type     day        hms     lat       lon         spd        dir       pre        qi
IR     2025250     91400   23.9200 -107.2900       7.8        56       219        73
IR     2025250     91400   23.8200 -107.4700       8.9        56       225        87
IR     2025250     91400   23.8200 -107.5000       9.2        55       225        87
IR     2025250     91400   23.8400 -107.6300      13.9        38       208        62
IR     2025250     91400   23.8000 -108.0000      13.8        64       198        80
IR     2025250     91400   23.8800 -108.0500       9.7        67       198        97
IR     2025250     91400   23.8800 -108.1300      11.5        71       197        99
IR     2025250     91400   23.8700 -108.3100      12.3        68       189        98
IR     2025250     91400   23.8700 -108.4200      11.4        65       183        99
IR     2025250     91400   23.8600 -108.5700       9.8        63       160        93
IR     2025250     91400   23.8600 -108.7300       8.7        61       161        78
IR     2025250     91400   23.8300 -108.7900       8.6        60       164        68
IR     2025250     91400   23.7800 -109.0100       8.9        51       173        89
IR     2025250     91400   23.7500 -109.1200      10.3        50       178        85
IR     2025250     91400   23.7500 -109.2000      11.9        48       181        77
IR     2025250     91400   23.7600 -109.4200      11.3        55       198        91
IR     2025250     91400   23.8000 -109.4300      11.3        54       197        88
IR     2025250     91400   23.7900 -109.6600       7.0        31       257        88
IR     2025250     91400   23.8100 -109.7100       7.1        24       261        93
IR     2025250     91400   23.7200 -109.9100       5.7       355       263        98
IR     2025250     91400   23.7200 -110.0100       5.3       358       223       100
IR     2025250     91400   23.7600 -110.0700       5.4        22       215        98
IR     2025250     91400   23.7700 -110.1900       5.7        48       211        92
IR     2025250     91400   23.7900 -110.3600       8.2        74       213        97
IR     2025250     91400   23.7600 -110.5000       7.9        71       210        99
IR     2025250     91400   23.7500 -110.6500       8.3        70       174        97
IR     2025250     91400   23.6800 -110.8200       7.1        58       176        99
IR     2025250     91400   23.6800 -110.9200       9.1        73       196        92
IR     2025250     91400   23.6700 -111.0700      11.2        79       185        90
IR     2025250     91400   23.6700 -111.0900      10.5        78       184        94
IR     2025250     91400   23.6600 -111.3200       7.1        47       201        87
IR     2025250     91400   23.6900 -111.8500       4.0        64       195        70
IR     2025250     91400   23.6400 -112.0300       5.8       104       205        92
IR     2025250     91400   23.6200 -112.3700       9.6       102       201        98
IR     2025250     91400   23.6800 -112.4800       8.8       126       167        64
IR     2025250     91400   23.7000 -112.5000       9.1       134       166        64
IR     2025250     91400   23.6100 -112.8300       6.8       142       173        75
IR     2025250     91400   23.6900 -112.9600       6.2       117       178        84
IR     2025250     91400   23.6600 -113.0800       6.8       117       202        98
IR     2025250     91400   23.6600 -113.1300       7.2       114       214       100
IR     2025250     91400   23.6300 -113.2600       9.3       106       263        98
IR     2025250     91400   23.6000 -113.4600       9.5       119       263        99
IR     2025250     91400   23.5800 -113.5600       8.0       134       223       100
IR     2025250     91400   23.5800 -113.6100       7.7       141       201        97
IR     2025250     91400   23.6600 -113.7000       7.3       150       184        95
IR     2025250     91400   23.5700 -113.9400       8.9       148       174       100
IR     2025250     91400   23.5600 -114.0100      10.1       151       176        95
IR     2025250     91400   23.5600 -114.1800       9.6       153       245        99
IR     2025250     91400   23.6400 -114.1800       9.2       156       214        96
IR     2025250     91400   23.6400 -114.3000       6.7       159       285        78
IR     2025250     91400   23.5400 -114.6500       7.3       109       383        69
IR     2025250     91400   23.6200 -114.7500      10.3       134       347        62
IR     2025250     91400   23.6000 -114.8700      10.8       149       315        91
IR     2025250     91400   23.5300 -115.0000      11.1       154       272        97
IR     2025250     91400   23.5700 -115.1100      10.0       152       271       100
IR     2025250     91400   23.5400 -115.1400       9.8       150       299       100
IR     2025250     91400   23.6000 -115.3100       8.4       115       411        79
IR     2025250     91400   23.6000 -115.3800       8.5       110       415        80
IR     2025250     91400   23.5900 -115.5200       9.9       120       402        99
IR     2025250     91400   23.5000 -115.7100      11.9       146       289        91
IR     2025250     91400   23.5000 -115.7800      12.1       147       287        92
IR     2025250     91400   23.5200 -115.9100      10.7       149       310        90
IR     2025250     91400   23.5700 -116.1300       9.4       130       361        96
IR     2025250     91400   23.5300 -116.6900      10.2       147       510        95
IR     2025250     91400   23.5500 -116.7700      10.0       135       537        86
IR     2025250     91400   23.5100 -116.8700      10.7       131       547        80
IR     2025250     91400   23.4500 -117.3400      10.4       172       358        84
IR     2025250     91400   23.4500 -117.4300      10.6       179       356        68
IR     2025250     91400   23.4700 -117.5000      10.2       175       356        77
IR     2025250     91400   23.5000 -117.6200       8.4       154       406        99
IR     2025250     91400   23.5100 -117.9600       6.2       153       403        99
IR     2025250     91400   23.7200 -107.3800       7.1        70       223        97
IR     2025250     91400   23.8000 -107.4800       8.6        57       225        89
IR     2025250     91400   23.7600 -107.5500       8.8        53       223        84
IR     2025250     91400   23.8000 -107.6400      13.6        39       214        64
IR     2025250     91400   23.7800 -108.0100      14.6        65       198        75
IR     2025250     91400   23.7800 -108.0600      14.1        66       198        81
IR     2025250     91400   23.6900 -108.2200      14.7        68       199        83
IR     2025250     91400   23.6800 -108.4300      11.4        69       198       100
IR     2025250     91400   23.6700 -108.5300       9.3        66       182        97
IR     2025250     91400   23.7500 -108.6400       8.2        65       160        73
IR     2025250     91400   23.7500 -108.6900       7.3        63       159        67
IR     2025250     91400   23.6600 -108.9500       6.7        60       166        75
IR     2025250     91400   23.6500 -109.0000       6.8        56       169        83
IR     2025250     91400   23.6400 -109.2000       7.2        52       180        96
IR     2025250     91400   23.6400 -109.3300       7.1        50       187        98
IR     2025250     91400   23.6800 -109.4000       8.6        50       206        96
IR     2025250     91400   23.6900 -109.5400       7.0        42       251        82
IR     2025250     91400   23.7100 -109.6900       5.6        29       275        67
IR     2025250     91400   23.6900 -110.0400       5.1       357       223        99
IR     2025250     91400   23.6700 -110.0800       4.9       357       218        99
IR     2025250     91400   23.6000 -110.2200       4.9        23       208        88
IR     2025250     91400   23.6200 -110.4200       6.9        70       208        91
IR     2025250     91400   23.6300 -110.5600       7.4        61       205        97
IR     2025250     91400   23.5900 -110.6000       6.7        60       204        99
IR     2025250     91400   23.6200 -110.8100       6.8        40       199        93
IR     2025250     91400   23.6400 -110.8300       7.0        48       192        98
IR     2025250     91400   23.6100 -111.0600      13.1        76       204        73
IR     2025250     91400   23.6500 -111.1500      10.7        72       198        82
IR     2025250     91400   23.6200 -111.3000       8.3        51       201        71
IR     2025250     91400   23.6400 -111.3200       7.3        47       201        83
IR     2025250     91400   23.5400 -111.8200       4.6        94       186        88
IR     2025250     91400   23.5400 -111.9400       5.7       105       196        97
IR     2025250     91400   23.5800 -112.0000       6.0       104       200        97
IR     2025250     91400   23.6000 -112.3800       9.5       102       201        98
IR     2025250     91400   23.6000 -112.4000       9.4       101       194        96
IR     2025250     91400   23.6000 -112.5700       7.0       111       158        63
IR     2025250     91400   23.5100 -112.7200       5.8       167       171        85
IR     2025250     91400   23.5500 -112.7800       6.2       149       173        71
IR     2025250     91400   23.5400 -113.0000       7.6       134       177        62
IR     2025250     91400   23.5500 -113.1100       7.9       126       206        86
IR     2025250     91400   23.4900 -113.2000       8.2       127       259        79
IR     2025250     91400   23.5500 -113.2800       8.2       113       286        99
IR     2025250     91400   23.5600 -113.4400       8.7       121       289       100
IR     2025250     91400   23.5200 -113.6000       7.2       139       204        99
IR     2025250     91400   23.5600 -113.6100       7.6       142       200        98
IR     2025250     91400   23.4600 -113.8200       7.7       156       186        60
IR     2025250     91400   23.4600 -113.8700       8.3       155       193        60
IR     2025250     91400   23.4600 -114.0900      11.2       161       253        98
IR     2025250     91400   23.5400 -114.1600      10.2       152       246       100
IR     2025250     91400   23.4500 -114.7900       9.8       122       357        64
IR     2025250     91400   23.4300 -114.9100      10.5       132       336        91
IR     2025250     91400   23.5100 -114.9900      11.0       152       278        96
IR     2025250     91400   23.5000 -115.0800       9.8       155       278        98
IR     2025250     91400   23.4800 -115.2300       8.2       140       419        78
IR     2025250     91400   23.4300 -115.4700       7.8       142       423        87
IR     2025250     91400   23.4500 -115.5100       8.7       141       419        74
IR     2025250     91400   23.4200 -115.6600      12.2       158       265        92
IR     2025250     91400   23.4000 -115.8000      12.8       161       241        98
IR     2025250     91400   23.3900 -115.8900      12.6       164       247        97
IR     2025250     91400   23.4700 -115.9900       9.3       143       368        73
IR     2025250     91400   23.3800 -116.1700      12.8       154       254       100
IR     2025250     91400   23.3800 -116.3100      12.0       166       239        79
IR     2025250     91400   23.4200 -116.3900      11.7       165       250        83
IR     2025250     91400   23.3700 -116.4700      11.9       171       252        81
IR     2025250     91400   23.3700 -116.6100      11.0       166       276        94
IR     2025250     91400   23.3700 -116.7200       9.7       155       299       100
IR     2025250     91400   23.3600 -116.7900       9.7       145       320        97
IR     2025250     91400   23.3800 -116.9500       9.9       153       556        60
IR     2025250     91400   23.3400 -117.5000       9.5       165       336        96
IR     2025250     91400   23.4000 -117.5300      10.2       175       324        77
IR     2025250     91400   23.3300 -117.9800       6.9       144       401        60
IR     2025250     91400   23.7000 -107.4100       7.4        74       223        96
IR     2025250     91400   23.6200 -108.1900      13.8        67       200        89
IR     2025250     91400   23.6500 -108.4600      10.6        70       198       100
IR     2025250     91400   23.6300 -108.6000       7.4        62       170        88
IR     2025250     91400   23.5600 -108.7200       5.3        53       168        60
IR     2025250     91400   23.6200 -108.8300       5.8        58       163        63
IR     2025250     91400   23.5900 -109.0700       4.5        46       174        88
IR     2025250     91400   23.5400 -109.2900       4.0        46       200        91
IR     2025250     91400   23.5700 -109.4300       5.4        43       232        93
IR     2025250     91400   23.5300 -109.8200       5.1         9       267        94
IR     2025250     91400   23.5500 -109.9100       5.5       356       269        99
IR     2025250     91400   23.5700 -110.0100       5.3       350       248        99
IR     2025250     91400   23.5800 -110.1800       5.0         8       209        97
IR     2025250     91400   23.5600 -110.2600       4.3        14       208        94
IR     2025250     91400   23.5800 -110.3500       4.9        58       208        96
IR     2025250     91400   23.5600 -110.6800       6.3        49       202        96
IR     2025250     91400   23.5500 -111.0300      11.8        67       210        69
IR     2025250     91400   23.5400 -111.1500      10.5        68       201        60
IR     2025250     91400   23.4400 -111.5700       4.0        49       197        62
IR     2025250     91400   23.4400 -111.8000       5.3       102       193        69
IR     2025250     91400   23.5100 -112.1400       7.2       130       233        98
IR     2025250     91400   23.4200 -112.2400       7.0       127       245        67
IR     2025250     91400   23.5000 -112.3400       8.5       111       198        60
IR     2025250     91400   23.4700 -113.2100       8.3       130       257        77
IR     2025250     91400   23.4200 -113.2900       7.6       130       288        94
IR     2025250     91400   23.4400 -113.3800       7.5       126       329        84
IR     2025250     91400   23.3900 -113.6100       7.4       123       238       100
IR     2025250     91400   23.4400 -113.8100       7.6       151       186        60
IR     2025250     91400   23.4400 -113.8500       8.1       153       200        67
IR     2025250     91400   23.3500 -114.0900      10.5       154       254        94
IR     2025250     91400   23.4300 -114.1600      10.9       159       274        96
IR     2025250     91400   23.3400 -114.4400      11.0       157       318        81
IR     2025250     91400   23.3300 -114.6100      10.4       140       349        70
IR     2025250     91400   23.3300 -114.6800      10.3       127       365        84
IR     2025250     91400   23.4100 -114.8700      10.5       123       346        94
IR     2025250     91400   23.4000 -114.9400      10.7       131       339        95
IR     2025250     91400   23.3400 -115.1000       8.3       139       407        85
IR     2025250     91400   23.3100 -115.2400       8.0       136       427        87
IR     2025250     91400   23.3300 -115.2900       7.8       140       431        76
IR     2025250     91400   23.3100 -115.3800       8.8       155       397        95
IR     2025250     91400   23.3000 -115.5900      13.2       168       208        99
IR     2025250     91400   23.3600 -115.6900      13.8       164       223       100
IR     2025250     91400   23.3800 -115.7100      13.4       164       228        99
IR     2025250     91400   23.2900 -115.9000      15.4       166       228        95
IR     2025250     91400   23.3700 -115.9400      12.7       164       250        98
IR     2025250     91400   23.2800 -116.1700      13.9       162       201       100
IR     2025250     91400   23.3000 -116.2100      13.5       164       225        97
IR     2025250     91400   23.3600 -116.2900      12.5       168       233        89
IR     2025250     91400   23.3500 -116.4800      12.0       175       250        76
IR     2025250     91400   23.3300 -116.5700      11.4       174       268        85
IR     2025250     91400   23.3500 -116.6600      10.3       163       285        98
IR     2025250     91400   23.3400 -116.8000       9.6       146       309       100
IR     2025250     91400   23.2800 -117.4500       9.8       154       396        68
IR     2025250     91400   23.2300 -117.7900       8.4       158       429        79
IR     2025250     91400   23.2200 -117.9800       6.6       159       442        85
IR     2025250     91400   23.2400 -117.9900       6.5       155       428        95
IR     2025250     91400   23.2100 -118.2000       5.3       136       419        60
IR     2025250     91400   23.5200 -108.0700      10.2        64       202        89
IR     2025250     91400   23.5200 -108.2300       9.3        68       202        99
IR     2025250     91400   23.4600 -108.5800       5.9        49       200        80
IR     2025250     91400   23.4700 -108.8000       4.3        20       178        65
IR     2025250     91400   23.4400 -108.9600       4.2         8       180        91
IR     2025250     91400   23.4500 -109.4200       4.2         1       253        76
IR     2025250     91400   23.4400 -109.6000       4.8         5       258        70
IR     2025250     91400   23.4800 -110.0100       6.1       332       265        60
IR     2025250     91400   23.3900 -110.3900       5.0        11       201        83
IR     2025250     91400   23.4000 -110.5300       5.2        61       202        89
IR     2025250     91400   23.3700 -110.6600       5.6        68       201        94
IR     2025250     91400   23.4300 -110.7700       5.2        32       202        62
IR     2025250     91400   23.3900 -111.7600       5.0        96       193        77
IR     2025250     91400   23.3200 -112.0000       6.1       120       197        67
IR     2025250     91400   23.3200 -112.0200       6.1       120       198        68
IR     2025250     91400   23.3900 -112.3400       6.5       113       209        83
IR     2025250     91400   23.3600 -112.5600       4.7        96       176        81
IR     2025250     91400   23.2800 -113.0400       8.8       144       209        68
IR     2025250     91400   23.2800 -113.1600       9.2       130       216        86
IR     2025250     91400   23.3500 -113.4000       7.3       132       327        85
IR     2025250     91400   23.3500 -113.5500       7.4       111       310        96
IR     2025250     91400   23.2500 -113.9500       8.7       149       218        93
IR     2025250     91400   23.2900 -114.0100       9.6       151       245        98
IR     2025250     91400   23.3300 -114.1200      10.4       156       258        97
IR     2025250     91400   23.2400 -114.2800      12.4       162       291        97
IR     2025250     91400   23.2800 -114.3900      12.1       163       289        99
IR     2025250     91400   23.2700 -114.5100      12.6       159       278        96
IR     2025250     91400   23.2500 -114.5600      12.9       157       268        97
IR     2025250     91400   23.2400 -114.7500      11.9       136       349        78
IR     2025250     91400   23.2600 -114.7900      11.3       128       360        81
IR     2025250     91400   23.2400 -114.9400      10.1       127       398        99
IR     2025250     91400   23.2900 -115.0900       8.2       133       407        87
IR     2025250     91400   23.2900 -115.2300       8.3       137       423        93
IR     2025250     91400   23.2000 -115.3600      11.3       158       243       100
IR     2025250     91400   23.2200 -115.4300      11.5       162       240        99
IR     2025250     91400   23.2600 -115.5300      12.5       167       209        97
IR     2025250     91400   23.2700 -115.8800      15.5       166       223        95
IR     2025250     91400   23.1800 -116.0100      13.6       158       223        99
IR     2025250     91400   23.2400 -116.0400      14.2       159       232        98
IR     2025250     91400   23.2600 -116.1500      13.8       161       200       100
IR     2025250     91400   23.1700 -116.3600       9.8       170       240        89
IR     2025250     91400   23.2500 -116.4500      11.2       176       252        75
IR     2025250     91400   23.1800 -116.5600       9.9       174       267        82
IR     2025250     91400   23.2400 -116.6800      10.1       164       294        98
IR     2025250     91400   23.2000 -116.7400       9.6       158       300       100
IR     2025250     91400   23.1500 -116.9100       9.1       140       308        84
IR     2025250     91400   23.2100 -117.6000       9.9       152       439        75
IR     2025250     91400   23.1900 -117.7400       8.6       156       434        85
IR     2025250     91400   23.1900 -118.2300       5.3       134       419        60
IR     2025250     91400   23.3700 -108.1400       8.4        82       202        63
IR     2025250     91400   23.4500 -108.3300       8.0        71       202        69
IR     2025250     91400   23.4000 -108.5200       5.5        53       202        62
IR     2025250     91400   23.4400 -108.5600       5.6        48       200        74
IR     2025250     91400   23.4300 -108.7400       4.9        17       187        61
IR     2025250     91400   23.3800 -108.9100       5.3       352       190        94
IR     2025250     91400   23.3800 -109.0400       4.9       346       185        98
IR     2025250     91400   23.3800 -109.0600       4.8       345       188        96
IR     2025250     91400   23.3800 -109.4600       4.2       354       257        68
IR     2025250     91400   23.3800 -110.0400       6.6       318       262        60
IR     2025250     91400   23.3700 -110.3700       5.5         6       200        78
IR     2025250     91400   23.3100 -110.7800       4.3        37       199        66
IR     2025250     91400   23.3000 -112.0800       5.7       114       201        73
IR     2025250     91400   23.2200 -112.9600       9.4       147       208        68
IR     2025250     91400   23.1800 -113.0900       9.7       131       216        80
IR     2025250     91400   23.2600 -113.1700       9.2       128       217        89
IR     2025250     91400   23.2100 -113.3200       7.7       135       240        90
IR     2025250     91400   23.2500 -113.3600       7.5       138       281        79
IR     2025250     91400   23.1800 -113.5400       6.8       116       271        99
IR     2025250     91400   23.1600 -113.6400       7.3       118       255        99
IR     2025250     91400   23.1500 -113.7400       7.8       118       244        97
IR     2025250     91400   23.2100 -113.8400       8.3       128       221        92
IR     2025250     91400   23.2300 -113.9600       8.6       144       213        87
IR     2025250     91400   23.1600 -114.1400      11.4       143       256        96
IR     2025250     91400   23.2200 -114.1700      11.0       155       260        98
IR     2025250     91400   23.1300 -114.4000      14.7       163       252        99
IR     2025250     91400   23.1500 -114.4200      14.3       164       255       100
IR     2025250     91400   23.1200 -114.5900      13.9       164       249        99
IR     2025250     91400   23.1300 -114.8700      12.2       142       301        94
IR     2025250     91400   23.1200 -115.2900      12.0       160       228       100
IR     2025250     91400   23.1400 -115.3100      12.0       158       228       100
IR     2025250     91400   23.1800 -115.4100      12.2       160       219       100
IR     2025250     91400   23.1700 -115.5500      13.0       166       198        99
IR     2025250     91400   23.1700 -115.6900      13.8       165       194        99
IR     2025250     91400   23.1000 -115.8700      12.9       154       223        97
IR     2025250     91400   23.1400 -115.9100      13.9       156       218        98
IR     2025250     91400   23.1400 -116.0000      13.2       153       225        98
IR     2025250     91400   23.1500 -116.3600       9.4       171       244        89
IR     2025250     91400   23.1000 -116.4600       8.6       176       260        84
IR     2025250     91400   23.1400 -116.6200       9.6       175       277        81
IR     2025250     91400   23.1400 -116.6600       9.1       168       290        92
IR     2025250     91400   23.1300 -116.8700       9.0       141       302        87
IR     2025250     91400   23.0900 -116.9000       8.3       142       300        78
IR     2025250     91400   23.0600 -117.2200      11.2       156       446        66
IR     2025250     91400   23.0800 -117.2600      11.1       155       450        67
IR     2025250     91400   23.0500 -117.3800      10.8       156       453        66
IR     2025250     91400   23.0200 -117.7500       9.8       155       437        98
IR     2025250     91400   23.1000 -117.8700       8.0       169       459        60
IR     2025250     91400   23.0000 -118.2400       7.8       153       381        85
IR     2025250     91400   23.0000 -118.2700       7.5       153       376        87
IR     2025250     91400   23.2700 -108.0200       9.0        89       201        71
IR     2025250     91400   23.3100 -108.1700       9.2        81       202        87
IR     2025250     91400   23.2600 -108.3100      10.5        78       200        93
IR     2025250     91400   23.2800 -108.3500      10.2        77       201        89
IR     2025250     91400   23.2500 -108.4700      10.7        68       187        76
IR     2025250     91400   23.3300 -108.5900       6.3        40       191        68
IR     2025250     91400   23.3200 -108.8000       5.8         0       187        77
IR     2025250     91400   23.2600 -108.9000       7.1       352       187        80
IR     2025250     91400   23.3100 -109.0600       5.7       343       186        96
IR     2025250     91400   23.2400 -109.2000       6.6       348       198        79
IR     2025250     91400   23.3000 -109.2900       4.9       347       220        91
IR     2025250     91400   23.2800 -109.3400       5.0       340       249        69
IR     2025250     91400   23.2500 -109.6800       4.9       313       270        60
IR     2025250     91400   23.2000 -109.8500       6.1       308       265        60
IR     2025250     91400   23.2600 -109.9300       6.0       308       264        60
IR     2025250     91400   23.2800 -109.9700       6.2       315       259        74
IR     2025250     91400   23.2100 -110.4400       6.3        32       200        84
IR     2025250     91400   23.2400 -110.4600       6.4        33       201        85
IR     2025250     91400   23.0800 -112.8300       7.4       127       230        84
IR     2025250     91400   23.1000 -112.9200       8.6       126       222        86
IR     2025250     91400   23.1600 -112.9800       9.5       135       214        77
IR     2025250     91400   23.1600 -113.0800      10.0       129       216        77
IR     2025250     91400   23.0900 -113.3100       9.1       114       240        95
IR     2025250     91400   23.1100 -113.3300       8.8       118       246        97
IR     2025250     91400   23.0800 -113.4800       7.7       122       270        96
IR     2025250     91400   23.1400 -113.6300       7.2       116       256       100
IR     2025250     91400   23.0800 -113.9500       9.7       118       223        98
IR     2025250     91400   23.0600 -114.0200      10.5       120       238        92
IR     2025250     91400   23.1200 -114.1200      11.5       136       244        98
IR     2025250     91400   23.0300 -114.3100      14.1       148       233        93
IR     2025250     91400   23.0300 -114.3800      14.5       156       228        95
IR     2025250     91400   23.1000 -114.5700      13.9       165       247        99
IR     2025250     91400   23.0800 -114.6500      13.8       161       246        99
IR     2025250     91400   23.0100 -114.9900      13.8       158       228        98
IR     2025250     91400   23.0000 -115.1100      13.2       163       190        99
IR     2025250     91400   23.0800 -115.3700      11.7       156       206        98
IR     2025250     91400   22.9800 -115.6000      10.1       132       214        68
IR     2025250     91400   22.9800 -115.6200      10.3       132       214        68
IR     2025250     91400   22.9800 -115.8300       9.8       134       229        80
IR     2025250     91400   23.0600 -115.8800      12.0       149       228        97
IR     2025250     91400   23.0500 -116.0200      11.6       141       229        82
IR     2025250     91400   23.0300 -116.0700      10.4       141       234        75
IR     2025250     91400   23.0400 -116.4800       7.9       162       265        97
IR     2025250     91400   23.0400 -116.5000       8.2       161       266        98
IR     2025250     91400   23.0300 -116.6200       9.1       159       277        88
IR     2025250     91400   23.0100 -116.7800       8.7       152       269        84
IR     2025250     91400   23.0200 -116.9100       8.3       142       300        79
IR     2025250     91400   23.0200 -116.9600       8.7       144       308        72
IR     2025250     91400   22.9800 -117.0800      10.9       147       442        84
IR     2025250     91400   22.9300 -117.2500      10.8       149       439        94
IR     2025250     91400   23.0100 -117.3900      10.5       157       442        70
IR     2025250     91400   23.0100 -117.4100      10.4       157       438        98
IR     2025250     91400   22.9400 -117.6300       7.9       149       347        99
IR     2025250     91400   22.9200 -117.6600       7.4       148       342        98
IR     2025250     91400   22.9500 -117.8300      10.0       160       332        96
IR     2025250     91400   22.9500 -117.9600      12.0       167       213        82
IR     2025250     91400   22.9100 -118.0900      11.3       171       322        96
IR     2025250     91400   22.9000 -118.1500      10.1       168       367        98
IR     2025250     91400   22.9400 -118.3000       7.9       156       369        86
IR     2025250     91400   22.9200 -118.3300       7.6       157       364        91
IR     2025250     91400   22.9800 -118.4300       6.9       142       369        82
IR     2025250     91400   23.1600 -108.1600      12.1        92       199        92
IR     2025250     91400   23.1800 -108.2900      12.4        85       194        96
IR     2025250     91400   23.2000 -108.3000      12.0        82       197        95
IR     2025250     91400   23.2300 -108.5000      11.1        68       181        71
IR     2025250     91400   23.1300 -108.7800       8.4        47       174        78
IR     2025250     91400   23.2100 -108.9100       7.7       357       184        68
IR     2025250     91400   23.2100 -108.9400       7.7       357       184        65
IR     2025250     91400   23.1400 -109.1400       6.6         5       177        62
IR     2025250     91400   23.2000 -109.2700       6.1       356       208        71
IR     2025250     91400   23.1500 -109.3800       5.4       359       247        78
IR     2025250     91400   23.1100 -109.5000       6.2         1       255        70
IR     2025250     91400   23.1100 -109.8700       6.2       305       251        98
IR     2025250     91400   23.1500 -109.9900       6.4       319       218        91
IR     2025250     91400   23.1400 -110.1900       7.8       339       199        74
IR     2025250     91400   23.1600 -110.2100       6.8       342       199        88
IR     2025250     91400   23.0900 -110.4000       6.3        38       201        79
IR     2025250     91400   23.0600 -110.5600       5.2        43       202        82
IR     2025250     91400   22.9800 -112.7400       4.6       132       230        94
IR     2025250     91400   23.0400 -112.8200       6.8       128       230        89
IR     2025250     91400   22.9700 -112.9300       7.0       129       246        96
IR     2025250     91400   22.9700 -113.0300       7.7       124       217        98
IR     2025250     91400   22.9800 -113.4500       7.9       137       256        88
IR     2025250     91400   23.0000 -113.4700       7.6       138       260        89
IR     2025250     91400   22.9500 -114.1200      13.4       112       289        68
IR     2025250     91400   22.9300 -114.2200      13.0       124       259        66
IR     2025250     91400   23.0000 -114.5500      13.2       163       240        99
IR     2025250     91400   22.9800 -114.6000      12.5       159       243        99
IR     2025250     91400   22.9900 -114.6900      12.6       159       245        99
IR     2025250     91400   22.9900 -114.8300      13.1       158       243        96
IR     2025250     91400   22.9400 -114.9600      13.4       157       215        96
IR     2025250     91400   22.9800 -115.0900      13.3       162       188        97
IR     2025250     91400   22.9100 -115.2700      10.9       158       200        95
IR     2025250     91400   22.9600 -115.6000      10.1       127       216        64
IR     2025250     91400   22.8800 -115.7600      10.2       116       264        85
IR     2025250     91400   22.9600 -115.8300       9.4       130       233        71
IR     2025250     91400   22.9500 -115.9500       9.7       127       253        70
IR     2025250     91400   22.8800 -116.1700       9.9       130       272        78
IR     2025250     91400   22.8600 -116.3600       9.5       135       317        90
IR     2025250     91400   22.9200 -116.4100       8.0       142       302        91
IR     2025250     91400   22.8700 -116.5800       9.7       148       373        99
IR     2025250     91400   22.8900 -116.6700      10.0       153       314        98
IR     2025250     91400   22.8400 -116.8400       8.1       146       213        93
IR     2025250     91400   22.8400 -116.8900       7.9       144       213        93
IR     2025250     91400   22.8900 -117.0800      10.4       141       446        70
IR     2025250     91400   22.8300 -117.1800      11.3       153       435        72
IR     2025250     91400   22.8300 -117.2700      10.1       150       342       100
IR     2025250     91400   22.8200 -117.3400       9.0       156       327        96
IR     2025250     91400   22.9000 -117.5300       7.2       153       326        96
IR     2025250     91400   22.8100 -117.6600       6.1       150       313        98
IR     2025250     91400   22.8300 -117.7700       7.9       150       333        95
IR     2025250     91400   22.8300 -117.7900       8.6       152       332        96
IR     2025250     91400   22.8100 -117.9300      11.5       162       208        94
IR     2025250     91400   22.8400 -118.0300      11.8       167       205        88
IR     2025250     91400   22.8400 -118.1400      10.4       164       342        99
IR     2025250     91400   22.8800 -118.2500       9.1       158       374        97
IR     2025250     91400   22.8600 -118.3400       7.3       154       358       100
IR     2025250     91400   22.7900 -118.5300       4.3       146       261        91
IR     2025250     91400   23.1200 -108.1800      13.2        95       198        82
IR     2025250     91400   23.0500 -108.3000      12.0        87       188        93
IR     2025250     91400   23.1300 -108.3300      13.4        89       188        89
IR     2025250     91400   23.1200 -108.5600      12.6        77       145        75
IR     2025250     91400   23.1200 -108.5800      12.3        78       148        77
IR     2025250     91400   23.0900 -108.7200      10.6        66       160        86
IR     2025250     91400   23.0900 -108.9500       7.0        22       170        81
IR     2025250     91400   23.1000 -109.0500       6.7        15       176        63
IR     2025250     91400   23.0400 -109.1200       5.8        18       175        72
IR     2025250     91400   23.0300 -109.3200       6.6        14       179        77
IR     2025250     91400   23.0200 -109.4700       8.0        20       226        68
IR     2025250     91400   23.0400 -109.4900       7.9        18       238        66
IR     2025250     91400   23.0400 -109.9900       7.3       329       199        86
IR     2025250     91400   23.0600 -110.1100       7.7       336       199        80
IR     2025250     91400   23.0500 -110.3400       6.2        27       201        72
IR     2025250     91400   23.0500 -110.4400       5.9        39       201        69
IR     2025250     91400   23.0000 -110.5800       4.2        29       202        86
IR     2025250     91400   22.9900 -111.9000       4.1       336       177        81
IR     2025250     91400   22.9400 -112.7500       4.6       128       233        97
IR     2025250     91400   22.9300 -112.9000       5.9       125       255        92
IR     2025250     91400   22.8800 -113.2200       8.2       122       244        96
IR     2025250     91400   22.9200 -113.3800       9.0       117       247        98
IR     2025250     91400   22.9400 -113.3900       8.7       122       248        96
IR     2025250     91400   22.9200 -113.7300       7.8       139       259        86
IR     2025250     91400   22.9000 -113.8800       9.4       106       404        79
IR     2025250     91400   22.9100 -114.0600      13.4       101       377        79
IR     2025250     91400   22.8900 -114.1800      12.8       113       303        86
IR     2025250     91400   22.9100 -114.2000      12.8       119       283        77
IR     2025250     91400   22.8200 -114.3600      11.4       123       247        81
IR     2025250     91400   22.9000 -114.5300      12.2       150       241       100
IR     2025250     91400   22.8000 -114.8600      12.8       151       209        93
IR     2025250     91400   22.8800 -114.9300      12.3       152       204        89
IR     2025250     91400   22.8600 -115.0300      11.9       153       188        85
IR     2025250     91400   22.8500 -115.1900      11.3       156       188        93
IR     2025250     91400   22.8100 -115.3400       9.9       155       225        98
IR     2025250     91400   22.8500 -115.3800       9.3       151       226        97
IR     2025250     91400   22.8600 -115.5100       9.7       122       259        87
IR     2025250     91400   22.8400 -115.6800      10.8       111       266        79
IR     2025250     91400   22.8500 -115.7400      10.6       114       267        83
IR     2025250     91400   22.8300 -115.8200       9.8       114       279        80
IR     2025250     91400   22.7600 -116.0200       9.8       123       333        95
IR     2025250     91400   22.7600 -116.0800       9.9       126       345        98
IR     2025250     91400   22.7800 -116.2400      10.8       139       324        93
IR     2025250     91400   22.8100 -116.3700      10.2       135       325        94
IR     2025250     91400   22.8100 -116.4400      10.0       141       331        99
IR     2025250     91400   22.8100 -116.5300       9.7       144       365       100
IR     2025250     91400   22.7600 -116.6800       9.6       145       400        98
IR     2025250     91400   22.8200 -116.8200       7.8       146       215        91
IR     2025250     91400   22.8200 -116.8900       7.7       142       215        88
IR     2025250     91400   22.8100 -117.0300       9.4       135       442        73
IR     2025250     91400   22.8100 -117.1600      10.9       140       436        92
IR     2025250     91400   22.7400 -117.2400      10.6       142       343        98
IR     2025250     91400   22.7200 -117.3400       9.6       150       319        98
IR     2025250     91400   22.7200 -117.4800       8.2       149       267        97
IR     2025250     91400   22.7900 -117.6200       5.8       152       294        99
IR     2025250     91400   22.7100 -117.7000       8.2       146       312       100
IR     2025250     91400   22.7100 -117.8100       9.1       148       331        97
IR     2025250     91400   22.7400 -117.9200      11.1       157       312        98
IR     2025250     91400   22.7600 -118.0000      11.3       160       205        97
IR     2025250     91400   22.7000 -118.1100       9.6       150       204        98
IR     2025250     91400   22.7500 -118.2900       7.3       146       333        88
IR     2025250     91400   22.7300 -118.3900       6.2       144       325        93
IR     2025250     91400   22.7700 -118.5100       4.5       147       261        92
IR     2025250     91400   23.0400 -108.0500      12.1        97       197        61
IR     2025250     91400   23.0300 -108.2300      12.1        90       197        96
IR     2025250     91400   22.9800 -108.3500      10.6        89       189        89
IR     2025250     91400   22.9400 -108.4100      10.4        94       182        90
IR     2025250     91400   22.9300 -108.6400       9.2        84       158        93
IR     2025250     91400   22.9300 -108.6700       9.5        85       159        97
IR     2025250     91400   22.9600 -108.8400       7.4        70       164        87
IR     2025250     91400   22.9800 -108.9600       5.2        41       166        89
IR     2025250     91400   22.9900 -109.1300       5.1        10       175        65
IR     2025250     91400   22.9000 -109.2800       5.0       331       179        83
IR     2025250     91400   22.9000 -109.3900       6.1       348       203        60
IR     2025250     91400   22.9500 -109.6700      10.1        24       205        76
IR     2025250     91400   22.9000 -109.8100       9.8        14       199        67
IR     2025250     91400   22.8800 -109.9400       5.6       324       198        83
IR     2025250     91400   22.8900 -110.1600       8.3        66       200        72
IR     2025250     91400   22.9100 -110.1800       7.1        55       199        95
IR     2025250     91400   22.8300 -112.8800       4.2       136       216        93
IR     2025250     91400   22.8500 -112.9700       4.5       134       217        92
IR     2025250     91400   22.8000 -113.1900       7.7       117       261        98
IR     2025250     91400   22.8400 -113.2100       8.0       119       254        98
IR     2025250     91400   22.8300 -113.3300       9.0       114       261       100
IR     2025250     91400   22.7400 -113.7300       9.6       123       408        87
IR     2025250     91400   22.7300 -113.8900       8.1       117       416        89
IR     2025250     91400   22.7300 -113.9200       8.0       115       417        85
IR     2025250     91400   22.8100 -114.1100      11.2       103       408        89
IR     2025250     91400   22.7400 -114.2400       9.7       108       391        98
IR     2025250     91400   22.8000 -114.3500      11.2       122       257        95
IR     2025250     91400   22.8000 -114.3700      11.2       124       255        96
IR     2025250     91400   22.7300 -114.5500      12.7       140       274        95
IR     2025250     91400   22.7300 -114.6400      13.1       146       250        93
IR     2025250     91400   22.7600 -114.8200      12.5       153       214        92
IR     2025250     91400   22.7800 -114.8600      12.8       152       207        87
IR     2025250     91400   22.7100 -115.0200      12.0       152       191        93
IR     2025250     91400   22.7300 -115.1300      12.0       155       189        97
IR     2025250     91400   22.7500 -115.2900      10.7       156       195        96
IR     2025250     91400   22.6800 -115.3700      11.6       152       256       100
IR     2025250     91400   22.7600 -115.4200      10.2       147       261        97
IR     2025250     91400   22.7100 -115.6400      11.8       122       300        99
IR     2025250     91400   22.7100 -115.6600      12.0       119       299        99
IR     2025250     91400   22.7100 -115.7800      11.7       113       303        97
IR     2025250     91400   22.7000 -115.9800       9.7       124       377        99
IR     2025250     91400   22.7400 -116.0700       9.7       127       378        99
IR     2025250     91400   22.7400 -116.1100      10.0       129       345       100
IR     2025250     91400   22.7100 -116.2800      11.1       142       329        99
IR     2025250     91400   22.6700 -116.3600      10.9       148       328       100
IR     2025250     91400   22.6400 -116.5000      10.7       154       364       100
IR     2025250     91400   22.6600 -116.6300      10.1       145       400       100
IR     2025250     91400   22.6800 -116.7200       9.0       151       406        97
IR     2025250     91400   22.7000 -117.4800       8.5       148       264        98
IR     2025250     91400   22.6500 -117.6000       8.9       151       265        98
IR     2025250     91400   22.6700 -117.7300       9.5       147       317        99
IR     2025250     91400   22.6400 -117.8500      10.4       149       312       100
IR     2025250     91400   22.6800 -118.0900       9.4       151       202        97
IR     2025250     91400   22.6700 -118.2400       7.3       140       217        69
IR     2025250     91400   22.6700 -118.3300       7.4       140       260        62
IR     2025250     91400   22.6700 -118.4500       6.6       154       217        67
IR     2025250     91400   22.6600 -118.6000       6.1       161       239        73
IR     2025250     91400   22.9400 -107.9300      11.1        98       182        82
IR     2025250     91400   22.8600 -108.3400       9.0        92       198        90
IR     2025250     91400   22.8300 -108.4500       9.7        88       196        86
IR     2025250     91400   22.9100 -108.5000       9.5        90       167        77
IR     2025250     91400   22.8400 -108.7000       8.9        85       167        97
IR     2025250     91400   22.8200 -108.8300       6.0        76       169        91
IR     2025250     91400   22.8000 -109.2400       6.4       325       199        84
IR     2025250     91400   22.7900 -109.3900       7.2       353       206        68
IR     2025250     91400   22.8500 -109.5000       9.4        21       204        62
IR     2025250     91400   22.8700 -109.5200      10.1        23       205        60
IR     2025250     91400   22.7800 -109.7700       8.4        27       199        98
IR     2025250     91400   22.7800 -109.8700       6.8        14       199        66
IR     2025250     91400   22.8000 -110.3900       8.8        84       200        82
IR     2025250     91400   22.8200 -110.4100       8.4        83       200        74
IR     2025250     91400   22.6700 -113.1800       7.4       102       303        87
IR     2025250     91400   22.7300 -113.2600       9.1       108       313        93
IR     2025250     91400   22.7300 -113.3800      10.0       103       324        98
IR     2025250     91400   22.7000 -113.4800      10.3       104       322       100
IR     2025250     91400   22.6600 -113.5800      10.0       111       302        95
IR     2025250     91400   22.6300 -113.7800       9.1       123       254        86
IR     2025250     91400   22.6700 -113.8600       8.3       122       411        99
IR     2025250     91400   22.6500 -113.9400       7.6       119       416        94
IR     2025250     91400   22.6200 -114.1600       6.6       108       425        95
IR     2025250     91400   22.6100 -114.2500       7.4       109       421        98
IR     2025250     91400   22.6700 -114.3100       8.6       115       384        99
IR     2025250     91400   22.6300 -114.5000      10.5       140       285        98
IR     2025250     91400   22.6700 -114.5400      11.7       140       279        96
IR     2025250     91400   22.6800 -114.6500      12.5       147       250        89
IR     2025250     91400   22.5900 -115.0700      12.2       158       196        99
IR     2025250     91400   22.5900 -115.0900      12.2       158       194        99
IR     2025250     91400   22.6000 -115.2700      11.3       158       214        99
IR     2025250     91400   22.6400 -115.3600      11.5       149       258        99
IR     2025250     91400   22.6100 -115.4800      11.5       141       323        97
IR     2025250     91400   22.6100 -115.5700      11.3       128       357        95
IR     2025250     91400   22.6000 -115.8700      10.0       124       375        97
IR     2025250     91400   22.5800 -115.9900       8.5       135       663        88
IR     2025250     91400   22.5500 -116.0200       8.8       139       664        93
IR     2025250     91400   22.5900 -116.1500       9.4       140       664        84
IR     2025250     91400   22.5900 -116.2800      10.7       151       623        71
IR     2025250     91400   22.6300 -116.3900      10.8       155       334        97
IR     2025250     91400   22.5400 -116.5200      11.7       156       329        99
IR     2025250     91400   22.6200 -116.6600       9.8       147       400       100
IR     2025250     91400   22.6000 -116.6900       9.6       149       393       100
IR     2025250     91400   22.5300 -116.8400       6.7       155       317        79
IR     2025250     91400   22.5900 -117.0100       4.8       124       318        67
IR     2025250     91400   22.6000 -117.0500       6.6       129       321        69
IR     2025250     91400   22.5800 -117.2300      10.2       153       320        96
IR     2025250     91400   22.5700 -117.3500      10.5       156       243        99
IR     2025250     91400   22.6000 -117.3700      10.3       157       243       100
IR     2025250     91400   22.5500 -117.5800       9.7       153       244       100
IR     2025250     91400   22.5500 -117.6000       9.7       152       254       100
IR     2025250     91400   22.5400 -117.8000      10.0       151       311       100
IR     2025250     91400   22.5500 -118.0900       9.8       150       249        99
IR     2025250     91400   22.5100 -118.2100       8.1       151       340       100
IR     2025250     91400   22.5000 -118.3500       9.1       149       217        95
IR     2025250     91400   22.4800 -118.3700       9.2       154       217        90
IR     2025250     91400   22.5400 -118.5200       9.4       151       213        87
IR     2025250     91400   22.8100 -108.3800       8.3        77       199        67
IR     2025250     91400   22.8100 -108.4800       8.8        80       197        63
IR     2025250     91400   22.7500 -108.8500       6.0        76       172        93
IR     2025250     91400   22.7100 -108.9400       4.1        60       178        90
IR     2025250     91400   22.6900 -109.3700       6.8       344       207        82
IR     2025250     91400   22.6900 -109.4000       6.8       349       207        78
IR     2025250     91400   22.7600 -109.8000       6.9        20       199        85
IR     2025250     91400   22.7600 -109.8500       6.3        12       199        70
IR     2025250     91400   22.5800 -112.2000       4.0       251       179        94
IR     2025250     91400   22.5700 -113.2000       7.4       103       350        98
IR     2025250     91400   22.5800 -113.3700       8.8       108       359        89
IR     2025250     91400   22.5400 -113.4700       9.1       111       280        98
IR     2025250     91400   22.6000 -113.5700       9.6       109       284        95
IR     2025250     91400   22.5900 -113.6900      10.1       108       244        92
IR     2025250     91400   22.6100 -113.7600       9.4       120       248        88
IR     2025250     91400   22.5400 -113.9200       6.6       126       394        91
IR     2025250     91400   22.5600 -114.1000       5.1       123       428        84
IR     2025250     91400   22.5700 -114.1900       6.2       114       428        95
IR     2025250     91400   22.5500 -114.2900       6.6       130       412        94
IR     2025250     91400   22.5000 -114.4600       8.5       153       288        99
IR     2025250     91400   22.5200 -114.4800       8.9       153       287       100
IR     2025250     91400   22.4900 -114.9100       9.8       157       222       100
IR     2025250     91400   22.4900 -114.9300      10.1       158       220        99
IR     2025250     91400   22.4800 -115.1400      13.3       163       213        99
IR     2025250     91400   22.4800 -115.2100      13.5       164       220       100
IR     2025250     91400   22.5300 -115.3600      11.9       149       272        99
IR     2025250     91400   22.5600 -115.3800      11.9       146       280        98
IR     2025250     91400   22.5500 -115.5400      12.3       134       377        96
IR     2025250     91400   22.4600 -115.7200      13.0       123       549        95
IR     2025250     91400   22.4800 -115.7400      12.8       125       568        97
IR     2025250     91400   22.5000 -115.8700      10.4       127       375       100
IR     2025250     91400   22.5100 -116.0000       8.9       145       663       100
IR     2025250     91400   22.4900 -116.1000       8.8       148       663        98
IR     2025250     91400   22.5100 -116.2100       9.1       141       677        94
IR     2025250     91400   22.4500 -116.5600      11.1       157       320        97
IR     2025250     91400   22.4700 -116.6700      10.8       157       322        98
IR     2025250     91400   22.4300 -116.8200       8.9       157       311        94
IR     2025250     91400   22.4200 -116.8900       7.5       156       310        95
IR     2025250     91400   22.4600 -117.0100       5.1       148       317        95
IR     2025250     91400   22.4600 -117.1700       8.2       147       318        97
IR     2025250     91400   22.4500 -117.2400       9.3       153       316        97
IR     2025250     91400   22.4700 -117.3000       9.6       153       263        97
IR     2025250     91400   22.4900 -117.4600      10.1       157       213       100
IR     2025250     91400   22.4200 -117.6300       9.3       151       239       100
IR     2025250     91400   22.4400 -117.6400       9.7       150       249        98
IR     2025250     91400   22.4400 -117.8500      10.0       149       327        99
IR     2025250     91400   22.4100 -117.9000      10.3       151       332       100
IR     2025250     91400   22.3900 -118.0300       8.3       162       314        99
IR     2025250     91400   22.3800 -118.1900       6.7       168       311       100
IR     2025250     91400   22.3800 -118.3000       7.3       161       306       100
IR     2025250     91400   22.3800 -118.3300       7.7       160       300       100
IR     2025250     91400   22.4600 -118.4600       9.8       158       214        88
IR     2025250     91400   22.4300 -118.5800      13.1       155       208        93
IR     2025250     91400   22.7100 -108.3300       7.1        77       201        66
IR     2025250     91400   22.6100 -108.8500       7.3        68       206        95
IR     2025250     91400   22.5900 -109.2800       5.9       342       208        75
IR     2025250     91400   22.5900 -109.3600       5.9       355       208        75
IR     2025250     91400   22.6300 -109.4200       5.7       359       207        78
IR     2025250     91400   22.5700 -109.7900       5.2         8       202        88
IR     2025250     91400   22.5900 -109.9000       5.9       345       200        92
IR     2025250     91400   22.6100 -109.9200       5.6       347       199        86
IR     2025250     91400   22.5800 -111.0400       4.1       208       131        67
IR     2025250     91400   22.5400 -111.1500       4.7       216       142        60
IR     2025250     91400   22.5100 -111.3800       6.2       203       152        73
IR     2025250     91400   22.5300 -111.4200       4.2       176       152        70
IR     2025250     91400   22.4400 -113.1900       8.2        97       232        94
IR     2025250     91400   22.4400 -113.3100       7.7       111       270        97
IR     2025250     91400   22.4400 -113.3600       7.6       113       273        97
IR     2025250     91400   22.4700 -113.5100       8.8       114       263        94
IR     2025250     91400   22.5100 -113.6400       9.7       107       245        94
IR     2025250     91400   22.4400 -113.7800       7.7       111       243        87
IR     2025250     91400   22.4600 -113.8200       6.9       122       244        87
IR     2025250     91400   22.5000 -113.9000       6.1       129       260        90
IR     2025250     91400   22.4300 -114.0800       5.2       139       441        70
IR     2025250     91400   22.4500 -114.1500       5.7       138       430        85
IR     2025250     91400   22.4900 -114.3000       6.6       142       367        99
IR     2025250     91400   22.4800 -114.4700       8.0       154       287        98
IR     2025250     91400   22.4800 -114.4900       7.7       155       286        98
IR     2025250     91400   22.4500 -114.8900       9.8       157       231       100
IR     2025250     91400   22.4000 -115.0400      12.0       162       224        98
IR     2025250     91400   22.4600 -115.1200      13.4       162       215        99
IR     2025250     91400   22.3700 -115.2600      12.4       157       259        99
IR     2025250     91400   22.3900 -115.3000      12.4       157       263        99
IR     2025250     91400   22.3900 -115.4400      11.2       141       401        96
IR     2025250     91400   22.4300 -116.0200       9.1       145       377       100
IR     2025250     91400   22.4300 -116.0500       9.0       147       376       100
IR     2025250     91400   22.4300 -116.1600       9.0       153       312        97
IR     2025250     91400   22.3400 -116.3200      10.9       159       312        85
IR     2025250     91400   22.3500 -116.4500      11.0       156       312       100
IR     2025250     91400   22.3700 -116.5800      10.2       155       317        92
IR     2025250     91400   22.3500 -116.6500      10.0       148       316        92
IR     2025250     91400   22.4100 -116.8000       9.0       157       310        94
IR     2025250     91400   22.3800 -116.8500       8.5       154       309        91
IR     2025250     91400   22.3200 -117.0400       6.7       155       370        99
IR     2025250     91400   22.3700 -117.1400       7.6       154       323        94
IR     2025250     91400   22.3700 -117.2800       8.7       159       260        99
IR     2025250     91400   22.3100 -117.3100       9.2       151       231       100
IR     2025250     91400   22.3000 -117.5200       8.7       149       220        97
IR     2025250     91400   22.3000 -117.6300       9.2       149       258       100
IR     2025250     91400   22.3200 -117.6900       9.4       155       267       100
IR     2025250     91400   22.3300 -117.9800      10.0       168       325       100
IR     2025250     91400   22.3000 -118.1600       8.1       173       313       100
IR     2025250     91400   22.3200 -118.2700       6.6       167       297        97
IR     2025250     91400   22.3200 -118.2900       6.7       164       292        97
IR     2025250     91400   22.2900 -118.4100       7.2       163       201        99
IR     2025250     91400   22.2700 -118.5700       7.2       154       194        89
IR     2025250     91400   22.5600 -108.4300       5.8        50       220        61
IR     2025250     91400   22.5800 -108.4800       6.7        50       209        63
IR     2025250     91400   22.5800 -108.8800       6.2        63       204        97
IR     2025250     91400   22.5300 -109.2500       5.0       337       208        83
IR     2025250     91400   22.5700 -109.3400       5.6       353       208        70
IR     2025250     91400   22.5500 -109.7900       5.1         2       202        98
IR     2025250     91400   22.5200 -109.9200       6.4       339       201        98
IR     2025250     91400   22.5400 -110.0200       4.3       347       198        96
IR     2025250     91400   22.4400 -110.4900       6.9        62       196        64
IR     2025250     91400   22.4000 -111.4000       9.7       226       158        76
IR     2025250     91400   22.4000 -111.5300       5.9       185       160        65
IR     2025250     91400   22.4000 -113.1500       7.1        96       218        95
IR     2025250     91400   22.3400 -113.2900       6.9       104       238        89
IR     2025250     91400   22.4200 -113.3400       7.6       111       266        98
IR     2025250     91400   22.3700 -113.5400       7.1       113       264        94
IR     2025250     91400   22.3600 -113.6600       6.9       107       265        93
IR     2025250     91400   22.3800 -113.6700       7.2       105       258        89
IR     2025250     91400   22.3600 -113.8000       5.4       110       401        83
IR     2025250     91400   22.4000 -113.9100       5.0       119       440        73
IR     2025250     91400   22.3900 -114.0200       4.9       133       442        70
IR     2025250     91400   22.3900 -114.2400       7.0       146       423        93
IR     2025250     91400   22.3600 -114.2600       7.9       152       402        96
IR     2025250     91400   22.3800 -114.3800       8.1       150       297       100
IR     2025250     91400   22.3800 -114.4900       8.4       150       287        98
IR     2025250     91400   22.2900 -114.6300       9.4       147       284        98
IR     2025250     91400   22.2800 -114.8200      10.0       156       272        99
IR     2025250     91400   22.3400 -115.0800      11.8       161       247        99
IR     2025250     91400   22.3500 -115.2400      12.5       159       263       100
IR     2025250     91400   22.3100 -115.3900      12.4       153       361        84
IR     2025250     91400   22.3100 -115.4100      12.1       151       363        84
IR     2025250     91400   22.2800 -115.6200      12.9       139       435        98
IR     2025250     91400   22.2600 -115.6700      12.2       138       430       100
IR     2025250     91400   22.3100 -115.8400      10.6       133       380        97
IR     2025250     91400   22.2900 -115.9400       9.6       139       378        96
IR     2025250     91400   22.3300 -116.0700       9.1       149       391       100
IR     2025250     91400   22.3000 -116.1200       9.4       152       393        98
IR     2025250     91400   22.2900 -116.4200      10.4       156       314        93
IR     2025250     91400   22.2500 -116.6300      10.1       149       321        94
IR     2025250     91400   22.2400 -116.7400      10.3       144       318       100
IR     2025250     91400   22.2400 -116.8100      10.2       146       315       100
IR     2025250     91400   22.2400 -116.9500       7.7       149       350        92
IR     2025250     91400   22.2100 -117.0400       6.2       153       404        74
IR     2025250     91400   22.2700 -117.1200       6.6       150       396        89
IR     2025250     91400   22.2900 -117.3000       8.8       151       270        99
IR     2025250     91400   22.2000 -117.4300       9.6       140       270        97
IR     2025250     91400   22.2000 -117.4900       9.3       144       268        96
IR     2025250     91400   22.2600 -117.6200       9.2       147       263       100
IR     2025250     91400   22.2800 -117.6600       9.4       152       266        99
IR     2025250     91400   22.1900 -117.8100      10.4       155       312        99
IR     2025250     91400   22.2500 -117.8800      11.3       163       311        99
IR     2025250     91400   22.2000 -118.0300       9.5       174       313        91
IR     2025250     91400   22.2000 -118.1600       7.8       174       312        96
IR     2025250     91400   22.2000 -118.2700       6.6       170       204        94
IR     2025250     91400   22.2500 -118.4200       6.9       165       196        99
IR     2025250     91400   22.1700 -118.5400       6.2       158       189        83
IR     2025250     91400   22.1700 -118.5700       6.1       158       190        79
IR     2025250     91400   22.4800 -108.4600       6.0        56       381        80
IR     2025250     91400   22.4700 -108.5600       6.7        46       357        92
IR     2025250     91400   22.4700 -108.7100       6.9        44       209        98
IR     2025250     91400   22.4600 -108.7900       5.2        36       209        99
IR     2025250     91400   22.4700 -109.1200       5.5       286       209        99
IR     2025250     91400   22.3600 -109.7500       5.2       343       181        98
IR     2025250     91400   22.3800 -109.7700       5.4       340       184        99
IR     2025250     91400   22.4200 -109.8800       7.6       332       189        96
IR     2025250     91400   22.4300 -110.1000       5.8       338       197        99
IR     2025250     91400   22.3700 -110.1400       5.3       326       197        97
IR     2025250     91400   22.3800 -110.3400       5.8        61       195        81
IR     2025250     91400   22.4200 -110.4700       7.5        55       195        76
IR     2025250     91400   22.3300 -110.6200       8.2        38       183        66
IR     2025250     91400   22.3300 -110.6500       8.2        33       174        66
IR     2025250     91400   22.3100 -111.0600       5.5       334       169        99
IR     2025250     91400   22.3600 -111.3400      10.5       241       161        97
IR     2025250     91400   22.3800 -111.3900      10.9       234       159        91
IR     2025250     91400   22.3800 -111.5100       7.0       190       160        69
IR     2025250     91400   22.3000 -113.2000       7.1       104       226       100
IR     2025250     91400   22.2300 -113.4100       5.5        96       263        86
IR     2025250     91400   22.2500 -113.4500       6.2        96       274        90
IR     2025250     91400   22.2400 -113.5700       6.9        96       352        91
IR     2025250     91400   22.2600 -113.7300       6.7       104       433        92
IR     2025250     91400   22.3000 -113.8600       5.7       114       457        78
IR     2025250     91400   22.2700 -113.9100       6.5       115       479        85
IR     2025250     91400   22.2500 -114.1100       8.6       126       494        81
IR     2025250     91400   22.2000 -114.2600      10.1       124       506        92
IR     2025250     91400   22.2000 -114.9800      10.1       153       270       100
IR     2025250     91400   22.1900 -115.0200      10.4       151       271       100
IR     2025250     91400   22.2500 -115.2200      12.1       152       275        94
IR     2025250     91400   22.2500 -115.2400      12.1       151       286        94
IR     2025250     91400   22.1800 -115.3700      12.0       149       360        81
IR     2025250     91400   22.2000 -115.5500      11.7       147       370        99
IR     2025250     91400   22.2400 -115.6600      12.4       140       426       100
IR     2025250     91400   22.1700 -115.7400      12.0       136       370        98
IR     2025250     91400   22.1900 -115.9200      11.0       141       355        99
IR     2025250     91400   22.1800 -115.9400      10.9       144       359        99
IR     2025250     91400   22.1600 -116.0600      10.9       154       378       100
IR     2025250     91400   22.2000 -116.2600      11.2       155       332        96
IR     2025250     91400   22.1900 -116.3200      11.0       155       322        93
IR     2025250     91400   22.1700 -116.4900      10.1       151       319       100
IR     2025250     91400   22.1900 -116.5300      10.2       150       322       100
IR     2025250     91400   22.1200 -116.7000      10.5       148       339       100
IR     2025250     91400   22.1400 -116.7700      10.4       144       339        99
IR     2025250     91400   22.1600 -116.8700       9.7       149       366       100
IR     2025250     91400   22.1900 -117.0500       6.4       152       401        70
IR     2025250     91400   22.1900 -117.0700       6.3       154       400        68
IR     2025250     91400   22.1900 -117.2000       7.2       145       386        76
IR     2025250     91400   22.0900 -117.5100      10.3       144       323       100
IR     2025250     91400   22.1100 -117.6700       9.5       147       329       100
IR     2025250     91400   22.1700 -117.7900      10.2       155       316        97
IR     2025250     91400   22.0800 -117.8500       9.2       153       317       100
IR     2025250     91400   22.1400 -117.9500      10.5       168       316        96
IR     2025250     91400   22.1200 -118.1300       7.9       174       314        88
IR     2025250     91400   22.1600 -118.1900       7.2       173       303        92
IR     2025250     91400   22.0700 -118.3000       6.5       164       191        96
IR     2025250     91400   22.1500 -118.4800       6.3       159       183        90
IR     2025250     91400   22.1200 -118.5700       5.8       157       185        69
IR     2025250     91400   22.3300 -107.8600      13.4        75       170       100
IR     2025250     91400   22.3300 -107.9700      11.1        77       183       100
IR     2025250     91400   22.3800 -108.1500       5.1        81       185        67
IR     2025250     91400   22.3900 -108.4100       5.0        67       388        88
IR     2025250     91400   22.3500 -108.4400       5.2        67       386        98
IR     2025250     91400   22.3700 -108.5900       5.8        46       363        98
IR     2025250     91400   22.3800 -108.6900       5.7        38       248        99
IR     2025250     91400   22.3100 -108.9400       5.6       295       208        99
IR     2025250     91400   22.3400 -109.7000       4.5       356       180        93
IR     2025250     91400   22.2500 -109.9500       5.8       308       179        96
IR     2025250     91400   22.3100 -110.5000       8.2        50       196        83
IR     2025250     91400   22.3100 -110.6300       8.5        36       183        67
IR     2025250     91400   22.2700 -110.6600       9.2        24       186        83
IR     2025250     91400   22.2100 -110.9000      10.3       351       159        70
IR     2025250     91400   22.2100 -111.0200       8.1       352       191        87
IR     2025250     91400   22.2700 -111.0300       7.8       351       175        96
IR     2025250     91400   22.2000 -111.1900       4.2       323       193        70
IR     2025250     91400   22.1900 -111.5100       4.1       135       180        82
IR     2025250     91400   22.2500 -111.6200       4.4       132       177        68
IR     2025250     91400   22.1500 -112.5800       4.3        96       223        98
IR     2025250     91400   22.1400 -113.0500       6.0       107       215        99
IR     2025250     91400   22.1600 -113.1000       6.4       109       215        99
IR     2025250     91400   22.1300 -113.2900       4.3       116       231        79
IR     2025250     91400   22.1900 -113.3900       4.7        97       248        79
IR     2025250     91400   22.2100 -113.4100       5.2        95       262        83
IR     2025250     91400   22.2000 -113.5300       6.6        91       352        84
IR     2025250     91400   22.1100 -113.7200       7.8        94       421        99
IR     2025250     91400   22.1100 -113.8800       8.0       104       419       100
IR     2025250     91400   22.1100 -113.9100       8.3       105       415       100
IR     2025250     91400   22.1400 -114.0100       9.1       118       367        90
IR     2025250     91400   22.1400 -114.2500      11.6       120       515        97
IR     2025250     91400   22.0900 -114.4200      12.6       114       541        99
IR     2025250     91400   22.1700 -114.5700      10.9       138       290        88
IR     2025250     91400   22.0800 -114.6800      11.4       129       353        93
IR     2025250     91400   22.1100 -115.0200       9.7       148       296        97
IR     2025250     91400   22.1300 -115.0400       9.8       148       285        99
IR     2025250     91400   22.1500 -115.1700      10.6       147       287        88
IR     2025250     91400   22.0800 -115.2800      10.9       141       330        79
IR     2025250     91400   22.1000 -115.4600      12.5       147       361        85
IR     2025250     91400   22.1300 -115.5900      12.5       145       366        96
IR     2025250     91400   22.1100 -115.7100      12.6       140       362        98
IR     2025250     91400   22.0700 -115.7800      11.0       143       360        98
IR     2025250     91400   22.0800 -115.8700      10.4       141       363       100
IR     2025250     91400   22.0400 -115.9700      11.1       155       350       100
IR     2025250     91400   22.0700 -116.1700      13.3       158       368        95
IR     2025250     91400   22.0900 -116.1900      13.0       157       370        95
IR     2025250     91400   22.0300 -116.4100      11.8       154       313        99
IR     2025250     91400   22.0200 -116.4500      11.6       153       302        99
IR     2025250     91400   22.0200 -116.6300      11.3       151       321        99
IR     2025250     91400   22.0200 -116.7200      11.2       151       388       100
IR     2025250     91400   22.0500 -116.8500      11.4       152       376        99
IR     2025250     91400   22.0100 -116.9000      11.4       154       391       100
IR     2025250     91400   22.0900 -117.0000       9.4       149       392        86
IR     2025250     91400   22.0900 -117.0900       8.6       149       392        78
IR     2025250     91400   22.0400 -117.3000      10.0       144       359        98
IR     2025250     91400   21.9900 -117.4200      10.4       153       325        98
IR     2025250     91400   21.9900 -117.4500      10.5       153       320        99
IR     2025250     91400   21.9900 -117.5800       9.6       153       316        95
IR     2025250     91400   22.0600 -117.8600       8.7       150       314        99
IR     2025250     91400   22.0000 -118.0000       7.2       156       310        97
IR     2025250     91400   22.0300 -118.1700       7.1       167       314        97
IR     2025250     91400   21.9900 -118.2200       5.7       163       308        97
IR     2025250     91400   22.0500 -118.3000       6.2       164       197        97
IR     2025250     91400   22.0500 -118.4800       5.3       160       180        76
IR     2025250     91400   22.2900 -107.8800      13.6        78       172        99
IR     2025250     91400   22.2400 -108.0700      11.1        81       189        96
IR     2025250     91400   22.2400 -108.2000       9.1        83       200        93
IR     2025250     91400   22.2000 -108.5400       7.1        62       268        91
IR     2025250     91400   22.2400 -108.6800       5.3        22       230        91
IR     2025250     91400   22.1900 -108.8000       6.0       322       205        99
IR     2025250     91400   22.2700 -108.8700       6.1       298       207        93
IR     2025250     91400   22.1700 -109.2300       5.1       280       177        68
IR     2025250     91400   22.2500 -109.3100       5.7       271       206        95
IR     2025250     91400   22.2300 -109.9600       4.8       308       177        97
IR     2025250     91400   22.2300 -109.9800       4.5       311       179        97
IR     2025250     91400   22.1900 -110.3900       4.1        57       187        91
IR     2025250     91400   22.1500 -110.5300       4.1        54       190        89
IR     2025250     91400   22.1100 -110.8500       7.9       349       175        97
IR     2025250     91400   22.1700 -111.0100       7.7       348       193        94
IR     2025250     91400   22.1000 -111.1000       5.5       341       214        90
IR     2025250     91400   22.0600 -112.3900       4.5       118       234        99
IR     2025250     91400   22.0800 -112.4300       5.1       113       233        98
IR     2025250     91400   22.0500 -112.5500       4.9       114       273        95
IR     2025250     91400   22.1100 -113.0800       6.3       106       215        99
IR     2025250     91400   22.1100 -113.1100       6.3       108       215        99
IR     2025250     91400   22.1000 -113.6300       8.3        84       421        85
IR     2025250     91400   22.0900 -113.7700       7.8        97       421        93
IR     2025250     91400   22.0900 -113.8900       8.4       104       414       100
IR     2025250     91400   22.0400 -114.0200       8.5       125       365        94
IR     2025250     91400   22.0200 -114.0700       7.9       135       352        92
IR     2025250     91400   22.0600 -114.1700       8.9       143       348        92
IR     2025250     91400   21.9900 -114.3800       9.7       146       328        94
IR     2025250     91400   22.0500 -114.4300      12.8       114       543       100
IR     2025250     91400   22.0000 -114.7200      12.3       122       462        96
IR     2025250     91400   22.0500 -114.9200      10.5       144       359        79
IR     2025250     91400   22.0100 -115.0200      10.7       145       347        88
IR     2025250     91400   22.0300 -115.1100      10.5       143       313        93
IR     2025250     91400   21.9800 -115.1900      10.9       138       303        98
IR     2025250     91400   22.0000 -115.3200      11.5       140       337        96
IR     2025250     91400   22.0400 -115.4500      12.3       144       359        93
IR     2025250     91400   21.9500 -115.6100      11.7       140       348       100
IR     2025250     91400   22.0100 -115.7100      11.5       147       356       100
IR     2025250     91400   21.9400 -115.8300      10.7       160       330        99
IR     2025250     91400   21.9400 -115.9300      11.3       162       328       100
IR     2025250     91400   21.9700 -116.0800      13.0       165       347       100
IR     2025250     91400   21.9700 -116.1000      13.2       165       347       100
IR     2025250     91400   21.9500 -116.2600      13.5       157       332        97
IR     2025250     91400   21.9200 -116.3800      12.5       154       302        98
IR     2025250     91400   21.9200 -116.5000      11.5       150       298        99
IR     2025250     91400   21.9800 -116.5500      11.6       152       299        99
IR     2025250     91400   21.9500 -116.7400      10.7       150       365        98
IR     2025250     91400   21.9700 -116.8700      11.3       155       366       100
IR     2025250     91400   21.9900 -116.8900      11.4       155       385       100
IR     2025250     91400   21.9600 -117.0500      11.1       154       379        93
IR     2025250     91400   21.9000 -117.2000       8.9       152       365       100
IR     2025250     91400   21.9600 -117.2700       8.7       148       363        99
IR     2025250     91400   21.9700 -117.4300      10.2       154       325        99
IR     2025250     91400   21.9500 -117.5400       9.7       155       309        99
IR     2025250     91400   21.9700 -117.5600       9.6       155       314        99
IR     2025250     91400   21.9000 -117.6900       8.5       151       283        88
IR     2025250     91400   21.9400 -117.9900       5.7       152       303        99
IR     2025250     91400   21.9300 -118.1900       4.5       158       313       100
IR     2025250     91400   21.9500 -118.2100       4.7       158       312       100
IR     2025250     91400   21.9000 -118.5100       4.6       158       185        70
IR     2025250     91400   21.9000 -118.6400       5.4       166       182        60
IR     2025250     91400   22.1300 -107.7000      10.8        84       185        97
IR     2025250     91400   22.1200 -107.9000       9.8        87       186        98
IR     2025250     91400   22.1800 -108.0100      11.1        83       190       100
IR     2025250     91400   22.2000 -108.1400      10.7        82       196        94
IR     2025250     91400   22.1100 -108.2900      10.0        83       211        99
IR     2025250     91400   22.1500 -108.7600       5.2       335       203        95
IR     2025250     91400   22.1700 -108.8000       6.3       318       203        99
IR     2025250     91400   22.1200 -108.9400       7.8       289       176        92
IR     2025250     91400   22.0800 -109.0800       7.3       286       162        90
IR     2025250     91400   22.0700 -110.8900       7.4       350       184        97
IR     2025250     91400   22.0000 -110.9800       5.8       358       208        98
IR     2025250     91400   22.0200 -111.1200       5.4       350       224        78
IR     2025250     91400   22.0600 -111.1600       4.8       341       222        76
IR     2025250     91400   21.9800 -111.7400       5.7        54       274        89
IR     2025250     91400   22.0600 -111.7600       6.0        70       265        89
IR     2025250     91400   22.0300 -112.5400       4.6       116       288        96
IR     2025250     91400   21.9300 -113.1800       4.1        94       252        99
IR     2025250     91400   21.9500 -113.5200       7.0       105       349        84
IR     2025250     91400   21.9700 -113.6100      10.4        91       381        82
IR     2025250     91400   21.9500 -113.7300      10.7       105       343        98
IR     2025250     91400   21.9000 -113.8200      10.2       119       318        98
IR     2025250     91400   21.9200 -113.9500       8.7       125       320        98
IR     2025250     91400   21.9600 -114.0600       7.0       137       344        94
IR     2025250     91400   21.9100 -114.1900       7.7       148       309        98
IR     2025250     91400   21.9500 -114.2700       9.1       150       316        98
IR     2025250     91400   21.8800 -114.3800       9.7       146       305        90
IR     2025250     91400   21.8800 -114.5600      11.5       121       334        99
IR     2025250     91400   21.9000 -114.6500      11.2       123       397        98
IR     2025250     91400   21.8700 -114.8200      12.2       128       427       100
IR     2025250     91400   21.8900 -114.8400      12.0       130       429       100
IR     2025250     91400   21.9500 -115.0100      11.5       139       360        94
IR     2025250     91400   21.9400 -115.1300      11.2       133       317        98
IR     2025250     91400   21.9000 -115.1800      11.7       128       305        99
IR     2025250     91400   21.8500 -115.5400      12.6       144       333       100
IR     2025250     91400   21.8400 -115.7200      11.2       160       296       100
IR     2025250     91400   21.9200 -115.7900      10.7       160       327        99
IR     2025250     91400   21.9200 -115.9300      11.3       163       326       100
IR     2025250     91400   21.8300 -115.9700      12.2       168       306       100
IR     2025250     91400   21.8300 -116.1800      12.4       165       303        98
IR     2025250     91400   21.8300 -116.2200      11.9       165       281        98
IR     2025250     91400   21.9000 -116.3900      12.1       154       294       100
IR     2025250     91400   21.8800 -116.4100      11.4       154       284       100
IR     2025250     91400   21.8400 -116.5400      10.6       153       284        99
IR     2025250     91400   21.8100 -116.7000      10.8       156       328       100
IR     2025250     91400   21.8100 -116.7700      10.6       158       334       100
IR     2025250     91400   21.8200 -116.9400      10.3       159       304        99
IR     2025250     91400   21.8400 -116.9800      10.6       158       305        99
IR     2025250     91400   21.8800 -117.1800       9.1       153       365       100
IR     2025250     91400   21.7900 -117.2400       7.8       154       355        99
IR     2025250     91400   21.7900 -117.4200       7.8       163       324        99
IR     2025250     91400   21.8500 -117.4800       9.1       161       277       100
IR     2025250     91400   21.8700 -117.5600       9.5       160       233        98
IR     2025250     91400   21.8600 -117.7000       8.6       152       250        82
IR     2025250     91400   21.7900 -117.9800       4.9       163       260        92
IR     2025250     91400   21.8500 -118.1400       4.5       155       291       100
IR     2025250     91400   22.0200 -107.8100      10.0        90       187        91
IR     2025250     91400   22.1000 -107.9100       9.6        89       187        96
IR     2025250     91400   22.1000 -107.9400       9.7        88       188        97
IR     2025250     91400   22.1000 -108.0700      10.1        87       197        95
IR     2025250     91400   22.0000 -108.4500       8.7        85       189        84
IR     2025250     91400   22.0000 -108.4800       8.3        82       187        74
IR     2025250     91400   22.0100 -108.7300       4.0       330       167        63
IR     2025250     91400   22.0000 -108.8500       7.0       302       160        76
IR     2025250     91400   22.0600 -109.0400       7.2       286       164        88
IR     2025250     91400   22.0500 -109.0900       7.1       288       158        89
IR     2025250     91400   21.9400 -109.9700      11.3        89       134        89
IR     2025250     91400   21.9300 -110.0900      11.3        95       140        63
IR     2025250     91400   21.9500 -110.1600       9.6        99       142        87
IR     2025250     91400   22.0100 -110.2700       6.4       101       153        86
IR     2025250     91400   21.9800 -110.9400       4.6       360       203        99
IR     2025250     91400   21.9800 -110.9600       4.8       360       208       100
IR     2025250     91400   21.8800 -112.8100       4.6        86       285        97
IR     2025250     91400   21.8700 -112.8800       6.6        90       280        98
IR     2025250     91400   21.8100 -113.6300      11.3       120       314        95
IR     2025250     91400   21.8600 -113.7300      10.7       122       315       100
IR     2025250     91400   21.8800 -113.7500      10.4       121       319       100
IR     2025250     91400   21.7900 -113.9800       9.3       139       276        95
IR     2025250     91400   21.8300 -114.2800       8.6       155       296        91
IR     2025250     91400   21.8600 -114.3600       9.6       149       304        94
IR     2025250     91400   21.8000 -114.5400      10.8       127       303        95
IR     2025250     91400   21.8200 -114.5600      11.2       123       311        99
IR     2025250     91400   21.7700 -114.7300      10.8       128       327        98
IR     2025250     91400   21.7600 -114.8900      10.8       132       341       100
IR     2025250     91400   21.7600 -115.0100      11.5       128       340       100
IR     2025250     91400   21.7600 -115.1200      11.6       118       297       100
IR     2025250     91400   21.8200 -115.1800      12.1       120       299        98
IR     2025250     91400   21.7800 -115.7100      11.4       161       270       100
IR     2025250     91400   21.7600 -115.8100      11.9       167       263       100
IR     2025250     91400   21.7700 -116.1400      12.1       167       261        95
IR     2025250     91400   21.8100 -116.2000      11.9       166       273        99
IR     2025250     91400   21.8000 -116.4100       9.5       155       261       100
IR     2025250     91400   21.8000 -116.4300       9.4       154       265       100
IR     2025250     91400   21.7300 -116.6300      10.5       155       312        99
IR     2025250     91400   21.7100 -116.7000      10.5       160       332       100
IR     2025250     91400   21.7200 -116.8300       9.9       162       334       100
IR     2025250     91400   21.7800 -116.9500       9.6       159       304        99
IR     2025250     91400   21.7800 -117.0000       9.4       158       304        98
IR     2025250     91400   21.7000 -117.5300       7.3       167       271        98
IR     2025250     91400   21.7600 -117.7200       8.5       156       242        87
IR     2025250     91400   21.7600 -117.7400       8.3       156       265        91
IR     2025250     91400   21.7300 -118.0500       4.3       175       262        97
IR     2025250     91400   21.6500 -118.6900       4.5       128       228        82
IR     2025250     91400   21.6900 -118.7500       4.1       126       200        60
IR     2025250     91400   22.0000 -107.8100      10.0        90       187        89
IR     2025250     91400   21.9100 -107.9700       8.9        94       198        96
IR     2025250     91400   21.9100 -108.0500       9.0        94       203        99
IR     2025250     91400   21.9700 -108.4800       7.9        81       164        70
IR     2025250     91400   21.9600 -108.7400       4.2       326       153        62
IR     2025250     91400   21.9600 -108.8700       7.1       298       144        65
IR     2025250     91400   21.9500 -108.9900       7.9       288       141        71
IR     2025250     91400   21.8900 -109.6600       5.1       334       122        64
IR     2025250     91400   21.9200 -109.9500      10.2        86       134        93
IR     2025250     91400   21.9200 -109.9700      11.2        87       135        89
IR     2025250     91400   21.8700 -110.1100      11.5        88       141        70
IR     2025250     91400   21.8900 -110.2500       9.0        93       147        72
IR     2025250     91400   21.8200 -112.7800       4.0        84       279        89
IR     2025250     91400   21.7900 -113.4400       7.6       127       313        89
IR     2025250     91400   21.7400 -113.8100      11.0       147       296       100
IR     2025250     91400   21.7700 -114.1500       7.0       141       281        93
IR     2025250     91400   21.6800 -114.3100       6.5       153       280        88
IR     2025250     91400   21.7200 -114.3700       7.5       146       287        91
IR     2025250     91400   21.6900 -114.5600       8.4       132       287        97
IR     2025250     91400   21.6700 -114.6400       8.1       138       283        99
IR     2025250     91400   21.6600 -114.8000       8.9       137       282        89
IR     2025250     91400   21.6800 -114.8200       9.5       135       283        90
IR     2025250     91400   21.7400 -115.1300      11.5       117       270       100
IR     2025250     91400   21.6800 -115.5500      13.7       153       263       100
IR     2025250     91400   21.7000 -115.5900      13.6       156       263       100
IR     2025250     91400   21.7000 -115.7700      12.5       163       231        99
IR     2025250     91400   21.7200 -115.7900      12.1       164       241       100
IR     2025250     91400   21.6700 -115.9400      12.0       162       251        97
IR     2025250     91400   21.6800 -116.1200      11.8       166       241        91
IR     2025250     91400   21.7000 -116.1400      12.1       166       240        92
IR     2025250     91400   21.7000 -116.3400       9.7       164       228        88
IR     2025250     91400   21.6900 -116.4500       9.2       154       232        98
IR     2025250     91400   21.6100 -116.5800       9.8       157       235        99
IR     2025250     91400   21.6900 -116.6800      10.6       161       326       100
IR     2025250     91400   21.6500 -116.7100      10.7       164       311       100
IR     2025250     91400   21.6800 -116.8600       9.8       163       335       100
IR     2025250     91400   21.6600 -116.9600       9.2       159       330        98
IR     2025250     91400   21.6700 -117.1300       9.1       157       341        93
IR     2025250     91400   21.6500 -117.1600       9.2       157       352        95
IR     2025250     91400   21.6300 -117.3600       8.1       165       345        98
IR     2025250     91400   21.6600 -117.5800       7.5       167       279        96
IR     2025250     91400   21.5400 -118.7700       4.6       135       234        72
IR     2025250     91400   21.9000 -107.8500      10.1        92       191        92
IR     2025250     91400   21.8700 -107.9800       8.6        94       202        93
IR     2025250     91400   21.8900 -108.0000       8.9        94       202        97
IR     2025250     91400   21.8600 -108.1400       8.5        96       202        96
IR     2025250     91400   21.8200 -108.2800       7.9        94       155        68
IR     2025250     91400   21.7300 -110.0000       6.3        84       137        98
IR     2025250     91400   21.7800 -110.1800      10.9        83       147        73
IR     2025250     91400   21.8000 -110.2800       9.4        81       151        72
IR     2025250     91400   21.6300 -112.7800       5.8        90       266        93
IR     2025250     91400   21.6900 -112.8300       5.6        94       272        86
IR     2025250     91400   21.6400 -112.9600       5.2        96       272        99
IR     2025250     91400   21.7000 -113.0700       4.2       110       284        95
IR     2025250     91400   21.5900 -114.0100       6.8       158       269        87
IR     2025250     91400   21.5900 -114.0800       6.5       156       267        83
IR     2025250     91400   21.6200 -114.1600       6.9       149       269        91
IR     2025250     91400   21.6600 -114.2900       6.4       159       276        86
IR     2025250     91400   21.5700 -114.4000       5.2       171       270        78
IR     2025250     91400   21.6300 -114.5800       6.4       147       279        96
IR     2025250     91400   21.6300 -114.6500       7.2       147       281        99
IR     2025250     91400   21.6500 -114.7100       8.1       143       283        97
IR     2025250     91400   21.6400 -114.8700       8.2       140       275        99
IR     2025250     91400   21.5900 -115.0400       8.9       150       244       100
IR     2025250     91400   21.5500 -115.1400       8.8       149       215       100
IR     2025250     91400   21.5500 -115.1900       9.6       144       214        97
IR     2025250     91400   21.5600 -115.5500      14.3       154       225        96
IR     2025250     91400   21.5300 -115.7000      14.6       163       219        99
IR     2025250     91400   21.5300 -115.7400      14.5       163       220        99
IR     2025250     91400   21.6100 -115.9300      12.0       161       232        97
IR     2025250     91400   21.5500 -115.9700      11.9       158       231        97
IR     2025250     91400   21.6000 -116.0700      10.7       163       241        97
IR     2025250     91400   21.5200 -116.2200      10.5       168       236       100
IR     2025250     91400   21.5100 -116.4000      10.9       165       219        96
IR     2025250     91400   21.5100 -116.4200      11.0       163       219        95
IR     2025250     91400   21.5700 -116.6200      10.5       158       234        98
IR     2025250     91400   21.5200 -116.7100      11.0       169       261       100
IR     2025250     91400   21.5200 -116.8300      11.1       169       297       100
IR     2025250     91400   21.5800 -116.9500      10.2       160       339       100
IR     2025250     91400   21.5800 -116.9900       9.9       158       340       100
IR     2025250     91400   21.5100 -117.1200      10.5       161       364        98
IR     2025250     91400   21.4800 -117.2800      10.3       166       361       100
IR     2025250     91400   21.5200 -117.3800      10.0       167       352       100
IR     2025250     91400   21.5100 -117.7000       7.6       164       293        90
IR     2025250     91400   21.5300 -117.7800       6.9       158       289        88
IR     2025250     91400   21.5500 -117.8500       6.5       152       288        94
IR     2025250     91400   21.4800 -118.2600       5.3       177       272        99
IR     2025250     91400   21.4500 -118.3300       5.2       172       287       100
IR     2025250     91400   21.5100 -118.5800       4.4       130       298        79
IR     2025250     91400   21.7600 -108.1400       7.6        94       182        88
IR     2025250     91400   21.7800 -108.1600       8.2        97       177        86
IR     2025250     91400   21.7100 -108.3100       8.7        91       148        70
IR     2025250     91400   21.6900 -108.4400       7.8        82       114        66
IR     2025250     91400   21.7000 -108.6400       7.3        42       107        75
IR     2025250     91400   21.6200 -110.1800       9.4        84       150        99
IR     2025250     91400   21.6200 -110.2100      10.1        82       152        99
IR     2025250     91400   21.6700 -110.3600       8.4        82       160        71
IR     2025250     91400   21.6000 -111.2600       4.1        28       220        95
IR     2025250     91400   21.6600 -111.4100       4.0        23       231        97
IR     2025250     91400   21.5700 -111.6500       4.2       340       234        93
IR     2025250     91400   21.5300 -113.4200       6.3       170       287        78
IR     2025250     91400   21.5500 -113.9700       6.7       157       273        94
IR     2025250     91400   21.5700 -113.9900       6.6       155       272        96
IR     2025250     91400   21.5600 -114.1800       6.0       165       271        93
IR     2025250     91400   21.5600 -114.2500       6.0       170       270        99
IR     2025250     91400   21.5500 -114.3900       5.3       171       267        83
IR     2025250     91400   21.5500 -114.5200       4.4       176       265        95
IR     2025250     91400   21.5000 -114.6500       5.7       162       259        97
IR     2025250     91400   21.5000 -114.7000       6.7       161       264        95
IR     2025250     91400   21.4800 -114.8400       9.2       154       273        99
IR     2025250     91400   21.4800 -114.9300      10.1       158       269        99
IR     2025250     91400   21.4500 -115.0500      11.6       162       244        99
IR     2025250     91400   21.4300 -115.6500      14.0       163       220       100
IR     2025250     91400   21.4500 -115.6900      14.6       164       217       100
IR     2025250     91400   21.4300 -115.8100      13.8       157       219        97
IR     2025250     91400   21.4800 -116.0000      11.4       152       233       100
IR     2025250     91400   21.4400 -116.1200       9.8       155       240        99
IR     2025250     91400   21.5000 -116.1600      10.5       161       243        99
IR     2025250     91400   21.4500 -116.2800      11.0       168       236        99
IR     2025250     91400   21.4900 -116.4300      11.2       165       219        97
IR     2025250     91400   21.4900 -116.5600      11.0       163       228        99
IR     2025250     91400   21.4600 -116.6400      11.2       164       240       100
IR     2025250     91400   21.4200 -116.8000      11.6       170       286       100
IR     2025250     91400   21.4400 -116.8400      11.8       168       297       100
IR     2025250     91400   21.4500 -117.0200      11.6       158       350       100
IR     2025250     91400   21.4300 -117.0500      11.7       158       361       100
IR     2025250     91400   21.3800 -117.3900      11.6       170       348       100
IR     2025250     91400   21.4300 -117.7600       8.2       167       293        99
IR     2025250     91400   21.3900 -117.8100       8.7       167       287       100
IR     2025250     91400   21.3600 -118.1000       4.2       174       222        98
IR     2025250     91400   21.4400 -118.2700       4.8       178       287        98
IR     2025250     91400   21.3500 -118.3300       4.0       177       302        96
IR     2025250     91400   21.5900 -108.1400       4.4        66       179        74
IR     2025250     91400   21.6100 -108.2700       6.2        72       165        84
IR     2025250     91400   21.6700 -108.3700       8.0        82       133        68
IR     2025250     91400   21.6000 -108.4700       7.5        68       121        72
IR     2025250     91400   21.5700 -108.6500       8.0        63       109        77
IR     2025250     91400   21.5900 -108.7800       9.9        65       107        98
IR     2025250     91400   21.5700 -108.8600      10.0        64       107        83
IR     2025250     91400   21.5400 -109.4600       7.6        84       112        83
IR     2025250     91400   21.5800 -109.6500       4.2        91       116        85
IR     2025250     91400   21.6000 -110.1600       7.4        89       149        85
IR     2025250     91400   21.5900 -110.3400       8.6        87       163        60
IR     2025250     91400   21.5100 -110.8900       5.2        18       247        98
IR     2025250     91400   21.5100 -110.9700       6.5        26       259        90
IR     2025250     91400   21.5200 -111.1300       5.8        22       252        98
IR     2025250     91400   21.5000 -111.2600       5.3        23       221        97
IR     2025250     91400   21.4700 -111.3900       5.0         1       220        98
IR     2025250     91400   21.5300 -111.4000       4.1         3       223        98
IR     2025250     91400   21.5200 -111.7400       4.7       330       235        95
IR     2025250     91400   21.4700 -112.1600       9.4        49       246        93
IR     2025250     91400   21.4700 -113.3400       7.7       176       273        69
IR     2025250     91400   21.4000 -113.4200       8.6       164       284       100
IR     2025250     91400   21.4400 -113.5800       8.2       167       301        99
IR     2025250     91400   21.4100 -114.3700       6.5       160       251       100
IR     2025250     91400   21.4100 -114.4400       6.0       159       244        94
IR     2025250     91400   21.4300 -114.5500       5.6       168       244        99
IR     2025250     91400   21.3800 -114.6800       7.6       151       245        93
IR     2025250     91400   21.4200 -114.8100       9.6       153       268        98
IR     2025250     91400   21.4000 -114.8600      10.9       151       272        98
IR     2025250     91400   21.3500 -115.0500      14.0       158       271        98
IR     2025250     91400   21.3700 -115.0900      13.4       159       271        99
IR     2025250     91400   21.3400 -115.3100      12.1       161       267       100
IR     2025250     91400   21.3600 -115.3900      11.6       159       269        89
IR     2025250     91400   21.3900 -115.6400      13.3       165       219        99
IR     2025250     91400   21.3700 -115.7500      13.7       159       213        95
IR     2025250     91400   21.3800 -115.8600      11.9       153       221        97
IR     2025250     91400   21.3200 -116.0600       8.5       144       227       100
IR     2025250     91400   21.3100 -116.1500       8.8       151       228       100
IR     2025250     91400   21.3700 -116.2500      10.0       161       238        99
IR     2025250     91400   21.3300 -116.4200      11.5       166       222       100
IR     2025250     91400   21.3500 -116.4600      11.6       167       225       100
IR     2025250     91400   21.3400 -116.6200      11.7       171       236       100
IR     2025250     91400   21.3800 -116.7000      11.3       169       250       100
IR     2025250     91400   21.3700 -116.8600      12.1       168       289       100
IR     2025250     91400   21.3500 -116.9700      12.4       161       303       100
IR     2025250     91400   21.3700 -116.9900      12.5       159       317       100
IR     2025250     91400   21.3700 -117.1000      11.8       160       363        99
IR     2025250     91400   21.3600 -117.2400      11.3       167       370        99
IR     2025250     91400   21.3600 -117.4200      12.1       169       348        99
IR     2025250     91400   21.3600 -117.4400      12.4       168       346        99
IR     2025250     91400   21.2700 -117.6600      12.7       171       286        99
IR     2025250     91400   21.2700 -117.6800      12.4       171       283        99
IR     2025250     91400   21.3200 -117.8700       9.2       165       265       100
IR     2025250     91400   21.2600 -117.9500       7.4       167       230       100
IR     2025250     91400   21.3400 -118.0000       5.7       169       236        98
IR     2025250     91400   21.4900 -108.2300       5.7        63       182        91
IR     2025250     91400   21.5400 -108.4100       7.0        65       152        80
IR     2025250     91400   21.4800 -108.5100       6.5        59       150        71
IR     2025250     91400   21.4700 -108.6900       6.8        72       117        62
IR     2025250     91400   21.4900 -108.7300       6.9        71       111        65
IR     2025250     91400   21.5000 -108.9500       8.6        62       105        82
IR     2025250     91400   21.5200 -108.9700       9.6        58       104        72
IR     2025250     91400   21.5300 -109.1900       7.5        53       105        64
IR     2025250     91400   21.5100 -109.2500       7.8        63       105        66
IR     2025250     91400   21.4800 -109.3500       8.8        74       107        69
IR     2025250     91400   21.5000 -109.4700       7.6        81       110        80
IR     2025250     91400   21.4700 -109.6800       5.5        80       115        81
IR     2025250     91400   21.4300 -109.7700       4.3        69       117        89
IR     2025250     91400   21.4100 -110.3400       6.8        96       167        93
IR     2025250     91400   21.4400 -110.4500       4.9        77       180        81
IR     2025250     91400   21.3900 -110.8800       5.5         5       238        93
IR     2025250     91400   21.3800 -110.9800       8.3        18       255        94
IR     2025250     91400   21.4600 -111.1300       7.0        17       267        99
IR     2025250     91400   21.4600 -111.2500       6.4        19       241       100
IR     2025250     91400   21.4300 -111.3700       5.3         1       219        99
IR     2025250     91400   21.3700 -111.4900       4.7       352       219        99
IR     2025250     91400   21.4000 -111.6700       5.0       332       225       100
IR     2025250     91400   21.4200 -111.6900       5.1       327       226       100
IR     2025250     91400   21.3600 -112.1300       6.9        35       241        86
IR     2025250     91400   21.4200 -112.1900       9.0        48       244        93
IR     2025250     91400   21.3700 -113.2700       8.0       179       255        93
IR     2025250     91400   21.3400 -113.3900      10.5       170       274        94
IR     2025250     91400   21.3100 -113.5800       9.9       164       287        96
IR     2025250     91400   21.3300 -113.6000       9.7       166       298        93
IR     2025250     91400   21.2900 -113.7300       9.2       170       285        98
IR     2025250     91400   21.3000 -114.1400       5.6       133       250        82
IR     2025250     91400   21.3200 -114.1600       5.3       136       251        80
IR     2025250     91400   21.2700 -114.3600       7.4       125       247        84
IR     2025250     91400   21.2600 -114.5000       8.6       143       242        98
IR     2025250     91400   21.3200 -114.6000       7.7       157       242        97
IR     2025250     91400   21.3400 -114.6200       7.5       154       240        97
IR     2025250     91400   21.3000 -114.7700      10.9       152       263        90
IR     2025250     91400   21.2500 -114.9600      14.4       158       263        87
IR     2025250     91400   21.2900 -115.0400      14.2       154       269       100
IR     2025250     91400   21.2900 -115.0900      14.1       154       270       100
IR     2025250     91400   21.2900 -115.5000      11.9       157       227        90
IR     2025250     91400   21.3100 -115.5800      12.5       157       214        91
IR     2025250     91400   21.3100 -115.6300      12.9       157       210        92
IR     2025250     91400   21.2200 -115.8300      12.4       156       209        96
IR     2025250     91400   21.3000 -115.8800      10.9       151       219        98
IR     2025250     91400   21.2800 -116.0700       8.0       145       224       100
IR     2025250     91400   21.2500 -116.1400       8.6       151       221       100
IR     2025250     91400   21.2500 -116.2500      10.8       155       216       100
IR     2025250     91400   21.2400 -116.4100      11.4       162       222       100
IR     2025250     91400   21.2400 -116.5300      11.6       169       228       100
IR     2025250     91400   21.2400 -116.6400      11.9       175       232        99
IR     2025250     91400   21.1900 -116.7600      12.4       169       223        97
IR     2025250     91400   21.1900 -116.8000      12.5       169       219        97
IR     2025250     91400   21.2300 -116.9300      12.3       164       269        98
IR     2025250     91400   21.2200 -117.2000      12.1       167       355        99
IR     2025250     91400   21.2200 -117.4000      12.4       170       335       100
IR     2025250     91400   21.2100 -117.5100      12.4       170       299        98
IR     2025250     91400   21.2300 -117.5300      12.9       170       302        98
IR     2025250     91400   21.2300 -117.7300      11.5       174       258        99
IR     2025250     91400   21.2300 -117.7500      11.3       174       255        99
IR     2025250     91400   21.2400 -117.9500       7.3       168       228       100
IR     2025250     91400   21.2200 -118.0000       6.2       171       187        99
IR     2025250     91400   21.1900 -118.1100       4.0       167       184        93
IR     2025250     91400   21.4700 -108.2300       6.2        64       185        93
IR     2025250     91400   21.4600 -108.2600       6.3        62       180        94
IR     2025250     91400   21.4000 -108.4000       6.7        50       172        90
IR     2025250     91400   21.4500 -108.5900       6.4        60       144        71
IR     2025250     91400   21.4500 -108.6400       6.4        63       135        69
IR     2025250     91400   21.4200 -108.7700       6.5        69       116        72
IR     2025250     91400   21.4000 -108.9600       7.1        44       107        82
IR     2025250     91400   21.3500 -109.0400       7.5        33       105        86
IR     2025250     91400   21.4300 -109.1500       8.6        32       103        70
IR     2025250     91400   21.3600 -109.3400       5.7        83       103        67
IR     2025250     91400   21.4200 -109.5000       7.2        78       107        74
IR     2025250     91400   21.3700 -109.6100       5.7        73       108        63
IR     2025250     91400   21.3700 -109.7300       4.5        51       111        85
IR     2025250     91400   21.3600 -109.8100       4.2        43       115        92
IR     2025250     91400   21.3700 -110.8600       5.1         3       233        90
IR     2025250     91400   21.3000 -110.9000       6.1        14       242        82
IR     2025250     91400   21.3400 -111.0400       9.4        17       263        90
IR     2025250     91400   21.3100 -111.1900       9.8        18       271        99
IR     2025250     91400   21.3500 -111.3000       7.0        12       253        99
IR     2025250     91400   21.2600 -111.4900       4.4       359       219        95
IR     2025250     91400   21.3200 -112.1400       5.0        25       235        86
IR     2025250     91400   21.1900 -113.5200      10.1       171       256       100
IR     2025250     91400   21.2100 -113.6500      10.8       166       246        99
IR     2025250     91400   21.2300 -113.7000      10.5       169       247       100
IR     2025250     91400   21.1800 -113.8700       9.8       173       233       100
IR     2025250     91400   21.2400 -113.9700       7.2       154       246       100
IR     2025250     91400   21.1700 -114.1500       7.6       118       243        97
IR     2025250     91400   21.1900 -114.1700       7.3       114       243        91
IR     2025250     91400   21.2300 -114.3700       8.2       118       248        88
IR     2025250     91400   21.2400 -114.4800       8.6       137       244        98
IR     2025250     91400   21.1800 -114.5900       8.9       140       253        99
IR     2025250     91400   21.2200 -114.6200       8.7       146       245        96
IR     2025250     91400   21.2100 -114.7400      10.7       147       262        98
IR     2025250     91400   21.1800 -115.2700      13.6       159       233        95
IR     2025250     91400   21.2100 -115.3800      13.1       161       218        94
IR     2025250     91400   21.2100 -115.5200      12.4       157       211        94
IR     2025250     91400   21.1300 -115.6200      12.2       155       208        95
IR     2025250     91400   21.1200 -115.7800      12.7       162       204       100
IR     2025250     91400   21.1200 -115.8800      12.0       163       207       100
IR     2025250     91400   21.1600 -115.9600      10.4       159       214        99
IR     2025250     91400   21.1900 -116.1300       8.9       152       217        98
IR     2025250     91400   21.1100 -116.2600      11.6       153       209       100
IR     2025250     91400   21.1000 -116.4000      11.4       155       214       100
IR     2025250     91400   21.1400 -116.4100      11.2       157       214       100
IR     2025250     91400   21.1400 -116.5700      11.4       169       221       100
IR     2025250     91400   21.1700 -116.7200      12.3       170       203        99
IR     2025250     91400   21.1700 -116.7400      12.5       169       202        99
IR     2025250     91400   21.1700 -116.8800      12.5       166       208        99
IR     2025250     91400   21.1000 -117.0700      11.0       162       223       100
IR     2025250     91400   21.0700 -117.3800      10.2       167       290       100
IR     2025250     91400   21.0700 -117.4100      10.0       167       285       100
IR     2025250     91400   21.0700 -117.5200       9.5       169       263        98
IR     2025250     91400   21.0700 -117.6500       9.5       168       244        97
IR     2025250     91400   21.1200 -117.8000       9.4       172       219        99
IR     2025250     91400   21.0600 -117.9200       5.7       169       166        96
IR     2025250     91400   21.0600 -117.9900       4.5       168       175        86
IR     2025250     91400   21.1400 -118.0600       4.6       172       183        95
IR     2025250     91400   21.2800 -108.1300      10.5        83       240        99
IR     2025250     91400   21.2700 -108.4200       7.4        74       226        83
IR     2025250     91400   21.2700 -108.5900       5.7        63       170        90
IR     2025250     91400   21.2800 -108.7400       5.1        23       160        97
IR     2025250     91400   21.2600 -108.8000       5.1        42       156        63
IR     2025250     91400   21.2500 -108.9200       6.3        58       132        81
IR     2025250     91400   21.3300 -109.0300       6.7        43       105        73
IR     2025250     91400   21.2600 -109.1700       7.4        24       103        75
IR     2025250     91400   21.2400 -109.8200       5.7       338       105        88
IR     2025250     91400   21.2800 -109.9600       4.9       355       111        68
IR     2025250     91400   21.1900 -110.7100       4.0         3       223        89
IR     2025250     91400   21.1800 -110.8800       6.2        21       236        99
IR     2025250     91400   21.2600 -111.0300       8.8        20       255        88
IR     2025250     91400   21.2200 -111.0700       9.4        22       255        95
IR     2025250     91400   21.1700 -111.3000      10.0        31       252        94
IR     2025250     91400   21.1900 -111.3400       9.1        28       226        89
IR     2025250     91400   21.1800 -111.4900       4.6        13       219        86
IR     2025250     91400   21.1700 -113.5000      10.1       173       250        99
IR     2025250     91400   21.1700 -113.6400      10.8       170       235        98
IR     2025250     91400   21.1600 -113.8300      10.0       174       229       100
IR     2025250     91400   21.1400 -113.9500       8.9       161       235        94
IR     2025250     91400   21.0700 -114.0300       8.3       143       240        85
IR     2025250     91400   21.0600 -114.3100      10.6       103       254        87
IR     2025250     91400   21.1200 -114.4400       9.0       115       250        75
IR     2025250     91400   21.1400 -114.6000       8.9       133       258        99
IR     2025250     91400   21.0700 -114.7500      10.5       142       266        91
IR     2025250     91400   21.0800 -115.0700      12.8       148       222        97
IR     2025250     91400   21.1100 -115.3800      13.6       157       215        91
IR     2025250     91400   21.1100 -115.4700      12.4       155       208        95
IR     2025250     91400   21.1100 -115.5400      12.2       151       208        98
IR     2025250     91400   21.1000 -115.6300      12.2       154       207        98
IR     2025250     91400   21.0800 -115.8200      12.5       162       191       100
IR     2025250     91400   21.1000 -115.8600      12.3       163       205       100
IR     2025250     91400   21.0900 -115.9700      11.1       161       208       100
IR     2025250     91400   21.0100 -116.1700      12.0       157       199       100
IR     2025250     91400   21.0800 -116.2900      11.9       152       209       100
IR     2025250     91400   21.0400 -116.3200      12.1       153       209       100
IR     2025250     91400   21.0600 -116.4700      11.5       160       219        99
IR     2025250     91400   21.0300 -116.6100      11.6       168       199        99
IR     2025250     91400   21.0700 -116.6500      12.1       171       198        98
IR     2025250     91400   20.9900 -116.8000      13.6       166       197        97
IR     2025250     91400   21.0000 -116.9500      11.9       162       200        98
IR     2025250     91400   21.0600 -117.0800      10.3       163       208       100
IR     2025250     91400   21.0400 -117.1000       9.8       164       211       100
IR     2025250     91400   20.9700 -117.3200       8.1       169       230       100
IR     2025250     91400   21.0500 -117.3900       9.7       166       285       100
IR     2025250     91400   20.9900 -117.4900       8.0       163       240       100
IR     2025250     91400   20.9600 -117.8500       5.2       160       167        97
IR     2025250     91400   21.0400 -117.9400       4.8       167       166        94
IR     2025250     91400   21.0400 -117.9900       4.0       166       170        88
IR     2025250     91400   21.2000 -108.1900      10.2        84       254       100
IR     2025250     91400   21.1700 -108.3200       9.3        85       256        94
IR     2025250     91400   21.2500 -108.5700       6.0        67       175        89
IR     2025250     91400   21.1500 -108.8000       5.2        58       169        60
IR     2025250     91400   21.2400 -108.8000       5.4        39       158        64
IR     2025250     91400   21.2100 -108.9300       6.8        55       139        84
IR     2025250     91400   21.1600 -109.7200       5.7       283       105        62
IR     2025250     91400   21.1800 -109.8600       6.4       317       104        80
IR     2025250     91400   21.1700 -109.9400       5.6       322       105        70
IR     2025250     91400   21.1100 -110.0800       4.1       309       108        98
IR     2025250     91400   21.1200 -110.8500       6.4        28       231        96
IR     2025250     91400   21.0700 -110.9900       7.6        37       245        92
IR     2025250     91400   21.0900 -111.0000       7.6        36       245        85
IR     2025250     91400   21.1300 -111.2900       9.9        35       246        94
IR     2025250     91400   21.1400 -111.3500       8.8        32       220        86
IR     2025250     91400   21.0300 -113.5800      10.6       177       232       100
IR     2025250     91400   21.0700 -113.5900      10.9       176       232        99
IR     2025250     91400   20.9800 -113.8000       9.5       159       231       100
IR     2025250     91400   20.9700 -113.9400       9.4       139       233       100
IR     2025250     91400   20.9700 -114.0300       9.0       133       243        99
IR     2025250     91400   21.0100 -114.0700       9.0       134       243        96
IR     2025250     91400   20.9700 -114.2000       9.8       127       257        98
IR     2025250     91400   20.9600 -114.3800      10.7       112       254        82
IR     2025250     91400   21.0200 -114.4400      10.9       109       254        73
IR     2025250     91400   20.9700 -114.5600      11.6       118       254        93
IR     2025250     91400   20.9700 -115.2700      14.5       161       216        97
IR     2025250     91400   20.9700 -115.4800      13.0       158       207        99
IR     2025250     91400   20.9600 -115.5700      12.5       157       205       100
IR     2025250     91400   20.9800 -115.7000      11.9       165       194       100
IR     2025250     91400   20.9800 -116.4000      11.8       159       221       100
IR     2025250     91400   20.9700 -116.6500      11.9       167       199        98
IR     2025250     91400   20.9300 -116.7700      12.6       165       200        99
IR     2025250     91400   20.9000 -116.9500      10.1       162       199       100
IR     2025250     91400   20.9600 -117.0700       8.8       164       199       100
IR     2025250     91400   20.9400 -117.1700       7.3       161       201        99
IR     2025250     91400   20.9500 -117.3000       7.7       169       227       100
IR     2025250     91400   20.8900 -117.4200       6.9       155       227       100
IR     2025250     91400   20.9500 -117.4800       7.4       159       228       100
IR     2025250     91400   20.8800 -117.5500       7.4       147       242        95
IR     2025250     91400   20.8900 -117.9500       4.0       153       164        94
IR     2025250     91400   21.1300 -108.4300       9.1        86       232        88
IR     2025250     91400   21.1400 -108.5300       8.0        85       221        75
IR     2025250     91400   21.0900 -108.7700       4.8        61       216        93
IR     2025250     91400   21.1300 -109.0300       9.0        59       116        62
IR     2025250     91400   21.0800 -109.2000      12.0        24       107        67
IR     2025250     91400   21.0200 -110.8100       9.9        35       226        99
IR     2025250     91400   21.0600 -110.8900       8.3        35       233       100
IR     2025250     91400   20.9500 -112.8700       7.3       172       245        93
IR     2025250     91400   20.9200 -113.0400       9.7       174       227        98
IR     2025250     91400   20.9700 -113.4100      10.1       176       243        97
IR     2025250     91400   20.9700 -113.5700      10.2       175       232       100
IR     2025250     91400   20.8800 -113.6800      10.3       164       233        99
IR     2025250     91400   20.9000 -113.8400       8.8       147       234       100
IR     2025250     91400   20.9200 -113.8600       8.7       143       234        99
IR     2025250     91400   20.9500 -114.0400       9.2       131       246        98
IR     2025250     91400   20.9300 -114.1600       9.5       132       260        92
IR     2025250     91400   20.8600 -114.2200       8.9       138       260        95
IR     2025250     91400   20.9400 -114.3600      10.1       117       254        89
IR     2025250     91400   20.8700 -114.5400      12.4       122       249        90
IR     2025250     91400   20.9300 -114.6200      11.8       122       257        96
IR     2025250     91400   20.8400 -114.9400      12.3       145       236        96
IR     2025250     91400   20.9000 -114.9900      13.2       146       208        99
IR     2025250     91400   20.8700 -115.1600      15.2       149       222        97
IR     2025250     91400   20.8900 -115.2200      14.7       151       210        94
IR     2025250     91400   20.8700 -115.3400      14.8       151       203        97
IR     2025250     91400   20.8800 -115.4900      13.7       157       204       100
IR     2025250     91400   20.8200 -115.6700      12.3       156       202       100
IR     2025250     91400   20.8700 -116.6900      11.8       166       217        99
IR     2025250     91400   20.8200 -116.9000       9.6       169       199        99
IR     2025250     91400   20.8600 -116.9400       9.3       165       199       100
IR     2025250     91400   20.8200 -117.0800       5.1       173       189        92
IR     2025250     91400   20.8500 -117.2300       5.6       163       193        88
IR     2025250     91400   20.8100 -117.2800       5.1       169       183        86
IR     2025250     91400   20.7600 -117.4700       7.1       154       222       100
IR     2025250     91400   20.7800 -117.5100       7.6       150       229        99
IR     2025250     91400   20.7800 -117.6200       8.3       144       251        97
IR     2025250     91400   20.8000 -117.7700       8.3       150       223        97
IR     2025250     91400   20.7700 -117.8600       7.1       153       214        99
IR     2025250     91400   20.7500 -117.9800       4.5       156       204        89
IR     2025250     91400   20.8000 -118.4300       4.2       131       191        98
IR     2025250     91400   20.9900 -109.2500      18.0        15       107        77
IR     2025250     91400   20.8900 -110.4000       4.3       338       238        64
IR     2025250     91400   20.9100 -111.0500      12.2        41       215       100
IR     2025250     91400   20.9300 -111.0700      12.3        39       220        99
IR     2025250     91400   20.9200 -111.2900      10.0        42       220        94
IR     2025250     91400   20.8900 -112.8400       6.8       174       243        97
IR     2025250     91400   20.8600 -112.9600       8.3       178       238        94
IR     2025250     91400   20.8200 -113.1400      10.0       170       211       100
IR     2025250     91400   20.7800 -113.4700       8.6       164       243        99
IR     2025250     91400   20.8600 -113.5500       9.8       172       238       100
IR     2025250     91400   20.7800 -113.6400       8.9       166       238       100
IR     2025250     91400   20.8600 -113.8300       9.4       152       236       100
IR     2025250     91400   20.7600 -114.1300       7.8       138       262        94
IR     2025250     91400   20.7600 -114.2400       7.9       143       264        65
IR     2025250     91400   20.8000 -114.3000       8.8       144       258        82
IR     2025250     91400   20.8200 -114.4100      10.1       134       248        87
IR     2025250     91400   20.8300 -114.5700      13.3       125       248        95
IR     2025250     91400   20.8200 -114.9200      12.3       144       250        96
IR     2025250     91400   20.8000 -115.0600      14.0       146       233        99
IR     2025250     91400   20.8200 -115.0800      14.4       146       230        99
IR     2025250     91400   20.7300 -115.2100      15.6       150       227        99
IR     2025250     91400   20.7900 -115.3100      15.8       150       201        99
IR     2025250     91400   20.7600 -115.4300      15.7       152       205       100
IR     2025250     91400   20.7400 -115.5900      14.5       152       217        98
IR     2025250     91400   20.8000 -115.6700      12.5       156       203        99
IR     2025250     91400   20.7300 -116.6700      10.8       167       233        98
IR     2025250     91400   20.7500 -116.6900      10.9       166       230        98
IR     2025250     91400   20.6800 -116.8800       8.5       173       204        94
IR     2025250     91400   20.7300 -117.1800       4.6       174       180        93
IR     2025250     91400   20.6700 -117.2900       5.7       174       177        98
IR     2025250     91400   20.7500 -117.4000       6.4       158       183        98
IR     2025250     91400   20.7500 -117.4500       6.9       157       204        99
IR     2025250     91400   20.6500 -117.8200       7.8       159       219        98
IR     2025250     91400   20.8500 -108.6400      10.1        96       278        96
IR     2025250     91400   20.8400 -108.9700       6.7        69       195        72
IR     2025250     91400   20.8700 -109.2800      13.4        10       104        82
IR     2025250     91400   20.8000 -110.0400       4.7        64       117        66
IR     2025250     91400   20.7900 -110.2100       6.2        37       181        64
IR     2025250     91400   20.8700 -110.3800       4.9       357       226        74
IR     2025250     91400   20.8700 -110.4100       4.7       340       238        62
IR     2025250     91400   20.8200 -110.5900       7.8        10       220        90
IR     2025250     91400   20.7900 -110.9400      13.5        38       204        94
IR     2025250     91400   20.7900 -111.0100      14.0        39       209        99
IR     2025250     91400   20.7600 -111.1600      14.0        37       308        97
IR     2025250     91400   20.7800 -111.2500      13.6        39       228        91
IR     2025250     91400   20.7400 -112.9000       6.9       178       210        98
IR     2025250     91400   20.7200 -112.9500       6.8       176       219        98
IR     2025250     91400   20.7500 -113.3400       9.1       161       243        97
IR     2025250     91400   20.7000 -113.4900       7.9       159       247       100
IR     2025250     91400   20.7400 -113.7200       9.1       161       241       100
IR     2025250     91400   20.6800 -114.2600       8.3       142       266        64
IR     2025250     91400   20.7200 -114.3700      10.0       152       251        60
IR     2025250     91400   20.6800 -114.9000      11.7       142       264       100
IR     2025250     91400   20.7100 -115.0500      13.2       148       250        99
IR     2025250     91400   20.6400 -115.3900      15.9       148       233       100
IR     2025250     91400   20.6200 -115.4800      15.6       153       238       100
IR     2025250     91400   20.6200 -115.5700      15.1       153       229        99
IR     2025250     91400   20.6000 -116.3000      10.4       167       197        97
IR     2025250     91400   20.6000 -116.7000       9.6       171       224        98
IR     2025250     91400   20.6200 -116.7200       9.6       171       224        97
IR     2025250     91400   20.6400 -116.8500       8.4       174       214        97
IR     2025250     91400   20.6400 -116.9800       7.2       183       191        98
IR     2025250     91400   20.6100 -117.1400       6.3       191       180        94
IR     2025250     91400   20.5700 -117.1700       6.6       194       180        99
IR     2025250     91400   20.6500 -117.3100       6.0       175       177        99
IR     2025250     91400   20.6200 -117.4500       7.2       163       182        99
IR     2025250     91400   20.6200 -117.5200       7.5       156       188        99
IR     2025250     91400   20.5600 -117.7000       7.3       148       208       100
IR     2025250     91400   20.6300 -117.8000       8.1       157       221        97
IR     2025250     91400   20.6300 -117.9500       4.8       172       213        93
IR     2025250     91400   20.7500 -108.4900       7.4        87       223        88
IR     2025250     91400   20.7700 -108.6100       8.8        88       272        98
IR     2025250     91400   20.8100 -108.6700       9.3        90       282        98
IR     2025250     91400   20.8000 -108.9000       7.1        75       251        99
IR     2025250     91400   20.7300 -109.0400       6.3        75       223        80
IR     2025250     91400   20.7300 -109.0700       6.3        76       206        80
IR     2025250     91400   20.7400 -109.4100      11.5         6       104        65
IR     2025250     91400   20.7700 -110.2400       6.3        23       184        63
IR     2025250     91400   20.7200 -110.5200       7.7       345       204        72
IR     2025250     91400   20.7600 -110.6600       8.0        23       200        96
IR     2025250     91400   20.6700 -110.8500       9.3        39       204        98
IR     2025250     91400   20.6700 -110.9500      10.8        37       322        97
IR     2025250     91400   20.6600 -111.0400      11.7        36       326        99
IR     2025250     91400   20.7400 -111.1400      13.4        37       321        97
IR     2025250     91400   20.7400 -111.2200      13.2        38       290        96
IR     2025250     91400   20.6500 -111.4100       5.0        69       214        95
IR     2025250     91400   20.6700 -113.2400       8.6       161       229        98
IR     2025250     91400   20.6600 -113.4500       7.7       155       246        99
IR     2025250     91400   20.6600 -113.5300       7.9       157       248       100
IR     2025250     91400   20.5700 -113.7100       8.7       157       263       100
IR     2025250     91400   20.6500 -113.7100       8.9       160       253       100
IR     2025250     91400   20.6400 -114.2500       8.3       139       267        64
IR     2025250     91400   20.5400 -114.8400      13.3       140       269        99
IR     2025250     91400   20.5300 -114.9800      13.5       151       266       100
IR     2025250     91400   20.5500 -115.0200      14.0       157       264        99
IR     2025250     91400   20.5100 -115.6400      14.8       156       219       100
IR     2025250     91400   20.5200 -116.1600      12.5       165       201        98
IR     2025250     91400   20.5000 -116.1800      12.0       164       199        99
IR     2025250     91400   20.5100 -116.3800      10.6       169       198        92
IR     2025250     91400   20.4900 -116.4300      10.5       167       197        94
IR     2025250     91400   20.5600 -116.7100       9.2       172       221        98
IR     2025250     91400   20.4800 -116.9000       7.4       184       207        90
IR     2025250     91400   20.4700 -116.9900       6.8       185       206        96
IR     2025250     91400   20.5500 -117.1300       7.0       197       186        96
IR     2025250     91400   20.5500 -117.1500       6.9       196       185        97
IR     2025250     91400   20.5000 -117.3600       6.3       182       182        99
IR     2025250     91400   20.5000 -117.3800       6.3       180       183        99
IR     2025250     91400   20.5000 -117.5600       6.3       154       194        98
IR     2025250     91400   20.5100 -117.6900       6.3       142       199        99
IR     2025250     91400   20.5300 -117.7100       6.8       146       203        99
IR     2025250     91400   20.5100 -118.5500       4.0        21       180        90
IR     2025250     91400   20.4300 -118.6000       4.5         4       174        94
IR     2025250     91400   20.6800 -108.1800       5.5        86       215        97
IR     2025250     91400   20.7300 -108.5000       6.7        84       222        90
IR     2025250     91400   20.6500 -108.6000       5.6        67       241        97
IR     2025250     91400   20.6800 -108.7400       7.4        78       275       100
IR     2025250     91400   20.7200 -108.9300       6.4        73       253        98
IR     2025250     91400   20.7100 -109.0500       6.0        77       231        98
IR     2025250     91400   20.6900 -109.1800       6.0        74       169        84
IR     2025250     91400   20.6700 -109.2100       6.0        68       163        86
IR     2025250     91400   20.6200 -109.3500       6.5        52       127        74
IR     2025250     91400   20.6700 -109.5600       7.9        21       104        81
IR     2025250     91400   20.5800 -110.3600      11.4       343       175        96
IR     2025250     91400   20.5800 -110.4600       9.7       345       188        64
IR     2025250     91400   20.5700 -110.6800       9.8        47       346        99
IR     2025250     91400   20.6300 -110.7900      10.0        47       329        95
IR     2025250     91400   20.6500 -110.9000      10.2        39       316        99
IR     2025250     91400   20.6500 -110.9300      10.8        39       334        99
IR     2025250     91400   20.6400 -111.0500      11.6        36       332        99
IR     2025250     91400   20.5300 -112.4300       7.9       147       167       100
IR     2025250     91400   20.4900 -113.2200       7.4       159       241       100
IR     2025250     91400   20.5500 -113.2300       7.4       161       234       100
IR     2025250     91400   20.5000 -113.4500       8.8       158       245       100
IR     2025250     91400   20.4800 -113.5200       9.6       159       245       100
IR     2025250     91400   20.4900 -113.6800       9.4       157       267        99
IR     2025250     91400   20.5300 -113.6900       8.9       156       266        99
IR     2025250     91400   20.4900 -114.2800      10.5       123       275        96
IR     2025250     91400   20.4700 -114.9900      13.8       148       265        99
IR     2025250     91400   20.4300 -115.1800      13.9       149       256        92
IR     2025250     91400   20.4400 -115.2200      14.3       150       259        97
IR     2025250     91400   20.4800 -115.4000      14.4       150       257       100
IR     2025250     91400   20.4900 -115.6400      14.7       156       200       100
IR     2025250     91400   20.4500 -115.8300      13.6       155       184       100
IR     2025250     91400   20.4200 -115.9500      12.3       156       176        99
IR     2025250     91400   20.4600 -115.9700      13.0       158       189       100
IR     2025250     91400   20.4800 -116.0700      12.6       159       195        99
IR     2025250     91400   20.4000 -116.2000       9.7       167       189        99
IR     2025250     91400   20.3900 -116.4100       9.0       178       197        82
IR     2025250     91400   20.4700 -116.4300      10.6       169       196        94
IR     2025250     91400   20.4600 -116.6100       9.2       168       200        92
IR     2025250     91400   20.4000 -116.7200       8.0       173       196        94
IR     2025250     91400   20.4200 -116.7800       7.4       175       203        91
IR     2025250     91400   20.4600 -116.8800       7.4       185       207        92
IR     2025250     91400   20.3700 -117.0500       6.9       171       208        94
IR     2025250     91400   20.4100 -117.1400       6.1       189       206        99
IR     2025250     91400   20.3600 -117.5000       4.2       159       196        95
IR     2025250     91400   20.4200 -117.5800       5.7       150       195        95
IR     2025250     91400   20.4300 -117.7100       5.7       132       193        89
IR     2025250     91400   20.4100 -118.6100       4.5         5       172        95
IR     2025250     91400   20.3700 -118.7000       4.2        14       173        86
IR     2025250     91400   20.3200 -118.8400       4.2         1       182        83
IR     2025250     91400   20.3200 -118.8600       4.4       358       182        82
IR     2025250     91400   20.6000 -108.1600       5.6        65       217        95
IR     2025250     91400   20.5600 -108.3000       5.1        66       216        99
IR     2025250     91400   20.5500 -108.5000       4.2        64       217        85
IR     2025250     91400   20.5900 -108.5600       4.8        61       231        99
IR     2025250     91400   20.5200 -109.1800       4.5        40       233        83
IR     2025250     91400   20.6000 -109.2500       6.0        63       171        92
IR     2025250     91400   20.5100 -109.4500       4.7        55       163        71
IR     2025250     91400   20.5100 -109.5500       4.6        59       157        68
IR     2025250     91400   20.5100 -109.6500       5.5        53       156        73
IR     2025250     91400   20.5200 -109.7200       5.1        33       141        80
IR     2025250     91400   20.5000 -109.9200       4.7        13       175        69
IR     2025250     91400   20.5600 -110.3400      11.9       340       174        87
IR     2025250     91400   20.5600 -110.5600       7.9        27       342        63
IR     2025250     91400   20.5500 -110.6900       9.7        52       351        99
IR     2025250     91400   20.5400 -110.9100      10.3        50       341        98
IR     2025250     91400   20.5400 -110.9300      10.6        47       345        98
IR     2025250     91400   20.5000 -111.0900      11.4        37       283        93
IR     2025250     91400   20.4700 -111.2400       5.8        43       211        98
IR     2025250     91400   20.5100 -111.3200       4.8        64       211        99
IR     2025250     91400   20.4500 -112.5200       7.7       154       165        99
IR     2025250     91400   20.4300 -113.1800       7.8       153       241        99
IR     2025250     91400   20.3800 -113.2900       8.8       153       221       100
IR     2025250     91400   20.4000 -113.4200       9.7       156       233       100
IR     2025250     91400   20.4200 -113.5600      10.1       162       244       100
IR     2025250     91400   20.4300 -113.5800      10.0       162       248        99
IR     2025250     91400   20.4500 -113.6900      10.0       158       262       100
IR     2025250     91400   20.4400 -114.0400       7.6       151       258        71
IR     2025250     91400   20.4200 -114.2000       8.8       135       265        81
IR     2025250     91400   20.4100 -114.3400      10.1       132       298       100
IR     2025250     91400   20.3900 -114.4400      11.2       136       312        98
IR     2025250     91400   20.3300 -114.9500      13.6       145       270        94
IR     2025250     91400   20.3300 -115.0700      12.8       149       253        83
IR     2025250     91400   20.4100 -115.1600      13.6       149       254        89
IR     2025250     91400   20.3600 -115.2600      13.8       151       256        98
IR     2025250     91400   20.3600 -115.8500      13.2       157       181        96
IR     2025250     91400   20.3400 -115.8800      12.6       158       176        94
IR     2025250     91400   20.3800 -115.9800      11.5       160       161        97
IR     2025250     91400   20.3800 -116.1800       9.7       167       175        98
IR     2025250     91400   20.3100 -116.2600       9.5       175       197       100
IR     2025250     91400   20.3000 -116.6200       7.8       174       193        81
IR     2025250     91400   20.2800 -116.7400       7.9       169       189        88
IR     2025250     91400   20.3200 -116.7800       7.4       171       191        85
IR     2025250     91400   20.2700 -116.8700       7.7       163       187        84
IR     2025250     91400   20.2700 -117.0100       8.8       162       203        98
IR     2025250     91400   20.3100 -117.0900       8.1       166       207        98
IR     2025250     91400   20.3100 -117.6200       4.2       131       195        98
IR     2025250     91400   20.3300 -117.6400       4.6       135       195        96
IR     2025250     91400   20.3300 -117.7500       4.1       119       195        80
IR     2025250     91400   20.2600 -118.1800       4.4       314       193        96
IR     2025250     91400   20.3000 -118.8400       4.2         1       181        86
IR     2025250     91400   20.4500 -108.4300       4.8        43       214        87
IR     2025250     91400   20.5000 -109.1600       4.4        34       236        82
IR     2025250     91400   20.4200 -109.2100       5.0        22       240        89
IR     2025250     91400   20.4400 -109.3500       5.2        45       227        96
IR     2025250     91400   20.4700 -109.5100       4.7        55       173        76
IR     2025250     91400   20.4900 -109.6300       5.9        58       172        78
IR     2025250     91400   20.4600 -109.7900       6.8        37       186        84
IR     2025250     91400   20.4000 -109.9000       6.6        42       190        88
IR     2025250     91400   20.4300 -110.0100       4.7       357       178        74
IR     2025250     91400   20.4200 -110.2600       8.2       341       175        84
IR     2025250     91400   20.4600 -110.3900      12.0       343       175        73
IR     2025250     91400   20.4300 -110.5200       8.8        29       347        73
IR     2025250     91400   20.3900 -110.6100      10.0        55       352        80
IR     2025250     91400   20.4100 -110.7700      10.6        51       354       100
IR     2025250     91400   20.4400 -110.8300      11.8        52       353        97
IR     2025250     91400   20.3600 -111.0200      10.0        35       209        95
IR     2025250     91400   20.3500 -111.1200       8.1        37       208        97
IR     2025250     91400   20.3300 -112.4100       6.1       142       163       100
IR     2025250     91400   20.3500 -112.4300       6.5       145       164       100
IR     2025250     91400   20.3900 -112.5400       7.1       153       164        97
IR     2025250     91400   20.3000 -112.7500       6.4       151       163        94
IR     2025250     91400   20.2800 -113.2600       9.0       147       199        99
IR     2025250     91400   20.3600 -113.4100      10.0       154       223       100
IR     2025250     91400   20.3000 -113.4700      10.9       152       219        99
IR     2025250     91400   20.3500 -113.5700      10.4       158       232        98
IR     2025250     91400   20.2700 -113.8000       8.3       161       210        98
IR     2025250     91400   20.3300 -114.4100      10.2       138       305        99
IR     2025250     91400   20.2800 -114.5100      10.5       146       313        96
IR     2025250     91400   20.2500 -114.8300      12.4       150       292       100
IR     2025250     91400   20.2900 -114.9600      13.3       144       268        87
IR     2025250     91400   20.2700 -115.0300      12.6       146       256        78
IR     2025250     91400   20.2400 -115.1800      11.1       147       245        71
IR     2025250     91400   20.2200 -115.3600      12.8       153       226        97
IR     2025250     91400   20.2500 -115.6500      13.9       158       194       100
IR     2025250     91400   20.2900 -115.7300      13.0       158       190       100
IR     2025250     91400   20.2600 -115.8900      10.8       161       169        95
IR     2025250     91400   20.2800 -115.9100      10.9       161       167        95
IR     2025250     91400   20.2200 -116.0600       9.9       174       147        98
IR     2025250     91400   20.1900 -116.2400       9.3       176       152       100
IR     2025250     91400   20.2300 -116.2800       9.7       177       189       100
IR     2025250     91400   20.2600 -116.5900       8.4       181       193        88
IR     2025250     91400   20.2600 -116.7200       8.2       169       189        89
IR     2025250     91400   20.2500 -116.8800       7.6       162       186        88
IR     2025250     91400   20.2500 -116.9400       8.7       162       190        89
IR     2025250     91400   20.1700 -117.0500       7.1       160       200        98
IR     2025250     91400   20.1600 -117.2000       5.8       175       205        98
IR     2025250     91400   20.2200 -117.2800       4.3       188       201        97
IR     2025250     91400   20.2200 -118.0300       5.9       335       207        65
IR     2025250     91400   20.2000 -118.1900       4.6       315       191        96
IR     2025250     91400   20.1400 -118.8900       4.0        15       179        81
IR     2025250     91400   20.4000 -109.2400       5.0        25       240        94
IR     2025250     91400   20.3100 -109.4600       5.4        49       236        98
IR     2025250     91400   20.3300 -109.4800       5.5        53       235        98
IR     2025250     91400   20.3900 -109.6100       7.3        56       235        96
IR     2025250     91400   20.3000 -109.8000       9.2        60       238        96
IR     2025250     91400   20.3600 -109.8400       8.1        53       223        97
IR     2025250     91400   20.3300 -109.9700       4.6        51       187        98
IR     2025250     91400   20.3600 -110.3500       7.8         4       176        64
IR     2025250     91400   20.3500 -110.5200       8.9        44       339        63
IR     2025250     91400   20.2700 -110.6400       7.1        41       332        97
IR     2025250     91400   20.3300 -110.6700       8.4        44       348        87
IR     2025250     91400   20.2800 -110.8000       6.4        34       351        97
IR     2025250     91400   20.3200 -111.0100       8.5        30       215        96
IR     2025250     91400   20.2500 -111.1500       4.2        35       213        99
IR     2025250     91400   20.2200 -112.1300       4.1       136       164        83
IR     2025250     91400   20.2900 -112.4900       5.9       143       162        99
IR     2025250     91400   20.2200 -112.6200       5.3       140       163        95
IR     2025250     91400   20.2800 -112.7700       6.3       149       162        96
IR     2025250     91400   20.1900 -112.9100       7.1       139       160        90
IR     2025250     91400   20.2500 -113.0100       7.4       149       162        97
IR     2025250     91400   20.2600 -113.2900       9.1       147       193        98
IR     2025250     91400   20.2600 -113.3600       9.5       149       197        99
IR     2025250     91400   20.2500 -113.5500      10.6       152       216        99
IR     2025250     91400   20.2300 -113.6200      10.0       152       207        88
IR     2025250     91400   20.2500 -113.7800       8.5       157       204        97
IR     2025250     91400   20.1800 -113.9100       7.0       168       159        93
IR     2025250     91400   20.1900 -114.3200       9.9       151       250       100
IR     2025250     91400   20.1800 -114.5100      11.6       150       283        99
IR     2025250     91400   20.1800 -114.5300      11.7       150       286        99
IR     2025250     91400   20.1500 -114.7400      13.1       146       288       100
IR     2025250     91400   20.2000 -115.1600      10.3       147       243        71
IR     2025250     91400   20.2000 -115.3700      12.6       153       225        97
IR     2025250     91400   20.1500 -115.4200      13.3       153       221        99
IR     2025250     91400   20.1200 -115.7600      10.7       159       190        98
IR     2025250     91400   20.1200 -115.9200       9.3       168       169        98
IR     2025250     91400   20.1400 -115.9400       9.3       171       165        97
IR     2025250     91400   20.1500 -116.1400      10.0       181       145        99
IR     2025250     91400   20.1700 -116.2500       9.3       177       151       100
IR     2025250     91400   20.0900 -116.3100      10.4       176       179       100
IR     2025250     91400   20.0800 -116.6700       7.3       180       189        90
IR     2025250     91400   20.1400 -116.7200       7.8       173       186        95
IR     2025250     91400   20.1500 -116.8500       7.2       166       185        94
IR     2025250     91400   20.0900 -117.0200       5.6       161       193        96
IR     2025250     91400   20.1100 -117.0400       5.7       159       194        96
IR     2025250     91400   20.1400 -117.2300       4.9       180       205        95
IR     2025250     91400   20.1200 -117.2600       4.1       187       205        92
IR     2025250     91400   20.1000 -118.0300       5.1       342       195        82
IR     2025250     91400   20.1000 -118.9200       4.7        14       179        80
IR     2025250     91400   20.0200 -118.9800       6.4         5       180        89
IR     2025250     91400   20.2700 -108.7700       4.3        36       230        92
IR     2025250     91400   20.2500 -108.8800       5.1        35       262        99
IR     2025250     91400   20.2700 -108.9300       5.4        31       274        96
IR     2025250     91400   20.2600 -109.1500       4.9        18       273        88
IR     2025250     91400   20.2200 -109.2100       4.7        26       266        98
IR     2025250     91400   20.2100 -109.4100       5.9        36       204        87
IR     2025250     91400   20.2900 -109.4400       5.7        44       233        99
IR     2025250     91400   20.2400 -109.6200       9.7        52       247       100
IR     2025250     91400   20.2000 -109.7800      11.2        56       205        97
IR     2025250     91400   20.2300 -109.8900       9.0        60       187       100
IR     2025250     91400   20.2500 -109.9100       8.0        60       186        98
IR     2025250     91400   20.2100 -110.5100       6.1        31       195       100
IR     2025250     91400   20.1700 -110.5400       4.7        32       201        96
IR     2025250     91400   20.1600 -110.7400       5.3        22       337        99
IR     2025250     91400   20.1600 -110.8800       4.1        22       341        99
IR     2025250     91400   20.2000 -110.9000       5.3        18       343       100
IR     2025250     91400   20.2300 -111.1000       4.3        26       217        97
IR     2025250     91400   20.1500 -112.4500       4.8       119       162        98
IR     2025250     91400   20.1600 -112.6100       5.2       134       163        98
IR     2025250     91400   20.0900 -112.9100       7.3       137       153        93
IR     2025250     91400   20.1500 -113.0400       7.9       136       152        88
IR     2025250     91400   20.1200 -113.1600       8.2       129       151        90
IR     2025250     91400   20.1200 -113.2300       8.7       127       148        85
IR     2025250     91400   20.1600 -113.4100      11.9       122       153        77
IR     2025250     91400   20.1300 -113.7100       9.3       131       138        89
IR     2025250     91400   20.0600 -113.9100       4.7       152       128        74
IR     2025250     91400   20.1100 -114.3600       9.3       152       213        93
IR     2025250     91400   20.1000 -114.3900       8.9       155       219        94
IR     2025250     91400   20.0700 -114.7300      12.2       147       273       100
IR     2025250     91400   20.0400 -115.2600      11.0       156       235        98
IR     2025250     91400   20.0100 -115.3600      11.7       154       225       100
IR     2025250     91400   20.0000 -115.9700       7.2       159       154        98
IR     2025250     91400   20.0000 -115.9900       7.3       161       152        99
IR     2025250     91400   20.0700 -116.1100       9.5       177       144       100
IR     2025250     91400   20.0700 -116.2900      10.1       174       168       100
IR     2025250     91400   20.0700 -116.3100      10.3       174       181       100
IR     2025250     91400   19.9800 -116.4900       8.2       173       197        86
IR     2025250     91400   19.9800 -116.5500       7.7       171       190        88
IR     2025250     91400   20.0000 -116.7000       5.8       172       183        88
IR     2025250     91400   20.0100 -116.7700       6.3       170       185        98
IR     2025250     91400   19.9700 -116.9300       6.4       168       192       100
IR     2025250     91400   20.0500 -117.0700       4.1       166       201        92
IR     2025250     91400   19.9200 -118.7400       5.7       360       181        99
IR     2025250     91400   19.9800 -118.8800       6.3         7       183        99
IR     2025250     91400   19.9900 -118.9800       6.7         4       180        89
IR     2025250     91400   20.1900 -108.9200       5.4        40       257       100
IR     2025250     91400   20.1600 -108.9500       5.4        39       257       100
IR     2025250     91400   20.2000 -109.1700       4.3        20       268        91
IR     2025250     91400   20.1900 -109.2200       4.5        27       261        99
IR     2025250     91400   20.1900 -109.4200       5.8        38       202        83
IR     2025250     91400   20.1800 -109.5400       8.0        50       209        99
IR     2025250     91400   20.0900 -109.8300       9.0        62       185        91
IR     2025250     91400   20.1700 -109.9100       8.3        62       183        97
IR     2025250     91400   20.1000 -111.8700       5.4       105       180        99
IR     2025250     91400   20.0000 -112.4200       5.4       134       162       100
IR     2025250     91400   20.0000 -112.5100       7.0       136       165       100
IR     2025250     91400   20.0000 -112.5800       7.3       140       165        99
IR     2025250     91400   20.0300 -112.7400       7.3       135       160        96
IR     2025250     91400   20.0500 -112.8700       6.7       140       153        92
IR     2025250     91400   20.0700 -112.8900       6.9       138       152        92
IR     2025250     91400   20.0700 -113.0300       7.2       129       137        85
IR     2025250     91400   20.0200 -113.2100       7.0       115       130        76
IR     2025250     91400   20.0600 -113.2400       7.4       120       133        83
IR     2025250     91400   19.9700 -113.4300      10.9       101       119        89
IR     2025250     91400   19.9700 -113.5900      13.4        98       112        99
IR     2025250     91400   19.9700 -113.6100      12.7        97       111       100
IR     2025250     91400   20.0400 -113.7600       8.5       115       123        86
IR     2025250     91400   20.0400 -113.8700       5.4       133       124        73
IR     2025250     91400   20.0400 -113.9400       4.5       172       126        63
IR     2025250     91400   19.9400 -114.4000       5.3       178       144        83
IR     2025250     91400   20.0200 -114.4900       9.2       150       207       100
IR     2025250     91400   20.0000 -114.5200      10.1       146       193        99
IR     2025250     91400   19.9300 -114.7400      10.2       148       248       100
IR     2025250     91400   19.9300 -114.7600      10.6       147       256       100
IR     2025250     91400   19.9500 -114.9000       9.9       153       285        99
IR     2025250     91400   19.9800 -115.0300       9.5       159       283       100
IR     2025250     91400   19.9800 -115.1800      10.7       162       257       100
IR     2025250     91400   20.0000 -115.2700      11.1       158       239       100
IR     2025250     91400   19.9800 -115.3200      11.3       158       233       100
IR     2025250     91400   19.9100 -115.4500      11.7       155       228       100
IR     2025250     91400   19.9800 -115.7700       7.9       154       182        96
IR     2025250     91400   19.9800 -115.9500       7.0       155       155        97
IR     2025250     91400   19.9800 -115.9700       7.0       157       153        97
IR     2025250     91400   19.8900 -116.1900       7.5       174       149       100
IR     2025250     91400   19.9300 -116.3000       7.8       177       167       100
IR     2025250     91400   19.9500 -116.3600       8.2       173       183        99
IR     2025250     91400   19.9600 -116.4900       7.6       174       195        85
IR     2025250     91400   19.9600 -116.5300       7.2       172       191        82
IR     2025250     91400   19.9400 -116.6700       5.1       172       178        84
IR     2025250     91400   19.8900 -116.8100       5.1       162       180        95
IR     2025250     91400   19.8700 -116.8800       6.2       161       187       100
IR     2025250     91400   19.9300 -116.9800       6.4       165       196        98
IR     2025250     91400   19.9000 -118.6300       4.5       348       174        91
IR     2025250     91400   19.9000 -118.7200       5.7       358       179        97
IR     2025250     91400   19.8200 -118.9300       7.7       360       179       100
IR     2025250     91400   19.8100 -118.9500       7.7       359       179        99
IR     2025250     91400   19.8500 -119.0500       8.2       352       179        94
IR     2025250     91400   20.0100 -109.1900       4.0        38       229        99
IR     2025250     91400   20.0500 -109.7900      10.4        58       199        92
IR     2025250     91400   19.9600 -111.8600       6.6       105       164        98
IR     2025250     91400   20.0000 -111.9200       5.7       109       167       100
IR     2025250     91400   19.9900 -112.2300       4.1       134       153        98
IR     2025250     91400   19.9000 -112.4200       6.1       146       162        98
IR     2025250     91400   19.9400 -112.5700       7.8       141       170       100
IR     2025250     91400   19.8900 -112.7000       8.3       146       163        96
IR     2025250     91400   19.9100 -112.7200       8.1       143       161        95
IR     2025250     91400   19.9500 -112.8300       7.3       137       148        90
IR     2025250     91400   19.9400 -113.0400       4.5       118       131        70
IR     2025250     91400   19.9400 -113.1500       4.0       124       128        70
IR     2025250     91400   19.9600 -113.1700       5.2       113       128        75
IR     2025250     91400   19.9500 -113.3400       7.7       104       121        71
IR     2025250     91400   19.8900 -113.4700       9.8        96       111        92
IR     2025250     91400   19.9500 -113.5900      12.8        96       109        98
IR     2025250     91400   19.8600 -113.6600       8.9        85       105        84
IR     2025250     91400   19.9400 -113.8500       5.7       111       110        81
IR     2025250     91400   19.9000 -113.9000       5.0       116       109        85
IR     2025250     91400   19.9100 -113.9900       4.0       164       114        72
IR     2025250     91400   19.8900 -114.2000       4.9       227       119        87
IR     2025250     91400   19.8500 -114.2600       4.6       244       119        88
IR     2025250     91400   19.9200 -114.4200       5.0       181       141        78
IR     2025250     91400   19.9200 -114.4500       4.9       179       147        80
IR     2025250     91400   19.9200 -114.5900       8.5       147       159        87
IR     2025250     91400   19.9100 -114.7700       9.9       149       248       100
IR     2025250     91400   19.8900 -114.8000       9.6       150       247       100
IR     2025250     91400   19.8200 -115.0100       9.8       164       286        99
IR     2025250     91400   19.8600 -115.0300      10.0       162       288       100
IR     2025250     91400   19.8400 -115.2100      10.3       166       257       100
IR     2025250     91400   19.8700 -115.3000      11.1       163       241       100
IR     2025250     91400   19.8700 -115.3900      11.2       158       230       100
IR     2025250     91400   19.8100 -115.4900       9.9       161       225       100
IR     2025250     91400   19.8800 -115.7900       5.8       156       172        93
IR     2025250     91400   19.8600 -115.9100       5.1       147       148        92
IR     2025250     91400   19.8500 -116.0900       6.8       160       143       100
IR     2025250     91400   19.8100 -116.1600       7.8       166       145        98
IR     2025250     91400   19.8700 -116.3300       7.3       175       178        99
IR     2025250     91400   19.8600 -116.3500       7.1       173       182        98
IR     2025250     91400   19.8600 -116.5500       4.8       179       189        67
IR     2025250     91400   19.7900 -116.8800       4.7       166       187        97
IR     2025250     91400   19.7900 -116.9200       5.2       160       191        98
IR     2025250     91400   19.7600 -117.0600       5.3       159       208        99
IR     2025250     91400   19.8400 -117.1800       4.3       157       210       100
IR     2025250     91400   19.8100 -118.3400       4.0        80       152        97
IR     2025250     91400   19.7200 -118.6200       5.0         9       173        92
IR     2025250     91400   19.7600 -118.6600       5.7         1       173        94
IR     2025250     91400   19.7400 -118.8300       8.0         3       176        99
IR     2025250     91400   19.7100 -118.9400       7.5         5       174        88
IR     2025250     91400   19.7900 -118.9500       7.6         0       179        99
IR     2025250     91400   19.7900 -119.1300       7.7       356       179        78
IR     2025250     91400   19.9300 -108.7700       5.7       121       172        90
IR     2025250     91400   19.9100 -109.2400       5.2        42       202        99
IR     2025250     91400   19.9200 -109.3600       5.4        52       192        87
IR     2025250     91400   19.9700 -109.7400      11.0        52       202        94
IR     2025250     91400   19.9700 -109.8200       9.5        52       201        80
IR     2025250     91400   19.9200 -109.9500       4.3        52       172        80
IR     2025250     91400   19.8400 -111.3900       5.5        87       175        91
IR     2025250     91400   19.8700 -111.6500       7.5       115       161        74
IR     2025250     91400   19.8400 -111.7700       7.5       125       161        95
IR     2025250     91400   19.8800 -112.4000       5.8       147       159        98
IR     2025250     91400   19.8800 -112.4200       6.1       146       162        97
IR     2025250     91400   19.8600 -112.6100       8.6       148       174        98
IR     2025250     91400   19.8300 -112.6900       8.4       149       164        93
IR     2025250     91400   19.8100 -112.7900       8.3       154       139        78
IR     2025250     91400   19.7800 -113.0000       4.2       180       128        66
IR     2025250     91400   19.7800 -113.2100       4.0       171       116        75
IR     2025250     91400   19.7700 -113.3500       5.2       102       107        81
IR     2025250     91400   19.7900 -113.3700       6.0        96       107        86
IR     2025250     91400   19.7900 -113.4900       6.0        85       104        87
IR     2025250     91400   19.8000 -113.7400       4.3        76       104        87
IR     2025250     91400   19.8200 -113.8300       6.0        76       105        95
IR     2025250     91400   19.8200 -114.5800       7.7       155       144        80
IR     2025250     91400   19.7900 -114.7000       7.6       158       159        81
IR     2025250     91400   19.7900 -114.7200       7.2       159       160        86
IR     2025250     91400   19.7900 -114.8600       8.0       161       209        99
IR     2025250     91400   19.8000 -115.0400      10.1       164       286        99
IR     2025250     91400   19.7200 -115.1000      10.6       164       278        98
IR     2025250     91400   19.8000 -115.2200      10.3       166       259        99
IR     2025250     91400   19.7300 -115.3000      10.9       165       243        99
IR     2025250     91400   19.7700 -115.4100      10.5       161       228        99
IR     2025250     91400   19.7300 -115.5300       9.5       165       217        99
IR     2025250     91400   19.7000 -115.8700       4.5       172       144        93
IR     2025250     91400   19.7500 -116.0200       5.9       161       142        98
IR     2025250     91400   19.7700 -116.1500       8.2       167       144        99
IR     2025250     91400   19.7300 -116.2700       8.6       168       154        97
IR     2025250     91400   19.7000 -116.2900       8.1       168       156        99
IR     2025250     91400   19.7000 -116.4100       6.5       173       181       100
IR     2025250     91400   19.6900 -117.4000       4.2       139       211        94
IR     2025250     91400   19.6900 -118.2100       4.8        96       148        99
IR     2025250     91400   19.6700 -118.2400       4.8        98       152        99
IR     2025250     91400   19.6500 -118.3500       4.0        78       170       100
IR     2025250     91400   19.6800 -118.6300       5.2        17       173        91
IR     2025250     91400   19.6600 -118.7600       6.6         9       173        93
IR     2025250     91400   19.6400 -118.8700       7.8        14       173        94
IR     2025250     91400   19.6300 -118.9100       7.9        11       173        78
IR     2025250     91400   19.6100 -119.0700       9.3        11       174        73
IR     2025250     91400   19.9100 -108.5700       4.7        82       167        96
IR     2025250     91400   19.9100 -108.7500       4.9       108       171        60
IR     2025250     91400   19.8500 -109.1400       6.3        31       230       100
IR     2025250     91400   19.8700 -109.1600       5.8        31       230       100
IR     2025250     91400   19.8700 -109.2800       5.8        44       198        99
IR     2025250     91400   19.8600 -109.4000       6.1        48       195        87
IR     2025250     91400   19.8000 -109.5700       8.4        46       197        97
IR     2025250     91400   19.7900 -109.7400      10.0        42       199        99
IR     2025250     91400   19.8300 -109.7800       9.9        48       201        98
IR     2025250     91400   19.8000 -110.0100       5.2        29       200        96
IR     2025250     91400   19.7600 -111.1500       4.9        71       211        96
IR     2025250     91400   19.7400 -111.2700       5.9        82       189        93
IR     2025250     91400   19.7900 -111.4000       6.4        89       175        90
IR     2025250     91400   19.8100 -111.4400       6.0        94       173        86
IR     2025250     91400   19.7500 -111.6500       7.3       106       162        85
IR     2025250     91400   19.8100 -111.6800       7.1       116       161        84
IR     2025250     91400   19.7100 -112.2500       4.6       127       155        91
IR     2025250     91400   19.7600 -112.3500       5.5       148       157        99
IR     2025250     91400   19.7800 -112.4200       5.9       145       162        98
IR     2025250     91400   19.7000 -112.5300       5.7       141       165        98
IR     2025250     91400   19.7700 -112.7000       8.3       155       159        95
IR     2025250     91400   19.7700 -112.7300       8.1       154       153        97
IR     2025250     91400   19.6800 -112.9600       7.1       190       130        66
IR     2025250     91400   19.6800 -112.9800       6.8       191       129        68
IR     2025250     91400   19.7400 -113.0800       4.9       181       122        76
IR     2025250     91400   19.6700 -113.2400       4.2       173       113        86
IR     2025250     91400   19.7500 -113.3600       4.9       106       105        81
IR     2025250     91400   19.7000 -113.6500       5.3        71       103        99
IR     2025250     91400   19.7200 -113.6600       5.0        74       104       100
IR     2025250     91400   19.6800 -114.4100       4.0       181       119        98
IR     2025250     91400   19.6400 -114.4400       4.9       174       122        91
IR     2025250     91400   19.6700 -114.6100       9.5       165       133        99
IR     2025250     91400   19.6900 -114.7500       7.4       163       154        91
IR     2025250     91400   19.6900 -114.8400       7.4       166       171        96
IR     2025250     91400   19.6800 -114.9300       8.1       167       217        98
IR     2025250     91400   19.6600 -115.0700      10.2       167       273        98
IR     2025250     91400   19.6100 -115.3500      12.2       166       228        96
IR     2025250     91400   19.6300 -115.4400      11.5       165       213        95
IR     2025250     91400   19.6900 -115.5600       8.9       166       211        99
IR     2025250     91400   19.6000 -115.7600       5.6       181       184        97
IR     2025250     91400   19.6200 -115.8200       5.4       182       159        97
IR     2025250     91400   19.6400 -115.8800       5.4       176       146        94
IR     2025250     91400   19.6300 -116.0900       7.6       169       143        99
IR     2025250     91400   19.6500 -116.1000       7.6       167       144        98
IR     2025250     91400   19.6600 -116.3000       7.4       169       152        95
IR     2025250     91400   19.6000 -116.4200       4.9       174       177       100
IR     2025250     91400   19.5300 -118.1300       4.6       112       152        98
IR     2025250     91400   19.5300 -118.1500       5.0       114       154        99
IR     2025250     91400   19.6100 -118.2900       4.4        94       170        99
IR     2025250     91400   19.5200 -118.5700       7.4        21       180        96
IR     2025250     91400   19.5200 -118.7600       8.6        11       170        97
IR     2025250     91400   19.5200 -118.8700       9.2        10       171        95
IR     2025250     91400   19.5500 -118.8800       8.4        12       172        99
IR     2025250     91400   19.5100 -119.0400      10.5        10       172        70
IR     2025250     91400   19.5500 -119.1400      11.9         7       175        78
IR     2025250     91400   19.7500 -108.4900       8.2        95       169        97
IR     2025250     91400   19.7100 -108.9700       5.8        21       178        69
IR     2025250     91400   19.7100 -109.2000       6.4        25       224        99
IR     2025250     91400   19.7100 -109.2200       6.4        21       221        98
IR     2025250     91400   19.7000 -109.4200       5.9        40       199        98
IR     2025250     91400   19.7000 -109.4700       6.1        40       198        96
IR     2025250     91400   19.6900 -109.5900       6.9        43       197        98
IR     2025250     91400   19.7700 -109.7500       9.8        41       199        98
IR     2025250     91400   19.7600 -109.9200       8.0        31       222        95
IR     2025250     91400   19.7600 -109.9900       6.1        22       201        98
IR     2025250     91400   19.7600 -110.0700       4.8        23       199        91
IR     2025250     91400   19.7100 -110.9500       4.8        48       250        93
IR     2025250     91400   19.6400 -111.0300       5.7        50       231        97
IR     2025250     91400   19.6600 -111.1700       6.5        70       213        84
IR     2025250     91400   19.6500 -111.5100       7.4        85       171        84
IR     2025250     91400   19.7100 -111.5700       8.6        98       165        85
IR     2025250     91400   19.6200 -112.2500       5.7       128       156        98
IR     2025250     91400   19.6200 -112.3200       6.2       126       160        97
IR     2025250     91400   19.6800 -112.4200       5.2       138       162        99
IR     2025250     91400   19.6800 -112.4900       5.4       137       163        97
IR     2025250     91400   19.6500 -112.6800       5.3       163       156        93
IR     2025250     91400   19.6700 -112.7300       5.9       165       151        93
IR     2025250     91400   19.6400 -112.9400       7.4       188       133        73
IR     2025250     91400   19.6600 -112.9600       7.2       190       131        70
IR     2025250     91400   19.5800 -113.1400       5.1       178       117        96
IR     2025250     91400   19.6000 -114.4500       4.8       174       123        91
IR     2025250     91400   19.5300 -114.6200      10.9       162       136        93
IR     2025250     91400   19.6100 -114.6900      10.1       159       141        96
IR     2025250     91400   19.5300 -114.7800       8.1       155       162        98
IR     2025250     91400   19.5400 -114.9600       7.6       166       189        99
IR     2025250     91400   19.5900 -115.3800      12.4       165       217        95
IR     2025250     91400   19.5900 -115.4900      11.6       165       208        92
IR     2025250     91400   19.5600 -115.6700       6.9       172       199        99
IR     2025250     91400   19.5800 -115.8000       5.6       184       166        97
IR     2025250     91400   19.5800 -115.8300       5.6       182       160        97
IR     2025250     91400   19.4900 -115.9600       7.6       176       152        98
IR     2025250     91400   19.4900 -116.0700       8.1       174       149       100
IR     2025250     91400   19.5500 -116.2400       7.1       174       144        99
IR     2025250     91400   19.4800 -116.3800       4.1       169       147        98
IR     2025250     91400   19.5400 -116.5700       4.1       193       179        91
IR     2025250     91400   19.5600 -116.6100       4.1       195       180        81
IR     2025250     91400   19.4400 -117.7500       4.6        76       184        75
IR     2025250     91400   19.5200 -117.8000       4.2        50       161        69
IR     2025250     91400   19.4500 -118.1200       4.7       106       162        97
IR     2025250     91400   19.4700 -118.1400       5.0       111       162        99
IR     2025250     91400   19.4500 -118.4500       5.1        49       191        85
IR     2025250     91400   19.4600 -118.5800       9.0        26       184        93
IR     2025250     91400   19.5000 -118.7400       9.2        12       171        99
IR     2025250     91400   19.5000 -118.8500       9.6        10       170        93
IR     2025250     91400   19.4300 -118.9700      12.0         8       170        89
IR     2025250     91400   19.4900 -119.0500      11.1         9       173        70
IR     2025250     91400   19.4500 -119.1000      13.8         4       177        87
IR     2025250     91400   19.7100 -108.4800       8.4        93       169        95
IR     2025250     91400   19.6400 -108.6500       6.5        82       167        82
IR     2025250     91400   19.6200 -108.7800       5.6        55       167        87
IR     2025250     91400   19.6900 -108.9600       5.9        23       176        65
IR     2025250     91400   19.6100 -109.0800       8.8        12       186        80
IR     2025250     91400   19.6900 -109.2000       6.4        25       220       100
IR     2025250     91400   19.6600 -109.2300       6.2        21       218        98
IR     2025250     91400   19.6000 -109.4000       5.1        32       211        99
IR     2025250     91400   19.6100 -109.4900       5.9        35       197        96
IR     2025250     91400   19.6100 -109.6400       6.3        37       197        91
IR     2025250     91400   19.6600 -109.8200       8.4        44       198       100
IR     2025250     91400   19.6600 -109.8500       8.5        44       198        99
IR     2025250     91400   19.5800 -109.9900       4.8        66       197        94
IR     2025250     91400   19.5600 -110.4000       4.7        45       193        80
IR     2025250     91400   19.5800 -110.5700       4.2        45       248        99
IR     2025250     91400   19.6000 -110.9900       5.8        50       231        97
IR     2025250     91400   19.5800 -111.1200       6.0        63       211        88
IR     2025250     91400   19.5300 -111.3900       5.3        66       183        80
IR     2025250     91400   19.5500 -111.5100       6.1        73       173        81
IR     2025250     91400   19.5400 -111.6300       7.4        70       164        94
IR     2025250     91400   19.5600 -111.8400       4.7        74       163        95
IR     2025250     91400   19.5300 -112.1700       5.2       132       161        88
IR     2025250     91400   19.5400 -112.2900       6.8       132       163        99
IR     2025250     91400   19.4900 -112.5600       4.2       136       160        97
IR     2025250     91400   19.5700 -112.6800       4.1       168       155        88
IR     2025250     91400   19.5500 -112.7800       4.3       180       146        94
IR     2025250     91400   19.5600 -112.9100       6.3       183       136        88
IR     2025250     91400   19.4700 -114.1300       6.4       170       110        84
IR     2025250     91400   19.4400 -114.3200       4.0       175       114       100
IR     2025250     91400   19.5200 -114.4400       4.5       173       123        80
IR     2025250     91400   19.4900 -114.6500      10.5       162       139        93
IR     2025250     91400   19.4700 -114.7700       8.5       156       163        99
IR     2025250     91400   19.5100 -114.7800       8.0       155       165        98
IR     2025250     91400   19.4700 -115.3300      13.2       166       229        96
IR     2025250     91400   19.4300 -115.4300      13.0       161       204        96
IR     2025250     91400   19.4200 -115.5700      10.9       162       202        98
IR     2025250     91400   19.4200 -115.7500       7.5       177       195        99
IR     2025250     91400   19.3900 -115.8600       7.0       175       170       100
IR     2025250     91400   19.4100 -115.8800       7.0       174       165        99
IR     2025250     91400   19.4500 -116.0500       7.4       171       151        99
IR     2025250     91400   19.4100 -116.1100       6.3       165       150       100
IR     2025250     91400   19.4500 -116.2100       6.0       169       148       100
IR     2025250     91400   19.3700 -116.7100       4.1       209       188        81
IR     2025250     91400   19.4000 -117.7400       4.3        84       188        81
IR     2025250     91400   19.3400 -117.9500       4.6        77       168        86
IR     2025250     91400   19.3400 -117.9900       4.5        73       168        86
IR     2025250     91400   19.3300 -118.0800       4.3        54       168        71
IR     2025250     91400   19.3700 -118.3800       4.1        68       195        95
IR     2025250     91400   19.3800 -118.5000       6.8        34       194        81
IR     2025250     91400   19.4000 -118.5900       9.8        27       186        95
IR     2025250     91400   19.3200 -118.7900      10.4        16       166       100
IR     2025250     91400   19.3800 -118.8100      10.6        15       165        99
IR     2025250     91400   19.3900 -119.0000      12.6         7       168        92
IR     2025250     91400   19.3500 -119.0300      12.5         8       166        88
IR     2025250     91400   19.3500 -119.1800      15.6         6       195        96
IR     2025250     91400   19.6000 -108.6600       7.1        83       166        89
IR     2025250     91400   19.6000 -108.7600       5.9        71       166        98
IR     2025250     91400   19.5900 -108.9800       7.0        28       175        95
IR     2025250     91400   19.5900 -109.1100       7.7        15       197        96
IR     2025250     91400   19.5600 -109.3600       4.9        22       222       100
IR     2025250     91400   19.4900 -109.5000       4.9        31       196        87
IR     2025250     91400   19.5400 -110.4100       5.1        48       192        67
IR     2025250     91400   19.5000 -110.5400       6.0        53       247        79
IR     2025250     91400   19.4800 -110.5700       6.0        57       241        81
IR     2025250     91400   19.5100 -110.7800       4.0        60       245        79
IR     2025250     91400   19.4400 -111.0100       4.9        61       170        87
IR     2025250     91400   19.4600 -111.0500       5.1        58       181        86
IR     2025250     91400   19.4600 -111.2200       5.7        64       182        82
IR     2025250     91400   19.4700 -111.3800       5.0        52       181        71
IR     2025250     91400   19.4700 -111.4100       5.0        54       179        76
IR     2025250     91400   19.4800 -111.6200       7.4        58       163        81
IR     2025250     91400   19.4400 -111.6500       7.7        51       162        89
IR     2025250     91400   19.4600 -111.8600       5.9        77       160        85
IR     2025250     91400   19.4700 -111.8800       5.4        79       160        86
IR     2025250     91400   19.4100 -112.1100       6.1       114       161        97
IR     2025250     91400   19.4900 -112.1100       5.1       122       161        91
IR     2025250     91400   19.4000 -112.3400       6.3       132       166       100
IR     2025250     91400   19.4600 -112.8900       4.4       178       140        82
IR     2025250     91400   19.4000 -113.0200       4.9       173       129        81
IR     2025250     91400   19.4200 -113.0400       4.5       173       126        80
IR     2025250     91400   19.3400 -114.1600       6.6       166       113        78
IR     2025250     91400   19.3800 -114.3100       6.0       178       117        97
IR     2025250     91400   19.4000 -114.3500       5.2       176       120        96
IR     2025250     91400   19.3900 -114.5100       7.7       175       133        94
IR     2025250     91400   19.3500 -114.6800       8.7       162       153        85
IR     2025250     91400   19.3300 -114.7300       8.3       161       164        93
IR     2025250     91400   19.4000 -115.0300       8.4       169       221       100
IR     2025250     91400   19.3300 -115.1800       9.3       171       255        99
IR     2025250     91400   19.3300 -115.4500      11.0       160       201        96
IR     2025250     91400   19.3600 -115.5800      10.4       161       200        99
IR     2025250     91400   19.3800 -115.7500       7.5       177       195       100
IR     2025250     91400   19.3400 -115.7800       7.2       176       190       100
IR     2025250     91400   19.2900 -115.9500       5.6       167       165        98
IR     2025250     91400   19.2900 -116.1100       5.2       147       151        98
IR     2025250     91400   19.3100 -116.1700       5.3       148       149        99
IR     2025250     91400   19.3200 -116.3200       4.1       165       153        99
IR     2025250     91400   19.2900 -116.8800       4.3       168       191       100
IR     2025250     91400   19.3000 -117.0500       4.1       150       189       100
IR     2025250     91400   19.2600 -117.8500       4.1       103       198        91
IR     2025250     91400   19.2700 -118.1500       4.3        49       173        90
IR     2025250     91400   19.2700 -118.2600       4.4        63       183        94
IR     2025250     91400   19.2200 -118.4600       4.3        58       203       100
IR     2025250     91400   19.2200 -118.5500       5.7        41       199        94
IR     2025250     91400   19.2300 -118.8700      10.5        19       160        99
IR     2025250     91400   19.2500 -118.8900      10.6        16       159        99
IR     2025250     91400   19.2700 -119.1500      12.4         7       174        99
IR     2025250     91400   19.4800 -108.6900       7.5        88       164        93
IR     2025250     91400   19.5000 -108.8300       6.6        78       164        95
IR     2025250     91400   19.4300 -109.0300       6.2        66       169        96
IR     2025250     91400   19.4900 -109.0600       6.1        41       175        98
IR     2025250     91400   19.3900 -109.4300       4.5        22       196        98
IR     2025250     91400   19.4700 -109.5300       4.8        32       195        83
IR     2025250     91400   19.3600 -110.4300      10.1        88       187        95
IR     2025250     91400   19.3800 -110.5700       8.3        67       186        86
IR     2025250     91400   19.3900 -110.6600       6.7        52       195        91
IR     2025250     91400   19.3900 -110.7600       5.1        50       195       100
IR     2025250     91400   19.4200 -110.9900       4.6        58       162        79
IR     2025250     91400   19.4000 -111.1200       5.0        54       168        85
IR     2025250     91400   19.4100 -111.2500       5.2        65       180        79
IR     2025250     91400   19.3700 -111.4800       4.4        65       162        74
IR     2025250     91400   19.3200 -111.6600       7.2        52       157       100
IR     2025250     91400   19.4000 -111.6600       7.4        51       161        98
IR     2025250     91400   19.4000 -111.8000       6.6        71       159        86
IR     2025250     91400   19.3300 -111.9100       5.3        95       160        97
IR     2025250     91400   19.3900 -112.0900       6.2       114       160        98
IR     2025250     91400   19.3000 -112.2500       6.4       123       168       100
IR     2025250     91400   19.3800 -112.3200       6.3       131       166       100
IR     2025250     91400   19.3400 -112.4000       5.6       132       166       100
IR     2025250     91400   19.2900 -112.5100       4.5       121       164        91
IR     2025250     91400   19.3200 -112.9000       4.2       161       143        79
IR     2025250     91400   19.3200 -113.0400       5.2       171       128        76
IR     2025250     91400   19.3300 -113.9100       8.6       159       110        91
IR     2025250     91400   19.2500 -114.0600       8.8       172       113        99
IR     2025250     91400   19.2500 -114.0900       9.0       175       114        99
IR     2025250     91400   19.2400 -114.2900      10.2       172       128        96
IR     2025250     91400   19.2600 -114.3100       9.5       174       128        99
IR     2025250     91400   19.2300 -114.5200       9.0       174       144        96
IR     2025250     91400   19.2300 -114.6400       8.1       168       151        80
IR     2025250     91400   19.3100 -114.7300       8.3       162       166        93
IR     2025250     91400   19.2900 -114.7600       8.3       163       175        92
IR     2025250     91400   19.2700 -115.1700       9.4       171       250       100
IR     2025250     91400   19.2500 -115.2000       9.4       169       249       100
IR     2025250     91400   19.2500 -115.3100       9.0       165       239       100
IR     2025250     91400   19.2900 -115.4600      10.4       160       201        96
IR     2025250     91400   19.2000 -115.6300       8.4       162       199        99
IR     2025250     91400   19.2000 -115.6500       8.2       163       199       100
IR     2025250     91400   19.2300 -116.0100       5.6       163       160        98
IR     2025250     91400   19.2700 -116.0900       5.1       148       152        97
IR     2025250     91400   19.1800 -116.2400       4.9       136       150        97
IR     2025250     91400   19.1700 -118.1000       4.3        35       174        93
IR     2025250     91400   19.2100 -118.2900       4.6        70       190        86
IR     2025250     91400   19.1900 -118.3800       4.1        84       201        81
IR     2025250     91400   19.2000 -118.5300       4.7        51       202        98
IR     2025250     91400   19.1200 -118.6500       5.4        13       191        99
IR     2025250     91400   19.1200 -118.7000       6.8        13       184       100
IR     2025250     91400   19.1300 -118.8900      10.4        21       161        95
IR     2025250     91400   19.1700 -118.9300      10.3        24       159        94
IR     2025250     91400   19.1500 -119.0600      10.7        25       159       100
IR     2025250     91400   19.1500 -119.2100      10.8        37       163        89
IR     2025250     91400   19.3200 -108.5100       5.4        83       178        99
IR     2025250     91400   19.3600 -108.7000       6.2        90       164        95
IR     2025250     91400   19.3800 -108.7200       6.5        90       164        97
IR     2025250     91400   19.3100 -108.8800       5.9        85       164        85
IR     2025250     91400   19.3300 -109.0500       6.8        81       170        94
IR     2025250     91400   19.3000 -109.2100       6.4        63       179        97
IR     2025250     91400   19.3200 -109.2500       5.9        55       188        97
IR     2025250     91400   19.3700 -109.4300       4.5        22       193        98
IR     2025250     91400   19.2900 -109.4800       4.8        25       191        96
IR     2025250     91400   19.2700 -110.0700       7.8       100       194       100
IR     2025250     91400   19.3000 -110.4700      11.8        92       187       100
IR     2025250     91400   19.2500 -110.6200       9.4        87       187        97
IR     2025250     91400   19.3100 -110.7500       6.2        59       194        99
IR     2025250     91400   19.3100 -110.8500       5.0        51       181        98
IR     2025250     91400   19.2400 -110.9400       5.7        23       173        88
IR     2025250     91400   19.2800 -111.0700       4.1        79       153        80
IR     2025250     91400   19.2300 -111.2500       4.2        96       158        99
IR     2025250     91400   19.2300 -111.2700       4.5       103       157        95
IR     2025250     91400   19.2600 -111.6000       6.1        55       153        95
IR     2025250     91400   19.3000 -111.6600       7.2        53       157       100
IR     2025250     91400   19.2300 -111.8200       7.8        70       159        93
IR     2025250     91400   19.2100 -111.9200       6.6        87       161        87
IR     2025250     91400   19.2100 -112.0800       6.0       105       164        98
IR     2025250     91400   19.2000 -112.2000       6.1       114       170        99
IR     2025250     91400   19.2400 -112.2900       6.2       119       195       100
IR     2025250     91400   19.2100 -112.4300       5.4       124       201        97
IR     2025250     91400   19.1800 -112.7600       4.3       129       157        88
IR     2025250     91400   19.1700 -113.0900       6.9       174       127        95
IR     2025250     91400   19.2500 -113.1200       5.6       176       120        79
IR     2025250     91400   19.1700 -113.3000       6.3       188       109        96
IR     2025250     91400   19.1600 -113.4200       5.7       164       107        94
IR     2025250     91400   19.1500 -113.7900      13.0       164       112        78
IR     2025250     91400   19.1700 -113.9000      12.5       172       113        92
IR     2025250     91400   19.1700 -113.9200      12.6       167       113       100
IR     2025250     91400   19.1400 -114.1300      10.6       176       117        97
IR     2025250     91400   19.1600 -114.2400      11.5       165       130        98
IR     2025250     91400   19.2200 -114.2700      10.6       170       128        90
IR     2025250     91400   19.2100 -114.4600       9.5       174       143        99
IR     2025250     91400   19.1900 -114.5500       8.9       176       148       100
IR     2025250     91400   19.2100 -114.6900       7.6       167       155        94
IR     2025250     91400   19.2000 -114.8000       8.4       167       180        97
IR     2025250     91400   19.2000 -114.8200       8.7       168       184        98
IR     2025250     91400   19.1700 -115.2300       8.9       168       247       100
IR     2025250     91400   19.1900 -115.3200       8.6       166       241       100
IR     2025250     91400   19.1100 -115.4300       8.4       166       202        95
IR     2025250     91400   19.1800 -115.4800       8.8       162       201        96
IR     2025250     91400   19.1800 -115.6400       8.3       164       199        99
IR     2025250     91400   19.1600 -115.7100       8.0       170       198       100
IR     2025250     91400   19.1700 -115.8400       6.7       175       193        99
IR     2025250     91400   19.1100 -116.0100       5.8       179       164        99
IR     2025250     91400   19.1700 -116.0800       5.1       152       152        92
IR     2025250     91400   19.1500 -116.1800       5.0       145       148        92
IR     2025250     91400   19.0700 -116.8800       4.9       280       192        97
IR     2025250     91400   19.1200 -118.0100       4.0        60       182        99
IR     2025250     91400   19.0800 -118.6400       5.5        18       193        99
IR     2025250     91400   19.0600 -118.7100       8.0        13       181       100
IR     2025250     91400   19.0800 -118.7700       9.9        13       175        98
IR     2025250     91400   19.0900 -118.9000      11.3        20       162        94
IR     2025250     91400   19.0300 -119.0100      12.4        24       163        98
IR     2025250     91400   19.0900 -119.0900      11.5        32       160        99
IR     2025250     91400   19.2800 -108.5200       4.6        73       182        99
IR     2025250     91400   19.2600 -108.6700       4.4        68       170        96
IR     2025250     91400   19.2800 -108.7400       4.9        78       165        89
IR     2025250     91400   19.2500 -108.9200       5.2        79       165        96
IR     2025250     91400   19.2800 -109.2400       6.2        62       187        98
IR     2025250     91400   19.2500 -109.4400       4.8        35       191        97
IR     2025250     91400   19.2100 -109.5000       4.7        28       190        91
IR     2025250     91400   19.2200 -109.9100       6.2       100       192        95
IR     2025250     91400   19.2300 -110.0500       7.9        95       193        99
IR     2025250     91400   19.2500 -110.0700       7.9        97       193        99
IR     2025250     91400   19.1600 -110.2400       9.4        93       187        97
IR     2025250     91400   19.1600 -110.3300      10.6        96       187        96
IR     2025250     91400   19.2300 -110.6300       9.5        89       187        99
IR     2025250     91400   19.2200 -110.8900       6.0        27       184        92
IR     2025250     91400   19.1400 -111.0300       5.6        59       169        99
IR     2025250     91400   19.1400 -111.0600       5.6        61       162        99
IR     2025250     91400   19.1300 -111.2500       5.4        84       157        96
IR     2025250     91400   19.1500 -111.3600       5.2        98       153        88
IR     2025250     91400   19.1700 -111.4100       4.1        99       151        74
IR     2025250     91400   19.2000 -111.6100       6.0        58       148        93
IR     2025250     91400   19.2000 -111.6600       6.6        57       151        87
IR     2025250     91400   19.1100 -111.7700       7.0        67       153        86
IR     2025250     91400   19.1900 -111.9200       6.6        87       162        83
IR     2025250     91400   19.1300 -112.0500       5.7       108       166        99
IR     2025250     91400   19.1800 -112.1800       5.9       113       169        99
IR     2025250     91400   19.1000 -112.2500       5.8       119       180       100
IR     2025250     91400   19.1800 -112.3700       5.4       119       224        97
IR     2025250     91400   19.1300 -112.5700       4.6       114       181        97
IR     2025250     91400   19.0900 -112.6900       5.1       125       162        94
IR     2025250     91400   19.0900 -112.7200       5.3       129       161        96
IR     2025250     91400   19.1400 -112.8200       5.0       142       156        82
IR     2025250     91400   19.1200 -112.9400       6.0       160       144        80
IR     2025250     91400   19.1500 -113.1000       7.0       175       128        96
IR     2025250     91400   19.0700 -113.2100       6.6       179       121        99
IR     2025250     91400   19.1300 -113.2900       6.7       185       112        99
IR     2025250     91400   19.1500 -113.4000       6.5       165       107        91
IR     2025250     91400   19.0800 -113.5700      10.1       153       110        92
IR     2025250     91400   19.0800 -113.6400      11.3       151       111        89
IR     2025250     91400   19.0700 -113.7800      14.3       164       114        93
IR     2025250     91400   19.0900 -113.9600      12.6       171       116       100
IR     2025250     91400   19.0400 -114.0800      11.3       186       122        97
IR     2025250     91400   19.0400 -114.1700      12.2       184       135        99
IR     2025250     91400   19.1000 -114.2100      12.3       175       134        98
IR     2025250     91400   19.0800 -114.3700      13.6       174       148        98
IR     2025250     91400   19.0700 -114.4600      10.8       175       149       100
IR     2025250     91400   19.1100 -114.6400       6.7       181       151        90
IR     2025250     91400   19.0200 -114.7700       5.4       181       161        83
IR     2025250     91400   19.0400 -114.8300       6.1       179       178        84
IR     2025250     91400   19.0300 -115.1500       8.6       176       243       100
IR     2025250     91400   19.0300 -115.2800       8.6       171       240       100
IR     2025250     91400   19.0500 -115.4200       8.6       168       202        95
IR     2025250     91400   19.0900 -115.4300       8.4       167       202        95
IR     2025250     91400   19.0200 -115.6400       7.7       165       198        84
IR     2025250     91400   19.0800 -115.6800       8.5       170       199        96
IR     2025250     91400   19.0400 -115.7700       8.1       176       199        99
IR     2025250     91400   19.0100 -115.9800       5.9       184       183        96
IR     2025250     91400   19.0700 -115.9900       6.1       183       170        99
IR     2025250     91400   19.0300 -116.1300       5.4       166       163        91
IR     2025250     91400   18.9800 -116.2300       4.6       165       164        96
IR     2025250     91400   18.9900 -116.8700       7.7       289       185        99
IR     2025250     91400   19.0500 -116.8800       5.7       286       191        97
IR     2025250     91400   18.9400 -118.0400       4.5        85       205        98
IR     2025250     91400   18.9700 -118.0900       4.6        71       189        99
IR     2025250     91400   18.9200 -118.5600       4.8        22       195        90
IR     2025250     91400   18.9600 -118.6800       7.5        13       179        98
IR     2025250     91400   18.9100 -118.9000      12.4        18       171        97
IR     2025250     91400   19.1600 -108.6300       4.0        40       178       100
IR     2025250     91400   19.1300 -108.9800       4.8        79       171        94
IR     2025250     91400   19.1600 -109.2700       6.6        78       198        97
IR     2025250     91400   19.0900 -109.4300       4.8        59       205        96
IR     2025250     91400   19.1500 -109.5400       4.4        19       192        81
IR     2025250     91400   19.1000 -109.8200       4.5        75       190        99
IR     2025250     91400   19.0900 -109.8900       5.5        84       188        96
IR     2025250     91400   19.1100 -109.9600       6.5        90       171        95
IR     2025250     91400   19.1300 -110.0800       6.9        85       162        88
IR     2025250     91400   19.1200 -110.2700       9.7        94       162        99
IR     2025250     91400   19.1400 -110.3100      10.4        95       181        97
IR     2025250     91400   19.0600 -110.4600      11.8        98       157       100
IR     2025250     91400   19.0500 -110.7000      10.6        99       228        98
IR     2025250     91400   19.0600 -110.8600       6.6        82       243        96
IR     2025250     91400   19.1200 -111.0100       5.7        60       181        98
IR     2025250     91400   19.0600 -111.0800       5.9        48       176        78
IR     2025250     91400   19.1100 -111.2500       5.8        85       158        96
IR     2025250     91400   19.1100 -111.2800       5.9        89       157        92
IR     2025250     91400   19.0200 -111.4400       7.2        95       136        96
IR     2025250     91400   19.0400 -111.6300       6.0        90       139       100
IR     2025250     91400   19.0200 -111.6500       6.0        86       140        99
IR     2025250     91400   19.0700 -111.7800       6.7        69       152        94
IR     2025250     91400   19.0900 -111.9700       6.4        97       165        94
IR     2025250     91400   19.0000 -112.0800       6.4       114       167       100
IR     2025250     91400   19.0800 -112.1300       6.0       116       169       100
IR     2025250     91400   19.0600 -112.2600       6.0       123       178       100
IR     2025250     91400   19.0800 -112.3500       5.4       119       226        99
IR     2025250     91400   19.0100 -112.6900       5.2       132       162        86
IR     2025250     91400   19.0000 -112.8500       5.8       147       155        86
IR     2025250     91400   19.0600 -112.9100       5.9       155       149        77
IR     2025250     91400   19.0500 -113.1200       6.5       175       132        98
IR     2025250     91400   19.0500 -113.2300       6.1       180       120        99
IR     2025250     91400   19.0100 -113.3100       5.4       181       116        95
IR     2025250     91400   19.0000 -113.4300       5.5       166       112        93
IR     2025250     91400   19.0000 -113.5900       8.8       160       113        99
IR     2025250     91400   18.9600 -113.6900      10.2       164       116        99
IR     2025250     91400   18.9900 -113.7700      12.7       165       116        98
IR     2025250     91400   19.0300 -113.8800      12.5       168       116        98
IR     2025250     91400   18.9400 -114.0600       9.3       185       127        93
IR     2025250     91400   18.9800 -114.1400      10.7       188       134        93
IR     2025250     91400   19.0200 -114.1800      12.0       185       139        99
IR     2025250     91400   18.9300 -114.4000      11.4       176       152        99
IR     2025250     91400   18.9300 -114.4700      10.2       178       151       100
IR     2025250     91400   18.9300 -114.5800       7.2       183       152        97
IR     2025250     91400   18.9500 -114.6500       6.4       187       153        88
IR     2025250     91400   19.0000 -114.8200       5.1       181       175        78
IR     2025250     91400   18.9200 -114.8800       4.5       191       193        79
IR     2025250     91400   18.9900 -115.2000       8.3       175       243        99
IR     2025250     91400   18.9100 -115.4000       5.8       166       200        87
IR     2025250     91400   18.9500 -115.4300       6.9       164       193        90
IR     2025250     91400   18.9800 -115.5200       7.1       163       189        87
IR     2025250     91400   18.9800 -115.6300       6.7       162       194        78
IR     2025250     91400   18.9600 -115.7700       6.1       175       200        94
IR     2025250     91400   18.9700 -115.9400       5.7       187       193        95
IR     2025250     91400   18.9700 -115.9700       5.6       185       191        94
IR     2025250     91400   18.8900 -116.1100       5.0       176       183        92
IR     2025250     91400   18.9200 -116.2200       4.8       176       170        91
IR     2025250     91400   18.9100 -116.8000       6.8       301       181       100
IR     2025250     91400   18.9400 -116.9200       9.0       293       179        92
IR     2025250     91400   18.9000 -118.0200       4.6       100       208        97
IR     2025250     91400   18.9000 -118.5400       4.2        17       193        80
IR     2025250     91400   18.8200 -118.6600       9.9         4       176        96
IR     2025250     91400   18.8200 -118.6800       9.9         4       175        95
IR     2025250     91400   18.8200 -118.8600      11.4        10       175        96
IR     2025250     91400   18.8900 -118.9100      12.4        17       172        96
IR     2025250     91400   18.8700 -119.0600      13.7        22       170       100
IR     2025250     91400   18.8500 -119.1900      14.0        21       171        88
IR     2025250     91400   18.8500 -119.2800      15.0        34       170        89
IR     2025250     91400   19.1000 -108.6700       4.2        38       177       100
IR     2025250     91400   19.0100 -108.8600       5.7        62       173        96
IR     2025250     91400   19.0000 -108.9900       5.5        51       176        99
IR     2025250     91400   19.0500 -109.3400       7.2        89       209        98
IR     2025250     91400   19.0300 -109.9100       5.6        73       184        93
IR     2025250     91400   19.0500 -109.9700       6.4        80       168        83
IR     2025250     91400   19.0400 -110.1900       7.3        83       159        92
IR     2025250     91400   19.0000 -110.3200       8.5        87       154        98
IR     2025250     91400   19.0400 -110.4100      10.5        96       154        99
IR     2025250     91400   19.0300 -110.5100      12.7        98       160       100
IR     2025250     91400   18.9500 -110.6000      11.7        93       172        83
IR     2025250     91400   18.9400 -110.8400       8.6        73       209        96
IR     2025250     91400   18.9400 -111.0100       6.4        54       180        94
IR     2025250     91400   19.0200 -111.0900       6.3        38       176       100
IR     2025250     91400   18.9300 -111.3000       7.9        75       161        88
IR     2025250     91400   18.9300 -111.3200       8.2        78       156        86
IR     2025250     91400   19.0000 -111.4200       7.6        89       136        93
IR     2025250     91400   18.9400 -111.6500       6.1        87       133        94
IR     2025250     91400   18.9800 -111.6600       5.8        84       138        97
IR     2025250     91400   18.9700 -111.8100       5.5        70       150        94
IR     2025250     91400   18.9100 -112.0100       7.2       116       163       100
IR     2025250     91400   18.9800 -112.1100       6.4       117       167       100
IR     2025250     91400   18.9000 -112.2200       7.5       140       169        99
IR     2025250     91400   18.9000 -112.3400       6.3       138       174        98
IR     2025250     91400   18.9700 -112.7000       5.3       134       159        91
IR     2025250     91400   18.8800 -112.9200       4.4       131       154        84
IR     2025250     91400   18.8800 -112.9700       4.4       129       153        84
IR     2025250     91400   18.8900 -113.0800       4.5       137       144        90
IR     2025250     91400   18.9100 -113.2600       4.0       153       129        94
IR     2025250     91400   18.8700 -113.3400       4.3       146       128       100
IR     2025250     91400   18.8600 -113.5000       6.2       152       122        99
IR     2025250     91400   18.9000 -113.5200       6.5       155       116        97
IR     2025250     91400   18.8600 -113.6400       7.7       166       123       100
IR     2025250     91400   18.9100 -113.8100      10.6       173       121        97
IR     2025250     91400   18.8500 -113.9600       6.3       177       128        93
IR     2025250     91400   18.8400 -114.0800       6.0       186       137        96
IR     2025250     91400   18.9200 -114.1800       9.7       186       143        96
IR     2025250     91400   18.8400 -114.2600       8.6       182       152        96
IR     2025250     91400   18.8700 -114.4100      10.1       177       154        99
IR     2025250     91400   18.9100 -114.4500      10.5       177       152        99
IR     2025250     91400   18.8900 -114.6100       7.6       184       154        99
IR     2025250     91400   18.8400 -114.7600       5.5       187       167        95
IR     2025250     91400   18.8800 -114.8600       4.2       194       187        78
IR     2025250     91400   18.8300 -115.1600       5.4       183       221        99
IR     2025250     91400   18.8700 -115.2000       6.1       179       231        99
IR     2025250     91400   18.8900 -115.4000       5.4       165       198        86
IR     2025250     91400   18.8500 -115.4300       4.5       160       194        80
IR     2025250     91400   18.8300 -115.9700       4.4       182       197        94
IR     2025250     91400   18.8500 -116.0800       5.2       182       189        93
IR     2025250     91400   18.8700 -116.1000       5.1       178       186        93
IR     2025250     91400   18.8400 -116.2800       4.0       191       176        97
IR     2025250     91400   18.7900 -116.8200       5.0       288       172        95
IR     2025250     91400   18.8500 -116.8900       7.7       285       172        99
IR     2025250     91400   18.7300 -118.4600       4.6        22       173        81
IR     2025250     91400   18.8000 -118.6400      10.2         2       173        97
IR     2025250     91400   18.8000 -118.7100       9.9         4       172        98
IR     2025250     91400   18.7400 -118.8200      10.3         6       174        99
IR     2025250     91400   18.7700 -118.8800      11.1        11       176        95
IR     2025250     91400   18.7100 -119.0000      12.3        17       177        95
IR     2025250     91400   18.7100 -119.1300      12.8        22       179        99
IR     2025250     91400   18.7500 -119.2700      13.7        31       180        96
IR     2025250     91400   18.9300 -108.8100       6.0        76       174       100
IR     2025250     91400   18.9900 -108.8700       6.0        64       174        97
IR     2025250     91400   18.9800 -108.9900       5.9        53       177        99
IR     2025250     91400   18.9000 -109.1900       9.2        77       195        85
IR     2025250     91400   18.9000 -109.2100       9.0        81       198        82
IR     2025250     91400   18.9100 -109.3300       7.5        93       233        92
IR     2025250     91400   18.9300 -109.8600       4.8        36       190        94
IR     2025250     91400   18.8700 -110.0400       5.9        39       169       100
IR     2025250     91400   18.8700 -110.0700       5.9        38       168       100
IR     2025250     91400   18.8600 -110.1900       5.3        43       161        99
IR     2025250     91400   18.9000 -110.3300       7.1        70       153        98
IR     2025250     91400   18.9400 -110.4400       9.5        91       150        95
IR     2025250     91400   18.8500 -110.6500      11.9        87       161        77
IR     2025250     91400   18.8500 -110.6700      10.5        76       171        99
IR     2025250     91400   18.8400 -110.8200       9.7        64       176        96
IR     2025250     91400   18.9000 -111.0000       7.1        65       175        98
IR     2025250     91400   18.9100 -111.0900       6.4        57       173        99
IR     2025250     91400   18.8300 -111.3700       8.8        88       149        90
IR     2025250     91400   18.9000 -111.5200       7.7        99       124        90
IR     2025250     91400   18.9000 -111.6100       6.2        97       127        88
IR     2025250     91400   18.8500 -111.7100       5.2        84       146        78
IR     2025250     91400   18.8100 -111.9400       6.1        94       159        90
IR     2025250     91400   18.8900 -112.0100       7.4       119       163       100
IR     2025250     91400   18.8000 -112.1700       7.9       135       168        98
IR     2025250     91400   18.8200 -112.2900       7.8       140       170        97
IR     2025250     91400   18.8400 -112.3000       7.5       138       170        97
IR     2025250     91400   18.8700 -112.6500       5.3       132       167        98
IR     2025250     91400   18.8200 -112.8000       4.1       142       165        98
IR     2025250     91400   18.7800 -112.9900       4.5       104       159        68
IR     2025250     91400   18.7900 -113.0100       4.6       106       156        67
IR     2025250     91400   18.8100 -113.1200       5.4       119       147        87
IR     2025250     91400   18.7700 -113.2700       5.0       131       140       100
IR     2025250     91400   18.8000 -113.4200       5.4       142       129       100
IR     2025250     91400   18.7600 -113.5500       6.4       156       130       100
IR     2025250     91400   18.8000 -113.6500       7.3       166       126        99
IR     2025250     91400   18.7500 -113.7300       7.9       174       129        99
IR     2025250     91400   18.7500 -113.9100       6.9       177       136        99
IR     2025250     91400   18.7500 -114.0100       5.8       174       143        99
IR     2025250     91400   18.7400 -114.1400       5.5       180       148        99
IR     2025250     91400   18.7400 -114.1700       5.6       179       148       100
IR     2025250     91400   18.8000 -114.2700       7.4       181       152        97
IR     2025250     91400   18.7500 -114.3900       7.0       182       153        99
IR     2025250     91400   18.7500 -114.5300       6.5       183       157        98
IR     2025250     91400   18.8100 -114.7000       6.7       182       165       100
IR     2025250     91400   18.8000 -114.7900       4.9       190       175        92
IR     2025250     91400   18.8000 -114.9000       4.0       200       194        88
IR     2025250     91400   18.7700 -116.0900       4.8       188       195        94
IR     2025250     91400   18.6500 -117.5800       4.1       353       235        97
IR     2025250     91400   18.7100 -118.4600       4.9        18       172        75
IR     2025250     91400   18.6200 -118.5600       8.6       356       174        89
IR     2025250     91400   18.6200 -118.6500      10.3       360       173        90
IR     2025250     91400   18.6600 -118.7500      10.7         3       172       100
IR     2025250     91400   18.6200 -118.8900      11.9        11       174       100
IR     2025250     91400   18.6100 -119.0200      12.0        20       176        99
IR     2025250     91400   18.6100 -119.0800      11.8        25       178       100
IR     2025250     91400   18.6300 -119.1600      12.0        28       180       100
IR     2025250     91400   18.8100 -108.7900       4.2        59       175        93
IR     2025250     91400   18.8100 -108.8900       6.2        64       175        97
IR     2025250     91400   18.8000 -109.0100       8.2        61       179        99
IR     2025250     91400   18.8800 -109.1900       9.4        75       196        89
IR     2025250     91400   18.8800 -109.2200       9.1        79       202        86
IR     2025250     91400   18.7700 -109.8700       5.1        28       233        97
IR     2025250     91400   18.7900 -109.9400       5.7        30       229       100
IR     2025250     91400   18.8500 -110.0700       5.9        35       168       100
IR     2025250     91400   18.7800 -110.1800       5.7        34       164        86
IR     2025250     91400   18.8000 -110.3500       6.8        54       153       100
IR     2025250     91400   18.8300 -110.4800       9.3        84       149        88
IR     2025250     91400   18.8300 -110.6300      10.2        81       158        99
IR     2025250     91400   18.8300 -110.6500      11.8        88       159        77
IR     2025250     91400   18.8200 -110.8200       9.7        64       172        94
IR     2025250     91400   18.7400 -110.9100       8.8        68       164        90
IR     2025250     91400   18.8100 -111.0900       6.7        73       170        84
IR     2025250     91400   18.8100 -111.2100       7.6        80       169        99
IR     2025250     91400   18.7200 -111.3700      10.9        94       151        99
IR     2025250     91400   18.7400 -111.3900      10.5        93       151        98
IR     2025250     91400   18.7600 -111.5500       7.2        89       139        93
IR     2025250     91400   18.7800 -111.6400       5.3        79       145        98
IR     2025250     91400   18.7100 -111.7900       4.1        55       151        91
IR     2025250     91400   18.7700 -111.9200       5.4        86       158        94
IR     2025250     91400   18.7200 -112.0700       6.4       121       172        85
IR     2025250     91400   18.7400 -112.0900       6.7       124       170        89
IR     2025250     91400   18.7700 -112.6500       4.7       136       174        93
IR     2025250     91400   18.6800 -112.9900       4.3       106       166        79
IR     2025250     91400   18.7100 -113.0000       4.7       103       162        74
IR     2025250     91400   18.7500 -113.1300       6.0       115       152        84
IR     2025250     91400   18.7500 -113.2500       5.3       128       142        99
IR     2025250     91400   18.7200 -113.3700       5.5       133       136       100
IR     2025250     91400   18.6800 -113.4900       5.6       148       132        99
IR     2025250     91400   18.6600 -113.6600       6.2       171       133       100
IR     2025250     91400   18.7100 -113.7900       8.0       175       138        98
IR     2025250     91400   18.7300 -113.9000       7.3       177       144        98
IR     2025250     91400   18.7300 -114.0100       5.8       174       145        99
IR     2025250     91400   18.7200 -114.0300       5.6       173       146       100
IR     2025250     91400   18.7200 -114.1500       5.6       181       148        99
IR     2025250     91400   18.7200 -114.2600       6.4       176       149        95
IR     2025250     91400   18.6700 -114.4500       6.2       184       154        97
IR     2025250     91400   18.7100 -114.5400       6.3       183       157        99
IR     2025250     91400   18.6300 -114.7100       4.7       188       168       100
IR     2025250     91400   18.6400 -115.0500       4.5       209       202        99
IR     2025250     91400   18.6700 -115.1100       4.2       206       210        99
IR     2025250     91400   18.6300 -117.5700       4.2       355       242        97
IR     2025250     91400   18.5900 -118.2900       4.5        31       177        98
IR     2025250     91400   18.5300 -118.4100       6.7         5       176       100
IR     2025250     91400   18.6100 -118.4600       6.9         6       173        87
IR     2025250     91400   18.5800 -118.7200      10.0         4       174        96
IR     2025250     91400   18.5800 -118.8700      11.5        13       174       100
IR     2025250     91400   18.5500 -119.1300      11.9        30       177        96
IR     2025250     91400   18.5900 -119.3200      12.4        43       180        82
IR     2025250     91400   18.7300 -108.8600       6.5        68       172       100
IR     2025250     91400   18.7800 -108.8900       6.4        65       175        99
IR     2025250     91400   18.7400 -109.0300       9.3        73       185        99
IR     2025250     91400   18.6900 -109.2400       7.9        73       232        98
IR     2025250     91400   18.6900 -109.2600       7.5        73       233        97
IR     2025250     91400   18.7500 -109.8800       5.3        29       236        99
IR     2025250     91400   18.6600 -110.0900       6.9        37       194       100
IR     2025250     91400   18.6600 -110.1200       6.9        37       183       100
IR     2025250     91400   18.7000 -110.2500       6.5        36       163        96
IR     2025250     91400   18.6500 -110.4300       8.5        51       151        83
IR     2025250     91400   18.6500 -110.4800       8.8        59       143        82
IR     2025250     91400   18.6900 -110.6900      10.3        87       158       100
IR     2025250     91400   18.7200 -110.7300      10.1        80       161        99
IR     2025250     91400   18.7200 -110.8900       8.9        70       163        92
IR     2025250     91400   18.7200 -111.0100       8.6        72       162        76
IR     2025250     91400   18.6900 -111.0700       8.5        77       160        69
IR     2025250     91400   18.6300 -111.2900      10.5        90       150        98
IR     2025250     91400   18.6200 -111.3700      11.4        92       143       100
IR     2025250     91400   18.7000 -111.4200      11.1        92       148        98
IR     2025250     91400   18.6800 -111.5400       7.9        86       148        97
IR     2025250     91400   18.6900 -111.7500       4.0        58       150        99
IR     2025250     91400   18.6700 -111.9700       4.9       100       172        94
IR     2025250     91400   18.6800 -112.0800       6.1       122       175        85
IR     2025250     91400   18.6200 -112.1900       6.1       124       176        93
IR     2025250     91400   18.6700 -112.3400       5.9       121       176        88
IR     2025250     91400   18.6500 -112.9900       4.2       108       166        80
IR     2025250     91400   18.6100 -113.2300       5.3       142       149        85
IR     2025250     91400   18.6200 -113.3700       5.3       151       136       100
IR     2025250     91400   18.6400 -113.4600       5.2       148       133        99
IR     2025250     91400   18.5600 -113.6300       4.0       180       135       100
IR     2025250     91400   18.5800 -113.6500       4.6       178       135       100
IR     2025250     91400   18.6300 -113.7800       6.8       178       141       100
IR     2025250     91400   18.5500 -113.8900       5.8       179       150       100
IR     2025250     91400   18.5400 -114.0200       5.5       176       153        99
IR     2025250     91400   18.5400 -114.1200       5.4       176       151        93
IR     2025250     91400   18.6200 -114.2100       6.0       182       149        95
IR     2025250     91400   18.5300 -114.3700       5.6       182       146        98
IR     2025250     91400   18.5300 -114.5500       5.5       185       156       100
IR     2025250     91400   18.5900 -114.5600       5.1       186       157       100
IR     2025250     91400   18.6100 -114.7100       4.4       188       168       100
IR     2025250     91400   18.5800 -114.9900       5.4       201       191        98
IR     2025250     91400   18.5200 -115.0700       5.9       206       201        99
IR     2025250     91400   18.4600 -117.8600       4.1       103       244        79
IR     2025250     91400   18.5100 -118.2800       4.8        21       179        99
IR     2025250     91400   18.4500 -118.4000       6.0         5       179        97
IR     2025250     91400   18.5100 -118.5000       7.7       356       177       100
IR     2025250     91400   18.4300 -118.9600      12.7        13       185        98
IR     2025250     91400   18.4500 -119.1100      11.9        22       173        98
IR     2025250     91400   18.4100 -119.1300      11.5        22       173        97
IR     2025250     91400   18.4100 -119.2600       9.6        35       170        80
IR     2025250     91400   18.6800 -108.8700       7.0        71       168        99
IR     2025250     91400   18.6000 -108.9900       9.9        77       167        92
IR     2025250     91400   18.6000 -109.1400       8.9        74       202        96
IR     2025250     91400   18.6500 -109.2000       7.7        75       222        97
IR     2025250     91400   18.6500 -109.9300       6.1        28       245        98
IR     2025250     91400   18.6200 -110.2000       7.5        47       169        99
IR     2025250     91400   18.5500 -110.4300       9.2        50       160        70
IR     2025250     91400   18.5500 -110.4500       9.2        51       158        71
IR     2025250     91400   18.5500 -110.5800       9.8        70       146        79
IR     2025250     91400   18.6000 -110.7300      12.6       101       157        99
IR     2025250     91400   18.5400 -110.8900       9.4        82       159        85
IR     2025250     91400   18.5400 -111.0100       7.7        56       159        79
IR     2025250     91400   18.5300 -111.0800       7.5        53       157        76
IR     2025250     91400   18.5900 -111.1600       8.0        73       156        76
IR     2025250     91400   18.6000 -111.3500      11.1        91       143        99
IR     2025250     91400   18.6000 -111.4900      10.5        86       143        99
IR     2025250     91400   18.5200 -111.6000       7.6        90       143        91
IR     2025250     91400   18.5200 -111.6500       6.4        93       146        90
IR     2025250     91400   18.5600 -111.9900       4.2        92       171        95
IR     2025250     91400   18.5400 -112.1100       5.3       112       174        93
IR     2025250     91400   18.5000 -112.2900       5.8       109       169        98
IR     2025250     91400   18.5700 -112.3900       4.5       107       175        92
IR     2025250     91400   18.5300 -113.9100       5.7       177       151       100
IR     2025250     91400   18.5300 -113.9600       5.6       177       152       100
IR     2025250     91400   18.5200 -114.0700       5.4       176       151        98
IR     2025250     91400   18.4400 -114.2500       5.1       189       145        95
IR     2025250     91400   18.4600 -114.3400       5.2       186       146        96
IR     2025250     91400   18.4300 -114.5200       6.0       182       159        97
IR     2025250     91400   18.4700 -114.5400       6.2       180       157        99
IR     2025250     91400   18.4800 -114.7400       4.9       174       174       100
IR     2025250     91400   18.4200 -114.7900       4.5       176       181        99
IR     2025250     91400   18.4200 -114.9700       4.2       200       194        99
IR     2025250     91400   18.5000 -115.0700       5.7       207       204        99
IR     2025250     91400   18.4700 -115.1000       5.6       209       208        99
IR     2025250     91400   18.3800 -116.9700       4.3        13       174        99
IR     2025250     91400   18.3400 -118.0300       4.1        66       192        93
IR     2025250     91400   18.3800 -118.0600       4.1        43       190        93
IR     2025250     91400   18.3300 -118.1600       5.7        23       181        95
IR     2025250     91400   18.3300 -118.2700       5.6        19       177        97
IR     2025250     91400   18.3700 -118.3900       5.2        11       178        97
IR     2025250     91400   18.3200 -118.5700       8.1       358       182        98
IR     2025250     91400   18.3200 -118.6100       9.7       358       182       100
IR     2025250     91400   18.3400 -118.7200      10.5         0       190        98
IR     2025250     91400   18.3700 -118.9900      12.1        10       188        88
IR     2025250     91400   18.3900 -119.1400      11.4        20       173        97
IR     2025250     91400   18.3900 -119.2900       9.3        32       168        69
IR     2025250     91400   18.5100 -108.8200       6.2        70       146        93
IR     2025250     91400   18.5800 -109.0000      10.1        77       164        91
IR     2025250     91400   18.5600 -109.1000       9.7        72       167        93
IR     2025250     91400   18.5100 -109.2300       7.5        60       184        99
IR     2025250     91400   18.5500 -109.3000       6.2        55       221        99
IR     2025250     91400   18.4900 -109.4100       5.4        47       219        97
IR     2025250     91400   18.5100 -109.8600       5.0        23       263        99
IR     2025250     91400   18.5300 -109.9800       6.2        32       246        90
IR     2025250     91400   18.4600 -110.2400       9.2        61       177        92
IR     2025250     91400   18.5300 -110.4400       9.5        51       162        68
IR     2025250     91400   18.5300 -110.4600       9.4        52       159        69
IR     2025250     91400   18.5300 -110.5800       9.9        70       147        76
IR     2025250     91400   18.5200 -110.8000      11.8        93       156        97
IR     2025250     91400   18.5200 -110.8900       9.3        79       159        88
IR     2025250     91400   18.5100 -111.0400       7.6        50       158        80
IR     2025250     91400   18.5100 -111.0800       7.4        50       157        80
IR     2025250     91400   18.5100 -111.2300       7.2        65       149        87
IR     2025250     91400   18.4900 -111.3300       7.9        80       138        95
IR     2025250     91400   18.4400 -111.5300       7.9        86       125        92
IR     2025250     91400   18.5000 -111.5800       8.2        90       135        93
IR     2025250     91400   18.4100 -111.7200       4.9       104       135       100
IR     2025250     91400   18.4500 -111.7800       4.1       110       145        94
IR     2025250     91400   18.4600 -112.0100       5.9        99       162        83
IR     2025250     91400   18.4600 -112.1500       6.2       104       167        99
IR     2025250     91400   18.4600 -112.2700       5.7       111       165        96
IR     2025250     91400   18.4200 -114.2300       4.7       188       145        92
IR     2025250     91400   18.4100 -114.5500       5.7       181       163        99
IR     2025250     91400   18.3800 -114.7600       4.8       172       178       100
IR     2025250     91400   18.4000 -114.7800       4.7       173       178       100
IR     2025250     91400   18.4000 -114.9800       4.1       202       195        99
IR     2025250     91400   18.3900 -115.0900       4.7       210       206        98
IR     2025250     91400   18.3900 -115.1100       4.8       211       209        98
IR     2025250     91400   18.3500 -116.9600       4.9        14       170        95
IR     2025250     91400   18.2600 -117.1100       4.3        77       180        95
IR     2025250     91400   18.2700 -118.2100       6.5        18       177        94
IR     2025250     91400   18.2300 -118.3700       4.2        25       177       100
IR     2025250     91400   18.2300 -118.3900       4.2        26       177       100
IR     2025250     91400   18.2300 -118.5000       5.4         9       177        99
IR     2025250     91400   18.2600 -118.6400      10.7         0       182       100
IR     2025250     91400   18.2200 -118.8000      10.4         5       200        92
IR     2025250     91400   18.2200 -118.8200       9.9         5       201        93
IR     2025250     91400   18.2900 -119.0000      10.7         5       190        89
IR     2025250     91400   18.2700 -119.0300      10.6         4       189        88
IR     2025250     91400   18.2500 -119.2200      11.6         5       174        96
IR     2025250     91400   18.4800 -108.8200       6.3        72       140        93
IR     2025250     91400   18.4400 -109.0500      10.7        77       125        82
IR     2025250     91400   18.4800 -109.1200      10.1        71       136        87
IR     2025250     91400   18.4300 -109.3000       7.9        59       173        99
IR     2025250     91400   18.3800 -109.4300       6.1        45       182       100
IR     2025250     91400   18.3800 -109.4600       5.9        46       184       100
IR     2025250     91400   18.3800 -109.6300       5.6        27       229        99
IR     2025250     91400   18.3700 -109.7300       6.8         6       280       100
IR     2025250     91400   18.4500 -109.9000       6.8         9       279        97
IR     2025250     91400   18.3600 -110.0400       5.8        14       280        97
IR     2025250     91400   18.3600 -110.1200       6.2        41       234        94
IR     2025250     91400   18.3600 -110.2600       8.1        53       176        94
IR     2025250     91400   18.4300 -110.3600       9.6        60       170        83
IR     2025250     91400   18.4300 -110.4100       9.5        59       169        73
IR     2025250     91400   18.3900 -110.5400       8.0        56       164        78
IR     2025250     91400   18.3600 -110.7600       8.9        82       149        99
IR     2025250     91400   18.3800 -110.8500       9.3        76       152        93
IR     2025250     91400   18.4200 -110.9900       8.3        48       158        73
IR     2025250     91400   18.4100 -111.0600       7.7        40       157        76
IR     2025250     91400   18.3900 -111.1300       7.3        40       155        89
IR     2025250     91400   18.3300 -111.2700       4.6        54       140        72
IR     2025250     91400   18.4000 -111.3700       6.1        78       130        96
IR     2025250     91400   18.4000 -111.5800       6.8        95       114        88
IR     2025250     91400   18.3900 -111.7000       5.6       104       127       100
IR     2025250     91400   18.3900 -111.7700       5.1       114       140        93
IR     2025250     91400   18.3100 -111.8800       4.4       100       149        99
IR     2025250     91400   18.3900 -111.9600       5.3       100       156        89
IR     2025250     91400   18.3000 -112.1900       7.0        87       146        98
IR     2025250     91400   18.3600 -112.2200       6.8        96       154        99
IR     2025250     91400   18.3500 -112.3900       4.9       100       145        98
IR     2025250     91400   18.3200 -112.9000       4.3       124       129        93
IR     2025250     91400   18.1600 -117.0100       4.6        92       172        96
IR     2025250     91400   18.2400 -117.1100       4.5        84       179        96
IR     2025250     91400   18.1600 -117.1900       5.0       131       195        91
IR     2025250     91400   18.1500 -117.7100       4.8        25       246        85
IR     2025250     91400   18.2100 -118.3900       4.1        27       176       100
IR     2025250     91400   18.1900 -118.5000       5.4        10       175        98
IR     2025250     91400   18.2000 -118.6500      11.2         1       181        98
IR     2025250     91400   18.1200 -118.7700       9.8         9       197       100
IR     2025250     91400   18.1200 -118.8100       8.9        12       203        98
IR     2025250     91400   18.2000 -118.9300       8.4         2       194        94
IR     2025250     91400   18.1900 -119.0400       8.7       359       190        96
IR     2025250     91400   18.1100 -119.2200      10.3         5       174        99
IR     2025250     91400   18.1100 -119.2400      10.6         6       170        99
IR     2025250     91400   18.3000 -108.8700       5.3        72       132        78
IR     2025250     91400   18.3400 -109.0800       9.6        81       125        86
IR     2025250     91400   18.3600 -109.1000       9.6        76       125        76
IR     2025250     91400   18.3700 -109.3200       7.7        63       158        88
IR     2025250     91400   18.3700 -109.3600       6.9        54       173        89
IR     2025250     91400   18.3200 -109.5700       6.0        42       226        94
IR     2025250     91400   18.3100 -109.9100       8.1         6       293        98
IR     2025250     91400   18.3300 -110.0300       6.3         9       286       100
IR     2025250     91400   18.3200 -110.1000       5.8        23       264        98
IR     2025250     91400   18.3400 -110.2700       7.6        49       176        92
IR     2025250     91400   18.3100 -110.5100       8.0        51       165        78
IR     2025250     91400   18.3300 -110.6500       7.6        67       155        99
IR     2025250     91400   18.3200 -110.8400       8.8        72       149        95
IR     2025250     91400   18.2600 -110.9500       8.1        66       150       100
IR     2025250     91400   18.2700 -111.0900       7.8        67       153        94
IR     2025250     91400   18.2500 -111.2100       6.8        75       149        96
IR     2025250     91400   18.2500 -111.2400       6.1        80       147        99
IR     2025250     91400   18.2600 -111.4500       5.0        86       117        98
IR     2025250     91400   18.2800 -111.5800       4.5        91       110        91
IR     2025250     91400   18.2900 -111.7900       4.2       102       130       100
IR     2025250     91400   18.2200 -112.1300       5.9        90       133        97
IR     2025250     91400   18.2800 -112.1700       6.9        85       143        98
IR     2025250     91400   18.2600 -112.2900       7.6        89       136        99
IR     2025250     91400   18.2500 -112.4500       5.0        96       135       100
IR     2025250     91400   18.1800 -115.8000       4.5       193       181        78
IR     2025250     91400   18.1700 -115.9300       5.8       202       188        94
IR     2025250     91400   18.0600 -117.1200       5.2       138       192        97
IR     2025250     91400   18.1400 -117.1900       5.2       136       196        96
IR     2025250     91400   18.0500 -117.7700       4.8        28       226        98
IR     2025250     91400   18.0600 -118.2000       4.0        16       187        92
IR     2025250     91400   18.1100 -118.4900       4.6        11       175        87
IR     2025250     91400   18.0500 -118.6300       7.5         9       178        94
IR     2025250     91400   18.0200 -118.9400       7.6        13       204        96
IR     2025250     91400   18.0200 -119.0000       8.0         5       196        95
IR     2025250     91400   18.0200 -119.0700       8.8         2       192        96
IR     2025250     91400   18.2800 -108.8500       5.4        68       138        80
IR     2025250     91400   18.2800 -108.8700       5.3        72       137        80
IR     2025250     91400   18.2000 -109.0200       9.4        99       142        78
IR     2025250     91400   18.1900 -109.2400      10.9        80       150        99
IR     2025250     91400   18.2500 -109.3400      11.0        68       162        91
IR     2025250     91400   18.2700 -109.3600      10.3        65       166        84
IR     2025250     91400   18.2600 -109.5100       8.1        47       188        88
IR     2025250     91400   18.2000 -109.6500       7.8        34       230        78
IR     2025250     91400   18.2500 -109.8000       8.4         5       286       100
IR     2025250     91400   18.2400 -110.1200       6.4         8       266        99
IR     2025250     91400   18.1600 -110.2800       6.1         9       179        84
IR     2025250     91400   18.2400 -110.3400       6.7        33       174        90
IR     2025250     91400   18.1900 -110.5100       7.5        53       159        86
IR     2025250     91400   18.2300 -110.5500       8.0        55       161        87
IR     2025250     91400   18.1600 -110.7400       7.4        67       156        97
IR     2025250     91400   18.1400 -110.8800       8.5        78       151        98
IR     2025250     91400   18.1900 -110.9900       8.5        69       149       100
IR     2025250     91400   18.1500 -111.1200       9.7        71       150       100
IR     2025250     91400   18.1900 -111.2500       7.5        69       145        94
IR     2025250     91400   18.1700 -111.3000       6.6        68       140        86
IR     2025250     91400   18.2000 -111.4800       4.4        76       116        99
IR     2025250     91400   18.1900 -111.7200       4.3        72       112        98
IR     2025250     91400   18.1400 -112.1500       5.5        92       123        99
IR     2025250     91400   18.1400 -112.2500       7.1        91       122       100
IR     2025250     91400   18.1500 -112.3300       7.9        91       127       100
IR     2025250     91400   18.0900 -112.4900       5.9       102       124        94
IR     2025250     91400   18.0300 -114.7300       4.2       314       176        89
IR     2025250     91400   18.0500 -114.7500       4.1       313       176        92
IR     2025250     91400   18.0000 -117.2100       4.5       143       208        98
IR     2025250     91400   17.9500 -117.8300       4.1        39       217        96
IR     2025250     91400   18.0000 -117.9700       4.9        15       219        97
IR     2025250     91400   17.9600 -118.2000       6.3         2       204       100
IR     2025250     91400   18.0100 -118.3400       4.7        14       182        99
IR     2025250     91400   17.9900 -118.3800       5.9        10       180        99
IR     2025250     91400   17.9400 -118.7300       5.0        16       193        98
IR     2025250     91400   17.9200 -118.8700       6.7        24       217        98
IR     2025250     91400   17.9200 -118.9100       8.0        17       216        92
IR     2025250     91400   18.0000 -118.9800       8.5         7       199        90
IR     2025250     91400   17.9800 -119.0900       9.4         3       190        93
IR     2025250     91400   17.9100 -119.2100      10.8         4       169        96
IR     2025250     91400   17.9300 -119.4000      13.4        10       142        97
IR     2025250     91400   18.1400 -108.9600       5.7        74       151        95
IR     2025250     91400   18.1500 -109.0700       9.0        94       150        85
IR     2025250     91400   18.0900 -109.2100       9.5        84       157        97
IR     2025250     91400   18.0900 -109.3600      11.3        78       179        99
IR     2025250     91400   18.1100 -109.9300       5.1        16       267        99
IR     2025250     91400   18.0600 -110.0600       5.3       359       233        95
IR     2025250     91400   18.1400 -110.1400       6.8       357       222        96
IR     2025250     91400   18.1400 -110.2600       6.4         4       180        84
IR     2025250     91400   18.1100 -110.3400       6.2        14       170        74
IR     2025250     91400   18.1300 -110.4600       6.5        43       153        86
IR     2025250     91400   18.0700 -110.6400       8.8        77       149       100
IR     2025250     91400   18.0400 -110.6900       8.7        77       151        99
IR     2025250     91400   18.0400 -110.9100       8.6        74       152        90
IR     2025250     91400   18.0300 -111.0200       9.7        72       150        88
IR     2025250     91400   18.0300 -111.0500       9.9        71       150        89
IR     2025250     91400   18.0300 -111.1900      10.4        68       153        99
IR     2025250     91400   18.0200 -111.3800       8.1        72       144        96
IR     2025250     91400   18.0400 -111.4000       7.4        73       137        98
IR     2025250     91400   18.0200 -111.5200       6.9        80       128        86
IR     2025250     91400   18.0700 -111.6500       4.7        89       116        93
IR     2025250     91400   18.0300 -111.8500       4.8        82       126        99
IR     2025250     91400   18.0900 -111.8600       4.2        80       124       100
IR     2025250     91400   18.0200 -112.0400       5.6        90       123        91
IR     2025250     91400   18.0400 -112.1700       6.1        94       111        89
IR     2025250     91400   18.0800 -112.2300       6.8        92       114        94
IR     2025250     91400   18.0500 -112.4300       7.0        96       114        98
IR     2025250     91400   18.0700 -112.4900       5.7       102       123        93
IR     2025250     91400   17.9700 -114.6100       4.0       315       173        91
IR     2025250     91400   17.9900 -114.7200       4.1       320       176        84
IR     2025250     91400   18.0100 -114.7400       4.0       315       176        87
IR     2025250     91400   17.8700 -116.8900       4.0       345       196        98
IR     2025250     91400   17.9100 -117.8400       4.3        30       213        91
IR     2025250     91400   17.9200 -117.9200       6.7        13       218        97
IR     2025250     91400   17.9200 -118.1200       7.5       356       210       100
IR     2025250     91400   17.8400 -118.2100       9.1       355       207        95
IR     2025250     91400   17.8300 -118.3400       7.2         8       195       100
IR     2025250     91400   17.8300 -118.3700       7.8         7       194       100
IR     2025250     91400   17.8900 -118.5100       8.5         4       179        99
IR     2025250     91400   17.9100 -118.5900       6.9         4       176        96
IR     2025250     91400   17.8800 -118.9400       8.8        14       206        92
IR     2025250     91400   17.9000 -119.0400      10.2         7       190        94
IR     2025250     91400   17.8200 -119.1600      12.0         6       170       100
IR     2025250     91400   17.8100 -119.2900      13.1         6       162        97
IR     2025250     91400   17.8100 -119.3100      13.3         7       160        97
IR     2025250     91400   18.0200 -108.9600       6.1        71       158       100
IR     2025250     91400   18.0400 -109.0500       7.5        86       157        96
IR     2025250     91400   18.0100 -109.2600       8.5        88       167        95
IR     2025250     91400   18.0100 -109.3500       9.5        84       208        96
IR     2025250     91400   18.0400 -110.0900       5.6       358       219        91
IR     2025250     91400   18.0200 -110.2900       6.5         7       175        68
IR     2025250     91400   17.9700 -110.3500       6.1        27       156        72
IR     2025250     91400   18.0300 -110.5000       7.3        63       139        88
IR     2025250     91400   17.9600 -110.6800       8.8        74       143        97
IR     2025250     91400   17.9400 -110.7100       8.5        72       145        92
IR     2025250     91400   17.9600 -110.8300       7.7        62       152        92
IR     2025250     91400   18.0100 -110.9800       9.1        69       151        90
IR     2025250     91400   17.9300 -111.0700       9.7        61       157        96
IR     2025250     91400   17.9900 -111.1800      10.4        68       157        95
IR     2025250     91400   18.0000 -111.3600       8.8        70       150        95
IR     2025250     91400   18.0000 -111.4100       8.1        75       141        95
IR     2025250     91400   17.9200 -111.5400       8.1        79       132        77
IR     2025250     91400   17.9900 -111.6500       5.9        82       123        85
IR     2025250     91400   17.9900 -111.8300       5.6        82       127        99
IR     2025250     91400   17.9900 -111.9000       5.9        84       126        99
IR     2025250     91400   17.9200 -112.0600       7.3        84       123        97
IR     2025250     91400   17.9200 -112.1700       6.3        78       111        86
IR     2025250     91400   17.9200 -112.2500       6.0        74       109        88
IR     2025250     91400   17.9700 -112.3500       5.9        87       109        87
IR     2025250     91400   17.7700 -116.8600       5.4       355       196       100
IR     2025250     91400   17.7900 -117.5700       4.2        36       227        90
IR     2025250     91400   17.7500 -117.9300       5.7        11       215        97
IR     2025250     91400   17.8200 -118.0900      10.7       358       211        90
IR     2025250     91400   17.8000 -118.2200      10.2       357       208        96
IR     2025250     91400   17.7600 -118.2500      10.6       360       206        96
IR     2025250     91400   17.7500 -118.4200       9.2         7       192       100
IR     2025250     91400   17.7900 -118.5400       7.5         5       180       100
IR     2025250     91400   17.8100 -118.5600       7.3         4       179       100
IR     2025250     91400   17.7200 -119.2400      13.4        10       165        98
IR     2025250     91400   17.7900 -119.2900      13.4         7       161        96
IR     2025250     91400   17.7900 -119.4200      13.5         9       148        96
IR     2025250     91400   17.9200 -108.9400       6.0        92       164        95
IR     2025250     91400   17.9300 -109.1500       7.3        93       167        97
IR     2025250     91400   17.8900 -109.2100       7.0        98       223        98
IR     2025250     91400   17.9000 -109.6000       5.7        70       241        99
IR     2025250     91400   17.8800 -109.6500       5.7        54       244        99
IR     2025250     91400   17.8600 -110.0600       4.3         3       199        91
IR     2025250     91400   17.8800 -110.1300       5.0         0       188        90
IR     2025250     91400   17.8800 -110.2500       5.6         3       178        81
IR     2025250     91400   17.8900 -110.3700       6.1        35       157        74
IR     2025250     91400   17.8700 -110.5200       8.2        63       142        99
IR     2025250     91400   17.8800 -110.7000       8.3        70       142        94
IR     2025250     91400   17.9200 -110.7200       8.3        70       145        89
IR     2025250     91400   17.8400 -110.9300       8.0        60       156        99
IR     2025250     91400   17.8600 -110.9700       8.7        65       157        99
IR     2025250     91400   17.8900 -111.1000       9.9        67       159        98
IR     2025250     91400   17.9100 -111.2400      10.8        69       160        98
IR     2025250     91400   17.9000 -111.5500       8.4        79       133        76
IR     2025250     91400   17.8100 -111.6800       8.1        68       134        82
IR     2025250     91400   17.8500 -111.7700       8.0        72       131        88
IR     2025250     91400   17.8900 -111.9000       8.0        78       129       100
IR     2025250     91400   17.8800 -112.0900       7.7        81       124        95
IR     2025250     91400   17.8800 -112.1100       7.7        81       122        93
IR     2025250     91400   17.8800 -112.2800       6.5        63       110        93
IR     2025250     91400   17.7900 -112.4600       6.1        32       113        99
IR     2025250     91400   17.8100 -112.4800       5.5        28       112       100
IR     2025250     91400   17.8000 -113.5800       4.1       348       140        90
IR     2025250     91400   17.8200 -114.4400       4.0       326       167        94
IR     2025250     91400   17.7200 -114.9700       4.5       306       204       100
IR     2025250     91400   17.7600 -115.0300       4.3       313       203       100
IR     2025250     91400   17.7400 -115.9700       4.5        30       198        94
IR     2025250     91400   17.6900 -116.0000       4.4        56       198        85
IR     2025250     91400   17.6900 -116.1900       4.6        78       208       100
IR     2025250     91400   17.7500 -116.2700       4.2        71       208       100
IR     2025250     91400   17.7500 -116.8200       5.1       359       197        98
IR     2025250     91400   17.7500 -116.8600       5.5       359       197       100
IR     2025250     91400   17.6700 -117.0700       4.1        11       196        92
IR     2025250     91400   17.6600 -117.4000       6.6        52       230        99
IR     2025250     91400   17.7300 -117.5800       6.3        25       221        96
IR     2025250     91400   17.6900 -117.6100       7.8        17       216        98
IR     2025250     91400   17.6700 -117.8100       4.4         4       214        92
IR     2025250     91400   17.6900 -117.8300       4.2         3       214        91
IR     2025250     91400   17.7300 -117.9300       5.7         8       215        95
IR     2025250     91400   17.6800 -118.0500       9.1       356       211        99
IR     2025250     91400   17.6400 -118.2500      11.3       357       204        99
IR     2025250     91400   17.6400 -118.2700      11.4       358       203       100
IR     2025250     91400   17.7100 -118.4500       9.2         7       191        98
IR     2025250     91400   17.6500 -118.5400       6.4        13       181        95
IR     2025250     91400   17.6600 -119.2500      14.2        13       166       100
IR     2025250     91400   17.6400 -119.2700      14.8        11       165       100
IR     2025250     91400   17.6900 -119.4100      15.8         7       153        91
IR     2025250     91400   17.8000 -108.9600       7.1       108       215       100
IR     2025250     91400   17.8000 -109.0400       7.0       107       217       100
IR     2025250     91400   17.8700 -109.1400       7.1       102       208        99
IR     2025250     91400   17.7900 -109.2600       6.1        95       252        98
IR     2025250     91400   17.8600 -109.4400       5.8        76       238        98
IR     2025250     91400   17.8400 -109.5400       5.5        64       244        97
IR     2025250     91400   17.8400 -109.6800       5.8        40       245        99
IR     2025250     91400   17.7700 -109.8200       7.5        20       239        97
IR     2025250     91400   17.8100 -109.8800       6.4        13       238        93
IR     2025250     91400   17.8200 -110.0500       4.5        10       200        90
IR     2025250     91400   17.8400 -110.0900       4.6         7       194        92
IR     2025250     91400   17.8400 -110.2100       5.1         5       182        88
IR     2025250     91400   17.8200 -110.3100       5.3        21       166        83
IR     2025250     91400   17.8300 -110.4300       7.6        51       155        89
IR     2025250     91400   17.7500 -110.5900       9.1        67       144       100
IR     2025250     91400   17.7600 -110.7300       8.5        66       142       100
IR     2025250     91400   17.7800 -110.8700       6.8        60       153        95
IR     2025250     91400   17.8200 -110.9500       8.0        63       158        97
IR     2025250     91400   17.7300 -111.0400       8.3        77       162        92
IR     2025250     91400   17.7900 -111.2400      10.8        80       160        99
IR     2025250     91400   17.7600 -111.3700      10.4        80       156       100
IR     2025250     91400   17.7200 -111.6300       7.5        68       144        98
IR     2025250     91400   17.7100 -111.8200       9.2        60       142        98
IR     2025250     91400   17.7300 -111.8900       9.0        61       141       100
IR     2025250     91400   17.7500 -111.9800       7.6        63       136       100
IR     2025250     91400   17.7400 -112.1700       6.9        64       130        95
IR     2025250     91400   17.7400 -112.1900       6.8        62       129        92
IR     2025250     91400   17.7100 -112.4000       7.5        28       123        99
IR     2025250     91400   17.6900 -112.4300       7.4        22       124       100
IR     2025250     91400   17.6900 -112.5700       7.3        10       126       100
IR     2025250     91400   17.7100 -112.6800       4.7         4       126        99
IR     2025250     91400   17.7000 -113.4400       4.1        10       138        96
IR     2025250     91400   17.6800 -113.6500       4.9       359       143        99
IR     2025250     91400   17.7200 -113.7300       4.1       357       141        99
IR     2025250     91400   17.6500 -113.8800       4.1       358       143        99
IR     2025250     91400   17.6500 -114.0200       4.1       359       145        98
IR     2025250     91400   17.6800 -114.1200       4.3       352       151        99
IR     2025250     91400   17.6400 -114.1800       4.8       344       160        99
IR     2025250     91400   17.6600 -114.3100       4.5       335       170        97
IR     2025250     91400   17.7000 -114.3700       4.4       328       170        99
IR     2025250     91400   17.7100 -114.5000       4.1       325       172        97
IR     2025250     91400   17.6300 -114.6700       4.7       329       190        99
IR     2025250     91400   17.6800 -114.9100       4.3       308       209        99
IR     2025250     91400   17.6700 -116.2000       4.7        79       208        99
IR     2025250     91400   17.6300 -116.8200       4.3         7       200        98
IR     2025250     91400   17.5900 -116.9300       4.9       359       196       100
IR     2025250     91400   17.5600 -117.3300       4.8        65       231        96
IR     2025250     91400   17.5600 -117.3500       5.2        64       232        95
IR     2025250     91400   17.6300 -117.8000       4.5        13       213        79
IR     2025250     91400   17.5600 -118.1300       9.7       352       207        98
IR     2025250     91400   17.6200 -118.2700      11.5       358       202       100
IR     2025250     91400   17.5400 -118.3000      12.1       358       199       100
IR     2025250     91400   17.5800 -118.4500       9.5         3       189       100
IR     2025250     91400   17.6100 -118.5700       4.6        16       178        98
IR     2025250     91400   17.5200 -119.2000      13.6        14       174        94
IR     2025250     91400   17.5200 -119.2700      15.8        12       171        97
IR     2025250     91400   17.5200 -119.3500      17.3         8       168        99
IR     2025250     91400   17.7200 -108.9300       6.8       110       220        99
IR     2025250     91400   17.7600 -109.0500       6.8       107       228        99
IR     2025250     91400   17.6900 -109.1600       6.1       103       238        97
IR     2025250     91400   17.6900 -109.3100       6.1        80       245       100
IR     2025250     91400   17.7700 -109.3600       5.3        82       250        95
IR     2025250     91400   17.7000 -109.4700       6.2        75       230        99
IR     2025250     91400   17.7200 -109.5900       6.7        54       229        95
IR     2025250     91400   17.7300 -109.8000       7.9        21       232        97
IR     2025250     91400   17.7500 -109.8200       7.9        20       233        96
IR     2025250     91400   17.6700 -109.9600       7.6        33       201        94
IR     2025250     91400   17.7400 -110.0700       5.7        23       194        98
IR     2025250     91400   17.7000 -110.2400       5.8        31       176        99
IR     2025250     91400   17.6800 -110.3200       6.5        38       167        94
IR     2025250     91400   17.6500 -110.5400       8.8        69       148        98
IR     2025250     91400   17.6700 -110.5800       8.4        70       144       100
IR     2025250     91400   17.6600 -110.7300       7.1        71       141        99
IR     2025250     91400   17.7000 -110.8400       6.3        75       148        98
IR     2025250     91400   17.6300 -111.0200       7.0        72       164        83
IR     2025250     91400   17.7100 -111.0700       8.7        79       163        91
IR     2025250     91400   17.6700 -111.2500      11.0        77       159        96
IR     2025250     91400   17.6900 -111.3100      10.8        80       154       100
IR     2025250     91400   17.7000 -111.4500       8.9        76       140       100
IR     2025250     91400   17.6800 -111.5700       6.7        67       144        97
IR     2025250     91400   17.6400 -111.6300       6.6        63       147        92
IR     2025250     91400   17.6700 -111.7400       8.5        65       147        98
IR     2025250     91400   17.6300 -111.9600       7.3        60       148       100
IR     2025250     91400   17.6300 -112.0000       7.0        49       148       100
IR     2025250     91400   17.6000 -112.1900       6.5        35       139        98
IR     2025250     91400   17.6000 -112.2200       6.6        35       138        99
IR     2025250     91400   17.6000 -112.3300       7.1        22       133        99
IR     2025250     91400   17.6300 -112.4900       6.8        12       131        97
IR     2025250     91400   17.6300 -112.6500       5.6         4       132        99
IR     2025250     91400   17.6500 -112.6700       5.4         3       131        99
IR     2025250     91400   17.6600 -112.7800       4.4        10       131        99
IR     2025250     91400   17.6200 -113.0000       4.5         7       134       100
IR     2025250     91400   17.6200 -113.0200       4.2         9       133        99
IR     2025250     91400   17.5700 -113.2400       4.3         2       140       100
IR     2025250     91400   17.5700 -113.2600       4.5         4       140        99
IR     2025250     91400   17.6300 -113.3900       5.1         9       141        98
IR     2025250     91400   17.5800 -113.5100       6.1         9       142        92
IR     2025250     91400   17.6200 -113.6800       5.5         2       144       100
IR     2025250     91400   17.5700 -113.8000       5.2       358       147        97
IR     2025250     91400   17.5900 -113.8700       5.0       359       147        98
IR     2025250     91400   17.5500 -114.0400       4.8       348       159        95
IR     2025250     91400   17.6300 -114.1100       4.6       347       154        99
IR     2025250     91400   17.6200 -114.1800       4.9       342       162        99
IR     2025250     91400   17.6200 -114.2900       4.7       337       173        97
IR     2025250     91400   17.5400 -114.4200       5.4       334       181        97
IR     2025250     91400   17.5300 -114.6000       5.4       338       190        99
IR     2025250     91400   17.6100 -114.6800       4.9       330       194       100
IR     2025250     91400   17.5300 -114.8300       4.2       336       219        85
IR     2025250     91400   17.6000 -114.9900       4.2       315       214        90
IR     2025250     91400   17.5100 -116.2700       4.7        32       208        86
IR     2025250     91400   17.5500 -116.9200       4.0       359       198        99
IR     2025250     91400   17.5400 -117.3300       4.6        62       234        91
IR     2025250     91400   17.5200 -117.6000       9.2        38       230        94
IR     2025250     91400   17.5100 -117.6800       6.7        43       218        87
IR     2025250     91400   17.4900 -118.0100       4.5         3       216        98
IR     2025250     91400   17.4400 -118.1700       9.3       352       201        99
IR     2025250     91400   17.5200 -118.3100      11.8       357       198       100
IR     2025250     91400   17.4400 -118.3600       9.8       356       184        96
IR     2025250     91400   17.5000 -119.1200       9.3        18       186        83
IR     2025250     91400   17.4800 -119.3400      17.0        10       171        99
IR     2025250     91400   17.5900 -109.0600       6.2        87       219        99
IR     2025250     91400   17.6500 -109.2200       5.8        90       242        96
IR     2025250     91400   17.6700 -109.3100       6.2        79       244       100
IR     2025250     91400   17.5800 -109.4500       6.8        66       218        97
IR     2025250     91400   17.5800 -109.5000       7.0        63       215        97
IR     2025250     91400   17.6400 -109.6100       7.8        56       215        94
IR     2025250     91400   17.5900 -109.8400       8.7        22       200        89
IR     2025250     91400   17.5700 -109.9100       8.4        28       196        93
IR     2025250     91400   17.6500 -109.9700       7.8        33       200        94
IR     2025250     91400   17.6400 -110.1800       7.3        37       181       100
IR     2025250     91400   17.6400 -110.2800       7.2        43       172        99
IR     2025250     91400   17.5900 -110.3900       8.4        55       165        98
IR     2025250     91400   17.6300 -110.5400       9.2        70       149        97
IR     2025250     91400   17.6300 -110.5700       9.1        71       146        98
IR     2025250     91400   17.5400 -110.8000       6.0        79       153        99
IR     2025250     91400   17.5400 -110.9000       5.5        76       157        96
IR     2025250     91400   17.5900 -111.0300       6.7        66       164        90
IR     2025250     91400   17.6100 -111.0500       7.1        69       164        86
IR     2025250     91400   17.5300 -111.2800       8.9        70       161        96
IR     2025250     91400   17.5600 -111.3900       8.9        71       149        97
IR     2025250     91400   17.5800 -111.5000       7.6        64       139        87
IR     2025250     91400   17.6000 -111.5200       7.2        62       140        86
IR     2025250     91400   17.5600 -111.6700       6.7        61       152        84
IR     2025250     91400   17.5700 -111.7600       7.8        62       155        91
IR     2025250     91400   17.5100 -111.8900       7.2        67       154        97
IR     2025250     91400   17.5300 -112.0000       5.8        41       152        99
IR     2025250     91400   17.5800 -112.2000       6.4        30       141        97
IR     2025250     91400   17.5800 -112.2200       6.6        29       139        97
IR     2025250     91400   17.5800 -112.3400       7.4        18       134        97
IR     2025250     91400   17.5500 -112.4600       7.4        11       134        92
IR     2025250     91400   17.5100 -112.6800       7.4         7       139        96
IR     2025250     91400   17.5400 -112.7400       7.1         2       138        99
IR     2025250     91400   17.5200 -112.8300       7.0        13       139       100
IR     2025250     91400   17.5600 -112.9600       5.6        11       140       100
IR     2025250     91400   17.5500 -113.1300       5.1         4       141       100
IR     2025250     91400   17.5300 -113.2200       4.7       357       142        99
IR     2025250     91400   17.5500 -113.2600       4.9         1       141       100
IR     2025250     91400   17.5200 -113.4500       6.0         7       144        93
IR     2025250     91400   17.4600 -113.6000       7.0       349       147        95
IR     2025250     91400   17.4600 -113.6700       6.7       348       148        97
IR     2025250     91400   17.4800 -113.8000       5.7       350       153        89
IR     2025250     91400   17.5300 -113.8300       5.2       355       150        98
IR     2025250     91400   17.5300 -114.0400       5.0       347       161        95
IR     2025250     91400   17.5100 -114.0900       5.4       342       170        96
IR     2025250     91400   17.4400 -114.2800       6.4       344       177        94
IR     2025250     91400   17.4800 -114.3000       6.1       342       178        90
IR     2025250     91400   17.5200 -114.4000       5.7       338       181        95
IR     2025250     91400   17.5100 -114.6000       5.6       340       192        99
IR     2025250     91400   17.5100 -114.6300       5.7       340       195        99
IR     2025250     91400   17.4900 -114.8300       4.1       341       219        88
IR     2025250     91400   17.3900 -116.2500       5.8        24       207        99
IR     2025250     91400   17.3900 -116.3300       5.3        16       207        92
IR     2025250     91400   17.3600 -117.4900       5.4        43       246        68
IR     2025250     91400   17.4300 -117.7600       5.9        68       224        91
IR     2025250     91400   17.4100 -118.0200       4.4        12       216        89
IR     2025250     91400   17.4200 -118.1700       8.8       352       202        99
IR     2025250     91400   17.3400 -118.3100       6.5         5       186        94
IR     2025250     91400   17.3800 -118.3700       7.9         3       182        90
IR     2025250     91400   17.3300 -119.0400       8.3        28       201        72
IR     2025250     91400   17.4000 -119.1400      10.0        24       199        99
IR     2025250     91400   17.3400 -119.1900      12.4        23       190        83
IR     2025250     91400   17.3800 -119.3300      15.7        13       170        98
IR     2025250     91400   17.3600 -119.4200      16.7        13       168        96
IR     2025250     91400   17.5800 -108.9900       6.2        95       218       100
IR     2025250     91400   17.5800 -109.0400       6.1        88       219       100
IR     2025250     91400   17.5100 -109.2500       5.8        71       221        97
IR     2025250     91400   17.4900 -109.2800       6.2        71       218        96
IR     2025250     91400   17.4800 -109.4000       7.6        65       214       100
IR     2025250     91400   17.5600 -109.5300       7.5        58       208        98
IR     2025250     91400   17.5600 -109.6300       8.3        46       186        97
IR     2025250     91400   17.4700 -109.9600       7.6        22       193        96
IR     2025250     91400   17.5000 -110.0500       7.7        31       191        92
IR     2025250     91400   17.4600 -110.1300       7.9        35       187        97
IR     2025250     91400   17.4900 -110.4800       7.4        68       167        98
IR     2025250     91400   17.4500 -110.6100       6.2        74       164        97
IR     2025250     91400   17.4400 -110.7800       4.5        83       158        99
IR     2025250     91400   17.5200 -110.8800       5.1        80       156        98
IR     2025250     91400   17.4800 -110.9300       5.0        73       158        99
IR     2025250     91400   17.4300 -111.0600       6.0        56       161        93
IR     2025250     91400   17.5100 -111.1900       7.8        65       164        93
IR     2025250     91400   17.4500 -111.3600       8.3        64       159        99
IR     2025250     91400   17.4600 -111.4100       7.6        64       156        99
IR     2025250     91400   17.4400 -111.5800       6.9        48       153        91
IR     2025250     91400   17.5000 -111.6800       6.6        63       152        89
IR     2025250     91400   17.4100 -111.8400       9.3        67       153        93
IR     2025250     91400   17.4900 -111.9200       7.5        72       153        97
IR     2025250     91400   17.4600 -112.0800       6.7        30       151       100
IR     2025250     91400   17.4400 -112.1100       7.0        32       150       100
IR     2025250     91400   17.4800 -112.2400       8.0        17       144        99
IR     2025250     91400   17.4500 -112.4300      11.0        23       137        95
IR     2025250     91400   17.3900 -112.5400      10.6        39       140        91
IR     2025250     91400   17.4100 -112.6300       7.3        39       140        97
IR     2025250     91400   17.4600 -112.7800       5.6        22       141       100
IR     2025250     91400   17.4600 -112.8000       5.6        25       142       100
IR     2025250     91400   17.4500 -113.1200       5.4        16       147       100
IR     2025250     91400   17.4500 -113.2800       5.2         0       147        98
IR     2025250     91400   17.3700 -113.4600       5.7        14       151        95
IR     2025250     91400   17.4000 -113.5200       6.4         1       149        94
IR     2025250     91400   17.4400 -113.6300       7.0       346       148        97
IR     2025250     91400   17.4400 -113.7600       6.3       350       153        87
IR     2025250     91400   17.3600 -113.8500       7.1         0       161        93
IR     2025250     91400   17.3500 -113.9400       8.3         9       170        80
IR     2025250     91400   17.4300 -114.0800       7.0       352       174        96
IR     2025250     91400   17.3600 -114.2300       7.3       346       178       100
IR     2025250     91400   17.4200 -114.2600       6.7       345       177        98
IR     2025250     91400   17.3800 -114.3800       5.9       351       183        92
IR     2025250     91400   17.3400 -114.5700       4.3       356       195        95
IR     2025250     91400   17.3500 -114.6600       4.8       350       205        99
IR     2025250     91400   17.3700 -116.2300       5.6        22       207        99
IR     2025250     91400   17.3500 -116.2500       5.8        20       207        99
IR     2025250     91400   17.3100 -116.3700       5.8        13       208        91
IR     2025250     91400   17.2800 -116.8300       4.2       200       208        99
IR     2025250     91400   17.2700 -117.8300       4.4       119       218        98
IR     2025250     91400   17.2700 -118.0700       4.0        39       209        81
IR     2025250     91400   17.2400 -118.2600       4.3        25       197        90
IR     2025250     91400   17.2400 -118.2800       4.0        30       195        77
IR     2025250     91400   17.2400 -118.4300       5.3        39       179        65
IR     2025250     91400   17.2800 -118.5600       7.9        23       171        79
IR     2025250     91400   17.3100 -118.9800       4.8        47       200        66
IR     2025250     91400   17.3100 -119.0600       8.8        26       200        66
IR     2025250     91400   17.2600 -119.2000      11.5        17       187        73
IR     2025250     91400   17.4200 -109.0500       5.4        75       210        99
IR     2025250     91400   17.4300 -109.1500       5.9        82       210       100
IR     2025250     91400   17.4700 -109.2900       6.4        72       217        97
IR     2025250     91400   17.4700 -109.3100       6.8        72       216        98
IR     2025250     91400   17.4600 -109.4300       7.7        62       213        99
IR     2025250     91400   17.4600 -109.5800       7.6        47       188        97
IR     2025250     91400   17.3700 -109.9100       7.5        20       190        93
IR     2025250     91400   17.4500 -109.9600       7.7        20       192        98
IR     2025250     91400   17.4000 -110.1400       8.1        32       184        93
IR     2025250     91400   17.3800 -110.1700       8.3        33       181        86
IR     2025250     91400   17.4300 -110.5900       6.2        69       167        97
IR     2025250     91400   17.4300 -110.6100       6.1        71       166        96
IR     2025250     91400   17.3800 -110.7400       4.7        75       164        99
IR     2025250     91400   17.3400 -110.8700       4.1        74       161        97
IR     2025250     91400   17.4100 -111.0600       5.9        55       161        94
IR     2025250     91400   17.4100 -111.0900       6.2        56       161        94
IR     2025250     91400   17.3700 -111.2200       6.3        63       161        99
IR     2025250     91400   17.3800 -111.4200       7.7        56       156        98
IR     2025250     91400   17.3200 -111.4800       6.8        45       152        95
IR     2025250     91400   17.4000 -111.5800       7.6        46       151        95
IR     2025250     91400   17.3500 -111.7800       7.9        60       144        89
IR     2025250     91400   17.3300 -111.8500       9.4        64       136        93
IR     2025250     91400   17.3500 -111.9200       9.4        69       145        92
IR     2025250     91400   17.3000 -112.1200       8.3        68       146        93
IR     2025250     91400   17.3600 -112.2400       9.7        50       145        98
IR     2025250     91400   17.3400 -112.2700      10.6        52       143        98
IR     2025250     91400   17.3700 -112.4700      13.8        46       139        98
IR     2025250     91400   17.3700 -112.5200      12.6        46       140        95
IR     2025250     91400   17.2900 -112.7200      10.1        67       147        99
IR     2025250     91400   17.2900 -112.7700       9.0        72       148        99
IR     2025250     91400   17.3400 -112.8500       6.7        66       147        81
IR     2025250     91400   17.3600 -112.9800       8.0        56       148        83
IR     2025250     91400   17.2900 -113.1800       7.5        50       156        99
IR     2025250     91400   17.2900 -113.2000       7.4        51       156        99
IR     2025250     91400   17.2700 -113.4100       7.2        47       159        99
IR     2025250     91400   17.2700 -113.4300       6.8        43       160        98
IR     2025250     91400   17.3400 -113.5300       6.2         2       154       100
IR     2025250     91400   17.3200 -113.6700       6.7       352       159        96
IR     2025250     91400   17.3400 -113.8500       7.4         6       163        94
IR     2025250     91400   17.3300 -113.9200       8.4        11       170        83
IR     2025250     91400   17.3300 -113.9900       8.7        12       173        86
IR     2025250     91400   17.2900 -114.2000       7.6       350       178       100
IR     2025250     91400   17.3300 -114.2100       7.5       348       178       100
IR     2025250     91400   17.3200 -114.3900       5.6       355       183        91
IR     2025250     91400   17.3000 -114.4600       4.6       359       186        96
IR     2025250     91400   17.3200 -114.5700       4.2       356       196        95
IR     2025250     91400   17.2300 -114.7700       5.0       340       217        98
IR     2025250     91400   17.2300 -114.8400       4.7       340       220        92
IR     2025250     91400   17.2000 -116.1200       4.8        16       210        99
IR     2025250     91400   17.2700 -116.2200       5.2        24       209        98
IR     2025250     91400   17.2700 -116.3300       6.1        17       209        89
IR     2025250     91400   17.2600 -116.8100       4.3       198       208        96
IR     2025250     91400   17.2200 -117.6400       4.3        74       230        84
IR     2025250     91400   17.2200 -118.4200       5.1        44       181        68
IR     2025250     91400   17.1600 -118.5300       5.7        51       173        81
IR     2025250     91400   17.2000 -118.6500       5.6        34       173        92
IR     2025250     91400   17.1300 -118.7700       4.6        26       194        77
IR     2025250     91400   17.1300 -118.8100       4.2        25       197        74
IR     2025250     91400   17.1300 -119.2000       7.3         8       183        75
IR     2025250     91400   17.1400 -119.5100      14.7        16       175        94
IR     2025250     91400   17.3300 -109.2900       7.0        81       215        97
IR     2025250     91400   17.3400 -109.4100       8.1        77       216       100
IR     2025250     91400   17.2800 -109.5000       8.0        73       219       100
IR     2025250     91400   17.3600 -109.5500       7.7        47       211        97
IR     2025250     91400   17.2700 -109.7600       7.5        31       205        85
IR     2025250     91400   17.2700 -109.8600       7.2        23       197        85
IR     2025250     91400   17.3500 -109.9400       7.2        22       189        85
IR     2025250     91400   17.3200 -110.1400       8.0        28       182        80
IR     2025250     91400   17.3000 -110.2400       7.9        42       180        76
IR     2025250     91400   17.3400 -110.3000       7.1        44       177        81
IR     2025250     91400   17.2900 -110.4300       6.6        46       175        95
IR     2025250     91400   17.3100 -110.6100       4.9        38       172        99
IR     2025250     91400   17.3300 -110.6600       5.1        47       170       100
IR     2025250     91400   17.2800 -110.7900       4.1        67       171        99
IR     2025250     91400   17.3000 -111.0400       4.1        75       160        98
IR     2025250     91400   17.3100 -111.1300       5.3        69       160        96
IR     2025250     91400   17.2900 -111.2800       6.9        70       159        99
IR     2025250     91400   17.2800 -111.4400       7.9        50       153        66
IR     2025250     91400   17.2800 -111.6600       6.5        40       132        99
IR     2025250     91400   17.3000 -111.7000       6.2        43       131        98
IR     2025250     91400   17.2900 -111.8900       9.2        69       132        86
IR     2025250     91400   17.2900 -111.9600       9.7        75       136        93
IR     2025250     91400   17.2700 -112.0500       9.6        82       141        97
IR     2025250     91400   17.2400 -112.2000       7.7        78       142        98
IR     2025250     91400   17.2800 -112.2800      10.4        61       141       100
IR     2025250     91400   17.2000 -112.4400      12.6        55       142        99
IR     2025250     91400   17.2100 -112.5700      14.5        61       146        98
IR     2025250     91400   17.2100 -112.6900      12.7        66       149       100
IR     2025250     91400   17.2100 -112.7600      11.6        67       153        98
IR     2025250     91400   17.2200 -112.8700       8.5        64       156        97
IR     2025250     91400   17.1800 -113.0100       8.8        33       159        99
IR     2025250     91400   17.2100 -113.1900       8.6        51       159       100
IR     2025250     91400   17.1700 -113.2900      10.3        55       160       100
IR     2025250     91400   17.2500 -113.4100       7.9        53       161       100
IR     2025250     91400   17.2500 -113.4400       7.4        50       162        99
IR     2025250     91400   17.2400 -113.5500       6.4        21       162       100
IR     2025250     91400   17.2400 -113.7300       8.0        12       164        96
IR     2025250     91400   17.2200 -113.8300       9.1        20       169        99
IR     2025250     91400   17.1600 -113.9100       8.9        24       174       100
IR     2025250     91400   17.1900 -114.1000       7.8       359       180       100
IR     2025250     91400   17.2100 -114.1200       7.9       358       179        99
IR     2025250     91400   17.1900 -114.2400       5.9       350       181        99
IR     2025250     91400   17.2100 -114.7700       5.1       339       218        97
IR     2025250     91400   17.2100 -114.7900       5.1       339       219        95
IR     2025250     91400   17.1000 -116.0700       5.8         2       210        98
IR     2025250     91400   17.1400 -116.1300       6.0        15       211       100
IR     2025250     91400   17.1000 -116.2500       5.7        36       217        93
IR     2025250     91400   17.0900 -116.4300       6.2        20       225        99
IR     2025250     91400   17.1300 -116.5100       5.9         0       222        79
IR     2025250     91400   17.1300 -116.6000       4.3         3       218        82
IR     2025250     91400   17.1400 -117.8500       4.0        62       209        87
IR     2025250     91400   17.0600 -118.4800       4.7        54       178        65
IR     2025250     91400   17.0400 -118.5300       4.5        53       177        67
IR     2025250     91400   17.0800 -118.6500       4.7        34       181        92
IR     2025250     91400   17.1100 -118.7700       4.7        25       195        76
IR     2025250     91400   17.1100 -118.8200       4.4        23       197        71
IR     2025250     91400   17.0300 -118.9300       5.1        18       204        72
IR     2025250     91400   17.0300 -119.1500       4.1        21       191        79
IR     2025250     91400   17.0200 -119.4400      13.1         9       177        81
IR     2025250     91400   17.2100 -109.1300       5.1        49       195        92
IR     2025250     91400   17.2100 -109.3400       6.6        71       215        97
IR     2025250     91400   17.2400 -109.4100       7.5        77       221        99
IR     2025250     91400   17.2600 -109.5300       8.1        70       220       100
IR     2025250     91400   17.1800 -109.6200       8.0        60       222        97
IR     2025250     91400   17.2500 -109.7900       7.4        30       202        83
IR     2025250     91400   17.1700 -109.8600       7.1        35       201        80
IR     2025250     91400   17.1700 -110.0500       6.0        23       180        93
IR     2025250     91400   17.2400 -110.0800       6.8        22       181        95
IR     2025250     91400   17.2400 -110.2300       8.1        48       180        94
IR     2025250     91400   17.2400 -110.3900       7.9        56       181        98
IR     2025250     91400   17.2300 -110.4600       6.8        48       179        98
IR     2025250     91400   17.2300 -110.6600       5.3        33       175       100
IR     2025250     91400   17.1900 -110.6900       5.8        33       179       100
IR     2025250     91400   17.1600 -110.8100       5.0        57       177        97
IR     2025250     91400   17.1800 -110.9700       5.0        79       168        97
IR     2025250     91400   17.1400 -111.0500       5.5        77       167        96
IR     2025250     91400   17.1700 -111.1900       5.6        74       160        98
IR     2025250     91400   17.2100 -111.3700       9.3        65       157       100
IR     2025250     91400   17.1400 -111.4700       8.4        58       156        73
IR     2025250     91400   17.2000 -111.7400       7.2        55       125       100
IR     2025250     91400   17.1900 -111.9300       8.9        77       130        98
IR     2025250     91400   17.1500 -112.0800       9.4        84       138       100
IR     2025250     91400   17.1700 -112.1000       9.4        85       139       100
IR     2025250     91400   17.1000 -112.3200       9.0        61       145        87
IR     2025250     91400   17.1000 -112.3400       8.7        61       145        83
IR     2025250     91400   17.1800 -112.4400      11.9        55       143        98
IR     2025250     91400   17.1500 -112.6100      13.5        63       148        99
IR     2025250     91400   17.1700 -112.7200      12.9        64       153       100
IR     2025250     91400   17.1700 -112.7900      11.6        59       157       100
IR     2025250     91400   17.1600 -113.0000      10.1        30       159        99
IR     2025250     91400   17.1600 -113.0400       9.7        25       159       100
IR     2025250     91400   17.0800 -113.1700      13.3        32       158       100
IR     2025250     91400   17.1500 -113.2700      10.8        52       160       100
IR     2025250     91400   17.1100 -113.4400      10.5        54       169       100
IR     2025250     91400   17.0600 -113.7900       9.5        33       171        98
IR     2025250     91400   17.1200 -113.8900       8.7        27       174        99
IR     2025250     91400   17.0500 -114.0100       7.1         3       179        97
IR     2025250     91400   17.1300 -114.0700       6.9       356       180        99
IR     2025250     91400   17.1300 -114.1800       6.6       352       181       100
IR     2025250     91400   17.1100 -114.7400       5.2       334       230        99
IR     2025250     91400   17.0800 -116.0800       5.8         4       210        97
IR     2025250     91400   17.0000 -116.1800       5.4        34       216        75
IR     2025250     91400   17.0000 -116.2500       4.9        50       218        74
IR     2025250     91400   17.0700 -116.4300       6.0        22       225        98
IR     2025250     91400   17.0700 -116.4500       6.0        13       227        95
IR     2025250     91400   17.0700 -116.5800       6.0       359       222        96
IR     2025250     91400   16.9800 -116.9900       4.3       354       224        83
IR     2025250     91400   17.0400 -117.8700       6.3        56       208        96
IR     2025250     91400   16.9700 -118.0500       5.7        85       207        78
IR     2025250     91400   17.0100 -118.1700       4.1        69       206        80
IR     2025250     91400   17.0200 -118.5300       4.4        51       182        73
IR     2025250     91400   17.0200 -118.6400       4.0        33       185        88
IR     2025250     91400   17.0200 -118.7700       4.9        16       195        74
IR     2025250     91400   16.9700 -118.9200       5.6        26       203        87
IR     2025250     91400   16.9500 -119.0900       4.6        41       200        98
IR     2025250     91400   17.0100 -119.1500       4.1        23       193        82
IR     2025250     91400   16.9300 -119.3100      11.1        14       177       100
IR     2025250     91400   17.1700 -109.1100       5.3        58       180       100
IR     2025250     91400   17.1700 -109.1300       5.2        55       181       100
IR     2025250     91400   17.0900 -109.3700       5.8        42       213       100
IR     2025250     91400   17.0900 -109.4000       5.9        48       218       100
IR     2025250     91400   17.0800 -109.5900       7.6        65       226       100
IR     2025250     91400   17.1600 -109.7200       7.8        51       208        85
IR     2025250     91400   17.0700 -109.8600       6.2        36       204        98
IR     2025250     91400   17.0900 -109.8800       6.1        34       203        83
IR     2025250     91400   17.0600 -110.1000       5.2        11       203        96
IR     2025250     91400   17.0600 -110.1900       5.5        37       185        99
IR     2025250     91400   17.0600 -110.2400       6.0        46       192        99
IR     2025250     91400   17.0600 -110.3600       6.2        57       196       100
IR     2025250     91400   17.0900 -110.4700       6.5        55       195        98
IR     2025250     91400   17.0700 -110.6400       4.0        45       192        99
IR     2025250     91400   17.1300 -110.7500       5.0        48       180       100
IR     2025250     91400   17.0800 -110.8300       4.7        69       179        97
IR     2025250     91400   17.0800 -110.9900       6.4        83       172        93
IR     2025250     91400   17.0600 -111.0700       6.9        84       168        90
IR     2025250     91400   17.1100 -111.2000       6.4        77       163        98
IR     2025250     91400   17.0900 -111.3900       8.5        71       165        98
IR     2025250     91400   17.1000 -111.5000       8.0        57       159        70
IR     2025250     91400   17.0600 -111.7200       9.0        62       151       100
IR     2025250     91400   17.0600 -111.7700       8.4        60       140       100
IR     2025250     91400   17.0500 -111.8900       8.8        63       137        74
IR     2025250     91400   17.0100 -112.0100       8.6        57       146        85
IR     2025250     91400   17.0100 -112.1800       8.5        53       154        88
IR     2025250     91400   17.0600 -112.2800       8.4        57       147        88
IR     2025250     91400   17.0000 -112.3600       7.8        36       157        96
IR     2025250     91400   16.9900 -112.5500       8.8        52       151        98
IR     2025250     91400   17.0100 -112.6600      11.6        56       154        98
IR     2025250     91400   16.9900 -112.8000      13.9        53       160        99
IR     2025250     91400   17.0200 -112.9100      13.9        34       162        99
IR     2025250     91400   17.0000 -112.9300      14.2        32       162        99
IR     2025250     91400   17.0200 -113.0700      13.6        19       158        94
IR     2025250     91400   17.0600 -113.1800      13.3        33       158       100
IR     2025250     91400   17.0300 -113.2700      12.8        44       161       100
IR     2025250     91400   17.0100 -113.4100      11.4        54       170       100
IR     2025250     91400   16.9900 -113.5300       8.3        42       173        95
IR     2025250     91400   16.9600 -113.6900       8.7        34       172        98
IR     2025250     91400   16.9600 -113.8100       8.3        32       173        97
IR     2025250     91400   16.9600 -113.9200       6.5        15       175        99
IR     2025250     91400   17.0100 -114.0200       6.9       357       179        98
IR     2025250     91400   16.9500 -114.1200       6.8       349       179        99
IR     2025250     91400   16.9200 -115.4400       5.8        44       201        73
IR     2025250     91400   16.9200 -116.0800       5.3         5       215        91
IR     2025250     91400   16.9000 -116.9400       6.0         7       223        99
IR     2025250     91400   16.9600 -117.0100       4.6         1       233        90
IR     2025250     91400   16.9400 -117.7900       9.7        47       205        84
IR     2025250     91400   16.9400 -117.8800       8.6        56       205        96
IR     2025250     91400   16.9300 -118.2500       4.8        63       204        79
IR     2025250     91400   16.8800 -118.6200       4.7       356       193        75
IR     2025250     91400   16.8400 -118.7700       5.0       359       196        69
IR     2025250     91400   16.8800 -118.8700       5.6        39       198       100
IR     2025250     91400   16.8300 -119.0300       5.7        33       198        98
IR     2025250     91400   16.9100 -119.0800       5.6        38       200        98
IR     2025250     91400   16.9100 -119.2300       8.2        13       179        99
IR     2025250     91400   16.9100 -119.2900      10.7        14       177       100
IR     2025250     91400   17.0500 -109.1400       5.3        60       179       100
IR     2025250     91400   17.0100 -109.1700       5.5        43       182       100
IR     2025250     91400   17.0200 -109.5100       6.0        17       221        71
IR     2025250     91400   16.9800 -109.5900       5.5        29       227        65
IR     2025250     91400   17.0200 -109.6500       6.1        45       225        68
IR     2025250     91400   17.0300 -109.8600       5.5        38       207        99
IR     2025250     91400   17.0100 -109.8900       4.8        30       216        98
IR     2025250     91400   16.9900 -110.0400       4.6       353       234        89
IR     2025250     91400   17.0400 -110.1700       4.9        23       204        93
IR     2025250     91400   16.9600 -110.2600       4.3        33       216        99
IR     2025250     91400   17.0200 -110.3900       5.6        54       198       100
IR     2025250     91400   16.9500 -110.5200       5.4        54       198        98
IR     2025250     91400   16.9600 -110.9500       5.2        91       177        94
IR     2025250     91400   16.9800 -111.0600       7.2        87       172        92
IR     2025250     91400   16.9400 -111.0900       7.4        88       173        95
IR     2025250     91400   16.9300 -111.2600       9.4        81       170        96
IR     2025250     91400   16.9500 -111.4200       9.0        77       175        98
IR     2025250     91400   16.9600 -111.5100       8.2        67       177        99
IR     2025250     91400   17.0000 -111.5500       9.8        68       175        99
IR     2025250     91400   17.0000 -111.7600       9.8        59       168        98
IR     2025250     91400   16.9300 -111.8900       9.3        52       168        98
IR     2025250     91400   16.9500 -111.9100       9.7        56       157        88
IR     2025250     91400   16.9100 -112.1000       9.4        44       163        94
IR     2025250     91400   16.9100 -112.1900       8.9        32       166        97
IR     2025250     91400   16.9800 -112.3000       9.5        35       159        92
IR     2025250     91400   16.9800 -112.3600       8.0        31       158        92
IR     2025250     91400   16.9300 -112.5800       9.4        48       153        97
IR     2025250     91400   16.8900 -112.7000      13.0        54       157       100
IR     2025250     91400   16.9300 -112.8100      14.6        60       161       100
IR     2025250     91400   16.9300 -112.8300      14.5        58       162       100
IR     2025250     91400   16.9200 -113.0000      14.0        45       163        99
IR     2025250     91400   16.9000 -113.0700      12.3        41       160        98
IR     2025250     91400   16.8800 -113.2300      11.1        45       163        98
IR     2025250     91400   16.8900 -113.3700       9.6        40       172        98
IR     2025250     91400   16.8700 -113.4400       9.5        40       176        98
IR     2025250     91400   16.8700 -113.5700       9.4        32       176        79
IR     2025250     91400   16.8600 -113.7300       8.1        32       172        77
IR     2025250     91400   16.8600 -113.7600       7.7        32       172        77
IR     2025250     91400   16.8600 -113.8900       6.0        17       174        94
IR     2025250     91400   16.9300 -114.0400       6.0       347       178        99
IR     2025250     91400   16.9100 -114.1100       6.3       350       177        99
IR     2025250     91400   16.8400 -117.7200       8.9        52       205        77
IR     2025250     91400   16.8400 -117.9000       8.0        48       204        89
IR     2025250     91400   16.8400 -117.9200       7.6        54       204        89
IR     2025250     91400   16.7600 -118.1000       6.2        74       202        87
IR     2025250     91400   16.7500 -118.2300       6.5        78       201        92
IR     2025250     91400   16.8300 -118.2800       5.6        72       202        75
IR     2025250     91400   16.7400 -118.9500       7.2        35       195        99
IR     2025250     91400   16.7800 -118.9900       6.5        31       196        96
IR     2025250     91400   16.7700 -119.2700      10.6        10       176        96
IR     2025250     91400   16.8900 -109.3700       7.1        44       231        92
IR     2025250     91400   16.8900 -109.3900       7.0        42       229        98
IR     2025250     91400   16.9600 -109.5900       5.4        35       226        67
IR     2025250     91400   16.9000 -109.6800       5.2        54       260        80
IR     2025250     91400   16.9600 -109.7600       5.5        51       249        88
IR     2025250     91400   16.8800 -110.1600       4.5        14       236        76
IR     2025250     91400   16.9300 -110.5300       5.1        53       198        99
IR     2025250     91400   16.8400 -111.0200       4.5        79       179        95
IR     2025250     91400   16.8400 -111.1400       6.5        90       179        95
IR     2025250     91400   16.8800 -111.1500       7.7        87       176        97
IR     2025250     91400   16.8500 -111.2800       9.3        86       178        98
IR     2025250     91400   16.9100 -111.4500       9.3        82       179        94
IR     2025250     91400   16.9000 -111.5900       8.2        71       184        90
IR     2025250     91400   16.8600 -111.6700       7.1        67       186        91
IR     2025250     91400   16.8400 -111.8100       7.4        39       180        98
IR     2025250     91400   16.8900 -111.9400       8.6        45       171       100
IR     2025250     91400   16.8900 -112.0100       8.6        41       168        99
IR     2025250     91400   16.8900 -112.0800       8.9        42       166        96
IR     2025250     91400   16.8900 -112.2000       8.6        28       168        99
IR     2025250     91400   16.8800 -112.4100       9.0        10       161        88
IR     2025250     91400   16.8800 -112.5200       9.4        21       156        94
IR     2025250     91400   16.7900 -112.6300      13.2        37       154        99
IR     2025250     91400   16.7900 -112.6800      13.9        43       156        98
IR     2025250     91400   16.8300 -112.8100      16.3        62       163       100
IR     2025250     91400   16.7800 -113.0000      15.2        63       171        96
IR     2025250     91400   16.8600 -113.0300      13.4        54       169       100
IR     2025250     91400   16.7800 -113.2300      11.0        47       177        95
IR     2025250     91400   16.7800 -113.2500      10.8        45       177        95
IR     2025250     91400   16.7900 -113.3600      10.8        39       178        97
IR     2025250     91400   16.7900 -113.5400      11.2        32       176        87
IR     2025250     91400   16.8100 -113.6800      10.5        29       172        78
IR     2025250     91400   16.8300 -113.7000       9.7        29       172        75
IR     2025250     91400   16.7800 -113.8400       7.4        21       173        77
IR     2025250     91400   16.8000 -113.9700       4.7       348       174        90
IR     2025250     91400   16.8400 -114.0300       5.0       348       175        88
IR     2025250     91400   16.7500 -115.2500       7.2        25       196        98
IR     2025250     91400   16.7000 -116.4200       5.4       360       235        99
IR     2025250     91400   16.7100 -116.8400       4.1        14       233       100
IR     2025250     91400   16.7100 -116.8800       5.5         6       233        99
IR     2025250     91400   16.7600 -117.0700       6.6        11       227        90
IR     2025250     91400   16.7600 -117.0900       6.1        11       228        84
IR     2025250     91400   16.7500 -117.7600       6.3        52       205        64
IR     2025250     91400   16.7200 -118.1300       5.8        73       201        89
IR     2025250     91400   16.6600 -118.2400       4.9        65       198        94
IR     2025250     91400   16.6600 -118.7300       5.8         2       194        72
IR     2025250     91400   16.6800 -118.8100       6.3        13       194        86
IR     2025250     91400   16.7000 -118.9400       7.8        29       193        98
IR     2025250     91400   16.6900 -119.3600      15.9        18       175        95
IR     2025250     91400   16.8500 -109.4300       6.9        50       235        99
IR     2025250     91400   16.7800 -109.6100       6.9        79       251        98
IR     2025250     91400   16.8000 -109.7200       5.9        71       258        97
IR     2025250     91400   16.7900 -110.0600       8.3        70       230        61
IR     2025250     91400   16.8200 -110.2000       5.1        41       234        98
IR     2025250     91400   16.8200 -110.2200       5.1        39       234       100
IR     2025250     91400   16.8000 -110.3400       5.1        36       232        98
IR     2025250     91400   16.8000 -111.0000       4.2        68       180       100
IR     2025250     91400   16.8200 -111.1200       5.8        88       181        98
IR     2025250     91400   16.7500 -111.2500       7.5        86       184        99
IR     2025250     91400   16.7500 -111.3900       9.0        92       186        94
IR     2025250     91400   16.7300 -111.4400       8.9        96       188        96
IR     2025250     91400   16.7700 -111.5300       9.6        90       189        94
IR     2025250     91400   16.8000 -111.6800       6.6        72       189        98
IR     2025250     91400   16.7800 -111.8500       6.8        36       185       100
IR     2025250     91400   16.7800 -111.8700       6.6        32       184       100
IR     2025250     91400   16.7500 -112.0200       5.3         7       180       100
IR     2025250     91400   16.7900 -112.2000       6.9       353       173        96
IR     2025250     91400   16.7300 -112.2800       8.3       336       170        87
IR     2025250     91400   16.7400 -112.4300      11.5         0       160        83
IR     2025250     91400   16.7600 -112.5000      13.0        11       155        94
IR     2025250     91400   16.7700 -112.6300      13.5        36       154        99
IR     2025250     91400   16.7700 -112.6800      14.2        42       156        98
IR     2025250     91400   16.7300 -112.9000      16.8        61       168        97
IR     2025250     91400   16.7100 -112.9200      16.5        59       169       100
IR     2025250     91400   16.6800 -113.0900      14.8        48       176       100
IR     2025250     91400   16.7600 -113.2100      11.2        45       177        96
IR     2025250     91400   16.6800 -113.3600      13.1        31       179        99
IR     2025250     91400   16.7000 -113.4000      12.5        31       179       100
IR     2025250     91400   16.7100 -113.5800      12.2        30       176        99
IR     2025250     91400   16.7500 -113.6600      12.5        28       171        93
IR     2025250     91400   16.6700 -113.7700      10.5        29       176        97
IR     2025250     91400   16.7400 -113.8200       8.3        25       173        82
IR     2025250     91400   16.7400 -114.0500       4.4         0       175        67
IR     2025250     91400   16.6500 -114.2700       9.2        34       194        92
IR     2025250     91400   16.7100 -115.0100       7.3         9       195        99
IR     2025250     91400   16.6900 -115.7700       7.3        24       213        75
IR     2025250     91400   16.6800 -116.4500       5.9         2       233        97
IR     2025250     91400   16.6700 -116.8900       5.4         5       235       100
IR     2025250     91400   16.6400 -117.0400       5.4       359       232        99
IR     2025250     91400   16.5900 -117.7400       5.6        46       204        78
IR     2025250     91400   16.6400 -118.0700       4.8        42       203        96
IR     2025250     91400   16.5600 -118.2200       5.7        48       197       100
IR     2025250     91400   16.5700 -118.6400       6.4        13       194        94
IR     2025250     91400   16.5900 -118.7400       7.3        14       193        83
IR     2025250     91400   16.5700 -118.7700       8.1        18       192        80
IR     2025250     91400   16.6000 -118.9100       9.2         9       186        93
IR     2025250     91400   16.5800 -119.0600      12.3         8       175        95
IR     2025250     91400   16.5400 -119.1100      13.5         8       172        97
IR     2025250     91400   16.5400 -119.2800      16.3        17       173       100
IR     2025250     91400   16.5700 -119.3200      15.9        19       174       100
IR     2025250     91400   16.5300 -119.4300      17.6        18       173        94
IR     2025250     91400   16.5700 -119.5900      16.3        20       171        66
IR     2025250     91400   16.7700 -109.2000       5.6        39       233        75
IR     2025250     91400   16.7700 -109.2200       5.6        40       234        78
IR     2025250     91400   16.7700 -109.4400       6.8        71       243        94
IR     2025250     91400   16.7600 -109.5400       7.4        79       248        99
IR     2025250     91400   16.7600 -109.6400       6.9        81       252        99
IR     2025250     91400   16.7600 -109.8000       6.5        74       251        74
IR     2025250     91400   16.7400 -109.8300       7.1        76       246        66
IR     2025250     91400   16.7300 -109.9800      10.3        79       230        72
IR     2025250     91400   16.7500 -110.1400       8.8        71       214        89
IR     2025250     91400   16.6800 -110.2000       9.7        70       209        96
IR     2025250     91400   16.7400 -110.3100       6.2        46       233        99
IR     2025250     91400   16.6600 -111.0300       4.8        61       187        98
IR     2025250     91400   16.7200 -111.1900       6.2        82       187        99
IR     2025250     91400   16.6900 -111.3100       7.5        94       188        99
IR     2025250     91400   16.7100 -111.4400       8.4        99       188        97
IR     2025250     91400   16.7100 -111.4700       8.4        99       189        96
IR     2025250     91400   16.6600 -111.6600       7.8        83       193        92
IR     2025250     91400   16.6600 -111.7100       6.3        62       192        96
IR     2025250     91400   16.6200 -111.9300       6.6        22       188        91
IR     2025250     91400   16.6200 -111.9500       6.1        14       187        90
IR     2025250     91400   16.6300 -112.1600       4.1       331       179        99
IR     2025250     91400   16.6500 -112.1800       4.4       322       177        97
IR     2025250     91400   16.6800 -112.3800       8.8       350       163        89
IR     2025250     91400   16.6000 -112.4100       8.0         3       162        96
IR     2025250     91400   16.6000 -112.5300       9.8        22       153        96
IR     2025250     91400   16.6000 -112.6700       7.6        39       159       100
IR     2025250     91400   16.5900 -112.8500      10.7        61       166        97
IR     2025250     91400   16.5900 -112.9700      14.3        49       173       100
IR     2025250     91400   16.6300 -113.0300      14.5        45       175       100
IR     2025250     91400   16.6400 -113.3200      14.4        32       178        95
IR     2025250     91400   16.6000 -113.4400      14.7        36       177       100
IR     2025250     91400   16.6500 -113.6100      12.8        32       176        99
IR     2025250     91400   16.6500 -113.7300      11.9        30       175        98
IR     2025250     91400   16.6500 -113.7500      11.4        30       176        97
IR     2025250     91400   16.5800 -113.9400       7.8        32       180        96
IR     2025250     91400   16.6400 -113.9800       5.8        22       179        91
IR     2025250     91400   16.5800 -114.1000       8.2        40       184        98
IR     2025250     91400   16.5500 -114.2800      11.9        32       203        91
IR     2025250     91400   16.5200 -115.7300       9.8        34       195        95
IR     2025250     91400   16.5500 -115.9000       8.2        24       201       100
IR     2025250     91400   16.5700 -116.8800       4.2         3       243       100
IR     2025250     91400   16.4900 -117.0200       6.0         2       242        96
IR     2025250     91400   16.4900 -117.1100       4.8         7       240        95
IR     2025250     91400   16.4700 -117.7600       6.7        27       206        83
IR     2025250     91400   16.4700 -117.8900       6.0        14       205        91
IR     2025250     91400   16.4600 -118.0600       5.5        11       201        92
IR     2025250     91400   16.4600 -118.1700       6.4        35       199        99
IR     2025250     91400   16.5400 -118.2400       5.6        44       196       100
IR     2025250     91400   16.4600 -118.3800       5.2        37       194       100
IR     2025250     91400   16.4900 -118.6300       7.6        26       197        95
IR     2025250     91400   16.4900 -118.7100       9.7        29       194        99
IR     2025250     91400   16.5300 -118.8200      10.1        16       187        94
IR     2025250     91400   16.4800 -118.9700      13.2         2       172        99
IR     2025250     91400   16.5200 -119.0900      13.2         7       171        99
IR     2025250     91400   16.4600 -119.2100      15.9        14       170        99
IR     2025250     91400   16.5000 -119.2400      16.8        16       171       100
IR     2025250     91400   16.5100 -119.4100      17.8        18       172        96
IR     2025250     91400   16.5100 -119.4900      15.7        17       172        70
IR     2025250     91400   16.5100 -119.6000      16.2        19       171        65
IR     2025250     91400   16.6700 -109.3900       5.9        84       244        89
IR     2025250     91400   16.5800 -109.5800       5.5        71       243        94
IR     2025250     91400   16.5800 -109.6700       5.5        77       243        92
IR     2025250     91400   16.6300 -109.9500       9.7        86       208        83
IR     2025250     91400   16.6200 -110.2600       8.8        62       209        95
IR     2025250     91400   16.6400 -110.2800       8.3        56       214        98
IR     2025250     91400   16.5500 -110.6800       4.2       350       200        99
IR     2025250     91400   16.5600 -111.0300       4.3        77       190        82
IR     2025250     91400   16.5400 -111.1000       5.5        87       192        78
IR     2025250     91400   16.5600 -111.2200       6.1        94       192        99
IR     2025250     91400   16.5500 -111.4300       4.1       102       195        92
IR     2025250     91400   16.5700 -111.4500       4.6       101       194        96
IR     2025250     91400   16.5300 -111.6200       5.5       100       196        78
IR     2025250     91400   16.6000 -111.8900       8.1        34       189        84
IR     2025250     91400   16.5700 -112.0100       6.1        17       186        88
IR     2025250     91400   16.5500 -112.2600       4.9       332       176        97
IR     2025250     91400   16.5400 -112.4500       7.0        13       165        97
IR     2025250     91400   16.5000 -112.5700       8.4        37       167       100
IR     2025250     91400   16.5800 -112.6500       6.9        36       160       100
IR     2025250     91400   16.5800 -112.7000       6.8        41       162        99
IR     2025250     91400   16.5100 -112.8900       9.1        54       170        88
IR     2025250     91400   16.5100 -112.9400      11.8        51       173        98
IR     2025250     91400   16.5500 -113.5400      12.4        37       177        98
IR     2025250     91400   16.5100 -113.5700      12.1        37       178        95
IR     2025250     91400   16.5500 -113.6800      13.4        33       178        94
IR     2025250     91400   16.4700 -113.9000      11.6        37       183        98
IR     2025250     91400   16.5400 -113.9300       8.9        36       181        98
IR     2025250     91400   16.5200 -114.0400       8.3        45       185        95
IR     2025250     91400   16.4600 -114.2300      14.3        33       204        96
IR     2025250     91400   16.5200 -114.2700      12.4        33       204        97
IR     2025250     91400   16.4800 -114.9000       6.3       354       195        99
IR     2025250     91400   16.5000 -115.7100       9.0        33       192        94
IR     2025250     91400   16.5000 -115.7800      10.2        35       188        97
IR     2025250     91400   16.4500 -115.9600       9.4        26       190       100
IR     2025250     91400   16.4700 -116.0700       7.7        16       196        99
IR     2025250     91400   16.4700 -116.0900       7.3        13       196        99
IR     2025250     91400   16.4500 -116.2900       8.8         3       197        99
IR     2025250     91400   16.4000 -116.4100       9.5         2       193        96
IR     2025250     91400   16.4800 -116.5200       7.0         6       218        99
IR     2025250     91400   16.4200 -116.6900       5.0         8       244        99
IR     2025250     91400   16.4300 -116.8400       4.9         6       244        99
IR     2025250     91400   16.4500 -116.8500       5.0         4       244        99
IR     2025250     91400   16.4600 -117.5400       4.9        54       209        92
IR     2025250     91400   16.4600 -117.5700       5.0        49       208        94
IR     2025250     91400   16.4100 -117.7400       6.9        38       208        71
IR     2025250     91400   16.3700 -117.7900       6.3        39       210        69
IR     2025250     91400   16.4500 -117.9100       6.1        12       205        96
IR     2025250     91400   16.4400 -118.0600       5.6         9       200        91
IR     2025250     91400   16.3600 -118.2000       5.1        34       199        95
IR     2025250     91400   16.3600 -118.2200       5.2        38       199        93
IR     2025250     91400   16.4000 -118.3200       5.0        48       196       100
IR     2025250     91400   16.4300 -118.6600       8.9        30       200        99
IR     2025250     91400   16.4300 -118.7200      11.2        29       197        99
IR     2025250     91400   16.3500 -118.9200      15.5        19       178        98
IR     2025250     91400   16.4100 -118.9600      14.7        11       172        96
IR     2025250     91400   16.3600 -119.2400      15.9        15       166        99
IR     2025250     91400   16.3400 -119.3900      17.1        16       167        99
IR     2025250     91400   16.3700 -119.5300      16.7        18       169        97
IR     2025250     91400   16.3900 -119.6400      17.5        24       169        83
IR     2025250     91400   16.5500 -109.2700       4.2        91       248        93
IR     2025250     91400   16.4900 -109.4800       4.3        68       243        73
IR     2025250     91400   16.5600 -109.6100       5.2        66       242        91
IR     2025250     91400   16.5000 -109.6700       4.8        56       235        89
IR     2025250     91400   16.5200 -109.8600       5.4        83       214        86
IR     2025250     91400   16.5200 -109.8800       5.9        85       213        87
IR     2025250     91400   16.5500 -110.0900      11.3        87       204        93
IR     2025250     91400   16.5500 -110.1800      10.4        82       206        97
IR     2025250     91400   16.4800 -110.3400       8.1        61       210        97
IR     2025250     91400   16.4600 -110.3700       7.6        57       213        99
IR     2025250     91400   16.5200 -110.5700       6.3       357       214        98
IR     2025250     91400   16.5300 -110.6800       4.3       351       200        99
IR     2025250     91400   16.4500 -110.7200       5.4         2       206        97
IR     2025250     91400   16.5200 -111.0900       5.2        85       193        77
IR     2025250     91400   16.4400 -111.2700       4.6        90       199        92
IR     2025250     91400   16.4900 -111.3200       5.3        95       196        97
IR     2025250     91400   16.4700 -111.6800       4.6        97       197        76
IR     2025250     91400   16.4400 -111.8500       8.5        53       192        90
IR     2025250     91400   16.4800 -111.9800       8.6        41       188        94
IR     2025250     91400   16.5000 -112.0000       7.9        37       187        94
IR     2025250     91400   16.4400 -112.4400       6.5        24       175        95
IR     2025250     91400   16.4800 -112.5500       8.8        37       169        99
IR     2025250     91400   16.4800 -112.5800       8.6        39       169       100
IR     2025250     91400   16.3900 -112.8400       9.8        40       173        93
IR     2025250     91400   16.3900 -112.9400      11.0        38       176        97
IR     2025250     91400   16.4500 -113.1100      11.1        18       177        86
IR     2025250     91400   16.3900 -113.7700      13.6        31       185        98
IR     2025250     91400   16.4500 -113.9000      11.9        37       184        99
IR     2025250     91400   16.3800 -114.0900      11.7        34       194       100
IR     2025250     91400   16.4000 -114.1100      11.9        35       194       100
IR     2025250     91400   16.4400 -114.2400      14.3        33       205        93
IR     2025250     91400   16.3700 -115.4300       4.8         1       199        94
IR     2025250     91400   16.3300 -115.5000       5.5       360       194        90
IR     2025250     91400   16.3200 -115.6500       4.8         7       182        74
IR     2025250     91400   16.3200 -115.8100       7.0        32       182        98
IR     2025250     91400   16.4000 -115.9000       9.5        32       187        99
IR     2025250     91400   16.3900 -115.9900       9.7        29       189        96
IR     2025250     91400   16.3500 -116.0400       8.4        32       187        94
IR     2025250     91400   16.3500 -116.1700       8.5        13       187       100
IR     2025250     91400   16.3700 -116.3500       9.6         4       190        99
IR     2025250     91400   16.3800 -116.3900       9.7         3       190        98
IR     2025250     91400   16.3600 -116.5700       7.5         4       200       100
IR     2025250     91400   16.3700 -116.8500       6.2         6       230        98
IR     2025250     91400   16.3300 -117.0000       5.9         2       222       100
IR     2025250     91400   16.2800 -117.5900      11.6        45       210        85
IR     2025250     91400   16.3100 -117.8000       5.1        52       211        65
IR     2025250     91400   16.2700 -117.9600       4.1        22       208        70
IR     2025250     91400   16.3100 -118.0600       4.2        12       201        83
IR     2025250     91400   16.3400 -118.2000       4.8        35       199        93
IR     2025250     91400   16.2600 -118.3900       5.7        62       200        90
IR     2025250     91400   16.3000 -118.4200       5.8        61       198       100
IR     2025250     91400   16.2500 -118.7300      10.7        21       186        98
IR     2025250     91400   16.3100 -118.8500      17.0        27       182        91
IR     2025250     91400   16.3100 -118.9900      15.6        19       174        91
IR     2025250     91400   16.3100 -119.0200      15.5        19       173        91
IR     2025250     91400   16.2500 -119.1300      16.2        17       168        98
IR     2025250     91400   16.2400 -119.2600      17.1        14       165       100
IR     2025250     91400   16.3000 -119.4200      17.9        15       167        96
IR     2025250     91400   16.2600 -119.5100      18.4        20       167        89
IR     2025250     91400   16.2400 -119.5500      18.5        27       169        95
IR     2025250     91400   16.4700 -109.3400       4.3        78       247        91
IR     2025250     91400   16.4500 -109.5100       4.3        62       239        80
IR     2025250     91400   16.4300 -109.5400       4.3        54       236        83
IR     2025250     91400   16.4600 -109.7500       4.4        55       215       100
IR     2025250     91400   16.4600 -109.8900       4.7        75       213        93
IR     2025250     91400   16.4500 -110.0100       7.9        84       208        92
IR     2025250     91400   16.4500 -110.2300       9.5        82       208        97
IR     2025250     91400   16.4300 -110.2800       8.9        78       209        95
IR     2025250     91400   16.4400 -110.3700       7.5        57       213        98
IR     2025250     91400   16.3600 -110.6000       7.9        15       215       100
IR     2025250     91400   16.4100 -110.7100       6.6         6       208        98
IR     2025250     91400   16.4300 -110.7300       5.9         4       208        97
IR     2025250     91400   16.4100 -110.9200       4.1        20       200        92
IR     2025250     91400   16.3800 -111.7600       5.1        81       197        90
IR     2025250     91400   16.4000 -111.8500       8.2        57       193        91
IR     2025250     91400   16.3400 -112.0000      10.2        52       190       100
IR     2025250     91400   16.3200 -112.1000      10.4        54       189       100
IR     2025250     91400   16.3700 -112.1600       7.0        48       185        89
IR     2025250     91400   16.3700 -112.3700       4.7        19       181        94
IR     2025250     91400   16.3000 -112.5900      11.7        44       178        96
IR     2025250     91400   16.3400 -112.6500      11.5        40       175        96
IR     2025250     91400   16.3600 -112.8000      10.9        41       174       100
IR     2025250     91400   16.3800 -112.8200      15.0        46       174        60
IR     2025250     91400   16.2900 -113.0000       7.9        30       181       100
IR     2025250     91400   16.3300 -113.0800       6.6        18       179        92
IR     2025250     91400   16.3700 -113.1700       8.4         8       177       100
IR     2025250     91400   16.2800 -113.3900       6.5        35       179        99
IR     2025250     91400   16.3000 -113.4100       7.6        31       179       100
IR     2025250     91400   16.2800 -113.5900      13.6        26       182        98
IR     2025250     91400   16.3500 -113.7100      15.6        29       183        98
IR     2025250     91400   16.2700 -113.7500      14.4        32       187        99
IR     2025250     91400   16.2700 -113.8600      12.5        32       191       100
IR     2025250     91400   16.2700 -114.0400      11.3        29       195       100
IR     2025250     91400   16.3000 -114.1500      11.3        27       206        99
IR     2025250     91400   16.3400 -114.1900      11.9        30       207        98
IR     2025250     91400   16.2500 -115.3600       7.0       359       203       100
IR     2025250     91400   16.3100 -115.4100       6.2         4       199        90
IR     2025250     91400   16.2500 -115.6000       6.5        13       184        85
IR     2025250     91400   16.2300 -115.6500       7.1        19       181        93
IR     2025250     91400   16.2200 -115.8500       6.9        29       187        99
IR     2025250     91400   16.2200 -115.9600       7.0        29       189        93
IR     2025250     91400   16.2400 -116.0400       6.5        31       187        93
IR     2025250     91400   16.2100 -116.1700       7.7        25       184        82
IR     2025250     91400   16.2300 -116.1900       7.8        23       183        90
IR     2025250     91400   16.2500 -116.3900       9.7         6       178       100
IR     2025250     91400   16.2300 -116.4100       9.9         4       177       100
IR     2025250     91400   16.2200 -116.5400       9.2       360       181        98
IR     2025250     91400   16.2200 -116.9300       7.6         4       204       100
IR     2025250     91400   16.2000 -116.9600       6.6         4       203       100
IR     2025250     91400   16.1800 -117.5000      11.6        26       210        99
IR     2025250     91400   16.2200 -118.3100       4.5        55       202        91
IR     2025250     91400   16.2400 -118.3700       5.4        62       201        89
IR     2025250     91400   16.2200 -118.5000       5.3        50       197       100
IR     2025250     91400   16.2400 -118.6000       4.5        33       194        92
IR     2025250     91400   16.2100 -118.8600      15.3        21       179        97
IR     2025250     91400   16.1700 -118.9500      15.9        22       177        99
IR     2025250     91400   16.1500 -119.1400      16.3        19       169       100
IR     2025250     91400   16.1500 -119.1600      16.4        19       168       100
IR     2025250     91400   16.1400 -119.3300      17.4        20       165       100
IR     2025250     91400   16.1400 -119.4600      18.0        26       169        86
IR     2025250     91400   16.1400 -119.4800      18.1        26       171        86
IR     2025250     91400   16.2200 -119.5700      18.7        30       173        96
IR     2025250     91400   16.3200 -109.2500       4.7        84       247        79
IR     2025250     91400   16.2900 -109.3300       4.7        78       247        84
IR     2025250     91400   16.3200 -109.6600       4.8         7       210        82
IR     2025250     91400   16.3600 -109.7500       5.5        26       210        98
IR     2025250     91400   16.3000 -109.9000       5.8        22       210        94
IR     2025250     91400   16.3200 -109.9200       5.6        34       211        92
IR     2025250     91400   16.3100 -110.0900       6.0        63       213        92
IR     2025250     91400   16.3100 -110.2100       7.8        79       214        94
IR     2025250     91400   16.3500 -110.3200       8.6        75       214        97
IR     2025250     91400   16.2600 -110.4100       7.8        65       218        99
IR     2025250     91400   16.3400 -110.6100       8.0        16       215       100
IR     2025250     91400   16.3400 -110.6300       8.2        16       215       100
IR     2025250     91400   16.2700 -110.7800       8.4        28       211        96
IR     2025250     91400   16.2900 -110.9400       5.4        19       208        99
IR     2025250     91400   16.2900 -111.7600       4.3        78       200       100
IR     2025250     91400   16.2400 -111.8600       7.0        58       198        99
IR     2025250     91400   16.3000 -111.9700      10.3        50       192        99
IR     2025250     91400   16.3000 -112.0800      14.8        52       190        64
IR     2025250     91400   16.2800 -112.1300      11.7        49       190        99
IR     2025250     91400   16.2100 -112.3300       8.7        46       188        96
IR     2025250     91400   16.2300 -112.3700       8.0        44       186        94
IR     2025250     91400   16.2800 -112.5700      10.9        45       179        96
IR     2025250     91400   16.2800 -112.6400      12.7        45       178        98
IR     2025250     91400   16.2200 -112.7800      12.9        50       180        96
IR     2025250     91400   16.2400 -112.8300      12.6        49       181        91
IR     2025250     91400   16.2500 -113.0100       5.3        25       183        98
IR     2025250     91400   16.2400 -113.6000      12.4        28       182       100
IR     2025250     91400   16.1800 -113.6800      10.5        33       186        99
IR     2025250     91400   16.2300 -113.7300      12.9        32       188       100
IR     2025250     91400   16.1900 -113.9200      10.4        34       193       100
IR     2025250     91400   16.2100 -114.0500      10.9        31       196       100
IR     2025250     91400   16.2400 -114.0900      11.5        28       198        98
IR     2025250     91400   16.1300 -115.4900       8.5         8       191        95
IR     2025250     91400   16.1300 -115.6600      10.3        22       181        98
IR     2025250     91400   16.1300 -115.7300       9.0        23       183        98
IR     2025250     91400   16.1200 -115.9000       7.2        21       192        98
IR     2025250     91400   16.1800 -115.9400       7.4        25       190        94
IR     2025250     91400   16.1200 -116.0800       6.9        23       191        74
IR     2025250     91400   16.1900 -116.1800       8.0        26       184        78
IR     2025250     91400   16.1300 -116.2500       9.2        24       184        76
IR     2025250     91400   16.1900 -116.4400      11.0       359       176        99
IR     2025250     91400   16.1700 -116.5500      10.1       359       178       100
IR     2025250     91400   16.1100 -116.6000      10.3         2       180        97
IR     2025250     91400   16.1400 -116.8400       8.5         7       200        94
IR     2025250     91400   16.1800 -116.9600       6.3         6       203       100
IR     2025250     91400   16.0900 -117.4500       8.7        37       210        92
IR     2025250     91400   16.1200 -117.6400      12.1        33       208        99
IR     2025250     91400   16.0800 -117.7100      11.0        24       197        99
IR     2025250     91400   16.1100 -117.9800       9.0        11       203        86
IR     2025250     91400   16.1100 -118.1100       5.4        20       205        84
IR     2025250     91400   16.1300 -118.2100       4.6        32       208        86
IR     2025250     91400   16.1500 -118.3400       5.4        44       203        91
IR     2025250     91400   16.0700 -118.4100       5.5        42       203        92
IR     2025250     91400   16.0600 -118.5200       5.8        30       200        89
IR     2025250     91400   16.1400 -118.5900       4.8        22       193        92
IR     2025250     91400   16.0600 -118.7100      10.2        18       180        96
IR     2025250     91400   16.0700 -118.9000      14.4        20       177       100
IR     2025250     91400   16.0700 -118.9600      14.6        21       177       100
IR     2025250     91400   16.0800 -119.4900      18.1        30       179        91
IR     2025250     91400   16.0800 -119.5100      18.2        32       180        94
IR     2025250     91400   16.0800 -119.6600      18.5        42       181        94
IR     2025250     91400   16.2600 -109.2400       4.0        83       248        72
IR     2025250     91400   16.1800 -109.7100       4.5       334       211        74
IR     2025250     91400   16.2400 -109.8400       6.1       343       208        70
IR     2025250     91400   16.2600 -109.9800       5.1        21       210        95
IR     2025250     91400   16.2500 -110.1300       4.7        52       214        95
IR     2025250     91400   16.2500 -110.2000       6.0        69       215        97
IR     2025250     91400   16.1600 -110.5000       6.9        52       220        99
IR     2025250     91400   16.1600 -110.7100       7.9        34       218        96
IR     2025250     91400   16.2300 -110.7700       8.8        31       214        96
IR     2025250     91400   16.1500 -110.9500       6.7        36       211        99
IR     2025250     91400   16.1700 -111.8100       6.8        54       204        99
IR     2025250     91400   16.1200 -112.0200      13.7        49       198        94
IR     2025250     91400   16.1200 -112.0900      16.6        48       196        89
IR     2025250     91400   16.1400 -112.2000      13.7        47       193        99
IR     2025250     91400   16.1900 -112.3100       9.5        47       189        96
IR     2025250     91400   16.1500 -112.4800       7.1        54       186        91
IR     2025250     91400   16.1300 -112.6000       7.6        53       184        99
IR     2025250     91400   16.1200 -112.6900      10.4        51       184        99
IR     2025250     91400   16.1000 -112.7800      10.0        51       189       100
IR     2025250     91400   16.1200 -112.9400       4.3        63       191        92
IR     2025250     91400   16.0900 -113.2400       4.3       169       192        96
IR     2025250     91400   16.0800 -113.6300       7.5        42       191        94
IR     2025250     91400   16.1500 -113.8800       9.3        35       193       100
IR     2025250     91400   16.1100 -115.4700       7.2         4       195       100
IR     2025250     91400   16.0900 -115.5400       8.5        15       183        96
IR     2025250     91400   16.0500 -115.7000      10.9        23       182       100
IR     2025250     91400   16.0700 -115.8000       9.5        23       191        99
IR     2025250     91400   16.0600 -115.9100       7.2        17       195        91
IR     2025250     91400   16.1000 -115.9300       6.8        19       193        98
IR     2025250     91400   16.1000 -116.0600       6.6        19       192        85
IR     2025250     91400   16.1000 -116.2100       8.8        27       188        65
IR     2025250     91400   16.0700 -116.4400      11.5        11       181        99
IR     2025250     91400   16.0100 -116.5300      11.5         8       182       100
IR     2025250     91400   16.0400 -116.8100       9.6         4       199       100
IR     2025250     91400   16.0000 -116.9900       8.5        24       197        88
IR     2025250     91400   16.0700 -117.4300       7.4        39       210        87
IR     2025250     91400   16.0000 -117.6300       9.6        41       201        75
IR     2025250     91400   16.0400 -117.6900       9.3        31       200        92
IR     2025250     91400   16.0600 -117.8000      10.9        12       192        99
IR     2025250     91400   16.0600 -117.9500      12.4         6       193        96
IR     2025250     91400   16.0600 -117.9700      12.4         6       196        91
IR     2025250     91400   15.9700 -118.1100      12.1        22       200        86
IR     2025250     91400   16.0500 -118.2700       6.5        45       211        78
IR     2025250     91400   15.9700 -118.3800       6.1        30       208        81
IR     2025250     91400   15.9700 -118.4900       6.2        39       205        89
IR     2025250     91400   15.9700 -118.5100       6.3        36       204        89
IR     2025250     91400   15.9600 -118.6800      10.8        28       194        98
IR     2025250     91400   15.9600 -118.7700      12.8        24       184        93
IR     2025250     91400   15.9800 -118.8500      14.6        22       182       100
IR     2025250     91400   15.9800 -118.9800      15.1        26       182       100
IR     2025250     91400   15.9600 -119.5000      17.2        36       198        99
IR     2025250     91400   15.9600 -119.5200      17.2        37       198        98
IR     2025250     91400   16.0000 -119.6900      17.8        44       181        93
IR     2025250     91400   16.1500 -110.1700       4.2        29       211        98
IR     2025250     91400   16.0700 -110.3500       5.5        53       214        99
IR     2025250     91400   16.0700 -110.4200       6.1        50       216       100
IR     2025250     91400   16.0600 -110.6100       6.3        43       220        94
IR     2025250     91400   16.0800 -110.6300       6.8        43       220        90
IR     2025250     91400   16.1000 -110.7500       6.8        39       218        82
IR     2025250     91400   16.0500 -110.9200       7.9        53       210        99
IR     2025250     91400   16.1000 -112.0700      14.3        49       196        95
IR     2025250     91400   16.0200 -112.2300      10.8        49       196        98
IR     2025250     91400   16.0600 -112.2700      10.7        47       194        97
IR     2025250     91400   16.0700 -112.4500       7.9        57       190        95
IR     2025250     91400   16.0100 -112.5900       8.4        49       190        99
IR     2025250     91400   16.0400 -112.7000      11.0        47       190       100
IR     2025250     91400   16.0600 -112.7400      10.5        47       190        99
IR     2025250     91400   16.0800 -112.9200       5.3        59       192        94
IR     2025250     91400   16.0400 -113.5000       5.0        59       192        76
IR     2025250     91400   16.0000 -113.6200       7.6        47       195        96
IR     2025250     91400   15.9400 -115.4300       9.9        17       187        93
IR     2025250     91400   15.9700 -115.6000      10.8        25       180        97
IR     2025250     91400   16.0100 -115.6200      10.8        22       180       100
IR     2025250     91400   15.9500 -115.7800      10.5        27       193        99
IR     2025250     91400   15.9300 -115.8700       8.1        28       217        96
IR     2025250     91400   15.9200 -116.2200       8.8        16       196        90
IR     2025250     91400   15.9100 -116.8100      11.1         8       200        99
IR     2025250     91400   15.9400 -117.0000      10.1        25       193        88
IR     2025250     91400   15.9200 -117.0900      10.0        35       195        79
IR     2025250     91400   15.8900 -117.5400       6.4        60       203        82
IR     2025250     91400   15.9100 -117.6500       7.3        38       194        60
IR     2025250     91400   15.9100 -117.7100       7.0        32       192        61
IR     2025250     91400   15.9600 -117.7700       8.4        19       192        85
IR     2025250     91400   15.9200 -117.9000      10.2         9       190        88
IR     2025250     91400   15.9200 -117.9900      12.1         9       192        99
IR     2025250     91400   15.9600 -118.1100      12.5        23       199        90
IR     2025250     91400   15.8900 -118.2000      11.2        37       199        77
IR     2025250     91400   15.8700 -118.3800       5.7        38       203        80
IR     2025250     91400   15.9100 -118.5000       6.6        45       209        88
IR     2025250     91400   15.8700 -118.5900       8.8        27       218       100
IR     2025250     91400   15.8600 -118.6900      13.2        24       215       100
IR     2025250     91400   15.9000 -118.8200      15.0        24       188       100
IR     2025250     91400   15.9400 -118.8300      14.7        23       183       100
IR     2025250     91400   15.8600 -118.9700      17.7        31       183       100
IR     2025250     91400   15.9300 -119.1100      16.7        26       178       100
IR     2025250     91400   15.8500 -119.1800      18.9        28       180       100
IR     2025250     91400   15.9300 -119.4400      17.3        32       204       100
IR     2025250     91400   15.9100 -119.5700      14.7        39       198        91
IR     2025250     91400   16.0300 -110.3600       4.9        47       211       100
IR     2025250     91400   15.9700 -110.4000       5.0        42       209       100
IR     2025250     91400   15.9600 -110.6100       5.9        45       213        99
IR     2025250     91400   16.0000 -110.7000       5.4        43       215        99
IR     2025250     91400   15.9800 -110.8200       4.8        47       209        92
IR     2025250     91400   16.0100 -110.9000       7.0        57       209        99
IR     2025250     91400   15.9600 -112.3300       8.2        48       196        96
IR     2025250     91400   15.9800 -112.3500       7.7        50       196        93
IR     2025250     91400   15.9500 -112.5400       9.5        48       193       100
IR     2025250     91400   15.9100 -112.6400      11.3        44       194        99
IR     2025250     91400   15.9800 -112.7800      13.2        46       192        99
IR     2025250     91400   15.9000 -112.8900      16.4        48       194        78
IR     2025250     91400   15.9200 -112.9500      10.7        63       196        99
IR     2025250     91400   15.9000 -113.1400       5.3       107       201        91
IR     2025250     91400   15.9100 -113.3400       5.0        60       199        97
IR     2025250     91400   15.9500 -113.3800       5.8        51       197        99
IR     2025250     91400   15.8600 -115.5500      12.5        30       180        91
IR     2025250     91400   15.8500 -115.6600      13.1        30       185        87
IR     2025250     91400   15.8300 -115.7800       9.1        34       201        94
IR     2025250     91400   15.8500 -115.8600       6.9        36       220        91
IR     2025250     91400   15.9100 -115.8900       6.7        28       227        96
IR     2025250     91400   15.8100 -116.8400      11.4        14       198       100
IR     2025250     91400   15.8600 -116.9200      12.3        17       193        99
IR     2025250     91400   15.8000 -117.0400      11.9        29       191        98
IR     2025250     91400   15.8000 -117.8700       6.4        17       188        95
IR     2025250     91400   15.8200 -118.0200       9.6        25       191       100
IR     2025250     91400   15.8600 -118.1200      12.6        34       195        89
IR     2025250     91400   15.7800 -118.2400      11.1        38       194        98
IR     2025250     91400   15.7900 -118.3400       7.8        30       198        96
IR     2025250     91400   15.8100 -118.4100       6.9        34       199        98
IR     2025250     91400   15.8500 -118.6800      13.2        23       217       100
IR     2025250     91400   15.8400 -118.8000      16.2        22       202       100
IR     2025250     91400   15.7600 -118.9200      19.1        33       183       100
IR     2025250     91400   15.7600 -119.0500      19.7        34       180       100
IR     2025250     91400   15.7600 -119.1500      19.5        32       182       100
IR     2025250     91400   15.8100 -119.4000      17.9        38       200       100
IR     2025250     91400   15.7500 -119.5100      16.7        49       193        98
IR     2025250     91400   15.7500 -119.6100      14.1        52       185        99
IR     2025250     91400   15.9300 -109.5500       4.8       318       272        97
IR     2025250     91400   15.8700 -110.4200       4.9        35       208        98
IR     2025250     91400   15.8700 -110.4600       5.5        41       208        95
IR     2025250     91400   15.8600 -110.6300       5.5        44       208        91
IR     2025250     91400   15.9200 -110.7400       5.1        41       208        93
IR     2025250     91400   15.9400 -110.7800       4.8        39       208        83
IR     2025250     91400   15.9200 -110.9000       5.3        54       207        81
IR     2025250     91400   15.8100 -112.5600      13.0        44       197       100
IR     2025250     91400   15.8900 -112.6200      11.7        44       195       100
IR     2025250     91400   15.8500 -112.7600      16.6        40       194        71
IR     2025250     91400   15.8000 -112.8600      17.8        41       196        90
IR     2025250     91400   15.8800 -112.9400      11.7        57       197        98
IR     2025250     91400   15.8000 -113.1100       9.4        72       202        93
IR     2025250     91400   15.7900 -113.2700       5.6        67       200        97
IR     2025250     91400   15.8100 -113.2900       4.8        69       200        99
IR     2025250     91400   15.7900 -113.4500       6.2        40       199        99
IR     2025250     91400   15.7900 -113.6100       4.3        44       197        97
IR     2025250     91400   15.8600 -113.6600       5.2        40       196       100
IR     2025250     91400   15.8200 -113.7400       5.0        42       193        99
IR     2025250     91400   15.8200 -113.8500       4.2        51       194        99
IR     2025250     91400   15.8000 -115.3600      13.6        20       180        95
IR     2025250     91400   15.8000 -115.5200      13.8        29       181        90
IR     2025250     91400   15.8100 -115.6700      13.3        31       189        88
IR     2025250     91400   15.7900 -115.7400      10.7        31       195        93
IR     2025250     91400   15.8100 -115.8700       6.9        36       219        98
IR     2025250     91400   15.7900 -115.9100       5.6        35       234        97
IR     2025250     91400   15.7900 -116.8500      11.0        14       197       100
IR     2025250     91400   15.7300 -116.9400       8.9        22       198        95
IR     2025250     91400   15.7800 -117.0200      11.2        29       189       100
IR     2025250     91400   15.6900 -117.7400       7.4        11       183        93
IR     2025250     91400   15.7100 -117.7600       7.6        11       183        94
IR     2025250     91400   15.7600 -117.9200       7.2        21       188       100
IR     2025250     91400   15.7600 -117.9700       7.9        26       189       100
IR     2025250     91400   15.7200 -118.1600      10.3        39       190        92
IR     2025250     91400   15.7400 -118.2700      10.1        40       192        94
IR     2025250     91400   15.6700 -118.7200      15.5        22       199        94
IR     2025250     91400   15.7300 -118.7800      16.5        23       204        97
IR     2025250     91400   15.7400 -118.9400      19.9        35       181       100
IR     2025250     91400   15.7000 -119.0500      20.7        34       180       100
IR     2025250     91400   15.7200 -119.1400      19.8        33       182       100
IR     2025250     91400   15.7000 -119.2900      20.1        39       197        99
IR     2025250     91400   15.7400 -119.3000      20.1        39       199        98
IR     2025250     91400   15.7100 -119.4700      17.4        49       191        96
IR     2025250     91400   15.7300 -119.5100      16.9        51       192        97
IR     2025250     91400   15.7100 -119.6200      14.7        54       178        99
IR     2025250     91400   15.8200 -109.4000       4.0       326       286        99
IR     2025250     91400   15.8400 -109.5200       5.5       309       276       100
IR     2025250     91400   15.7900 -110.2900       5.1        38       208       100
IR     2025250     91400   15.8500 -110.4000       4.8        35       208        99
IR     2025250     91400   15.8500 -110.4700       6.0        43       208        97
IR     2025250     91400   15.8400 -110.6100       5.7        46       208        92
IR     2025250     91400   15.8300 -110.9900       4.3        52       206        66
IR     2025250     91400   15.7700 -111.7400       8.3        62       206        94
IR     2025250     91400   15.7900 -111.7800       7.7        59       207        90
IR     2025250     91400   15.8100 -111.9700       5.8        39       208        95
IR     2025250     91400   15.7300 -112.1000      10.4        39       208        96
IR     2025250     91400   15.7100 -112.6300      16.4        38       199        75
IR     2025250     91400   15.7700 -112.6600      19.3        35       198       100
IR     2025250     91400   15.7100 -112.8100      17.1        35       202        80
IR     2025250     91400   15.7500 -112.8900      17.6        39       200        89
IR     2025250     91400   15.7600 -113.0700      11.0        62       203       100
IR     2025250     91400   15.7200 -113.2100       7.7        74       199        97
IR     2025250     91400   15.7400 -113.2300       6.8        74       200        95
IR     2025250     91400   15.7500 -113.4600       4.6        45       199        96
IR     2025250     91400   15.7600 -113.7700       4.4        49       192        94
IR     2025250     91400   15.6900 -115.3400      16.4        23       176        92
IR     2025250     91400   15.7200 -115.4400      15.4        28       177        94
IR     2025250     91400   15.7200 -115.6000      16.2        36       185       100
IR     2025250     91400   15.7000 -115.7300      11.8        31       193       100
IR     2025250     91400   15.6500 -115.8500      10.0        22       199        99
IR     2025250     91400   15.6300 -115.9200       9.6        19       199        93
IR     2025250     91400   15.6300 -116.8300       8.0        22       195        99
IR     2025250     91400   15.6900 -116.9300       7.7        24       200        95
IR     2025250     91400   15.6900 -116.9500       7.4        26       200        92
IR     2025250     91400   15.6600 -117.1700       6.3        41       205        80
IR     2025250     91400   15.6300 -117.7100       7.3        20       183        96
IR     2025250     91400   15.5900 -117.9000       9.0        20       180        92
IR     2025250     91400   15.6500 -117.9800       9.5        24       186        91
IR     2025250     91400   15.6200 -118.1100      12.2        31       188        97
IR     2025250     91400   15.6000 -118.1800      12.2        38       188        99
IR     2025250     91400   15.6400 -118.2600      12.1        41       187        94
IR     2025250     91400   15.6400 -118.4100      11.0        34       187        97
IR     2025250     91400   15.6600 -118.4500      10.5        34       188        90
IR     2025250     91400   15.5700 -118.6500      14.3        24       181        94
IR     2025250     91400   15.5700 -118.6700      14.6        26       181        94
IR     2025250     91400   15.5900 -118.8400      18.1        34       182        99
IR     2025250     91400   15.5700 -118.9700      19.9        36       177       100
IR     2025250     91400   15.6400 -119.0400      20.8        34       179       100
IR     2025250     91400   15.5800 -119.1100      20.3        32       177       100
IR     2025250     91400   15.6200 -119.2100      20.3        35       182        99
IR     2025250     91400   15.6200 -119.3400      20.4        44       186        96
IR     2025250     91400   15.6200 -119.4600      20.5        49       172        91
IR     2025250     91400   15.6300 -119.5900      16.6        58       150        99
IR     2025250     91400   15.6300 -119.6100      16.3        59       144        99
IR     2025250     91400   15.7000 -109.3300       5.4        15       272        96
IR     2025250     91400   15.7600 -109.4900       5.7       313       280        97
IR     2025250     91400   15.7600 -110.2300       5.0        40       210       100
IR     2025250     91400   15.7300 -110.3200       6.6        41       209       100
IR     2025250     91400   15.7300 -110.4200       8.2        44       209        99
IR     2025250     91400   15.7300 -110.5100       8.2        48       208       100
IR     2025250     91400   15.6400 -112.4100      17.6        44       203        88
IR     2025250     91400   15.6600 -112.4300      17.4        44       201        87
IR     2025250     91400   15.6800 -112.5400      17.0        43       200        81
IR     2025250     91400   15.6700 -112.7500      19.8        34       201       100
IR     2025250     91400   15.6900 -112.7900      17.4        35       203        82
IR     2025250     91400   15.6800 -113.2000       7.6        77       199        99
IR     2025250     91400   15.6800 -113.2200       7.0        81       198        99
IR     2025250     91400   15.5800 -114.2300       4.2       333       216        97
IR     2025250     91400   15.6300 -115.2100      15.7        20       183        88
IR     2025250     91400   15.6300 -115.4100      15.8        30       175        94
IR     2025250     91400   15.5400 -115.5100      15.9        42       177       100
IR     2025250     91400   15.6200 -115.5900      15.2        39       182       100
IR     2025250     91400   15.5800 -115.7500      12.9        17       188       100
IR     2025250     91400   15.6100 -115.9000      10.6        17       196        94
IR     2025250     91400   15.5200 -116.6500       9.7        24       190        99
IR     2025250     91400   15.5200 -116.7800       9.1        24       185       100
IR     2025250     91400   15.5500 -116.8400       7.7        25       192        97
IR     2025250     91400   15.5800 -117.5200       4.6        61       194        76
IR     2025250     91400   15.5200 -117.6800      11.9        31       182        98
IR     2025250     91400   15.5700 -117.7400       9.5        22       180        98
IR     2025250     91400   15.4900 -117.9000      11.0        29       183        97
IR     2025250     91400   15.4900 -117.9400      10.1        29       184        97
IR     2025250     91400   15.5100 -118.0900       9.9        25       189        99
IR     2025250     91400   15.5100 -118.1700      10.3        29       190        80
IR     2025250     91400   15.5200 -118.2800      12.6        39       189        93
IR     2025250     91400   15.5600 -118.3500      13.1        38       186        98
IR     2025250     91400   15.5600 -118.4800      14.0        31       183        95
IR     2025250     91400   15.5500 -118.6300      14.2        25       180        94
IR     2025250     91400   15.4800 -118.7000      16.6        31       180        98
IR     2025250     91400   15.4900 -118.8100      17.1        38       180       100
IR     2025250     91400   15.4700 -118.9200      18.2        38       172       100
IR     2025250     91400   15.4900 -119.0600      19.6        34       168        99
IR     2025250     91400   15.5100 -119.1400      19.9        31       170       100
IR     2025250     91400   15.5400 -119.3700      20.6        40       175        95
IR     2025250     91400   15.5400 -119.4700      17.9        44       154        94
IR     2025250     91400   15.6800 -109.5800       6.1       341       269        97
IR     2025250     91400   15.5900 -109.6900       5.1         8       255        96
IR     2025250     91400   15.5900 -109.9300       4.2        58       221        95
IR     2025250     91400   15.5800 -110.0500       6.1        55       218        92
IR     2025250     91400   15.6000 -110.2600       7.2        49       214        84
IR     2025250     91400   15.5800 -110.2800       8.1        49       214        87
IR     2025250     91400   15.5700 -110.4700       8.2        45       208        87
IR     2025250     91400   15.5900 -110.6100       6.1        46       206        98
IR     2025250     91400   15.6300 -110.6800       5.0        50       206        98
IR     2025250     91400   15.5600 -111.6000      10.5        50       208       100
IR     2025250     91400   15.6100 -112.1200      15.3        39       210       100
IR     2025250     91400   15.5200 -112.4500      17.7        41       204        89
IR     2025250     91400   15.5600 -112.5400      18.2        41       201        94
IR     2025250     91400   15.5400 -112.6600      17.4        38       204        83
IR     2025250     91400   15.5700 -112.7000      20.1        35       203       100
IR     2025250     91400   15.5100 -113.0700       7.9        60       205        86
IR     2025250     91400   15.5800 -113.1700       6.7        79       200        99
IR     2025250     91400   15.5000 -113.3000       5.5        92       201        95
IR     2025250     91400   15.4800 -114.1800       4.6       333       211        99
IR     2025250     91400   15.4900 -115.1500       7.8         5       186        65
IR     2025250     91400   15.4900 -115.3500      13.5        27       172        96
IR     2025250     91400   15.5100 -115.3700      14.1        31       172        97
IR     2025250     91400   15.5100 -115.5000      16.1        42       176        99
IR     2025250     91400   15.5200 -115.6700      14.6        30       181        99
IR     2025250     91400   15.5000 -116.7600       9.5        24       184       100
IR     2025250     91400   15.4900 -116.9100       8.1        30       193        87
IR     2025250     91400   15.4000 -117.5900      15.3        42       180        99
IR     2025250     91400   15.4600 -117.6700      14.2        35       182        98
IR     2025250     91400   15.4000 -117.8500      13.5        36       184        98
IR     2025250     91400   15.4300 -117.8800      12.2        34       185        98
IR     2025250     91400   15.4500 -118.2200      12.9        35       196        72
IR     2025250     91400   15.4600 -118.2800      13.6        36       194        94
IR     2025250     91400   15.4600 -118.4500      16.5        28       186        98
IR     2025250     91400   15.4200 -118.5900      17.3        25       184        96
IR     2025250     91400   15.4400 -118.6700      17.4        29       181        99
IR     2025250     91400   15.3800 -118.7400      18.9        31       181       100
IR     2025250     91400   15.4500 -118.8100      17.7        38       180       100
IR     2025250     91400   15.4500 -118.9400      18.4        37       169       100
IR     2025250     91400   15.3900 -119.0700      19.3        34       166        99
IR     2025250     91400   15.3700 -119.1400      19.7        31       166        99
IR     2025250     91400   15.4100 -119.3000      20.8        29       167        99
IR     2025250     91400   15.4400 -119.3400      20.7        31       170        99
IR     2025250     91400   15.4400 -119.4900      14.5        39       152        93
IR     2025250     91400   15.5000 -109.4400       9.7        30       254        97
IR     2025250     91400   15.5200 -109.4900       9.9        24       259        98
IR     2025250     91400   15.5700 -109.6900       5.9        17       255        95
IR     2025250     91400   15.5300 -109.8900       4.6        55       222       100
IR     2025250     91400   15.5500 -110.0100       5.6        56       220        94
IR     2025250     91400   15.5400 -110.0800       7.2        55       219        93
IR     2025250     91400   15.4800 -110.3000       8.7        49       215        77
IR     2025250     91400   15.4800 -110.3300       8.6        49       214        79
IR     2025250     91400   15.4700 -110.4700       5.7        41       207        75
IR     2025250     91400   15.4900 -110.6500       4.2        47       202        93
IR     2025250     91400   15.5100 -110.6700       4.5        49       203        93
IR     2025250     91400   15.4600 -110.8900       5.2        52       204        76
IR     2025250     91400   15.4500 -111.3400      10.8        34       210        99
IR     2025250     91400   15.4700 -111.3600      11.1        33       210       100
IR     2025250     91400   15.5100 -111.5600      10.1        44       208        97
IR     2025250     91400   15.4600 -111.6400       9.7        36       208        97
IR     2025250     91400   15.5000 -111.7200      10.7        37       209        97
IR     2025250     91400   15.5000 -111.8200      13.0        34       213        95
IR     2025250     91400   15.4600 -112.4200      13.9        42       206       100
IR     2025250     91400   15.5000 -112.4600      15.2        42       204        99
IR     2025250     91400   15.5000 -112.6600      17.7        38       206        88
IR     2025250     91400   15.5000 -112.6900      20.1        37       205        99
IR     2025250     91400   15.4000 -113.2500       5.2        78       203        99
IR     2025250     91400   15.4400 -113.2600       5.6        86       203        99
IR     2025250     91400   15.4600 -113.3700       5.7        83       203       100
IR     2025250     91400   15.4300 -113.7400       4.3        40       187       100
IR     2025250     91400   15.4400 -115.1100       6.6       352       189        92
IR     2025250     91400   15.3500 -115.3000      11.4         8       176        98
IR     2025250     91400   15.3500 -115.3900      13.5        24       174        99
IR     2025250     91400   15.3900 -115.5200      16.9        38       174       100
IR     2025250     91400   15.3700 -115.6300      17.3        37       177       100
IR     2025250     91400   15.3500 -115.7200      16.6        31       180        99
IR     2025250     91400   15.3400 -116.1600      14.9        35       187        99
IR     2025250     91400   15.3400 -116.7600      14.3        27       184        99
IR     2025250     91400   15.3200 -117.0700       8.3        46       192        93
IR     2025250     91400   15.3800 -117.5700      15.5        43       179        98
IR     2025250     91400   15.3600 -117.8300      14.0        38       185        98
IR     2025250     91400   15.3800 -117.9300      11.7        38       192        93
IR     2025250     91400   15.3300 -118.3000      14.0        25       194        82
IR     2025250     91400   15.3300 -118.4100      18.1        25       189        98
IR     2025250     91400   15.2900 -118.5400      21.2        22       187        96
IR     2025250     91400   15.3600 -118.6100      19.8        25       183        96
IR     2025250     91400   15.3600 -118.7400      19.4        30       181       100
IR     2025250     91400   15.3600 -118.7600      19.3        31       180       100
IR     2025250     91400   15.3500 -118.9300      19.3        38       167       100
IR     2025250     91400   15.3500 -119.0200      19.4        36       165       100
IR     2025250     91400   15.3500 -119.0800      19.5        35       165        99
IR     2025250     91400   15.3100 -119.2500      19.8        29       167        98
IR     2025250     91400   15.3500 -119.2900      20.4        29       166        98
IR     2025250     91400   15.3500 -119.3900      17.5        31       163        98
IR     2025250     91400   15.2900 -119.5100      15.8        40       159        98
IR     2025250     91400   15.4600 -109.4800       8.4        30       252        96
IR     2025250     91400   15.4100 -110.0100       6.3        60       217        81
IR     2025250     91400   15.4200 -110.1500       8.3        58       219        95
IR     2025250     91400   15.4600 -110.2800       8.5        49       216        74
IR     2025250     91400   15.4600 -110.3100       8.4        49       215        75
IR     2025250     91400   15.3800 -110.4400       6.0        50       204        82
IR     2025250     91400   15.3900 -110.7700       4.1        61       202        80
IR     2025250     91400   15.3900 -110.7900       4.5        59       202        79
IR     2025250     91400   15.3600 -111.2400       9.4        37       211        94
IR     2025250     91400   15.3600 -111.2900       8.7        38       210        99
IR     2025250     91400   15.4100 -111.4600      10.8        44       208        99
IR     2025250     91400   15.3700 -111.5900       7.5        49       206       100
IR     2025250     91400   15.4300 -111.6000       9.3        43       207        94
IR     2025250     91400   15.3600 -111.7700       7.4        39       207        99
IR     2025250     91400   15.3600 -111.8900      14.8        39       211        96
IR     2025250     91400   15.3600 -112.5500      19.8        37       208        99
IR     2025250     91400   15.4000 -112.6300      20.0        37       208       100
IR     2025250     91400   15.3900 -113.0500       4.4       122       203        61
IR     2025250     91400   15.3800 -113.2500       5.3        70       203        99
IR     2025250     91400   15.3600 -113.3700       8.7        44       203        99
IR     2025250     91400   15.3000 -113.4900      13.0        28       186        97
IR     2025250     91400   15.3000 -113.5100      12.4        26       185        96
IR     2025250     91400   15.3300 -113.8200       5.5        37       186        97
IR     2025250     91400   15.3300 -113.9300       4.0        30       189        89
IR     2025250     91400   15.3300 -114.8900       6.8       353       208        63
IR     2025250     91400   15.3400 -114.9100       6.8       354       208        79
IR     2025250     91400   15.3400 -115.0400       7.7         4       197        80
IR     2025250     91400   15.2600 -115.1600       9.6        10       188        99
IR     2025250     91400   15.3000 -115.2700      10.8         7       182        99
IR     2025250     91400   15.2500 -115.4300      13.6        20       178        91
IR     2025250     91400   15.3300 -115.5500      17.2        36       174       100
IR     2025250     91400   15.2500 -115.6700      18.2        35       180       100
IR     2025250     91400   15.2400 -116.0400      10.8        41       225        99
IR     2025250     91400   15.3200 -116.1400      14.4        36       192       100
IR     2025250     91400   15.2800 -116.9200      14.6        31       184       100
IR     2025250     91400   15.2300 -117.4200      17.0        47       176        97
IR     2025250     91400   15.2300 -117.4400      17.1        47       176        98
IR     2025250     91400   15.2700 -117.5400      18.2        45       176       100
IR     2025250     91400   15.2000 -117.8900       9.9        38       204        97
IR     2025250     91400   15.2600 -118.0100       8.0        50       203        86
IR     2025250     91400   15.2600 -118.1000       6.7        53       201        92
IR     2025250     91400   15.1900 -118.2100      11.0        40       192        87
IR     2025250     91400   15.2500 -118.3100      14.5        27       187        90
IR     2025250     91400   15.2300 -118.4400      19.1        23       184        99
IR     2025250     91400   15.2300 -118.5500      21.1        22       183        97
IR     2025250     91400   15.2600 -118.5800      21.7        23       185        96
IR     2025250     91400   15.2000 -118.7600      20.7        32       177        99
IR     2025250     91400   15.2600 -118.8600      19.9        37       171       100
IR     2025250     91400   15.2000 -118.9900      20.1        32       168        99
IR     2025250     91400   15.2200 -119.1000      19.7        32       167        95
IR     2025250     91400   15.2200 -119.1200      19.8        31       167        94
IR     2025250     91400   15.2300 -119.2200      19.9        30       168        95
IR     2025250     91400   15.2500 -119.4100      19.2        34       168        97
IR     2025250     91400   15.1700 -119.5200      18.9        38       178        99
IR     2025250     91400   15.1900 -119.6000      18.2        42       179        81
IR     2025250     91400   15.1900 -119.6400      18.0        42       179        73
IR     2025250     91400   15.3000 -109.6000       4.3       323       247        98
IR     2025250     91400   15.3000 -109.8200       4.4       356       219        83
IR     2025250     91400   15.3300 -109.9500       5.8        50       217        90
IR     2025250     91400   15.3500 -110.0700       7.0        58       218        85
IR     2025250     91400   15.3100 -110.1000       7.1        59       218        87
IR     2025250     91400   15.2800 -110.3200       6.5        54       219        87
IR     2025250     91400   15.3000 -110.3900       6.3        55       210        93
IR     2025250     91400   15.3600 -110.5200       4.6        55       201        78
IR     2025250     91400   15.2700 -110.6700       4.9        88       201        93
IR     2025250     91400   15.2900 -110.6900       4.6        86       201        87
IR     2025250     91400   15.3200 -111.2900       8.0        43       211       100
IR     2025250     91400   15.2900 -111.3700       8.6        60       209       100
IR     2025250     91400   15.2500 -111.5600       4.6        76       208        98
IR     2025250     91400   15.3300 -111.6900       5.4        45       207        95
IR     2025250     91400   15.2100 -113.3000       8.2        31       184       100
IR     2025250     91400   15.2200 -113.4300      11.3        25       183       100
IR     2025250     91400   15.2800 -113.4900      13.1        26       184        98
IR     2025250     91400   15.2000 -113.5700      10.7        17       182        88
IR     2025250     91400   15.2200 -113.7300       8.5        31       182        91
IR     2025250     91400   15.2100 -113.8400       5.5        26       184        62
IR     2025250     91400   15.1900 -114.0000       4.6         3       187        75
IR     2025250     91400   15.2100 -114.0200       4.2       357       190        77
IR     2025250     91400   15.2300 -114.7300       6.3       353       218        79
IR     2025250     91400   15.2500 -114.8100       5.1       352       213        60
IR     2025250     91400   15.2500 -114.9700       5.9       357       201        85
IR     2025250     91400   15.2000 -115.1500      10.0        19       192        96
IR     2025250     91400   15.2000 -115.2400      10.6        16       189       100
IR     2025250     91400   15.1600 -115.4000      11.6        18       185        84
IR     2025250     91400   15.2400 -115.4300      13.5        20       179        83
IR     2025250     91400   15.1900 -115.5900      15.9        35       178        88
IR     2025250     91400   15.1900 -115.6800      18.0        35       181       100
IR     2025250     91400   15.2200 -116.0200      11.3        41       227        99
IR     2025250     91400   15.1400 -116.1600       7.9        56       275        93
IR     2025250     91400   15.1400 -116.1800       8.3        56       276        91
IR     2025250     91400   15.2100 -116.4800      12.3        36       243        80
IR     2025250     91400   15.2000 -116.9700      11.8        38       194        96
IR     2025250     91400   15.1800 -117.2600      12.8        50       190        96
IR     2025250     91400   15.1300 -117.6100      12.5        50       192        94
IR     2025250     91400   15.1400 -117.8200       7.6        46       204        96
IR     2025250     91400   15.1400 -117.9200       7.8        42       205        93
IR     2025250     91400   15.1400 -118.0500       6.5        51       199        97
IR     2025250     91400   15.1400 -118.1400       9.0        44       194        98
IR     2025250     91400   15.1600 -118.2400      12.5        35       189        92
IR     2025250     91400   15.1700 -118.4300      17.7        23       182        91
IR     2025250     91400   15.0900 -118.5400      18.6        24       179       100
IR     2025250     91400   15.1100 -118.5600      19.3        25       178        99
IR     2025250     91400   15.1100 -118.6900      20.5        30       172        99
IR     2025250     91400   15.1600 -118.8300      20.3        33       170       100
IR     2025250     91400   15.0800 -118.9200      19.4        30       168       100
IR     2025250     91400   15.1000 -118.9800      19.4        30       168       100
IR     2025250     91400   15.1600 -119.0800      19.3        30       167        97
IR     2025250     91400   15.1600 -119.2300      19.0        32       168        97
IR     2025250     91400   15.0700 -119.3900      19.5        38       175       100
IR     2025250     91400   15.0900 -119.4900      18.6        38       182       100
IR     2025250     91400   15.0900 -119.5100      18.4        38       184       100
IR     2025250     91400   15.0900 -119.6100      17.5        38       189       100
IR     2025250     91400   15.0700 -119.8000      15.6        42       188        89
IR     2025250     91400   15.2900 -109.4200       5.1        36       235        98
IR     2025250     91400   15.2400 -109.6200       4.5       323       245        97
IR     2025250     91400   15.2200 -109.7200       5.7       328       223        87
IR     2025250     91400   15.2400 -109.8300       4.3       352       219        77
IR     2025250     91400   15.2000 -109.9100       4.4        34       217        73
IR     2025250     91400   15.2300 -110.1200       6.2        64       217        90
IR     2025250     91400   15.2700 -110.1800       6.6        62       220        96
IR     2025250     91400   15.2600 -110.3000       6.2        55       219        86
IR     2025250     91400   15.2500 -110.6500       5.2        86       202        96
IR     2025250     91400   15.2100 -110.8000       5.9        75       209        85
IR     2025250     91400   15.2300 -110.9100       8.3        57       209        94
IR     2025250     91400   15.2500 -110.9300       9.0        54       209        85
IR     2025250     91400   15.2400 -111.1700       9.5        50       213        87
IR     2025250     91400   15.1600 -111.3900       7.8        77       218        97
IR     2025250     91400   15.1700 -111.4600       6.6        77       217        99
IR     2025250     91400   15.1300 -113.1800       5.0        31       184        65
IR     2025250     91400   15.1300 -113.2900       6.8        31       184        80
IR     2025250     91400   15.1100 -113.3600       8.7        26       183        95
IR     2025250     91400   15.1100 -113.4800      13.0        23       182        96
IR     2025250     91400   15.1400 -113.5800      11.5        19       180        93
IR     2025250     91400   15.1400 -113.6700       9.5        22       180        97
IR     2025250     91400   15.1300 -113.8700       5.5        16       183        69
IR     2025250     91400   15.1700 -113.9800       4.7         7       186        73
IR     2025250     91400   15.0900 -114.0600       4.3       355       198        99
IR     2025250     91400   15.0900 -115.0600       9.6        16       196        89
IR     2025250     91400   15.1100 -115.0800       9.7        19       195        96
IR     2025250     91400   15.0800 -115.2600      11.5        18       191        96
IR     2025250     91400   15.0600 -115.3900       8.9        24       189        79
IR     2025250     91400   15.0800 -115.4100       9.1        23       188        75
IR     2025250     91400   15.1300 -115.5800      15.5        34       180        85
IR     2025250     91400   15.1300 -115.6400      17.3        37       180        97
IR     2025250     91400   15.0500 -115.9600      12.2        34       234        99
IR     2025250     91400   15.0200 -117.2400      12.6        47       189        85
IR     2025250     91400   15.0400 -117.2500      13.2        47       189        84
IR     2025250     91400   15.0700 -117.4400      15.3        48       186        92
IR     2025250     91400   15.0700 -117.4600      15.7        47       187        85
IR     2025250     91400   15.0700 -117.6300      10.0        51       196        94
IR     2025250     91400   15.0700 -117.7000       8.3        54       198        98
IR     2025250     91400   15.0500 -117.8100       6.7        44       202        96
IR     2025250     91400   15.0300 -117.9800       7.8        43       199        91
IR     2025250     91400   15.0800 -118.0400       6.7        51       199        92
IR     2025250     91400   15.0800 -118.2900      15.5        33       187       100
IR     2025250     91400   15.0100 -118.4900      16.5        25       183       100
IR     2025250     91400   14.9900 -118.5400      16.4        24       181       100
IR     2025250     91400   15.0700 -118.6100      18.7        28       175       100
IR     2025250     91400   15.0700 -118.7400      19.8        33       170       100
IR     2025250     91400   15.0600 -118.9100      19.2        30       168       100
IR     2025250     91400   15.0600 -118.9300      19.2        30       168       100
IR     2025250     91400   15.0600 -119.0300      18.7        30       169        99
IR     2025250     91400   15.0000 -119.1400      17.9        33       172        99
IR     2025250     91400   14.9800 -119.3300      19.9        45       176        99
IR     2025250     91400   15.0200 -119.3700      19.9        42       177       100
IR     2025250     91400   15.0500 -119.4500      19.5        39       183       100
IR     2025250     91400   14.9700 -119.6500      17.4        41       195        96
IR     2025250     91400   14.9700 -119.6900      17.1        41       195        96
IR     2025250     91400   15.1400 -109.6600       8.0       351       241        92
IR     2025250     91400   15.1200 -109.7800       6.5       354       220        83
IR     2025250     91400   15.1400 -109.9400       4.7        56       217        82
IR     2025250     91400   15.1500 -110.0600       4.3        75       216        76
IR     2025250     91400   15.1500 -110.1800       5.8        70       218        94
IR     2025250     91400   15.0900 -110.3100       4.7        63       219       100
IR     2025250     91400   15.1600 -110.4100       4.3        66       216       100
IR     2025250     91400   15.0800 -110.5900       4.8        76       215        96
IR     2025250     91400   15.1200 -110.6100       5.4        79       211        96
IR     2025250     91400   15.0700 -110.8000       5.1        76       217        99
IR     2025250     91400   15.0900 -110.9200       5.0        75       216        93
IR     2025250     91400   15.0700 -110.9900       4.0        76       218        96
IR     2025250     91400   15.0800 -111.1500       6.9        73       219        92
IR     2025250     91400   15.0600 -111.2200       8.0        68       221        84
IR     2025250     91400   15.1000 -111.4000       6.9        72       220        94
IR     2025250     91400   15.1400 -111.4400       6.7        76       219        92
IR     2025250     91400   15.0900 -111.8200       5.3       261       217        78
IR     2025250     91400   15.0500 -113.3300       5.7        33       183        84
IR     2025250     91400   15.0700 -113.3500       7.4        28       183        91
IR     2025250     91400   15.0900 -113.4600      12.4        22       182        97
IR     2025250     91400   15.0200 -113.6200      13.6        24       175        97
IR     2025250     91400   15.0200 -113.7400      11.3        24       174        98
IR     2025250     91400   15.0400 -113.8000       8.8        19       177        95
IR     2025250     91400   15.0000 -114.0100       5.2       356       185        81
IR     2025250     91400   15.0500 -114.0400       4.4       354       194        94
IR     2025250     91400   15.0600 -114.5100       5.4       230       227        90
IR     2025250     91400   14.9900 -115.0300       7.4        16       196        97
IR     2025250     91400   15.0000 -115.3100      12.9        24       191       100
IR     2025250     91400   14.9800 -115.3600      12.6        25       191        99
IR     2025250     91400   14.9600 -115.4500      12.6        22       189       100
IR     2025250     91400   15.0300 -115.9400      12.8        34       232        96
IR     2025250     91400   14.9900 -116.0800      10.3        38       243        97
IR     2025250     91400   14.9500 -116.1500      12.9        36       241        95
IR     2025250     91400   14.9200 -117.4200      15.7        43       185        63
IR     2025250     91400   14.9200 -117.4800      11.2        54       186        99
IR     2025250     91400   14.9900 -117.5800      11.5        49       193       100
IR     2025250     91400   14.9900 -117.7100       8.4        56       198       100
IR     2025250     91400   14.9100 -117.8500       8.5        37       193        99
IR     2025250     91400   14.9900 -117.8600       6.9        46       199       100
IR     2025250     91400   14.9900 -118.0100       8.6        39       195        73
IR     2025250     91400   14.9200 -118.1600      13.6        32       191        93
IR     2025250     91400   14.9200 -118.2300      15.1        32       190        90
IR     2025250     91400   14.9600 -118.3100      16.3        33       189        98
IR     2025250     91400   14.9000 -118.4800      16.0        24       183        95
IR     2025250     91400   14.9600 -118.5200      16.0        23       183       100
IR     2025250     91400   14.9100 -118.8200      19.1        35       170       100
IR     2025250     91400   14.9300 -118.9900      17.7        29       174       100
IR     2025250     91400   14.9300 -119.0100      17.6        30       176       100
IR     2025250     91400   14.9400 -119.1500      17.1        36       175        98
IR     2025250     91400   14.9400 -119.2600      18.8        45       176        98
IR     2025250     91400   14.9600 -119.3400      19.7        46       177        99
IR     2025250     91400   14.8800 -119.5100      20.8        47       193        96
IR     2025250     91400   14.8800 -119.6200      18.0        43       195        98
IR     2025250     91400   14.9300 -119.7000      17.6        40       196        96
IR     2025250     91400   15.0500 -109.6500       7.9         7       220        96
IR     2025250     91400   15.0600 -109.6700       8.3         5       221        96
IR     2025250     91400   15.0000 -109.8500       6.2        54       217        97
IR     2025250     91400   15.0000 -110.0200       4.2       111       218        74
IR     2025250     91400   15.0700 -110.2400       4.7        71       219        99
IR     2025250     91400   15.0700 -110.2600       4.6        68       220       100
IR     2025250     91400   15.0600 -110.5700       4.3        73       216        94
IR     2025250     91400   15.0400 -110.7900       4.4        73       219        99
IR     2025250     91400   14.9700 -110.9400       4.7        54       223        94
IR     2025250     91400   15.0100 -111.0900       5.3        65       224        98
IR     2025250     91400   14.9800 -111.2800       8.5        61       227        99
IR     2025250     91400   15.0000 -111.4000       7.4        58       225        91
IR     2025250     91400   14.9500 -111.9100       5.5       252       217        98
IR     2025250     91400   14.9700 -113.3400       6.6        31       182        82
IR     2025250     91400   14.9900 -113.3600       7.9        27       181        93
IR     2025250     91400   14.9500 -113.5700      15.9        22       170        99
IR     2025250     91400   14.9700 -113.5900      15.4        23       171        98
IR     2025250     91400   14.9100 -113.7100      15.1        23       168        97
IR     2025250     91400   14.9000 -113.9100       8.2        14       177        89
IR     2025250     91400   14.9200 -113.9800       7.2         7       185        99
IR     2025250     91400   14.9800 -114.0300       4.4       354       198        92
IR     2025250     91400   14.9000 -114.9300      10.8        20       196       100
IR     2025250     91400   14.9500 -115.0100       8.6        18       196        95
IR     2025250     91400   14.8900 -116.1600      13.0        36       235        98
IR     2025250     91400   14.9100 -117.1700      11.3        43       188        86
IR     2025250     91400   14.8400 -117.3700      10.1        45       187        91
IR     2025250     91400   14.8600 -117.4700       9.4        54       187        99
IR     2025250     91400   14.8800 -117.4900       9.5        57       187        99
IR     2025250     91400   14.8200 -117.6900       9.5        40       192        77
IR     2025250     91400   14.8400 -117.7900       9.2        33       192        95
IR     2025250     91400   14.8700 -117.8300       8.8        34       192       100
IR     2025250     91400   14.8300 -117.9200      11.3        34       190       100
IR     2025250     91400   14.8500 -118.0500      13.5        34       190        88
IR     2025250     91400   14.8500 -118.1500      14.5        31       189        97
IR     2025250     91400   14.8800 -118.2300      15.3        30       189        86
IR     2025250     91400   14.8000 -118.3700      14.4        32       183        77
IR     2025250     91400   14.8800 -118.5300      15.6        24       182        94
IR     2025250     91400   14.8200 -118.6400      15.2        27       178        98
IR     2025250     91400   14.8000 -118.6700      15.7        29       177       100
IR     2025250     91400   14.8200 -119.3300      19.9        46       181       100
IR     2025250     91400   14.8000 -119.5200      20.6        45       188        95
IR     2025250     91400   14.8200 -119.5800      18.2        42       192        99
IR     2025250     91400   14.8200 -119.6500      18.1        40       194        99
IR     2025250     91400   14.9100 -109.5100       7.3        34       197        99
IR     2025250     91400   14.9200 -109.8700       6.3        78       218        99
IR     2025250     91400   14.9600 -110.0300       4.1       125       219        76
IR     2025250     91400   14.8900 -110.9500       5.6        51       230        93
IR     2025250     91400   14.8900 -111.0900       8.7        58       232        98
IR     2025250     91400   14.9100 -111.1100       8.8        58       232        98
IR     2025250     91400   14.8700 -111.2800      10.1        54       250        94
IR     2025250     91400   14.8800 -111.6500       4.1       352       231        94
IR     2025250     91400   14.8900 -111.7400       4.5       351       226        97
IR     2025250     91400   14.8400 -113.2700       5.8        17       176        68
IR     2025250     91400   14.8900 -113.3800       9.2        25       173        67
IR     2025250     91400   14.8900 -113.5800      16.3        21       166        99
IR     2025250     91400   14.8700 -113.6700      15.9        23       166       100
IR     2025250     91400   14.8800 -113.7600      13.2        20       168        97
IR     2025250     91400   14.8000 -113.9100       6.9        11       179        90
IR     2025250     91400   14.8800 -113.9600       7.8        10       185        98
IR     2025250     91400   14.7600 -116.0700      10.7        43       209        96
IR     2025250     91400   14.7500 -116.1100      10.0        39       225        99
IR     2025250     91400   14.8300 -116.2100      12.1        36       227       100
IR     2025250     91400   14.7800 -117.4400       9.0        44       189        98
IR     2025250     91400   14.8000 -117.5000       7.7        55       191        82
IR     2025250     91400   14.7200 -117.7000      10.1        37       195        99
IR     2025250     91400   14.7400 -117.8100      11.5        34       193       100
IR     2025250     91400   14.8000 -117.8600      11.4        32       191       100
IR     2025250     91400   14.7900 -117.9300      12.8        33       189       100
IR     2025250     91400   14.7300 -118.0600      15.4        33       190        95
IR     2025250     91400   14.7300 -118.1500      16.1        35       188        98
IR     2025250     91400   14.7100 -118.3000      15.4        38       186        89
IR     2025250     91400   14.7800 -118.4400      13.4        30       182        88
IR     2025250     91400   14.7800 -118.5200      13.1        25       180        98
IR     2025250     91400   14.7800 -118.6500      15.3        28       178       100
IR     2025250     91400   14.7400 -118.7400      18.2        30       182        98
IR     2025250     91400   14.7200 -118.7800      19.3        31       184        98
IR     2025250     91400   14.7100 -119.1600      18.5        34       174       100
IR     2025250     91400   14.7100 -119.1800      18.6        34       175       100
IR     2025250     91400   14.7400 -119.5300      19.2        45       185        99
IR     2025250     91400   14.7600 -119.6100      17.9        40       187        99
IR     2025250     91400   14.7600 -119.7400      18.0        35       183        99
IR     2025250     91400   14.7400 -119.8400      17.5        34       181        91
IR     2025250     91400   14.8900 -109.4900       7.5        38       195       100
IR     2025250     91400   14.8800 -109.8500       6.4        83       218        99
IR     2025250     91400   14.8600 -110.9400       5.3        46       232        91
IR     2025250     91400   14.8500 -111.1000      10.1        55       234        99
IR     2025250     91400   14.7700 -111.1800      16.6        46       256        71
IR     2025250     91400   14.8500 -111.2900      10.3        52       254        93
IR     2025250     91400   14.8400 -111.7000       4.2       347       230        93
IR     2025250     91400   14.7900 -112.9000       5.4       354       191        76
IR     2025250     91400   14.7900 -112.9700       6.2         1       189        66
IR     2025250     91400   14.7200 -113.1800       7.5        12       177        95
IR     2025250     91400   14.7200 -113.3400       8.7         8       167        96
IR     2025250     91400   14.7400 -113.4200      11.2        15       165        92
IR     2025250     91400   14.7300 -113.5800      12.5        16       163        99
IR     2025250     91400   14.7800 -113.9100       6.3        10       202        88
IR     2025250     91400   14.7500 -114.3600       6.1       204       231        60
IR     2025250     91400   14.7700 -114.4400       4.6       214       235        77
IR     2025250     91400   14.6600 -115.9900      11.4        37       205       100
IR     2025250     91400   14.7000 -116.0300      10.7        40       208       100
IR     2025250     91400   14.7300 -116.1100       9.7        38       226       100
IR     2025250     91400   14.6800 -116.8100      12.3        35       201        98
IR     2025250     91400   14.6600 -116.9600       7.0        40       228        83
IR     2025250     91400   14.6400 -117.0500       5.0        46       233        84
IR     2025250     91400   14.7100 -117.4300      11.7        36       192        97
IR     2025250     91400   14.6900 -117.4500      11.2        35       194        95
IR     2025250     91400   14.6300 -117.5900       9.5        39       198        90
IR     2025250     91400   14.6400 -117.6700       9.7        39       199        98
IR     2025250     91400   14.6800 -117.8600      12.6        33       191        99
IR     2025250     91400   14.6400 -117.9700      16.1        40       190        98
IR     2025250     91400   14.6600 -118.0500      16.1        37       191        98
IR     2025250     91400   14.6200 -118.1600      15.8        38       190        97
IR     2025250     91400   14.6300 -118.2400      14.8        39       188        87
IR     2025250     91400   14.6100 -118.3500      15.5        43       186        95
IR     2025250     91400   14.6100 -118.4400      17.1        45       183        95
IR     2025250     91400   14.6300 -118.5400      16.5        39       179       100
IR     2025250     91400   14.6400 -118.7100      18.9        32       179       100
IR     2025250     91400   14.6400 -118.7300      19.3        32       180       100
IR     2025250     91400   14.6600 -118.8700      20.1        34       185        97
IR     2025250     91400   14.6000 -119.0000      19.6        37       177        93
IR     2025250     91400   14.6400 -119.1300      19.2        36       172       100
IR     2025250     91400   14.5900 -119.2400      19.4        36       175       100
IR     2025250     91400   14.6300 -119.2900      19.4        35       176       100
IR     2025250     91400   14.6100 -119.4400      19.7        39       183        97
IR     2025250     91400   14.6100 -119.4600      19.6        40       183        96
IR     2025250     91400   14.6300 -119.6500      17.9        39       181        99
IR     2025250     91400   14.5900 -119.6900      18.3        41       181        98
IR     2025250     91400   14.7100 -109.6200       9.4        75       206        98
IR     2025250     91400   14.7100 -109.6500       9.1        76       210        95
IR     2025250     91400   14.7300 -109.8600       4.4       117       253        98
IR     2025250     91400   14.7000 -111.0300      20.3        46       248       100
IR     2025250     91400   14.6700 -111.1500      17.4        44       265        70
IR     2025250     91400   14.7300 -111.1700      20.2        46       256       100
IR     2025250     91400   14.6700 -111.3600       7.6        28       271        78
IR     2025250     91400   14.6800 -112.6200       5.0        24       208        88
IR     2025250     91400   14.6900 -112.7800       5.8       358       190        97
IR     2025250     91400   14.6500 -112.9200       7.9        12       182       100
IR     2025250     91400   14.6700 -113.1000      11.0        23       177        97
IR     2025250     91400   14.6700 -113.1200      10.3        21       177        93
IR     2025250     91400   14.7000 -113.3200       8.2         4       167        95
IR     2025250     91400   14.6200 -113.3500       9.9         5       165        72
IR     2025250     91400   14.6400 -113.5100      10.3         8       161        84
IR     2025250     91400   14.6900 -113.5700      10.5        11       163        77
IR     2025250     91400   14.5800 -115.1600      14.9        23       188        96
IR     2025250     91400   14.5800 -115.2200      15.1        21       185        87
IR     2025250     91400   14.6400 -115.3000      15.1        19       186        99
IR     2025250     91400   14.5800 -115.9200      14.8        38       210        97
IR     2025250     91400   14.6000 -116.8600       9.2        31       205        99
IR     2025250     91400   14.6200 -116.9500       6.5        31       231        86
IR     2025250     91400   14.6200 -116.9900       5.6        34       233        84
IR     2025250     91400   14.5700 -117.3400       8.9        41       206        86
IR     2025250     91400   14.6100 -117.4200      12.0        35       199        94
IR     2025250     91400   14.5300 -117.5800      10.3        35       202        96
IR     2025250     91400   14.5300 -117.7100      10.1        40       203        98
IR     2025250     91400   14.5300 -117.7500       9.4        43       203       100
IR     2025250     91400   14.5200 -117.8800      11.5        43       198        98
IR     2025250     91400   14.5800 -118.0400      16.0        38       189        99
IR     2025250     91400   14.5800 -118.1500      15.7        37       188        99
IR     2025250     91400   14.5800 -118.2300      15.3        38       187        98
IR     2025250     91400   14.5900 -118.3300      15.2        43       187        94
IR     2025250     91400   14.5300 -118.4500      18.7        44       185       100
IR     2025250     91400   14.5500 -118.4900      18.9        44       183        98
IR     2025250     91400   14.5500 -118.6500      20.9        36       178        99
IR     2025250     91400   14.5100 -118.7900      19.4        31       182        98
IR     2025250     91400   14.5200 -118.8700      18.8        31       183        96
IR     2025250     91400   14.5000 -119.0000      19.2        37       184        81
IR     2025250     91400   14.5200 -119.0400      19.2        39       182        86
IR     2025250     91400   14.5600 -119.1600      19.8        39       174       100
IR     2025250     91400   14.5700 -119.3000      19.4        36       177       100
IR     2025250     91400   14.5700 -119.3800      19.8        37       180       100
IR     2025250     91400   14.5500 -119.4700      19.9        39       183        96
IR     2025250     91400   14.5500 -119.6000      18.8        41       183        96
IR     2025250     91400   14.5300 -119.6600      18.9        44       181        99
IR     2025250     91400   14.6100 -110.7000       4.6       282       252        80
IR     2025250     91400   14.6600 -111.1300      20.2        44       261       100
IR     2025250     91400   14.6600 -111.1600      17.0        44       267        68
IR     2025250     91400   14.5600 -112.6400       6.7        32       191        90
IR     2025250     91400   14.5800 -112.8400       7.0         3       181        64
IR     2025250     91400   14.5900 -112.8600       7.8         5       181        92
IR     2025250     91400   14.6100 -113.0600      11.9        26       176        99
IR     2025250     91400   14.6100 -113.0900      12.0        26       176       100
IR     2025250     91400   14.6100 -113.2000      10.3        15       170        83
IR     2025250     91400   14.5200 -113.4100       9.5         8       158        65
IR     2025250     91400   14.5800 -113.4700      11.6        12       158        68
IR     2025250     91400   14.5500 -114.7900       4.3       352       195        62
IR     2025250     91400   14.5100 -114.9900      13.1        22       193        82
IR     2025250     91400   14.5600 -115.2000      15.1        22       185        93
IR     2025250     91400   14.5600 -115.2200      15.3        22       184        89
IR     2025250     91400   14.4800 -115.4300      11.6        29       184        87
IR     2025250     91400   14.5000 -115.4500      12.8        29       186        98
IR     2025250     91400   14.5500 -115.9000      15.6        34       214        99
IR     2025250     91400   14.5400 -116.0300      12.6        32       236        99
IR     2025250     91400   14.5300 -116.8800      10.0        31       210        99
IR     2025250     91400   14.5200 -117.0000       5.2        31       233        96
IR     2025250     91400   14.4400 -117.0600       4.2        48       249        94
IR     2025250     91400   14.4400 -117.1600       4.3        66       247        95
IR     2025250     91400   14.5100 -117.6900      10.8        39       204        98
IR     2025250     91400   14.4500 -117.8400       9.0        51       205        90
IR     2025250     91400   14.4200 -118.1000      11.4        33       187        89
IR     2025250     91400   14.5000 -118.1600      14.3        32       188        99
IR     2025250     91400   14.4200 -118.2900      12.9        15       190        78
IR     2025250     91400   14.4200 -118.4000      16.0        28       188        94
IR     2025250     91400   14.4300 -118.9400      16.9        33       184        75
IR     2025250     91400   14.4500 -118.9600      18.1        34       184        72
IR     2025250     91400   14.4600 -119.0800      19.0        40       182        88
IR     2025250     91400   14.4600 -119.2500      19.7        40       178       100
IR     2025250     91400   14.4600 -119.3100      19.6        39       179       100
IR     2025250     91400   14.4000 -119.4500      15.9        42       180        97
IR     2025250     91400   14.4200 -119.4900      16.9        42       182        96
IR     2025250     91400   14.4700 -119.6700      18.7        44       181       100
IR     2025250     91400   14.4100 -119.7800      18.2        46       179        99
WVCT   2025250     91400   23.9200 -107.2600      14.1        39       204        83
WVCT   2025250     91400   23.9200 -107.2900      14.7        38       205        80
WVCT   2025250     91400   23.9300 -107.4100      15.8        38       206        86
WVCT   2025250     91400   23.8800 -108.0500      17.3        66       182        88
WVCT   2025250     91400   23.9000 -108.0700      16.6        67       182        91
WVCT   2025250     91400   23.8700 -108.3100      14.4        67       174       100
WVCT   2025250     91400   23.8700 -108.3400      13.9        67       173       100
WVCT   2025250     91400   23.8600 -108.5700       7.8        58       151        62
WVCT   2025250     91400   23.8800 -108.7000      12.1        63       154        78
WVCT   2025250     91400   23.8600 -108.7300      12.3        66       156        72
WVCT   2025250     91400   23.8700 -108.8500      11.9        61       169        81
WVCT   2025250     91400   23.8600 -109.0800      12.9        60       180        83
WVCT   2025250     91400   23.8800 -109.1000      14.1        63       181        87
WVCT   2025250     91400   23.8300 -109.2500      17.3        52       184        71
WVCT   2025250     91400   23.7800 -109.4400       9.2        73       195        97
WVCT   2025250     91400   23.8400 -109.6000      10.3        35       189        99
WVCT   2025250     91400   23.8100 -109.7100       8.3        24       209        98
WVCT   2025250     91400   23.8100 -109.8600       5.5       350       214        78
WVCT   2025250     91400   23.8300 -109.9300       6.4       345       195        78
WVCT   2025250     91400   23.8400 -110.0000       7.1       346       190        95
WVCT   2025250     91400   23.7800 -110.4900       8.6        78       185        64
WVCT   2025250     91400   23.8200 -110.5000       8.6        77       188        65
WVCT   2025250     91400   23.7100 -111.2500       6.2        46       177        85
WVCT   2025250     91400   23.7500 -111.2700       4.3        49       175        83
WVCT   2025250     91400   23.7000 -111.4000       5.2        19       200        84
WVCT   2025250     91400   23.6800 -112.0900       5.3       122       179        98
WVCT   2025250     91400   23.7600 -112.1400       5.3       126       188       100
WVCT   2025250     91400   23.6700 -112.3600      11.2       118       181        85
WVCT   2025250     91400   23.7000 -112.5000      11.0       138       175        73
WVCT   2025250     91400   23.6400 -113.1100       4.5       131       176        81
WVCT   2025250     91400   23.6300 -113.3100       8.5       128       226        77
WVCT   2025250     91400   23.6300 -113.4500       9.0       132       216        83
WVCT   2025250     91400   23.6900 -113.4600       9.1       116       185        97
WVCT   2025250     91400   23.6400 -113.6800       6.5       144       176        99
WVCT   2025250     91400   23.7000 -113.7600       7.3       157       171        87
WVCT   2025250     91400   23.6100 -113.9100       7.4       125       169        98
WVCT   2025250     91400   23.6400 -114.1600      10.4       160       179        89
WVCT   2025250     91400   23.6600 -114.2000      11.1       169       198        95
WVCT   2025250     91400   23.6600 -114.3400      13.2       170       231        78
WVCT   2025250     91400   23.6800 -114.4100      12.5       168       233        68
WVCT   2025250     91400   23.5700 -114.8800       8.9       158       262        96
WVCT   2025250     91400   23.5900 -114.9200      10.4       163       240        99
WVCT   2025250     91400   23.5700 -115.1100      11.4       164       225        97
WVCT   2025250     91400   23.5700 -115.1400      10.6       162       229        99
WVCT   2025250     91400   23.6300 -115.7000      11.0       153       223       100
WVCT   2025250     91400   23.5400 -115.8100      10.2       164       205        76
WVCT   2025250     91400   23.5200 -116.3700       8.5       179       233        91
WVCT   2025250     91400   23.5200 -116.4400       9.1       166       217        98
WVCT   2025250     91400   23.5800 -116.5400       9.7       154       224        93
WVCT   2025250     91400   23.5600 -117.7900       7.1       195       198        79
WVCT   2025250     91400   23.5600 -117.9300       9.6       211       200        70
WVCT   2025250     91400   23.7700 -107.2600       8.3        53       208        60
WVCT   2025250     91400   23.7600 -107.4400      18.0        29       207        79
WVCT   2025250     91400   23.7800 -108.0600      18.7        76       180        94
WVCT   2025250     91400   23.7300 -108.1300      16.8        70       180        92
WVCT   2025250     91400   23.7200 -108.3600      13.6        72       175       100
WVCT   2025250     91400   23.7400 -108.3800      12.8        71       173        99
WVCT   2025250     91400   23.7800 -108.6000       6.2        54       156        60
WVCT   2025250     91400   23.7500 -108.6400       6.2        59       156        61
WVCT   2025250     91400   23.7900 -108.8500      12.1        76       167        75
WVCT   2025250     91400   23.7900 -108.8800      12.1        74       168        85
WVCT   2025250     91400   23.7500 -109.1200      12.4        44       179        79
WVCT   2025250     91400   23.7300 -109.1800      12.4        43       180        65
WVCT   2025250     91400   23.6800 -109.4000       8.2        60       182        65
WVCT   2025250     91400   23.6800 -109.4200       7.6        63       183        72
WVCT   2025250     91400   23.7300 -109.7100       6.3        15       216        72
WVCT   2025250     91400   23.6600 -109.8300       6.1         9       214        87
WVCT   2025250     91400   23.7200 -110.0100       5.0         2       191        96
WVCT   2025250     91400   23.6900 -110.0400       4.6         5       186        94
WVCT   2025250     91400   23.6800 -110.3500       5.2        79       181        95
WVCT   2025250     91400   23.6200 -110.7900       7.5        38       178        63
WVCT   2025250     91400   23.6400 -111.8800       4.9       126       169        88
WVCT   2025250     91400   23.5800 -112.0000       6.2       131       173        99
WVCT   2025250     91400   23.6400 -112.0600       5.5       122       178       100
WVCT   2025250     91400   23.5700 -112.2400       6.7       129       181        93
WVCT   2025250     91400   23.6000 -112.3800      10.4       113       181        75
WVCT   2025250     91400   23.6200 -112.4000      10.9       116       180        82
WVCT   2025250     91400   23.5500 -112.7600       7.1       158       169        84
WVCT   2025250     91400   23.5500 -112.7800       7.5       157       171        79
WVCT   2025250     91400   23.5400 -113.0000       7.1       125       175        73
WVCT   2025250     91400   23.6000 -113.0300       4.5       132       176        93
WVCT   2025250     91400   23.5500 -113.2100       8.6       142       226        76
WVCT   2025250     91400   23.5200 -113.3600      10.4       144       228        87
WVCT   2025250     91400   23.6000 -113.4600       9.1       135       218        86
WVCT   2025250     91400   23.5800 -113.5600       7.8       141       184        99
WVCT   2025250     91400   23.5800 -113.6100       7.2       143       181        96
WVCT   2025250     91400   23.5100 -113.8400       6.7       160       175        86
WVCT   2025250     91400   23.5200 -113.9500      12.7       186       221       100
WVCT   2025250     91400   23.5600 -114.0100      13.3       181       181        95
WVCT   2025250     91400   23.5800 -114.1700      13.8       176       221        98
WVCT   2025250     91400   23.5500 -114.2500      14.0       170       225        83
WVCT   2025250     91400   23.5500 -114.3400      13.6       168       229        68
WVCT   2025250     91400   23.5700 -114.4300      12.6       166       233        64
WVCT   2025250     91400   23.5500 -114.8800       9.2       161       265        97
WVCT   2025250     91400   23.5300 -114.9300      11.0       166       250        98
WVCT   2025250     91400   23.5200 -115.1000      11.3       161       225        88
WVCT   2025250     91400   23.5400 -115.1400      10.2       161       232       100
WVCT   2025250     91400   23.4400 -115.8100      13.0       176       216        76
WVCT   2025250     91400   23.4300 -115.8800      13.8       176       215        89
WVCT   2025250     91400   23.4200 -116.3000      11.4       170       218        89
WVCT   2025250     91400   23.4200 -116.3900      11.1       168       217        99
WVCT   2025250     91400   23.4200 -116.4400      10.9       168       216        98
WVCT   2025250     91400   23.4100 -116.6200       6.3       147       208        65
WVCT   2025250     91400   23.4100 -116.6900       4.6       139       214        71
WVCT   2025250     91400   23.4500 -118.0600       7.8       159       209        65
WVCT   2025250     91400   23.6600 -107.3500       6.2       127       211        71
WVCT   2025250     91400   23.7000 -107.4100       5.8       126       211        63
WVCT   2025250     91400   23.7100 -108.1100      18.0        71       180        83
WVCT   2025250     91400   23.6200 -108.3200      13.6        66       178        99
WVCT   2025250     91400   23.6500 -108.4600      11.3        71       173        96
WVCT   2025250     91400   23.6300 -108.6000       7.3        58       165        90
WVCT   2025250     91400   23.6000 -108.6600       6.2        54       164        92
WVCT   2025250     91400   23.6600 -108.9500       7.0        72       166        77
WVCT   2025250     91400   23.6600 -109.4000       7.5        56       182        62
WVCT   2025250     91400   23.6400 -109.7600       6.7        18       215        86
WVCT   2025250     91400   23.5800 -109.8600       6.9       360       211        82
WVCT   2025250     91400   23.5700 -110.0100       5.4       344       193        90
WVCT   2025250     91400   23.6100 -110.1200       4.0         6       183        95
WVCT   2025250     91400   23.6000 -110.3700       4.4        80       179        88
WVCT   2025250     91400   23.6200 -110.4200       6.8        91       180        96
WVCT   2025250     91400   23.5600 -110.6600       7.5        38       177        64
WVCT   2025250     91400   23.5600 -110.6800       7.0        29       177        77
WVCT   2025250     91400   23.6000 -110.7900       6.8        33       177        79
WVCT   2025250     91400   23.5700 -110.9200       6.4        30       178        81
WVCT   2025250     91400   23.4800 -111.7800       6.0       115       175        77
WVCT   2025250     91400   23.4800 -111.8100       6.2       115       175        76
WVCT   2025250     91400   23.5500 -111.9800       6.5       132       172       100
WVCT   2025250     91400   23.5100 -112.1400       5.1       135       178        97
WVCT   2025250     91400   23.5000 -112.1900       5.5       135       178        92
WVCT   2025250     91400   23.5400 -112.4000       9.6       115       176        80
WVCT   2025250     91400   23.5300 -112.7600       6.8       164       171        87
WVCT   2025250     91400   23.5200 -112.9800       7.9       135       175        76
WVCT   2025250     91400   23.4700 -113.1600       9.5       141       183        62
WVCT   2025250     91400   23.5000 -113.3600      10.9       147       228        82
WVCT   2025250     91400   23.4100 -113.5500       7.1       137       225        76
WVCT   2025250     91400   23.3900 -114.0800      10.9       170       231        88
WVCT   2025250     91400   23.4100 -114.1000      11.2       168       231        83
WVCT   2025250     91400   23.4700 -114.2700      14.1       168       227        83
WVCT   2025250     91400   23.4700 -114.3400      13.5       167       230        83
WVCT   2025250     91400   23.4400 -115.0700      11.4       161       238        80
WVCT   2025250     91400   23.3600 -115.5300      10.6       175       226        86
WVCT   2025250     91400   23.3400 -115.6500      14.1       181       200        94
WVCT   2025250     91400   23.3600 -115.6900      13.4       180       200        91
WVCT   2025250     91400   23.3700 -115.8500      14.4       174       202        93
WVCT   2025250     91400   23.3300 -115.9100      15.4       171       203        95
WVCT   2025250     91400   23.3200 -116.2100      14.5       166       205        87
WVCT   2025250     91400   23.3800 -116.3100      13.6       170       217        99
WVCT   2025250     91400   23.4000 -116.3700      12.1       168       218        99
WVCT   2025250     91400   23.3100 -116.4900      11.9       167       222        86
WVCT   2025250     91400   23.3700 -116.5900       8.7       152       222        90
WVCT   2025250     91400   23.3200 -116.7300       8.0       147       210        94
WVCT   2025250     91400   23.5600 -108.1100      16.0        67       183        97
WVCT   2025250     91400   23.5200 -108.2300      14.3        61       182        93
WVCT   2025250     91400   23.6000 -108.3300      13.3        68       178       100
WVCT   2025250     91400   23.5200 -108.5300       6.2        65       178        97
WVCT   2025250     91400   23.5500 -108.8300       5.3        33       165        67
WVCT   2025250     91400   23.4600 -109.6200       7.4       357       217        74
WVCT   2025250     91400   23.5300 -109.9200       7.1       343       209        90
WVCT   2025250     91400   23.4800 -110.0300       7.1       329       193        61
WVCT   2025250     91400   23.5200 -110.3000       4.4         4       179        81
WVCT   2025250     91400   23.4300 -110.3700       6.1       351       176        89
WVCT   2025250     91400   23.4200 -110.7000       4.6        40       176        72
WVCT   2025250     91400   23.3700 -111.7400       4.7        92       176        95
WVCT   2025250     91400   23.4500 -111.8400       6.2       113       176        74
WVCT   2025250     91400   23.4500 -111.9400       5.7       115       177        82
WVCT   2025250     91400   23.4000 -112.0700       4.1       135       180        62
WVCT   2025250     91400   23.4000 -112.2400       5.1       147       207        68
WVCT   2025250     91400   23.3700 -112.3200       4.6       144       185        74
WVCT   2025250     91400   23.4100 -112.4800       6.5       110       172        68
WVCT   2025250     91400   23.3600 -112.5600       5.9       103       175        89
WVCT   2025250     91400   23.3300 -112.7900       8.3       199       179        62
WVCT   2025250     91400   23.3300 -112.8400      10.3       208       180        60
WVCT   2025250     91400   23.3700 -113.4900       9.2       129       231        77
WVCT   2025250     91400   23.3900 -113.5600       7.1       133       226        90
WVCT   2025250     91400   23.3900 -113.7000       6.8       141       175        93
WVCT   2025250     91400   23.3800 -113.8000       6.9       141       179        74
WVCT   2025250     91400   23.2900 -113.9900       9.5       180       201        70
WVCT   2025250     91400   23.2900 -114.1100      10.3       172       224        98
WVCT   2025250     91400   23.2900 -114.1300      10.4       170       227        97
WVCT   2025250     91400   23.3700 -114.2300      11.9       171       233        92
WVCT   2025250     91400   23.3000 -114.4600      12.9       168       242        98
WVCT   2025250     91400   23.2900 -114.4800      12.8       168       241        96
WVCT   2025250     91400   23.3100 -114.5900      11.7       166       240        89
WVCT   2025250     91400   23.2400 -115.4000      14.9       169       209        95
WVCT   2025250     91400   23.2600 -115.5100      14.3       173       205        99
WVCT   2025250     91400   23.2800 -115.5500      14.0       176       203        99
WVCT   2025250     91400   23.3200 -115.6300      14.2       180       198        97
WVCT   2025250     91400   23.2300 -115.8600      17.0       166       200        83
WVCT   2025250     91400   23.3100 -115.9100      15.8       170       203        93
WVCT   2025250     91400   23.2400 -116.0400      16.7       165       201        85
WVCT   2025250     91400   23.2800 -116.1700      14.5       165       200        84
WVCT   2025250     91400   23.3000 -116.2100      14.3       167       205        89
WVCT   2025250     91400   23.2300 -116.3400      12.1       173       208        97
WVCT   2025250     91400   23.2500 -116.4500      11.8       170       221        78
WVCT   2025250     91400   23.2200 -116.6700      12.4       162       208        91
WVCT   2025250     91400   23.2400 -116.6800      11.3       160       208        96
WVCT   2025250     91400   23.2300 -116.8900      10.2       150       208        76
WVCT   2025250     91400   23.4400 -108.5600       5.2        43       178        66
WVCT   2025250     91400   23.4600 -108.5800       4.6        35       179        77
WVCT   2025250     91400   23.4700 -108.8000       5.0         9       173        84
WVCT   2025250     91400   23.4000 -108.9300       5.7       359       178        91
WVCT   2025250     91400   23.3800 -109.0400       5.0        19       185        77
WVCT   2025250     91400   23.3800 -109.4600       5.9         5       222        83
WVCT   2025250     91400   23.4000 -109.4800       5.8        12       220        79
WVCT   2025250     91400   23.4400 -109.6000       7.4       357       217        70
WVCT   2025250     91400   23.3500 -109.7800       7.5       305       207        77
WVCT   2025250     91400   23.3600 -109.9000       7.6       328       204        78
WVCT   2025250     91400   23.3800 -110.0400       7.7       319       197        81
WVCT   2025250     91400   23.3900 -110.7100       4.3        44       175        69
WVCT   2025250     91400   23.2700 -111.8400       5.0       118       176        90
WVCT   2025250     91400   23.2900 -111.8600       5.0       123       176        88
WVCT   2025250     91400   23.2600 -113.1700       7.5       139       189        88
WVCT   2025250     91400   23.2800 -113.1900       8.0       141       189        84
WVCT   2025250     91400   23.2100 -113.3500      11.3       153       233        63
WVCT   2025250     91400   23.2000 -113.4900      10.1       144       240        71
WVCT   2025250     91400   23.2000 -113.5600       8.1       126       240        87
WVCT   2025250     91400   23.1900 -113.7500       7.0       138       205        93
WVCT   2025250     91400   23.2100 -113.8400       8.1       167       198        85
WVCT   2025250     91400   23.2700 -113.9900       9.8       182       199        73
WVCT   2025250     91400   23.1800 -114.1300      10.7       168       202        85
WVCT   2025250     91400   23.2700 -114.1300      10.5       170       224        96
WVCT   2025250     91400   23.2600 -114.3500      13.8       171       240       100
WVCT   2025250     91400   23.1700 -114.4400      14.4       166       232        99
WVCT   2025250     91400   23.2500 -114.5600      13.7       166       234        97
WVCT   2025250     91400   23.2300 -114.6100      14.1       165       233        96
WVCT   2025250     91400   23.2000 -114.8300      12.2       185       236        85
WVCT   2025250     91400   23.1700 -115.1900      12.6       177       228        63
WVCT   2025250     91400   23.1400 -115.3100      14.0       169       204        81
WVCT   2025250     91400   23.1800 -115.4100      14.6       168       191        98
WVCT   2025250     91400   23.2200 -115.4500      14.8       171       202        98
WVCT   2025250     91400   23.2100 -115.6100      14.5       173       181        94
WVCT   2025250     91400   23.2100 -115.7300      15.5       167       181        94
WVCT   2025250     91400   23.1200 -115.8900      14.7       154       204        97
WVCT   2025250     91400   23.1200 -116.0000      13.6       159       202        92
WVCT   2025250     91400   23.1600 -116.0200      16.0       163       201        89
WVCT   2025250     91400   23.1100 -116.1400      12.3       163       182        86
WVCT   2025250     91400   23.1500 -116.3200      12.0       177       189        95
WVCT   2025250     91400   23.1900 -116.3500      11.6       178       208        91
WVCT   2025250     91400   23.1800 -116.5600      11.4       176       208        89
WVCT   2025250     91400   23.1400 -116.6600      12.7       166       205        91
WVCT   2025250     91400   23.1800 -116.7200      13.6       161       205        84
WVCT   2025250     91400   23.1500 -116.8600      13.3       140       206        63
WVCT   2025250     91400   23.3300 -108.2100      12.5        61       181        60
WVCT   2025250     91400   23.3000 -108.3500      12.4        77       180        96
WVCT   2025250     91400   23.3000 -108.3700      12.2        80       180        95
WVCT   2025250     91400   23.3800 -108.5500       5.9        40       179        65
WVCT   2025250     91400   23.3500 -108.6100       5.7        20       176        69
WVCT   2025250     91400   23.3000 -108.8300       6.8       352       187        84
WVCT   2025250     91400   23.2800 -108.8900       7.8         1       187        92
WVCT   2025250     91400   23.3500 -109.0700       5.0        17       186        84
WVCT   2025250     91400   23.3500 -109.2200       5.1        16       183        89
WVCT   2025250     91400   23.3000 -109.2900       6.2       358       188        87
WVCT   2025250     91400   23.2800 -109.4000       6.4       348       215        70
WVCT   2025250     91400   23.2900 -109.5400       5.8       349       220        69
WVCT   2025250     91400   23.2500 -109.6800       6.2       303       211        74
WVCT   2025250     91400   23.3000 -109.7600       6.3       308       208        95
WVCT   2025250     91400   23.2700 -110.0000       6.9       322       203        88
WVCT   2025250     91400   23.3000 -110.3900       8.0       355       176        91
WVCT   2025250     91400   23.2100 -110.5900       4.3        69       175        76
WVCT   2025250     91400   23.1700 -112.7900       8.2       115       183        99
WVCT   2025250     91400   23.2100 -112.9000       8.7       145       182        68
WVCT   2025250     91400   23.2000 -112.9900       8.5       142       187        77
WVCT   2025250     91400   23.1100 -113.2100       8.4       126       190        98
WVCT   2025250     91400   23.1700 -113.3100       9.4       142       196        75
WVCT   2025250     91400   23.1900 -113.3500      11.5       152       233        63
WVCT   2025250     91400   23.1000 -113.4900       8.2       146       238        79
WVCT   2025250     91400   23.1600 -113.6400       6.5       117       232        93
WVCT   2025250     91400   23.1500 -113.7400       6.5       130       207        86
WVCT   2025250     91400   23.1700 -113.8100       7.4       154       204        84
WVCT   2025250     91400   23.0800 -113.9500       9.2       148       201        73
WVCT   2025250     91400   23.1600 -114.1400      10.9       167       200        77
WVCT   2025250     91400   23.1600 -114.1600      11.4       165       222        78
WVCT   2025250     91400   23.0900 -114.3900      15.4       161       226        92
WVCT   2025250     91400   23.1500 -114.4200      14.8       164       231        97
WVCT   2025250     91400   23.1000 -114.5700      13.9       168       226        95
WVCT   2025250     91400   23.0800 -114.6500      13.6       169       229        96
WVCT   2025250     91400   23.1200 -114.7600      14.2       167       229        99
WVCT   2025250     91400   23.1300 -114.9200      10.2       181       231        98
WVCT   2025250     91400   23.0400 -115.1000      11.7       172       203        97
WVCT   2025250     91400   23.0800 -115.2100      12.2       174       204        86
WVCT   2025250     91400   23.0800 -115.2300      12.2       173       203        87
WVCT   2025250     91400   23.1200 -115.3800      13.8       163       191        99
WVCT   2025250     91400   23.0500 -115.5600      11.5       142       190        74
WVCT   2025250     91400   23.0300 -115.6100      11.0       141       192        82
WVCT   2025250     91400   23.0600 -115.7900      12.5       153       192        98
WVCT   2025250     91400   23.0600 -115.8800      12.0       146       213        97
WVCT   2025250     91400   23.0800 -116.0100      11.9       156       205        85
WVCT   2025250     91400   23.0500 -116.0400      10.1       156       207        83
WVCT   2025250     91400   23.0900 -116.1500      11.4       161       184        78
WVCT   2025250     91400   23.0900 -116.2600       9.9       167       205        92
WVCT   2025250     91400   23.0800 -116.4500       8.7       181       208        72
WVCT   2025250     91400   23.0800 -116.5400       9.3       185       207        72
WVCT   2025250     91400   23.0500 -116.6300      11.2       184       205        85
WVCT   2025250     91400   23.0500 -116.8200      12.0       143       205        72
WVCT   2025250     91400   23.0200 -118.4400       5.3       277       209        90
WVCT   2025250     91400   23.2100 -107.9100      10.6        88       167        70
WVCT   2025250     91400   23.2000 -108.1500      14.0        63       179        69
WVCT   2025250     91400   23.2000 -108.3000      14.8        62       179        79
WVCT   2025250     91400   23.2800 -108.3800      12.7        80       179        99
WVCT   2025250     91400   23.2500 -108.4700      12.7        78       175       100
WVCT   2025250     91400   23.2600 -108.9000       8.5         4       187        90
WVCT   2025250     91400   23.2300 -108.9600       9.5       360       186        83
WVCT   2025250     91400   23.2400 -109.1800       7.8       354       182        76
WVCT   2025250     91400   23.2400 -109.2000       7.8       359       181        78
WVCT   2025250     91400   23.1500 -109.3800       6.6        16       201        78
WVCT   2025250     91400   23.2300 -109.4600       4.5       351       217        62
WVCT   2025250     91400   23.1400 -109.6900       6.7       291       211        70
WVCT   2025250     91400   23.1800 -109.8300       5.3       292       207        90
WVCT   2025250     91400   23.2100 -110.0400       6.5       319       199        90
WVCT   2025250     91400   23.2000 -110.2200       8.4       339       176        87
WVCT   2025250     91400   23.1300 -110.4400       4.8        30       175        74
WVCT   2025250     91400   23.1700 -110.5500       5.3        54       175        84
WVCT   2025250     91400   23.1900 -110.5900       4.6        69       175        80
WVCT   2025250     91400   23.0200 -112.8000       6.7       130       208        85
WVCT   2025250     91400   23.0600 -112.8400       6.9       116       208        88
WVCT   2025250     91400   23.1000 -112.9200      10.1       112       208        95
WVCT   2025250     91400   23.0700 -113.1500       9.7       121       190        90
WVCT   2025250     91400   23.0900 -113.1900       9.0       129       190        95
WVCT   2025250     91400   23.0000 -113.4000       9.0       134       228        66
WVCT   2025250     91400   23.0000 -113.4700       7.3       134       216        90
WVCT   2025250     91400   22.9900 -113.5400       6.3       151       231        87
WVCT   2025250     91400   22.9700 -114.2300      13.6       148       204        74
WVCT   2025250     91400   22.9700 -114.3000      14.0       157       196        89
WVCT   2025250     91400   23.0300 -114.3600      15.0       163       214        94
WVCT   2025250     91400   22.9600 -114.4900      13.7       168       203        97
WVCT   2025250     91400   23.0000 -114.6200      13.5       168       226        92
WVCT   2025250     91400   23.0300 -114.8000      11.7       159       229        96
WVCT   2025250     91400   22.9400 -114.9400      11.7       157       187        98
WVCT   2025250     91400   22.9400 -114.9600      12.1       161       186        98
WVCT   2025250     91400   22.9800 -115.0900      11.9       160       183        95
WVCT   2025250     91400   23.0200 -115.1700      11.8       167       201        97
WVCT   2025250     91400   22.9500 -115.3100       9.7       161       189        97
WVCT   2025250     91400   22.9600 -115.6000      10.3       128       204        60
WVCT   2025250     91400   22.9400 -115.6500       9.2       132       210        77
WVCT   2025250     91400   22.9200 -115.8000       7.4       143       211        73
WVCT   2025250     91400   22.9900 -115.9400       8.5       133       208        74
WVCT   2025250     91400   22.9900 -115.9900       7.2       137       208        79
WVCT   2025250     91400   22.9600 -116.3600       7.8       155       206        91
WVCT   2025250     91400   22.8800 -118.2200       4.0       195       198        76
WVCT   2025250     91400   22.8300 -118.3700       5.4       155       194        98
WVCT   2025250     91400   23.1800 -108.1600      14.0        66       180        70
WVCT   2025250     91400   23.0900 -108.2900      14.5        80       179        94
WVCT   2025250     91400   23.1300 -108.3300      14.6        64       176        83
WVCT   2025250     91400   23.1700 -108.5200      14.9        81       143        85
WVCT   2025250     91400   23.1200 -108.5800      17.1        82       142        82
WVCT   2025250     91400   23.0900 -108.7200      13.2        74       159        68
WVCT   2025250     91400   23.1000 -109.0500       8.5        15       176        88
WVCT   2025250     91400   23.1400 -109.1100       8.8         4       179        83
WVCT   2025250     91400   23.0500 -109.3400       8.2        31       179        73
WVCT   2025250     91400   23.1300 -109.3900       6.5        21       182        80
WVCT   2025250     91400   23.0400 -109.4900      10.3        36       213        78
WVCT   2025250     91400   23.1200 -109.7000       7.2       291       211        63
WVCT   2025250     91400   23.1000 -110.1700       9.0       338       176        81
WVCT   2025250     91400   23.1000 -110.2500       9.9       348       176        75
WVCT   2025250     91400   23.0700 -110.4300       5.4        21       175        61
WVCT   2025250     91400   23.0000 -110.5800       4.7        23       172        82
WVCT   2025250     91400   23.0400 -111.7900       4.7         2       174        69
WVCT   2025250     91400   23.0100 -111.8400       5.9       344       174        84
WVCT   2025250     91400   23.0300 -112.0300       4.8       306       179        74
WVCT   2025250     91400   22.9800 -112.7900       6.9       128       209        86
WVCT   2025250     91400   23.0000 -112.8100       7.0       129       208        84
WVCT   2025250     91400   22.9300 -113.0200       6.9        97       215        72
WVCT   2025250     91400   22.9900 -113.0500       9.1       102       191        66
WVCT   2025250     91400   22.9400 -113.3900       9.0       133       214        67
WVCT   2025250     91400   22.9600 -113.4100       8.6       133       213        61
WVCT   2025250     91400   22.8900 -113.5700       6.7       155       216        93
WVCT   2025250     91400   22.9400 -113.7500       7.7       161       241        61
WVCT   2025250     91400   22.9100 -114.2000      13.0       132       227        66
WVCT   2025250     91400   22.9500 -114.3100      13.6       156       189        87
WVCT   2025250     91400   22.8600 -114.3800      11.3       165       205        87
WVCT   2025250     91400   22.9200 -114.4800      13.8       173       196        92
WVCT   2025250     91400   22.9400 -114.5900      13.4       168       227        95
WVCT   2025250     91400   22.8900 -114.7400      10.4       158       225        99
WVCT   2025250     91400   22.8800 -114.9300      11.2       153       186        93
WVCT   2025250     91400   22.9000 -114.9500      11.9       155       186        95
WVCT   2025250     91400   22.9000 -115.0900      11.6       155       183        69
WVCT   2025250     91400   22.9100 -115.2500      10.2       158       183        85
WVCT   2025250     91400   22.8700 -115.3700       9.1       164       209        84
WVCT   2025250     91400   22.8800 -115.7600       7.9       130       211        68
WVCT   2025250     91400   22.8100 -115.9400       8.0       120       205        95
WVCT   2025250     91400   22.8900 -115.9900       7.3       144       208        73
WVCT   2025250     91400   22.7600 -117.3800       8.0       146       233        96
WVCT   2025250     91400   22.8100 -118.3500       6.4       158       192        89
WVCT   2025250     91400   22.8100 -118.3700       5.7       154       195        96
WVCT   2025250     91400   23.0800 -108.0300      14.1        97       171        65
WVCT   2025250     91400   23.0700 -108.1900      14.9        92       180        61
WVCT   2025250     91400   22.9800 -108.3500      12.4        95       178        95
WVCT   2025250     91400   23.0700 -108.3500      14.1        86       166        84
WVCT   2025250     91400   23.0600 -108.5800      16.4        90       137        79
WVCT   2025250     91400   23.0300 -108.6600      15.6        85       148        93
WVCT   2025250     91400   22.9600 -108.8400      12.0        81       162        97
WVCT   2025250     91400   22.9800 -108.9800       5.9        53       165        82
WVCT   2025250     91400   23.0400 -109.1200       5.5        22       176        72
WVCT   2025250     91400   22.9400 -109.3200       6.8        16       180        92
WVCT   2025250     91400   22.9900 -109.7600      10.0         2       198        80
WVCT   2025250     91400   22.9800 -110.5800       4.5        16       173        71
WVCT   2025250     91400   22.9200 -111.9900       4.7       330       176        64
WVCT   2025250     91400   22.8100 -112.8300       6.8       119       208        83
WVCT   2025250     91400   22.8300 -112.9200       7.0       116       191        75
WVCT   2025250     91400   22.8900 -112.9800       7.0       128       208        99
WVCT   2025250     91400   22.8100 -113.3100       7.6       132       210        82
WVCT   2025250     91400   22.8500 -113.3400       8.8       134       216        68
WVCT   2025250     91400   22.8300 -113.5400       6.9       150       217        82
WVCT   2025250     91400   22.8500 -113.5600       6.9       153       216        87
WVCT   2025250     91400   22.8200 -114.2500       9.7       130       230        65
WVCT   2025250     91400   22.8200 -114.3400       9.3       153       211        86
WVCT   2025250     91400   22.8400 -114.3800      11.0       164       208        85
WVCT   2025250     91400   22.7500 -114.5400      16.2       164       228        88
WVCT   2025250     91400   22.8300 -114.6400      14.9       162       227        95
WVCT   2025250     91400   22.7800 -114.8400      12.2       149       190        94
WVCT   2025250     91400   22.7800 -114.8600      12.2       147       189        93
WVCT   2025250     91400   22.8200 -115.0100      11.1       145       186        81
WVCT   2025250     91400   22.7300 -115.1300       9.0       152       189        89
WVCT   2025250     91400   22.7200 -115.2700      11.2       156       188        93
WVCT   2025250     91400   22.8100 -115.3400      10.1       157       203        88
WVCT   2025250     91400   22.8000 -115.4300       8.0       151       211        70
WVCT   2025250     91400   22.7900 -115.9200       8.1       114       207        87
WVCT   2025250     91400   22.6600 -117.2400       8.8       159       221        80
WVCT   2025250     91400   22.7200 -117.3400       9.8       138       233        94
WVCT   2025250     91400   22.7400 -117.3600       8.7       142       233        99
WVCT   2025250     91400   22.7000 -117.4800      10.6       151       230        98
WVCT   2025250     91400   22.6500 -117.6700      16.4       173       245        73
WVCT   2025250     91400   22.6500 -117.7100      15.9       173       245        71
WVCT   2025250     91400   22.8900 -108.0200       6.9       100       195        86
WVCT   2025250     91400   22.9600 -108.3500      11.7        97       178        96
WVCT   2025250     91400   22.9600 -108.3800      11.4        98       175        91
WVCT   2025250     91400   22.9100 -108.5200       9.3        91       163        84
WVCT   2025250     91400   22.9100 -108.6500      10.3        89       163        95
WVCT   2025250     91400   22.8600 -108.9000       8.4        86       172        89
WVCT   2025250     91400   22.8600 -108.9200       7.4        85       172        89
WVCT   2025250     91400   22.9300 -109.2500       4.3       354       179        77
WVCT   2025250     91400   22.9200 -109.3000       6.0         3       179        86
WVCT   2025250     91400   22.8700 -109.5200      13.4        34       178        65
WVCT   2025250     91400   22.8200 -109.9400       6.1       332       176       100
WVCT   2025250     91400   22.8000 -110.2900       5.1       110       173       100
WVCT   2025250     91400   22.8000 -110.3600       4.7       100       173        94
WVCT   2025250     91400   22.7900 -110.5400       4.4        93       173        83
WVCT   2025250     91400   22.7900 -110.6100       4.4        92       173        69
WVCT   2025250     91400   22.7700 -112.8000       4.9       136       207        93
WVCT   2025250     91400   22.7900 -112.8900       5.5       123       191        84
WVCT   2025250     91400   22.7700 -113.3200       6.5       127       216        97
WVCT   2025250     91400   22.7700 -113.4400       7.6       125       216        95
WVCT   2025250     91400   22.7700 -113.4800       7.8       126       224        92
WVCT   2025250     91400   22.6500 -114.5200      12.0       153       230        97
WVCT   2025250     91400   22.7300 -114.5200      15.8       164       229        89
WVCT   2025250     91400   22.7300 -114.6400      16.0       161       225        87
WVCT   2025250     91400   22.7200 -114.7800      12.5       156       191        89
WVCT   2025250     91400   22.6700 -114.9100      12.6       151       192       100
WVCT   2025250     91400   22.7100 -115.0200      10.6       149       192        96
WVCT   2025250     91400   22.7100 -115.1100       9.2       154       190        96
WVCT   2025250     91400   22.7000 -115.2500      11.1       159       188        96
WVCT   2025250     91400   22.6400 -115.3600      11.6       162       193        89
WVCT   2025250     91400   22.6300 -115.5400       8.8       154       208        89
WVCT   2025250     91400   22.6300 -115.6100       9.0       150       207       100
WVCT   2025250     91400   22.6200 -117.2000       8.9       169       220        84
WVCT   2025250     91400   22.6000 -117.3700      10.5       160       220       100
WVCT   2025250     91400   22.5500 -117.4900      10.9       153       203        99
WVCT   2025250     91400   22.5500 -117.5100      10.7       153       203        99
WVCT   2025250     91400   22.5500 -117.6200      11.2       160       219       100
WVCT   2025250     91400   22.6300 -117.7200      15.0       171       229        77
WVCT   2025250     91400   22.8300 -108.0900       4.7        62       233        63
WVCT   2025250     91400   22.8400 -108.3700      10.4        86       179        92
WVCT   2025250     91400   22.7900 -108.4900      11.2        88       179        98
WVCT   2025250     91400   22.7600 -108.5700      11.0        89       178        98
WVCT   2025250     91400   22.7800 -108.7200      10.8        93       173        99
WVCT   2025250     91400   22.7500 -108.8500      12.4        92       172        99
WVCT   2025250     91400   22.7700 -108.9500       7.0        77       176        89
WVCT   2025250     91400   22.7800 -109.2200       7.5       324       184        82
WVCT   2025250     91400   22.7700 -109.3700       8.9       345       180        74
WVCT   2025250     91400   22.8100 -109.4900      10.2        16       178        64
WVCT   2025250     91400   22.7600 -109.8000       6.8         0       176        68
WVCT   2025250     91400   22.7600 -109.8300       6.6         0       176        61
WVCT   2025250     91400   22.7900 -109.9400       6.1       333       176       100
WVCT   2025250     91400   22.7000 -110.3200       7.1       101       171        98
WVCT   2025250     91400   22.6900 -110.4400       8.1        94       170        97
WVCT   2025250     91400   22.6800 -110.6900       6.9       110       153        85
WVCT   2025250     91400   22.7600 -110.7900       4.3        89       171        94
WVCT   2025250     91400   22.6600 -111.1400       5.9       161       132        75
WVCT   2025250     91400   22.5800 -113.4800       8.2       128       238        87
WVCT   2025250     91400   22.6000 -113.5500       8.8       125       242        95
WVCT   2025250     91400   22.5600 -113.9100       7.0       136       233        91
WVCT   2025250     91400   22.5900 -114.3500       4.9       142       239        70
WVCT   2025250     91400   22.5400 -114.5000       6.9       154       238        86
WVCT   2025250     91400   22.5800 -114.6500       9.9       151       230        97
WVCT   2025250     91400   22.5800 -114.7700       9.6       149       221        95
WVCT   2025250     91400   22.5500 -114.8000       9.4       150       219        86
WVCT   2025250     91400   22.5700 -114.9100      12.2       158       200        92
WVCT   2025250     91400   22.5800 -115.1200      13.0       174       194       100
WVCT   2025250     91400   22.5200 -115.2500      13.2       174       194       100
WVCT   2025250     91400   22.6000 -115.2700      12.3       169       188       100
WVCT   2025250     91400   22.6000 -115.3700      12.1       165       202        81
WVCT   2025250     91400   22.5900 -115.5500      10.5       158       208        83
WVCT   2025250     91400   22.5900 -115.6000      10.2       157       207        98
WVCT   2025250     91400   22.5400 -115.8100       8.0       164       206        93
WVCT   2025250     91400   22.5600 -115.8300       7.7       172       206        96
WVCT   2025250     91400   22.4900 -116.6200      12.3       150       208        70
WVCT   2025250     91400   22.4900 -116.8000       7.8       126       211        64
WVCT   2025250     91400   22.4800 -117.1000       9.7       184       221        62
WVCT   2025250     91400   22.4700 -117.3000      11.2       174       228        98
WVCT   2025250     91400   22.4700 -117.3700      10.0       168       233       100
WVCT   2025250     91400   22.4900 -117.4600      10.9       152       208        99
WVCT   2025250     91400   22.4400 -117.6400       9.0       155       218       100
WVCT   2025250     91400   22.4600 -117.6600       8.4       158       217        94
WVCT   2025250     91400   22.4800 -117.7700       9.4       162       219        79
WVCT   2025250     91400   22.7600 -108.1900       4.8        64       232        62
WVCT   2025250     91400   22.7400 -108.5500      13.6        94       180        90
WVCT   2025250     91400   22.6500 -108.7100      12.4        95       184        96
WVCT   2025250     91400   22.6500 -108.8100      12.4        95       182       100
WVCT   2025250     91400   22.7100 -108.9200      10.9        88       174        95
WVCT   2025250     91400   22.6900 -108.9700       8.0        78       180        90
WVCT   2025250     91400   22.6400 -109.1400       5.8         5       186        78
WVCT   2025250     91400   22.6300 -109.4200       8.5         1       201        85
WVCT   2025250     91400   22.7000 -109.5700       6.1       348       177        60
WVCT   2025250     91400   22.6200 -109.7000       4.5        28       176        67
WVCT   2025250     91400   22.7000 -109.7500       6.1         7       176        61
WVCT   2025250     91400   22.6100 -109.9200       6.3       326       177        98
WVCT   2025250     91400   22.6000 -110.0200       4.6       330       176        68
WVCT   2025250     91400   22.5900 -110.2700       5.0        99       171        70
WVCT   2025250     91400   22.6700 -110.4000       7.8        93       170        99
WVCT   2025250     91400   22.5800 -110.7000       6.8       123       143        60
WVCT   2025250     91400   22.6400 -111.1200       5.8       175       133        67
WVCT   2025250     91400   22.5800 -111.6200       4.8        51       159        64
WVCT   2025250     91400   22.5400 -111.7800       4.0       104       166        95
WVCT   2025250     91400   22.5900 -111.8800       4.9       100       169        91
WVCT   2025250     91400   22.6000 -112.1700       4.6       200       177        77
WVCT   2025250     91400   22.5400 -112.2800       4.6       226       176        79
WVCT   2025250     91400   22.4800 -113.3400       5.8       142       244        68
WVCT   2025250     91400   22.4900 -113.5100       8.3       121       230        95
WVCT   2025250     91400   22.4900 -113.6200       9.2       107       220        93
WVCT   2025250     91400   22.4800 -113.8400       6.4       130       211        96
WVCT   2025250     91400   22.5400 -113.9200       6.6       137       234        79
WVCT   2025250     91400   22.4400 -114.4500       5.5       166       250        89
WVCT   2025250     91400   22.5200 -114.4800       6.3       158       238        88
WVCT   2025250     91400   22.5200 -114.6700       7.2       146       233        91
WVCT   2025250     91400   22.4700 -114.7300       6.5       151       232        76
WVCT   2025250     91400   22.4500 -114.8900       9.1       152       218        84
WVCT   2025250     91400   22.4200 -115.0400      10.4       164       210        95
WVCT   2025250     91400   22.4200 -115.0600      10.9       164       209        99
WVCT   2025250     91400   22.5000 -115.2300      13.4       174       201       100
WVCT   2025250     91400   22.4900 -115.3400      13.0       170       211        82
WVCT   2025250     91400   22.4700 -115.4000      12.7       168       208        66
WVCT   2025250     91400   22.4800 -115.7800       8.3       169       205        85
WVCT   2025250     91400   22.4300 -115.8800       7.9       157       206        93
WVCT   2025250     91400   22.4100 -116.0700      12.4       172       198        97
WVCT   2025250     91400   22.3900 -116.1000      13.4       173       198        89
WVCT   2025250     91400   22.3900 -116.7800      10.9       133       211        97
WVCT   2025250     91400   22.3600 -116.8100      10.6       136       211        82
WVCT   2025250     91400   22.4000 -116.9100      10.7       133       211        67
WVCT   2025250     91400   22.3700 -117.2800       9.6       165       226       100
WVCT   2025250     91400   22.3700 -117.3000      10.0       165       231        98
WVCT   2025250     91400   22.3500 -117.4200       9.1       164       240        97
WVCT   2025250     91400   22.4000 -117.6100       9.7       154       221        95
WVCT   2025250     91400   22.4200 -117.6300       9.5       154       219        96
WVCT   2025250     91400   22.3300 -117.8000       9.9       148       238        66
WVCT   2025250     91400   22.5800 -108.4000       5.1        56       182        83
WVCT   2025250     91400   22.5600 -108.4800       6.9        66       182        61
WVCT   2025250     91400   22.6400 -108.6400      11.9        93       183        84
WVCT   2025250     91400   22.6100 -108.7700      10.5        90       184        95
WVCT   2025250     91400   22.6100 -108.8500       9.8        87       183        99
WVCT   2025250     91400   22.5800 -108.9300       6.8        78       183        98
WVCT   2025250     91400   22.5900 -109.3600       8.4        13       201        60
WVCT   2025250     91400   22.6000 -109.4300       7.6         4       184        81
WVCT   2025250     91400   22.5500 -109.7700       5.9        19       176        94
WVCT   2025250     91400   22.5900 -109.9000       6.0       338       178        95
WVCT   2025250     91400   22.5400 -109.9900       7.2       329       178        74
WVCT   2025250     91400   22.5500 -110.2900       4.2        91       171        60
WVCT   2025250     91400   22.5700 -110.4100       5.6        96       169       100
WVCT   2025250     91400   22.4800 -110.5500       6.5        97       169        74
WVCT   2025250     91400   22.5000 -110.6000       7.8       107       168        67
WVCT   2025250     91400   22.4600 -111.0700       4.9       259       148        96
WVCT   2025250     91400   22.4700 -111.7700       4.0        97       166        65
WVCT   2025250     91400   22.4900 -111.7900       4.3       105       167        85
WVCT   2025250     91400   22.4200 -112.0300       4.5       107       181        63
WVCT   2025250     91400   22.4800 -112.2500       5.6       234       179        76
WVCT   2025250     91400   22.4200 -112.7000       4.2       309       194        82
WVCT   2025250     91400   22.4200 -113.3400       6.7       119       240        97
WVCT   2025250     91400   22.3900 -113.3900       6.8       119       240       100
WVCT   2025250     91400   22.3900 -113.5800       8.6       112       231        96
WVCT   2025250     91400   22.3800 -113.6700       7.1       108       226        87
WVCT   2025250     91400   22.4400 -113.7300       7.0       109       226        89
WVCT   2025250     91400   22.4400 -113.8200       5.0       128       233        79
WVCT   2025250     91400   22.4200 -114.4800       6.0       168       255        91
WVCT   2025250     91400   22.3300 -114.5500       7.2       168       253        99
WVCT   2025250     91400   22.3700 -114.7500       9.9       164       233        91
WVCT   2025250     91400   22.4100 -114.8600       8.8       166       225        94
WVCT   2025250     91400   22.4000 -114.9000       8.7       166       220        98
WVCT   2025250     91400   22.4000 -115.0400      10.3       167       210        95
WVCT   2025250     91400   22.3300 -115.2200      12.9       168       207       100
WVCT   2025250     91400   22.3500 -115.2400      13.2       167       207       100
WVCT   2025250     91400   22.3300 -115.4100      12.6       167       208        90
WVCT   2025250     91400   22.2900 -115.9200      11.0       170       204        95
WVCT   2025250     91400   22.2900 -115.9400      11.9       171       202        87
WVCT   2025250     91400   22.3000 -116.0700      12.4       169       198        86
WVCT   2025250     91400   22.3600 -116.2200      11.7       157       200        66
WVCT   2025250     91400   22.3400 -116.8300      10.7       140       211        79
WVCT   2025250     91400   22.2600 -116.9200       8.8       156       211        99
WVCT   2025250     91400   22.3300 -117.2200       8.3       161       220        99
WVCT   2025250     91400   22.3100 -117.3100       9.5       163       226        87
WVCT   2025250     91400   22.2400 -117.4400       8.4       177       231        99
WVCT   2025250     91400   22.2400 -117.5800       8.5       183       231        96
WVCT   2025250     91400   22.2600 -117.5900       7.8       167       231        81
WVCT   2025250     91400   22.3200 -117.6900       8.1       156       230        89
WVCT   2025250     91400   22.3000 -118.3000       4.4       157       194        64
WVCT   2025250     91400   22.2500 -118.4200       5.5       127       187        60
WVCT   2025250     91400   22.2100 -118.6000       6.5       104       182        70
WVCT   2025250     91400   22.2900 -118.6500      12.5        99       189        64
WVCT   2025250     91400   22.4800 -108.8100       4.0        27       183        88
WVCT   2025250     91400   22.4400 -108.8500       4.3       342       182        81
WVCT   2025250     91400   22.4900 -109.8100       6.6         9       176        98
WVCT   2025250     91400   22.4800 -109.8600       7.2         3       176        96
WVCT   2025250     91400   22.4500 -110.0700       5.9       332       176        90
WVCT   2025250     91400   22.4300 -110.1000       5.5       330       176        99
WVCT   2025250     91400   22.3800 -110.4600       8.5        39       170        91
WVCT   2025250     91400   22.4000 -110.4800       8.2        37       170        97
WVCT   2025250     91400   22.4600 -110.5800       5.9        95       169        62
WVCT   2025250     91400   22.3600 -110.8100       8.6        13       108        93
WVCT   2025250     91400   22.3600 -110.8600       7.6        17       108        86
WVCT   2025250     91400   22.3500 -111.0800       4.4       323       165        95
WVCT   2025250     91400   22.3700 -111.1000       4.2       305       162        92
WVCT   2025250     91400   22.3400 -111.3200      12.5       240       162        64
WVCT   2025250     91400   22.3600 -111.3400      14.7       241       160        75
WVCT   2025250     91400   22.2800 -113.1400       7.0        99       196        97
WVCT   2025250     91400   22.2800 -113.1600       7.3        99       198        93
WVCT   2025250     91400   22.3600 -113.3100       6.6       106       231        95
WVCT   2025250     91400   22.3500 -113.3800       5.9       110       236        99
WVCT   2025250     91400   22.3500 -113.5200       6.2       116       231        87
WVCT   2025250     91400   22.3400 -113.6400       7.0       110       233        82
WVCT   2025250     91400   22.2600 -114.3600       5.9       166       222        87
WVCT   2025250     91400   22.3000 -114.3700       4.7       165       230        97
WVCT   2025250     91400   22.3100 -114.5300       6.3       175       251        99
WVCT   2025250     91400   22.2300 -114.6400       7.0       166       244       100
WVCT   2025250     91400   22.2200 -114.7600       8.8       162       220        99
WVCT   2025250     91400   22.2200 -114.8500       9.5       171       216        81
WVCT   2025250     91400   22.2800 -115.0300      10.9       175       210        98
WVCT   2025250     91400   22.2300 -115.1700      11.7       174       208       100
WVCT   2025250     91400   22.2300 -115.2200      11.4       173       207        99
WVCT   2025250     91400   22.2900 -115.3900      12.0       168       205        93
WVCT   2025250     91400   22.2200 -115.4800      10.8       160       205        89
WVCT   2025250     91400   22.2700 -115.9000      10.4       174       204        97
WVCT   2025250     91400   22.2500 -115.9500      11.4       177       200        90
WVCT   2025250     91400   22.2600 -116.0600      11.8       170       198        86
WVCT   2025250     91400   22.1800 -116.2100      11.6       165       199        97
WVCT   2025250     91400   22.1900 -116.2800      13.2       155       200        98
WVCT   2025250     91400   22.2400 -116.7400       8.1       189       208        94
WVCT   2025250     91400   22.2400 -116.9000       8.4       165       211       100
WVCT   2025250     91400   22.2000 -117.4500       7.3       182       228        60
WVCT   2025250     91400   22.2200 -117.5800       8.8       187       231        91
WVCT   2025250     91400   22.1500 -117.7900       8.5       180       224        62
WVCT   2025250     91400   22.1500 -118.4800       4.6       156       183        89
WVCT   2025250     91400   22.1000 -118.6000       4.4       149       182        62
WVCT   2025250     91400   22.3600 -108.1600       8.1        69       180        64
WVCT   2025250     91400   22.3200 -109.6600       4.1        16       175        63
WVCT   2025250     91400   22.3800 -109.7700       5.7         5       173        93
WVCT   2025250     91400   22.3400 -109.9000       5.0       350       174        91
WVCT   2025250     91400   22.3000 -110.3600       5.0        51       169        66
WVCT   2025250     91400   22.3500 -110.4900       9.7        29       170        94
WVCT   2025250     91400   22.3300 -110.6200      13.2        12       168        77
WVCT   2025250     91400   22.2700 -110.6600      12.1         5       181        87
WVCT   2025250     91400   22.3400 -110.8400       8.2        13       109        93
WVCT   2025250     91400   22.2700 -111.0000      10.5         1       142        94
WVCT   2025250     91400   22.2900 -111.0500       7.7       346       168        91
WVCT   2025250     91400   22.2500 -111.1600       5.3       310       171        69
WVCT   2025250     91400   22.2300 -111.6000       4.1       113       170        85
WVCT   2025250     91400   22.2600 -113.1400       7.4        99       197        97
WVCT   2025250     91400   22.2200 -113.5500       4.6       124       236        64
WVCT   2025250     91400   22.1400 -114.1100       7.9       184       206        61
WVCT   2025250     91400   22.1400 -114.1500       8.3       181       206        68
WVCT   2025250     91400   22.2100 -114.6700       7.0       169       240        93
WVCT   2025250     91400   22.1400 -114.7300       6.9       171       210        79
WVCT   2025250     91400   22.1400 -114.8700       8.0       168       208        72
WVCT   2025250     91400   22.1700 -115.0500      11.5       171       207       100
WVCT   2025250     91400   22.1700 -115.1400      12.0       173       208        99
WVCT   2025250     91400   22.1900 -115.2100      11.6       175       208        96
WVCT   2025250     91400   22.1600 -115.4000       9.0       162       204        62
WVCT   2025250     91400   22.1800 -115.4800       9.7       157       205        88
WVCT   2025250     91400   22.1300 -115.7700      12.6       178       204        96
WVCT   2025250     91400   22.1700 -115.9000      11.6       179       202        95
WVCT   2025250     91400   22.1000 -116.0300      12.0       178       198       100
WVCT   2025250     91400   22.1400 -116.1300      12.2       170       199        99
WVCT   2025250     91400   22.1500 -116.2400      11.9       163       199        93
WVCT   2025250     91400   22.1300 -116.2700      12.6       161       200        84
WVCT   2025250     91400   22.0600 -116.4900      13.3       162       209        98
WVCT   2025250     91400   22.1000 -116.5900       8.2       152       208        77
WVCT   2025250     91400   22.0500 -116.8500       9.5       172       207       100
WVCT   2025250     91400   22.0500 -117.5500       9.4       127       220        82
WVCT   2025250     91400   22.1100 -117.6200      14.7       101       225        65
WVCT   2025250     91400   22.0200 -118.0400       9.1       193       218        79
WVCT   2025250     91400   22.0400 -118.5900       4.3       177       189        61
WVCT   2025250     91400   22.2900 -107.8800      13.1        76       170        86
WVCT   2025250     91400   22.3100 -108.3500       4.1        68       200        62
WVCT   2025250     91400   22.2400 -108.5500       4.3        57       226        75
WVCT   2025250     91400   22.2800 -108.6900       5.1       307       180        93
WVCT   2025250     91400   22.1900 -109.8700       4.8       305       159        93
WVCT   2025250     91400   22.1800 -110.2200       4.3        61       170        90
WVCT   2025250     91400   22.1900 -110.3600       4.2        61       169        72
WVCT   2025250     91400   22.1900 -110.3900       4.2        58       169        72
WVCT   2025250     91400   22.2400 -110.6700      11.2         5       189        91
WVCT   2025250     91400   22.1600 -110.7900       9.6       350       168        95
WVCT   2025250     91400   22.1700 -110.9800       9.7       349       173       100
WVCT   2025250     91400   22.1900 -111.0000       9.4       351       175       100
WVCT   2025250     91400   22.2300 -111.1100       6.1       326       171        76
WVCT   2025250     91400   22.0900 -112.5700       4.3       125       208        99
WVCT   2025250     91400   22.0700 -113.0500       8.2        86       205        97
WVCT   2025250     91400   22.1600 -113.1000       8.5        91       197        99
WVCT   2025250     91400   22.0600 -114.0100       7.5       195       209        68
WVCT   2025250     91400   22.0400 -114.1600       8.9       188       205        99
WVCT   2025250     91400   22.0400 -114.1800       9.1       186       206        99
WVCT   2025250     91400   22.0300 -114.3000      10.5       179       203        77
WVCT   2025250     91400   22.1000 -114.8400       7.6       169       208        95
WVCT   2025250     91400   22.0700 -114.9100       7.8       166       206        91
WVCT   2025250     91400   22.0300 -115.0800       9.3       165       204       100
WVCT   2025250     91400   22.0200 -115.1500      10.0       164       202        95
WVCT   2025250     91400   22.0800 -115.2100      11.2       170       206        94
WVCT   2025250     91400   22.0600 -115.3300       9.7       165       205        89
WVCT   2025250     91400   22.0300 -115.7000      13.4       180       205       100
WVCT   2025250     91400   22.0200 -115.8200      13.8       184       204        97
WVCT   2025250     91400   21.9800 -115.9400      13.9       180       203        98
WVCT   2025250     91400   21.9700 -116.0500      14.6       173       203        99
WVCT   2025250     91400   21.9700 -116.1000      14.7       172       204        99
WVCT   2025250     91400   21.9900 -116.1900      14.4       171       208        99
WVCT   2025250     91400   21.9600 -116.4000      13.1       165       213       100
WVCT   2025250     91400   22.0000 -116.4600      13.5       165       211        99
WVCT   2025250     91400   21.9600 -116.5300      11.1       163       209        80
WVCT   2025250     91400   21.9500 -116.7100       6.1       156       204        64
WVCT   2025250     91400   21.9900 -116.9800      11.5       174       208       100
WVCT   2025250     91400   21.9600 -117.1200       8.2       174       213        84
WVCT   2025250     91400   21.9400 -117.1400       7.4       178       213        88
WVCT   2025250     91400   21.9600 -117.2500       5.8       166       216        72
WVCT   2025250     91400   21.9700 -117.3800       6.7       151       218        68
WVCT   2025250     91400   21.9700 -117.5600       8.0       139       223        94
WVCT   2025250     91400   21.9900 -117.5800       7.7       136       221        95
WVCT   2025250     91400   21.9200 -117.7100       5.1       122       223        95
WVCT   2025250     91400   22.0000 -118.0700       7.7       189       217        69
WVCT   2025250     91400   22.1700 -107.7900      10.8        82       174        99
WVCT   2025250     91400   22.2500 -107.8400      13.6        74       167        87
WVCT   2025250     91400   22.1800 -108.0100      12.2        83       183       100
WVCT   2025250     91400   22.2000 -108.1400      12.9        81       191        99
WVCT   2025250     91400   22.2300 -108.3000       9.8        77       203        76
WVCT   2025250     91400   22.1400 -108.4600      11.7        82       208        85
WVCT   2025250     91400   22.1600 -108.5300       9.6        74       203        84
WVCT   2025250     91400   22.1200 -108.9700       7.6       285       161        90
WVCT   2025250     91400   22.1400 -109.0900       4.5       288       161        98
WVCT   2025250     91400   22.1700 -109.8000       4.4       326       148        85
WVCT   2025250     91400   22.1600 -110.2300       5.0        66       168        86
WVCT   2025250     91400   22.1400 -110.6500       4.7       352       179        66
WVCT   2025250     91400   22.1300 -110.8200       9.2       350       168        97
WVCT   2025250     91400   22.1300 -110.8700       9.5       350       168        93
WVCT   2025250     91400   22.1300 -110.9700       9.1       345       175        99
WVCT   2025250     91400   22.1100 -111.6100       7.3       111       194        85
WVCT   2025250     91400   22.0200 -111.7700       5.2       115       214        70
WVCT   2025250     91400   21.9700 -113.0000       6.2        87       217        97
WVCT   2025250     91400   22.0500 -113.1000       7.2        85       205        97
WVCT   2025250     91400   21.9500 -113.6200       7.9       175       191        80
WVCT   2025250     91400   21.9900 -113.7200       8.0       191       193        74
WVCT   2025250     91400   21.9400 -113.8500      11.2       199       204        81
WVCT   2025250     91400   21.9600 -113.8700      10.6       200       205        76
WVCT   2025250     91400   21.9400 -113.9900       9.5       194       198        86
WVCT   2025250     91400   21.9300 -114.1800       8.6       198       206        88
WVCT   2025250     91400   21.9300 -114.2300       9.1       198       208        98
WVCT   2025250     91400   21.9200 -114.4100       9.2       190       208        69
WVCT   2025250     91400   21.9500 -115.0100       8.0       156       208        99
WVCT   2025250     91400   21.9200 -115.0800       8.3       157       199        96
WVCT   2025250     91400   21.9800 -115.1900       9.8       160       200        85
WVCT   2025250     91400   21.9600 -115.3500      10.7       166       201        95
WVCT   2025250     91400   21.9100 -115.4800      12.2       172       202        96
WVCT   2025250     91400   21.9300 -115.4900      12.2       173       202        96
WVCT   2025250     91400   21.8800 -115.6600      12.8       179       206        88
WVCT   2025250     91400   21.9000 -115.7700      12.4       185       205        94
WVCT   2025250     91400   21.9400 -115.8300      13.0       182       205        98
WVCT   2025250     91400   21.9500 -116.0400      14.2       173       203        99
WVCT   2025250     91400   21.9500 -116.0600      14.4       172       204        99
WVCT   2025250     91400   21.9500 -116.2600      13.2       168       213       100
WVCT   2025250     91400   21.9400 -116.3800      12.8       164       214        99
WVCT   2025250     91400   21.9000 -116.4600      12.6       159       213        85
WVCT   2025250     91400   21.9400 -116.5100      12.0       163       210        88
WVCT   2025250     91400   21.9300 -116.7000       6.4       156       205        65
WVCT   2025250     91400   21.8500 -116.8000       8.8       159       202        99
WVCT   2025250     91400   21.8400 -116.9600      10.2       161       205        93
WVCT   2025250     91400   21.8400 -116.9800      10.4       164       208        95
WVCT   2025250     91400   21.9200 -117.1700       6.9       182       214        93
WVCT   2025250     91400   21.8600 -117.2500       7.3       183       210        83
WVCT   2025250     91400   21.8900 -117.3100       6.3       172       213        91
WVCT   2025250     91400   21.8500 -117.4800       8.6       157       218        96
WVCT   2025250     91400   21.9100 -117.5300       8.5       151       220        91
WVCT   2025250     91400   21.9000 -117.6900       4.7       123       226        76
WVCT   2025250     91400   22.0800 -107.8700      12.2        88       184        98
WVCT   2025250     91400   22.1000 -107.9400      11.9        88       186       100
WVCT   2025250     91400   22.1000 -108.0700      11.5        88       192        99
WVCT   2025250     91400   22.0700 -108.1500      10.8        87       199        98
WVCT   2025250     91400   22.0400 -108.4400      10.3        86       198        98
WVCT   2025250     91400   22.0800 -108.5500       7.5        70       174        93
WVCT   2025250     91400   22.1000 -108.9500       7.9       284       159        80
WVCT   2025250     91400   22.0600 -109.0600       4.6       288       153        84
WVCT   2025250     91400   21.9900 -109.7800       8.6       102       124        66
WVCT   2025250     91400   22.0400 -110.0400      13.0        94       137        68
WVCT   2025250     91400   22.0500 -110.1800       8.5        85       149        76
WVCT   2025250     91400   22.0500 -110.2800       6.5        78       156        77
WVCT   2025250     91400   22.0500 -110.4300       4.3        57       163        79
WVCT   2025250     91400   22.0300 -110.7500       5.5       315       174        71
WVCT   2025250     91400   22.0300 -110.7800       6.5       310       173        86
WVCT   2025250     91400   21.9800 -110.9600       4.7       328       176        82
WVCT   2025250     91400   21.9800 -111.7400       4.3       107       211        96
WVCT   2025250     91400   22.0000 -111.7600       5.0       110       213        88
WVCT   2025250     91400   21.9500 -112.9300       4.9        86       216        98
WVCT   2025250     91400   21.9100 -112.9900       5.1        92       218        91
WVCT   2025250     91400   21.8500 -113.5200      10.4       170       207        99
WVCT   2025250     91400   21.8500 -113.6700      10.9       192       207        88
WVCT   2025250     91400   21.8800 -113.7700      12.0       196       206        99
WVCT   2025250     91400   21.8400 -113.9000      13.1       192       204        95
WVCT   2025250     91400   21.8300 -114.0200      10.5       178       198       100
WVCT   2025250     91400   21.8300 -114.0400       9.9       179       198        99
WVCT   2025250     91400   21.9100 -114.2300       9.1       199       208        98
WVCT   2025250     91400   21.9100 -114.2600       9.5       201       208        94
WVCT   2025250     91400   21.8400 -114.4100       8.5       196       208        72
WVCT   2025250     91400   21.8400 -114.5300       7.3       177       209        66
WVCT   2025250     91400   21.8100 -114.7200       7.1       161       208        62
WVCT   2025250     91400   21.8100 -114.7600       7.1       160       207        68
WVCT   2025250     91400   21.8300 -114.9000       7.4       152       207       100
WVCT   2025250     91400   21.8800 -115.0200       7.8       153       208       100
WVCT   2025250     91400   21.8800 -115.1200       8.5       151       197        87
WVCT   2025250     91400   21.8300 -115.2900      10.9       136       199        74
WVCT   2025250     91400   21.8500 -115.3800      11.1       154       199       100
WVCT   2025250     91400   21.8700 -115.4900      12.7       172       201        93
WVCT   2025250     91400   21.8000 -115.6400      13.1       175       209        91
WVCT   2025250     91400   21.8400 -115.7400      12.0       182       205        98
WVCT   2025250     91400   21.8600 -115.7600      12.0       184       205        97
WVCT   2025250     91400   21.8400 -115.9000      12.6       170       204       100
WVCT   2025250     91400   21.8500 -115.9900      13.5       164       208       100
WVCT   2025250     91400   21.8300 -116.2000      13.0       167       217        99
WVCT   2025250     91400   21.8300 -116.2200      12.6       167       219        98
WVCT   2025250     91400   21.8000 -116.3600       9.2       153       222        99
WVCT   2025250     91400   21.8400 -116.4900      10.7       153       208        77
WVCT   2025250     91400   21.7700 -116.5900       9.7       148       208        88
WVCT   2025250     91400   21.7900 -116.7700       9.3       158       208        84
WVCT   2025250     91400   21.7600 -116.8900       9.7       153       208        99
WVCT   2025250     91400   21.8000 -116.9900      10.0       160       210       100
WVCT   2025250     91400   21.8200 -117.0100      10.2       164       209        99
WVCT   2025250     91400   21.7500 -117.2000       9.6       178       213        82
WVCT   2025250     91400   21.7300 -117.2800       9.0       176       207        99
WVCT   2025250     91400   21.8100 -117.4400       8.9       159       215        85
WVCT   2025250     91400   21.8100 -117.4800       8.8       157       219        97
WVCT   2025250     91400   21.7400 -117.6800       7.1       136       228        99
WVCT   2025250     91400   21.7600 -117.6900       6.4       132       229        89
WVCT   2025250     91400   21.7400 -117.8300       5.7       137       211        81
WVCT   2025250     91400   21.7400 -118.4700      10.4        92       199        63
WVCT   2025250     91400   22.0400 -107.8500      12.8        89       184        98
WVCT   2025250     91400   22.0400 -107.9800      11.6        92       190       100
WVCT   2025250     91400   21.9900 -108.1500       9.2        96       204        97
WVCT   2025250     91400   21.9800 -108.3800       8.7        89       176        70
WVCT   2025250     91400   22.0000 -108.8500      12.2       280       148        67
WVCT   2025250     91400   22.0000 -108.9300      11.4       280       147        71
WVCT   2025250     91400   21.8800 -109.8100       4.7       110       128        61
WVCT   2025250     91400   21.8800 -109.8400       5.4       107       129        62
WVCT   2025250     91400   21.8800 -110.3800       6.3        84       155        88
WVCT   2025250     91400   21.8800 -111.6200       6.4       248       215        91
WVCT   2025250     91400   21.8100 -111.7800       4.7       277       209        79
WVCT   2025250     91400   21.8100 -111.8500       4.3       289       209        79
WVCT   2025250     91400   21.8000 -113.2800       7.2       203       207        95
WVCT   2025250     91400   21.7700 -113.3600      10.7       200       208        98
WVCT   2025250     91400   21.8100 -113.5600      11.0       174       209        99
WVCT   2025250     91400   21.7900 -113.5900      11.1       177       209        99
WVCT   2025250     91400   21.7400 -113.7100      11.6       193       213        99
WVCT   2025250     91400   21.7600 -113.9200      13.1       188       200        93
WVCT   2025250     91400   21.7900 -114.0000      11.1       178       198       100
WVCT   2025250     91400   21.7700 -114.0600       9.6       177       198        98
WVCT   2025250     91400   21.8100 -114.2300       6.8       199       204        99
WVCT   2025250     91400   21.7200 -114.3700       5.8       203       205        86
WVCT   2025250     91400   21.7800 -114.4700       7.1       186       207        94
WVCT   2025250     91400   21.7100 -114.6300       6.3       160       205        98
WVCT   2025250     91400   21.7100 -114.6500       6.4       157       203        99
WVCT   2025250     91400   21.7100 -114.7700       6.8       153       201        95
WVCT   2025250     91400   21.7000 -114.9000       7.4       159       200        84
WVCT   2025250     91400   21.7200 -115.0800      11.2       145       198        90
WVCT   2025250     91400   21.7000 -115.1100      11.4       145       204        88
WVCT   2025250     91400   21.6900 -115.2500      11.6       136       210        73
WVCT   2025250     91400   21.7100 -115.4100      12.2       153       213        84
WVCT   2025250     91400   21.6800 -115.5500      14.1       168       216        98
WVCT   2025250     91400   21.7000 -115.5700      14.2       169       216        98
WVCT   2025250     91400   21.7000 -115.7700      12.8       172       211       100
WVCT   2025250     91400   21.7200 -115.7900      12.7       173       210       100
WVCT   2025250     91400   21.7300 -115.9000      13.4       165       215        97
WVCT   2025250     91400   21.7100 -116.0200      14.2       158       225        95
WVCT   2025250     91400   21.7500 -116.1500      12.7       167       222        88
WVCT   2025250     91400   21.7000 -116.3200       7.8       163       227        84
WVCT   2025250     91400   21.7200 -116.4500       7.7       133       216        92
WVCT   2025250     91400   21.6700 -116.4800       7.0       126       216        70
WVCT   2025250     91400   21.6500 -116.6400       8.8       145       211        72
WVCT   2025250     91400   21.6500 -116.7100       9.5       156       214        86
WVCT   2025250     91400   21.6800 -116.8600       9.6       158       221        97
WVCT   2025250     91400   21.6800 -116.9300       9.6       156       216        99
WVCT   2025250     91400   21.7200 -117.1000      10.5       165       240       100
WVCT   2025250     91400   21.7100 -117.2400       9.5       174       215        98
WVCT   2025250     91400   21.6700 -117.3600       8.4       170       207        97
WVCT   2025250     91400   21.6200 -117.4100       7.5       166       207        77
WVCT   2025250     91400   21.6800 -117.5800       8.3       155       223        99
WVCT   2025250     91400   21.6600 -117.6000       7.9       155       223        97
WVCT   2025250     91400   21.6100 -117.8100       4.8       145       202        92
WVCT   2025250     91400   21.8800 -107.7500      12.8        90       174        76
WVCT   2025250     91400   21.8900 -108.0000      12.5        94       198        89
WVCT   2025250     91400   21.8200 -109.8000       4.0        87       125        70
WVCT   2025250     91400   21.8300 -110.0000      11.4        83       135        75
WVCT   2025250     91400   21.8000 -110.4500       5.0       129       164        77
WVCT   2025250     91400   21.7200 -113.1600       4.0       177       209        82
WVCT   2025250     91400   21.6700 -113.3300      12.5       195       206        96
WVCT   2025250     91400   21.6900 -113.3800      13.1       196       209        98
WVCT   2025250     91400   21.7300 -113.5300      12.6       183       213       100
WVCT   2025250     91400   21.7200 -113.7000      11.7       192       213        98
WVCT   2025250     91400   21.6400 -113.8100      12.3       199       208       100
WVCT   2025250     91400   21.7100 -113.9300      12.2       189       199        95
WVCT   2025250     91400   21.6300 -114.0000       9.1       191       197        94
WVCT   2025250     91400   21.6300 -114.1100       7.5       185       200        93
WVCT   2025250     91400   21.6800 -114.2900       6.1       191       203        98
WVCT   2025250     91400   21.6800 -114.3600       4.5       197       204        99
WVCT   2025250     91400   21.7000 -114.4900       5.6       188       206        85
WVCT   2025250     91400   21.6900 -114.6100       6.0       167       205        83
WVCT   2025250     91400   21.6700 -114.6600       6.1       164       202        97
WVCT   2025250     91400   21.6600 -114.8400       7.5       159       200        86
WVCT   2025250     91400   21.6400 -114.9900       8.8       157       200        81
WVCT   2025250     91400   21.6400 -115.0100       9.1       155       200        88
WVCT   2025250     91400   21.5900 -115.1400       8.8       157       204        75
WVCT   2025250     91400   21.6300 -115.2400      10.8       145       209        72
WVCT   2025250     91400   21.6400 -115.4200      11.8       160       214        74
WVCT   2025250     91400   21.6600 -115.5500      14.0       168       216        98
WVCT   2025250     91400   21.5800 -115.6400      13.6       169       211       100
WVCT   2025250     91400   21.6600 -115.6900      13.5       170       214       100
WVCT   2025250     91400   21.6500 -115.8100      13.5       166       213       100
WVCT   2025250     91400   21.6500 -115.9200      14.2       160       224       100
WVCT   2025250     91400   21.6400 -116.0800      12.8       162       225        92
WVCT   2025250     91400   21.5800 -116.2100       9.1       180       228        81
WVCT   2025250     91400   21.6000 -116.2900       8.6       185       225        83
WVCT   2025250     91400   21.5900 -116.4800       6.1       129       215        60
WVCT   2025250     91400   21.6100 -116.5800       8.5       136       213        63
WVCT   2025250     91400   21.5600 -116.7100       8.2       158       215       100
WVCT   2025250     91400   21.5400 -116.8000       9.4       161       247        97
WVCT   2025250     91400   21.6000 -116.9200      10.0       159       225        91
WVCT   2025250     91400   21.5800 -116.9500      10.3       158       224        90
WVCT   2025250     91400   21.5300 -117.0900      11.4       158       210       100
WVCT   2025250     91400   21.6100 -117.1700      11.5       160       241        99
WVCT   2025250     91400   21.5200 -117.3200       9.1       157       208        77
WVCT   2025250     91400   21.5400 -117.4900       8.6       166       206        99
WVCT   2025250     91400   21.5600 -117.5600       7.4       170       207        89
WVCT   2025250     91400   21.5300 -117.6700       6.7       161       205        84
WVCT   2025250     91400   21.5900 -117.8200       4.4       146       201        93
WVCT   2025250     91400   21.7500 -107.7400      12.9        89       180        99
WVCT   2025250     91400   21.7700 -107.9100      11.7        92       194        98
WVCT   2025250     91400   21.7400 -108.1000       7.2        86       170        99
WVCT   2025250     91400   21.7800 -108.1600       7.5        89       163        90
WVCT   2025250     91400   21.8000 -108.2600       7.0        93       154        74
WVCT   2025250     91400   21.7400 -110.2000      14.7        82       148        76
WVCT   2025250     91400   21.6700 -110.3600       8.9        73       161        61
WVCT   2025250     91400   21.6700 -110.3900       7.9        78       162        62
WVCT   2025250     91400   21.6700 -110.5400       5.7        69       172        67
WVCT   2025250     91400   21.6600 -110.7600       5.5        18       186        63
WVCT   2025250     91400   21.6300 -112.8000       4.0       149       190        90
WVCT   2025250     91400   21.6400 -113.1500       4.6       171       207        83
WVCT   2025250     91400   21.5900 -113.3300      12.8       184       203        99
WVCT   2025250     91400   21.5500 -113.4100      13.8       176       210        98
WVCT   2025250     91400   21.6000 -113.6100      12.4       189       213        99
WVCT   2025250     91400   21.5600 -113.6600      12.8       191       213        96
WVCT   2025250     91400   21.5300 -113.7900      11.6       196       211       100
WVCT   2025250     91400   21.5500 -113.9700       9.0       194       192        83
WVCT   2025250     91400   21.5700 -113.9900       8.7       192       195        94
WVCT   2025250     91400   21.6100 -114.1000       7.6       187       200        92
WVCT   2025250     91400   21.6000 -114.2100       5.8       184       202        98
WVCT   2025250     91400   21.5100 -114.5300       4.8       197       185        99
WVCT   2025250     91400   21.5700 -114.5700       4.9       187       186        95
WVCT   2025250     91400   21.5600 -114.7800       7.7       158       200        92
WVCT   2025250     91400   21.5400 -114.9000       7.6       155       198        90
WVCT   2025250     91400   21.5400 -114.9600       6.8       157       199        90
WVCT   2025250     91400   21.4900 -115.0400       6.1       171       200        94
WVCT   2025250     91400   21.5300 -115.2000       7.4       165       205        75
WVCT   2025250     91400   21.5200 -115.3600       7.9       165       211        90
WVCT   2025250     91400   21.5200 -115.4300       9.3       166       213        74
WVCT   2025250     91400   21.5600 -115.5800      13.1       170       213        98
WVCT   2025250     91400   21.5100 -115.7000      13.7       168       208       100
WVCT   2025250     91400   21.5300 -115.7400      14.0       163       208        92
WVCT   2025250     91400   21.4600 -115.9400      13.7       142       208       100
WVCT   2025250     91400   21.4800 -116.0000      11.6       148       216        89
WVCT   2025250     91400   21.5400 -116.1500       8.7       169       230        97
WVCT   2025250     91400   21.4500 -116.2800       8.5       173       224        98
WVCT   2025250     91400   21.4900 -116.3800       8.5       176       215        99
WVCT   2025250     91400   21.5100 -116.4200       8.3       164       213        93
WVCT   2025250     91400   21.4600 -116.6100       7.8       154       200        96
WVCT   2025250     91400   21.4600 -116.6600       8.4       157       208        99
WVCT   2025250     91400   21.4400 -116.8400      10.7       164       239        99
WVCT   2025250     91400   21.4600 -116.8600      10.9       162       241        99
WVCT   2025250     91400   21.5100 -117.0500      11.2       157       215        98
WVCT   2025250     91400   21.5100 -117.1200      11.3       158       208        99
WVCT   2025250     91400   21.4200 -117.2700       8.9       157       207        86
WVCT   2025250     91400   21.4200 -117.3200       8.0       160       208        77
WVCT   2025250     91400   21.4800 -117.5000       9.1       169       208        94
WVCT   2025250     91400   21.4300 -117.6200       9.2       171       208        91
WVCT   2025250     91400   21.4100 -117.6500       9.0       171       208        93
WVCT   2025250     91400   21.4100 -117.7800       8.8       166       203       100
WVCT   2025250     91400   21.4000 -117.9400       4.8       169       183        86
WVCT   2025250     91400   21.4100 -118.2900       4.5       299       216        61
WVCT   2025250     91400   21.4700 -118.3500       6.0       304       244        61
WVCT   2025250     91400   21.7200 -108.1300       6.3        86       163        99
WVCT   2025250     91400   21.7100 -108.3100       7.1        90       147        96
WVCT   2025250     91400   21.6700 -108.4000      11.3       106       128        62
WVCT   2025250     91400   21.6100 -109.2400      14.9        57       112        62
WVCT   2025250     91400   21.6100 -109.3400      18.4        72       114        64
WVCT   2025250     91400   21.5800 -109.6500       6.1       111       119        76
WVCT   2025250     91400   21.5700 -109.7500       5.6       125       123        87
WVCT   2025250     91400   21.5700 -109.8500       4.6       133       129        97
WVCT   2025250     91400   21.6300 -109.9600       4.9       115       134        77
WVCT   2025250     91400   21.6200 -110.1300      11.6        95       148        67
WVCT   2025250     91400   21.6000 -110.1900      13.6        96       153        72
WVCT   2025250     91400   21.5900 -110.3400       9.5        84       159        66
WVCT   2025250     91400   21.5500 -110.5000       5.1       109       173        64
WVCT   2025250     91400   21.6000 -110.7500       5.2        17       189        85
WVCT   2025250     91400   21.6200 -110.7700       5.6        15       189        75
WVCT   2025250     91400   21.4900 -113.2100       8.9       181       182        98
WVCT   2025250     91400   21.5300 -113.3000      12.7       182       205       100
WVCT   2025250     91400   21.4600 -113.4800      12.8       176       210       100
WVCT   2025250     91400   21.4400 -113.5800      13.4       181       208        99
WVCT   2025250     91400   21.5200 -113.6500      13.2       187       211        94
WVCT   2025250     91400   21.4700 -113.8500      10.8       193       206        99
WVCT   2025250     91400   21.5100 -113.9300      10.1       197       194        78
WVCT   2025250     91400   21.5000 -114.1200       6.8       181       201        93
WVCT   2025250     91400   21.4100 -114.2600       6.7       171       200        88
WVCT   2025250     91400   21.4900 -114.5400       4.9       192       185        98
WVCT   2025250     91400   21.4900 -114.5900       5.4       189       184        99
WVCT   2025250     91400   21.4200 -114.8100       9.8       175       190        79
WVCT   2025250     91400   21.4600 -114.8400       8.8       163       195        98
WVCT   2025250     91400   21.4700 -115.0000       6.4       163       199        96
WVCT   2025250     91400   21.4700 -115.1200       6.4       178       201        99
WVCT   2025250     91400   21.4000 -115.2200       7.4       175       205        95
WVCT   2025250     91400   21.3800 -115.3000       8.8       173       201        98
WVCT   2025250     91400   21.4200 -115.4500       9.5       174       207        74
WVCT   2025250     91400   21.3700 -115.6200      13.6       171       202        98
WVCT   2025250     91400   21.3900 -115.6400      13.8       170       202        99
WVCT   2025250     91400   21.4300 -115.7400      13.4       155       196        86
WVCT   2025250     91400   21.4400 -115.9400      13.7       140       208       100
WVCT   2025250     91400   21.4400 -116.0300      10.6       148       222        95
WVCT   2025250     91400   21.4400 -116.1200       8.6       157       233        95
WVCT   2025250     91400   21.4300 -116.2800       8.4       171       221        96
WVCT   2025250     91400   21.4100 -116.3100       8.7       175       215        95
WVCT   2025250     91400   21.3500 -116.4600       9.5       176       205        97
WVCT   2025250     91400   21.3600 -116.5700       9.1       175       188        99
WVCT   2025250     91400   21.3600 -116.6800       9.5       167       200        99
WVCT   2025250     91400   21.4200 -116.8300      10.6       166       238        98
WVCT   2025250     91400   21.3900 -116.9600      10.5       157       233        99
WVCT   2025250     91400   21.3700 -116.9900      10.2       155       223        88
WVCT   2025250     91400   21.3400 -117.1800       5.8       171       201        88
WVCT   2025250     91400   21.4000 -117.3000       8.0       160       207        79
WVCT   2025250     91400   21.4000 -117.3400       7.5       164       208        77
WVCT   2025250     91400   21.3100 -117.4900       5.6       186       209        83
WVCT   2025250     91400   21.3500 -117.6200       8.7       177       208        93
WVCT   2025250     91400   21.3900 -117.7000       8.5       172       208        87
WVCT   2025250     91400   21.3900 -117.8100       8.1       169       203        98
WVCT   2025250     91400   21.3200 -117.9800       5.3       166       184        97
WVCT   2025250     91400   21.3400 -118.0000       4.6       165       182        99
WVCT   2025250     91400   21.5800 -107.9400       8.6        90       188        75
WVCT   2025250     91400   21.5300 -108.1600       4.5        58       170        90
WVCT   2025250     91400   21.5500 -108.1800       4.0        50       168        96
WVCT   2025250     91400   21.5400 -108.4100       7.3        68       151        99
WVCT   2025250     91400   21.5200 -108.4400       8.2        74       150        97
WVCT   2025250     91400   21.5300 -109.1700      14.4        54       111        66
WVCT   2025250     91400   21.5500 -109.1900      14.6        58       112        66
WVCT   2025250     91400   21.4800 -109.3500      13.5        74       110        81
WVCT   2025250     91400   21.4700 -109.6800       8.1        81       116        73
WVCT   2025250     91400   21.5500 -109.7600       5.9       117       123        90
WVCT   2025250     91400   21.5500 -109.8300       5.1       129       129        85
WVCT   2025250     91400   21.5200 -110.0600       7.6       122       146        60
WVCT   2025250     91400   21.4500 -110.2000      11.7       104       155        87
WVCT   2025250     91400   21.4400 -110.4300       8.2        90       171        82
WVCT   2025250     91400   21.4600 -110.4900       5.9       105       172        91
WVCT   2025250     91400   21.3700 -113.2700      11.6       185       179        94
WVCT   2025250     91400   21.4000 -113.4200      13.0       178       184       100
WVCT   2025250     91400   21.4200 -113.5100      12.7       177       208       100
WVCT   2025250     91400   21.3800 -113.5700      12.7       181       207       100
WVCT   2025250     91400   21.3500 -113.7400      12.0       181       208       100
WVCT   2025250     91400   21.4100 -113.8400       9.9       186       208       100
WVCT   2025250     91400   21.3600 -114.0100       9.9       189       198        91
WVCT   2025250     91400   21.3200 -114.1400       6.8       161       196        82
WVCT   2025250     91400   21.3200 -114.1600       6.9       155       196        85
WVCT   2025250     91400   21.3100 -114.3500       7.5       156       195        87
WVCT   2025250     91400   21.3300 -114.4800       7.9       162       189        95
WVCT   2025250     91400   21.3200 -114.6000       9.0       168       183        96
WVCT   2025250     91400   21.3800 -114.6800       8.6       170       184        88
WVCT   2025250     91400   21.3800 -114.7500      10.3       175       189        91
WVCT   2025250     91400   21.3800 -114.8400      10.8       170       193        98
WVCT   2025250     91400   21.2900 -115.0400      11.8       162       208        99
WVCT   2025250     91400   21.2900 -115.0900      10.7       162       208        99
WVCT   2025250     91400   21.2800 -115.3000      10.7       162       205        99
WVCT   2025250     91400   21.3000 -115.3400      10.6       168       199        98
WVCT   2025250     91400   21.2900 -115.5000       9.8       161       195        83
WVCT   2025250     91400   21.3500 -115.6200      13.6       171       201        97
WVCT   2025250     91400   21.3500 -115.6700      14.1       168       196        96
WVCT   2025250     91400   21.3500 -115.7600      14.3       153       197        77
WVCT   2025250     91400   21.3200 -115.9000      15.5       131       203        62
WVCT   2025250     91400   21.2500 -116.1000       4.7       144       207        95
WVCT   2025250     91400   21.2500 -116.1400       5.2       158       207        97
WVCT   2025250     91400   21.2500 -116.2500       7.0       165       206        90
WVCT   2025250     91400   21.2500 -116.3900       8.9       174       205       100
WVCT   2025250     91400   21.2400 -116.5000       9.7       176       186        98
WVCT   2025250     91400   21.2400 -116.6600      10.4       170       189       100
WVCT   2025250     91400   21.2600 -116.6800      10.3       170       198       100
WVCT   2025250     91400   21.2300 -116.8200      11.3       172       210        96
WVCT   2025250     91400   21.2300 -116.9300      10.3       164       215        98
WVCT   2025250     91400   21.2200 -117.0900       8.2       162       210        94
WVCT   2025250     91400   21.2200 -117.1300       7.8       165       210        87
WVCT   2025250     91400   21.2800 -117.3000       7.1       176       207       100
WVCT   2025250     91400   21.2100 -117.4200       8.1       168       209        90
WVCT   2025250     91400   21.2500 -117.5300       5.5       175       210        87
WVCT   2025250     91400   21.2500 -117.6400       5.7       181       208        99
WVCT   2025250     91400   21.2300 -117.7500       5.2       189       192       100
WVCT   2025250     91400   21.2600 -117.9500       6.2       166       195        98
WVCT   2025250     91400   21.2200 -118.0200       5.2       169       184        93
WVCT   2025250     91400   21.2100 -118.8800       6.0       108       208        85
WVCT   2025250     91400   21.4500 -108.0100       9.2        86       189        93
WVCT   2025250     91400   21.5100 -108.1700       5.2        60       171        93
WVCT   2025250     91400   21.5100 -108.1900       5.0        53       170        93
WVCT   2025250     91400   21.4400 -108.3400       5.6        46       167        99
WVCT   2025250     91400   21.5000 -108.4800       8.1        75       150        96
WVCT   2025250     91400   21.4300 -108.6000       6.5        74       141        80
WVCT   2025250     91400   21.4000 -108.8300       4.7        92       121        61
WVCT   2025250     91400   21.4700 -109.2900      12.3        65       110        69
WVCT   2025250     91400   21.4600 -109.3600      13.3        75       109        83
WVCT   2025250     91400   21.3700 -109.6100       8.6        58       111        75
WVCT   2025250     91400   21.3700 -109.7300       8.8        54       115        60
WVCT   2025250     91400   21.3500 -110.3100       7.9        83       160        93
WVCT   2025250     91400   21.4300 -110.3800       9.8        78       169        86
WVCT   2025250     91400   21.3600 -110.5200       4.1        90       173        80
WVCT   2025250     91400   21.3200 -111.0700       4.6        35       220        62
WVCT   2025250     91400   21.3000 -113.2800      11.4       183       179        97
WVCT   2025250     91400   21.3200 -113.3900      12.5       181       179       100
WVCT   2025250     91400   21.2300 -113.5600      10.8       187       189        94
WVCT   2025250     91400   21.2300 -113.7000      10.3       180       195       100
WVCT   2025250     91400   21.2700 -113.7100      10.6       179       208        98
WVCT   2025250     91400   21.2200 -113.8400      10.5       176       175        99
WVCT   2025250     91400   21.2400 -113.9700      11.2       187       193       100
WVCT   2025250     91400   21.2800 -114.1000       7.8       176       196        81
WVCT   2025250     91400   21.2700 -114.1700       7.5       154       196        83
WVCT   2025250     91400   21.2000 -114.5100       8.4       148       189        90
WVCT   2025250     91400   21.2000 -114.5800       8.6       156       188        94
WVCT   2025250     91400   21.2400 -114.6600      10.4       173       193        70
WVCT   2025250     91400   21.2800 -114.7500      11.4       176       194        80
WVCT   2025250     91400   21.1900 -114.9500      13.3       147       194        72
WVCT   2025250     91400   21.2000 -115.0800      11.5       153       203        99
WVCT   2025250     91400   21.1800 -115.1100      11.2       154       205        99
WVCT   2025250     91400   21.2600 -115.3000      11.1       161       205       100
WVCT   2025250     91400   21.1900 -115.4100      11.5       157       193        77
WVCT   2025250     91400   21.2100 -115.5400      11.8       149       196        99
WVCT   2025250     91400   21.2300 -115.5600      11.4       153       196        97
WVCT   2025250     91400   21.2200 -115.7600      15.1       161       203        96
WVCT   2025250     91400   21.2000 -115.8400      14.6       161       204        99
WVCT   2025250     91400   21.1600 -115.9300      11.8       152       202        96
WVCT   2025250     91400   21.2300 -116.1000       4.1       151       206        86
WVCT   2025250     91400   21.1900 -116.1800       6.7       165       205        95
WVCT   2025250     91400   21.2300 -116.2600       7.6       162       205        86
WVCT   2025250     91400   21.2300 -116.3700       9.1       168       205       100
WVCT   2025250     91400   21.1400 -116.5700      10.1       171       186        96
WVCT   2025250     91400   21.1800 -116.6700      10.4       167       191       100
WVCT   2025250     91400   21.1900 -116.7800      11.3       167       208        97
WVCT   2025250     91400   21.1900 -116.8000      11.5       167       208        97
WVCT   2025250     91400   21.2100 -116.9100      10.7       164       209        96
WVCT   2025250     91400   21.1800 -117.1200       8.0       167       210        97
WVCT   2025250     91400   21.1400 -117.1700       8.5       167       210        78
WVCT   2025250     91400   21.1800 -117.3400       8.6       175       210        70
WVCT   2025250     91400   21.1100 -117.4400       9.0       170       210        93
WVCT   2025250     91400   21.1100 -117.4900       8.4       171       209        92
WVCT   2025250     91400   21.1500 -117.6400       5.2       174       203       100
WVCT   2025250     91400   21.1800 -117.7800       4.4       191       165        98
WVCT   2025250     91400   21.1400 -118.5200       5.9        80       203        92
WVCT   2025250     91400   21.1600 -118.6500       4.3        71       204        66
WVCT   2025250     91400   21.4200 -107.9200      10.7        97       188        99
WVCT   2025250     91400   21.4100 -108.0200       9.8        92       190        95
WVCT   2025250     91400   21.3800 -108.2100       7.8        78       189        99
WVCT   2025250     91400   21.3800 -108.3300       5.8        61       167        94
WVCT   2025250     91400   21.3800 -108.3600       5.6        57       166        87
WVCT   2025250     91400   21.3100 -108.6100       5.9        86       159        89
WVCT   2025250     91400   21.3000 -108.7100       4.6        76       153        95
WVCT   2025250     91400   21.3000 -109.9300       8.1       342       115        74
WVCT   2025250     91400   21.2800 -111.0500       6.9        50       221        64
WVCT   2025250     91400   21.1800 -113.2900      10.0       179       177        98
WVCT   2025250     91400   21.1300 -113.4400      10.8       185       175       100
WVCT   2025250     91400   21.1500 -113.5300      10.5       190       188       100
WVCT   2025250     91400   21.2100 -113.7000      10.5       178       187       100
WVCT   2025250     91400   21.2100 -113.7700      10.8       171       172        99
WVCT   2025250     91400   21.1400 -113.9500      11.2       178       178        98
WVCT   2025250     91400   21.1600 -113.9700      11.8       182       182       100
WVCT   2025250     91400   21.1700 -114.1500      10.1       181       191        95
WVCT   2025250     91400   21.1700 -114.2700       9.2       180       192        66
WVCT   2025250     91400   21.1800 -114.5200       8.3       145       189        87
WVCT   2025250     91400   21.1800 -114.5900       8.5       154       189        92
WVCT   2025250     91400   21.1700 -114.7500      11.9       178       206        75
WVCT   2025250     91400   21.0900 -114.8800      12.4       149       194        72
WVCT   2025250     91400   21.1700 -114.9300      13.2       145       196        71
WVCT   2025250     91400   21.1000 -115.0800      10.6       148       188        88
WVCT   2025250     91400   21.1600 -115.1200      11.0       153       205        98
WVCT   2025250     91400   21.1200 -115.2400      11.8       164       192        93
WVCT   2025250     91400   21.1300 -115.4200      12.3       151       192        81
WVCT   2025250     91400   21.1100 -115.4900      12.9       146       194        82
WVCT   2025250     91400   21.1100 -115.6100      12.7       152       196        93
WVCT   2025250     91400   21.0600 -115.8000      13.7       172       185        99
WVCT   2025250     91400   21.0800 -115.8200      13.7       171       186        98
WVCT   2025250     91400   21.0500 -115.9300      11.7       160       185       100
WVCT   2025250     91400   21.0700 -116.1300      10.8       157       204        98
WVCT   2025250     91400   21.0700 -116.2200      13.0       150       203       100
WVCT   2025250     91400   21.0800 -116.2900      13.9       149       203       100
WVCT   2025250     91400   21.0400 -116.3900      13.9       156       203       100
WVCT   2025250     91400   21.0600 -116.5400      11.1       178       190        96
WVCT   2025250     91400   21.0300 -116.6300      10.7       170       191       100
WVCT   2025250     91400   21.0700 -116.7400      12.1       162       195       100
WVCT   2025250     91400   21.0500 -116.9000      12.5       163       202        99
WVCT   2025250     91400   21.0600 -117.0300      10.6       159       203       100
WVCT   2025250     91400   21.0400 -117.1000       9.4       161       208       100
WVCT   2025250     91400   21.0200 -117.1700       8.0       165       210        99
WVCT   2025250     91400   21.0500 -117.3700       7.9       169       211        75
WVCT   2025250     91400   21.0500 -117.3900       7.9       169       211        79
WVCT   2025250     91400   21.0100 -117.5100       6.6       165       208        98
WVCT   2025250     91400   21.0400 -117.6800       5.7       179       195        97
WVCT   2025250     91400   21.0200 -117.7700       4.6       193       157        99
WVCT   2025250     91400   21.0600 -118.5300       5.5       108       197        88
WVCT   2025250     91400   21.0400 -118.6300       5.8       100       199        84
WVCT   2025250     91400   21.2900 -107.9300      10.8        96       183        90
WVCT   2025250     91400   21.2800 -108.2400       8.7        92       195        93
WVCT   2025250     91400   21.2700 -108.3600       8.2        86       171        92
WVCT   2025250     91400   21.2100 -108.4300       9.8        85       171        89
WVCT   2025250     91400   21.2300 -108.5600       9.4        91       163        79
WVCT   2025250     91400   21.2800 -108.7400       4.3        65       152        97
WVCT   2025250     91400   21.2600 -108.8000       4.3        57       149        99
WVCT   2025250     91400   21.2100 -108.9300       5.5        41       128        61
WVCT   2025250     91400   21.1700 -109.9400      15.4       318       111        62
WVCT   2025250     91400   21.2100 -110.1000       4.2       336       116        60
WVCT   2025250     91400   21.1200 -113.3700      11.0       181       178        98
WVCT   2025250     91400   21.1100 -113.4200      10.7       184       176       100
WVCT   2025250     91400   21.0300 -113.5800      10.6       178       190        99
WVCT   2025250     91400   21.1100 -113.6300      11.4       179       188        99
WVCT   2025250     91400   21.0400 -113.8300      11.8       170       181        97
WVCT   2025250     91400   21.0800 -113.9200      10.7       171       178        96
WVCT   2025250     91400   21.0300 -114.0400      11.5       177       190        92
WVCT   2025250     91400   21.0900 -114.1200       9.8       179       191        74
WVCT   2025250     91400   21.0400 -114.5500       8.1       131       192        82
WVCT   2025250     91400   21.0800 -114.6100       8.3       144       192       100
WVCT   2025250     91400   20.9900 -114.7900      12.8       154       198       100
WVCT   2025250     91400   20.9900 -114.8100      13.1       154       197       100
WVCT   2025250     91400   20.9800 -115.0200      13.8       158       188        90
WVCT   2025250     91400   20.9800 -115.0400      13.9       157       192        96
WVCT   2025250     91400   21.0000 -115.1500      14.9       162       200       100
WVCT   2025250     91400   20.9900 -115.3400      12.8       166       191        99
WVCT   2025250     91400   20.9700 -115.4800      12.0       159       193        93
WVCT   2025250     91400   20.9600 -115.5700      10.9       155       193        76
WVCT   2025250     91400   20.9800 -115.7000      10.3       166       191        81
WVCT   2025250     91400   21.0200 -115.7800      13.1       174       183        99
WVCT   2025250     91400   20.9700 -115.8800      11.4       161       181        99
WVCT   2025250     91400   21.0300 -115.9400      11.7       159       182        99
WVCT   2025250     91400   20.9500 -116.0900      11.2       159       177       100
WVCT   2025250     91400   20.9900 -116.1700      11.9       153       180       100
WVCT   2025250     91400   21.0000 -116.3300      13.0       151       200       100
WVCT   2025250     91400   21.0200 -116.4100      13.2       159       202        99
WVCT   2025250     91400   20.9300 -116.5400      10.3       173       198        99
WVCT   2025250     91400   20.9500 -116.6300      10.9       173       193       100
WVCT   2025250     91400   20.9300 -116.7500      14.0       164       195       100
WVCT   2025250     91400   20.9200 -116.9500      11.0       167       199       100
WVCT   2025250     91400   21.0000 -116.9500      11.2       162       203       100
WVCT   2025250     91400   20.9400 -117.1700       6.6       163       204        99
WVCT   2025250     91400   21.0000 -117.1800       7.4       165       209       100
WVCT   2025250     91400   20.9900 -117.3300       6.4       166       213       100
WVCT   2025250     91400   20.9900 -117.4900       6.1       161       209        93
WVCT   2025250     91400   20.9400 -117.6100       6.2       154       202        98
WVCT   2025250     91400   20.9600 -117.6300       6.1       161       200        97
WVCT   2025250     91400   20.9800 -117.8200       4.2       202       156       100
WVCT   2025250     91400   20.8800 -118.4800       4.9       147       191       100
WVCT   2025250     91400   20.8800 -118.5200       5.2       146       191        98
WVCT   2025250     91400   21.1200 -108.0300       8.7        94       192        94
WVCT   2025250     91400   21.1500 -108.3300      10.0        93       227        91
WVCT   2025250     91400   21.1900 -108.4700      11.0        90       188        75
WVCT   2025250     91400   21.1000 -108.6700       7.9        86       163       100
WVCT   2025250     91400   21.1500 -108.9000       5.6        70       145        68
WVCT   2025250     91400   21.1700 -108.9200       6.0        60       136        71
WVCT   2025250     91400   21.0300 -111.6900       4.1       142       169        95
WVCT   2025250     91400   20.9700 -112.8200       9.2       176       192       100
WVCT   2025250     91400   20.9500 -112.8700      10.3       183       193        95
WVCT   2025250     91400   20.9300 -113.3200      11.7       171       201        91
WVCT   2025250     91400   20.9900 -113.4300      11.0       177       198        88
WVCT   2025250     91400   20.9700 -113.5700      10.8       172       188        98
WVCT   2025250     91400   20.9200 -113.7400      11.6       167       192        99
WVCT   2025250     91400   20.9100 -113.8800      11.6       166       193        99
WVCT   2025250     91400   20.9100 -113.9300      12.5       164       193        99
WVCT   2025250     91400   20.9900 -114.0300      12.1       172       192        95
WVCT   2025250     91400   20.9900 -114.1200      12.0       174       203        82
WVCT   2025250     91400   20.9200 -114.3400       8.0       168       199        84
WVCT   2025250     91400   20.9800 -114.4000       7.5       165       196        60
WVCT   2025250     91400   20.9300 -114.5500       8.7       139       195        76
WVCT   2025250     91400   20.9300 -114.5900       9.4       148       195        90
WVCT   2025250     91400   20.9700 -114.7900      12.3       153       197        99
WVCT   2025250     91400   20.9700 -114.8200      12.6       153       190        99
WVCT   2025250     91400   20.8800 -114.9700      12.9       149       183        96
WVCT   2025250     91400   20.8800 -115.1300      15.7       149       185        95
WVCT   2025250     91400   20.8700 -115.1800      15.5       148       186        95
WVCT   2025250     91400   20.8700 -115.3400      14.6       151       187        93
WVCT   2025250     91400   20.8800 -115.4900      13.4       155       192        98
WVCT   2025250     91400   20.9500 -115.5000      12.0       156       193        89
WVCT   2025250     91400   20.9200 -115.6700      10.2       160       192        72
WVCT   2025250     91400   20.8700 -115.8100       9.9       161       181       100
WVCT   2025250     91400   20.8500 -115.9500       9.3       172       171       100
WVCT   2025250     91400   20.8700 -115.9900       9.7       168       169       100
WVCT   2025250     91400   20.9100 -116.0800      10.9       163       170        98
WVCT   2025250     91400   20.8800 -116.2800      10.7       161       179       100
WVCT   2025250     91400   20.9000 -116.3300      10.7       161       180       100
WVCT   2025250     91400   20.8600 -116.4200      11.3       167       198       100
WVCT   2025250     91400   20.9100 -116.5500      10.4       172       197        99
WVCT   2025250     91400   20.8700 -116.6900      12.8       165       194        99
WVCT   2025250     91400   20.8700 -116.7800      13.2       164       208       100
WVCT   2025250     91400   20.9000 -116.9500      10.2       167       197       100
WVCT   2025250     91400   20.8400 -117.0500       5.2       158       192        86
WVCT   2025250     91400   20.9000 -117.1800       5.6       158       198        99
WVCT   2025250     91400   20.8100 -117.3200       4.6       185       180        94
WVCT   2025250     91400   20.8900 -117.4200       5.3       164       211        93
WVCT   2025250     91400   20.8400 -117.6100       6.5       136       211        88
WVCT   2025250     91400   20.8800 -117.6400       5.4       146       203        97
WVCT   2025250     91400   20.8000 -117.7700       6.3       156       196       100
WVCT   2025250     91400   20.8600 -118.4600       4.7       148       191        99
WVCT   2025250     91400   21.0800 -108.6500       9.7        92       166        99
WVCT   2025250     91400   20.9900 -108.9000       6.3        92       149        60
WVCT   2025250     91400   20.9500 -110.4600       4.2       303       216        80
WVCT   2025250     91400   20.9000 -112.4400       6.1       152       182        90
WVCT   2025250     91400   20.9300 -112.8600       9.4       181       192        91
WVCT   2025250     91400   20.8400 -113.0900      11.8       180       181        94
WVCT   2025250     91400   20.8800 -113.2000      11.8       167       180        96
WVCT   2025250     91400   20.8900 -113.2400      11.9       166       184        95
WVCT   2025250     91400   20.9100 -113.3300      11.5       170       201        93
WVCT   2025250     91400   20.8600 -113.5500      10.8       173       181       100
WVCT   2025250     91400   20.8600 -113.5900      11.2       171       181       100
WVCT   2025250     91400   20.8600 -113.6900      11.5       172       187        99
WVCT   2025250     91400   20.8100 -113.8600      11.5       166       192        84
WVCT   2025250     91400   20.8100 -113.9800      13.8       165       192        93
WVCT   2025250     91400   20.8000 -114.1400      11.5       183       203        71
WVCT   2025250     91400   20.8000 -114.2600      11.5       198       201        68
WVCT   2025250     91400   20.8600 -114.3600       9.0       179       196       100
WVCT   2025250     91400   20.8200 -114.4100       9.4       171       193        98
WVCT   2025250     91400   20.8700 -114.5400       9.2       143       195        78
WVCT   2025250     91400   20.8700 -114.7000      10.5       164       199        97
WVCT   2025250     91400   20.8400 -114.8200       8.8       147       198       100
WVCT   2025250     91400   20.8400 -114.9400      10.6       148       195        99
WVCT   2025250     91400   20.8600 -114.9500      11.9       149       185        98
WVCT   2025250     91400   20.8500 -115.1400      15.7       149       185        99
WVCT   2025250     91400   20.8300 -115.2100      15.3       148       185        99
WVCT   2025250     91400   20.7900 -115.3100      16.0       149       185        91
WVCT   2025250     91400   20.7600 -115.4500      16.3       149       187        92
WVCT   2025250     91400   20.7800 -115.6300      13.6       161       192       100
WVCT   2025250     91400   20.8200 -115.6900      11.7       161       192       100
WVCT   2025250     91400   20.7900 -115.8100      10.1       162       181        99
WVCT   2025250     91400   20.8300 -115.9600       9.5       176       171       100
WVCT   2025250     91400   20.7400 -116.0700      13.2       180       172        99
WVCT   2025250     91400   20.7400 -116.1600      13.9       174       174        99
WVCT   2025250     91400   20.8000 -116.3000      11.6       163       180        99
WVCT   2025250     91400   20.8000 -116.3200      11.4       163       181        99
WVCT   2025250     91400   20.7900 -116.4600      10.8       166       198       100
WVCT   2025250     91400   20.7700 -116.5800      10.7       165       206       100
WVCT   2025250     91400   20.7700 -116.6900      11.6       168       208        97
WVCT   2025250     91400   20.8000 -116.8400      10.5       167       213       100
WVCT   2025250     91400   20.8000 -116.9000       8.3       170       194       100
WVCT   2025250     91400   20.7400 -117.0300       4.2       203       187        69
WVCT   2025250     91400   20.7900 -117.3100       4.0       184       180        90
WVCT   2025250     91400   20.7500 -117.3800       5.3       190       178        95
WVCT   2025250     91400   20.7600 -117.4900       6.3       164       208        95
WVCT   2025250     91400   20.7800 -117.6200       7.0       137       214        91
WVCT   2025250     91400   20.7600 -117.6700       7.4       143       211        99
WVCT   2025250     91400   20.6900 -117.8100       8.6       159       204        95
WVCT   2025250     91400   20.7600 -118.4600       4.5       127       193        97
WVCT   2025250     91400   20.7300 -118.5500       4.3       103       193        96
WVCT   2025250     91400   20.9100 -110.4500       5.6       293       216        92
WVCT   2025250     91400   20.9100 -110.4700       5.2       292       217        82
WVCT   2025250     91400   20.8100 -112.1500       6.4       160       167        96
WVCT   2025250     91400   20.7400 -112.9000       6.4       175       187        99
WVCT   2025250     91400   20.7400 -113.0900       8.9       174       177        96
WVCT   2025250     91400   20.8200 -113.1400      11.3       171       178        98
WVCT   2025250     91400   20.7300 -113.3200       9.6       163       184        99
WVCT   2025250     91400   20.7500 -113.3400       9.9       163       185       100
WVCT   2025250     91400   20.7200 -113.4900       8.0       164       189       100
WVCT   2025250     91400   20.7800 -113.5900       9.7       169       181       100
WVCT   2025250     91400   20.7400 -113.7200      10.2       173       179        98
WVCT   2025250     91400   20.7300 -113.9000      11.8       165       188        88
WVCT   2025250     91400   20.7100 -114.0000      10.8       154       188        98
WVCT   2025250     91400   20.7000 -114.1200       8.9       162       189        95
WVCT   2025250     91400   20.7800 -114.2600      11.2       197       199        63
WVCT   2025250     91400   20.7100 -114.5300      12.8       162       191        99
WVCT   2025250     91400   20.7300 -114.7100      10.2       162       193       100
WVCT   2025250     91400   20.6800 -114.8300       9.6       156       198        99
WVCT   2025250     91400   20.6800 -114.9000       9.2       153       202        89
WVCT   2025250     91400   20.7100 -115.0500      11.7       151       199        94
WVCT   2025250     91400   20.6900 -115.1000      12.3       153       199       100
WVCT   2025250     91400   20.7300 -115.2100      15.1       147       185        95
WVCT   2025250     91400   20.6600 -115.3800      16.7       149       197        89
WVCT   2025250     91400   20.7000 -115.5100      15.8       149       198        99
WVCT   2025250     91400   20.7200 -115.6000      14.4       154       198       100
WVCT   2025250     91400   20.6500 -115.7200      11.7       157       200       100
WVCT   2025250     91400   20.7300 -115.8400      10.1       164       183        99
WVCT   2025250     91400   20.7300 -115.8700      10.0       167       181        99
WVCT   2025250     91400   20.7300 -116.0000      12.5       176       173       100
WVCT   2025250     91400   20.6400 -116.1500      13.0       174       174       100
WVCT   2025250     91400   20.6400 -116.2200      12.1       170       182        96
WVCT   2025250     91400   20.6300 -116.4000       7.5       159       198        99
WVCT   2025250     91400   20.6500 -116.5100       8.1       165       198       100
WVCT   2025250     91400   20.7100 -116.5900      10.2       167       206        99
WVCT   2025250     91400   20.7100 -116.6600      10.7       170       206        98
WVCT   2025250     91400   20.6400 -116.8500       7.4       174       213       100
WVCT   2025250     91400   20.6400 -116.9800       6.8       189       188        77
WVCT   2025250     91400   20.6800 -117.0000       5.7       198       188        75
WVCT   2025250     91400   20.6100 -117.1400       7.0       209       179        78
WVCT   2025250     91400   20.6500 -117.3100       5.3       170       176       100
WVCT   2025250     91400   20.6400 -117.4200       7.0       173       179       100
WVCT   2025250     91400   20.6200 -117.5200       6.7       165       180       100
WVCT   2025250     91400   20.6200 -117.5600       6.3       154       182        99
WVCT   2025250     91400   20.5900 -117.7600       8.6       151       203        97
WVCT   2025250     91400   20.6500 -117.8200       9.4       160       204        99
WVCT   2025250     91400   20.6700 -117.9000       7.4       171       193        93
WVCT   2025250     91400   20.5700 -118.4700       4.1        46       183        95
WVCT   2025250     91400   20.8000 -108.2500       7.4        84       194        95
WVCT   2025250     91400   20.8000 -108.3800       7.6        88       191        94
WVCT   2025250     91400   20.8000 -108.4000       7.9        88       190        96
WVCT   2025250     91400   20.7900 -108.5800       9.8        92       195        86
WVCT   2025250     91400   20.7700 -109.1600       7.4        89       129        63
WVCT   2025250     91400   20.7500 -111.3300       7.6       139       169        64
WVCT   2025250     91400   20.6900 -111.4200       7.6       148       165        94
WVCT   2025250     91400   20.7200 -112.9500       6.1       174       186        83
WVCT   2025250     91400   20.6800 -113.0800       8.0       171       176        93
WVCT   2025250     91400   20.6700 -113.2400       8.0       166       180       100
WVCT   2025250     91400   20.6500 -113.2700       8.0       166       180       100
WVCT   2025250     91400   20.7000 -113.4500       7.6       161       187       100
WVCT   2025250     91400   20.6800 -113.5200       7.7       161       192        99
WVCT   2025250     91400   20.7000 -113.7000       9.7       172       180       100
WVCT   2025250     91400   20.6900 -113.8000      10.0       172       181        95
WVCT   2025250     91400   20.6100 -113.9300       8.8       163       183       100
WVCT   2025250     91400   20.6900 -114.0100      10.0       150       187        98
WVCT   2025250     91400   20.6800 -114.1000       8.7       155       189        98
WVCT   2025250     91400   20.6800 -114.2600       8.7       180       188        69
WVCT   2025250     91400   20.6600 -114.3100       9.6       176       186        64
WVCT   2025250     91400   20.6300 -114.4800      12.1       156       187        84
WVCT   2025250     91400   20.6100 -114.5700      11.7       157       191        86
WVCT   2025250     91400   20.6000 -114.7600      11.0       155       198        98
WVCT   2025250     91400   20.6600 -114.8600      10.0       156       200        98
WVCT   2025250     91400   20.6600 -114.9100       9.7       154       201        93
WVCT   2025250     91400   20.5700 -115.0200      12.3       153       200        99
WVCT   2025250     91400   20.6100 -115.1400      11.5       146       198       100
WVCT   2025250     91400   20.5600 -115.3100      13.4       145       200       100
WVCT   2025250     91400   20.6000 -115.4400      16.1       149       200       100
WVCT   2025250     91400   20.5600 -115.4700      14.9       153       200        85
WVCT   2025250     91400   20.5500 -115.6800      14.7       157       191        99
WVCT   2025250     91400   20.5500 -115.7700      12.7       157       179       100
WVCT   2025250     91400   20.6100 -115.8200      11.9       158       196       100
WVCT   2025250     91400   20.6000 -115.9800      13.6       167       196       100
WVCT   2025250     91400   20.6000 -116.1200      12.5       169       191        99
WVCT   2025250     91400   20.6200 -116.1400      12.6       172       176       100
WVCT   2025250     91400   20.6000 -116.2500      10.8       170       189        89
WVCT   2025250     91400   20.5300 -116.3800       8.5       171       190        98
WVCT   2025250     91400   20.5500 -116.5300       7.2       167       196       100
WVCT   2025250     91400   20.5500 -116.6000       8.3       168       197        98
WVCT   2025250     91400   20.6000 -116.7400       8.4       174       207       100
WVCT   2025250     91400   20.5600 -116.9100       5.4       191       205        92
WVCT   2025250     91400   20.5700 -117.0200       7.9       194       189        79
WVCT   2025250     91400   20.5500 -117.1300       8.5       203       185        79
WVCT   2025250     91400   20.5700 -117.1700       7.8       200       177        86
WVCT   2025250     91400   20.5500 -117.2600       7.3       191       174        97
WVCT   2025250     91400   20.5000 -117.3800       7.9       179       178        99
WVCT   2025250     91400   20.5200 -117.5600       5.7       163       180        98
WVCT   2025250     91400   20.5100 -117.6900       5.5       135       179        96
WVCT   2025250     91400   20.5300 -117.7100       6.1       136       180        96
WVCT   2025250     91400   20.5100 -117.8500       4.8       160       177        92
WVCT   2025250     91400   20.5000 -118.3700       4.3       356       179        61
WVCT   2025250     91400   20.5300 -118.5200       4.2        25       181        98
WVCT   2025250     91400   20.4700 -118.6000       7.4       343       179        82
WVCT   2025250     91400   20.7000 -108.2500       5.7        99       199        96
WVCT   2025250     91400   20.7800 -108.3100       7.2        89       194        93
WVCT   2025250     91400   20.7700 -108.5100       8.2        90       193        96
WVCT   2025250     91400   20.7700 -108.6100       9.3        89       197        85
WVCT   2025250     91400   20.7500 -108.6700       9.7        87       201        94
WVCT   2025250     91400   20.7000 -108.9100       9.3        90       220        90
WVCT   2025250     91400   20.7600 -109.0100       8.1        71       192        60
WVCT   2025250     91400   20.7100 -109.1500       8.6        97       158        71
WVCT   2025250     91400   20.6900 -109.1800       8.5        93       158        75
WVCT   2025250     91400   20.6400 -111.1000       4.1        31       217        85
WVCT   2025250     91400   20.5900 -111.4200       4.1       141       163        88
WVCT   2025250     91400   20.5600 -112.3300       7.9       142       160        87
WVCT   2025250     91400   20.6100 -112.4800       8.0       147       160       100
WVCT   2025250     91400   20.6300 -112.5000       8.0       149       167       100
WVCT   2025250     91400   20.5500 -113.2000       7.6       166       177       100
WVCT   2025250     91400   20.5500 -113.2300       7.5       167       178       100
WVCT   2025250     91400   20.5200 -113.4400       8.2       158       189       100
WVCT   2025250     91400   20.5200 -113.5100       9.1       159       189        99
WVCT   2025250     91400   20.5100 -113.6700      10.5       163       188        98
WVCT   2025250     91400   20.5300 -113.6900      10.4       162       188        99
WVCT   2025250     91400   20.5100 -113.8100       9.3       161       188        98
WVCT   2025250     91400   20.5000 -114.0000       7.9       159       183        93
WVCT   2025250     91400   20.5800 -114.1200       7.7       146       177        83
WVCT   2025250     91400   20.5600 -114.1500       7.6       146       172        80
WVCT   2025250     91400   20.5300 -114.3600       8.7       145       172        88
WVCT   2025250     91400   20.5700 -114.4700      10.6       152       176        77
WVCT   2025250     91400   20.5300 -114.5900       8.8       166       177        89
WVCT   2025250     91400   20.5000 -114.6700       8.9       166       198        88
WVCT   2025250     91400   20.4800 -114.8100       9.5       163       205       100
WVCT   2025250     91400   20.4900 -114.9200      11.1       164       206        99
WVCT   2025250     91400   20.5500 -115.0000      12.7       154       201        99
WVCT   2025250     91400   20.5100 -115.1700      13.6       146       194       100
WVCT   2025250     91400   20.4600 -115.2400      13.0       146       194       100
WVCT   2025250     91400   20.5000 -115.3300      11.1       146       200        98
WVCT   2025250     91400   20.5400 -115.5000      14.6       156       200        78
WVCT   2025250     91400   20.4500 -115.6300      14.3       160       180       100
WVCT   2025250     91400   20.5300 -115.6600      15.0       157       181        99
WVCT   2025250     91400   20.5300 -115.7900      13.2       157       178       100
WVCT   2025250     91400   20.4600 -115.9700      13.3       159       175       100
WVCT   2025250     91400   20.4800 -115.9800      13.6       161       191       100
WVCT   2025250     91400   20.5200 -116.1600      10.9       165       189        94
WVCT   2025250     91400   20.5200 -116.2000      10.6       171       189        86
WVCT   2025250     91400   20.4900 -116.3200       9.9       180       189        77
WVCT   2025250     91400   20.4700 -116.4300       9.1       170       189       100
WVCT   2025250     91400   20.5100 -116.5400       7.3       166       196        99
WVCT   2025250     91400   20.4200 -116.7600       7.7       185       189        86
WVCT   2025250     91400   20.4200 -116.7800       7.5       186       189        81
WVCT   2025250     91400   20.4600 -116.8800       5.4       202       203        92
WVCT   2025250     91400   20.4700 -117.0100       5.3       197       201        93
WVCT   2025250     91400   20.4100 -117.1400       5.4       203       200        96
WVCT   2025250     91400   20.4600 -117.3000       5.8       200       177        84
WVCT   2025250     91400   20.4800 -117.3400       6.8       193       177        99
WVCT   2025250     91400   20.4400 -117.4400       5.9       187       179       100
WVCT   2025250     91400   20.4400 -117.5700       5.7       164       179        98
WVCT   2025250     91400   20.4700 -117.6800       5.0       137       178        99
WVCT   2025250     91400   20.4100 -118.6300       8.0       340       174        81
WVCT   2025250     91400   20.3600 -118.8600       6.0         4       183        99
WVCT   2025250     91400   20.3600 -118.8800       5.9         5       184        99
WVCT   2025250     91400   20.6300 -108.0700       6.8        83       205        98
WVCT   2025250     91400   20.6800 -108.2100       5.1        99       203        96
WVCT   2025250     91400   20.6200 -108.3300       4.3        68       193        77
WVCT   2025250     91400   20.6100 -108.5600       4.5        49       194        66
WVCT   2025250     91400   20.5800 -108.8100       7.8        86       207        96
WVCT   2025250     91400   20.5700 -108.9400       7.2        77       208        87
WVCT   2025250     91400   20.5900 -108.9800       7.3        74       208        94
WVCT   2025250     91400   20.6500 -109.1700       7.6        86       191        66
WVCT   2025250     91400   20.6500 -109.2200       7.8        86       165        77
WVCT   2025250     91400   20.5800 -109.3400       6.4        68       148        65
WVCT   2025250     91400   20.5500 -109.4700       5.3        77       136        81
WVCT   2025250     91400   20.5900 -110.8900       8.4       318       207        72
WVCT   2025250     91400   20.5800 -110.9200       7.3       321       206        70
WVCT   2025250     91400   20.5000 -111.1100       4.8       312       203        96
WVCT   2025250     91400   20.5400 -112.3100       7.6       144       161        88
WVCT   2025250     91400   20.4900 -112.4400       8.0       147       156        96
WVCT   2025250     91400   20.4500 -112.5200       7.8       155       156       100
WVCT   2025250     91400   20.4900 -112.6300       8.1       160       158        99
WVCT   2025250     91400   20.4300 -113.1800       7.6       156       182       100
WVCT   2025250     91400   20.4300 -113.2100       7.5       157       184       100
WVCT   2025250     91400   20.4200 -113.4200       9.1       160       193        98
WVCT   2025250     91400   20.4800 -113.5200       9.8       160       189        99
WVCT   2025250     91400   20.4300 -113.5800      10.5       161       191       100
WVCT   2025250     91400   20.4100 -113.6700      10.0       161       197        99
WVCT   2025250     91400   20.4900 -113.8000       9.3       159       190        99
WVCT   2025250     91400   20.4200 -113.9000       9.9       151       189       100
WVCT   2025250     91400   20.4800 -114.0000       7.9       158       181        96
WVCT   2025250     91400   20.4400 -114.2000       6.5       150       172        79
WVCT   2025250     91400   20.4100 -114.3400       8.4       126       174        90
WVCT   2025250     91400   20.4300 -114.4100       8.3       127       175        99
WVCT   2025250     91400   20.4200 -114.5500       6.8       158       185        70
WVCT   2025250     91400   20.3800 -114.6200       7.3       165       193        94
WVCT   2025250     91400   20.4200 -114.8000       7.4       169       204        97
WVCT   2025250     91400   20.4200 -114.8200       7.6       170       205        98
WVCT   2025250     91400   20.4500 -115.0200      11.8       156       202        86
WVCT   2025250     91400   20.4500 -115.0400      11.9       156       200        86
WVCT   2025250     91400   20.4300 -115.1800      12.2       151       195        95
WVCT   2025250     91400   20.3600 -115.3100       9.0       149       197       100
WVCT   2025250     91400   20.3600 -115.4900      10.4       152       188        96
WVCT   2025250     91400   20.3900 -115.5300      11.8       162       185        83
WVCT   2025250     91400   20.4300 -115.6100      13.9       160       180       100
WVCT   2025250     91400   20.3900 -115.8200      13.3       151       176        98
WVCT   2025250     91400   20.3800 -115.8700      13.0       152       174        99
WVCT   2025250     91400   20.4200 -115.9500      12.4       158       164       100
WVCT   2025250     91400   20.4200 -116.1300      10.5       159       164        98
WVCT   2025250     91400   20.3500 -116.2100      10.9       163       172        99
WVCT   2025250     91400   20.3500 -116.3700       9.2       201       190        89
WVCT   2025250     91400   20.3700 -116.4300       9.7       193       189        94
WVCT   2025250     91400   20.3200 -116.6200       6.9       167       186        86
WVCT   2025250     91400   20.4000 -116.7200       7.3       178       188        90
WVCT   2025250     91400   20.4000 -116.7400       7.3       179       188        87
WVCT   2025250     91400   20.3500 -116.9200       8.8       157       194        97
WVCT   2025250     91400   20.3500 -117.0100       9.6       156       200        93
WVCT   2025250     91400   20.3100 -117.0900      11.0       158       200       100
WVCT   2025250     91400   20.3600 -117.5000       4.1       173       178        94
WVCT   2025250     91400   20.3100 -117.6200       5.0       142       178       100
WVCT   2025250     91400   20.3300 -117.6400       5.2       143       178       100
WVCT   2025250     91400   20.3500 -117.7400       4.0       124       177        82
WVCT   2025250     91400   20.2800 -118.0000       7.7       329       185        62
WVCT   2025250     91400   20.3000 -118.1200       7.8       315       182        78
WVCT   2025250     91400   20.3500 -118.7100       5.1         4       170        61
WVCT   2025250     91400   20.2600 -118.8300       5.9       355       174        96
WVCT   2025250     91400   20.3200 -118.8400       6.6         0       181        99
WVCT   2025250     91400   20.2800 -118.9600       8.1       341       192        93
WVCT   2025250     91400   20.5800 -108.1100       6.5        69       206        88
WVCT   2025250     91400   20.5100 -108.3100       5.4        35       202        90
WVCT   2025250     91400   20.5500 -108.3500       4.1        33       193        78
WVCT   2025250     91400   20.5500 -108.9200       6.6        75       207        86
WVCT   2025250     91400   20.5500 -108.9700       6.4        65       207        85
WVCT   2025250     91400   20.5000 -109.1800       7.0        40       201        91
WVCT   2025250     91400   20.5400 -109.2700       5.9        62       158        92
WVCT   2025250     91400   20.5100 -109.4500       5.6        73       145        92
WVCT   2025250     91400   20.4600 -109.7900       4.6         1       175        94
WVCT   2025250     91400   20.5000 -109.9200       4.1       324       167        88
WVCT   2025250     91400   20.4100 -110.7200       7.0       324       208        61
WVCT   2025250     91400   20.4000 -110.8400       8.4       333       196        69
WVCT   2025250     91400   20.3800 -111.4300       4.5       152       160        73
WVCT   2025250     91400   20.3800 -111.4500       4.8       153       160        79
WVCT   2025250     91400   20.4200 -112.2500       7.1       142       154       100
WVCT   2025250     91400   20.4400 -112.2700       7.6       142       154       100
WVCT   2025250     91400   20.3500 -112.4300       7.7       148       153       100
WVCT   2025250     91400   20.4300 -112.5000       7.8       156       156       100
WVCT   2025250     91400   20.3600 -112.7300       7.1       158       156        98
WVCT   2025250     91400   20.3900 -112.9300       7.5       156       158       100
WVCT   2025250     91400   20.3500 -113.0100       6.8       156       159        99
WVCT   2025250     91400   20.4100 -113.2100       7.9       154       188       100
WVCT   2025250     91400   20.3600 -113.4100       9.6       159       199        98
WVCT   2025250     91400   20.3300 -113.5500      11.1       159       192        99
WVCT   2025250     91400   20.3900 -113.6600      10.0       160       201        95
WVCT   2025250     91400   20.3100 -113.7000      10.3       143       201        97
WVCT   2025250     91400   20.3000 -113.8800       8.0       160       178        75
WVCT   2025250     91400   20.3000 -113.9300       8.8       156       175        99
WVCT   2025250     91400   20.3000 -114.0500       8.3       159       185        61
WVCT   2025250     91400   20.2900 -114.1600       8.1       161       188        82
WVCT   2025250     91400   20.3100 -114.3400       8.2       151       191        99
WVCT   2025250     91400   20.2800 -114.4800       9.8       148       200        92
WVCT   2025250     91400   20.2800 -114.5100       9.9       148       200        95
WVCT   2025250     91400   20.3600 -114.6000       7.8       159       194        98
WVCT   2025250     91400   20.3400 -114.8200       6.2       166       199        79
WVCT   2025250     91400   20.3100 -114.8400       6.2       167       200        78
WVCT   2025250     91400   20.2700 -115.0600       5.0       189       208        83
WVCT   2025250     91400   20.2600 -115.1500       5.3       209       199        95
WVCT   2025250     91400   20.2600 -115.1900       5.6       191       194        61
WVCT   2025250     91400   20.2600 -115.4000      11.0       138       194        84
WVCT   2025250     91400   20.2700 -115.5100      12.1       148       177       100
WVCT   2025250     91400   20.3300 -115.5200      11.0       156       179        95
WVCT   2025250     91400   20.2700 -115.6700      13.0       159       178        96
WVCT   2025250     91400   20.2800 -115.8400      11.6       155       176        95
WVCT   2025250     91400   20.3200 -115.9000      11.4       157       165        95
WVCT   2025250     91400   20.2400 -116.0600       9.3       178       146        97
WVCT   2025250     91400   20.2700 -116.1800       9.6       167       150        93
WVCT   2025250     91400   20.2900 -116.2700       7.9       178       184        99
WVCT   2025250     91400   20.2700 -116.3200       6.4       197       188        89
WVCT   2025250     91400   20.2900 -116.4300       8.1       219       191        91
WVCT   2025250     91400   20.2800 -116.5800       7.8       186       187        92
WVCT   2025250     91400   20.2800 -116.7400       8.1       164       184        66
WVCT   2025250     91400   20.3000 -116.7600       7.8       164       185        67
WVCT   2025250     91400   20.2100 -116.9100       8.1       147       184        80
WVCT   2025250     91400   20.2700 -117.0100      11.2       150       197        99
WVCT   2025250     91400   20.2900 -117.0900      11.1       162       199        94
WVCT   2025250     91400   20.2200 -117.2800       5.3       219       185        73
WVCT   2025250     91400   20.2000 -117.9500       9.2       336       184        92
WVCT   2025250     91400   20.2400 -118.0500      10.6       320       184        72
WVCT   2025250     91400   20.2200 -118.1800       6.7       300       174        72
WVCT   2025250     91400   20.2600 -118.2600       4.9       307       172        97
WVCT   2025250     91400   20.2400 -118.8300       5.7       353       173        92
WVCT   2025250     91400   20.2200 -118.8600       6.5       351       173        97
WVCT   2025250     91400   20.1800 -119.0200      13.0       330       173        70
WVCT   2025250     91400   20.4200 -108.1300       9.8        75       199        94
WVCT   2025250     91400   20.4500 -108.3500       6.7        36       200        97
WVCT   2025250     91400   20.4500 -108.4300       4.7        20       190        94
WVCT   2025250     91400   20.4600 -108.7500       4.2        79       206        92
WVCT   2025250     91400   20.4300 -108.9300       5.8        44       206        91
WVCT   2025250     91400   20.4500 -109.0200       7.9        22       204        93
WVCT   2025250     91400   20.4000 -109.2400       9.2        53       205        95
WVCT   2025250     91400   20.4000 -109.2600       9.2        59       204        97
WVCT   2025250     91400   20.3900 -109.4600       5.8        65       155        98
WVCT   2025250     91400   20.4200 -109.8200       4.0       351       199        72
WVCT   2025250     91400   20.4200 -109.9200       4.8       318       195        65
WVCT   2025250     91400   20.3900 -110.7800       6.5       324       199        63
WVCT   2025250     91400   20.3600 -110.8800       6.3       343       196        73
WVCT   2025250     91400   20.3600 -111.4300       4.6       152       160        82
WVCT   2025250     91400   20.3600 -111.4500       4.9       153       160        89
WVCT   2025250     91400   20.3200 -112.0800       7.5       161       157        87
WVCT   2025250     91400   20.3000 -112.2100       5.1       144       152        99
WVCT   2025250     91400   20.2900 -112.4000       6.3       142       150       100
WVCT   2025250     91400   20.3300 -112.4100       7.4       146       152       100
WVCT   2025250     91400   20.3300 -112.5300       6.8       151       155        96
WVCT   2025250     91400   20.3000 -112.7500       6.6       150       155       100
WVCT   2025250     91400   20.2800 -112.7700       6.3       145       153       100
WVCT   2025250     91400   20.2700 -112.9200       6.1       149       152       100
WVCT   2025250     91400   20.2900 -113.0300       6.7       153       155        99
WVCT   2025250     91400   20.2600 -113.2000       8.7       144       148        85
WVCT   2025250     91400   20.2600 -113.2900       9.5       141       153        92
WVCT   2025250     91400   20.2600 -113.3600       9.9       144       176        95
WVCT   2025250     91400   20.3000 -113.4700      10.3       163       191       100
WVCT   2025250     91400   20.2300 -113.6700      10.2       140       178        96
WVCT   2025250     91400   20.2500 -113.7100      10.1       141       189        84
WVCT   2025250     91400   20.2000 -113.8600       7.5       167       169        65
WVCT   2025250     91400   20.1900 -114.3200      10.5       155       199        85
WVCT   2025250     91400   20.1800 -114.5100       9.6       154       204        99
WVCT   2025250     91400   20.1800 -114.5300       9.6       151       204       100
WVCT   2025250     91400   20.1800 -114.7100      10.1       136       200        75
WVCT   2025250     91400   20.1900 -114.7800       8.6       138       196        77
WVCT   2025250     91400   20.1700 -114.9000       6.8       154       201        99
WVCT   2025250     91400   20.1700 -115.0300       5.2       170       206        85
WVCT   2025250     91400   20.2400 -115.1800       5.3       210       195        97
WVCT   2025250     91400   20.2400 -115.3800      10.2       140       193        80
WVCT   2025250     91400   20.2300 -115.5200      13.3       148       177       100
WVCT   2025250     91400   20.2300 -115.6300      13.8       156       177        98
WVCT   2025250     91400   20.1400 -115.7600      11.0       160       179        99
WVCT   2025250     91400   20.2200 -115.8600      10.3       161       174        96
WVCT   2025250     91400   20.1400 -115.9400       9.4       176       163        98
WVCT   2025250     91400   20.1600 -116.0000      10.2       183       153        97
WVCT   2025250     91400   20.1700 -116.1800      11.0       179       143        98
WVCT   2025250     91400   20.1500 -116.2700      10.5       174       160       100
WVCT   2025250     91400   20.1300 -116.3700      11.4       179       186        85
WVCT   2025250     91400   20.1200 -116.5000      11.4       192       187        79
WVCT   2025250     91400   20.1200 -116.6400       8.4       189       183        99
WVCT   2025250     91400   20.1200 -116.7500       9.1       176       181        98
WVCT   2025250     91400   20.1700 -116.8300       8.0       162       182        73
WVCT   2025250     91400   20.1900 -116.9100       7.7       146       184        83
WVCT   2025250     91400   20.1100 -117.0400       4.5       149       184        88
WVCT   2025250     91400   20.1600 -117.2000       6.9       203       190        83
WVCT   2025250     91400   20.1400 -117.2500       5.9       222       184        79
WVCT   2025250     91400   20.1600 -117.9700      10.5       337       183        93
WVCT   2025250     91400   20.1600 -118.1300      10.7       307       176        86
WVCT   2025250     91400   20.0900 -118.2900       4.3       296       171        91
WVCT   2025250     91400   20.1400 -118.8500       5.6       353       172        90
WVCT   2025250     91400   20.1400 -118.8900       8.2       343       172        80
WVCT   2025250     91400   20.3300 -108.2300       7.6        86       202        92
WVCT   2025250     91400   20.2900 -108.3700       4.0        41       199       100
WVCT   2025250     91400   20.3400 -108.6800       5.3        73       179        98
WVCT   2025250     91400   20.2900 -108.7900      10.8        78       192        99
WVCT   2025250     91400   20.2900 -108.9200      11.2        76       206        72
WVCT   2025250     91400   20.3200 -109.1300       7.2        12       205        96
WVCT   2025250     91400   20.3000 -109.2400       8.2        40       204        97
WVCT   2025250     91400   20.3100 -109.3800       7.5        55       198        90
WVCT   2025250     91400   20.3100 -109.4600       6.3        56       155        97
WVCT   2025250     91400   20.2800 -109.5600       4.0        54       214        83
WVCT   2025250     91400   20.1900 -111.8100       7.4       140       170        97
WVCT   2025250     91400   20.2000 -111.9200       7.3       141       170       100
WVCT   2025250     91400   20.2000 -112.0200       7.3       152       162       100
WVCT   2025250     91400   20.1600 -112.1200       4.9       145       155        95
WVCT   2025250     91400   20.1900 -112.3000       4.2       112       150        98
WVCT   2025250     91400   20.2300 -112.3900       4.8       121       151       100
WVCT   2025250     91400   20.1400 -112.5500       5.4       121       152        99
WVCT   2025250     91400   20.1600 -112.6100       5.2       124       152        99
WVCT   2025250     91400   20.2000 -112.7500       6.2       126       151       100
WVCT   2025250     91400   20.1700 -112.8200       6.4       124       147        84
WVCT   2025250     91400   20.1300 -113.0000       9.7       128       141        89
WVCT   2025250     91400   20.2100 -113.1200       7.7       136       145        96
WVCT   2025250     91400   20.1200 -113.1600       7.4       124       139        70
WVCT   2025250     91400   20.1400 -113.3700       8.1       117       135        69
WVCT   2025250     91400   20.1300 -113.4600      14.0       106       133        81
WVCT   2025250     91400   20.1900 -113.7000       9.4       134       141        97
WVCT   2025250     91400   20.1800 -113.8200       7.1       166       149        73
WVCT   2025250     91400   20.1800 -113.9100       7.0       182       156        85
WVCT   2025250     91400   20.1600 -114.5600       9.4       147       204        98
WVCT   2025250     91400   20.1500 -114.7400      10.5       137       200        79
WVCT   2025250     91400   20.1500 -114.7600      10.2       138       197        82
WVCT   2025250     91400   20.0900 -114.9600       8.0       154       201        93
WVCT   2025250     91400   20.1500 -115.0400       5.5       166       206        82
WVCT   2025250     91400   20.0800 -115.1200       6.6       164       201        88
WVCT   2025250     91400   20.0600 -115.2600      10.1       163       192        98
WVCT   2025250     91400   20.0500 -115.3700      15.2       154       191        97
WVCT   2025250     91400   20.1300 -115.4500      16.3       150       192        94
WVCT   2025250     91400   20.0900 -115.6400      13.6       155       186        99
WVCT   2025250     91400   20.0600 -115.7500       9.1       149       175        99
WVCT   2025250     91400   20.0800 -115.7900       8.6       157       175        99
WVCT   2025250     91400   20.1200 -115.9400       8.9       175       165        98
WVCT   2025250     91400   20.0800 -116.0200       9.1       178       154       100
WVCT   2025250     91400   20.0300 -116.2300       9.9       182       145        99
WVCT   2025250     91400   20.0900 -116.3100      11.1       171       168       100
WVCT   2025250     91400   20.0700 -116.4000      12.5       171       179        91
WVCT   2025250     91400   20.0200 -116.5000      10.8       170       180        90
WVCT   2025250     91400   20.0800 -116.6700       7.5       183       180        97
WVCT   2025250     91400   20.0400 -116.7200       6.0       171       180        86
WVCT   2025250     91400   20.0100 -116.8100       6.4       171       182        79
WVCT   2025250     91400   20.0700 -117.0000       5.1       151       183        90
WVCT   2025250     91400   20.0900 -117.0200       4.5       146       183        89
WVCT   2025250     91400   19.9800 -118.8600       5.4         7       173        95
WVCT   2025250     91400   19.9700 -118.9900       6.8       358       173        74
WVCT   2025250     91400   19.9700 -119.0500       8.3       353       175        66
WVCT   2025250     91400   20.2100 -108.1900       4.5       107       210        74
WVCT   2025250     91400   20.2400 -108.6400       7.1        43       186        95
WVCT   2025250     91400   20.2500 -108.7800      11.3        71       192       100
WVCT   2025250     91400   20.1600 -108.9300      11.3        64       203        82
WVCT   2025250     91400   20.1600 -108.9500      10.3        60       207        77
WVCT   2025250     91400   20.2000 -109.1700       4.6         7       209        98
WVCT   2025250     91400   20.2100 -109.2400       6.0        19       201        97
WVCT   2025250     91400   20.2100 -109.4100       6.7        35       176        83
WVCT   2025250     91400   20.2300 -109.4300       6.5        40       183        83
WVCT   2025250     91400   20.1300 -109.8700       4.3       115       158        89
WVCT   2025250     91400   20.1100 -110.5300       6.3       354       166        82
WVCT   2025250     91400   20.1100 -110.5600       5.8       356       167        82
WVCT   2025250     91400   20.0700 -111.6200       9.1       114       202        99
WVCT   2025250     91400   20.0600 -111.9100       7.6       134       169       100
WVCT   2025250     91400   20.1000 -112.0200       6.2       122       164        97
WVCT   2025250     91400   20.1200 -112.1100       4.5       131       157        93
WVCT   2025250     91400   20.0400 -112.4300       6.2       125       154       100
WVCT   2025250     91400   20.0400 -112.5000       6.4       130       155       100
WVCT   2025250     91400   20.0400 -112.6400       6.4       135       153        99
WVCT   2025250     91400   20.0300 -112.7400       6.9       134       148        93
WVCT   2025250     91400   20.0500 -112.8700       6.8       130       143        91
WVCT   2025250     91400   20.1100 -112.9300       8.8       132       142        86
WVCT   2025250     91400   20.1000 -113.0900       9.1       125       140        84
WVCT   2025250     91400   20.1000 -113.3500       4.4       122       131        69
WVCT   2025250     91400   20.0300 -113.5000      14.5        97       123        93
WVCT   2025250     91400   20.0500 -113.6200      15.6       100       126        94
WVCT   2025250     91400   20.0000 -113.7000      11.7       104       122        81
WVCT   2025250     91400   20.0400 -113.7800       6.8       115       125        89
WVCT   2025250     91400   20.0100 -114.2200       8.0       263       132        84
WVCT   2025250     91400   19.9800 -114.5700       5.5       246       190        89
WVCT   2025250     91400   19.9700 -114.6900       6.7       164       199        84
WVCT   2025250     91400   20.0500 -114.8800       9.3       152       197        89
WVCT   2025250     91400   20.0300 -114.9000       9.2       152       199        92
WVCT   2025250     91400   19.9800 -115.0300       9.0       155       200        90
WVCT   2025250     91400   19.9600 -115.1700       9.4       158       200        95
WVCT   2025250     91400   20.0000 -115.2700      10.9       157       195       100
WVCT   2025250     91400   20.0100 -115.3600      14.0       155       191        96
WVCT   2025250     91400   19.9500 -115.4800      13.5       154       192       100
WVCT   2025250     91400   19.9700 -115.6400       9.7       157       178        96
WVCT   2025250     91400   20.0200 -115.7600       8.2       148       174        95
WVCT   2025250     91400   19.9600 -115.8900       6.3       146       163        86
WVCT   2025250     91400   19.9800 -115.9700       7.1       153       157        99
WVCT   2025250     91400   19.9900 -116.0600       7.9       168       150       100
WVCT   2025250     91400   20.0100 -116.2300       9.5       183       146        98
WVCT   2025250     91400   19.9500 -116.3600       6.8       170       174        98
WVCT   2025250     91400   19.9600 -116.4700       7.4       167       176        84
WVCT   2025250     91400   19.9800 -116.4900       8.2       168       176        82
WVCT   2025250     91400   19.9100 -116.8300       5.1       152       180        97
WVCT   2025250     91400   19.9900 -117.0200       6.5       157       184        85
WVCT   2025250     91400   19.9000 -118.7200       7.0       358       174        79
WVCT   2025250     91400   19.8800 -118.8700       7.3         1       176        90
WVCT   2025250     91400   19.9400 -118.9500       6.5       359       175        86
WVCT   2025250     91400   19.8900 -119.0200       7.8       346       175        88
WVCT   2025250     91400   20.0900 -108.7000      10.4        67       185        70
WVCT   2025250     91400   20.1100 -108.7700      11.8        71       187        86
WVCT   2025250     91400   20.1000 -108.9500       9.9        60       199        80
WVCT   2025250     91400   20.1400 -108.9600       9.5        65       207        91
WVCT   2025250     91400   20.0700 -109.4200       6.4        40       175        68
WVCT   2025250     91400   20.0600 -109.5500       5.7        54       175        67
WVCT   2025250     91400   20.1100 -109.8500       4.7       123       158        93
WVCT   2025250     91400   20.0200 -110.0000       5.2       105       167        94
WVCT   2025250     91400   20.0700 -110.5200       5.2       344       182        85
WVCT   2025250     91400   20.0700 -110.5700       4.4       351       202        86
WVCT   2025250     91400   19.9700 -111.6200       9.1       106       165        92
WVCT   2025250     91400   19.9600 -111.7600       9.7       126       164        96
WVCT   2025250     91400   20.0200 -111.8700       9.1       143       167       100
WVCT   2025250     91400   20.0000 -111.9200       7.6       142       160       100
WVCT   2025250     91400   19.9400 -112.4100       7.8       147       154        98
WVCT   2025250     91400   20.0000 -112.5800       7.1       140       156       100
WVCT   2025250     91400   20.0200 -112.6000       6.7       137       155        99
WVCT   2025250     91400   19.9700 -112.7300       7.9       145       148        97
WVCT   2025250     91400   20.0100 -112.8400       7.0       132       145        93
WVCT   2025250     91400   20.0100 -112.9800       7.1       126       132        98
WVCT   2025250     91400   19.9100 -113.4900       4.1       117       115        97
WVCT   2025250     91400   19.9700 -113.6300      15.6        98       117        96
WVCT   2025250     91400   19.9900 -113.6500      14.6        99       120        94
WVCT   2025250     91400   19.9200 -113.8800       5.2       104       113        76
WVCT   2025250     91400   19.9000 -113.9300       5.1       110       112        63
WVCT   2025250     91400   19.9500 -114.1900       6.1       245       126        67
WVCT   2025250     91400   19.9600 -114.3200       5.9       246       137        84
WVCT   2025250     91400   19.9400 -114.3700       6.7       256       140        90
WVCT   2025250     91400   19.9400 -114.5300       5.2       248       156        83
WVCT   2025250     91400   19.9600 -114.6000       5.3       244       173        94
WVCT   2025250     91400   19.8900 -114.8000       6.9       166       198        96
WVCT   2025250     91400   19.8700 -114.8200       7.1       166       199        99
WVCT   2025250     91400   19.8800 -115.0000       8.9       158       201        94
WVCT   2025250     91400   19.9400 -115.0300       9.2       156       200        92
WVCT   2025250     91400   19.8600 -115.2300       9.2       158       195        99
WVCT   2025250     91400   19.8700 -115.3000       9.8       154       195        91
WVCT   2025250     91400   19.8900 -115.4500      12.0       149       193        97
WVCT   2025250     91400   19.8900 -115.5900       9.9       160       187        99
WVCT   2025250     91400   19.8900 -115.6100       9.6       161       181        99
WVCT   2025250     91400   19.8400 -115.7500       5.8       167       167        79
WVCT   2025250     91400   19.9200 -115.9200       5.6       144       156        84
WVCT   2025250     91400   19.8500 -116.0400       6.3       154       145        93
WVCT   2025250     91400   19.8500 -116.0900       6.7       160       145        96
WVCT   2025250     91400   19.8700 -116.2400       8.1       174       156        96
WVCT   2025250     91400   19.8600 -116.3500       6.9       176       174        97
WVCT   2025250     91400   19.8600 -116.4200       5.3       167       177        76
WVCT   2025250     91400   19.8900 -116.8100       4.6       145       177        99
WVCT   2025250     91400   19.8100 -116.9000       5.8       141       179        85
WVCT   2025250     91400   19.8300 -116.9800       7.6       156       182        87
WVCT   2025250     91400   19.8000 -117.0700       7.8       158       192        99
WVCT   2025250     91400   19.7800 -117.8700       4.5       307       156        89
WVCT   2025250     91400   19.8600 -117.9400       4.1       333       155        75
WVCT   2025250     91400   19.7800 -118.1300       4.1        74       143       100
WVCT   2025250     91400   19.7900 -118.1900       4.6        79       146        83
WVCT   2025250     91400   19.8100 -118.3400       6.1        87       151        86
WVCT   2025250     91400   19.8100 -118.3900       6.2        89       153        83
WVCT   2025250     91400   19.7600 -118.6600       6.2       353       165        84
WVCT   2025250     91400   19.8200 -118.7500       9.2         3       171        98
WVCT   2025250     91400   19.8400 -118.9000       7.6         2       176        80
WVCT   2025250     91400   19.8200 -118.9300       7.9       360       175        94
WVCT   2025250     91400   20.0500 -108.6900       8.8        74       184        64
WVCT   2025250     91400   19.9600 -108.8300       7.8       107       169       100
WVCT   2025250     91400   19.9600 -108.9100       7.0       102       172        85
WVCT   2025250     91400   19.9700 -109.1000       5.4        34       211        66
WVCT   2025250     91400   20.0100 -109.1900       4.4        29       209        87
WVCT   2025250     91400   20.0300 -109.3400       5.4        47       173        79
WVCT   2025250     91400   20.0100 -109.3700       5.3        45       172        89
WVCT   2025250     91400   19.9600 -109.5700       6.3        57       174        71
WVCT   2025250     91400   19.9700 -109.7200       9.3        71       177        81
WVCT   2025250     91400   20.0100 -109.7800       9.1        69       175        83
WVCT   2025250     91400   19.9300 -109.8800       8.2        95       176        94
WVCT   2025250     91400   20.0100 -109.9800       5.6       102       169        93
WVCT   2025250     91400   19.8900 -111.4300       5.7       108       165        85
WVCT   2025250     91400   19.9500 -111.7500       9.2       117       162        93
WVCT   2025250     91400   19.9200 -111.8700       8.0       140       158        96
WVCT   2025250     91400   19.8600 -112.3800       7.2       149       148        94
WVCT   2025250     91400   19.9000 -112.4200       7.9       147       154        99
WVCT   2025250     91400   19.8600 -112.5200       8.0       142       161       100
WVCT   2025250     91400   19.8300 -112.6900       9.2       151       152        98
WVCT   2025250     91400   19.8500 -112.7600       9.8       154       144        86
WVCT   2025250     91400   19.8300 -112.8800       7.9       151       129        74
WVCT   2025250     91400   19.8800 -113.6500      15.0        96       109        86
WVCT   2025250     91400   19.8800 -113.9100       5.3       103       111        76
WVCT   2025250     91400   19.8300 -114.6300       5.8       160       149        63
WVCT   2025250     91400   19.7700 -114.7300       5.0       169       152        85
WVCT   2025250     91400   19.8500 -114.8300       6.9       167       197        97
WVCT   2025250     91400   19.8200 -115.0100       8.6       162       201        99
WVCT   2025250     91400   19.8000 -115.0900       9.2       162       198       100
WVCT   2025250     91400   19.8400 -115.2100       8.8       160       195        99
WVCT   2025250     91400   19.7900 -115.2900       8.5       161       190        93
WVCT   2025250     91400   19.8100 -115.4000       9.2       154       190        83
WVCT   2025250     91400   19.7900 -115.5800       7.5       163       189        88
WVCT   2025250     91400   19.8000 -115.6500       7.4       165       174        88
WVCT   2025250     91400   19.7300 -115.9800       4.3       159       142        65
WVCT   2025250     91400   19.8100 -116.1600       8.1       164       147        94
WVCT   2025250     91400   19.7300 -116.2700       9.2       166       156        99
WVCT   2025250     91400   19.7200 -116.4000       7.5       173       174        94
WVCT   2025250     91400   19.7200 -116.4500       5.8       175       177        95
WVCT   2025250     91400   19.7900 -116.8800       5.1       141       179        85
WVCT   2025250     91400   19.7700 -116.9700       6.1       148       180        77
WVCT   2025250     91400   19.7400 -117.1100       5.6       158       192        95
WVCT   2025250     91400   19.7200 -117.2200       4.4       176       192        67
WVCT   2025250     91400   19.7600 -117.8900       5.3       305       153        94
WVCT   2025250     91400   19.7500 -118.1600       5.0        87       144        95
WVCT   2025250     91400   19.6700 -118.2400       5.9        99       155        94
WVCT   2025250     91400   19.6700 -118.3200       4.2        91       161        99
WVCT   2025250     91400   19.6800 -118.8200       7.0        25       164        83
WVCT   2025250     91400   19.6600 -118.8900       6.8        25       163        97
WVCT   2025250     91400   19.6700 -119.0200       8.2         5       165       100
WVCT   2025250     91400   19.6500 -119.1100      11.2       351       166        78
WVCT   2025250     91400   19.8800 -108.7600       6.5       143       168        73
WVCT   2025250     91400   19.9400 -108.8100       7.6       120       167        98
WVCT   2025250     91400   19.8600 -108.9400       8.7       144       168        93
WVCT   2025250     91400   19.9300 -109.1100       4.2        39       211        75
WVCT   2025250     91400   19.9300 -109.1600       6.0        26       210        82
WVCT   2025250     91400   19.8700 -109.2800       6.0        59       176        84
WVCT   2025250     91400   19.8600 -109.4000       5.2        67       171        93
WVCT   2025250     91400   19.8800 -109.6000       6.7        80       175        87
WVCT   2025250     91400   19.9100 -109.7300       9.3        78       178        93
WVCT   2025250     91400   19.9100 -109.8600       8.9        91       182       100
WVCT   2025250     91400   19.8200 -110.0000       5.3        74       182        67
WVCT   2025250     91400   19.8000 -111.2300       4.8        72       182        97
WVCT   2025250     91400   19.8100 -111.4400       7.9       100       166        89
WVCT   2025250     91400   19.7600 -112.3800       5.7       143       148        97
WVCT   2025250     91400   19.7800 -112.4200       6.1       143       150        99
WVCT   2025250     91400   19.7300 -112.6400       7.3       146       151        95
WVCT   2025250     91400   19.7700 -112.7000       8.4       152       146        99
WVCT   2025250     91400   19.8100 -112.7600       9.6       157       141        90
WVCT   2025250     91400   19.8100 -112.8800       7.2       158       128        63
WVCT   2025250     91400   19.7200 -113.0200       6.8       213       124        62
WVCT   2025250     91400   19.7100 -113.2700       6.7       186       113        79
WVCT   2025250     91400   19.6800 -114.5200      15.9       160       128        96
WVCT   2025250     91400   19.7500 -114.7100       5.9       164       150        84
WVCT   2025250     91400   19.7100 -114.7600       5.0       163       153        65
WVCT   2025250     91400   19.6600 -114.9300       6.1       172       163        90
WVCT   2025250     91400   19.7400 -115.0300       8.7       165       202        97
WVCT   2025250     91400   19.6800 -115.0900       9.7       166       202        95
WVCT   2025250     91400   19.7300 -115.2800       8.3       165       188        95
WVCT   2025250     91400   19.6900 -115.3300       8.8       165       188        96
WVCT   2025250     91400   19.6500 -115.4500      10.7       162       189        93
WVCT   2025250     91400   19.7200 -115.6200       5.9       167       187        68
WVCT   2025250     91400   19.6400 -115.8800       5.3       175       141        75
WVCT   2025250     91400   19.7100 -115.9800       5.3       160       142        70
WVCT   2025250     91400   19.7100 -116.1100       9.5       159       146        71
WVCT   2025250     91400   19.6600 -116.3000       7.6       171       153        97
WVCT   2025250     91400   19.6400 -116.3300       7.2       173       153        97
WVCT   2025250     91400   19.6600 -116.5000       4.4       179       177        94
WVCT   2025250     91400   19.6200 -116.5800       4.1       211       177        63
WVCT   2025250     91400   19.6000 -118.0800       5.6        67       142        89
WVCT   2025250     91400   19.6200 -118.0900       5.8        73       142        81
WVCT   2025250     91400   19.6100 -118.2200       6.2        98       161        68
WVCT   2025250     91400   19.6500 -118.3100       4.5        98       164        96
WVCT   2025250     91400   19.6500 -118.4100       4.1        70       165        97
WVCT   2025250     91400   19.5600 -118.5400       5.2        25       167        69
WVCT   2025250     91400   19.5800 -118.6900       6.9        29       162        95
WVCT   2025250     91400   19.5800 -118.8400       7.0        29       162        94
WVCT   2025250     91400   19.5800 -118.8600       6.9        28       162        96
WVCT   2025250     91400   19.5500 -119.0400       8.3        37       163        80
WVCT   2025250     91400   19.7800 -108.3600       7.7        93       182        96
WVCT   2025250     91400   19.7700 -108.5400       4.4        91       172        74
WVCT   2025250     91400   19.8400 -108.7700       5.2       151       168        84
WVCT   2025250     91400   19.8200 -108.9200       8.6       149       166        98
WVCT   2025250     91400   19.8300 -109.1400       5.3        41       214        71
WVCT   2025250     91400   19.8300 -109.2700       6.6        66       206        90
WVCT   2025250     91400   19.8200 -109.3200       6.6        65       176        96
WVCT   2025250     91400   19.7400 -109.4900       5.0        78       174        87
WVCT   2025250     91400   19.8200 -109.5600       5.8        70       175       100
WVCT   2025250     91400   19.8100 -109.6600       7.2        70       177        78
WVCT   2025250     91400   19.8000 -109.9800       6.0        78       182        83
WVCT   2025250     91400   19.7300 -110.8200       4.8        53       211        95
WVCT   2025250     91400   19.7100 -110.9500       6.0        55       201       100
WVCT   2025250     91400   19.7700 -111.0300       4.8        72       196        99
WVCT   2025250     91400   19.6800 -111.1900       7.7        90       179        99
WVCT   2025250     91400   19.6800 -111.2600       8.5        99       173       100
WVCT   2025250     91400   19.7100 -111.4200       7.7        97       165        95
WVCT   2025250     91400   19.6600 -111.8400       4.4        77       157        88
WVCT   2025250     91400   19.6500 -112.1900       6.6       132       148        86
WVCT   2025250     91400   19.6400 -112.3100       6.4       133       150        97
WVCT   2025250     91400   19.6400 -112.3300       6.3       134       149        96
WVCT   2025250     91400   19.7000 -112.4900       6.0       137       150        94
WVCT   2025250     91400   19.7100 -112.6500       7.0       148       150        90
WVCT   2025250     91400   19.6700 -112.6800       6.1       157       148        89
WVCT   2025250     91400   19.6500 -112.8000       7.6       184       140        88
WVCT   2025250     91400   19.6600 -112.9600       8.1       202       128        74
WVCT   2025250     91400   19.6400 -113.1100       5.7       228       122        82
WVCT   2025250     91400   19.7000 -113.2100       8.7       202       114        94
WVCT   2025250     91400   19.6900 -113.2800       6.6       190       113        78
WVCT   2025250     91400   19.6500 -114.6600      14.0       151       136        63
WVCT   2025250     91400   19.6100 -114.7900       7.8       151       154        63
WVCT   2025250     91400   19.6500 -114.8000       5.9       159       155        62
WVCT   2025250     91400   19.6200 -114.9600       6.1       173       163        96
WVCT   2025250     91400   19.5600 -115.0700       7.0       171       202        79
WVCT   2025250     91400   19.6400 -115.1400       9.5       166       204        97
WVCT   2025250     91400   19.5900 -115.3500      12.3       165       192        99
WVCT   2025250     91400   19.6100 -115.3700      11.9       165       191       100
WVCT   2025250     91400   19.5900 -115.4900      12.0       163       189        94
WVCT   2025250     91400   19.5600 -115.6700       5.7       174       184        87
WVCT   2025250     91400   19.6200 -115.8000       4.0       189       158        94
WVCT   2025250     91400   19.6000 -115.8200       4.7       188       154        87
WVCT   2025250     91400   19.5300 -116.0100      10.9       174       145        91
WVCT   2025250     91400   19.5300 -116.0800       9.8       176       148        80
WVCT   2025250     91400   19.5400 -116.2600       5.9       178       139        90
WVCT   2025250     91400   19.6000 -116.2700       6.7       166       145        96
WVCT   2025250     91400   19.6000 -116.4500       4.7       185       172        99
WVCT   2025250     91400   19.6000 -116.5600       4.6       207       176        65
WVCT   2025250     91400   19.5100 -116.6800       7.3       205       177        80
WVCT   2025250     91400   19.5700 -116.7600       4.1       205       179        75
WVCT   2025250     91400   19.5200 -117.8000       4.0        29       156        71
WVCT   2025250     91400   19.4700 -118.1400       7.0        87       162        82
WVCT   2025250     91400   19.4900 -118.1600       7.6        84       166        98
WVCT   2025250     91400   19.4600 -118.5800       9.2        21       167        73
WVCT   2025250     91400   19.5200 -118.6300       8.4        24       165        73
WVCT   2025250     91400   19.5200 -118.7800       9.1        24       159        96
WVCT   2025250     91400   19.5000 -118.8300       8.7        27       157        86
WVCT   2025250     91400   19.4500 -118.9400      10.1        23       161        81
WVCT   2025250     91400   19.4900 -119.0500       9.6        37       165        73
WVCT   2025250     91400   19.7400 -108.3500       8.6       100       183        99
WVCT   2025250     91400   19.7500 -108.5200       5.6        96       172        84
WVCT   2025250     91400   19.6800 -108.8100       6.4         0       167        70
WVCT   2025250     91400   19.7100 -109.1700       7.8        11       220        97
WVCT   2025250     91400   19.6400 -109.2600       6.7        32       201        81
WVCT   2025250     91400   19.7000 -109.4200       5.1        68       176        86
WVCT   2025250     91400   19.7000 -109.4700       4.4        66       175        85
WVCT   2025250     91400   19.6300 -109.7600       4.3        29       175        73
WVCT   2025250     91400   19.6200 -109.8600       4.1        30       175        96
WVCT   2025250     91400   19.7000 -110.0300       6.3        98       175        60
WVCT   2025250     91400   19.7000 -110.0600       6.5       103       175        68
WVCT   2025250     91400   19.6200 -110.6100       4.7        91       211        96
WVCT   2025250     91400   19.6700 -110.7900       4.4        64       208        70
WVCT   2025250     91400   19.6300 -110.9200       6.1        58       194        66
WVCT   2025250     91400   19.6400 -111.1300       6.9        82       179        80
WVCT   2025250     91400   19.6600 -111.1700       7.5        84       179        93
WVCT   2025250     91400   19.6400 -111.3000       8.7       104       170       100
WVCT   2025250     91400   19.5900 -111.4000       4.8       107       159        95
WVCT   2025250     91400   19.6400 -111.6800       9.0        91       156        68
WVCT   2025250     91400   19.6400 -111.7500       7.6        84       156        70
WVCT   2025250     91400   19.6300 -112.0800       4.3       141       152        80
WVCT   2025250     91400   19.5500 -112.1900       6.2       127       154        96
WVCT   2025250     91400   19.6200 -112.3200       6.6       134       151        97
WVCT   2025250     91400   19.5400 -112.4100       7.8       143       151        98
WVCT   2025250     91400   19.6200 -112.4600       6.4       145       148        83
WVCT   2025250     91400   19.5600 -112.8900       8.2       190       135        99
WVCT   2025250     91400   19.5200 -112.9500       7.9       190       134        90
WVCT   2025250     91400   19.5400 -113.1500       4.4       237       120        75
WVCT   2025250     91400   19.4700 -114.6500      11.7       160       140        76
WVCT   2025250     91400   19.4700 -114.7500      10.6       150       149        80
WVCT   2025250     91400   19.5100 -114.7800       9.7       142       153        72
WVCT   2025250     91400   19.4500 -115.2200       9.3       168       204        95
WVCT   2025250     91400   19.5100 -115.3200      13.2       164       197        96
WVCT   2025250     91400   19.5300 -115.3400      13.4       165       196        98
WVCT   2025250     91400   19.4400 -115.5200      11.9       162       184        90
WVCT   2025250     91400   19.4400 -115.5800      10.9       169       186        87
WVCT   2025250     91400   19.4800 -115.7800       5.5       193       166        98
WVCT   2025250     91400   19.5000 -115.8000       5.0       194       165        99
WVCT   2025250     91400   19.4300 -116.0100       8.0       172       149        99
WVCT   2025250     91400   19.4500 -116.0500       8.2       175       151       100
WVCT   2025250     91400   19.5100 -116.2200       6.6       186       144        92
WVCT   2025250     91400   19.4400 -116.2800       5.6       185       142        92
WVCT   2025250     91400   19.4900 -116.6700       7.7       205       177        78
WVCT   2025250     91400   19.4800 -117.0900       4.5       354       172        93
WVCT   2025250     91400   19.4000 -117.7800       4.3        40       165        72
WVCT   2025250     91400   19.3800 -117.8100       4.0        43       164        77
WVCT   2025250     91400   19.4500 -118.1000       5.8        89       155        75
WVCT   2025250     91400   19.4500 -118.1200       6.4        87       157        76
WVCT   2025250     91400   19.4300 -118.3000       6.4        84       177        85
WVCT   2025250     91400   19.4200 -118.5800       9.9        19       167        78
WVCT   2025250     91400   19.3800 -118.7600      11.1        24       160       100
WVCT   2025250     91400   19.3800 -118.8100      11.2        20       156        99
WVCT   2025250     91400   19.4300 -118.9700      10.8        22       163        82
WVCT   2025250     91400   19.3500 -119.0300      12.5        13       173        76
WVCT   2025250     91400   19.4300 -119.1000      13.9         5       202        64
WVCT   2025250     91400   19.6500 -108.4000       9.3       100       182        95
WVCT   2025250     91400   19.6300 -108.4800       9.2        98       170        89
WVCT   2025250     91400   19.5600 -108.6700       7.2       107       166        86
WVCT   2025250     91400   19.6200 -108.8000       4.1        40       165        76
WVCT   2025250     91400   19.6300 -108.9500      13.8       359       170        74
WVCT   2025250     91400   19.6300 -108.9700      14.4       359       174        77
WVCT   2025250     91400   19.5900 -109.1300      10.8         1       185        85
WVCT   2025250     91400   19.5400 -109.3400       5.7        22       199        90
WVCT   2025250     91400   19.5600 -109.3600       5.3        30       200        93
WVCT   2025250     91400   19.6100 -109.4900       4.3        40       176        94
WVCT   2025250     91400   19.5300 -109.7100       4.8        35       174        86
WVCT   2025250     91400   19.5500 -109.7500       4.2        35       174        79
WVCT   2025250     91400   19.5100 -110.0500       9.0       103       171        91
WVCT   2025250     91400   19.5500 -110.1700       8.4       105       170        80
WVCT   2025250     91400   19.5000 -110.5400       5.5        60       195        85
WVCT   2025250     91400   19.5300 -110.6800       8.0       101       211       100
WVCT   2025250     91400   19.5300 -110.7500       7.6       116       194        92
WVCT   2025250     91400   19.4900 -110.8600       4.8       108       189        86
WVCT   2025250     91400   19.4800 -110.9500       4.4        78       179        71
WVCT   2025250     91400   19.5400 -111.0800       5.8        63       177        71
WVCT   2025250     91400   19.4900 -111.2800       5.7        92       171        96
WVCT   2025250     91400   19.5400 -111.6300       7.0        76       155        85
WVCT   2025250     91400   19.5200 -111.6800       9.0        73       155        98
WVCT   2025250     91400   19.5400 -111.8700       5.1        51       156        76
WVCT   2025250     91400   19.4900 -112.1100       5.1       125       154        99
WVCT   2025250     91400   19.5300 -112.1700       5.6       128       154        98
WVCT   2025250     91400   19.5000 -112.3400       7.2       139       156       100
WVCT   2025250     91400   19.5000 -112.3900       7.3       140       154        99
WVCT   2025250     91400   19.5000 -112.5100       5.2       147       149        90
WVCT   2025250     91400   19.4600 -112.9100       5.8       188       136        74
WVCT   2025250     91400   19.4200 -113.0400       5.3       189       129        99
WVCT   2025250     91400   19.4600 -113.0800       4.8       195       126        79
WVCT   2025250     91400   19.3800 -114.3300       6.1       131       123        96
WVCT   2025250     91400   19.3700 -114.4900      10.4       179       134        72
WVCT   2025250     91400   19.4300 -114.6400      12.0       164       140        87
WVCT   2025250     91400   19.3900 -114.7900       9.9       152       157       100
WVCT   2025250     91400   19.4000 -114.8900       4.3       131       158        97
WVCT   2025250     91400   19.3900 -115.2400       8.9       165       197        95
WVCT   2025250     91400   19.4300 -115.3200      11.3       164       195        86
WVCT   2025250     91400   19.3900 -115.4200      11.9       159       176       100
WVCT   2025250     91400   19.4300 -115.4800      12.6       159       178        97
WVCT   2025250     91400   19.4200 -115.5900      11.0       168       185        85
WVCT   2025250     91400   19.3400 -115.7800       7.9       182       169        99
WVCT   2025250     91400   19.3900 -115.8600       6.6       184       159        99
WVCT   2025250     91400   19.3300 -115.9600       5.5       162       155        99
WVCT   2025250     91400   19.3300 -116.0800       5.8       149       154       100
WVCT   2025250     91400   19.3300 -116.1900       5.6       154       150        96
WVCT   2025250     91400   19.3400 -116.3400       4.7       166       154        80
WVCT   2025250     91400   19.3700 -116.6000       5.1       184       183        83
WVCT   2025250     91400   19.3000 -117.0300       5.5       150       174        88
WVCT   2025250     91400   19.2700 -118.1500       6.1        29       167        97
WVCT   2025250     91400   19.2700 -118.3300       7.2        41       176        95
WVCT   2025250     91400   19.3300 -118.3800       4.4        57       178        80
WVCT   2025250     91400   19.2800 -118.5000       5.9       358       172        65
WVCT   2025250     91400   19.2600 -118.6500       8.1        39       166        80
WVCT   2025250     91400   19.3200 -118.7300      10.5        29       163        96
WVCT   2025250     91400   19.2500 -118.8900      10.3        15       154        99
WVCT   2025250     91400   19.3300 -119.0500      13.2         9       173        75
WVCT   2025250     91400   19.4700 -108.4700       7.7        94       176        93
WVCT   2025250     91400   19.4600 -108.6000       7.9       108       167        91
WVCT   2025250     91400   19.4800 -108.6900       7.3       111       165        95
WVCT   2025250     91400   19.5000 -108.7600       6.8       112       162        94
WVCT   2025250     91400   19.4500 -109.0000       8.5        85       169        89
WVCT   2025250     91400   19.4900 -109.0800       8.4        74       178        84
WVCT   2025250     91400   19.4400 -109.1400       8.7        67       176        79
WVCT   2025250     91400   19.5200 -109.3500       5.9        21       199        89
WVCT   2025250     91400   19.5200 -109.3700       5.7        23       199        92
WVCT   2025250     91400   19.4300 -109.5400       5.6        37       182        98
WVCT   2025250     91400   19.5100 -109.7200       4.8        34       173        84
WVCT   2025250     91400   19.4100 -110.0500       9.2        96       169        85
WVCT   2025250     91400   19.4100 -110.1800       8.9        92       168        82
WVCT   2025250     91400   19.4000 -110.3500       8.2       108       163        74
WVCT   2025250     91400   19.4600 -110.5700       7.4        71       202        91
WVCT   2025250     91400   19.4500 -110.7000       9.1        96       207        99
WVCT   2025250     91400   19.4000 -111.1200       5.7        64       161       100
WVCT   2025250     91400   19.3700 -111.2400       5.7        94       159        99
WVCT   2025250     91400   19.4400 -111.6500       7.8        77       154        91
WVCT   2025250     91400   19.4000 -111.7100      11.0        91       154        68
WVCT   2025250     91400   19.3800 -111.8100      11.9       100       154        75
WVCT   2025250     91400   19.3500 -112.0300       7.2       117       153        75
WVCT   2025250     91400   19.3700 -112.1400       6.9       113       154        91
WVCT   2025250     91400   19.3400 -112.1900       6.7       118       155        90
WVCT   2025250     91400   19.4000 -112.3400       7.3       133       158       100
WVCT   2025250     91400   19.3400 -112.4000       6.2       131       157        95
WVCT   2025250     91400   19.4000 -113.0200       4.6       188       131        82
WVCT   2025250     91400   19.3100 -113.2500       5.4       227       113        72
WVCT   2025250     91400   19.2900 -114.0600      19.2        55       119        73
WVCT   2025250     91400   19.2900 -114.5500      11.6       172       140        99
WVCT   2025250     91400   19.3300 -114.6800      12.1       165       149        98
WVCT   2025250     91400   19.3500 -114.7000      12.0       163       150        97
WVCT   2025250     91400   19.2600 -114.8300       9.7       158       161        69
WVCT   2025250     91400   19.3200 -115.1200       5.0       176       197       100
WVCT   2025250     91400   19.2700 -115.1700       7.3       166       199        95
WVCT   2025250     91400   19.2500 -115.3500       8.3       160       175        94
WVCT   2025250     91400   19.2900 -115.4600      10.2       157       175        99
WVCT   2025250     91400   19.2600 -115.5100      10.4       155       176        95
WVCT   2025250     91400   19.3000 -115.7000       9.2       169       175        99
WVCT   2025250     91400   19.3200 -115.7900       8.2       180       169        98
WVCT   2025250     91400   19.2900 -115.8800       7.4       174       162        98
WVCT   2025250     91400   19.2900 -115.9500       6.0       167       158        92
WVCT   2025250     91400   19.2900 -116.1100       5.3       142       153        98
WVCT   2025250     91400   19.3100 -116.1700       5.4       146       148        98
WVCT   2025250     91400   19.2400 -116.2900       5.1       133       155        92
WVCT   2025250     91400   19.2900 -116.7900       4.7       210       179        94
WVCT   2025250     91400   19.2900 -116.8800       6.0       180       178        92
WVCT   2025250     91400   19.2800 -117.0100       8.0       154       175        96
WVCT   2025250     91400   19.2000 -117.1400       4.4       179       172        91
WVCT   2025250     91400   19.2400 -118.0300       5.8         5       163        98
WVCT   2025250     91400   19.2300 -118.0900       5.9        20       165        96
WVCT   2025250     91400   19.1900 -118.1700       7.4        22       167        89
WVCT   2025250     91400   19.2500 -118.3300       8.1        38       176        95
WVCT   2025250     91400   19.1900 -118.3800       8.4        35       181        91
WVCT   2025250     91400   19.1800 -118.5400       4.2        12       172        72
WVCT   2025250     91400   19.2400 -118.6600       7.8        36       168        71
WVCT   2025250     91400   19.2400 -118.8500      10.5        22       157        81
WVCT   2025250     91400   19.1900 -118.9400       9.8        19       155       100
WVCT   2025250     91400   19.2100 -119.0500      10.6        17       155        95
WVCT   2025250     91400   19.2300 -119.2000      13.3        18       182        73
WVCT   2025250     91400   19.4100 -108.4100       7.1        90       183        92
WVCT   2025250     91400   19.4400 -108.6000       7.6       112       167        89
WVCT   2025250     91400   19.3800 -108.7200       6.8       124       161        77
WVCT   2025250     91400   19.3500 -108.8700       7.7       102       158        60
WVCT   2025250     91400   19.4300 -109.0000       9.2        91       168        92
WVCT   2025250     91400   19.4300 -109.0300       8.9        86       171        94
WVCT   2025250     91400   19.4200 -109.1500       8.6        72       174        89
WVCT   2025250     91400   19.4200 -109.3700       6.6        26       190        85
WVCT   2025250     91400   19.3700 -109.4800       5.3        22       190        96
WVCT   2025250     91400   19.3500 -109.6300       4.3        17       171        70
WVCT   2025250     91400   19.3200 -109.8800       4.3        87       169        78
WVCT   2025250     91400   19.3100 -110.0100       7.6        89       167        94
WVCT   2025250     91400   19.3900 -110.0600       8.8        96       169        83
WVCT   2025250     91400   19.3500 -110.1900       7.6        87       165        79
WVCT   2025250     91400   19.3000 -110.3700      11.4       106       161        91
WVCT   2025250     91400   19.3000 -110.4500      11.9       102       158        91
WVCT   2025250     91400   19.3800 -110.5700       7.8        82       160       100
WVCT   2025250     91400   19.3300 -110.7300       6.4        85       190        96
WVCT   2025250     91400   19.2800 -111.0700       6.8        92       143        85
WVCT   2025250     91400   19.3600 -111.2000       6.0        88       158        97
WVCT   2025250     91400   19.3300 -111.2300       6.3       109       154        95
WVCT   2025250     91400   19.2500 -111.8100       9.5       101       155        65
WVCT   2025250     91400   19.2500 -111.9100       8.7       121       156        79
WVCT   2025250     91400   19.2500 -111.9800       6.7       112       155        94
WVCT   2025250     91400   19.2400 -112.1400       6.9       110       155       100
WVCT   2025250     91400   19.2400 -112.2900       6.0       118       157       100
WVCT   2025250     91400   19.3200 -112.3100       6.0       127       155        97
WVCT   2025250     91400   19.3200 -112.4100       5.7       131       157        93
WVCT   2025250     91400   19.2300 -112.5900       4.3       126       148        94
WVCT   2025250     91400   19.2600 -112.8600       5.0       172       141        64
WVCT   2025250     91400   19.2300 -113.1200       7.5       208       123        98
WVCT   2025250     91400   19.2900 -113.2300       6.1       223       114        99
WVCT   2025250     91400   19.2100 -114.0700      19.2        55       119        82
WVCT   2025250     91400   19.1800 -114.2600      12.8       158       140        60
WVCT   2025250     91400   19.2500 -114.4500      12.7       173       139        72
WVCT   2025250     91400   19.2300 -114.5400      11.1       169       143        99
WVCT   2025250     91400   19.2500 -114.6800      11.7       165       148        99
WVCT   2025250     91400   19.2400 -114.7900      11.2       160       160        86
WVCT   2025250     91400   19.1800 -114.8500       9.4       160       165        82
WVCT   2025250     91400   19.1600 -115.0300       7.5       166       198       100
WVCT   2025250     91400   19.1900 -115.1600       8.6       165       201       100
WVCT   2025250     91400   19.1900 -115.1800       8.3       165       202       100
WVCT   2025250     91400   19.2300 -115.3600       8.3       161       175        97
WVCT   2025250     91400   19.1500 -115.4400       8.0       160       175        99
WVCT   2025250     91400   19.1400 -115.6200       8.0       165       178        98
WVCT   2025250     91400   19.1600 -115.6400       8.5       165       181        98
WVCT   2025250     91400   19.2100 -115.8300       8.5       174       171        96
WVCT   2025250     91400   19.1700 -115.8600       7.7       175       171        93
WVCT   2025250     91400   19.1500 -116.0200       4.7       175       152        79
WVCT   2025250     91400   19.1500 -116.1800       6.0       142       144        85
WVCT   2025250     91400   19.1800 -116.2400       5.8       130       148        97
WVCT   2025250     91400   19.1900 -116.7200       6.0       268       180        81
WVCT   2025250     91400   19.1700 -116.7500       6.3       268       179        89
WVCT   2025250     91400   19.1900 -116.8600       5.2       240       180        80
WVCT   2025250     91400   19.1800 -117.1400       4.1       180       172        92
WVCT   2025250     91400   19.1400 -117.9400       5.1        20       176        99
WVCT   2025250     91400   19.1200 -117.9600       5.2        32       172       100
WVCT   2025250     91400   19.1300 -118.1500       5.7        27       167        65
WVCT   2025250     91400   19.1300 -118.1800       6.4        27       167        65
WVCT   2025250     91400   19.0700 -118.3800       7.4        43       174        88
WVCT   2025250     91400   19.0900 -118.4000       7.3        45       178        81
WVCT   2025250     91400   19.1000 -118.5700       4.3        18       171        69
WVCT   2025250     91400   19.0600 -118.7100       9.5        13       169        95
WVCT   2025250     91400   19.0600 -118.7300       9.9        14       168        98
WVCT   2025250     91400   19.0900 -118.9000      11.6        17       158        98
WVCT   2025250     91400   19.1100 -118.9400      11.3        19       157       100
WVCT   2025250     91400   19.1300 -119.0800      10.8        37       155        94
WVCT   2025250     91400   19.0700 -119.1600      11.4        42       161        98
WVCT   2025250     91400   19.3300 -108.4300       6.2        87       180       100
WVCT   2025250     91400   19.3000 -108.6600       6.6       120       166        85
WVCT   2025250     91400   19.3400 -108.7000       6.4       124       162        76
WVCT   2025250     91400   19.3300 -108.8800       7.8       102       158        62
WVCT   2025250     91400   19.2500 -109.0000       8.3        95       167        97
WVCT   2025250     91400   19.3300 -109.0500      10.1        94       172        98
WVCT   2025250     91400   19.2800 -109.2100       9.8        86       175        94
WVCT   2025250     91400   19.2700 -109.4100       5.5        40       191        95
WVCT   2025250     91400   19.2900 -109.4800       4.2        14       190        96
WVCT   2025250     91400   19.2200 -109.9100       6.0        97       167       100
WVCT   2025250     91400   19.2100 -110.0300       8.3        87       163        89
WVCT   2025250     91400   19.2300 -110.0500       8.0        84       163        93
WVCT   2025250     91400   19.2700 -110.2100       8.1        87       163        92
WVCT   2025250     91400   19.2000 -110.4000      13.1       101       156        92
WVCT   2025250     91400   19.2200 -110.4200      13.0       102       157        88
WVCT   2025250     91400   19.2300 -110.6300      10.7       109       158        88
WVCT   2025250     91400   19.2300 -110.6500      10.2       110       159        93
WVCT   2025250     91400   19.2700 -110.8600       4.0        52       154        70
WVCT   2025250     91400   19.2000 -111.0000       6.8        11       149        77
WVCT   2025250     91400   19.1800 -111.0200       6.3        79       149        98
WVCT   2025250     91400   19.1700 -111.2400       8.7       122       152        97
WVCT   2025250     91400   19.1900 -111.2600       8.0       123       153       100
WVCT   2025250     91400   19.1700 -111.3800       4.5       125       148        80
WVCT   2025250     91400   19.2200 -111.7300       9.2        93       150        60
WVCT   2025250     91400   19.1900 -111.9200       7.2       109       157        95
WVCT   2025250     91400   19.1500 -112.0500       6.4       115       156        99
WVCT   2025250     91400   19.2000 -112.1800       6.4       110       156       100
WVCT   2025250     91400   19.2000 -112.2000       6.3       111       156       100
WVCT   2025250     91400   19.2000 -112.3700       4.8       123       163        97
WVCT   2025250     91400   19.1900 -112.4400       4.5       127       163        94
WVCT   2025250     91400   19.2100 -112.5700       4.3       126       149        93
WVCT   2025250     91400   19.1300 -112.7300       5.5       143       149        99
WVCT   2025250     91400   19.2000 -112.8300       5.0       163       145        75
WVCT   2025250     91400   19.1200 -113.0300       9.8       189       134        63
WVCT   2025250     91400   19.1100 -113.2000      10.6       184       122       100
WVCT   2025250     91400   19.1000 -113.4100       8.1       186       109        75
WVCT   2025250     91400   19.1000 -114.1200      18.3       202       131        99
WVCT   2025250     91400   19.0800 -114.1900      18.7       197       142        77
WVCT   2025250     91400   19.0800 -114.3000      15.8       164       144        95
WVCT   2025250     91400   19.0700 -114.4200      14.7       158       146        72
WVCT   2025250     91400   19.1500 -114.5800       8.8       168       146        73
WVCT   2025250     91400   19.1300 -114.7000       8.4       167       150        85
WVCT   2025250     91400   19.0800 -114.8000       6.8       169       164        90
WVCT   2025250     91400   19.1000 -114.8600       6.4       164       167        99
WVCT   2025250     91400   19.1200 -114.9700       5.9       163       168        89
WVCT   2025250     91400   19.0900 -115.1800       6.8       177       205        96
WVCT   2025250     91400   19.0500 -115.2800       7.1       175       205        92
WVCT   2025250     91400   19.1300 -115.3300       7.7       165       204       100
WVCT   2025250     91400   19.0900 -115.4300       8.2       165       175        99
WVCT   2025250     91400   19.0400 -115.6200       7.2       166       175        86
WVCT   2025250     91400   19.1200 -115.6700       8.3       171       182       100
WVCT   2025250     91400   19.0900 -115.8500       7.9       181       172        84
WVCT   2025250     91400   19.0500 -115.9700       5.9       189       164        91
WVCT   2025250     91400   19.1100 -116.0100       5.2       184       156        86
WVCT   2025250     91400   19.0300 -116.1300       6.4       169       153        80
WVCT   2025250     91400   19.0400 -116.2400       6.5       155       154        89
WVCT   2025250     91400   19.0100 -116.7600       6.6       283       171        79
WVCT   2025250     91400   19.0100 -116.8700       8.5       279       172        96
WVCT   2025250     91400   19.0800 -116.9600       5.1       288       175        91
WVCT   2025250     91400   18.9800 -117.7700       4.2        15       205        94
WVCT   2025250     91400   19.0400 -117.9100       5.5        41       186        98
WVCT   2025250     91400   19.0400 -118.0000       5.7        36       170        98
WVCT   2025250     91400   19.0500 -118.3600       6.7        44       173        99
WVCT   2025250     91400   19.0000 -118.4600       5.5        38       177        97
WVCT   2025250     91400   19.0400 -118.5800       5.3        16       172        98
WVCT   2025250     91400   19.0400 -118.7100       9.8        11       169        96
WVCT   2025250     91400   19.0100 -118.9300      12.8        14       161       100
WVCT   2025250     91400   18.9700 -119.0000      13.0        19       163        98
WVCT   2025250     91400   18.9900 -119.0600      13.2        28       163        94
WVCT   2025250     91400   19.2400 -108.5600       5.2        98       181        98
WVCT   2025250     91400   19.2400 -108.6800       5.4       110       168        84
WVCT   2025250     91400   19.1900 -108.7700       5.8       109       165        70
WVCT   2025250     91400   19.1900 -108.9100       7.5       106       164        99
WVCT   2025250     91400   19.2000 -109.0600       8.2        92       172       100
WVCT   2025250     91400   19.1800 -109.0900       8.0        93       174        99
WVCT   2025250     91400   19.2200 -109.2000       8.5        92       178        98
WVCT   2025250     91400   19.1500 -109.3400       6.6        90       193        86
WVCT   2025250     91400   19.1500 -109.5400       4.6        33       192       100
WVCT   2025250     91400   19.1500 -109.5900       4.5        33       189        96
WVCT   2025250     91400   19.2000 -109.9200       6.2       100       167        99
WVCT   2025250     91400   19.1100 -109.9600       6.7       101       165        74
WVCT   2025250     91400   19.1300 -110.0800       8.1        84       161        74
WVCT   2025250     91400   19.1600 -110.2400       9.1        88       157        99
WVCT   2025250     91400   19.1600 -110.3300      11.1        95       158        97
WVCT   2025250     91400   19.1000 -110.4900      12.6        98       153        99
WVCT   2025250     91400   19.0900 -110.7100      10.3       112       189       100
WVCT   2025250     91400   19.0800 -110.8800       4.4        85       196        75
WVCT   2025250     91400   19.1400 -111.0100       5.7        69       166        97
WVCT   2025250     91400   19.1000 -111.0700       6.3        70       159        70
WVCT   2025250     91400   19.1500 -111.2400       8.5       119       152        95
WVCT   2025250     91400   19.1500 -111.3600       5.6       125       151        84
WVCT   2025250     91400   19.0600 -111.5000       7.2       105       134        95
WVCT   2025250     91400   19.0600 -111.5500       7.0       100       134        96
WVCT   2025250     91400   19.0600 -111.7400       7.6        86       145        77
WVCT   2025250     91400   19.0700 -111.7800       8.3        76       149        62
WVCT   2025250     91400   19.0900 -111.8700       8.4        91       155        71
WVCT   2025250     91400   19.1300 -112.0500       6.5       115       156       100
WVCT   2025250     91400   19.1000 -112.1300       5.9       113       158       100
WVCT   2025250     91400   19.0600 -112.2600       5.3       112       163       100
WVCT   2025250     91400   19.0400 -112.3500       5.7       125       167       100
WVCT   2025250     91400   19.0300 -112.5000       6.4       128       167       100
WVCT   2025250     91400   19.0300 -112.6800       7.5       145       151       100
WVCT   2025250     91400   19.0300 -112.7100       7.3       147       151       100
WVCT   2025250     91400   19.0600 -112.9100       7.5       176       145        83
WVCT   2025250     91400   19.0200 -113.0100       8.9       183       140        91
WVCT   2025250     91400   19.0900 -113.1100      10.7       187       129        71
WVCT   2025250     91400   19.0900 -113.2000      11.1       182       122        98
WVCT   2025250     91400   19.0100 -113.3100      11.9       174       119        86
WVCT   2025250     91400   19.0800 -113.4800      12.4       163       110        85
WVCT   2025250     91400   19.0200 -113.5400      12.7       161       112        95
WVCT   2025250     91400   19.0300 -113.7200      16.3       159       116        78
WVCT   2025250     91400   19.0000 -114.0700       7.4       187       132       100
WVCT   2025250     91400   19.0600 -114.3100      15.7       164       145        99
WVCT   2025250     91400   18.9700 -114.5300       7.6       185       147        75
WVCT   2025250     91400   18.9700 -114.6000       7.0       194       147        71
WVCT   2025250     91400   19.0400 -114.8300       6.2       174       167        86
WVCT   2025250     91400   19.0400 -114.9000       5.0       174       167        94
WVCT   2025250     91400   19.0300 -115.1500       4.6       194       206        99
WVCT   2025250     91400   19.0300 -115.2800       7.0       175       205        97
WVCT   2025250     91400   18.9500 -115.4300       7.2       160       173        99
WVCT   2025250     91400   18.9600 -115.4500       7.7       162       172        97
WVCT   2025250     91400   19.0200 -115.6400       7.6       167       175        82
WVCT   2025250     91400   18.9400 -115.6800       6.9       158       174        79
WVCT   2025250     91400   18.9300 -115.8600       6.9       186       172        95
WVCT   2025250     91400   19.0100 -115.9800       6.1       192       165        91
WVCT   2025250     91400   19.0100 -116.0000       5.7       193       164        88
WVCT   2025250     91400   18.9200 -116.2200       4.6       180       162        72
WVCT   2025250     91400   18.9800 -116.2300       5.2       164       159        76
WVCT   2025250     91400   18.9100 -116.7100       5.8       300       169        95
WVCT   2025250     91400   18.9100 -116.8200       9.9       278       170        95
WVCT   2025250     91400   18.9800 -117.2200       4.9       354       170        78
WVCT   2025250     91400   18.8900 -117.4100       4.3        29       173        85
WVCT   2025250     91400   18.9000 -117.7800       6.0         4       203        92
WVCT   2025250     91400   18.9000 -117.9800       6.2        27       184        75
WVCT   2025250     91400   18.9100 -118.0800       7.0         8       164        99
WVCT   2025250     91400   18.8900 -118.3000       4.2        53       170        62
WVCT   2025250     91400   18.8800 -118.5200       7.8         9       177        92
WVCT   2025250     91400   18.9000 -118.5400       8.2         7       177        93
WVCT   2025250     91400   18.9400 -118.8400      12.3         6       166        86
WVCT   2025250     91400   18.8500 -118.9100      13.6        10       167        94
WVCT   2025250     91400   18.8700 -119.0600      13.5        19       167        99
WVCT   2025250     91400   18.8500 -119.1900      13.3        20       167        74
WVCT   2025250     91400   19.0600 -108.6500       5.4       112       170        88
WVCT   2025250     91400   19.1100 -108.8100       5.9       104       166        73
WVCT   2025250     91400   19.1300 -108.9600       7.5       113       167       100
WVCT   2025250     91400   19.1300 -108.9800       7.5       111       169       100
WVCT   2025250     91400   19.0400 -109.2000       7.8        89       181        82
WVCT   2025250     91400   19.0500 -109.3400       7.7        91       193        94
WVCT   2025250     91400   19.0400 -109.5900       5.5        31       194        72
WVCT   2025250     91400   19.0400 -109.6100       5.5        34       193        87
WVCT   2025250     91400   19.1000 -109.8200       4.9        95       168        94
WVCT   2025250     91400   19.0300 -109.9100       5.2        94       168        93
WVCT   2025250     91400   19.0900 -109.9600       6.3       100       165        69
WVCT   2025250     91400   19.0400 -110.1900       7.5        85       156        90
WVCT   2025250     91400   19.0600 -110.3100       9.5        91       154        98
WVCT   2025250     91400   19.0400 -110.4100      11.9        95       144        97
WVCT   2025250     91400   19.0100 -110.4900      12.4        95       146        97
WVCT   2025250     91400   18.9900 -110.6400      12.3        96       153        99
WVCT   2025250     91400   19.0300 -110.7000      10.3       104       184        98
WVCT   2025250     91400   19.0000 -110.8800       6.1        86       167        85
WVCT   2025250     91400   19.0000 -111.0000       5.5        36       170        99
WVCT   2025250     91400   19.0600 -111.0800       5.8        53       166        76
WVCT   2025250     91400   19.0500 -111.2400       7.9       104       156        99
WVCT   2025250     91400   18.9900 -111.4000       8.7       104       135        85
WVCT   2025250     91400   19.0200 -111.4400       9.0       102       135        93
WVCT   2025250     91400   19.0400 -111.6300       7.1       111       136        77
WVCT   2025250     91400   19.0200 -111.6500       7.4       112       138        72
WVCT   2025250     91400   19.0300 -111.7900       7.6        80       148        67
WVCT   2025250     91400   18.9900 -111.9700       6.9       104       157        91
WVCT   2025250     91400   18.9800 -112.0600       7.0       106       159       100
WVCT   2025250     91400   19.0000 -112.1500       6.2       107       161       100
WVCT   2025250     91400   19.0200 -112.3400       5.7       127       165       100
WVCT   2025250     91400   19.0200 -112.3600       5.8       128       166       100
WVCT   2025250     91400   19.0100 -112.5000       6.7       131       164       100
WVCT   2025250     91400   19.0100 -112.6900       7.9       146       151       100
WVCT   2025250     91400   19.0000 -112.7100       7.5       148       151        99
WVCT   2025250     91400   19.0000 -112.8500       5.9       158       148        78
WVCT   2025250     91400   18.9600 -113.0000       6.9       173       143        94
WVCT   2025250     91400   18.9100 -113.1200       5.8       167       137        66
WVCT   2025250     91400   18.9100 -113.3300       7.6       167       125        63
WVCT   2025250     91400   18.9400 -113.4200       8.9       174       116        74
WVCT   2025250     91400   18.9600 -113.5500      10.6       165       116        76
WVCT   2025250     91400   18.9200 -113.6700      11.2       162       120        68
WVCT   2025250     91400   18.9300 -113.8100      12.5       172       121        78
WVCT   2025250     91400   18.9000 -114.0700       6.6       183       134        68
WVCT   2025250     91400   18.8900 -114.4300       8.5       177       149        99
WVCT   2025250     91400   18.9100 -114.5400       7.6       186       148        86
WVCT   2025250     91400   18.8900 -114.6100       8.1       188       150        86
WVCT   2025250     91400   18.8600 -114.7800       6.8       178       159        90
WVCT   2025250     91400   18.9000 -114.8800       4.1       190       169        72
WVCT   2025250     91400   18.8500 -115.1600       5.0       184       180        97
WVCT   2025250     91400   18.8500 -115.3200       4.5       166       180        99
WVCT   2025250     91400   18.9100 -115.4000       5.2       155       186       100
WVCT   2025250     91400   18.8400 -115.6300       4.8       153       174        86
WVCT   2025250     91400   18.8400 -115.7200       4.0       138       175        88
WVCT   2025250     91400   18.8700 -115.8700       4.8       185       171        93
WVCT   2025250     91400   18.8300 -115.9900       4.8       189       167        95
WVCT   2025250     91400   18.8700 -116.1000       5.0       175       167        77
WVCT   2025250     91400   18.9100 -116.1300       5.3       173       165        75
WVCT   2025250     91400   18.8900 -116.6900       5.3       305       168        88
WVCT   2025250     91400   18.8900 -116.8200      10.2       280       169        91
WVCT   2025250     91400   18.8800 -117.1100       4.6       319       163        98
WVCT   2025250     91400   18.8300 -117.4400       4.8        18       173        67
WVCT   2025250     91400   18.8100 -117.4700       5.0        15       173        64
WVCT   2025250     91400   18.8700 -117.5900       4.7        15       173        99
WVCT   2025250     91400   18.8400 -117.7500       7.9       355       199        93
WVCT   2025250     91400   18.7800 -117.8000       7.8       357       199        98
WVCT   2025250     91400   18.7800 -118.0000       6.8        21       186        88
WVCT   2025250     91400   18.7800 -118.0400       7.6        15       185        90
WVCT   2025250     91400   18.7700 -118.1300       6.1        25       182        96
WVCT   2025250     91400   18.7900 -118.3200       6.0        89       170        72
WVCT   2025250     91400   18.8100 -118.3400       5.6        79       171        65
WVCT   2025250     91400   18.8000 -118.5300       8.1       359       167        97
WVCT   2025250     91400   18.7600 -118.7800      12.1       354       171        99
WVCT   2025250     91400   18.8300 -118.9400      14.1        11       168        97
WVCT   2025250     91400   18.8300 -119.0000      14.3        15       167        99
WVCT   2025250     91400   18.8300 -119.1700      13.1        21       168        75
WVCT   2025250     91400   18.7500 -119.2700      11.8        10       176        60
WVCT   2025250     91400   19.0200 -108.6100       4.6       105       170        88
WVCT   2025250     91400   19.0400 -108.6300       5.0       113       171        93
WVCT   2025250     91400   18.9900 -108.8200       6.8        93       170        76
WVCT   2025250     91400   18.9400 -109.0000       8.2        63       173        75
WVCT   2025250     91400   19.0000 -109.0100       6.6        87       175        67
WVCT   2025250     91400   19.0200 -109.2000       8.5        87       181        81
WVCT   2025250     91400   18.9900 -109.2600      10.8        88       182        84
WVCT   2025250     91400   19.0100 -109.4300       6.2        76       194        92
WVCT   2025250     91400   18.9200 -109.5900       4.1        39       213        63
WVCT   2025250     91400   19.0000 -109.6700       5.6        39       191        89
WVCT   2025250     91400   18.9300 -109.8600       5.3        67       187        72
WVCT   2025250     91400   18.9700 -109.9200       4.7        74       167        75
WVCT   2025250     91400   18.9100 -110.0100       4.8        44       168        94
WVCT   2025250     91400   18.9200 -110.2200       5.7        70       156        98
WVCT   2025250     91400   18.9000 -110.3300       6.9        67       149       100
WVCT   2025250     91400   18.9400 -110.4100      10.1        86       143        84
WVCT   2025250     91400   18.9300 -110.6100      14.3       100       146        95
WVCT   2025250     91400   18.8800 -110.8300      11.0        72       152        93
WVCT   2025250     91400   18.9000 -110.9500       7.9        66       160        91
WVCT   2025250     91400   18.9000 -111.0000       6.1        69       161        89
WVCT   2025250     91400   18.9300 -111.1100       5.7        59       164        97
WVCT   2025250     91400   18.9100 -111.3000       8.1        98       154        97
WVCT   2025250     91400   18.9300 -111.3200       8.0       100       153        99
WVCT   2025250     91400   18.9400 -111.4800       8.8       101       122        86
WVCT   2025250     91400   18.9000 -111.6100       7.1       110       126        69
WVCT   2025250     91400   18.9400 -111.6700       7.1       106       131        67
WVCT   2025250     91400   18.9300 -111.8900       7.2        92       150        99
WVCT   2025250     91400   18.8900 -112.0100       7.3       116       158        86
WVCT   2025250     91400   18.8600 -112.1100       7.3       125       159        97
WVCT   2025250     91400   18.8400 -112.1600       7.8       135       159        98
WVCT   2025250     91400   18.8600 -112.3000       7.2       134       163       100
WVCT   2025250     91400   18.8900 -112.4800       7.1       130       161        98
WVCT   2025250     91400   18.8500 -112.5100       7.4       135       161        96
WVCT   2025250     91400   18.8700 -112.6500       8.1       143       154        98
WVCT   2025250     91400   18.8200 -112.8000       4.3       147       157        93
WVCT   2025250     91400   18.8800 -112.9200       4.4       138       150        90
WVCT   2025250     91400   18.8100 -113.0500       6.5       117       150        98
WVCT   2025250     91400   18.8100 -113.1900       5.2       141       142        90
WVCT   2025250     91400   18.8500 -113.3000       5.4       154       132        68
WVCT   2025250     91400   18.8000 -113.4200       6.4       136       133        99
WVCT   2025250     91400   18.8000 -113.4700       6.6       137       133        99
WVCT   2025250     91400   18.8800 -113.5700       8.3       163       124        71
WVCT   2025250     91400   18.8200 -113.6700       8.8       168       130        72
WVCT   2025250     91400   18.8100 -113.8600       7.8       172       132        87
WVCT   2025250     91400   18.7900 -113.9100       6.3       176       133        94
WVCT   2025250     91400   18.7800 -114.0900       5.2       185       139        98
WVCT   2025250     91400   18.7800 -114.1800       6.2       178       146       100
WVCT   2025250     91400   18.8000 -114.2700       7.0       180       150        99
WVCT   2025250     91400   18.8500 -114.4400       8.7       175       151        99
WVCT   2025250     91400   18.8300 -114.5600       8.7       178       151        91
WVCT   2025250     91400   18.8500 -114.5800       8.6       181       150        88
WVCT   2025250     91400   18.8000 -114.7900       5.7       182       165        95
WVCT   2025250     91400   18.7600 -114.8200       4.4       191       168        88
WVCT   2025250     91400   18.7500 -115.1100       4.0       191       179        97
WVCT   2025250     91400   18.8300 -115.1600       5.2       180       180        97
WVCT   2025250     91400   18.8300 -115.3200       4.0       164       180        95
WVCT   2025250     91400   18.8200 -115.6100       4.3       153       174        81
WVCT   2025250     91400   18.8100 -116.0000       4.4       188       167        93
WVCT   2025250     91400   18.8100 -116.0800       4.8       171       169        71
WVCT   2025250     91400   18.8100 -116.1500       5.0       172       170        66
WVCT   2025250     91400   18.8000 -116.3300       4.0       217       167        91
WVCT   2025250     91400   18.7400 -117.1100       4.4       131       168        82
WVCT   2025250     91400   18.6900 -117.4700       5.1        36       171        93
WVCT   2025250     91400   18.6900 -117.5300       5.9        14       173        98
WVCT   2025250     91400   18.6900 -117.6700       8.4       351       189        99
WVCT   2025250     91400   18.7600 -117.7600       8.4       352       196        95
WVCT   2025250     91400   18.7200 -117.9000       6.6        25       187        97
WVCT   2025250     91400   18.7600 -117.9800       6.6        22       185        90
WVCT   2025250     91400   18.7400 -118.0700       7.6        13       184        91
WVCT   2025250     91400   18.7300 -118.2200       6.3        60       172        96
WVCT   2025250     91400   18.7100 -118.3300       5.2        65       169        99
WVCT   2025250     91400   18.7300 -118.4400       5.2        11       166        96
WVCT   2025250     91400   18.7100 -118.4600       7.0         0       166        99
WVCT   2025250     91400   18.7400 -118.7400      11.7       353       169        99
WVCT   2025250     91400   18.7400 -118.8000      12.5       358       170        99
WVCT   2025250     91400   18.7100 -119.1900      13.4        20       173        62
WVCT   2025250     91400   18.9000 -108.5700       5.0        46       175        69
WVCT   2025250     91400   18.8500 -108.7800       5.7        85       171        81
WVCT   2025250     91400   18.8700 -108.8000       6.1        89       170        79
WVCT   2025250     91400   18.9200 -109.0100       9.1        59       173        79
WVCT   2025250     91400   18.9000 -109.0400      10.1        55       175        83
WVCT   2025250     91400   18.9000 -109.2100      12.6        69       184        98
WVCT   2025250     91400   18.9100 -109.2800      14.3        81       183        96
WVCT   2025250     91400   18.8200 -109.5200       6.6        79       214        99
WVCT   2025250     91400   18.8200 -109.5500       6.3        76       211       100
WVCT   2025250     91400   18.8200 -109.7200       6.0        74       168        93
WVCT   2025250     91400   18.8900 -109.8700       5.5        66       191        95
WVCT   2025250     91400   18.8100 -109.9400       5.9        37       192        98
WVCT   2025250     91400   18.8900 -110.0100       5.1        36       173        99
WVCT   2025250     91400   18.8400 -110.1900       5.7        45       159        60
WVCT   2025250     91400   18.8300 -110.4800       9.4        71       135        74
WVCT   2025250     91400   18.7800 -110.8600      11.1        73       149        90
WVCT   2025250     91400   18.8000 -110.9700       9.0        66       154        64
WVCT   2025250     91400   18.8600 -110.9800       7.6        66       156        84
WVCT   2025250     91400   18.8300 -111.2000       6.5        82       159       100
WVCT   2025250     91400   18.8300 -111.2500       7.2        89       158        98
WVCT   2025250     91400   18.7600 -111.4100       9.6        95       138       100
WVCT   2025250     91400   18.7600 -111.5500       8.2        89       135        99
WVCT   2025250     91400   18.8400 -111.6700       5.1        87       139        62
WVCT   2025250     91400   18.8400 -111.7000       5.1        87       140        64
WVCT   2025250     91400   18.7500 -111.9000       7.5        91       151        69
WVCT   2025250     91400   18.7600 -112.0400       8.0       126       160        81
WVCT   2025250     91400   18.7600 -112.1600       9.0       145       158        99
WVCT   2025250     91400   18.7800 -112.1800       9.2       145       158        99
WVCT   2025250     91400   18.8200 -112.2900       7.7       138       161       100
WVCT   2025250     91400   18.7700 -112.4400       7.1       133       164        99
WVCT   2025250     91400   18.7700 -112.5500       5.7       132       163       100
WVCT   2025250     91400   18.7700 -112.6500       4.8       141       161        99
WVCT   2025250     91400   18.8000 -112.8000       4.1       147       157        95
WVCT   2025250     91400   18.7600 -112.9500       6.0       102       156        94
WVCT   2025250     91400   18.7900 -113.0100       6.3       110       154        99
WVCT   2025250     91400   18.7500 -113.1600       6.1       127       147       100
WVCT   2025250     91400   18.7700 -113.2700       5.1       143       140        96
WVCT   2025250     91400   18.7200 -113.3700       5.5       141       139       100
WVCT   2025250     91400   18.7000 -113.5100       6.2       144       136        97
WVCT   2025250     91400   18.7000 -113.6300       7.2       161       134        98
WVCT   2025250     91400   18.7300 -113.7800       9.3       173       139        97
WVCT   2025250     91400   18.7500 -113.8900       7.0       173       146        95
WVCT   2025250     91400   18.7500 -114.0100       4.8       173       142        98
WVCT   2025250     91400   18.7200 -114.0300       4.6       177       151        99
WVCT   2025250     91400   18.7200 -114.1500       5.1       175       146        97
WVCT   2025250     91400   18.7600 -114.3000       7.4       180       150       100
WVCT   2025250     91400   18.6700 -114.4300       5.8       186       149        94
WVCT   2025250     91400   18.7100 -114.5400       5.4       177       154        87
WVCT   2025250     91400   18.6700 -114.6600       4.6       184       158        75
WVCT   2025250     91400   18.7000 -114.7600       4.7       184       166        80
WVCT   2025250     91400   18.6700 -115.1100       4.0       200       179        95
WVCT   2025250     91400   18.6700 -115.1700       4.0       192       189        80
WVCT   2025250     91400   18.7100 -116.0800       5.5       186       171        67
WVCT   2025250     91400   18.6500 -117.4800       5.6        41       172       100
WVCT   2025250     91400   18.6500 -117.5000       5.7        33       173        99
WVCT   2025250     91400   18.6500 -117.6100       7.4       358       189        94
WVCT   2025250     91400   18.5800 -117.7900       7.0         6       190        99
WVCT   2025250     91400   18.6400 -117.8900       6.3        31       187        95
WVCT   2025250     91400   18.6600 -118.0200       6.3        20       182        93
WVCT   2025250     91400   18.5700 -118.1200       5.5         7       174        92
WVCT   2025250     91400   18.6300 -118.2400       5.8        32       172        97
WVCT   2025250     91400   18.5900 -118.2900       6.5        23       167        98
WVCT   2025250     91400   18.6100 -118.3700       6.4        20       166        94
WVCT   2025250     91400   18.5600 -118.5700      12.0       353       171        87
WVCT   2025250     91400   18.5600 -118.5900      12.5       349       170        98
WVCT   2025250     91400   18.6000 -118.7200      11.1       355       168        98
WVCT   2025250     91400   18.6200 -118.8200      11.6        10       168        91
WVCT   2025250     91400   18.5900 -118.9800      14.3        16       167        99
WVCT   2025250     91400   18.5500 -119.0900      14.3        14       167        79
WVCT   2025250     91400   18.5500 -119.1300      14.0        13       169        70
WVCT   2025250     91400   18.6100 -119.2700      12.9         8       174        62
WVCT   2025250     91400   18.7500 -108.6800       4.7        24       171        77
WVCT   2025250     91400   18.8300 -108.7900       4.9        76       171        74
WVCT   2025250     91400   18.7800 -108.8900       5.6        69       167        75
WVCT   2025250     91400   18.7400 -109.0000       8.5        74       173        98
WVCT   2025250     91400   18.7400 -109.0800       9.4        77       184        91
WVCT   2025250     91400   18.7300 -109.2000       8.4        85       186        90
WVCT   2025250     91400   18.7300 -109.4000       7.3        69       207        89
WVCT   2025250     91400   18.7200 -109.5500       8.4        76       207       100
WVCT   2025250     91400   18.7200 -109.6200       8.6        81       202        99
WVCT   2025250     91400   18.7400 -109.7100       7.3        77       191        96
WVCT   2025250     91400   18.7500 -109.9000       6.1        35       194        81
WVCT   2025250     91400   18.7900 -109.9400       6.2        36       192        95
WVCT   2025250     91400   18.7600 -110.1400       7.2        22       162        67
WVCT   2025250     91400   18.7800 -110.2300       5.7        50       157        97
WVCT   2025250     91400   18.7000 -110.3700       7.9        44       147        63
WVCT   2025250     91400   18.7100 -110.4400       7.4        75       135        70
WVCT   2025250     91400   18.7500 -110.6000      14.3       108       134        98
WVCT   2025250     91400   18.7600 -110.8600      11.0        76       149        85
WVCT   2025250     91400   18.7200 -110.8900      11.0        82       150        74
WVCT   2025250     91400   18.7500 -111.1700       6.5        83       156        90
WVCT   2025250     91400   18.7300 -111.3400      10.4        96       147        97
WVCT   2025250     91400   18.7200 -111.3700      10.8        96       145        99
WVCT   2025250     91400   18.7400 -111.5300       9.5        90       137       100
WVCT   2025250     91400   18.6500 -111.9500       5.3       101       158        68
WVCT   2025250     91400   18.6700 -111.9700       5.7       105       159        65
WVCT   2025250     91400   18.6600 -112.1600       8.0       137       158        99
WVCT   2025250     91400   18.6400 -112.2100       8.1       135       157        99
WVCT   2025250     91400   18.6800 -112.9900       6.2       107       159        73
WVCT   2025250     91400   18.6300 -113.0400       5.4       119       158        74
WVCT   2025250     91400   18.6100 -113.2300       5.1       154       145        83
WVCT   2025250     91400   18.6100 -113.2600       4.9       154       141        84
WVCT   2025250     91400   18.6200 -113.4600       4.8       160       134        95
WVCT   2025250     91400   18.6800 -113.4900       5.9       146       135        96
WVCT   2025250     91400   18.6400 -113.6400       5.8       172       133        99
WVCT   2025250     91400   18.6300 -113.7800       7.7       182       143        96
WVCT   2025250     91400   18.5900 -113.9000       7.0       177       152        97
WVCT   2025250     91400   18.5800 -114.0400       5.7       178       154        98
WVCT   2025250     91400   18.6600 -114.0500       4.8       177       154        98
WVCT   2025250     91400   18.6200 -114.1700       5.4       174       150        91
WVCT   2025250     91400   18.6300 -114.3700       6.4       190       146        98
WVCT   2025250     91400   18.6500 -114.4800       5.2       179       152        69
WVCT   2025250     91400   18.5700 -114.5400       5.4       180       151        96
WVCT   2025250     91400   18.6100 -114.7100       4.4       188       161       100
WVCT   2025250     91400   18.5600 -115.0400       6.4       201       178        95
WVCT   2025250     91400   18.6300 -115.1100       4.6       201       179        84
WVCT   2025250     91400   18.6300 -115.1800       4.3       195       193        70
WVCT   2025250     91400   18.5600 -115.5300       4.2       178       173        96
WVCT   2025250     91400   18.5300 -117.4500       6.8        46       193        89
WVCT   2025250     91400   18.4900 -117.5900       8.9        11       192       100
WVCT   2025250     91400   18.5400 -117.7100       9.0       354       190        99
WVCT   2025250     91400   18.5600 -117.7900       7.1         4       190        84
WVCT   2025250     91400   18.5300 -118.1200       4.8         1       175        97
WVCT   2025250     91400   18.5300 -118.2500       5.8        17       175        95
WVCT   2025250     91400   18.5500 -118.2900       7.0        17       169        98
WVCT   2025250     91400   18.5500 -118.4200       9.2        10       170        70
WVCT   2025250     91400   18.4800 -118.5900      12.4       360       178        89
WVCT   2025250     91400   18.5400 -118.6000      12.1       354       171        88
WVCT   2025250     91400   18.5400 -118.7700      10.0         4       169        86
WVCT   2025250     91400   18.5400 -118.8100      10.5        11       169        79
WVCT   2025250     91400   18.5300 -118.9400      13.7        17       168        94
WVCT   2025250     91400   18.4500 -119.1100      17.2         3       166        99
WVCT   2025250     91400   18.4500 -119.2600      16.8       358       165        97
WVCT   2025250     91400   18.7300 -108.5900       4.3        28       171        96
WVCT   2025250     91400   18.6500 -108.8100       4.7        59       162        94
WVCT   2025250     91400   18.7300 -108.8600       4.9        69       166        98
WVCT   2025250     91400   18.7200 -109.0300       9.1        78       184        99
WVCT   2025250     91400   18.6500 -109.2000       6.8        89       206        86
WVCT   2025250     91400   18.7100 -109.2100       7.6        89       187        84
WVCT   2025250     91400   18.6300 -109.4500       5.3        70       207        95
WVCT   2025250     91400   18.6400 -109.4700       5.8        69       207       100
WVCT   2025250     91400   18.6400 -109.5900       8.1        79       208        96
WVCT   2025250     91400   18.6400 -109.7400       9.2        81       208        98
WVCT   2025250     91400   18.6500 -109.9000       6.6        63       201        87
WVCT   2025250     91400   18.6900 -110.0400       7.6        26       191        99
WVCT   2025250     91400   18.6400 -110.1000       7.9        32       168        99
WVCT   2025250     91400   18.6000 -110.2800      10.2        57       157        91
WVCT   2025250     91400   18.6000 -110.3200      10.2        53       156        74
WVCT   2025250     91400   18.6100 -110.4600       7.9        79       147        91
WVCT   2025250     91400   18.6700 -110.5700      11.0        98       127        64
WVCT   2025250     91400   18.6000 -110.7300      17.5       110       151        99
WVCT   2025250     91400   18.6600 -110.8800      11.7        96       152        76
WVCT   2025250     91400   18.6600 -110.9100      11.6        95       151        75
WVCT   2025250     91400   18.5700 -111.0500      10.8        94       149        82
WVCT   2025250     91400   18.5900 -111.1600      10.6        98       150        95
WVCT   2025250     91400   18.6300 -111.3400      11.9        94       138        96
WVCT   2025250     91400   18.5800 -111.4900      12.7        91       139        81
WVCT   2025250     91400   18.6400 -111.5000      11.2        85       141        91
WVCT   2025250     91400   18.5600 -111.6400       5.5        89       146        71
WVCT   2025250     91400   18.5400 -112.0700       5.3       102       158        88
WVCT   2025250     91400   18.6200 -112.1900       7.6       132       158        98
WVCT   2025250     91400   18.6200 -112.2100       7.9       132       158        99
WVCT   2025250     91400   18.5300 -112.3500       5.5       105       157        97
WVCT   2025250     91400   18.5900 -113.2100       4.8       159       148        86
WVCT   2025250     91400   18.5900 -113.2600       4.9       160       141        86
WVCT   2025250     91400   18.5800 -113.6500       4.2       179       134       100
WVCT   2025250     91400   18.5300 -113.7300       4.4       188       141        98
WVCT   2025250     91400   18.5300 -113.9100       6.1       177       149        95
WVCT   2025250     91400   18.5400 -114.0200       5.9       178       153       100
WVCT   2025250     91400   18.5400 -114.0900       5.5       178       151       100
WVCT   2025250     91400   18.4800 -114.2400       6.4       182       144       100
WVCT   2025250     91400   18.4800 -114.3100       7.9       188       145        90
WVCT   2025250     91400   18.4700 -114.5100       7.7       177       151        83
WVCT   2025250     91400   18.4700 -114.5400       8.1       174       154        87
WVCT   2025250     91400   18.5000 -114.7300       7.5       171       167       100
WVCT   2025250     91400   18.5000 -114.7600       6.4       168       170       100
WVCT   2025250     91400   18.4600 -115.0800       5.8       203       177        86
WVCT   2025250     91400   18.4700 -115.1000       5.6       204       178        94
WVCT   2025250     91400   18.4900 -116.0500       5.5       334       176        92
WVCT   2025250     91400   18.4100 -116.6000       6.1       331       167        85
WVCT   2025250     91400   18.4100 -116.9500       6.7        10       167        91
WVCT   2025250     91400   18.4300 -117.4700       4.6        43       195        83
WVCT   2025250     91400   18.3900 -117.5400       5.9        25       194        97
WVCT   2025250     91400   18.4600 -117.7200       9.4       354       191        92
WVCT   2025250     91400   18.4600 -117.7500       9.4       352       190        96
WVCT   2025250     91400   18.3800 -118.0600       6.2         8       174        83
WVCT   2025250     91400   18.4000 -118.1300       6.2       358       175        96
WVCT   2025250     91400   18.4300 -118.2700       5.6         9       177        97
WVCT   2025250     91400   18.4300 -118.3800       7.4         6       171        85
WVCT   2025250     91400   18.4500 -118.4000       7.7         6       171        81
WVCT   2025250     91400   18.3700 -118.5200      12.1         4       171        98
WVCT   2025250     91400   18.3600 -118.6900      14.7         4       190        96
WVCT   2025250     91400   18.3600 -118.7800      14.0         9       193        93
WVCT   2025250     91400   18.3600 -118.9100      13.9        11       192       100
WVCT   2025250     91400   18.3500 -119.0100      15.8         4       177        98
WVCT   2025250     91400   18.4100 -119.1300      16.9         2       165        99
WVCT   2025250     91400   18.3900 -119.1600      16.4         1       165        99
WVCT   2025250     91400   18.3500 -119.3100      15.8       358       162        83
WVCT   2025250     91400   18.6300 -108.8400       6.2        69       160        97
WVCT   2025250     91400   18.6200 -108.8900       8.8        77       161        98
WVCT   2025250     91400   18.5300 -109.2000       7.6        56       195        73
WVCT   2025250     91400   18.5500 -109.3000       5.3        44       205        85
WVCT   2025250     91400   18.5300 -109.3700       5.2        62       207        74
WVCT   2025250     91400   18.5200 -109.5900       5.9        93       211        99
WVCT   2025250     91400   18.5600 -109.6600       7.2        81       216        93
WVCT   2025250     91400   18.5300 -109.8300       9.3        86       207        97
WVCT   2025250     91400   18.5100 -109.8600       8.6        85       206        96
WVCT   2025250     91400   18.5000 -110.0800       8.6        63       184        99
WVCT   2025250     91400   18.5400 -110.1500       9.6        48       165        98
WVCT   2025250     91400   18.5800 -110.2800      10.9        56       158        95
WVCT   2025250     91400   18.5800 -110.3300      10.8        54       156        79
WVCT   2025250     91400   18.5400 -110.7700      18.6       110       151        98
WVCT   2025250     91400   18.5200 -110.8700      12.0        97       153        96
WVCT   2025250     91400   18.5100 -111.0400       9.5        83       150        99
WVCT   2025250     91400   18.5100 -111.0800       8.7        74       149        95
WVCT   2025250     91400   18.4900 -111.3300       7.4        93       133        79
WVCT   2025250     91400   18.5000 -111.5100      12.5        94       132        76
WVCT   2025250     91400   18.5000 -111.5800       9.4        96       133        75
WVCT   2025250     91400   18.4500 -111.6900       5.3       113       138        95
WVCT   2025250     91400   18.5200 -112.1600       6.6       107       158        99
WVCT   2025250     91400   18.4800 -112.2900       6.4       114       156        89
WVCT   2025250     91400   18.5100 -112.3500       5.3       106       156        94
WVCT   2025250     91400   18.4200 -114.1800       4.3       186       139        81
WVCT   2025250     91400   18.4200 -114.2300       4.6       185       142        87
WVCT   2025250     91400   18.4600 -114.3400       7.7       191       145        93
WVCT   2025250     91400   18.4300 -114.5200       8.1       176       155        87
WVCT   2025250     91400   18.4500 -114.5400       8.4       172       155        89
WVCT   2025250     91400   18.3800 -114.7600       7.2       160       172        99
WVCT   2025250     91400   18.4000 -114.7800       6.4       159       173       100
WVCT   2025250     91400   18.4200 -114.9700       5.4       197       176        95
WVCT   2025250     91400   18.3900 -115.0900       4.2       216       177        79
WVCT   2025250     91400   18.4300 -115.1100       5.0       206       186        85
WVCT   2025250     91400   18.3500 -116.6500       4.4       327       162        98
WVCT   2025250     91400   18.3700 -116.6700       4.5       328       163       100
WVCT   2025250     91400   18.3100 -116.8600       4.4         6       160        99
WVCT   2025250     91400   18.3900 -116.9500       8.0        14       166        88
WVCT   2025250     91400   18.3600 -117.0200       9.6        14       168        73
WVCT   2025250     91400   18.3500 -117.6400       5.4        43       193        84
WVCT   2025250     91400   18.3500 -117.7400       5.4        31       194        92
WVCT   2025250     91400   18.3200 -117.7700       5.4        38       195        74
WVCT   2025250     91400   18.3200 -118.0300       6.9        25       173        91
WVCT   2025250     91400   18.2900 -118.1900      10.1        17       169        90
WVCT   2025250     91400   18.2700 -118.2100      10.4        18       168        87
WVCT   2025250     91400   18.2700 -118.4000      10.7        11       174        99
WVCT   2025250     91400   18.2900 -118.4900      12.2         5       171       100
WVCT   2025250     91400   18.2800 -118.6200      14.4         1       180       100
WVCT   2025250     91400   18.3300 -119.0400      15.6         3       176        99
WVCT   2025250     91400   18.2700 -119.3500      12.9       359       161        62
WVCT   2025250     91400   18.4900 -108.6700       4.2        63       152        65
WVCT   2025250     91400   18.5300 -108.7600       4.3        63       154        64
WVCT   2025250     91400   18.5200 -108.9600      13.4        76       138        88
WVCT   2025250     91400   18.4800 -109.1200      10.3        68       133        60
WVCT   2025250     91400   18.5100 -109.2300       7.1        46       185        67
WVCT   2025250     91400   18.4300 -109.3000       7.7        47       170        84
WVCT   2025250     91400   18.4900 -109.3800       6.0        55       208        77
WVCT   2025250     91400   18.4600 -109.5100       5.6        72       206        82
WVCT   2025250     91400   18.4300 -109.7400       5.4        74       170        70
WVCT   2025250     91400   18.4900 -109.7500       6.9        83       208        82
WVCT   2025250     91400   18.4100 -109.9100       5.4        49       210        98
WVCT   2025250     91400   18.4600 -110.0900       8.3        73       179        94
WVCT   2025250     91400   18.4200 -110.1700       9.4        84       165        99
WVCT   2025250     91400   18.4800 -110.3300      12.1        59       158        90
WVCT   2025250     91400   18.4300 -110.4600      10.2        61       154        61
WVCT   2025250     91400   18.4700 -110.5000       8.3        57       152        60
WVCT   2025250     91400   18.4600 -110.8100      16.9       107       148        97
WVCT   2025250     91400   18.3800 -110.8500      12.8        92       149        95
WVCT   2025250     91400   18.4300 -111.0500       7.5        45       152        62
WVCT   2025250     91400   18.4200 -111.5100      10.1        83       122        80
WVCT   2025250     91400   18.4200 -111.5500       9.9        89       120        90
WVCT   2025250     91400   18.4200 -112.0200       8.5        92       153        60
WVCT   2025250     91400   18.3600 -112.2200       7.9        89       144        97
WVCT   2025250     91400   18.4200 -112.2600       7.2       100       152        92
WVCT   2025250     91400   18.3400 -112.9200       4.8       121       125        75
WVCT   2025250     91400   18.3300 -114.7200       6.3       160       172        95
WVCT   2025250     91400   18.2700 -116.6400       4.6       331       160       100
WVCT   2025250     91400   18.2900 -116.9000       7.7        23       160        95
WVCT   2025250     91400   18.1900 -117.5100       8.3         6       190        94
WVCT   2025250     91400   18.2500 -117.6300       6.5        42       193        97
WVCT   2025250     91400   18.1900 -117.7700       6.5        31       194        81
WVCT   2025250     91400   18.2200 -117.8300       5.1        30       199        65
WVCT   2025250     91400   18.2200 -117.9200       5.5        16       201        70
WVCT   2025250     91400   18.2400 -118.0400       7.2        25       165        88
WVCT   2025250     91400   18.2200 -118.1800       9.6        16       166        77
WVCT   2025250     91400   18.1900 -118.2200       9.1        19       167        72
WVCT   2025250     91400   18.2500 -118.4100      10.3        12       174        99
WVCT   2025250     91400   18.2300 -118.5000      12.7         6       170        98
WVCT   2025250     91400   18.2200 -118.6300      14.7         1       182        99
WVCT   2025250     91400   18.2000 -118.6500      15.0         2       184        99
WVCT   2025250     91400   18.2200 -118.8000      16.1         8       202        99
WVCT   2025250     91400   18.2000 -118.8900      14.7        10       193        99
WVCT   2025250     91400   18.2300 -119.0300      13.3         1       176        98
WVCT   2025250     91400   18.1500 -119.1500      10.7         4       171        98
WVCT   2025250     91400   18.1900 -119.2100      10.2         8       166        81
WVCT   2025250     91400   18.2300 -119.3500      11.8         2       160        62
WVCT   2025250     91400   18.3600 -109.0300       7.7        73       119        79
WVCT   2025250     91400   18.3300 -109.1300       8.4        79       120        62
WVCT   2025250     91400   18.3300 -109.1800       8.4        72       124        61
WVCT   2025250     91400   18.3700 -109.3600       7.6        56       167        97
WVCT   2025250     91400   18.3600 -109.4100       7.5        64       176        98
WVCT   2025250     91400   18.3800 -109.5300       6.3        54       196        75
WVCT   2025250     91400   18.3300 -109.7600       6.0        32       218        95
WVCT   2025250     91400   18.3100 -109.8900       7.3        26       215       100
WVCT   2025250     91400   18.3300 -109.9100       7.2        22       216       100
WVCT   2025250     91400   18.3600 -110.1200       6.7        94       183        96
WVCT   2025250     91400   18.3600 -110.1400       8.2        99       179        83
WVCT   2025250     91400   18.3000 -110.3000       8.9        74       162       100
WVCT   2025250     91400   18.2900 -110.4700      10.8        50       158        95
WVCT   2025250     91400   18.3300 -110.5300       8.6        43       157        80
WVCT   2025250     91400   18.3600 -110.8600      12.1        88       149        70
WVCT   2025250     91400   18.3400 -111.5700       5.3        71       112       100
WVCT   2025250     91400   18.2900 -111.7900       4.2       102       124        78
WVCT   2025250     91400   18.2500 -111.8200       4.0        98       136        82
WVCT   2025250     91400   18.2400 -112.1500       4.8        75       133        72
WVCT   2025250     91400   18.2600 -112.2700       8.8        80       136        82
WVCT   2025250     91400   18.2600 -112.2900       8.8        81       136        78
WVCT   2025250     91400   18.2500 -112.4500       4.0        96       136        97
WVCT   2025250     91400   18.2800 -112.8400       4.5       146       129        79
WVCT   2025250     91400   18.2200 -112.9700       5.3       130       137        97
WVCT   2025250     91400   18.2500 -113.0300       4.9       116       135        84
WVCT   2025250     91400   18.2000 -113.3900       4.3       103       143        91
WVCT   2025250     91400   18.2200 -113.4500       5.7       111       153        93
WVCT   2025250     91400   18.1400 -116.5400       5.5        24       169        85
WVCT   2025250     91400   18.1500 -116.9300       5.4        91       162        81
WVCT   2025250     91400   18.1000 -117.1300       6.1       134       173        93
WVCT   2025250     91400   18.1700 -117.4000       7.0         3       189        95
WVCT   2025250     91400   18.1700 -117.5300       8.5         9       190        94
WVCT   2025250     91400   18.0900 -117.6600      10.9        13       185        97
WVCT   2025250     91400   18.1300 -117.6900       9.7        20       187        99
WVCT   2025250     91400   18.0900 -117.8100       9.9         8       192        90
WVCT   2025250     91400   18.0800 -117.9800       6.9         5       189        78
WVCT   2025250     91400   18.1600 -118.0300       7.0        14       181        68
WVCT   2025250     91400   18.1200 -118.1900       7.8         6       170        68
WVCT   2025250     91400   18.1500 -118.2700       6.2        23       169        77
WVCT   2025250     91400   18.0900 -118.3900       6.2        24       169        97
WVCT   2025250     91400   18.1100 -118.4900      11.0         8       168        86
WVCT   2025250     91400   18.1200 -118.6400      13.8         3       172        95
WVCT   2025250     91400   18.1400 -118.6600      14.5         3       179        97
WVCT   2025250     91400   18.1400 -118.8100      15.1         8       194       100
WVCT   2025250     91400   18.1200 -118.8800      14.6         8       192       100
WVCT   2025250     91400   18.0600 -119.0000      14.9       360       184        95
WVCT   2025250     91400   18.1100 -119.1600      10.7         3       171        99
WVCT   2025250     91400   18.0900 -119.2700      10.2         9       157        87
WVCT   2025250     91400   18.1300 -119.3900      10.3         1       154        62
WVCT   2025250     91400   18.2600 -108.9000      10.6       117       134        93
WVCT   2025250     91400   18.2500 -109.1500      11.4        90       134        61
WVCT   2025250     91400   18.2300 -109.3000      12.9        73       153        98
WVCT   2025250     91400   18.2500 -109.3400      11.4        71       159        97
WVCT   2025250     91400   18.2600 -109.5100       8.5        62       178        80
WVCT   2025250     91400   18.3000 -109.5800       7.0        40       191        77
WVCT   2025250     91400   18.2400 -109.6900       7.2        23       219        93
WVCT   2025250     91400   18.2900 -109.8900       7.6        27       216        99
WVCT   2025250     91400   18.2000 -110.0300       7.4        39       216        90
WVCT   2025250     91400   18.2600 -110.1100       4.2        61       207        70
WVCT   2025250     91400   18.2400 -110.1700       4.6        62       183        70
WVCT   2025250     91400   18.2800 -110.3000       8.3        71       161       100
WVCT   2025250     91400   18.1900 -110.5100      11.4        51       154        90
WVCT   2025250     91400   18.2100 -110.5300      11.0        50       155        85
WVCT   2025250     91400   18.1800 -110.7100       6.5        54       153        63
WVCT   2025250     91400   18.2000 -110.8000       4.2        27       149        79
WVCT   2025250     91400   18.1700 -111.0900      10.7        68       146        60
WVCT   2025250     91400   18.2500 -111.2100       5.1        73       144        60
WVCT   2025250     91400   18.1700 -111.3000       5.0        68       138        96
WVCT   2025250     91400   18.1500 -111.7800       5.3        67       119        97
WVCT   2025250     91400   18.2200 -112.1100       4.3        74       134        95
WVCT   2025250     91400   18.1400 -112.2500       7.8        86       122        74
WVCT   2025250     91400   18.1500 -112.3100       9.0        87       126        86
WVCT   2025250     91400   18.2100 -112.4600       4.6        97       134        94
WVCT   2025250     91400   18.1800 -112.9300       4.3       139       141        94
WVCT   2025250     91400   18.1900 -113.0000       4.4       121       140        96
WVCT   2025250     91400   18.1000 -113.4300       4.3       108       146       100
WVCT   2025250     91400   18.0800 -114.7700       4.1       321       170        85
WVCT   2025250     91400   18.1200 -115.7900       5.2       167       169        67
WVCT   2025250     91400   18.1000 -115.8400       5.1       161       170        74
WVCT   2025250     91400   18.0200 -116.4900       4.8        45       174        98
WVCT   2025250     91400   18.0200 -116.5600       4.9        42       169        98
WVCT   2025250     91400   18.1000 -116.6100       4.8        12       164        84
WVCT   2025250     91400   18.0800 -117.1400       6.0       133       173        93
WVCT   2025250     91400   18.0800 -117.1600       4.7       139       174        92
WVCT   2025250     91400   18.0400 -117.4000       6.9         9       191        94
WVCT   2025250     91400   18.0300 -117.5400       8.4         3       189        95
WVCT   2025250     91400   18.0300 -117.6400      10.0         8       183        94
WVCT   2025250     91400   18.0500 -117.7700      10.8         8       187        88
WVCT   2025250     91400   17.9900 -117.8500      11.3       360       191        75
WVCT   2025250     91400   18.0600 -118.0100       7.3         2       188        86
WVCT   2025250     91400   18.0200 -118.0600       7.9       356       187        91
WVCT   2025250     91400   18.0500 -118.2700       5.0         7       170        61
WVCT   2025250     91400   18.0500 -118.3500       6.1        10       169        90
WVCT   2025250     91400   18.0500 -118.5000      12.3         3       166        98
WVCT   2025250     91400   17.9900 -118.6000      13.0         3       167        96
WVCT   2025250     91400   18.0400 -118.7600      13.8        10       197        99
WVCT   2025250     91400   18.0400 -118.8700      14.5        10       193       100
WVCT   2025250     91400   18.0400 -118.9100      14.5         8       191       100
WVCT   2025250     91400   18.0000 -119.0700      14.8         2       181        98
WVCT   2025250     91400   17.9900 -119.1500      14.9         2       166        96
WVCT   2025250     91400   18.0100 -119.2600      13.6         5       157        74
WVCT   2025250     91400   18.0300 -119.4000      12.3        15       139        92
WVCT   2025250     91400   18.1600 -108.7800       6.2        63       146        95
WVCT   2025250     91400   18.1400 -108.9600       8.1        91       147        94
WVCT   2025250     91400   18.1400 -108.9800       8.1        92       148        95
WVCT   2025250     91400   18.1700 -109.1700      12.6        86       146        70
WVCT   2025250     91400   18.2100 -109.3100      13.2        71       156        99
WVCT   2025250     91400   18.2000 -109.4300      11.1        62       174        98
WVCT   2025250     91400   18.2000 -109.4500      10.8        62       178        93
WVCT   2025250     91400   18.1600 -109.6300       7.5        52       206        83
WVCT   2025250     91400   18.1300 -109.8600       4.4        53       215        95
WVCT   2025250     91400   18.1500 -109.9500       5.7        51       215        90
WVCT   2025250     91400   18.1000 -110.1800       4.9        25       178        61
WVCT   2025250     91400   18.1500 -110.3800       7.8        35       157        96
WVCT   2025250     91400   18.1700 -110.5200      11.3        55       152        90
WVCT   2025250     91400   18.0900 -110.6100      11.1        79       144       100
WVCT   2025250     91400   18.1200 -110.7700       6.8        71       152        67
WVCT   2025250     91400   18.1400 -110.8600       5.2        71       147        94
WVCT   2025250     91400   18.0700 -110.9900       9.3        87       143        95
WVCT   2025250     91400   18.1500 -111.1200      10.4        66       146        61
WVCT   2025250     91400   18.0700 -111.2300      10.1        63       149        76
WVCT   2025250     91400   18.0700 -111.3000       7.8        66       147        96
WVCT   2025250     91400   18.0500 -111.6600       4.0        97       117        60
WVCT   2025250     91400   18.0500 -111.8400       4.7        54       125        89
WVCT   2025250     91400   18.1300 -111.8500       4.1        49       131        99
WVCT   2025250     91400   18.0400 -112.2200       6.0        92       111        71
WVCT   2025250     91400   18.0700 -112.3300       8.2        91       116        83
WVCT   2025250     91400   18.0700 -112.4900       6.6        97       125        99
WVCT   2025250     91400   18.0300 -113.0800       4.2       343       147        99
WVCT   2025250     91400   18.0900 -113.1600       4.0       333       150        71
WVCT   2025250     91400   18.0800 -113.4300       4.2       109       146        99
WVCT   2025250     91400   17.9700 -114.7000       4.4       323       167        97
WVCT   2025250     91400   18.0500 -114.7500       4.4       329       169        85
WVCT   2025250     91400   17.9400 -115.7800       4.6       156       170        99
WVCT   2025250     91400   18.0000 -116.5600       4.6        44       170        99
WVCT   2025250     91400   17.9000 -117.3600       8.1        15       203        97
WVCT   2025250     91400   17.9400 -117.4000       7.8        16       204       100
WVCT   2025250     91400   17.8900 -117.6000      12.0       355       193        99
WVCT   2025250     91400   17.8900 -117.6200      11.4       355       192        98
WVCT   2025250     91400   17.8900 -117.8000       7.2        22       187        93
WVCT   2025250     91400   17.9600 -117.8700      11.1       360       191        67
WVCT   2025250     91400   17.9000 -117.9500      12.5       356       190        83
WVCT   2025250     91400   17.9600 -118.1100       9.4       351       187        83
WVCT   2025250     91400   17.9100 -118.3500      11.0         0       172        94
WVCT   2025250     91400   17.8900 -118.3800      12.4         4       172        90
WVCT   2025250     91400   17.9300 -118.5400      13.6         2       171        99
WVCT   2025250     91400   17.9500 -118.5800      12.9         3       167       100
WVCT   2025250     91400   17.9400 -118.7300      12.7        10       205        94
WVCT   2025250     91400   17.9200 -118.8700      13.9        13       205        96
WVCT   2025250     91400   17.9200 -118.9100      14.2        14       203        99
WVCT   2025250     91400   17.9400 -119.1000      15.1         5       184        99
WVCT   2025250     91400   17.9400 -119.1200      15.5         4       175        99
WVCT   2025250     91400   17.8700 -119.3000      15.1         4       157        98
WVCT   2025250     91400   17.9300 -119.4200      10.9        14       136        94
WVCT   2025250     91400   18.0400 -108.9600       9.6        77       156        99
WVCT   2025250     91400   18.0700 -109.0700       8.1        86       152        96
WVCT   2025250     91400   18.0700 -109.1900       9.7        86       153        88
WVCT   2025250     91400   18.0300 -109.3500      11.1        85       178        96
WVCT   2025250     91400   18.0500 -109.3700      11.5        81       183        95
WVCT   2025250     91400   18.0400 -109.5900       8.8        75       203        88
WVCT   2025250     91400   18.0200 -109.6200       8.5        76       204        84
WVCT   2025250     91400   18.0300 -109.7800       6.2        72       208        96
WVCT   2025250     91400   18.0900 -109.8400       4.1        66       213        84
WVCT   2025250     91400   18.0600 -110.0400       6.1        57       207        86
WVCT   2025250     91400   18.0000 -110.2000       5.1        28       163        69
WVCT   2025250     91400   18.0200 -110.2900       5.3        17       156        93
WVCT   2025250     91400   18.0500 -110.3300       5.8        19       153        85
WVCT   2025250     91400   18.0500 -110.4500       6.7        42       137        86
WVCT   2025250     91400   17.9800 -110.6600      10.1        81       135        84
WVCT   2025250     91400   18.0200 -110.7200      11.2        87       145        86
WVCT   2025250     91400   17.9800 -110.9000      10.3        75       149        98
WVCT   2025250     91400   18.0300 -111.0200      10.3        79       144        76
WVCT   2025250     91400   17.9700 -111.0600      10.9        74       148        80
WVCT   2025250     91400   17.9900 -111.1800      11.6        69       152        70
WVCT   2025250     91400   17.9800 -111.3900       7.8        72       145        92
WVCT   2025250     91400   17.9800 -111.5100       7.1        73       129        99
WVCT   2025250     91400   17.9600 -111.5400       7.1        77       127        95
WVCT   2025250     91400   18.0300 -111.6800       4.3       102       117        80
WVCT   2025250     91400   18.0300 -111.8500       4.7        56       124        92
WVCT   2025250     91400   18.0100 -111.9200       5.6        50       124        79
WVCT   2025250     91400   18.0200 -112.0400       4.4        77       117        74
WVCT   2025250     91400   18.0200 -112.1800       5.5        96       109        66
WVCT   2025250     91400   17.9400 -112.2400       4.7        88       109        61
WVCT   2025250     91400   17.9900 -112.5300       4.9        95       116        84
WVCT   2025250     91400   17.9100 -114.6000       4.1       318       165        92
WVCT   2025250     91400   17.8500 -115.9700       9.1       356       179        63
WVCT   2025250     91400   17.8700 -116.2700       5.1        54       178        97
WVCT   2025250     91400   17.8400 -116.4100       4.8        53       177        86
WVCT   2025250     91400   17.8700 -116.8900       5.3       347       176        89
WVCT   2025250     91400   17.8400 -117.1100       5.4         4       182        92
WVCT   2025250     91400   17.8200 -117.2900       6.8         8       193        85
WVCT   2025250     91400   17.8200 -117.3100       7.3         7       195        84
WVCT   2025250     91400   17.8400 -117.4600      13.3         7       206        88
WVCT   2025250     91400   17.8100 -117.6100      15.1       355       198        98
WVCT   2025250     91400   17.8700 -117.6300      12.2       355       193        98
WVCT   2025250     91400   17.7900 -117.8300       9.7        14       189       100
WVCT   2025250     91400   17.7900 -117.8600       9.8        12       189       100
WVCT   2025250     91400   17.8600 -117.9700      15.8       349       190        99
WVCT   2025250     91400   17.8200 -118.0900      18.1       349       190        89
WVCT   2025250     91400   17.8600 -118.1700      13.6       348       188       100
WVCT   2025250     91400   17.8300 -118.3700      12.0        10       173        65
WVCT   2025250     91400   17.8300 -118.4700      12.9        13       171        84
WVCT   2025250     91400   17.8100 -118.5000      12.3        17       171        77
WVCT   2025250     91400   17.8500 -118.6000      11.9        14       180       100
WVCT   2025250     91400   17.8100 -118.7100      11.4        18       198        99
WVCT   2025250     91400   17.8400 -118.8800      14.1        14       210        99
WVCT   2025250     91400   17.7600 -118.9800      13.2        15       188       100
WVCT   2025250     91400   17.8000 -119.0800      14.0         6       182       100
WVCT   2025250     91400   17.8300 -119.2200      14.4         5       163        99
WVCT   2025250     91400   17.8300 -119.2800      14.2         6       158        99
WVCT   2025250     91400   17.7500 -119.4000      11.3         2       148        78
WVCT   2025250     91400   18.0200 -108.7900       5.9        72       158        92
WVCT   2025250     91400   18.0200 -108.9600       9.6        78       157        96
WVCT   2025250     91400   17.9300 -109.1300       8.1        88       156        93
WVCT   2025250     91400   17.9900 -109.2100       9.5        93       154        93
WVCT   2025250     91400   18.0100 -109.3300      10.7        87       168        96
WVCT   2025250     91400   17.9800 -109.4800       9.3        86       194        92
WVCT   2025250     91400   17.9600 -109.6100       9.3        86       205        80
WVCT   2025250     91400   17.9600 -109.6800       9.1        79       205        85
WVCT   2025250     91400   17.9300 -109.8300       8.2        63       207       100
WVCT   2025250     91400   17.9700 -109.9400       5.6        78       203        80
WVCT   2025250     91400   17.9900 -109.9900       5.6        79       201        81
WVCT   2025250     91400   17.9000 -110.2200       4.7        20       163        84
WVCT   2025250     91400   17.9800 -110.3200       5.8        15       155        95
WVCT   2025250     91400   17.9700 -110.3500       5.7        15       151        91
WVCT   2025250     91400   17.8900 -110.5100       7.6        62       141       100
WVCT   2025250     91400   17.9600 -110.6800       9.8        80       137        83
WVCT   2025250     91400   17.9000 -110.7200       8.1        76       139        71
WVCT   2025250     91400   17.8800 -110.9400      10.2        72       152        96
WVCT   2025250     91400   17.8800 -110.9700      10.8        73       152        97
WVCT   2025250     91400   17.8900 -111.1000      12.0        79       155        99
WVCT   2025250     91400   17.9100 -111.2400      12.4        84       158        83
WVCT   2025250     91400   17.9500 -111.3000      10.7        77       157        72
WVCT   2025250     91400   17.8600 -111.5100       7.4        71       142        87
WVCT   2025250     91400   17.9200 -111.5400       6.9        81       130        83
WVCT   2025250     91400   17.8500 -111.7700       7.8        73       131        63
WVCT   2025250     91400   17.8700 -111.8600       6.6        68       130        92
WVCT   2025250     91400   17.8400 -112.0000       8.0        74       128        99
WVCT   2025250     91400   17.9200 -112.0600       6.7        80       119        86
WVCT   2025250     91400   17.9200 -112.1700       5.3        87       110        64
WVCT   2025250     91400   17.9000 -112.2500       4.4        80       110        62
WVCT   2025250     91400   17.8300 -112.4200       5.9        10       110        60
WVCT   2025250     91400   17.8300 -112.4900       5.4        21       111        61
WVCT   2025250     91400   17.7900 -113.9700       4.1        24       140        91
WVCT   2025250     91400   17.7900 -113.9900       4.1        24       141        91
WVCT   2025250     91400   17.8400 -114.3900       4.3       339       160        76
WVCT   2025250     91400   17.8300 -114.4600       4.6       332       160        75
WVCT   2025250     91400   17.7900 -116.0200       7.4        23       179        64
WVCT   2025250     91400   17.7300 -116.2100       7.5        67       178        91
WVCT   2025250     91400   17.7300 -116.2800       7.7        66       178        99
WVCT   2025250     91400   17.7200 -116.3900       6.5        59       177       100
WVCT   2025250     91400   17.7300 -116.7600       4.5        12       177        98
WVCT   2025250     91400   17.7900 -116.8100       5.8       350       177        98
WVCT   2025250     91400   17.7700 -116.8800       7.9       351       177        99
WVCT   2025250     91400   17.7100 -117.0700       8.4       357       175        99
WVCT   2025250     91400   17.7000 -117.1800       6.4        16       179        98
WVCT   2025250     91400   17.7200 -117.2800       5.9        37       192        94
WVCT   2025250     91400   17.7800 -117.5100      15.8       358       202       100
WVCT   2025250     91400   17.7300 -117.6100      16.3       355       199        99
WVCT   2025250     91400   17.7500 -117.7500      13.2         4       191        97
WVCT   2025250     91400   17.7300 -117.9300      12.6       356       189       100
WVCT   2025250     91400   17.7000 -118.0000      11.6       359       190        88
WVCT   2025250     91400   17.6800 -118.1500      19.6       356       184        70
WVCT   2025250     91400   17.7400 -118.2500      17.7       354       183        92
WVCT   2025250     91400   17.7600 -118.3100      13.2         2       180        94
WVCT   2025250     91400   17.7500 -118.4200      12.1        10       173        61
WVCT   2025250     91400   17.7500 -118.5100      11.1        21       170        66
WVCT   2025250     91400   17.6900 -118.7100      11.1        26       186        87
WVCT   2025250     91400   17.7300 -118.7500      12.2        21       192        97
WVCT   2025250     91400   17.7000 -118.9200      14.4        17       191       100
WVCT   2025250     91400   17.7400 -119.0000      12.8        14       186       100
WVCT   2025250     91400   17.6800 -119.1200      14.3         7       172        96
WVCT   2025250     91400   17.7300 -119.2400      15.0         2       165        97
WVCT   2025250     91400   17.7100 -119.2600      15.4         2       162        99
WVCT   2025250     91400   17.6900 -119.4100      14.1       356       150        95
WVCT   2025250     91400   17.8800 -108.8200       5.8        96       160        96
WVCT   2025250     91400   17.9200 -108.9400       6.9        87       159        98
WVCT   2025250     91400   17.8900 -109.1400       7.1       100       158        91
WVCT   2025250     91400   17.9100 -109.1600       6.8        98       156       100
WVCT   2025250     91400   17.8200 -109.3700       8.5        81       195       100
WVCT   2025250     91400   17.8400 -109.4400       9.9        83       202       100
WVCT   2025250     91400   17.8800 -109.5500      10.1        89       206        99
WVCT   2025250     91400   17.8400 -109.6600      12.3        81       211       100
WVCT   2025250     91400   17.8100 -109.8100      10.8        59       214        97
WVCT   2025250     91400   17.8100 -109.9100       8.5        38       193        97
WVCT   2025250     91400   17.8400 -110.0900       4.4        54       171        97
WVCT   2025250     91400   17.8800 -110.1300       4.1        55       167        97
WVCT   2025250     91400   17.8800 -110.2500       4.6        10       163        79
WVCT   2025250     91400   17.8700 -110.5200       7.7        64       143        99
WVCT   2025250     91400   17.8200 -110.6900       7.8        69       138        96
WVCT   2025250     91400   17.8400 -110.8300       7.5        77       145       100
WVCT   2025250     91400   17.8200 -110.9300       8.9        74       154        97
WVCT   2025250     91400   17.7700 -111.0600      12.6        81       159       100
WVCT   2025250     91400   17.8100 -111.1700      13.4        81       157        99
WVCT   2025250     91400   17.7700 -111.3200      11.4        74       152        94
WVCT   2025250     91400   17.7600 -111.3900      10.7        75       153        89
WVCT   2025250     91400   17.8400 -111.5100       7.6        69       145        87
WVCT   2025250     91400   17.8000 -111.5900       7.4        59       140        91
WVCT   2025250     91400   17.7500 -111.7000       8.6        58       139        88
WVCT   2025250     91400   17.7700 -111.8600       9.4        59       135        97
WVCT   2025250     91400   17.7400 -112.0300       6.4        69       138        72
WVCT   2025250     91400   17.7600 -112.1100       8.2        78       133        90
WVCT   2025250     91400   17.7400 -112.1900       7.5        74       129        88
WVCT   2025250     91400   17.7800 -112.3200       5.1        39       122        65
WVCT   2025250     91400   17.8100 -112.4800       6.0        20       112        62
WVCT   2025250     91400   17.7700 -112.5300       6.2        26       116        61
WVCT   2025250     91400   17.7000 -113.6400       4.0       350       141        90
WVCT   2025250     91400   17.7600 -113.6800       4.0       346       139        91
WVCT   2025250     91400   17.6800 -114.3300       4.6       332       161        93
WVCT   2025250     91400   17.7000 -114.3500       4.3       330       160        90
WVCT   2025250     91400   17.6400 -115.8500       7.8        17       177        66
WVCT   2025250     91400   17.6300 -116.0500       8.2        78       177        61
WVCT   2025250     91400   17.6900 -116.1300       9.3        76       178        66
WVCT   2025250     91400   17.7100 -116.3000       7.8        68       178       100
WVCT   2025250     91400   17.6300 -116.4000       4.6        53       180        82
WVCT   2025250     91400   17.6600 -116.7700       4.9        30       177        99
WVCT   2025250     91400   17.6500 -116.7900       5.4        27       177       100
WVCT   2025250     91400   17.6300 -116.9100       7.2         4       176        99
WVCT   2025250     91400   17.6100 -117.1100       7.9         3       175        88
WVCT   2025250     91400   17.6800 -117.2000       6.2        26       182        95
WVCT   2025250     91400   17.6400 -117.4300       7.5        32       198        93
WVCT   2025250     91400   17.6000 -117.5000      13.7       345       192        99
WVCT   2025250     91400   17.5900 -117.9300      11.8         7       190        98
WVCT   2025250     91400   17.6300 -118.0100      10.0         2       191        98
WVCT   2025250     91400   17.6600 -118.1800      19.6       356       183        74
WVCT   2025250     91400   17.6400 -118.2500      19.4       355       183        95
WVCT   2025250     91400   17.6600 -118.3500      14.5         5       182        99
WVCT   2025250     91400   17.6100 -118.4900      12.6        13       175        94
WVCT   2025250     91400   17.6500 -118.6100       9.3        22       171        90
WVCT   2025250     91400   17.6100 -118.7200      10.6        29       185        65
WVCT   2025250     91400   17.6300 -118.8000      14.2        24       188        70
WVCT   2025250     91400   17.6200 -118.9100      15.5        22       188        93
WVCT   2025250     91400   17.6400 -119.0200      13.4        15       187        98
WVCT   2025250     91400   17.6400 -119.1000      13.9         8       174        98
WVCT   2025250     91400   17.5500 -119.3700      18.9       359       158        92
WVCT   2025250     91400   17.5500 -119.4500      19.7       355       151        82
WVCT   2025250     91400   17.7400 -108.9300       7.4        91       180        98
WVCT   2025250     91400   17.8200 -109.0300       8.1       101       173        95
WVCT   2025250     91400   17.8100 -109.0600       8.3       107       174        91
WVCT   2025250     91400   17.7500 -109.2400       6.2        98       191        75
WVCT   2025250     91400   17.7700 -109.3600       7.5        86       196        99
WVCT   2025250     91400   17.7200 -109.5400      11.6        83       200        99
WVCT   2025250     91400   17.7200 -109.5900      12.5        82       199        98
WVCT   2025250     91400   17.7100 -109.7800      12.9        61       193        99
WVCT   2025250     91400   17.7100 -109.8300      12.1        49       184       100
WVCT   2025250     91400   17.7700 -109.9200       9.7        34       178        94
WVCT   2025250     91400   17.7800 -110.0600       6.4        34       173        84
WVCT   2025250     91400   17.7000 -110.3200       4.9        35       160        85
WVCT   2025250     91400   17.7700 -110.4400       5.7        56       152        67
WVCT   2025250     91400   17.6900 -110.6300       9.5        60       137        73
WVCT   2025250     91400   17.7600 -110.7300       8.2        69       137        77
WVCT   2025250     91400   17.7600 -110.8500       7.1        76       147        73
WVCT   2025250     91400   17.7600 -110.8700       7.1        76       149        71
WVCT   2025250     91400   17.7500 -111.0900      12.6        83       160       100
WVCT   2025250     91400   17.7300 -111.1100      12.6        83       159       100
WVCT   2025250     91400   17.6900 -111.3100      10.4        73       132        93
WVCT   2025250     91400   17.7200 -111.4500       9.4        77       121        96
WVCT   2025250     91400   17.6800 -111.5700       5.9        60       144        99
WVCT   2025250     91400   17.6600 -111.6000       5.2        56       146        92
WVCT   2025250     91400   17.6500 -111.7900       8.8        75       144        73
WVCT   2025250     91400   17.7300 -111.8900       7.9        59       140        85
WVCT   2025250     91400   17.7300 -111.9400       7.2        59       140        68
WVCT   2025250     91400   17.6800 -112.1100       5.9        66       138        75
WVCT   2025250     91400   17.6800 -112.2200       6.7        63       131        92
WVCT   2025250     91400   17.6900 -112.5700       8.2        26       124        70
WVCT   2025250     91400   17.6300 -112.6500       5.3        16       132        93
WVCT   2025250     91400   17.7000 -112.9400       4.1        13       129        98
WVCT   2025250     91400   17.6800 -113.6300       4.1       356       142        90
WVCT   2025250     91400   17.6800 -113.6700       4.0       347       142        85
WVCT   2025250     91400   17.6600 -114.1900       4.3       347       155        83
WVCT   2025250     91400   17.6600 -114.3100       4.8       332       163        99
WVCT   2025250     91400   17.6000 -114.4500       4.5       319       168        99
WVCT   2025250     91400   17.6300 -114.5600       4.2       325       167        90
WVCT   2025250     91400   17.5900 -114.6600       5.5       336       169        92
WVCT   2025250     91400   17.6400 -115.0100       4.8       326       191        72
WVCT   2025250     91400   17.6400 -115.1000       4.3       330       187        84
WVCT   2025250     91400   17.6200 -115.7700       5.0        18       176        71
WVCT   2025250     91400   17.6200 -115.8500       7.4        18       177        76
WVCT   2025250     91400   17.6000 -116.0100       7.0        64       176        63
WVCT   2025250     91400   17.6100 -116.0300       7.8        74       176        61
WVCT   2025250     91400   17.5300 -116.2000       9.7        49       181        91
WVCT   2025250     91400   17.5900 -116.3400       5.1        53       178        84
WVCT   2025250     91400   17.5900 -116.3700       4.9        49       178        81
WVCT   2025250     91400   17.6000 -116.7100       4.7        28       178        98
WVCT   2025250     91400   17.5200 -116.8200       6.6         8       180        97
WVCT   2025250     91400   17.5900 -116.9300       7.0         3       177        83
WVCT   2025250     91400   17.5900 -117.0900       7.9         4       176        85
WVCT   2025250     91400   17.5900 -117.1300       7.9         5       180        82
WVCT   2025250     91400   17.5400 -117.3300       9.4        38       193        96
WVCT   2025250     91400   17.5000 -117.4000      11.0        40       193        99
WVCT   2025250     91400   17.5800 -117.5200      13.6       345       181       100
WVCT   2025250     91400   17.5400 -117.5900      13.4       345       176       100
WVCT   2025250     91400   17.4900 -117.7500      11.0       359       183        78
WVCT   2025250     91400   17.4900 -118.0100      11.4        26       187        94
WVCT   2025250     91400   17.5600 -118.1500      15.2       350       183       100
WVCT   2025250     91400   17.5600 -118.2400      16.4       352       182        98
WVCT   2025250     91400   17.4800 -118.3300      12.4       355       177        97
WVCT   2025250     91400   17.5600 -118.4500      13.6         8       175        69
WVCT   2025250     91400   17.4700 -118.6100      14.2        10       174        82
WVCT   2025250     91400   17.5100 -118.6500      11.2        14       175        89
WVCT   2025250     91400   17.4600 -118.9800      12.8        38       187        98
WVCT   2025250     91400   17.5000 -119.1600      13.3        12       175        97
WVCT   2025250     91400   17.5000 -119.2700      16.7         6       169        98
WVCT   2025250     91400   17.5000 -119.3600      18.5         1       165        92
WVCT   2025250     91400   17.4600 -119.4000      18.7         1       164        90
WVCT   2025250     91400   17.7200 -108.9300       7.5        90       181        96
WVCT   2025250     91400   17.6300 -109.0500       8.7        75       185        86
WVCT   2025250     91400   17.6300 -109.2000       6.2        63       187        72
WVCT   2025250     91400   17.6700 -109.3100       6.2        79       193        96
WVCT   2025250     91400   17.7100 -109.3300       5.5        88       192        94
WVCT   2025250     91400   17.6600 -109.5300      12.4        83       200       100
WVCT   2025250     91400   17.6800 -109.5800      13.1        83       198        99
WVCT   2025250     91400   17.6900 -109.7900      13.0        61       186        99
WVCT   2025250     91400   17.6900 -109.8400      12.2        50       182        99
WVCT   2025250     91400   17.6900 -109.9600      11.2        37       177        91
WVCT   2025250     91400   17.6600 -110.0800       9.6        44       174        77
WVCT   2025250     91400   17.6200 -110.2900       7.9        58       161        81
WVCT   2025250     91400   17.5900 -110.4100      10.7        67       155        92
WVCT   2025250     91400   17.6100 -110.4300       9.9        64       154        92
WVCT   2025250     91400   17.6700 -110.6100       9.5        59       137        72
WVCT   2025250     91400   17.5900 -110.6700       8.5        68       139        77
WVCT   2025250     91400   17.6600 -110.8200       8.3        73       140        75
WVCT   2025250     91400   17.6400 -110.9200       7.4        78       155        72
WVCT   2025250     91400   17.6300 -111.0200       9.0        86       160        91
WVCT   2025250     91400   17.6100 -111.1400       9.8        84       160        84
WVCT   2025250     91400   17.6500 -111.3200      10.8        77       125        95
WVCT   2025250     91400   17.5800 -111.4800       7.1        70       116        93
WVCT   2025250     91400   17.5800 -111.5000       6.9        67       127        92
WVCT   2025250     91400   17.6200 -111.6100       4.7        44       148        73
WVCT   2025250     91400   17.6100 -111.9400       6.3        77       148        87
WVCT   2025250     91400   17.6300 -111.9600       5.6        67       146        77
WVCT   2025250     91400   17.5800 -112.2200       6.5        15       136        97
WVCT   2025250     91400   17.5800 -112.3400       6.8        11       133        93
WVCT   2025250     91400   17.5500 -112.4600       7.3         4       137        90
WVCT   2025250     91400   17.6100 -112.6300       5.4        15       133        72
WVCT   2025250     91400   17.5300 -112.6900       5.6         6       138        69
WVCT   2025250     91400   17.5800 -112.7800       5.2        12       138        96
WVCT   2025250     91400   17.5300 -113.2200       4.8       341       140        98
WVCT   2025250     91400   17.5700 -113.2600       5.1       351       139        99
WVCT   2025250     91400   17.5600 -113.4400       6.5        13       143        71
WVCT   2025250     91400   17.5600 -113.5100       6.7        12       143        66
WVCT   2025250     91400   17.5200 -113.5900       7.1       351       144        78
WVCT   2025250     91400   17.5200 -113.7900       6.0         6       148        96
WVCT   2025250     91400   17.5700 -113.9000       4.1         8       149        97
WVCT   2025250     91400   17.5300 -114.0200       4.0       340       155        84
WVCT   2025250     91400   17.5300 -114.0600       4.0       340       160        78
WVCT   2025250     91400   17.5000 -114.2500       5.6       348       166        83
WVCT   2025250     91400   17.4800 -114.3000       6.4       348       167        88
WVCT   2025250     91400   17.5200 -114.4000       5.3       344       170        74
WVCT   2025250     91400   17.5000 -114.5400       5.1       339       172        96
WVCT   2025250     91400   17.5500 -114.6400       5.9       337       170        92
WVCT   2025250     91400   17.5100 -114.7200       5.8       347       175        87
WVCT   2025250     91400   17.5400 -115.1400       4.3       338       188        84
WVCT   2025250     91400   17.4600 -116.0400       4.1        64       182        80
WVCT   2025250     91400   17.4600 -116.0600       4.0        62       182        68
WVCT   2025250     91400   17.4300 -116.2600       9.7        35       179        90
WVCT   2025250     91400   17.4300 -116.2800       9.8        32       179        85
WVCT   2025250     91400   17.4300 -116.4800       7.1        19       182        83
WVCT   2025250     91400   17.4600 -116.8000       6.6        14       181        90
WVCT   2025250     91400   17.5000 -116.8200       7.0         6       181        96
WVCT   2025250     91400   17.4500 -117.0200       8.0       359       184        86
WVCT   2025250     91400   17.4100 -117.0700       8.3       360       190        85
WVCT   2025250     91400   17.4500 -117.1500      10.0         6       204        80
WVCT   2025250     91400   17.4500 -117.2800      11.6        10       191        94
WVCT   2025250     91400   17.4800 -117.4300      11.5        42       190        96
WVCT   2025250     91400   17.4000 -117.5100      11.2        42       186        92
WVCT   2025250     91400   17.4800 -117.6700      11.3       354       176        98
WVCT   2025250     91400   17.4600 -117.6900      11.2       356       179        99
WVCT   2025250     91400   17.4700 -117.9900      11.9        33       187        72
WVCT   2025250     91400   17.4700 -118.0100      11.5        26       187        92
WVCT   2025250     91400   17.4400 -118.1700      12.0       350       179        99
WVCT   2025250     91400   17.4400 -118.3000      10.9       347       177        97
WVCT   2025250     91400   17.3800 -118.3700       9.5         4       176        98
WVCT   2025250     91400   17.3800 -118.5400      14.3         7       165        92
WVCT   2025250     91400   17.4100 -118.8600      10.6        67       183        84
WVCT   2025250     91400   17.4500 -118.9600      13.1        42       187        98
WVCT   2025250     91400   17.3900 -119.0100      12.5        43       188        99
WVCT   2025250     91400   17.3800 -119.1800      14.7        15       190        95
WVCT   2025250     91400   17.4000 -119.2000      14.3        15       186        93
WVCT   2025250     91400   17.3800 -119.3300      16.0         9       170        98
WVCT   2025250     91400   17.6100 -109.0600       8.2        75       185        79
WVCT   2025250     91400   17.5700 -109.2100       6.0        51       187        68
WVCT   2025250     91400   17.5700 -109.2900       6.9        57       188        67
WVCT   2025250     91400   17.5800 -109.4500      12.3        85       204        96
WVCT   2025250     91400   17.5800 -109.5300      13.2        87       196       100
WVCT   2025250     91400   17.5800 -109.6200      14.0        87       177       100
WVCT   2025250     91400   17.5300 -109.7500      13.2        84       172       100
WVCT   2025250     91400   17.5900 -109.8600      11.5        67       177        98
WVCT   2025250     91400   17.5600 -110.0300      10.7        65       171        76
WVCT   2025250     91400   17.5000 -110.1700      12.3        73       167        99
WVCT   2025250     91400   17.5800 -110.2900       9.7        66       161        84
WVCT   2025250     91400   17.5700 -110.3900      11.1        70       157        93
WVCT   2025250     91400   17.4900 -110.4800      11.3        78       157        99
WVCT   2025250     91400   17.4900 -110.6200       7.5        84       150        95
WVCT   2025250     91400   17.5400 -110.7800       6.4        78       141        84
WVCT   2025250     91400   17.5400 -110.9000       7.7        80       151        93
WVCT   2025250     91400   17.5600 -110.9200       8.2        80       152        95
WVCT   2025250     91400   17.5300 -111.0900       8.7        75       158        92
WVCT   2025250     91400   17.5100 -111.1900       8.1        72       159        92
WVCT   2025250     91400   17.4700 -111.3400       6.4        65       155        91
WVCT   2025250     91400   17.5400 -111.4400       6.4        66       139        95
WVCT   2025250     91400   17.5300 -111.7000       6.9        59       152        61
WVCT   2025250     91400   17.5100 -111.8900       9.4        84       151        90
WVCT   2025250     91400   17.4900 -112.0300       4.3        26       150        86
WVCT   2025250     91400   17.5000 -112.2400       8.5         1       139        69
WVCT   2025250     91400   17.4700 -112.4100       9.5         8       136        97
WVCT   2025250     91400   17.4700 -112.4500       9.9        12       138        95
WVCT   2025250     91400   17.5100 -112.6800       5.4         8       139        65
WVCT   2025250     91400   17.4800 -112.8000       5.7        15       141        83
WVCT   2025250     91400   17.4900 -113.1600       4.2       335       143        96
WVCT   2025250     91400   17.4100 -113.4300       4.5        16       147        70
WVCT   2025250     91400   17.4000 -113.5200       6.4       357       147        84
WVCT   2025250     91400   17.4400 -113.6300       6.9       328       145        91
WVCT   2025250     91400   17.4800 -113.8000       5.9       360       149        89
WVCT   2025250     91400   17.4300 -113.8300       6.9         4       151        91
WVCT   2025250     91400   17.4700 -113.9800       5.7       354       157        79
WVCT   2025250     91400   17.4500 -114.1000       6.6       342       166        86
WVCT   2025250     91400   17.3800 -114.2200       6.8       345       168        82
WVCT   2025250     91400   17.3800 -114.3800       5.8       359       170        70
WVCT   2025250     91400   17.4200 -114.4200       6.2       359       171        68
WVCT   2025250     91400   17.3800 -114.5600       5.0       358       175        90
WVCT   2025250     91400   17.3700 -114.6500       5.6       352       178       100
WVCT   2025250     91400   17.4300 -114.7800       5.4       355       190        95
WVCT   2025250     91400   17.3700 -115.6800       6.4        53       178        72
WVCT   2025250     91400   17.3700 -116.2300       8.8        48       177        97
WVCT   2025250     91400   17.3700 -116.3400       9.5        38       176        70
WVCT   2025250     91400   17.3900 -116.4900       7.4        20       183        86
WVCT   2025250     91400   17.3800 -116.9000       5.1        34       181        76
WVCT   2025250     91400   17.3300 -117.0400       6.5         0       181        90
WVCT   2025250     91400   17.3500 -117.0600       7.0       359       181        92
WVCT   2025250     91400   17.3900 -117.1600       9.4         4       208        79
WVCT   2025250     91400   17.3700 -117.2700       9.8        11       208        85
WVCT   2025250     91400   17.3800 -117.4000      10.3        34       194        89
WVCT   2025250     91400   17.3800 -117.5300      11.1        34       185        91
WVCT   2025250     91400   17.3600 -117.6400      12.4        15       183        81
WVCT   2025250     91400   17.3600 -117.7100      12.6        16       185        79
WVCT   2025250     91400   17.2900 -117.9100      11.8        36       186       100
WVCT   2025250     91400   17.3100 -117.9300      11.8        37       186        94
WVCT   2025250     91400   17.3700 -118.0900      10.9        20       181        96
WVCT   2025250     91400   17.2900 -118.2100       8.3         1       178        90
WVCT   2025250     91400   17.3200 -118.3200       8.3         5       175        97
WVCT   2025250     91400   17.3600 -118.3700       9.3         7       175        99
WVCT   2025250     91400   17.2800 -118.5600      13.7        11       163        93
WVCT   2025250     91400   17.2900 -118.6400      15.0         7       164        97
WVCT   2025250     91400   17.3100 -118.8100      14.2        20       182        89
WVCT   2025250     91400   17.3100 -118.9800      13.5        47       185        99
WVCT   2025250     91400   17.3500 -119.0200      13.5        38       188        85
WVCT   2025250     91400   17.3400 -119.1900      17.0        12       192        99
WVCT   2025250     91400   17.2600 -119.2800      16.9        20       175       100
WVCT   2025250     91400   17.3400 -119.3100      16.5        13       171        99
WVCT   2025250     91400   17.2800 -119.5100      16.0        13       168        96
WVCT   2025250     91400   17.4900 -109.1100       6.0        91       195        99
WVCT   2025250     91400   17.5100 -109.1800       4.9        77       198        83
WVCT   2025250     91400   17.4900 -109.2800       5.8        71       194        62
WVCT   2025250     91400   17.5000 -109.4500      11.6        88       198        85
WVCT   2025250     91400   17.4800 -109.5700      12.6        96       177        98
WVCT   2025250     91400   17.4400 -109.6500      11.8        97       174        93
WVCT   2025250     91400   17.4700 -109.8200      13.3        88       174        89
WVCT   2025250     91400   17.4100 -109.8800      13.4        89       178        90
WVCT   2025250     91400   17.4800 -110.0800      12.3        79       168        97
WVCT   2025250     91400   17.4400 -110.1300      12.7        80       167        97
WVCT   2025250     91400   17.4000 -110.2400      12.2        77       165        96
WVCT   2025250     91400   17.3900 -110.3800      10.6        72       162        92
WVCT   2025250     91400   17.4700 -110.5300      10.3        81       156       100
WVCT   2025250     91400   17.4300 -110.6100       7.5        79       157        83
WVCT   2025250     91400   17.4000 -110.8800       4.2        83       154        62
WVCT   2025250     91400   17.4400 -110.9400       7.1        81       154        79
WVCT   2025250     91400   17.3700 -111.1000       8.5        65       155        95
WVCT   2025250     91400   17.4300 -111.2700       6.5        59       157        99
WVCT   2025250     91400   17.4300 -111.3000       6.7        61       157       100
WVCT   2025250     91400   17.4000 -111.4900       6.2        47       149        63
WVCT   2025250     91400   17.4400 -111.5800       6.5        48       149        75
WVCT   2025250     91400   17.3500 -111.7600       8.8        50       140        75
WVCT   2025250     91400   17.3700 -111.8000       9.9        58       141        89
WVCT   2025250     91400   17.3500 -111.9200      10.3        69       141        70
WVCT   2025250     91400   17.3700 -112.0100       8.8        72       147        73
WVCT   2025250     91400   17.3700 -112.4500      18.8        46       140        99
WVCT   2025250     91400   17.3600 -112.9600      12.2        78       147        98
WVCT   2025250     91400   17.4000 -113.0400       9.8        60       147        98
WVCT   2025250     91400   17.3100 -113.2600       9.7        66       154        85
WVCT   2025250     91400   17.3100 -113.3600       7.3        56       153        68
WVCT   2025250     91400   17.3700 -113.4800       6.0        10       148        77
WVCT   2025250     91400   17.3800 -113.5000       6.2         4       148        81
WVCT   2025250     91400   17.3800 -113.6100       6.4       325       149        80
WVCT   2025250     91400   17.3200 -113.8300       5.6         4       157        64
WVCT   2025250     91400   17.3400 -113.8500       6.3         6       156        72
WVCT   2025250     91400   17.3700 -113.9800       9.1        15       163        95
WVCT   2025250     91400   17.2900 -114.1700       7.2       340       169        86
WVCT   2025250     91400   17.3600 -114.2300       6.9       343       168        80
WVCT   2025250     91400   17.3600 -114.3900       5.6       358       170        70
WVCT   2025250     91400   17.3400 -114.5700       4.3         7       176        89
WVCT   2025250     91400   17.3500 -114.6600       5.2       355       179        99
WVCT   2025250     91400   17.2700 -114.7600       4.9       345       182        93
WVCT   2025250     91400   17.3300 -114.8600       4.8       356       190        89
WVCT   2025250     91400   17.2900 -115.7600       6.2        51       181        93
WVCT   2025250     91400   17.2600 -116.0500       4.7        19       185        66
WVCT   2025250     91400   17.3000 -116.1500       6.3        44       181        66
WVCT   2025250     91400   17.2700 -116.2400       7.7        57       176        91
WVCT   2025250     91400   17.2700 -116.3300       7.9        46       176        81
WVCT   2025250     91400   17.2300 -116.4700       6.8         0       198        89
WVCT   2025250     91400   17.2800 -116.8300       4.9       107       185        61
WVCT   2025250     91400   17.2600 -116.8600       4.2       108       185        68
WVCT   2025250     91400   17.2900 -117.0300       6.0         2       179        79
WVCT   2025250     91400   17.2300 -117.0800       6.4       357       182        85
WVCT   2025250     91400   17.2500 -117.1800       7.0         4       206        76
WVCT   2025250     91400   17.2900 -117.3100       9.3        18       211        78
WVCT   2025250     91400   17.2400 -117.4900      11.1        23       185        87
WVCT   2025250     91400   17.2400 -117.5100      11.3        21       185        93
WVCT   2025250     91400   17.2600 -117.6800      15.6        25       186        98
WVCT   2025250     91400   17.2800 -117.7900      13.5        33       189        96
WVCT   2025250     91400   17.2300 -117.9000      11.2        32       185        93
WVCT   2025250     91400   17.2100 -117.9500      10.1        33       185        80
WVCT   2025250     91400   17.2700 -118.0400      12.2        40       184        92
WVCT   2025250     91400   17.2300 -118.2200       8.0         6       178        89
WVCT   2025250     91400   17.2200 -118.2700       8.0         8       177        96
WVCT   2025250     91400   17.2200 -118.4200      11.5        22       170        97
WVCT   2025250     91400   17.2600 -118.5600      13.7        13       162        91
WVCT   2025250     91400   17.2600 -118.6200      14.3        10       163        92
WVCT   2025250     91400   17.1800 -118.7000      14.7        16       175        99
WVCT   2025250     91400   17.1900 -118.8000      16.7        11       186        80
WVCT   2025250     91400   17.2300 -118.9100      15.7        19       186        99
WVCT   2025250     91400   17.2400 -119.3100      16.7        22       173        99
WVCT   2025250     91400   17.2400 -119.3300      16.4        23       172        99
WVCT   2025250     91400   17.2200 -119.5200      15.6        14       170        99
WVCT   2025250     91400   17.4200 -109.0500       7.3        80       201        90
WVCT   2025250     91400   17.4100 -109.2000       6.1        89       202        97
WVCT   2025250     91400   17.3300 -109.3700       9.3        79       199        96
WVCT   2025250     91400   17.3400 -109.4300      10.5        82       191       100
WVCT   2025250     91400   17.3400 -109.5600      11.7        92       189        95
WVCT   2025250     91400   17.3200 -109.7100      11.0        86       194        82
WVCT   2025250     91400   17.3300 -109.8500      11.2        81       189        97
WVCT   2025250     91400   17.3900 -109.8800      13.2        88       182        87
WVCT   2025250     91400   17.3000 -110.0700      11.9        77       172        97
WVCT   2025250     91400   17.3000 -110.1400      12.6        78       170        90
WVCT   2025250     91400   17.3600 -110.3200      11.0        74       163        97
WVCT   2025250     91400   17.2900 -110.4500      10.8        75       162        95
WVCT   2025250     91400   17.3700 -110.4800       9.8        68       160        76
WVCT   2025250     91400   17.3500 -110.7000       5.8        65       158        78
WVCT   2025250     91400   17.3600 -110.7200       4.6        69       158        95
WVCT   2025250     91400   17.2900 -111.0900       4.8        52       155        66
WVCT   2025250     91400   17.2600 -111.4200      10.5        40       145        71
WVCT   2025250     91400   17.3000 -111.4600      11.1        47       147        93
WVCT   2025250     91400   17.2900 -111.8200       7.3        54       126        84
WVCT   2025250     91400   17.3100 -111.9100      10.7        67       132        70
WVCT   2025250     91400   17.2700 -112.0500      13.4        72       140        61
WVCT   2025250     91400   17.2400 -112.1700      10.1        58       142        64
WVCT   2025250     91400   17.2400 -112.4300      20.8        49       138        99
WVCT   2025250     91400   17.2700 -112.4900      19.9        57       141        96
WVCT   2025250     91400   17.2300 -112.6800      14.6        83       150        91
WVCT   2025250     91400   17.2300 -112.7500      13.3        88       151        78
WVCT   2025250     91400   17.2200 -112.8900      10.4        82       152        80
WVCT   2025250     91400   17.2600 -112.9500      10.2        87       151        97
WVCT   2025250     91400   17.2400 -113.1200       5.8        49       154       100
WVCT   2025250     91400   17.2900 -113.1800      15.4        55       153        99
WVCT   2025250     91400   17.2900 -113.3800       8.4        53       154        71
WVCT   2025250     91400   17.2700 -113.4100       8.6        50       155        67
WVCT   2025250     91400   17.2700 -113.5200       7.3        18       155        71
WVCT   2025250     91400   17.2400 -113.6900       6.3        12       158        83
WVCT   2025250     91400   17.2100 -113.9600      10.6        27       165        92
WVCT   2025250     91400   17.1900 -114.0800       7.4       353       170        84
WVCT   2025250     91400   17.1900 -114.1000       7.3       350       170        79
WVCT   2025250     91400   17.1900 -114.2400       6.8       351       171        98
WVCT   2025250     91400   17.2100 -114.7500       4.7       347       182        82
WVCT   2025250     91400   17.2300 -114.8400       5.0       342       189        89
WVCT   2025250     91400   17.1600 -115.2900       4.5         4       184        82
WVCT   2025250     91400   17.1600 -115.4300       5.9         6       171        93
WVCT   2025250     91400   17.1500 -115.4900       6.4        11       172        91
WVCT   2025250     91400   17.2100 -115.5700       5.9        14       175        70
WVCT   2025250     91400   17.1700 -115.7600       4.0        34       181        93
WVCT   2025250     91400   17.2000 -115.8400       4.3        27       185        82
WVCT   2025250     91400   17.2000 -115.8800       4.0        16       186        72
WVCT   2025250     91400   17.1400 -116.0700       6.5       357       184        73
WVCT   2025250     91400   17.1600 -116.1800       7.5        34       188        67
WVCT   2025250     91400   17.2100 -116.2300       7.9        53       181        75
WVCT   2025250     91400   17.1500 -116.4200       9.0       353       200        98
WVCT   2025250     91400   17.1100 -117.0800       7.5         2       185        99
WVCT   2025250     91400   17.1300 -117.0900       7.1         2       189        98
WVCT   2025250     91400   17.1100 -117.2300      10.1         7       215        79
WVCT   2025250     91400   17.1900 -117.3900      12.1        25       208        98
WVCT   2025250     91400   17.1400 -117.5000      11.7        23       183       100
WVCT   2025250     91400   17.0900 -117.9400      10.7        25       184        70
WVCT   2025250     91400   17.1100 -117.9600       9.7        26       184        77
WVCT   2025250     91400   17.1100 -118.1100      12.1        31       186        80
WVCT   2025250     91400   17.0900 -118.2400      10.5       359       177        99
WVCT   2025250     91400   17.0900 -118.3100      10.6         5       176        99
WVCT   2025250     91400   17.0800 -118.3900      12.4        29       173        94
WVCT   2025250     91400   17.1200 -118.5200      14.0        34       164        97
WVCT   2025250     91400   17.0800 -118.6500      13.4        32       177        89
WVCT   2025250     91400   17.1000 -118.7800      15.5        25       183        99
WVCT   2025250     91400   17.0900 -118.8400      16.5        20       186        95
WVCT   2025250     91400   17.0700 -118.9500      17.0        20       184        87
WVCT   2025250     91400   17.0600 -119.3100      16.8        14       175       100
WVCT   2025250     91400   17.0600 -119.4400      15.9        15       175        94
WVCT   2025250     91400   17.1400 -119.5100      15.0        14       173        94
WVCT   2025250     91400   17.2800 -108.9900       6.4        49       179        62
WVCT   2025250     91400   17.2500 -109.2400       9.8        70       195        93
WVCT   2025250     91400   17.2400 -109.4100      10.9        80       208        99
WVCT   2025250     91400   17.2800 -109.5000      12.2        86       205       100
WVCT   2025250     91400   17.2600 -109.5500      12.9        89       206        97
WVCT   2025250     91400   17.3000 -109.7100      11.2        85       197        84
WVCT   2025250     91400   17.2500 -109.7900       9.9        70       194       100
WVCT   2025250     91400   17.2100 -110.0200       7.3        48       173        72
WVCT   2025250     91400   17.2900 -110.0500      10.5        70       172        99
WVCT   2025250     91400   17.2800 -110.1900      12.2        76       171        89
WVCT   2025250     91400   17.2800 -110.2600      13.3        81       167        77
WVCT   2025250     91400   17.2400 -110.3900      11.5        81       163        73
WVCT   2025250     91400   17.2300 -110.6100       9.5        65       160        62
WVCT   2025250     91400   17.2300 -110.6300       9.3        65       160        65
WVCT   2025250     91400   17.2000 -110.7600       7.9        71       162        89
WVCT   2025250     91400   17.1800 -110.9700       4.7       116       162        77
WVCT   2025250     91400   17.2500 -111.1700       5.2        50       154        70
WVCT   2025250     91400   17.1700 -111.3300       8.2        61       153        98
WVCT   2025250     91400   17.2400 -111.5700       8.2        11       128        66
WVCT   2025250     91400   17.2300 -111.8000       4.5        44       122        65
WVCT   2025250     91400   17.2300 -111.9200      10.4        73       126        68
WVCT   2025250     91400   17.1500 -112.0800      14.9        73       134        89
WVCT   2025250     91400   17.1300 -112.6100      16.1        64       150        71
WVCT   2025250     91400   17.1500 -112.6300      15.8        67       151        77
WVCT   2025250     91400   17.1900 -112.7800      11.5        70       153        99
WVCT   2025250     91400   17.2000 -112.8500      10.8        78       153        79
WVCT   2025250     91400   17.1600 -113.0400       9.4        29       156        87
WVCT   2025250     91400   17.1600 -113.0900       9.3        23       156        86
WVCT   2025250     91400   17.1700 -113.2700      15.9        65       158        79
WVCT   2025250     91400   17.1700 -113.3100      16.0        67       158        84
WVCT   2025250     91400   17.1400 -113.7000       9.3        32       159        77
WVCT   2025250     91400   17.1000 -113.8700      14.5        42       163        63
WVCT   2025250     91400   17.1200 -113.8900      10.4        33       166        87
WVCT   2025250     91400   17.1700 -114.0800       7.5       351       171        86
WVCT   2025250     91400   17.1500 -114.2000       8.3       356       172        98
WVCT   2025250     91400   17.1700 -114.2200       7.5       352       171        98
WVCT   2025250     91400   17.1300 -114.7400       4.4       337       181        94
WVCT   2025250     91400   17.1200 -115.2800       5.5         4       183        82
WVCT   2025250     91400   17.0800 -115.4000       5.1        18       170        98
WVCT   2025250     91400   17.1000 -115.4600       5.0        22       170        97
WVCT   2025250     91400   17.0500 -115.6200       6.7        46       173        71
WVCT   2025250     91400   17.0900 -115.7000       6.2        35       176        79
WVCT   2025250     91400   17.0600 -116.1500       7.4        44       189        91
WVCT   2025250     91400   17.0800 -116.2800       9.2        61       191        84
WVCT   2025250     91400   17.0700 -116.4300       9.1         1       200        95
WVCT   2025250     91400   17.0700 -116.4500       9.3         0       201        98
WVCT   2025250     91400   17.0700 -116.6300       6.7       356       184        92
WVCT   2025250     91400   17.0200 -116.8700       4.5         5       183       100
WVCT   2025250     91400   17.0200 -116.9000       5.3         8       183        98
WVCT   2025250     91400   17.0200 -117.0500      10.1        12       197        96
WVCT   2025250     91400   17.0100 -117.1800       9.8         9       215        98
WVCT   2025250     91400   17.0100 -117.2200      10.1        12       215        92
WVCT   2025250     91400   17.0900 -117.4100      12.6        31       191        99
WVCT   2025250     91400   17.0300 -117.5000       9.6        21       184        65
WVCT   2025250     91400   17.0600 -117.5600      11.9         8       179        82
WVCT   2025250     91400   17.0000 -117.6600      11.3         2       182        98
WVCT   2025250     91400   17.0800 -117.8800      12.5        23       182        67
WVCT   2025250     91400   17.0700 -117.9900      10.0        27       184        86
WVCT   2025250     91400   17.0100 -118.1500      11.5        22       183        87
WVCT   2025250     91400   17.0700 -118.2500      10.8       358       177        99
WVCT   2025250     91400   17.0500 -118.3100      11.5         4       176        97
WVCT   2025250     91400   17.0600 -118.4600      14.3        39       168        96
WVCT   2025250     91400   17.0200 -118.5300      13.7        36       169       100
WVCT   2025250     91400   17.0400 -118.6400      12.6        37       178        97
WVCT   2025250     91400   17.0600 -118.8000      15.2        32       183        98
WVCT   2025250     91400   17.0500 -118.8700      16.8        24       185        84
WVCT   2025250     91400   17.0300 -118.9300      17.2        26       183        83
WVCT   2025250     91400   16.9900 -119.0500      17.1        22       184        96
WVCT   2025250     91400   16.9700 -119.2400      15.8        18       175        96
WVCT   2025250     91400   16.9800 -119.3400      15.3        11       173        95
WVCT   2025250     91400   16.9600 -119.3700      15.1        12       173        95
WVCT   2025250     91400   17.0000 -119.5300      14.2         5       174        96
WVCT   2025250     91400   17.2200 -109.0300       6.7        45       172        65
WVCT   2025250     91400   17.2100 -109.1000       6.6        56       177        63
WVCT   2025250     91400   17.2100 -109.3000      10.7        69       197        98
WVCT   2025250     91400   17.2100 -109.3900      11.4        79       208        97
WVCT   2025250     91400   17.2000 -109.5100      13.0        91       208       100
WVCT   2025250     91400   17.1800 -109.6400      13.7        87       206        99
WVCT   2025250     91400   17.1800 -109.6900      12.4        85       200        90
WVCT   2025250     91400   17.1100 -109.8200       9.3        61       182        98
WVCT   2025250     91400   17.1900 -110.0200       7.2        46       173        72
WVCT   2025250     91400   17.1200 -110.1300       7.4        63       172       100
WVCT   2025250     91400   17.1800 -110.2600      12.0        75       173        75
WVCT   2025250     91400   17.1000 -110.4000       8.5        68       178       100
WVCT   2025250     91400   17.1600 -110.4100      10.9        80       175        63
WVCT   2025250     91400   17.1700 -110.6700       6.6        70       164        71
WVCT   2025250     91400   17.1600 -110.8100       6.7        89       166        71
WVCT   2025250     91400   17.0800 -110.9900       6.6        92       166        84
WVCT   2025250     91400   17.1000 -111.0100       5.9        99       164        87
WVCT   2025250     91400   17.1100 -111.2000       4.6        87       157        60
WVCT   2025250     91400   17.0900 -111.3400       7.8        79       156        67
WVCT   2025250     91400   17.1400 -111.4500       6.6        16       149        60
WVCT   2025250     91400   17.1400 -111.5700       7.1       359       130        97
WVCT   2025250     91400   17.0800 -111.7000      10.0        76       148        86
WVCT   2025250     91400   17.0600 -111.7200      10.1        73       152        91
WVCT   2025250     91400   17.0500 -111.8600       7.7        70       133        81
WVCT   2025250     91400   17.0500 -112.0000       7.8        86       141        76
WVCT   2025250     91400   17.1300 -112.0600      12.0        75       135        94
WVCT   2025250     91400   17.0400 -112.2100       5.4        40       153        70
WVCT   2025250     91400   17.0400 -112.3800       5.0        54       151        94
WVCT   2025250     91400   17.0400 -112.4200       5.5        51       149       100
WVCT   2025250     91400   17.0300 -112.8600      13.9        35       156        69
WVCT   2025250     91400   17.0200 -112.9100      14.3        27       156        64
WVCT   2025250     91400   17.0800 -113.0300      15.3        20       155        75
WVCT   2025250     91400   17.0600 -113.1800      14.4        31       154        90
WVCT   2025250     91400   17.0500 -113.2400      13.5        44       156       100
WVCT   2025250     91400   17.0100 -113.3900      16.4        62       160        99
WVCT   2025250     91400   17.0700 -113.5100       5.3       355       162        60
WVCT   2025250     91400   17.0400 -113.7200       8.4        35       160        94
WVCT   2025250     91400   17.0000 -113.8900       7.4        21       165        84
WVCT   2025250     91400   17.0000 -113.9300       7.0         5       168        91
WVCT   2025250     91400   17.0100 -114.0200       7.8       354       172        99
WVCT   2025250     91400   17.0700 -114.2100       9.3         4       171        79
WVCT   2025250     91400   16.9700 -114.9000       7.3       341       199        77
WVCT   2025250     91400   17.0400 -115.4500       5.4        39       169        92
WVCT   2025250     91400   16.9900 -115.5600       6.8        66       170        98
WVCT   2025250     91400   17.0100 -115.5800       7.0        60       171        84
WVCT   2025250     91400   17.0100 -115.7200       7.0        44       179        88
WVCT   2025250     91400   16.9400 -116.1000       9.8         3       188        94
WVCT   2025250     91400   16.9600 -116.1900       8.1        48       188        81
WVCT   2025250     91400   16.9600 -116.2500       8.3        61       189        85
WVCT   2025250     91400   16.9500 -116.4100       4.7        30       199        83
WVCT   2025250     91400   16.9300 -116.5600       7.5         1       205        90
WVCT   2025250     91400   16.9300 -116.5800       7.6         2       203        88
WVCT   2025250     91400   17.0000 -116.8600       4.8         2       182        99
WVCT   2025250     91400   16.9800 -116.9900      10.7         9       185        99
WVCT   2025250     91400   17.0000 -117.0300      10.7        11       196        99
WVCT   2025250     91400   16.9900 -117.1800      10.0        10       215        99
WVCT   2025250     91400   16.9100 -117.2400       9.9        25       213        97
WVCT   2025250     91400   16.9900 -117.3600      12.3        35       205        97
WVCT   2025250     91400   16.9100 -117.4800      10.0        26       189        75
WVCT   2025250     91400   16.9200 -117.6500       9.2         7       184        70
WVCT   2025250     91400   16.9200 -117.6700       9.3         8       184        71
WVCT   2025250     91400   16.9800 -117.9600      15.7        34       175        79
WVCT   2025250     91400   16.8900 -118.1200      15.5        59       184        92
WVCT   2025250     91400   16.9300 -118.1600      16.1        49       185        79
WVCT   2025250     91400   16.9100 -118.3300      16.1         3       184        96
WVCT   2025250     91400   16.8900 -118.3600      15.8         3       181        95
WVCT   2025250     91400   16.9000 -118.5100      14.4        24       180        91
WVCT   2025250     91400   16.8800 -118.5700      14.2        31       180        84
WVCT   2025250     91400   16.9600 -118.7500      14.3        51       181        97
WVCT   2025250     91400   16.8800 -118.8100      15.9        43       182        89
WVCT   2025250     91400   16.8700 -119.0600      14.9        23       184        96
WVCT   2025250     91400   16.8700 -119.1500      15.3        17       181       100
WVCT   2025250     91400   16.9100 -119.2900      15.5        17       172        99
WVCT   2025250     91400   16.9300 -119.3100      15.5        15       173        96
WVCT   2025250     91400   16.8600 -119.5100      13.9        10       168        96
WVCT   2025250     91400   17.1200 -109.0500       8.2        71       170        99
WVCT   2025250     91400   17.0300 -109.1700       8.6        73       174        93
WVCT   2025250     91400   17.0500 -109.3100       8.1        64       185        79
WVCT   2025250     91400   17.0700 -109.3800       8.8        80       200        87
WVCT   2025250     91400   17.1000 -109.4600      11.4        96       213        84
WVCT   2025250     91400   17.1000 -109.6800      12.7        89       198        93
WVCT   2025250     91400   17.0300 -109.7700      10.7        77       188        90
WVCT   2025250     91400   17.0700 -109.9300       9.5        61       179        99
WVCT   2025250     91400   17.0700 -109.9800       9.4        59       179       100
WVCT   2025250     91400   17.0400 -110.1700       5.4        55       173        97
WVCT   2025250     91400   17.0600 -110.1900       5.5        57       173       100
WVCT   2025250     91400   17.0200 -110.4200       5.9        60       182        94
WVCT   2025250     91400   17.0000 -110.4400       5.4        61       183        92
WVCT   2025250     91400   17.0400 -110.9800       6.8        87       167        95
WVCT   2025250     91400   17.0200 -111.0500       7.3        90       164        99
WVCT   2025250     91400   16.9700 -111.2300       8.8        87       163        97
WVCT   2025250     91400   16.9900 -111.3200      10.2        83       164       100
WVCT   2025250     91400   16.9900 -111.4100       9.8        83       165        97
WVCT   2025250     91400   16.9600 -111.5100       8.2        72       170        92
WVCT   2025250     91400   17.0400 -111.7000      10.3        72       158        85
WVCT   2025250     91400   17.0400 -111.7500       9.7        68       154        90
WVCT   2025250     91400   16.9500 -111.9100       8.9        47       156       100
WVCT   2025250     91400   17.0100 -112.0100       8.8        64       144        82
WVCT   2025250     91400   17.0300 -112.1700       9.0        55       152        86
WVCT   2025250     91400   17.0200 -112.1900       6.0        46       153        70
WVCT   2025250     91400   17.0000 -112.3600       5.7        45       153        90
WVCT   2025250     91400   16.9600 -112.5100       5.7        38       149        77
WVCT   2025250     91400   16.9600 -112.5500       5.8        38       148        74
WVCT   2025250     91400   16.9500 -112.6900      16.4        75       153        95
WVCT   2025250     91400   16.9900 -112.8000      15.4        56       156        82
WVCT   2025250     91400   16.9200 -113.0000      14.0        59       157        89
WVCT   2025250     91400   16.9200 -113.0900      11.6        52       154        98
WVCT   2025250     91400   16.9200 -113.1600      12.2        48       154        99
WVCT   2025250     91400   16.9700 -113.3300      16.6        58       158        96
WVCT   2025250     91400   16.9100 -113.3600      15.6        59       160        62
WVCT   2025250     91400   16.9700 -113.5300       5.6        46       164        81
WVCT   2025250     91400   16.9100 -113.6600       7.9        36       164        76
WVCT   2025250     91400   16.9000 -113.7900       8.3        35       162        92
WVCT   2025250     91400   16.9000 -113.8200       7.4        32       162        89
WVCT   2025250     91400   16.9800 -113.9200       6.6         5       166        92
WVCT   2025250     91400   16.9500 -114.1000       9.0       355       171        91
WVCT   2025250     91400   16.9700 -114.1400       8.8       357       171        93
WVCT   2025250     91400   16.9500 -114.3700       4.0       141       176        66
WVCT   2025250     91400   16.8700 -115.0300       7.2       339       172       100
WVCT   2025250     91400   16.9400 -115.5300       9.4        68       171        75
WVCT   2025250     91400   16.8500 -115.6300       8.7        70       178        71
WVCT   2025250     91400   16.9100 -115.7300       6.9        43       193        93
WVCT   2025250     91400   16.8400 -116.2300       7.9        29       189        76
WVCT   2025250     91400   16.9000 -116.2800       6.4        53       189        98
WVCT   2025250     91400   16.8300 -116.4500       5.2         1       207        99
WVCT   2025250     91400   16.9100 -116.5700       7.3         1       205        93
WVCT   2025250     91400   16.9100 -116.5900       7.5         2       204        90
WVCT   2025250     91400   16.8500 -116.7900       8.4         7       180        99
WVCT   2025250     91400   16.8700 -116.8100       7.7         9       180       100
WVCT   2025250     91400   16.8600 -116.9400      11.5        16       184        97
WVCT   2025250     91400   16.8400 -117.0800      14.0        21       194        98
WVCT   2025250     91400   16.8200 -117.1400      13.5        23       204       100
WVCT   2025250     91400   16.8400 -117.2500      10.3        39       208        98
WVCT   2025250     91400   16.8100 -117.5600      10.9        21       188        82
WVCT   2025250     91400   16.8100 -117.5800      10.1        20       187        72
WVCT   2025250     91400   16.8600 -117.6800       9.1        14       185        69
WVCT   2025250     91400   16.8500 -118.1700      15.6        63       184        98
WVCT   2025250     91400   16.8500 -118.2400      15.1        45       184        79
WVCT   2025250     91400   16.7900 -118.3900      11.2         4       174        99
WVCT   2025250     91400   16.8700 -118.4000      14.4         7       181        98
WVCT   2025250     91400   16.8600 -118.5800      14.2        32       180        84
WVCT   2025250     91400   16.7800 -118.6900      14.1        35       180        99
WVCT   2025250     91400   16.8000 -118.7800      14.6        43       181        66
WVCT   2025250     91400   16.7800 -118.9900      12.1        29       182        74
WVCT   2025250     91400   16.8500 -119.1300      14.5        17       182       100
WVCT   2025250     91400   16.7700 -119.2500      15.2        17       171        96
WVCT   2025250     91400   16.7700 -119.3500      16.4        17       170        99
WVCT   2025250     91400   16.8300 -119.4500      15.3        14       167        96
WVCT   2025250     91400   16.7800 -119.5600      15.3        11       168        99
WVCT   2025250     91400   16.9600 -109.0900      10.7        87       175        89
WVCT   2025250     91400   17.0100 -109.1700       9.3        77       175        96
WVCT   2025250     91400   17.0100 -109.3200       8.4        77       190        64
WVCT   2025250     91400   17.0100 -109.3700       8.1        77       192        62
WVCT   2025250     91400   16.9200 -109.6700       7.3        81       211        99
WVCT   2025250     91400   16.9900 -109.7800      11.0        75       196        97
WVCT   2025250     91400   16.9500 -109.8800      12.2        63       208        99
WVCT   2025250     91400   16.9300 -110.0100      11.2        51       208        80
WVCT   2025250     91400   16.9000 -110.1600       7.7        30       185        82
WVCT   2025250     91400   16.9000 -110.2500       7.3        38       182        79
WVCT   2025250     91400   16.9800 -110.4300       5.4        58       183        98
WVCT   2025250     91400   16.9500 -110.5200       4.2        61       183        93
WVCT   2025250     91400   16.9200 -111.0300       5.9       105       167        97
WVCT   2025250     91400   16.8800 -111.1500       7.9        95       170        89
WVCT   2025250     91400   16.8700 -111.2000       8.0        94       169        95
WVCT   2025250     91400   16.9100 -111.2900       9.6        88       168        96
WVCT   2025250     91400   16.9100 -111.4800      10.9        78       173       100
WVCT   2025250     91400   16.9400 -111.5100       8.5        71       171        96
WVCT   2025250     91400   16.8600 -111.6900       6.9        57       172        85
WVCT   2025250     91400   16.8600 -111.7900       8.4        49       168        94
WVCT   2025250     91400   16.9300 -111.8900       9.6        47       160        99
WVCT   2025250     91400   16.8900 -112.0400      11.3        42       156        92
WVCT   2025250     91400   16.8900 -112.1100      12.1        46       158        93
WVCT   2025250     91400   16.9000 -112.2200       9.3        31       159        79
WVCT   2025250     91400   16.8400 -112.5100      11.4         4       152        88
WVCT   2025250     91400   16.8400 -112.6000       9.8        28       149        80
WVCT   2025250     91400   16.8900 -112.7000      13.0        65       152        93
WVCT   2025250     91400   16.9100 -112.8200      16.9        76       157        96
WVCT   2025250     91400   16.9000 -113.0000      14.3        66       158        85
WVCT   2025250     91400   16.8200 -113.0600      12.1        76       160        81
WVCT   2025250     91400   16.8800 -113.2300       8.9        52       157        89
WVCT   2025250     91400   16.8100 -113.5600       8.4        32       168        63
WVCT   2025250     91400   16.8300 -113.7000      10.2        32       160        68
WVCT   2025250     91400   16.8400 -113.7100       8.9        34       160        77
WVCT   2025250     91400   16.8000 -113.8400       5.0        23       160        65
WVCT   2025250     91400   16.8600 -114.0500       7.6       355       165        71
WVCT   2025250     91400   16.7900 -114.2600       5.0        53       168        97
WVCT   2025250     91400   16.8100 -115.0400       7.9       354       172       100
WVCT   2025250     91400   16.7500 -116.0200       8.9        15       185        96
WVCT   2025250     91400   16.7500 -116.0700       8.0        15       185        86
WVCT   2025250     91400   16.8000 -116.2100       7.6        19       189        73
WVCT   2025250     91400   16.7400 -116.2900       8.7        16       193        99
WVCT   2025250     91400   16.7400 -116.4400      10.0         6       205        94
WVCT   2025250     91400   16.7500 -116.5000       8.5         4       209        99
WVCT   2025250     91400   16.7700 -116.6700       7.6         2       197        94
WVCT   2025250     91400   16.7500 -116.7700       8.3         1       192        85
WVCT   2025250     91400   16.7500 -116.9000      10.1        25       190        99
WVCT   2025250     91400   16.7800 -117.0200      13.9        21       190        99
WVCT   2025250     91400   16.7800 -117.0900      14.7        28       193       100
WVCT   2025250     91400   16.7200 -117.1600      14.8        37       200        98
WVCT   2025250     91400   16.7700 -117.4500      10.0        35       191        98
WVCT   2025250     91400   16.7300 -117.5500       8.8        22       187        99
WVCT   2025250     91400   16.7900 -117.5800       9.3        22       187        72
WVCT   2025250     91400   16.7000 -118.0000      11.0        51       181        76
WVCT   2025250     91400   16.7700 -118.1800      13.5        70       183        85
WVCT   2025250     91400   16.7300 -118.2300      13.2        58       180        62
WVCT   2025250     91400   16.7700 -118.4000      10.1         4       174        98
WVCT   2025250     91400   16.7300 -118.4500       8.0         8       173        99
WVCT   2025250     91400   16.7100 -118.5300       8.5        27       173        90
WVCT   2025250     91400   16.7400 -118.7200      14.6        35       179        98
WVCT   2025250     91400   16.7200 -118.7700      14.5        40       179        69
WVCT   2025250     91400   16.7000 -118.8800      10.5        33       181        65
WVCT   2025250     91400   16.6800 -118.9600      10.9         5       179        82
WVCT   2025250     91400   16.7000 -119.1100      13.8         4       175        98
WVCT   2025250     91400   16.7500 -119.2300      14.8        13       171        95
WVCT   2025250     91400   16.6900 -119.3600      15.6        16       170        97
WVCT   2025250     91400   16.7100 -119.3800      15.8        15       170        99
WVCT   2025250     91400   16.7500 -119.5200      16.6        15       168        92
WVCT   2025250     91400   16.8800 -109.1300      10.3        80       177        99
WVCT   2025250     91400   16.8700 -109.2000      11.6        84       188        98
WVCT   2025250     91400   16.9100 -109.3100      12.7        95       192        99
WVCT   2025250     91400   16.8500 -109.4300      17.2        98       191        74
WVCT   2025250     91400   16.9000 -109.6800       6.7        77       211        97
WVCT   2025250     91400   16.8100 -109.8600       8.8        49       199        86
WVCT   2025250     91400   16.8300 -109.8800      10.5        50       200        96
WVCT   2025250     91400   16.8900 -110.0200      11.4        44       198        86
WVCT   2025250     91400   16.8400 -110.1700       8.7        39       186        93
WVCT   2025250     91400   16.8000 -110.3400       9.9        67       186        97
WVCT   2025250     91400   16.8200 -110.3600       9.7        68       184       100
WVCT   2025250     91400   16.8800 -110.4700       6.1        67       183       100
WVCT   2025250     91400   16.8400 -111.1400       7.3        94       172        74
WVCT   2025250     91400   16.7700 -111.2400       7.1        92       174        78
WVCT   2025250     91400   16.8100 -111.3300       9.6        98       173        99
WVCT   2025250     91400   16.7700 -111.4300      12.0        99       175        95
WVCT   2025250     91400   16.8200 -111.6100       7.0        68       175        72
WVCT   2025250     91400   16.8000 -111.7100       7.8        70       174        96
WVCT   2025250     91400   16.8400 -111.8100       9.0        51       170        87
WVCT   2025250     91400   16.8100 -111.9100       8.8        34       168        62
WVCT   2025250     91400   16.7400 -112.3400      13.2       328       158        80
WVCT   2025250     91400   16.7400 -112.4600      15.0       358       150        98
WVCT   2025250     91400   16.7600 -112.5000      15.4         6       149        99
WVCT   2025250     91400   16.7900 -112.6300      12.6        33       149        92
WVCT   2025250     91400   16.7700 -112.7000      14.4        46       151        97
WVCT   2025250     91400   16.7300 -112.9000      19.0        56       161        85
WVCT   2025250     91400   16.7800 -113.0000      16.4        66       165        82
WVCT   2025250     91400   16.8000 -113.1100      11.0        72       161        82
WVCT   2025250     91400   16.7800 -113.2500       9.9        54       166        83
WVCT   2025250     91400   16.7100 -113.4900      13.6        27       168       100
WVCT   2025250     91400   16.7100 -113.6000      13.2        25       162        92
WVCT   2025250     91400   16.7300 -113.6700      12.7        26       150        83
WVCT   2025250     91400   16.7000 -113.8100       9.4        26       163        81
WVCT   2025250     91400   16.7800 -113.8400       5.3        23       160        66
WVCT   2025250     91400   16.7600 -114.0700       5.3       342       164        64
WVCT   2025250     91400   16.6700 -115.1800       4.6        20       169        97
WVCT   2025250     91400   16.6700 -115.2000       4.2        28       169        97
WVCT   2025250     91400   16.7000 -115.6400      12.3        37       176        64
WVCT   2025250     91400   16.7300 -115.7600       8.5        32       191        85
WVCT   2025250     91400   16.7300 -115.8500       7.9        22       191        97
WVCT   2025250     91400   16.6700 -116.0100       9.6        27       184        77
WVCT   2025250     91400   16.6900 -116.1000       8.3        22       185        87
WVCT   2025250     91400   16.7200 -116.2700       8.7        17       193        98
WVCT   2025250     91400   16.6600 -116.4700      12.3        11       190        94
WVCT   2025250     91400   16.6300 -116.6100       8.4         9       197        91
WVCT   2025250     91400   16.7100 -116.6400       7.4         2       200        92
WVCT   2025250     91400   16.7100 -116.8100       9.3         1       196        93
WVCT   2025250     91400   16.7100 -116.8800       9.9        18       196        99
WVCT   2025250     91400   16.6800 -117.0100      12.6        32       196        98
WVCT   2025250     91400   16.6600 -117.1000      13.9        40       200        90
WVCT   2025250     91400   16.6800 -117.3200      12.8        31       193       100
WVCT   2025250     91400   16.6100 -117.4600       9.7        27       183        77
WVCT   2025250     91400   16.6500 -117.5200       8.2        25       180        85
WVCT   2025250     91400   16.6100 -117.6500       7.0        24       180        75
WVCT   2025250     91400   16.6600 -118.0700      11.0        44       181        63
WVCT   2025250     91400   16.6000 -118.2100      10.6        43       174        75
WVCT   2025250     91400   16.6200 -118.3100       6.8        29       172        72
WVCT   2025250     91400   16.5900 -118.4200       7.3        17       171        99
WVCT   2025250     91400   16.5900 -118.4400       7.9        15       171        99
WVCT   2025250     91400   16.6100 -118.5500      11.5        27       173        86
WVCT   2025250     91400   16.5900 -118.7400      18.4        39       177        93
WVCT   2025250     91400   16.6100 -118.7600      17.6        36       177        90
WVCT   2025250     91400   16.6000 -118.9100      14.6       358       178        97
WVCT   2025250     91400   16.6000 -119.0000      15.8       349       176       100
WVCT   2025250     91400   16.6600 -119.1600      15.8         7       173       100
WVCT   2025250     91400   16.6400 -119.1800      16.1         8       172       100
WVCT   2025250     91400   16.5700 -119.3200      14.1         9       171        98
WVCT   2025250     91400   16.5700 -119.4900      13.8        13       165        92
WVCT   2025250     91400   16.5900 -119.5700      13.4        16       163        93
WVCT   2025250     91400   16.7700 -109.2000      10.8        84       187       100
WVCT   2025250     91400   16.8100 -109.3400      15.9        95       190        98
WVCT   2025250     91400   16.7800 -109.6300       7.5        58       204        60
WVCT   2025250     91400   16.8000 -109.7200       5.2        58       205        61
WVCT   2025250     91400   16.7900 -109.8900       9.2        45       198        83
WVCT   2025250     91400   16.7900 -110.0400      11.8        49       194       100
WVCT   2025250     91400   16.7000 -110.2500       9.7        77       190        80
WVCT   2025250     91400   16.7800 -110.3000       9.1        68       189        95
WVCT   2025250     91400   16.6800 -110.9300       4.0        83       175       100
WVCT   2025250     91400   16.7600 -110.9900       5.2        73       173        63
WVCT   2025250     91400   16.7400 -111.0900       8.5        75       175        80
WVCT   2025250     91400   16.7500 -111.2300       7.6        87       175        75
WVCT   2025250     91400   16.7500 -111.3900      10.5       108       176        91
WVCT   2025250     91400   16.7100 -111.4400      11.4       119       177        85
WVCT   2025250     91400   16.7200 -111.7200       8.2        73       176        92
WVCT   2025250     91400   16.6800 -111.8500       7.8        22       175        61
WVCT   2025250     91400   16.6800 -111.9200       8.5         6       173        60
WVCT   2025250     91400   16.6600 -112.3600      10.7       331       156        74
WVCT   2025250     91400   16.7200 -112.4400      14.0       354       152        97
WVCT   2025250     91400   16.7200 -112.5500      16.1        14       144        96
WVCT   2025250     91400   16.6600 -112.6800      13.3        45       150        94
WVCT   2025250     91400   16.7100 -112.7200      16.7        40       151        84
WVCT   2025250     91400   16.7100 -112.9200      19.3        52       162        79
WVCT   2025250     91400   16.6900 -112.9500      19.5        48       163        73
WVCT   2025250     91400   16.6600 -113.0700      17.5        36       167        95
WVCT   2025250     91400   16.6200 -113.2800      16.3        21       166        93
WVCT   2025250     91400   16.6200 -113.3000      17.1        25       166        93
WVCT   2025250     91400   16.6900 -113.4900      14.6        26       167       100
WVCT   2025250     91400   16.6900 -113.6100      14.1        26       162        98
WVCT   2025250     91400   16.6500 -113.7300      15.3        31       160        99
WVCT   2025250     91400   16.6700 -113.7500      14.1        30       159        98
WVCT   2025250     91400   16.6500 -114.2700      19.1        36       172        99
WVCT   2025250     91400   16.6700 -114.3800       8.3        38       178        85
WVCT   2025250     91400   16.6000 -114.6800       6.3        10       189        61
WVCT   2025250     91400   16.6400 -114.9400      11.4        10       170        64
WVCT   2025250     91400   16.6300 -114.9800      11.8         9       169        63
WVCT   2025250     91400   16.6500 -115.1800       4.2        24       169        87
WVCT   2025250     91400   16.5800 -115.6300      12.4        41       174        80
WVCT   2025250     91400   16.5600 -115.7700      13.9        38       173        93
WVCT   2025250     91400   16.5500 -115.9000      11.2        28       175        92
WVCT   2025250     91400   16.5700 -116.0700       9.9        14       182        80
WVCT   2025250     91400   16.5500 -116.1000      10.4        13       180        88
WVCT   2025250     91400   16.5500 -116.2300      10.2         9       180        97
WVCT   2025250     91400   16.6000 -116.4800      12.6        11       190        99
WVCT   2025250     91400   16.6000 -116.5700      10.4        10       200        93
WVCT   2025250     91400   16.5700 -116.7300       8.2       359       204        86
WVCT   2025250     91400   16.5500 -116.7500       9.0         1       204        96
WVCT   2025250     91400   16.5500 -116.8600       8.9         5       204        96
WVCT   2025250     91400   16.5500 -117.0100       9.4        23       204       100
WVCT   2025250     91400   16.5300 -117.0800       9.7        23       204        89
WVCT   2025250     91400   16.6000 -117.2600      12.4        28       194        85
WVCT   2025250     91400   16.5600 -117.3100      12.7        27       190        92
WVCT   2025250     91400   16.5200 -117.4900      12.1        24       182        70
WVCT   2025250     91400   16.5700 -117.5300       9.7        25       180        67
WVCT   2025250     91400   16.5900 -117.6800       7.6        25       180        90
WVCT   2025250     91400   16.5700 -117.7200       8.3        28       182        91
WVCT   2025250     91400   16.5100 -117.8400       8.1        18       183        70
WVCT   2025250     91400   16.5800 -118.0200       9.2        28       182        95
WVCT   2025250     91400   16.5400 -118.0900       9.8        19       181        91
WVCT   2025250     91400   16.5800 -118.1900      10.6        37       176        80
WVCT   2025250     91400   16.5800 -118.3000       8.1        32       171        71
WVCT   2025250     91400   16.5300 -118.4100       7.7        25       172        91
WVCT   2025250     91400   16.5300 -118.5600      14.9        36       181        92
WVCT   2025250     91400   16.5300 -118.6700      18.6        41       181        99
WVCT   2025250     91400   16.5100 -118.6900      18.9        41       182        99
WVCT   2025250     91400   16.5300 -118.8200      18.1        28       181       100
WVCT   2025250     91400   16.5600 -118.8900      16.0         6       178        99
WVCT   2025250     91400   16.5200 -119.0100      18.9       356       174        99
WVCT   2025250     91400   16.5400 -119.1100      18.4         1       173        91
WVCT   2025250     91400   16.5000 -119.2400      17.6         7       170        98
WVCT   2025250     91400   16.5100 -119.4100      14.0        10       168        96
WVCT   2025250     91400   16.5300 -119.4300      13.4        10       166        97
WVCT   2025250     91400   16.6600 -109.1800       7.5       105       198        86
WVCT   2025250     91400   16.6700 -109.2500      10.0        93       196        98
WVCT   2025250     91400   16.6900 -109.3900      15.7        89       190        71
WVCT   2025250     91400   16.7000 -109.5500      11.3        62       192        61
WVCT   2025250     91400   16.6500 -109.8700       6.4        26       190        78
WVCT   2025250     91400   16.6100 -110.0300      12.4        54       189        97
WVCT   2025250     91400   16.6700 -110.0600      12.8        63       190        96
WVCT   2025250     91400   16.6800 -110.2000      10.0        73       190        87
WVCT   2025250     91400   16.6800 -110.3200       9.6        70       191        68
WVCT   2025250     91400   16.5800 -111.0700       5.8        98       177        83
WVCT   2025250     91400   16.6000 -111.1400       9.4        85       177       100
WVCT   2025250     91400   16.5800 -111.2400      11.9        90       178        90
WVCT   2025250     91400   16.6100 -111.3900       7.4       121       179        88
WVCT   2025250     91400   16.5900 -111.4700       5.5       138       179        67
WVCT   2025250     91400   16.5600 -111.7500      12.5       342       176        89
WVCT   2025250     91400   16.5600 -111.8700      11.5       359       173        94
WVCT   2025250     91400   16.6300 -112.1300       5.8       315       168        69
WVCT   2025250     91400   16.6300 -112.1800       6.5       308       167        62
WVCT   2025250     91400   16.5500 -112.3600       6.3       324       160        68
WVCT   2025250     91400   16.5400 -112.4300       6.4       345       155        93
WVCT   2025250     91400   16.6100 -112.7800       9.7        68       158        75
WVCT   2025250     91400   16.5500 -112.9700      18.0        56       165        97
WVCT   2025250     91400   16.5800 -113.1700      14.3         8       168        99
WVCT   2025250     91400   16.6000 -113.2200      14.9         3       167        88
WVCT   2025250     91400   16.5400 -113.3900      17.3        32       164        99
WVCT   2025250     91400   16.5300 -113.5200      12.6        36       166        99
WVCT   2025250     91400   16.5100 -113.5900       8.5        41       167        80
WVCT   2025250     91400   16.5500 -113.6500      12.0        38       165        79
WVCT   2025250     91400   16.5800 -113.8500      10.4        26       172        86
WVCT   2025250     91400   16.5800 -113.9400       5.9        20       171        91
WVCT   2025250     91400   16.5200 -114.2700      13.7        34       176        80
WVCT   2025250     91400   16.5000 -114.7400       7.0         3       178        80
WVCT   2025250     91400   16.5400 -114.8400       8.9         3       172        99
WVCT   2025250     91400   16.5600 -114.8900       9.7         5       171        92
WVCT   2025250     91400   16.4800 -115.0500       7.0        24       168        97
WVCT   2025250     91400   16.5200 -115.6400      11.7        37       173        98
WVCT   2025250     91400   16.5200 -115.7300      14.3        40       173        89
WVCT   2025250     91400   16.4800 -115.8300      13.2        41       172        96
WVCT   2025250     91400   16.4500 -115.9600      10.7        27       172        69
WVCT   2025250     91400   16.4700 -116.0900      10.1        18       175        82
WVCT   2025250     91400   16.4500 -116.1200      10.0        18       175        78
WVCT   2025250     91400   16.4500 -116.2900      11.5         5       180        97
WVCT   2025250     91400   16.4800 -116.3500      12.2         9       182       100
WVCT   2025250     91400   16.5200 -116.5200      12.8        10       192       100
WVCT   2025250     91400   16.5000 -116.5400      12.6        11       201        98
WVCT   2025250     91400   16.4400 -116.6800      12.9         2       208       100
WVCT   2025250     91400   16.4500 -116.8500      10.0         7       204       100
WVCT   2025250     91400   16.4500 -116.9600      10.6        17       202        94
WVCT   2025250     91400   16.4500 -116.9900      10.5        16       202        94
WVCT   2025250     91400   16.4900 -117.1100       9.8        18       203        93
WVCT   2025250     91400   16.4600 -117.2000      10.1        13       194        85
WVCT   2025250     91400   16.5000 -117.5200      12.6        24       182        66
WVCT   2025250     91400   16.4300 -117.7200       7.9        36       183        72
WVCT   2025250     91400   16.4300 -117.7400       6.4        25       183        62
WVCT   2025250     91400   16.4500 -117.8900       7.1        18       184        63
WVCT   2025250     91400   16.4100 -118.0500       8.0         7       178        71
WVCT   2025250     91400   16.4400 -118.0600       8.4         2       178        70
WVCT   2025250     91400   16.4000 -118.1900       8.1        15       173        88
WVCT   2025250     91400   16.4000 -118.3200       8.6        44       171        86
WVCT   2025250     91400   16.4800 -118.4000       7.6        39       172        78
WVCT   2025250     91400   16.4400 -118.4900      11.5        35       176        88
WVCT   2025250     91400   16.4700 -118.6500      18.5        43       184        99
WVCT   2025250     91400   16.4100 -118.7300      17.8        42       187       100
WVCT   2025250     91400   16.4700 -118.8700      18.1        24       182       100
WVCT   2025250     91400   16.4100 -118.9400      17.7        25       180        95
WVCT   2025250     91400   16.4200 -119.0600      18.4         1       172       100
WVCT   2025250     91400   16.4000 -119.1900      18.3         5       167        99
WVCT   2025250     91400   16.4200 -119.2700      17.6         4       169        97
WVCT   2025250     91400   16.4000 -119.3400      16.6         7       169        93
WVCT   2025250     91400   16.4500 -119.4600      14.3        10       168        87
WVCT   2025250     91400   16.6200 -109.0900       6.4       121       198        63
WVCT   2025250     91400   16.6100 -109.2100       7.7       105       199        86
WVCT   2025250     91400   16.5700 -109.3600       9.7        38       194        64
WVCT   2025250     91400   16.5500 -109.5600       8.9        35       189        95
WVCT   2025250     91400   16.5600 -109.6100       8.8        38       189        91
WVCT   2025250     91400   16.6000 -109.7900       5.0        35       188        90
WVCT   2025250     91400   16.5200 -109.8600       6.9        45       188        95
WVCT   2025250     91400   16.5100 -109.9800      10.3        52       188        97
WVCT   2025250     91400   16.5500 -110.1400      11.3        73       189       100
WVCT   2025250     91400   16.5500 -110.1800      10.1        75       189        93
WVCT   2025250     91400   16.5400 -110.4200       7.0        55       191        67
WVCT   2025250     91400   16.5400 -111.1000       6.4       107       177        96
WVCT   2025250     91400   16.5600 -111.1200       8.0       100       177        99
WVCT   2025250     91400   16.5600 -111.2400      11.7        90       178        82
WVCT   2025250     91400   16.5200 -111.7400      14.1       338       176        92
WVCT   2025250     91400   16.5000 -111.9300      10.6         9       173        81
WVCT   2025250     91400   16.4800 -111.9500       9.9        19       172        74
WVCT   2025250     91400   16.5300 -112.1100       6.3         8       168        69
WVCT   2025250     91400   16.5300 -112.2000       4.9       323       167        88
WVCT   2025250     91400   16.5300 -112.3800       5.6       337       158        87
WVCT   2025250     91400   16.5200 -112.4500       6.0       357       155        89
WVCT   2025250     91400   16.5100 -112.8900       9.9        67       161        68
WVCT   2025250     91400   16.4300 -113.0000      16.5        47       167        65
WVCT   2025250     91400   16.4500 -113.1500      12.2        10       167        86
WVCT   2025250     91400   16.4200 -113.3200      15.4        32       166        94
WVCT   2025250     91400   16.4400 -113.4300      17.5        44       166        97
WVCT   2025250     91400   16.4200 -113.4500      17.6        47       167        96
WVCT   2025250     91400   16.4100 -113.7200      20.7        30       172        77
WVCT   2025250     91400   16.4500 -113.8100      21.4        35       173        81
WVCT   2025250     91400   16.4000 -114.1100      20.0        36       176        99
WVCT   2025250     91400   16.4200 -114.1300      18.8        39       176        85
WVCT   2025250     91400   16.4800 -114.2500      13.8        36       176        90
WVCT   2025250     91400   16.3900 -114.7100       7.1        10       180        72
WVCT   2025250     91400   16.4000 -114.8000       6.2       360       177        92
WVCT   2025250     91400   16.3800 -114.9800       5.5        26       169        64
WVCT   2025250     91400   16.3800 -115.1400       8.7        31       170        89
WVCT   2025250     91400   16.3700 -115.2700       9.3        14       178        78
WVCT   2025250     91400   16.4100 -115.4400       9.0        14       174        85
WVCT   2025250     91400   16.4400 -115.5500       9.5        26       174        94
WVCT   2025250     91400   16.4400 -115.5900       9.5        26       173        90
WVCT   2025250     91400   16.4200 -115.6800       9.3        31       171        86
WVCT   2025250     91400   16.4200 -115.8800      12.6        44       171        91
WVCT   2025250     91400   16.3900 -115.9900      10.9        32       171        69
WVCT   2025250     91400   16.3500 -116.0400      10.8        37       171        73
WVCT   2025250     91400   16.3500 -116.1700       9.6        17       169        68
WVCT   2025250     91400   16.3500 -116.2400      10.5        10       169        72
WVCT   2025250     91400   16.4000 -116.3600      12.7        10       178        99
WVCT   2025250     91400   16.4000 -116.7300      12.2         4       208       100
WVCT   2025250     91400   16.3700 -116.8700      11.1         7       189        98
WVCT   2025250     91400   16.3500 -116.9100      11.4         7       188        99
WVCT   2025250     91400   16.3300 -117.1500      12.5        21       201        86
WVCT   2025250     91400   16.3200 -117.3100      13.1         7       193        78
WVCT   2025250     91400   16.3400 -117.4300      12.3         1       185        99
WVCT   2025250     91400   16.3200 -117.6300      18.3        56       187        72
WVCT   2025250     91400   16.3400 -117.6900      12.9        55       186        86
WVCT   2025250     91400   16.3100 -118.0600       6.4        14       174        70
WVCT   2025250     91400   16.3100 -118.1200       6.1         6       173        68
WVCT   2025250     91400   16.3400 -118.2000       7.7        20       172        71
WVCT   2025250     91400   16.3200 -118.3600      10.6        41       177        94
WVCT   2025250     91400   16.3200 -118.4200      11.2        48       178        72
WVCT   2025250     91400   16.3500 -118.5800      16.0        45       180        95
WVCT   2025250     91400   16.3300 -118.6100      16.2        43       183       100
WVCT   2025250     91400   16.3500 -118.7500      17.1        40       188        97
WVCT   2025250     91400   16.3100 -118.8900      16.8        37       185        98
WVCT   2025250     91400   16.3100 -118.9900      16.7        32       181        99
WVCT   2025250     91400   16.2900 -119.0400      16.3        27       178        99
WVCT   2025250     91400   16.2800 -119.1700      16.4        15       165        95
WVCT   2025250     91400   16.2800 -119.3100      17.4        21       166       100
WVCT   2025250     91400   16.3000 -119.4200      17.4        22       167        99
WVCT   2025250     91400   16.2800 -119.5000      18.4        31       167        94
WVCT   2025250     91400   16.2700 -119.5900      18.3        33       171        97
WVCT   2025250     91400   16.5100 -109.5500       9.0        40       189        98
WVCT   2025250     91400   16.4200 -109.6800       8.9        73       188        98
WVCT   2025250     91400   16.4800 -109.7000       8.1        63       188        96
WVCT   2025250     91400   16.5000 -109.8100       6.0        52       188        95
WVCT   2025250     91400   16.4500 -109.9900       8.2        57       190        99
WVCT   2025250     91400   16.4700 -110.0600      10.7        65       190        91
WVCT   2025250     91400   16.4700 -110.2500      10.6        86       191        91
WVCT   2025250     91400   16.4400 -110.3000      10.9        89       192        87
WVCT   2025250     91400   16.4600 -110.4100       8.7        68       193        90
WVCT   2025250     91400   16.4000 -110.6400       5.8       342       200        93
WVCT   2025250     91400   16.4100 -110.7100       4.6       339       198        79
WVCT   2025250     91400   16.3800 -111.2100       6.6        91       184        62
WVCT   2025250     91400   16.4400 -111.2400       7.9        98       183        62
WVCT   2025250     91400   16.3800 -111.9700      10.5        43       173        87
WVCT   2025250     91400   16.3600 -112.0500       9.4        54       172        94
WVCT   2025250     91400   16.3400 -112.6500      16.1        40       166        80
WVCT   2025250     91400   16.3400 -112.7400      17.7        40       164        83
WVCT   2025250     91400   16.3500 -112.8700      20.3        44       165        99
WVCT   2025250     91400   16.3700 -112.9200      19.3        43       166        99
WVCT   2025250     91400   16.3500 -113.1500      13.1        10       168        99
WVCT   2025250     91400   16.4000 -113.3000      14.0        27       166        95
WVCT   2025250     91400   16.4000 -113.4600      17.7        48       167        94
WVCT   2025250     91400   16.3800 -113.5300      19.1        41       169        81
WVCT   2025250     91400   16.3300 -113.6700      18.8        24       169        71
WVCT   2025250     91400   16.3700 -113.7800      19.6        35       173        83
WVCT   2025250     91400   16.3500 -113.8700      14.0        38       174        78
WVCT   2025250     91400   16.3500 -113.9600      11.2        35       175        99
WVCT   2025250     91400   16.3200 -114.1700      21.2        32       180       100
WVCT   2025250     91400   16.3100 -114.6800       5.9         9       178        62
WVCT   2025250     91400   16.3700 -114.7200       6.0         1       180        99
WVCT   2025250     91400   16.3000 -114.9100       6.4        32       170        74
WVCT   2025250     91400   16.3600 -114.9600       5.5        33       170        69
WVCT   2025250     91400   16.3400 -115.1000       8.2        32       171        74
WVCT   2025250     91400   16.3100 -115.2100       9.5        17       178        82
WVCT   2025250     91400   16.3100 -115.3500      10.0         6       175        96
WVCT   2025250     91400   16.3500 -115.4700      10.4        12       173        89
WVCT   2025250     91400   16.2700 -115.6000      11.2        21       169        68
WVCT   2025250     91400   16.2800 -115.8100      11.4        52       171        82
WVCT   2025250     91400   16.3400 -115.9100      13.5        47       171        88
WVCT   2025250     91400   16.3100 -116.0300      11.0        39       170        78
WVCT   2025250     91400   16.3300 -116.0500      10.6        38       170        75
WVCT   2025250     91400   16.3300 -116.1800       9.4        17       168        68
WVCT   2025250     91400   16.3300 -116.2700      10.7         9       167        76
WVCT   2025250     91400   16.2500 -116.3900      12.3        11       166        82
WVCT   2025250     91400   16.2400 -116.5200      14.7        11       169        97
WVCT   2025250     91400   16.3100 -116.9000      11.1         5       184        99
WVCT   2025250     91400   16.2900 -116.9200      11.0         3       183       100
WVCT   2025250     91400   16.3100 -117.1400      12.3        21       199        83
WVCT   2025250     91400   16.3000 -117.4000      12.1         2       186       100
WVCT   2025250     91400   16.3000 -117.4600      11.0         6       185        98
WVCT   2025250     91400   16.2400 -117.6200      19.5        47       186        64
WVCT   2025250     91400   16.2200 -117.6900      19.9        47       186        64
WVCT   2025250     91400   16.2100 -117.9700       8.6         8       183        95
WVCT   2025250     91400   16.2900 -118.0000       6.0        18       177        83
WVCT   2025250     91400   16.2900 -118.1900       7.3         9       173        71
WVCT   2025250     91400   16.2000 -118.3100      11.1        26       180        81
WVCT   2025250     91400   16.2800 -118.4000      11.1        44       180        79
WVCT   2025250     91400   16.2000 -118.5000       8.8        38       181        62
WVCT   2025250     91400   16.2000 -118.6300      12.9        24       182        80
WVCT   2025250     91400   16.2300 -118.7100      15.6        27       186        74
WVCT   2025250     91400   16.2100 -118.8400      15.8        30       185        85
WVCT   2025250     91400   16.1900 -118.8800      15.7        32       183        96
WVCT   2025250     91400   16.1900 -118.9700      16.4        35       180       100
WVCT   2025250     91400   16.2500 -119.1300      16.0        18       172        99
WVCT   2025250     91400   16.2300 -119.1700      16.4        17       168        99
WVCT   2025250     91400   16.1800 -119.3500      17.8        30       165        99
WVCT   2025250     91400   16.2600 -119.4600      18.1        26       166        90
WVCT   2025250     91400   16.2600 -119.5100      18.6        32       167        94
WVCT   2025250     91400   16.2200 -119.6000      19.2        37       189        92
WVCT   2025250     91400   16.3700 -109.5500       7.2        79       188        65
WVCT   2025250     91400   16.4000 -109.7600       8.3        67       189        99
WVCT   2025250     91400   16.3800 -109.9300       7.9        45       200        98
WVCT   2025250     91400   16.3300 -110.0600       7.7        68       199        63
WVCT   2025250     91400   16.3900 -110.1700      12.2        96       197        97
WVCT   2025250     91400   16.3100 -110.3300      14.7        86       199        95
WVCT   2025250     91400   16.3800 -110.4500       9.9        48       196        96
WVCT   2025250     91400   16.3200 -110.5900       9.3         8       201        82
WVCT   2025250     91400   16.3600 -110.6500       6.8       357       200        94
WVCT   2025250     91400   16.3700 -110.7400       5.0         2       198        89
WVCT   2025250     91400   16.3500 -110.9100       4.8        64       184        78
WVCT   2025250     91400   16.3200 -111.3800       7.7        44       183        60
WVCT   2025250     91400   16.2800 -111.9200       9.4        60       173        92
WVCT   2025250     91400   16.3400 -112.0000      11.0        54       173        95
WVCT   2025250     91400   16.3000 -112.0800      10.6        55       172        74
WVCT   2025250     91400   16.3000 -112.6100      11.5        39       166        99
WVCT   2025250     91400   16.3200 -112.7200      17.7        40       165        78
WVCT   2025250     91400   16.3200 -112.8100      19.3        44       165        91
WVCT   2025250     91400   16.2600 -112.8700      21.9        49       167        93
WVCT   2025250     91400   16.2900 -113.1100       7.7       345       170        62
WVCT   2025250     91400   16.2200 -113.6500      16.8        35       168        94
WVCT   2025250     91400   16.2500 -113.7500      12.2        38       173        77
WVCT   2025250     91400   16.2700 -113.7700      13.1        39       173        79
WVCT   2025250     91400   16.2300 -113.9100      13.7        33       174        98
WVCT   2025250     91400   16.2400 -114.0900      14.6        28       177        62
WVCT   2025250     91400   16.2600 -114.1100      15.3        27       177        62
WVCT   2025250     91400   16.2100 -114.6600       8.1        25       182        68
WVCT   2025250     91400   16.2500 -114.6700       6.9        18       179        66
WVCT   2025250     91400   16.2100 -114.8800       8.5        31       172        91
WVCT   2025250     91400   16.2200 -114.9000       8.7        34       171        90
WVCT   2025250     91400   16.2100 -115.3000       9.2         8       177        85
WVCT   2025250     91400   16.1900 -115.6500      11.5        29       168        66
WVCT   2025250     91400   16.1900 -115.7000      11.6        30       168        60
WVCT   2025250     91400   16.2200 -115.8500      11.6        38       173        63
WVCT   2025250     91400   16.2400 -115.9500      11.8        42       173        87
WVCT   2025250     91400   16.2200 -116.0400      10.1        35       170        81
WVCT   2025250     91400   16.2300 -116.1900       9.0         9       167        83
WVCT   2025250     91400   16.2300 -116.2400       9.8         8       166        81
WVCT   2025250     91400   16.2300 -116.4100      12.7        13       166        81
WVCT   2025250     91400   16.2100 -116.5200      14.5        13       167        96
WVCT   2025250     91400   16.2200 -116.5400      14.3        12       168        99
WVCT   2025250     91400   16.1400 -116.6900      13.4        14       173        88
WVCT   2025250     91400   16.1400 -116.8400      11.8         7       177       100
WVCT   2025250     91400   16.2000 -116.9600      10.3         9       181       100
WVCT   2025250     91400   16.1900 -116.9800      10.2        10       182       100
WVCT   2025250     91400   16.1900 -117.0900      11.0        12       189        95
WVCT   2025250     91400   16.1300 -117.3600      14.5         3       188        98
WVCT   2025250     91400   16.1900 -117.4100      13.0         5       187        74
WVCT   2025250     91400   16.1200 -117.6200      16.2        17       177        88
WVCT   2025250     91400   16.2000 -117.7100      18.2        35       184        71
WVCT   2025250     91400   16.1400 -117.8100      16.9        16       174        96
WVCT   2025250     91400   16.1200 -117.8500      16.7        11       173        98
WVCT   2025250     91400   16.1500 -117.9700      12.7         4       180       100
WVCT   2025250     91400   16.1300 -118.1100      12.6         6       186        67
WVCT   2025250     91400   16.1900 -118.2000       7.7        10       181        85
WVCT   2025250     91400   16.1800 -118.3300      11.3        26       180        74
WVCT   2025250     91400   16.1800 -118.4600       8.8        30       180        69
WVCT   2025250     91400   16.1000 -118.5800      10.8        25       181        93
WVCT   2025250     91400   16.1000 -118.6000      11.5        24       181        92
WVCT   2025250     91400   16.1600 -118.7400      14.8        20       183        81
WVCT   2025250     91400   16.1700 -118.8900      15.5        31       181        97
WVCT   2025250     91400   16.1700 -118.9100      15.8        32       181        98
WVCT   2025250     91400   16.0900 -119.0200      15.7        25       177        99
WVCT   2025250     91400   16.1300 -119.1200      16.1        21       174        97
WVCT   2025250     91400   16.1400 -119.3100      16.7        26       166        99
WVCT   2025250     91400   16.1200 -119.4000      18.2        32       167       100
WVCT   2025250     91400   16.1000 -119.4400      18.7        34       174       100
WVCT   2025250     91400   16.1200 -119.5500      19.1        36       184        99
WVCT   2025250     91400   16.2300 -109.6300       6.7       295       198        73
WVCT   2025250     91400   16.2200 -109.9400      12.5        24       197        88
WVCT   2025250     91400   16.2500 -110.1300       7.5        72       200        62
WVCT   2025250     91400   16.2400 -110.4800       9.3        15       200        65
WVCT   2025250     91400   16.2800 -110.6200       8.4         6       201        71
WVCT   2025250     91400   16.2300 -110.7400       8.0        32       201        76
WVCT   2025250     91400   16.2100 -110.8400      10.9        46       199        78
WVCT   2025250     91400   16.2500 -111.4900       7.4        59       182        64
WVCT   2025250     91400   16.2500 -111.5800       5.1        96       181        97
WVCT   2025250     91400   16.2200 -111.8400       4.7        84       173        68
WVCT   2025250     91400   16.2400 -111.9800      10.8        56       173        72
WVCT   2025250     91400   16.1600 -112.1100      12.4        49       174        69
WVCT   2025250     91400   16.2300 -112.2100      14.7        46       171        60
WVCT   2025250     91400   16.1700 -112.2900      15.0        36       171        61
WVCT   2025250     91400   16.1900 -112.5900       7.4        62       169        92
WVCT   2025250     91400   16.1400 -112.7100      12.3        60       170        92
WVCT   2025250     91400   16.2200 -112.7800      17.6        51       168        63
WVCT   2025250     91400   16.2200 -112.8800      22.7        54       167        88
WVCT   2025250     91400   16.1500 -113.2700       6.3       165       172        63
WVCT   2025250     91400   16.2000 -113.3300       4.2       131       171        72
WVCT   2025250     91400   16.2000 -113.6000      14.8        32       168        91
WVCT   2025250     91400   16.1200 -113.6400      19.2        43       169        97
WVCT   2025250     91400   16.1100 -114.0700      17.6        39       173        77
WVCT   2025250     91400   16.1900 -114.0800      15.1        35       175        64
WVCT   2025250     91400   16.1700 -114.8400       7.8        21       177        99
WVCT   2025250     91400   16.1500 -115.5300      10.4        13       170        79
WVCT   2025250     91400   16.1100 -115.7300      12.8        30       170        78
WVCT   2025250     91400   16.0600 -115.8500      11.3        20       172        95
WVCT   2025250     91400   16.0600 -115.8900      11.2        13       172        96
WVCT   2025250     91400   16.1200 -116.0600       9.6        16       171        69
WVCT   2025250     91400   16.0600 -116.1300      10.7        18       170        84
WVCT   2025250     91400   16.1000 -116.2100       9.8        13       171        86
WVCT   2025250     91400   16.0700 -116.3300      11.4        15       171        99
WVCT   2025250     91400   16.0700 -116.4400      13.1        22       169       100
WVCT   2025250     91400   16.0900 -116.6100      14.1        25       166        93
WVCT   2025250     91400   16.0900 -116.6300      13.9        24       167        91
WVCT   2025250     91400   16.0400 -116.8300      12.3         1       184        98
WVCT   2025250     91400   16.0800 -116.8500      12.0       360       181       100
WVCT   2025250     91400   16.0800 -117.0000      11.5        15       186        99
WVCT   2025250     91400   16.0600 -117.0900      12.4        16       188       100
WVCT   2025250     91400   16.0500 -117.2000      12.1         6       188        93
WVCT   2025250     91400   16.1100 -117.3400      14.3         1       188        97
WVCT   2025250     91400   16.0500 -117.3900      14.2         1       187        99
WVCT   2025250     91400   16.1000 -117.5800      16.7         9       177        94
WVCT   2025250     91400   16.0400 -117.6900      15.9        16       175        93
WVCT   2025250     91400   16.0600 -117.8000      17.1         9       173        97
WVCT   2025250     91400   16.0400 -117.8200      16.7         6       172        98
WVCT   2025250     91400   16.0200 -117.9900      17.6        12       174        95
WVCT   2025250     91400   16.0100 -118.1200      17.5        21       184        77
WVCT   2025250     91400   16.0500 -118.1400      16.5        18       186        68
WVCT   2025250     91400   16.0500 -118.2700      15.3        24       186        91
WVCT   2025250     91400   16.0300 -118.4200      11.2        11       183        96
WVCT   2025250     91400   16.0100 -118.5100      11.4        13       184        92
WVCT   2025250     91400   16.0800 -118.5600      10.5        22       182        93
WVCT   2025250     91400   16.0000 -118.7600      16.1        32       182        99
WVCT   2025250     91400   16.0000 -118.8200      16.0        31       181       100
WVCT   2025250     91400   16.0700 -118.9600      15.5        26       178       100
WVCT   2025250     91400   16.0300 -119.0500      16.1        25       177        99
WVCT   2025250     91400   15.9900 -119.1600      17.7        25       175        97
WVCT   2025250     91400   16.0300 -119.2200      17.1        18       172        99
WVCT   2025250     91400   16.0300 -119.3500      17.3        28       174       100
WVCT   2025250     91400   16.0200 -119.4500      17.9        35       198       100
WVCT   2025250     91400   15.9800 -119.5200      17.3        38       179        96
WVCT   2025250     91400   16.0400 -119.6600      18.1        37       178        77
WVCT   2025250     91400   16.1400 -109.2900       9.3        99       211        99
WVCT   2025250     91400   16.1300 -109.4100       8.6       100       211        89
WVCT   2025250     91400   16.1700 -109.6900       8.6       293       203        89
WVCT   2025250     91400   16.1600 -109.8300      10.7       306       199        64
WVCT   2025250     91400   16.2000 -109.9200      11.9        12       197        92
WVCT   2025250     91400   16.1500 -110.1900       5.8        56       201        69
WVCT   2025250     91400   16.1700 -110.3300      11.0        72       200        98
WVCT   2025250     91400   16.1000 -110.7500       6.8        46       199        62
WVCT   2025250     91400   16.1300 -110.8300       8.3        47       198        85
WVCT   2025250     91400   16.1400 -111.9700       9.6        62       177        62
WVCT   2025250     91400   16.1200 -112.1800      14.1        41       176        85
WVCT   2025250     91400   16.0600 -112.2700      10.1        39       177        92
WVCT   2025250     91400   16.0500 -112.4000       6.7        52       174        84
WVCT   2025250     91400   16.1300 -112.4600       4.0        61       171        75
WVCT   2025250     91400   16.0600 -112.7400      14.4        53       173        88
WVCT   2025250     91400   16.1000 -112.8500      12.1        62       173       100
WVCT   2025250     91400   16.1100 -113.1000       5.2       202       174        75
WVCT   2025250     91400   16.0700 -113.2200       4.7       171       176        62
WVCT   2025250     91400   16.1100 -113.2600       5.1       163       174        62
WVCT   2025250     91400   16.1000 -113.6700      19.4        43       170        97
WVCT   2025250     91400   16.0300 -114.0200      19.4        43       176        99
WVCT   2025250     91400   16.0900 -114.0500      18.1        41       173        85
WVCT   2025250     91400   16.0700 -114.1700       6.0        31       188        60
WVCT   2025250     91400   15.9800 -115.2900      10.4        26       182        97
WVCT   2025250     91400   15.9700 -115.6000      13.2        25       165        78
WVCT   2025250     91400   16.0500 -115.7000      13.9        33       169        94
WVCT   2025250     91400   15.9900 -115.7500      14.5        37       170        93
WVCT   2025250     91400   16.0400 -115.9200      11.3        11       172        93
WVCT   2025250     91400   16.0400 -115.9400      10.9        10       172        95
WVCT   2025250     91400   16.0400 -116.1100      11.0        16       171        90
WVCT   2025250     91400   15.9800 -116.1900      11.4        16       174        97
WVCT   2025250     91400   16.0300 -116.3500      12.2        16       172        98
WVCT   2025250     91400   15.9900 -116.4700      13.8        23       171       100
WVCT   2025250     91400   15.9900 -116.5100      14.3        25       170       100
WVCT   2025250     91400   16.0200 -116.8300      12.5         3       184        96
WVCT   2025250     91400   15.9400 -117.0000      13.1        23       184        99
WVCT   2025250     91400   15.9400 -117.1500      12.8        25       186       100
WVCT   2025250     91400   15.9300 -117.3000       7.9        14       186        72
WVCT   2025250     91400   15.9500 -117.4000      11.2         2       187        91
WVCT   2025250     91400   15.9700 -117.4700      15.7       356       184        95
WVCT   2025250     91400   15.9700 -117.6200      17.8        12       178        98
WVCT   2025250     91400   15.9600 -117.7700      13.8        11       174       100
WVCT   2025250     91400   15.9400 -117.8100      12.6         9       174        99
WVCT   2025250     91400   15.9200 -117.9000      12.8        10       174        95
WVCT   2025250     91400   16.0000 -118.0600      17.8        19       178        85
WVCT   2025250     91400   15.9100 -118.3100      16.6        29       186       100
WVCT   2025250     91400   15.9900 -118.4000      12.5        19       183        88
WVCT   2025250     91400   15.9700 -118.5100      12.6        20       184        99
WVCT   2025250     91400   15.9300 -118.6000      15.4        30       189       100
WVCT   2025250     91400   15.9400 -118.7300      17.2        34       185       100
WVCT   2025250     91400   15.9600 -118.7700      17.0        33       182        99
WVCT   2025250     91400   15.9800 -118.8500      16.3        31       181       100
WVCT   2025250     91400   15.9800 -118.9800      15.5        27       179       100
WVCT   2025250     91400   15.9300 -119.1100      17.4        25       178       100
WVCT   2025250     91400   15.9700 -119.2500      18.5        24       175       100
WVCT   2025250     91400   15.8900 -119.3000      19.8        30       201       100
WVCT   2025250     91400   15.9300 -119.3800      18.8        30       208       100
WVCT   2025250     91400   15.9100 -119.5700      15.0        35       181        97
WVCT   2025250     91400   15.9600 -119.6700      16.8        38       177        77
WVCT   2025250     91400   16.0600 -109.2600      15.2        99       213        68
WVCT   2025250     91400   16.0800 -109.3300       8.2       107       213        94
WVCT   2025250     91400   16.1100 -109.4400       6.1       104       211        69
WVCT   2025250     91400   16.0900 -110.3000       6.8        69       200        66
WVCT   2025250     91400   16.0300 -110.3600       7.5        51       195        89
WVCT   2025250     91400   16.0700 -110.4500      10.7        53       196        99
WVCT   2025250     91400   16.0800 -110.6300       9.4        47       201        74
WVCT   2025250     91400   16.0800 -110.7500       7.8        48       199        74
WVCT   2025250     91400   16.0000 -110.8100      10.5        49       192        89
WVCT   2025250     91400   16.0500 -110.9200      13.0        38       192        61
WVCT   2025250     91400   16.0400 -111.4600      13.2        54       190        60
WVCT   2025250     91400   16.0400 -111.5100      14.0        52       188        60
WVCT   2025250     91400   15.9600 -112.0300       9.5        63       182        70
WVCT   2025250     91400   15.9600 -112.3100       7.1        56       178        73
WVCT   2025250     91400   16.0100 -112.3400       8.3        48       177        70
WVCT   2025250     91400   16.0100 -112.5500       5.5        81       174        73
WVCT   2025250     91400   15.9800 -112.7800      20.2        43       176        99
WVCT   2025250     91400   15.9600 -112.9000      16.6        59       176        83
WVCT   2025250     91400   15.9800 -112.9200      16.0        61       175        79
WVCT   2025250     91400   16.0200 -113.0300       5.9       157       177        63
WVCT   2025250     91400   15.9700 -113.2600       4.7        42       179        81
WVCT   2025250     91400   15.9500 -113.3800       9.4        22       176        72
WVCT   2025250     91400   15.9600 -113.5300      10.1        53       174        69
WVCT   2025250     91400   16.0000 -113.6400      19.7        43       173        90
WVCT   2025250     91400   15.9900 -114.0000      19.9        40       176       100
WVCT   2025250     91400   15.9200 -115.2600       9.2        16       175        98
WVCT   2025250     91400   15.9200 -115.2800       9.6        17       175        99
WVCT   2025250     91400   15.9000 -115.3900      13.0        20       170        91
WVCT   2025250     91400   15.8800 -115.5700      15.3        34       167        65
WVCT   2025250     91400   15.8700 -115.6800      14.5        45       167        81
WVCT   2025250     91400   15.9500 -115.7800      15.2        37       169        98
WVCT   2025250     91400   15.8700 -115.8400      14.9        41       185        95
WVCT   2025250     91400   15.9000 -116.0300       9.6        23       204        94
WVCT   2025250     91400   15.9000 -116.1400      11.7        22       185        86
WVCT   2025250     91400   15.8800 -116.2300      11.8        19       181        85
WVCT   2025250     91400   15.8800 -116.2900      11.8        19       178        75
WVCT   2025250     91400   15.9000 -116.9200      13.4        13       181        99
WVCT   2025250     91400   15.9000 -117.1500      13.4        31       185        98
WVCT   2025250     91400   15.8900 -117.3100       8.4        22       185        66
WVCT   2025250     91400   15.8900 -117.3500       8.0        14       186        64
WVCT   2025250     91400   15.8300 -117.4900      15.7         4       178        95
WVCT   2025250     91400   15.8700 -117.6500      16.6        12       175        96
WVCT   2025250     91400   15.8500 -117.7400      12.4        20       176        95
WVCT   2025250     91400   15.8200 -117.8300       8.6        17       174        87
WVCT   2025250     91400   15.9000 -117.9500      12.8        13       174       100
WVCT   2025250     91400   15.9000 -117.9900      14.1        17       175        99
WVCT   2025250     91400   15.9000 -118.1800      16.0        35       182        99
WVCT   2025250     91400   15.8900 -118.2000      16.0        35       183        98
WVCT   2025250     91400   15.8100 -118.4100      17.0        28       189        99
WVCT   2025250     91400   15.8300 -118.4200      16.7        28       190        99
WVCT   2025250     91400   15.8300 -118.5900      15.4        33       189        98
WVCT   2025250     91400   15.8800 -118.7100      17.6        36       189        98
WVCT   2025250     91400   15.8000 -118.7900      19.7        39       188       100
WVCT   2025250     91400   15.8800 -118.9300      17.8        36       179       100
WVCT   2025250     91400   15.8600 -118.9700      17.7        34       180        99
WVCT   2025250     91400   15.8000 -119.1500      18.5        28       183       100
WVCT   2025250     91400   15.8300 -119.2500      19.5        29       188       100
WVCT   2025250     91400   15.8700 -119.3100      19.9        31       202       100
WVCT   2025250     91400   15.7900 -119.3800      20.2        40       207       100
WVCT   2025250     91400   15.8700 -119.4900      14.6        35       200        99
WVCT   2025250     91400   15.8700 -119.6000      11.9        35       180        99
WVCT   2025250     91400   16.0200 -109.2200      16.8        90       213        93
WVCT   2025250     91400   15.9100 -110.2900       6.4        32       193        68
WVCT   2025250     91400   15.9100 -110.3100       5.8        33       193        68
WVCT   2025250     91400   15.9700 -110.4700       8.6        48       195        97
WVCT   2025250     91400   15.9100 -110.5500       8.5        53       196       100
WVCT   2025250     91400   15.9400 -110.7600      12.8        48       193        97
WVCT   2025250     91400   15.9800 -110.8200      11.6        49       192        90
WVCT   2025250     91400   15.9000 -110.9000      16.0        52       192        60
WVCT   2025250     91400   15.8800 -111.4000       8.3        58       192        77
WVCT   2025250     91400   15.9600 -111.6200      17.9        46       187        83
WVCT   2025250     91400   15.8700 -111.8900       7.1        74       186        95
WVCT   2025250     91400   15.8900 -111.9700       7.8        69       185        90
WVCT   2025250     91400   15.9100 -112.6400      12.9        52       176        98
WVCT   2025250     91400   15.8700 -112.7800      18.9        43       175        98
WVCT   2025250     91400   15.9200 -112.8800      16.9        56       175        93
WVCT   2025250     91400   15.9200 -112.9500      16.3        74       175        81
WVCT   2025250     91400   15.8600 -113.1700      20.0        45       178       100
WVCT   2025250     91400   15.8900 -113.3900      14.1        21       176        73
WVCT   2025250     91400   15.8700 -113.4100      14.2        25       176        82
WVCT   2025250     91400   15.8600 -113.6200      10.4        47       175        97
WVCT   2025250     91400   15.8200 -113.8500      17.7        36       174        72
WVCT   2025250     91400   15.8400 -113.8700      18.7        35       174        87
WVCT   2025250     91400   15.8400 -115.3800      14.6        20       168        95
WVCT   2025250     91400   15.8000 -115.5200      17.2        32       167        84
WVCT   2025250     91400   15.8000 -115.5400      17.1        34       167        86
WVCT   2025250     91400   15.7900 -115.7400      14.8        42       169        95
WVCT   2025250     91400   15.8300 -115.7800      15.3        43       169        87
WVCT   2025250     91400   15.8300 -115.8600      14.3        43       190        93
WVCT   2025250     91400   15.8300 -115.9900      11.7        37       199        90
WVCT   2025250     91400   15.7800 -116.2800      12.1        26       180        89
WVCT   2025250     91400   15.7800 -116.3100      12.0        27       180        88
WVCT   2025250     91400   15.7600 -116.4600      13.4        23       185        99
WVCT   2025250     91400   15.7900 -116.8300      13.4        15       180        90
WVCT   2025250     91400   15.7700 -116.8900      13.1        21       178        96
WVCT   2025250     91400   15.7600 -117.2400      10.5        33       179        63
WVCT   2025250     91400   15.8100 -117.3800       8.4        16       180        66
WVCT   2025250     91400   15.7300 -117.5900      16.2         6       173       100
WVCT   2025250     91400   15.7300 -117.6100      16.1         5       173       100
WVCT   2025250     91400   15.7300 -117.7600      12.0         3       171        88
WVCT   2025250     91400   15.8000 -117.8500       8.0        14       174        87
WVCT   2025250     91400   15.7400 -117.9300       8.2         6       172        81
WVCT   2025250     91400   15.7400 -118.0300      12.2        25       174        98
WVCT   2025250     91400   15.7600 -118.1800      17.6        37       174        98
WVCT   2025250     91400   15.7200 -118.2900      17.5        32       177        98
WVCT   2025250     91400   15.7900 -118.3900      17.2        27       187        99
WVCT   2025250     91400   15.7500 -118.5000      15.8        27       183        97
WVCT   2025250     91400   15.7300 -118.5900      13.9        31       181        92
WVCT   2025250     91400   15.7500 -118.7500      18.2        40       186        99
WVCT   2025250     91400   15.7300 -118.8400      21.0        41       178        99
WVCT   2025250     91400   15.7400 -118.9400      21.4        39       177        99
WVCT   2025250     91400   15.7000 -119.0500      20.9        35       179        97
WVCT   2025250     91400   15.7200 -119.1400      19.9        32       181       100
WVCT   2025250     91400   15.7600 -119.2200      19.0        32       189       100
WVCT   2025250     91400   15.7400 -119.3000      20.6        40       203        99
WVCT   2025250     91400   15.7100 -119.4900      22.5        58       171        79
WVCT   2025250     91400   15.6900 -119.6000      18.1        63       162        88
WVCT   2025250     91400   15.6900 -119.6200      17.5        63       161        82
WVCT   2025250     91400   15.9000 -109.3400      11.2        53       216        69
WVCT   2025250     91400   15.8300 -109.7600       6.9       321       203        71
WVCT   2025250     91400   15.8300 -109.8800       4.8       353       202        72
WVCT   2025250     91400   15.8600 -110.1800       4.7        28       194        77
WVCT   2025250     91400   15.8100 -110.2900       5.9        46       193        94
WVCT   2025250     91400   15.8700 -110.4200       6.2        43       194        89
WVCT   2025250     91400   15.8600 -110.6300       9.2        48       197        73
WVCT   2025250     91400   15.8800 -110.7200      11.6        48       196        75
WVCT   2025250     91400   15.8600 -110.9100      16.4        54       193        60
WVCT   2025250     91400   15.8200 -111.5000       6.6        79       189        96
WVCT   2025250     91400   15.8500 -111.7500      15.4        59       186        81
WVCT   2025250     91400   15.8500 -111.8700       8.0        71       187        77
WVCT   2025250     91400   15.8100 -112.0600       7.4        69       184        99
WVCT   2025250     91400   15.7600 -112.2000      17.4        50       181        81
WVCT   2025250     91400   15.7600 -112.3900      20.7        41       180        85
WVCT   2025250     91400   15.7700 -112.5000      14.6        50       178        64
WVCT   2025250     91400   15.7500 -112.6400      15.3        46       179        73
WVCT   2025250     91400   15.8300 -112.7600      18.6        44       175        97
WVCT   2025250     91400   15.8100 -112.8100      18.3        46       175        97
WVCT   2025250     91400   15.7600 -112.9800      20.4        47       182        93
WVCT   2025250     91400   15.7600 -113.0900      21.0        47       181        91
WVCT   2025250     91400   15.7400 -113.2300      11.9        48       178        90
WVCT   2025250     91400   15.7600 -113.2500      13.2        41       177        99
WVCT   2025250     91400   15.7700 -113.5700       5.8        56       176        98
WVCT   2025250     91400   15.7800 -113.7200       5.8        37       175        70
WVCT   2025250     91400   15.8000 -113.8500      17.7        36       174        71
WVCT   2025250     91400   15.7500 -115.2600      14.7        17       169        99
WVCT   2025250     91400   15.7000 -115.4200      16.1        25       165        99
WVCT   2025250     91400   15.7600 -115.5500      17.4        36       168        96
WVCT   2025250     91400   15.7400 -115.6800      15.4        42       172       100
WVCT   2025250     91400   15.7000 -115.7300      13.8        34       173        97
WVCT   2025250     91400   15.6700 -115.8400      12.0        21       173        85
WVCT   2025250     91400   15.7400 -116.3100      12.9        29       182        98
WVCT   2025250     91400   15.6500 -116.6900      13.6        17       169        97
WVCT   2025250     91400   15.7300 -116.8800      13.1        24       181        98
WVCT   2025250     91400   15.7300 -116.9400      13.8        34       182        99
WVCT   2025250     91400   15.6400 -117.5400      12.4        16       175        97
WVCT   2025250     91400   15.7100 -117.5900      15.6         7       174       100
WVCT   2025250     91400   15.6300 -117.7100      12.5         6       172        96
WVCT   2025250     91400   15.6900 -117.7600      12.4         0       170       100
WVCT   2025250     91400   15.6300 -117.8800      11.6        10       170        91
WVCT   2025250     91400   15.6500 -117.9800      12.6        19       173        88
WVCT   2025250     91400   15.6400 -118.1700      18.3        36       175        98
WVCT   2025250     91400   15.6200 -118.2000      18.1        36       175        97
WVCT   2025250     91400   15.7000 -118.3800      16.7        28       179       100
WVCT   2025250     91400   15.7000 -118.4000      16.3        26       180        99
WVCT   2025250     91400   15.6300 -118.6000      13.9        24       175        90
WVCT   2025250     91400   15.6300 -118.6400      14.4        30       171        97
WVCT   2025250     91400   15.6100 -118.8100      18.6        42       168       100
WVCT   2025250     91400   15.6500 -118.9100      21.9        43       177       100
WVCT   2025250     91400   15.6800 -119.0100      21.8        39       179        99
WVCT   2025250     91400   15.6800 -119.0400      21.5        38       180        99
WVCT   2025250     91400   15.6400 -119.1500      20.6        37       181       100
WVCT   2025250     91400   15.6800 -119.3300      21.3        51       190        99
WVCT   2025250     91400   15.6000 -119.4500      22.0        56       160        98
WVCT   2025250     91400   15.6200 -119.4600      22.5        58       161        97
WVCT   2025250     91400   15.6700 -119.6000      19.1        62       153        85
WVCT   2025250     91400   15.7400 -109.3000      12.9        59       208        94
WVCT   2025250     91400   15.7400 -109.4700       6.3        31       208        73
WVCT   2025250     91400   15.7700 -109.8000       5.0         2       201        88
WVCT   2025250     91400   15.8100 -109.8600       5.7       356       202        79
WVCT   2025250     91400   15.7900 -110.2700       5.5        50       193       100
WVCT   2025250     91400   15.7900 -110.3400       5.5        49       192       100
WVCT   2025250     91400   15.7500 -110.4600       6.7        43       193        89
WVCT   2025250     91400   15.7600 -111.7000      14.8        68       187        73
WVCT   2025250     91400   15.7400 -112.1800      17.3        50       181        84
WVCT   2025250     91400   15.6600 -112.2900      18.1        51       182        99
WVCT   2025250     91400   15.6600 -112.4300      16.5        60       183        66
WVCT   2025250     91400   15.7300 -112.6200      18.3        43       180        95
WVCT   2025250     91400   15.7300 -112.8000      18.5        41       177        98
WVCT   2025250     91400   15.7300 -112.8300      18.3        41       177        98
WVCT   2025250     91400   15.6400 -113.1600       8.3        66       178        74
WVCT   2025250     91400   15.7000 -113.2000      10.5        55       178        84
WVCT   2025250     91400   15.6700 -113.3800       5.2        78       177        90
WVCT   2025250     91400   15.6000 -114.8400      16.2        30       204       100
WVCT   2025250     91400   15.6000 -114.8700      16.0        30       203       100
WVCT   2025250     91400   15.6300 -115.2100      15.3        14       166        70
WVCT   2025250     91400   15.6700 -115.3400      15.1        21       165        96
WVCT   2025250     91400   15.6400 -115.4100      16.1        30       165       100
WVCT   2025250     91400   15.6000 -115.5900      17.1        46       170        99
WVCT   2025250     91400   15.6000 -115.7200      14.9        26       173        99
WVCT   2025250     91400   15.6200 -115.8300      12.8        10       174        92
WVCT   2025250     91400   15.6300 -115.8500      12.2        13       173        91
WVCT   2025250     91400   15.5900 -116.0500      13.3        36       172        99
WVCT   2025250     91400   15.5700 -116.1600      12.5        24       170        99
WVCT   2025250     91400   15.5700 -116.1900      12.4        23       170       100
WVCT   2025250     91400   15.5600 -116.3600      14.2        23       172        94
WVCT   2025250     91400   15.5600 -116.4000      14.2        21       173        91
WVCT   2025250     91400   15.6400 -116.5900      12.5        12       183        99
WVCT   2025250     91400   15.6400 -116.6100      12.5        13       181        99
WVCT   2025250     91400   15.5600 -116.7900      13.2        26       170        98
WVCT   2025250     91400   15.5500 -116.8400      14.1        31       175        97
WVCT   2025250     91400   15.6300 -117.0200      16.8        40       192        96
WVCT   2025250     91400   15.6300 -117.0400      16.6        40       192        96
WVCT   2025250     91400   15.6200 -117.2800      12.4        40       177        61
WVCT   2025250     91400   15.5600 -117.3700      14.5        33       176        72
WVCT   2025250     91400   15.6000 -117.5000      11.6        21       175        63
WVCT   2025250     91400   15.5600 -117.5900      11.2        16       175        95
WVCT   2025250     91400   15.5700 -117.7400      12.9        17       172        99
WVCT   2025250     91400   15.5500 -117.8900      14.7        30       170        89
WVCT   2025250     91400   15.5900 -117.9000      13.5        23       170        87
WVCT   2025250     91400   15.5300 -118.0600      18.2        39       175        99
WVCT   2025250     91400   15.5200 -118.2100      18.2        38       175        99
WVCT   2025250     91400   15.5200 -118.2500      18.0        36       175       100
WVCT   2025250     91400   15.5800 -118.3700      16.4        29       172        99
WVCT   2025250     91400   15.6000 -118.5000      14.2        16       171       100
WVCT   2025250     91400   15.5500 -118.6300      13.9        23       167        96
WVCT   2025250     91400   15.5300 -118.6500      14.5        26       168        96
WVCT   2025250     91400   15.5900 -118.8400      19.2        43       169       100
WVCT   2025250     91400   15.5700 -118.8600      19.8        43       171       100
WVCT   2025250     91400   15.5700 -119.0100      21.3        36       174       100
WVCT   2025250     91400   15.5100 -119.1400      20.9        36       162        98
WVCT   2025250     91400   15.5000 -119.1800      21.3        39       162        99
WVCT   2025250     91400   15.5200 -119.2900      21.2        43       162       100
WVCT   2025250     91400   15.5800 -119.4500      21.0        54       159        97
WVCT   2025250     91400   15.5000 -119.5000      14.4        42       139        87
WVCT   2025250     91400   15.6400 -109.3400      15.0        55       208        96
WVCT   2025250     91400   15.6400 -109.4600      15.4        48       209        85
WVCT   2025250     91400   15.6700 -109.9400       5.0        61       199       100
WVCT   2025250     91400   15.7000 -110.3100       5.7        61       193        75
WVCT   2025250     91400   15.6900 -110.3600       6.3        54       191        82
WVCT   2025250     91400   15.6900 -110.4700       7.9        38       193        85
WVCT   2025250     91400   15.5900 -112.2100      16.7        51       185        92
WVCT   2025250     91400   15.6400 -112.2900      18.1        51       183        99
WVCT   2025250     91400   15.6400 -112.4300      16.9        55       183        74
WVCT   2025250     91400   15.5600 -112.5400      17.8        45       183        92
WVCT   2025250     91400   15.5600 -112.6500      19.4        44       183        98
WVCT   2025250     91400   15.6300 -112.7300      19.7        41       183       100
WVCT   2025250     91400   15.5600 -113.1100       7.5        73       183        99
WVCT   2025250     91400   15.6200 -113.1900       6.7        77       178        80
WVCT   2025250     91400   15.5800 -113.3700       6.1        95       177        89
WVCT   2025250     91400   15.5800 -114.2300       5.2       344       186        98
WVCT   2025250     91400   15.5600 -114.8300      16.7        33       202        99
WVCT   2025250     91400   15.5000 -114.8800      17.4        29       193       100
WVCT   2025250     91400   15.5300 -115.1600      12.2         5       165        98
WVCT   2025250     91400   15.5700 -115.1800      12.7         7       165        94
WVCT   2025250     91400   15.5100 -115.3400      18.4        35       160        82
WVCT   2025250     91400   15.5100 -115.5000      18.8        49       166       100
WVCT   2025250     91400   15.4900 -115.5200      18.7        47       167        99
WVCT   2025250     91400   15.4800 -115.7200      16.1        21       167        99
WVCT   2025250     91400   15.4800 -115.8300      14.8        15       169        99
WVCT   2025250     91400   15.5200 -115.9100      13.8        17       171        97
WVCT   2025250     91400   15.4800 -116.0000      14.6        32       168        89
WVCT   2025250     91400   15.5500 -116.1000      13.1        31       167        99
WVCT   2025250     91400   15.5300 -116.2600      13.5        25       169        99
WVCT   2025250     91400   15.5300 -116.2800      13.5        24       170        98
WVCT   2025250     91400   15.4700 -116.4000      12.8        27       170        92
WVCT   2025250     91400   15.4800 -116.5000      12.2        20       172        94
WVCT   2025250     91400   15.4800 -116.6300      11.1        23       172        97
WVCT   2025250     91400   15.5400 -116.7800      12.7        25       170       100
WVCT   2025250     91400   15.5400 -116.8200      13.6        27       172        99
WVCT   2025250     91400   15.5200 -117.5500      13.8        28       174        69
WVCT   2025250     91400   15.4400 -117.6300      15.4        34       173        95
WVCT   2025250     91400   15.5200 -117.7000      13.7        25       174       100
WVCT   2025250     91400   15.4300 -117.8600      17.8        37       174        96
WVCT   2025250     91400   15.5100 -117.8900      15.8        35       171        86
WVCT   2025250     91400   15.4900 -118.0900      18.7        40       177       100
WVCT   2025250     91400   15.4900 -118.1700      18.8        40       177        99
WVCT   2025250     91400   15.5000 -118.3000      17.4        33       174       100
WVCT   2025250     91400   15.4800 -118.3200      17.0        30       174       100
WVCT   2025250     91400   15.4600 -118.4500      15.1        16       172        98
WVCT   2025250     91400   15.4200 -118.6300      15.8        25       169       100
WVCT   2025250     91400   15.5000 -118.6800      15.2        30       168        95
WVCT   2025250     91400   15.4900 -118.8100      17.3        43       172        99
WVCT   2025250     91400   15.4700 -118.9200      19.3        40       171       100
WVCT   2025250     91400   15.4700 -118.9600      19.0        36       168       100
WVCT   2025250     91400   15.4900 -119.1500      20.8        36       161        98
WVCT   2025250     91400   15.4900 -119.1700      21.0        37       161        99
WVCT   2025250     91400   15.4800 -119.3600      20.2        39       161        98
WVCT   2025250     91400   15.4800 -119.3800      19.0        38       159        99
WVCT   2025250     91400   15.4400 -119.4900      14.5        35       148        83
WVCT   2025250     91400   15.6200 -109.3500      15.4        53       208        96
WVCT   2025250     91400   15.6200 -109.4400      16.2        49       209        88
WVCT   2025250     91400   15.5300 -109.8900       4.4        53       202        99
WVCT   2025250     91400   15.5300 -109.9900       6.9        48       203       100
WVCT   2025250     91400   15.5700 -110.0300       7.6        50       203        99
WVCT   2025250     91400   15.5600 -110.2200       8.9        53       207        66
WVCT   2025250     91400   15.5700 -110.4700       6.9        30       199        61
WVCT   2025250     91400   15.4900 -111.3100      18.7        33       187        95
WVCT   2025250     91400   15.5100 -111.5600      15.8        43       185        92
WVCT   2025250     91400   15.4800 -111.6600      14.9        40       184        84
WVCT   2025250     91400   15.5000 -111.7200      13.3        38       184        63
WVCT   2025250     91400   15.5400 -112.3400      17.0        48       183        95
WVCT   2025250     91400   15.4600 -112.4200      11.7        36       183        60
WVCT   2025250     91400   15.5400 -112.5400      17.8        45       183        92
WVCT   2025250     91400   15.5200 -112.6400      19.7        44       182        99
WVCT   2025250     91400   15.4500 -113.0400       6.7        87       185        98
WVCT   2025250     91400   15.5100 -113.0700       7.3        76       184        99
WVCT   2025250     91400   15.4400 -113.1900       6.2        70       181        74
WVCT   2025250     91400   15.5000 -113.3900       9.4        78       178        77
WVCT   2025250     91400   15.5200 -113.4300       7.9        87       177        79
WVCT   2025250     91400   15.4200 -114.1600       4.9       358       186        99
WVCT   2025250     91400   15.4600 -114.3100      12.6        18       190        88
WVCT   2025250     91400   15.4100 -114.4800      15.1        30       203        86
WVCT   2025250     91400   15.4600 -114.8400      16.9        33       193       100
WVCT   2025250     91400   15.4800 -114.8600      17.2        31       193       100
WVCT   2025250     91400   15.4300 -115.2500      11.8       353       164        78
WVCT   2025250     91400   15.4700 -115.3900      20.7        45       161        99
WVCT   2025250     91400   15.3900 -115.5200      20.6        43       164       100
WVCT   2025250     91400   15.4300 -115.5300      19.9        42       166       100
WVCT   2025250     91400   15.4100 -115.6700      17.1        29       166       100
WVCT   2025250     91400   15.4600 -115.7700      15.5        19       166        99
WVCT   2025250     91400   15.4600 -115.9400      14.3        27       167        91
WVCT   2025250     91400   15.4600 -115.9900      14.9        33       168        92
WVCT   2025250     91400   15.3900 -116.2300      16.7        39       168       100
WVCT   2025250     91400   15.4500 -116.2900      14.3        35       169        99
WVCT   2025250     91400   15.4500 -116.4700      12.2        21       171        96
WVCT   2025250     91400   15.3800 -116.6000      13.6        24       173       100
WVCT   2025250     91400   15.3800 -116.6300      13.9        24       173       100
WVCT   2025250     91400   15.4400 -116.7500      13.3        24       171        96
WVCT   2025250     91400   15.3500 -117.3600      20.3        45       161        98
WVCT   2025250     91400   15.3500 -117.3800      20.4        46       161        98
WVCT   2025250     91400   15.3500 -117.4900      20.3        47       163       100
WVCT   2025250     91400   15.4000 -117.5900      17.8        41       170        96
WVCT   2025250     91400   15.3400 -117.7900      19.4        42       176        99
WVCT   2025250     91400   15.3600 -117.8300      19.0        40       176       100
WVCT   2025250     91400   15.3900 -117.9300      17.2        31       176        79
WVCT   2025250     91400   15.4100 -118.0400      16.8        33       178        98
WVCT   2025250     91400   15.3500 -118.3000      20.8        33       175        99
WVCT   2025250     91400   15.3500 -118.4300      18.7        24       174        95
WVCT   2025250     91400   15.3300 -118.4700      18.8        24       173        91
WVCT   2025250     91400   15.3600 -118.6100      18.4        27       171       100
WVCT   2025250     91400   15.3800 -118.7400      17.9        33       181        99
WVCT   2025250     91400   15.3600 -118.7600      18.5        35       180       100
WVCT   2025250     91400   15.3200 -118.9600      20.3        41       166       100
WVCT   2025250     91400   15.3300 -119.0600      19.7        40       165        99
WVCT   2025250     91400   15.3500 -119.0800      19.4        38       163        99
WVCT   2025250     91400   15.3100 -119.2500      19.0        28       165        99
WVCT   2025250     91400   15.3900 -119.3300      20.9        27       161        98
WVCT   2025250     91400   15.3800 -119.4100      17.1        25       156        99
WVCT   2025250     91400   15.3800 -119.5100      11.3        36       148        97
WVCT   2025250     91400   15.5200 -109.4200      16.6        51       208        99
WVCT   2025250     91400   15.5000 -109.4400      16.8        52       208        96
WVCT   2025250     91400   15.4400 -109.6700      14.7        33       204        60
WVCT   2025250     91400   15.4500 -109.8600       5.5        46       202        93
WVCT   2025250     91400   15.5100 -109.9700       6.8        52       203        99
WVCT   2025250     91400   15.4300 -110.1300       9.0        54       206        88
WVCT   2025250     91400   15.4600 -110.2600       8.8        56       205        97
WVCT   2025250     91400   15.4600 -110.2800       8.8        56       205        96
WVCT   2025250     91400   15.4200 -110.4600       4.0        32       186        74
WVCT   2025250     91400   15.4100 -110.6200       4.5        39       186        70
WVCT   2025250     91400   15.4300 -110.6400       5.6        42       187        70
WVCT   2025250     91400   15.4100 -110.7600       4.3        68       188        62
WVCT   2025250     91400   15.4300 -111.3000      13.1        28       186        71
WVCT   2025250     91400   15.4700 -111.3600      18.8        35       187        98
WVCT   2025250     91400   15.4700 -111.5400      19.9        44       185        79
WVCT   2025250     91400   15.4600 -111.6400      15.9        38       185        68
WVCT   2025250     91400   15.4500 -112.2800      11.5        36       187        76
WVCT   2025250     91400   15.3800 -112.5500      16.1        57       182        73
WVCT   2025250     91400   15.3800 -112.6400      19.0        46       184        98
WVCT   2025250     91400   15.3900 -113.0000       6.4        96       185        91
WVCT   2025250     91400   15.4300 -113.0400       6.5        94       183        99
WVCT   2025250     91400   15.4200 -113.2400       9.7        58       182        82
WVCT   2025250     91400   15.4200 -113.3600      16.2        53       182        98
WVCT   2025250     91400   15.3600 -113.3900      20.6        46       184       100
WVCT   2025250     91400   15.3900 -113.6100       4.2       340       175        79
WVCT   2025250     91400   15.3300 -113.8200       8.1        72       177        88
WVCT   2025250     91400   15.3900 -114.4800      16.1        28       202        90
WVCT   2025250     91400   15.2900 -115.3800      17.5        42       165       100
WVCT   2025250     91400   15.3700 -115.4500      20.8        43       162       100
WVCT   2025250     91400   15.3700 -115.5400      20.3        42       165       100
WVCT   2025250     91400   15.2900 -115.6600      18.7        39       165       100
WVCT   2025250     91400   15.3200 -115.8100      16.3        42       165       100
WVCT   2025250     91400   15.3000 -115.9000      17.2        51       165       100
WVCT   2025250     91400   15.3200 -116.1200      19.0        46       171        99
WVCT   2025250     91400   15.3400 -116.1600      18.3        42       170        99
WVCT   2025250     91400   15.2700 -116.2700      16.7        33       193        85
WVCT   2025250     91400   15.2700 -116.4500      15.4        38       194        97
WVCT   2025250     91400   15.2500 -117.2000      19.2        38       165        99
WVCT   2025250     91400   15.2500 -117.3300      18.5        43       162        99
WVCT   2025250     91400   15.3300 -117.4300      20.0        48       159        99
WVCT   2025250     91400   15.3300 -117.4500      20.1        48       160        99
WVCT   2025250     91400   15.2900 -117.5600      20.2        52       168       100
WVCT   2025250     91400   15.2400 -117.7600      19.2        43       174        98
WVCT   2025250     91400   15.3200 -117.7900      19.4        42       176        99
WVCT   2025250     91400   15.2800 -117.9000      15.7        15       177        77
WVCT   2025250     91400   15.3100 -118.0700      17.0        26       181        95
WVCT   2025250     91400   15.2900 -118.1800      18.6        30       177        92
WVCT   2025250     91400   15.2300 -118.4000      18.4        22       172        97
WVCT   2025250     91400   15.2300 -118.5000      19.5        23       171       100
WVCT   2025250     91400   15.2500 -118.5400      19.8        26       171       100
WVCT   2025250     91400   15.2400 -118.7100      20.5        39       176        99
WVCT   2025250     91400   15.2400 -118.7300      20.5        39       177        99
WVCT   2025250     91400   15.2800 -118.8400      20.2        39       169       100
WVCT   2025250     91400   15.2200 -118.9700      20.1        34       163        99
WVCT   2025250     91400   15.2200 -119.1000      19.5        26       166        66
WVCT   2025250     91400   15.2700 -119.1500      19.8        37       167        98
WVCT   2025250     91400   15.2500 -119.3400      18.2        30       166        96
WVCT   2025250     91400   15.2300 -119.4100      18.5        36       166        98
WVCT   2025250     91400   15.2100 -119.5600      19.5        43       170        90
WVCT   2025250     91400   15.2100 -119.6200      18.1        46       170        96
WVCT   2025250     91400   15.2000 -119.7000      19.2        51       170        64
WVCT   2025250     91400   15.3700 -109.4000      15.9        60       198        89
WVCT   2025250     91400   15.4200 -109.4600      15.9        56       208        76
WVCT   2025250     91400   15.4000 -109.6800      10.1         9       203        91
WVCT   2025250     91400   15.4000 -109.7800       7.3        12       203        71
WVCT   2025250     91400   15.4100 -109.8200       6.0        25       202        81
WVCT   2025250     91400   15.4100 -110.0100       8.4        63       206        99
WVCT   2025250     91400   15.3300 -110.0700       9.0        71       208        97
WVCT   2025250     91400   15.3800 -110.1800       7.6        59       207        84
WVCT   2025250     91400   15.3100 -110.6900       4.6        80       186        89
WVCT   2025250     91400   15.3800 -110.9800      21.1        46       193        94
WVCT   2025250     91400   15.3800 -111.0000      21.1        47       195        94
WVCT   2025250     91400   15.3400 -111.2200       4.1        34       186        98
WVCT   2025250     91400   15.2900 -111.3700       8.3        56       186        61
WVCT   2025250     91400   15.3700 -111.5900      12.1        38       186        68
WVCT   2025250     91400   15.3200 -111.8700      15.9        41       184        80
WVCT   2025250     91400   15.3200 -112.5300      15.2        64       184        61
WVCT   2025250     91400   15.3400 -112.5500      15.9        62       183        69
WVCT   2025250     91400   15.3300 -112.9200       9.5        52       190        86
WVCT   2025250     91400   15.3300 -113.0600       4.2       102       183        63
WVCT   2025250     91400   15.3300 -113.1200       4.1        87       182        60
WVCT   2025250     91400   15.2700 -113.2900      13.1        38       180        89
WVCT   2025250     91400   15.2400 -113.4500      13.8        20       176        93
WVCT   2025250     91400   15.3000 -113.5100      15.6        28       176        99
WVCT   2025250     91400   15.3200 -113.5800      10.5         7       175        71
WVCT   2025250     91400   15.3000 -113.6900       8.1        27       174        60
WVCT   2025250     91400   15.2700 -113.9000       5.9        38       177        83
WVCT   2025250     91400   15.2300 -114.0400       5.6       342       175        64
WVCT   2025250     91400   15.3000 -114.3600      10.4        30       199        88
WVCT   2025250     91400   15.2000 -115.1300      10.4        29       171        93
WVCT   2025250     91400   15.2000 -115.1500      10.4        31       171        87
WVCT   2025250     91400   15.2800 -115.2500      10.8        20       168        76
WVCT   2025250     91400   15.2500 -115.4300      16.5        40       166        94
WVCT   2025250     91400   15.2300 -115.5200      17.5        37       165        90
WVCT   2025250     91400   15.2100 -115.7800      17.3        44       167        98
WVCT   2025250     91400   15.2100 -115.8100      17.1        44       167        97
WVCT   2025250     91400   15.2400 -116.0600      19.0        50       172        99
WVCT   2025250     91400   15.2600 -116.2100      17.3        33       194        93
WVCT   2025250     91400   15.2600 -116.2300      17.0        31       194        88
WVCT   2025250     91400   15.2500 -116.4300      15.6        38       195        92
WVCT   2025250     91400   15.2500 -116.4900      15.4        39       193        98
WVCT   2025250     91400   15.2500 -116.6000      15.5        33       177       100
WVCT   2025250     91400   15.2500 -116.6700      16.3        35       176        98
WVCT   2025250     91400   15.2200 -116.8600      17.2        37       179       100
WVCT   2025250     91400   15.2400 -117.1800      18.8        37       167        99
WVCT   2025250     91400   15.2000 -117.2300      18.1        41       168       100
WVCT   2025250     91400   15.1700 -117.3200      17.8        42       168        99
WVCT   2025250     91400   15.2300 -117.4600      18.7        51       163        92
WVCT   2025250     91400   15.2100 -117.5700      19.9        53       172        99
WVCT   2025250     91400   15.2000 -117.7200      18.7        43       174       100
WVCT   2025250     91400   15.2200 -117.7400      18.6        42       174       100
WVCT   2025250     91400   15.2200 -117.8700      17.5        25       177        68
WVCT   2025250     91400   15.1400 -118.0100      19.0        30       182        70
WVCT   2025250     91400   15.1800 -118.1500      17.1        29       178        99
WVCT   2025250     91400   15.1900 -118.2100      17.4        23       175        98
WVCT   2025250     91400   15.1900 -118.3000      17.3        20       172        93
WVCT   2025250     91400   15.2100 -118.4700      18.9        20       170        99
WVCT   2025250     91400   15.2100 -118.5500      19.7        25       171       100
WVCT   2025250     91400   15.1300 -118.6700      19.9        34       173        99
WVCT   2025250     91400   15.2000 -118.7600      20.6        39       172       100
WVCT   2025250     91400   15.1800 -118.8100      20.2        36       170       100
WVCT   2025250     91400   15.2000 -118.9900      20.0        30       164        93
WVCT   2025250     91400   15.2000 -119.0100      19.9        29       164        85
WVCT   2025250     91400   15.2000 -119.1400      19.8        21       167        63
WVCT   2025250     91400   15.1100 -119.3200      20.5        38       170        95
WVCT   2025250     91400   15.1500 -119.4200      19.5        38       172       100
WVCT   2025250     91400   15.1700 -119.5200      18.9        37       174        99
WVCT   2025250     91400   15.1900 -119.6000      18.6        41       171        99
WVCT   2025250     91400   15.1900 -119.6400      19.1        46       171        78
WVCT   2025250     91400   15.2500 -109.4000      17.4        68       195        93
WVCT   2025250     91400   15.3100 -109.4800      15.9        58       207        97
WVCT   2025250     91400   15.2400 -109.7100       8.8       321       201        74
WVCT   2025250     91400   15.2900 -109.9600       8.1        48       204        75
WVCT   2025250     91400   15.3100 -110.1000       8.9        70       208        96
WVCT   2025250     91400   15.2800 -110.2900       4.5        51       204        88
WVCT   2025250     91400   15.2700 -110.6500       4.9        98       185        66
WVCT   2025250     91400   15.2900 -110.6700       4.8        87       186        86
WVCT   2025250     91400   15.2300 -110.9100       5.4        80       194        63
WVCT   2025250     91400   15.2600 -111.1900       6.3        40       189        72
WVCT   2025250     91400   15.2800 -111.3500       9.0        54       186        72
WVCT   2025250     91400   15.1900 -111.4800      13.3        71       185        98
WVCT   2025250     91400   15.2400 -111.7900       8.6       175       189        70
WVCT   2025250     91400   15.2200 -112.1400      24.6        28       182        98
WVCT   2025250     91400   15.2400 -112.9100      10.2        37       187        93
WVCT   2025250     91400   15.1800 -112.9700       7.3        10       184        91
WVCT   2025250     91400   15.2300 -113.1400       8.0        35       182        88
WVCT   2025250     91400   15.1500 -113.2000       7.4        40       179        86
WVCT   2025250     91400   15.1500 -113.3800       8.5        22       178        82
WVCT   2025250     91400   15.2000 -113.5100      12.9        18       174        96
WVCT   2025250     91400   15.2200 -113.5500      12.8        16       173        83
WVCT   2025250     91400   15.2100 -113.8400       8.6        42       174        74
WVCT   2025250     91400   15.1700 -113.9600       7.5        18       174        94
WVCT   2025250     91400   15.2100 -114.0200       6.4       357       175        85
WVCT   2025250     91400   15.2100 -114.1500       4.0       331       177        87
WVCT   2025250     91400   15.1200 -114.3700       5.7        12       193        90
WVCT   2025250     91400   15.1800 -115.1300      11.4        31       172        95
WVCT   2025250     91400   15.1300 -115.6200      17.4        40       165        99
WVCT   2025250     91400   15.1600 -115.9900      18.4        42       188        87
WVCT   2025250     91400   15.1600 -116.1600      17.5        36       213        92
WVCT   2025250     91400   15.1400 -116.1800      17.1        32       213        96
WVCT   2025250     91400   15.1000 -116.3200      16.6        28       210        82
WVCT   2025250     91400   15.0800 -116.5000      14.5        27       175        95
WVCT   2025250     91400   15.1300 -116.6000      15.5        32       173        98
WVCT   2025250     91400   15.1500 -116.6600      16.2        35       175        99
WVCT   2025250     91400   15.1100 -116.7500      16.5        35       178       100
WVCT   2025250     91400   15.1400 -117.2800      17.5        42       173        98
WVCT   2025250     91400   15.0600 -117.4400      18.9        40       174        91
WVCT   2025250     91400   15.0700 -117.4900      18.6        42       174        93
WVCT   2025250     91400   15.0700 -117.6300      18.8        40       176        98
WVCT   2025250     91400   15.1100 -117.7600      14.7        35       178        95
WVCT   2025250     91400   15.0700 -117.8100      13.7        28       179        87
WVCT   2025250     91400   15.1000 -117.9100      16.3        16       181        78
WVCT   2025250     91400   15.1200 -118.0700      18.1        38       182        97
WVCT   2025250     91400   15.0400 -118.1900      16.0        31       179        99
WVCT   2025250     91400   15.1200 -118.3100      16.5        18       172        91
WVCT   2025250     91400   15.1100 -118.3300      16.7        19       172        93
WVCT   2025250     91400   15.0900 -118.5200      18.5        21       171       100
WVCT   2025250     91400   15.0900 -118.5400      18.6        22       170       100
WVCT   2025250     91400   15.1100 -118.6900      20.1        35       171        99
WVCT   2025250     91400   15.0700 -118.7600      19.9        35       170       100
WVCT   2025250     91400   15.0300 -118.8700      18.2        27       167        99
WVCT   2025250     91400   15.1000 -118.9600      19.8        23       168        88
WVCT   2025250     91400   15.0200 -119.1200      17.8        31       169        99
WVCT   2025250     91400   15.0200 -119.2300      18.2        43       169        99
WVCT   2025250     91400   15.0200 -119.3700      20.2        42       173       100
WVCT   2025250     91400   15.0400 -119.3900      20.6        41       174       100
WVCT   2025250     91400   15.0900 -119.4900      19.8        35       179        99
WVCT   2025250     91400   15.0500 -119.6400      18.9        36       177        99
WVCT   2025250     91400   15.1500 -109.4000      15.9        65       179        98
WVCT   2025250     91400   15.1700 -109.5800      17.6        68       208        75
WVCT   2025250     91400   15.2200 -109.8100       9.2       331       201        81
WVCT   2025250     91400   15.1500 -110.0600       7.0        75       203        86
WVCT   2025250     91400   15.1700 -110.2000       9.1        65       205        62
WVCT   2025250     91400   15.1700 -110.2200       8.4        64       206        60
WVCT   2025250     91400   15.1600 -110.5500       4.4        83       196        83
WVCT   2025250     91400   15.1200 -110.6100       4.9        94       198        70
WVCT   2025250     91400   15.1000 -111.2200       9.2        84       201        77
WVCT   2025250     91400   15.1200 -111.4200      14.5        64       184        76
WVCT   2025250     91400   15.1700 -111.4600      15.2        63       185        68
WVCT   2025250     91400   15.1300 -113.1800       7.0        39       178        87
WVCT   2025250     91400   15.0900 -113.4600      11.6        15       172        99
WVCT   2025250     91400   15.1100 -113.4800      12.1        15       171       100
WVCT   2025250     91400   15.1200 -113.5900      13.4        20       169        88
WVCT   2025250     91400   15.0400 -113.7600      12.5        22       166        69
WVCT   2025250     91400   15.0600 -113.8200       8.8        27       167        93
WVCT   2025250     91400   15.0300 -114.0200       4.6       360       173        72
WVCT   2025250     91400   15.0500 -114.0400       4.9         2       176        93
WVCT   2025250     91400   15.1000 -114.3500       6.4        13       193        86
WVCT   2025250     91400   15.0200 -114.4700      12.3         4       186        65
WVCT   2025250     91400   15.0400 -115.5700      16.8        38       167        90
WVCT   2025250     91400   15.0300 -115.9400      16.3        31       189        87
WVCT   2025250     91400   14.9900 -116.0600      16.3        27       184        89
WVCT   2025250     91400   14.9800 -116.2300      16.1        30       183        94
WVCT   2025250     91400   15.0000 -116.3300      15.7        23       182        82
WVCT   2025250     91400   14.9800 -116.3600      15.3        20       180        89
WVCT   2025250     91400   14.9800 -116.5100      14.4        13       175        95
WVCT   2025250     91400   14.9800 -116.6600      15.0        25       175        95
WVCT   2025250     91400   14.9700 -116.6800      15.3        28       178        96
WVCT   2025250     91400   15.0000 -117.3000      18.1        36       176       100
WVCT   2025250     91400   15.0200 -117.3200      18.1        36       176       100
WVCT   2025250     91400   14.9800 -117.4600      19.8        41       175        99
WVCT   2025250     91400   14.9900 -117.5800      19.1        35       175        97
WVCT   2025250     91400   14.9900 -117.7100      14.1        40       178        97
WVCT   2025250     91400   14.9700 -117.7800      12.7        39       177        98
WVCT   2025250     91400   15.0100 -117.9000      13.1        21       180        64
WVCT   2025250     91400   14.9900 -117.9700      15.6        24       180        63
WVCT   2025250     91400   15.0200 -118.1500      15.8        37       179        98
WVCT   2025250     91400   14.9600 -118.2600      15.5        17       175        99
WVCT   2025250     91400   14.9600 -118.3100      16.2        20       174        99
WVCT   2025250     91400   15.0200 -118.4300      19.3        27       172        95
WVCT   2025250     91400   14.9900 -118.5400      20.2        27       172       100
WVCT   2025250     91400   14.9300 -118.6900      18.2        34       173       100
WVCT   2025250     91400   14.9300 -118.7100      18.1        36       174       100
WVCT   2025250     91400   14.9700 -118.9000      18.3        34       168        96
WVCT   2025250     91400   14.9300 -118.9900      18.4        35       170        98
WVCT   2025250     91400   14.9300 -119.0500      18.0        34       170        99
WVCT   2025250     91400   14.9400 -119.1500      18.6        43       169       100
WVCT   2025250     91400   14.9600 -119.3000      20.9        49       170       100
WVCT   2025250     91400   15.0000 -119.3500      20.1        44       172       100
WVCT   2025250     91400   15.0000 -119.4600      19.9        41       180       100
WVCT   2025250     91400   14.9400 -119.5500      19.5        43       182       100
WVCT   2025250     91400   14.9100 -119.7400      18.4        42       175        81
WVCT   2025250     91400   14.9300 -119.7600      18.1        43       175        79
WVCT   2025250     91400   15.0900 -109.4100      13.9        54       179        97
WVCT   2025250     91400   15.0700 -109.5800      13.6        35       193        95
WVCT   2025250     91400   15.0500 -109.6800      14.1        11       193        81
WVCT   2025250     91400   15.0800 -110.0000       5.0       108       203        72
WVCT   2025250     91400   15.0300 -110.1300       4.2       121       203        71
WVCT   2025250     91400   15.0700 -110.3800       6.4        68       202        63
WVCT   2025250     91400   15.0600 -110.5700       4.6        86       200        64
WVCT   2025250     91400   15.0800 -110.5900       4.7        91       199        64
WVCT   2025250     91400   15.0200 -110.7400       7.4        90       197        73
WVCT   2025250     91400   15.0300 -110.8600       6.8        82       194        99
WVCT   2025250     91400   15.0100 -111.0200      10.2        76       200       100
WVCT   2025250     91400   15.0800 -111.1500       8.5        83       201        74
WVCT   2025250     91400   15.0800 -111.2200       7.8        82       201        76
WVCT   2025250     91400   15.0400 -111.3900      13.4        65       197        69
WVCT   2025250     91400   15.0800 -111.4100      13.9        67       184        73
WVCT   2025250     91400   15.0200 -111.5600      10.9        71       192        70
WVCT   2025250     91400   15.0600 -112.2200       4.1       135       186        88
WVCT   2025250     91400   14.9800 -113.0000       6.0       337       175        90
WVCT   2025250     91400   15.0000 -113.0400       8.4       340       175        71
WVCT   2025250     91400   14.9900 -113.3600       6.7         8       174        62
WVCT   2025250     91400   14.9500 -113.5700      20.1        27       162        94
WVCT   2025250     91400   14.9700 -113.5900      19.6        28       163        97
WVCT   2025250     91400   15.0000 -113.7200      13.4        22       164        88
WVCT   2025250     91400   15.0200 -113.8000      10.9        19       164        90
WVCT   2025250     91400   14.9500 -114.2400       9.5        29       191        75
WVCT   2025250     91400   14.9400 -114.6600      16.3        23       184       100
WVCT   2025250     91400   14.9300 -115.8500      17.8        42       167        99
WVCT   2025250     91400   14.9100 -116.1100      15.8        37       181       100
WVCT   2025250     91400   14.9300 -116.1500      15.7        35       181        96
WVCT   2025250     91400   14.9600 -116.2800      15.6        28       183        92
WVCT   2025250     91400   14.9400 -116.4300      14.5        15       177        97
WVCT   2025250     91400   14.9400 -116.5400      14.3        15       175        99
WVCT   2025250     91400   14.9000 -116.6500      15.0        26       174        99
WVCT   2025250     91400   14.8800 -116.7000      15.8        30       175       100
WVCT   2025250     91400   14.8700 -116.8300      16.5        34       181        99
WVCT   2025250     91400   14.8700 -117.0600      15.7        36       177        88
WVCT   2025250     91400   14.9400 -117.1800      17.7        37       176        99
WVCT   2025250     91400   14.9200 -117.2300      17.2        37       175        99
WVCT   2025250     91400   14.8600 -117.3600      16.5        45       175        97
WVCT   2025250     91400   14.8800 -117.4900      16.6        39       176        96
WVCT   2025250     91400   14.9000 -117.5500      17.4        32       176        96
WVCT   2025250     91400   14.9300 -117.7200      14.3        37       176        98
WVCT   2025250     91400   14.8900 -117.8300      14.5        35       175        98
WVCT   2025250     91400   14.8500 -117.9200      17.2        34       174        98
WVCT   2025250     91400   14.8500 -118.0500      19.1        41       175        99
WVCT   2025250     91400   14.9300 -118.1400      15.9        39       176        97
WVCT   2025250     91400   14.8800 -118.2100      15.5        27       173        91
WVCT   2025250     91400   14.8400 -118.2800      17.1        25       172       100
WVCT   2025250     91400   14.8400 -118.4700      20.0        38       169       100
WVCT   2025250     91400   14.9200 -118.5000      21.3        34       169       100
WVCT   2025250     91400   14.8600 -118.6800      18.7        38       171        98
WVCT   2025250     91400   14.8600 -118.7000      18.5        39       173        99
WVCT   2025250     91400   14.9100 -118.8200      18.2        42       174        98
WVCT   2025250     91400   14.9100 -118.9900      18.6        37       171        99
WVCT   2025250     91400   14.9100 -119.0100      18.4        36       171        99
WVCT   2025250     91400   14.9100 -119.1100      18.5        39       171       100
WVCT   2025250     91400   14.8200 -119.3100      21.9        51       171       100
WVCT   2025250     91400   14.8200 -119.3300      21.8        51       171       100
WVCT   2025250     91400   14.8600 -119.5000      20.3        47       180        99
WVCT   2025250     91400   14.8400 -119.6000      19.2        39       179        99
WVCT   2025250     91400   14.8700 -119.7200      18.0        38       175        82
WVCT   2025250     91400   14.8900 -119.7400      18.1        40       175        81
WVCT   2025250     91400   14.9500 -109.4300       9.7        30       178        95
WVCT   2025250     91400   14.9500 -109.6500      12.1        32       193        99
WVCT   2025250     91400   14.9500 -109.6700      11.8        35       193        99
WVCT   2025250     91400   14.9400 -109.8400      12.7        62       195       100
WVCT   2025250     91400   14.9600 -110.0000       8.3        94       202        68
WVCT   2025250     91400   14.9600 -110.0300       7.0       102       202        70
WVCT   2025250     91400   15.0100 -110.1300       4.4       128       203        85
WVCT   2025250     91400   14.9700 -110.2800       5.2        94       204        67
WVCT   2025250     91400   14.9800 -110.5600       4.8        73       201        67
WVCT   2025250     91400   15.0000 -110.7000       6.9        87       199        62
WVCT   2025250     91400   15.0000 -110.7700       7.4        90       197        68
WVCT   2025250     91400   14.9700 -110.9400       9.2        81       199        84
WVCT   2025250     91400   14.9900 -111.0000      10.1        75       200        96
WVCT   2025250     91400   14.9100 -111.1100      12.5        80       202        74
WVCT   2025250     91400   14.9400 -111.4800      12.1        64       200        61
WVCT   2025250     91400   14.9100 -111.7400       5.1        19       193        68
WVCT   2025250     91400   14.9300 -113.4200      14.7        16       164        97
WVCT   2025250     91400   14.9100 -113.5300      19.0        23       161        96
WVCT   2025250     91400   14.8700 -113.6900      19.8        23       159        76
WVCT   2025250     91400   14.9100 -113.7100      18.9        25       160        79
WVCT   2025250     91400   14.8400 -113.9200       6.8         8       170        98
WVCT   2025250     91400   14.8600 -113.9400       7.0         9       174        75
WVCT   2025250     91400   14.8400 -114.1000       9.8        18       198        73
WVCT   2025250     91400   14.8400 -114.1700      10.7        16       186        65
WVCT   2025250     91400   14.8300 -114.4800      16.6        36       184        95
WVCT   2025250     91400   14.8700 -114.5400      18.0        33       184        96
WVCT   2025250     91400   14.9000 -114.6400      15.0        24       186       100
WVCT   2025250     91400   14.7900 -116.1000      16.2        40       193        99
WVCT   2025250     91400   14.8300 -116.1600      15.1        40       192        98
WVCT   2025250     91400   14.8500 -116.2700      15.3        32       186        95
WVCT   2025250     91400   14.7800 -116.6500      17.5        32       170        95
WVCT   2025250     91400   14.8200 -116.7300      16.6        32       173        95
WVCT   2025250     91400   14.8500 -116.8700      16.0        32       178       100
WVCT   2025250     91400   14.7900 -116.9900      14.6        29       178       100
WVCT   2025250     91400   14.7900 -117.0100      14.3        27       179        99
WVCT   2025250     91400   14.7900 -117.1200      12.9        29       176        85
WVCT   2025250     91400   14.8500 -117.2600      15.1        44       173        98
WVCT   2025250     91400   14.8400 -117.3700      16.0        45       174        98
WVCT   2025250     91400   14.8200 -117.5000      14.7        34       178        96
WVCT   2025250     91400   14.7600 -117.6300      13.1        29       178        90
WVCT   2025250     91400   14.8000 -117.7100      14.6        27       176        94
WVCT   2025250     91400   14.7800 -117.8000      16.1        27       173        98
WVCT   2025250     91400   14.8100 -117.8600      16.5        32       173        99
WVCT   2025250     91400   14.7700 -118.0100      20.5        39       176       100
WVCT   2025250     91400   14.8300 -118.0900      18.4        40       175       100
WVCT   2025250     91400   14.7500 -118.2700      17.0        31       174       100
WVCT   2025250     91400   14.7500 -118.3800      17.8        31       172        99
WVCT   2025250     91400   14.7500 -118.4000      17.9        32       171        99
WVCT   2025250     91400   14.7800 -118.5600      19.1        38       169        99
WVCT   2025250     91400   14.7600 -118.6900      20.6        40       170       100
WVCT   2025250     91400   14.7400 -118.7400      20.9        39       171       100
WVCT   2025250     91400   14.7600 -118.9000      20.9        37       182       100
WVCT   2025250     91400   14.7500 -119.0100      20.8        36       176       100
WVCT   2025250     91400   14.7500 -119.0300      20.6        36       176       100
WVCT   2025250     91400   14.7300 -119.2200      19.8        39       171       100
WVCT   2025250     91400   14.7500 -119.2600      20.2        43       171       100
WVCT   2025250     91400   14.7300 -119.3400      20.4        44       169        98
WVCT   2025250     91400   14.7400 -119.5300      20.0        40       178        98
WVCT   2025250     91400   14.7600 -119.6100      18.9        33       176       100
WVCT   2025250     91400   14.7400 -119.7400      17.7        26       174        97
WVCT   2025250     91400   14.7200 -119.8500      17.6        27       175        62
WVCT   2025250     91400   14.8900 -109.4500       8.2        40       178        93
WVCT   2025250     91400   14.9100 -109.6300      11.2        44       193        95
WVCT   2025250     91400   14.8900 -109.7600      11.4        64       195        97
WVCT   2025250     91400   14.8800 -109.8500      12.9        76       195        98
WVCT   2025250     91400   14.8800 -109.9200      12.2        88       199        67
WVCT   2025250     91400   14.9100 -110.5300       5.7        75       204        62
WVCT   2025250     91400   14.9000 -110.8400       6.0       102       198        71
WVCT   2025250     91400   14.8500 -111.1700      12.9        73       205        66
WVCT   2025250     91400   14.8900 -111.3000       9.2        55       202        69
WVCT   2025250     91400   14.8200 -111.4500      11.3        49       207        63
WVCT   2025250     91400   14.8200 -111.5200       9.9        51       208        61
WVCT   2025250     91400   14.8200 -111.6400       5.1        20       203        83
WVCT   2025250     91400   14.8600 -111.7200       5.1         9       193        87
WVCT   2025250     91400   14.8300 -113.4500      17.5        21       160        68
WVCT   2025250     91400   14.8100 -113.6400      20.3        20       158        72
WVCT   2025250     91400   14.7500 -113.7600      27.5        25       155        99
WVCT   2025250     91400   14.8000 -114.0800      11.2        19       204        85
WVCT   2025250     91400   14.7800 -114.1100      11.4        18       203        86
WVCT   2025250     91400   14.8000 -114.2200      11.5         9       184        73
WVCT   2025250     91400   14.7500 -114.3600      12.2        25       184        63
WVCT   2025250     91400   14.8100 -114.4600      15.7        37       184        85
WVCT   2025250     91400   14.7200 -116.0700      17.2        38       194        95
WVCT   2025250     91400   14.7000 -116.1000      17.1        37       197        96
WVCT   2025250     91400   14.7300 -116.2000      15.9        35       197       100
WVCT   2025250     91400   14.6800 -116.8100      15.2        30       171        75
WVCT   2025250     91400   14.7600 -116.8900      14.2        28       173        77
WVCT   2025250     91400   14.7500 -117.0400      13.2        22       191        97
WVCT   2025250     91400   14.7500 -117.0600      12.9        21       191        94
WVCT   2025250     91400   14.7300 -117.2500      13.7        43       173        97
WVCT   2025250     91400   14.7300 -117.3600      13.4        38       175        98
WVCT   2025250     91400   14.6900 -117.4500      12.7        27       178        93
WVCT   2025250     91400   14.6900 -117.5400      10.7        26       179        72
WVCT   2025250     91400   14.6600 -117.6700      10.9        28       179        88
WVCT   2025250     91400   14.7200 -117.7900      14.6        27       174        95
WVCT   2025250     91400   14.7400 -117.8100      15.5        28       173        99
WVCT   2025250     91400   14.7000 -117.9200      19.2        38       175        91
WVCT   2025250     91400   14.7100 -118.0600      21.0        40       177        98
WVCT   2025250     91400   14.6900 -118.2200      17.1        34       177        96
WVCT   2025250     91400   14.7100 -118.3000      16.5        33       176        99
WVCT   2025250     91400   14.7300 -118.3600      17.3        31       173        98
WVCT   2025250     91400   14.6500 -118.5400      18.0        27       172       100
WVCT   2025250     91400   14.6500 -118.6200      19.7        31       172        99
WVCT   2025250     91400   14.6400 -118.7100      20.8        31       172        99
WVCT   2025250     91400   14.7200 -118.7800      20.8        37       183        99
WVCT   2025250     91400   14.6600 -118.8700      20.0        31       182        99
WVCT   2025250     91400   14.6800 -118.9700      19.9        32       173        98
WVCT   2025250     91400   14.7100 -119.1600      20.1        36       169       100
WVCT   2025250     91400   14.7100 -119.1800      19.7        36       169       100
WVCT   2025250     91400   14.6300 -119.2900      20.9        35       166       100
WVCT   2025250     91400   14.6300 -119.4200      20.4        37       170        99
WVCT   2025250     91400   14.7000 -119.5400      19.6        37       177        98
WVCT   2025250     91400   14.7000 -119.6800      17.2        31       173        97
WVCT   2025250     91400   14.6600 -119.7900      16.0        31       172        77
WVCT   2025250     91400   14.8200 -109.4800       9.7        53       178        94
WVCT   2025250     91400   14.8100 -109.6500      12.8        64       193        93
WVCT   2025250     91400   14.8100 -109.7500      12.4        79       196        98
WVCT   2025250     91400   14.7300 -111.1400      17.3        68       206        80
WVCT   2025250     91400   14.7500 -111.1600      17.6        68       206        95
WVCT   2025250     91400   14.7800 -111.7100       4.5         5       197        88
WVCT   2025250     91400   14.7200 -111.8200       6.9        27       196        93
WVCT   2025250     91400   14.7500 -111.9000       7.0        36       192        73
WVCT   2025250     91400   14.6700 -113.0300      16.8        34       169       100
WVCT   2025250     91400   14.6700 -113.1200      12.7        23       167        62
WVCT   2025250     91400   14.7400 -113.2200       4.0       315       167        89
WVCT   2025250     91400   14.7300 -113.5800      14.7         9       157        61
WVCT   2025250     91400   14.7200 -114.0300      13.6        26       208        96
WVCT   2025250     91400   14.6400 -114.1300      14.9        21       202        98
WVCT   2025250     91400   14.6800 -114.1700      12.4        12       202        95
WVCT   2025250     91400   14.6300 -114.4900       9.8        17       186        90
WVCT   2025250     91400   14.6900 -114.5900      23.6        28       188        92
WVCT   2025250     91400   14.6800 -115.9900      18.5        42       180        95
WVCT   2025250     91400   14.6600 -116.0800      17.9        39       200        96
WVCT   2025250     91400   14.6400 -116.7100      18.3        33       169        93
WVCT   2025250     91400   14.6600 -116.7900      15.9        31       170        84
WVCT   2025250     91400   14.6200 -116.9900      12.5        15       195        82
WVCT   2025250     91400   14.6200 -117.0100      12.3        12       195        85
WVCT   2025250     91400   14.6000 -117.1400      11.0         2       191        81
WVCT   2025250     91400   14.5900 -117.3200       9.6        40       182        93
WVCT   2025250     91400   14.5900 -117.4200      10.0        25       181        98
WVCT   2025250     91400   14.6300 -117.4400      12.6        26       179        95
WVCT   2025250     91400   14.6300 -117.5900      11.5        33       180        66
WVCT   2025250     91400   14.6400 -117.6700      11.0        26       180        87
WVCT   2025250     91400   14.5700 -117.7700      12.0        18       181        96
WVCT   2025250     91400   14.5600 -117.9100      16.6        30       178        96
WVCT   2025250     91400   14.6000 -117.9700      18.8        35       178        97
WVCT   2025250     91400   14.5800 -118.1700      18.5        36       180        98
WVCT   2025250     91400   14.6100 -118.2500      17.4        35       179       100
WVCT   2025250     91400   14.6100 -118.3500      16.1        34       177       100
WVCT   2025250     91400   14.5500 -118.4600      20.0        40       172       100
WVCT   2025250     91400   14.6300 -118.5200      18.0        29       175       100
WVCT   2025250     91400   14.6200 -118.6700      20.8        31       173       100
WVCT   2025250     91400   14.6200 -118.7100      20.8        30       172        99
WVCT   2025250     91400   14.5400 -118.8700      19.1        26       177        98
WVCT   2025250     91400   14.6000 -119.0000      19.7        32       169       100
WVCT   2025250     91400   14.6200 -119.1100      19.8        34       166        97
WVCT   2025250     91400   14.5800 -119.2200      20.4        38       166        99
WVCT   2025250     91400   14.6100 -119.2800      20.9        35       166       100
WVCT   2025250     91400   14.5300 -119.4100      21.2        36       172       100
WVCT   2025250     91400   14.5300 -119.4500      20.4        35       178       100
WVCT   2025250     91400   14.5300 -119.6400      19.2        43       174        99
WVCT   2025250     91400   14.5300 -119.6600      19.0        42       173        98
WVCT   2025250     91400   14.5300 -119.7800      18.6        44       171        74
WVCT   2025250     91400   14.6200 -110.9800       9.8       171       209        61
WVCT   2025250     91400   14.6400 -111.9000      10.2        35       201        99
WVCT   2025250     91400   14.6600 -111.9200      10.7        35       200       100
WVCT   2025250     91400   14.6200 -112.5400      14.7        38       178        80
WVCT   2025250     91400   14.6400 -112.6300      15.7        30       178        97
WVCT   2025250     91400   14.6600 -112.7400      10.7        10       177        85
WVCT   2025250     91400   14.5800 -112.8400      12.2       357       170        80
WVCT   2025250     91400   14.5900 -113.0400      17.0        33       167        99
WVCT   2025250     91400   14.6500 -113.1000      16.3        32       167        99
WVCT   2025250     91400   14.5900 -113.2000      14.2        15       163        77
WVCT   2025250     91400   14.6000 -113.3300      13.2       356       159        71
WVCT   2025250     91400   14.6200 -113.4900      14.3       355       156        92
WVCT   2025250     91400   14.6400 -113.5100      14.4       354       157        93
WVCT   2025250     91400   14.5500 -114.0300      15.4        29       187        95
WVCT   2025250     91400   14.6000 -114.1400      14.7        21       187        99
WVCT   2025250     91400   14.5600 -114.2300      11.4        19       185        61
WVCT   2025250     91400   14.5700 -114.9200      19.1        23       173        84
WVCT   2025250     91400   14.5200 -115.3600      22.5        22       168        99
WVCT   2025250     91400   14.5400 -116.0300      20.5        43       208       100
WVCT   2025250     91400   14.5400 -116.0500      20.4        42       207       100
WVCT   2025250     91400   14.5100 -116.8100      17.2        36       195        95
WVCT   2025250     91400   14.4900 -116.9400      15.8        26       211        96
WVCT   2025250     91400   14.5000 -117.0700      15.4        14       210        93
WVCT   2025250     91400   14.5600 -117.2100      10.7        18       188        94
WVCT   2025250     91400   14.5600 -117.2600       9.7        31       186        63
WVCT   2025250     91400   14.5300 -117.5400      12.0        30       180        91
WVCT   2025250     91400   14.5300 -117.5800      13.2        33       180        91
WVCT   2025250     91400   14.5300 -117.7500      12.9        22       181       100
WVCT   2025250     91400   14.5100 -117.8600      14.1        21       181        95
WVCT   2025250     91400   14.4800 -117.9700      15.2        25       176        98
WVCT   2025250     91400   14.4800 -118.0100      15.9        25       176        99
WVCT   2025250     91400   14.5000 -118.1300      18.1        37       180       100
WVCT   2025250     91400   14.4800 -118.2200      20.3        44       182       100
WVCT   2025250     91400   14.4600 -118.3500      21.5        44       184       100
WVCT   2025250     91400   14.4900 -118.4900      23.6        47       170       100
WVCT   2025250     91400   14.4700 -118.7100      22.3        37       172       100
WVCT   2025250     91400   14.4700 -118.7300      21.7        35       173       100
WVCT   2025250     91400   14.5200 -118.8700      19.2        26       176        98
WVCT   2025250     91400   14.4500 -118.9600      19.9        27       174       100
WVCT   2025250     91400   14.4800 -119.0600      20.9        35       169        99
WVCT   2025250     91400   14.4400 -119.1700      21.0        41       167       100
WVCT   2025250     91400   14.4800 -119.3100      23.2        43       167       100
WVCT   2025250     91400   14.5100 -119.4300      21.1        36       178       100
WVCT   2025250     91400   14.5100 -119.4500      20.7        35       178       100
WVCT   2025250     91400   14.4700 -119.6500      20.3        43       173        99
WVCT   2025250     91400   14.4500 -119.6900      20.1        42       171        98
WVCT   2025250     91400   14.5100 -119.7900      19.0        44       171        77
WVCT   2025250     91400   14.6300 -109.8300      11.5        73       215        90
WVCT   2025250     91400   14.5700 -109.8900      16.8        54       221        68
WVCT   2025250     91400   14.5900 -110.0000      13.3        54       218        60
WVCT   2025250     91400   14.5700 -110.6600       4.5       122       214        61
WVCT   2025250     91400   14.5900 -111.5400       9.7        23       198        90
WVCT   2025250     91400   14.5800 -111.7200       4.5        35       197        96
WVCT   2025250     91400   14.5000 -111.8100       5.7        35       199        72
WVCT   2025250     91400   14.5200 -111.9900      13.8        33       203        65
WVCT   2025250     91400   14.5200 -112.1000      19.7        34       201        99
WVCT   2025250     91400   14.5400 -112.6000      16.9        40       176        74
WVCT   2025250     91400   14.5200 -112.9000      12.2         2       167        77
WVCT   2025250     91400   14.4800 -112.9500      12.9        14       163        91
WVCT   2025250     91400   14.4900 -113.1000      17.5        33       162        96
WVCT   2025250     91400   14.5300 -113.1900      15.8        26       162        98
WVCT   2025250     91400   14.4700 -113.3300      14.2         8       155        77
WVCT   2025250     91400   14.5400 -113.4600      14.2       359       155        98
WVCT   2025250     91400   14.5200 -113.5000      13.2       359       155        92
WVCT   2025250     91400   14.4500 -113.9200      19.9        36       186        97
WVCT   2025250     91400   14.4700 -113.9600      19.9        35       185        97
WVCT   2025250     91400   14.4700 -114.0500      13.1        24       185        70
WVCT   2025250     91400   14.4500 -114.2100       8.5        25       174        99
WVCT   2025250     91400   14.4400 -114.5800       7.6        10       179        92
WVCT   2025250     91400   14.5100 -114.6800      26.2        21       177        72
WVCT   2025250     91400   14.4900 -114.8400      20.2        18       174        75
WVCT   2025250     91400   14.4900 -114.9300      16.5        20       173        87
WVCT   2025250     91400   14.4900 -115.1300      16.5        23       168        90
WVCT   2025250     91400   14.4300 -115.2000      16.7        19       166        97
WVCT   2025250     91400   14.5000 -115.3400      22.3        24       168       100
WVCT   2025250     91400   14.4100 -115.9000      19.2        44       185        95
WVCT   2025250     91400   14.4500 -115.9200      19.7        44       186        96
WVCT   2025250     91400   14.4100 -116.0300      20.0        44       205        98
WVCT   2025250     91400   14.4700 -116.7500      18.0        39       190        98
WVCT   2025250     91400   14.4700 -116.7800      17.7        39       190        98
WVCT   2025250     91400   14.4500 -116.9300      16.3        30       211        99
WVCT   2025250     91400   14.3900 -117.0900      17.8        27       211        99
WVCT   2025250     91400   14.4400 -117.1200      17.2        22       210        97
WVCT   2025250     91400   14.4200 -117.2700      16.8        34       185        75
WVCT   2025250     91400   14.4200 -117.3200      18.5        41       184        92
WVCT   2025250     91400   14.3900 -117.6000      17.1        43       181       100
WVCT   2025250     91400   14.3900 -117.6400      16.6        43       182       100
WVCT   2025250     91400   14.3700 -117.8100      14.1        42       184       100
WVCT   2025250     91400   14.4500 -117.8400      12.8        27       182        96
WVCT   2025250     91400   14.4400 -118.0400      15.5        28       175       100
WVCT   2025250     91400   14.4400 -118.1200      18.0        38       178       100
WVCT   2025250     91400   14.4200 -118.2500      21.5        47       183        98
WVCT   2025250     91400   14.4200 -118.2900      21.6        47       184        98
WVCT   2025250     91400   14.4000 -118.4000      21.1        42       182        97
WVCT   2025250     91400   14.3600 -118.5500      23.2        47       169        97
WVCT   2025250     91400   14.3900 -118.6700      23.8        46       170        97
WVCT   2025250     91400   14.4100 -118.7300      21.6        39       173       100
WVCT   2025250     91400   14.3500 -118.8000      20.5        38       174       100
WVCT   2025250     91400   14.3900 -118.9300      19.5        29       174        99
WVCT   2025250     91400   14.3500 -119.0600      19.8        30       173        98
WVCT   2025250     91400   14.3600 -119.2000      20.8        39       168        99
WVCT   2025250     91400   14.3400 -119.2200      20.7        38       167        98
WVCT   2025250     91400   14.3400 -119.3900      23.4        42       174        98
WVCT   2025250     91400   14.4000 -119.4300      22.4        43       177        95
WVCT   2025250     91400   14.3600 -119.5800      21.5        49       175        84
WVCT   2025250     91400   14.3400 -119.6600      19.8        45       169        96
WVCT   2025250     91400   14.3900 -119.8200      20.0        44       169        74
VIS    2025250     91400   24.1700 -110.1400      12.5        54       180        98
VIS    2025250     91400   24.1800 -110.1400      12.5        53       180        99
VIS    2025250     91400   24.0300 -113.6200       5.9       140       158        96
VIS    2025250     91400   23.9500 -116.2100      16.9       165       163        98
VIS    2025250     91400   23.9300 -116.2500      12.5       150       163        91
VIS    2025250     91400   23.9500 -116.3800      12.6       130       173        93
VIS    2025250     91400   23.9300 -116.4200      14.7       133       177        95
VIS    2025250     91400   23.9400 -116.4300      15.3       133       177        93
VIS    2025250     91400   23.9300 -116.4800      13.3       136       177       100
VIS    2025250     91400   23.9500 -116.5000      14.1       138       171        99
VIS    2025250     91400   23.9500 -116.5100      14.2       138       168        99
VIS    2025250     91400   23.9500 -116.5400      13.5       140       168        99
VIS    2025250     91400   23.9300 -116.5700      11.6       150       182        98
VIS    2025250     91400   23.9300 -116.6100      11.3       151       182        96
VIS    2025250     91400   23.9400 -116.6500      10.4       157       184        96
VIS    2025250     91400   24.1600 -110.1300      13.1        54       180        96
VIS    2025250     91400   24.0900 -111.2500      11.7        70       173        90
VIS    2025250     91400   24.0900 -111.2800      12.3        71       173        96
VIS    2025250     91400   24.1000 -111.5500       8.2        67       186        96
VIS    2025250     91400   23.9100 -116.2700      12.9       145       178       100
VIS    2025250     91400   23.9100 -116.3100      13.1       147       181        99
VIS    2025250     91400   23.9100 -116.3600      14.0       143       182        99
VIS    2025250     91400   23.9100 -116.3700      13.7       142       179        94
VIS    2025250     91400   23.9200 -116.4200      14.8       134       178        95
VIS    2025250     91400   23.9200 -116.5900      11.1       150       182       100
VIS    2025250     91400   24.1300 -110.0800      10.3        56       179        91
VIS    2025250     91400   24.0700 -111.2300       9.2        87       183        92
VIS    2025250     91400   24.0700 -111.3000      11.3        67       178        97
VIS    2025250     91400   24.0600 -111.3200      10.6        67       177        97
VIS    2025250     91400   24.0100 -113.3500       9.0       143       132        92
VIS    2025250     91400   24.0000 -113.4000       9.6       141       143        96
VIS    2025250     91400   23.8900 -116.2500      13.6       138       186        93
VIS    2025250     91400   23.8900 -116.2700      13.1       140       187       100
VIS    2025250     91400   23.9000 -116.3000      12.9       144       184       100
VIS    2025250     91400   24.1500 -109.0300       9.1        53       187        96
VIS    2025250     91400   24.0900 -110.0600      10.2        48       179        90
VIS    2025250     91400   24.0900 -110.0600       9.8        48       179        91
VIS    2025250     91400   24.1100 -110.0900      10.0        55       179        94
VIS    2025250     91400   24.0600 -111.2300       9.5        87       184        94
VIS    2025250     91400   24.0400 -111.2800       9.9        73       184        97
VIS    2025250     91400   24.0500 -111.3000      10.9        68       178        99
VIS    2025250     91400   24.0400 -111.3400       9.1        63       184        97
VIS    2025250     91400   24.0500 -111.3500      10.0        67       178        93
VIS    2025250     91400   23.9600 -113.4200       6.0       140       142        90
VIS    2025250     91400   23.9700 -113.6500      11.1       134       174        90
VIS    2025250     91400   23.9500 -113.7000      11.1       133       177        95
VIS    2025250     91400   23.8000 -117.9200       8.2       166       808        92
VIS    2025250     91400   24.1300 -108.8900      11.5        45       179        94
VIS    2025250     91400   24.1100 -108.9400      11.7        41       176        93
VIS    2025250     91400   24.1300 -109.0300       8.5        54       183        94
VIS    2025250     91400   24.0300 -111.2800       9.8        73       187        97
VIS    2025250     91400   24.0300 -111.3500       8.6        61       187        93
VIS    2025250     91400   23.9500 -113.5600       6.1       117       160        91
VIS    2025250     91400   23.9400 -113.7000      11.2       133       175        97
VIS    2025250     91400   23.9300 -113.9100       9.8       163       184        94
VIS    2025250     91400   23.9300 -113.9200      10.1       162       184        92
VIS    2025250     91400   23.9100 -114.0600      10.4       157       186        99
VIS    2025250     91400   23.9000 -114.1100       9.8       167       184        95
VIS    2025250     91400   23.7800 -117.8600      10.1       136       710       100
VIS    2025250     91400   23.7800 -118.2000      10.1       118       835        96
VIS    2025250     91400   24.1200 -108.0300       4.0        89       726        96
VIS    2025250     91400   24.1100 -108.8700      10.1        51       170        96
VIS    2025250     91400   24.1100 -108.9100      11.3        42       175        97
VIS    2025250     91400   24.1000 -108.9200      11.5        39       175        95
VIS    2025250     91400   24.0000 -111.3400       9.0        61       181        97
VIS    2025250     91400   23.9100 -113.6900      10.3       129       174        95
VIS    2025250     91400   23.8900 -113.7900      10.1       145       174        93
VIS    2025250     91400   23.9000 -113.8400       9.2       149       178        99
VIS    2025250     91400   23.9000 -113.9700       9.7       169       180        91
VIS    2025250     91400   23.9000 -114.0600      10.6       161       184       100
VIS    2025250     91400   23.8900 -114.1100      10.5       167       182        98
VIS    2025250     91400   23.8800 -114.1200      10.5       165       183        98
VIS    2025250     91400   23.8900 -114.1500       8.5       154       186        98
VIS    2025250     91400   23.7700 -117.8500      10.9       130       746        91
VIS    2025250     91400   23.7400 -118.1900       8.8       178       744        94
VIS    2025250     91400   23.7400 -118.2000       8.6       180       742        91
VIS    2025250     91400   24.1200 -108.0200       4.2        98       724        96
VIS    2025250     91400   24.0600 -108.8600      11.1        39       164        98
VIS    2025250     91400   23.9800 -111.1100       9.4        93       177       100
VIS    2025250     91400   23.9700 -111.1900       9.6        77       176        98
VIS    2025250     91400   23.9000 -113.2900      11.8       131       151        98
VIS    2025250     91400   23.9000 -113.3000      11.7       128       151        95
VIS    2025250     91400   23.8800 -113.6600       5.3       279       174        97
VIS    2025250     91400   23.8700 -113.8200      10.0       154       171        99
VIS    2025250     91400   23.8800 -113.9600       9.5       181       180        97
VIS    2025250     91400   23.8500 -114.0800       9.1       168       180        99
VIS    2025250     91400   23.8600 -114.1000      10.2       167       181        98
VIS    2025250     91400   23.7100 -118.1800       8.5       180       746        92
VIS    2025250     91400   23.7300 -118.2300       8.4       178       745        92
VIS    2025250     91400   24.0500 -108.8600      11.8        38       163        94
VIS    2025250     91400   24.0400 -108.8800      11.1        33       164        95
VIS    2025250     91400   23.9400 -111.1000       8.5        82       166        93
VIS    2025250     91400   23.9500 -111.1900      12.8        58       173        93
VIS    2025250     91400   23.8400 -113.7300       8.8       156       173        95
VIS    2025250     91400   23.8400 -113.7600       8.9       152       172        94
VIS    2025250     91400   23.8300 -113.9600       9.9       168       176       100
VIS    2025250     91400   23.8500 -114.0700       9.0       168       180        97
VIS    2025250     91400   23.7000 -118.1600       8.3       180       751        93
VIS    2025250     91400   24.0100 -108.8700      11.6        34       167        91
VIS    2025250     91400   24.0000 -108.9400       9.0        28       167        93
VIS    2025250     91400   24.0000 -108.9600       9.4        25       168        97
VIS    2025250     91400   24.0100 -108.9900      11.6        19       171        95
VIS    2025250     91400   24.0100 -109.0800      11.5        22       180       100
VIS    2025250     91400   24.0000 -109.1100      10.0        24       183        91
VIS    2025250     91400   23.9100 -111.1400       8.3       100       165        97
VIS    2025250     91400   23.8200 -113.7300       8.3       151       181        99
VIS    2025250     91400   23.8200 -113.7500       8.5       151       174        99
VIS    2025250     91400   23.8300 -113.7800       8.7       148       171        90
VIS    2025250     91400   23.8100 -113.8400       6.9       169       172        93
VIS    2025250     91400   23.8100 -113.9300      10.5       172       173        99
VIS    2025250     91400   23.8200 -113.9500      10.0       168       176        99
VIS    2025250     91400   23.6700 -118.0500       9.0       174       750        97
VIS    2025250     91400   23.6700 -118.0500       8.9       174       750        97
VIS    2025250     91400   23.9800 -108.9200       8.1        31       170        99
VIS    2025250     91400   23.9800 -108.9500       8.1        30       168        93
VIS    2025250     91400   23.9900 -108.9600       8.6        27       168        98
VIS    2025250     91400   23.9900 -109.0700      12.0        20       180        99
VIS    2025250     91400   23.9700 -109.1300       9.2        19       186        95
VIS    2025250     91400   23.9700 -109.1700       8.5        11       188        99
VIS    2025250     91400   23.8900 -111.0700      11.7        95       179       100
VIS    2025250     91400   23.9000 -111.1500       8.9       108       165        98
VIS    2025250     91400   23.7900 -113.7600       6.9       142       174       100
VIS    2025250     91400   23.7800 -113.8800      11.3       170       172        91
VIS    2025250     91400   23.7800 -113.9100      11.7       177       172        98
VIS    2025250     91400   23.8000 -113.9300      10.4       172       172        99
VIS    2025250     91400   23.7800 -113.9600       8.5       170       173        98
VIS    2025250     91400   23.7900 -113.9700       8.7       169       173       100
VIS    2025250     91400   23.7900 -114.1100      10.2       148       179        98
VIS    2025250     91400   23.6400 -118.0900       8.2       170       744        99
VIS    2025250     91400   23.6400 -118.1000       8.2       171       744        99
VIS    2025250     91400   23.6500 -118.1600       8.6       172       706        97
VIS    2025250     91400   23.9700 -108.9200       8.2        31       171        97
VIS    2025250     91400   23.9700 -108.9300       8.1        29       171        96
VIS    2025250     91400   23.9700 -108.9800       7.7        28       170        96
VIS    2025250     91400   23.9700 -109.0700      10.7        18       180        91
VIS    2025250     91400   23.9500 -109.1600       8.2        12       188        99
VIS    2025250     91400   23.8600 -111.0400      11.8        91       176        98
VIS    2025250     91400   23.8800 -111.0700      12.1        93       179        99
VIS    2025250     91400   23.8800 -111.0700      12.4        95       175       100
VIS    2025250     91400   23.8700 -111.2000       8.1       117       166        94
VIS    2025250     91400   23.7800 -113.2300       7.5       117       180        90
VIS    2025250     91400   23.7800 -113.2600       7.3       119       171        97
VIS    2025250     91400   23.7900 -113.3000       6.3       109       171        96
VIS    2025250     91400   23.7900 -113.4300       4.0       150       181        99
VIS    2025250     91400   23.7600 -113.7600       7.6       132       173       100
VIS    2025250     91400   23.7600 -113.7700       7.1       136       172        96
VIS    2025250     91400   23.7600 -113.8400      11.7       165       169        95
VIS    2025250     91400   23.7600 -113.8600      11.5       168       169        95
VIS    2025250     91400   23.7600 -114.0900       7.3       151       175        94
VIS    2025250     91400   23.7600 -114.1200       8.0       148       176        99
VIS    2025250     91400   23.6300 -118.1000       8.2       168       729        99
VIS    2025250     91400   23.6300 -118.1200       8.1       170       729        99
VIS    2025250     91400   23.9300 -109.0100      11.2       356       171        91
VIS    2025250     91400   23.9400 -109.0400      11.4       354       174        90
VIS    2025250     91400   23.9400 -109.1500       7.8        19       188        99
VIS    2025250     91400   23.9200 -109.1700       7.4        18       188        99
VIS    2025250     91400   23.8400 -111.0300      11.7        87       163        92
VIS    2025250     91400   23.8600 -111.0700      12.1        89       170       100
VIS    2025250     91400   23.8300 -111.1300       5.2       144       130        95
VIS    2025250     91400   23.8300 -111.1600       5.8       154       130        94
VIS    2025250     91400   23.7900 -112.7600      12.1       180       187        91
VIS    2025250     91400   23.7700 -113.2500       8.3       120       186        94
VIS    2025250     91400   23.7700 -113.2700       7.7       121       180        98
VIS    2025250     91400   23.7700 -113.3100       6.8       114       172        96
VIS    2025250     91400   23.7400 -113.4700       8.3       131       182        96
VIS    2025250     91400   23.7400 -113.7500       8.7       138       172       100
VIS    2025250     91400   23.7500 -113.8400      12.0       165       169        91
VIS    2025250     91400   23.7400 -114.1600      11.5       151       181        92
VIS    2025250     91400   23.6300 -116.7100      11.7       121       760        98
VIS    2025250     91400   23.6400 -116.7100      11.7       122       750        98
VIS    2025250     91400   23.8900 -109.1200       9.8        27       184        94
VIS    2025250     91400   23.8300 -110.5900       8.7        81       168        99
VIS    2025250     91400   23.8400 -110.6300       8.3        86       169        99
VIS    2025250     91400   23.8300 -110.6500       8.1        88       167        99
VIS    2025250     91400   23.8200 -110.7300       7.6        94       176        94
VIS    2025250     91400   23.8200 -111.0300      12.1        84       156        90
VIS    2025250     91400   23.7400 -112.8800       8.9       179       186        91
VIS    2025250     91400   23.7200 -113.4700       7.6       134       184       100
VIS    2025250     91400   23.7200 -113.5000       8.3       135       184        99
VIS    2025250     91400   23.7100 -113.7400      10.2       143       180        99
VIS    2025250     91400   23.7200 -113.8100       8.3       134       167        97
VIS    2025250     91400   23.7000 -113.9300       6.4       161       164        98
VIS    2025250     91400   23.7000 -113.9400       6.8       157       164        98
VIS    2025250     91400   23.7100 -113.9800       8.1       151       168        92
VIS    2025250     91400   23.6900 -114.1100       6.2       145       176       100
VIS    2025250     91400   23.7100 -114.1200       6.3       140       176        99
VIS    2025250     91400   23.7000 -114.1600       6.6       142       177        96
VIS    2025250     91400   23.6200 -116.7100      11.7       121       760        98
VIS    2025250     91400   23.6200 -116.7200      11.7       121       763        98
VIS    2025250     91400   23.9600 -107.0200      10.8        56       184        94
VIS    2025250     91400   23.8800 -109.1000       9.8        25       183        90
VIS    2025250     91400   23.8600 -109.1500       9.8        19       187       100
VIS    2025250     91400   23.8600 -109.1900       6.0        11       188        93
VIS    2025250     91400   23.8300 -110.5200      10.3        92       185        98
VIS    2025250     91400   23.8200 -110.6000       9.0        78       165        99
VIS    2025250     91400   23.8100 -110.6200       9.0        74       155        99
VIS    2025250     91400   23.8100 -110.6500       7.9        86       160        93
VIS    2025250     91400   23.7400 -112.8000       9.6       183       180        99
VIS    2025250     91400   23.7400 -112.8400       9.0       186       185        94
VIS    2025250     91400   23.7100 -113.4700       7.4       133       184       100
VIS    2025250     91400   23.7000 -113.5100       7.6       136       183        95
VIS    2025250     91400   23.6800 -113.7300       8.9       142       182       100
VIS    2025250     91400   23.6800 -113.8000       9.5       142       167       100
VIS    2025250     91400   23.6900 -113.8200       8.7       139       166        90
VIS    2025250     91400   23.6800 -113.9100       6.2       160       163        95
VIS    2025250     91400   23.6800 -114.0000       6.5       145       171        99
VIS    2025250     91400   23.6900 -114.0200       6.7       155       171        92
VIS    2025250     91400   23.6800 -114.1300       8.0       147       177       100
VIS    2025250     91400   23.8500 -108.8300       8.2        68       172        90
VIS    2025250     91400   23.8600 -108.8300       8.1        70       172        98
VIS    2025250     91400   23.8400 -109.2000       7.1        18       187        96
VIS    2025250     91400   23.8000 -110.6200       8.9        75       151        97
VIS    2025250     91400   23.7100 -112.7500      12.5       189       173        90
VIS    2025250     91400   23.6900 -112.8300       7.8       196       176        91
VIS    2025250     91400   23.7000 -112.9100       9.6       172       184        94
VIS    2025250     91400   23.6800 -112.9500       9.6       165       184        99
VIS    2025250     91400   23.6800 -112.9500       9.5       165       185        99
VIS    2025250     91400   23.6800 -113.5900       9.7       148       186        91
VIS    2025250     91400   23.6500 -113.7700      10.1       144       171       100
VIS    2025250     91400   23.6600 -113.8200      10.1       145       166        99
VIS    2025250     91400   23.6700 -113.8200      10.9       146       166        95
VIS    2025250     91400   23.6500 -113.9000       7.8       134       167        96
VIS    2025250     91400   23.6500 -113.9500       9.6       153       166        98
VIS    2025250     91400   23.6400 -114.0900       8.0       163       178        94
VIS    2025250     91400   23.6400 -114.1200       9.0       153       180        95
VIS    2025250     91400   23.6500 -114.1300       9.0       153       180       100
VIS    2025250     91400   23.8300 -108.6600       9.9        72       151        96
VIS    2025250     91400   23.8300 -108.7400       8.6        57       152        92
VIS    2025250     91400   23.8200 -109.0800       9.1        12       185        98
VIS    2025250     91400   23.8300 -109.1900       8.6        13       185        94
VIS    2025250     91400   23.8200 -109.2100       8.0        17       187        91
VIS    2025250     91400   23.7400 -111.0800      11.4        72       171        93
VIS    2025250     91400   23.7100 -111.7300       4.0        28       183        97
VIS    2025250     91400   23.6600 -112.8200       7.2       211       175        93
VIS    2025250     91400   23.6700 -112.8400       7.9       198       178        97
VIS    2025250     91400   23.6800 -112.9000      10.9       174       181        98
VIS    2025250     91400   23.6600 -112.9300       9.8       164       181        99
VIS    2025250     91400   23.6800 -112.9600       9.5       165       184        98
VIS    2025250     91400   23.6700 -112.9700       9.1       166       185        96
VIS    2025250     91400   23.6300 -113.5900       8.0       137       186       100
VIS    2025250     91400   23.6300 -113.7400       9.3       135       174        99
VIS    2025250     91400   23.6300 -113.7500       9.1       139       174        97
VIS    2025250     91400   23.6300 -113.7900      11.1       151       168        95
VIS    2025250     91400   23.6400 -113.9500      11.5       150       167        90
VIS    2025250     91400   23.6400 -113.9800       9.2       150       168        93
VIS    2025250     91400   23.6200 -114.0400       8.4       153       183       100
VIS    2025250     91400   23.6300 -114.0700       7.8       163       178        98
VIS    2025250     91400   23.6300 -114.0800       8.2       162       180        92
VIS    2025250     91400   23.5200 -117.1400      11.1       127       717       100
VIS    2025250     91400   23.8200 -108.6600       9.8        79       151        91
VIS    2025250     91400   23.8200 -108.7400       8.5        55       152        94
VIS    2025250     91400   23.8100 -108.8000       7.4        67       160        90
VIS    2025250     91400   23.8100 -108.8900       5.8        41       167        95
VIS    2025250     91400   23.8000 -108.9500       8.2        14       170        98
VIS    2025250     91400   23.8000 -109.0800       8.9        14       185        97
VIS    2025250     91400   23.8000 -109.1300      10.4        14       183        95
VIS    2025250     91400   23.7900 -109.1600       9.4        12       184        95
VIS    2025250     91400   23.7900 -109.1700       8.8        11       184        98
VIS    2025250     91400   23.7900 -109.2100       8.4        11       188        99
VIS    2025250     91400   23.7300 -111.0400      12.1        72       187        97
VIS    2025250     91400   23.7200 -111.1200      10.6        65       177        97
VIS    2025250     91400   23.7200 -111.1300      10.9        62       177        97
VIS    2025250     91400   23.6700 -112.4700      11.2       135       175        92
VIS    2025250     91400   23.6700 -112.4800      11.1       136       175        92
VIS    2025250     91400   23.6400 -112.7300       8.8       183       168        91
VIS    2025250     91400   23.6600 -112.8400       7.7       201       178        96
VIS    2025250     91400   23.6500 -112.9300      10.1       164       181        99
VIS    2025250     91400   23.6500 -112.9900       8.8       168       185       100
VIS    2025250     91400   23.6000 -113.6700       7.9       139       185       100
VIS    2025250     91400   23.6100 -113.6900       7.5       130       183        98
VIS    2025250     91400   23.6000 -113.8900       7.5       165       169        90
VIS    2025250     91400   23.6200 -113.9300      11.1       147       167        90
VIS    2025250     91400   23.5900 -113.9700       9.2       151       176        91
VIS    2025250     91400   23.7900 -108.9000       5.5        50       165        98
VIS    2025250     91400   23.7700 -109.0000       8.4        10       176        95
VIS    2025250     91400   23.7700 -109.0500       8.6        15       182        96
VIS    2025250     91400   23.7600 -109.1300      10.2        18       179       100
VIS    2025250     91400   23.7700 -109.1700       8.6        16       183        92
VIS    2025250     91400   23.7600 -109.1800       8.2        15       187        94
VIS    2025250     91400   23.7700 -109.2100       7.4        13       188        94
VIS    2025250     91400   23.7100 -110.7300       8.9        64       180        91
VIS    2025250     91400   23.6200 -112.7200       7.9       193       167        93
VIS    2025250     91400   23.6300 -112.7300       8.1       186       168        93
VIS    2025250     91400   23.6100 -112.9500       9.0       170       176       100
VIS    2025250     91400   23.6200 -112.9900       9.4       169       182        91
VIS    2025250     91400   23.5800 -113.6800       8.0       132       185        96
VIS    2025250     91400   23.5900 -113.6900       8.5       133       182        93
VIS    2025250     91400   23.5800 -113.7300       9.8       139       177        99
VIS    2025250     91400   23.5800 -113.7800       9.8       145       172        90
VIS    2025250     91400   23.5900 -113.9000       7.7       168       169        91
VIS    2025250     91400   23.5700 -113.9300       8.0       162       178        95
VIS    2025250     91400   23.5700 -113.9400       8.0       162       178        94
VIS    2025250     91400   23.5200 -115.9800      11.0       124       745       100
VIS    2025250     91400   23.7400 -108.9900       6.9       359       167        98
VIS    2025250     91400   23.7600 -109.0100       8.3         7       175        95
VIS    2025250     91400   23.7500 -109.1200      10.6        18       176        97
VIS    2025250     91400   23.7500 -109.1600       8.8        18       180        93
VIS    2025250     91400   23.7500 -109.1600       8.8        18       180        92
VIS    2025250     91400   23.7300 -109.2000       8.5        16       183        99
VIS    2025250     91400   23.6800 -110.6900      10.8        54       176        90
VIS    2025250     91400   23.6000 -112.7100       8.0       201       162        95
VIS    2025250     91400   23.6000 -112.8300      10.0       211       175        96
VIS    2025250     91400   23.5900 -112.8700       9.2       201       175        94
VIS    2025250     91400   23.6000 -112.9500       8.0       171       176        97
VIS    2025250     91400   23.5600 -113.7500       9.0       148       175        95
VIS    2025250     91400   23.5500 -113.7800       6.8       158       167        99
VIS    2025250     91400   23.5400 -113.9600       8.1       160       183        92
VIS    2025250     91400   23.7100 -109.1400       9.6        21       173        99
VIS    2025250     91400   23.7200 -109.1400       9.2        20       174       100
VIS    2025250     91400   23.7200 -109.2000       9.4        12       181        95
VIS    2025250     91400   23.7100 -109.2100       9.7        13       182        98
VIS    2025250     91400   23.6600 -110.6500      10.1        45       177        92
VIS    2025250     91400   23.5700 -112.4200      11.3       118       162        98
VIS    2025250     91400   23.5800 -112.4300      11.6       118       166        99
VIS    2025250     91400   23.5600 -112.7300       6.6       210       158        90
VIS    2025250     91400   23.5500 -112.9400       8.1       182       178        97
VIS    2025250     91400   23.5500 -113.0100       6.4       179       186        96
VIS    2025250     91400   23.5300 -113.7900       6.8       156       167        99
VIS    2025250     91400   23.5200 -113.8400       5.7       153       169        98
VIS    2025250     91400   23.5200 -113.8400       5.7       156       168       100
VIS    2025250     91400   23.5300 -113.9200       8.5       158       183        94
VIS    2025250     91400   23.4600 -116.0100       8.3       122       810        90
VIS    2025250     91400   23.6900 -108.7100      12.0        76       160        98
VIS    2025250     91400   23.6900 -108.7200      11.9        75       160        97
VIS    2025250     91400   23.7000 -109.0300       6.9        32       169        97
VIS    2025250     91400   23.6800 -109.0400       6.4        44       169        91
VIS    2025250     91400   23.6900 -109.1200       8.4        25       171        91
VIS    2025250     91400   23.6800 -109.1600       7.5        19       175        96
VIS    2025250     91400   23.6800 -109.1700       7.5        18       178        98
VIS    2025250     91400   23.6700 -109.2100       8.5        15       182        97
VIS    2025250     91400   23.6900 -109.2300       9.1        25       184       100
VIS    2025250     91400   23.5700 -111.8100       4.3        84       169        98
VIS    2025250     91400   23.5500 -112.3800      11.9       122       173       100
VIS    2025250     91400   23.5700 -112.4200      11.2       118       162        97
VIS    2025250     91400   23.5500 -112.9400       8.3       180       178        96
VIS    2025250     91400   23.5200 -112.9800       8.0       176       179        98
VIS    2025250     91400   23.5400 -113.0100       7.2       179       186       100
VIS    2025250     91400   23.5400 -113.0200       7.0       180       186       100
VIS    2025250     91400   23.5100 -113.8200       5.9       152       174        96
VIS    2025250     91400   23.4300 -116.1400      13.6       126       801        97
VIS    2025250     91400   23.4300 -116.1700      13.7       129       820        98
VIS    2025250     91400   23.6700 -108.7300      11.7        73       160        97
VIS    2025250     91400   23.6700 -108.7400      10.2        71       160        96
VIS    2025250     91400   23.6700 -108.7800       8.2        67       158        99
VIS    2025250     91400   23.6600 -108.8900       5.9         1       169       100
VIS    2025250     91400   23.6500 -109.1100       6.4        17       175        98
VIS    2025250     91400   23.6600 -109.1500       6.6        25       178        96
VIS    2025250     91400   23.6600 -109.1600       7.1        23       178        98
VIS    2025250     91400   23.6500 -109.2100       8.3        15       184        99
VIS    2025250     91400   23.6700 -109.2100       8.3        14       183        98
VIS    2025250     91400   23.6600 -109.2500       9.2        13       184        96
VIS    2025250     91400   23.5400 -111.8200       6.5        90       178        94
VIS    2025250     91400   23.5400 -111.8600       4.5        85       183        95
VIS    2025250     91400   23.5400 -112.4000      11.2       120       162        96
VIS    2025250     91400   23.5100 -112.9000       8.5       196       181        97
VIS    2025250     91400   23.5100 -112.9900       7.6       175       179        99
VIS    2025250     91400   23.5000 -113.0300       6.2       182       184        96
VIS    2025250     91400   23.5100 -113.0300       6.4       185       184        98
VIS    2025250     91400   23.4800 -113.8300       6.0       155       183        93
VIS    2025250     91400   23.6600 -108.7300      12.0        72       160        95
VIS    2025250     91400   23.6400 -108.8000       7.2        61       154        98
VIS    2025250     91400   23.6400 -108.8900       6.0        11       169        96
VIS    2025250     91400   23.6400 -108.9200       6.7        11       169        91
VIS    2025250     91400   23.6400 -109.1800       6.1        35       182        94
VIS    2025250     91400   23.5500 -111.1800       8.2        68       883        98
VIS    2025250     91400   23.5600 -111.1900       8.3        66       883        98
VIS    2025250     91400   23.5600 -111.2200       8.4        63       883        98
VIS    2025250     91400   23.5400 -111.7200       5.5        30       187        94
VIS    2025250     91400   23.5300 -111.7600       5.0        37       176        96
VIS    2025250     91400   23.5300 -111.8600       5.1        98       187        97
VIS    2025250     91400   23.4700 -113.0200       5.8       162       180        94
VIS    2025250     91400   23.4800 -113.0200       6.0       169       180        94
VIS    2025250     91400   23.6300 -108.6900      12.9        59       160        98
VIS    2025250     91400   23.6200 -108.7400      12.0        56       157        92
VIS    2025250     91400   23.6100 -109.0500       8.1         6       176        98
VIS    2025250     91400   23.6000 -109.0800       8.0         2       178        93
VIS    2025250     91400   23.6000 -109.1300       8.2       355       180        96
VIS    2025250     91400   23.4600 -113.0300       6.1       164       180        99
VIS    2025250     91400   23.3200 -117.0100       9.9       138       705        95
VIS    2025250     91400   23.5900 -108.7200      13.0        51       160        91
VIS    2025250     91400   23.6000 -108.7600      11.9        53       157        97
VIS    2025250     91400   23.5900 -109.0000       8.1       346       172       100
VIS    2025250     91400   23.5900 -109.0300       7.0        16       176        98
VIS    2025250     91400   23.5700 -109.0800       7.6       356       182        90
VIS    2025250     91400   23.5900 -109.0800       8.0         2       180        93
VIS    2025250     91400   23.5800 -109.1600       7.0       354       182        94
VIS    2025250     91400   23.4400 -113.0100       5.0       161       178       100
VIS    2025250     91400   23.5600 -108.7300      12.5        68       162        91
VIS    2025250     91400   23.5700 -108.7600      11.3        51       163        98
VIS    2025250     91400   23.5600 -108.7700      10.7        51       163        99
VIS    2025250     91400   23.5700 -108.9900      10.0       358       172        99
VIS    2025250     91400   23.5500 -108.7200      10.8        78       171        96
VIS    2025250     91400   23.5500 -108.7500      11.0        57       163        99
VIS    2025250     91400   23.5500 -108.7700      10.4        52       163        99
VIS    2025250     91400   23.5300 -108.8000       8.4        51       166        95
VIS    2025250     91400   23.5500 -108.9800      10.3         1       172        95
VIS    2025250     91400   23.5500 -108.9900      10.2         2       172        97
VIS    2025250     91400   23.5300 -109.0500       8.0       359       182       100
VIS    2025250     91400   23.2800 -115.5400      14.5       168       184        92
VIS    2025250     91400   23.5200 -108.7500       9.4        66       172        99
VIS    2025250     91400   23.5100 -108.7900       8.2        62       167        94
VIS    2025250     91400   23.5200 -108.8200       8.0        53       166        99
VIS    2025250     91400   23.5300 -108.8200       7.9        53       166       100
VIS    2025250     91400   23.5100 -109.0400       8.1         5       178       100
VIS    2025250     91400   23.5000 -109.0700       8.1         1       184        94
VIS    2025250     91400   23.5100 -109.0800       7.9       353       185        94
VIS    2025250     91400   23.5100 -109.1200       8.0       355       187       100
VIS    2025250     91400   23.3700 -112.7400       5.3        44       179        91
VIS    2025250     91400   23.2600 -115.5700      15.5       172       175        92
VIS    2025250     91400   23.2700 -115.5800      15.6       173       176        90
VIS    2025250     91400   23.5200 -107.7200       4.6        81       756        98
VIS    2025250     91400   23.5300 -107.7300       4.5        76       756        99
VIS    2025250     91400   23.4900 -108.7600       8.5        71       174        96
VIS    2025250     91400   23.5000 -108.7900       7.9        61       169        90
VIS    2025250     91400   23.4700 -108.9500       9.4        36       171        90
VIS    2025250     91400   23.2200 -115.6500      14.7       177       185        91
VIS    2025250     91400   23.2300 -115.6800      14.9       177       185        90
VIS    2025250     91400   23.2000 -116.2000      13.2       175       186        92
VIS    2025250     91400   23.5000 -107.7300       4.1        83       756        93
VIS    2025250     91400   23.4600 -108.9200       9.5        39       172        94
VIS    2025250     91400   23.4700 -108.9400       9.5        38       171        92
VIS    2025250     91400   23.4500 -108.9700       7.8        36       175        91
VIS    2025250     91400   23.4300 -108.8800       8.9        27       176        97
VIS    2025250     91400   23.4400 -108.9000       9.3        33       176        95
VIS    2025250     91400   23.4300 -108.9500       8.6        35       175        99
VIS    2025250     91400   23.1900 -115.7400      13.9       168       187        97
VIS    2025250     91400   23.1600 -116.0800      12.7       179       179        93
VIS    2025250     91400   23.4100 -108.5600       8.4        45       164        96
VIS    2025250     91400   23.4100 -108.9000       8.9        28       177        97
VIS    2025250     91400   23.4200 -108.9100       9.1        32       179        96
VIS    2025250     91400   23.4000 -108.9500       8.7        31       176        98
VIS    2025250     91400   23.4000 -108.5600       8.4        46       165        99
VIS    2025250     91400   23.3900 -108.6700       7.6        20       180        93
VIS    2025250     91400   23.3800 -108.5800       8.9        40       165        99
VIS    2025250     91400   23.3700 -108.6700       7.8        18       186        93
VIS    2025250     91400   23.1400 -111.9400       4.7       224       182        95
VIS    2025250     91400   23.2700 -108.6800       4.2         2       186       100
VIS    2025250     91400   23.2300 -108.8000       5.2       355       185        97
VIS    2025250     91400   23.2300 -108.8300       5.2       353       185        97
VIS    2025250     91400   23.2100 -108.8700       5.3       348       184        93
VIS    2025250     91400   23.2100 -108.6100       5.0        31       181        92
VIS    2025250     91400   23.2000 -108.7300       5.0         6       186        90
VIS    2025250     91400   23.1900 -108.8300       6.2         5       181        97
VIS    2025250     91400   23.2000 -108.8500       6.1       359       182       100
VIS    2025250     91400   22.9500 -115.1800      15.0       114       179        91
VIS    2025250     91400   23.1800 -108.5600      10.8        85       166        97
VIS    2025250     91400   23.1600 -108.7800       9.9        33       178        97
VIS    2025250     91400   23.1700 -108.8100       6.5        15       180        90
VIS    2025250     91400   23.1800 -108.8300       6.2         6       181        94
VIS    2025250     91400   23.1800 -108.8500       6.4         6       180        92
VIS    2025250     91400   23.1600 -109.2400       7.1        34       183        92
VIS    2025250     91400   22.9400 -115.1500      15.0       114       179        91
VIS    2025250     91400   23.1500 -108.5200      10.8        90       138        94
VIS    2025250     91400   23.1700 -108.5400      11.3        91       163        91
VIS    2025250     91400   23.1600 -108.5800      11.7        90       168        99
VIS    2025250     91400   23.1400 -108.6200      11.0        89       168        98
VIS    2025250     91400   23.1400 -108.6500      11.0        90       174        99
VIS    2025250     91400   23.1400 -108.7300       8.1        23       183        92
VIS    2025250     91400   23.1300 -108.9500       4.5         7       175        93
VIS    2025250     91400   23.1300 -108.9800       4.7        18       175       100
VIS    2025250     91400   23.1400 -109.0400       5.1       349       180        98
VIS    2025250     91400   23.1400 -109.0600       4.3       340       174        92
VIS    2025250     91400   23.1200 -109.1800       8.0       351       182        92
VIS    2025250     91400   23.1300 -109.1800       7.5       352       182        94
VIS    2025250     91400   23.1200 -109.2200       5.3       353       183        94
VIS    2025250     91400   22.9000 -115.1600      12.2       138       180        91
VIS    2025250     91400   23.1200 -108.5400      11.4        85       130        97
VIS    2025250     91400   23.1400 -108.5700      11.7        85       148        94
VIS    2025250     91400   23.1200 -108.6100      11.5        87       160        95
VIS    2025250     91400   23.1300 -108.6400      11.9        90       168        98
VIS    2025250     91400   23.1100 -108.6800      12.5        90       159        91
VIS    2025250     91400   23.1000 -108.9300       4.6         0       170       100
VIS    2025250     91400   23.1000 -108.9600       5.3        19       167        95
VIS    2025250     91400   23.1000 -108.9900       6.2        24       165        92
VIS    2025250     91400   23.1000 -109.0300       8.5        10       161       100
VIS    2025250     91400   23.1100 -109.1000       4.1       340       171        95
VIS    2025250     91400   23.1100 -109.1100       4.4       340       171        92
VIS    2025250     91400   23.1000 -109.1400       6.1       347       174        99
VIS    2025250     91400   23.1100 -109.1700       8.4       351       177        95
VIS    2025250     91400   23.0900 -109.2300       4.8         8       183        98
VIS    2025250     91400   22.8700 -115.1100      12.1       135       182        99
VIS    2025250     91400   22.8800 -115.1400      11.9       136       178        99
VIS    2025250     91400   23.1000 -108.5000      11.4        88       119        92
VIS    2025250     91400   23.1100 -108.5500      11.5        82       130        96
VIS    2025250     91400   23.1100 -108.6000      11.2        85       147        92
VIS    2025250     91400   23.1100 -108.6200      11.5        87       156        96
VIS    2025250     91400   23.1100 -108.6700      12.6        89       154        90
VIS    2025250     91400   23.1000 -108.7200       9.2        81       157        98
VIS    2025250     91400   23.1000 -108.9600       5.5        18       165        93
VIS    2025250     91400   23.1000 -108.9900       6.5        22       165        92
VIS    2025250     91400   23.0800 -109.0600       7.6        12       161        98
VIS    2025250     91400   23.0700 -109.1000       5.4         1       166        99
VIS    2025250     91400   23.0900 -109.1100       4.5       345       169       100
VIS    2025250     91400   23.0800 -109.1300       4.6       352       173        97
VIS    2025250     91400   23.0700 -109.1800       7.3       352       176        96
VIS    2025250     91400   23.0700 -109.2200       6.2         1       180        93
VIS    2025250     91400   23.0900 -109.2200       5.2         7       183        96
VIS    2025250     91400   22.8700 -115.1300      11.4       136       182        97
VIS    2025250     91400   23.0700 -108.4700      11.5        72       121        94
VIS    2025250     91400   23.0700 -108.5700       9.2        71       136        96
VIS    2025250     91400   23.0600 -109.0000       7.6        18       163        92
VIS    2025250     91400   23.0500 -109.0500       7.2        17       163        98
VIS    2025250     91400   23.0400 -109.1100       6.6        11       166        99
VIS    2025250     91400   23.0600 -109.1300       5.1         1       169       100
VIS    2025250     91400   23.0600 -109.1600       6.1       353       176        96
VIS    2025250     91400   23.0600 -109.1700       6.4       353       176        95
VIS    2025250     91400   23.0500 -109.2300       6.0       350       183        96
VIS    2025250     91400   23.0500 -109.2400       5.7       354       184        96
VIS    2025250     91400   23.0500 -108.5300      10.6        73       134       100
VIS    2025250     91400   23.0400 -108.5600       9.8        73       139        98
VIS    2025250     91400   23.0500 -108.5700       9.1        74       139        94
VIS    2025250     91400   23.0500 -108.6300      10.8        72       139        90
VIS    2025250     91400   23.0200 -108.9500       8.0        25       159        90
VIS    2025250     91400   23.0300 -109.0300       7.3        18       163        96
VIS    2025250     91400   23.0400 -109.0700       7.1        16       163       100
VIS    2025250     91400   23.0300 -109.1000       7.0        15       166        99
VIS    2025250     91400   23.0400 -109.1100       6.8        12       167        98
VIS    2025250     91400   23.0200 -109.1800       7.5       346       179        92
VIS    2025250     91400   23.0300 -109.1800       6.9       348       178        96
VIS    2025250     91400   23.0300 -109.2400       5.9       349       183        98
VIS    2025250     91400   23.0200 -108.5300       9.7        77       134        93
VIS    2025250     91400   23.0100 -108.7900       4.6        30       153        98
VIS    2025250     91400   23.0000 -108.8300      10.6         6       155        95
VIS    2025250     91400   23.0000 -108.9800       8.2        17       162        93
VIS    2025250     91400   23.0200 -109.0100       8.3        19       162        91
VIS    2025250     91400   23.0200 -109.0600       7.4        12       164        99
VIS    2025250     91400   23.0100 -109.0800       7.3        12       167        99
VIS    2025250     91400   23.0100 -109.1100       7.2         9       169        99
VIS    2025250     91400   22.9900 -109.1600       8.6       345       179        98
VIS    2025250     91400   23.0000 -109.1800       8.2       343       181        99
VIS    2025250     91400   23.0000 -109.2300       7.2       352       181        97
VIS    2025250     91400   23.0000 -109.2700       8.2       343       182        92
VIS    2025250     91400   22.7800 -114.8800      15.3       138       186        91
VIS    2025250     91400   22.7500 -115.8000       8.8       131       709        90
VIS    2025250     91400   22.9900 -108.4200      11.6        72       131        95
VIS    2025250     91400   23.0000 -108.4500      10.4        71       121        90
VIS    2025250     91400   23.0000 -108.8000       5.0        32       153       100
VIS    2025250     91400   22.9700 -108.8900      10.4        21       163        94
VIS    2025250     91400   22.9700 -108.9200       8.6        12       159        99
VIS    2025250     91400   22.9900 -108.9800       8.1        13       165        91
VIS    2025250     91400   22.9700 -109.0100       9.6        12       166        95
VIS    2025250     91400   22.9700 -109.0600       9.0        13       171        93
VIS    2025250     91400   22.9900 -109.0700       8.8         9       168        92
VIS    2025250     91400   22.9900 -109.1000       7.5         8       171        97
VIS    2025250     91400   22.9800 -109.1600       8.6       347       179        97
VIS    2025250     91400   22.9800 -109.1600       8.6       345       180        96
VIS    2025250     91400   22.9600 -109.2000       8.1       353       181        99
VIS    2025250     91400   22.9600 -109.2400       8.0         6       180        96
VIS    2025250     91400   22.7700 -114.9000      14.3       136       186        94
VIS    2025250     91400   22.7300 -115.7900       9.1       129       737        94
VIS    2025250     91400   22.7100 -116.0000       9.9       128       778        95
VIS    2025250     91400   22.7100 -116.0400      10.8       130       793        94
VIS    2025250     91400   22.7300 -116.0700      11.8       133       744        99
VIS    2025250     91400   22.7300 -116.1100      10.7       131       744        94
VIS    2025250     91400   22.7200 -116.1400      10.6       129       781        94
VIS    2025250     91400   22.7100 -116.1900      11.5       125       707        98
VIS    2025250     91400   22.7100 -116.1900      11.5       125       706        98
VIS    2025250     91400   22.9800 -108.4200      11.4        74       134        97
VIS    2025250     91400   22.9700 -108.4300      11.6        75       140        95
VIS    2025250     91400   22.9600 -108.5200      11.9        71       137        96
VIS    2025250     91400   22.9600 -108.6800       8.3        66       161        99
VIS    2025250     91400   22.9500 -108.7400       8.1        63       163        93
VIS    2025250     91400   22.9600 -108.7700       7.0        57       165        91
VIS    2025250     91400   22.9700 -108.8600       9.9        27       163        91
VIS    2025250     91400   22.9600 -108.8800       9.8        26       163        97
VIS    2025250     91400   22.9700 -108.9100       9.1        14       160        98
VIS    2025250     91400   22.9500 -108.9500       8.9         6       165        98
VIS    2025250     91400   22.9600 -109.0100       9.7        14       169        91
VIS    2025250     91400   22.9600 -109.0700       8.8        18       172        90
VIS    2025250     91400   22.9600 -109.1100       7.9        12       175        92
VIS    2025250     91400   22.9500 -109.1400       8.7         1       179        94
VIS    2025250     91400   22.9500 -109.1700       9.0       352       181        90
VIS    2025250     91400   22.9600 -109.2000       8.8       349       181        95
VIS    2025250     91400   22.9600 -109.2500       8.2         6       179        95
VIS    2025250     91400   22.9500 -109.2600       8.7         3       180        95
VIS    2025250     91400   22.7200 -115.7800       9.2       128       735        94
VIS    2025250     91400   22.7000 -115.9800       9.2       127       784        93
VIS    2025250     91400   22.6900 -116.0100       9.9       121       839        94
VIS    2025250     91400   22.6900 -116.1200      10.2       137       781        95
VIS    2025250     91400   22.7000 -116.1300      10.4       131       796        93
VIS    2025250     91400   22.6800 -116.1900      11.0       124       828        95
VIS    2025250     91400   22.6800 -116.2000      11.2       126       738        92
VIS    2025250     91400   22.7000 -116.2200      11.8       127       706        98
VIS    2025250     91400   22.9600 -108.4300      11.4        75       141        95
VIS    2025250     91400   22.9500 -108.4600      12.6        77       140        94
VIS    2025250     91400   22.9400 -108.5000      13.7        77       140        94
VIS    2025250     91400   22.9400 -108.5200      12.8        74       148        96
VIS    2025250     91400   22.9400 -108.5800      11.9        64       148        95
VIS    2025250     91400   22.9500 -108.6000      11.2        63       149        90
VIS    2025250     91400   22.9300 -108.6200      11.2        65       159        99
VIS    2025250     91400   22.9300 -108.7400       8.8        60       165        98
VIS    2025250     91400   22.9300 -108.7500       8.7        59       166        98
VIS    2025250     91400   22.9300 -108.7800       8.9        61       170        91
VIS    2025250     91400   22.9400 -108.9000       9.2        27       163        97
VIS    2025250     91400   22.9400 -108.9300       8.8         8       164        98
VIS    2025250     91400   22.9400 -108.9400       8.8         5       165        97
VIS    2025250     91400   22.9300 -108.9700       8.5       360       165        96
VIS    2025250     91400   22.9200 -109.1100       7.0       352       184        93
VIS    2025250     91400   22.9300 -109.1400       8.3         0       185       100
VIS    2025250     91400   22.6900 -115.7200       9.1       134       729        94
VIS    2025250     91400   22.6800 -116.0100      10.1       119       839        93
VIS    2025250     91400   22.6800 -116.0300      10.7       117       842        91
VIS    2025250     91400   22.6700 -116.1400      10.3       132       834        99
VIS    2025250     91400   22.6800 -116.2000      11.3       126       741        91
VIS    2025250     91400   22.9100 -108.4900      10.6        78       165        95
VIS    2025250     91400   22.9200 -108.5100      12.3        77       154        97
VIS    2025250     91400   22.9300 -108.5300      12.4        72       152        97
VIS    2025250     91400   22.9300 -108.5700      12.2        64       149        94
VIS    2025250     91400   22.9100 -108.6200      12.0        67       173       100
VIS    2025250     91400   22.9200 -108.6400      11.7        68       170        99
VIS    2025250     91400   22.9100 -108.7200       8.4        62       174        93
VIS    2025250     91400   22.9200 -108.7600       8.8        61       170        99
VIS    2025250     91400   22.8900 -108.9400       7.0         6       170        98
VIS    2025250     91400   22.9100 -108.9600       7.4         0       168       100
VIS    2025250     91400   22.9100 -108.9800       7.7         5       170        99
VIS    2025250     91400   22.9000 -109.1000       7.1        12       187        95
VIS    2025250     91400   22.8900 -109.1400       7.3       347       187        91
VIS    2025250     91400   22.6400 -116.2000      11.1       132       813        96
VIS    2025250     91400   22.9100 -108.5100      10.8        77       167        96
VIS    2025250     91400   22.9000 -108.5300      11.0        72       167        96
VIS    2025250     91400   22.8900 -108.5600      10.7        69       169       100
VIS    2025250     91400   22.8800 -108.5900      11.2        67       173        96
VIS    2025250     91400   22.9000 -108.6200      12.0        67       173       100
VIS    2025250     91400   22.8800 -108.6600      11.4        67       179       100
VIS    2025250     91400   22.8800 -108.6800      11.2        67       181        97
VIS    2025250     91400   22.9000 -108.7100      10.0        65       181        94
VIS    2025250     91400   22.8800 -108.7700       5.5        40       182        92
VIS    2025250     91400   22.8700 -108.8400       7.4        27       178        99
VIS    2025250     91400   22.8800 -108.9000       9.1        45       173        92
VIS    2025250     91400   22.8900 -108.9500       6.5        10       170       100
VIS    2025250     91400   22.7600 -112.2400       8.3       244       182        90
VIS    2025250     91400   22.8800 -108.4900       7.1        75       171        91
VIS    2025250     91400   22.8800 -108.5100       7.7        75       167        91
VIS    2025250     91400   22.8700 -108.5500       7.5        70       170        97
VIS    2025250     91400   22.8800 -108.5800      10.4        68       171        97
VIS    2025250     91400   22.8800 -108.6300      10.7        66       176        96
VIS    2025250     91400   22.8700 -108.6600      11.2        66       179        99
VIS    2025250     91400   22.8700 -108.6700      10.9        65       181        99
VIS    2025250     91400   22.8700 -108.7700       5.0        38       183        95
VIS    2025250     91400   22.8500 -108.9200       8.8        49       178        99
VIS    2025250     91400   22.8500 -108.9600       7.7        34       181        90
VIS    2025250     91400   22.8500 -108.9600       7.6        34       182        92
VIS    2025250     91400   22.5800 -116.2300       9.8       142       731        93
VIS    2025250     91400   22.8400 -108.6500       7.4        57       176        96
VIS    2025250     91400   22.8400 -108.9000       8.7        44       181        94
VIS    2025250     91400   22.7000 -111.1200       4.7       280       128        97
VIS    2025250     91400   22.7000 -110.8900       6.9        69       124        91
VIS    2025250     91400   22.6800 -111.5900       4.0       241       165        90
VIS    2025250     91400   22.6500 -112.2500       4.9       241       180        97
VIS    2025250     91400   22.6300 -112.4000       4.3       202       175        92
VIS    2025250     91400   22.6300 -112.4700       4.5       221       184       100
VIS    2025250     91400   22.5200 -115.6100      10.6       114       711        98
VIS    2025250     91400   22.5200 -115.6300       9.8       115       765        98
VIS    2025250     91400   22.5200 -116.1900       9.5       143       702        92
VIS    2025250     91400   22.6200 -112.1400       4.1       254       182        96
VIS    2025250     91400   22.6300 -112.3600       4.5       172       172        92
VIS    2025250     91400   22.6100 -112.3800       4.9       171       172        90
VIS    2025250     91400   22.6300 -112.4000       4.3       196       174        96
VIS    2025250     91400   22.6100 -112.5100       5.1       221       181        95
VIS    2025250     91400   22.6000 -112.5200       5.1       222       181        95
VIS    2025250     91400   22.5000 -115.6500      10.3       117       767       100
VIS    2025250     91400   22.5000 -116.1500      11.4       135       742       100
VIS    2025250     91400   22.7300 -108.6900       8.3        70       158        97
VIS    2025250     91400   22.7300 -108.8200       5.7        56       166        97
VIS    2025250     91400   22.6000 -111.8500       4.8       286       167        96
VIS    2025250     91400   22.6000 -111.8500       4.7       286       167        95
VIS    2025250     91400   22.5800 -112.2800       4.0       155       173        94
VIS    2025250     91400   22.6000 -112.3700       5.0       165       170        95
VIS    2025250     91400   22.5700 -112.5100       4.8       220       181        98
VIS    2025250     91400   22.5800 -112.5400       5.1       230       186        95
VIS    2025250     91400   22.4900 -115.6500      10.3       117       767       100
VIS    2025250     91400   22.4700 -115.6700      11.2       123       770        96
VIS    2025250     91400   22.4600 -116.0700      10.8       129       814        99
VIS    2025250     91400   22.4500 -116.1200      11.9       130       719       100
VIS    2025250     91400   22.4600 -116.1300      11.5       130       723        99
VIS    2025250     91400   22.6900 -108.7000       8.5        68       164        99
VIS    2025250     91400   22.6900 -108.7300       9.2        63       162        97
VIS    2025250     91400   22.7100 -108.7500       9.1        55       158        90
VIS    2025250     91400   22.6900 -108.7900       8.4        52       158        96
VIS    2025250     91400   22.7100 -108.8300       6.0        62       163        93
VIS    2025250     91400   22.6900 -108.8700       5.7        57       163        95
VIS    2025250     91400   22.6900 -108.8900       6.9        57       165       100
VIS    2025250     91400   22.7000 -108.9400       8.1        56       177        98
VIS    2025250     91400   22.6900 -108.9400       8.0        53       176        97
VIS    2025250     91400   22.5700 -111.8300       5.1       282       165        94
VIS    2025250     91400   22.5800 -111.8400       5.1       284       165        94
VIS    2025250     91400   22.5700 -111.9800      10.2       245       180        90
VIS    2025250     91400   22.5700 -112.2500       4.1       139       173        92
VIS    2025250     91400   22.5500 -112.4700       4.4       206       177        92
VIS    2025250     91400   22.5600 -112.4700       4.8       204       177        95
VIS    2025250     91400   22.5500 -112.5200       4.4       225       182        99
VIS    2025250     91400   22.5700 -112.5500       4.6       238       184        98
VIS    2025250     91400   22.4400 -115.6600      10.6       119       728       100
VIS    2025250     91400   22.4500 -116.0900      12.4       128       834        98
VIS    2025250     91400   22.4300 -116.1200      11.9       130       719       100
VIS    2025250     91400   22.4400 -116.1500      10.6       134       708        98
VIS    2025250     91400   22.6700 -108.7200       8.5        70       179        96
VIS    2025250     91400   22.6700 -108.7500       8.1        59       165        98
VIS    2025250     91400   22.6800 -108.7700       8.7        54       165        90
VIS    2025250     91400   22.6700 -108.8300       8.2        63       165        98
VIS    2025250     91400   22.6800 -108.8600       6.7        63       163       100
VIS    2025250     91400   22.6700 -108.8700       6.7        65       165       100
VIS    2025250     91400   22.6700 -108.9300       6.4        55       165        95
VIS    2025250     91400   22.6800 -108.9300       7.3        54       167        97
VIS    2025250     91400   22.6700 -108.9700       7.5        37       176        90
VIS    2025250     91400   22.6600 -109.0000       7.2        37       180        92
VIS    2025250     91400   22.5600 -112.0000      10.4       246       180        91
VIS    2025250     91400   22.5300 -112.4100       4.2       249       167        99
VIS    2025250     91400   22.5300 -112.4600       4.1       223       176        92
VIS    2025250     91400   22.5400 -112.4700       4.1       215       176        94
VIS    2025250     91400   22.5400 -112.5200       4.2       228       183        99
VIS    2025250     91400   22.4200 -116.1500      12.2       128       702        99
VIS    2025250     91400   22.6600 -108.7200       8.4        71       185        94
VIS    2025250     91400   22.6400 -108.7900       6.3        54       182        95
VIS    2025250     91400   22.6500 -108.8100       7.4        53       168        92
VIS    2025250     91400   22.6500 -108.9000       5.8        61       165       100
VIS    2025250     91400   22.6400 -108.9100       5.7        51       165        97
VIS    2025250     91400   22.6500 -108.9400       6.1        45       167        98
VIS    2025250     91400   22.6300 -109.0000       6.9        42       179        98
VIS    2025250     91400   22.6300 -109.0100       6.7        45       179        99
VIS    2025250     91400   22.6400 -109.0300       7.0        31       184        99
VIS    2025250     91400   22.5600 -111.2400      11.3       347       141        99
VIS    2025250     91400   22.5000 -112.4300       5.2       251       172       100
VIS    2025250     91400   22.5000 -112.4500       5.2       252       172       100
VIS    2025250     91400   22.6300 -108.9700       6.8        45       173        98
VIS    2025250     91400   22.6200 -109.0100       6.9        46       180       100
VIS    2025250     91400   22.6000 -109.0300       6.1        46       182       100
VIS    2025250     91400   22.6100 -109.0700       6.4        18       186        99
VIS    2025250     91400   22.5300 -110.9800       6.1       205       153        94
VIS    2025250     91400   22.5400 -111.2400      11.3       347       142       100
VIS    2025250     91400   22.5300 -111.2500      11.1       348       141       100
VIS    2025250     91400   22.4800 -112.3100       4.2       227       181       100
VIS    2025250     91400   22.4800 -112.3200       4.2       229       181       100
VIS    2025250     91400   22.4800 -112.3500       4.3       238       182        98
VIS    2025250     91400   22.4900 -112.4200       4.4       254       174        99
VIS    2025250     91400   22.4800 -112.4400       5.0       257       174        99
VIS    2025250     91400   22.6000 -109.0400       5.9        43       183       100
VIS    2025250     91400   22.5400 -110.0700       6.1        45       782        96
VIS    2025250     91400   22.4800 -111.9400       7.9       342       181        93
VIS    2025250     91400   22.4700 -112.4400       4.2       258       176        94
VIS    2025250     91400   22.5300 -110.0700       6.1        46       782        95
VIS    2025250     91400   22.5100 -110.1000       6.2        36       816        98
VIS    2025250     91400   22.4400 -111.8200       5.9       297       179        99
VIS    2025250     91400   22.4600 -111.9500       8.3       342       182        94
VIS    2025250     91400   22.5000 -109.7900       6.6        32       180        94
VIS    2025250     91400   22.4900 -110.0900       6.1        41       814        96
VIS    2025250     91400   22.4800 -110.1000       6.1        37       814       100
VIS    2025250     91400   22.4900 -110.1300       6.5        30       814        99
VIS    2025250     91400   22.4800 -109.8200       5.6        29       174        94
VIS    2025250     91400   22.4000 -111.8200       5.5       279       176       100
VIS    2025250     91400   22.4500 -109.8700       6.5        15       178        94
VIS    2025250     91400   22.4100 -110.6500      27.5       132       116        92
VIS    2025250     91400   22.4200 -110.6900      27.3       133       116        90
VIS    2025250     91400   22.3900 -111.3600       5.1       334       160        98
VIS    2025250     91400   22.4000 -111.3700       5.1       345       160        95
VIS    2025250     91400   22.4100 -109.8700       8.1        13       176        98
VIS    2025250     91400   22.4100 -109.8700       8.2        11       178        98
VIS    2025250     91400   22.3700 -111.0800       6.8       284       170        94
VIS    2025250     91400   22.3600 -111.2600       5.2       311       165       100
VIS    2025250     91400   22.3700 -111.3100       4.2       331       165        97
VIS    2025250     91400   22.3800 -111.3600       5.1       336       160        94
VIS    2025250     91400   22.3400 -111.0400       7.5       294       152        93
VIS    2025250     91400   22.3500 -111.0700       7.0       295       170        95
VIS    2025250     91400   22.3600 -111.0800       6.6       284       172        97
VIS    2025250     91400   22.3400 -111.1300       6.7       287       178       100
VIS    2025250     91400   22.3400 -111.2500       5.1       326       164       100
VIS    2025250     91400   22.3400 -111.0400       7.6       293       152        91
VIS    2025250     91400   22.3300 -111.0800       7.0       293       173        90
VIS    2025250     91400   22.3600 -109.7400       4.6       322       160        90
VIS    2025250     91400   22.3500 -109.7500       5.1       331       160        99
VIS    2025250     91400   22.2900 -111.0300       7.0       312       175        95
VIS    2025250     91400   22.3000 -111.0300       7.4       310       175        97
VIS    2025250     91400   22.1800 -114.2900      12.6       110       739        99
VIS    2025250     91400   22.3200 -109.8200       7.6       354       165        96
VIS    2025250     91400   22.3300 -109.8400       8.0       352       173        90
VIS    2025250     91400   22.3100 -109.9900       7.2       309       175        96
VIS    2025250     91400   22.3200 -110.0200       7.3       305       176        94
VIS    2025250     91400   22.2700 -110.9900       6.2       309       159        98
VIS    2025250     91400   22.2600 -111.1000       7.1       310       182        99
VIS    2025250     91400   22.2600 -111.1300       7.6       315       180        98
VIS    2025250     91400   22.2600 -111.1600       7.6       309       175        94
VIS    2025250     91400   22.1400 -114.5800      14.5       115       838        98
VIS    2025250     91400   22.3000 -109.8400       7.4       351       166        97
VIS    2025250     91400   22.2800 -110.0000       6.2       316       180        99
VIS    2025250     91400   22.2500 -110.9800       5.9       322       142       100
VIS    2025250     91400   22.2600 -111.0000       6.3       307       168        97
VIS    2025250     91400   22.2500 -111.1000       6.5       306       180       100
VIS    2025250     91400   22.2300 -111.1400       6.7       308       173        97
VIS    2025250     91400   22.2500 -111.1600       6.9       308       170        98
VIS    2025250     91400   22.2500 -111.1700       6.9       305       170        97
VIS    2025250     91400   22.1100 -114.5500      12.6       112       711       100
VIS    2025250     91400   22.1200 -114.5800      14.0       110       773        99
VIS    2025250     91400   22.1200 -114.5800      14.1       110       870        98
VIS    2025250     91400   22.1100 -114.6200      11.6       118       746       100
VIS    2025250     91400   22.2600 -109.9100       8.0       317       169        96
VIS    2025250     91400   22.2400 -110.8700       7.7       345       121        93
VIS    2025250     91400   22.2200 -110.9100       6.1       349       133        97
VIS    2025250     91400   22.2300 -110.9400       5.9       334       133       100
VIS    2025250     91400   22.2300 -110.9900       6.8       318       153        99
VIS    2025250     91400   22.2300 -110.9900       7.0       314       159        98
VIS    2025250     91400   22.2300 -111.0700       6.7       287       185        95
VIS    2025250     91400   22.2300 -111.0900       6.3       298       180        99
VIS    2025250     91400   22.2200 -111.1400       6.9       307       173        99
VIS    2025250     91400   22.2100 -111.1500       6.8       305       170        99
VIS    2025250     91400   22.0900 -114.5200      12.6       119       717       100
VIS    2025250     91400   22.1100 -114.5400      12.5       113       712       100
VIS    2025250     91400   22.1100 -114.5700      13.6       110       738        99
VIS    2025250     91400   22.1100 -114.6200      12.5       118       736        99
VIS    2025250     91400   22.2500 -109.6500       8.5        74       159       100
VIS    2025250     91400   22.2500 -109.8400       9.0       318       167        93
VIS    2025250     91400   22.2300 -109.9100      10.0       317       169       100
VIS    2025250     91400   22.2300 -109.9100       9.8       318       169        99
VIS    2025250     91400   22.2000 -110.8800       6.6       348       126        99
VIS    2025250     91400   22.2100 -110.9100       6.0       348       133        97
VIS    2025250     91400   22.2100 -110.9400       5.3       341       133       100
VIS    2025250     91400   22.1900 -110.9900       9.2       316       179       100
VIS    2025250     91400   22.0900 -114.4600      12.8       117       716        99
VIS    2025250     91400   22.0600 -114.6100      14.1       126       776        96
VIS    2025250     91400   22.0700 -114.6400      14.0       121       721        99
VIS    2025250     91400   22.2500 -109.1300       7.7       297       187        98
VIS    2025250     91400   22.2500 -109.1500       7.9       295       187        99
VIS    2025250     91400   22.2400 -109.2400       5.2       306       182       100
VIS    2025250     91400   22.2300 -109.6200       8.8        65       169        96
VIS    2025250     91400   22.2300 -109.6500       8.3        71       158        99
VIS    2025250     91400   22.2200 -109.8700      10.3       316       167        91
VIS    2025250     91400   22.1900 -110.8200       7.4         3       117        91
VIS    2025250     91400   22.1700 -110.8400       7.2         1       120        94
VIS    2025250     91400   22.1800 -110.8800       6.8       348       132       100
VIS    2025250     91400   22.1800 -110.9000       6.8       347       133       100
VIS    2025250     91400   22.1800 -110.9400       6.8       344       141        95
VIS    2025250     91400   22.1700 -110.9600       8.9       324       170        96
VIS    2025250     91400   22.1600 -110.9900       9.9       322       179       100
VIS    2025250     91400   22.0400 -114.3200      12.9       109       708       100
VIS    2025250     91400   22.2200 -109.1000       5.8       298       187        95
VIS    2025250     91400   22.2300 -109.1400       7.4       298       181        98
VIS    2025250     91400   22.2000 -109.1900       6.7       308       168        92
VIS    2025250     91400   22.2100 -109.2000       6.7       310       171        99
VIS    2025250     91400   22.2200 -109.2500       4.5       305       168        97
VIS    2025250     91400   22.2200 -109.3200       4.4       289       173        98
VIS    2025250     91400   22.1600 -110.6700       9.3        73       185        91
VIS    2025250     91400   22.1700 -110.7500       4.7        19       170        92
VIS    2025250     91400   22.1500 -110.8400       7.8         4       145        96
VIS    2025250     91400   22.1500 -110.8500       8.0       353       175        98
VIS    2025250     91400   22.1400 -110.8800       9.9       345       161       100
VIS    2025250     91400   22.1400 -110.9200       9.7       343       161        98
VIS    2025250     91400   22.1500 -110.9600       9.1       329       167        96
VIS    2025250     91400   22.1500 -110.9700       9.3       325       172        97
VIS    2025250     91400   22.1600 -111.0000       9.9       323       177        99
VIS    2025250     91400   22.1200 -111.3100       6.2       346       172        96
VIS    2025250     91400   22.1900 -108.9600       6.2       304       187        97
VIS    2025250     91400   22.1900 -108.9900       6.2       306       187        97
VIS    2025250     91400   22.1900 -109.2500       4.1       297       159        98
VIS    2025250     91400   22.1900 -109.3400       5.4       290       159        96
VIS    2025250     91400   22.1300 -110.4500       4.0        34       163        99
VIS    2025250     91400   22.1400 -110.5000       5.2        31       176        96
VIS    2025250     91400   22.1200 -110.8200       8.7       331       187        97
VIS    2025250     91400   22.1200 -110.9100       9.8       349       167        92
VIS    2025250     91400   22.1300 -110.9200      10.0       344       161        99
VIS    2025250     91400   22.1200 -111.3100       6.4       348       172        91
VIS    2025250     91400   22.1800 -108.9500       5.9       308       187        97
VIS    2025250     91400   22.1800 -108.9900       6.3       306       187        98
VIS    2025250     91400   22.1600 -109.0000       7.4       310       183       100
VIS    2025250     91400   22.1800 -109.1300       7.2       279       163        92
VIS    2025250     91400   22.1500 -109.2600       6.5       310       142        93
VIS    2025250     91400   22.1200 -110.5000       5.4        46       166        92
VIS    2025250     91400   22.1100 -110.8400       9.3       324       187        98
VIS    2025250     91400   22.1100 -110.8600       7.8       325       186        93
VIS    2025250     91400   22.0900 -110.9000       6.2       328       185        98
VIS    2025250     91400   22.1000 -110.9300       8.0       352       178        92
VIS    2025250     91400   22.1600 -108.8100       6.8       344       188        99
VIS    2025250     91400   22.1600 -108.8200       6.8       346       187        99
VIS    2025250     91400   22.1500 -109.0000       7.8       312       180        99
VIS    2025250     91400   22.1500 -109.0200       8.0       312       183        99
VIS    2025250     91400   22.1500 -109.0500       9.2       317       179        98
VIS    2025250     91400   22.1400 -109.4600       9.6        94       135        90
VIS    2025250     91400   22.1000 -110.4700       5.6        42       163        97
VIS    2025250     91400   22.1000 -110.4800       5.7        41       163        94
VIS    2025250     91400   22.0800 -110.5700       4.4       353       174        92
VIS    2025250     91400   22.0800 -110.9100       5.9       333       185        99
VIS    2025250     91400   22.0800 -110.9100       6.0       335       185        97
VIS    2025250     91400   22.1300 -108.8400       4.1       345       179        98
VIS    2025250     91400   22.1200 -108.9300       5.3       318       170        98
VIS    2025250     91400   22.0600 -110.5600       5.5         6       175        94
VIS    2025250     91400   22.0400 -110.7500       7.1       315       172        95
VIS    2025250     91400   22.0400 -110.7700       7.3       317       172        91
VIS    2025250     91400   22.0400 -110.8700       7.8       346       183        97
VIS    2025250     91400   22.0400 -110.9300       5.4       330       183        99
VIS    2025250     91400   22.1000 -108.9200       5.2       325       166       100
VIS    2025250     91400   22.1000 -108.9500       6.0       321       170       100
VIS    2025250     91400   22.0800 -109.1300       7.1       303       141        98
VIS    2025250     91400   22.0300 -110.5400       4.1       337       172       100
VIS    2025250     91400   22.0300 -110.5500       4.3       333       173        99
VIS    2025250     91400   22.0200 -110.5900       4.3       342       174        99
VIS    2025250     91400   22.0200 -110.6900       7.1       354       175        99
VIS    2025250     91400   22.0200 -110.7200       7.0       323       170        95
VIS    2025250     91400   22.0400 -110.7400       7.0       315       172        98
VIS    2025250     91400   22.0300 -110.7600       7.5       319       171        97
VIS    2025250     91400   22.0100 -110.9000       4.7       319       175        95
VIS    2025250     91400   22.0100 -110.9200       4.5       323       179        94
VIS    2025250     91400   22.0600 -108.9500       4.6       352       148        91
VIS    2025250     91400   22.0500 -109.0400       8.4        65       138       100
VIS    2025250     91400   22.0600 -109.1000       5.7       306       141        94
VIS    2025250     91400   22.0600 -109.1200       6.8       304       141        99
VIS    2025250     91400   22.0100 -110.5100       4.1       336       172        91
VIS    2025250     91400   22.0200 -110.5800       4.7       331       173       100
VIS    2025250     91400   21.9900 -110.7000       9.0       326       172        96
VIS    2025250     91400   22.0100 -110.7200       8.4       338       170        94
VIS    2025250     91400   22.0100 -110.7300       8.1       337       170        91
VIS    2025250     91400   22.0000 -110.7800       6.7       329       167        95
VIS    2025250     91400   21.9900 -110.8200       5.2       340       167        99
VIS    2025250     91400   21.9900 -110.8400       4.9       340       172        95
VIS    2025250     91400   22.0000 -110.8900       4.3       323       177        94
VIS    2025250     91400   21.9800 -110.7100       8.7       326       172        93
VIS    2025250     91400   21.9700 -110.7700       4.5       341       168        97
VIS    2025250     91400   21.9700 -110.7900       4.3       341       167       100
VIS    2025250     91400   21.9800 -110.8200       4.9       341       167        98
VIS    2025250     91400   21.9600 -110.8500       4.5       331       175        93
VIS    2025250     91400   21.9800 -109.6600      13.9       294       122        93
VIS    2025250     91400   21.9800 -109.7800      17.9       298       124        99
VIS    2025250     91400   21.9500 -110.7800       4.3       344       171        92
VIS    2025250     91400   21.9600 -110.8200       4.7       334       173       100
VIS    2025250     91400   21.9500 -110.8500       5.1       320       176        96
VIS    2025250     91400   21.9500 -110.8700       5.0       322       177        99
VIS    2025250     91400   21.9700 -109.6700      13.8       294       122        95
VIS    2025250     91400   21.9600 -109.7900      16.5       300       124       100
VIS    2025250     91400   21.9200 -110.8200       5.8       332       174        99
VIS    2025250     91400   21.9200 -110.8200       5.9       329       174        99
VIS    2025250     91400   21.9200 -110.8800       6.0       318       177        97
VIS    2025250     91400   21.9300 -110.8900       6.2       321       186        97
VIS    2025250     91400   21.8900 -110.5900       5.6       316       174        98
VIS    2025250     91400   21.9000 -110.6100       4.9       322       174        97
VIS    2025250     91400   21.8900 -110.6700       5.2       318       171       100
VIS    2025250     91400   21.8800 -110.8300       4.8       350       174       100
VIS    2025250     91400   21.8800 -110.8500       5.0       343       174       100
VIS    2025250     91400   21.9000 -110.8800       6.2       326       182        91
VIS    2025250     91400   21.8800 -110.5100       5.8       315       166        96
VIS    2025250     91400   21.8900 -110.6000       5.4       315       174        98
VIS    2025250     91400   21.8600 -110.6400       4.6       317       175        99
VIS    2025250     91400   21.8800 -110.6800       4.1       313       174        97
VIS    2025250     91400   21.8800 -110.8500       5.0       344       174       100
VIS    2025250     91400   21.9400 -108.3000       7.1        70       148        91
VIS    2025250     91400   21.9500 -108.3200       7.3        70       148        97
VIS    2025250     91400   21.9200 -108.3700       7.1        74       125        99
VIS    2025250     91400   21.9200 -108.3800       7.1        75       125        97
VIS    2025250     91400   21.9200 -108.5300      10.8         8       112        95
VIS    2025250     91400   21.8600 -110.5000       5.6       298       167        99
VIS    2025250     91400   21.8600 -110.5300       5.3       310       168        98
VIS    2025250     91400   21.8400 -110.5600       5.2       294       175        96
VIS    2025250     91400   21.8600 -110.5900       4.4       310       175        95
VIS    2025250     91400   21.9200 -108.2800       6.5        82       156        97
VIS    2025250     91400   21.9200 -108.3100       6.7        70       148        98
VIS    2025250     91400   21.9200 -108.3600       7.1        70       129       100
VIS    2025250     91400   21.9200 -108.3700       7.2        73       125        99
VIS    2025250     91400   21.9100 -108.5400      10.9         7       111        97
VIS    2025250     91400   21.8300 -110.4900       5.4       277       169        92
VIS    2025250     91400   21.8300 -110.5100       5.1       272       170        93
VIS    2025250     91400   21.8300 -110.5600       5.1       290       175        99
VIS    2025250     91400   21.8300 -110.5800       4.7       300       175        99
VIS    2025250     91400   21.8900 -108.3700       6.3        61       129        93
VIS    2025250     91400   21.8000 -110.5600       5.1       280       176        99
VIS    2025250     91400   21.7900 -110.6000       5.6       285       179        99
VIS    2025250     91400   21.8000 -110.6000       5.8       286       176        99
VIS    2025250     91400   21.8500 -108.5300       7.4       166       104        99
VIS    2025250     91400   21.7800 -110.5900       5.3       288       176       100
VIS    2025250     91400   21.7800 -110.6000       5.5       288       179       100
VIS    2025250     91400   21.8200 -108.5500       7.4       167       104        95
VIS    2025250     91400   21.7800 -109.5200      11.5       113       114        91
VIS    2025250     91400   21.8100 -108.3400       9.7        84       120        94
VIS    2025250     91400   21.7700 -109.5100      11.3       111       115        93
VIS    2025250     91400   21.7500 -109.5400      11.3       115       114        98
VIS    2025250     91400   21.7500 -109.5700      11.0       114       114        99
VIS    2025250     91400   21.7400 -109.6900       7.2       128       116        96
VIS    2025250     91400   21.7400 -109.9000       5.7       139       124        97
VIS    2025250     91400   21.7300 -110.5100       4.7        58       179        94
VIS    2025250     91400   21.7800 -108.1500       7.7        72       170        99
VIS    2025250     91400   21.7800 -108.2200       8.1        84       150        98
VIS    2025250     91400   21.7900 -108.2400       9.6        76       150        99
VIS    2025250     91400   21.7700 -108.4600      29.3       116       109        97
VIS    2025250     91400   21.7400 -109.5300      11.4       115       114        97
VIS    2025250     91400   21.7400 -109.5400      11.1       115       114        99
VIS    2025250     91400   21.7200 -109.8900       5.5       139       124        98
VIS    2025250     91400   21.7300 -109.8900       5.8       137       124        95
VIS    2025250     91400   21.6900 -110.5300       4.7        56       180        99
VIS    2025250     91400   21.6900 -110.5400       4.5        60       180        99
VIS    2025250     91400   21.7700 -108.1500       7.8        71       164        99
VIS    2025250     91400   21.7600 -108.1700       7.9        73       161        98
VIS    2025250     91400   21.7000 -109.4000      15.2       108       116       100
VIS    2025250     91400   21.7000 -109.4100      15.1       108       116       100
VIS    2025250     91400   21.7200 -109.4300      14.8       107       116       100
VIS    2025250     91400   21.7100 -109.8900       5.5       140       124       100
VIS    2025250     91400   21.6800 -110.3600       4.3        32       160        91
VIS    2025250     91400   21.7400 -108.1300       7.5        76       166        99
VIS    2025250     91400   21.7500 -108.1400       8.0        73       166       100
VIS    2025250     91400   21.7200 -108.2900      10.9        91       135        94
VIS    2025250     91400   21.6900 -109.4000      15.2       108       116       100
VIS    2025250     91400   21.7000 -109.4100      15.1       108       116       100
VIS    2025250     91400   21.7000 -109.4500      15.0       108       116       100
VIS    2025250     91400   21.7000 -109.4700      14.7       109       116       100
VIS    2025250     91400   21.6600 -109.9300       5.2       112       131        93
VIS    2025250     91400   21.6600 -110.3800       4.3        29       161        98
VIS    2025250     91400   21.7200 -108.1300       7.4        89       166        98
VIS    2025250     91400   21.7000 -108.3200      10.1        92       134        97
VIS    2025250     91400   21.7000 -108.3400       7.6        84       129        94
VIS    2025250     91400   21.6900 -108.3800       6.0        78       119        99
VIS    2025250     91400   21.6800 -109.1300      20.6         1       116        90
VIS    2025250     91400   21.6600 -109.7400       6.2        92       115        97
VIS    2025250     91400   21.6500 -109.9300       5.3       112       131        96
VIS    2025250     91400   21.6700 -108.1200       8.1        93       169        97
VIS    2025250     91400   21.6800 -108.1400       8.7        98       156        99
VIS    2025250     91400   21.6800 -108.3400       6.9        79       132       100
VIS    2025250     91400   21.6400 -109.4000      13.1        80       112        97
VIS    2025250     91400   21.6700 -108.1200       7.9        92       169        95
VIS    2025250     91400   21.6100 -109.4100      12.7        76       112        99
VIS    2025250     91400   21.5800 -110.0500       4.8       157       152        99
VIS    2025250     91400   21.5700 -110.3800       4.7       312       161        93
VIS    2025250     91400   21.6400 -108.0900       6.3        75       185        98
VIS    2025250     91400   21.6200 -108.1400       4.4        75       176        95
VIS    2025250     91400   21.6300 -108.4200       9.5        83       122        96
VIS    2025250     91400   21.5700 -109.6100       8.0       120       123        98
VIS    2025250     91400   21.5600 -109.6600       5.9       118       116        98
VIS    2025250     91400   21.5700 -109.7800       4.9        70       128        95
VIS    2025250     91400   21.5700 -109.8000       4.7        69       128        92
VIS    2025250     91400   21.5800 -109.8200       4.9        71       128        90
VIS    2025250     91400   21.2900 -118.0400       6.0       149       181        95
VIS    2025250     91400   21.2900 -118.0700       5.1       161       181        94
VIS    2025250     91400   21.3000 -118.0700       5.6       160       182        96
VIS    2025250     91400   21.6000 -108.1300       5.6        81       176       100
VIS    2025250     91400   21.5900 -108.5800       7.4       310       111        94
VIS    2025250     91400   21.5900 -108.5800       7.5       310       111        90
VIS    2025250     91400   21.5400 -109.5800       8.4       118       121       100
VIS    2025250     91400   21.5500 -109.6100       7.9       122       121       100
VIS    2025250     91400   21.5500 -109.6200       7.2       122       120        95
VIS    2025250     91400   21.5600 -109.6700       5.7       119       120        98
VIS    2025250     91400   21.5400 -109.7200       4.7       121       123        99
VIS    2025250     91400   21.5300 -109.7400       4.7       118       123        99
VIS    2025250     91400   21.5300 -109.7700       4.8       110       124        96
VIS    2025250     91400   21.5400 -110.1200       7.7       270       156        97
VIS    2025250     91400   21.5300 -110.3900       5.3       276       162        98
VIS    2025250     91400   21.5300 -110.4200       4.3       274       164        95
VIS    2025250     91400   21.2600 -118.0400       5.5       148       184        98
VIS    2025250     91400   21.2800 -118.0400       5.8       151       181        97
VIS    2025250     91400   21.2800 -118.0700       5.2       161       181        91
VIS    2025250     91400   21.2600 -118.1000       5.3       160       184       100
VIS    2025250     91400   21.5800 -108.1400       6.3        77       176        95
VIS    2025250     91400   21.5400 -108.9000      17.2        98       113        92
VIS    2025250     91400   21.5200 -109.4400      12.5        84       114        99
VIS    2025250     91400   21.5200 -109.4500      12.3        86       114        98
VIS    2025250     91400   21.5100 -109.6800       4.6       121       123        97
VIS    2025250     91400   21.5100 -109.7200       4.6       123       123       100
VIS    2025250     91400   21.5100 -109.7400       4.8       126       123        99
VIS    2025250     91400   21.5200 -109.7600       4.7       111       124        99
VIS    2025250     91400   21.2400 -118.0500       5.0       144       186        97
VIS    2025250     91400   21.2400 -118.0700       4.9       152       184        95
VIS    2025250     91400   21.2400 -118.1200       4.5       156       183        95
VIS    2025250     91400   21.2400 -118.1300       4.4       156       183        93
VIS    2025250     91400   21.5500 -108.1200       8.3        61       187        99
VIS    2025250     91400   21.5400 -108.1700       9.8        65       171        97
VIS    2025250     91400   21.5300 -108.9000      17.4        99       113        93
VIS    2025250     91400   21.5000 -109.4200      13.5        85       110        99
VIS    2025250     91400   21.5000 -109.4500      12.7        83       107       100
VIS    2025250     91400   21.4900 -109.4900      12.3        86       115        96
VIS    2025250     91400   21.4900 -109.6500       4.1       114       122        99
VIS    2025250     91400   21.5100 -109.6600       4.5       107       123       100
VIS    2025250     91400   21.5000 -109.7000       4.3       124       122        99
VIS    2025250     91400   21.5000 -109.7400       4.7       126       123        99
VIS    2025250     91400   21.5000 -109.7600       4.5       115       124       100
VIS    2025250     91400   21.4900 -109.7900       5.2       110       128        92
VIS    2025250     91400   21.2300 -118.0600       4.6       145       187        96
VIS    2025250     91400   21.2100 -118.0900       4.7       146       187       100
VIS    2025250     91400   21.2200 -118.0900       4.4       152       185       100
VIS    2025250     91400   21.2300 -118.1300       4.1       156       183        92
VIS    2025250     91400   21.2100 -118.1600       4.0       152       184        99
VIS    2025250     91400   21.5300 -108.1400       9.2        60       187        98
VIS    2025250     91400   21.5400 -108.1900       9.8        64       166        90
VIS    2025250     91400   21.5200 -108.2300       7.9         6       171        91
VIS    2025250     91400   21.5200 -108.2600       9.0       348       174        90
VIS    2025250     91400   21.4900 -109.4100      13.8        87       110        93
VIS    2025250     91400   21.4800 -109.4600      12.8        83       107        99
VIS    2025250     91400   21.4900 -109.4600      12.7        83       107        99
VIS    2025250     91400   21.4600 -109.5400       8.4        82       113        99
VIS    2025250     91400   21.4700 -109.5600       8.3        86       113        94
VIS    2025250     91400   21.4700 -109.7800       4.4       113       127        95
VIS    2025250     91400   21.4500 -110.0400       4.0       217       148        96
VIS    2025250     91400   21.1900 -118.1200       6.1       163       186        99
VIS    2025250     91400   21.2000 -118.1600       4.2       153       184       100
VIS    2025250     91400   21.5100 -108.1800       9.1        49       183        98
VIS    2025250     91400   21.5100 -108.1800       8.9        46       174        98
VIS    2025250     91400   21.4900 -108.2900       8.2         1       179        99
VIS    2025250     91400   21.4800 -108.4100       5.3        17       162        95
VIS    2025250     91400   21.4800 -108.4300       6.2        17       158        98
VIS    2025250     91400   21.4900 -108.4500       6.3        19       156        97
VIS    2025250     91400   21.4800 -108.5200      11.4         8       138        97
VIS    2025250     91400   21.4600 -109.4100      14.2        91       110        94
VIS    2025250     91400   21.4500 -109.5400       8.6        79       113        99
VIS    2025250     91400   21.4400 -109.5500       8.5        78       113        99
VIS    2025250     91400   21.4400 -109.5800       8.4        76       113        99
VIS    2025250     91400   21.4300 -109.6900       4.8        83       117        99
VIS    2025250     91400   21.4400 -109.7100       4.2        85       119       100
VIS    2025250     91400   21.4300 -109.7400       4.6        82       119        98
VIS    2025250     91400   21.4400 -109.9200       5.3       200       131        95
VIS    2025250     91400   21.2500 -114.9800      13.8       150       185        98
VIS    2025250     91400   21.1600 -118.1200       7.6       159       185        94
VIS    2025250     91400   21.1600 -118.1600       5.9       165       183        98
VIS    2025250     91400   21.1600 -118.1600       5.4       165       183        98
VIS    2025250     91400   21.4700 -108.2800       7.1        18       183        90
VIS    2025250     91400   21.4800 -108.3100       7.4         3       178        99
VIS    2025250     91400   21.4800 -108.3500       4.8         7       175        95
VIS    2025250     91400   21.4600 -108.3800       4.1        11       172        96
VIS    2025250     91400   21.4700 -108.4100       5.1        20       162        98
VIS    2025250     91400   21.4700 -108.4400       5.9        19       158       100
VIS    2025250     91400   21.4600 -108.4800       9.2         9       153        95
VIS    2025250     91400   21.4700 -108.5200      11.2         8       138        93
VIS    2025250     91400   21.4600 -108.5300      11.6         6       138        95
VIS    2025250     91400   21.4200 -109.5700       8.5        75       113       100
VIS    2025250     91400   21.4100 -109.6000       8.1        79       113        99
VIS    2025250     91400   21.4200 -109.6800       5.9        84       116        99
VIS    2025250     91400   21.4200 -109.7000       5.5        82       117        99
VIS    2025250     91400   21.4300 -109.7300       4.6        81       119        99
VIS    2025250     91400   21.4100 -109.9400       4.8       203       131       100
VIS    2025250     91400   21.4100 -109.9500       5.1       202       131        98
VIS    2025250     91400   21.2500 -114.9800      13.8       150       181        98
VIS    2025250     91400   21.2400 -115.0600      11.2       155       183        95
VIS    2025250     91400   21.1300 -118.0800       6.8       160       186        98
VIS    2025250     91400   21.1300 -118.1100       6.6       156       185       100
VIS    2025250     91400   21.4400 -108.3400       4.0        15       181        97
VIS    2025250     91400   21.4400 -108.3500       4.2        13       181       100
VIS    2025250     91400   21.4500 -108.3800       4.2        10       172        97
VIS    2025250     91400   21.4400 -108.4400       4.9        22       158        98
VIS    2025250     91400   21.4400 -108.4400       5.3        17       158        97
VIS    2025250     91400   21.4500 -108.5500      10.6         9       144        99
VIS    2025250     91400   21.4000 -109.5700       8.5        75       113        97
VIS    2025250     91400   21.4000 -109.5900       8.1        80       110       100
VIS    2025250     91400   21.3900 -109.6300       7.6        85       110        98
VIS    2025250     91400   21.4000 -109.6400       7.5        87       113        96
VIS    2025250     91400   21.4000 -109.6700       7.1        85       116       100
VIS    2025250     91400   21.3800 -109.7400       7.4        87       113        91
VIS    2025250     91400   21.3800 -110.4200       5.1        16       176        98
VIS    2025250     91400   21.2000 -114.9400      14.5       133       180        96
VIS    2025250     91400   21.2200 -114.9900      13.9       136       178        93
VIS    2025250     91400   21.2200 -115.0300       9.2       143       172        93
VIS    2025250     91400   21.2100 -115.0700       9.5       148       175        99
VIS    2025250     91400   21.1100 -118.0900       6.1       158       186       100
VIS    2025250     91400   21.1100 -118.1000       5.9       157       186       100
VIS    2025250     91400   21.1200 -118.1300       5.2       150       184        90
VIS    2025250     91400   21.4300 -108.3500       4.5        22       181        98
VIS    2025250     91400   21.4200 -108.3600       4.7        23       181        99
VIS    2025250     91400   21.3700 -109.6100       8.0        77       105       100
VIS    2025250     91400   21.3700 -109.6300       7.6        82       107        99
VIS    2025250     91400   21.3600 -109.6800       7.5        86       112        98
VIS    2025250     91400   21.3700 -109.6800       7.7        85       113       100
VIS    2025250     91400   21.3400 -110.0800       5.8       210       133        92
VIS    2025250     91400   21.1800 -114.9300      13.8       135       175       100
VIS    2025250     91400   21.1900 -114.9500      14.4       136       175        97
VIS    2025250     91400   21.1900 -115.0300       9.8       145       169        96
VIS    2025250     91400   21.1800 -115.0500       9.4       150       169       100
VIS    2025250     91400   21.1900 -115.0800      10.1       150       175        99
VIS    2025250     91400   21.0900 -118.0900       5.3       154       186       100
VIS    2025250     91400   21.1000 -118.1000       5.7       156       186       100
VIS    2025250     91400   21.0800 -118.1300       4.8       167       186       100
VIS    2025250     91400   21.0900 -118.1800       4.6       215       181        93
VIS    2025250     91400   21.0800 -118.2000       4.2       213       183       100
VIS    2025250     91400   21.4000 -108.3800       5.0        34       170        97
VIS    2025250     91400   21.3800 -108.4100       5.5        20       168        90
VIS    2025250     91400   21.3400 -109.4300       7.9       163       104       100
VIS    2025250     91400   21.3400 -109.4400       7.9       163       104       100
VIS    2025250     91400   21.3300 -109.6100       8.3        80       105        99
VIS    2025250     91400   21.3500 -109.6400       8.0        78       105        93
VIS    2025250     91400   21.3500 -109.6700       7.2        87       110        93
VIS    2025250     91400   21.3200 -110.0800       4.9       199       119        96
VIS    2025250     91400   21.1600 -114.9100      14.3       135       169        99
VIS    2025250     91400   21.1700 -114.9200      13.7       135       170       100
VIS    2025250     91400   21.1700 -114.9700      10.5       142       164        93
VIS    2025250     91400   21.1700 -114.9900      11.5       148       167        96
VIS    2025250     91400   21.1500 -115.0200       9.2       151       167        96
VIS    2025250     91400   21.1600 -115.0500       9.4       152       167        99
VIS    2025250     91400   21.1400 -115.0900       9.5       151       172        99
VIS    2025250     91400   21.1400 -115.1100       9.6       151       176        98
VIS    2025250     91400   21.0600 -117.8700       8.4       143       158        90
VIS    2025250     91400   21.0600 -118.0400       6.0       159       183        92
VIS    2025250     91400   21.0800 -118.0800       5.1       151       184       100
VIS    2025250     91400   21.0800 -118.1100       4.9       160       185       100
VIS    2025250     91400   21.0700 -118.1200       4.7       165       186       100
VIS    2025250     91400   21.0700 -118.2100       4.1       201       183        99
VIS    2025250     91400   21.3400 -108.8500      16.6        63       134       100
VIS    2025250     91400   21.3400 -108.8600      16.4        63       134       100
VIS    2025250     91400   21.3300 -108.8900      10.8        77       119        94
VIS    2025250     91400   21.3200 -109.5600       8.5        74       105        99
VIS    2025250     91400   21.3200 -109.5800       8.7        77       105        97
VIS    2025250     91400   21.3200 -109.6300       8.4        85       104        97
VIS    2025250     91400   21.3200 -109.6400       8.4        88       103        95
VIS    2025250     91400   21.2800 -110.3600       7.7       238       164        93
VIS    2025250     91400   21.1200 -114.9100      13.8       134       171       100
VIS    2025250     91400   21.1200 -114.9600       9.7       138       162        99
VIS    2025250     91400   21.1300 -114.9700       9.3       138       162       100
VIS    2025250     91400   21.1200 -115.0100       7.2       143       167       100
VIS    2025250     91400   21.1300 -115.0200       7.7       146       167       100
VIS    2025250     91400   21.1400 -115.0900       9.4       151       172        99
VIS    2025250     91400   21.1300 -115.1100       8.8       151       185        99
VIS    2025250     91400   21.1000 -115.8400      12.6       165       185       100
VIS    2025250     91400   21.0900 -115.8700      13.8       166       183        99
VIS    2025250     91400   21.1000 -115.8900      13.4       165       184        99
VIS    2025250     91400   21.0400 -117.8600       8.5       142       161        98
VIS    2025250     91400   21.0400 -117.8900       7.1       146       158        92
VIS    2025250     91400   21.0600 -117.9200       4.6       160       162        96
VIS    2025250     91400   21.0300 -117.9500       5.1       149       158        91
VIS    2025250     91400   21.0300 -117.9600       5.3       148       158        94
VIS    2025250     91400   21.0400 -118.0000       7.4       153       173       100
VIS    2025250     91400   21.0300 -118.0100       7.3       154       172        98
VIS    2025250     91400   21.0500 -118.0500       6.1       155       183        92
VIS    2025250     91400   21.0400 -118.0700       6.2       156       180        91
VIS    2025250     91400   21.0500 -118.1100       4.8       163       183        99
VIS    2025250     91400   21.0300 -118.1500       4.7       173       185        96
VIS    2025250     91400   21.3200 -108.8300      16.7        64       134       100
VIS    2025250     91400   21.3200 -108.9100      11.5        80       117        93
VIS    2025250     91400   21.3200 -108.9300      12.3        83       117       100
VIS    2025250     91400   21.2900 -109.6100       8.4        86       103        91
VIS    2025250     91400   21.2900 -109.6100       8.4        86       103        93
VIS    2025250     91400   21.2600 -110.0800       4.3       157       114        90
VIS    2025250     91400   21.2700 -110.4300       4.6       200       174        99
VIS    2025250     91400   21.1200 -114.9100      13.9       134       173        99
VIS    2025250     91400   21.1200 -114.9600       9.9       139       162       100
VIS    2025250     91400   21.1200 -114.9700       8.3       136       162        99
VIS    2025250     91400   21.1000 -115.0000       8.5       137       177       100
VIS    2025250     91400   21.1000 -115.0300       9.0       142       177       100
VIS    2025250     91400   21.0700 -115.8200      12.1       151       184        96
VIS    2025250     91400   21.0800 -115.8200      11.9       152       184        96
VIS    2025250     91400   21.0900 -115.8700      13.8       165       183        99
VIS    2025250     91400   21.0800 -115.8800      13.6       164       183        98
VIS    2025250     91400   21.0800 -115.9100      13.2       166       185        99
VIS    2025250     91400   21.0300 -117.8500       8.4       143       162        99
VIS    2025250     91400   21.0300 -117.8800       8.2       143       158        95
VIS    2025250     91400   21.0100 -117.9300       6.3       141       152        95
VIS    2025250     91400   21.0200 -117.9300       5.7       145       154        92
VIS    2025250     91400   21.0300 -117.9600       5.5       147       157        92
VIS    2025250     91400   21.0100 -118.0000       7.1       151       162        99
VIS    2025250     91400   21.0100 -118.0200       7.1       154       162        96
VIS    2025250     91400   21.0200 -118.0900       5.9       165       179        97
VIS    2025250     91400   21.0000 -118.1100       4.9       171       178       100
VIS    2025250     91400   21.0000 -118.1200       4.6       169       179       100
VIS    2025250     91400   21.0100 -118.1600       4.6       169       182        98
VIS    2025250     91400   21.3000 -108.9300      12.4        93       117        93
VIS    2025250     91400   21.2800 -108.9500      14.1        97       113        98
VIS    2025250     91400   21.2600 -109.6900      11.1        80       107        91
VIS    2025250     91400   21.2500 -109.7200      11.3        74       107        97
VIS    2025250     91400   21.2600 -109.7600      10.5        74       107        94
VIS    2025250     91400   21.2600 -109.7600      10.4        73       107        92
VIS    2025250     91400   21.0900 -114.9200      12.5       130       180       100
VIS    2025250     91400   21.0800 -114.9500      12.0       134       177        97
VIS    2025250     91400   21.0800 -114.9600      11.8       134       176        98
VIS    2025250     91400   21.0900 -114.9900       8.9       136       177       100
VIS    2025250     91400   21.0900 -115.0300       9.3       142       177       100
VIS    2025250     91400   21.0700 -115.8200      12.3       149       185        97
VIS    2025250     91400   21.0700 -115.8400      13.0       159       183        99
VIS    2025250     91400   21.0600 -115.8900      13.0       164       184        99
VIS    2025250     91400   21.0000 -117.4500       7.7       174       178        99
VIS    2025250     91400   21.0200 -117.4700       7.0       181       178        99
VIS    2025250     91400   20.9900 -117.9100       7.8       147       153        97
VIS    2025250     91400   21.0000 -117.9300       6.7       141       151        96
VIS    2025250     91400   20.9800 -118.0400       6.2       152       155        93
VIS    2025250     91400   20.9800 -118.0800       5.4       172       173       100
VIS    2025250     91400   20.9900 -118.0900       5.0       174       177        99
VIS    2025250     91400   21.0000 -118.1100       4.7       171       178       100
VIS    2025250     91400   21.0000 -118.1500       4.4       165       181        98
VIS    2025250     91400   20.9900 -118.1800       4.6       166       182        97
VIS    2025250     91400   20.9900 -118.2000       4.5       171       183        91
VIS    2025250     91400   21.2700 -108.7900       7.9        43       151       100
VIS    2025250     91400   21.2600 -108.9400      13.8       102       113        99
VIS    2025250     91400   21.2700 -108.9400      13.9       100       113       100
VIS    2025250     91400   21.2500 -109.0900      13.8        55       105        99
VIS    2025250     91400   21.2500 -109.1000      13.8        56       105        99
VIS    2025250     91400   21.2400 -109.7200      11.3        75       107        98
VIS    2025250     91400   21.2400 -109.7300      11.3        75       107        98
VIS    2025250     91400   21.2100 -110.5600       4.4       294       173        96
VIS    2025250     91400   21.0700 -114.9300      12.6       131       178        97
VIS    2025250     91400   21.0500 -114.9800      10.7       138       176       100
VIS    2025250     91400   21.0700 -114.9900      10.6       140       176       100
VIS    2025250     91400   21.0600 -115.0300      11.8       146       184        98
VIS    2025250     91400   21.0600 -115.0400      11.5       147       184        98
VIS    2025250     91400   21.0400 -115.8100      12.7       154       184       100
VIS    2025250     91400   21.0200 -115.8500      12.6       156       184       100
VIS    2025250     91400   21.0400 -115.8700      12.8       158       184       100
VIS    2025250     91400   20.9600 -117.8500       8.4       148       178        99
VIS    2025250     91400   20.9800 -117.8900       9.4       154       163        96
VIS    2025250     91400   20.9700 -117.8900       9.2       153       163        99
VIS    2025250     91400   20.9600 -117.9400       7.3       136       151        97
VIS    2025250     91400   20.9600 -118.0000       7.3       148       145        97
VIS    2025250     91400   20.9600 -118.0100       6.5       151       145        98
VIS    2025250     91400   20.9800 -118.0400       6.1       150       155        93
VIS    2025250     91400   20.9700 -118.0800       4.7       169       172       100
VIS    2025250     91400   20.9700 -118.1000       4.3       170       174        98
VIS    2025250     91400   20.9700 -118.1400       4.4       166       180        98
VIS    2025250     91400   20.9500 -118.1700       4.7       162       181       100
VIS    2025250     91400   20.9500 -118.1900       4.3       165       182        99
VIS    2025250     91400   20.9600 -118.2000       4.3       168       182       100
VIS    2025250     91400   21.2500 -108.9300      14.2       103       113        98
VIS    2025250     91400   21.2400 -108.9600      15.4       101       109       100
VIS    2025250     91400   21.2400 -109.1000      13.8        54       105        99
VIS    2025250     91400   21.2200 -109.7200      11.3        74       107        98
VIS    2025250     91400   21.2200 -109.7300      11.3        74       107        98
VIS    2025250     91400   21.0400 -114.9200      13.6       131       183        93
VIS    2025250     91400   21.0400 -114.9300      13.1       133       181        96
VIS    2025250     91400   21.0200 -114.9700      10.7       130       177       100
VIS    2025250     91400   21.0400 -114.9900      10.7       137       177       100
VIS    2025250     91400   21.0100 -115.8400      12.4       155       184       100
VIS    2025250     91400   21.0100 -115.8500      12.5       156       185       100
VIS    2025250     91400   20.9300 -117.8700       5.9       153       179        96
VIS    2025250     91400   20.9500 -117.8800       7.4       154       163       100
VIS    2025250     91400   20.9300 -117.9200       5.3       142       165       100
VIS    2025250     91400   20.9400 -118.0100       6.3       153       150        96
VIS    2025250     91400   20.9300 -118.0500       4.8       137       151        93
VIS    2025250     91400   20.9300 -118.1800       4.3       161       180       100
VIS    2025250     91400   21.0000 -114.8800      13.4       139       183        97
VIS    2025250     91400   21.0100 -114.9200      13.2       131       183        96
VIS    2025250     91400   21.0000 -114.9500      11.5       121       179       100
VIS    2025250     91400   21.0200 -114.9900      10.6       133       177       100
VIS    2025250     91400   20.9100 -117.8800       5.5       154       181        93
VIS    2025250     91400   20.9200 -117.9200       4.9       141       169       100
VIS    2025250     91400   20.9200 -117.9300       5.2       127       165        99
VIS    2025250     91400   20.9300 -118.0000       5.6       151       152        95
VIS    2025250     91400   20.9000 -118.0400       4.2       132       156        91
VIS    2025250     91400   20.9000 -118.1700       4.0       163       171       100
VIS    2025250     91400   20.9100 -118.2000       4.0       170       176       100
VIS    2025250     91400   21.1900 -108.9500      18.2        71       121        98
VIS    2025250     91400   21.1500 -109.9900       4.0        51       103        96
VIS    2025250     91400   21.1400 -110.1300       4.7        48       109       100
VIS    2025250     91400   20.9700 -114.8100      11.7       139       181       100
VIS    2025250     91400   20.9800 -114.8600      12.6       137       183       100
VIS    2025250     91400   20.9700 -114.9100      11.3       133       183       100
VIS    2025250     91400   20.9700 -114.9200      11.3       132       183       100
VIS    2025250     91400   20.9800 -114.9600      11.6       125       178        99
VIS    2025250     91400   20.9400 -116.0300      10.6       156       185        99
VIS    2025250     91400   20.9400 -116.0700      12.4       149       183        98
VIS    2025250     91400   20.9500 -116.1000      12.6       150       185        99
VIS    2025250     91400   20.9400 -116.1200      12.6       151       184        98
VIS    2025250     91400   20.9000 -117.9300       5.1       118       171       100
VIS    2025250     91400   20.8900 -117.9800       5.2       121       177       100
VIS    2025250     91400   20.9000 -118.0000       4.5       126       158        99
VIS    2025250     91400   20.8800 -118.0300       4.4       126       156        98
VIS    2025250     91400   21.1400 -109.1300      28.0       108       109        94
VIS    2025250     91400   21.1100 -109.9900       4.2        59       103        92
VIS    2025250     91400   21.1200 -110.0000       4.1        58       103        93
VIS    2025250     91400   21.1300 -110.1500       4.2        41       110        90
VIS    2025250     91400   20.9500 -114.7900      11.4       137       184        91
VIS    2025250     91400   20.9500 -114.8100      11.0       132       177        99
VIS    2025250     91400   20.9500 -114.8500      11.5       131       177        96
VIS    2025250     91400   20.9500 -114.8600      11.4       131       179        93
VIS    2025250     91400   20.9700 -114.9000      11.2       132       184       100
VIS    2025250     91400   20.9500 -114.9400      12.0       132       182        99
VIS    2025250     91400   20.9400 -114.9600      11.7       132       180       100
VIS    2025250     91400   20.9400 -114.9800      11.2       137       180       100
VIS    2025250     91400   20.9300 -116.0200      10.5       159       185        99
VIS    2025250     91400   20.9100 -116.0300      12.1       167       170       100
VIS    2025250     91400   20.9300 -116.0800      12.4       149       181        99
VIS    2025250     91400   20.9300 -116.1000      12.0       150       181       100
VIS    2025250     91400   20.9300 -116.1100      12.0       151       181        99
VIS    2025250     91400   20.9200 -116.1600      12.9       153       181        95
VIS    2025250     91400   20.8800 -117.9800       5.6       121       178       100
VIS    2025250     91400   20.8600 -118.0100       5.4       118       162        99
VIS    2025250     91400   20.8500 -118.0400       4.1       126       158        95
VIS    2025250     91400   20.8700 -118.0400       4.2       131       158        98
VIS    2025250     91400   21.1000 -109.9800       5.3        48       103        95
VIS    2025250     91400   21.1100 -110.0100       4.5        50       103        99
VIS    2025250     91400   21.0900 -110.0400       5.5        31       103        99
VIS    2025250     91400   20.9300 -114.8000      10.3       126       180        97
VIS    2025250     91400   20.9400 -114.8100      10.9       131       177        99
VIS    2025250     91400   20.9400 -114.8600      11.1       130       178        96
VIS    2025250     91400   20.9400 -114.9100      11.5       132       184       100
VIS    2025250     91400   20.9400 -114.9500      12.2       134       182        99
VIS    2025250     91400   20.9400 -114.9500      11.9       132       182       100
VIS    2025250     91400   20.8900 -115.9800      11.8       165       163        98
VIS    2025250     91400   20.8900 -116.0000      11.9       169       163       100
VIS    2025250     91400   20.8900 -116.0300      11.9       172       166       100
VIS    2025250     91400   20.8900 -116.0400      11.8       173       162       100
VIS    2025250     91400   20.8800 -116.0800      11.8       172       165       100
VIS    2025250     91400   20.9000 -116.1100      11.2       158       177        99
VIS    2025250     91400   20.9000 -116.1200      11.4       158       177       100
VIS    2025250     91400   20.9000 -116.1700      12.4       157       177        98
VIS    2025250     91400   20.8900 -116.1900      11.8       161       177        98
VIS    2025250     91400   20.8900 -116.2200      11.6       149       183        98
VIS    2025250     91400   20.8700 -116.6500       9.9       155       186        99
VIS    2025250     91400   20.8500 -117.9700       6.3       129       184       100
VIS    2025250     91400   20.8500 -118.0200       5.8       118       162       100
VIS    2025250     91400   20.8500 -118.0400       4.0       125       161        96
VIS    2025250     91400   21.0800 -110.0000       5.7        38       103        92
VIS    2025250     91400   21.0800 -110.0400       5.6        28       103        98
VIS    2025250     91400   21.0700 -110.2200       5.3       344       138        92
VIS    2025250     91400   21.0500 -110.2600       6.1       346       152        94
VIS    2025250     91400   21.0500 -110.2700       6.0       345       152        94
VIS    2025250     91400   21.0600 -110.3100       5.2       340       156        92
VIS    2025250     91400   20.9100 -114.8600      10.1       127       173        94
VIS    2025250     91400   20.9000 -114.8900      11.3       133       173        99
VIS    2025250     91400   20.9000 -114.9000      11.7       136       179        99
VIS    2025250     91400   20.9000 -114.9500      12.5       137       184        99
VIS    2025250     91400   20.8700 -115.8100      11.4       151       185       100
VIS    2025250     91400   20.8700 -115.8200      11.4       151       185       100
VIS    2025250     91400   20.8700 -115.8500      11.1       154       185       100
VIS    2025250     91400   20.8700 -115.8700      11.2       160       185       100
VIS    2025250     91400   20.8600 -115.9200      12.4       166       181        99
VIS    2025250     91400   20.8600 -115.9400      12.5       166       174        99
VIS    2025250     91400   20.8600 -115.9600      12.1       168       163       100
VIS    2025250     91400   20.8700 -115.9900      11.8       169       158        99
VIS    2025250     91400   20.8700 -116.0400      11.6       174       159       100
VIS    2025250     91400   20.8800 -116.0400      11.6       174       160       100
VIS    2025250     91400   20.8600 -116.0800      12.1       176       161       100
VIS    2025250     91400   20.8700 -116.1000      12.0       175       167        99
VIS    2025250     91400   20.8600 -116.1500      12.6       176       168        98
VIS    2025250     91400   20.8600 -116.1700      12.5       177       169        99
VIS    2025250     91400   20.8600 -116.2000      12.1       174       175       100
VIS    2025250     91400   20.8800 -116.2100      11.4       160       179       100
VIS    2025250     91400   20.8700 -116.2400      11.0       154       182        99
VIS    2025250     91400   20.8100 -118.0100       7.9       128       184        97
VIS    2025250     91400   21.0700 -109.5000       4.6        86       109        92
VIS    2025250     91400   21.0300 -110.1400       6.9       357       115        90
VIS    2025250     91400   21.0500 -110.1700       6.2       358       115        98
VIS    2025250     91400   21.0400 -110.2100       5.4       345       138        90
VIS    2025250     91400   21.0300 -110.2600       5.9       344       147        93
VIS    2025250     91400   21.0400 -110.2700       6.0       345       147        92
VIS    2025250     91400   20.8800 -114.8400      10.5       121       174        98
VIS    2025250     91400   20.8900 -114.8500      10.1       121       173        98
VIS    2025250     91400   20.8900 -114.8900      11.2       133       173        99
VIS    2025250     91400   20.8700 -114.9200      11.0       132       181       100
VIS    2025250     91400   20.8600 -115.8100      11.4       150       183       100
VIS    2025250     91400   20.8500 -115.8300      11.4       151       180       100
VIS    2025250     91400   20.8400 -115.8600      10.8       154       181        99
VIS    2025250     91400   20.8400 -115.8900      11.3       162       181       100
VIS    2025250     91400   20.8500 -115.9200      12.7       166       180       100
VIS    2025250     91400   20.8400 -115.9500      12.6       168       170       100
VIS    2025250     91400   20.8400 -115.9900      11.4       170       156       100
VIS    2025250     91400   20.8500 -116.0100      11.0       172       155       100
VIS    2025250     91400   20.8500 -116.0200      11.0       173       157       100
VIS    2025250     91400   20.8500 -116.0700      12.0       175       160       100
VIS    2025250     91400   20.8500 -116.0900      12.1       176       161       100
VIS    2025250     91400   20.8500 -116.1300      12.4       177       168        98
VIS    2025250     91400   20.8400 -116.1600      12.6       179       173        96
VIS    2025250     91400   20.8500 -116.1600      12.7       179       169        97
VIS    2025250     91400   20.8500 -116.2100      12.0       175       175       100
VIS    2025250     91400   20.8500 -116.2300      10.8       168       179        99
VIS    2025250     91400   20.8400 -116.2700       9.4       166       184        96
VIS    2025250     91400   20.8400 -116.2700       9.4       165       184        97
VIS    2025250     91400   20.8000 -117.1900       8.9       174       186        98
VIS    2025250     91400   20.8000 -117.2200       8.1       172       180        98
VIS    2025250     91400   20.8000 -117.2300       8.0       171       180        99
VIS    2025250     91400   20.8100 -117.2800       7.6       170       182        98
VIS    2025250     91400   21.0300 -109.4200      21.0        19       109        93
VIS    2025250     91400   21.0200 -110.1400       7.0       353       115        93
VIS    2025250     91400   21.0200 -110.2000       7.6       353       124        94
VIS    2025250     91400   21.0100 -110.2200       7.3       353       132        97
VIS    2025250     91400   21.0200 -110.2600       6.0       344       147        97
VIS    2025250     91400   20.8500 -114.8500      11.6       128       180        95
VIS    2025250     91400   20.8500 -114.8600      11.3       126       178        97
VIS    2025250     91400   20.8500 -114.9100      10.3       129       184        99
VIS    2025250     91400   20.8600 -114.9200      10.8       132       185       100
VIS    2025250     91400   20.8400 -115.8100      12.1       151       180       100
VIS    2025250     91400   20.8400 -115.8500      11.3       152       180        99
VIS    2025250     91400   20.8400 -115.8600      10.8       154       181        99
VIS    2025250     91400   20.8300 -115.8900      10.6       159       180       100
VIS    2025250     91400   20.8200 -115.9200      12.1       164       177       100
VIS    2025250     91400   20.8300 -115.9500      12.3       167       168       100
VIS    2025250     91400   20.8200 -115.9800      11.5       169       157       100
VIS    2025250     91400   20.8100 -116.0200      10.6       171       158       100
VIS    2025250     91400   20.8300 -116.0200      10.4       174       158       100
VIS    2025250     91400   20.8300 -116.0700      11.5       176       160       100
VIS    2025250     91400   20.8300 -116.0800      11.6       176       160       100
VIS    2025250     91400   20.8200 -116.1100      12.0       178       167       100
VIS    2025250     91400   20.8300 -116.1600      12.3       180       174        97
VIS    2025250     91400   20.8200 -116.1700      12.0       182       174        98
VIS    2025250     91400   20.8100 -116.2200      11.0       182       179       100
VIS    2025250     91400   20.8200 -116.2300      10.6       177       179        99
VIS    2025250     91400   20.8200 -116.2600       9.9       166       182        99
VIS    2025250     91400   20.8100 -116.2900      10.5       158       186        99
VIS    2025250     91400   20.7800 -117.0800       8.7       166       186        96
VIS    2025250     91400   20.7900 -117.1300       8.9       170       185        99
VIS    2025250     91400   20.8000 -117.1500       9.7       172       186        98
VIS    2025250     91400   20.8000 -117.1900       8.9       173       184        99
VIS    2025250     91400   20.7900 -117.2300       8.0       172       179        98
VIS    2025250     91400   20.7900 -117.2300       8.0       172       179        98
VIS    2025250     91400   20.7800 -117.2700       7.3       174       179       100
VIS    2025250     91400   20.7800 -117.3100       7.0       169       182        99
VIS    2025250     91400   21.0200 -109.1200      15.3        72       107        91
VIS    2025250     91400   21.0200 -109.4100      17.7        17       108        90
VIS    2025250     91400   21.0000 -109.4400      18.0        16       108        90
VIS    2025250     91400   20.9800 -110.0600       9.7        28       112       100
VIS    2025250     91400   20.9900 -110.1600       7.8       353       116        96
VIS    2025250     91400   21.0000 -110.2100       7.9       357       131        99
VIS    2025250     91400   20.9900 -110.2500       7.0       357       140        98
VIS    2025250     91400   21.0000 -110.2500       6.7       355       141        98
VIS    2025250     91400   20.9700 -110.3200       4.4       348       164        93
VIS    2025250     91400   20.8400 -114.8900      10.6       128       184        99
VIS    2025250     91400   20.8000 -115.8000      12.2       151       183       100
VIS    2025250     91400   20.8100 -115.8300      12.4       152       180       100
VIS    2025250     91400   20.7900 -115.8800       9.6       148       176       100
VIS    2025250     91400   20.7900 -115.9100       9.9       155       172       100
VIS    2025250     91400   20.8000 -115.9200      10.2       157       174       100
VIS    2025250     91400   20.8100 -115.9500      11.7       167       165       100
VIS    2025250     91400   20.8100 -115.9800      11.6       169       162       100
VIS    2025250     91400   20.8000 -116.0200      10.7       171       163        99
VIS    2025250     91400   20.8000 -116.0400      10.4       173       163        99
VIS    2025250     91400   20.8000 -116.0700      11.0       174       163       100
VIS    2025250     91400   20.8000 -116.1000      11.2       176       170       100
VIS    2025250     91400   20.7800 -116.1300      10.9       180       177        99
VIS    2025250     91400   20.7800 -116.1600      11.3       187       178        98
VIS    2025250     91400   20.7900 -116.1900      10.8       187       182        99
VIS    2025250     91400   20.7900 -116.2200      10.0       183       182       100
VIS    2025250     91400   20.7500 -117.0400       7.7       160       185        95
VIS    2025250     91400   20.7500 -117.0600       7.7       160       183        94
VIS    2025250     91400   20.7700 -117.0900       8.7       166       184        96
VIS    2025250     91400   20.7600 -117.1000       8.7       165       182        97
VIS    2025250     91400   20.7700 -117.1500       8.5       167       183        99
VIS    2025250     91400   20.7600 -117.1500       7.9       165       181        99
VIS    2025250     91400   20.7700 -117.2000       7.7       170       179        99
VIS    2025250     91400   20.7500 -117.2300       6.3       174       175       100
VIS    2025250     91400   20.7500 -117.2400       6.3       174       175       100
VIS    2025250     91400   20.7500 -117.2800       7.8       170       180        99
VIS    2025250     91400   20.7500 -117.3200       6.4       169       182        99
VIS    2025250     91400   20.7500 -117.3200       6.0       168       183        97
VIS    2025250     91400   20.9800 -110.0700       9.9        24       112        99
VIS    2025250     91400   20.9800 -110.0800       9.4        25       113        98
VIS    2025250     91400   20.9700 -110.1500       7.0       353       119        94
VIS    2025250     91400   20.9600 -110.1900       8.2        25       133        99
VIS    2025250     91400   20.9600 -110.2000       8.0        18       131        99
VIS    2025250     91400   20.9700 -110.2300       7.7         5       140        97
VIS    2025250     91400   20.9600 -110.3100       4.0       344       163        97
VIS    2025250     91400   20.9700 -110.3200       4.1       342       164        99
VIS    2025250     91400   20.7800 -115.8100      12.0       151       185       100
VIS    2025250     91400   20.7700 -115.8500      10.7       150       181       100
VIS    2025250     91400   20.7800 -115.8900       9.8       150       176       100
VIS    2025250     91400   20.7700 -115.9200      10.0       156       172       100
VIS    2025250     91400   20.7800 -115.9400      10.3       161       167       100
VIS    2025250     91400   20.7700 -115.9700      11.2       169       169       100
VIS    2025250     91400   20.7800 -115.9800      11.3       170       167       100
VIS    2025250     91400   20.7600 -116.0100      11.1       172       175       100
VIS    2025250     91400   20.7600 -116.0500      10.8       174       173       100
VIS    2025250     91400   20.7600 -116.0900      10.8       178       177        99
VIS    2025250     91400   20.7700 -116.1100      11.0       177       177        99
VIS    2025250     91400   20.7700 -116.1200      11.0       179       178        99
VIS    2025250     91400   20.7700 -116.1700      11.3       188       182        97
VIS    2025250     91400   20.7700 -116.1700      11.2       189       180        98
VIS    2025250     91400   20.7500 -117.0600       7.7       160       183        96
VIS    2025250     91400   20.7300 -117.0800       7.8       160       182        96
VIS    2025250     91400   20.7500 -117.1100       8.6       164       180        96
VIS    2025250     91400   20.7300 -117.1400       5.7       155       173        98
VIS    2025250     91400   20.7400 -117.1800       6.9       163       177        93
VIS    2025250     91400   20.7500 -117.1800       7.1       166       177        94
VIS    2025250     91400   20.7400 -117.2400       6.1       175       175       100
VIS    2025250     91400   20.7400 -117.2600       7.4       169       178       100
VIS    2025250     91400   20.7400 -117.2700       7.5       170       180       100
VIS    2025250     91400   20.7400 -117.3200       6.4       172       182        95
VIS    2025250     91400   20.7300 -117.3400       5.5       182       181        93
VIS    2025250     91400   20.7300 -117.3800       5.5       203       182        93
VIS    2025250     91400   20.9400 -110.0600      10.8        17       115        99
VIS    2025250     91400   20.9400 -110.0900       9.5        16       116        95
VIS    2025250     91400   20.9400 -110.1200       8.5        19       116        98
VIS    2025250     91400   20.9400 -110.1700       8.6        30       133        94
VIS    2025250     91400   20.9500 -110.2000       8.6        28       133       100
VIS    2025250     91400   20.9200 -110.2500       6.9        24       178       100
VIS    2025250     91400   20.9400 -110.2700       6.8        14       169        90
VIS    2025250     91400   20.7400 -115.9000      10.6       154       174        96
VIS    2025250     91400   20.7400 -115.9000      10.7       155       174        98
VIS    2025250     91400   20.7500 -115.9500      10.9       165       170       100
VIS    2025250     91400   20.7600 -115.9500      11.0       166       167       100
VIS    2025250     91400   20.7500 -115.9800      11.3       170       173       100
VIS    2025250     91400   20.7500 -116.0200      11.0       173       177       100
VIS    2025250     91400   20.7400 -116.0400      10.7       175       179       100
VIS    2025250     91400   20.7500 -116.0800      10.6       180       177       100
VIS    2025250     91400   20.7500 -116.1000      10.8       179       178        99
VIS    2025250     91400   20.7500 -116.1300      11.1       181       178        99
VIS    2025250     91400   20.7200 -117.0600       7.4       156       183        95
VIS    2025250     91400   20.7200 -117.0800       7.8       160       181        98
VIS    2025250     91400   20.7100 -117.1200       6.2       160       176        99
VIS    2025250     91400   20.7200 -117.1500       5.4       155       173        98
VIS    2025250     91400   20.7000 -117.1600       4.7       152       171       100
VIS    2025250     91400   20.7000 -117.2000       5.0       165       166       100
VIS    2025250     91400   20.7000 -117.2400       6.2       174       168       100
VIS    2025250     91400   20.7000 -117.2500       6.4       173       169       100
VIS    2025250     91400   20.7200 -117.2700       8.1       168       176        99
VIS    2025250     91400   20.7000 -117.3500       6.4       197       180        94
VIS    2025250     91400   20.7100 -117.3800       6.2       204       182        98
VIS    2025250     91400   20.7000 -117.3900       7.0       203       181        99
VIS    2025250     91400   20.6700 -118.2600       4.1        97       186        99
VIS    2025250     91400   20.9500 -109.2500      14.5        52       110        93
VIS    2025250     91400   20.9200 -110.0700      10.2        15       116        94
VIS    2025250     91400   20.9200 -110.0900      10.5        11       116        96
VIS    2025250     91400   20.9100 -110.1500       8.9        33       131        92
VIS    2025250     91400   20.9100 -110.1600       8.7        30       141        90
VIS    2025250     91400   20.9000 -110.2200       6.5        35       184        90
VIS    2025250     91400   20.7200 -115.9100      10.6       156       180        98
VIS    2025250     91400   20.7200 -115.9300      11.0       160       173       100
VIS    2025250     91400   20.7100 -115.9700      10.9       165       182       100
VIS    2025250     91400   20.7300 -116.0100      10.9       172       182       100
VIS    2025250     91400   20.7300 -116.0200      10.9       173       182       100
VIS    2025250     91400   20.7200 -116.1200      10.7       179       184        97
VIS    2025250     91400   20.7300 -116.1300      11.1       182       185        99
VIS    2025250     91400   20.6800 -117.0300       8.4       172       186       100
VIS    2025250     91400   20.6800 -117.0800       8.3       169       181       100
VIS    2025250     91400   20.6800 -117.0900       7.6       170       180       100
VIS    2025250     91400   20.6800 -117.1200       4.8       163       175        99
VIS    2025250     91400   20.6900 -117.1400       4.3       161       173        98
VIS    2025250     91400   20.6900 -117.1700       4.4       153       170        98
VIS    2025250     91400   20.6900 -117.2400       6.1       173       168        99
VIS    2025250     91400   20.6900 -117.2500       6.3       172       168        98
VIS    2025250     91400   20.6800 -117.2900       7.2       171       180        95
VIS    2025250     91400   20.6700 -117.3600       7.2       199       179       100
VIS    2025250     91400   20.6800 -117.3900       7.7       201       181       100
VIS    2025250     91400   20.6700 -117.4100       8.2       202       181       100
VIS    2025250     91400   20.6700 -117.4300       7.8       205       183       100
VIS    2025250     91400   20.6600 -118.2600       4.0       100       186       100
VIS    2025250     91400   20.6500 -118.2700       4.0       109       186        93
VIS    2025250     91400   20.6400 -118.3700       4.4       124       187       100
VIS    2025250     91400   20.6500 -118.4000       4.3       120       188       100
VIS    2025250     91400   20.8800 -109.9200      10.7        13       115       100
VIS    2025250     91400   20.8800 -109.9600       6.5        17       115        98
VIS    2025250     91400   20.9000 -109.9800       5.4        17       114        97
VIS    2025250     91400   20.9000 -110.0000       4.7        16       114        96
VIS    2025250     91400   20.8900 -110.0600      12.5         6       116        99
VIS    2025250     91400   20.8800 -110.0700      11.6         7       119        99
VIS    2025250     91400   20.8900 -110.1100       9.1        28       130        92
VIS    2025250     91400   20.9000 -110.1400       9.1        35       133        96
VIS    2025250     91400   20.6700 -117.0600       9.1       172       185       100
VIS    2025250     91400   20.6500 -117.0800       8.0       174       184       100
VIS    2025250     91400   20.6500 -117.1000       6.9       173       181       100
VIS    2025250     91400   20.6500 -117.1300       4.6       169       175       100
VIS    2025250     91400   20.6500 -117.2100       4.7       178       163        99
VIS    2025250     91400   20.6600 -117.2300       4.3       171       164        99
VIS    2025250     91400   20.6600 -117.2800       4.6       173       170       100
VIS    2025250     91400   20.6700 -117.2900       5.6       178       177        99
VIS    2025250     91400   20.6500 -117.3600       7.1       199       179       100
VIS    2025250     91400   20.6500 -117.3800       7.5       199       179       100
VIS    2025250     91400   20.6400 -117.4000       7.5       200       179       100
VIS    2025250     91400   20.6600 -117.4300       7.7       205       181       100
VIS    2025250     91400   20.6300 -118.2000       4.4       104       187       100
VIS    2025250     91400   20.6400 -118.2000       4.3       103       187       100
VIS    2025250     91400   20.6200 -118.2400       4.7        89       184        92
VIS    2025250     91400   20.6200 -118.2600       4.2       101       184        97
VIS    2025250     91400   20.6200 -118.3100       4.0       116       188        95
VIS    2025250     91400   20.6200 -118.3400       4.4       116       187       100
VIS    2025250     91400   20.6400 -118.3400       4.5       126       188        99
VIS    2025250     91400   20.6400 -118.3700       4.4       123       187       100
VIS    2025250     91400   20.8800 -109.6200      22.5       350       110        91
VIS    2025250     91400   20.8900 -109.6500      22.7       351       110        90
VIS    2025250     91400   20.8600 -109.9100       9.2        22       115       100
VIS    2025250     91400   20.8700 -109.9200      10.3        19       115        98
VIS    2025250     91400   20.8800 -109.9800       6.0        16       115        99
VIS    2025250     91400   20.8600 -110.1500       9.0        45       152       100
VIS    2025250     91400   20.6400 -117.0400       7.5       177       186       100
VIS    2025250     91400   20.6400 -117.0900       7.7       177       185       100
VIS    2025250     91400   20.6500 -117.0900       7.4       175       183       100
VIS    2025250     91400   20.6200 -117.1400       4.9       176       177       100
VIS    2025250     91400   20.6300 -117.1600       4.1       175       174        98
VIS    2025250     91400   20.6400 -117.1800       4.1       177       168       100
VIS    2025250     91400   20.6300 -117.2200       5.1       177       164       100
VIS    2025250     91400   20.6300 -117.2600       5.5       164       165       100
VIS    2025250     91400   20.6400 -117.2700       5.0       161       164       100
VIS    2025250     91400   20.6300 -117.3400       5.5       202       179       100
VIS    2025250     91400   20.6300 -117.3700       6.5       201       179       100
VIS    2025250     91400   20.6200 -117.3900       6.6       200       179        99
VIS    2025250     91400   20.6200 -117.4200       6.7       199       180       100
VIS    2025250     91400   20.6300 -117.4300       6.6       202       180       100
VIS    2025250     91400   20.5900 -118.2300       5.1       100       185       100
VIS    2025250     91400   20.6000 -118.2400       5.0       100       184       100
VIS    2025250     91400   20.6100 -118.2600       4.3       100       184        99
VIS    2025250     91400   20.6000 -118.3400       4.2       107       186       100
VIS    2025250     91400   20.6100 -118.3700       4.3       114       186       100
VIS    2025250     91400   20.6100 -118.3700       4.1       113       186       100
VIS    2025250     91400   20.8800 -109.0000      13.1        98       134       100
VIS    2025250     91400   20.8300 -109.8900       8.1        22       115        94
VIS    2025250     91400   20.8300 -109.9200       7.3        30       115        96
VIS    2025250     91400   20.8500 -110.0700       8.8        14       126        95
VIS    2025250     91400   20.8500 -110.0800       9.0        13       126        91
VIS    2025250     91400   20.6100 -117.0600       6.9       180       187        99
VIS    2025250     91400   20.6200 -117.1400       5.2       178       178       100
VIS    2025250     91400   20.6200 -117.1500       4.7       176       177        99
VIS    2025250     91400   20.6000 -117.2000       4.6       184       174       100
VIS    2025250     91400   20.6100 -117.2300       5.6       173       169       100
VIS    2025250     91400   20.6000 -117.2500       5.1       168       169       100
VIS    2025250     91400   20.6100 -117.2700       4.5       163       168       100
VIS    2025250     91400   20.6000 -117.3200       4.2       177       175       100
VIS    2025250     91400   20.6000 -117.3600       6.3       184       179        99
VIS    2025250     91400   20.6100 -117.3900       6.5       200       179       100
VIS    2025250     91400   20.6000 -117.4100       6.5       198       180       100
VIS    2025250     91400   20.5900 -117.4400       6.7       200       183       100
VIS    2025250     91400   20.5900 -117.4900       5.9       192       185        99
VIS    2025250     91400   20.5900 -117.4900       5.9       189       186        99
VIS    2025250     91400   20.5900 -118.2200       5.0       104       186       100
VIS    2025250     91400   20.5700 -118.2400       5.0        99       184        99
VIS    2025250     91400   20.5700 -118.2800       4.0       103       184       100
VIS    2025250     91400   20.5700 -118.4400       4.8       108       183        99
VIS    2025250     91400   20.8500 -109.0200      12.6        94       135        97
VIS    2025250     91400   20.8600 -109.0300      12.6        97       132        99
VIS    2025250     91400   20.8200 -109.9100       7.0        31       115        99
VIS    2025250     91400   20.5800 -117.1600       6.1       183       184       100
VIS    2025250     91400   20.5800 -117.2000       4.9       188       178       100
VIS    2025250     91400   20.5700 -117.2200       5.4       188       177       100
VIS    2025250     91400   20.5900 -117.2600       4.1       165       169       100
VIS    2025250     91400   20.5800 -117.3500       6.5       178       177        91
VIS    2025250     91400   20.5900 -117.4000       6.5       196       181        98
VIS    2025250     91400   20.5900 -117.4000       6.5       197       181        99
VIS    2025250     91400   20.5900 -117.4400       6.8       199       182       100
VIS    2025250     91400   20.5800 -117.4600       6.2       199       184       100
VIS    2025250     91400   20.5800 -117.5000       6.0       180       185        91
VIS    2025250     91400   20.5600 -118.2300       4.6       104       187        98
VIS    2025250     91400   20.5600 -118.2300       4.8       100       184        99
VIS    2025250     91400   20.5600 -118.4500       4.3       115       183        99
VIS    2025250     91400   20.8200 -109.0400      12.8        92       129       100
VIS    2025250     91400   20.7900 -110.0700       9.2        31       151        98
VIS    2025250     91400   20.5600 -117.2000       6.2       191       183        97
VIS    2025250     91400   20.5600 -117.2300       5.9       187       180        99
VIS    2025250     91400   20.5400 -117.2700       6.6       184       175        95
VIS    2025250     91400   20.5600 -117.4000       5.8       190       181        99
VIS    2025250     91400   20.5600 -117.4500       7.1       202       185       100
VIS    2025250     91400   20.5500 -117.4900       6.8       201       182        99
VIS    2025250     91400   20.5400 -117.5300       4.9       190       184       100
VIS    2025250     91400   20.7600 -109.8200      11.9        32       113        98
VIS    2025250     91400   20.7600 -109.8300      11.4        32       113        96
VIS    2025250     91400   20.7800 -109.9000      14.2         5       114        93
VIS    2025250     91400   20.5400 -117.2500       7.1       185       179        97
VIS    2025250     91400   20.5400 -117.2600       7.2       186       177        93
VIS    2025250     91400   20.5300 -117.2900       5.9       193       175        94
VIS    2025250     91400   20.5200 -117.3400       4.4       182       174        99
VIS    2025250     91400   20.5300 -117.3800       4.4       181       176       100
VIS    2025250     91400   20.5200 -117.4800       5.8       211       180       100
VIS    2025250     91400   20.5100 -117.5000       5.0       216       178        99
VIS    2025250     91400   20.5300 -117.5100       5.6       199       180       100
VIS    2025250     91400   20.7400 -109.8200      12.4        32       114       100
VIS    2025250     91400   20.7300 -109.8400      12.2        32       114       100
VIS    2025250     91400   20.7400 -109.9000      11.8        19       113        92
VIS    2025250     91400   20.5400 -115.7500      12.8       152       182       100
VIS    2025250     91400   20.5400 -115.7700      12.6       153       180       100
VIS    2025250     91400   20.5300 -116.2000       6.6       187       172        92
VIS    2025250     91400   20.4900 -117.3200       5.4       195       177       100
VIS    2025250     91400   20.4900 -117.3300       5.0       187       177       100
VIS    2025250     91400   20.5100 -117.3500       4.5       182       174        98
VIS    2025250     91400   20.5000 -117.6800       6.1       135       180        99
VIS    2025250     91400   20.4900 -117.7100       5.2       148       167        92
VIS    2025250     91400   20.4800 -117.7500       4.0       138       174        97
VIS    2025250     91400   20.4600 -118.5600       4.2        54       171        98
VIS    2025250     91400   20.7100 -109.8300      12.4        27       115        96
VIS    2025250     91400   20.7300 -109.8400      12.4        32       114        99
VIS    2025250     91400   20.7100 -109.9100      11.3        22       116        92
VIS    2025250     91400   20.7000 -109.9900       8.7        31       127        99
VIS    2025250     91400   20.7000 -110.0000       9.1        30       137        99
VIS    2025250     91400   20.5200 -115.7100      13.2       151       175       100
VIS    2025250     91400   20.5300 -115.7400      13.0       152       175       100
VIS    2025250     91400   20.5300 -115.7500      12.9       153       181       100
VIS    2025250     91400   20.5200 -115.7800      12.0       153       175       100
VIS    2025250     91400   20.5200 -115.8100      12.0       156       182       100
VIS    2025250     91400   20.5100 -115.9900      13.4       164       184        94
VIS    2025250     91400   20.4800 -117.3000       6.1       203       184       100
VIS    2025250     91400   20.4900 -117.3300       4.8       186       178       100
VIS    2025250     91400   20.4600 -117.4500       4.0       206       184        99
VIS    2025250     91400   20.4700 -117.7400       4.6       137       168        96
VIS    2025250     91400   20.4500 -118.5600       4.2        52       171        96
VIS    2025250     91400   20.4400 -118.5900       4.3        46       172        99
VIS    2025250     91400   20.7000 -109.8200      12.7        26       115        99
VIS    2025250     91400   20.7000 -109.8600      12.6        27       116        93
VIS    2025250     91400   20.6800 -109.9400      10.2        27       117        90
VIS    2025250     91400   20.6900 -110.0000       9.7        29       156        97
VIS    2025250     91400   20.5100 -115.6800      12.9       151       173        99
VIS    2025250     91400   20.5100 -115.7100      12.9       151       171       100
VIS    2025250     91400   20.5100 -115.7300      12.6       151       170       100
VIS    2025250     91400   20.5000 -115.7500      11.9       152       171       100
VIS    2025250     91400   20.5000 -115.8000      11.8       154       177       100
VIS    2025250     91400   20.5000 -115.8100      11.8       156       178       100
VIS    2025250     91400   20.4800 -116.0400      12.8       171       159        99
VIS    2025250     91400   20.4400 -117.4700       4.2       195       184       100
VIS    2025250     91400   20.4100 -118.3800       4.2        90       175       100
VIS    2025250     91400   20.4300 -118.5700       4.1        54       170        99
VIS    2025250     91400   20.4100 -118.6100       4.3        71       164        99
VIS    2025250     91400   20.4100 -118.6400       4.4        74       163        97
VIS    2025250     91400   20.6900 -109.5600      22.1         8       104        98
VIS    2025250     91400   20.6800 -109.5800      22.2         7       104        97
VIS    2025250     91400   20.6600 -109.8000       8.5        48       110        95
VIS    2025250     91400   20.6500 -109.9500       8.9        27       119        99
VIS    2025250     91400   20.6500 -109.9900       9.1        32       165        94
VIS    2025250     91400   20.4800 -115.6800      12.1       150       173        94
VIS    2025250     91400   20.4600 -115.7200      11.7       150       172        97
VIS    2025250     91400   20.4800 -115.7400      12.0       151       171        99
VIS    2025250     91400   20.4600 -115.7600      11.5       151       175       100
VIS    2025250     91400   20.4700 -115.7900      11.7       151       179       100
VIS    2025250     91400   20.4700 -115.8100      11.6       153       185       100
VIS    2025250     91400   20.4600 -115.9800      11.3       162       150       100
VIS    2025250     91400   20.4600 -116.0200      12.2       168       153        97
VIS    2025250     91400   20.4600 -116.0500      12.4       169       159        99
VIS    2025250     91400   20.4500 -116.0700      12.4       172       159       100
VIS    2025250     91400   20.4600 -116.1000      12.1       174       182       100
VIS    2025250     91400   20.4100 -118.1200       4.2        88       185        94
VIS    2025250     91400   20.4000 -118.1600       4.8        81       185        97
VIS    2025250     91400   20.3900 -118.3700       5.3        89       166       100
VIS    2025250     91400   20.3900 -118.3800       5.1        90       166       100
VIS    2025250     91400   20.3900 -118.6200       4.2        74       161        96
VIS    2025250     91400   20.3800 -118.6300       4.0        70       160        95
VIS    2025250     91400   20.6600 -109.5800      22.4         8       104        97
VIS    2025250     91400   20.6400 -109.8000       8.3        54       109        99
VIS    2025250     91400   20.6400 -109.9400       8.8        23       119        92
VIS    2025250     91400   20.6500 -109.9500       8.7        24       119        92
VIS    2025250     91400   20.4400 -115.6700      12.1       147       178       100
VIS    2025250     91400   20.4500 -115.7000      11.9       146       178       100
VIS    2025250     91400   20.4500 -115.7200      11.6       147       178        93
VIS    2025250     91400   20.4600 -115.7600      11.5       150       176       100
VIS    2025250     91400   20.4500 -115.7600      11.4       150       176       100
VIS    2025250     91400   20.4600 -115.8000      11.6       150       182       100
VIS    2025250     91400   20.4300 -115.9800       9.9       163       150        96
VIS    2025250     91400   20.4400 -115.9900      11.2       166       150        96
VIS    2025250     91400   20.4400 -116.0300      11.8       167       152        98
VIS    2025250     91400   20.4400 -116.0600      12.0       167       156        98
VIS    2025250     91400   20.4400 -116.0800      12.4       170       159       100
VIS    2025250     91400   20.4500 -116.1100      12.3       175       182       100
VIS    2025250     91400   20.3900 -117.4900       4.5       158       180        97
VIS    2025250     91400   20.3800 -117.5500       4.5       163       180        97
VIS    2025250     91400   20.4000 -117.5700       4.2       171       183       100
VIS    2025250     91400   20.3900 -117.7400       4.0       135       187        96
VIS    2025250     91400   20.3700 -118.1300       4.6        88       184        94
VIS    2025250     91400   20.3700 -118.1400       4.7        89       184        92
VIS    2025250     91400   20.3700 -118.2500       4.0        93       181        98
VIS    2025250     91400   20.3800 -118.3800       5.1        88       165       100
VIS    2025250     91400   20.3600 -118.4700       4.8        93       161        98
VIS    2025250     91400   20.3600 -118.5000       4.3        95       162        98
VIS    2025250     91400   20.6000 -109.9100      11.2        28       119        93
VIS    2025250     91400   20.6200 -109.9400       8.9        26       119        98
VIS    2025250     91400   20.6000 -109.9800       9.8        39       176        95
VIS    2025250     91400   20.4100 -115.7000      12.2       149       178        99
VIS    2025250     91400   20.4300 -115.7100      11.6       148       178        98
VIS    2025250     91400   20.4100 -115.7400      11.6       148       177       100
VIS    2025250     91400   20.4300 -115.7800      11.5       150       178       100
VIS    2025250     91400   20.4200 -115.8100      11.5       149       183       100
VIS    2025250     91400   20.4100 -115.8500      13.0       147       181        99
VIS    2025250     91400   20.4200 -115.8500      11.7       144       181        99
VIS    2025250     91400   20.4300 -115.8800      12.8       154       175        96
VIS    2025250     91400   20.4100 -115.9200      12.5       158       162       100
VIS    2025250     91400   20.4200 -115.9600      12.5       155       162        98
VIS    2025250     91400   20.4200 -115.9700      11.3       154       155        92
VIS    2025250     91400   20.4200 -115.9900      10.3       158       152        96
VIS    2025250     91400   20.4200 -116.0400      11.6       167       152        98
VIS    2025250     91400   20.4000 -116.0500      12.6       167       152        98
VIS    2025250     91400   20.4100 -116.1000      12.5       163       161        99
VIS    2025250     91400   20.4100 -116.1100      12.9       163       161        98
VIS    2025250     91400   20.4100 -116.1500      11.6       175       175       100
VIS    2025250     91400   20.3600 -117.5000       6.1       140       180       100
VIS    2025250     91400   20.3700 -117.5200       5.1       141       179        97
VIS    2025250     91400   20.3800 -117.5500       4.5       155       180        99
VIS    2025250     91400   20.3600 -117.5600       5.1       138       182        96
VIS    2025250     91400   20.3600 -117.6400       7.3       147       179       100
VIS    2025250     91400   20.3600 -117.6600       7.4       143       178       100
VIS    2025250     91400   20.3800 -117.6900       6.2       129       176       100
VIS    2025250     91400   20.3500 -117.7300       6.4       119       185        97
VIS    2025250     91400   20.3700 -118.0600       4.3        88       187        96
VIS    2025250     91400   20.3500 -118.1100       4.4        88       187        90
VIS    2025250     91400   20.3600 -118.1300       4.5        88       184        93
VIS    2025250     91400   20.3600 -118.1500       4.7        89       182        96
VIS    2025250     91400   20.3400 -118.2500       4.1        99       181       100
VIS    2025250     91400   20.3500 -118.4800       4.8        94       162        98
VIS    2025250     91400   20.3500 -118.5000       4.7        95       162        96
VIS    2025250     91400   20.3400 -118.7600       6.6       341       184        98
VIS    2025250     91400   20.3500 -118.7800       6.4       339       188        98
VIS    2025250     91400   20.5900 -109.6100      14.8        63       109        98
VIS    2025250     91400   20.5900 -109.6600      15.4        50       110        98
VIS    2025250     91400   20.5900 -109.7000      15.5        47       104       100
VIS    2025250     91400   20.5900 -109.7900      15.5        19       114       100
VIS    2025250     91400   20.5800 -109.9600      11.0        38       145        99
VIS    2025250     91400   20.5700 -109.9800      11.1        37       166       100
VIS    2025250     91400   20.3900 -115.6700      13.0       144       179        99
VIS    2025250     91400   20.4000 -115.6900      12.4       148       178        98
VIS    2025250     91400   20.4100 -115.7400      11.7       148       177        99
VIS    2025250     91400   20.4000 -115.7500      12.1       148       178       100
VIS    2025250     91400   20.4100 -115.7700      11.6       149       178       100
VIS    2025250     91400   20.3800 -115.8700      12.5       149       178        94
VIS    2025250     91400   20.3800 -115.9100      12.1       161       151        91
VIS    2025250     91400   20.3800 -115.9200      12.0       161       152        93
VIS    2025250     91400   20.4000 -115.9600      11.7       157       162        97
VIS    2025250     91400   20.4000 -115.9900      10.9       155       155        95
VIS    2025250     91400   20.4000 -116.0000      10.8       155       155        96
VIS    2025250     91400   20.3800 -116.0400      11.9       160       153        99
VIS    2025250     91400   20.3800 -116.0800      11.8       166       151        97
VIS    2025250     91400   20.3800 -116.0900      11.5       164       152        98
VIS    2025250     91400   20.4000 -116.1200      13.6       160       161        96
VIS    2025250     91400   20.3800 -116.1400      13.0       174       161        99
VIS    2025250     91400   20.3700 -116.1800      11.1       178       167        98
VIS    2025250     91400   20.3700 -116.2000      11.0       175       173       100
VIS    2025250     91400   20.3500 -117.5000       5.7       140       181       100
VIS    2025250     91400   20.3500 -117.5100       5.3       140       184        98
VIS    2025250     91400   20.3400 -117.5400       5.9       133       183        98
VIS    2025250     91400   20.3300 -117.5700       5.7       130       187        96
VIS    2025250     91400   20.3300 -117.6400       5.2       137       181        99
VIS    2025250     91400   20.3400 -117.6500       5.9       139       181       100
VIS    2025250     91400   20.3500 -117.7300       6.4       117       185        97
VIS    2025250     91400   20.3200 -118.2500       4.3        95       179       100
VIS    2025250     91400   20.3200 -118.5000       4.2        90       162        93
VIS    2025250     91400   20.3200 -118.7800       6.6       339       183        99
VIS    2025250     91400   20.5800 -109.6300      15.9        56       110        93
VIS    2025250     91400   20.5800 -109.6700      15.4        50       113        99
VIS    2025250     91400   20.5700 -109.7000      15.5        48       117        98
VIS    2025250     91400   20.5600 -109.7800      15.6        22       124        98
VIS    2025250     91400   20.5700 -109.7800      15.7        22       116        99
VIS    2025250     91400   20.5500 -109.9500      11.3        35       167        94
VIS    2025250     91400   20.5700 -109.9800      11.2        38       167       100
VIS    2025250     91400   20.3600 -115.6300      12.7       144       185       100
VIS    2025250     91400   20.3800 -115.6400      14.9       144       185        91
VIS    2025250     91400   20.3700 -115.6700      12.7       143       181        99
VIS    2025250     91400   20.3800 -115.6900      12.7       146       178       100
VIS    2025250     91400   20.3600 -115.7200      13.3       143       178        99
VIS    2025250     91400   20.3800 -115.7500      12.8       146       179       100
VIS    2025250     91400   20.3800 -115.9200      12.0       161       150        92
VIS    2025250     91400   20.3500 -115.9700      11.3       163       152        99
VIS    2025250     91400   20.3700 -115.9800      11.5       159       155        94
VIS    2025250     91400   20.3700 -116.0200      11.7       158       155        98
VIS    2025250     91400   20.3700 -116.0400      11.9       160       153        99
VIS    2025250     91400   20.3700 -116.0800      10.6       166       151       100
VIS    2025250     91400   20.3600 -116.1000      10.4       165       146        98
VIS    2025250     91400   20.3500 -116.1400      12.0       174       145       100
VIS    2025250     91400   20.3500 -116.1700      11.8       178       145       100
VIS    2025250     91400   20.3500 -116.1800      11.4       178       154       100
VIS    2025250     91400   20.3700 -116.2000      10.9       176       173        99
VIS    2025250     91400   20.3500 -116.2300      11.4       173       184       100
VIS    2025250     91400   20.3300 -117.5200       5.0       139       185       100
VIS    2025250     91400   20.3300 -117.5500       6.1       135       185        99
VIS    2025250     91400   20.3300 -117.5700       5.8       130       187        98
VIS    2025250     91400   20.3100 -117.6200       4.7       123       182        99
VIS    2025250     91400   20.3200 -117.6300       4.8       130       182        99
VIS    2025250     91400   20.3200 -117.7400       6.2        88       185        93
VIS    2025250     91400   20.3000 -118.2500       4.3        96       177       100
VIS    2025250     91400   20.2900 -118.2800       4.1        98       174       100
VIS    2025250     91400   20.5400 -109.6600      15.0        46       119       100
VIS    2025250     91400   20.5500 -109.6800      15.2        47       119        98
VIS    2025250     91400   20.5400 -109.7200      14.4        47       133        94
VIS    2025250     91400   20.5500 -109.7700      15.5        24       124        96
VIS    2025250     91400   20.5400 -109.8000      15.2        23       124        99
VIS    2025250     91400   20.5400 -109.9600      11.3        35       167        94
VIS    2025250     91400   20.3400 -115.5700      12.4       140       182        99
VIS    2025250     91400   20.3400 -115.5900      12.2       142       183       100
VIS    2025250     91400   20.3400 -115.6300      12.6       146       179       100
VIS    2025250     91400   20.3400 -115.6500      12.3       143       181        99
VIS    2025250     91400   20.3600 -115.7100      13.3       143       179        99
VIS    2025250     91400   20.3300 -115.7500      12.7       144       179       100
VIS    2025250     91400   20.3300 -115.7700      12.4       146       178       100
VIS    2025250     91400   20.3500 -115.7900      12.1       148       180       100
VIS    2025250     91400   20.3500 -115.8600       9.5       143       179        93
VIS    2025250     91400   20.3400 -115.8900       9.9       148       176        97
VIS    2025250     91400   20.3300 -115.9400      11.2       159       150        93
VIS    2025250     91400   20.3300 -115.9700      10.6       162       151        99
VIS    2025250     91400   20.3300 -115.9800       9.9       161       150       100
VIS    2025250     91400   20.3400 -116.0300       9.9       160       147        98
VIS    2025250     91400   20.3500 -116.0400      10.9       162       149       100
VIS    2025250     91400   20.3300 -116.0700      10.3       165       142        99
VIS    2025250     91400   20.3200 -116.1100      10.1       170       141       100
VIS    2025250     91400   20.3200 -116.1500      11.2       177       142        99
VIS    2025250     91400   20.3300 -116.1500      11.4       178       143        98
VIS    2025250     91400   20.3300 -116.1800      11.3       179       144       100
VIS    2025250     91400   20.3400 -116.2100      10.7       178       158        99
VIS    2025250     91400   20.3300 -116.2500      10.0       181       184       100
VIS    2025250     91400   20.3000 -117.5200       4.6       152       186        99
VIS    2025250     91400   20.3000 -117.5700       6.5       135       187        97
VIS    2025250     91400   20.2900 -117.6000       5.2       120       181       100
VIS    2025250     91400   20.3000 -117.6100       4.9       116       182        99
VIS    2025250     91400   20.2800 -117.6300       5.1       115       179        98
VIS    2025250     91400   20.2900 -117.6600       4.5       116       178       100
VIS    2025250     91400   20.2600 -118.5600       4.2        49       159        98
VIS    2025250     91400   20.2700 -118.5800       4.0        43       160        97
VIS    2025250     91400   20.2700 -118.7400       4.0        10       166       100
VIS    2025250     91400   20.2500 -118.8000       5.2       355       171       100
VIS    2025250     91400   20.5300 -109.5500       6.2       109       121        91
VIS    2025250     91400   20.5100 -109.6400      12.4        54       156       100
VIS    2025250     91400   20.5200 -109.6700      14.5        46       133        98
VIS    2025250     91400   20.5300 -109.6700      14.8        46       124        98
VIS    2025250     91400   20.5200 -109.7000      14.4        45       141        96
VIS    2025250     91400   20.3200 -115.4700      15.0       143       183       100
VIS    2025250     91400   20.3300 -115.5300      14.2       144       180       100
VIS    2025250     91400   20.3300 -115.5300      14.1       144       178       100
VIS    2025250     91400   20.3200 -115.5600      13.5       146       178       100
VIS    2025250     91400   20.3200 -115.6000      12.6       146       177       100
VIS    2025250     91400   20.3300 -115.6300      12.6       146       178       100
VIS    2025250     91400   20.3300 -115.6500      12.3       144       178       100
VIS    2025250     91400   20.3300 -115.6800      12.0       141       181        99
VIS    2025250     91400   20.3100 -115.7300      13.0       148       179        99
VIS    2025250     91400   20.3100 -115.7500      12.8       148       178        97
VIS    2025250     91400   20.3200 -115.7600      12.5       146       178       100
VIS    2025250     91400   20.3200 -115.7900      11.8       146       177       100
VIS    2025250     91400   20.3100 -115.8200      11.4       147       178       100
VIS    2025250     91400   20.3300 -115.8700      10.2       150       181        98
VIS    2025250     91400   20.3300 -115.8900      10.2       149       179        98
VIS    2025250     91400   20.3000 -115.9200      11.2       149       179        96
VIS    2025250     91400   20.3200 -115.9500      10.6       157       150        91
VIS    2025250     91400   20.3200 -115.9600      10.2       158       150        96
VIS    2025250     91400   20.3200 -115.9900       9.8       159       150        99
VIS    2025250     91400   20.3000 -116.0200       9.0       160       147        99
VIS    2025250     91400   20.3200 -116.0600      10.3       161       144        98
VIS    2025250     91400   20.3200 -116.0800      10.4       167       141        99
VIS    2025250     91400   20.3200 -116.1100      10.1       169       141       100
VIS    2025250     91400   20.3000 -116.1300       9.7       173       139       100
VIS    2025250     91400   20.3100 -116.1700      10.3       178       144        99
VIS    2025250     91400   20.3100 -116.1800       9.9       180       149        99
VIS    2025250     91400   20.3000 -116.2100       9.1       186       153        99
VIS    2025250     91400   20.2800 -116.7100       7.9       163       184        98
VIS    2025250     91400   20.2800 -116.7400       7.8       165       182        99
VIS    2025250     91400   20.2900 -116.7500       8.0       166       184        99
VIS    2025250     91400   20.2900 -116.7800       8.5       167       185        98
VIS    2025250     91400   20.2900 -116.8000       9.4       166       185        97
VIS    2025250     91400   20.2700 -117.3200       4.8       191       185       100
VIS    2025250     91400   20.2600 -117.3700       6.1       181       182        98
VIS    2025250     91400   20.2700 -117.4000       5.4       173       182        95
VIS    2025250     91400   20.2800 -117.6000       5.3       124       181       100
VIS    2025250     91400   20.2700 -117.6100       5.1       122       181        97
VIS    2025250     91400   20.2700 -117.6300       5.0       114       179        97
VIS    2025250     91400   20.2700 -117.6700       4.5       111       178       100
VIS    2025250     91400   20.2500 -118.5800       4.1        40       160        99
VIS    2025250     91400   20.2400 -118.6200       4.3        11       164        99
VIS    2025250     91400   20.2400 -118.6700       5.3       350       168        99
VIS    2025250     91400   20.2200 -118.7800       5.1       350       169       100
VIS    2025250     91400   20.2400 -118.8000       5.2       354       171       100
VIS    2025250     91400   20.4800 -109.7600      10.8        41       164        91
VIS    2025250     91400   20.3000 -115.4700      14.8       141       182       100
VIS    2025250     91400   20.3100 -115.4800      15.0       143       182       100
VIS    2025250     91400   20.2900 -115.5100      13.5       142       177       100
VIS    2025250     91400   20.3000 -115.5300      13.9       144       177       100
VIS    2025250     91400   20.3100 -115.5600      13.8       147       178       100
VIS    2025250     91400   20.3100 -115.6100      12.9       149       175       100
VIS    2025250     91400   20.2900 -115.6400      12.6       149       175        98
VIS    2025250     91400   20.3000 -115.6500      12.5       148       176        99
VIS    2025250     91400   20.2800 -115.7300      13.1       150       180       100
VIS    2025250     91400   20.2900 -115.7300      13.3       149       179       100
VIS    2025250     91400   20.3000 -115.7600      12.6       146       178        97
VIS    2025250     91400   20.2900 -115.8000      11.8       147       178        99
VIS    2025250     91400   20.2800 -115.8300      10.9       148       180       100
VIS    2025250     91400   20.3000 -115.8700      10.6       152       181       100
VIS    2025250     91400   20.2800 -115.8900      11.2       149       173        99
VIS    2025250     91400   20.3000 -115.9200      11.2       149       179        96
VIS    2025250     91400   20.2900 -115.9500      11.9       153       153        94
VIS    2025250     91400   20.3000 -115.9600      11.3       153       153        97
VIS    2025250     91400   20.2800 -115.9900      10.9       159       151        99
VIS    2025250     91400   20.2800 -116.0200       9.1       165       145       100
VIS    2025250     91400   20.2800 -116.0600       9.1       170       140        98
VIS    2025250     91400   20.2700 -116.0800       9.3       172       139        99
VIS    2025250     91400   20.2800 -116.1200       9.2       171       139       100
VIS    2025250     91400   20.2800 -116.1300       9.4       174       139        99
VIS    2025250     91400   20.2800 -116.1600       9.9       173       142        99
VIS    2025250     91400   20.2900 -116.1800       9.8       177       149       100
VIS    2025250     91400   20.2900 -116.2100       9.0       185       153       100
VIS    2025250     91400   20.2800 -116.2500       9.3       190       159       100
VIS    2025250     91400   20.2700 -116.2700       9.7       189       175       100
VIS    2025250     91400   20.2600 -116.7100       8.3       165       182        99
VIS    2025250     91400   20.2800 -116.7300       7.9       166       182        99
VIS    2025250     91400   20.2700 -116.7400       7.2       166       180        92
VIS    2025250     91400   20.2700 -116.7900       9.9       168       182       100
VIS    2025250     91400   20.2700 -116.8000      10.3       167       182       100
VIS    2025250     91400   20.2400 -117.2800       4.4       179       187        99
VIS    2025250     91400   20.2400 -117.3300       4.2       194       185       100
VIS    2025250     91400   20.2400 -117.3600       5.2       188       181        98
VIS    2025250     91400   20.2600 -117.3900       5.3       177       182        94
VIS    2025250     91400   20.2500 -117.4200       4.9       172       182        90
VIS    2025250     91400   20.2500 -117.5800       7.1       140       186        95
VIS    2025250     91400   20.2300 -117.6400       4.7       110       183        98
VIS    2025250     91400   20.2200 -118.2000       4.6        83       181        96
VIS    2025250     91400   20.2300 -118.2900       4.1       100       173        93
VIS    2025250     91400   20.2200 -118.3400       5.1        47       171        94
VIS    2025250     91400   20.2200 -118.3500       5.1        46       171        94
VIS    2025250     91400   20.2200 -118.6300       5.5       357       168        99
VIS    2025250     91400   20.2100 -118.6600       5.9       352       168        99
VIS    2025250     91400   20.2200 -118.6800       5.7       352       168       100
VIS    2025250     91400   20.2100 -118.7800       5.0       350       171        99
VIS    2025250     91400   20.2200 -118.7800       5.1       349       170       100
VIS    2025250     91400   20.2200 -118.8200       5.0       346       172        94
VIS    2025250     91400   20.4600 -109.7700      10.9        38       175        94
VIS    2025250     91400   20.4700 -109.8500       5.8        19       178        93
VIS    2025250     91400   20.2900 -115.4700      14.7       140       182       100
VIS    2025250     91400   20.2900 -115.4800      14.5       139       181       100
VIS    2025250     91400   20.2800 -115.5200      12.9       141       176       100
VIS    2025250     91400   20.2900 -115.5400      12.9       143       175       100
VIS    2025250     91400   20.2700 -115.5700      12.9       146       175       100
VIS    2025250     91400   20.2800 -115.6100      13.1       150       175        98
VIS    2025250     91400   20.2600 -115.6500      11.8       146       178        96
VIS    2025250     91400   20.2600 -115.6500      11.6       146       178        97
VIS    2025250     91400   20.2700 -115.7400      11.5       144       182        99
VIS    2025250     91400   20.2600 -115.7900      11.3       141       179        99
VIS    2025250     91400   20.2600 -115.8200      11.1       146       181       100
VIS    2025250     91400   20.2600 -115.8300      10.6       146       181       100
VIS    2025250     91400   20.2600 -115.8700      10.2       145       173       100
VIS    2025250     91400   20.2700 -115.8800      10.7       147       170       100
VIS    2025250     91400   20.2500 -115.9300      11.3       149       158        99
VIS    2025250     91400   20.2500 -115.9500      11.7       154       154        99
VIS    2025250     91400   20.2700 -115.9800      11.1       159       152        99
VIS    2025250     91400   20.2700 -115.9900      10.9       160       151        99
VIS    2025250     91400   20.2600 -116.0200       9.2       168       145       100
VIS    2025250     91400   20.2600 -116.0600       9.3       171       140       100
VIS    2025250     91400   20.2500 -116.0800       9.3       175       139        99
VIS    2025250     91400   20.2500 -116.1200       9.7       179       141       100
VIS    2025250     91400   20.2500 -116.1300      10.1       181       145       100
VIS    2025250     91400   20.2600 -116.1600      10.5       176       147        99
VIS    2025250     91400   20.2500 -116.2100      10.8       185       156       100
VIS    2025250     91400   20.2500 -116.2200      10.9       187       156       100
VIS    2025250     91400   20.2500 -116.2700      10.4       190       173        98
VIS    2025250     91400   20.2400 -116.2800      10.4       190       175        97
VIS    2025250     91400   20.2400 -116.7000       7.8       166       184       100
VIS    2025250     91400   20.2400 -116.7300       7.3       168       179       100
VIS    2025250     91400   20.2300 -116.7700       6.9       168       180        98
VIS    2025250     91400   20.2300 -116.7800       7.8       166       181       100
VIS    2025250     91400   20.2500 -116.8100      11.9       164       182        95
VIS    2025250     91400   20.2500 -116.8500       9.6       165       185        96
VIS    2025250     91400   20.2400 -117.2800       4.6       180       187        99
VIS    2025250     91400   20.2200 -117.3100       4.1       188       186        99
VIS    2025250     91400   20.2300 -117.3300       4.0       194       185       100
VIS    2025250     91400   20.2200 -117.3600       4.1       190       181        99
VIS    2025250     91400   20.2200 -117.6200       4.3       100       183        99
VIS    2025250     91400   20.2000 -117.6500       4.3       103       184        98
VIS    2025250     91400   20.2000 -118.6600       6.7       345       168        96
VIS    2025250     91400   20.1900 -118.8100       5.4       336       173        95
VIS    2025250     91400   20.1900 -118.8400       4.9       336       176        96
VIS    2025250     91400   20.1800 -118.8500       4.7       338       176        91
VIS    2025250     91400   20.2600 -115.5000      13.7       139       182        99
VIS    2025250     91400   20.2600 -115.5300      12.4       142       178       100
VIS    2025250     91400   20.2500 -115.5500      12.3       141       178       100
VIS    2025250     91400   20.2600 -115.5800      12.7       144       176       100
VIS    2025250     91400   20.2600 -115.6000      12.3       145       175        99
VIS    2025250     91400   20.2500 -115.6200      11.8       142       178        98
VIS    2025250     91400   20.2600 -115.6500      11.6       146       182        94
VIS    2025250     91400   20.2300 -115.7700      11.4       144       182       100
VIS    2025250     91400   20.2500 -115.7900      11.4       142       180       100
VIS    2025250     91400   20.2500 -115.8200      10.9       146       181       100
VIS    2025250     91400   20.2500 -115.8500      10.1       145       181       100
VIS    2025250     91400   20.2500 -115.8800      10.4       146       170       100
VIS    2025250     91400   20.2300 -115.9200      10.9       151       160        99
VIS    2025250     91400   20.2300 -115.9400      11.3       153       155        99
VIS    2025250     91400   20.2400 -115.9700      11.2       159       153        99
VIS    2025250     91400   20.2300 -116.0000       9.1       170       152       100
VIS    2025250     91400   20.2300 -116.0200       8.6       172       150        99
VIS    2025250     91400   20.2400 -116.0700       9.4       177       139        99
VIS    2025250     91400   20.2400 -116.0900       9.4       179       139       100
VIS    2025250     91400   20.2400 -116.1100       9.8       180       140       100
VIS    2025250     91400   20.2400 -116.1300      10.1       181       145       100
VIS    2025250     91400   20.2200 -116.1800      11.7       184       147       100
VIS    2025250     91400   20.2200 -116.2000      11.6       187       155        99
VIS    2025250     91400   20.2400 -116.2300      11.0       188       157       100
VIS    2025250     91400   20.2300 -116.2600      10.5       189       169        97
VIS    2025250     91400   20.2400 -116.2700      10.5       190       173        97
VIS    2025250     91400   20.2300 -116.7400       7.1       172       178       100
VIS    2025250     91400   20.2200 -116.7700       7.2       170       181       100
VIS    2025250     91400   20.2200 -116.7800       7.3       167       181       100
VIS    2025250     91400   20.2100 -116.8000       7.0       165       181        97
VIS    2025250     91400   20.2100 -116.8300       6.2       185       181        97
VIS    2025250     91400   20.2100 -116.8800       6.2       177       184        98
VIS    2025250     91400   20.2100 -117.3100       4.1       189       187       100
VIS    2025250     91400   20.1700 -118.5100       4.3        28       164        97
VIS    2025250     91400   20.1700 -118.6400       5.4       338       176        91
VIS    2025250     91400   20.1600 -118.6500       6.5       337       174        96
VIS    2025250     91400   20.1700 -118.7300       6.0        19       170        92
VIS    2025250     91400   20.1600 -118.8400       4.9       331       176        97
VIS    2025250     91400   20.2300 -115.7700      11.5       144       183        99
VIS    2025250     91400   20.2200 -115.7900      11.5       143       182        99
VIS    2025250     91400   20.2300 -115.8200      10.4       142       184       100
VIS    2025250     91400   20.2300 -115.8500       9.8       143       181       100
VIS    2025250     91400   20.2200 -115.8700       9.7       144       170       100
VIS    2025250     91400   20.2100 -115.9100       9.1       149       166        96
VIS    2025250     91400   20.2100 -115.9400      10.8       155       159        98
VIS    2025250     91400   20.2200 -115.9500      11.4       156       155        99
VIS    2025250     91400   20.2000 -115.9800      10.4       161       155        99
VIS    2025250     91400   20.2200 -116.0100       8.9       170       152       100
VIS    2025250     91400   20.2200 -116.0400       8.5       173       150        99
VIS    2025250     91400   20.2000 -116.0900       9.6       181       140       100
VIS    2025250     91400   20.2200 -116.1000       9.7       182       139       100
VIS    2025250     91400   20.2000 -116.1300      10.6       177       136       100
VIS    2025250     91400   20.2100 -116.1500      11.1       181       140       100
VIS    2025250     91400   20.2100 -116.2000      11.4       186       147        99
VIS    2025250     91400   20.2200 -116.2000      11.6       187       155        99
VIS    2025250     91400   20.1900 -116.2500      10.2       185       164        98
VIS    2025250     91400   20.2100 -116.2600      10.2       186       167        95
VIS    2025250     91400   20.2000 -116.7200       6.6       178       184        96
VIS    2025250     91400   20.2000 -116.7500       7.5       174       181        97
VIS    2025250     91400   20.1900 -116.7800       8.7       162       182       100
VIS    2025250     91400   20.2000 -116.8000       8.3       163       182        97
VIS    2025250     91400   20.1800 -116.8300       6.8       186       181       100
VIS    2025250     91400   20.1800 -116.8700       6.4       176       182        90
VIS    2025250     91400   20.1700 -117.5300       4.9       129       186        99
VIS    2025250     91400   20.1400 -118.6400       5.1       334       182        92
VIS    2025250     91400   20.1300 -118.7700       5.4        20       172        98
VIS    2025250     91400   20.2000 -115.7500      11.4       145       184        98
VIS    2025250     91400   20.1900 -115.7900      10.7       138       184       100
VIS    2025250     91400   20.1900 -115.8300      10.2       139       183       100
VIS    2025250     91400   20.1900 -115.8400       9.8       140       180       100
VIS    2025250     91400   20.1900 -115.8800       8.8       141       175       100
VIS    2025250     91400   20.2000 -115.9000       8.6       144       167        98
VIS    2025250     91400   20.1900 -115.9400      10.1       155       160       100
VIS    2025250     91400   20.2000 -115.9400      10.6       156       160        98
VIS    2025250     91400   20.2000 -115.9800      10.3       161       155        98
VIS    2025250     91400   20.1800 -116.0100       9.4       162       150        99
VIS    2025250     91400   20.1900 -116.0400       8.7       168       149        99
VIS    2025250     91400   20.1900 -116.0800       9.5       177       141        96
VIS    2025250     91400   20.1800 -116.1100       9.4       171       138       100
VIS    2025250     91400   20.1700 -116.1400       9.7       172       135       100
VIS    2025250     91400   20.1900 -116.1500      10.7       177       135       100
VIS    2025250     91400   20.1700 -116.1700      10.7       179       135       100
VIS    2025250     91400   20.1900 -116.2000      10.9       185       146        99
VIS    2025250     91400   20.1700 -116.2500      10.5       185       160       100
VIS    2025250     91400   20.1700 -116.2700      10.9       186       167        99
VIS    2025250     91400   20.1700 -116.7500       7.4       180       184        96
VIS    2025250     91400   20.1700 -116.7900       9.5       152       182        91
VIS    2025250     91400   20.1600 -116.8400       7.2       187       182       100
VIS    2025250     91400   20.1700 -116.8600       6.8       180       182        97
VIS    2025250     91400   20.1500 -116.9200       4.6       174       185        98
VIS    2025250     91400   20.1200 -118.4800       4.3        24       168        98
VIS    2025250     91400   20.1000 -118.6500       4.9       345       182        95
VIS    2025250     91400   20.1000 -118.6600       5.1       343       182       100
VIS    2025250     91400   20.1100 -118.7600       4.7        26       172        99
VIS    2025250     91400   20.1600 -115.7600      10.8       143       182        99
VIS    2025250     91400   20.1700 -115.7600      10.7       142       183       100
VIS    2025250     91400   20.1700 -115.8000      10.6       138       184       100
VIS    2025250     91400   20.1800 -115.8200      10.6       139       182       100
VIS    2025250     91400   20.1700 -115.8700       9.5       143       177       100
VIS    2025250     91400   20.1700 -115.8900       8.9       144       175       100
VIS    2025250     91400   20.1500 -115.9200       9.3       150       171        92
VIS    2025250     91400   20.1500 -115.9600      10.1       157       153        97
VIS    2025250     91400   20.1700 -116.0000       9.9       161       150        98
VIS    2025250     91400   20.1700 -116.0300       9.6       161       146       100
VIS    2025250     91400   20.1500 -116.0700       9.8       165       144        99
VIS    2025250     91400   20.1600 -116.1000       8.5       169       143        96
VIS    2025250     91400   20.1700 -116.1000       8.9       169       143       100
VIS    2025250     91400   20.1700 -116.1400       9.5       171       135       100
VIS    2025250     91400   20.1600 -116.1700      10.2       178       135        99
VIS    2025250     91400   20.1500 -116.1900      10.0       179       134        95
VIS    2025250     91400   20.1500 -116.2100      10.1       184       139        99
VIS    2025250     91400   20.1600 -116.2500      10.5       187       151        99
VIS    2025250     91400   20.1600 -116.2700      11.0       187       166        98
VIS    2025250     91400   20.1400 -116.3100      10.9       190       185        97
VIS    2025250     91400   20.1500 -116.3600      12.4       203       185        99
VIS    2025250     91400   20.1300 -116.7300       6.7       180       181       100
VIS    2025250     91400   20.1400 -116.7500       6.0       183       180       100
VIS    2025250     91400   20.1300 -116.8500       7.3       227       184        93
VIS    2025250     91400   20.1200 -116.9000       6.7       162       183        96
VIS    2025250     91400   20.1300 -117.3000       4.2       206       187       100
VIS    2025250     91400   20.1200 -117.3900       4.4       164       186        93
VIS    2025250     91400   20.1000 -118.6700       5.0       348       182       100
VIS    2025250     91400   20.1000 -118.6800       5.4       340       182        97
VIS    2025250     91400   20.0700 -118.7800       4.0        21       172        95
VIS    2025250     91400   20.0800 -118.8000       4.8        36       172        99
VIS    2025250     91400   20.1900 -113.8500       8.2       161       141        93
VIS    2025250     91400   20.1900 -113.8500       8.1       163       141        94
VIS    2025250     91400   20.1500 -115.7800      10.4       140       182       100
VIS    2025250     91400   20.1300 -115.8000      10.0       140       182       100
VIS    2025250     91400   20.1300 -115.8400      10.6       144       177       100
VIS    2025250     91400   20.1300 -115.8700      10.7       152       174       100
VIS    2025250     91400   20.1300 -115.8900      10.3       155       171        99
VIS    2025250     91400   20.1300 -115.9100       9.9       156       167        98
VIS    2025250     91400   20.1500 -115.9600       9.3       152       153       100
VIS    2025250     91400   20.1500 -115.9600       9.9       157       152        96
VIS    2025250     91400   20.1300 -116.0200      10.9       160       148       100
VIS    2025250     91400   20.1300 -116.0200      11.0       160       148       100
VIS    2025250     91400   20.1400 -116.0500      11.0       158       144        99
VIS    2025250     91400   20.1400 -116.0900       8.3       169       145        93
VIS    2025250     91400   20.1400 -116.1300       8.1       170       140        98
VIS    2025250     91400   20.1300 -116.1400       8.2       172       140        99
VIS    2025250     91400   20.1200 -116.1900       8.7       180       133        93
VIS    2025250     91400   20.1200 -116.1900       8.8       181       133        91
VIS    2025250     91400   20.1200 -116.2200       9.7       186       136        98
VIS    2025250     91400   20.1300 -116.2600      10.1       188       145        99
VIS    2025250     91400   20.1300 -116.2700      10.2       187       154        97
VIS    2025250     91400   20.1300 -116.3000      10.4       188       180        96
VIS    2025250     91400   20.1200 -116.3700      15.0       188       182        99
VIS    2025250     91400   20.1000 -116.7300       8.0       177       185       100
VIS    2025250     91400   20.1100 -116.7700       7.4       176       182        96
VIS    2025250     91400   20.1000 -116.7900       7.7       177       182        99
VIS    2025250     91400   20.1200 -116.8600       7.6       236       183       100
VIS    2025250     91400   20.1200 -116.9100       6.8       164       183        97
VIS    2025250     91400   20.0900 -117.8800       9.7       118       184        98
VIS    2025250     91400   20.0900 -117.8900       9.7       116       185        98
VIS    2025250     91400   20.0800 -118.1300       4.4       222       187        90
VIS    2025250     91400   20.0700 -118.8100       5.0        34       172        99
VIS    2025250     91400   20.0500 -118.9200       8.3       356       177        91
VIS    2025250     91400   20.0400 -118.9300       8.0       356       177        94
VIS    2025250     91400   20.2800 -110.4300      11.6         5       789        98
VIS    2025250     91400   20.1700 -113.7700       8.0       165       137       100
VIS    2025250     91400   20.1700 -113.8100       8.1       161       138        95
VIS    2025250     91400   20.1900 -113.8200       8.0       158       141        94
VIS    2025250     91400   20.1800 -113.8500       7.6       164       141        95
VIS    2025250     91400   20.1700 -113.9100       6.9       167       142        98
VIS    2025250     91400   20.1100 -115.5400      15.5       152       184        95
VIS    2025250     91400   20.1300 -115.8100      10.0       140       182       100
VIS    2025250     91400   20.1100 -115.8400      10.2       141       178       100
VIS    2025250     91400   20.1100 -115.8600      10.2       146       174       100
VIS    2025250     91400   20.1000 -115.8700      10.0       148       174        99
VIS    2025250     91400   20.1100 -115.9200       9.3       157       164       100
VIS    2025250     91400   20.1100 -115.9300       9.3       157       164       100
VIS    2025250     91400   20.1000 -115.9600       8.2       152       153        96
VIS    2025250     91400   20.1000 -115.9800       8.4       152       152        98
VIS    2025250     91400   20.1200 -116.0100      10.1       157       149        99
VIS    2025250     91400   20.1000 -116.0600       8.6       152       153        99
VIS    2025250     91400   20.1100 -116.0800       8.3       165       148        99
VIS    2025250     91400   20.1000 -116.1100       8.6       168       145       100
VIS    2025250     91400   20.1100 -116.1400       8.4       171       140        97
VIS    2025250     91400   20.1100 -116.1700       7.8       178       133        96
VIS    2025250     91400   20.1100 -116.1900       8.6       182       133        92
VIS    2025250     91400   20.0900 -116.2100       8.2       187       133        99
VIS    2025250     91400   20.0900 -116.2600      10.1       189       137       100
VIS    2025250     91400   20.0900 -116.2700      10.6       189       148        99
VIS    2025250     91400   20.1100 -116.2900      10.3       188       174        98
VIS    2025250     91400   20.1000 -116.3400      11.8       191       184       100
VIS    2025250     91400   20.1100 -116.3500      13.3       191       182        91
VIS    2025250     91400   20.0800 -116.7400       8.6       173       185       100
VIS    2025250     91400   20.0800 -116.7400       8.7       172       183       100
VIS    2025250     91400   20.1000 -116.7800       7.8       179       183        99
VIS    2025250     91400   20.0900 -116.7900       6.7       180       183        94
VIS    2025250     91400   20.0800 -116.8700       7.6       204       183        95
VIS    2025250     91400   20.0800 -116.8800       7.6       205       183        95
VIS    2025250     91400   20.0600 -117.8800       9.2       116       182        97
VIS    2025250     91400   20.0400 -118.7900       4.7        27       173        94
VIS    2025250     91400   20.0400 -118.8300       5.8        35       173        91
VIS    2025250     91400   20.0300 -118.8900       6.0         9       169       100
VIS    2025250     91400   20.0300 -118.9300       7.1       359       176       100
VIS    2025250     91400   20.0300 -118.9500       6.8         0       177        93
VIS    2025250     91400   20.0200 -118.9700       5.9        11       176        92
VIS    2025250     91400   20.2700 -110.4400      11.4         5       789        96
VIS    2025250     91400   20.1500 -113.6000      10.5       164       136       100
VIS    2025250     91400   20.1500 -113.6100      10.0       162       136        99
VIS    2025250     91400   20.1400 -113.6800       8.7       166       135        97
VIS    2025250     91400   20.1400 -113.7500       8.2       166       134       100
VIS    2025250     91400   20.1600 -113.7700       8.3       166       137        99
VIS    2025250     91400   20.1500 -113.8100       7.4       172       133       100
VIS    2025250     91400   20.1400 -113.8400       6.9       170       134       100
VIS    2025250     91400   20.1500 -113.8600       6.0       167       137        99
VIS    2025250     91400   20.1500 -113.8800       5.4       165       138        99
VIS    2025250     91400   20.1600 -113.9200       7.1       166       141        91
VIS    2025250     91400   20.0900 -115.8000      10.4       141       180        98
VIS    2025250     91400   20.0800 -115.8400      11.0       144       177       100
VIS    2025250     91400   20.0800 -115.8500      10.8       144       177       100
VIS    2025250     91400   20.0800 -115.8900      10.0       150       174       100
VIS    2025250     91400   20.1000 -115.9200       9.0       156       164        99
VIS    2025250     91400   20.0900 -115.9300       8.9       154       164        99
VIS    2025250     91400   20.1000 -115.9700       8.1       152       153        97
VIS    2025250     91400   20.0900 -115.9900       8.2       152       153        99
VIS    2025250     91400   20.0900 -116.0200       9.0       153       153       100
VIS    2025250     91400   20.0900 -116.0500       9.0       150       153        96
VIS    2025250     91400   20.0700 -116.1000       8.0       162       147       100
VIS    2025250     91400   20.0700 -116.1000       8.1       164       145       100
VIS    2025250     91400   20.0900 -116.1300       8.7       168       140       100
VIS    2025250     91400   20.0900 -116.1700       7.8       173       135        99
VIS    2025250     91400   20.0900 -116.1900       7.6       182       133        98
VIS    2025250     91400   20.0700 -116.2300       8.4       190       136        95
VIS    2025250     91400   20.0700 -116.2500       9.9       191       136       100
VIS    2025250     91400   20.0900 -116.2700      10.6       189       148        99
VIS    2025250     91400   20.0800 -116.3000      10.6       189       149        99
VIS    2025250     91400   20.0600 -116.3800       5.7       212       182        92
VIS    2025250     91400   20.0500 -116.7400       8.7       171       181       100
VIS    2025250     91400   20.0600 -116.7500       8.2       172       181       100
VIS    2025250     91400   20.0700 -116.7800       6.6       178       183        98
VIS    2025250     91400   20.0600 -116.8100       5.1       183       183        91
VIS    2025250     91400   20.0500 -116.8600       8.4       197       184        98
VIS    2025250     91400   20.0400 -117.3800       4.1        93       185        95
VIS    2025250     91400   20.0000 -118.8000       6.1        37       177        93
VIS    2025250     91400   20.0100 -118.8300       6.3        42       177        95
VIS    2025250     91400   20.0000 -118.8600       6.1        33       173        98
VIS    2025250     91400   20.0000 -118.8900       6.6        16       169        99
VIS    2025250     91400   19.9900 -118.8900       6.9        15       169        99
VIS    2025250     91400   20.0000 -118.9300       7.2         6       170        99
VIS    2025250     91400   20.0000 -118.9600       6.7        11       174        96
VIS    2025250     91400   20.0100 -118.9700       5.8        12       176        95
VIS    2025250     91400   19.9900 -119.0500       7.1       358       176        98
VIS    2025250     91400   19.9900 -119.0600       7.1       358       176        98
VIS    2025250     91400   20.2400 -110.4300      10.8         6       804        95
VIS    2025250     91400   20.2400 -110.4600      10.8         8       804        94
VIS    2025250     91400   20.1200 -113.4900      12.0       152       131        90
VIS    2025250     91400   20.1300 -113.5400      11.5       153       131        95
VIS    2025250     91400   20.1400 -113.5600      11.1       156       129        98
VIS    2025250     91400   20.1200 -113.5900      11.3       158       129       100
VIS    2025250     91400   20.1300 -113.6300       9.7       161       133       100
VIS    2025250     91400   20.1300 -113.6400       9.5       161       134       100
VIS    2025250     91400   20.1400 -113.6700       8.7       166       135        98
VIS    2025250     91400   20.1300 -113.7200       7.7       171       133        96
VIS    2025250     91400   20.1400 -113.7200       7.8       171       132        98
VIS    2025250     91400   20.1300 -113.7600       7.8       168       132       100
VIS    2025250     91400   20.1200 -113.7900       7.9       168       132       100
VIS    2025250     91400   20.1300 -113.8300       7.3       170       135       100
VIS    2025250     91400   20.1300 -113.8400       6.9       169       135       100
VIS    2025250     91400   20.0600 -115.7500      10.6       139       181        97
VIS    2025250     91400   20.0700 -115.7600      10.6       142       176        98
VIS    2025250     91400   20.0500 -115.8100      10.8       138       173        99
VIS    2025250     91400   20.0700 -115.8300      11.0       143       177        99
VIS    2025250     91400   20.0700 -115.8400      11.0       143       177        99
VIS    2025250     91400   20.0600 -115.8800      10.9       149       176       100
VIS    2025250     91400   20.0700 -115.9000      10.0       150       174       100
VIS    2025250     91400   20.0600 -115.9500       8.7       148       168       100
VIS    2025250     91400   20.0500 -115.9800       7.3       150       165        98
VIS    2025250     91400   20.0500 -115.9800       7.3       150       165        99
VIS    2025250     91400   20.0500 -116.0300       9.3       156       158       100
VIS    2025250     91400   20.0600 -116.0600       8.3       157       153        99
VIS    2025250     91400   20.0600 -116.0700       8.0       158       151       100
VIS    2025250     91400   20.0700 -116.1000       8.1       165       146        98
VIS    2025250     91400   20.0500 -116.1300       9.3       170       140        99
VIS    2025250     91400   20.0600 -116.1700       8.1       170       135        99
VIS    2025250     91400   20.0400 -116.2000       7.1       179       138        99
VIS    2025250     91400   20.0600 -116.2300       8.6       189       136        93
VIS    2025250     91400   20.0600 -116.2400       8.0       187       136        99
VIS    2025250     91400   20.0600 -116.2700       9.7       191       148       100
VIS    2025250     91400   20.0400 -116.2900       8.3       192       162        97
VIS    2025250     91400   20.0400 -116.3400       7.8       213       176       100
VIS    2025250     91400   20.0400 -116.3500       7.7       213       176       100
VIS    2025250     91400   20.0400 -116.3800       6.4       199       182       100
VIS    2025250     91400   20.0300 -116.7100       8.7       167       183       100
VIS    2025250     91400   20.0300 -116.7100       8.7       168       182       100
VIS    2025250     91400   20.0300 -116.7500       7.3       172       181        98
VIS    2025250     91400   20.0500 -116.7600       7.0       173       181        99
VIS    2025250     91400   20.0400 -116.8200       4.4       188       184        97
VIS    2025250     91400   20.0300 -116.8200       4.4       188       186        93
VIS    2025250     91400   20.0500 -116.8500       6.2       172       185        99
VIS    2025250     91400   20.0000 -118.0600       4.6       350       179        97
VIS    2025250     91400   19.9900 -118.1000       4.0         4       178        99
VIS    2025250     91400   19.9900 -118.8000       6.0        36       180        95
VIS    2025250     91400   19.9800 -118.8000       5.7        38       188        97
VIS    2025250     91400   19.9700 -118.8700       6.8        28       182        99
VIS    2025250     91400   19.9800 -118.9000       7.4        14       170        99
VIS    2025250     91400   19.9800 -118.9200       7.5        13       170        99
VIS    2025250     91400   19.9800 -118.9600       7.1        11       175        99
VIS    2025250     91400   19.9700 -118.9900       7.4         5       177        99
VIS    2025250     91400   19.9700 -119.0000       7.1         6       177        98
VIS    2025250     91400   20.1100 -113.1500      11.1       135       135       100
VIS    2025250     91400   20.1200 -113.3000      11.7       145       131        98
VIS    2025250     91400   20.1200 -113.3500      10.8       139       133        94
VIS    2025250     91400   20.1000 -113.4500      12.2       151       127        96
VIS    2025250     91400   20.1200 -113.4800      12.3       151       129        96
VIS    2025250     91400   20.1000 -113.5200      11.4       156       129       100
VIS    2025250     91400   20.1000 -113.5400      11.3       155       129       100
VIS    2025250     91400   20.1000 -113.5600      11.5       155       129       100
VIS    2025250     91400   20.1200 -113.5900      11.1       159       129       100
VIS    2025250     91400   20.1200 -113.6300       9.7       162       133       100
VIS    2025250     91400   20.1100 -113.6400       9.5       162       133        99
VIS    2025250     91400   20.0900 -113.6800       8.4       167       133       100
VIS    2025250     91400   20.1100 -113.7100       8.3       173       133        95
VIS    2025250     91400   20.1000 -113.7400       8.5       173       130       100
VIS    2025250     91400   20.0900 -113.7800       8.2       172       128       100
VIS    2025250     91400   20.0900 -113.7900       8.2       172       128       100
VIS    2025250     91400   20.0900 -113.8200       8.0       170       132        99
VIS    2025250     91400   20.1100 -113.8400       7.7       173       135        97
VIS    2025250     91400   20.0900 -113.9000       6.2       169       142        90
VIS    2025250     91400   20.0900 -113.9800       7.4       161       141        91
VIS    2025250     91400   20.0800 -114.0100       8.5       188       139        93
VIS    2025250     91400   20.0800 -114.0200       8.7       188       139        95
VIS    2025250     91400   20.1000 -114.0500       8.6       194       141       100
VIS    2025250     91400   20.0900 -114.1300       8.7       185       143        98
VIS    2025250     91400   20.0800 -114.1600       9.3       193       144        92
VIS    2025250     91400   20.0900 -114.1600       8.4       192       147        97
VIS    2025250     91400   20.0300 -115.7700      10.5       134       172        99
VIS    2025250     91400   20.0500 -115.8000      10.8       138       173        99
VIS    2025250     91400   20.0500 -115.8200      11.0       138       173        99
VIS    2025250     91400   20.0400 -115.8700      11.2       146       178       100
VIS    2025250     91400   20.0300 -115.8800      10.9       146       178       100
VIS    2025250     91400   20.0400 -115.9200       9.9       148       174       100
VIS    2025250     91400   20.0400 -115.9300       9.7       147       172       100
VIS    2025250     91400   20.0200 -115.9600       9.0       148       171       100
VIS    2025250     91400   20.0400 -115.9800       7.4       150       165        99
VIS    2025250     91400   20.0400 -116.0200       9.2       155       158       100
VIS    2025250     91400   20.0400 -116.0400       9.8       158       155       100
VIS    2025250     91400   20.0200 -116.1000       8.8       167       146        98
VIS    2025250     91400   20.0200 -116.1000       8.7       168       146        98
VIS    2025250     91400   20.0400 -116.1300       9.4       172       141       100
VIS    2025250     91400   20.0300 -116.1700       9.1       183       139        99
VIS    2025250     91400   20.0400 -116.2000       7.3       179       138        99
VIS    2025250     91400   20.0400 -116.2100       7.2       178       142        99
VIS    2025250     91400   20.0200 -116.2600       9.0       184       158        98
VIS    2025250     91400   20.0300 -116.2900       8.1       190       168        99
VIS    2025250     91400   20.0400 -116.2900       8.1       192       168        97
VIS    2025250     91400   20.0200 -116.3500       7.7       211       176       100
VIS    2025250     91400   20.0200 -116.3700       7.4       203       183       100
VIS    2025250     91400   20.0100 -116.7100       7.8       168       185        98
VIS    2025250     91400   20.0000 -116.7200       7.3       169       182        97
VIS    2025250     91400   20.0100 -116.7400       7.1       170       182        91
VIS    2025250     91400   20.0200 -116.7700       6.1       175       182        95
VIS    2025250     91400   19.9700 -118.1000       4.0         7       167        99
VIS    2025250     91400   19.9700 -118.8000       5.5        39       185        96
VIS    2025250     91400   19.9700 -118.8200       5.9        41       188        98
VIS    2025250     91400   19.9700 -118.8400       6.5        35       188       100
VIS    2025250     91400   19.9500 -118.8800       6.9        20       182        98
VIS    2025250     91400   19.9600 -118.8900       6.8        19       182        96
VIS    2025250     91400   19.9500 -118.9200       7.0        23       172        97
VIS    2025250     91400   19.9500 -118.9700       7.2         9       176       100
VIS    2025250     91400   19.9600 -118.9900       7.6         4       177       100
VIS    2025250     91400   19.9600 -119.0000       7.6         4       177       100
VIS    2025250     91400   20.1000 -112.6100       8.3       135       147       100
VIS    2025250     91400   20.1100 -112.6400       8.6       136       145        96
VIS    2025250     91400   20.1000 -112.6600       7.9       132       146       100
VIS    2025250     91400   20.1000 -112.9400      10.7       139       133       100
VIS    2025250     91400   20.0900 -112.9500      10.2       137       133       100
VIS    2025250     91400   20.1000 -112.9900      10.9       138       145        90
VIS    2025250     91400   20.1000 -113.0800      12.2       133       131       100
VIS    2025250     91400   20.0900 -113.0900      12.1       134       131       100
VIS    2025250     91400   20.1100 -113.1400      11.2       135       133       100
VIS    2025250     91400   20.1000 -113.1700      11.2       134       135       100
VIS    2025250     91400   20.1000 -113.2000      11.6       132       137        99
VIS    2025250     91400   20.0900 -113.2200      11.6       136       134        96
VIS    2025250     91400   20.0800 -113.2600      11.1       142       129        98
VIS    2025250     91400   20.0800 -113.2800      10.6       142       129        97
VIS    2025250     91400   20.0800 -113.3900      14.1       129       128        95
VIS    2025250     91400   20.0800 -113.4500      12.5       151       126        99
VIS    2025250     91400   20.0900 -113.4900      12.5       153       127        98
VIS    2025250     91400   20.0900 -113.5200      11.3       156       128       100
VIS    2025250     91400   20.0900 -113.5500      11.3       155       129       100
VIS    2025250     91400   20.0900 -113.5600      11.3       155       128       100
VIS    2025250     91400   20.0900 -113.5900      11.5       154       129       100
VIS    2025250     91400   20.0700 -113.6500       9.6       173       126        94
VIS    2025250     91400   20.0700 -113.6900       8.4       166       124        99
VIS    2025250     91400   20.0700 -113.7100       8.2       167       128       100
VIS    2025250     91400   20.0700 -113.7400       8.3       166       128       100
VIS    2025250     91400   20.0700 -113.7800       9.2       170       125       100
VIS    2025250     91400   20.0600 -113.8000       9.2       173       125        99
VIS    2025250     91400   20.0600 -113.8200       8.9       173       125        94
VIS    2025250     91400   20.0600 -113.8700       8.6       180       125        98
VIS    2025250     91400   20.0800 -113.9000       6.4       171       142        95
VIS    2025250     91400   20.0700 -113.9300       6.8       164       138        99
VIS    2025250     91400   20.0800 -113.9400       6.4       164       142        98
VIS    2025250     91400   20.0600 -113.9700       7.9       165       133        94
VIS    2025250     91400   20.0600 -114.0200       9.7       191       131       100
VIS    2025250     91400   20.0700 -114.0300       9.5       190       136       100
VIS    2025250     91400   20.0600 -114.0700      10.7       191       132        91
VIS    2025250     91400   20.0700 -114.1000      10.9       190       131        98
VIS    2025250     91400   20.0600 -114.1300      10.3       190       131        98
VIS    2025250     91400   20.0600 -114.2000       9.0       196       147        96
VIS    2025250     91400   20.0600 -114.2600       8.3       196       150        97
VIS    2025250     91400   20.0200 -115.7600      10.4       137       172       100
VIS    2025250     91400   20.0100 -115.7700      10.2       138       172       100
VIS    2025250     91400   20.0000 -115.8000       9.8       143       169       100
VIS    2025250     91400   20.0200 -115.8300      10.6       143       172        96
VIS    2025250     91400   20.0100 -115.8600      10.3       146       175        98
VIS    2025250     91400   20.0200 -115.8900      10.4       146       176       100
VIS    2025250     91400   20.0100 -115.9300       9.7       148       173       100
VIS    2025250     91400   20.0200 -115.9300       9.7       147       173       100
VIS    2025250     91400   20.0100 -115.9700       9.1       150       166       100
VIS    2025250     91400   20.0200 -116.0000       9.1       153       162       100
VIS    2025250     91400   20.0000 -116.0200       9.8       154       159       100
VIS    2025250     91400   20.0000 -116.0700      10.0       160       148        96
VIS    2025250     91400   20.0000 -116.0800       9.6       160       148        98
VIS    2025250     91400   20.0200 -116.1200       9.3       174       143       100
VIS    2025250     91400   19.9900 -116.1300       9.0       173       143       100
VIS    2025250     91400   19.9900 -116.1700       9.2       180       143       100
VIS    2025250     91400   20.0000 -116.1900       8.9       179       144       100
VIS    2025250     91400   20.0100 -116.2100       8.3       177       145       100
VIS    2025250     91400   20.0100 -116.2600       9.3       183       158        97
VIS    2025250     91400   19.9900 -116.2800       9.9       187       174        97
VIS    2025250     91400   20.0000 -116.3200       7.2       203       176        98
VIS    2025250     91400   19.9900 -116.3500       7.1       203       181       100
VIS    2025250     91400   19.9900 -116.3600       7.2       202       182       100
VIS    2025250     91400   19.9800 -116.5000      10.9       173       182        90
VIS    2025250     91400   19.9900 -116.5300      11.4       167       177        90
VIS    2025250     91400   20.0000 -116.7200       7.0       169       182        98
VIS    2025250     91400   19.9900 -116.7500       6.7       171       183        91
VIS    2025250     91400   19.9900 -116.9500       8.6       197       185       100
VIS    2025250     91400   19.9300 -118.5800       4.2       325       164        94
VIS    2025250     91400   19.9300 -118.6000       4.5       330       166        99
VIS    2025250     91400   19.9400 -118.9400       6.9        15       175       100
VIS    2025250     91400   19.9300 -118.9600       7.4        11       176       100
VIS    2025250     91400   19.9300 -119.0000       7.7         9       176       100
VIS    2025250     91400   19.9300 -119.0100       7.5        12       176       100
VIS    2025250     91400   20.1600 -110.0200       5.5        56       167        98
VIS    2025250     91400   20.1700 -110.0600       4.9        60       171        97
VIS    2025250     91400   20.0900 -112.2400       6.2       125       142       100
VIS    2025250     91400   20.0900 -112.2700       6.7       127       142        99
VIS    2025250     91400   20.0900 -112.2900       6.8       128       142       100
VIS    2025250     91400   20.1000 -112.6000       8.7       136       147        95
VIS    2025250     91400   20.1000 -112.6100       8.3       134       147       100
VIS    2025250     91400   20.0700 -112.9200      11.0       132       136        99
VIS    2025250     91400   20.0900 -112.9500      10.2       134       132       100
VIS    2025250     91400   20.0900 -112.9700       9.7       132       131       100
VIS    2025250     91400   20.0600 -113.0100       9.8       121       129        99
VIS    2025250     91400   20.0700 -113.0200       9.6       120       129        99
VIS    2025250     91400   20.0800 -113.0700      11.3       129       131        99
VIS    2025250     91400   20.0800 -113.0900      11.6       133       131       100
VIS    2025250     91400   20.0700 -113.1200      11.9       135       131        97
VIS    2025250     91400   20.0800 -113.1400      11.1       134       133        98
VIS    2025250     91400   20.0800 -113.2500      10.5       140       128       100
VIS    2025250     91400   20.0700 -113.2900      10.2       137       128        96
VIS    2025250     91400   20.0500 -113.3800      11.6       136       123        92
VIS    2025250     91400   20.0700 -113.4200      11.3       144       123        98
VIS    2025250     91400   20.0600 -113.4500      12.3       151       124        99
VIS    2025250     91400   20.0500 -113.4600      12.8       151       122       100
VIS    2025250     91400   20.0600 -113.5100      11.5       154       125        97
VIS    2025250     91400   20.0700 -113.5300      10.7       156       126        98
VIS    2025250     91400   20.0700 -113.5600      10.3       160       125       100
VIS    2025250     91400   20.0600 -113.6100       9.0       168       125        90
VIS    2025250     91400   20.0400 -113.6800       9.0       161       122        97
VIS    2025250     91400   20.0500 -113.6900       8.6       164       123        98
VIS    2025250     91400   20.0400 -113.7500       9.5       167       114        96
VIS    2025250     91400   20.0400 -113.7600       9.6       167       115        98
VIS    2025250     91400   20.0600 -113.7800       9.3       166       119       100
VIS    2025250     91400   20.0500 -113.8900       8.5       180       122       100
VIS    2025250     91400   20.0400 -113.9000       8.0       181       125        99
VIS    2025250     91400   20.0600 -113.9400       7.4       165       135       100
VIS    2025250     91400   20.0500 -113.9600       7.7       165       128        98
VIS    2025250     91400   20.0300 -114.0400      10.4       191       129        98
VIS    2025250     91400   20.0300 -114.0400      10.1       190       129        99
VIS    2025250     91400   20.0300 -114.0800      10.6       192       129        97
VIS    2025250     91400   20.0500 -114.1200      10.9       190       131       100
VIS    2025250     91400   20.0500 -114.1300      10.4       191       131        97
VIS    2025250     91400   20.0300 -114.1600       8.9       198       130        95
VIS    2025250     91400   20.0500 -114.1900       8.9       196       144        95
VIS    2025250     91400   20.0300 -114.2200       8.9       202       142        99
VIS    2025250     91400   20.0500 -114.2600       8.7       197       149        92
VIS    2025250     91400   19.9800 -115.6500      10.1       144       181       100
VIS    2025250     91400   19.9900 -115.6700       9.9       142       183       100
VIS    2025250     91400   19.9800 -115.7200      11.2       146       178       100
VIS    2025250     91400   19.9900 -115.7300      11.1       144       179       100
VIS    2025250     91400   20.0000 -115.7700       9.8       139       169        99
VIS    2025250     91400   19.9900 -115.8100       8.3       144       168        95
VIS    2025250     91400   19.9800 -115.8100       8.3       145       165        97
VIS    2025250     91400   19.9900 -115.8600       9.5       147       173        99
VIS    2025250     91400   19.9900 -115.8700       9.3       148       168       100
VIS    2025250     91400   19.9800 -115.9200       9.1       150       166       100
VIS    2025250     91400   19.9800 -115.9500       9.4       148       160       100
VIS    2025250     91400   19.9900 -115.9700       9.5       150       160       100
VIS    2025250     91400   19.9900 -115.9800       9.7       149       160       100
VIS    2025250     91400   19.9900 -116.0200       9.9       153       159       100
VIS    2025250     91400   19.9800 -116.0500      10.0       156       153       100
VIS    2025250     91400   19.9800 -116.0900       9.0       163       146       100
VIS    2025250     91400   19.9700 -116.1100       8.4       165       145       100
VIS    2025250     91400   19.9700 -116.1400       8.2       170       143       100
VIS    2025250     91400   19.9800 -116.1500       8.3       173       143        99
VIS    2025250     91400   19.9700 -116.2000       8.1       174       145        99
VIS    2025250     91400   19.9700 -116.2200       8.1       175       145        98
VIS    2025250     91400   19.9700 -116.2600      10.4       187       158       100
VIS    2025250     91400   19.9700 -116.2800      10.4       188       174       100
VIS    2025250     91400   19.9800 -116.3100       8.3       196       178       100
VIS    2025250     91400   19.9600 -116.3200       7.4       199       180       100
VIS    2025250     91400   19.9800 -116.3400       7.2       203       181       100
VIS    2025250     91400   19.9800 -116.5600      11.5       171       184        93
VIS    2025250     91400   19.9500 -116.6800       5.5       181       170        97
VIS    2025250     91400   19.9500 -116.7300       6.8       172       176       100
VIS    2025250     91400   19.9700 -116.7400       6.6       171       180        98
VIS    2025250     91400   19.9600 -116.7600       6.0       172       182        95
VIS    2025250     91400   19.9300 -117.7400       8.1       161       172        99
VIS    2025250     91400   19.9300 -117.7600       8.3       170       176        96
VIS    2025250     91400   19.9200 -118.1500       5.4        83       147        96
VIS    2025250     91400   19.9200 -118.5400       4.3       322       161        97
VIS    2025250     91400   19.9100 -118.5700       4.5       318       163        98
VIS    2025250     91400   19.9000 -118.5800       4.4       319       164        99
VIS    2025250     91400   19.9000 -118.6200       4.9       346       167        96
VIS    2025250     91400   19.9000 -118.7200      11.3       351       182        98
VIS    2025250     91400   19.9000 -118.7400      10.3       353       186        94
VIS    2025250     91400   19.9000 -118.7600       7.5         9       189        95
VIS    2025250     91400   19.9000 -118.7900       7.4         2       184        97
VIS    2025250     91400   19.9100 -118.8300       6.1        28       188        93
VIS    2025250     91400   19.8900 -118.8600       5.8        26       184        90
VIS    2025250     91400   19.9100 -118.8900       6.4        21       184        92
VIS    2025250     91400   19.9100 -118.9600       6.9        20       177        96
VIS    2025250     91400   19.9000 -118.9800       7.2        22       180        99
VIS    2025250     91400   19.9100 -118.9900       7.2        19       176       100
VIS    2025250     91400   19.9000 -119.0300       7.3        17       180        99
VIS    2025250     91400   19.9000 -119.0500       7.3        15       180        97
VIS    2025250     91400   20.2000 -108.7400       4.6        83       190        97
VIS    2025250     91400   20.1400 -109.9500       4.2        71       161        98
VIS    2025250     91400   20.1500 -109.9600       4.5        68       161        99
VIS    2025250     91400   20.1400 -110.0000       5.7        67       165        99
VIS    2025250     91400   20.0700 -112.2900       6.8       124       141        97
VIS    2025250     91400   20.0700 -112.2900       6.7       125       141        99
VIS    2025250     91400   20.0800 -112.3400       6.8       124       146        95
VIS    2025250     91400   20.0600 -112.3600       6.6       121       146        93
VIS    2025250     91400   20.0500 -112.8700      11.0       135       131        91
VIS    2025250     91400   20.0600 -112.9300      10.0       126       133       100
VIS    2025250     91400   20.0500 -112.9400       9.6       124       132        99
VIS    2025250     91400   20.0400 -112.9800       9.4       120       128        90
VIS    2025250     91400   20.0600 -113.0100       9.7       122       129        99
VIS    2025250     91400   20.0500 -113.0300       9.5       122       127        99
VIS    2025250     91400   20.0500 -113.0600      10.8       126       129       100
VIS    2025250     91400   20.0500 -113.1000      12.1       130       130        97
VIS    2025250     91400   20.0400 -113.1300      11.5       132       127        91
VIS    2025250     91400   20.0300 -113.1800       9.9       134       124       100
VIS    2025250     91400   20.0300 -113.2100       9.4       134       123        99
VIS    2025250     91400   20.0300 -113.2500       9.7       137       123        94
VIS    2025250     91400   20.0400 -113.2800      10.4       139       126        92
VIS    2025250     91400   20.0500 -113.3100      10.2       139       127        97
VIS    2025250     91400   20.0300 -113.3300      10.1       142       127        99
VIS    2025250     91400   20.0300 -113.3800      10.6       136       123        98
VIS    2025250     91400   20.0500 -113.3900      11.6       136       123        91
VIS    2025250     91400   20.0400 -113.4300      12.3       148       122        95
VIS    2025250     91400   20.0400 -113.4600      12.9       151       122       100
VIS    2025250     91400   20.0200 -113.4700      13.5       151       119       100
VIS    2025250     91400   20.0400 -113.5100      13.9       147       122        96
VIS    2025250     91400   20.0400 -113.5700       9.0       171       124        98
VIS    2025250     91400   20.0300 -113.6600       8.6       153       116        99
VIS    2025250     91400   20.0200 -113.6800       9.1       148       112        99
VIS    2025250     91400   20.0200 -113.7300      11.5       187       112       100
VIS    2025250     91400   20.0400 -113.7500       9.8       169       114        98
VIS    2025250     91400   20.0300 -113.7900       9.5       165       115        99
VIS    2025250     91400   20.0200 -113.8400       8.6       172       116        94
VIS    2025250     91400   20.0300 -113.8700       8.0       177       120        98
VIS    2025250     91400   20.0200 -113.9000       7.4       185       120       100
VIS    2025250     91400   20.0300 -113.9000       7.7       184       122       100
VIS    2025250     91400   20.0100 -113.9300       7.6       180       122        99
VIS    2025250     91400   20.0100 -113.9800       9.1       181       124        98
VIS    2025250     91400   20.0100 -114.0400       9.6       188       122        99
VIS    2025250     91400   20.0300 -114.0600      10.3       191       128        97
VIS    2025250     91400   20.0100 -114.0900      10.4       194       126       100
VIS    2025250     91400   20.0100 -114.1100      10.2       196       126       100
VIS    2025250     91400   20.0200 -114.1400       9.2       202       129        96
VIS    2025250     91400   20.0100 -114.1700       8.0       203       129        99
VIS    2025250     91400   20.0100 -114.2100       8.1       205       136        98
VIS    2025250     91400   20.0000 -114.2400       8.6       216       136        97
VIS    2025250     91400   20.0000 -114.2600       9.9       223       136       100
VIS    2025250     91400   20.0000 -114.3300       7.8       209       145        93
VIS    2025250     91400   19.9600 -115.6100      11.2       143       184        99
VIS    2025250     91400   19.9600 -115.6200      10.5       144       184       100
VIS    2025250     91400   19.9600 -115.6700      10.9       147       174        99
VIS    2025250     91400   19.9600 -115.6800      10.9       147       174        99
VIS    2025250     91400   19.9800 -115.7200      11.3       147       178       100
VIS    2025250     91400   19.9500 -115.7600       9.2       147       169        97
VIS    2025250     91400   19.9700 -115.8100       8.4       148       165        90
VIS    2025250     91400   19.9600 -115.8600       8.7       144       163        98
VIS    2025250     91400   19.9700 -115.8800       8.9       147       166       100
VIS    2025250     91400   19.9700 -115.9200       9.1       150       165       100
VIS    2025250     91400   19.9500 -115.9400       9.4       148       157       100
VIS    2025250     91400   19.9500 -115.9800       9.5       147       153       100
VIS    2025250     91400   19.9500 -116.0100       9.5       153       148       100
VIS    2025250     91400   19.9600 -116.0200       9.6       154       153       100
VIS    2025250     91400   19.9700 -116.0500       9.3       157       153       100
VIS    2025250     91400   19.9700 -116.0900       8.6       163       146       100
VIS    2025250     91400   19.9400 -116.1200       8.2       168       143       100
VIS    2025250     91400   19.9600 -116.1400       7.9       169       143       100
VIS    2025250     91400   19.9600 -116.1600       7.8       170       143       100
VIS    2025250     91400   19.9500 -116.1900       7.5       171       143       100
VIS    2025250     91400   19.9500 -116.2200       7.6       175       145       100
VIS    2025250     91400   19.9400 -116.2500       7.7       183       155       100
VIS    2025250     91400   19.9600 -116.2800      10.3       188       174        99
VIS    2025250     91400   19.9400 -116.3200       6.7       197       182        96
VIS    2025250     91400   19.9600 -116.3300       7.2       199       181       100
VIS    2025250     91400   19.9400 -116.6800       5.2       180       169        98
VIS    2025250     91400   19.9500 -116.6800       5.5       180       170        97
VIS    2025250     91400   19.9500 -116.7300       6.9       172       175       100
VIS    2025250     91400   19.9300 -116.7600       5.6       180       175        95
VIS    2025250     91400   19.9400 -116.7700       5.2       183       181        90
VIS    2025250     91400   19.9300 -116.8000       4.4       191       184        94
VIS    2025250     91400   19.9000 -117.6700       4.8       140       160        94
VIS    2025250     91400   19.9100 -117.7600       8.2       167       171        94
VIS    2025250     91400   19.9100 -117.9200       4.1       108       151        98
VIS    2025250     91400   19.9000 -118.1700       4.9        83       146        92
VIS    2025250     91400   19.8900 -118.1900       4.2        87       140        97
VIS    2025250     91400   19.8900 -118.2300       5.4        93       145        90
VIS    2025250     91400   19.9000 -118.3100       5.8       100       150        98
VIS    2025250     91400   19.8900 -118.3400       4.4        94       150       100
VIS    2025250     91400   19.8900 -118.3400       4.0        94       150       100
VIS    2025250     91400   19.9000 -118.5100       4.3       336       161       100
VIS    2025250     91400   19.8800 -118.5500       4.8       326       161        99
VIS    2025250     91400   19.8800 -118.5600       4.8       321       161        96
VIS    2025250     91400   19.8900 -118.5900       4.5       319       164        95
VIS    2025250     91400   19.8800 -118.6200       4.6       347       165        99
VIS    2025250     91400   19.8800 -118.6400       5.0       359       169        98
VIS    2025250     91400   19.8900 -118.7700       8.8       359       185        97
VIS    2025250     91400   19.8800 -118.7900       8.8         1       182        95
VIS    2025250     91400   19.8800 -118.8900       7.5        10       179       100
VIS    2025250     91400   19.8900 -118.9600       7.1        22       181        99
VIS    2025250     91400   19.8700 -118.9900       7.1        22       182       100
VIS    2025250     91400   19.8700 -119.0000       7.0        22       181        99
VIS    2025250     91400   19.8900 -119.0300       7.7        15       180       100
VIS    2025250     91400   19.8600 -119.0700       9.1         8       180        99
VIS    2025250     91400   20.1600 -108.7100       4.4        79       187        95
VIS    2025250     91400   20.1800 -108.7200       4.4        82       190        97
VIS    2025250     91400   20.1200 -109.8500       8.8        61       154       100
VIS    2025250     91400   20.1300 -109.8700       9.1        55       152        98
VIS    2025250     91400   20.1300 -109.9500       4.0        78       158        99
VIS    2025250     91400   20.1200 -109.9800       4.7        68       162        93
VIS    2025250     91400   20.0500 -112.2500       6.0       116       142        96
VIS    2025250     91400   20.0600 -112.3000       7.0       125       140        99
VIS    2025250     91400   20.0400 -112.3300       6.7       124       143        95
VIS    2025250     91400   20.0500 -112.3500       6.6       122       146        94
VIS    2025250     91400   20.0400 -112.3800       5.8       119       147        99
VIS    2025250     91400   20.0300 -112.8900      10.1       131       133        96
VIS    2025250     91400   20.0300 -112.9100       9.6       127       133        98
VIS    2025250     91400   20.0300 -112.9300       9.0       124       133        99
VIS    2025250     91400   20.0100 -113.0000       9.8       123       127        95
VIS    2025250     91400   20.0200 -113.0200      10.7       125       127        98
VIS    2025250     91400   20.0300 -113.0500      11.0       128       126       100
VIS    2025250     91400   20.0300 -113.0800      11.8       128       127        99
VIS    2025250     91400   20.0200 -113.1200      11.7       130       127        94
VIS    2025250     91400   20.0300 -113.1800       9.9       134       124       100
VIS    2025250     91400   20.0100 -113.2100       9.6       132       122        99
VIS    2025250     91400   20.0100 -113.2300       9.1       127       121        92
VIS    2025250     91400   20.0000 -113.2800      11.4       132       121        91
VIS    2025250     91400   20.0200 -113.3400      10.2       143       124       100
VIS    2025250     91400   20.0000 -113.4200      12.7       147       119        92
VIS    2025250     91400   20.0100 -113.4300      12.9       148       119        91
VIS    2025250     91400   20.0200 -113.4600      13.4       151       119       100
VIS    2025250     91400   20.0100 -113.4800      13.8       151       119       100
VIS    2025250     91400   20.0000 -113.5600       8.3       165       117        90
VIS    2025250     91400   19.9900 -113.6300      10.0       159       111       100
VIS    2025250     91400   20.0100 -113.6300       9.2       160       116        97
VIS    2025250     91400   20.0000 -113.6800       9.2       146       110        97
VIS    2025250     91400   20.0100 -113.6900       9.2       147       112       100
VIS    2025250     91400   20.0100 -113.7400      11.6       187       111       100
VIS    2025250     91400   19.9900 -113.8000       8.5       168       112        97
VIS    2025250     91400   19.9900 -113.8200       8.5       162       113        92
VIS    2025250     91400   20.0100 -113.8500       8.0       169       116        99
VIS    2025250     91400   20.0000 -113.8800       6.8       184       117       100
VIS    2025250     91400   20.0000 -113.9100       6.6       193       119        98
VIS    2025250     91400   20.0000 -113.9300       7.2       184       122        99
VIS    2025250     91400   19.9900 -113.9600       8.9       181       120       100
VIS    2025250     91400   19.9800 -114.0000       9.1       189       117        99
VIS    2025250     91400   20.0000 -114.0300       9.2       188       121       100
VIS    2025250     91400   19.9800 -114.0400       8.8       190       119       100
VIS    2025250     91400   19.9900 -114.0800       9.8       194       122        99
VIS    2025250     91400   19.9900 -114.1000      10.0       197       125       100
VIS    2025250     91400   19.9900 -114.2000       7.6       202       129        99
VIS    2025250     91400   20.0000 -114.2200       8.1       204       130        97
VIS    2025250     91400   19.9700 -114.2600       9.3       222       135       100
VIS    2025250     91400   19.9700 -114.2900       9.6       225       135       100
VIS    2025250     91400   19.9700 -114.3000       9.4       225       135       100
VIS    2025250     91400   19.9700 -114.3400       8.4       217       135        99
VIS    2025250     91400   19.9700 -114.4100       8.4       205       149        99
VIS    2025250     91400   19.9500 -115.6100      11.1       143       184        99
VIS    2025250     91400   19.9400 -115.6400      10.3       142       176       100
VIS    2025250     91400   19.9500 -115.6700      10.9       147       173        99
VIS    2025250     91400   19.9500 -115.7000      10.6       148       174        99
VIS    2025250     91400   19.9500 -115.7200      10.8       149       174       100
VIS    2025250     91400   19.9300 -115.7700       8.7       143       165       100
VIS    2025250     91400   19.9300 -115.8300       7.8       141       158        91
VIS    2025250     91400   19.9300 -115.8700      10.0       148       156        99
VIS    2025250     91400   19.9500 -115.9100       9.3       149       158       100
VIS    2025250     91400   19.9400 -115.9400       9.5       148       157       100
VIS    2025250     91400   19.9400 -115.9400       9.6       148       156       100
VIS    2025250     91400   19.9400 -115.9900       8.8       148       146        98
VIS    2025250     91400   19.9200 -116.0300       7.9       154       147        96
VIS    2025250     91400   19.9300 -116.0300       8.7       157       147        97
VIS    2025250     91400   19.9400 -116.0700       8.7       161       146        99
VIS    2025250     91400   19.9300 -116.1100       7.6       165       143        99
VIS    2025250     91400   19.9400 -116.1100       8.1       168       143        99
VIS    2025250     91400   19.9200 -116.1500       7.0       172       141       100
VIS    2025250     91400   19.9200 -116.1800       7.2       171       143       100
VIS    2025250     91400   19.9300 -116.2000       7.3       173       143       100
VIS    2025250     91400   19.9200 -116.2300       7.2       181       148        99
VIS    2025250     91400   19.9300 -116.2700       7.6       182       160        97
VIS    2025250     91400   19.9200 -116.2900       7.6       177       171        96
VIS    2025250     91400   19.9300 -116.4900       5.0       131       182        99
VIS    2025250     91400   19.9100 -116.6200       5.3       166       167       100
VIS    2025250     91400   19.9000 -116.6600       5.6       163       162        98
VIS    2025250     91400   19.9100 -116.6900       5.8       170       162       100
VIS    2025250     91400   19.9200 -116.7000       6.2       174       167       100
VIS    2025250     91400   19.9200 -116.7500       5.8       177       172        97
VIS    2025250     91400   19.9200 -116.7600       5.4       181       174        95
VIS    2025250     91400   19.9100 -116.8100       4.7       197       182        99
VIS    2025250     91400   19.8800 -117.6800       5.2       128       159        97
VIS    2025250     91400   19.8900 -117.7400       5.7       155       166        90
VIS    2025250     91400   19.8900 -117.7600       4.7       151       168        96
VIS    2025250     91400   19.8700 -118.0400       5.2       118       142       100
VIS    2025250     91400   19.8700 -118.0700       5.7       126       143       100
VIS    2025250     91400   19.8700 -118.0800       5.3       126       147       100
VIS    2025250     91400   19.8800 -118.1100       6.1       132       148        97
VIS    2025250     91400   19.8800 -118.2000       4.6        92       140        99
VIS    2025250     91400   19.8800 -118.2200       5.3        96       140        91
VIS    2025250     91400   19.8700 -118.2500       5.7        93       141        98
VIS    2025250     91400   19.8700 -118.2800       6.5        95       141        97
VIS    2025250     91400   19.8700 -118.3100       7.0        95       147        96
VIS    2025250     91400   19.8600 -118.3400       5.8        82       147        93
VIS    2025250     91400   19.8700 -118.5300       4.3       337       161       100
VIS    2025250     91400   19.8600 -118.5700       4.9       328       161        94
VIS    2025250     91400   19.8600 -118.5800       4.9       328       161        94
VIS    2025250     91400   19.8600 -118.9100       8.0        18       177        96
VIS    2025250     91400   19.8600 -118.9300       7.7        24       177        97
VIS    2025250     91400   19.8500 -118.9800       7.6        23       182       100
VIS    2025250     91400   19.8500 -119.0000       7.2        23       182       100
VIS    2025250     91400   19.8600 -119.0100       7.0        22       181        99
VIS    2025250     91400   19.8500 -119.0600       9.6         7       179       100
VIS    2025250     91400   19.8400 -119.0900       7.7         8       178        98
VIS    2025250     91400   20.1500 -108.7000       4.3        78       186        93
VIS    2025250     91400   20.1500 -108.7300       4.1        75       186        95
VIS    2025250     91400   20.1000 -109.8400       8.5        64       156       100
VIS    2025250     91400   20.1100 -109.8400       8.6        64       156       100
VIS    2025250     91400   20.1100 -109.9400       4.5        92       154        93
VIS    2025250     91400   20.0200 -112.3300       6.1       124       143        90
VIS    2025250     91400   20.0300 -112.3400       6.3       123       143        95
VIS    2025250     91400   19.9900 -112.8300      10.5       125       136        94
VIS    2025250     91400   20.0100 -112.8700      10.3       136       135        91
VIS    2025250     91400   19.9900 -112.8800       9.5       131       135        94
VIS    2025250     91400   20.0100 -112.9100       8.8       126       133        99
VIS    2025250     91400   20.0100 -112.9300       8.2       124       133        98
VIS    2025250     91400   19.9900 -112.9600       8.0       124       127        98
VIS    2025250     91400   19.9900 -112.9900       9.7       124       127        99
VIS    2025250     91400   20.0000 -113.0300      11.5       124       127       100
VIS    2025250     91400   19.9900 -113.0600      11.4       127       124        99
VIS    2025250     91400   19.9900 -113.0800      11.5       127       125        99
VIS    2025250     91400   19.9800 -113.1100      11.5       128       125       100
VIS    2025250     91400   19.9800 -113.1600      10.9       115       123        98
VIS    2025250     91400   20.0000 -113.1700      10.0       129       123        99
VIS    2025250     91400   19.9900 -113.2200       9.6       133       122        98
VIS    2025250     91400   20.0000 -113.2300       9.5       131       121        99
VIS    2025250     91400   19.9900 -113.2800      11.6       131       120        95
VIS    2025250     91400   19.9800 -113.2900      12.1       135       120        94
VIS    2025250     91400   19.9900 -113.4500      13.2       148       119        94
VIS    2025250     91400   19.9900 -113.4800      13.9       149       117        99
VIS    2025250     91400   19.9700 -113.5000       8.4       160       113        98
VIS    2025250     91400   19.9900 -113.5300       8.4       162       117        94
VIS    2025250     91400   19.9800 -113.5500       8.4       165       115        95
VIS    2025250     91400   19.9700 -113.6000      10.2       169       110       100
VIS    2025250     91400   19.9800 -113.6100      10.5       167       110        99
VIS    2025250     91400   19.9700 -113.6600       9.7       143       108        96
VIS    2025250     91400   19.9700 -113.6700       9.6       143       108        95
VIS    2025250     91400   19.9700 -113.8100       9.1       169       112        98
VIS    2025250     91400   19.9600 -113.8500       9.1       171       113       100
VIS    2025250     91400   19.9800 -113.8600       7.5       171       114        97
VIS    2025250     91400   19.9600 -113.9200       7.5       189       116        97
VIS    2025250     91400   19.9600 -113.9500       8.9       188       116        98
VIS    2025250     91400   19.9600 -113.9600       9.2       187       116        96
VIS    2025250     91400   19.9800 -113.9900       9.2       190       116        99
VIS    2025250     91400   19.9600 -114.0400       8.6       194       116        99
VIS    2025250     91400   19.9800 -114.0400       8.7       191       117       100
VIS    2025250     91400   19.9700 -114.0800       9.6       195       121        98
VIS    2025250     91400   19.9600 -114.1800       7.8       199       120       100
VIS    2025250     91400   19.9600 -114.2600       9.5       220       132       100
VIS    2025250     91400   19.9600 -114.2700       9.6       219       132        99
VIS    2025250     91400   19.9500 -114.3200       9.0       222       132       100
VIS    2025250     91400   19.9500 -114.3300       8.8       220       132       100
VIS    2025250     91400   19.9500 -114.3600       8.5       210       133       100
VIS    2025250     91400   19.9600 -114.4200       8.7       197       147       100
VIS    2025250     91400   19.9400 -114.5000       5.5       217       152        93
VIS    2025250     91400   19.9100 -115.6100      11.6       146       181       100
VIS    2025250     91400   19.9300 -115.6500      10.4       145       175       100
VIS    2025250     91400   19.9300 -115.6700      10.4       147       174       100
VIS    2025250     91400   19.9200 -115.7000      10.1       147       173       100
VIS    2025250     91400   19.9200 -115.7300       9.9       145       171       100
VIS    2025250     91400   19.9100 -115.7600       9.2       142       162        99
VIS    2025250     91400   19.9200 -115.8000       7.4       138       158        91
VIS    2025250     91400   19.9000 -115.8100       8.4       140       156       100
VIS    2025250     91400   19.9000 -115.8500       9.5       146       154       100
VIS    2025250     91400   19.9000 -115.8800      10.3       149       152       100
VIS    2025250     91400   19.9200 -115.9000       9.9       149       156       100
VIS    2025250     91400   19.9200 -115.9300       9.7       149       152       100
VIS    2025250     91400   19.9000 -115.9700       9.5       149       145       100
VIS    2025250     91400   19.9000 -116.0000       8.1       148       142        94
VIS    2025250     91400   19.9100 -116.0200       6.2       140       142       100
VIS    2025250     91400   19.9000 -116.0600       6.6       148       147       100
VIS    2025250     91400   19.9000 -116.0600       6.5       147       145        95
VIS    2025250     91400   19.9000 -116.0900       6.7       154       143        98
VIS    2025250     91400   19.9000 -116.1400       6.0       169       140       100
VIS    2025250     91400   19.9100 -116.1500       6.5       171       140       100
VIS    2025250     91400   19.9000 -116.1700       7.0       170       143        99
VIS    2025250     91400   19.9100 -116.2200       7.3       176       146        99
VIS    2025250     91400   19.9100 -116.2300       7.3       180       146        98
VIS    2025250     91400   19.8900 -116.2600       7.7       182       161        98
VIS    2025250     91400   19.9000 -116.2900       7.8       180       168       100
VIS    2025250     91400   19.8900 -116.3200       7.8       184       172       100
VIS    2025250     91400   19.9000 -116.4900       4.9       132       182       100
VIS    2025250     91400   19.8800 -116.5600       4.4       167       176        95
VIS    2025250     91400   19.8800 -116.6100       4.8       156       167        92
VIS    2025250     91400   19.8800 -116.6500       5.3       158       162       100
VIS    2025250     91400   19.8800 -116.6500       5.6       160       160       100
VIS    2025250     91400   19.9000 -116.6900       5.9       169       162       100
VIS    2025250     91400   19.8800 -116.7200       5.3       177       164        99
VIS    2025250     91400   19.8800 -116.7400       5.0       182       165        98
VIS    2025250     91400   19.8900 -116.7600       4.4       186       169        97
VIS    2025250     91400   19.8800 -116.8100       5.7       197       176        99
VIS    2025250     91400   19.8700 -116.8200       6.2       199       176        98
VIS    2025250     91400   19.8800 -116.8600       6.1       203       177       100
VIS    2025250     91400   19.8700 -116.8800       5.6       212       179       100
VIS    2025250     91400   19.8700 -116.9100       4.9       216       186       100
VIS    2025250     91400   19.8700 -117.6600       4.3       107       163        92
VIS    2025250     91400   19.8500 -117.7000       5.2       133       152       100
VIS    2025250     91400   19.8500 -117.7100       5.2       133       152        99
VIS    2025250     91400   19.8500 -118.0000       4.6       119       141        99
VIS    2025250     91400   19.8500 -118.0200       5.2       123       141       100
VIS    2025250     91400   19.8600 -118.0400       5.3       118       142       100
VIS    2025250     91400   19.8500 -118.0600       6.0       122       143       100
VIS    2025250     91400   19.8400 -118.2200       5.6        96       137        98
VIS    2025250     91400   19.8400 -118.2400       6.1        90       139        98
VIS    2025250     91400   19.8500 -118.2500       5.9        91       140        97
VIS    2025250     91400   19.8400 -118.2900       6.6        81       141       100
VIS    2025250     91400   19.8500 -118.3300       6.7        78       144        92
VIS    2025250     91400   19.8500 -118.3300       6.3        80       145        93
VIS    2025250     91400   19.8400 -118.3800       4.1        63       150        95
VIS    2025250     91400   19.8300 -118.4000       4.9        52       153        94
VIS    2025250     91400   19.8300 -118.4600       4.8        13       157        98
VIS    2025250     91400   19.8400 -118.4800       4.2       360       158        99
VIS    2025250     91400   19.8400 -118.5100       4.4       352       158        99
VIS    2025250     91400   19.8300 -118.5500       5.1       346       158        97
VIS    2025250     91400   19.8500 -118.5600       5.0       339       161        99
VIS    2025250     91400   19.8500 -118.5800       5.1       336       162        98
VIS    2025250     91400   19.8400 -118.7000      11.2        70       167        99
VIS    2025250     91400   19.8200 -118.7300      11.5        73       167        93
VIS    2025250     91400   19.8200 -118.8400       7.3        63       174       100
VIS    2025250     91400   19.8200 -118.8600       7.3        58       171       100
VIS    2025250     91400   19.8200 -118.9000       7.7        54       169        97
VIS    2025250     91400   19.8200 -118.9100       7.9        56       169        98
VIS    2025250     91400   19.8400 -118.9600       8.0        23       181        97
VIS    2025250     91400   19.8400 -118.9900       7.7        23       182       100
VIS    2025250     91400   19.8200 -119.0400       9.1         7       178        95
VIS    2025250     91400   19.8300 -119.0500       9.3         6       179        99
VIS    2025250     91400   20.0000 -112.2400       4.8       118       140       100
VIS    2025250     91400   20.0100 -112.2500       5.4       116       141        98
VIS    2025250     91400   20.0000 -112.3800       4.9       119       153        93
VIS    2025250     91400   19.9700 -112.8400      10.2       119       129       100
VIS    2025250     91400   19.9700 -112.8800       9.2       125       133        92
VIS    2025250     91400   19.9900 -112.9400       8.3       123       131        99
VIS    2025250     91400   19.9700 -112.9800       8.9       122       128        92
VIS    2025250     91400   19.9800 -113.0000      10.3       123       128        99
VIS    2025250     91400   19.9600 -113.0400      10.8       120       126        92
VIS    2025250     91400   19.9700 -113.0600      11.4       125       124       100
VIS    2025250     91400   19.9800 -113.0800      11.6       128       125        99
VIS    2025250     91400   19.9700 -113.1200      11.2       128       125       100
VIS    2025250     91400   19.9600 -113.1500      10.5       123       122        99
VIS    2025250     91400   19.9600 -113.1800      10.3       120       122        98
VIS    2025250     91400   19.9700 -113.2700      11.5       131       120        95
VIS    2025250     91400   19.9700 -113.2800      10.9       140       117        91
VIS    2025250     91400   19.9600 -113.3200      11.7       138       116        98
VIS    2025250     91400   19.9500 -113.4800       8.9       156       113        99
VIS    2025250     91400   19.9600 -113.4900       9.0       157       113       100
VIS    2025250     91400   19.9600 -113.5400       9.2       161       112        94
VIS    2025250     91400   19.9500 -113.5700       9.2       145       107        90
VIS    2025250     91400   19.9600 -113.6000      10.8       167       107        98
VIS    2025250     91400   19.9400 -113.8200       9.4       171       109        99
VIS    2025250     91400   19.9400 -113.8300       9.3       173       110        99
VIS    2025250     91400   19.9400 -113.8900       9.2       179       113       100
VIS    2025250     91400   19.9400 -113.8900       9.0       180       113       100
VIS    2025250     91400   19.9300 -113.9300       8.4       183       113        98
VIS    2025250     91400   19.9500 -113.9500       8.6       188       115        99
VIS    2025250     91400   19.9400 -114.0000       9.3       194       113        99
VIS    2025250     91400   19.9500 -114.0100       8.7       196       113        99
VIS    2025250     91400   19.9500 -114.0300       8.6       196       113       100
VIS    2025250     91400   19.9300 -114.1200       4.9       170       114        92
VIS    2025250     91400   19.9300 -114.1200       5.0       168       114        93
VIS    2025250     91400   19.9500 -114.1700       8.4       198       117        97
VIS    2025250     91400   19.9300 -114.2700       9.7       218       130       100
VIS    2025250     91400   19.9200 -114.3100       9.5       225       128        98
VIS    2025250     91400   19.9400 -114.3200       9.3       221       128        99
VIS    2025250     91400   19.9300 -114.3800       8.4       206       128        99
VIS    2025250     91400   19.9200 -114.3800       8.3       207       128        97
VIS    2025250     91400   19.9400 -114.4100       8.3       205       136       100
VIS    2025250     91400   19.9400 -114.4400       6.9       208       143        93
VIS    2025250     91400   19.9300 -114.4800       5.7       211       147        91
VIS    2025250     91400   19.9300 -114.5400       5.9       217       153        96
VIS    2025250     91400   19.9100 -114.5500       6.0       226       150        99
VIS    2025250     91400   19.9000 -115.6000      14.4       152       183        90
VIS    2025250     91400   19.8900 -115.6100      12.6       148       181       100
VIS    2025250     91400   19.9000 -115.6500      11.1       146       176       100
VIS    2025250     91400   19.9000 -115.6700      10.4       148       174        99
VIS    2025250     91400   19.8900 -115.6900       9.4       145       173       100
VIS    2025250     91400   19.8800 -115.7300       9.2       145       168       100
VIS    2025250     91400   19.8800 -115.7700       8.6       142       159        96
VIS    2025250     91400   19.8800 -115.8000       6.8       130       151       100
VIS    2025250     91400   19.8800 -115.8000       6.6       127       151        97
VIS    2025250     91400   19.8800 -115.8300       7.3       138       151        98
VIS    2025250     91400   19.8800 -115.8800      10.0       148       151        99
VIS    2025250     91400   19.8800 -115.8900      10.0       149       149        99
VIS    2025250     91400   19.8700 -115.9400       9.3       151       145       100
VIS    2025250     91400   19.8700 -115.9600       9.2       152       144       100
VIS    2025250     91400   19.8900 -115.9900       9.1       151       142       100
VIS    2025250     91400   19.8700 -116.0000       8.9       152       142        99
VIS    2025250     91400   19.8900 -116.0400       6.7       148       144        92
VIS    2025250     91400   19.8700 -116.0800       5.9       152       145        93
VIS    2025250     91400   19.8700 -116.1100       5.7       152       142        96
VIS    2025250     91400   19.8900 -116.1100       6.0       155       141        99
VIS    2025250     91400   19.8900 -116.1400       6.1       163       141       100
VIS    2025250     91400   19.8800 -116.1800       6.9       167       146        95
VIS    2025250     91400   19.8900 -116.1900       7.3       168       146        96
VIS    2025250     91400   19.8800 -116.2200       7.9       172       154        96
VIS    2025250     91400   19.8600 -116.2700       8.1       182       165       100
VIS    2025250     91400   19.8700 -116.2900       7.7       182       168        99
VIS    2025250     91400   19.8800 -116.3300       7.5       188       181       100
VIS    2025250     91400   19.8700 -116.3400       7.5       191       183        99
VIS    2025250     91400   19.8800 -116.4900       7.0       202       185        92
VIS    2025250     91400   19.8700 -116.5500       6.0       173       180        92
VIS    2025250     91400   19.8600 -116.5700       6.0       168       176        99
VIS    2025250     91400   19.8600 -116.6100       4.5       157       167        96
VIS    2025250     91400   19.8500 -116.6200       4.4       156       167        99
VIS    2025250     91400   19.8600 -116.6600       4.4       157       163        99
VIS    2025250     91400   19.8600 -116.6800       4.1       165       163        96
VIS    2025250     91400   19.8700 -116.7200       4.9       179       165        97
VIS    2025250     91400   19.8700 -116.7300       4.9       180       165        96
VIS    2025250     91400   19.8500 -116.7600       4.1       192       166        95
VIS    2025250     91400   19.8700 -116.7800       4.4       197       169        98
VIS    2025250     91400   19.8600 -116.8300       6.6       202       176       100
VIS    2025250     91400   19.8500 -116.8400       6.4       203       173       100
VIS    2025250     91400   19.8600 -116.8900       5.2       216       179        99
VIS    2025250     91400   19.8600 -116.8900       5.0       217       181        98
VIS    2025250     91400   19.8300 -117.6800       5.0       108       156        99
VIS    2025250     91400   19.8300 -117.9500       5.1       100       144        92
VIS    2025250     91400   19.8200 -117.9900       4.2       102       142        97
VIS    2025250     91400   19.8400 -118.0200       5.4       123       142       100
VIS    2025250     91400   19.8300 -118.0500       5.7       117       143       100
VIS    2025250     91400   19.8200 -118.0800       5.1       112       145        99
VIS    2025250     91400   19.8200 -118.0800       5.1       113       146        99
VIS    2025250     91400   19.8100 -118.1600       5.4       108       147        99
VIS    2025250     91400   19.8200 -118.1700       5.0       105       144        98
VIS    2025250     91400   19.8300 -118.2100       5.4        93       136        99
VIS    2025250     91400   19.8100 -118.2400       6.4        85       141       100
VIS    2025250     91400   19.8300 -118.2500       6.3        85       140        99
VIS    2025250     91400   19.8100 -118.2800       6.5        78       144       100
VIS    2025250     91400   19.8300 -118.3100       7.0        71       145        97
VIS    2025250     91400   19.8200 -118.3300       6.7        69       148        93
VIS    2025250     91400   19.8100 -118.3700       4.6        50       157        93
VIS    2025250     91400   19.8200 -118.3800       4.5        49       157        98
VIS    2025250     91400   19.8300 -118.4100       5.0        46       156        96
VIS    2025250     91400   19.8200 -118.4500       5.0        17       157        99
VIS    2025250     91400   19.8000 -118.4700       5.1        12       158       100
VIS    2025250     91400   19.8200 -118.5000       4.4       355       158        97
VIS    2025250     91400   19.8200 -118.5200       4.5       354       158       100
VIS    2025250     91400   19.8200 -118.5900       5.5       346       163        96
VIS    2025250     91400   19.8000 -118.6200       6.9       345       164        96
VIS    2025250     91400   19.8000 -118.6500       7.8       348       166        99
VIS    2025250     91400   19.8200 -118.7200      11.0        71       167        95
VIS    2025250     91400   19.8100 -118.8100       7.5        62       174       100
VIS    2025250     91400   19.8000 -118.8300       7.4        59       172       100
VIS    2025250     91400   19.8000 -118.8600       7.1        58       171       100
VIS    2025250     91400   19.8000 -118.8800       7.8        57       169       100
VIS    2025250     91400   19.8100 -118.9200       7.9        55       169        97
VIS    2025250     91400   20.0600 -109.8300       7.7        65       162        93
VIS    2025250     91400   20.0500 -109.9000       6.9        36       143        97
VIS    2025250     91400   20.0600 -110.0300       4.9        69       165        99
VIS    2025250     91400   19.9700 -112.2000       4.0       111       141        96
VIS    2025250     91400   19.9800 -112.2800       5.1       118       139        98
VIS    2025250     91400   19.9600 -112.3100       4.9       121       137       100
VIS    2025250     91400   19.9500 -112.8200      10.3       115       129        99
VIS    2025250     91400   19.9400 -112.8500       9.8       116       127        99
VIS    2025250     91400   19.9400 -112.8700       9.6       115       127        99
VIS    2025250     91400   19.9600 -112.8900       9.1       122       129        97
VIS    2025250     91400   19.9400 -112.9400       9.2       121       132        95
VIS    2025250     91400   19.9400 -112.9700       9.4       116       128        96
VIS    2025250     91400   19.9500 -113.0000       9.8       121       128        96
VIS    2025250     91400   19.9400 -113.0200      10.2       119       127        98
VIS    2025250     91400   19.9600 -113.0500      10.9       121       125        96
VIS    2025250     91400   19.9400 -113.0700      13.3       125       122        97
VIS    2025250     91400   19.9400 -113.1400      10.2       126       122        98
VIS    2025250     91400   19.9300 -113.1700       9.7       126       121        98
VIS    2025250     91400   19.9500 -113.1800      10.3       119       122        98
VIS    2025250     91400   19.9300 -113.3700      10.5       146       114        99
VIS    2025250     91400   19.9500 -113.4100      11.8       147       115        95
VIS    2025250     91400   19.9400 -113.4100      11.4       147       115        96
VIS    2025250     91400   19.9300 -113.4700       9.1       153       113        91
VIS    2025250     91400   19.9300 -113.5000       9.4       156       112        99
VIS    2025250     91400   19.9300 -113.8300       9.4       173       109        99
VIS    2025250     91400   19.9200 -113.8700       9.2       177       110       100
VIS    2025250     91400   19.9100 -113.9000       9.4       179       110       100
VIS    2025250     91400   19.9100 -113.9100       9.5       180       110        99
VIS    2025250     91400   19.9200 -113.9500       8.8       183       111        99
VIS    2025250     91400   19.9100 -113.9900       8.0       184       108        99
VIS    2025250     91400   19.9100 -114.0000       8.1       185       107        98
VIS    2025250     91400   19.9300 -114.0200       9.6       195       111        99
VIS    2025250     91400   19.9200 -114.1200       4.9       170       114        93
VIS    2025250     91400   19.9100 -114.1800       8.6       210       116        94
VIS    2025250     91400   19.9000 -114.2000       8.5       211       116        93
VIS    2025250     91400   19.9200 -114.2700       9.4       223       128        99
VIS    2025250     91400   19.9200 -114.3000       9.4       226       128        98
VIS    2025250     91400   19.9100 -114.3200       9.3       230       128        97
VIS    2025250     91400   19.9100 -114.3400       8.2       219       126        99
VIS    2025250     91400   19.9000 -114.3900       8.2       219       128       100
VIS    2025250     91400   19.8900 -114.4000       8.2       221       128        99
VIS    2025250     91400   19.8900 -114.4300       7.6       230       130        93
VIS    2025250     91400   19.9000 -114.4700       6.2       224       137        99
VIS    2025250     91400   19.9000 -114.5000       6.1       216       142        99
VIS    2025250     91400   19.9100 -114.5200       5.9       215       147        98
VIS    2025250     91400   19.9100 -114.5600       6.0       230       149       100
VIS    2025250     91400   19.8800 -115.6300      12.1       145       180        97
VIS    2025250     91400   19.8600 -115.6700       8.5       140       173       100
VIS    2025250     91400   19.8600 -115.7000       8.4       145       173        99
VIS    2025250     91400   19.8500 -115.7300       8.9       146       166       100
VIS    2025250     91400   19.8600 -115.7400       9.0       145       166       100
VIS    2025250     91400   19.8700 -115.7700       8.4       142       157        96
VIS    2025250     91400   19.8700 -115.8000       6.6       129       151       100
VIS    2025250     91400   19.8700 -115.8300       6.9       134       151        98
VIS    2025250     91400   19.8700 -115.8500       7.4       139       153        98
VIS    2025250     91400   19.8700 -115.8900       9.8       149       148        99
VIS    2025250     91400   19.8500 -115.9300      10.0       153       144       100
VIS    2025250     91400   19.8700 -115.9600       9.2       154       143       100
VIS    2025250     91400   19.8700 -116.0100       8.5       152       142        99
VIS    2025250     91400   19.8700 -116.0400       7.2       153       144        99
VIS    2025250     91400   19.8700 -116.0400       7.0       153       144        99
VIS    2025250     91400   19.8400 -116.0900       5.8       157       149        98
VIS    2025250     91400   19.8600 -116.1100       5.5       153       142        97
VIS    2025250     91400   19.8500 -116.1300       5.8       155       143        96
VIS    2025250     91400   19.8600 -116.1700       5.7       162       146        94
VIS    2025250     91400   19.8600 -116.1900       6.2       165       151        97
VIS    2025250     91400   19.8400 -116.2400       7.2       178       158       100
VIS    2025250     91400   19.8400 -116.2400       7.5       179       160       100
VIS    2025250     91400   19.8600 -116.2700       7.9       182       166       100
VIS    2025250     91400   19.8400 -116.3000       7.1       185       173       100
VIS    2025250     91400   19.8600 -116.3500       7.2       191       185        95
VIS    2025250     91400   19.8300 -116.4500       7.5       202       184       100
VIS    2025250     91400   19.8500 -116.5700       6.4       169       180        98
VIS    2025250     91400   19.8400 -116.5800       5.9       164       182       100
VIS    2025250     91400   19.8500 -116.6200       4.6       158       170       100
VIS    2025250     91400   19.8300 -116.6600       4.0       166       169        98
VIS    2025250     91400   19.8400 -116.7300       4.1       182       166        98
VIS    2025250     91400   19.8200 -116.8200       4.1       199       171        90
VIS    2025250     91400   19.8300 -116.8300       5.1       202       171       100
VIS    2025250     91400   19.8300 -116.8500       5.2       202       175       100
VIS    2025250     91400   19.8300 -116.8800       4.6       206       179        99
VIS    2025250     91400   19.8400 -116.9200       5.0       219       186        97
VIS    2025250     91400   19.8200 -117.6700       4.6        99       161       100
VIS    2025250     91400   19.8100 -117.8100       7.4       170       170        99
VIS    2025250     91400   19.8000 -117.9200       5.8        96       146        96
VIS    2025250     91400   19.8100 -117.9300       6.2       101       146        93
VIS    2025250     91400   19.7900 -117.9800       4.2        88       142        96
VIS    2025250     91400   19.7900 -117.9900       4.0        95       142        96
VIS    2025250     91400   19.7900 -118.0400       4.4       104       143        98
VIS    2025250     91400   19.7900 -118.0600       4.6        99       143       100
VIS    2025250     91400   19.7900 -118.0700       4.9        95       143       100
VIS    2025250     91400   19.7900 -118.1100       5.2        99       148        99
VIS    2025250     91400   19.7900 -118.1400       5.2       104       150        99
VIS    2025250     91400   19.8000 -118.1700       5.2       110       150        97
VIS    2025250     91400   19.7900 -118.2000       5.3       107       150        90
VIS    2025250     91400   19.8000 -118.2200       6.0        92       142        99
VIS    2025250     91400   19.8100 -118.2500       6.5        83       143       100
VIS    2025250     91400   19.7900 -118.2800       6.3        79       144       100
VIS    2025250     91400   19.8000 -118.3000       6.3        72       148       100
VIS    2025250     91400   19.8000 -118.3300       6.2        65       151        96
VIS    2025250     91400   19.8000 -118.3600       5.1        54       157        92
VIS    2025250     91400   19.8000 -118.3800       4.3        46       157        98
VIS    2025250     91400   19.7900 -118.4000       4.7        33       157        97
VIS    2025250     91400   19.8000 -118.4300       5.0        14       157        98
VIS    2025250     91400   19.8000 -118.4600       5.0        10       157       100
VIS    2025250     91400   19.8000 -118.4800       5.5        12       158        97
VIS    2025250     91400   19.7900 -118.5100       4.5       354       157        99
VIS    2025250     91400   19.7900 -118.5300       4.4       353       158        90
VIS    2025250     91400   19.7800 -118.6100       7.4       347       163        93
VIS    2025250     91400   19.7900 -118.8100       8.2        57       170        97
VIS    2025250     91400   19.7800 -118.8400       7.5        58       169       100
VIS    2025250     91400   19.7800 -118.8800       7.6        59       168        99
VIS    2025250     91400   19.7700 -118.9100       7.7        58       167        98
VIS    2025250     91400   19.7700 -118.9200       7.6        56       167        99
VIS    2025250     91400   19.7800 -118.9600       7.0        31       169       100
VIS    2025250     91400   19.7700 -118.9700       6.8        24       169       100
VIS    2025250     91400   19.7700 -119.0100       7.5        12       174        98
VIS    2025250     91400   20.0200 -109.8100       8.2        79       176       100
VIS    2025250     91400   20.0400 -109.9200       6.3        31       143       100
VIS    2025250     91400   19.9600 -112.1500       5.7       106       139        99
VIS    2025250     91400   19.9400 -112.1800       5.0       106       137        99
VIS    2025250     91400   19.9400 -112.2000       4.7       104       137        99
VIS    2025250     91400   19.9600 -112.2900       5.3       123       137        98
VIS    2025250     91400   19.9400 -112.3300       4.7       130       133        99
VIS    2025250     91400   19.9400 -112.3400       4.4       130       133        98
VIS    2025250     91400   19.9400 -112.8000      10.2       116       134        96
VIS    2025250     91400   19.9200 -112.8300       9.7       113       128        99
VIS    2025250     91400   19.9400 -112.8600       9.6       115       127        99
VIS    2025250     91400   19.9200 -112.9000       8.9       113       127        96
VIS    2025250     91400   19.9200 -112.9000       8.9       113       128        97
VIS    2025250     91400   19.9300 -112.9400       9.2       121       132        95
VIS    2025250     91400   19.9300 -112.9700       9.7       117       128        99
VIS    2025250     91400   19.9300 -113.0000      10.0       117       128       100
VIS    2025250     91400   19.9300 -113.0700      13.2       126       122        99
VIS    2025250     91400   19.9200 -113.1000      10.5       124       122        90
VIS    2025250     91400   19.9200 -113.1900       9.5       120       117        95
VIS    2025250     91400   19.9100 -113.2100       9.2       111       116        95
VIS    2025250     91400   19.9100 -113.2800       8.8       142       116        93
VIS    2025250     91400   19.9100 -113.3900      10.3       144       113        95
VIS    2025250     91400   19.9000 -113.4000      10.1       143       113        96
VIS    2025250     91400   19.9000 -113.4400       8.9       145       112        98
VIS    2025250     91400   19.9000 -113.4600       8.6       148       110        95
VIS    2025250     91400   19.9200 -113.4800       9.1       151       112        90
VIS    2025250     91400   19.9100 -113.5500      11.8       112       105        99
VIS    2025250     91400   19.9100 -113.5800      10.8       121       103        92
VIS    2025250     91400   19.8900 -113.7800       8.3       166       107        93
VIS    2025250     91400   19.8900 -113.8000       9.5       163       107        96
VIS    2025250     91400   19.9100 -113.8300       9.5       164       108        96
VIS    2025250     91400   19.8900 -113.8800       8.3       174       108       100
VIS    2025250     91400   19.8900 -113.8900       8.6       175       109       100
VIS    2025250     91400   19.8900 -113.9300       9.5       183       107        99
VIS    2025250     91400   19.8800 -113.9500       9.4       188       105        97
VIS    2025250     91400   19.9000 -113.9900       7.9       185       107        98
VIS    2025250     91400   19.8800 -114.1200       7.4       210       115       100
VIS    2025250     91400   19.8800 -114.1500       7.1       210       115       100
VIS    2025250     91400   19.8900 -114.2500       8.3       222       123        98
VIS    2025250     91400   19.8700 -114.2700       8.6       219       123        97
VIS    2025250     91400   19.8900 -114.3100      10.0       231       127        98
VIS    2025250     91400   19.8900 -114.3400       9.7       234       126        97
VIS    2025250     91400   19.8700 -114.3700       8.0       209       127        99
VIS    2025250     91400   19.8700 -114.3800       7.6       216       127        98
VIS    2025250     91400   19.8900 -114.4200       7.9       228       130        99
VIS    2025250     91400   19.8800 -114.4400       7.5       228       130        98
VIS    2025250     91400   19.8700 -114.4700       6.6       227       129        99
VIS    2025250     91400   19.8700 -114.5000       5.8       231       132        99
VIS    2025250     91400   19.8800 -114.5300       5.6       227       139        98
VIS    2025250     91400   19.8400 -115.6200      11.1       148       183        99
VIS    2025250     91400   19.8300 -115.6300      10.1       146       183       100
VIS    2025250     91400   19.8500 -115.6800       8.2       143       173       100
VIS    2025250     91400   19.8300 -115.7000       7.3       150       172        94
VIS    2025250     91400   19.8300 -115.7400       9.2       147       161        95
VIS    2025250     91400   19.8500 -115.7700       8.4       143       159        96
VIS    2025250     91400   19.8400 -115.8200       5.0       133       150        96
VIS    2025250     91400   19.8400 -115.8300       5.3       133       150        99
VIS    2025250     91400   19.8400 -115.8800       7.7       146       148        99
VIS    2025250     91400   19.8400 -115.9000       8.5       151       147       100
VIS    2025250     91400   19.8400 -115.9300       8.9       154       144        92
VIS    2025250     91400   19.8300 -115.9900       6.8       165       143       100
VIS    2025250     91400   19.8200 -116.0100       6.5       164       142        99
VIS    2025250     91400   19.8200 -116.0300       6.9       160       142       100
VIS    2025250     91400   19.8400 -116.0500       7.7       157       147       100
VIS    2025250     91400   19.8400 -116.0900       5.8       157       149        98
VIS    2025250     91400   19.8300 -116.1100       5.5       159       149        99
VIS    2025250     91400   19.8200 -116.1600       5.7       165       151        92
VIS    2025250     91400   19.8300 -116.1700       5.7       165       151        91
VIS    2025250     91400   19.8400 -116.1900       5.7       166       155        95
VIS    2025250     91400   19.8400 -116.2400       7.1       178       158       100
VIS    2025250     91400   19.8200 -116.2500       7.9       179       162       100
VIS    2025250     91400   19.8300 -116.2800       7.7       180       169       100
VIS    2025250     91400   19.8300 -116.3300       6.6       191       174       100
VIS    2025250     91400   19.8200 -116.3400       7.3       184       176       100
VIS    2025250     91400   19.8100 -116.3700       7.7       181       184        99
VIS    2025250     91400   19.8200 -116.6000       5.5       166       185        99
VIS    2025250     91400   19.8200 -116.6200       4.8       170       181       100
VIS    2025250     91400   19.8200 -116.6400       4.6       170       179        99
VIS    2025250     91400   19.8000 -116.6800       4.8       162       179       100
VIS    2025250     91400   19.8100 -116.7200       4.1       168       168       100
VIS    2025250     91400   19.8200 -116.8200       4.1       198       171        94
VIS    2025250     91400   19.8200 -116.8400       4.7       198       173       100
VIS    2025250     91400   19.8200 -116.8700       4.5       200       179        98
VIS    2025250     91400   19.7700 -117.9700       4.5        86       141        98
VIS    2025250     91400   19.7700 -117.9700       4.4        83       141        97
VIS    2025250     91400   19.7900 -118.0000       4.0        93       142        96
VIS    2025250     91400   19.7900 -118.0400       4.5       102       143       100
VIS    2025250     91400   19.7700 -118.0700       5.2        99       143        98
VIS    2025250     91400   19.7800 -118.0800       5.1        93       144       100
VIS    2025250     91400   19.7600 -118.1300       5.3        97       148        97
VIS    2025250     91400   19.7800 -118.1400       5.1       104       150        99
VIS    2025250     91400   19.7600 -118.1700       4.4        97       152        97
VIS    2025250     91400   19.7600 -118.2300       4.7        86       148        98
VIS    2025250     91400   19.7600 -118.2600       5.9        79       146       100
VIS    2025250     91400   19.7800 -118.2800       6.2        76       145       100
VIS    2025250     91400   19.7700 -118.3000       5.4        66       151       100
VIS    2025250     91400   19.7700 -118.3500       5.6        44       154       100
VIS    2025250     91400   19.7600 -118.3500       5.6        41       154        99
VIS    2025250     91400   19.7600 -118.4000       5.2        34       154        98
VIS    2025250     91400   19.7500 -118.6200       7.3         0       166        90
VIS    2025250     91400   19.7500 -118.7000       8.4        73       170       100
VIS    2025250     91400   19.7600 -118.7400       7.8        22       169        99
VIS    2025250     91400   19.7500 -118.7800       7.6        39       165        94
VIS    2025250     91400   19.7600 -118.8100       8.3        54       166        95
VIS    2025250     91400   19.7500 -118.8400       8.2        60       164       100
VIS    2025250     91400   19.7500 -118.8500       7.8        60       164       100
VIS    2025250     91400   19.7500 -118.8800       7.6        60       167       100
VIS    2025250     91400   19.7400 -118.9200       7.5        53       168        96
VIS    2025250     91400   19.7500 -118.9300       7.2        50       167        97
VIS    2025250     91400   19.7600 -118.9600       6.7        32       169       100
VIS    2025250     91400   19.7500 -119.0000       6.9        29       169        96
VIS    2025250     91400   19.7500 -119.0100       7.0        30       168        98
VIS    2025250     91400   19.7500 -119.0300       8.0        16       169       100
VIS    2025250     91400   19.9900 -109.9200       6.2        83       169        96
VIS    2025250     91400   20.0000 -110.1000       4.8        51       181        97
VIS    2025250     91400   19.9100 -112.1600       6.2       104       140       100
VIS    2025250     91400   19.9100 -112.1800       5.6       107       139       100
VIS    2025250     91400   19.9200 -112.2100       4.8       104       138       100
VIS    2025250     91400   19.9300 -112.3500       4.0       126       133        98
VIS    2025250     91400   19.9100 -112.7800      10.3       112       131        99
VIS    2025250     91400   19.9100 -112.8000      10.0       113       130       100
VIS    2025250     91400   19.9100 -112.8400       9.5       114       128        97
VIS    2025250     91400   19.9100 -112.8400       9.5       114       128        98
VIS    2025250     91400   19.9100 -112.8900       9.1       114       127        92
VIS    2025250     91400   19.9000 -112.9000       9.1       113       129        94
VIS    2025250     91400   19.9100 -113.0000      10.8       120       126       100
VIS    2025250     91400   19.9000 -113.0600      12.7       126       125        96
VIS    2025250     91400   19.9000 -113.0800      12.9       128       123        99
VIS    2025250     91400   19.9000 -113.2800      10.2       148       116        90
VIS    2025250     91400   19.8800 -113.4000       9.4       140       110        92
VIS    2025250     91400   19.8700 -113.4300       8.7       140       109        98
VIS    2025250     91400   19.8800 -113.4300       8.9       143       109        99
VIS    2025250     91400   19.8800 -113.4700       8.2       146       109        99
VIS    2025250     91400   19.8800 -113.6000       9.3       121       103        96
VIS    2025250     91400   19.8900 -113.6500       6.2       142       105        99
VIS    2025250     91400   19.8600 -113.7400       6.8       173       105        98
VIS    2025250     91400   19.8700 -113.7600       7.2       171       105        98
VIS    2025250     91400   19.8700 -113.7800       7.8       169       105        97
VIS    2025250     91400   19.8700 -113.8100       8.9       163       107        97
VIS    2025250     91400   19.8600 -113.8600       8.1       168       107       100
VIS    2025250     91400   19.8800 -113.8900       8.0       173       107       100
VIS    2025250     91400   19.8800 -113.9000       8.2       173       107       100
VIS    2025250     91400   19.8800 -113.9300       9.0       184       105        98
VIS    2025250     91400   19.8600 -114.0900       6.2       210       116        92
VIS    2025250     91400   19.8700 -114.1200       7.2       210       115        98
VIS    2025250     91400   19.8700 -114.1200       7.0       212       115       100
VIS    2025250     91400   19.8500 -114.1600       5.6       218       114        95
VIS    2025250     91400   19.8600 -114.2700       8.1       222       120        99
VIS    2025250     91400   19.8500 -114.3200      11.5       224       125       100
VIS    2025250     91400   19.8600 -114.3400      11.8       223       125       100
VIS    2025250     91400   19.8600 -114.3800       8.7       201       126        99
VIS    2025250     91400   19.8600 -114.3800       8.5       204       126       100
VIS    2025250     91400   19.8400 -114.4200       8.6       198       125       100
VIS    2025250     91400   19.8500 -114.4400       6.8       225       126       100
VIS    2025250     91400   19.8500 -114.4700       6.3       229       126       100
VIS    2025250     91400   19.8400 -114.5200       5.2       234       125        99
VIS    2025250     91400   19.8400 -114.5500       5.1       231       128        97
VIS    2025250     91400   19.8400 -114.5600       4.6       237       128       100
VIS    2025250     91400   19.8400 -114.5900       4.5       231       140        95
VIS    2025250     91400   19.8500 -114.6100       4.7       229       150        99
VIS    2025250     91400   19.8200 -115.6300      11.0       150       183       100
VIS    2025250     91400   19.8300 -115.6400      10.3       148       183       100
VIS    2025250     91400   19.8200 -115.6800       6.3       151       172        97
VIS    2025250     91400   19.8300 -115.7000       7.2       150       172        93
VIS    2025250     91400   19.8200 -115.7400       9.1       147       162        96
VIS    2025250     91400   19.8200 -115.7700       8.1       143       159        98
VIS    2025250     91400   19.8200 -115.8300       5.3       140       148        94
VIS    2025250     91400   19.8200 -115.8700       7.3       143       148       100
VIS    2025250     91400   19.8100 -115.9000       8.1       150       146       100
VIS    2025250     91400   19.8000 -115.9400       6.2       158       144       100
VIS    2025250     91400   19.8100 -115.9600       6.5       159       144        92
VIS    2025250     91400   19.8100 -116.0000       6.4       163       143       100
VIS    2025250     91400   19.8200 -116.0000       6.5       164       143       100
VIS    2025250     91400   19.8200 -116.0300       6.9       160       142       100
VIS    2025250     91400   19.8000 -116.0600       7.8       157       140       100
VIS    2025250     91400   19.8000 -116.0900       7.6       157       145        99
VIS    2025250     91400   19.8100 -116.1400       5.7       166       150        96
VIS    2025250     91400   19.8100 -116.1400       6.1       167       151        96
VIS    2025250     91400   19.7900 -116.1800       7.1       168       151        99
VIS    2025250     91400   19.8100 -116.2100       6.2       172       156        95
VIS    2025250     91400   19.8100 -116.2400       7.7       179       160        99
VIS    2025250     91400   19.8100 -116.2700       7.9       179       165       100
VIS    2025250     91400   19.7900 -116.2900       7.7       180       169        99
VIS    2025250     91400   19.7900 -116.3400       7.0       180       174       100
VIS    2025250     91400   19.7900 -116.3400       7.1       180       174       100
VIS    2025250     91400   19.8100 -116.3800       7.6       182       184       100
VIS    2025250     91400   19.8000 -116.4100       6.8       193       184        99
VIS    2025250     91400   19.7900 -116.4200       7.0       199       184        98
VIS    2025250     91400   19.8000 -116.6400       5.7       171       185        99
VIS    2025250     91400   19.7900 -116.6600       5.8       166       183       100
VIS    2025250     91400   19.7900 -116.6900       5.2       159       179       100
VIS    2025250     91400   19.7900 -116.7200       4.4       162       171        98
VIS    2025250     91400   19.7800 -116.8700       4.4       197       185        99
VIS    2025250     91400   19.7600 -117.9600       4.0        81       141        99
VIS    2025250     91400   19.7600 -117.9700       4.3        80       141        98
VIS    2025250     91400   19.7500 -118.0400       4.4        98       142        95
VIS    2025250     91400   19.7400 -118.0700       5.7       105       142        97
VIS    2025250     91400   19.7500 -118.0900       6.9       105       143        98
VIS    2025250     91400   19.7600 -118.1300       5.2        95       146        98
VIS    2025250     91400   19.7500 -118.1600       5.5        94       148       100
VIS    2025250     91400   19.7400 -118.1700       5.4        92       150       100
VIS    2025250     91400   19.7400 -118.2200       4.1        83       151        96
VIS    2025250     91400   19.7400 -118.2400       4.2        82       151        97
VIS    2025250     91400   19.7400 -118.2500       4.2        80       151        95
VIS    2025250     91400   19.7500 -118.2700       5.6        74       147       100
VIS    2025250     91400   19.7300 -118.3200       6.1        52       154        98
VIS    2025250     91400   19.7300 -118.3400       6.4        50       154        99
VIS    2025250     91400   19.7500 -118.3700       5.9        40       154        92
VIS    2025250     91400   19.7400 -118.4000       7.6        53       154        90
VIS    2025250     91400   19.7300 -118.4700       9.4        71       157        95
VIS    2025250     91400   19.7200 -118.6400       8.3        32       169        90
VIS    2025250     91400   19.7300 -118.6700       8.8        55       169       100
VIS    2025250     91400   19.7400 -118.7100       8.1        71       170        99
VIS    2025250     91400   19.7300 -118.7100       8.1        70       170        98
VIS    2025250     91400   19.7400 -118.7500       7.8        23       166       100
VIS    2025250     91400   19.7300 -118.7700       7.7        38       164       100
VIS    2025250     91400   19.7200 -118.8100       8.5        62       158       100
VIS    2025250     91400   19.7200 -118.8400       8.1        64       159       100
VIS    2025250     91400   19.7200 -118.8600       7.8        64       164       100
VIS    2025250     91400   19.7300 -118.8700       7.6        63       164       100
VIS    2025250     91400   19.7300 -118.9100       7.5        56       169        98
VIS    2025250     91400   19.7200 -118.9500       7.4        38       170        96
VIS    2025250     91400   19.7300 -118.9800       7.1        36       170        96
VIS    2025250     91400   19.7300 -118.9900       7.1        35       169        93
VIS    2025250     91400   19.7100 -119.0100       7.4        36       168       100
VIS    2025250     91400   19.7300 -119.0600       8.7         9       169        94
VIS    2025250     91400   19.7100 -119.0700       7.8        27       170        96
VIS    2025250     91400   19.9700 -109.8200       7.5        72       166        98
VIS    2025250     91400   19.9800 -109.8600       8.6        80       165        98
VIS    2025250     91400   19.9900 -109.8900       8.4        77       172        97
VIS    2025250     91400   19.9600 -109.9700       4.9        65       172        99
VIS    2025250     91400   19.9600 -110.0600       5.1        67       178        98
VIS    2025250     91400   19.9600 -110.0700       5.0        64       178        99
VIS    2025250     91400   19.9700 -110.1000       5.4        36       181        95
VIS    2025250     91400   19.8800 -112.7700       9.7       107       134        99
VIS    2025250     91400   19.8800 -112.8200       9.5       113       129       100
VIS    2025250     91400   19.8700 -112.8200       9.4       113       126       100
VIS    2025250     91400   19.8700 -112.8600       9.6       116       124       100
VIS    2025250     91400   19.8800 -112.8800       9.7       115       125        99
VIS    2025250     91400   19.8800 -113.1700       9.0       146       117        99
VIS    2025250     91400   19.8500 -113.2500       6.8       131       114        99
VIS    2025250     91400   19.8500 -113.2600       6.9       131       114       100
VIS    2025250     91400   19.8600 -113.3400       9.7       143       111        91
VIS    2025250     91400   19.8700 -113.4200       8.6       134       109        95
VIS    2025250     91400   19.8600 -113.4600       7.4       143       108        95
VIS    2025250     91400   19.8700 -113.4600       7.7       145       108        97
VIS    2025250     91400   19.8600 -113.5600      10.8       102       105        90
VIS    2025250     91400   19.8500 -113.6300       7.0       132       104       100
VIS    2025250     91400   19.8600 -113.6500       7.1       134       104        99
VIS    2025250     91400   19.8600 -113.6900       7.1       168       105        97
VIS    2025250     91400   19.8600 -113.7000       7.2       170       107        99
VIS    2025250     91400   19.8400 -113.7300       6.9       174       105        97
VIS    2025250     91400   19.8400 -113.7600       6.7       173       104       100
VIS    2025250     91400   19.8600 -113.8100       8.2       165       105        98
VIS    2025250     91400   19.8600 -113.8100       8.2       165       105        99
VIS    2025250     91400   19.8500 -113.8600       8.0       168       107       100
VIS    2025250     91400   19.8500 -113.8900       7.1       172       105       100
VIS    2025250     91400   19.8500 -113.9200       6.5       178       105        97
VIS    2025250     91400   19.8300 -114.1200       6.0       213       114        91
VIS    2025250     91400   19.8300 -114.1700       5.3       227       114        91
VIS    2025250     91400   19.8400 -114.2300       7.6       223       116        95
VIS    2025250     91400   19.8300 -114.2500       7.4       226       116        97
VIS    2025250     91400   19.8300 -114.2800       7.1       226       119       100
VIS    2025250     91400   19.8200 -114.3200       6.5       224       120        97
VIS    2025250     91400   19.8400 -114.3500      11.4       220       125       100
VIS    2025250     91400   19.8400 -114.3800       9.8       201       125        98
VIS    2025250     91400   19.8300 -114.3900       9.7       201       125        98
VIS    2025250     91400   19.8400 -114.5000       5.6       229       125       100
VIS    2025250     91400   19.8400 -114.5100       5.4       232       125       100
VIS    2025250     91400   19.8200 -114.5600       5.3       225       126        99
VIS    2025250     91400   19.8200 -114.6100       5.6       233       140       100
VIS    2025250     91400   19.8200 -114.6400       5.5       230       148        98
VIS    2025250     91400   19.8100 -114.6500       5.7       231       144        95
VIS    2025250     91400   19.7900 -115.6800       7.0       156       177        93
VIS    2025250     91400   19.7900 -115.7500       8.2       147       165        96
VIS    2025250     91400   19.7800 -115.7600       8.2       149       165        97
VIS    2025250     91400   19.7900 -115.8400       5.6       143       144        90
VIS    2025250     91400   19.7700 -115.8700       6.1       146       142       100
VIS    2025250     91400   19.7800 -115.9200       6.5       155       143       100
VIS    2025250     91400   19.7900 -115.9400       6.1       158       144       100
VIS    2025250     91400   19.7900 -115.9600       5.6       160       144       100
VIS    2025250     91400   19.7800 -115.9900       6.5       162       147       100
VIS    2025250     91400   19.7900 -116.0100       6.7       164       142        99
VIS    2025250     91400   19.7700 -116.0600       7.6       157       140        97
VIS    2025250     91400   19.7900 -116.0800       7.7       157       141        98
VIS    2025250     91400   19.7800 -116.1200       6.9       163       145        98
VIS    2025250     91400   19.7700 -116.1700       7.5       166       146       100
VIS    2025250     91400   19.7700 -116.1800       7.5       166       146       100
VIS    2025250     91400   19.7600 -116.2300       8.7       181       153        98
VIS    2025250     91400   19.7700 -116.2600       9.1       186       163       100
VIS    2025250     91400   19.7800 -116.2600       8.8       184       165       100
VIS    2025250     91400   19.7700 -116.3100       7.4       182       176        98
VIS    2025250     91400   19.7800 -116.3400       7.0       182       174       100
VIS    2025250     91400   19.7800 -116.3600       7.2       184       177       100
VIS    2025250     91400   19.7600 -116.3700       7.2       191       174       100
VIS    2025250     91400   19.7700 -116.4100       7.4       196       179       100
VIS    2025250     91400   19.7700 -116.4300       6.9       200       181        99
VIS    2025250     91400   19.7600 -116.4700       5.3       198       181        99
VIS    2025250     91400   19.7700 -116.7200       4.9       168       179        96
VIS    2025250     91400   19.7700 -116.8100       4.0       192       181        96
VIS    2025250     91400   19.7700 -116.8200       4.1       194       181        96
VIS    2025250     91400   19.7100 -118.0600       4.4       100       138        99
VIS    2025250     91400   19.7200 -118.0700       4.9       103       138        98
VIS    2025250     91400   19.7300 -118.1000       5.6       108       139        98
VIS    2025250     91400   19.7300 -118.1100       5.7       106       139       100
VIS    2025250     91400   19.7100 -118.1600       5.1        97       142       100
VIS    2025250     91400   19.7100 -118.1800       5.5        94       147        99
VIS    2025250     91400   19.7100 -118.3300       5.8        55       157        94
VIS    2025250     91400   19.7300 -118.3500       6.6        51       155        99
VIS    2025250     91400   19.7100 -118.3700       6.5        51       160        92
VIS    2025250     91400   19.7200 -118.4300       9.5        60       156        90
VIS    2025250     91400   19.7100 -118.7000       9.5        69       170        95
VIS    2025250     91400   19.7000 -118.7400       8.6        70       169        92
VIS    2025250     91400   19.7200 -118.8100       8.2        60       161        99
VIS    2025250     91400   19.7000 -118.8500       8.0        64       156       100
VIS    2025250     91400   19.6900 -118.8800       7.7        62       161        98
VIS    2025250     91400   19.7100 -118.8800       7.5        63       164        99
VIS    2025250     91400   19.6900 -118.9300       7.4        49       169        99
VIS    2025250     91400   19.7000 -118.9300       7.4        45       170        99
VIS    2025250     91400   19.7100 -119.0100       7.4        37       168       100
VIS    2025250     91400   19.7000 -119.0300       7.7        39       167        97
VIS    2025250     91400   19.6900 -119.0500       7.9        41       168       100
VIS    2025250     91400   19.7100 -119.0800       7.8        28       171        97
VIS    2025250     91400   19.6900 -119.1100       7.9        21       171        97
VIS    2025250     91400   19.9600 -109.8200       7.4        71       170        99
VIS    2025250     91400   19.9600 -109.8800       8.0        70       173       100
VIS    2025250     91400   19.9600 -109.9100       7.4        61       174        98
VIS    2025250     91400   19.9500 -109.9100       7.4        56       174        95
VIS    2025250     91400   19.9600 -109.9700       4.9        63       172        99
VIS    2025250     91400   19.9500 -110.1000       5.0        40       181       100
VIS    2025250     91400   19.9500 -110.1400       5.1        29       186        94
VIS    2025250     91400   19.8700 -112.1700       6.2       110       142        97
VIS    2025250     91400   19.8600 -112.8100       9.3       114       129        99
VIS    2025250     91400   19.8400 -112.8400       9.3       116       123       100
VIS    2025250     91400   19.8500 -112.8700       9.9       117       124       100
VIS    2025250     91400   19.8500 -112.8900      10.6       118       124        97
VIS    2025250     91400   19.8400 -113.1500      10.7       145       119        96
VIS    2025250     91400   19.8400 -113.2600       7.1       130       114        91
VIS    2025250     91400   19.8400 -113.3800       9.7       125       110        91
VIS    2025250     91400   19.8300 -113.4200       7.9       124       108        93
VIS    2025250     91400   19.8300 -113.4600       6.9       134       108        97
VIS    2025250     91400   19.8400 -113.6400       7.1       132       104       100
VIS    2025250     91400   19.8300 -113.6600       6.6       131       104       100
VIS    2025250     91400   19.8100 -113.6900       7.7       169       105       100
VIS    2025250     91400   19.8100 -113.7100       7.9       169       105       100
VIS    2025250     91400   19.8200 -113.7700       6.7       172       104        97
VIS    2025250     91400   19.8100 -113.8000       7.4       170       104        99
VIS    2025250     91400   19.8200 -113.8200       6.8       165       107        99
VIS    2025250     91400   19.8100 -113.8600       5.9       162       107        96
VIS    2025250     91400   19.8200 -113.8900       6.5       172       107        95
VIS    2025250     91400   19.8300 -113.9000       6.4       172       105       100
VIS    2025250     91400   19.8000 -114.1700       6.0       215       114        91
VIS    2025250     91400   19.8100 -114.2400       7.4       225       116        97
VIS    2025250     91400   19.8200 -114.2600       7.3       226       116        99
VIS    2025250     91400   19.8200 -114.3100       5.8       228       120        97
VIS    2025250     91400   19.8100 -114.3500       9.6       212       123        99
VIS    2025250     91400   19.8000 -114.3900      10.9       207       126        95
VIS    2025250     91400   19.7900 -114.4000      11.2       209       126        93
VIS    2025250     91400   19.8100 -114.5000       5.4       230       125        99
VIS    2025250     91400   19.8000 -114.5700       6.0       219       126        94
VIS    2025250     91400   19.8000 -114.6000       6.2       228       130        98
VIS    2025250     91400   19.8000 -114.6400       6.1       231       136        93
VIS    2025250     91400   19.7800 -114.6700       7.5       242       144        99
VIS    2025250     91400   19.7800 -115.6700       7.1       161       183        93
VIS    2025250     91400   19.7700 -115.6900       7.4       159       182        97
VIS    2025250     91400   19.7600 -115.7300       7.7       156       174       100
VIS    2025250     91400   19.7600 -115.7300       7.7       155       173       100
VIS    2025250     91400   19.7700 -115.7700       7.8       150       165        96
VIS    2025250     91400   19.7700 -115.8500       6.2       143       142        95
VIS    2025250     91400   19.7500 -115.8700       6.9       157       138       100
VIS    2025250     91400   19.7600 -115.9200       6.2       153       140       100
VIS    2025250     91400   19.7700 -115.9400       5.9       158       143       100
VIS    2025250     91400   19.7700 -115.9600       5.8       162       146       100
VIS    2025250     91400   19.7500 -116.0100       8.3       165       143        99
VIS    2025250     91400   19.7600 -116.0200       8.0       163       142        99
VIS    2025250     91400   19.7500 -116.0500       8.2       159       141        99
VIS    2025250     91400   19.7600 -116.0700       7.5       155       141        95
VIS    2025250     91400   19.7500 -116.1300       6.4       163       143        98
VIS    2025250     91400   19.7600 -116.1700       7.6       166       146       100
VIS    2025250     91400   19.7600 -116.1900       7.7       167       147       100
VIS    2025250     91400   19.7400 -116.2200       8.7       176       149        97
VIS    2025250     91400   19.7400 -116.2600       8.8       188       161        98
VIS    2025250     91400   19.7500 -116.2700       8.8       188       165       100
VIS    2025250     91400   19.7600 -116.3100       7.8       185       176        99
VIS    2025250     91400   19.7400 -116.3200       8.0       188       177       100
VIS    2025250     91400   19.7500 -116.3700       6.7       190       176       100
VIS    2025250     91400   19.7500 -116.3900       6.8       195       177        99
VIS    2025250     91400   19.7500 -116.4100       6.7       200       179        99
VIS    2025250     91400   19.7400 -116.4500       5.2       202       178        97
VIS    2025250     91400   19.7500 -116.5100       4.7       194       184        95
VIS    2025250     91400   19.7100 -117.8100       4.1        81       156        93
VIS    2025250     91400   19.6900 -117.9200       4.1        80       142       100
VIS    2025250     91400   19.7000 -118.0900       4.9       105       136       100
VIS    2025250     91400   19.6900 -118.1200       5.0       107       138        99
VIS    2025250     91400   19.6900 -118.1300       5.0       106       138        99
VIS    2025250     91400   19.7000 -118.1600       4.7        97       142       100
VIS    2025250     91400   19.7000 -118.2000       5.4        94       150        91
VIS    2025250     91400   19.7000 -118.2000       5.1        92       150        94
VIS    2025250     91400   19.7000 -118.2600       4.5        61       158        92
VIS    2025250     91400   19.7000 -118.3000       4.3        54       157        93
VIS    2025250     91400   19.7000 -118.3200       5.3        56       157        95
VIS    2025250     91400   19.6900 -118.3500       6.0        50       162        93
VIS    2025250     91400   19.6800 -118.4400       8.7        55       163        90
VIS    2025250     91400   19.6800 -118.5300      11.5        34       159        95
VIS    2025250     91400   19.6900 -118.6500       9.5        52       167        90
VIS    2025250     91400   19.6700 -118.6900      10.9        59       165       100
VIS    2025250     91400   19.6700 -118.7000      10.8        59       165        99
VIS    2025250     91400   19.6700 -118.7400       8.9        63       166        95
VIS    2025250     91400   19.6700 -118.7500       8.6        63       166        96
VIS    2025250     91400   19.6700 -118.7800       8.0        61       166        94
VIS    2025250     91400   19.6900 -118.8200       8.4        65       157       100
VIS    2025250     91400   19.6900 -118.8500       8.0        61       155       100
VIS    2025250     91400   19.6700 -118.8600       8.2        51       158       100
VIS    2025250     91400   19.6800 -118.9000       7.9        57       167        95
VIS    2025250     91400   19.6900 -118.9300       7.4        49       170        99
VIS    2025250     91400   19.6700 -119.0100       7.5        30       167        98
VIS    2025250     91400   19.6700 -119.0300       7.7        39       164        97
VIS    2025250     91400   19.6700 -119.0600       8.2        44       164       100
VIS    2025250     91400   19.6700 -119.1000       8.1        35       170        99
VIS    2025250     91400   19.6800 -119.1100       7.9        21       171        97
VIS    2025250     91400   19.9500 -108.8000       6.9       114       169       100
VIS    2025250     91400   19.9200 -109.8500       7.2        54       184        97
VIS    2025250     91400   19.9100 -109.8800       7.6        50       183        92
VIS    2025250     91400   19.9200 -109.9000       7.9        48       182        97
VIS    2025250     91400   19.9100 -109.9600       5.4        55       174       100
VIS    2025250     91400   19.9100 -110.0800       6.1        44       182        93
VIS    2025250     91400   19.9200 -110.1200       5.2        29       186       100
VIS    2025250     91400   19.9200 -110.1500       4.4        23       189        99
VIS    2025250     91400   19.8600 -112.2000       5.9       103       144        94
VIS    2025250     91400   19.8200 -112.7900       8.8       114       123        98
VIS    2025250     91400   19.8200 -112.8200       9.0       115       122        93
VIS    2025250     91400   19.8400 -112.8300       9.1       116       123        99
VIS    2025250     91400   19.8300 -112.8600       9.7       118       122        99
VIS    2025250     91400   19.8300 -112.8900      11.1       120       124        96
VIS    2025250     91400   19.8200 -113.1700       9.9       145       116        93
VIS    2025250     91400   19.8200 -113.4300       8.1       119       107        91
VIS    2025250     91400   19.8100 -113.5600       8.6       142       104        92
VIS    2025250     91400   19.8100 -113.7000       8.1       168       105       100
VIS    2025250     91400   19.7900 -113.7200       4.9       182       103        92
VIS    2025250     91400   19.8100 -113.8000       7.4       171       104        99
VIS    2025250     91400   19.8100 -113.8400       5.7       161       107        96
VIS    2025250     91400   19.8000 -113.8600       5.8       161       107        96
VIS    2025250     91400   19.7800 -114.0600       7.5       131       109        91
VIS    2025250     91400   19.7900 -114.1400      11.1       190       113        98
VIS    2025250     91400   19.7800 -114.1400      11.4       190       113        99
VIS    2025250     91400   19.7800 -114.1700       9.5       194       113        99
VIS    2025250     91400   19.7700 -114.2000       8.6       188       114       100
VIS    2025250     91400   19.7700 -114.3400       5.8       228       117        92
VIS    2025250     91400   19.7800 -114.3400       6.3       223       120        92
VIS    2025250     91400   19.7700 -114.3700       8.2       217       123       100
VIS    2025250     91400   19.7700 -114.4100      12.6       208       125        97
VIS    2025250     91400   19.7900 -114.4400       6.8       234       124        92
VIS    2025250     91400   19.7700 -114.4800       5.7       210       125       100
VIS    2025250     91400   19.7700 -114.4900       5.4       211       125        97
VIS    2025250     91400   19.7700 -114.6000       6.1       212       128        99
VIS    2025250     91400   19.7800 -114.6100       6.2       225       133        93
VIS    2025250     91400   19.7800 -114.6400       6.7       229       135        95
VIS    2025250     91400   19.7800 -114.6700       7.0       242       141        97
VIS    2025250     91400   19.7600 -114.7400       6.4       240       161        96
VIS    2025250     91400   19.7300 -115.7300       7.0       165       181        99
VIS    2025250     91400   19.7300 -115.7600       5.6       165       174        99
VIS    2025250     91400   19.7300 -115.7900       4.8       165       170        95
VIS    2025250     91400   19.7300 -115.8200       7.0       148       142        95
VIS    2025250     91400   19.7300 -115.8500       6.0       151       138       100
VIS    2025250     91400   19.7300 -115.8800       6.4       161       136       100
VIS    2025250     91400   19.7300 -115.9200       6.5       156       138        97
VIS    2025250     91400   19.7400 -115.9300       6.2       153       139        98
VIS    2025250     91400   19.7300 -115.9800       7.4       167       145       100
VIS    2025250     91400   19.7400 -116.0100       8.5       165       143       100
VIS    2025250     91400   19.7400 -116.0200       8.6       165       143       100
VIS    2025250     91400   19.7400 -116.0600       8.1       157       141        99
VIS    2025250     91400   19.7400 -116.0800       7.3       156       141        95
VIS    2025250     91400   19.7200 -116.1200       5.7       163       143        98
VIS    2025250     91400   19.7400 -116.1400       6.1       165       143        98
VIS    2025250     91400   19.7300 -116.1800       7.5       165       146       100
VIS    2025250     91400   19.7400 -116.2100       8.5       168       147        98
VIS    2025250     91400   19.7200 -116.2300       8.2       178       150        95
VIS    2025250     91400   19.7100 -116.2400       7.9       183       150        95
VIS    2025250     91400   19.7100 -116.2800       7.7       189       160       100
VIS    2025250     91400   19.7300 -116.3200       8.2       190       176       100
VIS    2025250     91400   19.7300 -116.3200       8.1       190       176       100
VIS    2025250     91400   19.7300 -116.3600       6.8       193       171        99
VIS    2025250     91400   19.7100 -116.3800       6.3       194       171        94
VIS    2025250     91400   19.7200 -116.4100       5.5       198       179        97
VIS    2025250     91400   19.7200 -116.4400       4.7       209       177        99
VIS    2025250     91400   19.6900 -117.6400       4.1        40       145        95
VIS    2025250     91400   19.6800 -117.7200       4.1        88       140        98
VIS    2025250     91400   19.6800 -117.7500       5.3        86       142        98
VIS    2025250     91400   19.6900 -117.7700       4.9        88       146        93
VIS    2025250     91400   19.6700 -117.9200       4.6        76       141        99
VIS    2025250     91400   19.6700 -117.9500       4.2        81       138       100
VIS    2025250     91400   19.6700 -117.9800       4.0        81       137       100
VIS    2025250     91400   19.6800 -118.0700       4.4        97       136       100
VIS    2025250     91400   19.6600 -118.1200       4.1        94       141        93
VIS    2025250     91400   19.6800 -118.1300       4.7       104       141        99
VIS    2025250     91400   19.6800 -118.1500       4.4       101       142        99
VIS    2025250     91400   19.6800 -118.1900       4.5        96       147        99
VIS    2025250     91400   19.6800 -118.2200       4.7        88       153        96
VIS    2025250     91400   19.6600 -118.2400       4.0        73       159        99
VIS    2025250     91400   19.6600 -118.2800       4.8        52       164        97
VIS    2025250     91400   19.6600 -118.2900       4.8        56       164        95
VIS    2025250     91400   19.6600 -118.3400       6.1        51       166        95
VIS    2025250     91400   19.6600 -118.4200       6.9        46       164        99
VIS    2025250     91400   19.6500 -118.6800      11.2        64       164       100
VIS    2025250     91400   19.6500 -118.7100      10.6        67       164       100
VIS    2025250     91400   19.6500 -118.7300       9.9        67       165        99
VIS    2025250     91400   19.6500 -118.7600       8.8        62       165        97
VIS    2025250     91400   19.6600 -118.7800       8.3        59       166        97
VIS    2025250     91400   19.6500 -118.8100       8.1        53       160       100
VIS    2025250     91400   19.6400 -118.8600       8.5        48       158       100
VIS    2025250     91400   19.6600 -118.8700       8.6        46       162        99
VIS    2025250     91400   19.6400 -118.9000       8.6        46       166        96
VIS    2025250     91400   19.6400 -119.0200       7.0        33       166        97
VIS    2025250     91400   19.6500 -119.0600       8.3        49       161       100
VIS    2025250     91400   19.6500 -119.0900       8.1        41       166       100
VIS    2025250     91400   19.6600 -119.1100       8.0        33       170        94
VIS    2025250     91400   19.9300 -108.7700       5.2       117       170       100
VIS    2025250     91400   19.9500 -108.8000       6.5       116       169        99
VIS    2025250     91400   19.9500 -108.8100       6.7       121       164        97
VIS    2025250     91400   19.9200 -108.8500       7.7       123       160        98
VIS    2025250     91400   19.9200 -108.9000       7.5       133       167        95
VIS    2025250     91400   19.8900 -109.9800       5.7        58       180        95
VIS    2025250     91400   19.8800 -110.0100       6.0        57       180        98
VIS    2025250     91400   19.9000 -110.0400       6.4        50       179        95
VIS    2025250     91400   19.8800 -110.0600       6.3        40       182        97
VIS    2025250     91400   19.8800 -110.0900       6.4        33       185        99
VIS    2025250     91400   19.8100 -112.1000       6.5       104       153        99
VIS    2025250     91400   19.8100 -112.1100       6.6       106       153       100
VIS    2025250     91400   19.8300 -112.1800       5.7       104       151        96
VIS    2025250     91400   19.8200 -112.2700       5.1       119       143        99
VIS    2025250     91400   19.8200 -112.2800       5.0       122       140        97
VIS    2025250     91400   19.7900 -112.7700       8.6       116       126        99
VIS    2025250     91400   19.8100 -112.8000       8.8       113       123        97
VIS    2025250     91400   19.7900 -112.8200       9.1       111       125        98
VIS    2025250     91400   19.8000 -112.8400       8.9       115       123        90
VIS    2025250     91400   19.7900 -112.8800       9.2       121       123        97
VIS    2025250     91400   19.8000 -113.1600       9.4       144       116       100
VIS    2025250     91400   19.7900 -113.2000       9.4       146       116        98
VIS    2025250     91400   19.7700 -113.4000      11.1       115       103        95
VIS    2025250     91400   19.7800 -113.5100      19.0       164       104        92
VIS    2025250     91400   19.7800 -113.5100      19.0       164       104        92
VIS    2025250     91400   19.7700 -113.7100       4.8       183       103        92
VIS    2025250     91400   19.7800 -113.7200       4.9       182       103        95
VIS    2025250     91400   19.7600 -113.8000       8.3       175       104        99
VIS    2025250     91400   19.7700 -113.8800       6.8       167       105        95
VIS    2025250     91400   19.7500 -114.1200      10.5       167       109        97
VIS    2025250     91400   19.7600 -114.1500      11.5       188       113       100
VIS    2025250     91400   19.7700 -114.1700      10.6       190       113        95
VIS    2025250     91400   19.7700 -114.2000       9.3       186       114       100
VIS    2025250     91400   19.7700 -114.2500       8.6       197       116        95
VIS    2025250     91400   19.7500 -114.3500       4.9       239       121        94
VIS    2025250     91400   19.7600 -114.3700       5.7       230       122        95
VIS    2025250     91400   19.7500 -114.4500       6.7       216       124        95
VIS    2025250     91400   19.7400 -114.4700       5.5       220       125        92
VIS    2025250     91400   19.7400 -114.5000       4.7       220       125        99
VIS    2025250     91400   19.7500 -114.7500       4.7       231       157        97
VIS    2025250     91400   19.7200 -115.7400       6.9       167       183       100
VIS    2025250     91400   19.7000 -115.7600       5.7       166       176       100
VIS    2025250     91400   19.7000 -115.8000       4.0       163       158        99
VIS    2025250     91400   19.7000 -115.8800       4.3       154       136        99
VIS    2025250     91400   19.7000 -115.9000       4.4       160       135       100
VIS    2025250     91400   19.7100 -115.9100       5.3       162       135        98
VIS    2025250     91400   19.7000 -115.9400       5.6       164       136        97
VIS    2025250     91400   19.7100 -115.9900       7.4       166       142       100
VIS    2025250     91400   19.7200 -116.0200       8.7       166       143       100
VIS    2025250     91400   19.7000 -116.0400       8.6       163       143       100
VIS    2025250     91400   19.7000 -116.0500       8.9       158       143        99
VIS    2025250     91400   19.7000 -116.1000       6.8       157       144       100
VIS    2025250     91400   19.7100 -116.1200       5.7       163       144        99
VIS    2025250     91400   19.7100 -116.1400       5.3       163       145        96
VIS    2025250     91400   19.7100 -116.1800       7.4       170       145       100
VIS    2025250     91400   19.7100 -116.1900       7.7       171       145       100
VIS    2025250     91400   19.7000 -116.2400       7.7       180       150        99
VIS    2025250     91400   19.7100 -116.2500       7.8       184       153        97
VIS    2025250     91400   19.6900 -116.2800       7.6       183       151       100
VIS    2025250     91400   19.6900 -116.3000       8.0       189       170       100
VIS    2025250     91400   19.7100 -116.3500       8.0       199       173       100
VIS    2025250     91400   19.7100 -116.3600       8.0       199       171       100
VIS    2025250     91400   19.6800 -116.4300       4.3       214       184        99
VIS    2025250     91400   19.6800 -116.7700       4.5       183       186        97
VIS    2025250     91400   19.6800 -116.7800       4.4       186       186        92
VIS    2025250     91400   19.6900 -116.8200       4.9       210       186        99
VIS    2025250     91400   19.6700 -117.7600       5.0        83       145        95
VIS    2025250     91400   19.6600 -117.7700       5.4        86       146        97
VIS    2025250     91400   19.6500 -117.8400       5.5        77       143        93
VIS    2025250     91400   19.6500 -117.8800       5.3        71       141        94
VIS    2025250     91400   19.6500 -117.8900       5.1        69       141        95
VIS    2025250     91400   19.6500 -117.9200       4.6        73       139        99
VIS    2025250     91400   19.6500 -117.9500       4.1        78       137       100
VIS    2025250     91400   19.6600 -117.9700       4.1        80       137       100
VIS    2025250     91400   19.6600 -118.0000       4.0        83       136       100
VIS    2025250     91400   19.6500 -118.0300       4.0        85       136       100
VIS    2025250     91400   19.6500 -118.0900       4.0        83       139       100
VIS    2025250     91400   19.6500 -118.2700       4.8        53       164        97
VIS    2025250     91400   19.6500 -118.2900       4.9        52       164        97
VIS    2025250     91400   19.6400 -118.3200       6.1        59       169        94
VIS    2025250     91400   19.6500 -118.3500       6.5        51       167       100
VIS    2025250     91400   19.6400 -118.5700       8.3        63       159        99
VIS    2025250     91400   19.6400 -118.6100       7.9        62       159        96
VIS    2025250     91400   19.6300 -118.6400       7.7        67       162        92
VIS    2025250     91400   19.6300 -118.6900      11.1        63       164       100
VIS    2025250     91400   19.6200 -118.7200      10.5        64       165       100
VIS    2025250     91400   19.6400 -118.7500       9.4        63       165        99
VIS    2025250     91400   19.6400 -118.7500       9.1        63       164        97
VIS    2025250     91400   19.6400 -118.8000       8.3        52       163       100
VIS    2025250     91400   19.6300 -118.8300       8.3        54       158       100
VIS    2025250     91400   19.6200 -118.8600       8.2        51       162       100
VIS    2025250     91400   19.6300 -118.8700       8.2        47       161        99
VIS    2025250     91400   19.6400 -118.8900       8.4        45       165        97
VIS    2025250     91400   19.6200 -119.0500       8.3        57       164        92
VIS    2025250     91400   19.6200 -119.1000       8.6        43       166        97
VIS    2025250     91400   19.6200 -119.1300       8.2        37       165        98
VIS    2025250     91400   19.9200 -108.7600       6.0        99       171        91
VIS    2025250     91400   19.9000 -108.8200       7.5       111       157        98
VIS    2025250     91400   19.9200 -108.8500       7.7       118       158       100
VIS    2025250     91400   19.9200 -108.9000       7.6       131       166        97
VIS    2025250     91400   19.9100 -108.9100       7.5       129       169        94
VIS    2025250     91400   19.8700 -109.9200       9.7        38       181        99
VIS    2025250     91400   19.8700 -109.9500       5.3        69       182        94
VIS    2025250     91400   19.8700 -109.9900       5.8        59       182        99
VIS    2025250     91400   19.8700 -110.0800       6.5        31       188        99
VIS    2025250     91400   19.8000 -112.0900       6.7       106       151        99
VIS    2025250     91400   19.8100 -112.1100       6.6       106       151       100
VIS    2025250     91400   19.7900 -112.1600       6.5       113       148        97
VIS    2025250     91400   19.8000 -112.1700       6.4       112       149        99
VIS    2025250     91400   19.8100 -112.2000       5.7       109       150        99
VIS    2025250     91400   19.7900 -112.2400       5.3       105       149        99
VIS    2025250     91400   19.7800 -112.3700       5.0       121       143        99
VIS    2025250     91400   19.7800 -112.3800       5.0       122       143        97
VIS    2025250     91400   19.7800 -112.7700       8.9       114       129        99
VIS    2025250     91400   19.7900 -112.8100       9.1       112       125       100
VIS    2025250     91400   19.7900 -112.8200       9.2       110       125        99
VIS    2025250     91400   19.7600 -113.6800       7.5       172       104        96
VIS    2025250     91400   19.7500 -113.7400       6.2       175       103        90
VIS    2025250     91400   19.7400 -113.7600       7.4       172       105        98
VIS    2025250     91400   19.7500 -113.7900       8.6       174       104       100
VIS    2025250     91400   19.7600 -113.8000       8.5       173       104       100
VIS    2025250     91400   19.7400 -113.8700       6.8       176       108        94
VIS    2025250     91400   19.7500 -114.1000      10.4       167       109        98
VIS    2025250     91400   19.7500 -114.1300      10.4       167       109        91
VIS    2025250     91400   19.7300 -114.1900       5.7       232       112        96
VIS    2025250     91400   19.7200 -114.3400       5.6       252       116       100
VIS    2025250     91400   19.7200 -114.3800       5.9       249       119        99
VIS    2025250     91400   19.7200 -114.4000       6.6       242       121        99
VIS    2025250     91400   19.7200 -114.4100       7.1       235       123        94
VIS    2025250     91400   19.7400 -114.4600       6.1       219       124        96
VIS    2025250     91400   19.7400 -114.4700       5.5       220       125        94
VIS    2025250     91400   19.7300 -114.5100       4.6       222       126        99
VIS    2025250     91400   19.7300 -114.7400       4.5       220       153        90
VIS    2025250     91400   19.7200 -114.7700       4.0       217       157       100
VIS    2025250     91400   19.7100 -114.7900       4.2       222       158        99
VIS    2025250     91400   19.7000 -115.7600       5.4       166       173       100
VIS    2025250     91400   19.7000 -115.7900       4.3       166       170        99
VIS    2025250     91400   19.7000 -115.8200       4.6       151       146        93
VIS    2025250     91400   19.6900 -115.9300       4.6       165       133        99
VIS    2025250     91400   19.6800 -116.0200       7.9       169       142       100
VIS    2025250     91400   19.6900 -116.0400       8.5       162       142       100
VIS    2025250     91400   19.6700 -116.0800       8.1       152       146        97
VIS    2025250     91400   19.6900 -116.0900       7.3       152       146        99
VIS    2025250     91400   19.6900 -116.1100       6.4       156       148       100
VIS    2025250     91400   19.6700 -116.1500       6.5       159       148        99
VIS    2025250     91400   19.6900 -116.1700       5.9       159       145        98
VIS    2025250     91400   19.6800 -116.2200       8.2       177       150        98
VIS    2025250     91400   19.6800 -116.2200       8.2       177       150        98
VIS    2025250     91400   19.6600 -116.2700       7.5       174       149        98
VIS    2025250     91400   19.6700 -116.3000       8.0       181       151        98
VIS    2025250     91400   19.6800 -116.3100       8.0       187       170        98
VIS    2025250     91400   19.6800 -116.3300       8.2       195       174        99
VIS    2025250     91400   19.6800 -116.3600       8.2       200       174        98
VIS    2025250     91400   19.6600 -116.3900       7.4       196       173        93
VIS    2025250     91400   19.6800 -116.4300       4.3       214       182        97
VIS    2025250     91400   19.6700 -116.4700       4.0       224       184        96
VIS    2025250     91400   19.6600 -116.5000       4.6       208       184        94
VIS    2025250     91400   19.6600 -116.5000       4.5       208       184        96
VIS    2025250     91400   19.6700 -116.7600       5.4       187       185        90
VIS    2025250     91400   19.6700 -116.8000       5.1       200       185        91
VIS    2025250     91400   19.6300 -117.8500       5.7        77       142        98
VIS    2025250     91400   19.6200 -117.8700       6.1        75       141       100
VIS    2025250     91400   19.6200 -117.8900       5.9        71       139       100
VIS    2025250     91400   19.6300 -117.9200       4.7        70       137        98
VIS    2025250     91400   19.6200 -117.9600       4.5        69       134        97
VIS    2025250     91400   19.6200 -117.9900       4.2        75       134       100
VIS    2025250     91400   19.6300 -118.0100       4.3        80       136       100
VIS    2025250     91400   19.6200 -118.0500       4.2        80       138       100
VIS    2025250     91400   19.6200 -118.0700       4.1        77       143       100
VIS    2025250     91400   19.6100 -118.0800       4.1        74       143       100
VIS    2025250     91400   19.6100 -118.2800       4.6        53       172        99
VIS    2025250     91400   19.6300 -118.3000       5.1        50       170       100
VIS    2025250     91400   19.6100 -118.5700      10.1        56       159        97
VIS    2025250     91400   19.6100 -118.5700       9.9        59       159        98
VIS    2025250     91400   19.6100 -118.6000       8.7        65       159        92
VIS    2025250     91400   19.6100 -118.6400       8.2        64       160        93
VIS    2025250     91400   19.6100 -118.6700      10.4        64       165        96
VIS    2025250     91400   19.6000 -118.6900      10.8        61       166        94
VIS    2025250     91400   19.6100 -118.7100      11.1        62       166        99
VIS    2025250     91400   19.6200 -118.7300      10.6        62       166        99
VIS    2025250     91400   19.6000 -118.7800       9.6        48       166        98
VIS    2025250     91400   19.6000 -118.8100       9.1        48       163       100
VIS    2025250     91400   19.6100 -118.8300       8.3        54       158       100
VIS    2025250     91400   19.6100 -118.8600       8.1        51       161        99
VIS    2025250     91400   19.6100 -118.8700       8.1        50       162        99
VIS    2025250     91400   19.5900 -119.1000       8.9        35       169        99
VIS    2025250     91400   19.6000 -119.1200       8.8        33       167        99
VIS    2025250     91400   19.8800 -108.7200       4.8        88       175        99
VIS    2025250     91400   19.8900 -108.8600       7.7       114       158        99
VIS    2025250     91400   19.8900 -108.9000       7.6       125       168       100
VIS    2025250     91400   19.8700 -108.9300       7.8       125       172        99
VIS    2025250     91400   19.8400 -109.8600       8.5        37       182        91
VIS    2025250     91400   19.7700 -112.0300       6.8       123       148        92
VIS    2025250     91400   19.7800 -112.0800       6.7       116       146       100
VIS    2025250     91400   19.7700 -112.1000       6.1       118       147       100
VIS    2025250     91400   19.7800 -112.1300       7.1       112       147        98
VIS    2025250     91400   19.7800 -112.1500       7.1       112       148        97
VIS    2025250     91400   19.7600 -112.2000       7.2       112       146        99
VIS    2025250     91400   19.7600 -112.2100       6.8       112       146        98
VIS    2025250     91400   19.7600 -112.3000       6.2       130       149        90
VIS    2025250     91400   19.7700 -112.3300       5.8       129       149        95
VIS    2025250     91400   19.7700 -112.3600       5.2       121       143       100
VIS    2025250     91400   19.7800 -112.3800       5.0       121       143        98
VIS    2025250     91400   19.7500 -112.7400       8.4       111       137       100
VIS    2025250     91400   19.7600 -112.7800       9.8       114       130       100
VIS    2025250     91400   19.7600 -112.7900       9.8       114       130       100
VIS    2025250     91400   19.7500 -113.2800       8.6       112       110        90
VIS    2025250     91400   19.7300 -113.6900       7.7       168       104       100
VIS    2025250     91400   19.7300 -113.7100       6.2       167       104        90
VIS    2025250     91400   19.7100 -113.7500       7.1       170       104       100
VIS    2025250     91400   19.7300 -113.7700       8.0       170       105        99
VIS    2025250     91400   19.7200 -113.8000       8.0       169       105       100
VIS    2025250     91400   19.7200 -113.8200       8.0       170       105        99
VIS    2025250     91400   19.7200 -113.8500       7.7       173       107        99
VIS    2025250     91400   19.7100 -113.8800       7.3       174       107        95
VIS    2025250     91400   19.7000 -114.1800       4.5       230       111        98
VIS    2025250     91400   19.7100 -114.2300       5.4       226       113       100
VIS    2025250     91400   19.7100 -114.2500       5.7       225       114       100
VIS    2025250     91400   19.7100 -114.3500       6.2       254       116       100
VIS    2025250     91400   19.7000 -114.3800       6.6       248       117       100
VIS    2025250     91400   19.7000 -114.3900       6.9       243       117       100
VIS    2025250     91400   19.7100 -114.4200       7.2       235       123        98
VIS    2025250     91400   19.7000 -114.4600       7.7       211       125       100
VIS    2025250     91400   19.7000 -114.4900       5.4       218       125        96
VIS    2025250     91400   19.6900 -114.5300       4.8       234       126        97
VIS    2025250     91400   19.6900 -114.5400       7.1       229       128        90
VIS    2025250     91400   19.6700 -115.7400       7.5       179       180       100
VIS    2025250     91400   19.6600 -115.7800       5.7       180       170       100
VIS    2025250     91400   19.6700 -115.7900       5.9       173       160        94
VIS    2025250     91400   19.6600 -115.9200       4.1       163       133        99
VIS    2025250     91400   19.6600 -116.0500       8.2       162       143       100
VIS    2025250     91400   19.6600 -116.0800       8.2       152       147        98
VIS    2025250     91400   19.6500 -116.1100       7.6       157       149        99
VIS    2025250     91400   19.6500 -116.1400       7.5       165       148       100
VIS    2025250     91400   19.6500 -116.1500       7.2       162       148       100
VIS    2025250     91400   19.6400 -116.2000       7.8       166       148       100
VIS    2025250     91400   19.6500 -116.2200       8.3       170       151       100
VIS    2025250     91400   19.6400 -116.2500       7.7       169       149       100
VIS    2025250     91400   19.6500 -116.2700       7.6       172       148        96
VIS    2025250     91400   19.6500 -116.2900       7.9       173       145        97
VIS    2025250     91400   19.6400 -116.3200       7.8       175       140        98
VIS    2025250     91400   19.6500 -116.3500       8.0       194       170        99
VIS    2025250     91400   19.6400 -116.3900       7.4       197       172        99
VIS    2025250     91400   19.6500 -116.4000       7.1       196       176        97
VIS    2025250     91400   19.6400 -116.4300       6.4       196       182        95
VIS    2025250     91400   19.6500 -116.4600       4.4       217       185        98
VIS    2025250     91400   19.6300 -116.7200       4.4       196       180       100
VIS    2025250     91400   19.6200 -116.7800       5.4       196       182        99
VIS    2025250     91400   19.6200 -116.7900       4.7       195       184        99
VIS    2025250     91400   19.6300 -116.8200       4.1       193       185        97
VIS    2025250     91400   19.6000 -117.8600       6.4        71       142       100
VIS    2025250     91400   19.6000 -117.8800       6.5        68       141       100
VIS    2025250     91400   19.6000 -117.8900       6.4        67       141        99
VIS    2025250     91400   19.6100 -117.9200       5.7        62       139        95
VIS    2025250     91400   19.6000 -117.9600       5.2        66       134        98
VIS    2025250     91400   19.6000 -118.0000       4.7        68       134        99
VIS    2025250     91400   19.6000 -118.0100       4.7        65       136       100
VIS    2025250     91400   19.5900 -118.0300       4.5        62       138       100
VIS    2025250     91400   19.6000 -118.0600       4.1        73       141       100
VIS    2025250     91400   19.6000 -118.2900       4.4        49       175        95
VIS    2025250     91400   19.6000 -118.3000       4.0        47       175        93
VIS    2025250     91400   19.5800 -118.5400       7.0        53       169        96
VIS    2025250     91400   19.6000 -118.5700      10.1        56       162        95
VIS    2025250     91400   19.5700 -118.6000      10.6        53       164       100
VIS    2025250     91400   19.5800 -118.6100      10.3        54       164       100
VIS    2025250     91400   19.5700 -118.6300      10.5        56       162       100
VIS    2025250     91400   19.5700 -118.6600      10.2        62       161        97
VIS    2025250     91400   19.5800 -118.6900      10.7        61       166        96
VIS    2025250     91400   19.5900 -118.7200      10.9        61       166        98
VIS    2025250     91400   19.5800 -118.7900      10.1        47       167        97
VIS    2025250     91400   19.5800 -118.8000      10.2        47       167        99
VIS    2025250     91400   19.5900 -118.8400       8.6        51       162        98
VIS    2025250     91400   19.8700 -108.7100       4.9        88       175        98
VIS    2025250     91400   19.8700 -108.7500       4.9        88       166        91
VIS    2025250     91400   19.8500 -108.8000       8.8       107       161        97
VIS    2025250     91400   19.8500 -108.8100       9.2       108       161       100
VIS    2025250     91400   19.8500 -108.8900       6.9       126       168        91
VIS    2025250     91400   19.8500 -108.9200       7.5       127       179        97
VIS    2025250     91400   19.8500 -108.9300       7.7       127       185       100
VIS    2025250     91400   19.8300 -109.8600       8.7        38       182        94
VIS    2025250     91400   19.7400 -112.0500       5.6       122       148        98
VIS    2025250     91400   19.7400 -112.0600       5.7       120       148        95
VIS    2025250     91400   19.7400 -112.1000       6.0       116       146        99
VIS    2025250     91400   19.7400 -112.1200       6.1       116       148       100
VIS    2025250     91400   19.7400 -112.1600       6.3       114       150       100
VIS    2025250     91400   19.7600 -112.1900       7.2       111       146        99
VIS    2025250     91400   19.7300 -112.2200       6.2       114       147        99
VIS    2025250     91400   19.7300 -112.2400       5.9       120       146        99
VIS    2025250     91400   19.7300 -112.2700       6.4       127       146        99
VIS    2025250     91400   19.7400 -112.3000       6.6       128       148       100
VIS    2025250     91400   19.7400 -112.3200       6.7       128       148        98
VIS    2025250     91400   19.7300 -112.3600       5.6       121       146        95
VIS    2025250     91400   19.7400 -112.4000       4.1       105       143       100
VIS    2025250     91400   19.7200 -112.7800       9.2       111       133        92
VIS    2025250     91400   19.7400 -112.8100      10.1       113       133       100
VIS    2025250     91400   19.7000 -113.3900      11.4       125       103       100
VIS    2025250     91400   19.7000 -113.8000       6.5       171       105        92
VIS    2025250     91400   19.6900 -113.8100       6.0       172       107        92
VIS    2025250     91400   19.7000 -113.8800       7.9       172       107        99
VIS    2025250     91400   19.6900 -114.1400       4.5       210       110        91
VIS    2025250     91400   19.6700 -114.1800       4.3       227       111        99
VIS    2025250     91400   19.6700 -114.2100       4.6       227       111       100
VIS    2025250     91400   19.6700 -114.2200       5.0       230       111       100
VIS    2025250     91400   19.6700 -114.2500       5.5       236       111        99
VIS    2025250     91400   19.6900 -114.2900       5.2       241       116        90
VIS    2025250     91400   19.6700 -114.3600       7.5       247       115        94
VIS    2025250     91400   19.6900 -114.3700       7.5       245       115        93
VIS    2025250     91400   19.6800 -114.4000       7.7       242       117        96
VIS    2025250     91400   19.6700 -114.4300       7.5       241       123        99
VIS    2025250     91400   19.6600 -114.5200       4.9       227       126        95
VIS    2025250     91400   19.6800 -114.5500       7.0       229       128        91
VIS    2025250     91400   19.6400 -115.7500       5.1       188       175        99
VIS    2025250     91400   19.6300 -115.8100       5.6       176       152        95
VIS    2025250     91400   19.6200 -115.9100       4.4       165       134       100
VIS    2025250     91400   19.6300 -115.9300       4.5       167       134       100
VIS    2025250     91400   19.6400 -115.9500       4.3       168       135       100
VIS    2025250     91400   19.6300 -116.0500       9.0       167       146        93
VIS    2025250     91400   19.6400 -116.0700       8.7       161       146        97
VIS    2025250     91400   19.6300 -116.1100       7.5       165       151        99
VIS    2025250     91400   19.6400 -116.1400       7.8       168       149       100
VIS    2025250     91400   19.6400 -116.1600       7.8       168       148       100
VIS    2025250     91400   19.6300 -116.1900       7.8       167       148       100
VIS    2025250     91400   19.6200 -116.2200       7.8       167       152       100
VIS    2025250     91400   19.6100 -116.2300       7.6       169       152       100
VIS    2025250     91400   19.6200 -116.2700       7.6       168       144       100
VIS    2025250     91400   19.6300 -116.2900       7.4       170       136       100
VIS    2025250     91400   19.6300 -116.3100       6.8       174       136        98
VIS    2025250     91400   19.6200 -116.3400       6.5       186       136       100
VIS    2025250     91400   19.6200 -116.3900       7.3       203       154        99
VIS    2025250     91400   19.6100 -116.4000       7.2       204       154        99
VIS    2025250     91400   19.6100 -116.4400       6.7       202       181        99
VIS    2025250     91400   19.6100 -116.4500       7.0       197       181        99
VIS    2025250     91400   19.6000 -116.5500      14.8       197       183        99
VIS    2025250     91400   19.6000 -116.7800       7.1       202       185        94
VIS    2025250     91400   19.5800 -117.5100       6.2       163       177        91
VIS    2025250     91400   19.5800 -117.8100       7.2        67       151        90
VIS    2025250     91400   19.5700 -117.8400       6.9        64       152        94
VIS    2025250     91400   19.5700 -117.8800       6.9        61       150        98
VIS    2025250     91400   19.5900 -117.9000       6.5        62       142        97
VIS    2025250     91400   19.5800 -117.9300       6.2        59       141        98
VIS    2025250     91400   19.5800 -117.9500       5.8        60       140       100
VIS    2025250     91400   19.5700 -117.9900       5.7        60       138        98
VIS    2025250     91400   19.5600 -118.0200       5.2        58       138       100
VIS    2025250     91400   19.5600 -118.0300       5.1        57       138       100
VIS    2025250     91400   19.5800 -118.0700       4.2        65       144       100
VIS    2025250     91400   19.5800 -118.1000       4.3        74       147        99
VIS    2025250     91400   19.5700 -118.5400       6.7        50       170        96
VIS    2025250     91400   19.5700 -118.5900      11.0        55       164        98
VIS    2025250     91400   19.5700 -118.6100      10.5        54       164       100
VIS    2025250     91400   19.5500 -118.6500      10.8        55       159       100
VIS    2025250     91400   19.5700 -118.6600      10.2        60       160        99
VIS    2025250     91400   19.5600 -118.7000      10.9        63       163        92
VIS    2025250     91400   19.5500 -118.7600       8.5        51       166        94
VIS    2025250     91400   19.5500 -118.8100      10.8        45       169        95
VIS    2025250     91400   19.8300 -108.6700       7.9        83       180        99
VIS    2025250     91400   19.8300 -108.7000       7.9        89       171        96
VIS    2025250     91400   19.8300 -108.7400       6.6        92       170        99
VIS    2025250     91400   19.8500 -108.8000       8.9       108       161        95
VIS    2025250     91400   19.8400 -108.8100       9.5       111       162        99
VIS    2025250     91400   19.8200 -108.9000       6.8       125       179        91
VIS    2025250     91400   19.7400 -112.0400       5.7       122       148        96
VIS    2025250     91400   19.7100 -112.0700       5.8       119       145        93
VIS    2025250     91400   19.7200 -112.0800       6.0       119       145        93
VIS    2025250     91400   19.7100 -112.1300       7.0       117       147        99
VIS    2025250     91400   19.7300 -112.1600       6.7       110       150        99
VIS    2025250     91400   19.7300 -112.1600       7.0       109       150        98
VIS    2025250     91400   19.7100 -112.2200       6.5       117       150        98
VIS    2025250     91400   19.7100 -112.2500       6.3       125       145       100
VIS    2025250     91400   19.7100 -112.2600       6.3       125       145       100
VIS    2025250     91400   19.7300 -112.2900       6.4       126       147       100
VIS    2025250     91400   19.7100 -112.3200       6.4       124       148       100
VIS    2025250     91400   19.7200 -112.3700       5.7       121       146        93
VIS    2025250     91400   19.7100 -112.4000       5.2       112       148        96
VIS    2025250     91400   19.7100 -112.7800       9.1       110       133        92
VIS    2025250     91400   19.7100 -112.7800       9.3       113       133        93
VIS    2025250     91400   19.7000 -112.9600       7.2       132       125        95
VIS    2025250     91400   19.6900 -112.9700       7.1       134       125       100
VIS    2025250     91400   19.6900 -113.2200       7.4       109       116        91
VIS    2025250     91400   19.6800 -113.6200       5.6       175       103        96
VIS    2025250     91400   19.6600 -113.8500      10.5       185       109        92
VIS    2025250     91400   19.6600 -113.8800      11.4       185       107        94
VIS    2025250     91400   19.6500 -114.1500       5.0       218       109        98
VIS    2025250     91400   19.6500 -114.1500       5.0       219       109        99
VIS    2025250     91400   19.6500 -114.2100       4.6       224       110        98
VIS    2025250     91400   19.6700 -114.2100       4.7       225       111       100
VIS    2025250     91400   19.6700 -114.2400       5.3       234       111        99
VIS    2025250     91400   19.6600 -114.2700       6.2       252       112        90
VIS    2025250     91400   19.6500 -114.3400       6.5       255       115        92
VIS    2025250     91400   19.6400 -114.3700       6.9       253       115        95
VIS    2025250     91400   19.6600 -114.4000       7.5       247       116       100
VIS    2025250     91400   19.6400 -114.4800       7.8       238       127       100
VIS    2025250     91400   19.6600 -114.5900       8.4       233       130        97
VIS    2025250     91400   19.6500 -114.7500       4.6       286       149        98
VIS    2025250     91400   19.6200 -115.7800       4.4       180       162       100
VIS    2025250     91400   19.6000 -115.8900       4.2       163       137       100
VIS    2025250     91400   19.6200 -115.9100       4.4       166       135       100
VIS    2025250     91400   19.6200 -115.9400       4.3       169       136        94
VIS    2025250     91400   19.6000 -116.0900       6.9       178       152       100
VIS    2025250     91400   19.5900 -116.1200       7.2       176       152       100
VIS    2025250     91400   19.6000 -116.1400       7.7       173       152       100
VIS    2025250     91400   19.6100 -116.1900       8.0       169       153       100
VIS    2025250     91400   19.6100 -116.2100       7.5       169       153       100
VIS    2025250     91400   19.6000 -116.2200       7.4       170       152       100
VIS    2025250     91400   19.6000 -116.2600       6.9       165       144        97
VIS    2025250     91400   19.5900 -116.3000       5.1       165       132        99
VIS    2025250     91400   19.6000 -116.3100       5.5       168       133        99
VIS    2025250     91400   19.6000 -116.3300       5.6       176       133       100
VIS    2025250     91400   19.5800 -116.3900       7.1       209       138        99
VIS    2025250     91400   19.5800 -116.4100       7.4       210       138        97
VIS    2025250     91400   19.5800 -116.4300       7.0       210       154        97
VIS    2025250     91400   19.5900 -116.4700       7.1       198       181        97
VIS    2025250     91400   19.5800 -116.4800       7.0       203       183        99
VIS    2025250     91400   19.6000 -116.6700       6.0       214       177        92
VIS    2025250     91400   19.5800 -116.7100       6.7       195       177        99
VIS    2025250     91400   19.5900 -116.7300       6.1       190       177        98
VIS    2025250     91400   19.5900 -116.7600       6.6       199       184        95
VIS    2025250     91400   19.5700 -116.9000       5.5       170       184        98
VIS    2025250     91400   19.5800 -116.9200       4.3       164       186        99
VIS    2025250     91400   19.5500 -117.8200       7.0        64       154        94
VIS    2025250     91400   19.5600 -117.8400       6.9        64       152        94
VIS    2025250     91400   19.5600 -117.8500       6.8        63       151        96
VIS    2025250     91400   19.5400 -117.8900       6.8        59       150        99
VIS    2025250     91400   19.5400 -117.9200       6.4        56       148       100
VIS    2025250     91400   19.5400 -117.9600       6.4        57       143       100
VIS    2025250     91400   19.5500 -117.9800       6.2        57       141       100
VIS    2025250     91400   19.5500 -118.0100       5.5        59       138        99
VIS    2025250     91400   19.5600 -118.0300       5.2        57       138       100
VIS    2025250     91400   19.5500 -118.0500       5.2        57       140       100
VIS    2025250     91400   19.5400 -118.0900       4.6        71       140       100
VIS    2025250     91400   19.5500 -118.1000       4.7        76       146        98
VIS    2025250     91400   19.5500 -118.1500       4.3        83       157        91
VIS    2025250     91400   19.5300 -118.4900       4.4        38       176        93
VIS    2025250     91400   19.5300 -118.6300      11.7        51       159       100
VIS    2025250     91400   19.5400 -118.6600      10.9        52       159       100
VIS    2025250     91400   19.5300 -118.6900      10.4        48       160        95
VIS    2025250     91400   19.5300 -118.7100      10.3        47       163        95
VIS    2025250     91400   19.8200 -108.6700       7.6        85       179        98
VIS    2025250     91400   19.8100 -108.7000       7.6        91       171        92
VIS    2025250     91400   19.8200 -108.8600       5.5       117       168        90
VIS    2025250     91400   19.8000 -108.9000       6.7       125       188        96
VIS    2025250     91400   19.6900 -112.0500       4.9       109       149        96
VIS    2025250     91400   19.6900 -112.0600       4.9       111       148        96
VIS    2025250     91400   19.7000 -112.1000       6.7       118       143        91
VIS    2025250     91400   19.6900 -112.1200       7.8       117       144        94
VIS    2025250     91400   19.6900 -112.1500       7.4       112       148       100
VIS    2025250     91400   19.7000 -112.1800       6.8       108       151        99
VIS    2025250     91400   19.7000 -112.2200       6.6       117       151        98
VIS    2025250     91400   19.7000 -112.2500       6.2       124       144       100
VIS    2025250     91400   19.6900 -112.2600       6.2       123       143       100
VIS    2025250     91400   19.6900 -112.3100       5.7       119       147       100
VIS    2025250     91400   19.6900 -112.3200       5.9       121       148       100
VIS    2025250     91400   19.6800 -112.3700       6.2       115       150        98
VIS    2025250     91400   19.6900 -112.3800       6.5       120       149        92
VIS    2025250     91400   19.6700 -112.7600       7.4       119       139        99
VIS    2025250     91400   19.6700 -112.7600       7.6       122       139        99
VIS    2025250     91400   19.6800 -112.9700       7.0       133       125       100
VIS    2025250     91400   19.6600 -113.5700       5.5       155       103        90
VIS    2025250     91400   19.6600 -113.6200       5.9       179       103        94
VIS    2025250     91400   19.6600 -113.6500       6.0       177       103       100
VIS    2025250     91400   19.6500 -113.8400      10.3       185       109        91
VIS    2025250     91400   19.6500 -113.8800      11.4       184       107        96
VIS    2025250     91400   19.6300 -113.9100      10.7       187       104        98
VIS    2025250     91400   19.6500 -113.9400      10.7       185       104        90
VIS    2025250     91400   19.6200 -114.1100       4.7       217       107        91
VIS    2025250     91400   19.6400 -114.1400       5.2       217       109        99
VIS    2025250     91400   19.6400 -114.1500       5.1       218       109        99
VIS    2025250     91400   19.6400 -114.1900       4.7       224       110       100
VIS    2025250     91400   19.6300 -114.2900       5.9       275       114        99
VIS    2025250     91400   19.6200 -114.3200       5.6       270       114       100
VIS    2025250     91400   19.6300 -114.3400       6.0       266       114        98
VIS    2025250     91400   19.6300 -114.3600       6.2       264       114        91
VIS    2025250     91400   19.6300 -114.3900       7.0       258       116        94
VIS    2025250     91400   19.6200 -114.4300       7.2       252       123       100
VIS    2025250     91400   19.6200 -114.4800       8.0       242       128       100
VIS    2025250     91400   19.6100 -114.5000       8.0       249       128        99
VIS    2025250     91400   19.6100 -114.7400       7.0       269       145        95
VIS    2025250     91400   19.6100 -114.7700       6.6       272       146        92
VIS    2025250     91400   19.5800 -115.7200       8.2       176       179        99
VIS    2025250     91400   19.6000 -115.7400       5.4       176       171       100
VIS    2025250     91400   19.5800 -115.7500       7.0       174       171        99
VIS    2025250     91400   19.5900 -115.8700       4.1       163       138        91
VIS    2025250     91400   19.5900 -115.8900       4.2       162       138        96
VIS    2025250     91400   19.5800 -116.0000       5.0       175       140        96
VIS    2025250     91400   19.5800 -116.0000       5.2       175       140        96
VIS    2025250     91400   19.5600 -116.1900       6.6       170       149       100
VIS    2025250     91400   19.5700 -116.2200       6.9       173       149       100
VIS    2025250     91400   19.5600 -116.2500       5.6       166       137        90
VIS    2025250     91400   19.5800 -116.2700       5.9       159       136        90
VIS    2025250     91400   19.5800 -116.3000       4.9       163       131        99
VIS    2025250     91400   19.5700 -116.3300       4.9       172       130       100
VIS    2025250     91400   19.5700 -116.3400       5.0       177       130       100
VIS    2025250     91400   19.5800 -116.3900       7.0       209       137       100
VIS    2025250     91400   19.5800 -116.4000       7.3       211       138        98
VIS    2025250     91400   19.5600 -116.4300       6.0       214       148        98
VIS    2025250     91400   19.5600 -116.4500       5.5       213       155        98
VIS    2025250     91400   19.5800 -116.4800       6.6       206       183       100
VIS    2025250     91400   19.5500 -116.6200      10.6       215       181        99
VIS    2025250     91400   19.5500 -116.6900       9.1       195       178        99
VIS    2025250     91400   19.5600 -116.7100       6.9       195       177       100
VIS    2025250     91400   19.5700 -116.7400       6.4       194       179        99
VIS    2025250     91400   19.5600 -116.9200       5.8       169       187        99
VIS    2025250     91400   19.5500 -117.4100       4.1       140       186        92
VIS    2025250     91400   19.5500 -117.4600       4.9       141       185        95
VIS    2025250     91400   19.5300 -117.8000       6.7        66       158        94
VIS    2025250     91400   19.5200 -117.8100       7.1        65       154        94
VIS    2025250     91400   19.5200 -117.8600       7.3        61       153        99
VIS    2025250     91400   19.5300 -117.8700       7.1        60       151        97
VIS    2025250     91400   19.5300 -117.8900       6.9        58       150        99
VIS    2025250     91400   19.5200 -117.9300       6.6        57       148       100
VIS    2025250     91400   19.5400 -117.9600       6.5        57       143       100
VIS    2025250     91400   19.5300 -117.9900       6.2        59       143       100
VIS    2025250     91400   19.5300 -118.0100       5.6        59       140       100
VIS    2025250     91400   19.5300 -118.0200       5.3        58       139       100
VIS    2025250     91400   19.5300 -118.0600       5.4        55       140       100
VIS    2025250     91400   19.5300 -118.0800       4.7        68       140       100
VIS    2025250     91400   19.5300 -118.1100       4.9        77       146        98
VIS    2025250     91400   19.5100 -118.1900       4.5        59       175       100
VIS    2025250     91400   19.5000 -118.6500      11.3        50       158        99
VIS    2025250     91400   19.5200 -118.6700      10.4        48       159       100
VIS    2025250     91400   19.5100 -118.6900       9.9        48       160        99
VIS    2025250     91400   19.5100 -118.7300       8.4        40       156        92
VIS    2025250     91400   19.5000 -118.7400       8.4        36       156        93
VIS    2025250     91400   19.5000 -118.7700       8.1        37       154        90
VIS    2025250     91400   19.7800 -108.9000       5.9       119       175        99
VIS    2025250     91400   19.6800 -112.0300       5.2       102       152        95
VIS    2025250     91400   19.6800 -112.0600       5.0       111       148        95
VIS    2025250     91400   19.6800 -112.1100       7.5       119       143        91
VIS    2025250     91400   19.6700 -112.1100       7.9       119       143        94
VIS    2025250     91400   19.6800 -112.1500       7.7       112       148       100
VIS    2025250     91400   19.6800 -112.1700       7.0       107       152        96
VIS    2025250     91400   19.6600 -112.2300       6.8       123       152       100
VIS    2025250     91400   19.6600 -112.2300       6.9       123       152       100
VIS    2025250     91400   19.6600 -112.2900       6.0       124       140       100
VIS    2025250     91400   19.6600 -112.3000       5.6       122       140       100
VIS    2025250     91400   19.6400 -112.6900       5.3       119       150        97
VIS    2025250     91400   19.6600 -112.7500       7.6       122       142        96
VIS    2025250     91400   19.6600 -112.7700       7.4       124       142        96
VIS    2025250     91400   19.6600 -112.9700       6.5       135       126        97
VIS    2025250     91400   19.6300 -113.5400       6.4       132       103        99
VIS    2025250     91400   19.6300 -113.5600       4.9       137       103        94
VIS    2025250     91400   19.6200 -113.7800       4.3       204       107        98
VIS    2025250     91400   19.6200 -113.8000       5.2       196       108        96
VIS    2025250     91400   19.6200 -113.8400       7.1       183       108        92
VIS    2025250     91400   19.6100 -114.3200       5.7       272       114       100
VIS    2025250     91400   19.6100 -114.3400       6.0       271       114        96
VIS    2025250     91400   19.6100 -114.4100       7.0       261       116        90
VIS    2025250     91400   19.6100 -114.4400       7.3       254       127       100
VIS    2025250     91400   19.5900 -114.4900       7.8       251       128        99
VIS    2025250     91400   19.5900 -114.5100       8.0       247       128        99
VIS    2025250     91400   19.6000 -114.7400       6.9       268       145        94
VIS    2025250     91400   19.5700 -115.7400       8.1       173       171       100
VIS    2025250     91400   19.5700 -115.7500       8.0       173       171       100
VIS    2025250     91400   19.5700 -115.7900       6.4       163       158        97
VIS    2025250     91400   19.5500 -115.8200       4.1       160       151        99
VIS    2025250     91400   19.5400 -115.9900       4.1       174       142        91
VIS    2025250     91400   19.5600 -116.1900       6.5       170       149       100
VIS    2025250     91400   19.5400 -116.2200       6.2       177       144       100
VIS    2025250     91400   19.5400 -116.3600       4.7       191       130        98
VIS    2025250     91400   19.5500 -116.3800       5.5       204       134        99
VIS    2025250     91400   19.5300 -116.4200       5.0       216       140        97
VIS    2025250     91400   19.5400 -116.4400       4.7       225       154       100
VIS    2025250     91400   19.5500 -116.4500       5.0       220       155        99
VIS    2025250     91400   19.5500 -116.4800       5.4       216       177       100
VIS    2025250     91400   19.5300 -116.5700       4.0       254       184        95
VIS    2025250     91400   19.5400 -116.6400      15.5       201       180        98
VIS    2025250     91400   19.5400 -116.6900       5.2       195       180       100
VIS    2025250     91400   19.5400 -116.7300       5.3       196       180        98
VIS    2025250     91400   19.5200 -117.4300       4.6       159       186        99
VIS    2025250     91400   19.4900 -117.8200       7.4        59       158        96
VIS    2025250     91400   19.5100 -117.8400       7.4        60       154       100
VIS    2025250     91400   19.5100 -117.8600       7.2        59       152       100
VIS    2025250     91400   19.5100 -117.8900       7.0        57       151       100
VIS    2025250     91400   19.5100 -117.9400       6.4        57       149       100
VIS    2025250     91400   19.5100 -117.9400       6.4        58       147       100
VIS    2025250     91400   19.5100 -117.9700       6.3        58       145       100
VIS    2025250     91400   19.4900 -118.0100       5.5        61       144       100
VIS    2025250     91400   19.4900 -118.0300       5.0        62       144       100
VIS    2025250     91400   19.4900 -118.0600       5.0        59       141       100
VIS    2025250     91400   19.4900 -118.0900       5.4        61       145       100
VIS    2025250     91400   19.5100 -118.1100       5.4        70       144        99
VIS    2025250     91400   19.5000 -118.1600       5.6        70       169        94
VIS    2025250     91400   19.4900 -118.1600       5.3        68       170        95
VIS    2025250     91400   19.5000 -118.1900       4.4        54       177       100
VIS    2025250     91400   19.4900 -118.7500       8.5        34       156        95
VIS    2025250     91400   19.4900 -118.7700       8.4        32       154        99
VIS    2025250     91400   19.4700 -118.8200       8.2        39       145       100
VIS    2025250     91400   19.4700 -118.8600       8.7        41       149        95
VIS    2025250     91400   19.7500 -108.7600       6.2        59       169        93
VIS    2025250     91400   19.7700 -108.7800       6.1        73       168        99
VIS    2025250     91400   19.7600 -108.8100       4.2        85       167        98
VIS    2025250     91400   19.7500 -108.8900       4.4        94       169        98
VIS    2025250     91400   19.7700 -108.9000       5.2       111       175       100
VIS    2025250     91400   19.7500 -108.9200       5.7       117       180       100
VIS    2025250     91400   19.7100 -110.0300      10.5         8       779       100
VIS    2025250     91400   19.6400 -112.0300       4.3       103       152        96
VIS    2025250     91400   19.6600 -112.0600       5.6       115       144        94
VIS    2025250     91400   19.6500 -112.1000       7.5       121       141        95
VIS    2025250     91400   19.6400 -112.1100       7.5       119       140        96
VIS    2025250     91400   19.6400 -112.1400       7.8       115       145        98
VIS    2025250     91400   19.6400 -112.1900       6.5       114       154        95
VIS    2025250     91400   19.6500 -112.2100       6.8       118       155       100
VIS    2025250     91400   19.6400 -112.2300       7.2       124       153       100
VIS    2025250     91400   19.6400 -112.2600       6.9       124       137        99
VIS    2025250     91400   19.6400 -112.3000       6.0       126       138       100
VIS    2025250     91400   19.6400 -112.6900       5.3       120       150        99
VIS    2025250     91400   19.6400 -112.7000       5.3       120       150        99
VIS    2025250     91400   19.6200 -112.8900       6.1       131       135        98
VIS    2025250     91400   19.6000 -113.3500       7.2        96       104        95
VIS    2025250     91400   19.5800 -113.8800       6.0       179       105        90
VIS    2025250     91400   19.5700 -114.3800       6.1       266       116        92
VIS    2025250     91400   19.5600 -114.4400       5.1       275       128        93
VIS    2025250     91400   19.5800 -114.4800       7.3       263       129       100
VIS    2025250     91400   19.5700 -114.5000       7.7       251       128        98
VIS    2025250     91400   19.5700 -114.8300      15.0       161       162        95
VIS    2025250     91400   19.5500 -114.8700      11.7       158       158        98
VIS    2025250     91400   19.5300 -115.7100       8.7       168       184       100
VIS    2025250     91400   19.5300 -115.7200       9.2       169       183       100
VIS    2025250     91400   19.5300 -115.7600       7.4       173       171        99
VIS    2025250     91400   19.5500 -115.7900       5.8       163       161       100
VIS    2025250     91400   19.5500 -115.8000       5.4       161       161       100
VIS    2025250     91400   19.5400 -115.8300       4.6       165       153        98
VIS    2025250     91400   19.5300 -115.8600       4.5       172       148        99
VIS    2025250     91400   19.5400 -115.8900       4.2       164       141        96
VIS    2025250     91400   19.5200 -115.9200       4.9       168       141       100
VIS    2025250     91400   19.5300 -115.9500       5.2       170       141       100
VIS    2025250     91400   19.5200 -115.9800       5.8       173       142        95
VIS    2025250     91400   19.5200 -116.0400       5.5       173       148        91
VIS    2025250     91400   19.5300 -116.2100       5.8       169       145        99
VIS    2025250     91400   19.5300 -116.2200       5.5       160       144        97
VIS    2025250     91400   19.5100 -116.2700       4.1       170       125       100
VIS    2025250     91400   19.5100 -116.3300       4.0       195       126       100
VIS    2025250     91400   19.5200 -116.3800       5.1       207       134        97
VIS    2025250     91400   19.5200 -116.3900       5.2       212       135        98
VIS    2025250     91400   19.5100 -116.4200       5.2       219       140        95
VIS    2025250     91400   19.5200 -116.4400       4.5       230       153       100
VIS    2025250     91400   19.5100 -116.4900       4.7       223       173        98
VIS    2025250     91400   19.5200 -116.5800       4.4       261       184        98
VIS    2025250     91400   19.5000 -116.9000       9.0       168       185        99
VIS    2025250     91400   19.4800 -117.4500       5.7       163       184        91
VIS    2025250     91400   19.4900 -117.8300       7.2        63       158        93
VIS    2025250     91400   19.4800 -117.8700       6.9        59       153       100
VIS    2025250     91400   19.4800 -117.9000       6.9        57       152       100
VIS    2025250     91400   19.4800 -117.9300       6.6        55       151       100
VIS    2025250     91400   19.4800 -117.9300       6.5        55       149       100
VIS    2025250     91400   19.4800 -117.9700       6.1        56       147        99
VIS    2025250     91400   19.4700 -118.0100       5.8        58       146       100
VIS    2025250     91400   19.4800 -118.0200       5.5        60       144       100
VIS    2025250     91400   19.4700 -118.0700       5.2        65       145        99
VIS    2025250     91400   19.4800 -118.0700       5.2        64       145       100
VIS    2025250     91400   19.4700 -118.1000       6.6        64       152        99
VIS    2025250     91400   19.4600 -118.1300       6.7        63       168        92
VIS    2025250     91400   19.4700 -118.1800       4.7        48       177        99
VIS    2025250     91400   19.4700 -118.2000       4.1        51       181        98
VIS    2025250     91400   19.4500 -118.6200       4.2       348       170        98
VIS    2025250     91400   19.4700 -118.7700       9.0        40       149        99
VIS    2025250     91400   19.4600 -118.7800       8.7        39       148        99
VIS    2025250     91400   19.4500 -118.8300       8.1        42       145        92
VIS    2025250     91400   19.4500 -118.8600       8.7        41       147        94
VIS    2025250     91400   19.4400 -118.8800       8.8        41       147        98
VIS    2025250     91400   19.4600 -118.8900       8.6        45       164        97
VIS    2025250     91400   19.7400 -108.6400      10.5       104       176        98
VIS    2025250     91400   19.7400 -108.6700       9.6       102       176       100
VIS    2025250     91400   19.7500 -108.7300       5.3        62       169        93
VIS    2025250     91400   19.7200 -108.9000       4.8       101       178       100
VIS    2025250     91400   19.7200 -108.9100       5.0       104       179       100
VIS    2025250     91400   19.7300 -108.9300       5.0       102       180        98
VIS    2025250     91400   19.6800 -110.0500      10.5         8       780       100
VIS    2025250     91400   19.6200 -111.9800       8.4       108       163        93
VIS    2025250     91400   19.6300 -112.0400       4.6       111       150        99
VIS    2025250     91400   19.6300 -112.0800       6.3       118       141        99
VIS    2025250     91400   19.6100 -112.1200       5.9       109       145        99
VIS    2025250     91400   19.6200 -112.1300       6.3       112       146        96
VIS    2025250     91400   19.6100 -112.1700       5.8       111       151        99
VIS    2025250     91400   19.6100 -112.2200       7.0       115       154        99
VIS    2025250     91400   19.6200 -112.2400       7.2       121       153       100
VIS    2025250     91400   19.6200 -112.2700       6.4       119       138       100
VIS    2025250     91400   19.6200 -112.2800       6.4       120       136       100
VIS    2025250     91400   19.6000 -112.8600       6.5       138       140        99
VIS    2025250     91400   19.5900 -112.8700       6.5       137       135        99
VIS    2025250     91400   19.6000 -113.2600       7.6        98       110        97
VIS    2025250     91400   19.5800 -113.2800       8.4       100       109        99
VIS    2025250     91400   19.5800 -113.8800       5.8       179       105        95
VIS    2025250     91400   19.5400 -114.8400      12.9       157       162        93
VIS    2025250     91400   19.5000 -115.6900       9.1       165       185        99
VIS    2025250     91400   19.5200 -115.7100       8.8       167       184       100
VIS    2025250     91400   19.5200 -115.7500       6.7       175       171       100
VIS    2025250     91400   19.5100 -115.7700       5.3       173       165        99
VIS    2025250     91400   19.5000 -115.8100       5.0       159       162        98
VIS    2025250     91400   19.5100 -115.8200       4.9       155       157       100
VIS    2025250     91400   19.5200 -115.8600       5.4       170       148       100
VIS    2025250     91400   19.5200 -115.9000       5.6       168       145       100
VIS    2025250     91400   19.5000 -115.9100       5.9       168       146       100
VIS    2025250     91400   19.5100 -115.9600       5.7       170       142       100
VIS    2025250     91400   19.5200 -115.9600       5.7       170       142       100
VIS    2025250     91400   19.4900 -116.0100       4.9       182       144       100
VIS    2025250     91400   19.5000 -116.0700       6.4       166       152        95
VIS    2025250     91400   19.5000 -116.1100       5.0       179       153        91
VIS    2025250     91400   19.5100 -116.2600       4.3       169       125       100
VIS    2025250     91400   19.4900 -116.2800       4.4       166       125        99
VIS    2025250     91400   19.5000 -116.3000       4.1       172       125        98
VIS    2025250     91400   19.4800 -116.3400       4.0       212       130        98
VIS    2025250     91400   19.5000 -116.3600       4.8       206       130       100
VIS    2025250     91400   19.5000 -116.3800       5.2       212       134        98
VIS    2025250     91400   19.5000 -116.4300       5.2       224       143        94
VIS    2025250     91400   19.5000 -116.4300       4.9       230       148        98
VIS    2025250     91400   19.4800 -116.4800       4.4       234       178        95
VIS    2025250     91400   19.4800 -116.5200       4.2       223       184        99
VIS    2025250     91400   19.4900 -116.5300       4.1       223       186       100
VIS    2025250     91400   19.4900 -116.5900       4.1       260       184        99
VIS    2025250     91400   19.4900 -116.9000       9.2       168       184       100
VIS    2025250     91400   19.4600 -117.2900       4.7       157       186        98
VIS    2025250     91400   19.4700 -117.3200       4.1       151       187       100
VIS    2025250     91400   19.4700 -117.4500       6.8       169       184        96
VIS    2025250     91400   19.4500 -117.7300       5.3       167       168       100
VIS    2025250     91400   19.4600 -117.8600       6.2        54       154        99
VIS    2025250     91400   19.4400 -117.8800       5.8        51       153        99
VIS    2025250     91400   19.4600 -117.9100       6.4        54       152       100
VIS    2025250     91400   19.4500 -117.9400       6.2        51       151        99
VIS    2025250     91400   19.4500 -117.9800       6.1        51       148        99
VIS    2025250     91400   19.4400 -117.9900       6.0        50       148        99
VIS    2025250     91400   19.4600 -118.0300       5.4        56       147        99
VIS    2025250     91400   19.4400 -118.0400       5.2        55       149        99
VIS    2025250     91400   19.4600 -118.0800       5.6        63       151        98
VIS    2025250     91400   19.4600 -118.1000       6.4        61       154        99
VIS    2025250     91400   19.4600 -118.1200       6.7        61       163        96
VIS    2025250     91400   19.4400 -118.1700       4.6        36       174       100
VIS    2025250     91400   19.4500 -118.1800       4.6        39       177       100
VIS    2025250     91400   19.4200 -118.5800       6.9        37       175        98
VIS    2025250     91400   19.4200 -118.7800       9.0        46       149       100
VIS    2025250     91400   19.4300 -118.8400       8.2        43       145        92
VIS    2025250     91400   19.4300 -118.8800       8.7        39       147       100
VIS    2025250     91400   19.4400 -118.8900       8.7        41       147        99
VIS    2025250     91400   19.4300 -118.9300       6.5        40       150       100
VIS    2025250     91400   19.4200 -118.9500       6.6        36       149       100
VIS    2025250     91400   19.7000 -108.6200      12.8        87       172        92
VIS    2025250     91400   19.7000 -108.6300      12.8        88       172        94
VIS    2025250     91400   19.7100 -108.6600      12.3        95       172        97
VIS    2025250     91400   19.7000 -108.9000       5.7       112       175       100
VIS    2025250     91400   19.7100 -108.9100       5.3       108       179       100
VIS    2025250     91400   19.6700 -110.0100      10.4        13       747        94
VIS    2025250     91400   19.6700 -110.0200      10.3        13       746        94
VIS    2025250     91400   19.6100 -111.8900       7.4        98       157        90
VIS    2025250     91400   19.6000 -111.9400       8.5       107       159       100
VIS    2025250     91400   19.6100 -111.9500       8.6       108       159        99
VIS    2025250     91400   19.6100 -111.9800       7.7       111       160        93
VIS    2025250     91400   19.6000 -112.0100       5.8       136       158        99
VIS    2025250     91400   19.5900 -112.0500       5.6       114       154        98
VIS    2025250     91400   19.5900 -112.0900       5.6       100       152        99
VIS    2025250     91400   19.6000 -112.1100       5.5       101       146        99
VIS    2025250     91400   19.6000 -112.1200       5.9       107       147        97
VIS    2025250     91400   19.6000 -112.1600       5.8       111       150        93
VIS    2025250     91400   19.6000 -112.2700       6.4       115       144       100
VIS    2025250     91400   19.5900 -112.2900       5.5       111       144       100
VIS    2025250     91400   19.5700 -112.7200       7.2       129       148        94
VIS    2025250     91400   19.5700 -112.7500       7.0       126       147        98
VIS    2025250     91400   19.5800 -112.8700       7.1       132       138       100
VIS    2025250     91400   19.5700 -112.9000       7.4       129       134        95
VIS    2025250     91400   19.5700 -113.2700       8.3        96       109        99
VIS    2025250     91400   19.5700 -113.3000       7.8        95       107        98
VIS    2025250     91400   19.5400 -113.6000      11.2       177       103        91
VIS    2025250     91400   19.5300 -113.7500       4.3       206       104        95
VIS    2025250     91400   19.5200 -114.4200       5.5       270       126        94
VIS    2025250     91400   19.4800 -115.6900       8.8       161       185        98
VIS    2025250     91400   19.4800 -115.7000       8.2       160       184        95
VIS    2025250     91400   19.5000 -115.7500       5.5       178       171        99
VIS    2025250     91400   19.4800 -115.7800       4.7       168       169       100
VIS    2025250     91400   19.4900 -115.7900       4.7       167       165        99
VIS    2025250     91400   19.4900 -115.8400       5.0       159       154        99
VIS    2025250     91400   19.4800 -115.8500       5.7       165       154       100
VIS    2025250     91400   19.4900 -115.8900       6.4       171       149       100
VIS    2025250     91400   19.4900 -115.9000       6.4       171       148       100
VIS    2025250     91400   19.4900 -115.9500       5.4       171       144       100
VIS    2025250     91400   19.4900 -115.9500       5.6       171       144       100
VIS    2025250     91400   19.4700 -116.0100       5.6       175       144       100
VIS    2025250     91400   19.4700 -116.0500       4.4       168       152        91
VIS    2025250     91400   19.4900 -116.0800       6.5       167       153        96
VIS    2025250     91400   19.4700 -116.1000       5.8       185       153        98
VIS    2025250     91400   19.4600 -116.1700       6.1       178       149        95
VIS    2025250     91400   19.4700 -116.1800       5.5       171       146        91
VIS    2025250     91400   19.4700 -116.2700       4.6       151       136        98
VIS    2025250     91400   19.4800 -116.3400       4.0       216       130        97
VIS    2025250     91400   19.4800 -116.3700       4.6       219       135        99
VIS    2025250     91400   19.4800 -116.4700       4.3       235       178        96
VIS    2025250     91400   19.4500 -116.8700       4.0       164       177        97
VIS    2025250     91400   19.4500 -116.8800       4.2       159       177        98
VIS    2025250     91400   19.4500 -117.0500       4.0       177       182        93
VIS    2025250     91400   19.4400 -117.2200       7.5       150       183       100
VIS    2025250     91400   19.4500 -117.2500       7.1       131       183        97
VIS    2025250     91400   19.4500 -117.3100       5.2       165       186        99
VIS    2025250     91400   19.4300 -117.8600       6.2        54       158        98
VIS    2025250     91400   19.4300 -117.8900       5.7        45       153        99
VIS    2025250     91400   19.4300 -117.8900       5.6        45       153        99
VIS    2025250     91400   19.4200 -117.9400       5.8        43       153        99
VIS    2025250     91400   19.4200 -117.9700       5.9        48       150       100
VIS    2025250     91400   19.4400 -117.9800       6.1        49       149        99
VIS    2025250     91400   19.4200 -118.0100       5.4        46       149        99
VIS    2025250     91400   19.4100 -118.0400       5.1        46       152        99
VIS    2025250     91400   19.4200 -118.0800       5.2        48       154        99
VIS    2025250     91400   19.4100 -118.0900       5.1        47       155        98
VIS    2025250     91400   19.4200 -118.1400       5.5        47       166       100
VIS    2025250     91400   19.4200 -118.1400       5.5        45       168       100
VIS    2025250     91400   19.4300 -118.1700       4.5        33       174       100
VIS    2025250     91400   19.4100 -118.2000       4.0        44       175        93
VIS    2025250     91400   19.4100 -118.5900       8.0        33       170        99
VIS    2025250     91400   19.4100 -118.6000       8.4        35       170        96
VIS    2025250     91400   19.4000 -118.7300       9.8        26       168        98
VIS    2025250     91400   19.4000 -118.7500       9.8        27       168        97
VIS    2025250     91400   19.4000 -118.8300       7.3        56       151        93
VIS    2025250     91400   19.4000 -118.8700       7.7        40       150        96
VIS    2025250     91400   19.4100 -118.9000       8.2        36       150       100
VIS    2025250     91400   19.3900 -118.9100       8.4        37       147        96
VIS    2025250     91400   19.4100 -118.9400       6.7        34       147       100
VIS    2025250     91400   19.4100 -118.9500       6.7        34       149       100
VIS    2025250     91400   19.7000 -108.6300      12.9        88       172        91
VIS    2025250     91400   19.6800 -108.6600      12.9        92       172        97
VIS    2025250     91400   19.6900 -108.7500      12.8        76       171        99
VIS    2025250     91400   19.6900 -108.8100       4.6        53       164        97
VIS    2025250     91400   19.6800 -108.8700       4.7       108       169        95
VIS    2025250     91400   19.6900 -108.9000       5.7       111       170        98
VIS    2025250     91400   19.6900 -108.9400       4.9        93       179        93
VIS    2025250     91400   19.6300 -109.9400      10.2        27       721       100
VIS    2025250     91400   19.6300 -110.1500      10.7        14       765        92
VIS    2025250     91400   19.5800 -111.9200       8.1       105       154        99
VIS    2025250     91400   19.5700 -111.9400       8.4       105       155       100
VIS    2025250     91400   19.5800 -111.9500       8.3       104       157        99
VIS    2025250     91400   19.5600 -112.0100       7.5       105       155       100
VIS    2025250     91400   19.5600 -112.0200       7.5       106       155       100
VIS    2025250     91400   19.5700 -112.0600       6.0       111       154       100
VIS    2025250     91400   19.5600 -112.0700       6.4       109       153        99
VIS    2025250     91400   19.5700 -112.1300       5.8        95       153        98
VIS    2025250     91400   19.5600 -112.7100       7.4       129       148        97
VIS    2025250     91400   19.5600 -112.7200       7.3       129       147        94
VIS    2025250     91400   19.5400 -112.8300       8.6       123       141        99
VIS    2025250     91400   19.5500 -112.8600       8.7       127       140       100
VIS    2025250     91400   19.5400 -112.8900       8.8       130       136        97
VIS    2025250     91400   19.5600 -112.9000       7.8       129       135        96
VIS    2025250     91400   19.5500 -113.0100       6.8       159       127        90
VIS    2025250     91400   19.4900 -114.2500       5.5       280       112        96
VIS    2025250     91400   19.4900 -114.2800       6.3       275       113        97
VIS    2025250     91400   19.5000 -114.3000       6.6       275       113        97
VIS    2025250     91400   19.5000 -114.3300       6.2       270       115        96
VIS    2025250     91400   19.5000 -114.3500       7.4       259       116        98
VIS    2025250     91400   19.5100 -114.4100       6.2       271       126        91
VIS    2025250     91400   19.5100 -114.4300       5.6       276       126        96
VIS    2025250     91400   19.4900 -114.5400       4.0       230       129        97
VIS    2025250     91400   19.4900 -114.5600       4.4       224       129        93
VIS    2025250     91400   19.4900 -114.6500       4.2       255       138        95
VIS    2025250     91400   19.4900 -114.6600       4.3       255       138        90
VIS    2025250     91400   19.4900 -114.8500       4.3       213       160        93
VIS    2025250     91400   19.4600 -115.5400      12.4       153       184       100
VIS    2025250     91400   19.4600 -115.7600       5.2       169       171       100
VIS    2025250     91400   19.4700 -115.7700       4.9       168       170       100
VIS    2025250     91400   19.4600 -115.8000       5.3       164       166        99
VIS    2025250     91400   19.4700 -115.8200       5.7       165       162        99
VIS    2025250     91400   19.4600 -115.8500       6.7       174       155       100
VIS    2025250     91400   19.4600 -115.8900       5.9       176       149        93
VIS    2025250     91400   19.4700 -115.9200       5.9       174       147        97
VIS    2025250     91400   19.4400 -116.0000       5.5       166       145        94
VIS    2025250     91400   19.4600 -116.0600       4.7       169       153        91
VIS    2025250     91400   19.4500 -116.1300       6.1       186       153       100
VIS    2025250     91400   19.4500 -116.1800       6.3       175       149       100
VIS    2025250     91400   19.4400 -116.1900       6.1       174       147       100
VIS    2025250     91400   19.4600 -116.2100       6.0       166       143       100
VIS    2025250     91400   19.4600 -116.2700       4.9       155       136        97
VIS    2025250     91400   19.4400 -116.3200       4.0       186       134        94
VIS    2025250     91400   19.4400 -116.3400       4.4       197       137        95
VIS    2025250     91400   19.4500 -116.5900       4.4       277       182       100
VIS    2025250     91400   19.4100 -117.2400       6.3       154       178        99
VIS    2025250     91400   19.4300 -117.2500       7.0       145       181        99
VIS    2025250     91400   19.4100 -117.2900       5.6       149       181       100
VIS    2025250     91400   19.4000 -117.8200       6.4        55       167        96
VIS    2025250     91400   19.4000 -117.8600       6.0        57       164       100
VIS    2025250     91400   19.3900 -117.8700       5.6        53       164        98
VIS    2025250     91400   19.4000 -117.9200       5.7        45       162        98
VIS    2025250     91400   19.4100 -117.9300       5.7        43       155        99
VIS    2025250     91400   19.3900 -117.9600       5.9        49       153       100
VIS    2025250     91400   19.3900 -117.9900       5.6        46       152       100
VIS    2025250     91400   19.4100 -118.0300       5.2        44       152        99
VIS    2025250     91400   19.4100 -118.0300       5.1        44       152        99
VIS    2025250     91400   19.4000 -118.0700       5.3        45       155        99
VIS    2025250     91400   19.4000 -118.1000       5.0        47       157        98
VIS    2025250     91400   19.3900 -118.1200       5.4        50       164        99
VIS    2025250     91400   19.4100 -118.1400       5.3        48       168       100
VIS    2025250     91400   19.3800 -118.9000       8.4        41       150        99
VIS    2025250     91400   19.3800 -118.9200       8.8        37       145        97
VIS    2025250     91400   19.3700 -118.9400       8.6        35       144        93
VIS    2025250     91400   19.6500 -108.7900       7.5        82       161        97
VIS    2025250     91400   19.6600 -108.8200       6.2        88       159        93
VIS    2025250     91400   19.6500 -108.8300       6.1        96       159        98
VIS    2025250     91400   19.6500 -108.8800       5.2       108       163        99
VIS    2025250     91400   19.6500 -108.8900       5.5       109       163        99
VIS    2025250     91400   19.6100 -109.9500       9.8        27       729        97
VIS    2025250     91400   19.6100 -110.0000      11.2        27       731       100
VIS    2025250     91400   19.6100 -110.0200      10.7        25       729        98
VIS    2025250     91400   19.6200 -110.1300      10.8        17       754        91
VIS    2025250     91400   19.6100 -110.3500      12.2       351       813        94
VIS    2025250     91400   19.5900 -110.3800      12.3       350       810        95
VIS    2025250     91400   19.5700 -111.6300       9.4       106       154        99
VIS    2025250     91400   19.5400 -111.8700       7.9       101       149        90
VIS    2025250     91400   19.5500 -111.9500       8.5       104       152       100
VIS    2025250     91400   19.5500 -111.9800       8.2       102       154       100
VIS    2025250     91400   19.5600 -112.0000       7.8       104       154       100
VIS    2025250     91400   19.5400 -112.0300       7.7       106       148       100
VIS    2025250     91400   19.5600 -112.0700       6.4       109       152       100
VIS    2025250     91400   19.5600 -112.0800       6.5       109       152        99
VIS    2025250     91400   19.5500 -112.1300       5.9        95       153        92
VIS    2025250     91400   19.5200 -112.8100       7.3       128       141        94
VIS    2025250     91400   19.5300 -112.8700       9.0       133       139        99
VIS    2025250     91400   19.5100 -112.8900       9.1       145       138       100
VIS    2025250     91400   19.5100 -113.0500       7.6       151       128        96
VIS    2025250     91400   19.4800 -114.2900       6.3       278       113        91
VIS    2025250     91400   19.4900 -114.2900       6.3       277       113        92
VIS    2025250     91400   19.4900 -114.3300       6.4       269       115        96
VIS    2025250     91400   19.4800 -114.3800       7.2       264       122        90
VIS    2025250     91400   19.4600 -114.6400       4.5       261       137        94
VIS    2025250     91400   19.4600 -114.6700       4.5       263       138        91
VIS    2025250     91400   19.4700 -114.7300       7.4       272       146        99
VIS    2025250     91400   19.4500 -114.8600       4.2       241       159        91
VIS    2025250     91400   19.4600 -114.8600       4.1       237       159        96
VIS    2025250     91400   19.4400 -115.4300      11.0       149       183       100
VIS    2025250     91400   19.4400 -115.4300      10.9       150       184       100
VIS    2025250     91400   19.4400 -115.5100      13.0       154       183        99
VIS    2025250     91400   19.4300 -115.5200      12.7       155       183       100
VIS    2025250     91400   19.4300 -115.7500       7.0       171       169        98
VIS    2025250     91400   19.4200 -115.8200       6.1       177       164       100
VIS    2025250     91400   19.4200 -115.8500       5.8       178       159       100
VIS    2025250     91400   19.4200 -115.8500       5.7       176       157       100
VIS    2025250     91400   19.4200 -115.9400       5.3       172       147        99
VIS    2025250     91400   19.4200 -115.9800       4.4       170       148        99
VIS    2025250     91400   19.4300 -116.0000       5.1       163       148        95
VIS    2025250     91400   19.4200 -116.0300       5.3       159       152        97
VIS    2025250     91400   19.4400 -116.0700       5.1       162       156        93
VIS    2025250     91400   19.4200 -116.1500       7.5       184       152        97
VIS    2025250     91400   19.4300 -116.1800       6.4       175       149        99
VIS    2025250     91400   19.4300 -116.2000       5.9       174       147       100
VIS    2025250     91400   19.4300 -116.2300       6.0       169       142       100
VIS    2025250     91400   19.4100 -116.2600       6.4       166       141       100
VIS    2025250     91400   19.4100 -116.2900       6.4       167       141        99
VIS    2025250     91400   19.4100 -116.3200       5.3       180       141       100
VIS    2025250     91400   19.4300 -116.3400       4.7       190       139        99
VIS    2025250     91400   19.4200 -116.3600       4.0       186       142        98
VIS    2025250     91400   19.3900 -117.2200       5.4       156       172        95
VIS    2025250     91400   19.4000 -117.2600       6.1       148       178        99
VIS    2025250     91400   19.4000 -117.2800       5.9       148       179        98
VIS    2025250     91400   19.3800 -117.8300       6.0        53       167        99
VIS    2025250     91400   19.3800 -117.8600       6.1        57       166        96
VIS    2025250     91400   19.3800 -117.8900       5.1        48       162       100
VIS    2025250     91400   19.3700 -117.9100       5.5        51       162        97
VIS    2025250     91400   19.3700 -117.9300       5.0        60       158        99
VIS    2025250     91400   19.3800 -117.9700       5.7        52       153        99
VIS    2025250     91400   19.3900 -117.9800       5.7        49       152       100
VIS    2025250     91400   19.3700 -118.0300       5.1        42       155        99
VIS    2025250     91400   19.3700 -118.0500       5.1        39       155        99
VIS    2025250     91400   19.3700 -118.0900       6.4        46       158        94
VIS    2025250     91400   19.3800 -118.1200       5.9        48       164        98
VIS    2025250     91400   19.3800 -118.1300       5.6        51       166        99
VIS    2025250     91400   19.3600 -118.1800       6.2        68       169        98
VIS    2025250     91400   19.3700 -118.2200       5.6        61       170        98
VIS    2025250     91400   19.3600 -118.7200      10.3        32       170        95
VIS    2025250     91400   19.3600 -118.7700      10.1        26       167        91
VIS    2025250     91400   19.3600 -118.8500       6.5        61       150        96
VIS    2025250     91400   19.3600 -118.8700       7.5        56       150        92
VIS    2025250     91400   19.3500 -118.8800       8.5        53       148        90
VIS    2025250     91400   19.3600 -118.9200       9.0        37       144        97
VIS    2025250     91400   19.3600 -118.9600       9.2        27       141        99
VIS    2025250     91400   19.3400 -118.9800       9.3        24       142        98
VIS    2025250     91400   19.6300 -108.6600       9.2        63       172       100
VIS    2025250     91400   19.6300 -108.6800       8.9        66       172       100
VIS    2025250     91400   19.6200 -108.8000       8.1        93       154        95
VIS    2025250     91400   19.6200 -108.8000       7.9        94       154        97
VIS    2025250     91400   19.6400 -108.8400       5.9       100       159        98
VIS    2025250     91400   19.6400 -108.8900       6.2       107       161        97
VIS    2025250     91400   19.6300 -108.9000       7.3       106       162        96
VIS    2025250     91400   19.6200 -108.9800       4.8        56       175        93
VIS    2025250     91400   19.6400 -108.9900       5.3        46       177        97
VIS    2025250     91400   19.6000 -109.9600      11.1        31       729        99
VIS    2025250     91400   19.6000 -110.0100      10.8        27       731        94
VIS    2025250     91400   19.6000 -110.0200      10.6        26       730        91
VIS    2025250     91400   19.5800 -110.3600      12.6       351       829        94
VIS    2025250     91400   19.5800 -110.3900      12.4       350       812        96
VIS    2025250     91400   19.5800 -110.4000      12.4       350       812        96
VIS    2025250     91400   19.5500 -111.4800       6.7        34       160       100
VIS    2025250     91400   19.5300 -111.6300      10.1       110       147       100
VIS    2025250     91400   19.5400 -111.6400       9.7       107       147        99
VIS    2025250     91400   19.5400 -111.6700       9.3       105       152        98
VIS    2025250     91400   19.5200 -111.8700       8.5       103       149        99
VIS    2025250     91400   19.5400 -111.8700       8.1       101       149        94
VIS    2025250     91400   19.5200 -111.9100       7.9       103       149        97
VIS    2025250     91400   19.5400 -111.9400       8.3       104       148       100
VIS    2025250     91400   19.5200 -111.9800       7.6        96       147       100
VIS    2025250     91400   19.5300 -112.0100       7.7       102       147       100
VIS    2025250     91400   19.5300 -112.0300       7.9       106       148       100
VIS    2025250     91400   19.5200 -112.0600       7.7       105       147       100
VIS    2025250     91400   19.5200 -112.0800       7.2       105       147       100
VIS    2025250     91400   19.5000 -112.8400       7.1       134       140       100
VIS    2025250     91400   19.4900 -112.8500       7.4       135       140       100
VIS    2025250     91400   19.4900 -112.8800       8.5       139       138       100
VIS    2025250     91400   19.5100 -112.9000       9.2       141       136        93
VIS    2025250     91400   19.4900 -112.9600       8.9       146       131        94
VIS    2025250     91400   19.4500 -114.6700       4.6       266       138        92
VIS    2025250     91400   19.4300 -114.8000       6.4       274       158        93
VIS    2025250     91400   19.4300 -115.4200      11.7       150       184       100
VIS    2025250     91400   19.4100 -115.4400       9.9       145       182        90
VIS    2025250     91400   19.4300 -115.4600      10.6       150       183        92
VIS    2025250     91400   19.4200 -115.5000      11.5       153       184        95
VIS    2025250     91400   19.4200 -115.5400      12.1       157       183       100
VIS    2025250     91400   19.4200 -115.5400      11.9       157       183       100
VIS    2025250     91400   19.4000 -115.7400       9.0       172       174       100
VIS    2025250     91400   19.4200 -115.7500       7.2       171       169        99
VIS    2025250     91400   19.4000 -115.7700       7.5       170       169        99
VIS    2025250     91400   19.4100 -115.8100       5.7       174       164        99
VIS    2025250     91400   19.4100 -115.8200       5.8       180       161        99
VIS    2025250     91400   19.4100 -115.8600       5.6       169       151        97
VIS    2025250     91400   19.4100 -115.9400       5.3       167       148        95
VIS    2025250     91400   19.4100 -115.9900       4.1       169       151        98
VIS    2025250     91400   19.4100 -116.0100       4.6       163       152        97
VIS    2025250     91400   19.4100 -116.0200       4.7       163       152        99
VIS    2025250     91400   19.3900 -116.1300      13.1       187       155       100
VIS    2025250     91400   19.3900 -116.2100       6.0       170       147        96
VIS    2025250     91400   19.4000 -116.2200       6.2       170       145       100
VIS    2025250     91400   19.4100 -116.2600       6.4       166       141       100
VIS    2025250     91400   19.3900 -116.2700       5.9       166       143       100
VIS    2025250     91400   19.4000 -116.3200       5.1       180       141       100
VIS    2025250     91400   19.3800 -117.2100       5.3       157       172        99
VIS    2025250     91400   19.3800 -117.2200       6.4       151       172        96
VIS    2025250     91400   19.3600 -117.2600       5.2       133       175        90
VIS    2025250     91400   19.3500 -117.7200      10.2       149       187        95
VIS    2025250     91400   19.3600 -117.7400      11.1       150       185       100
VIS    2025250     91400   19.3600 -117.9300       5.0        63       158        95
VIS    2025250     91400   19.3600 -117.9800       5.6        61       154        90
VIS    2025250     91400   19.3500 -118.0100       5.4        46       157        99
VIS    2025250     91400   19.3400 -118.0400       4.8        39       156       100
VIS    2025250     91400   19.3600 -118.0500       4.9        38       155       100
VIS    2025250     91400   19.3600 -118.0900       6.0        43       158        97
VIS    2025250     91400   19.3600 -118.1000       6.5        45       159        96
VIS    2025250     91400   19.3400 -118.1400       6.7        43       166       100
VIS    2025250     91400   19.3400 -118.1600       6.8        46       168        99
VIS    2025250     91400   19.3500 -118.2000       5.9        63       170        95
VIS    2025250     91400   19.3400 -118.2200       5.3        56       176        91
VIS    2025250     91400   19.3500 -118.2300       5.8        56       172        95
VIS    2025250     91400   19.3400 -118.2800       7.6        59       172        97
VIS    2025250     91400   19.3500 -118.5000       4.8        30       185        95
VIS    2025250     91400   19.3300 -118.6300      11.2         6       167        91
VIS    2025250     91400   19.3200 -118.7900      11.7        55       162        90
VIS    2025250     91400   19.3200 -118.8700       9.5        41       150        90
VIS    2025250     91400   19.3200 -118.9100       9.6        39       149        95
VIS    2025250     91400   19.3200 -118.9500       8.6        28       143       100
VIS    2025250     91400   19.3300 -118.9700       8.6        25       142        99
VIS    2025250     91400   19.3200 -118.9900       8.2        22       143       100
VIS    2025250     91400   19.6100 -108.6700       8.6        78       172        93
VIS    2025250     91400   19.6000 -108.8700       6.2       119       158        95
VIS    2025250     91400   19.6000 -108.8900       5.9       113       159       100
VIS    2025250     91400   19.6000 -108.9300       7.2       105       166        99
VIS    2025250     91400   19.6100 -108.9700       4.6        74       175        93
VIS    2025250     91400   19.5900 -109.0100       4.3        50       180        95
VIS    2025250     91400   19.5700 -110.0000      10.9        30       790       100
VIS    2025250     91400   19.5700 -110.0100      11.1        30       790       100
VIS    2025250     91400   19.5400 -111.1800       5.4        32       174        90
VIS    2025250     91400   19.5200 -111.4800       6.5        35       160        92
VIS    2025250     91400   19.5300 -111.4800       6.6        33       158       100
VIS    2025250     91400   19.5200 -111.6400      10.1       109       150       100
VIS    2025250     91400   19.5000 -111.6600       9.8       106       152        98
VIS    2025250     91400   19.5000 -111.8600       8.3       101       151        99
VIS    2025250     91400   19.5100 -111.8900       8.1       101       150       100
VIS    2025250     91400   19.5100 -111.9000       8.0       101       150        99
VIS    2025250     91400   19.4900 -111.9400       7.3        99       151        98
VIS    2025250     91400   19.5100 -111.9800       7.2        95       147       100
VIS    2025250     91400   19.5100 -111.9900       7.2        95       147       100
VIS    2025250     91400   19.5100 -112.0200       7.4       100       147        99
VIS    2025250     91400   19.5000 -112.0600       7.5       103       145        97
VIS    2025250     91400   19.4700 -112.6700       7.1       116       148        90
VIS    2025250     91400   19.4800 -112.7200       7.9       124       146        94
VIS    2025250     91400   19.4700 -112.8200       5.4       145       143        90
VIS    2025250     91400   19.4800 -112.8600       7.2       136       140       100
VIS    2025250     91400   19.4800 -112.8900       8.5       141       138       100
VIS    2025250     91400   19.4700 -112.9000       8.0       142       138        97
VIS    2025250     91400   19.4600 -112.9400       6.5       154       137       100
VIS    2025250     91400   19.4200 -114.4200       6.7       316       125        99
VIS    2025250     91400   19.4100 -114.5800       4.0       275       133        95
VIS    2025250     91400   19.3800 -115.4400      10.0       136       176        94
VIS    2025250     91400   19.3900 -115.4900       9.8       139       179       100
VIS    2025250     91400   19.4000 -115.5300      12.1       159       183       100
VIS    2025250     91400   19.3900 -115.7300      10.4       170       176       100
VIS    2025250     91400   19.4000 -115.7600       8.8       171       171       100
VIS    2025250     91400   19.3800 -115.7800       7.9       171       169       100
VIS    2025250     91400   19.3800 -115.8100       5.9       174       166        99
VIS    2025250     91400   19.3900 -115.8200       5.6       178       161        98
VIS    2025250     91400   19.3900 -116.0000       4.4       164       157        95
VIS    2025250     91400   19.3800 -116.0400       4.3       164       156        99
VIS    2025250     91400   19.3800 -116.1500      13.1       187       156       100
VIS    2025250     91400   19.3600 -116.1800       5.4       155       155        99
VIS    2025250     91400   19.3600 -116.2100       5.6       156       152        98
VIS    2025250     91400   19.3800 -116.2400       6.0       166       145       100
VIS    2025250     91400   19.3800 -116.2600       5.8       165       144        99
VIS    2025250     91400   19.3600 -116.3000       4.8       168       148        98
VIS    2025250     91400   19.3800 -116.3000       5.3       169       147        98
VIS    2025250     91400   19.3600 -116.4900       4.0       229       184        93
VIS    2025250     91400   19.3500 -116.5100       4.2       232       184        93
VIS    2025250     91400   19.3500 -117.2100       5.6       157       173        97
VIS    2025250     91400   19.3600 -117.2100       5.9       154       173        98
VIS    2025250     91400   19.3300 -118.0900       5.1        39       171       100
VIS    2025250     91400   19.3200 -118.1000       5.2        38       171        98
VIS    2025250     91400   19.3100 -118.1400       5.8        39       172       100
VIS    2025250     91400   19.3300 -118.1600       6.8        43       170       100
VIS    2025250     91400   19.3100 -118.1900       6.2        43       179        91
VIS    2025250     91400   19.3200 -118.2200       6.0        47       177        92
VIS    2025250     91400   19.3100 -118.2400       6.6        49       177        98
VIS    2025250     91400   19.3200 -118.2600       7.2        47       176       100
VIS    2025250     91400   19.3200 -118.6800       9.5        17       171        98
VIS    2025250     91400   19.3100 -118.6900       9.4        18       171        97
VIS    2025250     91400   19.2900 -118.8300      10.4        38       157       100
VIS    2025250     91400   19.2900 -118.8700      10.2        37       152       100
VIS    2025250     91400   19.2900 -118.8900      10.0        37       146       100
VIS    2025250     91400   19.3100 -118.9200       9.3        35       147        96
VIS    2025250     91400   19.3100 -118.9500       8.8        30       147       100
VIS    2025250     91400   19.2900 -118.9800       8.1        21       143        97
VIS    2025250     91400   19.2900 -119.0000       8.2        19       143        98
VIS    2025250     91400   19.6000 -108.6700       8.4        81       172        96
VIS    2025250     91400   19.5800 -108.8500       8.1        92       156        90
VIS    2025250     91400   19.5900 -108.9000       6.3       112       160        99
VIS    2025250     91400   19.5800 -108.9100       6.8       112       160       100
VIS    2025250     91400   19.5900 -108.9600       6.5        95       172        99
VIS    2025250     91400   19.5700 -108.9800       5.8        78       178        91
VIS    2025250     91400   19.5700 -109.0300       5.4        33       185        98
VIS    2025250     91400   19.4800 -111.6400      10.2       101       151        99
VIS    2025250     91400   19.4800 -111.6700       9.4       100       152        98
VIS    2025250     91400   19.4900 -111.6800       9.2       105       154        93
VIS    2025250     91400   19.4700 -111.8400       8.4        99       156        99
VIS    2025250     91400   19.4700 -111.8800       7.7        98       153       100
VIS    2025250     91400   19.4700 -111.9100       8.0        98       151        99
VIS    2025250     91400   19.4800 -111.9400       7.5        98       152        98
VIS    2025250     91400   19.4800 -111.9500       7.4        98       152        98
VIS    2025250     91400   19.4700 -111.9900       7.7        99       150       100
VIS    2025250     91400   19.4700 -112.0300       7.0        97       150        97
VIS    2025250     91400   19.4700 -112.0700       5.5        89       151       100
VIS    2025250     91400   19.4400 -112.6200       6.2       117       155        98
VIS    2025250     91400   19.4500 -112.6300       6.3       122       155        96
VIS    2025250     91400   19.4400 -112.6600       6.6       122       152        99
VIS    2025250     91400   19.4400 -112.6900       7.5       120       151       100
VIS    2025250     91400   19.4600 -112.7200       7.6       129       147        98
VIS    2025250     91400   19.4500 -112.7400       6.9       130       146        99
VIS    2025250     91400   19.4600 -112.7800       4.9       136       146        92
VIS    2025250     91400   19.4500 -112.8100       5.2       144       145        97
VIS    2025250     91400   19.4400 -112.8400       5.3       156       144        99
VIS    2025250     91400   19.4500 -112.8700       6.2       142       142        97
VIS    2025250     91400   19.4500 -112.9000       7.1       141       140        97
VIS    2025250     91400   19.4400 -112.9500       6.7       155       137        98
VIS    2025250     91400   19.3900 -114.2800       4.8       346       119        90
VIS    2025250     91400   19.4000 -114.5700       4.4       276       133        97
VIS    2025250     91400   19.3900 -114.7500       4.3       249       161        99
VIS    2025250     91400   19.3800 -115.4400       9.8       136       176        92
VIS    2025250     91400   19.3600 -115.4700       9.3       135       175       100
VIS    2025250     91400   19.3600 -115.5100       8.3       148       176        95
VIS    2025250     91400   19.3600 -115.5500       9.8       168       184        96
VIS    2025250     91400   19.3600 -115.7400      13.8       165       178       100
VIS    2025250     91400   19.3600 -115.7800      11.0       170       174       100
VIS    2025250     91400   19.3600 -115.7800      10.8       171       172       100
VIS    2025250     91400   19.3500 -115.8300       6.5       185       160        99
VIS    2025250     91400   19.3600 -115.8500       6.4       186       158        93
VIS    2025250     91400   19.3400 -116.0200       5.0       159       156        96
VIS    2025250     91400   19.3600 -116.0300       4.5       162       155        90
VIS    2025250     91400   19.3400 -116.0900       4.0       148       161        90
VIS    2025250     91400   19.3600 -116.1400      12.9       187       156       100
VIS    2025250     91400   19.3400 -116.2000       5.3       146       151        99
VIS    2025250     91400   19.3400 -116.2100       5.6       145       146       100
VIS    2025250     91400   19.3400 -116.2400       5.6       145       152       100
VIS    2025250     91400   19.3400 -116.2600       5.0       154       153       100
VIS    2025250     91400   19.3400 -116.3000       4.3       167       157       100
VIS    2025250     91400   19.3500 -116.5100       4.1       230       183        90
VIS    2025250     91400   19.3000 -117.7400       5.6       175       184        94
VIS    2025250     91400   19.2900 -118.1200       5.0        38       171        98
VIS    2025250     91400   19.2900 -118.1600       4.9        37       172        99
VIS    2025250     91400   19.3000 -118.1600       5.6        39       172       100
VIS    2025250     91400   19.2900 -118.2100       5.9        50       183        96
VIS    2025250     91400   19.2800 -118.2400       6.7        46       183       100
VIS    2025250     91400   19.2900 -118.2500       6.9        46       180       100
VIS    2025250     91400   19.2800 -118.2800       6.6        35       182        98
VIS    2025250     91400   19.3000 -118.3000       4.7        24       185        98
VIS    2025250     91400   19.2800 -118.3300       4.3        33       185        99
VIS    2025250     91400   19.2900 -118.8300      10.5        37       157       100
VIS    2025250     91400   19.2700 -118.8600      10.7        36       156       100
VIS    2025250     91400   19.2700 -118.8900      10.3        37       154       100
VIS    2025250     91400   19.2900 -118.8900      10.0        37       149       100
VIS    2025250     91400   19.2800 -118.9400       8.9        32       148        98
VIS    2025250     91400   19.2800 -118.9600       8.4        26       145        96
VIS    2025250     91400   19.2800 -118.9900       8.4        17       143        99
VIS    2025250     91400   19.2800 -119.0000       8.4        21       143        97
VIS    2025250     91400   19.5400 -108.8800       6.4       130       155        96
VIS    2025250     91400   19.5600 -108.8800       5.9       126       158       100
VIS    2025250     91400   19.5600 -108.9100       6.5       116       161       100
VIS    2025250     91400   19.5400 -108.9700       8.9        97       176        97
VIS    2025250     91400   19.5500 -109.0000       8.5        76       181        93
VIS    2025250     91400   19.4700 -111.6400      10.1        97       150        98
VIS    2025250     91400   19.4600 -111.6700       9.6        97       150        98
VIS    2025250     91400   19.4500 -111.7100       7.4        96       153        96
VIS    2025250     91400   19.4500 -111.7700       7.6        97       157        92
VIS    2025250     91400   19.4500 -111.8200       9.3        97       159       100
VIS    2025250     91400   19.4500 -111.8400       9.0        98       159       100
VIS    2025250     91400   19.4500 -111.8600       7.9       100       155        99
VIS    2025250     91400   19.4500 -111.9000       8.0       104       153       100
VIS    2025250     91400   19.4500 -111.9500       7.7       102       153        98
VIS    2025250     91400   19.4500 -111.9600       7.5       100       153        96
VIS    2025250     91400   19.4400 -111.9800       8.2        98       153       100
VIS    2025250     91400   19.4600 -112.0300       7.2        96       150        98
VIS    2025250     91400   19.4400 -112.0600       6.5        93       151        99
VIS    2025250     91400   19.4300 -112.6300       6.3       114       155        99
VIS    2025250     91400   19.4200 -112.6700       6.4       110       153       100
VIS    2025250     91400   19.4200 -112.7100       6.8       120       149       100
VIS    2025250     91400   19.4200 -112.7300       6.8       124       147        99
VIS    2025250     91400   19.4300 -112.7600       6.0       133       146        97
VIS    2025250     91400   19.4200 -112.8000       5.1       147       147       100
VIS    2025250     91400   19.4200 -112.8300       5.4       157       144        99
VIS    2025250     91400   19.4300 -112.8300       5.4       156       144       100
VIS    2025250     91400   19.4100 -112.8900       6.0       167       144        96
VIS    2025250     91400   19.4300 -112.9600       6.6       151       137        96
VIS    2025250     91400   19.3800 -114.5400       4.0       271       136        98
VIS    2025250     91400   19.3700 -114.5700       5.0       278       135       100
VIS    2025250     91400   19.3300 -115.4500       9.4       145       179        92
VIS    2025250     91400   19.3500 -115.4800       9.1       138       175        99
VIS    2025250     91400   19.3400 -115.5100       8.1       144       175        95
VIS    2025250     91400   19.3300 -115.5400       7.7       157       178        94
VIS    2025250     91400   19.3400 -115.7400      17.3       161       178       100
VIS    2025250     91400   19.3300 -115.7800       8.5       172       173        99
VIS    2025250     91400   19.3300 -115.7900       8.8       173       172        99
VIS    2025250     91400   19.3300 -115.8200       8.6       173       168        98
VIS    2025250     91400   19.3400 -115.8800       5.2       182       153        98
VIS    2025250     91400   19.3200 -115.9200       5.1       173       152        98
VIS    2025250     91400   19.3300 -115.9300       5.1       172       152        92
VIS    2025250     91400   19.3300 -116.0100       5.3       164       162        96
VIS    2025250     91400   19.3400 -116.0200       4.9       159       159        96
VIS    2025250     91400   19.3100 -116.1400       4.6       160       155        99
VIS    2025250     91400   19.3100 -116.1800       5.6       153       148        99
VIS    2025250     91400   19.3300 -116.2000       5.7       146       146       100
VIS    2025250     91400   19.3300 -116.2100       5.6       146       146       100
VIS    2025250     91400   19.3300 -116.2400       5.5       144       153       100
VIS    2025250     91400   19.3300 -116.2700       4.8       156       154       100
VIS    2025250     91400   19.3100 -116.3200       4.3       169       163       100
VIS    2025250     91400   19.3100 -116.3400       4.2       178       169       100
VIS    2025250     91400   19.3100 -116.3900       4.3       192       178       100
VIS    2025250     91400   19.3100 -117.0100       5.6       143       176       100
VIS    2025250     91400   19.3100 -117.0100       5.4       137       175        96
VIS    2025250     91400   19.2700 -117.7500       5.7       182       182       100
VIS    2025250     91400   19.2700 -118.1000       4.8        39       168       100
VIS    2025250     91400   19.2600 -118.1200       4.6        35       169       100
VIS    2025250     91400   19.2700 -118.1500       4.7        30       171        97
VIS    2025250     91400   19.2600 -118.1700       4.9        28       174        95
VIS    2025250     91400   19.2600 -118.2100       6.1        35       175       100
VIS    2025250     91400   19.2600 -118.2400       6.4        38       177       100
VIS    2025250     91400   19.2600 -118.2500       6.6        41       179       100
VIS    2025250     91400   19.2700 -118.2800       7.2        40       183        97
VIS    2025250     91400   19.2700 -118.3300       4.6        37       185       100
VIS    2025250     91400   19.2600 -118.8700      10.8        36       156       100
VIS    2025250     91400   19.2600 -118.8800      10.9        35       156       100
VIS    2025250     91400   19.2400 -118.9100      10.0        32       160       100
VIS    2025250     91400   19.2600 -118.9300       9.6        34       154        99
VIS    2025250     91400   19.2600 -118.9500       8.9        28       145        97
VIS    2025250     91400   19.2500 -118.9900       9.7        18       149        93
VIS    2025250     91400   19.2500 -119.0200       8.5        25       153        92
VIS    2025250     91400   19.5400 -108.6800      10.8       119       170        99
VIS    2025250     91400   19.5400 -108.7300       7.2       122       165        93
VIS    2025250     91400   19.5400 -108.7300       7.2       124       165        93
VIS    2025250     91400   19.5300 -108.8200       7.6       127       158        96
VIS    2025250     91400   19.5200 -108.8500       7.1       126       155        96
VIS    2025250     91400   19.5200 -108.8800       6.4       127       155        93
VIS    2025250     91400   19.5400 -108.9000       5.6       130       157        99
VIS    2025250     91400   19.5100 -109.0100      10.3        90       181        94
VIS    2025250     91400   19.5200 -109.0300       9.8        89       181        96
VIS    2025250     91400   19.4400 -111.6400       9.3        96       149       100
VIS    2025250     91400   19.4400 -111.6500       9.5        96       149        99
VIS    2025250     91400   19.4200 -111.7000       8.0        97       153        99
VIS    2025250     91400   19.4300 -111.7300       6.8        98       154        95
VIS    2025250     91400   19.4200 -111.7500       7.0        96       154        93
VIS    2025250     91400   19.4200 -111.7800       8.2        95       156        98
VIS    2025250     91400   19.4300 -111.8100       9.4        96       159        99
VIS    2025250     91400   19.4200 -111.8400       9.1        96       159       100
VIS    2025250     91400   19.4300 -111.8700       7.9       102       155       100
VIS    2025250     91400   19.4200 -111.8900       8.1       106       155       100
VIS    2025250     91400   19.4200 -111.9400       8.0       104       155        99
VIS    2025250     91400   19.4300 -111.9600       7.7       100       155        98
VIS    2025250     91400   19.4100 -112.0000       8.6       100       155       100
VIS    2025250     91400   19.4200 -112.0200       8.1        99       152       100
VIS    2025250     91400   19.4200 -112.0600       6.3        95       153        99
VIS    2025250     91400   19.4100 -112.0800       5.1        96       156        99
VIS    2025250     91400   19.4100 -112.6600       6.4       118       153        92
VIS    2025250     91400   19.4100 -112.6800       6.4       110       153        99
VIS    2025250     91400   19.4100 -112.7200       6.8       123       149       100
VIS    2025250     91400   19.4000 -112.7600       6.1       130       147        92
VIS    2025250     91400   19.4100 -112.7700       5.8       133       147        97
VIS    2025250     91400   19.4000 -112.8100       5.4       151       147       100
VIS    2025250     91400   19.3900 -112.8600       7.4       161       144        95
VIS    2025250     91400   19.3900 -112.8600       7.5       161       144        96
VIS    2025250     91400   19.4000 -112.8900       7.6       170       144        94
VIS    2025250     91400   19.3800 -112.9400       7.9       166       136        96
VIS    2025250     91400   19.3900 -113.1400       7.0       123       119        92
VIS    2025250     91400   19.3700 -113.9900       4.5       238       112        93
VIS    2025250     91400   19.3400 -114.4900       4.3       270       136        91
VIS    2025250     91400   19.3400 -114.7600       4.7       272       165        98
VIS    2025250     91400   19.3300 -115.4500       9.7       146       182        96
VIS    2025250     91400   19.3100 -115.5000       8.4       143       180        96
VIS    2025250     91400   19.3100 -115.5000       8.3       143       179        96
VIS    2025250     91400   19.3200 -115.5500       7.6       161       179        95
VIS    2025250     91400   19.3100 -115.5600       7.7       164       182        99
VIS    2025250     91400   19.3200 -115.7700       6.9       174       174        97
VIS    2025250     91400   19.3200 -115.8000       7.4       174       172        97
VIS    2025250     91400   19.3000 -115.8200       7.9       170       170        92
VIS    2025250     91400   19.3000 -115.8500       9.0       170       168        91
VIS    2025250     91400   19.3000 -115.8800       4.2       175       154        99
VIS    2025250     91400   19.3000 -115.9200       4.2       174       155        97
VIS    2025250     91400   19.3100 -116.0000       4.9       172       164        94
VIS    2025250     91400   19.2900 -116.0200       4.3       169       161        94
VIS    2025250     91400   19.2900 -116.0400       4.2       161       160        96
VIS    2025250     91400   19.2900 -116.1100       4.1       160       143       100
VIS    2025250     91400   19.3100 -116.1300       4.6       161       143        99
VIS    2025250     91400   19.3100 -116.1400       4.8       159       148        99
VIS    2025250     91400   19.2900 -116.1900       5.8       158       142       100
VIS    2025250     91400   19.2900 -116.2200       5.1       148       146       100
VIS    2025250     91400   19.3100 -116.2300       5.4       143       148       100
VIS    2025250     91400   19.2900 -116.2700       4.5       160       154       100
VIS    2025250     91400   19.2900 -116.2900       4.6       167       157       100
VIS    2025250     91400   19.2900 -116.3100       4.3       171       160       100
VIS    2025250     91400   19.3000 -116.3700       4.3       191       172       100
VIS    2025250     91400   19.3000 -116.4100       4.4       193       179        98
VIS    2025250     91400   19.3000 -116.4300       4.2       195       180        95
VIS    2025250     91400   19.2900 -116.9900       5.2       158       179        94
VIS    2025250     91400   19.2400 -117.7800       6.7       184       181        94
VIS    2025250     91400   19.2400 -117.8200       4.2       154       182       100
VIS    2025250     91400   19.2400 -118.1000       5.2        30       169        97
VIS    2025250     91400   19.2600 -118.1200       4.7        34       169       100
VIS    2025250     91400   19.2400 -118.1600       5.4        22       173        99
VIS    2025250     91400   19.2400 -118.1600       5.4        22       173        99
VIS    2025250     91400   19.2500 -118.1900       5.8        24       177        90
VIS    2025250     91400   19.2500 -118.2400       6.2        30       176        97
VIS    2025250     91400   19.2500 -118.2400       6.3        32       176        98
VIS    2025250     91400   19.2500 -118.2700       6.8        33       178        96
VIS    2025250     91400   19.2400 -118.3000       7.4        33       177       100
VIS    2025250     91400   19.2300 -118.9100      10.3        35       160        95
VIS    2025250     91400   19.2200 -118.9400      10.9        12       157       100
VIS    2025250     91400   19.2100 -118.9700      11.4        13       151        97
VIS    2025250     91400   19.2200 -118.9900      10.5        20       151        97
VIS    2025250     91400   19.5200 -108.7300       8.1       123       165        90
VIS    2025250     91400   19.5100 -108.7400       7.9       124       165        93
VIS    2025250     91400   19.5100 -108.8100       7.7       125       159        90
VIS    2025250     91400   19.5100 -108.8500       6.8       123       157        99
VIS    2025250     91400   19.4900 -108.8900       5.7       123       158        98
VIS    2025250     91400   19.5000 -108.9000       5.6       123       157        99
VIS    2025250     91400   19.5000 -108.9700       7.2       119       164        99
VIS    2025250     91400   19.4400 -111.0100       5.2       111       160        99
VIS    2025250     91400   19.4400 -111.0100       4.9       109       160       100
VIS    2025250     91400   19.4200 -111.0500       4.6       107       158        99
VIS    2025250     91400   19.4000 -111.6500       8.3        93       147       100
VIS    2025250     91400   19.4000 -111.7000       8.1        91       151       100
VIS    2025250     91400   19.4000 -111.7100       8.1        91       153        99
VIS    2025250     91400   19.4000 -111.7500       6.4       100       154       100
VIS    2025250     91400   19.4100 -111.7800       8.1        95       156        99
VIS    2025250     91400   19.3900 -111.8000       7.9        94       156       100
VIS    2025250     91400   19.4100 -111.8300       9.0        96       159       100
VIS    2025250     91400   19.4000 -111.8700       7.9        98       157        97
VIS    2025250     91400   19.4000 -111.8900       7.9       103       155       100
VIS    2025250     91400   19.3900 -111.9300       7.8        99       155        98
VIS    2025250     91400   19.4000 -111.9600       7.9        97       155        99
VIS    2025250     91400   19.4000 -111.9800       8.0        97       155       100
VIS    2025250     91400   19.4000 -112.0100       8.6       101       155       100
VIS    2025250     91400   19.3900 -112.0400       8.1        98       156       100
VIS    2025250     91400   19.4100 -112.0800       5.4        96       156       100
VIS    2025250     91400   19.3600 -112.9000       8.3       149       139        92
VIS    2025250     91400   19.3600 -112.9200       8.4       155       136        97
VIS    2025250     91400   19.3500 -113.0900       4.7       158       120        91
VIS    2025250     91400   19.3400 -114.1500       5.8        29       115        99
VIS    2025250     91400   19.3200 -114.7000       6.7       159       152        92
VIS    2025250     91400   19.3000 -115.4500      10.0       152       183       100
VIS    2025250     91400   19.3000 -115.4900       9.6       145       180        95
VIS    2025250     91400   19.3000 -115.4900       9.2       145       180        96
VIS    2025250     91400   19.2900 -115.5300       8.9       151       181        97
VIS    2025250     91400   19.3000 -115.5600       7.8       164       183        99
VIS    2025250     91400   19.2700 -115.8000       6.3       169       174        97
VIS    2025250     91400   19.2700 -115.8300       7.2       166       170        99
VIS    2025250     91400   19.2700 -115.8300       7.3       166       170        99
VIS    2025250     91400   19.2700 -115.8800       5.9       165       154        93
VIS    2025250     91400   19.2800 -115.9100       4.2       171       155        98
VIS    2025250     91400   19.2900 -115.9900       4.2       179       164        92
VIS    2025250     91400   19.2700 -116.0600       4.6       147       147        98
VIS    2025250     91400   19.2800 -116.0900       4.1       150       140        99
VIS    2025250     91400   19.2600 -116.1400       5.4       140       138        95
VIS    2025250     91400   19.2600 -116.1500       6.0       143       136        95
VIS    2025250     91400   19.2700 -116.1800       5.5       152       138        98
VIS    2025250     91400   19.2800 -116.2100       5.1       150       141       100
VIS    2025250     91400   19.2700 -116.2200       4.4       150       141        97
VIS    2025250     91400   19.2800 -116.2700       4.5       162       154       100
VIS    2025250     91400   19.2700 -116.2900       4.4       169       154        97
VIS    2025250     91400   19.2600 -116.3300       4.1       170       159        99
VIS    2025250     91400   19.2600 -116.4400       4.5       203       179        91
VIS    2025250     91400   19.2400 -117.7900       6.4       182       181        99
VIS    2025250     91400   19.2300 -118.1000       5.2        29       170        96
VIS    2025250     91400   19.2300 -118.1300       5.1        24       172       100
VIS    2025250     91400   19.2300 -118.1600       5.5        21       173       100
VIS    2025250     91400   19.2100 -118.2100       5.9        20       177        92
VIS    2025250     91400   19.2300 -118.2500       6.1        25       175        97
VIS    2025250     91400   19.2100 -118.2700       6.6        19       178       100
VIS    2025250     91400   19.2200 -118.3000       7.8        25       177        99
VIS    2025250     91400   19.2200 -118.3300       7.9        38       182       100
VIS    2025250     91400   19.2100 -118.3500       8.0        53       184       100
VIS    2025250     91400   19.2000 -118.9400      11.2        11       158       100
VIS    2025250     91400   19.2000 -118.9600      11.2        11       155       100
VIS    2025250     91400   19.2100 -118.9700      11.3        13       151        97
VIS    2025250     91400   19.4800 -108.6900       9.2       121       161        90
VIS    2025250     91400   19.4900 -108.7200       8.6       122       159        94
VIS    2025250     91400   19.4700 -108.7800       8.4       120       158        91
VIS    2025250     91400   19.4800 -108.9000       5.5       125       160        95
VIS    2025250     91400   19.4900 -108.9000       5.6       123       160        98
VIS    2025250     91400   19.4800 -108.9500       6.5       122       162       100
VIS    2025250     91400   19.4600 -108.9800       6.2       118       163        98
VIS    2025250     91400   19.4700 -109.0200       6.5       116       177        94
VIS    2025250     91400   19.4700 -109.0300       6.5       116       179        95
VIS    2025250     91400   19.4800 -109.0600       5.8       102       183        96
VIS    2025250     91400   19.4200 -110.9700       6.6       112       153        99
VIS    2025250     91400   19.4000 -111.0000       6.3       115       146        96
VIS    2025250     91400   19.3900 -111.0100       6.4       117       146        95
VIS    2025250     91400   19.4100 -111.0600       4.6       109       157       100
VIS    2025250     91400   19.4100 -111.0700       4.8       111       157       100
VIS    2025250     91400   19.3900 -111.6600       8.3        92       147       100
VIS    2025250     91400   19.3900 -111.6700       8.2        91       148       100
VIS    2025250     91400   19.3900 -111.7000       8.1        90       148       100
VIS    2025250     91400   19.3900 -111.7500       6.2       102       154       100
VIS    2025250     91400   19.3900 -111.7800       7.2        96       155       100
VIS    2025250     91400   19.3800 -111.8000       8.0        95       157       100
VIS    2025250     91400   19.3800 -111.8200       8.1        94       157        99
VIS    2025250     91400   19.3800 -111.8600       8.4        94       157        99
VIS    2025250     91400   19.3700 -111.8800       8.5        94       156        99
VIS    2025250     91400   19.3600 -111.9200       8.0        99       153        95
VIS    2025250     91400   19.3600 -111.9600       7.9        98       153        97
VIS    2025250     91400   19.3700 -111.9800       8.2        99       155        99
VIS    2025250     91400   19.3700 -112.0100       8.7       102       154        99
VIS    2025250     91400   19.3800 -112.0300       8.3        99       155       100
VIS    2025250     91400   19.3800 -112.0800       6.2        99       157        99
VIS    2025250     91400   19.3800 -112.1000       5.5       106       157        99
VIS    2025250     91400   19.3600 -112.1300       6.6       111       156       100
VIS    2025250     91400   19.3600 -112.1900       6.6        97       153       100
VIS    2025250     91400   19.3700 -112.2200       7.4        98       151       100
VIS    2025250     91400   19.3500 -112.2400       7.2       100       150        99
VIS    2025250     91400   19.3500 -112.8300       7.2       174       147        95
VIS    2025250     91400   19.3300 -112.8700       7.9       152       140        94
VIS    2025250     91400   19.3500 -112.8900       8.3       148       139        94
VIS    2025250     91400   19.3300 -112.9300       8.7       148       136        96
VIS    2025250     91400   19.3400 -112.9400       8.5       152       136        97
VIS    2025250     91400   19.3400 -112.9600       8.4       162       135        97
VIS    2025250     91400   19.3500 -113.0800       4.5       157       122        94
VIS    2025250     91400   19.3200 -113.8600       4.8       271       111       100
VIS    2025250     91400   19.3000 -113.8800       4.4       271       112        91
VIS    2025250     91400   19.3100 -113.9000       4.6       270       113        94
VIS    2025250     91400   19.3100 -114.3600       9.0       249       132        91
VIS    2025250     91400   19.3100 -114.3900       9.1       250       132        94
VIS    2025250     91400   19.2600 -115.4500       8.7       144       177        91
VIS    2025250     91400   19.2700 -115.4600      10.0       147       177        97
VIS    2025250     91400   19.2700 -115.4900       9.2       133       176        97
VIS    2025250     91400   19.2800 -115.5200       8.9       139       181       100
VIS    2025250     91400   19.2800 -115.5400       8.7       151       183        98
VIS    2025250     91400   19.2500 -115.7800       6.6       169       185       100
VIS    2025250     91400   19.2700 -115.8100       7.2       166       173        98
VIS    2025250     91400   19.2500 -115.8300       7.4       167       172        92
VIS    2025250     91400   19.2500 -115.8500       6.8       164       168        97
VIS    2025250     91400   19.2700 -115.8800       6.2       164       154        93
VIS    2025250     91400   19.2400 -116.1000       5.0       131       139       100
VIS    2025250     91400   19.2600 -116.1300       5.0       138       138        97
VIS    2025250     91400   19.2500 -116.1400       5.5       133       136        92
VIS    2025250     91400   19.2600 -116.1600       6.0       142       136        92
VIS    2025250     91400   19.2500 -116.3000       4.2       170       156        96
VIS    2025250     91400   19.2500 -116.3300       4.1       170       159        99
VIS    2025250     91400   19.2000 -118.0800       5.4        37       164       100
VIS    2025250     91400   19.1900 -118.0900       5.6        40       161       100
VIS    2025250     91400   19.2000 -118.1400       5.6        27       169        99
VIS    2025250     91400   19.1900 -118.1500       5.5        29       168       100
VIS    2025250     91400   19.2000 -118.1700       5.7        23       171        98
VIS    2025250     91400   19.2000 -118.2100       5.2        22       176        98
VIS    2025250     91400   19.2000 -118.2400       5.5        21       177        98
VIS    2025250     91400   19.1900 -118.2700       6.4        22       175        91
VIS    2025250     91400   19.1800 -118.3200       6.7        29       178        99
VIS    2025250     91400   19.1800 -118.3500       8.1        20       182        99
VIS    2025250     91400   19.1800 -118.6000       5.4        65       176        99
VIS    2025250     91400   19.1800 -118.6300       4.6        66       180        93
VIS    2025250     91400   19.1800 -118.9500      11.3        13       157       100
VIS    2025250     91400   19.1700 -118.9600      11.3        14       155        99
VIS    2025250     91400   19.1800 -119.0000      10.0        23       152        94
VIS    2025250     91400   19.4500 -108.7000       8.6       107       166        97
VIS    2025250     91400   19.4600 -108.7400       7.9       113       156        96
VIS    2025250     91400   19.4500 -108.7700       8.0       117       155        98
VIS    2025250     91400   19.4600 -108.7800       8.4       120       156        92
VIS    2025250     91400   19.4500 -108.9400       5.2       116       160        97
VIS    2025250     91400   19.4400 -108.9900       5.8       113       164        92
VIS    2025250     91400   19.4500 -109.0600       5.5       105       183        99
VIS    2025250     91400   19.4300 -109.0900       6.0        95       185        94
VIS    2025250     91400   19.3900 -110.9600       7.9       111       145        98
VIS    2025250     91400   19.3800 -110.9900       7.1       114       142        93
VIS    2025250     91400   19.3900 -111.0100       6.6       116       145        93
VIS    2025250     91400   19.3700 -111.0700       6.5       107       143        99
VIS    2025250     91400   19.3700 -111.0700       6.1       107       143        99
VIS    2025250     91400   19.3700 -111.1100       4.9       101       146       100
VIS    2025250     91400   19.3700 -111.1300       4.5       100       153       100
VIS    2025250     91400   19.3500 -111.6600       8.9        92       144       100
VIS    2025250     91400   19.3700 -111.6900       8.4        90       148       100
VIS    2025250     91400   19.3500 -111.7000       8.9        93       148       100
VIS    2025250     91400   19.3500 -111.7400       6.1        92       154        94
VIS    2025250     91400   19.3500 -111.7700       6.1        96       154       100
VIS    2025250     91400   19.3500 -111.7900       7.8        96       155       100
VIS    2025250     91400   19.3400 -111.8400       8.9        93       154       100
VIS    2025250     91400   19.3400 -111.8500       9.0        93       154       100
VIS    2025250     91400   19.3600 -111.8900       8.9        94       154       100
VIS    2025250     91400   19.3500 -111.9200       8.2        99       153        96
VIS    2025250     91400   19.3400 -111.9400       7.8       100       151        95
VIS    2025250     91400   19.3500 -111.9800       8.2       100       152        96
VIS    2025250     91400   19.3400 -112.0100       9.2       106       153        93
VIS    2025250     91400   19.3400 -112.0400       9.3       109       152        93
VIS    2025250     91400   19.3500 -112.0500       8.9       103       157       100
VIS    2025250     91400   19.3300 -112.1000       8.3       109       156       100
VIS    2025250     91400   19.3400 -112.1300       7.4       109       154       100
VIS    2025250     91400   19.3300 -112.1400       7.4       107       154        99
VIS    2025250     91400   19.3500 -112.2500       7.1       100       150       100
VIS    2025250     91400   19.3500 -112.2700       6.2       100       150        99
VIS    2025250     91400   19.3200 -112.8700       7.9       154       140        99
VIS    2025250     91400   19.3100 -112.8800       8.7       152       138        99
VIS    2025250     91400   19.3100 -112.9100       8.5       151       137       100
VIS    2025250     91400   19.3100 -112.9400       7.7       152       133       100
VIS    2025250     91400   19.3100 -112.9900       7.1       165       130        94
VIS    2025250     91400   19.3100 -112.9900       7.0       166       130        96
VIS    2025250     91400   19.2700 -114.2700       4.7        39       128        97
VIS    2025250     91400   19.2600 -114.7200       8.0       166       152        91
VIS    2025250     91400   19.2500 -115.4600       8.7       141       177        97
VIS    2025250     91400   19.2500 -115.4900       9.2       132       177        99
VIS    2025250     91400   19.2500 -115.5200       8.9       131       180        99
VIS    2025250     91400   19.2500 -115.5400       8.6       144       185       100
VIS    2025250     91400   19.2300 -115.7400       5.6       168       186        97
VIS    2025250     91400   19.2300 -115.8500       6.5       166       168        95
VIS    2025250     91400   19.2400 -115.8700       6.7       163       166        98
VIS    2025250     91400   19.2300 -116.0700       5.3       131       142        98
VIS    2025250     91400   19.2100 -116.1200       4.8       138       136        97
VIS    2025250     91400   19.2300 -116.1500       5.7       131       135        99
VIS    2025250     91400   19.2000 -116.4700       4.0       228       174       100
VIS    2025250     91400   19.2000 -116.7000       7.1       194       181        97
VIS    2025250     91400   19.1600 -118.0500       5.1        38       166       100
VIS    2025250     91400   19.1700 -118.0900       5.8        46       163       100
VIS    2025250     91400   19.1800 -118.0900       5.7        42       161       100
VIS    2025250     91400   19.1700 -118.1200       5.7        36       163       100
VIS    2025250     91400   19.1800 -118.1700       5.4        30       168        98
VIS    2025250     91400   19.1700 -118.1800       5.1        35       169       100
VIS    2025250     91400   19.1600 -118.2100       4.7        28       170       100
VIS    2025250     91400   19.1600 -118.2300       4.8        33       174        96
VIS    2025250     91400   19.1800 -118.3600       7.8        20       182        99
VIS    2025250     91400   19.1500 -118.3800       7.5        20       183       100
VIS    2025250     91400   19.1600 -118.6000       4.9        73       176        96
VIS    2025250     91400   19.1600 -118.9300      11.7        19       158        99
VIS    2025250     91400   19.1500 -118.9400      11.9        17       155       100
VIS    2025250     91400   19.1500 -118.9600      12.0        17       155       100
VIS    2025250     91400   19.1400 -119.0000      11.3        26       153        98
VIS    2025250     91400   19.4400 -108.6900       8.6        99       166       100
VIS    2025250     91400   19.4400 -108.7000       8.6       105       164        99
VIS    2025250     91400   19.4300 -108.7600       9.1       111       154        99
VIS    2025250     91400   19.4300 -108.7700       8.6       115       154        98
VIS    2025250     91400   19.4200 -108.8000       7.0       103       153        90
VIS    2025250     91400   19.4300 -108.8400       5.6       111       155        99
VIS    2025250     91400   19.4300 -108.9000       4.4       113       158        99
VIS    2025250     91400   19.4200 -108.9400       5.1       113       160        93
VIS    2025250     91400   19.4300 -108.9600       5.5       112       162        96
VIS    2025250     91400   19.3700 -110.9700       8.0       109       145        96
VIS    2025250     91400   19.3600 -110.9800       7.5       111       145        91
VIS    2025250     91400   19.3600 -111.0400       6.8       107       143        91
VIS    2025250     91400   19.3600 -111.0700       6.5       104       143        98
VIS    2025250     91400   19.3600 -111.0900       6.0       102       143        99
VIS    2025250     91400   19.3400 -111.1400       5.6       104       147        96
VIS    2025250     91400   19.3400 -111.1700       6.2       100       148       100
VIS    2025250     91400   19.3400 -111.1900       6.3        95       148        96
VIS    2025250     91400   19.3400 -111.2300       6.6        92       158       100
VIS    2025250     91400   19.3300 -111.4900       9.7        98       146        90
VIS    2025250     91400   19.3200 -111.6800       9.3        94       143       100
VIS    2025250     91400   19.3200 -111.6900       9.2        94       143       100
VIS    2025250     91400   19.3300 -111.7700       6.8        94       155        95
VIS    2025250     91400   19.3300 -111.8000       8.0        95       155       100
VIS    2025250     91400   19.3200 -111.8300       9.0        95       155        99
VIS    2025250     91400   19.3200 -111.8600       9.0        95       154       100
VIS    2025250     91400   19.3200 -111.8900       9.1        95       156       100
VIS    2025250     91400   19.3100 -111.9000       9.1        96       156       100
VIS    2025250     91400   19.3300 -111.9300       8.3        99       152        95
VIS    2025250     91400   19.3300 -111.9700       8.2       104       152        97
VIS    2025250     91400   19.3300 -111.9900       8.8       103       152        95
VIS    2025250     91400   19.3100 -112.0700       8.4       109       153        90
VIS    2025250     91400   19.3300 -112.1000       8.3       108       155       100
VIS    2025250     91400   19.3100 -112.1300       7.8       102       155        97
VIS    2025250     91400   19.3300 -112.1400       7.6       106       155        99
VIS    2025250     91400   19.2900 -112.8200       6.6       165       146        99
VIS    2025250     91400   19.2900 -112.8400       7.2       165       145       100
VIS    2025250     91400   19.3000 -112.8900       8.6       152       138        99
VIS    2025250     91400   19.2900 -112.9000       8.0       154       137       100
VIS    2025250     91400   19.2900 -112.9400       7.8       155       133        96
VIS    2025250     91400   19.2900 -112.9700       7.6       159       131       100
VIS    2025250     91400   19.2900 -113.0100       8.0       165       130       100
VIS    2025250     91400   19.2800 -113.0200       8.1       164       129       100
VIS    2025250     91400   19.2500 -114.2800       4.5        28       129        98
VIS    2025250     91400   19.2600 -114.3000       4.2        21       131        97
VIS    2025250     91400   19.2300 -114.8000       9.7       152       164        93
VIS    2025250     91400   19.2300 -115.4400       8.7       143       181        99
VIS    2025250     91400   19.2300 -115.4500       9.0       143       181        99
VIS    2025250     91400   19.2200 -115.5000      10.1       139       184       100
VIS    2025250     91400   19.2200 -115.5300       9.0       139       183       100
VIS    2025250     91400   19.2000 -115.5600       8.2       151       184        99
VIS    2025250     91400   19.2000 -115.5800       8.1       160       186       100
VIS    2025250     91400   19.2200 -115.7400       6.6       163       186        95
VIS    2025250     91400   19.2100 -115.8300       5.9       172       174        91
VIS    2025250     91400   19.2000 -115.8500       4.8       177       170        97
VIS    2025250     91400   19.2000 -115.9400       6.6       169       160       100
VIS    2025250     91400   19.2000 -115.9700       5.3       173       158       100
VIS    2025250     91400   19.1900 -116.0900       4.7       145       142        99
VIS    2025250     91400   19.2000 -116.1100       4.8       140       136        95
VIS    2025250     91400   19.2000 -116.1300       4.9       139       136        93
VIS    2025250     91400   19.1800 -116.4100       4.0       230       165       100
VIS    2025250     91400   19.1800 -116.4300       4.3       240       166       100
VIS    2025250     91400   19.2000 -116.4700       4.1       227       174       100
VIS    2025250     91400   19.1800 -116.6800       8.1       194       181        98
VIS    2025250     91400   19.1700 -116.9400       9.8       228       184        91
VIS    2025250     91400   19.1600 -118.0400       5.5        29       166       100
VIS    2025250     91400   19.1600 -118.0700       5.4        44       166        98
VIS    2025250     91400   19.1500 -118.0900       5.7        43       166        97
VIS    2025250     91400   19.1500 -118.1200       5.4        37       168       100
VIS    2025250     91400   19.1400 -118.1500       5.0        26       171        96
VIS    2025250     91400   19.1300 -118.1700       4.7        26       171        94
VIS    2025250     91400   19.1500 -118.2000       4.7        26       169       100
VIS    2025250     91400   19.1400 -118.2300       4.9        31       178        96
VIS    2025250     91400   19.1500 -118.2600       5.3        44       171        93
VIS    2025250     91400   19.1400 -118.2900       4.9        48       179       100
VIS    2025250     91400   19.1500 -118.3800       7.3        22       186        99
VIS    2025250     91400   19.1500 -118.3800       7.2        22       186        98
VIS    2025250     91400   19.1400 -118.6200       5.1        52       174       100
VIS    2025250     91400   19.1200 -118.9200      11.4        29       156       100
VIS    2025250     91400   19.1300 -118.9400      11.8        24       155       100
VIS    2025250     91400   19.1200 -118.9500      12.2        23       153        98
VIS    2025250     91400   19.1100 -118.9900      12.6        20       154       100
VIS    2025250     91400   19.4000 -108.7300       9.3        91       159        97
VIS    2025250     91400   19.4100 -108.8000       7.0       104       153        90
VIS    2025250     91400   19.4000 -108.8500       5.2       106       155       100
VIS    2025250     91400   19.3800 -109.0800       8.0        88       178        90
VIS    2025250     91400   19.3300 -110.5600      11.3        11       717       100
VIS    2025250     91400   19.3400 -110.5900      11.4        10       740        98
VIS    2025250     91400   19.3300 -110.6000      11.6         9       728        98
VIS    2025250     91400   19.3300 -110.9300       8.9       109       145        98
VIS    2025250     91400   19.3300 -110.9600       8.4       105       145        95
VIS    2025250     91400   19.3400 -111.0700       7.4       102       143        97
VIS    2025250     91400   19.3200 -111.1000       7.4       100       142        99
VIS    2025250     91400   19.3200 -111.1300       6.0       101       142        95
VIS    2025250     91400   19.3100 -111.1400       5.8       100       143        96
VIS    2025250     91400   19.3300 -111.1700       6.0        99       148       100
VIS    2025250     91400   19.3300 -111.1900       5.9        93       148        94
VIS    2025250     91400   19.3100 -111.6700       9.2        95       143       100
VIS    2025250     91400   19.3200 -111.6900       9.2        94       142       100
VIS    2025250     91400   19.3100 -111.7200       9.0        94       143        99
VIS    2025250     91400   19.3000 -111.8200       7.4        90       157        97
VIS    2025250     91400   19.3100 -111.8300       8.9        96       157       100
VIS    2025250     91400   19.3100 -111.8500       8.8        96       157       100
VIS    2025250     91400   19.2900 -111.9000       9.1        97       156       100
VIS    2025250     91400   19.2900 -111.9100       9.1        97       156       100
VIS    2025250     91400   19.2900 -111.9700       8.8       105       151       100
VIS    2025250     91400   19.2900 -111.9700       8.7       106       151       100
VIS    2025250     91400   19.3000 -112.0100       8.2       104       151        96
VIS    2025250     91400   19.2900 -112.0800       7.2       109       153        94
VIS    2025250     91400   19.2900 -112.0900       7.3       109       155        97
VIS    2025250     91400   19.3000 -112.1200       7.3       103       155        99
VIS    2025250     91400   19.2800 -112.7600       7.0       165       148        99
VIS    2025250     91400   19.2800 -112.8200       6.5       165       146        94
VIS    2025250     91400   19.2800 -112.8200       6.7       163       146        97
VIS    2025250     91400   19.2600 -112.8700       7.6       160       133        99
VIS    2025250     91400   19.2600 -112.8800       7.3       160       133       100
VIS    2025250     91400   19.2600 -112.9100       7.2       159       133       100
VIS    2025250     91400   19.2600 -112.9500       7.6       155       132        97
VIS    2025250     91400   19.2800 -112.9700       7.6       158       131       100
VIS    2025250     91400   19.2800 -113.0100       8.3       164       130       100
VIS    2025250     91400   19.1900 -115.5000       9.6       144       186        99
VIS    2025250     91400   19.1800 -115.5200       8.6       144       186        99
VIS    2025250     91400   19.1900 -115.5600       8.1       152       184        99
VIS    2025250     91400   19.2000 -115.5900       8.0       161       186       100
VIS    2025250     91400   19.2000 -115.7300       8.7       155       185       100
VIS    2025250     91400   19.1700 -115.9000       7.8       168       163       100
VIS    2025250     91400   19.1900 -115.9400       7.1       168       160        99
VIS    2025250     91400   19.1700 -115.9700       5.2       170       160       100
VIS    2025250     91400   19.1700 -116.0400       5.0       170       144       100
VIS    2025250     91400   19.1800 -116.0700       5.4       157       142        99
VIS    2025250     91400   19.1700 -116.0800       5.6       159       140       100
VIS    2025250     91400   19.1600 -116.1300       4.9       124       136        95
VIS    2025250     91400   19.1800 -116.1600       4.6       123       136        94
VIS    2025250     91400   19.1800 -116.1600       4.5       124       136        93
VIS    2025250     91400   19.1800 -116.4400       4.1       241       166       100
VIS    2025250     91400   19.1700 -116.6600      12.9       193       183        97
VIS    2025250     91400   19.1400 -117.1600       6.2       209       175        97
VIS    2025250     91400   19.1300 -118.0300       6.3        24       164        99
VIS    2025250     91400   19.1300 -118.0400       6.0        26       165        95
VIS    2025250     91400   19.1300 -118.0800       5.7        35       169        97
VIS    2025250     91400   19.1300 -118.1000       5.7        33       168        99
VIS    2025250     91400   19.1200 -118.1400       5.4        28       169        96
VIS    2025250     91400   19.1300 -118.1500       5.0        26       171        96
VIS    2025250     91400   19.1300 -118.1700       4.8        25       171        91
VIS    2025250     91400   19.1000 -118.4000       5.7        63       187        99
VIS    2025250     91400   19.1000 -118.8900      12.7        26       156        97
VIS    2025250     91400   19.1000 -118.9300      12.1        29       155       100
VIS    2025250     91400   19.1100 -118.9600      12.3        24       153        99
VIS    2025250     91400   19.1000 -118.9600      12.6        24       152        99
VIS    2025250     91400   19.1000 -118.9900      12.7        22       154       100
VIS    2025250     91400   19.3700 -108.7200       7.5       103       159        95
VIS    2025250     91400   19.3700 -108.7500       6.7       100       156        90
VIS    2025250     91400   19.3700 -108.8000       6.8        97       153        95
VIS    2025250     91400   19.3900 -108.8000       6.6       101       153        94
VIS    2025250     91400   19.3800 -108.8900       7.2        60       158        95
VIS    2025250     91400   19.3600 -108.9300       6.5        74       158        98
VIS    2025250     91400   19.3600 -108.9500       5.8        94       160        99
VIS    2025250     91400   19.3600 -109.0200       5.5        92       174        92
VIS    2025250     91400   19.3600 -109.0300       5.4        95       174        90
VIS    2025250     91400   19.3700 -109.0500       5.3        90       178        92
VIS    2025250     91400   19.3800 -109.1000       8.8        90       183        97
VIS    2025250     91400   19.3100 -110.5800      11.4        11       720       100
VIS    2025250     91400   19.3300 -110.6000      11.5        10       728        99
VIS    2025250     91400   19.3200 -110.7000      11.5       356       752        90
VIS    2025250     91400   19.3100 -110.9400       8.3       105       140        95
VIS    2025250     91400   19.3200 -110.9500       8.5       105       141        91
VIS    2025250     91400   19.3100 -110.9800       7.6        99       140        96
VIS    2025250     91400   19.3000 -111.0600       7.2        99       144        90
VIS    2025250     91400   19.3100 -111.0900       7.5        99       142       100
VIS    2025250     91400   19.2900 -111.1100       7.6       102       142        98
VIS    2025250     91400   19.3000 -111.1400       6.1        98       143        98
VIS    2025250     91400   19.2900 -111.1700       4.4        92       144        98
VIS    2025250     91400   19.2900 -111.4800       9.7        94       141        94
VIS    2025250     91400   19.2800 -111.4900       9.6        95       141        90
VIS    2025250     91400   19.2800 -111.6300       9.9        95       147        96
VIS    2025250     91400   19.2700 -111.6600       9.4        94       139       100
VIS    2025250     91400   19.2900 -111.6900       9.1        97       138        99
VIS    2025250     91400   19.2900 -111.7000       9.0        96       138        99
VIS    2025250     91400   19.2700 -111.7700       5.7        94       153        98
VIS    2025250     91400   19.2700 -111.8500       8.5        97       160        98
VIS    2025250     91400   19.2700 -111.8900       9.0        98       156       100
VIS    2025250     91400   19.2700 -111.9200       9.1        97       156       100
VIS    2025250     91400   19.2700 -111.9600       8.9       100       152       100
VIS    2025250     91400   19.2600 -111.9700       8.9       103       151       100
VIS    2025250     91400   19.2700 -112.0200       8.2       107       151        96
VIS    2025250     91400   19.2700 -112.0200       8.2       108       151        97
VIS    2025250     91400   19.2600 -112.0600       7.5       108       154        99
VIS    2025250     91400   19.2600 -112.1100       7.1       117       157        97
VIS    2025250     91400   19.2500 -112.7700       6.7       164       148        97
VIS    2025250     91400   19.2400 -112.7900       6.6       156       145        99
VIS    2025250     91400   19.2500 -112.8400       7.3       161       139        98
VIS    2025250     91400   19.2500 -112.8700       7.3       161       136       100
VIS    2025250     91400   19.2300 -112.9000       6.9       157       133        98
VIS    2025250     91400   19.2300 -112.9200       7.1       156       133        99
VIS    2025250     91400   19.2300 -112.9500       7.3       153       133        98
VIS    2025250     91400   19.2400 -112.9600       8.2       161       133       100
VIS    2025250     91400   19.1900 -114.6300       4.3       128       145        99
VIS    2025250     91400   19.1900 -114.6400       4.0       125       146        96
VIS    2025250     91400   19.1800 -114.8600       4.5       223       177        98
VIS    2025250     91400   19.1800 -114.9100       5.6       220       183        92
VIS    2025250     91400   19.1700 -115.5400       8.4       150       184        96
VIS    2025250     91400   19.1600 -115.5700       8.5       161       184       100
VIS    2025250     91400   19.1500 -115.6900       8.7       148       186        99
VIS    2025250     91400   19.1600 -115.7400       9.1       152       183        99
VIS    2025250     91400   19.1600 -115.9000       7.0       170       166        94
VIS    2025250     91400   19.1600 -115.9000       7.2       169       166        99
VIS    2025250     91400   19.1600 -115.9400       7.9       168       162        98
VIS    2025250     91400   19.1600 -115.9800       4.3       167       160        99
VIS    2025250     91400   19.1400 -116.0200       4.0       168       145        95
VIS    2025250     91400   19.1600 -116.0500       5.2       171       143       100
VIS    2025250     91400   19.1600 -116.0800       5.4       161       140       100
VIS    2025250     91400   19.1400 -116.1000       4.4       142       139        93
VIS    2025250     91400   19.1400 -116.1300       4.7       118       139        95
VIS    2025250     91400   19.1300 -116.6600      13.7       188       183        95
VIS    2025250     91400   19.1300 -117.1600       6.9       201       176        97
VIS    2025250     91400   19.0900 -118.0600       6.1        21       173        99
VIS    2025250     91400   19.1000 -118.0800       6.3        24       173        99
VIS    2025250     91400   19.1000 -118.1000       6.0        24       170        99
VIS    2025250     91400   19.1100 -118.1200       5.8        28       169        98
VIS    2025250     91400   19.1000 -118.1500       5.9        29       170        91
VIS    2025250     91400   19.1000 -118.3800       6.6        62       187       100
VIS    2025250     91400   19.1000 -118.4100       5.7        66       187       100
VIS    2025250     91400   19.0900 -118.8900      13.2        24       159        96
VIS    2025250     91400   19.0900 -118.9100      12.5        26       156        99
VIS    2025250     91400   19.0800 -118.9500      12.7        29       153        99
VIS    2025250     91400   19.0700 -118.9600      13.1        26       152        99
VIS    2025250     91400   19.0700 -119.0000      13.1        22       159        99
VIS    2025250     91400   19.3700 -108.7200       7.0       102       159        96
VIS    2025250     91400   19.3500 -108.7600       5.2        94       155        99
VIS    2025250     91400   19.3500 -108.7900       6.2       101       155       100
VIS    2025250     91400   19.3600 -108.8100       7.8       101       153        95
VIS    2025250     91400   19.3500 -108.8600       4.7        80       156       100
VIS    2025250     91400   19.3600 -108.9300       6.6        74       158        99
VIS    2025250     91400   19.3600 -108.9400       6.3        79       158       100
VIS    2025250     91400   19.3400 -109.0300       7.3        99       177        99
VIS    2025250     91400   19.3300 -109.0300       7.5        94       177        98
VIS    2025250     91400   19.3300 -109.0900       8.5        77       185       100
VIS    2025250     91400   19.2800 -110.7100      11.6       350       752        99
VIS    2025250     91400   19.3000 -110.7400      11.7       353       752        95
VIS    2025250     91400   19.3000 -110.7400      11.7       353       742        95
VIS    2025250     91400   19.2700 -110.9500       8.0       103       133        99
VIS    2025250     91400   19.2700 -110.9600       8.1       103       133        98
VIS    2025250     91400   19.2700 -110.9900       8.9       105       133        90
VIS    2025250     91400   19.2900 -111.0800       7.7       100       144        98
VIS    2025250     91400   19.2800 -111.1200       7.3       102       142        97
VIS    2025250     91400   19.2700 -111.1400       6.7        99       143        98
VIS    2025250     91400   19.2700 -111.1700       5.4        93       144        98
VIS    2025250     91400   19.2500 -111.5700       6.7       102       146       100
VIS    2025250     91400   19.2600 -111.6200       9.9        88       142        93
VIS    2025250     91400   19.2600 -111.6700       9.0        89       138        99
VIS    2025250     91400   19.2600 -111.6900       8.4        89       139        99
VIS    2025250     91400   19.2400 -111.7200       7.8        86       147        98
VIS    2025250     91400   19.2400 -111.7400       6.8        91       153        92
VIS    2025250     91400   19.2600 -111.7700       5.8        95       153        99
VIS    2025250     91400   19.2500 -111.8000       5.6        89       159        94
VIS    2025250     91400   19.2600 -111.8600       8.5        99       160        98
VIS    2025250     91400   19.2600 -111.9000       8.8        98       157       100
VIS    2025250     91400   19.2600 -111.9200       9.0        96       158       100
VIS    2025250     91400   19.2600 -111.9600       8.9       100       152       100
VIS    2025250     91400   19.2400 -111.9800       8.7       102       152       100
VIS    2025250     91400   19.2500 -112.0000       8.8       103       152       100
VIS    2025250     91400   19.2500 -112.0300       8.3       105       152        99
VIS    2025250     91400   19.2500 -112.0600       7.8       106       154        99
VIS    2025250     91400   19.2400 -112.1100       7.6       113       157        99
VIS    2025250     91400   19.2500 -112.1300       7.0       110       159        90
VIS    2025250     91400   19.2100 -112.7800       6.5       145       152        94
VIS    2025250     91400   19.2300 -112.8100       6.8       162       145       100
VIS    2025250     91400   19.2100 -112.8300       6.6       158       144        99
VIS    2025250     91400   19.2300 -112.8700       6.8       156       137        99
VIS    2025250     91400   19.2200 -112.8800       6.9       155       137        97
VIS    2025250     91400   19.2200 -112.9300       7.0       155       134        98
VIS    2025250     91400   19.2300 -112.9500       7.2       152       133        98
VIS    2025250     91400   19.2100 -113.0500       4.7       175       128        92
VIS    2025250     91400   19.2200 -113.0600       4.5       176       128        90
VIS    2025250     91400   19.1800 -114.5900       5.0       118       145        95
VIS    2025250     91400   19.1700 -114.8900       4.8       223       178        97
VIS    2025250     91400   19.1500 -114.9000       5.1       222       178        99
VIS    2025250     91400   19.1300 -115.5400       8.1       150       181       100
VIS    2025250     91400   19.1500 -115.5400       8.0       148       184        96
VIS    2025250     91400   19.1500 -115.6100       8.2       169       186        99
VIS    2025250     91400   19.1500 -115.6800       8.6       148       186        99
VIS    2025250     91400   19.1500 -115.7100       9.0       148       184        99
VIS    2025250     91400   19.1300 -115.9000       6.4       173       171        93
VIS    2025250     91400   19.1200 -115.9200       6.9       172       171        99
VIS    2025250     91400   19.1200 -115.9600       4.3       162       166        94
VIS    2025250     91400   19.1200 -115.9700       4.0       161       166        96
VIS    2025250     91400   19.1400 -116.0900       4.5       159       140        91
VIS    2025250     91400   19.1100 -116.1600       4.0        74       144        96
VIS    2025250     91400   19.0800 -118.1100       6.5        22       174        98
VIS    2025250     91400   19.0700 -118.1200       6.7        23       174        96
VIS    2025250     91400   19.0600 -118.3100       7.1        20       180        93
VIS    2025250     91400   19.0500 -118.9000      13.4        24       160        99
VIS    2025250     91400   19.0500 -118.9200      13.3        24       158        99
VIS    2025250     91400   19.0400 -118.9300      13.4        25       155       100
VIS    2025250     91400   19.0400 -118.9700      13.8        18       154       100
VIS    2025250     91400   19.0400 -118.9900      13.8        17       159       100
VIS    2025250     91400   19.3200 -108.7400       4.8        85       157        99
VIS    2025250     91400   19.3300 -108.7800       4.8        93       155        98
VIS    2025250     91400   19.3400 -108.7900       5.7        99       155       100
VIS    2025250     91400   19.3200 -108.8400       7.7       101       153        99
VIS    2025250     91400   19.3100 -108.8800       6.2        87       154        95
VIS    2025250     91400   19.3100 -108.9200       7.6        63       161        99
VIS    2025250     91400   19.3100 -109.0300       7.8        89       177       100
VIS    2025250     91400   19.3300 -109.0400       7.6        91       177       100
VIS    2025250     91400   19.3100 -109.0800       7.8        76       181        99
VIS    2025250     91400   19.3100 -109.1100       7.0        68       185       100
VIS    2025250     91400   19.2400 -110.9700       8.0       103       134        97
VIS    2025250     91400   19.2500 -111.0100       8.9       104       134        98
VIS    2025250     91400   19.2400 -111.0300       8.7       100       134        99
VIS    2025250     91400   19.2500 -111.1400       6.8       105       146        94
VIS    2025250     91400   19.2400 -111.1400       6.1       102       145        90
VIS    2025250     91400   19.2500 -111.5200      10.4       118       138       100
VIS    2025250     91400   19.2300 -111.5300       9.0       110       138       100
VIS    2025250     91400   19.2300 -111.5800       6.8       100       141       100
VIS    2025250     91400   19.2300 -111.6000       5.2        84       149        90
VIS    2025250     91400   19.2300 -111.6400       9.4        83       139        97
VIS    2025250     91400   19.2300 -111.6700       8.8        79       139        98
VIS    2025250     91400   19.2200 -111.6900       8.5        77       142        99
VIS    2025250     91400   19.2300 -111.7300       7.9        82       152        98
VIS    2025250     91400   19.2400 -111.7400       6.8        90       153        92
VIS    2025250     91400   19.2200 -111.7900       6.1        95       160        91
VIS    2025250     91400   19.2300 -111.8100       5.8        95       160       100
VIS    2025250     91400   19.2200 -111.8500       7.8        99       163       100
VIS    2025250     91400   19.2200 -111.8700       8.4       101       162        98
VIS    2025250     91400   19.2100 -111.9000       8.5       103       159        99
VIS    2025250     91400   19.2200 -111.9200       9.1       102       159        95
VIS    2025250     91400   19.2300 -111.9500       9.1       100       159        98
VIS    2025250     91400   19.2300 -111.9900       8.6       100       152       100
VIS    2025250     91400   19.2100 -112.0300       7.5        93       154       100
VIS    2025250     91400   19.2100 -112.0400       7.2        91       154        99
VIS    2025250     91400   19.2200 -112.0800       7.9        86       158        98
VIS    2025250     91400   19.2100 -112.1000       7.9        89       158        99
VIS    2025250     91400   19.2100 -112.7800       6.7       144       152        96
VIS    2025250     91400   19.1900 -112.8100       6.1       146       147        96
VIS    2025250     91400   19.2100 -112.8300       6.4       156       145       100
VIS    2025250     91400   19.1800 -112.8700       8.2       154       141        94
VIS    2025250     91400   19.2000 -112.9000       7.9       153       139        96
VIS    2025250     91400   19.2000 -112.9500       6.6       147       134        98
VIS    2025250     91400   19.1900 -113.0000       7.4       169       134       100
VIS    2025250     91400   19.1800 -113.0300       6.5       170       130        97
VIS    2025250     91400   19.1800 -113.0300       6.3       170       129        97
VIS    2025250     91400   19.1800 -113.0600       5.5       166       128        90
VIS    2025250     91400   19.1900 -113.1100       4.0       165       121        94
VIS    2025250     91400   19.1200 -115.4600       8.1       154       184        91
VIS    2025250     91400   19.1200 -115.5100       8.4       153       178        99
VIS    2025250     91400   19.1200 -115.5300       8.0       153       178        99
VIS    2025250     91400   19.1000 -115.5500       7.5       161       177       100
VIS    2025250     91400   19.1100 -115.6900       7.2       159       185        97
VIS    2025250     91400   19.1000 -115.7300       6.1       159       182        93
VIS    2025250     91400   19.1000 -115.8500       6.6       166       175        99
VIS    2025250     91400   19.1000 -115.8700       6.3       164       175        97
VIS    2025250     91400   19.1000 -115.8900       7.5       167       173        95
VIS    2025250     91400   19.1000 -115.9200       6.9       173       173        98
VIS    2025250     91400   19.1100 -115.9400       6.5       170       171       100
VIS    2025250     91400   19.0700 -117.0400       8.0       254       178        98
VIS    2025250     91400   19.0600 -118.1000       7.0        23       176        98
VIS    2025250     91400   19.0400 -118.3200       7.1        20       170        93
VIS    2025250     91400   19.0400 -118.8900      13.3        23       163       100
VIS    2025250     91400   19.0300 -118.9300      13.2        25       159        99
VIS    2025250     91400   19.0100 -118.9600      13.1        22       155       100
VIS    2025250     91400   19.0300 -118.9800      13.4        18       156       100
VIS    2025250     91400   19.0300 -119.0000      13.3        17       159       100
VIS    2025250     91400   19.0100 -119.0200      12.6        17       163       100
VIS    2025250     91400   19.3100 -108.7300       5.5        81       158        99
VIS    2025250     91400   19.3000 -108.7900       5.0        97       155        95
VIS    2025250     91400   19.3000 -108.8000       5.4        97       155        98
VIS    2025250     91400   19.2900 -108.8400       7.6       105       153        95
VIS    2025250     91400   19.2900 -108.9300       5.0        84       161        96
VIS    2025250     91400   19.3000 -109.0500       8.4        88       177        99
VIS    2025250     91400   19.3000 -109.0900       7.5        76       181        97
VIS    2025250     91400   19.3000 -109.1100       6.8        67       185       100
VIS    2025250     91400   19.3000 -109.1500       5.0        70       188        94
VIS    2025250     91400   19.2400 -110.9800       8.0       103       136        98
VIS    2025250     91400   19.2200 -111.0200       8.4       100       136        98
VIS    2025250     91400   19.2200 -111.0300       8.1        99       136        94
VIS    2025250     91400   19.2200 -111.0600       7.2        95       134        93
VIS    2025250     91400   19.2300 -111.1000       6.5        96       141        95
VIS    2025250     91400   19.2300 -111.1400       6.0        97       145        91
VIS    2025250     91400   19.2200 -111.1500       5.8        84       145        99
VIS    2025250     91400   19.2200 -111.2300       4.6        54       160        92
VIS    2025250     91400   19.2100 -111.3800       4.9       105       152        99
VIS    2025250     91400   19.2000 -111.4000       5.1       104       148       100
VIS    2025250     91400   19.2200 -111.5200      10.1       110       136        97
VIS    2025250     91400   19.2000 -111.5600       8.1       105       138        95
VIS    2025250     91400   19.2000 -111.5700       7.6       105       138        96
VIS    2025250     91400   19.2000 -111.6000       6.4        97       148        94
VIS    2025250     91400   19.2100 -111.6500       9.1        81       142        96
VIS    2025250     91400   19.2000 -111.6600       8.9        80       142        97
VIS    2025250     91400   19.2200 -111.6900       8.5        76       139        98
VIS    2025250     91400   19.2100 -111.7100       8.3        74       147        98
VIS    2025250     91400   19.1900 -111.8600       8.2       101       162        99
VIS    2025250     91400   19.1900 -111.8600       8.1       100       161        99
VIS    2025250     91400   19.2000 -111.9100       8.5       102       157       100
VIS    2025250     91400   19.2000 -111.9300       8.7       101       157       100
VIS    2025250     91400   19.1900 -111.9500       8.9       101       157       100
VIS    2025250     91400   19.1900 -111.9900       8.6       100       155       100
VIS    2025250     91400   19.2000 -112.0300       7.4        92       154       100
VIS    2025250     91400   19.1900 -112.0500       6.5        87       158        93
VIS    2025250     91400   19.2000 -112.0700       7.0        85       158        94
VIS    2025250     91400   19.1800 -112.8000       6.4       146       153        94
VIS    2025250     91400   19.1800 -112.8400       6.4       148       144       100
VIS    2025250     91400   19.1600 -112.8700       7.5       155       139        91
VIS    2025250     91400   19.1500 -113.0100       6.7       170       135        98
VIS    2025250     91400   19.1600 -113.0100       6.8       170       134       100
VIS    2025250     91400   19.1700 -113.0400       6.3       173       130       100
VIS    2025250     91400   19.1200 -114.4000       8.9       172       145       100
VIS    2025250     91400   19.1200 -114.4500       8.4       171       145        99
VIS    2025250     91400   19.1000 -114.7600      11.2       174       154        90
VIS    2025250     91400   19.0900 -115.4700       9.0       152       178       100
VIS    2025250     91400   19.1000 -115.5100       7.9       156       176        95
VIS    2025250     91400   19.0900 -115.5400       7.3       162       176        98
VIS    2025250     91400   19.0900 -115.5600       7.2       168       176       100
VIS    2025250     91400   19.0900 -115.6600       7.6       167       186       100
VIS    2025250     91400   19.0800 -115.8200       6.6       177       178        97
VIS    2025250     91400   19.0900 -115.8400       6.5       169       175       100
VIS    2025250     91400   19.0800 -115.8900       7.9       166       175        93
VIS    2025250     91400   19.0900 -115.8900       7.6       167       174        96
VIS    2025250     91400   19.0900 -115.9200       7.0       175       175        96
VIS    2025250     91400   19.0600 -116.1400       4.9       168       147       100
VIS    2025250     91400   19.0500 -116.6800       4.4       296       180        92
VIS    2025250     91400   19.0100 -118.5700       5.1       169       187        96
VIS    2025250     91400   19.0000 -118.9000      11.4        28       167        98
VIS    2025250     91400   19.0000 -118.9200      12.3        25       163        99
VIS    2025250     91400   18.9900 -118.9500      13.3        21       159       100
VIS    2025250     91400   19.0100 -118.9800      13.0        21       156       100
VIS    2025250     91400   19.0100 -119.0100      12.6        17       161       100
VIS    2025250     91400   18.9900 -119.0200      12.0        15       161       100
VIS    2025250     91400   19.0000 -119.0500      12.6        14       164       100
VIS    2025250     91400   19.2800 -108.7600       7.0        95       156        98
VIS    2025250     91400   19.2800 -108.7700       6.6        97       155        98
VIS    2025250     91400   19.2900 -108.8000       5.9       100       154       100
VIS    2025250     91400   19.2800 -108.8400       7.1       104       153        90
VIS    2025250     91400   19.2800 -108.9600       4.5        76       166        99
VIS    2025250     91400   19.2700 -109.0400       7.0        89       176       100
VIS    2025250     91400   19.2600 -109.0600       7.3        87       178       100
VIS    2025250     91400   19.2600 -109.1000       7.0        77       178        98
VIS    2025250     91400   19.2700 -109.1500       5.1        68       186        94
VIS    2025250     91400   19.2100 -111.0200       8.4       100       141       100
VIS    2025250     91400   19.2100 -111.0400       8.2        96       136        99
VIS    2025250     91400   19.2100 -111.0600       7.6        94       134        99
VIS    2025250     91400   19.2100 -111.1500       5.9        79       146        99
VIS    2025250     91400   19.2000 -111.1900       5.2        66       148        99
VIS    2025250     91400   19.1900 -111.4200       5.1        96       147        97
VIS    2025250     91400   19.1900 -111.4200       5.3        86       147        98
VIS    2025250     91400   19.1800 -111.5000       9.6       101       134        91
VIS    2025250     91400   19.1800 -111.6300       8.0        87       147        97
VIS    2025250     91400   19.1800 -111.6300       8.1        86       147        96
VIS    2025250     91400   19.1900 -111.6600       8.9        80       142        97
VIS    2025250     91400   19.1700 -111.7100       8.7        76       145       100
VIS    2025250     91400   19.1800 -111.7400       8.5        78       152        95
VIS    2025250     91400   19.1700 -111.7800       8.7        81       158        90
VIS    2025250     91400   19.1800 -111.8600       8.2       101       162        99
VIS    2025250     91400   19.1800 -111.8700       8.3       101       160        99
VIS    2025250     91400   19.1800 -111.9200       8.6       102       155       100
VIS    2025250     91400   19.1600 -111.9500       8.9       101       153        99
VIS    2025250     91400   19.1700 -111.9800       9.1       100       155       100
VIS    2025250     91400   19.1600 -111.9900       9.0       100       153        99
VIS    2025250     91400   19.1700 -112.0300       7.9        93       153        98
VIS    2025250     91400   19.1600 -112.0700       8.5        95       161       100
VIS    2025250     91400   19.1400 -112.8200       5.2       144       155        92
VIS    2025250     91400   19.1300 -112.8400       5.1       138       149        94
VIS    2025250     91400   19.1400 -112.9700       6.1       164       137        99
VIS    2025250     91400   19.1500 -113.0000       6.3       169       136       100
VIS    2025250     91400   19.1300 -113.0400       4.7       168       133        99
VIS    2025250     91400   19.0900 -114.7600      10.8       177       154        94
VIS    2025250     91400   19.0800 -114.7800      11.8       182       154        97
VIS    2025250     91400   19.0900 -114.8000      10.6       179       157        99
VIS    2025250     91400   19.0900 -114.8500       5.7       171       173        94
VIS    2025250     91400   19.0800 -115.4500      10.3       143       186        93
VIS    2025250     91400   19.0700 -115.4900       8.3       153       176        99
VIS    2025250     91400   19.0600 -115.5300       7.9       164       174        98
VIS    2025250     91400   19.0600 -115.5300       7.8       165       174        99
VIS    2025250     91400   19.0700 -115.5600       7.2       170       175       100
VIS    2025250     91400   19.0500 -115.5900       6.5       173       176        98
VIS    2025250     91400   19.0600 -115.6300       6.7       171       185       100
VIS    2025250     91400   19.0700 -115.6500       6.9       173       186        99
VIS    2025250     91400   19.0500 -115.6800       7.4       178       186        96
VIS    2025250     91400   19.0700 -115.7000       7.7       167       185        96
VIS    2025250     91400   19.0600 -116.1100       4.0       167       145       100
VIS    2025250     91400   19.0500 -116.1400       5.0       169       151       100
VIS    2025250     91400   19.0600 -116.1500       5.2       170       151       100
VIS    2025250     91400   19.0400 -116.6900       5.1       301       180        95
VIS    2025250     91400   18.9800 -119.0000      12.3        17       161       100
VIS    2025250     91400   18.9800 -119.0200      11.8        13       163       100
VIS    2025250     91400   18.9700 -119.0700      13.9         0       168       100
VIS    2025250     91400   18.9700 -119.0900      13.8         2       169       100
VIS    2025250     91400   19.2400 -108.7700       9.0        88       160       100
VIS    2025250     91400   19.2400 -108.7800       9.0        89       160       100
VIS    2025250     91400   19.2500 -108.8100       7.2        96       157        97
VIS    2025250     91400   19.2500 -108.8700       5.2       100       154        90
VIS    2025250     91400   19.2600 -108.8900       4.8        92       154       100
VIS    2025250     91400   19.2500 -109.0500       6.3        86       177        99
VIS    2025250     91400   19.2500 -109.0700       6.6        83       178       100
VIS    2025250     91400   19.2400 -109.0900       6.3        81       181        99
VIS    2025250     91400   19.2300 -109.1600       8.0        62       187       100
VIS    2025250     91400   19.1700 -111.0300       8.9       105       145       100
VIS    2025250     91400   19.1600 -111.0700       8.4       102       140       100
VIS    2025250     91400   19.1600 -111.0800       8.1       101       139        99
VIS    2025250     91400   19.1700 -111.1000       7.7        91       138        98
VIS    2025250     91400   19.1700 -111.1500       6.9        75       148        93
VIS    2025250     91400   19.1600 -111.1600       6.9        75       148        96
VIS    2025250     91400   19.1600 -111.1900       6.2        69       150        92
VIS    2025250     91400   19.1600 -111.3700       6.4       112       150        99
VIS    2025250     91400   19.1600 -111.3700       6.2       108       150        98
VIS    2025250     91400   19.1700 -111.4300       5.3        78       147        90
VIS    2025250     91400   19.1600 -111.5000       9.7       102       134       100
VIS    2025250     91400   19.1600 -111.5300       9.2       100       135        99
VIS    2025250     91400   19.1600 -111.6100       8.5        97       147        94
VIS    2025250     91400   19.1700 -111.6600       9.0        80       142        99
VIS    2025250     91400   19.1500 -111.6700       9.0        77       142        98
VIS    2025250     91400   19.1600 -111.7000       8.8        76       144       100
VIS    2025250     91400   19.1500 -111.7400       8.7        84       154        99
VIS    2025250     91400   19.1600 -111.7700       9.0        81       158        92
VIS    2025250     91400   19.1500 -111.8000       9.4        80       161        94
VIS    2025250     91400   19.1400 -111.8500       7.3        99       159       100
VIS    2025250     91400   19.1600 -111.8700       8.1       101       159       100
VIS    2025250     91400   19.1400 -111.9200       9.0       103       153       100
VIS    2025250     91400   19.1600 -111.9500       8.9       101       153        99
VIS    2025250     91400   19.1400 -111.9800       9.1        99       153        99
VIS    2025250     91400   19.1600 -112.0000       8.9        98       153       100
VIS    2025250     91400   19.1300 -112.0300       8.1        89       156        99
VIS    2025250     91400   19.1500 -112.0700       8.7        96       161       100
VIS    2025250     91400   19.1300 -112.7800       4.6       158       159        94
VIS    2025250     91400   19.1300 -112.9500       5.6       159       140        91
VIS    2025250     91400   19.1200 -113.0100       6.2       170       136        99
VIS    2025250     91400   19.0500 -114.7700      11.5       185       155        96
VIS    2025250     91400   19.0700 -114.7900      11.5       186       157        99
VIS    2025250     91400   19.0400 -115.5000       7.9       157       172        91
VIS    2025250     91400   19.0300 -115.5200       9.3       164       174       100
VIS    2025250     91400   19.0300 -115.5600       8.6       170       174        97
VIS    2025250     91400   19.0300 -115.5700       8.0       170       174        97
VIS    2025250     91400   19.0400 -115.5900       6.8       171       175        99
VIS    2025250     91400   19.0500 -115.6400       6.7       170       180       100
VIS    2025250     91400   19.0300 -115.6700       6.5       180       186        95
VIS    2025250     91400   19.0300 -115.7800       8.5       180       186        93
VIS    2025250     91400   19.0300 -115.8900       6.5       170       181        98
VIS    2025250     91400   19.0200 -115.9100       7.4       180       181        98
VIS    2025250     91400   19.0100 -116.7200       4.7       296       182        96
VIS    2025250     91400   19.0000 -116.7500       5.6       298       180        91
VIS    2025250     91400   19.0000 -116.7700       6.0       297       181        94
VIS    2025250     91400   19.0000 -116.8000       7.7       299       182        96
VIS    2025250     91400   18.9500 -119.0200      12.5        14       168        98
VIS    2025250     91400   18.9500 -119.0800      13.2         2       168       100
VIS    2025250     91400   18.9500 -119.0900      13.4         4       168       100
VIS    2025250     91400   19.2400 -108.7800       8.9        89       160       100
VIS    2025250     91400   19.2100 -108.8400       5.5        87       159        97
VIS    2025250     91400   19.2300 -108.8700       4.9        92       155        99
VIS    2025250     91400   19.2300 -108.8900       4.9        97       156        92
VIS    2025250     91400   19.2200 -108.9500       6.2        90       162        91
VIS    2025250     91400   19.2100 -109.0200       4.8        81       170        93
VIS    2025250     91400   19.2200 -109.0400       4.9        79       171        93
VIS    2025250     91400   19.2200 -109.0800       4.5        65       180        93
VIS    2025250     91400   19.1500 -111.0700       8.2       101       141        99
VIS    2025250     91400   19.1500 -111.1200       8.0        86       148        92
VIS    2025250     91400   19.1600 -111.1600       7.0        72       148        92
VIS    2025250     91400   19.1600 -111.1600       6.9        74       148        95
VIS    2025250     91400   19.1300 -111.3900       6.3       122       147        98
VIS    2025250     91400   19.1500 -111.5000       9.5       103       133        99
VIS    2025250     91400   19.1400 -111.6300       8.3        84       148        99
VIS    2025250     91400   19.1300 -111.6500       8.7        83       146        99
VIS    2025250     91400   19.1200 -111.7000       8.7        75       140       100
VIS    2025250     91400   19.1200 -111.7100       8.4        74       139       100
VIS    2025250     91400   19.1300 -111.7600       8.3        83       154       100
VIS    2025250     91400   19.1200 -111.7700       8.5        81       154        99
VIS    2025250     91400   19.1200 -111.8100       8.6        82       161        99
VIS    2025250     91400   19.1200 -111.8400       7.7        89       157       100
VIS    2025250     91400   19.1300 -111.8500       7.3        96       159        99
VIS    2025250     91400   19.1200 -111.9000       9.2       103       154       100
VIS    2025250     91400   19.1100 -111.9200       8.8       101       153       100
VIS    2025250     91400   19.1100 -111.9500       8.7        99       153       100
VIS    2025250     91400   19.1200 -111.9900       8.8        96       152       100
VIS    2025250     91400   19.1100 -112.0000       8.7        95       152       100
VIS    2025250     91400   19.1300 -112.0300       8.3        90       155        99
VIS    2025250     91400   19.1300 -112.0700       8.9        98       160       100
VIS    2025250     91400   19.1100 -112.0900       9.4       100       158       100
VIS    2025250     91400   19.1000 -112.7700       5.9       148       153        98
VIS    2025250     91400   19.1100 -112.7900       6.0       158       156        92
VIS    2025250     91400   19.0900 -112.9800       7.0       173       140        98
VIS    2025250     91400   19.0900 -113.0100       7.1       172       136        97
VIS    2025250     91400   19.0800 -113.1400       7.2       156       129        96
VIS    2025250     91400   19.0800 -113.5900       4.6       344       110        94
VIS    2025250     91400   19.0400 -114.5900      11.4       185       145        99
VIS    2025250     91400   19.0400 -114.6100      12.0       182       145        99
VIS    2025250     91400   19.0400 -114.7700      11.7       185       154        90
VIS    2025250     91400   19.0400 -114.7900      11.0       190       160       100
VIS    2025250     91400   19.0300 -114.8300       9.5       194       169       100
VIS    2025250     91400   19.0400 -114.8700       5.6       177       178       100
VIS    2025250     91400   19.0000 -115.5400       9.2       171       169        99
VIS    2025250     91400   19.0000 -115.5400       9.1       171       170       100
VIS    2025250     91400   19.0100 -115.5700       8.7       170       172        95
VIS    2025250     91400   19.0100 -115.6000       6.7       168       172       100
VIS    2025250     91400   19.0100 -115.6300       5.9       167       174        92
VIS    2025250     91400   19.0100 -115.7900      11.6       188       185        99
VIS    2025250     91400   19.0000 -115.8700       7.9       168       180        97
VIS    2025250     91400   19.0100 -115.8900       6.5       175       182       100
VIS    2025250     91400   18.9900 -115.9200       7.4       178       180        99
VIS    2025250     91400   19.0000 -115.9400       7.0       183       174        96
VIS    2025250     91400   18.9900 -115.9600       6.3       189       168        95
VIS    2025250     91400   18.9500 -118.4200       8.4        15       180        99
VIS    2025250     91400   18.9400 -118.4400       9.1        12       180        99
VIS    2025250     91400   18.9300 -118.4800       9.1        46       184       100
VIS    2025250     91400   18.9500 -118.4900       8.5        55       186        97
VIS    2025250     91400   18.9300 -119.0800      13.4         1       167        99
VIS    2025250     91400   18.9200 -119.1000      13.7         3       167        99
VIS    2025250     91400   18.9100 -119.1200      13.7         3       165       100
VIS    2025250     91400   18.9100 -119.1600      13.5         1       166        97
VIS    2025250     91400   19.2100 -108.1600      10.0       112       162        99
VIS    2025250     91400   19.2100 -108.2100       9.6       111       161        91
VIS    2025250     91400   19.2100 -108.8000       9.0        90       160        97
VIS    2025250     91400   19.2000 -108.8500       6.1        84       160        96
VIS    2025250     91400   19.2000 -108.8800       5.9        88       160       100
VIS    2025250     91400   19.2000 -108.9100       5.7        93       161        91
VIS    2025250     91400   19.1800 -108.9600       5.0        90       163        91
VIS    2025250     91400   19.2000 -108.9800       5.6        88       164        95
VIS    2025250     91400   19.1800 -109.0400       4.4        79       171       100
VIS    2025250     91400   19.2000 -109.0400       4.4        77       171        98
VIS    2025250     91400   19.1800 -109.0900       4.3        53       177        97
VIS    2025250     91400   19.1300 -111.1300       7.8        84       150        98
VIS    2025250     91400   19.1300 -111.1500       7.5        74       150        99
VIS    2025250     91400   19.1100 -111.2000       7.8       116       152        99
VIS    2025250     91400   19.1300 -111.2000       7.5       108       152        97
VIS    2025250     91400   19.1100 -111.3800       5.6       115       149        98
VIS    2025250     91400   19.1200 -111.3800       6.3       121       149        99
VIS    2025250     91400   19.1000 -111.5800       9.1        95       143        93
VIS    2025250     91400   19.1000 -111.6100       8.8        82       145        98
VIS    2025250     91400   19.1000 -111.6400       8.1        80       146        95
VIS    2025250     91400   19.1200 -111.6700       8.9        80       145       100
VIS    2025250     91400   19.1100 -111.7000       8.7        75       140       100
VIS    2025250     91400   19.1100 -111.7200       8.2        73       139       100
VIS    2025250     91400   19.1000 -111.7600       7.8        77       151       100
VIS    2025250     91400   19.1000 -111.7700       7.9        79       151       100
VIS    2025250     91400   19.1100 -111.8000       8.3        83       159        97
VIS    2025250     91400   19.0900 -111.8500       8.3        95       155       100
VIS    2025250     91400   19.0900 -111.8600       8.3        96       155       100
VIS    2025250     91400   19.0900 -111.9100       8.3       100       155       100
VIS    2025250     91400   19.1100 -111.9300       8.7       100       153       100
VIS    2025250     91400   19.0900 -111.9500       8.3        99       154       100
VIS    2025250     91400   19.1100 -112.0000       8.7        95       152       100
VIS    2025250     91400   19.0800 -112.0100       8.6        93       157       100
VIS    2025250     91400   19.0800 -112.0600       8.7        96       161       100
VIS    2025250     91400   19.1000 -112.0900       9.4        99       158       100
VIS    2025250     91400   19.0600 -112.7400       6.1       134       145        94
VIS    2025250     91400   19.0700 -112.7600       6.1       143       145        99
VIS    2025250     91400   19.0800 -112.7700       6.5       150       145       100
VIS    2025250     91400   19.0700 -112.9600       6.6       162       143        92
VIS    2025250     91400   19.0700 -112.9700       6.4       165       140        99
VIS    2025250     91400   19.0500 -113.0200       6.5       161       137       100
VIS    2025250     91400   19.0500 -113.0400       7.2       153       136        95
VIS    2025250     91400   19.0400 -113.6200       4.6       358       113        99
VIS    2025250     91400   19.0200 -114.5100      10.5       196       147        96
VIS    2025250     91400   19.0100 -114.5500       9.4       191       146       100
VIS    2025250     91400   19.0300 -114.5700       9.0       194       145        92
VIS    2025250     91400   19.0100 -114.6000      11.1       183       145        99
VIS    2025250     91400   19.0200 -114.6200      11.7       182       145       100
VIS    2025250     91400   19.0200 -114.7400      12.5       186       154        95
VIS    2025250     91400   19.0000 -114.7600      12.8       185       154        98
VIS    2025250     91400   19.0200 -114.7800      12.4       187       158        97
VIS    2025250     91400   18.9800 -115.4400       8.5       152       185        98
VIS    2025250     91400   18.9900 -115.4800      13.3       163       173        90
VIS    2025250     91400   19.0000 -115.5300       9.3       173       169        95
VIS    2025250     91400   18.9800 -115.7400       9.5       190       184       100
VIS    2025250     91400   18.9900 -115.7400       9.9       189       185       100
VIS    2025250     91400   18.9900 -115.8700       8.1       171       186        98
VIS    2025250     91400   18.9900 -115.9000       7.8       173       182        99
VIS    2025250     91400   18.9900 -115.9200       7.6       178       180       100
VIS    2025250     91400   18.9900 -115.9600       6.2       185       168        98
VIS    2025250     91400   18.9900 -115.9600       6.0       187       168        96
VIS    2025250     91400   18.9100 -118.4400       9.9        31       179        98
VIS    2025250     91400   18.9100 -118.9300       9.9        25       168        98
VIS    2025250     91400   18.9000 -118.9700       9.8        30       170        95
VIS    2025250     91400   18.8900 -119.0600      13.7         5       164        98
VIS    2025250     91400   18.8900 -119.0700      13.8         4       161        98
VIS    2025250     91400   18.8900 -119.1100      13.7         6       163       100
VIS    2025250     91400   18.8900 -119.1200      13.5         5       163       100
VIS    2025250     91400   18.9100 -119.1400      13.5         3       166        99
VIS    2025250     91400   18.8900 -119.1700      12.8         3       166        99
VIS    2025250     91400   19.1900 -108.1700       9.0       112       161        93
VIS    2025250     91400   19.1900 -108.1800       9.0       111       161        92
VIS    2025250     91400   19.1900 -108.2100       8.8       109       161        93
VIS    2025250     91400   19.1700 -108.7900       8.5        93       166       100
VIS    2025250     91400   19.1900 -108.8000       8.8        93       165       100
VIS    2025250     91400   19.1700 -108.8300       8.3        92       166        99
VIS    2025250     91400   19.1800 -108.8600       6.5        88       165        97
VIS    2025250     91400   19.1600 -108.9000       5.3        78       166        99
VIS    2025250     91400   19.1600 -108.9400       4.6        77       163       100
VIS    2025250     91400   19.1700 -108.9700       4.7        79       164        98
VIS    2025250     91400   19.1600 -109.0100       4.9        60       171        99
VIS    2025250     91400   19.1800 -109.0400       4.3        78       171       100
VIS    2025250     91400   19.1700 -109.0500       4.5        78       172        99
VIS    2025250     91400   19.1700 -109.0900       4.5        49       180        96
VIS    2025250     91400   19.1100 -111.1200       7.4        74       149        91
VIS    2025250     91400   19.1000 -111.1500       6.8        75       150       100
VIS    2025250     91400   19.0800 -111.4900      11.5       106       123        98
VIS    2025250     91400   19.0700 -111.5300      10.3       110       121        95
VIS    2025250     91400   19.0700 -111.5400       9.7       107       121        90
VIS    2025250     91400   19.0700 -111.6200       7.8       100       142        99
VIS    2025250     91400   19.0800 -111.6400       8.5        99       143        99
VIS    2025250     91400   19.0800 -111.6600       8.2        99       143       100
VIS    2025250     91400   19.0900 -111.7000       8.5        77       143       100
VIS    2025250     91400   19.0700 -111.7300       8.2        70       143        98
VIS    2025250     91400   19.0800 -111.7700       7.7        77       150       100
VIS    2025250     91400   19.0800 -111.7800       7.7        79       157       100
VIS    2025250     91400   19.0700 -111.8300       8.1        92       155       100
VIS    2025250     91400   19.0800 -111.8400       8.3        95       155       100
VIS    2025250     91400   19.0600 -111.8600       8.8        99       149        99
VIS    2025250     91400   19.0800 -111.9100       8.2        98       155       100
VIS    2025250     91400   19.0800 -111.9200       8.2        98       155       100
VIS    2025250     91400   19.0600 -111.9800       8.0        94       158       100
VIS    2025250     91400   19.0800 -112.0000       8.4        94       158       100
VIS    2025250     91400   19.0700 -112.0200       8.5        94       160       100
VIS    2025250     91400   19.0700 -112.0400       8.5        94       160       100
VIS    2025250     91400   19.0600 -112.7400       6.3       134       145        96
VIS    2025250     91400   19.0400 -112.7600       6.5       139       145        99
VIS    2025250     91400   19.0400 -112.7900       6.5       152       147        95
VIS    2025250     91400   19.0400 -112.9300       7.5       134       143        92
VIS    2025250     91400   19.0400 -112.9700       5.9       162       141        95
VIS    2025250     91400   19.0400 -112.9800       5.9       166       139       100
VIS    2025250     91400   19.0300 -113.0100       6.1       156       137        93
VIS    2025250     91400   19.0400 -113.0400       7.5       156       136        96
VIS    2025250     91400   19.0400 -113.0800       8.0       158       135        99
VIS    2025250     91400   19.0300 -113.5200       4.6        10       109        91
VIS    2025250     91400   19.0300 -113.5300       4.9         9       110        91
VIS    2025250     91400   19.0300 -113.5600       4.9         6       110        90
VIS    2025250     91400   19.0000 -114.3600       4.3       161       149        90
VIS    2025250     91400   18.9800 -114.5300       8.8       178       145       100
VIS    2025250     91400   19.0000 -114.5600      10.0       186       146        96
VIS    2025250     91400   18.9900 -114.5900      11.6       186       143        96
VIS    2025250     91400   18.9800 -114.6300      10.3       196       145        99
VIS    2025250     91400   18.9800 -114.6600       9.2       202       147       100
VIS    2025250     91400   18.9900 -114.7000       8.7       197       148        97
VIS    2025250     91400   18.9800 -114.7600      11.5       186       155       100
VIS    2025250     91400   18.9800 -114.7600      11.4       185       155       100
VIS    2025250     91400   18.9800 -115.4000       8.8       146       186        92
VIS    2025250     91400   18.9600 -115.8700       8.1       174       182        99
VIS    2025250     91400   18.9400 -115.9100       7.0       174       179       100
VIS    2025250     91400   18.9400 -115.9300       6.8       175       178       100
VIS    2025250     91400   18.9600 -115.9500       6.7       176       175       100
VIS    2025250     91400   18.9500 -115.9800       5.7       168       171       100
VIS    2025250     91400   18.9500 -116.0000       4.3       171       168        98
VIS    2025250     91400   18.9500 -116.1800       4.0        94       167        96
VIS    2025250     91400   18.8800 -118.4400      10.3        34       179        98
VIS    2025250     91400   18.8900 -118.4600      10.4        32       173       100
VIS    2025250     91400   18.8900 -118.4900       9.6        32       171       100
VIS    2025250     91400   18.9000 -118.5200       6.9        46       183        93
VIS    2025250     91400   18.8800 -118.9500      11.6        32       167        99
VIS    2025250     91400   18.8600 -118.9800      10.2        35       169       100
VIS    2025250     91400   18.8800 -119.0100       9.4        32       173        94
VIS    2025250     91400   18.8800 -119.0100       9.7        28       173        94
VIS    2025250     91400   18.8800 -119.0500      13.7         6       164        98
VIS    2025250     91400   18.8800 -119.0900      13.7         5       161        98
VIS    2025250     91400   18.8600 -119.1000      13.4         6       161       100
VIS    2025250     91400   18.8800 -119.1200      13.3         6       163       100
VIS    2025250     91400   18.8600 -119.1700      12.2       360       166        98
VIS    2025250     91400   18.8600 -119.1800      12.2       354       169        91
VIS    2025250     91400   19.1800 -108.1500       8.9       114       160       100
VIS    2025250     91400   19.1800 -108.1800       8.4       111       161        97
VIS    2025250     91400   19.1800 -108.2300       8.8       109       163        98
VIS    2025250     91400   19.1500 -108.8000       7.5        88       166        92
VIS    2025250     91400   19.1600 -108.8200       7.6        91       166        97
VIS    2025250     91400   19.1500 -108.8400       6.7        83       168        97
VIS    2025250     91400   19.1500 -108.8800       5.3        75       167        99
VIS    2025250     91400   19.1400 -108.9200       4.9        72       168       100
VIS    2025250     91400   19.1400 -108.9500       4.6        71       165        97
VIS    2025250     91400   19.1400 -108.9700       4.5        71       168        93
VIS    2025250     91400   19.1400 -109.0200       4.6        50       172        91
VIS    2025250     91400   19.1400 -109.0400       4.9        69       175        94
VIS    2025250     91400   19.1400 -109.0700       5.3        82       175        94
VIS    2025250     91400   19.0800 -111.0600       8.0        93       158        98
VIS    2025250     91400   19.0800 -111.1000       7.6        83       152        97
VIS    2025250     91400   19.0800 -111.1300       7.1        71       150        97
VIS    2025250     91400   19.0700 -111.1600       7.5        69       150        90
VIS    2025250     91400   19.0600 -111.2300       8.3       130       157        96
VIS    2025250     91400   19.0600 -111.4900      12.1       107       110        96
VIS    2025250     91400   19.0500 -111.5300      10.7       110       107       100
VIS    2025250     91400   19.0600 -111.5500       9.3       109       121        96
VIS    2025250     91400   19.0500 -111.5700       9.3       108       113        99
VIS    2025250     91400   19.0500 -111.6000       6.4       100       112        98
VIS    2025250     91400   19.0500 -111.6600       7.0       111       142        97
VIS    2025250     91400   19.0500 -111.6600       6.9       111       142        97
VIS    2025250     91400   19.0400 -111.6900       6.3       110       143        92
VIS    2025250     91400   19.0600 -111.7400       8.1        72       145        99
VIS    2025250     91400   19.0500 -111.7700       8.0        77       145       100
VIS    2025250     91400   19.0600 -111.7800       7.8        79       149       100
VIS    2025250     91400   19.0600 -111.8100       7.6        85       158        99
VIS    2025250     91400   19.0500 -111.8600       8.7        99       152       100
VIS    2025250     91400   19.0600 -111.8700       8.8        99       152        99
VIS    2025250     91400   19.0600 -111.9000       8.6        98       152        99
VIS    2025250     91400   19.0400 -111.9500       8.1        95       155       100
VIS    2025250     91400   19.0600 -111.9700       7.9        93       158       100
VIS    2025250     91400   19.0500 -111.9900       8.0        93       158       100
VIS    2025250     91400   19.0400 -112.0300       8.2        94       161       100
VIS    2025250     91400   19.0300 -112.1500       6.4       105       168        99
VIS    2025250     91400   19.0500 -112.1800       6.4       107       165       100
VIS    2025250     91400   19.0500 -112.1900       6.5       106       166       100
VIS    2025250     91400   19.0300 -112.7200       6.7       124       143        99
VIS    2025250     91400   19.0300 -112.7500       6.4       138       145        99
VIS    2025250     91400   19.0300 -112.7800       6.3       150       147        97
VIS    2025250     91400   19.0100 -112.8300       9.7       133       146        91
VIS    2025250     91400   19.0100 -112.8600       9.4       136       146        94
VIS    2025250     91400   19.0300 -112.8700       9.7       137       146        93
VIS    2025250     91400   19.0300 -112.9400       7.3       133       143        99
VIS    2025250     91400   19.0100 -113.0600       7.7       160       136        95
VIS    2025250     91400   19.0200 -113.0900       8.1       161       134        93
VIS    2025250     91400   19.0000 -113.5700       5.8         7       111        90
VIS    2025250     91400   18.9700 -114.3900       8.5       160       147        96
VIS    2025250     91400   18.9600 -114.4000       8.6       161       147        97
VIS    2025250     91400   18.9800 -114.4500      10.9       205       148        94
VIS    2025250     91400   18.9600 -114.5300       9.0       181       142       100
VIS    2025250     91400   18.9600 -114.5400       9.3       182       143       100
VIS    2025250     91400   18.9600 -114.5900      11.0       187       143       100
VIS    2025250     91400   18.9600 -114.6000      11.0       188       143       100
VIS    2025250     91400   18.9700 -114.6200      11.3       192       143        99
VIS    2025250     91400   18.9600 -114.6600       9.4       202       148       100
VIS    2025250     91400   18.9500 -114.7300      11.8       186       152       100
VIS    2025250     91400   18.9700 -114.7600      11.0       185       154        99
VIS    2025250     91400   18.9700 -114.7600      11.0       185       155        99
VIS    2025250     91400   18.9500 -114.8000       5.1       171       161        96
VIS    2025250     91400   18.9200 -115.8900       8.1       173       182       100
VIS    2025250     91400   18.9400 -115.9100       7.1       173       180       100
VIS    2025250     91400   18.9400 -115.9400       6.7       175       179       100
VIS    2025250     91400   18.9200 -115.9700       7.1       171       178       100
VIS    2025250     91400   18.9400 -116.0000       4.8       170       170        99
VIS    2025250     91400   18.9400 -116.0000       4.5       173       168        99
VIS    2025250     91400   18.9300 -116.1900       4.0        96       167        99
VIS    2025250     91400   18.9100 -116.2500       4.4       212       169        92
VIS    2025250     91400   18.8500 -118.4700      11.0        31       177        95
VIS    2025250     91400   18.8500 -118.4800      10.8        32       173        95
VIS    2025250     91400   18.8500 -118.9400      11.7        32       165        93
VIS    2025250     91400   18.8500 -118.9800      11.2        35       167        99
VIS    2025250     91400   18.8500 -119.0100      10.5        28       171        90
VIS    2025250     91400   18.8600 -119.0200       9.7        29       170        91
VIS    2025250     91400   18.8600 -119.0700      13.5        10       167       100
VIS    2025250     91400   18.8600 -119.0900      13.4         6       161       100
VIS    2025250     91400   18.8600 -119.1000      13.3         6       161       100
VIS    2025250     91400   18.8600 -119.1400      13.0         6       166        99
VIS    2025250     91400   18.8600 -119.1700      12.4         3       166        99
VIS    2025250     91400   18.8500 -119.1800      12.3       354       169        90
VIS    2025250     91400   19.1600 -108.1600       8.1       115       159        99
VIS    2025250     91400   19.1400 -108.2100       8.1       113       160        97
VIS    2025250     91400   19.1300 -108.7100       8.3        67       176       100
VIS    2025250     91400   19.1100 -108.8000       5.9        66       167       100
VIS    2025250     91400   19.1300 -108.8300       6.3        80       168       100
VIS    2025250     91400   19.1100 -108.8500       6.3        74       171       100
VIS    2025250     91400   19.1100 -108.8900       5.8        75       171        97
VIS    2025250     91400   19.1100 -108.9100       5.7        74       171        97
VIS    2025250     91400   19.1200 -108.9400       4.8        72       170        95
VIS    2025250     91400   19.1300 -108.9700       4.7        71       170        91
VIS    2025250     91400   19.1300 -109.0400       4.3        49       175        95
VIS    2025250     91400   19.0600 -111.1000       7.8        86       153        97
VIS    2025250     91400   19.0400 -111.1500       8.4        56       153        99
VIS    2025250     91400   19.0500 -111.1600       8.3        61       153        97
VIS    2025250     91400   19.0300 -111.1900       8.9        47       154        96
VIS    2025250     91400   19.0300 -111.4200      14.1        97       112        97
VIS    2025250     91400   19.0400 -111.4300      12.8       105       116        91
VIS    2025250     91400   19.0200 -111.5600       7.4        92       107        92
VIS    2025250     91400   19.0400 -111.5700       8.4       103       108       100
VIS    2025250     91400   19.0200 -111.6100       6.2       100       105        99
VIS    2025250     91400   19.0400 -111.6500       6.1       114       137        98
VIS    2025250     91400   19.0400 -111.6900       6.2       113       143        90
VIS    2025250     91400   19.0400 -111.7500       8.1        78       145        99
VIS    2025250     91400   19.0300 -111.7500       8.2        80       145       100
VIS    2025250     91400   19.0200 -111.7900       7.9        84       147        98
VIS    2025250     91400   19.0300 -111.8100       7.4        86       157        96
VIS    2025250     91400   19.0200 -111.8700       8.5        97       152       100
VIS    2025250     91400   19.0100 -111.8800       8.5        97       152       100
VIS    2025250     91400   19.0100 -111.9200       8.1        96       152        99
VIS    2025250     91400   19.0100 -111.9400       8.0        96       152        99
VIS    2025250     91400   19.0300 -111.9700       8.0        93       158       100
VIS    2025250     91400   19.0100 -112.0200       8.3        94       162       100
VIS    2025250     91400   19.0100 -112.0300       8.3        94       162       100
VIS    2025250     91400   19.0100 -112.1300       7.7        97       162        99
VIS    2025250     91400   19.0200 -112.1600       6.5       103       167        99
VIS    2025250     91400   19.0100 -112.1700       6.6        99       164        99
VIS    2025250     91400   18.9900 -112.7000       7.3        62       150        93
VIS    2025250     91400   19.0000 -112.7500       5.4       138       148       100
VIS    2025250     91400   19.0100 -112.7700       6.0       143       149        99
VIS    2025250     91400   18.9900 -112.7900       6.3       151       150        96
VIS    2025250     91400   18.9900 -112.8700       7.9       136       147        99
VIS    2025250     91400   18.9900 -112.8900       7.2       141       146        92
VIS    2025250     91400   18.9900 -112.9200       4.2       144       147        90
VIS    2025250     91400   19.0000 -113.0500       7.4       157       137        91
VIS    2025250     91400   19.0000 -113.1000       7.7       164       135        90
VIS    2025250     91400   18.9800 -113.2300       4.3        91       127        97
VIS    2025250     91400   18.9700 -113.4100       4.9        38       116        92
VIS    2025250     91400   18.9500 -114.3700       8.7       164       147        92
VIS    2025250     91400   18.9600 -114.3900       8.8       162       147        99
VIS    2025250     91400   18.9500 -114.4100       8.8       167       148       100
VIS    2025250     91400   18.9500 -114.4500       9.5       182       148        90
VIS    2025250     91400   18.9400 -114.4700      10.5       181       146        97
VIS    2025250     91400   18.9300 -114.4900      10.3       177       146        95
VIS    2025250     91400   18.9400 -114.5300       9.6       180       142       100
VIS    2025250     91400   18.9400 -114.5400       9.5       183       142       100
VIS    2025250     91400   18.9500 -114.5900      10.5       189       143       100
VIS    2025250     91400   18.9500 -114.6000      10.8       189       143       100
VIS    2025250     91400   18.9300 -114.6500       9.3       199       150        95
VIS    2025250     91400   18.9400 -114.8000       5.6       171       161        92
VIS    2025250     91400   18.9200 -115.6200       4.3       148       175        96
VIS    2025250     91400   18.9100 -115.6600       5.3       137       178        99
VIS    2025250     91400   18.9100 -115.8700       9.3       178       182        95
VIS    2025250     91400   18.8900 -115.9100       8.0       169       181       100
VIS    2025250     91400   18.9100 -115.9400       7.6       173       179       100
VIS    2025250     91400   18.9000 -115.9600       7.4       172       178       100
VIS    2025250     91400   18.9100 -115.9800       7.2       171       177        99
VIS    2025250     91400   18.9000 -116.0300       6.5       202       169        99
VIS    2025250     91400   18.9000 -116.2600       5.7       223       169        93
VIS    2025250     91400   18.8600 -117.4500       4.5       311       180        98
VIS    2025250     91400   18.8500 -117.9200       9.5       145       184        94
VIS    2025250     91400   18.8600 -117.9400      10.5       146       185        95
VIS    2025250     91400   18.8600 -117.9600      11.2       145       187        95
VIS    2025250     91400   18.8300 -118.3800      11.7       129       172        90
VIS    2025250     91400   18.8500 -118.4800      10.8        33       177        98
VIS    2025250     91400   18.8500 -118.4800      10.7        34       177        95
VIS    2025250     91400   18.8400 -118.5300       8.0        27       177       100
VIS    2025250     91400   18.8300 -119.0400      12.6        25       170        99
VIS    2025250     91400   18.8300 -119.0800      13.2         9       168        97
VIS    2025250     91400   18.8200 -119.1100      12.6         7       164        99
VIS    2025250     91400   19.1100 -108.6400       5.1        73       172        96
VIS    2025250     91400   19.1100 -108.8500       6.3        72       172       100
VIS    2025250     91400   19.1000 -108.9000       5.6        67       172        93
VIS    2025250     91400   19.0800 -109.1100       4.7        83       180        97
VIS    2025250     91400   19.0300 -111.1400       8.1        61       153        97
VIS    2025250     91400   19.0300 -111.1700       9.0        49       154        96
VIS    2025250     91400   19.0200 -111.2000       9.2        42       156        95
VIS    2025250     91400   19.0300 -111.3300       9.6        47       155        99
VIS    2025250     91400   19.0100 -111.3800       9.9        91       141        99
VIS    2025250     91400   19.0200 -111.4200      13.2        98       116       100
VIS    2025250     91400   19.0100 -111.4400      13.9       102       104        99
VIS    2025250     91400   19.0000 -111.5000      15.2        84       103        92
VIS    2025250     91400   19.0000 -111.6000       6.6        93       104        95
VIS    2025250     91400   19.0000 -111.6200       6.4        98       105        98
VIS    2025250     91400   19.0100 -111.6400       5.8       113       117       100
VIS    2025250     91400   19.0000 -111.7400       8.4        92       145        98
VIS    2025250     91400   19.0000 -111.7700       8.8        88       144        99
VIS    2025250     91400   19.0000 -111.7900       8.2        87       145        99
VIS    2025250     91400   18.9900 -111.8500       7.8        93       157       100
VIS    2025250     91400   19.0100 -111.8700       8.3        96       152       100
VIS    2025250     91400   19.0100 -111.8800       8.4        97       152       100
VIS    2025250     91400   19.0000 -111.9300       7.9        94       152        99
VIS    2025250     91400   19.0000 -111.9400       7.7        94       152        98
VIS    2025250     91400   18.9800 -111.9800       7.1        93       161        97
VIS    2025250     91400   19.0000 -112.0200       8.2        93       162       100
VIS    2025250     91400   19.0000 -112.0400       7.8        94       162        98
VIS    2025250     91400   18.9800 -112.1100       7.8       103       160       100
VIS    2025250     91400   19.0000 -112.1300       7.8        96       161        99
VIS    2025250     91400   19.0000 -112.1600       7.4        94       165       100
VIS    2025250     91400   18.9900 -112.1900       6.7        96       168       100
VIS    2025250     91400   18.9900 -112.2100       6.1        96       168       100
VIS    2025250     91400   18.9700 -112.7800       6.8       142       151        97
VIS    2025250     91400   18.9800 -112.7900       6.8       145       151        99
VIS    2025250     91400   18.9800 -112.8200       8.5       130       150        94
VIS    2025250     91400   18.9700 -112.8700       6.6       131       148        99
VIS    2025250     91400   18.9600 -112.8800       6.1       137       148        96
VIS    2025250     91400   18.9800 -112.9200       4.5       142       146        97
VIS    2025250     91400   18.9600 -113.0000       4.4       127       141        90
VIS    2025250     91400   18.9700 -113.0300       4.4       140       138        90
VIS    2025250     91400   18.9700 -113.2200       4.2        94       127        95
VIS    2025250     91400   18.9500 -113.2500       5.3       102       127        99
VIS    2025250     91400   18.9600 -113.2600       5.1        96       127        94
VIS    2025250     91400   18.9200 -114.4300       9.2       172       148        94
VIS    2025250     91400   18.9100 -114.4400       9.7       174       146        99
VIS    2025250     91400   18.9100 -114.4700      10.4       181       145       100
VIS    2025250     91400   18.9200 -114.4900      10.4       178       146        98
VIS    2025250     91400   18.9100 -114.5300       9.3       177       147       100
VIS    2025250     91400   18.9200 -114.5700       9.2       189       141       100
VIS    2025250     91400   18.9200 -114.5800       9.3       191       143       100
VIS    2025250     91400   18.9100 -114.6100       9.3       198       150       100
VIS    2025250     91400   18.9300 -114.6300       9.2       200       150        99
VIS    2025250     91400   18.9000 -114.6800      10.1       198       150       100
VIS    2025250     91400   18.9000 -114.7000      10.8       195       150       100
VIS    2025250     91400   18.9000 -114.8800       7.3       203       176        98
VIS    2025250     91400   18.8900 -115.1800       9.3       171       185       100
VIS    2025250     91400   18.9000 -115.6100       4.4       156       175        92
VIS    2025250     91400   18.8900 -115.6400       4.7       153       180        96
VIS    2025250     91400   18.8900 -115.6500       4.8       150       180        98
VIS    2025250     91400   18.8900 -115.9100       7.9       169       181       100
VIS    2025250     91400   18.8800 -115.9500       7.8       169       178        99
VIS    2025250     91400   18.8700 -115.9700       7.3       165       175        97
VIS    2025250     91400   18.8800 -115.9900       6.7       171       174        95
VIS    2025250     91400   18.8800 -116.0200       7.5       205       167       100
VIS    2025250     91400   18.8600 -116.6300       9.0       333       169        91
VIS    2025250     91400   18.8500 -116.6600       6.2       313       166       100
VIS    2025250     91400   18.8400 -117.9700       9.7       145       185       100
VIS    2025250     91400   18.8300 -118.0000      10.6       138       186        98
VIS    2025250     91400   18.8100 -118.0400       5.5       118       186        98
VIS    2025250     91400   18.8200 -118.2300      13.6       158       186        95
VIS    2025250     91400   18.8100 -118.2400      13.3       158       186        97
VIS    2025250     91400   18.8100 -118.3200      10.0       113       172        91
VIS    2025250     91400   18.8100 -118.3300      10.1       110       171        99
VIS    2025250     91400   18.8100 -118.3600      10.6       118       170        97
VIS    2025250     91400   18.8100 -118.3800      11.4       127       172        93
VIS    2025250     91400   18.8100 -119.0800      13.2         7       168        90
VIS    2025250     91400   19.0700 -108.6100       7.0        66       186        98
VIS    2025250     91400   19.0700 -108.6500       8.6        63       171        93
VIS    2025250     91400   19.0600 -108.8000       6.7        83       177        98
VIS    2025250     91400   19.0600 -109.0300       4.0        87       180       100
VIS    2025250     91400   19.0500 -109.0900       5.8        57       180        95
VIS    2025250     91400   19.0700 -109.1100       4.5        81       181        98
VIS    2025250     91400   19.0500 -109.1600       4.8        51       184        99
VIS    2025250     91400   19.0600 -109.1700       5.2        41       187        91
VIS    2025250     91400   19.0200 -109.9800       5.0        53       167        96
VIS    2025250     91400   18.9800 -111.1900       8.6        45       158        95
VIS    2025250     91400   18.9900 -111.3200       9.6        43       158        99
VIS    2025250     91400   18.9800 -111.3400       9.5        44       158        99
VIS    2025250     91400   18.9800 -111.3800      13.2       107       136        92
VIS    2025250     91400   18.9900 -111.3800      12.7       107       136        95
VIS    2025250     91400   19.0000 -111.4100      13.3       102       124        99
VIS    2025250     91400   18.9800 -111.6100       6.7        94       105        94
VIS    2025250     91400   18.9800 -111.6300       6.4        99       110        95
VIS    2025250     91400   18.9700 -111.6500       6.0       107       123        94
VIS    2025250     91400   18.9800 -111.7300       7.7        99       145        97
VIS    2025250     91400   18.9800 -111.7600       9.0        87       147        99
VIS    2025250     91400   18.9900 -111.7700       8.7        87       144        99
VIS    2025250     91400   18.9700 -111.8000       7.9        87       150        99
VIS    2025250     91400   18.9800 -111.8500       7.8        93       156       100
VIS    2025250     91400   18.9700 -111.8600       7.8        93       155       100
VIS    2025250     91400   18.9700 -111.8900       7.8        93       152       100
VIS    2025250     91400   18.9800 -111.9200       7.8        92       152       100
VIS    2025250     91400   18.9700 -111.9500       7.4        89       154        97
VIS    2025250     91400   18.9600 -111.9900       6.5        89       160        96
VIS    2025250     91400   18.9800 -112.0100       7.3        94       162        97
VIS    2025250     91400   18.9600 -112.0400       7.5        96       162        98
VIS    2025250     91400   18.9600 -112.0900       8.7       109       163       100
VIS    2025250     91400   18.9700 -112.0900       8.4       109       163       100
VIS    2025250     91400   18.9600 -112.1300       7.8        95       156        99
VIS    2025250     91400   18.9600 -112.1500       7.9        89       158        95
VIS    2025250     91400   18.9700 -112.1900       7.3        91       164        99
VIS    2025250     91400   18.9500 -112.7800       6.3       140       151        99
VIS    2025250     91400   18.9500 -112.8000       7.2       143       151       100
VIS    2025250     91400   18.9300 -112.8400       6.6       136       150       100
VIS    2025250     91400   18.9400 -112.8700       6.2       132       148        97
VIS    2025250     91400   18.9500 -112.8900       6.0       141       148        96
VIS    2025250     91400   18.9400 -112.9400       5.4       142       144        90
VIS    2025250     91400   18.9300 -112.9800       5.0       132       143        93
VIS    2025250     91400   18.9400 -113.0300       4.5       141       140        94
VIS    2025250     91400   18.9300 -113.0600       5.8       170       137       100
VIS    2025250     91400   18.9300 -113.0900       6.4       169       137        98
VIS    2025250     91400   18.9300 -113.1400       6.7       129       135        94
VIS    2025250     91400   18.9300 -113.3600       5.6        69       117        99
VIS    2025250     91400   18.9300 -113.3800       5.4        61       117        96
VIS    2025250     91400   18.9200 -113.5300       4.6       352       120        91
VIS    2025250     91400   18.9000 -114.2200      10.6       267       149        92
VIS    2025250     91400   18.8900 -114.2700       9.0       189       151        94
VIS    2025250     91400   18.8900 -114.4100       9.8       171       147        98
VIS    2025250     91400   18.8900 -114.4300       9.7       172       144        98
VIS    2025250     91400   18.9000 -114.4400       9.6       172       144        97
VIS    2025250     91400   18.8900 -114.4700      10.3       182       145        99
VIS    2025250     91400   18.9000 -114.5000      10.5       182       146        99
VIS    2025250     91400   18.8800 -114.5400       8.8       178       147       100
VIS    2025250     91400   18.9000 -114.5700       9.0       185       143       100
VIS    2025250     91400   18.8900 -114.6000       9.1       194       151        99
VIS    2025250     91400   18.9000 -114.6100       9.2       197       151       100
VIS    2025250     91400   18.8800 -114.6600       9.6       198       152       100
VIS    2025250     91400   18.8900 -114.6800      10.2       198       151        99
VIS    2025250     91400   18.8900 -114.6900      10.9       196       151       100
VIS    2025250     91400   18.8800 -114.7300       7.5       181       154        90
VIS    2025250     91400   18.8800 -114.7800       4.1       173       158       100
VIS    2025250     91400   18.8900 -114.8900       8.2       198       176       100
VIS    2025250     91400   18.8700 -115.1700       8.3       173       181        96
VIS    2025250     91400   18.8800 -115.1800       9.4       171       183        99
VIS    2025250     91400   18.8500 -115.8400      10.8       178       186        90
VIS    2025250     91400   18.8600 -115.8700       5.3       177       186        96
VIS    2025250     91400   18.8600 -115.8800       5.4       175       183        97
VIS    2025250     91400   18.8600 -115.9300       7.4       168       180       100
VIS    2025250     91400   18.8500 -115.9500       6.8       165       176       100
VIS    2025250     91400   18.8400 -115.9700       5.8       159       174        99
VIS    2025250     91400   18.8400 -116.0000       4.6       151       170        98
VIS    2025250     91400   18.8500 -116.0700       4.6       169       174        95
VIS    2025250     91400   18.8500 -116.0700       4.9       173       174       100
VIS    2025250     91400   18.8400 -116.1700       7.3       203       173        93
VIS    2025250     91400   18.8000 -117.4700       4.5       354       180        98
VIS    2025250     91400   18.8100 -117.4800       5.3       355       185        97
VIS    2025250     91400   18.8000 -117.9500       7.0       141       185        90
VIS    2025250     91400   18.7900 -118.0500       5.0       122       186       100
VIS    2025250     91400   18.7900 -118.0600       4.7       122       186       100
VIS    2025250     91400   18.8000 -118.2700      13.8       157       187        94
VIS    2025250     91400   18.8000 -118.3200      10.2       109       171        96
VIS    2025250     91400   18.7900 -118.3300      10.0       105       171        98
VIS    2025250     91400   18.7700 -118.6200      10.7        28       165       100
VIS    2025250     91400   18.7700 -119.0200      11.5        39       172        91
VIS    2025250     91400   19.0600 -108.6000       6.6        64       184        93
VIS    2025250     91400   19.0500 -108.6400       8.1        65       173        97
VIS    2025250     91400   19.0400 -108.6500       7.3        70       171        99
VIS    2025250     91400   19.0600 -108.6700       6.9        68       171        90
VIS    2025250     91400   19.0400 -108.7200       5.7       110       172        90
VIS    2025250     91400   19.0500 -108.7600       7.1        89       172        94
VIS    2025250     91400   19.0400 -108.7700       8.2        89       172        99
VIS    2025250     91400   19.0300 -109.0800       5.2        55       181        99
VIS    2025250     91400   19.0300 -109.1200       6.3        50       183        99
VIS    2025250     91400   19.0200 -109.9400       5.9        34       166       100
VIS    2025250     91400   19.0100 -109.9900       5.0        61       167        99
VIS    2025250     91400   19.0100 -110.0000       5.0        67       167        97
VIS    2025250     91400   18.9600 -111.1900       7.9        51       161        98
VIS    2025250     91400   18.9500 -111.4100      14.3       111       125        98
VIS    2025250     91400   18.9600 -111.4400      13.2       114       124        98
VIS    2025250     91400   18.9500 -111.6300       6.3        99       119        91
VIS    2025250     91400   18.9600 -111.6700       6.1       117       142        94
VIS    2025250     91400   18.9600 -111.6900       6.7       124       145        92
VIS    2025250     91400   18.9500 -111.7400       9.8        92       146        99
VIS    2025250     91400   18.9600 -111.7600       9.1        88       147       100
VIS    2025250     91400   18.9600 -111.7800       8.6        87       147       100
VIS    2025250     91400   18.9400 -111.8100       7.7        86       149        99
VIS    2025250     91400   18.9400 -111.8500       7.7        90       151        99
VIS    2025250     91400   18.9500 -111.8600       7.7        91       152       100
VIS    2025250     91400   18.9400 -111.8900       7.6        92       152       100
VIS    2025250     91400   18.9500 -111.9200       7.6        92       154       100
VIS    2025250     91400   18.9400 -111.9700       7.1        89       157        98
VIS    2025250     91400   18.9400 -111.9900       6.5        88       158        96
VIS    2025250     91400   18.9300 -112.0400       6.6        90       162        97
VIS    2025250     91400   18.9400 -112.0400       7.1        93       162        99
VIS    2025250     91400   18.9500 -112.0700       8.6       102       163       100
VIS    2025250     91400   18.9500 -112.1100       8.5       103       159       100
VIS    2025250     91400   18.9400 -112.1400       7.7        93       156       100
VIS    2025250     91400   18.9300 -112.1600       7.3        90       156        97
VIS    2025250     91400   18.9300 -112.2100       5.0        96       166        99
VIS    2025250     91400   18.9300 -112.2200       5.0        98       166       100
VIS    2025250     91400   18.9100 -112.7900       5.8       142       148        97
VIS    2025250     91400   18.9100 -112.8300       6.3       143       151       100
VIS    2025250     91400   18.9100 -112.8300       6.2       142       151       100
VIS    2025250     91400   18.9200 -112.8600       6.1       141       149        98
VIS    2025250     91400   18.9200 -112.9100       5.2       154       147        99
VIS    2025250     91400   18.9200 -112.9200       5.5       158       146       100
VIS    2025250     91400   18.9000 -112.9800       6.2       129       143        90
VIS    2025250     91400   18.9000 -113.1500       7.6       128       135        95
VIS    2025250     91400   18.8900 -113.7500       9.2       292       121        95
VIS    2025250     91400   18.8700 -114.0500       7.8       184       132       100
VIS    2025250     91400   18.8700 -114.0900      10.6       197       138       100
VIS    2025250     91400   18.8700 -114.2700       8.6       191       151        93
VIS    2025250     91400   18.8900 -114.2700       8.8       188       151        94
VIS    2025250     91400   18.8600 -114.3500      10.8       173       152        92
VIS    2025250     91400   18.8700 -114.3800      10.6       177       152       100
VIS    2025250     91400   18.8800 -114.4100       9.6       171       147        99
VIS    2025250     91400   18.8800 -114.4300       9.6       172       144        99
VIS    2025250     91400   18.8700 -114.4500       9.2       173       144        99
VIS    2025250     91400   18.8800 -114.4800      10.1       181       144        98
VIS    2025250     91400   18.8600 -114.5100       9.5       180       147       100
VIS    2025250     91400   18.8700 -114.5400       9.0       180       146        99
VIS    2025250     91400   18.8700 -114.5700       8.3       183       147        99
VIS    2025250     91400   18.8800 -114.5800       8.5       186       150        99
VIS    2025250     91400   18.8600 -114.6200       8.2       192       152        99
VIS    2025250     91400   18.8700 -114.6500       9.2       196       152       100
VIS    2025250     91400   18.8600 -114.6900       8.9       197       154       100
VIS    2025250     91400   18.8600 -114.7100       8.3       191       154       100
VIS    2025250     91400   18.8700 -114.7300       7.3       183       154        95
VIS    2025250     91400   18.8600 -114.7800       4.0       168       161        92
VIS    2025250     91400   18.8500 -114.7900       5.0       169       163       100
VIS    2025250     91400   18.8700 -114.8600       9.5       188       176        91
VIS    2025250     91400   18.8600 -114.8700       7.9       186       180        99
VIS    2025250     91400   18.8700 -114.9100       8.3       193       176        97
VIS    2025250     91400   18.8500 -115.2000       8.2       173       182        95
VIS    2025250     91400   18.8200 -115.7700       4.7       138       179        94
VIS    2025250     91400   18.8400 -115.9000       5.5       174       183       100
VIS    2025250     91400   18.8300 -115.9100       5.1       173       183       100
VIS    2025250     91400   18.8200 -115.9600       4.3       168       174        92
VIS    2025250     91400   18.8300 -115.9800       4.9       157       173        94
VIS    2025250     91400   18.8300 -116.0000       4.7       149       173        91
VIS    2025250     91400   18.8100 -116.0900       6.1       163       179        99
VIS    2025250     91400   18.8100 -116.1500       7.4       200       174        96
VIS    2025250     91400   18.8200 -116.1700       6.5       199       173        92
VIS    2025250     91400   18.8300 -116.2100       6.4       200       172        95
VIS    2025250     91400   18.8100 -116.2400       6.9       202       171        94
VIS    2025250     91400   18.8200 -116.2500       7.3       203       171        98
VIS    2025250     91400   18.7900 -117.4800       5.4       353       183       100
VIS    2025250     91400   18.7700 -117.9400       7.4       141       185        96
VIS    2025250     91400   18.7700 -118.0500       4.7       125       188        93
VIS    2025250     91400   18.7800 -118.0600       4.7       121       186       100
VIS    2025250     91400   18.7700 -118.2600       7.5       133       186        99
VIS    2025250     91400   18.7700 -118.3300       9.3        93       172        94
VIS    2025250     91400   18.7600 -118.5900      10.5        24       167        97
VIS    2025250     91400   18.7500 -118.6100      10.5        21       166        96
VIS    2025250     91400   18.7400 -118.9300      13.1        12       177        97
VIS    2025250     91400   18.7500 -118.9600      12.2        35       169        90
VIS    2025250     91400   18.7500 -119.0000      12.1        44       170        95
VIS    2025250     91400   18.7300 -119.2200      11.4         9       175        95
VIS    2025250     91400   19.0200 -108.5800       5.2        58       183        98
VIS    2025250     91400   19.0400 -108.6000       6.7        64       182        94
VIS    2025250     91400   19.0400 -108.6400       7.7        67       173       100
VIS    2025250     91400   19.0300 -108.6500       7.5        68       171       100
VIS    2025250     91400   19.0200 -108.6900       7.1        83       169        99
VIS    2025250     91400   19.0200 -108.7500       7.3        87       174        97
VIS    2025250     91400   19.0100 -108.8000       8.4        88       169       100
VIS    2025250     91400   19.0100 -108.8300       7.9        88       168       100
VIS    2025250     91400   19.0100 -108.8700       5.9        80       169        97
VIS    2025250     91400   19.0200 -108.9200       5.2        74       177        93
VIS    2025250     91400   19.0200 -108.9300       5.2        75       177        95
VIS    2025250     91400   19.0200 -109.0400       4.0        74       183        96
VIS    2025250     91400   19.0200 -109.0900       5.4        50       182        99
VIS    2025250     91400   18.9800 -109.9500       6.6        37       168        91
VIS    2025250     91400   18.9400 -111.2000       8.0        51       161        95
VIS    2025250     91400   18.9400 -111.4100      14.0       110       125        95
VIS    2025250     91400   18.9200 -111.5000      10.5       114       122       100
VIS    2025250     91400   18.9400 -111.6300       6.5       108       126        99
VIS    2025250     91400   18.9300 -111.7100      12.9        96       146       100
VIS    2025250     91400   18.9300 -111.7200      12.5        97       146        99
VIS    2025250     91400   18.9200 -111.7700       9.8        92       146       100
VIS    2025250     91400   18.9100 -111.8000       7.9        89       147        99
VIS    2025250     91400   18.9200 -111.8100       7.8        89       147        99
VIS    2025250     91400   18.9200 -111.8600       7.7        90       150       100
VIS    2025250     91400   18.9200 -111.8900       7.3        91       151       100
VIS    2025250     91400   18.9200 -111.9000       7.2        90       151       100
VIS    2025250     91400   18.9100 -111.9500       7.4        87       150       100
VIS    2025250     91400   18.9100 -111.9600       7.5        87       150       100
VIS    2025250     91400   18.9200 -111.9900       6.5        88       152        98
VIS    2025250     91400   18.9200 -112.0300       5.5        81       161        92
VIS    2025250     91400   18.9100 -112.0700       7.7        90       160       100
VIS    2025250     91400   18.9200 -112.0800       8.3        93       160       100
VIS    2025250     91400   18.9200 -112.1100       8.6        96       159        99
VIS    2025250     91400   18.9200 -112.1400       7.9        93       156        99
VIS    2025250     91400   18.9200 -112.1700       7.0        89       156        97
VIS    2025250     91400   18.9100 -112.2200       4.9        96       165       100
VIS    2025250     91400   18.9100 -112.2200       4.8        99       166       100
VIS    2025250     91400   18.8800 -112.8000       5.6       133       149        94
VIS    2025250     91400   18.9000 -112.8300       6.0       142       151       100
VIS    2025250     91400   18.9000 -112.8300       6.0       143       151       100
VIS    2025250     91400   18.9000 -112.9700       6.3       129       144        90
VIS    2025250     91400   18.9000 -112.9800       6.4       129       144        90
VIS    2025250     91400   18.8700 -113.1500       8.4       118       138        91
VIS    2025250     91400   18.8800 -113.3200       4.1        63       123        98
VIS    2025250     91400   18.8700 -113.9000       9.5       169       122       100
VIS    2025250     91400   18.8600 -113.9200       8.3       168       123        93
VIS    2025250     91400   18.8500 -114.0400       6.9       182       130        98
VIS    2025250     91400   18.8500 -114.0700       8.7       191       136        99
VIS    2025250     91400   18.8600 -114.1000       9.5       204       139       100
VIS    2025250     91400   18.8400 -114.1200       9.5       205       139        99
VIS    2025250     91400   18.8500 -114.1400       8.1       205       139        96
VIS    2025250     91400   18.8400 -114.1800       7.9       198       140       100
VIS    2025250     91400   18.8400 -114.1900       8.0       198       141       100
VIS    2025250     91400   18.8400 -114.2400       8.8       199       148        99
VIS    2025250     91400   18.8400 -114.2500       8.8       198       151        99
VIS    2025250     91400   18.8600 -114.2900       8.6       181       151        94
VIS    2025250     91400   18.8400 -114.3100       8.1       174       151       100
VIS    2025250     91400   18.8400 -114.3400      10.1       175       151       100
VIS    2025250     91400   18.8500 -114.3800      10.5       176       152       100
VIS    2025250     91400   18.8400 -114.4000       9.1       176       152        99
VIS    2025250     91400   18.8400 -114.4400       8.3       174       150        99
VIS    2025250     91400   18.8400 -114.4600       8.4       174       149        99
VIS    2025250     91400   18.8500 -114.4900       9.2       178       148        98
VIS    2025250     91400   18.8500 -114.5100       9.4       179       150        99
VIS    2025250     91400   18.8500 -114.5600       8.8       182       151        99
VIS    2025250     91400   18.8500 -114.5600       8.6       183       151        99
VIS    2025250     91400   18.8400 -114.5900       7.7       189       152        93
VIS    2025250     91400   18.8500 -114.6200       8.0       192       152        99
VIS    2025250     91400   18.8300 -114.6600       7.7       196       155       100
VIS    2025250     91400   18.8400 -114.7000       8.4       198       155       100
VIS    2025250     91400   18.8300 -114.7300       7.3       194       154        99
VIS    2025250     91400   18.8500 -114.7500       5.6       181       155       100
VIS    2025250     91400   18.8400 -114.7600       5.0       175       158       100
VIS    2025250     91400   18.8400 -114.8600       7.1       181       181        93
VIS    2025250     91400   18.8400 -114.8700       7.1       181       181        95
VIS    2025250     91400   18.8300 -115.1900       7.4       175       183        92
VIS    2025250     91400   18.8000 -115.6500       4.0       166       184        99
VIS    2025250     91400   18.8100 -115.8700       6.7       174       185        91
VIS    2025250     91400   18.7900 -115.9000       6.0       169       183        98
VIS    2025250     91400   18.8000 -115.9200       5.6       169       183        98
VIS    2025250     91400   18.8100 -116.0800       6.0       162       178        95
VIS    2025250     91400   18.8000 -116.0800       5.6       164       179        94
VIS    2025250     91400   18.7900 -116.1900       5.8       206       172        98
VIS    2025250     91400   18.8000 -116.2100       6.0       198       171        96
VIS    2025250     91400   18.8100 -116.2500       7.6       206       171        99
VIS    2025250     91400   18.7900 -116.2900       7.7       213       171        94
VIS    2025250     91400   18.7900 -116.6400       4.3       325       158        96
VIS    2025250     91400   18.7600 -117.4500       5.7         2       179       100
VIS    2025250     91400   18.7700 -117.4800       6.3       354       188       100
VIS    2025250     91400   18.7700 -117.4900       6.4       354       188        99
VIS    2025250     91400   18.7600 -117.9300       7.6       141       186        90
VIS    2025250     91400   18.7300 -118.2300       4.2        63       186        97
VIS    2025250     91400   18.7500 -118.3500       7.4        73       170        98
VIS    2025250     91400   18.7400 -118.3800       6.7        58       166       100
VIS    2025250     91400   18.7100 -119.2200      11.3         6       177        92
VIS    2025250     91400   18.7300 -119.2300      11.5         9       176        94
VIS    2025250     91400   18.7100 -119.2700      13.8         6       174        95
VIS    2025250     91400   19.0100 -108.5900       4.9        60       183       100
VIS    2025250     91400   19.0100 -108.6200       5.1        65       179       100
VIS    2025250     91400   19.0000 -108.6300       5.3        71       179        98
VIS    2025250     91400   19.0100 -108.6500       6.6        71       171       100
VIS    2025250     91400   19.0000 -108.7000       7.6        86       171       100
VIS    2025250     91400   18.9900 -108.7300       7.3       106       177       100
VIS    2025250     91400   18.9900 -108.7500       6.1       108       179        97
VIS    2025250     91400   19.0100 -108.8000       8.3        88       167       100
VIS    2025250     91400   19.0000 -108.8100       8.2        88       168       100
VIS    2025250     91400   18.9900 -108.8500       7.2        85       167        99
VIS    2025250     91400   18.9800 -109.1100       6.3        23       190        95
VIS    2025250     91400   18.9500 -110.2100       8.4       110       160        97
VIS    2025250     91400   18.9400 -110.3700      13.2        95       141       100
VIS    2025250     91400   18.9100 -111.1500       8.0        38       164        93
VIS    2025250     91400   18.9100 -111.1700       8.2        35       164        93
VIS    2025250     91400   18.9300 -111.2100       8.6        59       161        92
VIS    2025250     91400   18.9100 -111.3000      10.3       110       136        96
VIS    2025250     91400   18.9100 -111.3100      10.3       110       136        95
VIS    2025250     91400   18.9100 -111.3800      14.0       110       126        99
VIS    2025250     91400   18.9200 -111.4000      13.4       113       124        99
VIS    2025250     91400   18.9200 -111.5000      10.0       115       121       100
VIS    2025250     91400   18.9100 -111.7100      13.3        99       145       100
VIS    2025250     91400   18.8900 -111.7500      11.9        94       144       100
VIS    2025250     91400   18.8900 -111.7800       9.8        91       144       100
VIS    2025250     91400   18.9000 -111.7900       8.4        89       145       100
VIS    2025250     91400   18.9100 -111.8200       7.6        88       147        98
VIS    2025250     91400   18.9100 -111.8500       7.6        90       149        98
VIS    2025250     91400   18.9100 -111.8800       7.3        90       150       100
VIS    2025250     91400   18.9000 -111.9100       7.0        88       151       100
VIS    2025250     91400   18.9100 -111.9500       7.4        86       150       100
VIS    2025250     91400   18.8800 -111.9600       7.3        86       151       100
VIS    2025250     91400   18.8900 -111.9900       6.3        88       152        97
VIS    2025250     91400   18.8800 -112.0800       7.5        88       161       100
VIS    2025250     91400   18.8800 -112.0800       7.7        89       161       100
VIS    2025250     91400   18.8800 -112.1200       8.2        94       158       100
VIS    2025250     91400   18.8900 -112.1400       7.8        90       153       100
VIS    2025250     91400   18.8800 -112.1700       7.2        78       157       100
VIS    2025250     91400   18.8800 -112.2200       4.9        96       162       100
VIS    2025250     91400   18.8800 -112.2500       5.1       106       163       100
VIS    2025250     91400   18.8900 -112.2600       5.3       110       164        99
VIS    2025250     91400   18.8800 -112.8000       5.5       131       149        95
VIS    2025250     91400   18.8800 -112.8300       5.2       137       153        97
VIS    2025250     91400   18.8600 -112.8400       5.0       145       154        98
VIS    2025250     91400   18.8700 -112.8700       5.1       138       154       100
VIS    2025250     91400   18.8600 -112.9500       6.1       128       147        93
VIS    2025250     91400   18.8700 -112.9700       6.5       131       145        95
VIS    2025250     91400   18.8500 -113.1300       6.1       120       144        93
VIS    2025250     91400   18.8700 -113.1700       6.9       118       138        96
VIS    2025250     91400   18.8500 -113.3900       5.4        54       124        90
VIS    2025250     91400   18.8200 -113.9900       4.4       166       126        99
VIS    2025250     91400   18.8300 -114.0200       5.0       168       126        91
VIS    2025250     91400   18.8400 -114.0400       6.5       181       129        98
VIS    2025250     91400   18.8400 -114.0700       8.4       192       136       100
VIS    2025250     91400   18.8300 -114.1000       9.4       200       138        98
VIS    2025250     91400   18.8200 -114.1300       9.2       200       140        97
VIS    2025250     91400   18.8200 -114.1700       7.8       197       141        99
VIS    2025250     91400   18.8300 -114.1900       7.9       198       141       100
VIS    2025250     91400   18.8200 -114.2000       7.9       199       143       100
VIS    2025250     91400   18.8400 -114.2400       8.5       198       148        99
VIS    2025250     91400   18.8200 -114.2700       7.0       183       154       100
VIS    2025250     91400   18.8200 -114.3100       7.7       173       151       100
VIS    2025250     91400   18.8300 -114.3200       8.8       172       151       100
VIS    2025250     91400   18.8100 -114.3500       8.8       177       153        90
VIS    2025250     91400   18.8100 -114.3900       8.7       179       153        95
VIS    2025250     91400   18.8300 -114.4000       8.9       176       152        93
VIS    2025250     91400   18.8300 -114.4400       8.2       174       151        99
VIS    2025250     91400   18.8100 -114.4700       8.8       174       151        99
VIS    2025250     91400   18.8100 -114.4900       8.7       175       151        99
VIS    2025250     91400   18.8100 -114.5300       8.3       179       153        99
VIS    2025250     91400   18.8200 -114.5400       8.6       179       153        98
VIS    2025250     91400   18.8300 -114.5800       8.5       190       154        97
VIS    2025250     91400   18.8100 -114.6000       7.3       199       155        98
VIS    2025250     91400   18.8100 -114.6500       7.5       199       155       100
VIS    2025250     91400   18.8000 -114.6700       7.5       199       155       100
VIS    2025250     91400   18.8200 -114.6900       7.5       199       157       100
VIS    2025250     91400   18.8200 -114.7100       7.9       200       156        98
VIS    2025250     91400   18.7800 -115.6000       4.3       159       177        92
VIS    2025250     91400   18.7800 -115.6300       4.7       172       182        99
VIS    2025250     91400   18.7900 -115.8800       6.0       171       184        97
VIS    2025250     91400   18.7700 -115.9000       5.7       173       185       100
VIS    2025250     91400   18.7700 -116.0000       6.2       165       175        93
VIS    2025250     91400   18.7600 -116.0800       5.4       178       175        99
VIS    2025250     91400   18.7700 -116.0900       5.3       171       178       100
VIS    2025250     91400   18.7800 -116.1100       5.7       177       178       100
VIS    2025250     91400   18.7800 -116.1900       6.1       208       172        98
VIS    2025250     91400   18.7600 -116.2000       5.7       209       174        98
VIS    2025250     91400   18.7800 -116.2300       5.8       198       172       100
VIS    2025250     91400   18.7700 -116.2900       7.5       225       171        91
VIS    2025250     91400   18.7500 -117.3000       5.9         6       181        94
VIS    2025250     91400   18.7400 -117.4900       5.4         0       184        96
VIS    2025250     91400   18.7400 -117.5000       5.3       360       186        98
VIS    2025250     91400   18.7200 -118.0600       4.0        34       183       100
VIS    2025250     91400   18.7100 -118.2000       4.9        33       189        90
VIS    2025250     91400   18.7200 -118.2400       4.5        54       184        98
VIS    2025250     91400   18.7200 -118.3600       7.2        61       162        91
VIS    2025250     91400   18.6900 -119.1700      14.5        20       180        91
VIS    2025250     91400   18.6900 -119.1900      14.4        20       180        90
VIS    2025250     91400   18.7000 -119.2200      11.4         6       177        91
VIS    2025250     91400   18.6800 -119.2500      13.5         6       177        94
VIS    2025250     91400   18.7000 -119.2700      13.8         6       174        95
VIS    2025250     91400   18.9800 -108.5300       4.7        85       187        99
VIS    2025250     91400   18.9800 -108.5400       4.9        83       187        98
VIS    2025250     91400   18.9800 -108.6300       4.9        80       182        97
VIS    2025250     91400   18.9800 -108.6300       5.2        85       181        98
VIS    2025250     91400   18.9800 -108.6800       7.2        82       175       100
VIS    2025250     91400   18.9800 -108.7000       7.1        86       175        98
VIS    2025250     91400   18.9600 -108.7700       5.4       106       181       100
VIS    2025250     91400   18.9600 -108.8100       7.4        98       176        95
VIS    2025250     91400   18.9700 -108.8400       8.1        88       168        98
VIS    2025250     91400   18.9200 -110.0900       5.8        22       161        93
VIS    2025250     91400   18.9200 -110.2200       8.7       103       160       100
VIS    2025250     91400   18.9200 -110.3300      14.2        94       140        95
VIS    2025250     91400   18.9300 -110.3700      13.3        95       141       100
VIS    2025250     91400   18.9100 -110.4000      13.2        95       140       100
VIS    2025250     91400   18.9100 -110.4200      12.9        96       141       100
VIS    2025250     91400   18.9000 -111.1700       8.3        36       166        91
VIS    2025250     91400   18.9000 -111.3100      10.4       111       136        94
VIS    2025250     91400   18.9000 -111.3100      10.3       111       136        93
VIS    2025250     91400   18.9000 -111.4000      13.7       111       126       100
VIS    2025250     91400   18.9000 -111.4200      13.0       113       123       100
VIS    2025250     91400   18.8800 -111.4800      11.2       114       124        92
VIS    2025250     91400   18.8800 -111.5200      11.4       117       125        99
VIS    2025250     91400   18.8900 -111.5300       9.7       117       122       100
VIS    2025250     91400   18.8700 -111.7600      10.4        92       144        93
VIS    2025250     91400   18.8700 -111.7600      10.1        90       144        95
VIS    2025250     91400   18.8800 -111.8100       8.1        89       145       100
VIS    2025250     91400   18.8800 -111.8400       7.5        87       147        99
VIS    2025250     91400   18.8800 -111.8500       7.5        87       147        99
VIS    2025250     91400   18.8700 -111.8800       7.1        87       149       100
VIS    2025250     91400   18.8700 -111.9300       7.2        84       153       100
VIS    2025250     91400   18.8600 -111.9600       7.2        86       153       100
VIS    2025250     91400   18.8800 -111.9700       7.1        86       152       100
VIS    2025250     91400   18.8600 -112.0100       5.7        86       156        98
VIS    2025250     91400   18.8700 -112.0300       5.0        81       163        96
VIS    2025250     91400   18.8600 -112.0700       7.3        84       162       100
VIS    2025250     91400   18.8600 -112.1000       7.7        93       163        98
VIS    2025250     91400   18.8600 -112.1100       8.0        94       160       100
VIS    2025250     91400   18.8500 -112.1600       7.6        81       153       100
VIS    2025250     91400   18.8500 -112.1800       6.8        74       156        99
VIS    2025250     91400   18.8700 -112.2200       5.0        90       158       100
VIS    2025250     91400   18.8500 -112.2500       4.9        91       159        98
VIS    2025250     91400   18.8300 -112.8400       4.3       145       154       100
VIS    2025250     91400   18.8300 -112.8500       4.3       145       154        99
VIS    2025250     91400   18.8500 -112.8700       4.6       143       154       100
VIS    2025250     91400   18.8300 -112.9100       4.8       105       154        95
VIS    2025250     91400   18.8500 -112.9700       6.1       126       147        93
VIS    2025250     91400   18.8300 -113.1000       5.3       127       150        91
VIS    2025250     91400   18.8200 -113.1600       7.4       130       144       100
VIS    2025250     91400   18.8300 -113.1700       7.9       127       142       100
VIS    2025250     91400   18.8200 -113.2700       6.2       133       133       100
VIS    2025250     91400   18.8300 -113.2900       6.7       135       130       100
VIS    2025250     91400   18.8200 -113.3100       6.8       129       130        93
VIS    2025250     91400   18.8000 -113.8300      10.7       187       126        98
VIS    2025250     91400   18.8200 -113.9400       4.4       168       124        97
VIS    2025250     91400   18.8000 -114.0000       4.4       166       126       100
VIS    2025250     91400   18.8000 -114.0300       5.0       169       126        95
VIS    2025250     91400   18.8000 -114.0400       5.3       175       128        96
VIS    2025250     91400   18.8100 -114.0600       6.5       183       130        97
VIS    2025250     91400   18.8000 -114.1000       7.1       176       135        98
VIS    2025250     91400   18.8100 -114.1400       8.3       194       141        93
VIS    2025250     91400   18.8000 -114.1600       7.8       196       143        98
VIS    2025250     91400   18.7900 -114.1800       7.7       198       146        99
VIS    2025250     91400   18.7900 -114.2200       7.8       200       152       100
VIS    2025250     91400   18.8000 -114.2400       7.5       194       155        96
VIS    2025250     91400   18.8100 -114.2700       7.1       185       156       100
VIS    2025250     91400   18.7900 -114.3100       7.8       171       152        98
VIS    2025250     91400   18.7900 -114.3400       8.6       172       151        96
VIS    2025250     91400   18.8000 -114.3500       8.8       173       152        93
VIS    2025250     91400   18.7900 -114.3900       8.8       182       154        93
VIS    2025250     91400   18.7900 -114.4200      10.4       178       154        99
VIS    2025250     91400   18.8000 -114.4500       9.3       174       152        99
VIS    2025250     91400   18.8000 -114.4600       9.2       174       151        99
VIS    2025250     91400   18.8000 -114.4900       8.9       175       151        99
VIS    2025250     91400   18.7900 -114.5200       8.4       180       152        99
VIS    2025250     91400   18.7800 -114.5500       7.3       188       155        98
VIS    2025250     91400   18.7900 -114.6000       5.5       199       155        91
VIS    2025250     91400   18.8000 -114.6200       7.2       202       155       100
VIS    2025250     91400   18.8000 -114.6500       7.4       200       155       100
VIS    2025250     91400   18.8000 -114.6600       7.4       201       155       100
VIS    2025250     91400   18.7800 -114.7000       7.4       198       158        97
VIS    2025250     91400   18.8000 -114.7200       7.6       200       158        98
VIS    2025250     91400   18.8000 -114.7400       7.6       199       158       100
VIS    2025250     91400   18.7700 -114.8100       6.6       200       172        99
VIS    2025250     91400   18.7600 -115.4000       4.3       166       185        92
VIS    2025250     91400   18.7700 -115.6300       4.5       170       182        99
VIS    2025250     91400   18.7700 -115.6400       4.4       177       182       100
VIS    2025250     91400   18.7600 -115.8700       4.6       179       185        98
VIS    2025250     91400   18.7400 -115.9700       7.2       182       183        97
VIS    2025250     91400   18.7600 -116.0300       6.8       165       174        94
VIS    2025250     91400   18.7600 -116.0400       6.7       168       175        92
VIS    2025250     91400   18.7400 -116.0800       6.5       191       181        98
VIS    2025250     91400   18.7500 -116.1000       6.0       182       179        99
VIS    2025250     91400   18.7400 -116.1300       6.4       188       181        99
VIS    2025250     91400   18.7400 -116.1600       5.9       201       179        92
VIS    2025250     91400   18.7600 -116.2000       5.5       208       174        99
VIS    2025250     91400   18.7400 -116.6900       6.2       327       156        91
VIS    2025250     91400   18.7100 -117.5000       5.2       358       176       100
VIS    2025250     91400   18.6700 -119.2300      14.1         5       177        97
VIS    2025250     91400   18.9600 -108.5200       4.5        84       189        98
VIS    2025250     91400   18.9500 -108.5500       5.1        79       187        95
VIS    2025250     91400   18.9600 -108.6000       4.9        49       183        93
VIS    2025250     91400   18.9600 -108.6100       4.8        50       183        93
VIS    2025250     91400   18.9600 -108.6600       6.8        91       177        99
VIS    2025250     91400   18.9500 -108.7000       6.4        87       179        99
VIS    2025250     91400   18.9500 -108.7000       6.1        87       179        99
VIS    2025250     91400   18.9500 -108.7400       5.8       103       180        97
VIS    2025250     91400   18.9400 -108.7700       5.9       104       180       100
VIS    2025250     91400   18.9600 -108.8100       7.4        99       176        94
VIS    2025250     91400   18.9300 -108.9700       5.9        61       181        98
VIS    2025250     91400   18.9400 -109.0200       8.9        66       188       100
VIS    2025250     91400   18.9300 -109.1700       5.5        52       190        91
VIS    2025250     91400   18.9000 -110.0500       7.8        28       165        98
VIS    2025250     91400   18.9000 -110.0800       6.1        22       165        99
VIS    2025250     91400   18.9100 -110.0900       5.8        22       165       100
VIS    2025250     91400   18.8900 -110.2000       8.8        98       158        99
VIS    2025250     91400   18.8900 -110.2200       8.8        99       158        98
VIS    2025250     91400   18.9100 -110.3300      14.2        93       140        90
VIS    2025250     91400   18.8800 -110.3900      13.6        96       134       100
VIS    2025250     91400   18.9000 -110.4100      13.0        95       140       100
VIS    2025250     91400   18.9000 -110.4200      12.7        96       140       100
VIS    2025250     91400   18.8900 -110.4600      11.0        92       140       100
VIS    2025250     91400   18.8800 -110.4800      10.6        91       141       100
VIS    2025250     91400   18.8800 -110.5400      10.1        91       140        98
VIS    2025250     91400   18.8500 -111.3300      12.2       110       140        98
VIS    2025250     91400   18.8500 -111.3900      14.9       105       126        99
VIS    2025250     91400   18.8700 -111.5200      11.5       115       125        98
VIS    2025250     91400   18.8700 -111.5300      11.2       116       125        99
VIS    2025250     91400   18.8500 -111.7700       9.3        89       143        97
VIS    2025250     91400   18.8600 -111.8100       8.2        87       146        99
VIS    2025250     91400   18.8500 -111.8400       7.9        86       148        97
VIS    2025250     91400   18.8600 -111.8800       7.4        87       149        99
VIS    2025250     91400   18.8400 -111.8900       7.4        87       152       100
VIS    2025250     91400   18.8500 -111.9400       7.3        85       150        99
VIS    2025250     91400   18.8500 -111.9400       7.3        84       152       100
VIS    2025250     91400   18.8500 -112.0000       6.6        84       155        99
VIS    2025250     91400   18.8500 -112.0100       6.2        85       156        99
VIS    2025250     91400   18.8400 -112.0300       6.3        85       162        97
VIS    2025250     91400   18.8500 -112.0700       6.9        85       163        98
VIS    2025250     91400   18.8500 -112.1000       7.3        94       163        97
VIS    2025250     91400   18.8300 -112.1400       7.2        88       157       100
VIS    2025250     91400   18.8500 -112.1600       7.4        82       154       100
VIS    2025250     91400   18.8300 -112.1800       6.6        80       156        99
VIS    2025250     91400   18.8500 -112.2200       4.9        82       158        97
VIS    2025250     91400   18.8300 -112.2600       5.0        85       159        93
VIS    2025250     91400   18.8100 -112.7900       5.4       124       158        92
VIS    2025250     91400   18.8100 -112.7900       5.5       123       158        92
VIS    2025250     91400   18.8200 -112.8500       4.0       144       154       100
VIS    2025250     91400   18.8200 -112.9000       4.4        94       155        94
VIS    2025250     91400   18.8200 -113.0100       5.5       126       151        95
VIS    2025250     91400   18.8000 -113.0400       5.3       131       156       100
VIS    2025250     91400   18.8000 -113.0600       4.8       128       156        98
VIS    2025250     91400   18.8200 -113.0900       4.6       123       154        94
VIS    2025250     91400   18.8200 -113.1200       6.4       136       150        99
VIS    2025250     91400   18.8200 -113.1500       7.1       134       147       100
VIS    2025250     91400   18.8100 -113.1800       7.4       131       144        99
VIS    2025250     91400   18.8000 -113.2500       4.6       142       137        98
VIS    2025250     91400   18.8000 -113.2600       4.9       138       137        99
VIS    2025250     91400   18.7900 -113.3100       5.8       117       131        94
VIS    2025250     91400   18.7900 -113.8300       9.2       189       127        96
VIS    2025250     91400   18.7800 -113.8400       7.4       187       127        90
VIS    2025250     91400   18.7800 -113.8700       5.9       175       131        97
VIS    2025250     91400   18.7800 -113.9700       4.8       183       129        99
VIS    2025250     91400   18.7800 -114.0000       4.6       169       126        99
VIS    2025250     91400   18.7800 -114.0100       4.3       166       126        99
VIS    2025250     91400   18.7700 -114.0600       4.6       173       130       100
VIS    2025250     91400   18.7800 -114.0700       5.0       174       131       100
VIS    2025250     91400   18.7700 -114.1100       5.7       173       133        99
VIS    2025250     91400   18.7700 -114.1200       6.2       182       134        98
VIS    2025250     91400   18.7700 -114.1600       7.3       196       146        95
VIS    2025250     91400   18.7800 -114.1800       7.5       198       152        97
VIS    2025250     91400   18.7900 -114.2200       7.9       200       152       100
VIS    2025250     91400   18.7900 -114.2400       7.7       195       155        90
VIS    2025250     91400   18.7600 -114.2900       8.9       182       152       100
VIS    2025250     91400   18.7800 -114.3100       7.9       171       152        97
VIS    2025250     91400   18.7800 -114.3300       8.8       170       151        99
VIS    2025250     91400   18.7700 -114.3600       9.0       173       152        98
VIS    2025250     91400   18.7800 -114.3900       9.1       181       154        97
VIS    2025250     91400   18.7600 -114.4300      10.1       177       154       100
VIS    2025250     91400   18.7600 -114.4600       9.5       177       153       100
VIS    2025250     91400   18.7600 -114.4700       9.2       178       152        99
VIS    2025250     91400   18.7600 -114.5000       8.7       185       153        99
VIS    2025250     91400   18.7800 -114.5200       8.3       184       153        99
VIS    2025250     91400   18.7700 -114.5500       7.8       190       155       100
VIS    2025250     91400   18.7700 -114.6100       5.2       205       156       100
VIS    2025250     91400   18.7500 -114.6500       8.0       208       155       100
VIS    2025250     91400   18.7700 -114.6800       7.7       199       158        99
VIS    2025250     91400   18.7700 -114.7000       7.5       198       158        97
VIS    2025250     91400   18.7700 -114.8200       6.6       201       172        99
VIS    2025250     91400   18.7500 -114.8500       6.5       201       176        90
VIS    2025250     91400   18.7400 -115.4400       4.2       159       180        90
VIS    2025250     91400   18.7200 -115.9600       6.7       197       186        98
VIS    2025250     91400   18.7200 -116.0600       7.1       194       181       100
VIS    2025250     91400   18.7100 -116.0800       7.5       195       181       100
VIS    2025250     91400   18.7200 -116.1200       6.2       194       183        99
VIS    2025250     91400   18.7100 -116.1400       5.6       199       183       100
VIS    2025250     91400   18.7200 -116.1500       5.2       204       181        99
VIS    2025250     91400   18.7100 -116.1800       5.0       197       180        96
VIS    2025250     91400   18.7100 -116.2300       4.0       201       180        99
VIS    2025250     91400   18.6800 -117.4700       5.4         5       170        95
VIS    2025250     91400   18.6900 -117.4800       5.3         3       171        98
VIS    2025250     91400   18.6600 -118.6500      12.0        23       170        96
VIS    2025250     91400   18.6500 -118.7000      11.8        23       170       100
VIS    2025250     91400   18.6500 -118.7000      11.8        23       169        99
VIS    2025250     91400   18.6500 -118.7300      11.0        19       169        97
VIS    2025250     91400   18.9400 -108.5300       4.6        85       189        96
VIS    2025250     91400   18.9200 -108.5600       4.6        64       179       100
VIS    2025250     91400   18.9200 -108.7100       5.3       102       182        96
VIS    2025250     91400   18.9300 -108.7400       5.9       104       182        96
VIS    2025250     91400   18.9300 -108.7900       7.5       104       176        97
VIS    2025250     91400   18.9300 -108.9700       5.8        54       181        99
VIS    2025250     91400   18.9200 -109.0100       8.9        67       182        99
VIS    2025250     91400   18.9000 -109.1000       4.2        37       188        94
VIS    2025250     91400   18.9100 -109.1600       5.9        52       189       100
VIS    2025250     91400   18.8700 -110.0900       7.1        21       167        93
VIS    2025250     91400   18.8800 -110.0900       6.7        19       167        94
VIS    2025250     91400   18.8900 -110.2100       8.6        96       158        97
VIS    2025250     91400   18.8800 -110.2200       8.9        98       158        98
VIS    2025250     91400   18.8800 -110.2700       8.9        96       158        97
VIS    2025250     91400   18.8800 -110.3900      13.5        96       129       100
VIS    2025250     91400   18.8800 -110.4000      12.9        96       134       100
VIS    2025250     91400   18.8600 -110.4500      10.7        91       136       100
VIS    2025250     91400   18.8600 -110.4800      10.6        89       137       100
VIS    2025250     91400   18.8700 -110.4900      10.4        90       140        99
VIS    2025250     91400   18.8500 -110.5300       9.4        91       135        92
VIS    2025250     91400   18.8500 -111.3200      12.2       110       140        90
VIS    2025250     91400   18.8400 -111.3500      13.0       104       137        95
VIS    2025250     91400   18.8300 -111.3800      14.5        97       129        97
VIS    2025250     91400   18.8300 -111.3900      14.8        98       129        98
VIS    2025250     91400   18.8300 -111.4500       9.3       109       124       100
VIS    2025250     91400   18.8400 -111.5600       9.7       104       130        90
VIS    2025250     91400   18.8200 -111.6100       8.4        80       133       100
VIS    2025250     91400   18.8400 -111.7300       8.1        71       142        96
VIS    2025250     91400   18.8300 -111.7500       8.4        74       140        99
VIS    2025250     91400   18.8300 -111.7800       8.4        86       140        99
VIS    2025250     91400   18.8200 -111.8200       7.8        87       144        95
VIS    2025250     91400   18.8300 -111.8300       7.8        87       146        96
VIS    2025250     91400   18.8300 -111.8800       7.3        88       152       100
VIS    2025250     91400   18.8100 -111.9200       7.0        87       153       100
VIS    2025250     91400   18.8300 -111.9200       7.2        86       149        99
VIS    2025250     91400   18.8200 -111.9500       7.3        85       150        97
VIS    2025250     91400   18.8100 -111.9900       7.5        78       159        98
VIS    2025250     91400   18.8300 -112.0300       6.8        85       162        99
VIS    2025250     91400   18.8100 -112.0600       6.9        91       164        94
VIS    2025250     91400   18.8200 -112.1000       6.5       101       164        96
VIS    2025250     91400   18.8200 -112.1200       6.8        95       164       100
VIS    2025250     91400   18.8000 -112.1600       7.3        87       153        99
VIS    2025250     91400   18.8200 -112.1800       6.6        81       155        98
VIS    2025250     91400   18.8000 -112.2200       4.8        80       155        97
VIS    2025250     91400   18.7900 -112.7500       5.1       131       164       100
VIS    2025250     91400   18.8000 -112.7800       5.4       127       160        99
VIS    2025250     91400   18.8000 -112.8000       5.4       124       158       100
VIS    2025250     91400   18.7800 -112.9300       5.6        53       161        96
VIS    2025250     91400   18.7900 -113.0300       5.7       129       156        98
VIS    2025250     91400   18.7800 -113.0300       5.6       132       161        95
VIS    2025250     91400   18.8000 -113.0800       5.1       131       156        96
VIS    2025250     91400   18.7900 -113.1100       6.3       140       156        93
VIS    2025250     91400   18.7700 -113.1400       6.6       144       151        96
VIS    2025250     91400   18.7700 -113.1500       6.4       145       150        94
VIS    2025250     91400   18.7700 -113.2000       5.0       130       145        97
VIS    2025250     91400   18.7800 -113.2300       4.1       143       143        99
VIS    2025250     91400   18.7900 -113.2600       4.7       141       137        97
VIS    2025250     91400   18.7700 -113.2800       5.5       126       136        98
VIS    2025250     91400   18.7700 -113.3100       5.7       114       133       100
VIS    2025250     91400   18.7700 -113.6000       5.2       203       132       100
VIS    2025250     91400   18.7600 -113.7100       8.1       172       137        94
VIS    2025250     91400   18.7600 -113.8300       7.7       180       136        92
VIS    2025250     91400   18.7500 -113.8600       6.3       177       136        99
VIS    2025250     91400   18.7600 -113.8900       5.5       169       142        99
VIS    2025250     91400   18.7700 -113.9600       5.0       187       138        95
VIS    2025250     91400   18.7500 -114.0100       4.8       169       139       100
VIS    2025250     91400   18.7500 -114.0300       4.0       170       131        99
VIS    2025250     91400   18.7500 -114.1100       4.1       172       129       100
VIS    2025250     91400   18.7600 -114.1600       6.6       197       148        95
VIS    2025250     91400   18.7500 -114.2100       7.7       199       157       100
VIS    2025250     91400   18.7500 -114.2300       8.4       197       157        99
VIS    2025250     91400   18.7400 -114.3000       9.3       181       149        97
VIS    2025250     91400   18.7500 -114.3500       9.0       171       150        91
VIS    2025250     91400   18.7600 -114.3700       8.5       175       152       100
VIS    2025250     91400   18.7600 -114.3900       9.1       179       154       100
VIS    2025250     91400   18.7500 -114.4300       9.9       178       154        99
VIS    2025250     91400   18.7300 -114.4700       9.0       182       153        99
VIS    2025250     91400   18.7500 -114.4700       8.8       182       152        99
VIS    2025250     91400   18.7500 -114.5000       8.7       185       153        99
VIS    2025250     91400   18.7500 -114.5200       8.9       189       154       100
VIS    2025250     91400   18.7400 -114.5800      10.3       210       158       100
VIS    2025250     91400   18.7500 -114.5900       9.4       209       158        99
VIS    2025250     91400   18.7500 -114.6100       9.6       218       158        97
VIS    2025250     91400   18.7300 -114.6500       8.5       208       158        92
VIS    2025250     91400   18.7400 -114.7800       7.9       188       167        90
VIS    2025250     91400   18.7300 -114.8300       6.6       204       174        96
VIS    2025250     91400   18.7400 -114.8500       6.6       202       176        92
VIS    2025250     91400   18.7200 -114.9500      11.4       213       175       100
VIS    2025250     91400   18.7300 -114.9700       5.1       225       181        94
VIS    2025250     91400   18.7100 -115.9700       6.8       203       183        97
VIS    2025250     91400   18.6900 -116.0400       6.5       190       185        95
VIS    2025250     91400   18.7100 -116.0700       7.4       195       183       100
VIS    2025250     91400   18.7100 -116.0800       7.6       195       182       100
VIS    2025250     91400   18.7100 -116.1000       7.4       192       182       100
VIS    2025250     91400   18.7100 -116.1400       5.6       199       183       100
VIS    2025250     91400   18.7000 -116.1700       4.9       201       180       100
VIS    2025250     91400   18.7000 -116.1900       4.8       197       180        95
VIS    2025250     91400   18.6600 -117.4800       6.2       360       170        94
VIS    2025250     91400   18.6600 -117.5000       7.0       353       180       100
VIS    2025250     91400   18.6600 -117.5100       6.8       355       175        99
VIS    2025250     91400   18.6400 -118.1100       4.4        61       183        96
VIS    2025250     91400   18.6400 -118.6700      12.2        22       170        99
VIS    2025250     91400   18.6200 -118.7000      11.1        15       168        98
VIS    2025250     91400   18.6400 -118.7100      11.4        20       169        99
VIS    2025250     91400   18.6400 -118.7300      11.0        19       169        98
VIS    2025250     91400   18.6300 -119.0300      13.3        18       173        97
VIS    2025250     91400   18.9100 -108.5500       4.9        56       181        97
VIS    2025250     91400   18.9000 -108.5600       4.8        52       179        97
VIS    2025250     91400   18.8900 -108.6800      11.2        76       187        96
VIS    2025250     91400   18.9000 -108.7000       4.3       121       184        97
VIS    2025250     91400   18.9000 -108.7300       6.5       103       182       100
VIS    2025250     91400   18.9000 -108.7700       9.0        98       175        99
VIS    2025250     91400   18.9000 -108.7800       8.8        98       175       100
VIS    2025250     91400   18.8900 -108.9500       6.2        67       170        90
VIS    2025250     91400   18.8800 -108.9700       4.8        61       173        92
VIS    2025250     91400   18.8800 -109.0000       4.8        63       173        93
VIS    2025250     91400   18.8800 -109.1300       6.6        50       189        99
VIS    2025250     91400   18.8700 -109.1600       7.0        60       186       100
VIS    2025250     91400   18.8500 -110.1900       6.9        72       158        92
VIS    2025250     91400   18.8500 -110.2200       8.9        92       154       100
VIS    2025250     91400   18.8400 -110.3800      13.2        96       129        96
VIS    2025250     91400   18.8500 -110.4100      12.8        96       129        97
VIS    2025250     91400   18.8400 -110.4600      11.0        89       129       100
VIS    2025250     91400   18.8300 -110.4600      11.1        88       129        99
VIS    2025250     91400   18.8400 -110.5100       9.7        90       132        96
VIS    2025250     91400   18.8500 -110.5200       9.6        90       135        96
VIS    2025250     91400   18.8300 -110.5600       8.8        91       131        97
VIS    2025250     91400   18.8400 -110.6000      11.0       100       134        97
VIS    2025250     91400   18.8100 -111.1600       6.7        91       161        98
VIS    2025250     91400   18.8100 -111.3300      10.9       101       146        97
VIS    2025250     91400   18.8200 -111.3400      12.1       100       143       100
VIS    2025250     91400   18.8100 -111.3900      13.8        94       133        97
VIS    2025250     91400   18.8200 -111.3900      14.6        96       129        98
VIS    2025250     91400   18.8000 -111.4800       8.5        98       123        93
VIS    2025250     91400   18.8000 -111.5000       8.6        87       124        94
VIS    2025250     91400   18.8100 -111.5100       9.3        96       124        90
VIS    2025250     91400   18.8200 -111.6100       8.4        78       133       100
VIS    2025250     91400   18.8000 -111.7400       9.1        72       142        99
VIS    2025250     91400   18.8000 -111.7500       9.2        73       142       100
VIS    2025250     91400   18.8100 -111.8300       7.4        85       143        93
VIS    2025250     91400   18.7900 -111.8900       6.9        80       150       100
VIS    2025250     91400   18.8100 -111.9200       6.9        86       154       100
VIS    2025250     91400   18.8100 -111.9200       6.9        85       154       100
VIS    2025250     91400   18.7900 -111.9700       7.6        78       159        99
VIS    2025250     91400   18.7800 -111.9900       8.0        77       159        98
VIS    2025250     91400   18.7800 -112.0300       7.6        82       165        99
VIS    2025250     91400   18.8000 -112.0500       7.4        84       164       100
VIS    2025250     91400   18.8000 -112.0800       6.8        94       164       100
VIS    2025250     91400   18.7800 -112.1100       7.0        89       165       100
VIS    2025250     91400   18.7800 -112.1600       7.8        87       150       100
VIS    2025250     91400   18.8000 -112.1600       7.4        87       153        99
VIS    2025250     91400   18.7900 -112.2100       5.3        78       154        97
VIS    2025250     91400   18.8000 -112.2200       4.7        80       155        96
VIS    2025250     91400   18.7700 -112.7100       4.3       112       163        99
VIS    2025250     91400   18.7700 -112.7200       4.3       115       161        98
VIS    2025250     91400   18.7800 -112.7600       4.8       130       162       100
VIS    2025250     91400   18.7700 -112.8000       4.7       128       161       100
VIS    2025250     91400   18.7800 -112.8200       4.5       126       158       100
VIS    2025250     91400   18.7700 -113.0700       5.6       141       160        95
VIS    2025250     91400   18.7500 -113.1000       6.9       154       156       100
VIS    2025250     91400   18.7600 -113.1300       6.8       147       154        97
VIS    2025250     91400   18.7600 -113.1800       5.7       144       146        91
VIS    2025250     91400   18.7700 -113.1900       5.2       131       145        99
VIS    2025250     91400   18.7500 -113.2200       4.8       131       142        99
VIS    2025250     91400   18.7600 -113.2600       5.5       129       140        96
VIS    2025250     91400   18.7600 -113.2800       5.7       123       136        99
VIS    2025250     91400   18.7600 -113.3000       5.9       114       136        99
VIS    2025250     91400   18.7400 -113.4300       4.6       146       142        98
VIS    2025250     91400   18.7500 -113.5700       5.2       195       132        99
VIS    2025250     91400   18.7400 -113.6000       5.7       189       133        97
VIS    2025250     91400   18.7500 -113.6300       8.3       182       134        97
VIS    2025250     91400   18.7400 -113.6700       8.8       174       133       100
VIS    2025250     91400   18.7400 -113.6800       8.8       172       133       100
VIS    2025250     91400   18.7400 -113.7300       7.4       172       139        93
VIS    2025250     91400   18.7300 -113.8100       7.0       171       144       100
VIS    2025250     91400   18.7500 -113.8300       7.2       175       136        99
VIS    2025250     91400   18.7500 -113.8600       6.2       176       142        99
VIS    2025250     91400   18.7400 -113.8700       6.3       174       147       100
VIS    2025250     91400   18.7500 -113.9100       4.4       164       151        92
VIS    2025250     91400   18.7400 -113.9800       6.3       176       154        99
VIS    2025250     91400   18.7300 -114.0100       4.5       168       141       100
VIS    2025250     91400   18.7300 -114.0200       4.3       168       154        99
VIS    2025250     91400   18.7300 -114.1700       4.7       200       159        97
VIS    2025250     91400   18.7200 -114.2100       6.1       187       153       100
VIS    2025250     91400   18.7200 -114.2400       7.7       176       148        95
VIS    2025250     91400   18.7200 -114.2500       7.9       175       148        95
VIS    2025250     91400   18.7200 -114.2800       8.7       177       148        98
VIS    2025250     91400   18.7200 -114.3100       9.2       176       148        98
VIS    2025250     91400   18.7300 -114.3300       9.5       177       149        94
VIS    2025250     91400   18.7200 -114.4000       8.8       180       152        97
VIS    2025250     91400   18.7300 -114.4400       9.7       181       154       100
VIS    2025250     91400   18.7200 -114.4600       9.2       182       154       100
VIS    2025250     91400   18.7200 -114.4800       8.5       187       153        98
VIS    2025250     91400   18.7100 -114.5100       8.4       191       156        99
VIS    2025250     91400   18.7200 -114.5300       8.9       195       157        99
VIS    2025250     91400   18.7100 -114.5700       9.1       212       158       100
VIS    2025250     91400   18.7100 -114.5900       9.2       216       158       100
VIS    2025250     91400   18.7000 -114.6400       8.2       208       157        94
VIS    2025250     91400   18.7100 -114.6500       8.3       207       157        90
VIS    2025250     91400   18.7000 -114.7300       9.6       213       160        91
VIS    2025250     91400   18.7200 -114.8100       7.2       201       174       100
VIS    2025250     91400   18.7200 -114.8400       6.7       204       180        92
VIS    2025250     91400   18.7000 -114.8600       6.0       215       180        91
VIS    2025250     91400   18.7000 -114.9200       9.5       223       181       100
VIS    2025250     91400   18.7000 -114.9500      11.5       211       181        95
VIS    2025250     91400   18.6900 -115.0100       5.5       215       182       100
VIS    2025250     91400   18.6900 -115.1100       5.1       188       181       100
VIS    2025250     91400   18.7000 -115.1400       5.5       181       185        97
VIS    2025250     91400   18.7000 -115.5700       4.3       154       175        98
VIS    2025250     91400   18.6700 -115.9800       6.5       200       184        92
VIS    2025250     91400   18.6700 -116.0100       6.5       190       184        98
VIS    2025250     91400   18.6700 -116.0300       6.3       192       186        96
VIS    2025250     91400   18.6800 -116.0700       7.1       197       184        99
VIS    2025250     91400   18.6600 -116.1000       6.8       195       184        99
VIS    2025250     91400   18.6800 -116.1000       7.0       195       184        99
VIS    2025250     91400   18.6800 -116.1600       5.5       201       184       100
VIS    2025250     91400   18.6800 -116.1800       4.7       195       180        99
VIS    2025250     91400   18.6800 -116.1900       4.4       197       180        94
VIS    2025250     91400   18.6700 -116.5500       4.1        98       168        98
VIS    2025250     91400   18.6400 -117.5000       7.0       350       181        99
VIS    2025250     91400   18.6200 -118.1100       5.1        51       181        97
VIS    2025250     91400   18.6100 -118.1500       4.1        70       180       100
VIS    2025250     91400   18.6300 -118.2200       4.6        33       188        97
VIS    2025250     91400   18.6100 -118.3200      10.2        26       143        97
VIS    2025250     91400   18.6200 -118.3600      11.0        28       163        90
VIS    2025250     91400   18.6300 -118.3900      10.4        24       165        99
VIS    2025250     91400   18.6100 -118.4300      13.4        11       175        91
VIS    2025250     91400   18.6000 -118.6800      10.5        10       171        98
VIS    2025250     91400   18.6200 -118.7300      10.5        10       168       100
VIS    2025250     91400   18.6000 -119.0300      12.7        21       169        98
VIS    2025250     91400   18.5900 -119.0400      12.3        31       169        96
VIS    2025250     91400   18.5800 -119.2300      13.1        10       177       100
VIS    2025250     91400   18.5800 -119.2600      12.7        12       177        94
VIS    2025250     91400   18.8700 -108.5300       7.4        33       189       100
VIS    2025250     91400   18.8700 -108.5500       6.5        42       185       100
VIS    2025250     91400   18.8700 -108.5900       5.0        41       179        98
VIS    2025250     91400   18.8800 -108.6000       5.0        42       177        99
VIS    2025250     91400   18.8900 -108.6800      11.0        75       188        98
VIS    2025250     91400   18.8600 -108.7000      10.0        78       187       100
VIS    2025250     91400   18.8700 -108.7500       8.1        87       173        99
VIS    2025250     91400   18.8700 -108.7500       8.3        92       173       100
VIS    2025250     91400   18.8800 -108.7900       9.5       100       167        98
VIS    2025250     91400   18.8700 -108.9200       6.8        79       169        90
VIS    2025250     91400   18.8800 -108.9400       6.5        72       170        95
VIS    2025250     91400   18.8600 -109.0000       5.3        71       174        97
VIS    2025250     91400   18.8600 -109.0000       4.5        75       174        96
VIS    2025250     91400   18.8600 -109.1100       5.3        47       189        99
VIS    2025250     91400   18.8700 -109.1200       6.6        48       186        95
VIS    2025250     91400   18.8700 -109.1500       7.4        56       186        99
VIS    2025250     91400   18.8300 -110.2600       8.5        90       152        94
VIS    2025250     91400   18.8300 -110.4300      12.1        90       129        96
VIS    2025250     91400   18.8100 -110.4500      11.8        87       125        98
VIS    2025250     91400   18.8200 -110.4800      10.8        86       128        98
VIS    2025250     91400   18.8100 -110.5000      10.4        86       125        96
VIS    2025250     91400   18.8100 -110.5500       8.9        89       131        99
VIS    2025250     91400   18.8000 -110.5700       8.7        89       131        99
VIS    2025250     91400   18.8000 -110.6000       8.8        94       134       100
VIS    2025250     91400   18.8000 -110.6300       9.5       102       138       100
VIS    2025250     91400   18.7900 -111.1700       8.9        97       156        98
VIS    2025250     91400   18.7800 -111.2300       8.3        93       160       100
VIS    2025250     91400   18.7800 -111.3200       8.7       100       150        96
VIS    2025250     91400   18.7900 -111.3500      12.6        97       144        93
VIS    2025250     91400   18.7800 -111.3900      13.3        97       132       100
VIS    2025250     91400   18.7800 -111.4000      13.6        97       132       100
VIS    2025250     91400   18.7800 -111.5100       9.0        85       127        99
VIS    2025250     91400   18.7900 -111.5200       8.9        89       125        97
VIS    2025250     91400   18.7800 -111.5600       9.3        90       134        95
VIS    2025250     91400   18.7900 -111.6300       9.3        71       139        91
VIS    2025250     91400   18.7700 -111.6900      10.0        73       146       100
VIS    2025250     91400   18.7800 -111.6900       9.9        73       146       100
VIS    2025250     91400   18.7700 -111.7300       8.8        78       147       100
VIS    2025250     91400   18.7600 -111.7700       9.5        79       143       100
VIS    2025250     91400   18.7700 -111.8400       7.3        80       143        93
VIS    2025250     91400   18.7600 -111.8900       7.1        70       150        96
VIS    2025250     91400   18.7800 -111.9000       6.7        76       152       100
VIS    2025250     91400   18.7700 -111.9500       6.9        78       160        98
VIS    2025250     91400   18.7700 -111.9800       7.7        80       159        98
VIS    2025250     91400   18.7800 -111.9900       8.0        77       159        98
VIS    2025250     91400   18.7700 -112.0300       7.9        83       162        97
VIS    2025250     91400   18.7800 -112.0500       7.6        83       165        99
VIS    2025250     91400   18.7600 -112.1000       7.9        75       165        97
VIS    2025250     91400   18.7700 -112.1100       7.9        77       165        96
VIS    2025250     91400   18.7700 -112.1600       7.7        86       150       100
VIS    2025250     91400   18.7700 -112.1600       7.7        86       150       100
VIS    2025250     91400   18.7600 -112.2000       5.5        81       150        97
VIS    2025250     91400   18.7700 -112.2300       4.4        93       154        95
VIS    2025250     91400   18.7500 -112.6900       4.4       105       164        98
VIS    2025250     91400   18.7600 -112.7300       4.0       110       161        98
VIS    2025250     91400   18.7400 -112.7800       5.6       132       164        96
VIS    2025250     91400   18.7400 -113.1000       7.7       160       154        96
VIS    2025250     91400   18.7200 -113.1800       6.9       142       147        97
VIS    2025250     91400   18.7200 -113.1900       6.9       141       147        99
VIS    2025250     91400   18.7300 -113.2200       6.6       131       143       100
VIS    2025250     91400   18.7300 -113.2600       6.3       133       140       100
VIS    2025250     91400   18.7300 -113.2900       5.9       129       140        99
VIS    2025250     91400   18.7300 -113.3100       5.5       122       137        98
VIS    2025250     91400   18.7200 -113.4100       4.0       114       143        92
VIS    2025250     91400   18.7200 -113.4300       9.0       168       143       100
VIS    2025250     91400   18.7300 -113.4500       6.0       152       142        91
VIS    2025250     91400   18.7200 -113.5900       6.0       182       130        91
VIS    2025250     91400   18.7100 -113.6200       6.2       183       132        95
VIS    2025250     91400   18.7100 -113.6200       6.5       183       133        96
VIS    2025250     91400   18.7100 -113.6600       8.4       177       138        99
VIS    2025250     91400   18.7200 -113.6800       9.1       172       135       100
VIS    2025250     91400   18.7300 -113.7200       7.6       171       140        91
VIS    2025250     91400   18.7100 -113.7600       7.7       181       147        94
VIS    2025250     91400   18.7000 -113.7800       8.7       183       154        96
VIS    2025250     91400   18.7200 -113.8100       7.2       173       151       100
VIS    2025250     91400   18.7000 -113.8400       6.6       171       149        99
VIS    2025250     91400   18.7100 -113.8700       6.9       170       147       100
VIS    2025250     91400   18.7000 -113.9000       7.3       172       153       100
VIS    2025250     91400   18.7000 -113.9100       7.3       172       153       100
VIS    2025250     91400   18.7100 -114.0200       4.7       168       157        99
VIS    2025250     91400   18.7200 -114.0300       4.5       170       154        97
VIS    2025250     91400   18.7200 -114.0600       4.5       171       142        97
VIS    2025250     91400   18.7000 -114.0900       4.8       162       154        99
VIS    2025250     91400   18.6900 -114.1900       4.4       179       156        98
VIS    2025250     91400   18.6900 -114.2500       7.5       170       147        97
VIS    2025250     91400   18.6900 -114.2900       8.7       169       147       100
VIS    2025250     91400   18.6900 -114.3200       8.8       177       146       100
VIS    2025250     91400   18.6900 -114.3400       8.7       191       145       100
VIS    2025250     91400   18.7000 -114.3700       8.3       189       146       100
VIS    2025250     91400   18.7000 -114.3900       7.8       192       146        97
VIS    2025250     91400   18.6900 -114.4300       9.3       188       151       100
VIS    2025250     91400   18.7000 -114.4600       9.4       184       152        96
VIS    2025250     91400   18.7000 -114.4800       9.0       185       153        91
VIS    2025250     91400   18.6900 -114.5300       8.5       199       157       100
VIS    2025250     91400   18.6900 -114.5600       7.9       212       158       100
VIS    2025250     91400   18.6900 -114.5600       7.7       216       158        99
VIS    2025250     91400   18.6800 -114.6000       7.8       223       156        97
VIS    2025250     91400   18.7000 -114.6300       8.4       209       157        97
VIS    2025250     91400   18.6800 -114.6500       8.2       203       157        98
VIS    2025250     91400   18.6900 -114.6800       8.6       203       160        95
VIS    2025250     91400   18.6800 -114.7300       9.0       215       161        91
VIS    2025250     91400   18.6900 -114.7400       9.3       217       162        95
VIS    2025250     91400   18.6800 -114.8400       5.8       224       178        98
VIS    2025250     91400   18.6700 -114.8700       5.3       223       181        98
VIS    2025250     91400   18.6700 -114.8800       5.2       223       183        97
VIS    2025250     91400   18.6900 -114.9500      11.1       213       181       100
VIS    2025250     91400   18.6800 -114.9600      11.0       210       181        98
VIS    2025250     91400   18.6900 -115.0000       5.8       211       182        99
VIS    2025250     91400   18.6700 -115.1000       5.1       197       181       100
VIS    2025250     91400   18.6900 -115.1100       5.0       189       180       100
VIS    2025250     91400   18.6800 -115.1300       5.1       188       179        97
VIS    2025250     91400   18.6500 -115.9700       6.4       192       188       100
VIS    2025250     91400   18.6500 -115.9900       6.8       192       186       100
VIS    2025250     91400   18.6600 -116.0100       6.6       191       186        99
VIS    2025250     91400   18.6600 -116.0500       6.3       193       186        97
VIS    2025250     91400   18.6600 -116.0600       6.6       194       184        99
VIS    2025250     91400   18.6600 -116.1000       6.8       194       184        99
VIS    2025250     91400   18.6500 -116.1200       6.4       198       185        99
VIS    2025250     91400   18.6400 -116.1400       6.5       198       186       100
VIS    2025250     91400   18.6600 -116.1600       6.5       188       184       100
VIS    2025250     91400   18.6500 -116.2200       5.0       179       184        98
VIS    2025250     91400   18.6400 -116.2200       5.0       178       182        99
VIS    2025250     91400   18.6000 -118.3600      11.0        27       157        92
VIS    2025250     91400   18.5900 -118.3900      10.8        20       164        95
VIS    2025250     91400   18.5700 -119.0100      11.5        25       167        99
VIS    2025250     91400   18.5700 -119.0600      11.4        36       166        98
VIS    2025250     91400   18.5600 -119.0600      11.3        36       165        99
VIS    2025250     91400   18.5600 -119.1900       9.4        40       177        97
VIS    2025250     91400   18.5800 -119.2300      12.4        11       177        97
VIS    2025250     91400   18.5800 -119.2600      12.6        12       177        93
VIS    2025250     91400   18.8700 -108.5300       7.4        33       189        99
VIS    2025250     91400   18.8600 -108.5900       5.1        42       179       100
VIS    2025250     91400   18.8600 -108.6000       5.1        42       177       100
VIS    2025250     91400   18.8600 -108.6800      10.9        84       184        92
VIS    2025250     91400   18.8600 -108.7100       9.5        78       187       100
VIS    2025250     91400   18.8500 -108.7400       7.9        76       178        94
VIS    2025250     91400   18.8400 -108.7600       8.1        85       171       100
VIS    2025250     91400   18.8400 -108.7900       7.9        95       158       100
VIS    2025250     91400   18.8500 -108.8300       7.3       105       157        97
VIS    2025250     91400   18.8500 -108.8600       5.8        93       160        92
VIS    2025250     91400   18.8400 -108.9000       5.9        78       164        99
VIS    2025250     91400   18.8400 -108.9400       7.3        70       167       100
VIS    2025250     91400   18.8300 -108.9500       7.5        71       167        99
VIS    2025250     91400   18.8400 -109.0400       8.3        55       180        96
VIS    2025250     91400   18.8400 -109.1700       8.9        58       188        98
VIS    2025250     91400   18.7900 -110.2300       8.1        37       151       100
VIS    2025250     91400   18.8100 -110.2700       7.8        53       151       100
VIS    2025250     91400   18.7900 -110.3000       8.6        35       151        98
VIS    2025250     91400   18.7900 -110.3400       8.5        24       150        98
VIS    2025250     91400   18.7800 -110.3600       8.5        26       142        95
VIS    2025250     91400   18.8000 -110.4000      12.4        93       126       100
VIS    2025250     91400   18.7800 -110.4400      12.0        88       126        99
VIS    2025250     91400   18.7800 -110.4500      11.9        88       125        99
VIS    2025250     91400   18.7800 -110.4900      11.2        86       119        97
VIS    2025250     91400   18.7800 -110.5100      10.8        86       119        94
VIS    2025250     91400   18.7900 -110.5600       9.2        89       130       100
VIS    2025250     91400   18.8000 -110.5700       8.9        89       131        99
VIS    2025250     91400   18.7900 -110.6100       8.9        96       137       100
VIS    2025250     91400   18.7800 -110.6300       8.9        95       147        99
VIS    2025250     91400   18.7900 -110.6600       9.8       105       164       100
VIS    2025250     91400   18.7600 -111.1800       9.4        99       154       100
VIS    2025250     91400   18.7600 -111.2200       9.0        97       155        99
VIS    2025250     91400   18.7700 -111.2400       8.7        96       155        95
VIS    2025250     91400   18.7600 -111.3100       7.7        95       156        93
VIS    2025250     91400   18.7700 -111.3900      13.1        98       132        99
VIS    2025250     91400   18.7700 -111.4100      13.5        98       132        99
VIS    2025250     91400   18.7600 -111.5100       9.2        86       132        99
VIS    2025250     91400   18.7600 -111.5200       9.4        87       135       100
VIS    2025250     91400   18.7700 -111.5500      10.0        89       135       100
VIS    2025250     91400   18.7700 -111.5800       9.9        93       139       100
VIS    2025250     91400   18.7400 -111.6700      10.6        71       148        98
VIS    2025250     91400   18.7500 -111.7200       8.4        77       147       100
VIS    2025250     91400   18.7600 -111.7500       9.0        79       146        99
VIS    2025250     91400   18.7600 -111.7700       9.3        80       145       100
VIS    2025250     91400   18.7500 -111.8700       7.4        69       147       100
VIS    2025250     91400   18.7600 -111.8900       7.1        67       151        95
VIS    2025250     91400   18.7400 -111.9300       6.3        70       161        99
VIS    2025250     91400   18.7500 -111.9600       6.9        76       164        98
VIS    2025250     91400   18.7400 -111.9900       7.5        80       164        94
VIS    2025250     91400   18.7300 -112.0900       6.9        79       160        92
VIS    2025250     91400   18.7300 -112.1200       7.5        85       159        99
VIS    2025250     91400   18.7400 -112.1500       7.6        88       152       100
VIS    2025250     91400   18.7500 -112.1800       6.6        84       148        97
VIS    2025250     91400   18.7400 -112.2100       5.4        87       150        98
VIS    2025250     91400   18.7300 -112.2500       5.8       102       156        99
VIS    2025250     91400   18.7000 -113.1100       7.6       171       151        98
VIS    2025250     91400   18.7200 -113.1400       7.8       155       150        90
VIS    2025250     91400   18.7200 -113.1800       6.6       140       147       100
VIS    2025250     91400   18.7000 -113.2000       6.7       136       147       100
VIS    2025250     91400   18.7000 -113.2300       6.9       131       145        99
VIS    2025250     91400   18.7100 -113.2500       6.9       134       142        98
VIS    2025250     91400   18.7000 -113.2900       5.9       131       140        94
VIS    2025250     91400   18.7100 -113.3200       4.4       125       139        99
VIS    2025250     91400   18.6900 -113.4200       9.5       166       143       100
VIS    2025250     91400   18.6900 -113.4800       7.9       173       136        98
VIS    2025250     91400   18.6900 -113.5000       7.9       172       136        98
VIS    2025250     91400   18.6900 -113.5300       6.8       162       131        94
VIS    2025250     91400   18.7000 -113.5700       5.8       177       127        98
VIS    2025250     91400   18.6900 -113.6000       5.3       181       127        98
VIS    2025250     91400   18.7000 -113.6200       6.5       183       132        95
VIS    2025250     91400   18.6900 -113.6700       8.5       177       138        98
VIS    2025250     91400   18.6800 -113.6900       9.1       177       141       100
VIS    2025250     91400   18.6900 -113.7200       8.3       169       140        99
VIS    2025250     91400   18.6900 -113.7500       6.9       165       146        95
VIS    2025250     91400   18.7000 -113.7800       8.6       182       154        95
VIS    2025250     91400   18.6800 -113.8100       8.1       179       154       100
VIS    2025250     91400   18.7000 -113.8300       6.8       174       149        99
VIS    2025250     91400   18.6800 -113.8800       8.1       168       151       100
VIS    2025250     91400   18.6900 -113.9000       7.6       167       151        99
VIS    2025250     91400   18.6900 -113.9100       7.4       169       155        98
VIS    2025250     91400   18.6800 -113.9500       8.1       171       162        94
VIS    2025250     91400   18.6700 -113.9800       8.8       174       161        99
VIS    2025250     91400   18.6800 -114.0400       5.7       164       157        91
VIS    2025250     91400   18.6900 -114.0500       5.6       166       157        94
VIS    2025250     91400   18.6900 -114.1100       4.8       159       154       100
VIS    2025250     91400   18.6900 -114.1100       4.6       160       154        99
VIS    2025250     91400   18.6700 -114.1600       5.4       174       152        96
VIS    2025250     91400   18.6800 -114.1700       4.5       181       156        97
VIS    2025250     91400   18.6800 -114.2200       5.3       170       149        92
VIS    2025250     91400   18.6900 -114.2300       5.7       170       148        91
VIS    2025250     91400   18.6900 -114.2500       7.6       170       147        97
VIS    2025250     91400   18.6700 -114.3100       8.7       174       147       100
VIS    2025250     91400   18.6700 -114.3100       8.7       175       146       100
VIS    2025250     91400   18.6700 -114.3500       8.2       197       144       100
VIS    2025250     91400   18.6700 -114.3700       7.9       197       142       100
VIS    2025250     91400   18.6800 -114.4000       7.8       196       145        99
VIS    2025250     91400   18.6800 -114.4500       9.3       189       151        99
VIS    2025250     91400   18.6800 -114.4800      10.0       185       152        97
VIS    2025250     91400   18.6700 -114.4800      10.1       185       151        97
VIS    2025250     91400   18.6700 -114.5300       8.6       197       156       100
VIS    2025250     91400   18.6800 -114.5600       7.6       214       156       100
VIS    2025250     91400   18.6700 -114.5700       7.2       219       156       100
VIS    2025250     91400   18.6600 -114.6000       8.7       218       155        90
VIS    2025250     91400   18.6600 -114.6500       9.0       204       156        93
VIS    2025250     91400   18.6500 -114.6600       9.0       204       156        90
VIS    2025250     91400   18.6600 -114.6800       9.3       203       159       100
VIS    2025250     91400   18.6500 -114.7800       6.9       211       170        99
VIS    2025250     91400   18.6600 -114.8100       6.3       210       175        99
VIS    2025250     91400   18.6600 -114.8500       5.6       228       178        99
VIS    2025250     91400   18.6700 -114.8700       5.4       223       181        99
VIS    2025250     91400   18.6700 -114.8800       5.3       223       183        98
VIS    2025250     91400   18.6700 -114.9500       9.3       221       181        96
VIS    2025250     91400   18.6600 -115.1000       5.2       196       181       100
VIS    2025250     91400   18.6600 -115.1000       5.2       193       181       100
VIS    2025250     91400   18.6500 -115.1400       5.3       192       185        97
VIS    2025250     91400   18.6400 -115.6300       4.6       167       179        99
VIS    2025250     91400   18.6400 -115.9900       7.0       189       186        96
VIS    2025250     91400   18.6200 -116.0000       7.1       192       184        98
VIS    2025250     91400   18.6200 -116.0500       9.3       189       180        98
VIS    2025250     91400   18.6200 -116.0700       9.4       188       180        97
VIS    2025250     91400   18.6200 -116.1000       6.7       196       183        97
VIS    2025250     91400   18.6300 -116.1400       6.1       200       186        94
VIS    2025250     91400   18.6300 -116.1400       6.1       199       186        95
VIS    2025250     91400   18.6300 -116.1900       7.6       178       184        96
VIS    2025250     91400   18.6200 -116.2200       4.5       175       181        97
VIS    2025250     91400   18.6300 -116.2300       4.8       175       181       100
VIS    2025250     91400   18.6000 -116.9800       7.9       197       170        99
VIS    2025250     91400   18.5800 -118.1400       4.9        51       177        99
VIS    2025250     91400   18.5700 -118.2800       5.9        49       171        98
VIS    2025250     91400   18.5600 -118.3700      11.3        11       159        98
VIS    2025250     91400   18.5500 -119.0600      11.1        35       164        99
VIS    2025250     91400   18.5500 -119.0700      11.0        36       164        99
VIS    2025250     91400   18.5600 -119.0900      10.1        45       169        99
VIS    2025250     91400   18.5500 -119.1200       9.1        52       174       100
VIS    2025250     91400   18.5500 -119.1800       9.6        43       175        95
VIS    2025250     91400   18.5400 -119.2200      11.4        50       178       100
VIS    2025250     91400   18.5400 -119.2300      11.5        50       178        99
VIS    2025250     91400   18.5500 -119.2700      11.4        16       178       100
VIS    2025250     91400   18.8400 -108.5400       6.8        33       185        92
VIS    2025250     91400   18.8400 -108.6300      12.4       107       182        95
VIS    2025250     91400   18.8200 -108.6900       7.8        51       185        95
VIS    2025250     91400   18.8100 -108.7600       7.6        84       171        98
VIS    2025250     91400   18.8200 -108.7700       7.7        85       168       100
VIS    2025250     91400   18.8200 -108.8200       6.8        92       157        98
VIS    2025250     91400   18.8100 -108.8300       6.1        88       156        97
VIS    2025250     91400   18.8200 -108.8900       5.4        83       164        98
VIS    2025250     91400   18.8200 -108.9400       7.6        68       167        99
VIS    2025250     91400   18.8000 -108.9800       7.9        70       167        93
VIS    2025250     91400   18.8100 -108.9800       7.7        68       167        90
VIS    2025250     91400   18.8200 -109.0700       7.7        47       184        90
VIS    2025250     91400   18.8200 -109.0800       7.4        46       186        91
VIS    2025250     91400   18.7700 -110.4000      12.8        91       128       100
VIS    2025250     91400   18.7800 -110.4400      12.1        89       126       100
VIS    2025250     91400   18.7700 -110.4500      12.0        88       125       100
VIS    2025250     91400   18.7700 -110.4900      11.7        86       119        98
VIS    2025250     91400   18.7600 -110.5300      11.2        87       117        99
VIS    2025250     91400   18.7700 -110.5400      10.5        88       119        99
VIS    2025250     91400   18.7500 -110.6000       9.0        91       129        97
VIS    2025250     91400   18.7700 -110.6200       8.7        92       147        99
VIS    2025250     91400   18.7700 -110.6300       8.8        94       147        99
VIS    2025250     91400   18.7600 -110.6600       9.4        96       152        95
VIS    2025250     91400   18.7300 -111.1600       9.6       100       158        99
VIS    2025250     91400   18.7500 -111.1900       9.7       100       154       100
VIS    2025250     91400   18.7400 -111.2000       9.6        99       153       100
VIS    2025250     91400   18.7400 -111.2300       8.7        97       155        99
VIS    2025250     91400   18.7300 -111.4200       9.5        96       128        98
VIS    2025250     91400   18.7200 -111.4600       9.1        77       132        94
VIS    2025250     91400   18.7400 -111.5500       9.9        87       141        90
VIS    2025250     91400   18.7400 -111.5800      13.0        89       151        93
VIS    2025250     91400   18.7200 -111.6900       7.6        67       146       100
VIS    2025250     91400   18.7200 -111.7200       7.9        75       144       100
VIS    2025250     91400   18.7300 -111.7600       8.3        77       145        99
VIS    2025250     91400   18.7300 -111.7600       8.3        78       144        98
VIS    2025250     91400   18.7200 -111.8000       8.4        77       142        99
VIS    2025250     91400   18.7200 -111.8400       6.2        75       141       100
VIS    2025250     91400   18.7100 -111.8600       5.5        67       147       100
VIS    2025250     91400   18.7300 -111.8900       6.1        72       150        97
VIS    2025250     91400   18.7100 -111.9100       6.2        73       158       100
VIS    2025250     91400   18.7300 -111.9400       6.4        72       164       100
VIS    2025250     91400   18.7200 -111.9900       7.5        80       166        97
VIS    2025250     91400   18.7200 -112.0900       6.8        81       160        93
VIS    2025250     91400   18.7200 -112.1200       7.4        85       160        99
VIS    2025250     91400   18.7000 -112.1600       7.4        89       152       100
VIS    2025250     91400   18.7000 -112.2000       6.3        90       151        95
VIS    2025250     91400   18.7100 -112.2200       5.6       100       152        99
VIS    2025250     91400   18.7100 -112.2600       6.2       103       158        99
VIS    2025250     91400   18.7200 -112.2600       6.3       103       158        98
VIS    2025250     91400   18.6900 -113.1900       6.9       140       147        98
VIS    2025250     91400   18.6900 -113.2100       6.7       135       147        99
VIS    2025250     91400   18.6800 -113.2400       6.4       129       145        99
VIS    2025250     91400   18.6700 -113.2800       6.1       124       139        98
VIS    2025250     91400   18.6800 -113.3000       6.1       131       139        95
VIS    2025250     91400   18.6800 -113.3400       4.9       162       141        97
VIS    2025250     91400   18.6700 -113.4000       8.0       166       142        97
VIS    2025250     91400   18.6700 -113.4100       8.1       162       142        97
VIS    2025250     91400   18.6600 -113.4300       7.9       163       140        96
VIS    2025250     91400   18.6800 -113.4700       8.1       171       136       100
VIS    2025250     91400   18.6800 -113.5100       7.6       167       132        98
VIS    2025250     91400   18.6700 -113.5300       6.3       164       131        95
VIS    2025250     91400   18.6700 -113.6300       6.3       191       133        92
VIS    2025250     91400   18.6800 -113.6900       9.1       178       141       100
VIS    2025250     91400   18.6600 -113.7200       7.9       173       141        99
VIS    2025250     91400   18.6700 -113.7600       7.9       169       149        97
VIS    2025250     91400   18.6500 -113.7800       8.5       172       150        99
VIS    2025250     91400   18.6500 -113.8200       9.2       176       155       100
VIS    2025250     91400   18.6700 -113.8400       8.3       176       149       100
VIS    2025250     91400   18.6600 -113.8800       8.1       169       149       100
VIS    2025250     91400   18.6500 -113.9000       8.0       165       150       100
VIS    2025250     91400   18.6500 -113.9400       8.6       167       158        99
VIS    2025250     91400   18.6500 -113.9500       8.5       168       158        99
VIS    2025250     91400   18.6500 -113.9800       9.2       170       160       100
VIS    2025250     91400   18.6600 -114.0500       6.5       158       157        97
VIS    2025250     91400   18.6500 -114.0900       8.0       159       156        99
VIS    2025250     91400   18.6500 -114.1000       7.8       158       157        99
VIS    2025250     91400   18.6400 -114.1400       7.8       163       153        96
VIS    2025250     91400   18.6600 -114.1700       5.5       173       151        97
VIS    2025250     91400   18.6500 -114.1800       6.2       169       149        99
VIS    2025250     91400   18.6400 -114.2200       6.8       171       146       100
VIS    2025250     91400   18.6400 -114.2600       7.4       171       145       100
VIS    2025250     91400   18.6400 -114.2700       7.6       171       146       100
VIS    2025250     91400   18.6500 -114.2900       7.9       173       146        99
VIS    2025250     91400   18.6600 -114.3200       8.2       178       146       100
VIS    2025250     91400   18.6400 -114.3500       6.8       190       141        98
VIS    2025250     91400   18.6400 -114.3900       8.4       194       140       100
VIS    2025250     91400   18.6400 -114.4200       8.4       195       142       100
VIS    2025250     91400   18.6500 -114.4500       9.3       194       146        96
VIS    2025250     91400   18.6300 -114.5700       8.8       215       155       100
VIS    2025250     91400   18.6500 -114.5900       8.7       217       155        93
VIS    2025250     91400   18.6500 -114.6000       8.8       217       155        92
VIS    2025250     91400   18.6300 -114.6500       9.4       214       155        96
VIS    2025250     91400   18.6400 -114.7100       9.5       214       161        95
VIS    2025250     91400   18.6400 -114.7800       6.3       211       170        95
VIS    2025250     91400   18.6400 -114.8500       5.2       222       181       100
VIS    2025250     91400   18.6300 -114.8700       5.5       213       181        97
VIS    2025250     91400   18.6400 -114.8800       5.7       217       181        91
VIS    2025250     91400   18.6100 -115.6400       4.0       165       184        94
VIS    2025250     91400   18.6100 -115.9900       6.6       193       185        97
VIS    2025250     91400   18.6000 -116.0500      11.2       187       176        99
VIS    2025250     91400   18.6100 -116.0700      10.4       188       180        97
VIS    2025250     91400   18.6000 -116.1100       6.5       200       184        97
VIS    2025250     91400   18.6000 -116.1200       6.2       204       184        97
VIS    2025250     91400   18.6100 -116.1500       5.7       208       187        96
VIS    2025250     91400   18.5400 -118.1000       5.0       124       180        98
VIS    2025250     91400   18.5400 -118.2800       5.5        43       170        97
VIS    2025250     91400   18.5500 -118.2900       6.1        42       166        92
VIS    2025250     91400   18.5400 -118.3400      10.2        20       159        90
VIS    2025250     91400   18.5400 -118.3700      12.0        10       164        99
VIS    2025250     91400   18.5300 -119.0400      11.0        30       164        94
VIS    2025250     91400   18.5100 -119.0600      10.9        33       162        97
VIS    2025250     91400   18.5300 -119.0800      10.9        38       163        99
VIS    2025250     91400   18.5200 -119.1000      11.0        41       162       100
VIS    2025250     91400   18.5300 -119.1300      10.3        43       170       100
VIS    2025250     91400   18.5300 -119.1500      10.7        43       170       100
VIS    2025250     91400   18.5100 -119.2000      12.4        47       172       100
VIS    2025250     91400   18.5200 -119.2300      11.2        50       177       100
VIS    2025250     91400   18.5100 -119.2500      11.2        49       177        99
VIS    2025250     91400   18.5100 -119.2600      11.3        50       178        99
VIS    2025250     91400   18.7900 -108.5200       6.6         2       187       100
VIS    2025250     91400   18.7900 -108.5400       6.6        12       185        99
VIS    2025250     91400   18.8000 -108.5500       5.6        24       183        99
VIS    2025250     91400   18.7900 -108.6500      10.0       103       180        90
VIS    2025250     91400   18.8100 -108.7300       7.4        75       180        92
VIS    2025250     91400   18.8100 -108.7600       7.5        83       171        97
VIS    2025250     91400   18.8100 -108.7700       7.6        84       168        99
VIS    2025250     91400   18.8000 -108.8200       6.3        64       160        92
VIS    2025250     91400   18.7900 -108.8400       6.1        63       160        95
VIS    2025250     91400   18.7700 -109.1300       6.2        75       189        90
VIS    2025250     91400   18.7400 -110.2200       7.7        27       155        98
VIS    2025250     91400   18.7400 -110.2500       7.2        38       154        99
VIS    2025250     91400   18.7400 -110.2800       8.4        95       153        99
VIS    2025250     91400   18.7300 -110.3900      12.6        88       131        96
VIS    2025250     91400   18.7500 -110.4100      12.6        90       126       100
VIS    2025250     91400   18.7500 -110.4400      12.4        89       126        99
VIS    2025250     91400   18.7500 -110.4800      12.2        87       121        99
VIS    2025250     91400   18.7500 -110.4800      12.1        87       121        99
VIS    2025250     91400   18.7500 -110.5200      11.6        87       117        99
VIS    2025250     91400   18.7500 -110.5400      10.7        88       119       100
VIS    2025250     91400   18.7300 -110.6000       8.8        87       127        98
VIS    2025250     91400   18.7300 -110.6300       8.4        87       139        98
VIS    2025250     91400   18.7500 -110.6400       8.8        93       148        99
VIS    2025250     91400   18.7300 -110.9700      10.8        88       156        97
VIS    2025250     91400   18.7200 -111.1500       9.9       100       158        99
VIS    2025250     91400   18.7300 -111.1800       9.8        99       154       100
VIS    2025250     91400   18.7100 -111.2100       9.3        95       153       100
VIS    2025250     91400   18.7100 -111.2400       8.7        90       153        96
VIS    2025250     91400   18.7300 -111.2700       8.1        93       155        96
VIS    2025250     91400   18.7000 -111.3200       9.3        97       148       100
VIS    2025250     91400   18.7000 -111.3500      10.2       108       144        96
VIS    2025250     91400   18.7200 -111.3900      11.6       117       132        97
VIS    2025250     91400   18.7200 -111.4100      10.2       103       132        98
VIS    2025250     91400   18.7200 -111.4600       9.1        77       132        95
VIS    2025250     91400   18.7000 -111.4800       9.2        75       137        98
VIS    2025250     91400   18.7000 -111.5300      10.3        82       148        98
VIS    2025250     91400   18.7000 -111.6200      13.0        89       153        97
VIS    2025250     91400   18.7000 -111.6700       5.9        58       151        94
VIS    2025250     91400   18.7000 -111.7100       7.5        71       144       100
VIS    2025250     91400   18.7100 -111.7200       8.0        75       144       100
VIS    2025250     91400   18.6900 -111.7600       8.1        78       143        98
VIS    2025250     91400   18.7100 -111.7700       8.5        77       143        97
VIS    2025250     91400   18.6900 -111.8200       7.2        68       142       100
VIS    2025250     91400   18.6900 -111.8500       5.5        62       147       100
VIS    2025250     91400   18.6900 -111.8600       5.4        63       147       100
VIS    2025250     91400   18.6900 -111.9100       6.0        70       158        97
VIS    2025250     91400   18.7000 -111.9200       6.0        77       159        99
VIS    2025250     91400   18.7000 -111.9900       7.6        79       166        99
VIS    2025250     91400   18.7000 -112.0100       7.7        79       168        97
VIS    2025250     91400   18.6800 -112.0900       6.9        78       166        99
VIS    2025250     91400   18.6900 -112.0900       7.0        81       162        97
VIS    2025250     91400   18.6800 -112.1500       7.4        92       157       100
VIS    2025250     91400   18.6900 -112.1500       7.4        90       154       100
VIS    2025250     91400   18.6900 -112.1900       6.6        86       152        97
VIS    2025250     91400   18.6900 -112.2400       6.7        98       159        96
VIS    2025250     91400   18.6900 -112.2700       7.0       107       163        97
VIS    2025250     91400   18.6600 -113.1000       7.1       163       153        94
VIS    2025250     91400   18.6500 -113.1200       7.6       165       152        97
VIS    2025250     91400   18.6700 -113.2200       5.6       133       147        93
VIS    2025250     91400   18.6700 -113.2300       5.2       132       147        99
VIS    2025250     91400   18.6600 -113.2900       6.1       123       139        98
VIS    2025250     91400   18.6500 -113.4000       7.4       158       138        98
VIS    2025250     91400   18.6500 -113.4300       8.0       162       140        97
VIS    2025250     91400   18.6500 -113.4600       8.3       166       138        97
VIS    2025250     91400   18.6500 -113.4600       8.3       167       138        98
VIS    2025250     91400   18.6500 -113.5000       8.5       168       135       100
VIS    2025250     91400   18.6300 -113.6900       8.4       185       142        99
VIS    2025250     91400   18.6500 -113.7300       7.7       175       142        98
VIS    2025250     91400   18.6400 -113.7500       8.7       172       144        98
VIS    2025250     91400   18.6400 -113.7800       8.9       174       156       100
VIS    2025250     91400   18.6500 -113.8300       9.3       176       155        99
VIS    2025250     91400   18.6300 -113.8600       8.9       172       152       100
VIS    2025250     91400   18.6300 -113.8700       8.7       171       152       100
VIS    2025250     91400   18.6500 -113.9000       8.0       165       150       100
VIS    2025250     91400   18.6200 -113.9400       7.3       170       158       100
VIS    2025250     91400   18.6300 -113.9700       8.8       170       158       100
VIS    2025250     91400   18.6400 -113.9800       9.2       170       160       100
VIS    2025250     91400   18.6300 -114.0300       6.9       171       154        93
VIS    2025250     91400   18.6200 -114.0600       8.3       165       155        99
VIS    2025250     91400   18.6200 -114.0700       8.3       165       155        99
VIS    2025250     91400   18.6300 -114.1200       8.5       165       155        99
VIS    2025250     91400   18.6300 -114.1200       8.3       164       153        99
VIS    2025250     91400   18.6200 -114.1700       8.2       165       146        99
VIS    2025250     91400   18.6200 -114.1800       7.8       165       145       100
VIS    2025250     91400   18.6300 -114.2200       7.1       170       145       100
VIS    2025250     91400   18.6300 -114.2600       7.5       171       145       100
VIS    2025250     91400   18.6300 -114.2700       7.5       171       145       100
VIS    2025250     91400   18.6200 -114.3100       7.0       179       145        99
VIS    2025250     91400   18.6300 -114.3300       6.5       185       144        98
VIS    2025250     91400   18.6200 -114.3700       7.8       189       140       100
VIS    2025250     91400   18.6200 -114.4000       8.2       192       140       100
VIS    2025250     91400   18.6300 -114.4100       8.2       195       141       100
VIS    2025250     91400   18.6100 -114.4400       7.4       200       142        99
VIS    2025250     91400   18.6100 -114.5600       4.2       184       152        98
VIS    2025250     91400   18.6200 -114.5800       8.7       219       155        99
VIS    2025250     91400   18.6200 -114.6100       8.9       219       155        95
VIS    2025250     91400   18.6200 -114.6600       9.2       219       155        99
VIS    2025250     91400   18.6100 -114.6600       9.0       222       155       100
VIS    2025250     91400   18.6100 -114.7100       8.5       233       158       100
VIS    2025250     91400   18.5900 -115.0000       4.7       231       184        97
VIS    2025250     91400   18.5700 -115.9800       6.9       204       186       100
VIS    2025250     91400   18.5800 -115.9900       6.6       204       186       100
VIS    2025250     91400   18.5700 -116.0600      12.7       183       174        92
VIS    2025250     91400   18.5700 -116.0700      13.1       183       175        98
VIS    2025250     91400   18.5700 -116.1400       5.4       241       182        94
VIS    2025250     91400   18.5800 -116.1600       5.0       224       184       100
VIS    2025250     91400   18.5200 -118.1000       5.5       129       180       100
VIS    2025250     91400   18.5200 -118.1000       5.3       126       180       100
VIS    2025250     91400   18.5300 -118.1300       4.9       122       178        98
VIS    2025250     91400   18.5100 -118.4000       6.8       354       172        94
VIS    2025250     91400   18.5000 -119.0600      10.8        34       161       100
VIS    2025250     91400   18.5100 -119.0900      11.3        41       159        99
VIS    2025250     91400   18.4900 -119.1100      11.9        43       158        98
VIS    2025250     91400   18.4900 -119.1500      12.1        40       158       100
VIS    2025250     91400   18.4900 -119.1800      12.7        42       161       100
VIS    2025250     91400   18.4900 -119.1800      12.8        43       163       100
VIS    2025250     91400   18.5000 -119.2400      11.4        49       176       100
VIS    2025250     91400   18.5000 -119.2800      11.3        48       177        99
VIS    2025250     91400   18.7700 -108.5100       9.6       359       187        97
VIS    2025250     91400   18.7900 -108.5400       7.4         7       186        98
VIS    2025250     91400   18.7800 -108.6900       8.7        88       177        90
VIS    2025250     91400   18.7800 -108.7200       8.0        82       176        90
VIS    2025250     91400   18.7700 -108.7700       7.4        60       169        99
VIS    2025250     91400   18.7600 -108.8000       8.0        53       168        99
VIS    2025250     91400   18.7600 -108.8400       7.4        54       166        93
VIS    2025250     91400   18.7700 -108.8400       7.1        55       166        93
VIS    2025250     91400   18.7300 -110.2100       8.2        25       156       100
VIS    2025250     91400   18.7200 -110.2500       8.4        23       155       100
VIS    2025250     91400   18.7100 -110.2900       8.7        92       153       100
VIS    2025250     91400   18.7100 -110.3200       9.1        98       156        96
VIS    2025250     91400   18.7100 -110.4300      12.5        87       131        92
VIS    2025250     91400   18.7200 -110.4400      12.5        88       126        96
VIS    2025250     91400   18.7300 -110.4600      12.4        87       125        97
VIS    2025250     91400   18.7200 -110.5100      11.7        87       117        98
VIS    2025250     91400   18.7000 -110.5200      11.2        85       119        99
VIS    2025250     91400   18.7200 -110.5500      10.3        86       119       100
VIS    2025250     91400   18.7100 -110.6000       8.9        84       127       100
VIS    2025250     91400   18.7000 -110.6200       8.6        83       131       100
VIS    2025250     91400   18.7100 -110.6400       8.5        86       139        99
VIS    2025250     91400   18.7000 -110.6800       9.3        90       149       100
VIS    2025250     91400   18.7000 -111.2000      10.2        97       153       100
VIS    2025250     91400   18.6900 -111.2200       9.4        91       154        99
VIS    2025250     91400   18.6900 -111.2400       9.1        90       153        93
VIS    2025250     91400   18.6900 -111.2900      10.4       100       149        96
VIS    2025250     91400   18.6800 -111.3100      10.0        99       148        99
VIS    2025250     91400   18.6800 -111.3600      10.0       103       141       100
VIS    2025250     91400   18.6900 -111.3700      10.9       108       141        99
VIS    2025250     91400   18.7000 -111.4100      12.2       120       134        96
VIS    2025250     91400   18.7000 -111.4200      12.2       119       133        95
VIS    2025250     91400   18.6800 -111.4600       9.2        78       138       100
VIS    2025250     91400   18.6900 -111.4800       9.2        76       138        99
VIS    2025250     91400   18.6800 -111.5300      10.4        78       148        99
VIS    2025250     91400   18.6900 -111.5400      10.6        84       148        93
VIS    2025250     91400   18.6700 -111.5800       9.3        70       153        99
VIS    2025250     91400   18.6700 -111.6500       6.1        61       153        97
VIS    2025250     91400   18.6700 -111.6800       6.3        62       152        99
VIS    2025250     91400   18.6700 -111.6900       6.3        63       151        98
VIS    2025250     91400   18.6700 -111.7300       7.8        75       140        96
VIS    2025250     91400   18.6800 -111.7600       7.5        79       140        91
VIS    2025250     91400   18.6800 -111.8300       6.7        64       143       100
VIS    2025250     91400   18.6800 -111.8600       5.8        58       148       100
VIS    2025250     91400   18.6800 -111.8600       5.6        59       148       100
VIS    2025250     91400   18.6600 -111.9800       4.7        92       169        94
VIS    2025250     91400   18.6700 -112.1000       6.9        82       162        98
VIS    2025250     91400   18.6700 -112.1500       7.4        90       155       100
VIS    2025250     91400   18.6600 -112.1600       7.5        87       154       100
VIS    2025250     91400   18.6700 -112.1900       7.6        73       151        97
VIS    2025250     91400   18.6300 -113.0400       5.9       134       158        97
VIS    2025250     91400   18.6200 -113.1200       6.1       168       155        94
VIS    2025250     91400   18.6200 -113.1900       4.8       132       144        93
VIS    2025250     91400   18.6200 -113.2300       4.7       139       141        93
VIS    2025250     91400   18.6200 -113.2500       5.0       135       139        96
VIS    2025250     91400   18.6200 -113.2900       6.3       135       137        93
VIS    2025250     91400   18.6300 -113.3000       6.4       128       137       100
VIS    2025250     91400   18.6400 -113.3400       6.7       160       137        95
VIS    2025250     91400   18.6200 -113.4400       8.2       154       135        99
VIS    2025250     91400   18.6200 -113.4400       8.2       155       136        98
VIS    2025250     91400   18.6200 -113.4800       8.2       164       133       100
VIS    2025250     91400   18.6300 -113.5000       9.0       169       133        99
VIS    2025250     91400   18.6200 -113.6900       9.0       189       141        95
VIS    2025250     91400   18.6100 -113.7100      10.2       192       141        92
VIS    2025250     91400   18.6200 -113.7500       9.2       175       143        99
VIS    2025250     91400   18.6200 -113.7800       8.9       174       150       100
VIS    2025250     91400   18.6000 -113.8100       7.9       177       155       100
VIS    2025250     91400   18.6000 -113.8400       8.3       176       155       100
VIS    2025250     91400   18.6000 -113.8600       8.3       175       157       100
VIS    2025250     91400   18.6000 -113.8800       8.5       171       160       100
VIS    2025250     91400   18.6200 -113.9000       7.8       167       152       100
VIS    2025250     91400   18.6100 -113.9400       7.1       170       157       100
VIS    2025250     91400   18.6200 -113.9700       7.9       170       158       100
VIS    2025250     91400   18.6100 -114.0300       7.6       170       157        98
VIS    2025250     91400   18.6000 -114.0700       8.2       170       154        96
VIS    2025250     91400   18.6000 -114.0700       8.3       170       154        96
VIS    2025250     91400   18.5900 -114.1200       9.1       166       150       100
VIS    2025250     91400   18.6000 -114.1300       9.4       166       150       100
VIS    2025250     91400   18.5900 -114.1600       9.3       166       146       100
VIS    2025250     91400   18.5900 -114.2100       7.4       168       143        99
VIS    2025250     91400   18.6100 -114.2300       7.3       170       144       100
VIS    2025250     91400   18.6100 -114.2600       7.2       171       145       100
VIS    2025250     91400   18.5900 -114.2800       7.2       172       144       100
VIS    2025250     91400   18.6000 -114.3200       6.6       182       143        99
VIS    2025250     91400   18.5900 -114.3500       7.4       188       142        99
VIS    2025250     91400   18.6000 -114.3600       7.5       187       142       100
VIS    2025250     91400   18.5900 -114.3900       7.2       193       142       100
VIS    2025250     91400   18.5900 -114.4200       6.9       196       142        99
VIS    2025250     91400   18.5900 -114.4400       6.7       198       142       100
VIS    2025250     91400   18.6000 -114.6000       8.1       226       155        90
VIS    2025250     91400   18.6000 -114.6200       8.5       223       155        94
VIS    2025250     91400   18.5800 -114.6500       8.7       221       155        98
VIS    2025250     91400   18.6000 -114.6800       8.5       228       157        98
VIS    2025250     91400   18.5900 -114.7100       7.5       240       160       100
VIS    2025250     91400   18.5800 -114.7300       7.5       242       161        98
VIS    2025250     91400   18.5800 -115.0000       4.8       226       182       100
VIS    2025250     91400   18.5600 -115.4300       5.7       197       180        93
VIS    2025250     91400   18.5600 -115.9900       5.2       215       183        99
VIS    2025250     91400   18.5500 -116.1500       5.3       245       182        97
VIS    2025250     91400   18.5600 -116.1600       4.8       237       182        90
VIS    2025250     91400   18.5200 -116.6800       4.6       230       167        99
VIS    2025250     91400   18.5200 -117.1800       4.9        60       183        94
VIS    2025250     91400   18.4900 -118.1100       5.1       123       180       100
VIS    2025250     91400   18.4800 -118.3700       7.0         7       171       100
VIS    2025250     91400   18.4800 -118.3900       6.8         2       171        97
VIS    2025250     91400   18.4900 -118.4100       6.5       359       171        92
VIS    2025250     91400   18.4800 -119.0500      11.1        27       169       100
VIS    2025250     91400   18.4600 -119.1000      11.8        42       156        98
VIS    2025250     91400   18.4800 -119.1100      12.0        41       156        98
VIS    2025250     91400   18.4600 -119.1300      12.2        36       154       100
VIS    2025250     91400   18.4700 -119.1700      12.7        39       159       100
VIS    2025250     91400   18.4800 -119.1800      13.0        43       161        99
VIS    2025250     91400   18.4700 -119.2900      11.0        41       175       100
VIS    2025250     91400   18.4700 -119.2900      11.0        42       175        99
VIS    2025250     91400   18.7600 -108.5200      11.1         1       186        95
VIS    2025250     91400   18.7500 -108.5400      10.1         9       183       100
VIS    2025250     91400   18.7400 -108.7700       9.2        46       168        97
VIS    2025250     91400   18.7400 -108.8000       8.9        57       168        97
VIS    2025250     91400   18.7500 -108.8200       8.2        55       166        98
VIS    2025250     91400   18.6900 -110.2100       6.5        10       161        97
VIS    2025250     91400   18.6900 -110.2600       8.2        79       153        93
VIS    2025250     91400   18.6900 -110.3000       8.5        83       154        99
VIS    2025250     91400   18.7100 -110.3100       8.4        92       156        99
VIS    2025250     91400   18.6800 -110.3700      10.4        26       155        99
VIS    2025250     91400   18.6900 -110.4400      12.3        85       135        99
VIS    2025250     91400   18.6800 -110.4900      12.2        84       125       100
VIS    2025250     91400   18.6800 -110.5100      12.0        83       123       100
VIS    2025250     91400   18.6800 -110.5500      10.1        82       120        94
VIS    2025250     91400   18.6800 -110.5700       9.8        80       123        97
VIS    2025250     91400   18.7000 -110.5900       8.8        84       127       100
VIS    2025250     91400   18.7000 -110.6200       8.7        83       131       100
VIS    2025250     91400   18.6900 -110.6600       9.1        83       141       100
VIS    2025250     91400   18.6700 -110.6900       9.7        88       149        99
VIS    2025250     91400   18.6800 -111.1000       6.3        78       157        93
VIS    2025250     91400   18.6600 -111.1400       7.8        79       153        99
VIS    2025250     91400   18.6700 -111.2800      12.1       106       148        98
VIS    2025250     91400   18.6700 -111.3200      10.2       100       148        96
VIS    2025250     91400   18.6500 -111.3600       9.5        98       137       100
VIS    2025250     91400   18.6600 -111.3900      11.9       101       137       100
VIS    2025250     91400   18.6700 -111.3900      12.6       105       138        99
VIS    2025250     91400   18.6700 -111.4200      13.9       101       138       100
VIS    2025250     91400   18.6500 -111.4800       8.8        90       146        97
VIS    2025250     91400   18.6600 -111.4900       9.0        82       144       100
VIS    2025250     91400   18.6500 -111.5400       9.6        79       148        99
VIS    2025250     91400   18.6600 -111.5700       9.2        72       152        98
VIS    2025250     91400   18.6600 -111.5700       9.0        70       153        99
VIS    2025250     91400   18.6600 -111.6800       6.6        64       152       100
VIS    2025250     91400   18.6600 -111.6900       6.7        66       152       100
VIS    2025250     91400   18.6600 -111.7600       7.4        76       140        91
VIS    2025250     91400   18.6400 -112.0200       4.7       111       169        97
VIS    2025250     91400   18.6300 -112.1300       7.9        96       158        99
VIS    2025250     91400   18.6300 -112.1600       7.9        88       156        95
VIS    2025250     91400   18.6500 -112.1600       7.6        87       156        99
VIS    2025250     91400   18.6400 -112.2000       7.7        78       154       100
VIS    2025250     91400   18.6200 -112.5600       4.7        58       168        94
VIS    2025250     91400   18.6100 -112.8000       4.1       125       160        97
VIS    2025250     91400   18.6200 -112.8100       4.0       124       160       100
VIS    2025250     91400   18.6200 -113.0600       5.7       135       158       100
VIS    2025250     91400   18.6200 -113.0700       5.7       135       158       100
VIS    2025250     91400   18.6100 -113.1200       5.7       169       155        92
VIS    2025250     91400   18.6100 -113.2500       5.2       137       139        95
VIS    2025250     91400   18.6000 -113.3000       6.9       133       135        91
VIS    2025250     91400   18.6100 -113.3100       7.1       142       135       100
VIS    2025250     91400   18.6100 -113.3300       7.2       156       135        99
VIS    2025250     91400   18.6100 -113.3700       7.5       162       135        91
VIS    2025250     91400   18.6100 -113.4100       8.3       155       135        94
VIS    2025250     91400   18.5900 -113.4700       8.0       160       130       100
VIS    2025250     91400   18.6000 -113.4800       7.9       163       131       100
VIS    2025250     91400   18.6000 -113.5000       8.2       166       131       100
VIS    2025250     91400   18.5900 -113.7700       9.0       178       143        90
VIS    2025250     91400   18.6000 -113.8100       7.8       177       155       100
VIS    2025250     91400   18.5800 -113.8300       7.5       178       152       100
VIS    2025250     91400   18.5800 -113.8700       7.7       175       161       100
VIS    2025250     91400   18.6000 -113.9000       8.1       171       160       100
VIS    2025250     91400   18.5700 -113.9300       6.7       174       157       100
VIS    2025250     91400   18.5800 -113.9500       6.0       171       155        98
VIS    2025250     91400   18.5900 -113.9600       5.7       165       157        96
VIS    2025250     91400   18.5900 -114.0100       8.2       166       164        95
VIS    2025250     91400   18.5900 -114.0300       8.3       171       163        99
VIS    2025250     91400   18.5900 -114.0700       8.3       171       154        96
VIS    2025250     91400   18.5900 -114.1000       8.2       170       153        98
VIS    2025250     91400   18.5800 -114.1000       8.1       168       153        99
VIS    2025250     91400   18.5700 -114.1500       9.0       167       147       100
VIS    2025250     91400   18.5700 -114.1700       8.6       167       145       100
VIS    2025250     91400   18.5700 -114.2000       7.8       169       145        99
VIS    2025250     91400   18.5700 -114.2300       7.5       171       143       100
VIS    2025250     91400   18.5700 -114.2700       7.7       180       145       100
VIS    2025250     91400   18.5600 -114.2900       6.7       188       141        97
VIS    2025250     91400   18.5800 -114.3100       6.4       190       142        97
VIS    2025250     91400   18.5700 -114.3300       7.0       193       142        93
VIS    2025250     91400   18.5700 -114.3600       7.5       195       143        98
VIS    2025250     91400   18.5800 -114.3900       7.0       196       142        99
VIS    2025250     91400   18.5800 -114.4300       6.6       196       142       100
VIS    2025250     91400   18.5800 -114.4500       6.7       196       142       100
VIS    2025250     91400   18.5800 -114.6100       8.5       230       155        95
VIS    2025250     91400   18.5700 -114.6400       9.0       221       155        98
VIS    2025250     91400   18.5700 -114.6400       8.8       221       155        97
VIS    2025250     91400   18.5700 -114.6800       6.8       226       158        98
VIS    2025250     91400   18.5600 -114.7000       6.5       231       159       100
VIS    2025250     91400   18.5400 -115.4500       6.4       199       179       100
VIS    2025250     91400   18.5400 -115.4800       6.6       191       179        98
VIS    2025250     91400   18.5400 -115.5100       7.0       170       179        94
VIS    2025250     91400   18.5200 -116.0500       5.5       187       177       100
VIS    2025250     91400   18.5200 -116.6500       4.3       254       168       100
VIS    2025250     91400   18.5100 -116.6700       4.5       242       167        92
VIS    2025250     91400   18.5100 -116.6900       4.3       231       167        93
VIS    2025250     91400   18.5000 -117.1700       4.2        58       181        94
VIS    2025250     91400   18.4800 -118.0900       5.2       131       187        92
VIS    2025250     91400   18.4800 -118.1100       7.7       140       180        93
VIS    2025250     91400   18.4600 -118.1600       4.0        27       178        92
VIS    2025250     91400   18.4600 -118.3100      10.4        29       175       100
VIS    2025250     91400   18.4600 -118.3400       9.8        22       171       100
VIS    2025250     91400   18.4700 -118.3600       8.4        13       171        99
VIS    2025250     91400   18.4700 -118.3900       7.2         2       171        96
VIS    2025250     91400   18.4500 -119.0700      12.5        13       179        96
VIS    2025250     91400   18.4600 -119.1000      12.0        38       156        90
VIS    2025250     91400   18.4400 -119.1100      12.0        33       156        94
VIS    2025250     91400   18.4600 -119.1400      12.4        33       154        99
VIS    2025250     91400   18.4500 -119.1800      12.7        40       159       100
VIS    2025250     91400   18.7400 -108.4700       8.1       348       187        93
VIS    2025250     91400   18.7200 -108.6400       8.8       103       162        91
VIS    2025250     91400   18.7100 -108.7200       7.8        94       163        95
VIS    2025250     91400   18.7300 -108.7700       9.5        44       166        97
VIS    2025250     91400   18.7200 -108.8200       8.4        71       165        99
VIS    2025250     91400   18.6700 -110.2300       6.5        10       160        99
VIS    2025250     91400   18.6700 -110.2600       8.3        76       148       100
VIS    2025250     91400   18.6600 -110.2800       8.4        69       151       100
VIS    2025250     91400   18.6600 -110.3100       8.3        73       159        97
VIS    2025250     91400   18.6700 -110.3200       8.1        79       160        97
VIS    2025250     91400   18.6700 -110.4100      12.3        29       153        95
VIS    2025250     91400   18.6700 -110.4100      12.4        31       152        96
VIS    2025250     91400   18.6800 -110.4400      12.1        83       136        99
VIS    2025250     91400   18.6700 -110.5000      12.2        83       124       100
VIS    2025250     91400   18.6700 -110.5100      11.9        82       123       100
VIS    2025250     91400   18.6500 -110.5400      10.6        78       123        93
VIS    2025250     91400   18.6600 -110.5900      10.6        76       126        99
VIS    2025250     91400   18.6700 -110.6000       9.9        78       127       100
VIS    2025250     91400   18.6600 -110.6200       9.7        78       129       100
VIS    2025250     91400   18.6600 -110.6500       9.4        83       137        99
VIS    2025250     91400   18.6500 -110.6900       9.9        89       151        96
VIS    2025250     91400   18.6400 -111.1500       8.0        80       151        98
VIS    2025250     91400   18.6300 -111.1800       8.3        82       140        99
VIS    2025250     91400   18.6500 -111.3000      13.1       106       141        99
VIS    2025250     91400   18.6400 -111.3400       9.9        98       138        99
VIS    2025250     91400   18.6300 -111.3700       8.6        96       135        97
VIS    2025250     91400   18.6400 -111.3800      11.0        96       135        98
VIS    2025250     91400   18.6300 -111.4100      13.4        94       135        98
VIS    2025250     91400   18.6300 -111.4600       9.1        92       142        96
VIS    2025250     91400   18.6300 -111.4600       9.0        91       144        97
VIS    2025250     91400   18.6300 -111.5100       8.8        87       148        98
VIS    2025250     91400   18.6300 -111.5200       8.5        84       148        99
VIS    2025250     91400   18.6400 -111.5700       8.8        71       152        99
VIS    2025250     91400   18.6200 -111.5800       7.9        71       152       100
VIS    2025250     91400   18.6200 -111.6100       7.7        73       153       100
VIS    2025250     91400   18.6300 -111.7000       8.5        72       152        93
VIS    2025250     91400   18.6300 -111.8700       4.3       101       155        94
VIS    2025250     91400   18.6300 -111.8700       4.2       100       156        92
VIS    2025250     91400   18.6100 -112.0700       6.5        97       167        93
VIS    2025250     91400   18.6200 -112.1600       7.8        88       156        95
VIS    2025250     91400   18.6100 -112.1800       7.9        87       157        97
VIS    2025250     91400   18.5900 -112.6200       4.7        68       163        98
VIS    2025250     91400   18.5800 -112.8000       4.9       132       160       100
VIS    2025250     91400   18.6000 -112.8100       4.3       126       160        97
VIS    2025250     91400   18.5800 -113.0500       4.7       110       161       100
VIS    2025250     91400   18.5800 -113.1400       4.6       146       154       100
VIS    2025250     91400   18.5700 -113.1900       5.3       145       146        94
VIS    2025250     91400   18.5800 -113.2100       5.7       129       142        92
VIS    2025250     91400   18.5700 -113.2800       7.4       132       132        96
VIS    2025250     91400   18.5800 -113.3200       7.0       137       133        96
VIS    2025250     91400   18.5700 -113.3600       6.7       144       131        97
VIS    2025250     91400   18.5800 -113.3700       7.5       151       131        95
VIS    2025250     91400   18.5600 -113.4500       8.4       153       130        98
VIS    2025250     91400   18.5700 -113.4600       8.4       156       130       100
VIS    2025250     91400   18.5700 -113.4800       8.4       162       130       100
VIS    2025250     91400   18.5500 -113.7900       5.5       183       139        95
VIS    2025250     91400   18.5600 -113.8000       5.8       182       140        98
VIS    2025250     91400   18.5500 -113.8300       6.3       180       143       100
VIS    2025250     91400   18.5700 -113.8700       7.6       175       161       100
VIS    2025250     91400   18.5700 -113.8800       7.6       174       161       100
VIS    2025250     91400   18.5500 -113.9300       6.8       173       153       100
VIS    2025250     91400   18.5500 -113.9400       6.6       173       153       100
VIS    2025250     91400   18.5600 -113.9900       7.3       164       151        92
VIS    2025250     91400   18.5600 -113.9900       7.6       163       159        92
VIS    2025250     91400   18.5500 -114.0400       8.1       174       159       100
VIS    2025250     91400   18.5600 -114.0600       8.4       176       161       100
VIS    2025250     91400   18.5600 -114.1000       7.9       175       151        98
VIS    2025250     91400   18.5600 -114.1100       7.8       173       151        99
VIS    2025250     91400   18.5500 -114.1500       8.2       169       142       100
VIS    2025250     91400   18.5400 -114.1900       8.2       170       142        99
VIS    2025250     91400   18.5400 -114.2000       7.8       172       145       100
VIS    2025250     91400   18.5500 -114.2400       7.8       175       145       100
VIS    2025250     91400   18.5400 -114.2700       7.7       185       145       100
VIS    2025250     91400   18.5400 -114.2800       7.5       186       142       100
VIS    2025250     91400   18.5400 -114.3300       7.3       194       143        97
VIS    2025250     91400   18.5400 -114.3400       7.3       196       142        97
VIS    2025250     91400   18.5500 -114.3800       7.0       200       142        97
VIS    2025250     91400   18.5400 -114.4000       6.8       199       142        92
VIS    2025250     91400   18.5400 -114.4300       6.8       199       142       100
VIS    2025250     91400   18.5500 -114.4600       6.8       192       143        95
VIS    2025250     91400   18.5500 -114.6100       8.4       229       155        96
VIS    2025250     91400   18.5300 -114.7100       5.7       226       158       100
VIS    2025250     91400   18.5300 -114.8900       7.7       319       179        92
VIS    2025250     91400   18.5200 -114.9200       7.3       317       179        93
VIS    2025250     91400   18.5300 -114.9400       4.5       242       178        95
VIS    2025250     91400   18.5200 -114.9800       4.6       228       176       100
VIS    2025250     91400   18.5200 -115.0000       4.5       229       175       100
VIS    2025250     91400   18.5300 -115.0400       5.1       219       179       100
VIS    2025250     91400   18.5400 -115.0400       5.3       216       182        99
VIS    2025250     91400   18.5300 -115.4500       6.2       198       180       100
VIS    2025250     91400   18.5100 -115.4800       6.6       193       181       100
VIS    2025250     91400   18.5000 -115.8800       4.4       174       183        97
VIS    2025250     91400   18.5100 -115.8900       4.7       175       189        99
VIS    2025250     91400   18.5000 -115.9400       4.2       180       184        90
VIS    2025250     91400   18.5100 -116.0500       5.7       190       177        98
VIS    2025250     91400   18.5100 -116.0800       4.8       201       177       100
VIS    2025250     91400   18.5000 -116.4300       6.2        61       172        93
VIS    2025250     91400   18.4900 -116.4600       7.6        59       171        92
VIS    2025250     91400   18.4500 -118.0800       5.4       148       185        95
VIS    2025250     91400   18.4400 -118.0900       5.2       151       185        99
VIS    2025250     91400   18.4400 -118.3100      10.0        30       176        92
VIS    2025250     91400   18.4400 -118.3500       8.8        14       176       100
VIS    2025250     91400   18.4500 -118.3600       9.1        10       171       100
VIS    2025250     91400   18.4500 -118.3800       8.5         4       171        99
VIS    2025250     91400   18.4300 -118.4700      11.3        34       186       100
VIS    2025250     91400   18.4200 -119.0700      13.2         6       179        95
VIS    2025250     91400   18.4300 -119.0900      13.2         7       179       100
VIS    2025250     91400   18.4200 -119.1300      11.9        26       158       100
VIS    2025250     91400   18.4300 -119.1600      12.8        28       157        98
VIS    2025250     91400   18.4300 -119.1900      12.9        36       159        99
VIS    2025250     91400   18.7100 -108.6200       8.5        95       162        94
VIS    2025250     91400   18.6900 -108.6500       9.4       105       159        98
VIS    2025250     91400   18.7100 -108.7800       8.8        38       169        90
VIS    2025250     91400   18.6500 -110.2700       8.5        72       147       100
VIS    2025250     91400   18.6400 -110.3100       8.5        77       153        99
VIS    2025250     91400   18.6400 -110.4100      11.5        34       151       100
VIS    2025250     91400   18.6300 -110.4200      11.4        36       151       100
VIS    2025250     91400   18.6400 -110.4500      10.5        45       139        93
VIS    2025250     91400   18.6400 -110.5000      11.4        76       127        99
VIS    2025250     91400   18.6300 -110.5100      11.1        76       125       100
VIS    2025250     91400   18.6400 -110.5500      10.5        76       123        93
VIS    2025250     91400   18.6400 -110.5800      11.0        75       124        96
VIS    2025250     91400   18.6500 -110.6200      10.4        75       126       100
VIS    2025250     91400   18.6400 -110.6500       9.2        83       135        90
VIS    2025250     91400   18.6300 -110.6800       9.7        90       141        99
VIS    2025250     91400   18.6200 -110.7000      10.0        92       151       100
VIS    2025250     91400   18.6100 -111.0100      13.6        98       146       100
VIS    2025250     91400   18.6200 -111.0300      13.4        97       150       100
VIS    2025250     91400   18.6100 -111.1600       8.2        75       150        98
VIS    2025250     91400   18.6200 -111.2500      14.1       102       135       100
VIS    2025250     91400   18.6200 -111.2600      14.1       102       136        99
VIS    2025250     91400   18.6000 -111.3100      11.1        92       129        98
VIS    2025250     91400   18.6100 -111.3200      11.2        91       129        97
VIS    2025250     91400   18.6100 -111.5900       7.8        72       152       100
VIS    2025250     91400   18.6100 -111.6200       7.4        73       153       100
VIS    2025250     91400   18.6000 -111.6400       6.5        72       151        93
VIS    2025250     91400   18.6000 -111.8600       5.2       105       144        99
VIS    2025250     91400   18.5800 -112.0500       6.3        99       168        99
VIS    2025250     91400   18.6000 -112.0600       6.6        98       167        96
VIS    2025250     91400   18.5800 -112.1400       7.0        79       166        97
VIS    2025250     91400   18.6000 -112.1700       7.4        93       159        96
VIS    2025250     91400   18.6000 -112.1700       7.8        90       159        93
VIS    2025250     91400   18.6000 -112.2000       5.4       121       169        93
VIS    2025250     91400   18.5700 -112.4500       7.7        66       164        98
VIS    2025250     91400   18.5900 -112.5500       4.9        53       163       100
VIS    2025250     91400   18.5600 -112.6000       5.4        78       163        94
VIS    2025250     91400   18.5800 -112.6200       4.8        73       163        96
VIS    2025250     91400   18.5600 -112.8600       4.5       147       159        98
VIS    2025250     91400   18.5500 -113.0700       4.1       136       161        99
VIS    2025250     91400   18.5600 -113.1400       4.4       135       153       100
VIS    2025250     91400   18.5600 -113.1900       5.1       139       148        98
VIS    2025250     91400   18.5600 -113.1900       5.2       141       146        96
VIS    2025250     91400   18.5400 -113.3700       7.3       142       129        90
VIS    2025250     91400   18.5500 -113.4000       8.1       144       128        99
VIS    2025250     91400   18.5500 -113.4400       8.7       149       129        98
VIS    2025250     91400   18.5400 -113.7000       4.3       114       132        91
VIS    2025250     91400   18.5400 -113.8100       5.3       183       139        98
VIS    2025250     91400   18.5300 -113.8500       6.4       182       142        99
VIS    2025250     91400   18.5500 -113.8600       6.8       178       146       100
VIS    2025250     91400   18.5300 -113.9000       6.5       171       147       100
VIS    2025250     91400   18.5200 -113.9300       6.8       169       152       100
VIS    2025250     91400   18.5200 -113.9600       6.9       168       143       100
VIS    2025250     91400   18.5200 -113.9900       6.7       166       141        99
VIS    2025250     91400   18.5400 -114.0100       7.6       167       151        99
VIS    2025250     91400   18.5300 -114.0500       7.9       176       157       100
VIS    2025250     91400   18.5200 -114.0600       7.9       176       154       100
VIS    2025250     91400   18.5200 -114.1100       8.1       173       144       100
VIS    2025250     91400   18.5200 -114.1200       8.0       171       142       100
VIS    2025250     91400   18.5200 -114.1500       8.4       169       139       100
VIS    2025250     91400   18.5400 -114.1900       8.0       172       142       100
VIS    2025250     91400   18.5200 -114.2200       7.6       178       146       100
VIS    2025250     91400   18.5300 -114.2300       7.6       178       146       100
VIS    2025250     91400   18.5400 -114.2700       7.9       185       145       100
VIS    2025250     91400   18.5200 -114.3100       8.1       185       145       100
VIS    2025250     91400   18.5200 -114.3200       8.1       186       145       100
VIS    2025250     91400   18.5100 -114.3600       8.1       196       145       100
VIS    2025250     91400   18.5200 -114.3700       7.6       195       145        96
VIS    2025250     91400   18.5200 -114.4100       6.8       198       140        93
VIS    2025250     91400   18.5200 -114.4400       6.1       205       140        99
VIS    2025250     91400   18.5100 -114.5500       5.4       234       152        92
VIS    2025250     91400   18.5100 -114.7000       6.1       225       157        90
VIS    2025250     91400   18.5200 -114.7200       5.6       225       159       100
VIS    2025250     91400   18.5000 -114.7500       4.5       243       166        95
VIS    2025250     91400   18.5200 -114.9000       7.5       317       180        97
VIS    2025250     91400   18.5100 -114.9600       4.9       233       177        97
VIS    2025250     91400   18.5000 -114.9800       4.4       238       176        98
VIS    2025250     91400   18.5100 -115.0200       4.7       226       178       100
VIS    2025250     91400   18.4800 -116.1100       4.1       215       177        97
VIS    2025250     91400   18.4600 -116.4400       4.2        43       165        95
VIS    2025250     91400   18.4600 -116.4500       4.0        54       165        99
VIS    2025250     91400   18.4500 -117.1000       5.6        36       178        90
VIS    2025250     91400   18.4300 -118.0800       4.7       153       185        99
VIS    2025250     91400   18.4100 -118.2400       4.2        36       183        97
VIS    2025250     91400   18.4300 -118.3100       9.8        38       176       100
VIS    2025250     91400   18.4300 -118.3500       8.4        16       176        99
VIS    2025250     91400   18.4300 -118.3600       8.1         9       178        97
VIS    2025250     91400   18.4200 -118.3900       8.3         9       178       100
VIS    2025250     91400   18.4000 -119.0500      15.4        10       182        96
VIS    2025250     91400   18.3900 -119.0800      15.9         7       181       100
VIS    2025250     91400   18.4000 -119.1300      13.0        12       162       100
VIS    2025250     91400   18.4100 -119.1600      13.4        19       160       100
VIS    2025250     91400   18.4000 -119.1800      13.9        19       160       100
VIS    2025250     91400   18.6700 -108.6100       8.1        86       160        93
VIS    2025250     91400   18.6700 -108.6400       8.8       101       158        97
VIS    2025250     91400   18.6600 -108.6900       6.4        66       160       100
VIS    2025250     91400   18.6800 -108.7100       5.3        68       160        97
VIS    2025250     91400   18.6300 -110.4500      11.1        43       142       100
VIS    2025250     91400   18.6100 -110.4600      10.9        49       139       100
VIS    2025250     91400   18.6200 -110.5100      10.2        69       126       100
VIS    2025250     91400   18.6200 -110.5100      10.3        73       125       100
VIS    2025250     91400   18.6100 -110.5600      10.1        73       124        90
VIS    2025250     91400   18.6200 -110.5900      11.3        75       124        95
VIS    2025250     91400   18.6000 -110.6300      12.1        75       127        99
VIS    2025250     91400   18.6200 -110.6600       8.9        81       133        99
VIS    2025250     91400   18.6100 -110.6800       8.3        84       137       100
VIS    2025250     91400   18.6200 -110.7100      10.2        94       155       100
VIS    2025250     91400   18.6000 -110.7400      11.5       101       157       100
VIS    2025250     91400   18.6100 -111.0200      13.4        97       146       100
VIS    2025250     91400   18.5900 -111.0300      13.4        98       143       100
VIS    2025250     91400   18.6100 -111.0500      13.4        95       150       100
VIS    2025250     91400   18.5800 -111.1100      11.1        87       154        99
VIS    2025250     91400   18.6000 -111.1300       9.9        91       152        99
VIS    2025250     91400   18.5800 -111.1700      10.3        97       141        92
VIS    2025250     91400   18.5900 -111.2100      12.7        99       136        99
VIS    2025250     91400   18.5800 -111.2500      13.8        98       132       100
VIS    2025250     91400   18.5800 -111.2800      13.0        96       132        95
VIS    2025250     91400   18.5900 -111.3200      10.9        95       129       100
VIS    2025250     91400   18.5900 -111.3300      11.3        95       129        99
VIS    2025250     91400   18.5800 -111.4900       9.9        76       138        98
VIS    2025250     91400   18.5800 -111.6300       7.1        87       147        97
VIS    2025250     91400   18.5800 -111.6500       6.6        82       147        98
VIS    2025250     91400   18.5700 -111.8000       8.6        76       136        97
VIS    2025250     91400   18.5800 -112.0600       6.5        97       168       100
VIS    2025250     91400   18.5800 -112.0600       6.9        94       168        98
VIS    2025250     91400   18.5600 -112.1300       6.4        74       166       100
VIS    2025250     91400   18.5600 -112.1600       6.5        90       166        98
VIS    2025250     91400   18.5500 -112.4400       7.2        62       162        99
VIS    2025250     91400   18.5500 -112.4600       7.8        56       164        94
VIS    2025250     91400   18.5600 -112.4700       8.6        61       164        97
VIS    2025250     91400   18.5600 -112.5400       5.0        46       163       100
VIS    2025250     91400   18.5400 -112.8200       5.6       154       152        94
VIS    2025250     91400   18.5300 -112.8400       5.7       158       152        99
VIS    2025250     91400   18.5300 -112.8700       5.8       153       147        90
VIS    2025250     91400   18.5500 -112.9000       6.8       128       150       100
VIS    2025250     91400   18.5300 -113.0300       4.0       153       166        93
VIS    2025250     91400   18.5200 -113.0700       4.7       158       168        99
VIS    2025250     91400   18.5400 -113.1800       5.0       130       153        99
VIS    2025250     91400   18.5300 -113.3700       7.9       146       129        96
VIS    2025250     91400   18.5300 -113.4200       8.4       144       125       100
VIS    2025250     91400   18.5100 -113.4600       8.4       145       120        94
VIS    2025250     91400   18.5200 -113.4600       8.3       145       120        93
VIS    2025250     91400   18.5100 -113.5700       4.7       165       132        95
VIS    2025250     91400   18.5200 -113.8400       5.5       183       135        99
VIS    2025250     91400   18.5100 -113.8900       5.7       176       143       100
VIS    2025250     91400   18.5000 -113.9000       5.3       172       142       100
VIS    2025250     91400   18.5000 -113.9300       5.9       168       142       100
VIS    2025250     91400   18.5100 -113.9700       6.9       166       142       100
VIS    2025250     91400   18.5000 -113.9800       6.6       163       143       100
VIS    2025250     91400   18.5000 -114.0200       6.4       165       152        96
VIS    2025250     91400   18.5200 -114.0600       7.6       176       154       100
VIS    2025250     91400   18.5000 -114.0600       7.4       175       148       100
VIS    2025250     91400   18.5100 -114.1000       8.1       173       144       100
VIS    2025250     91400   18.4900 -114.1300       8.1       171       142       100
VIS    2025250     91400   18.5100 -114.1500       8.3       169       140       100
VIS    2025250     91400   18.5100 -114.2000       7.8       175       146       100
VIS    2025250     91400   18.4900 -114.2200       7.5       181       146       100
VIS    2025250     91400   18.5000 -114.2600       7.6       183       143       100
VIS    2025250     91400   18.4900 -114.2800       8.2       184       140        99
VIS    2025250     91400   18.4900 -114.3000       7.9       184       146        99
VIS    2025250     91400   18.5100 -114.3200       8.1       186       146       100
VIS    2025250     91400   18.4900 -114.3600       7.5       198       146       100
VIS    2025250     91400   18.4900 -114.4400       5.8       204       142       100
VIS    2025250     91400   18.5000 -114.4600       5.3       206       142       100
VIS    2025250     91400   18.4900 -114.5300       5.6       226       154        99
VIS    2025250     91400   18.5000 -114.5500       5.6       237       154        92
VIS    2025250     91400   18.4900 -114.5800       6.2       241       158        96
VIS    2025250     91400   18.4900 -114.7100       5.2       223       164        95
VIS    2025250     91400   18.5000 -114.7400       4.5       240       166        99
VIS    2025250     91400   18.4800 -114.8900       8.5       286       182        96
VIS    2025250     91400   18.4700 -114.9700       5.5       230       176        99
VIS    2025250     91400   18.4800 -115.0500       4.5       236       177        98
VIS    2025250     91400   18.4500 -116.0200       7.1       184       179        94
VIS    2025250     91400   18.4100 -117.1000       5.4        23       177        94
VIS    2025250     91400   18.4200 -117.1200       5.2        33       178       100
VIS    2025250     91400   18.4300 -117.1400       5.5        36       182        97
VIS    2025250     91400   18.3900 -118.2500       4.5        25       181        98
VIS    2025250     91400   18.3800 -118.2700       4.8        23       179        99
VIS    2025250     91400   18.3900 -118.3200       7.7        28       184        98
VIS    2025250     91400   18.4000 -118.3500       7.4         7       183        97
VIS    2025250     91400   18.3700 -119.0600      15.3         7       181        97
VIS    2025250     91400   18.3700 -119.0700      15.4         7       181        98
VIS    2025250     91400   18.3700 -119.1400      13.3        12       166       100
VIS    2025250     91400   18.3800 -119.1500      13.5        13       162       100
VIS    2025250     91400   18.6500 -108.5900       8.9        85       160        98
VIS    2025250     91400   18.6500 -108.5900       8.9        85       158        97
VIS    2025250     91400   18.6500 -108.6700       7.7        70       159       100
VIS    2025250     91400   18.6600 -108.7000       5.8        61       160        99
VIS    2025250     91400   18.5900 -110.4600      10.2        55       151       100
VIS    2025250     91400   18.6000 -110.4600      10.9        52       139       100
VIS    2025250     91400   18.6000 -110.4900      10.8        57       139        94
VIS    2025250     91400   18.6000 -110.5700      10.6        74       124        94
VIS    2025250     91400   18.5800 -110.5800      10.4        78       124        99
VIS    2025250     91400   18.5800 -110.6200      11.3        78       125        99
VIS    2025250     91400   18.5900 -110.6900       9.0        93       139        99
VIS    2025250     91400   18.5700 -110.7200       9.5        95       139        96
VIS    2025250     91400   18.5900 -110.7500      12.2       103       161        99
VIS    2025250     91400   18.5900 -110.7600      12.0       103       162        98
VIS    2025250     91400   18.5700 -111.0000      13.5       100       141       100
VIS    2025250     91400   18.5600 -111.0000      13.4       100       141       100
VIS    2025250     91400   18.5800 -111.0400      13.3        97       143       100
VIS    2025250     91400   18.5600 -111.0800      12.9        93       155        99
VIS    2025250     91400   18.5600 -111.1200      11.9        88       154        99
VIS    2025250     91400   18.5600 -111.1200      11.8        89       154        99
VIS    2025250     91400   18.5800 -111.2000      12.1        98       135        93
VIS    2025250     91400   18.5700 -111.2200      13.7        98       133       100
VIS    2025250     91400   18.5500 -111.2500      13.7        96       131        96
VIS    2025250     91400   18.5600 -111.2900      12.6        95       131        97
VIS    2025250     91400   18.5500 -111.3200      11.9        96       128       100
VIS    2025250     91400   18.5500 -111.3400      11.6        96       128       100
VIS    2025250     91400   18.5600 -111.4100       7.1        72       131        99
VIS    2025250     91400   18.5600 -111.4400       7.9        78       132        99
VIS    2025250     91400   18.5500 -111.4600       7.9        78       130        99
VIS    2025250     91400   18.5500 -111.5000      10.4        78       135        98
VIS    2025250     91400   18.5500 -111.5300       9.5        77       139        99
VIS    2025250     91400   18.5500 -111.5400       9.3        79       139       100
VIS    2025250     91400   18.5400 -111.6700       6.0        98       141        91
VIS    2025250     91400   18.5500 -111.8600       4.7        82       144        91
VIS    2025250     91400   18.5600 -111.8800       4.6        81       146        95
VIS    2025250     91400   18.5400 -112.1600       6.7       103       166       100
VIS    2025250     91400   18.5400 -112.4100       6.1        59       161       100
VIS    2025250     91400   18.5400 -112.4700       7.7        54       164        91
VIS    2025250     91400   18.5300 -112.5300       5.7        45       162        90
VIS    2025250     91400   18.5400 -112.5400       5.5        44       164        95
VIS    2025250     91400   18.5100 -112.7800       6.0       134       142        92
VIS    2025250     91400   18.5100 -112.8000       6.1       136       140        99
VIS    2025250     91400   18.5200 -112.8500       6.1       157       150        99
VIS    2025250     91400   18.5300 -112.8800       6.3       145       145       100
VIS    2025250     91400   18.5200 -112.8900       6.3       145       134        98
VIS    2025250     91400   18.5000 -112.9200       6.0       144       131        94
VIS    2025250     91400   18.5200 -113.0700       4.5       158       168        99
VIS    2025250     91400   18.5100 -113.1800       5.0       146       156        99
VIS    2025250     91400   18.4900 -113.3800       9.4       152       131       100
VIS    2025250     91400   18.5100 -113.3800       8.6       149       128        98
VIS    2025250     91400   18.5000 -113.4300       8.4       144       126        98
VIS    2025250     91400   18.5000 -113.4500       7.8       142       116        98
VIS    2025250     91400   18.5100 -113.5700       5.0       163       133        97
VIS    2025250     91400   18.5100 -113.5800       4.9       160       133        97
VIS    2025250     91400   18.5000 -113.6200       4.8       161       142       100
VIS    2025250     91400   18.5000 -113.6600       4.0       156       142        92
VIS    2025250     91400   18.4900 -113.6800       4.2       157       147        93
VIS    2025250     91400   18.4800 -113.9200       4.7       168       140        99
VIS    2025250     91400   18.4900 -113.9200       5.3       169       141       100
VIS    2025250     91400   18.4800 -113.9700       6.3       163       150       100
VIS    2025250     91400   18.4700 -113.9900       6.8       161       152       100
VIS    2025250     91400   18.4800 -114.0100       6.3       159       152        98
VIS    2025250     91400   18.4900 -114.0600       6.7       171       148        99
VIS    2025250     91400   18.4900 -114.0700       7.3       174       144        99
VIS    2025250     91400   18.4800 -114.1000       7.6       173       144        99
VIS    2025250     91400   18.4800 -114.1500       7.9       171       142       100
VIS    2025250     91400   18.4800 -114.1600       7.8       172       141       100
VIS    2025250     91400   18.4900 -114.2000       7.7       178       146        99
VIS    2025250     91400   18.4900 -114.2300       7.6       181       144       100
VIS    2025250     91400   18.4700 -114.2600       8.1       188       140        99
VIS    2025250     91400   18.4800 -114.2700       8.0       187       139        99
VIS    2025250     91400   18.4800 -114.3100       7.7       188       148        99
VIS    2025250     91400   18.4600 -114.3300       7.3       197       149       100
VIS    2025250     91400   18.4700 -114.3700       7.2       199       148       100
VIS    2025250     91400   18.4600 -114.4100       6.6       204       143        99
VIS    2025250     91400   18.4700 -114.4100       6.6       204       143       100
VIS    2025250     91400   18.4800 -114.4400       6.1       204       142       100
VIS    2025250     91400   18.4800 -114.4700       4.6       207       145        97
VIS    2025250     91400   18.4800 -114.5200       5.4       221       154       100
VIS    2025250     91400   18.4800 -114.5400       5.7       226       157        99
VIS    2025250     91400   18.4800 -114.5600       6.0       236       158        99
VIS    2025250     91400   18.4800 -114.5800       6.3       244       159       100
VIS    2025250     91400   18.4800 -114.6100       7.5       244       159        97
VIS    2025250     91400   18.4700 -114.9600       5.8       228       177        98
VIS    2025250     91400   18.4600 -115.0100       4.0       283       176        98
VIS    2025250     91400   18.4200 -116.0100       5.2       167       174       100
VIS    2025250     91400   18.4300 -116.0300       6.0       183       176        99
VIS    2025250     91400   18.4300 -116.0400       6.1       202       179       100
VIS    2025250     91400   18.4200 -116.5200       4.1        89       169        99
VIS    2025250     91400   18.3700 -118.1200      12.5        28       181       100
VIS    2025250     91400   18.3800 -118.2400       4.5        26       180        99
VIS    2025250     91400   18.3600 -118.2700       5.3        24       177        95
VIS    2025250     91400   18.3600 -118.3000       5.6        26       178        97
VIS    2025250     91400   18.3600 -118.3700       7.0       349       183        93
VIS    2025250     91400   18.3500 -119.0700      15.8         8       181        99
VIS    2025250     91400   18.3400 -119.1500      15.2        10       169        97
VIS    2025250     91400   18.3500 -119.1600      14.9         8       169        97
VIS    2025250     91400   18.3400 -119.1800      15.7         7       169        97
VIS    2025250     91400   18.6300 -108.6000       7.6        78       155       100
VIS    2025250     91400   18.6300 -108.6500       7.9        68       156        98
VIS    2025250     91400   18.6200 -108.6700       8.1        54       159        98
VIS    2025250     91400   18.6200 -108.8300       9.1        68       161        99
VIS    2025250     91400   18.6100 -108.8700       9.8        68       154        99
VIS    2025250     91400   18.6100 -108.8900      10.5        75       156        98
VIS    2025250     91400   18.6100 -108.9100      10.5        74       157        97
VIS    2025250     91400   18.5600 -110.4500       8.6        62       151        95
VIS    2025250     91400   18.5700 -110.4700       9.6        61       148        90
VIS    2025250     91400   18.5700 -110.5400      11.3        75       125       100
VIS    2025250     91400   18.5600 -110.5700       9.8        77       124       100
VIS    2025250     91400   18.5500 -110.6000       9.4        80       126       100
VIS    2025250     91400   18.5600 -110.6300      10.7        80       126       100
VIS    2025250     91400   18.5600 -110.7000       9.1        95       138        96
VIS    2025250     91400   18.5700 -110.7100       9.2        95       139        92
VIS    2025250     91400   18.5500 -110.7600       8.3        91       155        96
VIS    2025250     91400   18.5400 -110.8400       9.9        87       161        91
VIS    2025250     91400   18.5600 -111.0000      13.4       100       141       100
VIS    2025250     91400   18.5400 -111.0600      13.0        96       145       100
VIS    2025250     91400   18.5400 -111.0700      12.9        95       151        99
VIS    2025250     91400   18.5500 -111.1200      12.2        88       154        98
VIS    2025250     91400   18.5500 -111.1200      12.1        89       150        98
VIS    2025250     91400   18.5500 -111.1700      11.0        93       143        99
VIS    2025250     91400   18.5400 -111.2100      13.7        94       134       100
VIS    2025250     91400   18.5500 -111.2300      14.0        95       130        99
VIS    2025250     91400   18.5500 -111.2600      13.6        96       131        95
VIS    2025250     91400   18.5300 -111.3000      12.4        96       128        99
VIS    2025250     91400   18.5300 -111.3200      12.2        94       126       100
VIS    2025250     91400   18.5300 -111.3500      12.5        95       127        99
VIS    2025250     91400   18.5500 -111.4000       6.7        67       130        96
VIS    2025250     91400   18.5400 -111.4600       7.7        78       130        94
VIS    2025250     91400   18.5400 -111.4800       9.6        73       133        97
VIS    2025250     91400   18.5200 -111.5400       9.3        75       136       100
VIS    2025250     91400   18.5200 -111.5500       8.3        80       139        91
VIS    2025250     91400   18.5000 -112.2900       4.8       143       157        94
VIS    2025250     91400   18.5100 -112.5000       8.6        55       161        98
VIS    2025250     91400   18.5000 -112.5200       6.1        57       160       100
VIS    2025250     91400   18.4900 -112.7900       6.4       134       132        97
VIS    2025250     91400   18.5000 -112.8100       6.3       137       132       100
VIS    2025250     91400   18.4800 -112.8400       6.2       140       128        98
VIS    2025250     91400   18.4900 -112.8700       5.6       150       131       100
VIS    2025250     91400   18.4800 -112.9100       5.2       155       129        99
VIS    2025250     91400   18.5000 -112.9400       6.1       140       134        97
VIS    2025250     91400   18.4800 -113.4100       6.2        30       131        99
VIS    2025250     91400   18.4800 -113.5600       4.1       142       142        90
VIS    2025250     91400   18.4600 -113.5900       4.6       126       146       100
VIS    2025250     91400   18.4600 -113.6400       5.0       157       154        94
VIS    2025250     91400   18.4700 -113.6400       5.7       165       153        97
VIS    2025250     91400   18.4800 -113.6800       4.5       161       147        99
VIS    2025250     91400   18.4600 -113.9100       4.1       164       140       100
VIS    2025250     91400   18.4500 -113.9300       4.3       163       141       100
VIS    2025250     91400   18.4500 -113.9800       5.9       160       146       100
VIS    2025250     91400   18.4700 -114.0000       6.9       161       152       100
VIS    2025250     91400   18.4700 -114.0400       6.5       160       152        95
VIS    2025250     91400   18.4700 -114.0400       6.4       162       152        96
VIS    2025250     91400   18.4500 -114.0900       5.7       169       148        99
VIS    2025250     91400   18.4400 -114.1000       6.0       168       146        99
VIS    2025250     91400   18.4500 -114.1400       8.1       171       144        99
VIS    2025250     91400   18.4500 -114.1800       7.5       177       139       100
VIS    2025250     91400   18.4400 -114.1900       7.3       177       138       100
VIS    2025250     91400   18.4400 -114.2400       7.6       187       144       100
VIS    2025250     91400   18.4400 -114.2500       7.8       187       145        99
VIS    2025250     91400   18.4400 -114.2700       8.1       192       145        99
VIS    2025250     91400   18.4500 -114.3200       7.2       201       147       100
VIS    2025250     91400   18.4500 -114.3300       7.2       200       149       100
VIS    2025250     91400   18.4500 -114.3800       6.9       202       147        99
VIS    2025250     91400   18.4500 -114.3900       6.7       203       147        97
VIS    2025250     91400   18.4500 -114.4300       6.2       204       143        99
VIS    2025250     91400   18.4300 -114.4600       5.0       209       147       100
VIS    2025250     91400   18.4400 -114.5100       4.2       222       156        93
VIS    2025250     91400   18.4500 -114.5400       5.2       227       160       100
VIS    2025250     91400   18.4400 -114.5800       5.7       245       162        92
VIS    2025250     91400   18.4400 -114.8100       8.9       193       178        99
VIS    2025250     91400   18.4200 -114.8400       4.9       281       183        99
VIS    2025250     91400   18.4000 -115.9600       4.3       215       175        94
VIS    2025250     91400   18.4000 -116.0100       5.0       171       176       100
VIS    2025250     91400   18.4000 -116.0300       5.1       166       176       100
VIS    2025250     91400   18.4000 -116.0700       6.5       209       179        99
VIS    2025250     91400   18.4100 -116.0700       6.4       208       180        99
VIS    2025250     91400   18.4100 -116.1300       4.1       269       180        90
VIS    2025250     91400   18.3800 -116.6500       4.1        38       161        96
VIS    2025250     91400   18.3400 -118.1300      10.4        49       176        93
VIS    2025250     91400   18.3600 -118.2100       6.1        29       179        96
VIS    2025250     91400   18.3400 -118.2500       5.5        22       175        97
VIS    2025250     91400   18.3500 -118.2700       5.2        24       177        95
VIS    2025250     91400   18.3500 -118.2900       5.6        26       177        99
VIS    2025250     91400   18.3400 -118.3400       5.5       354       185        97
VIS    2025250     91400   18.3400 -118.3500       5.4       353       187        95
VIS    2025250     91400   18.3500 -118.3800       7.1       343       183        95
VIS    2025250     91400   18.3500 -118.4000       7.2       342       183        93
VIS    2025250     91400   18.3300 -119.1400      14.9        12       169        96
VIS    2025250     91400   18.3300 -119.1500      15.4        10       169        97
VIS    2025250     91400   18.3300 -119.1800      15.6         8       169        99
VIS    2025250     91400   18.6000 -108.8000       8.7        73       159        97
VIS    2025250     91400   18.6000 -108.8400       9.5        67       155       100
VIS    2025250     91400   18.5900 -108.8600      10.0        68       151        96
VIS    2025250     91400   18.5800 -108.9100      10.6        77       151        95
VIS    2025250     91400   18.6000 -108.9200      10.6        72       156        95
VIS    2025250     91400   18.5700 -109.3100       7.4        44       190       100
VIS    2025250     91400   18.5300 -110.4700       8.2        59       150        90
VIS    2025250     91400   18.5300 -110.5000       8.5        47       149        97
VIS    2025250     91400   18.5500 -110.5500      10.8        78       129       100
VIS    2025250     91400   18.5400 -110.5900       9.7        81       126       100
VIS    2025250     91400   18.5500 -110.5900       9.4        80       126       100
VIS    2025250     91400   18.5200 -110.6400      10.3        88       132        95
VIS    2025250     91400   18.5200 -110.6800       9.4        82       138        90
VIS    2025250     91400   18.5400 -110.7100       8.7        89       138        99
VIS    2025250     91400   18.5300 -110.7100       9.0        85       138        96
VIS    2025250     91400   18.5300 -110.7500       9.0        90       151        97
VIS    2025250     91400   18.5300 -110.7700       9.0        96       158        99
VIS    2025250     91400   18.5400 -110.8400       9.9        90       159        95
VIS    2025250     91400   18.5300 -110.8600      10.7        93       157        96
VIS    2025250     91400   18.5200 -110.8900      12.0       100       152        94
VIS    2025250     91400   18.5200 -111.0200      12.8        96       140        99
VIS    2025250     91400   18.5200 -111.0600      12.9        96       150        99
VIS    2025250     91400   18.5300 -111.0800      12.9        94       154        99
VIS    2025250     91400   18.5100 -111.1100      12.6        92       154        94
VIS    2025250     91400   18.5200 -111.1400      13.0        93       147        98
VIS    2025250     91400   18.5300 -111.1800      12.9        96       138       100
VIS    2025250     91400   18.5200 -111.2000      13.2        95       136       100
VIS    2025250     91400   18.5100 -111.2200      13.1        94       134       100
VIS    2025250     91400   18.5200 -111.2600      13.3        95       132        90
VIS    2025250     91400   18.5000 -111.3100      11.8        96       126       100
VIS    2025250     91400   18.5200 -111.3300      12.2        95       126        99
VIS    2025250     91400   18.5100 -111.3500      12.1        97       126        96
VIS    2025250     91400   18.5200 -111.4200       6.4        69       127       100
VIS    2025250     91400   18.5100 -111.5100      10.2        72       134        97
VIS    2025250     91400   18.5200 -111.5400       9.3        75       136       100
VIS    2025250     91400   18.4900 -111.7300       6.8       160       153        99
VIS    2025250     91400   18.5100 -111.8500       6.1        90       138        92
VIS    2025250     91400   18.4800 -111.9000       6.1        79       151        92
VIS    2025250     91400   18.4900 -111.9900       7.0       107       155        97
VIS    2025250     91400   18.4800 -112.0100       7.0       101       155        98
VIS    2025250     91400   18.4900 -112.0300       7.3        92       157        98
VIS    2025250     91400   18.4800 -112.0800       6.7        81       159        97
VIS    2025250     91400   18.4800 -112.1200       6.1        90       155        94
VIS    2025250     91400   18.4700 -112.2500       4.6       133       153        99
VIS    2025250     91400   18.4800 -112.2700       4.5       126       149       100
VIS    2025250     91400   18.4700 -112.2900       4.6       138       147       100
VIS    2025250     91400   18.4800 -112.3200       5.0       148       147        92
VIS    2025250     91400   18.4900 -112.4900      11.3        53       155        99
VIS    2025250     91400   18.4700 -112.6300       8.7        14       153       100
VIS    2025250     91400   18.4700 -112.6400       8.6        14       152        99
VIS    2025250     91400   18.4700 -112.7800       7.0       133       126        94
VIS    2025250     91400   18.4600 -112.8000       7.2       133       126        98
VIS    2025250     91400   18.4600 -112.8200       6.9       134       126        98
VIS    2025250     91400   18.4700 -112.8400       6.3       137       127        98
VIS    2025250     91400   18.4700 -112.8900       4.7       150       128        96
VIS    2025250     91400   18.4700 -112.9100       5.1       156       129        99
VIS    2025250     91400   18.4700 -112.9300       4.9       156       129        99
VIS    2025250     91400   18.4600 -113.1500       6.0       159       156       100
VIS    2025250     91400   18.4500 -113.1700       5.2       162       157        98
VIS    2025250     91400   18.4600 -113.4200       5.4        39       131        99
VIS    2025250     91400   18.4300 -113.6100       4.4       101       146        99
VIS    2025250     91400   18.4400 -113.7500       4.2       147       153        92
VIS    2025250     91400   18.4300 -113.7700       4.1       146       160        95
VIS    2025250     91400   18.4300 -113.9300       4.2       160       141       100
VIS    2025250     91400   18.4300 -113.9600       4.5       159       141       100
VIS    2025250     91400   18.4400 -113.9900       5.7       159       145       100
VIS    2025250     91400   18.4400 -113.9900       6.0       159       146       100
VIS    2025250     91400   18.4400 -114.0400       6.8       159       148        98
VIS    2025250     91400   18.4200 -114.0600       6.3       160       145        98
VIS    2025250     91400   18.4400 -114.0900       5.4       164       146        99
VIS    2025250     91400   18.4200 -114.1100       5.6       161       144        99
VIS    2025250     91400   18.4300 -114.1500       7.6       170       146        96
VIS    2025250     91400   18.4200 -114.1700       7.4       170       139       100
VIS    2025250     91400   18.4200 -114.2100       6.0       175       135        99
VIS    2025250     91400   18.4400 -114.2400       7.4       187       145       100
VIS    2025250     91400   18.4200 -114.2700       7.7       194       145       100
VIS    2025250     91400   18.4200 -114.2800       7.9       195       145       100
VIS    2025250     91400   18.4300 -114.3200       7.2       200       146       100
VIS    2025250     91400   18.4300 -114.3500       6.9       202       149       100
VIS    2025250     91400   18.4200 -114.3800       6.7       204       148       100
VIS    2025250     91400   18.4100 -114.4000       6.4       207       147        92
VIS    2025250     91400   18.4300 -114.4400       5.6       205       145        99
VIS    2025250     91400   18.4300 -114.4600       4.9       209       147       100
VIS    2025250     91400   18.4300 -114.4800       4.3       216       148        99
VIS    2025250     91400   18.4300 -114.5200       4.0       223       159        98
VIS    2025250     91400   18.4100 -114.5600       4.1       240       163       100
VIS    2025250     91400   18.4100 -114.5700       4.4       239       163       100
VIS    2025250     91400   18.4000 -114.8600       4.3       266       183        99
VIS    2025250     91400   18.4000 -114.9800       4.6       257       180        95
VIS    2025250     91400   18.3900 -115.0700       4.0       255       171        99
VIS    2025250     91400   18.3800 -115.9700       4.8       205       175        98
VIS    2025250     91400   18.3900 -116.0000       4.5       186       175        96
VIS    2025250     91400   18.3700 -116.0700       5.5       211       179        97
VIS    2025250     91400   18.3700 -116.1000       5.1       214       179       100
VIS    2025250     91400   18.3700 -116.6500       4.0        41       162        90
VIS    2025250     91400   18.3100 -118.1500      10.9        60       157        95
VIS    2025250     91400   18.3200 -118.1700      10.8        60       157        91
VIS    2025250     91400   18.3300 -118.1900       9.2        52       179        95
VIS    2025250     91400   18.3200 -118.2500       6.3        15       172       100
VIS    2025250     91400   18.3100 -118.2800       6.8        16       169       100
VIS    2025250     91400   18.3300 -118.3100       5.9        22       174        95
VIS    2025250     91400   18.3100 -118.3300       6.6        22       177        98
VIS    2025250     91400   18.3200 -118.3900       7.2       331       189        92
VIS    2025250     91400   18.3100 -119.1500      15.0        17       173        98
VIS    2025250     91400   18.3100 -119.1700      15.8         7       169       100
VIS    2025250     91400   18.2900 -119.1900      13.5        13       164        97
VIS    2025250     91400   18.5600 -108.8900      11.1        84       139       100
VIS    2025250     91400   18.5600 -108.9200      11.2        79       142        94
VIS    2025250     91400   18.5700 -108.9900      11.3        77       155        97
VIS    2025250     91400   18.5500 -109.0900       6.5        82       156        95
VIS    2025250     91400   18.5500 -109.1100       5.9        79       156        98
VIS    2025250     91400   18.5500 -109.1500       5.9        61       161        92
VIS    2025250     91400   18.5500 -109.2900       7.4        61       188        97
VIS    2025250     91400   18.5500 -109.2900       7.4        53       188        99
VIS    2025250     91400   18.5200 -110.4900       8.9        53       149        97
VIS    2025250     91400   18.5000 -110.5200      10.7        57       149        92
VIS    2025250     91400   18.5200 -110.5600      12.5        79       134       100
VIS    2025250     91400   18.5000 -110.5900      13.1        82       140        99
VIS    2025250     91400   18.5100 -110.6100      12.6        83       134       100
VIS    2025250     91400   18.5000 -110.6500      10.8        86       136        90
VIS    2025250     91400   18.5100 -110.6700      10.3        87       133        94
VIS    2025250     91400   18.5000 -110.7100      11.2        89       138        90
VIS    2025250     91400   18.5200 -110.7200       9.4        85       138        95
VIS    2025250     91400   18.5100 -110.7700       9.2        93       153        96
VIS    2025250     91400   18.4900 -110.7800       9.8        93       153        96
VIS    2025250     91400   18.4900 -110.8100      10.5        99       155        98
VIS    2025250     91400   18.5000 -110.8600      12.1        99       152        96
VIS    2025250     91400   18.5000 -110.9100      12.2       101       151        95
VIS    2025250     91400   18.5000 -111.0400      12.4        94       144       100
VIS    2025250     91400   18.5000 -111.0500      12.6        94       146       100
VIS    2025250     91400   18.4800 -111.0900      12.7        92       150        99
VIS    2025250     91400   18.5000 -111.1300      12.4        91       151        93
VIS    2025250     91400   18.5000 -111.1400      12.5        92       151        92
VIS    2025250     91400   18.4900 -111.1700      12.8        95       146        97
VIS    2025250     91400   18.4900 -111.2200      12.7        93       136       100
VIS    2025250     91400   18.4900 -111.2300      12.6        92       136       100
VIS    2025250     91400   18.5000 -111.2600      13.4        92       134        98
VIS    2025250     91400   18.5000 -111.3100      11.6        96       126       100
VIS    2025250     91400   18.4900 -111.3300      11.7        97       127       100
VIS    2025250     91400   18.4900 -111.3500      11.7        97       127        99
VIS    2025250     91400   18.4900 -111.3800       9.2        95       128        94
VIS    2025250     91400   18.4700 -111.4300       6.8        80       126        94
VIS    2025250     91400   18.4900 -111.7200       7.2       157       153        90
VIS    2025250     91400   18.4900 -111.7300       6.4       162       153       100
VIS    2025250     91400   18.4700 -111.8600       4.6       103       138        95
VIS    2025250     91400   18.4600 -111.9700       4.8       109       155        98
VIS    2025250     91400   18.4700 -112.0100       6.5       101       154        99
VIS    2025250     91400   18.4600 -112.1100       6.6        81       156        99
VIS    2025250     91400   18.4500 -112.1400       5.1       104       155        94
VIS    2025250     91400   18.4600 -112.1700       5.3       114       155        99
VIS    2025250     91400   18.4700 -112.1700       5.1       116       155        92
VIS    2025250     91400   18.4500 -112.2000       5.4       120       156       100
VIS    2025250     91400   18.4500 -112.2500       5.5       126       148        98
VIS    2025250     91400   18.4600 -112.2700       4.7       128       147       100
VIS    2025250     91400   18.4700 -112.2900       4.5       137       147       100
VIS    2025250     91400   18.4400 -112.6100       8.5         9       147        92
VIS    2025250     91400   18.4400 -112.6100       8.4        12       147        94
VIS    2025250     91400   18.4300 -112.7700       7.5       135       123        96
VIS    2025250     91400   18.4500 -112.8000       7.3       133       125        97
VIS    2025250     91400   18.4500 -112.8100       7.0       133       126        99
VIS    2025250     91400   18.4500 -112.8500       6.0       141       127       100
VIS    2025250     91400   18.4200 -113.4000       4.1        68       143        95
VIS    2025250     91400   18.4200 -113.4500       4.4        83       144        99
VIS    2025250     91400   18.4100 -113.4500       4.6        90       150       100
VIS    2025250     91400   18.4200 -113.6000       4.1        99       138        99
VIS    2025250     91400   18.4200 -113.7600       4.1       146       160        94
VIS    2025250     91400   18.4200 -113.7700       4.0       146       162        95
VIS    2025250     91400   18.4100 -113.8200       4.9       140       156       100
VIS    2025250     91400   18.4200 -113.8200       4.7       141       152       100
VIS    2025250     91400   18.4200 -113.8800       4.3       141       148       100
VIS    2025250     91400   18.4100 -113.9000       4.6       142       149        99
VIS    2025250     91400   18.4100 -113.9100       4.5       146       148        95
VIS    2025250     91400   18.4200 -113.9600       4.3       156       139       100
VIS    2025250     91400   18.4200 -113.9700       4.5       157       139       100
VIS    2025250     91400   18.4200 -114.0000       5.4       152       138        99
VIS    2025250     91400   18.4100 -114.0500       5.8       158       139        98
VIS    2025250     91400   18.4100 -114.0800       6.5       159       136        95
VIS    2025250     91400   18.4100 -114.1100       6.2       160       141        98
VIS    2025250     91400   18.4100 -114.1500       7.1       168       140        98
VIS    2025250     91400   18.4100 -114.1900       6.5       172       132       100
VIS    2025250     91400   18.4100 -114.2100       5.7       174       132        99
VIS    2025250     91400   18.4100 -114.2200       5.4       174       132        99
VIS    2025250     91400   18.3900 -114.2700       6.2       200       140       100
VIS    2025250     91400   18.4100 -114.2800       7.8       198       145       100
VIS    2025250     91400   18.4000 -114.3300       7.0       204       147       100
VIS    2025250     91400   18.4000 -114.3500       6.7       206       149       100
VIS    2025250     91400   18.4000 -114.3800       6.9       206       148       100
VIS    2025250     91400   18.3900 -114.4000       6.5       211       148        98
VIS    2025250     91400   18.3900 -114.4300       6.1       214       149        99
VIS    2025250     91400   18.4000 -114.4600       6.1       204       151       100
VIS    2025250     91400   18.4000 -114.5000       4.8       206       156        99
VIS    2025250     91400   18.4000 -114.5700       4.2       240       163       100
VIS    2025250     91400   18.3800 -114.6000       9.3       251       165        92
VIS    2025250     91400   18.3800 -114.6500       4.6       224       168        91
VIS    2025250     91400   18.3800 -114.9000       4.5       242       183        90
VIS    2025250     91400   18.3900 -114.9300       4.6       240       185        95
VIS    2025250     91400   18.3800 -115.0000       4.5       254       185       100
VIS    2025250     91400   18.3700 -115.0400       4.0       260       175       100
VIS    2025250     91400   18.3800 -115.0700       4.0       255       173       100
VIS    2025250     91400   18.3900 -115.0700       4.0       255       172        99
VIS    2025250     91400   18.3400 -115.9800       6.8       202       175        99
VIS    2025250     91400   18.3400 -116.0100       5.0       206       174        95
VIS    2025250     91400   18.3300 -116.6100       4.8       346       162        99
VIS    2025250     91400   18.3300 -116.7400       6.9        18       159        97
VIS    2025250     91400   18.3400 -116.7900      10.4       171       165        98
VIS    2025250     91400   18.3000 -118.1600      11.2        58       155        96
VIS    2025250     91400   18.3000 -118.1800      11.7        57       143        99
VIS    2025250     91400   18.3000 -118.1900      11.8        54       154       100
VIS    2025250     91400   18.2900 -118.2200      11.9        40       154       100
VIS    2025250     91400   18.2900 -118.2700       8.4        19       166       100
VIS    2025250     91400   18.3000 -118.2700       7.1        15       169        99
VIS    2025250     91400   18.3000 -118.3200       7.1        21       173        99
VIS    2025250     91400   18.2900 -118.3300       7.4        21       173       100
VIS    2025250     91400   18.3000 -118.3500       7.2        21       180        97
VIS    2025250     91400   18.2700 -119.0800      11.4         4       184        93
VIS    2025250     91400   18.2900 -119.0900      10.6         2       189        91
VIS    2025250     91400   18.2700 -119.2000      14.5        16       164        99
VIS    2025250     91400   18.5400 -108.8900      13.1        91       134        99
VIS    2025250     91400   18.5400 -109.0100      11.5        71       140        99
VIS    2025250     91400   18.5500 -109.0400      10.1        72       150        99
VIS    2025250     91400   18.5500 -109.0600       8.6        71       156        99
VIS    2025250     91400   18.5400 -109.1100       6.0        78       156        98
VIS    2025250     91400   18.5400 -109.1200       5.2        74       155        96
VIS    2025250     91400   18.5200 -109.2900       7.9        64       189        90
VIS    2025250     91400   18.4800 -110.5400       9.8        53       147       100
VIS    2025250     91400   18.5000 -110.5800      13.0        81       140        98
VIS    2025250     91400   18.4800 -110.6300      12.6        82       139       100
VIS    2025250     91400   18.4800 -110.6500      11.6        85       137        98
VIS    2025250     91400   18.4700 -110.6900      11.3        89       138        95
VIS    2025250     91400   18.4700 -110.8100       9.6        94       153        99
VIS    2025250     91400   18.4700 -110.8200       9.9        94       154        99
VIS    2025250     91400   18.4700 -110.8700      13.1        92       149       100
VIS    2025250     91400   18.4900 -110.9000      12.2        98       148        92
VIS    2025250     91400   18.4900 -110.9100      10.2        95       151        92
VIS    2025250     91400   18.4800 -111.0800      12.6        92       149       100
VIS    2025250     91400   18.4800 -111.0900      12.6        91       149        99
VIS    2025250     91400   18.4800 -111.2100      11.7        92       141        96
VIS    2025250     91400   18.4800 -111.2400      12.5        90       137       100
VIS    2025250     91400   18.4600 -111.2900      12.0        89       133       100
VIS    2025250     91400   18.4700 -111.3000      11.9        91       133       100
VIS    2025250     91400   18.4700 -111.3400      11.8        95       127       100
VIS    2025250     91400   18.4700 -111.3600      11.1        92       127        99
VIS    2025250     91400   18.4500 -111.3900       9.0        81       125        96
VIS    2025250     91400   18.4700 -111.4300       6.9        81       126        96
VIS    2025250     91400   18.4500 -111.4700       7.7        93       126       100
VIS    2025250     91400   18.4500 -111.4700       7.9        96       126        99
VIS    2025250     91400   18.4500 -111.5000       7.0        97       127        95
VIS    2025250     91400   18.4400 -111.6900       5.5       128       134        97
VIS    2025250     91400   18.4300 -111.9100       6.3        92       143       100
VIS    2025250     91400   18.4500 -111.9500       5.9        99       153        96
VIS    2025250     91400   18.4500 -112.0000       5.0       113       154        90
VIS    2025250     91400   18.4300 -112.1000       6.3        81       154        92
VIS    2025250     91400   18.4500 -112.1400       5.5        96       155        98
VIS    2025250     91400   18.4300 -112.1600       6.0       104       156        99
VIS    2025250     91400   18.4500 -112.1800       5.5       112       155        94
VIS    2025250     91400   18.4300 -112.2300       6.0       135       153        91
VIS    2025250     91400   18.4400 -112.2500       5.7       126       148        97
VIS    2025250     91400   18.4400 -112.2700       5.3       124       145        97
VIS    2025250     91400   18.4400 -112.2900       4.3       127       143        99
VIS    2025250     91400   18.4300 -112.6200       8.4        11       147        92
VIS    2025250     91400   18.4100 -112.7600       7.7       138       123       100
VIS    2025250     91400   18.4300 -112.7700       7.7       136       123        99
VIS    2025250     91400   18.4100 -112.8200       6.8       133       124        98
VIS    2025250     91400   18.4100 -112.8200       6.4       137       125        99
VIS    2025250     91400   18.4000 -113.3900       4.4       101       145        99
VIS    2025250     91400   18.4000 -113.4000       4.4       100       147        98
VIS    2025250     91400   18.4000 -113.4400       4.3        96       150        98
VIS    2025250     91400   18.3900 -113.4800       4.8        94       155        98
VIS    2025250     91400   18.3900 -113.4900       5.1       101       155       100
VIS    2025250     91400   18.4000 -113.5500       4.9        84       142        95
VIS    2025250     91400   18.3900 -113.8000       4.6       144       160        99
VIS    2025250     91400   18.3900 -113.8200       5.2       139       157       100
VIS    2025250     91400   18.3800 -113.8600       5.4       139       154       100
VIS    2025250     91400   18.3800 -113.8700       5.6       137       153        99
VIS    2025250     91400   18.4000 -113.9000       4.6       139       152       100
VIS    2025250     91400   18.3800 -113.9600       5.0       155       140        95
VIS    2025250     91400   18.3800 -113.9900       5.5       153       136        98
VIS    2025250     91400   18.3800 -114.0300       5.2       147       135        93
VIS    2025250     91400   18.3900 -114.0900       6.0       160       128        97
VIS    2025250     91400   18.3900 -114.1300       6.8       164       132       100
VIS    2025250     91400   18.3800 -114.1600       6.3       169       130       100
VIS    2025250     91400   18.3800 -114.1900       5.2       172       128       100
VIS    2025250     91400   18.3900 -114.2600       5.6       199       137       100
VIS    2025250     91400   18.3600 -114.3000       6.1       226       142       100
VIS    2025250     91400   18.3600 -114.3300       6.5       225       150        99
VIS    2025250     91400   18.3800 -114.3500       7.2       209       151       100
VIS    2025250     91400   18.3600 -114.3900       7.3       213       152        99
VIS    2025250     91400   18.3600 -114.4100       6.3       223       153       100
VIS    2025250     91400   18.3800 -114.4400       6.2       219       152        99
VIS    2025250     91400   18.3700 -114.4600       6.6       221       155       100
VIS    2025250     91400   18.3800 -114.6000       9.5       253       165        96
VIS    2025250     91400   18.3700 -114.6400       4.7       226       167        93
VIS    2025250     91400   18.3500 -114.6700       4.7       237       169        99
VIS    2025250     91400   18.3600 -114.6900       5.0       234       169        96
VIS    2025250     91400   18.3600 -114.8300       6.8       215       182        95
VIS    2025250     91400   18.3600 -114.8800       6.4       229       183       100
VIS    2025250     91400   18.3700 -114.8800       6.2       231       183       100
VIS    2025250     91400   18.3700 -114.9100       4.5       241       184        90
VIS    2025250     91400   18.3500 -115.0200       4.4       265       185        99
VIS    2025250     91400   18.3600 -115.0400       4.0       262       175       100
VIS    2025250     91400   18.3400 -115.0700       4.0       268       178        97
VIS    2025250     91400   18.3300 -115.9800       6.8       201       175        99
VIS    2025250     91400   18.3200 -116.6300       5.2       346       157        92
VIS    2025250     91400   18.2900 -117.0000       8.4         5       164        90
VIS    2025250     91400   18.2700 -118.0300       6.1       153       184        91
VIS    2025250     91400   18.2900 -118.0400       6.0       150       182        91
VIS    2025250     91400   18.2700 -118.1300      11.9        48       151        93
VIS    2025250     91400   18.2600 -118.1700      12.2        52       136       100
VIS    2025250     91400   18.2700 -118.1800      12.1        53       136       100
VIS    2025250     91400   18.2600 -118.2200      11.8        40       142        99
VIS    2025250     91400   18.2600 -118.2300      11.9        37       153       100
VIS    2025250     91400   18.2800 -118.2500       9.8        26       162       100
VIS    2025250     91400   18.2800 -118.2900       8.7        21       166       100
VIS    2025250     91400   18.2700 -118.3200       8.0        21       168       100
VIS    2025250     91400   18.2700 -118.3300       7.8        20       173        99
VIS    2025250     91400   18.2400 -119.0900      12.0         7       182        96
VIS    2025250     91400   18.2400 -119.1300      13.6        15       181        97
VIS    2025250     91400   18.5100 -108.9500       8.1        66       126        99
VIS    2025250     91400   18.5200 -109.0500      10.2        68       140        93
VIS    2025250     91400   18.5000 -109.0900      10.2        68       130        99
VIS    2025250     91400   18.5000 -109.1000       9.9        65       132        93
VIS    2025250     91400   18.5000 -109.1400       5.8        52       142        94
VIS    2025250     91400   18.5000 -109.1500       5.0        68       150        99
VIS    2025250     91400   18.5100 -109.1900       5.8        79       153        98
VIS    2025250     91400   18.4600 -110.5300       9.6        42       147        98
VIS    2025250     91400   18.4700 -110.5700      13.0        78       146        96
VIS    2025250     91400   18.4500 -110.5900      12.2        78       146        99
VIS    2025250     91400   18.4500 -110.6200      11.8        83       146        98
VIS    2025250     91400   18.4500 -110.6400      12.0        82       146        98
VIS    2025250     91400   18.4700 -110.6900       9.8        91       140        93
VIS    2025250     91400   18.4700 -110.7300      12.3        90       142        98
VIS    2025250     91400   18.4500 -110.7800       9.5        88       147        95
VIS    2025250     91400   18.4600 -110.7900       9.4        88       149        97
VIS    2025250     91400   18.4600 -110.8200      10.3        93       154       100
VIS    2025250     91400   18.4600 -110.8700      13.1        90       149       100
VIS    2025250     91400   18.4600 -110.8800      12.9        90       149        99
VIS    2025250     91400   18.4500 -111.0500      10.2        77       150       100
VIS    2025250     91400   18.4500 -111.0600      11.0        82       149        98
VIS    2025250     91400   18.4500 -111.0900      12.4        83       149       100
VIS    2025250     91400   18.4500 -111.2000       8.1        85       145        92
VIS    2025250     91400   18.4400 -111.2300       8.2        87       142        97
VIS    2025250     91400   18.4400 -111.2600       8.6        91       140        97
VIS    2025250     91400   18.4300 -111.2800       8.8        95       139        99
VIS    2025250     91400   18.4500 -111.3500      10.5        89       127       100
VIS    2025250     91400   18.4300 -111.3800       8.0        81       125        97
VIS    2025250     91400   18.4400 -111.3900       8.5        80       125        97
VIS    2025250     91400   18.4200 -111.4200       7.9        82       125        97
VIS    2025250     91400   18.4400 -111.4700       8.2        98       126       100
VIS    2025250     91400   18.4200 -111.7100       4.9       132       115        99
VIS    2025250     91400   18.4300 -111.7100       4.4       136       130        91
VIS    2025250     91400   18.4100 -111.8300       4.3       163       144        97
VIS    2025250     91400   18.4200 -111.9000       6.4        93       141        98
VIS    2025250     91400   18.4200 -111.9400       7.0        99       151        97
VIS    2025250     91400   18.4200 -111.9600       6.2        90       151        99
VIS    2025250     91400   18.4300 -112.0400       5.1       122       154       100
VIS    2025250     91400   18.4200 -112.1500       4.8       108       154        99
VIS    2025250     91400   18.4200 -112.1600       5.4       103       155        99
VIS    2025250     91400   18.4200 -112.1900       6.4       105       157        96
VIS    2025250     91400   18.4000 -112.2400       8.0       122       143        93
VIS    2025250     91400   18.4000 -112.2500       7.7       123       143        95
VIS    2025250     91400   18.4000 -112.2900       6.0       127       143        99
VIS    2025250     91400   18.3900 -112.4400       4.0        95       143        90
VIS    2025250     91400   18.3900 -112.4600       4.6        85       143        97
VIS    2025250     91400   18.4000 -112.7300       7.3       141       126        95
VIS    2025250     91400   18.4000 -112.7500       7.2       140       126        99
VIS    2025250     91400   18.3900 -112.7800       5.0       141       122        94
VIS    2025250     91400   18.4000 -112.8000       6.5       133       122        91
VIS    2025250     91400   18.3800 -112.8500       6.7       136       122       100
VIS    2025250     91400   18.3900 -112.8700       6.3       153       122        92
VIS    2025250     91400   18.3800 -113.1400       6.5       131       130        95
VIS    2025250     91400   18.3700 -113.1600       6.6       136       130        91
VIS    2025250     91400   18.3800 -113.2300       6.0       135       135        93
VIS    2025250     91400   18.3700 -113.4000       7.4       118       147        95
VIS    2025250     91400   18.3600 -113.4200       7.1       120       150        99
VIS    2025250     91400   18.3600 -113.4400       6.5       120       154       100
VIS    2025250     91400   18.3800 -113.4600       5.1       107       156        99
VIS    2025250     91400   18.3800 -113.5100       4.3       105       153        96
VIS    2025250     91400   18.3800 -113.5600       4.5        80       142        99
VIS    2025250     91400   18.3500 -113.7800       4.3       158       150       100
VIS    2025250     91400   18.3600 -113.8300       4.3       148       155        99
VIS    2025250     91400   18.3700 -113.8600       5.3       140       154        99
VIS    2025250     91400   18.3700 -113.8700       5.6       137       151        99
VIS    2025250     91400   18.3500 -113.9100       5.1       139       146        99
VIS    2025250     91400   18.3500 -113.9300       4.8       145       142       100
VIS    2025250     91400   18.3500 -113.9700       5.1       150       139       100
VIS    2025250     91400   18.3600 -114.0000       5.5       150       137       100
VIS    2025250     91400   18.3600 -114.0300       5.3       143       135        99
VIS    2025250     91400   18.3500 -114.0500       4.8       141       130        98
VIS    2025250     91400   18.3700 -114.0600       5.0       150       126        97
VIS    2025250     91400   18.3500 -114.1200       4.0       148       126       100
VIS    2025250     91400   18.3500 -114.1200       4.0       147       126       100
VIS    2025250     91400   18.3600 -114.2700       5.3       225       137        95
VIS    2025250     91400   18.3600 -114.3000       5.6       231       144        98
VIS    2025250     91400   18.3400 -114.3400       5.5       238       155        99
VIS    2025250     91400   18.3600 -114.3600       7.3       217       153       100
VIS    2025250     91400   18.3600 -114.3900       7.1       217       152       100
VIS    2025250     91400   18.3600 -114.4200       6.2       226       153        99
VIS    2025250     91400   18.3400 -114.4400       6.2       233       159        98
VIS    2025250     91400   18.3500 -114.4700       5.9       234       159       100
VIS    2025250     91400   18.3300 -114.6200       9.1       226       166       100
VIS    2025250     91400   18.3300 -114.6400       5.2       231       166        97
VIS    2025250     91400   18.3300 -114.6800       5.1       229       169       100
VIS    2025250     91400   18.3300 -114.7000       5.2       227       172       100
VIS    2025250     91400   18.3400 -114.7400       4.6       221       175        91
VIS    2025250     91400   18.3400 -114.7800       5.7       209       182        94
VIS    2025250     91400   18.3400 -114.8200       7.0       218       182        93
VIS    2025250     91400   18.3300 -114.8500       8.8       231       181       100
VIS    2025250     91400   18.3300 -114.8600       9.0       230       181       100
VIS    2025250     91400   18.3300 -114.9800       4.4       241       185        98
VIS    2025250     91400   18.3400 -115.0700       4.0       271       178        95
VIS    2025250     91400   18.3100 -115.5500       4.5       218       178        99
VIS    2025250     91400   18.2800 -116.7800       4.0       351       160       100
VIS    2025250     91400   18.2900 -117.0100       9.3         3       165        93
VIS    2025250     91400   18.2800 -117.0300       8.9         2       162        98
VIS    2025250     91400   18.2600 -117.1400       8.0        17       173       100
VIS    2025250     91400   18.2600 -118.1400      12.2        50       151        98
VIS    2025250     91400   18.2500 -118.1700      12.4        52       138       100
VIS    2025250     91400   18.2500 -118.1700      12.2        52       136       100
VIS    2025250     91400   18.2500 -118.2100      11.8        42       139        98
VIS    2025250     91400   18.2600 -118.2300      11.9        38       142        99
VIS    2025250     91400   18.2600 -118.2500      11.4        28       156       100
VIS    2025250     91400   18.2500 -118.2900       9.5        21       165       100
VIS    2025250     91400   18.2500 -118.3300       8.1        18       173       100
VIS    2025250     91400   18.2500 -118.3400       7.9        16       174        99
VIS    2025250     91400   18.2500 -118.3800       6.7       354       178        93
VIS    2025250     91400   18.2400 -118.3900       6.4       354       178        98
VIS    2025250     91400   18.2200 -119.1100      12.8        13       182        99
VIS    2025250     91400   18.2200 -119.1300      13.4        14       182        96
VIS    2025250     91400   18.2200 -119.1900      14.7        24       165        96
VIS    2025250     91400   18.4900 -108.6900      10.2        45       135        99
VIS    2025250     91400   18.4800 -109.0700       9.6        69       124        92
VIS    2025250     91400   18.4700 -109.1200      12.5        80       122        91
VIS    2025250     91400   18.4700 -109.1300      12.9        83       122        97
VIS    2025250     91400   18.4900 -109.1900       6.4        81       151        91
VIS    2025250     91400   18.4700 -109.2300       5.7        65       153        95
VIS    2025250     91400   18.4500 -110.2200       8.5        40       165        95
VIS    2025250     91400   18.4400 -110.2600       9.4        59       161       100
VIS    2025250     91400   18.4400 -110.5100       9.8        48       154        98
VIS    2025250     91400   18.4300 -110.5300      10.3        48       154        96
VIS    2025250     91400   18.4300 -110.5800      11.7        72       147        91
VIS    2025250     91400   18.4300 -110.6100      11.5        82       146        99
VIS    2025250     91400   18.4400 -110.6200      11.6        83       146        99
VIS    2025250     91400   18.4300 -110.6500      11.0        84       146        98
VIS    2025250     91400   18.4400 -110.6700      11.7        86       143        96
VIS    2025250     91400   18.4200 -110.7300      11.1        86       141        96
VIS    2025250     91400   18.4200 -110.7400      11.2        85       141        96
VIS    2025250     91400   18.4200 -110.8100      10.2        86       149       100
VIS    2025250     91400   18.4400 -110.8200       9.8        91       152       100
VIS    2025250     91400   18.4300 -110.8600      11.8        86       152       100
VIS    2025250     91400   18.4400 -110.8800      12.8        82       149        99
VIS    2025250     91400   18.4200 -111.0600       9.6        66       151        95
VIS    2025250     91400   18.4100 -111.0800       9.8        68       151        94
VIS    2025250     91400   18.4300 -111.2100       8.2        88       145        96
VIS    2025250     91400   18.4200 -111.2100       8.4        88       145        94
VIS    2025250     91400   18.4200 -111.2600       9.3        91       139        96
VIS    2025250     91400   18.4100 -111.3200      10.1        84       130       100
VIS    2025250     91400   18.4200 -111.3600       8.4        79       127        95
VIS    2025250     91400   18.4200 -111.3800       7.7        82       125        96
VIS    2025250     91400   18.4100 -111.4200       7.7        86       126        95
VIS    2025250     91400   18.4000 -111.4300       7.8        88       126        99
VIS    2025250     91400   18.4200 -111.4700       8.9        76       125        90
VIS    2025250     91400   18.4100 -111.4800       9.4        65       127        98
VIS    2025250     91400   18.4100 -111.6900       5.3       131       115        94
VIS    2025250     91400   18.4100 -111.8000       5.2       161       144        96
VIS    2025250     91400   18.4000 -111.8900       5.8        83       141        98
VIS    2025250     91400   18.4000 -111.9000       6.2        88       141        99
VIS    2025250     91400   18.3800 -111.9500       6.7        84       145        93
VIS    2025250     91400   18.4000 -111.9600       7.7        96       150        97
VIS    2025250     91400   18.3800 -112.1700       4.9       108       154        99
VIS    2025250     91400   18.3800 -112.1900       5.5       112       154        99
VIS    2025250     91400   18.3700 -112.2300       7.6       129       147        94
VIS    2025250     91400   18.3900 -112.2500       7.9       122       143        92
VIS    2025250     91400   18.3900 -112.2800       7.0       119       142        99
VIS    2025250     91400   18.3700 -112.3100       7.0       114       142        98
VIS    2025250     91400   18.3700 -112.4200       4.8       124       143        97
VIS    2025250     91400   18.3800 -112.4500       4.2       104       142        93
VIS    2025250     91400   18.3900 -112.4500       4.7        91       143       100
VIS    2025250     91400   18.3700 -112.5000       6.2        99       137        96
VIS    2025250     91400   18.3700 -112.5200       6.2        99       134        96
VIS    2025250     91400   18.3600 -112.7400       5.9       156       126        95
VIS    2025250     91400   18.3600 -112.7500       5.3       153       125        93
VIS    2025250     91400   18.3600 -112.8400       6.3       135       122        98
VIS    2025250     91400   18.3600 -112.8800       5.8       138       121        98
VIS    2025250     91400   18.3600 -112.8900       5.3       141       121        95
VIS    2025250     91400   18.3600 -112.9500       5.4       158       122        91
VIS    2025250     91400   18.3600 -113.1400       6.5       132       130        98
VIS    2025250     91400   18.3700 -113.1600       6.6       138       130        96
VIS    2025250     91400   18.3600 -113.2000       6.3       146       133        97
VIS    2025250     91400   18.3600 -113.2100       6.3       142       135        97
VIS    2025250     91400   18.3500 -113.2500       6.0       130       133        90
VIS    2025250     91400   18.3600 -113.4200       7.5       120       150        99
VIS    2025250     91400   18.3600 -113.4400       6.8       120       154       100
VIS    2025250     91400   18.3600 -113.4800       5.1       118       160        94
VIS    2025250     91400   18.3400 -113.7700       4.0       161       141       100
VIS    2025250     91400   18.3500 -113.7800       4.2       158       149       100
VIS    2025250     91400   18.3500 -113.9100       5.1       141       143        99
VIS    2025250     91400   18.3300 -113.9500       4.8       151       139        98
VIS    2025250     91400   18.3200 -113.9600       4.8       151       138        99
VIS    2025250     91400   18.3300 -114.0100       4.8       145       139        94
VIS    2025250     91400   18.3200 -114.0100       4.4       144       139        93
VIS    2025250     91400   18.3400 -114.0500       4.9       138       131        99
VIS    2025250     91400   18.3300 -114.0700       4.4       138       126        98
VIS    2025250     91400   18.3300 -114.1000       4.1       136       125       100
VIS    2025250     91400   18.3200 -114.2800       4.9       273       146        94
VIS    2025250     91400   18.3300 -114.3200       4.7       249       151        95
VIS    2025250     91400   18.3300 -114.3300       5.0       241       155        99
VIS    2025250     91400   18.3200 -114.3600       5.0       247       156       100
VIS    2025250     91400   18.3300 -114.3900       5.7       241       157        99
VIS    2025250     91400   18.3200 -114.4200       5.9       241       160        99
VIS    2025250     91400   18.3300 -114.4400       6.2       238       161        98
VIS    2025250     91400   18.3200 -114.4700       5.2       251       159        95
VIS    2025250     91400   18.3300 -114.5700       7.7       215       170        98
VIS    2025250     91400   18.3100 -114.6100       8.7       219       170       100
VIS    2025250     91400   18.3100 -114.6300       9.0       224       168       100
VIS    2025250     91400   18.3000 -114.6600       5.4       230       168        96
VIS    2025250     91400   18.3200 -114.6800       5.2       227       169       100
VIS    2025250     91400   18.3000 -114.7000       5.2       220       172        98
VIS    2025250     91400   18.3200 -114.7300       5.2       221       172        99
VIS    2025250     91400   18.3000 -114.8300       5.8       239       182       100
VIS    2025250     91400   18.3100 -114.8500       7.9       234       184        99
VIS    2025250     91400   18.3200 -114.8900       4.0       248       185        99
VIS    2025250     91400   18.3000 -115.5500       4.2       214       179       100
VIS    2025250     91400   18.2500 -116.9900       6.6        10       160        90
VIS    2025250     91400   18.2500 -117.0200       8.8       356       162        97
VIS    2025250     91400   18.2400 -117.0400       8.1       353       160        99
VIS    2025250     91400   18.2600 -117.0800       8.0        11       160        94
VIS    2025250     91400   18.2500 -117.1100       8.3        16       170        98
VIS    2025250     91400   18.2500 -117.1200       8.5        16       173       100
VIS    2025250     91400   18.2300 -118.1200      11.9        46       162        93
VIS    2025250     91400   18.2300 -118.1400      12.1        51       162       100
VIS    2025250     91400   18.2200 -118.1700      11.3        50       163        96
VIS    2025250     91400   18.2300 -118.1900      11.7        51       139       100
VIS    2025250     91400   18.2100 -118.2300      12.6        34       153       100
VIS    2025250     91400   18.2300 -118.2400      12.8        29       153       100
VIS    2025250     91400   18.2100 -118.2700      12.6        16       160       100
VIS    2025250     91400   18.2100 -118.2900      11.6        13       162       100
VIS    2025250     91400   18.2100 -118.3100       9.3        17       166        97
VIS    2025250     91400   18.2100 -118.3600       5.8       356       176        99
VIS    2025250     91400   18.2100 -118.3900       5.7       357       178       100
VIS    2025250     91400   18.2300 -118.3900       6.0       355       178        98
VIS    2025250     91400   18.2100 -119.1100      13.4        16       182        97
VIS    2025250     91400   18.2000 -119.1500      14.6        29       172        95
VIS    2025250     91400   18.2000 -119.2200      16.0        33       158        97
VIS    2025250     91400   18.2000 -119.2500      15.2        33       159       100
VIS    2025250     91400   18.2000 -119.2800      15.6        33       159        91
VIS    2025250     91400   18.4800 -108.7100      10.9        47       134        91
VIS    2025250     91400   18.4600 -109.0600      10.1        74       122       100
VIS    2025250     91400   18.4700 -109.0700       9.4        71       122        95
VIS    2025250     91400   18.4600 -109.1300      12.7        81       117        90
VIS    2025250     91400   18.4400 -109.2100       5.7        53       135        93
VIS    2025250     91400   18.4600 -109.2500       5.8        65       162        98
VIS    2025250     91400   18.4300 -110.2700       9.5        59       162        99
VIS    2025250     91400   18.4100 -110.3000      10.4        54       162        95
VIS    2025250     91400   18.4100 -110.3800      12.2        68       164       100
VIS    2025250     91400   18.4200 -110.4000      12.0        72       166        99
VIS    2025250     91400   18.4200 -110.4100      12.1        73       166        98
VIS    2025250     91400   18.4200 -110.5200      10.5        50       154        96
VIS    2025250     91400   18.4200 -110.5300      10.4        49       154        96
VIS    2025250     91400   18.4100 -110.5700      10.5        59       150        90
VIS    2025250     91400   18.4200 -110.6000      12.1        77       147        98
VIS    2025250     91400   18.4200 -110.6200      11.1        82       147        97
VIS    2025250     91400   18.4100 -110.6800      11.5        91       146        99
VIS    2025250     91400   18.4200 -110.7000      11.0        88       142        99
VIS    2025250     91400   18.4200 -110.7300      11.1        85       140        96
VIS    2025250     91400   18.4200 -110.7500      11.3        84       140        96
VIS    2025250     91400   18.3900 -110.7900      11.1        82       139       100
VIS    2025250     91400   18.4000 -110.8000      10.7        82       144       100
VIS    2025250     91400   18.4000 -110.8400      10.1        86       149        99
VIS    2025250     91400   18.4100 -110.8700      10.5        85       154        96
VIS    2025250     91400   18.3900 -110.9500       9.3        73       154        91
VIS    2025250     91400   18.4000 -111.0700       9.2        58       154       100
VIS    2025250     91400   18.4100 -111.0700       9.4        64       151        92
VIS    2025250     91400   18.3800 -111.1700      11.8        86       152       100
VIS    2025250     91400   18.4000 -111.2100       7.9        89       145        96
VIS    2025250     91400   18.4000 -111.2800      11.1        84       134        97
VIS    2025250     91400   18.3800 -111.3200      11.3        83       131       100
VIS    2025250     91400   18.3800 -111.3600       8.3        80       126        93
VIS    2025250     91400   18.3800 -111.3800       7.9        81       126        97
VIS    2025250     91400   18.3900 -111.4000       7.5        83       126        93
VIS    2025250     91400   18.3700 -111.4300       7.5        88       126       100
VIS    2025250     91400   18.3900 -111.4600       8.6        78       125       100
VIS    2025250     91400   18.3800 -111.9200       6.5        81       143       100
VIS    2025250     91400   18.3600 -111.9400       6.2        89       143        99
VIS    2025250     91400   18.3700 -111.9600       6.4        84       148        91
VIS    2025250     91400   18.3700 -112.0500       4.7        99       153        91
VIS    2025250     91400   18.3600 -112.1600       5.1        97       152        99
VIS    2025250     91400   18.3700 -112.1700       4.8       105       153        98
VIS    2025250     91400   18.3500 -112.2100       6.9       116       149        92
VIS    2025250     91400   18.3700 -112.2200       7.4       128       147        94
VIS    2025250     91400   18.3500 -112.2800       8.0       117       141        97
VIS    2025250     91400   18.3500 -112.3000       8.0       112       141       100
VIS    2025250     91400   18.3500 -112.3700       4.2       124       143        93
VIS    2025250     91400   18.3500 -112.3800       4.3       132       143        95
VIS    2025250     91400   18.3500 -112.4500       5.5       113       140        93
VIS    2025250     91400   18.3500 -112.4600       5.7       109       140        94
VIS    2025250     91400   18.3400 -112.5000       4.3       111       134        97
VIS    2025250     91400   18.3400 -112.5400       5.4       108       133       100
VIS    2025250     91400   18.3400 -112.5500       5.5       109       133       100
VIS    2025250     91400   18.3400 -112.5800       5.0        99       131        95
VIS    2025250     91400   18.3300 -112.8000       6.0       126       121        99
VIS    2025250     91400   18.3400 -112.8300       5.7       128       121        95
VIS    2025250     91400   18.3300 -112.8400       5.2       127       122        93
VIS    2025250     91400   18.3400 -112.8900       5.0       143       123       100
VIS    2025250     91400   18.3300 -112.9100       4.5       137       125       100
VIS    2025250     91400   18.3300 -112.9500       4.8       134       122        99
VIS    2025250     91400   18.3300 -112.9500       4.9       134       122        97
VIS    2025250     91400   18.3300 -113.0100       5.4       138       123        99
VIS    2025250     91400   18.3400 -113.1600       5.0       128       128        97
VIS    2025250     91400   18.3200 -113.2700       5.8       126       133        94
VIS    2025250     91400   18.3200 -113.2700       5.9       126       133        93
VIS    2025250     91400   18.3300 -113.3300       6.2       125       143        96
VIS    2025250     91400   18.3300 -113.4300       9.0       118       157        90
VIS    2025250     91400   18.3300 -113.4600       6.0       145       160        90
VIS    2025250     91400   18.3100 -113.5000      13.3       187       157       100
VIS    2025250     91400   18.3200 -113.9200       4.6       147       140       100
VIS    2025250     91400   18.3100 -113.9400       4.5       146       139       100
VIS    2025250     91400   18.3100 -113.9600       4.7       148       133        99
VIS    2025250     91400   18.3200 -114.0100       4.1       145       138        95
VIS    2025250     91400   18.3100 -114.3200       4.5       255       155        96
VIS    2025250     91400   18.2900 -114.3500       4.6       252       153       100
VIS    2025250     91400   18.2900 -114.3700       4.7       250       154        99
VIS    2025250     91400   18.2900 -114.3900       5.0       248       156        99
VIS    2025250     91400   18.3100 -114.4200       5.9       242       160        99
VIS    2025250     91400   18.2900 -114.4600       5.7       248       154        98
VIS    2025250     91400   18.2800 -114.4700       5.1       250       153        99
VIS    2025250     91400   18.2900 -114.6000       7.9       221       170       100
VIS    2025250     91400   18.2900 -114.6400       7.7       230       169        97
VIS    2025250     91400   18.2900 -114.6600       6.5       231       169        93
VIS    2025250     91400   18.2800 -114.6900       5.1       228       172        99
VIS    2025250     91400   18.2800 -114.8600       5.7       238       178       100
VIS    2025250     91400   18.2800 -114.8700       6.2       234       178        99
VIS    2025250     91400   18.2900 -114.9200       5.5       236       185       100
VIS    2025250     91400   18.2800 -115.5300       5.4       209       178        99
VIS    2025250     91400   18.2800 -115.5400       4.5       209       178        97
VIS    2025250     91400   18.2400 -116.7600       7.5       351       158       100
VIS    2025250     91400   18.2300 -116.8200       4.3       341       155        94
VIS    2025250     91400   18.2200 -116.9800       5.9        15       159        99
VIS    2025250     91400   18.2200 -116.9800       5.8        14       159        97
VIS    2025250     91400   18.2200 -117.1000       8.2        16       172       100
VIS    2025250     91400   18.1900 -118.1500       6.9        38       183        96
VIS    2025250     91400   18.2100 -118.1700      10.2        47       169        92
VIS    2025250     91400   18.2000 -118.1900       9.7        44       170        90
VIS    2025250     91400   18.2100 -118.2300      12.5        34       157       100
VIS    2025250     91400   18.2100 -118.2300      13.2        30       157        98
VIS    2025250     91400   18.1900 -118.2900      12.0        11       163       100
VIS    2025250     91400   18.1800 -118.3000      10.0        16       166        97
VIS    2025250     91400   18.2000 -118.3200      10.3        14       166       100
VIS    2025250     91400   18.2000 -118.3900       5.7       357       179       100
VIS    2025250     91400   18.1700 -119.1700      15.1        29       168        98
VIS    2025250     91400   18.1600 -119.1800      15.0        29       168        98
VIS    2025250     91400   18.1600 -119.2300      17.3        33       157       100
VIS    2025250     91400   18.1800 -119.2500      15.8        32       157        92
VIS    2025250     91400   18.1800 -119.2800      13.4        26       155       100
VIS    2025250     91400   18.1700 -119.2900      13.3        26       155       100
VIS    2025250     91400   18.1700 -119.3300      12.3        29       157       100
VIS    2025250     91400   18.4300 -108.8200      13.9        85       119        96
VIS    2025250     91400   18.4400 -108.8600      13.0        79       119        96
VIS    2025250     91400   18.4300 -109.1000      13.3        81       114        96
VIS    2025250     91400   18.4400 -109.1200      12.1        78       114        98
VIS    2025250     91400   18.4300 -109.2600       6.5        55       151        92
VIS    2025250     91400   18.4400 -109.2900       8.3        60       182        97
VIS    2025250     91400   18.4000 -110.3000      10.5        55       160        97
VIS    2025250     91400   18.3800 -110.3800      12.3        67       164       100
VIS    2025250     91400   18.3900 -110.4100      12.0        72       161       100
VIS    2025250     91400   18.3900 -110.4400      11.6        72       160        93
VIS    2025250     91400   18.3900 -110.4600      11.6        35       154        90
VIS    2025250     91400   18.3900 -110.5000      10.5        64       159        97
VIS    2025250     91400   18.3800 -110.5200      10.5        65       157       100
VIS    2025250     91400   18.3900 -110.5400      11.0        62       156        96
VIS    2025250     91400   18.4000 -110.5900      11.5        70       150        92
VIS    2025250     91400   18.3800 -110.7300      11.5        88       140        99
VIS    2025250     91400   18.3900 -110.7500      11.4        84       137       100
VIS    2025250     91400   18.3900 -110.7900      11.1        81       139       100
VIS    2025250     91400   18.3700 -110.8200      10.5        81       143        99
VIS    2025250     91400   18.3700 -110.8500      10.6        79       147        97
VIS    2025250     91400   18.3700 -110.8800      10.9        77       150        95
VIS    2025250     91400   18.3700 -110.9800      10.6        74       155        94
VIS    2025250     91400   18.3700 -111.0400       7.9        44       155        95
VIS    2025250     91400   18.3600 -111.0600       7.7        45       153        96
VIS    2025250     91400   18.3600 -111.1400      11.1        84       152        92
VIS    2025250     91400   18.3700 -111.2800      11.7        84       136        94
VIS    2025250     91400   18.3700 -111.3100      11.8        83       133       100
VIS    2025250     91400   18.3700 -111.3200      11.4        82       131       100
VIS    2025250     91400   18.3600 -111.3700       7.8        82       123        98
VIS    2025250     91400   18.3500 -111.3900       7.2        79       122        96
VIS    2025250     91400   18.3700 -111.4300       7.3        87       126       100
VIS    2025250     91400   18.3500 -111.6100       9.9        70       112        94
VIS    2025250     91400   18.3500 -111.6200      10.0        75       112       100
VIS    2025250     91400   18.3600 -111.6500      13.1        85       113        94
VIS    2025250     91400   18.3400 -111.9300       6.1        94       143       100
VIS    2025250     91400   18.3500 -111.9300       6.1        90       143       100
VIS    2025250     91400   18.3400 -111.9700       5.8        96       149        97
VIS    2025250     91400   18.3500 -112.0000       6.0        99       152       100
VIS    2025250     91400   18.3500 -112.0600       4.8       100       153        90
VIS    2025250     91400   18.3400 -112.1900       6.5       102       149        96
VIS    2025250     91400   18.3400 -112.2900       8.5       113       141        98
VIS    2025250     91400   18.3300 -112.3400       4.1        94       142        98
VIS    2025250     91400   18.3400 -112.3700       4.1       126       142        99
VIS    2025250     91400   18.3400 -112.3700       4.2       130       142        98
VIS    2025250     91400   18.3400 -112.4100       4.7       139       142        98
VIS    2025250     91400   18.3400 -112.5400       5.2       106       133       100
VIS    2025250     91400   18.3400 -112.5500       5.3       108       133       100
VIS    2025250     91400   18.3100 -112.7800       5.1       122       122       100
VIS    2025250     91400   18.3200 -112.7800       5.6       125       122       100
VIS    2025250     91400   18.3100 -112.8300       5.2       122       122       100
VIS    2025250     91400   18.3100 -112.8600       4.8       123       129        95
VIS    2025250     91400   18.3200 -112.8900       4.4       134       129        90
VIS    2025250     91400   18.3200 -112.9000       4.4       135       127        97
VIS    2025250     91400   18.3200 -112.9500       5.0       131       122        95
VIS    2025250     91400   18.3200 -112.9600       5.2       131       122        91
VIS    2025250     91400   18.3200 -113.0000       5.9       140       122        98
VIS    2025250     91400   18.3000 -113.1900       4.4       122       127        99
VIS    2025250     91400   18.3000 -113.2900       5.6       127       135        91
VIS    2025250     91400   18.2900 -113.3300       5.6       126       142        90
VIS    2025250     91400   18.3100 -113.5000      13.3       187       157       100
VIS    2025250     91400   18.2900 -113.9500       4.4       148       133        99
VIS    2025250     91400   18.2900 -114.2800       4.0       280       132       100
VIS    2025250     91400   18.2600 -114.3300       4.3       270       150        99
VIS    2025250     91400   18.2700 -114.3400       4.4       261       152       100
VIS    2025250     91400   18.2700 -114.3600       4.5       258       152        99
VIS    2025250     91400   18.2800 -114.3900       4.8       252       156        99
VIS    2025250     91400   18.2600 -114.4200       4.8       257       154        99
VIS    2025250     91400   18.2800 -114.4500       5.4       249       154       100
VIS    2025250     91400   18.2800 -114.4800       5.0       251       153       100
VIS    2025250     91400   18.2600 -114.5100       4.6       252       152        99
VIS    2025250     91400   18.2600 -114.5400       5.1       239       159        98
VIS    2025250     91400   18.2600 -114.5900       5.5       236       167        96
VIS    2025250     91400   18.2600 -114.5900       5.7       235       167        98
VIS    2025250     91400   18.2700 -114.6300       7.1       232       170       100
VIS    2025250     91400   18.2600 -114.6500       6.3       236       171       100
VIS    2025250     91400   18.2500 -114.6800       4.4       253       173        91
VIS    2025250     91400   18.2500 -114.8400       4.8       238       173       100
VIS    2025250     91400   18.2500 -114.8500       4.9       237       175       100
VIS    2025250     91400   18.2600 -114.8700       5.8       232       176       100
VIS    2025250     91400   18.2600 -114.9200       6.1       233       183        97
VIS    2025250     91400   18.2600 -114.9300       6.0       233       183        97
VIS    2025250     91400   18.2600 -115.0100       4.1       231       180        99
VIS    2025250     91400   18.2300 -115.7100       5.6        32       160        99
VIS    2025250     91400   18.2400 -115.7100       5.3        30       160        94
VIS    2025250     91400   18.2200 -116.3900       6.8       131       180        92
VIS    2025250     91400   18.1900 -116.9700       5.3        25       161        91
VIS    2025250     91400   18.2000 -117.0800       8.4        17       168       100
VIS    2025250     91400   18.2000 -117.1200       8.5        17       172       100
VIS    2025250     91400   18.2100 -117.1200       8.3        17       173        99
VIS    2025250     91400   18.1800 -118.1400       5.5        38       184       100
VIS    2025250     91400   18.1800 -118.1800       8.0        36       176        95
VIS    2025250     91400   18.1600 -118.2600       4.5       108       170        96
VIS    2025250     91400   18.1700 -118.2900      11.9        10       166       100
VIS    2025250     91400   18.1700 -118.3000      10.1        16       167        99
VIS    2025250     91400   18.1700 -118.3200       8.6        21       170        95
VIS    2025250     91400   18.1700 -118.3600       7.0         6       175        98
VIS    2025250     91400   18.1700 -118.3900       7.2         1       179        98
VIS    2025250     91400   18.1500 -119.1900      15.2        28       168        97
VIS    2025250     91400   18.1400 -119.2300      15.7        25       157        93
VIS    2025250     91400   18.1600 -119.2800      13.2        25       155       100
VIS    2025250     91400   18.1600 -119.2900      13.2        25       155       100
VIS    2025250     91400   18.1400 -119.3300      12.7        29       153       100
VIS    2025250     91400   18.4300 -108.8300      13.6        80       119        92
VIS    2025250     91400   18.4300 -108.8600      12.9        77       119       100
VIS    2025250     91400   18.4100 -109.1000      12.8        77       114       100
VIS    2025250     91400   18.4000 -109.2900       9.0        54       154        95
VIS    2025250     91400   18.3900 -109.3100       8.9        57       153        99
VIS    2025250     91400   18.3800 -110.4300      11.7        71       161        99
VIS    2025250     91400   18.3600 -110.5100       9.8        70       157       100
VIS    2025250     91400   18.3700 -110.5100       9.9        69       157       100
VIS    2025250     91400   18.3500 -110.5500       9.5        65       153       100
VIS    2025250     91400   18.3600 -110.6200      11.8        48       151        98
VIS    2025250     91400   18.3600 -110.7800      11.8        79       139        96
VIS    2025250     91400   18.3600 -110.7800      11.2        81       139       100
VIS    2025250     91400   18.3400 -110.8200      10.3        81       142        99
VIS    2025250     91400   18.3400 -110.8500      10.5        79       140        98
VIS    2025250     91400   18.3500 -110.9200      10.1        76       151        90
VIS    2025250     91400   18.3400 -110.9300      10.1        76       151        97
VIS    2025250     91400   18.3400 -110.9900      12.1        78       153       100
VIS    2025250     91400   18.3600 -110.9900      10.8        72       156        99
VIS    2025250     91400   18.3600 -111.0400       7.6        20       153        98
VIS    2025250     91400   18.3400 -111.1500      10.7        84       152        91
VIS    2025250     91400   18.3400 -111.1700       9.8        80       152        95
VIS    2025250     91400   18.3400 -111.2200       8.2        47       147        98
VIS    2025250     91400   18.3300 -111.2600      11.7        77       135        91
VIS    2025250     91400   18.3400 -111.3600       7.9        78       122        99
VIS    2025250     91400   18.3400 -111.4000       6.9        78       122        93
VIS    2025250     91400   18.3400 -111.4100       6.7        77       121        91
VIS    2025250     91400   18.3300 -111.4900       7.4        81       120        92
VIS    2025250     91400   18.3300 -111.6100       9.6        70       112        95
VIS    2025250     91400   18.3400 -111.6300       9.9        75       112       100
VIS    2025250     91400   18.3400 -111.6400      10.7        79       112        99
VIS    2025250     91400   18.3100 -111.9400       4.8       108       145        91
VIS    2025250     91400   18.3100 -111.9800       5.5       120       151        94
VIS    2025250     91400   18.3200 -112.0100       6.7       130       152        91
VIS    2025250     91400   18.3000 -112.1700      10.7        92       144       100
VIS    2025250     91400   18.3200 -112.1900       8.0       107       142        91
VIS    2025250     91400   18.3200 -112.2000       7.7       107       142        94
VIS    2025250     91400   18.3000 -112.3400       4.5        97       137        94
VIS    2025250     91400   18.3100 -112.4000       4.7       137       141        97
VIS    2025250     91400   18.3000 -112.4300       5.0       132       142        92
VIS    2025250     91400   18.2800 -112.8000       5.0       121       124        92
VIS    2025250     91400   18.2900 -112.8300       5.0       118       128        97
VIS    2025250     91400   18.3000 -112.8600       4.9       118       130        96
VIS    2025250     91400   18.2800 -112.8800       5.4       117       131        93
VIS    2025250     91400   18.3000 -112.9300       4.5       124       125        90
VIS    2025250     91400   18.2700 -113.1000       4.9       117       134        93
VIS    2025250     91400   18.2800 -113.1300       6.1       109       131        98
VIS    2025250     91400   18.2800 -113.1400       6.2       109       131        99
VIS    2025250     91400   18.2900 -113.1900       4.6       120       128        98
VIS    2025250     91400   18.2900 -113.1900       4.5       120       128       100
VIS    2025250     91400   18.2800 -113.2800       4.8       125       139        94
VIS    2025250     91400   18.2800 -113.2800       4.9       126       140        92
VIS    2025250     91400   18.2700 -113.3200       4.7       121       141        93
VIS    2025250     91400   18.2900 -113.3400       5.6       126       142        90
VIS    2025250     91400   18.2800 -113.4200       9.4       110       146        98
VIS    2025250     91400   18.2700 -113.6300       4.5       114       158        99
VIS    2025250     91400   18.2600 -113.6600       4.2       134       155        98
VIS    2025250     91400   18.2600 -113.6900       4.4       161       150        98
VIS    2025250     91400   18.2400 -114.3000       4.2       279       138        99
VIS    2025250     91400   18.2500 -114.3600       4.4       270       152       100
VIS    2025250     91400   18.2400 -114.4100       4.6       265       153       100
VIS    2025250     91400   18.2600 -114.4200       4.7       258       154        99
VIS    2025250     91400   18.2500 -114.4800       4.7       256       151       100
VIS    2025250     91400   18.2500 -114.5000       4.6       254       151       100
VIS    2025250     91400   18.2300 -114.5300       4.7       260       158        95
VIS    2025250     91400   18.2300 -114.5400       4.8       258       160        95
VIS    2025250     91400   18.2500 -114.5800       5.5       239       164        97
VIS    2025250     91400   18.2500 -114.5900       5.8       240       167        99
VIS    2025250     91400   18.2500 -114.6400       5.8       243       173       100
VIS    2025250     91400   18.2400 -114.6700       4.4       251       174        91
VIS    2025250     91400   18.2400 -114.6800       4.3       253       174        92
VIS    2025250     91400   18.2300 -114.8200       4.4       246       171        91
VIS    2025250     91400   18.2400 -114.8400       5.1       237       172       100
VIS    2025250     91400   18.2400 -114.8500       5.1       237       173       100
VIS    2025250     91400   18.2300 -114.8800       6.0       234       176        99
VIS    2025250     91400   18.2400 -114.9300       6.1       230       180        95
VIS    2025250     91400   18.2400 -114.9300       6.2       229       180        94
VIS    2025250     91400   18.2400 -115.0100       4.3       228       184        98
VIS    2025250     91400   18.2400 -115.0400       4.1       247       185        99
VIS    2025250     91400   18.1800 -116.7700       4.3       351       147        96
VIS    2025250     91400   18.1800 -116.7700       4.4       350       147        94
VIS    2025250     91400   18.1900 -117.0700       8.5        18       165        97
VIS    2025250     91400   18.1800 -117.1200       8.7        16       172       100
VIS    2025250     91400   18.1700 -117.1300       9.1        13       176        99
VIS    2025250     91400   18.1600 -118.2600       4.5       110       174        97
VIS    2025250     91400   18.1600 -118.3100      10.1        16       169        98
VIS    2025250     91400   18.1500 -118.3500       9.0        13       174        96
VIS    2025250     91400   18.1300 -118.3800       8.4        15       175       100
VIS    2025250     91400   18.1400 -118.3800       7.4        15       175        94
VIS    2025250     91400   18.1200 -119.2300      15.5        27       157       100
VIS    2025250     91400   18.1300 -119.2500      15.4        28       157       100
VIS    2025250     91400   18.1200 -119.2800      15.7        29       150        90
VIS    2025250     91400   18.1200 -119.3000      14.4        28       150        99
VIS    2025250     91400   18.1100 -119.3300      12.7        28       150       100
VIS    2025250     91400   18.3900 -108.8100      12.5        72       117        93
VIS    2025250     91400   18.3900 -108.8500      12.8        72       119        99
VIS    2025250     91400   18.4000 -108.8800      12.3        71       119       100
VIS    2025250     91400   18.3700 -109.0800      12.8        73       114        98
VIS    2025250     91400   18.3900 -109.0900      12.7        74       114        98
VIS    2025250     91400   18.3700 -109.2900       9.1        57       131       100
VIS    2025250     91400   18.3900 -109.3000       8.9        56       137        99
VIS    2025250     91400   18.3600 -109.3500       9.1        69       155        99
VIS    2025250     91400   18.3300 -110.4400      11.8        69       163        99
VIS    2025250     91400   18.3500 -110.4600      11.3        72       165        93
VIS    2025250     91400   18.3500 -110.5100       9.9        70       159        99
VIS    2025250     91400   18.3300 -110.5300       9.7        62       158        97
VIS    2025250     91400   18.3400 -110.5500       9.2        64       153       100
VIS    2025250     91400   18.3400 -110.6000      10.3        65       152        93
VIS    2025250     91400   18.3300 -110.6100      10.5        68       152        97
VIS    2025250     91400   18.3400 -110.6400      10.5        67       152        99
VIS    2025250     91400   18.3300 -110.7800      11.8        89       148        91
VIS    2025250     91400   18.3300 -110.7900      11.0        87       144        99
VIS    2025250     91400   18.3300 -110.8400      10.2        79       141       100
VIS    2025250     91400   18.3400 -110.8500      10.3        79       141        98
VIS    2025250     91400   18.3200 -110.8800      10.3        78       141        94
VIS    2025250     91400   18.3300 -110.9200      10.2        78       151        96
VIS    2025250     91400   18.3100 -110.9600      11.2        82       152       100
VIS    2025250     91400   18.3100 -111.0000      12.5        83       152       100
VIS    2025250     91400   18.3200 -111.0100      12.7        85       153       100
VIS    2025250     91400   18.3100 -111.0300      13.0        85       153       100
VIS    2025250     91400   18.3100 -111.1400      12.1        93       153       100
VIS    2025250     91400   18.3100 -111.1500      12.1        93       155       100
VIS    2025250     91400   18.3100 -111.2000       8.1        55       147       100
VIS    2025250     91400   18.3100 -111.2200       8.3        57       145        95
VIS    2025250     91400   18.3100 -111.2600      12.0        77       131        99
VIS    2025250     91400   18.3100 -111.2700      12.2        77       131        99
VIS    2025250     91400   18.3100 -111.3100      12.5        77       128        95
VIS    2025250     91400   18.3000 -111.3400       8.5        69       120        90
VIS    2025250     91400   18.3100 -111.6900      10.2        90       113        93
VIS    2025250     91400   18.2900 -111.7700       6.2       105       114        99
VIS    2025250     91400   18.3000 -111.8000       7.8        92       132        99
VIS    2025250     91400   18.2900 -111.8400       8.3       107       151        95
VIS    2025250     91400   18.2900 -111.8700       8.4       123       151        96
VIS    2025250     91400   18.2800 -111.9000       7.1       125       150        90
VIS    2025250     91400   18.3000 -111.9400       4.6       105       150        93
VIS    2025250     91400   18.2900 -112.0000       5.7       117       152        94
VIS    2025250     91400   18.2800 -112.0100       5.5       106       152        99
VIS    2025250     91400   18.2800 -112.0600       5.1        90       152        98
VIS    2025250     91400   18.2900 -112.0800       4.8        91       152        95
VIS    2025250     91400   18.2800 -112.1000       6.2        89       152        97
VIS    2025250     91400   18.2800 -112.1300       9.3        91       145        98
VIS    2025250     91400   18.2800 -112.1600      10.6        93       139       100
VIS    2025250     91400   18.3000 -112.1900       9.7        96       139        98
VIS    2025250     91400   18.2800 -112.2400      11.5       116       134        94
VIS    2025250     91400   18.2700 -112.3000       5.5        99       130       100
VIS    2025250     91400   18.2800 -112.3200       5.1       102       132        99
VIS    2025250     91400   18.2700 -112.3300       5.0       106       135        99
VIS    2025250     91400   18.2700 -112.3600       4.9       101       137       100
VIS    2025250     91400   18.2700 -112.3900       4.8       100       139        95
VIS    2025250     91400   18.2700 -112.4500       6.0       135       138        91
VIS    2025250     91400   18.2600 -112.7700       5.3       130       128        97
VIS    2025250     91400   18.2700 -112.8200       4.7       113       128        94
VIS    2025250     91400   18.2700 -112.8200       4.7       113       128        94
VIS    2025250     91400   18.2700 -112.8800       5.4       113       135       100
VIS    2025250     91400   18.2600 -112.9100       5.9       105       129       100
VIS    2025250     91400   18.2500 -112.9200       6.2       106       127       100
VIS    2025250     91400   18.2700 -112.9600       6.1       115       124        97
VIS    2025250     91400   18.2600 -112.9900       5.0       114       124        99
VIS    2025250     91400   18.2500 -113.0100       4.7       106       128       100
VIS    2025250     91400   18.2600 -113.0300       4.5       108       133        98
VIS    2025250     91400   18.2500 -113.0800       4.5       118       140        99
VIS    2025250     91400   18.2600 -113.1100       4.5       120       135        95
VIS    2025250     91400   18.2600 -113.2700       4.6       125       140        95
VIS    2025250     91400   18.2400 -113.3100       4.5       114       141        91
VIS    2025250     91400   18.2600 -113.3100       4.7       121       141        94
VIS    2025250     91400   18.2400 -113.4300       7.3       113       152        96
VIS    2025250     91400   18.2400 -113.5100       4.5       110       153        97
VIS    2025250     91400   18.2500 -113.5600       4.1       103       156        99
VIS    2025250     91400   18.2400 -113.6000       5.1       116       158       100
VIS    2025250     91400   18.2500 -113.6200       4.7       115       159       100
VIS    2025250     91400   18.2500 -113.6900       4.4       158       152        98
VIS    2025250     91400   18.2300 -114.3000       4.1       278       134       100
VIS    2025250     91400   18.2300 -114.4100       4.6       265       153       100
VIS    2025250     91400   18.2300 -114.4300       4.6       262       153       100
VIS    2025250     91400   18.2100 -114.4800       4.7       264       150       100
VIS    2025250     91400   18.2100 -114.5100       4.7       269       153        96
VIS    2025250     91400   18.2300 -114.5400       4.7       262       158        96
VIS    2025250     91400   18.2300 -114.5400       4.7       260       162        95
VIS    2025250     91400   18.2100 -114.5700       4.1       267       164        99
VIS    2025250     91400   18.2100 -114.6100       4.2       261       168        98
VIS    2025250     91400   18.2300 -114.6300       5.1       252       171        99
VIS    2025250     91400   18.2200 -114.6700       4.6       251       174        95
VIS    2025250     91400   18.2000 -114.7400       4.8       249       171        97
VIS    2025250     91400   18.2000 -114.7600       4.7       242       171        98
VIS    2025250     91400   18.2000 -114.8700       5.0       249       172        99
VIS    2025250     91400   18.2000 -114.9000       4.9       244       176        99
VIS    2025250     91400   18.2000 -114.9300       4.7       237       176        96
VIS    2025250     91400   18.2100 -114.9400       4.9       234       179        95
VIS    2025250     91400   18.1800 -115.6200       4.3       233       178        98
VIS    2025250     91400   18.1600 -116.5000       4.1       338       175        91
VIS    2025250     91400   18.1700 -116.5400       7.9        26       166        92
VIS    2025250     91400   18.1700 -116.7400       8.1        15       147        91
VIS    2025250     91400   18.1500 -116.8500       5.7        18       156        96
VIS    2025250     91400   18.1600 -116.8700       6.2        11       156       100
VIS    2025250     91400   18.1700 -116.8800       6.3        13       157        94
VIS    2025250     91400   18.1100 -118.3000       6.5        29       172        98
VIS    2025250     91400   18.1200 -118.3800       9.7        15       174       100
VIS    2025250     91400   18.1100 -118.3900       9.6        17       174        99
VIS    2025250     91400   18.1000 -119.2400      15.8        28       156       100
VIS    2025250     91400   18.1100 -119.2800      15.6        29       148        91
VIS    2025250     91400   18.0900 -119.3200      13.9        31       144       100
VIS    2025250     91400   18.3800 -108.5900       8.8        84       127        94
VIS    2025250     91400   18.3600 -108.6300       9.0        71       129        97
VIS    2025250     91400   18.3700 -108.9000       8.4        93       119       100
VIS    2025250     91400   18.3700 -109.0900      12.9        73       114        98
VIS    2025250     91400   18.3700 -109.1200      12.7        75       114        94
VIS    2025250     91400   18.3600 -109.1400       8.9        66       119       100
VIS    2025250     91400   18.3400 -109.2800      11.3        64       117        99
VIS    2025250     91400   18.3400 -109.3300      10.4        65       126        97
VIS    2025250     91400   18.3600 -109.3500       9.2        69       155        99
VIS    2025250     91400   18.3400 -109.3900       8.7        66       161        98
VIS    2025250     91400   18.3400 -109.4600       7.5        60       178        96
VIS    2025250     91400   18.3300 -109.4900       7.4        58       184        92
VIS    2025250     91400   18.3200 -110.4200      11.6        64       163       100
VIS    2025250     91400   18.3000 -110.4600      11.8        72       164       100
VIS    2025250     91400   18.3200 -110.4600      11.7        72       168        97
VIS    2025250     91400   18.3100 -110.5100       9.9        60       165        95
VIS    2025250     91400   18.3100 -110.5300       9.7        59       165        96
VIS    2025250     91400   18.3100 -110.5800      12.3        80       152       100
VIS    2025250     91400   18.3000 -110.6300      11.3        73       152        92
VIS    2025250     91400   18.3100 -110.6400      10.7        73       151       100
VIS    2025250     91400   18.3000 -110.8100      12.4        73       145        97
VIS    2025250     91400   18.3100 -110.8500      10.5        78       141        99
VIS    2025250     91400   18.3100 -110.8700      10.2        78       141        96
VIS    2025250     91400   18.2900 -110.9000       9.0        73       144        97
VIS    2025250     91400   18.2900 -110.9300       9.1        71       149        98
VIS    2025250     91400   18.3000 -110.9500      10.1        77       151       100
VIS    2025250     91400   18.2900 -110.9900      12.5        82       152       100
VIS    2025250     91400   18.2900 -111.0100      12.6        83       152        99
VIS    2025250     91400   18.2900 -111.0400      13.0        85       153        99
VIS    2025250     91400   18.2900 -111.1000      10.1        81       152       100
VIS    2025250     91400   18.2800 -111.1400      12.2        92       150       100
VIS    2025250     91400   18.3000 -111.1500      12.3        93       152       100
VIS    2025250     91400   18.2800 -111.2000       8.7        48       145        98
VIS    2025250     91400   18.3000 -111.2600      11.9        77       131        98
VIS    2025250     91400   18.3000 -111.2700      12.2        77       130        99
VIS    2025250     91400   18.2900 -111.3100      12.5        75       128        94
VIS    2025250     91400   18.2800 -111.3600       7.5        82       116       100
VIS    2025250     91400   18.2800 -111.3700       6.8        83       116       100
VIS    2025250     91400   18.2900 -111.4000       5.6        78       116        97
VIS    2025250     91400   18.2800 -111.4500       6.2        82       114        92
VIS    2025250     91400   18.2900 -111.5600       8.2        82       110        90
VIS    2025250     91400   18.2800 -111.8500       8.3       108       151        95
VIS    2025250     91400   18.2800 -111.8700       8.3       124       150        95
VIS    2025250     91400   18.2600 -111.9000       7.3       122       150        90
VIS    2025250     91400   18.2600 -111.9700       5.1       122       154        98
VIS    2025250     91400   18.2600 -111.9800       5.2       114       153        99
VIS    2025250     91400   18.2600 -112.0400       4.6        77       151        99
VIS    2025250     91400   18.2600 -112.0500       4.5        75       150        97
VIS    2025250     91400   18.2600 -112.0900       5.6        97       150        92
VIS    2025250     91400   18.2700 -112.1500      10.1        96       137       100
VIS    2025250     91400   18.2700 -112.1600      10.3        95       137       100
VIS    2025250     91400   18.2700 -112.2000      10.0        99       133        96
VIS    2025250     91400   18.2500 -112.2200       9.0       103       133        95
VIS    2025250     91400   18.2500 -112.2700       5.7       105       127        96
VIS    2025250     91400   18.2500 -112.2800       5.7       105       127        96
VIS    2025250     91400   18.2500 -112.3200       5.4       111       131       100
VIS    2025250     91400   18.2700 -112.3400       5.1       108       135       100
VIS    2025250     91400   18.2500 -112.3600       5.4       105       136        98
VIS    2025250     91400   18.2400 -112.4000       6.2       102       135        94
VIS    2025250     91400   18.2400 -112.4600       6.7       133       131        96
VIS    2025250     91400   18.2400 -112.4800       6.4       139       133        97
VIS    2025250     91400   18.2500 -112.7300       5.6       135       139        95
VIS    2025250     91400   18.2500 -112.7500       5.4       136       139        99
VIS    2025250     91400   18.2400 -112.7900       5.7       125       131        99
VIS    2025250     91400   18.2500 -112.8100       5.2       123       131       100
VIS    2025250     91400   18.2300 -112.8300       5.0       109       138       100
VIS    2025250     91400   18.2300 -112.8700       4.4       104       135       100
VIS    2025250     91400   18.2400 -112.9000       5.3       107       129       100
VIS    2025250     91400   18.2300 -112.9200       4.9       107       129        97
VIS    2025250     91400   18.2300 -112.9500       5.4       104       136        96
VIS    2025250     91400   18.2300 -113.0000       5.1       108       139       100
VIS    2025250     91400   18.2500 -113.0100       4.7       106       129       100
VIS    2025250     91400   18.2400 -113.0800       4.5       120       141       100
VIS    2025250     91400   18.2300 -113.1000       4.4       116       140        99
VIS    2025250     91400   18.2300 -113.1200       4.4       117       138        99
VIS    2025250     91400   18.2200 -113.3500       5.9       111       138        99
VIS    2025250     91400   18.2300 -113.4300       6.8       120       152       100
VIS    2025250     91400   18.2100 -113.4500       6.9       125       154        99
VIS    2025250     91400   18.2300 -113.4800       5.7       121       156        99
VIS    2025250     91400   18.2300 -113.5100       4.4       112       155        99
VIS    2025250     91400   18.2300 -113.5500       4.0       102       156       100
VIS    2025250     91400   18.2200 -113.5800       6.1       117       158       100
VIS    2025250     91400   18.2100 -113.6100       5.8       113       163        99
VIS    2025250     91400   18.2300 -113.6400       4.8       123       163        92
VIS    2025250     91400   18.2000 -114.5100       4.6       269       153        95
VIS    2025250     91400   18.2000 -114.5200       4.5       270       158        96
VIS    2025250     91400   18.2000 -114.5600       4.0       272       162        96
VIS    2025250     91400   18.1900 -114.5900       4.0       268       162        99
VIS    2025250     91400   18.2000 -114.6700       4.1       240       173        99
VIS    2025250     91400   18.1800 -114.7000       5.2       236       172        98
VIS    2025250     91400   18.1900 -114.7400       4.9       242       171        97
VIS    2025250     91400   18.1800 -114.7600       4.6       243       171        99
VIS    2025250     91400   18.1900 -114.8000       4.3       251       170        99
VIS    2025250     91400   18.2000 -114.8200       4.9       253       168        96
VIS    2025250     91400   18.1900 -114.9000       4.6       248       176        99
VIS    2025250     91400   18.1700 -115.6200       4.3       235       177        97
VIS    2025250     91400   18.1600 -115.8900       4.0       346       181        97
VIS    2025250     91400   18.1500 -116.5000       4.4       339       175        99
VIS    2025250     91400   18.1400 -116.6400       4.1       350       163        98
VIS    2025250     91400   18.1400 -116.7700       5.6         9       154        96
VIS    2025250     91400   18.1400 -116.7800       5.6         9       154        97
VIS    2025250     91400   18.1300 -116.8600       5.6        16       156        90
VIS    2025250     91400   18.1400 -116.8800       6.3         1       160        99
VIS    2025250     91400   18.1300 -116.9300       7.5       342       164        95
VIS    2025250     91400   18.1200 -116.9500       9.1       339       164        91
VIS    2025250     91400   18.1300 -116.9800       8.7       327       165        98
VIS    2025250     91400   18.1300 -117.1500       9.7        10       177        99
VIS    2025250     91400   18.1000 -118.1200       5.6        58       186        97
VIS    2025250     91400   18.1100 -118.3000       6.3        30       173       100
VIS    2025250     91400   18.0900 -118.3200       7.3        23       173        98
VIS    2025250     91400   18.1000 -118.3300       8.0        22       172        95
VIS    2025250     91400   18.0700 -119.2200      15.8        30       156        99
VIS    2025250     91400   18.0700 -119.2600      15.7        29       144        99
VIS    2025250     91400   18.0700 -119.2800      14.4        29       137        99
VIS    2025250     91400   18.0700 -119.3200      13.5        32       144        99
VIS    2025250     91400   18.0600 -119.3400      13.4        31       144       100
VIS    2025250     91400   18.3500 -108.6300       9.1        69       132        94
VIS    2025250     91400   18.3500 -108.6400       9.2        66       132        94
VIS    2025250     91400   18.3300 -108.7300      13.1        72       123        93
VIS    2025250     91400   18.3500 -108.7500      12.6        76       120        97
VIS    2025250     91400   18.3400 -109.1900       9.2        60       120        91
VIS    2025250     91400   18.3300 -109.2800      11.9        66       117        99
VIS    2025250     91400   18.3300 -109.3000      12.1        65       117        98
VIS    2025250     91400   18.3400 -109.3300      10.7        66       126        96
VIS    2025250     91400   18.3300 -109.3500       9.9        68       144        97
VIS    2025250     91400   18.3100 -109.4100       8.5        71       159       100
VIS    2025250     91400   18.3100 -109.4400       8.2        72       161        99
VIS    2025250     91400   18.3100 -109.4400       8.2        72       161        99
VIS    2025250     91400   18.2900 -110.4000      11.9        64       161       100
VIS    2025250     91400   18.2900 -110.4100      11.9        64       163       100
VIS    2025250     91400   18.3000 -110.4600      11.8        71       164       100
VIS    2025250     91400   18.2900 -110.4800      10.8        66       165        99
VIS    2025250     91400   18.2800 -110.5000       8.5        54       162        90
VIS    2025250     91400   18.2900 -110.5400       8.5        54       162       100
VIS    2025250     91400   18.2800 -110.5600       7.9        48       157       100
VIS    2025250     91400   18.2900 -110.6100      11.9        79       152       100
VIS    2025250     91400   18.2800 -110.8300      12.8        76       145        93
VIS    2025250     91400   18.2900 -110.8800       9.2        72       141        93
VIS    2025250     91400   18.2700 -110.9000       8.8        79       143        97
VIS    2025250     91400   18.2600 -110.9400       8.9        78       148        92
VIS    2025250     91400   18.2700 -110.9500       8.6        75       148        99
VIS    2025250     91400   18.2700 -111.0200      12.6        82       152        95
VIS    2025250     91400   18.2800 -111.0400      13.0        85       153        99
VIS    2025250     91400   18.2700 -111.0900      10.9        80       152       100
VIS    2025250     91400   18.2800 -111.1500      12.3        92       147       100
VIS    2025250     91400   18.2600 -111.1700      12.7        93       144       100
VIS    2025250     91400   18.2600 -111.2100       8.6        55       138       100
VIS    2025250     91400   18.2700 -111.2200       8.6        59       137       100
VIS    2025250     91400   18.2700 -111.2700      11.4        81       127        97
VIS    2025250     91400   18.2500 -111.3000      12.0        82       121        94
VIS    2025250     91400   18.2600 -111.3100      12.2        80       120        90
VIS    2025250     91400   18.2700 -111.3500       8.1        84       116        94
VIS    2025250     91400   18.2700 -111.3700       7.2        83       116        99
VIS    2025250     91400   18.2400 -111.5700       7.7        86       104        93
VIS    2025250     91400   18.2400 -111.5900       7.1        82       104        95
VIS    2025250     91400   18.2500 -111.7100       4.5       128       111        91
VIS    2025250     91400   18.2500 -111.8600       8.1       103       149       100
VIS    2025250     91400   18.2400 -111.9000       6.7       113       149        94
VIS    2025250     91400   18.2400 -112.0400       4.7        75       148        98
VIS    2025250     91400   18.2500 -112.0400       4.7        73       148        98
VIS    2025250     91400   18.2300 -112.0900       5.0        93       132       100
VIS    2025250     91400   18.2300 -112.1100       5.8       106       129        98
VIS    2025250     91400   18.2300 -112.1400       7.4       111       126        96
VIS    2025250     91400   18.2300 -112.1900       6.8       107       125        95
VIS    2025250     91400   18.2300 -112.1900       6.8       106       125        94
VIS    2025250     91400   18.2300 -112.2500       6.5       109       125        99
VIS    2025250     91400   18.2400 -112.2700       5.7       107       127        96
VIS    2025250     91400   18.2300 -112.2900       5.7       110       127        97
VIS    2025250     91400   18.2400 -112.3300       5.6       113       131       100
VIS    2025250     91400   18.2400 -112.3400       5.6       110       132       100
VIS    2025250     91400   18.2300 -112.4000       7.2       101       134        97
VIS    2025250     91400   18.2400 -112.4500       7.5       127       130        99
VIS    2025250     91400   18.2200 -112.4900       6.3       128       132        99
VIS    2025250     91400   18.2100 -112.7300       5.5       137       144        98
VIS    2025250     91400   18.2200 -112.7600       5.3       132       139        98
VIS    2025250     91400   18.2100 -112.8000       6.2       122       139       100
VIS    2025250     91400   18.2200 -112.8200       5.6       114       140       100
VIS    2025250     91400   18.2200 -112.8300       5.2       107       138       100
VIS    2025250     91400   18.2200 -112.8700       4.4       104       137        99
VIS    2025250     91400   18.2000 -112.9200       4.1       108       134        94
VIS    2025250     91400   18.2000 -112.9200       4.0       107       134        94
VIS    2025250     91400   18.2100 -112.9700       5.0       108       144        97
VIS    2025250     91400   18.2000 -112.9900       5.1       110       147        99
VIS    2025250     91400   18.2100 -113.0100       4.9       106       147       100
VIS    2025250     91400   18.2200 -113.0600       4.1       122       147        92
VIS    2025250     91400   18.2100 -113.0800       4.6       120       145        98
VIS    2025250     91400   18.2100 -113.1000       4.6       119       144        96
VIS    2025250     91400   18.2100 -113.3000       4.4       109       137        93
VIS    2025250     91400   18.2100 -113.3500       5.9       112       138        99
VIS    2025250     91400   18.2100 -113.3500       5.9       112       138        99
VIS    2025250     91400   18.2000 -113.4200       6.7       128       152       100
VIS    2025250     91400   18.2100 -113.4500       7.0       126       154        99
VIS    2025250     91400   18.1900 -113.4700       7.7       126       157        98
VIS    2025250     91400   18.1900 -113.5500       6.0       112       162        99
VIS    2025250     91400   18.1900 -113.5600       5.9       110       162       100
VIS    2025250     91400   18.1800 -113.6000       5.6       109       166        96
VIS    2025250     91400   18.1900 -113.6200       5.3       111       165       100
VIS    2025250     91400   18.1800 -114.4000       4.2       292       151       100
VIS    2025250     91400   18.1800 -114.5100       4.2       271       158        90
VIS    2025250     91400   18.1700 -114.5300       4.0       272       164        94
VIS    2025250     91400   18.1700 -114.5700       4.2       267       164        99
VIS    2025250     91400   18.1600 -114.6000       4.1       264       161        98
VIS    2025250     91400   18.1500 -114.6700       4.6       246       169        99
VIS    2025250     91400   18.1600 -114.7100       6.2       240       172        99
VIS    2025250     91400   18.1600 -114.7500       5.5       230       171        95
VIS    2025250     91400   18.1700 -114.7700       4.7       240       171        98
VIS    2025250     91400   18.1500 -114.7900       4.5       243       169       100
VIS    2025250     91400   18.1600 -114.8100       4.5       252       169       100
VIS    2025250     91400   18.1100 -116.5300       4.5        88       172        94
VIS    2025250     91400   18.1100 -116.5400       4.5        88       172        94
VIS    2025250     91400   18.1000 -116.7000       8.0       303       155        93
VIS    2025250     91400   18.1100 -116.7100       8.1       304       153        93
VIS    2025250     91400   18.1000 -116.9300       9.3       351       164        92
VIS    2025250     91400   18.0900 -117.0300       7.3        10       170        93
VIS    2025250     91400   18.0800 -118.3200       7.5        20       174        93
VIS    2025250     91400   18.0500 -119.2400      16.0        29       146        99
VIS    2025250     91400   18.0400 -119.2700      14.8        26       135        99
VIS    2025250     91400   18.0400 -119.3000      13.2        25       135        95
VIS    2025250     91400   18.0400 -119.3000      12.6        24       135        91
VIS    2025250     91400   18.0600 -119.3400      13.5        31       148       100
VIS    2025250     91400   18.3300 -108.5800       9.9        88       137        99
VIS    2025250     91400   18.3100 -108.6200       8.4        81       137        91
VIS    2025250     91400   18.3100 -108.7500      13.7        67       124       100
VIS    2025250     91400   18.3000 -109.2000       9.3        63       126        96
VIS    2025250     91400   18.3000 -109.2400      10.1        63       133       100
VIS    2025250     91400   18.3100 -109.2800      12.9        64       119       100
VIS    2025250     91400   18.2900 -109.3200      12.3        62       132        99
VIS    2025250     91400   18.2900 -109.3500      11.1        65       146        99
VIS    2025250     91400   18.2900 -109.3700       9.9        67       155       100
VIS    2025250     91400   18.2900 -109.4100       8.2        63       161       100
VIS    2025250     91400   18.2900 -109.4400       8.0        63       161        99
VIS    2025250     91400   18.2900 -109.4700       7.4        64       168        98
VIS    2025250     91400   18.2800 -109.4900       7.0        59       174        97
VIS    2025250     91400   18.2900 -109.5300       6.0        54       186        96
VIS    2025250     91400   18.3000 -109.5400       5.8        53       189        97
VIS    2025250     91400   18.2700 -110.4200      11.8        65       159       100
VIS    2025250     91400   18.2700 -110.4500      11.6        67       163        92
VIS    2025250     91400   18.2700 -110.5100       8.0        55       162        96
VIS    2025250     91400   18.2700 -110.5500       7.6        51       158       100
VIS    2025250     91400   18.2500 -110.5900       7.8        40       155       100
VIS    2025250     91400   18.2700 -110.6100       7.8        21       155        99
VIS    2025250     91400   18.2600 -110.6300       8.7        29       155        99
VIS    2025250     91400   18.2500 -110.8400      12.7        74       145        93
VIS    2025250     91400   18.2600 -110.8700      11.6        72       143        97
VIS    2025250     91400   18.2600 -110.8900       8.9        78       141        95
VIS    2025250     91400   18.2600 -110.9500       8.7        77       148        90
VIS    2025250     91400   18.2600 -111.0300      15.7        91       150        90
VIS    2025250     91400   18.2500 -111.0600      13.5        86       151       100
VIS    2025250     91400   18.2300 -111.0800      11.0        83       145        99
VIS    2025250     91400   18.2400 -111.1100      10.1        75       149        93
VIS    2025250     91400   18.2500 -111.1600      12.0        91       144        99
VIS    2025250     91400   18.2400 -111.1900       8.3        53       140        93
VIS    2025250     91400   18.2400 -111.2300       8.3        65       126       100
VIS    2025250     91400   18.2400 -111.2700      10.6        83       122        97
VIS    2025250     91400   18.2300 -111.3000      11.4        84       117        97
VIS    2025250     91400   18.2400 -111.3500      11.4        78       113        91
VIS    2025250     91400   18.2400 -111.3900       8.8        81       113       100
VIS    2025250     91400   18.2300 -111.4000       8.8        79       112        97
VIS    2025250     91400   18.2200 -111.6900       5.0       107       104        98
VIS    2025250     91400   18.2300 -111.7200       4.2       132       111        98
VIS    2025250     91400   18.2200 -111.7500       5.0       148       116       100
VIS    2025250     91400   18.2300 -111.7800       5.6       138       116        94
VIS    2025250     91400   18.2200 -111.8500       7.6        95       140        98
VIS    2025250     91400   18.2200 -111.8800       8.0        93       145       100
VIS    2025250     91400   18.2300 -111.9100       6.9       109       148        93
VIS    2025250     91400   18.2200 -112.0500       5.4        81       140        99
VIS    2025250     91400   18.2100 -112.0600       5.2        81       140       100
VIS    2025250     91400   18.2200 -112.0800       5.0        89       132       100
VIS    2025250     91400   18.2100 -112.1200       6.3       118       117       100
VIS    2025250     91400   18.2000 -112.1500       6.8       127       117        99
VIS    2025250     91400   18.2100 -112.1800       6.5       117       122        96
VIS    2025250     91400   18.2100 -112.2200       5.6       108       122        95
VIS    2025250     91400   18.2000 -112.2500       5.5       107       122        99
VIS    2025250     91400   18.2000 -112.2800       5.6       115       126        98
VIS    2025250     91400   18.2100 -112.3000       5.8       112       128        98
VIS    2025250     91400   18.2000 -112.3200       5.8       107       129        97
VIS    2025250     91400   18.2100 -112.4200       8.2        98       133       100
VIS    2025250     91400   18.2100 -112.4500       7.0       109       131       100
VIS    2025250     91400   18.2100 -112.4700       6.6       116       131       100
VIS    2025250     91400   18.2100 -112.4900       6.2       126       132        97
VIS    2025250     91400   18.2000 -112.7700       5.8       127       139       100
VIS    2025250     91400   18.1900 -112.7900       5.1       119       141        92
VIS    2025250     91400   18.1800 -112.8200       5.2       110       141        97
VIS    2025250     91400   18.2000 -112.8400       5.1       104       141        99
VIS    2025250     91400   18.2000 -112.8800       4.5       105       137        98
VIS    2025250     91400   18.1800 -112.9100       4.9       116       137        99
VIS    2025250     91400   18.1800 -112.9400       4.4       112       138        98
VIS    2025250     91400   18.1800 -112.9600       4.7       112       143        96
VIS    2025250     91400   18.2000 -112.9800       4.9       111       146        99
VIS    2025250     91400   18.1800 -113.0200       4.7       111       147        99
VIS    2025250     91400   18.2000 -113.0400       4.2       110       148        99
VIS    2025250     91400   18.1900 -113.0900       5.0       117       150        95
VIS    2025250     91400   18.1700 -113.1200       4.4       112       152        97
VIS    2025250     91400   18.1700 -113.3100       4.5       111       134        95
VIS    2025250     91400   18.1700 -113.3400       5.4       121       136        99
VIS    2025250     91400   18.1700 -113.3700       5.8       127       136        96
VIS    2025250     91400   18.1800 -113.3900       5.6       129       144        94
VIS    2025250     91400   18.1600 -113.4200       6.7       130       148        99
VIS    2025250     91400   18.1800 -113.4600       7.9       126       157        97
VIS    2025250     91400   18.1800 -113.4700       7.8       126       157        96
VIS    2025250     91400   18.1800 -113.5200       7.1       115       162        91
VIS    2025250     91400   18.1600 -113.5400       7.2       114       169        98
VIS    2025250     91400   18.1800 -113.5600       6.0       111       163       100
VIS    2025250     91400   18.1700 -113.6100       5.8       112       168        98
VIS    2025250     91400   18.1700 -113.6400       4.6       109       168        95
VIS    2025250     91400   18.1700 -113.7200       4.0       128       156        99
VIS    2025250     91400   18.1300 -114.5100       4.3       274       162        94
VIS    2025250     91400   18.1300 -114.6000       4.0       265       161        96
VIS    2025250     91400   18.1300 -114.6200       4.1       262       162        96
VIS    2025250     91400   18.1400 -114.6500       4.1       256       167        98
VIS    2025250     91400   18.1500 -114.6900       5.6       245       171        98
VIS    2025250     91400   18.1400 -114.7800       4.3       244       169        99
VIS    2025250     91400   18.1500 -114.7800       4.4       243       169       100
VIS    2025250     91400   18.1400 -114.8200       4.4       253       169        99
VIS    2025250     91400   18.1000 -115.9700       4.2       235       173        97
VIS    2025250     91400   18.1000 -116.4100       4.4        69       181        98
VIS    2025250     91400   18.0900 -116.4500       4.3        69       178        91
VIS    2025250     91400   18.1000 -116.7000       8.0       303       155        93
VIS    2025250     91400   18.0800 -116.8200       5.3       293       159        92
VIS    2025250     91400   18.0800 -116.9900       7.5        18       169       100
VIS    2025250     91400   18.0700 -117.0300       6.0         2       174        98
VIS    2025250     91400   18.0700 -117.0400       6.0         2       174        96
VIS    2025250     91400   18.0400 -118.1500       4.3        61       184        99
VIS    2025250     91400   18.0500 -118.1600       4.6        64       184        95
VIS    2025250     91400   18.0400 -118.2100       5.2        62       182        93
VIS    2025250     91400   18.0300 -119.2500      14.8        27       135        93
VIS    2025250     91400   18.0300 -119.2700      14.4        25       135        98
VIS    2025250     91400   18.0200 -119.3100      13.5        21       137        91
VIS    2025250     91400   18.0100 -119.3400      13.0        23       146       100
VIS    2025250     91400   18.0300 -119.3600      13.4        26       151        97
VIS    2025250     91400   18.2900 -108.7800      14.7        69       127       100
VIS    2025250     91400   18.2700 -109.2300      10.3        61       138        93
VIS    2025250     91400   18.2700 -109.2400      10.5        60       138        93
VIS    2025250     91400   18.2700 -109.2900      12.0        56       139        99
VIS    2025250     91400   18.2700 -109.3200      12.1        57       144        99
VIS    2025250     91400   18.2600 -109.3300      11.9        56       155        99
VIS    2025250     91400   18.2600 -109.3800      10.0        56       170        99
VIS    2025250     91400   18.2600 -109.4000       9.5        53       170       100
VIS    2025250     91400   18.2800 -109.4400       8.1        61       167        99
VIS    2025250     91400   18.2800 -109.4700       7.6        62       168        98
VIS    2025250     91400   18.2700 -109.4800       7.5        57       172        98
VIS    2025250     91400   18.2800 -109.5200       6.2        49       183        99
VIS    2025250     91400   18.2600 -109.5500       6.5        39       189       100
VIS    2025250     91400   18.2300 -110.4400      10.3        46       158        90
VIS    2025250     91400   18.2400 -110.5000       8.0        59       155        94
VIS    2025250     91400   18.2500 -110.5100       7.7        56       158        97
VIS    2025250     91400   18.2400 -110.5500       7.2        49       155       100
VIS    2025250     91400   18.2200 -110.6000       7.6        46       155        95
VIS    2025250     91400   18.2300 -110.6000       7.6        40       155        99
VIS    2025250     91400   18.2300 -110.6600       9.0        26       155        94
VIS    2025250     91400   18.2200 -110.8600      10.8        78       139       100
VIS    2025250     91400   18.2200 -110.8900      10.9        80       139       100
VIS    2025250     91400   18.2200 -110.9400      12.0        85       140        96
VIS    2025250     91400   18.2300 -110.9700      12.2        88       144        97
VIS    2025250     91400   18.2200 -111.0100       9.5        81       142        96
VIS    2025250     91400   18.2100 -111.0600      11.7        89       144       100
VIS    2025250     91400   18.2300 -111.0900      10.6        83       145        99
VIS    2025250     91400   18.2200 -111.1200       9.4        83       146        99
VIS    2025250     91400   18.2100 -111.1800       7.7        81       144        93
VIS    2025250     91400   18.2300 -111.2100       8.0        66       135       100
VIS    2025250     91400   18.2200 -111.2300       8.5        70       125        98
VIS    2025250     91400   18.2200 -111.2800      11.3        85       121        97
VIS    2025250     91400   18.2200 -111.2900      11.3        84       117        97
VIS    2025250     91400   18.2100 -111.3400      10.7        77       116        93
VIS    2025250     91400   18.2100 -111.4800       6.1        91       114        92
VIS    2025250     91400   18.2000 -111.5500       6.6        79       116        91
VIS    2025250     91400   18.1900 -111.5700       6.3        76       112        96
VIS    2025250     91400   18.1900 -111.6700       5.3        88       103       100
VIS    2025250     91400   18.2000 -111.6900       4.9        97       103       100
VIS    2025250     91400   18.1900 -111.7200       4.5       103       112       100
VIS    2025250     91400   18.2100 -111.7500       5.3       147       117        93
VIS    2025250     91400   18.2100 -111.8500       7.7        94       140        98
VIS    2025250     91400   18.2100 -111.8800       8.1        94       141        99
VIS    2025250     91400   18.1900 -112.0000       5.5        74       135        98
VIS    2025250     91400   18.1800 -112.0500       4.9        82       126        95
VIS    2025250     91400   18.1800 -112.1400       6.9       126       117        92
VIS    2025250     91400   18.1800 -112.1500       6.9       126       117        94
VIS    2025250     91400   18.1900 -112.1900       6.4       123       122        90
VIS    2025250     91400   18.1700 -112.2500       6.9        99       119        90
VIS    2025250     91400   18.1700 -112.2900       6.5       107       123        93
VIS    2025250     91400   18.1700 -112.2900       6.6       107       123        94
VIS    2025250     91400   18.1900 -112.3200       6.0       105       129        99
VIS    2025250     91400   18.1700 -112.3600       6.7       101       130        92
VIS    2025250     91400   18.1900 -112.4600       7.1       109       131       100
VIS    2025250     91400   18.1900 -112.4800       6.9       115       131       100
VIS    2025250     91400   18.1900 -112.5100       5.9       123       133        95
VIS    2025250     91400   18.1800 -112.5300       5.8       122       133       100
VIS    2025250     91400   18.1700 -112.7000       5.8       137       137        99
VIS    2025250     91400   18.1700 -112.7300       6.8       137       142        94
VIS    2025250     91400   18.1700 -112.7700       4.1       305       146        97
VIS    2025250     91400   18.1800 -112.8100       5.2       114       141        97
VIS    2025250     91400   18.1700 -112.8400       4.3       110       141        95
VIS    2025250     91400   18.1800 -112.8800       4.5       115       138        94
VIS    2025250     91400   18.1700 -112.9200       4.8       116       140       100
VIS    2025250     91400   18.1600 -112.9400       4.8       116       142       100
VIS    2025250     91400   18.1600 -112.9600       4.8       115       142        95
VIS    2025250     91400   18.1700 -113.0300       4.7       112       148        99
VIS    2025250     91400   18.1600 -113.0700       5.4       103       155        94
VIS    2025250     91400   18.1600 -113.0800       5.2       103       156        92
VIS    2025250     91400   18.1500 -113.1300       4.3       108       155        99
VIS    2025250     91400   18.1600 -113.1400       4.1       113       155        99
VIS    2025250     91400   18.1600 -113.3000       4.6       107       134        95
VIS    2025250     91400   18.1500 -113.3600       5.9       124       130        93
VIS    2025250     91400   18.1500 -113.3700       6.0       127       130        93
VIS    2025250     91400   18.1500 -113.3900       5.8       129       138        98
VIS    2025250     91400   18.1600 -113.4200       6.7       131       144        99
VIS    2025250     91400   18.1500 -113.4500       8.1       128       156        99
VIS    2025250     91400   18.1400 -113.5200       6.9       115       167        94
VIS    2025250     91400   18.1600 -113.5500       7.2       114       171        99
VIS    2025250     91400   18.1600 -113.5700       6.4       112       171       100
VIS    2025250     91400   18.1400 -113.7300       4.3       115       157       100
VIS    2025250     91400   18.1100 -114.4500       4.1       291       145        99
VIS    2025250     91400   18.1100 -114.4600       4.4       286       147        99
VIS    2025250     91400   18.1100 -114.5300       4.5       273       163        93
VIS    2025250     91400   18.1300 -114.5400       4.0       269       164        97
VIS    2025250     91400   18.1200 -114.5900       4.3       266       164        94
VIS    2025250     91400   18.1300 -114.5900       4.1       267       162        96
VIS    2025250     91400   18.1300 -114.6200       4.1       264       162        94
VIS    2025250     91400   18.1300 -114.6600       4.1       264       167        99
VIS    2025250     91400   18.1000 -114.6800       4.1       280       175       100
VIS    2025250     91400   18.1100 -114.7700       4.8       287       166        90
VIS    2025250     91400   18.1100 -114.8000       4.2       273       166        93
VIS    2025250     91400   18.0600 -116.3900       5.7        69       188        90
VIS    2025250     91400   18.0600 -116.9000       6.6       351       167        98
VIS    2025250     91400   18.0700 -116.9300       6.6         7       170        96
VIS    2025250     91400   18.0500 -116.9600       7.4        14       170        98
VIS    2025250     91400   18.0600 -117.0000       7.2         8       170        99
VIS    2025250     91400   18.0600 -117.0300       6.0         1       175        96
VIS    2025250     91400   18.0600 -117.0400       6.0         1       175        96
VIS    2025250     91400   18.0400 -118.0700       4.4       154       189        95
VIS    2025250     91400   18.0300 -118.2200       5.5        73       184        92
VIS    2025250     91400   18.0100 -119.2300      12.8        25       157       100
VIS    2025250     91400   17.9900 -119.2700      15.9        19       138        99
VIS    2025250     91400   18.0100 -119.3000      15.5        20       137       100
VIS    2025250     91400   17.9900 -119.3100      15.7        20       139       100
VIS    2025250     91400   17.9900 -119.3600      12.7        24       146       100
VIS    2025250     91400   18.0000 -119.3600      12.8        24       146       100
VIS    2025250     91400   18.2700 -108.6400       6.9        69       144        91
VIS    2025250     91400   18.2700 -108.6700       6.8        74       144        90
VIS    2025250     91400   18.2700 -108.7100       8.9        93       142       100
VIS    2025250     91400   18.2600 -108.7500       8.7        89       135        98
VIS    2025250     91400   18.2500 -108.9800      12.9        72       127        99
VIS    2025250     91400   18.2600 -109.0500       8.8        46       131        96
VIS    2025250     91400   18.2500 -109.0600       8.8        45       131        96
VIS    2025250     91400   18.2600 -109.2300      10.3        64       138        93
VIS    2025250     91400   18.2500 -109.2700      11.5        58       145        97
VIS    2025250     91400   18.2400 -109.2900      11.8        57       155       100
VIS    2025250     91400   18.2600 -109.3100      12.1        54       152       100
VIS    2025250     91400   18.2400 -109.3500      10.9        51       176       100
VIS    2025250     91400   18.2600 -109.3800      10.2        55       171        99
VIS    2025250     91400   18.2600 -109.4000       9.5        51       171        99
VIS    2025250     91400   18.2500 -109.4400       9.2        49       173        96
VIS    2025250     91400   18.2600 -109.4600       8.7        50       173        96
VIS    2025250     91400   18.2500 -109.5000       8.3        48       181        98
VIS    2025250     91400   18.2500 -109.5200       7.9        43       185       100
VIS    2025250     91400   18.2100 -110.3600       9.1        71       163        96
VIS    2025250     91400   18.2100 -110.4500       8.9        54       158        93
VIS    2025250     91400   18.2000 -110.4800       8.9        63       155        96
VIS    2025250     91400   18.2000 -110.5100       9.1        64       146       100
VIS    2025250     91400   18.2100 -110.5300       8.8        56       146       100
VIS    2025250     91400   18.2000 -110.5600       8.7        53       145        93
VIS    2025250     91400   18.2100 -110.5800       7.6        48       152        90
VIS    2025250     91400   18.2000 -110.7000      17.3        91       152        92
VIS    2025250     91400   18.2000 -110.9300      11.3        82       137       100
VIS    2025250     91400   18.2000 -110.9400      11.5        82       137       100
VIS    2025250     91400   18.2000 -110.9700      12.3        84       138       100
VIS    2025250     91400   18.2100 -111.0200      10.1        82       141        97
VIS    2025250     91400   18.1900 -111.0400      11.0        89       141       100
VIS    2025250     91400   18.1800 -111.0800      12.1        95       143       100
VIS    2025250     91400   18.1900 -111.1000      10.3        89       147       100
VIS    2025250     91400   18.2000 -111.1200       9.6        86       147       100
VIS    2025250     91400   18.2000 -111.1700       7.6        82       146        95
VIS    2025250     91400   18.1900 -111.2200       7.7        85       141        99
VIS    2025250     91400   18.2000 -111.2300       8.1        79       133       100
VIS    2025250     91400   18.2000 -111.2700      10.4        83       125        98
VIS    2025250     91400   18.1900 -111.3200      10.2        80       117        95
VIS    2025250     91400   18.1900 -111.3500      10.2        77       116        91
VIS    2025250     91400   18.1900 -111.3800      10.7        83       122        94
VIS    2025250     91400   18.1700 -111.4400       6.9        63       123        97
VIS    2025250     91400   18.1800 -111.4600       6.6        67       123        98
VIS    2025250     91400   18.1900 -111.4800       5.6        78       117        93
VIS    2025250     91400   18.1900 -111.5400       6.8        75       117        95
VIS    2025250     91400   18.1900 -111.5800       5.9        75       109        97
VIS    2025250     91400   18.1800 -111.7000       5.0        87       104        93
VIS    2025250     91400   18.1800 -111.7200       4.3       103       112       100
VIS    2025250     91400   18.1800 -111.7400       4.2       117       114       100
VIS    2025250     91400   18.1700 -112.0000       5.2        77       133       100
VIS    2025250     91400   18.1800 -112.0500       4.8        82       126        94
VIS    2025250     91400   18.1600 -112.2800       6.8       104       119        92
VIS    2025250     91400   18.1500 -112.3100       7.6       103       123        95
VIS    2025250     91400   18.1500 -112.3300       7.4       108       126        96
VIS    2025250     91400   18.1500 -112.3600       6.9       106       129        97
VIS    2025250     91400   18.1400 -112.3900       5.5        96       135        92
VIS    2025250     91400   18.1400 -112.6400       6.9       137       127        99
VIS    2025250     91400   18.1500 -112.6700       5.5       134       127        93
VIS    2025250     91400   18.1400 -112.6800       6.1       146       127        96
VIS    2025250     91400   18.1400 -112.7200       5.5       146       134        96
VIS    2025250     91400   18.1400 -112.7600       5.6       154       137        99
VIS    2025250     91400   18.1300 -112.7900       5.5       161       142        92
VIS    2025250     91400   18.1500 -112.8100       5.2       133       147        99
VIS    2025250     91400   18.1500 -112.8200       4.9       122       146       100
VIS    2025250     91400   18.1300 -112.8500       4.0       144       145        93
VIS    2025250     91400   18.1500 -112.9000       5.0       131       140        93
VIS    2025250     91400   18.1300 -112.9300       5.6       127       142       100
VIS    2025250     91400   18.1400 -112.9500       4.8       117       143       100
VIS    2025250     91400   18.1400 -112.9600       4.7       115       142        99
VIS    2025250     91400   18.1300 -113.0800       5.7       101       163       100
VIS    2025250     91400   18.1400 -113.1400       4.2       110       156        97
VIS    2025250     91400   18.1400 -113.3400       6.0       132       128        91
VIS    2025250     91400   18.1200 -113.3800       5.5       124       131        95
VIS    2025250     91400   18.1300 -113.4200       6.2       128       143        99
VIS    2025250     91400   18.1200 -113.4300       6.3       129       154       100
VIS    2025250     91400   18.1200 -113.4600       6.8       130       158        99
VIS    2025250     91400   18.1300 -113.5100       6.1       110       164        91
VIS    2025250     91400   18.1100 -113.5300       5.9       107       162        98
VIS    2025250     91400   18.1200 -113.5500       6.8       109       169       100
VIS    2025250     91400   18.1100 -113.6900       4.8       155       173        94
VIS    2025250     91400   18.1300 -113.7200       4.2       128       162       100
VIS    2025250     91400   18.0900 -114.3900       4.2       299       141       100
VIS    2025250     91400   18.0900 -114.4000       4.3       299       141       100
VIS    2025250     91400   18.1000 -114.4200       4.0       295       142        99
VIS    2025250     91400   18.1000 -114.5300       4.9       268       163        98
VIS    2025250     91400   18.0800 -114.5400       5.3       260       168        99
VIS    2025250     91400   18.1000 -114.6500       4.1       271       167        95
VIS    2025250     91400   18.0800 -114.6500       4.0       277       168        99
VIS    2025250     91400   18.1000 -114.8000       4.2       276       166        92
VIS    2025250     91400   18.0900 -114.9400       4.6       269       177        96
VIS    2025250     91400   18.0700 -114.9700       4.4       243       178        94
VIS    2025250     91400   18.0900 -115.1200       4.0       251       187        92
VIS    2025250     91400   18.0600 -115.7900       5.6        45       173        96
VIS    2025250     91400   18.0500 -115.8000       5.6        52       173        91
VIS    2025250     91400   18.0700 -115.8300       4.9        55       175        98
VIS    2025250     91400   18.0400 -116.6800      11.5        73       160       100
VIS    2025250     91400   18.0400 -116.7700       4.7       339       162        90
VIS    2025250     91400   18.0300 -116.9100       6.6         2       174        98
VIS    2025250     91400   18.0400 -116.9800       7.4        14       169        99
VIS    2025250     91400   18.0200 -117.0100       5.8       358       174        99
VIS    2025250     91400   17.9600 -119.2400      16.5        17       152        95
VIS    2025250     91400   17.9600 -119.2600      15.5        19       152       100
VIS    2025250     91400   17.9800 -119.3000      16.1        20       138       100
VIS    2025250     91400   17.9700 -119.3400      13.7        24       143       100
VIS    2025250     91400   17.9600 -119.3400      13.5        25       139       100
VIS    2025250     91400   18.2600 -108.6500       7.6        72       147        99
VIS    2025250     91400   18.2600 -108.6600       7.6        73       147        99
VIS    2025250     91400   18.2500 -108.6900       8.2        87       144        99
VIS    2025250     91400   18.2400 -108.7500       7.9        92       139       100
VIS    2025250     91400   18.2400 -108.7700       8.1        89       135        99
VIS    2025250     91400   18.2500 -108.9800      12.7        72       129        99
VIS    2025250     91400   18.2300 -109.1800       7.9        62       135        94
VIS    2025250     91400   18.2400 -109.1900       8.5        65       134        92
VIS    2025250     91400   18.2400 -109.2700      11.6        59       152        96
VIS    2025250     91400   18.2200 -109.2900      12.4        58       164       100
VIS    2025250     91400   18.2300 -109.3200      12.4        55       173       100
VIS    2025250     91400   18.2300 -109.3500      11.0        47       180       100
VIS    2025250     91400   18.2300 -109.3900       8.6        42       178        99
VIS    2025250     91400   18.2300 -109.4000       8.6        43       177        98
VIS    2025250     91400   18.2200 -109.4300       9.1        48       180        98
VIS    2025250     91400   18.2300 -109.4800       9.7        44       185        98
VIS    2025250     91400   18.2300 -109.5100       9.5        44       189        99
VIS    2025250     91400   18.1800 -110.2900       8.8        48       169        98
VIS    2025250     91400   18.1800 -110.3200       8.5        55       165        96
VIS    2025250     91400   18.1800 -110.3600       8.6        76       160        98
VIS    2025250     91400   18.1800 -110.4000       9.4        75       154        97
VIS    2025250     91400   18.2000 -110.4100       9.3        69       159        97
VIS    2025250     91400   18.1900 -110.4300       9.0        62       156        99
VIS    2025250     91400   18.1800 -110.4800       9.9        80       149        98
VIS    2025250     91400   18.1900 -110.5200       9.3        69       143       100
VIS    2025250     91400   18.1900 -110.5200       9.3        67       143       100
VIS    2025250     91400   18.1700 -110.6000      10.6        92       154        91
VIS    2025250     91400   18.1700 -110.6200      11.1        94       157        96
VIS    2025250     91400   18.1800 -110.6500      12.6        93       158       100
VIS    2025250     91400   18.1700 -110.6800      17.5        95       154        97
VIS    2025250     91400   18.1700 -110.8000      10.4        42       146        99
VIS    2025250     91400   18.1700 -110.9400      12.3        89       136        99
VIS    2025250     91400   18.1800 -110.9600      12.5        86       136        98
VIS    2025250     91400   18.1600 -110.9800      12.9        89       138        97
VIS    2025250     91400   18.1700 -111.0000      11.5        86       141        96
VIS    2025250     91400   18.1700 -111.0500      11.7        94       140       100
VIS    2025250     91400   18.1700 -111.0900      12.0        95       141       100
VIS    2025250     91400   18.1600 -111.1000      11.9        95       145        99
VIS    2025250     91400   18.1800 -111.1200      10.2        89       148        99
VIS    2025250     91400   18.1600 -111.1500       7.3        87       151       100
VIS    2025250     91400   18.1600 -111.2400       8.1        78       146        98
VIS    2025250     91400   18.1700 -111.2600       9.1        80       142       100
VIS    2025250     91400   18.1600 -111.2900       9.0        80       140       100
VIS    2025250     91400   18.1600 -111.3000       9.0        80       138        99
VIS    2025250     91400   18.1600 -111.3500       8.3        78       137        92
VIS    2025250     91400   18.1500 -111.3600       8.1        79       137        95
VIS    2025250     91400   18.1600 -111.4000       8.6        64       130        95
VIS    2025250     91400   18.1600 -111.4400       7.7        56       130       100
VIS    2025250     91400   18.1700 -111.4600       7.0        59       123        99
VIS    2025250     91400   18.1500 -111.4800       7.4        57       129       100
VIS    2025250     91400   18.1600 -111.5500       7.1        64       119        91
VIS    2025250     91400   18.1500 -111.7100       5.1        60       107        94
VIS    2025250     91400   18.1500 -112.0200       4.7        91       133        99
VIS    2025250     91400   18.1500 -112.0500       5.4        89       126        98
VIS    2025250     91400   18.1300 -112.0800       6.6        95       123        99
VIS    2025250     91400   18.1300 -112.3200       7.5       103       124        96
VIS    2025250     91400   18.1300 -112.3400       7.3       106       126        95
VIS    2025250     91400   18.1400 -112.3600       7.1       106       129        96
VIS    2025250     91400   18.1400 -112.4000       5.3        97       135        99
VIS    2025250     91400   18.1200 -112.4200       5.0       105       134       100
VIS    2025250     91400   18.1100 -112.6800       5.1       164       123        99
VIS    2025250     91400   18.1100 -112.7000       4.8       161       125        91
VIS    2025250     91400   18.1300 -112.7100       5.0       152       129        96
VIS    2025250     91400   18.1200 -112.7500       5.1       159       132       100
VIS    2025250     91400   18.1100 -112.7700       5.0       163       133        98
VIS    2025250     91400   18.1100 -112.8300       4.7       162       144        90
VIS    2025250     91400   18.1300 -112.8900       5.0       137       141        99
VIS    2025250     91400   18.1200 -112.9300       5.6       131       142        98
VIS    2025250     91400   18.1200 -112.9400       5.2       129       142       100
VIS    2025250     91400   18.1200 -113.0600       5.3       112       158        97
VIS    2025250     91400   18.1100 -113.3400       5.6       128       130        97
VIS    2025250     91400   18.1100 -113.3800       5.3       121       133        98
VIS    2025250     91400   18.0900 -113.4300       6.0       115       156        97
VIS    2025250     91400   18.0900 -113.4300       5.9       120       157       100
VIS    2025250     91400   18.1000 -113.4900       4.5        92       156        94
VIS    2025250     91400   18.0900 -113.5200       5.3       100       153        99
VIS    2025250     91400   18.0900 -113.5500       6.0       108       153        99
VIS    2025250     91400   18.1000 -113.6900       5.0       159       173        93
VIS    2025250     91400   18.0900 -113.7700       4.3       121       164        99
VIS    2025250     91400   18.0800 -113.7800       4.2       121       161       100
VIS    2025250     91400   18.0800 -113.8300       4.3       112       150       100
VIS    2025250     91400   18.0800 -114.4000       4.5       301       141       100
VIS    2025250     91400   18.0800 -114.4000       4.5       301       141       100
VIS    2025250     91400   18.0600 -114.4500       4.5       300       153        99
VIS    2025250     91400   18.0600 -114.4600       4.5       299       153        99
VIS    2025250     91400   18.0800 -114.5400       5.4       259       170        98
VIS    2025250     91400   18.0800 -114.5400       5.5       258       170        99
VIS    2025250     91400   18.0600 -114.5900       4.8       269       168        99
VIS    2025250     91400   18.0600 -114.6400       4.0       270       169        96
VIS    2025250     91400   18.0700 -114.7300       5.1       283       173        90
VIS    2025250     91400   18.0500 -114.7600       4.4       276       165        98
VIS    2025250     91400   18.0500 -114.7800       4.1       265       165        97
VIS    2025250     91400   18.0700 -114.9600       4.4       245       178        98
VIS    2025250     91400   18.0700 -114.9600       4.4       244       178        98
VIS    2025250     91400   18.0300 -115.7600       7.9        18       177        97
VIS    2025250     91400   18.0200 -115.8600       4.0       246       182       100
VIS    2025250     91400   18.0300 -115.9600       4.0       264       173        94
VIS    2025250     91400   18.0300 -115.9800       4.0       260       171        92
VIS    2025250     91400   18.0100 -116.4900       5.1        34       187        98
VIS    2025250     91400   18.0000 -116.9100       6.1       357       175        95
VIS    2025250     91400   18.0100 -116.9100       6.0         6       174        94
VIS    2025250     91400   17.9900 -117.0100       4.5       355       174       100
VIS    2025250     91400   18.0000 -117.0500       5.0       352       181        92
VIS    2025250     91400   17.9500 -119.2700      16.6        18       147       100
VIS    2025250     91400   17.9600 -119.3100      15.6        25       139       100
VIS    2025250     91400   17.9600 -119.3400      13.9        25       139       100
VIS    2025250     91400   17.9600 -119.3400      13.6        25       139       100
VIS    2025250     91400   17.9400 -119.3900      12.8        24       138        95
VIS    2025250     91400   18.2100 -108.7000       6.7        81       143       100
VIS    2025250     91400   18.2100 -108.7300       6.5        84       142        91
VIS    2025250     91400   18.2200 -108.7800       8.1        92       135       100
VIS    2025250     91400   18.1900 -109.1800       6.2        76       144        98
VIS    2025250     91400   18.1900 -109.2100       6.0        80       145        90
VIS    2025250     91400   18.2100 -109.3100      13.1        59       166       100
VIS    2025250     91400   18.2100 -109.3100      13.1        58       173       100
VIS    2025250     91400   18.2100 -109.3600      11.3        43       184       100
VIS    2025250     91400   18.1600 -110.2700       7.5        51       171        96
VIS    2025250     91400   18.1800 -110.2900       8.9        47       169        99
VIS    2025250     91400   18.1700 -110.3300       8.4        61       163        99
VIS    2025250     91400   18.1600 -110.3700       9.0        81       145        97
VIS    2025250     91400   18.1600 -110.3900       9.8        83       145        97
VIS    2025250     91400   18.1500 -110.4200      10.4        75       145        96
VIS    2025250     91400   18.1600 -110.4600      10.8        72       149        96
VIS    2025250     91400   18.1600 -110.5000      11.3        87       141        93
VIS    2025250     91400   18.1500 -110.5900       8.7        88       149        97
VIS    2025250     91400   18.1600 -110.6300      11.4        95       155        98
VIS    2025250     91400   18.1700 -110.6700      17.5        96       154        97
VIS    2025250     91400   18.1700 -110.6800      17.5        96       154        97
VIS    2025250     91400   18.1400 -110.9400      13.1        90       136       100
VIS    2025250     91400   18.1500 -110.9700      13.4        91       137        99
VIS    2025250     91400   18.1600 -110.9800      13.3        90       138        99
VIS    2025250     91400   18.1600 -111.0300      12.2        92       141       100
VIS    2025250     91400   18.1400 -111.0500      11.8        92       137       100
VIS    2025250     91400   18.1500 -111.0700      12.4        96       137       100
VIS    2025250     91400   18.1500 -111.1200      12.2        96       145       100
VIS    2025250     91400   18.1300 -111.1300      12.8        94       145       100
VIS    2025250     91400   18.1500 -111.2700       8.3        76       144        99
VIS    2025250     91400   18.1300 -111.2800       8.4        79       144        98
VIS    2025250     91400   18.1400 -111.3100       8.2        84       143        99
VIS    2025250     91400   18.1500 -111.3500       7.9        84       138        93
VIS    2025250     91400   18.1500 -111.3900       8.5        72       135        96
VIS    2025250     91400   18.1200 -111.4000       8.3        70       137       100
VIS    2025250     91400   18.1400 -111.4500       8.1        50       130       100
VIS    2025250     91400   18.1400 -111.4600       8.0        46       130       100
VIS    2025250     91400   18.1400 -111.4900       7.7        53       129       100
VIS    2025250     91400   18.1400 -111.5200       7.3        58       127        90
VIS    2025250     91400   18.1200 -111.6500       7.8        70       107        98
VIS    2025250     91400   18.1200 -111.7300       5.1        50       110        98
VIS    2025250     91400   18.1100 -112.0300       5.8       114       127        98
VIS    2025250     91400   18.1200 -112.0400       5.5       110       133       100
VIS    2025250     91400   18.1200 -112.0700       6.3        99       124       100
VIS    2025250     91400   18.1100 -112.1800       6.0       105       123        97
VIS    2025250     91400   18.1200 -112.1900       5.9       105       123        98
VIS    2025250     91400   18.1200 -112.2900       7.8        99       116        93
VIS    2025250     91400   18.1000 -112.3100       7.8       102       119        98
VIS    2025250     91400   18.1200 -112.3500       7.3       105       128        98
VIS    2025250     91400   18.1000 -112.3700       7.3       104       129       100
VIS    2025250     91400   18.1100 -112.4200       5.1       107       134       100
VIS    2025250     91400   18.1100 -112.4200       5.1       107       134       100
VIS    2025250     91400   18.1000 -112.4500       7.0       108       123       100
VIS    2025250     91400   18.1000 -112.5100       6.7       125       124        92
VIS    2025250     91400   18.0900 -112.7000       4.6       168       124        96
VIS    2025250     91400   18.0800 -112.7400       4.9       166       129        95
VIS    2025250     91400   18.0800 -112.7600       4.7       165       131        95
VIS    2025250     91400   18.1000 -112.7700       4.8       164       133        97
VIS    2025250     91400   18.1000 -112.8200       4.5       164       140        92
VIS    2025250     91400   18.0800 -112.8300       4.1       165       140        96
VIS    2025250     91400   18.1000 -112.8800       4.1       156       145        95
VIS    2025250     91400   18.0900 -112.9600       4.6       134       145       100
VIS    2025250     91400   18.0900 -112.9900       5.8       126       145        90
VIS    2025250     91400   18.0800 -113.0200       5.6       122       151        96
VIS    2025250     91400   18.1000 -113.0400       5.2       115       154        92
VIS    2025250     91400   18.0700 -113.2500       8.2        90       139        98
VIS    2025250     91400   18.0800 -113.4300       5.9       113       156        95
VIS    2025250     91400   18.0800 -113.4300       5.7       111       156        94
VIS    2025250     91400   18.0700 -113.4900       4.3        85       152        93
VIS    2025250     91400   18.0700 -113.5000       4.1        91       151       100
VIS    2025250     91400   18.0800 -113.5200       5.0        99       153       100
VIS    2025250     91400   18.0800 -113.5600       6.0       110       151        92
VIS    2025250     91400   18.0600 -113.7400       5.0       117       164        98
VIS    2025250     91400   18.0700 -113.7600       4.8       117       162        99
VIS    2025250     91400   18.0500 -113.8100       4.4       119       150       100
VIS    2025250     91400   18.0700 -113.8200       4.5       115       150       100
VIS    2025250     91400   18.0500 -113.8400       4.2       115       149        98
VIS    2025250     91400   18.0500 -114.3300       4.1       306       146       100
VIS    2025250     91400   18.0400 -114.3700       4.1       303       146       100
VIS    2025250     91400   18.0400 -114.3900       4.2       309       142        99
VIS    2025250     91400   18.0500 -114.4300       4.5       310       146        99
VIS    2025250     91400   18.0600 -114.4500       4.5       303       149        99
VIS    2025250     91400   18.0600 -114.4600       4.6       302       153        99
VIS    2025250     91400   18.0500 -114.5300       4.8       279       170        99
VIS    2025250     91400   18.0400 -114.5700       5.1       279       169        99
VIS    2025250     91400   18.0500 -114.5900       4.8       271       168        99
VIS    2025250     91400   18.0500 -114.6200       4.3       273       168        95
VIS    2025250     91400   18.0500 -114.7600       4.5       277       165        99
VIS    2025250     91400   18.0500 -114.7700       4.2       270       165        99
VIS    2025250     91400   18.0200 -115.7500       8.7        18       176        96
VIS    2025250     91400   18.0200 -115.8600       4.0       246       182       100
VIS    2025250     91400   18.0200 -115.8800       4.1       245       182       100
VIS    2025250     91400   18.0100 -115.9100       4.2       244       182        99
VIS    2025250     91400   17.9800 -116.4700       5.5        41       187        97
VIS    2025250     91400   17.9900 -116.4800       5.3        37       187        90
VIS    2025250     91400   17.9900 -116.6900       9.0        57       161        95
VIS    2025250     91400   17.9800 -116.7200       8.6        54       162        97
VIS    2025250     91400   17.9900 -116.7200       9.4        52       162        92
VIS    2025250     91400   17.9800 -116.7700       6.1        41       168       100
VIS    2025250     91400   17.9700 -116.7900       6.0        45       169        98
VIS    2025250     91400   17.9900 -116.8300       4.4        15       174        97
VIS    2025250     91400   17.9900 -116.8300       4.3        10       176       100
VIS    2025250     91400   17.9700 -116.9000       5.0         0       175        99
VIS    2025250     91400   17.9700 -116.9200       4.4         1       175        90
VIS    2025250     91400   17.9900 -117.0100       4.5       352       174       100
VIS    2025250     91400   17.9100 -119.3200      14.1        18       135       100
VIS    2025250     91400   17.9300 -119.3300      15.1        25       136        98
VIS    2025250     91400   17.9200 -119.3600      13.9        25       137       100
VIS    2025250     91400   18.1900 -108.7000       5.9        70       146        98
VIS    2025250     91400   18.2000 -108.7100       6.2        79       143        92
VIS    2025250     91400   18.2000 -108.9900       8.8        68       142        92
VIS    2025250     91400   18.1900 -109.0100       7.0        53       141        92
VIS    2025250     91400   18.1800 -109.1800       7.1        77       145       100
VIS    2025250     91400   18.1700 -109.2600       6.1        73       156        99
VIS    2025250     91400   18.1700 -109.2800       6.4        76       158        98
VIS    2025250     91400   18.1700 -109.3400      14.5        59       173        91
VIS    2025250     91400   18.1400 -110.2600       6.6        56       171        90
VIS    2025250     91400   18.1400 -110.3200       8.4        63       157        99
VIS    2025250     91400   18.1400 -110.3300       8.4        63       157        98
VIS    2025250     91400   18.1500 -110.3700       8.9        80       145        99
VIS    2025250     91400   18.1300 -110.4400      12.2        77       134        99
VIS    2025250     91400   18.1300 -110.4500      12.2        77       134        99
VIS    2025250     91400   18.1300 -110.4800      12.9        85       134        99
VIS    2025250     91400   18.1500 -110.5300      11.0        78       139        92
VIS    2025250     91400   18.1400 -110.5400      11.0        76       139        92
VIS    2025250     91400   18.1400 -110.5900       8.6        87       146        97
VIS    2025250     91400   18.1200 -110.6000       8.8        78       149        95
VIS    2025250     91400   18.1100 -110.9200      12.1        92       143        94
VIS    2025250     91400   18.1200 -110.9400      12.9        89       137       100
VIS    2025250     91400   18.1200 -110.9700      13.4        92       138        99
VIS    2025250     91400   18.1100 -111.0000      13.6        96       142        98
VIS    2025250     91400   18.1300 -111.0200      13.5        95       142        96
VIS    2025250     91400   18.1100 -111.0700      11.4        90       134        99
VIS    2025250     91400   18.1100 -111.0800      11.6        91       134       100
VIS    2025250     91400   18.1300 -111.1300      13.0        94       141       100
VIS    2025250     91400   18.1300 -111.1300      13.0        93       145       100
VIS    2025250     91400   18.1100 -111.1700      10.4        79       148        99
VIS    2025250     91400   18.1100 -111.2100       9.0        79       151        99
VIS    2025250     91400   18.1200 -111.2500       9.7        74       153        96
VIS    2025250     91400   18.1200 -111.2500       9.5        76       150        96
VIS    2025250     91400   18.1200 -111.3000       8.3        83       144        99
VIS    2025250     91400   18.1200 -111.3300       7.6        84       141        96
VIS    2025250     91400   18.1100 -111.3500       7.7        83       141        98
VIS    2025250     91400   18.1000 -111.4000       8.2        73       139       100
VIS    2025250     91400   18.1000 -111.4000       8.1        71       138       100
VIS    2025250     91400   18.1200 -111.4400       8.2        54       135        97
VIS    2025250     91400   18.1000 -111.4700       6.8        43       130       100
VIS    2025250     91400   18.1000 -111.5000       6.7        49       128        90
VIS    2025250     91400   18.1100 -111.5200       7.0        55       127        90
VIS    2025250     91400   18.0900 -111.5700       8.1        76       117       100
VIS    2025250     91400   18.1000 -111.6000       8.7        84       117       100
VIS    2025250     91400   18.0900 -111.6300       8.6        87       116       100
VIS    2025250     91400   18.0900 -111.6500       8.2        81       110       100
VIS    2025250     91400   18.1000 -111.6900       6.5        66       108        93
VIS    2025250     91400   18.1000 -111.7100       6.0        66       110        97
VIS    2025250     91400   18.1000 -111.7400       4.8        57       112       100
VIS    2025250     91400   18.0800 -112.0100       7.7       124       126        95
VIS    2025250     91400   18.0900 -112.0400       6.2       113       121       100
VIS    2025250     91400   18.0900 -112.0700       5.7       110       119       100
VIS    2025250     91400   18.0900 -112.1100       8.6        96       115        90
VIS    2025250     91400   18.0700 -112.2300       8.6       115       110        96
VIS    2025250     91400   18.0800 -112.3000       7.8       104       112        95
VIS    2025250     91400   18.0700 -112.3200       7.8       106       116        98
VIS    2025250     91400   18.0800 -112.3700       7.8       106       123        99
VIS    2025250     91400   18.0800 -112.3700       7.9       105       123        99
VIS    2025250     91400   18.0700 -112.4200       7.6       106       123        91
VIS    2025250     91400   18.0700 -112.4400       7.7       104       117        98
VIS    2025250     91400   18.0700 -112.4700       8.6       110       116        97
VIS    2025250     91400   18.0700 -112.5000       7.3       116       116        99
VIS    2025250     91400   18.0700 -112.5200       6.7       120       116       100
VIS    2025250     91400   18.0700 -112.5500       6.2       121       115        98
VIS    2025250     91400   18.0700 -112.6800       5.2       161       120        98
VIS    2025250     91400   18.0800 -112.7000       4.6       168       124        94
VIS    2025250     91400   18.0800 -112.7400       4.8       167       130        93
VIS    2025250     91400   18.0700 -112.7500       4.7       166       131        94
VIS    2025250     91400   18.0800 -112.8500       4.0       167       143        97
VIS    2025250     91400   18.0700 -112.9700       4.7       132       146        98
VIS    2025250     91400   18.0700 -113.0000       6.3       128       146        98
VIS    2025250     91400   18.0700 -113.0200       5.7       123       150        96
VIS    2025250     91400   18.0600 -113.2900       8.6        89       138        97
VIS    2025250     91400   18.0400 -113.3500       7.1        91       147        93
VIS    2025250     91400   18.0600 -113.3700       7.0        91       145        97
VIS    2025250     91400   18.0600 -113.3800       7.6        96       147        93
VIS    2025250     91400   18.0600 -113.4100       7.6       101       157        93
VIS    2025250     91400   18.0400 -113.4700       5.9        82       146        93
VIS    2025250     91400   18.0400 -113.4700       5.8        82       146        94
VIS    2025250     91400   18.0500 -113.5000       4.9        84       145        90
VIS    2025250     91400   18.0400 -113.7500       4.7       124       156        99
VIS    2025250     91400   18.0300 -113.7600       4.6       122       154       100
VIS    2025250     91400   18.0400 -113.8000       4.4       122       150        99
VIS    2025250     91400   18.0300 -114.3000       4.2       304       154       100
VIS    2025250     91400   18.0100 -114.3300       4.4       307       154       100
VIS    2025250     91400   18.0300 -114.3700       4.1       303       146       100
VIS    2025250     91400   18.0300 -114.3900       4.2       309       146       100
VIS    2025250     91400   18.0300 -114.4300       4.7       320       150       100
VIS    2025250     91400   18.0100 -114.4400       4.7       325       157       100
VIS    2025250     91400   18.0200 -114.4700       4.8       321       160       100
VIS    2025250     91400   18.0100 -114.5500       5.4       303       172       100
VIS    2025250     91400   18.0200 -114.5700       5.3       291       169        99
VIS    2025250     91400   18.0300 -114.5800       5.2       288       168        99
VIS    2025250     91400   18.0200 -114.6300       4.1       289       170       100
VIS    2025250     91400   18.0100 -114.8100       4.2       282       167        92
VIS    2025250     91400   18.0000 -115.7500       8.5        25       174        99
VIS    2025250     91400   17.9700 -116.2000       4.1        37       178        96
VIS    2025250     91400   17.9800 -116.2000       4.1        35       178       100
VIS    2025250     91400   17.9600 -116.2500       4.4        26       178        99
VIS    2025250     91400   17.9600 -116.2600       4.2        24       179       100
VIS    2025250     91400   17.9800 -116.4900       4.4        39       184        99
VIS    2025250     91400   17.9600 -116.6600       8.4        72       162        94
VIS    2025250     91400   17.9500 -116.7100       6.6        65       164        97
VIS    2025250     91400   17.9700 -116.7300       8.4        54       163        92
VIS    2025250     91400   17.9500 -116.7800       6.4        28       170        98
VIS    2025250     91400   17.9500 -116.7800       6.4        26       173        99
VIS    2025250     91400   17.9600 -116.8300       5.0        29       173        98
VIS    2025250     91400   17.9500 -116.8900       5.0         6       176        98
VIS    2025250     91400   17.9600 -116.9100       5.1        11       175       100
VIS    2025250     91400   17.9700 -116.9600       4.2         9       177        95
VIS    2025250     91400   17.8900 -119.2800      15.4        14       141        99
VIS    2025250     91400   17.8900 -119.3200      13.9        16       136       100
VIS    2025250     91400   17.8900 -119.3500      13.7        20       138        96
VIS    2025250     91400   17.9000 -119.3700      13.6        24       139        96
VIS    2025250     91400   18.1800 -108.7000       5.9        66       147       100
VIS    2025250     91400   18.1500 -108.9600       7.0        58       152        91
VIS    2025250     91400   18.1500 -109.0800       7.1        61       143       100
VIS    2025250     91400   18.1400 -109.1800       9.6        73       146        90
VIS    2025250     91400   18.1600 -109.2000       5.9        73       150        92
VIS    2025250     91400   18.1500 -109.2500       7.3        80       155        96
VIS    2025250     91400   18.1500 -109.2900       7.4        79       160        98
VIS    2025250     91400   18.1100 -110.1900       8.0        29       187        98
VIS    2025250     91400   18.1200 -110.2300       7.0        48       180        98
VIS    2025250     91400   18.1100 -110.2500       7.1        52       172        98
VIS    2025250     91400   18.1300 -110.3200       8.6        63       157        99
VIS    2025250     91400   18.1100 -110.4300      11.5        71       136        90
VIS    2025250     91400   18.1100 -110.4700      12.8        85       132        98
VIS    2025250     91400   18.1000 -110.4900      13.9        93       128        97
VIS    2025250     91400   18.1000 -110.5200      13.6        98       128        99
VIS    2025250     91400   18.1200 -110.5600      10.1        71       140        99
VIS    2025250     91400   18.1200 -110.5900       8.9        74       149        94
VIS    2025250     91400   18.1200 -110.6100       8.9        74       149        94
VIS    2025250     91400   18.1100 -110.7100       9.0        56       156        97
VIS    2025250     91400   18.1000 -110.7500       8.7        58       154        92
VIS    2025250     91400   18.1000 -110.7500       9.0        57       154        98
VIS    2025250     91400   18.1000 -110.8900      11.9        92       147        92
VIS    2025250     91400   18.1000 -110.9200      12.0        92       144        93
VIS    2025250     91400   18.1100 -110.9300      12.2        92       143        95
VIS    2025250     91400   18.0900 -110.9700      13.3        99       144       100
VIS    2025250     91400   18.1000 -111.0000      13.3        97       142        99
VIS    2025250     91400   18.0900 -111.0500      11.9        92       137        98
VIS    2025250     91400   18.1000 -111.0700      11.5        91       134        99
VIS    2025250     91400   18.1000 -111.0800      11.6        91       134       100
VIS    2025250     91400   18.0900 -111.1100      13.0        93       138       100
VIS    2025250     91400   18.1000 -111.1600      10.8        81       148       100
VIS    2025250     91400   18.1000 -111.1900       9.3        77       150       100
VIS    2025250     91400   18.1000 -111.2000       9.0        78       150       100
VIS    2025250     91400   18.0900 -111.2500       9.8        73       153        98
VIS    2025250     91400   18.0900 -111.2700       9.3        78       147        95
VIS    2025250     91400   18.0800 -111.3000       8.7        78       146        96
VIS    2025250     91400   18.0800 -111.3200       8.2        79       145        92
VIS    2025250     91400   18.1000 -111.3400       8.0        79       141        99
VIS    2025250     91400   18.0700 -111.4000       8.6        65       137        99
VIS    2025250     91400   18.0800 -111.4100       8.4        66       138        99
VIS    2025250     91400   18.0800 -111.4500       7.7        56       132        98
VIS    2025250     91400   18.0900 -111.4600       6.9        48       130        99
VIS    2025250     91400   18.0900 -111.5200       6.4        57       126        96
VIS    2025250     91400   18.0800 -111.5400       7.3        72       121       100
VIS    2025250     91400   18.0700 -111.5800       8.4        83       117        98
VIS    2025250     91400   18.0800 -111.5900       8.6        83       117       100
VIS    2025250     91400   18.0900 -111.6200       8.2        87       116        99
VIS    2025250     91400   18.0700 -111.6500       8.0        86       115       100
VIS    2025250     91400   18.0700 -111.6900       7.4        76       111        99
VIS    2025250     91400   18.0900 -111.7200       5.7        69       112        99
VIS    2025250     91400   18.0700 -111.7300       5.2        68       112       100
VIS    2025250     91400   18.0800 -112.0100       8.1       127       126        92
VIS    2025250     91400   18.0600 -112.0400       7.6       118       116        99
VIS    2025250     91400   18.0500 -112.0700       6.5       109       111        91
VIS    2025250     91400   18.0600 -112.1200       8.0       104       107        92
VIS    2025250     91400   18.0500 -112.1600       8.8       122       114        97
VIS    2025250     91400   18.0600 -112.1800       7.3       130       115        93
VIS    2025250     91400   18.0500 -112.3300       8.8       107       114       100
VIS    2025250     91400   18.0700 -112.3700       8.4       108       123        92
VIS    2025250     91400   18.0400 -112.4000       9.3       109       113        92
VIS    2025250     91400   18.0400 -112.4100       9.4       109       113        93
VIS    2025250     91400   18.0600 -112.4600       8.1       102       116       100
VIS    2025250     91400   18.0600 -112.5000       7.4       112       115        99
VIS    2025250     91400   18.0400 -112.5300       6.1       115       112        93
VIS    2025250     91400   18.0500 -112.5600       5.9       118       115        96
VIS    2025250     91400   18.0400 -112.5800       5.7       113       115        99
VIS    2025250     91400   18.0500 -112.6800       5.8       161       124        99
VIS    2025250     91400   18.0300 -112.8600       4.1       165       138        91
VIS    2025250     91400   18.0200 -113.1600       5.8       114       151       100
VIS    2025250     91400   18.0300 -113.1700       5.5       111       151        98
VIS    2025250     91400   18.0400 -113.3400       6.4        95       147        97
VIS    2025250     91400   18.0300 -113.3800       8.3        99       153       100
VIS    2025250     91400   18.0400 -113.4000       8.6        98       158        95
VIS    2025250     91400   18.0300 -113.4700       5.9        82       146        92
VIS    2025250     91400   18.0100 -113.7800       4.3       139       145       100
VIS    2025250     91400   18.0100 -114.3200       4.5       306       154       100
VIS    2025250     91400   18.0100 -114.3400       4.4       307       154       100
VIS    2025250     91400   18.0100 -114.3700       4.3       303       156       100
VIS    2025250     91400   18.0000 -114.4100       4.2       312       156       100
VIS    2025250     91400   18.0000 -114.4300       4.4       322       157       100
VIS    2025250     91400   18.0100 -114.4400       4.6       325       159       100
VIS    2025250     91400   18.0000 -114.5400       5.4       302       172       100
VIS    2025250     91400   17.9800 -114.5700       5.2       296       174       100
VIS    2025250     91400   17.9900 -114.6000       5.2       299       167       100
VIS    2025250     91400   17.9900 -114.6700       4.0       294       169        99
VIS    2025250     91400   17.9900 -114.6800       4.3       287       168       100
VIS    2025250     91400   17.9800 -114.7100       4.9       281       167       100
VIS    2025250     91400   17.9900 -114.7400       4.8       287       164        95
VIS    2025250     91400   17.9800 -114.8300       5.0       296       170        98
VIS    2025250     91400   17.9700 -114.8800       4.2       275       176        99
VIS    2025250     91400   17.9700 -115.0000       5.1         3       180       100
VIS    2025250     91400   17.9600 -115.7100       7.9       349       172       100
VIS    2025250     91400   17.9600 -115.7800       4.9       112       173        93
VIS    2025250     91400   17.9700 -115.7900       4.4        96       172        90
VIS    2025250     91400   17.9700 -115.9100       4.2       282       175        98
VIS    2025250     91400   17.9600 -115.9500       4.1       260       173        92
VIS    2025250     91400   17.9600 -116.2600       4.4        24       179        99
VIS    2025250     91400   17.9500 -116.2900       4.3        24       179        99
VIS    2025250     91400   17.9400 -116.2900       5.0        25       187       100
VIS    2025250     91400   17.9500 -116.5300       4.0        31       174       100
VIS    2025250     91400   17.9400 -116.5400       4.1        18       175        97
VIS    2025250     91400   17.9500 -116.7100       6.3        66       166        93
VIS    2025250     91400   17.9300 -116.7800       7.1        15       173        95
VIS    2025250     91400   17.9200 -116.8000       6.2        16       178        97
VIS    2025250     91400   17.9400 -116.9500       5.7        22       177       100
VIS    2025250     91400   17.8700 -119.2700      14.9        15       143        97
VIS    2025250     91400   17.8600 -119.2900      15.0        15       141       100
VIS    2025250     91400   17.8800 -119.3200      14.1        15       136        99
VIS    2025250     91400   17.8800 -119.3400      13.7        18       138        98
VIS    2025250     91400   17.8600 -119.3700      13.1        21       143        97
VIS    2025250     91400   18.1300 -108.8700       9.3        74       152       100
VIS    2025250     91400   18.1300 -108.8800       9.1        71       152       100
VIS    2025250     91400   18.1400 -109.0500       9.8        53       146        98
VIS    2025250     91400   18.1400 -109.0700       8.6        52       145        97
VIS    2025250     91400   18.1200 -109.1300       9.0        68       142       100
VIS    2025250     91400   18.1200 -109.1800       9.3        75       143        95
VIS    2025250     91400   18.1200 -109.1800       9.6        75       143        97
VIS    2025250     91400   18.1300 -109.2600       7.9        84       156        99
VIS    2025250     91400   18.1400 -109.2800       7.9        78       162        97
VIS    2025250     91400   18.1200 -109.3000       8.4        74       166        97
VIS    2025250     91400   18.1100 -109.3500       9.2        52       186       100
VIS    2025250     91400   18.1000 -110.1800       7.8        23       181        91
VIS    2025250     91400   18.1100 -110.1900       8.0        24       183        93
VIS    2025250     91400   18.0900 -110.2400       8.3        49       174        99
VIS    2025250     91400   18.1100 -110.2500       7.4        50       171        98
VIS    2025250     91400   18.1000 -110.3300       8.8        65       153       100
VIS    2025250     91400   18.1000 -110.3400      10.3        63       153        99
VIS    2025250     91400   18.1000 -110.4000      14.6        41       142        92
VIS    2025250     91400   18.1000 -110.4400      12.2        63       132        91
VIS    2025250     91400   18.0800 -110.4800      14.0        91       125        90
VIS    2025250     91400   18.0800 -110.5000      13.9        93       125        94
VIS    2025250     91400   18.0800 -110.5400      12.8        97       125       100
VIS    2025250     91400   18.0800 -110.5500      12.8        97       128       100
VIS    2025250     91400   18.0900 -110.5900      10.3        75       143        97
VIS    2025250     91400   18.0700 -110.6300      10.2        71       144       100
VIS    2025250     91400   18.0700 -110.6600       9.4        77       151        95
VIS    2025250     91400   18.0800 -110.6700       9.5        77       151        93
VIS    2025250     91400   18.0700 -110.7200       9.1        69       151        97
VIS    2025250     91400   18.0800 -110.7300       9.1        69       151        98
VIS    2025250     91400   18.0900 -110.8600      16.6        87       153        91
VIS    2025250     91400   18.0800 -110.9200      12.5        92       144        96
VIS    2025250     91400   18.0800 -110.9300      12.8        93       144        98
VIS    2025250     91400   18.0600 -110.9700      13.2        99       148       100
VIS    2025250     91400   18.0800 -111.0100      13.0        99       144       100
VIS    2025250     91400   18.0600 -111.0500      12.3        92       137        98
VIS    2025250     91400   18.0700 -111.0600      12.4        89       134        99
VIS    2025250     91400   18.0800 -111.1000      13.2        93       138       100
VIS    2025250     91400   18.0700 -111.1300      12.4        93       139        99
VIS    2025250     91400   18.0700 -111.1500      10.5        92       148        99
VIS    2025250     91400   18.0600 -111.2600       9.6        81       157        98
VIS    2025250     91400   18.0700 -111.2600       9.3        78       155        98
VIS    2025250     91400   18.0700 -111.3000       8.6        78       147        96
VIS    2025250     91400   18.0500 -111.3800       8.2        72       130        98
VIS    2025250     91400   18.0500 -111.3800       8.3        71       130        99
VIS    2025250     91400   18.0500 -111.4200       8.8        67       132       100
VIS    2025250     91400   18.0600 -111.4600       7.6        54       130       100
VIS    2025250     91400   18.0600 -111.4700       7.4        53       128       100
VIS    2025250     91400   18.0500 -111.5200       7.7        79       122        98
VIS    2025250     91400   18.0500 -111.5600       9.0        79       117        98
VIS    2025250     91400   18.0600 -111.5800       8.0        73       117        91
VIS    2025250     91400   18.0500 -111.6600       7.3        87       116       100
VIS    2025250     91400   18.0500 -111.6900       6.8        79       116        99
VIS    2025250     91400   18.0400 -111.7300       6.1        68       116       100
VIS    2025250     91400   18.0400 -111.7600       5.7        70       116        98
VIS    2025250     91400   18.0400 -111.7700       5.6        70       116        98
VIS    2025250     91400   18.0500 -111.8700       5.0       103       134        96
VIS    2025250     91400   18.0300 -111.9000       4.4       103       134        99
VIS    2025250     91400   18.0300 -111.9700       6.2        95       122        97
VIS    2025250     91400   18.0400 -112.0100       9.0        93       122        94
VIS    2025250     91400   18.0500 -112.0700       6.5       112       103        90
VIS    2025250     91400   18.0500 -112.1600       8.6       120       114        94
VIS    2025250     91400   18.0400 -112.2000       8.6       128       114       100
VIS    2025250     91400   18.0300 -112.2100       9.4       127       115        99
VIS    2025250     91400   18.0300 -112.3400       8.7       100       114        99
VIS    2025250     91400   18.0300 -112.3500       8.8       100       114        99
VIS    2025250     91400   18.0300 -112.5300       5.3       111       112        97
VIS    2025250     91400   18.0200 -112.5600       4.8       104       112        98
VIS    2025250     91400   18.0100 -112.8600       4.1       159       136        92
VIS    2025250     91400   18.0000 -112.9800       4.6       185       148        98
VIS    2025250     91400   18.0000 -113.1300       4.4       119       145        97
VIS    2025250     91400   18.0000 -113.1400       4.7       116       146        99
VIS    2025250     91400   18.0100 -113.1800       5.6       116       151        98
VIS    2025250     91400   18.0000 -113.2000       5.2       117       149        99
VIS    2025250     91400   18.0100 -113.2300       4.2        84       150        90
VIS    2025250     91400   17.9900 -113.3000       8.3       101       149        94
VIS    2025250     91400   18.0000 -113.3100       7.6       101       149        90
VIS    2025250     91400   18.0000 -113.3400       7.7       103       150        96
VIS    2025250     91400   18.0000 -113.3700       8.2       101       153        97
VIS    2025250     91400   17.9900 -113.4000       8.4        99       157        99
VIS    2025250     91400   18.0000 -113.4500       4.9       110       153        93
VIS    2025250     91400   18.0100 -113.4700       5.1       109       146        91
VIS    2025250     91400   17.9700 -114.3300       4.1       308       158        98
VIS    2025250     91400   17.9600 -114.3600       4.2       310       162        96
VIS    2025250     91400   17.9800 -114.4400       4.4       308       161       100
VIS    2025250     91400   17.9600 -114.5400       4.7       301       170       100
VIS    2025250     91400   17.9600 -114.5600       5.6       305       174       100
VIS    2025250     91400   17.9700 -114.6000       5.5       295       173       100
VIS    2025250     91400   17.9700 -114.7000       4.9       284       167       100
VIS    2025250     91400   17.9700 -114.7000       4.9       283       167       100
VIS    2025250     91400   17.9500 -114.7400       4.9       281       163        99
VIS    2025250     91400   17.9600 -114.7600       4.1       275       164        99
VIS    2025250     91400   17.9700 -114.8300       4.8       298       170       100
VIS    2025250     91400   17.9600 -114.8800       4.2       276       176       100
VIS    2025250     91400   17.9600 -115.0000       5.7         2       180        99
VIS    2025250     91400   17.9500 -115.0200       4.4         1       182        98
VIS    2025250     91400   17.9200 -116.0000       6.9        18       185        99
VIS    2025250     91400   17.9000 -116.6800      11.0        38       171        99
VIS    2025250     91400   17.9000 -116.6800      11.0        38       171        99
VIS    2025250     91400   17.9000 -116.8200       6.3         4       183        98
VIS    2025250     91400   17.9000 -116.8700       5.2       355       180        93
VIS    2025250     91400   17.9000 -116.8900       4.3       355       177        98
VIS    2025250     91400   17.8500 -119.2900      14.3        16       142        99
VIS    2025250     91400   17.8400 -119.3200      13.6        19       139        99
VIS    2025250     91400   17.8600 -119.3400      13.8        18       139        95
VIS    2025250     91400   17.8400 -119.3600      12.9        18       143        96
VIS    2025250     91400   17.8600 -119.3900      12.9        22       147        99
VIS    2025250     91400   18.1200 -108.7200       7.1        89       150        90
VIS    2025250     91400   18.1100 -108.8300       5.9        92       150        99
VIS    2025250     91400   18.1100 -109.1200       9.4        68       143        99
VIS    2025250     91400   18.1200 -109.1200       9.8        67       143        99
VIS    2025250     91400   18.1100 -109.1800       9.5        76       145        96
VIS    2025250     91400   18.1100 -109.1900       9.8        79       146        97
VIS    2025250     91400   18.1100 -109.2700       7.7        83       162        95
VIS    2025250     91400   18.1100 -109.2800       7.9        79       164        95
VIS    2025250     91400   18.1000 -109.3100       8.6        71       168       100
VIS    2025250     91400   18.0800 -110.2400       8.6        51       171       100
VIS    2025250     91400   18.0800 -110.2600       9.2        48       166        94
VIS    2025250     91400   18.0600 -110.3400      13.3        75       142        94
VIS    2025250     91400   18.0600 -110.3400      13.1        77       140        97
VIS    2025250     91400   18.0600 -110.3900      13.2        86       134        94
VIS    2025250     91400   18.0700 -110.4700      14.7        80       128        94
VIS    2025250     91400   18.0700 -110.5000      13.5        93       125        98
VIS    2025250     91400   18.0700 -110.5400      12.5        96       125       100
VIS    2025250     91400   18.0600 -110.5600      12.2        92       128        99
VIS    2025250     91400   18.0600 -110.5900      11.7        85       134       100
VIS    2025250     91400   18.0600 -110.6200      10.6        75       144        99
VIS    2025250     91400   18.0500 -110.6700       9.0        71       144       100
VIS    2025250     91400   18.0500 -110.7000       9.1        76       151        97
VIS    2025250     91400   18.0700 -110.7200       9.1        70       151        96
VIS    2025250     91400   18.0700 -110.7300       9.1        71       151        95
VIS    2025250     91400   18.0400 -110.7600       8.3        71       152        92
VIS    2025250     91400   18.0500 -110.7900       9.8        97       152        93
VIS    2025250     91400   18.0400 -110.8700      10.6        94       152        94
VIS    2025250     91400   18.0400 -110.9100      10.7        95       149        98
VIS    2025250     91400   18.0500 -110.9300      12.9        94       144        95
VIS    2025250     91400   18.0400 -110.9600      13.5        97       149       100
VIS    2025250     91400   18.0500 -110.9700      13.4        98       149       100
VIS    2025250     91400   18.0500 -111.0000      12.8       100       152        99
VIS    2025250     91400   18.0400 -111.0500      11.8        86       137        91
VIS    2025250     91400   18.0400 -111.0800      13.6        83       133       100
VIS    2025250     91400   18.0400 -111.0900      13.6        82       136       100
VIS    2025250     91400   18.0300 -111.1300      10.8        86       138        96
VIS    2025250     91400   18.0400 -111.1700       7.1        74       154        94
VIS    2025250     91400   18.0300 -111.1800       7.3        71       154        96
VIS    2025250     91400   18.0300 -111.2700      10.5        93       158        91
VIS    2025250     91400   18.0400 -111.2700      10.0        88       158        96
VIS    2025250     91400   18.0500 -111.3000       8.6        81       148        97
VIS    2025250     91400   18.0400 -111.3300       8.4        80       147        99
VIS    2025250     91400   18.0400 -111.3700       8.3        77       129        98
VIS    2025250     91400   18.0200 -111.4100       8.6        75       131       100
VIS    2025250     91400   18.0200 -111.4200       8.6        75       131       100
VIS    2025250     91400   18.0300 -111.4500       9.3        68       132       100
VIS    2025250     91400   18.0200 -111.5000       8.6        79       126        99
VIS    2025250     91400   18.0300 -111.5400       9.1        85       119        97
VIS    2025250     91400   18.0300 -111.5700       9.2        72       115        93
VIS    2025250     91400   18.0300 -111.5900       8.8        68       114        98
VIS    2025250     91400   18.0200 -111.6400       7.9        79       116        93
VIS    2025250     91400   18.0300 -111.6700       6.4        84       120        98
VIS    2025250     91400   18.0400 -111.6900       6.3        80       116        99
VIS    2025250     91400   18.0200 -111.7300       6.0        72       120        97
VIS    2025250     91400   18.0300 -111.7600       5.9        69       116        99
VIS    2025250     91400   18.0100 -111.7800       6.8        73       115       100
VIS    2025250     91400   18.0200 -111.8100       7.7        64       114        94
VIS    2025250     91400   18.0200 -111.8700       4.9        91       129        97
VIS    2025250     91400   18.0200 -111.9100       4.6        98       131        99
VIS    2025250     91400   18.0100 -111.9700       7.2        98       119        90
VIS    2025250     91400   18.0100 -112.0000       8.2       100       117        95
VIS    2025250     91400   18.0100 -112.0200       9.0        92       115        99
VIS    2025250     91400   18.0000 -112.1700       9.2       114       110        93
VIS    2025250     91400   18.0200 -112.2000       8.9       120       115        96
VIS    2025250     91400   18.0200 -112.3400       8.7        99       114        99
VIS    2025250     91400   18.0100 -112.3800       8.8       102       114        98
VIS    2025250     91400   18.0200 -112.4000       9.1       107       109        97
VIS    2025250     91400   18.0000 -112.5300       4.4       101       113        96
VIS    2025250     91400   18.0000 -112.5400       4.7       102       112        99
VIS    2025250     91400   18.0100 -112.5600       4.7       101       112        99
VIS    2025250     91400   17.9900 -112.5900       4.7        95       115       100
VIS    2025250     91400   17.9900 -112.8400       4.9       154       132        96
VIS    2025250     91400   17.9700 -113.1200       4.4       116       130        91
VIS    2025250     91400   17.9900 -113.1600       5.8       118       147        99
VIS    2025250     91400   17.9700 -113.1700       5.8       115       145        99
VIS    2025250     91400   17.9700 -113.2100       5.3       117       147        97
VIS    2025250     91400   17.9900 -113.2300       4.9       112       150        99
VIS    2025250     91400   17.9900 -113.3100       8.5       100       149        94
VIS    2025250     91400   17.9900 -113.3300       7.8       101       150        93
VIS    2025250     91400   17.9900 -113.3400       7.6       102       150        96
VIS    2025250     91400   17.9800 -113.3900       8.1       101       155       100
VIS    2025250     91400   17.9900 -113.4000       8.3       100       157       100
VIS    2025250     91400   17.9600 -113.4400       4.6        97       153       100
VIS    2025250     91400   17.9600 -113.4800       4.3        89       146       100
VIS    2025250     91400   17.9600 -113.4900       4.1        74       145        96
VIS    2025250     91400   17.9600 -114.2800       4.2       313       161        99
VIS    2025250     91400   17.9600 -114.3600       4.1       310       162        95
VIS    2025250     91400   17.9500 -114.5200       4.7       300       167       100
VIS    2025250     91400   17.9300 -114.6100       4.6       294       164       100
VIS    2025250     91400   17.9500 -114.6200       4.4       293       164        99
VIS    2025250     91400   17.9300 -114.7000       4.3       282       163        99
VIS    2025250     91400   17.9400 -114.7100       4.7       282       163        99
VIS    2025250     91400   17.9300 -114.7600       4.5       289       164       100
VIS    2025250     91400   17.9300 -114.7800       4.2       286       165        95
VIS    2025250     91400   17.9200 -114.9000       4.4       281       178       100
VIS    2025250     91400   17.9200 -114.9100       4.2       275       179        99
VIS    2025250     91400   17.9400 -114.9500       4.5       282       179        98
VIS    2025250     91400   17.9200 -114.9700       4.4       283       177        95
VIS    2025250     91400   17.9200 -115.7700       4.1        92       175        91
VIS    2025250     91400   17.9100 -115.7700       4.2        78       185        96
VIS    2025250     91400   17.9000 -116.0300       7.5        20       184        99
VIS    2025250     91400   17.9100 -116.3000       4.2         4       184        93
VIS    2025250     91400   17.9000 -116.6800      11.1        37       171        98
VIS    2025250     91400   17.8900 -116.6800      11.4        35       171        98
VIS    2025250     91400   17.8900 -116.7100       8.4         7       176        90
VIS    2025250     91400   17.8200 -119.3000      13.9        22       143        99
VIS    2025250     91400   17.8300 -119.3200      13.6        19       139        99
VIS    2025250     91400   17.8200 -119.3600      12.1        16       143        93
VIS    2025250     91400   17.8200 -119.3700      12.5        18       143       100
VIS    2025250     91400   17.8300 -119.3900      12.2        18       145        99
VIS    2025250     91400   18.0900 -108.7300       7.1        89       154        99
VIS    2025250     91400   18.0900 -108.7600       6.8        89       150        98
VIS    2025250     91400   18.0900 -108.8000       6.1        84       150        96
VIS    2025250     91400   18.0700 -109.0700      10.1        71       153        97
VIS    2025250     91400   18.0800 -109.1500      11.9        72       145        98
VIS    2025250     91400   18.0900 -109.1900       9.5        80       146        94
VIS    2025250     91400   18.0900 -109.2200       8.0       100       156        92
VIS    2025250     91400   18.0700 -109.2600       6.8        84       164        91
VIS    2025250     91400   18.0600 -109.3100       9.0        68       176       100
VIS    2025250     91400   18.0700 -109.3400       8.7        62       184        99
VIS    2025250     91400   18.0800 -109.3600       8.0        55       190        99
VIS    2025250     91400   18.0600 -110.2100       7.1        53       175        92
VIS    2025250     91400   18.0400 -110.2400       8.9        54       171       100
VIS    2025250     91400   18.0400 -110.2700       9.7        53       163       100
VIS    2025250     91400   18.0500 -110.3700      13.0        83       134        96
VIS    2025250     91400   18.0500 -110.3900      13.7        90       133       100
VIS    2025250     91400   18.0400 -110.4300      15.4        86       131        98
VIS    2025250     91400   18.0500 -110.4700      15.3        82       127        96
VIS    2025250     91400   18.0300 -110.5400      12.9        92       124        90
VIS    2025250     91400   18.0400 -110.5800      12.7        91       128        98
VIS    2025250     91400   18.0400 -110.5900      12.5        90       128        99
VIS    2025250     91400   18.0400 -110.6200      11.7        85       136        94
VIS    2025250     91400   18.0400 -110.6600       9.2        69       144        99
VIS    2025250     91400   18.0400 -110.6900       8.9        71       149       100
VIS    2025250     91400   18.0300 -110.7900       9.6        95       152       100
VIS    2025250     91400   18.0200 -110.8100      10.7        96       152        99
VIS    2025250     91400   18.0300 -110.8300      11.2        94       154        99
VIS    2025250     91400   18.0300 -110.8600      11.1        93       153        99
VIS    2025250     91400   18.0100 -110.9000      11.7        97       149        95
VIS    2025250     91400   18.0200 -110.9400      13.0        95       149        97
VIS    2025250     91400   18.0300 -110.9700      13.3        97       152       100
VIS    2025250     91400   18.0300 -110.9800      13.1        97       152       100
VIS    2025250     91400   18.0200 -111.0200      11.6        96       150        97
VIS    2025250     91400   18.0300 -111.0500      11.7        86       142        92
VIS    2025250     91400   18.0100 -111.0800      12.9        82       134        99
VIS    2025250     91400   18.0100 -111.1200      12.3        81       134        97
VIS    2025250     91400   18.0100 -111.1300      11.3        81       137        93
VIS    2025250     91400   18.0100 -111.1800       7.4        77       155        99
VIS    2025250     91400   18.0100 -111.1900       7.6        78       155       100
VIS    2025250     91400   18.0200 -111.2600      10.8        95       158        94
VIS    2025250     91400   18.0100 -111.3000       9.5        94       154        99
VIS    2025250     91400   18.0200 -111.3100       8.9        90       154        98
VIS    2025250     91400   18.0000 -111.3600       8.9        76       140       100
VIS    2025250     91400   18.0100 -111.3600       8.8        77       139       100
VIS    2025250     91400   18.0100 -111.3900       8.4        78       130       100
VIS    2025250     91400   18.0200 -111.4200       8.6        75       132       100
VIS    2025250     91400   18.0000 -111.4600       9.0        75       132        99
VIS    2025250     91400   18.0100 -111.5000       8.9        82       122        97
VIS    2025250     91400   18.0000 -111.5200       9.3        83       120        93
VIS    2025250     91400   18.0000 -111.6100       8.6        67       114       100
VIS    2025250     91400   18.0100 -111.6300       8.4        71       116        97
VIS    2025250     91400   17.9900 -111.6800       5.3        77       125        92
VIS    2025250     91400   18.0100 -111.7000       5.3        76       121        97
VIS    2025250     91400   18.0100 -111.7300       6.2        69       121        98
VIS    2025250     91400   17.9900 -111.7700       6.2        72       121       100
VIS    2025250     91400   17.9900 -111.7800       6.1        73       121       100
VIS    2025250     91400   17.9900 -111.8100       5.7        86       120       100
VIS    2025250     91400   18.0100 -111.8300       4.5        93       125        95
VIS    2025250     91400   17.9900 -111.8900       5.4        98       125        99
VIS    2025250     91400   17.9900 -111.9000       5.5        98       125       100
VIS    2025250     91400   18.0000 -111.9200       5.3        95       125        97
VIS    2025250     91400   18.0000 -111.9900       8.0       100       116        94
VIS    2025250     91400   17.9700 -112.4200       6.0       130       103        91
VIS    2025250     91400   17.9900 -112.5400       4.2        94       114        95
VIS    2025250     91400   17.9900 -112.5600       4.1        87       115        95
VIS    2025250     91400   17.9700 -113.1300       4.9       114       128        92
VIS    2025250     91400   17.9700 -113.1500       5.6       111       136        97
VIS    2025250     91400   17.9600 -113.1700       5.7       109       140        98
VIS    2025250     91400   17.9700 -113.2000       5.6       114       147        98
VIS    2025250     91400   17.9500 -113.2300       5.6       114       147        96
VIS    2025250     91400   17.9600 -113.2700       4.9       102       152        97
VIS    2025250     91400   17.9400 -113.2900       5.5       106       149        96
VIS    2025250     91400   17.9400 -113.3400       6.7       109       151        98
VIS    2025250     91400   17.9400 -113.3700       6.4       104       154       100
VIS    2025250     91400   17.9500 -113.3900       6.6       103       155       100
VIS    2025250     91400   17.9600 -113.4300       5.5        97       156       100
VIS    2025250     91400   17.9600 -113.4400       4.6        94       153       100
VIS    2025250     91400   17.9600 -113.4800       4.3        86       146        98
VIS    2025250     91400   17.9500 -113.4900       4.2        74       145        97
VIS    2025250     91400   17.9500 -113.5200       4.6        56       138        95
VIS    2025250     91400   17.9500 -113.5700       4.0       356       131        98
VIS    2025250     91400   17.9200 -114.3600       4.2       310       161       100
VIS    2025250     91400   17.9200 -114.6600       4.6       283       163       100
VIS    2025250     91400   17.9200 -114.7000       4.5       279       165       100
VIS    2025250     91400   17.9000 -114.7300       4.3       287       165       100
VIS    2025250     91400   17.9100 -114.7500       4.5       295       164       100
VIS    2025250     91400   17.9100 -114.8900       4.6       283       178       100
VIS    2025250     91400   17.9200 -114.9100       4.3       278       179        99
VIS    2025250     91400   17.9000 -114.9500       4.5       279       179       100
VIS    2025250     91400   17.9100 -114.9800       4.2       273       177        99
VIS    2025250     91400   17.9000 -115.7800       4.4        72       179        95
VIS    2025250     91400   17.8600 -116.5000       5.2        40       188        97
VIS    2025250     91400   17.8600 -116.6700       6.3         4       177        93
VIS    2025250     91400   17.8600 -116.7400       6.5         6       181        93
VIS    2025250     91400   17.8600 -116.7400       6.9         5       181        97
VIS    2025250     91400   17.8500 -116.8200       4.1       354       187        93
VIS    2025250     91400   17.8500 -117.1400       4.0        17       188        97
VIS    2025250     91400   17.8300 -118.2900      11.5         9       177        99
VIS    2025250     91400   17.8300 -118.3000      11.7        10       177        97
VIS    2025250     91400   17.8100 -119.2800      14.7        18       145       100
VIS    2025250     91400   17.8100 -119.2900      14.3        19       143       100
VIS    2025250     91400   17.8100 -119.3500      12.9        22       142       100
VIS    2025250     91400   17.8100 -119.3700      12.7        20       142        99
VIS    2025250     91400   18.0800 -108.7400       7.4        90       157       100
VIS    2025250     91400   18.0600 -108.7800       7.7        86       155        98
VIS    2025250     91400   18.0600 -108.8000       7.1        83       152        98
VIS    2025250     91400   18.0600 -109.0900       8.9        69       153        96
VIS    2025250     91400   18.0500 -109.1300       8.1        68       153       100
VIS    2025250     91400   18.0600 -109.1600      12.9        76       151        99
VIS    2025250     91400   18.0400 -109.2000      12.7        70       163        98
VIS    2025250     91400   18.0500 -109.2000      13.1        73       162        97
VIS    2025250     91400   18.0400 -109.2400      11.5        81       166        91
VIS    2025250     91400   18.0500 -109.2700       8.5        79       167        98
VIS    2025250     91400   18.0400 -109.3000       8.8        75       176       100
VIS    2025250     91400   18.0600 -109.3200       9.2        66       179       100
VIS    2025250     91400   18.0300 -110.2200       7.6        57       174        93
VIS    2025250     91400   18.0200 -110.2300       8.3        55       174        97
VIS    2025250     91400   18.0200 -110.2700       9.8        51       164       100
VIS    2025250     91400   18.0100 -110.3000      10.0        48       155        97
VIS    2025250     91400   18.0300 -110.3500      13.2        81       138        99
VIS    2025250     91400   18.0100 -110.3900      13.6        83       134        99
VIS    2025250     91400   18.0200 -110.4100      14.7        91       132        96
VIS    2025250     91400   18.0000 -110.4700      15.1        80       132        97
VIS    2025250     91400   18.0100 -110.4800      15.3        81       128        96
VIS    2025250     91400   18.0100 -110.5100      14.8        84       126        91
VIS    2025250     91400   18.0100 -110.5500      14.0        91       126        93
VIS    2025250     91400   18.0200 -110.5700      13.2        94       126        95
VIS    2025250     91400   18.0000 -110.6100      12.2       101       129       100
VIS    2025250     91400   18.0100 -110.6500      11.0       100       134        99
VIS    2025250     91400   18.0200 -110.6600       9.0        66       144        91
VIS    2025250     91400   18.0100 -110.6800       9.1        67       144        95
VIS    2025250     91400   18.0000 -110.7200       8.8        65       152        99
VIS    2025250     91400   18.0100 -110.7600       9.0        68       150        90
VIS    2025250     91400   18.0100 -110.8100      11.4        96       152        95
VIS    2025250     91400   18.0000 -110.8400      12.7        94       152        98
VIS    2025250     91400   18.0000 -110.8800      12.2        95       149        98
VIS    2025250     91400   18.0000 -110.9000      12.1        96       148        98
VIS    2025250     91400   17.9900 -110.9400      12.8        94       148        97
VIS    2025250     91400   18.0000 -110.9800      12.8        93       152       100
VIS    2025250     91400   18.0100 -110.9800      12.8        94       152       100
VIS    2025250     91400   17.9900 -111.0300      12.2        85       149        99
VIS    2025250     91400   17.9900 -111.0700      12.6        89       136       100
VIS    2025250     91400   17.9900 -111.0700      12.7        89       134        99
VIS    2025250     91400   17.9800 -111.1100      12.4        86       134       100
VIS    2025250     91400   18.0000 -111.1800       7.4        84       155       100
VIS    2025250     91400   18.0000 -111.1900       7.7        84       155        99
VIS    2025250     91400   18.0000 -111.3000       9.4        91       154        98
VIS    2025250     91400   17.9900 -111.3100       9.2        93       154        98
VIS    2025250     91400   18.0000 -111.3600       8.9        75       140       100
VIS    2025250     91400   18.0000 -111.3700       8.8        76       140        99
VIS    2025250     91400   17.9900 -111.4100       8.5        77       136       100
VIS    2025250     91400   17.9800 -111.4400       8.9        74       133        99
VIS    2025250     91400   17.9900 -111.4600       8.7        75       132        99
VIS    2025250     91400   17.9800 -111.5000       8.9        77       127        99
VIS    2025250     91400   17.9700 -111.5400       9.9        76       120        92
VIS    2025250     91400   17.9700 -111.5800       9.0        78       116        91
VIS    2025250     91400   17.9700 -111.6200       8.2        71       119        98
VIS    2025250     91400   17.9700 -111.6400       8.1        69       121        97
VIS    2025250     91400   17.9800 -111.6900       5.8        72       125        92
VIS    2025250     91400   17.9900 -111.6900       5.0        80       125        90
VIS    2025250     91400   17.9800 -111.7400       6.5        65       125       100
VIS    2025250     91400   17.9800 -111.7700       6.2        70       121       100
VIS    2025250     91400   17.9800 -111.7800       6.1        71       121       100
VIS    2025250     91400   17.9800 -111.8100       5.6        89       120       100
VIS    2025250     91400   17.9800 -111.8500       5.1        93       124        96
VIS    2025250     91400   17.9600 -111.9000       5.9        89       125        99
VIS    2025250     91400   17.9600 -111.9500       6.9        86       122        95
VIS    2025250     91400   17.9600 -112.0200       6.3        82       111        91
VIS    2025250     91400   17.9600 -112.2500       4.8        89       109        91
VIS    2025250     91400   17.9500 -112.4400       5.7       126       103        92
VIS    2025250     91400   17.9400 -112.4900       6.4       123       104        95
VIS    2025250     91400   17.9600 -112.5800       4.4        93       116        92
VIS    2025250     91400   17.9400 -113.0900       5.6        88       134        92
VIS    2025250     91400   17.9300 -113.1100       6.5        89       132        98
VIS    2025250     91400   17.9400 -113.1200       6.2        98       125        93
VIS    2025250     91400   17.9400 -113.1600       5.2        98       125        98
VIS    2025250     91400   17.9200 -113.1900       5.2        93       127        99
VIS    2025250     91400   17.9200 -113.2200       5.4       106       127        98
VIS    2025250     91400   17.9200 -113.2500       4.8       124       137        92
VIS    2025250     91400   17.9200 -113.2700       4.7       125       138        91
VIS    2025250     91400   17.9200 -113.3100       6.0       115       141        96
VIS    2025250     91400   17.9300 -113.3200       6.3       114       146        99
VIS    2025250     91400   17.9400 -113.3700       6.2       104       154        99
VIS    2025250     91400   17.9300 -113.3800       5.6       101       154       100
VIS    2025250     91400   17.9300 -113.4100       5.1        93       155        99
VIS    2025250     91400   17.9200 -113.4500       4.3        88       154        95
VIS    2025250     91400   17.9300 -113.5200       4.3        64       145       100
VIS    2025250     91400   17.8900 -114.3000       4.1       312       157        98
VIS    2025250     91400   17.9100 -114.3400       4.3       316       160       100
VIS    2025250     91400   17.9000 -114.3500       4.4       316       160       100
VIS    2025250     91400   17.9100 -114.4100       4.2       304       159        98
VIS    2025250     91400   17.8900 -114.4500       5.2       327       163        95
VIS    2025250     91400   17.9000 -114.4800       4.9       320       164        99
VIS    2025250     91400   17.9000 -114.5400       4.6       315       164        97
VIS    2025250     91400   17.9000 -114.6700       4.5       284       165        96
VIS    2025250     91400   17.9000 -114.7000       4.8       282       169        98
VIS    2025250     91400   17.8900 -114.7400       4.4       291       169        99
VIS    2025250     91400   17.9000 -114.7500       4.5       290       164       100
VIS    2025250     91400   17.8900 -114.9200       4.4       285       178        99
VIS    2025250     91400   17.8900 -114.9500       4.5       279       179       100
VIS    2025250     91400   17.8600 -115.7500       4.5        93       174        91
VIS    2025250     91400   17.8600 -115.7900       4.5        62       177        97
VIS    2025250     91400   17.8600 -115.8100       5.2        44       177        97
VIS    2025250     91400   17.8500 -116.4700       4.3        79       180        92
VIS    2025250     91400   17.8400 -116.5200       4.4        48       187        98
VIS    2025250     91400   17.8300 -116.6000       4.8       353       187        99
VIS    2025250     91400   17.8400 -116.6600       4.1         4       176        93
VIS    2025250     91400   17.8300 -116.7000       5.2         0       179        95
VIS    2025250     91400   17.8000 -117.9800      24.2       352       187        98
VIS    2025250     91400   17.7700 -119.2400      15.3        25       159       100
VIS    2025250     91400   17.7800 -119.2600      15.2        23       158       100
VIS    2025250     91400   17.7600 -119.3400      14.5        26       144        98
VIS    2025250     91400   17.7800 -119.3600      14.3        27       143        91
VIS    2025250     91400   17.7700 -119.3900      12.9        27       146        96
VIS    2025250     91400   17.7600 -119.4100      12.0        27       150        93
VIS    2025250     91400   18.0500 -108.7700       8.1        88       159        99
VIS    2025250     91400   18.0500 -108.7900       8.2        85       157       100
VIS    2025250     91400   18.0500 -108.8000       7.3        83       153        99
VIS    2025250     91400   18.0300 -108.9200       8.6        83       159        91
VIS    2025250     91400   18.0300 -109.1300       8.3        70       156        99
VIS    2025250     91400   18.0200 -109.1500       8.4        72       157        99
VIS    2025250     91400   18.0300 -109.2500      10.0        82       167       100
VIS    2025250     91400   18.0300 -109.2900       9.0        75       174        96
VIS    2025250     91400   18.0300 -109.3000       8.5        74       176       100
VIS    2025250     91400   18.0100 -110.2400       8.4        58       174        98
VIS    2025250     91400   17.9900 -110.2800       9.4        44       166       100
VIS    2025250     91400   18.0000 -110.3100       9.9        50       155        97
VIS    2025250     91400   17.9900 -110.3300       9.8        46       151       100
VIS    2025250     91400   17.9900 -110.3600      13.5        76       140        93
VIS    2025250     91400   18.0000 -110.3900      13.3        80       135        99
VIS    2025250     91400   17.9800 -110.5300      14.4        82       126        96
VIS    2025250     91400   17.9800 -110.5500      13.4        79       129        90
VIS    2025250     91400   17.9900 -110.5700      13.2        94       126        95
VIS    2025250     91400   17.9700 -110.6100      10.9        96       124        92
VIS    2025250     91400   17.9700 -110.6500       9.4        98       128        98
VIS    2025250     91400   17.9800 -110.7200      10.9        96       141        92
VIS    2025250     91400   17.9700 -110.8100      10.0        88       139        95
VIS    2025250     91400   17.9800 -110.8600      12.7        89       145        95
VIS    2025250     91400   17.9700 -110.8800      12.6        86       145        95
VIS    2025250     91400   17.9700 -110.9000      12.4        90       145        93
VIS    2025250     91400   17.9700 -110.9500      12.7        92       152        99
VIS    2025250     91400   17.9800 -110.9700      12.5        84       153        99
VIS    2025250     91400   17.9600 -111.0000      12.0        73       153        92
VIS    2025250     91400   17.9700 -111.0400      12.5        80       146        99
VIS    2025250     91400   17.9600 -111.0700      12.7        87       134       100
VIS    2025250     91400   17.9700 -111.1000      12.7        88       134       100
VIS    2025250     91400   17.9800 -111.1000      12.6        87       134       100
VIS    2025250     91400   17.9600 -111.1400      12.3        77       146       100
VIS    2025250     91400   17.9800 -111.1700       7.7        87       151        98
VIS    2025250     91400   17.9500 -111.2800       9.3        68       163        99
VIS    2025250     91400   17.9600 -111.2900       9.5        71       163        99
VIS    2025250     91400   17.9600 -111.3300       9.1        82       154        95
VIS    2025250     91400   17.9700 -111.3800       9.3        73       140        94
VIS    2025250     91400   17.9600 -111.4100       9.3        75       138        92
VIS    2025250     91400   17.9500 -111.4500       9.8        73       133        99
VIS    2025250     91400   17.9600 -111.4900       8.9        74       133        98
VIS    2025250     91400   17.9500 -111.5000       8.7        73       133        97
VIS    2025250     91400   17.9700 -111.5400      10.0        74       122        96
VIS    2025250     91400   17.9500 -111.5500      10.4        67       122       100
VIS    2025250     91400   17.9500 -111.6000       9.3        69       114        97
VIS    2025250     91400   17.9400 -111.6200       9.0        72       119        98
VIS    2025250     91400   17.9600 -111.6400       8.1        75       121        90
VIS    2025250     91400   17.9600 -111.6700       7.5        73       125        90
VIS    2025250     91400   17.9600 -111.7000       6.0        72       128        97
VIS    2025250     91400   17.9500 -111.7500       6.1        69       126        99
VIS    2025250     91400   17.9600 -111.7600       6.3        66       126       100
VIS    2025250     91400   17.9400 -111.9100       6.1        82       126       100
VIS    2025250     91400   17.9400 -111.9500       6.4        72       124        99
VIS    2025250     91400   17.9300 -111.9800       7.0        64       123        98
VIS    2025250     91400   17.9400 -111.9900       6.8        70       119        98
VIS    2025250     91400   17.9400 -112.0300       7.4        80       116       100
VIS    2025250     91400   17.9300 -112.1600       4.4        86       121        90
VIS    2025250     91400   17.9300 -112.1800       4.2        81       121        97
VIS    2025250     91400   17.9300 -112.4000       5.7        41       105        93
VIS    2025250     91400   17.9300 -112.4700       5.7       111       103        96
VIS    2025250     91400   17.9200 -112.5000       5.3       120       104        99
VIS    2025250     91400   17.9300 -112.5400       5.7       131       111        93
VIS    2025250     91400   17.9300 -112.6000       4.3        95       116        98
VIS    2025250     91400   17.9100 -113.1100       6.5        83       132       100
VIS    2025250     91400   17.9000 -113.1300       5.9        83       135        92
VIS    2025250     91400   17.9000 -113.1800       5.3        93       125        99
VIS    2025250     91400   17.9200 -113.1900       5.2        93       126       100
VIS    2025250     91400   17.9000 -113.2100       5.1       102       125        99
VIS    2025250     91400   17.9100 -113.2500       4.8       117       128        97
VIS    2025250     91400   17.8900 -113.3400       4.8       108       142        90
VIS    2025250     91400   17.8800 -113.8300       4.1         5       136        99
VIS    2025250     91400   17.8800 -114.2900       4.0       311       158        99
VIS    2025250     91400   17.8800 -114.3000       4.2       312       157        99
VIS    2025250     91400   17.8800 -114.3400       4.3       322       161        98
VIS    2025250     91400   17.8700 -114.3600       4.4       319       161        99
VIS    2025250     91400   17.8700 -114.3800       4.7       316       159        99
VIS    2025250     91400   17.8800 -114.4300       5.0       321       158        99
VIS    2025250     91400   17.8600 -114.4600       5.3       335       163        98
VIS    2025250     91400   17.8700 -114.4900       4.9       335       164        99
VIS    2025250     91400   17.8800 -114.5000       4.8       331       164       100
VIS    2025250     91400   17.8600 -114.5300       4.8       337       158        99
VIS    2025250     91400   17.8700 -114.7300       4.5       294       169        95
VIS    2025250     91400   17.8600 -114.8300       5.0       303       175        98
VIS    2025250     91400   17.8500 -115.0100       4.5       348       186        93
VIS    2025250     91400   17.8200 -116.6000       5.5       355       183        99
VIS    2025250     91400   17.8200 -116.7000       5.0         2       177        92
VIS    2025250     91400   17.7800 -118.3700      12.2        31       180       100
VIS    2025250     91400   17.7500 -119.2400      15.2        26       158        99
VIS    2025250     91400   17.7500 -119.2500      15.2        24       156        99
VIS    2025250     91400   17.7400 -119.2700      14.9        23       155       100
VIS    2025250     91400   17.7400 -119.3100      14.7        25       149        98
VIS    2025250     91400   17.7500 -119.3400      15.3        27       145       100
VIS    2025250     91400   17.7500 -119.3500      15.1        27       144       100
VIS    2025250     91400   17.7400 -119.3900      12.1        28       150       100
VIS    2025250     91400   17.7600 -119.4000      12.0        27       150        95
VIS    2025250     91400   18.0200 -108.7900       8.3        86       159        99
VIS    2025250     91400   18.0000 -108.8300       7.6        78       159        96
VIS    2025250     91400   18.0200 -108.8800       4.9       106       156        98
VIS    2025250     91400   18.0200 -108.9200       8.5        82       159       100
VIS    2025250     91400   17.9700 -110.2600       8.3        67       171        95
VIS    2025250     91400   17.9600 -110.3300       8.4        26       151        98
VIS    2025250     91400   17.9600 -110.3400       8.7        33       151        99
VIS    2025250     91400   17.9600 -110.3700      11.6        63       144        92
VIS    2025250     91400   17.9500 -110.4200      12.2        62       137        96
VIS    2025250     91400   17.9600 -110.4900      16.4        76       129        99
VIS    2025250     91400   17.9500 -110.5200      13.8        69       129        97
VIS    2025250     91400   17.9700 -110.5600      13.0        75       128        97
VIS    2025250     91400   17.9500 -110.6000      12.3        75       124        99
VIS    2025250     91400   17.9500 -110.6100      12.2        75       124        99
VIS    2025250     91400   17.9500 -110.6600      10.7        95       125        93
VIS    2025250     91400   17.9500 -110.6800      10.9        95       127        99
VIS    2025250     91400   17.9500 -110.7000      10.1        94       131       100
VIS    2025250     91400   17.9600 -110.7300      10.2        89       140        95
VIS    2025250     91400   17.9600 -110.7700      10.6        89       143        94
VIS    2025250     91400   17.9400 -110.8800      12.9        79       145        96
VIS    2025250     91400   17.9500 -110.9000      13.2        80       146       100
VIS    2025250     91400   17.9500 -110.9600      12.4        51       153        98
VIS    2025250     91400   17.9400 -111.0000      12.2        52       155        95
VIS    2025250     91400   17.9500 -111.0400      12.2        77       146        99
VIS    2025250     91400   17.9500 -111.0700      12.7        85       137       100
VIS    2025250     91400   17.9500 -111.0900      12.6        85       134       100
VIS    2025250     91400   17.9300 -111.1200      12.3        78       146       100
VIS    2025250     91400   17.9500 -111.1400      12.3        77       146       100
VIS    2025250     91400   17.9300 -111.2000      12.0        87       158        99
VIS    2025250     91400   17.9500 -111.2400      10.6        86       166        99
VIS    2025250     91400   17.9500 -111.2800       9.1        68       163       100
VIS    2025250     91400   17.9300 -111.3000       9.3        64       163        99
VIS    2025250     91400   17.9400 -111.3200       9.5        66       159        97
VIS    2025250     91400   17.9500 -111.3600      10.7        76       148        94
VIS    2025250     91400   17.9400 -111.3900      12.1        83       146        91
VIS    2025250     91400   17.9400 -111.4100      10.0        76       136        91
VIS    2025250     91400   17.9400 -111.4500      10.3        73       133       100
VIS    2025250     91400   17.9400 -111.4900       8.8        71       134        97
VIS    2025250     91400   17.9400 -111.5000       8.7        72       133        98
VIS    2025250     91400   17.9200 -111.5500      11.1        63       116       100
VIS    2025250     91400   17.9400 -111.5500      10.5        66       116       100
VIS    2025250     91400   17.9200 -111.6100      10.1        69       119        98
VIS    2025250     91400   17.9300 -111.6200       9.5        72       121        94
VIS    2025250     91400   17.9200 -111.6500       8.8        78       124        90
VIS    2025250     91400   17.9400 -111.6700       8.1        77       128        95
VIS    2025250     91400   17.9200 -111.7900       7.9        74       126       100
VIS    2025250     91400   17.9300 -111.8100       7.3        78       126        90
VIS    2025250     91400   17.9200 -111.8300       7.2        79       126        92
VIS    2025250     91400   17.9200 -111.9400       5.9        60       126        97
VIS    2025250     91400   17.9300 -111.9700       6.8        61       123       100
VIS    2025250     91400   17.9100 -112.0200       8.0        64       123        98
VIS    2025250     91400   17.9200 -112.0500       8.0        66       122        94
VIS    2025250     91400   17.9200 -112.1600       4.5        84       121        90
VIS    2025250     91400   17.9200 -112.1800       4.3        79       124        95
VIS    2025250     91400   17.9000 -112.3000      11.1        93       103        91
VIS    2025250     91400   17.9000 -112.4500       8.3        81       103       100
VIS    2025250     91400   17.9000 -112.4800       5.1       110       103        91
VIS    2025250     91400   17.9000 -112.5000       4.7       103       103       100
VIS    2025250     91400   17.9000 -112.5800       4.3       126       114        90
VIS    2025250     91400   17.8900 -113.1400       6.1        84       135        96
VIS    2025250     91400   17.8900 -113.1800       5.3        92       125        99
VIS    2025250     91400   17.8900 -113.2100       4.9        91       123        99
VIS    2025250     91400   17.8800 -113.2300       4.9        86       120        99
VIS    2025250     91400   17.8500 -114.3000       4.4       325       161        96
VIS    2025250     91400   17.8500 -114.3000       4.3       325       161        95
VIS    2025250     91400   17.8500 -114.3500       4.3       323       161        99
VIS    2025250     91400   17.8600 -114.3600       4.5       322       161       100
VIS    2025250     91400   17.8400 -114.4000       4.9       328       155        98
VIS    2025250     91400   17.8400 -114.4400       5.0       334       160       100
VIS    2025250     91400   17.8500 -114.4600       5.6       337       163       100
VIS    2025250     91400   17.8400 -114.5000       4.5       341       163       100
VIS    2025250     91400   17.8400 -114.5100       4.2       340       158       100
VIS    2025250     91400   17.8600 -114.5300       4.7       338       158        99
VIS    2025250     91400   17.8300 -114.6900       4.1       296       170        97
VIS    2025250     91400   17.8500 -114.7000       4.4       297       171        90
VIS    2025250     91400   17.8300 -114.8100       5.1       305       175        96
VIS    2025250     91400   17.8100 -115.8100       7.5        23       187        99
VIS    2025250     91400   17.8100 -115.8500       8.3        18       183        98
VIS    2025250     91400   17.8000 -116.1200       8.1        50       180        94
VIS    2025250     91400   17.7900 -116.1500       7.9        50       179        96
VIS    2025250     91400   17.8000 -116.1500       8.2        48       179        97
VIS    2025250     91400   17.7500 -117.9200       7.8        20       188        99
VIS    2025250     91400   17.7400 -119.2500      15.1        25       156       100
VIS    2025250     91400   17.7300 -119.2900      14.6        23       152       100
VIS    2025250     91400   17.7400 -119.3000      14.8        24       149       100
VIS    2025250     91400   17.7400 -119.3200      14.7        25       148        97
VIS    2025250     91400   17.7200 -119.3700      13.6        25       147        98
VIS    2025250     91400   17.7300 -119.3900      12.6        28       150        99
VIS    2025250     91400   17.7200 -119.4000      12.4        26       150       100
VIS    2025250     91400   18.0000 -108.9200       8.3        80       160        96
VIS    2025250     91400   17.9500 -110.1500      10.6        47       180        94
VIS    2025250     91400   17.9400 -110.2400       9.9        67       167        93
VIS    2025250     91400   17.9500 -110.3300       8.1        24       148       100
VIS    2025250     91400   17.9400 -110.4200      12.4        63       140        98
VIS    2025250     91400   17.9300 -110.4300      11.8        70       141        95
VIS    2025250     91400   17.9400 -110.5200      12.8        65       129        94
VIS    2025250     91400   17.9400 -110.5600      12.9        71       126       100
VIS    2025250     91400   17.9400 -110.5900      12.6        73       124       100
VIS    2025250     91400   17.9400 -110.6100      12.3        74       124        99
VIS    2025250     91400   17.9300 -110.7000      10.2        86       127        97
VIS    2025250     91400   17.9300 -110.7200       9.5        88       132       100
VIS    2025250     91400   17.9300 -110.7400      10.1        85       141        99
VIS    2025250     91400   17.9200 -110.7600      10.7        83       143        96
VIS    2025250     91400   17.9300 -110.8600      11.8        72       140        97
VIS    2025250     91400   17.9400 -110.8800      12.9        79       145        95
VIS    2025250     91400   17.9200 -110.9300      14.9        82       147        98
VIS    2025250     91400   17.9100 -110.9800      14.4        53       153        96
VIS    2025250     91400   17.9100 -111.0500      10.8        68       154       100
VIS    2025250     91400   17.9200 -111.0800      12.0        76       146        99
VIS    2025250     91400   17.9200 -111.1000      12.3        76       146        99
VIS    2025250     91400   17.9200 -111.1200      12.2        77       147        98
VIS    2025250     91400   17.9300 -111.1500      11.8        78       152        94
VIS    2025250     91400   17.9100 -111.2000      10.7        86       157       100
VIS    2025250     91400   17.9100 -111.2200      10.7        89       158       100
VIS    2025250     91400   17.9000 -111.2400      10.6        89       163       100
VIS    2025250     91400   17.9000 -111.2900       7.9        75       165        99
VIS    2025250     91400   17.9200 -111.3100       8.9        63       164       100
VIS    2025250     91400   17.9000 -111.4100      13.4        38       151        93
VIS    2025250     91400   17.9000 -111.4200      13.4        38       148        95
VIS    2025250     91400   17.9100 -111.4700       8.9        80       140        99
VIS    2025250     91400   17.9100 -111.4800       8.6        75       139        99
VIS    2025250     91400   17.9000 -111.5200       8.7        65       131        97
VIS    2025250     91400   17.9000 -111.5500      11.1        61       123        99
VIS    2025250     91400   17.9000 -111.5800      11.4        64       123       100
VIS    2025250     91400   17.8900 -111.6000      11.2        65       123        98
VIS    2025250     91400   17.9100 -111.7200       8.0        59       131        91
VIS    2025250     91400   17.8900 -111.7500       8.6        62       129       100
VIS    2025250     91400   17.8900 -111.7800       8.4        61       127       100
VIS    2025250     91400   17.9000 -111.8100       7.8        71       127       100
VIS    2025250     91400   17.8900 -111.8400       8.0        73       127        99
VIS    2025250     91400   17.9000 -111.8700       7.3        73       126        91
VIS    2025250     91400   17.9000 -111.9100       6.1        71       128        93
VIS    2025250     91400   17.8900 -111.9400       6.1        62       129        99
VIS    2025250     91400   17.8900 -111.9700       7.0        65       128       100
VIS    2025250     91400   17.8800 -111.9800       7.5        68       128       100
VIS    2025250     91400   17.8900 -112.0100       7.9        63       125        97
VIS    2025250     91400   17.8900 -112.0300       8.1        61       126        94
VIS    2025250     91400   17.9000 -112.0700       7.6        67       127        90
VIS    2025250     91400   17.8800 -112.1200       8.3        69       124       100
VIS    2025250     91400   17.8900 -112.1300       7.9        71       122        97
VIS    2025250     91400   17.9000 -112.1500       6.3        73       124        94
VIS    2025250     91400   17.8900 -112.2000       5.2        56       126        92
VIS    2025250     91400   17.8900 -112.3500       7.9        62       105        95
VIS    2025250     91400   17.8900 -112.4600       8.1        81       103        99
VIS    2025250     91400   17.8700 -113.1500       5.2        83       135       100
VIS    2025250     91400   17.8700 -113.1800       5.3        87       126        97
VIS    2025250     91400   17.8500 -113.2700       4.2        65       122        91
VIS    2025250     91400   17.8400 -114.2500       4.0       341       161        99
VIS    2025250     91400   17.8300 -114.2900       5.2       332       161        96
VIS    2025250     91400   17.8400 -114.3100       4.6       328       161        93
VIS    2025250     91400   17.8400 -114.3600       4.3       325       160        99
VIS    2025250     91400   17.8100 -114.3900       4.5       334       157        99
VIS    2025250     91400   17.8300 -114.4000       4.8       330       155        98
VIS    2025250     91400   17.8200 -114.4300       4.7       337       157        97
VIS    2025250     91400   17.8300 -114.4500       4.8       337       163        99
VIS    2025250     91400   17.8300 -114.5000       4.3       342       160       100
VIS    2025250     91400   17.8100 -114.5200       4.3       343       156       100
VIS    2025250     91400   17.8200 -114.8400       4.7       305       177        99
VIS    2025250     91400   17.7800 -115.8500       9.3        21       183        95
VIS    2025250     91400   17.7700 -116.1300       8.1        60       180       100
VIS    2025250     91400   17.7700 -116.1700       7.2        63       184        96
VIS    2025250     91400   17.7700 -116.2000       5.3        64       189        95
VIS    2025250     91400   17.7700 -116.2200       5.0        69       189        94
VIS    2025250     91400   17.7500 -116.6900       5.5        20       182        97
VIS    2025250     91400   17.7200 -117.9800       5.1        36       190        94
VIS    2025250     91400   17.6900 -119.2500      16.2        22       162       100
VIS    2025250     91400   17.7000 -119.2800      16.0        26       153        92
VIS    2025250     91400   17.7100 -119.3300      15.0        27       148        97
VIS    2025250     91400   17.7000 -119.3800      13.7        24       147       100
VIS    2025250     91400   17.6900 -119.3900      13.2        23       150       100
VIS    2025250     91400   17.7000 -119.4200      12.5        21       152       100
VIS    2025250     91400   17.9200 -110.1800       9.5        73       178        91
VIS    2025250     91400   17.9200 -110.2000       9.9        73       174        97
VIS    2025250     91400   17.9300 -110.3300       8.2        24       156       100
VIS    2025250     91400   17.9100 -110.4100       9.9        49       147        99
VIS    2025250     91400   17.9000 -110.5000      16.7        65       141        97
VIS    2025250     91400   17.9200 -110.5500      13.1        73       128       100
VIS    2025250     91400   17.9000 -110.5800      13.0        73       128       100
VIS    2025250     91400   17.9000 -110.5900      12.9        73       128       100
VIS    2025250     91400   17.9200 -110.6300      13.1        75       129       100
VIS    2025250     91400   17.9000 -110.7100      10.0        77       135        93
VIS    2025250     91400   17.9000 -110.7600      10.0        84       142        97
VIS    2025250     91400   17.9000 -110.7700      10.7        82       143        94
VIS    2025250     91400   17.9100 -110.8200      10.6        79       144        90
VIS    2025250     91400   17.8900 -110.8300      10.4        76       145        94
VIS    2025250     91400   17.9000 -110.8600       9.9        76       145        99
VIS    2025250     91400   17.8900 -110.9300      13.6        79       151        90
VIS    2025250     91400   17.9000 -111.0600      10.4        62       155       100
VIS    2025250     91400   17.9000 -111.0900      11.4        72       149       100
VIS    2025250     91400   17.9000 -111.0900      11.6        73       148       100
VIS    2025250     91400   17.8900 -111.1300      12.4        79       153        96
VIS    2025250     91400   17.9000 -111.1700      11.5        83       156       100
VIS    2025250     91400   17.8900 -111.2100       9.9        88       157       100
VIS    2025250     91400   17.8800 -111.2400      10.4        89       158       100
VIS    2025250     91400   17.8800 -111.2600      10.4        88       163        98
VIS    2025250     91400   17.8800 -111.3900      13.3        45       157        92
VIS    2025250     91400   17.8900 -111.3900      13.6        45       157        96
VIS    2025250     91400   17.8900 -111.4200      13.3        37       148        90
VIS    2025250     91400   17.8800 -111.5000       9.2        51       133        90
VIS    2025250     91400   17.8900 -111.5500      11.3        61       123       100
VIS    2025250     91400   17.8800 -111.5700      11.8        63       123       100
VIS    2025250     91400   17.8900 -111.6000      11.2        65       123        98
VIS    2025250     91400   17.8800 -111.6900       8.9        62       131        97
VIS    2025250     91400   17.8600 -111.7400       9.3        60       131        99
VIS    2025250     91400   17.8800 -111.7500       8.7        61       129       100
VIS    2025250     91400   17.8800 -111.7700       8.5        58       128       100
VIS    2025250     91400   17.8800 -111.8400       8.1        72       127        99
VIS    2025250     91400   17.8700 -111.8800       8.0        66       128        95
VIS    2025250     91400   17.8700 -111.9100       7.7        67       129        96
VIS    2025250     91400   17.8800 -111.9400       7.0        63       129        97
VIS    2025250     91400   17.8600 -111.9700       8.2        57       130       100
VIS    2025250     91400   17.8700 -112.0000       8.2        66       128       100
VIS    2025250     91400   17.8700 -112.0300       8.0        64       128        97
VIS    2025250     91400   17.8600 -112.0500       8.3        63       129        98
VIS    2025250     91400   17.8500 -112.0800       8.5        67       128        99
VIS    2025250     91400   17.8700 -112.1100       8.4        68       125       100
VIS    2025250     91400   17.8600 -112.1500       8.4        69       122        99
VIS    2025250     91400   17.8600 -112.1500       8.1        67       122       100
VIS    2025250     91400   17.8700 -112.2100       7.0        52       122        96
VIS    2025250     91400   17.8700 -112.2100       7.1        50       121        92
VIS    2025250     91400   17.8300 -113.1600       4.9        80       137        90
VIS    2025250     91400   17.8200 -113.2600       5.1        50       125        96
VIS    2025250     91400   17.8200 -113.3000       4.5        46       122        94
VIS    2025250     91400   17.8100 -113.7100       4.2       311       141       100
VIS    2025250     91400   17.8100 -113.7300       4.4       322       140       100
VIS    2025250     91400   17.8000 -113.9600       4.5         3       143        98
VIS    2025250     91400   17.8100 -113.9800       4.6         5       139        98
VIS    2025250     91400   17.8100 -114.0100       4.2         7       137        96
VIS    2025250     91400   17.8200 -114.1400       4.1       340       145        99
VIS    2025250     91400   17.7900 -114.2000       4.4       332       152       100
VIS    2025250     91400   17.7900 -114.2200       4.4       328       154       100
VIS    2025250     91400   17.7900 -114.2400       4.6       328       157        99
VIS    2025250     91400   17.8000 -114.2800       5.5       333       160        97
VIS    2025250     91400   17.8100 -114.2900       5.7       333       161        98
VIS    2025250     91400   17.8100 -114.3200       5.1       325       158        90
VIS    2025250     91400   17.8000 -114.3600       4.5       327       158        96
VIS    2025250     91400   17.8100 -114.3900       4.4       334       157        99
VIS    2025250     91400   17.8000 -114.4000       4.2       335       157       100
VIS    2025250     91400   17.8100 -114.4400       4.5       339       158        98
VIS    2025250     91400   17.7900 -114.4600       4.4       339       160       100
VIS    2025250     91400   17.7900 -114.5100       4.7       340       160       100
VIS    2025250     91400   17.8100 -114.5300       4.4       343       156       100
VIS    2025250     91400   17.8000 -114.5400       4.1       345       156        99
VIS    2025250     91400   17.7800 -114.7400       5.0       354       174        98
VIS    2025250     91400   17.7900 -114.9900       4.1       285       180        98
VIS    2025250     91400   17.7600 -116.1500       7.6        60       182        99
VIS    2025250     91400   17.7500 -116.1800       7.8        62       184       100
VIS    2025250     91400   17.7600 -116.1900       6.3        65       187        93
VIS    2025250     91400   17.7400 -116.6900       5.1        21       182        97
VIS    2025250     91400   17.7400 -116.7100       6.2        24       182        95
VIS    2025250     91400   17.7400 -116.8500       4.5       300       185        90
VIS    2025250     91400   17.7000 -117.9900       5.3        33       190        98
VIS    2025250     91400   17.7000 -118.0000       4.8        39       190        92
VIS    2025250     91400   17.6900 -119.2500      16.1        22       160       100
VIS    2025250     91400   17.6800 -119.2800      15.8        25       153        95
VIS    2025250     91400   17.6800 -119.3500      15.8        26       147        99
VIS    2025250     91400   17.6700 -119.3800      16.5        27       147       100
VIS    2025250     91400   17.6600 -119.3900      15.8        26       148        98
VIS    2025250     91400   17.6800 -119.4100      12.9        20       152        98
VIS    2025250     91400   17.9100 -110.2200       9.9        72       173        97
VIS    2025250     91400   17.9000 -110.2300       9.6        70       172        98
VIS    2025250     91400   17.9000 -110.2700      13.3        64       160        95
VIS    2025250     91400   17.9000 -110.4000      10.2        50       147       100
VIS    2025250     91400   17.8800 -110.4300      10.0        50       147       100
VIS    2025250     91400   17.8900 -110.5200      16.1        67       139        99
VIS    2025250     91400   17.8900 -110.5600      13.5        72       128        99
VIS    2025250     91400   17.9000 -110.5700      13.0        72       128       100
VIS    2025250     91400   17.8900 -110.6000      12.7        72       129       100
VIS    2025250     91400   17.8900 -110.6400      13.0        70       130        99
VIS    2025250     91400   17.8900 -110.7600       9.6        86       142        97
VIS    2025250     91400   17.8800 -110.7900       9.6        75       148        99
VIS    2025250     91400   17.8800 -110.8100      10.2        75       146        99
VIS    2025250     91400   17.8900 -110.8400      10.3        80       145        90
VIS    2025250     91400   17.8800 -110.9300      12.0        67       160        90
VIS    2025250     91400   17.8800 -111.2100       9.5        90       157       100
VIS    2025250     91400   17.8800 -111.2200       9.5        90       157       100
VIS    2025250     91400   17.8700 -111.2600      10.3        86       163        99
VIS    2025250     91400   17.8700 -111.2800      11.7        83       163        95
VIS    2025250     91400   17.8700 -111.3200      12.5        87       168        96
VIS    2025250     91400   17.8700 -111.3500      11.9        83       168       100
VIS    2025250     91400   17.8700 -111.5000       8.8        53       142        92
VIS    2025250     91400   17.8700 -111.5100       9.0        54       136        94
VIS    2025250     91400   17.8500 -111.5700      10.6        66       133        98
VIS    2025250     91400   17.8600 -111.5900      11.1        64       129        99
VIS    2025250     91400   17.8600 -111.6000      11.0        64       129        99
VIS    2025250     91400   17.8600 -111.6400       9.6        65       128        93
VIS    2025250     91400   17.8600 -111.6600       8.7        67       130        92
VIS    2025250     91400   17.8600 -111.6900       9.9        62       133       100
VIS    2025250     91400   17.8400 -111.7400      10.1        59       137       100
VIS    2025250     91400   17.8600 -111.7700       9.1        55       131        99
VIS    2025250     91400   17.8600 -111.7800       9.2        52       131        98
VIS    2025250     91400   17.8500 -111.8100       8.8        45       129        95
VIS    2025250     91400   17.8400 -111.8800       9.7        65       132        90
VIS    2025250     91400   17.8400 -111.9000       9.3        65       131        96
VIS    2025250     91400   17.8300 -111.9300       8.7        64       130       100
VIS    2025250     91400   17.8300 -111.9600       8.8        59       131       100
VIS    2025250     91400   17.8300 -112.0100       8.6        63       131       100
VIS    2025250     91400   17.8400 -112.0300       8.7        63       132       100
VIS    2025250     91400   17.8400 -112.0700       9.2        60       131       100
VIS    2025250     91400   17.8500 -112.0800       8.7        66       128        99
VIS    2025250     91400   17.8500 -112.1200       8.6        65       125       100
VIS    2025250     91400   17.8500 -112.1500       8.9        68       122        96
VIS    2025250     91400   17.8300 -112.1600       9.4        66       122        93
VIS    2025250     91400   17.8300 -112.2100       8.9        62       121        99
VIS    2025250     91400   17.8200 -112.2700      10.8        67       115        92
VIS    2025250     91400   17.8200 -112.3000      11.1        63       114        91
VIS    2025250     91400   17.8300 -112.3100      11.3        61       113        92
VIS    2025250     91400   17.8100 -112.5900       4.8        30       111        98
VIS    2025250     91400   17.8100 -112.7400       4.1        29       117        95
VIS    2025250     91400   17.8100 -112.8300       4.0        55       122        92
VIS    2025250     91400   17.8000 -113.1800       4.2        91       139        93
VIS    2025250     91400   17.8100 -113.2100       5.0        74       134       100
VIS    2025250     91400   17.8200 -113.2600       5.0        50       125        94
VIS    2025250     91400   17.8100 -113.3000       4.9        41       122       100
VIS    2025250     91400   17.8000 -113.3300       5.0        27       128        99
VIS    2025250     91400   17.7800 -113.6600       4.1       342       145       100
VIS    2025250     91400   17.8000 -113.7100       4.3       314       141        97
VIS    2025250     91400   17.8000 -113.7700       4.1       344       136        98
VIS    2025250     91400   17.7900 -113.8500       4.0        20       132        99
VIS    2025250     91400   17.7800 -113.8800       4.4         7       134        98
VIS    2025250     91400   17.8000 -113.9400       4.0         5       149        99
VIS    2025250     91400   17.8000 -113.9700       4.7         1       143        99
VIS    2025250     91400   17.7900 -113.9800       4.8       359       140        98
VIS    2025250     91400   17.7900 -114.0300       4.0         0       138        98
VIS    2025250     91400   17.7700 -114.0800       4.6       356       142       100
VIS    2025250     91400   17.7800 -114.1000       4.5       360       143       100
VIS    2025250     91400   17.7800 -114.1300       4.3       354       145        99
VIS    2025250     91400   17.7700 -114.1500       4.1       349       147        99
VIS    2025250     91400   17.7700 -114.2000       4.8       339       150       100
VIS    2025250     91400   17.7800 -114.2000       4.7       335       152       100
VIS    2025250     91400   17.7900 -114.2400       4.8       327       157        99
VIS    2025250     91400   17.7700 -114.2700       5.3       322       157        98
VIS    2025250     91400   17.7700 -114.3600       4.5       333       158        99
VIS    2025250     91400   17.7700 -114.4000       4.3       331       159        98
VIS    2025250     91400   17.7700 -114.4000       4.3       332       159        98
VIS    2025250     91400   17.7600 -114.4400       4.5       339       159        99
VIS    2025250     91400   17.7800 -114.4600       4.5       340       160       100
VIS    2025250     91400   17.7600 -114.5000       4.8       339       161       100
VIS    2025250     91400   17.7700 -114.5300       4.5       342       161       100
VIS    2025250     91400   17.7600 -114.6700       4.2       341       172        97
VIS    2025250     91400   17.7700 -114.7100       4.4       342       173       100
VIS    2025250     91400   17.7600 -114.7400       4.4         6       175       100
VIS    2025250     91400   17.7700 -114.8900       4.4       316       181       100
VIS    2025250     91400   17.7500 -115.0000       4.0       349       187        95
VIS    2025250     91400   17.7200 -116.1700       9.8        65       181        91
VIS    2025250     91400   17.7100 -116.7100       4.8        29       180        99
VIS    2025250     91400   17.7000 -116.7200       4.6        31       180        98
VIS    2025250     91400   17.7200 -116.8800       4.7       284       183        99
VIS    2025250     91400   17.6900 -117.9800       5.3        30       190        98
VIS    2025250     91400   17.6500 -119.2600      14.3        21       159        96
VIS    2025250     91400   17.6500 -119.3000      14.8        25       155        98
VIS    2025250     91400   17.6500 -119.3100      16.0        24       154        92
VIS    2025250     91400   17.6400 -119.3600      16.4        23       149       100
VIS    2025250     91400   17.6600 -119.3800      16.4        27       147       100
VIS    2025250     91400   17.6400 -119.4100      13.9        25       144        91
VIS    2025250     91400   17.6400 -119.4200      13.7        24       144        91
VIS    2025250     91400   17.8700 -110.2400       9.8        71       165        91
VIS    2025250     91400   17.8600 -110.3100      13.2        82       155       100
VIS    2025250     91400   17.8600 -110.4000       9.9        54       152        94
VIS    2025250     91400   17.8500 -110.4300      10.3        52       150        97
VIS    2025250     91400   17.8700 -110.4900      16.6        70       143        99
VIS    2025250     91400   17.8500 -110.5200      15.8        75       145        99
VIS    2025250     91400   17.8600 -110.5500      16.7        73       139       100
VIS    2025250     91400   17.8600 -110.5700      14.4        70       134       100
VIS    2025250     91400   17.8500 -110.6200      11.2        66       132        99
VIS    2025250     91400   17.8600 -110.6300      10.8        64       134        99
VIS    2025250     91400   17.8500 -110.6600      10.0        55       139        95
VIS    2025250     91400   17.8400 -110.7700       7.3        74       144        97
VIS    2025250     91400   17.8400 -110.7900       8.1        70       144        98
VIS    2025250     91400   17.8400 -110.8300       9.5        73       140       100
VIS    2025250     91400   17.8400 -110.8400       9.6        74       140        99
VIS    2025250     91400   17.8400 -110.9100       8.8        70       151        99
VIS    2025250     91400   17.8500 -111.3600      11.8        83       168        98
VIS    2025250     91400   17.8200 -111.4200      11.3        83       161        94
VIS    2025250     91400   17.8200 -111.4400      10.8        85       160       100
VIS    2025250     91400   17.8200 -111.4600       9.8        84       160        98
VIS    2025250     91400   17.8400 -111.5100       8.3        67       144        95
VIS    2025250     91400   17.8200 -111.5400       9.1        67       144        96
VIS    2025250     91400   17.8400 -111.5600      10.2        66       134        96
VIS    2025250     91400   17.8200 -111.6000      10.4        66       133        97
VIS    2025250     91400   17.8200 -111.6100      10.4        66       133        97
VIS    2025250     91400   17.8200 -111.6600       9.6        52       134        95
VIS    2025250     91400   17.8200 -111.6700       9.7        53       135        96
VIS    2025250     91400   17.8200 -111.7100      10.4        53       141       100
VIS    2025250     91400   17.8300 -111.7400      10.3        57       138       100
VIS    2025250     91400   17.8200 -111.7600      10.1        53       141        96
VIS    2025250     91400   17.8200 -111.8100      13.3        55       135       100
VIS    2025250     91400   17.8300 -111.8200      13.2        56       135       100
VIS    2025250     91400   17.8300 -111.8500      12.6        58       135        97
VIS    2025250     91400   17.8300 -111.8900       9.5        66       132        95
VIS    2025250     91400   17.8200 -111.9200       8.7        67       131       100
VIS    2025250     91400   17.8300 -111.9300       8.8        64       131       100
VIS    2025250     91400   17.8100 -111.9800       8.7        65       133       100
VIS    2025250     91400   17.8300 -112.0100       8.5        63       133        99
VIS    2025250     91400   17.8300 -112.0400       8.9        59       133       100
VIS    2025250     91400   17.8300 -112.0600       9.1        57       133       100
VIS    2025250     91400   17.8200 -112.0900      10.4        56       127        97
VIS    2025250     91400   17.8000 -112.1100      10.7        61       127        98
VIS    2025250     91400   17.8200 -112.1500       9.7        64       123        95
VIS    2025250     91400   17.8200 -112.1600       9.4        65       122        93
VIS    2025250     91400   17.8100 -112.2100       8.3        62       121        99
VIS    2025250     91400   17.8200 -112.2400       9.7        67       116        92
VIS    2025250     91400   17.8100 -112.2700      11.1        67       116        97
VIS    2025250     91400   17.8000 -112.2800      11.1        63       116        98
VIS    2025250     91400   17.8200 -112.3200      11.2        61       115        91
VIS    2025250     91400   17.8100 -112.5500       6.4        32       108        92
VIS    2025250     91400   17.8100 -112.5800       5.2        28       111        99
VIS    2025250     91400   17.7900 -112.6100       5.5        23       116        99
VIS    2025250     91400   17.8000 -112.6500       4.9        31       122       100
VIS    2025250     91400   17.7900 -112.6700       4.8        32       122       100
VIS    2025250     91400   17.8000 -112.7700       5.2        30       119        92
VIS    2025250     91400   17.8000 -112.7700       5.1        32       119        93
VIS    2025250     91400   17.8000 -112.8000       4.2        42       120        90
VIS    2025250     91400   17.7900 -112.8900       4.0        73       123        99
VIS    2025250     91400   17.7800 -112.9400       4.4        63       125        99
VIS    2025250     91400   17.7900 -113.2400       4.6        54       134        91
VIS    2025250     91400   17.7900 -113.3100       5.1        33       128       100
VIS    2025250     91400   17.7900 -113.3200       5.0        27       128        99
VIS    2025250     91400   17.7800 -113.3500       4.7        20       131       100
VIS    2025250     91400   17.7800 -113.5700       4.3       350       133        97
VIS    2025250     91400   17.7800 -113.6000       4.7       338       136        91
VIS    2025250     91400   17.7600 -113.6100       4.9       338       136        98
VIS    2025250     91400   17.7800 -113.6500       4.0       348       139       100
VIS    2025250     91400   17.7700 -113.6700       4.1       345       145       100
VIS    2025250     91400   17.7700 -113.7200       5.0       333       142       100
VIS    2025250     91400   17.7700 -113.7400       5.1       338       142        97
VIS    2025250     91400   17.7600 -113.7800       4.9       335       137        95
VIS    2025250     91400   17.7700 -113.7800       5.2       336       136        96
VIS    2025250     91400   17.7800 -113.8100       4.5       349       135        99
VIS    2025250     91400   17.7600 -113.8600       4.3         5       131       100
VIS    2025250     91400   17.7500 -113.8900       5.1         2       137       100
VIS    2025250     91400   17.7700 -113.9200       4.6        10       139        98
VIS    2025250     91400   17.7500 -113.9400       5.0         2       140       100
VIS    2025250     91400   17.7600 -113.9600       4.5         1       140        99
VIS    2025250     91400   17.7700 -113.9800       4.4       355       139        97
VIS    2025250     91400   17.7700 -114.0400       4.1       358       139        98
VIS    2025250     91400   17.7700 -114.0800       4.8       355       142       100
VIS    2025250     91400   17.7600 -114.1000       4.9       355       142        99
VIS    2025250     91400   17.7600 -114.1400       4.4       352       144        98
VIS    2025250     91400   17.7600 -114.1600       4.2       348       147        99
VIS    2025250     91400   17.7500 -114.2000       5.0       340       149        99
VIS    2025250     91400   17.7600 -114.2100       5.0       336       152       100
VIS    2025250     91400   17.7400 -114.2600       5.8       328       155        97
VIS    2025250     91400   17.7400 -114.2700       5.7       325       156        98
VIS    2025250     91400   17.7400 -114.3000       5.3       325       157        90
VIS    2025250     91400   17.7500 -114.3600       4.0       328       159        99
VIS    2025250     91400   17.7400 -114.4000       4.6       341       161        98
VIS    2025250     91400   17.7500 -114.4200       4.3       339       159       100
VIS    2025250     91400   17.7500 -114.4500       4.5       342       159       100
VIS    2025250     91400   17.7500 -114.4900       4.9       340       161       100
VIS    2025250     91400   17.7400 -114.4900       5.0       340       161       100
VIS    2025250     91400   17.7500 -114.5200       4.6       341       161       100
VIS    2025250     91400   17.7300 -114.5700       4.1       343       163       100
VIS    2025250     91400   17.7400 -114.6800       4.9       347       172       100
VIS    2025250     91400   17.7500 -114.7000       4.7       348       172       100
VIS    2025250     91400   17.7400 -114.8700       4.1       318       183       100
VIS    2025250     91400   17.7100 -116.1700       9.4        64       182        90
VIS    2025250     91400   17.6800 -116.7100       4.7        31       183        99
VIS    2025250     91400   17.7000 -116.7200       4.7        31       182        94
VIS    2025250     91400   17.6800 -116.7500       5.2        39       185        95
VIS    2025250     91400   17.6700 -117.0400       6.9        13       176        99
VIS    2025250     91400   17.6700 -117.0500       7.7        11       175        96
VIS    2025250     91400   17.6700 -117.0800       8.2        13       174        97
VIS    2025250     91400   17.6600 -118.1500      12.4        31       189        94
VIS    2025250     91400   17.6600 -118.1900      12.9        31       184        97
VIS    2025250     91400   17.6600 -118.2100      13.1        26       184        97
VIS    2025250     91400   17.6400 -119.2600      14.4        22       159        97
VIS    2025250     91400   17.6200 -119.2900      15.2        21       157        97
VIS    2025250     91400   17.6200 -119.3300      15.4        21       153        96
VIS    2025250     91400   17.6200 -119.3400      15.4        21       152        98
VIS    2025250     91400   17.6200 -119.3800      15.2        25       145       100
VIS    2025250     91400   17.6300 -119.4100      16.1        29       145        97
VIS    2025250     91400   17.6300 -119.4200      13.8        26       144        90
VIS    2025250     91400   17.8400 -110.1400       8.9        74       180       100
VIS    2025250     91400   17.8300 -110.2800      12.4        88       159       100
VIS    2025250     91400   17.8500 -110.3100      12.9        83       155       100
VIS    2025250     91400   17.8500 -110.3300      13.1        80       152        98
VIS    2025250     91400   17.8500 -110.3700       9.6        58       153        90
VIS    2025250     91400   17.8400 -110.4200      10.1        53       152        91
VIS    2025250     91400   17.8400 -110.4200      10.2        53       152        91
VIS    2025250     91400   17.8300 -110.4700      16.2        83       150        98
VIS    2025250     91400   17.8400 -110.4800      16.1        79       149        98
VIS    2025250     91400   17.8500 -110.5200      15.6        76       145        99
VIS    2025250     91400   17.8500 -110.5400      15.6        74       144       100
VIS    2025250     91400   17.8400 -110.5700      16.1        71       135       100
VIS    2025250     91400   17.8300 -110.6200      11.6        62       135        98
VIS    2025250     91400   17.8400 -110.6300      10.3        62       135        98
VIS    2025250     91400   17.8300 -110.6600       9.2        51       144        91
VIS    2025250     91400   17.8400 -110.7000       9.5        57       144        90
VIS    2025250     91400   17.8400 -110.7300       8.6        68       143        92
VIS    2025250     91400   17.8200 -110.7700       7.2        69       143        94
VIS    2025250     91400   17.8200 -110.8100       8.8        68       141        99
VIS    2025250     91400   17.8300 -110.8100       9.0        69       141       100
VIS    2025250     91400   17.8200 -110.8600       9.3        73       139        98
VIS    2025250     91400   17.8300 -110.8700       9.3        73       139        98
VIS    2025250     91400   17.8200 -110.9300       9.1        71       152       100
VIS    2025250     91400   17.8200 -110.9300       9.2        70       155       100
VIS    2025250     91400   17.8200 -111.1600      10.7        81       158        99
VIS    2025250     91400   17.8200 -111.1700      10.5        82       158       100
VIS    2025250     91400   17.8100 -111.2300       8.6        86       151       100
VIS    2025250     91400   17.8200 -111.2500      11.3        69       153       100
VIS    2025250     91400   17.8100 -111.2600      11.2        72       151        99
VIS    2025250     91400   17.8000 -111.3400      10.1        62       156        97
VIS    2025250     91400   17.8000 -111.3500      10.1        62       156        98
VIS    2025250     91400   17.8000 -111.4100       9.5        75       160        97
VIS    2025250     91400   17.8100 -111.4600      10.4        84       160       100
VIS    2025250     91400   17.8100 -111.4700      10.2        84       160        99
VIS    2025250     91400   17.8100 -111.5100       8.7        77       157        94
VIS    2025250     91400   17.8000 -111.5400       9.0        69       153        99
VIS    2025250     91400   17.8100 -111.5600      10.1        66       140        93
VIS    2025250     91400   17.8000 -111.6100      11.1        62       136        91
VIS    2025250     91400   17.8100 -111.6100      10.8        63       136        97
VIS    2025250     91400   17.8100 -111.6600       9.8        50       134        96
VIS    2025250     91400   17.7900 -111.6700      10.5        45       136        97
VIS    2025250     91400   17.8100 -111.7100      10.3        53       142       100
VIS    2025250     91400   17.8000 -111.7400      10.1        55       142        95
VIS    2025250     91400   17.8000 -111.7700      11.0        54       141        96
VIS    2025250     91400   17.7900 -111.8400      13.6        55       135       100
VIS    2025250     91400   17.8000 -111.8500      12.8        56       135        99
VIS    2025250     91400   17.8000 -111.9000      10.6        64       131        97
VIS    2025250     91400   17.8100 -111.9000       9.9        65       131        99
VIS    2025250     91400   17.7900 -111.9400       9.7        61       133        95
VIS    2025250     91400   17.7900 -111.9700       8.9        62       134       100
VIS    2025250     91400   17.8000 -112.0100       8.9        63       134       100
VIS    2025250     91400   17.8000 -112.0500       9.2        50       134       100
VIS    2025250     91400   17.8000 -112.1000      10.5        60       129        98
VIS    2025250     91400   17.8000 -112.1200      10.8        62       127        98
VIS    2025250     91400   17.8000 -112.1600      10.2        62       124        90
VIS    2025250     91400   17.7900 -112.1700       9.8        61       124        90
VIS    2025250     91400   17.7800 -112.2100       7.7        65       124        90
VIS    2025250     91400   17.7900 -112.2600      10.8        65       117       100
VIS    2025250     91400   17.7900 -112.2900      10.8        60       116       100
VIS    2025250     91400   17.7900 -112.3100      11.1        58       116        96
VIS    2025250     91400   17.7800 -112.3900      12.5        68       111        99
VIS    2025250     91400   17.7800 -112.5300       9.6        31       115        97
VIS    2025250     91400   17.7700 -112.5700       6.5        34       117        99
VIS    2025250     91400   17.7700 -112.5800       6.2        31       117       100
VIS    2025250     91400   17.7600 -112.6100       6.5        27       119       100
VIS    2025250     91400   17.7600 -112.6600       6.1        29       120       100
VIS    2025250     91400   17.7800 -112.6800       5.1        31       120        99
VIS    2025250     91400   17.7600 -112.7100       5.3        26       125        96
VIS    2025250     91400   17.7700 -112.7500       4.9        25       122        97
VIS    2025250     91400   17.7600 -112.7600       5.3        24       122        95
VIS    2025250     91400   17.7600 -112.8300       5.5        37       121        92
VIS    2025250     91400   17.7600 -112.8400       4.9        44       121        99
VIS    2025250     91400   17.7600 -112.8900       4.4        52       122        99
VIS    2025250     91400   17.7600 -112.9000       4.2        57       122       100
VIS    2025250     91400   17.7800 -112.9400       4.5        60       125        99
VIS    2025250     91400   17.7700 -112.9800       4.2        55       124       100
VIS    2025250     91400   17.7600 -113.0000       4.4        48       127       100
VIS    2025250     91400   17.7600 -113.2800       5.4        35       132        92
VIS    2025250     91400   17.7600 -113.3200       5.3        23       129        99
VIS    2025250     91400   17.7400 -113.3400       5.1        18       132        99
VIS    2025250     91400   17.7600 -113.3700       4.7        22       132        97
VIS    2025250     91400   17.7500 -113.3900       5.2        24       132        98
VIS    2025250     91400   17.7500 -113.4400       4.8         1       133       100
VIS    2025250     91400   17.7400 -113.4500       5.2         1       133        99
VIS    2025250     91400   17.7500 -113.4800       4.3       355       140        97
VIS    2025250     91400   17.7500 -113.5100       4.6         1       140       100
VIS    2025250     91400   17.7500 -113.5400       5.1       360       137       100
VIS    2025250     91400   17.7400 -113.5800       6.1       351       132        98
VIS    2025250     91400   17.7400 -113.5900       6.1       348       132        99
VIS    2025250     91400   17.7600 -113.6200       4.9       340       137        97
VIS    2025250     91400   17.7600 -113.6400       4.4       346       138       100
VIS    2025250     91400   17.7500 -113.6700       4.3       344       144       100
VIS    2025250     91400   17.7400 -113.7100       5.2       336       143        98
VIS    2025250     91400   17.7500 -113.7300       5.2       339       142        99
VIS    2025250     91400   17.7400 -113.7800       4.4       345       140        99
VIS    2025250     91400   17.7400 -113.7900       4.4       347       139        98
VIS    2025250     91400   17.7400 -113.8200       5.1       358       137        99
VIS    2025250     91400   17.7300 -113.8700       5.4         4       138        95
VIS    2025250     91400   17.7300 -113.8900       5.1         5       139        98
VIS    2025250     91400   17.7400 -113.9200       5.3         3       140       100
VIS    2025250     91400   17.7500 -113.9400       5.2         1       140       100
VIS    2025250     91400   17.7300 -113.9600       5.3       358       139       100
VIS    2025250     91400   17.7300 -113.9900       4.2         4       141        98
VIS    2025250     91400   17.7200 -114.0300       4.9         6       141        99
VIS    2025250     91400   17.7200 -114.0500       5.4         2       141        99
VIS    2025250     91400   17.7200 -114.0800       5.3       356       140       100
VIS    2025250     91400   17.7400 -114.1200       4.6       353       141        98
VIS    2025250     91400   17.7300 -114.1400       4.6       351       139        99
VIS    2025250     91400   17.7300 -114.1600       4.8       349       139        98
VIS    2025250     91400   17.7200 -114.2000       5.3       342       149        98
VIS    2025250     91400   17.7200 -114.2300       5.3       334       152        99
VIS    2025250     91400   17.7300 -114.2600       5.8       330       156        97
VIS    2025250     91400   17.7400 -114.2700       5.7       327       156        98
VIS    2025250     91400   17.7200 -114.3100       5.9       331       158        99
VIS    2025250     91400   17.7300 -114.3400       4.5       330       160        90
VIS    2025250     91400   17.7300 -114.3600       4.0       322       161       100
VIS    2025250     91400   17.7300 -114.4000       4.5       343       160        99
VIS    2025250     91400   17.7200 -114.4200       4.4       347       160       100
VIS    2025250     91400   17.7300 -114.4400       4.5       346       160        99
VIS    2025250     91400   17.7300 -114.4900       5.0       342       162       100
VIS    2025250     91400   17.7300 -114.5100       4.9       343       162        99
VIS    2025250     91400   17.7200 -114.5500       4.5       348       163        99
VIS    2025250     91400   17.7300 -114.5600       4.1       343       163       100
VIS    2025250     91400   17.7300 -114.6600       5.0       345       172        98
VIS    2025250     91400   17.7200 -114.6900       4.7       349       173        99
VIS    2025250     91400   17.6700 -116.0300       5.2        35       178       100
VIS    2025250     91400   17.6900 -116.0400       5.3        33       177        99
VIS    2025250     91400   17.6700 -116.0700       8.0        68       186        96
VIS    2025250     91400   17.6700 -116.1200       6.2        74       187        90
VIS    2025250     91400   17.6700 -116.1900       8.9        64       185        92
VIS    2025250     91400   17.6700 -116.7200       5.6        22       185        94
VIS    2025250     91400   17.6700 -116.7300       5.3        36       187        98
VIS    2025250     91400   17.6600 -116.7600       7.2        42       189        92
VIS    2025250     91400   17.6700 -117.0200       4.7        51       177        95
VIS    2025250     91400   17.6700 -117.0500       7.8        10       175        95
VIS    2025250     91400   17.6600 -117.0800       8.6        11       172        97
VIS    2025250     91400   17.6300 -118.2100      11.6        40       186        98
VIS    2025250     91400   17.6000 -119.2800      15.1        19       159        99
VIS    2025250     91400   17.6100 -119.2900      15.6        19       157        96
VIS    2025250     91400   17.6000 -119.3900      15.3        27       144        99
VIS    2025250     91400   17.6000 -119.4000      15.7        29       144       100
VIS    2025250     91400   17.8100 -110.1300       9.3        90       178        96
VIS    2025250     91400   17.8200 -110.2100      12.0        69       170        90
VIS    2025250     91400   17.8300 -110.2400      11.9        76       165        98
VIS    2025250     91400   17.8100 -110.2500      12.4        87       163       100
VIS    2025250     91400   17.8200 -110.2800      12.7        89       163       100
VIS    2025250     91400   17.8100 -110.3700       8.9        54       154        91
VIS    2025250     91400   17.8200 -110.3800       9.5        51       155        95
VIS    2025250     91400   17.8200 -110.4000       9.1        50       154        98
VIS    2025250     91400   17.8200 -110.4700      16.0        84       151        96
VIS    2025250     91400   17.8200 -110.5200      13.7        74       148       100
VIS    2025250     91400   17.8000 -110.5600      12.2        72       139       100
VIS    2025250     91400   17.8000 -110.6100      11.7        67       138        96
VIS    2025250     91400   17.8000 -110.6100      11.8        66       138        94
VIS    2025250     91400   17.8000 -110.7200       8.2        64       145        93
VIS    2025250     91400   17.8100 -110.7300       8.0        66       144        95
VIS    2025250     91400   17.8000 -110.7700       6.8        68       144        94
VIS    2025250     91400   17.8000 -110.8000       8.0        69       141        98
VIS    2025250     91400   17.7900 -110.8300       9.2        71       139       100
VIS    2025250     91400   17.7900 -110.8700       9.1        72       145       100
VIS    2025250     91400   17.7900 -110.8900       9.1        71       153       100
VIS    2025250     91400   17.8100 -110.9200       9.1        67       154       100
VIS    2025250     91400   17.7900 -110.9500       9.4        70       160        98
VIS    2025250     91400   17.7800 -111.1600      11.4        82       158       100
VIS    2025250     91400   17.7900 -111.2200       8.7        85       157        99
VIS    2025250     91400   17.7900 -111.2400       9.5        83       150        98
VIS    2025250     91400   17.8000 -111.2700      11.7        72       148        99
VIS    2025250     91400   17.7800 -111.3100      10.1        65       144        97
VIS    2025250     91400   17.7900 -111.3300       9.9        63       153        98
VIS    2025250     91400   17.7800 -111.3700       9.5        63       138       100
VIS    2025250     91400   17.7700 -111.4100       8.3        67       149       100
VIS    2025250     91400   17.7700 -111.4200       8.3        69       155       100
VIS    2025250     91400   17.7700 -111.4400       8.8        74       160       100
VIS    2025250     91400   17.7800 -111.4700       8.7        79       161        95
VIS    2025250     91400   17.7900 -111.5500       8.9        69       153        99
VIS    2025250     91400   17.7800 -111.5700       8.9        69       153        96
VIS    2025250     91400   17.7900 -111.6600      10.7        41       136        96
VIS    2025250     91400   17.7900 -111.6800      10.6        43       138        94
VIS    2025250     91400   17.7700 -111.7300      10.1        62       142       100
VIS    2025250     91400   17.7700 -111.7400      10.4        64       143        95
VIS    2025250     91400   17.7700 -111.7800      11.6        60       142        95
VIS    2025250     91400   17.7700 -111.8000      13.2        57       143        97
VIS    2025250     91400   17.7800 -111.8400      13.8        55       135       100
VIS    2025250     91400   17.7800 -111.8700      12.7        57       134        98
VIS    2025250     91400   17.7700 -111.8800      13.7        54       134       100
VIS    2025250     91400   17.7600 -111.9300      12.4        56       134        99
VIS    2025250     91400   17.7600 -111.9600      10.4        58       138        97
VIS    2025250     91400   17.7700 -111.9800       9.7        58       138        99
VIS    2025250     91400   17.7700 -112.0200      10.9        44       135        97
VIS    2025250     91400   17.7700 -112.0300      11.4        43       135        96
VIS    2025250     91400   17.7600 -112.0700      10.2        52       139        92
VIS    2025250     91400   17.7700 -112.0900       9.8        57       137        96
VIS    2025250     91400   17.7500 -112.1400      11.6        59       133        97
VIS    2025250     91400   17.7700 -112.1700      10.6        59       125        92
VIS    2025250     91400   17.7700 -112.1800      10.5        59       125        91
VIS    2025250     91400   17.7700 -112.2000       8.2        61       124        93
VIS    2025250     91400   17.7700 -112.3700      12.1        75       112        94
VIS    2025250     91400   17.7600 -112.4000      12.5        66       111       100
VIS    2025250     91400   17.7600 -112.4100      12.5        64       111       100
VIS    2025250     91400   17.7600 -112.5100      10.3        32       117        99
VIS    2025250     91400   17.7500 -112.5400       9.2        34       117       100
VIS    2025250     91400   17.7600 -112.5800       6.5        35       119        99
VIS    2025250     91400   17.7600 -112.5900       6.3        32       120        99
VIS    2025250     91400   17.7400 -112.6300       6.7        30       124        99
VIS    2025250     91400   17.7500 -112.6600       6.7        29       121        99
VIS    2025250     91400   17.7600 -112.6700       6.1        28       120        99
VIS    2025250     91400   17.7500 -112.7000       6.5        23       124        96
VIS    2025250     91400   17.7500 -112.7400       6.0        24       125        93
VIS    2025250     91400   17.7600 -112.7600       5.3        24       124        94
VIS    2025250     91400   17.7400 -112.7900       5.5        31       123        96
VIS    2025250     91400   17.7500 -112.8300       5.6        37       122        91
VIS    2025250     91400   17.7500 -112.8400       5.2        42       122        98
VIS    2025250     91400   17.7400 -112.8900       5.3        39       124        95
VIS    2025250     91400   17.7500 -112.9100       4.6        48       124       100
VIS    2025250     91400   17.7500 -112.9500       4.8        44       127       100
VIS    2025250     91400   17.7300 -112.9600       5.1        43       130       100
VIS    2025250     91400   17.7300 -112.9900       5.4        46       129       100
VIS    2025250     91400   17.7400 -113.0200       4.7        54       128        95
VIS    2025250     91400   17.7400 -113.2800       5.8        28       133        90
VIS    2025250     91400   17.7300 -113.3300       5.6        21       132        93
VIS    2025250     91400   17.7300 -113.3300       5.4        18       132        94
VIS    2025250     91400   17.7400 -113.3700       4.8        20       133       100
VIS    2025250     91400   17.7300 -113.4100       5.8        21       134       100
VIS    2025250     91400   17.7300 -113.4400       6.0         8       133       100
VIS    2025250     91400   17.7300 -113.4500       5.9         4       133        99
VIS    2025250     91400   17.7100 -113.5000       5.4       357       141       100
VIS    2025250     91400   17.7300 -113.5300       5.0         0       141       100
VIS    2025250     91400   17.7200 -113.5600       5.3         3       137        99
VIS    2025250     91400   17.7100 -113.5600       5.3         2       137        99
VIS    2025250     91400   17.7100 -113.6100       6.7       351       135       100
VIS    2025250     91400   17.7100 -113.6700       4.8       339       144        93
VIS    2025250     91400   17.7200 -113.6800       5.0       332       144       100
VIS    2025250     91400   17.7200 -113.7200       5.4       335       144        99
VIS    2025250     91400   17.7300 -113.7500       4.9       345       143       100
VIS    2025250     91400   17.7300 -113.7800       4.5       350       140       100
VIS    2025250     91400   17.7300 -113.7900       4.6       350       140       100
VIS    2025250     91400   17.7100 -113.8300       5.4       359       139        99
VIS    2025250     91400   17.7100 -113.8500       6.0         5       137        91
VIS    2025250     91400   17.7200 -113.8900       5.3         6       139        95
VIS    2025250     91400   17.7100 -113.9200       5.3         4       139       100
VIS    2025250     91400   17.7100 -113.9400       5.4       360       139       100
VIS    2025250     91400   17.7100 -113.9700       5.1         1       139        99
VIS    2025250     91400   17.7100 -114.0100       4.8         2       141       100
VIS    2025250     91400   17.7100 -114.0200       4.8         4       141        99
VIS    2025250     91400   17.7100 -114.0600       5.3       360       141       100
VIS    2025250     91400   17.7000 -114.0900       4.8       352       145       100
VIS    2025250     91400   17.7000 -114.1100       4.6       350       145       100
VIS    2025250     91400   17.7200 -114.1500       4.8       350       139        99
VIS    2025250     91400   17.7100 -114.1800       5.6       349       147        99
VIS    2025250     91400   17.7200 -114.2000       5.4       344       149        98
VIS    2025250     91400   17.6900 -114.2400       6.3       343       152        99
VIS    2025250     91400   17.7100 -114.2400       6.0       338       153        99
VIS    2025250     91400   17.6900 -114.2800       6.5       341       156        96
VIS    2025250     91400   17.7100 -114.3100       6.0       333       158        99
VIS    2025250     91400   17.7100 -114.3300       5.2       328       162       100
VIS    2025250     91400   17.6900 -114.3800       4.4       333       165        99
VIS    2025250     91400   17.7000 -114.3900       4.3       335       165       100
VIS    2025250     91400   17.6900 -114.4400       4.0       345       164       100
VIS    2025250     91400   17.7100 -114.4700       4.4       345       162        99
VIS    2025250     91400   17.6900 -114.4700       4.4       344       165        99
VIS    2025250     91400   17.7100 -114.5200       4.9       346       165       100
VIS    2025250     91400   17.7000 -114.5500       5.0       349       164        98
VIS    2025250     91400   17.7100 -114.5600       4.6       348       163        96
VIS    2025250     91400   17.6900 -114.5900       4.9       354       164        91
VIS    2025250     91400   17.7000 -114.6600       5.1       346       172        94
VIS    2025250     91400   17.6800 -114.6900       4.3       359       173        99
VIS    2025250     91400   17.6500 -116.0100       4.8        52       177        91
VIS    2025250     91400   17.6500 -116.0300       5.0        44       182        95
VIS    2025250     91400   17.6500 -116.0800       8.7        63       184        91
VIS    2025250     91400   17.6600 -116.1400       7.4        69       188        99
VIS    2025250     91400   17.6500 -116.1900       8.6        61       185        95
VIS    2025250     91400   17.6400 -116.2300       7.0        24       185        92
VIS    2025250     91400   17.6400 -116.2300       7.0        24       185        92
VIS    2025250     91400   17.6300 -116.6600      10.4        42       183        95
VIS    2025250     91400   17.6400 -116.7800       7.4        44       189        95
VIS    2025250     91400   17.6400 -117.0700       9.6         3       172        98
VIS    2025250     91400   17.5800 -119.2600      15.8        22       169       100
VIS    2025250     91400   17.5800 -119.2800      15.5        18       163       100
VIS    2025250     91400   17.5900 -119.3900      16.3        28       144       100
VIS    2025250     91400   17.5700 -119.4200      17.1        31       141       100
VIS    2025250     91400   17.7900 -110.0800      10.0        18       180        98
VIS    2025250     91400   17.7900 -110.1600      10.8        35       173        90
VIS    2025250     91400   17.7900 -110.2500      12.3        86       163        90
VIS    2025250     91400   17.7900 -110.4300      13.8        83       153        97
VIS    2025250     91400   17.7800 -110.5300      14.6        64       151        94
VIS    2025250     91400   17.7800 -110.5800      12.1        71       138       100
VIS    2025250     91400   17.7900 -110.6000      11.9        67       138        98
VIS    2025250     91400   17.7800 -110.7300       7.4        70       144        93
VIS    2025250     91400   17.7800 -110.7300       7.6        68       144        95
VIS    2025250     91400   17.7700 -110.7800       9.6        62       146        95
VIS    2025250     91400   17.7700 -110.8200       9.5        69       146        98
VIS    2025250     91400   17.7800 -110.8500       9.1        72       145        99
VIS    2025250     91400   17.7900 -110.8600       9.0        72       146        99
VIS    2025250     91400   17.7900 -110.8900       9.0        69       154       100
VIS    2025250     91400   17.7800 -110.9200       9.0        64       156        99
VIS    2025250     91400   17.7800 -110.9600       9.5        70       162        97
VIS    2025250     91400   17.7800 -110.9700       9.7        74       163        92
VIS    2025250     91400   17.7800 -111.0000      10.1        77       165        90
VIS    2025250     91400   17.7800 -111.1100      11.4        76       158        90
VIS    2025250     91400   17.7600 -111.1200      10.8        79       159        99
VIS    2025250     91400   17.7800 -111.1600      11.3        83       158        99
VIS    2025250     91400   17.7700 -111.1800      11.2        83       159        98
VIS    2025250     91400   17.7600 -111.2400       9.5        79       150        99
VIS    2025250     91400   17.7500 -111.2400       9.7        78       150        98
VIS    2025250     91400   17.7600 -111.2900      10.2        71       139        96
VIS    2025250     91400   17.7500 -111.3200       9.8        71       119        92
VIS    2025250     91400   17.7500 -111.3300       9.7        70       117        93
VIS    2025250     91400   17.7700 -111.3700       9.2        62       131       100
VIS    2025250     91400   17.7700 -111.4100       8.4        67       149       100
VIS    2025250     91400   17.7700 -111.4300       8.2        69       155       100
VIS    2025250     91400   17.7700 -111.4700       8.3        77       161        98
VIS    2025250     91400   17.7600 -111.4800       7.8        77       161        99
VIS    2025250     91400   17.7500 -111.5500       7.2        77       159       100
VIS    2025250     91400   17.7700 -111.5600       8.1        73       155       100
VIS    2025250     91400   17.7600 -111.6800      10.1        43       139        92
VIS    2025250     91400   17.7500 -111.7400      11.7        65       142        95
VIS    2025250     91400   17.7500 -111.7400      11.4        66       142        98
VIS    2025250     91400   17.7500 -111.7800      11.9        68       143        98
VIS    2025250     91400   17.7400 -111.8000      12.4        65       143        98
VIS    2025250     91400   17.7400 -111.8500      14.1        53       141       100
VIS    2025250     91400   17.7500 -111.8800      14.0        51       139       100
VIS    2025250     91400   17.7400 -111.9100      13.3        52       142       100
VIS    2025250     91400   17.7500 -111.9300      12.7        56       138        99
VIS    2025250     91400   17.7400 -111.9500      11.6        58       142        96
VIS    2025250     91400   17.7500 -111.9700      10.2        57       141       100
VIS    2025250     91400   17.7500 -112.0000       9.0        52       141       100
VIS    2025250     91400   17.7400 -112.0600      10.2        51       140        96
VIS    2025250     91400   17.7500 -112.0600      10.4        53       140        98
VIS    2025250     91400   17.7400 -112.0900      10.3        48       139        91
VIS    2025250     91400   17.7500 -112.1400      11.7        59       135        97
VIS    2025250     91400   17.7500 -112.1500      11.7        59       133        97
VIS    2025250     91400   17.7300 -112.2100      11.4        66       131        96
VIS    2025250     91400   17.7300 -112.3000      10.3        57       127        99
VIS    2025250     91400   17.7400 -112.3800       9.6        71       117        90
VIS    2025250     91400   17.7200 -112.5000      10.8        45       122       100
VIS    2025250     91400   17.7200 -112.5000      10.4        46       122        99
VIS    2025250     91400   17.7300 -112.5400       9.6        39       120        98
VIS    2025250     91400   17.7300 -112.5800       7.9        38       124        99
VIS    2025250     91400   17.7200 -112.6100       7.6        35       129        95
VIS    2025250     91400   17.7200 -112.6200       7.3        34       129        96
VIS    2025250     91400   17.7100 -112.6500       8.5        30       131        97
VIS    2025250     91400   17.7200 -112.7000       8.1        20       130        91
VIS    2025250     91400   17.7300 -112.7200       7.9        20       128        90
VIS    2025250     91400   17.7200 -112.7600       7.1        30       127        95
VIS    2025250     91400   17.7300 -112.7700       6.6        31       126        96
VIS    2025250     91400   17.7100 -112.8000       6.2        32       129        99
VIS    2025250     91400   17.7100 -112.8300       6.0        33       133        98
VIS    2025250     91400   17.7300 -112.8600       5.7        37       128        98
VIS    2025250     91400   17.7300 -112.8900       5.7        35       124        97
VIS    2025250     91400   17.7100 -112.9300       5.7        25       133        99
VIS    2025250     91400   17.7300 -112.9500       5.1        34       131       100
VIS    2025250     91400   17.7200 -112.9800       5.5        42       130       100
VIS    2025250     91400   17.7200 -112.9900       5.6        45       130        99
VIS    2025250     91400   17.7100 -113.3300       6.0        27       134        93
VIS    2025250     91400   17.7100 -113.3400       6.2        25       135        95
VIS    2025250     91400   17.7100 -113.4100       6.1        22       140        99
VIS    2025250     91400   17.7000 -113.4400       6.5        19       139        99
VIS    2025250     91400   17.7000 -113.4500       6.6        15       139        99
VIS    2025250     91400   17.7100 -113.4800       6.0         3       139       100
VIS    2025250     91400   17.6900 -113.5300       5.8         8       142        99
VIS    2025250     91400   17.7100 -113.5500       5.1         7       139       100
VIS    2025250     91400   17.7000 -113.5900       5.3       355       139       100
VIS    2025250     91400   17.7000 -113.6000       5.6       354       135       100
VIS    2025250     91400   17.7000 -113.6200       6.7       351       140        98
VIS    2025250     91400   17.7000 -113.6600       6.9       343       145        97
VIS    2025250     91400   17.7000 -113.6900       5.6       335       144       100
VIS    2025250     91400   17.6900 -113.7200       6.1       344       144       100
VIS    2025250     91400   17.7000 -113.7400       5.5       346       144       100
VIS    2025250     91400   17.7000 -113.7900       5.0       354       142       100
VIS    2025250     91400   17.7000 -113.8200       5.2       355       141       100
VIS    2025250     91400   17.7000 -113.8300       5.3       358       140        99
VIS    2025250     91400   17.7000 -113.8700       5.6         3       136        94
VIS    2025250     91400   17.6900 -113.9000       5.3         4       134        96
VIS    2025250     91400   17.6800 -113.9100       5.6         3       134        98
VIS    2025250     91400   17.6900 -113.9600       5.2       358       137        98
VIS    2025250     91400   17.6800 -113.9700       5.2       359       138        98
VIS    2025250     91400   17.6800 -114.0000       5.3       355       141        99
VIS    2025250     91400   17.6900 -114.0200       5.1       360       143       100
VIS    2025250     91400   17.6800 -114.0600       5.2       356       148       100
VIS    2025250     91400   17.6900 -114.0800       4.7       351       145       100
VIS    2025250     91400   17.6700 -114.1300       4.9       351       153        99
VIS    2025250     91400   17.6900 -114.1500       5.0       352       147        99
VIS    2025250     91400   17.6800 -114.1900       6.7       356       151       100
VIS    2025250     91400   17.6800 -114.1900       6.6       354       151        99
VIS    2025250     91400   17.6800 -114.2300       7.0       346       151        98
VIS    2025250     91400   17.6700 -114.2600       7.0       347       155        97
VIS    2025250     91400   17.6900 -114.2800       6.6       342       156        95
VIS    2025250     91400   17.6900 -114.3300       5.7       339       168        91
VIS    2025250     91400   17.6900 -114.3700       4.4       329       165        98
VIS    2025250     91400   17.6900 -114.3900       4.3       333       165        99
VIS    2025250     91400   17.6700 -114.4400       4.6       347       168        99
VIS    2025250     91400   17.6700 -114.4700       4.4       344       168        99
VIS    2025250     91400   17.6800 -114.4800       4.4       342       166        99
VIS    2025250     91400   17.6800 -114.5200       4.7       343       166       100
VIS    2025250     91400   17.6800 -114.5500       4.8       349       164       100
VIS    2025250     91400   17.6600 -114.5900       5.2       355       164        99
VIS    2025250     91400   17.6700 -114.6000       5.5       355       164        95
VIS    2025250     91400   17.6600 -114.6700       4.5         0       177        96
VIS    2025250     91400   17.6700 -114.6700       4.5       360       177        95
VIS    2025250     91400   17.6600 -114.7400       4.4         5       188       100
VIS    2025250     91400   17.6300 -115.8200       4.1        88       179       100
VIS    2025250     91400   17.6300 -115.8200       4.1        86       179        99
VIS    2025250     91400   17.6500 -115.9000       4.1        74       176        97
VIS    2025250     91400   17.6400 -116.0900       8.3        64       186        97
VIS    2025250     91400   17.6300 -116.1100       8.1        66       186        98
VIS    2025250     91400   17.6300 -116.2400       7.0        23       185        94
VIS    2025250     91400   17.6300 -116.6600      11.0        44       183        99
VIS    2025250     91400   17.5700 -118.1200       4.8       128       189        96
VIS    2025250     91400   17.5400 -119.3200      15.8        18       162        94
VIS    2025250     91400   17.5600 -119.3800      16.6        30       143        96
VIS    2025250     91400   17.5600 -119.4200      17.2        32       139       100
VIS    2025250     91400   17.7700 -110.0700       9.3        21       180        91
VIS    2025250     91400   17.7800 -110.0800       9.4        20       180        92
VIS    2025250     91400   17.7800 -110.2100      10.2        97       167        90
VIS    2025250     91400   17.7600 -110.2600      11.1        99       159        94
VIS    2025250     91400   17.7600 -110.5100      15.5        62       151        97
VIS    2025250     91400   17.7700 -110.5500      12.8        79       142       100
VIS    2025250     91400   17.7600 -110.5700      12.7        76       142        99
VIS    2025250     91400   17.7600 -110.6000      12.1        71       138        96
VIS    2025250     91400   17.7600 -110.6400      12.4        72       132        94
VIS    2025250     91400   17.7400 -110.7500       7.8        67       137        97
VIS    2025250     91400   17.7500 -110.7900      11.0        65       149        97
VIS    2025250     91400   17.7500 -110.8000      11.1        66       149        97
VIS    2025250     91400   17.7600 -110.8300       9.8        67       150       100
VIS    2025250     91400   17.7600 -110.8700       8.9        67       155        95
VIS    2025250     91400   17.7400 -110.9000       8.8        58       160        95
VIS    2025250     91400   17.7600 -110.9300       8.9        58       158       100
VIS    2025250     91400   17.7400 -110.9500       9.0        57       160       100
VIS    2025250     91400   17.7600 -110.9800       9.4        68       165        97
VIS    2025250     91400   17.7300 -111.1100      10.2        79       159        98
VIS    2025250     91400   17.7400 -111.1300      10.5        79       159        99
VIS    2025250     91400   17.7500 -111.2400       9.7        74       151        99
VIS    2025250     91400   17.7500 -111.2400       9.6        77       147        97
VIS    2025250     91400   17.7400 -111.3000       9.5        71       119        95
VIS    2025250     91400   17.7300 -111.3200       9.6        71       110        91
VIS    2025250     91400   17.7300 -111.3700       9.6        62       103        92
VIS    2025250     91400   17.7500 -111.4000       8.7        66       117        99
VIS    2025250     91400   17.7300 -111.4400       9.0        71       120        99
VIS    2025250     91400   17.7300 -111.4600       8.0        77       149        97
VIS    2025250     91400   17.7200 -111.5000       7.6        86       144        93
VIS    2025250     91400   17.7200 -111.5200       8.2        90       144        99
VIS    2025250     91400   17.7400 -111.5500       7.2        83       158       100
VIS    2025250     91400   17.7200 -111.5700       6.2        93       160        96
VIS    2025250     91400   17.7200 -111.6100       4.8        90       158        98
VIS    2025250     91400   17.7300 -111.6800       8.2        55       134        98
VIS    2025250     91400   17.7200 -111.7300      10.7        74       140        95
VIS    2025250     91400   17.7100 -111.7700      12.6        69       142        99
VIS    2025250     91400   17.7200 -111.7800      12.8        68       142        99
VIS    2025250     91400   17.7300 -111.8100      12.8        69       143        97
VIS    2025250     91400   17.7300 -111.8600      13.4        52       144        99
VIS    2025250     91400   17.7300 -111.8800      13.2        50       142        98
VIS    2025250     91400   17.7300 -111.9100      13.2        51       142       100
VIS    2025250     91400   17.7300 -111.9200      13.3        52       142       100
VIS    2025250     91400   17.7200 -111.9700      10.6        59       145        97
VIS    2025250     91400   17.7200 -111.9800      10.0        58       145        98
VIS    2025250     91400   17.7300 -112.0100       8.3        57       145        98
VIS    2025250     91400   17.7300 -112.0600       9.5        47       140        97
VIS    2025250     91400   17.7300 -112.0700       9.6        46       140        96
VIS    2025250     91400   17.7100 -112.1200      10.5        46       138        90
VIS    2025250     91400   17.7200 -112.1400      11.3        54       139        96
VIS    2025250     91400   17.7200 -112.1700      10.8        64       137       100
VIS    2025250     91400   17.7100 -112.2100      11.2        72       131        96
VIS    2025250     91400   17.7200 -112.2100      11.7        67       131        92
VIS    2025250     91400   17.7000 -112.2800      10.5        65       128        98
VIS    2025250     91400   17.7100 -112.3000      10.2        60       130       100
VIS    2025250     91400   17.7100 -112.3500       8.2        63       129        90
VIS    2025250     91400   17.7000 -112.4500       9.7        41       124        91
VIS    2025250     91400   17.7100 -112.5000      10.8        46       122       100
VIS    2025250     91400   17.7000 -112.5200      10.4        48       124        99
VIS    2025250     91400   17.7100 -112.5300      10.1        47       122       100
VIS    2025250     91400   17.6900 -112.5800       9.8        37       134        98
VIS    2025250     91400   17.7100 -112.6100       8.2        35       132        96
VIS    2025250     91400   17.7100 -112.6300       8.1        34       132        96
VIS    2025250     91400   17.7100 -112.6500       8.7        31       132        98
VIS    2025250     91400   17.7100 -112.6800       8.5        25       131        92
VIS    2025250     91400   17.6900 -112.8000       7.0        29       129        90
VIS    2025250     91400   17.6800 -112.8400       6.6        28       137       100
VIS    2025250     91400   17.6900 -112.8800       6.5        28       133       100
VIS    2025250     91400   17.7000 -112.9000       6.2        26       133        99
VIS    2025250     91400   17.6900 -112.9100       6.4        23       133       100
VIS    2025250     91400   17.6800 -112.9700       6.1        30       129       100
VIS    2025250     91400   17.6800 -112.9700       6.0        31       129       100
VIS    2025250     91400   17.6900 -113.0000       5.9        36       130        95
VIS    2025250     91400   17.6800 -113.1400       4.6        39       131       100
VIS    2025250     91400   17.6800 -113.1500       4.0        37       132        98
VIS    2025250     91400   17.6800 -113.2500       4.6       329       141        90
VIS    2025250     91400   17.6800 -113.3300       6.8        32       139        96
VIS    2025250     91400   17.6900 -113.3500       6.9        27       138       100
VIS    2025250     91400   17.6800 -113.3800       7.5        24       142        99
VIS    2025250     91400   17.6900 -113.4000       7.1        24       142        99
VIS    2025250     91400   17.6900 -113.4400       6.8        21       140       100
VIS    2025250     91400   17.6800 -113.4800       6.8        14       140       100
VIS    2025250     91400   17.6800 -113.4900       6.7        14       140       100
VIS    2025250     91400   17.6800 -113.5300       6.0        13       142        98
VIS    2025250     91400   17.6800 -113.5700       5.1         9       141        96
VIS    2025250     91400   17.6800 -113.5900       4.8       357       140        97
VIS    2025250     91400   17.6700 -113.6200       5.9       357       143        99
VIS    2025250     91400   17.6800 -113.6300       6.5       355       143        99
VIS    2025250     91400   17.6600 -113.6800       7.1       351       145        99
VIS    2025250     91400   17.6600 -113.6900       7.1       350       145        98
VIS    2025250     91400   17.6700 -113.7300       7.1       351       143       100
VIS    2025250     91400   17.6700 -113.7700       6.1       358       143       100
VIS    2025250     91400   17.6700 -113.7900       5.0       353       143       100
VIS    2025250     91400   17.6700 -113.8000       4.9       351       143       100
VIS    2025250     91400   17.6600 -113.8300       4.9       348       145       100
VIS    2025250     91400   17.6500 -113.8800       6.0       360       135        99
VIS    2025250     91400   17.6500 -113.8900       6.4         4       134       100
VIS    2025250     91400   17.6700 -113.9300       5.4         6       136        98
VIS    2025250     91400   17.6700 -113.9500       5.2         4       138        97
VIS    2025250     91400   17.6600 -113.9700       5.5       360       138        99
VIS    2025250     91400   17.6600 -114.0000       5.6       353       142        99
VIS    2025250     91400   17.6500 -114.0500       5.8       354       148       100
VIS    2025250     91400   17.6500 -114.0800       5.2       354       149        99
VIS    2025250     91400   17.6600 -114.0900       4.6       349       149        99
VIS    2025250     91400   17.6700 -114.1200       4.9       352       155        99
VIS    2025250     91400   17.6700 -114.1400       5.1       353       155        99
VIS    2025250     91400   17.6700 -114.1800       6.5       359       155        99
VIS    2025250     91400   17.6700 -114.2000       7.1       357       157       100
VIS    2025250     91400   17.6500 -114.2500       7.2       347       158        97
VIS    2025250     91400   17.6600 -114.2500       7.0       348       157        97
VIS    2025250     91400   17.6600 -114.2900       6.5       348       161        99
VIS    2025250     91400   17.6600 -114.3700       5.6       332       170        96
VIS    2025250     91400   17.6400 -114.4400       5.4       346       168       100
VIS    2025250     91400   17.6400 -114.4600       5.1       347       168        99
VIS    2025250     91400   17.6400 -114.4800       5.0       342       168        96
VIS    2025250     91400   17.6600 -114.5100       4.7       343       167        99
VIS    2025250     91400   17.6500 -114.5600       4.3       359       164        96
VIS    2025250     91400   17.6500 -114.5700       4.4       355       164        99
VIS    2025250     91400   17.6500 -114.5900       5.5       355       164       100
VIS    2025250     91400   17.6400 -114.6200       5.6       347       167        95
VIS    2025250     91400   17.6500 -114.7000       4.5         4       186       100
VIS    2025250     91400   17.6200 -115.8200       4.1        87       179       100
VIS    2025250     91400   17.6100 -115.8500       4.9        82       178        90
VIS    2025250     91400   17.5700 -118.1000      11.5         6       189        96
VIS    2025250     91400   17.5700 -118.1300       4.1       117       189       100
VIS    2025250     91400   17.5500 -118.2800       6.6        25       177        96
VIS    2025250     91400   17.5300 -119.2500      16.9        31       169       100
VIS    2025250     91400   17.5400 -119.3200      15.3        19       162        95
VIS    2025250     91400   17.5200 -119.3300      14.9        16       165        98
VIS    2025250     91400   17.5200 -119.4300      16.7        26       141       100
VIS    2025250     91400   17.5200 -119.4300      16.8        27       140       100
VIS    2025250     91400   17.7400 -109.9700       7.0        41       190        94
VIS    2025250     91400   17.7600 -110.0900       9.7        20       180        90
VIS    2025250     91400   17.7400 -110.1600      10.3        76       171        95
VIS    2025250     91400   17.7600 -110.2400      10.8       100       161        95
VIS    2025250     91400   17.7400 -110.2700      12.9        91       159       100
VIS    2025250     91400   17.7500 -110.3200       9.2        54       155       100
VIS    2025250     91400   17.7300 -110.3500      10.4        65       155        98
VIS    2025250     91400   17.7300 -110.3600      11.0        66       154        92
VIS    2025250     91400   17.7500 -110.5500      12.4        78       142       100
VIS    2025250     91400   17.7400 -110.5800      12.1        73       139        94
VIS    2025250     91400   17.7200 -110.6200      14.1        70       131        99
VIS    2025250     91400   17.7300 -110.6300      14.2        69       131        99
VIS    2025250     91400   17.7300 -110.6800      13.9        75       125        99
VIS    2025250     91400   17.7300 -110.6900      13.6        76       125        99
VIS    2025250     91400   17.7200 -110.7200      10.4        74       130        99
VIS    2025250     91400   17.7400 -110.7500       8.5        68       137        93
VIS    2025250     91400   17.7400 -110.8100      10.8        68       149        96
VIS    2025250     91400   17.7400 -110.8500       9.6        67       155        99
VIS    2025250     91400   17.7200 -110.8700       9.6        70       155       100
VIS    2025250     91400   17.7400 -110.9000       9.0        56       160        95
VIS    2025250     91400   17.7300 -110.9500       8.8        57       160       100
VIS    2025250     91400   17.7300 -110.9800       9.6        65       164        97
VIS    2025250     91400   17.7300 -110.9800       9.8        66       165        96
VIS    2025250     91400   17.7300 -111.0300       9.2        69       166        94
VIS    2025250     91400   17.7100 -111.0700       9.3        72       166        98
VIS    2025250     91400   17.7100 -111.0700       9.3        73       165        98
VIS    2025250     91400   17.7200 -111.2300       9.8        78       149       100
VIS    2025250     91400   17.7200 -111.2500       9.6        75       149        99
VIS    2025250     91400   17.7000 -111.3100      10.4        68       103        95
VIS    2025250     91400   17.7200 -111.3100       9.8        70       104        97
VIS    2025250     91400   17.7100 -111.3500      10.6        68       103        98
VIS    2025250     91400   17.7200 -111.3700       9.5        61       103        91
VIS    2025250     91400   17.7200 -111.4800       8.7        85       130        99
VIS    2025250     91400   17.7000 -111.5300       8.2        84       120        99
VIS    2025250     91400   17.7000 -111.5500       7.0        87       129        99
VIS    2025250     91400   17.7200 -111.5700       5.9        94       160        98
VIS    2025250     91400   17.7000 -111.6100       4.3        93       162       100
VIS    2025250     91400   17.6900 -111.6400       4.3        99       151       100
VIS    2025250     91400   17.7100 -111.6700       6.7        66       134        99
VIS    2025250     91400   17.7100 -111.7300      11.3        83       140        93
VIS    2025250     91400   17.6900 -111.7800      11.6        74       141        95
VIS    2025250     91400   17.7100 -111.7900      12.7        69       142        97
VIS    2025250     91400   17.7100 -111.8600      12.4        55       146       100
VIS    2025250     91400   17.6900 -111.8900      13.4        71       146        92
VIS    2025250     91400   17.6800 -112.1400       7.0        57       138        90
VIS    2025250     91400   17.6800 -112.2600      11.2        68       126        91
VIS    2025250     91400   17.6700 -112.2900      10.4        64       128        98
VIS    2025250     91400   17.6800 -112.3100      10.3        67       131        92
VIS    2025250     91400   17.6800 -112.3600       8.7        64       134        94
VIS    2025250     91400   17.6700 -112.4000       8.9        35       131        95
VIS    2025250     91400   17.6700 -112.4300      10.0        44       127        97
VIS    2025250     91400   17.6700 -112.4800      10.1        42       127        98
VIS    2025250     91400   17.6700 -112.5100       9.4        38       130       100
VIS    2025250     91400   17.6700 -112.5400       8.8        37       130       100
VIS    2025250     91400   17.6700 -112.5500       8.9        35       132       100
VIS    2025250     91400   17.6900 -112.5800       9.8        37       137        98
VIS    2025250     91400   17.6800 -112.6100      10.0        34       139        98
VIS    2025250     91400   17.6700 -112.6500      10.2        28       141        99
VIS    2025250     91400   17.6700 -112.8100       5.9        28       139        93
VIS    2025250     91400   17.6800 -112.8300       6.5        28       137       100
VIS    2025250     91400   17.6600 -112.8800       6.9        27       133       100
VIS    2025250     91400   17.6600 -112.8900       6.9        28       132       100
VIS    2025250     91400   17.6600 -112.9200       6.4        29       129       100
VIS    2025250     91400   17.6600 -112.9700       5.6        38       127       100
VIS    2025250     91400   17.6500 -113.0000       5.4        29       127        94
VIS    2025250     91400   17.6500 -113.0100       5.5        28       127        99
VIS    2025250     91400   17.6500 -113.0500       5.2        28       129        96
VIS    2025250     91400   17.6500 -113.0700       5.6        31       129        94
VIS    2025250     91400   17.6500 -113.1100       5.9        29       130        98
VIS    2025250     91400   17.6700 -113.1400       4.8        37       131       100
VIS    2025250     91400   17.6500 -113.1600       5.9        30       135        97
VIS    2025250     91400   17.6700 -113.2000       5.6         9       139        96
VIS    2025250     91400   17.6500 -113.2700       4.4         5       137       100
VIS    2025250     91400   17.6500 -113.2900       4.8        24       137        91
VIS    2025250     91400   17.6500 -113.3400       6.9        31       139        99
VIS    2025250     91400   17.6600 -113.3600       7.5        25       139       100
VIS    2025250     91400   17.6400 -113.4000       8.1        21       141       100
VIS    2025250     91400   17.6500 -113.4100       8.0        22       141       100
VIS    2025250     91400   17.6600 -113.4500       7.4        23       140       100
VIS    2025250     91400   17.6500 -113.4900       7.3        21       144       100
VIS    2025250     91400   17.6600 -113.5000       7.1        19       144       100
VIS    2025250     91400   17.6400 -113.5200       6.6        24       144       100
VIS    2025250     91400   17.6500 -113.5600       6.3        25       146        98
VIS    2025250     91400   17.6600 -113.5900       4.7        15       142        95
VIS    2025250     91400   17.6500 -113.6200       5.7        13       143       100
VIS    2025250     91400   17.6500 -113.6500       7.2         5       147        99
VIS    2025250     91400   17.6300 -113.6900       7.8       356       145       100
VIS    2025250     91400   17.6500 -113.7000       7.3       352       145        99
VIS    2025250     91400   17.6400 -113.7400       6.4       360       142       100
VIS    2025250     91400   17.6400 -113.7700       5.3         0       143       100
VIS    2025250     91400   17.6400 -113.8000       4.6       355       146        98
VIS    2025250     91400   17.6500 -113.8300       4.9       349       146       100
VIS    2025250     91400   17.6500 -113.8300       5.0       349       145       100
VIS    2025250     91400   17.6400 -113.8800       6.3         5       135       100
VIS    2025250     91400   17.6400 -113.9100       6.9        13       135       100
VIS    2025250     91400   17.6400 -113.9200       6.8        12       135       100
VIS    2025250     91400   17.6300 -113.9500       6.4        11       139        99
VIS    2025250     91400   17.6500 -113.9700       5.7         3       140        99
VIS    2025250     91400   17.6400 -114.0300       6.0       354       148        99
VIS    2025250     91400   17.6300 -114.0400       5.9       355       150        99
VIS    2025250     91400   17.6300 -114.0800       5.3       356       150       100
VIS    2025250     91400   17.6200 -114.1000       5.1       355       158        98
VIS    2025250     91400   17.6400 -114.1400       5.5       349       161        95
VIS    2025250     91400   17.6400 -114.1700       5.9       350       162        97
VIS    2025250     91400   17.6400 -114.1700       6.1       352       162        97
VIS    2025250     91400   17.6400 -114.2200       7.9       352       160        98
VIS    2025250     91400   17.6300 -114.2500       7.4       347       160        97
VIS    2025250     91400   17.6400 -114.2800       6.8       350       161        98
VIS    2025250     91400   17.6300 -114.3100       6.1       352       171       100
VIS    2025250     91400   17.6200 -114.3700       8.0       351       171       100
VIS    2025250     91400   17.6100 -114.4100       5.1       346       169        99
VIS    2025250     91400   17.6100 -114.4500       5.6       346       167       100
VIS    2025250     91400   17.6300 -114.4600       5.6       347       167        99
VIS    2025250     91400   17.6300 -114.4900       5.2       342       167        94
VIS    2025250     91400   17.6200 -114.5900       4.7       349       161        99
VIS    2025250     91400   17.6300 -114.6000       5.1       349       164       100
VIS    2025250     91400   17.6000 -115.2000       4.0       343       188        99
VIS    2025250     91400   17.5700 -115.9900       5.1        95       177        99
VIS    2025250     91400   17.5900 -116.0600       5.0        39       185        91
VIS    2025250     91400   17.5800 -116.3600       7.3        39       183        92
VIS    2025250     91400   17.5600 -116.3800       7.4        10       186        99
VIS    2025250     91400   17.5500 -117.0300       5.9        22       180        94
VIS    2025250     91400   17.5200 -118.0600      11.6         4       188        92
VIS    2025250     91400   17.5300 -118.0900      11.0       359       189        92
VIS    2025250     91400   17.5400 -118.1000      11.1       359       189        92
VIS    2025250     91400   17.5100 -119.3500      14.7        16       161        99
VIS    2025250     91400   17.4900 -119.3800      14.3        22       150        98
VIS    2025250     91400   17.5100 -119.4300      16.5        25       141        97
VIS    2025250     91400   17.7400 -109.9400       7.3        44       190       100
VIS    2025250     91400   17.7400 -109.9700       6.8        43       187        97
VIS    2025250     91400   17.7200 -110.2700      12.1        91       164        97
VIS    2025250     91400   17.7100 -110.2800      13.2        89       164        99
VIS    2025250     91400   17.7100 -110.3000      12.4        84       158        97
VIS    2025250     91400   17.7200 -110.3500      10.1        66       157       100
VIS    2025250     91400   17.7000 -110.4900      15.1        76       149        97
VIS    2025250     91400   17.7100 -110.5500      12.9        65       144        97
VIS    2025250     91400   17.7100 -110.5900      12.8        69       136       100
VIS    2025250     91400   17.7000 -110.6200      13.2        69       128       100
VIS    2025250     91400   17.7000 -110.6600      15.0        69       123       100
VIS    2025250     91400   17.7200 -110.6800      14.8        72       125       100
VIS    2025250     91400   17.7000 -110.7200      12.9        63       126       100
VIS    2025250     91400   17.7000 -110.7200      12.7        62       128       100
VIS    2025250     91400   17.6900 -110.7600      11.3        65       134        94
VIS    2025250     91400   17.7000 -110.8100       9.5        72       137       100
VIS    2025250     91400   17.6900 -110.8400       9.3        77       147        99
VIS    2025250     91400   17.7000 -110.8500       9.6        76       151        99
VIS    2025250     91400   17.7100 -110.8700       9.6        72       155       100
VIS    2025250     91400   17.7100 -110.9200       8.8        56       160        97
VIS    2025250     91400   17.7100 -110.9500       8.3        61       160        98
VIS    2025250     91400   17.6900 -110.9700       8.8        71       161        99
VIS    2025250     91400   17.6900 -111.1000       8.9        75       161        91
VIS    2025250     91400   17.6900 -111.1300       7.8        70       159       100
VIS    2025250     91400   17.7000 -111.1400       7.8        73       159        99
VIS    2025250     91400   17.6900 -111.2200      11.3        86       148        97
VIS    2025250     91400   17.6900 -111.2500       9.8        74       145        98
VIS    2025250     91400   17.6800 -111.2800      10.3        64       123        96
VIS    2025250     91400   17.6900 -111.3000      10.7        66       104       100
VIS    2025250     91400   17.7000 -111.3100      10.8        68       103        97
VIS    2025250     91400   17.6900 -111.3600      11.1        67       103        96
VIS    2025250     91400   17.6700 -111.5100       9.3        75       104        91
VIS    2025250     91400   17.6900 -111.5300       8.2        81       108        98
VIS    2025250     91400   17.6800 -111.5600       6.3        84       128        99
VIS    2025250     91400   17.6700 -111.5900       4.4        86       158       100
VIS    2025250     91400   17.6800 -111.6300       4.3        98       158        99
VIS    2025250     91400   17.6800 -111.8600      12.3        67       146        96
VIS    2025250     91400   17.6500 -112.3300       8.2        51       137       100
VIS    2025250     91400   17.6600 -112.3900       8.8        31       135        93
VIS    2025250     91400   17.6500 -112.4000       8.8        40       134        99
VIS    2025250     91400   17.6500 -112.4500      10.2        45       129        98
VIS    2025250     91400   17.6400 -112.4600      10.0        44       129        97
VIS    2025250     91400   17.6400 -112.5100       9.3        35       130        99
VIS    2025250     91400   17.6400 -112.5200       8.6        33       130       100
VIS    2025250     91400   17.6500 -112.5500       8.6        30       130       100
VIS    2025250     91400   17.6400 -112.5800       7.2        27       132        90
VIS    2025250     91400   17.6400 -112.6200       7.7        24       136        97
VIS    2025250     91400   17.6400 -112.6500       7.0        15       136        99
VIS    2025250     91400   17.6400 -112.7000       6.7        32       134        99
VIS    2025250     91400   17.6500 -112.7300       6.7        30       135        99
VIS    2025250     91400   17.6400 -112.7500       6.2        35       136        98
VIS    2025250     91400   17.6500 -112.8200       5.9        30       139        97
VIS    2025250     91400   17.6500 -112.8600       6.6        29       137       100
VIS    2025250     91400   17.6300 -112.8700       6.6        34       137        99
VIS    2025250     91400   17.6300 -112.9100       7.8        37       133        99
VIS    2025250     91400   17.6400 -112.9400       7.3        35       127        99
VIS    2025250     91400   17.6400 -113.0000       6.4        32       127        97
VIS    2025250     91400   17.6300 -113.0300       6.1        29       132        91
VIS    2025250     91400   17.6400 -113.0500       5.5        28       129        94
VIS    2025250     91400   17.6400 -113.0800       6.0        29       130        94
VIS    2025250     91400   17.6500 -113.1200       6.2        27       130        97
VIS    2025250     91400   17.6400 -113.1400       6.5        30       134        99
VIS    2025250     91400   17.6400 -113.1700       6.3        28       136        96
VIS    2025250     91400   17.6200 -113.2600       4.7         4       138        99
VIS    2025250     91400   17.6200 -113.2700       4.7         3       138       100
VIS    2025250     91400   17.6300 -113.3000       4.8        25       139        97
VIS    2025250     91400   17.6200 -113.3400       6.1        16       140        90
VIS    2025250     91400   17.6400 -113.3700       7.4        20       140       100
VIS    2025250     91400   17.6400 -113.4000       8.2        21       141       100
VIS    2025250     91400   17.6400 -113.4200       8.1        22       141       100
VIS    2025250     91400   17.6200 -113.4500       7.6        25       144       100
VIS    2025250     91400   17.6200 -113.4800       7.6        24       147       100
VIS    2025250     91400   17.6400 -113.4900       7.2        22       147       100
VIS    2025250     91400   17.6300 -113.5500       6.4        31       146       100
VIS    2025250     91400   17.6300 -113.5500       6.3        31       146       100
VIS    2025250     91400   17.6300 -113.6000       6.1        27       144       100
VIS    2025250     91400   17.6200 -113.6200       6.7        23       144       100
VIS    2025250     91400   17.6300 -113.6400       6.9        15       147        98
VIS    2025250     91400   17.6200 -113.6800       7.6         4       144       100
VIS    2025250     91400   17.6100 -113.7200       6.1        15       143       100
VIS    2025250     91400   17.6100 -113.7500       5.6        18       145        99
VIS    2025250     91400   17.6100 -113.7500       5.5        15       145        97
VIS    2025250     91400   17.6200 -113.8000       4.5       359       146        96
VIS    2025250     91400   17.6300 -113.8100       4.6       355       146        97
VIS    2025250     91400   17.6200 -113.8600       5.2         1       148       100
VIS    2025250     91400   17.6100 -113.8700       5.4         5       148       100
VIS    2025250     91400   17.6200 -113.9200       7.1        18       141       100
VIS    2025250     91400   17.6100 -113.9300       7.2        18       144       100
VIS    2025250     91400   17.6100 -113.9700       6.9        11       145       100
VIS    2025250     91400   17.6000 -113.9800       7.0         9       146       100
VIS    2025250     91400   17.6200 -114.0200       5.9       359       149        99
VIS    2025250     91400   17.6000 -114.0600       5.2       354       151       100
VIS    2025250     91400   17.6100 -114.0900       5.2       353       155       100
VIS    2025250     91400   17.6000 -114.1000       5.5       356       155        99
VIS    2025250     91400   17.6100 -114.1400       6.2       337       165        97
VIS    2025250     91400   17.6200 -114.1700       6.4       332       165       100
VIS    2025250     91400   17.6100 -114.2000       7.1       338       164        99
VIS    2025250     91400   17.6200 -114.2300       7.7       349       164        96
VIS    2025250     91400   17.6100 -114.2300       7.6       348       164        96
VIS    2025250     91400   17.6100 -114.2700       6.6       351       167        95
VIS    2025250     91400   17.6100 -114.3000       6.9       356       173        98
VIS    2025250     91400   17.6100 -114.3400       7.2       352       171        99
VIS    2025250     91400   17.6000 -114.3600       7.8       349       170       100
VIS    2025250     91400   17.6000 -114.4000       5.8       355       171        98
VIS    2025250     91400   17.6000 -114.4300       5.3       346       169        99
VIS    2025250     91400   17.6100 -114.4500       5.6       345       167       100
VIS    2025250     91400   17.6100 -114.4700       5.8       344       167        99
VIS    2025250     91400   17.6000 -114.5000       6.2       343       168        99
VIS    2025250     91400   17.5900 -114.6900       5.3       356       187        92
VIS    2025250     91400   17.5600 -115.9900       4.5        98       177        90
VIS    2025250     91400   17.5700 -116.0000       5.0        96       177        98
VIS    2025250     91400   17.5400 -116.3000       9.9        46       187       100
VIS    2025250     91400   17.5400 -116.3100      10.0        46       187       100
VIS    2025250     91400   17.5600 -116.3300      10.1        54       176        96
VIS    2025250     91400   17.5500 -116.3900       9.8         5       189        99
VIS    2025250     91400   17.4900 -118.2600       7.1         7       182        93
VIS    2025250     91400   17.5000 -118.3000       6.6         5       178        90
VIS    2025250     91400   17.5100 -118.3300       6.5         4       178        92
VIS    2025250     91400   17.4800 -119.3700      14.8        21       154       100
VIS    2025250     91400   17.4700 -119.4100      16.1        20       145       100
VIS    2025250     91400   17.4800 -119.4300      16.9        26       142        96
VIS    2025250     91400   17.4800 -119.4500      16.4        20       142        96
VIS    2025250     91400   17.7100 -109.9400       8.5        44       187        97
VIS    2025250     91400   17.7100 -109.9400       8.4        45       187        99
VIS    2025250     91400   17.7100 -109.9700       7.7        49       181        94
VIS    2025250     91400   17.7100 -110.0500      10.8        39       185        94
VIS    2025250     91400   17.7000 -110.0700      10.0        39       186        99
VIS    2025250     91400   17.7000 -110.2400      11.1        94       164        92
VIS    2025250     91400   17.7000 -110.2500      11.4        94       164        96
VIS    2025250     91400   17.7000 -110.3000      12.8        86       161        99
VIS    2025250     91400   17.7000 -110.3100      12.7        84       161        99
VIS    2025250     91400   17.7000 -110.3400      11.6        77       157        94
VIS    2025250     91400   17.6800 -110.3800      14.3        97       156        95
VIS    2025250     91400   17.6800 -110.4400      14.3        80       150        92
VIS    2025250     91400   17.6800 -110.4700      13.0        72       150        97
VIS    2025250     91400   17.6800 -110.5100      12.9        66       150        97
VIS    2025250     91400   17.6800 -110.5500      13.2        65       144        96
VIS    2025250     91400   17.6700 -110.6000      13.1        68       129       100
VIS    2025250     91400   17.6900 -110.6200      12.7        69       131       100
VIS    2025250     91400   17.6900 -110.6600      14.6        67       123       100
VIS    2025250     91400   17.6900 -110.6900      14.5        63       123       100
VIS    2025250     91400   17.6900 -110.7200      12.8        60       128       100
VIS    2025250     91400   17.6800 -110.7300      13.1        58       130       100
VIS    2025250     91400   17.6800 -110.7600      12.0        64       132        98
VIS    2025250     91400   17.6700 -110.8000       9.4        73       135        95
VIS    2025250     91400   17.6900 -110.8300       9.4        73       145       100
VIS    2025250     91400   17.6900 -110.8600       9.8        78       151        99
VIS    2025250     91400   17.6800 -110.8900      10.3        78       154        99
VIS    2025250     91400   17.6800 -110.9000      10.6        78       156       100
VIS    2025250     91400   17.6600 -110.9600       9.6        76       158       100
VIS    2025250     91400   17.6700 -110.9700       9.4        76       161       100
VIS    2025250     91400   17.6600 -111.0300       7.3        81       164        96
VIS    2025250     91400   17.6700 -111.1200       8.3        67       160        99
VIS    2025250     91400   17.6800 -111.1500       7.9        63       157        98
VIS    2025250     91400   17.6600 -111.2400      11.8        68       142        91
VIS    2025250     91400   17.6700 -111.2700      10.7        64       125        97
VIS    2025250     91400   17.6700 -111.3100      10.7        62       104       100
VIS    2025250     91400   17.6600 -111.3200      10.6        63       103       100
VIS    2025250     91400   17.6500 -111.4400       8.9        56       103        91
VIS    2025250     91400   17.6700 -111.5100       9.3        75       103        91
VIS    2025250     91400   17.6600 -111.5300       8.5        75       104       100
VIS    2025250     91400   17.6600 -111.5600       6.1        75       124        98
VIS    2025250     91400   17.6500 -111.6000       4.4        85       154       100
VIS    2025250     91400   17.6600 -111.6400       4.6       108       158        90
VIS    2025250     91400   17.6500 -111.6600       4.6       118       155        98
VIS    2025250     91400   17.6300 -112.2800      10.2        60       126        96
VIS    2025250     91400   17.6300 -112.4200       9.8        45       134        99
VIS    2025250     91400   17.6300 -112.4400       9.9        47       132        99
VIS    2025250     91400   17.6400 -112.5300       8.6        34       130        99
VIS    2025250     91400   17.6300 -112.5900       7.1        25       131        93
VIS    2025250     91400   17.6200 -112.6100       6.6        26       130        91
VIS    2025250     91400   17.6200 -112.6400       6.3        25       128        96
VIS    2025250     91400   17.6100 -112.6900       6.6        28       132        98
VIS    2025250     91400   17.6200 -112.7000       6.3        32       132        99
VIS    2025250     91400   17.6200 -112.7400       6.5        34       136        98
VIS    2025250     91400   17.6300 -112.7500       6.1        36       136        96
VIS    2025250     91400   17.6200 -112.7900       6.7        25       138        98
VIS    2025250     91400   17.6100 -112.8200       7.5        18       139        98
VIS    2025250     91400   17.6300 -112.8600       6.4        34       138        98
VIS    2025250     91400   17.6300 -112.8700       6.5        35       137        99
VIS    2025250     91400   17.6300 -112.9000       7.8        39       134        99
VIS    2025250     91400   17.6300 -112.9400       8.1        38       132       100
VIS    2025250     91400   17.6100 -112.9600       8.1        38       133        99
VIS    2025250     91400   17.6200 -112.9900       7.3        36       132        91
VIS    2025250     91400   17.6200 -113.0200       7.0        28       136        91
VIS    2025250     91400   17.6200 -113.0500       6.8        26       134        91
VIS    2025250     91400   17.6200 -113.1200       7.8        19       134       100
VIS    2025250     91400   17.6200 -113.1300       7.5        21       134       100
VIS    2025250     91400   17.6000 -113.1800       7.3        36       135        90
VIS    2025250     91400   17.6200 -113.2600       4.6         2       138        99
VIS    2025250     91400   17.6200 -113.2700       4.6       359       138       100
VIS    2025250     91400   17.5900 -113.3800       8.6        25       139        98
VIS    2025250     91400   17.6100 -113.3900       8.0        22       140        99
VIS    2025250     91400   17.6100 -113.4400       7.9        23       141        99
VIS    2025250     91400   17.6100 -113.4400       7.8        24       143       100
VIS    2025250     91400   17.6000 -113.4900       7.7        24       145       100
VIS    2025250     91400   17.6000 -113.5100       7.5        25       147       100
VIS    2025250     91400   17.6000 -113.5400       7.1        31       147        99
VIS    2025250     91400   17.5900 -113.5600       6.9        33       147        99
VIS    2025250     91400   17.6000 -113.5900       6.5        29       146       100
VIS    2025250     91400   17.6100 -113.6100       7.0        25       144       100
VIS    2025250     91400   17.5900 -113.6500       7.2        18       143       100
VIS    2025250     91400   17.6000 -113.6900       6.9         8       143       100
VIS    2025250     91400   17.6000 -113.7200       6.0        17       143       100
VIS    2025250     91400   17.6000 -113.7400       5.8        19       144       100
VIS    2025250     91400   17.6000 -113.7700       5.7        15       147        95
VIS    2025250     91400   17.5800 -113.8100       5.5        14       152        99
VIS    2025250     91400   17.6000 -113.8400       4.5         1       155        98
VIS    2025250     91400   17.6000 -113.8600       5.1       359       153       100
VIS    2025250     91400   17.5900 -113.8800       6.1         7       151       100
VIS    2025250     91400   17.6000 -113.9000       6.7        16       148       100
VIS    2025250     91400   17.5900 -113.9300       7.2        16       148       100
VIS    2025250     91400   17.6000 -113.9800       7.1         8       146       100
VIS    2025250     91400   17.5800 -113.9900       7.1         5       146       100
VIS    2025250     91400   17.5800 -114.0300       6.3         2       148        98
VIS    2025250     91400   17.5800 -114.0500       6.1       359       151        98
VIS    2025250     91400   17.5900 -114.0900       6.3       359       157        99
VIS    2025250     91400   17.5900 -114.1000       6.5       360       158        98
VIS    2025250     91400   17.5900 -114.1400       8.1       320       167        97
VIS    2025250     91400   17.5900 -114.2000       6.8       312       165        99
VIS    2025250     91400   17.5700 -114.2700       6.1       355       169        98
VIS    2025250     91400   17.5700 -114.2700       6.1       354       172        99
VIS    2025250     91400   17.5700 -114.3100       6.9       352       170       100
VIS    2025250     91400   17.5900 -114.3200       7.4       353       172        99
VIS    2025250     91400   17.5900 -114.3700       8.0       353       168       100
VIS    2025250     91400   17.5800 -114.4400       5.5       348       171        93
VIS    2025250     91400   17.5700 -114.4700       6.4       346       169        97
VIS    2025250     91400   17.5800 -114.4900       6.7       344       168       100
VIS    2025250     91400   17.5400 -116.3000       9.7        45       188        99
VIS    2025250     91400   17.5400 -116.3100      10.0        46       187       100
VIS    2025250     91400   17.4800 -118.2000       6.9       355       183        90
VIS    2025250     91400   17.4800 -118.3200       7.6         3       177        97
VIS    2025250     91400   17.4700 -118.3300       8.2         2       177        98
VIS    2025250     91400   17.4700 -118.3500       8.5         1       177        96
VIS    2025250     91400   17.4500 -119.3800      15.3        20       161        90
VIS    2025250     91400   17.4600 -119.4100      16.1        19       150        97
VIS    2025250     91400   17.4400 -119.4300      17.9        18       150       100
VIS    2025250     91400   17.6900 -109.9300       9.0        41       189        97
VIS    2025250     91400   17.6700 -109.9700       9.8        43       177        99
VIS    2025250     91400   17.6900 -109.9800       8.9        44       174        92
VIS    2025250     91400   17.6700 -110.2400      13.9        96       174        95
VIS    2025250     91400   17.6600 -110.2700      13.0        86       164        92
VIS    2025250     91400   17.6600 -110.3000      12.7        82       164        97
VIS    2025250     91400   17.6700 -110.4000      13.1        94       153        95
VIS    2025250     91400   17.6700 -110.4100      13.1        86       151        95
VIS    2025250     91400   17.6700 -110.4400      13.9        83       150        98
VIS    2025250     91400   17.6500 -110.4800      12.3        70       150        93
VIS    2025250     91400   17.6600 -110.5000      12.6        68       150        93
VIS    2025250     91400   17.6500 -110.5400      13.0        64       141       100
VIS    2025250     91400   17.6700 -110.5700      13.2        65       136        98
VIS    2025250     91400   17.6700 -110.6000      13.2        67       129       100
VIS    2025250     91400   17.6600 -110.6200      13.0        67       126       100
VIS    2025250     91400   17.6600 -110.6600      13.7        64       123       100
VIS    2025250     91400   17.6500 -110.6700      13.5        60       127       100
VIS    2025250     91400   17.6600 -110.7000      13.7        59       127       100
VIS    2025250     91400   17.6600 -110.7500      12.2        63       133        99
VIS    2025250     91400   17.6400 -110.7800      11.3        68       135       100
VIS    2025250     91400   17.6400 -110.8000       9.3        74       138       100
VIS    2025250     91400   17.6500 -110.8200       8.5        83       140        92
VIS    2025250     91400   17.6400 -110.8800      11.6        67       143        99
VIS    2025250     91400   17.6400 -110.8800      11.4        67       144        98
VIS    2025250     91400   17.6500 -110.9100      10.8        69       153        96
VIS    2025250     91400   17.6400 -110.9700      10.1        75       156       100
VIS    2025250     91400   17.6400 -110.9700      10.0        73       156        99
VIS    2025250     91400   17.6500 -111.0400       7.2        78       164        93
VIS    2025250     91400   17.6400 -111.0600       7.3        65       164        98
VIS    2025250     91400   17.6300 -111.1000       7.3        64       160        99
VIS    2025250     91400   17.6500 -111.1200       8.0        68       159        91
VIS    2025250     91400   17.6500 -111.2300      12.8        70       144        99
VIS    2025250     91400   17.6400 -111.2600      11.3        66       142       100
VIS    2025250     91400   17.6400 -111.2700      10.9        64       141       100
VIS    2025250     91400   17.6500 -111.3100       9.9        59       104        94
VIS    2025250     91400   17.6300 -111.4400       8.5        56       103        95
VIS    2025250     91400   17.6300 -111.5500       7.2        64       124        98
VIS    2025250     91400   17.6400 -111.5900       5.9        73       138       100
VIS    2025250     91400   17.6300 -112.0100      10.4        59       143        92
VIS    2025250     91400   17.6100 -112.4000       9.6        44       139        99
VIS    2025250     91400   17.6000 -112.4300       9.4        43       139       100
VIS    2025250     91400   17.6000 -112.4400       9.3        42       139       100
VIS    2025250     91400   17.6000 -112.4900       8.7        42       133        91
VIS    2025250     91400   17.6000 -112.5000       8.5        41       134        95
VIS    2025250     91400   17.5900 -112.5300       8.1        34       134       100
VIS    2025250     91400   17.6000 -112.6400       6.2        26       128        95
VIS    2025250     91400   17.6000 -112.6600       6.4        26       128        95
VIS    2025250     91400   17.5900 -112.7400       7.0        34       139        99
VIS    2025250     91400   17.6100 -112.7700       6.9        26       138        98
VIS    2025250     91400   17.6000 -112.7900       7.2        22       139        97
VIS    2025250     91400   17.6000 -112.8200       7.7        18       140        99
VIS    2025250     91400   17.6000 -112.8400       7.9        14       142        96
VIS    2025250     91400   17.5900 -112.9000       8.0        41       139        98
VIS    2025250     91400   17.5900 -112.9000       8.2        43       140        98
VIS    2025250     91400   17.6000 -112.9400       8.9        38       136        98
VIS    2025250     91400   17.6000 -112.9600       8.5        36       136       100
VIS    2025250     91400   17.6000 -112.9900       7.9        35       133        98
VIS    2025250     91400   17.5800 -113.1000       7.9         4       139        91
VIS    2025250     91400   17.5900 -113.1800       6.5        31       133        98
VIS    2025250     91400   17.5900 -113.2600       4.7        26       141        94
VIS    2025250     91400   17.5800 -113.3000       4.7       345       145        91
VIS    2025250     91400   17.5900 -113.3700       8.4        28       140        96
VIS    2025250     91400   17.5800 -113.4000       9.0        23       140        99
VIS    2025250     91400   17.5700 -113.4500       8.5        23       143       100
VIS    2025250     91400   17.5800 -113.4500       8.3        25       141        99
VIS    2025250     91400   17.5800 -113.5000       8.1        22       144       100
VIS    2025250     91400   17.5700 -113.5100       8.3        23       144       100
VIS    2025250     91400   17.5800 -113.5500       7.6        28       148        99
VIS    2025250     91400   17.5700 -113.5800       7.5        25       147        99
VIS    2025250     91400   17.5700 -113.5900       7.3        25       145        99
VIS    2025250     91400   17.5800 -113.6300       7.3        24       144       100
VIS    2025250     91400   17.5700 -113.6600       6.7        21       143       100
VIS    2025250     91400   17.5700 -113.7000       6.0        21       143       100
VIS    2025250     91400   17.5700 -113.7300       6.3        20       144       100
VIS    2025250     91400   17.5800 -113.7400       6.4        19       144       100
VIS    2025250     91400   17.5800 -113.7600       6.6        18       146       100
VIS    2025250     91400   17.5600 -113.8100       6.6        15       152       100
VIS    2025250     91400   17.5700 -113.8200       6.0        15       155       100
VIS    2025250     91400   17.5700 -113.8700       5.3         1       154       100
VIS    2025250     91400   17.5600 -113.8900       5.5         7       152        99
VIS    2025250     91400   17.5700 -113.9200       6.1        19       151        99
VIS    2025250     91400   17.5500 -113.9500       5.9        15       151        99
VIS    2025250     91400   17.5600 -113.9600       6.1         9       151        99
VIS    2025250     91400   17.5700 -114.0000       7.1         4       146       100
VIS    2025250     91400   17.5700 -114.0400       6.7         4       151        99
VIS    2025250     91400   17.5700 -114.0500       6.4         1       151        99
VIS    2025250     91400   17.5700 -114.0800       6.6       358       155        95
VIS    2025250     91400   17.5700 -114.1200       8.5         3       161        99
VIS    2025250     91400   17.5600 -114.1300       8.8         5       163        97
VIS    2025250     91400   17.5600 -114.1800       6.9       344       165        95
VIS    2025250     91400   17.5600 -114.2000       6.9       351       165        99
VIS    2025250     91400   17.5500 -114.2400       5.9         2       167        99
VIS    2025250     91400   17.5600 -114.2700       6.1       355       169        99
VIS    2025250     91400   17.5600 -114.2800       6.2       353       169        99
VIS    2025250     91400   17.5600 -114.3100       6.7       352       169       100
VIS    2025250     91400   17.5400 -114.3600       6.9       352       166       100
VIS    2025250     91400   17.5400 -114.3600       6.9       353       166        99
VIS    2025250     91400   17.5500 -114.3900       6.3         5       169       100
VIS    2025250     91400   17.5500 -114.4200       5.7         1       172       100
VIS    2025250     91400   17.5500 -114.4500       6.0       348       173        96
VIS    2025250     91400   17.5400 -114.4900       6.5       350       172        94
VIS    2025250     91400   17.5500 -114.5100       6.4       352       170        95
VIS    2025250     91400   17.5000 -115.8800       7.7        57       176        96
VIS    2025250     91400   17.5100 -115.9400      12.2        50       185        99
VIS    2025250     91400   17.4500 -118.1500       4.5       349       183        99
VIS    2025250     91400   17.4500 -118.1900       5.5       355       183       100
VIS    2025250     91400   17.4500 -118.2200       6.5         4       181        96
VIS    2025250     91400   17.4400 -118.3200       8.9       357       177       100
VIS    2025250     91400   17.4600 -118.3500       8.6       359       177        97
VIS    2025250     91400   17.4500 -118.3500       9.0       358       177        98
VIS    2025250     91400   17.4300 -119.4200      18.4        17       150       100
VIS    2025250     91400   17.6500 -109.9500       9.8        42       188        99
VIS    2025250     91400   17.6600 -109.9600       9.9        43       181        99
VIS    2025250     91400   17.6600 -109.9900      10.5        37       177        97
VIS    2025250     91400   17.6400 -110.2700      12.6        91       164        98
VIS    2025250     91400   17.6400 -110.3000      12.4        83       165        99
VIS    2025250     91400   17.6400 -110.3200      12.1        78       165        99
VIS    2025250     91400   17.6500 -110.3600      12.9        70       163        95
VIS    2025250     91400   17.6400 -110.3900      13.1        73       156        97
VIS    2025250     91400   17.6400 -110.4300      12.1        80       151        95
VIS    2025250     91400   17.6500 -110.4400      12.6        83       150        97
VIS    2025250     91400   17.6400 -110.4800      11.4        79       149        99
VIS    2025250     91400   17.6300 -110.5200      13.2        64       140        99
VIS    2025250     91400   17.6300 -110.5500      13.0        62       137       100
VIS    2025250     91400   17.6400 -110.5600      13.0        62       137       100
VIS    2025250     91400   17.6400 -110.6000      13.3        63       127        99
VIS    2025250     91400   17.6400 -110.6400      13.3        63       124       100
VIS    2025250     91400   17.6400 -110.6700      13.4        60       127       100
VIS    2025250     91400   17.6400 -110.6800      13.5        59       127       100
VIS    2025250     91400   17.6400 -110.7200      12.9        57       135        99
VIS    2025250     91400   17.6400 -110.7400      12.6        60       135        99
VIS    2025250     91400   17.6200 -110.7800      11.4        69       135        99
VIS    2025250     91400   17.6400 -110.7900      10.2        72       137       100
VIS    2025250     91400   17.6400 -110.8200       8.4        84       140        92
VIS    2025250     91400   17.6400 -110.8600      11.7        69       143       100
VIS    2025250     91400   17.6200 -110.9100      10.3        63       151       100
VIS    2025250     91400   17.6200 -110.9200      10.0        66       153       100
VIS    2025250     91400   17.6300 -110.9700      10.1        72       156        98
VIS    2025250     91400   17.6300 -110.9700      10.1        72       155        98
VIS    2025250     91400   17.6200 -111.0300       6.6        60       163        97
VIS    2025250     91400   17.6200 -111.0500       6.6        57       164       100
VIS    2025250     91400   17.6200 -111.0900       7.2        63       164        92
VIS    2025250     91400   17.6200 -111.0900       7.2        65       164        94
VIS    2025250     91400   17.6100 -111.1300       7.3        73       160        96
VIS    2025250     91400   17.6100 -111.1700       8.6        91       154        98
VIS    2025250     91400   17.6200 -111.2600      11.6        66       148       100
VIS    2025250     91400   17.6000 -111.5100      10.3        54       148        99
VIS    2025250     91400   17.6000 -111.5400      10.5        54       147       100
VIS    2025250     91400   17.6000 -111.5800       9.0        56       147       100
VIS    2025250     91400   17.5900 -111.6000       8.4        53       155        99
VIS    2025250     91400   17.6000 -111.6700       4.7        34       154        90
VIS    2025250     91400   17.5900 -111.9000      14.4        45       148        99
VIS    2025250     91400   17.5900 -112.4200       9.7        39       139       100
VIS    2025250     91400   17.5800 -112.4600       9.1        43       139       100
VIS    2025250     91400   17.5700 -112.4900       8.8        41       134       100
VIS    2025250     91400   17.5800 -112.5300       8.2        33       134        99
VIS    2025250     91400   17.5900 -112.5300       8.1        33       134       100
VIS    2025250     91400   17.5900 -112.5600       9.0        32       134        97
VIS    2025250     91400   17.5700 -112.6000       8.6        46       133        98
VIS    2025250     91400   17.5800 -112.7400       7.8        35       140        99
VIS    2025250     91400   17.5800 -112.7700       8.3        24       142        99
VIS    2025250     91400   17.5800 -112.7900       8.5        17       142        95
VIS    2025250     91400   17.5800 -112.9100       8.0        46       143        90
VIS    2025250     91400   17.5600 -112.9600       7.7        21       144        98
VIS    2025250     91400   17.5800 -112.9700       7.8        26       142        99
VIS    2025250     91400   17.5600 -113.0700       7.8         7       142        94
VIS    2025250     91400   17.5700 -113.1000       6.7         6       142       100
VIS    2025250     91400   17.5600 -113.1300       6.6         9       140        97
VIS    2025250     91400   17.5500 -113.1600       7.3        17       139        93
VIS    2025250     91400   17.5500 -113.1900       9.0        20       139        91
VIS    2025250     91400   17.5700 -113.2100       7.6         9       136        95
VIS    2025250     91400   17.5600 -113.2600      12.6         5       143        99
VIS    2025250     91400   17.5600 -113.3000       7.7         1       145        99
VIS    2025250     91400   17.5700 -113.3100       6.8       358       145        91
VIS    2025250     91400   17.5600 -113.4100       9.2        23       141        96
VIS    2025250     91400   17.5600 -113.4500       8.5        23       143       100
VIS    2025250     91400   17.5600 -113.4600       8.3        24       144       100
VIS    2025250     91400   17.5400 -113.5000       8.7        24       143       100
VIS    2025250     91400   17.5600 -113.5200       8.6        22       144       100
VIS    2025250     91400   17.5500 -113.5500       8.5        22       147       100
VIS    2025250     91400   17.5500 -113.5900       8.0        23       144       100
VIS    2025250     91400   17.5400 -113.6000       7.9        24       142       100
VIS    2025250     91400   17.5400 -113.6300       7.4        22       141       100
VIS    2025250     91400   17.5500 -113.6700       6.5        22       143        99
VIS    2025250     91400   17.5400 -113.6900       6.2        25       144        96
VIS    2025250     91400   17.5500 -113.7100       6.1        23       144        99
VIS    2025250     91400   17.5500 -113.7600       7.3        18       146       100
VIS    2025250     91400   17.5400 -113.7700       7.5        18       146       100
VIS    2025250     91400   17.5500 -113.8100       6.9        16       152       100
VIS    2025250     91400   17.5400 -113.8400       6.6         9       155       100
VIS    2025250     91400   17.5400 -113.8700       6.1         6       154        99
VIS    2025250     91400   17.5400 -113.9000       5.1        21       153       100
VIS    2025250     91400   17.5500 -113.9200       5.6        23       153        99
VIS    2025250     91400   17.5500 -113.9600       5.9        14       153        99
VIS    2025250     91400   17.5300 -113.9900       6.5        13       154        99
VIS    2025250     91400   17.5300 -114.0000       6.8        13       157        99
VIS    2025250     91400   17.5500 -114.0300       7.4        10       155        99
VIS    2025250     91400   17.5300 -114.0700       7.9         3       161       100
VIS    2025250     91400   17.5300 -114.1000       8.2         5       165       100
VIS    2025250     91400   17.5200 -114.1200       8.6         5       165        99
VIS    2025250     91400   17.5400 -114.1500       9.4         5       166        96
VIS    2025250     91400   17.5400 -114.2200       7.3         5       165        99
VIS    2025250     91400   17.5300 -114.2700       6.1       355       166        98
VIS    2025250     91400   17.5300 -114.2800       6.2       351       167        99
VIS    2025250     91400   17.5200 -114.3100       6.4       352       167       100
VIS    2025250     91400   17.5400 -114.3600       6.8       352       166        99
VIS    2025250     91400   17.5200 -114.3900       5.8         8       172        99
VIS    2025250     91400   17.5200 -114.3900       5.9         5       172        98
VIS    2025250     91400   17.5200 -114.4400       6.9       355       173        99
VIS    2025250     91400   17.5200 -114.4500       7.1       354       173        99
VIS    2025250     91400   17.5300 -114.4800       7.1       350       172        99
VIS    2025250     91400   17.5200 -114.6400       6.5        21       182        94
VIS    2025250     91400   17.5300 -114.6500       7.0        21       182        98
VIS    2025250     91400   17.5000 -115.9600      12.0        50       185       100
VIS    2025250     91400   17.4900 -116.0800       4.5         3       189        91
VIS    2025250     91400   17.4900 -116.0900       4.6        18       189        97
VIS    2025250     91400   17.4300 -118.1500       4.1       357       184        99
VIS    2025250     91400   17.4400 -118.1900       5.4       356       182       100
VIS    2025250     91400   17.4400 -118.2200       6.2         2       180        97
VIS    2025250     91400   17.4400 -118.2200       6.4         5       180        94
VIS    2025250     91400   17.4200 -118.3100      17.8         2       175        99
VIS    2025250     91400   17.4400 -118.3500       9.2       357       177        99
VIS    2025250     91400   17.3900 -119.4200      15.0        11       158        95
VIS    2025250     91400   17.4000 -119.4400      17.9        17       157        96
VIS    2025250     91400   17.4000 -119.4600      17.5        15       158        96
VIS    2025250     91400   17.6300 -109.9400       9.8        46       188       100
VIS    2025250     91400   17.6200 -109.9900      11.6        33       183        99
VIS    2025250     91400   17.6300 -110.0000      11.6        32       180        97
VIS    2025250     91400   17.6200 -110.0300      10.0        26       180        97
VIS    2025250     91400   17.6200 -110.0600       9.3        27       179        99
VIS    2025250     91400   17.6200 -110.0800      10.4        28       179       100
VIS    2025250     91400   17.6200 -110.2900      12.1        83       164       100
VIS    2025250     91400   17.6300 -110.3000      12.2        81       165        99
VIS    2025250     91400   17.6100 -110.3300      11.7        61       165        95
VIS    2025250     91400   17.6100 -110.3800      12.9        72       156       100
VIS    2025250     91400   17.6300 -110.4000      13.0        71       156        99
VIS    2025250     91400   17.6200 -110.4200      12.7        70       152        99
VIS    2025250     91400   17.6000 -110.4600      12.6        70       142       100
VIS    2025250     91400   17.6100 -110.4800      12.0        73       141       100
VIS    2025250     91400   17.6000 -110.5300      13.5        64       138       100
VIS    2025250     91400   17.6100 -110.5500      13.1        63       137       100
VIS    2025250     91400   17.6200 -110.5900      13.4        62       133        98
VIS    2025250     91400   17.6000 -110.6100      13.8        61       133        99
VIS    2025250     91400   17.6100 -110.6200      13.8        61       128        98
VIS    2025250     91400   17.6000 -110.6800      13.6        55       135        99
VIS    2025250     91400   17.6100 -110.6800      13.5        55       134        99
VIS    2025250     91400   17.6000 -110.7200      14.0        52       136        99
VIS    2025250     91400   17.6000 -110.7700      12.9        60       135       100
VIS    2025250     91400   17.6000 -110.7700      12.6        62       135       100
VIS    2025250     91400   17.6100 -110.8200       5.9        86       139        99
VIS    2025250     91400   17.6100 -110.8700      12.1        61       142        96
VIS    2025250     91400   17.5900 -110.9500       9.2        65       158       100
VIS    2025250     91400   17.5900 -110.9700       9.5        65       157       100
VIS    2025250     91400   17.6100 -111.0000       9.4        66       157        92
VIS    2025250     91400   17.5900 -111.0300       8.2        66       161        99
VIS    2025250     91400   17.6000 -111.0600       6.8        65       165        99
VIS    2025250     91400   17.5900 -111.0800       6.8        72       166        99
VIS    2025250     91400   17.5900 -111.1200       7.2        80       162        99
VIS    2025250     91400   17.6000 -111.1300       7.3        78       160        92
VIS    2025250     91400   17.5900 -111.1800       9.0        99       154        99
VIS    2025250     91400   17.5900 -111.2100       8.9        85       158        99
VIS    2025250     91400   17.6000 -111.2200       8.9        83       158        97
VIS    2025250     91400   17.5800 -111.2700      10.7        63       157        99
VIS    2025250     91400   17.5800 -111.2900      10.5        64       154        98
VIS    2025250     91400   17.5800 -111.3300       8.4        61       141        99
VIS    2025250     91400   17.5800 -111.3500       7.7        60       141        95
VIS    2025250     91400   17.5800 -111.3800       8.8        64       131        99
VIS    2025250     91400   17.5900 -111.4800       9.1        59       126        90
VIS    2025250     91400   17.5900 -111.5000      10.4        54       148        99
VIS    2025250     91400   17.5900 -111.5200      11.5        51       153        95
VIS    2025250     91400   17.5700 -111.5700       8.3        52       148       100
VIS    2025250     91400   17.5800 -111.5700       8.5        53       148       100
VIS    2025250     91400   17.5800 -111.6000       8.5        52       155       100
VIS    2025250     91400   17.5800 -111.9100      13.3        46       148        97
VIS    2025250     91400   17.5700 -111.9400      13.0        48       148        94
VIS    2025250     91400   17.5600 -112.2100       7.2        46       141        96
VIS    2025250     91400   17.5700 -112.2100       7.7        26       140        99
VIS    2025250     91400   17.5500 -112.2700       9.7        49       133        92
VIS    2025250     91400   17.5500 -112.2800       9.6        49       133        96
VIS    2025250     91400   17.5500 -112.3600      10.2        33       139        99
VIS    2025250     91400   17.5600 -112.4200       8.8        32       137        96
VIS    2025250     91400   17.5700 -112.4600       8.4        35       134       100
VIS    2025250     91400   17.5600 -112.4800       8.6        36       134       100
VIS    2025250     91400   17.5600 -112.5300       8.4        29       135        97
VIS    2025250     91400   17.5600 -112.5400       8.2        28       135        96
VIS    2025250     91400   17.5500 -112.5700       8.4        35       135        97
VIS    2025250     91400   17.5600 -112.6000       8.7        46       133        98
VIS    2025250     91400   17.5600 -112.6200       8.7        42       132        92
VIS    2025250     91400   17.5400 -112.6800       9.5        27       133        97
VIS    2025250     91400   17.5400 -112.7000       9.4        28       134        95
VIS    2025250     91400   17.5600 -112.7100       8.7        36       134        91
VIS    2025250     91400   17.5600 -112.7400       8.4        35       140       100
VIS    2025250     91400   17.5600 -112.7800       8.0        26       145        90
VIS    2025250     91400   17.5500 -112.8200      11.6         1       145        96
VIS    2025250     91400   17.5400 -112.8400      13.6       356       143        92
VIS    2025250     91400   17.5400 -112.9600       7.1        25       144       100
VIS    2025250     91400   17.5500 -112.9700       7.6        22       144        99
VIS    2025250     91400   17.5500 -113.0500       8.5        23       143       100
VIS    2025250     91400   17.5400 -113.0700       8.4        25       143        97
VIS    2025250     91400   17.5300 -113.1000       6.1        21       142        98
VIS    2025250     91400   17.5500 -113.1400       6.7        15       141        99
VIS    2025250     91400   17.5500 -113.1600       7.4        20       140        94
VIS    2025250     91400   17.5400 -113.1900       8.9        22       139        92
VIS    2025250     91400   17.5400 -113.2700      12.1        18       143        99
VIS    2025250     91400   17.5300 -113.3100      10.4        20       137        99
VIS    2025250     91400   17.5400 -113.3200       9.6        16       138        99
VIS    2025250     91400   17.5300 -113.3500       9.1        23       139        94
VIS    2025250     91400   17.5300 -113.4200       9.5        21       143        90
VIS    2025250     91400   17.5300 -113.4300       9.2        21       143        96
VIS    2025250     91400   17.5400 -113.4700       8.4        23       144       100
VIS    2025250     91400   17.5300 -113.5000       8.8        23       143       100
VIS    2025250     91400   17.5100 -113.5300       9.4        20       143       100
VIS    2025250     91400   17.5300 -113.5500       9.0        21       144       100
VIS    2025250     91400   17.5100 -113.5900       8.5        23       142        99
VIS    2025250     91400   17.5200 -113.6200       7.6        22       141        99
VIS    2025250     91400   17.5100 -113.6500       7.3        19       141       100
VIS    2025250     91400   17.5200 -113.6700       6.8        20       143        99
VIS    2025250     91400   17.5200 -113.6900       6.6        25       144        96
VIS    2025250     91400   17.5200 -113.7400       7.2        18       144       100
VIS    2025250     91400   17.5200 -113.7400       7.5        16       144       100
VIS    2025250     91400   17.5100 -113.7700       7.7        17       148        99
VIS    2025250     91400   17.5300 -113.8000       7.6        19       149        98
VIS    2025250     91400   17.5100 -113.8500       8.1         7       153        98
VIS    2025250     91400   17.5300 -113.8600       7.4         7       155       100
VIS    2025250     91400   17.5200 -113.9000       5.5        22       154        99
VIS    2025250     91400   17.5000 -113.9300       7.0        27       154        94
VIS    2025250     91400   17.5000 -113.9700       6.0         4       155        99
VIS    2025250     91400   17.5000 -113.9900       6.4         6       160        99
VIS    2025250     91400   17.5200 -114.0100       7.0        12       159        99
VIS    2025250     91400   17.5200 -114.0300       7.3        10       160        99
VIS    2025250     91400   17.5200 -114.0800       7.8         2       161       100
VIS    2025250     91400   17.5000 -114.1000       8.4       360       166       100
VIS    2025250     91400   17.5200 -114.1300       8.8         3       166        99
VIS    2025250     91400   17.5000 -114.1600       8.5         4       166        97
VIS    2025250     91400   17.5100 -114.1900       7.6         6       165        99
VIS    2025250     91400   17.5200 -114.2100       7.8         8       164       100
VIS    2025250     91400   17.5000 -114.2500       7.5       358       161        98
VIS    2025250     91400   17.4900 -114.2800       5.8       351       165        99
VIS    2025250     91400   17.5000 -114.3100       5.7       357       167        92
VIS    2025250     91400   17.5100 -114.3100       6.4       354       167       100
VIS    2025250     91400   17.5100 -114.3600       5.8       359       171        97
VIS    2025250     91400   17.5100 -114.3800       5.8        10       172       100
VIS    2025250     91400   17.5100 -114.3900       5.9         6       173        99
VIS    2025250     91400   17.4900 -114.4300       6.3       354       172        93
VIS    2025250     91400   17.5000 -114.4600       7.6       353       172        99
VIS    2025250     91400   17.4900 -114.5000       6.6       352       172        97
VIS    2025250     91400   17.5000 -114.6500       7.0        10       182        97
VIS    2025250     91400   17.4500 -115.8500       6.7        68       175        98
VIS    2025250     91400   17.4500 -115.8500       6.8        69       173        99
VIS    2025250     91400   17.4500 -115.8800       8.1        68       172        97
VIS    2025250     91400   17.4500 -116.2500      12.9       347       183        95
VIS    2025250     91400   17.4100 -118.1700       4.1         4       184        96
VIS    2025250     91400   17.4200 -118.1800       4.8       359       183        99
VIS    2025250     91400   17.4100 -118.2000       5.6       360       183       100
VIS    2025250     91400   17.3900 -118.3100      16.6         1       176        92
VIS    2025250     91400   17.3800 -119.4100      14.5         9       163        98
VIS    2025250     91400   17.3700 -119.4300      14.8        11       162        97
VIS    2025250     91400   17.6100 -109.9900      11.2        34       183        99
VIS    2025250     91400   17.6100 -110.0100      12.2        30       179        98
VIS    2025250     91400   17.5900 -110.0600       7.6        31       178        97
VIS    2025250     91400   17.5900 -110.0600       7.7        30       179        98
VIS    2025250     91400   17.6100 -110.0900       9.9        28       179        99
VIS    2025250     91400   17.5900 -110.3500      13.4        71       162       100
VIS    2025250     91400   17.5800 -110.3900      13.3        70       157       100
VIS    2025250     91400   17.5800 -110.3900      13.2        70       155       100
VIS    2025250     91400   17.5900 -110.4200      12.9        70       150       100
VIS    2025250     91400   17.6000 -110.4700      12.7        69       141       100
VIS    2025250     91400   17.5800 -110.5100      13.2        66       140       100
VIS    2025250     91400   17.5900 -110.5300      13.4        63       139       100
VIS    2025250     91400   17.6000 -110.5600      13.3        62       137       100
VIS    2025250     91400   17.5900 -110.5900      13.3        63       137       100
VIS    2025250     91400   17.5900 -110.6100      13.7        63       136       100
VIS    2025250     91400   17.5800 -110.6400      13.5        62       139        98
VIS    2025250     91400   17.5900 -110.6700      13.7        58       137        97
VIS    2025250     91400   17.5700 -110.6900      13.3        59       139        96
VIS    2025250     91400   17.5900 -110.7200      14.2        53       136       100
VIS    2025250     91400   17.5800 -110.7700      13.1        61       135       100
VIS    2025250     91400   17.5700 -110.7800      13.1        61       139       100
VIS    2025250     91400   17.5700 -110.9400       9.3        66       158        98
VIS    2025250     91400   17.5600 -110.9800       9.3        69       158        99
VIS    2025250     91400   17.5700 -110.9900       9.4        68       158       100
VIS    2025250     91400   17.5800 -111.0300       8.8        68       161       100
VIS    2025250     91400   17.5700 -111.0600       7.9        73       166        91
VIS    2025250     91400   17.5700 -111.1100       7.1        81       164        91
VIS    2025250     91400   17.5600 -111.1400       7.6        92       161       100
VIS    2025250     91400   17.5600 -111.1800       7.4       100       159       100
VIS    2025250     91400   17.5600 -111.2400      10.6        63       160        97
VIS    2025250     91400   17.5600 -111.2700      10.4        62       160       100
VIS    2025250     91400   17.5700 -111.2900      10.5        66       157        98
VIS    2025250     91400   17.5500 -111.3300       8.8        66       154        99
VIS    2025250     91400   17.5700 -111.3500       7.5        60       147        97
VIS    2025250     91400   17.5600 -111.4000       8.5        65       138        97
VIS    2025250     91400   17.5600 -111.4500      12.4        63       131        92
VIS    2025250     91400   17.5600 -111.4800      12.0        57       144        99
VIS    2025250     91400   17.5700 -111.4900      11.8        56       148       100
VIS    2025250     91400   17.5600 -111.5400       9.5        50       152        94
VIS    2025250     91400   17.5500 -111.5700       8.1        51       152        97
VIS    2025250     91400   17.5700 -111.5800       8.1        52       148       100
VIS    2025250     91400   17.5600 -111.6100       8.1        52       157        99
VIS    2025250     91400   17.5600 -111.6300       7.1        54       159        96
VIS    2025250     91400   17.5600 -111.6700       6.6        57       160        98
VIS    2025250     91400   17.5400 -111.8500       9.2        14       148        98
VIS    2025250     91400   17.5400 -112.2300       8.3        37       140        90
VIS    2025250     91400   17.5500 -112.2800       9.1        51       133       100
VIS    2025250     91400   17.5400 -112.3200       9.7        42       138        99
VIS    2025250     91400   17.5400 -112.3500      10.7        37       138       100
VIS    2025250     91400   17.5400 -112.3800      10.1        35       137        98
VIS    2025250     91400   17.5400 -112.4400       8.6        31       136        98
VIS    2025250     91400   17.5300 -112.4700       8.3        27       134       100
VIS    2025250     91400   17.5400 -112.4800       8.2        28       134        99
VIS    2025250     91400   17.5300 -112.5200       7.6        26       135       100
VIS    2025250     91400   17.5300 -112.6000       9.9        42       134        97
VIS    2025250     91400   17.5100 -112.6500      10.3        35       137        99
VIS    2025250     91400   17.5200 -112.6600       9.8        35       137       100
VIS    2025250     91400   17.5200 -112.7100      10.2        30       138        98
VIS    2025250     91400   17.5100 -112.7200      10.6        27       138        98
VIS    2025250     91400   17.5300 -112.7400       8.7        36       141        92
VIS    2025250     91400   17.5100 -112.9800      11.0        55       143        91
VIS    2025250     91400   17.5100 -113.0200      10.5        43       145       100
VIS    2025250     91400   17.5200 -113.0500      10.9        39       144        97
VIS    2025250     91400   17.5200 -113.1500       7.5        23       143        98
VIS    2025250     91400   17.5200 -113.1900       9.3        30       145        98
VIS    2025250     91400   17.5000 -113.2100       9.6        35       146       100
VIS    2025250     91400   17.5000 -113.2400      10.1        33       145        99
VIS    2025250     91400   17.5000 -113.2800      11.7        31       142        99
VIS    2025250     91400   17.5000 -113.3200      10.0        33       140        90
VIS    2025250     91400   17.5000 -113.3400       9.7        33       138        98
VIS    2025250     91400   17.5200 -113.3500       9.3        29       137        98
VIS    2025250     91400   17.5100 -113.3800       9.4        31       139        99
VIS    2025250     91400   17.5000 -113.4100       9.1        25       142        98
VIS    2025250     91400   17.4900 -113.4400       9.4        22       147        99
VIS    2025250     91400   17.5100 -113.4900       9.1        19       147        99
VIS    2025250     91400   17.4900 -113.5200       9.3        18       144       100
VIS    2025250     91400   17.5100 -113.5300       9.5        19       143       100
VIS    2025250     91400   17.4900 -113.5700       8.8        21       142        99
VIS    2025250     91400   17.5000 -113.5800       8.5        23       142        98
VIS    2025250     91400   17.5000 -113.6100       7.8        26       140        99
VIS    2025250     91400   17.4900 -113.6500       7.2        18       141        98
VIS    2025250     91400   17.5100 -113.6600       7.2        18       142       100
VIS    2025250     91400   17.5000 -113.7300       7.8        14       146       100
VIS    2025250     91400   17.4900 -113.7500       8.7        13       146       100
VIS    2025250     91400   17.5000 -113.7800       8.1        16       148        99
VIS    2025250     91400   17.5000 -113.8200       8.0        14       152        98
VIS    2025250     91400   17.5000 -113.8500       8.2         6       153        99
VIS    2025250     91400   17.4900 -113.8800       7.6         9       152        99
VIS    2025250     91400   17.4900 -113.9100       7.1        22       153        92
VIS    2025250     91400   17.5000 -113.9200       7.4        22       153        92
VIS    2025250     91400   17.4900 -113.9700       6.0       359       159        90
VIS    2025250     91400   17.5000 -114.0100       7.1         5       164       100
VIS    2025250     91400   17.4900 -114.0500       7.1       356       168       100
VIS    2025250     91400   17.4800 -114.1100      10.4       346       167        98
VIS    2025250     91400   17.4900 -114.1500       8.5         3       166        91
VIS    2025250     91400   17.4800 -114.1800       7.6       359       166        96
VIS    2025250     91400   17.4800 -114.2200       7.5       357       160        99
VIS    2025250     91400   17.4900 -114.2500       7.3       355       160       100
VIS    2025250     91400   17.4800 -114.2800       5.8       351       163        99
VIS    2025250     91400   17.4700 -114.2900       6.2       353       165        98
VIS    2025250     91400   17.4700 -114.3300       6.8         5       168        95
VIS    2025250     91400   17.4700 -114.3500       6.0         8       172        93
VIS    2025250     91400   17.4700 -114.3700       5.7        11       173        99
VIS    2025250     91400   17.4700 -114.4300       5.7       356       173        96
VIS    2025250     91400   17.4900 -114.4300       6.1       353       172        93
VIS    2025250     91400   17.4700 -114.4800       4.9       344       177       100
VIS    2025250     91400   17.4800 -114.5800       6.1       351       179        95
VIS    2025250     91400   17.4700 -114.6500       6.3         1       182        96
VIS    2025250     91400   17.4800 -114.6500       6.5         2       182        98
VIS    2025250     91400   17.4400 -115.8400       6.4        71       175        91
VIS    2025250     91400   17.4500 -115.8500       6.8        70       175       100
VIS    2025250     91400   17.4300 -116.2600      12.5       352       183        99
VIS    2025250     91400   17.4000 -116.9200       6.8        22       181       100
VIS    2025250     91400   17.3600 -119.4400      15.0        11       163        97
VIS    2025250     91400   17.5700 -109.8900       9.6        40       189       100
VIS    2025250     91400   17.5800 -109.9200      10.1        45       189       100
VIS    2025250     91400   17.5700 -110.0200       9.2        52       175        99
VIS    2025250     91400   17.5900 -110.0600       7.5        32       175        99
VIS    2025250     91400   17.5900 -110.0600       7.5        30       175        99
VIS    2025250     91400   17.5800 -110.3200      11.5        58       161       100
VIS    2025250     91400   17.5700 -110.3500      13.6        66       158       100
VIS    2025250     91400   17.5800 -110.3900      13.3        69       156       100
VIS    2025250     91400   17.5800 -110.3900      13.2        70       155       100
VIS    2025250     91400   17.5600 -110.4500      13.3        68       146       100
VIS    2025250     91400   17.5500 -110.4800      13.6        66       141       100
VIS    2025250     91400   17.5500 -110.4900      13.7        66       140        99
VIS    2025250     91400   17.5500 -110.5400      13.0        61       138        98
VIS    2025250     91400   17.5600 -110.5600      12.8        60       138        98
VIS    2025250     91400   17.5600 -110.5900      12.8        62       138        98
VIS    2025250     91400   17.5500 -110.6300      12.4        64       141        98
VIS    2025250     91400   17.5600 -110.6500      13.2        62       141        99
VIS    2025250     91400   17.5700 -110.6900      13.6        59       139        98
VIS    2025250     91400   17.5600 -110.7000      13.7        59       140        99
VIS    2025250     91400   17.5600 -110.7800      12.8        62       141        98
VIS    2025250     91400   17.5600 -110.8000      12.0        60       139        97
VIS    2025250     91400   17.5600 -110.8200      11.6        58       139        92
VIS    2025250     91400   17.5600 -110.9300       8.7        65       158        96
VIS    2025250     91400   17.5600 -110.9800       9.1        70       158        98
VIS    2025250     91400   17.5600 -111.0000       9.2        71       158        99
VIS    2025250     91400   17.5600 -111.0200       9.1        72       160        99
VIS    2025250     91400   17.5400 -111.0700       8.7        66       166        92
VIS    2025250     91400   17.5500 -111.1500       7.8        95       161        90
VIS    2025250     91400   17.5400 -111.2100       9.6        57       154        97
VIS    2025250     91400   17.5500 -111.2400      10.7        63       160        96
VIS    2025250     91400   17.5400 -111.2600      10.8        64       159        98
VIS    2025250     91400   17.5400 -111.3000      10.4        66       157       100
VIS    2025250     91400   17.5300 -111.3200       9.7        63       154       100
VIS    2025250     91400   17.5500 -111.3700       6.4        52       152       100
VIS    2025250     91400   17.5400 -111.3800       6.0        47       151       100
VIS    2025250     91400   17.5400 -111.4300      10.5        71       139        92
VIS    2025250     91400   17.5400 -111.4800      12.1        57       143       100
VIS    2025250     91400   17.5200 -111.5200      10.5        48       144        95
VIS    2025250     91400   17.5300 -111.5300      11.1        51       148        97
VIS    2025250     91400   17.5400 -111.5600       8.7        51       152        95
VIS    2025250     91400   17.5400 -111.5900       7.8        56       153        99
VIS    2025250     91400   17.5400 -111.6300       7.7        56       160        99
VIS    2025250     91400   17.5200 -111.6500       7.4        55       160       100
VIS    2025250     91400   17.5400 -111.6900       7.9        58       160       100
VIS    2025250     91400   17.5200 -111.7000       8.9        57       155        99
VIS    2025250     91400   17.5200 -111.7400       9.7        52       155        95
VIS    2025250     91400   17.5200 -111.7700      10.1        51       155        91
VIS    2025250     91400   17.5200 -111.8000      10.7        11       149       100
VIS    2025250     91400   17.5100 -111.8400       9.2        16       148        96
VIS    2025250     91400   17.5300 -111.8500       9.0        15       148        96
VIS    2025250     91400   17.5100 -111.8800       8.4        37       152        90
VIS    2025250     91400   17.5200 -111.9500      10.7        70       154       100
VIS    2025250     91400   17.5200 -111.9600      10.4        68       151       100
VIS    2025250     91400   17.5100 -112.1600      11.3        32       141        91
VIS    2025250     91400   17.5200 -112.2200       8.5        55       141        93
VIS    2025250     91400   17.5100 -112.2300       9.5        48       139        96
VIS    2025250     91400   17.5100 -112.3000       9.8        54       137        98
VIS    2025250     91400   17.5200 -112.3300       9.9        46       138       100
VIS    2025250     91400   17.5200 -112.3600      10.6        41       138       100
VIS    2025250     91400   17.5200 -112.3800      10.6        40       137       100
VIS    2025250     91400   17.5200 -112.4100      10.2        39       137        98
VIS    2025250     91400   17.5200 -112.4500       9.1        29       136       100
VIS    2025250     91400   17.5200 -112.4700       9.0        27       135       100
VIS    2025250     91400   17.4900 -112.4900       9.5        21       136       100
VIS    2025250     91400   17.5000 -112.5400      11.9        20       138        96
VIS    2025250     91400   17.4900 -112.5700      12.2        26       138        99
VIS    2025250     91400   17.5100 -112.5900      11.5        34       134        97
VIS    2025250     91400   17.4900 -112.6100      11.6        32       138       100
VIS    2025250     91400   17.5100 -112.6400      10.5        37       137       100
VIS    2025250     91400   17.4900 -112.7400      12.2         6       136       100
VIS    2025250     91400   17.4900 -112.7600      11.6         5       136        94
VIS    2025250     91400   17.4900 -112.8300       8.6       347       147        94
VIS    2025250     91400   17.4800 -112.9500      12.8        54       143        93
VIS    2025250     91400   17.4800 -112.9500      12.5        53       143        96
VIS    2025250     91400   17.4800 -113.0100      10.4        49       144        97
VIS    2025250     91400   17.5000 -113.0300      10.5        45       145       100
VIS    2025250     91400   17.4900 -113.0800       7.0        25       146        91
VIS    2025250     91400   17.5000 -113.1500       9.7        26       148        95
VIS    2025250     91400   17.4800 -113.1900       9.5        35       149        98
VIS    2025250     91400   17.4900 -113.2200       9.6        35       146       100
VIS    2025250     91400   17.4900 -113.2400       9.9        32       146        99
VIS    2025250     91400   17.4900 -113.3200      10.0        34       142        90
VIS    2025250     91400   17.4900 -113.3200      10.0        33       142        92
VIS    2025250     91400   17.4800 -113.3800       9.8        31       143       100
VIS    2025250     91400   17.4700 -113.3800       9.8        31       144       100
VIS    2025250     91400   17.4700 -113.4400       9.2        25       145       100
VIS    2025250     91400   17.4700 -113.4600       9.6        23       145       100
VIS    2025250     91400   17.4700 -113.4700       9.5        23       145       100
VIS    2025250     91400   17.4700 -113.5200       9.2        19       147       100
VIS    2025250     91400   17.4700 -113.5500       9.0        19       143       100
VIS    2025250     91400   17.4600 -113.5800       8.4        21       142       100
VIS    2025250     91400   17.4700 -113.6100       8.2        21       141        99
VIS    2025250     91400   17.4800 -113.7500       9.6         7       146        99
VIS    2025250     91400   17.4800 -113.7600       9.5         9       146        98
VIS    2025250     91400   17.4600 -113.8000       9.0        15       142        99
VIS    2025250     91400   17.4700 -113.8100       8.5        14       146        99
VIS    2025250     91400   17.4600 -113.8500       8.0        15       151        99
VIS    2025250     91400   17.4800 -113.8800       7.4        12       152        99
VIS    2025250     91400   17.4600 -113.9000       6.8        22       153        99
VIS    2025250     91400   17.4600 -113.9300       7.1        23       154        96
VIS    2025250     91400   17.4700 -114.0000       7.1         7       163       100
VIS    2025250     91400   17.4700 -114.0100       7.2         6       163       100
VIS    2025250     91400   17.4600 -114.0400       7.5       352       169       100
VIS    2025250     91400   17.4500 -114.0900      10.6       349       168       100
VIS    2025250     91400   17.4600 -114.2000       7.5       352       162       100
VIS    2025250     91400   17.4700 -114.2100       7.5       354       162        98
VIS    2025250     91400   17.4500 -114.2600       8.7       356       163       100
VIS    2025250     91400   17.4500 -114.2700       9.0       356       164       100
VIS    2025250     91400   17.4600 -114.3500       6.1         8       172        93
VIS    2025250     91400   17.4600 -114.3900       5.8        11       173       100
VIS    2025250     91400   17.4500 -114.4200       6.0         3       173       100
VIS    2025250     91400   17.4400 -114.4400       6.0       356       174        97
VIS    2025250     91400   17.4500 -114.5100       4.1       348       177        99
VIS    2025250     91400   17.4500 -114.6300       5.3       356       182        98
VIS    2025250     91400   17.4400 -114.6500       5.2       354       182        95
VIS    2025250     91400   17.4500 -114.6600       5.4       357       182        95
VIS    2025250     91400   17.4300 -114.7000       8.3        24       186        95
VIS    2025250     91400   17.4300 -115.1000       5.5       349       189       100
VIS    2025250     91400   17.4100 -116.2600      12.5       351       183       100
VIS    2025250     91400   17.3900 -116.9300       6.6        16       181        94
VIS    2025250     91400   17.3700 -118.0800      11.7         7       188        94
VIS    2025250     91400   17.3500 -118.1900       8.5        23       181        99
VIS    2025250     91400   17.3600 -118.2500      10.2       356       180        99
VIS    2025250     91400   17.3600 -118.2600       8.8       359       180        96
VIS    2025250     91400   17.3600 -118.2900       7.2       357       176        91
VIS    2025250     91400   17.5600 -109.9100       9.8        41       184       100
VIS    2025250     91400   17.5700 -109.9200      10.1        42       188       100
VIS    2025250     91400   17.5600 -109.9600      10.2        48       182        93
VIS    2025250     91400   17.5600 -110.0000       9.4        57       174        99
VIS    2025250     91400   17.5600 -110.0300       9.4        51       174        99
VIS    2025250     91400   17.5400 -110.0400       9.3        44       171       100
VIS    2025250     91400   17.5600 -110.0800       8.7        30       170        93
VIS    2025250     91400   17.5600 -110.1000       7.9        30       169        97
VIS    2025250     91400   17.5400 -110.1400       7.7        20       169        99
VIS    2025250     91400   17.5500 -110.1600       7.7        21       168       100
VIS    2025250     91400   17.5500 -110.3400      12.7        65       157        97
VIS    2025250     91400   17.5500 -110.3900      13.4        70       156       100
VIS    2025250     91400   17.5400 -110.4300      13.0        70       156       100
VIS    2025250     91400   17.5500 -110.4500      13.3        68       146       100
VIS    2025250     91400   17.5300 -110.4800      13.4        65       143       100
VIS    2025250     91400   17.5300 -110.5000      13.7        65       141        99
VIS    2025250     91400   17.5500 -110.5400      12.9        60       138        98
VIS    2025250     91400   17.5400 -110.5500      12.8        61       139        98
VIS    2025250     91400   17.5400 -110.6000      12.8        62       139        97
VIS    2025250     91400   17.5300 -110.6300      12.1        64       143        96
VIS    2025250     91400   17.5300 -110.6600      12.1        63       143        93
VIS    2025250     91400   17.5300 -110.6700      12.1        63       143        93
VIS    2025250     91400   17.5200 -110.7200      13.3        57       148        97
VIS    2025250     91400   17.5400 -110.7500      11.9        59       148        96
VIS    2025250     91400   17.5400 -110.7600      12.0        61       144        98
VIS    2025250     91400   17.5300 -110.7900      12.4        62       144        98
VIS    2025250     91400   17.5200 -110.8400      11.7        55       142        95
VIS    2025250     91400   17.5400 -110.9000       8.7        59       158        90
VIS    2025250     91400   17.5100 -110.9300       9.0        57       156        97
VIS    2025250     91400   17.5200 -110.9400       8.5        58       157        99
VIS    2025250     91400   17.5200 -110.9900       9.0        68       156        99
VIS    2025250     91400   17.5200 -111.0100       8.6        71       153       100
VIS    2025250     91400   17.5100 -111.1000       8.7        65       164        92
VIS    2025250     91400   17.5100 -111.1400       8.5        98       157        91
VIS    2025250     91400   17.5100 -111.1600       8.1        86       157       100
VIS    2025250     91400   17.5200 -111.2200       9.8        57       154        94
VIS    2025250     91400   17.5100 -111.2400       9.9        61       154        92
VIS    2025250     91400   17.5100 -111.2700       9.6        68       154        96
VIS    2025250     91400   17.5100 -111.3200       9.4        65       153        97
VIS    2025250     91400   17.5100 -111.3200       9.4        65       153        97
VIS    2025250     91400   17.5000 -111.3800       7.2        84       152        91
VIS    2025250     91400   17.5200 -111.4900      11.5        55       143        99
VIS    2025250     91400   17.5200 -111.5200      10.1        49       143        96
VIS    2025250     91400   17.5200 -111.5300      10.3        55       144        94
VIS    2025250     91400   17.5200 -111.5900       8.0        58       154        90
VIS    2025250     91400   17.5100 -111.6300       6.8        51       157        98
VIS    2025250     91400   17.5100 -111.6400       6.9        53       158       100
VIS    2025250     91400   17.5100 -111.6900       8.6        58       160        99
VIS    2025250     91400   17.5100 -111.7200       9.4        55       155        98
VIS    2025250     91400   17.5100 -111.7400      10.1        51       155        93
VIS    2025250     91400   17.4900 -111.8500       9.8        20       149        99
VIS    2025250     91400   17.5000 -111.8700       8.2        33       149        97
VIS    2025250     91400   17.5000 -111.9500       9.8        65       154        96
VIS    2025250     91400   17.4900 -112.0800       7.9        70       145        94
VIS    2025250     91400   17.4900 -112.1700      11.3        33       141        90
VIS    2025250     91400   17.4900 -112.1700       9.9        32       143        98
VIS    2025250     91400   17.4900 -112.2300       9.1        51       140        99
VIS    2025250     91400   17.5000 -112.2400       9.4        50       139        98
VIS    2025250     91400   17.4900 -112.3100      10.7        49       137        93
VIS    2025250     91400   17.4800 -112.3300      10.2        45       137       100
VIS    2025250     91400   17.4900 -112.3500      10.1        41       138       100
VIS    2025250     91400   17.4700 -112.4000      10.6        32       138       100
VIS    2025250     91400   17.4800 -112.4100      10.9        34       138       100
VIS    2025250     91400   17.4800 -112.4500      10.9        34       137       100
VIS    2025250     91400   17.4900 -112.4600      10.7        35       137       100
VIS    2025250     91400   17.4900 -112.5000       9.7        23       137       100
VIS    2025250     91400   17.4800 -112.5400      11.2        20       138       100
VIS    2025250     91400   17.4900 -112.5600      11.8        22       138       100
VIS    2025250     91400   17.4800 -112.6000      12.0        29       139        99
VIS    2025250     91400   17.4900 -112.6100      11.8        31       139       100
VIS    2025250     91400   17.4900 -112.6400      10.9        35       142       100
VIS    2025250     91400   17.4800 -112.7400      12.0         6       136       100
VIS    2025250     91400   17.4700 -112.8300       8.8       348       147       100
VIS    2025250     91400   17.4800 -112.8400       8.3       354       147        92
VIS    2025250     91400   17.4600 -112.9400      10.8        45       142        99
VIS    2025250     91400   17.4600 -112.9600      11.8        48       143       100
VIS    2025250     91400   17.4800 -113.0000      10.8        49       143        97
VIS    2025250     91400   17.4600 -113.0300      10.8        42       145        96
VIS    2025250     91400   17.4500 -113.1300       9.3        28       148       100
VIS    2025250     91400   17.4700 -113.1800      10.9        37       149        93
VIS    2025250     91400   17.4700 -113.1900       9.2        31       149        94
VIS    2025250     91400   17.4500 -113.2200       8.6        13       150        96
VIS    2025250     91400   17.4700 -113.2600       9.3        26       144       100
VIS    2025250     91400   17.4500 -113.2700       8.9        23       148        99
VIS    2025250     91400   17.4500 -113.3300       9.2        28       143        94
VIS    2025250     91400   17.4500 -113.3300       9.3        28       143        94
VIS    2025250     91400   17.4700 -113.3600       9.4        30       143       100
VIS    2025250     91400   17.4400 -113.4100       8.7        27       150        99
VIS    2025250     91400   17.4400 -113.4200       8.6        27       150        98
VIS    2025250     91400   17.4400 -113.4600       9.3        21       146        99
VIS    2025250     91400   17.4500 -113.4900       9.6        19       145        99
VIS    2025250     91400   17.4500 -113.5000       9.3        20       145       100
VIS    2025250     91400   17.4400 -113.5300       8.4        19       143        97
VIS    2025250     91400   17.4600 -113.5800       8.2        22       142       100
VIS    2025250     91400   17.4600 -113.6100       8.0        16       142        92
VIS    2025250     91400   17.4400 -113.7500      10.0       358       146        90
VIS    2025250     91400   17.4400 -113.7800       9.4        13       140        99
VIS    2025250     91400   17.4500 -113.8000       9.0        16       142       100
VIS    2025250     91400   17.4300 -113.8200       8.7        17       148       100
VIS    2025250     91400   17.4500 -113.8500       8.1        16       151       100
VIS    2025250     91400   17.4400 -113.8700       7.8        16       151       100
VIS    2025250     91400   17.4500 -113.9200       7.0        23       154       100
VIS    2025250     91400   17.4400 -113.9500       7.2        24       156        91
VIS    2025250     91400   17.4500 -113.9600       7.0        24       156        90
VIS    2025250     91400   17.4400 -114.0900       9.4       345       167        95
VIS    2025250     91400   17.4500 -114.1000       9.3       346       167        97
VIS    2025250     91400   17.4200 -114.1800       7.7       352       163       100
VIS    2025250     91400   17.4300 -114.2000       7.6       355       163       100
VIS    2025250     91400   17.4300 -114.2200       7.8       359       163       100
VIS    2025250     91400   17.4300 -114.2600       8.8       356       167       100
VIS    2025250     91400   17.4400 -114.2700       9.0       356       168       100
VIS    2025250     91400   17.4200 -114.3200       6.5       359       170       100
VIS    2025250     91400   17.4300 -114.3400       6.4         0       168       100
VIS    2025250     91400   17.4200 -114.3800       8.5       359       166       100
VIS    2025250     91400   17.4200 -114.3800       8.8       357       166        98
VIS    2025250     91400   17.4400 -114.4100       6.5         6       172       100
VIS    2025250     91400   17.4400 -114.4400       6.3       359       173        96
VIS    2025250     91400   17.3900 -115.9800      10.0        45       183        97
VIS    2025250     91400   17.3400 -118.1900       8.4        28       182        98
VIS    2025250     91400   17.5500 -109.2400       8.4        78       181        97
VIS    2025250     91400   17.5500 -109.2800       7.5        69       189        96
VIS    2025250     91400   17.5200 -109.9500       9.1        39       180        97
VIS    2025250     91400   17.5200 -109.9600       9.2        39       180        98
VIS    2025250     91400   17.5300 -110.0100       8.7        37       177        96
VIS    2025250     91400   17.5200 -110.0200       8.9        36       175       100
VIS    2025250     91400   17.5400 -110.0600       9.4        41       171        95
VIS    2025250     91400   17.5100 -110.1100       8.0        29       169        90
VIS    2025250     91400   17.5300 -110.1500       7.9        17       169        99
VIS    2025250     91400   17.5100 -110.3300      11.1        53       161        97
VIS    2025250     91400   17.5300 -110.3900      13.2        73       157        99
VIS    2025250     91400   17.5300 -110.4300      13.0        69       158       100
VIS    2025250     91400   17.5200 -110.4600      13.1        66       152       100
VIS    2025250     91400   17.5100 -110.4700      13.0        67       157       100
VIS    2025250     91400   17.5200 -110.4900      13.5        65       143       100
VIS    2025250     91400   17.5200 -110.5400      13.4        62       139       100
VIS    2025250     91400   17.5200 -110.5500      13.0        63       139        99
VIS    2025250     91400   17.5000 -110.5900      12.8        61       145       100
VIS    2025250     91400   17.5200 -110.6300      12.0        64       143        94
VIS    2025250     91400   17.5000 -110.6700      11.5        62       149        99
VIS    2025250     91400   17.5000 -110.6800      11.1        61       149        98
VIS    2025250     91400   17.5100 -110.7200      13.1        56       149        95
VIS    2025250     91400   17.5200 -110.7300      11.8        57       149        97
VIS    2025250     91400   17.5000 -110.7700      11.1        56       151       100
VIS    2025250     91400   17.5100 -110.7900      11.6        59       149       100
VIS    2025250     91400   17.5000 -110.8700       7.7        57       151        99
VIS    2025250     91400   17.4900 -110.9100       8.6        61       155        94
VIS    2025250     91400   17.5000 -110.9100       8.7        60       155        96
VIS    2025250     91400   17.4900 -110.9600       8.3        61       154        99
VIS    2025250     91400   17.5000 -110.9800       8.5        68       154        98
VIS    2025250     91400   17.5000 -111.2300       9.5        57       154        93
VIS    2025250     91400   17.5000 -111.2400       9.4        58       154        95
VIS    2025250     91400   17.4900 -111.2900       9.6        72       153        94
VIS    2025250     91400   17.5000 -111.3200       9.4        66       153        98
VIS    2025250     91400   17.4800 -111.3400       9.1        66       153        98
VIS    2025250     91400   17.4800 -111.3900       7.9        81       152        96
VIS    2025250     91400   17.4800 -111.4900       7.9        67       137        90
VIS    2025250     91400   17.4900 -111.5300       8.7        68       136        92
VIS    2025250     91400   17.4700 -111.5400       8.3        69       137        97
VIS    2025250     91400   17.4700 -111.5700       8.5        68       141        97
VIS    2025250     91400   17.4900 -111.5900       9.1        67       148        94
VIS    2025250     91400   17.4900 -111.7000       8.6        59       155       100
VIS    2025250     91400   17.4900 -111.7200       9.2        56       155        99
VIS    2025250     91400   17.4800 -111.8200      12.7        22       151        97
VIS    2025250     91400   17.4700 -111.8500      11.1        25       149        97
VIS    2025250     91400   17.4700 -111.9400       8.0        73       153        98
VIS    2025250     91400   17.4700 -111.9500       7.9        72       153        97
VIS    2025250     91400   17.4800 -111.9800       6.9        47       154        90
VIS    2025250     91400   17.4800 -112.1100       8.3        57       145        90
VIS    2025250     91400   17.4700 -112.1700       9.5        43       143        98
VIS    2025250     91400   17.4500 -112.2500       9.3        60       137        97
VIS    2025250     91400   17.4500 -112.2900       9.4        60       135        93
VIS    2025250     91400   17.4500 -112.3000       9.2        60       135        94
VIS    2025250     91400   17.4700 -112.3200       9.1        51       136        94
VIS    2025250     91400   17.4600 -112.3500      10.0        37       137        94
VIS    2025250     91400   17.4700 -112.4000      10.5        30       138       100
VIS    2025250     91400   17.4700 -112.4300      10.6        33       138       100
VIS    2025250     91400   17.4500 -112.4500      10.2        32       138       100
VIS    2025250     91400   17.4500 -112.4900      10.4        13       137       100
VIS    2025250     91400   17.4600 -112.5200       9.9        19       139        99
VIS    2025250     91400   17.4500 -112.5300       9.5        19       139       100
VIS    2025250     91400   17.4500 -112.5700      10.2        15       139       100
VIS    2025250     91400   17.4600 -112.6000      12.1        23       139        99
VIS    2025250     91400   17.4400 -112.6300       9.5        32       143        95
VIS    2025250     91400   17.4400 -112.6600       9.3        30       143        93
VIS    2025250     91400   17.4400 -112.7000       9.3         3       138        98
VIS    2025250     91400   17.4400 -112.7000       9.2         0       138        97
VIS    2025250     91400   17.4600 -112.7500      11.6         5       138        99
VIS    2025250     91400   17.4600 -112.8300       9.3       349       147        93
VIS    2025250     91400   17.4400 -112.8600      10.1       351       145        94
VIS    2025250     91400   17.4500 -112.9100       9.5        42       142        95
VIS    2025250     91400   17.4500 -112.9400      10.7        45       142       100
VIS    2025250     91400   17.4500 -112.9600      11.3        46       143       100
VIS    2025250     91400   17.4500 -113.0100      11.1        40       144        99
VIS    2025250     91400   17.4400 -113.1400       9.7        21       150        97
VIS    2025250     91400   17.4400 -113.2300       9.5        11       151        93
VIS    2025250     91400   17.4300 -113.2700       9.5        19       149        98
VIS    2025250     91400   17.4400 -113.2900       8.9        27       148        99
VIS    2025250     91400   17.4300 -113.3200       8.4        28       146        97
VIS    2025250     91400   17.4200 -113.3500       8.1        23       147        95
VIS    2025250     91400   17.4400 -113.3800       8.6        25       148        98
VIS    2025250     91400   17.4400 -113.4100       8.7        27       149        98
VIS    2025250     91400   17.4300 -113.4300       8.7        26       151       100
VIS    2025250     91400   17.4300 -113.4700       8.8        17       149        99
VIS    2025250     91400   17.4400 -113.4800       9.2        19       145        97
VIS    2025250     91400   17.4200 -113.5300       8.2        19       139       100
VIS    2025250     91400   17.4200 -113.5400       7.8        15       140        91
VIS    2025250     91400   17.4200 -113.5600       7.7        17       142        96
VIS    2025250     91400   17.4100 -113.5900       7.8        23       148        97
VIS    2025250     91400   17.4300 -113.6200       7.5        16       148        90
VIS    2025250     91400   17.4100 -113.6600       8.4        10       153       100
VIS    2025250     91400   17.4300 -113.7100      11.3       353       149        91
VIS    2025250     91400   17.4300 -113.7500       9.6       358       149        90
VIS    2025250     91400   17.4100 -113.7800       9.6        12       150        98
VIS    2025250     91400   17.4100 -113.8200       9.7        13       149       100
VIS    2025250     91400   17.4200 -113.8300       9.3        15       149       100
VIS    2025250     91400   17.4200 -113.8500       8.7        14       151        99
VIS    2025250     91400   17.4300 -113.8800       7.8        11       152        99
VIS    2025250     91400   17.4200 -113.9300       7.8        17       158        99
VIS    2025250     91400   17.4200 -113.9400       7.6        19       157        98
VIS    2025250     91400   17.4200 -113.9800       8.9        24       164        94
VIS    2025250     91400   17.4000 -113.9900       8.8        28       164        98
VIS    2025250     91400   17.4000 -114.1700       7.8       357       163        96
VIS    2025250     91400   17.4000 -114.1900       7.6       358       165        98
VIS    2025250     91400   17.4000 -114.2400       7.9         4       167        99
VIS    2025250     91400   17.4100 -114.2500       8.4         1       168       100
VIS    2025250     91400   17.4000 -114.2900       8.4       355       171       100
VIS    2025250     91400   17.4100 -114.3200       6.5       359       170       100
VIS    2025250     91400   17.4100 -114.3400       6.4       355       168        99
VIS    2025250     91400   17.3900 -114.3700       7.4       350       165        99
VIS    2025250     91400   17.4000 -114.3900       8.7       355       163       100
VIS    2025250     91400   17.4000 -114.4300       8.7        15       166        98
VIS    2025250     91400   17.3600 -116.0000       8.9        41       189        96
VIS    2025250     91400   17.3500 -116.0200       8.5        41       189        94
VIS    2025250     91400   17.3500 -116.2800       8.3        31       179        92
VIS    2025250     91400   17.3600 -116.3300      11.0        33       189        94
VIS    2025250     91400   17.3400 -116.3500      10.6        31       189        96
VIS    2025250     91400   17.5200 -109.2900       7.3        71       180        90
VIS    2025250     91400   17.5000 -109.9500       8.4        38       180       100
VIS    2025250     91400   17.5100 -109.9600       8.7        34       180        99
VIS    2025250     91400   17.4900 -110.0100       8.7        25       178        99
VIS    2025250     91400   17.5000 -110.0500       8.9        40       175       100
VIS    2025250     91400   17.4900 -110.0700       9.2        43       175        96
VIS    2025250     91400   17.5000 -110.0800       9.7        52       175        95
VIS    2025250     91400   17.5000 -110.1300       7.9        18       170        98
VIS    2025250     91400   17.5000 -110.3300      10.8        52       161        99
VIS    2025250     91400   17.4800 -110.3600       9.9        45       160        97
VIS    2025250     91400   17.4800 -110.4000      12.7        75       162        98
VIS    2025250     91400   17.5000 -110.4200      13.3        70       161       100
VIS    2025250     91400   17.4900 -110.4600      13.0        69       159       100
VIS    2025250     91400   17.4900 -110.4800      12.9        68       158       100
VIS    2025250     91400   17.4800 -110.5100      13.0        68       154        97
VIS    2025250     91400   17.4900 -110.5400      12.7        65       149       100
VIS    2025250     91400   17.5000 -110.5700      13.0        63       145        98
VIS    2025250     91400   17.4800 -110.6200      12.7        64       152       100
VIS    2025250     91400   17.4900 -110.6200      14.1        63       150        98
VIS    2025250     91400   17.4900 -110.6700      11.1        61       149       100
VIS    2025250     91400   17.4900 -110.7000      10.5        61       153        95
VIS    2025250     91400   17.4700 -110.7100       9.4        66       155        99
VIS    2025250     91400   17.4800 -110.7700      10.3        57       151        97
VIS    2025250     91400   17.4700 -110.7800       9.1        62       151        92
VIS    2025250     91400   17.4800 -110.8100       8.3        69       151        99
VIS    2025250     91400   17.4700 -110.8400       8.2        72       151        94
VIS    2025250     91400   17.4900 -110.8700       7.0        61       151        99
VIS    2025250     91400   17.4700 -110.9000       7.6        63       151        97
VIS    2025250     91400   17.4800 -110.9300       8.9        62       155        92
VIS    2025250     91400   17.4700 -110.9700       8.1        64       154       100
VIS    2025250     91400   17.4600 -110.9900       8.2        65       154       100
VIS    2025250     91400   17.4500 -111.2900       8.8        63       157       100
VIS    2025250     91400   17.4700 -111.3100       9.2        67       153       100
VIS    2025250     91400   17.4600 -111.3500       8.7        68       153       100
VIS    2025250     91400   17.4700 -111.3800       8.3        76       152        99
VIS    2025250     91400   17.4600 -111.4600       7.6        80       148        90
VIS    2025250     91400   17.4500 -111.4800       7.2        79       145        93
VIS    2025250     91400   17.4600 -111.5300       8.1        66       136        99
VIS    2025250     91400   17.4700 -111.5400       8.2        68       137        98
VIS    2025250     91400   17.4500 -111.5700       7.8        64       147        99
VIS    2025250     91400   17.4600 -111.6000       8.4        66       150        98
VIS    2025250     91400   17.4400 -111.9000       8.3        67       152        91
VIS    2025250     91400   17.4400 -111.9300       8.3        74       152        95
VIS    2025250     91400   17.4500 -111.9600       8.5        76       153        94
VIS    2025250     91400   17.4400 -112.0100       8.4        20       153        94
VIS    2025250     91400   17.4400 -112.1100       9.3        80       147        93
VIS    2025250     91400   17.4400 -112.1400       8.8        58       145        99
VIS    2025250     91400   17.4400 -112.1800       9.9        46       146        99
VIS    2025250     91400   17.4400 -112.1900       8.8        87       143       100
VIS    2025250     91400   17.4400 -112.2200       8.5        69       139       100
VIS    2025250     91400   17.4400 -112.2600      10.3        57       136        90
VIS    2025250     91400   17.4400 -112.3700      11.0        26       137       100
VIS    2025250     91400   17.4200 -112.4100       9.8        31       136       100
VIS    2025250     91400   17.4300 -112.4200       9.8        32       136       100
VIS    2025250     91400   17.4400 -112.4400       9.7        30       138       100
VIS    2025250     91400   17.4200 -112.4900       9.0        18       135       100
VIS    2025250     91400   17.4200 -112.5200      10.0        17       137       100
VIS    2025250     91400   17.4300 -112.5300       9.8        17       139       100
VIS    2025250     91400   17.4200 -112.5900       8.3         9       142        99
VIS    2025250     91400   17.4200 -112.5900       8.0         7       143        99
VIS    2025250     91400   17.4300 -112.6400       9.5        27       143        96
VIS    2025250     91400   17.4300 -112.6600      10.3        19       143        99
VIS    2025250     91400   17.4300 -112.7000       9.8         4       138        99
VIS    2025250     91400   17.4100 -112.7100       9.6         5       139        98
VIS    2025250     91400   17.4300 -112.7300      10.5         8       138       100
VIS    2025250     91400   17.4100 -112.7700      12.9         8       140       100
VIS    2025250     91400   17.4200 -112.8000      15.5         3       141       100
VIS    2025250     91400   17.4300 -112.8400      10.1       351       148        97
VIS    2025250     91400   17.4200 -112.8500      10.2       351       147        98
VIS    2025250     91400   17.4200 -112.8800       9.3        43       143        99
VIS    2025250     91400   17.4100 -112.9200       9.7        49       142        94
VIS    2025250     91400   17.4200 -112.9400      10.4        45       142        95
VIS    2025250     91400   17.4200 -112.9800      11.0        42       143       100
VIS    2025250     91400   17.4300 -112.9900      11.1        40       143       100
VIS    2025250     91400   17.4200 -113.1900      12.5        18       152        97
VIS    2025250     91400   17.4000 -113.2000      11.6        18       152        97
VIS    2025250     91400   17.4100 -113.2500      10.7        16       151        94
VIS    2025250     91400   17.4000 -113.3100       9.9        25       147       100
VIS    2025250     91400   17.4100 -113.3300       8.4        21       147        97
VIS    2025250     91400   17.4100 -113.3400       8.1        21       147        95
VIS    2025250     91400   17.4100 -113.3700       8.5        23       150        94
VIS    2025250     91400   17.4000 -113.4200       9.1        30       151        98
VIS    2025250     91400   17.4100 -113.4400       8.5        26       149       100
VIS    2025250     91400   17.4100 -113.4700       8.3        18       149        99
VIS    2025250     91400   17.3900 -113.5100       8.1        17       138       100
VIS    2025250     91400   17.4100 -113.5300       8.1        20       139       100
VIS    2025250     91400   17.4100 -113.5800       7.7        20       145        93
VIS    2025250     91400   17.4100 -113.5900       7.8        23       146        98
VIS    2025250     91400   17.3900 -113.6300       8.2        22       151        97
VIS    2025250     91400   17.4100 -113.6500       8.1        11       151       100
VIS    2025250     91400   17.4000 -113.7700       9.7        10       150        95
VIS    2025250     91400   17.4000 -113.8200       9.9        12       149       100
VIS    2025250     91400   17.3900 -113.8400       9.9        11       150       100
VIS    2025250     91400   17.4000 -113.8700       8.5         7       156        98
VIS    2025250     91400   17.4000 -113.8800       8.3         7       156        97
VIS    2025250     91400   17.3900 -113.9200       7.8        13       160        97
VIS    2025250     91400   17.4000 -114.0000       8.8        30       165        99
VIS    2025250     91400   17.3900 -114.1200      11.3        15       166       100
VIS    2025250     91400   17.3700 -114.1500       9.4         9       166       100
VIS    2025250     91400   17.3800 -114.1900       7.2       358       164        99
VIS    2025250     91400   17.3800 -114.2200       7.3         2       167        92
VIS    2025250     91400   17.3900 -114.2300       7.8         4       168        97
VIS    2025250     91400   17.3900 -114.2600       8.5       360       171       100
VIS    2025250     91400   17.3900 -114.2900       8.4       355       171       100
VIS    2025250     91400   17.3800 -114.3100       8.2       356       172       100
VIS    2025250     91400   17.3800 -114.3700       7.0       350       164        96
VIS    2025250     91400   17.3800 -114.4100       8.2         9       163        99
VIS    2025250     91400   17.3700 -114.5700       4.4        19       182        91
VIS    2025250     91400   17.3600 -114.6100       6.2         5       179        99
VIS    2025250     91400   17.3600 -114.6400       6.6        14       180        91
VIS    2025250     91400   17.3700 -114.6600       7.7        18       185        99
VIS    2025250     91400   17.3400 -116.0200       8.3        42       189        95
VIS    2025250     91400   17.3200 -116.3800      11.5        54       189        92
VIS    2025250     91400   17.2800 -118.3100      16.2        54       184        92
VIS    2025250     91400   17.4900 -109.9500       8.2        42       183        98
VIS    2025250     91400   17.4800 -109.9700       9.0        30       183       100
VIS    2025250     91400   17.4700 -110.0500       9.0        52       176        99
VIS    2025250     91400   17.4700 -110.0600       8.7        52       177        97
VIS    2025250     91400   17.4600 -110.1300       8.5        32       174        96
VIS    2025250     91400   17.4700 -110.3300      11.0        46       161        94
VIS    2025250     91400   17.4800 -110.3600      10.0        44       160        97
VIS    2025250     91400   17.4800 -110.4100      12.5        76       162        96
VIS    2025250     91400   17.4700 -110.4300      12.9        76       164        98
VIS    2025250     91400   17.4600 -110.4600      13.0        74       166        99
VIS    2025250     91400   17.4700 -110.5000      13.1        69       158        97
VIS    2025250     91400   17.4500 -110.5300      12.5        66       158        94
VIS    2025250     91400   17.4500 -110.5500      12.4        65       158        98
VIS    2025250     91400   17.4700 -110.5800      11.3        66       157       100
VIS    2025250     91400   17.4600 -110.6000      10.8        69       157       100
VIS    2025250     91400   17.4500 -110.6300       6.2        69       161        91
VIS    2025250     91400   17.4600 -110.6700       9.3        66       155        98
VIS    2025250     91400   17.4600 -110.7000       9.2        65       155        97
VIS    2025250     91400   17.4400 -110.8000       8.3        62       151        99
VIS    2025250     91400   17.4500 -110.8100       7.9        67       151        99
VIS    2025250     91400   17.4500 -110.8400       8.5        71       151       100
VIS    2025250     91400   17.4600 -110.8900       7.6        64       151        98
VIS    2025250     91400   17.4600 -110.9200       8.5        63       153        95
VIS    2025250     91400   17.4500 -110.9500       8.4        61       153       100
VIS    2025250     91400   17.4400 -110.9600       8.2        61       153       100
VIS    2025250     91400   17.4400 -111.0100       7.9        66       154        99
VIS    2025250     91400   17.4600 -111.0700       6.8        85       159        91
VIS    2025250     91400   17.4300 -111.2500       8.4        54       162        90
VIS    2025250     91400   17.4300 -111.2800       8.8        57       161        96
VIS    2025250     91400   17.4400 -111.3000       8.8        62       159       100
VIS    2025250     91400   17.4400 -111.3100       8.5        61       157       100
VIS    2025250     91400   17.4400 -111.3600       7.8        67       156        96
VIS    2025250     91400   17.4300 -111.3700       8.3        72       156        97
VIS    2025250     91400   17.4400 -111.4200       8.3        74       153        92
VIS    2025250     91400   17.4500 -111.4300       8.0        75       153        91
VIS    2025250     91400   17.4300 -111.4800       6.9        76       148        91
VIS    2025250     91400   17.4200 -111.4900       6.9        71       146        90
VIS    2025250     91400   17.4400 -111.5200       7.7        57       144        92
VIS    2025250     91400   17.4300 -111.5500       7.7        57       144        96
VIS    2025250     91400   17.4400 -111.5700       7.7        64       147        99
VIS    2025250     91400   17.4200 -111.7400      10.8        79       145        96
VIS    2025250     91400   17.4300 -111.7700      10.3        80       142        93
VIS    2025250     91400   17.4300 -111.7900       9.9        78       142        91
VIS    2025250     91400   17.4300 -111.8100       9.6        76       144        97
VIS    2025250     91400   17.4100 -111.8600       9.0        69       144       100
VIS    2025250     91400   17.4100 -111.8900       8.6        69       147        96
VIS    2025250     91400   17.4100 -111.9000       8.5        69       151        96
VIS    2025250     91400   17.4300 -112.0100       9.8        14       152        91
VIS    2025250     91400   17.4100 -112.1200       7.8        80       150        92
VIS    2025250     91400   17.4100 -112.1400       7.9        82       149        91
VIS    2025250     91400   17.4000 -112.1600       8.4        89       147        98
VIS    2025250     91400   17.4100 -112.3800      10.0        29       136       100
VIS    2025250     91400   17.4100 -112.4100      10.0        30       136        99
VIS    2025250     91400   17.4200 -112.4300       9.8        32       135        99
VIS    2025250     91400   17.4100 -112.4500       9.7        31       135        99
VIS    2025250     91400   17.4000 -112.4900       9.9        28       135       100
VIS    2025250     91400   17.4000 -112.5300      10.2        19       139        99
VIS    2025250     91400   17.4000 -112.5500      10.3        18       140       100
VIS    2025250     91400   17.4100 -112.5700       9.3        15       142        99
VIS    2025250     91400   17.4100 -112.6000       7.8         2       143        98
VIS    2025250     91400   17.4100 -112.6500      10.1        13       144        90
VIS    2025250     91400   17.4100 -112.6500      10.5        10       144        92
VIS    2025250     91400   17.4100 -112.7000      10.3         4       139       100
VIS    2025250     91400   17.3900 -112.7200      10.1        14       141        98
VIS    2025250     91400   17.4100 -112.7600      12.4         9       140       100
VIS    2025250     91400   17.4100 -112.7700      13.0         8       141        99
VIS    2025250     91400   17.4100 -112.8000      15.6         4       141       100
VIS    2025250     91400   17.3900 -112.8700       9.2        42       145        99
VIS    2025250     91400   17.4000 -112.9100       9.2        45       142       100
VIS    2025250     91400   17.4000 -112.9200       9.6        46       142       100
VIS    2025250     91400   17.3800 -112.9600      10.8        36       145        99
VIS    2025250     91400   17.3900 -112.9700      11.0        35       145        98
VIS    2025250     91400   17.4000 -113.2100      11.6        18       152        98
VIS    2025250     91400   17.3900 -113.2300      11.3        22       152        99
VIS    2025250     91400   17.3900 -113.2800      10.7        30       151       100
VIS    2025250     91400   17.3900 -113.3000      10.2        27       148       100
VIS    2025250     91400   17.3900 -113.3300       8.9        23       147        99
VIS    2025250     91400   17.3800 -113.3500       8.7        26       148       100
VIS    2025250     91400   17.3900 -113.3900       9.1        25       153        96
VIS    2025250     91400   17.3700 -113.4300       8.8        23       152        98
VIS    2025250     91400   17.3700 -113.4500       8.8        24       148        95
VIS    2025250     91400   17.3700 -113.4800       8.8        24       139        94
VIS    2025250     91400   17.3700 -113.5000       8.5        22       135        99
VIS    2025250     91400   17.3700 -113.5300       8.7        15       138        97
VIS    2025250     91400   17.3900 -113.5400       8.3        14       141        94
VIS    2025250     91400   17.3800 -113.5900       7.9        23       149        97
VIS    2025250     91400   17.3800 -113.6000       8.0        24       151        99
VIS    2025250     91400   17.3800 -113.6500       9.0        14       151        98
VIS    2025250     91400   17.3700 -113.7100      11.6       349       151        98
VIS    2025250     91400   17.3800 -113.7900      10.1        12       149       100
VIS    2025250     91400   17.3600 -113.8200      10.2        15       151       100
VIS    2025250     91400   17.3700 -113.8500      10.1        12       156       100
VIS    2025250     91400   17.3700 -113.8600       9.8        11       156       100
VIS    2025250     91400   17.3800 -113.9000       8.1         3       157       100
VIS    2025250     91400   17.3600 -113.9400       7.8         6       166       100
VIS    2025250     91400   17.3600 -114.0600      10.9       356       167        98
VIS    2025250     91400   17.3700 -114.1100      11.4        14       166       100
VIS    2025250     91400   17.3700 -114.1100      11.3        14       166       100
VIS    2025250     91400   17.3600 -114.1400       9.8        12       166       100
VIS    2025250     91400   17.3500 -114.1900       6.9         3       169       100
VIS    2025250     91400   17.3500 -114.2000       7.2         2       168        94
VIS    2025250     91400   17.3700 -114.2200       7.4         4       170        95
VIS    2025250     91400   17.3600 -114.2600       8.1         1       173        94
VIS    2025250     91400   17.3600 -114.2800       8.2       357       172        97
VIS    2025250     91400   17.3700 -114.3100       8.5       355       172        98
VIS    2025250     91400   17.3500 -114.3800       4.6       351       164        98
VIS    2025250     91400   17.3400 -114.4100       5.1        10       163        96
VIS    2025250     91400   17.3400 -114.4500       6.2        20       167        90
VIS    2025250     91400   17.3500 -114.5500       5.5        31       182        94
VIS    2025250     91400   17.3500 -114.5900       5.6        13       181       100
VIS    2025250     91400   17.3500 -114.6100       6.1        11       178        99
VIS    2025250     91400   17.3000 -116.0800       4.7        42       189        94
VIS    2025250     91400   17.3000 -116.2300       7.4         9       188       100
VIS    2025250     91400   17.3000 -116.2400       7.4         8       188       100
VIS    2025250     91400   17.4600 -110.0500       9.1        54       178        95
VIS    2025250     91400   17.4600 -110.0600       8.6        52       179        96
VIS    2025250     91400   17.4300 -110.3200      11.3        62       162        96
VIS    2025250     91400   17.4500 -110.3400      10.6        46       161        97
VIS    2025250     91400   17.4300 -110.4000      13.4        78       161        95
VIS    2025250     91400   17.4500 -110.4400      12.9        80       162        93
VIS    2025250     91400   17.4400 -110.4800      14.2        74       167        99
VIS    2025250     91400   17.4500 -110.5300      12.3        65       158        95
VIS    2025250     91400   17.4300 -110.5600      10.9        63       160        99
VIS    2025250     91400   17.4300 -110.5800      11.1        66       160        99
VIS    2025250     91400   17.4300 -110.6200       8.5        75       160       100
VIS    2025250     91400   17.4400 -110.6400       5.4        67       161        98
VIS    2025250     91400   17.4300 -110.6800       5.3        71       161        96
VIS    2025250     91400   17.4400 -110.6900       5.4        72       163       100
VIS    2025250     91400   17.4400 -110.7900       8.4        59       151        99
VIS    2025250     91400   17.4400 -110.8200       8.5        66       151       100
VIS    2025250     91400   17.4400 -110.8400       8.6        71       151       100
VIS    2025250     91400   17.4300 -110.9100       7.8        63       152       100
VIS    2025250     91400   17.4100 -110.9600       7.4        54       154        99
VIS    2025250     91400   17.4200 -110.9600       7.8        55       154        97
VIS    2025250     91400   17.4300 -111.0000       8.3        60       154        99
VIS    2025250     91400   17.4200 -111.0200       8.0        62       153        91
VIS    2025250     91400   17.4200 -111.0900       6.1        98       156        90
VIS    2025250     91400   17.4200 -111.1100       5.9        95       156        95
VIS    2025250     91400   17.4100 -111.2000       9.3        70       158        96
VIS    2025250     91400   17.4200 -111.2300       8.4        57       161        98
VIS    2025250     91400   17.4300 -111.2700       8.7        56       161        94
VIS    2025250     91400   17.4000 -111.3400       9.4        52       161        99
VIS    2025250     91400   17.4100 -111.3500       8.0        53       161        93
VIS    2025250     91400   17.4000 -111.4000       8.5        54       157        99
VIS    2025250     91400   17.4100 -111.4200       8.0        60       155       100
VIS    2025250     91400   17.4200 -111.4500       7.5        71       153        99
VIS    2025250     91400   17.4000 -111.4900       7.2        68       148        96
VIS    2025250     91400   17.4000 -111.4900       7.4        65       148        97
VIS    2025250     91400   17.4000 -111.5200       7.7        56       147        91
VIS    2025250     91400   17.4000 -111.5700       5.8        59       153        99
VIS    2025250     91400   17.4100 -111.5800       6.4        62       154        99
VIS    2025250     91400   17.3900 -111.6900      10.5        63       148        95
VIS    2025250     91400   17.4000 -111.7100      11.0        65       145        97
VIS    2025250     91400   17.4000 -111.7500      10.9        74       142       100
VIS    2025250     91400   17.4000 -111.7700      10.4        75       140       100
VIS    2025250     91400   17.4000 -111.7900      10.0        75       140       100
VIS    2025250     91400   17.4000 -111.8300       9.1        69       142       100
VIS    2025250     91400   17.3900 -111.8600       8.9        67       142       100
VIS    2025250     91400   17.4100 -111.8900       8.6        69       147        96
VIS    2025250     91400   17.4100 -111.9100       8.4        70       151        93
VIS    2025250     91400   17.4000 -111.9900       5.5        38       153        98
VIS    2025250     91400   17.3800 -112.1600       9.8        93       149        98
VIS    2025250     91400   17.3800 -112.1800      11.3        96       150        97
VIS    2025250     91400   17.3900 -112.2600       8.9        56       136       100
VIS    2025250     91400   17.3800 -112.3100       8.5        74       133       100
VIS    2025250     91400   17.3900 -112.3900      12.4        34       134        94
VIS    2025250     91400   17.3900 -112.4500      10.9        31       136        99
VIS    2025250     91400   17.3900 -112.4800      10.3        30       136       100
VIS    2025250     91400   17.3900 -112.4900      10.1        28       135        99
VIS    2025250     91400   17.3900 -112.5200      10.4        23       137        97
VIS    2025250     91400   17.3900 -112.5400      10.6        21       140        98
VIS    2025250     91400   17.3900 -112.5800      10.4        21       142        99
VIS    2025250     91400   17.3900 -112.6500      10.8         0       144        99
VIS    2025250     91400   17.3800 -112.6800       9.6         9       144        96
VIS    2025250     91400   17.3800 -112.7100       9.5        17       142        99
VIS    2025250     91400   17.3800 -112.7100      10.0        15       142       100
VIS    2025250     91400   17.3800 -112.7500      12.0        19       142       100
VIS    2025250     91400   17.3800 -112.7900      11.2        12       141        98
VIS    2025250     91400   17.3800 -112.8700       9.3        43       145        98
VIS    2025250     91400   17.3700 -112.9000       9.4        43       145       100
VIS    2025250     91400   17.3600 -112.9200       9.7        41       145       100
VIS    2025250     91400   17.3700 -112.9500      10.6        37       145       100
VIS    2025250     91400   17.3600 -112.9800      10.9        37       146        99
VIS    2025250     91400   17.3600 -113.0400      12.0        35       150        92
VIS    2025250     91400   17.3500 -113.1400      12.2        16       148        94
VIS    2025250     91400   17.3500 -113.2000      10.7        33       151        92
VIS    2025250     91400   17.3600 -113.2200      10.9        32       149        97
VIS    2025250     91400   17.3600 -113.2500      10.9        29       149       100
VIS    2025250     91400   17.3600 -113.2800      10.8        31       151        95
VIS    2025250     91400   17.3600 -113.3000      10.7        31       149        92
VIS    2025250     91400   17.3600 -113.3400       9.2        35       150        99
VIS    2025250     91400   17.3600 -113.3700       9.2        30       153        99
VIS    2025250     91400   17.3700 -113.4000       9.1        24       154       100
VIS    2025250     91400   17.3500 -113.4200       8.7        20       149       100
VIS    2025250     91400   17.3500 -113.4600       8.9        21       148        98
VIS    2025250     91400   17.3600 -113.4700       9.4        24       139        99
VIS    2025250     91400   17.3500 -113.5000       8.7        22       138        99
VIS    2025250     91400   17.3600 -113.5400       8.7        14       141        96
VIS    2025250     91400   17.3600 -113.5500       8.6        13       145        93
VIS    2025250     91400   17.3600 -113.5800       8.2        16       151        92
VIS    2025250     91400   17.3600 -113.6200       8.3        21       155        99
VIS    2025250     91400   17.3500 -113.6700       9.9       348       156       100
VIS    2025250     91400   17.3500 -113.7000      11.3       350       152        99
VIS    2025250     91400   17.3600 -113.7200      11.6       350       151        98
VIS    2025250     91400   17.3500 -113.7600      10.4        20       154       100
VIS    2025250     91400   17.3300 -113.8000      10.1        23       154        99
VIS    2025250     91400   17.3500 -113.8300      10.2        18       155       100
VIS    2025250     91400   17.3500 -113.8400      10.2        16       156       100
VIS    2025250     91400   17.3500 -113.8700      10.0        13       157        99
VIS    2025250     91400   17.3400 -113.9100       8.7         7       163       100
VIS    2025250     91400   17.3500 -113.9200       8.7         9       164        95
VIS    2025250     91400   17.3300 -113.9700       8.1       354       166        93
VIS    2025250     91400   17.3400 -113.9900       7.6       343       167       100
VIS    2025250     91400   17.3400 -114.0000       8.0       338       168       100
VIS    2025250     91400   17.3300 -114.1700       8.3        14       166        99
VIS    2025250     91400   17.3300 -114.1900       6.9         6       169       100
VIS    2025250     91400   17.3300 -114.2300       7.0       358       173        98
VIS    2025250     91400   17.3300 -114.2600       7.3       356       173        93
VIS    2025250     91400   17.3300 -114.3100       8.6         1       171        99
VIS    2025250     91400   17.3400 -114.4000       4.3         4       164        99
VIS    2025250     91400   17.3200 -114.4600       5.5        11       168        96
VIS    2025250     91400   17.3300 -114.4800       5.1        20       172        94
VIS    2025250     91400   17.3300 -114.6100       5.8        16       179        94
VIS    2025250     91400   17.3300 -114.6400       6.4        16       179        94
VIS    2025250     91400   17.3100 -114.7100       6.6       349       183       100
VIS    2025250     91400   17.3200 -114.7100       6.9       341       183        98
VIS    2025250     91400   17.2900 -116.0600       5.8        42       189        94
VIS    2025250     91400   17.2900 -116.1700       4.2       357       189        99
VIS    2025250     91400   17.2900 -116.2400       7.1         6       189       100
VIS    2025250     91400   17.2900 -116.2700       6.6         4       189        98
VIS    2025250     91400   17.4100 -110.3300      12.6        64       163        98
VIS    2025250     91400   17.4100 -110.3600      12.6        68       162       100
VIS    2025250     91400   17.4200 -110.3800      11.8        72       161        98
VIS    2025250     91400   17.4100 -110.4200      11.9        68       161       100
VIS    2025250     91400   17.4200 -110.4400      11.2        68       164        99
VIS    2025250     91400   17.4000 -110.4800      10.6        50       166        91
VIS    2025250     91400   17.4100 -110.4900      10.6        48       164        90
VIS    2025250     91400   17.4200 -110.5200      10.4        55       159        96
VIS    2025250     91400   17.4100 -110.6800       5.0        70       163        98
VIS    2025250     91400   17.4000 -110.7400       9.9        46       156       100
VIS    2025250     91400   17.4200 -110.7500       9.4        51       152       100
VIS    2025250     91400   17.4000 -110.8100       8.9        55       154        99
VIS    2025250     91400   17.4000 -110.8200       8.8        56       154        99
VIS    2025250     91400   17.4100 -110.8400       8.6        57       155       100
VIS    2025250     91400   17.4000 -110.8800       7.2        61       154        98
VIS    2025250     91400   17.4100 -110.9500       6.7        54       154        94
VIS    2025250     91400   17.4000 -111.0100       8.2        56       152        99
VIS    2025250     91400   17.4000 -111.0500       9.3        58       151        90
VIS    2025250     91400   17.3900 -111.1000       5.2       104       154        92
VIS    2025250     91400   17.4000 -111.1300       6.6       103       156        98
VIS    2025250     91400   17.3900 -111.1400       6.8       105       156        97
VIS    2025250     91400   17.3900 -111.1700       8.9        94       156        98
VIS    2025250     91400   17.3800 -111.2200       9.2        69       158        92
VIS    2025250     91400   17.3900 -111.2400       9.2        67       158        93
VIS    2025250     91400   17.3900 -111.2700      10.2        58       161        93
VIS    2025250     91400   17.3800 -111.3000      10.6        57       161        97
VIS    2025250     91400   17.4000 -111.3400      10.1        54       161        98
VIS    2025250     91400   17.3900 -111.3600       9.4        54       159        98
VIS    2025250     91400   17.3800 -111.3900       9.2        54       156        98
VIS    2025250     91400   17.3800 -111.4200       8.9        52       152        98
VIS    2025250     91400   17.3900 -111.4600       7.8        60       151       100
VIS    2025250     91400   17.3900 -111.4900       7.4        62       149       100
VIS    2025250     91400   17.3900 -111.4900       7.4        63       148        99
VIS    2025250     91400   17.3700 -111.5300       7.6        52       148        97
VIS    2025250     91400   17.3700 -111.6600       6.9        36       148        95
VIS    2025250     91400   17.3800 -111.7300      11.5        63       145        96
VIS    2025250     91400   17.3700 -111.7400      12.1        61       141        99
VIS    2025250     91400   17.3700 -111.7900      10.5        65       130       100
VIS    2025250     91400   17.3700 -111.8000       9.7        66       130       100
VIS    2025250     91400   17.3600 -111.8200       9.1        64       130       100
VIS    2025250     91400   17.3800 -111.8600       8.8        65       142       100
VIS    2025250     91400   17.3600 -111.8900       8.1        60       140        95
VIS    2025250     91400   17.3800 -111.9100       7.9        64       145        92
VIS    2025250     91400   17.3600 -112.1000       6.6        61       148       100
VIS    2025250     91400   17.3600 -112.1200       6.5        73       150        99
VIS    2025250     91400   17.3700 -112.1600       9.8        93       149        99
VIS    2025250     91400   17.3600 -112.1700      10.0        93       149       100
VIS    2025250     91400   17.3700 -112.2300       9.4        40       138        98
VIS    2025250     91400   17.3700 -112.2600       9.6        46       136        99
VIS    2025250     91400   17.3500 -112.4000      14.0        32       136        97
VIS    2025250     91400   17.3600 -112.5200      10.8        28       140        90
VIS    2025250     91400   17.3600 -112.6500      12.1       348       144        95
VIS    2025250     91400   17.3600 -112.6600      11.4       351       144        99
VIS    2025250     91400   17.3400 -112.6900       8.9        39       145        91
VIS    2025250     91400   17.3400 -112.7300       9.3        36       144        97
VIS    2025250     91400   17.3500 -112.9000       8.9        36       146        90
VIS    2025250     91400   17.3400 -112.9200       9.7        37       146        95
VIS    2025250     91400   17.3300 -112.9800      11.2        39       146       100
VIS    2025250     91400   17.3300 -112.9800      11.1        39       146        99
VIS    2025250     91400   17.3400 -113.0600      12.1        33       152        97
VIS    2025250     91400   17.3300 -113.0700      12.6        32       151       100
VIS    2025250     91400   17.3300 -113.1100      13.0         8       148        99
VIS    2025250     91400   17.3500 -113.1400      12.3        15       148        95
VIS    2025250     91400   17.3300 -113.1800      10.8        34       151       100
VIS    2025250     91400   17.3300 -113.2000      10.3        37       153        95
VIS    2025250     91400   17.3500 -113.2100      10.6        34       151        90
VIS    2025250     91400   17.3300 -113.2500      10.4        34       153        93
VIS    2025250     91400   17.3300 -113.2700      11.1        29       150        94
VIS    2025250     91400   17.3200 -113.3400       9.5        23       153       100
VIS    2025250     91400   17.3400 -113.3600       9.0        33       153        93
VIS    2025250     91400   17.3200 -113.4100       9.1        30       139       100
VIS    2025250     91400   17.3200 -113.4200       9.0        29       139       100
VIS    2025250     91400   17.3200 -113.4500       8.6        22       149       100
VIS    2025250     91400   17.3400 -113.4900       8.8        20       148        98
VIS    2025250     91400   17.3400 -113.4900       8.8        20       148        98
VIS    2025250     91400   17.3400 -113.5300       8.8        11       147        98
VIS    2025250     91400   17.3300 -113.5700       8.8        11       152        96
VIS    2025250     91400   17.3200 -113.5900       9.2        10       155        99
VIS    2025250     91400   17.3100 -113.6400      11.7       357       157        96
VIS    2025250     91400   17.3200 -113.6600      10.1       349       156        93
VIS    2025250     91400   17.3300 -113.6900      10.1       349       154        99
VIS    2025250     91400   17.3300 -113.6900      10.0       349       154        99
VIS    2025250     91400   17.3200 -113.7400       8.7        16       154        99
VIS    2025250     91400   17.3300 -113.7800       9.5        22       154        99
VIS    2025250     91400   17.3100 -113.8000      10.1        24       157       100
VIS    2025250     91400   17.3200 -113.8300      10.4        24       158       100
VIS    2025250     91400   17.3200 -113.8400      10.6        19       159       100
VIS    2025250     91400   17.3200 -113.8800      10.3        11       162       100
VIS    2025250     91400   17.3100 -113.9200      10.5        14       164       100
VIS    2025250     91400   17.3100 -113.9300      10.1        11       164        99
VIS    2025250     91400   17.3200 -113.9700       8.1       354       164        92
VIS    2025250     91400   17.3100 -113.9900       7.8       355       164        98
VIS    2025250     91400   17.3100 -114.0800       8.3        14       164        95
VIS    2025250     91400   17.3200 -114.0900       8.1        10       164        96
VIS    2025250     91400   17.3200 -114.1300       8.3        15       163        98
VIS    2025250     91400   17.3000 -114.1700       8.5        18       168       100
VIS    2025250     91400   17.3100 -114.1800       8.1        15       169        98
VIS    2025250     91400   17.3100 -114.2200       6.5       352       176        99
VIS    2025250     91400   17.3100 -114.2400       6.8       352       176       100
VIS    2025250     91400   17.3000 -114.2900       6.8       352       171       100
VIS    2025250     91400   17.3000 -114.3100       7.0       352       170       100
VIS    2025250     91400   17.2900 -114.3500      10.3        15       170        95
VIS    2025250     91400   17.2900 -114.4000       6.8        10       166        94
VIS    2025250     91400   17.2900 -114.4200       6.9         6       167        96
VIS    2025250     91400   17.3100 -114.6600       6.3         6       184        98
VIS    2025250     91400   17.3000 -114.7000       6.5       355       188        99
VIS    2025250     91400   17.2900 -114.7200       5.9       357       187        97
VIS    2025250     91400   17.2400 -116.7900       6.0       165       189        96
VIS    2025250     91400   17.4000 -110.3200      12.2        64       164        98
VIS    2025250     91400   17.3800 -110.3600      12.1        64       162       100
VIS    2025250     91400   17.4000 -110.3700      12.1        67       161       100
VIS    2025250     91400   17.4000 -110.4200      11.1        64       161        99
VIS    2025250     91400   17.3900 -110.4500      10.4        64       165       100
VIS    2025250     91400   17.3800 -110.7000      10.1        46       159       100
VIS    2025250     91400   17.3800 -111.0300       9.0        61       151        94
VIS    2025250     91400   17.3800 -111.0600       8.3        62       151        90
VIS    2025250     91400   17.3700 -111.1300       6.2       101       154        94
VIS    2025250     91400   17.3800 -111.1600       7.9        98       154        90
VIS    2025250     91400   17.3600 -111.1800       4.2        54       158        90
VIS    2025250     91400   17.3600 -111.2600       9.2        71       159       100
VIS    2025250     91400   17.3600 -111.3200      10.0        57       159        99
VIS    2025250     91400   17.3700 -111.3200      10.0        57       159        99
VIS    2025250     91400   17.3700 -111.3600      10.2        59       159        96
VIS    2025250     91400   17.3700 -111.4100       9.0        54       153        99
VIS    2025250     91400   17.3600 -111.4200       8.9        59       152       100
VIS    2025250     91400   17.3700 -111.4600       8.4        58       151        97
VIS    2025250     91400   17.3600 -111.4800       7.7        52       151        98
VIS    2025250     91400   17.3700 -111.5300       7.6        51       148        96
VIS    2025250     91400   17.3700 -111.5600       7.2        51       151        97
VIS    2025250     91400   17.3600 -111.6300       7.5        60       148        91
VIS    2025250     91400   17.3600 -111.6600       6.6        43       148        95
VIS    2025250     91400   17.3400 -111.7000       8.3        51       138        98
VIS    2025250     91400   17.3600 -111.7300      11.8        61       138        95
VIS    2025250     91400   17.3600 -111.7500      12.5        59       131       100
VIS    2025250     91400   17.3500 -111.7800      11.2        61       127       100
VIS    2025250     91400   17.3600 -111.8000       9.9        65       127       100
VIS    2025250     91400   17.3400 -111.8300       8.8        61       126       100
VIS    2025250     91400   17.3600 -111.8600       8.6        60       135        99
VIS    2025250     91400   17.3400 -111.8900       7.9        57       135        95
VIS    2025250     91400   17.3400 -111.9900       7.4        58       144        91
VIS    2025250     91400   17.3400 -112.0200       8.7        48       145        96
VIS    2025250     91400   17.3500 -112.0500       8.5        52       146        93
VIS    2025250     91400   17.3400 -112.0600       8.3        45       147        92
VIS    2025250     91400   17.3400 -112.1700      10.2        98       149        94
VIS    2025250     91400   17.3400 -112.2300       9.0        38       141        91
VIS    2025250     91400   17.3400 -112.2300       9.5        39       141        98
VIS    2025250     91400   17.3300 -112.3200      11.3        73       135        98
VIS    2025250     91400   17.3400 -112.3900      14.3        33       136        95
VIS    2025250     91400   17.3400 -112.4100      14.1        33       136        97
VIS    2025250     91400   17.3200 -112.6900      15.5        59       146        91
VIS    2025250     91400   17.3300 -112.7200       9.0        51       145        92
VIS    2025250     91400   17.3100 -112.7300       9.3        50       145        93
VIS    2025250     91400   17.3300 -112.7700       9.4        48       146        93
VIS    2025250     91400   17.3300 -112.8200      12.6        36       143        94
VIS    2025250     91400   17.3200 -112.8400      13.0        33       143        90
VIS    2025250     91400   17.3300 -112.9200       8.8        31       147        96
VIS    2025250     91400   17.3300 -112.9300       9.3        32       147       100
VIS    2025250     91400   17.3100 -112.9700      11.8        34       149       100
VIS    2025250     91400   17.3300 -113.0500      13.1        31       152       100
VIS    2025250     91400   17.3100 -113.0800      13.6        17       150        95
VIS    2025250     91400   17.3200 -113.1100      13.2         7       149        99
VIS    2025250     91400   17.3100 -113.1300      12.3        16       150        94
VIS    2025250     91400   17.3100 -113.1700      11.2        31       154        94
VIS    2025250     91400   17.3200 -113.2000      10.4        36       153        96
VIS    2025250     91400   17.3200 -113.2900      11.7        28       150        96
VIS    2025250     91400   17.3100 -113.3100      11.4        28       150        96
VIS    2025250     91400   17.3200 -113.3400      10.0        21       153       100
VIS    2025250     91400   17.3100 -113.3600       9.6        21       153        99
VIS    2025250     91400   17.3000 -113.4100       9.2        34       138       100
VIS    2025250     91400   17.2900 -113.4300       8.7        30       139        99
VIS    2025250     91400   17.3100 -113.4500       8.6        24       148       100
VIS    2025250     91400   17.3000 -113.4900       8.9        15       154        99
VIS    2025250     91400   17.3100 -113.5100       9.2        14       152       100
VIS    2025250     91400   17.3100 -113.5500       8.9         9       151        98
VIS    2025250     91400   17.3100 -113.5700       8.9        12       155        98
VIS    2025250     91400   17.3100 -113.6000      10.2         7       157        99
VIS    2025250     91400   17.3000 -113.6100      11.1         6       157        97
VIS    2025250     91400   17.3100 -113.6600      10.4       349       156        91
VIS    2025250     91400   17.3100 -113.6800       9.8       349       155        94
VIS    2025250     91400   17.3000 -113.7200       8.4        18       156       100
VIS    2025250     91400   17.3100 -113.7300       8.9        19       154       100
VIS    2025250     91400   17.3000 -113.7800       9.2        23       157       100
VIS    2025250     91400   17.3000 -113.8100      10.2        25       159       100
VIS    2025250     91400   17.3000 -113.8100      10.4        25       159       100
VIS    2025250     91400   17.2900 -113.8800       9.8         7       162        98
VIS    2025250     91400   17.3000 -113.9000      10.7        14       162       100
VIS    2025250     91400   17.3000 -113.9300      10.5        15       164       100
VIS    2025250     91400   17.2900 -114.0400       8.5        19       164        93
VIS    2025250     91400   17.2900 -114.0600       8.8        15       165        98
VIS    2025250     91400   17.2900 -114.0700       8.7        15       165        98
VIS    2025250     91400   17.2900 -114.1000       8.6        14       165       100
VIS    2025250     91400   17.2800 -114.1500       8.2        18       167        99
VIS    2025250     91400   17.2900 -114.1700       8.7        18       167       100
VIS    2025250     91400   17.2700 -114.2000      11.1        12       178       100
VIS    2025250     91400   17.2900 -114.2300       7.1       349       176       100
VIS    2025250     91400   17.2900 -114.2400       7.0       349       176       100
VIS    2025250     91400   17.2800 -114.2900       6.2       353       171        99
VIS    2025250     91400   17.2900 -114.2900       6.6       353       171       100
VIS    2025250     91400   17.2800 -114.3500      10.4        13       170        91
VIS    2025250     91400   17.2900 -114.3500      10.1        14       170        93
VIS    2025250     91400   17.2700 -114.4100       7.8        10       168        98
VIS    2025250     91400   17.2800 -114.4200       7.3         7       168        97
VIS    2025250     91400   17.2700 -114.6800       5.7       356       188        98
VIS    2025250     91400   17.2700 -114.7000       5.7       359       189        99
VIS    2025250     91400   17.2300 -116.7900       6.6       164       190        99
VIS    2025250     91400   17.1800 -117.8900       4.7       101       189        95
VIS    2025250     91400   17.1900 -117.9700      12.3        24       184       100
VIS    2025250     91400   17.1800 -118.2800       4.6        51       181        95
VIS    2025250     91400   17.3600 -110.3400      12.2        65       164        99
VIS    2025250     91400   17.3700 -110.3500      12.2        65       162        99
VIS    2025250     91400   17.3700 -110.3800      11.8        63       160        99
VIS    2025250     91400   17.3700 -110.4200       9.9        58       164        99
VIS    2025250     91400   17.3600 -110.4500       7.2        65       164        95
VIS    2025250     91400   17.3700 -110.4700      10.2        60       165       100
VIS    2025250     91400   17.3500 -110.6600       6.4        39       166        99
VIS    2025250     91400   17.3700 -110.7200      10.0        47       159       100
VIS    2025250     91400   17.3700 -110.7400       9.1        51       156        91
VIS    2025250     91400   17.3400 -111.0900       6.3        99       150       100
VIS    2025250     91400   17.3400 -111.1100       6.4        94       150        97
VIS    2025250     91400   17.3300 -111.1500       5.1        80       154        98
VIS    2025250     91400   17.3400 -111.1500       4.3        77       154        94
VIS    2025250     91400   17.3500 -111.3700      10.1        61       157        97
VIS    2025250     91400   17.3500 -111.4200       9.4        59       152        97
VIS    2025250     91400   17.3300 -111.4500       9.6        61       150        93
VIS    2025250     91400   17.3200 -111.5900       9.9        56       147        90
VIS    2025250     91400   17.3300 -111.6200       9.1        64       146        90
VIS    2025250     91400   17.3200 -111.6300       8.8        63       144        91
VIS    2025250     91400   17.3400 -111.6500       7.5        49       147        91
VIS    2025250     91400   17.3400 -111.7000       9.0        53       138        96
VIS    2025250     91400   17.3200 -111.7700      11.0        49       124        95
VIS    2025250     91400   17.3200 -111.7900      10.7        48       120        96
VIS    2025250     91400   17.3100 -111.8300       9.6        53       117       100
VIS    2025250     91400   17.3300 -111.8300       9.2        58       124       100
VIS    2025250     91400   17.3200 -111.8800       7.7        55       129        97
VIS    2025250     91400   17.3200 -111.8900       7.6        54       130        96
VIS    2025250     91400   17.3200 -111.9200       7.2        51       132        96
VIS    2025250     91400   17.3200 -111.9700       7.4        57       143        99
VIS    2025250     91400   17.3200 -111.9800       7.4        60       143        98
VIS    2025250     91400   17.3200 -112.0200       8.8        48       145        94
VIS    2025250     91400   17.3100 -112.1100       8.2        55       144        97
VIS    2025250     91400   17.3100 -112.2300      10.7        41       145        95
VIS    2025250     91400   17.3200 -112.2400      10.2        40       144        96
VIS    2025250     91400   17.3200 -112.3200      11.5        76       135        93
VIS    2025250     91400   17.3000 -112.5500      16.0       343       142        98
VIS    2025250     91400   17.2900 -112.7600      10.1        45       146        97
VIS    2025250     91400   17.2900 -112.7600      10.3        41       146        95
VIS    2025250     91400   17.2900 -112.8000      11.2        35       146        96
VIS    2025250     91400   17.2800 -112.9200      12.2        17       149        93
VIS    2025250     91400   17.2900 -112.9500      12.1        23       150        98
VIS    2025250     91400   17.2900 -112.9800      12.2        31       150       100
VIS    2025250     91400   17.2800 -113.0600      12.7        24       152        99
VIS    2025250     91400   17.2900 -113.0800      12.7        21       150        95
VIS    2025250     91400   17.2900 -113.1100      12.7        17       150        97
VIS    2025250     91400   17.3000 -113.1400      11.8        22       154        90
VIS    2025250     91400   17.2900 -113.1600      11.2        28       154        90
VIS    2025250     91400   17.2900 -113.2000      10.8        36       154       100
VIS    2025250     91400   17.2700 -113.2500      11.5        15       154        99
VIS    2025250     91400   17.2900 -113.2800      11.6        25       154        93
VIS    2025250     91400   17.2700 -113.3300      10.7        23       157       100
VIS    2025250     91400   17.2800 -113.3500      10.4        20       158        98
VIS    2025250     91400   17.2900 -113.3900       9.8        37       148        99
VIS    2025250     91400   17.2700 -113.4100       9.6        37       148        98
VIS    2025250     91400   17.2700 -113.4300       9.2        35       152        98
VIS    2025250     91400   17.2900 -113.4500       8.5        24       152        98
VIS    2025250     91400   17.2700 -113.5000       8.7        14       156        98
VIS    2025250     91400   17.2800 -113.5100       8.9        13       155        99
VIS    2025250     91400   17.2700 -113.5400       9.0        13       156        98
VIS    2025250     91400   17.2700 -113.5800      10.1        17       156        98
VIS    2025250     91400   17.2800 -113.6100      11.0         9       156        99
VIS    2025250     91400   17.2700 -113.6300      10.3        13       156        98
VIS    2025250     91400   17.2800 -113.6500      11.8         4       156        96
VIS    2025250     91400   17.2600 -113.6900       8.2        32       157       100
VIS    2025250     91400   17.2600 -113.7300       8.5        28       159       100
VIS    2025250     91400   17.2800 -113.7400       8.5        22       158       100
VIS    2025250     91400   17.2800 -113.7800       8.6        20       158        98
VIS    2025250     91400   17.2700 -113.8100       9.4        19       161        97
VIS    2025250     91400   17.2700 -113.8400       8.4       346       161        96
VIS    2025250     91400   17.2700 -113.8900       9.1        10       160       100
VIS    2025250     91400   17.2800 -113.9200      10.0        17       162       100
VIS    2025250     91400   17.2700 -113.9300       9.7        23       163        99
VIS    2025250     91400   17.2800 -113.9800       9.8         9       163        90
VIS    2025250     91400   17.2700 -113.9900       9.5         4       163        96
VIS    2025250     91400   17.2500 -114.0200       9.2       354       164        95
VIS    2025250     91400   17.2500 -114.0700       8.8        15       165        98
VIS    2025250     91400   17.2600 -114.1000       9.1        15       165        99
VIS    2025250     91400   17.2700 -114.1200       8.1        16       165        97
VIS    2025250     91400   17.2500 -114.1400       8.2        14       171        96
VIS    2025250     91400   17.2600 -114.1800       9.6        13       175       100
VIS    2025250     91400   17.2700 -114.1900      11.0        12       178       100
VIS    2025250     91400   17.2500 -114.2700       6.6       352       173       100
VIS    2025250     91400   17.2500 -114.2700       6.5       353       173       100
VIS    2025250     91400   17.2600 -114.4000       8.2        11       168        99
VIS    2025250     91400   17.2400 -114.4300       8.4         9       173        98
VIS    2025250     91400   17.2600 -114.4400       7.6         7       173        97
VIS    2025250     91400   17.2600 -114.6900       5.0       355       189       100
VIS    2025250     91400   17.2000 -116.8200       4.4       161       188        91
VIS    2025250     91400   17.1600 -117.8700       6.8       152       188        90
VIS    2025250     91400   17.1700 -117.8900       4.7       104       188        96
VIS    2025250     91400   17.3500 -110.3200      11.2        68       167        97
VIS    2025250     91400   17.3500 -110.3400      12.2        65       165        98
VIS    2025250     91400   17.3500 -110.3700      11.6        63       162        99
VIS    2025250     91400   17.3500 -110.3900      10.6        63       162        92
VIS    2025250     91400   17.3300 -110.4300       8.3        57       163       100
VIS    2025250     91400   17.3500 -110.4500       7.0        64       165        90
VIS    2025250     91400   17.3400 -110.6600       6.7        41       165       100
VIS    2025250     91400   17.3400 -110.6900       5.9        48       163        91
VIS    2025250     91400   17.3300 -110.7300      12.0        58       157        96
VIS    2025250     91400   17.3300 -110.7400      12.2        58       155        98
VIS    2025250     91400   17.3400 -110.7700      10.7        57       155        96
VIS    2025250     91400   17.3200 -110.8200       4.2        88       156        91
VIS    2025250     91400   17.3300 -110.8400       4.7        91       156        90
VIS    2025250     91400   17.3300 -111.0600       5.7        93       154        94
VIS    2025250     91400   17.3300 -111.0900       6.0        99       150        98
VIS    2025250     91400   17.3300 -111.1000       6.3        91       150       100
VIS    2025250     91400   17.3200 -111.1500       5.9        85       154       100
VIS    2025250     91400   17.3300 -111.1600       5.0        78       154        97
VIS    2025250     91400   17.3100 -111.1900       7.5        73       156        91
VIS    2025250     91400   17.3100 -111.2500       8.1        76       157        95
VIS    2025250     91400   17.3000 -111.3800       8.8        80       152        98
VIS    2025250     91400   17.3100 -111.4200      10.4        59       152        97
VIS    2025250     91400   17.3100 -111.4800      10.6        59       138        97
VIS    2025250     91400   17.3000 -111.5000      10.2        62       138        96
VIS    2025250     91400   17.3200 -111.5900      10.0        55       146        92
VIS    2025250     91400   17.3200 -111.6100       9.6        59       144        95
VIS    2025250     91400   17.3100 -111.6400       9.2        56       140        93
VIS    2025250     91400   17.2900 -111.6800       9.6        44       127       100
VIS    2025250     91400   17.3100 -111.7000       9.6        54       129        94
VIS    2025250     91400   17.3100 -111.7200       9.7        53       126        91
VIS    2025250     91400   17.2900 -111.7700      10.6        49       116        99
VIS    2025250     91400   17.3000 -111.7800      10.9        48       116        96
VIS    2025250     91400   17.3100 -111.8300       9.7        52       117       100
VIS    2025250     91400   17.3000 -111.8600       8.9        51       119        99
VIS    2025250     91400   17.3000 -111.8600       8.7        52       121        99
VIS    2025250     91400   17.2900 -111.9100       7.9        46       129        97
VIS    2025250     91400   17.2900 -111.9400       7.5        46       130        97
VIS    2025250     91400   17.2900 -111.9500       7.8        44       130        97
VIS    2025250     91400   17.3100 -111.9900       7.8        57       143        99
VIS    2025250     91400   17.3000 -112.0300       9.0        45       143        98
VIS    2025250     91400   17.2900 -112.0400       8.7        48       140        99
VIS    2025250     91400   17.3000 -112.1100       8.0        58       144        93
VIS    2025250     91400   17.2800 -112.1300       7.5        61       141        93
VIS    2025250     91400   17.2900 -112.2500      12.3        38       141        99
VIS    2025250     91400   17.2800 -112.2900      11.8        37       133       100
VIS    2025250     91400   17.2900 -112.3200      11.5        59       133        97
VIS    2025250     91400   17.2800 -112.5500      16.0       341       141        92
VIS    2025250     91400   17.2800 -112.5700      16.1       343       142        99
VIS    2025250     91400   17.2700 -112.6900      13.6       348       151        99
VIS    2025250     91400   17.2700 -112.7600      11.7        36       146        99
VIS    2025250     91400   17.2700 -112.7700      11.7        35       146        99
VIS    2025250     91400   17.2600 -112.9300      12.6        21       151        98
VIS    2025250     91400   17.2600 -112.9400      12.5        22       151        98
VIS    2025250     91400   17.2700 -112.9700      12.1        29       150       100
VIS    2025250     91400   17.2800 -113.0100      12.7        30       148        94
VIS    2025250     91400   17.2600 -113.0400      13.1        27       150       100
VIS    2025250     91400   17.2600 -113.0700      12.7        29       151       100
VIS    2025250     91400   17.2700 -113.1000      12.5        24       153        99
VIS    2025250     91400   17.2700 -113.1200      12.8        21       153        99
VIS    2025250     91400   17.2700 -113.1600      12.1        23       154        91
VIS    2025250     91400   17.2600 -113.1900      12.4        26       153        99
VIS    2025250     91400   17.2500 -113.2100      12.6        24       152        99
VIS    2025250     91400   17.2500 -113.2300      12.4        31       153        98
VIS    2025250     91400   17.2600 -113.3200      11.1        24       157       100
VIS    2025250     91400   17.2600 -113.3500      10.9        22       157        95
VIS    2025250     91400   17.2700 -113.3800      10.1        37       156        97
VIS    2025250     91400   17.2700 -113.4100       9.6        35       153        99
VIS    2025250     91400   17.2700 -113.4300       9.3        35       153        99
VIS    2025250     91400   17.2500 -113.4500       9.1        30       156        97
VIS    2025250     91400   17.2600 -113.4900       8.7        17       156        97
VIS    2025250     91400   17.2600 -113.5200       8.6        12       156        97
VIS    2025250     91400   17.2500 -113.5600       9.1        13       156       100
VIS    2025250     91400   17.2500 -113.5700       9.2        14       156       100
VIS    2025250     91400   17.2600 -113.6000      10.5        21       156        97
VIS    2025250     91400   17.2600 -113.6400       9.4        16       156        98
VIS    2025250     91400   17.2500 -113.6500       8.9        18       156        99
VIS    2025250     91400   17.2400 -113.6900       8.5        32       158       100
VIS    2025250     91400   17.2500 -113.7100       8.6        33       159        99
VIS    2025250     91400   17.2400 -113.7500       8.1        28       160        94
VIS    2025250     91400   17.2400 -113.8200      11.2         6       163        99
VIS    2025250     91400   17.2400 -113.8300      11.3         4       163        99
VIS    2025250     91400   17.2300 -113.8500      10.5       358       161        95
VIS    2025250     91400   17.2400 -113.8800       7.8       351       161        90
VIS    2025250     91400   17.2500 -113.9200       8.8        25       162       100
VIS    2025250     91400   17.2400 -113.9800       7.3       353       166        97
VIS    2025250     91400   17.2400 -114.0100       8.6       356       164        94
VIS    2025250     91400   17.2500 -114.0200       9.0       355       164        94
VIS    2025250     91400   17.2300 -114.0600      10.4         9       163       100
VIS    2025250     91400   17.2300 -114.1000      11.6        10       169       100
VIS    2025250     91400   17.2300 -114.1100      11.2        12       169       100
VIS    2025250     91400   17.2400 -114.1500       8.2        12       173        91
VIS    2025250     91400   17.2400 -114.1800       7.9        10       176        94
VIS    2025250     91400   17.2200 -114.2000       7.4       352       177       100
VIS    2025250     91400   17.2200 -114.2500       7.3       351       174       100
VIS    2025250     91400   17.2400 -114.2700       6.6       353       173       100
VIS    2025250     91400   17.2400 -114.2900       5.5       354       172       100
VIS    2025250     91400   17.2300 -114.4100       9.5        11       173        98
VIS    2025250     91400   17.2200 -114.4300       9.7        12       174       100
VIS    2025250     91400   17.1800 -116.0400       5.5       348       190        99
VIS    2025250     91400   17.1500 -117.8700       7.1       151       188        90
VIS    2025250     91400   17.1300 -117.9200       6.1        88       188        96
VIS    2025250     91400   17.1400 -118.0300      15.7       130       183        94
VIS    2025250     91400   17.1400 -118.2700       5.5        15       177        99
VIS    2025250     91400   17.3100 -110.3600      11.6        53       164       100
VIS    2025250     91400   17.3100 -110.3900      10.2        51       163        99
VIS    2025250     91400   17.3200 -110.6700       6.2        44       162        93
VIS    2025250     91400   17.3200 -110.6900       5.8        44       162        97
VIS    2025250     91400   17.3000 -110.7400      13.2        63       158        99
VIS    2025250     91400   17.3000 -110.7500      13.1        63       158        98
VIS    2025250     91400   17.3000 -110.7900      12.3        62       157       100
VIS    2025250     91400   17.3000 -110.8400       8.5        61       160        98
VIS    2025250     91400   17.2900 -110.9800       6.6        55       159        96
VIS    2025250     91400   17.2900 -111.0000       7.1        57       158        92
VIS    2025250     91400   17.3000 -111.0300       6.5        71       156        94
VIS    2025250     91400   17.3000 -111.0500       5.7        94       155        97
VIS    2025250     91400   17.3000 -111.0700       5.3       104       154        99
VIS    2025250     91400   17.3000 -111.1400       7.4        89       154       100
VIS    2025250     91400   17.3000 -111.1600       6.7        89       154       100
VIS    2025250     91400   17.2900 -111.2000       6.7        77       155       100
VIS    2025250     91400   17.3000 -111.2200       8.8        68       156        99
VIS    2025250     91400   17.3000 -111.3900       9.3        81       145        94
VIS    2025250     91400   17.2800 -111.4000       9.3        74       142       100
VIS    2025250     91400   17.2800 -111.4500      10.7        55       137        98
VIS    2025250     91400   17.2900 -111.4600      10.6        54       137        97
VIS    2025250     91400   17.2800 -111.5000      10.1        58       136        98
VIS    2025250     91400   17.2800 -111.5500      14.1        52       137        93
VIS    2025250     91400   17.2800 -111.6900       9.5        45       122       100
VIS    2025250     91400   17.2700 -111.7100       9.2        52       114        93
VIS    2025250     91400   17.2700 -111.7400      10.5        54       114        92
VIS    2025250     91400   17.2800 -111.7600      10.7        50       116       100
VIS    2025250     91400   17.2700 -111.8100      11.7        46       115       100
VIS    2025250     91400   17.2700 -111.8400      10.8        46       115       100
VIS    2025250     91400   17.2600 -111.8700      10.2        44       116        99
VIS    2025250     91400   17.2700 -111.8700      10.0        45       116        98
VIS    2025250     91400   17.2800 -111.9000       8.3        45       126        97
VIS    2025250     91400   17.2800 -111.9400       7.7        44       129        98
VIS    2025250     91400   17.2700 -111.9600       8.0        36       129        97
VIS    2025250     91400   17.2700 -111.9900       8.6        31       131       100
VIS    2025250     91400   17.2700 -112.0200       7.9        48       136        99
VIS    2025250     91400   17.2800 -112.0700       7.9        58       140        99
VIS    2025250     91400   17.2600 -112.0900       7.5        60       138       100
VIS    2025250     91400   17.2600 -112.1300       7.0        67       138        98
VIS    2025250     91400   17.2500 -112.2000       7.5        29       141        98
VIS    2025250     91400   17.2600 -112.3000      11.7        38       132        92
VIS    2025250     91400   17.2600 -112.3300      12.2        73       133        99
VIS    2025250     91400   17.2600 -112.3700      11.9        68       134        96
VIS    2025250     91400   17.2500 -112.4900      12.6        36       141        97
VIS    2025250     91400   17.2500 -112.5100      12.6        36       141        97
VIS    2025250     91400   17.2600 -112.6700      11.9        14       151        99
VIS    2025250     91400   17.2600 -112.7100      13.6        15       151        94
VIS    2025250     91400   17.2600 -112.7300      14.0        23       150        91
VIS    2025250     91400   17.2400 -112.7500      13.9        24       150        98
VIS    2025250     91400   17.2500 -112.7700      12.8        30       146        98
VIS    2025250     91400   17.2400 -112.9000      12.5        33       150       100
VIS    2025250     91400   17.2500 -112.9200      12.4        24       151        97
VIS    2025250     91400   17.2500 -112.9500      12.0        30       153       100
VIS    2025250     91400   17.2500 -112.9900      12.6        31       152       100
VIS    2025250     91400   17.2400 -113.0200      12.7        26       151        99
VIS    2025250     91400   17.2500 -113.0500      12.8        29       151       100
VIS    2025250     91400   17.2500 -113.0700      12.8        29       151       100
VIS    2025250     91400   17.2400 -113.0900      12.6        31       154        99
VIS    2025250     91400   17.2300 -113.1200      13.5        24       155        99
VIS    2025250     91400   17.2300 -113.1700      12.3        23       155        98
VIS    2025250     91400   17.2300 -113.1700      12.3        23       154        98
VIS    2025250     91400   17.2300 -113.2100      12.6        26       151       100
VIS    2025250     91400   17.2300 -113.2500      12.0        39       154       100
VIS    2025250     91400   17.2300 -113.2800      10.8        45       155       100
VIS    2025250     91400   17.2400 -113.3000      10.5        35       156        95
VIS    2025250     91400   17.2400 -113.3300      10.9        33       157        98
VIS    2025250     91400   17.2300 -113.3500      10.8        34       159        99
VIS    2025250     91400   17.2400 -113.4200       9.6        36       159        97
VIS    2025250     91400   17.2400 -113.4500       9.4        33       159        98
VIS    2025250     91400   17.2300 -113.4700       9.6        28       160        99
VIS    2025250     91400   17.2400 -113.5000       9.6        16       161        98
VIS    2025250     91400   17.2400 -113.5400       9.1         4       160        98
VIS    2025250     91400   17.2400 -113.5600       8.7         6       160        96
VIS    2025250     91400   17.2400 -113.5700       8.9         9       160        97
VIS    2025250     91400   17.2400 -113.6200      10.8        29       157        92
VIS    2025250     91400   17.2300 -113.6300       9.2        23       158        93
VIS    2025250     91400   17.2300 -113.6700       8.2        30       158        99
VIS    2025250     91400   17.2100 -113.7100       9.3        32       160        92
VIS    2025250     91400   17.2200 -113.7300       9.7        33       160        93
VIS    2025250     91400   17.2200 -113.8200      11.7         6       163        99
VIS    2025250     91400   17.2100 -113.8800       6.5        48       164        92
VIS    2025250     91400   17.2200 -113.9800       7.2       353       166        97
VIS    2025250     91400   17.2000 -114.0200      10.2        11       163        94
VIS    2025250     91400   17.2000 -114.0500      10.6        10       163        99
VIS    2025250     91400   17.2200 -114.0500      10.1        10       163        96
VIS    2025250     91400   17.2200 -114.1000      11.8         9       169        99
VIS    2025250     91400   17.2000 -114.1200      11.5         8       169       100
VIS    2025250     91400   17.2100 -114.1500      10.9        13       175       100
VIS    2025250     91400   17.2200 -114.1800       8.0       351       176        92
VIS    2025250     91400   17.2200 -114.2100       7.7       350       176       100
VIS    2025250     91400   17.2100 -114.2400       7.5       350       174        99
VIS    2025250     91400   17.2200 -114.2500       7.3       351       174       100
VIS    2025250     91400   17.2000 -114.3700       8.4        18       171        94
VIS    2025250     91400   17.1900 -114.4200       8.4        15       176       100
VIS    2025250     91400   17.2000 -114.4200       8.9        13       174       100
VIS    2025250     91400   17.1900 -114.4600       8.1        11       176        98
VIS    2025250     91400   17.2000 -114.5000       4.7       350       174        97
VIS    2025250     91400   17.1500 -116.0300       4.6       352       182        95
VIS    2025250     91400   17.1700 -116.0400       5.4       347       186        98
VIS    2025250     91400   17.1700 -116.1300       8.4       353       187       100
VIS    2025250     91400   17.1200 -118.2700       6.3         2       176        95
VIS    2025250     91400   17.3000 -110.3200      10.7        60       169        99
VIS    2025250     91400   17.3000 -110.3500      11.9        55       165       100
VIS    2025250     91400   17.3000 -110.3700      11.1        50       163       100
VIS    2025250     91400   17.2900 -110.6700       6.8        57       160        99
VIS    2025250     91400   17.2800 -110.7500      12.6        61       158        92
VIS    2025250     91400   17.2900 -110.7500      13.0        62       158        96
VIS    2025250     91400   17.2900 -110.7800      12.3        62       158       100
VIS    2025250     91400   17.2800 -110.8300      10.1        71       162        99
VIS    2025250     91400   17.2800 -110.8600       8.3        67       161        94
VIS    2025250     91400   17.2700 -110.8900       7.2        79       161       100
VIS    2025250     91400   17.2700 -110.9100       6.6        90       161        97
VIS    2025250     91400   17.2600 -111.0400       9.0        92       158        99
VIS    2025250     91400   17.2800 -111.1100       8.2        87       154        98
VIS    2025250     91400   17.2800 -111.1500       7.7        90       154        97
VIS    2025250     91400   17.2800 -111.1900       7.1        79       154        91
VIS    2025250     91400   17.2700 -111.4000       9.3        74       142       100
VIS    2025250     91400   17.2500 -111.4200       9.7        66       134        92
VIS    2025250     91400   17.2600 -111.5000      10.6        51       130        96
VIS    2025250     91400   17.2600 -111.5400      13.3        49       132        97
VIS    2025250     91400   17.2500 -111.5800      14.9        48       122        94
VIS    2025250     91400   17.2500 -111.5800      14.9        48       122        95
VIS    2025250     91400   17.2700 -111.6400      11.2        51       127        98
VIS    2025250     91400   17.2600 -111.7500      11.7        56       114        98
VIS    2025250     91400   17.2400 -111.7700      12.5        57       115       100
VIS    2025250     91400   17.2500 -111.8100      12.1        45       115       100
VIS    2025250     91400   17.2400 -111.8400      11.8        42       115        99
VIS    2025250     91400   17.2600 -111.8600      10.9        44       116        99
VIS    2025250     91400   17.2600 -111.8800      10.6        41       116        99
VIS    2025250     91400   17.2600 -111.9100      10.2        38       123        96
VIS    2025250     91400   17.2400 -111.9400       9.5        37       125        94
VIS    2025250     91400   17.2400 -111.9700       8.6        34       129        98
VIS    2025250     91400   17.2500 -112.0000       8.6        31       131       100
VIS    2025250     91400   17.2500 -112.0400       7.9        55       135       100
VIS    2025250     91400   17.2500 -112.0500       7.9        58       134        98
VIS    2025250     91400   17.2400 -112.0800       8.2        58       133        97
VIS    2025250     91400   17.2400 -112.1800       8.4        28       141        96
VIS    2025250     91400   17.2400 -112.2000       8.3        29       141        96
VIS    2025250     91400   17.2300 -112.2500      10.8        38       142       100
VIS    2025250     91400   17.2400 -112.2600      10.9        37       141        99
VIS    2025250     91400   17.2400 -112.3300      12.3        65       133        99
VIS    2025250     91400   17.2300 -112.3400      12.6        64       133       100
VIS    2025250     91400   17.2300 -112.3700      12.9        62       135        99
VIS    2025250     91400   17.2300 -112.5000      12.1        35       141        98
VIS    2025250     91400   17.2200 -112.5800      14.3        60       143       100
VIS    2025250     91400   17.2300 -112.7100      13.5        18       153        97
VIS    2025250     91400   17.2300 -112.7400      13.6        22       151        98
VIS    2025250     91400   17.2300 -112.7600      13.7        24       151        98
VIS    2025250     91400   17.2200 -112.8100      13.6        51       151       100
VIS    2025250     91400   17.2300 -112.8700       7.7        19       153        95
VIS    2025250     91400   17.2200 -112.9100      12.5        32       150       100
VIS    2025250     91400   17.2300 -112.9900      11.5        20       152       100
VIS    2025250     91400   17.2100 -113.0200      12.7        25       152       100
VIS    2025250     91400   17.2100 -113.0400      13.1        28       153       100
VIS    2025250     91400   17.2100 -113.0600      13.1        30       153       100
VIS    2025250     91400   17.2200 -113.1300      13.4        25       155        96
VIS    2025250     91400   17.2100 -113.1600      12.7        22       155        94
VIS    2025250     91400   17.2100 -113.1900      11.9        24       153        94
VIS    2025250     91400   17.2200 -113.2100      12.3        25       151        99
VIS    2025250     91400   17.2000 -113.2600      11.5        43       155        95
VIS    2025250     91400   17.2000 -113.2600      11.2        44       155        97
VIS    2025250     91400   17.2000 -113.3100      10.1        42       160        97
VIS    2025250     91400   17.2100 -113.3200      10.1        38       160        99
VIS    2025250     91400   17.2100 -113.3700      10.4        36       160       100
VIS    2025250     91400   17.2100 -113.4300       9.4        28       160        90
VIS    2025250     91400   17.2100 -113.4300       9.3        30       160        94
VIS    2025250     91400   17.2100 -113.4700       9.8        25       161        96
VIS    2025250     91400   17.2100 -113.4900      10.6        17       163       100
VIS    2025250     91400   17.1900 -113.5200      11.9        17       162       100
VIS    2025250     91400   17.2100 -113.5700       9.1       359       161        91
VIS    2025250     91400   17.2100 -113.5800       8.7       358       160        90
VIS    2025250     91400   17.2000 -113.6200       9.4        16       160        96
VIS    2025250     91400   17.2000 -113.6400       9.9        20       159        94
VIS    2025250     91400   17.1900 -113.6900       7.2        14       162        91
VIS    2025250     91400   17.2000 -113.7000       8.3        29       159        99
VIS    2025250     91400   17.2000 -113.8800       6.4        48       164        92
VIS    2025250     91400   17.1800 -114.0000      11.6        10       166       100
VIS    2025250     91400   17.1900 -114.0200      12.1        13       165        97
VIS    2025250     91400   17.2000 -114.0500      10.4        11       163        98
VIS    2025250     91400   17.1800 -114.1100       7.9       349       177        98
VIS    2025250     91400   17.1800 -114.1600       7.6       350       178       100
VIS    2025250     91400   17.1800 -114.2300       9.1       349       173        99
VIS    2025250     91400   17.1900 -114.3000       5.1        42       169        99
VIS    2025250     91400   17.1800 -114.3200       4.7        38       169        95
VIS    2025250     91400   17.1900 -114.3800       7.5        18       170        96
VIS    2025250     91400   17.1900 -114.4100       8.3        16       176       100
VIS    2025250     91400   17.1900 -114.4300       8.2        15       176        99
VIS    2025250     91400   17.1900 -114.4500       8.0        12       176        97
VIS    2025250     91400   17.1700 -114.4900       5.1       353       178        98
VIS    2025250     91400   17.1700 -114.5400       4.3       351       178        99
VIS    2025250     91400   17.1700 -114.5400       4.3       352       178        99
VIS    2025250     91400   17.1400 -115.5500       9.7       193       171        99
VIS    2025250     91400   17.0700 -118.3000       8.0         4       183        97
VIS    2025250     91400   17.2500 -110.6700       6.9        51       161       100
VIS    2025250     91400   17.2600 -110.8400       8.9        67       162        93
VIS    2025250     91400   17.2500 -110.8900       6.5        76       164       100
VIS    2025250     91400   17.2600 -110.9100       6.6        85       162        99
VIS    2025250     91400   17.2400 -110.9700       5.5        72       161        97
VIS    2025250     91400   17.2500 -111.0500       9.1        92       158       100
VIS    2025250     91400   17.2500 -111.0600       9.2        91       159       100
VIS    2025250     91400   17.2500 -111.2400       8.7        60       153       100
VIS    2025250     91400   17.2400 -111.3100       8.6        63       153        92
VIS    2025250     91400   17.2300 -111.4600      14.8        52       126        96
VIS    2025250     91400   17.2400 -111.4700      14.7        51       126        97
VIS    2025250     91400   17.2400 -111.5200      11.8        46       129        94
VIS    2025250     91400   17.2400 -111.5400      14.0        47       127        95
VIS    2025250     91400   17.2400 -111.5700      15.0        48       122        92
VIS    2025250     91400   17.2200 -111.5900      15.5        50       116       100
VIS    2025250     91400   17.2200 -111.7300      11.3        49       113        99
VIS    2025250     91400   17.2200 -111.7500      11.3        50       120       100
VIS    2025250     91400   17.2200 -111.7700      11.8        52       120       100
VIS    2025250     91400   17.2200 -111.8100      12.0        40       117       100
VIS    2025250     91400   17.2200 -111.8500      11.8        37       115        99
VIS    2025250     91400   17.2300 -111.8700      12.3        37       115        98
VIS    2025250     91400   17.2200 -111.8800      12.4        35       115        98
VIS    2025250     91400   17.2300 -111.9200      11.1        33       123        99
VIS    2025250     91400   17.2200 -111.9600       9.2        34       127        97
VIS    2025250     91400   17.2200 -111.9700       9.0        34       127        96
VIS    2025250     91400   17.2300 -112.0000       9.1        35       131       100
VIS    2025250     91400   17.2200 -112.0400       9.2        40       134        98
VIS    2025250     91400   17.2300 -112.0600       7.9        48       134        92
VIS    2025250     91400   17.2300 -112.0800       7.8        53       133        95
VIS    2025250     91400   17.2300 -112.1600       8.5        30       139        97
VIS    2025250     91400   17.2200 -112.1800       8.1        31       139        99
VIS    2025250     91400   17.2100 -112.2500      11.1        37       140        97
VIS    2025250     91400   17.2200 -112.2600      10.9        37       141        99
VIS    2025250     91400   17.2100 -112.3400      13.7        53       135       100
VIS    2025250     91400   17.2100 -112.3600      13.6        58       135        99
VIS    2025250     91400   17.2200 -112.3700      13.1        60       135        98
VIS    2025250     91400   17.2100 -112.5000      13.0        34       142        99
VIS    2025250     91400   17.2200 -112.5200      12.3        35       141        98
VIS    2025250     91400   17.2100 -112.5600      14.3        59       143       100
VIS    2025250     91400   17.2100 -112.5800      14.3        59       143       100
VIS    2025250     91400   17.2100 -112.6500      15.3        22       153       100
VIS    2025250     91400   17.1900 -112.6800      15.0        22       153        99
VIS    2025250     91400   17.1900 -112.7500      12.0        33       156        98
VIS    2025250     91400   17.2000 -112.7700      12.3        56       151        94
VIS    2025250     91400   17.1900 -112.7800      12.0        58       152        97
VIS    2025250     91400   17.1900 -112.8300      13.8        48       155       100
VIS    2025250     91400   17.2000 -112.8400      13.6        47       153       100
VIS    2025250     91400   17.2000 -112.9700      11.4        15       153        94
VIS    2025250     91400   17.2000 -113.0000      11.9        24       152       100
VIS    2025250     91400   17.1900 -113.0300      12.7        29       153       100
VIS    2025250     91400   17.1900 -113.0400      12.9        29       153       100
VIS    2025250     91400   17.1900 -113.0900      12.7        24       155        99
VIS    2025250     91400   17.1800 -113.1000      13.4        20       155        99
VIS    2025250     91400   17.1900 -113.1500      14.0        24       156        95
VIS    2025250     91400   17.2000 -113.1600      12.7        23       154        91
VIS    2025250     91400   17.1900 -113.2400      11.8        39       155       100
VIS    2025250     91400   17.1700 -113.2900      10.7        41       160        94
VIS    2025250     91400   17.1900 -113.3000      10.2        42       160        97
VIS    2025250     91400   17.1700 -113.3300      10.3        35       161       100
VIS    2025250     91400   17.1800 -113.5800       8.6         2       161        91
VIS    2025250     91400   17.1800 -113.6300       8.6        19       159        94
VIS    2025250     91400   17.1800 -113.7700      11.8        11       161       100
VIS    2025250     91400   17.1700 -113.9900      10.7         8       167        95
VIS    2025250     91400   17.1600 -114.0300      11.9        14       165        97
VIS    2025250     91400   17.1600 -114.0700       9.7       355       176        96
VIS    2025250     91400   17.1500 -114.1300       7.8       348       178       100
VIS    2025250     91400   17.1700 -114.1500       7.7       350       178       100
VIS    2025250     91400   17.1700 -114.3200       4.9        34       169        91
VIS    2025250     91400   17.1600 -114.4000       7.6        22       171        96
VIS    2025250     91400   17.1600 -114.4100       7.9        20       176        95
VIS    2025250     91400   17.1500 -114.4300       7.7        19       178        93
VIS    2025250     91400   17.1400 -114.4700       7.1       355       181       100
VIS    2025250     91400   17.1600 -114.4900       5.3       353       178        99
VIS    2025250     91400   17.1600 -114.5300       4.5       351       178        97
VIS    2025250     91400   17.1600 -114.5500       4.4       352       179        97
VIS    2025250     91400   17.1500 -114.5900       4.5       360       189        99
VIS    2025250     91400   17.1300 -115.4800       8.3       200       169        90
VIS    2025250     91400   17.1300 -115.5400       9.8       193       171        94
VIS    2025250     91400   17.1300 -115.5500      10.2       192       171        99
VIS    2025250     91400   17.0900 -116.7800       4.2        24       184        99
VIS    2025250     91400   17.0800 -116.8000       4.5        19       185        94
VIS    2025250     91400   17.0700 -118.2500       6.8        16       179        96
VIS    2025250     91400   17.0500 -118.3000       8.3       360       183       100
VIS    2025250     91400   17.0500 -118.3100       8.4       359       184       100
VIS    2025250     91400   17.2800 -108.7600       9.0       102       170        95
VIS    2025250     91400   17.2200 -110.8400      10.3        45       165        98
VIS    2025250     91400   17.2400 -110.8900       6.3        74       164        99
VIS    2025250     91400   17.2300 -110.9700       5.1        63       161        93
VIS    2025250     91400   17.2300 -110.9800       5.3        69       161        95
VIS    2025250     91400   17.2100 -111.0100       6.7        81       157        98
VIS    2025250     91400   17.2100 -111.0400       8.9        85       157        96
VIS    2025250     91400   17.2200 -111.1400       8.7        78       153        97
VIS    2025250     91400   17.2200 -111.1600       9.0        74       153        92
VIS    2025250     91400   17.2300 -111.2900       9.2        64       153        92
VIS    2025250     91400   17.2300 -111.3100       8.8        65       153        91
VIS    2025250     91400   17.2100 -111.3700      15.2        53       132        96
VIS    2025250     91400   17.2100 -111.3900      15.6        54       130        90
VIS    2025250     91400   17.2100 -111.4400      16.2        57       124        98
VIS    2025250     91400   17.2100 -111.4500      16.6        55       124        99
VIS    2025250     91400   17.2000 -111.4800      16.5        52       122        96
VIS    2025250     91400   17.2000 -111.5700      14.9        50       116       100
VIS    2025250     91400   17.2200 -111.6100      15.5        50       116        98
VIS    2025250     91400   17.1900 -111.6900      15.6        40       114       100
VIS    2025250     91400   17.2100 -111.7300      11.7        48       120        99
VIS    2025250     91400   17.2100 -111.7500      11.2        48       120       100
VIS    2025250     91400   17.2000 -111.7700      11.8        44       124        99
VIS    2025250     91400   17.1900 -111.8000      12.3        35       124       100
VIS    2025250     91400   17.2100 -111.8500      11.9        37       115        99
VIS    2025250     91400   17.2100 -111.8600      12.0        35       115       100
VIS    2025250     91400   17.1900 -111.8900      12.3        31       121       100
VIS    2025250     91400   17.2000 -111.9300      11.8        28       125        99
VIS    2025250     91400   17.2100 -112.0000       9.9        36       132        95
VIS    2025250     91400   17.1800 -112.0500       9.8        36       135        98
VIS    2025250     91400   17.1800 -112.0700       9.8        37       135        98
VIS    2025250     91400   17.1800 -112.2000       9.6        18       143        98
VIS    2025250     91400   17.1900 -112.3100       8.5        43       136        92
VIS    2025250     91400   17.2000 -112.3500      14.0        52       135       100
VIS    2025250     91400   17.1700 -112.4200      13.3        29       142        98
VIS    2025250     91400   17.1700 -112.5500      12.4        25       140       100
VIS    2025250     91400   17.1900 -112.6700      14.9        22       153        98
VIS    2025250     91400   17.1700 -112.7500      12.2        35       158        99
VIS    2025250     91400   17.1800 -112.7700      11.2        37       156        97
VIS    2025250     91400   17.1800 -112.8300      13.8        44       155        96
VIS    2025250     91400   17.1700 -112.9700       9.9        17       158        90
VIS    2025250     91400   17.1800 -113.0100      11.6        26       154        99
VIS    2025250     91400   17.1700 -113.0200      11.6        29       155       100
VIS    2025250     91400   17.1800 -113.0500      12.8        31       155       100
VIS    2025250     91400   17.1700 -113.0700      13.2        28       156       100
VIS    2025250     91400   17.1600 -113.1200      14.1        11       157        95
VIS    2025250     91400   17.1500 -113.2300      11.6        36       155       100
VIS    2025250     91400   17.1500 -113.2500      11.6        37       155        99
VIS    2025250     91400   17.1700 -113.2900      10.8        40       160        93
VIS    2025250     91400   17.1600 -113.3100      10.7        38       161        96
VIS    2025250     91400   17.1500 -113.3600       9.8        29       161        99
VIS    2025250     91400   17.1500 -113.6100      10.9        21       157        93
VIS    2025250     91400   17.1300 -113.8800       7.8        37       171        98
VIS    2025250     91400   17.1300 -114.1100       8.9       340       178        91
VIS    2025250     91400   17.1500 -114.1200       8.3       346       178       100
VIS    2025250     91400   17.1400 -114.4800       7.4       358       181       100
VIS    2025250     91400   17.1200 -114.4900       7.1       354       182       100
VIS    2025250     91400   17.1100 -115.5500      11.1       190       171        99
VIS    2025250     91400   17.0900 -115.9700       7.3        23       189        94
VIS    2025250     91400   17.0900 -116.0200       5.9        22       183        90
VIS    2025250     91400   17.0800 -116.7800       4.5        22       184        96
VIS    2025250     91400   17.0600 -116.8000       4.9        18       185        98
VIS    2025250     91400   17.0400 -118.3000       8.5       359       183       100
VIS    2025250     91400   17.0400 -118.3100       8.5       358       183       100
VIS    2025250     91400   17.2600 -108.7400       9.4        95       167       100
VIS    2025250     91400   17.2700 -108.7600       9.2       102       169        98
VIS    2025250     91400   17.2800 -108.7800       9.6        98       171       100
VIS    2025250     91400   17.2100 -110.1600      10.9        55       170        97
VIS    2025250     91400   17.2100 -110.2000      10.2        55       171       100
VIS    2025250     91400   17.2200 -110.2100      10.3        59       176       100
VIS    2025250     91400   17.2100 -110.7000       4.8        34       164        96
VIS    2025250     91400   17.2000 -110.8200       7.8        54       168        94
VIS    2025250     91400   17.1900 -110.8400       8.7        58       168        98
VIS    2025250     91400   17.2000 -110.9700       4.8        54       162        98
VIS    2025250     91400   17.2100 -110.9900       5.6        69       158        94
VIS    2025250     91400   17.1900 -111.0300       7.7        82       156        90
VIS    2025250     91400   17.2100 -111.0300       8.8        84       157        94
VIS    2025250     91400   17.1900 -111.0900      11.3        72       156       100
VIS    2025250     91400   17.1900 -111.1000       7.4        86       155        96
VIS    2025250     91400   17.1900 -111.1400       8.7        81       154        95
VIS    2025250     91400   17.1800 -111.1800       7.1        86       152       100
VIS    2025250     91400   17.1800 -111.3300      12.8        46       146        94
VIS    2025250     91400   17.2000 -111.3700      14.5        50       133        98
VIS    2025250     91400   17.2000 -111.4100      16.3        54       130        93
VIS    2025250     91400   17.1900 -111.4400      16.9        55       127       100
VIS    2025250     91400   17.2000 -111.4600      17.5        54       123       100
VIS    2025250     91400   17.2000 -111.4800      17.1        52       122        98
VIS    2025250     91400   17.1800 -111.5800      16.2        51       117        93
VIS    2025250     91400   17.1700 -111.6200      15.6        47       116        99
VIS    2025250     91400   17.1800 -111.6300      15.0        46       116       100
VIS    2025250     91400   17.1800 -111.6700      15.6        40       116        99
VIS    2025250     91400   17.1900 -111.6800      15.1        40       116        99
VIS    2025250     91400   17.1900 -111.7400      13.1        47       124        99
VIS    2025250     91400   17.1700 -111.7500      13.5        46       125        99
VIS    2025250     91400   17.1900 -111.7900      12.1        37       124        99
VIS    2025250     91400   17.1800 -111.8000      12.3        35       124       100
VIS    2025250     91400   17.1800 -111.8300      12.0        34       122       100
VIS    2025250     91400   17.1700 -111.8800      11.8        31       121       100
VIS    2025250     91400   17.1700 -111.9100      12.7        28       125       100
VIS    2025250     91400   17.1800 -111.9200      12.4        27       124       100
VIS    2025250     91400   17.1700 -111.9700      12.5        25       127       100
VIS    2025250     91400   17.1800 -112.0500       9.7        36       135        97
VIS    2025250     91400   17.1800 -112.0700       9.8        38       135        98
VIS    2025250     91400   17.1600 -112.1100      11.1        28       140        93
VIS    2025250     91400   17.1600 -112.1200       9.9        20       139        95
VIS    2025250     91400   17.1700 -112.2000      10.5        14       143        99
VIS    2025250     91400   17.1600 -112.2200       8.9        23       143        97
VIS    2025250     91400   17.1500 -112.3100      11.2        28       139        98
VIS    2025250     91400   17.1700 -112.3500      16.0        42       138        95
VIS    2025250     91400   17.1600 -112.3900      16.0        40       140        99
VIS    2025250     91400   17.1700 -112.4200      13.2        30       142       100
VIS    2025250     91400   17.1500 -112.4400      12.9        32       143        97
VIS    2025250     91400   17.1600 -112.5500      12.2        20       141        99
VIS    2025250     91400   17.1500 -112.6000      13.3        30       143        99
VIS    2025250     91400   17.1400 -112.6200      13.2        31       146        99
VIS    2025250     91400   17.1500 -112.7400      12.8        40       156        92
VIS    2025250     91400   17.1600 -112.7700      11.5        37       156        99
VIS    2025250     91400   17.1500 -112.8100      11.0        35       156        99
VIS    2025250     91400   17.1500 -112.8600      14.9        22       157        91
VIS    2025250     91400   17.1400 -112.9900       9.2        26       158        99
VIS    2025250     91400   17.1500 -112.9900       9.6        23       158       100
VIS    2025250     91400   17.1500 -113.0200      10.7        34       156        98
VIS    2025250     91400   17.1500 -113.0700      12.7        31       156       100
VIS    2025250     91400   17.1500 -113.0800      12.8        29       156       100
VIS    2025250     91400   17.1500 -113.1200      12.3        17       156        95
VIS    2025250     91400   17.1500 -113.1900      12.3        35       153       100
VIS    2025250     91400   17.1500 -113.2400      11.7        36       155       100
VIS    2025250     91400   17.1400 -113.2500      11.7        35       158        98
VIS    2025250     91400   17.1400 -113.4100       9.8        34       161       100
VIS    2025250     91400   17.1200 -113.4300      10.3        29       161        95
VIS    2025250     91400   17.1300 -113.4900      10.9        38       164        94
VIS    2025250     91400   17.1200 -113.6200       9.8        21       157        99
VIS    2025250     91400   17.1100 -113.8800       9.3        31       171        96
VIS    2025250     91400   17.1100 -113.9200       8.6        18       170       100
VIS    2025250     91400   17.1100 -113.9300       8.3        16       171        97
VIS    2025250     91400   17.1100 -113.9600       9.3        19       171        99
VIS    2025250     91400   17.1100 -114.1000       8.3       320       178       100
VIS    2025250     91400   17.1000 -114.4300       7.9        15       176       100
VIS    2025250     91400   17.0900 -114.5700       5.7        19       185        99
VIS    2025250     91400   17.0800 -115.4900       8.1       195       168        95
VIS    2025250     91400   17.0800 -115.5100       9.0       196       169        99
VIS    2025250     91400   17.0500 -116.7600       4.6         5       184        99
VIS    2025250     91400   17.0500 -116.7700       4.6         2       184       100
VIS    2025250     91400   17.0100 -117.8500      17.8        50       180        93
VIS    2025250     91400   17.2300 -108.7200       9.1        93       168       100
VIS    2025250     91400   17.2500 -108.7400       9.4        95       167       100
VIS    2025250     91400   17.2300 -108.7500       9.4        97       166       100
VIS    2025250     91400   17.2500 -108.7900       9.4       100       169       100
VIS    2025250     91400   17.2000 -110.1700      10.5        49       171       100
VIS    2025250     91400   17.2000 -110.2000      10.3        53       171       100
VIS    2025250     91400   17.1900 -110.2300      10.7        61       176        98
VIS    2025250     91400   17.2000 -110.2600      10.0        62       179        99
VIS    2025250     91400   17.1900 -110.2700      10.3        63       179        98
VIS    2025250     91400   17.2100 -110.3000      11.7        71       177        92
VIS    2025250     91400   17.2000 -110.3300      11.8        71       177        98
VIS    2025250     91400   17.1800 -110.7100       5.1        41       166        91
VIS    2025250     91400   17.1800 -110.8200       7.9        61       170        97
VIS    2025250     91400   17.1900 -110.8300       8.0        63       168        96
VIS    2025250     91400   17.1800 -110.9600       4.5        49       163        98
VIS    2025250     91400   17.1900 -110.9900       5.1        57       161        97
VIS    2025250     91400   17.1700 -111.0600       7.7        83       156        98
VIS    2025250     91400   17.1600 -111.1000       7.4        83       156        91
VIS    2025250     91400   17.1800 -111.1200       7.4        86       155        99
VIS    2025250     91400   17.1700 -111.1400       9.2        79       154       100
VIS    2025250     91400   17.1800 -111.1800       5.8       100       152        97
VIS    2025250     91400   17.1700 -111.1900       6.0        95       152        96
VIS    2025250     91400   17.1800 -111.2200       4.8       104       152        95
VIS    2025250     91400   17.1500 -111.3700      11.0        51       146        98
VIS    2025250     91400   17.1500 -111.4200      10.3        42       146        99
VIS    2025250     91400   17.1700 -111.4600      15.8        50       132        99
VIS    2025250     91400   17.1700 -111.5100      18.0        54       127        98
VIS    2025250     91400   17.1700 -111.6100      15.9        48       116        97
VIS    2025250     91400   17.1500 -111.6400      15.2        46       116        97
VIS    2025250     91400   17.1700 -111.6600      15.5        41       116        99
VIS    2025250     91400   17.1600 -111.7100      15.5        44       126       100
VIS    2025250     91400   17.1400 -111.7400      14.3        48       126       100
VIS    2025250     91400   17.1600 -111.7500      13.5        45       125        99
VIS    2025250     91400   17.1400 -111.8000      11.7        39       124        99
VIS    2025250     91400   17.1500 -111.8100      11.8        36       124       100
VIS    2025250     91400   17.1600 -111.8500      11.8        35       122       100
VIS    2025250     91400   17.1500 -111.8900      12.6        34       124        98
VIS    2025250     91400   17.1600 -111.9000      12.8        30       126        99
VIS    2025250     91400   17.1400 -111.9500      12.2        30       127       100
VIS    2025250     91400   17.1600 -111.9600      12.4        27       127       100
VIS    2025250     91400   17.1600 -111.9800      12.6        27       130       100
VIS    2025250     91400   17.1300 -112.1100      11.5        34       142       100
VIS    2025250     91400   17.1500 -112.1300      11.7        27       139        91
VIS    2025250     91400   17.1300 -112.2500      12.6        24       142        99
VIS    2025250     91400   17.1500 -112.3100      11.5        28       139        98
VIS    2025250     91400   17.1300 -112.3600      15.8        34       140        99
VIS    2025250     91400   17.1300 -112.3700      16.0        34       140        99
VIS    2025250     91400   17.1500 -112.3900      16.9        38       140       100
VIS    2025250     91400   17.1300 -112.4800      12.1        25       144       100
VIS    2025250     91400   17.1400 -112.5400      12.0        20       144        95
VIS    2025250     91400   17.1400 -112.6100      13.1        29       146        97
VIS    2025250     91400   17.1300 -112.6300      14.3        26       146        91
VIS    2025250     91400   17.1200 -112.6600      12.1        49       148        91
VIS    2025250     91400   17.1200 -112.7900      12.4        34       156        99
VIS    2025250     91400   17.1100 -112.8000      12.8        32       156       100
VIS    2025250     91400   17.1300 -112.9400      14.1        38       157        94
VIS    2025250     91400   17.1200 -112.9800       9.0        28       158       100
VIS    2025250     91400   17.1300 -113.0000       9.1        28       158       100
VIS    2025250     91400   17.1200 -113.0400      10.4        43       158        99
VIS    2025250     91400   17.1200 -113.1600      13.6        24       155        99
VIS    2025250     91400   17.1100 -113.1700      13.2        29       153        99
VIS    2025250     91400   17.1200 -113.2200      12.0        34       153        99
VIS    2025250     91400   17.1100 -113.2400      11.9        32       155       100
VIS    2025250     91400   17.1200 -113.2700      11.6        32       158        99
VIS    2025250     91400   17.1100 -113.2900      11.6        30       158       100
VIS    2025250     91400   17.1200 -113.4200       9.9        28       161        98
VIS    2025250     91400   17.1100 -113.4400      10.6        30       161        98
VIS    2025250     91400   17.1200 -113.4700      11.5        35       161        91
VIS    2025250     91400   17.1200 -113.4800      11.5        35       161        93
VIS    2025250     91400   17.1100 -113.5100      11.0        35       164        99
VIS    2025250     91400   17.0900 -113.5600       8.7        24       162        95
VIS    2025250     91400   17.1000 -113.5800       8.1        24       162        96
VIS    2025250     91400   17.0900 -113.6000       8.6        20       158        98
VIS    2025250     91400   17.0900 -113.8100      23.7        28       161        92
VIS    2025250     91400   17.1000 -113.8700       9.9        27       170        95
VIS    2025250     91400   17.0800 -113.9000      11.0        21       170        96
VIS    2025250     91400   17.1000 -113.9300       8.5        15       170        99
VIS    2025250     91400   17.1000 -113.9400       8.4        15       171        99
VIS    2025250     91400   17.0900 -114.0900       8.6        10       181        99
VIS    2025250     91400   17.0700 -114.3100       6.4        28       172        92
VIS    2025250     91400   17.0900 -114.4300       8.7        16       176        93
VIS    2025250     91400   17.0700 -114.4600       8.2        13       178        93
VIS    2025250     91400   17.0700 -114.5100      10.4        38       186        95
VIS    2025250     91400   17.0700 -114.5600       6.3        21       187        99
VIS    2025250     91400   17.0900 -114.6100       7.0         8       188        93
VIS    2025250     91400   17.0400 -115.4600       8.2       196       172        90
VIS    2025250     91400   17.0500 -115.4800       8.2       193       171        92
VIS    2025250     91400   17.0400 -115.6200       9.8        37       181        93
VIS    2025250     91400   17.0300 -116.2200       8.9        14       188        95
VIS    2025250     91400   17.0200 -116.7500       4.3       351       185       100
VIS    2025250     91400   17.0300 -116.7900       4.7       350       185        93
VIS    2025250     91400   17.0100 -117.8500      18.1        51       177        99
VIS    2025250     91400   17.0100 -117.8600      18.0        50       183       100
VIS    2025250     91400   16.9800 -118.2300      11.0       355       189        91
VIS    2025250     91400   16.9700 -118.9700       8.7        76       189        93
VIS    2025250     91400   16.9800 -118.9800       8.7        79       186        90
VIS    2025250     91400   16.9700 -119.5200      16.3        18       170        98
VIS    2025250     91400   17.2300 -108.7500       9.3        96       166       100
VIS    2025250     91400   17.2100 -108.7800       8.8       107       169       100
VIS    2025250     91400   17.2200 -108.7900       8.7       103       169        97
VIS    2025250     91400   17.1700 -110.1000      10.3        64       170        98
VIS    2025250     91400   17.1700 -110.1500      10.0        56       173       100
VIS    2025250     91400   17.1800 -110.1800      10.0        51       172        99
VIS    2025250     91400   17.1800 -110.1800       9.8        52       172        99
VIS    2025250     91400   17.1700 -110.2100      10.1        59       174        98
VIS    2025250     91400   17.1800 -110.2500      10.4        64       179        98
VIS    2025250     91400   17.1700 -110.3000      11.4        66       185        93
VIS    2025250     91400   17.1700 -110.3200      12.6        75       179        93
VIS    2025250     91400   17.1600 -110.6800       5.5        46       171        99
VIS    2025250     91400   17.1600 -110.6900       4.9        42       171        99
VIS    2025250     91400   17.1600 -110.8000       5.9        58       170        98
VIS    2025250     91400   17.1600 -110.8200       6.1        61       171        95
VIS    2025250     91400   17.1600 -110.9800       4.3        50       163        91
VIS    2025250     91400   17.1500 -111.0200       8.6        92       158        96
VIS    2025250     91400   17.1400 -111.0500       7.9        89       158        98
VIS    2025250     91400   17.1500 -111.1000       7.2        86       156        99
VIS    2025250     91400   17.1500 -111.1100       8.0        81       156       100
VIS    2025250     91400   17.1400 -111.1500       9.1        75       155        98
VIS    2025250     91400   17.1600 -111.1700       9.1        73       153       100
VIS    2025250     91400   17.1300 -111.3800      10.7        48       148        99
VIS    2025250     91400   17.1500 -111.4200      10.4        43       148       100
VIS    2025250     91400   17.1300 -111.4900       9.9        39       154        95
VIS    2025250     91400   17.1300 -111.6200      15.9        41       144       100
VIS    2025250     91400   17.1400 -111.6500      17.8        41       130       100
VIS    2025250     91400   17.1400 -111.6700      17.4        41       130        99
VIS    2025250     91400   17.1200 -111.7200      15.2        46       128       100
VIS    2025250     91400   17.1200 -111.7400      14.7        48       126        99
VIS    2025250     91400   17.1200 -111.7700      13.3        46       128        99
VIS    2025250     91400   17.1200 -111.7900      12.2        43       129        97
VIS    2025250     91400   17.1400 -111.8200      11.7        36       124        99
VIS    2025250     91400   17.1200 -111.8600      12.9        41       126        96
VIS    2025250     91400   17.1100 -111.8800      13.1        40       128        98
VIS    2025250     91400   17.1100 -111.9200      13.4        39       128       100
VIS    2025250     91400   17.1100 -111.9500      13.3        37       131        98
VIS    2025250     91400   17.1100 -111.9600      13.5        37       131        97
VIS    2025250     91400   17.1100 -112.0900      12.0        40       142        97
VIS    2025250     91400   17.1200 -112.1100      11.2        36       142        98
VIS    2025250     91400   17.1300 -112.1400      12.6        31       141       100
VIS    2025250     91400   17.1100 -112.1700      15.5        44       140        99
VIS    2025250     91400   17.1100 -112.2000      15.5        44       140        99
VIS    2025250     91400   17.1200 -112.2500      13.4        23       143       100
VIS    2025250     91400   17.1000 -112.3000      12.3        23       148        94
VIS    2025250     91400   17.1000 -112.3100      12.2        23       146        92
VIS    2025250     91400   17.1200 -112.3600      15.6        34       140        98
VIS    2025250     91400   17.1200 -112.3600      15.8        33       140        98
VIS    2025250     91400   17.1000 -112.4200      15.1        26       143        99
VIS    2025250     91400   17.1000 -112.5100      11.1        24       144        99
VIS    2025250     91400   17.1000 -112.5100      11.8        22       144        99
VIS    2025250     91400   17.1100 -112.6100      13.1        24       146        98
VIS    2025250     91400   17.0900 -112.6700      12.2        52       150        95
VIS    2025250     91400   17.1100 -112.6900      11.9        55       152        98
VIS    2025250     91400   17.1000 -112.7900      13.6        27       156        98
VIS    2025250     91400   17.1100 -112.8100      13.4        28       156        99
VIS    2025250     91400   17.0900 -112.8300      13.1        28       155        98
VIS    2025250     91400   17.0900 -112.8800      13.1        33       155        99
VIS    2025250     91400   17.1000 -112.9100      13.0        37       155        90
VIS    2025250     91400   17.0800 -113.0300      10.0        42       158        93
VIS    2025250     91400   17.0900 -113.1000      14.7        22       154        95
VIS    2025250     91400   17.0900 -113.1500      13.9        28       153        94
VIS    2025250     91400   17.0900 -113.1700      13.4        30       153        98
VIS    2025250     91400   17.0900 -113.2200      12.2        30       153       100
VIS    2025250     91400   17.0800 -113.2300      12.4        29       152        99
VIS    2025250     91400   17.0800 -113.2800      11.9        33       158        99
VIS    2025250     91400   17.0800 -113.2900      12.1        32       158        99
VIS    2025250     91400   17.0900 -113.3200      11.6        26       159        90
VIS    2025250     91400   17.0900 -113.3500      10.2        27       161        91
VIS    2025250     91400   17.0900 -113.4400      10.4        28       162        97
VIS    2025250     91400   17.0900 -113.4700      11.2        35       161        99
VIS    2025250     91400   17.0700 -113.5000      11.5        29       164        96
VIS    2025250     91400   17.0900 -113.5500       9.0        23       162       100
VIS    2025250     91400   17.0800 -113.5800       8.7        20       161        99
VIS    2025250     91400   17.0900 -113.6000       8.5        20       159        98
VIS    2025250     91400   17.0800 -113.6500      10.0        42       157       100
VIS    2025250     91400   17.0700 -113.6700      10.0        40       157       100
VIS    2025250     91400   17.0800 -113.9000      11.2        20       168        99
VIS    2025250     91400   17.0800 -113.9300      10.3        16       170       100
VIS    2025250     91400   17.0600 -113.9400      11.4        18       170        94
VIS    2025250     91400   17.0600 -114.0900       8.2         9       179        99
VIS    2025250     91400   17.0600 -114.1200       8.0         9       175       100
VIS    2025250     91400   17.0600 -114.3000      18.5        16       171        90
VIS    2025250     91400   17.0600 -114.4400       8.3        12       178        92
VIS    2025250     91400   17.0300 -115.5900       5.6        30       175        96
VIS    2025250     91400   17.0300 -115.6300       9.7        36       181        98
VIS    2025250     91400   17.0000 -116.1800       9.1        14       187        91
VIS    2025250     91400   17.0100 -116.2200       8.8        16       187        92
VIS    2025250     91400   16.9900 -116.7300       4.8       355       187        99
VIS    2025250     91400   17.0000 -116.7700       4.7       353       187       100
VIS    2025250     91400   17.0100 -116.7800       4.6       351       185       100
VIS    2025250     91400   16.9300 -119.5300      16.4        15       172        98
VIS    2025250     91400   17.1900 -108.7400       8.1       106       167       100
VIS    2025250     91400   17.1800 -108.7800       7.7       116       171       100
VIS    2025250     91400   17.1500 -110.1200      10.2        56       170       100
VIS    2025250     91400   17.1600 -110.1400       9.7        55       174       100
VIS    2025250     91400   17.1600 -110.1600       9.5        55       174       100
VIS    2025250     91400   17.1400 -110.2800      10.5        60       180       100
VIS    2025250     91400   17.1500 -110.6300      10.8        69       180        97
VIS    2025250     91400   17.1400 -110.8000       5.7        51       173        99
VIS    2025250     91400   17.1200 -110.8800       7.7        93       169        97
VIS    2025250     91400   17.1200 -110.9200       8.5        96       172        92
VIS    2025250     91400   17.1100 -111.0200       8.3        86       161        99
VIS    2025250     91400   17.1200 -111.0200       8.3        87       160        99
VIS    2025250     91400   17.1300 -111.0500       7.7        89       159        99
VIS    2025250     91400   17.1300 -111.0900       7.2        88       157        99
VIS    2025250     91400   17.1200 -111.1200       8.3        82       158       100
VIS    2025250     91400   17.1200 -111.1700       8.8        83       156        96
VIS    2025250     91400   17.1200 -111.1700       8.6        83       156        98
VIS    2025250     91400   17.1200 -111.3000      10.3        52       156        93
VIS    2025250     91400   17.1100 -111.3200       9.9        49       156        96
VIS    2025250     91400   17.1000 -111.4600       9.1        34       161        96
VIS    2025250     91400   17.1100 -111.4900       9.6        33       158        95
VIS    2025250     91400   17.1100 -111.5100       9.6        36       156        93
VIS    2025250     91400   17.1100 -111.5200      10.0        38       156        96
VIS    2025250     91400   17.1100 -111.6900      15.6        44       133        99
VIS    2025250     91400   17.0900 -111.7100      14.7        43       133       100
VIS    2025250     91400   17.0900 -111.7400      14.9        45       130       100
VIS    2025250     91400   17.1100 -111.7600      14.7        47       129       100
VIS    2025250     91400   17.0900 -111.7900      13.7        42       130        99
VIS    2025250     91400   17.1000 -111.8200      13.7        38       129        97
VIS    2025250     91400   17.0900 -111.8700      12.8        38       128        97
VIS    2025250     91400   17.0900 -111.8800      12.9        38       129        97
VIS    2025250     91400   17.1100 -111.9100      13.5        40       128        99
VIS    2025250     91400   17.1100 -111.9500      13.4        38       131        98
VIS    2025250     91400   17.0900 -111.9900      15.5        35       138        98
VIS    2025250     91400   17.0900 -111.9900      15.8        35       138        92
VIS    2025250     91400   17.0900 -112.0300      13.6        32       141        97
VIS    2025250     91400   17.1000 -112.1100      12.2        39       142        98
VIS    2025250     91400   17.0800 -112.1600      12.0        35       141       100
VIS    2025250     91400   17.0800 -112.2400       9.3        22       145       100
VIS    2025250     91400   17.0800 -112.2600       9.1        20       151        96
VIS    2025250     91400   17.1000 -112.3000      12.3        23       148        94
VIS    2025250     91400   17.0900 -112.3900      16.1        25       140       100
VIS    2025250     91400   17.0800 -112.4000      16.0        24       140       100
VIS    2025250     91400   17.0800 -112.4800      10.4        33       145        98
VIS    2025250     91400   17.0900 -112.5100      11.9        21       144        94
VIS    2025250     91400   17.0700 -112.5700      13.8        51       141       100
VIS    2025250     91400   17.0700 -112.6400      12.1        54       148        94
VIS    2025250     91400   17.0800 -112.6800      12.4        52       150        96
VIS    2025250     91400   17.0800 -112.8200      12.9        28       156        98
VIS    2025250     91400   17.0600 -112.8600      12.6        29       156       100
VIS    2025250     91400   17.0700 -112.9100      14.3        38       153        99
VIS    2025250     91400   17.0700 -112.9500      14.6        40       154        92
VIS    2025250     91400   17.0600 -112.9800      14.4        38       154        94
VIS    2025250     91400   17.0800 -113.0400      10.0        42       157        95
VIS    2025250     91400   17.0700 -113.0800      10.5        26       155        99
VIS    2025250     91400   17.0700 -113.0900      10.9        26       154        96
VIS    2025250     91400   17.0700 -113.1300      12.9        36       154        93
VIS    2025250     91400   17.0700 -113.1600      12.9        32       152       100
VIS    2025250     91400   17.0700 -113.1900      12.8        30       152       100
VIS    2025250     91400   17.0500 -113.2200      12.9        26       152       100
VIS    2025250     91400   17.0600 -113.2400      12.5        27       152        99
VIS    2025250     91400   17.0600 -113.2900      12.0        35       156        99
VIS    2025250     91400   17.0700 -113.3000      12.3        34       158       100
VIS    2025250     91400   17.0700 -113.4600      10.7        31       162        98
VIS    2025250     91400   17.0700 -113.4600      10.8        31       162        98
VIS    2025250     91400   17.0500 -113.5100      11.4        26       164        93
VIS    2025250     91400   17.0600 -113.5500       9.6        17       161        91
VIS    2025250     91400   17.0600 -113.5800       9.0        16       161        97
VIS    2025250     91400   17.0500 -113.6200       8.4        18       158       100
VIS    2025250     91400   17.0500 -113.6500       8.4        26       158        96
VIS    2025250     91400   17.0400 -113.7500       8.3        21       163        99
VIS    2025250     91400   17.0500 -113.8900      11.6        18       167        90
VIS    2025250     91400   17.0300 -114.1000       6.8         5       177        98
VIS    2025250     91400   17.0400 -114.1200       8.2        10       175        99
VIS    2025250     91400   17.0300 -114.2700       8.9        21       170       100
VIS    2025250     91400   17.0400 -114.2900       8.8        20       171       100
VIS    2025250     91400   17.0400 -114.3300       8.0        14       174        94
VIS    2025250     91400   17.0400 -114.4400       7.9        15       179        96
VIS    2025250     91400   16.9700 -116.7400       4.2       357       187        99
VIS    2025250     91400   16.9400 -118.2300       6.8        23       186        97
VIS    2025250     91400   16.9100 -118.8800       5.7       208       186        98
VIS    2025250     91400   16.9100 -119.5100      16.7        14       173       100
VIS    2025250     91400   17.1700 -108.7500       7.6       111       168        99
VIS    2025250     91400   17.1800 -108.7800       7.5       117       172       100
VIS    2025250     91400   17.1700 -108.8600       7.3       103       175        92
VIS    2025250     91400   17.1300 -110.1000      12.4        64       173        98
VIS    2025250     91400   17.1300 -110.1300      11.4        61       171        99
VIS    2025250     91400   17.1400 -110.1300      10.4        56       170       100
VIS    2025250     91400   17.1300 -110.2700       9.9        59       180        98
VIS    2025250     91400   17.1200 -110.2800       9.9        58       178       100
VIS    2025250     91400   17.1100 -110.3400      10.2        62       179        99
VIS    2025250     91400   17.1100 -110.4500       7.8        64       180        97
VIS    2025250     91400   17.1200 -110.4600       8.4        66       182       100
VIS    2025250     91400   17.1200 -110.7100       4.7        30       173       100
VIS    2025250     91400   17.1000 -110.9100       8.3        74       169        98
VIS    2025250     91400   17.1000 -111.0300       8.2        86       161        99
VIS    2025250     91400   17.1100 -111.0700       7.8        89       160        98
VIS    2025250     91400   17.1100 -111.0900       7.5        92       158        97
VIS    2025250     91400   17.1000 -111.1400       7.9        87       157       100
VIS    2025250     91400   17.1000 -111.1700       9.1        86       156        92
VIS    2025250     91400   17.1000 -111.1700       9.2        85       156        92
VIS    2025250     91400   17.0800 -111.2400      11.7        68       160        99
VIS    2025250     91400   17.1000 -111.3300       9.4        53       156        90
VIS    2025250     91400   17.1000 -111.3500       9.0        43       156       100
VIS    2025250     91400   17.1000 -111.4600       9.1        37       161       100
VIS    2025250     91400   17.0900 -111.4700      10.2        32       161       100
VIS    2025250     91400   17.1000 -111.5000       9.8        31       158        96
VIS    2025250     91400   17.0900 -111.6600      15.4        42       144        92
VIS    2025250     91400   17.0800 -111.7000      13.4        42       143        99
VIS    2025250     91400   17.0800 -111.7300      14.7        43       133       100
VIS    2025250     91400   17.0900 -111.7500      14.7        45       130       100
VIS    2025250     91400   17.0800 -111.7800      14.1        43       135       100
VIS    2025250     91400   17.0800 -111.8000      13.1        38       134       100
VIS    2025250     91400   17.0800 -111.8400      12.6        37       129        99
VIS    2025250     91400   17.0900 -111.8800      12.8        37       129        96
VIS    2025250     91400   17.0700 -111.9300      12.7        35       131       100
VIS    2025250     91400   17.0800 -111.9400      13.3        39       132        98
VIS    2025250     91400   17.0600 -111.9800      14.3        36       138       100
VIS    2025250     91400   17.0800 -112.0000      15.3        34       138       100
VIS    2025250     91400   17.0700 -112.0300      12.9        33       144        99
VIS    2025250     91400   17.0800 -112.0800      14.4        37       143        95
VIS    2025250     91400   17.0600 -112.0900      14.0        37       144        98
VIS    2025250     91400   17.0600 -112.1400      13.1        33       146        99
VIS    2025250     91400   17.0700 -112.1500      12.9        33       146       100
VIS    2025250     91400   17.0700 -112.2500       8.7        21       151        99
VIS    2025250     91400   17.0500 -112.2800       9.4        17       152        91
VIS    2025250     91400   17.0700 -112.2900      12.5        24       149        91
VIS    2025250     91400   17.0600 -112.4000      15.6        24       142        99
VIS    2025250     91400   17.0600 -112.4000      15.4        24       142        99
VIS    2025250     91400   17.0600 -112.5700      14.2        47       141        94
VIS    2025250     91400   17.0700 -112.5800      13.9        51       141        99
VIS    2025250     91400   17.0500 -112.6500      12.7        30       150        92
VIS    2025250     91400   17.0500 -112.8800      12.5        25       159        94
VIS    2025250     91400   17.0400 -112.9100      14.3        28       153       100
VIS    2025250     91400   17.0400 -112.9400      14.5        30       151       100
VIS    2025250     91400   17.0400 -112.9700      14.2        36       151        90
VIS    2025250     91400   17.0400 -113.0300      16.4        35       152        91
VIS    2025250     91400   17.0400 -113.0700       9.1        25       153       100
VIS    2025250     91400   17.0300 -113.1200      11.2        36       153        97
VIS    2025250     91400   17.0400 -113.1400      11.9        34       153        90
VIS    2025250     91400   17.0400 -113.1500      12.1        33       153        98
VIS    2025250     91400   17.0400 -113.1800      12.7        29       152       100
VIS    2025250     91400   17.0500 -113.2300      12.9        26       152        99
VIS    2025250     91400   17.0400 -113.2500      12.9        26       153        99
VIS    2025250     91400   17.0500 -113.2700      12.9        29       154        99
VIS    2025250     91400   17.0500 -113.3000      12.7        33       155        90
VIS    2025250     91400   17.0200 -113.3800      10.7        31       163        98
VIS    2025250     91400   17.0200 -113.4100      10.5        31       163       100
VIS    2025250     91400   17.0300 -113.4400       9.6        32       163        97
VIS    2025250     91400   17.0300 -113.4800      10.2        23       164        94
VIS    2025250     91400   17.0400 -113.5100      11.1        22       164        96
VIS    2025250     91400   17.0200 -113.5300      10.6        11       162        99
VIS    2025250     91400   17.0200 -113.5700      10.9         9       161        95
VIS    2025250     91400   17.0400 -113.5900       9.8        12       161        90
VIS    2025250     91400   17.0200 -113.7100       8.8        26       160        90
VIS    2025250     91400   17.0300 -113.7300       9.1        22       161        90
VIS    2025250     91400   17.0300 -113.7600      10.0        17       161        93
VIS    2025250     91400   17.0100 -114.0000       4.8       352       172        90
VIS    2025250     91400   17.0100 -114.0100       4.8       354       173        91
VIS    2025250     91400   17.0300 -114.0700       6.8        10       178        99
VIS    2025250     91400   17.0200 -114.1100       6.7         7       175        99
VIS    2025250     91400   17.0000 -114.1400       6.4         2       171        99
VIS    2025250     91400   17.0200 -114.1600       6.1         7       174        93
VIS    2025250     91400   17.0100 -114.2800       8.2        21       170        97
VIS    2025250     91400   17.0200 -114.3100      10.0        13       173       100
VIS    2025250     91400   17.0100 -114.3200      10.1        12       174        98
VIS    2025250     91400   17.0000 -114.4000       6.7       359       178        91
VIS    2025250     91400   16.9900 -115.6000       4.2       188       188       100
VIS    2025250     91400   16.9100 -118.8900       5.7       208       186        97
VIS    2025250     91400   16.8800 -119.5200      17.7        16       168        98
VIS    2025250     91400   16.8900 -119.5200      17.7        15       168        98
VIS    2025250     91400   17.1300 -108.7600       7.1       111       170        99
VIS    2025250     91400   17.1500 -108.7800       6.8       117       170        98
VIS    2025250     91400   17.1300 -108.8300       8.3       114       173        97
VIS    2025250     91400   17.1400 -108.8400       7.4       113       172        91
VIS    2025250     91400   17.1100 -110.1000      13.2        60       169        99
VIS    2025250     91400   17.1000 -110.1200      12.9        58       170        97
VIS    2025250     91400   17.0900 -110.1400      12.2        55       170        98
VIS    2025250     91400   17.1000 -110.2400       8.7        59       175        91
VIS    2025250     91400   17.0900 -110.2600       7.1        56       175        94
VIS    2025250     91400   17.1100 -110.3100       9.6        56       179        99
VIS    2025250     91400   17.1000 -110.3400      10.0        60       179        99
VIS    2025250     91400   17.1000 -110.3700      10.2        58       177        97
VIS    2025250     91400   17.0900 -110.4300       8.5        63       179        98
VIS    2025250     91400   17.0800 -110.4400       8.4        64       180        98
VIS    2025250     91400   17.0900 -110.4700       8.9        67       182        98
VIS    2025250     91400   17.0900 -110.5000       9.2        69       182        95
VIS    2025250     91400   17.0700 -110.8200      12.6        73       173        98
VIS    2025250     91400   17.0900 -110.9100       8.8        74       169        94
VIS    2025250     91400   17.0700 -110.9300       8.8        68       169        98
VIS    2025250     91400   17.0700 -110.9600       8.8        68       172       100
VIS    2025250     91400   17.0700 -111.0000       8.3        90       165       100
VIS    2025250     91400   17.0700 -111.0000       8.3        89       165       100
VIS    2025250     91400   17.0800 -111.1100       7.5       123       157        96
VIS    2025250     91400   17.0600 -111.2100      10.8        79       160        97
VIS    2025250     91400   17.0600 -111.2400      11.6        75       160        99
VIS    2025250     91400   17.0800 -111.3600       8.7        37       156        95
VIS    2025250     91400   17.0500 -111.5900       8.4        72       162        98
VIS    2025250     91400   17.0500 -111.6800       6.1        26       165        91
VIS    2025250     91400   17.0600 -111.7000      12.8        41       144        99
VIS    2025250     91400   17.0600 -111.7100      12.9        42       144        99
VIS    2025250     91400   17.0600 -111.7600      14.5        45       138       100
VIS    2025250     91400   17.0500 -111.7700      14.4        45       144       100
VIS    2025250     91400   17.0500 -111.8000      14.1        41       141       100
VIS    2025250     91400   17.0600 -111.8300      13.0        36       135       100
VIS    2025250     91400   17.0400 -111.9100      15.5        21       139        91
VIS    2025250     91400   17.0500 -111.9300      14.6        25       135        93
VIS    2025250     91400   17.0400 -111.9700      12.1        38       135        98
VIS    2025250     91400   17.0500 -111.9800      12.7        38       133        97
VIS    2025250     91400   17.0400 -112.0200      11.2        40       144       100
VIS    2025250     91400   17.0600 -112.0300      11.5        33       144        97
VIS    2025250     91400   17.0400 -112.0700      11.8        35       147       100
VIS    2025250     91400   17.0500 -112.1000      15.1        31       146        95
VIS    2025250     91400   17.0500 -112.1300      13.5        29       147        96
VIS    2025250     91400   17.0500 -112.1600      12.6        29       147       100
VIS    2025250     91400   17.0500 -112.1800      12.5        27       147       100
VIS    2025250     91400   17.0500 -112.2500       8.8        22       151        96
VIS    2025250     91400   17.0400 -112.4000      15.2        24       142        98
VIS    2025250     91400   17.0400 -112.4100      15.1        24       142        99
VIS    2025250     91400   17.0200 -112.6800      12.7        31       149        97
VIS    2025250     91400   17.0300 -112.7500       8.2        18       154        95
VIS    2025250     91400   17.0300 -112.7700       8.4        18       154        97
VIS    2025250     91400   17.0200 -112.8000       9.3        19       154        95
VIS    2025250     91400   17.0300 -112.8400      11.6        36       161        97
VIS    2025250     91400   17.0200 -112.8900      13.1        24       160        93
VIS    2025250     91400   17.0300 -112.9100      14.4        28       151       100
VIS    2025250     91400   17.0200 -112.9300      14.3        26       151       100
VIS    2025250     91400   17.0100 -112.9600      14.7        23       151        98
VIS    2025250     91400   17.0200 -113.0000      14.6        26       151        94
VIS    2025250     91400   17.0100 -113.0300      15.4        36       150        91
VIS    2025250     91400   17.0300 -113.1200      10.9        36       153        98
VIS    2025250     91400   17.0200 -113.1300      11.1        35       153        97
VIS    2025250     91400   17.0100 -113.1700      12.8        31       153        99
VIS    2025250     91400   17.0200 -113.2100      13.2        27       153        99
VIS    2025250     91400   17.0000 -113.2200      13.5        27       153        99
VIS    2025250     91400   17.0200 -113.2500      13.3        25       154        99
VIS    2025250     91400   17.0200 -113.2700      13.3        27       155        99
VIS    2025250     91400   17.0000 -113.3200      13.5        28       160        99
VIS    2025250     91400   17.0000 -113.3800      10.9        32       163       100
VIS    2025250     91400   17.0200 -113.4100      10.6        31       163       100
VIS    2025250     91400   17.0100 -113.4400       9.9        30       163        99
VIS    2025250     91400   17.0000 -113.4700      11.5        10       165        98
VIS    2025250     91400   17.0000 -113.4700      11.5        11       165        98
VIS    2025250     91400   17.0000 -113.5500      12.1         3       162        92
VIS    2025250     91400   16.9900 -113.6000      11.8        22       161       100
VIS    2025250     91400   17.0000 -113.6900       9.1        33       160        99
VIS    2025250     91400   16.9900 -113.7000       9.4        31       162       100
VIS    2025250     91400   17.0100 -113.7500      10.4        14       161        99
VIS    2025250     91400   17.0000 -113.7600      10.6        12       161       100
VIS    2025250     91400   17.0000 -113.7900      10.1        11       161       100
VIS    2025250     91400   17.0000 -114.0000       5.1       351       172        93
VIS    2025250     91400   17.0000 -114.0100       5.0       354       173        95
VIS    2025250     91400   16.9900 -114.0900       5.6       348       173        99
VIS    2025250     91400   16.9900 -114.1100       5.7       358       173        99
VIS    2025250     91400   17.0000 -114.1400       6.4         1       171        99
VIS    2025250     91400   16.9900 -114.1500       6.4       357       167        97
VIS    2025250     91400   16.9800 -114.2600       8.1        22       167        92
VIS    2025250     91400   16.9900 -114.2700       8.1        22       167        94
VIS    2025250     91400   16.9800 -114.3200       9.2        13       174        99
VIS    2025250     91400   16.9700 -114.3300       8.8        14       175        98
VIS    2025250     91400   16.9900 -114.3900       6.6         2       178        93
VIS    2025250     91400   16.9900 -114.4200       7.0       354       180        90
VIS    2025250     91400   16.9800 -114.5100       4.5        66       186        91
VIS    2025250     91400   16.9600 -115.1500       8.0        15       177        99
VIS    2025250     91400   16.9700 -115.1600       8.0        17       177        99
VIS    2025250     91400   16.8600 -119.5000      16.9        15       168        99
VIS    2025250     91400   16.8500 -119.5200      17.3        16       167       100
VIS    2025250     91400   17.1200 -108.7200       9.2        96       169        99
VIS    2025250     91400   17.1200 -108.7500       7.3       107       170       100
VIS    2025250     91400   17.1300 -108.8000       7.1       118       173        90
VIS    2025250     91400   17.1200 -108.8300       8.9       112       172        99
VIS    2025250     91400   17.1200 -108.8500       9.0       114       172        98
VIS    2025250     91400   17.1100 -108.8800      11.4        89       174        96
VIS    2025250     91400   17.1100 -108.9000      11.1        83       175        98
VIS    2025250     91400   17.0900 -110.1400      12.5        55       169        96
VIS    2025250     91400   17.0900 -110.1400      12.4        55       168        96
VIS    2025250     91400   17.0800 -110.3300      10.2        52       178        96
VIS    2025250     91400   17.0800 -110.4300       9.4        61       179        98
VIS    2025250     91400   17.0800 -110.4400       8.8        63       181        99
VIS    2025250     91400   17.0600 -110.5000       7.9        60       183       100
VIS    2025250     91400   17.0700 -110.7900      12.5        73       173        98
VIS    2025250     91400   17.0700 -110.8100      12.6        73       173        98
VIS    2025250     91400   17.0500 -110.9200       9.5        66       170        95
VIS    2025250     91400   17.0500 -110.9400       9.5        65       169        95
VIS    2025250     91400   17.0600 -110.9900       8.5        92       165       100
VIS    2025250     91400   17.0500 -111.2100      10.5        77       160        95
VIS    2025250     91400   17.0500 -111.2100      10.8        79       160        98
VIS    2025250     91400   17.0300 -111.5600       7.6        70       165       100
VIS    2025250     91400   17.0400 -111.5700       7.8        70       164       100
VIS    2025250     91400   17.0200 -111.6000       8.2        71       164        95
VIS    2025250     91400   17.0300 -111.6800       7.2        29       165        96
VIS    2025250     91400   17.0400 -111.7400      13.1        44       153        97
VIS    2025250     91400   17.0200 -111.8200       8.3        42       158        95
VIS    2025250     91400   17.0400 -111.8300      13.2        38       143        90
VIS    2025250     91400   17.0300 -111.9700      11.9        36       136        99
VIS    2025250     91400   17.0200 -112.0000      12.0        37       143       100
VIS    2025250     91400   17.0200 -112.0100      12.0        38       143       100
VIS    2025250     91400   17.0200 -112.0500      11.8        37       148       100
VIS    2025250     91400   17.0300 -112.0600      11.6        35       147       100
VIS    2025250     91400   17.0100 -112.1100      14.1        27       151        98
VIS    2025250     91400   17.0200 -112.1400      13.3        26       150        98
VIS    2025250     91400   17.0200 -112.1500      12.8        25       151        99
VIS    2025250     91400   17.0300 -112.2000      12.2        24       153       100
VIS    2025250     91400   17.0200 -112.2100      12.2        24       154       100
VIS    2025250     91400   17.0200 -112.3200       8.9       357       151       100
VIS    2025250     91400   17.0200 -112.3400       8.9         4       151       100
VIS    2025250     91400   17.0000 -112.3800       9.4        15       151       100
VIS    2025250     91400   17.0100 -112.3800       9.0        17       145        90
VIS    2025250     91400   17.0000 -112.4200      16.6        37       148        99
VIS    2025250     91400   17.0200 -112.4400      17.0        35       147        94
VIS    2025250     91400   17.0100 -112.5200      15.3        19       147        97
VIS    2025250     91400   17.0000 -112.6500      13.3        33       144        91
VIS    2025250     91400   17.0100 -112.6700      12.7        33       147        99
VIS    2025250     91400   17.0100 -112.8300      10.1        37       160        98
VIS    2025250     91400   16.9900 -112.8900      12.5        28       164        93
VIS    2025250     91400   17.0000 -112.9100      13.7        26       160       100
VIS    2025250     91400   17.0100 -112.9400      14.4        23       151       100
VIS    2025250     91400   17.0100 -112.9700      14.7        23       151        99
VIS    2025250     91400   17.0000 -113.0900       9.5        35       153        96
VIS    2025250     91400   16.9900 -113.1300      12.2        30       152       100
VIS    2025250     91400   16.9900 -113.1300      13.2        30       152        96
VIS    2025250     91400   16.9900 -113.1800      13.8        31       153        99
VIS    2025250     91400   16.9900 -113.2100      13.9        29       153       100
VIS    2025250     91400   17.0000 -113.2200      13.6        28       153       100
VIS    2025250     91400   16.9800 -113.2500      13.8        30       152       100
VIS    2025250     91400   16.9900 -113.2900      13.6        32       154        96
VIS    2025250     91400   17.0000 -113.3100      13.5        29       156        99
VIS    2025250     91400   16.9800 -113.3600      10.9        32       160        92
VIS    2025250     91400   16.9800 -113.3600      10.8        32       160        91
VIS    2025250     91400   16.9700 -113.4200       9.8        27       165        99
VIS    2025250     91400   16.9900 -113.4200      10.4        27       164        98
VIS    2025250     91400   16.9900 -113.4500      10.5        19       165        98
VIS    2025250     91400   16.9800 -113.4900      11.2         7       166        99
VIS    2025250     91400   16.9900 -113.5100       9.8        10       164        96
VIS    2025250     91400   16.9800 -113.5500       9.5        16       164       100
VIS    2025250     91400   16.9800 -113.5800      10.8        23       162        97
VIS    2025250     91400   16.9700 -113.6000      11.5        25       162        96
VIS    2025250     91400   16.9900 -113.6200      11.6        24       162        98
VIS    2025250     91400   16.9800 -113.6800      10.4        33       163        98
VIS    2025250     91400   16.9900 -113.7100       9.9        30       162       100
VIS    2025250     91400   16.9600 -113.7500      12.3        27       165        97
VIS    2025250     91400   16.9600 -113.7600      12.0        26       165        92
VIS    2025250     91400   16.9600 -114.1100       5.5       354       170        99
VIS    2025250     91400   16.9500 -114.1300       5.9       356       166        99
VIS    2025250     91400   16.9700 -114.1600       5.9       357       166        97
VIS    2025250     91400   16.9700 -114.2300       8.4        18       167       100
VIS    2025250     91400   16.9700 -114.2600       8.5        19       167        97
VIS    2025250     91400   16.9600 -114.2700       8.5        18       170       100
VIS    2025250     91400   16.9700 -114.3000       8.2        17       170        97
VIS    2025250     91400   16.9700 -114.3300       8.4        15       175        99
VIS    2025250     91400   16.9600 -114.4100       7.5       354       180        93
VIS    2025250     91400   16.9300 -115.1800      13.2        22       177        96
VIS    2025250     91400   16.9100 -116.0700       6.2         1       183        98
VIS    2025250     91400   16.9200 -116.0900       6.6         3       185        94
VIS    2025250     91400   16.8300 -119.4700      16.5        14       169        94
VIS    2025250     91400   16.8400 -119.4800      16.5        14       168        94
VIS    2025250     91400   16.8500 -119.5200      17.2        16       167       100
VIS    2025250     91400   16.8400 -119.5300      17.3        16       167       100
VIS    2025250     91400   17.0900 -108.7800       6.5       106       170        99
VIS    2025250     91400   17.0900 -108.7900       6.7       109       170       100
VIS    2025250     91400   17.0900 -108.8200       7.7       110       170       100
VIS    2025250     91400   17.1000 -108.8800      10.2        94       174        92
VIS    2025250     91400   17.0400 -110.3700       8.5        48       184        98
VIS    2025250     91400   17.0400 -110.4000       7.9        54       180        95
VIS    2025250     91400   17.0500 -110.4200       8.3        56       180        97
VIS    2025250     91400   17.0500 -110.4500       8.1        53       183        99
VIS    2025250     91400   17.0400 -110.5000       6.6        45       186        95
VIS    2025250     91400   17.0400 -110.5100       6.3        43       186        92
VIS    2025250     91400   17.0400 -110.8300      12.3        72       173        99
VIS    2025250     91400   17.0400 -111.0100       9.3        89       165        95
VIS    2025250     91400   17.0400 -111.0100       8.8        92       165       100
VIS    2025250     91400   17.0200 -111.1300       9.5        78       161        91
VIS    2025250     91400   17.0000 -111.4500       8.6        57       169        94
VIS    2025250     91400   17.0100 -111.5900       8.0        71       165        99
VIS    2025250     91400   17.0200 -111.6900       7.1        29       165        97
VIS    2025250     91400   16.9900 -111.7900       5.8        42       162        91
VIS    2025250     91400   17.0100 -111.8200       8.0        42       161        90
VIS    2025250     91400   17.0100 -111.8400       8.7        39       158       100
VIS    2025250     91400   16.9900 -111.9000      12.5        34       149        99
VIS    2025250     91400   17.0000 -111.9400      16.5        31       140        93
VIS    2025250     91400   17.0100 -111.9900      11.8        35       143       100
VIS    2025250     91400   17.0000 -112.0100      12.2        36       143       100
VIS    2025250     91400   17.0000 -112.0500      12.8        35       148       100
VIS    2025250     91400   17.0100 -112.0900      13.6        30       149       100
VIS    2025250     91400   16.9900 -112.1100      13.7        30       153       100
VIS    2025250     91400   16.9900 -112.1300      13.0        27       153       100
VIS    2025250     91400   16.9800 -112.1700      11.7        30       157        99
VIS    2025250     91400   16.9900 -112.2100      11.9        28       158        97
VIS    2025250     91400   16.9900 -112.2300      12.7        25       158        92
VIS    2025250     91400   16.9800 -112.3600      10.0        11       152        92
VIS    2025250     91400   16.9800 -112.3700      10.0        12       152        96
VIS    2025250     91400   16.9900 -112.4100      16.7        38       150        99
VIS    2025250     91400   17.0000 -112.4200      16.6        37       148        99
VIS    2025250     91400   16.9800 -112.5800      13.5        31       141        95
VIS    2025250     91400   16.9700 -112.6000      14.5        34       141        99
VIS    2025250     91400   16.9800 -112.6500      12.9        38       143        99
VIS    2025250     91400   16.9800 -112.9000      12.1        30       164        96
VIS    2025250     91400   16.9800 -112.9100      12.3        30       162        98
VIS    2025250     91400   16.9800 -112.9500      13.8        25       152       100
VIS    2025250     91400   16.9800 -112.9900      14.7        27       147        95
VIS    2025250     91400   16.9600 -113.0200      15.4        26       146        98
VIS    2025250     91400   16.9600 -113.0300      15.5        26       146        98
VIS    2025250     91400   16.9700 -113.0800      12.8        34       152       100
VIS    2025250     91400   16.9600 -113.1000      12.9        29       152       100
VIS    2025250     91400   16.9700 -113.1200      13.0        28       152       100
VIS    2025250     91400   16.9600 -113.1600      13.7        29       151        98
VIS    2025250     91400   16.9600 -113.1700      13.9        29       151        98
VIS    2025250     91400   16.9700 -113.2000      14.1        30       151        99
VIS    2025250     91400   16.9700 -113.2400      13.9        31       152       100
VIS    2025250     91400   16.9700 -113.2700      13.7        33       154        93
VIS    2025250     91400   16.9700 -113.3100      13.1        36       154        96
VIS    2025250     91400   16.9500 -113.4500      10.8        21       166        99
VIS    2025250     91400   16.9500 -113.4500      10.8        21       166        99
VIS    2025250     91400   16.9700 -113.4800      11.1        19       165        99
VIS    2025250     91400   16.9500 -113.5200      10.4        21       165        97
VIS    2025250     91400   16.9500 -113.5500      10.8        18       165        98
VIS    2025250     91400   16.9600 -113.5800      10.6        23       164        96
VIS    2025250     91400   16.9500 -113.6000      11.4        25       162        91
VIS    2025250     91400   16.9600 -113.6400      11.7        26       162        92
VIS    2025250     91400   16.9500 -113.6700      12.3        34       164        99
VIS    2025250     91400   16.9400 -113.6900      12.2        32       165       100
VIS    2025250     91400   16.9400 -113.7100      12.1        29       165        99
VIS    2025250     91400   16.9600 -113.7400      11.4        25       165        99
VIS    2025250     91400   16.9500 -113.7600      12.1        26       165        94
VIS    2025250     91400   16.9300 -113.9500      12.1         5       167        90
VIS    2025250     91400   16.9500 -114.1300       6.2       358       164        95
VIS    2025250     91400   16.9400 -114.1500       6.4         3       166       100
VIS    2025250     91400   16.9300 -114.1800       6.3        10       166        92
VIS    2025250     91400   16.9400 -114.2600       8.7        17       169        97
VIS    2025250     91400   16.9500 -114.2800       8.5        17       170        97
VIS    2025250     91400   16.9300 -114.4100       6.8       353       180        99
VIS    2025250     91400   16.9400 -114.4100       9.2       352       180       100
VIS    2025250     91400   16.9400 -114.4700       5.4        41       182        93
VIS    2025250     91400   16.9100 -115.1100       8.8        20       177        96
VIS    2025250     91400   16.9200 -115.1100       9.3        19       176        96
VIS    2025250     91400   16.9200 -115.1600      12.2        22       172       100
VIS    2025250     91400   16.9100 -115.1800      13.3        24       176        99
VIS    2025250     91400   16.8000 -119.4600      16.3        19       171        97
VIS    2025250     91400   16.8200 -119.5000      16.5        16       167        99
VIS    2025250     91400   16.8200 -119.5300      17.3        17       167       100
VIS    2025250     91400   16.8200 -119.5500      17.4        15       167        98
VIS    2025250     91400   17.0800 -108.8300       8.3       105       170        99
VIS    2025250     91400   17.0600 -108.8900       7.1        93       178        96
VIS    2025250     91400   17.0500 -108.9200       6.5        85       181       100
VIS    2025250     91400   17.0300 -110.3900       7.8        47       184        99
VIS    2025250     91400   17.0200 -110.3900       7.4        44       183        99
VIS    2025250     91400   17.0200 -110.4200       6.4        42       182        99
VIS    2025250     91400   17.0200 -110.4500       6.9        39       183        97
VIS    2025250     91400   17.0200 -110.5100       6.4        37       187        99
VIS    2025250     91400   17.0200 -110.5100       6.1        32       187        97
VIS    2025250     91400   17.0100 -110.6300       7.5        63       182        97
VIS    2025250     91400   17.0000 -110.6600       8.3        59       182       100
VIS    2025250     91400   17.0100 -110.7200       9.0        61       173        98
VIS    2025250     91400   17.0200 -110.7300       9.1        61       173        93
VIS    2025250     91400   16.9900 -110.9100      12.5        65       169        99
VIS    2025250     91400   17.0000 -110.9500      13.2        58       166        99
VIS    2025250     91400   16.9900 -110.9600      12.0        63       166        96
VIS    2025250     91400   17.0000 -111.0000      11.6        68       166        99
VIS    2025250     91400   17.0000 -111.0300      11.0        83       166        98
VIS    2025250     91400   16.9900 -111.1000      11.2        71       161        95
VIS    2025250     91400   16.9900 -111.1600       9.2        70       161        99
VIS    2025250     91400   17.0000 -111.1800       9.0        72       161       100
VIS    2025250     91400   16.9900 -111.2400       9.4        85       159        91
VIS    2025250     91400   17.0000 -111.3500       5.3        74       162        94
VIS    2025250     91400   17.0000 -111.4400       8.6        56       169        95
VIS    2025250     91400   16.9900 -111.6600      10.6        48       164        98
VIS    2025250     91400   16.9800 -111.7600       5.7        46       162        98
VIS    2025250     91400   16.9800 -111.8000       5.6        42       162        98
VIS    2025250     91400   16.9800 -111.8200       9.0        38       162        97
VIS    2025250     91400   16.9700 -111.8500      10.0        41       160        95
VIS    2025250     91400   16.9900 -111.8900      11.6        35       153       100
VIS    2025250     91400   16.9700 -111.9300      14.5        34       141        96
VIS    2025250     91400   16.9700 -111.9700      14.6        37       141        98
VIS    2025250     91400   16.9800 -112.0000      13.7        34       143       100
VIS    2025250     91400   16.9800 -112.0300      13.8        34       147       100
VIS    2025250     91400   16.9800 -112.0600      14.2        32       147        99
VIS    2025250     91400   16.9600 -112.0900      14.1        30       153        93
VIS    2025250     91400   16.9700 -112.2100      12.9        30       159        99
VIS    2025250     91400   16.9700 -112.4100      16.5        38       150       100
VIS    2025250     91400   16.9600 -112.4300      16.9        40       151        99
VIS    2025250     91400   16.9600 -112.4700      21.3        37       155        98
VIS    2025250     91400   16.9600 -112.5400      11.8        31       144       100
VIS    2025250     91400   16.9600 -112.5900      13.7        32       141       100
VIS    2025250     91400   16.9500 -112.6000      13.9        34       141       100
VIS    2025250     91400   16.9400 -112.6900      13.8        50       150       100
VIS    2025250     91400   16.9400 -112.8500      14.8        39       162        93
VIS    2025250     91400   16.9400 -112.8800      15.2        37       162       100
VIS    2025250     91400   16.9500 -112.9400      12.7        29       160       100
VIS    2025250     91400   16.9600 -112.9600      13.9        26       157       100
VIS    2025250     91400   16.9500 -112.9900      15.0        28       147       100
VIS    2025250     91400   16.9500 -113.0200      15.5        26       146        99
VIS    2025250     91400   16.9400 -113.0300      15.1        28       146       100
VIS    2025250     91400   16.9400 -113.0800      13.1        32       153        97
VIS    2025250     91400   16.9500 -113.1000      12.8        30       154       100
VIS    2025250     91400   16.9300 -113.1400      13.1        27       152       100
VIS    2025250     91400   16.9300 -113.1600      13.1        27       150        98
VIS    2025250     91400   16.9300 -113.1700      13.5        26       148        98
VIS    2025250     91400   16.9300 -113.2100      14.4        32       148        99
VIS    2025250     91400   16.9300 -113.2400      14.1        34       150        95
VIS    2025250     91400   16.9300 -113.2800       9.3        41       156        96
VIS    2025250     91400   16.9300 -113.3100      11.2        43       156        99
VIS    2025250     91400   16.9400 -113.3200      12.0        43       156        97
VIS    2025250     91400   16.9300 -113.4200      11.2        17       168       100
VIS    2025250     91400   16.9300 -113.4500      11.6        18       167        99
VIS    2025250     91400   16.9300 -113.4600      11.4        19       167        99
VIS    2025250     91400   16.9300 -113.5000      11.2        21       166        98
VIS    2025250     91400   16.9400 -113.5300      10.5        22       165        96
VIS    2025250     91400   16.9300 -113.5600      12.5        24       166        96
VIS    2025250     91400   16.9400 -113.5900      11.6        26       162        90
VIS    2025250     91400   16.9200 -113.6100      10.9        24       162        96
VIS    2025250     91400   16.9300 -113.6300      12.0        29       163        99
VIS    2025250     91400   16.9400 -113.6700      12.1        32       164       100
VIS    2025250     91400   16.9400 -113.7100      12.8        30       165        99
VIS    2025250     91400   16.9100 -113.7900       5.1        26       162        91
VIS    2025250     91400   16.9100 -113.8900       4.2       346       167        95
VIS    2025250     91400   16.9100 -113.9600      12.2         9       164       100
VIS    2025250     91400   16.9100 -114.1100       7.1         7       164        94
VIS    2025250     91400   16.9200 -114.1100       7.1         7       163        95
VIS    2025250     91400   16.9100 -114.1500       7.7        12       164       100
VIS    2025250     91400   16.9200 -114.1700       7.4        12       166        99
VIS    2025250     91400   16.9000 -114.2400       8.7        16       164       100
VIS    2025250     91400   16.9000 -114.2600       8.8        16       165       100
VIS    2025250     91400   16.9200 -114.4000       6.2       352       180        94
VIS    2025250     91400   16.8800 -115.1000       8.2        19       177       100
VIS    2025250     91400   16.8000 -119.4600      16.4        20       171        97
VIS    2025250     91400   16.7800 -119.5000      17.6        16       167        99
VIS    2025250     91400   16.7900 -119.5300      17.8        16       166       100
VIS    2025250     91400   16.7800 -119.5500      18.0        15       166       100
VIS    2025250     91400   17.0400 -108.8500       7.4        96       172        90
VIS    2025250     91400   17.0500 -108.9100       6.3        89       181        99
VIS    2025250     91400   17.0300 -108.9200       6.2       100       181        90
VIS    2025250     91400   17.0000 -110.4200       6.4        38       184        99
VIS    2025250     91400   16.9900 -110.4300       6.1        38       186        95
VIS    2025250     91400   16.9800 -110.4800       7.7        37       186        99
VIS    2025250     91400   16.9800 -110.5200       8.3        33       187       100
VIS    2025250     91400   16.9900 -110.5500       6.1        30       187        94
VIS    2025250     91400   16.9800 -110.6300       8.3        57       182        98
VIS    2025250     91400   16.9800 -110.6500       8.7        60       182       100
VIS    2025250     91400   16.9800 -110.7200       8.6        56       176        96
VIS    2025250     91400   16.9900 -110.7300       8.9        59       174        97
VIS    2025250     91400   16.9800 -110.7800       8.8        68       171        93
VIS    2025250     91400   16.9700 -110.8000       9.1        75       174        95
VIS    2025250     91400   16.9800 -110.8200       9.4        75       171        96
VIS    2025250     91400   16.9800 -110.9100      12.8        60       169        98
VIS    2025250     91400   16.9800 -110.9600      11.7        64       166        94
VIS    2025250     91400   16.9900 -110.9600      11.9        64       166        95
VIS    2025250     91400   16.9700 -111.0100      11.8        72       167        95
VIS    2025250     91400   16.9700 -111.0300      10.3        77       169       100
VIS    2025250     91400   16.9800 -111.0600      10.7        80       162        95
VIS    2025250     91400   16.9700 -111.1000      11.1        68       161        97
VIS    2025250     91400   16.9800 -111.1300      10.9        71       161        97
VIS    2025250     91400   16.9800 -111.1500      10.1        73       161        97
VIS    2025250     91400   16.9700 -111.1800       8.9        76       164        99
VIS    2025250     91400   16.9700 -111.2200       9.5        79       161        94
VIS    2025250     91400   16.9600 -111.2600       8.6        77       164        99
VIS    2025250     91400   16.9600 -111.2600       8.5        77       164        97
VIS    2025250     91400   16.9800 -111.2900       7.5        71       162        93
VIS    2025250     91400   16.9600 -111.3300       9.1        60       163        97
VIS    2025250     91400   16.9600 -111.4800       7.0        77       175        97
VIS    2025250     91400   16.9500 -111.6300       8.3        25       170        99
VIS    2025250     91400   16.9500 -111.7700       5.6        39       166        92
VIS    2025250     91400   16.9500 -111.8100       8.3        43       163        91
VIS    2025250     91400   16.9600 -111.8600      10.0        41       160        96
VIS    2025250     91400   16.9400 -111.9000      11.8        33       154        95
VIS    2025250     91400   16.9500 -111.9600      14.7        38       143       100
VIS    2025250     91400   16.9400 -112.0200      16.7        37       147        99
VIS    2025250     91400   16.9400 -112.0300      16.9        36       147        99
VIS    2025250     91400   16.9400 -112.0700      16.9        33       152        99
VIS    2025250     91400   16.9600 -112.0900      14.3        30       153        93
VIS    2025250     91400   16.9400 -112.1100      15.3        26       156        94
VIS    2025250     91400   16.9300 -112.3300       8.2        10       160       100
VIS    2025250     91400   16.9300 -112.4100      12.9        71       154        97
VIS    2025250     91400   16.9200 -112.5400      11.0         9       151        99
VIS    2025250     91400   16.9300 -112.5600      13.3        30       144       100
VIS    2025250     91400   16.9300 -112.5800      13.3        31       144       100
VIS    2025250     91400   16.9200 -112.6200      12.9        36       141        97
VIS    2025250     91400   16.9300 -112.6900      13.9        52       151        98
VIS    2025250     91400   16.9400 -112.7200      13.9        56       151        99
VIS    2025250     91400   16.9100 -112.8500      14.6        36       162       100
VIS    2025250     91400   16.9300 -112.8800      14.7        37       162       100
VIS    2025250     91400   16.9100 -112.9000      14.4        40       162       100
VIS    2025250     91400   16.9200 -112.9300      14.1        30       160       100
VIS    2025250     91400   16.9300 -112.9600      13.3        31       160        97
VIS    2025250     91400   16.9300 -112.9900      14.5        31       150        97
VIS    2025250     91400   16.9100 -113.0300      15.0        30       147       100
VIS    2025250     91400   16.9100 -113.0300      15.0        29       147       100
VIS    2025250     91400   16.9200 -113.0800      13.6        31       154        97
VIS    2025250     91400   16.9300 -113.0900      13.1        31       153        97
VIS    2025250     91400   16.9200 -113.1400      13.2        27       153       100
VIS    2025250     91400   16.9200 -113.1500      13.0        27       152       100
VIS    2025250     91400   16.9200 -113.1800      13.5        27       148       100
VIS    2025250     91400   16.9100 -113.2900       9.4        38       156        98
VIS    2025250     91400   16.9100 -113.3400      11.7        38       158       100
VIS    2025250     91400   16.9100 -113.3700      12.5        29       163        99
VIS    2025250     91400   16.9200 -113.3900      11.8        29       163        91
VIS    2025250     91400   16.9100 -113.4200      11.5        18       168        99
VIS    2025250     91400   16.9200 -113.4500      11.9        17       168        98
VIS    2025250     91400   16.9200 -113.4800      11.9        19       167        97
VIS    2025250     91400   16.9200 -113.5000      11.4        20       167        99
VIS    2025250     91400   16.9100 -113.5400      11.3        27       167       100
VIS    2025250     91400   16.9000 -113.5700      13.0        28       167       100
VIS    2025250     91400   16.9000 -113.5800      12.8        28       166       100
VIS    2025250     91400   16.8900 -113.6100      11.9        25       164        92
VIS    2025250     91400   16.9000 -113.6600      11.5        26       165       100
VIS    2025250     91400   16.9000 -113.6800      12.2        30       165       100
VIS    2025250     91400   16.8900 -113.7100       9.8        23       165        98
VIS    2025250     91400   16.9100 -113.7300       8.7        19       166        94
VIS    2025250     91400   16.9000 -113.7700       6.8        20       160       100
VIS    2025250     91400   16.9000 -113.7900       5.9        22       160       100
VIS    2025250     91400   16.8900 -113.8200       7.3        16       153        99
VIS    2025250     91400   16.9100 -113.8900       4.2       343       167        92
VIS    2025250     91400   16.8900 -113.9400       6.3       326       164       100
VIS    2025250     91400   16.8900 -113.9500       6.4       327       164       100
VIS    2025250     91400   16.8800 -114.0200       7.3        18       166        94
VIS    2025250     91400   16.8900 -114.1000       7.6         6       164        99
VIS    2025250     91400   16.8900 -114.1400       7.2        14       164        93
VIS    2025250     91400   16.8900 -114.1400       7.1        16       165        98
VIS    2025250     91400   16.8900 -114.1900      10.4       352       162       100
VIS    2025250     91400   16.8900 -114.2200       8.5        18       164       100
VIS    2025250     91400   16.9000 -114.2300       8.6        17       164        99
VIS    2025250     91400   16.9000 -114.2700       8.9        16       166       100
VIS    2025250     91400   16.8900 -114.3000       8.9        18       172        99
VIS    2025250     91400   16.8800 -114.3400       8.3        25       176        94
VIS    2025250     91400   16.8800 -114.3400       7.5        29       176        94
VIS    2025250     91400   16.8900 -114.4500      10.1        19       180        95
VIS    2025250     91400   16.8600 -115.0900       9.1        20       176        99
VIS    2025250     91400   16.8600 -115.1000       9.9        21       174        99
VIS    2025250     91400   16.8500 -115.1600      14.2        29       172       100
VIS    2025250     91400   16.8600 -115.2000      13.3        27       175        96
VIS    2025250     91400   16.8500 -115.4900      19.4        15       184        99
VIS    2025250     91400   16.7900 -117.9200      13.9        47       186        94
VIS    2025250     91400   16.7600 -119.4900      17.8        16       167        99
VIS    2025250     91400   16.7700 -119.5400      18.5        15       166       100
VIS    2025250     91400   17.0100 -108.7700       6.8        86       175       100
VIS    2025250     91400   17.0200 -108.8100       5.5        80       170        99
VIS    2025250     91400   17.0300 -108.8400       6.1        88       170        98
VIS    2025250     91400   16.9700 -110.4300       6.3        40       188       100
VIS    2025250     91400   16.9700 -110.4400       6.4        39       189       100
VIS    2025250     91400   16.9700 -110.4700       9.1        32       190        93
VIS    2025250     91400   16.9700 -110.5100       8.8        35       187        97
VIS    2025250     91400   16.9700 -110.5200       8.6        35       187        99
VIS    2025250     91400   16.9600 -110.5500       9.2        37       189        95
VIS    2025250     91400   16.9700 -110.6200       8.7        57       182        99
VIS    2025250     91400   16.9700 -110.6400       8.4        61       182       100
VIS    2025250     91400   16.9700 -110.6900      12.4        54       179        96
VIS    2025250     91400   16.9500 -110.8600       7.4        62       172        94
VIS    2025250     91400   16.9600 -110.9500       9.3        78       166        93
VIS    2025250     91400   16.9400 -111.0200       9.0        83       168        92
VIS    2025250     91400   16.9600 -111.0300      10.1        76       169       100
VIS    2025250     91400   16.9400 -111.0900       9.8        61       161        93
VIS    2025250     91400   16.9600 -111.1200      11.2        65       161        98
VIS    2025250     91400   16.9600 -111.2000       9.1        80       163       100
VIS    2025250     91400   16.9400 -111.2300       9.3        76       165       100
VIS    2025250     91400   16.9500 -111.2600       8.6        76       164        99
VIS    2025250     91400   16.9500 -111.2700       8.5        75       164        98
VIS    2025250     91400   16.9300 -111.4200       9.2        71       169        94
VIS    2025250     91400   16.9500 -111.4600       7.0        77       174        96
VIS    2025250     91400   16.9300 -111.4800       6.8        71       177       100
VIS    2025250     91400   16.9500 -111.5200       6.4        78       177        98
VIS    2025250     91400   16.9400 -111.6600       8.3        23       164        98
VIS    2025250     91400   16.9300 -111.7900       8.0        31       163        98
VIS    2025250     91400   16.9200 -111.8100       9.5        42       165        94
VIS    2025250     91400   16.9200 -111.8300       9.8        44       166        95
VIS    2025250     91400   16.9400 -111.8700      10.8        38       160        97
VIS    2025250     91400   16.9400 -111.9000      11.9        33       154        95
VIS    2025250     91400   16.9200 -111.9400      13.1        38       155       100
VIS    2025250     91400   16.9300 -111.9400      12.4        37       147        92
VIS    2025250     91400   16.9300 -111.9700      15.6        39       147       100
VIS    2025250     91400   16.9200 -112.0200      16.8        39       147        98
VIS    2025250     91400   16.9300 -112.0300      17.0        37       147        99
VIS    2025250     91400   16.9100 -112.0800      16.8        27       154       100
VIS    2025250     91400   16.9100 -112.0900      16.5        26       158       100
VIS    2025250     91400   16.9100 -112.1200      15.5        23       156       100
VIS    2025250     91400   16.9100 -112.1500      14.4        26       159       100
VIS    2025250     91400   16.9300 -112.1800      13.8        27       161        99
VIS    2025250     91400   16.9100 -112.2100      13.5        25       165        90
VIS    2025250     91400   16.9100 -112.6000      13.4        36       143        96
VIS    2025250     91400   16.9100 -112.6100      13.2        36       143        94
VIS    2025250     91400   16.9100 -112.6900      14.2        49       151        98
VIS    2025250     91400   16.9100 -112.6900      14.0        51       151       100
VIS    2025250     91400   16.9000 -112.7700      14.0        59       157        97
VIS    2025250     91400   16.8900 -112.8300      13.6        42       160       100
VIS    2025250     91400   16.9100 -112.8500      14.5        37       162       100
VIS    2025250     91400   16.9100 -112.8900      14.5        40       162       100
VIS    2025250     91400   16.9100 -112.9000      13.8        37       162        98
VIS    2025250     91400   16.8900 -112.9400      13.8        33       160        96
VIS    2025250     91400   16.9000 -113.0300      14.1        33       155        98
VIS    2025250     91400   16.9000 -113.0400      14.4        32       153        99
VIS    2025250     91400   16.8900 -113.0700      14.7        29       157       100
VIS    2025250     91400   16.8900 -113.1200      13.6        28       155       100
VIS    2025250     91400   16.8900 -113.1400      13.0        28       155       100
VIS    2025250     91400   16.9000 -113.1500      12.9        27       153       100
VIS    2025250     91400   16.8900 -113.1900      12.6        34       154        99
VIS    2025250     91400   16.8900 -113.2300      11.3        40       154        98
VIS    2025250     91400   16.8800 -113.3400      12.8        33       165       100
VIS    2025250     91400   16.8900 -113.3700      13.0        27       164       100
VIS    2025250     91400   16.8800 -113.3900      13.2        25       165       100
VIS    2025250     91400   16.8900 -113.4300      11.7        18       168       100
VIS    2025250     91400   16.8900 -113.4400      11.6        17       168        99
VIS    2025250     91400   16.8800 -113.4800      11.5        22       171        92
VIS    2025250     91400   16.8800 -113.5100      11.3        19       168        97
VIS    2025250     91400   16.8900 -113.5200      12.0        27       167        98
VIS    2025250     91400   16.8800 -113.5500      13.0        29       167       100
VIS    2025250     91400   16.8900 -113.6000      11.9        25       164        91
VIS    2025250     91400   16.8900 -113.6100      12.0        25       164        92
VIS    2025250     91400   16.8800 -113.6500      11.3        24       165       100
VIS    2025250     91400   16.8700 -113.6900      10.6        28       160        93
VIS    2025250     91400   16.8900 -113.7000      10.0        24       165        99
VIS    2025250     91400   16.8700 -113.7500       9.1        21       143       100
VIS    2025250     91400   16.8700 -113.7500       8.9        21       143       100
VIS    2025250     91400   16.8600 -113.8000       7.9        12       148       100
VIS    2025250     91400   16.8700 -113.8300       7.7        11       153       100
VIS    2025250     91400   16.8700 -113.8400       7.8        13       153       100
VIS    2025250     91400   16.8600 -113.9400       5.3       338       165        99
VIS    2025250     91400   16.8800 -113.9500       6.1       332       164        98
VIS    2025250     91400   16.8600 -114.0100      10.5         8       163        94
VIS    2025250     91400   16.8600 -114.0400       7.4        14       166        94
VIS    2025250     91400   16.8600 -114.0900       8.3         2       165        98
VIS    2025250     91400   16.8600 -114.0900       8.0         3       165       100
VIS    2025250     91400   16.8700 -114.1200       7.8         7       164       100
VIS    2025250     91400   16.8700 -114.1700      12.9        22       164        92
VIS    2025250     91400   16.8500 -114.1900       8.6        17       163       100
VIS    2025250     91400   16.8600 -114.2300       8.9        15       163       100
VIS    2025250     91400   16.8600 -114.2500       9.1        16       163       100
VIS    2025250     91400   16.8500 -114.2800       9.7        14       170        99
VIS    2025250     91400   16.8600 -114.2900       9.7        15       171        99
VIS    2025250     91400   16.8700 -114.3200       9.1        18       173        99
VIS    2025250     91400   16.8700 -114.3400       8.3        25       176        93
VIS    2025250     91400   16.8500 -114.4500      10.6        14       182        99
VIS    2025250     91400   16.8500 -114.4600      10.1        12       184        99
VIS    2025250     91400   16.8500 -114.4900      11.1        11       189        99
VIS    2025250     91400   16.8300 -115.0600      10.3        15       176        98
VIS    2025250     91400   16.8500 -115.0900       9.3        20       174        98
VIS    2025250     91400   16.8500 -115.1000       9.9        21       174       100
VIS    2025250     91400   16.8500 -115.1300      13.4        28       171       100
VIS    2025250     91400   16.8300 -115.1600      14.7        30       172       100
VIS    2025250     91400   16.8400 -115.2000      14.1        30       173        97
VIS    2025250     91400   16.8300 -115.4800      20.5        13       183        91
VIS    2025250     91400   16.8400 -115.4900      19.7        15       184        98
VIS    2025250     91400   17.0000 -108.7800       6.9        86       175       100
VIS    2025250     91400   16.9900 -108.8300       5.8        71       173        95
VIS    2025250     91400   17.0000 -108.8400       5.9        82       171       100
VIS    2025250     91400   16.9800 -108.8900       5.2        73       183        97
VIS    2025250     91400   16.9800 -108.9800       6.5       104       178        94
VIS    2025250     91400   17.0000 -108.9900       7.1        98       178        97
VIS    2025250     91400   16.9400 -110.4400       7.2        40       187        93
VIS    2025250     91400   16.9500 -110.4400       6.7        36       189        98
VIS    2025250     91400   16.9500 -110.5500       9.7        40       189        90
VIS    2025250     91400   16.9500 -110.5600       9.6        42       189        90
VIS    2025250     91400   16.9300 -110.6100       8.9        56       184        98
VIS    2025250     91400   16.9300 -110.6400       8.8        61       184       100
VIS    2025250     91400   16.9400 -110.6500       8.9        63       184        99
VIS    2025250     91400   16.9300 -110.6800       9.4        67       185       100
VIS    2025250     91400   16.9200 -110.8900       7.0        71       172        90
VIS    2025250     91400   16.9200 -110.9300       8.5        67       168       100
VIS    2025250     91400   16.9400 -110.9700       8.7        83       166        97
VIS    2025250     91400   16.9300 -110.9700       8.8        84       166        99
VIS    2025250     91400   16.9300 -111.0200       8.7        77       168        96
VIS    2025250     91400   16.9200 -111.1400       9.6        66       166        95
VIS    2025250     91400   16.9300 -111.1600       9.5        73       166        90
VIS    2025250     91400   16.9100 -111.2200       9.1        73       169        99
VIS    2025250     91400   16.9200 -111.2600       9.1        73       166        95
VIS    2025250     91400   16.9200 -111.2700       9.3        72       166        94
VIS    2025250     91400   16.9100 -111.4000       9.0        60       169        97
VIS    2025250     91400   16.9100 -111.4400       8.7        68       174        99
VIS    2025250     91400   16.9100 -111.4600       7.5        70       177        97
VIS    2025250     91400   16.9000 -111.5000       7.3        59       177       100
VIS    2025250     91400   16.9100 -111.5200       7.7        58       176       100
VIS    2025250     91400   16.9000 -111.5600       8.6        58       175        90
VIS    2025250     91400   16.9200 -111.5800       9.7        55       173        94
VIS    2025250     91400   16.9100 -111.7600       8.6        53       165        92
VIS    2025250     91400   16.8900 -111.7800       8.5        47       164       100
VIS    2025250     91400   16.9100 -111.8100       8.9        41       165       100
VIS    2025250     91400   16.8900 -111.8300       8.7        45       164       100
VIS    2025250     91400   16.9000 -111.8800      13.0        34       161       100
VIS    2025250     91400   16.9100 -111.9000      13.0        34       158       100
VIS    2025250     91400   16.9100 -111.9400      13.3        39       157       100
VIS    2025250     91400   16.8900 -111.9600      13.9        44       159       100
VIS    2025250     91400   16.8900 -111.9900      14.2        52       162       100
VIS    2025250     91400   16.8900 -112.0200      16.5        60       160        93
VIS    2025250     91400   16.9000 -112.0600      17.2        29       158       100
VIS    2025250     91400   16.8900 -112.0700      16.7        29       158       100
VIS    2025250     91400   16.8900 -112.1000      16.2        25       159       100
VIS    2025250     91400   16.8900 -112.1400      14.8        23       161       100
VIS    2025250     91400   16.8900 -112.1600      14.3        26       163       100
VIS    2025250     91400   16.8900 -112.1800      14.1        28       165       100
VIS    2025250     91400   16.9000 -112.2000      13.5        26       165        97
VIS    2025250     91400   16.8800 -112.5100      14.5        34       152       100
VIS    2025250     91400   16.8700 -112.5600      13.6        46       149        99
VIS    2025250     91400   16.8900 -112.5900      13.5        39       146        98
VIS    2025250     91400   16.8900 -112.6300      12.6        45       144        93
VIS    2025250     91400   16.8700 -112.6400      13.3        40       144        97
VIS    2025250     91400   16.8800 -112.7000      12.8        57       152        99
VIS    2025250     91400   16.8700 -112.7300      13.0        54       152       100
VIS    2025250     91400   16.8800 -112.8100      13.6        50       160        93
VIS    2025250     91400   16.8800 -112.8200      13.3        44       160       100
VIS    2025250     91400   16.8700 -112.8400      13.3        44       160       100
VIS    2025250     91400   16.8700 -112.8700      13.8        43       160        93
VIS    2025250     91400   16.8800 -112.9400      13.6        32       161        94
VIS    2025250     91400   16.8700 -112.9800      14.0        39       161       100
VIS    2025250     91400   16.8700 -113.0100      13.7        37       159       100
VIS    2025250     91400   16.8800 -113.0100      13.7        37       157        98
VIS    2025250     91400   16.8600 -113.0500      13.6        31       159       100
VIS    2025250     91400   16.8700 -113.0800      14.2        29       157        99
VIS    2025250     91400   16.8700 -113.1100      14.3        29       156        98
VIS    2025250     91400   16.8800 -113.1300      13.5        30       155        99
VIS    2025250     91400   16.8700 -113.1600      12.6        33       155        99
VIS    2025250     91400   16.8600 -113.1900      13.0        31       157       100
VIS    2025250     91400   16.8700 -113.2200      12.9        31       157        98
VIS    2025250     91400   16.8600 -113.2400      13.1        29       160        98
VIS    2025250     91400   16.8600 -113.2700      13.4        27       160        98
VIS    2025250     91400   16.8500 -113.3200      14.1        42       165        97
VIS    2025250     91400   16.8500 -113.3300      14.0        42       165        96
VIS    2025250     91400   16.8700 -113.3600      13.1        28       165       100
VIS    2025250     91400   16.8500 -113.4000      13.7        25       167        98
VIS    2025250     91400   16.8600 -113.4200      12.0        21       168       100
VIS    2025250     91400   16.8500 -113.4600      12.5        26       169        99
VIS    2025250     91400   16.8500 -113.4800      12.0        24       169        93
VIS    2025250     91400   16.8500 -113.5000      12.0        23       169        92
VIS    2025250     91400   16.8600 -113.6300      12.6        27       165       100
VIS    2025250     91400   16.8400 -113.6900      10.8        31       129        97
VIS    2025250     91400   16.8400 -113.7000      10.7        31       129        98
VIS    2025250     91400   16.8400 -113.7400      10.1        26       130        97
VIS    2025250     91400   16.8400 -113.7700       9.4        17       130       100
VIS    2025250     91400   16.8400 -113.8000       8.6        10       147       100
VIS    2025250     91400   16.8400 -113.8100       7.9         7       147        99
VIS    2025250     91400   16.8500 -113.8400       7.3         2       154        99
VIS    2025250     91400   16.8400 -113.8700       8.0       352       163        95
VIS    2025250     91400   16.8500 -113.9200       6.3       341       167        99
VIS    2025250     91400   16.8400 -113.9300       5.8       348       168        96
VIS    2025250     91400   16.8500 -113.9500       5.1       349       165        99
VIS    2025250     91400   16.8500 -114.0400       7.5        13       166        92
VIS    2025250     91400   16.8500 -114.0700       8.1         4       167        97
VIS    2025250     91400   16.8300 -114.1200       9.1       359       163        96
VIS    2025250     91400   16.8500 -114.1600      14.3         6       159       100
VIS    2025250     91400   16.8500 -114.2200       8.9        16       163       100
VIS    2025250     91400   16.8500 -114.2600       9.6        15       164       100
VIS    2025250     91400   16.8300 -114.2800      10.0        14       170        98
VIS    2025250     91400   16.8400 -114.2900      10.0        14       174        98
VIS    2025250     91400   16.8300 -114.3200      10.3        13       177        92
VIS    2025250     91400   16.8300 -114.3500      13.4         9       177        93
VIS    2025250     91400   16.8200 -114.4200      10.8         8       178       100
VIS    2025250     91400   16.8200 -114.4400      10.8        11       184       100
VIS    2025250     91400   16.8400 -114.4600      10.2        11       185        98
VIS    2025250     91400   16.8100 -115.0400      10.0        16       176       100
VIS    2025250     91400   16.8200 -115.0600       9.7        16       174        99
VIS    2025250     91400   16.8300 -115.0800       9.8        18       174        99
VIS    2025250     91400   16.8100 -115.1300      13.7        37       172        92
VIS    2025250     91400   16.8200 -115.1300      13.8        36       172        91
VIS    2025250     91400   16.8200 -115.1700      15.2        31       172       100
VIS    2025250     91400   16.8200 -115.1900      14.4        31       173        97
VIS    2025250     91400   16.7800 -116.0100      18.2       357       184        90
VIS    2025250     91400   16.7900 -116.0400      18.5       358       184        91
VIS    2025250     91400   16.9800 -108.8400       6.0        67       174        92
VIS    2025250     91400   16.9800 -108.8400       6.2        67       175        94
VIS    2025250     91400   16.9700 -108.8900       5.0        72       181        90
VIS    2025250     91400   16.9600 -109.0000       5.2       107       180        95
VIS    2025250     91400   16.9300 -110.4500       7.7        37       186        97
VIS    2025250     91400   16.9000 -110.5600       8.7        48       188        98
VIS    2025250     91400   16.9100 -110.5700       9.5        50       187        94
VIS    2025250     91400   16.9100 -110.6000       9.1        54       186        99
VIS    2025250     91400   16.9200 -110.6400       8.8        60       185       100
VIS    2025250     91400   16.9000 -110.6600       8.9        60       185       100
VIS    2025250     91400   16.9100 -110.7000       9.7        68       185       100
VIS    2025250     91400   16.9100 -110.7200      11.1        73       182        96
VIS    2025250     91400   16.9200 -110.8500       6.6        76       173        99
VIS    2025250     91400   16.9100 -110.8700       6.9        72       173        97
VIS    2025250     91400   16.9000 -110.8900       7.7        70       173        98
VIS    2025250     91400   16.9000 -110.9200       8.6        61       169        98
VIS    2025250     91400   16.9000 -110.9600       8.4        62       168       100
VIS    2025250     91400   16.8900 -111.0000       8.6        63       170       100
VIS    2025250     91400   16.9000 -111.0200       8.8        62       169       100
VIS    2025250     91400   16.8900 -111.1200       8.4        60       165       100
VIS    2025250     91400   16.8900 -111.1500       9.2        70       167        97
VIS    2025250     91400   16.8900 -111.2200       8.9        72       171        99
VIS    2025250     91400   16.8800 -111.2600       8.8        73       170        97
VIS    2025250     91400   16.8900 -111.2900       9.0        68       169        98
VIS    2025250     91400   16.9000 -111.3300       8.9        60       167       100
VIS    2025250     91400   16.8800 -111.3900      10.2        54       171        98
VIS    2025250     91400   16.8900 -111.4100       9.1        59       171       100
VIS    2025250     91400   16.9000 -111.4400       8.7        70       178        99
VIS    2025250     91400   16.8800 -111.4500       8.6        71       178        99
VIS    2025250     91400   16.8800 -111.4900       7.5        62       178        99
VIS    2025250     91400   16.8800 -111.5100       7.7        60       177        99
VIS    2025250     91400   16.9000 -111.5600       8.8        60       175        95
VIS    2025250     91400   16.9000 -111.5700       8.7        61       175        95
VIS    2025250     91400   16.8800 -111.6100       8.7        64       172       100
VIS    2025250     91400   16.8900 -111.6400       8.3        62       170       100
VIS    2025250     91400   16.8700 -111.6700       8.0        53       170        94
VIS    2025250     91400   16.8900 -111.7700       8.6        53       164        93
VIS    2025250     91400   16.8700 -111.8100       8.9        52       164        98
VIS    2025250     91400   16.8700 -111.8900      13.6        42       164        97
VIS    2025250     91400   16.8800 -111.9100      13.5        42       164        99
VIS    2025250     91400   16.8800 -111.9300      13.8        42       162        99
VIS    2025250     91400   16.8700 -111.9700      14.0        48       162        99
VIS    2025250     91400   16.8800 -111.9900      14.5        56       164        97
VIS    2025250     91400   16.8800 -112.0100      14.7        56       164        97
VIS    2025250     91400   16.8700 -112.0600      17.1        35       163        99
VIS    2025250     91400   16.8600 -112.0900      17.7        35       165       100
VIS    2025250     91400   16.8800 -112.1200      15.9        23       162       100
VIS    2025250     91400   16.8800 -112.1400      15.1        22       161       100
VIS    2025250     91400   16.8800 -112.1600      14.4        25       163       100
VIS    2025250     91400   16.8600 -112.1900      15.2        29       166        93
VIS    2025250     91400   16.8700 -112.2300      12.2        15       165        94
VIS    2025250     91400   16.8700 -112.2500      12.5        10       165        92
VIS    2025250     91400   16.8600 -112.4900      14.0        38       153        99
VIS    2025250     91400   16.8500 -112.5100      13.6        41       153       100
VIS    2025250     91400   16.8700 -112.5500      13.7        47       150        99
VIS    2025250     91400   16.8600 -112.5700      12.8        44       149        97
VIS    2025250     91400   16.8500 -112.5900      12.3        39       145        97
VIS    2025250     91400   16.8500 -112.6400      13.5        35       144       100
VIS    2025250     91400   16.8500 -112.6600      13.8        34       146       100
VIS    2025250     91400   16.8400 -112.7600      12.1        30       154        93
VIS    2025250     91400   16.8600 -112.8300      13.2        45       160       100
VIS    2025250     91400   16.8500 -112.8500      13.2        52       162        94
VIS    2025250     91400   16.8400 -112.8800      13.9        59       162        99
VIS    2025250     91400   16.8500 -112.9400      13.3        35       162        95
VIS    2025250     91400   16.8500 -112.9600      13.5        36       162        97
VIS    2025250     91400   16.8500 -113.0100      13.6        40       160       100
VIS    2025250     91400   16.8400 -113.0400      12.3        31       160       100
VIS    2025250     91400   16.8400 -113.0500      12.0        31       163       100
VIS    2025250     91400   16.8500 -113.0900      14.3        27       156        97
VIS    2025250     91400   16.8500 -113.1300      14.2        32       159        95
VIS    2025250     91400   16.8500 -113.1700      13.0        33       158        99
VIS    2025250     91400   16.8400 -113.2000      13.6        28       159       100
VIS    2025250     91400   16.8500 -113.2200      13.6        27       159        99
VIS    2025250     91400   16.8300 -113.2700      13.6        28       166        95
VIS    2025250     91400   16.8400 -113.3000      14.6        32       166        91
VIS    2025250     91400   16.8500 -113.3300      14.2        42       165        96
VIS    2025250     91400   16.8400 -113.3300      14.2        41       166        95
VIS    2025250     91400   16.8500 -113.3800      12.7        32       168       100
VIS    2025250     91400   16.8200 -113.4700      12.7        27       169        99
VIS    2025250     91400   16.8300 -113.4800      12.2        26       169        97
VIS    2025250     91400   16.8200 -113.5800       9.4        18       167       100
VIS    2025250     91400   16.8300 -113.6200      10.8        19       164        96
VIS    2025250     91400   16.8300 -113.6700      11.9        25       146        97
VIS    2025250     91400   16.8300 -113.6900      12.0        30       126        96
VIS    2025250     91400   16.8300 -113.7000      10.6        30       123        95
VIS    2025250     91400   16.8400 -113.7400      10.2        25       130        98
VIS    2025250     91400   16.8300 -113.7600       9.9        19       129        98
VIS    2025250     91400   16.8300 -113.8100       8.2         8       147        99
VIS    2025250     91400   16.8200 -113.8200       8.3         5       148        97
VIS    2025250     91400   16.8300 -113.8600       7.5       353       159        91
VIS    2025250     91400   16.8300 -113.8700       8.1       352       163        95
VIS    2025250     91400   16.8300 -113.9100       7.5       352       168        96
VIS    2025250     91400   16.8300 -113.9300       5.7       351       168        97
VIS    2025250     91400   16.8100 -113.9800       7.3         7       165        94
VIS    2025250     91400   16.8200 -113.9900       7.7         5       163        97
VIS    2025250     91400   16.8000 -114.2000       7.9        24       163        99
VIS    2025250     91400   16.8200 -114.2100       8.8        17       163        95
VIS    2025250     91400   16.8000 -114.2700      10.1        13       172        99
VIS    2025250     91400   16.8200 -114.2700      10.1        14       172        98
VIS    2025250     91400   16.8200 -114.3000      10.3        14       174        97
VIS    2025250     91400   16.8000 -114.3500      14.4         8       180       100
VIS    2025250     91400   16.8100 -114.3500      14.5         8       180       100
VIS    2025250     91400   16.8200 -114.4100      10.7         8       178       100
VIS    2025250     91400   16.8100 -114.4400      10.8        11       183       100
VIS    2025250     91400   16.8000 -114.4800      10.6         8       185        99
VIS    2025250     91400   16.8000 -115.0700       8.3        18       174       100
VIS    2025250     91400   16.8000 -115.1100      13.6        40       172        92
VIS    2025250     91400   16.7800 -115.1700       8.7        18       170        99
VIS    2025250     91400   16.8000 -115.2100       7.8        19       171        99
VIS    2025250     91400   16.7600 -116.0200      18.2       357       184        90
VIS    2025250     91400   16.7600 -116.0200      18.3       357       184        90
VIS    2025250     91400   16.7300 -118.1000      10.4       351       181        97
VIS    2025250     91400   16.7200 -118.1400       4.2        53       181        96
VIS    2025250     91400   16.7000 -118.3800       7.9        57       179        90
VIS    2025250     91400   16.9300 -109.0200       4.7       109       182        94
VIS    2025250     91400   16.9400 -109.0400       6.7        98       183       100
VIS    2025250     91400   16.8900 -110.5300       9.4        48       189        96
VIS    2025250     91400   16.8800 -110.6100      10.1        52       186        97
VIS    2025250     91400   16.8900 -110.6400       8.8        58       186       100
VIS    2025250     91400   16.8800 -110.6900       8.8        62       182        99
VIS    2025250     91400   16.9000 -110.6900       9.1        65       185        98
VIS    2025250     91400   16.8700 -110.8300       9.2        41       176        93
VIS    2025250     91400   16.8900 -110.8600       7.2        74       175        97
VIS    2025250     91400   16.8700 -110.8700       8.0        59       173        91
VIS    2025250     91400   16.8800 -110.9000       8.4        57       172        99
VIS    2025250     91400   16.8800 -110.9700       8.7        65       170        98
VIS    2025250     91400   16.8800 -111.0000       8.7        59       170        98
VIS    2025250     91400   16.8800 -111.0100       8.8        59       170        99
VIS    2025250     91400   16.8700 -111.0500       7.9        54       170        91
VIS    2025250     91400   16.8700 -111.0900       7.1        53       167        91
VIS    2025250     91400   16.8700 -111.1300       8.3        59       166       100
VIS    2025250     91400   16.8800 -111.1300       8.4        61       166       100
VIS    2025250     91400   16.8600 -111.1800       9.6        62       175        99
VIS    2025250     91400   16.8600 -111.2000       9.3        67       175        99
VIS    2025250     91400   16.8800 -111.2300       8.8        72       175       100
VIS    2025250     91400   16.8600 -111.2800       8.6        69       170        99
VIS    2025250     91400   16.8700 -111.3000       8.6        67       169       100
VIS    2025250     91400   16.8800 -111.3100       9.1        63       169        95
VIS    2025250     91400   16.8800 -111.3800      10.7        54       171        98
VIS    2025250     91400   16.8800 -111.4100       8.8        63       175        99
VIS    2025250     91400   16.8600 -111.4500       8.8        73       179        99
VIS    2025250     91400   16.8700 -111.4800       8.6        69       178       100
VIS    2025250     91400   16.8600 -111.4900       8.6        69       179        99
VIS    2025250     91400   16.8700 -111.5100       8.2        62       177        95
VIS    2025250     91400   16.8700 -111.5500       8.5        65       177        98
VIS    2025250     91400   16.8700 -111.5800       8.7        65       175        98
VIS    2025250     91400   16.8600 -111.6200       8.7        67       172        99
VIS    2025250     91400   16.8700 -111.6500       7.9        58       170        96
VIS    2025250     91400   16.8600 -111.6600       7.9        57       170        96
VIS    2025250     91400   16.8500 -111.8000       9.0        52       164        99
VIS    2025250     91400   16.8400 -111.8200       8.9        43       168        99
VIS    2025250     91400   16.8600 -111.9200      13.1        43       164        96
VIS    2025250     91400   16.8400 -112.0100       9.8        13       168        90
VIS    2025250     91400   16.8400 -112.0700      20.1        38       167       100
VIS    2025250     91400   16.8500 -112.0800      18.7        39       166        99
VIS    2025250     91400   16.8500 -112.1200      15.6        21       167       100
VIS    2025250     91400   16.8300 -112.2700      14.4         6       163       100
VIS    2025250     91400   16.8400 -112.5000      13.3        46       153        96
VIS    2025250     91400   16.8300 -112.5100      13.3        47       154        95
VIS    2025250     91400   16.8300 -112.5500      15.0        54       154        99
VIS    2025250     91400   16.8400 -112.5600      13.1        50       154        98
VIS    2025250     91400   16.8300 -112.6100      12.4        35       144        98
VIS    2025250     91400   16.8200 -112.6500      13.2        30       144        98
VIS    2025250     91400   16.8200 -112.6500      13.3        29       144        99
VIS    2025250     91400   16.8300 -112.6800      13.9        25       151        99
VIS    2025250     91400   16.8300 -112.7200      13.1        25       153        97
VIS    2025250     91400   16.8300 -112.7400      12.4        26       153        96
VIS    2025250     91400   16.8300 -112.8800      13.8        59       162        99
VIS    2025250     91400   16.8200 -112.9900      14.0        40       165        97
VIS    2025250     91400   16.8200 -113.0000      13.9        40       165        98
VIS    2025250     91400   16.8100 -113.0500      11.5        27       166        98
VIS    2025250     91400   16.8300 -113.0600      11.6        28       163       100
VIS    2025250     91400   16.8100 -113.0800      11.8        28       164       100
VIS    2025250     91400   16.8300 -113.1600      14.1        33       160        95
VIS    2025250     91400   16.8200 -113.1800      13.8        31       160       100
VIS    2025250     91400   16.8300 -113.2000      13.9        27       160       100
VIS    2025250     91400   16.8200 -113.2400      13.9        26       160       100
VIS    2025250     91400   16.8100 -113.2800      13.2        31       166        95
VIS    2025250     91400   16.8100 -113.2800      13.8        30       166        93
VIS    2025250     91400   16.8100 -113.4400      11.7        24       173        91
VIS    2025250     91400   16.8200 -113.4600      12.8        27       169        99
VIS    2025250     91400   16.8000 -113.5000      12.7        29       168        99
VIS    2025250     91400   16.8000 -113.5500       8.2        24       170        98
VIS    2025250     91400   16.8000 -113.5900      10.0        17       169       100
VIS    2025250     91400   16.8000 -113.6000      10.2        16       169       100
VIS    2025250     91400   16.8200 -113.6200      10.0        17       164        97
VIS    2025250     91400   16.8000 -113.6700      11.6        27       142        91
VIS    2025250     91400   16.8100 -113.6800      12.0        29       142        96
VIS    2025250     91400   16.8000 -113.7700      11.3        22       123        95
VIS    2025250     91400   16.8100 -113.8100       9.8        10       152       100
VIS    2025250     91400   16.8100 -113.8200       9.4         8       152        99
VIS    2025250     91400   16.8100 -113.8600       8.2         0       164        96
VIS    2025250     91400   16.7900 -113.9000       6.8         0       169        97
VIS    2025250     91400   16.8100 -113.9100       6.7       359       169        99
VIS    2025250     91400   16.7900 -113.9600       7.6        11       167        99
VIS    2025250     91400   16.8000 -113.9600       7.2        10       167        98
VIS    2025250     91400   16.7900 -114.0500      10.8         6       164        90
VIS    2025250     91400   16.8000 -114.1400      13.1        28       160       100
VIS    2025250     91400   16.7900 -114.2200       8.9        18       167       100
VIS    2025250     91400   16.7900 -114.2500      10.1        13       171       100
VIS    2025250     91400   16.7900 -114.2700      10.2        13       172       100
VIS    2025250     91400   16.7800 -114.3200      12.7         5       179        99
VIS    2025250     91400   16.7900 -114.3500      14.1         7       180       100
VIS    2025250     91400   16.8000 -114.3600      14.5         8       180       100
VIS    2025250     91400   16.7800 -114.4000       9.3        10       183       100
VIS    2025250     91400   16.7800 -114.4400       9.7        12       184        99
VIS    2025250     91400   16.7800 -114.4400      10.1        12       184        99
VIS    2025250     91400   16.7900 -114.4700      10.8        10       185        99
VIS    2025250     91400   16.7700 -115.0400      10.7        23       175       100
VIS    2025250     91400   16.7600 -115.0800      11.9        33       173        99
VIS    2025250     91400   16.7700 -115.4700       4.1       256       177        94
VIS    2025250     91400   16.6800 -118.3900       8.5        83       179        99
VIS    2025250     91400   16.6600 -119.5000      16.5        22       165       100
VIS    2025250     91400   16.6600 -119.5300      16.6        23       164       100
VIS    2025250     91400   16.9200 -108.9900       5.4        91       180        95
VIS    2025250     91400   16.9200 -109.0200       5.0       101       182        95
VIS    2025250     91400   16.8700 -110.4100       8.2        60       185        99
VIS    2025250     91400   16.8700 -110.4500       7.2        69       184        95
VIS    2025250     91400   16.8600 -110.6100       9.6        50       186        99
VIS    2025250     91400   16.8700 -110.6800       8.4        59       182        99
VIS    2025250     91400   16.8600 -110.6900       8.2        60       182        99
VIS    2025250     91400   16.8600 -110.8300       9.8        38       171        96
VIS    2025250     91400   16.8700 -110.8400       9.5        42       176        95
VIS    2025250     91400   16.8700 -110.9100       8.3        56       170        98
VIS    2025250     91400   16.8500 -110.9400       8.0        59       168        96
VIS    2025250     91400   16.8600 -110.9800       8.7        60       170        98
VIS    2025250     91400   16.8400 -111.0000       8.9        54       172        98
VIS    2025250     91400   16.8600 -111.0200       8.8        55       172        98
VIS    2025250     91400   16.8600 -111.0800       6.8        57       168        90
VIS    2025250     91400   16.8500 -111.1200       7.2        64       170       100
VIS    2025250     91400   16.8500 -111.1800       9.6        56       175        97
VIS    2025250     91400   16.8400 -111.2100       9.3        62       175        99
VIS    2025250     91400   16.8400 -111.2300       9.2        66       176       100
VIS    2025250     91400   16.8400 -111.2800       8.6        71       170       100
VIS    2025250     91400   16.8500 -111.2800       8.5        70       170       100
VIS    2025250     91400   16.8400 -111.3300      10.3        63       173        99
VIS    2025250     91400   16.8300 -111.3700      13.3        55       173        94
VIS    2025250     91400   16.8400 -111.4500       8.6        68       179        98
VIS    2025250     91400   16.8500 -111.4800       8.6        70       179        99
VIS    2025250     91400   16.8500 -111.4900       8.6        70       179        99
VIS    2025250     91400   16.8300 -111.5300       8.6        72       178        91
VIS    2025250     91400   16.8500 -111.5700       8.4        79       177        97
VIS    2025250     91400   16.8400 -111.5800       8.7        79       177        94
VIS    2025250     91400   16.8400 -111.6800       8.2        59       175        95
VIS    2025250     91400   16.8400 -111.6900       7.9        51       174        98
VIS    2025250     91400   16.8400 -111.7900       9.1        51       168        98
VIS    2025250     91400   16.8300 -111.8200       9.5        41       170        99
VIS    2025250     91400   16.8300 -111.8600       9.1        36       170        96
VIS    2025250     91400   16.8200 -111.9900      10.1        11       168        97
VIS    2025250     91400   16.8300 -112.0300       9.8        14       168        94
VIS    2025250     91400   16.8200 -112.0700      20.1        42       168        96
VIS    2025250     91400   16.8200 -112.0800      20.7        40       168       100
VIS    2025250     91400   16.8200 -112.2400      11.3         9       164        99
VIS    2025250     91400   16.8200 -112.2600      13.8         7       164        98
VIS    2025250     91400   16.8100 -112.3000      14.6         6       164        99
VIS    2025250     91400   16.8200 -112.4700      15.7        35       154        94
VIS    2025250     91400   16.8200 -112.5000      13.1        45       153        94
VIS    2025250     91400   16.8200 -112.5100      13.0        46       154        97
VIS    2025250     91400   16.8000 -112.5500      15.7        56       154        91
VIS    2025250     91400   16.8100 -112.6200      12.5        32       143        98
VIS    2025250     91400   16.8100 -112.6300      12.6        31       143        98
VIS    2025250     91400   16.8000 -112.6600      12.5        30       144        97
VIS    2025250     91400   16.8000 -112.6900      14.1        26       147        92
VIS    2025250     91400   16.8000 -112.7300      13.8        27       152        90
VIS    2025250     91400   16.8000 -112.7400      13.0        28       153        95
VIS    2025250     91400   16.7900 -112.9700      10.4        36       167        96
VIS    2025250     91400   16.7900 -112.9800      11.5        37       165        98
VIS    2025250     91400   16.7900 -113.0200      12.9        36       168       100
VIS    2025250     91400   16.8000 -113.0400      12.0        29       168        97
VIS    2025250     91400   16.8100 -113.0600      11.4        26       166        98
VIS    2025250     91400   16.8000 -113.0900      12.2        33       164       100
VIS    2025250     91400   16.7800 -113.1200      12.5        36       167       100
VIS    2025250     91400   16.7800 -113.2000      11.8        34       166       100
VIS    2025250     91400   16.7800 -113.2200      12.4        33       167        98
VIS    2025250     91400   16.7800 -113.2400      12.7        33       168        96
VIS    2025250     91400   16.7900 -113.2900      16.7        31       168        98
VIS    2025250     91400   16.7900 -113.3700      12.9        28       175       100
VIS    2025250     91400   16.8000 -113.3700      13.0        29       174       100
VIS    2025250     91400   16.8000 -113.4300      11.7        23       173        91
VIS    2025250     91400   16.7800 -113.4600      12.1        24       173        95
VIS    2025250     91400   16.7900 -113.5100       8.1        27       173       100
VIS    2025250     91400   16.7900 -113.5400       8.1        26       172       100
VIS    2025250     91400   16.7700 -113.6500      12.3        27       148        92
VIS    2025250     91400   16.7700 -113.6800      11.9        31       143        91
VIS    2025250     91400   16.7700 -113.6800      12.4        34       127        98
VIS    2025250     91400   16.7700 -113.7400      13.1        44       112        92
VIS    2025250     91400   16.7800 -113.8200      10.9        15       152       100
VIS    2025250     91400   16.7900 -113.8200      10.5        14       152       100
VIS    2025250     91400   16.7600 -113.8800      10.6         9       167        97
VIS    2025250     91400   16.7800 -113.9000       6.8         3       169        96
VIS    2025250     91400   16.7700 -113.9600       8.4        10       167        99
VIS    2025250     91400   16.7800 -113.9700       8.3        11       167       100
VIS    2025250     91400   16.7700 -114.0000      10.1        11       166        99
VIS    2025250     91400   16.7600 -114.0300      10.4        14       164        99
VIS    2025250     91400   16.7600 -114.0600      12.5        19       161        98
VIS    2025250     91400   16.7600 -114.0900      12.0        18       161        98
VIS    2025250     91400   16.7700 -114.1500      13.0        29       163       100
VIS    2025250     91400   16.7500 -114.2300       9.3        17       171       100
VIS    2025250     91400   16.7700 -114.2500      10.0        16       172       100
VIS    2025250     91400   16.7600 -114.3000      10.3        19       179       100
VIS    2025250     91400   16.7700 -114.3200      11.5         8       179       100
VIS    2025250     91400   16.7500 -114.3600      10.3        13       184        99
VIS    2025250     91400   16.7600 -114.3600      10.7        13       184        99
VIS    2025250     91400   16.7700 -114.3900       9.7        11       183       100
VIS    2025250     91400   16.7700 -114.4300       9.8        11       189        99
VIS    2025250     91400   16.7300 -115.0300      11.5        26       175       100
VIS    2025250     91400   16.7500 -115.0500      11.0        27       174       100
VIS    2025250     91400   16.7500 -115.0800      11.1        33       173        98
VIS    2025250     91400   16.6600 -118.3700       8.4        64       179       100
VIS    2025250     91400   16.6500 -118.4700       4.7        44       177        97
VIS    2025250     91400   16.6400 -119.5000      16.4        21       165       100
VIS    2025250     91400   16.6500 -119.5000      16.5        22       165       100
VIS    2025250     91400   16.6400 -119.5400      16.8        22       164       100
VIS    2025250     91400   16.8500 -110.4400       7.3        61       185        97
VIS    2025250     91400   16.8400 -110.6000       9.6        47       185       100
VIS    2025250     91400   16.8400 -110.6200       9.7        48       185       100
VIS    2025250     91400   16.8300 -110.6600      14.2        50       186        94
VIS    2025250     91400   16.8300 -110.6700      14.3        50       186        94
VIS    2025250     91400   16.8500 -110.7200       7.6        60       186       100
VIS    2025250     91400   16.8400 -110.7500       6.5        54       180       100
VIS    2025250     91400   16.8400 -110.8200      10.3        39       171        93
VIS    2025250     91400   16.8200 -110.8700      10.3        46       172        96
VIS    2025250     91400   16.8200 -110.9300       7.5        60       168        95
VIS    2025250     91400   16.8200 -110.9600       7.9        62       168        94
VIS    2025250     91400   16.8300 -111.0000       9.1        52       174        99
VIS    2025250     91400   16.8400 -111.0300       8.8        50       175        99
VIS    2025250     91400   16.8200 -111.0600       7.6        51       175       100
VIS    2025250     91400   16.8400 -111.0900       6.7        59       172        97
VIS    2025250     91400   16.8300 -111.2100       9.2        61       173        99
VIS    2025250     91400   16.8200 -111.2400       8.9        63       176       100
VIS    2025250     91400   16.8300 -111.2700       8.7        72       176       100
VIS    2025250     91400   16.8300 -111.2900       8.5        72       173       100
VIS    2025250     91400   16.8100 -111.3300       9.3        69       173       100
VIS    2025250     91400   16.8200 -111.3600      11.6        61       173        91
VIS    2025250     91400   16.8200 -111.3900      11.0        50       176        99
VIS    2025250     91400   16.8200 -111.4300       8.9        55       179        90
VIS    2025250     91400   16.8100 -111.4600       7.8        59       179        97
VIS    2025250     91400   16.8100 -111.4800       8.0        60       179        98
VIS    2025250     91400   16.8200 -111.5000       8.4        65       178        94
VIS    2025250     91400   16.8100 -111.5400       8.7        66       179        97
VIS    2025250     91400   16.8100 -111.5700       9.1        70       180       100
VIS    2025250     91400   16.8100 -111.6800       6.8        64       176        98
VIS    2025250     91400   16.8100 -111.8100       9.9        42       173        99
VIS    2025250     91400   16.8100 -111.8200       9.7        40       172        98
VIS    2025250     91400   16.7900 -111.8900       5.5        39       172        95
VIS    2025250     91400   16.8100 -111.9900      10.5         9       168       100
VIS    2025250     91400   16.7900 -112.0200       9.3        16       169       100
VIS    2025250     91400   16.7900 -112.0200       9.0        19       170       100
VIS    2025250     91400   16.7900 -112.0700      19.6        48       169        95
VIS    2025250     91400   16.8000 -112.0900      19.6        47       169        95
VIS    2025250     91400   16.8000 -112.2900      14.3         5       163       100
VIS    2025250     91400   16.7700 -112.5900      12.1        27       147       100
VIS    2025250     91400   16.7800 -112.6200      11.6        29       145        99
VIS    2025250     91400   16.7900 -112.6400      11.6        32       144       100
VIS    2025250     91400   16.7800 -112.6700      11.9        32       144        99
VIS    2025250     91400   16.7800 -112.6900      13.1        30       147        94
VIS    2025250     91400   16.7600 -112.9400      10.3        28       167        97
VIS    2025250     91400   16.7600 -112.9500      10.2        29       167        96
VIS    2025250     91400   16.7800 -112.9700      10.6        36       165        97
VIS    2025250     91400   16.7600 -113.0300      13.8        30       166        98
VIS    2025250     91400   16.7700 -113.0400      13.4        30       166        94
VIS    2025250     91400   16.7600 -113.1000      13.3        39       167        96
VIS    2025250     91400   16.7700 -113.1300      12.0        38       168       100
VIS    2025250     91400   16.7800 -113.1500      11.9        40       168        99
VIS    2025250     91400   16.7700 -113.1800      10.3        40       168        98
VIS    2025250     91400   16.7700 -113.2300      12.2        34       171       100
VIS    2025250     91400   16.7800 -113.2400      12.5        34       168        98
VIS    2025250     91400   16.7700 -113.3600      12.6        28       175        99
VIS    2025250     91400   16.7600 -113.3900      12.1        27       175        95
VIS    2025250     91400   16.7700 -113.4500      12.1        23       173        97
VIS    2025250     91400   16.7500 -113.5100      17.2        32       173       100
VIS    2025250     91400   16.7700 -113.5400       8.1        26       173        99
VIS    2025250     91400   16.7500 -113.5700      16.8        34       155       100
VIS    2025250     91400   16.7600 -113.6900      12.4        34       127        97
VIS    2025250     91400   16.7600 -113.8200      11.2        15       155        99
VIS    2025250     91400   16.7600 -113.8300      11.1        14       160        99
VIS    2025250     91400   16.7500 -113.8900      11.9         9       168        92
VIS    2025250     91400   16.7400 -113.9400      11.5         9       170       100
VIS    2025250     91400   16.7500 -113.9400      10.1         8       169        91
VIS    2025250     91400   16.7600 -113.9800      10.2         9       167       100
VIS    2025250     91400   16.7400 -114.0400      11.5        17       162        92
VIS    2025250     91400   16.7500 -114.0500      12.4        19       161        97
VIS    2025250     91400   16.7500 -114.0900      12.0        21       161        92
VIS    2025250     91400   16.7400 -114.1100      13.4        25       161        95
VIS    2025250     91400   16.7500 -114.2300       9.2        17       171       100
VIS    2025250     91400   16.7500 -114.2600      10.0        19       172       100
VIS    2025250     91400   16.7400 -114.3000      11.5        20       182        98
VIS    2025250     91400   16.7500 -114.3300      10.2        13       184       100
VIS    2025250     91400   16.7400 -114.3600      10.0        14       188       100
VIS    2025250     91400   16.7500 -114.3600      10.2        14       186       100
VIS    2025250     91400   16.7500 -114.3900      10.0        12       189       100
VIS    2025250     91400   16.7100 -115.0100      13.1        30       173        92
VIS    2025250     91400   16.7100 -115.0400      12.4        32       173        97
VIS    2025250     91400   16.7200 -115.0700      12.6        32       174        97
VIS    2025250     91400   16.7100 -115.1700       7.6        14       171        91
VIS    2025250     91400   16.7100 -115.1800       8.1        16       171        99
VIS    2025250     91400   16.6500 -118.3500       8.3        63       177        99
VIS    2025250     91400   16.6500 -118.3800       8.4        67       179       100
VIS    2025250     91400   16.6500 -118.4700       4.5        47       177        97
VIS    2025250     91400   16.6300 -119.5000      16.5        20       164       100
VIS    2025250     91400   16.6100 -119.5100      16.4        20       160       100
VIS    2025250     91400   16.6200 -119.5600      18.4        15       161       100
VIS    2025250     91400   16.6100 -119.5600      18.2        15       162       100
VIS    2025250     91400   16.8000 -110.7000      11.9        50       187        94
VIS    2025250     91400   16.8200 -110.8500      10.4        43       171        95
VIS    2025250     91400   16.8000 -110.8800      10.9        52       171        94
VIS    2025250     91400   16.8100 -110.9600       7.7        60       168        99
VIS    2025250     91400   16.8000 -111.0400       7.8        51       178        99
VIS    2025250     91400   16.8100 -111.0700       7.5        55       175       100
VIS    2025250     91400   16.8000 -111.1100       8.2        67       174       100
VIS    2025250     91400   16.7900 -111.2300       9.0        56       176       100
VIS    2025250     91400   16.7900 -111.2500       9.0        56       174        99
VIS    2025250     91400   16.7900 -111.2900       9.3        60       173        99
VIS    2025250     91400   16.7900 -111.3000       8.9        67       173        99
VIS    2025250     91400   16.8000 -111.3300       8.8        74       173       100
VIS    2025250     91400   16.8000 -111.4000      10.4        50       176        99
VIS    2025250     91400   16.7900 -111.4200       9.7        52       176        99
VIS    2025250     91400   16.7900 -111.4600       7.7        53       179        97
VIS    2025250     91400   16.7800 -111.4900       7.6        53       177        96
VIS    2025250     91400   16.7900 -111.5100       8.0        57       177        97
VIS    2025250     91400   16.8000 -111.5500       9.0        65       178        94
VIS    2025250     91400   16.7900 -111.5700       9.6        71       179        98
VIS    2025250     91400   16.7800 -111.7300      11.7        55       177        95
VIS    2025250     91400   16.7800 -111.7400      11.9        57       178        93
VIS    2025250     91400   16.7800 -111.8500       7.5        43       173        92
VIS    2025250     91400   16.7700 -111.9900      10.9         8       170        99
VIS    2025250     91400   16.7700 -112.0100       8.9        18       170        99
VIS    2025250     91400   16.7700 -112.0300       8.8        21       170        99
VIS    2025250     91400   16.7500 -112.4300      15.6        41       154        96
VIS    2025250     91400   16.7500 -112.4400      15.6        41       154        96
VIS    2025250     91400   16.7500 -112.4900      15.8        24       145       100
VIS    2025250     91400   16.7600 -112.5100      16.0        30       147        98
VIS    2025250     91400   16.7600 -112.5200      16.1        31       147        98
VIS    2025250     91400   16.7500 -112.5600      15.1        39       150       100
VIS    2025250     91400   16.7600 -112.5900      12.0        28       147       100
VIS    2025250     91400   16.7500 -112.6300      10.7        31       143        99
VIS    2025250     91400   16.7700 -112.6500      10.6        35       143        95
VIS    2025250     91400   16.7700 -112.6700      11.6        34       144       100
VIS    2025250     91400   16.7500 -112.6900      11.2        37       151        98
VIS    2025250     91400   16.7500 -112.7200      12.3        29       153        99
VIS    2025250     91400   16.7500 -112.7600      11.7        18       154        99
VIS    2025250     91400   16.7500 -112.8300      17.7        22       157        92
VIS    2025250     91400   16.7500 -112.8600      17.7        35       161        97
VIS    2025250     91400   16.7500 -112.8700      17.8        37       162        98
VIS    2025250     91400   16.7500 -112.9000      17.1        44       162       100
VIS    2025250     91400   16.7600 -112.9400      10.2        29       167        97
VIS    2025250     91400   16.7600 -112.9500      10.1        29       167        96
VIS    2025250     91400   16.7500 -113.0100      13.5        30       167        97
VIS    2025250     91400   16.7500 -113.0500      14.2        32       166        95
VIS    2025250     91400   16.7400 -113.0900      13.8        41       167        90
VIS    2025250     91400   16.7500 -113.1200      11.9        37       169        94
VIS    2025250     91400   16.7400 -113.1400      10.3        40       169       100
VIS    2025250     91400   16.7400 -113.1700       9.7        44       169        99
VIS    2025250     91400   16.7300 -113.2000      10.1        36       171        98
VIS    2025250     91400   16.7500 -113.2200      11.9        36       171        97
VIS    2025250     91400   16.7400 -113.2700      14.0        34       174        98
VIS    2025250     91400   16.7400 -113.3700      12.6        27       175        98
VIS    2025250     91400   16.7400 -113.3800      12.7        27       175        97
VIS    2025250     91400   16.7400 -113.4200      12.0        23       174        93
VIS    2025250     91400   16.7300 -113.4900      17.3        34       163       100
VIS    2025250     91400   16.7200 -113.5000      17.3        35       163        99
VIS    2025250     91400   16.7200 -113.5400      17.7        33       155       100
VIS    2025250     91400   16.7200 -113.5500      17.5        32       155       100
VIS    2025250     91400   16.7300 -113.6000      15.4        31       145        98
VIS    2025250     91400   16.7300 -113.6200      15.6        30       127        95
VIS    2025250     91400   16.7200 -113.6500      15.7        29       127        94
VIS    2025250     91400   16.7200 -113.7200      15.7        31       116        96
VIS    2025250     91400   16.7200 -113.7200      16.0        30       117        97
VIS    2025250     91400   16.7200 -113.7500      17.1        25       117       100
VIS    2025250     91400   16.7200 -113.7900      11.5        18       153        94
VIS    2025250     91400   16.7300 -113.8100      11.8        16       153        92
VIS    2025250     91400   16.7200 -113.8600      10.0       357       171        92
VIS    2025250     91400   16.7200 -113.8700      10.8       358       169        99
VIS    2025250     91400   16.7200 -113.9300      11.4        10       171       100
VIS    2025250     91400   16.7300 -113.9500      11.6         9       169       100
VIS    2025250     91400   16.7300 -114.0000       9.7        10       167        99
VIS    2025250     91400   16.7300 -114.0000      10.1        12       167        97
VIS    2025250     91400   16.7200 -114.0300      11.4        16       162        96
VIS    2025250     91400   16.7300 -114.0700      12.4        23       162        91
VIS    2025250     91400   16.7200 -114.0900      13.0        25       162       100
VIS    2025250     91400   16.7100 -114.1200      12.1        29       163        91
VIS    2025250     91400   16.7100 -114.1600      12.9        22       166        99
VIS    2025250     91400   16.7200 -114.1900      12.2        22       166        98
VIS    2025250     91400   16.7100 -114.2300      11.0        19       172        99
VIS    2025250     91400   16.7200 -114.2400      10.0        18       172       100
VIS    2025250     91400   16.7100 -114.2600      10.9        20       174       100
VIS    2025250     91400   16.7100 -114.2900      11.5        22       174       100
VIS    2025250     91400   16.7200 -114.3300       9.9        13       186        99
VIS    2025250     91400   16.6900 -114.9700       9.4        31       178        92
VIS    2025250     91400   16.7100 -115.0000      13.1        31       172        93
VIS    2025250     91400   16.6900 -115.0200      11.7        34       170        98
VIS    2025250     91400   16.6900 -115.0500      11.9        36       169        97
VIS    2025250     91400   16.6900 -115.1800       8.8        13       171       100
VIS    2025250     91400   16.6800 -115.1800       9.1        15       171       100
VIS    2025250     91400   16.6300 -117.6300      13.7         5       179        90
VIS    2025250     91400   16.6300 -118.3200      17.9        32       169        92
VIS    2025250     91400   16.6200 -118.3400      18.2        31       170        97
VIS    2025250     91400   16.5900 -119.5100      16.0        20       159       100
VIS    2025250     91400   16.6000 -119.5100      16.2        20       159       100
VIS    2025250     91400   16.5800 -119.5400      17.1        17       159       100
VIS    2025250     91400   16.7800 -110.6800       9.8        41       188        93
VIS    2025250     91400   16.7800 -110.6900      10.3        44       188        92
VIS    2025250     91400   16.8000 -110.7500       8.0        57       183        99
VIS    2025250     91400   16.7900 -110.8300      10.4        51       171        93
VIS    2025250     91400   16.7700 -110.8800      10.6        44       170        95
VIS    2025250     91400   16.7800 -110.9100       9.3        36       171        98
VIS    2025250     91400   16.7800 -110.9200       9.2        35       171        97
VIS    2025250     91400   16.7700 -110.9600       9.5        25       171        98
VIS    2025250     91400   16.7800 -110.9900       6.9        35       173        97
VIS    2025250     91400   16.7700 -111.0500      11.5        23       175        99
VIS    2025250     91400   16.7700 -111.0800       7.9        71       175        99
VIS    2025250     91400   16.7900 -111.1000       8.0        66       174        99
VIS    2025250     91400   16.7600 -111.1600      11.0        39       178       100
VIS    2025250     91400   16.7600 -111.1900      10.2        48       177        91
VIS    2025250     91400   16.7700 -111.2200       9.2        54       174        95
VIS    2025250     91400   16.7600 -111.2600       8.5        58       173       100
VIS    2025250     91400   16.7700 -111.2700       8.6        59       172        99
VIS    2025250     91400   16.7600 -111.3100       9.5        68       173       100
VIS    2025250     91400   16.7700 -111.3300       9.1        69       175       100
VIS    2025250     91400   16.7600 -111.3800       7.6        61       174        97
VIS    2025250     91400   16.7600 -111.4100       9.2        55       175        99
VIS    2025250     91400   16.7600 -111.4200       9.2        56       176        98
VIS    2025250     91400   16.7800 -111.4700       7.7        56       176        97
VIS    2025250     91400   16.7500 -111.5000       7.7        55       180        95
VIS    2025250     91400   16.7600 -111.5200       8.0        58       177        96
VIS    2025250     91400   16.7500 -111.5400       8.4        56       180        90
VIS    2025250     91400   16.7600 -111.7300      11.5        59       178        93
VIS    2025250     91400   16.7600 -112.0100       8.9        20       171        94
VIS    2025250     91400   16.7500 -112.4100      15.5        43       154        93
VIS    2025250     91400   16.7400 -112.4500      15.9        39       154        97
VIS    2025250     91400   16.7400 -112.4800      15.2        24       141       100
VIS    2025250     91400   16.7300 -112.5000      15.0        30       139       100
VIS    2025250     91400   16.7300 -112.5300      15.2        34       141       100
VIS    2025250     91400   16.7400 -112.5600      15.2        38       148        99
VIS    2025250     91400   16.7300 -112.5800      11.5        38       143        98
VIS    2025250     91400   16.7200 -112.6200      10.8        37       143        99
VIS    2025250     91400   16.7300 -112.6600      10.1        36       142       100
VIS    2025250     91400   16.7400 -112.6700      10.6        39       145        99
VIS    2025250     91400   16.7400 -112.7000      11.1        37       151        99
VIS    2025250     91400   16.7400 -112.7300      12.3        28       154        98
VIS    2025250     91400   16.7200 -112.7900      11.8        23       157        95
VIS    2025250     91400   16.7200 -112.8200      14.9        20       157       100
VIS    2025250     91400   16.7400 -112.8600      17.6        35       159        98
VIS    2025250     91400   16.7200 -112.8800      17.2        42       159       100
VIS    2025250     91400   16.7300 -112.9100      16.6        40       162       100
VIS    2025250     91400   16.7300 -112.9300      10.7        24       167        97
VIS    2025250     91400   16.7300 -112.9700      11.4        26       167        96
VIS    2025250     91400   16.7200 -113.0100      13.8        33       167       100
VIS    2025250     91400   16.7100 -113.0200      14.1        34       167       100
VIS    2025250     91400   16.7300 -113.0500      14.8        31       166        96
VIS    2025250     91400   16.7300 -113.2300      12.1        36       173        96
VIS    2025250     91400   16.7200 -113.2700      11.8        35       174       100
VIS    2025250     91400   16.7200 -113.3700      12.8        28       175       100
VIS    2025250     91400   16.7000 -113.4100       9.0        12       173        97
VIS    2025250     91400   16.7100 -113.4900      17.3        34       163       100
VIS    2025250     91400   16.7000 -113.5100      17.5        31       161        98
VIS    2025250     91400   16.7000 -113.5300      17.7        31       161        99
VIS    2025250     91400   16.7000 -113.5700      17.1        32       151        99
VIS    2025250     91400   16.7100 -113.6100      15.4        31       127       100
VIS    2025250     91400   16.7000 -113.6400      16.2        32       119        99
VIS    2025250     91400   16.7000 -113.6400      16.2        32       123        99
VIS    2025250     91400   16.7100 -113.6700      16.0        36       116        97
VIS    2025250     91400   16.7000 -113.7200      15.6        33       116        98
VIS    2025250     91400   16.6900 -113.7400      15.4        32       120        95
VIS    2025250     91400   16.7000 -113.7600      16.7        27       119        99
VIS    2025250     91400   16.7100 -113.7900      11.9        15       153        96
VIS    2025250     91400   16.7100 -113.8100      11.4        16       160        95
VIS    2025250     91400   16.7000 -113.8600      10.7       359       174       100
VIS    2025250     91400   16.6900 -113.9100      11.7         9       172       100
VIS    2025250     91400   16.7000 -113.9200      10.5         8       172        94
VIS    2025250     91400   16.7000 -113.9500      11.1        11       169        99
VIS    2025250     91400   16.7100 -114.0300      11.3        16       162        97
VIS    2025250     91400   16.6900 -114.0500      12.3        19       162       100
VIS    2025250     91400   16.6900 -114.0800      11.6        20       162        99
VIS    2025250     91400   16.6800 -114.1300      11.2        27       164        97
VIS    2025250     91400   16.6900 -114.1700      11.5        19       166        90
VIS    2025250     91400   16.6900 -114.2100      12.4        20       171       100
VIS    2025250     91400   16.7000 -114.2600      11.4        21       175       100
VIS    2025250     91400   16.6800 -114.2700      12.3        26       177       100
VIS    2025250     91400   16.7000 -114.2900      11.1        27       177        93
VIS    2025250     91400   16.6800 -114.9500      10.0        35       178       100
VIS    2025250     91400   16.6800 -114.9600      10.0        34       178        99
VIS    2025250     91400   16.6800 -115.0100      12.1        33       170        92
VIS    2025250     91400   16.6800 -115.0200      11.7        34       170        95
VIS    2025250     91400   16.6800 -115.0700      11.8        37       169        94
VIS    2025250     91400   16.6600 -115.1500       8.9        13       168        99
VIS    2025250     91400   16.6000 -118.2100      14.0        33       176        91
VIS    2025250     91400   16.5800 -118.4000       5.3        43       174        97
VIS    2025250     91400   16.5600 -119.4700      17.2        22       163       100
VIS    2025250     91400   16.5600 -119.5000      16.7        20       165       100
VIS    2025250     91400   16.5600 -119.5300      16.4        18       161       100
VIS    2025250     91400   16.5800 -119.5400      17.0        17       161       100
VIS    2025250     91400   16.7700 -110.6800       9.7        40       188        96
VIS    2025250     91400   16.7700 -110.7000      10.2        44       188        95
VIS    2025250     91400   16.7700 -110.7300      10.6        54       187        97
VIS    2025250     91400   16.7700 -110.7600       9.2        58       183        90
VIS    2025250     91400   16.7700 -110.7800       8.4        61       183       100
VIS    2025250     91400   16.7700 -110.8300      10.2        53       170        97
VIS    2025250     91400   16.7600 -110.8800      10.2        45       171        96
VIS    2025250     91400   16.7700 -110.9100       9.3        35       171        96
VIS    2025250     91400   16.7500 -110.9400       8.9        26       174        94
VIS    2025250     91400   16.7600 -110.9600       9.2        23       173        97
VIS    2025250     91400   16.7600 -110.9800       8.2        25       172       100
VIS    2025250     91400   16.7500 -111.0400      11.5        23       175        95
VIS    2025250     91400   16.7500 -111.0500      11.4        25       175        99
VIS    2025250     91400   16.7400 -111.0800      11.4        25       176        98
VIS    2025250     91400   16.7400 -111.1700      10.8        46       178        98
VIS    2025250     91400   16.7600 -111.1900      10.1        48       177        95
VIS    2025250     91400   16.7500 -111.2300       8.6        55       173        99
VIS    2025250     91400   16.7600 -111.2600       8.5        60       172       100
VIS    2025250     91400   16.7400 -111.3000       8.9        77       174        97
VIS    2025250     91400   16.7500 -111.3100       9.2        70       174        99
VIS    2025250     91400   16.7300 -111.3400       8.7        69       175        96
VIS    2025250     91400   16.7400 -111.3800       7.8        62       174        97
VIS    2025250     91400   16.7500 -111.4200       8.9        58       175        98
VIS    2025250     91400   16.7300 -111.4300       8.8        64       176        93
VIS    2025250     91400   16.7400 -111.5300       8.0        57       180        94
VIS    2025250     91400   16.7400 -111.5500       8.1        53       180        94
VIS    2025250     91400   16.7200 -111.7100       9.3        59       179       100
VIS    2025250     91400   16.7400 -111.7300      10.4        61       179        95
VIS    2025250     91400   16.7200 -111.8000      11.0        33       177        94
VIS    2025250     91400   16.7200 -112.1800       4.0        21       170        90
VIS    2025250     91400   16.7100 -112.4600      16.8        32       141        99
VIS    2025250     91400   16.7200 -112.4800      15.4        28       139        99
VIS    2025250     91400   16.7100 -112.5100      14.7        33       139       100
VIS    2025250     91400   16.7200 -112.5400      15.5        37       143        99
VIS    2025250     91400   16.7100 -112.6400      11.0        39       141        97
VIS    2025250     91400   16.7100 -112.6500      11.1        39       141        92
VIS    2025250     91400   16.7100 -112.6900      13.7        37       153        94
VIS    2025250     91400   16.7100 -112.7500      12.0        26       158        92
VIS    2025250     91400   16.7000 -112.7700      12.4        22       158        98
VIS    2025250     91400   16.6900 -112.8100      13.5        23       157        96
VIS    2025250     91400   16.7100 -112.8900      17.0        44       159       100
VIS    2025250     91400   16.7000 -112.9700      13.5        26       167        92
VIS    2025250     91400   16.7000 -113.0100      14.3        35       167       100
VIS    2025250     91400   16.6900 -113.0400      14.6        33       167        93
VIS    2025250     91400   16.6900 -113.0500      14.6        32       167        91
VIS    2025250     91400   16.7000 -113.4000       8.8        13       170        97
VIS    2025250     91400   16.6900 -113.5300      17.5        30       156        98
VIS    2025250     91400   16.6800 -113.5300      17.4        29       156        97
VIS    2025250     91400   16.6900 -113.5800      17.0        32       147        98
VIS    2025250     91400   16.6800 -113.6100      15.3        39       150       100
VIS    2025250     91400   16.6900 -113.6400      16.1        32       119        99
VIS    2025250     91400   16.6800 -113.6700      16.4        36       117       100
VIS    2025250     91400   16.6800 -113.6700      15.7        37       125        99
VIS    2025250     91400   16.6900 -113.7200      15.3        36       116        99
VIS    2025250     91400   16.6900 -113.7500      16.0        31       121       100
VIS    2025250     91400   16.6900 -113.7600      16.1        31       137        99
VIS    2025250     91400   16.6700 -113.8000      13.6        15       172       100
VIS    2025250     91400   16.6800 -113.8100      13.3        15       169       100
VIS    2025250     91400   16.6700 -113.8700      14.8         9       178        99
VIS    2025250     91400   16.6700 -113.8800      14.7         7       177       100
VIS    2025250     91400   16.6800 -113.9000      11.4         5       173        91
VIS    2025250     91400   16.6600 -113.9300      12.5         9       173       100
VIS    2025250     91400   16.6700 -113.9700      14.6        24       162       100
VIS    2025250     91400   16.6600 -113.9900      14.6        24       164       100
VIS    2025250     91400   16.6700 -114.0100      14.2        25       162       100
VIS    2025250     91400   16.6600 -114.0600      13.1        23       165        99
VIS    2025250     91400   16.6600 -114.0700      13.1        23       165        99
VIS    2025250     91400   16.6600 -114.1000      13.7        23       165       100
VIS    2025250     91400   16.6700 -114.1600      11.4        18       166       100
VIS    2025250     91400   16.6600 -114.1900      11.0        15       169       100
VIS    2025250     91400   16.6600 -114.2500      12.9        31       177        96
VIS    2025250     91400   16.6800 -114.2700      12.7        27       177       100
VIS    2025250     91400   16.6700 -114.3200      10.6        17       188        94
VIS    2025250     91400   16.6500 -114.9200      10.7        37       174        94
VIS    2025250     91400   16.6400 -114.9500      10.9        36       173        94
VIS    2025250     91400   16.6600 -115.0200      11.8        32       170        90
VIS    2025250     91400   16.6200 -116.3900       7.6        18       188        97
VIS    2025250     91400   16.5700 -118.2400       7.5        87       182        98
VIS    2025250     91400   16.5600 -118.3400      18.5       159       172       100
VIS    2025250     91400   16.5600 -118.3900       5.5        38       175        99
VIS    2025250     91400   16.5700 -118.4000       5.6        38       175       100
VIS    2025250     91400   16.5800 -118.4300       6.1        27       174        95
VIS    2025250     91400   16.5400 -119.4100      20.3        16       169        99
VIS    2025250     91400   16.5300 -119.4500      17.5        19       160       100
VIS    2025250     91400   16.5300 -119.4900      17.1        19       163        98
VIS    2025250     91400   16.5500 -119.5000      16.8        19       165       100
VIS    2025250     91400   16.5500 -119.5200      17.0        18       165       100
VIS    2025250     91400   16.5500 -119.5400      16.8        16       165       100
VIS    2025250     91400   16.7400 -110.6700       8.5        27       189        98
VIS    2025250     91400   16.7500 -110.7400      10.9        53       188        97
VIS    2025250     91400   16.7300 -110.8300      10.2        41       171       100
VIS    2025250     91400   16.7300 -110.8500      10.0        46       170        99
VIS    2025250     91400   16.7300 -110.8700       9.8        54       169        98
VIS    2025250     91400   16.7200 -110.9000       8.3        46       172        94
VIS    2025250     91400   16.7200 -110.9400       8.2        27       177        90
VIS    2025250     91400   16.7300 -110.9700       9.2        23       177        94
VIS    2025250     91400   16.7400 -110.9900       9.1        22       174        99
VIS    2025250     91400   16.7200 -111.0400       6.7        59       176        91
VIS    2025250     91400   16.7400 -111.0700      11.4        25       176        98
VIS    2025250     91400   16.7100 -111.2100       8.4        54       174        97
VIS    2025250     91400   16.7300 -111.2300       7.8        57       172        98
VIS    2025250     91400   16.7300 -111.2700       8.3        71       174        98
VIS    2025250     91400   16.7300 -111.3000       8.8        77       177        99
VIS    2025250     91400   16.7100 -111.3200       8.6        82       178       100
VIS    2025250     91400   16.7300 -111.3600       7.7        64       176        91
VIS    2025250     91400   16.7300 -111.3900       7.9        60       175        97
VIS    2025250     91400   16.7200 -111.4100       8.3        58       176       100
VIS    2025250     91400   16.7100 -111.4500       8.6        64       177        96
VIS    2025250     91400   16.7100 -111.4900       8.4        58       181        93
VIS    2025250     91400   16.7100 -111.5200       8.7        55       181        97
VIS    2025250     91400   16.7100 -111.5500       9.0        54       179       100
VIS    2025250     91400   16.7000 -111.7200       8.5        53       182        97
VIS    2025250     91400   16.7200 -111.7200       9.0        61       182        98
VIS    2025250     91400   16.6900 -112.4600      16.2        33       138        99
VIS    2025250     91400   16.6800 -112.4900      15.0        32       137        99
VIS    2025250     91400   16.7000 -112.5300      14.5        39       138       100
VIS    2025250     91400   16.6800 -112.5300      15.6        40       138        97
VIS    2025250     91400   16.6800 -112.5800      13.6        48       141        95
VIS    2025250     91400   16.6800 -112.6100      10.2        47       138        92
VIS    2025250     91400   16.6900 -112.6400      11.1        40       141        98
VIS    2025250     91400   16.6800 -112.6600      11.7        39       143        99
VIS    2025250     91400   16.6700 -112.7500      13.8        34       158        97
VIS    2025250     91400   16.6800 -112.7900      13.7        20       157        99
VIS    2025250     91400   16.6800 -112.8000      12.9        20       157        99
VIS    2025250     91400   16.6900 -112.8800      17.0        50       156        93
VIS    2025250     91400   16.6800 -112.9100      17.0        50       158        94
VIS    2025250     91400   16.6700 -112.9400      16.8        48       159        98
VIS    2025250     91400   16.6700 -112.9700      15.1        32       162        96
VIS    2025250     91400   16.6600 -113.0100      14.9        33       166        96
VIS    2025250     91400   16.6600 -113.0400      14.4        31       167        96
VIS    2025250     91400   16.6700 -113.0700      12.3        25       171        94
VIS    2025250     91400   16.6600 -113.5800      14.5        36       159        96
VIS    2025250     91400   16.6700 -113.6100      14.8        39       150        98
VIS    2025250     91400   16.6700 -113.6400      15.4        39       150        96
VIS    2025250     91400   16.6700 -113.6500      15.4        39       150        97
VIS    2025250     91400   16.6500 -113.7000      15.3        32       163        99
VIS    2025250     91400   16.6500 -113.7100      15.9        32       163       100
VIS    2025250     91400   16.6600 -113.7500      15.3        29       162        99
VIS    2025250     91400   16.6600 -113.7800      14.6        22       169        99
VIS    2025250     91400   16.6600 -113.7900      13.9        16       172        99
VIS    2025250     91400   16.6500 -113.8300      14.6        15       178       100
VIS    2025250     91400   16.6500 -113.8700      14.9         9       179       100
VIS    2025250     91400   16.6500 -113.8900      14.9         6       178       100
VIS    2025250     91400   16.6500 -113.9100      13.5         5       175        98
VIS    2025250     91400   16.6400 -113.9600      15.3        21       165       100
VIS    2025250     91400   16.6500 -113.9600      15.2        23       164        99
VIS    2025250     91400   16.6600 -113.9900      14.6        24       164       100
VIS    2025250     91400   16.6400 -114.0400      13.3        29       165        92
VIS    2025250     91400   16.6600 -114.0700      13.1        23       165        98
VIS    2025250     91400   16.6600 -114.0800      13.1        23       165        98
VIS    2025250     91400   16.6300 -114.1500      14.1        22       171        99
VIS    2025250     91400   16.6500 -114.1600      12.4        20       169        94
VIS    2025250     91400   16.6400 -114.2500      12.7        32       175       100
VIS    2025250     91400   16.6500 -114.2800      12.5        30       177       100
VIS    2025250     91400   16.6400 -114.3000      11.7        23       190        97
VIS    2025250     91400   16.6100 -114.9000      13.9        38       173        91
VIS    2025250     91400   16.6200 -114.9400      11.7        33       173        92
VIS    2025250     91400   16.6200 -115.0300      14.7        20       168        92
VIS    2025250     91400   16.5600 -117.7900       8.0       352       186        92
VIS    2025250     91400   16.5500 -118.3400      19.1       159       173       100
VIS    2025250     91400   16.5200 -119.3800      20.3        10       173        98
VIS    2025250     91400   16.5200 -119.4100      18.4        12       168       100
VIS    2025250     91400   16.5200 -119.4300      17.5        15       160       100
VIS    2025250     91400   16.5300 -119.4500      17.6        18       160       100
VIS    2025250     91400   16.5300 -119.4800      17.3        18       163        98
VIS    2025250     91400   16.5100 -119.5000      17.7        16       165       100
VIS    2025250     91400   16.5300 -119.5300      17.1        18       169        99
VIS    2025250     91400   16.7000 -110.8100       9.5        37       177        90
VIS    2025250     91400   16.7100 -110.8100       9.9        40       177        99
VIS    2025250     91400   16.7000 -110.8500      10.3        44       174       100
VIS    2025250     91400   16.7000 -111.0100       9.5        53       180        94
VIS    2025250     91400   16.6900 -111.0400       7.1        59       176        91
VIS    2025250     91400   16.7000 -111.0500       6.5        63       176        94
VIS    2025250     91400   16.7000 -111.2300       5.7        64       172        91
VIS    2025250     91400   16.7000 -111.2900       7.9        82       179       100
VIS    2025250     91400   16.6800 -111.3600       7.6        57       178       100
VIS    2025250     91400   16.6800 -111.4000       7.9        61       178       100
VIS    2025250     91400   16.6900 -111.4200       8.1        58       176       100
VIS    2025250     91400   16.6800 -111.4400       8.2        61       177        99
VIS    2025250     91400   16.7000 -111.4600       8.6        60       177        98
VIS    2025250     91400   16.6900 -111.4900       8.7        58       181        97
VIS    2025250     91400   16.6800 -111.5300       9.1        58       179       100
VIS    2025250     91400   16.6800 -111.5500       9.4        57       178        99
VIS    2025250     91400   16.6900 -111.7000       8.8        52       183        93
VIS    2025250     91400   16.6700 -111.7300       8.4        55       183        92
VIS    2025250     91400   16.6800 -112.1000       7.9        58       175       100
VIS    2025250     91400   16.6600 -112.2500       9.1        51       162        96
VIS    2025250     91400   16.6700 -112.4700      15.1        31       138        99
VIS    2025250     91400   16.6600 -112.4900      14.6        31       137        98
VIS    2025250     91400   16.6700 -112.5100      14.7        33       137       100
VIS    2025250     91400   16.6500 -112.5600      15.0        47       137        97
VIS    2025250     91400   16.6500 -112.5900      15.1        48       141        97
VIS    2025250     91400   16.6500 -112.6200      15.4        37       137        99
VIS    2025250     91400   16.6600 -112.6800      16.6        32       153        93
VIS    2025250     91400   16.6500 -112.7600      13.2        31       158        99
VIS    2025250     91400   16.6500 -112.7800      13.2        28       157        95
VIS    2025250     91400   16.6600 -112.9500      15.3        33       161        91
VIS    2025250     91400   16.6600 -112.9900      15.1        32       162        90
VIS    2025250     91400   16.6400 -113.0200      13.0        35       165        94
VIS    2025250     91400   16.6500 -113.0400      14.4        31       167        98
VIS    2025250     91400   16.6500 -113.1400      10.1        14       172        90
VIS    2025250     91400   16.6300 -113.2500      17.8        38       165        99
VIS    2025250     91400   16.6300 -113.2600      17.8        38       165        99
VIS    2025250     91400   16.6300 -113.4200      13.9        39       166        99
VIS    2025250     91400   16.6300 -113.5200       9.5        16       163        98
VIS    2025250     91400   16.6200 -113.5500      11.2        18       161        92
VIS    2025250     91400   16.6300 -113.5800      12.6        23       161        99
VIS    2025250     91400   16.6400 -113.6000      13.7        38       156       100
VIS    2025250     91400   16.6400 -113.7200      15.9        31       168       100
VIS    2025250     91400   16.6200 -113.7400      14.8        31       171       100
VIS    2025250     91400   16.6300 -113.7900      14.5        23       175       100
VIS    2025250     91400   16.6400 -113.8100      14.5        17       177       100
VIS    2025250     91400   16.6300 -113.8400      14.8        13       178       100
VIS    2025250     91400   16.6300 -113.8500      15.0        11       178       100
VIS    2025250     91400   16.6400 -113.8900      14.6         7       178        99
VIS    2025250     91400   16.6200 -113.9100      13.0         7       175        94
VIS    2025250     91400   16.6300 -113.9500      15.9        20       166       100
VIS    2025250     91400   16.6300 -113.9800      14.6        23       164        99
VIS    2025250     91400   16.6300 -114.0000      14.4        24       162        98
VIS    2025250     91400   16.6100 -114.2000      12.9        25       172       100
VIS    2025250     91400   16.6100 -114.2700      14.2        23       183        99
VIS    2025250     91400   16.6200 -114.2900      13.4        23       188        99
VIS    2025250     91400   16.6200 -114.3100      12.2        20       189        99
VIS    2025250     91400   16.5900 -114.9700      11.0        10       169        93
VIS    2025250     91400   16.5900 -115.1000      10.2        19       168        98
VIS    2025250     91400   16.6000 -115.1400       9.2        13       168       100
VIS    2025250     91400   16.5900 -115.1400      10.0        14       168       100
VIS    2025250     91400   16.5700 -115.7100      11.2        44       183        97
VIS    2025250     91400   16.5700 -115.7300      11.3        40       185        93
VIS    2025250     91400   16.5700 -116.0200       4.8        40       185        90
VIS    2025250     91400   16.5400 -117.6500      11.8        24       182        99
VIS    2025250     91400   16.5400 -117.6800      11.6        18       182        98
VIS    2025250     91400   16.5200 -117.6900      11.9        11       182        98
VIS    2025250     91400   16.4900 -119.3800      18.0         8       173        97
VIS    2025250     91400   16.5100 -119.4100      17.5        12       163       100
VIS    2025250     91400   16.5000 -119.4200      16.8        15       162        99
VIS    2025250     91400   16.4900 -119.4700      18.2        17       164       100
VIS    2025250     91400   16.5000 -119.4800      18.2        16       165       100
VIS    2025250     91400   16.5000 -119.5400      17.7        11       176       100
VIS    2025250     91400   16.6900 -110.8400      10.1        44       175        97
VIS    2025250     91400   16.6800 -110.9900       8.9        55       181        97
VIS    2025250     91400   16.6800 -111.0100       9.5        52       180        98
VIS    2025250     91400   16.6900 -111.0400       7.3        57       177        92
VIS    2025250     91400   16.6700 -111.1300       8.7        52       178        95
VIS    2025250     91400   16.6700 -111.2000       9.4        57       178        91
VIS    2025250     91400   16.6800 -111.3100       7.3        89       179        95
VIS    2025250     91400   16.6600 -111.3600       8.0        61       179       100
VIS    2025250     91400   16.6600 -111.4000       8.2        62       179        99
VIS    2025250     91400   16.6700 -111.4100       8.1        62       178       100
VIS    2025250     91400   16.6600 -111.4500       8.1        62       179        98
VIS    2025250     91400   16.6600 -111.4700       8.1        62       174        98
VIS    2025250     91400   16.6600 -111.5200       8.6        59       179       100
VIS    2025250     91400   16.6600 -111.5300       8.6        59       179       100
VIS    2025250     91400   16.6500 -111.5800       9.7        61       183        91
VIS    2025250     91400   16.6600 -111.6900       8.1        56       182        97
VIS    2025250     91400   16.6600 -111.7100       8.2        57       182        96
VIS    2025250     91400   16.6400 -111.9100      11.0        46       176       100
VIS    2025250     91400   16.6300 -112.3100       9.8        40       158        96
VIS    2025250     91400   16.6400 -112.4200       8.5        12       149        91
VIS    2025250     91400   16.6400 -112.4400       8.4        11       146        96
VIS    2025250     91400   16.6500 -112.4800      14.2        31       139        98
VIS    2025250     91400   16.6400 -112.5000      14.1        32       140        99
VIS    2025250     91400   16.6300 -112.5200      13.6        34       140        98
VIS    2025250     91400   16.6400 -112.5400      15.4        40       138        90
VIS    2025250     91400   16.6500 -112.5900      15.1        47       139        91
VIS    2025250     91400   16.6200 -112.6500      18.1        31       143       100
VIS    2025250     91400   16.6300 -112.6600      17.8        30       143       100
VIS    2025250     91400   16.6400 -112.7100      14.8        36       158       100
VIS    2025250     91400   16.6300 -112.7400      13.3        35       158       100
VIS    2025250     91400   16.6200 -112.7600      12.1        34       158        97
VIS    2025250     91400   16.6200 -112.9300      16.9        36       159        96
VIS    2025250     91400   16.6200 -112.9600      16.9        36       160        97
VIS    2025250     91400   16.6300 -112.9700      12.5        36       161        91
VIS    2025250     91400   16.6300 -113.0200      13.1        34       165        97
VIS    2025250     91400   16.6200 -113.0400      13.8        33       166        99
VIS    2025250     91400   16.6300 -113.1300       9.5        20       172        92
VIS    2025250     91400   16.6300 -113.1600      10.0        13       172        96
VIS    2025250     91400   16.6100 -113.1800       9.7        16       171       100
VIS    2025250     91400   16.6100 -113.2300      17.7        36       166       100
VIS    2025250     91400   16.6200 -113.2300      17.7        36       166       100
VIS    2025250     91400   16.6100 -113.2800      17.8        37       165        99
VIS    2025250     91400   16.6200 -113.4200      14.1        39       166        99
VIS    2025250     91400   16.6200 -113.4400      14.1        40       166       100
VIS    2025250     91400   16.6000 -113.5100       7.4        13       167       100
VIS    2025250     91400   16.6200 -113.5200       8.6        16       165        97
VIS    2025250     91400   16.6200 -113.5400      10.5        17       162        90
VIS    2025250     91400   16.6000 -113.6300      10.1        46       166       100
VIS    2025250     91400   16.6200 -113.6300      11.2        18       161        91
VIS    2025250     91400   16.6200 -113.6700       8.2        33       165        98
VIS    2025250     91400   16.6000 -113.7100       9.2        34       170       100
VIS    2025250     91400   16.6000 -113.7200       9.7        34       171        99
VIS    2025250     91400   16.6100 -113.7500      13.6        31       172       100
VIS    2025250     91400   16.6100 -113.7800      13.7        25       175       100
VIS    2025250     91400   16.6000 -113.8200      14.5        20       176        98
VIS    2025250     91400   16.6100 -113.8300      14.9        18       177        98
VIS    2025250     91400   16.6000 -113.8600      15.3        14       178       100
VIS    2025250     91400   16.6100 -113.9100      13.0         7       176        97
VIS    2025250     91400   16.6000 -113.9600      14.5        22       164        94
VIS    2025250     91400   16.6100 -113.9700      14.2        23       164        96
VIS    2025250     91400   16.5900 -114.0000      13.3        26       165        95
VIS    2025250     91400   16.5900 -114.2500      15.4        12       183        99
VIS    2025250     91400   16.5900 -114.2600      15.4        13       183        99
VIS    2025250     91400   16.6000 -114.2800      14.3        22       183        99
VIS    2025250     91400   16.5700 -114.9200      12.3        19       168        93
VIS    2025250     91400   16.5600 -114.9500      11.3        12       169       100
VIS    2025250     91400   16.5800 -115.1300      10.2        15       169       100
VIS    2025250     91400   16.5700 -115.7100      11.3        45       183        98
VIS    2025250     91400   16.5500 -115.7500      11.4        39       178        95
VIS    2025250     91400   16.5400 -115.7800      11.2        37       178        99
VIS    2025250     91400   16.5500 -115.7800      11.0        38       178        99
VIS    2025250     91400   16.5200 -117.6400      13.0        26       184        98
VIS    2025250     91400   16.5100 -117.6800      11.8        10       179        96
VIS    2025250     91400   16.5000 -117.6900      11.7        10       172        97
VIS    2025250     91400   16.5000 -117.7700      10.1        16       185        90
VIS    2025250     91400   16.5000 -117.8000       9.7        10       185        91
VIS    2025250     91400   16.4900 -118.2100       8.0       107       182        94
VIS    2025250     91400   16.4900 -118.2400       6.0       116       182        91
VIS    2025250     91400   16.4600 -119.3700      16.7         8       174        94
VIS    2025250     91400   16.4800 -119.3800      17.9         8       174        96
VIS    2025250     91400   16.4700 -119.4200      16.2        24       169        97
VIS    2025250     91400   16.4800 -119.4300      16.6        21       166        99
VIS    2025250     91400   16.4800 -119.4500      16.4        23       165        96
VIS    2025250     91400   16.6600 -110.8200       8.7        59       177        99
VIS    2025250     91400   16.6600 -110.8200       8.8        58       177        99
VIS    2025250     91400   16.6500 -110.8900       8.4        36       179        97
VIS    2025250     91400   16.6500 -111.0300       8.6        53       179        94
VIS    2025250     91400   16.6600 -111.0300       8.8        52       177        92
VIS    2025250     91400   16.6600 -111.1400       8.4        52       178        98
VIS    2025250     91400   16.6400 -111.1500       8.4        50       178        96
VIS    2025250     91400   16.6400 -111.1900       8.7        52       180       100
VIS    2025250     91400   16.6400 -111.2300       8.9        56       181        99
VIS    2025250     91400   16.6500 -111.2900       6.3        77       179        94
VIS    2025250     91400   16.6400 -111.3200       6.2        76       183        96
VIS    2025250     91400   16.6300 -111.3500       7.5        67       182        96
VIS    2025250     91400   16.6500 -111.3700       8.0        62       179       100
VIS    2025250     91400   16.6400 -111.4100       8.4        62       179        99
VIS    2025250     91400   16.6400 -111.4100       8.3        62       179        99
VIS    2025250     91400   16.6500 -111.4500       8.2        61       179        98
VIS    2025250     91400   16.6500 -111.4800       8.2        61       179        97
VIS    2025250     91400   16.6500 -111.5200       7.9        58       179        99
VIS    2025250     91400   16.6300 -111.5400       7.3        54       179        90
VIS    2025250     91400   16.6400 -111.7000       9.0        50       182        92
VIS    2025250     91400   16.6400 -111.8200       9.6        65       177        98
VIS    2025250     91400   16.6200 -111.8500       9.6        51       174        99
VIS    2025250     91400   16.6300 -111.8600       9.7        50       175        97
VIS    2025250     91400   16.6400 -111.8800      10.9        47       176       100
VIS    2025250     91400   16.6200 -111.9200      10.9        46       175        99
VIS    2025250     91400   16.6300 -111.9400      12.5        45       176       100
VIS    2025250     91400   16.6200 -111.9800      13.2        47       176        99
VIS    2025250     91400   16.6100 -112.4500      12.5        30       146        95
VIS    2025250     91400   16.6200 -112.4800      13.8        32       142        99
VIS    2025250     91400   16.6200 -112.5100      14.0        34       140        96
VIS    2025250     91400   16.6100 -112.5300      14.6        36       140        99
VIS    2025250     91400   16.6100 -112.5700      15.8        36       138        93
VIS    2025250     91400   16.6200 -112.5900      15.9        35       137        97
VIS    2025250     91400   16.6100 -112.6200      16.7        35       139       100
VIS    2025250     91400   16.6000 -112.6500      18.0        32       142       100
VIS    2025250     91400   16.6200 -112.6600      18.1        30       143       100
VIS    2025250     91400   16.6200 -112.7000      16.7        33       158        99
VIS    2025250     91400   16.6000 -112.7500      12.3        37       158       100
VIS    2025250     91400   16.6200 -112.7800      11.6        34       157        91
VIS    2025250     91400   16.6100 -112.9500      16.9        36       159        96
VIS    2025250     91400   16.6000 -113.0100      12.5        36       163       100
VIS    2025250     91400   16.6100 -113.0300      14.2        33       165        99
VIS    2025250     91400   16.5900 -113.0900      15.4        23       170        98
VIS    2025250     91400   16.6100 -113.1400       9.5        20       172       100
VIS    2025250     91400   16.6000 -113.2600      17.7        37       165       100
VIS    2025250     91400   16.6000 -113.2700      17.8        37       165       100
VIS    2025250     91400   16.6000 -113.2900      17.8        37       165        99
VIS    2025250     91400   16.5900 -113.4200      14.2        40       166       100
VIS    2025250     91400   16.6000 -113.4400      14.1        40       166        99
VIS    2025250     91400   16.5900 -113.4800       7.0        18       167        98
VIS    2025250     91400   16.6000 -113.5000       7.2        14       167       100
VIS    2025250     91400   16.5900 -113.5900      13.2         9       161        94
VIS    2025250     91400   16.5700 -113.6100      19.0        29       164       100
VIS    2025250     91400   16.5900 -113.6300      10.1        45       166       100
VIS    2025250     91400   16.5900 -113.7100       9.3        33       171       100
VIS    2025250     91400   16.5800 -113.7300      12.3        33       171       100
VIS    2025250     91400   16.5800 -113.7700      12.7        28       173       100
VIS    2025250     91400   16.5800 -113.7800      12.9        26       174        99
VIS    2025250     91400   16.5900 -113.8200      14.2        21       176        97
VIS    2025250     91400   16.5800 -113.8600      15.5        21       177       100
VIS    2025250     91400   16.5700 -113.8800      16.1        17       174        99
VIS    2025250     91400   16.5700 -113.8900      17.0        18       172       100
VIS    2025250     91400   16.5800 -114.0000      13.4        27       165        92
VIS    2025250     91400   16.5800 -114.0000      13.4        27       165        93
VIS    2025250     91400   16.5700 -114.2000      10.9        16       179        99
VIS    2025250     91400   16.5700 -114.2700      16.3        37       180        98
VIS    2025250     91400   16.5600 -114.2900      16.6        36       177        99
VIS    2025250     91400   16.5600 -114.8900      12.3        23       172        96
VIS    2025250     91400   16.5500 -115.0300      12.0         1       171        94
VIS    2025250     91400   16.5400 -115.0700      12.5        24       170       100
VIS    2025250     91400   16.5400 -115.6800      12.7        49       179       100
VIS    2025250     91400   16.5300 -115.7100      13.4        45       172        97
VIS    2025250     91400   16.5200 -115.7400      10.9        44       171        97
VIS    2025250     91400   16.5300 -115.7800      11.1        38       178        99
VIS    2025250     91400   16.5300 -115.7900      11.1        37       178        99
VIS    2025250     91400   16.5200 -115.8200       9.8        36       178        96
VIS    2025250     91400   16.4800 -117.6400      10.1       332       188        92
VIS    2025250     91400   16.4700 -117.7400       5.5        32       184        98
VIS    2025250     91400   16.4900 -117.7600      10.3        15       185        93
VIS    2025250     91400   16.4900 -117.7700      10.3        15       185        94
VIS    2025250     91400   16.4700 -118.2100       7.4       112       182        92
VIS    2025250     91400   16.4800 -118.2400       6.0       115       182        95
VIS    2025250     91400   16.4800 -118.2700       5.8       117       182        97
VIS    2025250     91400   16.4400 -119.4100      17.0        26       172        94
VIS    2025250     91400   16.4500 -119.4200      16.6        27       168        98
VIS    2025250     91400   16.6400 -110.5600       4.0       351       190        99
VIS    2025250     91400   16.6300 -110.8100       9.0        55       177        90
VIS    2025250     91400   16.6200 -110.8400       8.7        50       180        96
VIS    2025250     91400   16.6400 -110.8800       8.5        37       180        95
VIS    2025250     91400   16.6200 -110.8900       8.9        35       180        94
VIS    2025250     91400   16.6200 -110.9600       8.1        52       179        91
VIS    2025250     91400   16.6200 -111.0000       7.0        54       182        98
VIS    2025250     91400   16.6300 -111.0100       7.1        58       180       100
VIS    2025250     91400   16.6400 -111.0400       9.0        51       179        99
VIS    2025250     91400   16.6300 -111.1100       8.6        47       178        99
VIS    2025250     91400   16.6200 -111.2100       7.9        56       180        97
VIS    2025250     91400   16.6300 -111.2100       7.8        56       180        98
VIS    2025250     91400   16.6200 -111.3000       6.6        75       184        99
VIS    2025250     91400   16.6300 -111.3500       7.7        68       182        96
VIS    2025250     91400   16.6200 -111.3600       7.9        69       182        97
VIS    2025250     91400   16.6300 -111.4100       8.4        63       181        99
VIS    2025250     91400   16.6100 -111.4200       8.5        59       181       100
VIS    2025250     91400   16.6100 -111.4600       8.8        55       181        99
VIS    2025250     91400   16.6200 -111.5000       9.4        50       180       100
VIS    2025250     91400   16.6100 -111.5300      10.4        44       183        98
VIS    2025250     91400   16.6100 -111.7500       9.4        47       182        90
VIS    2025250     91400   16.6100 -111.8800      10.2        46       174       100
VIS    2025250     91400   16.6200 -111.8800      10.3        47       174       100
VIS    2025250     91400   16.6100 -111.9300      11.8        44       175       100
VIS    2025250     91400   16.6000 -111.9700      13.0        46       175        93
VIS    2025250     91400   16.6000 -111.9900      10.9        46       171        97
VIS    2025250     91400   16.5900 -112.0200      10.3        48       171        97
VIS    2025250     91400   16.5800 -112.3700      12.2        26       151        99
VIS    2025250     91400   16.6000 -112.4000      11.4        22       151        90
VIS    2025250     91400   16.5900 -112.4500      13.3        27       147        99
VIS    2025250     91400   16.6000 -112.4800      13.6        33       143        98
VIS    2025250     91400   16.6000 -112.5000      14.2        35       143        99
VIS    2025250     91400   16.5800 -112.5300      14.9        35       146        98
VIS    2025250     91400   16.5800 -112.5800      14.8        35       141        91
VIS    2025250     91400   16.5800 -112.5800      14.9        36       141        92
VIS    2025250     91400   16.5800 -112.6400      16.4        34       150        96
VIS    2025250     91400   16.5800 -112.6400      16.6        33       149        94
VIS    2025250     91400   16.5800 -112.8000      13.7        38       157        96
VIS    2025250     91400   16.5700 -112.8400      15.4        41       157        98
VIS    2025250     91400   16.5800 -112.8400      15.6        41       157        94
VIS    2025250     91400   16.5800 -113.0800      15.5        23       169        99
VIS    2025250     91400   16.5600 -113.1200      11.5         6       166        98
VIS    2025250     91400   16.5700 -113.1500      10.2         7       163        93
VIS    2025250     91400   16.5600 -113.2300      13.4        35       165       100
VIS    2025250     91400   16.5700 -113.2500      13.3        36       165       100
VIS    2025250     91400   16.5500 -113.6000      19.0        29       164       100
VIS    2025250     91400   16.5700 -113.6100      19.0        29       164       100
VIS    2025250     91400   16.5700 -113.7200      12.8        31       170        99
VIS    2025250     91400   16.5600 -113.8000      13.0        21       173        94
VIS    2025250     91400   16.5600 -113.8500      15.8        23       177       100
VIS    2025250     91400   16.5500 -113.8800      15.9        21       175       100
VIS    2025250     91400   16.5400 -113.9000      16.4        19       174        99
VIS    2025250     91400   16.5400 -114.0000      14.0        30       167        99
VIS    2025250     91400   16.5400 -114.0100      15.1        30       167       100
VIS    2025250     91400   16.5400 -114.0400      15.7        31       172       100
VIS    2025250     91400   16.5400 -114.1100       8.8        62       172       100
VIS    2025250     91400   16.5400 -114.2800      16.1        36       177        99
VIS    2025250     91400   16.5400 -114.2900      16.6        36       177        99
VIS    2025250     91400   16.5100 -115.6500      13.2        47       174       100
VIS    2025250     91400   16.5200 -115.6900      13.2        48       175        95
VIS    2025250     91400   16.5100 -115.7300      10.7        46       168        96
VIS    2025250     91400   16.5200 -115.7300      11.0        44       171        93
VIS    2025250     91400   16.5100 -115.7600      10.2        45       174       100
VIS    2025250     91400   16.5000 -115.8100      10.2        36       172        95
VIS    2025250     91400   16.4900 -115.8400      11.5        44       170        93
VIS    2025250     91400   16.4900 -115.8600      11.4        45       173        98
VIS    2025250     91400   16.4900 -115.9400      11.1        49       177       100
VIS    2025250     91400   16.5000 -115.9600      11.1        49       169       100
VIS    2025250     91400   16.5000 -116.0500       7.7        24       178        95
VIS    2025250     91400   16.4900 -116.0900      11.1        42       178        96
VIS    2025250     91400   16.5000 -116.1000      11.2        40       184        93
VIS    2025250     91400   16.4700 -117.8000       9.7        17       185        90
VIS    2025250     91400   16.4400 -117.9600       4.1        33       179       100
VIS    2025250     91400   16.4400 -117.9900       4.1        33       179       100
VIS    2025250     91400   16.4500 -117.9900       4.0        34       179       100
VIS    2025250     91400   16.4600 -118.2300       6.6       111       182        93
VIS    2025250     91400   16.4600 -118.2300       6.3       111       182        99
VIS    2025250     91400   16.4500 -118.2700       5.6       110       184        90
VIS    2025250     91400   16.4500 -118.3200       6.9        76       176       100
VIS    2025250     91400   16.4300 -119.4000      17.0        25       172        94
VIS    2025250     91400   16.6100 -110.8300       9.6        51       179        91
VIS    2025250     91400   16.6100 -110.8400       9.7        50       179        92
VIS    2025250     91400   16.6200 -110.8900       8.9        36       180        94
VIS    2025250     91400   16.6100 -110.9200       9.4        42       183        91
VIS    2025250     91400   16.6200 -110.9500       8.7        50       182        92
VIS    2025250     91400   16.6000 -110.9800       7.7        53       183       100
VIS    2025250     91400   16.6100 -111.0000       6.8        52       182       100
VIS    2025250     91400   16.5900 -111.0300       6.7        52       179        99
VIS    2025250     91400   16.6100 -111.0500       7.7        56       179       100
VIS    2025250     91400   16.5900 -111.1000       7.0        53       177        98
VIS    2025250     91400   16.5900 -111.2400       8.7        49       179        99
VIS    2025250     91400   16.5900 -111.3000       7.7        62       186        98
VIS    2025250     91400   16.5900 -111.3300       7.5        66       185       100
VIS    2025250     91400   16.6100 -111.3400       7.4        69       183        99
VIS    2025250     91400   16.6000 -111.3800       8.1        70       181        96
VIS    2025250     91400   16.6000 -111.4200       8.5        60       181       100
VIS    2025250     91400   16.6000 -111.4200       8.5        58       181       100
VIS    2025250     91400   16.6000 -111.4600       8.8        55       181        99
VIS    2025250     91400   16.6000 -111.5000       9.8        47       184        99
VIS    2025250     91400   16.5800 -111.5300       9.7        45       183        99
VIS    2025250     91400   16.5800 -111.5500       9.4        50       183        96
VIS    2025250     91400   16.5900 -111.5800       9.3        60       183        96
VIS    2025250     91400   16.5800 -111.7300      10.1        51       180        99
VIS    2025250     91400   16.5700 -111.7500       9.9        50       180       100
VIS    2025250     91400   16.5900 -111.7700      10.2        48       179        99
VIS    2025250     91400   16.5900 -111.8800      10.4        45       174        99
VIS    2025250     91400   16.5800 -111.9000      10.3        41       176        97
VIS    2025250     91400   16.5700 -111.9300      10.0        36       176        97
VIS    2025250     91400   16.5800 -111.9500       9.9        46       175        97
VIS    2025250     91400   16.5700 -112.0000      10.2        47       172       100
VIS    2025250     91400   16.5800 -112.0100      10.2        47       172       100
VIS    2025250     91400   16.5700 -112.0900       8.1        69       172        91
VIS    2025250     91400   16.5700 -112.1100       8.5        75       168       100
VIS    2025250     91400   16.5700 -112.1400       7.3        19       165        94
VIS    2025250     91400   16.5600 -112.3200      11.1         9       159        91
VIS    2025250     91400   16.5800 -112.3700      12.1        26       151        98
VIS    2025250     91400   16.5600 -112.4100      13.2        30       154       100
VIS    2025250     91400   16.5700 -112.4200      13.3        25       151        98
VIS    2025250     91400   16.5800 -112.4500      13.6        26       148       100
VIS    2025250     91400   16.5700 -112.4700      13.7        29       147       100
VIS    2025250     91400   16.5600 -112.5100      13.8        35       147        96
VIS    2025250     91400   16.5700 -112.5500      14.4        34       144        98
VIS    2025250     91400   16.5700 -112.5700      14.4        34       141        95
VIS    2025250     91400   16.5600 -112.6100      17.0        35       150       100
VIS    2025250     91400   16.5700 -112.6300      17.6        33       150       100
VIS    2025250     91400   16.5500 -112.7500      17.0        34       158        99
VIS    2025250     91400   16.5600 -112.8000      14.6        36       158       100
VIS    2025250     91400   16.5600 -112.8400      15.4        41       157        99
VIS    2025250     91400   16.5600 -112.8400      15.4        42       157        99
VIS    2025250     91400   16.5400 -112.8800      15.7        41       158        98
VIS    2025250     91400   16.5500 -112.9300      15.0        47       160        92
VIS    2025250     91400   16.5400 -112.9300      15.1        47       162        97
VIS    2025250     91400   16.5600 -113.1200      11.9         8       168        97
VIS    2025250     91400   16.5600 -113.1400      11.4         7       163        99
VIS    2025250     91400   16.5500 -113.2000      13.5        40       165        99
VIS    2025250     91400   16.5500 -113.2400      13.4        36       164       100
VIS    2025250     91400   16.5500 -113.4300      19.4        49       168        92
VIS    2025250     91400   16.5500 -113.5700      10.6        10       165        95
VIS    2025250     91400   16.5400 -113.5900      11.0        32       165        91
VIS    2025250     91400   16.5200 -113.6400      11.6        28       171        96
VIS    2025250     91400   16.5300 -113.6500      11.3        28       171        90
VIS    2025250     91400   16.5300 -113.7300       9.8        29       168        97
VIS    2025250     91400   16.5300 -113.7700      15.7        33       171        91
VIS    2025250     91400   16.5400 -113.8100      16.8        24       173        91
VIS    2025250     91400   16.5200 -113.8200      16.3        31       172        98
VIS    2025250     91400   16.5200 -113.9100      10.9        24       170        96
VIS    2025250     91400   16.5300 -114.0000      13.7        32       167        97
VIS    2025250     91400   16.5300 -114.0200      14.7        32       172       100
VIS    2025250     91400   16.5300 -114.0500      16.2        35       173       100
VIS    2025250     91400   16.5300 -114.1300       8.7        64       172       100
VIS    2025250     91400   16.5200 -114.2900      16.7        36       177        99
VIS    2025250     91400   16.5000 -114.9700      12.2        13       168        96
VIS    2025250     91400   16.4900 -115.0100      17.6        18       171        97
VIS    2025250     91400   16.4700 -115.8100      11.2        46       170        99
VIS    2025250     91400   16.4800 -115.8200      10.9        43       170        99
VIS    2025250     91400   16.4800 -115.8500      11.4        45       170        97
VIS    2025250     91400   16.4900 -115.9100      10.3        41       174        98
VIS    2025250     91400   16.4900 -115.9400      11.6        50       177       100
VIS    2025250     91400   16.4700 -116.0400       9.5        28       174        96
VIS    2025250     91400   16.4700 -116.0900      11.0        41       177        98
VIS    2025250     91400   16.4600 -116.1200      11.9        47       178       100
VIS    2025250     91400   16.4800 -116.1300      12.2        43       181       100
VIS    2025250     91400   16.4600 -116.2600      11.5        55       182        95
VIS    2025250     91400   16.4400 -117.6500       8.4       355       188        95
VIS    2025250     91400   16.4300 -117.7700      10.0        20       187        96
VIS    2025250     91400   16.4200 -117.9600       4.1        32       179       100
VIS    2025250     91400   16.4300 -117.9800       4.1        33       179       100
VIS    2025250     91400   16.4300 -118.3200       7.5        67       182        93
VIS    2025250     91400   16.3900 -119.3400      19.7        42       170        98
VIS    2025250     91400   16.3900 -119.3500      19.5        40       170        96
VIS    2025250     91400   16.5900 -110.7300       8.2        30       191        96
VIS    2025250     91400   16.5800 -110.8300       9.2        45       181        92
VIS    2025250     91400   16.5900 -110.8400       9.3        45       181        94
VIS    2025250     91400   16.5800 -110.9200       9.5        57       186        95
VIS    2025250     91400   16.5700 -110.9500       9.2        56       186        98
VIS    2025250     91400   16.5800 -110.9800       8.2        57       182        99
VIS    2025250     91400   16.5700 -111.0000       7.7        56       180        98
VIS    2025250     91400   16.5700 -111.0700       7.1        53       178       100
VIS    2025250     91400   16.5900 -111.0900       7.0        49       177        96
VIS    2025250     91400   16.5900 -111.1100       8.1        65       180        97
VIS    2025250     91400   16.5700 -111.2600       9.6        44       178        90
VIS    2025250     91400   16.5700 -111.3100       7.8        63       189       100
VIS    2025250     91400   16.5700 -111.3300       7.7        67       190        99
VIS    2025250     91400   16.5700 -111.3700       6.7        71       188        92
VIS    2025250     91400   16.5700 -111.3900       6.5        69       182        93
VIS    2025250     91400   16.5600 -111.4300       8.0        55       182        99
VIS    2025250     91400   16.5600 -111.4500       8.9        53       184        99
VIS    2025250     91400   16.5600 -111.4600       8.9        54       185        99
VIS    2025250     91400   16.5700 -111.4900       9.1        53       185        98
VIS    2025250     91400   16.5600 -111.5300       9.2        45       183        96
VIS    2025250     91400   16.5500 -111.5700       9.0        49       183        98
VIS    2025250     91400   16.5600 -111.5800       8.8        56       183        94
VIS    2025250     91400   16.5500 -111.6400      10.1        41       181        93
VIS    2025250     91400   16.5500 -111.7500       9.4        54       178        99
VIS    2025250     91400   16.5600 -111.7500       9.6        52       179       100
VIS    2025250     91400   16.5500 -111.8100       8.9        46       178        92
VIS    2025250     91400   16.5600 -111.8800      11.4        39       174        94
VIS    2025250     91400   16.5700 -111.9100      10.4        37       176        97
VIS    2025250     91400   16.5600 -111.9700      10.2        50       173        98
VIS    2025250     91400   16.5600 -111.9900      10.1        47       173       100
VIS    2025250     91400   16.5600 -112.0200       9.8        48       172       100
VIS    2025250     91400   16.5600 -112.0500       9.1        45       174        91
VIS    2025250     91400   16.5400 -112.1000      11.8        51       170        96
VIS    2025250     91400   16.5400 -112.1800      10.0        46       166        98
VIS    2025250     91400   16.5500 -112.1900      10.9        51       166        94
VIS    2025250     91400   16.5500 -112.3400      11.5        12       155        96
VIS    2025250     91400   16.5500 -112.3800      12.6        32       156       100
VIS    2025250     91400   16.5300 -112.4100      14.1        36       161        99
VIS    2025250     91400   16.5300 -112.4400      14.9        34       161        99
VIS    2025250     91400   16.5500 -112.4500      15.2        30       158        99
VIS    2025250     91400   16.5300 -112.5000      14.4        35       158        99
VIS    2025250     91400   16.5300 -112.5100      13.3        35       155        97
VIS    2025250     91400   16.5300 -112.5600      12.8        34       148       100
VIS    2025250     91400   16.5400 -112.5800      13.9        34       144        97
VIS    2025250     91400   16.5300 -112.6000      16.5        35       153        98
VIS    2025250     91400   16.5500 -112.6200      17.4        35       153       100
VIS    2025250     91400   16.5400 -112.6600      12.8        38       159        96
VIS    2025250     91400   16.5400 -112.7000      13.1        41       161       100
VIS    2025250     91400   16.5300 -112.7200      15.4        40       161        99
VIS    2025250     91400   16.5200 -112.7400      15.8        39       161        98
VIS    2025250     91400   16.5400 -112.7800      15.5        35       158       100
VIS    2025250     91400   16.5400 -112.7900      15.2        35       158       100
VIS    2025250     91400   16.5200 -112.9000      17.8        50       161        91
VIS    2025250     91400   16.5300 -112.9200      15.4        48       162        92
VIS    2025250     91400   16.5300 -112.9400      15.1        47       162        96
VIS    2025250     91400   16.5300 -112.9800      16.0        39       165        91
VIS    2025250     91400   16.5200 -113.0900      12.9         9       168        94
VIS    2025250     91400   16.5300 -113.1100      13.2        11       166        96
VIS    2025250     91400   16.5000 -113.4600      16.7        18       159        99
VIS    2025250     91400   16.5000 -113.6200      11.3        30       170        97
VIS    2025250     91400   16.5200 -113.6400      11.6        27       171        96
VIS    2025250     91400   16.5000 -113.7800      17.2        26       171       100
VIS    2025250     91400   16.5000 -113.7900      17.0        27       172       100
VIS    2025250     91400   16.5100 -113.8200      16.3        31       172        99
VIS    2025250     91400   16.5100 -113.8700      10.1        29       176       100
VIS    2025250     91400   16.5000 -113.8700      10.0        31       175       100
VIS    2025250     91400   16.5100 -113.9100      10.7        25       171        99
VIS    2025250     91400   16.5100 -113.9400      10.4        25       169        99
VIS    2025250     91400   16.5100 -113.9900      13.1        31       170        96
VIS    2025250     91400   16.4900 -114.0200      13.8        27       171        99
VIS    2025250     91400   16.5100 -114.0400      14.1        30       173        96
VIS    2025250     91400   16.5000 -114.2100       7.6        12       181        92
VIS    2025250     91400   16.5000 -114.2200       7.4        16       178        93
VIS    2025250     91400   16.4700 -114.9900      16.0        18       170        95
VIS    2025250     91400   16.4800 -115.0000      16.3        17       170        96
VIS    2025250     91400   16.4700 -115.7900      10.4        51       168        91
VIS    2025250     91400   16.4600 -115.8100      11.2        49       170        97
VIS    2025250     91400   16.4600 -115.8300      11.8        49       170       100
VIS    2025250     91400   16.4600 -115.8600      11.3        45       173        99
VIS    2025250     91400   16.4600 -115.9500      12.3        48       172        96
VIS    2025250     91400   16.4500 -115.9600      12.7        48       172        99
VIS    2025250     91400   16.4400 -116.0400       8.9        35       171        96
VIS    2025250     91400   16.4400 -116.0500       9.3        36       169        97
VIS    2025250     91400   16.4400 -116.0900      11.5        45       169       100
VIS    2025250     91400   16.4500 -116.1100      11.9        49       172       100
VIS    2025250     91400   16.4400 -116.1500      11.7        52       179        90
VIS    2025250     91400   16.4500 -116.2600      10.2        48       180        94
VIS    2025250     91400   16.4200 -117.3200       6.9       188       186       100
VIS    2025250     91400   16.4100 -117.5500       7.7        83       189        99
VIS    2025250     91400   16.4100 -117.6500       8.0       355       188        98
VIS    2025250     91400   16.4100 -117.7300      11.5       132       190        93
VIS    2025250     91400   16.4100 -117.8900       5.8       353       183        92
VIS    2025250     91400   16.3900 -118.3300      26.5        96       178        97
VIS    2025250     91400   16.3600 -119.3700      18.7        34       169       100
VIS    2025250     91400   16.5800 -110.0400      11.2        63       189        95
VIS    2025250     91400   16.5800 -110.0500      11.0        63       191        99
VIS    2025250     91400   16.5700 -110.8100       8.2        42       180        92
VIS    2025250     91400   16.5700 -110.8200       8.3        41       181        94
VIS    2025250     91400   16.5700 -110.8400       9.0        43       181        93
VIS    2025250     91400   16.5500 -110.8800       6.1        49       185        99
VIS    2025250     91400   16.5600 -110.9300       9.8        59       186        95
VIS    2025250     91400   16.5600 -110.9500      10.1        60       186        97
VIS    2025250     91400   16.5600 -110.9600       9.9        58       184        97
VIS    2025250     91400   16.5500 -111.0100       6.7        54       178        94
VIS    2025250     91400   16.5600 -111.0700       6.9        53       178        99
VIS    2025250     91400   16.5500 -111.1100       8.3        65       179        98
VIS    2025250     91400   16.5600 -111.1100       8.2        66       180       100
VIS    2025250     91400   16.5400 -111.2000       9.4        54       180        98
VIS    2025250     91400   16.5600 -111.3400       7.5        71       189        99
VIS    2025250     91400   16.5400 -111.3700       6.2        63       188        96
VIS    2025250     91400   16.5500 -111.3800       6.2        71       188        92
VIS    2025250     91400   16.5400 -111.4300       7.7        56       182        98
VIS    2025250     91400   16.5500 -111.4400       8.4        54       184        99
VIS    2025250     91400   16.5500 -111.4700       8.8        55       185        99
VIS    2025250     91400   16.5400 -111.5200       8.7        40       182        90
VIS    2025250     91400   16.5500 -111.5300       9.0        43       182        95
VIS    2025250     91400   16.5400 -111.5700       8.9        45       182        98
VIS    2025250     91400   16.5300 -111.5800       8.6        43       182        99
VIS    2025250     91400   16.5400 -111.6500      10.0        41       181        94
VIS    2025250     91400   16.5400 -111.7100       8.2        56       182        99
VIS    2025250     91400   16.5300 -111.7300       8.6        58       180        93
VIS    2025250     91400   16.5400 -111.7500       9.3        56       180        98
VIS    2025250     91400   16.5400 -111.8000       9.2        44       178        98
VIS    2025250     91400   16.5300 -112.0900      13.4        50       169        98
VIS    2025250     91400   16.5200 -112.1100      13.6        51       167        99
VIS    2025250     91400   16.5300 -112.1800      10.0        46       166        99
VIS    2025250     91400   16.5300 -112.1900      10.2        47       166        98
VIS    2025250     91400   16.5300 -112.3700      12.7        37       161        98
VIS    2025250     91400   16.5300 -112.4100      14.1        37       161        98
VIS    2025250     91400   16.5100 -112.4300      14.6        36       161        99
VIS    2025250     91400   16.5200 -112.4700      15.5        36       159       100
VIS    2025250     91400   16.5200 -112.5000      14.8        36       158        99
VIS    2025250     91400   16.5100 -112.5300      13.9        37       152       100
VIS    2025250     91400   16.5200 -112.5400      13.5        36       151       100
VIS    2025250     91400   16.5200 -112.5900      16.4        35       153        97
VIS    2025250     91400   16.5000 -112.6800      13.5        36       162       100
VIS    2025250     91400   16.5100 -112.6800      13.3        36       162       100
VIS    2025250     91400   16.5100 -112.7200      14.2        41       161        99
VIS    2025250     91400   16.5200 -112.7400      15.7        40       161        98
VIS    2025250     91400   16.5100 -112.8000      15.4        40       159        99
VIS    2025250     91400   16.5100 -112.8400      14.4        38       162        98
VIS    2025250     91400   16.5100 -112.8600      15.1        39       161       100
VIS    2025250     91400   16.5100 -112.9300      15.0        46       162        90
VIS    2025250     91400   16.5000 -113.4500      16.0        19       165        99
VIS    2025250     91400   16.4800 -113.4800      13.7        19       165       100
VIS    2025250     91400   16.4800 -113.5100       8.0        18       168        97
VIS    2025250     91400   16.4800 -113.5100       8.0        18       170        97
VIS    2025250     91400   16.5000 -113.6100      11.3        31       170        97
VIS    2025250     91400   16.4800 -113.6300       8.5        24       171        97
VIS    2025250     91400   16.4900 -113.7700      17.3        25       169       100
VIS    2025250     91400   16.4800 -113.8000      17.4        28       169       100
VIS    2025250     91400   16.4700 -113.8400      11.7        39       174       100
VIS    2025250     91400   16.4800 -113.8700      10.7        33       176        99
VIS    2025250     91400   16.4800 -113.9000      10.9        28       174       100
VIS    2025250     91400   16.4700 -113.9100      11.6        25       174       100
VIS    2025250     91400   16.4900 -113.9400      11.8        24       171       100
VIS    2025250     91400   16.4800 -114.0100      14.0        26       171       100
VIS    2025250     91400   16.4800 -114.0200      13.4        28       171        96
VIS    2025250     91400   16.4600 -114.0600      12.5        31       173       100
VIS    2025250     91400   16.4600 -114.1500      10.0        39       178        95
VIS    2025250     91400   16.4700 -114.1700       9.6        36       179        92
VIS    2025250     91400   16.4700 -114.3500      14.1         3       185        99
VIS    2025250     91400   16.4800 -114.3700      15.3         9       185        93
VIS    2025250     91400   16.4400 -114.8200      12.4        20       178        93
VIS    2025250     91400   16.4400 -114.9100      13.3        27       171        97
VIS    2025250     91400   16.4400 -115.8100      11.8        51       169       100
VIS    2025250     91400   16.4300 -115.8400      11.8        49       170        99
VIS    2025250     91400   16.4200 -116.0500       7.8        44       172        91
VIS    2025250     91400   16.4300 -116.0700      10.1        44       169       100
VIS    2025250     91400   16.4200 -116.1000      11.3        47       171        97
VIS    2025250     91400   16.4300 -116.1100      11.7        49       172       100
VIS    2025250     91400   16.4300 -116.1500      11.5        51       177        93
VIS    2025250     91400   16.4100 -116.2700      10.4        48       181        99
VIS    2025250     91400   16.3800 -117.8600       6.8       350       190        95
VIS    2025250     91400   16.3900 -117.8900       6.3       351       183        94
VIS    2025250     91400   16.3600 -119.3500      18.5        33       170       100
VIS    2025250     91400   16.3600 -119.3600      18.5        33       170       100
VIS    2025250     91400   16.5500 -110.0500      10.9        64       191        96
VIS    2025250     91400   16.5500 -110.8400       7.3        34       183        96
VIS    2025250     91400   16.5400 -110.8800       6.0        41       182        95
VIS    2025250     91400   16.5300 -110.9100       8.2        51       181        94
VIS    2025250     91400   16.5400 -110.9500      10.5        58       183        93
VIS    2025250     91400   16.5400 -111.0100       9.0        48       180        96
VIS    2025250     91400   16.5200 -111.0700      10.0        66       179        90
VIS    2025250     91400   16.5300 -111.0900       9.3        67       179        98
VIS    2025250     91400   16.5400 -111.1100       8.4        66       179        98
VIS    2025250     91400   16.5300 -111.1700       9.0        56       180        99
VIS    2025250     91400   16.5200 -111.1900       9.1        56       180        98
VIS    2025250     91400   16.5400 -111.2100       9.3        55       180        98
VIS    2025250     91400   16.5300 -111.3400       7.1        59       189        99
VIS    2025250     91400   16.5300 -111.3600       6.5        60       188        98
VIS    2025250     91400   16.5100 -111.3900       6.8        47       187        92
VIS    2025250     91400   16.5100 -111.4300       7.0        45       182        90
VIS    2025250     91400   16.5200 -111.4500       7.8        54       182        96
VIS    2025250     91400   16.5300 -111.4800       8.5        59       188       100
VIS    2025250     91400   16.5300 -111.5200       6.9        43       181        98
VIS    2025250     91400   16.5100 -111.5400       6.3        47       179        97
VIS    2025250     91400   16.5100 -111.5700       8.6        40       182        96
VIS    2025250     91400   16.5100 -111.7100       8.8        61       178        93
VIS    2025250     91400   16.5200 -111.7300       8.9        57       180        95
VIS    2025250     91400   16.5000 -111.7800      10.3        50       180        95
VIS    2025250     91400   16.5200 -111.8100      10.1        44       176        98
VIS    2025250     91400   16.5000 -111.8300      10.0        43       174        96
VIS    2025250     91400   16.5000 -112.1000      14.4        52       167        94
VIS    2025250     91400   16.5100 -112.1100      13.6        52       167        99
VIS    2025250     91400   16.5000 -112.3200      10.1        35       162        91
VIS    2025250     91400   16.5000 -112.3500      10.6        35       162        91
VIS    2025250     91400   16.5000 -112.4500      14.9        40       163       100
VIS    2025250     91400   16.5000 -112.4600      15.3        41       161       100
VIS    2025250     91400   16.4800 -112.5000      16.5        40       157        99
VIS    2025250     91400   16.4800 -112.5400      16.1        37       157        93
VIS    2025250     91400   16.5000 -112.5700      12.7        33       157       100
VIS    2025250     91400   16.4900 -112.6800      13.7        36       162       100
VIS    2025250     91400   16.4900 -112.7000      13.9        38       162       100
VIS    2025250     91400   16.4900 -112.7200      14.0        40       161        99
VIS    2025250     91400   16.4800 -112.8500      15.0        40       164        99
VIS    2025250     91400   16.4800 -112.8700      14.9        40       165        98
VIS    2025250     91400   16.4800 -112.9700      17.5        37       167        99
VIS    2025250     91400   16.4900 -112.9800      17.6        37       167       100
VIS    2025250     91400   16.4800 -113.1100       9.5        17       171        93
VIS    2025250     91400   16.4800 -113.1100       9.5        17       171        93
VIS    2025250     91400   16.4700 -113.2800      12.0        14       166        96
VIS    2025250     91400   16.4700 -113.2900      12.2        16       166        92
VIS    2025250     91400   16.4600 -113.3300      14.2        23       163       100
VIS    2025250     91400   16.4600 -113.3500      13.9        24       163       100
VIS    2025250     91400   16.4700 -113.4500      13.0        18       165        93
VIS    2025250     91400   16.4500 -113.4800       9.8        20       168       100
VIS    2025250     91400   16.4600 -113.4900       9.9        22       167        99
VIS    2025250     91400   16.4500 -113.5200       8.3        19       168        99
VIS    2025250     91400   16.4500 -113.5500      13.0        23       169        98
VIS    2025250     91400   16.4500 -113.6000      13.2        23       171       100
VIS    2025250     91400   16.4500 -113.6300       7.6        25       170        95
VIS    2025250     91400   16.4500 -113.6800      11.9        37       171        93
VIS    2025250     91400   16.4500 -113.8000      12.4        34       173        99
VIS    2025250     91400   16.4600 -113.8400      11.8        37       174       100
VIS    2025250     91400   16.4600 -113.8800      12.5        28       176       100
VIS    2025250     91400   16.4500 -113.9100      14.3        22       174        96
VIS    2025250     91400   16.4600 -113.9100      12.6        24       175        99
VIS    2025250     91400   16.4500 -113.9600      12.3        32       173       100
VIS    2025250     91400   16.4500 -113.9700      12.2        32       173        99
VIS    2025250     91400   16.4500 -114.0400      12.5        31       173       100
VIS    2025250     91400   16.4500 -114.0500      12.6        31       173       100
VIS    2025250     91400   16.4500 -114.1200      10.7        40       180        99
VIS    2025250     91400   16.4500 -114.1600      10.0        38       179        93
VIS    2025250     91400   16.4600 -114.1600       9.8        37       179        92
VIS    2025250     91400   16.4500 -114.3400      13.8       359       186        99
VIS    2025250     91400   16.4300 -114.8300      12.6        21       178        92
VIS    2025250     91400   16.4200 -114.8400      12.8        34       179        92
VIS    2025250     91400   16.4200 -114.8900      14.3        25       174        99
VIS    2025250     91400   16.4300 -114.9000      13.6        26       173       100
VIS    2025250     91400   16.4200 -114.9500      10.3        14       171        96
VIS    2025250     91400   16.3900 -116.0700      10.1        48       173        96
VIS    2025250     91400   16.4100 -116.1000      11.3        48       172        97
VIS    2025250     91400   16.3900 -116.1300      11.4        47       174        92
VIS    2025250     91400   16.4100 -116.1600      11.6        44       179        97
VIS    2025250     91400   16.4000 -116.1800      12.2        39       184        96
VIS    2025250     91400   16.4000 -116.2200      12.1        55       185        91
VIS    2025250     91400   16.3400 -118.0200      12.2        27       188        99
VIS    2025250     91400   16.5100 -110.9300       9.2        50       181        92
VIS    2025250     91400   16.5000 -111.1800       8.6        58       180        98
VIS    2025250     91400   16.5100 -111.3800       7.0        46       188        94
VIS    2025250     91400   16.4900 -111.4400       7.3        38       183        93
VIS    2025250     91400   16.4900 -111.4400       7.4        39       183        93
VIS    2025250     91400   16.4800 -111.4900       7.1        33       184        91
VIS    2025250     91400   16.5000 -111.5000       5.3        49       181        95
VIS    2025250     91400   16.4800 -111.5600       6.4        56       181        99
VIS    2025250     91400   16.5000 -111.5700       8.0        45       182       100
VIS    2025250     91400   16.5000 -111.5900       9.4        41       182        95
VIS    2025250     91400   16.5000 -111.6500       6.1        49       182        99
VIS    2025250     91400   16.4900 -111.7800      10.1        51       180        95
VIS    2025250     91400   16.4900 -111.8200       9.7        44       174        96
VIS    2025250     91400   16.4900 -111.8300       9.4        46       174        95
VIS    2025250     91400   16.4900 -112.0100       7.3       360       169        92
VIS    2025250     91400   16.4800 -112.0800      13.0        60       167        97
VIS    2025250     91400   16.4800 -112.0800      13.1        59       167        97
VIS    2025250     91400   16.4700 -112.1200      13.6        59       167        98
VIS    2025250     91400   16.4700 -112.4800      17.7        41       158        98
VIS    2025250     91400   16.4600 -112.5100      18.2        38       160        96
VIS    2025250     91400   16.4700 -112.5400      16.0        36       157        92
VIS    2025250     91400   16.4500 -112.7700      13.4        43       165        96
VIS    2025250     91400   16.4500 -112.7900      13.7        44       166        99
VIS    2025250     91400   16.4500 -112.8400      16.3        45       166        97
VIS    2025250     91400   16.4600 -112.8700      16.0        38       167        99
VIS    2025250     91400   16.4400 -112.9100      15.8        29       164        92
VIS    2025250     91400   16.4600 -113.0300      16.9        37       169        99
VIS    2025250     91400   16.4500 -113.0500      16.6        36       169       100
VIS    2025250     91400   16.4600 -113.0600      16.7        37       167       100
VIS    2025250     91400   16.4500 -113.2900      11.8        16       165        95
VIS    2025250     91400   16.4300 -113.3200      12.3        21       164       100
VIS    2025250     91400   16.4300 -113.3300      12.6        22       162       100
VIS    2025250     91400   16.4400 -113.3700      14.0        27       163        99
VIS    2025250     91400   16.4300 -113.3800      13.6        32       163        98
VIS    2025250     91400   16.4400 -113.4700       9.5        22       169       100
VIS    2025250     91400   16.4500 -113.4900       8.9        20       168        93
VIS    2025250     91400   16.4500 -113.5200       8.4        20       168        99
VIS    2025250     91400   16.4300 -113.5700      12.6        23       171       100
VIS    2025250     91400   16.4300 -113.5900      12.6        22       171       100
VIS    2025250     91400   16.4300 -113.6600       6.4        32       170        90
VIS    2025250     91400   16.4200 -113.8100      13.0        30       174       100
VIS    2025250     91400   16.4200 -113.8300      12.9        31       177       100
VIS    2025250     91400   16.4200 -113.8800      13.5        24       174        99
VIS    2025250     91400   16.4200 -113.8900      13.7        23       174       100
VIS    2025250     91400   16.4300 -113.9200      14.6        22       172        97
VIS    2025250     91400   16.4300 -113.9600      12.2        31       175        97
VIS    2025250     91400   16.4400 -114.0200      13.1        28       173        98
VIS    2025250     91400   16.4200 -114.0500      13.3        27       174        99
VIS    2025250     91400   16.4200 -114.0600      13.3        27       175       100
VIS    2025250     91400   16.4200 -114.1400      10.9        36       180        93
VIS    2025250     91400   16.4100 -114.1500      13.0        26       188        93
VIS    2025250     91400   16.4000 -114.7700      11.2        23       181        97
VIS    2025250     91400   16.4200 -114.7900      11.1        21       181        97
VIS    2025250     91400   16.4000 -114.8200      12.9        32       179        99
VIS    2025250     91400   16.4000 -114.8400      13.0        33       179        97
VIS    2025250     91400   16.4100 -114.8900      14.6        23       174        98
VIS    2025250     91400   16.4100 -114.9000      14.6        23       174        99
VIS    2025250     91400   16.4000 -114.9500      11.1        16       173        97
VIS    2025250     91400   16.4100 -114.9500      11.0        14       172        98
VIS    2025250     91400   16.3700 -116.0300      12.7        36       171        97
VIS    2025250     91400   16.3700 -116.0400      12.8        35       171        95
VIS    2025250     91400   16.3700 -116.0700      11.8        37       171        96
VIS    2025250     91400   16.3600 -116.1000       9.9        40       171        92
VIS    2025250     91400   16.3800 -116.1300      11.4        46       174        94
VIS    2025250     91400   16.3700 -116.1600      11.4        42       176        91
VIS    2025250     91400   16.3800 -116.2100      12.4        53       186        93
VIS    2025250     91400   16.3400 -118.0200      12.2        27       188        99
VIS    2025250     91400   16.3100 -118.4200       8.2        65       186       100
VIS    2025250     91400   16.3200 -118.4400       8.6        67       186        99
VIS    2025250     91400   16.3300 -118.4700       8.8        65       186        98
VIS    2025250     91400   16.5200 -109.8800       4.5        68       188        96
VIS    2025250     91400   16.5000 -109.9900       9.7       120       188        93
VIS    2025250     91400   16.5000 -110.1500      12.7        66       188        95
VIS    2025250     91400   16.5000 -110.2700       6.4        55       190        98
VIS    2025250     91400   16.5000 -110.8100      11.3        10       190        96
VIS    2025250     91400   16.4900 -110.9400       9.9        47       181        96
VIS    2025250     91400   16.4900 -111.0500       8.9        53       186        98
VIS    2025250     91400   16.4700 -111.4300       8.1        35       183       100
VIS    2025250     91400   16.4800 -111.4600       7.6        30       184        96
VIS    2025250     91400   16.4800 -111.5500       6.2        58       184        97
VIS    2025250     91400   16.4700 -111.5600       6.4        57       184       100
VIS    2025250     91400   16.4700 -111.6000       9.5        49       185       100
VIS    2025250     91400   16.4600 -111.6400       9.3        52       184        99
VIS    2025250     91400   16.4500 -111.6700       8.6        53       184       100
VIS    2025250     91400   16.4500 -111.9100      16.6        50       179        96
VIS    2025250     91400   16.4600 -112.0600      18.0        56       168       100
VIS    2025250     91400   16.4400 -112.4000      19.1        37       167        91
VIS    2025250     91400   16.4500 -112.4200      18.6        35       167        91
VIS    2025250     91400   16.4400 -112.4700      18.9        38       165        98
VIS    2025250     91400   16.4500 -112.5100      18.3        38       160        96
VIS    2025250     91400   16.4300 -112.5400      18.6        56       166       100
VIS    2025250     91400   16.4400 -112.7100      14.8        40       164       100
VIS    2025250     91400   16.4400 -112.7400      15.0        42       165        97
VIS    2025250     91400   16.4400 -112.7600      13.6        44       165        93
VIS    2025250     91400   16.4200 -112.8100      13.9        41       170       100
VIS    2025250     91400   16.4200 -112.8200      13.9        40       170       100
VIS    2025250     91400   16.4200 -112.8600      17.6        35       165        99
VIS    2025250     91400   16.4300 -112.8900      17.2        34       165       100
VIS    2025250     91400   16.4400 -112.9100      16.3        31       165        98
VIS    2025250     91400   16.4300 -112.9300      15.8        32       164        98
VIS    2025250     91400   16.4300 -113.0200      15.9        36       169       100
VIS    2025250     91400   16.4200 -113.0600      16.3        36       169       100
VIS    2025250     91400   16.4400 -113.0800      16.1        36       167        96
VIS    2025250     91400   16.4100 -113.1900      15.4        25       164       100
VIS    2025250     91400   16.4100 -113.2100      15.5        25       165       100
VIS    2025250     91400   16.4200 -113.2600      15.1        24       165        96
VIS    2025250     91400   16.4100 -113.2900      10.8        20       162        94
VIS    2025250     91400   16.4100 -113.3000      10.7        20       162        95
VIS    2025250     91400   16.4300 -113.3300      12.4        22       162       100
VIS    2025250     91400   16.4100 -113.3700      12.8        30       164        99
VIS    2025250     91400   16.4100 -113.4000      13.6        36       165        97
VIS    2025250     91400   16.4100 -113.4300      14.0        33       170       100
VIS    2025250     91400   16.4300 -113.4700       8.1        20       171       100
VIS    2025250     91400   16.4200 -113.5100       9.9        19       171        99
VIS    2025250     91400   16.4000 -113.5300      11.7        22       171        98
VIS    2025250     91400   16.4100 -113.5800      12.2        23       170       100
VIS    2025250     91400   16.4200 -113.5800      12.6        22       171       100
VIS    2025250     91400   16.4100 -113.6100      12.5        21       173       100
VIS    2025250     91400   16.4100 -113.7700      13.1        29       173        98
VIS    2025250     91400   16.4200 -113.7800      13.2        29       173        97
VIS    2025250     91400   16.4000 -113.8100      13.7        31       173        99
VIS    2025250     91400   16.4000 -113.8600      14.1        28       174        99
VIS    2025250     91400   16.4000 -113.8600      14.0        27       174       100
VIS    2025250     91400   16.3900 -113.9200      10.8        24       172        95
VIS    2025250     91400   16.3900 -113.9300      10.5        27       172        90
VIS    2025250     91400   16.3900 -113.9700      14.5        22       174       100
VIS    2025250     91400   16.4000 -113.9800      14.8        23       174       100
VIS    2025250     91400   16.3900 -114.0300      14.1        24       173        99
VIS    2025250     91400   16.3900 -114.0400      14.0        23       173       100
VIS    2025250     91400   16.3900 -114.0800      13.5        25       179       100
VIS    2025250     91400   16.3900 -114.1000      12.8        26       181        99
VIS    2025250     91400   16.4000 -114.1200      12.7        29       182        98
VIS    2025250     91400   16.3900 -114.7300      13.0        13       183        90
VIS    2025250     91400   16.3800 -114.7700      11.4        29       179        98
VIS    2025250     91400   16.3800 -114.8100      11.7        30       179        97
VIS    2025250     91400   16.3800 -114.8200      12.8        30       179       100
VIS    2025250     91400   16.3500 -115.9800      12.3        46       178        98
VIS    2025250     91400   16.3500 -116.0300      11.8        39       170       100
VIS    2025250     91400   16.3600 -116.0300      12.4        37       171        98
VIS    2025250     91400   16.3500 -116.1700      10.7        43       170       100
VIS    2025250     91400   16.3400 -116.1700      10.5        44       169        99
VIS    2025250     91400   16.3400 -116.2200       9.7        45       175        98
VIS    2025250     91400   16.3100 -118.4200       8.2        64       183       100
VIS    2025250     91400   16.2900 -118.4500      10.0        59       182        93
VIS    2025250     91400   16.3000 -118.4700       9.2        68       185        97
VIS    2025250     91400   16.4900 -110.1300      13.2        61       186        98
VIS    2025250     91400   16.4700 -110.2100       6.0        58       190        98
VIS    2025250     91400   16.4700 -111.0500      10.0        49       186        98
VIS    2025250     91400   16.4400 -111.5700       6.4        63       182        91
VIS    2025250     91400   16.4300 -111.6200       8.7        57       185        99
VIS    2025250     91400   16.4400 -111.6500       9.1        56       185        96
VIS    2025250     91400   16.4300 -111.6800       9.1        53       184        96
VIS    2025250     91400   16.4300 -111.7600       9.5        46       178        96
VIS    2025250     91400   16.4200 -111.8200      12.3        31       172       100
VIS    2025250     91400   16.4300 -111.8300      12.4        30       172       100
VIS    2025250     91400   16.4400 -111.9000      14.8        45       176        95
VIS    2025250     91400   16.4200 -112.1400      13.5        60       172       100
VIS    2025250     91400   16.4100 -112.2900      18.7        55       169        90
VIS    2025250     91400   16.4100 -112.4100      18.9        39       167       100
VIS    2025250     91400   16.4100 -112.4100      18.9        39       167       100
VIS    2025250     91400   16.4100 -112.5000      19.2        46       171        97
VIS    2025250     91400   16.4100 -112.5500      18.5        55       166        99
VIS    2025250     91400   16.4200 -112.5600      18.5        55       166       100
VIS    2025250     91400   16.4100 -112.7400      14.8        42       168        99
VIS    2025250     91400   16.4200 -112.8100      14.3        41       170        99
VIS    2025250     91400   16.4000 -112.8300      16.6        36       163        94
VIS    2025250     91400   16.4000 -112.8600      17.0        35       163        97
VIS    2025250     91400   16.4200 -112.8800      17.5        35       165        99
VIS    2025250     91400   16.4000 -112.9100      16.0        36       166       100
VIS    2025250     91400   16.4000 -112.9500      15.6        37       168        91
VIS    2025250     91400   16.4100 -113.0300      15.9        36       170        98
VIS    2025250     91400   16.4100 -113.0500      16.0        36       169       100
VIS    2025250     91400   16.4100 -113.0800      15.7        36       169        96
VIS    2025250     91400   16.3900 -113.1800      15.6        26       164       100
VIS    2025250     91400   16.4000 -113.1900      15.5        26       164       100
VIS    2025250     91400   16.4000 -113.2200      15.7        25       165       100
VIS    2025250     91400   16.3900 -113.2500      15.6        22       165       100
VIS    2025250     91400   16.3900 -113.2800      11.2        20       162        90
VIS    2025250     91400   16.4000 -113.3000      11.4        21       162       100
VIS    2025250     91400   16.3800 -113.3500      13.0        26       165       100
VIS    2025250     91400   16.4000 -113.3700      12.9        29       165       100
VIS    2025250     91400   16.4000 -113.3800      13.2        32       165        99
VIS    2025250     91400   16.4000 -113.4400      14.0        33       171       100
VIS    2025250     91400   16.4000 -113.4500      14.1        29       172       100
VIS    2025250     91400   16.4000 -113.4700      14.6        26       172       100
VIS    2025250     91400   16.3900 -113.5200      12.6        23       171        94
VIS    2025250     91400   16.4000 -113.5300      11.7        23       171        97
VIS    2025250     91400   16.3800 -113.6500      16.0        39       172        95
VIS    2025250     91400   16.3900 -113.7700      13.0        31       173       100
VIS    2025250     91400   16.3900 -113.7800      13.0        31       173        99
VIS    2025250     91400   16.3800 -113.8100      13.7        31       173        98
VIS    2025250     91400   16.3800 -113.8600      14.1        28       174        99
VIS    2025250     91400   16.3800 -113.8800      12.2        24       174       100
VIS    2025250     91400   16.3700 -113.9500      13.8        23       173       100
VIS    2025250     91400   16.3800 -113.9600      14.2        22       173       100
VIS    2025250     91400   16.3900 -114.0000      14.3        23       173        99
VIS    2025250     91400   16.3800 -114.0300      13.9        24       173       100
VIS    2025250     91400   16.3700 -114.0400      13.7        24       173        99
VIS    2025250     91400   16.3800 -114.0700      14.0        22       176       100
VIS    2025250     91400   16.3700 -114.1100      12.6        24       184        97
VIS    2025250     91400   16.3600 -114.1400      11.7        20       185        98
VIS    2025250     91400   16.3700 -114.1700      11.2        20       184        97
VIS    2025250     91400   16.3700 -114.1800      11.1        21       184        99
VIS    2025250     91400   16.3500 -114.7700      11.3        34       181        90
VIS    2025250     91400   16.3600 -114.8200      12.6        30       179       100
VIS    2025250     91400   16.3300 -115.6600      11.4        16       165        98
VIS    2025250     91400   16.3300 -115.7900       6.4        51       170        98
VIS    2025250     91400   16.3300 -115.9700      11.2        52       177        94
VIS    2025250     91400   16.3400 -116.0000      10.8        46       176        98
VIS    2025250     91400   16.3300 -116.0300      10.7        43       169       100
VIS    2025250     91400   16.3300 -116.0400      11.0        41       169       100
VIS    2025250     91400   16.3300 -116.0800      11.3        40       168        97
VIS    2025250     91400   16.3400 -116.0900      10.4        42       168        98
VIS    2025250     91400   16.3300 -116.1700      10.6        40       167       100
VIS    2025250     91400   16.3300 -116.2200       9.6        44       175        99
VIS    2025250     91400   16.2700 -118.0100       7.0         6       188        99
VIS    2025250     91400   16.2800 -118.0300       7.2        10       188        90
VIS    2025250     91400   16.4300 -111.1900      10.6        54       189       100
VIS    2025250     91400   16.4200 -111.4000       9.2        45       188        90
VIS    2025250     91400   16.4300 -111.4400      10.1        39       181        99
VIS    2025250     91400   16.4200 -111.6200       8.6        58       185        96
VIS    2025250     91400   16.4200 -111.6400       9.0        58       185        93
VIS    2025250     91400   16.4100 -111.6700       8.6        57       184        95
VIS    2025250     91400   16.4100 -111.8200      12.2        31       172       100
VIS    2025250     91400   16.4100 -111.8400      12.4        30       172       100
VIS    2025250     91400   16.4000 -112.2700      18.5        53       169       100
VIS    2025250     91400   16.4100 -112.2800      18.6        55       169        99
VIS    2025250     91400   16.3800 -112.3900       8.3        26       169        95
VIS    2025250     91400   16.4000 -112.4300      19.5        42       166       100
VIS    2025250     91400   16.3800 -112.4700      18.6        46       168        96
VIS    2025250     91400   16.4000 -112.5000      19.2        47       171        97
VIS    2025250     91400   16.4000 -112.5400      18.6        55       166        99
VIS    2025250     91400   16.3800 -112.6100      15.3        39       163       100
VIS    2025250     91400   16.3800 -112.6400      15.9        38       165       100
VIS    2025250     91400   16.3800 -112.6500      16.1        38       166       100
VIS    2025250     91400   16.3900 -112.7000      16.2        38       166       100
VIS    2025250     91400   16.3800 -112.7100      16.4        37       169       100
VIS    2025250     91400   16.3900 -112.7600      13.8        34       168        95
VIS    2025250     91400   16.3700 -112.8000      17.7        36       162       100
VIS    2025250     91400   16.3800 -112.8300      17.8        37       162       100
VIS    2025250     91400   16.3900 -112.8500      16.7        35       163        96
VIS    2025250     91400   16.3800 -112.8900      17.8        37       165       100
VIS    2025250     91400   16.3900 -112.9000      16.3        36       166       100
VIS    2025250     91400   16.3900 -112.9400      15.1        36       168        94
VIS    2025250     91400   16.3600 -113.1500      18.1        31       165        97
VIS    2025250     91400   16.3800 -113.1800      15.5        27       164       100
VIS    2025250     91400   16.3700 -113.2300      16.4        28       165       100
VIS    2025250     91400   16.3800 -113.2700      15.9        20       165       100
VIS    2025250     91400   16.3600 -113.3300      12.7        23       164        99
VIS    2025250     91400   16.3700 -113.3600      12.5        25       166        99
VIS    2025250     91400   16.3700 -113.3600      13.1        25       166       100
VIS    2025250     91400   16.3700 -113.4500      14.1        30       172        91
VIS    2025250     91400   16.3700 -113.4900      15.1        22       172       100
VIS    2025250     91400   16.3700 -113.5000      15.1        22       171       100
VIS    2025250     91400   16.3700 -113.5700      11.9        30       171        98
VIS    2025250     91400   16.3700 -113.6500      16.3        38       172        91
VIS    2025250     91400   16.3500 -113.7600      12.7        30       171       100
VIS    2025250     91400   16.3700 -113.7600      12.7        30       171       100
VIS    2025250     91400   16.3500 -113.8100      13.7        29       175        93
VIS    2025250     91400   16.3600 -113.8400      13.9        28       173       100
VIS    2025250     91400   16.3500 -113.8500      13.9        27       175       100
VIS    2025250     91400   16.3500 -113.8900      12.7        28       175       100
VIS    2025250     91400   16.3600 -113.9500      13.4        24       174        99
VIS    2025250     91400   16.3500 -113.9600      13.1        26       175        95
VIS    2025250     91400   16.3500 -114.0100      12.7        27       173        99
VIS    2025250     91400   16.3600 -114.0300      13.5        24       173       100
VIS    2025250     91400   16.3600 -114.0400      13.6        24       173        99
VIS    2025250     91400   16.3500 -114.0800      13.7        22       178       100
VIS    2025250     91400   16.3400 -114.1200      12.8        23       182       100
VIS    2025250     91400   16.3400 -114.1400      12.0        21       187        98
VIS    2025250     91400   16.3500 -114.1800      11.3        20       189        99
VIS    2025250     91400   16.3600 -114.1800      11.1        20       184        99
VIS    2025250     91400   16.3200 -114.7900      12.5        32       183        92
VIS    2025250     91400   16.3300 -114.8200      12.8        31       179        95
VIS    2025250     91400   16.3000 -115.6100      11.3        18       165        98
VIS    2025250     91400   16.3200 -115.6400      11.5        14       165        99
VIS    2025250     91400   16.3200 -115.6600      11.0        19       165        93
VIS    2025250     91400   16.3000 -115.7100       4.5        48       168        99
VIS    2025250     91400   16.2900 -115.9400      13.1        58       176        94
VIS    2025250     91400   16.3100 -116.0100      10.8        44       175        98
VIS    2025250     91400   16.3100 -116.1300      11.7        53       163        98
VIS    2025250     91400   16.3000 -116.2200       9.4        47       169       100
VIS    2025250     91400   16.2700 -117.9100       4.5        66       190        98
VIS    2025250     91400   16.2700 -118.0100       6.8         4       188        97
VIS    2025250     91400   16.2400 -118.4700       9.1        48       182        94
VIS    2025250     91400   16.2400 -118.4800       8.9        49       182        94
VIS    2025250     91400   16.3800 -111.9800       5.6        35       174       100
VIS    2025250     91400   16.3800 -112.0300      11.5        47       173        91
VIS    2025250     91400   16.3800 -112.2900      18.0        56       169        91
VIS    2025250     91400   16.3600 -112.3900       8.3        26       169        95
VIS    2025250     91400   16.3600 -112.3900       8.3        26       169        95
VIS    2025250     91400   16.3700 -112.4700      18.4        46       168        95
VIS    2025250     91400   16.3700 -112.4800      18.6        45       169        96
VIS    2025250     91400   16.3600 -112.5200      18.9        44       170       100
VIS    2025250     91400   16.3700 -112.5500      18.8        42       164        97
VIS    2025250     91400   16.3700 -112.5700      18.4        41       164        92
VIS    2025250     91400   16.3600 -112.6200      15.4        40       163       100
VIS    2025250     91400   16.3700 -112.6500      16.0        39       165       100
VIS    2025250     91400   16.3600 -112.6600      16.4        39       168       100
VIS    2025250     91400   16.3500 -112.7000      18.0        40       164        99
VIS    2025250     91400   16.3700 -112.7100      16.8        38       169       100
VIS    2025250     91400   16.3500 -112.7600      17.6        38       163        98
VIS    2025250     91400   16.3600 -112.7700      17.3        37       162        98
VIS    2025250     91400   16.3700 -112.7900      16.9        35       161        98
VIS    2025250     91400   16.3500 -112.8400      17.5        35       162       100
VIS    2025250     91400   16.3600 -112.8600      17.6        36       163        99
VIS    2025250     91400   16.3600 -112.8800      17.7        36       167        99
VIS    2025250     91400   16.3600 -112.9700      14.4        18       171        90
VIS    2025250     91400   16.3600 -113.0700      17.5        36       166       100
VIS    2025250     91400   16.3600 -113.1400      18.6        33       165        98
VIS    2025250     91400   16.3500 -113.2500      16.0        17       164        95
VIS    2025250     91400   16.3400 -113.3300      13.2        24       163        98
VIS    2025250     91400   16.3500 -113.3600      12.8        24       165       100
VIS    2025250     91400   16.3300 -113.3900      13.2        28       167        91
VIS    2025250     91400   16.3400 -113.4200      11.2        35       171        96
VIS    2025250     91400   16.3500 -113.7000      11.3        40       168        93
VIS    2025250     91400   16.3400 -113.7600      12.7        30       171       100
VIS    2025250     91400   16.3400 -113.7600      12.7        30       171       100
VIS    2025250     91400   16.3400 -113.8100      13.6        30       175        92
VIS    2025250     91400   16.3200 -113.8300      14.1        28       175        99
VIS    2025250     91400   16.3400 -113.8700      13.6        28       175       100
VIS    2025250     91400   16.3300 -113.8800      13.4        28       175       100
VIS    2025250     91400   16.3200 -113.9100      13.1        27       179       100
VIS    2025250     91400   16.3200 -113.9600      13.3        26       178        99
VIS    2025250     91400   16.3300 -113.9600      13.3        26       177        99
VIS    2025250     91400   16.3200 -114.0000      13.2        27       178        99
VIS    2025250     91400   16.3200 -114.0200      12.4        27       178        95
VIS    2025250     91400   16.3400 -114.0700      14.0        22       178       100
VIS    2025250     91400   16.3200 -114.0800      13.9        23       182       100
VIS    2025250     91400   16.3300 -114.1100      13.2        23       182       100
VIS    2025250     91400   16.3100 -114.6900       9.6        15       181        99
VIS    2025250     91400   16.3000 -114.8200      13.5        27       180        99
VIS    2025250     91400   16.3000 -114.8500      14.1        24       177       100
VIS    2025250     91400   16.3000 -114.8700      15.2        21       175        96
VIS    2025250     91400   16.2900 -115.5900       8.4        15       166        94
VIS    2025250     91400   16.2900 -115.6300       7.4       353       163       100
VIS    2025250     91400   16.2700 -116.0900      14.3        43       168       100
VIS    2025250     91400   16.2700 -116.1000      14.3        43       168       100
VIS    2025250     91400   16.2800 -116.1500      12.7        50       164        99
VIS    2025250     91400   16.2800 -116.1800      11.5        41       165        95
VIS    2025250     91400   16.2700 -116.1800      12.0        40       167        96
VIS    2025250     91400   16.2400 -117.8700       4.3        70       189        98
VIS    2025250     91400   16.2400 -117.9000       4.5        74       189        94
VIS    2025250     91400   16.2400 -117.9200       4.4        74       190        96
VIS    2025250     91400   16.2200 -118.3700       9.0        49       185        99
VIS    2025250     91400   16.4100 -110.1000      12.6        80       191        97
VIS    2025250     91400   16.3800 -110.9700       8.6        35       190        98
VIS    2025250     91400   16.3600 -111.3500       8.3        52       187        99
VIS    2025250     91400   16.3600 -111.9600       9.8        47       174        99
VIS    2025250     91400   16.3600 -112.0500      10.2        45       172       100
VIS    2025250     91400   16.3400 -112.1900      12.8        57       171        99
VIS    2025250     91400   16.3600 -112.2300      13.3        59       172       100
VIS    2025250     91400   16.3400 -112.3900      21.2        54       173        90
VIS    2025250     91400   16.3400 -112.4000      21.3        61       173        98
VIS    2025250     91400   16.3500 -112.4800      19.1        45       168       100
VIS    2025250     91400   16.3500 -112.4800      18.5        45       168        97
VIS    2025250     91400   16.3300 -112.5300      12.2        26       165       100
VIS    2025250     91400   16.3500 -112.5700      19.1        42       164        98
VIS    2025250     91400   16.3400 -112.6300      16.1        41       166        99
VIS    2025250     91400   16.3400 -112.6600      17.3        41       168       100
VIS    2025250     91400   16.3300 -112.7100      19.1        42       162        98
VIS    2025250     91400   16.3300 -112.7200      19.0        42       162        99
VIS    2025250     91400   16.3300 -112.7600      18.7        40       161        99
VIS    2025250     91400   16.3300 -112.7800      18.0        37       160        99
VIS    2025250     91400   16.3300 -112.8200      17.6        34       162       100
VIS    2025250     91400   16.3400 -112.8300      17.6        34       162       100
VIS    2025250     91400   16.3400 -112.8600      17.5        35       167        99
VIS    2025250     91400   16.3200 -113.0500      16.7        31       166        90
VIS    2025250     91400   16.3300 -113.1000      17.7        34       165        99
VIS    2025250     91400   16.3300 -113.1300      18.4        33       165        97
VIS    2025250     91400   16.3400 -113.1400      18.8        34       165        95
VIS    2025250     91400   16.3100 -113.3000      13.2        27       162        99
VIS    2025250     91400   16.3100 -113.3400      13.8        25       162       100
VIS    2025250     91400   16.3200 -113.3400      13.8        25       162       100
VIS    2025250     91400   16.3200 -113.3800      14.4        23       165       100
VIS    2025250     91400   16.3100 -113.4100      11.3        38       171        97
VIS    2025250     91400   16.3200 -113.4300      11.5        37       171        96
VIS    2025250     91400   16.3100 -113.7000      15.6        24       164       100
VIS    2025250     91400   16.3000 -113.7300      16.0        26       169       100
VIS    2025250     91400   16.3000 -113.7400      16.0        27       169       100
VIS    2025250     91400   16.3100 -113.7800      14.3        26       171        99
VIS    2025250     91400   16.3100 -113.8000      14.7        26       171       100
VIS    2025250     91400   16.3100 -113.8400      13.6        29       175        98
VIS    2025250     91400   16.3000 -113.8800      13.5        25       178        99
VIS    2025250     91400   16.3000 -113.8800      13.2        25       178        98
VIS    2025250     91400   16.3200 -113.9100      13.4        26       179        99
VIS    2025250     91400   16.2900 -113.9500      13.2        24       177       100
VIS    2025250     91400   16.2900 -113.9700      12.8        24       177       100
VIS    2025250     91400   16.2900 -114.0100      13.3        26       177        99
VIS    2025250     91400   16.2900 -114.0400      14.0        27       176        94
VIS    2025250     91400   16.2900 -114.0700      14.5        25       177       100
VIS    2025250     91400   16.3100 -114.1000      13.8        24       182       100
VIS    2025250     91400   16.2900 -114.1300      13.3        23       183        97
VIS    2025250     91400   16.3000 -114.1900      11.4        24       188        91
VIS    2025250     91400   16.2800 -114.7100       9.3        41       179        90
VIS    2025250     91400   16.3000 -114.7200      10.1        39       179        98
VIS    2025250     91400   16.2700 -114.8300      14.4        23       177       100
VIS    2025250     91400   16.2700 -114.8400      14.5        22       177       100
VIS    2025250     91400   16.2400 -116.0900      14.3        42       171       100
VIS    2025250     91400   16.2500 -116.1100      14.3        42       170       100
VIS    2025250     91400   16.2500 -116.1500      14.1        45       166       100
VIS    2025250     91400   16.2500 -116.1800      13.0        42       167       100
VIS    2025250     91400   16.2400 -116.3800       9.0        44       164        95
VIS    2025250     91400   16.2400 -116.3900       9.0        43       165        97
VIS    2025250     91400   16.2000 -118.3700       9.2        50       186        98
VIS    2025250     91400   16.3800 -110.1100       6.4        57       191        90
VIS    2025250     91400   16.3700 -110.9500       8.1        30       190        90
VIS    2025250     91400   16.3600 -110.9800       8.8        37       190        96
VIS    2025250     91400   16.3500 -111.3600       7.4        54       187        96
VIS    2025250     91400   16.3400 -111.4200       7.8        46       182        94
VIS    2025250     91400   16.3500 -111.4900       9.7        54       180        97
VIS    2025250     91400   16.3400 -111.5300       8.6        55       181       100
VIS    2025250     91400   16.3400 -111.5400       8.9        54       181        99
VIS    2025250     91400   16.3400 -111.5700       9.5        54       182        96
VIS    2025250     91400   16.3400 -111.8300      13.1        33       177        93
VIS    2025250     91400   16.3300 -111.9600       9.5        45       174       100
VIS    2025250     91400   16.3300 -111.9700       9.5        46       174        99
VIS    2025250     91400   16.3100 -112.2900      21.0        41       176        90
VIS    2025250     91400   16.3300 -112.3600      22.4        51       169        95
VIS    2025250     91400   16.3200 -112.4000      22.6        53       173        96
VIS    2025250     91400   16.3100 -112.4000      22.6        53       173        96
VIS    2025250     91400   16.3200 -112.5500      12.0        23       164        99
VIS    2025250     91400   16.3100 -112.6300      18.5        44       168        95
VIS    2025250     91400   16.3100 -112.6300      18.6        44       168        95
VIS    2025250     91400   16.3100 -112.6700      19.5        44       164        99
VIS    2025250     91400   16.3200 -112.7000      19.2        42       164        98
VIS    2025250     91400   16.3200 -112.7200      19.1        42       162        99
VIS    2025250     91400   16.3200 -112.7700      18.5        38       160       100
VIS    2025250     91400   16.3100 -112.8000      17.9        36       164        99
VIS    2025250     91400   16.3200 -112.8000      17.8        35       164        99
VIS    2025250     91400   16.3100 -112.8500      17.8        34       166       100
VIS    2025250     91400   16.3100 -112.8800      18.6        37       166       100
VIS    2025250     91400   16.2900 -113.0000      15.3        27       168       100
VIS    2025250     91400   16.3000 -113.0100      15.4        27       166        99
VIS    2025250     91400   16.2900 -113.0800      17.8        37       166        99
VIS    2025250     91400   16.2900 -113.0900      17.9        37       166        99
VIS    2025250     91400   16.3100 -113.1300      18.0        34       165       100
VIS    2025250     91400   16.3000 -113.2300      16.4        29       167        91
VIS    2025250     91400   16.3000 -113.3000      13.4        27       162        96
VIS    2025250     91400   16.3100 -113.3400      13.8        26       162       100
VIS    2025250     91400   16.2900 -113.3700      12.7        30       165       100
VIS    2025250     91400   16.2900 -113.4000      11.0        38       170        97
VIS    2025250     91400   16.2900 -113.4400      11.4        37       171        91
VIS    2025250     91400   16.2800 -113.6700      14.4        27       167        99
VIS    2025250     91400   16.2900 -113.7000      14.8        25       167        97
VIS    2025250     91400   16.2800 -113.7400      15.4        25       169        99
VIS    2025250     91400   16.2900 -113.7400      15.5        26       169       100
VIS    2025250     91400   16.2900 -113.7700      15.6        27       170       100
VIS    2025250     91400   16.2800 -113.8100      15.2        22       173       100
VIS    2025250     91400   16.2700 -113.8500      14.9        21       177       100
VIS    2025250     91400   16.2800 -113.8700      13.9        25       178       100
VIS    2025250     91400   16.2900 -113.9000      13.2        24       179        99
VIS    2025250     91400   16.2900 -113.9400      12.7        23       177        99
VIS    2025250     91400   16.2900 -113.9500      12.5        24       177        99
VIS    2025250     91400   16.2800 -113.9800      12.5        26       177       100
VIS    2025250     91400   16.2900 -114.0000      13.1        27       177        98
VIS    2025250     91400   16.2700 -114.0500      14.2        27       176        94
VIS    2025250     91400   16.2700 -114.0600      14.4        27       176        95
VIS    2025250     91400   16.2700 -114.1000      13.7        26       182       100
VIS    2025250     91400   16.2800 -114.1200      12.7        23       183       100
VIS    2025250     91400   16.2900 -114.1400      13.4        22       183        97
VIS    2025250     91400   16.2600 -114.8500      14.4        21       177       100
VIS    2025250     91400   16.2500 -115.4800      13.2        29       176        98
VIS    2025250     91400   16.2300 -115.5200      13.4        31       173       100
VIS    2025250     91400   16.2500 -115.5500      11.3        38       164        92
VIS    2025250     91400   16.2300 -115.5600      10.1        35       162        98
VIS    2025250     91400   16.2300 -115.5900      12.1        32       162        95
VIS    2025250     91400   16.2400 -116.0900      14.3        42       171       100
VIS    2025250     91400   16.2200 -116.1300      14.7        43       167       100
VIS    2025250     91400   16.2300 -116.1400      14.7        44       167       100
VIS    2025250     91400   16.2300 -116.4000       9.9        40       165        94
VIS    2025250     91400   16.2200 -116.4200      10.9        37       165        97
VIS    2025250     91400   16.1700 -118.4800      10.0        81       188        97
VIS    2025250     91400   16.3700 -109.6600      11.9        56       191        97
VIS    2025250     91400   16.3700 -109.6900       5.6        58       190        91
VIS    2025250     91400   16.3800 -109.7000       5.1        62       190        97
VIS    2025250     91400   16.3300 -110.9100       5.9        11       187       100
VIS    2025250     91400   16.3300 -110.9300       5.9        16       187       100
VIS    2025250     91400   16.3200 -110.9700       5.8        27       189        99
VIS    2025250     91400   16.3100 -111.4000       9.2        53       184        98
VIS    2025250     91400   16.3100 -111.5300       8.6        58       181        97
VIS    2025250     91400   16.3100 -111.5400       8.5        57       181        97
VIS    2025250     91400   16.3300 -111.5600       8.9        54       182        99
VIS    2025250     91400   16.3000 -111.8600      11.6        62       171        93
VIS    2025250     91400   16.3000 -111.9300       9.8        41       177        99
VIS    2025250     91400   16.3100 -111.9700       9.6        45       173       100
VIS    2025250     91400   16.3200 -111.9800       9.7        47       177        99
VIS    2025250     91400   16.3000 -112.0200      10.7        51       182        96
VIS    2025250     91400   16.2900 -112.0900      16.0        46       173       100
VIS    2025250     91400   16.3000 -112.0900      16.0        47       173       100
VIS    2025250     91400   16.3100 -112.3100      20.5        43       174        98
VIS    2025250     91400   16.2900 -112.3500      21.0        47       171        94
VIS    2025250     91400   16.3000 -112.3800      22.3        51       172        91
VIS    2025250     91400   16.3100 -112.4100      22.7        51       173        95
VIS    2025250     91400   16.3000 -112.5400      11.7        27       165        95
VIS    2025250     91400   16.3000 -112.5900      20.0        45       168        99
VIS    2025250     91400   16.2900 -112.6300      18.5        43       168        98
VIS    2025250     91400   16.3000 -112.6400      18.4        43       168        97
VIS    2025250     91400   16.2800 -112.6800      18.6        43       164        97
VIS    2025250     91400   16.2900 -112.7500      18.8        38       161        98
VIS    2025250     91400   16.3000 -112.7700      18.6        38       161        98
VIS    2025250     91400   16.3000 -112.8000      18.3        37       164        94
VIS    2025250     91400   16.2700 -112.8100      18.3        38       165        90
VIS    2025250     91400   16.2900 -112.8400      18.0        34       165        99
VIS    2025250     91400   16.2700 -112.8800      20.1        44       167       100
VIS    2025250     91400   16.2900 -112.9300      12.2        11       171        97
VIS    2025250     91400   16.2900 -112.9700      14.3        27       170        98
VIS    2025250     91400   16.2900 -112.9900      14.8        27       170        99
VIS    2025250     91400   16.2800 -113.0300      15.7        30       166       100
VIS    2025250     91400   16.2900 -113.0400      16.8        34       166        97
VIS    2025250     91400   16.2800 -113.0800      18.1        38       168        97
VIS    2025250     91400   16.2700 -113.1000      17.3        38       168       100
VIS    2025250     91400   16.2800 -113.1400      18.3        37       165        99
VIS    2025250     91400   16.2700 -113.1700      21.4        24       168        93
VIS    2025250     91400   16.2700 -113.2600      16.4        28       165        91
VIS    2025250     91400   16.2700 -113.3200      12.6        29       165       100
VIS    2025250     91400   16.2700 -113.3600      12.6        33       168        90
VIS    2025250     91400   16.2800 -113.4000      17.9        34       170        98
VIS    2025250     91400   16.2800 -113.4200      11.0        38       170        98
VIS    2025250     91400   16.2600 -113.6000      16.4        29       164        92
VIS    2025250     91400   16.2600 -113.6300      15.4        28       165        97
VIS    2025250     91400   16.2500 -113.6600      15.0        27       168       100
VIS    2025250     91400   16.2700 -113.6700      14.3        27       168        99
VIS    2025250     91400   16.2500 -113.6900      14.8        26       169        93
VIS    2025250     91400   16.2700 -113.7400      15.1        25       169        97
VIS    2025250     91400   16.2700 -113.7500      15.2        25       173        98
VIS    2025250     91400   16.2500 -113.8000      12.9        19       176        92
VIS    2025250     91400   16.2700 -113.8500      14.6        21       177       100
VIS    2025250     91400   16.2600 -113.8600      13.9        22       177       100
VIS    2025250     91400   16.2600 -113.9100      13.1        28       177        94
VIS    2025250     91400   16.2600 -113.9200      13.1        25       177        97
VIS    2025250     91400   16.2600 -113.9500      13.0        24       177        99
VIS    2025250     91400   16.2600 -113.9900      12.5        29       177        98
VIS    2025250     91400   16.2600 -114.0100      12.4        27       176        92
VIS    2025250     91400   16.2600 -114.0500      14.2        26       176        95
VIS    2025250     91400   16.2400 -114.0700      14.0        26       178       100
VIS    2025250     91400   16.2600 -114.1000      13.8        26       182       100
VIS    2025250     91400   16.2600 -114.1200      13.0        22       183        98
VIS    2025250     91400   16.2400 -114.8300      13.6        19       177        94
VIS    2025250     91400   16.2300 -115.4700      12.7        26       176       100
VIS    2025250     91400   16.2100 -115.4900      12.7        29       174        99
VIS    2025250     91400   16.2200 -115.5100      12.9        29       173        99
VIS    2025250     91400   16.2200 -115.5600      10.2        34       167        97
VIS    2025250     91400   16.2300 -115.5600      10.2        35       164        97
VIS    2025250     91400   16.2000 -116.1600      14.8        43       170       100
VIS    2025250     91400   16.2000 -116.3800      14.6        36       161        92
VIS    2025250     91400   16.2000 -116.4000      11.9        33       161        97
VIS    2025250     91400   16.2000 -116.4300      11.2        37       165       100
VIS    2025250     91400   16.1800 -116.5100      11.8        29       168        99
VIS    2025250     91400   16.1900 -116.5200      11.4        29       168        99
VIS    2025250     91400   16.1600 -117.8500       7.1        25       189        92
VIS    2025250     91400   16.1500 -118.4300       9.3        74       186        93
VIS    2025250     91400   16.1500 -118.4400       9.0        70       187        97
VIS    2025250     91400   16.1600 -118.4800       9.5        77       184        95
VIS    2025250     91400   16.3200 -110.9400       5.6        17       187       100
VIS    2025250     91400   16.3100 -110.9600       5.3        26       187       100
VIS    2025250     91400   16.3000 -111.4000       9.6        51       181        98
VIS    2025250     91400   16.2900 -111.4300      10.5        51       178        92
VIS    2025250     91400   16.2900 -111.5000       9.5        61       183        91
VIS    2025250     91400   16.3000 -111.5400       7.8        60       183        99
VIS    2025250     91400   16.3000 -111.5700       8.0        57       183       100
VIS    2025250     91400   16.3000 -111.8700      11.4        61       172        92
VIS    2025250     91400   16.2900 -111.9100      10.0        45       179        99
VIS    2025250     91400   16.2900 -111.9300       9.8        41       178        99
VIS    2025250     91400   16.2900 -111.9500       9.8        42       177        99
VIS    2025250     91400   16.2900 -111.9900       9.9        46       179       100
VIS    2025250     91400   16.2900 -112.0700      17.6        48       175        97
VIS    2025250     91400   16.2800 -112.1600      15.6        47       173        99
VIS    2025250     91400   16.2700 -112.3200      19.5        43       174        97
VIS    2025250     91400   16.2800 -112.3400      20.9        47       172        93
VIS    2025250     91400   16.2800 -112.3700      18.5        45       172        91
VIS    2025250     91400   16.2600 -112.4900      18.9        39       168        92
VIS    2025250     91400   16.2700 -112.6000      19.9        44       169        96
VIS    2025250     91400   16.2700 -112.6200      18.2        42       167        98
VIS    2025250     91400   16.2700 -112.6400      18.0        43       167        98
VIS    2025250     91400   16.2600 -112.6900      17.8        40       164        92
VIS    2025250     91400   16.2600 -112.7800      15.3        43       166        99
VIS    2025250     91400   16.2600 -112.7900      15.0        43       166        98
VIS    2025250     91400   16.2500 -112.8300       7.8        13       170       100
VIS    2025250     91400   16.2600 -112.8700      20.0        44       169       100
VIS    2025250     91400   16.2500 -112.8900      20.0        44       173       100
VIS    2025250     91400   16.2500 -112.9000      20.1        43       169       100
VIS    2025250     91400   16.2700 -113.0000      15.3        30       170       100
VIS    2025250     91400   16.2600 -113.0200      15.8        31       170       100
VIS    2025250     91400   16.2600 -113.0600      16.8        34       170       100
VIS    2025250     91400   16.2500 -113.0800      16.5        37       170        99
VIS    2025250     91400   16.2600 -113.1000      17.0        39       169       100
VIS    2025250     91400   16.2500 -113.2500      15.6        27       166        98
VIS    2025250     91400   16.2500 -113.2900      14.1        27       165        96
VIS    2025250     91400   16.2500 -113.3200      13.5        29       167        97
VIS    2025250     91400   16.2500 -113.3400      13.2        30       168        96
VIS    2025250     91400   16.2400 -113.4100      12.4        31       175        98
VIS    2025250     91400   16.2500 -113.4100      12.6        30       175        96
VIS    2025250     91400   16.2400 -113.6300      14.2        27       167        95
VIS    2025250     91400   16.2300 -113.6500      13.9        28       168        99
VIS    2025250     91400   16.2400 -113.6700      14.6        26       169        99
VIS    2025250     91400   16.2400 -113.7200      15.0        24       173        95
VIS    2025250     91400   16.2300 -113.7300      15.1        23       175        96
VIS    2025250     91400   16.2300 -113.7700      13.9        18       176       100
VIS    2025250     91400   16.2400 -113.7900      12.6        19       176        93
VIS    2025250     91400   16.2200 -113.8200      13.5        19       177        96
VIS    2025250     91400   16.2400 -113.8500      13.6        20       177        97
VIS    2025250     91400   16.2300 -113.8800      11.9        32       177        98
VIS    2025250     91400   16.2300 -113.9000      12.0        35       177        98
VIS    2025250     91400   16.2300 -113.9600      10.8        28       172        95
VIS    2025250     91400   16.2200 -114.0300      14.4        25       177        97
VIS    2025250     91400   16.2400 -114.0400      14.0        26       177        99
VIS    2025250     91400   16.2200 -114.0800      13.9        26       179        98
VIS    2025250     91400   16.2400 -114.0900      13.5        27       180        99
VIS    2025250     91400   16.2200 -114.1300      14.5        24       189        97
VIS    2025250     91400   16.2300 -114.1600      15.9        21       190        97
VIS    2025250     91400   16.1900 -115.4900      12.7        33       176        96
VIS    2025250     91400   16.2000 -115.5200      12.1        28       173        98
VIS    2025250     91400   16.1900 -115.5600      11.4        26       169        95
VIS    2025250     91400   16.1900 -115.6200      11.5        34       170        99
VIS    2025250     91400   16.2000 -115.6200      11.3        36       170        98
VIS    2025250     91400   16.1900 -115.8100       7.1        24       169       100
VIS    2025250     91400   16.2000 -115.8100       6.9        23       171        99
VIS    2025250     91400   16.1700 -116.1400      15.4        38       171        98
VIS    2025250     91400   16.1800 -116.5100      11.9        29       168        99
VIS    2025250     91400   16.1400 -118.0700       4.6        20       191        95
VIS    2025250     91400   16.1400 -118.1000       4.3        17       190        99
VIS    2025250     91400   16.1200 -118.1200      10.4         9       189        90
VIS    2025250     91400   16.1400 -118.4300       9.1        68       187        99
VIS    2025250     91400   16.3200 -109.6900       9.8        49       191       100
VIS    2025250     91400   16.2800 -111.4000      11.0        42       183       100
VIS    2025250     91400   16.2700 -111.4300      11.3        55       178        91
VIS    2025250     91400   16.2800 -111.5000       8.4        64       183        98
VIS    2025250     91400   16.2800 -111.5100       9.3        63       182        94
VIS    2025250     91400   16.2800 -111.6000      10.5        51       181       100
VIS    2025250     91400   16.2600 -111.8800      13.3        59       175        96
VIS    2025250     91400   16.2700 -111.9200      10.1        43       179       100
VIS    2025250     91400   16.2500 -112.0300      17.9        50       177        98
VIS    2025250     91400   16.2600 -112.0600      18.9        50       174       100
VIS    2025250     91400   16.2600 -112.0900      19.0        49       173        98
VIS    2025250     91400   16.2600 -112.1100      15.3        43       170        94
VIS    2025250     91400   16.2600 -112.1300      15.1        42       170        96
VIS    2025250     91400   16.2400 -112.2400      12.9        57       186        99
VIS    2025250     91400   16.2500 -112.2500      12.6        56       186        95
VIS    2025250     91400   16.2400 -112.3500      18.5        46       172        98
VIS    2025250     91400   16.2500 -112.4300      10.4        45       166        91
VIS    2025250     91400   16.2500 -112.4600      19.6        43       170       100
VIS    2025250     91400   16.2500 -112.4800      19.1        39       167        96
VIS    2025250     91400   16.2300 -112.5200      19.3        41       170        97
VIS    2025250     91400   16.2500 -112.5800      19.6        44       166       100
VIS    2025250     91400   16.2300 -112.6600      15.8        49       167        97
VIS    2025250     91400   16.2300 -112.9000      20.0        44       174       100
VIS    2025250     91400   16.2400 -112.9000      20.1        43       173       100
VIS    2025250     91400   16.2200 -113.0300      16.2        33       174        91
VIS    2025250     91400   16.2300 -113.0500      15.9        33       173        98
VIS    2025250     91400   16.2200 -113.0900      17.3        38       170        95
VIS    2025250     91400   16.2300 -113.1100      16.8        39       169        98
VIS    2025250     91400   16.2200 -113.2400      14.3        25       166        91
VIS    2025250     91400   16.2300 -113.2500      14.4        25       166        91
VIS    2025250     91400   16.2300 -113.2800      13.5        29       166       100
VIS    2025250     91400   16.2200 -113.3300      13.1        29       170        99
VIS    2025250     91400   16.2200 -113.3300      13.3        29       171        98
VIS    2025250     91400   16.2200 -113.3700      12.7        29       175        92
VIS    2025250     91400   16.2200 -113.4000      12.6        31       175       100
VIS    2025250     91400   16.2100 -113.4400      13.0        28       174        97
VIS    2025250     91400   16.2300 -113.5600      15.0        22       167        95
VIS    2025250     91400   16.2000 -113.6300      12.8        29       168        99
VIS    2025250     91400   16.2100 -113.6400      13.4        28       168        99
VIS    2025250     91400   16.2100 -113.7000      15.8        23       176        95
VIS    2025250     91400   16.2100 -113.7200      16.4        23       176        98
VIS    2025250     91400   16.2200 -113.7300      15.8        23       176        98
VIS    2025250     91400   16.2000 -113.7800      14.1        21       178        99
VIS    2025250     91400   16.2000 -113.8100      13.8        21       178        99
VIS    2025250     91400   16.2100 -113.8100      13.7        20       177        97
VIS    2025250     91400   16.2200 -113.8600      13.3        20       178        92
VIS    2025250     91400   16.2100 -113.8800      11.8        33       177        97
VIS    2025250     91400   16.2000 -113.9200      11.5        36       171       100
VIS    2025250     91400   16.2000 -113.9300      11.0        35       171       100
VIS    2025250     91400   16.2000 -113.9600      11.1        32       172       100
VIS    2025250     91400   16.2000 -114.0100      13.2        28       177        95
VIS    2025250     91400   16.2000 -114.0200      13.9        26       178        98
VIS    2025250     91400   16.2100 -114.0600      14.0        26       179        97
VIS    2025250     91400   16.2100 -114.0700      13.9        26       179        97
VIS    2025250     91400   16.1800 -115.4500       6.4        19       183        90
VIS    2025250     91400   16.1800 -115.4600       6.5        20       178        91
VIS    2025250     91400   16.1700 -115.5400      12.3        26       170       100
VIS    2025250     91400   16.1700 -115.5400      12.3        28       169       100
VIS    2025250     91400   16.1700 -115.6000      12.0        33       170        99
VIS    2025250     91400   16.1700 -115.6500       9.7        45       173       100
VIS    2025250     91400   16.1500 -116.1300      15.6        36       171        99
VIS    2025250     91400   16.1000 -118.1100      12.2         9       190        98
VIS    2025250     91400   16.1200 -118.1200      10.9         8       189        92
VIS    2025250     91400   16.0900 -118.4100       4.3       101       187       100
VIS    2025250     91400   16.2600 -111.4300      11.3        50       180        94
VIS    2025250     91400   16.2600 -111.4700      12.0        60       183        93
VIS    2025250     91400   16.2500 -111.5400       8.5        66       180        92
VIS    2025250     91400   16.2500 -111.8900      13.3        59       175        96
VIS    2025250     91400   16.2200 -112.0100      13.7        53       176        98
VIS    2025250     91400   16.2400 -112.0500      16.7        51       176        99
VIS    2025250     91400   16.2400 -112.2100      12.9        57       182       100
VIS    2025250     91400   16.2400 -112.2400      12.9        57       186        99
VIS    2025250     91400   16.2100 -112.3300      17.5        51       172        96
VIS    2025250     91400   16.2100 -112.3400      17.4        51       172        97
VIS    2025250     91400   16.2300 -112.3600      16.4        50       174        98
VIS    2025250     91400   16.2200 -112.4400      19.4        48       175        91
VIS    2025250     91400   16.2200 -112.4500      19.6        48       175        94
VIS    2025250     91400   16.2100 -112.4800      19.7        41       172        98
VIS    2025250     91400   16.2300 -112.5100      19.4        41       170        97
VIS    2025250     91400   16.2200 -112.5900      20.0        44       168       100
VIS    2025250     91400   16.2200 -112.6600      15.7        49       167        98
VIS    2025250     91400   16.2200 -112.6800      15.5        48       167        99
VIS    2025250     91400   16.2200 -112.8000      15.1        43       170        98
VIS    2025250     91400   16.2000 -113.0800      10.2        37       173       100
VIS    2025250     91400   16.2100 -113.3000      13.0        31       168       100
VIS    2025250     91400   16.1900 -113.3300      12.9        30       171        99
VIS    2025250     91400   16.2100 -113.3300      13.3        29       171        98
VIS    2025250     91400   16.2000 -113.6300      12.5        30       168        99
VIS    2025250     91400   16.2000 -113.6500      13.1        28       168        98
VIS    2025250     91400   16.2000 -113.7000      16.0        23       176        94
VIS    2025250     91400   16.2000 -113.7500      15.7        22       179       100
VIS    2025250     91400   16.1900 -113.7800      15.2        23       178       100
VIS    2025250     91400   16.1800 -113.8000      15.2        23       178       100
VIS    2025250     91400   16.1900 -113.8200      14.0        21       178        97
VIS    2025250     91400   16.1800 -113.8600      12.3        26       176        91
VIS    2025250     91400   16.1700 -113.9000      11.2        34       170        91
VIS    2025250     91400   16.1900 -113.9200      11.5        35       170       100
VIS    2025250     91400   16.1900 -113.9300      11.2        35       170       100
VIS    2025250     91400   16.1900 -113.9800      12.7        29       173        97
VIS    2025250     91400   16.1800 -114.0000      13.5        28       176        99
VIS    2025250     91400   16.1800 -114.0200      13.8        27       178        94
VIS    2025250     91400   16.1900 -114.0500      14.0        25       178        98
VIS    2025250     91400   16.1500 -115.5300      12.4        26       172       100
VIS    2025250     91400   16.1500 -115.5500      11.7        25       167        92
VIS    2025250     91400   16.1300 -115.6000      12.9        30       168        98
VIS    2025250     91400   16.1300 -115.6300      13.6        27       171        99
VIS    2025250     91400   16.1300 -115.7100       8.0        35       170        91
VIS    2025250     91400   16.1400 -116.1000      10.7        40       169        95
VIS    2025250     91400   16.0800 -117.8400      19.2        14       182        99
VIS    2025250     91400   16.0900 -118.1100      13.9        10       190        98
VIS    2025250     91400   16.0900 -118.4600      14.2        42       189        94
VIS    2025250     91400   16.2400 -111.1700       5.5        66       192       100
VIS    2025250     91400   16.2300 -111.2600       9.9        43       181        99
VIS    2025250     91400   16.2300 -111.4100       7.3        71       190        96
VIS    2025250     91400   16.2100 -111.8100      10.8        48       181        95
VIS    2025250     91400   16.2000 -111.8500      11.1        49       177       100
VIS    2025250     91400   16.2000 -111.9600       8.5        61       183        94
VIS    2025250     91400   16.2000 -112.0000      13.0        58       175        98
VIS    2025250     91400   16.2100 -112.2600      19.8        45       180       100
VIS    2025250     91400   16.2100 -112.3400      17.4        51       172        97
VIS    2025250     91400   16.1900 -112.4100      18.1        49       173        98
VIS    2025250     91400   16.2000 -112.4200      18.3        49       174        99
VIS    2025250     91400   16.1900 -112.4600      17.7        49       172       100
VIS    2025250     91400   16.2000 -112.5000      19.7        42       172        98
VIS    2025250     91400   16.2000 -112.5100      19.9        41       172        98
VIS    2025250     91400   16.1800 -112.9300      18.6        28       176        91
VIS    2025250     91400   16.1800 -113.0600      10.3        39       174        93
VIS    2025250     91400   16.1700 -113.3300      13.3        25       176        97
VIS    2025250     91400   16.1700 -113.3400      13.5        24       176        95
VIS    2025250     91400   16.1700 -113.4200      15.2        42       172        97
VIS    2025250     91400   16.1700 -113.8000      15.5        24       178        99
VIS    2025250     91400   16.1700 -113.8200      15.4        24       178       100
VIS    2025250     91400   16.1500 -113.8700      11.8        32       175       100
VIS    2025250     91400   16.1500 -113.9000      11.4        33       171        95
VIS    2025250     91400   16.1600 -113.9100      11.4        34       170        94
VIS    2025250     91400   16.1500 -113.9800      13.2        31       173        97
VIS    2025250     91400   16.1200 -115.4600       6.9       354       176       100
VIS    2025250     91400   16.1300 -115.6200      12.9        29       168        99
VIS    2025250     91400   16.1000 -115.7200       9.1        50       173       100
VIS    2025250     91400   16.1000 -115.7500       9.8        51       171        96
VIS    2025250     91400   16.1000 -116.1300      10.1        39       173       100
VIS    2025250     91400   16.0900 -116.3200      12.7        26       172       100
VIS    2025250     91400   16.0900 -116.3400      12.4        34       173        96
VIS    2025250     91400   16.1000 -116.3500      12.7        37       173        94
VIS    2025250     91400   16.0900 -116.3800      13.1        35       173       100
VIS    2025250     91400   16.1000 -116.4200      13.2        32       168       100
VIS    2025250     91400   16.0600 -117.8400      14.8        40       177       100
VIS    2025250     91400   16.1900 -111.5300       8.7        73       186        99
VIS    2025250     91400   16.1900 -111.8200      10.4        47       181        99
VIS    2025250     91400   16.1800 -111.8400      10.9        48       180       100
VIS    2025250     91400   16.1800 -111.8600      11.0        49       178       100
VIS    2025250     91400   16.1900 -112.0200      13.2        57       175        97
VIS    2025250     91400   16.1700 -112.2100      15.9        44       178        97
VIS    2025250     91400   16.1800 -112.2800      22.5        50       178        92
VIS    2025250     91400   16.1800 -112.2900      13.3        49       173        99
VIS    2025250     91400   16.1700 -112.3800      17.5        49       169        93
VIS    2025250     91400   16.1800 -112.4200      18.1        50       173        98
VIS    2025250     91400   16.1800 -112.4500      18.3        50       173       100
VIS    2025250     91400   16.1800 -112.4800      17.9        48       169       100
VIS    2025250     91400   16.1700 -112.6000      19.9        41       169       100
VIS    2025250     91400   16.1800 -112.6000      20.0        41       168       100
VIS    2025250     91400   16.1600 -112.6600      17.9        43       168        92
VIS    2025250     91400   16.1500 -113.1300      12.4        33       174        96
VIS    2025250     91400   16.1500 -113.1500      12.4        32       174        94
VIS    2025250     91400   16.1600 -113.3400      13.2        24       176        97
VIS    2025250     91400   16.1600 -113.4300      15.0        41       172        99
VIS    2025250     91400   16.1400 -113.5300      18.3        30       166        93
VIS    2025250     91400   16.1400 -113.5700      18.5        29       166        93
VIS    2025250     91400   16.1500 -113.5700      18.8        30       166        95
VIS    2025250     91400   16.1300 -113.7400       9.7        31       184        97
VIS    2025250     91400   16.1300 -113.7500      10.2        27       184        99
VIS    2025250     91400   16.1300 -113.8500      18.5        32       174        95
VIS    2025250     91400   16.1400 -113.9000      11.7        32       171        99
VIS    2025250     91400   16.0900 -115.5000       9.1        39       171        92
VIS    2025250     91400   16.1000 -115.7200       9.7        53       173       100
VIS    2025250     91400   16.1000 -115.7500      10.4        54       171        97
VIS    2025250     91400   16.0800 -115.7800      12.5        56       172        96
VIS    2025250     91400   16.0800 -116.3400      12.4        35       173        97
VIS    2025250     91400   16.0700 -116.3600      12.8        35       174        99
VIS    2025250     91400   16.0800 -116.4000      13.4        35       172       100
VIS    2025250     91400   16.0800 -116.4300      13.3        33       171       100
VIS    2025250     91400   16.0700 -116.4400      12.8        33       171       100
VIS    2025250     91400   16.0400 -117.7700      19.1        55       175        94
VIS    2025250     91400   16.0300 -117.8200      15.9        48       173       100
VIS    2025250     91400   16.0500 -117.8400      15.1        40       175       100
VIS    2025250     91400   16.0400 -118.1000      11.6        16       186       100
VIS    2025250     91400   16.1700 -111.8200      10.4        47       181        99
VIS    2025250     91400   16.1700 -111.8400      10.9        48       181       100
VIS    2025250     91400   16.1600 -111.8600      11.0        48       177       100
VIS    2025250     91400   16.1500 -112.0800      14.0        47       179        96
VIS    2025250     91400   16.1400 -112.2300      19.5        48       178        91
VIS    2025250     91400   16.1400 -112.3700      19.4        49       171       100
VIS    2025250     91400   16.1400 -112.3800      19.4        48       171       100
VIS    2025250     91400   16.1500 -112.4100      14.1        50       169        93
VIS    2025250     91400   16.1400 -112.4500      18.2        49       169       100
VIS    2025250     91400   16.1500 -112.4800      18.2        48       169       100
VIS    2025250     91400   16.1500 -112.6500      18.5        43       168        95
VIS    2025250     91400   16.1400 -112.6900      18.8        40       172        91
VIS    2025250     91400   16.1400 -112.7300      18.3        34       172        91
VIS    2025250     91400   16.1200 -112.9500      20.7        29       173       100
VIS    2025250     91400   16.1300 -113.1200      12.2        35       174        97
VIS    2025250     91400   16.1300 -113.1500      12.4        32       174        94
VIS    2025250     91400   16.1200 -113.5400      18.4        30       166        94
VIS    2025250     91400   16.1300 -113.5600      18.5        30       166        93
VIS    2025250     91400   16.1200 -113.5800      18.7        30       166        95
VIS    2025250     91400   16.1200 -113.7500      10.0        31       186        99
VIS    2025250     91400   16.1000 -114.0400      16.5        30       179        96
VIS    2025250     91400   16.0500 -116.3700      13.2        34       174        90
VIS    2025250     91400   16.0500 -116.3900      13.2        35       174        99
VIS    2025250     91400   16.0400 -116.4200      12.9        31       175       100
VIS    2025250     91400   16.0600 -116.4500      12.9        32       173       100
VIS    2025250     91400   16.0500 -116.4600      12.9        33       173        96
VIS    2025250     91400   16.0200 -117.8100      16.2        50       173        99
VIS    2025250     91400   16.0300 -117.8200      16.0        48       173       100
VIS    2025250     91400   16.0200 -117.8500      16.2        41       173       100
VIS    2025250     91400   16.0100 -117.9300      15.3        24       174       100
VIS    2025250     91400   16.0100 -117.9600      13.2        31       179        95
VIS    2025250     91400   16.0200 -118.0900      12.5        14       185       100
VIS    2025250     91400   16.1300 -111.7400      10.4        46       185        96
VIS    2025250     91400   16.1200 -112.0300       9.6        53       178        99
VIS    2025250     91400   16.1200 -112.2500      19.1        46       178        91
VIS    2025250     91400   16.1200 -112.3000      13.5        52       185       100
VIS    2025250     91400   16.1300 -112.3300      19.8        48       175        96
VIS    2025250     91400   16.1300 -112.3600      19.8        48       175        98
VIS    2025250     91400   16.1300 -112.3900      19.9        47       175        98
VIS    2025250     91400   16.1300 -112.4200      14.2        51       170        94
VIS    2025250     91400   16.1300 -112.6800      17.5        41       171        97
VIS    2025250     91400   16.1100 -112.8900      14.4        24       174        91
VIS    2025250     91400   16.1100 -112.9200      19.7        29       173       100
VIS    2025250     91400   16.0900 -113.4800      18.1        30       170       100
VIS    2025250     91400   16.0900 -113.5000      18.9        29       170       100
VIS    2025250     91400   16.0800 -113.7600      11.8        32       185       100
VIS    2025250     91400   16.0800 -113.7800      11.6        32       181        96
VIS    2025250     91400   16.0900 -113.8300      12.6        30       176       100
VIS    2025250     91400   16.1000 -113.8400      12.7        30       175        98
VIS    2025250     91400   16.0800 -113.9900      14.1        27       177       100
VIS    2025250     91400   16.0800 -114.0100      14.7        29       178       100
VIS    2025250     91400   16.0800 -114.0400      14.2        27       182        97
VIS    2025250     91400   16.0700 -114.0800      14.1        26       186        93
VIS    2025250     91400   16.0400 -115.4800      14.6        43       167       100
VIS    2025250     91400   16.0500 -115.5200      14.4        39       167       100
VIS    2025250     91400   16.0500 -115.5500      14.4        37       165       100
VIS    2025250     91400   16.0200 -116.4400      13.4        31       176        99
VIS    2025250     91400   16.0200 -116.4400      13.3        30       176        99
VIS    2025250     91400   16.0200 -116.4700      13.6        31       173        93
VIS    2025250     91400   15.9900 -117.8100      17.0        51       173       100
VIS    2025250     91400   15.9800 -117.8200      17.2        52       173        98
VIS    2025250     91400   15.9500 -119.5900      14.7        37       181       100
VIS    2025250     91400   15.9500 -119.6000      14.3        35       186        97
VIS    2025250     91400   16.1200 -111.3900       8.2        48       186        91
VIS    2025250     91400   16.1200 -111.7400      11.0        49       184        95
VIS    2025250     91400   16.1200 -111.7500      10.8        47       184        98
VIS    2025250     91400   16.1000 -112.0100       9.9        56       180        90
VIS    2025250     91400   16.1200 -112.0300       9.6        54       178        99
VIS    2025250     91400   16.1000 -112.0600       9.6        57       179        97
VIS    2025250     91400   16.1100 -112.1200      14.2        52       181       100
VIS    2025250     91400   16.1200 -112.1200      13.4        54       183        99
VIS    2025250     91400   16.1000 -112.1700      13.0        55       181       100
VIS    2025250     91400   16.1100 -112.2900      13.4        53       185       100
VIS    2025250     91400   16.1100 -112.3200      13.5        53       185       100
VIS    2025250     91400   16.0900 -112.3500      16.6        48       176        98
VIS    2025250     91400   16.1100 -112.3700      20.0        47       175        99
VIS    2025250     91400   16.1000 -112.3900      19.9        47       175        99
VIS    2025250     91400   16.0900 -112.8300      11.4        11       179       100
VIS    2025250     91400   16.0900 -112.9100      10.9        39       175        98
VIS    2025250     91400   16.0700 -112.9600      10.7        45       175        96
VIS    2025250     91400   16.0900 -113.1500      11.9        21       172       100
VIS    2025250     91400   16.0600 -113.5400      16.6        38       170        98
VIS    2025250     91400   16.0500 -113.7600      12.5        31       180       100
VIS    2025250     91400   16.0500 -113.8000      12.1        33       177        96
VIS    2025250     91400   16.0700 -113.8300      12.6        31       176        99
VIS    2025250     91400   16.0700 -113.8400      12.6        31       175       100
VIS    2025250     91400   16.0700 -113.8800      12.7        30       175        98
VIS    2025250     91400   16.0700 -113.9100      12.6        30       175        99
VIS    2025250     91400   16.0600 -114.0000      14.1        29       178        99
VIS    2025250     91400   16.0700 -114.0100      14.3        28       178        99
VIS    2025250     91400   16.0600 -114.0400      14.4        27       182       100
VIS    2025250     91400   16.0500 -114.0700      15.3        26       185        99
VIS    2025250     91400   16.0100 -115.5100      14.5        38       165       100
VIS    2025250     91400   16.0300 -115.5200      14.5        40       167       100
VIS    2025250     91400   16.0100 -116.2600      18.0        40       171        93
VIS    2025250     91400   15.9700 -117.4100       4.7        59       188       100
VIS    2025250     91400   15.9700 -117.8400      16.9        51       173        94
VIS    2025250     91400   15.9800 -117.8500      16.8        51       173        93
VIS    2025250     91400   15.9200 -119.5400      18.4        38       181       100
VIS    2025250     91400   15.9200 -119.5500      18.3        39       180       100
VIS    2025250     91400   15.9400 -119.5900      15.5        36       179       100
VIS    2025250     91400   15.9400 -119.6100      15.1        34       180       100
VIS    2025250     91400   15.9300 -119.6300      15.2        32       180        95
VIS    2025250     91400   16.1100 -111.2500       7.5        56       191        98
VIS    2025250     91400   16.1100 -111.2700       7.1        59       189        97
VIS    2025250     91400   16.0900 -111.4000       7.3        49       187        94
VIS    2025250     91400   16.1100 -111.4500       9.3        48       187        94
VIS    2025250     91400   16.1000 -111.6100       9.4        45       190        98
VIS    2025250     91400   16.0900 -112.0400      10.2        56       179       100
VIS    2025250     91400   16.0900 -112.0500       9.8        56       179        98
VIS    2025250     91400   16.0700 -112.1300      16.8        52       182        98
VIS    2025250     91400   16.0900 -112.1600      14.2        55       182        91
VIS    2025250     91400   16.0700 -112.3600      14.5        51       176        92
VIS    2025250     91400   16.0700 -112.3600      14.6        52       176        92
VIS    2025250     91400   16.0600 -112.6800      19.5        49       178        94
VIS    2025250     91400   16.0600 -112.7200      19.3        44       174        99
VIS    2025250     91400   16.0700 -112.7400      18.5        42       172        95
VIS    2025250     91400   16.0600 -112.7600      18.2        41       173        95
VIS    2025250     91400   16.0600 -112.8400      19.4        34       180        92
VIS    2025250     91400   16.0700 -112.8900      16.5        27       175        90
VIS    2025250     91400   16.0500 -112.9300      10.3        45       178       100
VIS    2025250     91400   16.0600 -112.9400      10.6        46       176        97
VIS    2025250     91400   16.0600 -112.9700      11.0        45       177        97
VIS    2025250     91400   16.0600 -113.0900       8.1        20       181        98
VIS    2025250     91400   16.0600 -113.1700      14.2        29       175        97
VIS    2025250     91400   16.0300 -113.6100      16.7        35       176       100
VIS    2025250     91400   16.0400 -113.7900      12.2        33       177        98
VIS    2025250     91400   16.0500 -113.8200      14.2        30       175        91
VIS    2025250     91400   16.0400 -113.8700      14.1        32       177        92
VIS    2025250     91400   16.0400 -113.8800      14.0        32       175        96
VIS    2025250     91400   16.0400 -113.9100      14.4        30       175       100
VIS    2025250     91400   16.0400 -113.9400      14.3        30       175       100
VIS    2025250     91400   16.0300 -114.0000      11.9        35       181        98
VIS    2025250     91400   16.0300 -114.0100      12.3        33       182        99
VIS    2025250     91400   15.9600 -117.4200       4.8        57       188       100
VIS    2025250     91400   15.9600 -117.4200       4.7        60       186       100
VIS    2025250     91400   15.9500 -117.8600      16.7        50       173        93
VIS    2025250     91400   15.9500 -117.8800      16.1        46       173        99
VIS    2025250     91400   15.9300 -118.0400      25.2        92       182        94
VIS    2025250     91400   15.9100 -119.5700      18.2        38       178       100
VIS    2025250     91400   15.9000 -119.6000      17.4        37       179       100
VIS    2025250     91400   15.9100 -119.6000      16.6        37       179       100
VIS    2025250     91400   16.0800 -111.4000       6.8        49       191        94
VIS    2025250     91400   16.0800 -111.4400       6.1        41       189        97
VIS    2025250     91400   16.0800 -111.6200       8.8        38       187        94
VIS    2025250     91400   16.0700 -111.6500       9.1        48       190        92
VIS    2025250     91400   16.0700 -111.7400      13.2        55       186        99
VIS    2025250     91400   16.0600 -111.7800       8.4        56       186        98
VIS    2025250     91400   16.0700 -112.0900      15.9        50       181        99
VIS    2025250     91400   16.0400 -112.6900      19.9        49       180        90
VIS    2025250     91400   16.0400 -112.7100      19.3        48       178        93
VIS    2025250     91400   16.0500 -112.8400      19.9        35       180        90
VIS    2025250     91400   16.0400 -112.9200       9.9        46       178       100
VIS    2025250     91400   16.0500 -112.9600       9.9        45       178       100
VIS    2025250     91400   16.0200 -113.6200      16.8        35       176        98
VIS    2025250     91400   16.0200 -113.6200      16.8        35       176        99
VIS    2025250     91400   16.0200 -113.8900      14.2        32       175        99
VIS    2025250     91400   16.0200 -113.9100      15.0        30       175       100
VIS    2025250     91400   16.0200 -113.9500      16.5        32       177        99
VIS    2025250     91400   16.0000 -113.9600      16.2        28       179        91
VIS    2025250     91400   16.0000 -114.0100      12.9        29       182        97
VIS    2025250     91400   16.0000 -114.0200      13.0        27       185        99
VIS    2025250     91400   15.9300 -117.5000      10.9        49       182        93
VIS    2025250     91400   15.9300 -117.5200      10.7        50       182        93
VIS    2025250     91400   15.9100 -118.0300      25.8        92       181        98
VIS    2025250     91400   15.8700 -119.5400      16.9        33       190        97
VIS    2025250     91400   15.8900 -119.5700      18.0        37       178        99
VIS    2025250     91400   15.8900 -119.5800      18.0        37       178        99
VIS    2025250     91400   15.8900 -119.6000      17.3        36       182        99
VIS    2025250     91400   15.8800 -119.6300      16.1        37       183       100
VIS    2025250     91400   16.0500 -111.6400       9.3        44       190        98
VIS    2025250     91400   16.0600 -111.6500       9.3        45       190        98
VIS    2025250     91400   16.0300 -112.1600      21.5        48       179       100
VIS    2025250     91400   16.0200 -112.2200      19.2        49       178        91
VIS    2025250     91400   16.0300 -112.7200      19.3        49       179        95
VIS    2025250     91400   16.0300 -112.7500      14.3        37       172        90
VIS    2025250     91400   16.0000 -112.9600       9.9        57       177        94
VIS    2025250     91400   16.0000 -113.0000       9.9        56       179        95
VIS    2025250     91400   15.9900 -113.4800      14.0        46       174        91
VIS    2025250     91400   15.9800 -113.5900      10.9        52       178       100
VIS    2025250     91400   15.9900 -113.6000      12.2        51       178       100
VIS    2025250     91400   15.9800 -113.7100      10.5        42       182        92
VIS    2025250     91400   15.9800 -113.8800      11.2        35       170        90
VIS    2025250     91400   15.9800 -113.8800      11.2        35       170        90
VIS    2025250     91400   15.9800 -113.9900      16.5        19       183       100
VIS    2025250     91400   15.9400 -115.6300      15.6        31       167        96
VIS    2025250     91400   15.9500 -115.7300      14.4        44       170        90
VIS    2025250     91400   15.9000 -117.7800       9.2       106       181        91
VIS    2025250     91400   15.9000 -118.0300      25.8        92       181        98
VIS    2025250     91400   15.8700 -119.5100      17.5        21       192       100
VIS    2025250     91400   15.8600 -119.5300      17.5        28       190        98
VIS    2025250     91400   15.8500 -119.5700      18.0        33       182        99
VIS    2025250     91400   15.8600 -119.6300      14.7        38       183        95
VIS    2025250     91400   16.0100 -112.1100      21.8        50       179        97
VIS    2025250     91400   16.0100 -112.1200      21.7        49       181        96
VIS    2025250     91400   16.0200 -112.2200      19.2        49       178        90
VIS    2025250     91400   16.0100 -112.2300      19.2        49       177        91
VIS    2025250     91400   16.0000 -112.7400      14.2        38       174        98
VIS    2025250     91400   15.9800 -112.9300      12.5        72       186        98
VIS    2025250     91400   16.0000 -112.9500      10.0        59       177        93
VIS    2025250     91400   15.9900 -113.0000      10.2        58       179        95
VIS    2025250     91400   15.9600 -113.4500      14.9        46       171        99
VIS    2025250     91400   15.9600 -113.4700      14.2        48       172        93
VIS    2025250     91400   15.9600 -113.5400      11.5        48       175        97
VIS    2025250     91400   15.9800 -113.5500      12.4        47       172        99
VIS    2025250     91400   15.9800 -113.7300      10.4        42       181        93
VIS    2025250     91400   15.9600 -113.7500      10.3        45       180       100
VIS    2025250     91400   15.9600 -113.9900      15.1        21       183        99
VIS    2025250     91400   15.9500 -114.0000      14.5        21       183       100
VIS    2025250     91400   15.9100 -115.7200      26.1         6       164        99
VIS    2025250     91400   15.9200 -115.7400      13.8        49       169        98
VIS    2025250     91400   15.9100 -115.7500      13.4        51       170        95
VIS    2025250     91400   15.8800 -117.7500       7.4       105       178        92
VIS    2025250     91400   15.8200 -119.6000      15.6        35       185        96
VIS    2025250     91400   15.8300 -119.6100      15.9        35       185        97
VIS    2025250     91400   16.0000 -111.0400       8.6        28       192        96
VIS    2025250     91400   15.9900 -111.5600      10.4        51       190        97
VIS    2025250     91400   15.9800 -111.7500       5.8        79       182        92
VIS    2025250     91400   15.9900 -112.0800      17.6        52       184        91
VIS    2025250     91400   15.9900 -112.2100      18.2        51       178        97
VIS    2025250     91400   15.9800 -112.3400      15.1        42       179       100
VIS    2025250     91400   15.9600 -112.9200      16.9        61       184       100
VIS    2025250     91400   15.9600 -112.9200      12.6        75       186       100
VIS    2025250     91400   15.9600 -112.9500      12.7        74       185        98
VIS    2025250     91400   15.9600 -113.4400      14.9        46       171       100
VIS    2025250     91400   15.9600 -113.4800      14.6        46       172        99
VIS    2025250     91400   15.9400 -113.4900      16.0        47       172        99
VIS    2025250     91400   15.9500 -113.7100      10.8        38       181        91
VIS    2025250     91400   15.9500 -113.7200      10.5        41       180        91
VIS    2025250     91400   15.9500 -113.7500      10.0        46       180        93
VIS    2025250     91400   15.9400 -114.0000      14.0        23       183        95
VIS    2025250     91400   15.9400 -114.0000      13.9        23       183        93
VIS    2025250     91400   15.9000 -115.7200      26.0         6       164        99
VIS    2025250     91400   15.9000 -115.7600      13.3        51       176        97
VIS    2025250     91400   15.8500 -117.9500      17.3        30       179        99
VIS    2025250     91400   15.8100 -119.5900      20.0        28       186        98
VIS    2025250     91400   15.8100 -119.6100      19.8        29       185        96
VIS    2025250     91400   16.0500 -108.8900       5.8        63       188        91
VIS    2025250     91400   16.0200 -110.3400       8.4        53       192        97
VIS    2025250     91400   15.9900 -110.9300       8.0        17       188        98
VIS    2025250     91400   16.0000 -110.9700       8.1        29       191        95
VIS    2025250     91400   15.9700 -112.0500      15.6        47       184        96
VIS    2025250     91400   15.9600 -112.3300      15.1        43       181        99
VIS    2025250     91400   15.9600 -112.3700      15.1        43       176        99
VIS    2025250     91400   15.9500 -112.7500      13.6        41       178        96
VIS    2025250     91400   15.9500 -112.7700      13.8        40       178        95
VIS    2025250     91400   15.9400 -112.9000      17.2        58       184       100
VIS    2025250     91400   15.9400 -112.9700      12.8        77       185        99
VIS    2025250     91400   15.9200 -113.0900       9.6        48       189        99
VIS    2025250     91400   15.9300 -113.4400      17.2        43       174        92
VIS    2025250     91400   15.9200 -113.4500      16.9        44       174        97
VIS    2025250     91400   15.9200 -113.4800      17.1        44       177        98
VIS    2025250     91400   15.9000 -114.0700       4.3       233       184        99
VIS    2025250     91400   15.8700 -115.5700       9.8        32       170        93
VIS    2025250     91400   15.8100 -118.0700      18.4        54       182        99
VIS    2025250     91400   15.8000 -119.5900      22.1        23       186        94
VIS    2025250     91400   15.9600 -111.2700       7.3        36       190        90
VIS    2025250     91400   15.9500 -111.2900       7.4        37       189        95
VIS    2025250     91400   15.9500 -111.5800      10.2        46       188        94
VIS    2025250     91400   15.9500 -111.6200      10.5        45       186        99
VIS    2025250     91400   15.9300 -112.2600      17.0        37       181        99
VIS    2025250     91400   15.9200 -112.2800      22.7        39       180       100
VIS    2025250     91400   15.9100 -112.6200      10.5        43       177        91
VIS    2025250     91400   15.9300 -112.7400      12.9        39       178        98
VIS    2025250     91400   15.9300 -112.7800      12.9        37       178       100
VIS    2025250     91400   15.9200 -112.8100      12.6        34       178        99
VIS    2025250     91400   15.9100 -112.9100      17.5        55       178       100
VIS    2025250     91400   15.9100 -112.9500      17.6        55       184        99
VIS    2025250     91400   15.9200 -113.0900       9.9        50       189        99
VIS    2025250     91400   15.9000 -113.4500      16.6        42       181        95
VIS    2025250     91400   15.9000 -113.6700       7.9       241       183        94
VIS    2025250     91400   15.8400 -115.5100      17.1        52       170        92
VIS    2025250     91400   15.8400 -115.5200      17.0        51       170        93
VIS    2025250     91400   15.8000 -117.2900       4.4        96       179       100
VIS    2025250     91400   15.7900 -118.0700      18.7        56       181        96
VIS    2025250     91400   15.9300 -111.3000       6.5        37       189        90
VIS    2025250     91400   15.9200 -111.5900       9.9        47       187        98
VIS    2025250     91400   15.9100 -111.9600       5.1        56       188        93
VIS    2025250     91400   15.9100 -112.0300       9.9        44       180       100
VIS    2025250     91400   15.9200 -112.2900      22.7        39       183       100
VIS    2025250     91400   15.9000 -112.7900      11.8        37       178        97
VIS    2025250     91400   15.8800 -112.8500      14.0        62       177        92
VIS    2025250     91400   15.8800 -112.8700      13.6        62       177        96
VIS    2025250     91400   15.9000 -112.9200      18.3        52       188        99
VIS    2025250     91400   15.8700 -113.9400      17.1        25       184        97
VIS    2025250     91400   15.8500 -113.9800      15.8        21       180       100
VIS    2025250     91400   15.8200 -115.4300      18.2        33       160        92
VIS    2025250     91400   15.8100 -115.7100      18.8        46       173        96
VIS    2025250     91400   15.7900 -117.3000       4.5        97       179        99
VIS    2025250     91400   15.7800 -117.3100       4.2        94       179       100
VIS    2025250     91400   15.7800 -117.7700       4.6        39       171        92
VIS    2025250     91400   15.7600 -117.8600       5.3        34       170        93
VIS    2025250     91400   15.7400 -119.5200      11.9        62       183        93
VIS    2025250     91400   15.7400 -119.5900       7.2        72       172        94
VIS    2025250     91400   15.7300 -119.6100       7.1        84       161        99
VIS    2025250     91400   15.7400 -119.6200       7.1        85       161        97
VIS    2025250     91400   15.9300 -110.7500      14.0        62       191        99
VIS    2025250     91400   15.9100 -111.2800       5.5        39       188        92
VIS    2025250     91400   15.8900 -111.4400       6.9        27       188        99
VIS    2025250     91400   15.8900 -111.5300      10.9        45       184       100
VIS    2025250     91400   15.8900 -111.5700      10.5        52       188       100
VIS    2025250     91400   15.9000 -111.6000       9.6        58       189       100
VIS    2025250     91400   15.8800 -112.0100       8.3        48       182        94
VIS    2025250     91400   15.8800 -112.1600      14.9        44       185        97
VIS    2025250     91400   15.8600 -113.3300      11.0        38       181        96
VIS    2025250     91400   15.8400 -113.3600      12.6        34       182        99
VIS    2025250     91400   15.8600 -113.3700      12.1        35       181        95
VIS    2025250     91400   15.8600 -113.4700      16.5        37       181        95
VIS    2025250     91400   15.8500 -113.6200      14.4        31       181        98
VIS    2025250     91400   15.8400 -113.9900      15.7        21       180        98
VIS    2025250     91400   15.7200 -119.6100       7.1        84       161        99
VIS    2025250     91400   15.8800 -111.4600       6.9        29       189        97
VIS    2025250     91400   15.8700 -111.5200      10.6        47       187        96
VIS    2025250     91400   15.8700 -111.5400      10.8        47       186        99
VIS    2025250     91400   15.8700 -111.5700      10.9        51       188        99
VIS    2025250     91400   15.8600 -111.5900      11.3        53       189       100
VIS    2025250     91400   15.8500 -111.9700       6.0        35       190        91
VIS    2025250     91400   15.8700 -112.0200       8.2        45       184        94
VIS    2025250     91400   15.8600 -112.1900      20.3        43       185        99
VIS    2025250     91400   15.8500 -112.2100      20.4        42       183       100
VIS    2025250     91400   15.8400 -112.8100      16.7        53       177        93
VIS    2025250     91400   15.8300 -113.3300      11.4        36       181        96
VIS    2025250     91400   15.8400 -113.3700      12.7        33       182        99
VIS    2025250     91400   15.8300 -113.4400      18.2        31       183        95
VIS    2025250     91400   15.8200 -113.5500      17.8        30       183       100
VIS    2025250     91400   15.8200 -113.5700      17.9        30       185       100
VIS    2025250     91400   15.8100 -113.7800       4.1       114       175        98
VIS    2025250     91400   15.8200 -113.9900      15.9        21       184       100
VIS    2025250     91400   15.7700 -115.3600      14.2        27       162        94
VIS    2025250     91400   15.7700 -115.4000      13.5        26       160        93
VIS    2025250     91400   15.7700 -115.4200      12.7        23       160        92
VIS    2025250     91400   15.7800 -115.4900      20.3        26       165       100
VIS    2025250     91400   15.7700 -115.5000      20.6        26       165        99
VIS    2025250     91400   15.7600 -115.6400      17.1        53       181       100
VIS    2025250     91400   15.7300 -117.2100      14.7        10       184       100
VIS    2025250     91400   15.7200 -117.7200       5.8        32       167        95
VIS    2025250     91400   15.7100 -118.5100       9.8        50       184        97
VIS    2025250     91400   15.8600 -111.5300      10.6        48       187        97
VIS    2025250     91400   15.8600 -111.5500      10.8        47       186       100
VIS    2025250     91400   15.8600 -111.5800      11.6        51       188       100
VIS    2025250     91400   15.8600 -111.6000      11.7        52       188       100
VIS    2025250     91400   15.8600 -111.6400      13.3        56       189        97
VIS    2025250     91400   15.8400 -111.7900      14.5        66       189        92
VIS    2025250     91400   15.8300 -112.2000      20.3        42       179        99
VIS    2025250     91400   15.8200 -112.2200      20.3        42       183       100
VIS    2025250     91400   15.8200 -112.5200      15.2        52       183       100
VIS    2025250     91400   15.8300 -112.5500      15.7        47       183        95
VIS    2025250     91400   15.8100 -112.6800      13.8        53       179        96
VIS    2025250     91400   15.8300 -112.7000      12.7        60       178        95
VIS    2025250     91400   15.8200 -112.7400      16.9        35       174        99
VIS    2025250     91400   15.8300 -112.7600      17.1        35       173        99
VIS    2025250     91400   15.8300 -112.8200      18.2        46       177        99
VIS    2025250     91400   15.8300 -112.8500      18.6        44       177        99
VIS    2025250     91400   15.7900 -113.7700       4.1       116       175        97
VIS    2025250     91400   15.7600 -115.3800      14.7        27       162        98
VIS    2025250     91400   15.7600 -115.3900      14.4        27       162        98
VIS    2025250     91400   15.7600 -115.5000      20.8        26       165       100
VIS    2025250     91400   15.7500 -115.5400      23.6        37       173        93
VIS    2025250     91400   15.7600 -115.6000      16.7        64       180        97
VIS    2025250     91400   15.7500 -115.6300      16.8        52       181       100
VIS    2025250     91400   15.7400 -115.6400      16.7        49       183        99
VIS    2025250     91400   15.7200 -117.2000      14.7        10       184       100
VIS    2025250     91400   15.7200 -117.2100      14.8        10       184       100
VIS    2025250     91400   15.7000 -117.6200      12.7        36       176        95
VIS    2025250     91400   15.6900 -117.7500       5.2        35       166        98
VIS    2025250     91400   15.6900 -117.7500       5.2        35       166        97
VIS    2025250     91400   15.7100 -117.8300       8.0         6       167        97
VIS    2025250     91400   15.6900 -117.8500       9.0         1       167        99
VIS    2025250     91400   15.7000 -117.8700       8.5       357       167        93
VIS    2025250     91400   15.6900 -118.4500      17.5        34       184        95
VIS    2025250     91400   15.6600 -119.4700      19.9        58       164        99
VIS    2025250     91400   15.8400 -111.5200      10.6        47       188        96
VIS    2025250     91400   15.8200 -111.5600      10.5        48       189        99
VIS    2025250     91400   15.8100 -111.7700      14.8        65       189        92
VIS    2025250     91400   15.8300 -111.7800      14.7        66       189        93
VIS    2025250     91400   15.8100 -111.9100      10.9        38       184        98
VIS    2025250     91400   15.8100 -111.9600      11.0        36       188        96
VIS    2025250     91400   15.7900 -112.4900      14.7        53       183       100
VIS    2025250     91400   15.8000 -112.5000      15.0        52       184        99
VIS    2025250     91400   15.7900 -112.5500      17.1        46       183        96
VIS    2025250     91400   15.8100 -112.5600      17.6        43       182        91
VIS    2025250     91400   15.8000 -112.6800      14.3        50       182        96
VIS    2025250     91400   15.8000 -112.7100      13.7        55       175        94
VIS    2025250     91400   15.7900 -112.7300      13.4        57       175        93
VIS    2025250     91400   15.7900 -112.8200      20.1        39       177        97
VIS    2025250     91400   15.7900 -112.8500      20.4        39       180        98
VIS    2025250     91400   15.7700 -113.2600       4.2        95       178       100
VIS    2025250     91400   15.7700 -113.2700       4.4        89       178        98
VIS    2025250     91400   15.7200 -115.3300      16.9        30       167        93
VIS    2025250     91400   15.7200 -115.3500      17.0        31       166        92
VIS    2025250     91400   15.7300 -115.3700      16.8        34       166        99
VIS    2025250     91400   15.7400 -115.4000      14.6        29       162        90
VIS    2025250     91400   15.7200 -115.4500      16.6        19       161       100
VIS    2025250     91400   15.7300 -115.6100      16.8        56       180        96
VIS    2025250     91400   15.6900 -117.6100      12.2        31       177       100
VIS    2025250     91400   15.6700 -117.7100      27.0        14       168        90
VIS    2025250     91400   15.6900 -117.7600       5.2        36       166        97
VIS    2025250     91400   15.6800 -117.8000       8.3        34       166        94
VIS    2025250     91400   15.6800 -117.8200       7.8        29       166        96
VIS    2025250     91400   15.6900 -117.8500       9.2       358       167        97
VIS    2025250     91400   15.6600 -117.9200       6.3         6       172        99
VIS    2025250     91400   15.6700 -118.0600      17.7        30       173        93
VIS    2025250     91400   15.6500 -118.4200      20.1        37       179       100
VIS    2025250     91400   15.6500 -118.4200      20.1        37       179       100
VIS    2025250     91400   15.6600 -118.4500      19.3        32       184        94
VIS    2025250     91400   15.6400 -119.4700      20.6        60       160       100
VIS    2025250     91400   15.8300 -110.3100       7.4        21       191        98
VIS    2025250     91400   15.8000 -111.9400      11.0        36       188        96
VIS    2025250     91400   15.8000 -111.9500      11.0        36       187        96
VIS    2025250     91400   15.7700 -112.4500      12.9        56       178        94
VIS    2025250     91400   15.7900 -112.5100      15.3        52       184       100
VIS    2025250     91400   15.7700 -112.5300      17.0        49       186        98
VIS    2025250     91400   15.7700 -112.6400      14.9        43       182       100
VIS    2025250     91400   15.7700 -112.6600      15.0        44       183       100
VIS    2025250     91400   15.7700 -112.7200      21.6        38       179       100
VIS    2025250     91400   15.7600 -112.7400      20.8        40       179       100
VIS    2025250     91400   15.7800 -112.8400      20.9        38       185       100
VIS    2025250     91400   15.7600 -113.2600       4.2        93       179        96
VIS    2025250     91400   15.7500 -113.2700       4.1        90       179        94
VIS    2025250     91400   15.7400 -114.0300       6.1       211       187        99
VIS    2025250     91400   15.7400 -114.0300       6.2       209       188       100
VIS    2025250     91400   15.7100 -115.3600      16.9        32       166        93
VIS    2025250     91400   15.7100 -115.3700      17.4        34       166        98
VIS    2025250     91400   15.7100 -115.6600      15.7        43       182        98
VIS    2025250     91400   15.6500 -117.7300      27.1        14       168        90
VIS    2025250     91400   15.6600 -117.8200       8.1        30       166        95
VIS    2025250     91400   15.6400 -117.8600      13.2       356       170        97
VIS    2025250     91400   15.6600 -117.9000       6.2       357       170        90
VIS    2025250     91400   15.6500 -117.9300       6.5        13       174        90
VIS    2025250     91400   15.6300 -118.4100      20.0        40       171        99
VIS    2025250     91400   15.6400 -118.4300      21.2        41       177        96
VIS    2025250     91400   15.6300 -118.4600      22.9        44       177        94
VIS    2025250     91400   15.6300 -118.5700      17.7        43       178       100
VIS    2025250     91400   15.6300 -118.6000      18.2        46       178        97
VIS    2025250     91400   15.6200 -119.4700      20.5        61       160        99
VIS    2025250     91400   15.6100 -119.4800      20.3        64       149        99
VIS    2025250     91400   15.8200 -110.3200       7.0        25       191       100
VIS    2025250     91400   15.7700 -111.5100       9.4        38       191        96
VIS    2025250     91400   15.7700 -112.0900       9.2        15       190        98
VIS    2025250     91400   15.7500 -112.1900       9.8        47       180       100
VIS    2025250     91400   15.7700 -112.1900       9.5        44       180        99
VIS    2025250     91400   15.7600 -112.2600      23.1        40       180        98
VIS    2025250     91400   15.7700 -112.2900      23.7        41       182       100
VIS    2025250     91400   15.7600 -112.4600      12.9        56       178        93
VIS    2025250     91400   15.7600 -112.4900      13.8        54       183        97
VIS    2025250     91400   15.7600 -112.5100      14.2        53       186        99
VIS    2025250     91400   15.7400 -112.5900      15.5        44       180       100
VIS    2025250     91400   15.7600 -112.6500      15.0        41       184       100
VIS    2025250     91400   15.7400 -112.6900      19.4        42       184        99
VIS    2025250     91400   15.7500 -112.7300      20.9        41       179       100
VIS    2025250     91400   15.7600 -112.7300      20.8        41       179       100
VIS    2025250     91400   15.7400 -112.7700      18.1        33       178        96
VIS    2025250     91400   15.7200 -113.2200       8.1        64       175       100
VIS    2025250     91400   15.7400 -113.2800       4.1        91       179        92
VIS    2025250     91400   15.7200 -113.3600      14.8        37       184       100
VIS    2025250     91400   15.7300 -113.6200       4.5       101       165        99
VIS    2025250     91400   15.7200 -113.8100       9.1        50       173        91
VIS    2025250     91400   15.7000 -114.0600       4.6       220       190        95
VIS    2025250     91400   15.7100 -114.0700       4.4       221       190        91
VIS    2025250     91400   15.6700 -115.4300      16.7        20       168        90
VIS    2025250     91400   15.6700 -115.5800      19.8        64       172        95
VIS    2025250     91400   15.6700 -115.6500      15.1        41       175        97
VIS    2025250     91400   15.6200 -117.7600      15.4        43       164       100
VIS    2025250     91400   15.6400 -117.8600      13.5       356       170        93
VIS    2025250     91400   15.6100 -118.4000      19.3        39       170        94
VIS    2025250     91400   15.6000 -118.4700      22.0        41       170       100
VIS    2025250     91400   15.6000 -118.5000      20.3        38       169        90
VIS    2025250     91400   15.6200 -118.5600      18.9        39       177        93
VIS    2025250     91400   15.6000 -118.5800      17.4        42       175       100
VIS    2025250     91400   15.6200 -118.6000      19.5        42       178        90
VIS    2025250     91400   15.5800 -119.4800      19.8        68       141        98
VIS    2025250     91400   15.6000 -119.4800      20.3        63       149       100
VIS    2025250     91400   15.7500 -111.4900       9.2        40       189       100
VIS    2025250     91400   15.7300 -112.1000      10.4        19       191        99
VIS    2025250     91400   15.7400 -112.1400       9.5        18       191        99
VIS    2025250     91400   15.7300 -112.1800      10.0        49       182        99
VIS    2025250     91400   15.7500 -112.2000       9.8        47       181       100
VIS    2025250     91400   15.7400 -112.4900      12.9        57       179        94
VIS    2025250     91400   15.7200 -112.6200      16.7        38       185       100
VIS    2025250     91400   15.7300 -112.6900      19.2        41       184        97
VIS    2025250     91400   15.7300 -112.7200      21.4        42       182       100
VIS    2025250     91400   15.7300 -112.7400      20.4        41       181       100
VIS    2025250     91400   15.7100 -113.2200       7.3        67       175        94
VIS    2025250     91400   15.7200 -113.2200       7.2        67       176        92
VIS    2025250     91400   15.7100 -113.3500      14.9        39       181        98
VIS    2025250     91400   15.6800 -114.0400       5.3       212       188        94
VIS    2025250     91400   15.6800 -114.0400       5.1       215       188        93
VIS    2025250     91400   15.6500 -115.4000      18.7        18       166        94
VIS    2025250     91400   15.6700 -115.4200      17.3        18       166        99
VIS    2025250     91400   15.6500 -115.5100       5.6        29       166        95
VIS    2025250     91400   15.6400 -115.5900      17.2        66       173        98
VIS    2025250     91400   15.6500 -115.6000      17.9        64       173       100
VIS    2025250     91400   15.6500 -115.6600      15.0        42       175        99
VIS    2025250     91400   15.6400 -115.7500      15.5        19       177        98
VIS    2025250     91400   15.6000 -117.5800      19.3        48       176        98
VIS    2025250     91400   15.6100 -117.8200      14.5        26       164       100
VIS    2025250     91400   15.5900 -118.4800      21.2        36       169        99
VIS    2025250     91400   15.5900 -118.5400      17.0        43       163        96
VIS    2025250     91400   15.5800 -118.5800      16.7        42       166        96
VIS    2025250     91400   15.5900 -118.6000      16.6        41       174        95
VIS    2025250     91400   15.5800 -118.6400      15.5        31       178        98
VIS    2025250     91400   15.7300 -111.0600       6.7        30       191        94
VIS    2025250     91400   15.7400 -111.0800       6.4        26       191        92
VIS    2025250     91400   15.7300 -111.2600      15.7        46       189        98
VIS    2025250     91400   15.7300 -111.4500       5.5        37       189        90
VIS    2025250     91400   15.7200 -112.1300      10.2        20       191        97
VIS    2025250     91400   15.7000 -112.7000      19.4        40       185        94
VIS    2025250     91400   15.6900 -113.1900       6.1        58       178        96
VIS    2025250     91400   15.7000 -113.2000       6.9        62       175        99
VIS    2025250     91400   15.6800 -113.2400       8.3        56       174        96
VIS    2025250     91400   15.6900 -113.2600       8.3        62       175        93
VIS    2025250     91400   15.6600 -114.0100       5.1       218       185        95
VIS    2025250     91400   15.6600 -114.0400       5.5       216       185        97
VIS    2025250     91400   15.6600 -114.0500       5.3       222       186        92
VIS    2025250     91400   15.6300 -115.2700      16.6        42       160        93
VIS    2025250     91400   15.6300 -115.3500      12.0        19       160        95
VIS    2025250     91400   15.6300 -115.3500      12.1        20       160        95
VIS    2025250     91400   15.6400 -115.4100      18.7        18       166        94
VIS    2025250     91400   15.6300 -115.5000       4.7        31       166        94
VIS    2025250     91400   15.6300 -115.6000      16.9        67       172        98
VIS    2025250     91400   15.6400 -115.6000      17.2        65       173       100
VIS    2025250     91400   15.6200 -115.6300      17.1        61       175        98
VIS    2025250     91400   15.6100 -115.8100      13.0        12       169        92
VIS    2025250     91400   15.5800 -117.5500      20.3        49       176        90
VIS    2025250     91400   15.5800 -117.5600      20.2        48       176        90
VIS    2025250     91400   15.5900 -117.5800      19.6        47       176        97
VIS    2025250     91400   15.5800 -117.7300      11.6        27       168        96
VIS    2025250     91400   15.5700 -117.7800      12.7        31       166       100
VIS    2025250     91400   15.5900 -117.8100      11.6        33       165        98
VIS    2025250     91400   15.5800 -117.8300      12.3        31       166       100
VIS    2025250     91400   15.5600 -118.4800      17.9         4       167        94
VIS    2025250     91400   15.5600 -118.5100      18.2        40       162       100
VIS    2025250     91400   15.5500 -118.5200      18.2        41       162       100
VIS    2025250     91400   15.5500 -118.5600      18.0        44       162        99
VIS    2025250     91400   15.5500 -118.5700      18.2        44       162        99
VIS    2025250     91400   15.5600 -118.6100      18.2        45       162        99
VIS    2025250     91400   15.5600 -118.6400      15.2        35       178       100
VIS    2025250     91400   15.5300 -119.6600      28.1        41       124        95
VIS    2025250     91400   15.7200 -111.0300       7.9        37       189        96
VIS    2025250     91400   15.7300 -111.0600       7.0        31       189        94
VIS    2025250     91400   15.7300 -111.0700       6.8        31       189        93
VIS    2025250     91400   15.7100 -111.1100       5.2         0       188        96
VIS    2025250     91400   15.7100 -111.1400       4.9       350       189       100
VIS    2025250     91400   15.7200 -111.2500      15.4        47       189        95
VIS    2025250     91400   15.7100 -111.4700       5.0        34       189        98
VIS    2025250     91400   15.6700 -112.6600      15.4        46       189        99
VIS    2025250     91400   15.6700 -112.7400      21.8        35       188       100
VIS    2025250     91400   15.6500 -113.2100       6.1        53       177        96
VIS    2025250     91400   15.6600 -113.2400       8.7        52       174        92
VIS    2025250     91400   15.6600 -113.2600       8.9        53       177        97
VIS    2025250     91400   15.6500 -113.5300       4.2        77       187        94
VIS    2025250     91400   15.6500 -113.9900       4.7       217       186        95
VIS    2025250     91400   15.6400 -114.0100       5.0       221       186        99
VIS    2025250     91400   15.6400 -114.0500       5.6       225       186        99
VIS    2025250     91400   15.6400 -114.0600       5.6       228       186        97
VIS    2025250     91400   15.6300 -114.2400       4.3       252       187        94
VIS    2025250     91400   15.6000 -115.2700      18.6        46       159        92
VIS    2025250     91400   15.6100 -115.2800      16.4        47       159        94
VIS    2025250     91400   15.6200 -115.3200      11.9        17       159        95
VIS    2025250     91400   15.6100 -115.3400      11.7        18       159        93
VIS    2025250     91400   15.6200 -115.3700      11.9        18       160        97
VIS    2025250     91400   15.5900 -115.5700      16.6        66       171        95
VIS    2025250     91400   15.6100 -115.6300      17.2        59       175        98
VIS    2025250     91400   15.6000 -115.6400      17.4        54       175       100
VIS    2025250     91400   15.6100 -115.7200      18.0        42       174        96
VIS    2025250     91400   15.5700 -117.5800      20.2        48       176        92
VIS    2025250     91400   15.5600 -117.5900      20.5        47       176        92
VIS    2025250     91400   15.5500 -117.6300      19.6        47       181        99
VIS    2025250     91400   15.5500 -117.6600      18.9        47       181        97
VIS    2025250     91400   15.5700 -117.7400      12.1        29       167       100
VIS    2025250     91400   15.5500 -117.7600      12.9        31       167       100
VIS    2025250     91400   15.5600 -117.7800      12.8        32       167       100
VIS    2025250     91400   15.5500 -117.8000      13.5        33       169        99
VIS    2025250     91400   15.5500 -117.8500      17.5        39       170       100
VIS    2025250     91400   15.5400 -117.8700      18.3        38       170        95
VIS    2025250     91400   15.5300 -118.3500      14.9        33       174        99
VIS    2025250     91400   15.5500 -118.3600      17.1        32       174        95
VIS    2025250     91400   15.5500 -118.4100      17.9        36       172        95
VIS    2025250     91400   15.5300 -118.5000      18.7        42       166        96
VIS    2025250     91400   15.5300 -118.5300      19.6        43       165        99
VIS    2025250     91400   15.5500 -118.5700      19.5        40       161        95
VIS    2025250     91400   15.5500 -118.5700      19.6        40       162        94
VIS    2025250     91400   15.5300 -118.6200      17.2        37       160        97
VIS    2025250     91400   15.5400 -118.6500      15.5        38       167        99
VIS    2025250     91400   15.5200 -119.6500      28.3        41       124        93
VIS    2025250     91400   15.5100 -119.6600      28.3        41       124        93
VIS    2025250     91400   15.6900 -110.7900       5.0        49       189        93
VIS    2025250     91400   15.7000 -110.8300       5.8        53       189        90
VIS    2025250     91400   15.6900 -111.0500       7.7        35       190        99
VIS    2025250     91400   15.6900 -111.1000       5.6         3       188        95
VIS    2025250     91400   15.7000 -111.1100       5.0       357       188        93
VIS    2025250     91400   15.7000 -111.1300       5.0       349       188       100
VIS    2025250     91400   15.6500 -112.6800      18.3        34       190        97
VIS    2025250     91400   15.6400 -112.7000      21.0        37       188        94
VIS    2025250     91400   15.6600 -112.7300      21.5        37       189        98
VIS    2025250     91400   15.6400 -113.2000       5.9        53       177        95
VIS    2025250     91400   15.6500 -113.2100       6.1        52       177        97
VIS    2025250     91400   15.6500 -113.2400       9.0        47       177        91
VIS    2025250     91400   15.6400 -113.2600       9.2        48       177        96
VIS    2025250     91400   15.6400 -113.4200       7.9        58       176        98
VIS    2025250     91400   15.6400 -113.4500       7.8        59       176        99
VIS    2025250     91400   15.6300 -113.5400       4.0        75       187        96
VIS    2025250     91400   15.6200 -113.9900       4.8       213       187        90
VIS    2025250     91400   15.6300 -114.0000       5.0       217       187        99
VIS    2025250     91400   15.6100 -114.0500       5.8       231       187        98
VIS    2025250     91400   15.6200 -114.0800       6.0       229       188        99
VIS    2025250     91400   15.6300 -114.0800       6.0       230       189        99
VIS    2025250     91400   15.6100 -114.2200       4.0       262       186       100
VIS    2025250     91400   15.6100 -114.2200       4.0       262       186       100
VIS    2025250     91400   15.5800 -115.1700      21.1        26       163        96
VIS    2025250     91400   15.6000 -115.1900      21.1        26       163        96
VIS    2025250     91400   15.5900 -115.2600      18.7        47       159        93
VIS    2025250     91400   15.6000 -115.3000      16.4        47       159        90
VIS    2025250     91400   15.5800 -115.5800      17.4        51       169        95
VIS    2025250     91400   15.5900 -115.6000      16.7        65       171        98
VIS    2025250     91400   15.5700 -115.7800      17.0        28       171        97
VIS    2025250     91400   15.5300 -117.5400      11.4        29       182        93
VIS    2025250     91400   15.5400 -117.5800      20.0        44       184       100
VIS    2025250     91400   15.5300 -117.6100      20.3        44       182       100
VIS    2025250     91400   15.5200 -117.6400      18.9        48       181        94
VIS    2025250     91400   15.5300 -117.6400      19.5        46       181        99
VIS    2025250     91400   15.5400 -117.7300      13.4        26       168        98
VIS    2025250     91400   15.5400 -117.7700      12.9        33       167       100
VIS    2025250     91400   15.5300 -117.7800      13.0        34       169       100
VIS    2025250     91400   15.5200 -117.8000      14.6        39       172        97
VIS    2025250     91400   15.5400 -117.8400      17.2        40       172        99
VIS    2025250     91400   15.5100 -118.3700      16.4        28       178        98
VIS    2025250     91400   15.5200 -118.3900      16.5        26       178        96
VIS    2025250     91400   15.5300 -118.5500      21.2        40       165        90
VIS    2025250     91400   15.5100 -118.6000      18.6        46       162        98
VIS    2025250     91400   15.5100 -118.6200      17.6        35       162        98
VIS    2025250     91400   15.5100 -118.6400      17.3        34       164        99
VIS    2025250     91400   15.5000 -119.6500      28.4        40       124        93
VIS    2025250     91400   15.5000 -119.6500      28.3        40       124        93
VIS    2025250     91400   15.6900 -110.3900       7.0        25       191        98
VIS    2025250     91400   15.6800 -110.7800       4.8        45       189        98
VIS    2025250     91400   15.6600 -111.0500       7.4        27       190        97
VIS    2025250     91400   15.6300 -112.2600      20.7        42       185        99
VIS    2025250     91400   15.6500 -112.2900      21.2        40       184        97
VIS    2025250     91400   15.6200 -112.5800      16.2        37       184        90
VIS    2025250     91400   15.6300 -112.7000      20.8        37       188        92
VIS    2025250     91400   15.6300 -112.7300      21.5        38       189        98
VIS    2025250     91400   15.6300 -112.7600      22.0        39       191        99
VIS    2025250     91400   15.6100 -113.2100       4.5        55       178       100
VIS    2025250     91400   15.6100 -113.3800      12.3        34       180        94
VIS    2025250     91400   15.6100 -113.4300       8.7        62       177        95
VIS    2025250     91400   15.6100 -113.4600       8.9        59       177        90
VIS    2025250     91400   15.6000 -113.5400       4.0        74       189        98
VIS    2025250     91400   15.6000 -114.0200       5.3       231       187        99
VIS    2025250     91400   15.5900 -114.0400       6.0       229       188       100
VIS    2025250     91400   15.5800 -114.0800       5.5       229       188        92
VIS    2025250     91400   15.5800 -114.2200       4.4       268       188        95
VIS    2025250     91400   15.5800 -114.2300       4.2       255       189       100
VIS    2025250     91400   15.5700 -115.1700      21.3        25       166        93
VIS    2025250     91400   15.5600 -115.7000      17.5        50       176        90
VIS    2025250     91400   15.5500 -115.7900      17.0        26       171       100
VIS    2025250     91400   15.5000 -117.5600      12.1        30       185        94
VIS    2025250     91400   15.5000 -117.5700      12.7        28       183       100
VIS    2025250     91400   15.5200 -117.6000      20.4        44       182       100
VIS    2025250     91400   15.5200 -117.6300      20.5        45       182        99
VIS    2025250     91400   15.5000 -117.7200      16.0        39       168        98
VIS    2025250     91400   15.5100 -117.7300      14.7        38       168       100
VIS    2025250     91400   15.5100 -117.7500      14.0        36       169       100
VIS    2025250     91400   15.5200 -117.8000      14.4        39       172        98
VIS    2025250     91400   15.5200 -117.8100      14.7        40       172        98
VIS    2025250     91400   15.5100 -117.9200      21.3        36       172        95
VIS    2025250     91400   15.5000 -118.6200      19.4        31       162        95
VIS    2025250     91400   15.4600 -119.4200      20.9        34       155        97
VIS    2025250     91400   15.4600 -119.4200      20.8        34       155        97
VIS    2025250     91400   15.6500 -111.0200       8.4        32       191        99
VIS    2025250     91400   15.6000 -112.6000      16.1        38       183        98
VIS    2025250     91400   15.6000 -112.6200      16.1        38       183        98
VIS    2025250     91400   15.5900 -112.6700      14.9        46       189       100
VIS    2025250     91400   15.6000 -112.6800      14.7        45       191        99
VIS    2025250     91400   15.5800 -113.1900       5.9        60       181        92
VIS    2025250     91400   15.5800 -113.1900       5.4        63       181        90
VIS    2025250     91400   15.5600 -114.0300       4.7       217       185       100
VIS    2025250     91400   15.5700 -114.0400       5.0       221       187        99
VIS    2025250     91400   15.5700 -114.0700       5.0       227       188        96
VIS    2025250     91400   15.5700 -114.2300       4.4       257       190       100
VIS    2025250     91400   15.5700 -114.2300       4.3       257       190        99
VIS    2025250     91400   15.5400 -115.2300      16.4        29       160        95
VIS    2025250     91400   15.5300 -115.2700      15.6        41       158       100
VIS    2025250     91400   15.5400 -115.6200      23.6        40       166        94
VIS    2025250     91400   15.5400 -115.6900      17.2        46       175        93
VIS    2025250     91400   15.5200 -115.7200      17.0        45       176        94
VIS    2025250     91400   15.5000 -117.5700      12.8        28       183        99
VIS    2025250     91400   15.4800 -117.7000      16.4        41       168        99
VIS    2025250     91400   15.4900 -117.7000      16.9        41       168        99
VIS    2025250     91400   15.4700 -117.7300      15.6        42       170       100
VIS    2025250     91400   15.4800 -117.7600      14.5        37       171        99
VIS    2025250     91400   15.4900 -117.8800      12.2        28       177       100
VIS    2025250     91400   15.4600 -118.5800      18.8        35       168        99
VIS    2025250     91400   15.4500 -119.3900      20.8        36       159        99
VIS    2025250     91400   15.4500 -119.4000      20.4        34       159        99
VIS    2025250     91400   15.4500 -119.4300      20.9        34       154        94
VIS    2025250     91400   15.4400 -119.5300      20.9        36       137        93
VIS    2025250     91400   15.4400 -119.5800      22.9        49       135        96
VIS    2025250     91400   15.6200 -111.0200       8.8        32       191        96
VIS    2025250     91400   15.6300 -111.0300       8.8        29       190        92
VIS    2025250     91400   15.5700 -113.1900       5.9        60       181        98
VIS    2025250     91400   15.5500 -113.3200      11.1        34       185        91
VIS    2025250     91400   15.5600 -113.4100       6.0        74       186        99
VIS    2025250     91400   15.5500 -113.9400       4.8       219       181        93
VIS    2025250     91400   15.5400 -113.9700       4.8       216       183        90
VIS    2025250     91400   15.5500 -114.0000       5.2       219       182        94
VIS    2025250     91400   15.5500 -114.0300       4.8       216       185       100
VIS    2025250     91400   15.5500 -114.0500       4.7       218       185        99
VIS    2025250     91400   15.5400 -114.2500       5.0       229       190        93
VIS    2025250     91400   15.5200 -115.2300      16.2        29       160        95
VIS    2025250     91400   15.4500 -117.6200      18.0        40       169       100
VIS    2025250     91400   15.4500 -117.6600      17.2        48       170       100
VIS    2025250     91400   15.4700 -117.7000      15.3        43       169       100
VIS    2025250     91400   15.4600 -117.7200      16.0        43       173        99
VIS    2025250     91400   15.4600 -117.7300      15.6        42       171       100
VIS    2025250     91400   15.4700 -117.7600      14.4        37       171        99
VIS    2025250     91400   15.4300 -119.6000      24.3        51       135        97
VIS    2025250     91400   15.4300 -119.6300      24.0        50       135        94
VIS    2025250     91400   15.5400 -112.6500      20.0        46       190       100
VIS    2025250     91400   15.5500 -112.6600      20.3        45       187       100
VIS    2025250     91400   15.5300 -113.1700       6.1        39       184        93
VIS    2025250     91400   15.5300 -113.2900      11.5        33       185        98
VIS    2025250     91400   15.5300 -113.3100      12.1        32       185        96
VIS    2025250     91400   15.5400 -113.3800       5.8        58       184        96
VIS    2025250     91400   15.5200 -113.9800       5.1       213       184        97
VIS    2025250     91400   15.5200 -114.0000       5.4       216       184        97
VIS    2025250     91400   15.5100 -114.0300       5.7       216       184        97
VIS    2025250     91400   15.5300 -114.0500       4.5       218       185        93
VIS    2025250     91400   15.4300 -117.6000      16.9        40       167       100
VIS    2025250     91400   15.4400 -117.6100      17.7        40       169       100
VIS    2025250     91400   15.4300 -117.6500      17.0        44       172        99
VIS    2025250     91400   15.4300 -117.6600      16.9        46       172       100
VIS    2025250     91400   15.4300 -117.6800      16.7        45       173       100
VIS    2025250     91400   15.4400 -117.7100      15.5        44       172       100
VIS    2025250     91400   15.4300 -117.7600      14.5        41       174        94
VIS    2025250     91400   15.4400 -117.7700      14.5        39       175        95
VIS    2025250     91400   15.4400 -117.8100      19.2        47       178        98
VIS    2025250     91400   15.4400 -117.8200      19.1        47       178        99
VIS    2025250     91400   15.4200 -118.4300      11.2        30       176        97
VIS    2025250     91400   15.4200 -118.5000      23.0        42       176        91
VIS    2025250     91400   15.4200 -118.5100      23.1        42       176        90
VIS    2025250     91400   15.3900 -119.3400      22.4        34       168       100
VIS    2025250     91400   15.3900 -119.5800      24.6        55       145       100
VIS    2025250     91400   15.4000 -119.6000      24.3        52       135        96
VIS    2025250     91400   15.4100 -119.6300      24.1        50       136        96
VIS    2025250     91400   15.5200 -112.6300      20.2        46       187        97
VIS    2025250     91400   15.5100 -113.1600       5.2        39       183        95
VIS    2025250     91400   15.5100 -113.5700       4.0        84       188        95
VIS    2025250     91400   15.4900 -113.9800       4.4       219       184        96
VIS    2025250     91400   15.5000 -114.0100       6.1       218       185        99
VIS    2025250     91400   15.4900 -114.0300       4.5       229       188       100
VIS    2025250     91400   15.4500 -115.5100      20.6        68       167        98
VIS    2025250     91400   15.4500 -115.5500      19.0        67       168       100
VIS    2025250     91400   15.4500 -115.5900      16.9        62       169        98
VIS    2025250     91400   15.4500 -115.6400      13.2        51       164       100
VIS    2025250     91400   15.4100 -117.3700      14.9        26       176        97
VIS    2025250     91400   15.4000 -117.5800      17.9        41       162        99
VIS    2025250     91400   15.4100 -117.5800      17.9        41       167        98
VIS    2025250     91400   15.4200 -117.6100      17.9        41       167       100
VIS    2025250     91400   15.4000 -117.6400      17.3        44       172        96
VIS    2025250     91400   15.4200 -117.6800      16.8        44       174       100
VIS    2025250     91400   15.4000 -117.6900      16.8        42       176       100
VIS    2025250     91400   15.4100 -117.7100      16.0        41       176        98
VIS    2025250     91400   15.4100 -117.7900      19.8        48       178        94
VIS    2025250     91400   15.4100 -117.8000      19.3        42       178        98
VIS    2025250     91400   15.3900 -118.5000      20.6        44       172        95
VIS    2025250     91400   15.3900 -118.5200      20.8        43       172        90
VIS    2025250     91400   15.3800 -119.5900      24.7        55       145       100
VIS    2025250     91400   15.3800 -119.6100      24.8        55       145       100
VIS    2025250     91400   15.3800 -119.6300      24.7        54       145       100
VIS    2025250     91400   15.3700 -119.6900      22.0        44       153        92
VIS    2025250     91400   15.3700 -119.7100      22.0        43       153        92
VIS    2025250     91400   15.5500 -110.6200      10.4        47       191       100
VIS    2025250     91400   15.5100 -112.5700      15.4        41       184        99
VIS    2025250     91400   15.5100 -112.6300      20.1        46       187        97
VIS    2025250     91400   15.4800 -113.9800       4.3       222       184        96
VIS    2025250     91400   15.4300 -115.4900      21.0        67       167        98
VIS    2025250     91400   15.4300 -115.5100      20.5        68       167        99
VIS    2025250     91400   15.4300 -115.5200      20.7        68       167        99
VIS    2025250     91400   15.4400 -115.5500      18.5        67       169        99
VIS    2025250     91400   15.4400 -115.5800      18.0        67       169        97
VIS    2025250     91400   15.4400 -115.6300      13.1        57       164        97
VIS    2025250     91400   15.4000 -117.4100      15.5        27       178        92
VIS    2025250     91400   15.3800 -117.4400      21.3        53       168        98
VIS    2025250     91400   15.3800 -117.4600      21.1        53       168        99
VIS    2025250     91400   15.3800 -117.4800      20.6        51       168       100
VIS    2025250     91400   15.3900 -117.5800      17.4        42       166        99
VIS    2025250     91400   15.3900 -117.5900      17.9        43       162        99
VIS    2025250     91400   15.3900 -117.6200      17.8        45       168        97
VIS    2025250     91400   15.4000 -117.6400      17.5        44       172        96
VIS    2025250     91400   15.3800 -117.6800      16.8        41       177       100
VIS    2025250     91400   15.4000 -117.6900      16.6        41       176       100
VIS    2025250     91400   15.3700 -118.3900      23.6         6       179        95
VIS    2025250     91400   15.3700 -118.4500      13.3        35       175        99
VIS    2025250     91400   15.3500 -119.2700      19.5        39       169       100
VIS    2025250     91400   15.3600 -119.3100      20.3        38       162        95
VIS    2025250     91400   15.3500 -119.4100      21.8        43       153        98
VIS    2025250     91400   15.3400 -119.4400      21.3        43       152        92
VIS    2025250     91400   15.3600 -119.6600      21.1        46       154        91
VIS    2025250     91400   15.3600 -119.6800      21.2        45       156        99
VIS    2025250     91400   15.3600 -119.7000      20.8        44       156        97
VIS    2025250     91400   15.5400 -110.6200      10.8        48       191       100
VIS    2025250     91400   15.5400 -110.6400      10.0        44       190        98
VIS    2025250     91400   15.5400 -110.8700       9.2        49       184        98
VIS    2025250     91400   15.5300 -110.8900       9.2        50       184        98
VIS    2025250     91400   15.5200 -110.9000       9.2        46       184        98
VIS    2025250     91400   15.4800 -112.4900      17.5        32       186        96
VIS    2025250     91400   15.4800 -112.5000      17.6        32       186        96
VIS    2025250     91400   15.4600 -113.0700       8.4        65       186        94
VIS    2025250     91400   15.4700 -113.1200       6.3        72       186        90
VIS    2025250     91400   15.4700 -113.1200       6.3        71       186        96
VIS    2025250     91400   15.4500 -113.4800       4.2       248       189        98
VIS    2025250     91400   15.4600 -113.5000       4.4       242       190        99
VIS    2025250     91400   15.4500 -113.5200       4.6       236       190        93
VIS    2025250     91400   15.4600 -113.9800       4.1       224       181        98
VIS    2025250     91400   15.4100 -115.0900      24.0         9       170        92
VIS    2025250     91400   15.4200 -115.4900      20.5        66       167        98
VIS    2025250     91400   15.4100 -115.5100      20.0        66       167       100
VIS    2025250     91400   15.4000 -115.5400      19.9        66       169       100
VIS    2025250     91400   15.4200 -115.5600      18.0        68       169        99
VIS    2025250     91400   15.4000 -115.6000      18.0        63       169       100
VIS    2025250     91400   15.4000 -115.6200      17.6        62       168        98
VIS    2025250     91400   15.4100 -115.6600      15.9        53       166        90
VIS    2025250     91400   15.4000 -115.7000      15.5        44       164        95
VIS    2025250     91400   15.4100 -115.7400      11.7        32       158        98
VIS    2025250     91400   15.4100 -115.8000      16.5        45       164        91
VIS    2025250     91400   15.3600 -117.3400      21.3        58       156        96
VIS    2025250     91400   15.3800 -117.3400      21.8        58       158        91
VIS    2025250     91400   15.3600 -117.3900      19.4        50       165       100
VIS    2025250     91400   15.3600 -117.4000      19.4        49       166       100
VIS    2025250     91400   15.3600 -117.4500      21.0        53       153       100
VIS    2025250     91400   15.3600 -117.4600      20.9        53       152       100
VIS    2025250     91400   15.3700 -117.5000      19.8        51       163       100
VIS    2025250     91400   15.3700 -117.5200      18.3        48       166        98
VIS    2025250     91400   15.3600 -117.5400      17.4        43       166       100
VIS    2025250     91400   15.3700 -117.5800      16.6        43       167       100
VIS    2025250     91400   15.3700 -117.6000      17.8        44       167        99
VIS    2025250     91400   15.3700 -117.6100      17.8        45       168        97
VIS    2025250     91400   15.3700 -117.6400      18.0        43       174        96
VIS    2025250     91400   15.3700 -117.6800      16.9        41       177       100
VIS    2025250     91400   15.3700 -117.6900      16.6        40       177       100
VIS    2025250     91400   15.3500 -118.3300      24.6        23       179       100
VIS    2025250     91400   15.3600 -118.3800      22.4        12       179        97
VIS    2025250     91400   15.3500 -118.4000      23.1         8       176        97
VIS    2025250     91400   15.3500 -118.4200      22.3         9       177        99
VIS    2025250     91400   15.3400 -119.2600      20.8        35       170        95
VIS    2025250     91400   15.3300 -119.3000      20.1        41       162        99
VIS    2025250     91400   15.3300 -119.3200      20.3        41       159        99
VIS    2025250     91400   15.3200 -119.4100      21.6        45       152       100
VIS    2025250     91400   15.3300 -119.4300      21.4        46       150        98
VIS    2025250     91400   15.3100 -119.6100      24.3        41       157       100
VIS    2025250     91400   15.3100 -119.6700      21.4        45       158        92
VIS    2025250     91400   15.3200 -119.6800      22.1        47       158        99
VIS    2025250     91400   15.3200 -119.7100      21.8        49       158       100
VIS    2025250     91400   15.5100 -110.6700       6.9        30       191       100
VIS    2025250     91400   15.5100 -110.6700       7.2        29       191       100
VIS    2025250     91400   15.4700 -111.6300      13.7        52       190        98
VIS    2025250     91400   15.4500 -112.4300       5.2        42       176       100
VIS    2025250     91400   15.4600 -112.4800      18.3        32       186       100
VIS    2025250     91400   15.4700 -112.5000      18.2        32       186        99
VIS    2025250     91400   15.4400 -113.1000       8.6        61       182       100
VIS    2025250     91400   15.4200 -114.1500      10.7       238       187       100
VIS    2025250     91400   15.3900 -115.0800      24.2        10       171        93
VIS    2025250     91400   15.4100 -115.0900      24.0         9       170        92
VIS    2025250     91400   15.3900 -115.1300      22.8        38       168       100
VIS    2025250     91400   15.3900 -115.5200      20.1        66       170       100
VIS    2025250     91400   15.3800 -115.5300      19.1        55       168        93
VIS    2025250     91400   15.3800 -115.5600      18.6        64       169       100
VIS    2025250     91400   15.3800 -115.5900      18.1        61       167        97
VIS    2025250     91400   15.3900 -115.6300      17.4        61       167        99
VIS    2025250     91400   15.3700 -115.6500      17.0        61       168        98
VIS    2025250     91400   15.3900 -115.6900      16.6        59       163        97
VIS    2025250     91400   15.3800 -115.6900      16.1        42       164        94
VIS    2025250     91400   15.3800 -115.7300      17.5        44       169        91
VIS    2025250     91400   15.3600 -117.3400      21.2        58       154        97
VIS    2025250     91400   15.3500 -117.3500      20.8        57       154        98
VIS    2025250     91400   15.3400 -117.3900      20.1        55       151        97
VIS    2025250     91400   15.3500 -117.4100      20.0        49       164       100
VIS    2025250     91400   15.3500 -117.4500      21.0        53       152       100
VIS    2025250     91400   15.3400 -117.4800      20.4        54       152       100
VIS    2025250     91400   15.3400 -117.4900      20.0        54       152       100
VIS    2025250     91400   15.3300 -117.5100      19.2        52       156       100
VIS    2025250     91400   15.3300 -117.5400      18.7        47       158       100
VIS    2025250     91400   15.3300 -117.5800      18.1        44       165       100
VIS    2025250     91400   15.3400 -117.6000      17.5        43       168        99
VIS    2025250     91400   15.3400 -117.6300      17.5        42       174        97
VIS    2025250     91400   15.3300 -117.6600      15.6        38       174        99
VIS    2025250     91400   15.3300 -117.6700      16.4        39       174        99
VIS    2025250     91400   15.3500 -117.7000      16.2        39       176        95
VIS    2025250     91400   15.3200 -118.4400      22.3        12       175        97
VIS    2025250     91400   15.3000 -119.2400      20.6        43       170        99
VIS    2025250     91400   15.3000 -119.2700      19.8        39       168        99
VIS    2025250     91400   15.3200 -119.3000      21.5        36       163        94
VIS    2025250     91400   15.3000 -119.3300      20.7        44       159       100
VIS    2025250     91400   15.3000 -119.3500      20.9        44       157       100
VIS    2025250     91400   15.3000 -119.3700      21.1        44       155       100
VIS    2025250     91400   15.2900 -119.4100      21.3        46       152       100
VIS    2025250     91400   15.3000 -119.4200      21.5        46       152       100
VIS    2025250     91400   15.3000 -119.4700      22.2        37       153        95
VIS    2025250     91400   15.3000 -119.6300      24.2        41       157       100
VIS    2025250     91400   15.3100 -119.6700      22.9        49       158        97
VIS    2025250     91400   15.2900 -119.7000      22.4        50       160       100
VIS    2025250     91400   15.2900 -119.7200      22.2        50       160       100
VIS    2025250     91400   15.4700 -110.6400       4.8        29       189       100
VIS    2025250     91400   15.4700 -111.6300      13.6        53       190        99
VIS    2025250     91400   15.4600 -111.6400      13.5        56       187        99
VIS    2025250     91400   15.4400 -112.4000       5.2        39       184       100
VIS    2025250     91400   15.4300 -112.4200       5.5        38       184        99
VIS    2025250     91400   15.4100 -113.0700       8.8        65       180       100
VIS    2025250     91400   15.4300 -113.1000       8.7        61       182        99
VIS    2025250     91400   15.4100 -113.1100       9.0        57       182       100
VIS    2025250     91400   15.4200 -113.2300       8.7        70       185        94
VIS    2025250     91400   15.4100 -113.2600       8.6        64       186       100
VIS    2025250     91400   15.3600 -115.1200      19.8        45       171        99
VIS    2025250     91400   15.3800 -115.1400      22.8        38       168        99
VIS    2025250     91400   15.3600 -115.5300      19.0        50       166       100
VIS    2025250     91400   15.3700 -115.5400      19.0        59       168       100
VIS    2025250     91400   15.3700 -115.5700      18.7        56       168        99
VIS    2025250     91400   15.3600 -115.6100      18.2        58       164        97
VIS    2025250     91400   15.3600 -115.6200      17.5        60       166        98
VIS    2025250     91400   15.3600 -115.6600      16.8        59       167        95
VIS    2025250     91400   15.3500 -115.6700      16.6        57       167        94
VIS    2025250     91400   15.3200 -117.3000      20.0        59       155        98
VIS    2025250     91400   15.3200 -117.3500      20.2        54       144       100
VIS    2025250     91400   15.3200 -117.3600      20.2        54       144        99
VIS    2025250     91400   15.3200 -117.4000      20.3        54       143        97
VIS    2025250     91400   15.3200 -117.4200      20.6        53       143        99
VIS    2025250     91400   15.3300 -117.4500      20.7        53       147       100
VIS    2025250     91400   15.3300 -117.4700      20.3        54       147       100
VIS    2025250     91400   15.3200 -117.4900      19.9        54       147       100
VIS    2025250     91400   15.3100 -117.5200      19.0        49       156       100
VIS    2025250     91400   15.3300 -117.5400      18.7        47       158       100
VIS    2025250     91400   15.3200 -117.5700      18.5        44       161       100
VIS    2025250     91400   15.3100 -117.6200      17.5        40       172        98
VIS    2025250     91400   15.3200 -117.6200      17.3        41       173        97
VIS    2025250     91400   15.3200 -117.6600      16.3        38       174        98
VIS    2025250     91400   15.3200 -117.6900      15.4        36       174        99
VIS    2025250     91400   15.3100 -117.7200      15.4        35       177        93
VIS    2025250     91400   15.3100 -117.7700      17.9        43       178       100
VIS    2025250     91400   15.3100 -118.3300      10.3        44       177        99
VIS    2025250     91400   15.2900 -118.5200      22.1         5       172        94
VIS    2025250     91400   15.3100 -118.5200      23.5         4       176        99
VIS    2025250     91400   15.2700 -119.2400      21.7        42       168       100
VIS    2025250     91400   15.2800 -119.2900      19.6        39       162        99
VIS    2025250     91400   15.2700 -119.3300      20.1        43       161       100
VIS    2025250     91400   15.2900 -119.3500      20.9        44       157       100
VIS    2025250     91400   15.2700 -119.3800      20.9        43       156       100
VIS    2025250     91400   15.2700 -119.4000      21.0        43       156       100
VIS    2025250     91400   15.2800 -119.4400      21.2        44       152        99
VIS    2025250     91400   15.2700 -119.4700      22.3        37       156        95
VIS    2025250     91400   15.2800 -119.4900      22.3        38       157        92
VIS    2025250     91400   15.2900 -119.5000      22.4        38       157        97
VIS    2025250     91400   15.2700 -119.6300      24.1        39       157       100
VIS    2025250     91400   15.2900 -119.6300      24.2        39       157       100
VIS    2025250     91400   15.2700 -119.6700      24.3        38       157       100
VIS    2025250     91400   15.2800 -119.7100      22.3        50       160       100
VIS    2025250     91400   15.4700 -110.6400       4.8        31       189       100
VIS    2025250     91400   15.4500 -110.6500       5.8        35       187       100
VIS    2025250     91400   15.4400 -111.4000       9.0        41       190       100
VIS    2025250     91400   15.4200 -111.7300       5.3        52       189        97
VIS    2025250     91400   15.4200 -112.4200       5.5        37       184        99
VIS    2025250     91400   15.4200 -112.4200       5.5        37       184        99
VIS    2025250     91400   15.4000 -113.0500       9.0        65       181        93
VIS    2025250     91400   15.3900 -113.0900       9.9        53       181        96
VIS    2025250     91400   15.3800 -113.1300       9.4        48       188       100
VIS    2025250     91400   15.4000 -113.2500       8.7        65       185        94
VIS    2025250     91400   15.3800 -113.4200      20.2        27       186       100
VIS    2025250     91400   15.3800 -113.8500       4.7       223       177       100
VIS    2025250     91400   15.3800 -113.8700       4.8       222       179       100
VIS    2025250     91400   15.3700 -114.0200       4.0       268       184        95
VIS    2025250     91400   15.3600 -114.1500      11.8       214       190       100
VIS    2025250     91400   15.3600 -115.1300      19.8        45       172        98
VIS    2025250     91400   15.3400 -115.5100      19.1        49       164       100
VIS    2025250     91400   15.3500 -115.5400      19.0        50       166       100
VIS    2025250     91400   15.3400 -115.5700      19.4        52       166       100
VIS    2025250     91400   15.3400 -115.6000      18.5        56       164        93
VIS    2025250     91400   15.3300 -115.6300      18.0        56       164        93
VIS    2025250     91400   15.3400 -115.6500      17.0        58       166       100
VIS    2025250     91400   15.2900 -117.3200      20.6        53       155        97
VIS    2025250     91400   15.3000 -117.3500      20.2        52       146        98
VIS    2025250     91400   15.3100 -117.3500      20.1        52       144        98
VIS    2025250     91400   15.3100 -117.4000      20.3        52       142        93
VIS    2025250     91400   15.3000 -117.4100      20.4        52       143        96
VIS    2025250     91400   15.3000 -117.4400      20.3        48       143        91
VIS    2025250     91400   15.2900 -117.4800      18.9        46       152       100
VIS    2025250     91400   15.2900 -117.4900      18.9        46       152       100
VIS    2025250     91400   15.2900 -117.5200      18.7        47       153       100
VIS    2025250     91400   15.3000 -117.5500      18.2        45       159       100
VIS    2025250     91400   15.3000 -117.5700      18.2        44       159       100
VIS    2025250     91400   15.3000 -117.6200      17.6        39       172        99
VIS    2025250     91400   15.3000 -117.6200      17.2        39       172        98
VIS    2025250     91400   15.3000 -117.6700      16.2        36       175       100
VIS    2025250     91400   15.3000 -117.6800      16.2        36       175       100
VIS    2025250     91400   15.3000 -117.7700      18.2        43       177       100
VIS    2025250     91400   15.2700 -118.3100      10.0        48       174       100
VIS    2025250     91400   15.2700 -118.3300      10.0        48       174       100
VIS    2025250     91400   15.2800 -118.5200      23.8         6       170        93
VIS    2025250     91400   15.2500 -119.2400      21.7        39       167       100
VIS    2025250     91400   15.2600 -119.2600      21.3        40       167        99
VIS    2025250     91400   15.2600 -119.2700      22.1        41       167        92
VIS    2025250     91400   15.2600 -119.3000      19.2        40       162        99
VIS    2025250     91400   15.2700 -119.3300      21.3        40       161        90
VIS    2025250     91400   15.2700 -119.3500      20.3        43       159       100
VIS    2025250     91400   15.2600 -119.3900      20.9        42       159       100
VIS    2025250     91400   15.2700 -119.4000      20.9        42       156       100
VIS    2025250     91400   15.2500 -119.4200      21.1        38       162       100
VIS    2025250     91400   15.2400 -119.4700      21.5        36       163        96
VIS    2025250     91400   15.2600 -119.4700      22.2        37       157        94
VIS    2025250     91400   15.2600 -119.6500      24.2        37       157       100
VIS    2025250     91400   15.4300 -110.6300       6.6        40       187       100
VIS    2025250     91400   15.4400 -110.7000       8.3        51       188        99
VIS    2025250     91400   15.4200 -110.7200       8.7        52       188       100
VIS    2025250     91400   15.4100 -111.4100       9.8        42       191        91
VIS    2025250     91400   15.3800 -112.3700       7.0        24       187        97
VIS    2025250     91400   15.3800 -112.3700       7.2        24       187        98
VIS    2025250     91400   15.3600 -113.0800       9.2        53       181        98
VIS    2025250     91400   15.3700 -113.0900      10.1        52       181        96
VIS    2025250     91400   15.3800 -113.1500       5.5        56       188        99
VIS    2025250     91400   15.3600 -113.1800       6.4        64       188       100
VIS    2025250     91400   15.3600 -113.8600       4.7       223       177       100
VIS    2025250     91400   15.3500 -114.1500      11.8       214       190       100
VIS    2025250     91400   15.3500 -114.1600      11.9       213       190       100
VIS    2025250     91400   15.3200 -115.0600      17.5        44       178        96
VIS    2025250     91400   15.3100 -115.5300      19.7        45       163       100
VIS    2025250     91400   15.3200 -115.5600      20.9        49       163        93
VIS    2025250     91400   15.3100 -115.6200      19.0        56       166        96
VIS    2025250     91400   15.3000 -115.6400      18.7        57       166       100
VIS    2025250     91400   15.3100 -115.6700      18.2        52       172        99
VIS    2025250     91400   15.2800 -117.2700      19.3        46       174        99
VIS    2025250     91400   15.2700 -117.2800      19.3        50       170        99
VIS    2025250     91400   15.2600 -117.3200      21.1        50       160        99
VIS    2025250     91400   15.2700 -117.3500      20.1        48       156        99
VIS    2025250     91400   15.2700 -117.3600      20.1        48       153        99
VIS    2025250     91400   15.2600 -117.4400      19.1        44       154       100
VIS    2025250     91400   15.2800 -117.4900      19.0        44       152       100
VIS    2025250     91400   15.2700 -117.5100      18.8        45       155       100
VIS    2025250     91400   15.2700 -117.5200      18.7        45       157       100
VIS    2025250     91400   15.2700 -117.5500      18.5        44       159       100
VIS    2025250     91400   15.2700 -117.5700      18.9        40       168       100
VIS    2025250     91400   15.2700 -117.6200      18.8        40       172       100
VIS    2025250     91400   15.2700 -117.6300      18.4        38       172       100
VIS    2025250     91400   15.2500 -118.3100       9.9        48       174        99
VIS    2025250     91400   15.2500 -118.3500       9.9        49       174        99
VIS    2025250     91400   15.2400 -118.3900      19.7        21       166        91
VIS    2025250     91400   15.2400 -118.4200      21.5        15       169        98
VIS    2025250     91400   15.2400 -118.4300      21.7        15       169        97
VIS    2025250     91400   15.2500 -118.4500      22.2        12       169        97
VIS    2025250     91400   15.2500 -118.5100      19.4        17       171        96
VIS    2025250     91400   15.2400 -118.5400      19.4        18       173        94
VIS    2025250     91400   15.2500 -119.2000      22.0        32       173        92
VIS    2025250     91400   15.2400 -119.2200      22.2        32       172        91
VIS    2025250     91400   15.2300 -119.2600      22.6        40       167       100
VIS    2025250     91400   15.2200 -119.2800      22.6        40       168       100
VIS    2025250     91400   15.2300 -119.3000      23.0        39       168        96
VIS    2025250     91400   15.2300 -119.3400      19.7        41       166        99
VIS    2025250     91400   15.2400 -119.3500      21.0        37       165        97
VIS    2025250     91400   15.2300 -119.3900      20.7        39       166       100
VIS    2025250     91400   15.2300 -119.4000      20.8        39       166       100
VIS    2025250     91400   15.2400 -119.4300      21.3        37       163       100
VIS    2025250     91400   15.2400 -119.4600      21.4        35       163        98
VIS    2025250     91400   15.2300 -119.5000      20.6        35       168        97
VIS    2025250     91400   15.2300 -119.5000      20.6        35       168        97
VIS    2025250     91400   15.4100 -110.6300       7.0        40       189        99
VIS    2025250     91400   15.4100 -110.6700       8.6        44       187        91
VIS    2025250     91400   15.4100 -110.6900       8.5        49       188        92
VIS    2025250     91400   15.4100 -110.7400       8.0        48       189        98
VIS    2025250     91400   15.4000 -110.7600       7.4        47       190        99
VIS    2025250     91400   15.3700 -111.5800       7.2        24       188        95
VIS    2025250     91400   15.3500 -112.3800       7.1        28       187        97
VIS    2025250     91400   15.3600 -113.1100       9.4        50       186        98
VIS    2025250     91400   15.3400 -113.1800       7.2        66       188        98
VIS    2025250     91400   15.3200 -113.9800       4.1       268       185       100
VIS    2025250     91400   15.3100 -114.0700       4.5       321       185        96
VIS    2025250     91400   15.3100 -114.0900       4.6       331       185        98
VIS    2025250     91400   15.3200 -114.1500       5.4       215       189        92
VIS    2025250     91400   15.3300 -114.1600       5.5       215       189        92
VIS    2025250     91400   15.3000 -115.0500      18.0        46       179        95
VIS    2025250     91400   15.3000 -115.2700      19.7         7       166        96
VIS    2025250     91400   15.3000 -115.6200      17.5        56       166        97
VIS    2025250     91400   15.2800 -115.6400      18.3        53       166        99
VIS    2025250     91400   15.2800 -115.6800      18.5        52       172       100
VIS    2025250     91400   15.2900 -115.7000      17.5        52       170       100
VIS    2025250     91400   15.2900 -115.7100      17.2        51       168       100
VIS    2025250     91400   15.2500 -117.2800      19.9        50       168       100
VIS    2025250     91400   15.2400 -117.2800      19.9        50       167       100
VIS    2025250     91400   15.2600 -117.3300      20.8        49       160       100
VIS    2025250     91400   15.2500 -117.3400      20.3        46       162       100
VIS    2025250     91400   15.2400 -117.3600      19.6        45       162       100
VIS    2025250     91400   15.2500 -117.4100      20.0        50       154        90
VIS    2025250     91400   15.2500 -117.4600      19.1        44       157       100
VIS    2025250     91400   15.2400 -117.4700      19.1        44       157       100
VIS    2025250     91400   15.2600 -117.5200      19.0        43       159       100
VIS    2025250     91400   15.2600 -117.5200      18.9        42       161       100
VIS    2025250     91400   15.2400 -117.5700      18.9        39       168       100
VIS    2025250     91400   15.2300 -117.5800      18.9        39       174       100
VIS    2025250     91400   15.2400 -117.6000      18.9        37       175       100
VIS    2025250     91400   15.2200 -118.4100      20.8        18       167        97
VIS    2025250     91400   15.2000 -119.1600      22.3        38       175        99
VIS    2025250     91400   15.2100 -119.1700      22.0        37       174       100
VIS    2025250     91400   15.2200 -119.1900      21.3        37       174       100
VIS    2025250     91400   15.2200 -119.2300      21.9        31       172        91
VIS    2025250     91400   15.2200 -119.2600      23.5        35       168        94
VIS    2025250     91400   15.2100 -119.2900      23.1        40       168        97
VIS    2025250     91400   15.2200 -119.3000      24.1        36       168        92
VIS    2025250     91400   15.2100 -119.3200      21.0        39       169       100
VIS    2025250     91400   15.2100 -119.3700      20.3        39       169       100
VIS    2025250     91400   15.2100 -119.3800      20.4        39       169       100
VIS    2025250     91400   15.2000 -119.4000      20.3        38       171       100
VIS    2025250     91400   15.2000 -119.4400      20.4        36       170        99
VIS    2025250     91400   15.2000 -119.4700      20.6        36       170        98
VIS    2025250     91400   15.2000 -119.5000      19.7        38       172        99
VIS    2025250     91400   15.2000 -119.5100      19.3        37       174        99
VIS    2025250     91400   15.2000 -119.5500      16.2        37       175        95
VIS    2025250     91400   15.3900 -110.6400       4.4        63       190        96
VIS    2025250     91400   15.3800 -110.6800       8.5        50       189        99
VIS    2025250     91400   15.3800 -110.7500       7.0        46       188        97
VIS    2025250     91400   15.3900 -110.7600       7.1        47       189        99
VIS    2025250     91400   15.3900 -110.7800       6.6        48       190        95
VIS    2025250     91400   15.3600 -111.2700       6.8        50       187        92
VIS    2025250     91400   15.3600 -111.2900       6.8        47       187        99
VIS    2025250     91400   15.3600 -111.3800      10.3        51       189        97
VIS    2025250     91400   15.3500 -111.5700       7.3        24       188        99
VIS    2025250     91400   15.3500 -111.5700       7.4        24       188        99
VIS    2025250     91400   15.3500 -111.7000      12.3        34       185        96
VIS    2025250     91400   15.3500 -111.7400      10.8        26       185        97
VIS    2025250     91400   15.3200 -113.0500       9.0        63       184        99
VIS    2025250     91400   15.3100 -113.1600       7.9        62       186        90
VIS    2025250     91400   15.3200 -113.1800       7.7        67       186        94
VIS    2025250     91400   15.3100 -113.7600       9.6        38       173        95
VIS    2025250     91400   15.3100 -113.7700       9.6        39       173        95
VIS    2025250     91400   15.3000 -113.8100      18.5        42       176        90
VIS    2025250     91400   15.3000 -113.8300      19.0        42       176        91
VIS    2025250     91400   15.3000 -114.0700       4.5       323       183        98
VIS    2025250     91400   15.3000 -114.0800       4.6       327       182        99
VIS    2025250     91400   15.2500 -115.6500      18.4        55       162        99
VIS    2025250     91400   15.2600 -115.6700      18.9        54       165        99
VIS    2025250     91400   15.2500 -115.6900      18.5        54       165        98
VIS    2025250     91400   15.2200 -117.2000      22.9        28       166        94
VIS    2025250     91400   15.2300 -117.2700      20.0        51       163       100
VIS    2025250     91400   15.2400 -117.2800      20.9        47       167        90
VIS    2025250     91400   15.2300 -117.3300      20.1        46       169       100
VIS    2025250     91400   15.2300 -117.3600      20.8        40       162        93
VIS    2025250     91400   15.2300 -117.3700      20.5        41       162        94
VIS    2025250     91400   15.2100 -117.4000      19.4        44       166        99
VIS    2025250     91400   15.2300 -117.4400      19.9        38       163        91
VIS    2025250     91400   15.2300 -117.4500      18.5        42       163       100
VIS    2025250     91400   15.2100 -117.5000      19.7        39       170        99
VIS    2025250     91400   15.2300 -117.5000      21.0        37       167        94
VIS    2025250     91400   15.2300 -117.5700      18.8        39       171       100
VIS    2025250     91400   15.2300 -117.5900      20.5        35       174        94
VIS    2025250     91400   15.2300 -117.6100      20.5        34       175        94
VIS    2025250     91400   15.2100 -117.6800      18.1        38       181        97
VIS    2025250     91400   15.2000 -118.4100      21.3        24       165        93
VIS    2025250     91400   15.2000 -118.5100      22.5        12       189        95
VIS    2025250     91400   15.1900 -119.1200      21.7        38       166        95
VIS    2025250     91400   15.1800 -119.1700      22.5        39       165        99
VIS    2025250     91400   15.1900 -119.2100      22.0        36       170       100
VIS    2025250     91400   15.1900 -119.2300      21.9        35       167       100
VIS    2025250     91400   15.2000 -119.2600      22.3        35       169       100
VIS    2025250     91400   15.1800 -119.2900      21.2        38       169        98
VIS    2025250     91400   15.1800 -119.3200      21.3        38       170       100
VIS    2025250     91400   15.1800 -119.3500      20.5        38       171       100
VIS    2025250     91400   15.1800 -119.3800      20.0        38       171       100
VIS    2025250     91400   15.1900 -119.4000      20.1        38       171       100
VIS    2025250     91400   15.1900 -119.4200      20.3        37       171       100
VIS    2025250     91400   15.1900 -119.4500      20.1        36       173        99
VIS    2025250     91400   15.1900 -119.4600      20.2        36       172        99
VIS    2025250     91400   15.1900 -119.5000      21.4        35       172        94
VIS    2025250     91400   15.1800 -119.5200      19.4        39       180        99
VIS    2025250     91400   15.1900 -119.5600      17.0        37       176        99
VIS    2025250     91400   15.1800 -119.5700      17.4        39       177        97
VIS    2025250     91400   15.1700 -119.6200      20.9        30       171        98
VIS    2025250     91400   15.1700 -119.6500      20.0        30       174       100
VIS    2025250     91400   15.1700 -119.7400      20.9        27       179        99
VIS    2025250     91400   15.3600 -110.5500       4.5        37       187       100
VIS    2025250     91400   15.3600 -110.6000       5.4        40       186        93
VIS    2025250     91400   15.3600 -110.6100       5.3        43       186        96
VIS    2025250     91400   15.3600 -110.6900       8.9        47       189        96
VIS    2025250     91400   15.3500 -110.7000       8.0        48       189        97
VIS    2025250     91400   15.3600 -110.7300       7.4        47       190        99
VIS    2025250     91400   15.3600 -110.7600       6.7        47       188        95
VIS    2025250     91400   15.3600 -110.7900       6.5        45       189        98
VIS    2025250     91400   15.3400 -111.2400       7.3        53       191        98
VIS    2025250     91400   15.3400 -111.2800       7.2        43       188        96
VIS    2025250     91400   15.3500 -111.2800       7.0        45       187        96
VIS    2025250     91400   15.3400 -111.3200       7.6        42       185       100
VIS    2025250     91400   15.3400 -111.3500       8.1        47       188        97
VIS    2025250     91400   15.3400 -111.3900      10.0        51       191        94
VIS    2025250     91400   15.3500 -111.5700       7.2        25       188        99
VIS    2025250     91400   15.3500 -111.5800       7.3        25       188       100
VIS    2025250     91400   15.3400 -111.6000       7.2        23       188        99
VIS    2025250     91400   15.3400 -111.6900      12.3        33       185        91
VIS    2025250     91400   15.3300 -111.7200      11.9        31       185       100
VIS    2025250     91400   15.3400 -111.7200      11.7        29       185       100
VIS    2025250     91400   15.3400 -111.7600      11.6        23       185       100
VIS    2025250     91400   15.3400 -111.7900      12.0        22       189       100
VIS    2025250     91400   15.3200 -112.1200      12.7        32       191       100
VIS    2025250     91400   15.3100 -112.1300      12.7        32       191       100
VIS    2025250     91400   15.3200 -112.1600      12.7        32       191       100
VIS    2025250     91400   15.3200 -112.5400      18.4        32       190        97
VIS    2025250     91400   15.3200 -112.5600      18.4        32       190        97
VIS    2025250     91400   15.2900 -113.6700       5.0        49       175        92
VIS    2025250     91400   15.2800 -114.0800       5.1       328       182       100
VIS    2025250     91400   15.2700 -114.1300       4.7       349       179        98
VIS    2025250     91400   15.2300 -115.6000      20.8        46       160        99
VIS    2025250     91400   15.2300 -115.6300      21.0        45       160        98
VIS    2025250     91400   15.2500 -115.6400      19.0        54       162        99
VIS    2025250     91400   15.2400 -115.6900      19.4        54       165        99
VIS    2025250     91400   15.2100 -117.2000      22.5        29       166        91
VIS    2025250     91400   15.1900 -117.2500      20.8        55       164        99
VIS    2025250     91400   15.1900 -117.2800      20.8        53       165        95
VIS    2025250     91400   15.1900 -117.3000      20.6        51       169        96
VIS    2025250     91400   15.1900 -117.3200      20.0        48       172        98
VIS    2025250     91400   15.1900 -117.3600      20.1        42       173        99
VIS    2025250     91400   15.2000 -117.3700      19.9        42       169       100
VIS    2025250     91400   15.2100 -117.4100      20.6        39       166        91
VIS    2025250     91400   15.2000 -117.4300      19.4        43       168        90
VIS    2025250     91400   15.2000 -117.5000      19.9        35       172        90
VIS    2025250     91400   15.2000 -117.5100      20.0        35       172        90
VIS    2025250     91400   15.1800 -118.3800      14.0        27       168        94
VIS    2025250     91400   15.1700 -118.4500      16.6        36       173       100
VIS    2025250     91400   15.1800 -118.4800      16.6        33       175       100
VIS    2025250     91400   15.1800 -118.4900      16.7        33       175       100
VIS    2025250     91400   15.1700 -119.0800      21.5        36       161        97
VIS    2025250     91400   15.1600 -119.1100      23.9        43       167        99
VIS    2025250     91400   15.1600 -119.1400      23.1        47       165        94
VIS    2025250     91400   15.1700 -119.1500      23.7        38       164        94
VIS    2025250     91400   15.1500 -119.1700      22.9        38       164       100
VIS    2025250     91400   15.1700 -119.2100      22.7        34       165        99
VIS    2025250     91400   15.1500 -119.2300      22.7        33       165        99
VIS    2025250     91400   15.1600 -119.2600      21.8        36       169       100
VIS    2025250     91400   15.1500 -119.3000      21.3        36       170       100
VIS    2025250     91400   15.1700 -119.3200      22.7        34       170        95
VIS    2025250     91400   15.1500 -119.3500      20.5        35       172       100
VIS    2025250     91400   15.1500 -119.3600      20.3        35       173       100
VIS    2025250     91400   15.1700 -119.3900      21.5        33       174        95
VIS    2025250     91400   15.1500 -119.4200      19.3        36       177       100
VIS    2025250     91400   15.1600 -119.4600      19.1        36       180        99
VIS    2025250     91400   15.1600 -119.4600      19.1        37       182        99
VIS    2025250     91400   15.1700 -119.5100      21.8        36       182        96
VIS    2025250     91400   15.1700 -119.5100      21.6        36       182        97
VIS    2025250     91400   15.1500 -119.6000      20.3        27       190        99
VIS    2025250     91400   15.1500 -119.6400      19.5        29       180       100
VIS    2025250     91400   15.1500 -119.6800      19.0        32       185        99
VIS    2025250     91400   15.1600 -119.7400      22.5        24       179        98
VIS    2025250     91400   15.1500 -119.7500      21.0        26       179        99
VIS    2025250     91400   15.3400 -110.5600       4.6        36       186        99
VIS    2025250     91400   15.3300 -110.6000       6.4        48       186        97
VIS    2025250     91400   15.3300 -110.6200       7.6        51       185        99
VIS    2025250     91400   15.3400 -110.7000       8.1        46       190        92
VIS    2025250     91400   15.3400 -110.7000       8.1        47       190        96
VIS    2025250     91400   15.3400 -110.7900       6.3        43       190        96
VIS    2025250     91400   15.3200 -111.2800       7.6        40       188        95
VIS    2025250     91400   15.3200 -111.3000       7.6        38       188        96
VIS    2025250     91400   15.3300 -111.3300       7.9        41       187       100
VIS    2025250     91400   15.3200 -111.3500       8.0        46       188        99
VIS    2025250     91400   15.3000 -111.5800       6.9        35       187        91
VIS    2025250     91400   15.3000 -111.6100       7.4        25       189       100
VIS    2025250     91400   15.3100 -111.6600      12.9        36       185        96
VIS    2025250     91400   15.3200 -111.6700      12.3        34       185        90
VIS    2025250     91400   15.3100 -111.7100      11.8        32       185        92
VIS    2025250     91400   15.3200 -111.7400      11.9        32       187        99
VIS    2025250     91400   15.3100 -112.1200      12.5        33       191       100
VIS    2025250     91400   15.2900 -112.1400      12.6        33       191       100
VIS    2025250     91400   15.3100 -112.1700      12.6        33       191        99
VIS    2025250     91400   15.2800 -113.0800       5.8        61       189        93
VIS    2025250     91400   15.2600 -113.1300       5.7        48       186        99
VIS    2025250     91400   15.2500 -114.0800       5.6       336       179       100
VIS    2025250     91400   15.2400 -114.1400       4.8       351       179        99
VIS    2025250     91400   15.2300 -115.0900      19.5        80       180        99
VIS    2025250     91400   15.2200 -115.1200      19.6        81       178        99
VIS    2025250     91400   15.2200 -115.6000      20.7        47       160        97
VIS    2025250     91400   15.2000 -115.6300      21.2        45       161        94
VIS    2025250     91400   15.2000 -115.6400      21.2        45       161        96
VIS    2025250     91400   15.1900 -117.2300      21.4        55       165        90
VIS    2025250     91400   15.1800 -117.2500      21.1        54       164        99
VIS    2025250     91400   15.1700 -117.2700      21.1        54       165        99
VIS    2025250     91400   15.1800 -117.4000      20.9        39       168        92
VIS    2025250     91400   15.1800 -117.4500      18.2        31       174        98
VIS    2025250     91400   15.1800 -117.5700      19.7        44       177       100
VIS    2025250     91400   15.1600 -118.2700      20.6        38       175        98
VIS    2025250     91400   15.1400 -119.0900      22.5        36       168       100
VIS    2025250     91400   15.1400 -119.1100      23.2        38       167        99
VIS    2025250     91400   15.1400 -119.1200      23.1        37       167        96
VIS    2025250     91400   15.1300 -119.1500      22.8        38       167        99
VIS    2025250     91400   15.1300 -119.1900      23.0        30       165        98
VIS    2025250     91400   15.1300 -119.2200      22.3        35       165        99
VIS    2025250     91400   15.1300 -119.2500      22.2        35       165        99
VIS    2025250     91400   15.1300 -119.2600      22.0        35       166       100
VIS    2025250     91400   15.1300 -119.3000      21.2        35       170       100
VIS    2025250     91400   15.1300 -119.3300      20.5        35       170       100
VIS    2025250     91400   15.1400 -119.3400      20.4        35       172       100
VIS    2025250     91400   15.1400 -119.3700      19.4        34       172       100
VIS    2025250     91400   15.1300 -119.4000      19.1        34       176       100
VIS    2025250     91400   15.1400 -119.4100      19.0        35       180       100
VIS    2025250     91400   15.1300 -119.4500      17.8        35       185       100
VIS    2025250     91400   15.1300 -119.4800      18.2        36       184        98
VIS    2025250     91400   15.1300 -119.5300      21.5        37       190       100
VIS    2025250     91400   15.1200 -119.5900      20.7        23       192        99
VIS    2025250     91400   15.1400 -119.6000      19.8        25       190        99
VIS    2025250     91400   15.1400 -119.6300      20.0        26       184       100
VIS    2025250     91400   15.1200 -119.6500      18.2        31       186        97
VIS    2025250     91400   15.1200 -119.7000      17.4        33       186        98
VIS    2025250     91400   15.1200 -119.7400      21.1        26       182        92
VIS    2025250     91400   15.3400 -109.1900       8.1        61       188        99
VIS    2025250     91400   15.3100 -110.5700       5.3        43       191        90
VIS    2025250     91400   15.3200 -110.5900       5.9        46       189        94
VIS    2025250     91400   15.3200 -110.6200       7.3        54       185        99
VIS    2025250     91400   15.3000 -111.2900       7.9        34       188        90
VIS    2025250     91400   15.2800 -111.3500       6.8        47       188        98
VIS    2025250     91400   15.3000 -111.3700       7.8        48       188        98
VIS    2025250     91400   15.2900 -111.8000      22.9        59       183        99
VIS    2025250     91400   15.2800 -112.1300      12.2        32       191        99
VIS    2025250     91400   15.2800 -112.1400      12.5        32       191        99
VIS    2025250     91400   15.2600 -112.2700      12.4        34       191        97
VIS    2025250     91400   15.2500 -113.0400       7.2        52       188       100
VIS    2025250     91400   15.2500 -113.0500       6.9        54       188        99
VIS    2025250     91400   15.2500 -113.1300       5.3        45       186        97
VIS    2025250     91400   15.2500 -113.3300       6.5        60       187       100
VIS    2025250     91400   15.2400 -113.3600       8.1        68       186        95
VIS    2025250     91400   15.2300 -113.5300      10.2        44       172        94
VIS    2025250     91400   15.2300 -113.5500       9.6        45       173        90
VIS    2025250     91400   15.2300 -113.7300       4.8        70       170        94
VIS    2025250     91400   15.2100 -114.1400       4.1       352       176        98
VIS    2025250     91400   15.1900 -115.6100      20.9        43       160        99
VIS    2025250     91400   15.1800 -115.6300      21.1        44       161        93
VIS    2025250     91400   15.2000 -115.6400      21.3        45       161        95
VIS    2025250     91400   15.1500 -117.1700       5.9        95       183        98
VIS    2025250     91400   15.1500 -117.1900       6.5       100       183       100
VIS    2025250     91400   15.1300 -118.2700      20.6        39       180        99
VIS    2025250     91400   15.1200 -118.4600      19.5        38       166        99
VIS    2025250     91400   15.1200 -118.4700      19.5        38       166        98
VIS    2025250     91400   15.1200 -119.0700      21.4        34       170       100
VIS    2025250     91400   15.1200 -119.0700      21.6        34       170       100
VIS    2025250     91400   15.1200 -119.1000      22.6        36       168       100
VIS    2025250     91400   15.1200 -119.1400      23.1        38       167        99
VIS    2025250     91400   15.1200 -119.1500      22.8        38       167        99
VIS    2025250     91400   15.1200 -119.1900      25.6        21       164        93
VIS    2025250     91400   15.1200 -119.2200      22.3        34       165        99
VIS    2025250     91400   15.1100 -119.2500      22.1        35       166       100
VIS    2025250     91400   15.1100 -119.2700      22.0        35       166       100
VIS    2025250     91400   15.1100 -119.2800      21.9        35       166       100
VIS    2025250     91400   15.1100 -119.3300      20.1        34       170        99
VIS    2025250     91400   15.1000 -119.3600      19.3        35       170       100
VIS    2025250     91400   15.1000 -119.3700      19.0        35       172       100
VIS    2025250     91400   15.1100 -119.4100      19.1        35       179        99
VIS    2025250     91400   15.1100 -119.4200      18.8        34       183       100
VIS    2025250     91400   15.1100 -119.4600      18.0        35       185       100
VIS    2025250     91400   15.1000 -119.4800      19.0        36       186       100
VIS    2025250     91400   15.1000 -119.5000      19.5        36       186       100
VIS    2025250     91400   15.1100 -119.5300      21.9        35       190       100
VIS    2025250     91400   15.1100 -119.6100      20.0        24       190       100
VIS    2025250     91400   15.1000 -119.6500      18.4        30       187        98
VIS    2025250     91400   15.1100 -119.6600      19.8        27       187        97
VIS    2025250     91400   15.1100 -119.7000      23.1        26       189       100
VIS    2025250     91400   15.3200 -109.0700       9.9        63       185        99
VIS    2025250     91400   15.3200 -109.0800       9.8        63       185        99
VIS    2025250     91400   15.3200 -109.2000       8.3        59       183        98
VIS    2025250     91400   15.3300 -109.2200       8.2        62       188        91
VIS    2025250     91400   15.2900 -110.6000       6.9        55       189        93
VIS    2025250     91400   15.2800 -110.6500       7.4        49       187        92
VIS    2025250     91400   15.2800 -111.3500       6.7        47       188        98
VIS    2025250     91400   15.2800 -111.3600       6.7        46       188        98
VIS    2025250     91400   15.2500 -111.8300      23.0        59       183        99
VIS    2025250     91400   15.2400 -112.1600       8.1        19       189       100
VIS    2025250     91400   15.2500 -112.2700      12.5        33       191        96
VIS    2025250     91400   15.2300 -113.0500       7.8        50       187        95
VIS    2025250     91400   15.2400 -113.0500       7.5        50       187        99
VIS    2025250     91400   15.2100 -113.1100       5.3        32       187        97
VIS    2025250     91400   15.2300 -113.1300       5.1        49       184        90
VIS    2025250     91400   15.2100 -113.3000       4.7        62       184        97
VIS    2025250     91400   15.2200 -113.3200       5.1        63       185        99
VIS    2025250     91400   15.2200 -113.3500       8.1        67       185        95
VIS    2025250     91400   15.2300 -113.3700       8.5        71       185        99
VIS    2025250     91400   15.2300 -113.4500       4.2       274       180        97
VIS    2025250     91400   15.2100 -113.5200       9.9        48       166        99
VIS    2025250     91400   15.2000 -113.5600       9.1        50       171        94
VIS    2025250     91400   15.2000 -113.5600       9.0        50       171        93
VIS    2025250     91400   15.2000 -113.6000       6.4        54       174        94
VIS    2025250     91400   15.2100 -113.6300       5.3        57       175        95
VIS    2025250     91400   15.2200 -113.7500       4.1        64       170        98
VIS    2025250     91400   15.1900 -114.0700       7.6        16       175       100
VIS    2025250     91400   15.1900 -115.0900      18.8        55       179        90
VIS    2025250     91400   15.1400 -117.4300      11.0        32       183        91
VIS    2025250     91400   15.1300 -117.6100      18.3        37       185        99
VIS    2025250     91400   15.1300 -117.6200      18.4        37       185       100
VIS    2025250     91400   15.1000 -118.3600      18.9        53       167        92
VIS    2025250     91400   15.1100 -118.3600      18.9        52       167        94
VIS    2025250     91400   15.1000 -118.4400      19.1        40       167       100
VIS    2025250     91400   15.1100 -118.4500      19.5        38       166       100
VIS    2025250     91400   15.0900 -118.4800      19.4        39       166        97
VIS    2025250     91400   15.0900 -119.0700      21.3        36       170       100
VIS    2025250     91400   15.1000 -119.0800      21.4        35       170       100
VIS    2025250     91400   15.0900 -119.1100      22.2        36       167       100
VIS    2025250     91400   15.0900 -119.1400      22.9        35       167       100
VIS    2025250     91400   15.0900 -119.2200      21.6        34       166       100
VIS    2025250     91400   15.1000 -119.2400      23.3        32       166        92
VIS    2025250     91400   15.0900 -119.2800      22.0        36       166       100
VIS    2025250     91400   15.0900 -119.3100      21.6        36       166       100
VIS    2025250     91400   15.0800 -119.3600      20.1        35       170       100
VIS    2025250     91400   15.1000 -119.3800      20.6        32       172        90
VIS    2025250     91400   15.0900 -119.4100      19.6        35       179        98
VIS    2025250     91400   15.0800 -119.4400      20.0        37       185       100
VIS    2025250     91400   15.0800 -119.4700      19.9        38       190       100
VIS    2025250     91400   15.0800 -119.6300      19.2        27       187       100
VIS    2025250     91400   15.0700 -119.7200      19.1        40       183        92
VIS    2025250     91400   15.3100 -109.0700       9.9        62       184        99
VIS    2025250     91400   15.3100 -109.0900       9.9        62       185        99
VIS    2025250     91400   15.3000 -109.1200       9.7        62       183        98
VIS    2025250     91400   15.3100 -109.1500       9.2        64       185        99
VIS    2025250     91400   15.3100 -109.1900       8.1        61       185        95
VIS    2025250     91400   15.3000 -109.2100       7.8        52       185        93
VIS    2025250     91400   15.2600 -110.5600       8.7        60       192        98
VIS    2025250     91400   15.2600 -110.5900       8.3        52       192        99
VIS    2025250     91400   15.2600 -110.6000       8.2        48       192        99
VIS    2025250     91400   15.2700 -110.6300       7.7        46       187        99
VIS    2025250     91400   15.2400 -111.6800       4.1        49       186        96
VIS    2025250     91400   15.2200 -112.1400       7.5        23       189        95
VIS    2025250     91400   15.2300 -112.1500       8.0        20       189        99
VIS    2025250     91400   15.2300 -112.3000      11.5        34       191        92
VIS    2025250     91400   15.2200 -112.3700      11.5        33       191        95
VIS    2025250     91400   15.2100 -113.0500      12.3        59       185        93
VIS    2025250     91400   15.1900 -113.1800       8.7        56       180        94
VIS    2025250     91400   15.2000 -113.2600       5.1        63       183        97
VIS    2025250     91400   15.2000 -113.5000      13.7        52       165        91
VIS    2025250     91400   15.1900 -113.5600       8.9        51       168        96
VIS    2025250     91400   15.1800 -113.5800       8.5        51       168        94
VIS    2025250     91400   15.2000 -113.6200       5.9        53       174        93
VIS    2025250     91400   15.1800 -114.0400       7.8        13       173       100
VIS    2025250     91400   15.1800 -114.0400       7.7        13       173       100
VIS    2025250     91400   15.1700 -114.0900       7.7        21       176       100
VIS    2025250     91400   15.1800 -114.1000       7.5        17       176       100
VIS    2025250     91400   15.1000 -117.4300      14.6        32       179        90
VIS    2025250     91400   15.1000 -117.4400      14.9        33       177        94
VIS    2025250     91400   15.1100 -117.6200      18.0        37       192        97
VIS    2025250     91400   15.0800 -118.1100      17.4        42       183        97
VIS    2025250     91400   15.0800 -118.2000      19.6        31       178        92
VIS    2025250     91400   15.0800 -118.2300      19.1        34       177        92
VIS    2025250     91400   15.0900 -118.2400      19.2        34       177        90
VIS    2025250     91400   15.0700 -118.3100      20.5        44       176        90
VIS    2025250     91400   15.0700 -118.3400      19.3        45       174        99
VIS    2025250     91400   15.0800 -118.3500      18.9        52       172        94
VIS    2025250     91400   15.0700 -118.3900      19.0        48       170        99
VIS    2025250     91400   15.0700 -118.4700      20.7        41       168        99
VIS    2025250     91400   15.0700 -118.4800      20.7        41       167       100
VIS    2025250     91400   15.0700 -119.0000      21.5        28       172        99
VIS    2025250     91400   15.0600 -119.0200      22.0        28       171        99
VIS    2025250     91400   15.0600 -119.0300      22.3        30       170       100
VIS    2025250     91400   15.0600 -119.0700      21.7        36       168       100
VIS    2025250     91400   15.0700 -119.1000      21.5        37       167       100
VIS    2025250     91400   15.0600 -119.1200      21.3        39       167       100
VIS    2025250     91400   15.0700 -119.1300      21.8        37       167       100
VIS    2025250     91400   15.0600 -119.2600      21.0        43       167       100
VIS    2025250     91400   15.0600 -119.2800      20.8        42       167       100
VIS    2025250     91400   15.0500 -119.3100      20.8        39       168       100
VIS    2025250     91400   15.0500 -119.3200      21.0        38       167       100
VIS    2025250     91400   15.0500 -119.3500      21.3        36       170       100
VIS    2025250     91400   15.0500 -119.3900      20.9        36       179        99
VIS    2025250     91400   15.0500 -119.4000      20.8        37       179        99
VIS    2025250     91400   15.0700 -119.4400      21.9        35       187        96
VIS    2025250     91400   15.0600 -119.4900      20.2        38       193       100
VIS    2025250     91400   15.0600 -119.5000      20.3        38       193       100
VIS    2025250     91400   15.0500 -119.6200      19.8        26       192        94
VIS    2025250     91400   15.0500 -119.6300      18.9        35       187        90
VIS    2025250     91400   15.0700 -119.6700      19.5        30       187        92
VIS    2025250     91400   15.0500 -119.7200      18.0        38       181        94
VIS    2025250     91400   15.0600 -119.7400      18.7        38       180        91
VIS    2025250     91400   15.2800 -109.0400      10.2        60       183        99
VIS    2025250     91400   15.2700 -109.0800       9.6        61       176        98
VIS    2025250     91400   15.2700 -109.0900       9.7        62       176        98
VIS    2025250     91400   15.2800 -109.1400       9.7        64       184        98
VIS    2025250     91400   15.2800 -109.1600       9.3        66       185        97
VIS    2025250     91400   15.2900 -109.2100       7.6        46       183        95
VIS    2025250     91400   15.2100 -112.1500       7.5        24       189        93
VIS    2025250     91400   15.1900 -112.2500      10.2        45       189       100
VIS    2025250     91400   15.1800 -113.2100       8.1        61       181        99
VIS    2025250     91400   15.1600 -113.5200       8.0        59       166        99
VIS    2025250     91400   15.1700 -113.5600       9.0        50       166        93
VIS    2025250     91400   15.1700 -113.6400       4.8        49       174        97
VIS    2025250     91400   15.1700 -113.9400       4.1       296       174        94
VIS    2025250     91400   15.1600 -114.0500       8.5        15       173        93
VIS    2025250     91400   15.1600 -114.0900       8.1        22       178       100
VIS    2025250     91400   15.0700 -117.4700      19.7        35       175        95
VIS    2025250     91400   15.0700 -117.4900      20.0        37       175        95
VIS    2025250     91400   15.0600 -118.1700      20.2        25       182        94
VIS    2025250     91400   15.0700 -118.2100      18.7        30       179        90
VIS    2025250     91400   15.0600 -118.3000      19.9        42       176        92
VIS    2025250     91400   15.0500 -118.3200      20.4        43       175        94
VIS    2025250     91400   15.0500 -118.5000      20.7        37       172        96
VIS    2025250     91400   15.0400 -118.9800      20.6        29       172       100
VIS    2025250     91400   15.0400 -119.0100      20.7        30       170       100
VIS    2025250     91400   15.0400 -119.0500      21.8        35       169       100
VIS    2025250     91400   15.0500 -119.0700      21.6        37       168       100
VIS    2025250     91400   15.0500 -119.1000      21.3        38       168       100
VIS    2025250     91400   15.0400 -119.1200      21.1        39       167       100
VIS    2025250     91400   15.0400 -119.1900      21.6        41       171        94
VIS    2025250     91400   15.0400 -119.2300      20.7        41       170       100
VIS    2025250     91400   15.0400 -119.2500      20.9        41       170       100
VIS    2025250     91400   15.0500 -119.2900      20.9        40       170       100
VIS    2025250     91400   15.0500 -119.3100      22.0        36       170        98
VIS    2025250     91400   15.0400 -119.3300      21.0        38       170       100
VIS    2025250     91400   15.0500 -119.3600      22.7        33       171        95
VIS    2025250     91400   15.0300 -119.3700      21.4        37       176       100
VIS    2025250     91400   15.0500 -119.4000      22.3        34       179        98
VIS    2025250     91400   15.0400 -119.4800      22.1        35       193        94
VIS    2025250     91400   15.0200 -119.5800      19.5        32       193        98
VIS    2025250     91400   15.0300 -119.6100      19.4        35       190        93
VIS    2025250     91400   15.0300 -119.6400      20.5        42       179        99
VIS    2025250     91400   15.0200 -119.7000      18.5        31       178        99
VIS    2025250     91400   15.0300 -119.7300      17.8        39       176        99
VIS    2025250     91400   15.0300 -119.7400      18.0        40       176        96
VIS    2025250     91400   15.2400 -109.0800      10.2        58       176        99
VIS    2025250     91400   15.2500 -109.1000       9.7        59       175        98
VIS    2025250     91400   15.2500 -109.1300       9.2        58       176        98
VIS    2025250     91400   15.2400 -109.1600       9.1        61       177       100
VIS    2025250     91400   15.2400 -109.2000       8.0        62       181        99
VIS    2025250     91400   15.2500 -109.2100       7.3        59       184        96
VIS    2025250     91400   15.2500 -109.2500       4.4        40       192        94
VIS    2025250     91400   15.1700 -112.2400      10.2        44       189       100
VIS    2025250     91400   15.1800 -112.3900      17.4        35       191        97
VIS    2025250     91400   15.1400 -113.2300       4.7        50       179        99
VIS    2025250     91400   15.1400 -113.2400       4.8        45       179        96
VIS    2025250     91400   15.1500 -113.3700       4.8        65       181        92
VIS    2025250     91400   15.1400 -113.5100       8.1        66       166        98
VIS    2025250     91400   15.1500 -113.5200       8.0        58       166        98
VIS    2025250     91400   15.1300 -113.5600      10.0        41       169        92
VIS    2025250     91400   15.1400 -113.9200       4.4       290       171        91
VIS    2025250     91400   15.1200 -114.0200      11.0        22       177       100
VIS    2025250     91400   15.1300 -114.0200      10.9        21       175       100
VIS    2025250     91400   15.1400 -114.0700      10.7        17       179        95
VIS    2025250     91400   15.0900 -115.6000      20.1        42       163        96
VIS    2025250     91400   15.1000 -115.6100      20.0        43       164        97
VIS    2025250     91400   15.0800 -115.6400      20.9        42       164        97
VIS    2025250     91400   15.0500 -117.3000      11.2        35       178        96
VIS    2025250     91400   15.0500 -117.3200      11.5        33       176        92
VIS    2025250     91400   15.0600 -117.4200      12.9        37       177        92
VIS    2025250     91400   15.0600 -117.4900      20.0        37       175        92
VIS    2025250     91400   15.0500 -117.5000      20.1        38       175        94
VIS    2025250     91400   15.0500 -118.1000      20.1        32       182        96
VIS    2025250     91400   15.0400 -118.1800      18.9        25       184        96
VIS    2025250     91400   15.0400 -118.1900      18.6        25       180        98
VIS    2025250     91400   15.0500 -118.2800      22.3        42       176        97
VIS    2025250     91400   15.0500 -118.3100      21.5        41       176        99
VIS    2025250     91400   15.0400 -118.3400      21.1        40       174        98
VIS    2025250     91400   15.0200 -118.9800      20.6        32       173       100
VIS    2025250     91400   15.0200 -119.0000      20.7        33       172       100
VIS    2025250     91400   15.0300 -119.0100      20.7        32       172       100
VIS    2025250     91400   15.0100 -119.0600      21.2        37       169       100
VIS    2025250     91400   15.0300 -119.0600      21.3        37       168       100
VIS    2025250     91400   15.0300 -119.1000      22.5        35       168        91
VIS    2025250     91400   15.0100 -119.1300       4.1       348       171       100
VIS    2025250     91400   15.0100 -119.1900      21.1        40       171       100
VIS    2025250     91400   15.0100 -119.2000      20.9        41       171       100
VIS    2025250     91400   15.0100 -119.2400      21.0        41       171       100
VIS    2025250     91400   15.0100 -119.2500      21.1        41       170       100
VIS    2025250     91400   15.0200 -119.2900      21.4        40       170       100
VIS    2025250     91400   15.0200 -119.3100      21.1        39       172       100
VIS    2025250     91400   15.0200 -119.3400      22.2        36       173        91
VIS    2025250     91400   15.0200 -119.3700      22.7        34       176        94
VIS    2025250     91400   15.0200 -119.3700      22.8        34       176        95
VIS    2025250     91400   15.0000 -119.4100      21.5        35       179       100
VIS    2025250     91400   15.0000 -119.4300      21.4        34       185       100
VIS    2025250     91400   15.0100 -119.5300      19.8        34       191        99
VIS    2025250     91400   15.0000 -119.5400      19.8        33       193        99
VIS    2025250     91400   15.0000 -119.6600      20.1        30       180        98
VIS    2025250     91400   15.0000 -119.6700      19.5        30       180        98
VIS    2025250     91400   15.0000 -119.6900      18.9        29       179       100
VIS    2025250     91400   15.0100 -119.7400      17.6        39       176       100
VIS    2025250     91400   15.0200 -119.7400      18.8        35       176        95
VIS    2025250     91400   15.2300 -109.0900      10.1        56       176        99
VIS    2025250     91400   15.2200 -109.1200       9.5        54       176       100
VIS    2025250     91400   15.2200 -109.1300       9.4        55       176       100
VIS    2025250     91400   15.2200 -109.1800       9.1        59       177       100
VIS    2025250     91400   15.2300 -109.2000       8.0        64       179        99
VIS    2025250     91400   15.2400 -109.2100       7.4        63       184        98
VIS    2025250     91400   15.2200 -109.2700       7.8        49       192        90
VIS    2025250     91400   15.2200 -109.3500      10.1        35       192       100
VIS    2025250     91400   15.1500 -112.0600      23.5        44       192        98
VIS    2025250     91400   15.1400 -112.2200       5.4        40       186        99
VIS    2025250     91400   15.1100 -113.2000       7.4        51       175        99
VIS    2025250     91400   15.1300 -113.2300       5.4        48       177        99
VIS    2025250     91400   15.1100 -113.5400       7.5        57       169        94
VIS    2025250     91400   15.1100 -113.5700      10.1        42       171        95
VIS    2025250     91400   15.1200 -113.5800      10.4        40       171        97
VIS    2025250     91400   15.1100 -113.7900       5.7        28       168        99
VIS    2025250     91400   15.1000 -113.8200       5.6        28       168        92
VIS    2025250     91400   15.1100 -114.0100      10.4        23       177        99
VIS    2025250     91400   15.1000 -114.0400      10.6        15       179        97
VIS    2025250     91400   15.0700 -115.4100      22.6         6       174        99
VIS    2025250     91400   15.0600 -115.4400      20.3        55       172        96
VIS    2025250     91400   15.0600 -115.5600      19.7        45       164        96
VIS    2025250     91400   15.0700 -115.6200      21.2        41       163        98
VIS    2025250     91400   15.0600 -115.6500      20.5        44       165       100
VIS    2025250     91400   15.0300 -117.3100      11.4        35       179        97
VIS    2025250     91400   15.0200 -117.3300      12.4        31       179        97
VIS    2025250     91400   15.0200 -117.4600      13.1        40       174        94
VIS    2025250     91400   15.0000 -118.4400      22.2        24       174        99
VIS    2025250     91400   14.9900 -118.9500      21.0        32       171       100
VIS    2025250     91400   15.0100 -118.9600      22.1        29       173        92
VIS    2025250     91400   15.0000 -119.0100      20.9        35       172       100
VIS    2025250     91400   15.0000 -119.0300      21.0        36       170       100
VIS    2025250     91400   14.9900 -119.0400      21.2        37       170       100
VIS    2025250     91400   15.0100 -119.0600      22.5        34       169        95
VIS    2025250     91400   14.9900 -119.1000      20.0        39       172       100
VIS    2025250     91400   14.9900 -119.1800      21.6        40       171       100
VIS    2025250     91400   14.9800 -119.2100      21.6        40       171       100
VIS    2025250     91400   15.0000 -119.2400      21.3        41       171       100
VIS    2025250     91400   14.9900 -119.2700      21.3        40       170       100
VIS    2025250     91400   15.0000 -119.2800      21.5        39       170       100
VIS    2025250     91400   14.9800 -119.3000      21.3        38       171       100
VIS    2025250     91400   14.9900 -119.3400      21.2        38       177       100
VIS    2025250     91400   15.0000 -119.3700      22.5        35       176        92
VIS    2025250     91400   15.0000 -119.3800      22.6        35       176        92
VIS    2025250     91400   15.0000 -119.4200      22.8        32       180        93
VIS    2025250     91400   14.9900 -119.4300      21.3        33       187       100
VIS    2025250     91400   14.9800 -119.4800      21.2        25       192        98
VIS    2025250     91400   14.9800 -119.4900      20.3        29       191        98
VIS    2025250     91400   14.9900 -119.5400      19.8        33       193       100
VIS    2025250     91400   14.9800 -119.5800      19.0        32       190        99
VIS    2025250     91400   14.9800 -119.6000      18.8        30       186        99
VIS    2025250     91400   14.9900 -119.6400      22.6        28       184        91
VIS    2025250     91400   14.9800 -119.6800      19.2        28       182       100
VIS    2025250     91400   14.9800 -119.7200      17.2        32       178        99
VIS    2025250     91400   15.2200 -109.0900      10.2        52       176        99
VIS    2025250     91400   15.2200 -109.1000      10.0        53       176        99
VIS    2025250     91400   15.2100 -109.1500       9.2        57       177       100
VIS    2025250     91400   15.2100 -109.1800       9.1        59       177       100
VIS    2025250     91400   15.2100 -109.2000       8.6        60       179       100
VIS    2025250     91400   15.2000 -109.2400       7.7        63       185        96
VIS    2025250     91400   15.2100 -109.2700       8.1        49       192        94
VIS    2025250     91400   15.2100 -109.3000      10.2        45       194        99
VIS    2025250     91400   15.1900 -109.3300       9.4        47       192        99
VIS    2025250     91400   15.1900 -109.3400       9.3        45       192        98
VIS    2025250     91400   15.1900 -109.3700       9.4        36       192        98
VIS    2025250     91400   15.1300 -112.0600      23.8        44       192        97
VIS    2025250     91400   15.1000 -112.9700       4.7        99       189       100
VIS    2025250     91400   15.1100 -113.1700       8.2        52       174        96
VIS    2025250     91400   15.1100 -113.1900       7.9        49       175        97
VIS    2025250     91400   15.0900 -113.4900      11.7        59       167        92
VIS    2025250     91400   15.0800 -113.5000      10.8        59       168        93
VIS    2025250     91400   15.0900 -113.5400       8.8        55       169        92
VIS    2025250     91400   15.0900 -113.5800       9.6        44       171        97
VIS    2025250     91400   15.1000 -113.5900      10.1        41       171       100
VIS    2025250     91400   15.0900 -113.7700       5.9        31       168        98
VIS    2025250     91400   15.0800 -113.8000       6.2        33       168        96
VIS    2025250     91400   15.0800 -113.9400       7.6        26       172        99
VIS    2025250     91400   15.0700 -113.9500       7.0        23       171        97
VIS    2025250     91400   15.0900 -113.9900       6.8        27       171        96
VIS    2025250     91400   15.0900 -114.0100       7.5        25       173        96
VIS    2025250     91400   15.0400 -115.4100      20.7         1       172        91
VIS    2025250     91400   15.0600 -115.4300      20.6         2       172        90
VIS    2025250     91400   15.0400 -115.4600      20.4        55       172        98
VIS    2025250     91400   15.0400 -115.5800      20.5        45       164       100
VIS    2025250     91400   15.0500 -115.5900      20.4        44       164        99
VIS    2025250     91400   15.0300 -115.6200      20.3        43       165       100
VIS    2025250     91400   15.0500 -115.6600      20.4        45       165        99
VIS    2025250     91400   15.0100 -117.2800      12.6        36       179        94
VIS    2025250     91400   15.0000 -117.2900      12.5        35       179        97
VIS    2025250     91400   15.0200 -117.3300      12.6        32       179        98
VIS    2025250     91400   15.0000 -117.3400      13.9        32       179        99
VIS    2025250     91400   14.9800 -118.3300      20.4        38       183       100
VIS    2025250     91400   14.9800 -118.3800      19.9        45       176        92
VIS    2025250     91400   14.9900 -118.3900      19.9        45       176        92
VIS    2025250     91400   14.9800 -118.9800      22.7        30       169        93
VIS    2025250     91400   14.9800 -119.0100      21.2        35       172       100
VIS    2025250     91400   14.9800 -119.0100      21.3        36       172       100
VIS    2025250     91400   14.9800 -119.0600      22.6        34       173        93
VIS    2025250     91400   14.9800 -119.0800      22.2        35       173        93
VIS    2025250     91400   14.9600 -119.1800      21.5        40       171       100
VIS    2025250     91400   14.9800 -119.2100      23.1        36       169        94
VIS    2025250     91400   14.9600 -119.2200      22.0        40       171       100
VIS    2025250     91400   14.9600 -119.2600      21.8        40       171       100
VIS    2025250     91400   14.9700 -119.3000      21.4        38       171       100
VIS    2025250     91400   14.9700 -119.3000      21.3        38       171       100
VIS    2025250     91400   14.9700 -119.3300      21.3        37       174       100
VIS    2025250     91400   14.9700 -119.3600      21.0        39       181       100
VIS    2025250     91400   14.9600 -119.3900      19.9        39       186       100
VIS    2025250     91400   14.9600 -119.4100      19.6        35       187       100
VIS    2025250     91400   14.9700 -119.4400      22.1        28       191        91
VIS    2025250     91400   14.9600 -119.4600      20.5        28       193       100
VIS    2025250     91400   14.9600 -119.5100      19.5        36       191        99
VIS    2025250     91400   14.9600 -119.6900      18.6        27       184       100
VIS    2025250     91400   14.9600 -119.6900      18.1        27       183        99
VIS    2025250     91400   15.1900 -109.0600      10.1        61       189        98
VIS    2025250     91400   15.1700 -109.1300       8.5        47       180        98
VIS    2025250     91400   15.1700 -109.1600       9.1        55       180       100
VIS    2025250     91400   15.1700 -109.1900       9.3        57       183        99
VIS    2025250     91400   15.1700 -109.2000       9.2        58       183        99
VIS    2025250     91400   15.1700 -109.3100       9.1        49       192        91
VIS    2025250     91400   15.1700 -109.3400       8.7        44       192        99
VIS    2025250     91400   15.1600 -109.3700       8.3        36       190        99
VIS    2025250     91400   15.1800 -109.3700       9.4        35       192        98
VIS    2025250     91400   15.1400 -110.6800      10.5        45       191        98
VIS    2025250     91400   15.1000 -112.1600       7.4        24       188       100
VIS    2025250     91400   15.0900 -112.9700       5.0       104       189        97
VIS    2025250     91400   15.0700 -113.1400      10.2        52       172        94
VIS    2025250     91400   15.0800 -113.1700       9.6        47       172        90
VIS    2025250     91400   15.0900 -113.2000       8.4        47       175        93
VIS    2025250     91400   15.0700 -113.5600       8.5        50       169        97
VIS    2025250     91400   15.0600 -113.7600       4.0       356       168        96
VIS    2025250     91400   15.0600 -113.9500       7.4        25       172       100
VIS    2025250     91400   15.0700 -113.9500       7.5        26       171        99
VIS    2025250     91400   15.0700 -113.9900       6.8        26       172       100
VIS    2025250     91400   15.0200 -115.4600      20.3        51       172        91
VIS    2025250     91400   15.0200 -115.5400      20.1        51       174       100
VIS    2025250     91400   15.0300 -115.5800      20.2        45       167       100
VIS    2025250     91400   15.0300 -115.6000      20.2        43       168       100
VIS    2025250     91400   14.9800 -117.2800      14.7        36       179       100
VIS    2025250     91400   14.9900 -117.3000      13.5        36       179       100
VIS    2025250     91400   14.9900 -117.3200      13.2        34       179        99
VIS    2025250     91400   14.9700 -117.3700      15.3        45       180       100
VIS    2025250     91400   14.9800 -117.3900      18.3        45       177        95
VIS    2025250     91400   14.9700 -117.4400      18.7        38       176        90
VIS    2025250     91400   14.9900 -117.5800       9.8        76       181        99
VIS    2025250     91400   14.9600 -117.7900       4.7        84       177        92
VIS    2025250     91400   14.9600 -118.9900      22.3        33       168        92
VIS    2025250     91400   14.9600 -119.0300      22.5        34       173        94
VIS    2025250     91400   14.9400 -119.0700      19.4        38       175        99
VIS    2025250     91400   14.9400 -119.0700      18.9        37       175        96
VIS    2025250     91400   14.9500 -119.1000      20.0        40       173       100
VIS    2025250     91400   14.9500 -119.2300      23.3        36       172        94
VIS    2025250     91400   14.9500 -119.2500      23.3        37       173        93
VIS    2025250     91400   14.9500 -119.3600      20.9        39       183       100
VIS    2025250     91400   14.9300 -119.3900      19.6        40       184       100
VIS    2025250     91400   14.9400 -119.4300      19.5        33       190       100
VIS    2025250     91400   14.9300 -119.4800      19.2        32       189        97
VIS    2025250     91400   14.9400 -119.4900      19.3        35       192        98
VIS    2025250     91400   14.9300 -119.5400      18.1        38       189        99
VIS    2025250     91400   14.9300 -119.5800      17.5        30       188        99
VIS    2025250     91400   15.1500 -109.0600      11.2        53       181        98
VIS    2025250     91400   15.1500 -109.1100       7.2        53       182        99
VIS    2025250     91400   15.1500 -109.1100       7.1        48       184       100
VIS    2025250     91400   15.1600 -109.1600       9.1        55       180       100
VIS    2025250     91400   15.1600 -109.1700       9.2        55       183       100
VIS    2025250     91400   15.1600 -109.2000       9.2        57       183        99
VIS    2025250     91400   15.1500 -109.2300       9.0        56       186        99
VIS    2025250     91400   15.1600 -109.3100       9.1        53       191       100
VIS    2025250     91400   15.1400 -109.3500       9.0        20       189       100
VIS    2025250     91400   15.1500 -109.3700       8.9        26       190       100
VIS    2025250     91400   15.1400 -109.3800       8.8        28       190       100
VIS    2025250     91400   15.0500 -113.0900       8.9        46       174        96
VIS    2025250     91400   15.0500 -113.1300       8.8        54       172        96
VIS    2025250     91400   15.0400 -113.2000       4.7        58       176       100
VIS    2025250     91400   15.0600 -113.2400       4.9        44       180       100
VIS    2025250     91400   15.0400 -113.5600       5.1        43       169        99
VIS    2025250     91400   15.0400 -113.6700       5.7        40       163        93
VIS    2025250     91400   15.0400 -113.7200       4.3         7       164       100
VIS    2025250     91400   15.0300 -113.8700      12.3        35       165        99
VIS    2025250     91400   15.0200 -113.9600       9.6        13       171        92
VIS    2025250     91400   15.0400 -113.9900       6.8        25       172        98
VIS    2025250     91400   15.0100 -115.5800      20.0        45       171       100
VIS    2025250     91400   15.0000 -115.5900      19.8        45       171       100
VIS    2025250     91400   14.9600 -117.2600      13.4        34       178        91
VIS    2025250     91400   14.9600 -117.2700      14.0        35       179        97
VIS    2025250     91400   14.9600 -117.3400      18.8        47       180       100
VIS    2025250     91400   14.9700 -117.3600      15.3        46       180       100
VIS    2025250     91400   14.9600 -117.3700      15.5        47       180        99
VIS    2025250     91400   14.9700 -117.4400      19.3        38       176        97
VIS    2025250     91400   14.9500 -117.5300       7.0        84       181        96
VIS    2025250     91400   14.9500 -117.5400       6.7        86       180        96
VIS    2025250     91400   14.9500 -117.7800       4.3        89       178        98
VIS    2025250     91400   14.9200 -119.4500      19.6        31       187        99
VIS    2025250     91400   14.9200 -119.4900      19.3        34       187        94
VIS    2025250     91400   14.9100 -119.5400      17.5        33       187       100
VIS    2025250     91400   14.9100 -119.5500      17.6        31       188        98
VIS    2025250     91400   15.1200 -109.0700      11.4        57       179        94
VIS    2025250     91400   15.1400 -109.1100       7.5        54       182        98
VIS    2025250     91400   15.1200 -109.1200       8.3        55       178        98
VIS    2025250     91400   15.1300 -109.1600       8.2        47       186       100
VIS    2025250     91400   15.1300 -109.2000       8.9        53       185        98
VIS    2025250     91400   15.1200 -109.2700       6.9       356       191        99
VIS    2025250     91400   15.0200 -113.0700      10.3        46       175        98
VIS    2025250     91400   15.0400 -113.0800       9.6        44       174        98
VIS    2025250     91400   15.0300 -113.1900      13.1        12       173        92
VIS    2025250     91400   15.0300 -113.3100      17.7        33       179        98
VIS    2025250     91400   15.0200 -113.5700       5.2        38       168       100
VIS    2025250     91400   15.0200 -113.7200       5.4        22       164        94
VIS    2025250     91400   15.0100 -113.8600      12.5        34       164        96
VIS    2025250     91400   15.0000 -113.8800      12.6        34       164        95
VIS    2025250     91400   15.0000 -113.9600      11.3        11       171        96
VIS    2025250     91400   15.0000 -113.9600      10.9        11       171        99
VIS    2025250     91400   14.9800 -114.9100      18.8        18       174       100
VIS    2025250     91400   14.9800 -115.5600      18.4        44       172        94
VIS    2025250     91400   14.9300 -117.2400      13.7        37       176        99
VIS    2025250     91400   14.9500 -117.2600      13.5        35       178        92
VIS    2025250     91400   14.9500 -117.2700      13.7        35       178        91
VIS    2025250     91400   14.9400 -117.3200      19.8        45       180        95
VIS    2025250     91400   14.9200 -117.3400      20.6        46       179        95
VIS    2025250     91400   14.9400 -117.4900       6.9        86       183        98
VIS    2025250     91400   14.9400 -117.5200       7.0        85       181        97
VIS    2025250     91400   14.9200 -117.5600       6.5        91       180        95
VIS    2025250     91400   14.9200 -117.5700       6.4        92       180        96
VIS    2025250     91400   14.9300 -117.8400       4.9        61       179        91
VIS    2025250     91400   14.9000 -118.3900      23.4        56       174        91
VIS    2025250     91400   14.8800 -119.3900      17.5        37       186       100
VIS    2025250     91400   15.1100 -109.0800      11.9        62       179        91
VIS    2025250     91400   15.1100 -109.1200       8.6        57       178        92
VIS    2025250     91400   15.1000 -109.1500       8.5        40       185        95
VIS    2025250     91400   15.1000 -109.1800       8.9        43       185        99
VIS    2025250     91400   15.1000 -109.2100       8.9        46       185        98
VIS    2025250     91400   15.1000 -109.3400       5.0       333       194        91
VIS    2025250     91400   15.0400 -111.8400      18.4        27       191        93
VIS    2025250     91400   15.0000 -113.0300      10.9        49       176        97
VIS    2025250     91400   15.0100 -113.0300      10.9        49       175        98
VIS    2025250     91400   15.0200 -113.0600      10.3        47       175        98
VIS    2025250     91400   15.0100 -113.1100      12.2        41       173        99
VIS    2025250     91400   15.0100 -113.1200      11.6        43       173        93
VIS    2025250     91400   15.0100 -113.1900       9.1        41       172        92
VIS    2025250     91400   14.9900 -113.5100       8.4        47       164        98
VIS    2025250     91400   14.9800 -113.5400       8.4        42       165        90
VIS    2025250     91400   14.9800 -113.5900       8.4        26       163        97
VIS    2025250     91400   15.0000 -113.8700      12.6        34       164        94
VIS    2025250     91400   15.0000 -113.8800      12.6        34       164        94
VIS    2025250     91400   14.9900 -113.9500       4.7       353       173        91
VIS    2025250     91400   14.9800 -113.9600       5.0       354       173        93
VIS    2025250     91400   14.9700 -114.9000      21.3         7       177        99
VIS    2025250     91400   14.9500 -114.9200      18.4        18       176        95
VIS    2025250     91400   14.9200 -117.2500      13.0        37       176        99
VIS    2025250     91400   14.9100 -117.3200      20.3        48       175        98
VIS    2025250     91400   14.9100 -117.3500      25.1        47       179       100
VIS    2025250     91400   14.9200 -117.5000       6.1        89       183        96
VIS    2025250     91400   14.9100 -117.5600       6.4        90       180        98
VIS    2025250     91400   14.8700 -119.4600      18.6        36       184        99
VIS    2025250     91400   14.8600 -119.4900      34.2        59       185        99
VIS    2025250     91400   14.8600 -119.5000      34.2        59       186        99
VIS    2025250     91400   15.0700 -109.0800      11.7        57       177        99
VIS    2025250     91400   15.0700 -109.1000      11.8        58       177        99
VIS    2025250     91400   15.0900 -109.1400       8.3        34       184        90
VIS    2025250     91400   15.0800 -109.1600       8.8        35       184        93
VIS    2025250     91400   15.0800 -109.2000       9.4        45       183        99
VIS    2025250     91400   15.0700 -109.2200       9.6        47       183        97
VIS    2025250     91400   15.0700 -109.2600       8.5        45       187        92
VIS    2025250     91400   14.9900 -112.3400       4.9       226       191        93
VIS    2025250     91400   14.9900 -113.0400      11.4        48       175        93
VIS    2025250     91400   14.9800 -113.4800       8.0        60       162        93
VIS    2025250     91400   14.9700 -113.5400       7.8        39       163        92
VIS    2025250     91400   14.9600 -113.5600       9.4        36       161        95
VIS    2025250     91400   14.9600 -113.5800      11.3        36       159        96
VIS    2025250     91400   14.9500 -114.8900      21.8         9       176       100
VIS    2025250     91400   14.8800 -117.2300      19.6        47       180        98
VIS    2025250     91400   14.8800 -117.2500      20.7        47       180        90
VIS    2025250     91400   14.9000 -117.3300      19.8        45       175       100
VIS    2025250     91400   14.8800 -117.3300      19.4        46       175        90
VIS    2025250     91400   14.8600 -118.1700      21.3        49       179       100
VIS    2025250     91400   14.8300 -119.7300      15.6        36       190        95
VIS    2025250     91400   14.8300 -119.7700      16.8        31       189        97
VIS    2025250     91400   15.0600 -109.0800      11.6        55       177        99
VIS    2025250     91400   15.0500 -109.1000      11.1        48       178       100
VIS    2025250     91400   15.0600 -109.1500       8.4        29       182        95
VIS    2025250     91400   15.0500 -109.1700       8.4        43       182        96
VIS    2025250     91400   15.0700 -109.1900       9.5        48       183        96
VIS    2025250     91400   15.0400 -109.2300       9.5        49       183       100
VIS    2025250     91400   15.0500 -109.3600       7.6       348       193        99
VIS    2025250     91400   14.9700 -112.1900       6.9        26       189        94
VIS    2025250     91400   14.9700 -112.3400       4.5       224       191        95
VIS    2025250     91400   14.9700 -112.9900      11.4        45       177        91
VIS    2025250     91400   14.9500 -113.1100      12.8        33       174        97
VIS    2025250     91400   14.9500 -113.2600       8.3        99       176        91
VIS    2025250     91400   14.9400 -113.4300      10.6        35       161        99
VIS    2025250     91400   14.9400 -113.4400      11.2        36       161        98
VIS    2025250     91400   14.9400 -113.4800       9.4        40       161        93
VIS    2025250     91400   14.9400 -113.6000      12.0        35       160        99
VIS    2025250     91400   14.9400 -113.6100      11.9        35       160        99
VIS    2025250     91400   14.9300 -113.9100       8.6        25       164        96
VIS    2025250     91400   14.9400 -113.9300       9.2        18       167        97
VIS    2025250     91400   14.9000 -115.1000      20.5        42       178       100
VIS    2025250     91400   14.8700 -117.2400      19.9        47       180        97
VIS    2025250     91400   14.8600 -117.3500      19.8        44       180        93
VIS    2025250     91400   14.8500 -117.6500      21.0        48       178       100
VIS    2025250     91400   14.8500 -117.6800      20.6        47       178       100
VIS    2025250     91400   14.8400 -118.1800      20.7        47       176        99
VIS    2025250     91400   14.8400 -118.1900      20.5        44       176        96
VIS    2025250     91400   14.8400 -118.3500      22.8        51       171        98
VIS    2025250     91400   14.8000 -119.7300      14.8        32       190        99
VIS    2025250     91400   14.8100 -119.7600      15.1        33       189        96
VIS    2025250     91400   14.8100 -119.7700      15.3        34       187        94
VIS    2025250     91400   15.0400 -109.1000      11.2        48       178       100
VIS    2025250     91400   15.0200 -109.1200      10.3        39       178       100
VIS    2025250     91400   15.0300 -109.1300       9.2        33       178       100
VIS    2025250     91400   15.0400 -109.1900       8.7        52       182        97
VIS    2025250     91400   15.0300 -109.1900       9.0        54       182        98
VIS    2025250     91400   15.0300 -109.2500       9.4        48       181       100
VIS    2025250     91400   15.0200 -109.2800      10.0        44       187        90
VIS    2025250     91400   15.0200 -109.4200       5.3        31       194        97
VIS    2025250     91400   14.9500 -112.0900      11.1        11       186        99
VIS    2025250     91400   14.9600 -112.1800       6.8        26       188        97
VIS    2025250     91400   14.9600 -112.3600       4.1       231       191        97
VIS    2025250     91400   14.9200 -113.1000      13.7        33       175        91
VIS    2025250     91400   14.9400 -113.1300      13.6        31       174        92
VIS    2025250     91400   14.9200 -113.3000       8.1        96       176        97
VIS    2025250     91400   14.9200 -113.3000       8.1        95       176        96
VIS    2025250     91400   14.9200 -113.4300      10.1        35       161       100
VIS    2025250     91400   14.9200 -113.4400       8.8        32       161        97
VIS    2025250     91400   14.9300 -113.4800       9.0        39       161       100
VIS    2025250     91400   14.9300 -113.5000       8.2        43       161        91
VIS    2025250     91400   14.9100 -113.5400       9.3        36       158        95
VIS    2025250     91400   14.9300 -113.5700       9.9        35       160        95
VIS    2025250     91400   14.9200 -113.6000      11.9        33       160        98
VIS    2025250     91400   14.9300 -113.6100      11.9        34       161        98
VIS    2025250     91400   14.9100 -113.7600      17.3        36       159        99
VIS    2025250     91400   14.9000 -113.8500      10.4        26       161        94
VIS    2025250     91400   14.9200 -113.9100       8.7        26       165        95
VIS    2025250     91400   14.9200 -113.9200       8.3        25       165        99
VIS    2025250     91400   14.9000 -114.1400       4.9         9       191        97
VIS    2025250     91400   14.8900 -114.4700       9.5       227       186        95
VIS    2025250     91400   14.8300 -117.1900      16.2        47       184        99
VIS    2025250     91400   14.8400 -117.2300      20.6        48       180        93
VIS    2025250     91400   14.8400 -117.2300      20.6        48       180        93
VIS    2025250     91400   14.8400 -117.6500      21.1        47       178       100
VIS    2025250     91400   14.8300 -117.6700      20.8        47       178       100
VIS    2025250     91400   14.8200 -117.8300      22.0        25       175        98
VIS    2025250     91400   14.7800 -119.8000      17.5        29       181        97
VIS    2025250     91400   15.0000 -109.1000      10.7        45       175       100
VIS    2025250     91400   15.0200 -109.1100      10.6        42       176       100
VIS    2025250     91400   15.0200 -109.1600       7.7        48       179        94
VIS    2025250     91400   15.0200 -109.1700       7.6        54       180        90
VIS    2025250     91400   15.0000 -109.2100       8.7        49       179        99
VIS    2025250     91400   15.0000 -109.2600       9.3        45       178       100
VIS    2025250     91400   14.9900 -109.2800      10.2        15       180        97
VIS    2025250     91400   14.9900 -109.3000      10.6        12       185       100
VIS    2025250     91400   14.9000 -112.8300       4.9        40       191        95
VIS    2025250     91400   14.9100 -112.8600       4.4        41       191        91
VIS    2025250     91400   14.9100 -112.9900      11.4        34       179        94
VIS    2025250     91400   14.9100 -112.9900      11.4        34       179        94
VIS    2025250     91400   14.9000 -113.4300       9.0        36       161        92
VIS    2025250     91400   14.9100 -113.4400       8.4        33       161        96
VIS    2025250     91400   14.9000 -113.5000       9.1        36       159       100
VIS    2025250     91400   14.9000 -113.5100       9.9        36       159        95
VIS    2025250     91400   14.9100 -113.5400       9.3        36       158        95
VIS    2025250     91400   14.9000 -113.5800      10.4        30       160        95
VIS    2025250     91400   14.9100 -113.5800      10.1        30       160        98
VIS    2025250     91400   14.8900 -113.6200       7.9        20       163        93
VIS    2025250     91400   14.8900 -113.7500      17.3        36       159        95
VIS    2025250     91400   14.9000 -113.7500      17.7        35       159        99
VIS    2025250     91400   14.8800 -113.8300      10.9        18       162        94
VIS    2025250     91400   14.8800 -113.8400      10.8        18       162        94
VIS    2025250     91400   14.9000 -113.9000       8.5        27       165        96
VIS    2025250     91400   14.8800 -113.9300       7.7        25       176        99
VIS    2025250     91400   14.8900 -114.1300       5.8         8       191        98
VIS    2025250     91400   14.8500 -115.4900      26.2        12       176        96
VIS    2025250     91400   14.8100 -117.4800      10.5        39       182        90
VIS    2025250     91400   14.8000 -117.5500      18.4        38       180        92
VIS    2025250     91400   14.8000 -117.7300       8.6        32       180        90
VIS    2025250     91400   14.8100 -117.7900      22.0        26       174        97
VIS    2025250     91400   14.7900 -117.8300      20.7        25       173        98
VIS    2025250     91400   14.8000 -117.9400      19.9        42       176        98
VIS    2025250     91400   14.7900 -118.3200      17.2        22       170        97
VIS    2025250     91400   14.7800 -118.4300      21.8        56       172        97
VIS    2025250     91400   14.7700 -119.2800      16.6        38       172       100
VIS    2025250     91400   14.7700 -119.3000      16.9        40       171       100
VIS    2025250     91400   14.7600 -119.3300      17.7        44       171       100
VIS    2025250     91400   14.7700 -119.3500      18.4        47       172       100
VIS    2025250     91400   14.7700 -119.7300      15.0        25       189        99
VIS    2025250     91400   14.7600 -119.7600      18.5        26       178       100
VIS    2025250     91400   14.9800 -109.1400       9.8        46       171       100
VIS    2025250     91400   14.9800 -109.1500       9.8        46       171       100
VIS    2025250     91400   14.9800 -109.1900       9.1        46       170       100
VIS    2025250     91400   14.9700 -109.2300       9.0        41       178       100
VIS    2025250     91400   14.9800 -109.2500       9.2        34       179       100
VIS    2025250     91400   14.9900 -109.2600       9.4        33       180       100
VIS    2025250     91400   14.9700 -109.3000       9.8        18       184        93
VIS    2025250     91400   14.8900 -112.9900      11.5        35       178        93
VIS    2025250     91400   14.9000 -113.0000      11.5        35       178        93
VIS    2025250     91400   14.8700 -113.5200      10.2        21       157        97
VIS    2025250     91400   14.8700 -113.8300      10.9        18       162        98
VIS    2025250     91400   14.8800 -113.8500      10.8        18       162        95
VIS    2025250     91400   14.8600 -114.1200       8.2        11       185        99
VIS    2025250     91400   14.8600 -114.1200       7.5        10       186        99
VIS    2025250     91400   14.8700 -114.1500       6.2        21       189        99
VIS    2025250     91400   14.8300 -115.3500      21.7        29       174        98
VIS    2025250     91400   14.8000 -117.2600      10.5        13       181       100
VIS    2025250     91400   14.8000 -117.2600      10.5        13       181       100
VIS    2025250     91400   14.8000 -117.4600      10.1        42       182       100
VIS    2025250     91400   14.7800 -117.7500       8.0        33       176        90
VIS    2025250     91400   14.7900 -117.8400      22.2        22       173        96
VIS    2025250     91400   14.7800 -117.9300      20.2        43       176        98
VIS    2025250     91400   14.7800 -117.9300      20.3        43       176        98
VIS    2025250     91400   14.7800 -117.9600      20.0        44       176        98
VIS    2025250     91400   14.7800 -118.0000      21.3        27       183       100
VIS    2025250     91400   14.7700 -118.0100      21.3        27       183       100
VIS    2025250     91400   14.7700 -118.2800      15.4        17       171        92
VIS    2025250     91400   14.7700 -118.3100      16.4        21       171       100
VIS    2025250     91400   14.7600 -118.3300      16.9        23       173        99
VIS    2025250     91400   14.7800 -118.3600      21.4        27       171        98
VIS    2025250     91400   14.7700 -118.4200      21.7        56       172        97
VIS    2025250     91400   14.7500 -119.2600      17.1        38       170       100
VIS    2025250     91400   14.7400 -119.3000      17.5        43       167       100
VIS    2025250     91400   14.7500 -119.3000      17.3        42       171       100
VIS    2025250     91400   14.7500 -119.3500      18.1        46       172       100
VIS    2025250     91400   14.7300 -119.7200      18.7        25       175        95
VIS    2025250     91400   14.7300 -119.7400      18.8        26       175        95
VIS    2025250     91400   14.7500 -119.7900      20.3        26       176        90
VIS    2025250     91400   14.9700 -109.1300       9.8        46       172        99
VIS    2025250     91400   14.9700 -109.1600       9.9        44       171       100
VIS    2025250     91400   14.9500 -109.1900      10.0        37       169        99
VIS    2025250     91400   14.9700 -109.2300       8.9        41       178       100
VIS    2025250     91400   14.9700 -109.2400       8.9        41       178       100
VIS    2025250     91400   14.9500 -109.3800       5.5        84       190        92
VIS    2025250     91400   14.9400 -109.4800       6.0        59       193        99
VIS    2025250     91400   14.9400 -109.4800       6.0        60       193       100
VIS    2025250     91400   14.8800 -111.9100      12.0        33       191       100
VIS    2025250     91400   14.8900 -111.9200      12.4        32       189        99
VIS    2025250     91400   14.8500 -113.1900       5.6        36       177        91
VIS    2025250     91400   14.8600 -113.3800       7.8        47       162        91
VIS    2025250     91400   14.8600 -113.5000       8.0        16       157        91
VIS    2025250     91400   14.8500 -113.5300       9.0        14       160        98
VIS    2025250     91400   14.8300 -113.8400       9.9        17       163       100
VIS    2025250     91400   14.8300 -113.8600       9.8        16       164       100
VIS    2025250     91400   14.8400 -113.9000       9.9        14       166        91
VIS    2025250     91400   14.8300 -113.9100      10.2        13       172        94
VIS    2025250     91400   14.8300 -114.0900      10.6        13       182       100
VIS    2025250     91400   14.8400 -114.1000      10.0        12       184        99
VIS    2025250     91400   14.8400 -114.1200       8.8        15       185        99
VIS    2025250     91400   14.8100 -115.0100      19.4        33       172        98
VIS    2025250     91400   14.8000 -115.8700      18.3        56       176        98
VIS    2025250     91400   14.7900 -115.9000      18.2        46       178        99
VIS    2025250     91400   14.7800 -115.9400      20.6        36       186        99
VIS    2025250     91400   14.7600 -117.8400      17.9        30       174        94
VIS    2025250     91400   14.7500 -117.9100      20.7        44       176        99
VIS    2025250     91400   14.7400 -117.9500      21.1        43       173        94
VIS    2025250     91400   14.7600 -118.0200      22.7        25       185        90
VIS    2025250     91400   14.7500 -118.3000      14.5        18       173       100
VIS    2025250     91400   14.7400 -118.3400      20.4        31       173        99
VIS    2025250     91400   14.7400 -118.3600      21.0        32       179        99
VIS    2025250     91400   14.7500 -118.5200      17.7        31       185        92
VIS    2025250     91400   14.7300 -119.2500      16.7        39       168        96
VIS    2025250     91400   14.7300 -119.2500      16.4        38       169        95
VIS    2025250     91400   14.7300 -119.3000      18.0        45       164       100
VIS    2025250     91400   14.7300 -119.3100      17.9        44       164       100
VIS    2025250     91400   14.7400 -119.3400      18.6        41       172        90
VIS    2025250     91400   14.7100 -119.6700      21.0        28       175       100
VIS    2025250     91400   14.7100 -119.6700      21.0        28       177       100
VIS    2025250     91400   14.7200 -119.8000      20.9        26       169        91
VIS    2025250     91400   14.9400 -109.1400      10.4        43       169        99
VIS    2025250     91400   14.9200 -109.1700      10.6        38       167       100
VIS    2025250     91400   14.9400 -109.1900       9.9        35       169        98
VIS    2025250     91400   14.9200 -109.2200       8.3        35       170       100
VIS    2025250     91400   14.9300 -109.2700       6.9        34       178        99
VIS    2025250     91400   14.9200 -109.2900       6.9        26       181       100
VIS    2025250     91400   14.9300 -109.3600       4.6        95       190        90
VIS    2025250     91400   14.9200 -109.3800       4.6        79       184        96
VIS    2025250     91400   14.9200 -109.4100       4.4        48       188        97
VIS    2025250     91400   14.9300 -109.4200       4.7        44       189        97
VIS    2025250     91400   14.9200 -109.4700       5.3        56       190       100
VIS    2025250     91400   14.9400 -109.4800       5.9        60       193        99
VIS    2025250     91400   14.9100 -109.5200       5.7        57       193        99
VIS    2025250     91400   14.9100 -109.6300       6.6        53       193        99
VIS    2025250     91400   14.9100 -109.6400       6.9        48       194        97
VIS    2025250     91400   14.9300 -109.6800       7.0        33       194        99
VIS    2025250     91400   14.9100 -109.7400       7.6        69       194        96
VIS    2025250     91400   14.8600 -111.9000      11.7        35       192       100
VIS    2025250     91400   14.8500 -111.9400      12.1        32       192        98
VIS    2025250     91400   14.8500 -111.9600      12.3        31       190        96
VIS    2025250     91400   14.8400 -113.1200      15.7        43       176        95
VIS    2025250     91400   14.8400 -113.3800       7.7        44       159        96
VIS    2025250     91400   14.8100 -113.6200       8.5       352       158        99
VIS    2025250     91400   14.8200 -113.6400       8.4       351       158        98
VIS    2025250     91400   14.8100 -113.7100      14.4        26       154        99
VIS    2025250     91400   14.8100 -113.8200       8.8        19       163        97
VIS    2025250     91400   14.8300 -113.8500       9.4        18       164        98
VIS    2025250     91400   14.8200 -113.9100      10.5        13       172        99
VIS    2025250     91400   14.8200 -114.1200      11.8        20       179        97
VIS    2025250     91400   14.7800 -115.4500      21.2        14       168        90
VIS    2025250     91400   14.7800 -115.8800      18.4        51       175        97
VIS    2025250     91400   14.7800 -115.9000      18.3        44       178        99
VIS    2025250     91400   14.7300 -117.9400      21.3        42       178        97
VIS    2025250     91400   14.7200 -117.9800      21.6        36       178        99
VIS    2025250     91400   14.7200 -118.2500      19.5        46       183        91
VIS    2025250     91400   14.7300 -118.3300      19.7        38       176        98
VIS    2025250     91400   14.7300 -118.4900      24.8         8       174        96
VIS    2025250     91400   14.7200 -118.6100      16.0        44       168        99
VIS    2025250     91400   14.7100 -119.2000      20.4        35       172       100
VIS    2025250     91400   14.7100 -119.2300      20.2        32       169       100
VIS    2025250     91400   14.7000 -119.6600      20.7        26       175       100
VIS    2025250     91400   14.7000 -119.6700      20.9        26       175       100
VIS    2025250     91400   14.6800 -119.7600      19.8        29       171        96
VIS    2025250     91400   14.6900 -119.7900      20.0        28       170       100
VIS    2025250     91400   14.9000 -109.1500      10.6        41       167       100
VIS    2025250     91400   14.9000 -109.1600      10.5        40       166       100
VIS    2025250     91400   14.9000 -109.2000      10.1        37       165        99
VIS    2025250     91400   14.9000 -109.2400       7.8        28       173        99
VIS    2025250     91400   14.9000 -109.2500       7.5        27       174        99
VIS    2025250     91400   14.9200 -109.2900       6.7        26       181        99
VIS    2025250     91400   14.9000 -109.3500       6.2        79       182        99
VIS    2025250     91400   14.8900 -109.4400       5.0        56       183       100
VIS    2025250     91400   14.9100 -109.4600       5.0        55       189        99
VIS    2025250     91400   14.9000 -109.6300       7.4        53       193       100
VIS    2025250     91400   14.9100 -109.6400       6.8        51       194        98
VIS    2025250     91400   14.9000 -109.7000       6.3        59       194        98
VIS    2025250     91400   14.8400 -111.9200      11.6        35       192        99
VIS    2025250     91400   14.8400 -111.9300      11.7        35       192        99
VIS    2025250     91400   14.7900 -113.6000       8.2       348       159        90
VIS    2025250     91400   14.7900 -113.6100       8.1       349       159        97
VIS    2025250     91400   14.8100 -113.6300       8.4       352       157        98
VIS    2025250     91400   14.8000 -113.7100      13.6        29       153       100
VIS    2025250     91400   14.8000 -113.8300       8.9        19       164        99
VIS    2025250     91400   14.7500 -115.3800      26.3        10       169       100
VIS    2025250     91400   14.7500 -115.9100      18.7        33       178        91
VIS    2025250     91400   14.7100 -117.9400      25.2        30       181        92
VIS    2025250     91400   14.6900 -118.3300      15.4        41       176        99
VIS    2025250     91400   14.7000 -118.3500      19.0        36       178        96
VIS    2025250     91400   14.6900 -118.5700      23.2        45       180        91
VIS    2025250     91400   14.6900 -118.6500      21.6        36       165        99
VIS    2025250     91400   14.6800 -118.6700      21.4        35       169        97
VIS    2025250     91400   14.6800 -119.1700      19.9        39       170        98
VIS    2025250     91400   14.6800 -119.1900      18.7        37       170        96
VIS    2025250     91400   14.6700 -119.3000      18.0        33       162        99
VIS    2025250     91400   14.6800 -119.3100      18.5        34       167        94
VIS    2025250     91400   14.6700 -119.6800      20.8        27       175        99
VIS    2025250     91400   14.6700 -119.7400      19.5        31       172        95
VIS    2025250     91400   14.6600 -119.7900      19.9        29       171        99
VIS    2025250     91400   14.6600 -119.8100      20.0        27       170       100
VIS    2025250     91400   14.8900 -109.1300      11.2        44       166       100
VIS    2025250     91400   14.8900 -109.1600      10.5        40       166       100
VIS    2025250     91400   14.8800 -109.2000      10.1        36       165        98
VIS    2025250     91400   14.8800 -109.2500       8.1        29       174        99
VIS    2025250     91400   14.8800 -109.2500       7.8        27       175        99
VIS    2025250     91400   14.8700 -109.2900       6.7        31       178       100
VIS    2025250     91400   14.8800 -109.3300       7.9        73       180       100
VIS    2025250     91400   14.8700 -109.3500       8.1        72       179        98
VIS    2025250     91400   14.8900 -109.4400       5.2        56       183        99
VIS    2025250     91400   14.8800 -109.4700       5.5        51       184        98
VIS    2025250     91400   14.8800 -109.4900       5.6        44       185        98
VIS    2025250     91400   14.8800 -109.6400       7.5        50       193       100
VIS    2025250     91400   14.8800 -109.6400       7.8        50       193       100
VIS    2025250     91400   14.8200 -111.8600      10.4        40       192        99
VIS    2025250     91400   14.8100 -112.0400       4.2       243       192        90
VIS    2025250     91400   14.7700 -113.4500      14.6        51       158        91
VIS    2025250     91400   14.7900 -113.5100       8.2        21       158        95
VIS    2025250     91400   14.7900 -113.5200       8.2        21       158        95
VIS    2025250     91400   14.7600 -113.7100      13.2        30       153       100
VIS    2025250     91400   14.7800 -113.7400      13.6        29       154       100
VIS    2025250     91400   14.7600 -113.8500      10.6        10       164        91
VIS    2025250     91400   14.7400 -115.4000      23.1        23       175       100
VIS    2025250     91400   14.6700 -117.8900      24.5        23       181        91
VIS    2025250     91400   14.6800 -118.3300      14.7        40       176        96
VIS    2025250     91400   14.6700 -118.5700      22.7        44       186        93
VIS    2025250     91400   14.6500 -119.1400      24.0        38       172        99
VIS    2025250     91400   14.6600 -119.1700      20.9        36       172       100
VIS    2025250     91400   14.6400 -119.2600      19.2        36       164        98
VIS    2025250     91400   14.6500 -119.2600      19.0        36       164        99
VIS    2025250     91400   14.6500 -119.2900      19.3        36       164        99
VIS    2025250     91400   14.6500 -119.6500      21.8        25       182        92
VIS    2025250     91400   14.6600 -119.7400      26.3        27       175        99
VIS    2025250     91400   14.6400 -119.7700      20.0        32       173       100
VIS    2025250     91400   14.6500 -119.8000      21.2        26       170        92
VIS    2025250     91400   14.8700 -109.1400      11.5        44       166       100
VIS    2025250     91400   14.8600 -109.1900      10.5        38       166        97
VIS    2025250     91400   14.8500 -109.2200       9.4        33       168        98
VIS    2025250     91400   14.8600 -109.2300       8.6        30       169        99
VIS    2025250     91400   14.8600 -109.2700       7.1        27       175       100
VIS    2025250     91400   14.8700 -109.2900       6.6        31       178       100
VIS    2025250     91400   14.8700 -109.3400       8.5        69       179        99
VIS    2025250     91400   14.8400 -109.4300       7.1        47       174        96
VIS    2025250     91400   14.8600 -109.4400       5.5        54       180        95
VIS    2025250     91400   14.8500 -109.4900       5.1        56       184        96
VIS    2025250     91400   14.8600 -109.5000       5.3        51       185        93
VIS    2025250     91400   14.7500 -113.3000      10.0        47       163       100
VIS    2025250     91400   14.7600 -113.4400      15.2        52       158        92
VIS    2025250     91400   14.7600 -113.4900       8.1        20       158       100
VIS    2025250     91400   14.7600 -113.5200       8.0        21       158        98
VIS    2025250     91400   14.7400 -113.5700      11.8        17       154        97
VIS    2025250     91400   14.7400 -113.6200       8.9        17       153        96
VIS    2025250     91400   14.7600 -113.7100      13.2        30       153        99
VIS    2025250     91400   14.7500 -113.7400      13.6        28       155        98
VIS    2025250     91400   14.7600 -113.7600      13.2        27       155        99
VIS    2025250     91400   14.7200 -115.3400      20.3        16       167        95
VIS    2025250     91400   14.7100 -115.4200      23.7        20       175       100
VIS    2025250     91400   14.7000 -115.4500      22.3        17       178       100
VIS    2025250     91400   14.7100 -115.4700      23.4        16       176       100
VIS    2025250     91400   14.6500 -117.5300       8.9        35       186        91
VIS    2025250     91400   14.6500 -118.0000      19.3        43       182        93
VIS    2025250     91400   14.6400 -118.4300      10.4        38       178        99
VIS    2025250     91400   14.6500 -118.4600      11.1        39       180        98
VIS    2025250     91400   14.6300 -118.5200       9.9        38       180        99
VIS    2025250     91400   14.6400 -118.5300       9.7        39       180        99
VIS    2025250     91400   14.6200 -119.2300      20.8        30       168       100
VIS    2025250     91400   14.6400 -119.2600      20.8        32       164        96
VIS    2025250     91400   14.6300 -119.7600      22.0        27       171        93
VIS    2025250     91400   14.6100 -119.7900      19.9        31       172       100
VIS    2025250     91400   14.8400 -109.1400      11.5        42       172        99
VIS    2025250     91400   14.8400 -109.1800      11.0        41       168        99
VIS    2025250     91400   14.8400 -109.2100       9.9        37       168        98
VIS    2025250     91400   14.8300 -109.2500       8.4        31       174       100
VIS    2025250     91400   14.8400 -109.2600       8.2        30       174       100
VIS    2025250     91400   14.8400 -109.3800      10.6        40       178        99
VIS    2025250     91400   14.8400 -109.4200       7.6        44       174        95
VIS    2025250     91400   14.8300 -109.4700       5.4        55       183        99
VIS    2025250     91400   14.8200 -109.4900       5.4        54       183        98
VIS    2025250     91400   14.8200 -109.5100       5.2        53       188        94
VIS    2025250     91400   14.7200 -113.2400      12.7        54       162        99
VIS    2025250     91400   14.7300 -113.2900      10.0        49       164       100
VIS    2025250     91400   14.7200 -113.3200       9.9        38       163       100
VIS    2025250     91400   14.7400 -113.5800      12.5        26       154        92
VIS    2025250     91400   14.7200 -113.6200       9.7        19       153        95
VIS    2025250     91400   14.7200 -113.6400       9.1        19       153        93
VIS    2025250     91400   14.6900 -115.3100      21.0        16       168       100
VIS    2025250     91400   14.6900 -115.4000      22.9        22       174       100
VIS    2025250     91400   14.6700 -115.4200      21.3        21       175        99
VIS    2025250     91400   14.6900 -115.4500      22.2        17       180       100
VIS    2025250     91400   14.6600 -115.9000      21.8        36       186       100
VIS    2025250     91400   14.6500 -117.4400      10.1        47       191        99
VIS    2025250     91400   14.6300 -117.4500       8.9        57       191        98
VIS    2025250     91400   14.6500 -117.4900      11.9        33       191        98
VIS    2025250     91400   14.6300 -117.5200       9.2        42       191        94
VIS    2025250     91400   14.6500 -117.5300      10.4        31       186        92
VIS    2025250     91400   14.6300 -117.9600      21.4        44       181        94
VIS    2025250     91400   14.6400 -117.9800      20.8        45       181        93
VIS    2025250     91400   14.6200 -118.4500      10.8        41       181       100
VIS    2025250     91400   14.6200 -118.4500      10.8        41       181       100
VIS    2025250     91400   14.6200 -119.1700      22.3        31       164        94
VIS    2025250     91400   14.6000 -119.2100      20.6        29       164        99
VIS    2025250     91400   14.6000 -119.2300      20.9        28       167       100
VIS    2025250     91400   14.6200 -119.2500      22.5        28       167        97
VIS    2025250     91400   14.6000 -119.7600      20.1        30       179       100
VIS    2025250     91400   14.8100 -109.1400      10.9        40       175        98
VIS    2025250     91400   14.8200 -109.1500      11.1        41       174        99
VIS    2025250     91400   14.8200 -109.1900      10.5        41       172       100
VIS    2025250     91400   14.8100 -109.2300       9.1        39       176       100
VIS    2025250     91400   14.8100 -109.2400       8.7        36       176       100
VIS    2025250     91400   14.8200 -109.2900       9.1        37       176       100
VIS    2025250     91400   14.8100 -109.4600       6.2        50       176        99
VIS    2025250     91400   14.7900 -109.4800       6.5        48       183       100
VIS    2025250     91400   14.8100 -109.5100       5.5        53       185        98
VIS    2025250     91400   14.7900 -109.5400       6.8        40       190        94
VIS    2025250     91400   14.7200 -112.8000       5.2        52       177        98
VIS    2025250     91400   14.7200 -113.2300      12.7        54       162        99
VIS    2025250     91400   14.7100 -113.3300       9.9        35       162        94
VIS    2025250     91400   14.7000 -113.3400      10.1        36       162        94
VIS    2025250     91400   14.7000 -113.5800      11.3        31       153        99
VIS    2025250     91400   14.7100 -113.5900      11.7        33       153        99
VIS    2025250     91400   14.6900 -113.6700       8.9         9       153        98
VIS    2025250     91400   14.6900 -113.7100      12.9        29       158       100
VIS    2025250     91400   14.7000 -113.7300      13.0        28       159        99
VIS    2025250     91400   14.6600 -115.0600      26.3        19       171        97
VIS    2025250     91400   14.6700 -115.0700      26.3        19       171        99
VIS    2025250     91400   14.6600 -115.8500      15.5        25       186        97
VIS    2025250     91400   14.6500 -115.8600      15.6        25       189        99
VIS    2025250     91400   14.6600 -115.9000      21.6        35       186       100
VIS    2025250     91400   14.6200 -117.4500       9.0        55       191       100
VIS    2025250     91400   14.6100 -117.4800      11.6        39       192        91
VIS    2025250     91400   14.6100 -117.5700      17.6        31       191        92
VIS    2025250     91400   14.5800 -119.2100      20.2        30       165        99
VIS    2025250     91400   14.5800 -119.2200      19.4        28       166       100
VIS    2025250     91400   14.5900 -119.2600      21.1        29       170       100
VIS    2025250     91400   14.5700 -119.2800      22.4        29       171       100
VIS    2025250     91400   14.7900 -109.1300      10.5        43       173        99
VIS    2025250     91400   14.8000 -109.1600      10.4        41       177        99
VIS    2025250     91400   14.7900 -109.2100      10.2        42       177       100
VIS    2025250     91400   14.7800 -109.2300      10.2        42       177       100
VIS    2025250     91400   14.7700 -109.2600       9.2        39       178       100
VIS    2025250     91400   14.7900 -109.3500       5.9        50       184        97
VIS    2025250     91400   14.7900 -109.3600       6.3        52       184        95
VIS    2025250     91400   14.7900 -109.4200       7.3        50       181        92
VIS    2025250     91400   14.7800 -109.4500       7.5        49       180        95
VIS    2025250     91400   14.7800 -109.4600       7.4        50       184        99
VIS    2025250     91400   14.7700 -109.4900       6.6        47       180        99
VIS    2025250     91400   14.7700 -109.5300       6.2        43       189        99
VIS    2025250     91400   14.7800 -109.5700       6.9        41       194        99
VIS    2025250     91400   14.6800 -113.1100       5.2        39       172        95
VIS    2025250     91400   14.6800 -113.1200       5.0        39       171        99
VIS    2025250     91400   14.6700 -113.2700      15.0        45       162       100
VIS    2025250     91400   14.6900 -113.3200      10.5        36       162        90
VIS    2025250     91400   14.6700 -113.5100       9.5         7       158        91
VIS    2025250     91400   14.6700 -113.5600      17.5        34       152        97
VIS    2025250     91400   14.6700 -113.5700      17.6        34       152        97
VIS    2025250     91400   14.6700 -113.7300      12.8        29       161       100
VIS    2025250     91400   14.6300 -115.3000      15.8        19       174        90
VIS    2025250     91400   14.6400 -115.3300      16.0        21       176        98
VIS    2025250     91400   14.6300 -115.8500      15.3        28       190        98
VIS    2025250     91400   14.6300 -115.8700      16.3        29       190       100
VIS    2025250     91400   14.5800 -117.4700      13.0        37       188        98
VIS    2025250     91400   14.6000 -117.4800      12.8        38       191        96
VIS    2025250     91400   14.5600 -119.1300      24.8        41       166        99
VIS    2025250     91400   14.5600 -119.1600      24.9        41       166       100
VIS    2025250     91400   14.5600 -119.2600      20.9        29       170        99
VIS    2025250     91400   14.7600 -109.1500      10.5        46       176        99
VIS    2025250     91400   14.7500 -109.1800      10.3        46       178       100
VIS    2025250     91400   14.7500 -109.2000      10.5        46       179       100
VIS    2025250     91400   14.7700 -109.2200      10.4        43       177       100
VIS    2025250     91400   14.7700 -109.2500      10.2        42       178        99
VIS    2025250     91400   14.7700 -109.3200       5.0        45       183        98
VIS    2025250     91400   14.7500 -109.4200       8.2        52       184       100
VIS    2025250     91400   14.7600 -109.4300       7.3        55       183        98
VIS    2025250     91400   14.7600 -109.4800       7.2        45       180        99
VIS    2025250     91400   14.7600 -109.5000       6.9        45       185        99
VIS    2025250     91400   14.7500 -109.5400       7.3        43       189        99
VIS    2025250     91400   14.7500 -109.5500       6.7        44       190        95
VIS    2025250     91400   14.6800 -112.6400      22.3        48       186        99
VIS    2025250     91400   14.6700 -113.1200       5.1        38       170        98
VIS    2025250     91400   14.6500 -113.3100      10.6        41       162        99
VIS    2025250     91400   14.6500 -113.3200      10.4        41       162        98
VIS    2025250     91400   14.6700 -113.3400      10.3        39       162        92
VIS    2025250     91400   14.6500 -113.4800      10.2         8       158        94
VIS    2025250     91400   14.6600 -113.5600      17.5        34       152        96
VIS    2025250     91400   14.5700 -117.4600      13.4        38       189        99
VIS    2025250     91400   14.5700 -117.5000      13.9        38       185        99
VIS    2025250     91400   14.5300 -119.1400      23.4        39       171        97
VIS    2025250     91400   14.5300 -119.3000      24.2        33       171        93
VIS    2025250     91400   14.7400 -109.1600      10.4        49       178       100
VIS    2025250     91400   14.7400 -109.1600      10.4        48       178       100
VIS    2025250     91400   14.7500 -109.1900      10.5        47       178       100
VIS    2025250     91400   14.7500 -109.2400      10.9        42       179       100
VIS    2025250     91400   14.7300 -109.2700       7.1        58       181        97
VIS    2025250     91400   14.7200 -109.3600       9.9        47       179        96
VIS    2025250     91400   14.7200 -109.4000       8.9        46       179        97
VIS    2025250     91400   14.7400 -109.4200       8.9        49       183        97
VIS    2025250     91400   14.7300 -109.4400       8.4        48       182        99
VIS    2025250     91400   14.7200 -109.4900       7.3        42       183        99
VIS    2025250     91400   14.7200 -109.5100       7.9        45       184       100
VIS    2025250     91400   14.7300 -109.5300       8.0        43       187        99
VIS    2025250     91400   14.6500 -112.6500      22.5        45       185        92
VIS    2025250     91400   14.6400 -112.9500       8.4        60       169        93
VIS    2025250     91400   14.6300 -113.5000      12.4         9       155       100
VIS    2025250     91400   14.6200 -113.6000      12.9        32       152        99
VIS    2025250     91400   14.5900 -115.4100      17.7        18       172       100
VIS    2025250     91400   14.5600 -117.3800      13.8        21       187        93
VIS    2025250     91400   14.5300 -117.7900      11.5        33       184        99
VIS    2025250     91400   14.5500 -117.8800      26.1        47       185        90
VIS    2025250     91400   14.5100 -118.9100      22.0        30       179       100
VIS    2025250     91400   14.5200 -118.9400      22.6        26       178        94
VIS    2025250     91400   14.5200 -119.3000      23.5        42       170        99
VIS    2025250     91400   14.5000 -119.4700      18.2        20       178        95
VIS    2025250     91400   14.7200 -109.2700       7.0        60       181        98
VIS    2025250     91400   14.7000 -109.3600       8.8        44       181        97
VIS    2025250     91400   14.7000 -109.3800       8.6        45       181        94
VIS    2025250     91400   14.7000 -109.4300       8.6        45       181        96
VIS    2025250     91400   14.7000 -109.4400       8.3        45       181        94
VIS    2025250     91400   14.7100 -109.5200       8.1        45       186       100
VIS    2025250     91400   14.7100 -109.5600       9.2        45       192        90
VIS    2025250     91400   14.6400 -112.6200      22.8        44       184        91
VIS    2025250     91400   14.6400 -112.6400      22.8        44       184        91
VIS    2025250     91400   14.6300 -113.0700       9.6        45       171        97
VIS    2025250     91400   14.6100 -113.1200       8.1        47       166        97
VIS    2025250     91400   14.6100 -113.1300       8.9        47       166        91
VIS    2025250     91400   14.6000 -113.2800       8.3        28       163        93
VIS    2025250     91400   14.6200 -113.2900       8.5        27       162        96
VIS    2025250     91400   14.5900 -113.5700      14.7        33       152        90
VIS    2025250     91400   14.6000 -113.5900      13.5        32       152        99
VIS    2025250     91400   14.6100 -113.6000      13.0        32       152        99
VIS    2025250     91400   14.6100 -113.6400      13.1        28       153        98
VIS    2025250     91400   14.5600 -115.2500      22.6        25       169       100
VIS    2025250     91400   14.5800 -115.2700      22.9        25       168       100
VIS    2025250     91400   14.5700 -115.3900      18.1        20       171        99
VIS    2025250     91400   14.5100 -117.9900      25.1        46       176        93
VIS    2025250     91400   14.5100 -117.9900      25.1        46       176        94
VIS    2025250     91400   14.5000 -118.9500      22.9        27       179        94
VIS    2025250     91400   14.6800 -109.2300       9.6        43       178        94
VIS    2025250     91400   14.6900 -109.3000       7.5        34       174        92
VIS    2025250     91400   14.6800 -109.3400       6.6        34       178        98
VIS    2025250     91400   14.6900 -109.3500       7.5        39       181        97
VIS    2025250     91400   14.6900 -109.4000       7.6        47       181        97
VIS    2025250     91400   14.6900 -109.4200       7.3        45       181        98
VIS    2025250     91400   14.6900 -109.4800       8.8        46       186        99
VIS    2025250     91400   14.5800 -113.1200       5.1        43       166        93
VIS    2025250     91400   14.5800 -113.2300       9.1        33       161        99
VIS    2025250     91400   14.5800 -113.2700       9.2        32       162        99
VIS    2025250     91400   14.5800 -113.2700       9.2        31       162        99
VIS    2025250     91400   14.5900 -113.6100      13.9        35       152        99
VIS    2025250     91400   14.5800 -113.6600      12.5        32       157       100
VIS    2025250     91400   14.5600 -114.7800      15.5        22       179       100
VIS    2025250     91400   14.5400 -114.9900      21.4        26       174        98
VIS    2025250     91400   14.5200 -115.7600      21.1        55       185        98
VIS    2025250     91400   14.5400 -115.7700      20.4        54       186        96
VIS    2025250     91400   14.4800 -117.7700       7.2        84       188        99
VIS    2025250     91400   14.4800 -117.7800       7.2        83       188        99
VIS    2025250     91400   14.4600 -118.9100      22.4        37       178       100
VIS    2025250     91400   14.6600 -109.2600      11.1        45       174        92
VIS    2025250     91400   14.6700 -109.3400       6.1        33       178        98
VIS    2025250     91400   14.6500 -109.3600       6.3        42       179        93
VIS    2025250     91400   14.6600 -109.3900       7.7        49       182        98
VIS    2025250     91400   14.6700 -109.4300       7.5        46       184        96
VIS    2025250     91400   14.6500 -109.5000       7.5        50       191        94
VIS    2025250     91400   14.5700 -113.2300       9.0        33       161        98
VIS    2025250     91400   14.5600 -113.2600       9.5        34       161       100
VIS    2025250     91400   14.5600 -113.2900       9.6        33       161        99
VIS    2025250     91400   14.5700 -113.3700      13.2        27       157        92
VIS    2025250     91400   14.5500 -113.6300      11.3        37       154        91
VIS    2025250     91400   14.5500 -113.6900      14.8        28       169        99
VIS    2025250     91400   14.5200 -115.7600      21.0        56       183        97
VIS    2025250     91400   14.5200 -115.7700      21.3        54       185        98
VIS    2025250     91400   14.4700 -117.3700      11.5        12       188        99
VIS    2025250     91400   14.4600 -117.3900      11.9        11       188        99
VIS    2025250     91400   14.4800 -117.6000      23.2        47       189        95
VIS    2025250     91400   14.4700 -117.7900       7.1        87       188        98
VIS    2025250     91400   14.4400 -118.9300      21.7        36       179       100
VIS    2025250     91400   14.6300 -109.2500      10.4        43       176        99
VIS    2025250     91400   14.6300 -109.2800       8.9        36       176        99
VIS    2025250     91400   14.6400 -109.3000       6.4        30       177        99
VIS    2025250     91400   14.6500 -109.3500       6.2        39       177        99
VIS    2025250     91400   14.6400 -109.3600       6.5        42       178        99
VIS    2025250     91400   14.6300 -109.4000       7.5        49       182       100
VIS    2025250     91400   14.6200 -109.4200       6.9        45       181        94
VIS    2025250     91400   14.6300 -109.4800       6.7        46       188        96
VIS    2025250     91400   14.6200 -109.4800       6.7        48       189        97
VIS    2025250     91400   14.5500 -112.9500       7.0        57       163        99
VIS    2025250     91400   14.5300 -113.0600      10.4        50       163        94
VIS    2025250     91400   14.5500 -113.0900      12.6        46       163        98
VIS    2025250     91400   14.5500 -113.1500       5.8        24       163        95
VIS    2025250     91400   14.5500 -113.2100       8.8        35       161        98
VIS    2025250     91400   14.5300 -113.2200       8.9        36       159        99
VIS    2025250     91400   14.5400 -113.2700       8.6        29       160        91
VIS    2025250     91400   14.5300 -113.6100      10.8        39       154        93
VIS    2025250     91400   14.4900 -115.7800      22.4        58       183        99
VIS    2025250     91400   14.4400 -117.4400       9.7        38       187        94
VIS    2025250     91400   14.4400 -117.4400       9.9        38       185        95
VIS    2025250     91400   14.6200 -109.2700       9.9        40       176        99
VIS    2025250     91400   14.6200 -109.2800       8.9        36       176        99
VIS    2025250     91400   14.6000 -109.4200       7.0        45       184        95
VIS    2025250     91400   14.6000 -109.4400       6.8        47       185        94
VIS    2025250     91400   14.6100 -109.4600       6.3        46       186        96
VIS    2025250     91400   14.5200 -112.9400       6.8        58       163        99
VIS    2025250     91400   14.5200 -112.9400       6.6        57       163        98
VIS    2025250     91400   14.5300 -113.0600       9.9        52       163        90
VIS    2025250     91400   14.5200 -113.1900      10.7        36       158        96
VIS    2025250     91400   14.5100 -113.2200      11.0        36       158        90
VIS    2025250     91400   14.5100 -113.2300      10.1        35       158        95
VIS    2025250     91400   14.5000 -113.5200       9.6        22       149        97
VIS    2025250     91400   14.5100 -113.6700      16.5        32       168        99
VIS    2025250     91400   14.5100 -114.0800       8.0       200       189        93
VIS    2025250     91400   14.5000 -114.1100       7.7       194       189        99
VIS    2025250     91400   14.4900 -114.3700       6.7        30       177        91
VIS    2025250     91400   14.4600 -115.2200      15.1        27       161        91
VIS    2025250     91400   14.4700 -115.2500      14.8        26       160        98
VIS    2025250     91400   14.4600 -115.2900      16.5        21       166        97
VIS    2025250     91400   14.4300 -117.4400       9.4        36       187        97
VIS    2025250     91400   14.5900 -109.2300       9.4        47       176        98
VIS    2025250     91400   14.6000 -109.2500       9.4        45       176       100
VIS    2025250     91400   14.6000 -109.3400       8.7        41       178        91
VIS    2025250     91400   14.5900 -109.4300       6.8        47       185        93
VIS    2025250     91400   14.5100 -112.9400       6.5        56       163        95
VIS    2025250     91400   14.4900 -112.9600       5.1        46       160        94
VIS    2025250     91400   14.4900 -112.9800       4.9        47       160        97
VIS    2025250     91400   14.4800 -113.1400      14.4        48       157        99
VIS    2025250     91400   14.4900 -113.1600      13.0        45       157        99
VIS    2025250     91400   14.5000 -113.1700      11.8        40       157        98
VIS    2025250     91400   14.5000 -113.2100      10.7        35       157        99
VIS    2025250     91400   14.4900 -113.2500       8.2        26       156        99
VIS    2025250     91400   14.5000 -113.2600       8.2        26       156        97
VIS    2025250     91400   14.4800 -113.3400      12.7        32       152       100
VIS    2025250     91400   14.4800 -113.3600      12.9        31       152        99
VIS    2025250     91400   14.4800 -113.3700      13.0        30       150       100
VIS    2025250     91400   14.4800 -113.4200      12.8        30       151        98
VIS    2025250     91400   14.4900 -113.4300      12.5        28       151        94
VIS    2025250     91400   14.4800 -113.4800      10.6        17       149        97
VIS    2025250     91400   14.4900 -113.4900      10.0        16       149        98
VIS    2025250     91400   14.4900 -113.5100       9.6        20       149        99
VIS    2025250     91400   14.4800 -113.5900      18.7        31       157        98
VIS    2025250     91400   14.4800 -113.6100      18.7        31       157        99
VIS    2025250     91400   14.4600 -114.1900      10.0         9       182        98
VIS    2025250     91400   14.4800 -114.3100       4.4        38       177        90
VIS    2025250     91400   14.4600 -114.3300       5.8        34       176        97
VIS    2025250     91400   14.4800 -114.3500       5.7        33       177        96
VIS    2025250     91400   14.4700 -114.3800       6.6        28       179        90
VIS    2025250     91400   14.4600 -115.2100      15.0        27       161        92
VIS    2025250     91400   14.4400 -115.2400      16.0        23       164        95
VIS    2025250     91400   14.4400 -115.2700      16.5        21       166       100
VIS    2025250     91400   14.4300 -115.6800      23.4        55       177        98
VIS    2025250     91400   14.4200 -115.7900      13.8        47       181        94
VIS    2025250     91400   14.3700 -119.1900      20.9        35       172        98
VIS    2025250     91400   14.5600 -109.2400       9.8        43       176        98
VIS    2025250     91400   14.5600 -109.2800       9.7        42       183       100
VIS    2025250     91400   14.4900 -112.5000       4.7       102       181        94
VIS    2025250     91400   14.4800 -112.9400       4.9        36       160        94
VIS    2025250     91400   14.4800 -113.0900       9.6        39       157       100
VIS    2025250     91400   14.4800 -113.1400      14.4        48       157        99
VIS    2025250     91400   14.4600 -113.1600      14.0        48       157        99
VIS    2025250     91400   14.4600 -113.3600      13.6        28       150       100
VIS    2025250     91400   14.4700 -113.3700      13.6        31       150        99
VIS    2025250     91400   14.4700 -113.4200      12.9        30       151        99
VIS    2025250     91400   14.4700 -113.4300      12.7        29       151        97
VIS    2025250     91400   14.4600 -113.4700      11.5        18       149        99
VIS    2025250     91400   14.4500 -113.4900      11.8        18       149        96
VIS    2025250     91400   14.4700 -113.5900      19.1        30       157        98
VIS    2025250     91400   14.4600 -113.6200      19.4        29       171        98
VIS    2025250     91400   14.4600 -113.6300      19.5        29       172        98
VIS    2025250     91400   14.4600 -114.1500       8.7       194       189        97
VIS    2025250     91400   14.4400 -114.1800      10.2        13       175       100
VIS    2025250     91400   14.4500 -114.1900      10.1        12       178        99
VIS    2025250     91400   14.4300 -114.2200       8.8        15       178       100
VIS    2025250     91400   14.4300 -114.2500       6.6        16       179        92
VIS    2025250     91400   14.4300 -114.2900       5.2        40       175        99
VIS    2025250     91400   14.4400 -114.3000       4.5        30       177        93
VIS    2025250     91400   14.4500 -114.3400       5.9        33       176        96
VIS    2025250     91400   14.4300 -114.3800       6.6         5       189        98
VIS    2025250     91400   14.4200 -115.2300      18.0        18       165        92
VIS    2025250     91400   14.4300 -115.2500      17.4        20       165        93
VIS    2025250     91400   14.4300 -115.2600      17.5        19       166        95
VIS    2025250     91400   14.4100 -115.7000      22.0        52       176       100
VIS    2025250     91400   14.4100 -115.7000      21.0        50       175        97
VIS    2025250     91400   14.4100 -115.7400      21.1        44       177       100
VIS    2025250     91400   14.3300 -119.4500      13.3        44       181        90
VIS    2025250     91400   14.5400 -109.2500      10.1        46       179       100
VIS    2025250     91400   14.5300 -109.2700       9.8        45       184       100
VIS    2025250     91400   14.5500 -109.3100       9.0        42       190        90
VIS    2025250     91400   14.5400 -109.3300       6.1        46       192        97
VIS    2025250     91400   14.4700 -112.5000       4.5        98       180        98
VIS    2025250     91400   14.4600 -112.7600      11.4        58       166        98
VIS    2025250     91400   14.4400 -113.0300      15.5        48       155        97
VIS    2025250     91400   14.4500 -113.1200      14.0        53       157        98
VIS    2025250     91400   14.4500 -113.1200      14.1        52       157        99
VIS    2025250     91400   14.4500 -113.1500      14.1        50       157       100
VIS    2025250     91400   14.4300 -113.3400      15.9        28       148       100
VIS    2025250     91400   14.4300 -113.3700      14.8        26       150        99
VIS    2025250     91400   14.4400 -113.3800      14.0        26       150        99
VIS    2025250     91400   14.4400 -113.4200      14.1        29       150        97
VIS    2025250     91400   14.4500 -113.4800      12.2        18       149        93
VIS    2025250     91400   14.4500 -113.4900      12.1        18       149        94
VIS    2025250     91400   14.4300 -113.5800      18.0        30       156        99
VIS    2025250     91400   14.4300 -114.1800       9.9        14       175       100
VIS    2025250     91400   14.4200 -114.2000       9.0        17       176       100
VIS    2025250     91400   14.4300 -114.2300       8.5        17       178       100
VIS    2025250     91400   14.4300 -114.2600       7.2        19       178        96
VIS    2025250     91400   14.4100 -114.2800       7.4        29       175        91
VIS    2025250     91400   14.4300 -114.3400       6.9        26       175        98
VIS    2025250     91400   14.4300 -114.3700       7.4         7       183        98
VIS    2025250     91400   14.4000 -114.7200      17.4        20       174        95
VIS    2025250     91400   14.3800 -115.6500      22.2        55       176        98
VIS    2025250     91400   14.3900 -115.6700      22.6        54       178        99
VIS    2025250     91400   14.3800 -115.6900      22.0        54       176        98
VIS    2025250     91400   14.3900 -115.7200      21.8        49       177       100
VIS    2025250     91400   14.3100 -119.7000      21.7        47       167        99
VIS    2025250     91400   14.5200 -109.2400       8.9        50       179       100
VIS    2025250     91400   14.5300 -109.2600       9.9        47       183        99
VIS    2025250     91400   14.5200 -109.3000      10.3        44       187       100
VIS    2025250     91400   14.4400 -112.5100       4.1        85       179        92
VIS    2025250     91400   14.4300 -112.7600      10.1        55       165        93
VIS    2025250     91400   14.4300 -113.0400      15.6        48       155        99
VIS    2025250     91400   14.4300 -113.0500      15.7        49       157        98
VIS    2025250     91400   14.4300 -113.1600      16.1        43       157        98
VIS    2025250     91400   14.4200 -113.3100      16.1        28       147        96
VIS    2025250     91400   14.4200 -113.3800      14.6        26       150       100
VIS    2025250     91400   14.4200 -113.5000      17.3        16       146        96
VIS    2025250     91400   14.4000 -114.2200       9.8        20       177        98
VIS    2025250     91400   14.4000 -114.3400      11.8        11       175        95
VIS    2025250     91400   14.2900 -119.7100      22.0        48       167        98
OIR    2025250     91400   24.2300 -110.8700      32.1       121       134        60
OIR    2025250     91400   24.2300 -110.8800      26.3       119       116        60
OIR    2025250     91400   24.2300 -110.8900      63.4        72       147        60
OIR    2025250     91400   24.2200 -110.8800      37.6       135       139        60
OIR    2025250     91400   24.1400 -113.2500      18.9       133       135        60
OIR    2025250     91400   24.1400 -113.2600      18.8       133       130        60
OIR    2025250     91400   24.1400 -113.2700      18.7       132       127        60
OIR    2025250     91400   24.1300 -113.2500      18.8       133       135        60
OIR    2025250     91400   24.1300 -113.2600      18.7       133       131        60
OIR    2025250     91400   24.1300 -113.2700      18.7       133       127        60
OIR    2025250     91400   24.1300 -113.2800      18.6       132       125        60
OIR    2025250     91400   24.1300 -113.2900      18.3       131       124        60
OIR    2025250     91400   24.1300 -113.3000      17.9       130       124        60
OIR    2025250     91400   24.1300 -113.3100      17.6       128       124        60
OIR    2025250     91400   24.1300 -113.3200      17.4       127       124        60
OIR    2025250     91400   24.1300 -113.3300      17.3       127       123        60
OIR    2025250     91400   24.1300 -113.3400      17.3       127       123        60
OIR    2025250     91400   24.1300 -113.3500      17.3       127       120        60
OIR    2025250     91400   24.1300 -113.3600      17.3       128       117        60
OIR    2025250     91400   24.1300 -113.3700      17.1       129       117        60
OIR    2025250     91400   24.1300 -113.3800      16.7       130       116        60
OIR    2025250     91400   24.1300 -113.3900      15.8       131       117        60
OIR    2025250     91400   24.1300 -113.4000      14.9       132       119        60
OIR    2025250     91400   24.1300 -113.4100      14.5       132       121        60
OIR    2025250     91400   24.1300 -113.4200      14.1       132       126        60
OIR    2025250     91400   24.1300 -113.4300      13.8       132       131        60
OIR    2025250     91400   24.1300 -113.4400      13.1       134       134        60
OIR    2025250     91400   24.1300 -113.4500      12.1       137       138        60
OIR    2025250     91400   24.1200 -113.2500      18.7       133       136        60
OIR    2025250     91400   24.1200 -113.2600      18.7       133       132        60
OIR    2025250     91400   24.1200 -113.2700      18.7       133       128        60
OIR    2025250     91400   24.1200 -113.2800      18.7       133       126        60
OIR    2025250     91400   24.1200 -113.2900      18.7       133       125        60
OIR    2025250     91400   24.1200 -113.3000      18.5       133       124        60
OIR    2025250     91400   24.1200 -113.3100      18.3       132       124        60
OIR    2025250     91400   24.1200 -113.3200      18.0       131       124        60
OIR    2025250     91400   24.1200 -113.3300      17.9       130       123        60
OIR    2025250     91400   24.1200 -113.3400      17.9       130       123        60
OIR    2025250     91400   24.1200 -113.3500      17.8       131       120        60
OIR    2025250     91400   24.1200 -113.3600      17.7       131       116        60
OIR    2025250     91400   24.1200 -113.3700      17.3       131       115        60
OIR    2025250     91400   24.1200 -113.3800      16.8       132       115        60
OIR    2025250     91400   24.1200 -113.3900      15.9       132       115        60
OIR    2025250     91400   24.1200 -113.4000      15.2       133       116        60
OIR    2025250     91400   24.1200 -113.4100      14.5       133       119        60
OIR    2025250     91400   24.1200 -113.4200      14.3       133       123        60
OIR    2025250     91400   24.1200 -113.4300      14.0       133       128        60
OIR    2025250     91400   24.1200 -113.4400      13.4       135       131        60
OIR    2025250     91400   24.1200 -113.4500      12.1       138       134        60
OIR    2025250     91400   24.1200 -113.4600      11.7       139       136        60
OIR    2025250     91400   24.1200 -113.4700      11.4       140       139        60
OIR    2025250     91400   24.1100 -113.2600      18.7       133       135        60
OIR    2025250     91400   24.1100 -113.2700      18.8       133       131        60
OIR    2025250     91400   24.1100 -113.2800      18.9       134       128        60
OIR    2025250     91400   24.1100 -113.2900      19.2       136       127        60
OIR    2025250     91400   24.1100 -113.3000      19.5       137       126        60
OIR    2025250     91400   24.1100 -113.3100      19.7       138       125        60
OIR    2025250     91400   24.1100 -113.3200      19.7       138       125        60
OIR    2025250     91400   24.1100 -113.3300      19.7       139       124        60
OIR    2025250     91400   24.1100 -113.3400      19.5       138       123        60
OIR    2025250     91400   24.1100 -113.3500      19.0       137       122        60
OIR    2025250     91400   24.1100 -113.3600      18.3       135       119        60
OIR    2025250     91400   24.1100 -113.3700      17.5       134       116        60
OIR    2025250     91400   24.1100 -113.3800      16.8       133       116        60
OIR    2025250     91400   24.1100 -113.3900      16.0       133       115        60
OIR    2025250     91400   24.1100 -113.4000      15.2       134       116        60
OIR    2025250     91400   24.1100 -113.4100      14.7       135       117        60
OIR    2025250     91400   24.1100 -113.4200      14.5       135       122        60
OIR    2025250     91400   24.1100 -113.4300      14.2       135       126        60
OIR    2025250     91400   24.1100 -113.4400      13.4       136       130        60
OIR    2025250     91400   24.1100 -113.4500      12.0       139       131        60
OIR    2025250     91400   24.1100 -113.4600      11.4       140       133        60
OIR    2025250     91400   24.1100 -113.4700      11.1       141       136        60
OIR    2025250     91400   24.1000 -113.2600      18.7       133       138        60
OIR    2025250     91400   24.1000 -113.2700      19.0       133       134        60
OIR    2025250     91400   24.1000 -113.2800      19.6       136       131        60
OIR    2025250     91400   24.1000 -113.2900      19.9       138       129        60
OIR    2025250     91400   24.1000 -113.3000      20.1       139       127        60
OIR    2025250     91400   24.1000 -113.3100      20.1       139       128        60
OIR    2025250     91400   24.1000 -113.3200      20.0       140       128        60
OIR    2025250     91400   24.1000 -113.3300      19.9       140       126        60
OIR    2025250     91400   24.1000 -113.3400      19.7       140       124        60
OIR    2025250     91400   24.1000 -113.3500      19.2       139       122        60
OIR    2025250     91400   24.1000 -113.3600      18.4       138       122        60
OIR    2025250     91400   24.1000 -113.3700      17.6       136       121        60
OIR    2025250     91400   24.1000 -113.3800      16.8       135       121        60
OIR    2025250     91400   24.1000 -113.3900      16.1       135       121        60
OIR    2025250     91400   24.1000 -113.4000      15.4       136       121        60
OIR    2025250     91400   24.1000 -113.4100      14.8       136       121        60
OIR    2025250     91400   24.1000 -113.4200      14.5       137       123        60
OIR    2025250     91400   24.1000 -113.4300      14.1       137       128        60
OIR    2025250     91400   24.1000 -113.4400      13.3       138       133        60
OIR    2025250     91400   24.1000 -113.4500      11.9       140       134        60
OIR    2025250     91400   24.1000 -113.4600      11.2       141       135        60
OIR    2025250     91400   24.1000 -113.4700      10.8       141       138        60
OIR    2025250     91400   24.0900 -113.2800      20.3       138       137        60
OIR    2025250     91400   24.0900 -113.2900      20.4       139       135        60
OIR    2025250     91400   24.0900 -113.3000      20.3       140       134        60
OIR    2025250     91400   24.0900 -113.3100      20.2       140       131        60
OIR    2025250     91400   24.0900 -113.3200      20.1       140       129        60
OIR    2025250     91400   24.0900 -113.3300      20.0       140       128        60
OIR    2025250     91400   24.0900 -113.3400      19.8       141       126        60
OIR    2025250     91400   24.0900 -113.3500      19.4       141       124        60
OIR    2025250     91400   24.0900 -113.3600      18.8       141       124        60
OIR    2025250     91400   24.0900 -113.3700      17.9       139       124        60
OIR    2025250     91400   24.0900 -113.3800      16.9       138       124        60
OIR    2025250     91400   24.0900 -113.3900      16.1       137       125        60
OIR    2025250     91400   24.0900 -113.4000      15.4       137       125        60
OIR    2025250     91400   24.0900 -113.4100      14.8       138       125        60
OIR    2025250     91400   24.0900 -113.4200      14.4       138       125        60
OIR    2025250     91400   24.0900 -113.4300      14.0       138       129        60
OIR    2025250     91400   24.0900 -113.4400      13.1       139       134        60
OIR    2025250     91400   24.0900 -113.4500      11.6       141       137        60
OIR    2025250     91400   24.0900 -113.4600      10.9       142       138        60
OIR    2025250     91400   24.0800 -113.3100      20.4       140       138        60
OIR    2025250     91400   24.0800 -113.3200      20.3       140       133        60
OIR    2025250     91400   24.0800 -113.3300      20.1       141       128        60
OIR    2025250     91400   24.0800 -113.3400      19.9       141       127        60
OIR    2025250     91400   24.0800 -113.3500      19.5       142       126        60
OIR    2025250     91400   24.0800 -113.3600      18.8       143       126        60
OIR    2025250     91400   24.0800 -113.3700      17.9       143       125        60
OIR    2025250     91400   24.0800 -113.3800      16.8       140       125        60
OIR    2025250     91400   24.0800 -113.3900      15.9       139       125        60
OIR    2025250     91400   24.0800 -113.4000      15.2       139       126        60
OIR    2025250     91400   24.0800 -113.4100      14.6       139       126        60
OIR    2025250     91400   24.0800 -113.4200      14.2       139       126        60
OIR    2025250     91400   24.0800 -113.4300      13.8       139       128        60
OIR    2025250     91400   24.0800 -113.4400      12.8       141       132        60
OIR    2025250     91400   24.0800 -113.4500      11.4       143       136        60
OIR    2025250     91400   24.0700 -113.3200      20.8       142       138        60
OIR    2025250     91400   24.0700 -113.3300      20.4       142       132        60
OIR    2025250     91400   24.0700 -113.3400      20.0       143       129        60
OIR    2025250     91400   24.0700 -113.3500      19.3       144       128        60
OIR    2025250     91400   24.0700 -113.3600      18.5       145       127        60
OIR    2025250     91400   24.0700 -113.3700      17.8       145       126        60
OIR    2025250     91400   24.0700 -113.3800      16.7       144       126        60
OIR    2025250     91400   24.0700 -113.3900      15.8       141       126        60
OIR    2025250     91400   24.0700 -113.4000      15.2       140       127        60
OIR    2025250     91400   24.0700 -113.4100      14.5       141       127        60
OIR    2025250     91400   24.0700 -113.4200      14.0       141       127        60
OIR    2025250     91400   24.0700 -113.4300      13.4       141       128        60
OIR    2025250     91400   24.0700 -113.4400      12.4       143       130        60
OIR    2025250     91400   24.0700 -113.4500      10.8       147       134        60
OIR    2025250     91400   24.0600 -113.3300      20.5       143       137        60
OIR    2025250     91400   24.0600 -113.3400      19.9       145       134        60
OIR    2025250     91400   24.0600 -113.3500      18.9       146       130        60
OIR    2025250     91400   24.0600 -113.3600      18.1       147       128        60
OIR    2025250     91400   24.0600 -113.3700      17.4       148       128        60
OIR    2025250     91400   24.0600 -113.3800      16.6       147       128        60
OIR    2025250     91400   24.0600 -113.3900      15.8       145       128        60
OIR    2025250     91400   24.0600 -113.4000      14.9       142       128        60
OIR    2025250     91400   24.0600 -113.4100      14.1       143       129        60
OIR    2025250     91400   24.0600 -113.4200      13.5       142       131        60
OIR    2025250     91400   24.0600 -113.4300      12.6       143       132        60
OIR    2025250     91400   24.0600 -113.4400      11.2       145       136        60
OIR    2025250     91400   24.0500 -113.2800      23.0       141       138        60
OIR    2025250     91400   24.0500 -113.2900      22.8       142       135        60
OIR    2025250     91400   24.0500 -113.3000      22.4       142       137        60
OIR    2025250     91400   24.0500 -113.3100      21.8       143       138        60
OIR    2025250     91400   24.0500 -113.3500      18.5       150       134        60
OIR    2025250     91400   24.0500 -113.3600      17.8       150       127        60
OIR    2025250     91400   24.0500 -113.3700      17.2       150       129        60
OIR    2025250     91400   24.0500 -113.3800      16.6       150       131        60
OIR    2025250     91400   24.0500 -113.3900      15.6       148       131        60
OIR    2025250     91400   24.0500 -113.4000      14.5       146       130        60
OIR    2025250     91400   24.0500 -113.4100      13.3       145       130        60
OIR    2025250     91400   24.0500 -113.4200      12.3       146       133        60
OIR    2025250     91400   24.0500 -113.4300      11.3       146       136        60
OIR    2025250     91400   24.0400 -113.2600      25.4       134       136        60
OIR    2025250     91400   24.0400 -113.2700      25.2       137       132        60
OIR    2025250     91400   24.0400 -113.2800      24.7       139       131        60
OIR    2025250     91400   24.0400 -113.2900      24.0       141       130        60
OIR    2025250     91400   24.0400 -113.3000      23.2       142       131        60
OIR    2025250     91400   24.0400 -113.3100      22.5       144       132        60
OIR    2025250     91400   24.0400 -113.3200      21.6       145       133        60
OIR    2025250     91400   24.0400 -113.3300      20.1       147       134        60
OIR    2025250     91400   24.0400 -113.3400      18.8       150       135        60
OIR    2025250     91400   24.0400 -113.3500      18.3       152       135        60
OIR    2025250     91400   24.0400 -113.3600      17.7       152       134        60
OIR    2025250     91400   24.0400 -113.3700      17.2       152       134        60
OIR    2025250     91400   24.0400 -113.3800      16.4       152       134        60
OIR    2025250     91400   24.0400 -113.3900      15.2       151       135        60
OIR    2025250     91400   24.0400 -113.4000      13.7       150       135        60
OIR    2025250     91400   24.0400 -113.4100      12.2       149       135        60
OIR    2025250     91400   24.0400 -113.4200      11.0       150       137        60
OIR    2025250     91400   24.0300 -113.2500      27.5       131       136        60
OIR    2025250     91400   24.0300 -113.2600      27.7       132       130        60
OIR    2025250     91400   24.0300 -113.2700      26.9       135       125        60
OIR    2025250     91400   24.0300 -113.2800      25.8       137       125        60
OIR    2025250     91400   24.0300 -113.2900      24.7       139       125        60
OIR    2025250     91400   24.0300 -113.3000      23.7       142       126        60
OIR    2025250     91400   24.0300 -113.3100      22.8       144       127        60
OIR    2025250     91400   24.0300 -113.3200      21.8       147       128        60
OIR    2025250     91400   24.0300 -113.3300      20.0       150       129        60
OIR    2025250     91400   24.0300 -113.3400      18.6       152       130        60
OIR    2025250     91400   24.0300 -113.3500      18.0       152       133        60
OIR    2025250     91400   24.0300 -113.3600      17.6       153       137        60
OIR    2025250     91400   24.0300 -113.3800      16.0       154       138        60
OIR    2025250     91400   24.0300 -113.3900      14.3       155       138        60
OIR    2025250     91400   24.0200 -113.2400      26.3       124       137        60
OIR    2025250     91400   24.0200 -113.2500      28.1       129       127        60
OIR    2025250     91400   24.0200 -113.2600      28.5       131       126        60
OIR    2025250     91400   24.0200 -113.2700      27.8       134       125        60
OIR    2025250     91400   24.0200 -113.2800      26.4       136       124        60
OIR    2025250     91400   24.0200 -113.2900      25.2       138       124        60
OIR    2025250     91400   24.0200 -113.3000      23.9       141       124        60
OIR    2025250     91400   24.0200 -113.3100      22.8       143       125        60
OIR    2025250     91400   24.0200 -113.3200      21.4       147       126        60
OIR    2025250     91400   24.0200 -113.3300      19.5       151       127        60
OIR    2025250     91400   24.0200 -113.3400      18.5       153       127        60
OIR    2025250     91400   24.0200 -113.3500      18.0       153       129        60
OIR    2025250     91400   24.0200 -113.3600      17.6       153       132        60
OIR    2025250     91400   24.0200 -113.3700      16.8       153       135        60
OIR    2025250     91400   24.0100 -113.2400      27.4       124       133        60
OIR    2025250     91400   24.0100 -113.2500      28.7       127       120        60
OIR    2025250     91400   24.0100 -113.2600      29.2       130       121        60
OIR    2025250     91400   24.0100 -113.2700      28.4       133       123        60
OIR    2025250     91400   24.0100 -113.2800      26.8       136       123        60
OIR    2025250     91400   24.0100 -113.2900      25.3       139       123        60
OIR    2025250     91400   24.0100 -113.3000      23.8       141       122        60
OIR    2025250     91400   24.0100 -113.3100      22.6       143       123        60
OIR    2025250     91400   24.0100 -113.3200      21.0       146       124        60
OIR    2025250     91400   24.0100 -113.3300      19.3       151       125        60
OIR    2025250     91400   24.0100 -113.3400      18.4       153       125        60
OIR    2025250     91400   24.0100 -113.3500      18.1       153       126        60
OIR    2025250     91400   24.0100 -113.3600      17.7       153       128        60
OIR    2025250     91400   24.0100 -113.3700      16.5       154       130        60
OIR    2025250     91400   24.0100 -113.3800      14.0       154       136        60
OIR    2025250     91400   24.0000 -113.2400      28.8       125       130        60
OIR    2025250     91400   24.0000 -113.2500      29.4       127       120        60
OIR    2025250     91400   24.0000 -113.2600      29.4       128       116        60
OIR    2025250     91400   24.0000 -113.2700      27.6       131       120        60
OIR    2025250     91400   24.0000 -113.2800      26.2       134       122        60
OIR    2025250     91400   24.0000 -113.2900      24.6       140       122        60
OIR    2025250     91400   24.0000 -113.3000      23.3       142       123        60
OIR    2025250     91400   24.0000 -113.3100      22.0       144       124        60
OIR    2025250     91400   24.0000 -113.3200      20.5       147       125        60
OIR    2025250     91400   24.0000 -113.3300      19.2       151       126        60
OIR    2025250     91400   24.0000 -113.3400      18.4       153       125        60
OIR    2025250     91400   24.0000 -113.3500      18.2       153       124        60
OIR    2025250     91400   24.0000 -113.3600      17.7       154       126        60
OIR    2025250     91400   24.0000 -113.3700      16.8       154       128        60
OIR    2025250     91400   24.0000 -113.3800      14.5       154       132        60
OIR    2025250     91400   23.9900 -113.2300      28.9       123       134        60
OIR    2025250     91400   23.9900 -113.2400      29.3       125       126        60
OIR    2025250     91400   23.9900 -113.2500      29.5       126       120        60
OIR    2025250     91400   23.9900 -113.2600      28.5       130       116        60
OIR    2025250     91400   23.9900 -113.2700      27.3       132       116        60
OIR    2025250     91400   23.9900 -113.2800      25.3       136       117        60
OIR    2025250     91400   23.9900 -113.2900      23.3       140       120        60
OIR    2025250     91400   23.9900 -113.3000      22.3       143       122        60
OIR    2025250     91400   23.9900 -113.3100      21.2       146       124        60
OIR    2025250     91400   23.9900 -113.3200      20.0       148       126        60
OIR    2025250     91400   23.9900 -113.3300      19.1       151       127        60
OIR    2025250     91400   23.9900 -113.3400      18.5       153       125        60
OIR    2025250     91400   23.9900 -113.3500      18.3       154       123        60
OIR    2025250     91400   23.9900 -113.3600      17.7       154       124        60
OIR    2025250     91400   23.9900 -113.3700      17.2       154       126        60
OIR    2025250     91400   23.9900 -113.3800      15.5       154       129        60
OIR    2025250     91400   23.9900 -113.3900      12.1       155       134        60
OIR    2025250     91400   23.9800 -113.2300      29.3       123       134        60
OIR    2025250     91400   23.9800 -113.2400      29.3       125       127        60
OIR    2025250     91400   23.9800 -113.2500      29.2       126       123        60
OIR    2025250     91400   23.9800 -113.2600      26.8       131       120        60
OIR    2025250     91400   23.9800 -113.2700      26.1       132       120        60
OIR    2025250     91400   23.9800 -113.2800      24.0       137       121        60
OIR    2025250     91400   23.9800 -113.2900      22.3       141       122        60
OIR    2025250     91400   23.9800 -113.3000      21.1       144       123        60
OIR    2025250     91400   23.9800 -113.3100      20.2       147       124        60
OIR    2025250     91400   23.9800 -113.3200      19.4       149       125        60
OIR    2025250     91400   23.9800 -113.3300      18.8       151       126        60
OIR    2025250     91400   23.9800 -113.3400      18.4       153       125        60
OIR    2025250     91400   23.9800 -113.3500      18.1       154       124        60
OIR    2025250     91400   23.9800 -113.3600      17.5       154       124        60
OIR    2025250     91400   23.9800 -113.3700      17.0       154       126        60
OIR    2025250     91400   23.9800 -113.3800      15.6       154       128        60
OIR    2025250     91400   23.9800 -113.3900      12.7       155       133        60
OIR    2025250     91400   23.9800 -113.4000      10.9       156       138        60
OIR    2025250     91400   23.9700 -113.2300      29.7       124       134        60
OIR    2025250     91400   23.9700 -113.2400      29.1       126       125        60
OIR    2025250     91400   23.9700 -113.2500      28.5       128       125        60
OIR    2025250     91400   23.9700 -113.2600      26.5       131       124        60
OIR    2025250     91400   23.9700 -113.2700      25.7       133       124        60
OIR    2025250     91400   23.9700 -113.2800      23.0       139       124        60
OIR    2025250     91400   23.9700 -113.2900      20.9       143       124        60
OIR    2025250     91400   23.9700 -113.3000      19.8       146       124        60
OIR    2025250     91400   23.9700 -113.3100      19.0       148       125        60
OIR    2025250     91400   23.9700 -113.3200      18.6       150       125        60
OIR    2025250     91400   23.9700 -113.3300      18.3       151       125        60
OIR    2025250     91400   23.9700 -113.3400      18.0       153       125        60
OIR    2025250     91400   23.9700 -113.3500      17.4       153       125        60
OIR    2025250     91400   23.9700 -113.3600      16.9       154       124        60
OIR    2025250     91400   23.9700 -113.3700      16.3       153       127        60
OIR    2025250     91400   23.9700 -113.3800      14.9       153       129        60
OIR    2025250     91400   23.9700 -113.3900      12.5       154       133        60
OIR    2025250     91400   23.9700 -113.4000      11.2       155       137        60
OIR    2025250     91400   23.9600 -113.2300      29.2       127       134        60
OIR    2025250     91400   23.9600 -113.2400      28.5       129       128        60
OIR    2025250     91400   23.9600 -113.2500      27.9       130       126        60
OIR    2025250     91400   23.9600 -113.2600      26.7       131       125        60
OIR    2025250     91400   23.9600 -113.2700      25.1       133       125        60
OIR    2025250     91400   23.9600 -113.2800      21.7       139       125        60
OIR    2025250     91400   23.9600 -113.2900      19.6       144       126        60
OIR    2025250     91400   23.9600 -113.3000      18.6       147       127        60
OIR    2025250     91400   23.9600 -113.3100      18.0       149       129        60
OIR    2025250     91400   23.9600 -113.3200      17.8       150       129        60
OIR    2025250     91400   23.9600 -113.3300      17.6       151       129        60
OIR    2025250     91400   23.9600 -113.3400      17.3       152       128        60
OIR    2025250     91400   23.9600 -113.3500      16.9       153       128        60
OIR    2025250     91400   23.9600 -113.3600      16.5       153       128        60
OIR    2025250     91400   23.9600 -113.3700      15.9       153       130        60
OIR    2025250     91400   23.9600 -113.3800      14.4       152       132        60
OIR    2025250     91400   23.9600 -113.3900      12.3       152       135        60
OIR    2025250     91400   23.9600 -113.4000      11.2       153       138        60
OIR    2025250     91400   23.9500 -113.2200      28.4       125       135        60
OIR    2025250     91400   23.9500 -113.2300      28.6       128       132        60
OIR    2025250     91400   23.9500 -113.2400      28.5       130       129        60
OIR    2025250     91400   23.9500 -113.2500      28.1       131       127        60
OIR    2025250     91400   23.9500 -113.2600      27.1       132       125        60
OIR    2025250     91400   23.9500 -113.2700      24.3       135       125        60
OIR    2025250     91400   23.9500 -113.2800      20.2       142       127        60
OIR    2025250     91400   23.9500 -113.2900      18.3       146       128        60
OIR    2025250     91400   23.9500 -113.3000      17.6       148       130        60
OIR    2025250     91400   23.9500 -113.3100      17.4       149       133        60
OIR    2025250     91400   23.9500 -113.3200      17.3       151       134        60
OIR    2025250     91400   23.9500 -113.3300      17.1       152       134        60
OIR    2025250     91400   23.9500 -113.3400      16.8       153       134        60
OIR    2025250     91400   23.9500 -113.3500      16.5       153       133        60
OIR    2025250     91400   23.9500 -113.3600      16.1       154       132        60
OIR    2025250     91400   23.9500 -113.3700      15.3       153       134        60
OIR    2025250     91400   23.9500 -113.3800      13.8       152       138        60
OIR    2025250     91400   23.9400 -113.2200      29.1       127       131        60
OIR    2025250     91400   23.9400 -113.2300      29.3       129       128        60
OIR    2025250     91400   23.9400 -113.2400      29.1       131       127        60
OIR    2025250     91400   23.9400 -113.2500      28.6       131       126        60
OIR    2025250     91400   23.9400 -113.2600      27.0       133       126        60
OIR    2025250     91400   23.9400 -113.2700      21.5       139       125        60
OIR    2025250     91400   23.9400 -113.2800      17.8       145       129        60
OIR    2025250     91400   23.9400 -113.2900      17.0       147       133        60
OIR    2025250     91400   23.9400 -113.3000      16.8       149       136        60
OIR    2025250     91400   23.9400 -113.3100      16.7       150       138        60
OIR    2025250     91400   23.9400 -113.3300      16.5       152       138        60
OIR    2025250     91400   23.9400 -113.3400      16.3       152       138        60
OIR    2025250     91400   23.9400 -113.3500      16.0       153       137        60
OIR    2025250     91400   23.9400 -113.3600      15.4       154       136        60
OIR    2025250     91400   23.9400 -113.3700      14.6       153       136        60
OIR    2025250     91400   23.9300 -113.2000      33.3       128       137        60
OIR    2025250     91400   23.9300 -113.2100      32.7       128       132        60
OIR    2025250     91400   23.9300 -113.2200      31.7       129       127        60
OIR    2025250     91400   23.9300 -113.2300      30.8       130       123        60
OIR    2025250     91400   23.9300 -113.2400      30.1       131       124        60
OIR    2025250     91400   23.9300 -113.2500      29.3       132       125        60
OIR    2025250     91400   23.9300 -113.2600      25.6       135       126        60
OIR    2025250     91400   23.9300 -113.2700      18.1       142       126        60
OIR    2025250     91400   23.9300 -113.2800      16.9       146       131        60
OIR    2025250     91400   23.9300 -113.2900      16.6       147       138        60
OIR    2025250     91400   23.9300 -113.3700      13.6       153       138        60
OIR    2025250     91400   23.9200 -113.2000      34.1       128       131        60
OIR    2025250     91400   23.9200 -113.2100      33.8       129       127        60
OIR    2025250     91400   23.9200 -113.2200      32.8       130       125        60
OIR    2025250     91400   23.9200 -113.2300      31.8       131       122        60
OIR    2025250     91400   23.9200 -113.2400      30.9       132       124        60
OIR    2025250     91400   23.9200 -113.2500      28.7       134       126        60
OIR    2025250     91400   23.9200 -113.2600      20.1       139       128        60
OIR    2025250     91400   23.9200 -113.2700      17.5       144       129        60
OIR    2025250     91400   23.9200 -113.2800      16.8       146       133        60
OIR    2025250     91400   23.9200 -113.2900      16.6       147       138        60
OIR    2025250     91400   23.9200 -113.4400       9.8       155       138        60
OIR    2025250     91400   23.9100 -113.1900      34.4       129       129        60
OIR    2025250     91400   23.9100 -113.2000      34.4       129       124        60
OIR    2025250     91400   23.9100 -113.2100      34.1       130       121        60
OIR    2025250     91400   23.9100 -113.2200      33.3       131       122        60
OIR    2025250     91400   23.9100 -113.2300      32.3       132       122        60
OIR    2025250     91400   23.9100 -113.2400      29.6       133       124        60
OIR    2025250     91400   23.9100 -113.2500      23.2       136       126        60
OIR    2025250     91400   23.9100 -113.2600      19.5       140       130        60
OIR    2025250     91400   23.9100 -113.2700      17.7       144       133        60
OIR    2025250     91400   23.9100 -113.2800      16.9       146       136        60
OIR    2025250     91400   23.9100 -113.2900      16.6       147       138        60
OIR    2025250     91400   23.9000 -113.1800      33.6       128       137        60
OIR    2025250     91400   23.9000 -113.1900      34.2       129       128        60
OIR    2025250     91400   23.9000 -113.2000      33.9       129       125        60
OIR    2025250     91400   23.9000 -113.2100      33.5       132       122        60
OIR    2025250     91400   23.9000 -113.2200      32.4       132       123        60
OIR    2025250     91400   23.9000 -113.2300      29.9       132       123        60
OIR    2025250     91400   23.9000 -113.2400      24.1       136       126        60
OIR    2025250     91400   23.9000 -113.2500      20.6       139       131        60
OIR    2025250     91400   23.9000 -113.2600      19.5       141       136        60
OIR    2025250     91400   23.9000 -113.4300      10.6       150       139        60
OIR    2025250     91400   23.8900 -113.1800      30.2       126       134        60
OIR    2025250     91400   23.8900 -113.1900      31.8       128       126        60
OIR    2025250     91400   23.8900 -113.2000      32.4       131       125        60
OIR    2025250     91400   23.8900 -113.2100      32.1       133       124        60
OIR    2025250     91400   23.8900 -113.2200      30.6       135       124        60
OIR    2025250     91400   23.8900 -113.2300      27.4       136       126        60
OIR    2025250     91400   23.8900 -113.2400      22.4       139       128        60
OIR    2025250     91400   23.8900 -113.2500      19.8       140       136        60
OIR    2025250     91400   23.8800 -113.1800      24.4       117       135        60
OIR    2025250     91400   23.8800 -113.1900      28.8       128       129        60
OIR    2025250     91400   23.8800 -113.2000      30.3       132       127        60
OIR    2025250     91400   23.8800 -113.2100      30.5       134       127        60
OIR    2025250     91400   23.8800 -113.2200      28.7       137       128        60
OIR    2025250     91400   23.8800 -113.2300      25.7       139       130        60
OIR    2025250     91400   23.8800 -113.2400      21.8       140       132        60
OIR    2025250     91400   23.8800 -113.2500      19.7       140       138        60
OIR    2025250     91400   23.8700 -113.1800      22.3       114       136        60
OIR    2025250     91400   23.8700 -113.1900      25.1       122       131        60
OIR    2025250     91400   23.8700 -113.2000      27.4       131       129        60
OIR    2025250     91400   23.8700 -113.2100      27.3       135       131        60
OIR    2025250     91400   23.8700 -113.2200      25.5       138       133        60
OIR    2025250     91400   23.8700 -113.2300      23.5       139       136        60
OIR    2025250     91400   23.8600 -111.1300       9.8        95       136        60
OIR    2025250     91400   23.8600 -111.1400       9.4        93       136        60
OIR    2025250     91400   23.8600 -113.1900      22.5       118       136        60
OIR    2025250     91400   23.8600 -113.2000      24.2       130       134        60
OIR    2025250     91400   23.8600 -113.2100      24.3       135       136        60
OIR    2025250     91400   23.8500 -111.1100      12.2        87       131        60
OIR    2025250     91400   23.8500 -111.1200      10.4        91       129        60
OIR    2025250     91400   23.8500 -111.1300       9.4        93       129        60
OIR    2025250     91400   23.8500 -111.1400       8.9        91       130        60
OIR    2025250     91400   23.8500 -111.1500       8.7        90       134        60
OIR    2025250     91400   23.8400 -111.1000      15.4        77       137        60
OIR    2025250     91400   23.8400 -111.1100      12.8        79       125        60
OIR    2025250     91400   23.8400 -111.1200      10.9        83       120        60
OIR    2025250     91400   23.8400 -111.1300       9.0        87       122        60
OIR    2025250     91400   23.8400 -111.1400       8.2        82       124        60
OIR    2025250     91400   23.8400 -111.1500       8.0        81       127        60
OIR    2025250     91400   23.8400 -111.1600       7.8        74       131        60
OIR    2025250     91400   23.8400 -111.1700       8.2        66       136        60
OIR    2025250     91400   23.8300 -111.0900      20.0        69       133        60
OIR    2025250     91400   23.8300 -111.1000      17.1        68       128        60
OIR    2025250     91400   23.8300 -111.1100      15.0        67       127        60
OIR    2025250     91400   23.8300 -111.1200      13.1        66       123        60
OIR    2025250     91400   23.8300 -111.1300      10.3        66       123        60
OIR    2025250     91400   23.8300 -111.1400       8.6        70       123        60
OIR    2025250     91400   23.8300 -111.1500       8.7        70       126        60
OIR    2025250     91400   23.8300 -111.1600       8.7        64       131        60
OIR    2025250     91400   23.8300 -111.1700       8.6        64       135        60
OIR    2025250     91400   23.8200 -111.0900      21.3        68       127        60
OIR    2025250     91400   23.8200 -111.1000      18.7        65       117        60
OIR    2025250     91400   23.8200 -111.1100      17.1        62       122        60
OIR    2025250     91400   23.8200 -111.1200      15.5        60       126        60
OIR    2025250     91400   23.8200 -111.1300      13.0        60       126        60
OIR    2025250     91400   23.8200 -111.1400       9.5        67       124        60
OIR    2025250     91400   23.8200 -111.1500       9.2        66       124        60
OIR    2025250     91400   23.8200 -111.1600       9.1        63       130        60
OIR    2025250     91400   23.8200 -111.1700       8.9        63       135        60
OIR    2025250     91400   23.8100 -111.0900      21.8        67       134        60
OIR    2025250     91400   23.8100 -111.1000      19.7        63       119        60
OIR    2025250     91400   23.8100 -111.1100      18.8        60       122        60
OIR    2025250     91400   23.8100 -111.1200      18.0        57       126        60
OIR    2025250     91400   23.8100 -111.1300      17.0        57       128        60
OIR    2025250     91400   23.8100 -111.1400      13.1        63       125        60
OIR    2025250     91400   23.8100 -111.1500       9.6        63       124        60
OIR    2025250     91400   23.8100 -111.1600       9.5        63       128        60
OIR    2025250     91400   23.8100 -111.1700       9.3        64       132        60
OIR    2025250     91400   23.8000 -111.1000      20.8        62       125        60
OIR    2025250     91400   23.8000 -111.1100      20.1        60       123        60
OIR    2025250     91400   23.8000 -111.1200      19.5        58       126        60
OIR    2025250     91400   23.8000 -111.1300      19.1        58       129        60
OIR    2025250     91400   23.8000 -111.1400      18.2        57       127        60
OIR    2025250     91400   23.8000 -111.1500      12.1        58       125        60
OIR    2025250     91400   23.8000 -111.1600      10.2        63       126        60
OIR    2025250     91400   23.8000 -111.1700       9.5        66       129        60
OIR    2025250     91400   23.8000 -111.1800       8.3        67       132        60
OIR    2025250     91400   23.7900 -111.1100      21.4        60       131        60
OIR    2025250     91400   23.7900 -111.1200      21.1        59       127        60
OIR    2025250     91400   23.7900 -111.1300      20.5        59       123        60
OIR    2025250     91400   23.7900 -111.1400      19.5        59       122        60
OIR    2025250     91400   23.7900 -111.1500      16.2        61       122        60
OIR    2025250     91400   23.7900 -111.1600      13.2        72       122        60
OIR    2025250     91400   23.7900 -111.1700      11.4        78       123        60
OIR    2025250     91400   23.7900 -111.1800       8.2        75       124        60
OIR    2025250     91400   23.7900 -111.1900       8.0        76       136        60
OIR    2025250     91400   23.7800 -111.1200      22.5        62       131        60
OIR    2025250     91400   23.7800 -111.1300      22.1        64       120        60
OIR    2025250     91400   23.7800 -111.1400      19.8        64       115        60
OIR    2025250     91400   23.7800 -111.1500      17.8        70       116        60
OIR    2025250     91400   23.7800 -111.1600      16.8        75       117        60
OIR    2025250     91400   23.7800 -111.1700      14.9        76       116        60
OIR    2025250     91400   23.7800 -111.1800       8.8        78       116        60
OIR    2025250     91400   23.7800 -111.1900       8.6        80       125        60
OIR    2025250     91400   23.7700 -111.1300      22.7        66       130        60
OIR    2025250     91400   23.7700 -111.1400      20.3        70       123        60
OIR    2025250     91400   23.7700 -111.1500      18.3        77       122        60
OIR    2025250     91400   23.7700 -111.1600      17.2        79       121        60
OIR    2025250     91400   23.7700 -111.1700      15.0        81       119        60
OIR    2025250     91400   23.7700 -111.1800      10.8        87       116        60
OIR    2025250     91400   23.7700 -111.1900       9.6        86       119        60
OIR    2025250     91400   23.7700 -111.2000       6.5        74       131        60
OIR    2025250     91400   23.7600 -111.1400      21.8        78       137        60
OIR    2025250     91400   23.7600 -111.1500      19.5        84       132        60
OIR    2025250     91400   23.7600 -111.1600      17.3        87       128        60
OIR    2025250     91400   23.7600 -111.1700      15.2        90       124        60
OIR    2025250     91400   23.7600 -111.1800      12.9        94       122        60
OIR    2025250     91400   23.7600 -111.1900      10.2        87       121        60
OIR    2025250     91400   23.7600 -111.2000       7.4        81       129        60
OIR    2025250     91400   23.7500 -111.1700      15.4        96       134        60
OIR    2025250     91400   23.7500 -111.1800      13.6        96       132        60
OIR    2025250     91400   23.7500 -111.1900      11.8        94       130        60
OIR    2025250     91400   23.7500 -111.2000      10.0        92       133        60
OIR    2025250     91400   23.7500 -111.2100       6.7        84       136        60
OIR    2025250     91400   23.7400 -115.9500      15.4       122       135        60
OIR    2025250     91400   23.7300 -115.9600      15.4       122       137        60
OIR    2025250     91400   23.7300 -115.9700      15.4       123       138        60
OIR    2025250     91400   23.7000 -116.0900      17.3       147       138        60
OIR    2025250     91400   23.6900 -116.1000      17.1       148       129        60
OIR    2025250     91400   23.6800 -112.5300      29.5        61       137        60
OIR    2025250     91400   23.6800 -112.5400      28.2        63       135        60
OIR    2025250     91400   23.6800 -112.5500      26.2        67       132        60
OIR    2025250     91400   23.6800 -112.5600      23.2        75       134        60
OIR    2025250     91400   23.6800 -112.5700      19.6        86       136        60
OIR    2025250     91400   23.6800 -116.1000      17.1       147       119        60
OIR    2025250     91400   23.6700 -112.5100      32.5        45       137        60
OIR    2025250     91400   23.6700 -112.5200      33.0        41       135        60
OIR    2025250     91400   23.6700 -112.5300      32.8        41       134        60
OIR    2025250     91400   23.6700 -112.5400      31.9        42       130        60
OIR    2025250     91400   23.6700 -112.5500      29.4        47       126        60
OIR    2025250     91400   23.6700 -112.5600      25.0        58       127        60
OIR    2025250     91400   23.6700 -112.5700      20.0        76       132        60
OIR    2025250     91400   23.6700 -112.5800      15.5        97       136        60
OIR    2025250     91400   23.6700 -116.1000      17.1       147       127        60
OIR    2025250     91400   23.6600 -112.5100      32.7        41       129        60
OIR    2025250     91400   23.6600 -112.5200      32.8        41       129        60
OIR    2025250     91400   23.6600 -112.5300      32.6        40       130        60
OIR    2025250     91400   23.6600 -112.5400      31.4        40       126        60
OIR    2025250     91400   23.6600 -112.5500      29.0        42       121        60
OIR    2025250     91400   23.6600 -112.5600      24.6        50       119        60
OIR    2025250     91400   23.6600 -112.5700      18.9        62       127        60
OIR    2025250     91400   23.6600 -112.5800      13.7        92       134        60
OIR    2025250     91400   23.6600 -112.5900      11.2       117       137        60
OIR    2025250     91400   23.6600 -116.1000      17.1       147       126        60
OIR    2025250     91400   23.6600 -116.1100      17.0       147       137        60
OIR    2025250     91400   23.6500 -112.5100      31.9        43       136        60
OIR    2025250     91400   23.6500 -112.5200      32.2        42       130        60
OIR    2025250     91400   23.6500 -112.5300      30.6        42       126        60
OIR    2025250     91400   23.6500 -112.5400      28.0        38       127        60
OIR    2025250     91400   23.6500 -112.5500      24.3        40       129        60
OIR    2025250     91400   23.6500 -112.5600      20.0        48       131        60
OIR    2025250     91400   23.6500 -112.5700      15.0        57       132        60
OIR    2025250     91400   23.6500 -112.5800      10.7        78       135        60
OIR    2025250     91400   23.6500 -112.5900       9.5       109       137        60
OIR    2025250     91400   23.6400 -112.5200      29.7        54       134        60
OIR    2025250     91400   23.6400 -112.5300      27.1        49       125        60
OIR    2025250     91400   23.6400 -112.5400      21.2        37       124        60
OIR    2025250     91400   23.6400 -112.5500      17.1        38       133        60
OIR    2025250     91400   23.6300 -112.5200      29.0        77       136        60
OIR    2025250     91400   23.6300 -112.5300      23.9        65       130        60
OIR    2025250     91400   23.6300 -112.5400      14.6        38       126        60
OIR    2025250     91400   23.6300 -112.5500      11.8        37       133        60
OIR    2025250     91400   23.6200 -112.5200      29.3        89       135        60
OIR    2025250     91400   23.6200 -112.5300      24.6        80       133        60
OIR    2025250     91400   23.6200 -112.5400      10.5        39       131        60
OIR    2025250     91400   23.6200 -112.5500       9.6        38       134        60
OIR    2025250     91400   23.6100 -112.5200      28.3        91       135        60
OIR    2025250     91400   23.6100 -112.5300      23.2        84       134        60
OIR    2025250     91400   23.6100 -112.5400       9.2        40       134        60
OIR    2025250     91400   23.6100 -112.5500       9.1        39       136        60
OIR    2025250     91400   23.6000 -112.5200      25.1        88       136        60
OIR    2025250     91400   23.6000 -112.5300      18.0        76       134        60
OIR    2025250     91400   23.6000 -112.5400       9.0        39       136        60
OIR    2025250     91400   23.4500 -114.3000       4.2       149       127        60
OIR    2025250     91400   23.2800 -118.1000      19.5       149       139        60
OIR    2025250     91400   23.1600 -111.8500       5.1       146       130        60
OIR    2025250     91400   23.1600 -114.7500      35.1       150       117        60
OIR    2025250     91400   23.1600 -114.7600      34.2       146       116        60
OIR    2025250     91400   23.1600 -114.7700      32.3       142       124        60
OIR    2025250     91400   23.1500 -111.8500       4.5       147       138        60
OIR    2025250     91400   23.1300 -111.1000       9.7       177       136        60
OIR    2025250     91400   23.1100 -118.1300      19.3       149       140        60
OIR    2025250     91400   23.1100 -118.1800      19.3       149       140        60
OIR    2025250     91400   23.1000 -108.6100      18.0        35       133        60
OIR    2025250     91400   23.1000 -108.6200      17.4        36       138        60
OIR    2025250     91400   23.0900 -108.6100      17.0        37       136        60
OIR    2025250     91400   23.0800 -108.6100      14.0        44       138        60
OIR    2025250     91400   23.0700 -108.6100      12.2        50       137        60
OIR    2025250     91400   23.0700 -118.1200      19.2       149       140        60
OIR    2025250     91400   23.0600 -108.6100      11.3        53       139        60
OIR    2025250     91400   23.0500 -108.6600      10.7        55       138        60
OIR    2025250     91400   23.0500 -108.6700      10.7        55       139        60
OIR    2025250     91400   23.0300 -108.6100      10.8        55       139        60
OIR    2025250     91400   23.0000 -108.6100      10.7        56       139        60
OIR    2025250     91400   22.9900 -108.6100      10.7        56       139        60
OIR    2025250     91400   22.9800 -108.6100      10.7        56       139        60
OIR    2025250     91400   22.9800 -117.5900      18.7       145       152        60
OIR    2025250     91400   22.9800 -117.6000      18.7       146       115        60
OIR    2025250     91400   22.9300 -116.7200      19.8       141       149        60
OIR    2025250     91400   22.9300 -116.7300      19.8       141       129        60
OIR    2025250     91400   22.9200 -116.7300      19.8       141       134        60
OIR    2025250     91400   22.9000 -117.6000      13.4       136       134        60
OIR    2025250     91400   22.9000 -117.6100      13.5       137       130        60
OIR    2025250     91400   22.8900 -117.6200      12.9       136       121        60
OIR    2025250     91400   22.8800 -117.6200      12.3       135       134        60
OIR    2025250     91400   22.7700 -111.0300       4.2       315       134        60
OIR    2025250     91400   22.7600 -111.0200       4.7       311       137        60
OIR    2025250     91400   22.7600 -111.0300       4.1       312       132        60
OIR    2025250     91400   22.7600 -111.3100       4.0         2       134        60
OIR    2025250     91400   22.7600 -111.3200       4.1         3       134        60
OIR    2025250     91400   22.7600 -111.3300       4.1         3       133        60
OIR    2025250     91400   22.7600 -111.3400       4.1         3       134        60
OIR    2025250     91400   22.7600 -111.3500       4.1         3       134        60
OIR    2025250     91400   22.7500 -111.0100       4.8       308       135        60
OIR    2025250     91400   22.7500 -111.0200       4.5       307       131        60
OIR    2025250     91400   22.7400 -110.8700       9.4        70       138        60
OIR    2025250     91400   22.7400 -111.0000       4.5       306       135        60
OIR    2025250     91400   22.7400 -111.0100       4.4       305       131        60
OIR    2025250     91400   22.7400 -111.0200       4.0       303       127        60
OIR    2025250     91400   22.7300 -110.8500       9.2        70       135        60
OIR    2025250     91400   22.7300 -110.8600       9.3        69       134        60
OIR    2025250     91400   22.7300 -110.8700       9.3        69       134        60
OIR    2025250     91400   22.7300 -110.8800       9.4        68       136        60
OIR    2025250     91400   22.7200 -110.8300       8.3        83       137        60
OIR    2025250     91400   22.7200 -110.8400       8.9        72       133        60
OIR    2025250     91400   22.7200 -110.8500       9.1        70       128        60
OIR    2025250     91400   22.7200 -110.8600       9.2        69       128        60
OIR    2025250     91400   22.7200 -110.8700       9.1        68       131        60
OIR    2025250     91400   22.7200 -110.8800       9.0        65       133        60
OIR    2025250     91400   22.7200 -110.8900       8.0        64       135        60
OIR    2025250     91400   22.7200 -110.9000       6.1        59       137        60
OIR    2025250     91400   22.7100 -110.8300       7.7        83       131        60
OIR    2025250     91400   22.7100 -110.8400       8.0        77       128        60
OIR    2025250     91400   22.7100 -110.8500       8.5        72       125        60
OIR    2025250     91400   22.7100 -110.8600       8.5        71       123        60
OIR    2025250     91400   22.7100 -110.8700       8.2        69       126        60
OIR    2025250     91400   22.7100 -110.8800       7.5        65       129        60
OIR    2025250     91400   22.7100 -110.8900       5.8        64       130        60
OIR    2025250     91400   22.7000 -110.8200       7.1        86       133        60
OIR    2025250     91400   22.7000 -110.8300       7.0        85       127        60
OIR    2025250     91400   22.7000 -110.8400       7.0        83       124        60
OIR    2025250     91400   22.7000 -110.8500       7.2        80       122        60
OIR    2025250     91400   22.7000 -110.8600       6.9        80       119        60
OIR    2025250     91400   22.7000 -110.8700       6.0        78       121        60
OIR    2025250     91400   22.7000 -110.8800       4.6        75       123        60
OIR    2025250     91400   22.6900 -110.8100       7.1        84       138        60
OIR    2025250     91400   22.6900 -110.8200       6.9        85       132        60
OIR    2025250     91400   22.6900 -110.8300       6.8        85       125        60
OIR    2025250     91400   22.6900 -110.8400       6.6        85       121        60
OIR    2025250     91400   22.6900 -110.8500       6.4        86       120        60
OIR    2025250     91400   22.6900 -110.8600       5.4        91       119        60
OIR    2025250     91400   22.6900 -110.8700       4.0        97       120        60
OIR    2025250     91400   22.6800 -110.8100       6.6        86       137        60
OIR    2025250     91400   22.6800 -110.8200       6.8        86       132        60
OIR    2025250     91400   22.6800 -110.8300       6.3        89       125        60
OIR    2025250     91400   22.6800 -110.8400       5.8        92       120        60
OIR    2025250     91400   22.6800 -110.8500       5.3        94       120        60
OIR    2025250     91400   22.6800 -110.8600       4.0       101       120        60
OIR    2025250     91400   22.6700 -110.8000       4.6        88       138        60
OIR    2025250     91400   22.6700 -110.8100       5.5        94       134        60
OIR    2025250     91400   22.6700 -110.8200       5.7        97       130        60
OIR    2025250     91400   22.6700 -110.8300       4.7       110       125        60
OIR    2025250     91400   22.6700 -110.8400       4.0       122       120        60
OIR    2025250     91400   22.6600 -110.6500      17.3        86       137        60
OIR    2025250     91400   22.6300 -110.8800       4.0       184       123        60
OIR    2025250     91400   22.6300 -110.8900       4.1       185       124        60
OIR    2025250     91400   22.6300 -110.9000       4.1       187       125        60
OIR    2025250     91400   22.6300 -110.9100       4.1       189       125        60
OIR    2025250     91400   22.6300 -110.9200       4.1       191       126        60
OIR    2025250     91400   22.6300 -110.9300       4.1       193       126        60
OIR    2025250     91400   22.6200 -110.8700       4.0       184       123        60
OIR    2025250     91400   22.6200 -110.8800       4.1       185       124        60
OIR    2025250     91400   22.6200 -110.8900       4.3       187       124        60
OIR    2025250     91400   22.6200 -110.9000       4.4       189       124        60
OIR    2025250     91400   22.6200 -110.9100       4.4       190       125        60
OIR    2025250     91400   22.6200 -110.9200       4.5       192       126        60
OIR    2025250     91400   22.6200 -110.9300       4.6       193       126        60
OIR    2025250     91400   22.6200 -110.9400       4.5       195       126        60
OIR    2025250     91400   22.6200 -110.9500       4.2       197       127        60
OIR    2025250     91400   22.6200 -112.7400       8.3       237       136        60
OIR    2025250     91400   22.6100 -110.8700       4.1       185       124        60
OIR    2025250     91400   22.6100 -110.8800       4.3       187       125        60
OIR    2025250     91400   22.6100 -110.8900       4.5       189       125        60
OIR    2025250     91400   22.6100 -110.9000       4.7       190       125        60
OIR    2025250     91400   22.6100 -110.9100       5.0       192       125        60
OIR    2025250     91400   22.6100 -110.9200       5.1       193       125        60
OIR    2025250     91400   22.6100 -110.9300       5.2       194       126        60
OIR    2025250     91400   22.6100 -110.9400       5.3       196       127        60
OIR    2025250     91400   22.6100 -110.9500       5.1       196       127        60
OIR    2025250     91400   22.6100 -110.9600       4.7       197       128        60
OIR    2025250     91400   22.6100 -110.9700       4.2       200       129        60
OIR    2025250     91400   22.6100 -112.6900       5.0       270       137        60
OIR    2025250     91400   22.6100 -112.7000       5.1       267       128        60
OIR    2025250     91400   22.6100 -112.7100       5.4       255       127        60
OIR    2025250     91400   22.6100 -112.7200       6.9       250       126        60
OIR    2025250     91400   22.6100 -112.7300       8.0       241       123        60
OIR    2025250     91400   22.6100 -112.7400       8.2       238       120        60
OIR    2025250     91400   22.6100 -112.7500       8.1       238       126        60
OIR    2025250     91400   22.6000 -110.8700       4.2       187       124        60
OIR    2025250     91400   22.6000 -110.8800       4.6       189       125        60
OIR    2025250     91400   22.6000 -110.8900       5.0       191       126        60
OIR    2025250     91400   22.6000 -110.9000       5.5       193       127        60
OIR    2025250     91400   22.6000 -110.9100       6.1       195       128        60
OIR    2025250     91400   22.6000 -110.9200       6.6       196       128        60
OIR    2025250     91400   22.6000 -110.9300       6.6       196       128        60
OIR    2025250     91400   22.6000 -110.9400       6.5       197       128        60
OIR    2025250     91400   22.6000 -110.9500       6.4       196       129        60
OIR    2025250     91400   22.6000 -110.9600       6.0       197       130        60
OIR    2025250     91400   22.6000 -110.9700       5.4       199       132        60
OIR    2025250     91400   22.6000 -110.9800       4.6       205       133        60
OIR    2025250     91400   22.6000 -110.9900       4.2       211       133        60
OIR    2025250     91400   22.6000 -112.7000       5.1       268       129        60
OIR    2025250     91400   22.6000 -112.7100       5.5       266       128        60
OIR    2025250     91400   22.6000 -112.7200       6.1       257       127        60
OIR    2025250     91400   22.6000 -112.7300       7.1       243       126        60
OIR    2025250     91400   22.6000 -112.7400       7.6       238       126        60
OIR    2025250     91400   22.6000 -112.7500       7.9       240       128        60
OIR    2025250     91400   22.6000 -112.7600       7.5       241       135        60
OIR    2025250     91400   22.6000 -118.4600      18.6       149       126        60
OIR    2025250     91400   22.5900 -110.8700       4.3       189       124        60
OIR    2025250     91400   22.5900 -110.8800       4.9       191       126        60
OIR    2025250     91400   22.5900 -110.8900       5.7       194       128        60
OIR    2025250     91400   22.5900 -110.9000       6.8       196       129        60
OIR    2025250     91400   22.5900 -110.9100       7.8       197       130        60
OIR    2025250     91400   22.5900 -110.9200       8.6       198       131        60
OIR    2025250     91400   22.5900 -110.9300       8.9       198       131        60
OIR    2025250     91400   22.5900 -110.9400       8.7       198       131        60
OIR    2025250     91400   22.5900 -110.9500       8.4       198       132        60
OIR    2025250     91400   22.5900 -110.9600       7.9       198       132        60
OIR    2025250     91400   22.5900 -110.9700       7.1       200       134        60
OIR    2025250     91400   22.5900 -110.9800       6.1       204       136        60
OIR    2025250     91400   22.5900 -110.9900       5.2       208       137        60
OIR    2025250     91400   22.5900 -111.0000       4.4       214       136        60
OIR    2025250     91400   22.5800 -110.8700       4.2       188       125        60
OIR    2025250     91400   22.5800 -110.8800       5.2       193       126        60
OIR    2025250     91400   22.5800 -110.8900       6.4       195       128        60
OIR    2025250     91400   22.5800 -110.9000       8.0       197       129        60
OIR    2025250     91400   22.5800 -110.9100       9.2       199       131        60
OIR    2025250     91400   22.5800 -110.9200       9.9       200       132        60
OIR    2025250     91400   22.5800 -110.9300      10.2       200       133        60
OIR    2025250     91400   22.5800 -110.9400      10.2       200       134        60
OIR    2025250     91400   22.5800 -110.9500      10.0       200       135        60
OIR    2025250     91400   22.5800 -110.9600       9.5       200       136        60
OIR    2025250     91400   22.5800 -110.9700       8.6       202       137        60
OIR    2025250     91400   22.5700 -110.8700       4.0       186       125        60
OIR    2025250     91400   22.5700 -110.8800       5.0       192       126        60
OIR    2025250     91400   22.5700 -110.8900       6.7       196       128        60
OIR    2025250     91400   22.5700 -110.9000       8.8       199       130        60
OIR    2025250     91400   22.5700 -110.9100      10.0       200       131        60
OIR    2025250     91400   22.5700 -110.9200      10.3       200       133        60
OIR    2025250     91400   22.5700 -110.9300      10.5       200       135        60
OIR    2025250     91400   22.5700 -110.9400      10.5       201       137        60
OIR    2025250     91400   22.5700 -110.9500      10.5       201       138        60
OIR    2025250     91400   22.5600 -110.7100      18.4       138       137        60
OIR    2025250     91400   22.5600 -110.7200       9.8       146       136        60
OIR    2025250     91400   22.5600 -110.8800       4.5       189       125        60
OIR    2025250     91400   22.5600 -110.8900       6.2       193       126        60
OIR    2025250     91400   22.5600 -110.9000       8.7       198       127        60
OIR    2025250     91400   22.5600 -110.9100      10.1       200       129        60
OIR    2025250     91400   22.5600 -110.9200      10.5       200       131        60
OIR    2025250     91400   22.5600 -110.9300      10.5       201       133        60
OIR    2025250     91400   22.5600 -110.9400      10.6       201       136        60
OIR    2025250     91400   22.5600 -110.9500      10.6       201       138        60
OIR    2025250     91400   22.5500 -110.6800      10.2       126       139        60
OIR    2025250     91400   22.5500 -110.6900      12.5       127       132        60
OIR    2025250     91400   22.5500 -110.7000      11.1       130       125        60
OIR    2025250     91400   22.5500 -110.7100       6.9       133       122        60
OIR    2025250     91400   22.5500 -110.8800       4.3       187       125        60
OIR    2025250     91400   22.5500 -110.8900       5.3       191       124        60
OIR    2025250     91400   22.5500 -110.9000       7.5       196       124        60
OIR    2025250     91400   22.5500 -110.9100       9.6       199       126        60
OIR    2025250     91400   22.5500 -110.9200      10.3       200       128        60
OIR    2025250     91400   22.5500 -110.9300      10.5       201       130        60
OIR    2025250     91400   22.5500 -110.9400      10.6       201       132        60
OIR    2025250     91400   22.5500 -110.9500      10.6       202       135        60
OIR    2025250     91400   22.5500 -110.9600      10.6       204       137        60
OIR    2025250     91400   22.5400 -110.6600       4.9       120       138        60
OIR    2025250     91400   22.5400 -110.6700       5.6       128       133        60
OIR    2025250     91400   22.5400 -110.6800       8.5       142       127        60
OIR    2025250     91400   22.5400 -110.6900       9.3       138       123        60
OIR    2025250     91400   22.5400 -110.7000       7.5       139       119        60
OIR    2025250     91400   22.5400 -110.8800       4.0       188       124        60
OIR    2025250     91400   22.5400 -110.8900       4.7       191       123        60
OIR    2025250     91400   22.5400 -110.9000       6.1       195       123        60
OIR    2025250     91400   22.5400 -110.9100       8.2       199       124        60
OIR    2025250     91400   22.5400 -110.9200       9.6       201       126        60
OIR    2025250     91400   22.5400 -110.9300      10.3       202       127        60
OIR    2025250     91400   22.5400 -110.9400      10.5       202       129        60
OIR    2025250     91400   22.5400 -110.9500      10.6       203       131        60
OIR    2025250     91400   22.5400 -110.9600      10.7       205       135        60
OIR    2025250     91400   22.5300 -110.8900       4.0       193       123        60
OIR    2025250     91400   22.5300 -110.9000       5.0       197       123        60
OIR    2025250     91400   22.5300 -110.9100       6.7       201       123        60
OIR    2025250     91400   22.5300 -110.9200       8.4       202       125        60
OIR    2025250     91400   22.5300 -110.9300       9.6       202       126        60
OIR    2025250     91400   22.5300 -110.9400      10.3       202       127        60
OIR    2025250     91400   22.5300 -110.9500      10.5       203       127        60
OIR    2025250     91400   22.5300 -110.9600      10.7       206       132        60
OIR    2025250     91400   22.5300 -110.9700      10.9       209       138        60
OIR    2025250     91400   22.5200 -110.6400       4.1       137       138        60
OIR    2025250     91400   22.5200 -110.9000       4.1       198       120        60
OIR    2025250     91400   22.5200 -110.9100       5.1       201       121        60
OIR    2025250     91400   22.5200 -110.9200       6.7       202       123        60
OIR    2025250     91400   22.5200 -110.9300       8.0       202       124        60
OIR    2025250     91400   22.5200 -110.9400       9.0       204       125        60
OIR    2025250     91400   22.5200 -110.9500       9.9       205       125        60
OIR    2025250     91400   22.5200 -110.9600      10.4       208       127        60
OIR    2025250     91400   22.5200 -110.9700      10.9       211       134        60
OIR    2025250     91400   22.5100 -110.9200       4.2       205       119        60
OIR    2025250     91400   22.5100 -110.9300       5.1       207       121        60
OIR    2025250     91400   22.5100 -110.9400       6.7       208       123        60
OIR    2025250     91400   22.5100 -110.9500       8.5       209       123        60
OIR    2025250     91400   22.5100 -110.9600       9.9       211       123        60
OIR    2025250     91400   22.5100 -110.9700      10.7       213       127        60
OIR    2025250     91400   22.5100 -110.9800      11.4       215       132        60
OIR    2025250     91400   22.5100 -110.9900      12.7       216       137        60
OIR    2025250     91400   22.5000 -110.9500       5.7       212       120        60
OIR    2025250     91400   22.5000 -110.9600       8.0       214       121        60
OIR    2025250     91400   22.5000 -110.9700      10.3       217       123        60
OIR    2025250     91400   22.5000 -110.9800      11.5       219       126        60
OIR    2025250     91400   22.5000 -110.9900      13.1       219       129        60
OIR    2025250     91400   22.5000 -111.0000      13.5       220       135        60
OIR    2025250     91400   22.4900 -110.9600       5.4       219       116        60
OIR    2025250     91400   22.4900 -110.9700       8.4       222       119        60
OIR    2025250     91400   22.4900 -110.9800      10.9       223       122        60
OIR    2025250     91400   22.4900 -110.9900      13.1       221       125        60
OIR    2025250     91400   22.4900 -111.0000      13.5       221       129        60
OIR    2025250     91400   22.4900 -111.0100      14.0       223       133        60
OIR    2025250     91400   22.4800 -110.9700       6.4       227       116        60
OIR    2025250     91400   22.4800 -110.9800       9.6       225       119        60
OIR    2025250     91400   22.4800 -110.9900      12.5       222       122        60
OIR    2025250     91400   22.4800 -111.0000      13.6       223       125        60
OIR    2025250     91400   22.4800 -111.0100      14.3       225       127        60
OIR    2025250     91400   22.4800 -111.0200      15.1       227       130        60
OIR    2025250     91400   22.4700 -110.9700       4.8       236       116        60
OIR    2025250     91400   22.4700 -110.9800       7.6       229       117        60
OIR    2025250     91400   22.4700 -110.9900      10.6       225       121        60
OIR    2025250     91400   22.4700 -111.0000      13.1       226       123        60
OIR    2025250     91400   22.4700 -111.0100      14.2       227       125        60
OIR    2025250     91400   22.4700 -111.0200      14.9       227       127        60
OIR    2025250     91400   22.4700 -111.0300      15.2       227       134        60
OIR    2025250     91400   22.4600 -110.9700       4.1       249       116        60
OIR    2025250     91400   22.4600 -110.9800       5.5       246       119        60
OIR    2025250     91400   22.4600 -110.9900       7.5       237       120        60
OIR    2025250     91400   22.4600 -111.0000      11.3       231       122        60
OIR    2025250     91400   22.4600 -111.0100      13.7       229       123        60
OIR    2025250     91400   22.4600 -111.0200      14.5       228       124        60
OIR    2025250     91400   22.4600 -111.0300      15.0       228       128        60
OIR    2025250     91400   22.4600 -111.0400      15.1       227       136        60
OIR    2025250     91400   22.4600 -118.4400      18.1       149       136        60
OIR    2025250     91400   22.4500 -110.6100       7.0       102       137        60
OIR    2025250     91400   22.4500 -110.9700       4.2       264       115        60
OIR    2025250     91400   22.4500 -110.9800       4.9       263       117        60
OIR    2025250     91400   22.4500 -110.9900       5.6       258       120        60
OIR    2025250     91400   22.4500 -111.0000       7.5       246       122        60
OIR    2025250     91400   22.4500 -111.0100      12.1       235       122        60
OIR    2025250     91400   22.4500 -111.0200      13.9       230       123        60
OIR    2025250     91400   22.4500 -111.0300      14.7       228       125        60
OIR    2025250     91400   22.4500 -111.0400      14.9       227       133        60
OIR    2025250     91400   22.4400 -110.5900      16.7        62       137        60
OIR    2025250     91400   22.4400 -110.6000       7.0        76       134        60
OIR    2025250     91400   22.4400 -110.6100       6.2        82       131        60
OIR    2025250     91400   22.4400 -110.6200       4.1        81       130        60
OIR    2025250     91400   22.4400 -110.9300       4.0       298       104        60
OIR    2025250     91400   22.4400 -110.9400       4.1       299       105        60
OIR    2025250     91400   22.4400 -110.9600       4.1       287       112        60
OIR    2025250     91400   22.4400 -110.9700       4.5       281       115        60
OIR    2025250     91400   22.4400 -110.9800       5.0       274       117        60
OIR    2025250     91400   22.4400 -110.9900       5.3       269       120        60
OIR    2025250     91400   22.4400 -111.0000       6.0       263       122        60
OIR    2025250     91400   22.4400 -111.0100       7.8       248       122        60
OIR    2025250     91400   22.4400 -111.0200      12.0       232       122        60
OIR    2025250     91400   22.4400 -111.0300      14.0       229       123        60
OIR    2025250     91400   22.4400 -111.0400      14.5       227       131        60
OIR    2025250     91400   22.4300 -110.5900      20.3        61       125        60
OIR    2025250     91400   22.4300 -110.6000       6.4        59       122        60
OIR    2025250     91400   22.4300 -110.6100       6.3        66       125        60
OIR    2025250     91400   22.4300 -110.6200       4.6        63       126        60
OIR    2025250     91400   22.4300 -110.9200       4.5       303       105        60
OIR    2025250     91400   22.4300 -110.9300       4.9       304       105        60
OIR    2025250     91400   22.4300 -110.9400       5.0       304       108        60
OIR    2025250     91400   22.4300 -110.9500       5.1       302       110        60
OIR    2025250     91400   22.4300 -110.9600       5.0       299       112        60
OIR    2025250     91400   22.4300 -110.9700       5.0       292       114        60
OIR    2025250     91400   22.4300 -110.9800       5.1       284       116        60
OIR    2025250     91400   22.4300 -110.9900       5.4       278       119        60
OIR    2025250     91400   22.4300 -111.0000       5.8       273       122        60
OIR    2025250     91400   22.4300 -111.0100       6.3       268       123        60
OIR    2025250     91400   22.4300 -111.0200       7.5       254       123        60
OIR    2025250     91400   22.4300 -111.0300      11.3       236       122        60
OIR    2025250     91400   22.4300 -111.0400      13.4       229       127        60
OIR    2025250     91400   22.4300 -111.0500      13.6       226       135        60
OIR    2025250     91400   22.4200 -110.5800      33.6        45       138        60
OIR    2025250     91400   22.4200 -110.5900      18.7        56       124        60
OIR    2025250     91400   22.4200 -110.6000      10.3        50       116        60
OIR    2025250     91400   22.4200 -110.6100       8.5        50       120        60
OIR    2025250     91400   22.4200 -110.6200       6.7        43       122        60
OIR    2025250     91400   22.4200 -110.6300       5.2        52       122        60
OIR    2025250     91400   22.4200 -110.6400       4.2        69       122        60
OIR    2025250     91400   22.4200 -110.9100       4.3       309       104        60
OIR    2025250     91400   22.4200 -110.9200       5.0       307       105        60
OIR    2025250     91400   22.4200 -110.9300       5.2       306       108        60
OIR    2025250     91400   22.4200 -110.9400       5.4       306       109        60
OIR    2025250     91400   22.4200 -110.9500       5.5       305       111        60
OIR    2025250     91400   22.4200 -110.9600       5.4       303       113        60
OIR    2025250     91400   22.4200 -110.9700       5.4       299       114        60
OIR    2025250     91400   22.4200 -110.9800       5.5       293       116        60
OIR    2025250     91400   22.4200 -110.9900       5.8       289       117        60
OIR    2025250     91400   22.4200 -111.0000       6.2       286       121        60
OIR    2025250     91400   22.4200 -111.0100       6.7       281       124        60
OIR    2025250     91400   22.4200 -111.0200       7.1       276       123        60
OIR    2025250     91400   22.4200 -111.0300       7.9       269       123        60
OIR    2025250     91400   22.4200 -111.0400       9.8       254       124        60
OIR    2025250     91400   22.4200 -111.0500      10.2       244       130        60
OIR    2025250     91400   22.4200 -111.0600      10.1       247       136        60
OIR    2025250     91400   22.4100 -110.5900      17.4        48       125        60
OIR    2025250     91400   22.4100 -110.6000      12.5        42       114        60
OIR    2025250     91400   22.4100 -110.6100      11.5        39       116        60
OIR    2025250     91400   22.4100 -110.6200      10.4        34       120        60
OIR    2025250     91400   22.4100 -110.6300       9.8        41       119        60
OIR    2025250     91400   22.4100 -110.6400       6.8        61       119        60
OIR    2025250     91400   22.4100 -110.6500       4.7        68       117        60
OIR    2025250     91400   22.4100 -110.9000       4.0       316       107        60
OIR    2025250     91400   22.4100 -110.9100       4.6       312       109        60
OIR    2025250     91400   22.4100 -110.9200       5.2       309       110        60
OIR    2025250     91400   22.4100 -110.9300       5.4       308       111        60
OIR    2025250     91400   22.4100 -110.9400       5.6       307       111        60
OIR    2025250     91400   22.4100 -110.9500       5.6       306       112        60
OIR    2025250     91400   22.4100 -110.9600       5.6       305       113        60
OIR    2025250     91400   22.4100 -110.9700       5.7       302       114        60
OIR    2025250     91400   22.4100 -110.9800       5.9       298       116        60
OIR    2025250     91400   22.4100 -110.9900       6.2       293       116        60
OIR    2025250     91400   22.4100 -111.0000       6.5       290       120        60
OIR    2025250     91400   22.4100 -111.0100       6.8       285       123        60
OIR    2025250     91400   22.4100 -111.0200       7.3       280       123        60
OIR    2025250     91400   22.4100 -111.0300       7.7       275       123        60
OIR    2025250     91400   22.4100 -111.0400       9.0       265       124        60
OIR    2025250     91400   22.4100 -111.0500       9.4       259       129        60
OIR    2025250     91400   22.4100 -111.0600       9.7       255       134        60
OIR    2025250     91400   22.4000 -110.5900      17.5        40       131        60
OIR    2025250     91400   22.4000 -110.6000      14.2        30       116        60
OIR    2025250     91400   22.4000 -110.6100      14.8        32       117        60
OIR    2025250     91400   22.4000 -110.6200      15.4        31       120        60
OIR    2025250     91400   22.4000 -110.6300      15.9        36       119        60
OIR    2025250     91400   22.4000 -110.6400      15.7        43       116        60
OIR    2025250     91400   22.4000 -110.6500      11.4        48       115        60
OIR    2025250     91400   22.4000 -110.6600       4.1        72       113        60
OIR    2025250     91400   22.4000 -110.9000       4.4       321       108        60
OIR    2025250     91400   22.4000 -110.9100       4.9       315       111        60
OIR    2025250     91400   22.4000 -110.9200       5.4       311       113        60
OIR    2025250     91400   22.4000 -110.9300       5.6       309       114        60
OIR    2025250     91400   22.4000 -110.9400       5.7       308       114        60
OIR    2025250     91400   22.4000 -110.9500       5.7       307       114        60
OIR    2025250     91400   22.4000 -110.9600       5.8       306       114        60
OIR    2025250     91400   22.4000 -110.9700       5.9       304       115        60
OIR    2025250     91400   22.4000 -110.9800       6.2       300       116        60
OIR    2025250     91400   22.4000 -110.9900       6.5       297       117        60
OIR    2025250     91400   22.4000 -111.0000       6.7       293       119        60
OIR    2025250     91400   22.4000 -111.0100       7.0       288       121        60
OIR    2025250     91400   22.4000 -111.0200       7.4       283       122        60
OIR    2025250     91400   22.4000 -111.0300       7.8       278       123        60
OIR    2025250     91400   22.4000 -111.0400       9.4       268       124        60
OIR    2025250     91400   22.4000 -111.0500       9.4       265       129        60
OIR    2025250     91400   22.4000 -111.0600       9.6       262       134        60
OIR    2025250     91400   22.3900 -110.5900      20.2        30       136        60
OIR    2025250     91400   22.3900 -110.6000      16.3        25       124        60
OIR    2025250     91400   22.3900 -110.6100      19.1        31       120        60
OIR    2025250     91400   22.3900 -110.6200      22.3        34       121        60
OIR    2025250     91400   22.3900 -110.6300      20.6        38       120        60
OIR    2025250     91400   22.3900 -110.6400      17.8        44       116        60
OIR    2025250     91400   22.3900 -110.6500      15.1        48       113        60
OIR    2025250     91400   22.3900 -110.6600       5.7        72       111        60
OIR    2025250     91400   22.3900 -110.8900       4.2       332       109        60
OIR    2025250     91400   22.3900 -110.9000       4.7       324       110        60
OIR    2025250     91400   22.3900 -110.9100       5.2       317       112        60
OIR    2025250     91400   22.3900 -110.9200       5.6       312       113        60
OIR    2025250     91400   22.3900 -110.9300       5.7       310       113        60
OIR    2025250     91400   22.3900 -110.9400       5.7       309       114        60
OIR    2025250     91400   22.3900 -110.9500       5.8       307       114        60
OIR    2025250     91400   22.3900 -110.9600       5.8       306       114        60
OIR    2025250     91400   22.3900 -110.9700       6.0       304       114        60
OIR    2025250     91400   22.3900 -110.9800       6.4       301       116        60
OIR    2025250     91400   22.3900 -110.9900       6.7       298       116        60
OIR    2025250     91400   22.3900 -111.0000       6.9       296       117        60
OIR    2025250     91400   22.3900 -111.0100       7.2       291       120        60
OIR    2025250     91400   22.3900 -111.0200       7.6       286       122        60
OIR    2025250     91400   22.3900 -111.0300       8.0       280       123        60
OIR    2025250     91400   22.3900 -111.0400       9.3       270       124        60
OIR    2025250     91400   22.3900 -111.0500       9.4       268       127        60
OIR    2025250     91400   22.3900 -111.0600       9.5       268       133        60
OIR    2025250     91400   22.3800 -110.6000      22.5        25       132        60
OIR    2025250     91400   22.3800 -110.6100      25.3        37       126        60
OIR    2025250     91400   22.3800 -110.6200      26.8        41       125        60
OIR    2025250     91400   22.3800 -110.6300      25.8        43       123        60
OIR    2025250     91400   22.3800 -110.6400      21.0        47       121        60
OIR    2025250     91400   22.3800 -110.6500      14.4        54       117        60
OIR    2025250     91400   22.3800 -110.6600       7.8        63       116        60
OIR    2025250     91400   22.3800 -110.7800       4.2        39       108        60
OIR    2025250     91400   22.3800 -110.7900       4.4        34       107        60
OIR    2025250     91400   22.3800 -110.8000       4.5        32       104        60
OIR    2025250     91400   22.3800 -110.8100       4.5        30       104        60
OIR    2025250     91400   22.3800 -110.8200       4.2        22       103        60
OIR    2025250     91400   22.3800 -110.8300       4.3        20       103        60
OIR    2025250     91400   22.3800 -110.8400       4.4        18       103        60
OIR    2025250     91400   22.3800 -110.8500       4.4        16       103        60
OIR    2025250     91400   22.3800 -110.8600       4.4        11       104        60
OIR    2025250     91400   22.3800 -110.8700       4.4         3       107        60
OIR    2025250     91400   22.3800 -110.8800       4.4       350       110        60
OIR    2025250     91400   22.3800 -110.8900       4.5       338       111        60
OIR    2025250     91400   22.3800 -110.9000       5.0       325       112        60
OIR    2025250     91400   22.3800 -110.9100       5.3       319       113        60
OIR    2025250     91400   22.3800 -110.9200       5.6       313       113        60
OIR    2025250     91400   22.3800 -110.9300       5.7       311       113        60
OIR    2025250     91400   22.3800 -110.9400       5.8       309       113        60
OIR    2025250     91400   22.3800 -110.9500       5.8       308       114        60
OIR    2025250     91400   22.3800 -110.9600       5.9       307       114        60
OIR    2025250     91400   22.3800 -110.9700       6.1       305       114        60
OIR    2025250     91400   22.3800 -110.9800       6.6       302       115        60
OIR    2025250     91400   22.3800 -110.9900       6.8       300       116        60
OIR    2025250     91400   22.3800 -111.0000       7.2       298       116        60
OIR    2025250     91400   22.3800 -111.0100       7.6       295       120        60
OIR    2025250     91400   22.3800 -111.0200       7.9       292       123        60
OIR    2025250     91400   22.3800 -111.0300       8.3       287       123        60
OIR    2025250     91400   22.3800 -111.0400       9.0       275       123        60
OIR    2025250     91400   22.3800 -111.0500       9.4       269       125        60
OIR    2025250     91400   22.3800 -111.0600       9.5       269       131        60
OIR    2025250     91400   22.3800 -111.0700       9.9       272       138        60
OIR    2025250     91400   22.3700 -110.6100      27.2        41       132        60
OIR    2025250     91400   22.3700 -110.6200      26.9        43       129        60
OIR    2025250     91400   22.3700 -110.6300      27.3        45       127        60
OIR    2025250     91400   22.3700 -110.6400      24.9        50       124        60
OIR    2025250     91400   22.3700 -110.6500      13.3        60       123        60
OIR    2025250     91400   22.3700 -110.6600       6.6        71       121        60
OIR    2025250     91400   22.3700 -110.6700       4.2        78       120        60
OIR    2025250     91400   22.3700 -110.7600       4.3        40       111        60
OIR    2025250     91400   22.3700 -110.7700       4.6        37       110        60
OIR    2025250     91400   22.3700 -110.7800       4.8        34       109        60
OIR    2025250     91400   22.3700 -110.7900       4.9        31       108        60
OIR    2025250     91400   22.3700 -110.8000       5.0        30       105        60
OIR    2025250     91400   22.3700 -110.8100       5.2        28       104        60
OIR    2025250     91400   22.3700 -110.8200       5.5        24       104        60
OIR    2025250     91400   22.3700 -110.8300       4.7        20       103        60
OIR    2025250     91400   22.3700 -110.8400       4.9        20       103        60
OIR    2025250     91400   22.3700 -110.8500       5.2        18       103        60
OIR    2025250     91400   22.3700 -110.8600       5.4        15       104        60
OIR    2025250     91400   22.3700 -110.8700       5.4        12       107        60
OIR    2025250     91400   22.3700 -110.8800       5.1         3       109        60
OIR    2025250     91400   22.3700 -110.8900       4.9       346       110        60
OIR    2025250     91400   22.3700 -110.9000       5.1       328       111        60
OIR    2025250     91400   22.3700 -110.9100       5.4       321       112        60
OIR    2025250     91400   22.3700 -110.9200       5.6       315       114        60
OIR    2025250     91400   22.3700 -110.9300       5.7       312       115        60
OIR    2025250     91400   22.3700 -110.9400       5.8       310       115        60
OIR    2025250     91400   22.3700 -110.9500       5.9       309       115        60
OIR    2025250     91400   22.3700 -110.9600       6.0       307       115        60
OIR    2025250     91400   22.3700 -110.9700       6.3       305       115        60
OIR    2025250     91400   22.3700 -110.9800       6.8       302       116        60
OIR    2025250     91400   22.3700 -110.9900       7.1       301       116        60
OIR    2025250     91400   22.3700 -111.0000       7.5       299       117        60
OIR    2025250     91400   22.3700 -111.0100       7.9       298       121        60
OIR    2025250     91400   22.3700 -111.0200       8.0       296       123        60
OIR    2025250     91400   22.3700 -111.0300       8.2       292       124        60
OIR    2025250     91400   22.3700 -111.0400       8.4       286       125        60
OIR    2025250     91400   22.3700 -111.0500       9.1       273       126        60
OIR    2025250     91400   22.3700 -111.0600       9.6       272       132        60
OIR    2025250     91400   22.3600 -110.6200      25.0        43       132        60
OIR    2025250     91400   22.3600 -110.6300      27.3        47       128        60
OIR    2025250     91400   22.3600 -110.6400      24.7        48       124        60
OIR    2025250     91400   22.3600 -110.6500      13.1        57       122        60
OIR    2025250     91400   22.3600 -110.6600       5.5        65       120        60
OIR    2025250     91400   22.3600 -110.6700       4.2        68       119        60
OIR    2025250     91400   22.3600 -110.7300       4.1        37       112        60
OIR    2025250     91400   22.3600 -110.7400       4.3        37       111        60
OIR    2025250     91400   22.3600 -110.7500       4.5        37       111        60
OIR    2025250     91400   22.3600 -110.7600       4.7        36       111        60
OIR    2025250     91400   22.3600 -110.7700       5.0        34       110        60
OIR    2025250     91400   22.3600 -110.7800       5.1        32       109        60
OIR    2025250     91400   22.3600 -110.7900       5.3        30       108        60
OIR    2025250     91400   22.3600 -110.8000       5.5        27       108        60
OIR    2025250     91400   22.3600 -110.8100       5.9        23       105        60
OIR    2025250     91400   22.3600 -110.8200       6.5        21       104        60
OIR    2025250     91400   22.3600 -110.8300       7.0        19       104        60
OIR    2025250     91400   22.3600 -110.8400       7.1        19       103        60
OIR    2025250     91400   22.3600 -110.8500       6.9        18       103        60
OIR    2025250     91400   22.3600 -110.8600       6.5        17       104        60
OIR    2025250     91400   22.3600 -110.8700       6.3        15       105        60
OIR    2025250     91400   22.3600 -110.8800       6.0        11       109        60
OIR    2025250     91400   22.3600 -110.8900       5.4       357       109        60
OIR    2025250     91400   22.3600 -110.9000       5.2       336       110        60
OIR    2025250     91400   22.3600 -110.9100       5.5       325       111        60
OIR    2025250     91400   22.3600 -110.9200       5.6       318       114        60
OIR    2025250     91400   22.3600 -110.9300       5.8       313       116        60
OIR    2025250     91400   22.3600 -110.9400       5.9       311       116        60
OIR    2025250     91400   22.3600 -110.9500       6.0       310       116        60
OIR    2025250     91400   22.3600 -110.9600       6.2       308       116        60
OIR    2025250     91400   22.3600 -110.9700       6.5       306       116        60
OIR    2025250     91400   22.3600 -110.9800       7.1       303       116        60
OIR    2025250     91400   22.3600 -110.9900       7.5       301       119        60
OIR    2025250     91400   22.3600 -111.0000       7.8       301       121        60
OIR    2025250     91400   22.3600 -111.0100       7.9       300       122        60
OIR    2025250     91400   22.3600 -111.0200       8.0       299       124        60
OIR    2025250     91400   22.3600 -111.0300       8.1       296       125        60
OIR    2025250     91400   22.3600 -111.0400       8.3       292       127        60
OIR    2025250     91400   22.3600 -111.0500       8.8       288       130        60
OIR    2025250     91400   22.3600 -111.0600       9.6       284       138        60
OIR    2025250     91400   22.3500 -110.6200      29.8       358       136        60
OIR    2025250     91400   22.3500 -110.6300      26.8        45       130        60
OIR    2025250     91400   22.3500 -110.6400      22.9        47       124        60
OIR    2025250     91400   22.3500 -110.6500      13.2        50       121        60
OIR    2025250     91400   22.3500 -110.6600       5.0        55       117        60
OIR    2025250     91400   22.3500 -110.6700       4.3        58       116        60
OIR    2025250     91400   22.3500 -110.7100       4.0        40       115        60
OIR    2025250     91400   22.3500 -110.7200       4.2        38       113        60
OIR    2025250     91400   22.3500 -110.7300       4.3        37       111        60
OIR    2025250     91400   22.3500 -110.7400       4.4        36       109        60
OIR    2025250     91400   22.3500 -110.7500       4.6        36       109        60
OIR    2025250     91400   22.3500 -110.7600       5.0        34       109        60
OIR    2025250     91400   22.3500 -110.7700       5.4        32       109        60
OIR    2025250     91400   22.3500 -110.7800       5.6        29       108        60
OIR    2025250     91400   22.3500 -110.7900       5.8        27       108        60
OIR    2025250     91400   22.3500 -110.8000       6.0        24       108        60
OIR    2025250     91400   22.3500 -110.8100       6.5        20       107        60
OIR    2025250     91400   22.3500 -110.8200       6.9        19       105        60
OIR    2025250     91400   22.3500 -110.8300       7.1        19       104        60
OIR    2025250     91400   22.3500 -110.8400       7.2        18       104        60
OIR    2025250     91400   22.3500 -110.8500       7.2        18       104        60
OIR    2025250     91400   22.3500 -110.8600       7.0        17       103        60
OIR    2025250     91400   22.3500 -110.8700       6.8        16       104        60
OIR    2025250     91400   22.3500 -110.8800       6.5        13       107        60
OIR    2025250     91400   22.3500 -110.8900       6.0         4       108        60
OIR    2025250     91400   22.3500 -110.9000       5.5       346       109        60
OIR    2025250     91400   22.3500 -110.9100       5.6       331       110        60
OIR    2025250     91400   22.3500 -110.9200       5.7       323       112        60
OIR    2025250     91400   22.3500 -110.9300       5.8       316       115        60
OIR    2025250     91400   22.3500 -110.9400       6.0       313       116        60
OIR    2025250     91400   22.3500 -110.9500       6.1       311       116        60
OIR    2025250     91400   22.3500 -110.9600       6.3       309       116        60
OIR    2025250     91400   22.3500 -110.9700       6.7       306       116        60
OIR    2025250     91400   22.3500 -110.9800       7.4       303       116        60
OIR    2025250     91400   22.3500 -110.9900       7.8       302       117        60
OIR    2025250     91400   22.3500 -111.0000       7.9       301       121        60
OIR    2025250     91400   22.3500 -111.0100       8.0       301       123        60
OIR    2025250     91400   22.3500 -111.0200       8.0       300       124        60
OIR    2025250     91400   22.3500 -111.0300       8.1       299       126        60
OIR    2025250     91400   22.3500 -111.0400       8.4       298       130        60
OIR    2025250     91400   22.3500 -111.0500       9.7       299       135        60
OIR    2025250     91400   22.3400 -110.6400      20.0        45       127        60
OIR    2025250     91400   22.3400 -110.6500      11.3        49       122        60
OIR    2025250     91400   22.3400 -110.6600       5.2        55       120        60
OIR    2025250     91400   22.3400 -110.6700       4.5        56       119        60
OIR    2025250     91400   22.3400 -110.6800       4.1        53       116        60
OIR    2025250     91400   22.3400 -110.6900       4.0        49       115        60
OIR    2025250     91400   22.3400 -110.7000       4.1        44       114        60
OIR    2025250     91400   22.3400 -110.7100       4.3        40       115        60
OIR    2025250     91400   22.3400 -110.7200       4.4        38       114        60
OIR    2025250     91400   22.3400 -110.7300       4.5        37       111        60
OIR    2025250     91400   22.3400 -110.7400       4.6        35       108        60
OIR    2025250     91400   22.3400 -110.7500       4.9        33       108        60
OIR    2025250     91400   22.3400 -110.7600       5.3        31       108        60
OIR    2025250     91400   22.3400 -110.7700       5.7        28       108        60
OIR    2025250     91400   22.3400 -110.7800       6.1        26       108        60
OIR    2025250     91400   22.3400 -110.7900       6.6        23       107        60
OIR    2025250     91400   22.3400 -110.8000       7.0        19       107        60
OIR    2025250     91400   22.3400 -110.8100       7.1        18       107        60
OIR    2025250     91400   22.3400 -110.8200       7.1        18       107        60
OIR    2025250     91400   22.3400 -110.8300       7.2        18       105        60
OIR    2025250     91400   22.3400 -110.8400       7.3        18       105        60
OIR    2025250     91400   22.3400 -110.8500       7.3        17       104        60
OIR    2025250     91400   22.3400 -110.8600       7.2        17       104        60
OIR    2025250     91400   22.3400 -110.8700       7.0        16       104        60
OIR    2025250     91400   22.3400 -110.8800       6.8        13       105        60
OIR    2025250     91400   22.3400 -110.8900       6.4         6       107        60
OIR    2025250     91400   22.3400 -110.9000       6.0       352       108        60
OIR    2025250     91400   22.3400 -110.9100       5.8       338       110        60
OIR    2025250     91400   22.3400 -110.9200       5.9       328       111        60
OIR    2025250     91400   22.3400 -110.9300       6.0       322       113        60
OIR    2025250     91400   22.3400 -110.9400       6.1       317       115        60
OIR    2025250     91400   22.3400 -110.9500       6.3       313       115        60
OIR    2025250     91400   22.3400 -110.9600       6.5       310       115        60
OIR    2025250     91400   22.3400 -110.9700       7.0       307       116        60
OIR    2025250     91400   22.3400 -110.9800       7.6       304       116        60
OIR    2025250     91400   22.3400 -110.9900       7.8       303       117        60
OIR    2025250     91400   22.3400 -111.0000       8.0       302       120        60
OIR    2025250     91400   22.3400 -111.0100       8.0       301       122        60
OIR    2025250     91400   22.3400 -111.0200       8.1       301       124        60
OIR    2025250     91400   22.3400 -111.0300       8.2       301       126        60
OIR    2025250     91400   22.3400 -111.0400       9.5       305       131        60
OIR    2025250     91400   22.3300 -110.6400      16.7        41       133        60
OIR    2025250     91400   22.3300 -110.6500       9.9        50       122        60
OIR    2025250     91400   22.3300 -110.6600       6.1        53       122        60
OIR    2025250     91400   22.3300 -110.6700       4.7        53       121        60
OIR    2025250     91400   22.3300 -110.6800       4.4        50       120        60
OIR    2025250     91400   22.3300 -110.6900       4.2        46       117        60
OIR    2025250     91400   22.3300 -110.7000       4.3        42       116        60
OIR    2025250     91400   22.3300 -110.7100       4.4        39       116        60
OIR    2025250     91400   22.3300 -110.7200       4.5        37       115        60
OIR    2025250     91400   22.3300 -110.7300       4.6        36       112        60
OIR    2025250     91400   22.3300 -110.7400       4.9        33       109        60
OIR    2025250     91400   22.3300 -110.7500       5.2        31       109        60
OIR    2025250     91400   22.3300 -110.7600       5.6        28       110        60
OIR    2025250     91400   22.3300 -110.7700       6.0        25       109        60
OIR    2025250     91400   22.3300 -110.7800       6.5        22       108        60
OIR    2025250     91400   22.3300 -110.7900       7.1        19       107        60
OIR    2025250     91400   22.3300 -110.8000       7.4        17       107        60
OIR    2025250     91400   22.3300 -110.8100       7.5        16       107        60
OIR    2025250     91400   22.3300 -110.8200       7.5        16       107        60
OIR    2025250     91400   22.3300 -110.8300       7.4        16       107        60
OIR    2025250     91400   22.3300 -110.8400       7.4        16       107        60
OIR    2025250     91400   22.3300 -110.8500       7.4        16       107        60
OIR    2025250     91400   22.3300 -110.8600       7.3        16       107        60
OIR    2025250     91400   22.3300 -110.8700       7.2        15       107        60
OIR    2025250     91400   22.3300 -110.8800       7.0        13       105        60
OIR    2025250     91400   22.3300 -110.8900       6.6         7       105        60
OIR    2025250     91400   22.3300 -110.9000       6.1       355       108        60
OIR    2025250     91400   22.3300 -110.9100       5.9       342       109        60
OIR    2025250     91400   22.3300 -110.9200       6.0       331       111        60
OIR    2025250     91400   22.3300 -110.9300       6.1       324       112        60
OIR    2025250     91400   22.3300 -110.9400       6.3       320       114        60
OIR    2025250     91400   22.3300 -110.9500       6.4       316       115        60
OIR    2025250     91400   22.3300 -110.9600       6.7       312       116        60
OIR    2025250     91400   22.3300 -110.9700       7.2       308       116        60
OIR    2025250     91400   22.3300 -110.9800       7.8       305       116        60
OIR    2025250     91400   22.3300 -110.9900       8.0       304       117        60
OIR    2025250     91400   22.3300 -111.0000       8.1       303       120        60
OIR    2025250     91400   22.3300 -111.0100       8.1       302       122        60
OIR    2025250     91400   22.3300 -111.0200       8.2       302       125        60
OIR    2025250     91400   22.3300 -111.0300       9.1       304       129        60
OIR    2025250     91400   22.3300 -111.0400      10.1       308       134        60
OIR    2025250     91400   22.3200 -110.6500      11.0        47       121        60
OIR    2025250     91400   22.3200 -110.6600       7.8        52       120        60
OIR    2025250     91400   22.3200 -110.6700       5.4        52       120        60
OIR    2025250     91400   22.3200 -110.6800       4.8        49       117        60
OIR    2025250     91400   22.3200 -110.6900       4.6        44       116        60
OIR    2025250     91400   22.3200 -110.7000       4.5        40       115        60
OIR    2025250     91400   22.3200 -110.7100       4.6        37       114        60
OIR    2025250     91400   22.3200 -110.7200       4.8        35       113        60
OIR    2025250     91400   22.3200 -110.7300       5.0        33       111        60
OIR    2025250     91400   22.3200 -110.7400       5.2        31       109        60
OIR    2025250     91400   22.3200 -110.7500       5.7        27       108        60
OIR    2025250     91400   22.3200 -110.7600       6.2        24       109        60
OIR    2025250     91400   22.3200 -110.7700       6.7        20       110        60
OIR    2025250     91400   22.3200 -110.7800       7.2        18       108        60
OIR    2025250     91400   22.3200 -110.7900       7.5        16       107        60
OIR    2025250     91400   22.3200 -110.8000       7.6        15       105        60
OIR    2025250     91400   22.3200 -110.8100       7.7        15       105        60
OIR    2025250     91400   22.3200 -110.8200       7.7        15       107        60
OIR    2025250     91400   22.3200 -110.8300       7.7        15       108        60
OIR    2025250     91400   22.3200 -110.8400       7.6        15       109        60
OIR    2025250     91400   22.3200 -110.8500       7.5        15       110        60
OIR    2025250     91400   22.3200 -110.8600       7.4        14       110        60
OIR    2025250     91400   22.3200 -110.8700       7.3        13       110        60
OIR    2025250     91400   22.3200 -110.8800       7.2        12       108        60
OIR    2025250     91400   22.3200 -110.8900       6.9         7       107        60
OIR    2025250     91400   22.3200 -110.9000       6.4       357       107        60
OIR    2025250     91400   22.3200 -110.9100       6.1       344       109        60
OIR    2025250     91400   22.3200 -110.9200       6.2       333       110        60
OIR    2025250     91400   22.3200 -110.9300       6.3       326       111        60
OIR    2025250     91400   22.3200 -110.9400       6.5       322       113        60
OIR    2025250     91400   22.3200 -110.9500       6.7       318       115        60
OIR    2025250     91400   22.3200 -110.9600       6.9       314       116        60
OIR    2025250     91400   22.3200 -110.9700       7.4       310       117        60
OIR    2025250     91400   22.3200 -110.9800       8.0       306       117        60
OIR    2025250     91400   22.3200 -110.9900       8.2       305       119        60
OIR    2025250     91400   22.3200 -111.0000       8.3       304       121        60
OIR    2025250     91400   22.3200 -111.0100       8.4       303       123        60
OIR    2025250     91400   22.3200 -111.0200       9.0       304       128        60
OIR    2025250     91400   22.3200 -111.0300       9.8       306       133        60
OIR    2025250     91400   22.3200 -111.0400      10.3       309       139        60
OIR    2025250     91400   22.3200 -114.4300      15.7       130       157        60
OIR    2025250     91400   22.3200 -114.4400      15.0       131       156        60
OIR    2025250     91400   22.3100 -110.6500      16.2        52       124        60
OIR    2025250     91400   22.3100 -110.6600       9.7        61       117        60
OIR    2025250     91400   22.3100 -110.6700       6.0        55       116        60
OIR    2025250     91400   22.3100 -110.6800       5.2        48       115        60
OIR    2025250     91400   22.3100 -110.6900       4.9        41       113        60
OIR    2025250     91400   22.3100 -110.7000       4.9        36       111        60
OIR    2025250     91400   22.3100 -110.7100       5.0        33       109        60
OIR    2025250     91400   22.3100 -110.7200       5.1        32       107        60
OIR    2025250     91400   22.3100 -110.7300       5.3        30       107        60
OIR    2025250     91400   22.3100 -110.7400       5.8        26       107        60
OIR    2025250     91400   22.3100 -110.7500       6.6        21       107        60
OIR    2025250     91400   22.3100 -110.7600       7.2        18       107        60
OIR    2025250     91400   22.3100 -110.7700       7.5        16       108        60
OIR    2025250     91400   22.3100 -110.7800       7.6        15       105        60
OIR    2025250     91400   22.3100 -110.7900       7.7        15       104        60
OIR    2025250     91400   22.3100 -110.8000       7.7        15       104        60
OIR    2025250     91400   22.3100 -110.8100       7.7        15       104        60
OIR    2025250     91400   22.3100 -110.8200       7.7        15       104        60
OIR    2025250     91400   22.3100 -110.8300       7.7        15       105        60
OIR    2025250     91400   22.3100 -110.8400       7.7        14       107        60
OIR    2025250     91400   22.3100 -110.8500       7.6        14       108        60
OIR    2025250     91400   22.3100 -110.8600       7.5        13       108        60
OIR    2025250     91400   22.3100 -110.8700       7.4        12       109        60
OIR    2025250     91400   22.3100 -110.8800       7.3        11       108        60
OIR    2025250     91400   22.3100 -110.8900       7.0         6       107        60
OIR    2025250     91400   22.3100 -110.9000       6.6       356       107        60
OIR    2025250     91400   22.3100 -110.9100       6.3       343       109        60
OIR    2025250     91400   22.3100 -110.9200       6.4       333       111        60
OIR    2025250     91400   22.3100 -110.9300       6.5       327       111        60
OIR    2025250     91400   22.3100 -110.9400       6.6       323       112        60
OIR    2025250     91400   22.3100 -110.9500       6.8       319       113        60
OIR    2025250     91400   22.3100 -110.9600       7.1       315       116        60
OIR    2025250     91400   22.3100 -110.9700       7.4       313       117        60
OIR    2025250     91400   22.3100 -110.9800       8.2       307       119        60
OIR    2025250     91400   22.3100 -110.9900       8.4       306       119        60
OIR    2025250     91400   22.3100 -111.0000       8.6       305       122        60
OIR    2025250     91400   22.3100 -111.0100       9.0       305       126        60
OIR    2025250     91400   22.3100 -111.0200       9.6       306       131        60
OIR    2025250     91400   22.3100 -114.4400      15.8       133       147        60
OIR    2025250     91400   22.3000 -109.6700      10.3       354       137        60
OIR    2025250     91400   22.3000 -110.6500      22.7        59       135        60
OIR    2025250     91400   22.3000 -110.6600      14.0        67       122        60
OIR    2025250     91400   22.3000 -110.6700       6.3        56       116        60
OIR    2025250     91400   22.3000 -110.6800       5.6        46       114        60
OIR    2025250     91400   22.3000 -110.6900       5.5        36       112        60
OIR    2025250     91400   22.3000 -110.7000       5.8        30       110        60
OIR    2025250     91400   22.3000 -110.7100       6.2        25       109        60
OIR    2025250     91400   22.3000 -110.7200       6.7        22       107        60
OIR    2025250     91400   22.3000 -110.7300       7.1        20       105        60
OIR    2025250     91400   22.3000 -110.7400       7.3        18       105        60
OIR    2025250     91400   22.3000 -110.7500       7.5        17       105        60
OIR    2025250     91400   22.3000 -110.7600       7.6        16       105        60
OIR    2025250     91400   22.3000 -110.7700       7.7        15       105        60
OIR    2025250     91400   22.3000 -110.7800       7.7        15       105        60
OIR    2025250     91400   22.3000 -110.7900       7.7        15       104        60
OIR    2025250     91400   22.3000 -110.8000       7.7        15       103        60
OIR    2025250     91400   22.3000 -110.8100       7.7        15       103        60
OIR    2025250     91400   22.3000 -110.8200       7.7        14       103        60
OIR    2025250     91400   22.3000 -110.8300       7.7        14       104        60
OIR    2025250     91400   22.3000 -110.8400       7.7        14       104        60
OIR    2025250     91400   22.3000 -110.8500       7.7        13       104        60
OIR    2025250     91400   22.3000 -110.8600       7.6        13       105        60
OIR    2025250     91400   22.3000 -110.8700       7.5        12       108        60
OIR    2025250     91400   22.3000 -110.8800       7.4        10       107        60
OIR    2025250     91400   22.3000 -110.8900       7.1         4       107        60
OIR    2025250     91400   22.3000 -110.9000       6.7       353       107        60
OIR    2025250     91400   22.3000 -110.9100       6.5       341       109        60
OIR    2025250     91400   22.3000 -110.9200       6.5       331       112        60
OIR    2025250     91400   22.3000 -110.9300       6.6       326       111        60
OIR    2025250     91400   22.3000 -110.9400       6.7       323       111        60
OIR    2025250     91400   22.3000 -110.9500       6.8       320       111        60
OIR    2025250     91400   22.3000 -110.9600       7.2       315       114        60
OIR    2025250     91400   22.3000 -110.9700       7.5       313       116        60
OIR    2025250     91400   22.3000 -110.9800       8.8       309       117        60
OIR    2025250     91400   22.3000 -110.9900       8.9       307       119        60
OIR    2025250     91400   22.3000 -111.0000       9.1       307       122        60
OIR    2025250     91400   22.3000 -111.0100      10.2       308       129        60
OIR    2025250     91400   22.3000 -111.0200      10.3       308       136        60
OIR    2025250     91400   22.2900 -109.6700      11.8         0       138        60
OIR    2025250     91400   22.2900 -110.6600      20.8        72       129        60
OIR    2025250     91400   22.2900 -110.6700       6.9        63       122        60
OIR    2025250     91400   22.2900 -110.6800       5.8        41       115        60
OIR    2025250     91400   22.2900 -110.6900       5.9        31       114        60
OIR    2025250     91400   22.2900 -110.7000       6.2        26       112        60
OIR    2025250     91400   22.2900 -110.7100       6.6        24       111        60
OIR    2025250     91400   22.2900 -110.7200       6.9        21       111        60
OIR    2025250     91400   22.2900 -110.7300       7.2        19       111        60
OIR    2025250     91400   22.2900 -110.7400       7.5        17       110        60
OIR    2025250     91400   22.2900 -110.7500       7.7        16       109        60
OIR    2025250     91400   22.2900 -110.7600       7.7        15       109        60
OIR    2025250     91400   22.2900 -110.7700       7.8        15       109        60
OIR    2025250     91400   22.2900 -110.7800       7.8        15       108        60
OIR    2025250     91400   22.2900 -110.7900       7.8        15       105        60
OIR    2025250     91400   22.2900 -110.8000       7.8        15       104        60
OIR    2025250     91400   22.2900 -110.8100       7.7        14       103        60
OIR    2025250     91400   22.2900 -110.8200       7.7        14       103        60
OIR    2025250     91400   22.2900 -110.8300       7.7        14       103        60
OIR    2025250     91400   22.2900 -110.8400       7.7        14       104        60
OIR    2025250     91400   22.2900 -110.8500       7.7        13       104        60
OIR    2025250     91400   22.2900 -110.8600       7.7        12       105        60
OIR    2025250     91400   22.2900 -110.8700       7.6        11       107        60
OIR    2025250     91400   22.2900 -110.8800       7.5         9       107        60
OIR    2025250     91400   22.2900 -110.8900       7.2         3       107        60
OIR    2025250     91400   22.2900 -110.9000       6.8       350       107        60
OIR    2025250     91400   22.2900 -110.9100       6.6       339       109        60
OIR    2025250     91400   22.2900 -110.9200       6.6       330       111        60
OIR    2025250     91400   22.2900 -110.9300       6.6       325       111        60
OIR    2025250     91400   22.2900 -110.9400       6.6       322       111        60
OIR    2025250     91400   22.2900 -110.9500       6.8       320       111        60
OIR    2025250     91400   22.2900 -110.9600       7.1       317       114        60
OIR    2025250     91400   22.2900 -110.9700       7.8       313       117        60
OIR    2025250     91400   22.2900 -110.9800       9.3       311       120        60
OIR    2025250     91400   22.2900 -110.9900       9.7       310       122        60
OIR    2025250     91400   22.2900 -111.0000       9.7       310       125        60
OIR    2025250     91400   22.2900 -111.0100      11.1       310       134        60
OIR    2025250     91400   22.2800 -110.6700       9.3        66       130        60
OIR    2025250     91400   22.2800 -110.6800       5.9        32       119        60
OIR    2025250     91400   22.2800 -110.6900       6.2        27       115        60
OIR    2025250     91400   22.2800 -110.7000       6.4        25       113        60
OIR    2025250     91400   22.2800 -110.7100       6.8        23       111        60
OIR    2025250     91400   22.2800 -110.7200       7.1        21       113        60
OIR    2025250     91400   22.2800 -110.7300       7.4        19       114        60
OIR    2025250     91400   22.2800 -110.7400       7.7        17       113        60
OIR    2025250     91400   22.2800 -110.7500       7.8        16       112        60
OIR    2025250     91400   22.2800 -110.7600       7.8        15       111        60
OIR    2025250     91400   22.2800 -110.7700       7.8        15       111        60
OIR    2025250     91400   22.2800 -110.7800       7.8        15       111        60
OIR    2025250     91400   22.2800 -110.7900       7.8        15       108        60
OIR    2025250     91400   22.2800 -110.8000       7.8        14       104        60
OIR    2025250     91400   22.2800 -110.8100       7.8        14       103        60
OIR    2025250     91400   22.2800 -110.8200       7.8        14       103        60
OIR    2025250     91400   22.2800 -110.8300       7.8        13       103        60
OIR    2025250     91400   22.2800 -110.8400       7.8        13       104        60
OIR    2025250     91400   22.2800 -110.8500       7.8        12       104        60
OIR    2025250     91400   22.2800 -110.8600       7.7        12       105        60
OIR    2025250     91400   22.2800 -110.8700       7.7        10       105        60
OIR    2025250     91400   22.2800 -110.8800       7.6         8       107        60
OIR    2025250     91400   22.2800 -110.8900       7.3         2       107        60
OIR    2025250     91400   22.2800 -110.9000       6.8       349       107        60
OIR    2025250     91400   22.2800 -110.9100       6.6       338       108        60
OIR    2025250     91400   22.2800 -110.9200       6.4       330       109        60
OIR    2025250     91400   22.2800 -110.9300       6.4       325       110        60
OIR    2025250     91400   22.2800 -110.9400       6.5       322       112        60
OIR    2025250     91400   22.2800 -110.9500       6.7       320       114        60
OIR    2025250     91400   22.2800 -110.9600       7.1       317       116        60
OIR    2025250     91400   22.2800 -110.9700       7.8       314       121        60
OIR    2025250     91400   22.2800 -110.9800       9.7       312       125        60
OIR    2025250     91400   22.2800 -110.9900      10.0       312       128        60
OIR    2025250     91400   22.2800 -111.0000      12.2       314       131        60
OIR    2025250     91400   22.2700 -109.6800      10.5       354       138        60
OIR    2025250     91400   22.2700 -110.6800       6.0        29       126        60
OIR    2025250     91400   22.2700 -110.6900       6.2        27       117        60
OIR    2025250     91400   22.2700 -110.7000       6.6        26       114        60
OIR    2025250     91400   22.2700 -110.7100       7.0        24       110        60
OIR    2025250     91400   22.2700 -110.7200       7.3        21       111        60
OIR    2025250     91400   22.2700 -110.7300       7.5        19       112        60
OIR    2025250     91400   22.2700 -110.7400       7.7        17       113        60
OIR    2025250     91400   22.2700 -110.7500       7.8        16       113        60
OIR    2025250     91400   22.2700 -110.7600       7.8        15       114        60
OIR    2025250     91400   22.2700 -110.7700       7.8        15       112        60
OIR    2025250     91400   22.2700 -110.7800       7.8        15       111        60
OIR    2025250     91400   22.2700 -110.7900       7.8        15       108        60
OIR    2025250     91400   22.2700 -110.8000       7.8        14       105        60
OIR    2025250     91400   22.2700 -110.8100       7.8        14       103        60
OIR    2025250     91400   22.2700 -110.8200       7.9        13       103        60
OIR    2025250     91400   22.2700 -110.8300       7.9        13       103        60
OIR    2025250     91400   22.2700 -110.8400       7.9        12       104        60
OIR    2025250     91400   22.2700 -110.8500       7.9        12       104        60
OIR    2025250     91400   22.2700 -110.8600       7.9        11       105        60
OIR    2025250     91400   22.2700 -110.8700       7.8         9       107        60
OIR    2025250     91400   22.2700 -110.8800       7.7         7       108        60
OIR    2025250     91400   22.2700 -110.8900       7.3         1       108        60
OIR    2025250     91400   22.2700 -110.9000       6.8       349       108        60
OIR    2025250     91400   22.2700 -110.9100       6.4       339       109        60
OIR    2025250     91400   22.2700 -110.9200       6.3       330       109        60
OIR    2025250     91400   22.2700 -110.9300       6.3       324       110        60
OIR    2025250     91400   22.2700 -110.9400       6.4       321       113        60
OIR    2025250     91400   22.2700 -110.9500       6.7       319       116        60
OIR    2025250     91400   22.2700 -110.9600       7.2       316       119        60
OIR    2025250     91400   22.2700 -110.9700       8.0       314       124        60
OIR    2025250     91400   22.2700 -110.9800       9.8       310       129        60
OIR    2025250     91400   22.2700 -110.9900       9.8       311       134        60
OIR    2025250     91400   22.2600 -109.6800      11.4       357       136        60
OIR    2025250     91400   22.2600 -110.6800       7.8        32       134        60
OIR    2025250     91400   22.2600 -110.6900       6.9        30       121        60
OIR    2025250     91400   22.2600 -110.7000       7.0        28       116        60
OIR    2025250     91400   22.2600 -110.7100       7.3        25       113        60
OIR    2025250     91400   22.2600 -110.7200       7.5        22       111        60
OIR    2025250     91400   22.2600 -110.7300       7.6        19       112        60
OIR    2025250     91400   22.2600 -110.7400       7.8        16       113        60
OIR    2025250     91400   22.2600 -110.7500       7.9        16       114        60
OIR    2025250     91400   22.2600 -110.7600       7.9        15       116        60
OIR    2025250     91400   22.2600 -110.7700       7.9        15       114        60
OIR    2025250     91400   22.2600 -110.7800       7.9        15       111        60
OIR    2025250     91400   22.2600 -110.7900       7.9        14       108        60
OIR    2025250     91400   22.2600 -110.8000       7.9        14       105        60
OIR    2025250     91400   22.2600 -110.8100       8.0        13       103        60
OIR    2025250     91400   22.2600 -110.8200       8.0        12       103        60
OIR    2025250     91400   22.2600 -110.8300       8.1        12       103        60
OIR    2025250     91400   22.2600 -110.8400       8.1        11       103        60
OIR    2025250     91400   22.2600 -110.8500       8.1        11       104        60
OIR    2025250     91400   22.2600 -110.8600       8.1        10       104        60
OIR    2025250     91400   22.2600 -110.8700       8.0         9       107        60
OIR    2025250     91400   22.2600 -110.8800       7.8         7       110        60
OIR    2025250     91400   22.2600 -110.8900       7.4         1       110        60
OIR    2025250     91400   22.2600 -110.9000       6.6       350       109        60
OIR    2025250     91400   22.2600 -110.9100       6.2       340       109        60
OIR    2025250     91400   22.2600 -110.9200       6.0       330       111        60
OIR    2025250     91400   22.2600 -110.9300       6.1       324       112        60
OIR    2025250     91400   22.2600 -110.9400       6.3       320       114        60
OIR    2025250     91400   22.2600 -110.9500       6.8       316       116        60
OIR    2025250     91400   22.2600 -110.9600       7.5       312       120        60
OIR    2025250     91400   22.2600 -110.9700       8.7       308       124        60
OIR    2025250     91400   22.2600 -110.9800       9.6       305       129        60
OIR    2025250     91400   22.2500 -110.6900       7.0        31       126        60
OIR    2025250     91400   22.2500 -110.7000       7.1        28       120        60
OIR    2025250     91400   22.2500 -110.7100       7.6        27       116        60
OIR    2025250     91400   22.2500 -110.7200       7.6        23       115        60
OIR    2025250     91400   22.2500 -110.7300       7.7        19       115        60
OIR    2025250     91400   22.2500 -110.7400       7.8        16       115        60
OIR    2025250     91400   22.2500 -110.7500       7.9        16       115        60
OIR    2025250     91400   22.2500 -110.7600       7.9        15       116        60
OIR    2025250     91400   22.2500 -110.7700       7.9        15       114        60
OIR    2025250     91400   22.2500 -110.7800       8.0        15       111        60
OIR    2025250     91400   22.2500 -110.7900       8.1        14       109        60
OIR    2025250     91400   22.2500 -110.8000       8.1        13       107        60
OIR    2025250     91400   22.2500 -110.8100       8.2        12       104        60
OIR    2025250     91400   22.2500 -110.8200       8.2        11       104        60
OIR    2025250     91400   22.2500 -110.8300       8.3        11       105        60
OIR    2025250     91400   22.2500 -110.8400       8.4        11       105        60
OIR    2025250     91400   22.2500 -110.8500       8.4        10       107        60
OIR    2025250     91400   22.2500 -110.8600       8.3         9       108        60
OIR    2025250     91400   22.2500 -110.8700       8.2         8       109        60
OIR    2025250     91400   22.2500 -110.8800       8.0         6       110        60
OIR    2025250     91400   22.2500 -110.8900       7.6         1       111        60
OIR    2025250     91400   22.2500 -110.9000       6.5       351       111        60
OIR    2025250     91400   22.2500 -110.9100       5.8       341       111        60
OIR    2025250     91400   22.2500 -110.9200       5.7       330       113        60
OIR    2025250     91400   22.2500 -110.9300       5.9       324       115        60
OIR    2025250     91400   22.2500 -110.9400       6.3       317       116        60
OIR    2025250     91400   22.2500 -110.9500       7.0       311       119        60
OIR    2025250     91400   22.2500 -110.9600       7.8       305       122        60
OIR    2025250     91400   22.2500 -110.9700       9.7       298       127        60
OIR    2025250     91400   22.2500 -110.9800       9.8       297       132        60
OIR    2025250     91400   22.2400 -110.6900       7.6        30       134        60
OIR    2025250     91400   22.2400 -110.7000       7.7        30       123        60
OIR    2025250     91400   22.2400 -110.7100       7.7        28       121        60
OIR    2025250     91400   22.2400 -110.7200       7.7        25       119        60
OIR    2025250     91400   22.2400 -110.7300       7.8        19       117        60
OIR    2025250     91400   22.2400 -110.7400       7.9        17       117        60
OIR    2025250     91400   22.2400 -110.7500       7.9        16       116        60
OIR    2025250     91400   22.2400 -110.7600       8.0        15       116        60
OIR    2025250     91400   22.2400 -110.7700       8.1        15       115        60
OIR    2025250     91400   22.2400 -110.7800       8.3        14       112        60
OIR    2025250     91400   22.2400 -110.7900       8.4        14       109        60
OIR    2025250     91400   22.2400 -110.8000       8.5        13       108        60
OIR    2025250     91400   22.2400 -110.8100       8.4        11       107        60
OIR    2025250     91400   22.2400 -110.8200       8.5        11       105        60
OIR    2025250     91400   22.2400 -110.8300       8.5        10       108        60
OIR    2025250     91400   22.2400 -110.8400       8.6        10       109        60
OIR    2025250     91400   22.2400 -110.8500       8.6        10       110        60
OIR    2025250     91400   22.2400 -110.8600       8.5         9       111        60
OIR    2025250     91400   22.2400 -110.8700       8.5         8       112        60
OIR    2025250     91400   22.2400 -110.8800       8.3         6       112        60
OIR    2025250     91400   22.2400 -110.8900       7.9         1       112        60
OIR    2025250     91400   22.2400 -110.9000       7.0       354       113        60
OIR    2025250     91400   22.2400 -110.9100       6.0       342       114        60
OIR    2025250     91400   22.2400 -110.9200       5.6       330       116        60
OIR    2025250     91400   22.2400 -110.9300       5.8       322       117        60
OIR    2025250     91400   22.2400 -110.9400       6.3       313       120        60
OIR    2025250     91400   22.2400 -110.9500       7.2       305       122        60
OIR    2025250     91400   22.2400 -110.9600       8.6       296       124        60
OIR    2025250     91400   22.2400 -110.9700       9.7       293       132        60
OIR    2025250     91400   22.2300 -110.7000       7.8        31       129        60
OIR    2025250     91400   22.2300 -110.7100       7.8        30       125        60
OIR    2025250     91400   22.2300 -110.7200       7.7        26       121        60
OIR    2025250     91400   22.2300 -110.7300       7.8        20       119        60
OIR    2025250     91400   22.2300 -110.7400       7.9        17       119        60
OIR    2025250     91400   22.2300 -110.7500       7.9        16       116        60
OIR    2025250     91400   22.2300 -110.7600       8.3        15       114        60
OIR    2025250     91400   22.2300 -110.7700       9.0        13       112        60
OIR    2025250     91400   22.2300 -110.7800       9.3        13       111        60
OIR    2025250     91400   22.2300 -110.7900       9.5        12       109        60
OIR    2025250     91400   22.2300 -110.8000       9.3        11       108        60
OIR    2025250     91400   22.2300 -110.8100       8.9        11       107        60
OIR    2025250     91400   22.2300 -110.8200       8.7        10       105        60
OIR    2025250     91400   22.2300 -110.8300       8.7        10       107        60
OIR    2025250     91400   22.2300 -110.8400       8.7        10       108        60
OIR    2025250     91400   22.2300 -110.8500       8.7        10       110        60
OIR    2025250     91400   22.2300 -110.8600       8.7         9       111        60
OIR    2025250     91400   22.2300 -110.8700       8.7         8       113        60
OIR    2025250     91400   22.2300 -110.8800       8.6         6       113        60
OIR    2025250     91400   22.2300 -110.8900       8.3       360       113        60
OIR    2025250     91400   22.2300 -110.9000       7.7       353       115        60
OIR    2025250     91400   22.2300 -110.9100       6.7       343       116        60
OIR    2025250     91400   22.2300 -110.9200       6.1       333       119        60
OIR    2025250     91400   22.2300 -110.9300       6.0       323       121        60
OIR    2025250     91400   22.2300 -110.9400       6.5       310       123        60
OIR    2025250     91400   22.2300 -110.9500       8.1       298       125        60
OIR    2025250     91400   22.2300 -110.9600       9.3       291       126        60
OIR    2025250     91400   22.2300 -110.9700       9.6       290       133        60
OIR    2025250     91400   22.2200 -110.7000       7.7        31       138        60
OIR    2025250     91400   22.2200 -110.7100       7.6        30       130        60
OIR    2025250     91400   22.2200 -110.7200       7.7        26       124        60
OIR    2025250     91400   22.2200 -110.7300       8.5        20       121        60
OIR    2025250     91400   22.2200 -110.7400       9.8        17       120        60
OIR    2025250     91400   22.2200 -110.7500      10.7        16       117        60
OIR    2025250     91400   22.2200 -110.7600      11.1        14       114        60
OIR    2025250     91400   22.2200 -110.7700      11.4        13       109        60
OIR    2025250     91400   22.2200 -110.7800      11.5        11       108        60
OIR    2025250     91400   22.2200 -110.7900      11.2        10       109        60
OIR    2025250     91400   22.2200 -110.8000      10.9         9       109        60
OIR    2025250     91400   22.2200 -110.8100      10.6         9       107        60
OIR    2025250     91400   22.2200 -110.8200      10.2         9       105        60
OIR    2025250     91400   22.2200 -110.8300       9.6         9       105        60
OIR    2025250     91400   22.2200 -110.8400       9.1        10       107        60
OIR    2025250     91400   22.2200 -110.8500       9.0        10       108        60
OIR    2025250     91400   22.2200 -110.8600       9.0         9       110        60
OIR    2025250     91400   22.2200 -110.8700       9.0         8       111        60
OIR    2025250     91400   22.2200 -110.8800       9.0         5       113        60
OIR    2025250     91400   22.2200 -110.8900       9.3       358       115        60
OIR    2025250     91400   22.2200 -110.9000       8.7       352       116        60
OIR    2025250     91400   22.2200 -110.9100       7.8       345       120        60
OIR    2025250     91400   22.2200 -110.9200       6.7       334       124        60
OIR    2025250     91400   22.2200 -110.9300       6.3       324       124        60
OIR    2025250     91400   22.2200 -110.9400       6.6       310       125        60
OIR    2025250     91400   22.2200 -110.9500       7.9       297       126        60
OIR    2025250     91400   22.2200 -110.9600       9.2       289       129        60
OIR    2025250     91400   22.2200 -110.9700       9.8       288       132        60
OIR    2025250     91400   22.2100 -108.7200      10.2         6       137        60
OIR    2025250     91400   22.2100 -108.7300      10.5         2       138        60
OIR    2025250     91400   22.2100 -108.7500      11.7       347       138        60
OIR    2025250     91400   22.2100 -108.7600      11.7       323       137        60
OIR    2025250     91400   22.2100 -110.7100       7.4        29       137        60
OIR    2025250     91400   22.2100 -110.7200       7.8        25       132        60
OIR    2025250     91400   22.2100 -110.7300       8.6        20       128        60
OIR    2025250     91400   22.2100 -110.7400      10.1        17       124        60
OIR    2025250     91400   22.2100 -110.7500      11.3        16       120        60
OIR    2025250     91400   22.2100 -110.7600      12.3        14       116        60
OIR    2025250     91400   22.2100 -110.7700      13.3        12       112        60
OIR    2025250     91400   22.2100 -110.7800      13.4        10       110        60
OIR    2025250     91400   22.2100 -110.7900      12.7         9       110        60
OIR    2025250     91400   22.2100 -110.8000      12.1         9       110        60
OIR    2025250     91400   22.2100 -110.8100      11.7         9       110        60
OIR    2025250     91400   22.2100 -110.8200      11.3         9       109        60
OIR    2025250     91400   22.2100 -110.8300      10.7         9       109        60
OIR    2025250     91400   22.2100 -110.8400      10.1        10       109        60
OIR    2025250     91400   22.2100 -110.8500       9.4        10       109        60
OIR    2025250     91400   22.2100 -110.8600       9.3         9       110        60
OIR    2025250     91400   22.2100 -110.8700       9.5         8       113        60
OIR    2025250     91400   22.2100 -110.8800       9.8         4       115        60
OIR    2025250     91400   22.2100 -110.8900      10.0       358       116        60
OIR    2025250     91400   22.2100 -110.9000       9.5       354       119        60
OIR    2025250     91400   22.2100 -110.9100       8.7       347       123        60
OIR    2025250     91400   22.2100 -110.9200       7.6       338       126        60
OIR    2025250     91400   22.2100 -110.9300       6.9       327       128        60
OIR    2025250     91400   22.2100 -110.9400       7.0       312       129        60
OIR    2025250     91400   22.2100 -110.9500       7.6       300       129        60
OIR    2025250     91400   22.2100 -110.9600       8.8       290       131        60
OIR    2025250     91400   22.2100 -110.9700       9.9       287       134        60
OIR    2025250     91400   22.2000 -108.7200      10.6         6       137        60
OIR    2025250     91400   22.2000 -108.7300      12.0       360       138        60
OIR    2025250     91400   22.2000 -108.7500      13.1       344       139        60
OIR    2025250     91400   22.2000 -108.7600      12.9       322       136        60
OIR    2025250     91400   22.2000 -108.7700      13.1       309       136        60
OIR    2025250     91400   22.2000 -110.7300       8.9        21       137        60
OIR    2025250     91400   22.2000 -110.7400      10.1        17       129        60
OIR    2025250     91400   22.2000 -110.7500      11.6        15       123        60
OIR    2025250     91400   22.2000 -110.7600      13.3        12       116        60
OIR    2025250     91400   22.2000 -110.7700      14.9        10       114        60
OIR    2025250     91400   22.2000 -110.7800      15.2         9       111        60
OIR    2025250     91400   22.2000 -110.7900      14.1         8       111        60
OIR    2025250     91400   22.2000 -110.8000      13.3         8       112        60
OIR    2025250     91400   22.2000 -110.8100      13.1         9       112        60
OIR    2025250     91400   22.2000 -110.8200      12.8         9       113        60
OIR    2025250     91400   22.2000 -110.8300      12.5        10       113        60
OIR    2025250     91400   22.2000 -110.8400      12.3        10       112        60
OIR    2025250     91400   22.2000 -110.8500      12.1         9       111        60
OIR    2025250     91400   22.2000 -110.8600      11.9         9       112        60
OIR    2025250     91400   22.2000 -110.8700      11.3         7       116        60
OIR    2025250     91400   22.2000 -110.8800      11.0         4       117        60
OIR    2025250     91400   22.2000 -110.8900      11.0         0       120        60
OIR    2025250     91400   22.2000 -110.9000      10.5       357       122        60
OIR    2025250     91400   22.2000 -110.9100       9.7       351       125        60
OIR    2025250     91400   22.2000 -110.9200       8.8       345       128        60
OIR    2025250     91400   22.2000 -110.9300       8.0       335       131        60
OIR    2025250     91400   22.2000 -110.9400       7.8       321       133        60
OIR    2025250     91400   22.2000 -110.9500       8.1       309       136        60
OIR    2025250     91400   22.2000 -110.9600       8.8       297       137        60
OIR    2025250     91400   22.2000 -110.9700       9.2       289       138        60
OIR    2025250     91400   22.1900 -108.7600       9.8       317       138        60
OIR    2025250     91400   22.1900 -108.7700      11.4       303       135        60
OIR    2025250     91400   22.1900 -110.7500      12.4        15       134        60
OIR    2025250     91400   22.1900 -110.7600      14.3        10       126        60
OIR    2025250     91400   22.1900 -110.7700      17.2         6       121        60
OIR    2025250     91400   22.1900 -110.7800      17.2         6       115        60
OIR    2025250     91400   22.1900 -110.7900      15.1         6       115        60
OIR    2025250     91400   22.1900 -110.8000      13.6         8       115        60
OIR    2025250     91400   22.1900 -110.8100      13.9         9       115        60
OIR    2025250     91400   22.1900 -110.8200      14.0        10       115        60
OIR    2025250     91400   22.1900 -110.8300      13.8        10       116        60
OIR    2025250     91400   22.1900 -110.8400      13.7         9       115        60
OIR    2025250     91400   22.1900 -110.8500      13.5         9       114        60
OIR    2025250     91400   22.1900 -110.8600      13.2         9       115        60
OIR    2025250     91400   22.1900 -110.8700      13.0         8       117        60
OIR    2025250     91400   22.1900 -110.8800      12.9         5       121        60
OIR    2025250     91400   22.1900 -110.8900      12.4         3       123        60
OIR    2025250     91400   22.1900 -110.9000      12.0         1       125        60
OIR    2025250     91400   22.1900 -110.9100      11.5       357       128        60
OIR    2025250     91400   22.1900 -110.9200      11.1       352       131        60
OIR    2025250     91400   22.1900 -110.9300      10.6       346       134        60
OIR    2025250     91400   22.1900 -110.9400       9.5       332       137        60
OIR    2025250     91400   22.1800 -110.7600      14.7         0       137        60
OIR    2025250     91400   22.1800 -110.7700      17.1         1       129        60
OIR    2025250     91400   22.1800 -110.7800      17.4         2       122        60
OIR    2025250     91400   22.1800 -110.7900      17.1         3       119        60
OIR    2025250     91400   22.1800 -110.8000      16.7         7       117        60
OIR    2025250     91400   22.1800 -110.8100      15.4        10       116        60
OIR    2025250     91400   22.1800 -110.8200      15.6        10       116        60
OIR    2025250     91400   22.1800 -110.8300      15.2        11       117        60
OIR    2025250     91400   22.1800 -110.8400      14.7        10       117        60
OIR    2025250     91400   22.1800 -110.8500      14.8         9       117        60
OIR    2025250     91400   22.1800 -110.8600      15.0         9       117        60
OIR    2025250     91400   22.1800 -110.8700      15.2         8       120        60
OIR    2025250     91400   22.1800 -110.8800      14.7         7       122        60
OIR    2025250     91400   22.1800 -110.8900      14.3         6       124        60
OIR    2025250     91400   22.1800 -110.9000      13.5         4       126        60
OIR    2025250     91400   22.1800 -110.9100      13.1         1       129        60
OIR    2025250     91400   22.1800 -110.9200      13.4       358       136        60
OIR    2025250     91400   22.1800 -110.9500      11.5       330       139        60
OIR    2025250     91400   22.1800 -110.9600      11.1       315       139        60
OIR    2025250     91400   22.1700 -109.8400       5.6       266       137        60
OIR    2025250     91400   22.1700 -110.7900      17.8       359       132        60
OIR    2025250     91400   22.1700 -110.8000      18.4         3       126        60
OIR    2025250     91400   22.1700 -110.8100      18.0         8       121        60
OIR    2025250     91400   22.1700 -110.8200      17.1        10       120        60
OIR    2025250     91400   22.1700 -110.8300      16.0        10       120        60
OIR    2025250     91400   22.1700 -110.8400      15.6        10       120        60
OIR    2025250     91400   22.1700 -110.8500      15.9        10       120        60
OIR    2025250     91400   22.1700 -110.8600      16.6        10       121        60
OIR    2025250     91400   22.1700 -110.8700      17.1        10       122        60
OIR    2025250     91400   22.1700 -110.8800      16.9        11       124        60
OIR    2025250     91400   22.1700 -110.8900      16.9        11       126        60
OIR    2025250     91400   22.1700 -110.9000      16.1        10       128        60
OIR    2025250     91400   22.1700 -110.9100      13.9         4       130        60
OIR    2025250     91400   22.1700 -110.9200      14.3         1       138        60
OIR    2025250     91400   22.1700 -110.9600      16.0       319       137        60
OIR    2025250     91400   22.1600 -110.8100      18.8       358       128        60
OIR    2025250     91400   22.1600 -110.8200      17.8         5       122        60
OIR    2025250     91400   22.1600 -110.8300      17.4        10       122        60
OIR    2025250     91400   22.1600 -110.8400      16.4        10       122        60
OIR    2025250     91400   22.1600 -110.8500      17.2        12       122        60
OIR    2025250     91400   22.1600 -110.8600      19.5        16       122        60
OIR    2025250     91400   22.1600 -110.8700      22.0        18       123        60
OIR    2025250     91400   22.1600 -110.8800      23.4        19       125        60
OIR    2025250     91400   22.1600 -110.8900      24.8        19       127        60
OIR    2025250     91400   22.1600 -110.9000      24.3        18       129        60
OIR    2025250     91400   22.1600 -110.9100      24.0        17       131        60
OIR    2025250     91400   22.1600 -110.9200      22.9        16       136        60
OIR    2025250     91400   22.1500 -110.8200      17.5       357       133        60
OIR    2025250     91400   22.1500 -110.8300      20.5         7       130        60
OIR    2025250     91400   22.1500 -110.8400      25.3        11       127        60
OIR    2025250     91400   22.1500 -110.8500      27.1        10       127        60
OIR    2025250     91400   22.1500 -110.8600      26.7        14       127        60
OIR    2025250     91400   22.1500 -110.8700      26.5        19       128        60
OIR    2025250     91400   22.1500 -110.8800      25.8        20       130        60
OIR    2025250     91400   22.1500 -110.8900      25.1        20       132        60
OIR    2025250     91400   22.1500 -110.9000      24.2        19       134        60
OIR    2025250     91400   22.1500 -110.9100      23.6        18       135        60
OIR    2025250     91400   22.1500 -110.9200      23.6        16       138        60
OIR    2025250     91400   22.1400 -109.5700       7.6        42       139        60
OIR    2025250     91400   22.1400 -109.5800       7.1        44       137        60
OIR    2025250     91400   22.1400 -109.5900       6.8        47       136        60
OIR    2025250     91400   22.1400 -109.6000       6.6        49       136        60
OIR    2025250     91400   22.1400 -109.6100       6.4        52       137        60
OIR    2025250     91400   22.1400 -109.6200       6.1        54       137        60
OIR    2025250     91400   22.1400 -109.6300       5.7        55       137        60
OIR    2025250     91400   22.1400 -109.6400       5.1        56       137        60
OIR    2025250     91400   22.1400 -109.6500       4.7        55       137        60
OIR    2025250     91400   22.1400 -109.6600       4.3        53       136        60
OIR    2025250     91400   22.1400 -109.8600       7.1       254       138        60
OIR    2025250     91400   22.1400 -109.8700       9.7       254       139        60
OIR    2025250     91400   22.1400 -109.8800      10.4       250       139        60
OIR    2025250     91400   22.1400 -110.8400      25.8        10       138        60
OIR    2025250     91400   22.1400 -110.8500      26.5        10       136        60
OIR    2025250     91400   22.1400 -110.8600      26.0        14       136        60
OIR    2025250     91400   22.1400 -110.8700      27.1        18       136        60
OIR    2025250     91400   22.1300 -109.4900       8.7        35       138        60
OIR    2025250     91400   22.1300 -109.5000       8.8        35       137        60
OIR    2025250     91400   22.1300 -109.5100       8.9        35       136        60
OIR    2025250     91400   22.1300 -109.5200       9.1        35       135        60
OIR    2025250     91400   22.1300 -109.5300       9.3        35       135        60
OIR    2025250     91400   22.1300 -109.5400       9.1        36       136        60
OIR    2025250     91400   22.1300 -109.5500       8.5        38       135        60
OIR    2025250     91400   22.1300 -109.5600       7.8        40       135        60
OIR    2025250     91400   22.1300 -109.5700       7.3        42       134        60
OIR    2025250     91400   22.1300 -109.5800       7.1        43       133        60
OIR    2025250     91400   22.1300 -109.5900       6.9        45       132        60
OIR    2025250     91400   22.1300 -109.6000       6.7        47       132        60
OIR    2025250     91400   22.1300 -109.6100       6.5        49       131        60
OIR    2025250     91400   22.1300 -109.6200       6.1        50       132        60
OIR    2025250     91400   22.1300 -109.6300       5.7        51       132        60
OIR    2025250     91400   22.1300 -109.6400       5.3        51       133        60
OIR    2025250     91400   22.1300 -109.6500       5.0        51       133        60
OIR    2025250     91400   22.1300 -109.6600       4.4        50       133        60
OIR    2025250     91400   22.1300 -109.6700       4.0        48       132        60
OIR    2025250     91400   22.1300 -109.8700       7.9       257       136        60
OIR    2025250     91400   22.1300 -109.8800       9.3       251       135        60
OIR    2025250     91400   22.1300 -109.8900       8.7       247       134        60
OIR    2025250     91400   22.1300 -109.9000       7.1       245       135        60
OIR    2025250     91400   22.1300 -109.9100       5.5       242       137        60
OIR    2025250     91400   22.1300 -109.9700       4.8       346       139        60
OIR    2025250     91400   22.1300 -109.9800       6.0       354       138        60
OIR    2025250     91400   22.1300 -109.9900       6.7         4       138        60
OIR    2025250     91400   22.1300 -110.0000       7.0         9       139        60
OIR    2025250     91400   22.1200 -109.4700       7.9        38       138        60
OIR    2025250     91400   22.1200 -109.4800       8.7        35       135        60
OIR    2025250     91400   22.1200 -109.4900       8.7        35       131        60
OIR    2025250     91400   22.1200 -109.5000       8.8        35       129        60
OIR    2025250     91400   22.1200 -109.5100       8.9        34       128        60
OIR    2025250     91400   22.1200 -109.5200       8.9        34       126        60
OIR    2025250     91400   22.1200 -109.5300       8.9        35       128        60
OIR    2025250     91400   22.1200 -109.5400       8.6        36       129        60
OIR    2025250     91400   22.1200 -109.5500       8.0        39       130        60
OIR    2025250     91400   22.1200 -109.5600       7.5        41       130        60
OIR    2025250     91400   22.1200 -109.5700       7.2        41       130        60
OIR    2025250     91400   22.1200 -109.5800       7.1        42       129        60
OIR    2025250     91400   22.1200 -109.5900       7.0        42       128        60
OIR    2025250     91400   22.1200 -109.6000       6.8        43       127        60
OIR    2025250     91400   22.1200 -109.6100       6.6        44       127        60
OIR    2025250     91400   22.1200 -109.6200       6.3        45       127        60
OIR    2025250     91400   22.1200 -109.6300       5.9        46       128        60
OIR    2025250     91400   22.1200 -109.6400       5.5        47       130        60
OIR    2025250     91400   22.1200 -109.6500       5.1        47       131        60
OIR    2025250     91400   22.1200 -109.6600       4.7        47       131        60
OIR    2025250     91400   22.1200 -109.6700       4.1        46       130        60
OIR    2025250     91400   22.1200 -109.8800       5.8       247       133        60
OIR    2025250     91400   22.1200 -109.8900       6.8       237       132        60
OIR    2025250     91400   22.1200 -109.9000       5.6       230       133        60
OIR    2025250     91400   22.1200 -109.9600       4.1         3       133        60
OIR    2025250     91400   22.1200 -109.9700       5.4         7       132        60
OIR    2025250     91400   22.1200 -109.9800       7.4        11       132        60
OIR    2025250     91400   22.1200 -109.9900       8.2        17       132        60
OIR    2025250     91400   22.1200 -110.0000       8.1        23       133        60
OIR    2025250     91400   22.1200 -110.0100       8.1        26       134        60
OIR    2025250     91400   22.1200 -110.0200       8.1        27       136        60
OIR    2025250     91400   22.1100 -109.4500       5.5        55       138        60
OIR    2025250     91400   22.1100 -109.4600       6.7        44       136        60
OIR    2025250     91400   22.1100 -109.4700       7.3        41       135        60
OIR    2025250     91400   22.1100 -109.4800       8.0        38       133        60
OIR    2025250     91400   22.1100 -109.4900       8.6        35       130        60
OIR    2025250     91400   22.1100 -109.5000       8.7        35       128        60
OIR    2025250     91400   22.1100 -109.5100       8.8        34       127        60
OIR    2025250     91400   22.1100 -109.5200       8.9        34       125        60
OIR    2025250     91400   22.1100 -109.5300       8.8        34       125        60
OIR    2025250     91400   22.1100 -109.5400       8.4        36       126        60
OIR    2025250     91400   22.1100 -109.5500       7.7        39       127        60
OIR    2025250     91400   22.1100 -109.5600       7.4        40       127        60
OIR    2025250     91400   22.1100 -109.5700       7.2        41       127        60
OIR    2025250     91400   22.1100 -109.5800       7.1        41       127        60
OIR    2025250     91400   22.1100 -109.5900       7.0        41       126        60
OIR    2025250     91400   22.1100 -109.6000       6.8        42       125        60
OIR    2025250     91400   22.1100 -109.6100       6.6        42       125        60
OIR    2025250     91400   22.1100 -109.6200       6.4        43       125        60
OIR    2025250     91400   22.1100 -109.6300       6.0        43       126        60
OIR    2025250     91400   22.1100 -109.6400       5.6        44       127        60
OIR    2025250     91400   22.1100 -109.6500       5.2        45       128        60
OIR    2025250     91400   22.1100 -109.6600       4.8        45       128        60
OIR    2025250     91400   22.1100 -109.6700       4.2        45       128        60
OIR    2025250     91400   22.1100 -109.9500       4.5        17       131        60
OIR    2025250     91400   22.1100 -109.9600       5.7        16       130        60
OIR    2025250     91400   22.1100 -109.9700       7.0        17       129        60
OIR    2025250     91400   22.1100 -109.9800       7.5        20       129        60
OIR    2025250     91400   22.1100 -109.9900       8.1        23       129        60
OIR    2025250     91400   22.1100 -110.0000       8.2        26       130        60
OIR    2025250     91400   22.1100 -110.0100       8.2        27       131        60
OIR    2025250     91400   22.1100 -110.0200       8.2        27       132        60
OIR    2025250     91400   22.1100 -110.0300       8.2        27       135        60
OIR    2025250     91400   22.1100 -110.0400       8.2        27       139        60
OIR    2025250     91400   22.1000 -109.3600       7.0        36       138        60
OIR    2025250     91400   22.1000 -109.3700       6.9        37       137        60
OIR    2025250     91400   22.1000 -109.3800       6.7        38       137        60
OIR    2025250     91400   22.1000 -109.3900       6.5        41       137        60
OIR    2025250     91400   22.1000 -109.4000       6.1        44       137        60
OIR    2025250     91400   22.1000 -109.4100       5.7        48       138        60
OIR    2025250     91400   22.1000 -109.4400       5.9        50       137        60
OIR    2025250     91400   22.1000 -109.4500       6.5        45       134        60
OIR    2025250     91400   22.1000 -109.4600       7.0        42       133        60
OIR    2025250     91400   22.1000 -109.4700       7.1        41       132        60
OIR    2025250     91400   22.1000 -109.4800       7.3        40       131        60
OIR    2025250     91400   22.1000 -109.4900       7.7        39       129        60
OIR    2025250     91400   22.1000 -109.5000       8.2        36       126        60
OIR    2025250     91400   22.1000 -109.5100       8.5        35       125        60
OIR    2025250     91400   22.1000 -109.5200       8.6        35       124        60
OIR    2025250     91400   22.1000 -109.5300       8.4        35       123        60
OIR    2025250     91400   22.1000 -109.5400       8.0        36       124        60
OIR    2025250     91400   22.1000 -109.5500       7.5        38       124        60
OIR    2025250     91400   22.1000 -109.5600       7.3        40       124        60
OIR    2025250     91400   22.1000 -109.5700       7.1        40       125        60
OIR    2025250     91400   22.1000 -109.5800       7.0        41       125        60
OIR    2025250     91400   22.1000 -109.5900       6.9        41       124        60
OIR    2025250     91400   22.1000 -109.6000       6.8        41       124        60
OIR    2025250     91400   22.1000 -109.6100       6.6        42       124        60
OIR    2025250     91400   22.1000 -109.6200       6.3        42       123        60
OIR    2025250     91400   22.1000 -109.6300       6.0        42       124        60
OIR    2025250     91400   22.1000 -109.6400       5.6        43       124        60
OIR    2025250     91400   22.1000 -109.6500       5.2        43       124        60
OIR    2025250     91400   22.1000 -109.6600       4.8        43       124        60
OIR    2025250     91400   22.1000 -109.6700       4.3        44       125        60
OIR    2025250     91400   22.1000 -109.9400       4.0        27       131        60
OIR    2025250     91400   22.1000 -109.9500       4.8        23       130        60
OIR    2025250     91400   22.1000 -109.9600       5.9        22       129        60
OIR    2025250     91400   22.1000 -109.9700       7.0        22       128        60
OIR    2025250     91400   22.1000 -109.9800       7.6        23       127        60
OIR    2025250     91400   22.1000 -109.9900       8.0        25       127        60
OIR    2025250     91400   22.1000 -110.0000       8.2        27       128        60
OIR    2025250     91400   22.1000 -110.0100       8.2        27       128        60
OIR    2025250     91400   22.1000 -110.0200       8.2        27       129        60
OIR    2025250     91400   22.1000 -110.0300       8.2        27       132        60
OIR    2025250     91400   22.1000 -110.0400       8.1        27       134        60
OIR    2025250     91400   22.1000 -110.0500       8.1        27       137        60
OIR    2025250     91400   22.1000 -110.0600       8.1        27       140        60
OIR    2025250     91400   22.0900 -109.2400       7.0        36       138        60
OIR    2025250     91400   22.0900 -109.2500       7.0        36       137        60
OIR    2025250     91400   22.0900 -109.2600       7.0        36       137        60
OIR    2025250     91400   22.0900 -109.2700       7.0        36       136        60
OIR    2025250     91400   22.0900 -109.2800       7.0        36       136        60
OIR    2025250     91400   22.0900 -109.2900       7.0        36       136        60
OIR    2025250     91400   22.0900 -109.3000       7.0        36       135        60
OIR    2025250     91400   22.0900 -109.3100       7.1        36       135        60
OIR    2025250     91400   22.0900 -109.3200       7.1        36       135        60
OIR    2025250     91400   22.0900 -109.3300       7.1        36       134        60
OIR    2025250     91400   22.0900 -109.3400       7.1        36       135        60
OIR    2025250     91400   22.0900 -109.3500       7.1        36       136        60
OIR    2025250     91400   22.0900 -109.3600       7.1        37       135        60
OIR    2025250     91400   22.0900 -109.3700       7.0        38       134        60
OIR    2025250     91400   22.0900 -109.3800       6.9        39       134        60
OIR    2025250     91400   22.0900 -109.3900       6.8        40       134        60
OIR    2025250     91400   22.0900 -109.4000       6.6        41       135        60
OIR    2025250     91400   22.0900 -109.4100       6.5        42       135        60
OIR    2025250     91400   22.0900 -109.4200       6.6        43       135        60
OIR    2025250     91400   22.0900 -109.4300       6.7        42       135        60
OIR    2025250     91400   22.0900 -109.4400       6.8        42       134        60
OIR    2025250     91400   22.0900 -109.4500       6.9        41       133        60
OIR    2025250     91400   22.0900 -109.4600       7.0        41       132        60
OIR    2025250     91400   22.0900 -109.4700       7.0        41       131        60
OIR    2025250     91400   22.0900 -109.4800       7.1        41       130        60
OIR    2025250     91400   22.0900 -109.4900       7.2        40       127        60
OIR    2025250     91400   22.0900 -109.5000       7.4        39       123        60
OIR    2025250     91400   22.0900 -109.5100       7.6        38       122        60
OIR    2025250     91400   22.0900 -109.5200       7.7        37       122        60
OIR    2025250     91400   22.0900 -109.5300       7.6        37       121        60
OIR    2025250     91400   22.0900 -109.5400       7.4        38       122        60
OIR    2025250     91400   22.0900 -109.5500       7.2        39       122        60
OIR    2025250     91400   22.0900 -109.5600       7.1        40       122        60
OIR    2025250     91400   22.0900 -109.5700       7.0        40       122        60
OIR    2025250     91400   22.0900 -109.5800       7.0        40       122        60
OIR    2025250     91400   22.0900 -109.5900       6.9        41       122        60
OIR    2025250     91400   22.0900 -109.6000       6.7        41       122        60
OIR    2025250     91400   22.0900 -109.6100       6.4        42       122        60
OIR    2025250     91400   22.0900 -109.6200       6.2        42       122        60
OIR    2025250     91400   22.0900 -109.6300       5.8        42       122        60
OIR    2025250     91400   22.0900 -109.6400       5.5        42       122        60
OIR    2025250     91400   22.0900 -109.6500       5.2        43       123        60
OIR    2025250     91400   22.0900 -109.6600       4.8        43       122        60
OIR    2025250     91400   22.0900 -109.6700       4.3        44       121        60
OIR    2025250     91400   22.0900 -109.9400       4.0        34       129        60
OIR    2025250     91400   22.0900 -109.9500       4.4        31       130        60
OIR    2025250     91400   22.0900 -109.9600       5.3        28       129        60
OIR    2025250     91400   22.0900 -109.9700       6.4        26       129        60
OIR    2025250     91400   22.0900 -109.9800       7.3        26       129        60
OIR    2025250     91400   22.0900 -109.9900       7.9        27       128        60
OIR    2025250     91400   22.0900 -110.0000       8.1        27       127        60
OIR    2025250     91400   22.0900 -110.0100       8.1        27       128        60
OIR    2025250     91400   22.0900 -110.0200       8.1        27       129        60
OIR    2025250     91400   22.0900 -110.0300       8.1        27       130        60
OIR    2025250     91400   22.0900 -110.0400       8.1        27       132        60
OIR    2025250     91400   22.0900 -110.0500       8.1        27       134        60
OIR    2025250     91400   22.0900 -110.0600       7.9        28       135        60
OIR    2025250     91400   22.0900 -110.0700       7.8        28       137        60
OIR    2025250     91400   22.0900 -110.0800       7.6        29       138        60
OIR    2025250     91400   22.0900 -110.0900       7.5        31       139        60
OIR    2025250     91400   22.0800 -109.2000       7.1        34       138        60
OIR    2025250     91400   22.0800 -109.2100       7.1        35       137        60
OIR    2025250     91400   22.0800 -109.2200       7.1        36       136        60
OIR    2025250     91400   22.0800 -109.2300       7.1        36       136        60
OIR    2025250     91400   22.0800 -109.2400       7.0        36       135        60
OIR    2025250     91400   22.0800 -109.2500       7.0        36       135        60
OIR    2025250     91400   22.0800 -109.2600       7.0        36       135        60
OIR    2025250     91400   22.0800 -109.2700       7.1        37       135        60
OIR    2025250     91400   22.0800 -109.2800       7.1        37       135        60
OIR    2025250     91400   22.0800 -109.2900       7.1        37       135        60
OIR    2025250     91400   22.0800 -109.3000       7.1        37       134        60
OIR    2025250     91400   22.0800 -109.3100       7.1        37       134        60
OIR    2025250     91400   22.0800 -109.3200       7.1        37       133        60
OIR    2025250     91400   22.0800 -109.3300       7.1        37       132        60
OIR    2025250     91400   22.0800 -109.3400       7.1        37       133        60
OIR    2025250     91400   22.0800 -109.3500       7.1        37       133        60
OIR    2025250     91400   22.0800 -109.3600       7.1        38       134        60
OIR    2025250     91400   22.0800 -109.3700       7.0        38       133        60
OIR    2025250     91400   22.0800 -109.3800       7.0        39       132        60
OIR    2025250     91400   22.0800 -109.3900       6.9        39       132        60
OIR    2025250     91400   22.0800 -109.4000       6.9        40       133        60
OIR    2025250     91400   22.0800 -109.4100       6.9        40       133        60
OIR    2025250     91400   22.0800 -109.4200       7.0        40       133        60
OIR    2025250     91400   22.0800 -109.4300       7.0        40       133        60
OIR    2025250     91400   22.0800 -109.4400       7.0        40       132        60
OIR    2025250     91400   22.0800 -109.4500       7.0        41       131        60
OIR    2025250     91400   22.0800 -109.4600       7.0        41       131        60
OIR    2025250     91400   22.0800 -109.4700       7.0        41       130        60
OIR    2025250     91400   22.0800 -109.4800       7.0        40       129        60
OIR    2025250     91400   22.0800 -109.4900       7.1        40       126        60
OIR    2025250     91400   22.0800 -109.5000       7.1        40       121        60
OIR    2025250     91400   22.0800 -109.5100       7.1        40       119        60
OIR    2025250     91400   22.0800 -109.5200       7.1        39       119        60
OIR    2025250     91400   22.0800 -109.5300       7.1        39       117        60
OIR    2025250     91400   22.0800 -109.5400       7.1        40       119        60
OIR    2025250     91400   22.0800 -109.5500       7.0        40       120        60
OIR    2025250     91400   22.0800 -109.5600       7.0        40       121        60
OIR    2025250     91400   22.0800 -109.5700       7.0        40       120        60
OIR    2025250     91400   22.0800 -109.5800       6.9        40       117        60
OIR    2025250     91400   22.0800 -109.5900       6.8        41       119        60
OIR    2025250     91400   22.0800 -109.6000       6.6        41       119        60
OIR    2025250     91400   22.0800 -109.6100       6.3        42       119        60
OIR    2025250     91400   22.0800 -109.6200       6.0        42       119        60
OIR    2025250     91400   22.0800 -109.6300       5.7        42       120        60
OIR    2025250     91400   22.0800 -109.6400       5.3        42       121        60
OIR    2025250     91400   22.0800 -109.6500       5.0        43       122        60
OIR    2025250     91400   22.0800 -109.6600       4.7        43       122        60
OIR    2025250     91400   22.0800 -109.6700       4.2        45       119        60
OIR    2025250     91400   22.0800 -109.9400       4.0        39       128        60
OIR    2025250     91400   22.0800 -109.9500       4.3        37       129        60
OIR    2025250     91400   22.0800 -109.9600       4.7        34       129        60
OIR    2025250     91400   22.0800 -109.9700       5.5        31       130        60
OIR    2025250     91400   22.0800 -109.9800       6.6        29       130        60
OIR    2025250     91400   22.0800 -109.9900       7.5        29       129        60
OIR    2025250     91400   22.0800 -110.0000       7.9        28       128        60
OIR    2025250     91400   22.0800 -110.0100       8.1        28       128        60
OIR    2025250     91400   22.0800 -110.0200       8.1        28       128        60
OIR    2025250     91400   22.0800 -110.0300       8.1        28       129        60
OIR    2025250     91400   22.0800 -110.0400       8.1        28       130        60
OIR    2025250     91400   22.0800 -110.0500       8.0        28       131        60
OIR    2025250     91400   22.0800 -110.0600       7.8        29       131        60
OIR    2025250     91400   22.0800 -110.0700       7.6        29       132        60
OIR    2025250     91400   22.0800 -110.0800       7.4        31       133        60
OIR    2025250     91400   22.0800 -110.0900       7.2        32       134        60
OIR    2025250     91400   22.0800 -110.1000       6.9        35       136        60
OIR    2025250     91400   22.0800 -110.1100       6.6        40       138        60
OIR    2025250     91400   22.0800 -110.1200       6.4        44       139        60
OIR    2025250     91400   22.0700 -109.1100       7.9        12       138        60
OIR    2025250     91400   22.0700 -109.1600       8.2        15       138        60
OIR    2025250     91400   22.0700 -109.1700       8.0        19       138        60
OIR    2025250     91400   22.0700 -109.1800       7.5        26       137        60
OIR    2025250     91400   22.0700 -109.1900       7.3        33       135        60
OIR    2025250     91400   22.0700 -109.2000       7.2        35       134        60
OIR    2025250     91400   22.0700 -109.2100       7.1        36       132        60
OIR    2025250     91400   22.0700 -109.2200       7.1        37       132        60
OIR    2025250     91400   22.0700 -109.2300       7.1        37       132        60
OIR    2025250     91400   22.0700 -109.2400       7.1        37       132        60
OIR    2025250     91400   22.0700 -109.2500       7.1        37       132        60
OIR    2025250     91400   22.0700 -109.2600       7.1        37       133        60
OIR    2025250     91400   22.0700 -109.2700       7.1        37       133        60
OIR    2025250     91400   22.0700 -109.2800       7.1        37       133        60
OIR    2025250     91400   22.0700 -109.2900       7.1        37       134        60
OIR    2025250     91400   22.0700 -109.3000       7.1        37       133        60
OIR    2025250     91400   22.0700 -109.3100       7.1        37       133        60
OIR    2025250     91400   22.0700 -109.3200       7.1        37       133        60
OIR    2025250     91400   22.0700 -109.3300       7.1        37       132        60
OIR    2025250     91400   22.0700 -109.3400       7.1        38       132        60
OIR    2025250     91400   22.0700 -109.3500       7.1        38       132        60
OIR    2025250     91400   22.0700 -109.3600       7.1        38       132        60
OIR    2025250     91400   22.0700 -109.3700       7.1        39       132        60
OIR    2025250     91400   22.0700 -109.3800       7.0        39       132        60
OIR    2025250     91400   22.0700 -109.3900       7.0        39       132        60
OIR    2025250     91400   22.0700 -109.4000       7.0        40       132        60
OIR    2025250     91400   22.0700 -109.4100       7.0        40       132        60
OIR    2025250     91400   22.0700 -109.4200       7.0        40       132        60
OIR    2025250     91400   22.0700 -109.4300       7.0        40       132        60
OIR    2025250     91400   22.0700 -109.4400       7.0        40       131        60
OIR    2025250     91400   22.0700 -109.4500       7.0        40       131        60
OIR    2025250     91400   22.0700 -109.4600       7.0        40       131        60
OIR    2025250     91400   22.0700 -109.4700       7.0        40       128        60
OIR    2025250     91400   22.0700 -109.4800       7.0        40       125        60
OIR    2025250     91400   22.0700 -109.4900       7.0        40       123        60
OIR    2025250     91400   22.0700 -109.5000       7.0        40       120        60
OIR    2025250     91400   22.0700 -109.5100       7.0        40       117        60
OIR    2025250     91400   22.0700 -109.5200       7.0        40       119        60
OIR    2025250     91400   22.0700 -109.5300       7.0        40       119        60
OIR    2025250     91400   22.0700 -109.5400       7.0        40       120        60
OIR    2025250     91400   22.0700 -109.5500       7.0        40       120        60
OIR    2025250     91400   22.0700 -109.5600       7.0        40       120        60
OIR    2025250     91400   22.0700 -109.5700       6.9        40       119        60
OIR    2025250     91400   22.0700 -109.5800       6.9        40       117        60
OIR    2025250     91400   22.0700 -109.5900       6.8        41       117        60
OIR    2025250     91400   22.0700 -109.6000       6.5        41       119        60
OIR    2025250     91400   22.0700 -109.6100       6.1        42       120        60
OIR    2025250     91400   22.0700 -109.6200       5.8        42       119        60
OIR    2025250     91400   22.0700 -109.6300       5.5        43       119        60
OIR    2025250     91400   22.0700 -109.6400       5.1        43       120        60
OIR    2025250     91400   22.0700 -109.6500       4.8        43       121        60
OIR    2025250     91400   22.0700 -109.6600       4.5        44       122        60
OIR    2025250     91400   22.0700 -109.6700       4.2        45       117        60
OIR    2025250     91400   22.0700 -109.9500       4.1        40       129        60
OIR    2025250     91400   22.0700 -109.9600       4.5        38       129        60
OIR    2025250     91400   22.0700 -109.9700       4.9        36       129        60
OIR    2025250     91400   22.0700 -109.9800       5.6        34       129        60
OIR    2025250     91400   22.0700 -109.9900       6.7        32       129        60
OIR    2025250     91400   22.0700 -110.0000       7.4        30       129        60
OIR    2025250     91400   22.0700 -110.0100       7.8        29       129        60
OIR    2025250     91400   22.0700 -110.0200       8.0        28       129        60
OIR    2025250     91400   22.0700 -110.0300       8.0        28       129        60
OIR    2025250     91400   22.0700 -110.0400       7.9        28       130        60
OIR    2025250     91400   22.0700 -110.0500       7.8        29       130        60
OIR    2025250     91400   22.0700 -110.0600       7.6        30       131        60
OIR    2025250     91400   22.0700 -110.0700       7.4        31       131        60
OIR    2025250     91400   22.0700 -110.0800       7.2        32       131        60
OIR    2025250     91400   22.0700 -110.0900       6.9        34       132        60
OIR    2025250     91400   22.0700 -110.1000       6.6        37       132        60
OIR    2025250     91400   22.0700 -110.1100       6.3        42       134        60
OIR    2025250     91400   22.0700 -110.1200       6.2        45       135        60
OIR    2025250     91400   22.0700 -110.1300       6.1        46       137        60
OIR    2025250     91400   22.0700 -110.1400       6.2        46       139        60
OIR    2025250     91400   22.0600 -109.1100       7.4        21       137        60
OIR    2025250     91400   22.0600 -109.1200       7.6        19       137        60
OIR    2025250     91400   22.0600 -109.1300       8.0        16       138        60
OIR    2025250     91400   22.0600 -109.1500       8.2        16       138        60
OIR    2025250     91400   22.0600 -109.1600       8.1        19       136        60
OIR    2025250     91400   22.0600 -109.1700       7.8        23       135        60
OIR    2025250     91400   22.0600 -109.1800       7.3        30       135        60
OIR    2025250     91400   22.0600 -109.1900       7.2        35       134        60
OIR    2025250     91400   22.0600 -109.2000       7.2        36       133        60
OIR    2025250     91400   22.0600 -109.2100       7.2        37       133        60
OIR    2025250     91400   22.0600 -109.2200       7.1        37       133        60
OIR    2025250     91400   22.0600 -109.2300       7.1        37       132        60
OIR    2025250     91400   22.0600 -109.2400       7.1        37       132        60
OIR    2025250     91400   22.0600 -109.2500       7.1        37       132        60
OIR    2025250     91400   22.0600 -109.2600       7.1        37       131        60
OIR    2025250     91400   22.0600 -109.2700       7.1        37       131        60
OIR    2025250     91400   22.0600 -109.2800       7.1        37       131        60
OIR    2025250     91400   22.0600 -109.2900       7.1        37       131        60
OIR    2025250     91400   22.0600 -109.3000       7.1        37       132        60
OIR    2025250     91400   22.0600 -109.3100       7.1        38       132        60
OIR    2025250     91400   22.0600 -109.3200       7.1        38       132        60
OIR    2025250     91400   22.0600 -109.3300       7.1        38       132        60
OIR    2025250     91400   22.0600 -109.3400       7.1        38       132        60
OIR    2025250     91400   22.0600 -109.3500       7.1        38       131        60
OIR    2025250     91400   22.0600 -109.3600       7.1        39       131        60
OIR    2025250     91400   22.0600 -109.3700       7.1        39       131        60
OIR    2025250     91400   22.0600 -109.3800       7.1        39       131        60
OIR    2025250     91400   22.0600 -109.3900       7.1        39       131        60
OIR    2025250     91400   22.0600 -109.4000       7.0        40       132        60
OIR    2025250     91400   22.0600 -109.4100       7.0        40       132        60
OIR    2025250     91400   22.0600 -109.4200       7.0        40       131        60
OIR    2025250     91400   22.0600 -109.4300       7.0        40       130        60
OIR    2025250     91400   22.0600 -109.4400       7.0        40       130        60
OIR    2025250     91400   22.0600 -109.4500       7.0        40       131        60
OIR    2025250     91400   22.0600 -109.4600       7.0        40       131        60
OIR    2025250     91400   22.0600 -109.4700       7.0        40       127        60
OIR    2025250     91400   22.0600 -109.4800       7.0        40       123        60
OIR    2025250     91400   22.0600 -109.4900       7.0        40       119        60
OIR    2025250     91400   22.0600 -109.5000       7.0        40       117        60
OIR    2025250     91400   22.0600 -109.5100       7.0        40       116        60
OIR    2025250     91400   22.0600 -109.5200       7.0        40       116        60
OIR    2025250     91400   22.0600 -109.5300       7.0        40       120        60
OIR    2025250     91400   22.0600 -109.5400       7.0        40       121        60
OIR    2025250     91400   22.0600 -109.5500       7.0        40       120        60
OIR    2025250     91400   22.0600 -109.5600       6.9        40       119        60
OIR    2025250     91400   22.0600 -109.5700       6.9        40       117        60
OIR    2025250     91400   22.0600 -109.5800       6.8        40       116        60
OIR    2025250     91400   22.0600 -109.5900       6.7        41       117        60
OIR    2025250     91400   22.0600 -109.6000       6.4        42       119        60
OIR    2025250     91400   22.0600 -109.6100       6.0        42       121        60
OIR    2025250     91400   22.0600 -109.6200       5.6        43       121        60
OIR    2025250     91400   22.0600 -109.6300       5.2        43       119        60
OIR    2025250     91400   22.0600 -109.6400       4.9        44       119        60
OIR    2025250     91400   22.0600 -109.6500       4.6        44       119        60
OIR    2025250     91400   22.0600 -109.6600       4.3        45       119        60
OIR    2025250     91400   22.0600 -109.6700       4.1        45       117        60
OIR    2025250     91400   22.0600 -109.9500       4.0        43       128        60
OIR    2025250     91400   22.0600 -109.9600       4.2        42       129        60
OIR    2025250     91400   22.0600 -109.9700       4.5        40       130        60
OIR    2025250     91400   22.0600 -109.9800       4.8        39       129        60
OIR    2025250     91400   22.0600 -109.9900       5.5        36       129        60
OIR    2025250     91400   22.0600 -110.0000       6.3        33       129        60
OIR    2025250     91400   22.0600 -110.0100       6.9        32       129        60
OIR    2025250     91400   22.0600 -110.0200       7.4        30       130        60
OIR    2025250     91400   22.0600 -110.0300       7.6        29       130        60
OIR    2025250     91400   22.0600 -110.0400       7.6        30       130        60
OIR    2025250     91400   22.0600 -110.0500       7.4        30       130        60
OIR    2025250     91400   22.0600 -110.0600       7.3        31       130        60
OIR    2025250     91400   22.0600 -110.0700       7.1        32       130        60
OIR    2025250     91400   22.0600 -110.0800       7.0        33       130        60
OIR    2025250     91400   22.0600 -110.0900       6.7        35       130        60
OIR    2025250     91400   22.0600 -110.1000       6.3        39       129        60
OIR    2025250     91400   22.0600 -110.1100       6.0        43       129        60
OIR    2025250     91400   22.0600 -110.1200       5.9        46       131        60
OIR    2025250     91400   22.0600 -110.1300       5.9        46       133        60
OIR    2025250     91400   22.0600 -110.1400       6.0        46       134        60
OIR    2025250     91400   22.0600 -110.1500       6.0        46       136        60
OIR    2025250     91400   22.0600 -110.1600       5.9        47       138        60
OIR    2025250     91400   22.0500 -109.1000       7.1        28       138        60
OIR    2025250     91400   22.0500 -109.1100       7.3        28       136        60
OIR    2025250     91400   22.0500 -109.1200       7.3        28       135        60
OIR    2025250     91400   22.0500 -109.1300       7.6        25       134        60
OIR    2025250     91400   22.0500 -109.1400       7.8        23       134        60
OIR    2025250     91400   22.0500 -109.1500       7.9        23       134        60
OIR    2025250     91400   22.0500 -109.1600       7.8        25       133        60
OIR    2025250     91400   22.0500 -109.1700       7.5        29       133        60
OIR    2025250     91400   22.0500 -109.1800       7.3        33       132        60
OIR    2025250     91400   22.0500 -109.1900       7.2        36       132        60
OIR    2025250     91400   22.0500 -109.2000       7.2        37       132        60
OIR    2025250     91400   22.0500 -109.2100       7.2        37       133        60
OIR    2025250     91400   22.0500 -109.2200       7.2        37       133        60
OIR    2025250     91400   22.0500 -109.2300       7.1        37       133        60
OIR    2025250     91400   22.0500 -109.2400       7.1        37       132        60
OIR    2025250     91400   22.0500 -109.2500       7.1        37       131        60
OIR    2025250     91400   22.0500 -109.2600       7.1        37       130        60
OIR    2025250     91400   22.0500 -109.2700       7.1        37       130        60
OIR    2025250     91400   22.0500 -109.2800       7.1        37       129        60
OIR    2025250     91400   22.0500 -109.2900       7.1        38       129        60
OIR    2025250     91400   22.0500 -109.3000       7.1        38       130        60
OIR    2025250     91400   22.0500 -109.3100       7.1        38       131        60
OIR    2025250     91400   22.0500 -109.3200       7.1        38       132        60
OIR    2025250     91400   22.0500 -109.3300       7.1        38       131        60
OIR    2025250     91400   22.0500 -109.3400       7.1        39       131        60
OIR    2025250     91400   22.0500 -109.3500       7.1        39       131        60
OIR    2025250     91400   22.0500 -109.3600       7.1        39       131        60
OIR    2025250     91400   22.0500 -109.3700       7.1        39       130        60
OIR    2025250     91400   22.0500 -109.3800       7.1        39       130        60
OIR    2025250     91400   22.0500 -109.3900       7.1        39       130        60
OIR    2025250     91400   22.0500 -109.4000       7.1        40       131        60
OIR    2025250     91400   22.0500 -109.4100       7.1        40       131        60
OIR    2025250     91400   22.0500 -109.4200       7.0        40       131        60
OIR    2025250     91400   22.0500 -109.4300       7.0        40       129        60
OIR    2025250     91400   22.0500 -109.4400       7.0        40       127        60
OIR    2025250     91400   22.0500 -109.4500       7.0        40       127        60
OIR    2025250     91400   22.0500 -109.4600       7.0        40       127        60
OIR    2025250     91400   22.0500 -109.4700       7.0        40       125        60
OIR    2025250     91400   22.0500 -109.4800       7.0        40       122        60
OIR    2025250     91400   22.0500 -109.4900       7.0        40       120        60
OIR    2025250     91400   22.0500 -109.5000       7.0        40       119        60
OIR    2025250     91400   22.0500 -109.5100       7.0        40       117        60
OIR    2025250     91400   22.0500 -109.5200       7.0        40       116        60
OIR    2025250     91400   22.0500 -109.5300       7.0        40       117        60
OIR    2025250     91400   22.0500 -109.5400       7.0        40       119        60
OIR    2025250     91400   22.0500 -109.5500       6.9        40       119        60
OIR    2025250     91400   22.0500 -109.5600       6.9        40       119        60
OIR    2025250     91400   22.0500 -109.5700       6.9        40       117        60
OIR    2025250     91400   22.0500 -109.5800       6.8        40       116        60
OIR    2025250     91400   22.0500 -109.5900       6.6        41       116        60
OIR    2025250     91400   22.0500 -109.6000       6.2        42       119        60
OIR    2025250     91400   22.0500 -109.6100       5.8        43       121        60
OIR    2025250     91400   22.0500 -109.6200       5.3        43       122        60
OIR    2025250     91400   22.0500 -109.6300       5.0        44       121        60
OIR    2025250     91400   22.0500 -109.6400       4.7        44       120        60
OIR    2025250     91400   22.0500 -109.6500       4.5        45       119        60
OIR    2025250     91400   22.0500 -109.6600       4.3        45       119        60
OIR    2025250     91400   22.0500 -109.6700       4.0        46       117        60
OIR    2025250     91400   22.0500 -109.9600       4.1        44       129        60
OIR    2025250     91400   22.0500 -109.9700       4.3        43       130        60
OIR    2025250     91400   22.0500 -109.9800       4.5        42       131        60
OIR    2025250     91400   22.0500 -109.9900       4.7        42       132        60
OIR    2025250     91400   22.0500 -110.0000       5.0        41       131        60
OIR    2025250     91400   22.0500 -110.0100       5.3        39       131        60
OIR    2025250     91400   22.0500 -110.0200       5.7        37       131        60
OIR    2025250     91400   22.0500 -110.0300       6.1        35       131        60
OIR    2025250     91400   22.0500 -110.0400       6.5        34       131        60
OIR    2025250     91400   22.0500 -110.0500       6.6        34       130        60
OIR    2025250     91400   22.0500 -110.0600       6.7        34       130        60
OIR    2025250     91400   22.0500 -110.0700       6.6        34       130        60
OIR    2025250     91400   22.0500 -110.0800       6.5        36       131        60
OIR    2025250     91400   22.0500 -110.0900       6.1        38       130        60
OIR    2025250     91400   22.0500 -110.1000       5.8        42       130        60
OIR    2025250     91400   22.0500 -110.1100       5.5        46       130        60
OIR    2025250     91400   22.0500 -110.1200       5.3        49       130        60
OIR    2025250     91400   22.0500 -110.1300       5.1        50       130        60
OIR    2025250     91400   22.0500 -110.1400       5.0        52       132        60
OIR    2025250     91400   22.0500 -110.1500       4.8        53       133        60
OIR    2025250     91400   22.0500 -110.1600       4.9        53       134        60
OIR    2025250     91400   22.0500 -110.1700       4.9        53       138        60
OIR    2025250     91400   22.0400 -109.0800       6.9        34       138        60
OIR    2025250     91400   22.0400 -109.0900       7.0        34       136        60
OIR    2025250     91400   22.0400 -109.1000       7.1        34       134        60
OIR    2025250     91400   22.0400 -109.1100       7.2        34       133        60
OIR    2025250     91400   22.0400 -109.1200       7.3        34       132        60
OIR    2025250     91400   22.0400 -109.1300       7.4        33       131        60
OIR    2025250     91400   22.0400 -109.1400       7.5        31       130        60
OIR    2025250     91400   22.0400 -109.1500       7.6        30       129        60
OIR    2025250     91400   22.0400 -109.1600       7.5        32       129        60
OIR    2025250     91400   22.0400 -109.1700       7.3        34       129        60
OIR    2025250     91400   22.0400 -109.1800       7.2        36       129        60
OIR    2025250     91400   22.0400 -109.1900       7.2        37       129        60
OIR    2025250     91400   22.0400 -109.2000       7.2        37       130        60
OIR    2025250     91400   22.0400 -109.2100       7.2        37       131        60
OIR    2025250     91400   22.0400 -109.2200       7.2        37       131        60
OIR    2025250     91400   22.0400 -109.2300       7.2        37       131        60
OIR    2025250     91400   22.0400 -109.2400       7.1        37       131        60
OIR    2025250     91400   22.0400 -109.2500       7.1        37       130        60
OIR    2025250     91400   22.0400 -109.2600       7.1        37       130        60
OIR    2025250     91400   22.0400 -109.2700       7.1        38       129        60
OIR    2025250     91400   22.0400 -109.2800       7.1        38       128        60
OIR    2025250     91400   22.0400 -109.2900       7.1        38       127        60
OIR    2025250     91400   22.0400 -109.3000       7.1        38       128        60
OIR    2025250     91400   22.0400 -109.3100       7.1        38       129        60
OIR    2025250     91400   22.0400 -109.3200       7.1        38       130        60
OIR    2025250     91400   22.0400 -109.3300       7.1        39       130        60
OIR    2025250     91400   22.0400 -109.3400       7.1        39       130        60
OIR    2025250     91400   22.0400 -109.3500       7.1        39       130        60
OIR    2025250     91400   22.0400 -109.3600       7.1        39       129        60
OIR    2025250     91400   22.0400 -109.3700       7.1        39       129        60
OIR    2025250     91400   22.0400 -109.3800       7.1        39       129        60
OIR    2025250     91400   22.0400 -109.3900       7.1        39       129        60
OIR    2025250     91400   22.0400 -109.4000       7.1        40       130        60
OIR    2025250     91400   22.0400 -109.4100       7.1        40       131        60
OIR    2025250     91400   22.0400 -109.4200       7.1        40       130        60
OIR    2025250     91400   22.0400 -109.4300       7.0        40       128        60
OIR    2025250     91400   22.0400 -109.4400       7.0        40       126        60
OIR    2025250     91400   22.0400 -109.4500       7.0        40       124        60
OIR    2025250     91400   22.0400 -109.4600       7.0        40       123        60
OIR    2025250     91400   22.0400 -109.4700       7.0        40       122        60
OIR    2025250     91400   22.0400 -109.4800       7.0        40       122        60
OIR    2025250     91400   22.0400 -109.4900       7.0        40       121        60
OIR    2025250     91400   22.0400 -109.5000       7.0        40       120        60
OIR    2025250     91400   22.0400 -109.5100       7.0        40       119        60
OIR    2025250     91400   22.0400 -109.5200       7.0        40       117        60
OIR    2025250     91400   22.0400 -109.5300       7.0        40       117        60
OIR    2025250     91400   22.0400 -109.5400       7.0        40       116        60
OIR    2025250     91400   22.0400 -109.5500       6.9        40       117        60
OIR    2025250     91400   22.0400 -109.5600       6.9        40       117        60
OIR    2025250     91400   22.0400 -109.5700       6.8        40       119        60
OIR    2025250     91400   22.0400 -109.5800       6.7        40       116        60
OIR    2025250     91400   22.0400 -109.5900       6.5        41       115        60
OIR    2025250     91400   22.0400 -109.6000       6.0        41       117        60
OIR    2025250     91400   22.0400 -109.6100       5.5        42       120        60
OIR    2025250     91400   22.0400 -109.6200       5.1        43       122        60
OIR    2025250     91400   22.0400 -109.6300       4.8        44       123        60
OIR    2025250     91400   22.0400 -109.6400       4.6        44       124        60
OIR    2025250     91400   22.0400 -109.6500       4.4        45       123        60
OIR    2025250     91400   22.0400 -109.6600       4.2        45       122        60
OIR    2025250     91400   22.0400 -109.6700       4.0        46       121        60
OIR    2025250     91400   22.0400 -109.9600       4.0        46       130        60
OIR    2025250     91400   22.0400 -109.9700       4.1        46       131        60
OIR    2025250     91400   22.0400 -109.9800       4.2        45       132        60
OIR    2025250     91400   22.0400 -109.9900       4.4        44       134        60
OIR    2025250     91400   22.0400 -110.0000       4.6        44       133        60
OIR    2025250     91400   22.0400 -110.0100       4.8        43       133        60
OIR    2025250     91400   22.0400 -110.0200       5.0        43       133        60
OIR    2025250     91400   22.0400 -110.0300       5.0        43       133        60
OIR    2025250     91400   22.0400 -110.0400       5.1        43       133        60
OIR    2025250     91400   22.0400 -110.0500       5.2        43       132        60
OIR    2025250     91400   22.0400 -110.0600       5.3        43       130        60
OIR    2025250     91400   22.0400 -110.0700       5.4        43       130        60
OIR    2025250     91400   22.0400 -110.0800       5.3        43       131        60
OIR    2025250     91400   22.0400 -110.0900       5.2        45       132        60
OIR    2025250     91400   22.0400 -110.1000       5.1        47       131        60
OIR    2025250     91400   22.0400 -110.1100       4.9        50       131        60
OIR    2025250     91400   22.0400 -110.1200       4.7        53       131        60
OIR    2025250     91400   22.0400 -110.1300       4.5        55       130        60
OIR    2025250     91400   22.0400 -110.1400       4.4        56       131        60
OIR    2025250     91400   22.0400 -110.1500       4.4        56       133        60
OIR    2025250     91400   22.0400 -110.1600       4.5        56       134        60
OIR    2025250     91400   22.0400 -110.1700       4.6        55       136        60
OIR    2025250     91400   22.0400 -110.1800       4.6        55       139        60
OIR    2025250     91400   22.0300 -109.0300       7.0        39       137        60
OIR    2025250     91400   22.0300 -109.0400       6.9        38       135        60
OIR    2025250     91400   22.0300 -109.0500       7.0        38       134        60
OIR    2025250     91400   22.0300 -109.0600       7.0        38       135        60
OIR    2025250     91400   22.0300 -109.0700       7.0        38       136        60
OIR    2025250     91400   22.0300 -109.0800       7.1        38       134        60
OIR    2025250     91400   22.0300 -109.0900       7.1        38       132        60
OIR    2025250     91400   22.0300 -109.1000       7.2        38       131        60
OIR    2025250     91400   22.0300 -109.1100       7.2        38       130        60
OIR    2025250     91400   22.0300 -109.1200       7.3        38       129        60
OIR    2025250     91400   22.0300 -109.1300       7.3        38       128        60
OIR    2025250     91400   22.0300 -109.1400       7.3        37       126        60
OIR    2025250     91400   22.0300 -109.1500       7.4        36       125        60
OIR    2025250     91400   22.0300 -109.1600       7.3        37       125        60
OIR    2025250     91400   22.0300 -109.1700       7.3        37       126        60
OIR    2025250     91400   22.0300 -109.1800       7.2        38       126        60
OIR    2025250     91400   22.0300 -109.1900       7.2        38       126        60
OIR    2025250     91400   22.0300 -109.2000       7.2        38       127        60
OIR    2025250     91400   22.0300 -109.2100       7.2        38       128        60
OIR    2025250     91400   22.0300 -109.2200       7.2        38       129        60
OIR    2025250     91400   22.0300 -109.2300       7.2        38       130        60
OIR    2025250     91400   22.0300 -109.2400       7.2        38       130        60
OIR    2025250     91400   22.0300 -109.2500       7.2        38       130        60
OIR    2025250     91400   22.0300 -109.2600       7.2        38       129        60
OIR    2025250     91400   22.0300 -109.2700       7.1        38       128        60
OIR    2025250     91400   22.0300 -109.2800       7.1        38       127        60
OIR    2025250     91400   22.0300 -109.2900       7.1        38       126        60
OIR    2025250     91400   22.0300 -109.3000       7.1        38       126        60
OIR    2025250     91400   22.0300 -109.3100       7.1        38       126        60
OIR    2025250     91400   22.0300 -109.3200       7.1        39       127        60
OIR    2025250     91400   22.0300 -109.3300       7.1        39       127        60
OIR    2025250     91400   22.0300 -109.3400       7.1        39       127        60
OIR    2025250     91400   22.0300 -109.3500       7.1        39       127        60
OIR    2025250     91400   22.0300 -109.3600       7.1        39       127        60
OIR    2025250     91400   22.0300 -109.3700       7.1        39       127        60
OIR    2025250     91400   22.0300 -109.3800       7.1        39       128        60
OIR    2025250     91400   22.0300 -109.3900       7.1        40       129        60
OIR    2025250     91400   22.0300 -109.4000       7.1        40       129        60
OIR    2025250     91400   22.0300 -109.4100       7.1        40       129        60
OIR    2025250     91400   22.0300 -109.4200       7.1        40       129        60
OIR    2025250     91400   22.0300 -109.4300       7.0        40       127        60
OIR    2025250     91400   22.0300 -109.4400       7.0        40       126        60
OIR    2025250     91400   22.0300 -109.4500       7.0        40       124        60
OIR    2025250     91400   22.0300 -109.4600       7.0        40       124        60
OIR    2025250     91400   22.0300 -109.4700       7.0        40       123        60
OIR    2025250     91400   22.0300 -109.4800       7.0        40       122        60
OIR    2025250     91400   22.0300 -109.4900       7.0        40       121        60
OIR    2025250     91400   22.0300 -109.5000       7.0        40       120        60
OIR    2025250     91400   22.0300 -109.5100       7.0        40       119        60
OIR    2025250     91400   22.0300 -109.5200       7.0        40       117        60
OIR    2025250     91400   22.0300 -109.5300       7.0        40       116        60
OIR    2025250     91400   22.0300 -109.5400       6.9        40       116        60
OIR    2025250     91400   22.0300 -109.5500       6.9        40       116        60
OIR    2025250     91400   22.0300 -109.5600       6.9        40       117        60
OIR    2025250     91400   22.0300 -109.5700       6.8        40       117        60
OIR    2025250     91400   22.0300 -109.5800       6.7        40       117        60
OIR    2025250     91400   22.0300 -109.5900       6.4        40       116        60
OIR    2025250     91400   22.0300 -109.6000       5.8        41       117        60
OIR    2025250     91400   22.0300 -109.6100       5.2        42       120        60
OIR    2025250     91400   22.0300 -109.6200       4.9        43       123        60
OIR    2025250     91400   22.0300 -109.6300       4.6        44       124        60
OIR    2025250     91400   22.0300 -109.6400       4.4        45       125        60
OIR    2025250     91400   22.0300 -109.6500       4.3        45       125        60
OIR    2025250     91400   22.0300 -109.6600       4.1        45       124        60
OIR    2025250     91400   22.0300 -109.6700       4.0        46       124        60
OIR    2025250     91400   22.0300 -109.9700       4.0        47       131        60
OIR    2025250     91400   22.0300 -109.9800       4.1        47       132        60
OIR    2025250     91400   22.0300 -109.9900       4.2        47       133        60
OIR    2025250     91400   22.0300 -110.0000       4.3        47       133        60
OIR    2025250     91400   22.0300 -110.0100       4.5        48       133        60
OIR    2025250     91400   22.0300 -110.0200       4.5        48       133        60
OIR    2025250     91400   22.0300 -110.0300       4.6        48       134        60
OIR    2025250     91400   22.0300 -110.0400       4.5        49       134        60
OIR    2025250     91400   22.0300 -110.0500       4.5        50       133        60
OIR    2025250     91400   22.0300 -110.0600       4.5        51       132        60
OIR    2025250     91400   22.0300 -110.0700       4.5        52       132        60
OIR    2025250     91400   22.0300 -110.0800       4.5        53       132        60
OIR    2025250     91400   22.0300 -110.0900       4.5        53       133        60
OIR    2025250     91400   22.0300 -110.1000       4.5        54       133        60
OIR    2025250     91400   22.0300 -110.1100       4.4        55       133        60
OIR    2025250     91400   22.0300 -110.1200       4.4        56       132        60
OIR    2025250     91400   22.0300 -110.1300       4.4        56       132        60
OIR    2025250     91400   22.0300 -110.1400       4.4        57       132        60
OIR    2025250     91400   22.0300 -110.1500       4.4        57       133        60
OIR    2025250     91400   22.0300 -110.1600       4.4        57       134        60
OIR    2025250     91400   22.0300 -110.1700       4.4        57       136        60
OIR    2025250     91400   22.0300 -110.1800       4.4        57       138        60
OIR    2025250     91400   22.0200 -109.0000       7.1        39       138        60
OIR    2025250     91400   22.0200 -109.0100       7.1        39       137        60
OIR    2025250     91400   22.0200 -109.0200       7.1        40       136        60
OIR    2025250     91400   22.0200 -109.0300       7.1        39       135        60
OIR    2025250     91400   22.0200 -109.0400       7.1        39       133        60
OIR    2025250     91400   22.0200 -109.0500       7.1        39       130        60
OIR    2025250     91400   22.0200 -109.0600       7.1        39       131        60
OIR    2025250     91400   22.0200 -109.0700       7.1        39       131        60
OIR    2025250     91400   22.0200 -109.0800       7.2        39       131        60
OIR    2025250     91400   22.0200 -109.0900       7.2        39       129        60
OIR    2025250     91400   22.0200 -109.1000       7.2        39       128        60
OIR    2025250     91400   22.0200 -109.1100       7.2        39       127        60
OIR    2025250     91400   22.0200 -109.1200       7.3        39       127        60
OIR    2025250     91400   22.0200 -109.1300       7.3        39       126        60
OIR    2025250     91400   22.0200 -109.1400       7.3        39       125        60
OIR    2025250     91400   22.0200 -109.1500       7.3        39       123        60
OIR    2025250     91400   22.0200 -109.1600       7.3        38       124        60
OIR    2025250     91400   22.0200 -109.1700       7.3        38       125        60
OIR    2025250     91400   22.0200 -109.1800       7.2        38       125        60
OIR    2025250     91400   22.0200 -109.1900       7.2        38       125        60
OIR    2025250     91400   22.0200 -109.2000       7.2        38       125        60
OIR    2025250     91400   22.0200 -109.2100       7.2        38       126        60
OIR    2025250     91400   22.0200 -109.2200       7.2        38       128        60
OIR    2025250     91400   22.0200 -109.2300       7.2        38       128        60
OIR    2025250     91400   22.0200 -109.2400       7.2        38       128        60
OIR    2025250     91400   22.0200 -109.2500       7.2        38       128        60
OIR    2025250     91400   22.0200 -109.2600       7.2        38       128        60
OIR    2025250     91400   22.0200 -109.2700       7.2        38       128        60
OIR    2025250     91400   22.0200 -109.2800       7.2        38       127        60
OIR    2025250     91400   22.0200 -109.2900       7.1        38       126        60
OIR    2025250     91400   22.0200 -109.3000       7.1        39       125        60
OIR    2025250     91400   22.0200 -109.3100       7.1        39       125        60
OIR    2025250     91400   22.0200 -109.3200       7.1        39       125        60
OIR    2025250     91400   22.0200 -109.3300       7.1        39       125        60
OIR    2025250     91400   22.0200 -109.3400       7.1        39       125        60
OIR    2025250     91400   22.0200 -109.3500       7.1        39       124        60
OIR    2025250     91400   22.0200 -109.3600       7.1        39       125        60
OIR    2025250     91400   22.0200 -109.3700       7.1        39       126        60
OIR    2025250     91400   22.0200 -109.3800       7.1        39       127        60
OIR    2025250     91400   22.0200 -109.3900       7.1        40       128        60
OIR    2025250     91400   22.0200 -109.4000       7.1        40       129        60
OIR    2025250     91400   22.0200 -109.4100       7.1        40       129        60
OIR    2025250     91400   22.0200 -109.4200       7.1        40       128        60
OIR    2025250     91400   22.0200 -109.4300       7.1        40       126        60
OIR    2025250     91400   22.0200 -109.4400       7.0        40       125        60
OIR    2025250     91400   22.0200 -109.4500       7.0        40       124        60
OIR    2025250     91400   22.0200 -109.4600       7.0        40       124        60
OIR    2025250     91400   22.0200 -109.4700       7.0        40       124        60
OIR    2025250     91400   22.0200 -109.4800       7.0        40       123        60
OIR    2025250     91400   22.0200 -109.4900       7.0        40       121        60
OIR    2025250     91400   22.0200 -109.5000       7.0        40       119        60
OIR    2025250     91400   22.0200 -109.5100       7.0        40       117        60
OIR    2025250     91400   22.0200 -109.5200       7.0        40       116        60
OIR    2025250     91400   22.0200 -109.5300       7.0        40       116        60
OIR    2025250     91400   22.0200 -109.5400       6.9        40       116        60
OIR    2025250     91400   22.0200 -109.5500       6.9        40       116        60
OIR    2025250     91400   22.0200 -109.5600       6.9        40       116        60
OIR    2025250     91400   22.0200 -109.5700       6.8        40       117        60
OIR    2025250     91400   22.0200 -109.5800       6.6        40       117        60
OIR    2025250     91400   22.0200 -109.5900       6.2        41       119        60
OIR    2025250     91400   22.0200 -109.6000       5.5        41       120        60
OIR    2025250     91400   22.0200 -109.6100       5.0        43       122        60
OIR    2025250     91400   22.0200 -109.6200       4.7        43       124        60
OIR    2025250     91400   22.0200 -109.6300       4.5        44       125        60
OIR    2025250     91400   22.0200 -109.6400       4.3        45       124        60
OIR    2025250     91400   22.0200 -109.6500       4.2        45       123        60
OIR    2025250     91400   22.0200 -109.6600       4.1        46       123        60
OIR    2025250     91400   22.0200 -109.9700       4.0        48       131        60
OIR    2025250     91400   22.0200 -109.9800       4.0        49       132        60
OIR    2025250     91400   22.0200 -109.9900       4.1        49       132        60
OIR    2025250     91400   22.0200 -110.0000       4.2        50       133        60
OIR    2025250     91400   22.0200 -110.0100       4.3        50       133        60
OIR    2025250     91400   22.0200 -110.0200       4.3        50       133        60
OIR    2025250     91400   22.0200 -110.0300       4.4        51       134        60
OIR    2025250     91400   22.0200 -110.0400       4.4        51       135        60
OIR    2025250     91400   22.0200 -110.0500       4.4        52       134        60
OIR    2025250     91400   22.0200 -110.0600       4.4        53       134        60
OIR    2025250     91400   22.0200 -110.0700       4.4        54       133        60
OIR    2025250     91400   22.0200 -110.0800       4.4        54       134        60
OIR    2025250     91400   22.0200 -110.0900       4.4        55       134        60
OIR    2025250     91400   22.0200 -110.1000       4.3        55       134        60
OIR    2025250     91400   22.0200 -110.1100       4.3        56       134        60
OIR    2025250     91400   22.0200 -110.1200       4.3        56       134        60
OIR    2025250     91400   22.0200 -110.1300       4.3        57       134        60
OIR    2025250     91400   22.0200 -110.1400       4.3        57       134        60
OIR    2025250     91400   22.0200 -110.1500       4.3        57       134        60
OIR    2025250     91400   22.0200 -110.1600       4.3        57       134        60
OIR    2025250     91400   22.0200 -110.1700       4.3        58       135        60
OIR    2025250     91400   22.0200 -110.1800       4.3        58       137        60
OIR    2025250     91400   22.0200 -110.1900       4.3        58       139        60
OIR    2025250     91400   22.0200 -110.2000       4.3        59       139        60
OIR    2025250     91400   22.0200 -110.2100       4.2        59       139        60
OIR    2025250     91400   22.0200 -110.2200       4.1        61       139        60
OIR    2025250     91400   22.0100 -108.9600       7.1        37       138        60
OIR    2025250     91400   22.0100 -108.9700       7.1        39       137        60
OIR    2025250     91400   22.0100 -108.9800       7.2        39       136        60
OIR    2025250     91400   22.0100 -108.9900       7.2        40       135        60
OIR    2025250     91400   22.0100 -109.0000       7.2        40       134        60
OIR    2025250     91400   22.0100 -109.0100       7.2        40       133        60
OIR    2025250     91400   22.0100 -109.0200       7.2        40       132        60
OIR    2025250     91400   22.0100 -109.0300       7.2        40       131        60
OIR    2025250     91400   22.0100 -109.0400       7.2        40       129        60
OIR    2025250     91400   22.0100 -109.0500       7.2        40       128        60
OIR    2025250     91400   22.0100 -109.0600       7.2        39       127        60
OIR    2025250     91400   22.0100 -109.0700       7.2        39       128        60
OIR    2025250     91400   22.0100 -109.0800       7.2        39       127        60
OIR    2025250     91400   22.0100 -109.0900       7.2        39       126        60
OIR    2025250     91400   22.0100 -109.1000       7.2        39       125        60
OIR    2025250     91400   22.0100 -109.1100       7.2        39       125        60
OIR    2025250     91400   22.0100 -109.1200       7.3        39       124        60
OIR    2025250     91400   22.0100 -109.1300       7.3        39       124        60
OIR    2025250     91400   22.0100 -109.1400       7.3        39       123        60
OIR    2025250     91400   22.0100 -109.1500       7.3        39       122        60
OIR    2025250     91400   22.0100 -109.1600       7.3        39       122        60
OIR    2025250     91400   22.0100 -109.1700       7.3        39       123        60
OIR    2025250     91400   22.0100 -109.1800       7.2        39       124        60
OIR    2025250     91400   22.0100 -109.1900       7.2        39       124        60
OIR    2025250     91400   22.0100 -109.2000       7.2        38       124        60
OIR    2025250     91400   22.0100 -109.2100       7.2        38       125        60
OIR    2025250     91400   22.0100 -109.2200       7.2        38       126        60
OIR    2025250     91400   22.0100 -109.2300       7.2        38       127        60
OIR    2025250     91400   22.0100 -109.2400       7.2        38       127        60
OIR    2025250     91400   22.0100 -109.2500       7.2        38       127        60
OIR    2025250     91400   22.0100 -109.2600       7.2        38       127        60
OIR    2025250     91400   22.0100 -109.2700       7.2        39       126        60
OIR    2025250     91400   22.0100 -109.2800       7.2        39       126        60
OIR    2025250     91400   22.0100 -109.2900       7.2        39       125        60
OIR    2025250     91400   22.0100 -109.3000       7.1        39       125        60
OIR    2025250     91400   22.0100 -109.3100       7.1        39       124        60
OIR    2025250     91400   22.0100 -109.3200       7.1        39       125        60
OIR    2025250     91400   22.0100 -109.3300       7.1        39       125        60
OIR    2025250     91400   22.0100 -109.3400       7.1        39       125        60
OIR    2025250     91400   22.0100 -109.3500       7.1        39       124        60
OIR    2025250     91400   22.0100 -109.3600       7.1        39       125        60
OIR    2025250     91400   22.0100 -109.3700       7.1        39       126        60
OIR    2025250     91400   22.0100 -109.3800       7.1        40       126        60
OIR    2025250     91400   22.0100 -109.3900       7.1        40       128        60
OIR    2025250     91400   22.0100 -109.4000       7.1        40       129        60
OIR    2025250     91400   22.0100 -109.4100       7.1        40       129        60
OIR    2025250     91400   22.0100 -109.4200       7.1        40       129        60
OIR    2025250     91400   22.0100 -109.4300       7.1        40       129        60
OIR    2025250     91400   22.0100 -109.4400       7.0        40       127        60
OIR    2025250     91400   22.0100 -109.4500       7.0        40       126        60
OIR    2025250     91400   22.0100 -109.4600       7.0        40       125        60
OIR    2025250     91400   22.0100 -109.4700       7.0        40       125        60
OIR    2025250     91400   22.0100 -109.4800       7.0        40       124        60
OIR    2025250     91400   22.0100 -109.4900       7.0        40       122        60
OIR    2025250     91400   22.0100 -109.5000       7.0        40       120        60
OIR    2025250     91400   22.0100 -109.5100       7.0        40       119        60
OIR    2025250     91400   22.0100 -109.5200       7.0        40       117        60
OIR    2025250     91400   22.0100 -109.5300       7.0        40       116        60
OIR    2025250     91400   22.0100 -109.5400       6.9        40       116        60
OIR    2025250     91400   22.0100 -109.5500       6.9        40       116        60
OIR    2025250     91400   22.0100 -109.5600       6.8        40       116        60
OIR    2025250     91400   22.0100 -109.5700       6.8        40       117        60
OIR    2025250     91400   22.0100 -109.5800       6.5        41       119        60
OIR    2025250     91400   22.0100 -109.5900       6.0        41       120        60
OIR    2025250     91400   22.0100 -109.6000       5.3        42       121        60
OIR    2025250     91400   22.0100 -109.6100       4.9        43       123        60
OIR    2025250     91400   22.0100 -109.6200       4.6        44       125        60
OIR    2025250     91400   22.0100 -109.6300       4.4        45       125        60
OIR    2025250     91400   22.0100 -109.6400       4.2        45       124        60
OIR    2025250     91400   22.0100 -109.6500       4.1        46       122        60
OIR    2025250     91400   22.0100 -109.6600       4.0        46       122        60
OIR    2025250     91400   22.0100 -109.9800       4.0        50       132        60
OIR    2025250     91400   22.0100 -109.9900       4.0        51       132        60
OIR    2025250     91400   22.0100 -110.0000       4.1        51       132        60
OIR    2025250     91400   22.0100 -110.0100       4.2        51       132        60
OIR    2025250     91400   22.0100 -110.0200       4.2        51       133        60
OIR    2025250     91400   22.0100 -110.0300       4.3        52       134        60
OIR    2025250     91400   22.0100 -110.0400       4.3        52       135        60
OIR    2025250     91400   22.0100 -110.0500       4.3        53       135        60
OIR    2025250     91400   22.0100 -110.0600       4.3        54       135        60
OIR    2025250     91400   22.0100 -110.0700       4.3        54       135        60
OIR    2025250     91400   22.0100 -110.0800       4.3        55       135        60
OIR    2025250     91400   22.0100 -110.0900       4.3        55       136        60
OIR    2025250     91400   22.0100 -110.1000       4.3        56       136        60
OIR    2025250     91400   22.0100 -110.1100       4.3        56       135        60
OIR    2025250     91400   22.0100 -110.1200       4.3        57       135        60
OIR    2025250     91400   22.0100 -110.1300       4.3        57       135        60
OIR    2025250     91400   22.0100 -110.1400       4.3        57       135        60
OIR    2025250     91400   22.0100 -110.1500       4.3        57       136        60
OIR    2025250     91400   22.0100 -110.1600       4.3        58       135        60
OIR    2025250     91400   22.0100 -110.1700       4.3        58       135        60
OIR    2025250     91400   22.0100 -110.1800       4.3        58       137        60
OIR    2025250     91400   22.0100 -110.1900       4.3        59       138        60
OIR    2025250     91400   22.0100 -110.2000       4.2        59       139        60
OIR    2025250     91400   22.0100 -110.2100       4.2        60       138        60
OIR    2025250     91400   22.0100 -110.2200       4.1        61       137        60
OIR    2025250     91400   22.0100 -110.2300       4.1        62       138        60
OIR    2025250     91400   22.0100 -110.2400       4.0        62       138        60
OIR    2025250     91400   22.0100 -110.2500       4.0        63       139        60
OIR    2025250     91400   22.0000 -108.8900       7.1        32       138        60
OIR    2025250     91400   22.0000 -108.9000       7.1        32       137        60
OIR    2025250     91400   22.0000 -108.9100       7.1        31       136        60
OIR    2025250     91400   22.0000 -108.9200       7.2        30       137        60
OIR    2025250     91400   22.0000 -108.9300       7.3        30       138        60
OIR    2025250     91400   22.0000 -108.9400       7.2        33       137        60
OIR    2025250     91400   22.0000 -108.9500       7.2        37       135        60
OIR    2025250     91400   22.0000 -108.9600       7.2        39       134        60
OIR    2025250     91400   22.0000 -108.9700       7.2        39       133        60
OIR    2025250     91400   22.0000 -108.9800       7.2        40       131        60
OIR    2025250     91400   22.0000 -108.9900       7.2        40       131        60
OIR    2025250     91400   22.0000 -109.0000       7.2        40       130        60
OIR    2025250     91400   22.0000 -109.0100       7.2        40       129        60
OIR    2025250     91400   22.0000 -109.0200       7.2        40       126        60
OIR    2025250     91400   22.0000 -109.0300       7.2        40       124        60
OIR    2025250     91400   22.0000 -109.0400       7.2        40       125        60
OIR    2025250     91400   22.0000 -109.0500       7.2        40       125        60
OIR    2025250     91400   22.0000 -109.0600       7.2        40       125        60
OIR    2025250     91400   22.0000 -109.0700       7.2        40       125        60
OIR    2025250     91400   22.0000 -109.0800       7.2        40       124        60
OIR    2025250     91400   22.0000 -109.0900       7.2        40       123        60
OIR    2025250     91400   22.0000 -109.1000       7.2        39       121        60
OIR    2025250     91400   22.0000 -109.1100       7.3        39       121        60
OIR    2025250     91400   22.0000 -109.1200       7.3        39       121        60
OIR    2025250     91400   22.0000 -109.1300       7.3        39       121        60
OIR    2025250     91400   22.0000 -109.1400       7.3        39       121        60
OIR    2025250     91400   22.0000 -109.1500       7.3        39       121        60
OIR    2025250     91400   22.0000 -109.1600       7.3        39       121        60
OIR    2025250     91400   22.0000 -109.1700       7.3        39       121        60
OIR    2025250     91400   22.0000 -109.1800       7.3        39       120        60
OIR    2025250     91400   22.0000 -109.1900       7.2        39       121        60
OIR    2025250     91400   22.0000 -109.2000       7.2        39       121        60
OIR    2025250     91400   22.0000 -109.2100       7.2        39       122        60
OIR    2025250     91400   22.0000 -109.2200       7.2        39       123        60
OIR    2025250     91400   22.0000 -109.2300       7.2        39       125        60
OIR    2025250     91400   22.0000 -109.2400       7.2        39       125        60
OIR    2025250     91400   22.0000 -109.2500       7.2        39       125        60
OIR    2025250     91400   22.0000 -109.2600       7.2        39       125        60
OIR    2025250     91400   22.0000 -109.2700       7.2        39       125        60
OIR    2025250     91400   22.0000 -109.2800       7.2        39       125        60
OIR    2025250     91400   22.0000 -109.2900       7.2        39       124        60
OIR    2025250     91400   22.0000 -109.3000       7.1        39       123        60
OIR    2025250     91400   22.0000 -109.3100       7.1        39       123        60
OIR    2025250     91400   22.0000 -109.3200       7.1        39       124        60
OIR    2025250     91400   22.0000 -109.3300       7.1        39       125        60
OIR    2025250     91400   22.0000 -109.3400       7.1        39       125        60
OIR    2025250     91400   22.0000 -109.3500       7.1        39       124        60
OIR    2025250     91400   22.0000 -109.3600       7.1        39       125        60
OIR    2025250     91400   22.0000 -109.3700       7.1        40       125        60
OIR    2025250     91400   22.0000 -109.3800       7.1        40       126        60
OIR    2025250     91400   22.0000 -109.3900       7.1        40       127        60
OIR    2025250     91400   22.0000 -109.4000       7.1        40       128        60
OIR    2025250     91400   22.0000 -109.4100       7.1        40       129        60
OIR    2025250     91400   22.0000 -109.4200       7.1        40       130        60
OIR    2025250     91400   22.0000 -109.4300       7.1        40       130        60
OIR    2025250     91400   22.0000 -109.4400       7.0        40       130        60
OIR    2025250     91400   22.0000 -109.4500       7.0        40       128        60
OIR    2025250     91400   22.0000 -109.4600       7.0        40       127        60
OIR    2025250     91400   22.0000 -109.4700       7.0        40       126        60
OIR    2025250     91400   22.0000 -109.4800       7.0        40       126        60
OIR    2025250     91400   22.0000 -109.4900       7.0        40       123        60
OIR    2025250     91400   22.0000 -109.5000       7.0        40       121        60
OIR    2025250     91400   22.0000 -109.5100       7.0        40       120        60
OIR    2025250     91400   22.0000 -109.5200       7.0        40       120        60
OIR    2025250     91400   22.0000 -109.5300       7.0        40       120        60
OIR    2025250     91400   22.0000 -109.5400       6.9        40       117        60
OIR    2025250     91400   22.0000 -109.5500       6.9        40       116        60
OIR    2025250     91400   22.0000 -109.5600       6.8        40       116        60
OIR    2025250     91400   22.0000 -109.5700       6.7        40       117        60
OIR    2025250     91400   22.0000 -109.5800       6.5        41       120        60
OIR    2025250     91400   22.0000 -109.5900       5.9        41       121        60
OIR    2025250     91400   22.0000 -109.6000       5.2        42       122        60
OIR    2025250     91400   22.0000 -109.6100       4.8        43       123        60
OIR    2025250     91400   22.0000 -109.6200       4.5        44       124        60
OIR    2025250     91400   22.0000 -109.6300       4.3        45       125        60
OIR    2025250     91400   22.0000 -109.6400       4.2        45       124        60
OIR    2025250     91400   22.0000 -109.6500       4.1        46       123        60
OIR    2025250     91400   22.0000 -109.6600       4.0        46       122        60
OIR    2025250     91400   22.0000 -109.9900       4.0        51       132        60
OIR    2025250     91400   22.0000 -110.0000       4.0        52       131        60
OIR    2025250     91400   22.0000 -110.0100       4.1        52       132        60
OIR    2025250     91400   22.0000 -110.0200       4.1        52       133        60
OIR    2025250     91400   22.0000 -110.0300       4.2        53       134        60
OIR    2025250     91400   22.0000 -110.0400       4.3        53       135        60
OIR    2025250     91400   22.0000 -110.0500       4.3        54       135        60
OIR    2025250     91400   22.0000 -110.0600       4.3        54       136        60
OIR    2025250     91400   22.0000 -110.0700       4.3        55       136        60
OIR    2025250     91400   22.0000 -110.0800       4.3        55       136        60
OIR    2025250     91400   22.0000 -110.0900       4.3        56       137        60
OIR    2025250     91400   22.0000 -110.1000       4.3        56       138        60
OIR    2025250     91400   22.0000 -110.1100       4.3        56       137        60
OIR    2025250     91400   22.0000 -110.1200       4.3        57       136        60
OIR    2025250     91400   22.0000 -110.1300       4.3        57       135        60
OIR    2025250     91400   22.0000 -110.1400       4.3        57       135        60
OIR    2025250     91400   22.0000 -110.1500       4.3        57       135        60
OIR    2025250     91400   22.0000 -110.1600       4.3        58       135        60
OIR    2025250     91400   22.0000 -110.1700       4.3        58       136        60
OIR    2025250     91400   22.0000 -110.1800       4.3        58       137        60
OIR    2025250     91400   22.0000 -110.1900       4.2        59       139        60
OIR    2025250     91400   22.0000 -110.2100       4.2        60       140        60
OIR    2025250     91400   22.0000 -110.2200       4.1        60       138        60
OIR    2025250     91400   22.0000 -110.2300       4.1        61       138        60
OIR    2025250     91400   22.0000 -110.2400       4.0        62       138        60
OIR    2025250     91400   22.0000 -110.2500       4.0        63       138        60
OIR    2025250     91400   21.9900 -108.7800       8.3        23       138        60
OIR    2025250     91400   21.9900 -108.7900       8.3        23       137        60
OIR    2025250     91400   21.9900 -108.8000       8.3        23       137        60
OIR    2025250     91400   21.9900 -108.8100       8.4        23       137        60
OIR    2025250     91400   21.9900 -108.8200       8.4        23       136        60
OIR    2025250     91400   21.9900 -108.8300       8.3        23       136        60
OIR    2025250     91400   21.9900 -108.8400       8.3        23       135        60
OIR    2025250     91400   21.9900 -108.8500       8.1        25       134        60
OIR    2025250     91400   21.9900 -108.8600       7.8        28       133        60
OIR    2025250     91400   21.9900 -108.8700       7.5        32       133        60
OIR    2025250     91400   21.9900 -108.8800       7.2        36       134        60
OIR    2025250     91400   21.9900 -108.8900       7.2        37       133        60
OIR    2025250     91400   21.9900 -108.9000       7.2        38       133        60
OIR    2025250     91400   21.9900 -108.9100       7.2        36       132        60
OIR    2025250     91400   21.9900 -108.9200       7.2        36       132        60
OIR    2025250     91400   21.9900 -108.9300       7.3        37       132        60
OIR    2025250     91400   21.9900 -108.9400       7.3        37       132        60
OIR    2025250     91400   21.9900 -108.9500       7.2        39       131        60
OIR    2025250     91400   21.9900 -108.9600       7.2        39       130        60
OIR    2025250     91400   21.9900 -108.9700       7.2        39       129        60
OIR    2025250     91400   21.9900 -108.9800       7.2        40       128        60
OIR    2025250     91400   21.9900 -108.9900       7.2        40       127        60
OIR    2025250     91400   21.9900 -109.0000       7.2        40       127        60
OIR    2025250     91400   21.9900 -109.0100       7.2        40       126        60
OIR    2025250     91400   21.9900 -109.0200       7.2        40       123        60
OIR    2025250     91400   21.9900 -109.0300       7.2        40       120        60
OIR    2025250     91400   21.9900 -109.0400       7.2        40       120        60
OIR    2025250     91400   21.9900 -109.0500       7.2        40       121        60
OIR    2025250     91400   21.9900 -109.0600       7.2        40       123        60
OIR    2025250     91400   21.9900 -109.0700       7.2        40       122        60
OIR    2025250     91400   21.9900 -109.0800       7.2        40       121        60
OIR    2025250     91400   21.9900 -109.0900       7.2        40       120        60
OIR    2025250     91400   21.9900 -109.1000       7.3        40       119        60
OIR    2025250     91400   21.9900 -109.1100       7.3        39       117        60
OIR    2025250     91400   21.9900 -109.1200       7.3        39       116        60
OIR    2025250     91400   21.9900 -109.1300       7.3        39       116        60
OIR    2025250     91400   21.9900 -109.1400       7.3        39       119        60
OIR    2025250     91400   21.9900 -109.1500       7.3        39       120        60
OIR    2025250     91400   21.9900 -109.1600       7.3        39       121        60
OIR    2025250     91400   21.9900 -109.1700       7.3        39       119        60
OIR    2025250     91400   21.9900 -109.1800       7.3        39       116        60
OIR    2025250     91400   21.9900 -109.1900       7.2        39       116        60
OIR    2025250     91400   21.9900 -109.2000       7.2        39       116        60
OIR    2025250     91400   21.9900 -109.2100       7.2        39       117        60
OIR    2025250     91400   21.9900 -109.2200       7.2        39       121        60
OIR    2025250     91400   21.9900 -109.2300       7.2        39       123        60
OIR    2025250     91400   21.9900 -109.2400       7.2        39       124        60
OIR    2025250     91400   21.9900 -109.2500       7.2        39       123        60
OIR    2025250     91400   21.9900 -109.2600       7.2        39       122        60
OIR    2025250     91400   21.9900 -109.2700       7.2        39       122        60
OIR    2025250     91400   21.9900 -109.2800       7.2        39       122        60
OIR    2025250     91400   21.9900 -109.2900       7.2        39       122        60
OIR    2025250     91400   21.9900 -109.3000       7.2        39       121        60
OIR    2025250     91400   21.9900 -109.3100       7.1        39       120        60
OIR    2025250     91400   21.9900 -109.3200       7.1        39       122        60
OIR    2025250     91400   21.9900 -109.3300       7.1        39       124        60
OIR    2025250     91400   21.9900 -109.3400       7.1        39       124        60
OIR    2025250     91400   21.9900 -109.3500       7.1        39       124        60
OIR    2025250     91400   21.9900 -109.3600       7.1        40       124        60
OIR    2025250     91400   21.9900 -109.3700       7.1        40       125        60
OIR    2025250     91400   21.9900 -109.3800       7.1        40       126        60
OIR    2025250     91400   21.9900 -109.3900       7.1        40       127        60
OIR    2025250     91400   21.9900 -109.4000       7.1        40       127        60
OIR    2025250     91400   21.9900 -109.4100       7.1        40       128        60
OIR    2025250     91400   21.9900 -109.4200       7.1        40       129        60
OIR    2025250     91400   21.9900 -109.4300       7.1        40       130        60
OIR    2025250     91400   21.9900 -109.4400       7.1        40       130        60
OIR    2025250     91400   21.9900 -109.4500       7.0        40       130        60
OIR    2025250     91400   21.9900 -109.4600       7.0        40       129        60
OIR    2025250     91400   21.9900 -109.4700       7.0        40       128        60
OIR    2025250     91400   21.9900 -109.4800       7.0        40       127        60
OIR    2025250     91400   21.9900 -109.4900       7.0        40       126        60
OIR    2025250     91400   21.9900 -109.5000       7.0        40       123        60
OIR    2025250     91400   21.9900 -109.5100       7.0        40       122        60
OIR    2025250     91400   21.9900 -109.5200       7.0        40       121        60
OIR    2025250     91400   21.9900 -109.5300       7.0        40       120        60
OIR    2025250     91400   21.9900 -109.5400       6.9        40       119        60
OIR    2025250     91400   21.9900 -109.5500       6.9        40       116        60
OIR    2025250     91400   21.9900 -109.5600       6.8        40       116        60
OIR    2025250     91400   21.9900 -109.5700       6.7        40       117        60
OIR    2025250     91400   21.9900 -109.5800       6.5        41       119        60
OIR    2025250     91400   21.9900 -109.5900       6.0        41       120        60
OIR    2025250     91400   21.9900 -109.6000       5.2        42       122        60
OIR    2025250     91400   21.9900 -109.6100       4.7        44       123        60
OIR    2025250     91400   21.9900 -109.6200       4.5        44       123        60
OIR    2025250     91400   21.9900 -109.6300       4.3        45       123        60
OIR    2025250     91400   21.9900 -109.6400       4.2        45       123        60
OIR    2025250     91400   21.9900 -109.6500       4.1        46       122        60
OIR    2025250     91400   21.9900 -109.6600       4.0        46       122        60
OIR    2025250     91400   21.9900 -109.9900       4.0        52       132        60
OIR    2025250     91400   21.9900 -110.0000       4.0        52       132        60
OIR    2025250     91400   21.9900 -110.0100       4.1        52       133        60
OIR    2025250     91400   21.9900 -110.0200       4.1        53       135        60
OIR    2025250     91400   21.9900 -110.0300       4.1        53       136        60
OIR    2025250     91400   21.9900 -110.0400       4.2        54       136        60
OIR    2025250     91400   21.9900 -110.0500       4.2        54       137        60
OIR    2025250     91400   21.9900 -110.0600       4.2        55       137        60
OIR    2025250     91400   21.9900 -110.0700       4.3        55       137        60
OIR    2025250     91400   21.9900 -110.0800       4.3        56       137        60
OIR    2025250     91400   21.9900 -110.0900       4.3        56       138        60
OIR    2025250     91400   21.9900 -110.1000       4.3        56       138        60
OIR    2025250     91400   21.9900 -110.1100       4.3        57       138        60
OIR    2025250     91400   21.9900 -110.1200       4.3        57       136        60
OIR    2025250     91400   21.9900 -110.1300       4.3        57       135        60
OIR    2025250     91400   21.9900 -110.1400       4.3        57       135        60
OIR    2025250     91400   21.9900 -110.1500       4.3        58       135        60
OIR    2025250     91400   21.9900 -110.1600       4.3        58       135        60
OIR    2025250     91400   21.9900 -110.1700       4.3        58       136        60
OIR    2025250     91400   21.9900 -110.1800       4.2        58       138        60
OIR    2025250     91400   21.9900 -110.2200       4.1        60       140        60
OIR    2025250     91400   21.9900 -110.2300       4.1        61       138        60
OIR    2025250     91400   21.9900 -110.2400       4.0        62       138        60
OIR    2025250     91400   21.9900 -110.2500       4.0        63       137        60
OIR    2025250     91400   21.9900 -110.2600       4.0        63       138        60
OIR    2025250     91400   21.9900 -110.2700       4.0        63       139        60
OIR    2025250     91400   21.9800 -108.7500       7.8        30       137        60
OIR    2025250     91400   21.9800 -108.7600       7.8        30       135        60
OIR    2025250     91400   21.9800 -108.7700       7.8        29       133        60
OIR    2025250     91400   21.9800 -108.7800       8.1        26       131        60
OIR    2025250     91400   21.9800 -108.7900       8.4        24       130        60
OIR    2025250     91400   21.9800 -108.8000       8.4        23       130        60
OIR    2025250     91400   21.9800 -108.8100       8.4        23       130        60
OIR    2025250     91400   21.9800 -108.8200       8.4        23       129        60
OIR    2025250     91400   21.9800 -108.8300       8.4        23       129        60
OIR    2025250     91400   21.9800 -108.8400       8.3        25       128        60
OIR    2025250     91400   21.9800 -108.8500       7.9        29       127        60
OIR    2025250     91400   21.9800 -108.8600       7.5        34       126        60
OIR    2025250     91400   21.9800 -108.8700       7.3        37       127        60
OIR    2025250     91400   21.9800 -108.8800       7.3        38       128        60
OIR    2025250     91400   21.9800 -108.8900       7.3        38       128        60
OIR    2025250     91400   21.9800 -108.9000       7.3        38       128        60
OIR    2025250     91400   21.9800 -108.9100       7.3        38       128        60
OIR    2025250     91400   21.9800 -108.9200       7.3        38       127        60
OIR    2025250     91400   21.9800 -108.9300       7.3        38       127        60
OIR    2025250     91400   21.9800 -108.9400       7.3        39       126        60
OIR    2025250     91400   21.9800 -108.9500       7.3        39       127        60
OIR    2025250     91400   21.9800 -108.9600       7.3        39       127        60
OIR    2025250     91400   21.9800 -108.9700       7.3        39       126        60
OIR    2025250     91400   21.9800 -108.9800       7.2        40       124        60
OIR    2025250     91400   21.9800 -108.9900       7.2        40       124        60
OIR    2025250     91400   21.9800 -109.0000       7.2        40       124        60
OIR    2025250     91400   21.9800 -109.0100       7.2        40       124        60
OIR    2025250     91400   21.9800 -109.0200       7.2        40       122        60
OIR    2025250     91400   21.9800 -109.0300       7.2        40       117        60
OIR    2025250     91400   21.9800 -109.0400       7.2        40       116        60
OIR    2025250     91400   21.9800 -109.0500       7.2        40       117        60
OIR    2025250     91400   21.9800 -109.0600       7.2        40       119        60
OIR    2025250     91400   21.9800 -109.0700       7.3        40       120        60
OIR    2025250     91400   21.9800 -109.0800       7.3        40       120        60
OIR    2025250     91400   21.9800 -109.0900       7.3        40       120        60
OIR    2025250     91400   21.9800 -109.1000       7.3        40       119        60
OIR    2025250     91400   21.9800 -109.1100       7.3        40       119        60
OIR    2025250     91400   21.9800 -109.1200       7.3        39       117        60
OIR    2025250     91400   21.9800 -109.1300       7.3        39       116        60
OIR    2025250     91400   21.9800 -109.1400       7.3        39       116        60
OIR    2025250     91400   21.9800 -109.1500       7.3        39       119        60
OIR    2025250     91400   21.9800 -109.1600       7.3        39       120        60
OIR    2025250     91400   21.9800 -109.1700       7.3        39       119        60
OIR    2025250     91400   21.9800 -109.1800       7.3        39       119        60
OIR    2025250     91400   21.9800 -109.1900       7.3        39       117        60
OIR    2025250     91400   21.9800 -109.2000       7.2        39       117        60
OIR    2025250     91400   21.9800 -109.2100       7.2        39       117        60
OIR    2025250     91400   21.9800 -109.2200       7.2        39       120        60
OIR    2025250     91400   21.9800 -109.2300       7.2        39       122        60
OIR    2025250     91400   21.9800 -109.2400       7.2        39       123        60
OIR    2025250     91400   21.9800 -109.2500       7.2        39       122        60
OIR    2025250     91400   21.9800 -109.2600       7.2        39       122        60
OIR    2025250     91400   21.9800 -109.2700       7.2        39       122        60
OIR    2025250     91400   21.9800 -109.2800       7.2        39       121        60
OIR    2025250     91400   21.9800 -109.2900       7.2        39       121        60
OIR    2025250     91400   21.9800 -109.3000       7.2        39       120        60
OIR    2025250     91400   21.9800 -109.3100       7.1        39       120        60
OIR    2025250     91400   21.9800 -109.3200       7.1        39       121        60
OIR    2025250     91400   21.9800 -109.3300       7.1        39       124        60
OIR    2025250     91400   21.9800 -109.3400       7.1        39       124        60
OIR    2025250     91400   21.9800 -109.3500       7.1        40       124        60
OIR    2025250     91400   21.9800 -109.3600       7.1        40       123        60
OIR    2025250     91400   21.9800 -109.3700       7.1        40       125        60
OIR    2025250     91400   21.9800 -109.3800       7.1        40       126        60
OIR    2025250     91400   21.9800 -109.3900       7.1        40       127        60
OIR    2025250     91400   21.9800 -109.4000       7.1        40       127        60
OIR    2025250     91400   21.9800 -109.4100       7.1        40       127        60
OIR    2025250     91400   21.9800 -109.4200       7.1        40       128        60
OIR    2025250     91400   21.9800 -109.4300       7.1        40       129        60
OIR    2025250     91400   21.9800 -109.4400       7.1        40       130        60
OIR    2025250     91400   21.9800 -109.4500       7.0        40       131        60
OIR    2025250     91400   21.9800 -109.4600       7.0        40       132        60
OIR    2025250     91400   21.9800 -109.4700       7.0        40       131        60
OIR    2025250     91400   21.9800 -109.4800       7.0        40       129        60
OIR    2025250     91400   21.9800 -109.4900       7.0        40       128        60
OIR    2025250     91400   21.9800 -109.5000       7.0        40       126        60
OIR    2025250     91400   21.9800 -109.5100       7.0        40       124        60
OIR    2025250     91400   21.9800 -109.5200       7.0        40       122        60
OIR    2025250     91400   21.9800 -109.5300       7.0        40       120        60
OIR    2025250     91400   21.9800 -109.5400       6.9        40       117        60
OIR    2025250     91400   21.9800 -109.5500       6.9        40       116        60
OIR    2025250     91400   21.9800 -109.5600       6.8        40       116        60
OIR    2025250     91400   21.9800 -109.5700       6.7        40       116        60
OIR    2025250     91400   21.9800 -109.5800       6.6        41       116        60
OIR    2025250     91400   21.9800 -109.5900       6.1        41       116        60
OIR    2025250     91400   21.9800 -109.6000       5.4        42       119        60
OIR    2025250     91400   21.9800 -109.6100       4.9        43       121        60
OIR    2025250     91400   21.9800 -109.6200       4.5        44       121        60
OIR    2025250     91400   21.9800 -109.6300       4.3        45       121        60
OIR    2025250     91400   21.9800 -109.6400       4.2        45       121        60
OIR    2025250     91400   21.9800 -109.6500       4.1        46       121        60
OIR    2025250     91400   21.9800 -109.6600       4.0        46       121        60
OIR    2025250     91400   21.9800 -109.9900       4.0        52       132        60
OIR    2025250     91400   21.9800 -110.0000       4.0        52       133        60
OIR    2025250     91400   21.9800 -110.0100       4.0        53       135        60
OIR    2025250     91400   21.9800 -110.0200       4.1        53       137        60
OIR    2025250     91400   21.9800 -110.0300       4.1        54       138        60
OIR    2025250     91400   21.9800 -110.0400       4.2        54       138        60
OIR    2025250     91400   21.9800 -110.0500       4.2        55       138        60
OIR    2025250     91400   21.9800 -110.0600       4.2        55       138        60
OIR    2025250     91400   21.9800 -110.0700       4.2        56       138        60
OIR    2025250     91400   21.9800 -110.0800       4.2        56       139        60
OIR    2025250     91400   21.9800 -110.0900       4.2        56       138        60
OIR    2025250     91400   21.9800 -110.1000       4.2        57       138        60
OIR    2025250     91400   21.9800 -110.1100       4.3        57       137        60
OIR    2025250     91400   21.9800 -110.1200       4.3        57       136        60
OIR    2025250     91400   21.9800 -110.1300       4.3        57       135        60
OIR    2025250     91400   21.9800 -110.1400       4.3        57       135        60
OIR    2025250     91400   21.9800 -110.1500       4.3        58       134        60
OIR    2025250     91400   21.9800 -110.1600       4.3        58       135        60
OIR    2025250     91400   21.9800 -110.1700       4.2        58       136        60
OIR    2025250     91400   21.9800 -110.1800       4.2        59       138        60
OIR    2025250     91400   21.9800 -110.1900       4.2        59       139        60
OIR    2025250     91400   21.9800 -110.2400       4.1        62       140        60
OIR    2025250     91400   21.9800 -110.2500       4.0        62       139        60
OIR    2025250     91400   21.9800 -110.2600       4.0        63       139        60
OIR    2025250     91400   21.9800 -110.2700       4.0        63       140        60
OIR    2025250     91400   21.9700 -108.6600       6.6        35       137        60
OIR    2025250     91400   21.9700 -108.6700       6.7        34       136        60
OIR    2025250     91400   21.9700 -108.6800       6.8        33       136        60
OIR    2025250     91400   21.9700 -108.6900       6.9        33       135        60
OIR    2025250     91400   21.9700 -108.7000       6.9        32       136        60
OIR    2025250     91400   21.9700 -108.7100       7.1        32       135        60
OIR    2025250     91400   21.9700 -108.7200       7.4        31       135        60
OIR    2025250     91400   21.9700 -108.7300       7.5        31       135        60
OIR    2025250     91400   21.9700 -108.7400       7.7        31       135        60
OIR    2025250     91400   21.9700 -108.7500       7.7        32       133        60
OIR    2025250     91400   21.9700 -108.7600       7.7        32       131        60
OIR    2025250     91400   21.9700 -108.7700       7.7        32       130        60
OIR    2025250     91400   21.9700 -108.7800       7.9        30       129        60
OIR    2025250     91400   21.9700 -108.7900       8.3        26       128        60
OIR    2025250     91400   21.9700 -108.8000       8.4        25       128        60
OIR    2025250     91400   21.9700 -108.8100       8.3        26       128        60
OIR    2025250     91400   21.9700 -108.8200       8.2        27       127        60
OIR    2025250     91400   21.9700 -108.8300       7.9        30       127        60
OIR    2025250     91400   21.9700 -108.8400       7.8        32       126        60
OIR    2025250     91400   21.9700 -108.8500       7.6        35       124        60
OIR    2025250     91400   21.9700 -108.8600       7.5        37       122        60
OIR    2025250     91400   21.9700 -108.8700       7.4        38       122        60
OIR    2025250     91400   21.9700 -108.8800       7.3        38       123        60
OIR    2025250     91400   21.9700 -108.8900       7.3        38       124        60
OIR    2025250     91400   21.9700 -108.9000       7.3        39       124        60
OIR    2025250     91400   21.9700 -108.9100       7.3        39       124        60
OIR    2025250     91400   21.9700 -108.9200       7.3        39       123        60
OIR    2025250     91400   21.9700 -108.9300       7.3        39       123        60
OIR    2025250     91400   21.9700 -108.9400       7.3        39       123        60
OIR    2025250     91400   21.9700 -108.9500       7.3        39       123        60
OIR    2025250     91400   21.9700 -108.9600       7.3        39       124        60
OIR    2025250     91400   21.9700 -108.9700       7.3        39       123        60
OIR    2025250     91400   21.9700 -108.9800       7.3        40       121        60
OIR    2025250     91400   21.9700 -108.9900       7.3        40       120        60
OIR    2025250     91400   21.9700 -109.0000       7.3        40       120        60
OIR    2025250     91400   21.9700 -109.0100       7.3        40       121        60
OIR    2025250     91400   21.9700 -109.0200       7.3        40       120        60
OIR    2025250     91400   21.9700 -109.0300       7.3        40       117        60
OIR    2025250     91400   21.9700 -109.0400       7.3        40       116        60
OIR    2025250     91400   21.9700 -109.0500       7.3        40       116        60
OIR    2025250     91400   21.9700 -109.0600       7.3        40       116        60
OIR    2025250     91400   21.9700 -109.0700       7.3        40       116        60
OIR    2025250     91400   21.9700 -109.0800       7.3        40       117        60
OIR    2025250     91400   21.9700 -109.0900       7.3        40       120        60
OIR    2025250     91400   21.9700 -109.1000       7.3        40       119        60
OIR    2025250     91400   21.9700 -109.1100       7.3        40       119        60
OIR    2025250     91400   21.9700 -109.1200       7.3        40       119        60
OIR    2025250     91400   21.9700 -109.1300       7.3        39       117        60
OIR    2025250     91400   21.9700 -109.1400       7.3        39       116        60
OIR    2025250     91400   21.9700 -109.1500       7.3        39       116        60
OIR    2025250     91400   21.9700 -109.1600       7.3        39       117        60
OIR    2025250     91400   21.9700 -109.1700       7.3        39       119        60
OIR    2025250     91400   21.9700 -109.1800       7.3        39       120        60
OIR    2025250     91400   21.9700 -109.1900       7.3        39       120        60
OIR    2025250     91400   21.9700 -109.2000       7.3        39       120        60
OIR    2025250     91400   21.9700 -109.2100       7.2        39       120        60
OIR    2025250     91400   21.9700 -109.2200       7.2        39       120        60
OIR    2025250     91400   21.9700 -109.2300       7.2        39       121        60
OIR    2025250     91400   21.9700 -109.2400       7.2        39       121        60
OIR    2025250     91400   21.9700 -109.2500       7.2        39       122        60
OIR    2025250     91400   21.9700 -109.2600       7.2        39       123        60
OIR    2025250     91400   21.9700 -109.2700       7.2        39       122        60
OIR    2025250     91400   21.9700 -109.2800       7.2        39       121        60
OIR    2025250     91400   21.9700 -109.2900       7.2        39       120        60
OIR    2025250     91400   21.9700 -109.3000       7.2        39       121        60
OIR    2025250     91400   21.9700 -109.3100       7.2        39       121        60
OIR    2025250     91400   21.9700 -109.3200       7.1        39       122        60
OIR    2025250     91400   21.9700 -109.3300       7.1        40       123        60
OIR    2025250     91400   21.9700 -109.3400       7.1        40       124        60
OIR    2025250     91400   21.9700 -109.3500       7.1        40       124        60
OIR    2025250     91400   21.9700 -109.3600       7.1        40       124        60
OIR    2025250     91400   21.9700 -109.3700       7.1        40       125        60
OIR    2025250     91400   21.9700 -109.3800       7.1        40       125        60
OIR    2025250     91400   21.9700 -109.3900       7.1        40       126        60
OIR    2025250     91400   21.9700 -109.4000       7.1        40       126        60
OIR    2025250     91400   21.9700 -109.4100       7.1        40       126        60
OIR    2025250     91400   21.9700 -109.4200       7.1        40       127        60
OIR    2025250     91400   21.9700 -109.4300       7.1        40       128        60
OIR    2025250     91400   21.9700 -109.4400       7.1        40       129        60
OIR    2025250     91400   21.9700 -109.4500       7.1        40       130        60
OIR    2025250     91400   21.9700 -109.4600       7.0        40       131        60
OIR    2025250     91400   21.9700 -109.4700       7.0        40       131        60
OIR    2025250     91400   21.9700 -109.4800       7.0        40       130        60
OIR    2025250     91400   21.9700 -109.4900       7.0        40       130        60
OIR    2025250     91400   21.9700 -109.5000       7.0        40       128        60
OIR    2025250     91400   21.9700 -109.5100       7.0        40       127        60
OIR    2025250     91400   21.9700 -109.5200       7.0        40       124        60
OIR    2025250     91400   21.9700 -109.5300       7.0        40       121        60
OIR    2025250     91400   21.9700 -109.5400       6.9        40       119        60
OIR    2025250     91400   21.9700 -109.5500       6.9        40       117        60
OIR    2025250     91400   21.9700 -109.5600       6.9        40       117        60
OIR    2025250     91400   21.9700 -109.5700       6.8        40       116        60
OIR    2025250     91400   21.9700 -109.5800       6.6        40       116        60
OIR    2025250     91400   21.9700 -109.5900       6.3        41       116        60
OIR    2025250     91400   21.9700 -109.6000       5.8        41       117        60
OIR    2025250     91400   21.9700 -109.6100       5.2        42       120        60
OIR    2025250     91400   21.9700 -109.6200       4.7        43       120        60
OIR    2025250     91400   21.9700 -109.6300       4.3        45       120        60
OIR    2025250     91400   21.9700 -109.6400       4.2        45       119        60
OIR    2025250     91400   21.9700 -109.6500       4.1        46       119        60
OIR    2025250     91400   21.9700 -109.6600       4.0        46       119        60
OIR    2025250     91400   21.9700 -110.0000       4.0        52       133        60
OIR    2025250     91400   21.9700 -110.0100       4.0        53       134        60
OIR    2025250     91400   21.9700 -110.0200       4.0        53       135        60
OIR    2025250     91400   21.9700 -110.0300       4.1        54       137        60
OIR    2025250     91400   21.9700 -110.0400       4.1        55       138        60
OIR    2025250     91400   21.9700 -110.0500       4.2        55       139        60
OIR    2025250     91400   21.9700 -110.0600       4.2        55       140        60
OIR    2025250     91400   21.9700 -110.0700       4.2        56       140        60
OIR    2025250     91400   21.9700 -110.0800       4.2        56       140        60
OIR    2025250     91400   21.9700 -110.0900       4.2        56       139        60
OIR    2025250     91400   21.9700 -110.1000       4.2        57       138        60
OIR    2025250     91400   21.9700 -110.1100       4.2        57       137        60
OIR    2025250     91400   21.9700 -110.1200       4.2        57       137        60
OIR    2025250     91400   21.9700 -110.1300       4.2        57       136        60
OIR    2025250     91400   21.9700 -110.1400       4.2        58       136        60
OIR    2025250     91400   21.9700 -110.1500       4.2        58       135        60
OIR    2025250     91400   21.9700 -110.1600       4.2        58       135        60
OIR    2025250     91400   21.9700 -110.1700       4.2        58       136        60
OIR    2025250     91400   21.9700 -110.1800       4.2        59       138        60
OIR    2025250     91400   21.9700 -110.1900       4.2        59       139        60
OIR    2025250     91400   21.9600 -108.6100       5.7        48       136        60
OIR    2025250     91400   21.9600 -108.6200       5.7        49       137        60
OIR    2025250     91400   21.9600 -108.6300       5.8        49       137        60
OIR    2025250     91400   21.9600 -108.6400       6.0        46       136        60
OIR    2025250     91400   21.9600 -108.6500       6.4        42       135        60
OIR    2025250     91400   21.9600 -108.6600       6.7        40       133        60
OIR    2025250     91400   21.9600 -108.6700       6.8        38       132        60
OIR    2025250     91400   21.9600 -108.6800       6.9        36       131        60
OIR    2025250     91400   21.9600 -108.6900       7.0        35       131        60
OIR    2025250     91400   21.9600 -108.7000       7.2        33       131        60
OIR    2025250     91400   21.9600 -108.7100       7.3        33       131        60
OIR    2025250     91400   21.9600 -108.7200       7.5        32       131        60
OIR    2025250     91400   21.9600 -108.7300       7.6        32       131        60
OIR    2025250     91400   21.9600 -108.7400       7.6        32       131        60
OIR    2025250     91400   21.9600 -108.7500       7.7        32       129        60
OIR    2025250     91400   21.9600 -108.7600       7.7        32       128        60
OIR    2025250     91400   21.9600 -108.7700       7.7        32       127        60
OIR    2025250     91400   21.9600 -108.7800       7.8        32       126        60
OIR    2025250     91400   21.9600 -108.7900       7.9        32       125        60
OIR    2025250     91400   21.9600 -108.8000       7.8        33       125        60
OIR    2025250     91400   21.9600 -108.8100       7.8        34       125        60
OIR    2025250     91400   21.9600 -108.8200       7.6        36       125        60
OIR    2025250     91400   21.9600 -108.8300       7.6        37       124        60
OIR    2025250     91400   21.9600 -108.8400       7.6        37       123        60
OIR    2025250     91400   21.9600 -108.8500       7.5        38       121        60
OIR    2025250     91400   21.9600 -108.8600       7.5        38       119        60
OIR    2025250     91400   21.9600 -108.8700       7.4        38       117        60
OIR    2025250     91400   21.9600 -108.8800       7.4        38       117        60
OIR    2025250     91400   21.9600 -108.8900       7.4        38       119        60
OIR    2025250     91400   21.9600 -108.9000       7.4        39       119        60
OIR    2025250     91400   21.9600 -108.9100       7.3        39       119        60
OIR    2025250     91400   21.9600 -108.9200       7.3        39       119        60
OIR    2025250     91400   21.9600 -108.9300       7.3        39       120        60
OIR    2025250     91400   21.9600 -108.9400       7.3        39       120        60
OIR    2025250     91400   21.9600 -108.9500       7.3        39       121        60
OIR    2025250     91400   21.9600 -108.9600       7.3        39       121        60
OIR    2025250     91400   21.9600 -108.9700       7.3        39       121        60
OIR    2025250     91400   21.9600 -108.9800       7.3        40       119        60
OIR    2025250     91400   21.9600 -108.9900       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.0000       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.0100       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.0200       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.0300       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.0400       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.0500       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.0600       7.3        40       117        60
OIR    2025250     91400   21.9600 -109.0700       7.3        40       117        60
OIR    2025250     91400   21.9600 -109.0800       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.0900       7.3        40       115        60
OIR    2025250     91400   21.9600 -109.1000       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.1100       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.1200       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.1300       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.1400       7.3        40       116        60
OIR    2025250     91400   21.9600 -109.1500       7.3        39       116        60
OIR    2025250     91400   21.9600 -109.1600       7.3        39       116        60
OIR    2025250     91400   21.9600 -109.1700       7.3        39       117        60
OIR    2025250     91400   21.9600 -109.1800       7.3        39       119        60
OIR    2025250     91400   21.9600 -109.1900       7.3        39       120        60
OIR    2025250     91400   21.9600 -109.2000       7.3        39       120        60
OIR    2025250     91400   21.9600 -109.2100       7.3        39       119        60
OIR    2025250     91400   21.9600 -109.2200       7.2        39       119        60
OIR    2025250     91400   21.9600 -109.2300       7.2        39       120        60
OIR    2025250     91400   21.9600 -109.2400       7.2        39       121        60
OIR    2025250     91400   21.9600 -109.2500       7.2        39       121        60
OIR    2025250     91400   21.9600 -109.2600       7.2        39       122        60
OIR    2025250     91400   21.9600 -109.2700       7.2        39       122        60
OIR    2025250     91400   21.9600 -109.2800       7.2        39       121        60
OIR    2025250     91400   21.9600 -109.2900       7.2        39       120        60
OIR    2025250     91400   21.9600 -109.3000       7.2        40       120        60
OIR    2025250     91400   21.9600 -109.3100       7.2        40       121        60
OIR    2025250     91400   21.9600 -109.3200       7.1        40       122        60
OIR    2025250     91400   21.9600 -109.3300       7.1        40       123        60
OIR    2025250     91400   21.9600 -109.3400       7.1        40       124        60
OIR    2025250     91400   21.9600 -109.3500       7.1        40       124        60
OIR    2025250     91400   21.9600 -109.3600       7.1        40       124        60
OIR    2025250     91400   21.9600 -109.3700       7.1        40       125        60
OIR    2025250     91400   21.9600 -109.3800       7.1        40       125        60
OIR    2025250     91400   21.9600 -109.3900       7.1        40       125        60
OIR    2025250     91400   21.9600 -109.4000       7.1        40       125        60
OIR    2025250     91400   21.9600 -109.4100       7.1        40       126        60
OIR    2025250     91400   21.9600 -109.4200       7.1        40       126        60
OIR    2025250     91400   21.9600 -109.4300       7.1        40       127        60
OIR    2025250     91400   21.9600 -109.4400       7.1        40       129        60
OIR    2025250     91400   21.9600 -109.4500       7.1        40       129        60
OIR    2025250     91400   21.9600 -109.4600       7.0        40       129        60
OIR    2025250     91400   21.9600 -109.4700       7.0        40       129        60
OIR    2025250     91400   21.9600 -109.4800       7.0        40       130        60
OIR    2025250     91400   21.9600 -109.4900       7.0        40       131        60
OIR    2025250     91400   21.9600 -109.5000       7.0        40       130        60
OIR    2025250     91400   21.9600 -109.5100       7.0        40       129        60
OIR    2025250     91400   21.9600 -109.5200       7.0        40       127        60
OIR    2025250     91400   21.9600 -109.5300       7.0        40       124        60
OIR    2025250     91400   21.9600 -109.5400       6.9        40       121        60
OIR    2025250     91400   21.9600 -109.5500       6.9        40       121        60
OIR    2025250     91400   21.9600 -109.5600       6.9        40       121        60
OIR    2025250     91400   21.9600 -109.5700       6.8        40       121        60
OIR    2025250     91400   21.9600 -109.5800       6.7        40       120        60
OIR    2025250     91400   21.9600 -109.5900       6.5        40       119        60
OIR    2025250     91400   21.9600 -109.6000       6.1        40       120        60
OIR    2025250     91400   21.9600 -109.6100       5.5        41       121        60
OIR    2025250     91400   21.9600 -109.6200       4.9        42       122        60
OIR    2025250     91400   21.9600 -109.6300       4.4        44       121        60
OIR    2025250     91400   21.9600 -109.6400       4.2        45       120        60
OIR    2025250     91400   21.9600 -109.6500       4.0        46       120        60
OIR    2025250     91400   21.9600 -110.0000       4.0        53       133        60
OIR    2025250     91400   21.9600 -110.0100       4.0        53       134        60
OIR    2025250     91400   21.9600 -110.0200       4.0        53       134        60
OIR    2025250     91400   21.9600 -110.0300       4.1        54       134        60
OIR    2025250     91400   21.9600 -110.0400       4.1        55       135        60
OIR    2025250     91400   21.9600 -110.0500       4.2        55       138        60
OIR    2025250     91400   21.9600 -110.1000       4.2        57       139        60
OIR    2025250     91400   21.9600 -110.1100       4.2        57       139        60
OIR    2025250     91400   21.9600 -110.1200       4.2        57       139        60
OIR    2025250     91400   21.9600 -110.1300       4.2        58       138        60
OIR    2025250     91400   21.9600 -110.1400       4.2        58       138        60
OIR    2025250     91400   21.9600 -110.1500       4.2        58       138        60
OIR    2025250     91400   21.9600 -110.1600       4.2        58       139        60
OIR    2025250     91400   21.9600 -110.1700       4.2        58       139        60
OIR    2025250     91400   21.9600 -110.1800       4.2        59       139        60
OIR    2025250     91400   21.9500 -108.6100       6.5        44       128        60
OIR    2025250     91400   21.9500 -108.6200       6.4        45       130        60
OIR    2025250     91400   21.9500 -108.6300       6.1        47       129        60
OIR    2025250     91400   21.9500 -108.6400       6.3        45       129        60
OIR    2025250     91400   21.9500 -108.6500       6.6        43       129        60
OIR    2025250     91400   21.9500 -108.6600       7.0        40       129        60
OIR    2025250     91400   21.9500 -108.6700       7.1        39       129        60
OIR    2025250     91400   21.9500 -108.6800       7.2        38       128        60
OIR    2025250     91400   21.9500 -108.6900       7.2        37       128        60
OIR    2025250     91400   21.9500 -108.7000       7.3        35       129        60
OIR    2025250     91400   21.9500 -108.7100       7.4        34       129        60
OIR    2025250     91400   21.9500 -108.7200       7.5        33       130        60
OIR    2025250     91400   21.9500 -108.7300       7.6        33       129        60
OIR    2025250     91400   21.9500 -108.7400       7.7        32       129        60
OIR    2025250     91400   21.9500 -108.7500       7.7        32       128        60
OIR    2025250     91400   21.9500 -108.7600       7.7        32       127        60
OIR    2025250     91400   21.9500 -108.7700       7.7        33       126        60
OIR    2025250     91400   21.9500 -108.7800       7.8        33       125        60
OIR    2025250     91400   21.9500 -108.7900       7.8        34       125        60
OIR    2025250     91400   21.9500 -108.8000       7.7        36       124        60
OIR    2025250     91400   21.9500 -108.8100       7.6        37       124        60
OIR    2025250     91400   21.9500 -108.8200       7.6        37       124        60
OIR    2025250     91400   21.9500 -108.8300       7.6        38       123        60
OIR    2025250     91400   21.9500 -108.8400       7.6        38       122        60
OIR    2025250     91400   21.9500 -108.8500       7.5        38       121        60
OIR    2025250     91400   21.9500 -108.8600       7.5        38       120        60
OIR    2025250     91400   21.9500 -108.8700       7.5        38       119        60
OIR    2025250     91400   21.9500 -108.8800       7.4        38       119        60
OIR    2025250     91400   21.9500 -108.8900       7.4        39       120        60
OIR    2025250     91400   21.9500 -108.9000       7.4        39       120        60
OIR    2025250     91400   21.9500 -108.9100       7.4        39       119        60
OIR    2025250     91400   21.9500 -108.9200       7.4        39       119        60
OIR    2025250     91400   21.9500 -108.9300       7.4        39       119        60
OIR    2025250     91400   21.9500 -108.9400       7.4        39       119        60
OIR    2025250     91400   21.9500 -108.9500       7.4        39       120        60
OIR    2025250     91400   21.9500 -108.9600       7.4        39       120        60
OIR    2025250     91400   21.9500 -108.9700       7.3        39       120        60
OIR    2025250     91400   21.9500 -108.9800       7.3        40       117        60
OIR    2025250     91400   21.9500 -108.9900       7.3        40       115        60
OIR    2025250     91400   21.9500 -109.0000       7.3        40       114        60
OIR    2025250     91400   21.9500 -109.0100       7.3        40       114        60
OIR    2025250     91400   21.9500 -109.0200       7.3        40       114        60
OIR    2025250     91400   21.9500 -109.0300       7.3        40       115        60
OIR    2025250     91400   21.9500 -109.0400       7.3        40       117        60
OIR    2025250     91400   21.9500 -109.0500       7.3        40       117        60
OIR    2025250     91400   21.9500 -109.0600       7.3        40       117        60
OIR    2025250     91400   21.9500 -109.0700       7.3        40       117        60
OIR    2025250     91400   21.9500 -109.0800       7.3        40       116        60
OIR    2025250     91400   21.9500 -109.0900       7.3        40       114        60
OIR    2025250     91400   21.9500 -109.1000       7.3        40       112        60
OIR    2025250     91400   21.9500 -109.1100       7.3        40       112        60
OIR    2025250     91400   21.9500 -109.1200       7.3        40       113        60
OIR    2025250     91400   21.9500 -109.1300       7.3        40       114        60
OIR    2025250     91400   21.9500 -109.1400       7.3        40       114        60
OIR    2025250     91400   21.9500 -109.1500       7.3        40       115        60
OIR    2025250     91400   21.9500 -109.1600       7.3        40       116        60
OIR    2025250     91400   21.9500 -109.1700       7.3        40       116        60
OIR    2025250     91400   21.9500 -109.1800       7.3        40       117        60
OIR    2025250     91400   21.9500 -109.1900       7.3        40       119        60
OIR    2025250     91400   21.9500 -109.2000       7.3        40       119        60
OIR    2025250     91400   21.9500 -109.2100       7.3        40       119        60
OIR    2025250     91400   21.9500 -109.2200       7.3        40       117        60
OIR    2025250     91400   21.9500 -109.2300       7.2        40       119        60
OIR    2025250     91400   21.9500 -109.2400       7.2        40       120        60
OIR    2025250     91400   21.9500 -109.2500       7.2        40       121        60
OIR    2025250     91400   21.9500 -109.2600       7.2        40       120        60
OIR    2025250     91400   21.9500 -109.2700       7.2        40       120        60
OIR    2025250     91400   21.9500 -109.2800       7.2        40       119        60
OIR    2025250     91400   21.9500 -109.2900       7.2        40       119        60
OIR    2025250     91400   21.9500 -109.3000       7.2        40       119        60
OIR    2025250     91400   21.9500 -109.3100       7.2        40       120        60
OIR    2025250     91400   21.9500 -109.3200       7.2        40       121        60
OIR    2025250     91400   21.9500 -109.3300       7.1        40       122        60
OIR    2025250     91400   21.9500 -109.3400       7.1        40       123        60
OIR    2025250     91400   21.9500 -109.3500       7.1        40       123        60
OIR    2025250     91400   21.9500 -109.3600       7.1        40       123        60
OIR    2025250     91400   21.9500 -109.3700       7.1        40       123        60
OIR    2025250     91400   21.9500 -109.3800       7.1        40       123        60
OIR    2025250     91400   21.9500 -109.3900       7.1        40       124        60
OIR    2025250     91400   21.9500 -109.4000       7.1        40       124        60
OIR    2025250     91400   21.9500 -109.4100       7.1        40       125        60
OIR    2025250     91400   21.9500 -109.4200       7.1        40       125        60
OIR    2025250     91400   21.9500 -109.4300       7.1        40       126        60
OIR    2025250     91400   21.9500 -109.4400       7.1        40       127        60
OIR    2025250     91400   21.9500 -109.4500       7.1        40       128        60
OIR    2025250     91400   21.9500 -109.4600       7.1        40       127        60
OIR    2025250     91400   21.9500 -109.4700       7.0        40       127        60
OIR    2025250     91400   21.9500 -109.4800       7.0        40       128        60
OIR    2025250     91400   21.9500 -109.4900       7.0        40       129        60
OIR    2025250     91400   21.9500 -109.5000       7.0        40       130        60
OIR    2025250     91400   21.9500 -109.5100       7.0        40       129        60
OIR    2025250     91400   21.9500 -109.5200       7.0        40       128        60
OIR    2025250     91400   21.9500 -109.5300       7.0        40       126        60
OIR    2025250     91400   21.9500 -109.5400       6.9        40       123        60
OIR    2025250     91400   21.9500 -109.5500       6.9        40       123        60
OIR    2025250     91400   21.9500 -109.5600       6.9        40       123        60
OIR    2025250     91400   21.9500 -109.5700       6.8        40       123        60
OIR    2025250     91400   21.9500 -109.5800       6.7        40       123        60
OIR    2025250     91400   21.9500 -109.5900       6.6        40       122        60
OIR    2025250     91400   21.9500 -109.6000       6.3        40       122        60
OIR    2025250     91400   21.9500 -109.6100       5.8        41       122        60
OIR    2025250     91400   21.9500 -109.6200       5.1        42       123        60
OIR    2025250     91400   21.9500 -109.6300       4.5        43       122        60
OIR    2025250     91400   21.9500 -109.6400       4.2        45       120        60
OIR    2025250     91400   21.9500 -109.6500       4.0        46       120        60
OIR    2025250     91400   21.9500 -110.0100       4.0        53       135        60
OIR    2025250     91400   21.9500 -110.0200       4.0        53       135        60
OIR    2025250     91400   21.9500 -110.0300       4.1        54       135        60
OIR    2025250     91400   21.9500 -110.0400       4.1        55       135        60
OIR    2025250     91400   21.9500 -110.0500       4.1        56       137        60
OIR    2025250     91400   21.9500 -110.0600       4.2        56       139        60
OIR    2025250     91400   21.9400 -108.6100       7.5        40       124        60
OIR    2025250     91400   21.9400 -108.6200       7.4        40       126        60
OIR    2025250     91400   21.9400 -108.6300       7.2        41       126        60
OIR    2025250     91400   21.9400 -108.6400       7.1        41       125        60
OIR    2025250     91400   21.9400 -108.6500       7.2        41       124        60
OIR    2025250     91400   21.9400 -108.6600       7.2        40       125        60
OIR    2025250     91400   21.9400 -108.6700       7.3        40       126        60
OIR    2025250     91400   21.9400 -108.6800       7.3        39       126        60
OIR    2025250     91400   21.9400 -108.6900       7.4        38       126        60
OIR    2025250     91400   21.9400 -108.7000       7.4        37       126        60
OIR    2025250     91400   21.9400 -108.7100       7.5        36       127        60
OIR    2025250     91400   21.9400 -108.7200       7.6        35       128        60
OIR    2025250     91400   21.9400 -108.7300       7.6        34       127        60
OIR    2025250     91400   21.9400 -108.7400       7.7        33       127        60
OIR    2025250     91400   21.9400 -108.7500       7.7        33       126        60
OIR    2025250     91400   21.9400 -108.7600       7.7        34       125        60
OIR    2025250     91400   21.9400 -108.7700       7.7        35       124        60
OIR    2025250     91400   21.9400 -108.7800       7.7        36       123        60
OIR    2025250     91400   21.9400 -108.7900       7.7        36       124        60
OIR    2025250     91400   21.9400 -108.8000       7.6        37       123        60
OIR    2025250     91400   21.9400 -108.8100       7.6        38       123        60
OIR    2025250     91400   21.9400 -108.8200       7.6        38       122        60
OIR    2025250     91400   21.9400 -108.8300       7.6        38       121        60
OIR    2025250     91400   21.9400 -108.8400       7.6        38       121        60
OIR    2025250     91400   21.9400 -108.8500       7.5        38       120        60
OIR    2025250     91400   21.9400 -108.8600       7.5        38       121        60
OIR    2025250     91400   21.9400 -108.8700       7.5        39       120        60
OIR    2025250     91400   21.9400 -108.8800       7.5        39       120        60
OIR    2025250     91400   21.9400 -108.8900       7.4        39       121        60
OIR    2025250     91400   21.9400 -108.9000       7.4        39       121        60
OIR    2025250     91400   21.9400 -108.9100       7.4        39       120        60
OIR    2025250     91400   21.9400 -108.9200       7.4        39       120        60
OIR    2025250     91400   21.9400 -108.9300       7.4        39       120        60
OIR    2025250     91400   21.9400 -108.9400       7.4        39       119        60
OIR    2025250     91400   21.9400 -108.9500       7.4        39       119        60
OIR    2025250     91400   21.9400 -108.9600       7.4        39       119        60
OIR    2025250     91400   21.9400 -108.9700       7.4        40       117        60
OIR    2025250     91400   21.9400 -108.9800       7.4        40       116        60
OIR    2025250     91400   21.9400 -108.9900       7.4        40       116        60
OIR    2025250     91400   21.9400 -109.0000       7.3        40       115        60
OIR    2025250     91400   21.9400 -109.0100       7.3        40       114        60
OIR    2025250     91400   21.9400 -109.0200       7.3        40       114        60
OIR    2025250     91400   21.9400 -109.0300       7.3        40       114        60
OIR    2025250     91400   21.9400 -109.0400       7.3        40       114        60
OIR    2025250     91400   21.9400 -109.0500       7.3        40       115        60
OIR    2025250     91400   21.9400 -109.0600       7.3        40       115        60
OIR    2025250     91400   21.9400 -109.0700       7.3        40       116        60
OIR    2025250     91400   21.9400 -109.0800       7.3        40       115        60
OIR    2025250     91400   21.9400 -109.0900       7.3        40       114        60
OIR    2025250     91400   21.9400 -109.1000       7.3        40       113        60
OIR    2025250     91400   21.9400 -109.1100       7.3        40       114        60
OIR    2025250     91400   21.9400 -109.1200       7.3        40       114        60
OIR    2025250     91400   21.9400 -109.1300       7.3        40       115        60
OIR    2025250     91400   21.9400 -109.1400       7.3        40       115        60
OIR    2025250     91400   21.9400 -109.1500       7.3        40       115        60
OIR    2025250     91400   21.9400 -109.1600       7.3        40       116        60
OIR    2025250     91400   21.9400 -109.1700       7.3        40       116        60
OIR    2025250     91400   21.9400 -109.1800       7.3        40       117        60
OIR    2025250     91400   21.9400 -109.1900       7.3        40       117        60
OIR    2025250     91400   21.9400 -109.2000       7.3        40       117        60
OIR    2025250     91400   21.9400 -109.2100       7.3        40       117        60
OIR    2025250     91400   21.9400 -109.2200       7.3        40       116        60
OIR    2025250     91400   21.9400 -109.2300       7.3        40       116        60
OIR    2025250     91400   21.9400 -109.2400       7.2        40       117        60
OIR    2025250     91400   21.9400 -109.2500       7.2        40       119        60
OIR    2025250     91400   21.9400 -109.2600       7.2        40       119        60
OIR    2025250     91400   21.9400 -109.2700       7.2        40       117        60
OIR    2025250     91400   21.9400 -109.2800       7.2        40       117        60
OIR    2025250     91400   21.9400 -109.2900       7.2        40       117        60
OIR    2025250     91400   21.9400 -109.3000       7.2        40       117        60
OIR    2025250     91400   21.9400 -109.3100       7.2        40       119        60
OIR    2025250     91400   21.9400 -109.3200       7.2        40       119        60
OIR    2025250     91400   21.9400 -109.3300       7.2        40       120        60
OIR    2025250     91400   21.9400 -109.3400       7.1        40       122        60
OIR    2025250     91400   21.9400 -109.3500       7.1        40       123        60
OIR    2025250     91400   21.9400 -109.3600       7.1        40       122        60
OIR    2025250     91400   21.9400 -109.3700       7.1        40       121        60
OIR    2025250     91400   21.9400 -109.3800       7.1        40       122        60
OIR    2025250     91400   21.9400 -109.3900       7.1        40       122        60
OIR    2025250     91400   21.9400 -109.4000       7.1        40       123        60
OIR    2025250     91400   21.9400 -109.4100       7.1        40       124        60
OIR    2025250     91400   21.9400 -109.4200       7.1        40       124        60
OIR    2025250     91400   21.9400 -109.4300       7.1        40       125        60
OIR    2025250     91400   21.9400 -109.4400       7.1        40       126        60
OIR    2025250     91400   21.9400 -109.4500       7.1        40       127        60
OIR    2025250     91400   21.9400 -109.4600       7.1        40       126        60
OIR    2025250     91400   21.9400 -109.4700       7.0        40       125        60
OIR    2025250     91400   21.9400 -109.4800       7.0        40       126        60
OIR    2025250     91400   21.9400 -109.4900       7.0        40       127        60
OIR    2025250     91400   21.9400 -109.5000       7.0        40       128        60
OIR    2025250     91400   21.9400 -109.5100       7.0        40       128        60
OIR    2025250     91400   21.9400 -109.5200       7.0        40       128        60
OIR    2025250     91400   21.9400 -109.5300       7.0        40       127        60
OIR    2025250     91400   21.9400 -109.5400       6.9        40       125        60
OIR    2025250     91400   21.9400 -109.5500       6.9        40       124        60
OIR    2025250     91400   21.9400 -109.5600       6.9        40       123        60
OIR    2025250     91400   21.9400 -109.5700       6.8        40       123        60
OIR    2025250     91400   21.9400 -109.5800       6.7        40       122        60
OIR    2025250     91400   21.9400 -109.5900       6.6        40       122        60
OIR    2025250     91400   21.9400 -109.6000       6.4        40       121        60
OIR    2025250     91400   21.9400 -109.6100       6.0        40       120        60
OIR    2025250     91400   21.9400 -109.6200       5.4        41       120        60
OIR    2025250     91400   21.9400 -109.6300       4.6        43       119        60
OIR    2025250     91400   21.9400 -109.6400       4.2        45       117        60
OIR    2025250     91400   21.9400 -109.6500       4.0        46       116        60
OIR    2025250     91400   21.9400 -110.0100       4.0        53       137        60
OIR    2025250     91400   21.9400 -110.0200       4.0        53       137        60
OIR    2025250     91400   21.9400 -110.0300       4.0        54       137        60
OIR    2025250     91400   21.9400 -110.0400       4.1        55       137        60
OIR    2025250     91400   21.9400 -110.0500       4.1        56       138        60
OIR    2025250     91400   21.9400 -110.0600       4.2        56       138        60
OIR    2025250     91400   21.9400 -110.0700       4.2        56       139        60
OIR    2025250     91400   21.9300 -108.6100       7.5        40       121        60
OIR    2025250     91400   21.9300 -108.6200       7.5        40       123        60
OIR    2025250     91400   21.9300 -108.6300       7.5        40       123        60
OIR    2025250     91400   21.9300 -108.6400       7.4        41       122        60
OIR    2025250     91400   21.9300 -108.6500       7.4        41       120        60
OIR    2025250     91400   21.9300 -108.6600       7.4        40       121        60
OIR    2025250     91400   21.9300 -108.6700       7.5        40       123        60
OIR    2025250     91400   21.9300 -108.6800       7.5        39       123        60
OIR    2025250     91400   21.9300 -108.6900       7.5        39       124        60
OIR    2025250     91400   21.9300 -108.7000       7.6        38       124        60
OIR    2025250     91400   21.9300 -108.7100       7.6        37       125        60
OIR    2025250     91400   21.9300 -108.7200       7.6        37       125        60
OIR    2025250     91400   21.9300 -108.7300       7.6        36       125        60
OIR    2025250     91400   21.9300 -108.7400       7.6        36       125        60
OIR    2025250     91400   21.9300 -108.7500       7.6        37       124        60
OIR    2025250     91400   21.9300 -108.7600       7.6        38       122        60
OIR    2025250     91400   21.9300 -108.7700       7.6        38       120        60
OIR    2025250     91400   21.9300 -108.7800       7.7        38       119        60
OIR    2025250     91400   21.9300 -108.7900       7.6        38       119        60
OIR    2025250     91400   21.9300 -108.8000       7.6        38       119        60
OIR    2025250     91400   21.9300 -108.8100       7.6        38       119        60
OIR    2025250     91400   21.9300 -108.8200       7.6        38       117        60
OIR    2025250     91400   21.9300 -108.8300       7.6        38       117        60
OIR    2025250     91400   21.9300 -108.8400       7.6        38       119        60
OIR    2025250     91400   21.9300 -108.8500       7.5        38       120        60
OIR    2025250     91400   21.9300 -108.8600       7.5        39       119        60
OIR    2025250     91400   21.9300 -108.8700       7.5        39       119        60
OIR    2025250     91400   21.9300 -108.8800       7.5        39       119        60
OIR    2025250     91400   21.9300 -108.8900       7.5        39       120        60
OIR    2025250     91400   21.9300 -108.9000       7.4        39       120        60
OIR    2025250     91400   21.9300 -108.9100       7.4        39       120        60
OIR    2025250     91400   21.9300 -108.9200       7.4        39       120        60
OIR    2025250     91400   21.9300 -108.9300       7.4        39       120        60
OIR    2025250     91400   21.9300 -108.9400       7.4        39       119        60
OIR    2025250     91400   21.9300 -108.9500       7.4        39       117        60
OIR    2025250     91400   21.9300 -108.9600       7.4        40       117        60
OIR    2025250     91400   21.9300 -108.9700       7.4        40       116        60
OIR    2025250     91400   21.9300 -108.9800       7.4        40       116        60
OIR    2025250     91400   21.9300 -108.9900       7.4        40       115        60
OIR    2025250     91400   21.9300 -109.0000       7.4        40       114        60
OIR    2025250     91400   21.9300 -109.0100       7.4        40       114        60
OIR    2025250     91400   21.9300 -109.0200       7.4        40       115        60
OIR    2025250     91400   21.9300 -109.0300       7.3        40       114        60
OIR    2025250     91400   21.9300 -109.0400       7.3        40       113        60
OIR    2025250     91400   21.9300 -109.0500       7.3        40       111        60
OIR    2025250     91400   21.9300 -109.0600       7.3        40       112        60
OIR    2025250     91400   21.9300 -109.0700       7.3        40       113        60
OIR    2025250     91400   21.9300 -109.0800       7.3        40       114        60
OIR    2025250     91400   21.9300 -109.0900       7.3        40       114        60
OIR    2025250     91400   21.9300 -109.1000       7.3        40       114        60
OIR    2025250     91400   21.9300 -109.1100       7.3        40       115        60
OIR    2025250     91400   21.9300 -109.1200       7.3        40       116        60
OIR    2025250     91400   21.9300 -109.1300       7.3        40       116        60
OIR    2025250     91400   21.9300 -109.1400       7.3        40       116        60
OIR    2025250     91400   21.9300 -109.1500       7.3        40       115        60
OIR    2025250     91400   21.9300 -109.1600       7.3        40       116        60
OIR    2025250     91400   21.9300 -109.1700       7.3        40       117        60
OIR    2025250     91400   21.9300 -109.1800       7.3        40       117        60
OIR    2025250     91400   21.9300 -109.1900       7.3        40       117        60
OIR    2025250     91400   21.9300 -109.2000       7.3        40       117        60
OIR    2025250     91400   21.9300 -109.2100       7.3        40       116        60
OIR    2025250     91400   21.9300 -109.2200       7.3        40       115        60
OIR    2025250     91400   21.9300 -109.2300       7.3        40       115        60
OIR    2025250     91400   21.9300 -109.2400       7.3        40       116        60
OIR    2025250     91400   21.9300 -109.2500       7.2        40       116        60
OIR    2025250     91400   21.9300 -109.2600       7.2        40       116        60
OIR    2025250     91400   21.9300 -109.2700       7.2        40       117        60
OIR    2025250     91400   21.9300 -109.2800       7.2        40       119        60
OIR    2025250     91400   21.9300 -109.2900       7.2        40       119        60
OIR    2025250     91400   21.9300 -109.3000       7.2        40       119        60
OIR    2025250     91400   21.9300 -109.3100       7.2        40       119        60
OIR    2025250     91400   21.9300 -109.3200       7.2        40       117        60
OIR    2025250     91400   21.9300 -109.3300       7.2        40       117        60
OIR    2025250     91400   21.9300 -109.3400       7.2        40       120        60
OIR    2025250     91400   21.9300 -109.3500       7.2        40       122        60
OIR    2025250     91400   21.9300 -109.3600       7.1        40       122        60
OIR    2025250     91400   21.9300 -109.3700       7.1        40       122        60
OIR    2025250     91400   21.9300 -109.3800       7.1        40       122        60
OIR    2025250     91400   21.9300 -109.3900       7.1        40       122        60
OIR    2025250     91400   21.9300 -109.4000       7.1        40       122        60
OIR    2025250     91400   21.9300 -109.4100       7.1        40       122        60
OIR    2025250     91400   21.9300 -109.4200       7.1        40       123        60
OIR    2025250     91400   21.9300 -109.4300       7.1        40       124        60
OIR    2025250     91400   21.9300 -109.4400       7.1        40       124        60
OIR    2025250     91400   21.9300 -109.4500       7.1        40       125        60
OIR    2025250     91400   21.9300 -109.4600       7.1        40       125        60
OIR    2025250     91400   21.9300 -109.4700       7.0        40       125        60
OIR    2025250     91400   21.9300 -109.4800       7.0        40       125        60
OIR    2025250     91400   21.9300 -109.4900       7.0        40       125        60
OIR    2025250     91400   21.9300 -109.5000       7.0        40       126        60
OIR    2025250     91400   21.9300 -109.5100       7.0        40       126        60
OIR    2025250     91400   21.9300 -109.5200       7.0        40       127        60
OIR    2025250     91400   21.9300 -109.5300       7.0        40       127        60
OIR    2025250     91400   21.9300 -109.5400       6.9        40       126        60
OIR    2025250     91400   21.9300 -109.5500       6.9        40       125        60
OIR    2025250     91400   21.9300 -109.5600       6.9        40       124        60
OIR    2025250     91400   21.9300 -109.5700       6.8        40       123        60
OIR    2025250     91400   21.9300 -109.5800       6.7        40       122        60
OIR    2025250     91400   21.9300 -109.5900       6.6        40       122        60
OIR    2025250     91400   21.9300 -109.6000       6.5        40       122        60
OIR    2025250     91400   21.9300 -109.6100       6.2        40       119        60
OIR    2025250     91400   21.9300 -109.6200       5.6        41       116        60
OIR    2025250     91400   21.9300 -109.6300       4.8        43       116        60
OIR    2025250     91400   21.9300 -109.6400       4.2        45       115        60
OIR    2025250     91400   21.9300 -109.6500       4.0        46       115        60
OIR    2025250     91400   21.9300 -110.0200       4.0        53       139        60
OIR    2025250     91400   21.9300 -110.0300       4.0        54       139        60
OIR    2025250     91400   21.9300 -110.0400       4.1        55       139        60
OIR    2025250     91400   21.9300 -110.0500       4.1        56       139        60
OIR    2025250     91400   21.9300 -110.0600       4.2        56       139        60
OIR    2025250     91400   21.9300 -110.0700       4.2        56       139        60
OIR    2025250     91400   21.9200 -108.6100       7.5        40       119        60
OIR    2025250     91400   21.9200 -108.6200       7.5        40       121        60
OIR    2025250     91400   21.9200 -108.6300       7.6        40       122        60
OIR    2025250     91400   21.9200 -108.6400       7.6        40       120        60
OIR    2025250     91400   21.9200 -108.6500       7.6        40       119        60
OIR    2025250     91400   21.9200 -108.6600       7.5        40       119        60
OIR    2025250     91400   21.9200 -108.6700       7.6        40       119        60
OIR    2025250     91400   21.9200 -108.6800       7.6        39       120        60
OIR    2025250     91400   21.9200 -108.6900       7.6        39       121        60
OIR    2025250     91400   21.9200 -108.7000       7.6        39       121        60
OIR    2025250     91400   21.9200 -108.7100       7.6        38       122        60
OIR    2025250     91400   21.9200 -108.7200       7.6        38       123        60
OIR    2025250     91400   21.9200 -108.7300       7.6        38       123        60
OIR    2025250     91400   21.9200 -108.7400       7.6        38       122        60
OIR    2025250     91400   21.9200 -108.7500       7.6        38       122        60
OIR    2025250     91400   21.9200 -108.7600       7.6        38       120        60
OIR    2025250     91400   21.9200 -108.7700       7.6        38       117        60
OIR    2025250     91400   21.9200 -108.7800       7.6        38       115        60
OIR    2025250     91400   21.9200 -108.7900       7.6        38       115        60
OIR    2025250     91400   21.9200 -108.8000       7.6        38       116        60
OIR    2025250     91400   21.9200 -108.8100       7.6        38       115        60
OIR    2025250     91400   21.9200 -108.8200       7.6        38       114        60
OIR    2025250     91400   21.9200 -108.8300       7.6        39       114        60
OIR    2025250     91400   21.9200 -108.8400       7.6        39       116        60
OIR    2025250     91400   21.9200 -108.8500       7.5        39       119        60
OIR    2025250     91400   21.9200 -108.8600       7.5        39       119        60
OIR    2025250     91400   21.9200 -108.8700       7.5        39       116        60
OIR    2025250     91400   21.9200 -108.8800       7.5        39       116        60
OIR    2025250     91400   21.9200 -108.8900       7.5        39       117        60
OIR    2025250     91400   21.9200 -108.9000       7.5        39       119        60
OIR    2025250     91400   21.9200 -108.9100       7.4        39       119        60
OIR    2025250     91400   21.9200 -108.9200       7.4        39       119        60
OIR    2025250     91400   21.9200 -108.9300       7.4        39       119        60
OIR    2025250     91400   21.9200 -108.9400       7.4        39       117        60
OIR    2025250     91400   21.9200 -108.9500       7.4        39       117        60
OIR    2025250     91400   21.9200 -108.9600       7.4        40       116        60
OIR    2025250     91400   21.9200 -108.9700       7.4        40       115        60
OIR    2025250     91400   21.9200 -108.9800       7.4        40       113        60
OIR    2025250     91400   21.9200 -108.9900       7.4        40       113        60
OIR    2025250     91400   21.9200 -109.0000       7.4        40       113        60
OIR    2025250     91400   21.9200 -109.0100       7.4        40       113        60
OIR    2025250     91400   21.9200 -109.0200       7.4        40       114        60
OIR    2025250     91400   21.9200 -109.0300       7.4        40       115        60
OIR    2025250     91400   21.9200 -109.0400       7.4        40       113        60
OIR    2025250     91400   21.9200 -109.0500       7.4        40       111        60
OIR    2025250     91400   21.9200 -109.0600       7.4        40       110        60
OIR    2025250     91400   21.9200 -109.0700       7.4        40       111        60
OIR    2025250     91400   21.9200 -109.0800       7.4        40       112        60
OIR    2025250     91400   21.9200 -109.0900       7.4        40       112        60
OIR    2025250     91400   21.9200 -109.1000       7.3        40       113        60
OIR    2025250     91400   21.9200 -109.1100       7.3        40       113        60
OIR    2025250     91400   21.9200 -109.1200       7.3        40       114        60
OIR    2025250     91400   21.9200 -109.1300       7.3        40       115        60
OIR    2025250     91400   21.9200 -109.1400       7.3        40       115        60
OIR    2025250     91400   21.9200 -109.1500       7.3        40       114        60
OIR    2025250     91400   21.9200 -109.1600       7.3        40       115        60
OIR    2025250     91400   21.9200 -109.1700       7.3        40       116        60
OIR    2025250     91400   21.9200 -109.1800       7.3        40       116        60
OIR    2025250     91400   21.9200 -109.1900       7.3        40       116        60
OIR    2025250     91400   21.9200 -109.2000       7.3        40       116        60
OIR    2025250     91400   21.9200 -109.2100       7.3        40       116        60
OIR    2025250     91400   21.9200 -109.2200       7.3        40       115        60
OIR    2025250     91400   21.9200 -109.2300       7.3        40       114        60
OIR    2025250     91400   21.9200 -109.2400       7.3        40       114        60
OIR    2025250     91400   21.9200 -109.2500       7.2        40       115        60
OIR    2025250     91400   21.9200 -109.2600       7.2        40       116        60
OIR    2025250     91400   21.9200 -109.2700       7.2        40       116        60
OIR    2025250     91400   21.9200 -109.2800       7.2        40       117        60
OIR    2025250     91400   21.9200 -109.2900       7.2        40       119        60
OIR    2025250     91400   21.9200 -109.3000       7.2        40       120        60
OIR    2025250     91400   21.9200 -109.3100       7.2        40       119        60
OIR    2025250     91400   21.9200 -109.3200       7.2        40       116        60
OIR    2025250     91400   21.9200 -109.3300       7.2        40       116        60
OIR    2025250     91400   21.9200 -109.3400       7.2        40       117        60
OIR    2025250     91400   21.9200 -109.3500       7.2        40       120        60
OIR    2025250     91400   21.9200 -109.3600       7.1        40       122        60
OIR    2025250     91400   21.9200 -109.3700       7.1        40       123        60
OIR    2025250     91400   21.9200 -109.3800       7.1        40       123        60
OIR    2025250     91400   21.9200 -109.3900       7.1        40       122        60
OIR    2025250     91400   21.9200 -109.4000       7.1        40       121        60
OIR    2025250     91400   21.9200 -109.4100       7.1        40       121        60
OIR    2025250     91400   21.9200 -109.4200       7.1        40       122        60
OIR    2025250     91400   21.9200 -109.4300       7.1        40       122        60
OIR    2025250     91400   21.9200 -109.4400       7.1        40       123        60
OIR    2025250     91400   21.9200 -109.4500       7.1        40       123        60
OIR    2025250     91400   21.9200 -109.4600       7.1        40       124        60
OIR    2025250     91400   21.9200 -109.4700       7.0        40       125        60
OIR    2025250     91400   21.9200 -109.4800       7.0        40       126        60
OIR    2025250     91400   21.9200 -109.4900       7.0        40       125        60
OIR    2025250     91400   21.9200 -109.5000       7.0        40       125        60
OIR    2025250     91400   21.9200 -109.5100       7.0        40       125        60
OIR    2025250     91400   21.9200 -109.5200       7.0        40       126        60
OIR    2025250     91400   21.9200 -109.5300       7.0        40       127        60
OIR    2025250     91400   21.9200 -109.5400       6.9        40       127        60
OIR    2025250     91400   21.9200 -109.5500       6.9        40       127        60
OIR    2025250     91400   21.9200 -109.5600       6.9        40       125        60
OIR    2025250     91400   21.9200 -109.5700       6.8        40       123        60
OIR    2025250     91400   21.9200 -109.5800       6.7        40       122        60
OIR    2025250     91400   21.9200 -109.5900       6.7        40       122        60
OIR    2025250     91400   21.9200 -109.6000       6.5        40       122        60
OIR    2025250     91400   21.9200 -109.6100       6.3        40       120        60
OIR    2025250     91400   21.9200 -109.6200       5.9        40       117        60
OIR    2025250     91400   21.9200 -109.6300       5.1        42       116        60
OIR    2025250     91400   21.9200 -109.6400       4.3        45       116        60
OIR    2025250     91400   21.9200 -109.6500       4.0        46       116        60
OIR    2025250     91400   21.9200 -110.0300       4.0        54       140        60
OIR    2025250     91400   21.9200 -110.0400       4.1        55       139        60
OIR    2025250     91400   21.9200 -110.0500       4.1        56       139        60
OIR    2025250     91400   21.9200 -110.0600       4.1        56       139        60
OIR    2025250     91400   21.9100 -108.6100       7.6        40       116        60
OIR    2025250     91400   21.9100 -108.6200       7.6        40       119        60
OIR    2025250     91400   21.9100 -108.6300       7.6        40       120        60
OIR    2025250     91400   21.9100 -108.6400       7.6        40       119        60
OIR    2025250     91400   21.9100 -108.6500       7.6        40       117        60
OIR    2025250     91400   21.9100 -108.6600       7.6        40       116        60
OIR    2025250     91400   21.9100 -108.6700       7.6        40       116        60
OIR    2025250     91400   21.9100 -108.6800       7.6        39       116        60
OIR    2025250     91400   21.9100 -108.6900       7.6        39       116        60
OIR    2025250     91400   21.9100 -108.7000       7.6        39       117        60
OIR    2025250     91400   21.9100 -108.7100       7.6        39       119        60
OIR    2025250     91400   21.9100 -108.7200       7.6        39       120        60
OIR    2025250     91400   21.9100 -108.7300       7.6        39       121        60
OIR    2025250     91400   21.9100 -108.7400       7.6        39       120        60
OIR    2025250     91400   21.9100 -108.7500       7.6        39       120        60
OIR    2025250     91400   21.9100 -108.7600       7.6        38       119        60
OIR    2025250     91400   21.9100 -108.7700       7.6        39       116        60
OIR    2025250     91400   21.9100 -108.7800       7.6        39       116        60
OIR    2025250     91400   21.9100 -108.7900       7.6        39       116        60
OIR    2025250     91400   21.9100 -108.8000       7.6        39       115        60
OIR    2025250     91400   21.9100 -108.8100       7.6        39       115        60
OIR    2025250     91400   21.9100 -108.8200       7.6        39       115        60
OIR    2025250     91400   21.9100 -108.8300       7.6        39       115        60
OIR    2025250     91400   21.9100 -108.8400       7.6        39       116        60
OIR    2025250     91400   21.9100 -108.8500       7.6        39       117        60
OIR    2025250     91400   21.9100 -108.8600       7.5        39       119        60
OIR    2025250     91400   21.9100 -108.8700       7.5        39       116        60
OIR    2025250     91400   21.9100 -108.8800       7.5        39       115        60
OIR    2025250     91400   21.9100 -108.8900       7.5        39       116        60
OIR    2025250     91400   21.9100 -108.9000       7.5        39       116        60
OIR    2025250     91400   21.9100 -108.9100       7.5        39       117        60
OIR    2025250     91400   21.9100 -108.9200       7.5        39       117        60
OIR    2025250     91400   21.9100 -108.9300       7.4        39       116        60
OIR    2025250     91400   21.9100 -108.9400       7.4        40       116        60
OIR    2025250     91400   21.9100 -108.9500       7.4        40       116        60
OIR    2025250     91400   21.9100 -108.9600       7.4        40       115        60
OIR    2025250     91400   21.9100 -108.9700       7.4        40       114        60
OIR    2025250     91400   21.9100 -108.9800       7.4        40       112        60
OIR    2025250     91400   21.9100 -108.9900       7.4        40       111        60
OIR    2025250     91400   21.9100 -109.0000       7.4        40       111        60
OIR    2025250     91400   21.9100 -109.0100       7.4        40       112        60
OIR    2025250     91400   21.9100 -109.0200       7.4        40       114        60
OIR    2025250     91400   21.9100 -109.0300       7.4        40       116        60
OIR    2025250     91400   21.9100 -109.0400       7.4        40       114        60
OIR    2025250     91400   21.9100 -109.0500       7.4        40       111        60
OIR    2025250     91400   21.9100 -109.0600       7.4        40       109        60
OIR    2025250     91400   21.9100 -109.0700       7.4        40       109        60
OIR    2025250     91400   21.9100 -109.0800       7.4        40       110        60
OIR    2025250     91400   21.9100 -109.0900       7.4        40       110        60
OIR    2025250     91400   21.9100 -109.1000       7.4        40       111        60
OIR    2025250     91400   21.9100 -109.1100       7.4        40       111        60
OIR    2025250     91400   21.9100 -109.1200       7.4        40       113        60
OIR    2025250     91400   21.9100 -109.1300       7.4        40       114        60
OIR    2025250     91400   21.9100 -109.1400       7.3        40       113        60
OIR    2025250     91400   21.9100 -109.1500       7.3        40       113        60
OIR    2025250     91400   21.9100 -109.1600       7.3        40       113        60
OIR    2025250     91400   21.9100 -109.1700       7.3        40       113        60
OIR    2025250     91400   21.9100 -109.1800       7.3        40       114        60
OIR    2025250     91400   21.9100 -109.1900       7.3        40       115        60
OIR    2025250     91400   21.9100 -109.2000       7.3        40       116        60
OIR    2025250     91400   21.9100 -109.2100       7.3        40       116        60
OIR    2025250     91400   21.9100 -109.2200       7.3        40       116        60
OIR    2025250     91400   21.9100 -109.2300       7.3        40       115        60
OIR    2025250     91400   21.9100 -109.2400       7.3        40       115        60
OIR    2025250     91400   21.9100 -109.2500       7.3        40       115        60
OIR    2025250     91400   21.9100 -109.2600       7.2        40       115        60
OIR    2025250     91400   21.9100 -109.2700       7.2        40       115        60
OIR    2025250     91400   21.9100 -109.2800       7.2        40       116        60
OIR    2025250     91400   21.9100 -109.2900       7.2        40       116        60
OIR    2025250     91400   21.9100 -109.3000       7.2        40       117        60
OIR    2025250     91400   21.9100 -109.3100       7.2        40       119        60
OIR    2025250     91400   21.9100 -109.3200       7.2        40       117        60
OIR    2025250     91400   21.9100 -109.3300       7.2        40       116        60
OIR    2025250     91400   21.9100 -109.3400       7.2        40       116        60
OIR    2025250     91400   21.9100 -109.3500       7.2        40       116        60
OIR    2025250     91400   21.9100 -109.3600       7.2        40       117        60
OIR    2025250     91400   21.9100 -109.3700       7.1        40       119        60
OIR    2025250     91400   21.9100 -109.3800       7.1        40       120        60
OIR    2025250     91400   21.9100 -109.3900       7.1        40       120        60
OIR    2025250     91400   21.9100 -109.4000       7.1        40       119        60
OIR    2025250     91400   21.9100 -109.4100       7.1        40       119        60
OIR    2025250     91400   21.9100 -109.4200       7.1        40       120        60
OIR    2025250     91400   21.9100 -109.4300       7.1        40       121        60
OIR    2025250     91400   21.9100 -109.4400       7.1        40       121        60
OIR    2025250     91400   21.9100 -109.4500       7.1        40       122        60
OIR    2025250     91400   21.9100 -109.4600       7.1        40       123        60
OIR    2025250     91400   21.9100 -109.4700       7.0        40       124        60
OIR    2025250     91400   21.9100 -109.4800       7.0        40       124        60
OIR    2025250     91400   21.9100 -109.4900       7.0        40       125        60
OIR    2025250     91400   21.9100 -109.5000       7.0        40       124        60
OIR    2025250     91400   21.9100 -109.5100       7.0        40       124        60
OIR    2025250     91400   21.9100 -109.5200       7.0        40       125        60
OIR    2025250     91400   21.9100 -109.5300       7.0        40       126        60
OIR    2025250     91400   21.9100 -109.5400       6.9        40       127        60
OIR    2025250     91400   21.9100 -109.5500       6.9        40       128        60
OIR    2025250     91400   21.9100 -109.5600       6.9        40       127        60
OIR    2025250     91400   21.9100 -109.5700       6.8        40       125        60
OIR    2025250     91400   21.9100 -109.5800       6.7        40       122        60
OIR    2025250     91400   21.9100 -109.5900       6.7        40       122        60
OIR    2025250     91400   21.9100 -109.6000       6.6        39       123        60
OIR    2025250     91400   21.9100 -109.6100       6.5        39       121        60
OIR    2025250     91400   21.9100 -109.6200       6.1        40       119        60
OIR    2025250     91400   21.9100 -109.6300       5.4        41       116        60
OIR    2025250     91400   21.9100 -109.6400       4.4        44       117        60
OIR    2025250     91400   21.9100 -109.6500       4.0        46       120        60
OIR    2025250     91400   21.9000 -108.6100       7.6        40       116        60
OIR    2025250     91400   21.9000 -108.6200       7.6        40       116        60
OIR    2025250     91400   21.9000 -108.6300       7.6        40       116        60
OIR    2025250     91400   21.9000 -108.6400       7.6        40       116        60
OIR    2025250     91400   21.9000 -108.6500       7.6        40       116        60
OIR    2025250     91400   21.9000 -108.6600       7.6        40       116        60
OIR    2025250     91400   21.9000 -108.6700       7.6        40       116        60
OIR    2025250     91400   21.9000 -108.6800       7.6        39       115        60
OIR    2025250     91400   21.9000 -108.6900       7.6        39       115        60
OIR    2025250     91400   21.9000 -108.7000       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.7100       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.7200       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.7300       7.6        39       117        60
OIR    2025250     91400   21.9000 -108.7400       7.6        39       117        60
OIR    2025250     91400   21.9000 -108.7500       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.7600       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.7700       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.7800       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.7900       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.8000       7.6        39       115        60
OIR    2025250     91400   21.9000 -108.8100       7.6        39       115        60
OIR    2025250     91400   21.9000 -108.8200       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.8300       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.8400       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.8500       7.6        39       116        60
OIR    2025250     91400   21.9000 -108.8600       7.6        39       117        60
OIR    2025250     91400   21.9000 -108.8700       7.5        39       116        60
OIR    2025250     91400   21.9000 -108.8800       7.5        39       114        60
OIR    2025250     91400   21.9000 -108.8900       7.5        39       114        60
OIR    2025250     91400   21.9000 -108.9000       7.5        39       116        60
OIR    2025250     91400   21.9000 -108.9100       7.5        39       117        60
OIR    2025250     91400   21.9000 -108.9200       7.5        40       116        60
OIR    2025250     91400   21.9000 -108.9300       7.5        40       115        60
OIR    2025250     91400   21.9000 -108.9400       7.4        40       114        60
OIR    2025250     91400   21.9000 -108.9500       7.4        40       114        60
OIR    2025250     91400   21.9000 -108.9600       7.4        40       114        60
OIR    2025250     91400   21.9000 -108.9700       7.4        40       113        60
OIR    2025250     91400   21.9000 -108.9800       7.4        40       111        60
OIR    2025250     91400   21.9000 -108.9900       7.4        40       110        60
OIR    2025250     91400   21.9000 -109.0000       7.4        40       111        60
OIR    2025250     91400   21.9000 -109.0100       7.4        40       113        60
OIR    2025250     91400   21.9000 -109.0200       7.4        40       114        60
OIR    2025250     91400   21.9000 -109.0300       7.4        40       116        60
OIR    2025250     91400   21.9000 -109.0400       7.4        40       115        60
OIR    2025250     91400   21.9000 -109.0500       7.4        40       113        60
OIR    2025250     91400   21.9000 -109.0600       7.4        40       110        60
OIR    2025250     91400   21.9000 -109.0700       7.4        40       109        60
OIR    2025250     91400   21.9000 -109.0800       7.4        40       109        60
OIR    2025250     91400   21.9000 -109.0900       7.4        40       110        60
OIR    2025250     91400   21.9000 -109.1000       7.4        40       111        60
OIR    2025250     91400   21.9000 -109.1100       7.4        40       112        60
OIR    2025250     91400   21.9000 -109.1200       7.4        40       113        60
OIR    2025250     91400   21.9000 -109.1300       7.4        40       114        60
OIR    2025250     91400   21.9000 -109.1400       7.4        40       114        60
OIR    2025250     91400   21.9000 -109.1500       7.4        40       113        60
OIR    2025250     91400   21.9000 -109.1600       7.3        40       112        60
OIR    2025250     91400   21.9000 -109.1700       7.3        40       112        60
OIR    2025250     91400   21.9000 -109.1800       7.3        40       112        60
OIR    2025250     91400   21.9000 -109.1900       7.3        40       113        60
OIR    2025250     91400   21.9000 -109.2000       7.3        40       115        60
OIR    2025250     91400   21.9000 -109.2100       7.3        40       116        60
OIR    2025250     91400   21.9000 -109.2200       7.3        40       116        60
OIR    2025250     91400   21.9000 -109.2300       7.3        40       116        60
OIR    2025250     91400   21.9000 -109.2400       7.3        40       116        60
OIR    2025250     91400   21.9000 -109.2500       7.3        40       115        60
OIR    2025250     91400   21.9000 -109.2600       7.2        40       115        60
OIR    2025250     91400   21.9000 -109.2700       7.2        40       115        60
OIR    2025250     91400   21.9000 -109.2800       7.2        40       114        60
OIR    2025250     91400   21.9000 -109.2900       7.2        40       115        60
OIR    2025250     91400   21.9000 -109.3000       7.2        40       116        60
OIR    2025250     91400   21.9000 -109.3100       7.2        40       116        60
OIR    2025250     91400   21.9000 -109.3200       7.2        40       116        60
OIR    2025250     91400   21.9000 -109.3300       7.2        40       116        60
OIR    2025250     91400   21.9000 -109.3400       7.2        40       116        60
OIR    2025250     91400   21.9000 -109.3500       7.2        40       115        60
OIR    2025250     91400   21.9000 -109.3600       7.2        40       114        60
OIR    2025250     91400   21.9000 -109.3700       7.1        40       115        60
OIR    2025250     91400   21.9000 -109.3800       7.1        40       116        60
OIR    2025250     91400   21.9000 -109.3900       7.1        40       116        60
OIR    2025250     91400   21.9000 -109.4000       7.1        40       116        60
OIR    2025250     91400   21.9000 -109.4100       7.1        40       116        60
OIR    2025250     91400   21.9000 -109.4200       7.1        40       117        60
OIR    2025250     91400   21.9000 -109.4300       7.1        40       119        60
OIR    2025250     91400   21.9000 -109.4400       7.1        40       120        60
OIR    2025250     91400   21.9000 -109.4500       7.1        40       121        60
OIR    2025250     91400   21.9000 -109.4600       7.1        40       122        60
OIR    2025250     91400   21.9000 -109.4700       7.0        40       122        60
OIR    2025250     91400   21.9000 -109.4800       7.0        40       122        60
OIR    2025250     91400   21.9000 -109.4900       7.0        40       122        60
OIR    2025250     91400   21.9000 -109.5000       7.0        40       123        60
OIR    2025250     91400   21.9000 -109.5100       7.0        40       124        60
OIR    2025250     91400   21.9000 -109.5200       7.0        40       124        60
OIR    2025250     91400   21.9000 -109.5300       6.9        40       124        60
OIR    2025250     91400   21.9000 -109.5400       6.9        40       125        60
OIR    2025250     91400   21.9000 -109.5500       6.9        40       126        60
OIR    2025250     91400   21.9000 -109.5600       6.9        40       127        60
OIR    2025250     91400   21.9000 -109.5700       6.8        40       125        60
OIR    2025250     91400   21.9000 -109.5800       6.7        40       123        60
OIR    2025250     91400   21.9000 -109.5900       6.7        40       123        60
OIR    2025250     91400   21.9000 -109.6000       6.6        39       122        60
OIR    2025250     91400   21.9000 -109.6100       6.5        39       122        60
OIR    2025250     91400   21.9000 -109.6200       6.2        39       120        60
OIR    2025250     91400   21.9000 -109.6300       5.6        40       119        60
OIR    2025250     91400   21.9000 -109.6400       4.5        43       120        60
OIR    2025250     91400   21.9000 -109.6500       4.0        45       121        60
OIR    2025250     91400   21.8900 -108.6100       7.6        40       114        60
OIR    2025250     91400   21.8900 -108.6200       7.6        40       114        60
OIR    2025250     91400   21.8900 -108.6300       7.6        40       114        60
OIR    2025250     91400   21.8900 -108.6400       7.6        40       114        60
OIR    2025250     91400   21.8900 -108.6500       7.6        40       115        60
OIR    2025250     91400   21.8900 -108.6600       7.6        40       116        60
OIR    2025250     91400   21.8900 -108.6700       7.6        40       116        60
OIR    2025250     91400   21.8900 -108.6800       7.6        40       115        60
OIR    2025250     91400   21.8900 -108.6900       7.6        39       116        60
OIR    2025250     91400   21.8900 -108.7000       7.6        39       116        60
OIR    2025250     91400   21.8900 -108.7100       7.6        39       116        60
OIR    2025250     91400   21.8900 -108.7200       7.6        39       116        60
OIR    2025250     91400   21.8900 -108.7300       7.6        39       115        60
OIR    2025250     91400   21.8900 -108.7400       7.6        39       115        60
OIR    2025250     91400   21.8900 -108.7500       7.6        39       115        60
OIR    2025250     91400   21.8900 -108.7600       7.6        39       116        60
OIR    2025250     91400   21.8900 -108.7700       7.6        39       115        60
OIR    2025250     91400   21.8900 -108.7800       7.6        39       115        60
OIR    2025250     91400   21.8900 -108.7900       7.6        39       114        60
OIR    2025250     91400   21.8900 -108.8000       7.6        39       114        60
OIR    2025250     91400   21.8900 -108.8100       7.6        39       113        60
OIR    2025250     91400   21.8900 -108.8200       7.6        39       113        60
OIR    2025250     91400   21.8900 -108.8300       7.6        39       114        60
OIR    2025250     91400   21.8900 -108.8400       7.6        39       115        60
OIR    2025250     91400   21.8900 -108.8500       7.6        39       116        60
OIR    2025250     91400   21.8900 -108.8600       7.6        39       116        60
OIR    2025250     91400   21.8900 -108.8700       7.5        39       116        60
OIR    2025250     91400   21.8900 -108.8800       7.5        39       114        60
OIR    2025250     91400   21.8900 -108.8900       7.5        39       114        60
OIR    2025250     91400   21.8900 -108.9000       7.5        40       115        60
OIR    2025250     91400   21.8900 -108.9100       7.5        40       116        60
OIR    2025250     91400   21.8900 -108.9200       7.5        40       115        60
OIR    2025250     91400   21.8900 -108.9300       7.5        40       113        60
OIR    2025250     91400   21.8900 -108.9400       7.5        40       112        60
OIR    2025250     91400   21.8900 -108.9500       7.5        40       113        60
OIR    2025250     91400   21.8900 -108.9600       7.4        40       114        60
OIR    2025250     91400   21.8900 -108.9700       7.4        40       112        60
OIR    2025250     91400   21.8900 -108.9800       7.4        40       110        60
OIR    2025250     91400   21.8900 -108.9900       7.4        40       109        60
OIR    2025250     91400   21.8900 -109.0000       7.4        40       111        60
OIR    2025250     91400   21.8900 -109.0100       7.4        40       113        60
OIR    2025250     91400   21.8900 -109.0200       7.4        40       115        60
OIR    2025250     91400   21.8900 -109.0300       7.4        40       116        60
OIR    2025250     91400   21.8900 -109.0400       7.4        40       116        60
OIR    2025250     91400   21.8900 -109.0500       7.4        40       114        60
OIR    2025250     91400   21.8900 -109.0600       7.4        40       111        60
OIR    2025250     91400   21.8900 -109.0700       7.4        40       109        60
OIR    2025250     91400   21.8900 -109.0800       7.4        40       109        60
OIR    2025250     91400   21.8900 -109.0900       7.4        40       110        60
OIR    2025250     91400   21.8900 -109.1000       7.4        40       111        60
OIR    2025250     91400   21.8900 -109.1100       7.4        40       113        60
OIR    2025250     91400   21.8900 -109.1200       7.4        40       114        60
OIR    2025250     91400   21.8900 -109.1300       7.4        40       115        60
OIR    2025250     91400   21.8900 -109.1400       7.4        40       116        60
OIR    2025250     91400   21.8900 -109.1500       7.4        40       114        60
OIR    2025250     91400   21.8900 -109.1600       7.4        40       112        60
OIR    2025250     91400   21.8900 -109.1700       7.3        40       112        60
OIR    2025250     91400   21.8900 -109.1800       7.3        40       112        60
OIR    2025250     91400   21.8900 -109.1900       7.3        40       113        60
OIR    2025250     91400   21.8900 -109.2000       7.3        40       114        60
OIR    2025250     91400   21.8900 -109.2100       7.3        40       115        60
OIR    2025250     91400   21.8900 -109.2200       7.3        40       115        60
OIR    2025250     91400   21.8900 -109.2300       7.3        40       115        60
OIR    2025250     91400   21.8900 -109.2400       7.3        40       115        60
OIR    2025250     91400   21.8900 -109.2500       7.3        40       115        60
OIR    2025250     91400   21.8900 -109.2600       7.3        40       115        60
OIR    2025250     91400   21.8900 -109.2700       7.2        40       115        60
OIR    2025250     91400   21.8900 -109.2800       7.2        40       114        60
OIR    2025250     91400   21.8900 -109.2900       7.2        40       114        60
OIR    2025250     91400   21.8900 -109.3000       7.2        40       114        60
OIR    2025250     91400   21.8900 -109.3100       7.2        40       115        60
OIR    2025250     91400   21.8900 -109.3200       7.2        40       115        60
OIR    2025250     91400   21.8900 -109.3300       7.2        40       116        60
OIR    2025250     91400   21.8900 -109.3400       7.2        40       116        60
OIR    2025250     91400   21.8900 -109.3500       7.2        40       115        60
OIR    2025250     91400   21.8900 -109.3600       7.2        40       113        60
OIR    2025250     91400   21.8900 -109.3700       7.1        40       114        60
OIR    2025250     91400   21.8900 -109.3800       7.1        40       115        60
OIR    2025250     91400   21.8900 -109.3900       7.1        40       116        60
OIR    2025250     91400   21.8900 -109.4000       7.1        40       116        60
OIR    2025250     91400   21.8900 -109.4100       7.1        40       116        60
OIR    2025250     91400   21.8900 -109.4200       7.1        40       116        60
OIR    2025250     91400   21.8900 -109.4300       7.1        40       116        60
OIR    2025250     91400   21.8900 -109.4400       7.1        40       117        60
OIR    2025250     91400   21.8900 -109.4500       7.1        40       120        60
OIR    2025250     91400   21.8900 -109.4600       7.1        40       121        60
OIR    2025250     91400   21.8900 -109.4700       7.0        40       121        60
OIR    2025250     91400   21.8900 -109.4800       7.0        40       121        60
OIR    2025250     91400   21.8900 -109.4900       7.0        40       120        60
OIR    2025250     91400   21.8900 -109.5000       7.0        40       121        60
OIR    2025250     91400   21.8900 -109.5100       7.0        40       123        60
OIR    2025250     91400   21.8900 -109.5200       7.0        40       123        60
OIR    2025250     91400   21.8900 -109.5300       6.9        40       123        60
OIR    2025250     91400   21.8900 -109.5400       6.9        40       123        60
OIR    2025250     91400   21.8900 -109.5500       6.9        40       125        60
OIR    2025250     91400   21.8900 -109.5600       6.9        40       126        60
OIR    2025250     91400   21.8900 -109.5700       6.8        40       125        60
OIR    2025250     91400   21.8900 -109.5800       6.8        40       124        60
OIR    2025250     91400   21.8900 -109.5900       6.7        40       123        60
OIR    2025250     91400   21.8900 -109.6000       6.7        40       123        60
OIR    2025250     91400   21.8900 -109.6100       6.6        40       122        60
OIR    2025250     91400   21.8900 -109.6200       6.3        40       121        60
OIR    2025250     91400   21.8900 -109.6300       5.6        41       121        60
OIR    2025250     91400   21.8900 -109.6400       4.6        43       121        60
OIR    2025250     91400   21.8900 -109.6500       4.0        45       122        60
OIR    2025250     91400   21.8800 -108.6100       7.6        40       111        60
OIR    2025250     91400   21.8800 -108.6200       7.6        40       112        60
OIR    2025250     91400   21.8800 -108.6300       7.6        40       111        60
OIR    2025250     91400   21.8800 -108.6400       7.6        40       111        60
OIR    2025250     91400   21.8800 -108.6500       7.6        40       112        60
OIR    2025250     91400   21.8800 -108.6600       7.6        40       113        60
OIR    2025250     91400   21.8800 -108.6700       7.6        40       114        60
OIR    2025250     91400   21.8800 -108.6800       7.6        40       115        60
OIR    2025250     91400   21.8800 -108.6900       7.6        40       115        60
OIR    2025250     91400   21.8800 -108.7000       7.6        39       116        60
OIR    2025250     91400   21.8800 -108.7100       7.6        39       116        60
OIR    2025250     91400   21.8800 -108.7200       7.6        39       115        60
OIR    2025250     91400   21.8800 -108.7300       7.6        39       114        60
OIR    2025250     91400   21.8800 -108.7400       7.6        39       113        60
OIR    2025250     91400   21.8800 -108.7500       7.6        39       113        60
OIR    2025250     91400   21.8800 -108.7600       7.6        39       114        60
OIR    2025250     91400   21.8800 -108.7700       7.6        39       113        60
OIR    2025250     91400   21.8800 -108.7800       7.6        39       113        60
OIR    2025250     91400   21.8800 -108.7900       7.6        39       112        60
OIR    2025250     91400   21.8800 -108.8000       7.6        39       112        60
OIR    2025250     91400   21.8800 -108.8100       7.6        39       111        60
OIR    2025250     91400   21.8800 -108.8200       7.6        39       111        60
OIR    2025250     91400   21.8800 -108.8300       7.6        39       111        60
OIR    2025250     91400   21.8800 -108.8400       7.6        39       111        60
OIR    2025250     91400   21.8800 -108.8500       7.6        39       113        60
OIR    2025250     91400   21.8800 -108.8600       7.6        39       114        60
OIR    2025250     91400   21.8800 -108.8700       7.6        40       115        60
OIR    2025250     91400   21.8800 -108.8800       7.5        40       115        60
OIR    2025250     91400   21.8800 -108.8900       7.5        40       115        60
OIR    2025250     91400   21.8800 -108.9000       7.5        40       114        60
OIR    2025250     91400   21.8800 -108.9100       7.5        40       114        60
OIR    2025250     91400   21.8800 -108.9200       7.5        40       113        60
OIR    2025250     91400   21.8800 -108.9300       7.5        40       113        60
OIR    2025250     91400   21.8800 -108.9400       7.5        40       112        60
OIR    2025250     91400   21.8800 -108.9500       7.5        40       113        60
OIR    2025250     91400   21.8800 -108.9600       7.5        40       113        60
OIR    2025250     91400   21.8800 -108.9700       7.4        40       113        60
OIR    2025250     91400   21.8800 -108.9800       7.4        40       111        60
OIR    2025250     91400   21.8800 -108.9900       7.4        40       109        60
OIR    2025250     91400   21.8800 -109.0000       7.4        40       110        60
OIR    2025250     91400   21.8800 -109.0100       7.4        40       112        60
OIR    2025250     91400   21.8800 -109.0200       7.4        40       113        60
OIR    2025250     91400   21.8800 -109.0300       7.4        40       115        60
OIR    2025250     91400   21.8800 -109.0400       7.4        40       116        60
OIR    2025250     91400   21.8800 -109.0500       7.4        40       114        60
OIR    2025250     91400   21.8800 -109.0600       7.4        40       112        60
OIR    2025250     91400   21.8800 -109.0700       7.4        40       110        60
OIR    2025250     91400   21.8800 -109.0800       7.4        40       110        60
OIR    2025250     91400   21.8800 -109.0900       7.4        40       110        60
OIR    2025250     91400   21.8800 -109.1000       7.4        40       111        60
OIR    2025250     91400   21.8800 -109.1100       7.4        40       112        60
OIR    2025250     91400   21.8800 -109.1200       7.4        40       113        60
OIR    2025250     91400   21.8800 -109.1300       7.4        40       114        60
OIR    2025250     91400   21.8800 -109.1400       7.4        40       115        60
OIR    2025250     91400   21.8800 -109.1500       7.4        40       115        60
OIR    2025250     91400   21.8800 -109.1600       7.4        40       113        60
OIR    2025250     91400   21.8800 -109.1700       7.4        40       113        60
OIR    2025250     91400   21.8800 -109.1800       7.3        40       113        60
OIR    2025250     91400   21.8800 -109.1900       7.3        40       113        60
OIR    2025250     91400   21.8800 -109.2000       7.3        40       113        60
OIR    2025250     91400   21.8800 -109.2100       7.3        40       114        60
OIR    2025250     91400   21.8800 -109.2200       7.3        40       114        60
OIR    2025250     91400   21.8800 -109.2300       7.3        40       115        60
OIR    2025250     91400   21.8800 -109.2400       7.3        40       115        60
OIR    2025250     91400   21.8800 -109.2500       7.3        40       115        60
OIR    2025250     91400   21.8800 -109.2600       7.3        40       115        60
OIR    2025250     91400   21.8800 -109.2700       7.2        40       115        60
OIR    2025250     91400   21.8800 -109.2800       7.2        40       114        60
OIR    2025250     91400   21.8800 -109.2900       7.2        40       113        60
OIR    2025250     91400   21.8800 -109.3000       7.2        40       113        60
OIR    2025250     91400   21.8800 -109.3100       7.2        40       113        60
OIR    2025250     91400   21.8800 -109.3200       7.2        40       114        60
OIR    2025250     91400   21.8800 -109.3300       7.2        40       114        60
OIR    2025250     91400   21.8800 -109.3400       7.2        40       115        60
OIR    2025250     91400   21.8800 -109.3500       7.2        40       114        60
OIR    2025250     91400   21.8800 -109.3600       7.2        40       113        60
OIR    2025250     91400   21.8800 -109.3700       7.1        40       113        60
OIR    2025250     91400   21.8800 -109.3800       7.1        40       114        60
OIR    2025250     91400   21.8800 -109.3900       7.1        40       115        60
OIR    2025250     91400   21.8800 -109.4000       7.1        40       115        60
OIR    2025250     91400   21.8800 -109.4100       7.1        40       115        60
OIR    2025250     91400   21.8800 -109.4200       7.1        40       115        60
OIR    2025250     91400   21.8800 -109.4300       7.1        40       115        60
OIR    2025250     91400   21.8800 -109.4400       7.1        40       116        60
OIR    2025250     91400   21.8800 -109.4500       7.1        40       117        60
OIR    2025250     91400   21.8800 -109.4600       7.1        40       121        60
OIR    2025250     91400   21.8800 -109.4700       7.0        40       122        60
OIR    2025250     91400   21.8800 -109.4800       7.0        40       121        60
OIR    2025250     91400   21.8800 -109.4900       7.0        40       121        60
OIR    2025250     91400   21.8800 -109.5000       7.0        40       121        60
OIR    2025250     91400   21.8800 -109.5100       7.0        40       122        60
OIR    2025250     91400   21.8800 -109.5200       7.0        40       122        60
OIR    2025250     91400   21.8800 -109.5300       6.9        40       122        60
OIR    2025250     91400   21.8800 -109.5400       6.9        40       122        60
OIR    2025250     91400   21.8800 -109.5500       6.9        40       123        60
OIR    2025250     91400   21.8800 -109.5600       6.8        40       124        60
OIR    2025250     91400   21.8800 -109.5700       6.8        40       123        60
OIR    2025250     91400   21.8800 -109.5800       6.8        40       123        60
OIR    2025250     91400   21.8800 -109.5900       6.7        40       123        60
OIR    2025250     91400   21.8800 -109.6000       6.7        40       123        60
OIR    2025250     91400   21.8800 -109.6100       6.6        40       123        60
OIR    2025250     91400   21.8800 -109.6200       6.4        40       123        60
OIR    2025250     91400   21.8800 -109.6300       5.7        41       123        60
OIR    2025250     91400   21.8800 -109.6400       4.7        43       123        60
OIR    2025250     91400   21.8800 -109.6500       4.0        45       123        60
OIR    2025250     91400   21.8700 -108.6100       7.6        40       107        60
OIR    2025250     91400   21.8700 -108.6200       7.6        40       108        60
OIR    2025250     91400   21.8700 -108.6300       7.6        40       109        60
OIR    2025250     91400   21.8700 -108.6400       7.6        40       109        60
OIR    2025250     91400   21.8700 -108.6500       7.6        40       110        60
OIR    2025250     91400   21.8700 -108.6600       7.6        40       110        60
OIR    2025250     91400   21.8700 -108.6700       7.6        40       110        60
OIR    2025250     91400   21.8700 -108.6800       7.6        40       112        60
OIR    2025250     91400   21.8700 -108.6900       7.6        40       113        60
OIR    2025250     91400   21.8700 -108.7000       7.6        40       114        60
OIR    2025250     91400   21.8700 -108.7100       7.6        40       114        60
OIR    2025250     91400   21.8700 -108.7200       7.6        39       115        60
OIR    2025250     91400   21.8700 -108.7300       7.6        39       114        60
OIR    2025250     91400   21.8700 -108.7400       7.6        39       113        60
OIR    2025250     91400   21.8700 -108.7500       7.6        39       112        60
OIR    2025250     91400   21.8700 -108.7600       7.6        39       112        60
OIR    2025250     91400   21.8700 -108.7700       7.6        39       111        60
OIR    2025250     91400   21.8700 -108.7800       7.6        39       110        60
OIR    2025250     91400   21.8700 -108.7900       7.6        39       110        60
OIR    2025250     91400   21.8700 -108.8000       7.6        39       110        60
OIR    2025250     91400   21.8700 -108.8100       7.6        39       110        60
OIR    2025250     91400   21.8700 -108.8200       7.6        39       110        60
OIR    2025250     91400   21.8700 -108.8300       7.6        39       110        60
OIR    2025250     91400   21.8700 -108.8400       7.6        40       110        60
OIR    2025250     91400   21.8700 -108.8500       7.6        40       111        60
OIR    2025250     91400   21.8700 -108.8600       7.6        40       113        60
OIR    2025250     91400   21.8700 -108.8700       7.6        40       114        60
OIR    2025250     91400   21.8700 -108.8800       7.5        40       114        60
OIR    2025250     91400   21.8700 -108.8900       7.5        40       114        60
OIR    2025250     91400   21.8700 -108.9000       7.5        40       113        60
OIR    2025250     91400   21.8700 -108.9100       7.5        40       113        60
OIR    2025250     91400   21.8700 -108.9200       7.5        40       112        60
OIR    2025250     91400   21.8700 -108.9300       7.5        40       112        60
OIR    2025250     91400   21.8700 -108.9400       7.5        40       112        60
OIR    2025250     91400   21.8700 -108.9500       7.5        40       112        60
OIR    2025250     91400   21.8700 -108.9600       7.5        40       113        60
OIR    2025250     91400   21.8700 -108.9700       7.5        40       113        60
OIR    2025250     91400   21.8700 -108.9800       7.5        40       111        60
OIR    2025250     91400   21.8700 -108.9900       7.4        40       110        60
OIR    2025250     91400   21.8700 -109.0000       7.4        40       110        60
OIR    2025250     91400   21.8700 -109.0100       7.4        40       111        60
OIR    2025250     91400   21.8700 -109.0200       7.4        40       112        60
OIR    2025250     91400   21.8700 -109.0300       7.4        40       113        60
OIR    2025250     91400   21.8700 -109.0400       7.4        40       115        60
OIR    2025250     91400   21.8700 -109.0500       7.4        40       114        60
OIR    2025250     91400   21.8700 -109.0600       7.4        40       113        60
OIR    2025250     91400   21.8700 -109.0700       7.4        40       112        60
OIR    2025250     91400   21.8700 -109.0800       7.4        40       111        60
OIR    2025250     91400   21.8700 -109.0900       7.4        40       110        60
OIR    2025250     91400   21.8700 -109.1000       7.4        40       111        60
OIR    2025250     91400   21.8700 -109.1100       7.4        40       112        60
OIR    2025250     91400   21.8700 -109.1200       7.4        40       113        60
OIR    2025250     91400   21.8700 -109.1300       7.4        40       113        60
OIR    2025250     91400   21.8700 -109.1400       7.4        40       113        60
OIR    2025250     91400   21.8700 -109.1500       7.4        40       114        60
OIR    2025250     91400   21.8700 -109.1600       7.4        40       114        60
OIR    2025250     91400   21.8700 -109.1700       7.4        40       114        60
OIR    2025250     91400   21.8700 -109.1800       7.4        40       114        60
OIR    2025250     91400   21.8700 -109.1900       7.3        40       113        60
OIR    2025250     91400   21.8700 -109.2000       7.3        40       113        60
OIR    2025250     91400   21.8700 -109.2100       7.3        40       113        60
OIR    2025250     91400   21.8700 -109.2200       7.3        40       114        60
OIR    2025250     91400   21.8700 -109.2300       7.3        40       115        60
OIR    2025250     91400   21.8700 -109.2400       7.3        40       115        60
OIR    2025250     91400   21.8700 -109.2500       7.3        40       116        60
OIR    2025250     91400   21.8700 -109.2600       7.3        40       116        60
OIR    2025250     91400   21.8700 -109.2700       7.2        40       116        60
OIR    2025250     91400   21.8700 -109.2800       7.2        40       116        60
OIR    2025250     91400   21.8700 -109.2900       7.2        40       116        60
OIR    2025250     91400   21.8700 -109.3000       7.2        40       116        60
OIR    2025250     91400   21.8700 -109.3100       7.2        40       116        60
OIR    2025250     91400   21.8700 -109.3200       7.2        40       116        60
OIR    2025250     91400   21.8700 -109.3300       7.2        40       116        60
OIR    2025250     91400   21.8700 -109.3400       7.2        40       115        60
OIR    2025250     91400   21.8700 -109.3500       7.2        40       115        60
OIR    2025250     91400   21.8700 -109.3600       7.2        40       114        60
OIR    2025250     91400   21.8700 -109.3700       7.1        40       113        60
OIR    2025250     91400   21.8700 -109.3800       7.1        40       114        60
OIR    2025250     91400   21.8700 -109.3900       7.1        40       114        60
OIR    2025250     91400   21.8700 -109.4000       7.1        40       115        60
OIR    2025250     91400   21.8700 -109.4100       7.1        40       115        60
OIR    2025250     91400   21.8700 -109.4200       7.1        40       116        60
OIR    2025250     91400   21.8700 -109.4300       7.1        40       115        60
OIR    2025250     91400   21.8700 -109.4400       7.1        40       115        60
OIR    2025250     91400   21.8700 -109.4500       7.1        40       116        60
OIR    2025250     91400   21.8700 -109.4600       7.0        40       119        60
OIR    2025250     91400   21.8700 -109.4700       7.0        40       121        60
OIR    2025250     91400   21.8700 -109.4800       7.0        40       121        60
OIR    2025250     91400   21.8700 -109.4900       7.0        40       120        60
OIR    2025250     91400   21.8700 -109.5000       7.0        40       121        60
OIR    2025250     91400   21.8700 -109.5100       7.0        40       121        60
OIR    2025250     91400   21.8700 -109.5200       6.9        40       121        60
OIR    2025250     91400   21.8700 -109.5300       6.9        40       121        60
OIR    2025250     91400   21.8700 -109.5400       6.9        40       120        60
OIR    2025250     91400   21.8700 -109.5500       6.9        40       121        60
OIR    2025250     91400   21.8700 -109.5600       6.8        40       121        60
OIR    2025250     91400   21.8700 -109.5700       6.8        40       122        60
OIR    2025250     91400   21.8700 -109.5800       6.8        40       122        60
OIR    2025250     91400   21.8700 -109.5900       6.7        40       122        60
OIR    2025250     91400   21.8700 -109.6000       6.7        40       123        60
OIR    2025250     91400   21.8700 -109.6100       6.6        40       124        60
OIR    2025250     91400   21.8700 -109.6200       6.4        40       124        60
OIR    2025250     91400   21.8700 -109.6300       5.9        41       125        60
OIR    2025250     91400   21.8700 -109.6400       4.9        42       125        60
OIR    2025250     91400   21.8700 -109.6500       4.0        45       124        60
OIR    2025250     91400   21.8600 -108.6100       7.6        40       107        60
OIR    2025250     91400   21.8600 -108.6200       7.6        40       107        60
OIR    2025250     91400   21.8600 -108.6300       7.6        40       108        60
OIR    2025250     91400   21.8600 -108.6400       7.6        40       109        60
OIR    2025250     91400   21.8600 -108.6500       7.6        40       109        60
OIR    2025250     91400   21.8600 -108.6600       7.6        40       108        60
OIR    2025250     91400   21.8600 -108.6700       7.6        40       108        60
OIR    2025250     91400   21.8600 -108.6800       7.6        40       109        60
OIR    2025250     91400   21.8600 -108.6900       7.6        40       111        60
OIR    2025250     91400   21.8600 -108.7000       7.6        40       112        60
OIR    2025250     91400   21.8600 -108.7100       7.6        40       113        60
OIR    2025250     91400   21.8600 -108.7200       7.6        40       113        60
OIR    2025250     91400   21.8600 -108.7300       7.6        40       113        60
OIR    2025250     91400   21.8600 -108.7400       7.6        40       113        60
OIR    2025250     91400   21.8600 -108.7500       7.6        39       112        60
OIR    2025250     91400   21.8600 -108.7600       7.6        39       110        60
OIR    2025250     91400   21.8600 -108.7700       7.6        39       108        60
OIR    2025250     91400   21.8600 -108.7800       7.6        39       108        60
OIR    2025250     91400   21.8600 -108.7900       7.6        40       108        60
OIR    2025250     91400   21.8600 -108.8000       7.6        40       108        60
OIR    2025250     91400   21.8600 -108.8100       7.6        40       109        60
OIR    2025250     91400   21.8600 -108.8200       7.6        40       110        60
OIR    2025250     91400   21.8600 -108.8300       7.6        40       110        60
OIR    2025250     91400   21.8600 -108.8400       7.6        40       110        60
OIR    2025250     91400   21.8600 -108.8500       7.6        40       110        60
OIR    2025250     91400   21.8600 -108.8600       7.6        40       111        60
OIR    2025250     91400   21.8600 -108.8700       7.6        40       112        60
OIR    2025250     91400   21.8600 -108.8800       7.5        40       112        60
OIR    2025250     91400   21.8600 -108.8900       7.5        40       112        60
OIR    2025250     91400   21.8600 -108.9000       7.5        40       112        60
OIR    2025250     91400   21.8600 -108.9100       7.5        40       111        60
OIR    2025250     91400   21.8600 -108.9200       7.5        40       111        60
OIR    2025250     91400   21.8600 -108.9300       7.5        40       111        60
OIR    2025250     91400   21.8600 -108.9400       7.5        40       111        60
OIR    2025250     91400   21.8600 -108.9500       7.5        40       112        60
OIR    2025250     91400   21.8600 -108.9600       7.5        40       112        60
OIR    2025250     91400   21.8600 -108.9700       7.5        40       113        60
OIR    2025250     91400   21.8600 -108.9800       7.5        40       112        60
OIR    2025250     91400   21.8600 -108.9900       7.5        40       111        60
OIR    2025250     91400   21.8600 -109.0000       7.4        40       110        60
OIR    2025250     91400   21.8600 -109.0100       7.4        40       110        60
OIR    2025250     91400   21.8600 -109.0200       7.4        40       110        60
OIR    2025250     91400   21.8600 -109.0300       7.4        40       111        60
OIR    2025250     91400   21.8600 -109.0400       7.4        40       112        60
OIR    2025250     91400   21.8600 -109.0500       7.4        40       112        60
OIR    2025250     91400   21.8600 -109.0600       7.4        40       112        60
OIR    2025250     91400   21.8600 -109.0700       7.4        40       111        60
OIR    2025250     91400   21.8600 -109.0800       7.4        40       111        60
OIR    2025250     91400   21.8600 -109.0900       7.4        40       110        60
OIR    2025250     91400   21.8600 -109.1000       7.4        40       110        60
OIR    2025250     91400   21.8600 -109.1100       7.4        40       111        60
OIR    2025250     91400   21.8600 -109.1200       7.4        40       112        60
OIR    2025250     91400   21.8600 -109.1300       7.4        40       112        60
OIR    2025250     91400   21.8600 -109.1400       7.4        40       112        60
OIR    2025250     91400   21.8600 -109.1500       7.4        40       112        60
OIR    2025250     91400   21.8600 -109.1600       7.4        40       113        60
OIR    2025250     91400   21.8600 -109.1700       7.4        40       115        60
OIR    2025250     91400   21.8600 -109.1800       7.4        40       115        60
OIR    2025250     91400   21.8600 -109.1900       7.4        40       114        60
OIR    2025250     91400   21.8600 -109.2000       7.3        41       114        60
OIR    2025250     91400   21.8600 -109.2100       7.3        41       114        60
OIR    2025250     91400   21.8600 -109.2200       7.3        41       113        60
OIR    2025250     91400   21.8600 -109.2300       7.3        41       114        60
OIR    2025250     91400   21.8600 -109.2400       7.3        41       115        60
OIR    2025250     91400   21.8600 -109.2500       7.3        41       116        60
OIR    2025250     91400   21.8600 -109.2600       7.3        41       116        60
OIR    2025250     91400   21.8600 -109.2700       7.2        41       116        60
OIR    2025250     91400   21.8600 -109.2800       7.2        41       116        60
OIR    2025250     91400   21.8600 -109.2900       7.2        41       116        60
OIR    2025250     91400   21.8600 -109.3000       7.2        41       117        60
OIR    2025250     91400   21.8600 -109.3100       7.2        41       117        60
OIR    2025250     91400   21.8600 -109.3200       7.2        41       117        60
OIR    2025250     91400   21.8600 -109.3300       7.2        41       116        60
OIR    2025250     91400   21.8600 -109.3400       7.2        41       116        60
OIR    2025250     91400   21.8600 -109.3500       7.2        40       116        60
OIR    2025250     91400   21.8600 -109.3600       7.2        40       115        60
OIR    2025250     91400   21.8600 -109.3700       7.2        41       114        60
OIR    2025250     91400   21.8600 -109.3800       7.1        41       114        60
OIR    2025250     91400   21.8600 -109.3900       7.1        41       113        60
OIR    2025250     91400   21.8600 -109.4000       7.1        41       114        60
OIR    2025250     91400   21.8600 -109.4100       7.1        41       116        60
OIR    2025250     91400   21.8600 -109.4200       7.1        41       116        60
OIR    2025250     91400   21.8600 -109.4300       7.1        40       116        60
OIR    2025250     91400   21.8600 -109.4400       7.1        40       115        60
OIR    2025250     91400   21.8600 -109.4500       7.1        40       115        60
OIR    2025250     91400   21.8600 -109.4600       7.0        40       116        60
OIR    2025250     91400   21.8600 -109.4700       7.0        40       120        60
OIR    2025250     91400   21.8600 -109.4800       7.0        40       119        60
OIR    2025250     91400   21.8600 -109.4900       7.0        40       119        60
OIR    2025250     91400   21.8600 -109.5000       7.0        40       119        60
OIR    2025250     91400   21.8600 -109.5100       7.0        40       121        60
OIR    2025250     91400   21.8600 -109.5200       6.9        40       122        60
OIR    2025250     91400   21.8600 -109.5300       6.9        40       121        60
OIR    2025250     91400   21.8600 -109.5400       6.9        40       120        60
OIR    2025250     91400   21.8600 -109.5500       6.9        40       120        60
OIR    2025250     91400   21.8600 -109.5600       6.8        40       121        60
OIR    2025250     91400   21.8600 -109.5700       6.8        40       122        60
OIR    2025250     91400   21.8600 -109.5800       6.8        40       122        60
OIR    2025250     91400   21.8600 -109.5900       6.7        40       122        60
OIR    2025250     91400   21.8600 -109.6000       6.7        40       122        60
OIR    2025250     91400   21.8600 -109.6100       6.6        40       123        60
OIR    2025250     91400   21.8600 -109.6200       6.5        40       123        60
OIR    2025250     91400   21.8600 -109.6300       6.0        40       124        60
OIR    2025250     91400   21.8600 -109.6400       5.0        42       126        60
OIR    2025250     91400   21.8600 -109.6500       4.1        44       125        60
OIR    2025250     91400   21.8500 -108.6100       7.6        40       107        60
OIR    2025250     91400   21.8500 -108.6200       7.6        40       108        60
OIR    2025250     91400   21.8500 -108.6300       7.6        40       108        60
OIR    2025250     91400   21.8500 -108.6400       7.6        40       110        60
OIR    2025250     91400   21.8500 -108.6500       7.6        40       110        60
OIR    2025250     91400   21.8500 -108.6600       7.6        40       110        60
OIR    2025250     91400   21.8500 -108.6700       7.6        40       109        60
OIR    2025250     91400   21.8500 -108.6800       7.6        40       109        60
OIR    2025250     91400   21.8500 -108.6900       7.6        40       110        60
OIR    2025250     91400   21.8500 -108.7000       7.6        40       111        60
OIR    2025250     91400   21.8500 -108.7100       7.6        40       112        60
OIR    2025250     91400   21.8500 -108.7200       7.6        40       113        60
OIR    2025250     91400   21.8500 -108.7300       7.6        40       113        60
OIR    2025250     91400   21.8500 -108.7400       7.6        40       113        60
OIR    2025250     91400   21.8500 -108.7500       7.6        40       112        60
OIR    2025250     91400   21.8500 -108.7600       7.6        40       111        60
OIR    2025250     91400   21.8500 -108.7700       7.6        40       109        60
OIR    2025250     91400   21.8500 -108.7800       7.6        40       109        60
OIR    2025250     91400   21.8500 -108.7900       7.6        40       109        60
OIR    2025250     91400   21.8500 -108.8000       7.6        40       109        60
OIR    2025250     91400   21.8500 -108.8100       7.6        40       109        60
OIR    2025250     91400   21.8500 -108.8200       7.6        40       110        60
OIR    2025250     91400   21.8500 -108.8300       7.6        40       110        60
OIR    2025250     91400   21.8500 -108.8400       7.6        40       111        60
OIR    2025250     91400   21.8500 -108.8500       7.6        40       111        60
OIR    2025250     91400   21.8500 -108.8600       7.6        40       111        60
OIR    2025250     91400   21.8500 -108.8700       7.6        40       111        60
OIR    2025250     91400   21.8500 -108.8800       7.6        40       111        60
OIR    2025250     91400   21.8500 -108.8900       7.5        40       111        60
OIR    2025250     91400   21.8500 -108.9000       7.5        40       111        60
OIR    2025250     91400   21.8500 -108.9100       7.5        40       111        60
OIR    2025250     91400   21.8500 -108.9200       7.5        40       110        60
OIR    2025250     91400   21.8500 -108.9300       7.5        40       111        60
OIR    2025250     91400   21.8500 -108.9400       7.5        40       111        60
OIR    2025250     91400   21.8500 -108.9500       7.5        40       112        60
OIR    2025250     91400   21.8500 -108.9600       7.5        40       112        60
OIR    2025250     91400   21.8500 -108.9700       7.5        40       113        60
OIR    2025250     91400   21.8500 -108.9800       7.5        40       112        60
OIR    2025250     91400   21.8500 -108.9900       7.5        40       111        60
OIR    2025250     91400   21.8500 -109.0000       7.5        40       110        60
OIR    2025250     91400   21.8500 -109.0100       7.4        40       109        60
OIR    2025250     91400   21.8500 -109.0200       7.4        40       108        60
OIR    2025250     91400   21.8500 -109.0300       7.4        40       108        60
OIR    2025250     91400   21.8500 -109.0400       7.4        40       109        60
OIR    2025250     91400   21.8500 -109.0500       7.4        40       110        60
OIR    2025250     91400   21.8500 -109.0600       7.4        40       110        60
OIR    2025250     91400   21.8500 -109.0700       7.4        40       110        60
OIR    2025250     91400   21.8500 -109.0800       7.4        40       110        60
OIR    2025250     91400   21.8500 -109.0900       7.4        41       110        60
OIR    2025250     91400   21.8500 -109.1000       7.4        41       110        60
OIR    2025250     91400   21.8500 -109.1100       7.4        41       110        60
OIR    2025250     91400   21.8500 -109.1200       7.4        41       111        60
OIR    2025250     91400   21.8500 -109.1300       7.4        41       111        60
OIR    2025250     91400   21.8500 -109.1400       7.4        41       111        60
OIR    2025250     91400   21.8500 -109.1500       7.4        41       111        60
OIR    2025250     91400   21.8500 -109.1600       7.4        41       112        60
OIR    2025250     91400   21.8500 -109.1700       7.4        41       114        60
OIR    2025250     91400   21.8500 -109.1800       7.4        41       115        60
OIR    2025250     91400   21.8500 -109.1900       7.4        41       116        60
OIR    2025250     91400   21.8500 -109.2000       7.3        41       116        60
OIR    2025250     91400   21.8500 -109.2100       7.3        41       115        60
OIR    2025250     91400   21.8500 -109.2200       7.3        41       114        60
OIR    2025250     91400   21.8500 -109.2300       7.3        41       114        60
OIR    2025250     91400   21.8500 -109.2400       7.3        41       115        60
OIR    2025250     91400   21.8500 -109.2500       7.3        41       116        60
OIR    2025250     91400   21.8500 -109.2600       7.3        41       115        60
OIR    2025250     91400   21.8500 -109.2700       7.3        41       115        60
OIR    2025250     91400   21.8500 -109.2800       7.2        41       115        60
OIR    2025250     91400   21.8500 -109.2900       7.2        41       115        60
OIR    2025250     91400   21.8500 -109.3000       7.2        41       115        60
OIR    2025250     91400   21.8500 -109.3100       7.2        41       116        60
OIR    2025250     91400   21.8500 -109.3200       7.2        41       116        60
OIR    2025250     91400   21.8500 -109.3300       7.2        41       116        60
OIR    2025250     91400   21.8500 -109.3400       7.2        41       115        60
OIR    2025250     91400   21.8500 -109.3500       7.2        41       115        60
OIR    2025250     91400   21.8500 -109.3600       7.2        41       115        60
OIR    2025250     91400   21.8500 -109.3700       7.1        41       115        60
OIR    2025250     91400   21.8500 -109.3800       7.1        41       114        60
OIR    2025250     91400   21.8500 -109.3900       7.1        41       113        60
OIR    2025250     91400   21.8500 -109.4000       7.1        41       113        60
OIR    2025250     91400   21.8500 -109.4100       7.1        41       115        60
OIR    2025250     91400   21.8500 -109.4200       7.1        41       116        60
OIR    2025250     91400   21.8500 -109.4300       7.1        41       117        60
OIR    2025250     91400   21.8500 -109.4400       7.1        41       116        60
OIR    2025250     91400   21.8500 -109.4500       7.0        40       116        60
OIR    2025250     91400   21.8500 -109.4600       7.0        40       116        60
OIR    2025250     91400   21.8500 -109.4700       7.0        40       117        60
OIR    2025250     91400   21.8500 -109.4800       7.0        40       117        60
OIR    2025250     91400   21.8500 -109.4900       7.0        40       116        60
OIR    2025250     91400   21.8500 -109.5000       7.0        40       116        60
OIR    2025250     91400   21.8500 -109.5100       6.9        40       119        60
OIR    2025250     91400   21.8500 -109.5200       6.9        40       122        60
OIR    2025250     91400   21.8500 -109.5300       6.9        40       121        60
OIR    2025250     91400   21.8500 -109.5400       6.9        40       119        60
OIR    2025250     91400   21.8500 -109.5500       6.8        40       117        60
OIR    2025250     91400   21.8500 -109.5600       6.8        40       120        60
OIR    2025250     91400   21.8500 -109.5700       6.8        40       121        60
OIR    2025250     91400   21.8500 -109.5800       6.7        40       122        60
OIR    2025250     91400   21.8500 -109.5900       6.7        40       122        60
OIR    2025250     91400   21.8500 -109.6000       6.7        40       122        60
OIR    2025250     91400   21.8500 -109.6100       6.6        40       122        60
OIR    2025250     91400   21.8500 -109.6200       6.5        40       122        60
OIR    2025250     91400   21.8500 -109.6300       6.0        40       123        60
OIR    2025250     91400   21.8500 -109.6400       5.0        42       124        60
OIR    2025250     91400   21.8500 -109.6500       4.1        44       125        60
OIR    2025250     91400   21.8400 -108.6100       7.7        40       107        60
OIR    2025250     91400   21.8400 -108.6200       7.6        40       108        60
OIR    2025250     91400   21.8400 -108.6300       7.6        40       108        60
OIR    2025250     91400   21.8400 -108.6400       7.6        40       109        60
OIR    2025250     91400   21.8400 -108.6500       7.6        40       110        60
OIR    2025250     91400   21.8400 -108.6600       7.7        40       110        60
OIR    2025250     91400   21.8400 -108.6700       7.7        40       110        60
OIR    2025250     91400   21.8400 -108.6800       7.7        40       110        60
OIR    2025250     91400   21.8400 -108.6900       7.6        40       110        60
OIR    2025250     91400   21.8400 -108.7000       7.6        40       110        60
OIR    2025250     91400   21.8400 -108.7100       7.6        40       111        60
OIR    2025250     91400   21.8400 -108.7200       7.6        40       113        60
OIR    2025250     91400   21.8400 -108.7300       7.6        40       113        60
OIR    2025250     91400   21.8400 -108.7400       7.6        40       113        60
OIR    2025250     91400   21.8400 -108.7500       7.6        40       112        60
OIR    2025250     91400   21.8400 -108.7600       7.6        40       111        60
OIR    2025250     91400   21.8400 -108.7700       7.6        40       110        60
OIR    2025250     91400   21.8400 -108.7800       7.6        40       109        60
OIR    2025250     91400   21.8400 -108.7900       7.6        40       110        60
OIR    2025250     91400   21.8400 -108.8000       7.6        40       110        60
OIR    2025250     91400   21.8400 -108.8100       7.6        40       110        60
OIR    2025250     91400   21.8400 -108.8200       7.6        40       110        60
OIR    2025250     91400   21.8400 -108.8300       7.6        40       111        60
OIR    2025250     91400   21.8400 -108.8400       7.6        40       112        60
OIR    2025250     91400   21.8400 -108.8500       7.6        40       113        60
OIR    2025250     91400   21.8400 -108.8600       7.6        40       113        60
OIR    2025250     91400   21.8400 -108.8700       7.6        40       112        60
OIR    2025250     91400   21.8400 -108.8800       7.6        40       112        60
OIR    2025250     91400   21.8400 -108.8900       7.5        40       112        60
OIR    2025250     91400   21.8400 -108.9000       7.5        40       112        60
OIR    2025250     91400   21.8400 -108.9100       7.5        40       112        60
OIR    2025250     91400   21.8400 -108.9200       7.5        40       112        60
OIR    2025250     91400   21.8400 -108.9300       7.5        40       113        60
OIR    2025250     91400   21.8400 -108.9400       7.5        40       113        60
OIR    2025250     91400   21.8400 -108.9500       7.5        40       114        60
OIR    2025250     91400   21.8400 -108.9600       7.5        40       114        60
OIR    2025250     91400   21.8400 -108.9700       7.5        40       114        60
OIR    2025250     91400   21.8400 -108.9800       7.5        40       114        60
OIR    2025250     91400   21.8400 -108.9900       7.5        41       113        60
OIR    2025250     91400   21.8400 -109.0000       7.5        41       111        60
OIR    2025250     91400   21.8400 -109.0100       7.5        41       111        60
OIR    2025250     91400   21.8400 -109.0200       7.5        41       110        60
OIR    2025250     91400   21.8400 -109.0300       7.4        41       109        60
OIR    2025250     91400   21.8400 -109.0400       7.4        41       110        60
OIR    2025250     91400   21.8400 -109.0500       7.4        41       111        60
OIR    2025250     91400   21.8400 -109.0600       7.4        41       110        60
OIR    2025250     91400   21.8400 -109.0700       7.4        41       110        60
OIR    2025250     91400   21.8400 -109.0800       7.4        41       110        60
OIR    2025250     91400   21.8400 -109.0900       7.4        41       110        60
OIR    2025250     91400   21.8400 -109.1000       7.4        41       111        60
OIR    2025250     91400   21.8400 -109.1100       7.4        41       111        60
OIR    2025250     91400   21.8400 -109.1200       7.4        41       111        60
OIR    2025250     91400   21.8400 -109.1300       7.4        41       111        60
OIR    2025250     91400   21.8400 -109.1400       7.4        41       111        60
OIR    2025250     91400   21.8400 -109.1500       7.4        41       111        60
OIR    2025250     91400   21.8400 -109.1600       7.4        41       112        60
OIR    2025250     91400   21.8400 -109.1700       7.4        41       113        60
OIR    2025250     91400   21.8400 -109.1800       7.4        41       115        60
OIR    2025250     91400   21.8400 -109.1900       7.4        41       116        60
OIR    2025250     91400   21.8400 -109.2000       7.4        41       116        60
OIR    2025250     91400   21.8400 -109.2100       7.3        41       116        60
OIR    2025250     91400   21.8400 -109.2200       7.3        41       115        60
OIR    2025250     91400   21.8400 -109.2300       7.3        41       113        60
OIR    2025250     91400   21.8400 -109.2400       7.3        41       115        60
OIR    2025250     91400   21.8400 -109.2500       7.3        41       116        60
OIR    2025250     91400   21.8400 -109.2600       7.3        41       115        60
OIR    2025250     91400   21.8400 -109.2700       7.3        41       114        60
OIR    2025250     91400   21.8400 -109.2800       7.2        41       113        60
OIR    2025250     91400   21.8400 -109.2900       7.2        41       113        60
OIR    2025250     91400   21.8400 -109.3000       7.2        41       114        60
OIR    2025250     91400   21.8400 -109.3100       7.2        41       113        60
OIR    2025250     91400   21.8400 -109.3200       7.2        41       112        60
OIR    2025250     91400   21.8400 -109.3300       7.2        41       112        60
OIR    2025250     91400   21.8400 -109.3400       7.2        41       113        60
OIR    2025250     91400   21.8400 -109.3500       7.2        41       113        60
OIR    2025250     91400   21.8400 -109.3600       7.2        41       114        60
OIR    2025250     91400   21.8400 -109.3700       7.1        41       115        60
OIR    2025250     91400   21.8400 -109.3800       7.1        41       116        60
OIR    2025250     91400   21.8400 -109.3900       7.1        41       114        60
OIR    2025250     91400   21.8400 -109.4000       7.1        41       112        60
OIR    2025250     91400   21.8400 -109.4100       7.1        41       114        60
OIR    2025250     91400   21.8400 -109.4200       7.1        41       116        60
OIR    2025250     91400   21.8400 -109.4300       7.1        41       117        60
OIR    2025250     91400   21.8400 -109.4400       7.1        41       117        60
OIR    2025250     91400   21.8400 -109.4500       7.0        41       117        60
OIR    2025250     91400   21.8400 -109.4600       7.0        40       116        60
OIR    2025250     91400   21.8400 -109.4700       7.0        40       116        60
OIR    2025250     91400   21.8400 -109.4800       7.0        40       115        60
OIR    2025250     91400   21.8400 -109.4900       7.0        40       115        60
OIR    2025250     91400   21.8400 -109.5000       6.9        40       115        60
OIR    2025250     91400   21.8400 -109.5100       6.9        40       116        60
OIR    2025250     91400   21.8400 -109.5200       6.9        40       116        60
OIR    2025250     91400   21.8400 -109.5300       6.9        40       116        60
OIR    2025250     91400   21.8400 -109.5400       6.9        40       116        60
OIR    2025250     91400   21.8400 -109.5500       6.8        40       116        60
OIR    2025250     91400   21.8400 -109.5600       6.8        40       116        60
OIR    2025250     91400   21.8400 -109.5700       6.8        40       117        60
OIR    2025250     91400   21.8400 -109.5800       6.7        40       119        60
OIR    2025250     91400   21.8400 -109.5900       6.7        40       120        60
OIR    2025250     91400   21.8400 -109.6000       6.7        40       120        60
OIR    2025250     91400   21.8400 -109.6100       6.6        40       121        60
OIR    2025250     91400   21.8400 -109.6200       6.4        40       121        60
OIR    2025250     91400   21.8400 -109.6300       6.0        40       122        60
OIR    2025250     91400   21.8400 -109.6400       5.0        41       122        60
OIR    2025250     91400   21.8400 -109.6500       4.1        44       123        60
OIR    2025250     91400   21.8300 -108.6100       7.7        40       107        60
OIR    2025250     91400   21.8300 -108.6200       7.7        40       105        60
OIR    2025250     91400   21.8300 -108.6300       7.7        40       107        60
OIR    2025250     91400   21.8300 -108.6400       7.7        40       107        60
OIR    2025250     91400   21.8300 -108.6500       7.7        40       108        60
OIR    2025250     91400   21.8300 -108.6600       7.7        40       108        60
OIR    2025250     91400   21.8300 -108.6700       7.7        40       108        60
OIR    2025250     91400   21.8300 -108.6800       7.7        40       108        60
OIR    2025250     91400   21.8300 -108.6900       7.6        40       109        60
OIR    2025250     91400   21.8300 -108.7000       7.6        40       111        60
OIR    2025250     91400   21.8300 -108.7100       7.6        40       111        60
OIR    2025250     91400   21.8300 -108.7200       7.6        40       111        60
OIR    2025250     91400   21.8300 -108.7300       7.6        40       111        60
OIR    2025250     91400   21.8300 -108.7400       7.6        40       111        60
OIR    2025250     91400   21.8300 -108.7500       7.6        40       111        60
OIR    2025250     91400   21.8300 -108.7600       7.6        40       111        60
OIR    2025250     91400   21.8300 -108.7700       7.6        40       110        60
OIR    2025250     91400   21.8300 -108.7800       7.6        40       109        60
OIR    2025250     91400   21.8300 -108.7900       7.6        40       109        60
OIR    2025250     91400   21.8300 -108.8000       7.6        40       110        60
OIR    2025250     91400   21.8300 -108.8100       7.6        40       110        60
OIR    2025250     91400   21.8300 -108.8200       7.6        40       110        60
OIR    2025250     91400   21.8300 -108.8300       7.6        40       110        60
OIR    2025250     91400   21.8300 -108.8400       7.6        40       111        60
OIR    2025250     91400   21.8300 -108.8500       7.6        40       112        60
OIR    2025250     91400   21.8300 -108.8600       7.6        40       113        60
OIR    2025250     91400   21.8300 -108.8700       7.6        40       114        60
OIR    2025250     91400   21.8300 -108.8800       7.6        40       114        60
OIR    2025250     91400   21.8300 -108.8900       7.6        40       113        60
OIR    2025250     91400   21.8300 -108.9000       7.5        40       113        60
OIR    2025250     91400   21.8300 -108.9100       7.5        40       113        60
OIR    2025250     91400   21.8300 -108.9200       7.5        40       114        60
OIR    2025250     91400   21.8300 -108.9300       7.5        40       114        60
OIR    2025250     91400   21.8300 -108.9400       7.5        40       115        60
OIR    2025250     91400   21.8300 -108.9500       7.5        41       116        60
OIR    2025250     91400   21.8300 -108.9600       7.5        41       116        60
OIR    2025250     91400   21.8300 -108.9700       7.5        41       116        60
OIR    2025250     91400   21.8300 -108.9800       7.5        41       116        60
OIR    2025250     91400   21.8300 -108.9900       7.5        41       114        60
OIR    2025250     91400   21.8300 -109.0000       7.5        41       113        60
OIR    2025250     91400   21.8300 -109.0100       7.5        41       112        60
OIR    2025250     91400   21.8300 -109.0200       7.5        41       112        60
OIR    2025250     91400   21.8300 -109.0300       7.5        41       111        60
OIR    2025250     91400   21.8300 -109.0400       7.5        41       111        60
OIR    2025250     91400   21.8300 -109.0500       7.5        41       112        60
OIR    2025250     91400   21.8300 -109.0600       7.5        41       112        60
OIR    2025250     91400   21.8300 -109.0700       7.4        41       111        60
OIR    2025250     91400   21.8300 -109.0800       7.4        41       111        60
OIR    2025250     91400   21.8300 -109.0900       7.4        41       111        60
OIR    2025250     91400   21.8300 -109.1000       7.4        41       111        60
OIR    2025250     91400   21.8300 -109.1100       7.4        41       112        60
OIR    2025250     91400   21.8300 -109.1200       7.4        41       111        60
OIR    2025250     91400   21.8300 -109.1300       7.4        41       111        60
OIR    2025250     91400   21.8300 -109.1400       7.4        41       112        60
OIR    2025250     91400   21.8300 -109.1500       7.4        41       112        60
OIR    2025250     91400   21.8300 -109.1600       7.4        41       112        60
OIR    2025250     91400   21.8300 -109.1700       7.4        41       113        60
OIR    2025250     91400   21.8300 -109.1800       7.4        41       115        60
OIR    2025250     91400   21.8300 -109.1900       7.4        41       116        60
OIR    2025250     91400   21.8300 -109.2000       7.4        41       117        60
OIR    2025250     91400   21.8300 -109.2100       7.4        41       117        60
OIR    2025250     91400   21.8300 -109.2200       7.3        41       116        60
OIR    2025250     91400   21.8300 -109.2300       7.3        41       115        60
OIR    2025250     91400   21.8300 -109.2400       7.3        41       115        60
OIR    2025250     91400   21.8300 -109.2500       7.3        41       115        60
OIR    2025250     91400   21.8300 -109.2600       7.3        41       115        60
OIR    2025250     91400   21.8300 -109.2700       7.3        41       114        60
OIR    2025250     91400   21.8300 -109.2800       7.2        41       113        60
OIR    2025250     91400   21.8300 -109.2900       7.2        41       114        60
OIR    2025250     91400   21.8300 -109.3000       7.2        41       114        60
OIR    2025250     91400   21.8300 -109.3100       7.2        41       114        60
OIR    2025250     91400   21.8300 -109.3200       7.2        41       113        60
OIR    2025250     91400   21.8300 -109.3300       7.2        41       112        60
OIR    2025250     91400   21.8300 -109.3400       7.2        41       113        60
OIR    2025250     91400   21.8300 -109.3500       7.2        41       114        60
OIR    2025250     91400   21.8300 -109.3600       7.2        41       115        60
OIR    2025250     91400   21.8300 -109.3700       7.1        41       115        60
OIR    2025250     91400   21.8300 -109.3800       7.1        41       116        60
OIR    2025250     91400   21.8300 -109.3900       7.1        41       114        60
OIR    2025250     91400   21.8300 -109.4000       7.1        41       113        60
OIR    2025250     91400   21.8300 -109.4100       7.1        41       113        60
OIR    2025250     91400   21.8300 -109.4200       7.1        41       116        60
OIR    2025250     91400   21.8300 -109.4300       7.1        41       117        60
OIR    2025250     91400   21.8300 -109.4400       7.0        41       117        60
OIR    2025250     91400   21.8300 -109.4500       7.0        41       117        60
OIR    2025250     91400   21.8300 -109.4600       7.0        41       116        60
OIR    2025250     91400   21.8300 -109.4700       7.0        40       116        60
OIR    2025250     91400   21.8300 -109.4800       7.0        40       114        60
OIR    2025250     91400   21.8300 -109.4900       7.0        40       113        60
OIR    2025250     91400   21.8300 -109.5000       6.9        40       113        60
OIR    2025250     91400   21.8300 -109.5100       6.9        40       113        60
OIR    2025250     91400   21.8300 -109.5200       6.9        40       113        60
OIR    2025250     91400   21.8300 -109.5300       6.9        40       114        60
OIR    2025250     91400   21.8300 -109.5400       6.8        40       114        60
OIR    2025250     91400   21.8300 -109.5500       6.8        40       115        60
OIR    2025250     91400   21.8300 -109.5600       6.8        40       115        60
OIR    2025250     91400   21.8300 -109.5700       6.7        40       115        60
OIR    2025250     91400   21.8300 -109.5800       6.7        40       115        60
OIR    2025250     91400   21.8300 -109.5900       6.7        40       116        60
OIR    2025250     91400   21.8300 -109.6000       6.6        40       117        60
OIR    2025250     91400   21.8300 -109.6100       6.5        40       119        60
OIR    2025250     91400   21.8300 -109.6200       6.4        40       121        60
OIR    2025250     91400   21.8300 -109.6300       5.9        40       122        60
OIR    2025250     91400   21.8300 -109.6400       4.9        41       121        60
OIR    2025250     91400   21.8300 -109.6500       4.1        44       120        60
OIR    2025250     91400   21.8200 -108.6100       7.7        40       105        60
OIR    2025250     91400   21.8200 -108.6200       7.7        40       105        60
OIR    2025250     91400   21.8200 -108.6300       7.7        40       105        60
OIR    2025250     91400   21.8200 -108.6400       7.7        40       105        60
OIR    2025250     91400   21.8200 -108.6500       7.7        40       105        60
OIR    2025250     91400   21.8200 -108.6600       7.7        40       107        60
OIR    2025250     91400   21.8200 -108.6700       7.7        40       107        60
OIR    2025250     91400   21.8200 -108.6800       7.7        40       107        60
OIR    2025250     91400   21.8200 -108.6900       7.7        40       109        60
OIR    2025250     91400   21.8200 -108.7000       7.6        40       111        60
OIR    2025250     91400   21.8200 -108.7100       7.6        40       112        60
OIR    2025250     91400   21.8200 -108.7200       7.6        40       111        60
OIR    2025250     91400   21.8200 -108.7300       7.6        40       110        60
OIR    2025250     91400   21.8200 -108.7400       7.6        40       110        60
OIR    2025250     91400   21.8200 -108.7500       7.6        40       110        60
OIR    2025250     91400   21.8200 -108.7600       7.6        40       110        60
OIR    2025250     91400   21.8200 -108.7700       7.6        40       109        60
OIR    2025250     91400   21.8200 -108.7800       7.6        40       109        60
OIR    2025250     91400   21.8200 -108.7900       7.6        40       109        60
OIR    2025250     91400   21.8200 -108.8000       7.6        40       109        60
OIR    2025250     91400   21.8200 -108.8100       7.6        40       109        60
OIR    2025250     91400   21.8200 -108.8200       7.6        40       109        60
OIR    2025250     91400   21.8200 -108.8300       7.6        40       109        60
OIR    2025250     91400   21.8200 -108.8400       7.6        40       109        60
OIR    2025250     91400   21.8200 -108.8500       7.6        40       110        60
OIR    2025250     91400   21.8200 -108.8600       7.6        40       111        60
OIR    2025250     91400   21.8200 -108.8700       7.6        40       114        60
OIR    2025250     91400   21.8200 -108.8800       7.6        40       116        60
OIR    2025250     91400   21.8200 -108.8900       7.6        40       116        60
OIR    2025250     91400   21.8200 -108.9000       7.6        41       116        60
OIR    2025250     91400   21.8200 -108.9100       7.6        41       115        60
OIR    2025250     91400   21.8200 -108.9200       7.5        41       115        60
OIR    2025250     91400   21.8200 -108.9300       7.5        41       115        60
OIR    2025250     91400   21.8200 -108.9400       7.5        41       115        60
OIR    2025250     91400   21.8200 -108.9500       7.5        41       115        60
OIR    2025250     91400   21.8200 -108.9600       7.5        41       115        60
OIR    2025250     91400   21.8200 -108.9700       7.5        41       115        60
OIR    2025250     91400   21.8200 -108.9800       7.5        41       116        60
OIR    2025250     91400   21.8200 -108.9900       7.5        41       116        60
OIR    2025250     91400   21.8200 -109.0000       7.5        41       115        60
OIR    2025250     91400   21.8200 -109.0100       7.5        41       114        60
OIR    2025250     91400   21.8200 -109.0200       7.5        41       113        60
OIR    2025250     91400   21.8200 -109.0300       7.5        41       112        60
OIR    2025250     91400   21.8200 -109.0400       7.5        41       112        60
OIR    2025250     91400   21.8200 -109.0500       7.5        41       112        60
OIR    2025250     91400   21.8200 -109.0600       7.5        41       112        60
OIR    2025250     91400   21.8200 -109.0700       7.5        41       112        60
OIR    2025250     91400   21.8200 -109.0800       7.5        41       112        60
OIR    2025250     91400   21.8200 -109.0900       7.4        41       112        60
OIR    2025250     91400   21.8200 -109.1000       7.4        41       112        60
OIR    2025250     91400   21.8200 -109.1100       7.4        41       113        60
OIR    2025250     91400   21.8200 -109.1200       7.4        41       112        60
OIR    2025250     91400   21.8200 -109.1300       7.4        41       111        60
OIR    2025250     91400   21.8200 -109.1400       7.4        41       112        60
OIR    2025250     91400   21.8200 -109.1500       7.4        41       112        60
OIR    2025250     91400   21.8200 -109.1600       7.4        41       113        60
OIR    2025250     91400   21.8200 -109.1700       7.4        41       114        60
OIR    2025250     91400   21.8200 -109.1800       7.4        41       114        60
OIR    2025250     91400   21.8200 -109.1900       7.4        41       116        60
OIR    2025250     91400   21.8200 -109.2000       7.4        41       116        60
OIR    2025250     91400   21.8200 -109.2100       7.4        41       117        60
OIR    2025250     91400   21.8200 -109.2200       7.3        41       117        60
OIR    2025250     91400   21.8200 -109.2300       7.3        41       116        60
OIR    2025250     91400   21.8200 -109.2400       7.3        41       116        60
OIR    2025250     91400   21.8200 -109.2500       7.3        41       115        60
OIR    2025250     91400   21.8200 -109.2600       7.3        41       114        60
OIR    2025250     91400   21.8200 -109.2700       7.3        41       113        60
OIR    2025250     91400   21.8200 -109.2800       7.2        41       113        60
OIR    2025250     91400   21.8200 -109.2900       7.2        41       114        60
OIR    2025250     91400   21.8200 -109.3000       7.2        41       115        60
OIR    2025250     91400   21.8200 -109.3100       7.2        41       116        60
OIR    2025250     91400   21.8200 -109.3200       7.2        41       114        60
OIR    2025250     91400   21.8200 -109.3300       7.2        41       113        60
OIR    2025250     91400   21.8200 -109.3400       7.2        41       114        60
OIR    2025250     91400   21.8200 -109.3500       7.2        41       116        60
OIR    2025250     91400   21.8200 -109.3600       7.2        41       116        60
OIR    2025250     91400   21.8200 -109.3700       7.1        41       116        60
OIR    2025250     91400   21.8200 -109.3800       7.1        41       114        60
OIR    2025250     91400   21.8200 -109.3900       7.1        41       114        60
OIR    2025250     91400   21.8200 -109.4000       7.1        41       113        60
OIR    2025250     91400   21.8200 -109.4100       7.1        41       113        60
OIR    2025250     91400   21.8200 -109.4200       7.1        41       115        60
OIR    2025250     91400   21.8200 -109.4300       7.1        41       117        60
OIR    2025250     91400   21.8200 -109.4400       7.0        41       116        60
OIR    2025250     91400   21.8200 -109.4500       7.0        41       116        60
OIR    2025250     91400   21.8200 -109.4600       7.0        41       116        60
OIR    2025250     91400   21.8200 -109.4700       7.0        41       116        60
OIR    2025250     91400   21.8200 -109.4800       6.9        41       116        60
OIR    2025250     91400   21.8200 -109.4900       6.9        41       116        60
OIR    2025250     91400   21.8200 -109.5000       6.9        40       114        60
OIR    2025250     91400   21.8200 -109.5100       6.9        40       113        60
OIR    2025250     91400   21.8200 -109.5200       6.9        40       114        60
OIR    2025250     91400   21.8200 -109.5300       6.8        40       115        60
OIR    2025250     91400   21.8200 -109.5400       6.8        40       115        60
OIR    2025250     91400   21.8200 -109.5500       6.8        40       116        60
OIR    2025250     91400   21.8200 -109.5600       6.7        40       116        60
OIR    2025250     91400   21.8200 -109.5700       6.7        40       116        60
OIR    2025250     91400   21.8200 -109.5800       6.7        40       116        60
OIR    2025250     91400   21.8200 -109.5900       6.6        40       116        60
OIR    2025250     91400   21.8200 -109.6000       6.5        40       116        60
OIR    2025250     91400   21.8200 -109.6100       6.4        40       117        60
OIR    2025250     91400   21.8200 -109.6200       6.2        40       119        60
OIR    2025250     91400   21.8200 -109.6300       5.7        40       120        60
OIR    2025250     91400   21.8200 -109.6400       4.7        42       120        60
OIR    2025250     91400   21.8200 -109.6500       4.0        45       119        60
OIR    2025250     91400   21.8100 -108.6100       7.7        40       105        60
OIR    2025250     91400   21.8100 -108.6200       7.7        40       105        60
OIR    2025250     91400   21.8100 -108.6300       7.7        40       105        60
OIR    2025250     91400   21.8100 -108.6400       7.7        40       105        60
OIR    2025250     91400   21.8100 -108.6500       7.7        40       105        60
OIR    2025250     91400   21.8100 -108.6600       7.7        40       107        60
OIR    2025250     91400   21.8100 -108.6700       7.7        40       107        60
OIR    2025250     91400   21.8100 -108.6800       7.7        40       108        60
OIR    2025250     91400   21.8100 -108.6900       7.6        40       109        60
OIR    2025250     91400   21.8100 -108.7000       7.6        40       110        60
OIR    2025250     91400   21.8100 -108.7100       7.6        40       112        60
OIR    2025250     91400   21.8100 -108.7200       7.6        40       111        60
OIR    2025250     91400   21.8100 -108.7300       7.6        40       110        60
OIR    2025250     91400   21.8100 -108.7400       7.6        40       109        60
OIR    2025250     91400   21.8100 -108.7500       7.6        40       109        60
OIR    2025250     91400   21.8100 -108.7600       7.6        40       109        60
OIR    2025250     91400   21.8100 -108.7700       7.6        40       109        60
OIR    2025250     91400   21.8100 -108.7800       7.6        40       109        60
OIR    2025250     91400   21.8100 -108.7900       7.6        40       109        60
OIR    2025250     91400   21.8100 -108.8000       7.6        40       109        60
OIR    2025250     91400   21.8100 -108.8100       7.6        40       110        60
OIR    2025250     91400   21.8100 -108.8200       7.6        40       110        60
OIR    2025250     91400   21.8100 -108.8300       7.6        40       109        60
OIR    2025250     91400   21.8100 -108.8400       7.6        40       109        60
OIR    2025250     91400   21.8100 -108.8500       7.6        40       110        60
OIR    2025250     91400   21.8100 -108.8600       7.6        40       111        60
OIR    2025250     91400   21.8100 -108.8700       7.6        40       113        60
OIR    2025250     91400   21.8100 -108.8800       7.6        41       115        60
OIR    2025250     91400   21.8100 -108.8900       7.6        41       116        60
OIR    2025250     91400   21.8100 -108.9000       7.6        41       116        60
OIR    2025250     91400   21.8100 -108.9100       7.6        41       116        60
OIR    2025250     91400   21.8100 -108.9200       7.6        41       116        60
OIR    2025250     91400   21.8100 -108.9300       7.6        41       116        60
OIR    2025250     91400   21.8100 -108.9400       7.6        41       115        60
OIR    2025250     91400   21.8100 -108.9500       7.5        41       114        60
OIR    2025250     91400   21.8100 -108.9600       7.5        41       113        60
OIR    2025250     91400   21.8100 -108.9700       7.5        41       114        60
OIR    2025250     91400   21.8100 -108.9800       7.5        41       115        60
OIR    2025250     91400   21.8100 -108.9900       7.5        41       116        60
OIR    2025250     91400   21.8100 -109.0000       7.5        41       116        60
OIR    2025250     91400   21.8100 -109.0100       7.5        41       116        60
OIR    2025250     91400   21.8100 -109.0200       7.5        41       115        60
OIR    2025250     91400   21.8100 -109.0300       7.5        41       113        60
OIR    2025250     91400   21.8100 -109.0400       7.5        41       112        60
OIR    2025250     91400   21.8100 -109.0500       7.5        41       112        60
OIR    2025250     91400   21.8100 -109.0600       7.5        41       112        60
OIR    2025250     91400   21.8100 -109.0700       7.5        41       113        60
OIR    2025250     91400   21.8100 -109.0800       7.5        41       114        60
OIR    2025250     91400   21.8100 -109.0900       7.5        41       114        60
OIR    2025250     91400   21.8100 -109.1000       7.5        41       113        60
OIR    2025250     91400   21.8100 -109.1100       7.4        41       113        60
OIR    2025250     91400   21.8100 -109.1200       7.4        41       112        60
OIR    2025250     91400   21.8100 -109.1300       7.4        41       111        60
OIR    2025250     91400   21.8100 -109.1400       7.4        41       111        60
OIR    2025250     91400   21.8100 -109.1500       7.4        41       112        60
OIR    2025250     91400   21.8100 -109.1600       7.4        41       113        60
OIR    2025250     91400   21.8100 -109.1700       7.4        41       114        60
OIR    2025250     91400   21.8100 -109.1800       7.4        41       115        60
OIR    2025250     91400   21.8100 -109.1900       7.4        41       115        60
OIR    2025250     91400   21.8100 -109.2000       7.4        41       115        60
OIR    2025250     91400   21.8100 -109.2100       7.4        41       115        60
OIR    2025250     91400   21.8100 -109.2200       7.4        41       115        60
OIR    2025250     91400   21.8100 -109.2300       7.3        41       115        60
OIR    2025250     91400   21.8100 -109.2400       7.3        41       115        60
OIR    2025250     91400   21.8100 -109.2500       7.3        41       114        60
OIR    2025250     91400   21.8100 -109.2600       7.3        41       113        60
OIR    2025250     91400   21.8100 -109.2700       7.3        41       113        60
OIR    2025250     91400   21.8100 -109.2800       7.3        41       113        60
OIR    2025250     91400   21.8100 -109.2900       7.2        41       113        60
OIR    2025250     91400   21.8100 -109.3000       7.2        41       114        60
OIR    2025250     91400   21.8100 -109.3100       7.2        41       116        60
OIR    2025250     91400   21.8100 -109.3200       7.2        41       115        60
OIR    2025250     91400   21.8100 -109.3300       7.2        41       114        60
OIR    2025250     91400   21.8100 -109.3400       7.2        41       114        60
OIR    2025250     91400   21.8100 -109.3500       7.2        41       116        60
OIR    2025250     91400   21.8100 -109.3600       7.1        41       117        60
OIR    2025250     91400   21.8100 -109.3700       7.1        41       116        60
OIR    2025250     91400   21.8100 -109.3800       7.1        41       115        60
OIR    2025250     91400   21.8100 -109.3900       7.1        41       114        60
OIR    2025250     91400   21.8100 -109.4000       7.1        41       114        60
OIR    2025250     91400   21.8100 -109.4100       7.1        41       114        60
OIR    2025250     91400   21.8100 -109.4200       7.1        41       116        60
OIR    2025250     91400   21.8100 -109.4300       7.0        41       117        60
OIR    2025250     91400   21.8100 -109.4400       7.0        41       116        60
OIR    2025250     91400   21.8100 -109.4500       7.0        41       116        60
OIR    2025250     91400   21.8100 -109.4600       7.0        41       114        60
OIR    2025250     91400   21.8100 -109.4700       7.0        41       115        60
OIR    2025250     91400   21.8100 -109.4800       6.9        41       116        60
OIR    2025250     91400   21.8100 -109.4900       6.9        41       117        60
OIR    2025250     91400   21.8100 -109.5000       6.9        41       116        60
OIR    2025250     91400   21.8100 -109.5100       6.9        40       114        60
OIR    2025250     91400   21.8100 -109.5200       6.8        40       115        60
OIR    2025250     91400   21.8100 -109.5300       6.8        40       116        60
OIR    2025250     91400   21.8100 -109.5400       6.8        40       116        60
OIR    2025250     91400   21.8100 -109.5500       6.7        40       116        60
OIR    2025250     91400   21.8100 -109.5600       6.7        40       116        60
OIR    2025250     91400   21.8100 -109.5700       6.7        40       116        60
OIR    2025250     91400   21.8100 -109.5800       6.6        40       117        60
OIR    2025250     91400   21.8100 -109.5900       6.5        40       117        60
OIR    2025250     91400   21.8100 -109.6000       6.4        40       116        60
OIR    2025250     91400   21.8100 -109.6100       6.3        40       116        60
OIR    2025250     91400   21.8100 -109.6200       6.0        40       116        60
OIR    2025250     91400   21.8100 -109.6300       5.5        40       117        60
OIR    2025250     91400   21.8100 -109.6400       4.6        43       117        60
OIR    2025250     91400   21.8000 -108.6100       7.7        40       105        60
OIR    2025250     91400   21.8000 -108.6200       7.7        40       105        60
OIR    2025250     91400   21.8000 -108.6300       7.7        40       105        60
OIR    2025250     91400   21.8000 -108.6400       7.7        40       105        60
OIR    2025250     91400   21.8000 -108.6500       7.7        40       105        60
OIR    2025250     91400   21.8000 -108.6600       7.7        40       107        60
OIR    2025250     91400   21.8000 -108.6700       7.7        40       108        60
OIR    2025250     91400   21.8000 -108.6800       7.7        40       109        60
OIR    2025250     91400   21.8000 -108.6900       7.6        40       110        60
OIR    2025250     91400   21.8000 -108.7000       7.6        40       110        60
OIR    2025250     91400   21.8000 -108.7100       7.6        40       111        60
OIR    2025250     91400   21.8000 -108.7200       7.6        40       111        60
OIR    2025250     91400   21.8000 -108.7300       7.6        40       109        60
OIR    2025250     91400   21.8000 -108.7400       7.6        40       108        60
OIR    2025250     91400   21.8000 -108.7500       7.6        40       109        60
OIR    2025250     91400   21.8000 -108.7600       7.6        40       109        60
OIR    2025250     91400   21.8000 -108.7700       7.6        40       109        60
OIR    2025250     91400   21.8000 -108.7800       7.6        40       109        60
OIR    2025250     91400   21.8000 -108.7900       7.6        40       109        60
OIR    2025250     91400   21.8000 -108.8000       7.6        40       110        60
OIR    2025250     91400   21.8000 -108.8100       7.6        40       111        60
OIR    2025250     91400   21.8000 -108.8200       7.6        40       111        60
OIR    2025250     91400   21.8000 -108.8300       7.6        40       111        60
OIR    2025250     91400   21.8000 -108.8400       7.6        40       110        60
OIR    2025250     91400   21.8000 -108.8500       7.6        41       111        60
OIR    2025250     91400   21.8000 -108.8600       7.6        41       112        60
OIR    2025250     91400   21.8000 -108.8700       7.6        41       112        60
OIR    2025250     91400   21.8000 -108.8800       7.6        41       113        60
OIR    2025250     91400   21.8000 -108.8900       7.6        41       114        60
OIR    2025250     91400   21.8000 -108.9000       7.6        41       115        60
OIR    2025250     91400   21.8000 -108.9100       7.6        41       116        60
OIR    2025250     91400   21.8000 -108.9200       7.6        41       115        60
OIR    2025250     91400   21.8000 -108.9300       7.6        41       114        60
OIR    2025250     91400   21.8000 -108.9400       7.6        41       113        60
OIR    2025250     91400   21.8000 -108.9500       7.6        41       112        60
OIR    2025250     91400   21.8000 -108.9600       7.6        41       112        60
OIR    2025250     91400   21.8000 -108.9700       7.6        41       113        60
OIR    2025250     91400   21.8000 -108.9800       7.6        41       114        60
OIR    2025250     91400   21.8000 -108.9900       7.5        41       114        60
OIR    2025250     91400   21.8000 -109.0000       7.5        41       116        60
OIR    2025250     91400   21.8000 -109.0100       7.5        41       116        60
OIR    2025250     91400   21.8000 -109.0200       7.5        41       116        60
OIR    2025250     91400   21.8000 -109.0300       7.5        41       114        60
OIR    2025250     91400   21.8000 -109.0400       7.5        41       112        60
OIR    2025250     91400   21.8000 -109.0500       7.5        41       113        60
OIR    2025250     91400   21.8000 -109.0600       7.5        41       113        60
OIR    2025250     91400   21.8000 -109.0700       7.5        41       114        60
OIR    2025250     91400   21.8000 -109.0800       7.5        41       114        60
OIR    2025250     91400   21.8000 -109.0900       7.5        41       114        60
OIR    2025250     91400   21.8000 -109.1000       7.5        41       113        60
OIR    2025250     91400   21.8000 -109.1100       7.5        41       113        60
OIR    2025250     91400   21.8000 -109.1200       7.5        41       112        60
OIR    2025250     91400   21.8000 -109.1300       7.4        41       111        60
OIR    2025250     91400   21.8000 -109.1400       7.4        41       111        60
OIR    2025250     91400   21.8000 -109.1500       7.4        41       112        60
OIR    2025250     91400   21.8000 -109.1600       7.4        41       113        60
OIR    2025250     91400   21.8000 -109.1700       7.4        41       114        60
OIR    2025250     91400   21.8000 -109.1800       7.4        41       114        60
OIR    2025250     91400   21.8000 -109.1900       7.4        41       115        60
OIR    2025250     91400   21.8000 -109.2000       7.4        41       114        60
OIR    2025250     91400   21.8000 -109.2100       7.4        41       113        60
OIR    2025250     91400   21.8000 -109.2200       7.4        41       113        60
OIR    2025250     91400   21.8000 -109.2300       7.3        41       113        60
OIR    2025250     91400   21.8000 -109.2400       7.3        41       113        60
OIR    2025250     91400   21.8000 -109.2500       7.3        41       113        60
OIR    2025250     91400   21.8000 -109.2600       7.3        41       113        60
OIR    2025250     91400   21.8000 -109.2700       7.3        41       113        60
OIR    2025250     91400   21.8000 -109.2800       7.3        41       112        60
OIR    2025250     91400   21.8000 -109.2900       7.2        41       112        60
OIR    2025250     91400   21.8000 -109.3000       7.2        41       113        60
OIR    2025250     91400   21.8000 -109.3100       7.2        41       114        60
OIR    2025250     91400   21.8000 -109.3200       7.2        41       114        60
OIR    2025250     91400   21.8000 -109.3300       7.2        41       114        60
OIR    2025250     91400   21.8000 -109.3400       7.2        41       115        60
OIR    2025250     91400   21.8000 -109.3500       7.2        41       116        60
OIR    2025250     91400   21.8000 -109.3600       7.1        41       117        60
OIR    2025250     91400   21.8000 -109.3700       7.1        41       117        60
OIR    2025250     91400   21.8000 -109.3800       7.1        41       116        60
OIR    2025250     91400   21.8000 -109.3900       7.1        41       114        60
OIR    2025250     91400   21.8000 -109.4000       7.1        41       115        60
OIR    2025250     91400   21.8000 -109.4100       7.1        41       116        60
OIR    2025250     91400   21.8000 -109.4200       7.1        41       116        60
OIR    2025250     91400   21.8000 -109.4300       7.0        41       117        60
OIR    2025250     91400   21.8000 -109.4400       7.0        41       119        60
OIR    2025250     91400   21.8000 -109.4500       7.0        41       117        60
OIR    2025250     91400   21.8000 -109.4600       7.0        41       116        60
OIR    2025250     91400   21.8000 -109.4700       6.9        41       116        60
OIR    2025250     91400   21.8000 -109.4800       6.9        41       116        60
OIR    2025250     91400   21.8000 -109.4900       6.9        41       116        60
OIR    2025250     91400   21.8000 -109.5000       6.9        41       115        60
OIR    2025250     91400   21.8000 -109.5100       6.8        41       114        60
OIR    2025250     91400   21.8000 -109.5200       6.8        41       114        60
OIR    2025250     91400   21.8000 -109.5300       6.8        40       115        60
OIR    2025250     91400   21.8000 -109.5400       6.7        40       115        60
OIR    2025250     91400   21.8000 -109.5500       6.7        40       116        60
OIR    2025250     91400   21.8000 -109.5600       6.7        40       116        60
OIR    2025250     91400   21.8000 -109.5700       6.6        40       116        60
OIR    2025250     91400   21.8000 -109.5800       6.5        40       116        60
OIR    2025250     91400   21.8000 -109.5900       6.4        40       116        60
OIR    2025250     91400   21.8000 -109.6000       6.3        40       116        60
OIR    2025250     91400   21.8000 -109.6100       6.1        40       116        60
OIR    2025250     91400   21.8000 -109.6200       5.8        40       116        60
OIR    2025250     91400   21.8000 -109.6300       5.3        41       116        60
OIR    2025250     91400   21.8000 -109.6400       4.5        43       116        60
OIR    2025250     91400   21.8000 -110.0400       4.0        55       140        60
OIR    2025250     91400   21.7900 -108.6100       7.7        40       104        60
OIR    2025250     91400   21.7900 -108.6200       7.7        40       104        60
OIR    2025250     91400   21.7900 -108.6300       7.7        40       104        60
OIR    2025250     91400   21.7900 -108.6400       7.7        40       104        60
OIR    2025250     91400   21.7900 -108.6500       7.7        40       104        60
OIR    2025250     91400   21.7900 -108.6600       7.7        40       104        60
OIR    2025250     91400   21.7900 -108.6700       7.7        40       104        60
OIR    2025250     91400   21.7900 -108.6800       7.6        40       105        60
OIR    2025250     91400   21.7900 -108.6900       7.6        40       107        60
OIR    2025250     91400   21.7900 -108.7000       7.6        40       108        60
OIR    2025250     91400   21.7900 -108.7100       7.6        40       108        60
OIR    2025250     91400   21.7900 -108.7200       7.6        40       108        60
OIR    2025250     91400   21.7900 -108.7300       7.6        40       107        60
OIR    2025250     91400   21.7900 -108.7400       7.6        40       105        60
OIR    2025250     91400   21.7900 -108.7500       7.6        40       107        60
OIR    2025250     91400   21.7900 -108.7600       7.6        40       107        60
OIR    2025250     91400   21.7900 -108.7700       7.6        40       108        60
OIR    2025250     91400   21.7900 -108.7800       7.6        40       108        60
OIR    2025250     91400   21.7900 -108.7900       7.6        40       108        60
OIR    2025250     91400   21.7900 -108.8000       7.6        41       108        60
OIR    2025250     91400   21.7900 -108.8100       7.6        41       109        60
OIR    2025250     91400   21.7900 -108.8200       7.6        41       110        60
OIR    2025250     91400   21.7900 -108.8300       7.6        41       110        60
OIR    2025250     91400   21.7900 -108.8400       7.6        41       110        60
OIR    2025250     91400   21.7900 -108.8500       7.6        41       110        60
OIR    2025250     91400   21.7900 -108.8600       7.6        41       111        60
OIR    2025250     91400   21.7900 -108.8700       7.6        41       111        60
OIR    2025250     91400   21.7900 -108.8800       7.6        41       112        60
OIR    2025250     91400   21.7900 -108.8900       7.6        41       112        60
OIR    2025250     91400   21.7900 -108.9000       7.6        41       113        60
OIR    2025250     91400   21.7900 -108.9100       7.6        41       114        60
OIR    2025250     91400   21.7900 -108.9200       7.6        41       114        60
OIR    2025250     91400   21.7900 -108.9300       7.6        41       112        60
OIR    2025250     91400   21.7900 -108.9400       7.6        41       110        60
OIR    2025250     91400   21.7900 -108.9500       7.6        41       110        60
OIR    2025250     91400   21.7900 -108.9600       7.6        41       111        60
OIR    2025250     91400   21.7900 -108.9700       7.6        41       112        60
OIR    2025250     91400   21.7900 -108.9800       7.6        41       112        60
OIR    2025250     91400   21.7900 -108.9900       7.6        41       113        60
OIR    2025250     91400   21.7900 -109.0000       7.5        41       114        60
OIR    2025250     91400   21.7900 -109.0100       7.5        41       116        60
OIR    2025250     91400   21.7900 -109.0200       7.5        41       116        60
OIR    2025250     91400   21.7900 -109.0300       7.5        41       114        60
OIR    2025250     91400   21.7900 -109.0400       7.5        41       113        60
OIR    2025250     91400   21.7900 -109.0500       7.5        41       114        60
OIR    2025250     91400   21.7900 -109.0600       7.5        41       115        60
OIR    2025250     91400   21.7900 -109.0700       7.5        41       116        60
OIR    2025250     91400   21.7900 -109.0800       7.5        41       114        60
OIR    2025250     91400   21.7900 -109.0900       7.5        41       112        60
OIR    2025250     91400   21.7900 -109.1000       7.5        41       112        60
OIR    2025250     91400   21.7900 -109.1100       7.5        41       112        60
OIR    2025250     91400   21.7900 -109.1200       7.5        41       112        60
OIR    2025250     91400   21.7900 -109.1300       7.5        41       111        60
OIR    2025250     91400   21.7900 -109.1400       7.4        41       111        60
OIR    2025250     91400   21.7900 -109.1500       7.4        41       111        60
OIR    2025250     91400   21.7900 -109.1600       7.4        41       112        60
OIR    2025250     91400   21.7900 -109.1700       7.4        41       112        60
OIR    2025250     91400   21.7900 -109.1800       7.4        41       113        60
OIR    2025250     91400   21.7900 -109.1900       7.4        41       114        60
OIR    2025250     91400   21.7900 -109.2000       7.4        41       114        60
OIR    2025250     91400   21.7900 -109.2100       7.4        41       113        60
OIR    2025250     91400   21.7900 -109.2200       7.4        41       113        60
OIR    2025250     91400   21.7900 -109.2300       7.3        41       115        60
OIR    2025250     91400   21.7900 -109.2400       7.3        41       116        60
OIR    2025250     91400   21.7900 -109.2500       7.3        41       115        60
OIR    2025250     91400   21.7900 -109.2600       7.3        41       114        60
OIR    2025250     91400   21.7900 -109.2700       7.3        41       113        60
OIR    2025250     91400   21.7900 -109.2800       7.3        41       113        60
OIR    2025250     91400   21.7900 -109.2900       7.2        41       112        60
OIR    2025250     91400   21.7900 -109.3000       7.2        41       113        60
OIR    2025250     91400   21.7900 -109.3100       7.2        41       114        60
OIR    2025250     91400   21.7900 -109.3200       7.2        41       114        60
OIR    2025250     91400   21.7900 -109.3300       7.2        41       114        60
OIR    2025250     91400   21.7900 -109.3400       7.2        41       114        60
OIR    2025250     91400   21.7900 -109.3500       7.2        41       115        60
OIR    2025250     91400   21.7900 -109.3600       7.1        41       116        60
OIR    2025250     91400   21.7900 -109.3700       7.1        41       116        60
OIR    2025250     91400   21.7900 -109.3800       7.1        41       116        60
OIR    2025250     91400   21.7900 -109.3900       7.1        41       115        60
OIR    2025250     91400   21.7900 -109.4000       7.1        41       115        60
OIR    2025250     91400   21.7900 -109.4100       7.1        41       116        60
OIR    2025250     91400   21.7900 -109.4200       7.1        41       116        60
OIR    2025250     91400   21.7900 -109.4300       7.0        41       119        60
OIR    2025250     91400   21.7900 -109.4400       7.0        41       120        60
OIR    2025250     91400   21.7900 -109.4500       7.0        41       119        60
OIR    2025250     91400   21.7900 -109.4600       7.0        41       117        60
OIR    2025250     91400   21.7900 -109.4700       6.9        41       116        60
OIR    2025250     91400   21.7900 -109.4800       6.9        41       115        60
OIR    2025250     91400   21.7900 -109.4900       6.9        41       114        60
OIR    2025250     91400   21.7900 -109.5000       6.8        41       114        60
OIR    2025250     91400   21.7900 -109.5100       6.8        41       114        60
OIR    2025250     91400   21.7900 -109.5200       6.8        41       114        60
OIR    2025250     91400   21.7900 -109.5300       6.7        41       114        60
OIR    2025250     91400   21.7900 -109.5400       6.7        40       113        60
OIR    2025250     91400   21.7900 -109.5500       6.6        40       114        60
OIR    2025250     91400   21.7900 -109.5600       6.6        40       116        60
OIR    2025250     91400   21.7900 -109.5700       6.5        40       115        60
OIR    2025250     91400   21.7900 -109.5800       6.4        40       114        60
OIR    2025250     91400   21.7900 -109.5900       6.3        40       113        60
OIR    2025250     91400   21.7900 -109.6000       6.1        40       114        60
OIR    2025250     91400   21.7900 -109.6100       5.9        40       115        60
OIR    2025250     91400   21.7900 -109.6200       5.5        40       115        60
OIR    2025250     91400   21.7900 -109.6300       5.0        41       115        60
OIR    2025250     91400   21.7900 -109.6400       4.4        43       115        60
OIR    2025250     91400   21.7900 -110.0400       4.0        55       139        60
OIR    2025250     91400   21.7900 -110.0800       4.1        57       139        60
OIR    2025250     91400   21.7900 -110.0900       4.2        57       139        60
OIR    2025250     91400   21.7900 -114.7600      17.3       134       151        60
OIR    2025250     91400   21.7900 -114.7700      17.3       134       114        60
OIR    2025250     91400   21.7900 -114.7800      17.3       134       147        60
OIR    2025250     91400   21.7800 -108.6100       7.7        40       104        60
OIR    2025250     91400   21.7800 -108.6200       7.7        40       103        60
OIR    2025250     91400   21.7800 -108.6300       7.7        40       103        60
OIR    2025250     91400   21.7800 -108.6400       7.7        40       103        60
OIR    2025250     91400   21.7800 -108.6500       7.7        40       103        60
OIR    2025250     91400   21.7800 -108.6600       7.7        40       103        60
OIR    2025250     91400   21.7800 -108.6700       7.7        40       103        60
OIR    2025250     91400   21.7800 -108.6800       7.7        40       104        60
OIR    2025250     91400   21.7800 -108.6900       7.6        40       104        60
OIR    2025250     91400   21.7800 -108.7000       7.6        40       104        60
OIR    2025250     91400   21.7800 -108.7100       7.6        40       105        60
OIR    2025250     91400   21.7800 -108.7200       7.6        40       105        60
OIR    2025250     91400   21.7800 -108.7300       7.6        40       104        60
OIR    2025250     91400   21.7800 -108.7400       7.6        40       104        60
OIR    2025250     91400   21.7800 -108.7500       7.6        40       104        60
OIR    2025250     91400   21.7800 -108.7600       7.6        40       104        60
OIR    2025250     91400   21.7800 -108.7700       7.6        41       105        60
OIR    2025250     91400   21.7800 -108.7800       7.6        41       105        60
OIR    2025250     91400   21.7800 -108.7900       7.6        41       105        60
OIR    2025250     91400   21.7800 -108.8000       7.6        41       107        60
OIR    2025250     91400   21.7800 -108.8100       7.6        41       107        60
OIR    2025250     91400   21.7800 -108.8200       7.6        41       107        60
OIR    2025250     91400   21.7800 -108.8300       7.6        41       108        60
OIR    2025250     91400   21.7800 -108.8400       7.6        41       108        60
OIR    2025250     91400   21.7800 -108.8500       7.6        41       108        60
OIR    2025250     91400   21.7800 -108.8600       7.6        41       108        60
OIR    2025250     91400   21.7800 -108.8700       7.6        41       108        60
OIR    2025250     91400   21.7800 -108.8800       7.6        41       108        60
OIR    2025250     91400   21.7800 -108.8900       7.6        41       109        60
OIR    2025250     91400   21.7800 -108.9000       7.6        41       109        60
OIR    2025250     91400   21.7800 -108.9100       7.6        41       110        60
OIR    2025250     91400   21.7800 -108.9200       7.6        41       111        60
OIR    2025250     91400   21.7800 -108.9300       7.6        41       110        60
OIR    2025250     91400   21.7800 -108.9400       7.6        41       110        60
OIR    2025250     91400   21.7800 -108.9500       7.6        41       110        60
OIR    2025250     91400   21.7800 -108.9600       7.6        41       110        60
OIR    2025250     91400   21.7800 -108.9700       7.6        41       111        60
OIR    2025250     91400   21.7800 -108.9800       7.6        41       111        60
OIR    2025250     91400   21.7800 -108.9900       7.6        41       111        60
OIR    2025250     91400   21.7800 -109.0000       7.6        41       112        60
OIR    2025250     91400   21.7800 -109.0100       7.5        41       113        60
OIR    2025250     91400   21.7800 -109.0200       7.5        41       114        60
OIR    2025250     91400   21.7800 -109.0300       7.5        41       113        60
OIR    2025250     91400   21.7800 -109.0400       7.5        41       112        60
OIR    2025250     91400   21.7800 -109.0500       7.5        41       112        60
OIR    2025250     91400   21.7800 -109.0600       7.5        41       113        60
OIR    2025250     91400   21.7800 -109.0700       7.5        41       114        60
OIR    2025250     91400   21.7800 -109.0800       7.5        41       113        60
OIR    2025250     91400   21.7800 -109.0900       7.5        41       111        60
OIR    2025250     91400   21.7800 -109.1000       7.5        41       111        60
OIR    2025250     91400   21.7800 -109.1100       7.5        41       111        60
OIR    2025250     91400   21.7800 -109.1200       7.5        41       111        60
OIR    2025250     91400   21.7800 -109.1300       7.5        41       111        60
OIR    2025250     91400   21.7800 -109.1400       7.5        41       111        60
OIR    2025250     91400   21.7800 -109.1500       7.4        41       111        60
OIR    2025250     91400   21.7800 -109.1600       7.4        41       111        60
OIR    2025250     91400   21.7800 -109.1700       7.4        41       111        60
OIR    2025250     91400   21.7800 -109.1800       7.4        41       112        60
OIR    2025250     91400   21.7800 -109.1900       7.4        41       112        60
OIR    2025250     91400   21.7800 -109.2000       7.4        41       113        60
OIR    2025250     91400   21.7800 -109.2100       7.4        41       113        60
OIR    2025250     91400   21.7800 -109.2200       7.4        42       113        60
OIR    2025250     91400   21.7800 -109.2300       7.3        42       115        60
OIR    2025250     91400   21.7800 -109.2400       7.3        42       117        60
OIR    2025250     91400   21.7800 -109.2500       7.3        42       117        60
OIR    2025250     91400   21.7800 -109.2600       7.3        42       116        60
OIR    2025250     91400   21.7800 -109.2700       7.3        41       115        60
OIR    2025250     91400   21.7800 -109.2800       7.3        41       114        60
OIR    2025250     91400   21.7800 -109.2900       7.3        41       114        60
OIR    2025250     91400   21.7800 -109.3000       7.2        41       114        60
OIR    2025250     91400   21.7800 -109.3100       7.2        41       114        60
OIR    2025250     91400   21.7800 -109.3200       7.2        41       115        60
OIR    2025250     91400   21.7800 -109.3300       7.2        41       115        60
OIR    2025250     91400   21.7800 -109.3400       7.2        41       114        60
OIR    2025250     91400   21.7800 -109.3500       7.2        41       114        60
OIR    2025250     91400   21.7800 -109.3600       7.2        41       114        60
OIR    2025250     91400   21.7800 -109.3700       7.1        41       114        60
OIR    2025250     91400   21.7800 -109.3800       7.1        41       115        60
OIR    2025250     91400   21.7800 -109.3900       7.1        41       115        60
OIR    2025250     91400   21.7800 -109.4000       7.1        41       115        60
OIR    2025250     91400   21.7800 -109.4100       7.1        41       115        60
OIR    2025250     91400   21.7800 -109.4200       7.0        41       115        60
OIR    2025250     91400   21.7800 -109.4300       7.0        41       116        60
OIR    2025250     91400   21.7800 -109.4400       7.0        41       117        60
OIR    2025250     91400   21.7800 -109.4500       7.0        41       117        60
OIR    2025250     91400   21.7800 -109.4600       6.9        41       116        60
OIR    2025250     91400   21.7800 -109.4700       6.9        41       115        60
OIR    2025250     91400   21.7800 -109.4800       6.9        41       115        60
OIR    2025250     91400   21.7800 -109.4900       6.8        41       114        60
OIR    2025250     91400   21.7800 -109.5000       6.8        41       113        60
OIR    2025250     91400   21.7800 -109.5100       6.7        41       113        60
OIR    2025250     91400   21.7800 -109.5200       6.7        41       113        60
OIR    2025250     91400   21.7800 -109.5300       6.7        41       113        60
OIR    2025250     91400   21.7800 -109.5400       6.6        41       113        60
OIR    2025250     91400   21.7800 -109.5500       6.5        40       113        60
OIR    2025250     91400   21.7800 -109.5600       6.5        40       114        60
OIR    2025250     91400   21.7800 -109.5700       6.4        40       114        60
OIR    2025250     91400   21.7800 -109.5800       6.3        40       113        60
OIR    2025250     91400   21.7800 -109.5900       6.2        40       112        60
OIR    2025250     91400   21.7800 -109.6000       6.0        40       112        60
OIR    2025250     91400   21.7800 -109.6100       5.7        40       112        60
OIR    2025250     91400   21.7800 -109.6200       5.3        41       113        60
OIR    2025250     91400   21.7800 -109.6300       4.8        42       113        60
OIR    2025250     91400   21.7800 -109.6400       4.3        43       113        60
OIR    2025250     91400   21.7800 -110.0400       4.0        56       138        60
OIR    2025250     91400   21.7800 -110.0500       4.0        56       139        60
OIR    2025250     91400   21.7700 -108.6100       7.7        41       104        60
OIR    2025250     91400   21.7700 -108.6200       7.7        41       103        60
OIR    2025250     91400   21.7700 -108.6300       7.7        41       103        60
OIR    2025250     91400   21.7700 -108.6400       7.7        41       103        60
OIR    2025250     91400   21.7700 -108.6500       7.7        41       103        60
OIR    2025250     91400   21.7700 -108.6600       7.7        41       103        60
OIR    2025250     91400   21.7700 -108.6700       7.6        41       103        60
OIR    2025250     91400   21.7700 -108.6800       7.6        40       104        60
OIR    2025250     91400   21.7700 -108.6900       7.6        40       104        60
OIR    2025250     91400   21.7700 -108.7000       7.6        40       105        60
OIR    2025250     91400   21.7700 -108.7100       7.6        40       105        60
OIR    2025250     91400   21.7700 -108.7200       7.6        40       105        60
OIR    2025250     91400   21.7700 -108.7300       7.6        41       104        60
OIR    2025250     91400   21.7700 -108.7400       7.6        41       104        60
OIR    2025250     91400   21.7700 -108.7500       7.6        41       103        60
OIR    2025250     91400   21.7700 -108.7600       7.6        41       104        60
OIR    2025250     91400   21.7700 -108.7700       7.6        41       104        60
OIR    2025250     91400   21.7700 -108.7800       7.6        41       104        60
OIR    2025250     91400   21.7700 -108.7900       7.6        41       104        60
OIR    2025250     91400   21.7700 -108.8000       7.6        41       105        60
OIR    2025250     91400   21.7700 -108.8100       7.6        41       105        60
OIR    2025250     91400   21.7700 -108.8200       7.6        41       105        60
OIR    2025250     91400   21.7700 -108.8300       7.6        41       105        60
OIR    2025250     91400   21.7700 -108.8400       7.6        41       107        60
OIR    2025250     91400   21.7700 -108.8500       7.6        41       107        60
OIR    2025250     91400   21.7700 -108.8600       7.6        41       105        60
OIR    2025250     91400   21.7700 -108.8700       7.6        41       105        60
OIR    2025250     91400   21.7700 -108.8800       7.6        41       105        60
OIR    2025250     91400   21.7700 -108.8900       7.6        41       105        60
OIR    2025250     91400   21.7700 -108.9000       7.6        41       107        60
OIR    2025250     91400   21.7700 -108.9100       7.6        41       108        60
OIR    2025250     91400   21.7700 -108.9200       7.6        41       108        60
OIR    2025250     91400   21.7700 -108.9300       7.6        41       108        60
OIR    2025250     91400   21.7700 -108.9400       7.6        41       109        60
OIR    2025250     91400   21.7700 -108.9500       7.6        41       109        60
OIR    2025250     91400   21.7700 -108.9600       7.6        41       110        60
OIR    2025250     91400   21.7700 -108.9700       7.6        41       110        60
OIR    2025250     91400   21.7700 -108.9800       7.6        41       110        60
OIR    2025250     91400   21.7700 -108.9900       7.6        41       110        60
OIR    2025250     91400   21.7700 -109.0000       7.6        41       109        60
OIR    2025250     91400   21.7700 -109.0100       7.6        41       110        60
OIR    2025250     91400   21.7700 -109.0200       7.5        41       110        60
OIR    2025250     91400   21.7700 -109.0300       7.5        41       110        60
OIR    2025250     91400   21.7700 -109.0400       7.5        41       110        60
OIR    2025250     91400   21.7700 -109.0500       7.5        41       110        60
OIR    2025250     91400   21.7700 -109.0600       7.5        41       110        60
OIR    2025250     91400   21.7700 -109.0700       7.5        41       111        60
OIR    2025250     91400   21.7700 -109.0800       7.5        41       110        60
OIR    2025250     91400   21.7700 -109.0900       7.5        41       109        60
OIR    2025250     91400   21.7700 -109.1000       7.5        41       108        60
OIR    2025250     91400   21.7700 -109.1100       7.5        41       109        60
OIR    2025250     91400   21.7700 -109.1200       7.5        41       109        60
OIR    2025250     91400   21.7700 -109.1300       7.5        41       110        60
OIR    2025250     91400   21.7700 -109.1400       7.5        41       110        60
OIR    2025250     91400   21.7700 -109.1500       7.5        41       110        60
OIR    2025250     91400   21.7700 -109.1600       7.4        41       109        60
OIR    2025250     91400   21.7700 -109.1700       7.4        41       109        60
OIR    2025250     91400   21.7700 -109.1800       7.4        41       110        60
OIR    2025250     91400   21.7700 -109.1900       7.4        42       110        60
OIR    2025250     91400   21.7700 -109.2000       7.4        42       111        60
OIR    2025250     91400   21.7700 -109.2100       7.4        42       111        60
OIR    2025250     91400   21.7700 -109.2200       7.4        42       112        60
OIR    2025250     91400   21.7700 -109.2300       7.3        42       113        60
OIR    2025250     91400   21.7700 -109.2400       7.3        42       114        60
OIR    2025250     91400   21.7700 -109.2500       7.3        42       115        60
OIR    2025250     91400   21.7700 -109.2600       7.3        42       115        60
OIR    2025250     91400   21.7700 -109.2700       7.3        42       114        60
OIR    2025250     91400   21.7700 -109.2800       7.3        42       114        60
OIR    2025250     91400   21.7700 -109.2900       7.3        42       114        60
OIR    2025250     91400   21.7700 -109.3000       7.2        42       114        60
OIR    2025250     91400   21.7700 -109.3100       7.2        42       114        60
OIR    2025250     91400   21.7700 -109.3200       7.2        42       114        60
OIR    2025250     91400   21.7700 -109.3300       7.2        42       114        60
OIR    2025250     91400   21.7700 -109.3400       7.2        42       113        60
OIR    2025250     91400   21.7700 -109.3500       7.2        42       113        60
OIR    2025250     91400   21.7700 -109.3600       7.2        41       113        60
OIR    2025250     91400   21.7700 -109.3700       7.1        41       112        60
OIR    2025250     91400   21.7700 -109.3800       7.1        41       113        60
OIR    2025250     91400   21.7700 -109.3900       7.1        41       115        60
OIR    2025250     91400   21.7700 -109.4000       7.1        41       115        60
OIR    2025250     91400   21.7700 -109.4100       7.1        41       114        60
OIR    2025250     91400   21.7700 -109.4200       7.0        41       113        60
OIR    2025250     91400   21.7700 -109.4300       7.0        41       114        60
OIR    2025250     91400   21.7700 -109.4400       7.0        41       116        60
OIR    2025250     91400   21.7700 -109.4500       7.0        41       116        60
OIR    2025250     91400   21.7700 -109.4600       6.9        41       115        60
OIR    2025250     91400   21.7700 -109.4700       6.9        41       114        60
OIR    2025250     91400   21.7700 -109.4800       6.8        41       113        60
OIR    2025250     91400   21.7700 -109.4900       6.8        41       113        60
OIR    2025250     91400   21.7700 -109.5000       6.7        41       113        60
OIR    2025250     91400   21.7700 -109.5100       6.7        41       113        60
OIR    2025250     91400   21.7700 -109.5200       6.7        41       112        60
OIR    2025250     91400   21.7700 -109.5300       6.6        41       112        60
OIR    2025250     91400   21.7700 -109.5400       6.5        41       113        60
OIR    2025250     91400   21.7700 -109.5500       6.4        41       113        60
OIR    2025250     91400   21.7700 -109.5600       6.3        41       112        60
OIR    2025250     91400   21.7700 -109.5700       6.2        40       111        60
OIR    2025250     91400   21.7700 -109.5800       6.1        40       111        60
OIR    2025250     91400   21.7700 -109.5900       6.0        40       110        60
OIR    2025250     91400   21.7700 -109.6000       5.8        40       110        60
OIR    2025250     91400   21.7700 -109.6100       5.4        41       110        60
OIR    2025250     91400   21.7700 -109.6200       5.0        42       111        60
OIR    2025250     91400   21.7700 -109.6300       4.5        43       111        60
OIR    2025250     91400   21.7700 -109.6400       4.1        44       110        60
OIR    2025250     91400   21.7700 -110.0400       4.0        56       138        60
OIR    2025250     91400   21.7700 -110.0500       4.0        56       138        60
OIR    2025250     91400   21.7700 -110.0600       4.1        57       138        60
OIR    2025250     91400   21.7700 -110.0700       4.1        57       140        60
OIR    2025250     91400   21.7700 -114.8900      17.2       134       150        60
OIR    2025250     91400   21.7700 -117.3800      12.1       145       144        60
OIR    2025250     91400   21.7600 -108.6100       7.7        41       104        60
OIR    2025250     91400   21.7600 -108.6200       7.7        41       104        60
OIR    2025250     91400   21.7600 -108.6300       7.7        41       103        60
OIR    2025250     91400   21.7600 -108.6400       7.7        41       103        60
OIR    2025250     91400   21.7600 -108.6500       7.7        41       103        60
OIR    2025250     91400   21.7600 -108.6600       7.7        41       103        60
OIR    2025250     91400   21.7600 -108.6700       7.7        41       103        60
OIR    2025250     91400   21.7600 -108.6800       7.6        41       104        60
OIR    2025250     91400   21.7600 -108.6900       7.6        41       104        60
OIR    2025250     91400   21.7600 -108.7000       7.6        41       107        60
OIR    2025250     91400   21.7600 -108.7100       7.6        41       107        60
OIR    2025250     91400   21.7600 -108.7200       7.6        41       107        60
OIR    2025250     91400   21.7600 -108.7300       7.6        41       105        60
OIR    2025250     91400   21.7600 -108.7400       7.6        41       104        60
OIR    2025250     91400   21.7600 -108.7500       7.6        41       103        60
OIR    2025250     91400   21.7600 -108.7600       7.6        41       103        60
OIR    2025250     91400   21.7600 -108.7700       7.6        41       103        60
OIR    2025250     91400   21.7600 -108.7800       7.6        41       104        60
OIR    2025250     91400   21.7600 -108.7900       7.6        41       104        60
OIR    2025250     91400   21.7600 -108.8000       7.6        41       104        60
OIR    2025250     91400   21.7600 -108.8100       7.6        41       104        60
OIR    2025250     91400   21.7600 -108.8200       7.6        41       104        60
OIR    2025250     91400   21.7600 -108.8300       7.6        41       104        60
OIR    2025250     91400   21.7600 -108.8400       7.6        41       105        60
OIR    2025250     91400   21.7600 -108.8500       7.6        41       105        60
OIR    2025250     91400   21.7600 -108.8600       7.6        41       105        60
OIR    2025250     91400   21.7600 -108.8700       7.6        41       104        60
OIR    2025250     91400   21.7600 -108.8800       7.6        41       104        60
OIR    2025250     91400   21.7600 -108.8900       7.6        41       105        60
OIR    2025250     91400   21.7600 -108.9000       7.6        41       105        60
OIR    2025250     91400   21.7600 -108.9100       7.6        41       107        60
OIR    2025250     91400   21.7600 -108.9200       7.6        41       109        60
OIR    2025250     91400   21.7600 -108.9300       7.6        41       109        60
OIR    2025250     91400   21.7600 -108.9400       7.6        41       109        60
OIR    2025250     91400   21.7600 -108.9500       7.6        41       109        60
OIR    2025250     91400   21.7600 -108.9600       7.6        41       110        60
OIR    2025250     91400   21.7600 -108.9700       7.6        41       110        60
OIR    2025250     91400   21.7600 -108.9800       7.6        41       110        60
OIR    2025250     91400   21.7600 -108.9900       7.6        41       109        60
OIR    2025250     91400   21.7600 -109.0000       7.6        41       108        60
OIR    2025250     91400   21.7600 -109.0100       7.6        41       109        60
OIR    2025250     91400   21.7600 -109.0200       7.6        41       109        60
OIR    2025250     91400   21.7600 -109.0300       7.6        41       109        60
OIR    2025250     91400   21.7600 -109.0400       7.5        41       109        60
OIR    2025250     91400   21.7600 -109.0500       7.5        41       108        60
OIR    2025250     91400   21.7600 -109.0600       7.5        41       109        60
OIR    2025250     91400   21.7600 -109.0700       7.5        41       109        60
OIR    2025250     91400   21.7600 -109.0800       7.5        41       109        60
OIR    2025250     91400   21.7600 -109.0900       7.5        41       108        60
OIR    2025250     91400   21.7600 -109.1000       7.5        41       107        60
OIR    2025250     91400   21.7600 -109.1100       7.5        41       107        60
OIR    2025250     91400   21.7600 -109.1200       7.5        41       108        60
OIR    2025250     91400   21.7600 -109.1300       7.5        41       108        60
OIR    2025250     91400   21.7600 -109.1400       7.5        41       108        60
OIR    2025250     91400   21.7600 -109.1500       7.5        42       108        60
OIR    2025250     91400   21.7600 -109.1600       7.4        42       108        60
OIR    2025250     91400   21.7600 -109.1700       7.4        42       108        60
OIR    2025250     91400   21.7600 -109.1800       7.4        42       108        60
OIR    2025250     91400   21.7600 -109.1900       7.4        42       108        60
OIR    2025250     91400   21.7600 -109.2000       7.4        42       108        60
OIR    2025250     91400   21.7600 -109.2100       7.4        42       109        60
OIR    2025250     91400   21.7600 -109.2200       7.4        42       110        60
OIR    2025250     91400   21.7600 -109.2300       7.4        42       111        60
OIR    2025250     91400   21.7600 -109.2400       7.3        42       111        60
OIR    2025250     91400   21.7600 -109.2500       7.3        42       111        60
OIR    2025250     91400   21.7600 -109.2600       7.3        42       112        60
OIR    2025250     91400   21.7600 -109.2700       7.3        42       112        60
OIR    2025250     91400   21.7600 -109.2800       7.3        42       112        60
OIR    2025250     91400   21.7600 -109.2900       7.3        42       112        60
OIR    2025250     91400   21.7600 -109.3000       7.2        42       113        60
OIR    2025250     91400   21.7600 -109.3100       7.2        42       112        60
OIR    2025250     91400   21.7600 -109.3200       7.2        42       112        60
OIR    2025250     91400   21.7600 -109.3300       7.2        42       112        60
OIR    2025250     91400   21.7600 -109.3400       7.2        42       113        60
OIR    2025250     91400   21.7600 -109.3500       7.2        42       113        60
OIR    2025250     91400   21.7600 -109.3600       7.2        42       113        60
OIR    2025250     91400   21.7600 -109.3700       7.1        42       112        60
OIR    2025250     91400   21.7600 -109.3800       7.1        42       112        60
OIR    2025250     91400   21.7600 -109.3900       7.1        42       113        60
OIR    2025250     91400   21.7600 -109.4000       7.1        42       114        60
OIR    2025250     91400   21.7600 -109.4100       7.1        42       113        60
OIR    2025250     91400   21.7600 -109.4200       7.0        42       112        60
OIR    2025250     91400   21.7600 -109.4300       7.0        42       112        60
OIR    2025250     91400   21.7600 -109.4400       7.0        42       113        60
OIR    2025250     91400   21.7600 -109.4500       6.9        42       113        60
OIR    2025250     91400   21.7600 -109.4600       6.9        42       114        60
OIR    2025250     91400   21.7600 -109.4700       6.8        42       113        60
OIR    2025250     91400   21.7600 -109.4800       6.8        42       113        60
OIR    2025250     91400   21.7600 -109.4900       6.8        42       113        60
OIR    2025250     91400   21.7600 -109.5000       6.7        42       113        60
OIR    2025250     91400   21.7600 -109.5100       6.7        42       112        60
OIR    2025250     91400   21.7600 -109.5200       6.6        42       111        60
OIR    2025250     91400   21.7600 -109.5300       6.6        41       112        60
OIR    2025250     91400   21.7600 -109.5400       6.5        41       112        60
OIR    2025250     91400   21.7600 -109.5500       6.4        41       113        60
OIR    2025250     91400   21.7600 -109.5600       6.2        41       112        60
OIR    2025250     91400   21.7600 -109.5700       6.1        41       112        60
OIR    2025250     91400   21.7600 -109.5800       6.0        41       111        60
OIR    2025250     91400   21.7600 -109.5900       5.8        41       110        60
OIR    2025250     91400   21.7600 -109.6000       5.6        41       109        60
OIR    2025250     91400   21.7600 -109.6100       5.1        41       109        60
OIR    2025250     91400   21.7600 -109.6200       4.7        42       109        60
OIR    2025250     91400   21.7600 -109.6300       4.2        44       109        60
OIR    2025250     91400   21.7600 -110.0500       4.0        56       137        60
OIR    2025250     91400   21.7600 -110.0600       4.1        57       138        60
OIR    2025250     91400   21.7600 -110.0700       4.1        57       139        60
OIR    2025250     91400   21.7600 -114.8900      17.2       134       136        60
OIR    2025250     91400   21.7500 -108.6100       7.7        41       105        60
OIR    2025250     91400   21.7500 -108.6200       7.6        41       105        60
OIR    2025250     91400   21.7500 -108.6300       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.6400       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.6500       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.6600       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.6700       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.6800       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.6900       7.6        41       107        60
OIR    2025250     91400   21.7500 -108.7000       7.6        41       108        60
OIR    2025250     91400   21.7500 -108.7100       7.6        41       109        60
OIR    2025250     91400   21.7500 -108.7200       7.6        41       109        60
OIR    2025250     91400   21.7500 -108.7300       7.6        41       108        60
OIR    2025250     91400   21.7500 -108.7400       7.6        41       105        60
OIR    2025250     91400   21.7500 -108.7500       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.7600       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.7700       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.7800       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.7900       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.8000       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.8100       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.8200       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.8300       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.8400       7.6        41       105        60
OIR    2025250     91400   21.7500 -108.8500       7.6        41       105        60
OIR    2025250     91400   21.7500 -108.8600       7.6        41       105        60
OIR    2025250     91400   21.7500 -108.8700       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.8800       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.8900       7.6        41       104        60
OIR    2025250     91400   21.7500 -108.9000       7.6        41       105        60
OIR    2025250     91400   21.7500 -108.9100       7.6        41       107        60
OIR    2025250     91400   21.7500 -108.9200       7.6        41       109        60
OIR    2025250     91400   21.7500 -108.9300       7.6        41       110        60
OIR    2025250     91400   21.7500 -108.9400       7.6        41       110        60
OIR    2025250     91400   21.7500 -108.9500       7.6        41       109        60
OIR    2025250     91400   21.7500 -108.9600       7.6        42       109        60
OIR    2025250     91400   21.7500 -108.9700       7.6        42       110        60
OIR    2025250     91400   21.7500 -108.9800       7.6        42       110        60
OIR    2025250     91400   21.7500 -108.9900       7.6        42       109        60
OIR    2025250     91400   21.7500 -109.0000       7.6        42       108        60
OIR    2025250     91400   21.7500 -109.0100       7.6        42       108        60
OIR    2025250     91400   21.7500 -109.0200       7.6        42       109        60
OIR    2025250     91400   21.7500 -109.0300       7.6        42       109        60
OIR    2025250     91400   21.7500 -109.0400       7.6        42       109        60
OIR    2025250     91400   21.7500 -109.0500       7.5        42       108        60
OIR    2025250     91400   21.7500 -109.0600       7.5        42       108        60
OIR    2025250     91400   21.7500 -109.0700       7.5        41       109        60
OIR    2025250     91400   21.7500 -109.0800       7.5        41       109        60
OIR    2025250     91400   21.7500 -109.0900       7.5        42       108        60
OIR    2025250     91400   21.7500 -109.1000       7.5        42       108        60
OIR    2025250     91400   21.7500 -109.1100       7.5        42       107        60
OIR    2025250     91400   21.7500 -109.1200       7.5        42       107        60
OIR    2025250     91400   21.7500 -109.1300       7.5        42       107        60
OIR    2025250     91400   21.7500 -109.1400       7.5        42       105        60
OIR    2025250     91400   21.7500 -109.1500       7.5        42       105        60
OIR    2025250     91400   21.7500 -109.1600       7.4        42       107        60
OIR    2025250     91400   21.7500 -109.1700       7.4        42       108        60
OIR    2025250     91400   21.7500 -109.1800       7.4        42       109        60
OIR    2025250     91400   21.7500 -109.1900       7.4        42       109        60
OIR    2025250     91400   21.7500 -109.2000       7.4        42       109        60
OIR    2025250     91400   21.7500 -109.2100       7.4        42       110        60
OIR    2025250     91400   21.7500 -109.2200       7.4        42       110        60
OIR    2025250     91400   21.7500 -109.2300       7.4        42       111        60
OIR    2025250     91400   21.7500 -109.2400       7.3        42       112        60
OIR    2025250     91400   21.7500 -109.2500       7.3        42       113        60
OIR    2025250     91400   21.7500 -109.2600       7.3        42       113        60
OIR    2025250     91400   21.7500 -109.2700       7.3        42       112        60
OIR    2025250     91400   21.7500 -109.2800       7.3        42       111        60
OIR    2025250     91400   21.7500 -109.2900       7.3        42       112        60
OIR    2025250     91400   21.7500 -109.3000       7.2        42       112        60
OIR    2025250     91400   21.7500 -109.3100       7.2        42       112        60
OIR    2025250     91400   21.7500 -109.3200       7.2        42       112        60
OIR    2025250     91400   21.7500 -109.3300       7.2        42       111        60
OIR    2025250     91400   21.7500 -109.3400       7.2        42       112        60
OIR    2025250     91400   21.7500 -109.3500       7.2        42       114        60
OIR    2025250     91400   21.7500 -109.3600       7.2        42       113        60
OIR    2025250     91400   21.7500 -109.3700       7.1        42       112        60
OIR    2025250     91400   21.7500 -109.3800       7.1        42       112        60
OIR    2025250     91400   21.7500 -109.3900       7.1        42       113        60
OIR    2025250     91400   21.7500 -109.4000       7.1        42       113        60
OIR    2025250     91400   21.7500 -109.4100       7.1        42       112        60
OIR    2025250     91400   21.7500 -109.4200       7.0        42       111        60
OIR    2025250     91400   21.7500 -109.4300       7.0        42       110        60
OIR    2025250     91400   21.7500 -109.4400       7.0        42       110        60
OIR    2025250     91400   21.7500 -109.4500       6.9        42       110        60
OIR    2025250     91400   21.7500 -109.4600       6.9        42       111        60
OIR    2025250     91400   21.7500 -109.4700       6.8        42       112        60
OIR    2025250     91400   21.7500 -109.4800       6.8        42       113        60
OIR    2025250     91400   21.7500 -109.4900       6.7        42       113        60
OIR    2025250     91400   21.7500 -109.5000       6.7        42       113        60
OIR    2025250     91400   21.7500 -109.5100       6.6        42       112        60
OIR    2025250     91400   21.7500 -109.5200       6.6        42       111        60
OIR    2025250     91400   21.7500 -109.5300       6.5        42       111        60
OIR    2025250     91400   21.7500 -109.5400       6.4        41       112        60
OIR    2025250     91400   21.7500 -109.5500       6.3        41       112        60
OIR    2025250     91400   21.7500 -109.5600       6.1        41       113        60
OIR    2025250     91400   21.7500 -109.5700       6.0        41       113        60
OIR    2025250     91400   21.7500 -109.5800       5.9        41       113        60
OIR    2025250     91400   21.7500 -109.5900       5.7        41       111        60
OIR    2025250     91400   21.7500 -109.6000       5.4        41       109        60
OIR    2025250     91400   21.7500 -109.6100       4.9        42       108        60
OIR    2025250     91400   21.7500 -109.6200       4.4        43       107        60
OIR    2025250     91400   21.7500 -109.6300       4.0        44       107        60
OIR    2025250     91400   21.7500 -110.0500       4.0        56       136        60
OIR    2025250     91400   21.7500 -110.0600       4.0        57       137        60
OIR    2025250     91400   21.7500 -110.0700       4.1        57       138        60
OIR    2025250     91400   21.7500 -110.0800       4.1        58       139        60
OIR    2025250     91400   21.7500 -110.0900       4.1        58       140        60
OIR    2025250     91400   21.7400 -108.6100       7.7        41       107        60
OIR    2025250     91400   21.7400 -108.6200       7.6        41       107        60
OIR    2025250     91400   21.7400 -108.6300       7.6        41       107        60
OIR    2025250     91400   21.7400 -108.6400       7.6        41       107        60
OIR    2025250     91400   21.7400 -108.6500       7.6        41       107        60
OIR    2025250     91400   21.7400 -108.6600       7.6        41       107        60
OIR    2025250     91400   21.7400 -108.6700       7.6        41       107        60
OIR    2025250     91400   21.7400 -108.6800       7.6        41       107        60
OIR    2025250     91400   21.7400 -108.6900       7.6        41       108        60
OIR    2025250     91400   21.7400 -108.7000       7.6        41       110        60
OIR    2025250     91400   21.7400 -108.7100       7.6        41       111        60
OIR    2025250     91400   21.7400 -108.7200       7.6        41       111        60
OIR    2025250     91400   21.7400 -108.7300       7.6        41       111        60
OIR    2025250     91400   21.7400 -108.7400       7.6        41       109        60
OIR    2025250     91400   21.7400 -108.7500       7.6        41       107        60
OIR    2025250     91400   21.7400 -108.7600       7.6        41       104        60
OIR    2025250     91400   21.7400 -108.7700       7.6        41       104        60
OIR    2025250     91400   21.7400 -108.7800       7.6        41       104        60
OIR    2025250     91400   21.7400 -108.7900       7.6        41       105        60
OIR    2025250     91400   21.7400 -108.8000       7.6        41       105        60
OIR    2025250     91400   21.7400 -108.8100       7.6        41       105        60
OIR    2025250     91400   21.7400 -108.8200       7.6        41       105        60
OIR    2025250     91400   21.7400 -108.8300       7.6        41       104        60
OIR    2025250     91400   21.7400 -108.8400       7.6        41       105        60
OIR    2025250     91400   21.7400 -108.8500       7.6        41       107        60
OIR    2025250     91400   21.7400 -108.8600       7.6        41       108        60
OIR    2025250     91400   21.7400 -108.8700       7.6        41       107        60
OIR    2025250     91400   21.7400 -108.8800       7.6        41       107        60
OIR    2025250     91400   21.7400 -108.8900       7.6        41       108        60
OIR    2025250     91400   21.7400 -108.9000       7.6        42       108        60
OIR    2025250     91400   21.7400 -108.9100       7.6        42       108        60
OIR    2025250     91400   21.7400 -108.9200       7.6        42       109        60
OIR    2025250     91400   21.7400 -108.9300       7.6        42       109        60
OIR    2025250     91400   21.7400 -108.9400       7.6        42       109        60
OIR    2025250     91400   21.7400 -108.9500       7.6        42       109        60
OIR    2025250     91400   21.7400 -108.9600       7.6        42       109        60
OIR    2025250     91400   21.7400 -108.9700       7.6        42       110        60
OIR    2025250     91400   21.7400 -108.9800       7.6        42       110        60
OIR    2025250     91400   21.7400 -108.9900       7.6        42       110        60
OIR    2025250     91400   21.7400 -109.0000       7.6        42       110        60
OIR    2025250     91400   21.7400 -109.0100       7.6        42       109        60
OIR    2025250     91400   21.7400 -109.0200       7.6        42       109        60
OIR    2025250     91400   21.7400 -109.0300       7.6        42       110        60
OIR    2025250     91400   21.7400 -109.0400       7.6        42       109        60
OIR    2025250     91400   21.7400 -109.0500       7.6        42       109        60
OIR    2025250     91400   21.7400 -109.0600       7.5        42       109        60
OIR    2025250     91400   21.7400 -109.0700       7.5        42       109        60
OIR    2025250     91400   21.7400 -109.0800       7.5        42       109        60
OIR    2025250     91400   21.7400 -109.0900       7.5        42       109        60
OIR    2025250     91400   21.7400 -109.1000       7.5        42       109        60
OIR    2025250     91400   21.7400 -109.1100       7.5        42       109        60
OIR    2025250     91400   21.7400 -109.1200       7.5        42       108        60
OIR    2025250     91400   21.7400 -109.1300       7.5        42       105        60
OIR    2025250     91400   21.7400 -109.1400       7.5        42       104        60
OIR    2025250     91400   21.7400 -109.1500       7.5        42       104        60
OIR    2025250     91400   21.7400 -109.1600       7.5        42       104        60
OIR    2025250     91400   21.7400 -109.1700       7.4        42       105        60
OIR    2025250     91400   21.7400 -109.1800       7.4        42       109        60
OIR    2025250     91400   21.7400 -109.1900       7.4        42       109        60
OIR    2025250     91400   21.7400 -109.2000       7.4        42       110        60
OIR    2025250     91400   21.7400 -109.2100       7.4        42       110        60
OIR    2025250     91400   21.7400 -109.2200       7.4        42       111        60
OIR    2025250     91400   21.7400 -109.2300       7.4        42       111        60
OIR    2025250     91400   21.7400 -109.2400       7.3        42       113        60
OIR    2025250     91400   21.7400 -109.2500       7.3        42       115        60
OIR    2025250     91400   21.7400 -109.2600       7.3        42       116        60
OIR    2025250     91400   21.7400 -109.2700       7.3        42       114        60
OIR    2025250     91400   21.7400 -109.2800       7.3        42       113        60
OIR    2025250     91400   21.7400 -109.2900       7.3        42       112        60
OIR    2025250     91400   21.7400 -109.3000       7.2        42       112        60
OIR    2025250     91400   21.7400 -109.3100       7.2        42       112        60
OIR    2025250     91400   21.7400 -109.3200       7.2        42       113        60
OIR    2025250     91400   21.7400 -109.3300       7.2        42       114        60
OIR    2025250     91400   21.7400 -109.3400       7.2        42       115        60
OIR    2025250     91400   21.7400 -109.3500       7.2        42       115        60
OIR    2025250     91400   21.7400 -109.3600       7.2        42       114        60
OIR    2025250     91400   21.7400 -109.3700       7.1        42       114        60
OIR    2025250     91400   21.7400 -109.3800       7.1        42       113        60
OIR    2025250     91400   21.7400 -109.3900       7.1        42       114        60
OIR    2025250     91400   21.7400 -109.4000       7.1        42       115        60
OIR    2025250     91400   21.7400 -109.4100       7.1        42       115        60
OIR    2025250     91400   21.7400 -109.4200       7.0        42       114        60
OIR    2025250     91400   21.7400 -109.4300       7.0        42       114        60
OIR    2025250     91400   21.7400 -109.4400       6.9        42       114        60
OIR    2025250     91400   21.7400 -109.4500       6.9        42       113        60
OIR    2025250     91400   21.7400 -109.4600       6.8        42       113        60
OIR    2025250     91400   21.7400 -109.4700       6.8        42       112        60
OIR    2025250     91400   21.7400 -109.4800       6.7        42       112        60
OIR    2025250     91400   21.7400 -109.4900       6.7        42       112        60
OIR    2025250     91400   21.7400 -109.5000       6.6        42       112        60
OIR    2025250     91400   21.7400 -109.5100       6.6        42       112        60
OIR    2025250     91400   21.7400 -109.5200       6.6        42       110        60
OIR    2025250     91400   21.7400 -109.5300       6.5        42       109        60
OIR    2025250     91400   21.7400 -109.5400       6.3        42       110        60
OIR    2025250     91400   21.7400 -109.5500       6.2        41       112        60
OIR    2025250     91400   21.7400 -109.5600       6.1        41       112        60
OIR    2025250     91400   21.7400 -109.5700       6.0        41       112        60
OIR    2025250     91400   21.7400 -109.5800       5.8        41       113        60
OIR    2025250     91400   21.7400 -109.5900       5.6        41       111        60
OIR    2025250     91400   21.7400 -109.6000       5.2        42       109        60
OIR    2025250     91400   21.7400 -109.6100       4.7        42       108        60
OIR    2025250     91400   21.7400 -109.6200       4.2        44       107        60
OIR    2025250     91400   21.7400 -110.0500       4.0        56       137        60
OIR    2025250     91400   21.7400 -110.0600       4.0        57       138        60
OIR    2025250     91400   21.7400 -110.0700       4.1        57       139        60
OIR    2025250     91400   21.7400 -110.0800       4.1        58       139        60
OIR    2025250     91400   21.7400 -110.0900       4.1        58       139        60
OIR    2025250     91400   21.7400 -110.1000       4.2        58       140        60
OIR    2025250     91400   21.7300 -108.6100       7.7        41       105        60
OIR    2025250     91400   21.7300 -108.6200       7.7        41       105        60
OIR    2025250     91400   21.7300 -108.6300       7.6        41       105        60
OIR    2025250     91400   21.7300 -108.6400       7.6        41       107        60
OIR    2025250     91400   21.7300 -108.6500       7.6        41       108        60
OIR    2025250     91400   21.7300 -108.6600       7.6        41       109        60
OIR    2025250     91400   21.7300 -108.6700       7.6        41       108        60
OIR    2025250     91400   21.7300 -108.6800       7.6        41       107        60
OIR    2025250     91400   21.7300 -108.6900       7.6        41       108        60
OIR    2025250     91400   21.7300 -108.7000       7.6        41       109        60
OIR    2025250     91400   21.7300 -108.7100       7.6        41       111        60
OIR    2025250     91400   21.7300 -108.7200       7.6        41       111        60
OIR    2025250     91400   21.7300 -108.7300       7.6        41       111        60
OIR    2025250     91400   21.7300 -108.7400       7.6        41       109        60
OIR    2025250     91400   21.7300 -108.7500       7.6        41       107        60
OIR    2025250     91400   21.7300 -108.7600       7.6        41       105        60
OIR    2025250     91400   21.7300 -108.7700       7.6        41       105        60
OIR    2025250     91400   21.7300 -108.7800       7.6        41       104        60
OIR    2025250     91400   21.7300 -108.7900       7.6        41       105        60
OIR    2025250     91400   21.7300 -108.8000       7.6        41       107        60
OIR    2025250     91400   21.7300 -108.8100       7.7        41       107        60
OIR    2025250     91400   21.7300 -108.8200       7.7        41       107        60
OIR    2025250     91400   21.7300 -108.8300       7.7        41       105        60
OIR    2025250     91400   21.7300 -108.8400       7.7        41       105        60
OIR    2025250     91400   21.7300 -108.8500       7.6        41       107        60
OIR    2025250     91400   21.7300 -108.8600       7.6        41       108        60
OIR    2025250     91400   21.7300 -108.8700       7.6        42       109        60
OIR    2025250     91400   21.7300 -108.8800       7.6        42       110        60
OIR    2025250     91400   21.7300 -108.8900       7.6        42       110        60
OIR    2025250     91400   21.7300 -108.9000       7.6        42       110        60
OIR    2025250     91400   21.7300 -108.9100       7.6        42       110        60
OIR    2025250     91400   21.7300 -108.9200       7.6        42       110        60
OIR    2025250     91400   21.7300 -108.9300       7.6        42       109        60
OIR    2025250     91400   21.7300 -108.9400       7.6        42       109        60
OIR    2025250     91400   21.7300 -108.9500       7.6        42       109        60
OIR    2025250     91400   21.7300 -108.9600       7.6        42       109        60
OIR    2025250     91400   21.7300 -108.9700       7.6        42       110        60
OIR    2025250     91400   21.7300 -108.9800       7.6        42       110        60
OIR    2025250     91400   21.7300 -108.9900       7.6        42       111        60
OIR    2025250     91400   21.7300 -109.0000       7.6        42       112        60
OIR    2025250     91400   21.7300 -109.0100       7.6        42       113        60
OIR    2025250     91400   21.7300 -109.0200       7.6        42       112        60
OIR    2025250     91400   21.7300 -109.0300       7.6        42       111        60
OIR    2025250     91400   21.7300 -109.0400       7.6        42       110        60
OIR    2025250     91400   21.7300 -109.0500       7.6        42       110        60
OIR    2025250     91400   21.7300 -109.0600       7.6        42       109        60
OIR    2025250     91400   21.7300 -109.0700       7.5        42       110        60
OIR    2025250     91400   21.7300 -109.0800       7.5        42       110        60
OIR    2025250     91400   21.7300 -109.0900       7.5        42       111        60
OIR    2025250     91400   21.7300 -109.1000       7.5        42       112        60
OIR    2025250     91400   21.7300 -109.1100       7.5        42       113        60
OIR    2025250     91400   21.7300 -109.1200       7.5        42       111        60
OIR    2025250     91400   21.7300 -109.1300       7.5        42       110        60
OIR    2025250     91400   21.7300 -109.1400       7.5        42       109        60
OIR    2025250     91400   21.7300 -109.1500       7.5        42       108        60
OIR    2025250     91400   21.7300 -109.1600       7.5        42       108        60
OIR    2025250     91400   21.7300 -109.1700       7.4        42       109        60
OIR    2025250     91400   21.7300 -109.1800       7.4        42       110        60
OIR    2025250     91400   21.7300 -109.1900       7.4        42       111        60
OIR    2025250     91400   21.7300 -109.2000       7.4        42       111        60
OIR    2025250     91400   21.7300 -109.2100       7.4        42       111        60
OIR    2025250     91400   21.7300 -109.2200       7.4        42       112        60
OIR    2025250     91400   21.7300 -109.2300       7.4        42       112        60
OIR    2025250     91400   21.7300 -109.2400       7.4        42       113        60
OIR    2025250     91400   21.7300 -109.2500       7.3        42       115        60
OIR    2025250     91400   21.7300 -109.2600       7.3        42       116        60
OIR    2025250     91400   21.7300 -109.2700       7.3        42       116        60
OIR    2025250     91400   21.7300 -109.2800       7.3        42       115        60
OIR    2025250     91400   21.7300 -109.2900       7.3        42       114        60
OIR    2025250     91400   21.7300 -109.3000       7.2        42       113        60
OIR    2025250     91400   21.7300 -109.3100       7.2        42       113        60
OIR    2025250     91400   21.7300 -109.3200       7.2        42       115        60
OIR    2025250     91400   21.7300 -109.3300       7.2        42       116        60
OIR    2025250     91400   21.7300 -109.3400       7.2        42       116        60
OIR    2025250     91400   21.7300 -109.3500       7.2        42       116        60
OIR    2025250     91400   21.7300 -109.3600       7.2        42       116        60
OIR    2025250     91400   21.7300 -109.3700       7.1        42       116        60
OIR    2025250     91400   21.7300 -109.3800       7.1        42       116        60
OIR    2025250     91400   21.7300 -109.3900       7.1        42       116        60
OIR    2025250     91400   21.7300 -109.4000       7.1        42       116        60
OIR    2025250     91400   21.7300 -109.4100       7.0        42       116        60
OIR    2025250     91400   21.7300 -109.4200       7.0        42       116        60
OIR    2025250     91400   21.7300 -109.4300       7.0        42       116        60
OIR    2025250     91400   21.7300 -109.4400       6.9        42       116        60
OIR    2025250     91400   21.7300 -109.4500       6.9        42       116        60
OIR    2025250     91400   21.7300 -109.4600       6.8        42       116        60
OIR    2025250     91400   21.7300 -109.4700       6.7        42       113        60
OIR    2025250     91400   21.7300 -109.4800       6.7        42       111        60
OIR    2025250     91400   21.7300 -109.4900       6.6        42       111        60
OIR    2025250     91400   21.7300 -109.5000       6.6        42       112        60
OIR    2025250     91400   21.7300 -109.5100       6.5        42       112        60
OIR    2025250     91400   21.7300 -109.5200       6.5        42       110        60
OIR    2025250     91400   21.7300 -109.5300       6.4        42       108        60
OIR    2025250     91400   21.7300 -109.5400       6.3        42       109        60
OIR    2025250     91400   21.7300 -109.5500       6.1        42       111        60
OIR    2025250     91400   21.7300 -109.5600       6.0        42       111        60
OIR    2025250     91400   21.7300 -109.5700       5.9        41       110        60
OIR    2025250     91400   21.7300 -109.5800       5.7        41       110        60
OIR    2025250     91400   21.7300 -109.5900       5.4        42       109        60
OIR    2025250     91400   21.7300 -109.6000       5.0        42       109        60
OIR    2025250     91400   21.7300 -109.6100       4.5        43       109        60
OIR    2025250     91400   21.7300 -109.6200       4.0        45       108        60
OIR    2025250     91400   21.7300 -110.0600       4.0        57       138        60
OIR    2025250     91400   21.7300 -110.0700       4.1        58       139        60
OIR    2025250     91400   21.7300 -110.0800       4.1        58       140        60
OIR    2025250     91400   21.7300 -110.0900       4.1        58       140        60
OIR    2025250     91400   21.7300 -110.1000       4.1        58       139        60
OIR    2025250     91400   21.7200 -108.6100       7.6        41       104        60
OIR    2025250     91400   21.7200 -108.6200       7.6        41       104        60
OIR    2025250     91400   21.7200 -108.6300       7.6        41       104        60
OIR    2025250     91400   21.7200 -108.6400       7.6        41       105        60
OIR    2025250     91400   21.7200 -108.6500       7.6        41       108        60
OIR    2025250     91400   21.7200 -108.6600       7.6        41       110        60
OIR    2025250     91400   21.7200 -108.6700       7.6        41       109        60
OIR    2025250     91400   21.7200 -108.6800       7.7        41       107        60
OIR    2025250     91400   21.7200 -108.6900       7.6        41       107        60
OIR    2025250     91400   21.7200 -108.7000       7.6        41       108        60
OIR    2025250     91400   21.7200 -108.7100       7.6        41       109        60
OIR    2025250     91400   21.7200 -108.7200       7.6        41       109        60
OIR    2025250     91400   21.7200 -108.7300       7.6        41       109        60
OIR    2025250     91400   21.7200 -108.7400       7.6        41       108        60
OIR    2025250     91400   21.7200 -108.7500       7.6        41       105        60
OIR    2025250     91400   21.7200 -108.7600       7.7        41       104        60
OIR    2025250     91400   21.7200 -108.7700       7.7        41       104        60
OIR    2025250     91400   21.7200 -108.7800       7.7        41       104        60
OIR    2025250     91400   21.7200 -108.7900       7.7        42       104        60
OIR    2025250     91400   21.7200 -108.8000       7.7        42       105        60
OIR    2025250     91400   21.7200 -108.8100       7.7        42       107        60
OIR    2025250     91400   21.7200 -108.8200       7.7        42       107        60
OIR    2025250     91400   21.7200 -108.8300       7.7        42       107        60
OIR    2025250     91400   21.7200 -108.8400       7.7        42       107        60
OIR    2025250     91400   21.7200 -108.8500       7.7        42       107        60
OIR    2025250     91400   21.7200 -108.8600       7.6        42       108        60
OIR    2025250     91400   21.7200 -108.8700       7.6        42       108        60
OIR    2025250     91400   21.7200 -108.8800       7.6        42       109        60
OIR    2025250     91400   21.7200 -108.8900       7.6        42       109        60
OIR    2025250     91400   21.7200 -108.9000       7.6        42       110        60
OIR    2025250     91400   21.7200 -108.9100       7.6        42       110        60
OIR    2025250     91400   21.7200 -108.9200       7.6        42       110        60
OIR    2025250     91400   21.7200 -108.9300       7.6        42       109        60
OIR    2025250     91400   21.7200 -108.9400       7.6        42       109        60
OIR    2025250     91400   21.7200 -108.9500       7.6        42       109        60
OIR    2025250     91400   21.7200 -108.9600       7.6        42       110        60
OIR    2025250     91400   21.7200 -108.9700       7.6        42       110        60
OIR    2025250     91400   21.7200 -108.9800       7.6        42       111        60
OIR    2025250     91400   21.7200 -108.9900       7.6        42       111        60
OIR    2025250     91400   21.7200 -109.0000       7.6        42       113        60
OIR    2025250     91400   21.7200 -109.0100       7.6        42       115        60
OIR    2025250     91400   21.7200 -109.0200       7.6        42       113        60
OIR    2025250     91400   21.7200 -109.0300       7.6        42       112        60
OIR    2025250     91400   21.7200 -109.0400       7.6        42       110        60
OIR    2025250     91400   21.7200 -109.0500       7.6        42       110        60
OIR    2025250     91400   21.7200 -109.0600       7.6        42       110        60
OIR    2025250     91400   21.7200 -109.0700       7.6        42       111        60
OIR    2025250     91400   21.7200 -109.0800       7.5        42       111        60
OIR    2025250     91400   21.7200 -109.0900       7.5        42       112        60
OIR    2025250     91400   21.7200 -109.1000       7.5        42       113        60
OIR    2025250     91400   21.7200 -109.1100       7.5        42       115        60
OIR    2025250     91400   21.7200 -109.1200       7.5        42       115        60
OIR    2025250     91400   21.7200 -109.1300       7.5        42       113        60
OIR    2025250     91400   21.7200 -109.1400       7.5        42       111        60
OIR    2025250     91400   21.7200 -109.1500       7.5        42       111        60
OIR    2025250     91400   21.7200 -109.1600       7.5        42       111        60
OIR    2025250     91400   21.7200 -109.1700       7.5        42       112        60
OIR    2025250     91400   21.7200 -109.1800       7.4        42       112        60
OIR    2025250     91400   21.7200 -109.1900       7.4        42       113        60
OIR    2025250     91400   21.7200 -109.2000       7.4        42       113        60
OIR    2025250     91400   21.7200 -109.2100       7.4        42       113        60
OIR    2025250     91400   21.7200 -109.2200       7.4        42       113        60
OIR    2025250     91400   21.7200 -109.2300       7.4        42       113        60
OIR    2025250     91400   21.7200 -109.2400       7.4        42       113        60
OIR    2025250     91400   21.7200 -109.2500       7.3        42       114        60
OIR    2025250     91400   21.7200 -109.2600       7.3        42       116        60
OIR    2025250     91400   21.7200 -109.2700       7.3        42       116        60
OIR    2025250     91400   21.7200 -109.2800       7.3        42       116        60
OIR    2025250     91400   21.7200 -109.2900       7.3        42       117        60
OIR    2025250     91400   21.7200 -109.3000       7.2        42       116        60
OIR    2025250     91400   21.7200 -109.3100       7.2        42       116        60
OIR    2025250     91400   21.7200 -109.3200       7.2        42       116        60
OIR    2025250     91400   21.7200 -109.3300       7.2        42       116        60
OIR    2025250     91400   21.7200 -109.3400       7.2        42       116        60
OIR    2025250     91400   21.7200 -109.3500       7.2        42       117        60
OIR    2025250     91400   21.7200 -109.3600       7.2        42       119        60
OIR    2025250     91400   21.7200 -109.3700       7.1        42       120        60
OIR    2025250     91400   21.7200 -109.3800       7.1        42       120        60
OIR    2025250     91400   21.7200 -109.3900       7.1        42       120        60
OIR    2025250     91400   21.7200 -109.4000       7.1        42       117        60
OIR    2025250     91400   21.7200 -109.4100       7.0        42       116        60
OIR    2025250     91400   21.7200 -109.4200       7.0        42       116        60
OIR    2025250     91400   21.7200 -109.4300       6.9        42       116        60
OIR    2025250     91400   21.7200 -109.4400       6.9        42       116        60
OIR    2025250     91400   21.7200 -109.4500       6.8        42       116        60
OIR    2025250     91400   21.7200 -109.4600       6.7        43       116        60
OIR    2025250     91400   21.7200 -109.4700       6.7        43       115        60
OIR    2025250     91400   21.7200 -109.4800       6.6        43       113        60
OIR    2025250     91400   21.7200 -109.4900       6.6        43       112        60
OIR    2025250     91400   21.7200 -109.5000       6.5        43       112        60
OIR    2025250     91400   21.7200 -109.5100       6.5        42       113        60
OIR    2025250     91400   21.7200 -109.5200       6.4        42       111        60
OIR    2025250     91400   21.7200 -109.5300       6.3        42       109        60
OIR    2025250     91400   21.7200 -109.5400       6.2        42       109        60
OIR    2025250     91400   21.7200 -109.5500       6.1        42       110        60
OIR    2025250     91400   21.7200 -109.5600       6.0        42       111        60
OIR    2025250     91400   21.7200 -109.5700       5.8        42       110        60
OIR    2025250     91400   21.7200 -109.5800       5.6        42       109        60
OIR    2025250     91400   21.7200 -109.5900       5.2        42       108        60
OIR    2025250     91400   21.7200 -109.6000       4.8        43       109        60
OIR    2025250     91400   21.7200 -109.6100       4.3        44       109        60
OIR    2025250     91400   21.7200 -110.0600       4.0        57       139        60
OIR    2025250     91400   21.7200 -110.0700       4.0        58       140        60
OIR    2025250     91400   21.7200 -110.0800       4.1        58       141        60
OIR    2025250     91400   21.7200 -110.0900       4.1        58       140        60
OIR    2025250     91400   21.7200 -110.1000       4.1        58       140        60
OIR    2025250     91400   21.7100 -108.6100       7.6        41       104        60
OIR    2025250     91400   21.7100 -108.6200       7.6        41       104        60
OIR    2025250     91400   21.7100 -108.6300       7.6        41       104        60
OIR    2025250     91400   21.7100 -108.6400       7.6        41       105        60
OIR    2025250     91400   21.7100 -108.6500       7.6        41       107        60
OIR    2025250     91400   21.7100 -108.6600       7.6        41       109        60
OIR    2025250     91400   21.7100 -108.6700       7.7        41       109        60
OIR    2025250     91400   21.7100 -108.6800       7.7        41       108        60
OIR    2025250     91400   21.7100 -108.6900       7.6        41       107        60
OIR    2025250     91400   21.7100 -108.7000       7.6        41       108        60
OIR    2025250     91400   21.7100 -108.7100       7.6        41       109        60
OIR    2025250     91400   21.7100 -108.7200       7.6        41       109        60
OIR    2025250     91400   21.7100 -108.7300       7.6        41       108        60
OIR    2025250     91400   21.7100 -108.7400       7.6        41       107        60
OIR    2025250     91400   21.7100 -108.7500       7.7        41       105        60
OIR    2025250     91400   21.7100 -108.7600       7.7        42       104        60
OIR    2025250     91400   21.7100 -108.7700       7.7        42       104        60
OIR    2025250     91400   21.7100 -108.7800       7.7        42       104        60
OIR    2025250     91400   21.7100 -108.7900       7.7        42       103        60
OIR    2025250     91400   21.7100 -108.8000       7.7        42       104        60
OIR    2025250     91400   21.7100 -108.8100       7.7        42       105        60
OIR    2025250     91400   21.7100 -108.8200       7.7        42       107        60
OIR    2025250     91400   21.7100 -108.8300       7.7        42       107        60
OIR    2025250     91400   21.7100 -108.8400       7.7        42       108        60
OIR    2025250     91400   21.7100 -108.8500       7.7        42       108        60
OIR    2025250     91400   21.7100 -108.8600       7.7        42       108        60
OIR    2025250     91400   21.7100 -108.8700       7.7        42       108        60
OIR    2025250     91400   21.7100 -108.8800       7.6        42       108        60
OIR    2025250     91400   21.7100 -108.8900       7.6        42       109        60
OIR    2025250     91400   21.7100 -108.9000       7.6        42       109        60
OIR    2025250     91400   21.7100 -108.9100       7.6        42       110        60
OIR    2025250     91400   21.7100 -108.9200       7.6        42       110        60
OIR    2025250     91400   21.7100 -108.9300       7.6        42       109        60
OIR    2025250     91400   21.7100 -108.9400       7.6        42       108        60
OIR    2025250     91400   21.7100 -108.9500       7.6        42       109        60
OIR    2025250     91400   21.7100 -108.9600       7.6        42       110        60
OIR    2025250     91400   21.7100 -108.9700       7.6        42       110        60
OIR    2025250     91400   21.7100 -108.9800       7.6        42       111        60
OIR    2025250     91400   21.7100 -108.9900       7.6        42       111        60
OIR    2025250     91400   21.7100 -109.0000       7.6        42       112        60
OIR    2025250     91400   21.7100 -109.0100       7.6        42       114        60
OIR    2025250     91400   21.7100 -109.0200       7.6        42       114        60
OIR    2025250     91400   21.7100 -109.0300       7.6        42       112        60
OIR    2025250     91400   21.7100 -109.0400       7.6        42       110        60
OIR    2025250     91400   21.7100 -109.0500       7.6        42       111        60
OIR    2025250     91400   21.7100 -109.0600       7.6        42       111        60
OIR    2025250     91400   21.7100 -109.0700       7.6        42       112        60
OIR    2025250     91400   21.7100 -109.0800       7.6        42       113        60
OIR    2025250     91400   21.7100 -109.0900       7.5        42       113        60
OIR    2025250     91400   21.7100 -109.1000       7.5        42       114        60
OIR    2025250     91400   21.7100 -109.1100       7.5        42       116        60
OIR    2025250     91400   21.7100 -109.1200       7.5        42       116        60
OIR    2025250     91400   21.7100 -109.1300       7.5        42       114        60
OIR    2025250     91400   21.7100 -109.1400       7.5        42       112        60
OIR    2025250     91400   21.7100 -109.1500       7.5        42       112        60
OIR    2025250     91400   21.7100 -109.1600       7.5        42       112        60
OIR    2025250     91400   21.7100 -109.1700       7.5        42       112        60
OIR    2025250     91400   21.7100 -109.1800       7.4        42       114        60
OIR    2025250     91400   21.7100 -109.1900       7.4        42       115        60
OIR    2025250     91400   21.7100 -109.2000       7.4        42       114        60
OIR    2025250     91400   21.7100 -109.2100       7.4        42       113        60
OIR    2025250     91400   21.7100 -109.2200       7.4        42       113        60
OIR    2025250     91400   21.7100 -109.2300       7.4        42       114        60
OIR    2025250     91400   21.7100 -109.2400       7.4        42       115        60
OIR    2025250     91400   21.7100 -109.2500       7.3        42       115        60
OIR    2025250     91400   21.7100 -109.2600       7.3        42       115        60
OIR    2025250     91400   21.7100 -109.2700       7.3        42       116        60
OIR    2025250     91400   21.7100 -109.2800       7.3        42       117        60
OIR    2025250     91400   21.7100 -109.2900       7.3        42       119        60
OIR    2025250     91400   21.7100 -109.3000       7.3        42       119        60
OIR    2025250     91400   21.7100 -109.3100       7.2        42       117        60
OIR    2025250     91400   21.7100 -109.3200       7.2        42       116        60
OIR    2025250     91400   21.7100 -109.3300       7.2        42       116        60
OIR    2025250     91400   21.7100 -109.3400       7.2        42       116        60
OIR    2025250     91400   21.7100 -109.3500       7.2        42       119        60
OIR    2025250     91400   21.7100 -109.3600       7.2        42       121        60
OIR    2025250     91400   21.7100 -109.3700       7.1        42       122        60
OIR    2025250     91400   21.7100 -109.3800       7.1        42       123        60
OIR    2025250     91400   21.7100 -109.3900       7.1        42       123        60
OIR    2025250     91400   21.7100 -109.4000       7.1        42       121        60
OIR    2025250     91400   21.7100 -109.4100       7.0        42       119        60
OIR    2025250     91400   21.7100 -109.4200       7.0        42       116        60
OIR    2025250     91400   21.7100 -109.4300       6.9        43       115        60
OIR    2025250     91400   21.7100 -109.4400       6.8        43       114        60
OIR    2025250     91400   21.7100 -109.4500       6.7        43       115        60
OIR    2025250     91400   21.7100 -109.4600       6.7        43       116        60
OIR    2025250     91400   21.7100 -109.4700       6.6        43       116        60
OIR    2025250     91400   21.7100 -109.4800       6.6        43       115        60
OIR    2025250     91400   21.7100 -109.4900       6.5        43       114        60
OIR    2025250     91400   21.7100 -109.5000       6.5        43       114        60
OIR    2025250     91400   21.7100 -109.5100       6.4        43       114        60
OIR    2025250     91400   21.7100 -109.5200       6.3        43       113        60
OIR    2025250     91400   21.7100 -109.5300       6.3        43       111        60
OIR    2025250     91400   21.7100 -109.5400       6.1        43       110        60
OIR    2025250     91400   21.7100 -109.5500       6.0        42       111        60
OIR    2025250     91400   21.7100 -109.5600       5.9        42       112        60
OIR    2025250     91400   21.7100 -109.5700       5.7        42       111        60
OIR    2025250     91400   21.7100 -109.5800       5.4        43       110        60
OIR    2025250     91400   21.7100 -109.5900       5.0        43       109        60
OIR    2025250     91400   21.7100 -109.6000       4.5        44       109        60
OIR    2025250     91400   21.7100 -109.6100       4.1        45       110        60
OIR    2025250     91400   21.7100 -110.0700       4.0        58       141        60
OIR    2025250     91400   21.7000 -108.6100       7.6        41       104        60
OIR    2025250     91400   21.7000 -108.6200       7.6        41       104        60
OIR    2025250     91400   21.7000 -108.6300       7.6        41       104        60
OIR    2025250     91400   21.7000 -108.6400       7.6        41       105        60
OIR    2025250     91400   21.7000 -108.6500       7.6        41       107        60
OIR    2025250     91400   21.7000 -108.6600       7.6        41       108        60
OIR    2025250     91400   21.7000 -108.6700       7.7        41       109        60
OIR    2025250     91400   21.7000 -108.6800       7.7        41       108        60
OIR    2025250     91400   21.7000 -108.6900       7.6        41       107        60
OIR    2025250     91400   21.7000 -108.7000       7.6        41       108        60
OIR    2025250     91400   21.7000 -108.7100       7.6        41       109        60
OIR    2025250     91400   21.7000 -108.7200       7.6        41       109        60
OIR    2025250     91400   21.7000 -108.7300       7.6        41       108        60
OIR    2025250     91400   21.7000 -108.7400       7.6        42       107        60
OIR    2025250     91400   21.7000 -108.7500       7.7        42       105        60
OIR    2025250     91400   21.7000 -108.7600       7.7        42       104        60
OIR    2025250     91400   21.7000 -108.7700       7.7        42       104        60
OIR    2025250     91400   21.7000 -108.7800       7.7        42       104        60
OIR    2025250     91400   21.7000 -108.7900       7.7        42       104        60
OIR    2025250     91400   21.7000 -108.8000       7.7        42       104        60
OIR    2025250     91400   21.7000 -108.8100       7.7        42       105        60
OIR    2025250     91400   21.7000 -108.8200       7.7        42       105        60
OIR    2025250     91400   21.7000 -108.8300       7.7        42       107        60
OIR    2025250     91400   21.7000 -108.8400       7.7        42       107        60
OIR    2025250     91400   21.7000 -108.8500       7.7        42       108        60
OIR    2025250     91400   21.7000 -108.8600       7.7        42       108        60
OIR    2025250     91400   21.7000 -108.8700       7.7        42       109        60
OIR    2025250     91400   21.7000 -108.8800       7.7        42       108        60
OIR    2025250     91400   21.7000 -108.8900       7.7        42       108        60
OIR    2025250     91400   21.7000 -108.9000       7.7        42       108        60
OIR    2025250     91400   21.7000 -108.9100       7.7        42       109        60
OIR    2025250     91400   21.7000 -108.9200       7.6        42       109        60
OIR    2025250     91400   21.7000 -108.9300       7.6        42       109        60
OIR    2025250     91400   21.7000 -108.9400       7.6        42       109        60
OIR    2025250     91400   21.7000 -108.9500       7.6        42       109        60
OIR    2025250     91400   21.7000 -108.9600       7.6        42       110        60
OIR    2025250     91400   21.7000 -108.9700       7.6        42       111        60
OIR    2025250     91400   21.7000 -108.9800       7.6        42       111        60
OIR    2025250     91400   21.7000 -108.9900       7.6        42       112        60
OIR    2025250     91400   21.7000 -109.0000       7.6        42       112        60
OIR    2025250     91400   21.7000 -109.0100       7.6        42       113        60
OIR    2025250     91400   21.7000 -109.0200       7.6        42       114        60
OIR    2025250     91400   21.7000 -109.0300       7.6        42       112        60
OIR    2025250     91400   21.7000 -109.0400       7.6        42       111        60
OIR    2025250     91400   21.7000 -109.0500       7.6        42       111        60
OIR    2025250     91400   21.7000 -109.0600       7.6        42       111        60
OIR    2025250     91400   21.7000 -109.0700       7.6        42       112        60
OIR    2025250     91400   21.7000 -109.0800       7.6        42       114        60
OIR    2025250     91400   21.7000 -109.0900       7.6        42       115        60
OIR    2025250     91400   21.7000 -109.1000       7.5        42       116        60
OIR    2025250     91400   21.7000 -109.1100       7.5        42       116        60
OIR    2025250     91400   21.7000 -109.1200       7.5        42       116        60
OIR    2025250     91400   21.7000 -109.1300       7.5        42       115        60
OIR    2025250     91400   21.7000 -109.1400       7.5        42       113        60
OIR    2025250     91400   21.7000 -109.1500       7.5        42       113        60
OIR    2025250     91400   21.7000 -109.1600       7.5        42       112        60
OIR    2025250     91400   21.7000 -109.1700       7.5        42       112        60
OIR    2025250     91400   21.7000 -109.1800       7.5        42       114        60
OIR    2025250     91400   21.7000 -109.1900       7.4        42       116        60
OIR    2025250     91400   21.7000 -109.2000       7.4        42       116        60
OIR    2025250     91400   21.7000 -109.2100       7.4        42       114        60
OIR    2025250     91400   21.7000 -109.2200       7.4        42       113        60
OIR    2025250     91400   21.7000 -109.2300       7.4        42       115        60
OIR    2025250     91400   21.7000 -109.2400       7.4        42       116        60
OIR    2025250     91400   21.7000 -109.2500       7.3        42       116        60
OIR    2025250     91400   21.7000 -109.2600       7.3        42       115        60
OIR    2025250     91400   21.7000 -109.2700       7.3        42       116        60
OIR    2025250     91400   21.7000 -109.2800       7.3        42       116        60
OIR    2025250     91400   21.7000 -109.2900       7.3        42       119        60
OIR    2025250     91400   21.7000 -109.3000       7.3        42       119        60
OIR    2025250     91400   21.7000 -109.3100       7.2        42       117        60
OIR    2025250     91400   21.7000 -109.3200       7.2        42       116        60
OIR    2025250     91400   21.7000 -109.3300       7.2        42       116        60
OIR    2025250     91400   21.7000 -109.3400       7.2        42       116        60
OIR    2025250     91400   21.7000 -109.3500       7.2        42       116        60
OIR    2025250     91400   21.7000 -109.3600       7.1        42       119        60
OIR    2025250     91400   21.7000 -109.3700       7.1        42       121        60
OIR    2025250     91400   21.7000 -109.3800       7.1        42       122        60
OIR    2025250     91400   21.7000 -109.3900       7.1        42       122        60
OIR    2025250     91400   21.7000 -109.4000       7.0        42       121        60
OIR    2025250     91400   21.7000 -109.4100       7.0        43       119        60
OIR    2025250     91400   21.7000 -109.4200       6.9        43       116        60
OIR    2025250     91400   21.7000 -109.4300       6.8        43       115        60
OIR    2025250     91400   21.7000 -109.4400       6.7        43       113        60
OIR    2025250     91400   21.7000 -109.4500       6.7        43       114        60
OIR    2025250     91400   21.7000 -109.4600       6.6        43       116        60
OIR    2025250     91400   21.7000 -109.4700       6.6        43       116        60
OIR    2025250     91400   21.7000 -109.4800       6.5        43       115        60
OIR    2025250     91400   21.7000 -109.4900       6.5        43       114        60
OIR    2025250     91400   21.7000 -109.5000       6.4        43       113        60
OIR    2025250     91400   21.7000 -109.5100       6.4        43       113        60
OIR    2025250     91400   21.7000 -109.5200       6.3        43       113        60
OIR    2025250     91400   21.7000 -109.5300       6.2        43       112        60
OIR    2025250     91400   21.7000 -109.5400       6.1        43       111        60
OIR    2025250     91400   21.7000 -109.5500       6.0        43       111        60
OIR    2025250     91400   21.7000 -109.5600       5.9        43       112        60
OIR    2025250     91400   21.7000 -109.5700       5.7        43       112        60
OIR    2025250     91400   21.7000 -109.5800       5.3        43       111        60
OIR    2025250     91400   21.7000 -109.5900       4.8        44       110        60
OIR    2025250     91400   21.7000 -109.6000       4.3        45       110        60
OIR    2025250     91400   21.7000 -109.6100       4.0        46       110        60
OIR    2025250     91400   21.6900 -108.6100       7.6        41       104        60
OIR    2025250     91400   21.6900 -108.6200       7.6        41       104        60
OIR    2025250     91400   21.6900 -108.6300       7.6        41       104        60
OIR    2025250     91400   21.6900 -108.6400       7.6        41       104        60
OIR    2025250     91400   21.6900 -108.6500       7.6        41       105        60
OIR    2025250     91400   21.6900 -108.6600       7.6        41       107        60
OIR    2025250     91400   21.6900 -108.6700       7.6        41       107        60
OIR    2025250     91400   21.6900 -108.6800       7.6        41       107        60
OIR    2025250     91400   21.6900 -108.6900       7.6        41       107        60
OIR    2025250     91400   21.6900 -108.7000       7.6        41       107        60
OIR    2025250     91400   21.6900 -108.7100       7.6        41       107        60
OIR    2025250     91400   21.6900 -108.7200       7.6        42       108        60
OIR    2025250     91400   21.6900 -108.7300       7.6        42       107        60
OIR    2025250     91400   21.6900 -108.7400       7.6        42       105        60
OIR    2025250     91400   21.6900 -108.7500       7.7        42       105        60
OIR    2025250     91400   21.6900 -108.7600       7.7        42       104        60
OIR    2025250     91400   21.6900 -108.7700       7.7        42       104        60
OIR    2025250     91400   21.6900 -108.7800       7.7        42       104        60
OIR    2025250     91400   21.6900 -108.7900       7.7        42       104        60
OIR    2025250     91400   21.6900 -108.8000       7.7        42       104        60
OIR    2025250     91400   21.6900 -108.8100       7.7        42       105        60
OIR    2025250     91400   21.6900 -108.8200       7.7        42       105        60
OIR    2025250     91400   21.6900 -108.8300       7.7        42       105        60
OIR    2025250     91400   21.6900 -108.8400       7.7        42       107        60
OIR    2025250     91400   21.6900 -108.8500       7.7        42       108        60
OIR    2025250     91400   21.6900 -108.8600       7.7        42       108        60
OIR    2025250     91400   21.6900 -108.8700       7.7        42       109        60
OIR    2025250     91400   21.6900 -108.8800       7.7        42       109        60
OIR    2025250     91400   21.6900 -108.8900       7.7        42       108        60
OIR    2025250     91400   21.6900 -108.9000       7.7        42       107        60
OIR    2025250     91400   21.6900 -108.9100       7.7        42       108        60
OIR    2025250     91400   21.6900 -108.9200       7.7        42       108        60
OIR    2025250     91400   21.6900 -108.9300       7.7        42       108        60
OIR    2025250     91400   21.6900 -108.9400       7.6        42       109        60
OIR    2025250     91400   21.6900 -108.9500       7.6        42       109        60
OIR    2025250     91400   21.6900 -108.9600       7.6        42       111        60
OIR    2025250     91400   21.6900 -108.9700       7.6        42       112        60
OIR    2025250     91400   21.6900 -108.9800       7.6        42       113        60
OIR    2025250     91400   21.6900 -108.9900       7.6        42       113        60
OIR    2025250     91400   21.6900 -109.0000       7.6        42       113        60
OIR    2025250     91400   21.6900 -109.0100       7.6        42       112        60
OIR    2025250     91400   21.6900 -109.0200       7.6        42       112        60
OIR    2025250     91400   21.6900 -109.0300       7.6        42       112        60
OIR    2025250     91400   21.6900 -109.0400       7.6        42       112        60
OIR    2025250     91400   21.6900 -109.0500       7.6        42       112        60
OIR    2025250     91400   21.6900 -109.0600       7.6        42       112        60
OIR    2025250     91400   21.6900 -109.0700       7.6        42       112        60
OIR    2025250     91400   21.6900 -109.0800       7.6        42       113        60
OIR    2025250     91400   21.6900 -109.0900       7.6        42       116        60
OIR    2025250     91400   21.6900 -109.1000       7.6        42       116        60
OIR    2025250     91400   21.6900 -109.1100       7.5        42       116        60
OIR    2025250     91400   21.6900 -109.1200       7.5        42       117        60
OIR    2025250     91400   21.6900 -109.1300       7.5        42       116        60
OIR    2025250     91400   21.6900 -109.1400       7.5        42       113        60
OIR    2025250     91400   21.6900 -109.1500       7.5        42       112        60
OIR    2025250     91400   21.6900 -109.1600       7.5        42       112        60
OIR    2025250     91400   21.6900 -109.1700       7.5        42       112        60
OIR    2025250     91400   21.6900 -109.1800       7.5        42       113        60
OIR    2025250     91400   21.6900 -109.1900       7.5        42       115        60
OIR    2025250     91400   21.6900 -109.2000       7.4        42       116        60
OIR    2025250     91400   21.6900 -109.2100       7.4        42       115        60
OIR    2025250     91400   21.6900 -109.2200       7.4        42       114        60
OIR    2025250     91400   21.6900 -109.2300       7.4        42       116        60
OIR    2025250     91400   21.6900 -109.2400       7.4        42       116        60
OIR    2025250     91400   21.6900 -109.2500       7.4        42       117        60
OIR    2025250     91400   21.6900 -109.2600       7.3        42       116        60
OIR    2025250     91400   21.6900 -109.2700       7.3        42       115        60
OIR    2025250     91400   21.6900 -109.2800       7.3        42       116        60
OIR    2025250     91400   21.6900 -109.2900       7.3        42       117        60
OIR    2025250     91400   21.6900 -109.3000       7.3        42       119        60
OIR    2025250     91400   21.6900 -109.3100       7.2        42       117        60
OIR    2025250     91400   21.6900 -109.3200       7.2        42       116        60
OIR    2025250     91400   21.6900 -109.3300       7.2        42       116        60
OIR    2025250     91400   21.6900 -109.3400       7.2        42       116        60
OIR    2025250     91400   21.6900 -109.3500       7.2        42       116        60
OIR    2025250     91400   21.6900 -109.3600       7.1        42       117        60
OIR    2025250     91400   21.6900 -109.3700       7.1        42       120        60
OIR    2025250     91400   21.6900 -109.3800       7.1        42       120        60
OIR    2025250     91400   21.6900 -109.3900       7.1        43       121        60
OIR    2025250     91400   21.6900 -109.4000       7.0        43       120        60
OIR    2025250     91400   21.6900 -109.4100       6.9        43       117        60
OIR    2025250     91400   21.6900 -109.4200       6.8        43       116        60
OIR    2025250     91400   21.6900 -109.4300       6.7        43       115        60
OIR    2025250     91400   21.6900 -109.4400       6.7        43       114        60
OIR    2025250     91400   21.6900 -109.4500       6.6        43       114        60
OIR    2025250     91400   21.6900 -109.4600       6.6        43       115        60
OIR    2025250     91400   21.6900 -109.4700       6.5        43       115        60
OIR    2025250     91400   21.6900 -109.4800       6.5        43       114        60
OIR    2025250     91400   21.6900 -109.4900       6.4        43       113        60
OIR    2025250     91400   21.6900 -109.5000       6.4        43       112        60
OIR    2025250     91400   21.6900 -109.5100       6.3        43       112        60
OIR    2025250     91400   21.6900 -109.5200       6.2        43       112        60
OIR    2025250     91400   21.6900 -109.5300       6.1        43       112        60
OIR    2025250     91400   21.6900 -109.5400       6.0        43       112        60
OIR    2025250     91400   21.6900 -109.5500       5.9        43       111        60
OIR    2025250     91400   21.6900 -109.5600       5.8        43       112        60
OIR    2025250     91400   21.6900 -109.5700       5.6        43       112        60
OIR    2025250     91400   21.6900 -109.5800       5.2        44       112        60
OIR    2025250     91400   21.6900 -109.5900       4.7        44       111        60
OIR    2025250     91400   21.6900 -109.6000       4.2        45       111        60
OIR    2025250     91400   21.6800 -108.6100       7.6        42       104        60
OIR    2025250     91400   21.6800 -108.6200       7.6        42       105        60
OIR    2025250     91400   21.6800 -108.6300       7.6        42       105        60
OIR    2025250     91400   21.6800 -108.6400       7.6        42       104        60
OIR    2025250     91400   21.6800 -108.6500       7.6        42       104        60
OIR    2025250     91400   21.6800 -108.6600       7.6        42       104        60
OIR    2025250     91400   21.6800 -108.6700       7.6        42       105        60
OIR    2025250     91400   21.6800 -108.6800       7.6        42       105        60
OIR    2025250     91400   21.6800 -108.6900       7.6        42       105        60
OIR    2025250     91400   21.6800 -108.7000       7.6        42       105        60
OIR    2025250     91400   21.6800 -108.7100       7.6        42       105        60
OIR    2025250     91400   21.6800 -108.7200       7.6        42       105        60
OIR    2025250     91400   21.6800 -108.7300       7.6        42       104        60
OIR    2025250     91400   21.6800 -108.7400       7.6        42       104        60
OIR    2025250     91400   21.6800 -108.7500       7.6        42       104        60
OIR    2025250     91400   21.6800 -108.7600       7.7        42       104        60
OIR    2025250     91400   21.6800 -108.7700       7.7        42       104        60
OIR    2025250     91400   21.6800 -108.7800       7.7        42       104        60
OIR    2025250     91400   21.6800 -108.7900       7.7        42       104        60
OIR    2025250     91400   21.6800 -108.8000       7.7        42       104        60
OIR    2025250     91400   21.6800 -108.8100       7.7        42       104        60
OIR    2025250     91400   21.6800 -108.8200       7.7        42       104        60
OIR    2025250     91400   21.6800 -108.8300       7.7        42       105        60
OIR    2025250     91400   21.6800 -108.8400       7.7        42       105        60
OIR    2025250     91400   21.6800 -108.8500       7.7        42       107        60
OIR    2025250     91400   21.6800 -108.8600       7.7        42       107        60
OIR    2025250     91400   21.6800 -108.8700       7.7        42       107        60
OIR    2025250     91400   21.6800 -108.8800       7.7        42       108        60
OIR    2025250     91400   21.6800 -108.8900       7.7        42       107        60
OIR    2025250     91400   21.6800 -108.9000       7.7        42       107        60
OIR    2025250     91400   21.6800 -108.9100       7.7        42       107        60
OIR    2025250     91400   21.6800 -108.9200       7.7        42       108        60
OIR    2025250     91400   21.6800 -108.9300       7.7        42       108        60
OIR    2025250     91400   21.6800 -108.9400       7.7        42       108        60
OIR    2025250     91400   21.6800 -108.9500       7.7        42       109        60
OIR    2025250     91400   21.6800 -108.9600       7.6        42       110        60
OIR    2025250     91400   21.6800 -108.9700       7.6        42       111        60
OIR    2025250     91400   21.6800 -108.9800       7.6        42       112        60
OIR    2025250     91400   21.6800 -108.9900       7.6        42       112        60
OIR    2025250     91400   21.6800 -109.0000       7.6        42       113        60
OIR    2025250     91400   21.6800 -109.0100       7.6        42       111        60
OIR    2025250     91400   21.6800 -109.0200       7.6        42       110        60
OIR    2025250     91400   21.6800 -109.0300       7.6        42       111        60
OIR    2025250     91400   21.6800 -109.0400       7.6        42       112        60
OIR    2025250     91400   21.6800 -109.0500       7.6        42       113        60
OIR    2025250     91400   21.6800 -109.0600       7.6        42       112        60
OIR    2025250     91400   21.6800 -109.0700       7.6        42       112        60
OIR    2025250     91400   21.6800 -109.0800       7.6        42       113        60
OIR    2025250     91400   21.6800 -109.0900       7.6        42       116        60
OIR    2025250     91400   21.6800 -109.1000       7.6        42       117        60
OIR    2025250     91400   21.6800 -109.1100       7.6        42       119        60
OIR    2025250     91400   21.6800 -109.1200       7.5        42       119        60
OIR    2025250     91400   21.6800 -109.1300       7.5        42       116        60
OIR    2025250     91400   21.6800 -109.1400       7.5        42       113        60
OIR    2025250     91400   21.6800 -109.1500       7.5        42       111        60
OIR    2025250     91400   21.6800 -109.1600       7.5        42       112        60
OIR    2025250     91400   21.6800 -109.1700       7.5        42       112        60
OIR    2025250     91400   21.6800 -109.1800       7.5        42       113        60
OIR    2025250     91400   21.6800 -109.1900       7.5        42       113        60
OIR    2025250     91400   21.6800 -109.2000       7.4        42       114        60
OIR    2025250     91400   21.6800 -109.2100       7.4        42       115        60
OIR    2025250     91400   21.6800 -109.2200       7.4        42       116        60
OIR    2025250     91400   21.6800 -109.2300       7.4        42       116        60
OIR    2025250     91400   21.6800 -109.2400       7.4        42       117        60
OIR    2025250     91400   21.6800 -109.2500       7.4        42       117        60
OIR    2025250     91400   21.6800 -109.2600       7.3        42       116        60
OIR    2025250     91400   21.6800 -109.2700       7.3        42       115        60
OIR    2025250     91400   21.6800 -109.2800       7.3        42       116        60
OIR    2025250     91400   21.6800 -109.2900       7.3        42       116        60
OIR    2025250     91400   21.6800 -109.3000       7.3        42       117        60
OIR    2025250     91400   21.6800 -109.3100       7.2        42       117        60
OIR    2025250     91400   21.6800 -109.3200       7.2        42       117        60
OIR    2025250     91400   21.6800 -109.3300       7.2        42       117        60
OIR    2025250     91400   21.6800 -109.3400       7.2        42       120        60
OIR    2025250     91400   21.6800 -109.3500       7.2        42       121        60
OIR    2025250     91400   21.6800 -109.3600       7.1        43       120        60
OIR    2025250     91400   21.6800 -109.3700       7.1        43       119        60
OIR    2025250     91400   21.6800 -109.3800       7.1        43       117        60
OIR    2025250     91400   21.6800 -109.3900       7.0        43       119        60
OIR    2025250     91400   21.6800 -109.4000       6.9        43       117        60
OIR    2025250     91400   21.6800 -109.4100       6.8        43       116        60
OIR    2025250     91400   21.6800 -109.4200       6.8        43       116        60
OIR    2025250     91400   21.6800 -109.4300       6.7        43       115        60
OIR    2025250     91400   21.6800 -109.4400       6.6        43       114        60
OIR    2025250     91400   21.6800 -109.4500       6.6        44       113        60
OIR    2025250     91400   21.6800 -109.4600       6.5        43       114        60
OIR    2025250     91400   21.6800 -109.4700       6.5        43       114        60
OIR    2025250     91400   21.6800 -109.4800       6.4        43       113        60
OIR    2025250     91400   21.6800 -109.4900       6.4        43       113        60
OIR    2025250     91400   21.6800 -109.5000       6.3        43       112        60
OIR    2025250     91400   21.6800 -109.5100       6.3        43       112        60
OIR    2025250     91400   21.6800 -109.5200       6.2        43       112        60
OIR    2025250     91400   21.6800 -109.5300       6.1        44       112        60
OIR    2025250     91400   21.6800 -109.5400       6.0        43       112        60
OIR    2025250     91400   21.6800 -109.5500       5.9        43       111        60
OIR    2025250     91400   21.6800 -109.5600       5.8        44       112        60
OIR    2025250     91400   21.6800 -109.5700       5.5        44       112        60
OIR    2025250     91400   21.6800 -109.5800       5.1        44       112        60
OIR    2025250     91400   21.6800 -109.5900       4.6        45       112        60
OIR    2025250     91400   21.6800 -109.6000       4.1        46       112        60
OIR    2025250     91400   21.6700 -108.6100       7.6        42       104        60
OIR    2025250     91400   21.6700 -108.6200       7.6        42       104        60
OIR    2025250     91400   21.6700 -108.6300       7.6        42       105        60
OIR    2025250     91400   21.6700 -108.6400       7.6        42       104        60
OIR    2025250     91400   21.6700 -108.6500       7.6        42       104        60
OIR    2025250     91400   21.6700 -108.6600       7.6        42       104        60
OIR    2025250     91400   21.6700 -108.6700       7.6        42       104        60
OIR    2025250     91400   21.6700 -108.6800       7.6        42       105        60
OIR    2025250     91400   21.6700 -108.6900       7.6        42       105        60
OIR    2025250     91400   21.6700 -108.7000       7.6        42       105        60
OIR    2025250     91400   21.6700 -108.7100       7.6        42       105        60
OIR    2025250     91400   21.6700 -108.7200       7.6        42       104        60
OIR    2025250     91400   21.6700 -108.7300       7.6        42       104        60
OIR    2025250     91400   21.6700 -108.7400       7.6        42       104        60
OIR    2025250     91400   21.6700 -108.7500       7.6        42       104        60
OIR    2025250     91400   21.6700 -108.7600       7.7        42       104        60
OIR    2025250     91400   21.6700 -108.7700       7.7        42       104        60
OIR    2025250     91400   21.6700 -108.7800       7.7        42       104        60
OIR    2025250     91400   21.6700 -108.7900       7.7        42       104        60
OIR    2025250     91400   21.6700 -108.8000       7.7        42       104        60
OIR    2025250     91400   21.6700 -108.8100       7.7        42       104        60
OIR    2025250     91400   21.6700 -108.8200       7.7        42       104        60
OIR    2025250     91400   21.6700 -108.8300       7.7        42       104        60
OIR    2025250     91400   21.6700 -108.8400       7.7        42       104        60
OIR    2025250     91400   21.6700 -108.8500       7.7        42       105        60
OIR    2025250     91400   21.6700 -108.8600       7.7        42       105        60
OIR    2025250     91400   21.6700 -108.8700       7.7        42       105        60
OIR    2025250     91400   21.6700 -108.8800       7.7        42       105        60
OIR    2025250     91400   21.6700 -108.8900       7.7        42       105        60
OIR    2025250     91400   21.6700 -108.9000       7.7        42       107        60
OIR    2025250     91400   21.6700 -108.9100       7.7        42       107        60
OIR    2025250     91400   21.6700 -108.9200       7.7        42       107        60
OIR    2025250     91400   21.6700 -108.9300       7.7        42       107        60
OIR    2025250     91400   21.6700 -108.9400       7.7        42       108        60
OIR    2025250     91400   21.6700 -108.9500       7.7        42       109        60
OIR    2025250     91400   21.6700 -108.9600       7.7        42       109        60
OIR    2025250     91400   21.6700 -108.9700       7.6        42       110        60
OIR    2025250     91400   21.6700 -108.9800       7.6        42       110        60
OIR    2025250     91400   21.6700 -108.9900       7.6        42       110        60
OIR    2025250     91400   21.6700 -109.0000       7.6        42       110        60
OIR    2025250     91400   21.6700 -109.0100       7.6        42       110        60
OIR    2025250     91400   21.6700 -109.0200       7.6        42       109        60
OIR    2025250     91400   21.6700 -109.0300       7.6        42       109        60
OIR    2025250     91400   21.6700 -109.0400       7.6        42       111        60
OIR    2025250     91400   21.6700 -109.0500       7.6        42       113        60
OIR    2025250     91400   21.6700 -109.0600       7.6        42       113        60
OIR    2025250     91400   21.6700 -109.0700       7.6        42       113        60
OIR    2025250     91400   21.6700 -109.0800       7.6        42       113        60
OIR    2025250     91400   21.6700 -109.0900       7.6        42       116        60
OIR    2025250     91400   21.6700 -109.1000       7.6        42       117        60
OIR    2025250     91400   21.6700 -109.1100       7.6        42       116        60
OIR    2025250     91400   21.6700 -109.1200       7.6        42       116        60
OIR    2025250     91400   21.6700 -109.1300       7.5        42       116        60
OIR    2025250     91400   21.6700 -109.1400       7.5        42       114        60
OIR    2025250     91400   21.6700 -109.1500       7.5        42       112        60
OIR    2025250     91400   21.6700 -109.1600       7.5        42       112        60
OIR    2025250     91400   21.6700 -109.1700       7.5        42       112        60
OIR    2025250     91400   21.6700 -109.1800       7.5        42       113        60
OIR    2025250     91400   21.6700 -109.1900       7.5        42       113        60
OIR    2025250     91400   21.6700 -109.2000       7.5        42       113        60
OIR    2025250     91400   21.6700 -109.2100       7.4        42       114        60
OIR    2025250     91400   21.6700 -109.2200       7.4        42       116        60
OIR    2025250     91400   21.6700 -109.2300       7.4        42       116        60
OIR    2025250     91400   21.6700 -109.2400       7.4        42       117        60
OIR    2025250     91400   21.6700 -109.2500       7.4        42       119        60
OIR    2025250     91400   21.6700 -109.2600       7.3        42       117        60
OIR    2025250     91400   21.6700 -109.2700       7.3        42       116        60
OIR    2025250     91400   21.6700 -109.2800       7.3        42       115        60
OIR    2025250     91400   21.6700 -109.2900       7.3        42       116        60
OIR    2025250     91400   21.6700 -109.3000       7.3        42       117        60
OIR    2025250     91400   21.6700 -109.3100       7.2        42       117        60
OIR    2025250     91400   21.6700 -109.3200       7.2        42       117        60
OIR    2025250     91400   21.6700 -109.3300       7.2        43       119        60
OIR    2025250     91400   21.6700 -109.3400       7.2        43       121        60
OIR    2025250     91400   21.6700 -109.3500       7.2        43       124        60
OIR    2025250     91400   21.6700 -109.3600       7.1        43       122        60
OIR    2025250     91400   21.6700 -109.3700       7.1        43       119        60
OIR    2025250     91400   21.6700 -109.3800       7.1        43       116        60
OIR    2025250     91400   21.6700 -109.3900       7.0        43       116        60
OIR    2025250     91400   21.6700 -109.4000       6.9        43       116        60
OIR    2025250     91400   21.6700 -109.4100       6.8        44       116        60
OIR    2025250     91400   21.6700 -109.4200       6.7        44       116        60
OIR    2025250     91400   21.6700 -109.4300       6.6        44       116        60
OIR    2025250     91400   21.6700 -109.4400       6.6        44       114        60
OIR    2025250     91400   21.6700 -109.4500       6.5        44       113        60
OIR    2025250     91400   21.6700 -109.4600       6.5        44       113        60
OIR    2025250     91400   21.6700 -109.4700       6.5        44       113        60
OIR    2025250     91400   21.6700 -109.4800       6.4        44       112        60
OIR    2025250     91400   21.6700 -109.4900       6.4        44       112        60
OIR    2025250     91400   21.6700 -109.5000       6.3        44       112        60
OIR    2025250     91400   21.6700 -109.5100       6.2        44       112        60
OIR    2025250     91400   21.6700 -109.5200       6.2        44       113        60
OIR    2025250     91400   21.6700 -109.5300       6.1        44       112        60
OIR    2025250     91400   21.6700 -109.5400       6.0        44       112        60
OIR    2025250     91400   21.6700 -109.5500       5.9        44       111        60
OIR    2025250     91400   21.6700 -109.5600       5.7        44       111        60
OIR    2025250     91400   21.6700 -109.5700       5.5        44       111        60
OIR    2025250     91400   21.6700 -109.5800       5.0        44       112        60
OIR    2025250     91400   21.6700 -109.5900       4.5        45       113        60
OIR    2025250     91400   21.6700 -109.6000       4.0        46       113        60
OIR    2025250     91400   21.6600 -108.6100       7.6        42       104        60
OIR    2025250     91400   21.6600 -108.6200       7.6        42       104        60
OIR    2025250     91400   21.6600 -108.6300       7.6        42       104        60
OIR    2025250     91400   21.6600 -108.6400       7.6        42       104        60
OIR    2025250     91400   21.6600 -108.6500       7.6        42       104        60
OIR    2025250     91400   21.6600 -108.6600       7.6        42       104        60
OIR    2025250     91400   21.6600 -108.6700       7.6        42       104        60
OIR    2025250     91400   21.6600 -108.6800       7.6        42       105        60
OIR    2025250     91400   21.6600 -108.6900       7.6        42       105        60
OIR    2025250     91400   21.6600 -108.7000       7.6        42       107        60
OIR    2025250     91400   21.6600 -108.7100       7.6        42       107        60
OIR    2025250     91400   21.6600 -108.7200       7.6        42       105        60
OIR    2025250     91400   21.6600 -108.7300       7.6        42       104        60
OIR    2025250     91400   21.6600 -108.7400       7.6        42       104        60
OIR    2025250     91400   21.6600 -108.7500       7.6        42       104        60
OIR    2025250     91400   21.6600 -108.7600       7.6        42       103        60
OIR    2025250     91400   21.6600 -108.7700       7.7        42       103        60
OIR    2025250     91400   21.6600 -108.7800       7.7        42       103        60
OIR    2025250     91400   21.6600 -108.7900       7.7        42       104        60
OIR    2025250     91400   21.6600 -108.8000       7.7        42       104        60
OIR    2025250     91400   21.6600 -108.8100       7.7        42       104        60
OIR    2025250     91400   21.6600 -108.8200       7.7        42       104        60
OIR    2025250     91400   21.6600 -108.8300       7.7        42       104        60
OIR    2025250     91400   21.6600 -108.8400       7.7        42       105        60
OIR    2025250     91400   21.6600 -108.8500       7.7        42       107        60
OIR    2025250     91400   21.6600 -108.8600       7.7        42       107        60
OIR    2025250     91400   21.6600 -108.8700       7.7        42       107        60
OIR    2025250     91400   21.6600 -108.8800       7.7        42       105        60
OIR    2025250     91400   21.6600 -108.8900       7.7        42       105        60
OIR    2025250     91400   21.6600 -108.9000       7.7        42       107        60
OIR    2025250     91400   21.6600 -108.9100       7.7        42       107        60
OIR    2025250     91400   21.6600 -108.9200       7.7        42       107        60
OIR    2025250     91400   21.6600 -108.9300       7.7        42       107        60
OIR    2025250     91400   21.6600 -108.9400       7.7        42       108        60
OIR    2025250     91400   21.6600 -108.9500       7.7        42       109        60
OIR    2025250     91400   21.6600 -108.9600       7.7        42       109        60
OIR    2025250     91400   21.6600 -108.9700       7.6        42       109        60
OIR    2025250     91400   21.6600 -108.9800       7.6        42       109        60
OIR    2025250     91400   21.6600 -108.9900       7.6        42       109        60
OIR    2025250     91400   21.6600 -109.0000       7.6        42       109        60
OIR    2025250     91400   21.6600 -109.0100       7.6        42       108        60
OIR    2025250     91400   21.6600 -109.0200       7.6        42       108        60
OIR    2025250     91400   21.6600 -109.0300       7.6        42       109        60
OIR    2025250     91400   21.6600 -109.0400       7.6        42       110        60
OIR    2025250     91400   21.6600 -109.0500       7.6        42       113        60
OIR    2025250     91400   21.6600 -109.0600       7.6        42       114        60
OIR    2025250     91400   21.6600 -109.0700       7.6        42       114        60
OIR    2025250     91400   21.6600 -109.0800       7.6        42       114        60
OIR    2025250     91400   21.6600 -109.0900       7.6        42       116        60
OIR    2025250     91400   21.6600 -109.1000       7.6        42       117        60
OIR    2025250     91400   21.6600 -109.1100       7.6        42       116        60
OIR    2025250     91400   21.6600 -109.1200       7.6        42       115        60
OIR    2025250     91400   21.6600 -109.1300       7.6        42       114        60
OIR    2025250     91400   21.6600 -109.1400       7.6        42       113        60
OIR    2025250     91400   21.6600 -109.1500       7.5        42       113        60
OIR    2025250     91400   21.6600 -109.1600       7.5        42       113        60
OIR    2025250     91400   21.6600 -109.1700       7.5        42       113        60
OIR    2025250     91400   21.6600 -109.1800       7.5        42       113        60
OIR    2025250     91400   21.6600 -109.1900       7.5        42       113        60
OIR    2025250     91400   21.6600 -109.2000       7.5        42       113        60
OIR    2025250     91400   21.6600 -109.2100       7.5        42       114        60
OIR    2025250     91400   21.6600 -109.2200       7.4        42       116        60
OIR    2025250     91400   21.6600 -109.2300       7.4        42       116        60
OIR    2025250     91400   21.6600 -109.2400       7.4        42       117        60
OIR    2025250     91400   21.6600 -109.2500       7.4        42       119        60
OIR    2025250     91400   21.6600 -109.2600       7.3        42       119        60
OIR    2025250     91400   21.6600 -109.2700       7.3        42       116        60
OIR    2025250     91400   21.6600 -109.2800       7.3        42       115        60
OIR    2025250     91400   21.6600 -109.2900       7.3        42       116        60
OIR    2025250     91400   21.6600 -109.3000       7.3        42       117        60
OIR    2025250     91400   21.6600 -109.3100       7.2        43       119        60
OIR    2025250     91400   21.6600 -109.3200       7.2        43       119        60
OIR    2025250     91400   21.6600 -109.3300       7.2        43       119        60
OIR    2025250     91400   21.6600 -109.3400       7.2        43       121        60
OIR    2025250     91400   21.6600 -109.3500       7.2        43       123        60
OIR    2025250     91400   21.6600 -109.3600       7.1        43       123        60
OIR    2025250     91400   21.6600 -109.3700       7.1        43       121        60
OIR    2025250     91400   21.6600 -109.3800       7.0        43       119        60
OIR    2025250     91400   21.6600 -109.3900       6.9        44       117        60
OIR    2025250     91400   21.6600 -109.4000       6.8        44       116        60
OIR    2025250     91400   21.6600 -109.4100       6.7        44       115        60
OIR    2025250     91400   21.6600 -109.4200       6.6        44       115        60
OIR    2025250     91400   21.6600 -109.4300       6.6        44       115        60
OIR    2025250     91400   21.6600 -109.4400       6.6        44       114        60
OIR    2025250     91400   21.6600 -109.4500       6.5        44       113        60
OIR    2025250     91400   21.6600 -109.4600       6.5        44       112        60
OIR    2025250     91400   21.6600 -109.4700       6.5        44       112        60
OIR    2025250     91400   21.6600 -109.4800       6.4        44       112        60
OIR    2025250     91400   21.6600 -109.4900       6.3        44       112        60
OIR    2025250     91400   21.6600 -109.5000       6.3        44       112        60
OIR    2025250     91400   21.6600 -109.5100       6.2        44       112        60
OIR    2025250     91400   21.6600 -109.5200       6.1        44       113        60
OIR    2025250     91400   21.6600 -109.5300       6.1        44       114        60
OIR    2025250     91400   21.6600 -109.5400       6.0        44       112        60
OIR    2025250     91400   21.6600 -109.5500       5.9        44       111        60
OIR    2025250     91400   21.6600 -109.5600       5.7        44       111        60
OIR    2025250     91400   21.6600 -109.5700       5.4        44       111        60
OIR    2025250     91400   21.6600 -109.5800       4.9        45       111        60
OIR    2025250     91400   21.6600 -109.5900       4.4        46       112        60
OIR    2025250     91400   21.6500 -108.6100       7.6        42       104        60
OIR    2025250     91400   21.6500 -108.6200       7.6        42       104        60
OIR    2025250     91400   21.6500 -108.6300       7.6        42       104        60
OIR    2025250     91400   21.6500 -108.6400       7.6        42       104        60
OIR    2025250     91400   21.6500 -108.6500       7.6        42       104        60
OIR    2025250     91400   21.6500 -108.6600       7.6        42       104        60
OIR    2025250     91400   21.6500 -108.6700       7.6        42       104        60
OIR    2025250     91400   21.6500 -108.6800       7.6        42       104        60
OIR    2025250     91400   21.6500 -108.6900       7.6        42       105        60
OIR    2025250     91400   21.6500 -108.7000       7.6        42       105        60
OIR    2025250     91400   21.6500 -108.7100       7.6        42       107        60
OIR    2025250     91400   21.6500 -108.7200       7.6        42       105        60
OIR    2025250     91400   21.6500 -108.7300       7.6        42       104        60
OIR    2025250     91400   21.6500 -108.7400       7.6        42       104        60
OIR    2025250     91400   21.6500 -108.7500       7.6        42       104        60
OIR    2025250     91400   21.6500 -108.7600       7.6        42       103        60
OIR    2025250     91400   21.6500 -108.7700       7.6        42       103        60
OIR    2025250     91400   21.6500 -108.7800       7.7        42       103        60
OIR    2025250     91400   21.6500 -108.7900       7.7        42       104        60
OIR    2025250     91400   21.6500 -108.8000       7.7        42       104        60
OIR    2025250     91400   21.6500 -108.8100       7.7        42       104        60
OIR    2025250     91400   21.6500 -108.8200       7.7        42       104        60
OIR    2025250     91400   21.6500 -108.8300       7.7        42       105        60
OIR    2025250     91400   21.6500 -108.8400       7.7        42       107        60
OIR    2025250     91400   21.6500 -108.8500       7.7        42       108        60
OIR    2025250     91400   21.6500 -108.8600       7.7        42       109        60
OIR    2025250     91400   21.6500 -108.8700       7.7        42       108        60
OIR    2025250     91400   21.6500 -108.8800       7.7        42       107        60
OIR    2025250     91400   21.6500 -108.8900       7.7        42       107        60
OIR    2025250     91400   21.6500 -108.9000       7.7        42       107        60
OIR    2025250     91400   21.6500 -108.9100       7.7        42       107        60
OIR    2025250     91400   21.6500 -108.9200       7.7        42       108        60
OIR    2025250     91400   21.6500 -108.9300       7.7        42       108        60
OIR    2025250     91400   21.6500 -108.9400       7.7        42       109        60
OIR    2025250     91400   21.6500 -108.9500       7.7        42       110        60
OIR    2025250     91400   21.6500 -108.9600       7.7        42       110        60
OIR    2025250     91400   21.6500 -108.9700       7.6        42       109        60
OIR    2025250     91400   21.6500 -108.9800       7.6        42       108        60
OIR    2025250     91400   21.6500 -108.9900       7.6        42       108        60
OIR    2025250     91400   21.6500 -109.0000       7.6        42       108        60
OIR    2025250     91400   21.6500 -109.0100       7.6        42       108        60
OIR    2025250     91400   21.6500 -109.0200       7.6        42       109        60
OIR    2025250     91400   21.6500 -109.0300       7.6        42       109        60
OIR    2025250     91400   21.6500 -109.0400       7.6        42       110        60
OIR    2025250     91400   21.6500 -109.0500       7.6        42       112        60
OIR    2025250     91400   21.6500 -109.0600       7.6        42       114        60
OIR    2025250     91400   21.6500 -109.0700       7.6        42       116        60
OIR    2025250     91400   21.6500 -109.0800       7.6        42       116        60
OIR    2025250     91400   21.6500 -109.0900       7.6        42       117        60
OIR    2025250     91400   21.6500 -109.1000       7.6        42       117        60
OIR    2025250     91400   21.6500 -109.1100       7.6        42       117        60
OIR    2025250     91400   21.6500 -109.1200       7.6        42       116        60
OIR    2025250     91400   21.6500 -109.1300       7.6        42       115        60
OIR    2025250     91400   21.6500 -109.1400       7.6        42       114        60
OIR    2025250     91400   21.6500 -109.1500       7.6        42       113        60
OIR    2025250     91400   21.6500 -109.1600       7.5        42       113        60
OIR    2025250     91400   21.6500 -109.1700       7.5        42       113        60
OIR    2025250     91400   21.6500 -109.1800       7.5        42       114        60
OIR    2025250     91400   21.6500 -109.1900       7.5        42       114        60
OIR    2025250     91400   21.6500 -109.2000       7.5        42       114        60
OIR    2025250     91400   21.6500 -109.2100       7.5        42       115        60
OIR    2025250     91400   21.6500 -109.2200       7.5        42       116        60
OIR    2025250     91400   21.6500 -109.2300       7.4        42       116        60
OIR    2025250     91400   21.6500 -109.2400       7.4        42       117        60
OIR    2025250     91400   21.6500 -109.2500       7.4        43       117        60
OIR    2025250     91400   21.6500 -109.2600       7.4        43       119        60
OIR    2025250     91400   21.6500 -109.2700       7.3        43       117        60
OIR    2025250     91400   21.6500 -109.2800       7.3        43       116        60
OIR    2025250     91400   21.6500 -109.2900       7.3        43       116        60
OIR    2025250     91400   21.6500 -109.3000       7.3        43       119        60
OIR    2025250     91400   21.6500 -109.3100       7.3        43       120        60
OIR    2025250     91400   21.6500 -109.3200       7.2        43       120        60
OIR    2025250     91400   21.6500 -109.3300       7.2        43       120        60
OIR    2025250     91400   21.6500 -109.3400       7.2        43       120        60
OIR    2025250     91400   21.6500 -109.3500       7.1        43       122        60
OIR    2025250     91400   21.6500 -109.3600       7.1        43       123        60
OIR    2025250     91400   21.6500 -109.3700       7.0        43       122        60
OIR    2025250     91400   21.6500 -109.3800       7.0        44       122        60
OIR    2025250     91400   21.6500 -109.3900       6.9        44       119        60
OIR    2025250     91400   21.6500 -109.4000       6.8        44       116        60
OIR    2025250     91400   21.6500 -109.4100       6.7        44       115        60
OIR    2025250     91400   21.6500 -109.4200       6.6        44       115        60
OIR    2025250     91400   21.6500 -109.4300       6.6        44       115        60
OIR    2025250     91400   21.6500 -109.4400       6.5        44       114        60
OIR    2025250     91400   21.6500 -109.4500       6.5        44       113        60
OIR    2025250     91400   21.6500 -109.4600       6.5        44       112        60
OIR    2025250     91400   21.6500 -109.4700       6.4        44       112        60
OIR    2025250     91400   21.6500 -109.4800       6.4        44       111        60
OIR    2025250     91400   21.6500 -109.4900       6.3        44       111        60
OIR    2025250     91400   21.6500 -109.5000       6.3        44       112        60
OIR    2025250     91400   21.6500 -109.5100       6.2        44       112        60
OIR    2025250     91400   21.6500 -109.5200       6.1        44       114        60
OIR    2025250     91400   21.6500 -109.5300       6.0        44       116        60
OIR    2025250     91400   21.6500 -109.5400       6.0        44       114        60
OIR    2025250     91400   21.6500 -109.5500       5.8        44       112        60
OIR    2025250     91400   21.6500 -109.5600       5.7        44       110        60
OIR    2025250     91400   21.6500 -109.5700       5.3        44       110        60
OIR    2025250     91400   21.6500 -109.5800       4.9        45       110        60
OIR    2025250     91400   21.6500 -109.5900       4.3        46       111        60
OIR    2025250     91400   21.6400 -108.6100       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.6200       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.6300       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.6400       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.6500       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.6600       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.6700       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.6800       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.6900       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.7000       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.7100       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.7200       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.7300       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.7400       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.7500       7.6        42       104        60
OIR    2025250     91400   21.6400 -108.7600       7.6        42       103        60
OIR    2025250     91400   21.6400 -108.7700       7.6        42       103        60
OIR    2025250     91400   21.6400 -108.7800       7.7        42       103        60
OIR    2025250     91400   21.6400 -108.7900       7.7        42       103        60
OIR    2025250     91400   21.6400 -108.8000       7.7        42       104        60
OIR    2025250     91400   21.6400 -108.8100       7.7        42       104        60
OIR    2025250     91400   21.6400 -108.8200       7.7        42       104        60
OIR    2025250     91400   21.6400 -108.8300       7.7        42       104        60
OIR    2025250     91400   21.6400 -108.8400       7.7        42       104        60
OIR    2025250     91400   21.6400 -108.8500       7.7        42       105        60
OIR    2025250     91400   21.6400 -108.8600       7.7        42       107        60
OIR    2025250     91400   21.6400 -108.8700       7.7        42       107        60
OIR    2025250     91400   21.6400 -108.8800       7.7        42       107        60
OIR    2025250     91400   21.6400 -108.8900       7.7        42       107        60
OIR    2025250     91400   21.6400 -108.9000       7.7        42       107        60
OIR    2025250     91400   21.6400 -108.9100       7.7        42       107        60
OIR    2025250     91400   21.6400 -108.9200       7.7        42       107        60
OIR    2025250     91400   21.6400 -108.9300       7.7        42       108        60
OIR    2025250     91400   21.6400 -108.9400       7.7        42       108        60
OIR    2025250     91400   21.6400 -108.9500       7.7        42       109        60
OIR    2025250     91400   21.6400 -108.9600       7.7        42       110        60
OIR    2025250     91400   21.6400 -108.9700       7.7        42       109        60
OIR    2025250     91400   21.6400 -108.9800       7.6        42       108        60
OIR    2025250     91400   21.6400 -108.9900       7.6        42       107        60
OIR    2025250     91400   21.6400 -109.0000       7.6        42       108        60
OIR    2025250     91400   21.6400 -109.0100       7.6        42       108        60
OIR    2025250     91400   21.6400 -109.0200       7.6        42       109        60
OIR    2025250     91400   21.6400 -109.0300       7.6        42       110        60
OIR    2025250     91400   21.6400 -109.0400       7.6        42       111        60
OIR    2025250     91400   21.6400 -109.0500       7.6        42       112        60
OIR    2025250     91400   21.6400 -109.0600       7.6        42       114        60
OIR    2025250     91400   21.6400 -109.0700       7.6        42       116        60
OIR    2025250     91400   21.6400 -109.0800       7.6        42       117        60
OIR    2025250     91400   21.6400 -109.0900       7.6        42       120        60
OIR    2025250     91400   21.6400 -109.1000       7.6        42       119        60
OIR    2025250     91400   21.6400 -109.1100       7.6        42       119        60
OIR    2025250     91400   21.6400 -109.1200       7.6        42       117        60
OIR    2025250     91400   21.6400 -109.1300       7.6        42       116        60
OIR    2025250     91400   21.6400 -109.1400       7.6        42       116        60
OIR    2025250     91400   21.6400 -109.1500       7.6        42       115        60
OIR    2025250     91400   21.6400 -109.1600       7.6        42       114        60
OIR    2025250     91400   21.6400 -109.1700       7.5        42       114        60
OIR    2025250     91400   21.6400 -109.1800       7.5        42       114        60
OIR    2025250     91400   21.6400 -109.1900       7.5        42       115        60
OIR    2025250     91400   21.6400 -109.2000       7.5        42       116        60
OIR    2025250     91400   21.6400 -109.2100       7.5        42       116        60
OIR    2025250     91400   21.6400 -109.2200       7.5        42       116        60
OIR    2025250     91400   21.6400 -109.2300       7.5        42       116        60
OIR    2025250     91400   21.6400 -109.2400       7.4        43       116        60
OIR    2025250     91400   21.6400 -109.2500       7.4        43       116        60
OIR    2025250     91400   21.6400 -109.2600       7.4        43       116        60
OIR    2025250     91400   21.6400 -109.2700       7.3        43       117        60
OIR    2025250     91400   21.6400 -109.2800       7.3        43       119        60
OIR    2025250     91400   21.6400 -109.2900       7.3        43       120        60
OIR    2025250     91400   21.6400 -109.3000       7.3        43       119        60
OIR    2025250     91400   21.6400 -109.3100       7.3        43       119        60
OIR    2025250     91400   21.6400 -109.3200       7.2        43       119        60
OIR    2025250     91400   21.6400 -109.3300       7.2        43       120        60
OIR    2025250     91400   21.6400 -109.3400       7.2        43       120        60
OIR    2025250     91400   21.6400 -109.3500       7.1        43       119        60
OIR    2025250     91400   21.6400 -109.3600       7.1        43       119        60
OIR    2025250     91400   21.6400 -109.3700       7.0        43       119        60
OIR    2025250     91400   21.6400 -109.3800       6.9        44       119        60
OIR    2025250     91400   21.6400 -109.3900       6.8        44       117        60
OIR    2025250     91400   21.6400 -109.4000       6.7        44       116        60
OIR    2025250     91400   21.6400 -109.4100       6.6        44       114        60
OIR    2025250     91400   21.6400 -109.4200       6.6        44       114        60
OIR    2025250     91400   21.6400 -109.4300       6.5        44       114        60
OIR    2025250     91400   21.6400 -109.4400       6.5        44       114        60
OIR    2025250     91400   21.6400 -109.4500       6.5        44       113        60
OIR    2025250     91400   21.6400 -109.4600       6.5        44       112        60
OIR    2025250     91400   21.6400 -109.4700       6.4        44       112        60
OIR    2025250     91400   21.6400 -109.4800       6.4        44       111        60
OIR    2025250     91400   21.6400 -109.4900       6.3        44       112        60
OIR    2025250     91400   21.6400 -109.5000       6.2        44       112        60
OIR    2025250     91400   21.6400 -109.5100       6.2        44       112        60
OIR    2025250     91400   21.6400 -109.5200       6.1        44       114        60
OIR    2025250     91400   21.6400 -109.5300       6.0        44       116        60
OIR    2025250     91400   21.6400 -109.5400       5.9        44       115        60
OIR    2025250     91400   21.6400 -109.5500       5.8        44       113        60
OIR    2025250     91400   21.6400 -109.5600       5.6        44       111        60
OIR    2025250     91400   21.6400 -109.5700       5.3        44       110        60
OIR    2025250     91400   21.6400 -109.5800       4.8        45       110        60
OIR    2025250     91400   21.6400 -109.5900       4.2        47       110        60
OIR    2025250     91400   21.6400 -115.1200      18.2       142       145        60
OIR    2025250     91400   21.6300 -108.6100       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.6200       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.6300       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.6400       7.6        42       105        60
OIR    2025250     91400   21.6300 -108.6500       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.6600       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.6700       7.6        42       103        60
OIR    2025250     91400   21.6300 -108.6800       7.6        42       103        60
OIR    2025250     91400   21.6300 -108.6900       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.7000       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.7100       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.7200       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.7300       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.7400       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.7500       7.6        42       104        60
OIR    2025250     91400   21.6300 -108.7600       7.6        42       103        60
OIR    2025250     91400   21.6300 -108.7700       7.6        42       103        60
OIR    2025250     91400   21.6300 -108.7800       7.6        42       103        60
OIR    2025250     91400   21.6300 -108.7900       7.7        42       103        60
OIR    2025250     91400   21.6300 -108.8000       7.7        42       104        60
OIR    2025250     91400   21.6300 -108.8100       7.7        42       104        60
OIR    2025250     91400   21.6300 -108.8200       7.7        43       104        60
OIR    2025250     91400   21.6300 -108.8300       7.7        43       104        60
OIR    2025250     91400   21.6300 -108.8400       7.7        43       104        60
OIR    2025250     91400   21.6300 -108.8500       7.7        43       104        60
OIR    2025250     91400   21.6300 -108.8600       7.7        43       104        60
OIR    2025250     91400   21.6300 -108.8700       7.7        43       104        60
OIR    2025250     91400   21.6300 -108.8800       7.7        43       105        60
OIR    2025250     91400   21.6300 -108.8900       7.7        43       107        60
OIR    2025250     91400   21.6300 -108.9000       7.7        42       107        60
OIR    2025250     91400   21.6300 -108.9100       7.7        42       107        60
OIR    2025250     91400   21.6300 -108.9200       7.7        42       107        60
OIR    2025250     91400   21.6300 -108.9300       7.7        42       107        60
OIR    2025250     91400   21.6300 -108.9400       7.7        42       107        60
OIR    2025250     91400   21.6300 -108.9500       7.7        42       107        60
OIR    2025250     91400   21.6300 -108.9600       7.7        42       108        60
OIR    2025250     91400   21.6300 -108.9700       7.7        42       108        60
OIR    2025250     91400   21.6300 -108.9800       7.6        42       107        60
OIR    2025250     91400   21.6300 -108.9900       7.6        42       107        60
OIR    2025250     91400   21.6300 -109.0000       7.6        42       107        60
OIR    2025250     91400   21.6300 -109.0100       7.6        42       107        60
OIR    2025250     91400   21.6300 -109.0200       7.6        42       108        60
OIR    2025250     91400   21.6300 -109.0300       7.6        42       110        60
OIR    2025250     91400   21.6300 -109.0400       7.6        42       111        60
OIR    2025250     91400   21.6300 -109.0500       7.6        42       112        60
OIR    2025250     91400   21.6300 -109.0600       7.6        42       114        60
OIR    2025250     91400   21.6300 -109.0700       7.6        42       115        60
OIR    2025250     91400   21.6300 -109.0800       7.6        42       115        60
OIR    2025250     91400   21.6300 -109.0900       7.6        42       116        60
OIR    2025250     91400   21.6300 -109.1000       7.6        42       116        60
OIR    2025250     91400   21.6300 -109.1100       7.6        42       117        60
OIR    2025250     91400   21.6300 -109.1200       7.6        42       117        60
OIR    2025250     91400   21.6300 -109.1300       7.6        42       116        60
OIR    2025250     91400   21.6300 -109.1400       7.6        42       115        60
OIR    2025250     91400   21.6300 -109.1500       7.6        42       114        60
OIR    2025250     91400   21.6300 -109.1600       7.6        42       113        60
OIR    2025250     91400   21.6300 -109.1700       7.6        42       112        60
OIR    2025250     91400   21.6300 -109.1800       7.5        42       113        60
OIR    2025250     91400   21.6300 -109.1900       7.5        42       114        60
OIR    2025250     91400   21.6300 -109.2000       7.5        42       114        60
OIR    2025250     91400   21.6300 -109.2100       7.5        42       115        60
OIR    2025250     91400   21.6300 -109.2200       7.5        42       116        60
OIR    2025250     91400   21.6300 -109.2300       7.5        43       116        60
OIR    2025250     91400   21.6300 -109.2400       7.4        43       116        60
OIR    2025250     91400   21.6300 -109.2500       7.4        43       116        60
OIR    2025250     91400   21.6300 -109.2600       7.4        43       116        60
OIR    2025250     91400   21.6300 -109.2700       7.4        43       116        60
OIR    2025250     91400   21.6300 -109.2800       7.3        43       120        60
OIR    2025250     91400   21.6300 -109.2900       7.3        43       122        60
OIR    2025250     91400   21.6300 -109.3000       7.3        43       120        60
OIR    2025250     91400   21.6300 -109.3100       7.2        43       117        60
OIR    2025250     91400   21.6300 -109.3200       7.2        43       117        60
OIR    2025250     91400   21.6300 -109.3300       7.2        43       119        60
OIR    2025250     91400   21.6300 -109.3400       7.2        43       120        60
OIR    2025250     91400   21.6300 -109.3500       7.1        43       117        60
OIR    2025250     91400   21.6300 -109.3600       7.0        43       116        60
OIR    2025250     91400   21.6300 -109.3700       6.9        44       116        60
OIR    2025250     91400   21.6300 -109.3800       6.8        44       116        60
OIR    2025250     91400   21.6300 -109.3900       6.7        44       116        60
OIR    2025250     91400   21.6300 -109.4000       6.7        44       115        60
OIR    2025250     91400   21.6300 -109.4100       6.6        44       114        60
OIR    2025250     91400   21.6300 -109.4200       6.6        44       114        60
OIR    2025250     91400   21.6300 -109.4300       6.5        44       114        60
OIR    2025250     91400   21.6300 -109.4400       6.5        44       114        60
OIR    2025250     91400   21.6300 -109.4500       6.5        44       113        60
OIR    2025250     91400   21.6300 -109.4600       6.4        44       112        60
OIR    2025250     91400   21.6300 -109.4700       6.4        44       112        60
OIR    2025250     91400   21.6300 -109.4800       6.3        44       112        60
OIR    2025250     91400   21.6300 -109.4900       6.3        44       112        60
OIR    2025250     91400   21.6300 -109.5000       6.2        44       112        60
OIR    2025250     91400   21.6300 -109.5100       6.2        44       112        60
OIR    2025250     91400   21.6300 -109.5200       6.1        44       114        60
OIR    2025250     91400   21.6300 -109.5300       6.0        44       116        60
OIR    2025250     91400   21.6300 -109.5400       5.9        44       116        60
OIR    2025250     91400   21.6300 -109.5500       5.8        44       115        60
OIR    2025250     91400   21.6300 -109.5600       5.5        44       114        60
OIR    2025250     91400   21.6300 -109.5700       5.2        44       114        60
OIR    2025250     91400   21.6300 -109.5800       4.7        45       113        60
OIR    2025250     91400   21.6300 -109.5900       4.1        47       112        60
OIR    2025250     91400   21.6300 -115.1200      18.3       147       138        60
OIR    2025250     91400   21.6300 -115.1300      18.5       148       135        60
OIR    2025250     91400   21.6200 -108.6100       7.6        42       104        60
OIR    2025250     91400   21.6200 -108.6200       7.6        42       104        60
OIR    2025250     91400   21.6200 -108.6300       7.6        42       105        60
OIR    2025250     91400   21.6200 -108.6400       7.6        42       107        60
OIR    2025250     91400   21.6200 -108.6500       7.6        42       104        60
OIR    2025250     91400   21.6200 -108.6600       7.6        42       104        60
OIR    2025250     91400   21.6200 -108.6700       7.6        42       103        60
OIR    2025250     91400   21.6200 -108.6800       7.6        42       103        60
OIR    2025250     91400   21.6200 -108.6900       7.6        42       103        60
OIR    2025250     91400   21.6200 -108.7000       7.6        42       103        60
OIR    2025250     91400   21.6200 -108.7100       7.6        42       104        60
OIR    2025250     91400   21.6200 -108.7200       7.6        42       104        60
OIR    2025250     91400   21.6200 -108.7300       7.6        42       104        60
OIR    2025250     91400   21.6200 -108.7400       7.6        42       104        60
OIR    2025250     91400   21.6200 -108.7500       7.6        42       103        60
OIR    2025250     91400   21.6200 -108.7600       7.6        43       103        60
OIR    2025250     91400   21.6200 -108.7700       7.6        43       103        60
OIR    2025250     91400   21.6200 -108.7800       7.6        43       103        60
OIR    2025250     91400   21.6200 -108.7900       7.7        43       103        60
OIR    2025250     91400   21.6200 -108.8000       7.7        43       104        60
OIR    2025250     91400   21.6200 -108.8100       7.7        43       104        60
OIR    2025250     91400   21.6200 -108.8200       7.7        43       104        60
OIR    2025250     91400   21.6200 -108.8300       7.7        43       104        60
OIR    2025250     91400   21.6200 -108.8400       7.7        43       104        60
OIR    2025250     91400   21.6200 -108.8500       7.7        43       104        60
OIR    2025250     91400   21.6200 -108.8600       7.7        43       104        60
OIR    2025250     91400   21.6200 -108.8700       7.7        43       104        60
OIR    2025250     91400   21.6200 -108.8800       7.7        43       104        60
OIR    2025250     91400   21.6200 -108.8900       7.7        43       105        60
OIR    2025250     91400   21.6200 -108.9000       7.7        43       105        60
OIR    2025250     91400   21.6200 -108.9100       7.7        43       105        60
OIR    2025250     91400   21.6200 -108.9200       7.7        43       105        60
OIR    2025250     91400   21.6200 -108.9300       7.7        43       105        60
OIR    2025250     91400   21.6200 -108.9400       7.7        43       105        60
OIR    2025250     91400   21.6200 -108.9500       7.7        43       105        60
OIR    2025250     91400   21.6200 -108.9600       7.7        43       107        60
OIR    2025250     91400   21.6200 -108.9700       7.7        43       107        60
OIR    2025250     91400   21.6200 -108.9800       7.6        43       107        60
OIR    2025250     91400   21.6200 -108.9900       7.6        43       107        60
OIR    2025250     91400   21.6200 -109.0000       7.6        43       107        60
OIR    2025250     91400   21.6200 -109.0100       7.6        43       107        60
OIR    2025250     91400   21.6200 -109.0200       7.6        43       108        60
OIR    2025250     91400   21.6200 -109.0300       7.6        43       109        60
OIR    2025250     91400   21.6200 -109.0400       7.6        42       111        60
OIR    2025250     91400   21.6200 -109.0500       7.6        42       112        60
OIR    2025250     91400   21.6200 -109.0600       7.6        42       113        60
OIR    2025250     91400   21.6200 -109.0700       7.6        42       114        60
OIR    2025250     91400   21.6200 -109.0800       7.6        42       113        60
OIR    2025250     91400   21.6200 -109.0900       7.6        42       113        60
OIR    2025250     91400   21.6200 -109.1000       7.6        42       114        60
OIR    2025250     91400   21.6200 -109.1100       7.6        42       116        60
OIR    2025250     91400   21.6200 -109.1200       7.6        42       117        60
OIR    2025250     91400   21.6200 -109.1300       7.6        42       115        60
OIR    2025250     91400   21.6200 -109.1400       7.6        42       113        60
OIR    2025250     91400   21.6200 -109.1500       7.6        42       112        60
OIR    2025250     91400   21.6200 -109.1600       7.6        42       111        60
OIR    2025250     91400   21.6200 -109.1700       7.6        42       111        60
OIR    2025250     91400   21.6200 -109.1800       7.6        42       111        60
OIR    2025250     91400   21.6200 -109.1900       7.5        42       111        60
OIR    2025250     91400   21.6200 -109.2000       7.5        42       111        60
OIR    2025250     91400   21.6200 -109.2100       7.5        42       112        60
OIR    2025250     91400   21.6200 -109.2200       7.5        43       113        60
OIR    2025250     91400   21.6200 -109.2300       7.5        43       113        60
OIR    2025250     91400   21.6200 -109.2400       7.5        43       113        60
OIR    2025250     91400   21.6200 -109.2500       7.4        43       114        60
OIR    2025250     91400   21.6200 -109.2600       7.4        43       115        60
OIR    2025250     91400   21.6200 -109.2700       7.4        43       116        60
OIR    2025250     91400   21.6200 -109.2800       7.3        43       117        60
OIR    2025250     91400   21.6200 -109.2900       7.3        43       119        60
OIR    2025250     91400   21.6200 -109.3000       7.3        43       119        60
OIR    2025250     91400   21.6200 -109.3100       7.2        43       116        60
OIR    2025250     91400   21.6200 -109.3200       7.2        43       116        60
OIR    2025250     91400   21.6200 -109.3300       7.2        43       116        60
OIR    2025250     91400   21.6200 -109.3400       7.2        43       116        60
OIR    2025250     91400   21.6200 -109.3500       7.1        43       115        60
OIR    2025250     91400   21.6200 -109.3600       7.0        43       114        60
OIR    2025250     91400   21.6200 -109.3700       6.9        44       113        60
OIR    2025250     91400   21.6200 -109.3800       6.8        44       113        60
OIR    2025250     91400   21.6200 -109.3900       6.7        45       114        60
OIR    2025250     91400   21.6200 -109.4000       6.6        45       113        60
OIR    2025250     91400   21.6200 -109.4100       6.6        45       113        60
OIR    2025250     91400   21.6200 -109.4200       6.5        45       112        60
OIR    2025250     91400   21.6200 -109.4300       6.5        45       112        60
OIR    2025250     91400   21.6200 -109.4400       6.5        45       112        60
OIR    2025250     91400   21.6200 -109.4500       6.4        44       112        60
OIR    2025250     91400   21.6200 -109.4600       6.4        44       111        60
OIR    2025250     91400   21.6200 -109.4700       6.4        44       111        60
OIR    2025250     91400   21.6200 -109.4800       6.3        44       112        60
OIR    2025250     91400   21.6200 -109.4900       6.3        44       113        60
OIR    2025250     91400   21.6200 -109.5000       6.2        44       113        60
OIR    2025250     91400   21.6200 -109.5100       6.1        44       113        60
OIR    2025250     91400   21.6200 -109.5200       6.0        44       113        60
OIR    2025250     91400   21.6200 -109.5300       5.9        44       115        60
OIR    2025250     91400   21.6200 -109.5400       5.8        44       116        60
OIR    2025250     91400   21.6200 -109.5500       5.7        44       116        60
OIR    2025250     91400   21.6200 -109.5600       5.4        44       116        60
OIR    2025250     91400   21.6200 -109.5700       5.1        44       116        60
OIR    2025250     91400   21.6200 -109.5800       4.6        45       115        60
OIR    2025250     91400   21.6200 -109.5900       4.0        47       115        60
OIR    2025250     91400   21.6200 -115.0800      16.7       148       145        60
OIR    2025250     91400   21.6200 -115.0900      17.2       147       153        60
OIR    2025250     91400   21.6100 -108.6100       7.6        43       104        60
OIR    2025250     91400   21.6100 -108.6200       7.6        43       104        60
OIR    2025250     91400   21.6100 -108.6300       7.6        43       105        60
OIR    2025250     91400   21.6100 -108.6400       7.6        43       107        60
OIR    2025250     91400   21.6100 -108.6500       7.6        43       105        60
OIR    2025250     91400   21.6100 -108.6600       7.6        43       104        60
OIR    2025250     91400   21.6100 -108.6700       7.6        43       104        60
OIR    2025250     91400   21.6100 -108.6800       7.6        43       104        60
OIR    2025250     91400   21.6100 -108.6900       7.6        43       104        60
OIR    2025250     91400   21.6100 -108.7000       7.6        43       104        60
OIR    2025250     91400   21.6100 -108.7100       7.6        43       104        60
OIR    2025250     91400   21.6100 -108.7200       7.6        43       104        60
OIR    2025250     91400   21.6100 -108.7300       7.6        43       103        60
OIR    2025250     91400   21.6100 -108.7400       7.6        43       103        60
OIR    2025250     91400   21.6100 -108.7500       7.6        43       103        60
OIR    2025250     91400   21.6100 -108.7600       7.6        43       103        60
OIR    2025250     91400   21.6100 -108.7700       7.6        43       103        60
OIR    2025250     91400   21.6100 -108.7800       7.6        43       103        60
OIR    2025250     91400   21.6100 -108.7900       7.6        43       103        60
OIR    2025250     91400   21.6100 -108.8000       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.8100       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.8200       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.8300       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.8400       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.8500       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.8600       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.8700       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.8800       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.8900       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.9000       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.9100       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.9200       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.9300       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.9400       7.7        43       104        60
OIR    2025250     91400   21.6100 -108.9500       7.7        43       105        60
OIR    2025250     91400   21.6100 -108.9600       7.7        43       107        60
OIR    2025250     91400   21.6100 -108.9700       7.7        43       109        60
OIR    2025250     91400   21.6100 -108.9800       7.6        43       109        60
OIR    2025250     91400   21.6100 -108.9900       7.6        43       109        60
OIR    2025250     91400   21.6100 -109.0000       7.6        43       109        60
OIR    2025250     91400   21.6100 -109.0100       7.6        43       108        60
OIR    2025250     91400   21.6100 -109.0200       7.6        43       108        60
OIR    2025250     91400   21.6100 -109.0300       7.6        43       109        60
OIR    2025250     91400   21.6100 -109.0400       7.6        43       110        60
OIR    2025250     91400   21.6100 -109.0500       7.6        43       111        60
OIR    2025250     91400   21.6100 -109.0600       7.6        43       111        60
OIR    2025250     91400   21.6100 -109.0700       7.6        42       112        60
OIR    2025250     91400   21.6100 -109.0800       7.6        42       112        60
OIR    2025250     91400   21.6100 -109.0900       7.6        42       112        60
OIR    2025250     91400   21.6100 -109.1000       7.6        42       113        60
OIR    2025250     91400   21.6100 -109.1100       7.6        42       114        60
OIR    2025250     91400   21.6100 -109.1200       7.6        42       115        60
OIR    2025250     91400   21.6100 -109.1300       7.6        42       114        60
OIR    2025250     91400   21.6100 -109.1400       7.6        42       112        60
OIR    2025250     91400   21.6100 -109.1500       7.6        42       111        60
OIR    2025250     91400   21.6100 -109.1600       7.6        42       110        60
OIR    2025250     91400   21.6100 -109.1700       7.6        42       110        60
OIR    2025250     91400   21.6100 -109.1800       7.6        42       109        60
OIR    2025250     91400   21.6100 -109.1900       7.6        42       109        60
OIR    2025250     91400   21.6100 -109.2000       7.5        43       109        60
OIR    2025250     91400   21.6100 -109.2100       7.5        43       110        60
OIR    2025250     91400   21.6100 -109.2200       7.5        43       110        60
OIR    2025250     91400   21.6100 -109.2300       7.5        43       110        60
OIR    2025250     91400   21.6100 -109.2400       7.5        43       110        60
OIR    2025250     91400   21.6100 -109.2500       7.4        43       111        60
OIR    2025250     91400   21.6100 -109.2600       7.4        43       114        60
OIR    2025250     91400   21.6100 -109.2700       7.4        43       116        60
OIR    2025250     91400   21.6100 -109.2800       7.3        43       116        60
OIR    2025250     91400   21.6100 -109.2900       7.3        43       116        60
OIR    2025250     91400   21.6100 -109.3000       7.3        43       116        60
OIR    2025250     91400   21.6100 -109.3100       7.2        43       116        60
OIR    2025250     91400   21.6100 -109.3200       7.2        43       115        60
OIR    2025250     91400   21.6100 -109.3300       7.2        43       114        60
OIR    2025250     91400   21.6100 -109.3400       7.1        43       114        60
OIR    2025250     91400   21.6100 -109.3500       7.1        43       113        60
OIR    2025250     91400   21.6100 -109.3600       6.9        44       111        60
OIR    2025250     91400   21.6100 -109.3700       6.8        44       110        60
OIR    2025250     91400   21.6100 -109.3800       6.7        45       111        60
OIR    2025250     91400   21.6100 -109.3900       6.7        45       111        60
OIR    2025250     91400   21.6100 -109.4000       6.6        45       111        60
OIR    2025250     91400   21.6100 -109.4100       6.6        45       111        60
OIR    2025250     91400   21.6100 -109.4200       6.5        45       110        60
OIR    2025250     91400   21.6100 -109.4300       6.5        45       110        60
OIR    2025250     91400   21.6100 -109.4400       6.5        45       110        60
OIR    2025250     91400   21.6100 -109.4500       6.4        45       110        60
OIR    2025250     91400   21.6100 -109.4600       6.4        45       109        60
OIR    2025250     91400   21.6100 -109.4700       6.4        45       109        60
OIR    2025250     91400   21.6100 -109.4800       6.3        44       110        60
OIR    2025250     91400   21.6100 -109.4900       6.3        44       112        60
OIR    2025250     91400   21.6100 -109.5000       6.2        44       112        60
OIR    2025250     91400   21.6100 -109.5100       6.1        44       113        60
OIR    2025250     91400   21.6100 -109.5200       6.0        44       113        60
OIR    2025250     91400   21.6100 -109.5300       5.9        44       113        60
OIR    2025250     91400   21.6100 -109.5400       5.8        44       114        60
OIR    2025250     91400   21.6100 -109.5500       5.5        44       115        60
OIR    2025250     91400   21.6100 -109.5600       5.2        44       115        60
OIR    2025250     91400   21.6100 -109.5700       4.8        45       116        60
OIR    2025250     91400   21.6100 -109.5800       4.4        46       115        60
OIR    2025250     91400   21.6100 -109.5900       4.0        47       114        60
OIR    2025250     91400   21.6100 -115.0800      16.2       150       150        60
OIR    2025250     91400   21.6100 -115.0900      16.8       150       135        60
OIR    2025250     91400   21.6000 -108.6100       7.6        43       107        60
OIR    2025250     91400   21.6000 -108.6200       7.6        43       107        60
OIR    2025250     91400   21.6000 -108.6300       7.6        43       107        60
OIR    2025250     91400   21.6000 -108.6400       7.6        43       107        60
OIR    2025250     91400   21.6000 -108.6500       7.6        43       107        60
OIR    2025250     91400   21.6000 -108.6600       7.6        43       105        60
OIR    2025250     91400   21.6000 -108.6700       7.6        43       105        60
OIR    2025250     91400   21.6000 -108.6800       7.6        43       105        60
OIR    2025250     91400   21.6000 -108.6900       7.6        43       105        60
OIR    2025250     91400   21.6000 -108.7000       7.6        43       104        60
OIR    2025250     91400   21.6000 -108.7100       7.6        43       104        60
OIR    2025250     91400   21.6000 -108.7200       7.6        43       104        60
OIR    2025250     91400   21.6000 -108.7300       7.6        43       104        60
OIR    2025250     91400   21.6000 -108.7400       7.6        43       104        60
OIR    2025250     91400   21.6000 -108.7500       7.6        43       104        60
OIR    2025250     91400   21.6000 -108.7600       7.6        43       104        60
OIR    2025250     91400   21.6000 -108.7700       7.6        43       104        60
OIR    2025250     91400   21.6000 -108.7800       7.6        43       104        60
OIR    2025250     91400   21.6000 -108.7900       7.6        43       104        60
OIR    2025250     91400   21.6000 -108.8000       7.7        43       104        60
OIR    2025250     91400   21.6000 -108.8100       7.7        43       104        60
OIR    2025250     91400   21.6000 -108.8200       7.7        43       104        60
OIR    2025250     91400   21.6000 -108.8300       7.7        43       104        60
OIR    2025250     91400   21.6000 -108.8400       7.7        43       104        60
OIR    2025250     91400   21.6000 -108.8500       7.7        43       104        60
OIR    2025250     91400   21.6000 -108.8600       7.7        43       104        60
OIR    2025250     91400   21.6000 -108.8700       7.7        43       104        60
OIR    2025250     91400   21.6000 -108.8800       7.7        43       104        60
OIR    2025250     91400   21.6000 -108.8900       7.7        43       105        60
OIR    2025250     91400   21.6000 -108.9000       7.7        43       105        60
OIR    2025250     91400   21.6000 -108.9100       7.7        43       105        60
OIR    2025250     91400   21.6000 -108.9200       7.7        43       105        60
OIR    2025250     91400   21.6000 -108.9300       7.7        43       104        60
OIR    2025250     91400   21.6000 -108.9400       7.7        43       104        60
OIR    2025250     91400   21.6000 -108.9500       7.7        43       105        60
OIR    2025250     91400   21.6000 -108.9600       7.7        43       108        60
OIR    2025250     91400   21.6000 -108.9700       7.7        43       110        60
OIR    2025250     91400   21.6000 -108.9800       7.6        43       110        60
OIR    2025250     91400   21.6000 -108.9900       7.6        43       110        60
OIR    2025250     91400   21.6000 -109.0000       7.6        43       110        60
OIR    2025250     91400   21.6000 -109.0100       7.6        43       110        60
OIR    2025250     91400   21.6000 -109.0200       7.6        43       109        60
OIR    2025250     91400   21.6000 -109.0300       7.6        43       109        60
OIR    2025250     91400   21.6000 -109.0400       7.6        43       109        60
OIR    2025250     91400   21.6000 -109.0500       7.6        43       109        60
OIR    2025250     91400   21.6000 -109.0600       7.6        43       110        60
OIR    2025250     91400   21.6000 -109.0700       7.6        43       110        60
OIR    2025250     91400   21.6000 -109.0800       7.6        42       111        60
OIR    2025250     91400   21.6000 -109.0900       7.6        42       112        60
OIR    2025250     91400   21.6000 -109.1000       7.6        42       112        60
OIR    2025250     91400   21.6000 -109.1100       7.6        42       113        60
OIR    2025250     91400   21.6000 -109.1200       7.6        42       113        60
OIR    2025250     91400   21.6000 -109.1300       7.6        42       113        60
OIR    2025250     91400   21.6000 -109.1400       7.6        42       112        60
OIR    2025250     91400   21.6000 -109.1500       7.6        42       111        60
OIR    2025250     91400   21.6000 -109.1600       7.6        42       110        60
OIR    2025250     91400   21.6000 -109.1700       7.6        42       110        60
OIR    2025250     91400   21.6000 -109.1800       7.6        43       109        60
OIR    2025250     91400   21.6000 -109.1900       7.6        43       108        60
OIR    2025250     91400   21.6000 -109.2000       7.5        43       107        60
OIR    2025250     91400   21.6000 -109.2100       7.5        43       108        60
OIR    2025250     91400   21.6000 -109.2200       7.5        43       109        60
OIR    2025250     91400   21.6000 -109.2300       7.5        43       109        60
OIR    2025250     91400   21.6000 -109.2400       7.5        43       109        60
OIR    2025250     91400   21.6000 -109.2500       7.4        43       109        60
OIR    2025250     91400   21.6000 -109.2600       7.4        43       112        60
OIR    2025250     91400   21.6000 -109.2700       7.4        43       115        60
OIR    2025250     91400   21.6000 -109.2800       7.3        43       116        60
OIR    2025250     91400   21.6000 -109.2900       7.3        43       116        60
OIR    2025250     91400   21.6000 -109.3000       7.2        43       116        60
OIR    2025250     91400   21.6000 -109.3100       7.2        43       115        60
OIR    2025250     91400   21.6000 -109.3200       7.2        43       113        60
OIR    2025250     91400   21.6000 -109.3300       7.1        43       113        60
OIR    2025250     91400   21.6000 -109.3400       7.1        43       112        60
OIR    2025250     91400   21.6000 -109.3500       7.0        43       112        60
OIR    2025250     91400   21.6000 -109.3600       6.9        44       112        60
OIR    2025250     91400   21.6000 -109.3700       6.7        45       111        60
OIR    2025250     91400   21.6000 -109.3800       6.7        45       111        60
OIR    2025250     91400   21.6000 -109.3900       6.6        45       110        60
OIR    2025250     91400   21.6000 -109.4000       6.6        45       110        60
OIR    2025250     91400   21.6000 -109.4100       6.5        45       110        60
OIR    2025250     91400   21.6000 -109.4200       6.5        45       109        60
OIR    2025250     91400   21.6000 -109.4300       6.5        45       109        60
OIR    2025250     91400   21.6000 -109.4400       6.4        45       109        60
OIR    2025250     91400   21.6000 -109.4500       6.4        45       109        60
OIR    2025250     91400   21.6000 -109.4600       6.4        45       109        60
OIR    2025250     91400   21.6000 -109.4700       6.3        45       109        60
OIR    2025250     91400   21.6000 -109.4800       6.3        45       110        60
OIR    2025250     91400   21.6000 -109.4900       6.2        45       112        60
OIR    2025250     91400   21.6000 -109.5000       6.2        45       112        60
OIR    2025250     91400   21.6000 -109.5100       6.1        45       113        60
OIR    2025250     91400   21.6000 -109.5200       5.9        45       113        60
OIR    2025250     91400   21.6000 -109.5300       5.8        45       113        60
OIR    2025250     91400   21.6000 -109.5400       5.6        45       112        60
OIR    2025250     91400   21.6000 -109.5500       5.4        45       113        60
OIR    2025250     91400   21.6000 -109.5600       5.0        45       114        60
OIR    2025250     91400   21.6000 -109.5700       4.6        46       115        60
OIR    2025250     91400   21.6000 -109.5800       4.2        47       114        60
OIR    2025250     91400   21.5900 -108.6100       7.6        43       109        60
OIR    2025250     91400   21.5900 -108.6200       7.6        43       108        60
OIR    2025250     91400   21.5900 -108.6300       7.6        43       108        60
OIR    2025250     91400   21.5900 -108.6400       7.6        43       107        60
OIR    2025250     91400   21.5900 -108.6500       7.6        43       107        60
OIR    2025250     91400   21.5900 -108.6600       7.6        43       107        60
OIR    2025250     91400   21.5900 -108.6700       7.6        43       108        60
OIR    2025250     91400   21.5900 -108.6800       7.5        43       108        60
OIR    2025250     91400   21.5900 -108.6900       7.5        43       108        60
OIR    2025250     91400   21.5900 -108.7000       7.5        43       107        60
OIR    2025250     91400   21.5900 -108.7100       7.6        43       105        60
OIR    2025250     91400   21.5900 -108.7200       7.6        43       104        60
OIR    2025250     91400   21.5900 -108.7300       7.6        43       104        60
OIR    2025250     91400   21.5900 -108.7400       7.6        43       104        60
OIR    2025250     91400   21.5900 -108.7500       7.6        43       104        60
OIR    2025250     91400   21.5900 -108.7600       7.6        43       104        60
OIR    2025250     91400   21.5900 -108.7700       7.6        43       105        60
OIR    2025250     91400   21.5900 -108.7800       7.6        43       107        60
OIR    2025250     91400   21.5900 -108.7900       7.6        43       107        60
OIR    2025250     91400   21.5900 -108.8000       7.7        43       107        60
OIR    2025250     91400   21.5900 -108.8100       7.7        43       105        60
OIR    2025250     91400   21.5900 -108.8200       7.7        43       105        60
OIR    2025250     91400   21.5900 -108.8300       7.7        43       104        60
OIR    2025250     91400   21.5900 -108.8400       7.7        43       104        60
OIR    2025250     91400   21.5900 -108.8500       7.7        43       104        60
OIR    2025250     91400   21.5900 -108.8600       7.7        43       104        60
OIR    2025250     91400   21.5900 -108.8700       7.7        43       104        60
OIR    2025250     91400   21.5900 -108.8800       7.7        43       104        60
OIR    2025250     91400   21.5900 -108.8900       7.7        43       105        60
OIR    2025250     91400   21.5900 -108.9000       7.7        43       107        60
OIR    2025250     91400   21.5900 -108.9100       7.7        43       108        60
OIR    2025250     91400   21.5900 -108.9200       7.7        43       109        60
OIR    2025250     91400   21.5900 -108.9300       7.7        43       109        60
OIR    2025250     91400   21.5900 -108.9400       7.7        43       109        60
OIR    2025250     91400   21.5900 -108.9500       7.7        43       108        60
OIR    2025250     91400   21.5900 -108.9600       7.7        43       109        60
OIR    2025250     91400   21.5900 -108.9700       7.7        43       110        60
OIR    2025250     91400   21.5900 -108.9800       7.6        43       111        60
OIR    2025250     91400   21.5900 -108.9900       7.6        43       111        60
OIR    2025250     91400   21.5900 -109.0000       7.6        43       111        60
OIR    2025250     91400   21.5900 -109.0100       7.6        43       111        60
OIR    2025250     91400   21.5900 -109.0200       7.6        43       111        60
OIR    2025250     91400   21.5900 -109.0300       7.6        43       111        60
OIR    2025250     91400   21.5900 -109.0400       7.6        43       111        60
OIR    2025250     91400   21.5900 -109.0500       7.6        43       112        60
OIR    2025250     91400   21.5900 -109.0600       7.6        43       112        60
OIR    2025250     91400   21.5900 -109.0700       7.6        43       112        60
OIR    2025250     91400   21.5900 -109.0800       7.6        43       112        60
OIR    2025250     91400   21.5900 -109.0900       7.6        42       113        60
OIR    2025250     91400   21.5900 -109.1000       7.6        42       114        60
OIR    2025250     91400   21.5900 -109.1100       7.6        42       114        60
OIR    2025250     91400   21.5900 -109.1200       7.6        42       113        60
OIR    2025250     91400   21.5900 -109.1300       7.6        42       113        60
OIR    2025250     91400   21.5900 -109.1400       7.6        43       112        60
OIR    2025250     91400   21.5900 -109.1500       7.6        43       111        60
OIR    2025250     91400   21.5900 -109.1600       7.6        43       111        60
OIR    2025250     91400   21.5900 -109.1700       7.6        43       110        60
OIR    2025250     91400   21.5900 -109.1800       7.6        43       109        60
OIR    2025250     91400   21.5900 -109.1900       7.6        43       108        60
OIR    2025250     91400   21.5900 -109.2000       7.6        43       107        60
OIR    2025250     91400   21.5900 -109.2100       7.5        43       107        60
OIR    2025250     91400   21.5900 -109.2200       7.5        43       108        60
OIR    2025250     91400   21.5900 -109.2300       7.5        43       108        60
OIR    2025250     91400   21.5900 -109.2400       7.5        43       108        60
OIR    2025250     91400   21.5900 -109.2500       7.4        43       108        60
OIR    2025250     91400   21.5900 -109.2600       7.4        43       110        60
OIR    2025250     91400   21.5900 -109.2700       7.4        43       113        60
OIR    2025250     91400   21.5900 -109.2800       7.3        43       114        60
OIR    2025250     91400   21.5900 -109.2900       7.3        43       116        60
OIR    2025250     91400   21.5900 -109.3000       7.2        43       116        60
OIR    2025250     91400   21.5900 -109.3100       7.2        43       115        60
OIR    2025250     91400   21.5900 -109.3200       7.2        43       112        60
OIR    2025250     91400   21.5900 -109.3300       7.1        43       111        60
OIR    2025250     91400   21.5900 -109.3400       7.0        43       111        60
OIR    2025250     91400   21.5900 -109.3500       6.9        44       110        60
OIR    2025250     91400   21.5900 -109.3600       6.8        44       112        60
OIR    2025250     91400   21.5900 -109.3700       6.7        45       113        60
OIR    2025250     91400   21.5900 -109.3800       6.7        45       113        60
OIR    2025250     91400   21.5900 -109.3900       6.6        45       111        60
OIR    2025250     91400   21.5900 -109.4000       6.6        45       110        60
OIR    2025250     91400   21.5900 -109.4100       6.5        45       110        60
OIR    2025250     91400   21.5900 -109.4200       6.5        45       109        60
OIR    2025250     91400   21.5900 -109.4300       6.5        45       109        60
OIR    2025250     91400   21.5900 -109.4400       6.4        45       110        60
OIR    2025250     91400   21.5900 -109.4500       6.4        45       110        60
OIR    2025250     91400   21.5900 -109.4600       6.4        45       111        60
OIR    2025250     91400   21.5900 -109.4700       6.3        45       112        60
OIR    2025250     91400   21.5900 -109.4800       6.3        45       113        60
OIR    2025250     91400   21.5900 -109.4900       6.2        45       115        60
OIR    2025250     91400   21.5900 -109.5000       6.1        45       115        60
OIR    2025250     91400   21.5900 -109.5100       6.0        45       114        60
OIR    2025250     91400   21.5900 -109.5200       5.9        45       113        60
OIR    2025250     91400   21.5900 -109.5300       5.7        45       113        60
OIR    2025250     91400   21.5900 -109.5400       5.4        45       114        60
OIR    2025250     91400   21.5900 -109.5500       5.1        46       114        60
OIR    2025250     91400   21.5900 -109.5600       4.7        46       114        60
OIR    2025250     91400   21.5900 -109.5700       4.3        47       114        60
OIR    2025250     91400   21.5900 -109.5800       4.0        48       114        60
OIR    2025250     91400   21.5800 -108.6100       7.5        44       110        60
OIR    2025250     91400   21.5800 -108.6200       7.5        44       109        60
OIR    2025250     91400   21.5800 -108.6300       7.5        44       108        60
OIR    2025250     91400   21.5800 -108.6400       7.6        43       108        60
OIR    2025250     91400   21.5800 -108.6500       7.5        43       107        60
OIR    2025250     91400   21.5800 -108.6600       7.5        43       107        60
OIR    2025250     91400   21.5800 -108.6700       7.5        44       108        60
OIR    2025250     91400   21.5800 -108.6800       7.5        44       108        60
OIR    2025250     91400   21.5800 -108.6900       7.5        44       108        60
OIR    2025250     91400   21.5800 -108.7000       7.5        44       108        60
OIR    2025250     91400   21.5800 -108.7100       7.5        44       107        60
OIR    2025250     91400   21.5800 -108.7200       7.6        44       105        60
OIR    2025250     91400   21.5800 -108.7300       7.6        43       104        60
OIR    2025250     91400   21.5800 -108.7400       7.6        43       104        60
OIR    2025250     91400   21.5800 -108.7500       7.6        43       104        60
OIR    2025250     91400   21.5800 -108.7600       7.6        43       104        60
OIR    2025250     91400   21.5800 -108.7700       7.6        43       105        60
OIR    2025250     91400   21.5800 -108.7800       7.6        43       107        60
OIR    2025250     91400   21.5800 -108.7900       7.6        43       107        60
OIR    2025250     91400   21.5800 -108.8000       7.7        43       107        60
OIR    2025250     91400   21.5800 -108.8100       7.7        43       107        60
OIR    2025250     91400   21.5800 -108.8200       7.7        43       105        60
OIR    2025250     91400   21.5800 -108.8300       7.7        43       105        60
OIR    2025250     91400   21.5800 -108.8400       7.7        43       105        60
OIR    2025250     91400   21.5800 -108.8500       7.7        43       105        60
OIR    2025250     91400   21.5800 -108.8600       7.7        43       105        60
OIR    2025250     91400   21.5800 -108.8700       7.7        43       104        60
OIR    2025250     91400   21.5800 -108.8800       7.7        43       104        60
OIR    2025250     91400   21.5800 -108.8900       7.7        43       105        60
OIR    2025250     91400   21.5800 -108.9000       7.7        43       108        60
OIR    2025250     91400   21.5800 -108.9100       7.7        43       109        60
OIR    2025250     91400   21.5800 -108.9200       7.7        43       110        60
OIR    2025250     91400   21.5800 -108.9300       7.7        43       111        60
OIR    2025250     91400   21.5800 -108.9400       7.7        43       111        60
OIR    2025250     91400   21.5800 -108.9500       7.7        43       111        60
OIR    2025250     91400   21.5800 -108.9600       7.7        43       111        60
OIR    2025250     91400   21.5800 -108.9700       7.7        43       111        60
OIR    2025250     91400   21.5800 -108.9800       7.7        43       112        60
OIR    2025250     91400   21.5800 -108.9900       7.6        43       112        60
OIR    2025250     91400   21.5800 -109.0000       7.6        43       112        60
OIR    2025250     91400   21.5800 -109.0100       7.6        43       112        60
OIR    2025250     91400   21.5800 -109.0200       7.6        43       113        60
OIR    2025250     91400   21.5800 -109.0300       7.6        43       113        60
OIR    2025250     91400   21.5800 -109.0400       7.6        43       114        60
OIR    2025250     91400   21.5800 -109.0500       7.6        43       114        60
OIR    2025250     91400   21.5800 -109.0600       7.6        43       114        60
OIR    2025250     91400   21.5800 -109.0700       7.6        43       114        60
OIR    2025250     91400   21.5800 -109.0800       7.6        43       114        60
OIR    2025250     91400   21.5800 -109.0900       7.6        43       115        60
OIR    2025250     91400   21.5800 -109.1000       7.6        43       116        60
OIR    2025250     91400   21.5800 -109.1100       7.6        43       116        60
OIR    2025250     91400   21.5800 -109.1200       7.6        43       115        60
OIR    2025250     91400   21.5800 -109.1300       7.6        43       114        60
OIR    2025250     91400   21.5800 -109.1400       7.6        43       113        60
OIR    2025250     91400   21.5800 -109.1500       7.6        43       112        60
OIR    2025250     91400   21.5800 -109.1600       7.6        43       111        60
OIR    2025250     91400   21.5800 -109.1700       7.6        43       110        60
OIR    2025250     91400   21.5800 -109.1800       7.6        43       109        60
OIR    2025250     91400   21.5800 -109.1900       7.6        43       109        60
OIR    2025250     91400   21.5800 -109.2000       7.6        43       108        60
OIR    2025250     91400   21.5800 -109.2100       7.5        43       107        60
OIR    2025250     91400   21.5800 -109.2200       7.5        43       108        60
OIR    2025250     91400   21.5800 -109.2300       7.5        43       108        60
OIR    2025250     91400   21.5800 -109.2400       7.5        43       108        60
OIR    2025250     91400   21.5800 -109.2500       7.4        43       108        60
OIR    2025250     91400   21.5800 -109.2600       7.4        43       109        60
OIR    2025250     91400   21.5800 -109.2700       7.4        43       110        60
OIR    2025250     91400   21.5800 -109.2800       7.3        43       112        60
OIR    2025250     91400   21.5800 -109.2900       7.3        43       113        60
OIR    2025250     91400   21.5800 -109.3000       7.2        43       114        60
OIR    2025250     91400   21.5800 -109.3100       7.2        43       115        60
OIR    2025250     91400   21.5800 -109.3200       7.1        43       114        60
OIR    2025250     91400   21.5800 -109.3300       7.0        44       113        60
OIR    2025250     91400   21.5800 -109.3400       7.0        44       112        60
OIR    2025250     91400   21.5800 -109.3500       6.9        44       110        60
OIR    2025250     91400   21.5800 -109.3600       6.8        45       111        60
OIR    2025250     91400   21.5800 -109.3700       6.7        45       112        60
OIR    2025250     91400   21.5800 -109.3800       6.6        45       113        60
OIR    2025250     91400   21.5800 -109.3900       6.6        45       112        60
OIR    2025250     91400   21.5800 -109.4000       6.5        45       111        60
OIR    2025250     91400   21.5800 -109.4100       6.5        45       111        60
OIR    2025250     91400   21.5800 -109.4200       6.5        45       110        60
OIR    2025250     91400   21.5800 -109.4300       6.4        45       110        60
OIR    2025250     91400   21.5800 -109.4400       6.4        45       110        60
OIR    2025250     91400   21.5800 -109.4500       6.4        45       111        60
OIR    2025250     91400   21.5800 -109.4600       6.4        45       112        60
OIR    2025250     91400   21.5800 -109.4700       6.3        45       113        60
OIR    2025250     91400   21.5800 -109.4800       6.3        45       115        60
OIR    2025250     91400   21.5800 -109.4900       6.2        45       116        60
OIR    2025250     91400   21.5800 -109.5000       6.1        45       116        60
OIR    2025250     91400   21.5800 -109.5100       6.0        45       115        60
OIR    2025250     91400   21.5800 -109.5200       5.8        45       114        60
OIR    2025250     91400   21.5800 -109.5300       5.6        46       113        60
OIR    2025250     91400   21.5800 -109.5400       5.3        46       115        60
OIR    2025250     91400   21.5800 -109.5500       4.9        47       116        60
OIR    2025250     91400   21.5800 -109.5600       4.4        47       116        60
OIR    2025250     91400   21.5800 -109.5700       4.1        48       114        60
OIR    2025250     91400   21.5700 -108.6100       7.4        46       110        60
OIR    2025250     91400   21.5700 -108.6200       7.4        46       109        60
OIR    2025250     91400   21.5700 -108.6300       7.4        46       109        60
OIR    2025250     91400   21.5700 -108.6400       7.5        45       108        60
OIR    2025250     91400   21.5700 -108.6500       7.5        45       108        60
OIR    2025250     91400   21.5700 -108.6600       7.5        44       108        60
OIR    2025250     91400   21.5700 -108.6700       7.5        44       108        60
OIR    2025250     91400   21.5700 -108.6800       7.5        44       109        60
OIR    2025250     91400   21.5700 -108.6900       7.5        44       108        60
OIR    2025250     91400   21.5700 -108.7000       7.5        44       108        60
OIR    2025250     91400   21.5700 -108.7100       7.5        44       108        60
OIR    2025250     91400   21.5700 -108.7200       7.6        44       107        60
OIR    2025250     91400   21.5700 -108.7300       7.6        44       105        60
OIR    2025250     91400   21.5700 -108.7400       7.6        44       105        60
OIR    2025250     91400   21.5700 -108.7500       7.6        44       104        60
OIR    2025250     91400   21.5700 -108.7600       7.6        44       104        60
OIR    2025250     91400   21.5700 -108.7700       7.6        43       105        60
OIR    2025250     91400   21.5700 -108.7800       7.6        43       107        60
OIR    2025250     91400   21.5700 -108.7900       7.7        43       107        60
OIR    2025250     91400   21.5700 -108.8000       7.7        43       107        60
OIR    2025250     91400   21.5700 -108.8100       7.7        43       105        60
OIR    2025250     91400   21.5700 -108.8200       7.7        43       107        60
OIR    2025250     91400   21.5700 -108.8300       7.7        43       107        60
OIR    2025250     91400   21.5700 -108.8400       7.7        43       107        60
OIR    2025250     91400   21.5700 -108.8500       7.7        43       108        60
OIR    2025250     91400   21.5700 -108.8600       7.7        43       109        60
OIR    2025250     91400   21.5700 -108.8700       7.7        43       108        60
OIR    2025250     91400   21.5700 -108.8800       7.7        43       108        60
OIR    2025250     91400   21.5700 -108.8900       7.7        43       108        60
OIR    2025250     91400   21.5700 -108.9000       7.7        43       109        60
OIR    2025250     91400   21.5700 -108.9100       7.7        43       109        60
OIR    2025250     91400   21.5700 -108.9200       7.7        43       110        60
OIR    2025250     91400   21.5700 -108.9300       7.7        43       110        60
OIR    2025250     91400   21.5700 -108.9400       7.7        43       110        60
OIR    2025250     91400   21.5700 -108.9500       7.7        43       110        60
OIR    2025250     91400   21.5700 -108.9600       7.7        43       110        60
OIR    2025250     91400   21.5700 -108.9700       7.7        43       110        60
OIR    2025250     91400   21.5700 -108.9800       7.7        43       110        60
OIR    2025250     91400   21.5700 -108.9900       7.6        43       111        60
OIR    2025250     91400   21.5700 -109.0000       7.6        43       111        60
OIR    2025250     91400   21.5700 -109.0100       7.6        43       112        60
OIR    2025250     91400   21.5700 -109.0200       7.6        43       113        60
OIR    2025250     91400   21.5700 -109.0300       7.6        43       113        60
OIR    2025250     91400   21.5700 -109.0400       7.6        43       113        60
OIR    2025250     91400   21.5700 -109.0500       7.6        43       114        60
OIR    2025250     91400   21.5700 -109.0600       7.6        43       114        60
OIR    2025250     91400   21.5700 -109.0700       7.6        43       113        60
OIR    2025250     91400   21.5700 -109.0800       7.6        43       113        60
OIR    2025250     91400   21.5700 -109.0900       7.6        43       114        60
OIR    2025250     91400   21.5700 -109.1000       7.6        43       115        60
OIR    2025250     91400   21.5700 -109.1100       7.6        43       116        60
OIR    2025250     91400   21.5700 -109.1200       7.6        43       115        60
OIR    2025250     91400   21.5700 -109.1300       7.6        43       114        60
OIR    2025250     91400   21.5700 -109.1400       7.6        43       113        60
OIR    2025250     91400   21.5700 -109.1500       7.6        43       112        60
OIR    2025250     91400   21.5700 -109.1600       7.6        43       111        60
OIR    2025250     91400   21.5700 -109.1700       7.6        43       111        60
OIR    2025250     91400   21.5700 -109.1800       7.6        43       110        60
OIR    2025250     91400   21.5700 -109.1900       7.6        43       109        60
OIR    2025250     91400   21.5700 -109.2000       7.6        43       108        60
OIR    2025250     91400   21.5700 -109.2100       7.5        43       108        60
OIR    2025250     91400   21.5700 -109.2200       7.5        43       107        60
OIR    2025250     91400   21.5700 -109.2300       7.5        43       107        60
OIR    2025250     91400   21.5700 -109.2400       7.5        43       107        60
OIR    2025250     91400   21.5700 -109.2500       7.4        43       108        60
OIR    2025250     91400   21.5700 -109.2600       7.4        43       109        60
OIR    2025250     91400   21.5700 -109.2700       7.4        43       109        60
OIR    2025250     91400   21.5700 -109.2800       7.3        44       110        60
OIR    2025250     91400   21.5700 -109.2900       7.2        44       111        60
OIR    2025250     91400   21.5700 -109.3000       7.2        44       112        60
OIR    2025250     91400   21.5700 -109.3100       7.1        44       113        60
OIR    2025250     91400   21.5700 -109.3200       7.1        44       115        60
OIR    2025250     91400   21.5700 -109.3300       7.0        44       115        60
OIR    2025250     91400   21.5700 -109.3400       6.9        44       113        60
OIR    2025250     91400   21.5700 -109.3500       6.8        45       111        60
OIR    2025250     91400   21.5700 -109.3600       6.7        45       111        60
OIR    2025250     91400   21.5700 -109.3700       6.7        45       112        60
OIR    2025250     91400   21.5700 -109.3800       6.6        45       112        60
OIR    2025250     91400   21.5700 -109.3900       6.6        45       113        60
OIR    2025250     91400   21.5700 -109.4000       6.5        45       112        60
OIR    2025250     91400   21.5700 -109.4100       6.5        45       112        60
OIR    2025250     91400   21.5700 -109.4200       6.5        45       112        60
OIR    2025250     91400   21.5700 -109.4300       6.4        45       111        60
OIR    2025250     91400   21.5700 -109.4400       6.4        45       111        60
OIR    2025250     91400   21.5700 -109.4500       6.4        45       111        60
OIR    2025250     91400   21.5700 -109.4600       6.3        45       112        60
OIR    2025250     91400   21.5700 -109.4700       6.3        45       113        60
OIR    2025250     91400   21.5700 -109.4800       6.3        45       114        60
OIR    2025250     91400   21.5700 -109.4900       6.2        45       114        60
OIR    2025250     91400   21.5700 -109.5000       6.1        46       115        60
OIR    2025250     91400   21.5700 -109.5100       5.9        46       114        60
OIR    2025250     91400   21.5700 -109.5200       5.6        46       114        60
OIR    2025250     91400   21.5700 -109.5300       5.3        46       114        60
OIR    2025250     91400   21.5700 -109.5400       5.0        46       115        60
OIR    2025250     91400   21.5700 -109.5500       4.6        47       116        60
OIR    2025250     91400   21.5700 -109.5600       4.2        47       116        60
OIR    2025250     91400   21.5600 -108.6100       7.3        48       109        60
OIR    2025250     91400   21.5600 -108.6200       7.3        48       109        60
OIR    2025250     91400   21.5600 -108.6300       7.3        47       109        60
OIR    2025250     91400   21.5600 -108.6400       7.3        47       108        60
OIR    2025250     91400   21.5600 -108.6500       7.4        46       108        60
OIR    2025250     91400   21.5600 -108.6600       7.4        46       108        60
OIR    2025250     91400   21.5600 -108.6700       7.4        46       108        60
OIR    2025250     91400   21.5600 -108.6800       7.4        45       108        60
OIR    2025250     91400   21.5600 -108.6900       7.4        45       108        60
OIR    2025250     91400   21.5600 -108.7000       7.5        45       108        60
OIR    2025250     91400   21.5600 -108.7100       7.5        44       107        60
OIR    2025250     91400   21.5600 -108.7200       7.5        44       107        60
OIR    2025250     91400   21.5600 -108.7300       7.6        44       105        60
OIR    2025250     91400   21.5600 -108.7400       7.6        44       105        60
OIR    2025250     91400   21.5600 -108.7500       7.6        44       104        60
OIR    2025250     91400   21.5600 -108.7600       7.6        44       104        60
OIR    2025250     91400   21.5600 -108.7700       7.6        44       104        60
OIR    2025250     91400   21.5600 -108.7800       7.6        44       104        60
OIR    2025250     91400   21.5600 -108.7900       7.7        44       105        60
OIR    2025250     91400   21.5600 -108.8000       7.7        43       104        60
OIR    2025250     91400   21.5600 -108.8100       7.7        43       104        60
OIR    2025250     91400   21.5600 -108.8200       7.7        43       105        60
OIR    2025250     91400   21.5600 -108.8300       7.7        43       105        60
OIR    2025250     91400   21.5600 -108.8400       7.7        43       107        60
OIR    2025250     91400   21.5600 -108.8500       7.7        43       107        60
OIR    2025250     91400   21.5600 -108.8600       7.7        43       108        60
OIR    2025250     91400   21.5600 -108.8700       7.7        43       108        60
OIR    2025250     91400   21.5600 -108.8800       7.7        43       108        60
OIR    2025250     91400   21.5600 -108.8900       7.7        43       108        60
OIR    2025250     91400   21.5600 -108.9000       7.7        43       109        60
OIR    2025250     91400   21.5600 -108.9100       7.7        43       110        60
OIR    2025250     91400   21.5600 -108.9200       7.7        43       110        60
OIR    2025250     91400   21.5600 -108.9300       7.7        43       110        60
OIR    2025250     91400   21.5600 -108.9400       7.7        43       110        60
OIR    2025250     91400   21.5600 -108.9500       7.7        43       110        60
OIR    2025250     91400   21.5600 -108.9600       7.7        43       110        60
OIR    2025250     91400   21.5600 -108.9700       7.7        43       109        60
OIR    2025250     91400   21.5600 -108.9800       7.7        43       108        60
OIR    2025250     91400   21.5600 -108.9900       7.7        43       109        60
OIR    2025250     91400   21.5600 -109.0000       7.6        43       110        60
OIR    2025250     91400   21.5600 -109.0100       7.6        43       112        60
OIR    2025250     91400   21.5600 -109.0200       7.6        43       112        60
OIR    2025250     91400   21.5600 -109.0300       7.6        43       113        60
OIR    2025250     91400   21.5600 -109.0400       7.6        43       114        60
OIR    2025250     91400   21.5600 -109.0500       7.6        43       113        60
OIR    2025250     91400   21.5600 -109.0600       7.6        43       112        60
OIR    2025250     91400   21.5600 -109.0700       7.6        43       112        60
OIR    2025250     91400   21.5600 -109.0800       7.6        43       112        60
OIR    2025250     91400   21.5600 -109.0900       7.6        43       112        60
OIR    2025250     91400   21.5600 -109.1000       7.6        43       113        60
OIR    2025250     91400   21.5600 -109.1100       7.6        43       114        60
OIR    2025250     91400   21.5600 -109.1200       7.6        43       114        60
OIR    2025250     91400   21.5600 -109.1300       7.6        43       113        60
OIR    2025250     91400   21.5600 -109.1400       7.6        43       113        60
OIR    2025250     91400   21.5600 -109.1500       7.6        43       113        60
OIR    2025250     91400   21.5600 -109.1600       7.6        43       112        60
OIR    2025250     91400   21.5600 -109.1700       7.6        43       111        60
OIR    2025250     91400   21.5600 -109.1800       7.6        43       110        60
OIR    2025250     91400   21.5600 -109.1900       7.6        43       109        60
OIR    2025250     91400   21.5600 -109.2000       7.6        43       108        60
OIR    2025250     91400   21.5600 -109.2100       7.5        43       107        60
OIR    2025250     91400   21.5600 -109.2200       7.5        43       107        60
OIR    2025250     91400   21.5600 -109.2300       7.5        43       107        60
OIR    2025250     91400   21.5600 -109.2400       7.5        43       107        60
OIR    2025250     91400   21.5600 -109.2500       7.4        43       108        60
OIR    2025250     91400   21.5600 -109.2600       7.4        44       109        60
OIR    2025250     91400   21.5600 -109.2700       7.3        44       109        60
OIR    2025250     91400   21.5600 -109.2800       7.3        44       110        60
OIR    2025250     91400   21.5600 -109.2900       7.2        44       111        60
OIR    2025250     91400   21.5600 -109.3000       7.2        44       111        60
OIR    2025250     91400   21.5600 -109.3100       7.1        44       112        60
OIR    2025250     91400   21.5600 -109.3200       7.0        44       113        60
OIR    2025250     91400   21.5600 -109.3300       6.9        45       114        60
OIR    2025250     91400   21.5600 -109.3400       6.8        45       113        60
OIR    2025250     91400   21.5600 -109.3500       6.7        45       112        60
OIR    2025250     91400   21.5600 -109.3600       6.7        45       111        60
OIR    2025250     91400   21.5600 -109.3700       6.6        45       111        60
OIR    2025250     91400   21.5600 -109.3800       6.6        46       112        60
OIR    2025250     91400   21.5600 -109.3900       6.5        46       113        60
OIR    2025250     91400   21.5600 -109.4000       6.5        46       113        60
OIR    2025250     91400   21.5600 -109.4100       6.5        46       113        60
OIR    2025250     91400   21.5600 -109.4200       6.4        45       113        60
OIR    2025250     91400   21.5600 -109.4300       6.4        45       112        60
OIR    2025250     91400   21.5600 -109.4400       6.4        45       112        60
OIR    2025250     91400   21.5600 -109.4500       6.4        45       113        60
OIR    2025250     91400   21.5600 -109.4600       6.3        45       113        60
OIR    2025250     91400   21.5600 -109.4700       6.3        45       113        60
OIR    2025250     91400   21.5600 -109.4800       6.3        45       114        60
OIR    2025250     91400   21.5600 -109.4900       6.2        46       113        60
OIR    2025250     91400   21.5600 -109.5000       6.1        46       113        60
OIR    2025250     91400   21.5600 -109.5100       5.8        46       113        60
OIR    2025250     91400   21.5600 -109.5200       5.5        46       114        60
OIR    2025250     91400   21.5600 -109.5300       5.1        47       114        60
OIR    2025250     91400   21.5600 -109.5400       4.7        47       116        60
OIR    2025250     91400   21.5600 -109.5500       4.4        48       116        60
OIR    2025250     91400   21.5600 -109.5600       4.0        48       117        60
OIR    2025250     91400   21.5500 -108.6100       7.3        48       110        60
OIR    2025250     91400   21.5500 -108.6200       7.3        48       109        60
OIR    2025250     91400   21.5500 -108.6300       7.3        48       109        60
OIR    2025250     91400   21.5500 -108.6400       7.3        48       109        60
OIR    2025250     91400   21.5500 -108.6500       7.3        47       109        60
OIR    2025250     91400   21.5500 -108.6600       7.3        47       108        60
OIR    2025250     91400   21.5500 -108.6700       7.4        47       108        60
OIR    2025250     91400   21.5500 -108.6800       7.4        46       108        60
OIR    2025250     91400   21.5500 -108.6900       7.4        46       107        60
OIR    2025250     91400   21.5500 -108.7000       7.4        46       107        60
OIR    2025250     91400   21.5500 -108.7100       7.5        45       107        60
OIR    2025250     91400   21.5500 -108.7200       7.5        45       105        60
OIR    2025250     91400   21.5500 -108.7300       7.5        44       105        60
OIR    2025250     91400   21.5500 -108.7400       7.6        44       104        60
OIR    2025250     91400   21.5500 -108.7500       7.6        44       104        60
OIR    2025250     91400   21.5500 -108.7600       7.6        44       103        60
OIR    2025250     91400   21.5500 -108.7700       7.6        44       103        60
OIR    2025250     91400   21.5500 -108.7800       7.6        44       103        60
OIR    2025250     91400   21.5500 -108.7900       7.6        44       104        60
OIR    2025250     91400   21.5500 -108.8000       7.7        44       104        60
OIR    2025250     91400   21.5500 -108.8100       7.7        44       104        60
OIR    2025250     91400   21.5500 -108.8200       7.7        44       104        60
OIR    2025250     91400   21.5500 -108.8300       7.7        43       104        60
OIR    2025250     91400   21.5500 -108.8400       7.7        43       104        60
OIR    2025250     91400   21.5500 -108.8500       7.7        43       105        60
OIR    2025250     91400   21.5500 -108.8600       7.7        43       105        60
OIR    2025250     91400   21.5500 -108.8700       7.7        43       104        60
OIR    2025250     91400   21.5500 -108.8800       7.7        43       104        60
OIR    2025250     91400   21.5500 -108.8900       7.7        43       104        60
OIR    2025250     91400   21.5500 -108.9000       7.7        43       107        60
OIR    2025250     91400   21.5500 -108.9100       7.7        43       109        60
OIR    2025250     91400   21.5500 -108.9200       7.7        43       110        60
OIR    2025250     91400   21.5500 -108.9300       7.7        43       110        60
OIR    2025250     91400   21.5500 -108.9400       7.7        43       109        60
OIR    2025250     91400   21.5500 -108.9500       7.7        43       109        60
OIR    2025250     91400   21.5500 -108.9600       7.7        43       108        60
OIR    2025250     91400   21.5500 -108.9700       7.7        43       107        60
OIR    2025250     91400   21.5500 -108.9800       7.7        43       105        60
OIR    2025250     91400   21.5500 -108.9900       7.7        43       107        60
OIR    2025250     91400   21.5500 -109.0000       7.6        43       108        60
OIR    2025250     91400   21.5500 -109.0100       7.6        43       109        60
OIR    2025250     91400   21.5500 -109.0200       7.6        43       110        60
OIR    2025250     91400   21.5500 -109.0300       7.6        43       111        60
OIR    2025250     91400   21.5500 -109.0400       7.6        43       111        60
OIR    2025250     91400   21.5500 -109.0500       7.6        43       111        60
OIR    2025250     91400   21.5500 -109.0600       7.6        43       110        60
OIR    2025250     91400   21.5500 -109.0700       7.6        43       110        60
OIR    2025250     91400   21.5500 -109.0800       7.6        43       109        60
OIR    2025250     91400   21.5500 -109.0900       7.6        43       109        60
OIR    2025250     91400   21.5500 -109.1000       7.6        43       110        60
OIR    2025250     91400   21.5500 -109.1100       7.6        43       112        60
OIR    2025250     91400   21.5500 -109.1200       7.6        43       112        60
OIR    2025250     91400   21.5500 -109.1300       7.6        43       112        60
OIR    2025250     91400   21.5500 -109.1400       7.6        43       111        60
OIR    2025250     91400   21.5500 -109.1500       7.6        43       111        60
OIR    2025250     91400   21.5500 -109.1600       7.6        43       111        60
OIR    2025250     91400   21.5500 -109.1700       7.6        43       110        60
OIR    2025250     91400   21.5500 -109.1800       7.6        43       109        60
OIR    2025250     91400   21.5500 -109.1900       7.6        43       108        60
OIR    2025250     91400   21.5500 -109.2000       7.6        43       107        60
OIR    2025250     91400   21.5500 -109.2100       7.5        43       105        60
OIR    2025250     91400   21.5500 -109.2200       7.5        43       104        60
OIR    2025250     91400   21.5500 -109.2300       7.5        43       105        60
OIR    2025250     91400   21.5500 -109.2400       7.5        43       107        60
OIR    2025250     91400   21.5500 -109.2500       7.4        44       108        60
OIR    2025250     91400   21.5500 -109.2600       7.4        44       109        60
OIR    2025250     91400   21.5500 -109.2700       7.3        44       110        60
OIR    2025250     91400   21.5500 -109.2800       7.3        44       110        60
OIR    2025250     91400   21.5500 -109.2900       7.2        44       111        60
OIR    2025250     91400   21.5500 -109.3000       7.1        44       111        60
OIR    2025250     91400   21.5500 -109.3100       7.1        44       111        60
OIR    2025250     91400   21.5500 -109.3200       7.0        45       112        60
OIR    2025250     91400   21.5500 -109.3300       6.8        45       112        60
OIR    2025250     91400   21.5500 -109.3400       6.8        45       113        60
OIR    2025250     91400   21.5500 -109.3500       6.7        46       112        60
OIR    2025250     91400   21.5500 -109.3600       6.6        46       111        60
OIR    2025250     91400   21.5500 -109.3700       6.6        46       112        60
OIR    2025250     91400   21.5500 -109.3800       6.6        46       112        60
OIR    2025250     91400   21.5500 -109.3900       6.5        46       113        60
OIR    2025250     91400   21.5500 -109.4000       6.5        46       113        60
OIR    2025250     91400   21.5500 -109.4100       6.5        46       114        60
OIR    2025250     91400   21.5500 -109.4200       6.4        46       113        60
OIR    2025250     91400   21.5500 -109.4300       6.4        46       113        60
OIR    2025250     91400   21.5500 -109.4400       6.4        45       113        60
OIR    2025250     91400   21.5500 -109.4500       6.4        45       114        60
OIR    2025250     91400   21.5500 -109.4600       6.3        45       115        60
OIR    2025250     91400   21.5500 -109.4700       6.3        45       116        60
OIR    2025250     91400   21.5500 -109.4800       6.3        46       116        60
OIR    2025250     91400   21.5500 -109.4900       6.2        46       116        60
OIR    2025250     91400   21.5500 -109.5000       6.0        46       115        60
OIR    2025250     91400   21.5500 -109.5100       5.7        46       115        60
OIR    2025250     91400   21.5500 -109.5200       5.3        47       114        60
OIR    2025250     91400   21.5500 -109.5300       4.8        48       114        60
OIR    2025250     91400   21.5500 -109.5400       4.5        48       115        60
OIR    2025250     91400   21.5500 -109.5500       4.2        48       116        60
OIR    2025250     91400   21.5400 -108.6100       7.3        48       110        60
OIR    2025250     91400   21.5400 -108.6200       7.3        48       110        60
OIR    2025250     91400   21.5400 -108.6300       7.3        48       110        60
OIR    2025250     91400   21.5400 -108.6400       7.3        48       110        60
OIR    2025250     91400   21.5400 -108.6500       7.3        48       110        60
OIR    2025250     91400   21.5400 -108.6600       7.3        48       109        60
OIR    2025250     91400   21.5400 -108.6700       7.3        47       109        60
OIR    2025250     91400   21.5400 -108.6800       7.4        47       108        60
OIR    2025250     91400   21.5400 -108.6900       7.4        47       107        60
OIR    2025250     91400   21.5400 -108.7000       7.4        47       107        60
OIR    2025250     91400   21.5400 -108.7100       7.4        46       107        60
OIR    2025250     91400   21.5400 -108.7200       7.5        46       107        60
OIR    2025250     91400   21.5400 -108.7300       7.5        45       107        60
OIR    2025250     91400   21.5400 -108.7400       7.5        45       107        60
OIR    2025250     91400   21.5400 -108.7500       7.6        44       107        60
OIR    2025250     91400   21.5400 -108.7600       7.6        44       105        60
OIR    2025250     91400   21.5400 -108.7700       7.6        44       104        60
OIR    2025250     91400   21.5400 -108.7800       7.6        44       104        60
OIR    2025250     91400   21.5400 -108.7900       7.7        44       104        60
OIR    2025250     91400   21.5400 -108.8000       7.7        44       104        60
OIR    2025250     91400   21.5400 -108.8100       7.7        44       104        60
OIR    2025250     91400   21.5400 -108.8200       7.7        44       104        60
OIR    2025250     91400   21.5400 -108.8300       7.7        44       104        60
OIR    2025250     91400   21.5400 -108.8400       7.7        44       104        60
OIR    2025250     91400   21.5400 -108.8500       7.7        44       104        60
OIR    2025250     91400   21.5400 -108.8600       7.7        43       104        60
OIR    2025250     91400   21.5400 -108.8700       7.7        43       104        60
OIR    2025250     91400   21.5400 -108.8800       7.7        43       104        60
OIR    2025250     91400   21.5400 -108.8900       7.7        43       104        60
OIR    2025250     91400   21.5400 -108.9000       7.7        43       105        60
OIR    2025250     91400   21.5400 -108.9100       7.7        43       108        60
OIR    2025250     91400   21.5400 -108.9200       7.7        43       110        60
OIR    2025250     91400   21.5400 -108.9300       7.7        43       110        60
OIR    2025250     91400   21.5400 -108.9400       7.7        43       109        60
OIR    2025250     91400   21.5400 -108.9500       7.7        43       108        60
OIR    2025250     91400   21.5400 -108.9600       7.7        43       107        60
OIR    2025250     91400   21.5400 -108.9700       7.7        43       105        60
OIR    2025250     91400   21.5400 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.5400 -108.9900       7.7        43       104        60
OIR    2025250     91400   21.5400 -109.0000       7.7        43       104        60
OIR    2025250     91400   21.5400 -109.0100       7.6        43       105        60
OIR    2025250     91400   21.5400 -109.0200       7.6        43       107        60
OIR    2025250     91400   21.5400 -109.0300       7.6        43       108        60
OIR    2025250     91400   21.5400 -109.0400       7.6        43       108        60
OIR    2025250     91400   21.5400 -109.0500       7.6        43       108        60
OIR    2025250     91400   21.5400 -109.0600       7.6        43       108        60
OIR    2025250     91400   21.5400 -109.0700       7.6        43       108        60
OIR    2025250     91400   21.5400 -109.0800       7.6        43       107        60
OIR    2025250     91400   21.5400 -109.0900       7.6        43       105        60
OIR    2025250     91400   21.5400 -109.1000       7.6        43       107        60
OIR    2025250     91400   21.5400 -109.1100       7.6        43       109        60
OIR    2025250     91400   21.5400 -109.1200       7.6        43       109        60
OIR    2025250     91400   21.5400 -109.1300       7.6        43       109        60
OIR    2025250     91400   21.5400 -109.1400       7.6        43       109        60
OIR    2025250     91400   21.5400 -109.1500       7.6        43       109        60
OIR    2025250     91400   21.5400 -109.1600       7.6        43       108        60
OIR    2025250     91400   21.5400 -109.1700       7.6        43       108        60
OIR    2025250     91400   21.5400 -109.1800       7.6        43       107        60
OIR    2025250     91400   21.5400 -109.1900       7.6        43       105        60
OIR    2025250     91400   21.5400 -109.2000       7.6        43       104        60
OIR    2025250     91400   21.5400 -109.2100       7.5        43       104        60
OIR    2025250     91400   21.5400 -109.2200       7.5        43       104        60
OIR    2025250     91400   21.5400 -109.2300       7.5        44       104        60
OIR    2025250     91400   21.5400 -109.2400       7.5        44       104        60
OIR    2025250     91400   21.5400 -109.2500       7.4        44       105        60
OIR    2025250     91400   21.5400 -109.2600       7.4        44       108        60
OIR    2025250     91400   21.5400 -109.2700       7.3        44       108        60
OIR    2025250     91400   21.5400 -109.2800       7.3        44       108        60
OIR    2025250     91400   21.5400 -109.2900       7.2        45       107        60
OIR    2025250     91400   21.5400 -109.3000       7.1        45       108        60
OIR    2025250     91400   21.5400 -109.3100       7.0        45       109        60
OIR    2025250     91400   21.5400 -109.3200       6.9        45       110        60
OIR    2025250     91400   21.5400 -109.3300       6.8        45       112        60
OIR    2025250     91400   21.5400 -109.3400       6.7        46       113        60
OIR    2025250     91400   21.5400 -109.3500       6.7        46       112        60
OIR    2025250     91400   21.5400 -109.3600       6.6        46       112        60
OIR    2025250     91400   21.5400 -109.3700       6.6        46       112        60
OIR    2025250     91400   21.5400 -109.3800       6.5        46       112        60
OIR    2025250     91400   21.5400 -109.3900       6.5        46       113        60
OIR    2025250     91400   21.5400 -109.4000       6.5        46       113        60
OIR    2025250     91400   21.5400 -109.4100       6.4        46       113        60
OIR    2025250     91400   21.5400 -109.4200       6.4        46       113        60
OIR    2025250     91400   21.5400 -109.4300       6.4        46       113        60
OIR    2025250     91400   21.5400 -109.4400       6.4        45       113        60
OIR    2025250     91400   21.5400 -109.4500       6.4        45       115        60
OIR    2025250     91400   21.5400 -109.4600       6.3        45       116        60
OIR    2025250     91400   21.5400 -109.4700       6.3        45       117        60
OIR    2025250     91400   21.5400 -109.4800       6.3        45       117        60
OIR    2025250     91400   21.5400 -109.4900       6.2        46       117        60
OIR    2025250     91400   21.5400 -109.5000       6.0        46       116        60
OIR    2025250     91400   21.5400 -109.5100       5.6        46       116        60
OIR    2025250     91400   21.5400 -109.5200       5.1        47       115        60
OIR    2025250     91400   21.5400 -109.5300       4.6        48       115        60
OIR    2025250     91400   21.5400 -109.5400       4.3        49       114        60
OIR    2025250     91400   21.5400 -109.5500       4.0        49       116        60
OIR    2025250     91400   21.5300 -108.6100       7.3        48       112        60
OIR    2025250     91400   21.5300 -108.6200       7.3        48       112        60
OIR    2025250     91400   21.5300 -108.6300       7.3        48       112        60
OIR    2025250     91400   21.5300 -108.6400       7.3        48       112        60
OIR    2025250     91400   21.5300 -108.6500       7.3        48       111        60
OIR    2025250     91400   21.5300 -108.6600       7.3        48       110        60
OIR    2025250     91400   21.5300 -108.6700       7.3        48       110        60
OIR    2025250     91400   21.5300 -108.6800       7.3        48       109        60
OIR    2025250     91400   21.5300 -108.6900       7.3        48       107        60
OIR    2025250     91400   21.5300 -108.7000       7.4        48       107        60
OIR    2025250     91400   21.5300 -108.7100       7.4        47       105        60
OIR    2025250     91400   21.5300 -108.7200       7.4        47       105        60
OIR    2025250     91400   21.5300 -108.7300       7.4        46       108        60
OIR    2025250     91400   21.5300 -108.7400       7.5        46       109        60
OIR    2025250     91400   21.5300 -108.7500       7.5        45       109        60
OIR    2025250     91400   21.5300 -108.7600       7.6        45       109        60
OIR    2025250     91400   21.5300 -108.7700       7.6        44       108        60
OIR    2025250     91400   21.5300 -108.7800       7.6        44       107        60
OIR    2025250     91400   21.5300 -108.7900       7.7        44       105        60
OIR    2025250     91400   21.5300 -108.8000       7.7        44       104        60
OIR    2025250     91400   21.5300 -108.8100       7.7        44       104        60
OIR    2025250     91400   21.5300 -108.8200       7.7        44       104        60
OIR    2025250     91400   21.5300 -108.8300       7.7        44       104        60
OIR    2025250     91400   21.5300 -108.8400       7.7        44       105        60
OIR    2025250     91400   21.5300 -108.8500       7.7        44       105        60
OIR    2025250     91400   21.5300 -108.8600       7.7        44       105        60
OIR    2025250     91400   21.5300 -108.8700       7.7        44       104        60
OIR    2025250     91400   21.5300 -108.8800       7.7        43       105        60
OIR    2025250     91400   21.5300 -108.8900       7.7        43       105        60
OIR    2025250     91400   21.5300 -108.9000       7.7        43       108        60
OIR    2025250     91400   21.5300 -108.9100       7.7        43       109        60
OIR    2025250     91400   21.5300 -108.9200       7.7        43       111        60
OIR    2025250     91400   21.5300 -108.9300       7.7        43       110        60
OIR    2025250     91400   21.5300 -108.9400       7.7        43       109        60
OIR    2025250     91400   21.5300 -108.9500       7.7        43       108        60
OIR    2025250     91400   21.5300 -108.9600       7.7        43       105        60
OIR    2025250     91400   21.5300 -108.9700       7.7        43       104        60
OIR    2025250     91400   21.5300 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.5300 -108.9900       7.7        43       104        60
OIR    2025250     91400   21.5300 -109.0000       7.7        43       104        60
OIR    2025250     91400   21.5300 -109.0100       7.7        43       105        60
OIR    2025250     91400   21.5300 -109.0200       7.6        43       105        60
OIR    2025250     91400   21.5300 -109.0300       7.6        43       107        60
OIR    2025250     91400   21.5300 -109.0400       7.7        43       107        60
OIR    2025250     91400   21.5300 -109.0500       7.7        43       107        60
OIR    2025250     91400   21.5300 -109.0600       7.7        43       107        60
OIR    2025250     91400   21.5300 -109.0700       7.7        43       107        60
OIR    2025250     91400   21.5300 -109.0800       7.7        43       105        60
OIR    2025250     91400   21.5300 -109.0900       7.6        43       104        60
OIR    2025250     91400   21.5300 -109.1000       7.6        43       104        60
OIR    2025250     91400   21.5300 -109.1100       7.6        43       105        60
OIR    2025250     91400   21.5300 -109.1200       7.6        43       107        60
OIR    2025250     91400   21.5300 -109.1300       7.6        43       107        60
OIR    2025250     91400   21.5300 -109.1400       7.6        43       107        60
OIR    2025250     91400   21.5300 -109.1500       7.6        43       107        60
OIR    2025250     91400   21.5300 -109.1600       7.6        43       105        60
OIR    2025250     91400   21.5300 -109.1700       7.6        43       105        60
OIR    2025250     91400   21.5300 -109.1800       7.6        43       104        60
OIR    2025250     91400   21.5300 -109.1900       7.6        43       103        60
OIR    2025250     91400   21.5300 -109.2000       7.6        43       103        60
OIR    2025250     91400   21.5300 -109.2100       7.5        43       103        60
OIR    2025250     91400   21.5300 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.5300 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.5300 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.5300 -109.2500       7.4        44       104        60
OIR    2025250     91400   21.5300 -109.2600       7.3        44       105        60
OIR    2025250     91400   21.5300 -109.2700       7.3        44       107        60
OIR    2025250     91400   21.5300 -109.2800       7.2        45       105        60
OIR    2025250     91400   21.5300 -109.2900       7.2        45       104        60
OIR    2025250     91400   21.5300 -109.3000       7.1        45       104        60
OIR    2025250     91400   21.5300 -109.3100       7.0        45       107        60
OIR    2025250     91400   21.5300 -109.3200       6.9        46       109        60
OIR    2025250     91400   21.5300 -109.3300       6.7        46       111        60
OIR    2025250     91400   21.5300 -109.3400       6.6        46       113        60
OIR    2025250     91400   21.5300 -109.3500       6.6        46       113        60
OIR    2025250     91400   21.5300 -109.3600       6.6        46       112        60
OIR    2025250     91400   21.5300 -109.3700       6.5        46       112        60
OIR    2025250     91400   21.5300 -109.3800       6.5        46       112        60
OIR    2025250     91400   21.5300 -109.3900       6.5        46       112        60
OIR    2025250     91400   21.5300 -109.4000       6.4        46       112        60
OIR    2025250     91400   21.5300 -109.4100       6.4        46       111        60
OIR    2025250     91400   21.5300 -109.4200       6.4        46       111        60
OIR    2025250     91400   21.5300 -109.4300       6.4        46       112        60
OIR    2025250     91400   21.5300 -109.4400       6.4        45       112        60
OIR    2025250     91400   21.5300 -109.4500       6.4        45       114        60
OIR    2025250     91400   21.5300 -109.4600       6.3        45       116        60
OIR    2025250     91400   21.5300 -109.4700       6.3        45       116        60
OIR    2025250     91400   21.5300 -109.4800       6.3        45       116        60
OIR    2025250     91400   21.5300 -109.4900       6.2        45       116        60
OIR    2025250     91400   21.5300 -109.5000       6.0        45       115        60
OIR    2025250     91400   21.5300 -109.5100       5.5        46       115        60
OIR    2025250     91400   21.5300 -109.5200       4.8        48       114        60
OIR    2025250     91400   21.5300 -109.5300       4.4        49       115        60
OIR    2025250     91400   21.5300 -109.5400       4.1        49       115        60
OIR    2025250     91400   21.5200 -108.6100       7.3        48       115        60
OIR    2025250     91400   21.5200 -108.6200       7.3        48       114        60
OIR    2025250     91400   21.5200 -108.6300       7.3        48       114        60
OIR    2025250     91400   21.5200 -108.6400       7.3        48       113        60
OIR    2025250     91400   21.5200 -108.6500       7.3        48       113        60
OIR    2025250     91400   21.5200 -108.6600       7.3        48       112        60
OIR    2025250     91400   21.5200 -108.6700       7.3        48       111        60
OIR    2025250     91400   21.5200 -108.6800       7.3        48       111        60
OIR    2025250     91400   21.5200 -108.6900       7.3        48       110        60
OIR    2025250     91400   21.5200 -108.7000       7.3        48       109        60
OIR    2025250     91400   21.5200 -108.7100       7.3        48       109        60
OIR    2025250     91400   21.5200 -108.7200       7.4        48       109        60
OIR    2025250     91400   21.5200 -108.7300       7.4        48       110        60
OIR    2025250     91400   21.5200 -108.7400       7.4        47       110        60
OIR    2025250     91400   21.5200 -108.7500       7.5        46       110        60
OIR    2025250     91400   21.5200 -108.7600       7.5        46       110        60
OIR    2025250     91400   21.5200 -108.7700       7.6        45       110        60
OIR    2025250     91400   21.5200 -108.7800       7.6        45       108        60
OIR    2025250     91400   21.5200 -108.7900       7.6        44       107        60
OIR    2025250     91400   21.5200 -108.8000       7.7        44       105        60
OIR    2025250     91400   21.5200 -108.8100       7.7        44       104        60
OIR    2025250     91400   21.5200 -108.8200       7.7        44       104        60
OIR    2025250     91400   21.5200 -108.8300       7.7        44       104        60
OIR    2025250     91400   21.5200 -108.8400       7.7        44       107        60
OIR    2025250     91400   21.5200 -108.8500       7.7        44       107        60
OIR    2025250     91400   21.5200 -108.8600       7.7        44       105        60
OIR    2025250     91400   21.5200 -108.8700       7.7        44       104        60
OIR    2025250     91400   21.5200 -108.8800       7.7        44       105        60
OIR    2025250     91400   21.5200 -108.8900       7.7        44       107        60
OIR    2025250     91400   21.5200 -108.9000       7.7        44       109        60
OIR    2025250     91400   21.5200 -108.9100       7.7        43       110        60
OIR    2025250     91400   21.5200 -108.9200       7.7        43       111        60
OIR    2025250     91400   21.5200 -108.9300       7.7        43       111        60
OIR    2025250     91400   21.5200 -108.9400       7.7        43       110        60
OIR    2025250     91400   21.5200 -108.9500       7.7        43       108        60
OIR    2025250     91400   21.5200 -108.9600       7.7        43       105        60
OIR    2025250     91400   21.5200 -108.9700       7.7        43       104        60
OIR    2025250     91400   21.5200 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.5200 -108.9900       7.7        43       104        60
OIR    2025250     91400   21.5200 -109.0000       7.7        43       105        60
OIR    2025250     91400   21.5200 -109.0100       7.7        43       105        60
OIR    2025250     91400   21.5200 -109.0200       7.7        43       104        60
OIR    2025250     91400   21.5200 -109.0300       7.7        43       105        60
OIR    2025250     91400   21.5200 -109.0400       7.7        43       105        60
OIR    2025250     91400   21.5200 -109.0500       7.7        43       105        60
OIR    2025250     91400   21.5200 -109.0600       7.7        43       105        60
OIR    2025250     91400   21.5200 -109.0700       7.7        43       105        60
OIR    2025250     91400   21.5200 -109.0800       7.7        43       104        60
OIR    2025250     91400   21.5200 -109.0900       7.7        43       104        60
OIR    2025250     91400   21.5200 -109.1000       7.7        43       104        60
OIR    2025250     91400   21.5200 -109.1100       7.6        43       104        60
OIR    2025250     91400   21.5200 -109.1200       7.6        43       105        60
OIR    2025250     91400   21.5200 -109.1300       7.6        43       107        60
OIR    2025250     91400   21.5200 -109.1400       7.6        43       107        60
OIR    2025250     91400   21.5200 -109.1500       7.6        43       107        60
OIR    2025250     91400   21.5200 -109.1600       7.6        43       105        60
OIR    2025250     91400   21.5200 -109.1700       7.6        43       105        60
OIR    2025250     91400   21.5200 -109.1800       7.6        43       104        60
OIR    2025250     91400   21.5200 -109.1900       7.6        43       104        60
OIR    2025250     91400   21.5200 -109.2000       7.6        43       103        60
OIR    2025250     91400   21.5200 -109.2100       7.5        43       103        60
OIR    2025250     91400   21.5200 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.5200 -109.2300       7.5        44       104        60
OIR    2025250     91400   21.5200 -109.2400       7.4        44       104        60
OIR    2025250     91400   21.5200 -109.2500       7.4        44       104        60
OIR    2025250     91400   21.5200 -109.2600       7.3        44       107        60
OIR    2025250     91400   21.5200 -109.2700       7.3        45       108        60
OIR    2025250     91400   21.5200 -109.2800       7.2        45       108        60
OIR    2025250     91400   21.5200 -109.2900       7.1        45       107        60
OIR    2025250     91400   21.5200 -109.3000       7.0        45       107        60
OIR    2025250     91400   21.5200 -109.3100       6.9        46       109        60
OIR    2025250     91400   21.5200 -109.3200       6.8        46       110        60
OIR    2025250     91400   21.5200 -109.3300       6.7        46       112        60
OIR    2025250     91400   21.5200 -109.3400       6.6        47       114        60
OIR    2025250     91400   21.5200 -109.3500       6.6        47       114        60
OIR    2025250     91400   21.5200 -109.3600       6.5        47       113        60
OIR    2025250     91400   21.5200 -109.3700       6.5        47       112        60
OIR    2025250     91400   21.5200 -109.3800       6.5        47       112        60
OIR    2025250     91400   21.5200 -109.3900       6.5        47       111        60
OIR    2025250     91400   21.5200 -109.4000       6.4        46       111        60
OIR    2025250     91400   21.5200 -109.4100       6.4        46       110        60
OIR    2025250     91400   21.5200 -109.4200       6.4        46       110        60
OIR    2025250     91400   21.5200 -109.4300       6.4        46       110        60
OIR    2025250     91400   21.5200 -109.4400       6.4        45       111        60
OIR    2025250     91400   21.5200 -109.4500       6.4        45       112        60
OIR    2025250     91400   21.5200 -109.4600       6.3        45       114        60
OIR    2025250     91400   21.5200 -109.4700       6.3        45       116        60
OIR    2025250     91400   21.5200 -109.4800       6.3        45       115        60
OIR    2025250     91400   21.5200 -109.4900       6.2        45       114        60
OIR    2025250     91400   21.5200 -109.5000       6.0        45       113        60
OIR    2025250     91400   21.5200 -109.5100       5.4        46       113        60
OIR    2025250     91400   21.5200 -109.5200       4.6        48       113        60
OIR    2025250     91400   21.5200 -109.5300       4.1        49       114        60
OIR    2025250     91400   21.5100 -108.6100       7.3        48       117        60
OIR    2025250     91400   21.5100 -108.6200       7.3        48       116        60
OIR    2025250     91400   21.5100 -108.6300       7.3        48       116        60
OIR    2025250     91400   21.5100 -108.6400       7.3        48       115        60
OIR    2025250     91400   21.5100 -108.6500       7.3        48       114        60
OIR    2025250     91400   21.5100 -108.6600       7.3        48       114        60
OIR    2025250     91400   21.5100 -108.6700       7.3        48       113        60
OIR    2025250     91400   21.5100 -108.6800       7.3        48       112        60
OIR    2025250     91400   21.5100 -108.6900       7.3        49       112        60
OIR    2025250     91400   21.5100 -108.7000       7.3        49       111        60
OIR    2025250     91400   21.5100 -108.7100       7.3        49       112        60
OIR    2025250     91400   21.5100 -108.7200       7.3        49       112        60
OIR    2025250     91400   21.5100 -108.7300       7.3        49       112        60
OIR    2025250     91400   21.5100 -108.7400       7.4        48       112        60
OIR    2025250     91400   21.5100 -108.7500       7.4        47       112        60
OIR    2025250     91400   21.5100 -108.7600       7.5        47       111        60
OIR    2025250     91400   21.5100 -108.7700       7.6        46       111        60
OIR    2025250     91400   21.5100 -108.7800       7.6        45       109        60
OIR    2025250     91400   21.5100 -108.7900       7.6        45       107        60
OIR    2025250     91400   21.5100 -108.8000       7.6        45       104        60
OIR    2025250     91400   21.5100 -108.8100       7.7        44       104        60
OIR    2025250     91400   21.5100 -108.8200       7.7        44       104        60
OIR    2025250     91400   21.5100 -108.8300       7.7        44       104        60
OIR    2025250     91400   21.5100 -108.8400       7.7        44       105        60
OIR    2025250     91400   21.5100 -108.8500       7.7        44       107        60
OIR    2025250     91400   21.5100 -108.8600       7.7        44       107        60
OIR    2025250     91400   21.5100 -108.8700       7.7        44       105        60
OIR    2025250     91400   21.5100 -108.8800       7.7        44       105        60
OIR    2025250     91400   21.5100 -108.8900       7.7        44       108        60
OIR    2025250     91400   21.5100 -108.9000       7.7        44       109        60
OIR    2025250     91400   21.5100 -108.9100       7.7        44       110        60
OIR    2025250     91400   21.5100 -108.9200       7.7        43       111        60
OIR    2025250     91400   21.5100 -108.9300       7.7        43       111        60
OIR    2025250     91400   21.5100 -108.9400       7.7        43       110        60
OIR    2025250     91400   21.5100 -108.9500       7.7        43       109        60
OIR    2025250     91400   21.5100 -108.9600       7.7        43       107        60
OIR    2025250     91400   21.5100 -108.9700       7.7        43       104        60
OIR    2025250     91400   21.5100 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.5100 -108.9900       7.7        43       104        60
OIR    2025250     91400   21.5100 -109.0000       7.7        43       105        60
OIR    2025250     91400   21.5100 -109.0100       7.7        43       105        60
OIR    2025250     91400   21.5100 -109.0200       7.7        43       105        60
OIR    2025250     91400   21.5100 -109.0300       7.7        43       105        60
OIR    2025250     91400   21.5100 -109.0400       7.7        43       107        60
OIR    2025250     91400   21.5100 -109.0500       7.7        43       107        60
OIR    2025250     91400   21.5100 -109.0600       7.7        43       105        60
OIR    2025250     91400   21.5100 -109.0700       7.7        43       105        60
OIR    2025250     91400   21.5100 -109.0800       7.7        43       104        60
OIR    2025250     91400   21.5100 -109.0900       7.7        43       104        60
OIR    2025250     91400   21.5100 -109.1000       7.7        43       104        60
OIR    2025250     91400   21.5100 -109.1100       7.7        43       104        60
OIR    2025250     91400   21.5100 -109.1200       7.6        43       105        60
OIR    2025250     91400   21.5100 -109.1300       7.6        43       105        60
OIR    2025250     91400   21.5100 -109.1400       7.6        43       107        60
OIR    2025250     91400   21.5100 -109.1500       7.6        43       107        60
OIR    2025250     91400   21.5100 -109.1600       7.6        43       105        60
OIR    2025250     91400   21.5100 -109.1700       7.6        43       104        60
OIR    2025250     91400   21.5100 -109.1800       7.6        43       104        60
OIR    2025250     91400   21.5100 -109.1900       7.6        43       104        60
OIR    2025250     91400   21.5100 -109.2000       7.6        43       103        60
OIR    2025250     91400   21.5100 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.5100 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.5100 -109.2300       7.5        44       104        60
OIR    2025250     91400   21.5100 -109.2400       7.5        44       104        60
OIR    2025250     91400   21.5100 -109.2500       7.4        44       105        60
OIR    2025250     91400   21.5100 -109.2600       7.3        44       108        60
OIR    2025250     91400   21.5100 -109.2700       7.3        45       109        60
OIR    2025250     91400   21.5100 -109.2800       7.2        45       110        60
OIR    2025250     91400   21.5100 -109.2900       7.1        46       109        60
OIR    2025250     91400   21.5100 -109.3000       7.0        46       109        60
OIR    2025250     91400   21.5100 -109.3100       6.8        46       111        60
OIR    2025250     91400   21.5100 -109.3200       6.7        47       113        60
OIR    2025250     91400   21.5100 -109.3300       6.6        47       114        60
OIR    2025250     91400   21.5100 -109.3400       6.6        47       115        60
OIR    2025250     91400   21.5100 -109.3500       6.5        47       115        60
OIR    2025250     91400   21.5100 -109.3600       6.5        47       114        60
OIR    2025250     91400   21.5100 -109.3700       6.5        47       113        60
OIR    2025250     91400   21.5100 -109.3800       6.5        47       112        60
OIR    2025250     91400   21.5100 -109.3900       6.4        47       111        60
OIR    2025250     91400   21.5100 -109.4000       6.4        47       110        60
OIR    2025250     91400   21.5100 -109.4100       6.4        46       110        60
OIR    2025250     91400   21.5100 -109.4200       6.4        46       109        60
OIR    2025250     91400   21.5100 -109.4300       6.4        46       110        60
OIR    2025250     91400   21.5100 -109.4400       6.4        45       110        60
OIR    2025250     91400   21.5100 -109.4500       6.3        45       110        60
OIR    2025250     91400   21.5100 -109.4600       6.3        45       112        60
OIR    2025250     91400   21.5100 -109.4700       6.3        45       114        60
OIR    2025250     91400   21.5100 -109.4800       6.3        45       114        60
OIR    2025250     91400   21.5100 -109.4900       6.2        44       113        60
OIR    2025250     91400   21.5100 -109.5000       6.0        44       113        60
OIR    2025250     91400   21.5100 -109.5100       5.2        46       113        60
OIR    2025250     91400   21.5100 -109.5200       4.2        49       113        60
OIR    2025250     91400   21.5000 -108.6100       7.3        48       121        60
OIR    2025250     91400   21.5000 -108.6200       7.3        48       120        60
OIR    2025250     91400   21.5000 -108.6300       7.3        48       119        60
OIR    2025250     91400   21.5000 -108.6400       7.3        48       116        60
OIR    2025250     91400   21.5000 -108.6500       7.3        48       116        60
OIR    2025250     91400   21.5000 -108.6600       7.3        48       115        60
OIR    2025250     91400   21.5000 -108.6700       7.3        48       114        60
OIR    2025250     91400   21.5000 -108.6800       7.3        49       113        60
OIR    2025250     91400   21.5000 -108.6900       7.3        49       113        60
OIR    2025250     91400   21.5000 -108.7000       7.3        49       113        60
OIR    2025250     91400   21.5000 -108.7100       7.3        49       114        60
OIR    2025250     91400   21.5000 -108.7200       7.3        49       114        60
OIR    2025250     91400   21.5000 -108.7300       7.3        49       114        60
OIR    2025250     91400   21.5000 -108.7400       7.3        49       114        60
OIR    2025250     91400   21.5000 -108.7500       7.4        48       113        60
OIR    2025250     91400   21.5000 -108.7600       7.5        48       112        60
OIR    2025250     91400   21.5000 -108.7700       7.5        47       111        60
OIR    2025250     91400   21.5000 -108.7800       7.6        46       110        60
OIR    2025250     91400   21.5000 -108.7900       7.6        46       109        60
OIR    2025250     91400   21.5000 -108.8000       7.6        45       107        60
OIR    2025250     91400   21.5000 -108.8100       7.6        45       105        60
OIR    2025250     91400   21.5000 -108.8200       7.6        45       104        60
OIR    2025250     91400   21.5000 -108.8300       7.6        44       104        60
OIR    2025250     91400   21.5000 -108.8400       7.7        44       105        60
OIR    2025250     91400   21.5000 -108.8500       7.7        44       107        60
OIR    2025250     91400   21.5000 -108.8600       7.7        44       107        60
OIR    2025250     91400   21.5000 -108.8700       7.7        44       107        60
OIR    2025250     91400   21.5000 -108.8800       7.7        44       107        60
OIR    2025250     91400   21.5000 -108.8900       7.7        44       108        60
OIR    2025250     91400   21.5000 -108.9000       7.7        44       109        60
OIR    2025250     91400   21.5000 -108.9100       7.7        44       110        60
OIR    2025250     91400   21.5000 -108.9200       7.7        43       111        60
OIR    2025250     91400   21.5000 -108.9300       7.7        43       112        60
OIR    2025250     91400   21.5000 -108.9400       7.7        43       111        60
OIR    2025250     91400   21.5000 -108.9500       7.7        43       110        60
OIR    2025250     91400   21.5000 -108.9600       7.7        43       108        60
OIR    2025250     91400   21.5000 -108.9700       7.7        43       104        60
OIR    2025250     91400   21.5000 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.5000 -108.9900       7.7        43       104        60
OIR    2025250     91400   21.5000 -109.0000       7.7        43       105        60
OIR    2025250     91400   21.5000 -109.0100       7.7        43       105        60
OIR    2025250     91400   21.5000 -109.0200       7.7        43       107        60
OIR    2025250     91400   21.5000 -109.0300       7.7        43       107        60
OIR    2025250     91400   21.5000 -109.0400       7.7        43       107        60
OIR    2025250     91400   21.5000 -109.0500       7.7        43       108        60
OIR    2025250     91400   21.5000 -109.0600       7.7        43       107        60
OIR    2025250     91400   21.5000 -109.0700       7.7        43       105        60
OIR    2025250     91400   21.5000 -109.0800       7.7        43       104        60
OIR    2025250     91400   21.5000 -109.0900       7.7        43       104        60
OIR    2025250     91400   21.5000 -109.1000       7.7        43       104        60
OIR    2025250     91400   21.5000 -109.1100       7.7        43       104        60
OIR    2025250     91400   21.5000 -109.1200       7.6        43       105        60
OIR    2025250     91400   21.5000 -109.1300       7.6        43       105        60
OIR    2025250     91400   21.5000 -109.1400       7.6        43       105        60
OIR    2025250     91400   21.5000 -109.1500       7.6        43       105        60
OIR    2025250     91400   21.5000 -109.1600       7.6        43       104        60
OIR    2025250     91400   21.5000 -109.1700       7.6        43       104        60
OIR    2025250     91400   21.5000 -109.1800       7.6        43       104        60
OIR    2025250     91400   21.5000 -109.1900       7.6        43       103        60
OIR    2025250     91400   21.5000 -109.2000       7.6        43       103        60
OIR    2025250     91400   21.5000 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.5000 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.5000 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.5000 -109.2400       7.5        44       104        60
OIR    2025250     91400   21.5000 -109.2500       7.4        44       104        60
OIR    2025250     91400   21.5000 -109.2600       7.3        45       107        60
OIR    2025250     91400   21.5000 -109.2700       7.3        45       110        60
OIR    2025250     91400   21.5000 -109.2800       7.2        46       111        60
OIR    2025250     91400   21.5000 -109.2900       7.0        46       110        60
OIR    2025250     91400   21.5000 -109.3000       6.9        46       110        60
OIR    2025250     91400   21.5000 -109.3100       6.8        47       111        60
OIR    2025250     91400   21.5000 -109.3200       6.7        47       112        60
OIR    2025250     91400   21.5000 -109.3300       6.6        47       113        60
OIR    2025250     91400   21.5000 -109.3400       6.5        47       113        60
OIR    2025250     91400   21.5000 -109.3500       6.5        47       114        60
OIR    2025250     91400   21.5000 -109.3600       6.5        47       114        60
OIR    2025250     91400   21.5000 -109.3700       6.5        47       114        60
OIR    2025250     91400   21.5000 -109.3800       6.5        47       112        60
OIR    2025250     91400   21.5000 -109.3900       6.4        47       110        60
OIR    2025250     91400   21.5000 -109.4000       6.4        47       108        60
OIR    2025250     91400   21.5000 -109.4100       6.4        47       109        60
OIR    2025250     91400   21.5000 -109.4200       6.4        46       109        60
OIR    2025250     91400   21.5000 -109.4300       6.4        46       109        60
OIR    2025250     91400   21.5000 -109.4400       6.3        45       109        60
OIR    2025250     91400   21.5000 -109.4500       6.3        45       109        60
OIR    2025250     91400   21.5000 -109.4600       6.3        45       110        60
OIR    2025250     91400   21.5000 -109.4700       6.3        45       111        60
OIR    2025250     91400   21.5000 -109.4800       6.2        44       112        60
OIR    2025250     91400   21.5000 -109.4900       6.1        44       112        60
OIR    2025250     91400   21.5000 -109.5000       5.8        44       113        60
OIR    2025250     91400   21.5000 -109.5100       4.8        47       113        60
OIR    2025250     91400   21.5000 -109.5200       4.0        50       112        60
OIR    2025250     91400   21.4900 -108.6100       7.2        49       123        60
OIR    2025250     91400   21.4900 -108.6200       7.2        49       122        60
OIR    2025250     91400   21.4900 -108.6300       7.3        48       121        60
OIR    2025250     91400   21.4900 -108.6400       7.3        48       120        60
OIR    2025250     91400   21.4900 -108.6500       7.3        48       117        60
OIR    2025250     91400   21.4900 -108.6600       7.3        48       116        60
OIR    2025250     91400   21.4900 -108.6700       7.3        49       115        60
OIR    2025250     91400   21.4900 -108.6800       7.3        49       114        60
OIR    2025250     91400   21.4900 -108.6900       7.3        50       114        60
OIR    2025250     91400   21.4900 -108.7000       7.3        50       115        60
OIR    2025250     91400   21.4900 -108.7100       7.3        50       115        60
OIR    2025250     91400   21.4900 -108.7200       7.3        50       116        60
OIR    2025250     91400   21.4900 -108.7300       7.3        50       116        60
OIR    2025250     91400   21.4900 -108.7400       7.3        50       115        60
OIR    2025250     91400   21.4900 -108.7500       7.4        49       114        60
OIR    2025250     91400   21.4900 -108.7600       7.4        49       113        60
OIR    2025250     91400   21.4900 -108.7700       7.5        48       112        60
OIR    2025250     91400   21.4900 -108.7800       7.5        48       110        60
OIR    2025250     91400   21.4900 -108.7900       7.5        47       110        60
OIR    2025250     91400   21.4900 -108.8000       7.5        46       109        60
OIR    2025250     91400   21.4900 -108.8100       7.5        46       108        60
OIR    2025250     91400   21.4900 -108.8200       7.5        45       105        60
OIR    2025250     91400   21.4900 -108.8300       7.6        45       104        60
OIR    2025250     91400   21.4900 -108.8400       7.6        45       104        60
OIR    2025250     91400   21.4900 -108.8500       7.6        44       104        60
OIR    2025250     91400   21.4900 -108.8600       7.7        44       105        60
OIR    2025250     91400   21.4900 -108.8700       7.7        44       107        60
OIR    2025250     91400   21.4900 -108.8800       7.7        44       107        60
OIR    2025250     91400   21.4900 -108.8900       7.7        44       108        60
OIR    2025250     91400   21.4900 -108.9000       7.7        44       108        60
OIR    2025250     91400   21.4900 -108.9100       7.7        44       109        60
OIR    2025250     91400   21.4900 -108.9200       7.7        43       110        60
OIR    2025250     91400   21.4900 -108.9300       7.7        43       110        60
OIR    2025250     91400   21.4900 -108.9400       7.7        43       110        60
OIR    2025250     91400   21.4900 -108.9500       7.7        43       109        60
OIR    2025250     91400   21.4900 -108.9600       7.7        43       108        60
OIR    2025250     91400   21.4900 -108.9700       7.7        43       105        60
OIR    2025250     91400   21.4900 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.4900 -108.9900       7.7        43       104        60
OIR    2025250     91400   21.4900 -109.0000       7.7        43       105        60
OIR    2025250     91400   21.4900 -109.0100       7.7        43       107        60
OIR    2025250     91400   21.4900 -109.0200       7.7        43       107        60
OIR    2025250     91400   21.4900 -109.0300       7.7        43       108        60
OIR    2025250     91400   21.4900 -109.0400       7.7        43       108        60
OIR    2025250     91400   21.4900 -109.0500       7.7        43       108        60
OIR    2025250     91400   21.4900 -109.0600       7.7        43       107        60
OIR    2025250     91400   21.4900 -109.0700       7.7        43       105        60
OIR    2025250     91400   21.4900 -109.0800       7.7        43       104        60
OIR    2025250     91400   21.4900 -109.0900       7.7        43       104        60
OIR    2025250     91400   21.4900 -109.1000       7.7        43       104        60
OIR    2025250     91400   21.4900 -109.1100       7.7        43       105        60
OIR    2025250     91400   21.4900 -109.1200       7.6        43       105        60
OIR    2025250     91400   21.4900 -109.1300       7.6        43       105        60
OIR    2025250     91400   21.4900 -109.1400       7.6        43       105        60
OIR    2025250     91400   21.4900 -109.1500       7.6        43       104        60
OIR    2025250     91400   21.4900 -109.1600       7.6        43       104        60
OIR    2025250     91400   21.4900 -109.1700       7.6        43       104        60
OIR    2025250     91400   21.4900 -109.1800       7.6        43       103        60
OIR    2025250     91400   21.4900 -109.1900       7.6        43       103        60
OIR    2025250     91400   21.4900 -109.2000       7.5        44       103        60
OIR    2025250     91400   21.4900 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.4900 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.4900 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.4900 -109.2400       7.5        44       104        60
OIR    2025250     91400   21.4900 -109.2500       7.4        44       104        60
OIR    2025250     91400   21.4900 -109.2600       7.3        45       107        60
OIR    2025250     91400   21.4900 -109.2700       7.2        45       110        60
OIR    2025250     91400   21.4900 -109.2800       7.1        46       112        60
OIR    2025250     91400   21.4900 -109.2900       7.0        46       111        60
OIR    2025250     91400   21.4900 -109.3000       6.9        47       110        60
OIR    2025250     91400   21.4900 -109.3100       6.8        47       110        60
OIR    2025250     91400   21.4900 -109.3200       6.6        47       111        60
OIR    2025250     91400   21.4900 -109.3300       6.6        47       112        60
OIR    2025250     91400   21.4900 -109.3400       6.5        47       111        60
OIR    2025250     91400   21.4900 -109.3500       6.5        47       111        60
OIR    2025250     91400   21.4900 -109.3600       6.5        47       112        60
OIR    2025250     91400   21.4900 -109.3700       6.5        47       113        60
OIR    2025250     91400   21.4900 -109.3800       6.4        47       113        60
OIR    2025250     91400   21.4900 -109.3900       6.4        47       110        60
OIR    2025250     91400   21.4900 -109.4000       6.4        47       108        60
OIR    2025250     91400   21.4900 -109.4100       6.4        47       108        60
OIR    2025250     91400   21.4900 -109.4200       6.3        46       108        60
OIR    2025250     91400   21.4900 -109.4300       6.3        46       108        60
OIR    2025250     91400   21.4900 -109.4400       6.3        46       107        60
OIR    2025250     91400   21.4900 -109.4500       6.3        45       107        60
OIR    2025250     91400   21.4900 -109.4600       6.3        45       108        60
OIR    2025250     91400   21.4900 -109.4700       6.2        45       109        60
OIR    2025250     91400   21.4900 -109.4800       6.1        44       111        60
OIR    2025250     91400   21.4900 -109.4900       5.9        44       111        60
OIR    2025250     91400   21.4900 -109.5000       5.5        44       111        60
OIR    2025250     91400   21.4900 -109.5100       4.4        48       111        60
OIR    2025250     91400   21.4900 -115.2400      13.1       154       154        60
OIR    2025250     91400   21.4900 -115.2500      13.8       147       127        60
OIR    2025250     91400   21.4900 -115.2600      14.8       141       127        60
OIR    2025250     91400   21.4900 -115.2700      15.8       137       127        60
OIR    2025250     91400   21.4800 -108.6100       7.0        51       119        60
OIR    2025250     91400   21.4800 -108.6200       7.1        50       119        60
OIR    2025250     91400   21.4800 -108.6300       7.2        49       120        60
OIR    2025250     91400   21.4800 -108.6400       7.3        49       121        60
OIR    2025250     91400   21.4800 -108.6500       7.3        48       122        60
OIR    2025250     91400   21.4800 -108.6600       7.3        49       122        60
OIR    2025250     91400   21.4800 -108.6700       7.2        50       121        60
OIR    2025250     91400   21.4800 -108.6800       7.2        50       120        60
OIR    2025250     91400   21.4800 -108.6900       7.3        51       119        60
OIR    2025250     91400   21.4800 -108.7000       7.3        51       119        60
OIR    2025250     91400   21.4800 -108.7100       7.3        50       119        60
OIR    2025250     91400   21.4800 -108.7200       7.3        50       120        60
OIR    2025250     91400   21.4800 -108.7300       7.3        50       120        60
OIR    2025250     91400   21.4800 -108.7400       7.3        50       120        60
OIR    2025250     91400   21.4800 -108.7500       7.4        50       119        60
OIR    2025250     91400   21.4800 -108.7600       7.4        50       117        60
OIR    2025250     91400   21.4800 -108.7700       7.4        49       113        60
OIR    2025250     91400   21.4800 -108.7800       7.5        48       109        60
OIR    2025250     91400   21.4800 -108.7900       7.5        47       109        60
OIR    2025250     91400   21.4800 -108.8000       7.5        47       108        60
OIR    2025250     91400   21.4800 -108.8100       7.5        46       108        60
OIR    2025250     91400   21.4800 -108.8200       7.5        46       107        60
OIR    2025250     91400   21.4800 -108.8300       7.5        45       105        60
OIR    2025250     91400   21.4800 -108.8400       7.5        45       104        60
OIR    2025250     91400   21.4800 -108.8500       7.5        45       104        60
OIR    2025250     91400   21.4800 -108.8600       7.6        44       104        60
OIR    2025250     91400   21.4800 -108.8700       7.6        44       105        60
OIR    2025250     91400   21.4800 -108.8800       7.6        44       107        60
OIR    2025250     91400   21.4800 -108.8900       7.6        44       108        60
OIR    2025250     91400   21.4800 -108.9000       7.7        44       108        60
OIR    2025250     91400   21.4800 -108.9100       7.7        44       108        60
OIR    2025250     91400   21.4800 -108.9200       7.7        44       108        60
OIR    2025250     91400   21.4800 -108.9300       7.7        43       108        60
OIR    2025250     91400   21.4800 -108.9400       7.7        43       108        60
OIR    2025250     91400   21.4800 -108.9500       7.7        43       108        60
OIR    2025250     91400   21.4800 -108.9600       7.7        43       107        60
OIR    2025250     91400   21.4800 -108.9700       7.7        43       105        60
OIR    2025250     91400   21.4800 -108.9800       7.7        43       105        60
OIR    2025250     91400   21.4800 -108.9900       7.7        43       105        60
OIR    2025250     91400   21.4800 -109.0000       7.7        43       107        60
OIR    2025250     91400   21.4800 -109.0100       7.7        43       107        60
OIR    2025250     91400   21.4800 -109.0200       7.7        43       108        60
OIR    2025250     91400   21.4800 -109.0300       7.7        43       108        60
OIR    2025250     91400   21.4800 -109.0400       7.7        43       108        60
OIR    2025250     91400   21.4800 -109.0500       7.7        43       107        60
OIR    2025250     91400   21.4800 -109.0600       7.7        43       105        60
OIR    2025250     91400   21.4800 -109.0700       7.7        43       105        60
OIR    2025250     91400   21.4800 -109.0800       7.7        43       104        60
OIR    2025250     91400   21.4800 -109.0900       7.7        43       104        60
OIR    2025250     91400   21.4800 -109.1000       7.7        43       104        60
OIR    2025250     91400   21.4800 -109.1100       7.7        43       104        60
OIR    2025250     91400   21.4800 -109.1200       7.7        43       104        60
OIR    2025250     91400   21.4800 -109.1300       7.6        43       104        60
OIR    2025250     91400   21.4800 -109.1400       7.6        43       104        60
OIR    2025250     91400   21.4800 -109.1500       7.6        43       104        60
OIR    2025250     91400   21.4800 -109.1600       7.6        43       104        60
OIR    2025250     91400   21.4800 -109.1700       7.6        43       104        60
OIR    2025250     91400   21.4800 -109.1800       7.6        43       103        60
OIR    2025250     91400   21.4800 -109.1900       7.6        43       103        60
OIR    2025250     91400   21.4800 -109.2000       7.5        44       103        60
OIR    2025250     91400   21.4800 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.4800 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.4800 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.4800 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.4800 -109.2500       7.4        44       104        60
OIR    2025250     91400   21.4800 -109.2600       7.3        45       104        60
OIR    2025250     91400   21.4800 -109.2700       7.2        46       108        60
OIR    2025250     91400   21.4800 -109.2800       7.1        46       111        60
OIR    2025250     91400   21.4800 -109.2900       7.0        46       110        60
OIR    2025250     91400   21.4800 -109.3000       6.9        47       109        60
OIR    2025250     91400   21.4800 -109.3100       6.8        47       108        60
OIR    2025250     91400   21.4800 -109.3200       6.6        47       109        60
OIR    2025250     91400   21.4800 -109.3300       6.6        47       110        60
OIR    2025250     91400   21.4800 -109.3400       6.5        47       109        60
OIR    2025250     91400   21.4800 -109.3500       6.5        47       109        60
OIR    2025250     91400   21.4800 -109.3600       6.5        47       109        60
OIR    2025250     91400   21.4800 -109.3700       6.5        47       111        60
OIR    2025250     91400   21.4800 -109.3800       6.4        47       112        60
OIR    2025250     91400   21.4800 -109.3900       6.4        47       110        60
OIR    2025250     91400   21.4800 -109.4000       6.4        47       108        60
OIR    2025250     91400   21.4800 -109.4100       6.3        47       107        60
OIR    2025250     91400   21.4800 -109.4200       6.3        46       107        60
OIR    2025250     91400   21.4800 -109.4300       6.3        46       107        60
OIR    2025250     91400   21.4800 -109.4400       6.3        46       105        60
OIR    2025250     91400   21.4800 -109.4500       6.3        45       105        60
OIR    2025250     91400   21.4800 -109.4600       6.2        45       105        60
OIR    2025250     91400   21.4800 -109.4700       6.1        45       107        60
OIR    2025250     91400   21.4800 -109.4800       5.9        44       109        60
OIR    2025250     91400   21.4800 -109.4900       5.6        44       109        60
OIR    2025250     91400   21.4800 -109.5000       5.0        46       109        60
OIR    2025250     91400   21.4800 -109.5100       4.1        50       109        60
OIR    2025250     91400   21.4800 -115.2500      13.6       152       134        60
OIR    2025250     91400   21.4800 -115.2600      14.6       146       125        60
OIR    2025250     91400   21.4800 -115.2700      15.7       141       125        60
OIR    2025250     91400   21.4800 -115.2800      16.6       138       147        60
OIR    2025250     91400   21.4700 -108.6100       6.3        58       115        60
OIR    2025250     91400   21.4700 -108.6200       6.5        55       116        60
OIR    2025250     91400   21.4700 -108.6300       6.5        54       117        60
OIR    2025250     91400   21.4700 -108.6400       6.9        51       121        60
OIR    2025250     91400   21.4700 -108.6500       7.2        50       125        60
OIR    2025250     91400   21.4700 -108.6600       7.1        51       128        60
OIR    2025250     91400   21.4700 -108.6700       7.1        52       127        60
OIR    2025250     91400   21.4700 -108.6800       7.1        53       126        60
OIR    2025250     91400   21.4700 -108.6900       7.1        53       125        60
OIR    2025250     91400   21.4700 -108.7000       7.1        53       124        60
OIR    2025250     91400   21.4700 -108.7100       7.1        53       123        60
OIR    2025250     91400   21.4700 -108.7200       7.2        52       124        60
OIR    2025250     91400   21.4700 -108.7300       7.2        51       125        60
OIR    2025250     91400   21.4700 -108.7400       7.3        51       125        60
OIR    2025250     91400   21.4700 -108.7500       7.3        51       125        60
OIR    2025250     91400   21.4700 -108.7600       7.3        50       124        60
OIR    2025250     91400   21.4700 -108.7700       7.4        49       116        60
OIR    2025250     91400   21.4700 -108.7800       7.4        48       110        60
OIR    2025250     91400   21.4700 -108.7900       7.4        48       107        60
OIR    2025250     91400   21.4700 -108.8000       7.4        47       105        60
OIR    2025250     91400   21.4700 -108.8100       7.4        47       104        60
OIR    2025250     91400   21.4700 -108.8200       7.4        46       104        60
OIR    2025250     91400   21.4700 -108.8300       7.4        46       104        60
OIR    2025250     91400   21.4700 -108.8400       7.4        46       104        60
OIR    2025250     91400   21.4700 -108.8500       7.4        45       104        60
OIR    2025250     91400   21.4700 -108.8600       7.5        45       104        60
OIR    2025250     91400   21.4700 -108.8700       7.5        45       104        60
OIR    2025250     91400   21.4700 -108.8800       7.6        44       104        60
OIR    2025250     91400   21.4700 -108.8900       7.6        44       105        60
OIR    2025250     91400   21.4700 -108.9000       7.6        44       107        60
OIR    2025250     91400   21.4700 -108.9100       7.6        44       107        60
OIR    2025250     91400   21.4700 -108.9200       7.6        44       107        60
OIR    2025250     91400   21.4700 -108.9300       7.6        44       105        60
OIR    2025250     91400   21.4700 -108.9400       7.7        43       105        60
OIR    2025250     91400   21.4700 -108.9500       7.7        43       105        60
OIR    2025250     91400   21.4700 -108.9600       7.7        43       105        60
OIR    2025250     91400   21.4700 -108.9700       7.7        43       104        60
OIR    2025250     91400   21.4700 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.4700 -108.9900       7.7        43       104        60
OIR    2025250     91400   21.4700 -109.0000       7.7        43       105        60
OIR    2025250     91400   21.4700 -109.0100       7.7        43       107        60
OIR    2025250     91400   21.4700 -109.0200       7.7        43       107        60
OIR    2025250     91400   21.4700 -109.0300       7.7        43       107        60
OIR    2025250     91400   21.4700 -109.0400       7.7        43       107        60
OIR    2025250     91400   21.4700 -109.0500       7.7        43       105        60
OIR    2025250     91400   21.4700 -109.0600       7.7        43       104        60
OIR    2025250     91400   21.4700 -109.0700       7.7        43       104        60
OIR    2025250     91400   21.4700 -109.0800       7.7        43       104        60
OIR    2025250     91400   21.4700 -109.0900       7.7        43       104        60
OIR    2025250     91400   21.4700 -109.1000       7.7        43       104        60
OIR    2025250     91400   21.4700 -109.1100       7.7        43       104        60
OIR    2025250     91400   21.4700 -109.1200       7.7        43       104        60
OIR    2025250     91400   21.4700 -109.1300       7.7        43       104        60
OIR    2025250     91400   21.4700 -109.1400       7.6        43       104        60
OIR    2025250     91400   21.4700 -109.1500       7.6        43       104        60
OIR    2025250     91400   21.4700 -109.1600       7.6        43       104        60
OIR    2025250     91400   21.4700 -109.1700       7.6        43       104        60
OIR    2025250     91400   21.4700 -109.1800       7.6        43       103        60
OIR    2025250     91400   21.4700 -109.1900       7.6        44       103        60
OIR    2025250     91400   21.4700 -109.2000       7.5        44       103        60
OIR    2025250     91400   21.4700 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.4700 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.4700 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.4700 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.4700 -109.2500       7.4        45       103        60
OIR    2025250     91400   21.4700 -109.2600       7.3        45       103        60
OIR    2025250     91400   21.4700 -109.2700       7.2        46       104        60
OIR    2025250     91400   21.4700 -109.2800       7.1        46       108        60
OIR    2025250     91400   21.4700 -109.2900       7.0        46       108        60
OIR    2025250     91400   21.4700 -109.3000       6.9        46       107        60
OIR    2025250     91400   21.4700 -109.3100       6.8        47       105        60
OIR    2025250     91400   21.4700 -109.3200       6.7        47       107        60
OIR    2025250     91400   21.4700 -109.3300       6.6        47       108        60
OIR    2025250     91400   21.4700 -109.3400       6.5        47       108        60
OIR    2025250     91400   21.4700 -109.3500       6.5        47       105        60
OIR    2025250     91400   21.4700 -109.3600       6.5        47       104        60
OIR    2025250     91400   21.4700 -109.3700       6.4        47       107        60
OIR    2025250     91400   21.4700 -109.3800       6.4        47       109        60
OIR    2025250     91400   21.4700 -109.3900       6.4        47       108        60
OIR    2025250     91400   21.4700 -109.4000       6.4        47       107        60
OIR    2025250     91400   21.4700 -109.4100       6.3        47       105        60
OIR    2025250     91400   21.4700 -109.4200       6.3        47       105        60
OIR    2025250     91400   21.4700 -109.4300       6.3        46       105        60
OIR    2025250     91400   21.4700 -109.4400       6.2        46       104        60
OIR    2025250     91400   21.4700 -109.4500       6.2        46       104        60
OIR    2025250     91400   21.4700 -109.4600       6.1        45       104        60
OIR    2025250     91400   21.4700 -109.4700       5.9        45       104        60
OIR    2025250     91400   21.4700 -109.4800       5.6        45       105        60
OIR    2025250     91400   21.4700 -109.4900       5.2        46       105        60
OIR    2025250     91400   21.4700 -109.5000       4.7        48       105        60
OIR    2025250     91400   21.4700 -109.5100       4.0        50       107        60
OIR    2025250     91400   21.4600 -108.6100       5.8        63       126        60
OIR    2025250     91400   21.4600 -108.6200       5.8        63       126        60
OIR    2025250     91400   21.4600 -108.6300       5.9        62       126        60
OIR    2025250     91400   21.4600 -108.6400       6.1        59       126        60
OIR    2025250     91400   21.4600 -108.6500       6.7        55       129        60
OIR    2025250     91400   21.4600 -108.6600       6.9        54       132        60
OIR    2025250     91400   21.4600 -108.6700       7.0        54       132        60
OIR    2025250     91400   21.4600 -108.6800       7.1        54       132        60
OIR    2025250     91400   21.4600 -108.6900       7.1        54       131        60
OIR    2025250     91400   21.4600 -108.7000       7.1        53       130        60
OIR    2025250     91400   21.4600 -108.7100       7.1        53       129        60
OIR    2025250     91400   21.4600 -108.7200       7.1        53       128        60
OIR    2025250     91400   21.4600 -108.7300       7.1        52       128        60
OIR    2025250     91400   21.4600 -108.7400       7.2        52       127        60
OIR    2025250     91400   21.4600 -108.7500       7.2        51       127        60
OIR    2025250     91400   21.4600 -108.7600       7.3        50       126        60
OIR    2025250     91400   21.4600 -108.7700       7.3        50       121        60
OIR    2025250     91400   21.4600 -108.7800       7.3        49       113        60
OIR    2025250     91400   21.4600 -108.7900       7.3        48       107        60
OIR    2025250     91400   21.4600 -108.8000       7.3        47       105        60
OIR    2025250     91400   21.4600 -108.8100       7.3        47       104        60
OIR    2025250     91400   21.4600 -108.8200       7.3        46       104        60
OIR    2025250     91400   21.4600 -108.8300       7.3        46       105        60
OIR    2025250     91400   21.4600 -108.8400       7.2        46       105        60
OIR    2025250     91400   21.4600 -108.8500       7.3        46       104        60
OIR    2025250     91400   21.4600 -108.8600       7.3        46       104        60
OIR    2025250     91400   21.4600 -108.8700       7.3        45       104        60
OIR    2025250     91400   21.4600 -108.8800       7.4        45       104        60
OIR    2025250     91400   21.4600 -108.8900       7.5        45       104        60
OIR    2025250     91400   21.4600 -108.9000       7.5        44       104        60
OIR    2025250     91400   21.4600 -108.9100       7.6        44       107        60
OIR    2025250     91400   21.4600 -108.9200       7.6        44       105        60
OIR    2025250     91400   21.4600 -108.9300       7.6        44       104        60
OIR    2025250     91400   21.4600 -108.9400       7.6        43       104        60
OIR    2025250     91400   21.4600 -108.9500       7.6        43       104        60
OIR    2025250     91400   21.4600 -108.9600       7.7        43       104        60
OIR    2025250     91400   21.4600 -108.9700       7.7        43       104        60
OIR    2025250     91400   21.4600 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.4600 -108.9900       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.0000       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.0100       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.0200       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.0300       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.0400       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.0500       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.0600       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.0700       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.0800       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.0900       7.7        43       103        60
OIR    2025250     91400   21.4600 -109.1000       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.1100       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.1200       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.1300       7.7        43       104        60
OIR    2025250     91400   21.4600 -109.1400       7.6        43       103        60
OIR    2025250     91400   21.4600 -109.1500       7.6        43       103        60
OIR    2025250     91400   21.4600 -109.1600       7.6        43       103        60
OIR    2025250     91400   21.4600 -109.1700       7.6        43       103        60
OIR    2025250     91400   21.4600 -109.1800       7.6        44       103        60
OIR    2025250     91400   21.4600 -109.1900       7.6        44       103        60
OIR    2025250     91400   21.4600 -109.2000       7.5        44       103        60
OIR    2025250     91400   21.4600 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.4600 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.4600 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.4600 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.4600 -109.2500       7.4        45       103        60
OIR    2025250     91400   21.4600 -109.2600       7.3        45       103        60
OIR    2025250     91400   21.4600 -109.2700       7.2        45       104        60
OIR    2025250     91400   21.4600 -109.2800       7.1        46       104        60
OIR    2025250     91400   21.4600 -109.2900       7.0        46       105        60
OIR    2025250     91400   21.4600 -109.3000       6.9        46       104        60
OIR    2025250     91400   21.4600 -109.3100       6.8        47       104        60
OIR    2025250     91400   21.4600 -109.3200       6.7        47       104        60
OIR    2025250     91400   21.4600 -109.3300       6.6        47       105        60
OIR    2025250     91400   21.4600 -109.3400       6.5        47       105        60
OIR    2025250     91400   21.4600 -109.3500       6.5        47       104        60
OIR    2025250     91400   21.4600 -109.3600       6.4        47       103        60
OIR    2025250     91400   21.4600 -109.3700       6.4        47       104        60
OIR    2025250     91400   21.4600 -109.3800       6.4        47       104        60
OIR    2025250     91400   21.4600 -109.3900       6.4        47       105        60
OIR    2025250     91400   21.4600 -109.4000       6.3        47       105        60
OIR    2025250     91400   21.4600 -109.4100       6.3        47       104        60
OIR    2025250     91400   21.4600 -109.4200       6.2        47       104        60
OIR    2025250     91400   21.4600 -109.4300       6.2        46       104        60
OIR    2025250     91400   21.4600 -109.4400       6.1        46       104        60
OIR    2025250     91400   21.4600 -109.4500       6.0        46       103        60
OIR    2025250     91400   21.4600 -109.4600       5.9        46       103        60
OIR    2025250     91400   21.4600 -109.4700       5.6        46       103        60
OIR    2025250     91400   21.4600 -109.4800       5.2        46       103        60
OIR    2025250     91400   21.4600 -109.4900       4.9        47       103        60
OIR    2025250     91400   21.4600 -109.5000       4.5        48       104        60
OIR    2025250     91400   21.4600 -109.5100       4.0        50       104        60
OIR    2025250     91400   21.4500 -108.6100       5.8        63       136        60
OIR    2025250     91400   21.4500 -108.6200       5.8        63       135        60
OIR    2025250     91400   21.4500 -108.6300       5.8        63       134        60
OIR    2025250     91400   21.4500 -108.6400       5.9        64       133        60
OIR    2025250     91400   21.4500 -108.6500       6.1        62       134        60
OIR    2025250     91400   21.4500 -108.6600       6.5        59       136        60
OIR    2025250     91400   21.4500 -108.6700       6.8        56       137        60
OIR    2025250     91400   21.4500 -108.6800       7.0        55       138        60
OIR    2025250     91400   21.4500 -108.6900       7.0        54       139        60
OIR    2025250     91400   21.4500 -108.7000       7.1        54       137        60
OIR    2025250     91400   21.4500 -108.7100       7.1        54       134        60
OIR    2025250     91400   21.4500 -108.7200       7.1        54       132        60
OIR    2025250     91400   21.4500 -108.7300       7.1        53       130        60
OIR    2025250     91400   21.4500 -108.7400       7.1        52       128        60
OIR    2025250     91400   21.4500 -108.7500       7.1        52       127        60
OIR    2025250     91400   21.4500 -108.7600       7.2        51       125        60
OIR    2025250     91400   21.4500 -108.7700       7.2        50       122        60
OIR    2025250     91400   21.4500 -108.7800       7.2        49       116        60
OIR    2025250     91400   21.4500 -108.7900       7.2        48       111        60
OIR    2025250     91400   21.4500 -108.8000       7.2        47       110        60
OIR    2025250     91400   21.4500 -108.8100       7.2        47       109        60
OIR    2025250     91400   21.4500 -108.8200       7.2        47       108        60
OIR    2025250     91400   21.4500 -108.8300       7.2        47       108        60
OIR    2025250     91400   21.4500 -108.8400       7.1        46       108        60
OIR    2025250     91400   21.4500 -108.8500       7.1        46       108        60
OIR    2025250     91400   21.4500 -108.8600       7.1        46       107        60
OIR    2025250     91400   21.4500 -108.8700       7.1        46       105        60
OIR    2025250     91400   21.4500 -108.8800       7.1        46       105        60
OIR    2025250     91400   21.4500 -108.8900       7.2        46       105        60
OIR    2025250     91400   21.4500 -108.9000       7.2        46       105        60
OIR    2025250     91400   21.4500 -108.9100       7.3        45       105        60
OIR    2025250     91400   21.4500 -108.9200       7.4        45       105        60
OIR    2025250     91400   21.4500 -108.9300       7.5        44       104        60
OIR    2025250     91400   21.4500 -108.9400       7.5        44       104        60
OIR    2025250     91400   21.4500 -108.9500       7.6        44       104        60
OIR    2025250     91400   21.4500 -108.9600       7.6        43       104        60
OIR    2025250     91400   21.4500 -108.9700       7.7        43       104        60
OIR    2025250     91400   21.4500 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.4500 -108.9900       7.7        43       104        60
OIR    2025250     91400   21.4500 -109.0000       7.7        43       104        60
OIR    2025250     91400   21.4500 -109.0100       7.7        43       104        60
OIR    2025250     91400   21.4500 -109.0200       7.7        43       104        60
OIR    2025250     91400   21.4500 -109.0300       7.7        43       104        60
OIR    2025250     91400   21.4500 -109.0400       7.7        43       103        60
OIR    2025250     91400   21.4500 -109.0500       7.7        43       104        60
OIR    2025250     91400   21.4500 -109.0600       7.7        43       104        60
OIR    2025250     91400   21.4500 -109.0700       7.7        43       104        60
OIR    2025250     91400   21.4500 -109.0800       7.7        43       104        60
OIR    2025250     91400   21.4500 -109.0900       7.7        43       104        60
OIR    2025250     91400   21.4500 -109.1000       7.7        43       103        60
OIR    2025250     91400   21.4500 -109.1100       7.7        43       103        60
OIR    2025250     91400   21.4500 -109.1200       7.7        43       103        60
OIR    2025250     91400   21.4500 -109.1300       7.7        43       103        60
OIR    2025250     91400   21.4500 -109.1400       7.7        43       103        60
OIR    2025250     91400   21.4500 -109.1500       7.6        43       103        60
OIR    2025250     91400   21.4500 -109.1600       7.6        43       103        60
OIR    2025250     91400   21.4500 -109.1700       7.6        43       103        60
OIR    2025250     91400   21.4500 -109.1800       7.6        44       103        60
OIR    2025250     91400   21.4500 -109.1900       7.6        44       103        60
OIR    2025250     91400   21.4500 -109.2000       7.5        44       103        60
OIR    2025250     91400   21.4500 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.4500 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.4500 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.4500 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.4500 -109.2500       7.3        45       103        60
OIR    2025250     91400   21.4500 -109.2600       7.3        45       103        60
OIR    2025250     91400   21.4500 -109.2700       7.2        45       103        60
OIR    2025250     91400   21.4500 -109.2800       7.1        45       104        60
OIR    2025250     91400   21.4500 -109.2900       7.1        46       104        60
OIR    2025250     91400   21.4500 -109.3000       7.0        46       104        60
OIR    2025250     91400   21.4500 -109.3100       6.8        46       103        60
OIR    2025250     91400   21.4500 -109.3200       6.7        47       104        60
OIR    2025250     91400   21.4500 -109.3300       6.6        47       104        60
OIR    2025250     91400   21.4500 -109.3400       6.5        47       104        60
OIR    2025250     91400   21.4500 -109.3500       6.5        47       104        60
OIR    2025250     91400   21.4500 -109.3600       6.4        47       103        60
OIR    2025250     91400   21.4500 -109.3700       6.4        47       103        60
OIR    2025250     91400   21.4500 -109.3800       6.4        47       104        60
OIR    2025250     91400   21.4500 -109.3900       6.3        47       104        60
OIR    2025250     91400   21.4500 -109.4000       6.3        47       104        60
OIR    2025250     91400   21.4500 -109.4100       6.3        47       104        60
OIR    2025250     91400   21.4500 -109.4200       6.2        47       104        60
OIR    2025250     91400   21.4500 -109.4300       6.1        47       104        60
OIR    2025250     91400   21.4500 -109.4400       6.0        47       104        60
OIR    2025250     91400   21.4500 -109.4500       5.8        47       103        60
OIR    2025250     91400   21.4500 -109.4600       5.6        47       103        60
OIR    2025250     91400   21.4500 -109.4700       5.2        47       103        60
OIR    2025250     91400   21.4500 -109.4800       4.9        48       103        60
OIR    2025250     91400   21.4500 -109.4900       4.6        48       103        60
OIR    2025250     91400   21.4500 -109.5000       4.3        49       103        60
OIR    2025250     91400   21.4500 -109.5100       4.1        50       103        60
OIR    2025250     91400   21.4400 -108.7100       7.0        56       138        60
OIR    2025250     91400   21.4400 -108.7200       7.0        55       136        60
OIR    2025250     91400   21.4400 -108.7300       7.0        54       134        60
OIR    2025250     91400   21.4400 -108.7400       7.0        53       131        60
OIR    2025250     91400   21.4400 -108.7500       7.0        52       129        60
OIR    2025250     91400   21.4400 -108.7600       7.1        51       127        60
OIR    2025250     91400   21.4400 -108.7700       7.1        50       125        60
OIR    2025250     91400   21.4400 -108.7800       7.1        48       120        60
OIR    2025250     91400   21.4400 -108.7900       7.1        47       115        60
OIR    2025250     91400   21.4400 -108.8000       7.1        47       113        60
OIR    2025250     91400   21.4400 -108.8100       7.1        47       111        60
OIR    2025250     91400   21.4400 -108.8200       7.1        47       110        60
OIR    2025250     91400   21.4400 -108.8300       7.1        47       110        60
OIR    2025250     91400   21.4400 -108.8400       7.1        47       110        60
OIR    2025250     91400   21.4400 -108.8500       7.1        47       110        60
OIR    2025250     91400   21.4400 -108.8600       7.0        47       109        60
OIR    2025250     91400   21.4400 -108.8700       7.0        47       109        60
OIR    2025250     91400   21.4400 -108.8800       7.0        47       109        60
OIR    2025250     91400   21.4400 -108.8900       7.0        47       108        60
OIR    2025250     91400   21.4400 -108.9000       7.1        47       107        60
OIR    2025250     91400   21.4400 -108.9100       7.1        47       105        60
OIR    2025250     91400   21.4400 -108.9200       7.1        46       105        60
OIR    2025250     91400   21.4400 -108.9300       7.2        46       104        60
OIR    2025250     91400   21.4400 -108.9400       7.2        46       104        60
OIR    2025250     91400   21.4400 -108.9500       7.4        45       104        60
OIR    2025250     91400   21.4400 -108.9600       7.6        44       104        60
OIR    2025250     91400   21.4400 -108.9700       7.7        43       103        60
OIR    2025250     91400   21.4400 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.4400 -108.9900       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.0000       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.0100       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.0200       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.0300       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.0400       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.0500       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.0600       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.0700       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.0800       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.0900       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.1000       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.1100       7.7        43       104        60
OIR    2025250     91400   21.4400 -109.1200       7.7        43       103        60
OIR    2025250     91400   21.4400 -109.1300       7.7        43       103        60
OIR    2025250     91400   21.4400 -109.1400       7.7        43       103        60
OIR    2025250     91400   21.4400 -109.1500       7.6        43       103        60
OIR    2025250     91400   21.4400 -109.1600       7.6        43       103        60
OIR    2025250     91400   21.4400 -109.1700       7.6        43       103        60
OIR    2025250     91400   21.4400 -109.1800       7.6        44       103        60
OIR    2025250     91400   21.4400 -109.1900       7.6        44       103        60
OIR    2025250     91400   21.4400 -109.2000       7.5        44       103        60
OIR    2025250     91400   21.4400 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.4400 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.4400 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.4400 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.4400 -109.2500       7.3        45       103        60
OIR    2025250     91400   21.4400 -109.2600       7.3        45       103        60
OIR    2025250     91400   21.4400 -109.2700       7.2        45       103        60
OIR    2025250     91400   21.4400 -109.2800       7.1        45       103        60
OIR    2025250     91400   21.4400 -109.2900       7.1        45       103        60
OIR    2025250     91400   21.4400 -109.3000       7.0        46       103        60
OIR    2025250     91400   21.4400 -109.3100       6.9        46       103        60
OIR    2025250     91400   21.4400 -109.3200       6.8        46       103        60
OIR    2025250     91400   21.4400 -109.3300       6.7        46       103        60
OIR    2025250     91400   21.4400 -109.3400       6.6        47       103        60
OIR    2025250     91400   21.4400 -109.3500       6.5        47       103        60
OIR    2025250     91400   21.4400 -109.3600       6.4        47       103        60
OIR    2025250     91400   21.4400 -109.3700       6.4        47       103        60
OIR    2025250     91400   21.4400 -109.3800       6.3        47       103        60
OIR    2025250     91400   21.4400 -109.3900       6.3        47       103        60
OIR    2025250     91400   21.4400 -109.4000       6.3        47       103        60
OIR    2025250     91400   21.4400 -109.4100       6.2        47       104        60
OIR    2025250     91400   21.4400 -109.4200       6.1        47       104        60
OIR    2025250     91400   21.4400 -109.4300       5.9        47       103        60
OIR    2025250     91400   21.4400 -109.4400       5.7        47       103        60
OIR    2025250     91400   21.4400 -109.4500       5.5        47       103        60
OIR    2025250     91400   21.4400 -109.4600       5.3        47       103        60
OIR    2025250     91400   21.4400 -109.4700       5.1        47       103        60
OIR    2025250     91400   21.4400 -109.4800       4.8        47       103        60
OIR    2025250     91400   21.4400 -109.4900       4.6        48       103        60
OIR    2025250     91400   21.4400 -109.5000       4.3        48       103        60
OIR    2025250     91400   21.4400 -109.5100       4.1        50       103        60
OIR    2025250     91400   21.4300 -108.7200       6.6        59       138        60
OIR    2025250     91400   21.4300 -108.7300       6.8        56       136        60
OIR    2025250     91400   21.4300 -108.7400       6.8        54       135        60
OIR    2025250     91400   21.4300 -108.7500       6.9        52       133        60
OIR    2025250     91400   21.4300 -108.7600       6.9        51       131        60
OIR    2025250     91400   21.4300 -108.7700       7.0        49       128        60
OIR    2025250     91400   21.4300 -108.7800       7.0        47       124        60
OIR    2025250     91400   21.4300 -108.7900       7.1        47       120        60
OIR    2025250     91400   21.4300 -108.8000       7.1        47       116        60
OIR    2025250     91400   21.4300 -108.8100       7.1        47       113        60
OIR    2025250     91400   21.4300 -108.8200       7.1        47       111        60
OIR    2025250     91400   21.4300 -108.8300       7.0        47       111        60
OIR    2025250     91400   21.4300 -108.8400       7.0        47       110        60
OIR    2025250     91400   21.4300 -108.8500       7.0        47       110        60
OIR    2025250     91400   21.4300 -108.8600       7.0        47       109        60
OIR    2025250     91400   21.4300 -108.8700       7.0        47       109        60
OIR    2025250     91400   21.4300 -108.8800       7.0        47       108        60
OIR    2025250     91400   21.4300 -108.8900       7.0        47       108        60
OIR    2025250     91400   21.4300 -108.9000       7.0        47       107        60
OIR    2025250     91400   21.4300 -108.9100       7.1        47       105        60
OIR    2025250     91400   21.4300 -108.9200       7.1        47       104        60
OIR    2025250     91400   21.4300 -108.9300       7.1        47       104        60
OIR    2025250     91400   21.4300 -108.9400       7.1        47       104        60
OIR    2025250     91400   21.4300 -108.9500       7.1        46       104        60
OIR    2025250     91400   21.4300 -108.9600       7.3        45       104        60
OIR    2025250     91400   21.4300 -108.9700       7.6        44       103        60
OIR    2025250     91400   21.4300 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.4300 -108.9900       7.7        43       104        60
OIR    2025250     91400   21.4300 -109.0000       7.7        43       104        60
OIR    2025250     91400   21.4300 -109.0100       7.7        43       104        60
OIR    2025250     91400   21.4300 -109.0200       7.8        43       104        60
OIR    2025250     91400   21.4300 -109.0300       7.8        43       104        60
OIR    2025250     91400   21.4300 -109.0400       7.8        43       104        60
OIR    2025250     91400   21.4300 -109.0500       7.8        43       104        60
OIR    2025250     91400   21.4300 -109.0600       7.8        43       104        60
OIR    2025250     91400   21.4300 -109.0700       7.8        43       104        60
OIR    2025250     91400   21.4300 -109.0800       7.7        43       104        60
OIR    2025250     91400   21.4300 -109.0900       7.7        43       104        60
OIR    2025250     91400   21.4300 -109.1000       7.7        43       104        60
OIR    2025250     91400   21.4300 -109.1100       7.7        43       104        60
OIR    2025250     91400   21.4300 -109.1200       7.7        43       103        60
OIR    2025250     91400   21.4300 -109.1300       7.7        43       103        60
OIR    2025250     91400   21.4300 -109.1400       7.7        43       103        60
OIR    2025250     91400   21.4300 -109.1500       7.6        43       103        60
OIR    2025250     91400   21.4300 -109.1600       7.6        43       103        60
OIR    2025250     91400   21.4300 -109.1700       7.6        43       103        60
OIR    2025250     91400   21.4300 -109.1800       7.6        44       103        60
OIR    2025250     91400   21.4300 -109.1900       7.6        44       103        60
OIR    2025250     91400   21.4300 -109.2000       7.5        44       103        60
OIR    2025250     91400   21.4300 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.4300 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.4300 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.4300 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.4300 -109.2500       7.3        45       103        60
OIR    2025250     91400   21.4300 -109.2600       7.3        45       103        60
OIR    2025250     91400   21.4300 -109.2700       7.2        45       103        60
OIR    2025250     91400   21.4300 -109.2800       7.2        45       103        60
OIR    2025250     91400   21.4300 -109.2900       7.1        45       103        60
OIR    2025250     91400   21.4300 -109.3000       7.0        45       103        60
OIR    2025250     91400   21.4300 -109.3100       7.0        45       103        60
OIR    2025250     91400   21.4300 -109.3200       6.9        46       103        60
OIR    2025250     91400   21.4300 -109.3300       6.7        46       103        60
OIR    2025250     91400   21.4300 -109.3400       6.6        46       103        60
OIR    2025250     91400   21.4300 -109.3500       6.5        47       103        60
OIR    2025250     91400   21.4300 -109.3600       6.4        47       103        60
OIR    2025250     91400   21.4300 -109.3700       6.4        47       103        60
OIR    2025250     91400   21.4300 -109.3800       6.3        47       103        60
OIR    2025250     91400   21.4300 -109.3900       6.3        47       103        60
OIR    2025250     91400   21.4300 -109.4000       6.2        47       103        60
OIR    2025250     91400   21.4300 -109.4100       6.1        47       103        60
OIR    2025250     91400   21.4300 -109.4200       6.0        47       103        60
OIR    2025250     91400   21.4300 -109.4300       5.8        48       103        60
OIR    2025250     91400   21.4300 -109.4400       5.5        48       103        60
OIR    2025250     91400   21.4300 -109.4500       5.3        48       103        60
OIR    2025250     91400   21.4300 -109.4600       5.1        48       103        60
OIR    2025250     91400   21.4300 -109.4700       4.8        48       103        60
OIR    2025250     91400   21.4300 -109.4800       4.6        48       103        60
OIR    2025250     91400   21.4300 -109.4900       4.4        48       103        60
OIR    2025250     91400   21.4300 -109.5000       4.2        49       103        60
OIR    2025250     91400   21.4300 -109.5100       4.0        49       104        60
OIR    2025250     91400   21.4200 -108.7300       6.4        58       138        60
OIR    2025250     91400   21.4200 -108.7400       6.3        55       137        60
OIR    2025250     91400   21.4200 -108.7500       6.4        52       135        60
OIR    2025250     91400   21.4200 -108.7600       6.5        50       131        60
OIR    2025250     91400   21.4200 -108.7700       6.8        48       128        60
OIR    2025250     91400   21.4200 -108.7800       6.9        47       125        60
OIR    2025250     91400   21.4200 -108.7900       7.0        47       122        60
OIR    2025250     91400   21.4200 -108.8000       7.0        47       120        60
OIR    2025250     91400   21.4200 -108.8100       7.0        47       116        60
OIR    2025250     91400   21.4200 -108.8200       7.0        47       112        60
OIR    2025250     91400   21.4200 -108.8300       7.0        47       111        60
OIR    2025250     91400   21.4200 -108.8400       7.0        47       111        60
OIR    2025250     91400   21.4200 -108.8500       7.0        47       111        60
OIR    2025250     91400   21.4200 -108.8600       7.0        47       110        60
OIR    2025250     91400   21.4200 -108.8700       7.0        47       109        60
OIR    2025250     91400   21.4200 -108.8800       7.0        47       108        60
OIR    2025250     91400   21.4200 -108.8900       7.0        47       108        60
OIR    2025250     91400   21.4200 -108.9000       7.0        47       108        60
OIR    2025250     91400   21.4200 -108.9100       7.0        47       105        60
OIR    2025250     91400   21.4200 -108.9200       7.1        47       104        60
OIR    2025250     91400   21.4200 -108.9300       7.1        47       104        60
OIR    2025250     91400   21.4200 -108.9400       7.1        47       104        60
OIR    2025250     91400   21.4200 -108.9500       7.1        46       104        60
OIR    2025250     91400   21.4200 -108.9600       7.2        46       104        60
OIR    2025250     91400   21.4200 -108.9700       7.4        44       104        60
OIR    2025250     91400   21.4200 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.4200 -108.9900       7.7        43       103        60
OIR    2025250     91400   21.4200 -109.0000       7.8        43       103        60
OIR    2025250     91400   21.4200 -109.0100       7.8        43       103        60
OIR    2025250     91400   21.4200 -109.0200       7.8        43       103        60
OIR    2025250     91400   21.4200 -109.0300       7.8        43       103        60
OIR    2025250     91400   21.4200 -109.0400       7.8        43       103        60
OIR    2025250     91400   21.4200 -109.0500       7.8        43       103        60
OIR    2025250     91400   21.4200 -109.0600       7.8        43       103        60
OIR    2025250     91400   21.4200 -109.0700       7.8        43       104        60
OIR    2025250     91400   21.4200 -109.0800       7.8        43       104        60
OIR    2025250     91400   21.4200 -109.0900       7.8        43       104        60
OIR    2025250     91400   21.4200 -109.1000       7.7        43       104        60
OIR    2025250     91400   21.4200 -109.1100       7.7        43       104        60
OIR    2025250     91400   21.4200 -109.1200       7.7        43       103        60
OIR    2025250     91400   21.4200 -109.1300       7.7        43       103        60
OIR    2025250     91400   21.4200 -109.1400       7.7        43       103        60
OIR    2025250     91400   21.4200 -109.1500       7.7        43       103        60
OIR    2025250     91400   21.4200 -109.1600       7.6        43       103        60
OIR    2025250     91400   21.4200 -109.1700       7.6        43       103        60
OIR    2025250     91400   21.4200 -109.1800       7.6        44       103        60
OIR    2025250     91400   21.4200 -109.1900       7.6        44       103        60
OIR    2025250     91400   21.4200 -109.2000       7.5        44       103        60
OIR    2025250     91400   21.4200 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.4200 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.4200 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.4200 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.4200 -109.2500       7.3        44       103        60
OIR    2025250     91400   21.4200 -109.2600       7.3        45       103        60
OIR    2025250     91400   21.4200 -109.2700       7.2        45       103        60
OIR    2025250     91400   21.4200 -109.2800       7.2        45       103        60
OIR    2025250     91400   21.4200 -109.2900       7.1        45       103        60
OIR    2025250     91400   21.4200 -109.3000       7.1        45       103        60
OIR    2025250     91400   21.4200 -109.3100       7.0        45       103        60
OIR    2025250     91400   21.4200 -109.3200       6.9        45       103        60
OIR    2025250     91400   21.4200 -109.3300       6.8        45       103        60
OIR    2025250     91400   21.4200 -109.3400       6.7        46       103        60
OIR    2025250     91400   21.4200 -109.3500       6.6        46       103        60
OIR    2025250     91400   21.4200 -109.3600       6.4        46       103        60
OIR    2025250     91400   21.4200 -109.3700       6.4        46       103        60
OIR    2025250     91400   21.4200 -109.3800       6.3        47       103        60
OIR    2025250     91400   21.4200 -109.3900       6.2        47       103        60
OIR    2025250     91400   21.4200 -109.4000       6.1        47       103        60
OIR    2025250     91400   21.4200 -109.4100       6.0        47       103        60
OIR    2025250     91400   21.4200 -109.4200       5.9        47       103        60
OIR    2025250     91400   21.4200 -109.4300       5.6        48       103        60
OIR    2025250     91400   21.4200 -109.4400       5.3        48       103        60
OIR    2025250     91400   21.4200 -109.4500       5.1        48       104        60
OIR    2025250     91400   21.4200 -109.4600       4.9        48       103        60
OIR    2025250     91400   21.4200 -109.4700       4.7        48       103        60
OIR    2025250     91400   21.4200 -109.4800       4.5        48       103        60
OIR    2025250     91400   21.4200 -109.4900       4.3        49       103        60
OIR    2025250     91400   21.4200 -109.5000       4.2        49       104        60
OIR    2025250     91400   21.4200 -109.5100       4.0        49       104        60
OIR    2025250     91400   21.4100 -108.7300       5.9        58       138        60
OIR    2025250     91400   21.4100 -108.7400       5.9        54       136        60
OIR    2025250     91400   21.4100 -108.7500       6.0        52       134        60
OIR    2025250     91400   21.4100 -108.7600       6.2        49       129        60
OIR    2025250     91400   21.4100 -108.7700       6.5        48       123        60
OIR    2025250     91400   21.4100 -108.7800       6.8        47       120        60
OIR    2025250     91400   21.4100 -108.7900       6.9        46       120        60
OIR    2025250     91400   21.4100 -108.8000       7.0        46       121        60
OIR    2025250     91400   21.4100 -108.8100       7.0        46       117        60
OIR    2025250     91400   21.4100 -108.8200       7.0        47       113        60
OIR    2025250     91400   21.4100 -108.8300       7.0        47       110        60
OIR    2025250     91400   21.4100 -108.8400       7.0        47       110        60
OIR    2025250     91400   21.4100 -108.8500       7.0        47       110        60
OIR    2025250     91400   21.4100 -108.8600       7.0        47       109        60
OIR    2025250     91400   21.4100 -108.8700       7.0        47       109        60
OIR    2025250     91400   21.4100 -108.8800       7.0        47       108        60
OIR    2025250     91400   21.4100 -108.8900       7.0        47       108        60
OIR    2025250     91400   21.4100 -108.9000       7.0        47       108        60
OIR    2025250     91400   21.4100 -108.9100       7.0        47       107        60
OIR    2025250     91400   21.4100 -108.9200       7.0        47       104        60
OIR    2025250     91400   21.4100 -108.9300       7.1        47       103        60
OIR    2025250     91400   21.4100 -108.9400       7.1        47       104        60
OIR    2025250     91400   21.4100 -108.9500       7.1        46       104        60
OIR    2025250     91400   21.4100 -108.9600       7.2        46       104        60
OIR    2025250     91400   21.4100 -108.9700       7.4        45       104        60
OIR    2025250     91400   21.4100 -108.9800       7.7        43       104        60
OIR    2025250     91400   21.4100 -108.9900       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.0000       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.0100       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.0200       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.0300       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.0400       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.0500       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.0600       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.0700       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.0800       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.0900       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.1000       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.1100       7.8        43       103        60
OIR    2025250     91400   21.4100 -109.1200       7.7        43       103        60
OIR    2025250     91400   21.4100 -109.1300       7.7        43       103        60
OIR    2025250     91400   21.4100 -109.1400       7.7        43       103        60
OIR    2025250     91400   21.4100 -109.1500       7.7        43       103        60
OIR    2025250     91400   21.4100 -109.1600       7.6        43       103        60
OIR    2025250     91400   21.4100 -109.1700       7.6        43       103        60
OIR    2025250     91400   21.4100 -109.1800       7.6        44       103        60
OIR    2025250     91400   21.4100 -109.1900       7.6        44       103        60
OIR    2025250     91400   21.4100 -109.2000       7.5        44       103        60
OIR    2025250     91400   21.4100 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.4100 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.4100 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.4100 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.4100 -109.2500       7.3        44       103        60
OIR    2025250     91400   21.4100 -109.2600       7.3        45       103        60
OIR    2025250     91400   21.4100 -109.2700       7.2        45       103        60
OIR    2025250     91400   21.4100 -109.2800       7.2        45       103        60
OIR    2025250     91400   21.4100 -109.2900       7.1        45       103        60
OIR    2025250     91400   21.4100 -109.3000       7.1        45       103        60
OIR    2025250     91400   21.4100 -109.3100       7.0        45       103        60
OIR    2025250     91400   21.4100 -109.3200       7.0        45       103        60
OIR    2025250     91400   21.4100 -109.3300       6.9        45       103        60
OIR    2025250     91400   21.4100 -109.3400       6.8        45       103        60
OIR    2025250     91400   21.4100 -109.3500       6.6        46       103        60
OIR    2025250     91400   21.4100 -109.3600       6.5        46       103        60
OIR    2025250     91400   21.4100 -109.3700       6.4        46       103        60
OIR    2025250     91400   21.4100 -109.3800       6.3        46       103        60
OIR    2025250     91400   21.4100 -109.3900       6.2        46       103        60
OIR    2025250     91400   21.4100 -109.4000       6.0        47       103        60
OIR    2025250     91400   21.4100 -109.4100       5.9        47       103        60
OIR    2025250     91400   21.4100 -109.4200       5.7        47       103        60
OIR    2025250     91400   21.4100 -109.4300       5.5        47       103        60
OIR    2025250     91400   21.4100 -109.4400       5.2        48       103        60
OIR    2025250     91400   21.4100 -109.4500       5.0        48       103        60
OIR    2025250     91400   21.4100 -109.4600       4.8        48       104        60
OIR    2025250     91400   21.4100 -109.4700       4.6        48       104        60
OIR    2025250     91400   21.4100 -109.4800       4.4        48       104        60
OIR    2025250     91400   21.4100 -109.4900       4.3        48       104        60
OIR    2025250     91400   21.4100 -109.5000       4.1        48       104        60
OIR    2025250     91400   21.4100 -109.5100       4.0        48       104        60
OIR    2025250     91400   21.4000 -108.7400       5.6        54       136        60
OIR    2025250     91400   21.4000 -108.7500       5.7        52       132        60
OIR    2025250     91400   21.4000 -108.7600       5.9        49       128        60
OIR    2025250     91400   21.4000 -108.7700       6.3        47       123        60
OIR    2025250     91400   21.4000 -108.7800       6.7        46       116        60
OIR    2025250     91400   21.4000 -108.7900       6.9        46       120        60
OIR    2025250     91400   21.4000 -108.8000       7.0        46       122        60
OIR    2025250     91400   21.4000 -108.8100       7.0        46       122        60
OIR    2025250     91400   21.4000 -108.8200       7.0        46       116        60
OIR    2025250     91400   21.4000 -108.8300       7.0        46       111        60
OIR    2025250     91400   21.4000 -108.8400       7.0        47       109        60
OIR    2025250     91400   21.4000 -108.8500       7.0        47       109        60
OIR    2025250     91400   21.4000 -108.8600       7.0        47       108        60
OIR    2025250     91400   21.4000 -108.8700       7.0        47       108        60
OIR    2025250     91400   21.4000 -108.8800       7.0        47       108        60
OIR    2025250     91400   21.4000 -108.8900       7.0        47       108        60
OIR    2025250     91400   21.4000 -108.9000       7.0        47       109        60
OIR    2025250     91400   21.4000 -108.9100       7.0        47       108        60
OIR    2025250     91400   21.4000 -108.9200       7.1        47       105        60
OIR    2025250     91400   21.4000 -108.9300       7.1        47       104        60
OIR    2025250     91400   21.4000 -108.9400       7.1        47       103        60
OIR    2025250     91400   21.4000 -108.9500       7.1        46       103        60
OIR    2025250     91400   21.4000 -108.9600       7.3        46       103        60
OIR    2025250     91400   21.4000 -108.9700       7.5        45       104        60
OIR    2025250     91400   21.4000 -108.9800       7.7        44       104        60
OIR    2025250     91400   21.4000 -108.9900       7.8        43       104        60
OIR    2025250     91400   21.4000 -109.0000       7.8        43       103        60
OIR    2025250     91400   21.4000 -109.0100       7.9        43       103        60
OIR    2025250     91400   21.4000 -109.0200       7.9        43       103        60
OIR    2025250     91400   21.4000 -109.0300       7.9        43       103        60
OIR    2025250     91400   21.4000 -109.0400       7.9        43       103        60
OIR    2025250     91400   21.4000 -109.0500       7.9        43       103        60
OIR    2025250     91400   21.4000 -109.0600       7.9        43       103        60
OIR    2025250     91400   21.4000 -109.0700       7.9        43       103        60
OIR    2025250     91400   21.4000 -109.0800       7.8        43       103        60
OIR    2025250     91400   21.4000 -109.0900       7.8        43       103        60
OIR    2025250     91400   21.4000 -109.1000       7.8        43       103        60
OIR    2025250     91400   21.4000 -109.1100       7.8        43       103        60
OIR    2025250     91400   21.4000 -109.1200       7.8        43       103        60
OIR    2025250     91400   21.4000 -109.1300       7.7        43       103        60
OIR    2025250     91400   21.4000 -109.1400       7.7        43       103        60
OIR    2025250     91400   21.4000 -109.1500       7.7        43       103        60
OIR    2025250     91400   21.4000 -109.1600       7.7        43       103        60
OIR    2025250     91400   21.4000 -109.1700       7.6        43       103        60
OIR    2025250     91400   21.4000 -109.1800       7.6        44       103        60
OIR    2025250     91400   21.4000 -109.1900       7.6        44       103        60
OIR    2025250     91400   21.4000 -109.2000       7.5        44       103        60
OIR    2025250     91400   21.4000 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.4000 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.4000 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.4000 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.4000 -109.2500       7.4        44       103        60
OIR    2025250     91400   21.4000 -109.2600       7.3        44       103        60
OIR    2025250     91400   21.4000 -109.2700       7.2        44       103        60
OIR    2025250     91400   21.4000 -109.2800       7.2        45       103        60
OIR    2025250     91400   21.4000 -109.2900       7.1        45       103        60
OIR    2025250     91400   21.4000 -109.3000       7.1        45       103        60
OIR    2025250     91400   21.4000 -109.3100       7.1        45       103        60
OIR    2025250     91400   21.4000 -109.3200       7.0        45       103        60
OIR    2025250     91400   21.4000 -109.3300       7.0        45       103        60
OIR    2025250     91400   21.4000 -109.3400       6.9        45       103        60
OIR    2025250     91400   21.4000 -109.3500       6.7        45       103        60
OIR    2025250     91400   21.4000 -109.3600       6.5        45       103        60
OIR    2025250     91400   21.4000 -109.3700       6.3        46       103        60
OIR    2025250     91400   21.4000 -109.3800       6.2        46       103        60
OIR    2025250     91400   21.4000 -109.3900       6.1        46       103        60
OIR    2025250     91400   21.4000 -109.4000       6.0        46       103        60
OIR    2025250     91400   21.4000 -109.4100       5.8        46       103        60
OIR    2025250     91400   21.4000 -109.4200       5.6        47       103        60
OIR    2025250     91400   21.4000 -109.4300       5.3        47       103        60
OIR    2025250     91400   21.4000 -109.4400       5.1        48       103        60
OIR    2025250     91400   21.4000 -109.4500       4.9        48       103        60
OIR    2025250     91400   21.4000 -109.4600       4.8        48       104        60
OIR    2025250     91400   21.4000 -109.4700       4.6        48       104        60
OIR    2025250     91400   21.4000 -109.4800       4.4        48       104        60
OIR    2025250     91400   21.4000 -109.4900       4.2        48       104        60
OIR    2025250     91400   21.4000 -109.5000       4.1        48       105        60
OIR    2025250     91400   21.4000 -109.5100       4.0        48       105        60
OIR    2025250     91400   21.3900 -108.7400       5.4        53       136        60
OIR    2025250     91400   21.3900 -108.7500       5.5        52       131        60
OIR    2025250     91400   21.3900 -108.7600       5.7        50       127        60
OIR    2025250     91400   21.3900 -108.7700       6.1        47       129        60
OIR    2025250     91400   21.3900 -108.7800       6.6        46       130        60
OIR    2025250     91400   21.3900 -108.7900       6.9        46       130        60
OIR    2025250     91400   21.3900 -108.8000       6.9        46       129        60
OIR    2025250     91400   21.3900 -108.8100       7.0        46       128        60
OIR    2025250     91400   21.3900 -108.8200       7.0        46       124        60
OIR    2025250     91400   21.3900 -108.8300       7.0        46       120        60
OIR    2025250     91400   21.3900 -108.8400       7.0        47       116        60
OIR    2025250     91400   21.3900 -108.8500       7.0        47       113        60
OIR    2025250     91400   21.3900 -108.8600       7.0        47       110        60
OIR    2025250     91400   21.3900 -108.8700       7.0        47       110        60
OIR    2025250     91400   21.3900 -108.8800       7.0        47       109        60
OIR    2025250     91400   21.3900 -108.8900       7.0        47       109        60
OIR    2025250     91400   21.3900 -108.9000       7.0        47       109        60
OIR    2025250     91400   21.3900 -108.9100       7.0        47       109        60
OIR    2025250     91400   21.3900 -108.9200       7.1        47       107        60
OIR    2025250     91400   21.3900 -108.9300       7.1        47       105        60
OIR    2025250     91400   21.3900 -108.9400       7.2        46       104        60
OIR    2025250     91400   21.3900 -108.9500       7.3        46       103        60
OIR    2025250     91400   21.3900 -108.9600       7.4        45       103        60
OIR    2025250     91400   21.3900 -108.9700       7.6        44       104        60
OIR    2025250     91400   21.3900 -108.9800       7.8        44       104        60
OIR    2025250     91400   21.3900 -108.9900       7.9        43       104        60
OIR    2025250     91400   21.3900 -109.0000       7.9        43       104        60
OIR    2025250     91400   21.3900 -109.0100       8.0        43       104        60
OIR    2025250     91400   21.3900 -109.0200       8.0        43       103        60
OIR    2025250     91400   21.3900 -109.0300       8.0        43       103        60
OIR    2025250     91400   21.3900 -109.0400       8.0        43       103        60
OIR    2025250     91400   21.3900 -109.0500       8.0        43       103        60
OIR    2025250     91400   21.3900 -109.0600       7.9        43       103        60
OIR    2025250     91400   21.3900 -109.0700       7.9        43       103        60
OIR    2025250     91400   21.3900 -109.0800       7.9        43       103        60
OIR    2025250     91400   21.3900 -109.0900       7.9        43       103        60
OIR    2025250     91400   21.3900 -109.1000       7.8        43       103        60
OIR    2025250     91400   21.3900 -109.1100       7.8        43       103        60
OIR    2025250     91400   21.3900 -109.1200       7.8        43       103        60
OIR    2025250     91400   21.3900 -109.1300       7.8        43       103        60
OIR    2025250     91400   21.3900 -109.1400       7.7        43       103        60
OIR    2025250     91400   21.3900 -109.1500       7.7        43       103        60
OIR    2025250     91400   21.3900 -109.1600       7.7        43       103        60
OIR    2025250     91400   21.3900 -109.1700       7.6        43       103        60
OIR    2025250     91400   21.3900 -109.1800       7.6        43       103        60
OIR    2025250     91400   21.3900 -109.1900       7.6        44       103        60
OIR    2025250     91400   21.3900 -109.2000       7.5        44       103        60
OIR    2025250     91400   21.3900 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.3900 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.3900 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.3900 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.3900 -109.2500       7.4        44       103        60
OIR    2025250     91400   21.3900 -109.2600       7.3        44       103        60
OIR    2025250     91400   21.3900 -109.2700       7.3        44       103        60
OIR    2025250     91400   21.3900 -109.2800       7.2        44       103        60
OIR    2025250     91400   21.3900 -109.2900       7.2        44       103        60
OIR    2025250     91400   21.3900 -109.3000       7.1        45       103        60
OIR    2025250     91400   21.3900 -109.3100       7.1        45       103        60
OIR    2025250     91400   21.3900 -109.3200       7.1        45       103        60
OIR    2025250     91400   21.3900 -109.3300       7.0        45       103        60
OIR    2025250     91400   21.3900 -109.3400       7.0        45       103        60
OIR    2025250     91400   21.3900 -109.3500       6.9        45       103        60
OIR    2025250     91400   21.3900 -109.3600       6.5        45       103        60
OIR    2025250     91400   21.3900 -109.3700       6.4        45       103        60
OIR    2025250     91400   21.3900 -109.3800       6.2        45       104        60
OIR    2025250     91400   21.3900 -109.3900       6.1        46       103        60
OIR    2025250     91400   21.3900 -109.4000       5.9        46       103        60
OIR    2025250     91400   21.3900 -109.4100       5.7        46       103        60
OIR    2025250     91400   21.3900 -109.4200       5.4        46       103        60
OIR    2025250     91400   21.3900 -109.4300       5.2        47       103        60
OIR    2025250     91400   21.3900 -109.4400       5.0        47       104        60
OIR    2025250     91400   21.3900 -109.4500       4.9        48       104        60
OIR    2025250     91400   21.3900 -109.4600       4.7        48       104        60
OIR    2025250     91400   21.3900 -109.4700       4.5        48       104        60
OIR    2025250     91400   21.3900 -109.4800       4.3        47       105        60
OIR    2025250     91400   21.3900 -109.4900       4.1        47       105        60
OIR    2025250     91400   21.3900 -109.5000       4.0        47       105        60
OIR    2025250     91400   21.3800 -108.7400       5.3        53       137        60
OIR    2025250     91400   21.3800 -108.7500       5.4        52       132        60
OIR    2025250     91400   21.3800 -108.7600       5.6        50       127        60
OIR    2025250     91400   21.3800 -108.7700       5.9        48       130        60
OIR    2025250     91400   21.3800 -108.7800       6.5        46       137        60
OIR    2025250     91400   21.3800 -108.8000       6.9        46       136        60
OIR    2025250     91400   21.3800 -108.8100       6.9        46       134        60
OIR    2025250     91400   21.3800 -108.8200       7.0        46       132        60
OIR    2025250     91400   21.3800 -108.8300       7.0        46       129        60
OIR    2025250     91400   21.3800 -108.8400       7.0        47       125        60
OIR    2025250     91400   21.3800 -108.8500       7.0        47       119        60
OIR    2025250     91400   21.3800 -108.8600       7.0        47       113        60
OIR    2025250     91400   21.3800 -108.8700       7.0        47       112        60
OIR    2025250     91400   21.3800 -108.8800       7.0        47       111        60
OIR    2025250     91400   21.3800 -108.8900       7.0        47       110        60
OIR    2025250     91400   21.3800 -108.9000       7.0        47       110        60
OIR    2025250     91400   21.3800 -108.9100       7.1        47       109        60
OIR    2025250     91400   21.3800 -108.9200       7.2        47       108        60
OIR    2025250     91400   21.3800 -108.9300       7.3        46       108        60
OIR    2025250     91400   21.3800 -108.9400       7.4        46       107        60
OIR    2025250     91400   21.3800 -108.9500       7.5        46       104        60
OIR    2025250     91400   21.3800 -108.9600       7.7        45       103        60
OIR    2025250     91400   21.3800 -108.9700       7.8        44       104        60
OIR    2025250     91400   21.3800 -108.9800       7.9        44       104        60
OIR    2025250     91400   21.3800 -108.9900       8.0        44       104        60
OIR    2025250     91400   21.3800 -109.0000       8.0        43       105        60
OIR    2025250     91400   21.3800 -109.0100       8.1        43       105        60
OIR    2025250     91400   21.3800 -109.0200       8.1        43       104        60
OIR    2025250     91400   21.3800 -109.0300       8.1        43       104        60
OIR    2025250     91400   21.3800 -109.0400       8.1        43       103        60
OIR    2025250     91400   21.3800 -109.0500       8.1        43       103        60
OIR    2025250     91400   21.3800 -109.0600       8.0        43       103        60
OIR    2025250     91400   21.3800 -109.0700       8.0        43       103        60
OIR    2025250     91400   21.3800 -109.0800       8.0        43       103        60
OIR    2025250     91400   21.3800 -109.0900       7.9        43       103        60
OIR    2025250     91400   21.3800 -109.1000       7.9        43       103        60
OIR    2025250     91400   21.3800 -109.1100       7.9        43       103        60
OIR    2025250     91400   21.3800 -109.1200       7.9        43       103        60
OIR    2025250     91400   21.3800 -109.1300       7.8        43       103        60
OIR    2025250     91400   21.3800 -109.1400       7.8        43       103        60
OIR    2025250     91400   21.3800 -109.1500       7.7        43       103        60
OIR    2025250     91400   21.3800 -109.1600       7.7        43       103        60
OIR    2025250     91400   21.3800 -109.1700       7.7        43       103        60
OIR    2025250     91400   21.3800 -109.1800       7.6        43       103        60
OIR    2025250     91400   21.3800 -109.1900       7.6        44       103        60
OIR    2025250     91400   21.3800 -109.2000       7.6        44       103        60
OIR    2025250     91400   21.3800 -109.2100       7.5        44       103        60
OIR    2025250     91400   21.3800 -109.2200       7.5        44       103        60
OIR    2025250     91400   21.3800 -109.2300       7.5        44       103        60
OIR    2025250     91400   21.3800 -109.2400       7.4        44       103        60
OIR    2025250     91400   21.3800 -109.2500       7.4        44       103        60
OIR    2025250     91400   21.3800 -109.2600       7.4        44       103        60
OIR    2025250     91400   21.3800 -109.2700       7.3        44       103        60
OIR    2025250     91400   21.3800 -109.2800       7.3        44       103        60
OIR    2025250     91400   21.3800 -109.2900       7.2        44       103        60
OIR    2025250     91400   21.3800 -109.3000       7.2        44       103        60
OIR    2025250     91400   21.3800 -109.3100       7.1        44       103        60
OIR    2025250     91400   21.3800 -109.3200       7.1        44       103        60
OIR    2025250     91400   21.3800 -109.3300       7.0        44       103        60
OIR    2025250     91400   21.3800 -109.3400       7.0        44       103        60
OIR    2025250     91400   21.3800 -109.3500       6.9        44       103        60
OIR    2025250     91400   21.3800 -109.3600       6.6        44       103        60
OIR    2025250     91400   21.3800 -109.3700       6.4        44       103        60
OIR    2025250     91400   21.3800 -109.3800       6.3        45       104        60
OIR    2025250     91400   21.3800 -109.3900       6.1        45       104        60
OIR    2025250     91400   21.3800 -109.4000       5.9        45       104        60
OIR    2025250     91400   21.3800 -109.4100       5.6        45       103        60
OIR    2025250     91400   21.3800 -109.4200       5.4        46       103        60
OIR    2025250     91400   21.3800 -109.4300       5.1        46       103        60
OIR    2025250     91400   21.3800 -109.4400       5.0        47       104        60
OIR    2025250     91400   21.3800 -109.4500       4.8        47       104        60
OIR    2025250     91400   21.3800 -109.4600       4.6        47       107        60
OIR    2025250     91400   21.3800 -109.4700       4.4        47       105        60
OIR    2025250     91400   21.3800 -109.4800       4.2        47       105        60
OIR    2025250     91400   21.3800 -109.4900       4.1        47       105        60
OIR    2025250     91400   21.3700 -108.7400       5.3        53       138        60
OIR    2025250     91400   21.3700 -108.7500       5.3        52       137        60
OIR    2025250     91400   21.3700 -108.7600       5.4        51       135        60
OIR    2025250     91400   21.3700 -108.7700       5.8        49       136        60
OIR    2025250     91400   21.3700 -108.8000       6.9        46       138        60
OIR    2025250     91400   21.3700 -108.8100       6.9        46       135        60
OIR    2025250     91400   21.3700 -108.8200       6.9        46       133        60
OIR    2025250     91400   21.3700 -108.8300       6.9        46       133        60
OIR    2025250     91400   21.3700 -108.8400       6.9        47       133        60
OIR    2025250     91400   21.3700 -108.8500       6.9        47       127        60
OIR    2025250     91400   21.3700 -108.8600       7.0        47       122        60
OIR    2025250     91400   21.3700 -108.8700       7.0        47       119        60
OIR    2025250     91400   21.3700 -108.8800       7.0        47       117        60
OIR    2025250     91400   21.3700 -108.8900       7.0        47       116        60
OIR    2025250     91400   21.3700 -108.9000       7.1        47       114        60
OIR    2025250     91400   21.3700 -108.9100       7.2        47       112        60
OIR    2025250     91400   21.3700 -108.9200       7.3        46       111        60
OIR    2025250     91400   21.3700 -108.9300       7.5        45       109        60
OIR    2025250     91400   21.3700 -108.9400       7.6        45       108        60
OIR    2025250     91400   21.3700 -108.9500       7.8        45       105        60
OIR    2025250     91400   21.3700 -108.9600       7.9        45       104        60
OIR    2025250     91400   21.3700 -108.9700       8.0        44       104        60
OIR    2025250     91400   21.3700 -108.9800       8.0        44       104        60
OIR    2025250     91400   21.3700 -108.9900       8.1        44       104        60
OIR    2025250     91400   21.3700 -109.0000       8.1        44       105        60
OIR    2025250     91400   21.3700 -109.0100       8.1        44       105        60
OIR    2025250     91400   21.3700 -109.0200       8.1        44       105        60
OIR    2025250     91400   21.3700 -109.0300       8.1        44       104        60
OIR    2025250     91400   21.3700 -109.0400       8.1        44       103        60
OIR    2025250     91400   21.3700 -109.0500       8.1        43       103        60
OIR    2025250     91400   21.3700 -109.0600       8.1        43       103        60
OIR    2025250     91400   21.3700 -109.0700       8.1        43       103        60
OIR    2025250     91400   21.3700 -109.0800       8.0        43       103        60
OIR    2025250     91400   21.3700 -109.0900       8.0        43       103        60
OIR    2025250     91400   21.3700 -109.1000       8.0        43       103        60
OIR    2025250     91400   21.3700 -109.1100       8.0        43       103        60
OIR    2025250     91400   21.3700 -109.1200       7.9        43       103        60
OIR    2025250     91400   21.3700 -109.1300       7.9        43       103        60
OIR    2025250     91400   21.3700 -109.1400       7.8        43       103        60
OIR    2025250     91400   21.3700 -109.1500       7.8        43       103        60
OIR    2025250     91400   21.3700 -109.1600       7.7        43       103        60
OIR    2025250     91400   21.3700 -109.1700       7.7        43       103        60
OIR    2025250     91400   21.3700 -109.1800       7.7        43       103        60
OIR    2025250     91400   21.3700 -109.1900       7.6        43       103        60
OIR    2025250     91400   21.3700 -109.2000       7.6        43       103        60
OIR    2025250     91400   21.3700 -109.2100       7.5        43       103        60
OIR    2025250     91400   21.3700 -109.2200       7.5        43       103        60
OIR    2025250     91400   21.3700 -109.2300       7.5        43       103        60
OIR    2025250     91400   21.3700 -109.2400       7.5        43       103        60
OIR    2025250     91400   21.3700 -109.2500       7.4        43       103        60
OIR    2025250     91400   21.3700 -109.2600       7.4        43       103        60
OIR    2025250     91400   21.3700 -109.2700       7.4        44       103        60
OIR    2025250     91400   21.3700 -109.2800       7.3        44       103        60
OIR    2025250     91400   21.3700 -109.2900       7.3        44       103        60
OIR    2025250     91400   21.3700 -109.3000       7.2        44       103        60
OIR    2025250     91400   21.3700 -109.3100       7.2        44       103        60
OIR    2025250     91400   21.3700 -109.3200       7.1        44       103        60
OIR    2025250     91400   21.3700 -109.3300       7.1        44       103        60
OIR    2025250     91400   21.3700 -109.3400       7.0        44       103        60
OIR    2025250     91400   21.3700 -109.3500       7.0        44       103        60
OIR    2025250     91400   21.3700 -109.3600       6.7        44       104        60
OIR    2025250     91400   21.3700 -109.3700       6.5        44       104        60
OIR    2025250     91400   21.3700 -109.3800       6.3        44       104        60
OIR    2025250     91400   21.3700 -109.3900       6.1        44       104        60
OIR    2025250     91400   21.3700 -109.4000       5.8        45       103        60
OIR    2025250     91400   21.3700 -109.4100       5.5        45       103        60
OIR    2025250     91400   21.3700 -109.4200       5.3        45       103        60
OIR    2025250     91400   21.3700 -109.4300       5.0        46       103        60
OIR    2025250     91400   21.3700 -109.4400       4.9        46       104        60
OIR    2025250     91400   21.3700 -109.4500       4.7        47       104        60
OIR    2025250     91400   21.3700 -109.4600       4.6        47       105        60
OIR    2025250     91400   21.3700 -109.4700       4.3        47       105        60
OIR    2025250     91400   21.3700 -109.4800       4.1        47       105        60
OIR    2025250     91400   21.3700 -109.4900       4.0        47       104        60
OIR    2025250     91400   21.3600 -108.8100       6.9        46       137        60
OIR    2025250     91400   21.3600 -108.8200       6.9        46       133        60
OIR    2025250     91400   21.3600 -108.8300       6.9        47       135        60
OIR    2025250     91400   21.3600 -108.8400       6.9        47       137        60
OIR    2025250     91400   21.3600 -108.8500       6.9        47       135        60
OIR    2025250     91400   21.3600 -108.8600       6.9        47       130        60
OIR    2025250     91400   21.3600 -108.8700       7.0        47       127        60
OIR    2025250     91400   21.3600 -108.8800       7.0        47       126        60
OIR    2025250     91400   21.3600 -108.8900       7.1        47       125        60
OIR    2025250     91400   21.3600 -108.9000       7.2        47       122        60
OIR    2025250     91400   21.3600 -108.9100       7.4        46       117        60
OIR    2025250     91400   21.3600 -108.9200       7.6        45       114        60
OIR    2025250     91400   21.3600 -108.9300       7.7        44       111        60
OIR    2025250     91400   21.3600 -108.9400       7.8        45       108        60
OIR    2025250     91400   21.3600 -108.9500       7.9        44       107        60
OIR    2025250     91400   21.3600 -108.9600       8.0        44       105        60
OIR    2025250     91400   21.3600 -108.9700       8.0        44       104        60
OIR    2025250     91400   21.3600 -108.9800       8.1        44       104        60
OIR    2025250     91400   21.3600 -108.9900       8.2        44       104        60
OIR    2025250     91400   21.3600 -109.0000       8.2        44       104        60
OIR    2025250     91400   21.3600 -109.0100       8.2        44       104        60
OIR    2025250     91400   21.3600 -109.0200       8.2        44       104        60
OIR    2025250     91400   21.3600 -109.0300       8.2        44       104        60
OIR    2025250     91400   21.3600 -109.0400       8.2        44       103        60
OIR    2025250     91400   21.3600 -109.0500       8.2        44       103        60
OIR    2025250     91400   21.3600 -109.0600       8.2        43       103        60
OIR    2025250     91400   21.3600 -109.0700       8.1        43       103        60
OIR    2025250     91400   21.3600 -109.0800       8.1        43       103        60
OIR    2025250     91400   21.3600 -109.0900       8.1        43       103        60
OIR    2025250     91400   21.3600 -109.1000       8.1        43       103        60
OIR    2025250     91400   21.3600 -109.1100       8.0        43       103        60
OIR    2025250     91400   21.3600 -109.1200       8.0        43       103        60
OIR    2025250     91400   21.3600 -109.1300       8.0        43       103        60
OIR    2025250     91400   21.3600 -109.1400       7.9        43       103        60
OIR    2025250     91400   21.3600 -109.1500       7.9        43       103        60
OIR    2025250     91400   21.3600 -109.1600       7.8        43       103        60
OIR    2025250     91400   21.3600 -109.1700       7.8        43       103        60
OIR    2025250     91400   21.3600 -109.1800       7.7        43       103        60
OIR    2025250     91400   21.3600 -109.1900       7.6        43       103        60
OIR    2025250     91400   21.3600 -109.2000       7.6        43       103        60
OIR    2025250     91400   21.3600 -109.2100       7.6        43       103        60
OIR    2025250     91400   21.3600 -109.2200       7.5        43       103        60
OIR    2025250     91400   21.3600 -109.2300       7.5        43       103        60
OIR    2025250     91400   21.3600 -109.2400       7.5        43       103        60
OIR    2025250     91400   21.3600 -109.2500       7.4        43       103        60
OIR    2025250     91400   21.3600 -109.2600       7.4        43       103        60
OIR    2025250     91400   21.3600 -109.2700       7.4        43       103        60
OIR    2025250     91400   21.3600 -109.2800       7.3        43       103        60
OIR    2025250     91400   21.3600 -109.2900       7.3        44       103        60
OIR    2025250     91400   21.3600 -109.3000       7.2        44       103        60
OIR    2025250     91400   21.3600 -109.3100       7.2        44       103        60
OIR    2025250     91400   21.3600 -109.3200       7.2        44       103        60
OIR    2025250     91400   21.3600 -109.3300       7.1        44       103        60
OIR    2025250     91400   21.3600 -109.3400       7.1        44       103        60
OIR    2025250     91400   21.3600 -109.3500       7.0        44       104        60
OIR    2025250     91400   21.3600 -109.3600       6.9        43       104        60
OIR    2025250     91400   21.3600 -109.3700       6.6        44       104        60
OIR    2025250     91400   21.3600 -109.3800       6.3        44       104        60
OIR    2025250     91400   21.3600 -109.3900       6.0        44       104        60
OIR    2025250     91400   21.3600 -109.4000       5.7        44       103        60
OIR    2025250     91400   21.3600 -109.4100       5.4        45       103        60
OIR    2025250     91400   21.3600 -109.4200       5.2        45       103        60
OIR    2025250     91400   21.3600 -109.4300       5.0        45       103        60
OIR    2025250     91400   21.3600 -109.4400       4.8        46       103        60
OIR    2025250     91400   21.3600 -109.4500       4.7        47       104        60
OIR    2025250     91400   21.3600 -109.4600       4.4        47       104        60
OIR    2025250     91400   21.3600 -109.4700       4.2        47       104        60
OIR    2025250     91400   21.3600 -109.4800       4.0        47       104        60
OIR    2025250     91400   21.3500 -108.8300       6.9        47       139        60
OIR    2025250     91400   21.3500 -108.8400       6.9        47       137        60
OIR    2025250     91400   21.3500 -108.8500       6.9        47       135        60
OIR    2025250     91400   21.3500 -108.8600       6.9        47       134        60
OIR    2025250     91400   21.3500 -108.8700       6.9        47       133        60
OIR    2025250     91400   21.3500 -108.8800       7.0        47       131        60
OIR    2025250     91400   21.3500 -108.8900       7.1        47       130        60
OIR    2025250     91400   21.3500 -108.9000       7.4        46       127        60
OIR    2025250     91400   21.3500 -108.9100       7.7        45       120        60
OIR    2025250     91400   21.3500 -108.9200       7.8        44       115        60
OIR    2025250     91400   21.3500 -108.9300       7.9        44       112        60
OIR    2025250     91400   21.3500 -108.9400       7.9        44       109        60
OIR    2025250     91400   21.3500 -108.9500       8.0        44       107        60
OIR    2025250     91400   21.3500 -108.9600       8.1        44       105        60
OIR    2025250     91400   21.3500 -108.9700       8.1        44       105        60
OIR    2025250     91400   21.3500 -108.9800       8.2        44       104        60
OIR    2025250     91400   21.3500 -108.9900       8.2        44       104        60
OIR    2025250     91400   21.3500 -109.0000       8.2        44       103        60
OIR    2025250     91400   21.3500 -109.0100       8.2        44       103        60
OIR    2025250     91400   21.3500 -109.0200       8.2        44       103        60
OIR    2025250     91400   21.3500 -109.0300       8.2        44       103        60
OIR    2025250     91400   21.3500 -109.0400       8.2        44       103        60
OIR    2025250     91400   21.3500 -109.0500       8.2        44       103        60
OIR    2025250     91400   21.3500 -109.0600       8.2        43       103        60
OIR    2025250     91400   21.3500 -109.0700       8.2        43       103        60
OIR    2025250     91400   21.3500 -109.0800       8.2        43       103        60
OIR    2025250     91400   21.3500 -109.0900       8.1        43       103        60
OIR    2025250     91400   21.3500 -109.1000       8.1        43       103        60
OIR    2025250     91400   21.3500 -109.1100       8.1        43       103        60
OIR    2025250     91400   21.3500 -109.1200       8.1        43       103        60
OIR    2025250     91400   21.3500 -109.1300       8.0        43       103        60
OIR    2025250     91400   21.3500 -109.1400       8.0        43       103        60
OIR    2025250     91400   21.3500 -109.1500       7.9        43       103        60
OIR    2025250     91400   21.3500 -109.1600       7.9        43       103        60
OIR    2025250     91400   21.3500 -109.1700       7.8        43       103        60
OIR    2025250     91400   21.3500 -109.1800       7.8        43       103        60
OIR    2025250     91400   21.3500 -109.1900       7.7        43       103        60
OIR    2025250     91400   21.3500 -109.2000       7.6        43       103        60
OIR    2025250     91400   21.3500 -109.2100       7.6        43       103        60
OIR    2025250     91400   21.3500 -109.2200       7.6        43       103        60
OIR    2025250     91400   21.3500 -109.2300       7.5        43       103        60
OIR    2025250     91400   21.3500 -109.2400       7.5        43       103        60
OIR    2025250     91400   21.3500 -109.2500       7.5        43       103        60
OIR    2025250     91400   21.3500 -109.2600       7.4        43       103        60
OIR    2025250     91400   21.3500 -109.2700       7.4        43       103        60
OIR    2025250     91400   21.3500 -109.2800       7.4        43       103        60
OIR    2025250     91400   21.3500 -109.2900       7.3        43       103        60
OIR    2025250     91400   21.3500 -109.3000       7.3        43       103        60
OIR    2025250     91400   21.3500 -109.3100       7.2        43       103        60
OIR    2025250     91400   21.3500 -109.3200       7.2        43       103        60
OIR    2025250     91400   21.3500 -109.3300       7.2        43       103        60
OIR    2025250     91400   21.3500 -109.3400       7.1        43       103        60
OIR    2025250     91400   21.3500 -109.3500       7.1        43       103        60
OIR    2025250     91400   21.3500 -109.3600       7.0        43       104        60
OIR    2025250     91400   21.3500 -109.3700       6.7        43       104        60
OIR    2025250     91400   21.3500 -109.3800       6.3        43       104        60
OIR    2025250     91400   21.3500 -109.3900       6.0        44       103        60
OIR    2025250     91400   21.3500 -109.4000       5.6        44       103        60
OIR    2025250     91400   21.3500 -109.4100       5.3        44       103        60
OIR    2025250     91400   21.3500 -109.4200       5.1        45       103        60
OIR    2025250     91400   21.3500 -109.4300       4.9        45       103        60
OIR    2025250     91400   21.3500 -109.4400       4.7        46       103        60
OIR    2025250     91400   21.3500 -109.4500       4.6        46       103        60
OIR    2025250     91400   21.3500 -109.4600       4.3        47       104        60
OIR    2025250     91400   21.3500 -109.4700       4.1        47       104        60
OIR    2025250     91400   21.3500 -109.4800       4.0        47       104        60
OIR    2025250     91400   21.3400 -108.8400       6.9        47       138        60
OIR    2025250     91400   21.3400 -108.8500       6.9        47       132        60
OIR    2025250     91400   21.3400 -108.8600       6.9        47       135        60
OIR    2025250     91400   21.3400 -108.8700       6.9        47       137        60
OIR    2025250     91400   21.3400 -108.8800       7.1        46       137        60
OIR    2025250     91400   21.3400 -108.8900       7.5        44       135        60
OIR    2025250     91400   21.3400 -108.9000       7.8        44       133        60
OIR    2025250     91400   21.3400 -108.9100       7.9        44       122        60
OIR    2025250     91400   21.3400 -108.9200       7.9        44       112        60
OIR    2025250     91400   21.3400 -108.9300       8.0        44       110        60
OIR    2025250     91400   21.3400 -108.9400       8.0        44       109        60
OIR    2025250     91400   21.3400 -108.9500       8.1        44       108        60
OIR    2025250     91400   21.3400 -108.9600       8.1        44       107        60
OIR    2025250     91400   21.3400 -108.9700       8.2        44       105        60
OIR    2025250     91400   21.3400 -108.9800       8.2        44       105        60
OIR    2025250     91400   21.3400 -108.9900       8.2        44       104        60
OIR    2025250     91400   21.3400 -109.0000       8.2        44       104        60
OIR    2025250     91400   21.3400 -109.0100       8.2        44       104        60
OIR    2025250     91400   21.3400 -109.0200       8.2        44       103        60
OIR    2025250     91400   21.3400 -109.0300       8.2        44       103        60
OIR    2025250     91400   21.3400 -109.0400       8.2        44       103        60
OIR    2025250     91400   21.3400 -109.0500       8.2        43       103        60
OIR    2025250     91400   21.3400 -109.0600       8.2        43       103        60
OIR    2025250     91400   21.3400 -109.0700       8.2        43       103        60
OIR    2025250     91400   21.3400 -109.0800       8.2        43       103        60
OIR    2025250     91400   21.3400 -109.0900       8.2        43       103        60
OIR    2025250     91400   21.3400 -109.1000       8.2        43       103        60
OIR    2025250     91400   21.3400 -109.1100       8.2        43       103        60
OIR    2025250     91400   21.3400 -109.1200       8.1        43       103        60
OIR    2025250     91400   21.3400 -109.1300       8.1        43       103        60
OIR    2025250     91400   21.3400 -109.1400       8.1        43       103        60
OIR    2025250     91400   21.3400 -109.1500       8.0        43       103        60
OIR    2025250     91400   21.3400 -109.1600       8.0        43       103        60
OIR    2025250     91400   21.3400 -109.1700       7.9        43       103        60
OIR    2025250     91400   21.3400 -109.1800       7.8        43       103        60
OIR    2025250     91400   21.3400 -109.1900       7.8        43       103        60
OIR    2025250     91400   21.3400 -109.2000       7.7        43       103        60
OIR    2025250     91400   21.3400 -109.2100       7.6        43       103        60
OIR    2025250     91400   21.3400 -109.2200       7.6        43       103        60
OIR    2025250     91400   21.3400 -109.2300       7.5        43       103        60
OIR    2025250     91400   21.3400 -109.2400       7.5        43       103        60
OIR    2025250     91400   21.3400 -109.2500       7.5        43       103        60
OIR    2025250     91400   21.3400 -109.2600       7.5        43       103        60
OIR    2025250     91400   21.3400 -109.2700       7.4        43       103        60
OIR    2025250     91400   21.3400 -109.2800       7.4        43       103        60
OIR    2025250     91400   21.3400 -109.2900       7.4        43       103        60
OIR    2025250     91400   21.3400 -109.3000       7.3        43       103        60
OIR    2025250     91400   21.3400 -109.3100       7.3        43       103        60
OIR    2025250     91400   21.3400 -109.3200       7.2        43       103        60
OIR    2025250     91400   21.3400 -109.3300       7.2        43       103        60
OIR    2025250     91400   21.3400 -109.3400       7.1        43       103        60
OIR    2025250     91400   21.3400 -109.3500       7.1        43       103        60
OIR    2025250     91400   21.3400 -109.3600       7.0        43       103        60
OIR    2025250     91400   21.3400 -109.3700       6.8        43       103        60
OIR    2025250     91400   21.3400 -109.3800       6.3        43       103        60
OIR    2025250     91400   21.3400 -109.3900       5.9        44       103        60
OIR    2025250     91400   21.3400 -109.4000       5.5        44       103        60
OIR    2025250     91400   21.3400 -109.4100       5.2        44       103        60
OIR    2025250     91400   21.3400 -109.4200       5.0        45       103        60
OIR    2025250     91400   21.3400 -109.4300       4.9        45       103        60
OIR    2025250     91400   21.3400 -109.4400       4.7        46       103        60
OIR    2025250     91400   21.3400 -109.4500       4.5        46       103        60
OIR    2025250     91400   21.3400 -109.4600       4.2        46       104        60
OIR    2025250     91400   21.3400 -109.4700       4.0        47       104        60
OIR    2025250     91400   21.3300 -108.8600       6.9        47       137        60
OIR    2025250     91400   21.3300 -108.8700       7.0        46       137        60
OIR    2025250     91400   21.3300 -108.8800       7.3        44       136        60
OIR    2025250     91400   21.3300 -108.8900       7.7        43       135        60
OIR    2025250     91400   21.3300 -108.9000       7.8        43       134        60
OIR    2025250     91400   21.3300 -108.9100       7.9        44       126        60
OIR    2025250     91400   21.3300 -108.9200       8.0        44       116        60
OIR    2025250     91400   21.3300 -108.9300       8.0        44       111        60
OIR    2025250     91400   21.3300 -108.9400       8.1        44       110        60
OIR    2025250     91400   21.3300 -108.9500       8.2        44       109        60
OIR    2025250     91400   21.3300 -108.9600       8.2        44       108        60
OIR    2025250     91400   21.3300 -108.9700       8.3        44       107        60
OIR    2025250     91400   21.3300 -108.9800       8.3        44       107        60
OIR    2025250     91400   21.3300 -108.9900       8.3        44       105        60
OIR    2025250     91400   21.3300 -109.0000       8.3        44       105        60
OIR    2025250     91400   21.3300 -109.0100       8.3        44       104        60
OIR    2025250     91400   21.3300 -109.0200       8.3        44       104        60
OIR    2025250     91400   21.3300 -109.0300       8.3        44       103        60
OIR    2025250     91400   21.3300 -109.0400       8.3        44       103        60
OIR    2025250     91400   21.3300 -109.0500       8.3        43       103        60
OIR    2025250     91400   21.3300 -109.0600       8.3        43       103        60
OIR    2025250     91400   21.3300 -109.0700       8.3        43       103        60
OIR    2025250     91400   21.3300 -109.0800       8.2        43       103        60
OIR    2025250     91400   21.3300 -109.0900       8.2        43       103        60
OIR    2025250     91400   21.3300 -109.1000       8.2        43       103        60
OIR    2025250     91400   21.3300 -109.1100       8.2        43       103        60
OIR    2025250     91400   21.3300 -109.1200       8.2        43       103        60
OIR    2025250     91400   21.3300 -109.1300       8.2        43       103        60
OIR    2025250     91400   21.3300 -109.1400       8.1        43       103        60
OIR    2025250     91400   21.3300 -109.1500       8.1        43       103        60
OIR    2025250     91400   21.3300 -109.1600       8.0        43       103        60
OIR    2025250     91400   21.3300 -109.1700       8.0        43       103        60
OIR    2025250     91400   21.3300 -109.1800       7.9        43       103        60
OIR    2025250     91400   21.3300 -109.1900       7.9        43       103        60
OIR    2025250     91400   21.3300 -109.2000       7.8        43       103        60
OIR    2025250     91400   21.3300 -109.2100       7.7        43       103        60
OIR    2025250     91400   21.3300 -109.2200       7.6        43       103        60
OIR    2025250     91400   21.3300 -109.2300       7.6        43       103        60
OIR    2025250     91400   21.3300 -109.2400       7.5        43       103        60
OIR    2025250     91400   21.3300 -109.2500       7.5        43       103        60
OIR    2025250     91400   21.3300 -109.2600       7.5        43       103        60
OIR    2025250     91400   21.3300 -109.2700       7.5        43       103        60
OIR    2025250     91400   21.3300 -109.2800       7.4        43       103        60
OIR    2025250     91400   21.3300 -109.2900       7.4        43       103        60
OIR    2025250     91400   21.3300 -109.3000       7.3        43       103        60
OIR    2025250     91400   21.3300 -109.3100       7.3        43       103        60
OIR    2025250     91400   21.3300 -109.3200       7.2        43       103        60
OIR    2025250     91400   21.3300 -109.3300       7.2        43       103        60
OIR    2025250     91400   21.3300 -109.3400       7.1        43       103        60
OIR    2025250     91400   21.3300 -109.3500       7.1        43       103        60
OIR    2025250     91400   21.3300 -109.3600       7.0        43       103        60
OIR    2025250     91400   21.3300 -109.3700       6.9        43       103        60
OIR    2025250     91400   21.3300 -109.3800       6.2        44       103        60
OIR    2025250     91400   21.3300 -109.3900       5.7        44       103        60
OIR    2025250     91400   21.3300 -109.4000       5.3        44       103        60
OIR    2025250     91400   21.3300 -109.4100       5.2        44       103        60
OIR    2025250     91400   21.3300 -109.4200       5.0        45       103        60
OIR    2025250     91400   21.3300 -109.4300       4.8        45       103        60
OIR    2025250     91400   21.3300 -109.4400       4.6        45       103        60
OIR    2025250     91400   21.3300 -109.4500       4.4        46       103        60
OIR    2025250     91400   21.3300 -109.4600       4.1        46       104        60
OIR    2025250     91400   21.3300 -109.4700       4.0        46       104        60
OIR    2025250     91400   21.3200 -108.8700       7.2        45       139        60
OIR    2025250     91400   21.3200 -108.8800       7.5        44       135        60
OIR    2025250     91400   21.3200 -108.8900       7.8        43       133        60
OIR    2025250     91400   21.3200 -108.9000       7.9        43       131        60
OIR    2025250     91400   21.3200 -108.9100       8.0        43       127        60
OIR    2025250     91400   21.3200 -108.9200       8.0        44       121        60
OIR    2025250     91400   21.3200 -108.9300       8.1        44       115        60
OIR    2025250     91400   21.3200 -108.9400       8.2        45       114        60
OIR    2025250     91400   21.3200 -108.9500       8.3        45       113        60
OIR    2025250     91400   21.3200 -108.9600       8.3        45       111        60
OIR    2025250     91400   21.3200 -108.9700       8.3        44       110        60
OIR    2025250     91400   21.3200 -108.9800       8.4        44       109        60
OIR    2025250     91400   21.3200 -108.9900       8.4        44       107        60
OIR    2025250     91400   21.3200 -109.0000       8.4        44       105        60
OIR    2025250     91400   21.3200 -109.0100       8.4        44       105        60
OIR    2025250     91400   21.3200 -109.0200       8.4        44       105        60
OIR    2025250     91400   21.3200 -109.0300       8.4        44       104        60
OIR    2025250     91400   21.3200 -109.0400       8.4        43       104        60
OIR    2025250     91400   21.3200 -109.0500       8.4        43       104        60
OIR    2025250     91400   21.3200 -109.0600       8.3        43       103        60
OIR    2025250     91400   21.3200 -109.0700       8.3        43       103        60
OIR    2025250     91400   21.3200 -109.0800       8.3        43       103        60
OIR    2025250     91400   21.3200 -109.0900       8.3        43       103        60
OIR    2025250     91400   21.3200 -109.1000       8.3        43       103        60
OIR    2025250     91400   21.3200 -109.1100       8.3        43       103        60
OIR    2025250     91400   21.3200 -109.1200       8.2        43       103        60
OIR    2025250     91400   21.3200 -109.1300       8.2        43       103        60
OIR    2025250     91400   21.3200 -109.1400       8.2        43       103        60
OIR    2025250     91400   21.3200 -109.1500       8.1        43       103        60
OIR    2025250     91400   21.3200 -109.1600       8.1        43       103        60
OIR    2025250     91400   21.3200 -109.1700       8.0        43       103        60
OIR    2025250     91400   21.3200 -109.1800       8.0        43       103        60
OIR    2025250     91400   21.3200 -109.1900       7.9        43       103        60
OIR    2025250     91400   21.3200 -109.2000       7.9        43       103        60
OIR    2025250     91400   21.3200 -109.2100       7.8        43       103        60
OIR    2025250     91400   21.3200 -109.2200       7.7        43       103        60
OIR    2025250     91400   21.3200 -109.2300       7.6        43       103        60
OIR    2025250     91400   21.3200 -109.2400       7.6        43       103        60
OIR    2025250     91400   21.3200 -109.2500       7.5        43       103        60
OIR    2025250     91400   21.3200 -109.2600       7.5        43       103        60
OIR    2025250     91400   21.3200 -109.2700       7.5        43       103        60
OIR    2025250     91400   21.3200 -109.2800       7.5        43       103        60
OIR    2025250     91400   21.3200 -109.2900       7.4        43       103        60
OIR    2025250     91400   21.3200 -109.3000       7.4        43       103        60
OIR    2025250     91400   21.3200 -109.3100       7.3        43       103        60
OIR    2025250     91400   21.3200 -109.3200       7.2        43       103        60
OIR    2025250     91400   21.3200 -109.3300       7.2        43       103        60
OIR    2025250     91400   21.3200 -109.3400       7.2        43       103        60
OIR    2025250     91400   21.3200 -109.3500       7.1        43       103        60
OIR    2025250     91400   21.3200 -109.3600       7.0        43       103        60
OIR    2025250     91400   21.3200 -109.3700       6.8        44       103        60
OIR    2025250     91400   21.3200 -109.3800       6.0        44       103        60
OIR    2025250     91400   21.3200 -109.3900       5.5        44       103        60
OIR    2025250     91400   21.3200 -109.4000       5.2        44       103        60
OIR    2025250     91400   21.3200 -109.4100       5.1        44       103        60
OIR    2025250     91400   21.3200 -109.4200       5.0        45       103        60
OIR    2025250     91400   21.3200 -109.4300       4.8        45       103        60
OIR    2025250     91400   21.3200 -109.4400       4.6        45       103        60
OIR    2025250     91400   21.3200 -109.4500       4.3        46       103        60
OIR    2025250     91400   21.3200 -109.4600       4.1        46       103        60
OIR    2025250     91400   21.3100 -108.8700       7.3        44       138        60
OIR    2025250     91400   21.3100 -108.8800       7.6        44       133        60
OIR    2025250     91400   21.3100 -108.8900       7.8        43       130        60
OIR    2025250     91400   21.3100 -108.9000       8.0        43       127        60
OIR    2025250     91400   21.3100 -108.9100       8.0        44       124        60
OIR    2025250     91400   21.3100 -108.9200       8.1        44       121        60
OIR    2025250     91400   21.3100 -108.9300       8.3        45       117        60
OIR    2025250     91400   21.3100 -108.9400       8.3        45       116        60
OIR    2025250     91400   21.3100 -108.9500       8.3        45       114        60
OIR    2025250     91400   21.3100 -108.9600       8.4        45       113        60
OIR    2025250     91400   21.3100 -108.9700       8.4        45       111        60
OIR    2025250     91400   21.3100 -108.9800       8.4        44       110        60
OIR    2025250     91400   21.3100 -108.9900       8.4        44       108        60
OIR    2025250     91400   21.3100 -109.0000       8.4        44       107        60
OIR    2025250     91400   21.3100 -109.0100       8.4        44       107        60
OIR    2025250     91400   21.3100 -109.0200       8.4        44       107        60
OIR    2025250     91400   21.3100 -109.0300       8.4        44       107        60
OIR    2025250     91400   21.3100 -109.0400       8.4        43       105        60
OIR    2025250     91400   21.3100 -109.0500       8.4        43       104        60
OIR    2025250     91400   21.3100 -109.0600       8.4        43       104        60
OIR    2025250     91400   21.3100 -109.0700       8.4        43       103        60
OIR    2025250     91400   21.3100 -109.0800       8.4        43       103        60
OIR    2025250     91400   21.3100 -109.0900       8.3        43       103        60
OIR    2025250     91400   21.3100 -109.1000       8.3        43       104        60
OIR    2025250     91400   21.3100 -109.1100       8.3        43       104        60
OIR    2025250     91400   21.3100 -109.1200       8.3        43       103        60
OIR    2025250     91400   21.3100 -109.1300       8.2        43       103        60
OIR    2025250     91400   21.3100 -109.1400       8.2        43       103        60
OIR    2025250     91400   21.3100 -109.1500       8.2        43       103        60
OIR    2025250     91400   21.3100 -109.1600       8.1        43       103        60
OIR    2025250     91400   21.3100 -109.1700       8.1        43       103        60
OIR    2025250     91400   21.3100 -109.1800       8.0        43       103        60
OIR    2025250     91400   21.3100 -109.1900       8.0        43       103        60
OIR    2025250     91400   21.3100 -109.2000       7.9        42       103        60
OIR    2025250     91400   21.3100 -109.2100       7.9        42       103        60
OIR    2025250     91400   21.3100 -109.2200       7.8        42       103        60
OIR    2025250     91400   21.3100 -109.2300       7.8        42       103        60
OIR    2025250     91400   21.3100 -109.2400       7.7        43       103        60
OIR    2025250     91400   21.3100 -109.2500       7.6        43       103        60
OIR    2025250     91400   21.3100 -109.2600       7.6        43       103        60
OIR    2025250     91400   21.3100 -109.2700       7.5        43       103        60
OIR    2025250     91400   21.3100 -109.2800       7.5        43       103        60
OIR    2025250     91400   21.3100 -109.2900       7.5        43       103        60
OIR    2025250     91400   21.3100 -109.3000       7.4        43       103        60
OIR    2025250     91400   21.3100 -109.3100       7.4        43       103        60
OIR    2025250     91400   21.3100 -109.3200       7.3        43       103        60
OIR    2025250     91400   21.3100 -109.3300       7.2        43       103        60
OIR    2025250     91400   21.3100 -109.3400       7.2        43       103        60
OIR    2025250     91400   21.3100 -109.3500       7.1        43       103        60
OIR    2025250     91400   21.3100 -109.3600       7.0        43       103        60
OIR    2025250     91400   21.3100 -109.3700       6.7        43       103        60
OIR    2025250     91400   21.3100 -109.3800       5.8        43       104        60
OIR    2025250     91400   21.3100 -109.3900       5.4        44       103        60
OIR    2025250     91400   21.3100 -109.4000       5.2        44       103        60
OIR    2025250     91400   21.3100 -109.4100       5.1        44       103        60
OIR    2025250     91400   21.3100 -109.4200       4.9        45       103        60
OIR    2025250     91400   21.3100 -109.4300       4.7        45       103        60
OIR    2025250     91400   21.3100 -109.4400       4.5        45       104        60
OIR    2025250     91400   21.3100 -109.4500       4.3        46       104        60
OIR    2025250     91400   21.3100 -109.4600       4.0        45       104        60
OIR    2025250     91400   21.3000 -108.8700       7.4        43       137        60
OIR    2025250     91400   21.3000 -108.8800       7.7        43       130        60
OIR    2025250     91400   21.3000 -108.8900       7.9        43       126        60
OIR    2025250     91400   21.3000 -108.9000       8.2        44       122        60
OIR    2025250     91400   21.3000 -108.9100       8.3        45       119        60
OIR    2025250     91400   21.3000 -108.9200       8.5        47       116        60
OIR    2025250     91400   21.3000 -108.9300       8.6        47       115        60
OIR    2025250     91400   21.3000 -108.9400       8.6        47       114        60
OIR    2025250     91400   21.3000 -108.9500       8.5        46       113        60
OIR    2025250     91400   21.3000 -108.9600       8.5        45       112        60
OIR    2025250     91400   21.3000 -108.9700       8.5        45       110        60
OIR    2025250     91400   21.3000 -108.9800       8.5        44       109        60
OIR    2025250     91400   21.3000 -108.9900       8.5        44       108        60
OIR    2025250     91400   21.3000 -109.0000       8.5        44       107        60
OIR    2025250     91400   21.3000 -109.0100       8.5        44       105        60
OIR    2025250     91400   21.3000 -109.0200       8.4        44       105        60
OIR    2025250     91400   21.3000 -109.0300       8.4        44       105        60
OIR    2025250     91400   21.3000 -109.0400       8.4        43       104        60
OIR    2025250     91400   21.3000 -109.0500       8.4        43       104        60
OIR    2025250     91400   21.3000 -109.0600       8.4        43       104        60
OIR    2025250     91400   21.3000 -109.0700       8.4        43       103        60
OIR    2025250     91400   21.3000 -109.0800       8.4        43       103        60
OIR    2025250     91400   21.3000 -109.0900       8.4        43       103        60
OIR    2025250     91400   21.3000 -109.1000       8.3        43       103        60
OIR    2025250     91400   21.3000 -109.1100       8.3        43       104        60
OIR    2025250     91400   21.3000 -109.1200       8.3        43       104        60
OIR    2025250     91400   21.3000 -109.1300       8.3        43       104        60
OIR    2025250     91400   21.3000 -109.1400       8.3        43       103        60
OIR    2025250     91400   21.3000 -109.1500       8.2        43       103        60
OIR    2025250     91400   21.3000 -109.1600       8.2        43       103        60
OIR    2025250     91400   21.3000 -109.1700       8.1        43       103        60
OIR    2025250     91400   21.3000 -109.1800       8.1        43       103        60
OIR    2025250     91400   21.3000 -109.1900       8.0        42       103        60
OIR    2025250     91400   21.3000 -109.2000       8.0        42       103        60
OIR    2025250     91400   21.3000 -109.2100       7.9        42       103        60
OIR    2025250     91400   21.3000 -109.2200       7.9        42       103        60
OIR    2025250     91400   21.3000 -109.2300       7.8        42       103        60
OIR    2025250     91400   21.3000 -109.2400       7.7        42       103        60
OIR    2025250     91400   21.3000 -109.2500       7.7        42       103        60
OIR    2025250     91400   21.3000 -109.2600       7.6        42       103        60
OIR    2025250     91400   21.3000 -109.2700       7.6        42       103        60
OIR    2025250     91400   21.3000 -109.2800       7.5        42       103        60
OIR    2025250     91400   21.3000 -109.2900       7.5        42       103        60
OIR    2025250     91400   21.3000 -109.3000       7.4        42       103        60
OIR    2025250     91400   21.3000 -109.3100       7.4        43       103        60
OIR    2025250     91400   21.3000 -109.3200       7.3        43       103        60
OIR    2025250     91400   21.3000 -109.3300       7.2        43       103        60
OIR    2025250     91400   21.3000 -109.3400       7.2        43       103        60
OIR    2025250     91400   21.3000 -109.3500       7.1        43       103        60
OIR    2025250     91400   21.3000 -109.3600       7.0        43       103        60
OIR    2025250     91400   21.3000 -109.3700       6.5        43       104        60
OIR    2025250     91400   21.3000 -109.3800       5.7        43       104        60
OIR    2025250     91400   21.3000 -109.3900       5.4        44       104        60
OIR    2025250     91400   21.3000 -109.4000       5.1        44       103        60
OIR    2025250     91400   21.3000 -109.4100       5.0        44       103        60
OIR    2025250     91400   21.3000 -109.4200       4.9        45       103        60
OIR    2025250     91400   21.3000 -109.4300       4.7        45       103        60
OIR    2025250     91400   21.3000 -109.4400       4.5        45       104        60
OIR    2025250     91400   21.3000 -109.4500       4.2        45       105        60
OIR    2025250     91400   21.3000 -109.4600       4.0        45       107        60
OIR    2025250     91400   21.2900 -108.8700       7.5        42       137        60
OIR    2025250     91400   21.2900 -108.8800       7.8        43       129        60
OIR    2025250     91400   21.2900 -108.8900       8.4        45       123        60
OIR    2025250     91400   21.2900 -108.9000       9.1        47       120        60
OIR    2025250     91400   21.2900 -108.9100       9.3        49       116        60
OIR    2025250     91400   21.2900 -108.9200       9.3        50       115        60
OIR    2025250     91400   21.2900 -108.9300       9.2        50       114        60
OIR    2025250     91400   21.2900 -108.9400       9.0        48       112        60
OIR    2025250     91400   21.2900 -108.9500       8.9        47       112        60
OIR    2025250     91400   21.2900 -108.9600       8.7        46       111        60
OIR    2025250     91400   21.2900 -108.9700       8.5        45       110        60
OIR    2025250     91400   21.2900 -108.9800       8.5        44       108        60
OIR    2025250     91400   21.2900 -108.9900       8.5        44       107        60
OIR    2025250     91400   21.2900 -109.0000       8.5        44       105        60
OIR    2025250     91400   21.2900 -109.0100       8.5        44       105        60
OIR    2025250     91400   21.2900 -109.0200       8.5        44       105        60
OIR    2025250     91400   21.2900 -109.0300       8.5        43       104        60
OIR    2025250     91400   21.2900 -109.0400       8.5        43       104        60
OIR    2025250     91400   21.2900 -109.0500       8.4        43       104        60
OIR    2025250     91400   21.2900 -109.0600       8.4        43       104        60
OIR    2025250     91400   21.2900 -109.0700       8.4        43       103        60
OIR    2025250     91400   21.2900 -109.0800       8.4        43       103        60
OIR    2025250     91400   21.2900 -109.0900       8.4        43       103        60
OIR    2025250     91400   21.2900 -109.1000       8.4        43       103        60
OIR    2025250     91400   21.2900 -109.1100       8.4        43       103        60
OIR    2025250     91400   21.2900 -109.1200       8.3        43       104        60
OIR    2025250     91400   21.2900 -109.1300       8.3        43       104        60
OIR    2025250     91400   21.2900 -109.1400       8.3        43       104        60
OIR    2025250     91400   21.2900 -109.1500       8.2        43       104        60
OIR    2025250     91400   21.2900 -109.1600       8.2        43       103        60
OIR    2025250     91400   21.2900 -109.1700       8.2        43       103        60
OIR    2025250     91400   21.2900 -109.1800       8.1        42       103        60
OIR    2025250     91400   21.2900 -109.1900       8.1        42       103        60
OIR    2025250     91400   21.2900 -109.2000       8.0        42       103        60
OIR    2025250     91400   21.2900 -109.2100       8.0        42       103        60
OIR    2025250     91400   21.2900 -109.2200       7.9        42       103        60
OIR    2025250     91400   21.2900 -109.2300       7.9        42       103        60
OIR    2025250     91400   21.2900 -109.2400       7.8        42       103        60
OIR    2025250     91400   21.2900 -109.2500       7.7        42       103        60
OIR    2025250     91400   21.2900 -109.2600       7.7        42       103        60
OIR    2025250     91400   21.2900 -109.2700       7.6        42       103        60
OIR    2025250     91400   21.2900 -109.2800       7.5        42       103        60
OIR    2025250     91400   21.2900 -109.2900       7.5        42       103        60
OIR    2025250     91400   21.2900 -109.3000       7.5        42       103        60
OIR    2025250     91400   21.2900 -109.3100       7.4        42       103        60
OIR    2025250     91400   21.2900 -109.3200       7.4        43       103        60
OIR    2025250     91400   21.2900 -109.3300       7.3        43       103        60
OIR    2025250     91400   21.2900 -109.3400       7.2        43       103        60
OIR    2025250     91400   21.2900 -109.3500       7.1        43       103        60
OIR    2025250     91400   21.2900 -109.3600       7.0        43       103        60
OIR    2025250     91400   21.2900 -109.3700       6.6        43       104        60
OIR    2025250     91400   21.2900 -109.3800       5.7        43       104        60
OIR    2025250     91400   21.2900 -109.3900       5.3        44       104        60
OIR    2025250     91400   21.2900 -109.4000       5.1        44       104        60
OIR    2025250     91400   21.2900 -109.4100       5.0        44       103        60
OIR    2025250     91400   21.2900 -109.4200       4.8        44       103        60
OIR    2025250     91400   21.2900 -109.4300       4.6        44       103        60
OIR    2025250     91400   21.2900 -109.4400       4.4        45       104        60
OIR    2025250     91400   21.2900 -109.4500       4.2        45       105        60
OIR    2025250     91400   21.2800 -108.8700       8.0        40       138        60
OIR    2025250     91400   21.2800 -108.8800       8.4        44       129        60
OIR    2025250     91400   21.2800 -108.8900       9.5        48       121        60
OIR    2025250     91400   21.2800 -108.9000      10.2        51       117        60
OIR    2025250     91400   21.2800 -108.9100      10.3        52       116        60
OIR    2025250     91400   21.2800 -108.9200      10.2        52       114        60
OIR    2025250     91400   21.2800 -108.9300       9.9        51       113        60
OIR    2025250     91400   21.2800 -108.9400       9.7        50       112        60
OIR    2025250     91400   21.2800 -108.9500       9.4        49       111        60
OIR    2025250     91400   21.2800 -108.9600       9.0        46       110        60
OIR    2025250     91400   21.2800 -108.9700       8.7        45       109        60
OIR    2025250     91400   21.2800 -108.9800       8.6        44       108        60
OIR    2025250     91400   21.2800 -108.9900       8.5        44       107        60
OIR    2025250     91400   21.2800 -109.0000       8.5        44       107        60
OIR    2025250     91400   21.2800 -109.0100       8.5        44       105        60
OIR    2025250     91400   21.2800 -109.0200       8.5        44       105        60
OIR    2025250     91400   21.2800 -109.0300       8.5        43       104        60
OIR    2025250     91400   21.2800 -109.0400       8.5        43       104        60
OIR    2025250     91400   21.2800 -109.0500       8.5        43       104        60
OIR    2025250     91400   21.2800 -109.0600       8.5        43       103        60
OIR    2025250     91400   21.2800 -109.0700       8.4        43       103        60
OIR    2025250     91400   21.2800 -109.0800       8.4        43       103        60
OIR    2025250     91400   21.2800 -109.0900       8.4        43       103        60
OIR    2025250     91400   21.2800 -109.1000       8.4        43       103        60
OIR    2025250     91400   21.2800 -109.1100       8.4        43       104        60
OIR    2025250     91400   21.2800 -109.1200       8.4        43       104        60
OIR    2025250     91400   21.2800 -109.1300       8.3        43       104        60
OIR    2025250     91400   21.2800 -109.1400       8.3        43       104        60
OIR    2025250     91400   21.2800 -109.1500       8.3        43       104        60
OIR    2025250     91400   21.2800 -109.1600       8.2        43       103        60
OIR    2025250     91400   21.2800 -109.1700       8.2        42       103        60
OIR    2025250     91400   21.2800 -109.1800       8.1        42       103        60
OIR    2025250     91400   21.2800 -109.1900       8.1        42       103        60
OIR    2025250     91400   21.2800 -109.2000       8.1        42       103        60
OIR    2025250     91400   21.2800 -109.2100       8.0        42       103        60
OIR    2025250     91400   21.2800 -109.2200       8.0        42       103        60
OIR    2025250     91400   21.2800 -109.2300       7.9        42       103        60
OIR    2025250     91400   21.2800 -109.2400       7.9        42       103        60
OIR    2025250     91400   21.2800 -109.2500       7.8        42       103        60
OIR    2025250     91400   21.2800 -109.2600       7.7        42       103        60
OIR    2025250     91400   21.2800 -109.2700       7.6        42       103        60
OIR    2025250     91400   21.2800 -109.2800       7.6        42       103        60
OIR    2025250     91400   21.2800 -109.2900       7.5        42       103        60
OIR    2025250     91400   21.2800 -109.3000       7.5        42       103        60
OIR    2025250     91400   21.2800 -109.3100       7.5        42       103        60
OIR    2025250     91400   21.2800 -109.3200       7.4        42       103        60
OIR    2025250     91400   21.2800 -109.3300       7.3        43       103        60
OIR    2025250     91400   21.2800 -109.3400       7.2        43       103        60
OIR    2025250     91400   21.2800 -109.3500       7.2        43       103        60
OIR    2025250     91400   21.2800 -109.3600       7.1        43       103        60
OIR    2025250     91400   21.2800 -109.3700       6.8        43       104        60
OIR    2025250     91400   21.2800 -109.3800       5.9        43       104        60
OIR    2025250     91400   21.2800 -109.3900       5.3        44       104        60
OIR    2025250     91400   21.2800 -109.4000       5.1        44       104        60
OIR    2025250     91400   21.2800 -109.4100       4.9        44       103        60
OIR    2025250     91400   21.2800 -109.4200       4.8        44       103        60
OIR    2025250     91400   21.2800 -109.4300       4.6        44       103        60
OIR    2025250     91400   21.2800 -109.4400       4.4        44       104        60
OIR    2025250     91400   21.2800 -109.4500       4.1        44       104        60
OIR    2025250     91400   21.2700 -108.8700       8.9        41       137        60
OIR    2025250     91400   21.2700 -108.8800       9.9        47       131        60
OIR    2025250     91400   21.2700 -108.8900      10.9        50       125        60
OIR    2025250     91400   21.2700 -108.9000      11.6        51       120        60
OIR    2025250     91400   21.2700 -108.9100      11.8        51       116        60
OIR    2025250     91400   21.2700 -108.9200      11.8        51       115        60
OIR    2025250     91400   21.2700 -108.9300      11.6        51       114        60
OIR    2025250     91400   21.2700 -108.9400      11.1        51       112        60
OIR    2025250     91400   21.2700 -108.9500      10.4        51       111        60
OIR    2025250     91400   21.2700 -108.9600       9.5        47       109        60
OIR    2025250     91400   21.2700 -108.9700       9.0        45       108        60
OIR    2025250     91400   21.2700 -108.9800       8.7        44       108        60
OIR    2025250     91400   21.2700 -108.9900       8.6        44       107        60
OIR    2025250     91400   21.2700 -109.0000       8.6        44       107        60
OIR    2025250     91400   21.2700 -109.0100       8.5        44       105        60
OIR    2025250     91400   21.2700 -109.0200       8.5        44       105        60
OIR    2025250     91400   21.2700 -109.0300       8.5        43       104        60
OIR    2025250     91400   21.2700 -109.0400       8.5        43       103        60
OIR    2025250     91400   21.2700 -109.0500       8.5        43       103        60
OIR    2025250     91400   21.2700 -109.0600       8.5        43       103        60
OIR    2025250     91400   21.2700 -109.0700       8.5        43       103        60
OIR    2025250     91400   21.2700 -109.0800       8.5        43       103        60
OIR    2025250     91400   21.2700 -109.0900       8.4        43       103        60
OIR    2025250     91400   21.2700 -109.1000       8.4        43       104        60
OIR    2025250     91400   21.2700 -109.1100       8.4        43       104        60
OIR    2025250     91400   21.2700 -109.1200       8.4        43       104        60
OIR    2025250     91400   21.2700 -109.1300       8.4        43       104        60
OIR    2025250     91400   21.2700 -109.1400       8.3        43       103        60
OIR    2025250     91400   21.2700 -109.1500       8.3        43       103        60
OIR    2025250     91400   21.2700 -109.1600       8.3        42       103        60
OIR    2025250     91400   21.2700 -109.1700       8.2        42       103        60
OIR    2025250     91400   21.2700 -109.1800       8.2        42       103        60
OIR    2025250     91400   21.2700 -109.1900       8.1        42       103        60
OIR    2025250     91400   21.2700 -109.2000       8.1        42       103        60
OIR    2025250     91400   21.2700 -109.2100       8.0        42       103        60
OIR    2025250     91400   21.2700 -109.2200       8.0        42       103        60
OIR    2025250     91400   21.2700 -109.2300       8.0        42       103        60
OIR    2025250     91400   21.2700 -109.2400       7.9        42       103        60
OIR    2025250     91400   21.2700 -109.2500       7.9        42       103        60
OIR    2025250     91400   21.2700 -109.2600       7.8        42       103        60
OIR    2025250     91400   21.2700 -109.2700       7.7        42       103        60
OIR    2025250     91400   21.2700 -109.2800       7.6        42       103        60
OIR    2025250     91400   21.2700 -109.2900       7.6        42       103        60
OIR    2025250     91400   21.2700 -109.3000       7.5        42       103        60
OIR    2025250     91400   21.2700 -109.3100       7.5        42       103        60
OIR    2025250     91400   21.2700 -109.3200       7.4        42       103        60
OIR    2025250     91400   21.2700 -109.3300       7.4        42       103        60
OIR    2025250     91400   21.2700 -109.3400       7.3        43       103        60
OIR    2025250     91400   21.2700 -109.3500       7.2        43       103        60
OIR    2025250     91400   21.2700 -109.3600       7.1        43       103        60
OIR    2025250     91400   21.2700 -109.3700       6.9        43       103        60
OIR    2025250     91400   21.2700 -109.3800       6.1        44       104        60
OIR    2025250     91400   21.2700 -109.3900       5.4        44       104        60
OIR    2025250     91400   21.2700 -109.4000       5.1        44       104        60
OIR    2025250     91400   21.2700 -109.4100       4.9        44       104        60
OIR    2025250     91400   21.2700 -109.4200       4.7        44       104        60
OIR    2025250     91400   21.2700 -109.4300       4.6        43       104        60
OIR    2025250     91400   21.2700 -109.4400       4.4        43       104        60
OIR    2025250     91400   21.2700 -109.4500       4.1        43       104        60
OIR    2025250     91400   21.2600 -108.8700      10.7        44       134        60
OIR    2025250     91400   21.2600 -108.8800      11.9        47       132        60
OIR    2025250     91400   21.2600 -108.8900      12.8        48       130        60
OIR    2025250     91400   21.2600 -108.9000      13.4        48       128        60
OIR    2025250     91400   21.2600 -108.9100      13.6        48       123        60
OIR    2025250     91400   21.2600 -108.9200      13.8        48       119        60
OIR    2025250     91400   21.2600 -108.9300      13.6        48       116        60
OIR    2025250     91400   21.2600 -108.9400      13.3        49       113        60
OIR    2025250     91400   21.2600 -108.9500      12.9        47       110        60
OIR    2025250     91400   21.2600 -108.9600      11.7        46       108        60
OIR    2025250     91400   21.2600 -108.9700       9.8        45       105        60
OIR    2025250     91400   21.2600 -108.9800       9.1        45       105        60
OIR    2025250     91400   21.2600 -108.9900       8.8        44       105        60
OIR    2025250     91400   21.2600 -109.0000       8.6        44       105        60
OIR    2025250     91400   21.2600 -109.0100       8.6        44       105        60
OIR    2025250     91400   21.2600 -109.0200       8.6        44       105        60
OIR    2025250     91400   21.2600 -109.0300       8.6        43       105        60
OIR    2025250     91400   21.2600 -109.0400       8.5        43       104        60
OIR    2025250     91400   21.2600 -109.0500       8.5        43       104        60
OIR    2025250     91400   21.2600 -109.0600       8.5        43       104        60
OIR    2025250     91400   21.2600 -109.0700       8.5        43       104        60
OIR    2025250     91400   21.2600 -109.0800       8.5        43       104        60
OIR    2025250     91400   21.2600 -109.0900       8.5        43       104        60
OIR    2025250     91400   21.2600 -109.1000       8.4        43       104        60
OIR    2025250     91400   21.2600 -109.1100       8.4        43       104        60
OIR    2025250     91400   21.2600 -109.1200       8.4        43       104        60
OIR    2025250     91400   21.2600 -109.1300       8.4        43       104        60
OIR    2025250     91400   21.2600 -109.1400       8.3        43       104        60
OIR    2025250     91400   21.2600 -109.1500       8.3        42       103        60
OIR    2025250     91400   21.2600 -109.1600       8.3        42       103        60
OIR    2025250     91400   21.2600 -109.1700       8.2        42       103        60
OIR    2025250     91400   21.2600 -109.1800       8.2        42       103        60
OIR    2025250     91400   21.2600 -109.1900       8.2        42       103        60
OIR    2025250     91400   21.2600 -109.2000       8.1        42       103        60
OIR    2025250     91400   21.2600 -109.2100       8.1        42       103        60
OIR    2025250     91400   21.2600 -109.2200       8.0        42       103        60
OIR    2025250     91400   21.2600 -109.2300       8.0        42       103        60
OIR    2025250     91400   21.2600 -109.2400       8.0        42       103        60
OIR    2025250     91400   21.2600 -109.2500       7.9        42       103        60
OIR    2025250     91400   21.2600 -109.2600       7.8        42       103        60
OIR    2025250     91400   21.2600 -109.2700       7.8        42       103        60
OIR    2025250     91400   21.2600 -109.2800       7.7        42       103        60
OIR    2025250     91400   21.2600 -109.2900       7.6        42       103        60
OIR    2025250     91400   21.2600 -109.3000       7.6        42       103        60
OIR    2025250     91400   21.2600 -109.3100       7.5        42       103        60
OIR    2025250     91400   21.2600 -109.3200       7.5        42       103        60
OIR    2025250     91400   21.2600 -109.3300       7.4        42       103        60
OIR    2025250     91400   21.2600 -109.3400       7.3        42       103        60
OIR    2025250     91400   21.2600 -109.3500       7.2        42       103        60
OIR    2025250     91400   21.2600 -109.3600       7.1        42       103        60
OIR    2025250     91400   21.2600 -109.3700       7.0        42       103        60
OIR    2025250     91400   21.2600 -109.3800       6.5        43       103        60
OIR    2025250     91400   21.2600 -109.3900       5.5        43       103        60
OIR    2025250     91400   21.2600 -109.4000       5.1        43       104        60
OIR    2025250     91400   21.2600 -109.4100       4.9        43       104        60
OIR    2025250     91400   21.2600 -109.4200       4.7        43       104        60
OIR    2025250     91400   21.2600 -109.4300       4.6        43       104        60
OIR    2025250     91400   21.2600 -109.4400       4.3        42       105        60
OIR    2025250     91400   21.2600 -109.4500       4.1        42       105        60
OIR    2025250     91400   21.2500 -108.8700      12.5        42       137        60
OIR    2025250     91400   21.2500 -108.8800      13.1        46       134        60
OIR    2025250     91400   21.2500 -108.8900      13.7        47       134        60
OIR    2025250     91400   21.2500 -108.9000      13.9        47       135        60
OIR    2025250     91400   21.2500 -108.9100      14.0        47       129        60
OIR    2025250     91400   21.2500 -108.9200      14.1        46       123        60
OIR    2025250     91400   21.2500 -108.9300      14.1        47       117        60
OIR    2025250     91400   21.2500 -108.9400      14.0        47       114        60
OIR    2025250     91400   21.2500 -108.9500      13.9        46       110        60
OIR    2025250     91400   21.2500 -108.9600      13.6        46       107        60
OIR    2025250     91400   21.2500 -108.9700      12.1        45       104        60
OIR    2025250     91400   21.2500 -108.9800      10.3        46       104        60
OIR    2025250     91400   21.2500 -108.9900       9.4        46       104        60
OIR    2025250     91400   21.2500 -109.0000       8.9        45       104        60
OIR    2025250     91400   21.2500 -109.0100       8.6        44       104        60
OIR    2025250     91400   21.2500 -109.0200       8.6        44       105        60
OIR    2025250     91400   21.2500 -109.0300       8.6        43       105        60
OIR    2025250     91400   21.2500 -109.0400       8.6        43       105        60
OIR    2025250     91400   21.2500 -109.0500       8.6        43       105        60
OIR    2025250     91400   21.2500 -109.0600       8.5        43       105        60
OIR    2025250     91400   21.2500 -109.0700       8.5        43       105        60
OIR    2025250     91400   21.2500 -109.0800       8.5        43       104        60
OIR    2025250     91400   21.2500 -109.0900       8.5        43       104        60
OIR    2025250     91400   21.2500 -109.1000       8.5        43       104        60
OIR    2025250     91400   21.2500 -109.1100       8.4        43       104        60
OIR    2025250     91400   21.2500 -109.1200       8.4        43       104        60
OIR    2025250     91400   21.2500 -109.1300       8.4        42       104        60
OIR    2025250     91400   21.2500 -109.1400       8.4        42       104        60
OIR    2025250     91400   21.2500 -109.1500       8.3        42       104        60
OIR    2025250     91400   21.2500 -109.1600       8.3        42       104        60
OIR    2025250     91400   21.2500 -109.1700       8.3        42       104        60
OIR    2025250     91400   21.2500 -109.1800       8.2        42       104        60
OIR    2025250     91400   21.2500 -109.1900       8.2        42       104        60
OIR    2025250     91400   21.2500 -109.2000       8.1        42       104        60
OIR    2025250     91400   21.2500 -109.2100       8.1        42       104        60
OIR    2025250     91400   21.2500 -109.2200       8.1        42       103        60
OIR    2025250     91400   21.2500 -109.2300       8.0        41       103        60
OIR    2025250     91400   21.2500 -109.2400       8.0        41       103        60
OIR    2025250     91400   21.2500 -109.2500       7.9        41       103        60
OIR    2025250     91400   21.2500 -109.2600       7.9        41       103        60
OIR    2025250     91400   21.2500 -109.2700       7.8        41       103        60
OIR    2025250     91400   21.2500 -109.2800       7.7        41       103        60
OIR    2025250     91400   21.2500 -109.2900       7.6        42       103        60
OIR    2025250     91400   21.2500 -109.3000       7.6        42       103        60
OIR    2025250     91400   21.2500 -109.3100       7.5        42       103        60
OIR    2025250     91400   21.2500 -109.3200       7.5        42       103        60
OIR    2025250     91400   21.2500 -109.3300       7.4        42       103        60
OIR    2025250     91400   21.2500 -109.3400       7.3        42       103        60
OIR    2025250     91400   21.2500 -109.3500       7.2        42       103        60
OIR    2025250     91400   21.2500 -109.3600       7.1        42       103        60
OIR    2025250     91400   21.2500 -109.3700       7.0        42       104        60
OIR    2025250     91400   21.2500 -109.3800       6.7        42       104        60
OIR    2025250     91400   21.2500 -109.3900       5.8        42       104        60
OIR    2025250     91400   21.2500 -109.4000       5.2        42       104        60
OIR    2025250     91400   21.2500 -109.4100       4.9        42       104        60
OIR    2025250     91400   21.2500 -109.4200       4.7        42       105        60
OIR    2025250     91400   21.2500 -109.4300       4.5        42       105        60
OIR    2025250     91400   21.2500 -109.4400       4.3        42       107        60
OIR    2025250     91400   21.2500 -109.4500       4.0        42       108        60
OIR    2025250     91400   21.2400 -108.9100      14.1        46       133        60
OIR    2025250     91400   21.2400 -108.9200      14.1        46       124        60
OIR    2025250     91400   21.2400 -108.9300      14.1        46       117        60
OIR    2025250     91400   21.2400 -108.9400      14.1        46       115        60
OIR    2025250     91400   21.2400 -108.9500      14.1        46       112        60
OIR    2025250     91400   21.2400 -108.9600      14.1        46       110        60
OIR    2025250     91400   21.2400 -108.9700      13.8        47       108        60
OIR    2025250     91400   21.2400 -108.9800      12.5        47       107        60
OIR    2025250     91400   21.2400 -108.9900      10.9        47       107        60
OIR    2025250     91400   21.2400 -109.0000       9.6        46       105        60
OIR    2025250     91400   21.2400 -109.0100       8.9        44       105        60
OIR    2025250     91400   21.2400 -109.0200       8.7        44       107        60
OIR    2025250     91400   21.2400 -109.0300       8.6        43       107        60
OIR    2025250     91400   21.2400 -109.0400       8.6        43       107        60
OIR    2025250     91400   21.2400 -109.0500       8.6        43       107        60
OIR    2025250     91400   21.2400 -109.0600       8.6        43       105        60
OIR    2025250     91400   21.2400 -109.0700       8.6        43       104        60
OIR    2025250     91400   21.2400 -109.0800       8.5        43       104        60
OIR    2025250     91400   21.2400 -109.0900       8.5        43       104        60
OIR    2025250     91400   21.2400 -109.1000       8.5        43       105        60
OIR    2025250     91400   21.2400 -109.1100       8.5        42       104        60
OIR    2025250     91400   21.2400 -109.1200       8.5        42       104        60
OIR    2025250     91400   21.2400 -109.1300       8.4        42       104        60
OIR    2025250     91400   21.2400 -109.1400       8.4        42       104        60
OIR    2025250     91400   21.2400 -109.1500       8.4        42       104        60
OIR    2025250     91400   21.2400 -109.1600       8.3        42       104        60
OIR    2025250     91400   21.2400 -109.1700       8.3        42       104        60
OIR    2025250     91400   21.2400 -109.1800       8.3        42       104        60
OIR    2025250     91400   21.2400 -109.1900       8.2        42       104        60
OIR    2025250     91400   21.2400 -109.2000       8.2        42       104        60
OIR    2025250     91400   21.2400 -109.2100       8.1        41       104        60
OIR    2025250     91400   21.2400 -109.2200       8.1        41       104        60
OIR    2025250     91400   21.2400 -109.2300       8.1        41       103        60
OIR    2025250     91400   21.2400 -109.2400       8.0        41       103        60
OIR    2025250     91400   21.2400 -109.2500       8.0        41       103        60
OIR    2025250     91400   21.2400 -109.2600       7.9        41       103        60
OIR    2025250     91400   21.2400 -109.2700       7.9        41       103        60
OIR    2025250     91400   21.2400 -109.2800       7.8        41       103        60
OIR    2025250     91400   21.2400 -109.2900       7.7        41       103        60
OIR    2025250     91400   21.2400 -109.3000       7.6        41       103        60
OIR    2025250     91400   21.2400 -109.3100       7.5        41       103        60
OIR    2025250     91400   21.2400 -109.3200       7.5        41       103        60
OIR    2025250     91400   21.2400 -109.3300       7.4        41       103        60
OIR    2025250     91400   21.2400 -109.3400       7.3        41       103        60
OIR    2025250     91400   21.2400 -109.3500       7.2        41       103        60
OIR    2025250     91400   21.2400 -109.3600       7.1        41       104        60
OIR    2025250     91400   21.2400 -109.3700       7.0        42       104        60
OIR    2025250     91400   21.2400 -109.3800       6.8        41       104        60
OIR    2025250     91400   21.2400 -109.3900       6.0        41       105        60
OIR    2025250     91400   21.2400 -109.4000       5.3        40       105        60
OIR    2025250     91400   21.2400 -109.4100       4.9        41       107        60
OIR    2025250     91400   21.2400 -109.4200       4.7        41       107        60
OIR    2025250     91400   21.2400 -109.4300       4.4        41       108        60
OIR    2025250     91400   21.2400 -109.4400       4.2        41       109        60
OIR    2025250     91400   21.2400 -109.4500       4.0        40       109        60
OIR    2025250     91400   21.2300 -108.9100      14.1        46       139        60
OIR    2025250     91400   21.2300 -108.9200      14.1        46       128        60
OIR    2025250     91400   21.2300 -108.9300      14.1        46       117        60
OIR    2025250     91400   21.2300 -108.9400      14.1        46       115        60
OIR    2025250     91400   21.2300 -108.9500      14.1        46       113        60
OIR    2025250     91400   21.2300 -108.9600      14.1        46       111        60
OIR    2025250     91400   21.2300 -108.9700      14.1        47       110        60
OIR    2025250     91400   21.2300 -108.9800      13.8        47       109        60
OIR    2025250     91400   21.2300 -108.9900      12.7        47       109        60
OIR    2025250     91400   21.2300 -109.0000      10.9        46       108        60
OIR    2025250     91400   21.2300 -109.0100       9.5        44       108        60
OIR    2025250     91400   21.2300 -109.0200       8.9        44       107        60
OIR    2025250     91400   21.2300 -109.0300       8.7        43       107        60
OIR    2025250     91400   21.2300 -109.0400       8.7        43       107        60
OIR    2025250     91400   21.2300 -109.0500       8.7        43       107        60
OIR    2025250     91400   21.2300 -109.0600       8.6        43       105        60
OIR    2025250     91400   21.2300 -109.0700       8.6        43       104        60
OIR    2025250     91400   21.2300 -109.0800       8.6        43       104        60
OIR    2025250     91400   21.2300 -109.0900       8.6        42       104        60
OIR    2025250     91400   21.2300 -109.1000       8.5        42       104        60
OIR    2025250     91400   21.2300 -109.1100       8.5        42       104        60
OIR    2025250     91400   21.2300 -109.1200       8.5        42       105        60
OIR    2025250     91400   21.2300 -109.1300       8.5        42       105        60
OIR    2025250     91400   21.2300 -109.1400       8.4        42       105        60
OIR    2025250     91400   21.2300 -109.1500       8.4        42       105        60
OIR    2025250     91400   21.2300 -109.1600       8.4        42       105        60
OIR    2025250     91400   21.2300 -109.1700       8.3        42       104        60
OIR    2025250     91400   21.2300 -109.1800       8.3        42       104        60
OIR    2025250     91400   21.2300 -109.1900       8.3        41       104        60
OIR    2025250     91400   21.2300 -109.2000       8.2        41       105        60
OIR    2025250     91400   21.2300 -109.2100       8.2        41       105        60
OIR    2025250     91400   21.2300 -109.2200       8.1        41       104        60
OIR    2025250     91400   21.2300 -109.2300       8.1        41       104        60
OIR    2025250     91400   21.2300 -109.2400       8.1        41       104        60
OIR    2025250     91400   21.2300 -109.2500       8.0        41       104        60
OIR    2025250     91400   21.2300 -109.2600       8.0        41       104        60
OIR    2025250     91400   21.2300 -109.2700       7.9        41       103        60
OIR    2025250     91400   21.2300 -109.2800       7.8        41       103        60
OIR    2025250     91400   21.2300 -109.2900       7.7        41       103        60
OIR    2025250     91400   21.2300 -109.3000       7.6        41       103        60
OIR    2025250     91400   21.2300 -109.3100       7.6        41       103        60
OIR    2025250     91400   21.2300 -109.3200       7.5        41       103        60
OIR    2025250     91400   21.2300 -109.3300       7.4        41       103        60
OIR    2025250     91400   21.2300 -109.3400       7.3        41       103        60
OIR    2025250     91400   21.2300 -109.3500       7.2        41       103        60
OIR    2025250     91400   21.2300 -109.3600       7.1        41       104        60
OIR    2025250     91400   21.2300 -109.3700       7.0        41       104        60
OIR    2025250     91400   21.2300 -109.3800       6.8        41       104        60
OIR    2025250     91400   21.2300 -109.3900       6.2        40       105        60
OIR    2025250     91400   21.2300 -109.4000       5.4        39       107        60
OIR    2025250     91400   21.2300 -109.4100       4.9        39       108        60
OIR    2025250     91400   21.2300 -109.4200       4.6        40       108        60
OIR    2025250     91400   21.2300 -109.4300       4.3        40       109        60
OIR    2025250     91400   21.2300 -109.4400       4.1        39       110        60
OIR    2025250     91400   21.2200 -108.9200      14.1        46       135        60
OIR    2025250     91400   21.2200 -108.9300      14.1        46       125        60
OIR    2025250     91400   21.2200 -108.9400      14.1        46       119        60
OIR    2025250     91400   21.2200 -108.9500      14.1        46       115        60
OIR    2025250     91400   21.2200 -108.9600      14.1        46       111        60
OIR    2025250     91400   21.2200 -108.9700      14.1        46       111        60
OIR    2025250     91400   21.2200 -108.9800      14.0        47       110        60
OIR    2025250     91400   21.2200 -108.9900      13.5        47       109        60
OIR    2025250     91400   21.2200 -109.0000      12.0        46       108        60
OIR    2025250     91400   21.2200 -109.0100      10.4        45       107        60
OIR    2025250     91400   21.2200 -109.0200       9.5        44       107        60
OIR    2025250     91400   21.2200 -109.0300       8.9        43       107        60
OIR    2025250     91400   21.2200 -109.0400       8.8        43       107        60
OIR    2025250     91400   21.2200 -109.0500       8.7        43       107        60
OIR    2025250     91400   21.2200 -109.0600       8.7        43       105        60
OIR    2025250     91400   21.2200 -109.0700       8.7        43       104        60
OIR    2025250     91400   21.2200 -109.0800       8.6        42       104        60
OIR    2025250     91400   21.2200 -109.0900       8.6        42       104        60
OIR    2025250     91400   21.2200 -109.1000       8.6        42       104        60
OIR    2025250     91400   21.2200 -109.1100       8.6        42       104        60
OIR    2025250     91400   21.2200 -109.1200       8.6        42       104        60
OIR    2025250     91400   21.2200 -109.1300       8.5        42       105        60
OIR    2025250     91400   21.2200 -109.1400       8.5        42       105        60
OIR    2025250     91400   21.2200 -109.1500       8.5        41       105        60
OIR    2025250     91400   21.2200 -109.1600       8.4        41       105        60
OIR    2025250     91400   21.2200 -109.1700       8.4        41       105        60
OIR    2025250     91400   21.2200 -109.1800       8.4        41       105        60
OIR    2025250     91400   21.2200 -109.1900       8.3        41       105        60
OIR    2025250     91400   21.2200 -109.2000       8.3        41       105        60
OIR    2025250     91400   21.2200 -109.2100       8.2        41       105        60
OIR    2025250     91400   21.2200 -109.2200       8.2        41       107        60
OIR    2025250     91400   21.2200 -109.2300       8.1        41       107        60
OIR    2025250     91400   21.2200 -109.2400       8.1        41       107        60
OIR    2025250     91400   21.2200 -109.2500       8.0        41       105        60
OIR    2025250     91400   21.2200 -109.2600       8.0        40       104        60
OIR    2025250     91400   21.2200 -109.2700       7.9        40       104        60
OIR    2025250     91400   21.2200 -109.2800       7.9        40       103        60
OIR    2025250     91400   21.2200 -109.2900       7.8        41       103        60
OIR    2025250     91400   21.2200 -109.3000       7.7        41       103        60
OIR    2025250     91400   21.2200 -109.3100       7.6        41       103        60
OIR    2025250     91400   21.2200 -109.3200       7.5        41       103        60
OIR    2025250     91400   21.2200 -109.3300       7.4        40       103        60
OIR    2025250     91400   21.2200 -109.3400       7.4        40       103        60
OIR    2025250     91400   21.2200 -109.3500       7.3        41       103        60
OIR    2025250     91400   21.2200 -109.3600       7.1        41       104        60
OIR    2025250     91400   21.2200 -109.3700       7.0        40       104        60
OIR    2025250     91400   21.2200 -109.3800       6.8        40       104        60
OIR    2025250     91400   21.2200 -109.3900       6.3        39       105        60
OIR    2025250     91400   21.2200 -109.4000       5.5        38       107        60
OIR    2025250     91400   21.2200 -109.4100       4.8        38       108        60
OIR    2025250     91400   21.2200 -109.4200       4.4        38       108        60
OIR    2025250     91400   21.2200 -109.4300       4.1        38       109        60
OIR    2025250     91400   21.2100 -108.9200      14.1        46       141        60
OIR    2025250     91400   21.2100 -108.9300      14.1        46       132        60
OIR    2025250     91400   21.2100 -108.9400      14.1        46       125        60
OIR    2025250     91400   21.2100 -108.9500      14.1        46       117        60
OIR    2025250     91400   21.2100 -108.9600      14.1        46       111        60
OIR    2025250     91400   21.2100 -108.9700      14.1        46       111        60
OIR    2025250     91400   21.2100 -108.9800      14.0        46       110        60
OIR    2025250     91400   21.2100 -108.9900      13.7        46       109        60
OIR    2025250     91400   21.2100 -109.0000      12.8        46       107        60
OIR    2025250     91400   21.2100 -109.0100      11.2        44       104        60
OIR    2025250     91400   21.2100 -109.0200      10.1        43       105        60
OIR    2025250     91400   21.2100 -109.0300       9.4        43       107        60
OIR    2025250     91400   21.2100 -109.0400       9.0        43       107        60
OIR    2025250     91400   21.2100 -109.0500       8.8        43       105        60
OIR    2025250     91400   21.2100 -109.0600       8.8        42       105        60
OIR    2025250     91400   21.2100 -109.0700       8.7        42       105        60
OIR    2025250     91400   21.2100 -109.0800       8.7        42       105        60
OIR    2025250     91400   21.2100 -109.0900       8.7        42       104        60
OIR    2025250     91400   21.2100 -109.1000       8.6        42       104        60
OIR    2025250     91400   21.2100 -109.1100       8.6        42       104        60
OIR    2025250     91400   21.2100 -109.1200       8.6        42       104        60
OIR    2025250     91400   21.2100 -109.1300       8.6        42       105        60
OIR    2025250     91400   21.2100 -109.1400       8.5        41       105        60
OIR    2025250     91400   21.2100 -109.1500       8.5        41       105        60
OIR    2025250     91400   21.2100 -109.1600       8.5        41       105        60
OIR    2025250     91400   21.2100 -109.1700       8.5        41       105        60
OIR    2025250     91400   21.2100 -109.1800       8.4        41       105        60
OIR    2025250     91400   21.2100 -109.1900       8.4        41       105        60
OIR    2025250     91400   21.2100 -109.2000       8.3        41       105        60
OIR    2025250     91400   21.2100 -109.2100       8.3        41       107        60
OIR    2025250     91400   21.2100 -109.2200       8.2        41       107        60
OIR    2025250     91400   21.2100 -109.2300       8.2        40       107        60
OIR    2025250     91400   21.2100 -109.2400       8.1        40       105        60
OIR    2025250     91400   21.2100 -109.2500       8.1        40       105        60
OIR    2025250     91400   21.2100 -109.2600       8.0        40       104        60
OIR    2025250     91400   21.2100 -109.2700       8.0        40       104        60
OIR    2025250     91400   21.2100 -109.2800       7.9        40       103        60
OIR    2025250     91400   21.2100 -109.2900       7.8        40       103        60
OIR    2025250     91400   21.2100 -109.3000       7.7        40       103        60
OIR    2025250     91400   21.2100 -109.3100       7.6        40       103        60
OIR    2025250     91400   21.2100 -109.3200       7.5        40       103        60
OIR    2025250     91400   21.2100 -109.3300       7.5        40       103        60
OIR    2025250     91400   21.2100 -109.3400       7.4        40       103        60
OIR    2025250     91400   21.2100 -109.3500       7.3        40       104        60
OIR    2025250     91400   21.2100 -109.3600       7.1        40       104        60
OIR    2025250     91400   21.2100 -109.3700       7.0        40       104        60
OIR    2025250     91400   21.2100 -109.3800       6.8        39       104        60
OIR    2025250     91400   21.2100 -109.3900       6.3        39       105        60
OIR    2025250     91400   21.2100 -109.4000       5.6        38       107        60
OIR    2025250     91400   21.2100 -109.4100       4.7        37       108        60
OIR    2025250     91400   21.2100 -109.4200       4.2        37       109        60
OIR    2025250     91400   21.2100 -109.4300       4.0        37       109        60
OIR    2025250     91400   21.2000 -108.9300      14.1        46       136        60
OIR    2025250     91400   21.2000 -108.9400      14.1        46       128        60
OIR    2025250     91400   21.2000 -108.9500      14.1        46       122        60
OIR    2025250     91400   21.2000 -108.9600      14.1        46       115        60
OIR    2025250     91400   21.2000 -108.9700      14.1        46       113        60
OIR    2025250     91400   21.2000 -108.9800      13.9        46       112        60
OIR    2025250     91400   21.2000 -108.9900      13.7        45       110        60
OIR    2025250     91400   21.2000 -109.0000      13.4        45       108        60
OIR    2025250     91400   21.2000 -109.0100      12.3        44       105        60
OIR    2025250     91400   21.2000 -109.0200      10.9        43       105        60
OIR    2025250     91400   21.2000 -109.0300       9.8        43       105        60
OIR    2025250     91400   21.2000 -109.0400       9.2        42       105        60
OIR    2025250     91400   21.2000 -109.0500       9.0        42       105        60
OIR    2025250     91400   21.2000 -109.0600       8.8        42       104        60
OIR    2025250     91400   21.2000 -109.0700       8.8        42       105        60
OIR    2025250     91400   21.2000 -109.0800       8.7        42       105        60
OIR    2025250     91400   21.2000 -109.0900       8.7        42       105        60
OIR    2025250     91400   21.2000 -109.1000       8.7        42       105        60
OIR    2025250     91400   21.2000 -109.1100       8.7        42       105        60
OIR    2025250     91400   21.2000 -109.1200       8.6        42       104        60
OIR    2025250     91400   21.2000 -109.1300       8.6        41       105        60
OIR    2025250     91400   21.2000 -109.1400       8.6        41       105        60
OIR    2025250     91400   21.2000 -109.1500       8.5        41       105        60
OIR    2025250     91400   21.2000 -109.1600       8.5        41       105        60
OIR    2025250     91400   21.2000 -109.1700       8.5        41       105        60
OIR    2025250     91400   21.2000 -109.1800       8.5        41       105        60
OIR    2025250     91400   21.2000 -109.1900       8.4        41       107        60
OIR    2025250     91400   21.2000 -109.2000       8.4        40       107        60
OIR    2025250     91400   21.2000 -109.2100       8.3        40       107        60
OIR    2025250     91400   21.2000 -109.2200       8.3        40       107        60
OIR    2025250     91400   21.2000 -109.2300       8.2        40       105        60
OIR    2025250     91400   21.2000 -109.2400       8.2        40       105        60
OIR    2025250     91400   21.2000 -109.2500       8.1        40       104        60
OIR    2025250     91400   21.2000 -109.2600       8.0        40       104        60
OIR    2025250     91400   21.2000 -109.2700       8.0        40       104        60
OIR    2025250     91400   21.2000 -109.2800       7.9        40       103        60
OIR    2025250     91400   21.2000 -109.2900       7.8        40       103        60
OIR    2025250     91400   21.2000 -109.3000       7.8        40       103        60
OIR    2025250     91400   21.2000 -109.3100       7.7        40       103        60
OIR    2025250     91400   21.2000 -109.3200       7.6        40       103        60
OIR    2025250     91400   21.2000 -109.3300       7.5        39       103        60
OIR    2025250     91400   21.2000 -109.3400       7.4        39       103        60
OIR    2025250     91400   21.2000 -109.3500       7.3        39       104        60
OIR    2025250     91400   21.2000 -109.3600       7.2        39       104        60
OIR    2025250     91400   21.2000 -109.3700       7.0        39       104        60
OIR    2025250     91400   21.2000 -109.3800       6.8        39       104        60
OIR    2025250     91400   21.2000 -109.3900       6.4        38       105        60
OIR    2025250     91400   21.2000 -109.4000       5.6        37       107        60
OIR    2025250     91400   21.2000 -109.4100       4.4        36       108        60
OIR    2025250     91400   21.2000 -109.4200       4.0        36       109        60
OIR    2025250     91400   21.1900 -108.9300      14.1        46       140        60
OIR    2025250     91400   21.1900 -108.9400      14.1        46       132        60
OIR    2025250     91400   21.1900 -108.9500      14.1        46       126        60
OIR    2025250     91400   21.1900 -108.9600      14.0        46       120        60
OIR    2025250     91400   21.1900 -108.9700      14.0        46       115        60
OIR    2025250     91400   21.1900 -108.9800      13.8        45       113        60
OIR    2025250     91400   21.1900 -108.9900      13.7        45       112        60
OIR    2025250     91400   21.1900 -109.0000      13.6        44       109        60
OIR    2025250     91400   21.1900 -109.0100      13.3        44       107        60
OIR    2025250     91400   21.1900 -109.0200      12.5        44       105        60
OIR    2025250     91400   21.1900 -109.0300      10.6        43       105        60
OIR    2025250     91400   21.1900 -109.0400       9.6        42       105        60
OIR    2025250     91400   21.1900 -109.0500       9.1        42       105        60
OIR    2025250     91400   21.1900 -109.0600       9.0        42       104        60
OIR    2025250     91400   21.1900 -109.0700       8.9        42       104        60
OIR    2025250     91400   21.1900 -109.0800       8.8        42       105        60
OIR    2025250     91400   21.1900 -109.0900       8.8        42       105        60
OIR    2025250     91400   21.1900 -109.1000       8.7        42       107        60
OIR    2025250     91400   21.1900 -109.1100       8.7        42       107        60
OIR    2025250     91400   21.1900 -109.1200       8.7        41       107        60
OIR    2025250     91400   21.1900 -109.1300       8.6        41       105        60
OIR    2025250     91400   21.1900 -109.1400       8.6        41       105        60
OIR    2025250     91400   21.1900 -109.1500       8.6        41       105        60
OIR    2025250     91400   21.1900 -109.1600       8.6        41       105        60
OIR    2025250     91400   21.1900 -109.1700       8.5        41       105        60
OIR    2025250     91400   21.1900 -109.1800       8.5        40       107        60
OIR    2025250     91400   21.1900 -109.1900       8.5        40       108        60
OIR    2025250     91400   21.1900 -109.2000       8.4        40       108        60
OIR    2025250     91400   21.1900 -109.2100       8.4        40       108        60
OIR    2025250     91400   21.1900 -109.2200       8.3        40       107        60
OIR    2025250     91400   21.1900 -109.2300       8.3        40       107        60
OIR    2025250     91400   21.1900 -109.2400       8.2        40       105        60
OIR    2025250     91400   21.1900 -109.2500       8.2        39       104        60
OIR    2025250     91400   21.1900 -109.2600       8.1        39       104        60
OIR    2025250     91400   21.1900 -109.2700       8.0        39       104        60
OIR    2025250     91400   21.1900 -109.2800       7.9        39       103        60
OIR    2025250     91400   21.1900 -109.2900       7.9        39       103        60
OIR    2025250     91400   21.1900 -109.3000       7.8        39       103        60
OIR    2025250     91400   21.1900 -109.3100       7.7        39       103        60
OIR    2025250     91400   21.1900 -109.3200       7.6        39       103        60
OIR    2025250     91400   21.1900 -109.3300       7.5        39       104        60
OIR    2025250     91400   21.1900 -109.3400       7.4        39       104        60
OIR    2025250     91400   21.1900 -109.3500       7.3        39       104        60
OIR    2025250     91400   21.1900 -109.3600       7.2        39       104        60
OIR    2025250     91400   21.1900 -109.3700       7.0        39       104        60
OIR    2025250     91400   21.1900 -109.3800       6.8        38       105        60
OIR    2025250     91400   21.1900 -109.3900       6.3        38       105        60
OIR    2025250     91400   21.1900 -109.4000       5.4        37       107        60
OIR    2025250     91400   21.1900 -109.4100       4.2        35       107        60
OIR    2025250     91400   21.1900 -109.4200       4.0        36       109        60
OIR    2025250     91400   21.1800 -108.9300      14.0        46       140        60
OIR    2025250     91400   21.1800 -108.9400      14.0        46       135        60
OIR    2025250     91400   21.1800 -108.9500      13.8        46       129        60
OIR    2025250     91400   21.1800 -108.9600      13.8        45       123        60
OIR    2025250     91400   21.1800 -108.9700      13.8        45       116        60
OIR    2025250     91400   21.1800 -108.9800      13.7        44       115        60
OIR    2025250     91400   21.1800 -108.9900      13.6        44       113        60
OIR    2025250     91400   21.1800 -109.0000      13.6        44       111        60
OIR    2025250     91400   21.1800 -109.0100      13.5        44       109        60
OIR    2025250     91400   21.1800 -109.0200      13.2        44       107        60
OIR    2025250     91400   21.1800 -109.0300      12.1        43       108        60
OIR    2025250     91400   21.1800 -109.0400      10.4        42       108        60
OIR    2025250     91400   21.1800 -109.0500       9.4        42       107        60
OIR    2025250     91400   21.1800 -109.0600       9.1        42       107        60
OIR    2025250     91400   21.1800 -109.0700       9.0        42       105        60
OIR    2025250     91400   21.1800 -109.0800       8.9        42       107        60
OIR    2025250     91400   21.1800 -109.0900       8.8        42       107        60
OIR    2025250     91400   21.1800 -109.1000       8.8        42       108        60
OIR    2025250     91400   21.1800 -109.1100       8.7        41       108        60
OIR    2025250     91400   21.1800 -109.1200       8.7        41       108        60
OIR    2025250     91400   21.1800 -109.1300       8.7        41       107        60
OIR    2025250     91400   21.1800 -109.1400       8.6        41       105        60
OIR    2025250     91400   21.1800 -109.1500       8.6        41       105        60
OIR    2025250     91400   21.1800 -109.1600       8.6        41       105        60
OIR    2025250     91400   21.1800 -109.1700       8.6        40       105        60
OIR    2025250     91400   21.1800 -109.1800       8.5        40       108        60
OIR    2025250     91400   21.1800 -109.1900       8.5        40       109        60
OIR    2025250     91400   21.1800 -109.2000       8.5        40       109        60
OIR    2025250     91400   21.1800 -109.2100       8.5        40       109        60
OIR    2025250     91400   21.1800 -109.2200       8.4        39       108        60
OIR    2025250     91400   21.1800 -109.2300       8.3        39       107        60
OIR    2025250     91400   21.1800 -109.2400       8.3        39       105        60
OIR    2025250     91400   21.1800 -109.2500       8.2        39       104        60
OIR    2025250     91400   21.1800 -109.2600       8.1        39       104        60
OIR    2025250     91400   21.1800 -109.2700       8.1        39       103        60
OIR    2025250     91400   21.1800 -109.2800       8.0        39       103        60
OIR    2025250     91400   21.1800 -109.2900       7.9        39       103        60
OIR    2025250     91400   21.1800 -109.3000       7.8        39       103        60
OIR    2025250     91400   21.1800 -109.3100       7.8        39       103        60
OIR    2025250     91400   21.1800 -109.3200       7.7        38       103        60
OIR    2025250     91400   21.1800 -109.3300       7.6        38       104        60
OIR    2025250     91400   21.1800 -109.3400       7.5        38       104        60
OIR    2025250     91400   21.1800 -109.3500       7.3        38       104        60
OIR    2025250     91400   21.1800 -109.3600       7.2        38       105        60
OIR    2025250     91400   21.1800 -109.3700       7.1        38       105        60
OIR    2025250     91400   21.1800 -109.3800       6.9        38       105        60
OIR    2025250     91400   21.1800 -109.3900       6.4        38       107        60
OIR    2025250     91400   21.1800 -109.4000       5.3        36       107        60
OIR    2025250     91400   21.1800 -109.4100       4.2        35       107        60
OIR    2025250     91400   21.1800 -109.4200       4.0        36       108        60
OIR    2025250     91400   21.1700 -108.9300      13.8        45       139        60
OIR    2025250     91400   21.1700 -108.9400      13.5        45       136        60
OIR    2025250     91400   21.1700 -108.9500      13.4        45       132        60
OIR    2025250     91400   21.1700 -108.9600      13.6        44       126        60
OIR    2025250     91400   21.1700 -108.9700      13.6        44       119        60
OIR    2025250     91400   21.1700 -108.9800      13.6        44       116        60
OIR    2025250     91400   21.1700 -108.9900      13.6        44       114        60
OIR    2025250     91400   21.1700 -109.0000      13.5        44       112        60
OIR    2025250     91400   21.1700 -109.0100      13.5        44       111        60
OIR    2025250     91400   21.1700 -109.0200      13.4        44       109        60
OIR    2025250     91400   21.1700 -109.0300      12.8        44       110        60
OIR    2025250     91400   21.1700 -109.0400      11.1        43       110        60
OIR    2025250     91400   21.1700 -109.0500       9.8        42       110        60
OIR    2025250     91400   21.1700 -109.0600       9.3        42       109        60
OIR    2025250     91400   21.1700 -109.0700       9.1        42       109        60
OIR    2025250     91400   21.1700 -109.0800       9.0        42       108        60
OIR    2025250     91400   21.1700 -109.0900       8.9        42       109        60
OIR    2025250     91400   21.1700 -109.1000       8.8        41       109        60
OIR    2025250     91400   21.1700 -109.1100       8.8        41       109        60
OIR    2025250     91400   21.1700 -109.1200       8.7        41       109        60
OIR    2025250     91400   21.1700 -109.1300       8.7        41       109        60
OIR    2025250     91400   21.1700 -109.1400       8.7        41       108        60
OIR    2025250     91400   21.1700 -109.1500       8.7        41       107        60
OIR    2025250     91400   21.1700 -109.1600       8.6        40       107        60
OIR    2025250     91400   21.1700 -109.1700       8.6        40       107        60
OIR    2025250     91400   21.1700 -109.1800       8.6        40       108        60
OIR    2025250     91400   21.1700 -109.1900       8.6        40       109        60
OIR    2025250     91400   21.1700 -109.2000       8.5        40       109        60
OIR    2025250     91400   21.1700 -109.2100       8.5        39       108        60
OIR    2025250     91400   21.1700 -109.2200       8.4        39       108        60
OIR    2025250     91400   21.1700 -109.2300       8.4        39       107        60
OIR    2025250     91400   21.1700 -109.2400       8.3        39       107        60
OIR    2025250     91400   21.1700 -109.2500       8.2        39       105        60
OIR    2025250     91400   21.1700 -109.2600       8.2        39       104        60
OIR    2025250     91400   21.1700 -109.2700       8.1        39       104        60
OIR    2025250     91400   21.1700 -109.2800       8.0        39       104        60
OIR    2025250     91400   21.1700 -109.2900       8.0        38       104        60
OIR    2025250     91400   21.1700 -109.3000       7.9        38       104        60
OIR    2025250     91400   21.1700 -109.3100       7.8        38       104        60
OIR    2025250     91400   21.1700 -109.3200       7.7        38       104        60
OIR    2025250     91400   21.1700 -109.3300       7.6        38       104        60
OIR    2025250     91400   21.1700 -109.3400       7.5        38       104        60
OIR    2025250     91400   21.1700 -109.3500       7.4        38       105        60
OIR    2025250     91400   21.1700 -109.3600       7.3        38       105        60
OIR    2025250     91400   21.1700 -109.3700       7.1        37       107        60
OIR    2025250     91400   21.1700 -109.3800       6.9        37       107        60
OIR    2025250     91400   21.1700 -109.3900       6.6        37       107        60
OIR    2025250     91400   21.1700 -109.4000       5.2        36       107        60
OIR    2025250     91400   21.1700 -109.4100       4.2        35       107        60
OIR    2025250     91400   21.1700 -109.4200       4.0        35       107        60
OIR    2025250     91400   21.1700 -109.4300       4.0        36       109        60
OIR    2025250     91400   21.1600 -108.9400      13.4        43       138        60
OIR    2025250     91400   21.1600 -108.9500      13.2        43       135        60
OIR    2025250     91400   21.1600 -108.9600      13.2        43       128        60
OIR    2025250     91400   21.1600 -108.9700      13.5        44       120        60
OIR    2025250     91400   21.1600 -108.9800      13.6        44       116        60
OIR    2025250     91400   21.1600 -108.9900      13.6        44       116        60
OIR    2025250     91400   21.1600 -109.0000      13.5        44       115        60
OIR    2025250     91400   21.1600 -109.0100      13.5        44       113        60
OIR    2025250     91400   21.1600 -109.0200      13.4        44       110        60
OIR    2025250     91400   21.1600 -109.0300      12.9        44       110        60
OIR    2025250     91400   21.1600 -109.0400      11.4        44       111        60
OIR    2025250     91400   21.1600 -109.0500      10.1        43       111        60
OIR    2025250     91400   21.1600 -109.0600       9.4        42       110        60
OIR    2025250     91400   21.1600 -109.0700       9.2        42       110        60
OIR    2025250     91400   21.1600 -109.0800       9.1        42       109        60
OIR    2025250     91400   21.1600 -109.0900       9.0        42       109        60
OIR    2025250     91400   21.1600 -109.1000       8.9        41       109        60
OIR    2025250     91400   21.1600 -109.1100       8.8        41       110        60
OIR    2025250     91400   21.1600 -109.1200       8.8        41       110        60
OIR    2025250     91400   21.1600 -109.1300       8.8        41       110        60
OIR    2025250     91400   21.1600 -109.1400       8.7        41       109        60
OIR    2025250     91400   21.1600 -109.1500       8.7        40       109        60
OIR    2025250     91400   21.1600 -109.1600       8.7        40       108        60
OIR    2025250     91400   21.1600 -109.1700       8.6        40       107        60
OIR    2025250     91400   21.1600 -109.1800       8.6        40       108        60
OIR    2025250     91400   21.1600 -109.1900       8.6        39       109        60
OIR    2025250     91400   21.1600 -109.2000       8.6        39       109        60
OIR    2025250     91400   21.1600 -109.2100       8.5        39       108        60
OIR    2025250     91400   21.1600 -109.2200       8.5        39       107        60
OIR    2025250     91400   21.1600 -109.2300       8.4        39       107        60
OIR    2025250     91400   21.1600 -109.2400       8.4        39       107        60
OIR    2025250     91400   21.1600 -109.2500       8.3        39       107        60
OIR    2025250     91400   21.1600 -109.2600       8.2        39       105        60
OIR    2025250     91400   21.1600 -109.2700       8.2        38       104        60
OIR    2025250     91400   21.1600 -109.2800       8.1        38       104        60
OIR    2025250     91400   21.1600 -109.2900       8.0        38       104        60
OIR    2025250     91400   21.1600 -109.3000       7.9        38       104        60
OIR    2025250     91400   21.1600 -109.3100       7.9        38       104        60
OIR    2025250     91400   21.1600 -109.3200       7.7        38       104        60
OIR    2025250     91400   21.1600 -109.3300       7.6        37       105        60
OIR    2025250     91400   21.1600 -109.3400       7.5        37       105        60
OIR    2025250     91400   21.1600 -109.3500       7.4        37       107        60
OIR    2025250     91400   21.1600 -109.3600       7.3        37       107        60
OIR    2025250     91400   21.1600 -109.3700       7.1        37       108        60
OIR    2025250     91400   21.1600 -109.3800       7.0        37       107        60
OIR    2025250     91400   21.1600 -109.3900       6.6        36       105        60
OIR    2025250     91400   21.1600 -109.4000       5.4        36       105        60
OIR    2025250     91400   21.1600 -109.4100       4.4        35       105        60
OIR    2025250     91400   21.1600 -109.4200       4.1        35       107        60
OIR    2025250     91400   21.1600 -109.4300       4.0        35       108        60
OIR    2025250     91400   21.1600 -109.4400       4.0        35       109        60
OIR    2025250     91400   21.1500 -108.9500      13.2        42       139        60
OIR    2025250     91400   21.1500 -108.9600      13.1        42       132        60
OIR    2025250     91400   21.1500 -108.9700      13.4        43       122        60
OIR    2025250     91400   21.1500 -108.9800      13.5        44       116        60
OIR    2025250     91400   21.1500 -108.9900      13.5        44       116        60
OIR    2025250     91400   21.1500 -109.0000      13.5        44       117        60
OIR    2025250     91400   21.1500 -109.0100      13.5        44       116        60
OIR    2025250     91400   21.1500 -109.0200      13.4        44       112        60
OIR    2025250     91400   21.1500 -109.0300      12.8        44       110        60
OIR    2025250     91400   21.1500 -109.0400      11.4        44       110        60
OIR    2025250     91400   21.1500 -109.0500      10.2        43       111        60
OIR    2025250     91400   21.1500 -109.0600       9.5        42       110        60
OIR    2025250     91400   21.1500 -109.0700       9.3        42       110        60
OIR    2025250     91400   21.1500 -109.0800       9.2        42       109        60
OIR    2025250     91400   21.1500 -109.0900       9.1        41       109        60
OIR    2025250     91400   21.1500 -109.1000       9.0        41       109        60
OIR    2025250     91400   21.1500 -109.1100       8.9        41       109        60
OIR    2025250     91400   21.1500 -109.1200       8.9        41       109        60
OIR    2025250     91400   21.1500 -109.1300       8.8        41       109        60
OIR    2025250     91400   21.1500 -109.1400       8.8        40       108        60
OIR    2025250     91400   21.1500 -109.1500       8.8        40       108        60
OIR    2025250     91400   21.1500 -109.1600       8.7        40       108        60
OIR    2025250     91400   21.1500 -109.1700       8.7        40       107        60
OIR    2025250     91400   21.1500 -109.1800       8.7        39       107        60
OIR    2025250     91400   21.1500 -109.1900       8.7        39       108        60
OIR    2025250     91400   21.1500 -109.2000       8.6        39       109        60
OIR    2025250     91400   21.1500 -109.2100       8.6        39       108        60
OIR    2025250     91400   21.1500 -109.2200       8.5        39       107        60
OIR    2025250     91400   21.1500 -109.2300       8.5        39       107        60
OIR    2025250     91400   21.1500 -109.2400       8.4        39       107        60
OIR    2025250     91400   21.1500 -109.2500       8.3        38       107        60
OIR    2025250     91400   21.1500 -109.2600       8.3        38       105        60
OIR    2025250     91400   21.1500 -109.2700       8.2        38       105        60
OIR    2025250     91400   21.1500 -109.2800       8.1        38       105        60
OIR    2025250     91400   21.1500 -109.2900       8.1        38       105        60
OIR    2025250     91400   21.1500 -109.3000       8.0        38       105        60
OIR    2025250     91400   21.1500 -109.3100       7.9        37       105        60
OIR    2025250     91400   21.1500 -109.3200       7.8        37       105        60
OIR    2025250     91400   21.1500 -109.3300       7.7        37       107        60
OIR    2025250     91400   21.1500 -109.3400       7.6        37       107        60
OIR    2025250     91400   21.1500 -109.3500       7.5        37       107        60
OIR    2025250     91400   21.1500 -109.3600       7.4        37       107        60
OIR    2025250     91400   21.1500 -109.3700       7.2        36       108        60
OIR    2025250     91400   21.1500 -109.3800       7.0        36       107        60
OIR    2025250     91400   21.1500 -109.3900       6.7        36       105        60
OIR    2025250     91400   21.1500 -109.4000       5.6        36       104        60
OIR    2025250     91400   21.1500 -109.4100       4.7        36       105        60
OIR    2025250     91400   21.1500 -109.4200       4.2        35       107        60
OIR    2025250     91400   21.1500 -109.4300       4.1        35       108        60
OIR    2025250     91400   21.1500 -109.4400       4.0        35       108        60
OIR    2025250     91400   21.1500 -109.4500       4.0        35       109        60
OIR    2025250     91400   21.1400 -108.9400      13.3        39       140        60
OIR    2025250     91400   21.1400 -108.9500      13.2        40       135        60
OIR    2025250     91400   21.1400 -108.9600      13.1        40       130        60
OIR    2025250     91400   21.1400 -108.9700      13.2        42       125        60
OIR    2025250     91400   21.1400 -108.9800      13.5        43       120        60
OIR    2025250     91400   21.1400 -108.9900      13.5        43       119        60
OIR    2025250     91400   21.1400 -109.0000      13.5        44       119        60
OIR    2025250     91400   21.1400 -109.0100      13.4        44       116        60
OIR    2025250     91400   21.1400 -109.0200      13.4        44       112        60
OIR    2025250     91400   21.1400 -109.0300      12.7        43       108        60
OIR    2025250     91400   21.1400 -109.0400      11.3        43       109        60
OIR    2025250     91400   21.1400 -109.0500      10.2        43       110        60
OIR    2025250     91400   21.1400 -109.0600       9.6        42       110        60
OIR    2025250     91400   21.1400 -109.0700       9.3        42       110        60
OIR    2025250     91400   21.1400 -109.0800       9.2        41       109        60
OIR    2025250     91400   21.1400 -109.0900       9.2        41       109        60
OIR    2025250     91400   21.1400 -109.1000       9.1        41       109        60
OIR    2025250     91400   21.1400 -109.1100       9.0        41       109        60
OIR    2025250     91400   21.1400 -109.1200       8.9        41       108        60
OIR    2025250     91400   21.1400 -109.1300       8.9        40       107        60
OIR    2025250     91400   21.1400 -109.1400       8.9        40       107        60
OIR    2025250     91400   21.1400 -109.1500       8.8        40       108        60
OIR    2025250     91400   21.1400 -109.1600       8.8        40       107        60
OIR    2025250     91400   21.1400 -109.1700       8.8        39       105        60
OIR    2025250     91400   21.1400 -109.1800       8.7        39       104        60
OIR    2025250     91400   21.1400 -109.1900       8.7        39       107        60
OIR    2025250     91400   21.1400 -109.2000       8.7        39       108        60
OIR    2025250     91400   21.1400 -109.2100       8.6        39       108        60
OIR    2025250     91400   21.1400 -109.2200       8.6        39       107        60
OIR    2025250     91400   21.1400 -109.2300       8.6        38       107        60
OIR    2025250     91400   21.1400 -109.2400       8.5        38       105        60
OIR    2025250     91400   21.1400 -109.2500       8.4        38       105        60
OIR    2025250     91400   21.1400 -109.2600       8.3        38       105        60
OIR    2025250     91400   21.1400 -109.2700       8.3        38       105        60
OIR    2025250     91400   21.1400 -109.2800       8.2        38       105        60
OIR    2025250     91400   21.1400 -109.2900       8.1        37       107        60
OIR    2025250     91400   21.1400 -109.3000       8.1        37       107        60
OIR    2025250     91400   21.1400 -109.3100       8.0        37       107        60
OIR    2025250     91400   21.1400 -109.3200       7.9        37       107        60
OIR    2025250     91400   21.1400 -109.3300       7.8        37       107        60
OIR    2025250     91400   21.1400 -109.3400       7.7        36       107        60
OIR    2025250     91400   21.1400 -109.3500       7.5        36       107        60
OIR    2025250     91400   21.1400 -109.3600       7.4        36       107        60
OIR    2025250     91400   21.1400 -109.3700       7.3        36       107        60
OIR    2025250     91400   21.1400 -109.3800       7.2        36       107        60
OIR    2025250     91400   21.1400 -109.3900       6.8        36       105        60
OIR    2025250     91400   21.1400 -109.4000       5.5        35       104        60
OIR    2025250     91400   21.1400 -109.4100       4.9        35       104        60
OIR    2025250     91400   21.1400 -109.4200       4.4        35       105        60
OIR    2025250     91400   21.1400 -109.4300       4.2        35       105        60
OIR    2025250     91400   21.1400 -109.4400       4.1        35       107        60
OIR    2025250     91400   21.1400 -109.4500       4.0        35       108        60
OIR    2025250     91400   21.1300 -108.9500      13.1        39       133        60
OIR    2025250     91400   21.1300 -108.9600      13.1        40       125        60
OIR    2025250     91400   21.1300 -108.9700      13.2        41       126        60
OIR    2025250     91400   21.1300 -108.9800      13.4        43       127        60
OIR    2025250     91400   21.1300 -108.9900      13.5        43       123        60
OIR    2025250     91400   21.1300 -109.0000      13.4        43       120        60
OIR    2025250     91400   21.1300 -109.0100      13.4        43       116        60
OIR    2025250     91400   21.1300 -109.0200      13.3        43       111        60
OIR    2025250     91400   21.1300 -109.0300      12.7        43       107        60
OIR    2025250     91400   21.1300 -109.0400      11.2        42       108        60
OIR    2025250     91400   21.1300 -109.0500      10.1        42       108        60
OIR    2025250     91400   21.1300 -109.0600       9.6        42       109        60
OIR    2025250     91400   21.1300 -109.0700       9.4        41       109        60
OIR    2025250     91400   21.1300 -109.0800       9.3        41       108        60
OIR    2025250     91400   21.1300 -109.0900       9.2        41       108        60
OIR    2025250     91400   21.1300 -109.1000       9.1        41       109        60
OIR    2025250     91400   21.1300 -109.1100       9.1        40       108        60
OIR    2025250     91400   21.1300 -109.1200       9.0        40       107        60
OIR    2025250     91400   21.1300 -109.1300       9.0        40       105        60
OIR    2025250     91400   21.1300 -109.1400       8.9        40       104        60
OIR    2025250     91400   21.1300 -109.1500       8.9        40       104        60
OIR    2025250     91400   21.1300 -109.1600       8.8        39       104        60
OIR    2025250     91400   21.1300 -109.1700       8.8        39       104        60
OIR    2025250     91400   21.1300 -109.1800       8.8        39       104        60
OIR    2025250     91400   21.1300 -109.1900       8.7        39       104        60
OIR    2025250     91400   21.1300 -109.2000       8.7        39       104        60
OIR    2025250     91400   21.1300 -109.2100       8.7        39       105        60
OIR    2025250     91400   21.1300 -109.2200       8.6        38       105        60
OIR    2025250     91400   21.1300 -109.2300       8.6        38       104        60
OIR    2025250     91400   21.1300 -109.2400       8.6        38       104        60
OIR    2025250     91400   21.1300 -109.2500       8.5        38       104        60
OIR    2025250     91400   21.1300 -109.2600       8.4        38       104        60
OIR    2025250     91400   21.1300 -109.2700       8.3        37       104        60
OIR    2025250     91400   21.1300 -109.2800       8.3        37       105        60
OIR    2025250     91400   21.1300 -109.2900       8.2        37       105        60
OIR    2025250     91400   21.1300 -109.3000       8.1        37       105        60
OIR    2025250     91400   21.1300 -109.3100       8.1        37       107        60
OIR    2025250     91400   21.1300 -109.3200       8.0        36       107        60
OIR    2025250     91400   21.1300 -109.3300       7.9        36       107        60
OIR    2025250     91400   21.1300 -109.3400       7.8        36       107        60
OIR    2025250     91400   21.1300 -109.3500       7.6        36       105        60
OIR    2025250     91400   21.1300 -109.3600       7.5        36       105        60
OIR    2025250     91400   21.1300 -109.3700       7.3        36       105        60
OIR    2025250     91400   21.1300 -109.3800       7.2        36       105        60
OIR    2025250     91400   21.1300 -109.3900       7.0        36       105        60
OIR    2025250     91400   21.1300 -109.4000       5.6        35       104        60
OIR    2025250     91400   21.1300 -109.4100       5.0        35       104        60
OIR    2025250     91400   21.1300 -109.4200       4.7        35       104        60
OIR    2025250     91400   21.1300 -109.4300       4.3        34       104        60
OIR    2025250     91400   21.1300 -109.4400       4.1        34       105        60
OIR    2025250     91400   21.1300 -109.4500       4.1        34       107        60
OIR    2025250     91400   21.1300 -109.4600       4.0        34       108        60
OIR    2025250     91400   21.1200 -108.9500      13.1        39       139        60
OIR    2025250     91400   21.1200 -108.9600      13.1        40       132        60
OIR    2025250     91400   21.1200 -108.9700      13.3        41       129        60
OIR    2025250     91400   21.1200 -108.9800      13.5        42       129        60
OIR    2025250     91400   21.1200 -108.9900      13.5        43       126        60
OIR    2025250     91400   21.1200 -109.0000      13.5        43       122        60
OIR    2025250     91400   21.1200 -109.0100      13.4        43       117        60
OIR    2025250     91400   21.1200 -109.0200      13.3        43       114        60
OIR    2025250     91400   21.1200 -109.0300      12.5        43       110        60
OIR    2025250     91400   21.1200 -109.0400      10.8        42       108        60
OIR    2025250     91400   21.1200 -109.0500       9.9        41       108        60
OIR    2025250     91400   21.1200 -109.0600       9.5        41       108        60
OIR    2025250     91400   21.1200 -109.0700       9.4        41       108        60
OIR    2025250     91400   21.1200 -109.0800       9.3        41       108        60
OIR    2025250     91400   21.1200 -109.0900       9.3        41       108        60
OIR    2025250     91400   21.1200 -109.1000       9.2        40       108        60
OIR    2025250     91400   21.1200 -109.1100       9.1        40       108        60
OIR    2025250     91400   21.1200 -109.1200       9.1        40       107        60
OIR    2025250     91400   21.1200 -109.1300       9.0        40       104        60
OIR    2025250     91400   21.1200 -109.1400       9.0        40       104        60
OIR    2025250     91400   21.1200 -109.1500       8.9        39       103        60
OIR    2025250     91400   21.1200 -109.1600       8.9        39       103        60
OIR    2025250     91400   21.1200 -109.1700       8.8        39       103        60
OIR    2025250     91400   21.1200 -109.1800       8.8        39       104        60
OIR    2025250     91400   21.1200 -109.1900       8.8        39       104        60
OIR    2025250     91400   21.1200 -109.2000       8.8        38       103        60
OIR    2025250     91400   21.1200 -109.2100       8.7        38       103        60
OIR    2025250     91400   21.1200 -109.2200       8.7        38       103        60
OIR    2025250     91400   21.1200 -109.2300       8.6        38       104        60
OIR    2025250     91400   21.1200 -109.2400       8.6        38       104        60
OIR    2025250     91400   21.1200 -109.2500       8.5        38       104        60
OIR    2025250     91400   21.1200 -109.2600       8.5        37       104        60
OIR    2025250     91400   21.1200 -109.2700       8.4        37       104        60
OIR    2025250     91400   21.1200 -109.2800       8.3        37       104        60
OIR    2025250     91400   21.1200 -109.2900       8.3        37       104        60
OIR    2025250     91400   21.1200 -109.3000       8.2        37       104        60
OIR    2025250     91400   21.1200 -109.3100       8.1        36       104        60
OIR    2025250     91400   21.1200 -109.3200       8.1        36       105        60
OIR    2025250     91400   21.1200 -109.3300       8.0        36       107        60
OIR    2025250     91400   21.1200 -109.3400       7.8        36       105        60
OIR    2025250     91400   21.1200 -109.3500       7.7        36       104        60
OIR    2025250     91400   21.1200 -109.3600       7.6        36       104        60
OIR    2025250     91400   21.1200 -109.3700       7.4        35       104        60
OIR    2025250     91400   21.1200 -109.3800       7.2        35       104        60
OIR    2025250     91400   21.1200 -109.3900       7.1        36       104        60
OIR    2025250     91400   21.1200 -109.4000       5.9        35       104        60
OIR    2025250     91400   21.1200 -109.4100       5.1        35       104        60
OIR    2025250     91400   21.1200 -109.4200       4.8        34       104        60
OIR    2025250     91400   21.1200 -109.4300       4.6        34       104        60
OIR    2025250     91400   21.1200 -109.4400       4.3        34       104        60
OIR    2025250     91400   21.1200 -109.4500       4.2        33       105        60
OIR    2025250     91400   21.1200 -109.4600       4.1        33       107        60
OIR    2025250     91400   21.1100 -108.9700      13.3        41       136        60
OIR    2025250     91400   21.1100 -108.9800      13.5        42       132        60
OIR    2025250     91400   21.1100 -108.9900      13.5        43       129        60
OIR    2025250     91400   21.1100 -109.0000      13.5        43       124        60
OIR    2025250     91400   21.1100 -109.0100      13.4        43       120        60
OIR    2025250     91400   21.1100 -109.0200      13.1        44       116        60
OIR    2025250     91400   21.1100 -109.0300      11.9        43       115        60
OIR    2025250     91400   21.1100 -109.0400      10.3        41       112        60
OIR    2025250     91400   21.1100 -109.0500       9.7        41       110        60
OIR    2025250     91400   21.1100 -109.0600       9.5        41       109        60
OIR    2025250     91400   21.1100 -109.0700       9.4        41       108        60
OIR    2025250     91400   21.1100 -109.0800       9.3        41       109        60
OIR    2025250     91400   21.1100 -109.0900       9.3        41       109        60
OIR    2025250     91400   21.1100 -109.1000       9.2        40       109        60
OIR    2025250     91400   21.1100 -109.1100       9.1        40       109        60
OIR    2025250     91400   21.1100 -109.1200       9.1        40       108        60
OIR    2025250     91400   21.1100 -109.1300       9.0        40       107        60
OIR    2025250     91400   21.1100 -109.1400       9.0        40       105        60
OIR    2025250     91400   21.1100 -109.1500       9.0        39       105        60
OIR    2025250     91400   21.1100 -109.1600       8.9        39       104        60
OIR    2025250     91400   21.1100 -109.1700       8.9        39       104        60
OIR    2025250     91400   21.1100 -109.1800       8.9        39       104        60
OIR    2025250     91400   21.1100 -109.1900       8.8        38       104        60
OIR    2025250     91400   21.1100 -109.2000       8.8        38       104        60
OIR    2025250     91400   21.1100 -109.2100       8.8        38       104        60
OIR    2025250     91400   21.1100 -109.2200       8.7        38       104        60
OIR    2025250     91400   21.1100 -109.2300       8.7        38       104        60
OIR    2025250     91400   21.1100 -109.2400       8.6        38       104        60
OIR    2025250     91400   21.1100 -109.2500       8.6        37       104        60
OIR    2025250     91400   21.1100 -109.2600       8.5        37       104        60
OIR    2025250     91400   21.1100 -109.2700       8.5        37       104        60
OIR    2025250     91400   21.1100 -109.2800       8.4        37       104        60
OIR    2025250     91400   21.1100 -109.2900       8.3        37       105        60
OIR    2025250     91400   21.1100 -109.3000       8.3        36       104        60
OIR    2025250     91400   21.1100 -109.3100       8.2        36       104        60
OIR    2025250     91400   21.1100 -109.3200       8.1        36       105        60
OIR    2025250     91400   21.1100 -109.3300       8.0        36       107        60
OIR    2025250     91400   21.1100 -109.3400       7.9        36       107        60
OIR    2025250     91400   21.1100 -109.3500       7.8        36       104        60
OIR    2025250     91400   21.1100 -109.3600       7.6        35       104        60
OIR    2025250     91400   21.1100 -109.3700       7.5        35       103        60
OIR    2025250     91400   21.1100 -109.3800       7.3        35       103        60
OIR    2025250     91400   21.1100 -109.3900       7.1        35       103        60
OIR    2025250     91400   21.1100 -109.4000       6.5        35       103        60
OIR    2025250     91400   21.1100 -109.4100       5.3        35       103        60
OIR    2025250     91400   21.1100 -109.4200       4.9        34       103        60
OIR    2025250     91400   21.1100 -109.4300       4.7        34       103        60
OIR    2025250     91400   21.1100 -109.4400       4.4        34       103        60
OIR    2025250     91400   21.1100 -109.4500       4.3        33       104        60
OIR    2025250     91400   21.1100 -109.4600       4.1        33       105        60
OIR    2025250     91400   21.1100 -109.4700       4.0        32       108        60
OIR    2025250     91400   21.1000 -108.9700      13.4        41       139        60
OIR    2025250     91400   21.1000 -108.9800      13.6        44       134        60
OIR    2025250     91400   21.1000 -108.9900      13.6        45       129        60
OIR    2025250     91400   21.1000 -109.0000      13.5        44       125        60
OIR    2025250     91400   21.1000 -109.0100      13.3        45       121        60
OIR    2025250     91400   21.1000 -109.0200      12.7        45       117        60
OIR    2025250     91400   21.1000 -109.0300      11.2        43       116        60
OIR    2025250     91400   21.1000 -109.0400       9.9        41       115        60
OIR    2025250     91400   21.1000 -109.0500       9.6        41       113        60
OIR    2025250     91400   21.1000 -109.0600       9.5        41       109        60
OIR    2025250     91400   21.1000 -109.0700       9.4        41       108        60
OIR    2025250     91400   21.1000 -109.0800       9.3        41       109        60
OIR    2025250     91400   21.1000 -109.0900       9.3        40       110        60
OIR    2025250     91400   21.1000 -109.1000       9.2        40       110        60
OIR    2025250     91400   21.1000 -109.1100       9.2        40       109        60
OIR    2025250     91400   21.1000 -109.1200       9.1        40       109        60
OIR    2025250     91400   21.1000 -109.1300       9.1        40       108        60
OIR    2025250     91400   21.1000 -109.1400       9.0        39       107        60
OIR    2025250     91400   21.1000 -109.1500       9.0        39       108        60
OIR    2025250     91400   21.1000 -109.1600       9.0        39       108        60
OIR    2025250     91400   21.1000 -109.1700       8.9        39       108        60
OIR    2025250     91400   21.1000 -109.1800       8.9        39       107        60
OIR    2025250     91400   21.1000 -109.1900       8.9        38       105        60
OIR    2025250     91400   21.1000 -109.2000       8.8        38       104        60
OIR    2025250     91400   21.1000 -109.2100       8.8        38       104        60
OIR    2025250     91400   21.1000 -109.2200       8.8        38       104        60
OIR    2025250     91400   21.1000 -109.2300       8.7        38       104        60
OIR    2025250     91400   21.1000 -109.2400       8.7        38       104        60
OIR    2025250     91400   21.1000 -109.2500       8.6        37       104        60
OIR    2025250     91400   21.1000 -109.2600       8.6        37       104        60
OIR    2025250     91400   21.1000 -109.2700       8.5        37       105        60
OIR    2025250     91400   21.1000 -109.2800       8.5        37       107        60
OIR    2025250     91400   21.1000 -109.2900       8.4        37       108        60
OIR    2025250     91400   21.1000 -109.3000       8.3        36       108        60
OIR    2025250     91400   21.1000 -109.3100       8.3        36       108        60
OIR    2025250     91400   21.1000 -109.3200       8.2        36       109        60
OIR    2025250     91400   21.1000 -109.3300       8.1        36       108        60
OIR    2025250     91400   21.1000 -109.3400       8.0        35       108        60
OIR    2025250     91400   21.1000 -109.3500       7.9        35       107        60
OIR    2025250     91400   21.1000 -109.3600       7.7        35       105        60
OIR    2025250     91400   21.1000 -109.3700       7.5        35       104        60
OIR    2025250     91400   21.1000 -109.3800       7.3        35       104        60
OIR    2025250     91400   21.1000 -109.3900       7.1        35       103        60
OIR    2025250     91400   21.1000 -109.4000       6.7        35       104        60
OIR    2025250     91400   21.1000 -109.4100       5.9        35       104        60
OIR    2025250     91400   21.1000 -109.4200       5.1        34       104        60
OIR    2025250     91400   21.1000 -109.4300       4.8        34       105        60
OIR    2025250     91400   21.1000 -109.4400       4.5        33       105        60
OIR    2025250     91400   21.1000 -109.4500       4.4        33       107        60
OIR    2025250     91400   21.1000 -109.4600       4.2        32       108        60
OIR    2025250     91400   21.1000 -109.4700       4.1        31       108        60
OIR    2025250     91400   21.0900 -108.9800      13.4        47       135        60
OIR    2025250     91400   21.0900 -108.9900      13.6        48       129        60
OIR    2025250     91400   21.0900 -109.0000      13.4        49       125        60
OIR    2025250     91400   21.0900 -109.0100      12.9        49       121        60
OIR    2025250     91400   21.0900 -109.0200      11.9        47       116        60
OIR    2025250     91400   21.0900 -109.0300      10.6        44       116        60
OIR    2025250     91400   21.0900 -109.0400       9.8        42       116        60
OIR    2025250     91400   21.0900 -109.0500       9.6        41       114        60
OIR    2025250     91400   21.0900 -109.0600       9.5        41       110        60
OIR    2025250     91400   21.0900 -109.0700       9.4        41       107        60
OIR    2025250     91400   21.0900 -109.0800       9.3        41       109        60
OIR    2025250     91400   21.0900 -109.0900       9.3        40       110        60
OIR    2025250     91400   21.0900 -109.1000       9.2        40       110        60
OIR    2025250     91400   21.0900 -109.1100       9.2        40       110        60
OIR    2025250     91400   21.0900 -109.1200       9.1        40       109        60
OIR    2025250     91400   21.0900 -109.1300       9.1        40       109        60
OIR    2025250     91400   21.0900 -109.1400       9.0        39       109        60
OIR    2025250     91400   21.0900 -109.1500       9.0        39       109        60
OIR    2025250     91400   21.0900 -109.1600       9.0        39       109        60
OIR    2025250     91400   21.0900 -109.1700       9.0        39       109        60
OIR    2025250     91400   21.0900 -109.1800       8.9        38       108        60
OIR    2025250     91400   21.0900 -109.1900       8.9        38       108        60
OIR    2025250     91400   21.0900 -109.2000       8.9        38       107        60
OIR    2025250     91400   21.0900 -109.2100       8.8        38       105        60
OIR    2025250     91400   21.0900 -109.2200       8.8        38       104        60
OIR    2025250     91400   21.0900 -109.2300       8.7        38       105        60
OIR    2025250     91400   21.0900 -109.2400       8.7        37       105        60
OIR    2025250     91400   21.0900 -109.2500       8.6        37       105        60
OIR    2025250     91400   21.0900 -109.2600       8.6        37       105        60
OIR    2025250     91400   21.0900 -109.2700       8.6        37       107        60
OIR    2025250     91400   21.0900 -109.2800       8.5        37       107        60
OIR    2025250     91400   21.0900 -109.2900       8.5        36       108        60
OIR    2025250     91400   21.0900 -109.3000       8.4        36       109        60
OIR    2025250     91400   21.0900 -109.3100       8.3        36       109        60
OIR    2025250     91400   21.0900 -109.3200       8.2        36       110        60
OIR    2025250     91400   21.0900 -109.3300       8.2        35       109        60
OIR    2025250     91400   21.0900 -109.3400       8.1        35       108        60
OIR    2025250     91400   21.0900 -109.3500       8.0        35       108        60
OIR    2025250     91400   21.0900 -109.3600       7.8        35       108        60
OIR    2025250     91400   21.0900 -109.3700       7.6        35       107        60
OIR    2025250     91400   21.0900 -109.3800       7.4        35       105        60
OIR    2025250     91400   21.0900 -109.3900       7.2        35       104        60
OIR    2025250     91400   21.0900 -109.4000       6.8        35       104        60
OIR    2025250     91400   21.0900 -109.4100       6.2        35       105        60
OIR    2025250     91400   21.0900 -109.4200       5.5        34       107        60
OIR    2025250     91400   21.0900 -109.4300       5.0        34       108        60
OIR    2025250     91400   21.0900 -109.4400       4.7        33       108        60
OIR    2025250     91400   21.0900 -109.4500       4.5        32       109        60
OIR    2025250     91400   21.0900 -109.4600       4.4        31       110        60
OIR    2025250     91400   21.0900 -109.4700       4.2        30       110        60
OIR    2025250     91400   21.0900 -109.4800       4.0        30       110        60
OIR    2025250     91400   21.0800 -108.9700      12.9        47       141        60
OIR    2025250     91400   21.0800 -108.9800      13.2        48       135        60
OIR    2025250     91400   21.0800 -108.9900      13.4        53       129        60
OIR    2025250     91400   21.0800 -109.0000      13.1        55       125        60
OIR    2025250     91400   21.0800 -109.0100      12.6        54       121        60
OIR    2025250     91400   21.0800 -109.0200      11.5        50       116        60
OIR    2025250     91400   21.0800 -109.0300      10.3        45       116        60
OIR    2025250     91400   21.0800 -109.0400       9.7        42       116        60
OIR    2025250     91400   21.0800 -109.0500       9.6        41       115        60
OIR    2025250     91400   21.0800 -109.0600       9.5        41       111        60
OIR    2025250     91400   21.0800 -109.0700       9.4        41       108        60
OIR    2025250     91400   21.0800 -109.0800       9.3        41       108        60
OIR    2025250     91400   21.0800 -109.0900       9.3        40       110        60
OIR    2025250     91400   21.0800 -109.1000       9.2        40       111        60
OIR    2025250     91400   21.0800 -109.1100       9.2        40       110        60
OIR    2025250     91400   21.0800 -109.1200       9.2        40       109        60
OIR    2025250     91400   21.0800 -109.1300       9.1        39       110        60
OIR    2025250     91400   21.0800 -109.1400       9.1        39       110        60
OIR    2025250     91400   21.0800 -109.1500       9.0        39       111        60
OIR    2025250     91400   21.0800 -109.1600       9.0        39       111        60
OIR    2025250     91400   21.0800 -109.1700       9.0        39       111        60
OIR    2025250     91400   21.0800 -109.1800       8.9        38       110        60
OIR    2025250     91400   21.0800 -109.1900       8.9        38       109        60
OIR    2025250     91400   21.0800 -109.2000       8.9        38       108        60
OIR    2025250     91400   21.0800 -109.2100       8.9        38       107        60
OIR    2025250     91400   21.0800 -109.2200       8.8        38       104        60
OIR    2025250     91400   21.0800 -109.2300       8.8        37       105        60
OIR    2025250     91400   21.0800 -109.2400       8.7        37       107        60
OIR    2025250     91400   21.0800 -109.2500       8.7        37       107        60
OIR    2025250     91400   21.0800 -109.2600       8.6        37       107        60
OIR    2025250     91400   21.0800 -109.2700       8.6        37       107        60
OIR    2025250     91400   21.0800 -109.2800       8.6        36       108        60
OIR    2025250     91400   21.0800 -109.2900       8.5        36       109        60
OIR    2025250     91400   21.0800 -109.3000       8.5        36       108        60
OIR    2025250     91400   21.0800 -109.3100       8.4        36       108        60
OIR    2025250     91400   21.0800 -109.3200       8.3        36       108        60
OIR    2025250     91400   21.0800 -109.3300       8.2        35       108        60
OIR    2025250     91400   21.0800 -109.3400       8.1        35       108        60
OIR    2025250     91400   21.0800 -109.3500       8.0        35       107        60
OIR    2025250     91400   21.0800 -109.3600       7.9        35       107        60
OIR    2025250     91400   21.0800 -109.3700       7.8        35       105        60
OIR    2025250     91400   21.0800 -109.3800       7.6        35       105        60
OIR    2025250     91400   21.0800 -109.3900       7.3        35       104        60
OIR    2025250     91400   21.0800 -109.4000       7.0        35       104        60
OIR    2025250     91400   21.0800 -109.4100       6.4        35       107        60
OIR    2025250     91400   21.0800 -109.4200       5.8        34       108        60
OIR    2025250     91400   21.0800 -109.4300       5.3        33       108        60
OIR    2025250     91400   21.0800 -109.4400       4.9        32       109        60
OIR    2025250     91400   21.0800 -109.4500       4.7        31       109        60
OIR    2025250     91400   21.0800 -109.4600       4.5        31       110        60
OIR    2025250     91400   21.0800 -109.4700       4.3        30       110        60
OIR    2025250     91400   21.0800 -109.4800       4.1        30       109        60
OIR    2025250     91400   21.0800 -109.4900       4.0        29       108        60
OIR    2025250     91400   21.0700 -108.9700      12.5        50       138        60
OIR    2025250     91400   21.0700 -108.9800      12.7        55       133        60
OIR    2025250     91400   21.0700 -108.9900      13.0        59       128        60
OIR    2025250     91400   21.0700 -109.0000      12.9        59       124        60
OIR    2025250     91400   21.0700 -109.0100      12.4        57       120        60
OIR    2025250     91400   21.0700 -109.0200      11.0        51       116        60
OIR    2025250     91400   21.0700 -109.0300      10.0        45       115        60
OIR    2025250     91400   21.0700 -109.0400       9.6        42       114        60
OIR    2025250     91400   21.0700 -109.0500       9.5        42       114        60
OIR    2025250     91400   21.0700 -109.0600       9.5        41       112        60
OIR    2025250     91400   21.0700 -109.0700       9.4        41       109        60
OIR    2025250     91400   21.0700 -109.0800       9.3        41       109        60
OIR    2025250     91400   21.0700 -109.0900       9.3        40       109        60
OIR    2025250     91400   21.0700 -109.1000       9.3        40       110        60
OIR    2025250     91400   21.0700 -109.1100       9.2        40       109        60
OIR    2025250     91400   21.0700 -109.1200       9.2        40       109        60
OIR    2025250     91400   21.0700 -109.1300       9.1        39       109        60
OIR    2025250     91400   21.0700 -109.1400       9.1        39       109        60
OIR    2025250     91400   21.0700 -109.1500       9.0        39       109        60
OIR    2025250     91400   21.0700 -109.1600       9.0        39       110        60
OIR    2025250     91400   21.0700 -109.1700       9.0        38       110        60
OIR    2025250     91400   21.0700 -109.1800       9.0        38       110        60
OIR    2025250     91400   21.0700 -109.1900       8.9        38       110        60
OIR    2025250     91400   21.0700 -109.2000       8.9        38       109        60
OIR    2025250     91400   21.0700 -109.2100       8.9        38       107        60
OIR    2025250     91400   21.0700 -109.2200       8.8        38       105        60
OIR    2025250     91400   21.0700 -109.2300       8.8        37       104        60
OIR    2025250     91400   21.0700 -109.2400       8.7        37       105        60
OIR    2025250     91400   21.0700 -109.2500       8.7        37       107        60
OIR    2025250     91400   21.0700 -109.2600       8.7        37       107        60
OIR    2025250     91400   21.0700 -109.2700       8.6        37       107        60
OIR    2025250     91400   21.0700 -109.2800       8.6        36       107        60
OIR    2025250     91400   21.0700 -109.2900       8.6        36       108        60
OIR    2025250     91400   21.0700 -109.3000       8.5        36       108        60
OIR    2025250     91400   21.0700 -109.3100       8.5        36       107        60
OIR    2025250     91400   21.0700 -109.3200       8.4        36       105        60
OIR    2025250     91400   21.0700 -109.3300       8.3        35       105        60
OIR    2025250     91400   21.0700 -109.3400       8.2        35       107        60
OIR    2025250     91400   21.0700 -109.3500       8.1        35       107        60
OIR    2025250     91400   21.0700 -109.3600       8.0        35       105        60
OIR    2025250     91400   21.0700 -109.3700       7.8        35       105        60
OIR    2025250     91400   21.0700 -109.3800       7.7        35       105        60
OIR    2025250     91400   21.0700 -109.3900       7.5        35       105        60
OIR    2025250     91400   21.0700 -109.4000       7.2        35       105        60
OIR    2025250     91400   21.0700 -109.4100       6.6        34       107        60
OIR    2025250     91400   21.0700 -109.4200       6.0        34       108        60
OIR    2025250     91400   21.0700 -109.4300       5.5        33       108        60
OIR    2025250     91400   21.0700 -109.4400       5.1        32       109        60
OIR    2025250     91400   21.0700 -109.4500       4.8        31       109        60
OIR    2025250     91400   21.0700 -109.4600       4.6        31       109        60
OIR    2025250     91400   21.0700 -109.4700       4.4        30       110        60
OIR    2025250     91400   21.0700 -109.4800       4.2        30       108        60
OIR    2025250     91400   21.0700 -109.4900       4.1        29       105        60
OIR    2025250     91400   21.0700 -109.5000       4.0        29       104        60
OIR    2025250     91400   21.0600 -108.9700      12.1        57       137        60
OIR    2025250     91400   21.0600 -108.9800      12.2        60       131        60
OIR    2025250     91400   21.0600 -108.9900      12.7        61       127        60
OIR    2025250     91400   21.0600 -109.0000      12.6        61       123        60
OIR    2025250     91400   21.0600 -109.0100      12.4        60       119        60
OIR    2025250     91400   21.0600 -109.0200      10.5        50       116        60
OIR    2025250     91400   21.0600 -109.0300       9.9        44       114        60
OIR    2025250     91400   21.0600 -109.0400       9.6        42       113        60
OIR    2025250     91400   21.0600 -109.0500       9.5        42       112        60
OIR    2025250     91400   21.0600 -109.0600       9.4        41       111        60
OIR    2025250     91400   21.0600 -109.0700       9.4        41       110        60
OIR    2025250     91400   21.0600 -109.0800       9.3        41       110        60
OIR    2025250     91400   21.0600 -109.0900       9.3        40       109        60
OIR    2025250     91400   21.0600 -109.1000       9.3        40       109        60
OIR    2025250     91400   21.0600 -109.1100       9.2        40       109        60
OIR    2025250     91400   21.0600 -109.1200       9.2        39       109        60
OIR    2025250     91400   21.0600 -109.1300       9.1        39       109        60
OIR    2025250     91400   21.0600 -109.1400       9.1        39       108        60
OIR    2025250     91400   21.0600 -109.1500       9.1        39       108        60
OIR    2025250     91400   21.0600 -109.1600       9.0        39       109        60
OIR    2025250     91400   21.0600 -109.1700       9.0        38       109        60
OIR    2025250     91400   21.0600 -109.1800       9.0        38       110        60
OIR    2025250     91400   21.0600 -109.1900       9.0        38       110        60
OIR    2025250     91400   21.0600 -109.2000       8.9        38       110        60
OIR    2025250     91400   21.0600 -109.2100       8.9        38       108        60
OIR    2025250     91400   21.0600 -109.2200       8.9        38       105        60
OIR    2025250     91400   21.0600 -109.2300       8.8        37       104        60
OIR    2025250     91400   21.0600 -109.2400       8.7        37       104        60
OIR    2025250     91400   21.0600 -109.2500       8.7        37       104        60
OIR    2025250     91400   21.0600 -109.2600       8.7        37       105        60
OIR    2025250     91400   21.0600 -109.2700       8.7        36       105        60
OIR    2025250     91400   21.0600 -109.2800       8.6        36       105        60
OIR    2025250     91400   21.0600 -109.2900       8.6        36       105        60
OIR    2025250     91400   21.0600 -109.3000       8.6        36       105        60
OIR    2025250     91400   21.0600 -109.3100       8.5        36       105        60
OIR    2025250     91400   21.0600 -109.3200       8.4        36       105        60
OIR    2025250     91400   21.0600 -109.3300       8.4        35       105        60
OIR    2025250     91400   21.0600 -109.3400       8.3        35       105        60
OIR    2025250     91400   21.0600 -109.3500       8.2        35       107        60
OIR    2025250     91400   21.0600 -109.3600       8.0        35       105        60
OIR    2025250     91400   21.0600 -109.3700       7.9        35       105        60
OIR    2025250     91400   21.0600 -109.3800       7.8        35       105        60
OIR    2025250     91400   21.0600 -109.3900       7.6        35       105        60
OIR    2025250     91400   21.0600 -109.4000       7.4        34       105        60
OIR    2025250     91400   21.0600 -109.4100       7.0        34       107        60
OIR    2025250     91400   21.0600 -109.4200       6.4        34       108        60
OIR    2025250     91400   21.0600 -109.4300       5.8        33       108        60
OIR    2025250     91400   21.0600 -109.4400       5.3        32       108        60
OIR    2025250     91400   21.0600 -109.4500       5.0        31       108        60
OIR    2025250     91400   21.0600 -109.4600       4.8        31       108        60
OIR    2025250     91400   21.0600 -109.4700       4.6        30       109        60
OIR    2025250     91400   21.0600 -109.4800       4.4        30       107        60
OIR    2025250     91400   21.0600 -109.4900       4.2        29       105        60
OIR    2025250     91400   21.0600 -109.5000       4.1        30       104        60
OIR    2025250     91400   21.0600 -109.5100       4.0        30       104        60
OIR    2025250     91400   21.0600 -115.1600      20.0       126       142        60
OIR    2025250     91400   21.0500 -108.9700      11.6        61       138        60
OIR    2025250     91400   21.0500 -108.9800      11.8        62       131        60
OIR    2025250     91400   21.0500 -108.9900      12.3        63       126        60
OIR    2025250     91400   21.0500 -109.0000      12.3        63       122        60
OIR    2025250     91400   21.0500 -109.0100      12.1        62       117        60
OIR    2025250     91400   21.0500 -109.0200      10.2        50       116        60
OIR    2025250     91400   21.0500 -109.0300       9.7        44       114        60
OIR    2025250     91400   21.0500 -109.0400       9.6        42       112        60
OIR    2025250     91400   21.0500 -109.0500       9.5        42       111        60
OIR    2025250     91400   21.0500 -109.0600       9.4        41       110        60
OIR    2025250     91400   21.0500 -109.0700       9.4        41       109        60
OIR    2025250     91400   21.0500 -109.0800       9.3        40       109        60
OIR    2025250     91400   21.0500 -109.0900       9.3        40       109        60
OIR    2025250     91400   21.0500 -109.1000       9.3        40       109        60
OIR    2025250     91400   21.0500 -109.1100       9.2        40       109        60
OIR    2025250     91400   21.0500 -109.1200       9.2        39       109        60
OIR    2025250     91400   21.0500 -109.1300       9.2        39       109        60
OIR    2025250     91400   21.0500 -109.1400       9.1        39       108        60
OIR    2025250     91400   21.0500 -109.1500       9.1        39       108        60
OIR    2025250     91400   21.0500 -109.1600       9.0        38       108        60
OIR    2025250     91400   21.0500 -109.1700       9.0        38       109        60
OIR    2025250     91400   21.0500 -109.1800       9.0        38       110        60
OIR    2025250     91400   21.0500 -109.1900       9.0        38       110        60
OIR    2025250     91400   21.0500 -109.2000       8.9        38       110        60
OIR    2025250     91400   21.0500 -109.2100       8.9        38       108        60
OIR    2025250     91400   21.0500 -109.2200       8.9        38       107        60
OIR    2025250     91400   21.0500 -109.2300       8.8        37       104        60
OIR    2025250     91400   21.0500 -109.2400       8.8        37       104        60
OIR    2025250     91400   21.0500 -109.2500       8.7        37       104        60
OIR    2025250     91400   21.0500 -109.2600       8.7        36       104        60
OIR    2025250     91400   21.0500 -109.2700       8.7        36       104        60
OIR    2025250     91400   21.0500 -109.2800       8.7        36       104        60
OIR    2025250     91400   21.0500 -109.2900       8.6        36       104        60
OIR    2025250     91400   21.0500 -109.3000       8.6        36       104        60
OIR    2025250     91400   21.0500 -109.3100       8.6        36       104        60
OIR    2025250     91400   21.0500 -109.3200       8.5        36       104        60
OIR    2025250     91400   21.0500 -109.3300       8.4        35       104        60
OIR    2025250     91400   21.0500 -109.3400       8.3        35       105        60
OIR    2025250     91400   21.0500 -109.3500       8.2        35       105        60
OIR    2025250     91400   21.0500 -109.3600       8.1        35       105        60
OIR    2025250     91400   21.0500 -109.3700       8.0        35       105        60
OIR    2025250     91400   21.0500 -109.3800       7.9        35       105        60
OIR    2025250     91400   21.0500 -109.3900       7.7        35       105        60
OIR    2025250     91400   21.0500 -109.4000       7.5        34       107        60
OIR    2025250     91400   21.0500 -109.4100       7.2        34       107        60
OIR    2025250     91400   21.0500 -109.4200       6.8        33       108        60
OIR    2025250     91400   21.0500 -109.4300       6.2        32       108        60
OIR    2025250     91400   21.0500 -109.4400       5.6        32       108        60
OIR    2025250     91400   21.0500 -109.4500       5.2        31       108        60
OIR    2025250     91400   21.0500 -109.4600       5.0        31       107        60
OIR    2025250     91400   21.0500 -109.4700       4.8        31       107        60
OIR    2025250     91400   21.0500 -109.4800       4.5        30       107        60
OIR    2025250     91400   21.0500 -109.4900       4.2        30       105        60
OIR    2025250     91400   21.0500 -109.5000       4.1        30       104        60
OIR    2025250     91400   21.0500 -109.5100       4.0        30       104        60
OIR    2025250     91400   21.0500 -109.5200       4.0        31       104        60
OIR    2025250     91400   21.0400 -108.9700      11.3        65       140        60
OIR    2025250     91400   21.0400 -108.9800      11.4        66       132        60
OIR    2025250     91400   21.0400 -108.9900      11.6        66       126        60
OIR    2025250     91400   21.0400 -109.0000      11.8        65       122        60
OIR    2025250     91400   21.0400 -109.0100      11.4        60       117        60
OIR    2025250     91400   21.0400 -109.0200      10.1        48       116        60
OIR    2025250     91400   21.0400 -109.0300       9.6        43       114        60
OIR    2025250     91400   21.0400 -109.0400       9.5        42       112        60
OIR    2025250     91400   21.0400 -109.0500       9.5        42       111        60
OIR    2025250     91400   21.0400 -109.0600       9.4        41       109        60
OIR    2025250     91400   21.0400 -109.0700       9.4        41       109        60
OIR    2025250     91400   21.0400 -109.0800       9.3        40       108        60
OIR    2025250     91400   21.0400 -109.0900       9.3        40       108        60
OIR    2025250     91400   21.0400 -109.1000       9.3        40       109        60
OIR    2025250     91400   21.0400 -109.1100       9.2        40       109        60
OIR    2025250     91400   21.0400 -109.1200       9.2        39       109        60
OIR    2025250     91400   21.0400 -109.1300       9.2        39       109        60
OIR    2025250     91400   21.0400 -109.1400       9.1        39       108        60
OIR    2025250     91400   21.0400 -109.1500       9.1        39       107        60
OIR    2025250     91400   21.0400 -109.1600       9.1        38       107        60
OIR    2025250     91400   21.0400 -109.1700       9.0        38       108        60
OIR    2025250     91400   21.0400 -109.1800       9.0        38       109        60
OIR    2025250     91400   21.0400 -109.1900       9.0        38       109        60
OIR    2025250     91400   21.0400 -109.2000       8.9        38       109        60
OIR    2025250     91400   21.0400 -109.2100       8.9        38       108        60
OIR    2025250     91400   21.0400 -109.2200       8.9        37       107        60
OIR    2025250     91400   21.0400 -109.2300       8.8        37       105        60
OIR    2025250     91400   21.0400 -109.2400       8.8        37       105        60
OIR    2025250     91400   21.0400 -109.2500       8.8        37       104        60
OIR    2025250     91400   21.0400 -109.2600       8.7        36       104        60
OIR    2025250     91400   21.0400 -109.2700       8.7        36       104        60
OIR    2025250     91400   21.0400 -109.2800       8.7        36       104        60
OIR    2025250     91400   21.0400 -109.2900       8.7        36       104        60
OIR    2025250     91400   21.0400 -109.3000       8.6        36       104        60
OIR    2025250     91400   21.0400 -109.3100       8.6        36       104        60
OIR    2025250     91400   21.0400 -109.3200       8.5        36       104        60
OIR    2025250     91400   21.0400 -109.3300       8.5        35       104        60
OIR    2025250     91400   21.0400 -109.3400       8.4        35       104        60
OIR    2025250     91400   21.0400 -109.3500       8.3        35       105        60
OIR    2025250     91400   21.0400 -109.3600       8.2        35       107        60
OIR    2025250     91400   21.0400 -109.3700       8.1        35       105        60
OIR    2025250     91400   21.0400 -109.3800       8.0        35       105        60
OIR    2025250     91400   21.0400 -109.3900       7.8        34       107        60
OIR    2025250     91400   21.0400 -109.4000       7.7        34       107        60
OIR    2025250     91400   21.0400 -109.4100       7.5        34       108        60
OIR    2025250     91400   21.0400 -109.4200       7.1        33       108        60
OIR    2025250     91400   21.0400 -109.4300       6.6        32       108        60
OIR    2025250     91400   21.0400 -109.4400       6.0        32       107        60
OIR    2025250     91400   21.0400 -109.4500       5.5        31       107        60
OIR    2025250     91400   21.0400 -109.4600       5.2        31       107        60
OIR    2025250     91400   21.0400 -109.4700       5.0        31       107        60
OIR    2025250     91400   21.0400 -109.4800       4.8        31       107        60
OIR    2025250     91400   21.0400 -109.4900       4.4        30       105        60
OIR    2025250     91400   21.0400 -109.5000       4.2        30       104        60
OIR    2025250     91400   21.0400 -109.5100       4.1        31       104        60
OIR    2025250     91400   21.0400 -109.5200       4.0        31       104        60
OIR    2025250     91400   21.0400 -109.5300       4.0        32       104        60
OIR    2025250     91400   21.0400 -109.6200       4.0        26       109        60
OIR    2025250     91400   21.0400 -109.6300       4.1        25       109        60
OIR    2025250     91400   21.0400 -109.6400       4.1        24       108        60
OIR    2025250     91400   21.0400 -109.6500       4.2        23       108        60
OIR    2025250     91400   21.0400 -109.6600       4.3        23       109        60
OIR    2025250     91400   21.0400 -109.6700       4.3        22       110        60
OIR    2025250     91400   21.0400 -109.6800       4.1        22       111        60
OIR    2025250     91400   21.0300 -108.9800      11.1        67       133        60
OIR    2025250     91400   21.0300 -108.9900      10.9        67       127        60
OIR    2025250     91400   21.0300 -109.0000      10.7        65       123        60
OIR    2025250     91400   21.0300 -109.0100      10.4        58       119        60
OIR    2025250     91400   21.0300 -109.0200       9.8        45       116        60
OIR    2025250     91400   21.0300 -109.0300       9.6        43       114        60
OIR    2025250     91400   21.0300 -109.0400       9.5        42       112        60
OIR    2025250     91400   21.0300 -109.0500       9.5        42       110        60
OIR    2025250     91400   21.0300 -109.0600       9.4        41       109        60
OIR    2025250     91400   21.0300 -109.0700       9.3        41       109        60
OIR    2025250     91400   21.0300 -109.0800       9.3        40       109        60
OIR    2025250     91400   21.0300 -109.0900       9.3        40       109        60
OIR    2025250     91400   21.0300 -109.1000       9.3        40       108        60
OIR    2025250     91400   21.0300 -109.1100       9.2        40       108        60
OIR    2025250     91400   21.0300 -109.1200       9.2        39       108        60
OIR    2025250     91400   21.0300 -109.1300       9.2        39       108        60
OIR    2025250     91400   21.0300 -109.1400       9.1        39       108        60
OIR    2025250     91400   21.0300 -109.1500       9.1        38       108        60
OIR    2025250     91400   21.0300 -109.1600       9.1        38       107        60
OIR    2025250     91400   21.0300 -109.1700       9.0        38       108        60
OIR    2025250     91400   21.0300 -109.1800       9.0        38       109        60
OIR    2025250     91400   21.0300 -109.1900       9.0        38       109        60
OIR    2025250     91400   21.0300 -109.2000       9.0        38       108        60
OIR    2025250     91400   21.0300 -109.2100       8.9        38       108        60
OIR    2025250     91400   21.0300 -109.2200       8.9        37       108        60
OIR    2025250     91400   21.0300 -109.2300       8.8        37       107        60
OIR    2025250     91400   21.0300 -109.2400       8.8        37       107        60
OIR    2025250     91400   21.0300 -109.2500       8.8        36       105        60
OIR    2025250     91400   21.0300 -109.2600       8.8        36       105        60
OIR    2025250     91400   21.0300 -109.2700       8.7        36       104        60
OIR    2025250     91400   21.0300 -109.2800       8.7        36       104        60
OIR    2025250     91400   21.0300 -109.2900       8.7        36       104        60
OIR    2025250     91400   21.0300 -109.3000       8.7        36       104        60
OIR    2025250     91400   21.0300 -109.3100       8.6        36       103        60
OIR    2025250     91400   21.0300 -109.3200       8.6        36       103        60
OIR    2025250     91400   21.0300 -109.3300       8.5        35       104        60
OIR    2025250     91400   21.0300 -109.3400       8.4        35       104        60
OIR    2025250     91400   21.0300 -109.3500       8.3        35       104        60
OIR    2025250     91400   21.0300 -109.3600       8.2        35       105        60
OIR    2025250     91400   21.0300 -109.3700       8.1        35       107        60
OIR    2025250     91400   21.0300 -109.3800       8.0        34       107        60
OIR    2025250     91400   21.0300 -109.3900       7.9        34       107        60
OIR    2025250     91400   21.0300 -109.4000       7.8        34       108        60
OIR    2025250     91400   21.0300 -109.4100       7.7        34       108        60
OIR    2025250     91400   21.0300 -109.4200       7.4        33       108        60
OIR    2025250     91400   21.0300 -109.4300       7.0        33       107        60
OIR    2025250     91400   21.0300 -109.4400       6.5        32       107        60
OIR    2025250     91400   21.0300 -109.4500       5.9        31       107        60
OIR    2025250     91400   21.0300 -109.4600       5.5        31       107        60
OIR    2025250     91400   21.0300 -109.4700       5.2        31       107        60
OIR    2025250     91400   21.0300 -109.4800       5.0        31       107        60
OIR    2025250     91400   21.0300 -109.4900       4.8        31       107        60
OIR    2025250     91400   21.0300 -109.5000       4.4        31       107        60
OIR    2025250     91400   21.0300 -109.5100       4.2        31       105        60
OIR    2025250     91400   21.0300 -109.5200       4.1        32       105        60
OIR    2025250     91400   21.0300 -109.5300       4.0        33       105        60
OIR    2025250     91400   21.0300 -109.6100       4.2        25       109        60
OIR    2025250     91400   21.0300 -109.6200       4.4        24       110        60
OIR    2025250     91400   21.0300 -109.6300       4.6        23       110        60
OIR    2025250     91400   21.0300 -109.6400       4.7        22       109        60
OIR    2025250     91400   21.0300 -109.6500       4.7        22       109        60
OIR    2025250     91400   21.0300 -109.6600       4.7        22       109        60
OIR    2025250     91400   21.0300 -109.6700       4.7        21       109        60
OIR    2025250     91400   21.0300 -109.6800       4.5        21       109        60
OIR    2025250     91400   21.0300 -109.6900       4.2        20       109        60
OIR    2025250     91400   21.0200 -108.9800      11.1        66       136        60
OIR    2025250     91400   21.0200 -108.9900      10.2        66       127        60
OIR    2025250     91400   21.0200 -109.0000      10.0        64       124        60
OIR    2025250     91400   21.0200 -109.0100       9.8        56       120        60
OIR    2025250     91400   21.0200 -109.0200       9.7        45       116        60
OIR    2025250     91400   21.0200 -109.0300       9.6        43       113        60
OIR    2025250     91400   21.0200 -109.0400       9.5        43       111        60
OIR    2025250     91400   21.0200 -109.0500       9.4        42       110        60
OIR    2025250     91400   21.0200 -109.0600       9.3        41       109        60
OIR    2025250     91400   21.0200 -109.0700       9.3        41       109        60
OIR    2025250     91400   21.0200 -109.0800       9.3        40       109        60
OIR    2025250     91400   21.0200 -109.0900       9.3        40       109        60
OIR    2025250     91400   21.0200 -109.1000       9.3        40       108        60
OIR    2025250     91400   21.0200 -109.1100       9.2        40       107        60
OIR    2025250     91400   21.0200 -109.1200       9.2        39       107        60
OIR    2025250     91400   21.0200 -109.1300       9.2        39       107        60
OIR    2025250     91400   21.0200 -109.1400       9.1        39       107        60
OIR    2025250     91400   21.0200 -109.1500       9.1        38       108        60
OIR    2025250     91400   21.0200 -109.1600       9.1        38       109        60
OIR    2025250     91400   21.0200 -109.1700       9.0        38       109        60
OIR    2025250     91400   21.0200 -109.1800       9.0        38       109        60
OIR    2025250     91400   21.0200 -109.1900       9.0        38       108        60
OIR    2025250     91400   21.0200 -109.2000       9.0        38       108        60
OIR    2025250     91400   21.0200 -109.2100       8.9        37       108        60
OIR    2025250     91400   21.0200 -109.2200       8.9        37       108        60
OIR    2025250     91400   21.0200 -109.2300       8.9        37       107        60
OIR    2025250     91400   21.0200 -109.2400       8.8        37       107        60
OIR    2025250     91400   21.0200 -109.2500       8.8        36       105        60
OIR    2025250     91400   21.0200 -109.2600       8.8        36       105        60
OIR    2025250     91400   21.0200 -109.2700       8.7        36       105        60
OIR    2025250     91400   21.0200 -109.2800       8.7        36       104        60
OIR    2025250     91400   21.0200 -109.2900       8.7        36       104        60
OIR    2025250     91400   21.0200 -109.3000       8.7        36       104        60
OIR    2025250     91400   21.0200 -109.3100       8.7        36       104        60
OIR    2025250     91400   21.0200 -109.3200       8.6        36       104        60
OIR    2025250     91400   21.0200 -109.3300       8.6        35       104        60
OIR    2025250     91400   21.0200 -109.3400       8.5        35       104        60
OIR    2025250     91400   21.0200 -109.3500       8.4        35       104        60
OIR    2025250     91400   21.0200 -109.3600       8.3        35       105        60
OIR    2025250     91400   21.0200 -109.3700       8.2        35       107        60
OIR    2025250     91400   21.0200 -109.3800       8.1        34       107        60
OIR    2025250     91400   21.0200 -109.3900       8.0        34       108        60
OIR    2025250     91400   21.0200 -109.4000       7.9        34       109        60
OIR    2025250     91400   21.0200 -109.4100       7.8        33       109        60
OIR    2025250     91400   21.0200 -109.4200       7.6        33       109        60
OIR    2025250     91400   21.0200 -109.4300       7.4        33       108        60
OIR    2025250     91400   21.0200 -109.4400       7.0        32       107        60
OIR    2025250     91400   21.0200 -109.4500       6.4        31       107        60
OIR    2025250     91400   21.0200 -109.4600       5.9        31       107        60
OIR    2025250     91400   21.0200 -109.4700       5.5        31       107        60
OIR    2025250     91400   21.0200 -109.4800       5.3        31       107        60
OIR    2025250     91400   21.0200 -109.4900       5.1        31       105        60
OIR    2025250     91400   21.0200 -109.5000       4.8        31       105        60
OIR    2025250     91400   21.0200 -109.5100       4.5        32       105        60
OIR    2025250     91400   21.0200 -109.5200       4.3        33       107        60
OIR    2025250     91400   21.0200 -109.5300       4.2        33       107        60
OIR    2025250     91400   21.0200 -109.5400       4.1        34       108        60
OIR    2025250     91400   21.0200 -109.5500       4.0        33       108        60
OIR    2025250     91400   21.0200 -109.5600       4.0        32       109        60
OIR    2025250     91400   21.0200 -109.5700       4.0        31       108        60
OIR    2025250     91400   21.0200 -109.5800       4.1        30       108        60
OIR    2025250     91400   21.0200 -109.5900       4.2        28       108        60
OIR    2025250     91400   21.0200 -109.6000       4.4        26       109        60
OIR    2025250     91400   21.0200 -109.6100       4.7        24       110        60
OIR    2025250     91400   21.0200 -109.6200       4.9        22       110        60
OIR    2025250     91400   21.0200 -109.6300       5.1        21       110        60
OIR    2025250     91400   21.0200 -109.6400       5.1        21       110        60
OIR    2025250     91400   21.0200 -109.6500       5.1        21       110        60
OIR    2025250     91400   21.0200 -109.6600       5.1        21       109        60
OIR    2025250     91400   21.0200 -109.6700       5.0        21       109        60
OIR    2025250     91400   21.0200 -109.6800       4.9        21       108        60
OIR    2025250     91400   21.0200 -109.6900       4.6        21       108        60
OIR    2025250     91400   21.0200 -109.7000       4.2        20       108        60
OIR    2025250     91400   21.0200 -109.7100       4.1        19       108        60
OIR    2025250     91400   21.0200 -109.7200       4.0        18       108        60
OIR    2025250     91400   21.0200 -109.7300       4.0        17       108        60
OIR    2025250     91400   21.0200 -109.7400       4.0        17       107        60
OIR    2025250     91400   21.0100 -108.9800      10.9        65       138        60
OIR    2025250     91400   21.0100 -108.9900      10.3        66       130        60
OIR    2025250     91400   21.0100 -109.0000      10.1        64       125        60
OIR    2025250     91400   21.0100 -109.0100       9.8        55       120        60
OIR    2025250     91400   21.0100 -109.0200       9.8        47       116        60
OIR    2025250     91400   21.0100 -109.0300       9.6        44       112        60
OIR    2025250     91400   21.0100 -109.0400       9.5        42       109        60
OIR    2025250     91400   21.0100 -109.0500       9.4        41       108        60
OIR    2025250     91400   21.0100 -109.0600       9.3        41       107        60
OIR    2025250     91400   21.0100 -109.0700       9.3        41       105        60
OIR    2025250     91400   21.0100 -109.0800       9.3        40       105        60
OIR    2025250     91400   21.0100 -109.0900       9.3        40       107        60
OIR    2025250     91400   21.0100 -109.1000       9.3        40       105        60
OIR    2025250     91400   21.0100 -109.1100       9.2        39       104        60
OIR    2025250     91400   21.0100 -109.1200       9.2        39       104        60
OIR    2025250     91400   21.0100 -109.1300       9.2        39       104        60
OIR    2025250     91400   21.0100 -109.1400       9.1        39       104        60
OIR    2025250     91400   21.0100 -109.1500       9.1        38       105        60
OIR    2025250     91400   21.0100 -109.1600       9.1        38       108        60
OIR    2025250     91400   21.0100 -109.1700       9.0        38       108        60
OIR    2025250     91400   21.0100 -109.1800       9.0        38       107        60
OIR    2025250     91400   21.0100 -109.1900       9.0        38       107        60
OIR    2025250     91400   21.0100 -109.2000       9.0        37       107        60
OIR    2025250     91400   21.0100 -109.2100       8.9        37       107        60
OIR    2025250     91400   21.0100 -109.2200       8.9        37       107        60
OIR    2025250     91400   21.0100 -109.2300       8.9        37       107        60
OIR    2025250     91400   21.0100 -109.2400       8.8        36       107        60
OIR    2025250     91400   21.0100 -109.2500       8.8        36       105        60
OIR    2025250     91400   21.0100 -109.2600       8.8        36       105        60
OIR    2025250     91400   21.0100 -109.2700       8.8        36       105        60
OIR    2025250     91400   21.0100 -109.2800       8.7        36       104        60
OIR    2025250     91400   21.0100 -109.2900       8.7        36       104        60
OIR    2025250     91400   21.0100 -109.3000       8.7        36       104        60
OIR    2025250     91400   21.0100 -109.3100       8.7        36       104        60
OIR    2025250     91400   21.0100 -109.3200       8.7        36       104        60
OIR    2025250     91400   21.0100 -109.3300       8.6        35       104        60
OIR    2025250     91400   21.0100 -109.3400       8.5        35       104        60
OIR    2025250     91400   21.0100 -109.3500       8.5        35       104        60
OIR    2025250     91400   21.0100 -109.3600       8.4        35       105        60
OIR    2025250     91400   21.0100 -109.3700       8.3        34       107        60
OIR    2025250     91400   21.0100 -109.3800       8.2        34       107        60
OIR    2025250     91400   21.0100 -109.3900       8.1        34       108        60
OIR    2025250     91400   21.0100 -109.4000       8.0        34       109        60
OIR    2025250     91400   21.0100 -109.4100       7.9        33       110        60
OIR    2025250     91400   21.0100 -109.4200       7.8        33       111        60
OIR    2025250     91400   21.0100 -109.4300       7.6        33       109        60
OIR    2025250     91400   21.0100 -109.4400       7.3        33       108        60
OIR    2025250     91400   21.0100 -109.4500       6.9        32       107        60
OIR    2025250     91400   21.0100 -109.4600       6.4        32       107        60
OIR    2025250     91400   21.0100 -109.4700       6.0        31       107        60
OIR    2025250     91400   21.0100 -109.4800       5.6        31       105        60
OIR    2025250     91400   21.0100 -109.4900       5.5        31       104        60
OIR    2025250     91400   21.0100 -109.5000       5.3        32       104        60
OIR    2025250     91400   21.0100 -109.5100       5.2        32       105        60
OIR    2025250     91400   21.0100 -109.5200       4.9        33       105        60
OIR    2025250     91400   21.0100 -109.5300       4.8        35       107        60
OIR    2025250     91400   21.0100 -109.5400       4.6        35       108        60
OIR    2025250     91400   21.0100 -109.5500       4.4        34       109        60
OIR    2025250     91400   21.0100 -109.5600       4.4        34       110        60
OIR    2025250     91400   21.0100 -109.5700       4.5        32       110        60
OIR    2025250     91400   21.0100 -109.5800       4.6        30       110        60
OIR    2025250     91400   21.0100 -109.5900       4.7        28       110        60
OIR    2025250     91400   21.0100 -109.6000       4.8        25       111        60
OIR    2025250     91400   21.0100 -109.6100       5.1        23       111        60
OIR    2025250     91400   21.0100 -109.6200       5.2        21       111        60
OIR    2025250     91400   21.0100 -109.6300       5.3        21       109        60
OIR    2025250     91400   21.0100 -109.6400       5.3        21       108        60
OIR    2025250     91400   21.0100 -109.6500       5.3        21       108        60
OIR    2025250     91400   21.0100 -109.6600       5.3        21       108        60
OIR    2025250     91400   21.0100 -109.6700       5.2        21       108        60
OIR    2025250     91400   21.0100 -109.6800       5.2        21       108        60
OIR    2025250     91400   21.0100 -109.6900       5.0        21       108        60
OIR    2025250     91400   21.0100 -109.7000       4.7        20       108        60
OIR    2025250     91400   21.0100 -109.7100       4.4        19       109        60
OIR    2025250     91400   21.0100 -109.7200       4.3        19       108        60
OIR    2025250     91400   21.0100 -109.7300       4.2        18       108        60
OIR    2025250     91400   21.0100 -109.7400       4.1        17       108        60
OIR    2025250     91400   21.0100 -109.7500       4.1        16       107        60
OIR    2025250     91400   21.0100 -109.7600       4.0        15       105        60
OIR    2025250     91400   21.0000 -108.9800      10.9        64       140        60
OIR    2025250     91400   21.0000 -108.9900      10.4        64       131        60
OIR    2025250     91400   21.0000 -109.0000      10.2        63       125        60
OIR    2025250     91400   21.0000 -109.0100      10.1        57       121        60
OIR    2025250     91400   21.0000 -109.0200       9.8        49       116        60
OIR    2025250     91400   21.0000 -109.0300       9.5        44       112        60
OIR    2025250     91400   21.0000 -109.0400       9.4        42       108        60
OIR    2025250     91400   21.0000 -109.0500       9.3        41       105        60
OIR    2025250     91400   21.0000 -109.0600       9.3        41       104        60
OIR    2025250     91400   21.0000 -109.0700       9.3        41       104        60
OIR    2025250     91400   21.0000 -109.0800       9.3        40       104        60
OIR    2025250     91400   21.0000 -109.0900       9.3        40       104        60
OIR    2025250     91400   21.0000 -109.1000       9.3        40       104        60
OIR    2025250     91400   21.0000 -109.1100       9.2        39       104        60
OIR    2025250     91400   21.0000 -109.1200       9.2        39       104        60
OIR    2025250     91400   21.0000 -109.1300       9.2        39       104        60
OIR    2025250     91400   21.0000 -109.1400       9.1        38       103        60
OIR    2025250     91400   21.0000 -109.1500       9.1        38       104        60
OIR    2025250     91400   21.0000 -109.1600       9.1        38       105        60
OIR    2025250     91400   21.0000 -109.1700       9.1        38       107        60
OIR    2025250     91400   21.0000 -109.1800       9.0        38       105        60
OIR    2025250     91400   21.0000 -109.1900       9.0        37       104        60
OIR    2025250     91400   21.0000 -109.2000       9.0        37       104        60
OIR    2025250     91400   21.0000 -109.2100       8.9        37       104        60
OIR    2025250     91400   21.0000 -109.2200       8.9        37       104        60
OIR    2025250     91400   21.0000 -109.2300       8.9        36       104        60
OIR    2025250     91400   21.0000 -109.2400       8.9        36       105        60
OIR    2025250     91400   21.0000 -109.2500       8.8        36       105        60
OIR    2025250     91400   21.0000 -109.2600       8.8        36       105        60
OIR    2025250     91400   21.0000 -109.2700       8.8        36       105        60
OIR    2025250     91400   21.0000 -109.2800       8.8        36       104        60
OIR    2025250     91400   21.0000 -109.2900       8.7        36       104        60
OIR    2025250     91400   21.0000 -109.3000       8.7        36       104        60
OIR    2025250     91400   21.0000 -109.3100       8.7        36       104        60
OIR    2025250     91400   21.0000 -109.3200       8.7        35       104        60
OIR    2025250     91400   21.0000 -109.3300       8.7        35       104        60
OIR    2025250     91400   21.0000 -109.3400       8.6        35       104        60
OIR    2025250     91400   21.0000 -109.3500       8.5        35       104        60
OIR    2025250     91400   21.0000 -109.3600       8.4        35       104        60
OIR    2025250     91400   21.0000 -109.3700       8.3        34       105        60
OIR    2025250     91400   21.0000 -109.3800       8.2        34       107        60
OIR    2025250     91400   21.0000 -109.3900       8.1        34       107        60
OIR    2025250     91400   21.0000 -109.4000       8.0        34       108        60
OIR    2025250     91400   21.0000 -109.4100       7.9        33       109        60
OIR    2025250     91400   21.0000 -109.4200       7.8        33       110        60
OIR    2025250     91400   21.0000 -109.4300       7.7        33       108        60
OIR    2025250     91400   21.0000 -109.4400       7.5        33       105        60
OIR    2025250     91400   21.0000 -109.4500       7.2        33       105        60
OIR    2025250     91400   21.0000 -109.4600       6.8        32       105        60
OIR    2025250     91400   21.0000 -109.4700       6.4        32       105        60
OIR    2025250     91400   21.0000 -109.4800       6.0        32       104        60
OIR    2025250     91400   21.0000 -109.4900       5.8        32       104        60
OIR    2025250     91400   21.0000 -109.5000       5.7        32       104        60
OIR    2025250     91400   21.0000 -109.5100       5.6        33       104        60
OIR    2025250     91400   21.0000 -109.5200       5.6        34       104        60
OIR    2025250     91400   21.0000 -109.5300       5.4        35       105        60
OIR    2025250     91400   21.0000 -109.5400       5.2        36       107        60
OIR    2025250     91400   21.0000 -109.5500       5.0        35       108        60
OIR    2025250     91400   21.0000 -109.5600       4.9        34       109        60
OIR    2025250     91400   21.0000 -109.5700       5.0        32       111        60
OIR    2025250     91400   21.0000 -109.5800       5.0        30       112        60
OIR    2025250     91400   21.0000 -109.5900       5.1        27       112        60
OIR    2025250     91400   21.0000 -109.6000       5.2        24       113        60
OIR    2025250     91400   21.0000 -109.6100       5.3        22       113        60
OIR    2025250     91400   21.0000 -109.6200       5.4        21       111        60
OIR    2025250     91400   21.0000 -109.6300       5.4        21       109        60
OIR    2025250     91400   21.0000 -109.6400       5.4        21       107        60
OIR    2025250     91400   21.0000 -109.6500       5.4        21       105        60
OIR    2025250     91400   21.0000 -109.6600       5.4        21       107        60
OIR    2025250     91400   21.0000 -109.6700       5.4        21       107        60
OIR    2025250     91400   21.0000 -109.6800       5.3        21       107        60
OIR    2025250     91400   21.0000 -109.6900       5.3        21       108        60
OIR    2025250     91400   21.0000 -109.7000       5.2        21       108        60
OIR    2025250     91400   21.0000 -109.7100       5.0        20       109        60
OIR    2025250     91400   21.0000 -109.7200       4.7        20       108        60
OIR    2025250     91400   21.0000 -109.7300       4.4        18       108        60
OIR    2025250     91400   21.0000 -109.7400       4.3        17       107        60
OIR    2025250     91400   21.0000 -109.7500       4.2        17       107        60
OIR    2025250     91400   21.0000 -109.7600       4.2        16       107        60
OIR    2025250     91400   21.0000 -109.7700       4.1        15       107        60
OIR    2025250     91400   21.0000 -109.7800       4.0        14       105        60
OIR    2025250     91400   21.0000 -109.7900       4.0        13       104        60
OIR    2025250     91400   20.9900 -108.9800      11.0        64       139        60
OIR    2025250     91400   20.9900 -108.9900      10.3        63       131        60
OIR    2025250     91400   20.9900 -109.0000      10.0        61       124        60
OIR    2025250     91400   20.9900 -109.0100       9.8        57       121        60
OIR    2025250     91400   20.9900 -109.0200       9.5        47       116        60
OIR    2025250     91400   20.9900 -109.0300       9.4        42       114        60
OIR    2025250     91400   20.9900 -109.0400       9.3        41       110        60
OIR    2025250     91400   20.9900 -109.0500       9.3        41       108        60
OIR    2025250     91400   20.9900 -109.0600       9.3        41       107        60
OIR    2025250     91400   20.9900 -109.0700       9.3        41       105        60
OIR    2025250     91400   20.9900 -109.0800       9.3        40       105        60
OIR    2025250     91400   20.9900 -109.0900       9.3        40       104        60
OIR    2025250     91400   20.9900 -109.1000       9.2        40       104        60
OIR    2025250     91400   20.9900 -109.1100       9.2        39       104        60
OIR    2025250     91400   20.9900 -109.1200       9.2        39       105        60
OIR    2025250     91400   20.9900 -109.1300       9.2        39       105        60
OIR    2025250     91400   20.9900 -109.1400       9.1        38       104        60
OIR    2025250     91400   20.9900 -109.1500       9.1        38       104        60
OIR    2025250     91400   20.9900 -109.1600       9.1        38       104        60
OIR    2025250     91400   20.9900 -109.1700       9.0        38       105        60
OIR    2025250     91400   20.9900 -109.1800       9.0        38       105        60
OIR    2025250     91400   20.9900 -109.1900       9.0        37       104        60
OIR    2025250     91400   20.9900 -109.2000       9.0        37       104        60
OIR    2025250     91400   20.9900 -109.2100       8.9        37       104        60
OIR    2025250     91400   20.9900 -109.2200       8.9        37       104        60
OIR    2025250     91400   20.9900 -109.2300       8.9        36       104        60
OIR    2025250     91400   20.9900 -109.2400       8.9        36       105        60
OIR    2025250     91400   20.9900 -109.2500       8.8        36       105        60
OIR    2025250     91400   20.9900 -109.2600       8.8        36       105        60
OIR    2025250     91400   20.9900 -109.2700       8.8        36       105        60
OIR    2025250     91400   20.9900 -109.2800       8.8        36       104        60
OIR    2025250     91400   20.9900 -109.2900       8.8        36       104        60
OIR    2025250     91400   20.9900 -109.3000       8.7        36       104        60
OIR    2025250     91400   20.9900 -109.3100       8.7        36       103        60
OIR    2025250     91400   20.9900 -109.3200       8.7        35       103        60
OIR    2025250     91400   20.9900 -109.3300       8.7        35       103        60
OIR    2025250     91400   20.9900 -109.3400       8.7        35       103        60
OIR    2025250     91400   20.9900 -109.3500       8.6        35       104        60
OIR    2025250     91400   20.9900 -109.3600       8.5        35       104        60
OIR    2025250     91400   20.9900 -109.3700       8.4        34       105        60
OIR    2025250     91400   20.9900 -109.3800       8.3        34       105        60
OIR    2025250     91400   20.9900 -109.3900       8.2        34       107        60
OIR    2025250     91400   20.9900 -109.4000       8.1        34       107        60
OIR    2025250     91400   20.9900 -109.4100       8.0        33       108        60
OIR    2025250     91400   20.9900 -109.4200       7.9        33       109        60
OIR    2025250     91400   20.9900 -109.4300       7.8        33       107        60
OIR    2025250     91400   20.9900 -109.4400       7.7        33       104        60
OIR    2025250     91400   20.9900 -109.4500       7.5        33       104        60
OIR    2025250     91400   20.9900 -109.4600       7.2        33       104        60
OIR    2025250     91400   20.9900 -109.4700       6.9        33       104        60
OIR    2025250     91400   20.9900 -109.4800       6.5        32       104        60
OIR    2025250     91400   20.9900 -109.4900       6.2        32       103        60
OIR    2025250     91400   20.9900 -109.5000       6.1        32       103        60
OIR    2025250     91400   20.9900 -109.5100       6.0        33       104        60
OIR    2025250     91400   20.9900 -109.5200       6.1        34       104        60
OIR    2025250     91400   20.9900 -109.5300       6.2        35       104        60
OIR    2025250     91400   20.9900 -109.5400       6.2        35       104        60
OIR    2025250     91400   20.9900 -109.5500       5.9        35       105        60
OIR    2025250     91400   20.9900 -109.5600       5.7        34       108        60
OIR    2025250     91400   20.9900 -109.5700       5.6        33       110        60
OIR    2025250     91400   20.9900 -109.5800       5.6        30       111        60
OIR    2025250     91400   20.9900 -109.5900       5.5        28       112        60
OIR    2025250     91400   20.9900 -109.6000       5.4        23       112        60
OIR    2025250     91400   20.9900 -109.6100       5.5        21       111        60
OIR    2025250     91400   20.9900 -109.6200       5.5        21       110        60
OIR    2025250     91400   20.9900 -109.6300       5.5        21       108        60
OIR    2025250     91400   20.9900 -109.6400       5.4        21       105        60
OIR    2025250     91400   20.9900 -109.6500       5.4        21       104        60
OIR    2025250     91400   20.9900 -109.6600       5.4        21       104        60
OIR    2025250     91400   20.9900 -109.6700       5.4        21       104        60
OIR    2025250     91400   20.9900 -109.6800       5.4        21       104        60
OIR    2025250     91400   20.9900 -109.6900       5.4        21       105        60
OIR    2025250     91400   20.9900 -109.7000       5.4        21       105        60
OIR    2025250     91400   20.9900 -109.7100       5.3        21       107        60
OIR    2025250     91400   20.9900 -109.7200       5.1        21       107        60
OIR    2025250     91400   20.9900 -109.7300       4.8        19       105        60
OIR    2025250     91400   20.9900 -109.7400       4.6        18       105        60
OIR    2025250     91400   20.9900 -109.7500       4.4        17       105        60
OIR    2025250     91400   20.9900 -109.7600       4.3        16       107        60
OIR    2025250     91400   20.9900 -109.7700       4.2        15       107        60
OIR    2025250     91400   20.9900 -109.7800       4.1        15       105        60
OIR    2025250     91400   20.9900 -109.7900       4.1        14       104        60
OIR    2025250     91400   20.9900 -109.8000       4.0        13       104        60
OIR    2025250     91400   20.9800 -108.9800      10.9        64       137        60
OIR    2025250     91400   20.9800 -108.9900      10.2        62       130        60
OIR    2025250     91400   20.9800 -109.0000       9.8        59       123        60
OIR    2025250     91400   20.9800 -109.0100       9.6        55       120        60
OIR    2025250     91400   20.9800 -109.0200       9.3        44       116        60
OIR    2025250     91400   20.9800 -109.0300       9.3        42       115        60
OIR    2025250     91400   20.9800 -109.0400       9.3        41       112        60
OIR    2025250     91400   20.9800 -109.0500       9.3        41       110        60
OIR    2025250     91400   20.9800 -109.0600       9.3        41       109        60
OIR    2025250     91400   20.9800 -109.0700       9.3        41       108        60
OIR    2025250     91400   20.9800 -109.0800       9.3        40       107        60
OIR    2025250     91400   20.9800 -109.0900       9.3        40       107        60
OIR    2025250     91400   20.9800 -109.1000       9.2        39       107        60
OIR    2025250     91400   20.9800 -109.1100       9.2        39       108        60
OIR    2025250     91400   20.9800 -109.1200       9.2        39       109        60
OIR    2025250     91400   20.9800 -109.1300       9.1        39       109        60
OIR    2025250     91400   20.9800 -109.1400       9.1        38       108        60
OIR    2025250     91400   20.9800 -109.1500       9.1        38       107        60
OIR    2025250     91400   20.9800 -109.1600       9.1        38       105        60
OIR    2025250     91400   20.9800 -109.1700       9.0        38       104        60
OIR    2025250     91400   20.9800 -109.1800       9.0        37       105        60
OIR    2025250     91400   20.9800 -109.1900       9.0        37       107        60
OIR    2025250     91400   20.9800 -109.2000       9.0        37       108        60
OIR    2025250     91400   20.9800 -109.2100       8.9        37       108        60
OIR    2025250     91400   20.9800 -109.2200       8.9        36       107        60
OIR    2025250     91400   20.9800 -109.2300       8.9        36       108        60
OIR    2025250     91400   20.9800 -109.2400       8.9        36       108        60
OIR    2025250     91400   20.9800 -109.2500       8.9        36       109        60
OIR    2025250     91400   20.9800 -109.2600       8.8        36       108        60
OIR    2025250     91400   20.9800 -109.2700       8.8        36       108        60
OIR    2025250     91400   20.9800 -109.2800       8.8        36       107        60
OIR    2025250     91400   20.9800 -109.2900       8.8        36       105        60
OIR    2025250     91400   20.9800 -109.3000       8.8        36       105        60
OIR    2025250     91400   20.9800 -109.3100       8.8        35       105        60
OIR    2025250     91400   20.9800 -109.3200       8.7        35       105        60
OIR    2025250     91400   20.9800 -109.3300       8.7        35       105        60
OIR    2025250     91400   20.9800 -109.3400       8.7        35       105        60
OIR    2025250     91400   20.9800 -109.3500       8.6        35       107        60
OIR    2025250     91400   20.9800 -109.3600       8.6        35       107        60
OIR    2025250     91400   20.9800 -109.3700       8.5        35       107        60
OIR    2025250     91400   20.9800 -109.3800       8.4        34       108        60
OIR    2025250     91400   20.9800 -109.3900       8.3        34       108        60
OIR    2025250     91400   20.9800 -109.4000       8.2        34       108        60
OIR    2025250     91400   20.9800 -109.4100       8.0        33       108        60
OIR    2025250     91400   20.9800 -109.4200       8.0        33       108        60
OIR    2025250     91400   20.9800 -109.4300       7.9        33       107        60
OIR    2025250     91400   20.9800 -109.4400       7.8        33       104        60
OIR    2025250     91400   20.9800 -109.4500       7.7        33       104        60
OIR    2025250     91400   20.9800 -109.4600       7.5        33       104        60
OIR    2025250     91400   20.9800 -109.4700       7.2        33       104        60
OIR    2025250     91400   20.9800 -109.4800       7.0        33       104        60
OIR    2025250     91400   20.9800 -109.4900       6.7        33       104        60
OIR    2025250     91400   20.9800 -109.5000       6.6        33       103        60
OIR    2025250     91400   20.9800 -109.5100       6.6        33       103        60
OIR    2025250     91400   20.9800 -109.5200       6.7        34       103        60
OIR    2025250     91400   20.9800 -109.5300       6.8        34       103        60
OIR    2025250     91400   20.9800 -109.5400       6.9        34       103        60
OIR    2025250     91400   20.9800 -109.5500       7.0        34       104        60
OIR    2025250     91400   20.9800 -109.5600       7.0        34       105        60
OIR    2025250     91400   20.9800 -109.5700       6.8        34       109        60
OIR    2025250     91400   20.9800 -109.5800       6.5        32       110        60
OIR    2025250     91400   20.9800 -109.5900       6.1        30       111        60
OIR    2025250     91400   20.9800 -109.6000       5.6        22       112        60
OIR    2025250     91400   20.9800 -109.6100       5.6        21       110        60
OIR    2025250     91400   20.9800 -109.6200       5.6        21       108        60
OIR    2025250     91400   20.9800 -109.6300       5.6        21       105        60
OIR    2025250     91400   20.9800 -109.6400       5.5        21       104        60
OIR    2025250     91400   20.9800 -109.6500       5.5        21       103        60
OIR    2025250     91400   20.9800 -109.6600       5.5        21       103        60
OIR    2025250     91400   20.9800 -109.6700       5.5        21       103        60
OIR    2025250     91400   20.9800 -109.6800       5.5        21       103        60
OIR    2025250     91400   20.9800 -109.6900       5.5        21       104        60
OIR    2025250     91400   20.9800 -109.7000       5.5        21       104        60
OIR    2025250     91400   20.9800 -109.7100       5.4        22       104        60
OIR    2025250     91400   20.9800 -109.7200       5.3        21       105        60
OIR    2025250     91400   20.9800 -109.7300       5.2        21       104        60
OIR    2025250     91400   20.9800 -109.7400       4.9        19       104        60
OIR    2025250     91400   20.9800 -109.7500       4.6        18       104        60
OIR    2025250     91400   20.9800 -109.7600       4.5        17       104        60
OIR    2025250     91400   20.9800 -109.7700       4.4        16       105        60
OIR    2025250     91400   20.9800 -109.7800       4.2        15       104        60
OIR    2025250     91400   20.9800 -109.7900       4.2        15       104        60
OIR    2025250     91400   20.9800 -109.8000       4.1        14       103        60
OIR    2025250     91400   20.9800 -109.8100       4.0        14       103        60
OIR    2025250     91400   20.9700 -108.9700      10.8        63       139        60
OIR    2025250     91400   20.9700 -108.9800      10.1        63       133        60
OIR    2025250     91400   20.9700 -108.9900       9.8        61       128        60
OIR    2025250     91400   20.9700 -109.0000       9.5        59       122        60
OIR    2025250     91400   20.9700 -109.0100       9.4        56       120        60
OIR    2025250     91400   20.9700 -109.0200       9.3        45       117        60
OIR    2025250     91400   20.9700 -109.0300       9.3        41       116        60
OIR    2025250     91400   20.9700 -109.0400       9.3        41       114        60
OIR    2025250     91400   20.9700 -109.0500       9.3        41       111        60
OIR    2025250     91400   20.9700 -109.0600       9.3        41       110        60
OIR    2025250     91400   20.9700 -109.0700       9.3        41       109        60
OIR    2025250     91400   20.9700 -109.0800       9.3        40       108        60
OIR    2025250     91400   20.9700 -109.0900       9.3        40       108        60
OIR    2025250     91400   20.9700 -109.1000       9.2        39       107        60
OIR    2025250     91400   20.9700 -109.1100       9.2        39       108        60
OIR    2025250     91400   20.9700 -109.1200       9.2        39       109        60
OIR    2025250     91400   20.9700 -109.1300       9.1        38       110        60
OIR    2025250     91400   20.9700 -109.1400       9.1        38       109        60
OIR    2025250     91400   20.9700 -109.1500       9.1        38       108        60
OIR    2025250     91400   20.9700 -109.1600       9.1        38       107        60
OIR    2025250     91400   20.9700 -109.1700       9.0        37       105        60
OIR    2025250     91400   20.9700 -109.1800       9.0        37       105        60
OIR    2025250     91400   20.9700 -109.1900       9.0        37       107        60
OIR    2025250     91400   20.9700 -109.2000       9.0        37       109        60
OIR    2025250     91400   20.9700 -109.2100       8.9        36       109        60
OIR    2025250     91400   20.9700 -109.2200       8.9        36       109        60
OIR    2025250     91400   20.9700 -109.2300       8.9        36       110        60
OIR    2025250     91400   20.9700 -109.2400       8.9        36       110        60
OIR    2025250     91400   20.9700 -109.2500       8.9        36       110        60
OIR    2025250     91400   20.9700 -109.2600       8.8        36       110        60
OIR    2025250     91400   20.9700 -109.2700       8.8        36       109        60
OIR    2025250     91400   20.9700 -109.2800       8.8        36       109        60
OIR    2025250     91400   20.9700 -109.2900       8.8        36       108        60
OIR    2025250     91400   20.9700 -109.3000       8.8        35       108        60
OIR    2025250     91400   20.9700 -109.3100       8.8        35       108        60
OIR    2025250     91400   20.9700 -109.3200       8.8        35       109        60
OIR    2025250     91400   20.9700 -109.3300       8.7        35       110        60
OIR    2025250     91400   20.9700 -109.3400       8.7        35       110        60
OIR    2025250     91400   20.9700 -109.3500       8.7        35       110        60
OIR    2025250     91400   20.9700 -109.3600       8.6        35       110        60
OIR    2025250     91400   20.9700 -109.3700       8.6        35       109        60
OIR    2025250     91400   20.9700 -109.3800       8.5        34       109        60
OIR    2025250     91400   20.9700 -109.3900       8.4        34       110        60
OIR    2025250     91400   20.9700 -109.4000       8.3        34       110        60
OIR    2025250     91400   20.9700 -109.4100       8.1        34       109        60
OIR    2025250     91400   20.9700 -109.4200       8.0        33       108        60
OIR    2025250     91400   20.9700 -109.4300       7.9        33       105        60
OIR    2025250     91400   20.9700 -109.4400       7.9        33       104        60
OIR    2025250     91400   20.9700 -109.4500       7.8        33       104        60
OIR    2025250     91400   20.9700 -109.4600       7.6        33       104        60
OIR    2025250     91400   20.9700 -109.4700       7.5        33       105        60
OIR    2025250     91400   20.9700 -109.4800       7.3        33       105        60
OIR    2025250     91400   20.9700 -109.4900       7.2        33       104        60
OIR    2025250     91400   20.9700 -109.5000       7.1        33       104        60
OIR    2025250     91400   20.9700 -109.5100       7.0        33       104        60
OIR    2025250     91400   20.9700 -109.5200       7.1        34       103        60
OIR    2025250     91400   20.9700 -109.5300       7.1        34       103        60
OIR    2025250     91400   20.9700 -109.5400       7.1        34       104        60
OIR    2025250     91400   20.9700 -109.5500       7.2        34       104        60
OIR    2025250     91400   20.9700 -109.5600       7.2        35       105        60
OIR    2025250     91400   20.9700 -109.5700       7.2        34       108        60
OIR    2025250     91400   20.9700 -109.5800       7.1        34       109        60
OIR    2025250     91400   20.9700 -109.5900       6.7        32       111        60
OIR    2025250     91400   20.9700 -109.6000       5.8        22       113        60
OIR    2025250     91400   20.9700 -109.6100       5.7        21       111        60
OIR    2025250     91400   20.9700 -109.6200       5.7        21       109        60
OIR    2025250     91400   20.9700 -109.6300       5.7        21       107        60
OIR    2025250     91400   20.9700 -109.6400       5.7        21       104        60
OIR    2025250     91400   20.9700 -109.6500       5.6        21       103        60
OIR    2025250     91400   20.9700 -109.6600       5.6        21       103        60
OIR    2025250     91400   20.9700 -109.6700       5.6        21       103        60
OIR    2025250     91400   20.9700 -109.6800       5.6        21       103        60
OIR    2025250     91400   20.9700 -109.6900       5.6        22       103        60
OIR    2025250     91400   20.9700 -109.7000       5.6        22       103        60
OIR    2025250     91400   20.9700 -109.7100       5.6        22       104        60
OIR    2025250     91400   20.9700 -109.7200       5.5        22       104        60
OIR    2025250     91400   20.9700 -109.7300       5.4        22       104        60
OIR    2025250     91400   20.9700 -109.7400       5.2        21       104        60
OIR    2025250     91400   20.9700 -109.7500       4.9        20       104        60
OIR    2025250     91400   20.9700 -109.7600       4.7        19       104        60
OIR    2025250     91400   20.9700 -109.7700       4.5        17       104        60
OIR    2025250     91400   20.9700 -109.7800       4.4        16       104        60
OIR    2025250     91400   20.9700 -109.7900       4.2        15       104        60
OIR    2025250     91400   20.9700 -109.8000       4.2        15       103        60
OIR    2025250     91400   20.9700 -109.8100       4.1        15       103        60
OIR    2025250     91400   20.9700 -109.8200       4.0        14       103        60
OIR    2025250     91400   20.9600 -108.9700      10.2        63       137        60
OIR    2025250     91400   20.9600 -108.9800       9.2        63       130        60
OIR    2025250     91400   20.9600 -108.9900       9.2        61       126        60
OIR    2025250     91400   20.9600 -109.0000       9.2        59       122        60
OIR    2025250     91400   20.9600 -109.0100       9.2        57       119        60
OIR    2025250     91400   20.9600 -109.0200       9.1        44       117        60
OIR    2025250     91400   20.9600 -109.0300       9.2        41       116        60
OIR    2025250     91400   20.9600 -109.0400       9.3        41       115        60
OIR    2025250     91400   20.9600 -109.0500       9.3        41       112        60
OIR    2025250     91400   20.9600 -109.0600       9.3        41       111        60
OIR    2025250     91400   20.9600 -109.0700       9.3        40       110        60
OIR    2025250     91400   20.9600 -109.0800       9.3        40       109        60
OIR    2025250     91400   20.9600 -109.0900       9.2        39       108        60
OIR    2025250     91400   20.9600 -109.1000       9.2        39       108        60
OIR    2025250     91400   20.9600 -109.1100       9.2        39       107        60
OIR    2025250     91400   20.9600 -109.1200       9.2        38       107        60
OIR    2025250     91400   20.9600 -109.1300       9.1        38       108        60
OIR    2025250     91400   20.9600 -109.1400       9.1        38       108        60
OIR    2025250     91400   20.9600 -109.1500       9.1        38       108        60
OIR    2025250     91400   20.9600 -109.1600       9.0        37       108        60
OIR    2025250     91400   20.9600 -109.1700       9.0        37       107        60
OIR    2025250     91400   20.9600 -109.1800       9.0        37       107        60
OIR    2025250     91400   20.9600 -109.1900       9.0        37       108        60
OIR    2025250     91400   20.9600 -109.2000       9.0        37       108        60
OIR    2025250     91400   20.9600 -109.2100       8.9        36       109        60
OIR    2025250     91400   20.9600 -109.2200       8.9        36       110        60
OIR    2025250     91400   20.9600 -109.2300       8.9        36       110        60
OIR    2025250     91400   20.9600 -109.2400       8.9        36       110        60
OIR    2025250     91400   20.9600 -109.2500       8.9        36       110        60
OIR    2025250     91400   20.9600 -109.2600       8.8        36       110        60
OIR    2025250     91400   20.9600 -109.2700       8.8        36       110        60
OIR    2025250     91400   20.9600 -109.2800       8.8        36       109        60
OIR    2025250     91400   20.9600 -109.2900       8.8        36       108        60
OIR    2025250     91400   20.9600 -109.3000       8.8        35       107        60
OIR    2025250     91400   20.9600 -109.3100       8.8        35       107        60
OIR    2025250     91400   20.9600 -109.3200       8.8        35       108        60
OIR    2025250     91400   20.9600 -109.3300       8.8        35       109        60
OIR    2025250     91400   20.9600 -109.3400       8.7        35       110        60
OIR    2025250     91400   20.9600 -109.3500       8.7        35       110        60
OIR    2025250     91400   20.9600 -109.3600       8.7        35       110        60
OIR    2025250     91400   20.9600 -109.3700       8.6        35       109        60
OIR    2025250     91400   20.9600 -109.3800       8.5        34       108        60
OIR    2025250     91400   20.9600 -109.3900       8.5        34       109        60
OIR    2025250     91400   20.9600 -109.4000       8.3        34       109        60
OIR    2025250     91400   20.9600 -109.4100       8.2        34       109        60
OIR    2025250     91400   20.9600 -109.4200       8.1        34       107        60
OIR    2025250     91400   20.9600 -109.4300       8.0        34       105        60
OIR    2025250     91400   20.9600 -109.4400       7.9        34       104        60
OIR    2025250     91400   20.9600 -109.4500       7.9        34       104        60
OIR    2025250     91400   20.9600 -109.4600       7.7        34       105        60
OIR    2025250     91400   20.9600 -109.4700       7.6        34       107        60
OIR    2025250     91400   20.9600 -109.4800       7.5        33       107        60
OIR    2025250     91400   20.9600 -109.4900       7.4        33       105        60
OIR    2025250     91400   20.9600 -109.5000       7.3        34       104        60
OIR    2025250     91400   20.9600 -109.5100       7.3        34       104        60
OIR    2025250     91400   20.9600 -109.5200       7.2        34       103        60
OIR    2025250     91400   20.9600 -109.5300       7.3        34       103        60
OIR    2025250     91400   20.9600 -109.5400       7.3        34       104        60
OIR    2025250     91400   20.9600 -109.5500       7.3        35       104        60
OIR    2025250     91400   20.9600 -109.5600       7.3        35       105        60
OIR    2025250     91400   20.9600 -109.5700       7.3        35       107        60
OIR    2025250     91400   20.9600 -109.5800       7.3        34       109        60
OIR    2025250     91400   20.9600 -109.5900       7.1        33       111        60
OIR    2025250     91400   20.9600 -109.6000       6.0        23       114        60
OIR    2025250     91400   20.9600 -109.6100       5.8        22       113        60
OIR    2025250     91400   20.9600 -109.6200       5.7        21       110        60
OIR    2025250     91400   20.9600 -109.6300       5.7        21       108        60
OIR    2025250     91400   20.9600 -109.6400       5.7        21       105        60
OIR    2025250     91400   20.9600 -109.6500       5.7        21       103        60
OIR    2025250     91400   20.9600 -109.6600       5.7        21       103        60
OIR    2025250     91400   20.9600 -109.6700       5.7        21       103        60
OIR    2025250     91400   20.9600 -109.6800       5.7        22       103        60
OIR    2025250     91400   20.9600 -109.6900       5.7        22       103        60
OIR    2025250     91400   20.9600 -109.7000       5.7        22       103        60
OIR    2025250     91400   20.9600 -109.7100       5.7        22       103        60
OIR    2025250     91400   20.9600 -109.7200       5.6        23       104        60
OIR    2025250     91400   20.9600 -109.7300       5.5        23       104        60
OIR    2025250     91400   20.9600 -109.7400       5.4        22       104        60
OIR    2025250     91400   20.9600 -109.7500       5.1        21       104        60
OIR    2025250     91400   20.9600 -109.7600       4.9        20       104        60
OIR    2025250     91400   20.9600 -109.7700       4.7        19       105        60
OIR    2025250     91400   20.9600 -109.7800       4.5        18       104        60
OIR    2025250     91400   20.9600 -109.7900       4.4        17       104        60
OIR    2025250     91400   20.9600 -109.8000       4.2        16       103        60
OIR    2025250     91400   20.9600 -109.8100       4.2        15       103        60
OIR    2025250     91400   20.9600 -109.8200       4.1        15       103        60
OIR    2025250     91400   20.9600 -109.8300       4.0        15       103        60
OIR    2025250     91400   20.9500 -108.9700       9.2        63       139        60
OIR    2025250     91400   20.9500 -108.9800       8.8        62       132        60
OIR    2025250     91400   20.9500 -108.9900       8.6        61       126        60
OIR    2025250     91400   20.9500 -109.0000       8.6        59       123        60
OIR    2025250     91400   20.9500 -109.0100       8.8        55       120        60
OIR    2025250     91400   20.9500 -109.0200       9.1        42       119        60
OIR    2025250     91400   20.9500 -109.0300       9.2        41       117        60
OIR    2025250     91400   20.9500 -109.0400       9.2        41       116        60
OIR    2025250     91400   20.9500 -109.0500       9.2        41       114        60
OIR    2025250     91400   20.9500 -109.0600       9.3        41       112        60
OIR    2025250     91400   20.9500 -109.0700       9.3        40       111        60
OIR    2025250     91400   20.9500 -109.0800       9.2        40       110        60
OIR    2025250     91400   20.9500 -109.0900       9.2        39       109        60
OIR    2025250     91400   20.9500 -109.1000       9.2        39       108        60
OIR    2025250     91400   20.9500 -109.1100       9.2        39       107        60
OIR    2025250     91400   20.9500 -109.1200       9.1        38       107        60
OIR    2025250     91400   20.9500 -109.1300       9.1        38       107        60
OIR    2025250     91400   20.9500 -109.1400       9.1        38       107        60
OIR    2025250     91400   20.9500 -109.1500       9.1        38       108        60
OIR    2025250     91400   20.9500 -109.1600       9.0        37       108        60
OIR    2025250     91400   20.9500 -109.1700       9.0        37       108        60
OIR    2025250     91400   20.9500 -109.1800       9.0        37       108        60
OIR    2025250     91400   20.9500 -109.1900       9.0        37       108        60
OIR    2025250     91400   20.9500 -109.2000       8.9        36       108        60
OIR    2025250     91400   20.9500 -109.2100       8.9        36       108        60
OIR    2025250     91400   20.9500 -109.2200       8.9        36       109        60
OIR    2025250     91400   20.9500 -109.2300       8.9        36       109        60
OIR    2025250     91400   20.9500 -109.2400       8.9        36       110        60
OIR    2025250     91400   20.9500 -109.2500       8.9        36       110        60
OIR    2025250     91400   20.9500 -109.2600       8.9        36       110        60
OIR    2025250     91400   20.9500 -109.2700       8.8        36       110        60
OIR    2025250     91400   20.9500 -109.2800       8.8        36       109        60
OIR    2025250     91400   20.9500 -109.2900       8.8        35       108        60
OIR    2025250     91400   20.9500 -109.3000       8.8        35       107        60
OIR    2025250     91400   20.9500 -109.3100       8.8        35       107        60
OIR    2025250     91400   20.9500 -109.3200       8.8        35       108        60
OIR    2025250     91400   20.9500 -109.3300       8.8        35       109        60
OIR    2025250     91400   20.9500 -109.3400       8.7        35       109        60
OIR    2025250     91400   20.9500 -109.3500       8.7        35       109        60
OIR    2025250     91400   20.9500 -109.3600       8.7        35       109        60
OIR    2025250     91400   20.9500 -109.3700       8.6        35       108        60
OIR    2025250     91400   20.9500 -109.3800       8.6        34       107        60
OIR    2025250     91400   20.9500 -109.3900       8.5        34       107        60
OIR    2025250     91400   20.9500 -109.4000       8.4        34       108        60
OIR    2025250     91400   20.9500 -109.4100       8.3        34       108        60
OIR    2025250     91400   20.9500 -109.4200       8.2        34       107        60
OIR    2025250     91400   20.9500 -109.4300       8.1        34       107        60
OIR    2025250     91400   20.9500 -109.4400       8.0        34       105        60
OIR    2025250     91400   20.9500 -109.4500       7.9        34       104        60
OIR    2025250     91400   20.9500 -109.4600       7.8        34       104        60
OIR    2025250     91400   20.9500 -109.4700       7.7        34       107        60
OIR    2025250     91400   20.9500 -109.4800       7.6        34       108        60
OIR    2025250     91400   20.9500 -109.4900       7.5        34       107        60
OIR    2025250     91400   20.9500 -109.5000       7.4        34       104        60
OIR    2025250     91400   20.9500 -109.5100       7.4        34       104        60
OIR    2025250     91400   20.9500 -109.5200       7.3        34       104        60
OIR    2025250     91400   20.9500 -109.5300       7.3        34       103        60
OIR    2025250     91400   20.9500 -109.5400       7.4        34       103        60
OIR    2025250     91400   20.9500 -109.5500       7.4        35       104        60
OIR    2025250     91400   20.9500 -109.5600       7.4        35       104        60
OIR    2025250     91400   20.9500 -109.5700       7.4        35       107        60
OIR    2025250     91400   20.9500 -109.5800       7.4        35       109        60
OIR    2025250     91400   20.9500 -109.5900       7.3        34       111        60
OIR    2025250     91400   20.9500 -109.6000       6.3        25       113        60
OIR    2025250     91400   20.9500 -109.6100       6.0        23       114        60
OIR    2025250     91400   20.9500 -109.6200       5.8        22       112        60
OIR    2025250     91400   20.9500 -109.6300       5.8        21       109        60
OIR    2025250     91400   20.9500 -109.6400       5.8        21       107        60
OIR    2025250     91400   20.9500 -109.6500       5.8        21       104        60
OIR    2025250     91400   20.9500 -109.6600       5.8        21       103        60
OIR    2025250     91400   20.9500 -109.6700       5.8        22       103        60
OIR    2025250     91400   20.9500 -109.6800       5.8        22       103        60
OIR    2025250     91400   20.9500 -109.6900       5.8        22       103        60
OIR    2025250     91400   20.9500 -109.7000       5.8        23       103        60
OIR    2025250     91400   20.9500 -109.7100       5.7        23       103        60
OIR    2025250     91400   20.9500 -109.7200       5.7        23       103        60
OIR    2025250     91400   20.9500 -109.7300       5.6        23       103        60
OIR    2025250     91400   20.9500 -109.7400       5.5        23       104        60
OIR    2025250     91400   20.9500 -109.7500       5.3        22       104        60
OIR    2025250     91400   20.9500 -109.7600       5.1        21       104        60
OIR    2025250     91400   20.9500 -109.7700       4.9        20       105        60
OIR    2025250     91400   20.9500 -109.7800       4.7        19       105        60
OIR    2025250     91400   20.9500 -109.7900       4.5        18       104        60
OIR    2025250     91400   20.9500 -109.8000       4.4        17       104        60
OIR    2025250     91400   20.9500 -109.8100       4.2        16       103        60
OIR    2025250     91400   20.9500 -109.8200       4.1        16       103        60
OIR    2025250     91400   20.9500 -109.8300       4.1        15       103        60
OIR    2025250     91400   20.9500 -109.8400       4.0        15       103        60
OIR    2025250     91400   20.9400 -108.9800       8.6        61       134        60
OIR    2025250     91400   20.9400 -108.9900       8.5        60       127        60
OIR    2025250     91400   20.9400 -109.0000       8.4        59       124        60
OIR    2025250     91400   20.9400 -109.0100       8.5        53       121        60
OIR    2025250     91400   20.9400 -109.0200       9.2        41       120        60
OIR    2025250     91400   20.9400 -109.0300       9.2        41       117        60
OIR    2025250     91400   20.9400 -109.0400       9.2        41       116        60
OIR    2025250     91400   20.9400 -109.0500       9.2        41       115        60
OIR    2025250     91400   20.9400 -109.0600       9.2        40       113        60
OIR    2025250     91400   20.9400 -109.0700       9.2        40       112        60
OIR    2025250     91400   20.9400 -109.0800       9.2        40       112        60
OIR    2025250     91400   20.9400 -109.0900       9.2        39       111        60
OIR    2025250     91400   20.9400 -109.1000       9.2        39       109        60
OIR    2025250     91400   20.9400 -109.1100       9.1        38       107        60
OIR    2025250     91400   20.9400 -109.1200       9.1        38       107        60
OIR    2025250     91400   20.9400 -109.1300       9.1        38       107        60
OIR    2025250     91400   20.9400 -109.1400       9.1        38       107        60
OIR    2025250     91400   20.9400 -109.1500       9.1        37       108        60
OIR    2025250     91400   20.9400 -109.1600       9.0        37       108        60
OIR    2025250     91400   20.9400 -109.1700       9.0        37       109        60
OIR    2025250     91400   20.9400 -109.1800       9.0        37       109        60
OIR    2025250     91400   20.9400 -109.1900       9.0        36       109        60
OIR    2025250     91400   20.9400 -109.2000       8.9        36       108        60
OIR    2025250     91400   20.9400 -109.2100       8.9        36       107        60
OIR    2025250     91400   20.9400 -109.2200       8.9        36       107        60
OIR    2025250     91400   20.9400 -109.2300       8.9        36       107        60
OIR    2025250     91400   20.9400 -109.2400       8.9        36       107        60
OIR    2025250     91400   20.9400 -109.2500       8.9        36       109        60
OIR    2025250     91400   20.9400 -109.2600       8.9        36       110        60
OIR    2025250     91400   20.9400 -109.2700       8.8        36       109        60
OIR    2025250     91400   20.9400 -109.2800       8.8        36       109        60
OIR    2025250     91400   20.9400 -109.2900       8.8        35       108        60
OIR    2025250     91400   20.9400 -109.3000       8.8        35       108        60
OIR    2025250     91400   20.9400 -109.3100       8.8        35       108        60
OIR    2025250     91400   20.9400 -109.3200       8.8        35       109        60
OIR    2025250     91400   20.9400 -109.3300       8.8        35       109        60
OIR    2025250     91400   20.9400 -109.3400       8.8        35       110        60
OIR    2025250     91400   20.9400 -109.3500       8.7        35       109        60
OIR    2025250     91400   20.9400 -109.3600       8.7        35       108        60
OIR    2025250     91400   20.9400 -109.3700       8.7        35       107        60
OIR    2025250     91400   20.9400 -109.3800       8.6        35       105        60
OIR    2025250     91400   20.9400 -109.3900       8.6        34       105        60
OIR    2025250     91400   20.9400 -109.4000       8.5        34       107        60
OIR    2025250     91400   20.9400 -109.4100       8.4        34       108        60
OIR    2025250     91400   20.9400 -109.4200       8.3        34       107        60
OIR    2025250     91400   20.9400 -109.4300       8.2        34       107        60
OIR    2025250     91400   20.9400 -109.4400       8.1        34       107        60
OIR    2025250     91400   20.9400 -109.4500       8.0        34       105        60
OIR    2025250     91400   20.9400 -109.4600       7.9        34       105        60
OIR    2025250     91400   20.9400 -109.4700       7.8        34       105        60
OIR    2025250     91400   20.9400 -109.4800       7.6        34       107        60
OIR    2025250     91400   20.9400 -109.4900       7.5        34       107        60
OIR    2025250     91400   20.9400 -109.5000       7.5        34       105        60
OIR    2025250     91400   20.9400 -109.5100       7.4        34       104        60
OIR    2025250     91400   20.9400 -109.5200       7.4        34       104        60
OIR    2025250     91400   20.9400 -109.5300       7.4        34       103        60
OIR    2025250     91400   20.9400 -109.5400       7.4        35       103        60
OIR    2025250     91400   20.9400 -109.5500       7.4        35       103        60
OIR    2025250     91400   20.9400 -109.5600       7.4        35       103        60
OIR    2025250     91400   20.9400 -109.5700       7.4        35       107        60
OIR    2025250     91400   20.9400 -109.5800       7.4        35       110        60
OIR    2025250     91400   20.9400 -109.5900       7.4        35       112        60
OIR    2025250     91400   20.9400 -109.6000       6.6        28       113        60
OIR    2025250     91400   20.9400 -109.6100       6.3        25       115        60
OIR    2025250     91400   20.9400 -109.6200       6.1        23       113        60
OIR    2025250     91400   20.9400 -109.6300       5.9        22       111        60
OIR    2025250     91400   20.9400 -109.6400       5.8        21       108        60
OIR    2025250     91400   20.9400 -109.6500       5.8        21       104        60
OIR    2025250     91400   20.9400 -109.6600       5.8        21       103        60
OIR    2025250     91400   20.9400 -109.6700       5.8        22       103        60
OIR    2025250     91400   20.9400 -109.6800       5.8        22       103        60
OIR    2025250     91400   20.9400 -109.6900       5.8        23       103        60
OIR    2025250     91400   20.9400 -109.7000       5.8        23       104        60
OIR    2025250     91400   20.9400 -109.7100       5.8        23       104        60
OIR    2025250     91400   20.9400 -109.7200       5.8        24       103        60
OIR    2025250     91400   20.9400 -109.7300       5.7        24       103        60
OIR    2025250     91400   20.9400 -109.7400       5.6        24       104        60
OIR    2025250     91400   20.9400 -109.7500       5.5        23       104        60
OIR    2025250     91400   20.9400 -109.7600       5.3        22       104        60
OIR    2025250     91400   20.9400 -109.7700       5.0        21       104        60
OIR    2025250     91400   20.9400 -109.7800       4.8        20       104        60
OIR    2025250     91400   20.9400 -109.7900       4.7        19       104        60
OIR    2025250     91400   20.9400 -109.8000       4.5        18       104        60
OIR    2025250     91400   20.9400 -109.8100       4.3        17       103        60
OIR    2025250     91400   20.9400 -109.8200       4.2        17       103        60
OIR    2025250     91400   20.9400 -109.8300       4.1        16       103        60
OIR    2025250     91400   20.9400 -109.8400       4.1        16       104        60
OIR    2025250     91400   20.9400 -109.8500       4.0        15       104        60
OIR    2025250     91400   20.9300 -108.9800       8.5        60       140        60
OIR    2025250     91400   20.9300 -108.9900       8.5        60       134        60
OIR    2025250     91400   20.9300 -109.0000       8.4        59       129        60
OIR    2025250     91400   20.9300 -109.0100       8.3        51       124        60
OIR    2025250     91400   20.9300 -109.0200       9.1        41       121        60
OIR    2025250     91400   20.9300 -109.0300       9.2        41       120        60
OIR    2025250     91400   20.9300 -109.0400       9.2        41       117        60
OIR    2025250     91400   20.9300 -109.0500       9.2        40       116        60
OIR    2025250     91400   20.9300 -109.0600       9.2        40       115        60
OIR    2025250     91400   20.9300 -109.0700       9.2        40       113        60
OIR    2025250     91400   20.9300 -109.0800       9.2        39       111        60
OIR    2025250     91400   20.9300 -109.0900       9.2        39       110        60
OIR    2025250     91400   20.9300 -109.1000       9.1        38       109        60
OIR    2025250     91400   20.9300 -109.1100       9.1        38       108        60
OIR    2025250     91400   20.9300 -109.1200       9.1        38       107        60
OIR    2025250     91400   20.9300 -109.1300       9.1        38       108        60
OIR    2025250     91400   20.9300 -109.1400       9.1        38       108        60
OIR    2025250     91400   20.9300 -109.1500       9.1        37       108        60
OIR    2025250     91400   20.9300 -109.1600       9.0        37       108        60
OIR    2025250     91400   20.9300 -109.1700       9.0        37       109        60
OIR    2025250     91400   20.9300 -109.1800       9.0        37       109        60
OIR    2025250     91400   20.9300 -109.1900       9.0        36       109        60
OIR    2025250     91400   20.9300 -109.2000       8.9        36       108        60
OIR    2025250     91400   20.9300 -109.2100       8.9        36       107        60
OIR    2025250     91400   20.9300 -109.2200       8.9        36       105        60
OIR    2025250     91400   20.9300 -109.2300       8.9        36       105        60
OIR    2025250     91400   20.9300 -109.2400       8.9        36       104        60
OIR    2025250     91400   20.9300 -109.2500       8.9        36       107        60
OIR    2025250     91400   20.9300 -109.2600       8.9        36       109        60
OIR    2025250     91400   20.9300 -109.2700       8.8        36       109        60
OIR    2025250     91400   20.9300 -109.2800       8.8        35       108        60
OIR    2025250     91400   20.9300 -109.2900       8.8        35       108        60
OIR    2025250     91400   20.9300 -109.3000       8.8        35       108        60
OIR    2025250     91400   20.9300 -109.3100       8.8        35       109        60
OIR    2025250     91400   20.9300 -109.3200       8.8        35       110        60
OIR    2025250     91400   20.9300 -109.3300       8.8        35       110        60
OIR    2025250     91400   20.9300 -109.3400       8.8        35       110        60
OIR    2025250     91400   20.9300 -109.3500       8.8        35       109        60
OIR    2025250     91400   20.9300 -109.3600       8.7        35       108        60
OIR    2025250     91400   20.9300 -109.3700       8.7        35       107        60
OIR    2025250     91400   20.9300 -109.3800       8.7        35       105        60
OIR    2025250     91400   20.9300 -109.3900       8.6        35       104        60
OIR    2025250     91400   20.9300 -109.4000       8.5        34       107        60
OIR    2025250     91400   20.9300 -109.4100       8.4        34       109        60
OIR    2025250     91400   20.9300 -109.4200       8.3        34       108        60
OIR    2025250     91400   20.9300 -109.4300       8.3        34       108        60
OIR    2025250     91400   20.9300 -109.4400       8.2        34       108        60
OIR    2025250     91400   20.9300 -109.4500       8.1        34       107        60
OIR    2025250     91400   20.9300 -109.4600       8.0        34       107        60
OIR    2025250     91400   20.9300 -109.4700       7.9        34       105        60
OIR    2025250     91400   20.9300 -109.4800       7.8        34       104        60
OIR    2025250     91400   20.9300 -109.4900       7.6        34       104        60
OIR    2025250     91400   20.9300 -109.5000       7.5        34       104        60
OIR    2025250     91400   20.9300 -109.5100       7.5        34       105        60
OIR    2025250     91400   20.9300 -109.5200       7.5        34       104        60
OIR    2025250     91400   20.9300 -109.5300       7.5        34       104        60
OIR    2025250     91400   20.9300 -109.5400       7.5        35       103        60
OIR    2025250     91400   20.9300 -109.5500       7.4        35       103        60
OIR    2025250     91400   20.9300 -109.5600       7.4        35       103        60
OIR    2025250     91400   20.9300 -109.5700       7.4        35       105        60
OIR    2025250     91400   20.9300 -109.5800       7.4        35       109        60
OIR    2025250     91400   20.9300 -109.5900       7.4        34       111        60
OIR    2025250     91400   20.9300 -109.6000       7.1        31       113        60
OIR    2025250     91400   20.9300 -109.6100       6.6        26       115        60
OIR    2025250     91400   20.9300 -109.6200       6.5        23       113        60
OIR    2025250     91400   20.9300 -109.6300       6.2        22       111        60
OIR    2025250     91400   20.9300 -109.6400       6.0        22       108        60
OIR    2025250     91400   20.9300 -109.6500       5.9        22       105        60
OIR    2025250     91400   20.9300 -109.6600       5.9        22       103        60
OIR    2025250     91400   20.9300 -109.6700       5.9        22       103        60
OIR    2025250     91400   20.9300 -109.6800       5.9        23       104        60
OIR    2025250     91400   20.9300 -109.6900       5.9        23       104        60
OIR    2025250     91400   20.9300 -109.7000       5.9        24       104        60
OIR    2025250     91400   20.9300 -109.7100       5.8        24       104        60
OIR    2025250     91400   20.9300 -109.7200       5.8        24       103        60
OIR    2025250     91400   20.9300 -109.7300       5.7        24       103        60
OIR    2025250     91400   20.9300 -109.7400       5.7        24       103        60
OIR    2025250     91400   20.9300 -109.7500       5.6        24       104        60
OIR    2025250     91400   20.9300 -109.7600       5.4        23       104        60
OIR    2025250     91400   20.9300 -109.7700       5.2        22       104        60
OIR    2025250     91400   20.9300 -109.7800       5.0        21       104        60
OIR    2025250     91400   20.9300 -109.7900       4.8        20       104        60
OIR    2025250     91400   20.9300 -109.8000       4.6        19       103        60
OIR    2025250     91400   20.9300 -109.8100       4.5        18       103        60
OIR    2025250     91400   20.9300 -109.8200       4.3        18       103        60
OIR    2025250     91400   20.9300 -109.8300       4.2        17       103        60
OIR    2025250     91400   20.9300 -109.8400       4.2        16       104        60
OIR    2025250     91400   20.9300 -109.8500       4.1        16       105        60
OIR    2025250     91400   20.9300 -109.8600       4.0        15       107        60
OIR    2025250     91400   20.9300 -115.1000      21.5       157       143        60
OIR    2025250     91400   20.9200 -108.9900       9.0        58       140        60
OIR    2025250     91400   20.9200 -109.0000       8.8        55       134        60
OIR    2025250     91400   20.9200 -109.0100       8.6        48       127        60
OIR    2025250     91400   20.9200 -109.0200       9.1        41       123        60
OIR    2025250     91400   20.9200 -109.0300       9.1        41       121        60
OIR    2025250     91400   20.9200 -109.0400       9.2        40       119        60
OIR    2025250     91400   20.9200 -109.0500       9.2        40       116        60
OIR    2025250     91400   20.9200 -109.0600       9.2        40       116        60
OIR    2025250     91400   20.9200 -109.0700       9.2        39       115        60
OIR    2025250     91400   20.9200 -109.0800       9.2        39       112        60
OIR    2025250     91400   20.9200 -109.0900       9.2        39       109        60
OIR    2025250     91400   20.9200 -109.1000       9.1        38       109        60
OIR    2025250     91400   20.9200 -109.1100       9.1        38       109        60
OIR    2025250     91400   20.9200 -109.1200       9.1        38       109        60
OIR    2025250     91400   20.9200 -109.1300       9.1        38       109        60
OIR    2025250     91400   20.9200 -109.1400       9.1        37       109        60
OIR    2025250     91400   20.9200 -109.1500       9.1        37       109        60
OIR    2025250     91400   20.9200 -109.1600       9.0        37       109        60
OIR    2025250     91400   20.9200 -109.1700       9.0        37       109        60
OIR    2025250     91400   20.9200 -109.1800       9.0        36       109        60
OIR    2025250     91400   20.9200 -109.1900       9.0        36       110        60
OIR    2025250     91400   20.9200 -109.2000       8.9        36       109        60
OIR    2025250     91400   20.9200 -109.2100       8.9        36       108        60
OIR    2025250     91400   20.9200 -109.2200       8.9        36       107        60
OIR    2025250     91400   20.9200 -109.2300       8.9        36       107        60
OIR    2025250     91400   20.9200 -109.2400       8.9        36       107        60
OIR    2025250     91400   20.9200 -109.2500       8.9        36       107        60
OIR    2025250     91400   20.9200 -109.2600       8.9        36       108        60
OIR    2025250     91400   20.9200 -109.2700       8.8        36       109        60
OIR    2025250     91400   20.9200 -109.2800       8.8        35       108        60
OIR    2025250     91400   20.9200 -109.2900       8.8        35       108        60
OIR    2025250     91400   20.9200 -109.3000       8.8        35       108        60
OIR    2025250     91400   20.9200 -109.3100       8.8        35       109        60
OIR    2025250     91400   20.9200 -109.3200       8.8        35       109        60
OIR    2025250     91400   20.9200 -109.3300       8.8        35       109        60
OIR    2025250     91400   20.9200 -109.3400       8.8        35       109        60
OIR    2025250     91400   20.9200 -109.3500       8.8        35       108        60
OIR    2025250     91400   20.9200 -109.3600       8.8        35       107        60
OIR    2025250     91400   20.9200 -109.3700       8.7        35       107        60
OIR    2025250     91400   20.9200 -109.3800       8.7        35       105        60
OIR    2025250     91400   20.9200 -109.3900       8.6        35       104        60
OIR    2025250     91400   20.9200 -109.4000       8.6        35       107        60
OIR    2025250     91400   20.9200 -109.4100       8.5        34       108        60
OIR    2025250     91400   20.9200 -109.4200       8.4        34       108        60
OIR    2025250     91400   20.9200 -109.4300       8.3        34       108        60
OIR    2025250     91400   20.9200 -109.4400       8.3        34       108        60
OIR    2025250     91400   20.9200 -109.4500       8.2        34       107        60
OIR    2025250     91400   20.9200 -109.4600       8.2        34       107        60
OIR    2025250     91400   20.9200 -109.4700       8.1        34       105        60
OIR    2025250     91400   20.9200 -109.4800       8.0        34       104        60
OIR    2025250     91400   20.9200 -109.4900       7.8        34       104        60
OIR    2025250     91400   20.9200 -109.5000       7.6        34       104        60
OIR    2025250     91400   20.9200 -109.5100       7.5        34       105        60
OIR    2025250     91400   20.9200 -109.5200       7.5        34       105        60
OIR    2025250     91400   20.9200 -109.5300       7.5        34       104        60
OIR    2025250     91400   20.9200 -109.5400       7.5        34       103        60
OIR    2025250     91400   20.9200 -109.5500       7.5        35       103        60
OIR    2025250     91400   20.9200 -109.5600       7.5        35       103        60
OIR    2025250     91400   20.9200 -109.5700       7.5        35       104        60
OIR    2025250     91400   20.9200 -109.5800       7.5        35       108        60
OIR    2025250     91400   20.9200 -109.5900       7.4        34       111        60
OIR    2025250     91400   20.9200 -109.6000       7.3        31       113        60
OIR    2025250     91400   20.9200 -109.6100       7.0        26       115        60
OIR    2025250     91400   20.9200 -109.6200       6.8        24       113        60
OIR    2025250     91400   20.9200 -109.6300       6.6        23       110        60
OIR    2025250     91400   20.9200 -109.6400       6.4        23       108        60
OIR    2025250     91400   20.9200 -109.6500       6.2        22       105        60
OIR    2025250     91400   20.9200 -109.6600       6.1        23       104        60
OIR    2025250     91400   20.9200 -109.6700       6.0        23       104        60
OIR    2025250     91400   20.9200 -109.6800       6.0        24       104        60
OIR    2025250     91400   20.9200 -109.6900       6.0        24       104        60
OIR    2025250     91400   20.9200 -109.7000       6.0        24       104        60
OIR    2025250     91400   20.9200 -109.7100       6.0        25       104        60
OIR    2025250     91400   20.9200 -109.7200       5.9        25       104        60
OIR    2025250     91400   20.9200 -109.7300       5.8        25       103        60
OIR    2025250     91400   20.9200 -109.7400       5.7        25       103        60
OIR    2025250     91400   20.9200 -109.7500       5.6        25       104        60
OIR    2025250     91400   20.9200 -109.7600       5.5        24       104        60
OIR    2025250     91400   20.9200 -109.7700       5.3        24       104        60
OIR    2025250     91400   20.9200 -109.7800       5.2        23       104        60
OIR    2025250     91400   20.9200 -109.7900       5.0        22       103        60
OIR    2025250     91400   20.9200 -109.8000       4.8        21       103        60
OIR    2025250     91400   20.9200 -109.8100       4.6        20       103        60
OIR    2025250     91400   20.9200 -109.8200       4.5        19       103        60
OIR    2025250     91400   20.9200 -109.8300       4.3        18       103        60
OIR    2025250     91400   20.9200 -109.8400       4.3        17       104        60
OIR    2025250     91400   20.9200 -109.8500       4.2        17       105        60
OIR    2025250     91400   20.9200 -109.8600       4.1        17       108        60
OIR    2025250     91400   20.9200 -115.1000      23.2       162       117        60
OIR    2025250     91400   20.9100 -108.9900      10.0        52       140        60
OIR    2025250     91400   20.9100 -109.0000       9.5        49       135        60
OIR    2025250     91400   20.9100 -109.0100       9.1        44       130        60
OIR    2025250     91400   20.9100 -109.0200       9.1        41       125        60
OIR    2025250     91400   20.9100 -109.0300       9.1        40       122        60
OIR    2025250     91400   20.9100 -109.0400       9.1        40       120        60
OIR    2025250     91400   20.9100 -109.0500       9.1        40       117        60
OIR    2025250     91400   20.9100 -109.0600       9.2        40       116        60
OIR    2025250     91400   20.9100 -109.0700       9.1        39       115        60
OIR    2025250     91400   20.9100 -109.0800       9.1        39       113        60
OIR    2025250     91400   20.9100 -109.0900       9.1        38       109        60
OIR    2025250     91400   20.9100 -109.1000       9.1        38       108        60
OIR    2025250     91400   20.9100 -109.1100       9.1        38       109        60
OIR    2025250     91400   20.9100 -109.1200       9.1        38       109        60
OIR    2025250     91400   20.9100 -109.1300       9.1        38       109        60
OIR    2025250     91400   20.9100 -109.1400       9.1        37       109        60
OIR    2025250     91400   20.9100 -109.1500       9.0        37       109        60
OIR    2025250     91400   20.9100 -109.1600       9.0        37       109        60
OIR    2025250     91400   20.9100 -109.1700       9.0        37       109        60
OIR    2025250     91400   20.9100 -109.1800       9.0        36       109        60
OIR    2025250     91400   20.9100 -109.1900       9.0        36       109        60
OIR    2025250     91400   20.9100 -109.2000       8.9        36       109        60
OIR    2025250     91400   20.9100 -109.2100       8.9        36       108        60
OIR    2025250     91400   20.9100 -109.2200       8.9        36       108        60
OIR    2025250     91400   20.9100 -109.2300       8.9        36       108        60
OIR    2025250     91400   20.9100 -109.2400       8.9        36       108        60
OIR    2025250     91400   20.9100 -109.2500       8.9        36       108        60
OIR    2025250     91400   20.9100 -109.2600       8.9        36       108        60
OIR    2025250     91400   20.9100 -109.2700       8.8        35       108        60
OIR    2025250     91400   20.9100 -109.2800       8.8        35       108        60
OIR    2025250     91400   20.9100 -109.2900       8.8        35       108        60
OIR    2025250     91400   20.9100 -109.3000       8.8        35       108        60
OIR    2025250     91400   20.9100 -109.3100       8.8        35       109        60
OIR    2025250     91400   20.9100 -109.3200       8.8        35       109        60
OIR    2025250     91400   20.9100 -109.3300       8.8        35       108        60
OIR    2025250     91400   20.9100 -109.3400       8.8        35       107        60
OIR    2025250     91400   20.9100 -109.3500       8.8        35       107        60
OIR    2025250     91400   20.9100 -109.3600       8.8        35       107        60
OIR    2025250     91400   20.9100 -109.3700       8.8        35       107        60
OIR    2025250     91400   20.9100 -109.3800       8.7        35       107        60
OIR    2025250     91400   20.9100 -109.3900       8.7        35       107        60
OIR    2025250     91400   20.9100 -109.4000       8.6        35       107        60
OIR    2025250     91400   20.9100 -109.4100       8.5        34       107        60
OIR    2025250     91400   20.9100 -109.4200       8.4        34       107        60
OIR    2025250     91400   20.9100 -109.4300       8.4        34       107        60
OIR    2025250     91400   20.9100 -109.4400       8.3        34       105        60
OIR    2025250     91400   20.9100 -109.4500       8.3        34       105        60
OIR    2025250     91400   20.9100 -109.4600       8.2        34       105        60
OIR    2025250     91400   20.9100 -109.4700       8.2        34       105        60
OIR    2025250     91400   20.9100 -109.4800       8.1        34       104        60
OIR    2025250     91400   20.9100 -109.4900       8.0        34       104        60
OIR    2025250     91400   20.9100 -109.5000       7.8        34       104        60
OIR    2025250     91400   20.9100 -109.5100       7.7        34       105        60
OIR    2025250     91400   20.9100 -109.5200       7.6        34       105        60
OIR    2025250     91400   20.9100 -109.5300       7.5        34       104        60
OIR    2025250     91400   20.9100 -109.5400       7.5        34       104        60
OIR    2025250     91400   20.9100 -109.5500       7.5        34       104        60
OIR    2025250     91400   20.9100 -109.5600       7.5        35       104        60
OIR    2025250     91400   20.9100 -109.5700       7.5        35       104        60
OIR    2025250     91400   20.9100 -109.5800       7.5        35       108        60
OIR    2025250     91400   20.9100 -109.5900       7.5        34       111        60
OIR    2025250     91400   20.9100 -109.6000       7.4        31       112        60
OIR    2025250     91400   20.9100 -109.6100       7.2        27       113        60
OIR    2025250     91400   20.9100 -109.6200       7.0        25       113        60
OIR    2025250     91400   20.9100 -109.6300       6.9        24       110        60
OIR    2025250     91400   20.9100 -109.6400       6.7        24       108        60
OIR    2025250     91400   20.9100 -109.6500       6.5        24       105        60
OIR    2025250     91400   20.9100 -109.6600       6.4        24       104        60
OIR    2025250     91400   20.9100 -109.6700       6.3        25       104        60
OIR    2025250     91400   20.9100 -109.6800       6.3        25       104        60
OIR    2025250     91400   20.9100 -109.6900       6.3        26       104        60
OIR    2025250     91400   20.9100 -109.7000       6.2        26       104        60
OIR    2025250     91400   20.9100 -109.7100       6.2        27       104        60
OIR    2025250     91400   20.9100 -109.7200       6.1        27       104        60
OIR    2025250     91400   20.9100 -109.7300       6.0        26       104        60
OIR    2025250     91400   20.9100 -109.7400       5.8        26       104        60
OIR    2025250     91400   20.9100 -109.7500       5.7        26       104        60
OIR    2025250     91400   20.9100 -109.7600       5.6        25       104        60
OIR    2025250     91400   20.9100 -109.7700       5.4        25       104        60
OIR    2025250     91400   20.9100 -109.7800       5.3        24       104        60
OIR    2025250     91400   20.9100 -109.7900       5.1        23       103        60
OIR    2025250     91400   20.9100 -109.8000       5.0        23       103        60
OIR    2025250     91400   20.9100 -109.8100       4.8        21       103        60
OIR    2025250     91400   20.9100 -109.8200       4.6        20       103        60
OIR    2025250     91400   20.9100 -109.8300       4.5        19       104        60
OIR    2025250     91400   20.9100 -109.8400       4.3        18       104        60
OIR    2025250     91400   20.9100 -109.8500       4.2        18       107        60
OIR    2025250     91400   20.9100 -109.8600       4.1        18       108        60
OIR    2025250     91400   20.9100 -109.8700       4.0        18       110        60
OIR    2025250     91400   20.9100 -115.1000      27.0       173       135        60
OIR    2025250     91400   20.9000 -109.0000       9.9        49       135        60
OIR    2025250     91400   20.9000 -109.0100       9.3        43       131        60
OIR    2025250     91400   20.9000 -109.0200       9.2        41       127        60
OIR    2025250     91400   20.9000 -109.0300       9.1        40       124        60
OIR    2025250     91400   20.9000 -109.0400       9.1        40       122        60
OIR    2025250     91400   20.9000 -109.0500       9.1        40       120        60
OIR    2025250     91400   20.9000 -109.0600       9.1        39       117        60
OIR    2025250     91400   20.9000 -109.0700       9.1        39       116        60
OIR    2025250     91400   20.9000 -109.0800       9.1        38       113        60
OIR    2025250     91400   20.9000 -109.0900       9.1        38       111        60
OIR    2025250     91400   20.9000 -109.1000       9.1        38       109        60
OIR    2025250     91400   20.9000 -109.1100       9.1        38       109        60
OIR    2025250     91400   20.9000 -109.1200       9.1        38       110        60
OIR    2025250     91400   20.9000 -109.1300       9.1        38       110        60
OIR    2025250     91400   20.9000 -109.1400       9.0        37       109        60
OIR    2025250     91400   20.9000 -109.1500       9.0        37       108        60
OIR    2025250     91400   20.9000 -109.1600       9.0        37       108        60
OIR    2025250     91400   20.9000 -109.1700       9.0        37       107        60
OIR    2025250     91400   20.9000 -109.1800       9.0        36       107        60
OIR    2025250     91400   20.9000 -109.1900       8.9        36       107        60
OIR    2025250     91400   20.9000 -109.2000       8.9        36       107        60
OIR    2025250     91400   20.9000 -109.2100       8.9        36       107        60
OIR    2025250     91400   20.9000 -109.2200       8.9        36       107        60
OIR    2025250     91400   20.9000 -109.2300       8.9        36       107        60
OIR    2025250     91400   20.9000 -109.2400       8.9        36       108        60
OIR    2025250     91400   20.9000 -109.2500       8.9        36       109        60
OIR    2025250     91400   20.9000 -109.2600       8.9        36       109        60
OIR    2025250     91400   20.9000 -109.2700       8.8        35       109        60
OIR    2025250     91400   20.9000 -109.2800       8.8        35       108        60
OIR    2025250     91400   20.9000 -109.2900       8.8        35       107        60
OIR    2025250     91400   20.9000 -109.3000       8.8        35       105        60
OIR    2025250     91400   20.9000 -109.3100       8.8        35       107        60
OIR    2025250     91400   20.9000 -109.3200       8.8        35       108        60
OIR    2025250     91400   20.9000 -109.3300       8.8        35       108        60
OIR    2025250     91400   20.9000 -109.3400       8.8        35       107        60
OIR    2025250     91400   20.9000 -109.3500       8.8        35       107        60
OIR    2025250     91400   20.9000 -109.3600       8.8        35       107        60
OIR    2025250     91400   20.9000 -109.3700       8.8        35       105        60
OIR    2025250     91400   20.9000 -109.3800       8.8        35       107        60
OIR    2025250     91400   20.9000 -109.3900       8.7        35       107        60
OIR    2025250     91400   20.9000 -109.4000       8.7        35       107        60
OIR    2025250     91400   20.9000 -109.4100       8.6        34       107        60
OIR    2025250     91400   20.9000 -109.4200       8.5        34       105        60
OIR    2025250     91400   20.9000 -109.4300       8.4        34       105        60
OIR    2025250     91400   20.9000 -109.4400       8.4        34       104        60
OIR    2025250     91400   20.9000 -109.4500       8.3        34       104        60
OIR    2025250     91400   20.9000 -109.4600       8.3        34       104        60
OIR    2025250     91400   20.9000 -109.4700       8.3        34       104        60
OIR    2025250     91400   20.9000 -109.4800       8.2        34       104        60
OIR    2025250     91400   20.9000 -109.4900       8.2        34       105        60
OIR    2025250     91400   20.9000 -109.5000       8.1        34       105        60
OIR    2025250     91400   20.9000 -109.5100       7.9        34       105        60
OIR    2025250     91400   20.9000 -109.5200       7.8        34       104        60
OIR    2025250     91400   20.9000 -109.5300       7.7        34       105        60
OIR    2025250     91400   20.9000 -109.5400       7.6        34       105        60
OIR    2025250     91400   20.9000 -109.5500       7.6        34       104        60
OIR    2025250     91400   20.9000 -109.5600       7.5        35       105        60
OIR    2025250     91400   20.9000 -109.5700       7.5        35       105        60
OIR    2025250     91400   20.9000 -109.5800       7.5        34       109        60
OIR    2025250     91400   20.9000 -109.5900       7.6        33       112        60
OIR    2025250     91400   20.9000 -109.6000       7.5        31       112        60
OIR    2025250     91400   20.9000 -109.6100       7.4        28       112        60
OIR    2025250     91400   20.9000 -109.6200       7.2        26       112        60
OIR    2025250     91400   20.9000 -109.6300       7.0        25       110        60
OIR    2025250     91400   20.9000 -109.6400       6.9        25       108        60
OIR    2025250     91400   20.9000 -109.6500       6.8        25       107        60
OIR    2025250     91400   20.9000 -109.6600       6.7        26       105        60
OIR    2025250     91400   20.9000 -109.6700       6.7        27       105        60
OIR    2025250     91400   20.9000 -109.6800       6.7        27       104        60
OIR    2025250     91400   20.9000 -109.6900       6.6        28       104        60
OIR    2025250     91400   20.9000 -109.7000       6.6        28       104        60
OIR    2025250     91400   20.9000 -109.7100       6.5        28       104        60
OIR    2025250     91400   20.9000 -109.7200       6.4        28       104        60
OIR    2025250     91400   20.9000 -109.7300       6.2        28       104        60
OIR    2025250     91400   20.9000 -109.7400       6.1        28       104        60
OIR    2025250     91400   20.9000 -109.7500       6.0        27       104        60
OIR    2025250     91400   20.9000 -109.7600       5.7        26       104        60
OIR    2025250     91400   20.9000 -109.7700       5.5        26       104        60
OIR    2025250     91400   20.9000 -109.7800       5.4        25       104        60
OIR    2025250     91400   20.9000 -109.7900       5.3        25       104        60
OIR    2025250     91400   20.9000 -109.8000       5.1        24       104        60
OIR    2025250     91400   20.9000 -109.8100       5.0        23       103        60
OIR    2025250     91400   20.9000 -109.8200       4.8        21       104        60
OIR    2025250     91400   20.9000 -109.8300       4.6        21       104        60
OIR    2025250     91400   20.9000 -109.8400       4.5        20       104        60
OIR    2025250     91400   20.9000 -109.8500       4.3        20       107        60
OIR    2025250     91400   20.9000 -109.8600       4.2        20       109        60
OIR    2025250     91400   20.9000 -109.8700       4.1        20       110        60
OIR    2025250     91400   20.9000 -109.8800       4.0        21       111        60
OIR    2025250     91400   20.9000 -115.1100      28.0       190       135        60
OIR    2025250     91400   20.8900 -109.0000      10.7        49       137        60
OIR    2025250     91400   20.8900 -109.0100       9.5        43       132        60
OIR    2025250     91400   20.8900 -109.0200       9.1        41       128        60
OIR    2025250     91400   20.8900 -109.0300       9.1        40       123        60
OIR    2025250     91400   20.8900 -109.0400       9.1        40       122        60
OIR    2025250     91400   20.8900 -109.0500       9.1        40       120        60
OIR    2025250     91400   20.8900 -109.0600       9.1        39       117        60
OIR    2025250     91400   20.8900 -109.0700       9.1        38       116        60
OIR    2025250     91400   20.8900 -109.0800       9.1        38       114        60
OIR    2025250     91400   20.8900 -109.0900       9.1        38       111        60
OIR    2025250     91400   20.8900 -109.1000       9.1        38       109        60
OIR    2025250     91400   20.8900 -109.1100       9.1        38       109        60
OIR    2025250     91400   20.8900 -109.1200       9.1        38       110        60
OIR    2025250     91400   20.8900 -109.1300       9.0        38       110        60
OIR    2025250     91400   20.8900 -109.1400       9.0        37       109        60
OIR    2025250     91400   20.8900 -109.1500       9.0        37       109        60
OIR    2025250     91400   20.8900 -109.1600       9.0        37       108        60
OIR    2025250     91400   20.8900 -109.1700       9.0        37       105        60
OIR    2025250     91400   20.8900 -109.1800       8.9        36       105        60
OIR    2025250     91400   20.8900 -109.1900       8.9        36       105        60
OIR    2025250     91400   20.8900 -109.2000       8.9        36       104        60
OIR    2025250     91400   20.8900 -109.2100       8.9        36       104        60
OIR    2025250     91400   20.8900 -109.2200       8.9        36       105        60
OIR    2025250     91400   20.8900 -109.2300       8.9        36       107        60
OIR    2025250     91400   20.8900 -109.2400       8.9        36       108        60
OIR    2025250     91400   20.8900 -109.2500       8.9        36       110        60
OIR    2025250     91400   20.8900 -109.2600       8.9        35       110        60
OIR    2025250     91400   20.8900 -109.2700       8.9        35       109        60
OIR    2025250     91400   20.8900 -109.2800       8.9        35       108        60
OIR    2025250     91400   20.8900 -109.2900       8.9        35       105        60
OIR    2025250     91400   20.8900 -109.3000       8.9        35       104        60
OIR    2025250     91400   20.8900 -109.3100       8.8        35       104        60
OIR    2025250     91400   20.8900 -109.3200       8.8        35       105        60
OIR    2025250     91400   20.8900 -109.3300       8.8        35       107        60
OIR    2025250     91400   20.8900 -109.3400       8.8        35       107        60
OIR    2025250     91400   20.8900 -109.3500       8.8        35       108        60
OIR    2025250     91400   20.8900 -109.3600       8.8        35       107        60
OIR    2025250     91400   20.8900 -109.3700       8.8        35       105        60
OIR    2025250     91400   20.8900 -109.3800       8.8        35       105        60
OIR    2025250     91400   20.8900 -109.3900       8.8        35       107        60
OIR    2025250     91400   20.8900 -109.4000       8.8        34       108        60
OIR    2025250     91400   20.8900 -109.4100       8.7        34       105        60
OIR    2025250     91400   20.8900 -109.4200       8.6        34       104        60
OIR    2025250     91400   20.8900 -109.4300       8.5        34       104        60
OIR    2025250     91400   20.8900 -109.4400       8.4        34       104        60
OIR    2025250     91400   20.8900 -109.4500       8.3        34       104        60
OIR    2025250     91400   20.8900 -109.4600       8.3        34       104        60
OIR    2025250     91400   20.8900 -109.4700       8.3        34       104        60
OIR    2025250     91400   20.8900 -109.4800       8.3        34       104        60
OIR    2025250     91400   20.8900 -109.4900       8.3        34       104        60
OIR    2025250     91400   20.8900 -109.5000       8.2        34       104        60
OIR    2025250     91400   20.8900 -109.5100       8.1        34       104        60
OIR    2025250     91400   20.8900 -109.5200       8.1        34       104        60
OIR    2025250     91400   20.8900 -109.5300       7.9        34       104        60
OIR    2025250     91400   20.8900 -109.5400       7.9        34       104        60
OIR    2025250     91400   20.8900 -109.5500       7.8        34       105        60
OIR    2025250     91400   20.8900 -109.5600       7.8        34       107        60
OIR    2025250     91400   20.8900 -109.5700       7.8        34       107        60
OIR    2025250     91400   20.8900 -109.5800       7.8        33       109        60
OIR    2025250     91400   20.8900 -109.5900       7.7        33       112        60
OIR    2025250     91400   20.8900 -109.6000       7.7        31       113        60
OIR    2025250     91400   20.8900 -109.6100       7.6        29       112        60
OIR    2025250     91400   20.8900 -109.6200       7.4        27       112        60
OIR    2025250     91400   20.8900 -109.6300       7.3        26       110        60
OIR    2025250     91400   20.8900 -109.6400       7.1        26       108        60
OIR    2025250     91400   20.8900 -109.6500       7.0        27       107        60
OIR    2025250     91400   20.8900 -109.6600       6.9        27       105        60
OIR    2025250     91400   20.8900 -109.6700       6.9        28       105        60
OIR    2025250     91400   20.8900 -109.6800       6.9        28       104        60
OIR    2025250     91400   20.8900 -109.6900       6.8        29       104        60
OIR    2025250     91400   20.8900 -109.7000       6.8        29       104        60
OIR    2025250     91400   20.8900 -109.7100       6.8        30       104        60
OIR    2025250     91400   20.8900 -109.7200       6.8        30       104        60
OIR    2025250     91400   20.8900 -109.7300       6.7        29       104        60
OIR    2025250     91400   20.8900 -109.7400       6.5        29       105        60
OIR    2025250     91400   20.8900 -109.7500       6.4        29       105        60
OIR    2025250     91400   20.8900 -109.7600       6.1        28       105        60
OIR    2025250     91400   20.8900 -109.7700       5.8        27       105        60
OIR    2025250     91400   20.8900 -109.7800       5.5        26       104        60
OIR    2025250     91400   20.8900 -109.7900       5.4        26       104        60
OIR    2025250     91400   20.8900 -109.8000       5.2        25       104        60
OIR    2025250     91400   20.8900 -109.8100       5.1        25       104        60
OIR    2025250     91400   20.8900 -109.8200       4.9        24       104        60
OIR    2025250     91400   20.8900 -109.8300       4.7        23       104        60
OIR    2025250     91400   20.8900 -109.8400       4.6        23       105        60
OIR    2025250     91400   20.8900 -109.8500       4.5        23       108        60
OIR    2025250     91400   20.8900 -109.8600       4.4        23       110        60
OIR    2025250     91400   20.8900 -109.8700       4.3        24       111        60
OIR    2025250     91400   20.8900 -109.8800       4.1        24       112        60
OIR    2025250     91400   20.8900 -109.8900       4.1        25       112        60
OIR    2025250     91400   20.8900 -109.9000       4.0        26       113        60
OIR    2025250     91400   20.8900 -110.1600       4.2       100       134        60
OIR    2025250     91400   20.8800 -109.0100      10.0        45       135        60
OIR    2025250     91400   20.8800 -109.0200       9.2        40       129        60
OIR    2025250     91400   20.8800 -109.0300       9.1        40       123        60
OIR    2025250     91400   20.8800 -109.0400       9.1        40       121        60
OIR    2025250     91400   20.8800 -109.0500       9.1        39       120        60
OIR    2025250     91400   20.8800 -109.0600       9.1        38       117        60
OIR    2025250     91400   20.8800 -109.0700       9.1        38       116        60
OIR    2025250     91400   20.8800 -109.0800       9.1        38       114        60
OIR    2025250     91400   20.8800 -109.0900       9.1        38       112        60
OIR    2025250     91400   20.8800 -109.1000       9.1        38       109        60
OIR    2025250     91400   20.8800 -109.1100       9.1        38       109        60
OIR    2025250     91400   20.8800 -109.1200       9.0        38       109        60
OIR    2025250     91400   20.8800 -109.1300       9.0        38       109        60
OIR    2025250     91400   20.8800 -109.1400       9.0        37       109        60
OIR    2025250     91400   20.8800 -109.1500       9.0        37       109        60
OIR    2025250     91400   20.8800 -109.1600       9.0        37       108        60
OIR    2025250     91400   20.8800 -109.1700       8.9        37       107        60
OIR    2025250     91400   20.8800 -109.1800       8.9        36       105        60
OIR    2025250     91400   20.8800 -109.1900       8.9        36       105        60
OIR    2025250     91400   20.8800 -109.2000       8.9        36       105        60
OIR    2025250     91400   20.8800 -109.2100       8.9        36       107        60
OIR    2025250     91400   20.8800 -109.2200       8.9        36       107        60
OIR    2025250     91400   20.8800 -109.2300       8.9        36       107        60
OIR    2025250     91400   20.8800 -109.2400       8.9        36       108        60
OIR    2025250     91400   20.8800 -109.2500       8.9        35       108        60
OIR    2025250     91400   20.8800 -109.2600       8.9        35       108        60
OIR    2025250     91400   20.8800 -109.2700       8.9        35       107        60
OIR    2025250     91400   20.8800 -109.2800       8.9        35       105        60
OIR    2025250     91400   20.8800 -109.2900       8.9        35       105        60
OIR    2025250     91400   20.8800 -109.3000       8.9        35       104        60
OIR    2025250     91400   20.8800 -109.3100       8.9        35       104        60
OIR    2025250     91400   20.8800 -109.3200       8.9        35       104        60
OIR    2025250     91400   20.8800 -109.3300       8.9        35       105        60
OIR    2025250     91400   20.8800 -109.3400       8.8        35       107        60
OIR    2025250     91400   20.8800 -109.3500       8.8        35       107        60
OIR    2025250     91400   20.8800 -109.3600       8.8        35       107        60
OIR    2025250     91400   20.8800 -109.3700       8.8        35       107        60
OIR    2025250     91400   20.8800 -109.3800       8.8        35       107        60
OIR    2025250     91400   20.8800 -109.3900       8.8        35       108        60
OIR    2025250     91400   20.8800 -109.4000       8.8        34       108        60
OIR    2025250     91400   20.8800 -109.4100       8.8        34       107        60
OIR    2025250     91400   20.8800 -109.4200       8.7        34       104        60
OIR    2025250     91400   20.8800 -109.4300       8.7        34       104        60
OIR    2025250     91400   20.8800 -109.4400       8.6        34       104        60
OIR    2025250     91400   20.8800 -109.4500       8.4        34       104        60
OIR    2025250     91400   20.8800 -109.4600       8.4        34       104        60
OIR    2025250     91400   20.8800 -109.4700       8.3        34       104        60
OIR    2025250     91400   20.8800 -109.4800       8.3        34       104        60
OIR    2025250     91400   20.8800 -109.4900       8.3        34       104        60
OIR    2025250     91400   20.8800 -109.5000       8.3        34       104        60
OIR    2025250     91400   20.8800 -109.5100       8.2        34       104        60
OIR    2025250     91400   20.8800 -109.5200       8.2        34       103        60
OIR    2025250     91400   20.8800 -109.5300       8.2        33       104        60
OIR    2025250     91400   20.8800 -109.5400       8.1        33       104        60
OIR    2025250     91400   20.8800 -109.5500       8.1        34       105        60
OIR    2025250     91400   20.8800 -109.5600       8.1        34       108        60
OIR    2025250     91400   20.8800 -109.5700       8.0        34       109        60
OIR    2025250     91400   20.8800 -109.5800       8.0        33       110        60
OIR    2025250     91400   20.8800 -109.5900       8.0        32       112        60
OIR    2025250     91400   20.8800 -109.6000       7.9        32       113        60
OIR    2025250     91400   20.8800 -109.6100       7.8        30       112        60
OIR    2025250     91400   20.8800 -109.6200       7.8        29       111        60
OIR    2025250     91400   20.8800 -109.6300       7.6        28       109        60
OIR    2025250     91400   20.8800 -109.6400       7.5        28       108        60
OIR    2025250     91400   20.8800 -109.6500       7.3        28       105        60
OIR    2025250     91400   20.8800 -109.6600       7.1        29       105        60
OIR    2025250     91400   20.8800 -109.6700       7.0        29       105        60
OIR    2025250     91400   20.8800 -109.6800       7.0        30       104        60
OIR    2025250     91400   20.8800 -109.6900       7.0        30       104        60
OIR    2025250     91400   20.8800 -109.7000       7.0        30       103        60
OIR    2025250     91400   20.8800 -109.7100       7.0        30       103        60
OIR    2025250     91400   20.8800 -109.7200       7.0        31       103        60
OIR    2025250     91400   20.8800 -109.7300       7.0        31       104        60
OIR    2025250     91400   20.8800 -109.7400       6.9        30       104        60
OIR    2025250     91400   20.8800 -109.7500       6.8        30       104        60
OIR    2025250     91400   20.8800 -109.7600       6.6        30       105        60
OIR    2025250     91400   20.8800 -109.7700       6.3        29       105        60
OIR    2025250     91400   20.8800 -109.7800       5.9        28       104        60
OIR    2025250     91400   20.8800 -109.7900       5.6        27       104        60
OIR    2025250     91400   20.8800 -109.8000       5.4        27       103        60
OIR    2025250     91400   20.8800 -109.8100       5.2        26       103        60
OIR    2025250     91400   20.8800 -109.8200       5.1        26       103        60
OIR    2025250     91400   20.8800 -109.8300       4.9        25       104        60
OIR    2025250     91400   20.8800 -109.8400       4.7        25       107        60
OIR    2025250     91400   20.8800 -109.8500       4.6        25       108        60
OIR    2025250     91400   20.8800 -109.8600       4.5        25       110        60
OIR    2025250     91400   20.8800 -109.8700       4.4        26       112        60
OIR    2025250     91400   20.8800 -109.8800       4.3        27       113        60
OIR    2025250     91400   20.8800 -109.8900       4.3        28       113        60
OIR    2025250     91400   20.8800 -109.9000       4.2        29       113        60
OIR    2025250     91400   20.8800 -109.9100       4.1        31       113        60
OIR    2025250     91400   20.8800 -109.9200       4.0        33       112        60
OIR    2025250     91400   20.8800 -110.1400       4.0        86       134        60
OIR    2025250     91400   20.8800 -110.1500       5.0       101       137        60
OIR    2025250     91400   20.8800 -110.1600       5.3       107       139        60
OIR    2025250     91400   20.8700 -109.0100      10.5        48       139        60
OIR    2025250     91400   20.8700 -109.0200       9.1        41       132        60
OIR    2025250     91400   20.8700 -109.0300       9.1        41       126        60
OIR    2025250     91400   20.8700 -109.0400       9.2        40       122        60
OIR    2025250     91400   20.8700 -109.0500       9.1        39       120        60
OIR    2025250     91400   20.8700 -109.0600       9.1        38       117        60
OIR    2025250     91400   20.8700 -109.0700       9.1        38       116        60
OIR    2025250     91400   20.8700 -109.0800       9.1        38       114        60
OIR    2025250     91400   20.8700 -109.0900       9.1        38       112        60
OIR    2025250     91400   20.8700 -109.1000       9.1        38       110        60
OIR    2025250     91400   20.8700 -109.1100       9.1        38       109        60
OIR    2025250     91400   20.8700 -109.1200       9.0        38       108        60
OIR    2025250     91400   20.8700 -109.1300       9.0        38       108        60
OIR    2025250     91400   20.8700 -109.1400       9.0        37       108        60
OIR    2025250     91400   20.8700 -109.1500       9.0        37       109        60
OIR    2025250     91400   20.8700 -109.1600       8.9        37       108        60
OIR    2025250     91400   20.8700 -109.1700       8.9        37       108        60
OIR    2025250     91400   20.8700 -109.1800       8.9        36       107        60
OIR    2025250     91400   20.8700 -109.1900       8.9        36       107        60
OIR    2025250     91400   20.8700 -109.2000       8.9        36       107        60
OIR    2025250     91400   20.8700 -109.2100       8.9        36       107        60
OIR    2025250     91400   20.8700 -109.2200       8.9        36       108        60
OIR    2025250     91400   20.8700 -109.2300       8.9        36       108        60
OIR    2025250     91400   20.8700 -109.2400       8.9        36       108        60
OIR    2025250     91400   20.8700 -109.2500       8.9        35       107        60
OIR    2025250     91400   20.8700 -109.2600       8.9        35       105        60
OIR    2025250     91400   20.8700 -109.2700       8.9        35       104        60
OIR    2025250     91400   20.8700 -109.2800       8.9        35       104        60
OIR    2025250     91400   20.8700 -109.2900       8.9        35       104        60
OIR    2025250     91400   20.8700 -109.3000       8.9        35       104        60
OIR    2025250     91400   20.8700 -109.3100       8.9        35       104        60
OIR    2025250     91400   20.8700 -109.3200       8.9        35       104        60
OIR    2025250     91400   20.8700 -109.3300       8.9        35       105        60
OIR    2025250     91400   20.8700 -109.3400       8.9        35       105        60
OIR    2025250     91400   20.8700 -109.3500       8.9        35       107        60
OIR    2025250     91400   20.8700 -109.3600       8.9        35       108        60
OIR    2025250     91400   20.8700 -109.3700       8.8        35       108        60
OIR    2025250     91400   20.8700 -109.3800       8.8        35       109        60
OIR    2025250     91400   20.8700 -109.3900       8.8        34       109        60
OIR    2025250     91400   20.8700 -109.4000       8.8        34       110        60
OIR    2025250     91400   20.8700 -109.4100       8.8        34       108        60
OIR    2025250     91400   20.8700 -109.4200       8.8        34       105        60
OIR    2025250     91400   20.8700 -109.4300       8.7        34       104        60
OIR    2025250     91400   20.8700 -109.4400       8.6        34       104        60
OIR    2025250     91400   20.8700 -109.4500       8.5        34       104        60
OIR    2025250     91400   20.8700 -109.4600       8.4        34       104        60
OIR    2025250     91400   20.8700 -109.4700       8.4        34       104        60
OIR    2025250     91400   20.8700 -109.4800       8.3        34       104        60
OIR    2025250     91400   20.8700 -109.4900       8.3        34       104        60
OIR    2025250     91400   20.8700 -109.5000       8.3        34       104        60
OIR    2025250     91400   20.8700 -109.5100       8.3        34       104        60
OIR    2025250     91400   20.8700 -109.5200       8.3        34       104        60
OIR    2025250     91400   20.8700 -109.5300       8.2        33       104        60
OIR    2025250     91400   20.8700 -109.5400       8.2        33       105        60
OIR    2025250     91400   20.8700 -109.5500       8.2        33       108        60
OIR    2025250     91400   20.8700 -109.5600       8.2        33       109        60
OIR    2025250     91400   20.8700 -109.5700       8.2        33       110        60
OIR    2025250     91400   20.8700 -109.5800       8.1        33       110        60
OIR    2025250     91400   20.8700 -109.5900       8.1        33       111        60
OIR    2025250     91400   20.8700 -109.6000       8.1        32       111        60
OIR    2025250     91400   20.8700 -109.6100       8.0        31       111        60
OIR    2025250     91400   20.8700 -109.6200       8.0        30       110        60
OIR    2025250     91400   20.8700 -109.6300       7.9        30       109        60
OIR    2025250     91400   20.8700 -109.6400       7.7        30       108        60
OIR    2025250     91400   20.8700 -109.6500       7.5        30       105        60
OIR    2025250     91400   20.8700 -109.6600       7.4        30       105        60
OIR    2025250     91400   20.8700 -109.6700       7.2        30       104        60
OIR    2025250     91400   20.8700 -109.6800       7.2        30       104        60
OIR    2025250     91400   20.8700 -109.6900       7.1        30       104        60
OIR    2025250     91400   20.8700 -109.7000       7.1        31       103        60
OIR    2025250     91400   20.8700 -109.7100       7.1        31       103        60
OIR    2025250     91400   20.8700 -109.7200       7.1        31       103        60
OIR    2025250     91400   20.8700 -109.7300       7.1        31       103        60
OIR    2025250     91400   20.8700 -109.7400       7.1        31       104        60
OIR    2025250     91400   20.8700 -109.7500       7.0        31       104        60
OIR    2025250     91400   20.8700 -109.7600       6.9        31       104        60
OIR    2025250     91400   20.8700 -109.7700       6.7        31       105        60
OIR    2025250     91400   20.8700 -109.7800       6.4        30       104        60
OIR    2025250     91400   20.8700 -109.7900       6.1        30       104        60
OIR    2025250     91400   20.8700 -109.8000       5.7        29       103        60
OIR    2025250     91400   20.8700 -109.8100       5.5        28       103        60
OIR    2025250     91400   20.8700 -109.8200       5.2        28       103        60
OIR    2025250     91400   20.8700 -109.8300       5.1        27       104        60
OIR    2025250     91400   20.8700 -109.8400       4.9        27       107        60
OIR    2025250     91400   20.8700 -109.8500       4.7        27       109        60
OIR    2025250     91400   20.8700 -109.8600       4.6        28       111        60
OIR    2025250     91400   20.8700 -109.8700       4.5        28       113        60
OIR    2025250     91400   20.8700 -109.8800       4.5        29       114        60
OIR    2025250     91400   20.8700 -109.8900       4.4        30       115        60
OIR    2025250     91400   20.8700 -109.9000       4.4        32       114        60
OIR    2025250     91400   20.8700 -109.9100       4.3        33       112        60
OIR    2025250     91400   20.8700 -109.9200       4.2        35       110        60
OIR    2025250     91400   20.8700 -109.9300       4.2        36       112        60
OIR    2025250     91400   20.8700 -109.9400       4.1        37       113        60
OIR    2025250     91400   20.8700 -109.9500       4.0        39       114        60
OIR    2025250     91400   20.8700 -109.9600       4.0        40       114        60
OIR    2025250     91400   20.8700 -110.1300       4.3        85       132        60
OIR    2025250     91400   20.8700 -110.1400       5.9        99       136        60
OIR    2025250     91400   20.8700 -110.1500       7.1       107       140        60
OIR    2025250     91400   20.8600 -109.0200       9.8        48       136        60
OIR    2025250     91400   20.8600 -109.0300       9.2        48       129        60
OIR    2025250     91400   20.8600 -109.0400       9.4        41       123        60
OIR    2025250     91400   20.8600 -109.0500       9.3        39       121        60
OIR    2025250     91400   20.8600 -109.0600       9.1        38       117        60
OIR    2025250     91400   20.8600 -109.0700       9.1        38       116        60
OIR    2025250     91400   20.8600 -109.0800       9.1        38       113        60
OIR    2025250     91400   20.8600 -109.0900       9.1        38       112        60
OIR    2025250     91400   20.8600 -109.1000       9.1        38       110        60
OIR    2025250     91400   20.8600 -109.1100       9.0        38       109        60
OIR    2025250     91400   20.8600 -109.1200       9.0        38       107        60
OIR    2025250     91400   20.8600 -109.1300       9.0        38       105        60
OIR    2025250     91400   20.8600 -109.1400       9.0        38       105        60
OIR    2025250     91400   20.8600 -109.1500       8.9        37       107        60
OIR    2025250     91400   20.8600 -109.1600       8.9        37       107        60
OIR    2025250     91400   20.8600 -109.1700       8.9        37       107        60
OIR    2025250     91400   20.8600 -109.1800       8.9        36       107        60
OIR    2025250     91400   20.8600 -109.1900       8.9        36       107        60
OIR    2025250     91400   20.8600 -109.2000       8.9        36       105        60
OIR    2025250     91400   20.8600 -109.2100       8.9        36       105        60
OIR    2025250     91400   20.8600 -109.2200       8.9        36       105        60
OIR    2025250     91400   20.8600 -109.2300       8.9        36       105        60
OIR    2025250     91400   20.8600 -109.2400       8.9        35       105        60
OIR    2025250     91400   20.8600 -109.2500       8.9        35       105        60
OIR    2025250     91400   20.8600 -109.2600       8.9        35       105        60
OIR    2025250     91400   20.8600 -109.2700       8.9        35       104        60
OIR    2025250     91400   20.8600 -109.2800       8.9        35       104        60
OIR    2025250     91400   20.8600 -109.2900       8.9        35       104        60
OIR    2025250     91400   20.8600 -109.3000       8.9        35       104        60
OIR    2025250     91400   20.8600 -109.3100       8.9        35       104        60
OIR    2025250     91400   20.8600 -109.3200       8.9        35       104        60
OIR    2025250     91400   20.8600 -109.3300       8.9        35       104        60
OIR    2025250     91400   20.8600 -109.3400       8.9        35       105        60
OIR    2025250     91400   20.8600 -109.3500       8.9        35       107        60
OIR    2025250     91400   20.8600 -109.3600       8.9        35       107        60
OIR    2025250     91400   20.8600 -109.3700       8.9        35       108        60
OIR    2025250     91400   20.8600 -109.3800       8.9        35       109        60
OIR    2025250     91400   20.8600 -109.3900       8.9        34       109        60
OIR    2025250     91400   20.8600 -109.4000       8.8        34       109        60
OIR    2025250     91400   20.8600 -109.4100       8.8        34       109        60
OIR    2025250     91400   20.8600 -109.4200       8.8        34       107        60
OIR    2025250     91400   20.8600 -109.4300       8.8        34       104        60
OIR    2025250     91400   20.8600 -109.4400       8.7        34       104        60
OIR    2025250     91400   20.8600 -109.4500       8.6        34       104        60
OIR    2025250     91400   20.8600 -109.4600       8.5        34       104        60
OIR    2025250     91400   20.8600 -109.4700       8.4        34       104        60
OIR    2025250     91400   20.8600 -109.4800       8.4        34       105        60
OIR    2025250     91400   20.8600 -109.4900       8.3        34       104        60
OIR    2025250     91400   20.8600 -109.5000       8.3        34       104        60
OIR    2025250     91400   20.8600 -109.5100       8.3        34       104        60
OIR    2025250     91400   20.8600 -109.5200       8.3        33       104        60
OIR    2025250     91400   20.8600 -109.5300       8.3        33       104        60
OIR    2025250     91400   20.8600 -109.5400       8.3        33       107        60
OIR    2025250     91400   20.8600 -109.5500       8.2        33       109        60
OIR    2025250     91400   20.8600 -109.5600       8.2        33       110        60
OIR    2025250     91400   20.8600 -109.5700       8.2        33       111        60
OIR    2025250     91400   20.8600 -109.5800       8.2        33       111        60
OIR    2025250     91400   20.8600 -109.5900       8.2        33       110        60
OIR    2025250     91400   20.8600 -109.6000       8.2        32       108        60
OIR    2025250     91400   20.8600 -109.6100       8.1        32       108        60
OIR    2025250     91400   20.8600 -109.6200       8.1        31       109        60
OIR    2025250     91400   20.8600 -109.6300       8.0        31       109        60
OIR    2025250     91400   20.8600 -109.6400       7.9        31       108        60
OIR    2025250     91400   20.8600 -109.6500       7.8        31       105        60
OIR    2025250     91400   20.8600 -109.6600       7.6        31       104        60
OIR    2025250     91400   20.8600 -109.6700       7.4        31       104        60
OIR    2025250     91400   20.8600 -109.6800       7.3        31       104        60
OIR    2025250     91400   20.8600 -109.6900       7.2        31       103        60
OIR    2025250     91400   20.8600 -109.7000       7.2        31       103        60
OIR    2025250     91400   20.8600 -109.7100       7.2        31       103        60
OIR    2025250     91400   20.8600 -109.7200       7.1        31       103        60
OIR    2025250     91400   20.8600 -109.7300       7.1        31       103        60
OIR    2025250     91400   20.8600 -109.7400       7.1        31       103        60
OIR    2025250     91400   20.8600 -109.7500       7.1        31       104        60
OIR    2025250     91400   20.8600 -109.7600       7.0        31       104        60
OIR    2025250     91400   20.8600 -109.7700       6.9        31       104        60
OIR    2025250     91400   20.8600 -109.7800       6.7        31       104        60
OIR    2025250     91400   20.8600 -109.7900       6.4        31       104        60
OIR    2025250     91400   20.8600 -109.8000       6.1        31       103        60
OIR    2025250     91400   20.8600 -109.8100       5.9        31       103        60
OIR    2025250     91400   20.8600 -109.8200       5.6        30       104        60
OIR    2025250     91400   20.8600 -109.8300       5.3        30       104        60
OIR    2025250     91400   20.8600 -109.8400       5.2        29       107        60
OIR    2025250     91400   20.8600 -109.8500       5.0        30       109        60
OIR    2025250     91400   20.8600 -109.8600       4.8        30       111        60
OIR    2025250     91400   20.8600 -109.8700       4.7        30       113        60
OIR    2025250     91400   20.8600 -109.8800       4.7        31       114        60
OIR    2025250     91400   20.8600 -109.8900       4.6        32       115        60
OIR    2025250     91400   20.8600 -109.9000       4.5        33       115        60
OIR    2025250     91400   20.8600 -109.9100       4.5        35       113        60
OIR    2025250     91400   20.8600 -109.9200       4.4        36       112        60
OIR    2025250     91400   20.8600 -109.9300       4.4        38       112        60
OIR    2025250     91400   20.8600 -109.9400       4.3        39       113        60
OIR    2025250     91400   20.8600 -109.9500       4.2        40       114        60
OIR    2025250     91400   20.8600 -109.9600       4.2        41       115        60
OIR    2025250     91400   20.8600 -109.9700       4.1        43       115        60
OIR    2025250     91400   20.8600 -109.9800       4.0        45       115        60
OIR    2025250     91400   20.8600 -110.0700       4.0        54       116        60
OIR    2025250     91400   20.8600 -110.0800       4.1        56       119        60
OIR    2025250     91400   20.8600 -110.0900       4.2        59       121        60
OIR    2025250     91400   20.8600 -110.1000       4.2        63       123        60
OIR    2025250     91400   20.8600 -110.1100       4.3        70       125        60
OIR    2025250     91400   20.8600 -110.1200       4.7        78       128        60
OIR    2025250     91400   20.8600 -110.1300       5.6        91       133        60
OIR    2025250     91400   20.8600 -110.1400       7.4       104       137        60
OIR    2025250     91400   20.8500 -109.0200      13.4        60       140        60
OIR    2025250     91400   20.8500 -109.0300      10.9        53       132        60
OIR    2025250     91400   20.8500 -109.0400      10.3        43       124        60
OIR    2025250     91400   20.8500 -109.0500       9.7        41       121        60
OIR    2025250     91400   20.8500 -109.0600       9.2        38       117        60
OIR    2025250     91400   20.8500 -109.0700       9.1        38       116        60
OIR    2025250     91400   20.8500 -109.0800       9.1        38       114        60
OIR    2025250     91400   20.8500 -109.0900       9.1        38       112        60
OIR    2025250     91400   20.8500 -109.1000       9.0        38       110        60
OIR    2025250     91400   20.8500 -109.1100       9.0        38       109        60
OIR    2025250     91400   20.8500 -109.1200       9.0        38       107        60
OIR    2025250     91400   20.8500 -109.1300       8.9        38       105        60
OIR    2025250     91400   20.8500 -109.1400       8.9        38       104        60
OIR    2025250     91400   20.8500 -109.1500       8.9        37       105        60
OIR    2025250     91400   20.8500 -109.1600       8.9        37       107        60
OIR    2025250     91400   20.8500 -109.1700       8.9        37       107        60
OIR    2025250     91400   20.8500 -109.1800       8.9        36       107        60
OIR    2025250     91400   20.8500 -109.1900       8.9        36       107        60
OIR    2025250     91400   20.8500 -109.2000       8.9        36       105        60
OIR    2025250     91400   20.8500 -109.2100       8.9        36       104        60
OIR    2025250     91400   20.8500 -109.2200       8.9        36       104        60
OIR    2025250     91400   20.8500 -109.2300       8.9        36       104        60
OIR    2025250     91400   20.8500 -109.2400       8.9        35       104        60
OIR    2025250     91400   20.8500 -109.2500       8.9        35       104        60
OIR    2025250     91400   20.8500 -109.2600       8.9        35       104        60
OIR    2025250     91400   20.8500 -109.2700       8.9        35       104        60
OIR    2025250     91400   20.8500 -109.2800       8.9        35       104        60
OIR    2025250     91400   20.8500 -109.2900       8.9        35       103        60
OIR    2025250     91400   20.8500 -109.3000       8.9        35       103        60
OIR    2025250     91400   20.8500 -109.3100       8.9        35       103        60
OIR    2025250     91400   20.8500 -109.3200       8.9        35       104        60
OIR    2025250     91400   20.8500 -109.3300       8.9        35       104        60
OIR    2025250     91400   20.8500 -109.3400       8.9        35       105        60
OIR    2025250     91400   20.8500 -109.3500       8.9        35       105        60
OIR    2025250     91400   20.8500 -109.3600       8.9        35       107        60
OIR    2025250     91400   20.8500 -109.3700       8.9        35       107        60
OIR    2025250     91400   20.8500 -109.3800       8.9        35       107        60
OIR    2025250     91400   20.8500 -109.3900       8.9        34       107        60
OIR    2025250     91400   20.8500 -109.4000       8.9        34       108        60
OIR    2025250     91400   20.8500 -109.4100       8.8        34       108        60
OIR    2025250     91400   20.8500 -109.4200       8.8        34       107        60
OIR    2025250     91400   20.8500 -109.4300       8.8        34       105        60
OIR    2025250     91400   20.8500 -109.4400       8.7        34       104        60
OIR    2025250     91400   20.8500 -109.4500       8.7        34       105        60
OIR    2025250     91400   20.8500 -109.4600       8.6        34       105        60
OIR    2025250     91400   20.8500 -109.4700       8.5        34       104        60
OIR    2025250     91400   20.8500 -109.4800       8.4        34       104        60
OIR    2025250     91400   20.8500 -109.4900       8.4        34       104        60
OIR    2025250     91400   20.8500 -109.5000       8.3        34       104        60
OIR    2025250     91400   20.8500 -109.5100       8.3        34       104        60
OIR    2025250     91400   20.8500 -109.5200       8.3        33       104        60
OIR    2025250     91400   20.8500 -109.5300       8.3        33       105        60
OIR    2025250     91400   20.8500 -109.5400       8.3        33       108        60
OIR    2025250     91400   20.8500 -109.5500       8.3        33       110        60
OIR    2025250     91400   20.8500 -109.5600       8.3        33       111        60
OIR    2025250     91400   20.8500 -109.5700       8.3        33       111        60
OIR    2025250     91400   20.8500 -109.5800       8.2        33       111        60
OIR    2025250     91400   20.8500 -109.5900       8.2        33       110        60
OIR    2025250     91400   20.8500 -109.6000       8.2        32       109        60
OIR    2025250     91400   20.8500 -109.6100       8.2        32       108        60
OIR    2025250     91400   20.8500 -109.6200       8.1        32       108        60
OIR    2025250     91400   20.8500 -109.6300       8.1        32       109        60
OIR    2025250     91400   20.8500 -109.6400       8.0        32       108        60
OIR    2025250     91400   20.8500 -109.6500       7.9        32       105        60
OIR    2025250     91400   20.8500 -109.6600       7.7        32       104        60
OIR    2025250     91400   20.8500 -109.6700       7.5        32       104        60
OIR    2025250     91400   20.8500 -109.6800       7.4        31       103        60
OIR    2025250     91400   20.8500 -109.6900       7.3        31       103        60
OIR    2025250     91400   20.8500 -109.7000       7.3        32       103        60
OIR    2025250     91400   20.8500 -109.7100       7.2        32       103        60
OIR    2025250     91400   20.8500 -109.7200       7.2        32       103        60
OIR    2025250     91400   20.8500 -109.7300       7.2        32       103        60
OIR    2025250     91400   20.8500 -109.7400       7.1        32       103        60
OIR    2025250     91400   20.8500 -109.7500       7.1        32       103        60
OIR    2025250     91400   20.8500 -109.7600       7.1        32       103        60
OIR    2025250     91400   20.8500 -109.7700       7.0        32       103        60
OIR    2025250     91400   20.8500 -109.7800       6.9        32       103        60
OIR    2025250     91400   20.8500 -109.7900       6.6        32       103        60
OIR    2025250     91400   20.8500 -109.8000       6.3        32       103        60
OIR    2025250     91400   20.8500 -109.8100       6.1        32       104        60
OIR    2025250     91400   20.8500 -109.8200       5.8        32       104        60
OIR    2025250     91400   20.8500 -109.8300       5.6        32       104        60
OIR    2025250     91400   20.8500 -109.8400       5.4        32       107        60
OIR    2025250     91400   20.8500 -109.8500       5.2        32       110        60
OIR    2025250     91400   20.8500 -109.8600       5.1        32       111        60
OIR    2025250     91400   20.8500 -109.8700       4.9        32       113        60
OIR    2025250     91400   20.8500 -109.8800       4.8        33       114        60
OIR    2025250     91400   20.8500 -109.8900       4.8        33       115        60
OIR    2025250     91400   20.8500 -109.9000       4.7        35       116        60
OIR    2025250     91400   20.8500 -109.9100       4.6        36       115        60
OIR    2025250     91400   20.8500 -109.9200       4.6        38       114        60
OIR    2025250     91400   20.8500 -109.9300       4.5        39       113        60
OIR    2025250     91400   20.8500 -109.9400       4.5        40       114        60
OIR    2025250     91400   20.8500 -109.9500       4.4        41       115        60
OIR    2025250     91400   20.8500 -109.9600       4.3        42       116        60
OIR    2025250     91400   20.8500 -109.9700       4.2        43       116        60
OIR    2025250     91400   20.8500 -109.9800       4.2        45       116        60
OIR    2025250     91400   20.8500 -109.9900       4.1        48       116        60
OIR    2025250     91400   20.8500 -110.0000       4.0        50       116        60
OIR    2025250     91400   20.8500 -110.0100       4.0        51       116        60
OIR    2025250     91400   20.8500 -110.0200       4.0        52       115        60
OIR    2025250     91400   20.8500 -110.0300       4.0        53       115        60
OIR    2025250     91400   20.8500 -110.0400       4.0        54       115        60
OIR    2025250     91400   20.8500 -110.0500       4.0        54       115        60
OIR    2025250     91400   20.8500 -110.0600       4.1        54       116        60
OIR    2025250     91400   20.8500 -110.0700       4.3        55       117        60
OIR    2025250     91400   20.8500 -110.0800       4.3        57       120        60
OIR    2025250     91400   20.8500 -110.0900       4.5        60       122        60
OIR    2025250     91400   20.8500 -110.1000       4.6        66       124        60
OIR    2025250     91400   20.8500 -110.1100       5.0        76       126        60
OIR    2025250     91400   20.8500 -110.1200       5.4        82       129        60
OIR    2025250     91400   20.8500 -110.1300       6.2        90       134        60
OIR    2025250     91400   20.8500 -110.1400       7.7       101       141        60
OIR    2025250     91400   20.8400 -109.0300      12.5        49       134        60
OIR    2025250     91400   20.8400 -109.0400      11.1        44       125        60
OIR    2025250     91400   20.8400 -109.0500      10.4        42       121        60
OIR    2025250     91400   20.8400 -109.0600       9.4        38       117        60
OIR    2025250     91400   20.8400 -109.0700       9.3        38       116        60
OIR    2025250     91400   20.8400 -109.0800       9.1        39       115        60
OIR    2025250     91400   20.8400 -109.0900       9.1        39       113        60
OIR    2025250     91400   20.8400 -109.1000       9.0        39       111        60
OIR    2025250     91400   20.8400 -109.1100       9.0        39       109        60
OIR    2025250     91400   20.8400 -109.1200       8.9        39       108        60
OIR    2025250     91400   20.8400 -109.1300       8.9        39       107        60
OIR    2025250     91400   20.8400 -109.1400       8.8        38       105        60
OIR    2025250     91400   20.8400 -109.1500       8.8        37       105        60
OIR    2025250     91400   20.8400 -109.1600       8.8        37       107        60
OIR    2025250     91400   20.8400 -109.1700       8.8        36       107        60
OIR    2025250     91400   20.8400 -109.1800       8.8        36       107        60
OIR    2025250     91400   20.8400 -109.1900       8.8        36       107        60
OIR    2025250     91400   20.8400 -109.2000       8.8        36       105        60
OIR    2025250     91400   20.8400 -109.2100       8.8        36       105        60
OIR    2025250     91400   20.8400 -109.2200       8.9        36       104        60
OIR    2025250     91400   20.8400 -109.2300       8.9        35       104        60
OIR    2025250     91400   20.8400 -109.2400       8.9        35       104        60
OIR    2025250     91400   20.8400 -109.2500       8.9        35       104        60
OIR    2025250     91400   20.8400 -109.2600       8.9        35       104        60
OIR    2025250     91400   20.8400 -109.2700       8.9        35       104        60
OIR    2025250     91400   20.8400 -109.2800       8.9        35       104        60
OIR    2025250     91400   20.8400 -109.2900       8.9        35       103        60
OIR    2025250     91400   20.8400 -109.3000       8.9        35       103        60
OIR    2025250     91400   20.8400 -109.3100       8.9        35       103        60
OIR    2025250     91400   20.8400 -109.3200       8.9        35       104        60
OIR    2025250     91400   20.8400 -109.3300       8.9        35       104        60
OIR    2025250     91400   20.8400 -109.3400       8.9        35       104        60
OIR    2025250     91400   20.8400 -109.3500       8.9        35       105        60
OIR    2025250     91400   20.8400 -109.3600       8.9        35       105        60
OIR    2025250     91400   20.8400 -109.3700       8.9        35       105        60
OIR    2025250     91400   20.8400 -109.3800       8.9        34       105        60
OIR    2025250     91400   20.8400 -109.3900       8.9        34       105        60
OIR    2025250     91400   20.8400 -109.4000       8.9        34       105        60
OIR    2025250     91400   20.8400 -109.4100       8.8        34       107        60
OIR    2025250     91400   20.8400 -109.4200       8.8        34       107        60
OIR    2025250     91400   20.8400 -109.4300       8.8        34       105        60
OIR    2025250     91400   20.8400 -109.4400       8.8        34       105        60
OIR    2025250     91400   20.8400 -109.4500       8.7        34       105        60
OIR    2025250     91400   20.8400 -109.4600       8.6        34       105        60
OIR    2025250     91400   20.8400 -109.4700       8.5        34       105        60
OIR    2025250     91400   20.8400 -109.4800       8.5        34       104        60
OIR    2025250     91400   20.8400 -109.4900       8.4        34       104        60
OIR    2025250     91400   20.8400 -109.5000       8.4        34       104        60
OIR    2025250     91400   20.8400 -109.5100       8.3        34       104        60
OIR    2025250     91400   20.8400 -109.5200       8.3        33       105        60
OIR    2025250     91400   20.8400 -109.5300       8.3        33       107        60
OIR    2025250     91400   20.8400 -109.5400       8.3        33       109        60
OIR    2025250     91400   20.8400 -109.5500       8.3        33       111        60
OIR    2025250     91400   20.8400 -109.5600       8.3        33       113        60
OIR    2025250     91400   20.8400 -109.5700       8.3        33       112        60
OIR    2025250     91400   20.8400 -109.5800       8.3        33       111        60
OIR    2025250     91400   20.8400 -109.5900       8.2        33       111        60
OIR    2025250     91400   20.8400 -109.6000       8.2        32       110        60
OIR    2025250     91400   20.8400 -109.6100       8.2        32       109        60
OIR    2025250     91400   20.8400 -109.6200       8.1        32       109        60
OIR    2025250     91400   20.8400 -109.6300       8.1        32       109        60
OIR    2025250     91400   20.8400 -109.6400       8.0        32       108        60
OIR    2025250     91400   20.8400 -109.6500       8.0        32       105        60
OIR    2025250     91400   20.8400 -109.6600       7.8        32       104        60
OIR    2025250     91400   20.8400 -109.6700       7.6        32       104        60
OIR    2025250     91400   20.8400 -109.6800       7.5        32       103        60
OIR    2025250     91400   20.8400 -109.6900       7.4        32       103        60
OIR    2025250     91400   20.8400 -109.7000       7.3        32       103        60
OIR    2025250     91400   20.8400 -109.7100       7.3        32       103        60
OIR    2025250     91400   20.8400 -109.7200       7.2        32       103        60
OIR    2025250     91400   20.8400 -109.7300       7.2        32       103        60
OIR    2025250     91400   20.8400 -109.7400       7.2        32       103        60
OIR    2025250     91400   20.8400 -109.7500       7.1        32       103        60
OIR    2025250     91400   20.8400 -109.7600       7.1        32       103        60
OIR    2025250     91400   20.8400 -109.7700       7.1        32       103        60
OIR    2025250     91400   20.8400 -109.7800       7.0        32       103        60
OIR    2025250     91400   20.8400 -109.7900       6.7        33       103        60
OIR    2025250     91400   20.8400 -109.8000       6.4        33       103        60
OIR    2025250     91400   20.8400 -109.8100       6.2        33       103        60
OIR    2025250     91400   20.8400 -109.8200       6.0        34       104        60
OIR    2025250     91400   20.8400 -109.8300       5.8        34       104        60
OIR    2025250     91400   20.8400 -109.8400       5.6        34       105        60
OIR    2025250     91400   20.8400 -109.8500       5.4        34       108        60
OIR    2025250     91400   20.8400 -109.8600       5.3        34       110        60
OIR    2025250     91400   20.8400 -109.8700       5.2        34       112        60
OIR    2025250     91400   20.8400 -109.8800       5.1        35       113        60
OIR    2025250     91400   20.8400 -109.8900       5.1        36       114        60
OIR    2025250     91400   20.8400 -109.9000       4.9        37       114        60
OIR    2025250     91400   20.8400 -109.9100       4.8        37       114        60
OIR    2025250     91400   20.8400 -109.9200       4.7        38       113        60
OIR    2025250     91400   20.8400 -109.9300       4.6        39       113        60
OIR    2025250     91400   20.8400 -109.9400       4.6        40       114        60
OIR    2025250     91400   20.8400 -109.9500       4.5        41       115        60
OIR    2025250     91400   20.8400 -109.9600       4.4        42       116        60
OIR    2025250     91400   20.8400 -109.9700       4.4        43       116        60
OIR    2025250     91400   20.8400 -109.9800       4.3        45       116        60
OIR    2025250     91400   20.8400 -109.9900       4.2        48       116        60
OIR    2025250     91400   20.8400 -110.0000       4.2        50       116        60
OIR    2025250     91400   20.8400 -110.0100       4.2        51       116        60
OIR    2025250     91400   20.8400 -110.0200       4.2        52       116        60
OIR    2025250     91400   20.8400 -110.0300       4.2        53       116        60
OIR    2025250     91400   20.8400 -110.0400       4.2        54       116        60
OIR    2025250     91400   20.8400 -110.0500       4.3        55       116        60
OIR    2025250     91400   20.8400 -110.0600       4.4        55       119        60
OIR    2025250     91400   20.8400 -110.0700       4.5        56       120        60
OIR    2025250     91400   20.8400 -110.0800       4.5        57       122        60
OIR    2025250     91400   20.8400 -110.0900       4.6        60       123        60
OIR    2025250     91400   20.8400 -110.1000       4.8        65       124        60
OIR    2025250     91400   20.8400 -110.1100       5.2        73       127        60
OIR    2025250     91400   20.8400 -110.1200       5.4        75       130        60
OIR    2025250     91400   20.8400 -110.1300       5.8        79       136        60
OIR    2025250     91400   20.8300 -109.0300      13.7        47       136        60
OIR    2025250     91400   20.8300 -109.0400      11.8        43       128        60
OIR    2025250     91400   20.8300 -109.0500      10.9        42       122        60
OIR    2025250     91400   20.8300 -109.0600       9.8        39       119        60
OIR    2025250     91400   20.8300 -109.0700       9.5        40       116        60
OIR    2025250     91400   20.8300 -109.0800       9.4        40       114        60
OIR    2025250     91400   20.8300 -109.0900       9.0        40       113        60
OIR    2025250     91400   20.8300 -109.1000       8.6        43       111        60
OIR    2025250     91400   20.8300 -109.1100       8.4        45       109        60
OIR    2025250     91400   20.8300 -109.1200       8.3        44       108        60
OIR    2025250     91400   20.8300 -109.1300       8.4        42       108        60
OIR    2025250     91400   20.8300 -109.1400       8.6        40       107        60
OIR    2025250     91400   20.8300 -109.1500       8.7        38       107        60
OIR    2025250     91400   20.8300 -109.1600       8.8        37       107        60
OIR    2025250     91400   20.8300 -109.1700       8.8        36       107        60
OIR    2025250     91400   20.8300 -109.1800       8.8        36       107        60
OIR    2025250     91400   20.8300 -109.1900       8.8        36       107        60
OIR    2025250     91400   20.8300 -109.2000       8.8        36       107        60
OIR    2025250     91400   20.8300 -109.2100       8.8        36       105        60
OIR    2025250     91400   20.8300 -109.2200       8.8        36       105        60
OIR    2025250     91400   20.8300 -109.2300       8.8        35       104        60
OIR    2025250     91400   20.8300 -109.2400       8.9        35       103        60
OIR    2025250     91400   20.8300 -109.2500       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.2600       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.2700       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.2800       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.2900       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.3000       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.3100       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.3200       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.3300       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.3400       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.3500       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.3600       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.3700       8.9        35       104        60
OIR    2025250     91400   20.8300 -109.3800       8.9        34       105        60
OIR    2025250     91400   20.8300 -109.3900       8.9        34       105        60
OIR    2025250     91400   20.8300 -109.4000       8.9        34       105        60
OIR    2025250     91400   20.8300 -109.4100       8.9        34       107        60
OIR    2025250     91400   20.8300 -109.4200       8.8        34       107        60
OIR    2025250     91400   20.8300 -109.4300       8.8        34       107        60
OIR    2025250     91400   20.8300 -109.4400       8.8        34       107        60
OIR    2025250     91400   20.8300 -109.4500       8.7        34       107        60
OIR    2025250     91400   20.8300 -109.4600       8.6        34       107        60
OIR    2025250     91400   20.8300 -109.4700       8.6        34       107        60
OIR    2025250     91400   20.8300 -109.4800       8.5        34       107        60
OIR    2025250     91400   20.8300 -109.4900       8.4        34       107        60
OIR    2025250     91400   20.8300 -109.5000       8.4        34       107        60
OIR    2025250     91400   20.8300 -109.5100       8.4        34       105        60
OIR    2025250     91400   20.8300 -109.5200       8.3        33       107        60
OIR    2025250     91400   20.8300 -109.5300       8.3        33       108        60
OIR    2025250     91400   20.8300 -109.5400       8.3        33       109        60
OIR    2025250     91400   20.8300 -109.5500       8.3        33       110        60
OIR    2025250     91400   20.8300 -109.5600       8.3        33       111        60
OIR    2025250     91400   20.8300 -109.5700       8.3        33       111        60
OIR    2025250     91400   20.8300 -109.5800       8.3        33       111        60
OIR    2025250     91400   20.8300 -109.5900       8.3        33       110        60
OIR    2025250     91400   20.8300 -109.6000       8.2        32       110        60
OIR    2025250     91400   20.8300 -109.6100       8.2        32       110        60
OIR    2025250     91400   20.8300 -109.6200       8.2        32       109        60
OIR    2025250     91400   20.8300 -109.6300       8.1        32       109        60
OIR    2025250     91400   20.8300 -109.6400       8.1        32       108        60
OIR    2025250     91400   20.8300 -109.6500       8.0        32       105        60
OIR    2025250     91400   20.8300 -109.6600       7.9        32       104        60
OIR    2025250     91400   20.8300 -109.6700       7.7        32       104        60
OIR    2025250     91400   20.8300 -109.6800       7.5        32       104        60
OIR    2025250     91400   20.8300 -109.6900       7.4        32       103        60
OIR    2025250     91400   20.8300 -109.7000       7.3        32       103        60
OIR    2025250     91400   20.8300 -109.7100       7.3        32       103        60
OIR    2025250     91400   20.8300 -109.7200       7.3        32       103        60
OIR    2025250     91400   20.8300 -109.7300       7.3        32       103        60
OIR    2025250     91400   20.8300 -109.7400       7.2        32       103        60
OIR    2025250     91400   20.8300 -109.7500       7.2        32       103        60
OIR    2025250     91400   20.8300 -109.7600       7.1        32       103        60
OIR    2025250     91400   20.8300 -109.7700       7.1        33       103        60
OIR    2025250     91400   20.8300 -109.7800       7.0        33       103        60
OIR    2025250     91400   20.8300 -109.7900       6.8        33       103        60
OIR    2025250     91400   20.8300 -109.8000       6.5        34       103        60
OIR    2025250     91400   20.8300 -109.8100       6.3        34       103        60
OIR    2025250     91400   20.8300 -109.8200       6.1        35       104        60
OIR    2025250     91400   20.8300 -109.8300       5.9        36       104        60
OIR    2025250     91400   20.8300 -109.8400       5.7        36       104        60
OIR    2025250     91400   20.8300 -109.8500       5.6        36       107        60
OIR    2025250     91400   20.8300 -109.8600       5.4        36       108        60
OIR    2025250     91400   20.8300 -109.8700       5.4        36       110        60
OIR    2025250     91400   20.8300 -109.8800       5.3        37       112        60
OIR    2025250     91400   20.8300 -109.8900       5.2        37       112        60
OIR    2025250     91400   20.8300 -109.9000       5.1        38       112        60
OIR    2025250     91400   20.8300 -109.9100       5.0        38       112        60
OIR    2025250     91400   20.8300 -109.9200       4.9        39       111        60
OIR    2025250     91400   20.8300 -109.9300       4.8        40       111        60
OIR    2025250     91400   20.8300 -109.9400       4.7        41       112        60
OIR    2025250     91400   20.8300 -109.9500       4.6        41       113        60
OIR    2025250     91400   20.8300 -109.9600       4.5        42       115        60
OIR    2025250     91400   20.8300 -109.9700       4.5        44       116        60
OIR    2025250     91400   20.8300 -109.9800       4.4        46       116        60
OIR    2025250     91400   20.8300 -109.9900       4.4        48       117        60
OIR    2025250     91400   20.8300 -110.0000       4.3        50       117        60
OIR    2025250     91400   20.8300 -110.0100       4.3        51       117        60
OIR    2025250     91400   20.8300 -110.0200       4.3        53       117        60
OIR    2025250     91400   20.8300 -110.0300       4.4        54       116        60
OIR    2025250     91400   20.8300 -110.0400       4.5        54       117        60
OIR    2025250     91400   20.8300 -110.0500       4.5        55       119        60
OIR    2025250     91400   20.8300 -110.0600       4.5        54       120        60
OIR    2025250     91400   20.8300 -110.0700       4.6        55       122        60
OIR    2025250     91400   20.8300 -110.0800       4.7        55       123        60
OIR    2025250     91400   20.8300 -110.0900       4.8        57       125        60
OIR    2025250     91400   20.8300 -110.1000       5.0        63       127        60
OIR    2025250     91400   20.8300 -110.1100       5.3        69       130        60
OIR    2025250     91400   20.8300 -110.1200       5.5        69       135        60
OIR    2025250     91400   20.8200 -109.0300      15.5        38       137        60
OIR    2025250     91400   20.8200 -109.0400      13.1        37       130        60
OIR    2025250     91400   20.8200 -109.0500      11.1        39       123        60
OIR    2025250     91400   20.8200 -109.0600      10.8        41       120        60
OIR    2025250     91400   20.8200 -109.0700      10.2        43       116        60
OIR    2025250     91400   20.8200 -109.0800       9.9        44       114        60
OIR    2025250     91400   20.8200 -109.0900       9.0        46       111        60
OIR    2025250     91400   20.8200 -109.1000       8.3        51       109        60
OIR    2025250     91400   20.8200 -109.1100       7.9        53       108        60
OIR    2025250     91400   20.8200 -109.1200       7.7        52       107        60
OIR    2025250     91400   20.8200 -109.1300       7.6        50       107        60
OIR    2025250     91400   20.8200 -109.1400       7.8        46       107        60
OIR    2025250     91400   20.8200 -109.1500       8.4        40       107        60
OIR    2025250     91400   20.8200 -109.1600       8.8        37       107        60
OIR    2025250     91400   20.8200 -109.1700       8.8        36       107        60
OIR    2025250     91400   20.8200 -109.1800       8.8        36       107        60
OIR    2025250     91400   20.8200 -109.1900       8.8        36       107        60
OIR    2025250     91400   20.8200 -109.2000       8.8        36       105        60
OIR    2025250     91400   20.8200 -109.2100       8.8        36       105        60
OIR    2025250     91400   20.8200 -109.2200       8.8        36       104        60
OIR    2025250     91400   20.8200 -109.2300       8.8        35       104        60
OIR    2025250     91400   20.8200 -109.2400       8.8        35       104        60
OIR    2025250     91400   20.8200 -109.2500       8.9        35       104        60
OIR    2025250     91400   20.8200 -109.2600       8.9        35       104        60
OIR    2025250     91400   20.8200 -109.2700       8.9        35       104        60
OIR    2025250     91400   20.8200 -109.2800       8.9        35       104        60
OIR    2025250     91400   20.8200 -109.2900       8.9        35       103        60
OIR    2025250     91400   20.8200 -109.3000       8.9        35       104        60
OIR    2025250     91400   20.8200 -109.3100       8.9        35       104        60
OIR    2025250     91400   20.8200 -109.3200       8.9        35       104        60
OIR    2025250     91400   20.8200 -109.3300       8.9        35       104        60
OIR    2025250     91400   20.8200 -109.3400       8.9        35       103        60
OIR    2025250     91400   20.8200 -109.3500       8.9        35       104        60
OIR    2025250     91400   20.8200 -109.3600       8.9        35       104        60
OIR    2025250     91400   20.8200 -109.3700       8.9        35       104        60
OIR    2025250     91400   20.8200 -109.3800       8.9        34       104        60
OIR    2025250     91400   20.8200 -109.3900       8.9        34       104        60
OIR    2025250     91400   20.8200 -109.4000       8.9        34       104        60
OIR    2025250     91400   20.8200 -109.4100       8.9        34       105        60
OIR    2025250     91400   20.8200 -109.4200       8.8        34       107        60
OIR    2025250     91400   20.8200 -109.4300       8.8        34       107        60
OIR    2025250     91400   20.8200 -109.4400       8.8        34       107        60
OIR    2025250     91400   20.8200 -109.4500       8.8        34       107        60
OIR    2025250     91400   20.8200 -109.4600       8.7        34       108        60
OIR    2025250     91400   20.8200 -109.4700       8.6        34       108        60
OIR    2025250     91400   20.8200 -109.4800       8.6        34       109        60
OIR    2025250     91400   20.8200 -109.4900       8.5        34       109        60
OIR    2025250     91400   20.8200 -109.5000       8.5        33       109        60
OIR    2025250     91400   20.8200 -109.5100       8.4        33       108        60
OIR    2025250     91400   20.8200 -109.5200       8.4        33       108        60
OIR    2025250     91400   20.8200 -109.5300       8.4        33       109        60
OIR    2025250     91400   20.8200 -109.5400       8.4        33       110        60
OIR    2025250     91400   20.8200 -109.5500       8.3        33       110        60
OIR    2025250     91400   20.8200 -109.5600       8.3        33       109        60
OIR    2025250     91400   20.8200 -109.5700       8.3        33       109        60
OIR    2025250     91400   20.8200 -109.5800       8.3        33       109        60
OIR    2025250     91400   20.8200 -109.5900       8.3        32       109        60
OIR    2025250     91400   20.8200 -109.6000       8.3        32       109        60
OIR    2025250     91400   20.8200 -109.6100       8.2        32       110        60
OIR    2025250     91400   20.8200 -109.6200       8.2        32       109        60
OIR    2025250     91400   20.8200 -109.6300       8.1        32       108        60
OIR    2025250     91400   20.8200 -109.6400       8.1        32       107        60
OIR    2025250     91400   20.8200 -109.6500       8.1        32       105        60
OIR    2025250     91400   20.8200 -109.6600       8.0        32       104        60
OIR    2025250     91400   20.8200 -109.6700       7.8        32       104        60
OIR    2025250     91400   20.8200 -109.6800       7.6        32       104        60
OIR    2025250     91400   20.8200 -109.6900       7.5        32       104        60
OIR    2025250     91400   20.8200 -109.7000       7.4        32       103        60
OIR    2025250     91400   20.8200 -109.7100       7.3        32       103        60
OIR    2025250     91400   20.8200 -109.7200       7.3        32       103        60
OIR    2025250     91400   20.8200 -109.7300       7.3        32       103        60
OIR    2025250     91400   20.8200 -109.7400       7.2        32       103        60
OIR    2025250     91400   20.8200 -109.7500       7.2        32       103        60
OIR    2025250     91400   20.8200 -109.7600       7.1        33       103        60
OIR    2025250     91400   20.8200 -109.7700       7.1        33       103        60
OIR    2025250     91400   20.8200 -109.7800       7.0        33       103        60
OIR    2025250     91400   20.8200 -109.7900       6.9        34       103        60
OIR    2025250     91400   20.8200 -109.8000       6.6        34       103        60
OIR    2025250     91400   20.8200 -109.8100       6.4        35       103        60
OIR    2025250     91400   20.8200 -109.8200       6.1        36       104        60
OIR    2025250     91400   20.8200 -109.8300       5.9        37       104        60
OIR    2025250     91400   20.8200 -109.8400       5.7        37       105        60
OIR    2025250     91400   20.8200 -109.8500       5.6        37       107        60
OIR    2025250     91400   20.8200 -109.8600       5.5        37       108        60
OIR    2025250     91400   20.8200 -109.8700       5.4        37       109        60
OIR    2025250     91400   20.8200 -109.8800       5.4        38       111        60
OIR    2025250     91400   20.8200 -109.8900       5.3        38       112        60
OIR    2025250     91400   20.8200 -109.9000       5.2        39       112        60
OIR    2025250     91400   20.8200 -109.9100       5.1        39       112        60
OIR    2025250     91400   20.8200 -109.9200       5.0        40       112        60
OIR    2025250     91400   20.8200 -109.9300       4.9        40       111        60
OIR    2025250     91400   20.8200 -109.9400       4.8        41       111        60
OIR    2025250     91400   20.8200 -109.9500       4.7        42       112        60
OIR    2025250     91400   20.8200 -109.9600       4.6        43       113        60
OIR    2025250     91400   20.8200 -109.9700       4.6        44       115        60
OIR    2025250     91400   20.8200 -109.9800       4.5        46       116        60
OIR    2025250     91400   20.8200 -109.9900       4.5        49       117        60
OIR    2025250     91400   20.8200 -110.0000       4.5        50       117        60
OIR    2025250     91400   20.8200 -110.0100       4.5        52       119        60
OIR    2025250     91400   20.8200 -110.0200       4.6        53       119        60
OIR    2025250     91400   20.8200 -110.0300       4.6        54       119        60
OIR    2025250     91400   20.8200 -110.0400       4.6        54       119        60
OIR    2025250     91400   20.8200 -110.0500       4.6        54       120        60
OIR    2025250     91400   20.8200 -110.0600       4.6        54       121        60
OIR    2025250     91400   20.8200 -110.0700       4.7        54       123        60
OIR    2025250     91400   20.8200 -110.0800       4.7        54       125        60
OIR    2025250     91400   20.8200 -110.0900       4.8        54       127        60
OIR    2025250     91400   20.8200 -110.1000       5.2        61       130        60
OIR    2025250     91400   20.8200 -110.1100       5.5        65       133        60
OIR    2025250     91400   20.8200 -110.1200       5.8        68       140        60
OIR    2025250     91400   20.8200 -111.3100       7.6        30       138        60
OIR    2025250     91400   20.8200 -111.3200       7.5        29       116        60
OIR    2025250     91400   20.8200 -111.3300       7.4        29       116        60
OIR    2025250     91400   20.8200 -111.3400       7.4        29       124        60
OIR    2025250     91400   20.8100 -109.0300      14.8        34       139        60
OIR    2025250     91400   20.8100 -109.0400      12.9        33       134        60
OIR    2025250     91400   20.8100 -109.0500      11.1        39       128        60
OIR    2025250     91400   20.8100 -109.0600      10.8        41       123        60
OIR    2025250     91400   20.8100 -109.0700      10.5        43       116        60
OIR    2025250     91400   20.8100 -109.0800       9.6        51       114        60
OIR    2025250     91400   20.8100 -109.0900       8.4        59       111        60
OIR    2025250     91400   20.8100 -109.1000       7.9        62       109        60
OIR    2025250     91400   20.8100 -109.1100       7.7        57       108        60
OIR    2025250     91400   20.8100 -109.1200       7.6        54       107        60
OIR    2025250     91400   20.8100 -109.1300       7.5        53       107        60
OIR    2025250     91400   20.8100 -109.1400       7.5        51       107        60
OIR    2025250     91400   20.8100 -109.1500       7.9        44       107        60
OIR    2025250     91400   20.8100 -109.1600       8.7        37       107        60
OIR    2025250     91400   20.8100 -109.1700       8.8        36       107        60
OIR    2025250     91400   20.8100 -109.1800       8.8        36       107        60
OIR    2025250     91400   20.8100 -109.1900       8.8        36       107        60
OIR    2025250     91400   20.8100 -109.2000       8.8        36       105        60
OIR    2025250     91400   20.8100 -109.2100       8.8        36       104        60
OIR    2025250     91400   20.8100 -109.2200       8.8        35       104        60
OIR    2025250     91400   20.8100 -109.2300       8.8        35       104        60
OIR    2025250     91400   20.8100 -109.2400       8.8        35       104        60
OIR    2025250     91400   20.8100 -109.2500       8.8        35       104        60
OIR    2025250     91400   20.8100 -109.2600       8.9        35       104        60
OIR    2025250     91400   20.8100 -109.2700       8.9        35       103        60
OIR    2025250     91400   20.8100 -109.2800       8.9        35       103        60
OIR    2025250     91400   20.8100 -109.2900       8.9        35       103        60
OIR    2025250     91400   20.8100 -109.3000       8.9        35       103        60
OIR    2025250     91400   20.8100 -109.3100       8.9        35       104        60
OIR    2025250     91400   20.8100 -109.3200       8.9        35       104        60
OIR    2025250     91400   20.8100 -109.3300       8.9        35       104        60
OIR    2025250     91400   20.8100 -109.3400       8.9        35       103        60
OIR    2025250     91400   20.8100 -109.3500       8.9        35       103        60
OIR    2025250     91400   20.8100 -109.3600       8.9        35       104        60
OIR    2025250     91400   20.8100 -109.3700       8.9        34       104        60
OIR    2025250     91400   20.8100 -109.3800       8.9        34       104        60
OIR    2025250     91400   20.8100 -109.3900       8.9        34       104        60
OIR    2025250     91400   20.8100 -109.4000       8.9        34       104        60
OIR    2025250     91400   20.8100 -109.4100       8.9        34       104        60
OIR    2025250     91400   20.8100 -109.4200       8.9        34       105        60
OIR    2025250     91400   20.8100 -109.4300       8.8        34       105        60
OIR    2025250     91400   20.8100 -109.4400       8.8        34       107        60
OIR    2025250     91400   20.8100 -109.4500       8.8        34       107        60
OIR    2025250     91400   20.8100 -109.4600       8.8        34       108        60
OIR    2025250     91400   20.8100 -109.4700       8.7        34       109        60
OIR    2025250     91400   20.8100 -109.4800       8.6        34       108        60
OIR    2025250     91400   20.8100 -109.4900       8.6        33       108        60
OIR    2025250     91400   20.8100 -109.5000       8.5        33       108        60
OIR    2025250     91400   20.8100 -109.5100       8.5        33       108        60
OIR    2025250     91400   20.8100 -109.5200       8.4        33       108        60
OIR    2025250     91400   20.8100 -109.5300       8.4        33       108        60
OIR    2025250     91400   20.8100 -109.5400       8.4        33       108        60
OIR    2025250     91400   20.8100 -109.5500       8.4        33       108        60
OIR    2025250     91400   20.8100 -109.5600       8.3        33       108        60
OIR    2025250     91400   20.8100 -109.5700       8.3        33       108        60
OIR    2025250     91400   20.8100 -109.5800       8.3        32       108        60
OIR    2025250     91400   20.8100 -109.5900       8.3        32       108        60
OIR    2025250     91400   20.8100 -109.6000       8.3        32       108        60
OIR    2025250     91400   20.8100 -109.6100       8.2        32       109        60
OIR    2025250     91400   20.8100 -109.6200       8.2        32       109        60
OIR    2025250     91400   20.8100 -109.6300       8.2        32       108        60
OIR    2025250     91400   20.8100 -109.6400       8.1        32       105        60
OIR    2025250     91400   20.8100 -109.6500       8.1        32       104        60
OIR    2025250     91400   20.8100 -109.6600       8.0        32       104        60
OIR    2025250     91400   20.8100 -109.6700       7.9        32       104        60
OIR    2025250     91400   20.8100 -109.6800       7.8        32       104        60
OIR    2025250     91400   20.8100 -109.6900       7.6        32       104        60
OIR    2025250     91400   20.8100 -109.7000       7.4        32       104        60
OIR    2025250     91400   20.8100 -109.7100       7.4        32       103        60
OIR    2025250     91400   20.8100 -109.7200       7.3        32       103        60
OIR    2025250     91400   20.8100 -109.7300       7.3        32       103        60
OIR    2025250     91400   20.8100 -109.7400       7.3        32       103        60
OIR    2025250     91400   20.8100 -109.7500       7.2        33       103        60
OIR    2025250     91400   20.8100 -109.7600       7.2        33       103        60
OIR    2025250     91400   20.8100 -109.7700       7.1        33       103        60
OIR    2025250     91400   20.8100 -109.7800       7.0        33       103        60
OIR    2025250     91400   20.8100 -109.7900       6.9        34       103        60
OIR    2025250     91400   20.8100 -109.8000       6.6        35       103        60
OIR    2025250     91400   20.8100 -109.8100       6.4        36       103        60
OIR    2025250     91400   20.8100 -109.8200       6.2        37       103        60
OIR    2025250     91400   20.8100 -109.8300       6.0        37       104        60
OIR    2025250     91400   20.8100 -109.8400       5.8        37       105        60
OIR    2025250     91400   20.8100 -109.8500       5.7        38       107        60
OIR    2025250     91400   20.8100 -109.8600       5.6        38       108        60
OIR    2025250     91400   20.8100 -109.8700       5.5        38       110        60
OIR    2025250     91400   20.8100 -109.8800       5.4        38       111        60
OIR    2025250     91400   20.8100 -109.8900       5.4        39       112        60
OIR    2025250     91400   20.8100 -109.9000       5.3        39       113        60
OIR    2025250     91400   20.8100 -109.9100       5.2        39       113        60
OIR    2025250     91400   20.8100 -109.9200       5.1        40       113        60
OIR    2025250     91400   20.8100 -109.9300       5.0        41       113        60
OIR    2025250     91400   20.8100 -109.9400       4.9        42       113        60
OIR    2025250     91400   20.8100 -109.9500       4.8        43       113        60
OIR    2025250     91400   20.8100 -109.9600       4.7        44       113        60
OIR    2025250     91400   20.8100 -109.9700       4.7        45       114        60
OIR    2025250     91400   20.8100 -109.9800       4.6        47       116        60
OIR    2025250     91400   20.8100 -109.9900       4.6        49       116        60
OIR    2025250     91400   20.8100 -110.0000       4.6        51       116        60
OIR    2025250     91400   20.8100 -110.0100       4.7        53       117        60
OIR    2025250     91400   20.8100 -110.0200       4.7        53       119        60
OIR    2025250     91400   20.8100 -110.0300       4.7        54       121        60
OIR    2025250     91400   20.8100 -110.0400       4.6        53       122        60
OIR    2025250     91400   20.8100 -110.0500       4.7        53       124        60
OIR    2025250     91400   20.8100 -110.0600       4.7        53       126        60
OIR    2025250     91400   20.8100 -110.0700       4.7        53       129        60
OIR    2025250     91400   20.8100 -110.0800       4.8        53       131        60
OIR    2025250     91400   20.8100 -110.0900       4.9        54       134        60
OIR    2025250     91400   20.8100 -110.1000       5.4        60       137        60
OIR    2025250     91400   20.8100 -110.1100       5.7        63       140        60
OIR    2025250     91400   20.8100 -111.3500       7.2        29       153        60
OIR    2025250     91400   20.8000 -109.0400      10.4        40       138        60
OIR    2025250     91400   20.8000 -109.0500      10.3        43       134        60
OIR    2025250     91400   20.8000 -109.0600       9.9        43       128        60
OIR    2025250     91400   20.8000 -109.0700       9.4        49       121        60
OIR    2025250     91400   20.8000 -109.0800       8.6        64       116        60
OIR    2025250     91400   20.8000 -109.0900       7.8        76       113        60
OIR    2025250     91400   20.8000 -109.1000       7.6        77       110        60
OIR    2025250     91400   20.8000 -109.1100       7.5        67       109        60
OIR    2025250     91400   20.8000 -109.1200       7.6        57       108        60
OIR    2025250     91400   20.8000 -109.1300       7.7        54       108        60
OIR    2025250     91400   20.8000 -109.1400       7.9        52       108        60
OIR    2025250     91400   20.8000 -109.1500       8.2        48       108        60
OIR    2025250     91400   20.8000 -109.1600       8.7        39       107        60
OIR    2025250     91400   20.8000 -109.1700       8.8        37       107        60
OIR    2025250     91400   20.8000 -109.1800       8.8        36       105        60
OIR    2025250     91400   20.8000 -109.1900       8.8        36       105        60
OIR    2025250     91400   20.8000 -109.2000       8.8        36       105        60
OIR    2025250     91400   20.8000 -109.2100       8.8        36       104        60
OIR    2025250     91400   20.8000 -109.2200       8.8        35       104        60
OIR    2025250     91400   20.8000 -109.2300       8.8        35       104        60
OIR    2025250     91400   20.8000 -109.2400       8.8        35       104        60
OIR    2025250     91400   20.8000 -109.2500       8.8        35       104        60
OIR    2025250     91400   20.8000 -109.2600       8.8        35       104        60
OIR    2025250     91400   20.8000 -109.2700       8.9        35       103        60
OIR    2025250     91400   20.8000 -109.2800       8.9        35       103        60
OIR    2025250     91400   20.8000 -109.2900       8.9        35       103        60
OIR    2025250     91400   20.8000 -109.3000       8.9        35       103        60
OIR    2025250     91400   20.8000 -109.3100       8.9        35       103        60
OIR    2025250     91400   20.8000 -109.3200       8.9        35       104        60
OIR    2025250     91400   20.8000 -109.3300       8.9        35       104        60
OIR    2025250     91400   20.8000 -109.3400       8.9        35       103        60
OIR    2025250     91400   20.8000 -109.3500       8.9        35       103        60
OIR    2025250     91400   20.8000 -109.3600       8.9        35       103        60
OIR    2025250     91400   20.8000 -109.3700       8.9        34       104        60
OIR    2025250     91400   20.8000 -109.3800       8.9        34       104        60
OIR    2025250     91400   20.8000 -109.3900       8.9        34       103        60
OIR    2025250     91400   20.8000 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.8000 -109.4100       8.9        34       104        60
OIR    2025250     91400   20.8000 -109.4200       8.9        34       104        60
OIR    2025250     91400   20.8000 -109.4300       8.9        34       104        60
OIR    2025250     91400   20.8000 -109.4400       8.8        34       105        60
OIR    2025250     91400   20.8000 -109.4500       8.8        34       107        60
OIR    2025250     91400   20.8000 -109.4600       8.8        34       108        60
OIR    2025250     91400   20.8000 -109.4700       8.7        34       109        60
OIR    2025250     91400   20.8000 -109.4800       8.7        33       108        60
OIR    2025250     91400   20.8000 -109.4900       8.6        33       107        60
OIR    2025250     91400   20.8000 -109.5000       8.6        33       105        60
OIR    2025250     91400   20.8000 -109.5100       8.5        33       107        60
OIR    2025250     91400   20.8000 -109.5200       8.5        33       108        60
OIR    2025250     91400   20.8000 -109.5300       8.4        33       107        60
OIR    2025250     91400   20.8000 -109.5400       8.4        33       105        60
OIR    2025250     91400   20.8000 -109.5500       8.4        33       104        60
OIR    2025250     91400   20.8000 -109.5600       8.4        33       105        60
OIR    2025250     91400   20.8000 -109.5700       8.3        33       107        60
OIR    2025250     91400   20.8000 -109.5800       8.3        32       107        60
OIR    2025250     91400   20.8000 -109.5900       8.3        32       107        60
OIR    2025250     91400   20.8000 -109.6000       8.3        32       107        60
OIR    2025250     91400   20.8000 -109.6100       8.2        32       108        60
OIR    2025250     91400   20.8000 -109.6200       8.2        32       109        60
OIR    2025250     91400   20.8000 -109.6300       8.2        32       107        60
OIR    2025250     91400   20.8000 -109.6400       8.1        32       104        60
OIR    2025250     91400   20.8000 -109.6500       8.1        32       104        60
OIR    2025250     91400   20.8000 -109.6600       8.1        32       104        60
OIR    2025250     91400   20.8000 -109.6700       8.0        32       104        60
OIR    2025250     91400   20.8000 -109.6800       7.8        32       103        60
OIR    2025250     91400   20.8000 -109.6900       7.7        32       103        60
OIR    2025250     91400   20.8000 -109.7000       7.5        32       103        60
OIR    2025250     91400   20.8000 -109.7100       7.4        32       103        60
OIR    2025250     91400   20.8000 -109.7200       7.4        32       103        60
OIR    2025250     91400   20.8000 -109.7300       7.3        32       103        60
OIR    2025250     91400   20.8000 -109.7400       7.3        33       103        60
OIR    2025250     91400   20.8000 -109.7500       7.3        33       103        60
OIR    2025250     91400   20.8000 -109.7600       7.2        33       103        60
OIR    2025250     91400   20.8000 -109.7700       7.1        33       103        60
OIR    2025250     91400   20.8000 -109.7800       7.1        34       103        60
OIR    2025250     91400   20.8000 -109.7900       6.9        34       103        60
OIR    2025250     91400   20.8000 -109.8000       6.7        35       103        60
OIR    2025250     91400   20.8000 -109.8100       6.5        36       103        60
OIR    2025250     91400   20.8000 -109.8200       6.2        37       103        60
OIR    2025250     91400   20.8000 -109.8300       6.0        37       104        60
OIR    2025250     91400   20.8000 -109.8400       5.8        38       105        60
OIR    2025250     91400   20.8000 -109.8500       5.7        38       107        60
OIR    2025250     91400   20.8000 -109.8600       5.6        38       108        60
OIR    2025250     91400   20.8000 -109.8700       5.5        38       110        60
OIR    2025250     91400   20.8000 -109.8800       5.5        39       111        60
OIR    2025250     91400   20.8000 -109.8900       5.4        39       113        60
OIR    2025250     91400   20.8000 -109.9000       5.4        39       113        60
OIR    2025250     91400   20.8000 -109.9100       5.3        40       113        60
OIR    2025250     91400   20.8000 -109.9200       5.2        40       113        60
OIR    2025250     91400   20.8000 -109.9300       5.1        41       114        60
OIR    2025250     91400   20.8000 -109.9400       5.0        42       114        60
OIR    2025250     91400   20.8000 -109.9500       4.9        43       114        60
OIR    2025250     91400   20.8000 -109.9600       4.8        45       114        60
OIR    2025250     91400   20.8000 -109.9700       4.8        46       114        60
OIR    2025250     91400   20.8000 -109.9800       4.7        48       115        60
OIR    2025250     91400   20.8000 -109.9900       4.7        50       116        60
OIR    2025250     91400   20.8000 -110.0000       4.7        52       116        60
OIR    2025250     91400   20.8000 -110.0100       4.7        53       116        60
OIR    2025250     91400   20.8000 -110.0200       4.7        54       117        60
OIR    2025250     91400   20.8000 -110.0300       4.7        53       121        60
OIR    2025250     91400   20.8000 -110.0400       4.7        53       124        60
OIR    2025250     91400   20.8000 -110.0500       4.7        53       128        60
OIR    2025250     91400   20.8000 -110.0600       4.7        53       131        60
OIR    2025250     91400   20.8000 -110.0700       4.7        53       134        60
OIR    2025250     91400   20.8000 -110.0800       4.8        53       137        60
OIR    2025250     91400   20.8000 -110.0900       5.0        52       140        60
OIR    2025250     91400   20.7900 -109.0500       8.5        43       139        60
OIR    2025250     91400   20.7900 -109.0600       8.5        46       134        60
OIR    2025250     91400   20.7900 -109.0700       7.8        53       127        60
OIR    2025250     91400   20.7900 -109.0800       7.1        70       121        60
OIR    2025250     91400   20.7900 -109.0900       7.6        83       116        60
OIR    2025250     91400   20.7900 -109.1000       7.6        81       114        60
OIR    2025250     91400   20.7900 -109.1100       7.3        77       111        60
OIR    2025250     91400   20.7900 -109.1200       7.4        69       110        60
OIR    2025250     91400   20.7900 -109.1300       7.6        60       109        60
OIR    2025250     91400   20.7900 -109.1400       7.9        54       109        60
OIR    2025250     91400   20.7900 -109.1500       8.0        50       109        60
OIR    2025250     91400   20.7900 -109.1600       8.5        41       108        60
OIR    2025250     91400   20.7900 -109.1700       8.7        39       107        60
OIR    2025250     91400   20.7900 -109.1800       8.7        37       105        60
OIR    2025250     91400   20.7900 -109.1900       8.7        36       104        60
OIR    2025250     91400   20.7900 -109.2000       8.8        36       104        60
OIR    2025250     91400   20.7900 -109.2100       8.8        36       104        60
OIR    2025250     91400   20.7900 -109.2200       8.8        35       104        60
OIR    2025250     91400   20.7900 -109.2300       8.8        35       103        60
OIR    2025250     91400   20.7900 -109.2400       8.8        35       104        60
OIR    2025250     91400   20.7900 -109.2500       8.8        35       104        60
OIR    2025250     91400   20.7900 -109.2600       8.8        35       104        60
OIR    2025250     91400   20.7900 -109.2700       8.9        35       103        60
OIR    2025250     91400   20.7900 -109.2800       8.9        35       103        60
OIR    2025250     91400   20.7900 -109.2900       8.9        35       103        60
OIR    2025250     91400   20.7900 -109.3000       8.9        35       103        60
OIR    2025250     91400   20.7900 -109.3100       8.9        35       103        60
OIR    2025250     91400   20.7900 -109.3200       8.9        35       103        60
OIR    2025250     91400   20.7900 -109.3300       8.9        35       103        60
OIR    2025250     91400   20.7900 -109.3400       8.9        35       103        60
OIR    2025250     91400   20.7900 -109.3500       8.9        35       103        60
OIR    2025250     91400   20.7900 -109.3600       8.9        35       103        60
OIR    2025250     91400   20.7900 -109.3700       8.9        34       103        60
OIR    2025250     91400   20.7900 -109.3800       8.9        34       103        60
OIR    2025250     91400   20.7900 -109.3900       8.9        34       103        60
OIR    2025250     91400   20.7900 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.7900 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.7900 -109.4200       8.9        34       104        60
OIR    2025250     91400   20.7900 -109.4300       8.9        34       104        60
OIR    2025250     91400   20.7900 -109.4400       8.8        34       104        60
OIR    2025250     91400   20.7900 -109.4500       8.8        34       104        60
OIR    2025250     91400   20.7900 -109.4600       8.8        34       104        60
OIR    2025250     91400   20.7900 -109.4700       8.8        34       105        60
OIR    2025250     91400   20.7900 -109.4800       8.7        33       105        60
OIR    2025250     91400   20.7900 -109.4900       8.7        33       104        60
OIR    2025250     91400   20.7900 -109.5000       8.6        33       104        60
OIR    2025250     91400   20.7900 -109.5100       8.6        33       104        60
OIR    2025250     91400   20.7900 -109.5200       8.5        33       105        60
OIR    2025250     91400   20.7900 -109.5300       8.5        33       104        60
OIR    2025250     91400   20.7900 -109.5400       8.4        33       104        60
OIR    2025250     91400   20.7900 -109.5500       8.4        33       104        60
OIR    2025250     91400   20.7900 -109.5600       8.4        32       104        60
OIR    2025250     91400   20.7900 -109.5700       8.4        32       104        60
OIR    2025250     91400   20.7900 -109.5800       8.3        32       104        60
OIR    2025250     91400   20.7900 -109.5900       8.3        32       104        60
OIR    2025250     91400   20.7900 -109.6000       8.3        32       105        60
OIR    2025250     91400   20.7900 -109.6100       8.2        32       105        60
OIR    2025250     91400   20.7900 -109.6200       8.2        32       107        60
OIR    2025250     91400   20.7900 -109.6300       8.2        32       105        60
OIR    2025250     91400   20.7900 -109.6400       8.1        32       104        60
OIR    2025250     91400   20.7900 -109.6500       8.1        32       103        60
OIR    2025250     91400   20.7900 -109.6600       8.1        32       103        60
OIR    2025250     91400   20.7900 -109.6700       8.0        32       103        60
OIR    2025250     91400   20.7900 -109.6800       7.9        32       103        60
OIR    2025250     91400   20.7900 -109.6900       7.7        32       103        60
OIR    2025250     91400   20.7900 -109.7000       7.6        32       103        60
OIR    2025250     91400   20.7900 -109.7100       7.5        32       103        60
OIR    2025250     91400   20.7900 -109.7200       7.4        32       103        60
OIR    2025250     91400   20.7900 -109.7300       7.4        33       103        60
OIR    2025250     91400   20.7900 -109.7400       7.3        33       103        60
OIR    2025250     91400   20.7900 -109.7500       7.3        33       103        60
OIR    2025250     91400   20.7900 -109.7600       7.3        33       103        60
OIR    2025250     91400   20.7900 -109.7700       7.2        33       103        60
OIR    2025250     91400   20.7900 -109.7800       7.1        34       103        60
OIR    2025250     91400   20.7900 -109.7900       7.0        34       103        60
OIR    2025250     91400   20.7900 -109.8000       6.7        35       103        60
OIR    2025250     91400   20.7900 -109.8100       6.5        36       103        60
OIR    2025250     91400   20.7900 -109.8200       6.3        37       103        60
OIR    2025250     91400   20.7900 -109.8300       6.0        37       104        60
OIR    2025250     91400   20.7900 -109.8400       5.8        38       104        60
OIR    2025250     91400   20.7900 -109.8500       5.7        38       107        60
OIR    2025250     91400   20.7900 -109.8600       5.6        39       109        60
OIR    2025250     91400   20.7900 -109.8700       5.6        39       110        60
OIR    2025250     91400   20.7900 -109.8800       5.5        39       112        60
OIR    2025250     91400   20.7900 -109.8900       5.4        39       113        60
OIR    2025250     91400   20.7900 -109.9000       5.4        39       114        60
OIR    2025250     91400   20.7900 -109.9100       5.3        40       114        60
OIR    2025250     91400   20.7900 -109.9200       5.2        40       114        60
OIR    2025250     91400   20.7900 -109.9300       5.1        42       113        60
OIR    2025250     91400   20.7900 -109.9400       5.0        43       113        60
OIR    2025250     91400   20.7900 -109.9500       5.0        45       113        60
OIR    2025250     91400   20.7900 -109.9600       4.9        46       114        60
OIR    2025250     91400   20.7900 -109.9700       4.9        47       114        60
OIR    2025250     91400   20.7900 -109.9800       4.8        49       115        60
OIR    2025250     91400   20.7900 -109.9900       4.8        51       116        60
OIR    2025250     91400   20.7900 -110.0000       4.8        53       116        60
OIR    2025250     91400   20.7900 -110.0100       4.8        53       117        60
OIR    2025250     91400   20.7900 -110.0200       4.7        53       119        60
OIR    2025250     91400   20.7900 -110.0300       4.7        53       123        60
OIR    2025250     91400   20.7900 -110.0400       4.7        53       127        60
OIR    2025250     91400   20.7900 -110.0500       4.7        53       131        60
OIR    2025250     91400   20.7900 -110.0600       4.7        53       135        60
OIR    2025250     91400   20.7900 -110.0700       4.8        51       139        60
OIR    2025250     91400   20.7800 -109.0600       7.9        46       140        60
OIR    2025250     91400   20.7800 -109.0700       5.4        61       134        60
OIR    2025250     91400   20.7800 -109.0800       5.9        87       127        60
OIR    2025250     91400   20.7800 -109.0900       7.6        96       124        60
OIR    2025250     91400   20.7800 -109.1000       7.8        94       120        60
OIR    2025250     91400   20.7800 -109.1100       7.5        87       117        60
OIR    2025250     91400   20.7800 -109.1200       7.6        82       116        60
OIR    2025250     91400   20.7800 -109.1300       7.6        74       115        60
OIR    2025250     91400   20.7800 -109.1400       7.7        57       114        60
OIR    2025250     91400   20.7800 -109.1500       7.7        47       112        60
OIR    2025250     91400   20.7800 -109.1600       8.3        43       111        60
OIR    2025250     91400   20.7800 -109.1700       8.5        41       109        60
OIR    2025250     91400   20.7800 -109.1800       8.6        37       107        60
OIR    2025250     91400   20.7800 -109.1900       8.7        36       105        60
OIR    2025250     91400   20.7800 -109.2000       8.7        36       104        60
OIR    2025250     91400   20.7800 -109.2100       8.7        35       104        60
OIR    2025250     91400   20.7800 -109.2200       8.8        35       104        60
OIR    2025250     91400   20.7800 -109.2300       8.8        35       104        60
OIR    2025250     91400   20.7800 -109.2400       8.8        35       104        60
OIR    2025250     91400   20.7800 -109.2500       8.8        35       104        60
OIR    2025250     91400   20.7800 -109.2600       8.8        35       104        60
OIR    2025250     91400   20.7800 -109.2700       8.9        35       104        60
OIR    2025250     91400   20.7800 -109.2800       8.9        35       104        60
OIR    2025250     91400   20.7800 -109.2900       8.9        35       103        60
OIR    2025250     91400   20.7800 -109.3000       8.9        35       103        60
OIR    2025250     91400   20.7800 -109.3100       8.9        35       103        60
OIR    2025250     91400   20.7800 -109.3200       8.9        35       103        60
OIR    2025250     91400   20.7800 -109.3300       8.9        35       103        60
OIR    2025250     91400   20.7800 -109.3400       8.9        35       103        60
OIR    2025250     91400   20.7800 -109.3500       8.9        35       103        60
OIR    2025250     91400   20.7800 -109.3600       8.9        34       103        60
OIR    2025250     91400   20.7800 -109.3700       8.9        34       103        60
OIR    2025250     91400   20.7800 -109.3800       8.9        34       103        60
OIR    2025250     91400   20.7800 -109.3900       8.9        34       103        60
OIR    2025250     91400   20.7800 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.7800 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.7800 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.7800 -109.4300       8.9        34       103        60
OIR    2025250     91400   20.7800 -109.4400       8.8        34       103        60
OIR    2025250     91400   20.7800 -109.4500       8.8        34       103        60
OIR    2025250     91400   20.7800 -109.4600       8.8        34       103        60
OIR    2025250     91400   20.7800 -109.4700       8.8        34       103        60
OIR    2025250     91400   20.7800 -109.4800       8.7        33       103        60
OIR    2025250     91400   20.7800 -109.4900       8.7        33       103        60
OIR    2025250     91400   20.7800 -109.5000       8.6        33       103        60
OIR    2025250     91400   20.7800 -109.5100       8.6        33       103        60
OIR    2025250     91400   20.7800 -109.5200       8.5        33       103        60
OIR    2025250     91400   20.7800 -109.5300       8.5        33       103        60
OIR    2025250     91400   20.7800 -109.5400       8.4        33       103        60
OIR    2025250     91400   20.7800 -109.5500       8.4        32       103        60
OIR    2025250     91400   20.7800 -109.5600       8.4        32       103        60
OIR    2025250     91400   20.7800 -109.5700       8.4        32       104        60
OIR    2025250     91400   20.7800 -109.5800       8.3        32       104        60
OIR    2025250     91400   20.7800 -109.5900       8.3        32       104        60
OIR    2025250     91400   20.7800 -109.6000       8.3        32       104        60
OIR    2025250     91400   20.7800 -109.6100       8.3        32       104        60
OIR    2025250     91400   20.7800 -109.6200       8.2        32       104        60
OIR    2025250     91400   20.7800 -109.6300       8.2        32       104        60
OIR    2025250     91400   20.7800 -109.6400       8.1        32       104        60
OIR    2025250     91400   20.7800 -109.6500       8.1        32       103        60
OIR    2025250     91400   20.7800 -109.6600       8.1        32       103        60
OIR    2025250     91400   20.7800 -109.6700       8.0        32       103        60
OIR    2025250     91400   20.7800 -109.6800       7.9        32       103        60
OIR    2025250     91400   20.7800 -109.6900       7.8        32       103        60
OIR    2025250     91400   20.7800 -109.7000       7.7        32       103        60
OIR    2025250     91400   20.7800 -109.7100       7.5        32       103        60
OIR    2025250     91400   20.7800 -109.7200       7.4        33       103        60
OIR    2025250     91400   20.7800 -109.7300       7.4        33       103        60
OIR    2025250     91400   20.7800 -109.7400       7.4        33       103        60
OIR    2025250     91400   20.7800 -109.7500       7.3        33       103        60
OIR    2025250     91400   20.7800 -109.7600       7.3        33       103        60
OIR    2025250     91400   20.7800 -109.7700       7.2        33       103        60
OIR    2025250     91400   20.7800 -109.7800       7.2        34       103        60
OIR    2025250     91400   20.7800 -109.7900       7.0        34       103        60
OIR    2025250     91400   20.7800 -109.8000       6.8        35       103        60
OIR    2025250     91400   20.7800 -109.8100       6.6        36       103        60
OIR    2025250     91400   20.7800 -109.8200       6.3        37       103        60
OIR    2025250     91400   20.7800 -109.8300       6.1        38       104        60
OIR    2025250     91400   20.7800 -109.8400       5.9        38       104        60
OIR    2025250     91400   20.7800 -109.8500       5.7        39       107        60
OIR    2025250     91400   20.7800 -109.8600       5.6        39       109        60
OIR    2025250     91400   20.7800 -109.8700       5.6        39       110        60
OIR    2025250     91400   20.7800 -109.8800       5.5        39       112        60
OIR    2025250     91400   20.7800 -109.8900       5.5        39       113        60
OIR    2025250     91400   20.7800 -109.9000       5.4        39       114        60
OIR    2025250     91400   20.7800 -109.9100       5.4        40       114        60
OIR    2025250     91400   20.7800 -109.9200       5.3        40       114        60
OIR    2025250     91400   20.7800 -109.9300       5.2        42       113        60
OIR    2025250     91400   20.7800 -109.9400       5.1        44       112        60
OIR    2025250     91400   20.7800 -109.9500       5.0        46       112        60
OIR    2025250     91400   20.7800 -109.9600       5.0        47       113        60
OIR    2025250     91400   20.7800 -109.9700       4.9        48       114        60
OIR    2025250     91400   20.7800 -109.9800       4.9        50       115        60
OIR    2025250     91400   20.7800 -109.9900       4.9        52       116        60
OIR    2025250     91400   20.7800 -110.0000       4.8        53       116        60
OIR    2025250     91400   20.7800 -110.0100       4.8        53       119        60
OIR    2025250     91400   20.7800 -110.0200       4.8        53       120        60
OIR    2025250     91400   20.7800 -110.0300       4.7        53       125        60
OIR    2025250     91400   20.7800 -110.0400       4.7        53       129        60
OIR    2025250     91400   20.7800 -110.0500       4.7        53       134        60
OIR    2025250     91400   20.7800 -110.0600       4.7        51       139        60
OIR    2025250     91400   20.7700 -109.0800       7.2       128       136        60
OIR    2025250     91400   20.7700 -109.0900       8.9       105       132        60
OIR    2025250     91400   20.7700 -109.1000       8.8        98       129        60
OIR    2025250     91400   20.7700 -109.1100       7.8        86       125        60
OIR    2025250     91400   20.7700 -109.1200       8.0        81       123        60
OIR    2025250     91400   20.7700 -109.1300       8.0        80       122        60
OIR    2025250     91400   20.7700 -109.1400       7.7        62       119        60
OIR    2025250     91400   20.7700 -109.1500       8.1        47       116        60
OIR    2025250     91400   20.7700 -109.1600       8.2        44       114        60
OIR    2025250     91400   20.7700 -109.1700       8.3        43       111        60
OIR    2025250     91400   20.7700 -109.1800       8.4        39       109        60
OIR    2025250     91400   20.7700 -109.1900       8.6        37       107        60
OIR    2025250     91400   20.7700 -109.2000       8.6        36       105        60
OIR    2025250     91400   20.7700 -109.2100       8.7        35       104        60
OIR    2025250     91400   20.7700 -109.2200       8.7        35       105        60
OIR    2025250     91400   20.7700 -109.2300       8.8        35       105        60
OIR    2025250     91400   20.7700 -109.2400       8.8        35       105        60
OIR    2025250     91400   20.7700 -109.2500       8.8        35       104        60
OIR    2025250     91400   20.7700 -109.2600       8.8        35       104        60
OIR    2025250     91400   20.7700 -109.2700       8.8        35       104        60
OIR    2025250     91400   20.7700 -109.2800       8.9        35       104        60
OIR    2025250     91400   20.7700 -109.2900       8.9        35       104        60
OIR    2025250     91400   20.7700 -109.3000       8.9        35       103        60
OIR    2025250     91400   20.7700 -109.3100       8.9        35       103        60
OIR    2025250     91400   20.7700 -109.3200       8.9        35       103        60
OIR    2025250     91400   20.7700 -109.3300       8.9        35       103        60
OIR    2025250     91400   20.7700 -109.3400       8.9        35       103        60
OIR    2025250     91400   20.7700 -109.3500       8.9        35       103        60
OIR    2025250     91400   20.7700 -109.3600       8.9        34       103        60
OIR    2025250     91400   20.7700 -109.3700       8.9        34       103        60
OIR    2025250     91400   20.7700 -109.3800       8.9        34       103        60
OIR    2025250     91400   20.7700 -109.3900       8.9        34       103        60
OIR    2025250     91400   20.7700 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.7700 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.7700 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.7700 -109.4300       8.9        34       103        60
OIR    2025250     91400   20.7700 -109.4400       8.8        34       103        60
OIR    2025250     91400   20.7700 -109.4500       8.8        34       103        60
OIR    2025250     91400   20.7700 -109.4600       8.8        34       103        60
OIR    2025250     91400   20.7700 -109.4700       8.8        34       103        60
OIR    2025250     91400   20.7700 -109.4800       8.7        33       103        60
OIR    2025250     91400   20.7700 -109.4900       8.7        33       103        60
OIR    2025250     91400   20.7700 -109.5000       8.6        33       103        60
OIR    2025250     91400   20.7700 -109.5100       8.6        33       103        60
OIR    2025250     91400   20.7700 -109.5200       8.5        33       103        60
OIR    2025250     91400   20.7700 -109.5300       8.5        33       103        60
OIR    2025250     91400   20.7700 -109.5400       8.5        32       103        60
OIR    2025250     91400   20.7700 -109.5500       8.4        32       103        60
OIR    2025250     91400   20.7700 -109.5600       8.4        32       103        60
OIR    2025250     91400   20.7700 -109.5700       8.4        32       103        60
OIR    2025250     91400   20.7700 -109.5800       8.3        32       103        60
OIR    2025250     91400   20.7700 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.7700 -109.6000       8.3        32       103        60
OIR    2025250     91400   20.7700 -109.6100       8.3        32       103        60
OIR    2025250     91400   20.7700 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.7700 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.7700 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.7700 -109.6500       8.1        32       103        60
OIR    2025250     91400   20.7700 -109.6600       8.1        32       103        60
OIR    2025250     91400   20.7700 -109.6700       8.0        32       103        60
OIR    2025250     91400   20.7700 -109.6800       7.9        32       103        60
OIR    2025250     91400   20.7700 -109.6900       7.9        32       103        60
OIR    2025250     91400   20.7700 -109.7000       7.8        32       103        60
OIR    2025250     91400   20.7700 -109.7100       7.6        32       103        60
OIR    2025250     91400   20.7700 -109.7200       7.5        33       103        60
OIR    2025250     91400   20.7700 -109.7300       7.4        33       103        60
OIR    2025250     91400   20.7700 -109.7400       7.4        33       103        60
OIR    2025250     91400   20.7700 -109.7500       7.3        33       103        60
OIR    2025250     91400   20.7700 -109.7600       7.3        33       103        60
OIR    2025250     91400   20.7700 -109.7700       7.3        33       103        60
OIR    2025250     91400   20.7700 -109.7800       7.2        34       103        60
OIR    2025250     91400   20.7700 -109.7900       7.1        34       103        60
OIR    2025250     91400   20.7700 -109.8000       6.9        35       103        60
OIR    2025250     91400   20.7700 -109.8100       6.6        36       103        60
OIR    2025250     91400   20.7700 -109.8200       6.4        37       103        60
OIR    2025250     91400   20.7700 -109.8300       6.1        38       104        60
OIR    2025250     91400   20.7700 -109.8400       5.9        38       104        60
OIR    2025250     91400   20.7700 -109.8500       5.7        39       107        60
OIR    2025250     91400   20.7700 -109.8600       5.6        39       108        60
OIR    2025250     91400   20.7700 -109.8700       5.6        39       110        60
OIR    2025250     91400   20.7700 -109.8800       5.5        39       112        60
OIR    2025250     91400   20.7700 -109.8900       5.5        39       112        60
OIR    2025250     91400   20.7700 -109.9000       5.5        39       113        60
OIR    2025250     91400   20.7700 -109.9100       5.4        40       113        60
OIR    2025250     91400   20.7700 -109.9200       5.3        41       113        60
OIR    2025250     91400   20.7700 -109.9300       5.3        42       113        60
OIR    2025250     91400   20.7700 -109.9400       5.1        44       112        60
OIR    2025250     91400   20.7700 -109.9500       5.1        47       112        60
OIR    2025250     91400   20.7700 -109.9600       5.0        48       113        60
OIR    2025250     91400   20.7700 -109.9700       5.0        49       113        60
OIR    2025250     91400   20.7700 -109.9800       4.9        51       114        60
OIR    2025250     91400   20.7700 -109.9900       4.9        53       116        60
OIR    2025250     91400   20.7700 -110.0000       4.9        53       116        60
OIR    2025250     91400   20.7700 -110.0100       4.8        53       120        60
OIR    2025250     91400   20.7700 -110.0200       4.8        53       122        60
OIR    2025250     91400   20.7700 -110.0300       4.7        54       127        60
OIR    2025250     91400   20.7700 -110.0400       4.7        55       133        60
OIR    2025250     91400   20.7700 -110.0500       4.6        54       138        60
OIR    2025250     91400   20.7600 -109.1000      12.6        87       140        60
OIR    2025250     91400   20.7600 -109.1100       8.3        84       137        60
OIR    2025250     91400   20.7600 -109.1200       8.1        79       134        60
OIR    2025250     91400   20.7600 -109.1300       7.9        75       131        60
OIR    2025250     91400   20.7600 -109.1400       7.0        58       128        60
OIR    2025250     91400   20.7600 -109.1500       7.9        47       123        60
OIR    2025250     91400   20.7600 -109.1600       8.1        45       117        60
OIR    2025250     91400   20.7600 -109.1700       8.2        44       115        60
OIR    2025250     91400   20.7600 -109.1800       8.2        40       112        60
OIR    2025250     91400   20.7600 -109.1900       8.3        37       109        60
OIR    2025250     91400   20.7600 -109.2000       8.4        36       108        60
OIR    2025250     91400   20.7600 -109.2100       8.5        35       107        60
OIR    2025250     91400   20.7600 -109.2200       8.6        35       108        60
OIR    2025250     91400   20.7600 -109.2300       8.7        35       108        60
OIR    2025250     91400   20.7600 -109.2400       8.8        35       107        60
OIR    2025250     91400   20.7600 -109.2500       8.8        35       105        60
OIR    2025250     91400   20.7600 -109.2600       8.8        35       104        60
OIR    2025250     91400   20.7600 -109.2700       8.9        35       104        60
OIR    2025250     91400   20.7600 -109.2800       8.9        35       104        60
OIR    2025250     91400   20.7600 -109.2900       8.9        35       104        60
OIR    2025250     91400   20.7600 -109.3000       8.9        35       104        60
OIR    2025250     91400   20.7600 -109.3100       8.9        35       103        60
OIR    2025250     91400   20.7600 -109.3200       8.9        35       103        60
OIR    2025250     91400   20.7600 -109.3300       8.9        35       103        60
OIR    2025250     91400   20.7600 -109.3400       8.9        35       103        60
OIR    2025250     91400   20.7600 -109.3500       8.9        35       103        60
OIR    2025250     91400   20.7600 -109.3600       8.9        34       103        60
OIR    2025250     91400   20.7600 -109.3700       8.9        34       103        60
OIR    2025250     91400   20.7600 -109.3800       8.9        34       103        60
OIR    2025250     91400   20.7600 -109.3900       8.9        34       103        60
OIR    2025250     91400   20.7600 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.7600 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.7600 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.7600 -109.4300       8.9        34       103        60
OIR    2025250     91400   20.7600 -109.4400       8.8        34       103        60
OIR    2025250     91400   20.7600 -109.4500       8.8        34       103        60
OIR    2025250     91400   20.7600 -109.4600       8.8        34       103        60
OIR    2025250     91400   20.7600 -109.4700       8.8        34       103        60
OIR    2025250     91400   20.7600 -109.4800       8.7        33       104        60
OIR    2025250     91400   20.7600 -109.4900       8.7        33       104        60
OIR    2025250     91400   20.7600 -109.5000       8.6        33       103        60
OIR    2025250     91400   20.7600 -109.5100       8.6        33       103        60
OIR    2025250     91400   20.7600 -109.5200       8.6        33       103        60
OIR    2025250     91400   20.7600 -109.5300       8.5        32       103        60
OIR    2025250     91400   20.7600 -109.5400       8.5        32       103        60
OIR    2025250     91400   20.7600 -109.5500       8.4        32       103        60
OIR    2025250     91400   20.7600 -109.5600       8.4        32       103        60
OIR    2025250     91400   20.7600 -109.5700       8.4        32       103        60
OIR    2025250     91400   20.7600 -109.5800       8.4        32       103        60
OIR    2025250     91400   20.7600 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.7600 -109.6000       8.3        32       103        60
OIR    2025250     91400   20.7600 -109.6100       8.3        32       103        60
OIR    2025250     91400   20.7600 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.7600 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.7600 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.7600 -109.6500       8.1        32       103        60
OIR    2025250     91400   20.7600 -109.6600       8.1        32       103        60
OIR    2025250     91400   20.7600 -109.6700       8.0        32       103        60
OIR    2025250     91400   20.7600 -109.6800       8.0        32       103        60
OIR    2025250     91400   20.7600 -109.6900       7.9        32       103        60
OIR    2025250     91400   20.7600 -109.7000       7.8        32       103        60
OIR    2025250     91400   20.7600 -109.7100       7.7        32       103        60
OIR    2025250     91400   20.7600 -109.7200       7.6        33       103        60
OIR    2025250     91400   20.7600 -109.7300       7.5        33       103        60
OIR    2025250     91400   20.7600 -109.7400       7.4        33       103        60
OIR    2025250     91400   20.7600 -109.7500       7.4        33       103        60
OIR    2025250     91400   20.7600 -109.7600       7.3        33       103        60
OIR    2025250     91400   20.7600 -109.7700       7.3        33       103        60
OIR    2025250     91400   20.7600 -109.7800       7.2        34       103        60
OIR    2025250     91400   20.7600 -109.7900       7.1        34       103        60
OIR    2025250     91400   20.7600 -109.8000       7.0        35       104        60
OIR    2025250     91400   20.7600 -109.8100       6.7        36       104        60
OIR    2025250     91400   20.7600 -109.8200       6.4        37       104        60
OIR    2025250     91400   20.7600 -109.8300       6.1        38       104        60
OIR    2025250     91400   20.7600 -109.8400       5.9        38       105        60
OIR    2025250     91400   20.7600 -109.8500       5.7        39       107        60
OIR    2025250     91400   20.7600 -109.8600       5.7        39       109        60
OIR    2025250     91400   20.7600 -109.8700       5.6        39       110        60
OIR    2025250     91400   20.7600 -109.8800       5.6        39       111        60
OIR    2025250     91400   20.7600 -109.8900       5.5        39       112        60
OIR    2025250     91400   20.7600 -109.9000       5.5        39       112        60
OIR    2025250     91400   20.7600 -109.9100       5.4        40       112        60
OIR    2025250     91400   20.7600 -109.9200       5.4        41       113        60
OIR    2025250     91400   20.7600 -109.9300       5.3        43       113        60
OIR    2025250     91400   20.7600 -109.9400       5.2        45       112        60
OIR    2025250     91400   20.7600 -109.9500       5.1        48       112        60
OIR    2025250     91400   20.7600 -109.9600       5.1        49       113        60
OIR    2025250     91400   20.7600 -109.9700       5.0        50       113        60
OIR    2025250     91400   20.7600 -109.9800       5.0        52       114        60
OIR    2025250     91400   20.7600 -109.9900       4.9        53       115        60
OIR    2025250     91400   20.7600 -110.0000       4.9        53       116        60
OIR    2025250     91400   20.7600 -110.0100       4.8        53       120        60
OIR    2025250     91400   20.7600 -110.0200       4.8        54       124        60
OIR    2025250     91400   20.7600 -110.0300       4.7        59       128        60
OIR    2025250     91400   20.7600 -110.0400       4.6        60       136        60
OIR    2025250     91400   20.7600 -111.2800       7.5        33       165        60
OIR    2025250     91400   20.7600 -111.2900       7.4        32       145        60
OIR    2025250     91400   20.7500 -109.1400       6.5        43       138        60
OIR    2025250     91400   20.7500 -109.1500       7.9        47       131        60
OIR    2025250     91400   20.7500 -109.1600       8.0        46       124        60
OIR    2025250     91400   20.7500 -109.1700       8.0        45       119        60
OIR    2025250     91400   20.7500 -109.1800       7.7        42       115        60
OIR    2025250     91400   20.7500 -109.1900       7.7        38       112        60
OIR    2025250     91400   20.7500 -109.2000       7.9        36       111        60
OIR    2025250     91400   20.7500 -109.2100       8.1        35       110        60
OIR    2025250     91400   20.7500 -109.2200       8.4        34       110        60
OIR    2025250     91400   20.7500 -109.2300       8.6        35       109        60
OIR    2025250     91400   20.7500 -109.2400       8.7        35       109        60
OIR    2025250     91400   20.7500 -109.2500       8.8        35       108        60
OIR    2025250     91400   20.7500 -109.2600       8.8        35       107        60
OIR    2025250     91400   20.7500 -109.2700       8.9        35       107        60
OIR    2025250     91400   20.7500 -109.2800       8.9        35       105        60
OIR    2025250     91400   20.7500 -109.2900       8.9        35       104        60
OIR    2025250     91400   20.7500 -109.3000       8.9        35       104        60
OIR    2025250     91400   20.7500 -109.3100       8.9        35       103        60
OIR    2025250     91400   20.7500 -109.3200       8.9        35       103        60
OIR    2025250     91400   20.7500 -109.3300       8.9        35       103        60
OIR    2025250     91400   20.7500 -109.3400       8.9        35       103        60
OIR    2025250     91400   20.7500 -109.3500       8.9        35       103        60
OIR    2025250     91400   20.7500 -109.3600       8.9        35       103        60
OIR    2025250     91400   20.7500 -109.3700       8.9        34       103        60
OIR    2025250     91400   20.7500 -109.3800       8.9        34       103        60
OIR    2025250     91400   20.7500 -109.3900       8.9        34       103        60
OIR    2025250     91400   20.7500 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.7500 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.7500 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.7500 -109.4300       8.9        34       104        60
OIR    2025250     91400   20.7500 -109.4400       8.8        34       104        60
OIR    2025250     91400   20.7500 -109.4500       8.8        34       104        60
OIR    2025250     91400   20.7500 -109.4600       8.8        34       104        60
OIR    2025250     91400   20.7500 -109.4700       8.8        34       104        60
OIR    2025250     91400   20.7500 -109.4800       8.7        33       104        60
OIR    2025250     91400   20.7500 -109.4900       8.7        33       104        60
OIR    2025250     91400   20.7500 -109.5000       8.6        33       104        60
OIR    2025250     91400   20.7500 -109.5100       8.6        33       103        60
OIR    2025250     91400   20.7500 -109.5200       8.6        33       103        60
OIR    2025250     91400   20.7500 -109.5300       8.5        32       103        60
OIR    2025250     91400   20.7500 -109.5400       8.5        32       103        60
OIR    2025250     91400   20.7500 -109.5500       8.5        32       103        60
OIR    2025250     91400   20.7500 -109.5600       8.4        32       104        60
OIR    2025250     91400   20.7500 -109.5700       8.4        32       103        60
OIR    2025250     91400   20.7500 -109.5800       8.4        32       103        60
OIR    2025250     91400   20.7500 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.7500 -109.6000       8.3        32       103        60
OIR    2025250     91400   20.7500 -109.6100       8.3        32       103        60
OIR    2025250     91400   20.7500 -109.6200       8.3        32       103        60
OIR    2025250     91400   20.7500 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.7500 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.7500 -109.6500       8.1        32       104        60
OIR    2025250     91400   20.7500 -109.6600       8.1        32       104        60
OIR    2025250     91400   20.7500 -109.6700       8.0        32       103        60
OIR    2025250     91400   20.7500 -109.6800       8.0        32       103        60
OIR    2025250     91400   20.7500 -109.6900       7.9        32       103        60
OIR    2025250     91400   20.7500 -109.7000       7.8        32       103        60
OIR    2025250     91400   20.7500 -109.7100       7.8        32       103        60
OIR    2025250     91400   20.7500 -109.7200       7.7        32       103        60
OIR    2025250     91400   20.7500 -109.7300       7.6        33       103        60
OIR    2025250     91400   20.7500 -109.7400       7.5        33       103        60
OIR    2025250     91400   20.7500 -109.7500       7.4        33       103        60
OIR    2025250     91400   20.7500 -109.7600       7.4        33       103        60
OIR    2025250     91400   20.7500 -109.7700       7.3        33       103        60
OIR    2025250     91400   20.7500 -109.7800       7.3        34       103        60
OIR    2025250     91400   20.7500 -109.7900       7.2        34       104        60
OIR    2025250     91400   20.7500 -109.8000       7.0        35       104        60
OIR    2025250     91400   20.7500 -109.8100       6.8        36       104        60
OIR    2025250     91400   20.7500 -109.8200       6.5        37       104        60
OIR    2025250     91400   20.7500 -109.8300       6.2        37       104        60
OIR    2025250     91400   20.7500 -109.8400       5.9        38       107        60
OIR    2025250     91400   20.7500 -109.8500       5.8        38       109        60
OIR    2025250     91400   20.7500 -109.8600       5.7        38       110        60
OIR    2025250     91400   20.7500 -109.8700       5.6        39       110        60
OIR    2025250     91400   20.7500 -109.8800       5.6        39       111        60
OIR    2025250     91400   20.7500 -109.8900       5.6        39       111        60
OIR    2025250     91400   20.7500 -109.9000       5.5        39       111        60
OIR    2025250     91400   20.7500 -109.9100       5.5        40       111        60
OIR    2025250     91400   20.7500 -109.9200       5.4        41       111        60
OIR    2025250     91400   20.7500 -109.9300       5.3        43       112        60
OIR    2025250     91400   20.7500 -109.9400       5.2        45       112        60
OIR    2025250     91400   20.7500 -109.9500       5.2        48       113        60
OIR    2025250     91400   20.7500 -109.9600       5.1        49       114        60
OIR    2025250     91400   20.7500 -109.9700       5.1        50       115        60
OIR    2025250     91400   20.7500 -109.9800       5.0        52       116        60
OIR    2025250     91400   20.7500 -109.9900       5.0        52       116        60
OIR    2025250     91400   20.7500 -110.0000       4.9        53       116        60
OIR    2025250     91400   20.7500 -110.0100       4.7        53       121        60
OIR    2025250     91400   20.7500 -110.0200       4.6        59       125        60
OIR    2025250     91400   20.7500 -110.0300       4.5        77       130        60
OIR    2025250     91400   20.7500 -110.0400       4.5        86       138        60
OIR    2025250     91400   20.7500 -110.2200      20.3         3       140        60
OIR    2025250     91400   20.7400 -109.1600       8.1        47       133        60
OIR    2025250     91400   20.7400 -109.1700       8.1        42       126        60
OIR    2025250     91400   20.7400 -109.1800       7.9        39       122        60
OIR    2025250     91400   20.7400 -109.1900       7.7        37       117        60
OIR    2025250     91400   20.7400 -109.2000       7.9        35       115        60
OIR    2025250     91400   20.7400 -109.2100       8.0        34       114        60
OIR    2025250     91400   20.7400 -109.2200       8.1        34       112        60
OIR    2025250     91400   20.7400 -109.2300       8.3        34       110        60
OIR    2025250     91400   20.7400 -109.2400       8.6        35       109        60
OIR    2025250     91400   20.7400 -109.2500       8.8        35       108        60
OIR    2025250     91400   20.7400 -109.2600       8.8        35       108        60
OIR    2025250     91400   20.7400 -109.2700       8.9        35       107        60
OIR    2025250     91400   20.7400 -109.2800       8.9        35       105        60
OIR    2025250     91400   20.7400 -109.2900       8.9        35       104        60
OIR    2025250     91400   20.7400 -109.3000       8.9        35       104        60
OIR    2025250     91400   20.7400 -109.3100       8.9        35       104        60
OIR    2025250     91400   20.7400 -109.3200       8.9        35       103        60
OIR    2025250     91400   20.7400 -109.3300       8.9        35       103        60
OIR    2025250     91400   20.7400 -109.3400       8.9        35       103        60
OIR    2025250     91400   20.7400 -109.3500       8.9        35       103        60
OIR    2025250     91400   20.7400 -109.3600       8.9        35       103        60
OIR    2025250     91400   20.7400 -109.3700       8.9        34       103        60
OIR    2025250     91400   20.7400 -109.3800       8.9        34       103        60
OIR    2025250     91400   20.7400 -109.3900       8.9        34       103        60
OIR    2025250     91400   20.7400 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.7400 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.7400 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.7400 -109.4300       8.9        34       104        60
OIR    2025250     91400   20.7400 -109.4400       8.8        34       104        60
OIR    2025250     91400   20.7400 -109.4500       8.8        34       105        60
OIR    2025250     91400   20.7400 -109.4600       8.8        34       105        60
OIR    2025250     91400   20.7400 -109.4700       8.8        34       105        60
OIR    2025250     91400   20.7400 -109.4800       8.7        33       104        60
OIR    2025250     91400   20.7400 -109.4900       8.7        33       104        60
OIR    2025250     91400   20.7400 -109.5000       8.6        33       104        60
OIR    2025250     91400   20.7400 -109.5100       8.6        33       103        60
OIR    2025250     91400   20.7400 -109.5200       8.6        33       103        60
OIR    2025250     91400   20.7400 -109.5300       8.5        32       103        60
OIR    2025250     91400   20.7400 -109.5400       8.5        32       103        60
OIR    2025250     91400   20.7400 -109.5500       8.5        32       103        60
OIR    2025250     91400   20.7400 -109.5600       8.4        32       103        60
OIR    2025250     91400   20.7400 -109.5700       8.4        32       103        60
OIR    2025250     91400   20.7400 -109.5800       8.4        32       103        60
OIR    2025250     91400   20.7400 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.7400 -109.6000       8.3        32       103        60
OIR    2025250     91400   20.7400 -109.6100       8.3        32       103        60
OIR    2025250     91400   20.7400 -109.6200       8.3        32       103        60
OIR    2025250     91400   20.7400 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.7400 -109.6400       8.2        32       104        60
OIR    2025250     91400   20.7400 -109.6500       8.1        32       104        60
OIR    2025250     91400   20.7400 -109.6600       8.1        32       104        60
OIR    2025250     91400   20.7400 -109.6700       8.1        32       104        60
OIR    2025250     91400   20.7400 -109.6800       8.0        32       104        60
OIR    2025250     91400   20.7400 -109.6900       7.9        32       103        60
OIR    2025250     91400   20.7400 -109.7000       7.8        32       103        60
OIR    2025250     91400   20.7400 -109.7100       7.8        32       103        60
OIR    2025250     91400   20.7400 -109.7200       7.7        32       103        60
OIR    2025250     91400   20.7400 -109.7300       7.6        33       103        60
OIR    2025250     91400   20.7400 -109.7400       7.5        33       103        60
OIR    2025250     91400   20.7400 -109.7500       7.5        33       103        60
OIR    2025250     91400   20.7400 -109.7600       7.4        33       103        60
OIR    2025250     91400   20.7400 -109.7700       7.4        33       103        60
OIR    2025250     91400   20.7400 -109.7800       7.3        33       103        60
OIR    2025250     91400   20.7400 -109.7900       7.2        34       104        60
OIR    2025250     91400   20.7400 -109.8000       7.1        35       104        60
OIR    2025250     91400   20.7400 -109.8100       6.9        35       107        60
OIR    2025250     91400   20.7400 -109.8200       6.6        36       107        60
OIR    2025250     91400   20.7400 -109.8300       6.2        37       108        60
OIR    2025250     91400   20.7400 -109.8400       6.0        38       109        60
OIR    2025250     91400   20.7400 -109.8500       5.8        38       110        60
OIR    2025250     91400   20.7400 -109.8600       5.7        38       111        60
OIR    2025250     91400   20.7400 -109.8700       5.7        38       111        60
OIR    2025250     91400   20.7400 -109.8800       5.6        39       111        60
OIR    2025250     91400   20.7400 -109.8900       5.6        39       111        60
OIR    2025250     91400   20.7400 -109.9000       5.5        39       111        60
OIR    2025250     91400   20.7400 -109.9100       5.5        40       111        60
OIR    2025250     91400   20.7400 -109.9200       5.4        42       111        60
OIR    2025250     91400   20.7400 -109.9300       5.3        44       111        60
OIR    2025250     91400   20.7400 -109.9400       5.2        46       112        60
OIR    2025250     91400   20.7400 -109.9500       5.2        48       113        60
OIR    2025250     91400   20.7400 -109.9600       5.1        49       115        60
OIR    2025250     91400   20.7400 -109.9700       5.1        50       116        60
OIR    2025250     91400   20.7400 -109.9800       5.1        51       117        60
OIR    2025250     91400   20.7400 -109.9900       5.0        52       117        60
OIR    2025250     91400   20.7400 -110.0000       5.0        52       117        60
OIR    2025250     91400   20.7400 -110.0100       4.3        53       121        60
OIR    2025250     91400   20.7400 -110.0200       4.7        76       126        60
OIR    2025250     91400   20.7400 -110.0300       7.8       113       131        60
OIR    2025250     91400   20.7400 -110.0400       4.7       113       139        60
OIR    2025250     91400   20.7300 -109.1700      10.2        34       133        60
OIR    2025250     91400   20.7300 -109.1800       7.9        35       129        60
OIR    2025250     91400   20.7300 -109.1900       7.9        34       125        60
OIR    2025250     91400   20.7300 -109.2000       8.0        34       121        60
OIR    2025250     91400   20.7300 -109.2100       8.1        34       117        60
OIR    2025250     91400   20.7300 -109.2200       8.1        34       115        60
OIR    2025250     91400   20.7300 -109.2300       8.2        34       112        60
OIR    2025250     91400   20.7300 -109.2400       8.5        34       109        60
OIR    2025250     91400   20.7300 -109.2500       8.7        35       108        60
OIR    2025250     91400   20.7300 -109.2600       8.8        35       107        60
OIR    2025250     91400   20.7300 -109.2700       8.9        35       107        60
OIR    2025250     91400   20.7300 -109.2800       8.9        35       105        60
OIR    2025250     91400   20.7300 -109.2900       8.9        35       104        60
OIR    2025250     91400   20.7300 -109.3000       8.9        35       104        60
OIR    2025250     91400   20.7300 -109.3100       8.9        35       104        60
OIR    2025250     91400   20.7300 -109.3200       9.0        35       103        60
OIR    2025250     91400   20.7300 -109.3300       9.0        35       103        60
OIR    2025250     91400   20.7300 -109.3400       9.0        35       103        60
OIR    2025250     91400   20.7300 -109.3500       9.0        35       103        60
OIR    2025250     91400   20.7300 -109.3600       8.9        35       103        60
OIR    2025250     91400   20.7300 -109.3700       8.9        34       103        60
OIR    2025250     91400   20.7300 -109.3800       8.9        34       103        60
OIR    2025250     91400   20.7300 -109.3900       8.9        34       103        60
OIR    2025250     91400   20.7300 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.7300 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.7300 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.7300 -109.4300       8.9        34       104        60
OIR    2025250     91400   20.7300 -109.4400       8.8        34       104        60
OIR    2025250     91400   20.7300 -109.4500       8.8        34       104        60
OIR    2025250     91400   20.7300 -109.4600       8.8        34       104        60
OIR    2025250     91400   20.7300 -109.4700       8.8        34       104        60
OIR    2025250     91400   20.7300 -109.4800       8.7        33       104        60
OIR    2025250     91400   20.7300 -109.4900       8.7        33       104        60
OIR    2025250     91400   20.7300 -109.5000       8.6        33       104        60
OIR    2025250     91400   20.7300 -109.5100       8.6        33       103        60
OIR    2025250     91400   20.7300 -109.5200       8.5        33       103        60
OIR    2025250     91400   20.7300 -109.5300       8.5        32       103        60
OIR    2025250     91400   20.7300 -109.5400       8.5        32       103        60
OIR    2025250     91400   20.7300 -109.5500       8.4        32       103        60
OIR    2025250     91400   20.7300 -109.5600       8.4        32       103        60
OIR    2025250     91400   20.7300 -109.5700       8.4        32       103        60
OIR    2025250     91400   20.7300 -109.5800       8.4        32       103        60
OIR    2025250     91400   20.7300 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.7300 -109.6000       8.3        32       103        60
OIR    2025250     91400   20.7300 -109.6100       8.3        32       103        60
OIR    2025250     91400   20.7300 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.7300 -109.6300       8.2        32       104        60
OIR    2025250     91400   20.7300 -109.6400       8.2        32       104        60
OIR    2025250     91400   20.7300 -109.6500       8.1        32       104        60
OIR    2025250     91400   20.7300 -109.6600       8.1        32       105        60
OIR    2025250     91400   20.7300 -109.6700       8.1        32       105        60
OIR    2025250     91400   20.7300 -109.6800       8.0        32       104        60
OIR    2025250     91400   20.7300 -109.6900       8.0        32       103        60
OIR    2025250     91400   20.7300 -109.7000       7.9        32       103        60
OIR    2025250     91400   20.7300 -109.7100       7.8        32       103        60
OIR    2025250     91400   20.7300 -109.7200       7.7        32       103        60
OIR    2025250     91400   20.7300 -109.7300       7.7        32       103        60
OIR    2025250     91400   20.7300 -109.7400       7.6        33       103        60
OIR    2025250     91400   20.7300 -109.7500       7.5        33       103        60
OIR    2025250     91400   20.7300 -109.7600       7.4        33       104        60
OIR    2025250     91400   20.7300 -109.7700       7.4        33       104        60
OIR    2025250     91400   20.7300 -109.7800       7.3        33       104        60
OIR    2025250     91400   20.7300 -109.7900       7.3        34       104        60
OIR    2025250     91400   20.7300 -109.8000       7.1        34       105        60
OIR    2025250     91400   20.7300 -109.8100       7.0        35       108        60
OIR    2025250     91400   20.7300 -109.8200       6.7        35       110        60
OIR    2025250     91400   20.7300 -109.8300       6.3        36       111        60
OIR    2025250     91400   20.7300 -109.8400       6.0        37       112        60
OIR    2025250     91400   20.7300 -109.8500       5.8        38       111        60
OIR    2025250     91400   20.7300 -109.8600       5.7        38       111        60
OIR    2025250     91400   20.7300 -109.8700       5.7        38       112        60
OIR    2025250     91400   20.7300 -109.8800       5.6        39       112        60
OIR    2025250     91400   20.7300 -109.8900       5.6        39       112        60
OIR    2025250     91400   20.7300 -109.9000       5.6        39       112        60
OIR    2025250     91400   20.7300 -109.9100       5.5        40       111        60
OIR    2025250     91400   20.7300 -109.9200       5.4        42       112        60
OIR    2025250     91400   20.7300 -109.9300       5.3        44       112        60
OIR    2025250     91400   20.7300 -109.9400       5.2        46       113        60
OIR    2025250     91400   20.7300 -109.9500       5.2        48       114        60
OIR    2025250     91400   20.7300 -109.9600       5.1        49       115        60
OIR    2025250     91400   20.7300 -109.9700       5.1        49       116        60
OIR    2025250     91400   20.7300 -109.9800       5.1        50       116        60
OIR    2025250     91400   20.7300 -109.9900       5.0        51       119        60
OIR    2025250     91400   20.7300 -110.0000       5.0        51       120        60
OIR    2025250     91400   20.7300 -110.0200       6.1       122       132        60
OIR    2025250     91400   20.7300 -110.0300      11.2       121       141        60
OIR    2025250     91400   20.7200 -109.1800       8.3        31       139        60
OIR    2025250     91400   20.7200 -109.1900       8.0        33       133        60
OIR    2025250     91400   20.7200 -109.2000       8.0        33       127        60
OIR    2025250     91400   20.7200 -109.2100       8.1        34       121        60
OIR    2025250     91400   20.7200 -109.2200       8.2        34       116        60
OIR    2025250     91400   20.7200 -109.2300       8.2        34       113        60
OIR    2025250     91400   20.7200 -109.2400       8.5        34       109        60
OIR    2025250     91400   20.7200 -109.2500       8.8        35       107        60
OIR    2025250     91400   20.7200 -109.2600       8.9        35       105        60
OIR    2025250     91400   20.7200 -109.2700       8.9        35       105        60
OIR    2025250     91400   20.7200 -109.2800       8.9        35       104        60
OIR    2025250     91400   20.7200 -109.2900       8.9        35       104        60
OIR    2025250     91400   20.7200 -109.3000       9.0        35       104        60
OIR    2025250     91400   20.7200 -109.3100       9.0        35       103        60
OIR    2025250     91400   20.7200 -109.3200       9.0        35       103        60
OIR    2025250     91400   20.7200 -109.3300       9.0        35       103        60
OIR    2025250     91400   20.7200 -109.3400       9.0        35       103        60
OIR    2025250     91400   20.7200 -109.3500       9.0        35       103        60
OIR    2025250     91400   20.7200 -109.3600       9.0        35       103        60
OIR    2025250     91400   20.7200 -109.3700       9.0        35       103        60
OIR    2025250     91400   20.7200 -109.3800       8.9        34       103        60
OIR    2025250     91400   20.7200 -109.3900       8.9        34       103        60
OIR    2025250     91400   20.7200 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.7200 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.7200 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.7200 -109.4300       8.9        34       104        60
OIR    2025250     91400   20.7200 -109.4400       8.8        34       104        60
OIR    2025250     91400   20.7200 -109.4500       8.8        34       104        60
OIR    2025250     91400   20.7200 -109.4600       8.8        34       104        60
OIR    2025250     91400   20.7200 -109.4700       8.7        34       103        60
OIR    2025250     91400   20.7200 -109.4800       8.7        33       103        60
OIR    2025250     91400   20.7200 -109.4900       8.7        33       103        60
OIR    2025250     91400   20.7200 -109.5000       8.6        33       103        60
OIR    2025250     91400   20.7200 -109.5100       8.6        33       103        60
OIR    2025250     91400   20.7200 -109.5200       8.5        33       103        60
OIR    2025250     91400   20.7200 -109.5300       8.5        32       103        60
OIR    2025250     91400   20.7200 -109.5400       8.5        32       103        60
OIR    2025250     91400   20.7200 -109.5500       8.4        32       103        60
OIR    2025250     91400   20.7200 -109.5600       8.4        32       103        60
OIR    2025250     91400   20.7200 -109.5700       8.4        32       103        60
OIR    2025250     91400   20.7200 -109.5800       8.4        32       103        60
OIR    2025250     91400   20.7200 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.7200 -109.6000       8.3        32       103        60
OIR    2025250     91400   20.7200 -109.6100       8.3        32       104        60
OIR    2025250     91400   20.7200 -109.6200       8.2        32       104        60
OIR    2025250     91400   20.7200 -109.6300       8.2        32       104        60
OIR    2025250     91400   20.7200 -109.6400       8.2        32       105        60
OIR    2025250     91400   20.7200 -109.6500       8.2        32       105        60
OIR    2025250     91400   20.7200 -109.6600       8.1        32       105        60
OIR    2025250     91400   20.7200 -109.6700       8.1        32       105        60
OIR    2025250     91400   20.7200 -109.6800       8.0        32       104        60
OIR    2025250     91400   20.7200 -109.6900       8.0        32       103        60
OIR    2025250     91400   20.7200 -109.7000       7.9        32       103        60
OIR    2025250     91400   20.7200 -109.7100       7.9        32       103        60
OIR    2025250     91400   20.7200 -109.7200       7.8        32       103        60
OIR    2025250     91400   20.7200 -109.7300       7.7        32       103        60
OIR    2025250     91400   20.7200 -109.7400       7.6        33       103        60
OIR    2025250     91400   20.7200 -109.7500       7.5        33       104        60
OIR    2025250     91400   20.7200 -109.7600       7.5        33       104        60
OIR    2025250     91400   20.7200 -109.7700       7.4        33       104        60
OIR    2025250     91400   20.7200 -109.7800       7.4        33       105        60
OIR    2025250     91400   20.7200 -109.7900       7.3        33       107        60
OIR    2025250     91400   20.7200 -109.8000       7.2        33       108        60
OIR    2025250     91400   20.7200 -109.8100       7.1        34       110        60
OIR    2025250     91400   20.7200 -109.8200       6.9        35       111        60
OIR    2025250     91400   20.7200 -109.8300       6.5        36       112        60
OIR    2025250     91400   20.7200 -109.8400       6.1        37       114        60
OIR    2025250     91400   20.7200 -109.8500       5.9        38       113        60
OIR    2025250     91400   20.7200 -109.8600       5.8        38       112        60
OIR    2025250     91400   20.7200 -109.8700       5.7        38       113        60
OIR    2025250     91400   20.7200 -109.8800       5.6        38       114        60
OIR    2025250     91400   20.7200 -109.8900       5.6        39       115        60
OIR    2025250     91400   20.7200 -109.9000       5.6        39       113        60
OIR    2025250     91400   20.7200 -109.9100       5.5        40       112        60
OIR    2025250     91400   20.7200 -109.9200       5.4        42       112        60
OIR    2025250     91400   20.7200 -109.9300       5.3        44       113        60
OIR    2025250     91400   20.7200 -109.9400       5.2        46       113        60
OIR    2025250     91400   20.7200 -109.9500       5.1        48       114        60
OIR    2025250     91400   20.7200 -109.9600       5.1        48       116        60
OIR    2025250     91400   20.7200 -109.9700       5.1        49       116        60
OIR    2025250     91400   20.7200 -109.9800       5.1        49       116        60
OIR    2025250     91400   20.7200 -109.9900       5.1        50       117        60
OIR    2025250     91400   20.7200 -110.0000       4.9        53       121        60
OIR    2025250     91400   20.7200 -110.0200      13.1       148       137        60
OIR    2025250     91400   20.7100 -109.2000       8.1        33       133        60
OIR    2025250     91400   20.7100 -109.2100       8.3        34       126        60
OIR    2025250     91400   20.7100 -109.2200       8.4        34       119        60
OIR    2025250     91400   20.7100 -109.2300       8.4        34       114        60
OIR    2025250     91400   20.7100 -109.2400       8.5        34       109        60
OIR    2025250     91400   20.7100 -109.2500       8.8        35       104        60
OIR    2025250     91400   20.7100 -109.2600       8.9        35       104        60
OIR    2025250     91400   20.7100 -109.2700       8.9        35       104        60
OIR    2025250     91400   20.7100 -109.2800       8.9        35       104        60
OIR    2025250     91400   20.7100 -109.2900       9.0        35       104        60
OIR    2025250     91400   20.7100 -109.3000       9.0        35       103        60
OIR    2025250     91400   20.7100 -109.3100       9.0        35       103        60
OIR    2025250     91400   20.7100 -109.3200       9.0        35       103        60
OIR    2025250     91400   20.7100 -109.3300       9.0        35       103        60
OIR    2025250     91400   20.7100 -109.3400       9.0        35       103        60
OIR    2025250     91400   20.7100 -109.3500       9.0        35       103        60
OIR    2025250     91400   20.7100 -109.3600       9.0        35       103        60
OIR    2025250     91400   20.7100 -109.3700       9.0        35       103        60
OIR    2025250     91400   20.7100 -109.3800       8.9        35       103        60
OIR    2025250     91400   20.7100 -109.3900       8.9        34       103        60
OIR    2025250     91400   20.7100 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.7100 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.7100 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.7100 -109.4300       8.9        34       103        60
OIR    2025250     91400   20.7100 -109.4400       8.8        34       104        60
OIR    2025250     91400   20.7100 -109.4500       8.8        34       104        60
OIR    2025250     91400   20.7100 -109.4600       8.8        34       104        60
OIR    2025250     91400   20.7100 -109.4700       8.7        34       103        60
OIR    2025250     91400   20.7100 -109.4800       8.7        33       103        60
OIR    2025250     91400   20.7100 -109.4900       8.6        33       103        60
OIR    2025250     91400   20.7100 -109.5000       8.6        33       103        60
OIR    2025250     91400   20.7100 -109.5100       8.6        33       103        60
OIR    2025250     91400   20.7100 -109.5200       8.5        33       103        60
OIR    2025250     91400   20.7100 -109.5300       8.5        32       103        60
OIR    2025250     91400   20.7100 -109.5400       8.5        32       103        60
OIR    2025250     91400   20.7100 -109.5500       8.4        32       103        60
OIR    2025250     91400   20.7100 -109.5600       8.4        32       103        60
OIR    2025250     91400   20.7100 -109.5700       8.4        32       103        60
OIR    2025250     91400   20.7100 -109.5800       8.3        32       103        60
OIR    2025250     91400   20.7100 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.7100 -109.6000       8.3        32       103        60
OIR    2025250     91400   20.7100 -109.6100       8.3        32       104        60
OIR    2025250     91400   20.7100 -109.6200       8.3        32       104        60
OIR    2025250     91400   20.7100 -109.6300       8.2        32       105        60
OIR    2025250     91400   20.7100 -109.6400       8.2        32       107        60
OIR    2025250     91400   20.7100 -109.6500       8.2        32       107        60
OIR    2025250     91400   20.7100 -109.6600       8.1        32       105        60
OIR    2025250     91400   20.7100 -109.6700       8.1        32       105        60
OIR    2025250     91400   20.7100 -109.6800       8.0        32       104        60
OIR    2025250     91400   20.7100 -109.6900       8.0        32       104        60
OIR    2025250     91400   20.7100 -109.7000       8.0        32       103        60
OIR    2025250     91400   20.7100 -109.7100       7.9        32       103        60
OIR    2025250     91400   20.7100 -109.7200       7.8        32       103        60
OIR    2025250     91400   20.7100 -109.7300       7.7        32       103        60
OIR    2025250     91400   20.7100 -109.7400       7.6        33       104        60
OIR    2025250     91400   20.7100 -109.7500       7.6        33       104        60
OIR    2025250     91400   20.7100 -109.7600       7.5        33       104        60
OIR    2025250     91400   20.7100 -109.7700       7.5        33       105        60
OIR    2025250     91400   20.7100 -109.7800       7.4        33       108        60
OIR    2025250     91400   20.7100 -109.7900       7.4        33       110        60
OIR    2025250     91400   20.7100 -109.8000       7.3        33       111        60
OIR    2025250     91400   20.7100 -109.8100       7.3        33       112        60
OIR    2025250     91400   20.7100 -109.8200       7.1        34       112        60
OIR    2025250     91400   20.7100 -109.8300       6.8        35       113        60
OIR    2025250     91400   20.7100 -109.8400       6.3        36       114        60
OIR    2025250     91400   20.7100 -109.8500       5.9        37       114        60
OIR    2025250     91400   20.7100 -109.8600       5.8        38       114        60
OIR    2025250     91400   20.7100 -109.8700       5.7        38       114        60
OIR    2025250     91400   20.7100 -109.8800       5.6        38       116        60
OIR    2025250     91400   20.7100 -109.8900       5.6        39       117        60
OIR    2025250     91400   20.7100 -109.9000       5.6        39       116        60
OIR    2025250     91400   20.7100 -109.9100       5.5        40       115        60
OIR    2025250     91400   20.7100 -109.9200       5.4        42       114        60
OIR    2025250     91400   20.7100 -109.9300       5.3        44       114        60
OIR    2025250     91400   20.7100 -109.9400       5.2        46       114        60
OIR    2025250     91400   20.7100 -109.9500       5.1        48       115        60
OIR    2025250     91400   20.7100 -109.9600       5.1        48       116        60
OIR    2025250     91400   20.7100 -109.9700       5.1        49       116        60
OIR    2025250     91400   20.7100 -109.9800       5.1        49       119        60
OIR    2025250     91400   20.7100 -109.9900       5.1        50       120        60
OIR    2025250     91400   20.7100 -110.0000       5.1        50       125        60
OIR    2025250     91400   20.7100 -110.0100       6.2        82       129        60
OIR    2025250     91400   20.7000 -109.2100       8.7        34       135        60
OIR    2025250     91400   20.7000 -109.2200       8.6        34       125        60
OIR    2025250     91400   20.7000 -109.2300       8.6        35       117        60
OIR    2025250     91400   20.7000 -109.2400       8.8        36       113        60
OIR    2025250     91400   20.7000 -109.2500       8.9        37       108        60
OIR    2025250     91400   20.7000 -109.2600       9.0        36       105        60
OIR    2025250     91400   20.7000 -109.2700       9.0        36       104        60
OIR    2025250     91400   20.7000 -109.2800       9.1        35       104        60
OIR    2025250     91400   20.7000 -109.2900       9.1        35       104        60
OIR    2025250     91400   20.7000 -109.3000       9.1        35       104        60
OIR    2025250     91400   20.7000 -109.3100       9.1        35       103        60
OIR    2025250     91400   20.7000 -109.3200       9.0        35       103        60
OIR    2025250     91400   20.7000 -109.3300       9.0        35       103        60
OIR    2025250     91400   20.7000 -109.3400       9.0        35       103        60
OIR    2025250     91400   20.7000 -109.3500       9.0        35       103        60
OIR    2025250     91400   20.7000 -109.3600       9.0        35       103        60
OIR    2025250     91400   20.7000 -109.3700       9.0        35       103        60
OIR    2025250     91400   20.7000 -109.3800       9.0        35       103        60
OIR    2025250     91400   20.7000 -109.3900       8.9        35       103        60
OIR    2025250     91400   20.7000 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.7000 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.7000 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.7000 -109.4300       8.9        34       103        60
OIR    2025250     91400   20.7000 -109.4400       8.8        34       103        60
OIR    2025250     91400   20.7000 -109.4500       8.8        34       103        60
OIR    2025250     91400   20.7000 -109.4600       8.7        34       103        60
OIR    2025250     91400   20.7000 -109.4700       8.7        34       103        60
OIR    2025250     91400   20.7000 -109.4800       8.7        33       103        60
OIR    2025250     91400   20.7000 -109.4900       8.6        33       103        60
OIR    2025250     91400   20.7000 -109.5000       8.6        33       103        60
OIR    2025250     91400   20.7000 -109.5100       8.5        33       103        60
OIR    2025250     91400   20.7000 -109.5200       8.5        33       103        60
OIR    2025250     91400   20.7000 -109.5300       8.5        33       103        60
OIR    2025250     91400   20.7000 -109.5400       8.4        32       103        60
OIR    2025250     91400   20.7000 -109.5500       8.4        32       103        60
OIR    2025250     91400   20.7000 -109.5600       8.4        32       103        60
OIR    2025250     91400   20.7000 -109.5700       8.4        32       103        60
OIR    2025250     91400   20.7000 -109.5800       8.3        32       103        60
OIR    2025250     91400   20.7000 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.7000 -109.6000       8.3        32       103        60
OIR    2025250     91400   20.7000 -109.6100       8.3        32       103        60
OIR    2025250     91400   20.7000 -109.6200       8.2        32       104        60
OIR    2025250     91400   20.7000 -109.6300       8.2        32       104        60
OIR    2025250     91400   20.7000 -109.6400       8.2        32       104        60
OIR    2025250     91400   20.7000 -109.6500       8.2        32       104        60
OIR    2025250     91400   20.7000 -109.6600       8.1        32       104        60
OIR    2025250     91400   20.7000 -109.6700       8.1        32       104        60
OIR    2025250     91400   20.7000 -109.6800       8.1        32       104        60
OIR    2025250     91400   20.7000 -109.6900       8.0        32       103        60
OIR    2025250     91400   20.7000 -109.7000       8.0        32       103        60
OIR    2025250     91400   20.7000 -109.7100       7.9        32       103        60
OIR    2025250     91400   20.7000 -109.7200       7.8        32       103        60
OIR    2025250     91400   20.7000 -109.7300       7.7        33       103        60
OIR    2025250     91400   20.7000 -109.7400       7.7        33       104        60
OIR    2025250     91400   20.7000 -109.7500       7.6        33       104        60
OIR    2025250     91400   20.7000 -109.7600       7.6        33       105        60
OIR    2025250     91400   20.7000 -109.7700       7.5        33       107        60
OIR    2025250     91400   20.7000 -109.7800       7.5        33       109        60
OIR    2025250     91400   20.7000 -109.7900       7.4        33       112        60
OIR    2025250     91400   20.7000 -109.8000       7.4        33       113        60
OIR    2025250     91400   20.7000 -109.8100       7.3        33       113        60
OIR    2025250     91400   20.7000 -109.8200       7.3        33       113        60
OIR    2025250     91400   20.7000 -109.8300       7.0        34       113        60
OIR    2025250     91400   20.7000 -109.8400       6.6        35       114        60
OIR    2025250     91400   20.7000 -109.8500       6.1        36       114        60
OIR    2025250     91400   20.7000 -109.8600       5.8        37       115        60
OIR    2025250     91400   20.7000 -109.8700       5.7        38       115        60
OIR    2025250     91400   20.7000 -109.8800       5.6        38       116        60
OIR    2025250     91400   20.7000 -109.8900       5.6        38       119        60
OIR    2025250     91400   20.7000 -109.9000       5.6        39       119        60
OIR    2025250     91400   20.7000 -109.9100       5.5        39       116        60
OIR    2025250     91400   20.7000 -109.9200       5.4        41       115        60
OIR    2025250     91400   20.7000 -109.9300       5.3        43       115        60
OIR    2025250     91400   20.7000 -109.9400       5.2        45       115        60
OIR    2025250     91400   20.7000 -109.9500       5.1        47       115        60
OIR    2025250     91400   20.7000 -109.9600       5.1        48       116        60
OIR    2025250     91400   20.7000 -109.9700       5.1        48       117        60
OIR    2025250     91400   20.7000 -109.9800       5.1        49       120        60
OIR    2025250     91400   20.7000 -109.9900       4.9        48       122        60
OIR    2025250     91400   20.7000 -110.0000       4.8        53       127        60
OIR    2025250     91400   20.7000 -110.0100       7.3       100       134        60
OIR    2025250     91400   20.6900 -109.2200       9.0        35       134        60
OIR    2025250     91400   20.6900 -109.2300       9.1        36       124        60
OIR    2025250     91400   20.6900 -109.2400       9.2        37       120        60
OIR    2025250     91400   20.6900 -109.2500       9.2        37       115        60
OIR    2025250     91400   20.6900 -109.2600       9.1        37       112        60
OIR    2025250     91400   20.6900 -109.2700       9.1        36       110        60
OIR    2025250     91400   20.6900 -109.2800       9.1        36       108        60
OIR    2025250     91400   20.6900 -109.2900       9.1        35       107        60
OIR    2025250     91400   20.6900 -109.3000       9.1        35       105        60
OIR    2025250     91400   20.6900 -109.3100       9.1        35       104        60
OIR    2025250     91400   20.6900 -109.3200       9.1        35       104        60
OIR    2025250     91400   20.6900 -109.3300       9.0        35       104        60
OIR    2025250     91400   20.6900 -109.3400       9.0        35       104        60
OIR    2025250     91400   20.6900 -109.3500       9.0        35       103        60
OIR    2025250     91400   20.6900 -109.3600       9.0        35       103        60
OIR    2025250     91400   20.6900 -109.3700       9.0        35       103        60
OIR    2025250     91400   20.6900 -109.3800       9.0        35       103        60
OIR    2025250     91400   20.6900 -109.3900       8.9        35       103        60
OIR    2025250     91400   20.6900 -109.4000       8.9        34       103        60
OIR    2025250     91400   20.6900 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.6900 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.6900 -109.4300       8.9        34       103        60
OIR    2025250     91400   20.6900 -109.4400       8.8        34       103        60
OIR    2025250     91400   20.6900 -109.4500       8.8        34       103        60
OIR    2025250     91400   20.6900 -109.4600       8.7        34       103        60
OIR    2025250     91400   20.6900 -109.4700       8.7        34       103        60
OIR    2025250     91400   20.6900 -109.4800       8.6        33       103        60
OIR    2025250     91400   20.6900 -109.4900       8.6        33       103        60
OIR    2025250     91400   20.6900 -109.5000       8.5        33       103        60
OIR    2025250     91400   20.6900 -109.5100       8.5        33       103        60
OIR    2025250     91400   20.6900 -109.5200       8.5        33       103        60
OIR    2025250     91400   20.6900 -109.5300       8.4        33       103        60
OIR    2025250     91400   20.6900 -109.5400       8.4        32       103        60
OIR    2025250     91400   20.6900 -109.5500       8.4        32       103        60
OIR    2025250     91400   20.6900 -109.5600       8.4        32       103        60
OIR    2025250     91400   20.6900 -109.5700       8.3        32       103        60
OIR    2025250     91400   20.6900 -109.5800       8.3        32       103        60
OIR    2025250     91400   20.6900 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.6900 -109.6000       8.3        32       103        60
OIR    2025250     91400   20.6900 -109.6100       8.3        32       103        60
OIR    2025250     91400   20.6900 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.6900 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.6900 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.6900 -109.6500       8.2        32       103        60
OIR    2025250     91400   20.6900 -109.6600       8.2        32       103        60
OIR    2025250     91400   20.6900 -109.6700       8.1        32       103        60
OIR    2025250     91400   20.6900 -109.6800       8.1        32       103        60
OIR    2025250     91400   20.6900 -109.6900       8.0        32       103        60
OIR    2025250     91400   20.6900 -109.7000       8.0        32       103        60
OIR    2025250     91400   20.6900 -109.7100       7.9        32       103        60
OIR    2025250     91400   20.6900 -109.7200       7.9        32       103        60
OIR    2025250     91400   20.6900 -109.7300       7.8        33       103        60
OIR    2025250     91400   20.6900 -109.7400       7.7        33       104        60
OIR    2025250     91400   20.6900 -109.7500       7.6        33       104        60
OIR    2025250     91400   20.6900 -109.7600       7.6        33       107        60
OIR    2025250     91400   20.6900 -109.7700       7.6        33       108        60
OIR    2025250     91400   20.6900 -109.7800       7.5        33       110        60
OIR    2025250     91400   20.6900 -109.7900       7.5        33       112        60
OIR    2025250     91400   20.6900 -109.8000       7.4        33       114        60
OIR    2025250     91400   20.6900 -109.8100       7.4        33       113        60
OIR    2025250     91400   20.6900 -109.8200       7.3        33       113        60
OIR    2025250     91400   20.6900 -109.8300       7.2        33       113        60
OIR    2025250     91400   20.6900 -109.8400       6.9        34       113        60
OIR    2025250     91400   20.6900 -109.8500       6.4        35       113        60
OIR    2025250     91400   20.6900 -109.8600       6.0        36       115        60
OIR    2025250     91400   20.6900 -109.8700       5.8        37       116        60
OIR    2025250     91400   20.6900 -109.8800       5.7        37       116        60
OIR    2025250     91400   20.6900 -109.8900       5.6        38       117        60
OIR    2025250     91400   20.6900 -109.9000       5.5        38       117        60
OIR    2025250     91400   20.6900 -109.9100       5.5        39       116        60
OIR    2025250     91400   20.6900 -109.9200       5.4        40       113        60
OIR    2025250     91400   20.6900 -109.9300       5.3        42       114        60
OIR    2025250     91400   20.6900 -109.9400       5.2        44       114        60
OIR    2025250     91400   20.6900 -109.9500       5.1        47       115        60
OIR    2025250     91400   20.6900 -109.9600       5.1        48       116        60
OIR    2025250     91400   20.6900 -109.9700       5.0        48       116        60
OIR    2025250     91400   20.6900 -109.9800       4.9        49       119        60
OIR    2025250     91400   20.6900 -109.9900       4.0        52       121        60
OIR    2025250     91400   20.6900 -110.0100       8.6       117       138        60
OIR    2025250     91400   20.6800 -109.2300       9.3        36       130        60
OIR    2025250     91400   20.6800 -109.2400       9.2        37       125        60
OIR    2025250     91400   20.6800 -109.2500       9.1        37       120        60
OIR    2025250     91400   20.6800 -109.2600       9.1        37       116        60
OIR    2025250     91400   20.6800 -109.2700       9.2        37       113        60
OIR    2025250     91400   20.6800 -109.2800       9.2        36       111        60
OIR    2025250     91400   20.6800 -109.2900       9.3        36       109        60
OIR    2025250     91400   20.6800 -109.3000       9.2        35       107        60
OIR    2025250     91400   20.6800 -109.3100       9.2        35       105        60
OIR    2025250     91400   20.6800 -109.3200       9.1        35       105        60
OIR    2025250     91400   20.6800 -109.3300       9.1        35       104        60
OIR    2025250     91400   20.6800 -109.3400       9.0        35       104        60
OIR    2025250     91400   20.6800 -109.3500       9.0        35       104        60
OIR    2025250     91400   20.6800 -109.3600       9.0        35       103        60
OIR    2025250     91400   20.6800 -109.3700       9.0        35       103        60
OIR    2025250     91400   20.6800 -109.3800       9.0        35       103        60
OIR    2025250     91400   20.6800 -109.3900       9.0        35       103        60
OIR    2025250     91400   20.6800 -109.4000       8.9        35       103        60
OIR    2025250     91400   20.6800 -109.4100       8.9        34       103        60
OIR    2025250     91400   20.6800 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.6800 -109.4300       8.9        34       103        60
OIR    2025250     91400   20.6800 -109.4400       8.8        34       103        60
OIR    2025250     91400   20.6800 -109.4500       8.7        34       103        60
OIR    2025250     91400   20.6800 -109.4600       8.7        34       103        60
OIR    2025250     91400   20.6800 -109.4700       8.6        34       103        60
OIR    2025250     91400   20.6800 -109.4800       8.6        33       103        60
OIR    2025250     91400   20.6800 -109.4900       8.5        33       103        60
OIR    2025250     91400   20.6800 -109.5000       8.5        33       103        60
OIR    2025250     91400   20.6800 -109.5100       8.5        33       103        60
OIR    2025250     91400   20.6800 -109.5200       8.4        33       103        60
OIR    2025250     91400   20.6800 -109.5300       8.4        33       103        60
OIR    2025250     91400   20.6800 -109.5400       8.4        33       103        60
OIR    2025250     91400   20.6800 -109.5500       8.4        32       103        60
OIR    2025250     91400   20.6800 -109.5600       8.4        32       103        60
OIR    2025250     91400   20.6800 -109.5700       8.3        32       103        60
OIR    2025250     91400   20.6800 -109.5800       8.3        32       103        60
OIR    2025250     91400   20.6800 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.6800 -109.6000       8.3        32       104        60
OIR    2025250     91400   20.6800 -109.6100       8.3        32       104        60
OIR    2025250     91400   20.6800 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.6800 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.6800 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.6800 -109.6500       8.2        32       103        60
OIR    2025250     91400   20.6800 -109.6600       8.2        32       103        60
OIR    2025250     91400   20.6800 -109.6700       8.1        32       103        60
OIR    2025250     91400   20.6800 -109.6800       8.1        32       103        60
OIR    2025250     91400   20.6800 -109.6900       8.1        32       103        60
OIR    2025250     91400   20.6800 -109.7000       8.0        32       103        60
OIR    2025250     91400   20.6800 -109.7100       8.0        32       103        60
OIR    2025250     91400   20.6800 -109.7200       7.9        32       103        60
OIR    2025250     91400   20.6800 -109.7300       7.8        33       104        60
OIR    2025250     91400   20.6800 -109.7400       7.7        33       104        60
OIR    2025250     91400   20.6800 -109.7500       7.7        33       105        60
OIR    2025250     91400   20.6800 -109.7600       7.6        32       108        60
OIR    2025250     91400   20.6800 -109.7700       7.6        33       110        60
OIR    2025250     91400   20.6800 -109.7800       7.5        33       112        60
OIR    2025250     91400   20.6800 -109.7900       7.5        33       113        60
OIR    2025250     91400   20.6800 -109.8000       7.5        33       115        60
OIR    2025250     91400   20.6800 -109.8100       7.4        32       115        60
OIR    2025250     91400   20.6800 -109.8200       7.4        32       113        60
OIR    2025250     91400   20.6800 -109.8300       7.3        32       113        60
OIR    2025250     91400   20.6800 -109.8400       7.2        33       114        60
OIR    2025250     91400   20.6800 -109.8500       6.8        33       114        60
OIR    2025250     91400   20.6800 -109.8600       6.3        35       116        60
OIR    2025250     91400   20.6800 -109.8700       5.9        36       116        60
OIR    2025250     91400   20.6800 -109.8800       5.7        36       117        60
OIR    2025250     91400   20.6800 -109.8900       5.6        37       117        60
OIR    2025250     91400   20.6800 -109.9000       5.5        37       119        60
OIR    2025250     91400   20.6800 -109.9100       5.5        38       116        60
OIR    2025250     91400   20.6800 -109.9200       5.4        39       113        60
OIR    2025250     91400   20.6800 -109.9300       5.3        41       113        60
OIR    2025250     91400   20.6800 -109.9400       5.1        43       114        60
OIR    2025250     91400   20.6800 -109.9500       5.1        46       115        60
OIR    2025250     91400   20.6800 -109.9600       5.0        48       115        60
OIR    2025250     91400   20.6800 -109.9700       5.0        49       116        60
OIR    2025250     91400   20.6800 -109.9800       4.8        50       117        60
OIR    2025250     91400   20.6800 -110.0000       5.1       125       125        60
OIR    2025250     91400   20.6800 -110.0100       5.8       121       141        60
OIR    2025250     91400   20.6700 -109.2300       9.9        36       137        60
OIR    2025250     91400   20.6700 -109.2400       9.2        37       129        60
OIR    2025250     91400   20.6700 -109.2500       9.1        37       123        60
OIR    2025250     91400   20.6700 -109.2600       9.1        37       117        60
OIR    2025250     91400   20.6700 -109.2700       9.2        37       115        60
OIR    2025250     91400   20.6700 -109.2800       9.3        36       112        60
OIR    2025250     91400   20.6700 -109.2900       9.5        36       110        60
OIR    2025250     91400   20.6700 -109.3000       9.4        36       108        60
OIR    2025250     91400   20.6700 -109.3100       9.4        36       107        60
OIR    2025250     91400   20.6700 -109.3200       9.3        35       105        60
OIR    2025250     91400   20.6700 -109.3300       9.2        35       104        60
OIR    2025250     91400   20.6700 -109.3400       9.1        35       104        60
OIR    2025250     91400   20.6700 -109.3500       9.0        35       104        60
OIR    2025250     91400   20.6700 -109.3600       9.0        35       103        60
OIR    2025250     91400   20.6700 -109.3700       9.0        35       103        60
OIR    2025250     91400   20.6700 -109.3800       9.0        35       103        60
OIR    2025250     91400   20.6700 -109.3900       9.0        35       103        60
OIR    2025250     91400   20.6700 -109.4000       8.9        35       103        60
OIR    2025250     91400   20.6700 -109.4100       8.9        35       103        60
OIR    2025250     91400   20.6700 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.6700 -109.4300       8.9        34       103        60
OIR    2025250     91400   20.6700 -109.4400       8.8        34       103        60
OIR    2025250     91400   20.6700 -109.4500       8.7        34       103        60
OIR    2025250     91400   20.6700 -109.4600       8.7        34       103        60
OIR    2025250     91400   20.6700 -109.4700       8.6        34       103        60
OIR    2025250     91400   20.6700 -109.4800       8.5        34       103        60
OIR    2025250     91400   20.6700 -109.4900       8.5        33       103        60
OIR    2025250     91400   20.6700 -109.5000       8.5        33       103        60
OIR    2025250     91400   20.6700 -109.5100       8.4        33       103        60
OIR    2025250     91400   20.6700 -109.5200       8.4        33       103        60
OIR    2025250     91400   20.6700 -109.5300       8.4        33       103        60
OIR    2025250     91400   20.6700 -109.5400       8.4        33       103        60
OIR    2025250     91400   20.6700 -109.5500       8.4        33       103        60
OIR    2025250     91400   20.6700 -109.5600       8.3        32       103        60
OIR    2025250     91400   20.6700 -109.5700       8.3        32       103        60
OIR    2025250     91400   20.6700 -109.5800       8.3        32       103        60
OIR    2025250     91400   20.6700 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.6700 -109.6000       8.3        32       104        60
OIR    2025250     91400   20.6700 -109.6100       8.2        32       104        60
OIR    2025250     91400   20.6700 -109.6200       8.2        32       104        60
OIR    2025250     91400   20.6700 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.6700 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.6700 -109.6500       8.2        32       103        60
OIR    2025250     91400   20.6700 -109.6600       8.2        32       103        60
OIR    2025250     91400   20.6700 -109.6700       8.2        32       103        60
OIR    2025250     91400   20.6700 -109.6800       8.1        32       103        60
OIR    2025250     91400   20.6700 -109.6900       8.1        32       103        60
OIR    2025250     91400   20.6700 -109.7000       8.1        32       103        60
OIR    2025250     91400   20.6700 -109.7100       8.0        32       103        60
OIR    2025250     91400   20.6700 -109.7200       8.0        32       103        60
OIR    2025250     91400   20.6700 -109.7300       7.9        32       103        60
OIR    2025250     91400   20.6700 -109.7400       7.8        32       104        60
OIR    2025250     91400   20.6700 -109.7500       7.7        32       107        60
OIR    2025250     91400   20.6700 -109.7600       7.6        32       109        60
OIR    2025250     91400   20.6700 -109.7700       7.6        32       112        60
OIR    2025250     91400   20.6700 -109.7800       7.6        32       114        60
OIR    2025250     91400   20.6700 -109.7900       7.5        32       115        60
OIR    2025250     91400   20.6700 -109.8000       7.5        32       116        60
OIR    2025250     91400   20.6700 -109.8100       7.5        32       116        60
OIR    2025250     91400   20.6700 -109.8200       7.5        32       115        60
OIR    2025250     91400   20.6700 -109.8300       7.4        32       115        60
OIR    2025250     91400   20.6700 -109.8400       7.3        32       116        60
OIR    2025250     91400   20.6700 -109.8500       7.0        32       116        60
OIR    2025250     91400   20.6700 -109.8600       6.5        33       117        60
OIR    2025250     91400   20.6700 -109.8700       6.0        34       119        60
OIR    2025250     91400   20.6700 -109.8800       5.8        35       120        60
OIR    2025250     91400   20.6700 -109.8900       5.7        35       120        60
OIR    2025250     91400   20.6700 -109.9000       5.5        36       120        60
OIR    2025250     91400   20.6700 -109.9100       5.5        37       117        60
OIR    2025250     91400   20.6700 -109.9200       5.3        38       116        60
OIR    2025250     91400   20.6700 -109.9300       5.2        39       115        60
OIR    2025250     91400   20.6700 -109.9400       5.1        41       115        60
OIR    2025250     91400   20.6700 -109.9500       5.0        43       116        60
OIR    2025250     91400   20.6700 -109.9600       5.0        47       116        60
OIR    2025250     91400   20.6700 -109.9700       4.9        50       117        60
OIR    2025250     91400   20.6700 -109.9800       4.4        59       122        60
OIR    2025250     91400   20.6700 -109.9900       5.6       112       126        60
OIR    2025250     91400   20.6700 -110.0000       5.1       126       130        60
OIR    2025250     91400   20.6600 -108.8200      10.1        98       135        60
OIR    2025250     91400   20.6600 -109.2400       9.4        35       136        60
OIR    2025250     91400   20.6600 -109.2500       9.1        37       130        60
OIR    2025250     91400   20.6600 -109.2600       9.1        37       123        60
OIR    2025250     91400   20.6600 -109.2700       9.1        37       117        60
OIR    2025250     91400   20.6600 -109.2800       9.4        37       115        60
OIR    2025250     91400   20.6600 -109.2900       9.9        37       112        60
OIR    2025250     91400   20.6600 -109.3000      10.2        37       110        60
OIR    2025250     91400   20.6600 -109.3100       9.8        37       108        60
OIR    2025250     91400   20.6600 -109.3200       9.6        36       107        60
OIR    2025250     91400   20.6600 -109.3300       9.3        36       105        60
OIR    2025250     91400   20.6600 -109.3400       9.2        36       104        60
OIR    2025250     91400   20.6600 -109.3500       9.1        35       104        60
OIR    2025250     91400   20.6600 -109.3600       9.0        35       103        60
OIR    2025250     91400   20.6600 -109.3700       9.0        35       103        60
OIR    2025250     91400   20.6600 -109.3800       9.0        35       103        60
OIR    2025250     91400   20.6600 -109.3900       9.0        35       103        60
OIR    2025250     91400   20.6600 -109.4000       8.9        35       103        60
OIR    2025250     91400   20.6600 -109.4100       8.9        35       103        60
OIR    2025250     91400   20.6600 -109.4200       8.9        34       103        60
OIR    2025250     91400   20.6600 -109.4300       8.8        34       103        60
OIR    2025250     91400   20.6600 -109.4400       8.8        34       103        60
OIR    2025250     91400   20.6600 -109.4500       8.7        34       103        60
OIR    2025250     91400   20.6600 -109.4600       8.6        34       103        60
OIR    2025250     91400   20.6600 -109.4700       8.6        34       103        60
OIR    2025250     91400   20.6600 -109.4800       8.5        34       103        60
OIR    2025250     91400   20.6600 -109.4900       8.5        33       103        60
OIR    2025250     91400   20.6600 -109.5000       8.4        33       103        60
OIR    2025250     91400   20.6600 -109.5100       8.4        33       103        60
OIR    2025250     91400   20.6600 -109.5200       8.4        33       103        60
OIR    2025250     91400   20.6600 -109.5300       8.4        33       103        60
OIR    2025250     91400   20.6600 -109.5400       8.4        33       103        60
OIR    2025250     91400   20.6600 -109.5500       8.3        33       103        60
OIR    2025250     91400   20.6600 -109.5600       8.3        32       103        60
OIR    2025250     91400   20.6600 -109.5700       8.3        32       103        60
OIR    2025250     91400   20.6600 -109.5800       8.3        32       103        60
OIR    2025250     91400   20.6600 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.6600 -109.6000       8.3        32       103        60
OIR    2025250     91400   20.6600 -109.6100       8.2        32       104        60
OIR    2025250     91400   20.6600 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.6600 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.6600 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.6600 -109.6500       8.2        32       103        60
OIR    2025250     91400   20.6600 -109.6600       8.2        32       103        60
OIR    2025250     91400   20.6600 -109.6700       8.2        32       103        60
OIR    2025250     91400   20.6600 -109.6800       8.1        32       103        60
OIR    2025250     91400   20.6600 -109.6900       8.1        32       103        60
OIR    2025250     91400   20.6600 -109.7000       8.1        32       103        60
OIR    2025250     91400   20.6600 -109.7100       8.1        32       103        60
OIR    2025250     91400   20.6600 -109.7200       8.0        32       103        60
OIR    2025250     91400   20.6600 -109.7300       8.0        32       103        60
OIR    2025250     91400   20.6600 -109.7400       7.9        32       104        60
OIR    2025250     91400   20.6600 -109.7500       7.8        32       105        60
OIR    2025250     91400   20.6600 -109.7600       7.8        32       108        60
OIR    2025250     91400   20.6600 -109.7700       7.8        32       110        60
OIR    2025250     91400   20.6600 -109.7800       7.8        32       111        60
OIR    2025250     91400   20.6600 -109.7900       7.7        32       113        60
OIR    2025250     91400   20.6600 -109.8000       7.7        32       114        60
OIR    2025250     91400   20.6600 -109.8100       7.7        32       115        60
OIR    2025250     91400   20.6600 -109.8200       7.6        32       115        60
OIR    2025250     91400   20.6600 -109.8300       7.5        32       115        60
OIR    2025250     91400   20.6600 -109.8400       7.3        31       116        60
OIR    2025250     91400   20.6600 -109.8500       7.1        31       117        60
OIR    2025250     91400   20.6600 -109.8600       6.7        32       120        60
OIR    2025250     91400   20.6600 -109.8700       6.2        33       121        60
OIR    2025250     91400   20.6600 -109.8800       5.9        33       122        60
OIR    2025250     91400   20.6600 -109.8900       5.7        34       122        60
OIR    2025250     91400   20.6600 -109.9000       5.6        34       122        60
OIR    2025250     91400   20.6600 -109.9100       5.5        35       121        60
OIR    2025250     91400   20.6600 -109.9200       5.3        36       117        60
OIR    2025250     91400   20.6600 -109.9300       5.2        37       116        60
OIR    2025250     91400   20.6600 -109.9400       5.1        38       116        60
OIR    2025250     91400   20.6600 -109.9500       5.0        39       116        60
OIR    2025250     91400   20.6600 -109.9600       4.9        43       117        60
OIR    2025250     91400   20.6600 -109.9700       4.6        45       120        60
OIR    2025250     91400   20.6600 -109.9800       4.7        95       124        60
OIR    2025250     91400   20.6600 -109.9900       5.7       115       131        60
OIR    2025250     91400   20.6600 -110.0000       4.1       115       138        60
OIR    2025250     91400   20.6500 -109.2500       9.0        37       140        60
OIR    2025250     91400   20.6500 -109.2600       9.1        37       133        60
OIR    2025250     91400   20.6500 -109.2700       9.1        38       127        60
OIR    2025250     91400   20.6500 -109.2800       9.5        39       122        60
OIR    2025250     91400   20.6500 -109.2900      10.3        40       117        60
OIR    2025250     91400   20.6500 -109.3000      10.8        40       113        60
OIR    2025250     91400   20.6500 -109.3100      11.0        41       109        60
OIR    2025250     91400   20.6500 -109.3200      10.5        40       107        60
OIR    2025250     91400   20.6500 -109.3300       9.7        38       105        60
OIR    2025250     91400   20.6500 -109.3400       9.3        37       104        60
OIR    2025250     91400   20.6500 -109.3500       9.1        36       104        60
OIR    2025250     91400   20.6500 -109.3600       9.1        35       103        60
OIR    2025250     91400   20.6500 -109.3700       9.0        35       103        60
OIR    2025250     91400   20.6500 -109.3800       9.0        35       103        60
OIR    2025250     91400   20.6500 -109.3900       9.0        35       103        60
OIR    2025250     91400   20.6500 -109.4000       8.9        35       103        60
OIR    2025250     91400   20.6500 -109.4100       8.9        35       103        60
OIR    2025250     91400   20.6500 -109.4200       8.9        35       103        60
OIR    2025250     91400   20.6500 -109.4300       8.8        34       103        60
OIR    2025250     91400   20.6500 -109.4400       8.7        34       103        60
OIR    2025250     91400   20.6500 -109.4500       8.7        34       103        60
OIR    2025250     91400   20.6500 -109.4600       8.6        34       103        60
OIR    2025250     91400   20.6500 -109.4700       8.5        34       103        60
OIR    2025250     91400   20.6500 -109.4800       8.5        34       103        60
OIR    2025250     91400   20.6500 -109.4900       8.4        34       103        60
OIR    2025250     91400   20.6500 -109.5000       8.4        33       103        60
OIR    2025250     91400   20.6500 -109.5100       8.4        33       103        60
OIR    2025250     91400   20.6500 -109.5200       8.4        33       103        60
OIR    2025250     91400   20.6500 -109.5300       8.3        33       103        60
OIR    2025250     91400   20.6500 -109.5400       8.3        33       103        60
OIR    2025250     91400   20.6500 -109.5500       8.3        33       103        60
OIR    2025250     91400   20.6500 -109.5600       8.3        33       103        60
OIR    2025250     91400   20.6500 -109.5700       8.3        32       103        60
OIR    2025250     91400   20.6500 -109.5800       8.3        32       103        60
OIR    2025250     91400   20.6500 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.6500 -109.6000       8.3        32       103        60
OIR    2025250     91400   20.6500 -109.6100       8.2        32       103        60
OIR    2025250     91400   20.6500 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.6500 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.6500 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.6500 -109.6500       8.2        32       103        60
OIR    2025250     91400   20.6500 -109.6600       8.2        32       103        60
OIR    2025250     91400   20.6500 -109.6700       8.2        32       103        60
OIR    2025250     91400   20.6500 -109.6800       8.2        32       103        60
OIR    2025250     91400   20.6500 -109.6900       8.1        32       103        60
OIR    2025250     91400   20.6500 -109.7000       8.1        32       103        60
OIR    2025250     91400   20.6500 -109.7100       8.1        32       103        60
OIR    2025250     91400   20.6500 -109.7200       8.1        32       103        60
OIR    2025250     91400   20.6500 -109.7300       8.0        32       104        60
OIR    2025250     91400   20.6500 -109.7400       8.0        32       104        60
OIR    2025250     91400   20.6500 -109.7500       7.9        32       104        60
OIR    2025250     91400   20.6500 -109.7600       7.8        32       104        60
OIR    2025250     91400   20.6500 -109.7700       7.8        32       104        60
OIR    2025250     91400   20.6500 -109.7800       7.8        32       105        60
OIR    2025250     91400   20.6500 -109.7900       7.8        32       107        60
OIR    2025250     91400   20.6500 -109.8000       7.8        32       109        60
OIR    2025250     91400   20.6500 -109.8100       7.7        31       110        60
OIR    2025250     91400   20.6500 -109.8200       7.7        31       112        60
OIR    2025250     91400   20.6500 -109.8300       7.6        31       114        60
OIR    2025250     91400   20.6500 -109.8400       7.4        31       116        60
OIR    2025250     91400   20.6500 -109.8500       7.1        30       116        60
OIR    2025250     91400   20.6500 -109.8600       6.8        30       119        60
OIR    2025250     91400   20.6500 -109.8700       6.4        31       120        60
OIR    2025250     91400   20.6500 -109.8800       6.1        30       120        60
OIR    2025250     91400   20.6500 -109.8900       5.8        31       120        60
OIR    2025250     91400   20.6500 -109.9000       5.7        32       120        60
OIR    2025250     91400   20.6500 -109.9100       5.5        33       120        60
OIR    2025250     91400   20.6500 -109.9200       5.4        33       117        60
OIR    2025250     91400   20.6500 -109.9300       5.2        34       116        60
OIR    2025250     91400   20.6500 -109.9400       5.1        35       116        60
OIR    2025250     91400   20.6500 -109.9500       5.0        36       117        60
OIR    2025250     91400   20.6500 -109.9600       4.8        40       119        60
OIR    2025250     91400   20.6500 -109.9700       4.2        49       121        60
OIR    2025250     91400   20.6500 -109.9800       5.8       117       124        60
OIR    2025250     91400   20.6500 -109.9900       6.4       121       135        60
OIR    2025250     91400   20.6400 -109.2700      10.0        38       136        60
OIR    2025250     91400   20.6400 -109.2800      10.1        42       130        60
OIR    2025250     91400   20.6400 -109.2900      10.5        42       124        60
OIR    2025250     91400   20.6400 -109.3000      10.9        42       117        60
OIR    2025250     91400   20.6400 -109.3100      11.2        43       111        60
OIR    2025250     91400   20.6400 -109.3200      11.0        43       107        60
OIR    2025250     91400   20.6400 -109.3300      10.1        41       105        60
OIR    2025250     91400   20.6400 -109.3400       9.5        39       104        60
OIR    2025250     91400   20.6400 -109.3500       9.3        38       104        60
OIR    2025250     91400   20.6400 -109.3600       9.2        37       104        60
OIR    2025250     91400   20.6400 -109.3700       9.1        36       103        60
OIR    2025250     91400   20.6400 -109.3800       9.0        35       103        60
OIR    2025250     91400   20.6400 -109.3900       9.0        35       103        60
OIR    2025250     91400   20.6400 -109.4000       8.9        35       103        60
OIR    2025250     91400   20.6400 -109.4100       8.9        35       103        60
OIR    2025250     91400   20.6400 -109.4200       8.9        35       103        60
OIR    2025250     91400   20.6400 -109.4300       8.8        35       103        60
OIR    2025250     91400   20.6400 -109.4400       8.7        34       103        60
OIR    2025250     91400   20.6400 -109.4500       8.6        34       103        60
OIR    2025250     91400   20.6400 -109.4600       8.6        34       103        60
OIR    2025250     91400   20.6400 -109.4700       8.5        34       103        60
OIR    2025250     91400   20.6400 -109.4800       8.4        34       103        60
OIR    2025250     91400   20.6400 -109.4900       8.4        34       103        60
OIR    2025250     91400   20.6400 -109.5000       8.4        33       103        60
OIR    2025250     91400   20.6400 -109.5100       8.4        33       103        60
OIR    2025250     91400   20.6400 -109.5200       8.3        33       103        60
OIR    2025250     91400   20.6400 -109.5300       8.3        33       103        60
OIR    2025250     91400   20.6400 -109.5400       8.3        33       103        60
OIR    2025250     91400   20.6400 -109.5500       8.3        33       103        60
OIR    2025250     91400   20.6400 -109.5600       8.3        33       103        60
OIR    2025250     91400   20.6400 -109.5700       8.3        33       103        60
OIR    2025250     91400   20.6400 -109.5800       8.3        32       103        60
OIR    2025250     91400   20.6400 -109.5900       8.3        32       103        60
OIR    2025250     91400   20.6400 -109.6000       8.2        32       103        60
OIR    2025250     91400   20.6400 -109.6100       8.2        32       103        60
OIR    2025250     91400   20.6400 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.6400 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.6400 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.6400 -109.6500       8.2        32       103        60
OIR    2025250     91400   20.6400 -109.6600       8.2        32       103        60
OIR    2025250     91400   20.6400 -109.6700       8.2        32       103        60
OIR    2025250     91400   20.6400 -109.6800       8.2        32       103        60
OIR    2025250     91400   20.6400 -109.6900       8.2        32       103        60
OIR    2025250     91400   20.6400 -109.7000       8.1        32       103        60
OIR    2025250     91400   20.6400 -109.7100       8.1        32       103        60
OIR    2025250     91400   20.6400 -109.7200       8.1        32       103        60
OIR    2025250     91400   20.6400 -109.7300       8.1        32       104        60
OIR    2025250     91400   20.6400 -109.7400       8.0        32       104        60
OIR    2025250     91400   20.6400 -109.7500       8.0        32       104        60
OIR    2025250     91400   20.6400 -109.7600       7.9        32       104        60
OIR    2025250     91400   20.6400 -109.7700       7.9        32       104        60
OIR    2025250     91400   20.6400 -109.7800       7.8        32       104        60
OIR    2025250     91400   20.6400 -109.7900       7.8        32       104        60
OIR    2025250     91400   20.6400 -109.8000       7.8        31       105        60
OIR    2025250     91400   20.6400 -109.8100       7.8        31       107        60
OIR    2025250     91400   20.6400 -109.8200       7.7        31       110        60
OIR    2025250     91400   20.6400 -109.8300       7.7        30       113        60
OIR    2025250     91400   20.6400 -109.8400       7.5        30       115        60
OIR    2025250     91400   20.6400 -109.8500       7.2        29       116        60
OIR    2025250     91400   20.6400 -109.8600       6.9        28       116        60
OIR    2025250     91400   20.6400 -109.8700       6.6        28       117        60
OIR    2025250     91400   20.6400 -109.8800       6.3        28       119        60
OIR    2025250     91400   20.6400 -109.8900       6.0        28       119        60
OIR    2025250     91400   20.6400 -109.9000       5.7        29       119        60
OIR    2025250     91400   20.6400 -109.9100       5.5        30       117        60
OIR    2025250     91400   20.6400 -109.9200       5.4        31       117        60
OIR    2025250     91400   20.6400 -109.9300       5.2        32       116        60
OIR    2025250     91400   20.6400 -109.9400       5.1        32       116        60
OIR    2025250     91400   20.6400 -109.9500       5.1        34       117        60
OIR    2025250     91400   20.6400 -109.9600       5.1        37       119        60
OIR    2025250     91400   20.6400 -109.9700       5.0        63       121        60
OIR    2025250     91400   20.6400 -109.9800       6.2       122       123        60
OIR    2025250     91400   20.6400 -109.9900       6.2       122       136        60
OIR    2025250     91400   20.6300 -109.2800      10.6        43       138        60
OIR    2025250     91400   20.6300 -109.2900      10.9        43       130        60
OIR    2025250     91400   20.6300 -109.3000      11.0        44       123        60
OIR    2025250     91400   20.6300 -109.3100      11.2        45       115        60
OIR    2025250     91400   20.6300 -109.3200      11.1        46       107        60
OIR    2025250     91400   20.6300 -109.3300      10.2        45       105        60
OIR    2025250     91400   20.6300 -109.3400       9.6        41       105        60
OIR    2025250     91400   20.6300 -109.3500       9.5        39       104        60
OIR    2025250     91400   20.6300 -109.3600       9.4        38       104        60
OIR    2025250     91400   20.6300 -109.3700       9.3        37       104        60
OIR    2025250     91400   20.6300 -109.3800       9.2        36       104        60
OIR    2025250     91400   20.6300 -109.3900       9.0        35       103        60
OIR    2025250     91400   20.6300 -109.4000       9.0        35       103        60
OIR    2025250     91400   20.6300 -109.4100       8.9        35       103        60
OIR    2025250     91400   20.6300 -109.4200       8.8        35       104        60
OIR    2025250     91400   20.6300 -109.4300       8.8        35       103        60
OIR    2025250     91400   20.6300 -109.4400       8.7        35       103        60
OIR    2025250     91400   20.6300 -109.4500       8.6        34       103        60
OIR    2025250     91400   20.6300 -109.4600       8.5        34       103        60
OIR    2025250     91400   20.6300 -109.4700       8.5        34       103        60
OIR    2025250     91400   20.6300 -109.4800       8.4        34       104        60
OIR    2025250     91400   20.6300 -109.4900       8.4        34       104        60
OIR    2025250     91400   20.6300 -109.5000       8.3        33       104        60
OIR    2025250     91400   20.6300 -109.5100       8.3        33       103        60
OIR    2025250     91400   20.6300 -109.5200       8.3        33       103        60
OIR    2025250     91400   20.6300 -109.5300       8.3        33       103        60
OIR    2025250     91400   20.6300 -109.5400       8.3        33       103        60
OIR    2025250     91400   20.6300 -109.5500       8.3        33       103        60
OIR    2025250     91400   20.6300 -109.5600       8.3        33       103        60
OIR    2025250     91400   20.6300 -109.5700       8.3        33       103        60
OIR    2025250     91400   20.6300 -109.5800       8.3        33       103        60
OIR    2025250     91400   20.6300 -109.5900       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.6000       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.6100       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.6500       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.6600       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.6700       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.6800       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.6900       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.7000       8.2        32       103        60
OIR    2025250     91400   20.6300 -109.7100       8.1        32       103        60
OIR    2025250     91400   20.6300 -109.7200       8.1        32       103        60
OIR    2025250     91400   20.6300 -109.7300       8.1        32       103        60
OIR    2025250     91400   20.6300 -109.7400       8.1        32       103        60
OIR    2025250     91400   20.6300 -109.7500       8.0        32       103        60
OIR    2025250     91400   20.6300 -109.7600       8.0        32       103        60
OIR    2025250     91400   20.6300 -109.7700       7.9        32       103        60
OIR    2025250     91400   20.6300 -109.7800       7.9        32       103        60
OIR    2025250     91400   20.6300 -109.7900       7.9        32       104        60
OIR    2025250     91400   20.6300 -109.8000       7.8        31       104        60
OIR    2025250     91400   20.6300 -109.8100       7.8        31       107        60
OIR    2025250     91400   20.6300 -109.8200       7.8        30       108        60
OIR    2025250     91400   20.6300 -109.8300       7.7        30       111        60
OIR    2025250     91400   20.6300 -109.8400       7.5        28       113        60
OIR    2025250     91400   20.6300 -109.8500       7.3        27       114        60
OIR    2025250     91400   20.6300 -109.8600       7.0        26       116        60
OIR    2025250     91400   20.6300 -109.8700       6.7        25       116        60
OIR    2025250     91400   20.6300 -109.8800       6.3        26       117        60
OIR    2025250     91400   20.6300 -109.8900       6.0        26       117        60
OIR    2025250     91400   20.6300 -109.9000       5.7        27       117        60
OIR    2025250     91400   20.6300 -109.9100       5.5        28       117        60
OIR    2025250     91400   20.6300 -109.9200       5.3        28       117        60
OIR    2025250     91400   20.6300 -109.9300       5.1        29       116        60
OIR    2025250     91400   20.6300 -109.9400       5.0        30       116        60
OIR    2025250     91400   20.6300 -109.9500       5.0        31       117        60
OIR    2025250     91400   20.6300 -109.9600       5.1        33       119        60
OIR    2025250     91400   20.6300 -109.9700       5.7        54       123        60
OIR    2025250     91400   20.6300 -109.9800       5.2        74       128        60
OIR    2025250     91400   20.6300 -109.9900       6.3       115       140        60
OIR    2025250     91400   20.6200 -109.2900      11.0        44       138        60
OIR    2025250     91400   20.6200 -109.3000      11.2        45       129        60
OIR    2025250     91400   20.6200 -109.3100      11.2        47       120        60
OIR    2025250     91400   20.6200 -109.3200      10.3        52       111        60
OIR    2025250     91400   20.6200 -109.3300       9.4        52       108        60
OIR    2025250     91400   20.6200 -109.3400       9.2        46       107        60
OIR    2025250     91400   20.6200 -109.3500       9.7        42       105        60
OIR    2025250     91400   20.6200 -109.3600       9.9        40       104        60
OIR    2025250     91400   20.6200 -109.3700       9.8        39       104        60
OIR    2025250     91400   20.6200 -109.3800       9.6        38       104        60
OIR    2025250     91400   20.6200 -109.3900       9.3        37       104        60
OIR    2025250     91400   20.6200 -109.4000       9.0        36       103        60
OIR    2025250     91400   20.6200 -109.4100       8.9        35       104        60
OIR    2025250     91400   20.6200 -109.4200       8.8        35       104        60
OIR    2025250     91400   20.6200 -109.4300       8.8        35       104        60
OIR    2025250     91400   20.6200 -109.4400       8.7        35       103        60
OIR    2025250     91400   20.6200 -109.4500       8.6        35       103        60
OIR    2025250     91400   20.6200 -109.4600       8.5        34       103        60
OIR    2025250     91400   20.6200 -109.4700       8.4        34       103        60
OIR    2025250     91400   20.6200 -109.4800       8.4        34       104        60
OIR    2025250     91400   20.6200 -109.4900       8.4        34       105        60
OIR    2025250     91400   20.6200 -109.5000       8.3        34       105        60
OIR    2025250     91400   20.6200 -109.5100       8.3        33       104        60
OIR    2025250     91400   20.6200 -109.5200       8.3        33       103        60
OIR    2025250     91400   20.6200 -109.5300       8.3        33       103        60
OIR    2025250     91400   20.6200 -109.5400       8.3        33       103        60
OIR    2025250     91400   20.6200 -109.5500       8.3        33       103        60
OIR    2025250     91400   20.6200 -109.5600       8.3        33       103        60
OIR    2025250     91400   20.6200 -109.5700       8.3        33       103        60
OIR    2025250     91400   20.6200 -109.5800       8.2        33       103        60
OIR    2025250     91400   20.6200 -109.5900       8.2        32       103        60
OIR    2025250     91400   20.6200 -109.6000       8.2        32       103        60
OIR    2025250     91400   20.6200 -109.6100       8.2        32       103        60
OIR    2025250     91400   20.6200 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.6200 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.6200 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.6200 -109.6500       8.2        32       104        60
OIR    2025250     91400   20.6200 -109.6600       8.2        32       104        60
OIR    2025250     91400   20.6200 -109.6700       8.2        32       104        60
OIR    2025250     91400   20.6200 -109.6800       8.2        32       104        60
OIR    2025250     91400   20.6200 -109.6900       8.2        32       103        60
OIR    2025250     91400   20.6200 -109.7000       8.2        32       103        60
OIR    2025250     91400   20.6200 -109.7100       8.2        32       103        60
OIR    2025250     91400   20.6200 -109.7200       8.1        32       103        60
OIR    2025250     91400   20.6200 -109.7300       8.1        32       103        60
OIR    2025250     91400   20.6200 -109.7400       8.1        32       103        60
OIR    2025250     91400   20.6200 -109.7500       8.1        32       103        60
OIR    2025250     91400   20.6200 -109.7600       8.0        32       103        60
OIR    2025250     91400   20.6200 -109.7700       8.0        32       104        60
OIR    2025250     91400   20.6200 -109.7800       7.9        32       103        60
OIR    2025250     91400   20.6200 -109.7900       7.9        32       103        60
OIR    2025250     91400   20.6200 -109.8000       7.9        31       104        60
OIR    2025250     91400   20.6200 -109.8100       7.9        31       105        60
OIR    2025250     91400   20.6200 -109.8200       7.8        30       108        60
OIR    2025250     91400   20.6200 -109.8300       7.7        30       110        60
OIR    2025250     91400   20.6200 -109.8400       7.5        27       111        60
OIR    2025250     91400   20.6200 -109.8500       7.3        25       113        60
OIR    2025250     91400   20.6200 -109.8600       7.0        24       115        60
OIR    2025250     91400   20.6200 -109.8700       6.7        23       116        60
OIR    2025250     91400   20.6200 -109.8800       6.4        23       116        60
OIR    2025250     91400   20.6200 -109.8900       6.0        24       116        60
OIR    2025250     91400   20.6200 -109.9000       5.7        24       116        60
OIR    2025250     91400   20.6200 -109.9100       5.4        24       116        60
OIR    2025250     91400   20.6200 -109.9200       5.2        24       116        60
OIR    2025250     91400   20.6200 -109.9300       5.0        24       116        60
OIR    2025250     91400   20.6200 -109.9400       4.8        24       116        60
OIR    2025250     91400   20.6200 -109.9500       4.6        24       117        60
OIR    2025250     91400   20.6200 -109.9600       4.9        30       120        60
OIR    2025250     91400   20.6200 -109.9700       5.5        36       124        60
OIR    2025250     91400   20.6200 -109.9800       5.6        30       132        60
OIR    2025250     91400   20.6200 -116.1600      26.1       186       134        60
OIR    2025250     91400   20.6200 -116.1700      27.3       182       138        60
OIR    2025250     91400   20.6100 -109.3000      11.1        47       138        60
OIR    2025250     91400   20.6100 -109.3100      10.5        53       129        60
OIR    2025250     91400   20.6100 -109.3200       9.4        60       120        60
OIR    2025250     91400   20.6100 -109.3300       8.9        61       114        60
OIR    2025250     91400   20.6100 -109.3400       8.8        57       111        60
OIR    2025250     91400   20.6100 -109.3500       9.7        50       109        60
OIR    2025250     91400   20.6100 -109.3600      10.7        44       107        60
OIR    2025250     91400   20.6100 -109.3700      10.7        42       105        60
OIR    2025250     91400   20.6100 -109.3800      10.2        41       104        60
OIR    2025250     91400   20.6100 -109.3900       9.7        39       105        60
OIR    2025250     91400   20.6100 -109.4000       9.3        37       105        60
OIR    2025250     91400   20.6100 -109.4100       9.0        36       105        60
OIR    2025250     91400   20.6100 -109.4200       8.9        35       105        60
OIR    2025250     91400   20.6100 -109.4300       8.8        35       105        60
OIR    2025250     91400   20.6100 -109.4400       8.7        35       104        60
OIR    2025250     91400   20.6100 -109.4500       8.5        35       104        60
OIR    2025250     91400   20.6100 -109.4600       8.5        35       104        60
OIR    2025250     91400   20.6100 -109.4700       8.4        34       104        60
OIR    2025250     91400   20.6100 -109.4800       8.4        34       104        60
OIR    2025250     91400   20.6100 -109.4900       8.3        34       107        60
OIR    2025250     91400   20.6100 -109.5000       8.3        34       108        60
OIR    2025250     91400   20.6100 -109.5100       8.3        33       105        60
OIR    2025250     91400   20.6100 -109.5200       8.3        33       104        60
OIR    2025250     91400   20.6100 -109.5300       8.3        33       103        60
OIR    2025250     91400   20.6100 -109.5400       8.2        33       103        60
OIR    2025250     91400   20.6100 -109.5500       8.2        33       103        60
OIR    2025250     91400   20.6100 -109.5600       8.2        33       103        60
OIR    2025250     91400   20.6100 -109.5700       8.2        33       103        60
OIR    2025250     91400   20.6100 -109.5800       8.2        33       103        60
OIR    2025250     91400   20.6100 -109.5900       8.2        33       103        60
OIR    2025250     91400   20.6100 -109.6000       8.2        32       103        60
OIR    2025250     91400   20.6100 -109.6100       8.2        32       103        60
OIR    2025250     91400   20.6100 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.6100 -109.6300       8.2        32       103        60
OIR    2025250     91400   20.6100 -109.6400       8.2        32       103        60
OIR    2025250     91400   20.6100 -109.6500       8.2        32       104        60
OIR    2025250     91400   20.6100 -109.6600       8.2        32       104        60
OIR    2025250     91400   20.6100 -109.6700       8.2        32       107        60
OIR    2025250     91400   20.6100 -109.6800       8.2        32       105        60
OIR    2025250     91400   20.6100 -109.6900       8.2        32       104        60
OIR    2025250     91400   20.6100 -109.7000       8.2        32       103        60
OIR    2025250     91400   20.6100 -109.7100       8.2        32       103        60
OIR    2025250     91400   20.6100 -109.7200       8.1        32       103        60
OIR    2025250     91400   20.6100 -109.7300       8.1        32       103        60
OIR    2025250     91400   20.6100 -109.7400       8.1        32       103        60
OIR    2025250     91400   20.6100 -109.7500       8.1        32       103        60
OIR    2025250     91400   20.6100 -109.7600       8.1        32       104        60
OIR    2025250     91400   20.6100 -109.7700       8.1        32       104        60
OIR    2025250     91400   20.6100 -109.7800       8.0        32       104        60
OIR    2025250     91400   20.6100 -109.7900       8.0        31       103        60
OIR    2025250     91400   20.6100 -109.8000       8.0        31       104        60
OIR    2025250     91400   20.6100 -109.8100       7.9        30       107        60
OIR    2025250     91400   20.6100 -109.8200       7.9        30       109        60
OIR    2025250     91400   20.6100 -109.8300       7.7        28       111        60
OIR    2025250     91400   20.6100 -109.8400       7.5        25       113        60
OIR    2025250     91400   20.6100 -109.8500       7.3        23       114        60
OIR    2025250     91400   20.6100 -109.8600       7.0        22       115        60
OIR    2025250     91400   20.6100 -109.8700       6.8        21       116        60
OIR    2025250     91400   20.6100 -109.8800       6.4        21       116        60
OIR    2025250     91400   20.6100 -109.8900       6.0        21       116        60
OIR    2025250     91400   20.6100 -109.9000       5.6        21       116        60
OIR    2025250     91400   20.6100 -109.9100       5.2        20       116        60
OIR    2025250     91400   20.6100 -109.9200       5.0        21       116        60
OIR    2025250     91400   20.6100 -109.9300       4.7        21       116        60
OIR    2025250     91400   20.6100 -109.9400       4.5        22       117        60
OIR    2025250     91400   20.6100 -109.9500       4.2        22       120        60
OIR    2025250     91400   20.6100 -109.9600       4.3        29       122        60
OIR    2025250     91400   20.6100 -109.9700       5.3        35       126        60
OIR    2025250     91400   20.6100 -109.9800       5.4        33       136        60
OIR    2025250     91400   20.6100 -116.1400      17.2       143       137        60
OIR    2025250     91400   20.6100 -116.1500      13.3       173       132        60
OIR    2025250     91400   20.6100 -116.1600      17.9       173       128        60
OIR    2025250     91400   20.6100 -116.1700      18.8       181       133        60
OIR    2025250     91400   20.6100 -116.1800      16.5       188       137        60
OIR    2025250     91400   20.6000 -109.3100      10.1        55       139        60
OIR    2025250     91400   20.6000 -109.3200       9.6        59       129        60
OIR    2025250     91400   20.6000 -109.3300       9.7        58       120        60
OIR    2025250     91400   20.6000 -109.3400       9.9        58       116        60
OIR    2025250     91400   20.6000 -109.3500      10.2        55       112        60
OIR    2025250     91400   20.6000 -109.3600      11.2        49       109        60
OIR    2025250     91400   20.6000 -109.3700      11.2        45       108        60
OIR    2025250     91400   20.6000 -109.3800      10.7        43       107        60
OIR    2025250     91400   20.6000 -109.3900      10.3        41       108        60
OIR    2025250     91400   20.6000 -109.4000       9.7        38       109        60
OIR    2025250     91400   20.6000 -109.4100       9.2        37       109        60
OIR    2025250     91400   20.6000 -109.4200       8.9        36       109        60
OIR    2025250     91400   20.6000 -109.4300       8.8        36       109        60
OIR    2025250     91400   20.6000 -109.4400       8.6        35       107        60
OIR    2025250     91400   20.6000 -109.4500       8.5        35       104        60
OIR    2025250     91400   20.6000 -109.4600       8.4        35       104        60
OIR    2025250     91400   20.6000 -109.4700       8.4        34       104        60
OIR    2025250     91400   20.6000 -109.4800       8.3        34       104        60
OIR    2025250     91400   20.6000 -109.4900       8.3        34       107        60
OIR    2025250     91400   20.6000 -109.5000       8.3        34       109        60
OIR    2025250     91400   20.6000 -109.5100       8.3        33       107        60
OIR    2025250     91400   20.6000 -109.5200       8.2        33       104        60
OIR    2025250     91400   20.6000 -109.5300       8.2        33       104        60
OIR    2025250     91400   20.6000 -109.5400       8.2        33       104        60
OIR    2025250     91400   20.6000 -109.5500       8.2        33       104        60
OIR    2025250     91400   20.6000 -109.5600       8.2        33       104        60
OIR    2025250     91400   20.6000 -109.5700       8.2        33       103        60
OIR    2025250     91400   20.6000 -109.5800       8.2        33       103        60
OIR    2025250     91400   20.6000 -109.5900       8.2        33       103        60
OIR    2025250     91400   20.6000 -109.6000       8.2        32       103        60
OIR    2025250     91400   20.6000 -109.6100       8.2        32       103        60
OIR    2025250     91400   20.6000 -109.6200       8.2        32       103        60
OIR    2025250     91400   20.6000 -109.6300       8.2        32       104        60
OIR    2025250     91400   20.6000 -109.6400       8.2        32       104        60
OIR    2025250     91400   20.6000 -109.6500       8.2        32       104        60
OIR    2025250     91400   20.6000 -109.6600       8.2        32       105        60
OIR    2025250     91400   20.6000 -109.6700       8.3        32       107        60
OIR    2025250     91400   20.6000 -109.6800       8.3        32       108        60
OIR    2025250     91400   20.6000 -109.6900       8.3        32       104        60
OIR    2025250     91400   20.6000 -109.7000       8.4        32       103        60
OIR    2025250     91400   20.6000 -109.7100       8.4        32       103        60
OIR    2025250     91400   20.6000 -109.7200       8.3        32       103        60
OIR    2025250     91400   20.6000 -109.7300       8.2        33       103        60
OIR    2025250     91400   20.6000 -109.7400       8.2        32       103        60
OIR    2025250     91400   20.6000 -109.7500       8.2        32       103        60
OIR    2025250     91400   20.6000 -109.7600       8.2        32       104        60
OIR    2025250     91400   20.6000 -109.7700       8.1        32       104        60
OIR    2025250     91400   20.6000 -109.7800       8.1        32       104        60
OIR    2025250     91400   20.6000 -109.7900       8.1        31       104        60
OIR    2025250     91400   20.6000 -109.8000       8.1        31       104        60
OIR    2025250     91400   20.6000 -109.8100       8.0        30       107        60
OIR    2025250     91400   20.6000 -109.8200       7.9        29       109        60
OIR    2025250     91400   20.6000 -109.8300       7.8        27       112        60
OIR    2025250     91400   20.6000 -109.8400       7.5        23       114        60
OIR    2025250     91400   20.6000 -109.8500       7.3        20       115        60
OIR    2025250     91400   20.6000 -109.8600       7.1        18       115        60
OIR    2025250     91400   20.6000 -109.8700       6.8        17       116        60
OIR    2025250     91400   20.6000 -109.8800       6.4        17       115        60
OIR    2025250     91400   20.6000 -109.8900       5.9        17       115        60
OIR    2025250     91400   20.6000 -109.9000       5.4        16       115        60
OIR    2025250     91400   20.6000 -109.9100       4.9        16       115        60
OIR    2025250     91400   20.6000 -109.9200       4.5        17       115        60
OIR    2025250     91400   20.6000 -109.9300       4.1        20       116        60
OIR    2025250     91400   20.6000 -109.9700       4.6        30       128        60
OIR    2025250     91400   20.6000 -109.9800       9.2        40       140        60
OIR    2025250     91400   20.6000 -116.1500      12.4       171       120        60
OIR    2025250     91400   20.6000 -116.1600      13.5       175       124        60
OIR    2025250     91400   20.6000 -116.1700      13.7       183       129        60
OIR    2025250     91400   20.6000 -116.1800      12.3       192       133        60
OIR    2025250     91400   20.6000 -116.1900      11.6       195       139        60
OIR    2025250     91400   20.5900 -109.3300      10.4        59       134        60
OIR    2025250     91400   20.5900 -109.3400      11.3        56       127        60
OIR    2025250     91400   20.5900 -109.3500      11.7        53       120        60
OIR    2025250     91400   20.5900 -109.3600      11.6        50       115        60
OIR    2025250     91400   20.5900 -109.3700      11.6        48       111        60
OIR    2025250     91400   20.5900 -109.3800      11.0        44       109        60
OIR    2025250     91400   20.5900 -109.3900      10.8        42       109        60
OIR    2025250     91400   20.5900 -109.4000      10.2        40       110        60
OIR    2025250     91400   20.5900 -109.4100       9.4        38       110        60
OIR    2025250     91400   20.5900 -109.4200       9.1        37       110        60
OIR    2025250     91400   20.5900 -109.4300       8.8        36       109        60
OIR    2025250     91400   20.5900 -109.4400       8.6        36       108        60
OIR    2025250     91400   20.5900 -109.4500       8.4        35       107        60
OIR    2025250     91400   20.5900 -109.4600       8.4        35       105        60
OIR    2025250     91400   20.5900 -109.4700       8.3        35       105        60
OIR    2025250     91400   20.5900 -109.4800       8.3        34       105        60
OIR    2025250     91400   20.5900 -109.4900       8.3        34       108        60
OIR    2025250     91400   20.5900 -109.5000       8.2        34       109        60
OIR    2025250     91400   20.5900 -109.5100       8.2        34       109        60
OIR    2025250     91400   20.5900 -109.5200       8.2        33       105        60
OIR    2025250     91400   20.5900 -109.5300       8.2        33       104        60
OIR    2025250     91400   20.5900 -109.5400       8.2        33       104        60
OIR    2025250     91400   20.5900 -109.5500       8.2        33       104        60
OIR    2025250     91400   20.5900 -109.5600       8.2        33       104        60
OIR    2025250     91400   20.5900 -109.5700       8.2        33       104        60
OIR    2025250     91400   20.5900 -109.5800       8.2        33       104        60
OIR    2025250     91400   20.5900 -109.5900       8.2        33       103        60
OIR    2025250     91400   20.5900 -109.6000       8.2        32       103        60
OIR    2025250     91400   20.5900 -109.6100       8.2        32       103        60
OIR    2025250     91400   20.5900 -109.6200       8.2        32       104        60
OIR    2025250     91400   20.5900 -109.6300       8.2        32       104        60
OIR    2025250     91400   20.5900 -109.6400       8.2        32       104        60
OIR    2025250     91400   20.5900 -109.6500       8.2        32       104        60
OIR    2025250     91400   20.5900 -109.6600       8.3        32       107        60
OIR    2025250     91400   20.5900 -109.6700       8.4        32       108        60
OIR    2025250     91400   20.5900 -109.6800       8.5        33       109        60
OIR    2025250     91400   20.5900 -109.6900       8.6        33       107        60
OIR    2025250     91400   20.5900 -109.7000       8.8        32       104        60
OIR    2025250     91400   20.5900 -109.7100       9.0        32       103        60
OIR    2025250     91400   20.5900 -109.7200       9.1        32       103        60
OIR    2025250     91400   20.5900 -109.7300       9.1        32       103        60
OIR    2025250     91400   20.5900 -109.7400       9.0        32       103        60
OIR    2025250     91400   20.5900 -109.7500       8.9        32       103        60
OIR    2025250     91400   20.5900 -109.7600       8.8        32       103        60
OIR    2025250     91400   20.5900 -109.7700       8.8        31       104        60
OIR    2025250     91400   20.5900 -109.7800       8.7        30       104        60
OIR    2025250     91400   20.5900 -109.7900       8.6        30       104        60
OIR    2025250     91400   20.5900 -109.8000       8.4        30       105        60
OIR    2025250     91400   20.5900 -109.8100       8.2        30       109        60
OIR    2025250     91400   20.5900 -109.8200       8.1        28       111        60
OIR    2025250     91400   20.5900 -109.8300       7.9        25       113        60
OIR    2025250     91400   20.5900 -109.8400       7.7        20       114        60
OIR    2025250     91400   20.5900 -109.8500       7.5        16       115        60
OIR    2025250     91400   20.5900 -109.8600       7.3        13       115        60
OIR    2025250     91400   20.5900 -109.8700       7.0        12       115        60
OIR    2025250     91400   20.5900 -109.8800       6.5        11       115        60
OIR    2025250     91400   20.5900 -109.8900       5.8         9       114        60
OIR    2025250     91400   20.5900 -109.9000       5.2         9       114        60
OIR    2025250     91400   20.5900 -109.9100       4.5        12       116        60
OIR    2025250     91400   20.5900 -109.9800       8.1        47       141        60
OIR    2025250     91400   20.5900 -116.1500       4.3       156       133        60
OIR    2025250     91400   20.5900 -116.1600       6.9       172       128        60
OIR    2025250     91400   20.5900 -116.1700       7.8       186       130        60
OIR    2025250     91400   20.5900 -116.1800       9.8       195       137        60
OIR    2025250     91400   20.5800 -109.3400      11.4        54       138        60
OIR    2025250     91400   20.5800 -109.3500      11.7        53       129        60
OIR    2025250     91400   20.5800 -109.3600      11.7        51       121        60
OIR    2025250     91400   20.5800 -109.3700      11.5        50       116        60
OIR    2025250     91400   20.5800 -109.3800      11.1        43       112        60
OIR    2025250     91400   20.5800 -109.3900      11.0        42       111        60
OIR    2025250     91400   20.5800 -109.4000      10.7        41       110        60
OIR    2025250     91400   20.5800 -109.4100       9.6        40       109        60
OIR    2025250     91400   20.5800 -109.4200       9.1        39       109        60
OIR    2025250     91400   20.5800 -109.4300       8.7        38       109        60
OIR    2025250     91400   20.5800 -109.4400       8.4        37       109        60
OIR    2025250     91400   20.5800 -109.4500       8.3        36       108        60
OIR    2025250     91400   20.5800 -109.4600       8.3        35       107        60
OIR    2025250     91400   20.5800 -109.4700       8.2        35       107        60
OIR    2025250     91400   20.5800 -109.4800       8.2        34       107        60
OIR    2025250     91400   20.5800 -109.4900       8.2        34       108        60
OIR    2025250     91400   20.5800 -109.5000       8.2        34       109        60
OIR    2025250     91400   20.5800 -109.5100       8.2        34       109        60
OIR    2025250     91400   20.5800 -109.5200       8.2        33       107        60
OIR    2025250     91400   20.5800 -109.5300       8.1        33       104        60
OIR    2025250     91400   20.5800 -109.5400       8.1        33       104        60
OIR    2025250     91400   20.5800 -109.5500       8.0        33       104        60
OIR    2025250     91400   20.5800 -109.5600       8.1        33       104        60
OIR    2025250     91400   20.5800 -109.5700       8.1        33       104        60
OIR    2025250     91400   20.5800 -109.5800       8.1        33       104        60
OIR    2025250     91400   20.5800 -109.5900       8.2        33       104        60
OIR    2025250     91400   20.5800 -109.6000       8.2        32       104        60
OIR    2025250     91400   20.5800 -109.6100       8.2        32       104        60
OIR    2025250     91400   20.5800 -109.6200       8.2        32       104        60
OIR    2025250     91400   20.5800 -109.6300       8.2        32       105        60
OIR    2025250     91400   20.5800 -109.6400       8.2        32       107        60
OIR    2025250     91400   20.5800 -109.6500       8.3        32       108        60
OIR    2025250     91400   20.5800 -109.6600       8.4        33       109        60
OIR    2025250     91400   20.5800 -109.6700       8.6        33       109        60
OIR    2025250     91400   20.5800 -109.6800       8.9        33       110        60
OIR    2025250     91400   20.5800 -109.6900       9.4        33       108        60
OIR    2025250     91400   20.5800 -109.7000       9.8        33       105        60
OIR    2025250     91400   20.5800 -109.7100      10.6        31       104        60
OIR    2025250     91400   20.5800 -109.7200      11.5        30       104        60
OIR    2025250     91400   20.5800 -109.7300      11.9        30       104        60
OIR    2025250     91400   20.5800 -109.7400      11.8        30       104        60
OIR    2025250     91400   20.5800 -109.7500      11.3        30       104        60
OIR    2025250     91400   20.5800 -109.7600      10.6        30       104        60
OIR    2025250     91400   20.5800 -109.7700      10.2        29       104        60
OIR    2025250     91400   20.5800 -109.7800       9.9        29       104        60
OIR    2025250     91400   20.5800 -109.7900       9.7        29       105        60
OIR    2025250     91400   20.5800 -109.8000       9.3        29       108        60
OIR    2025250     91400   20.5800 -109.8100       9.0        28       111        60
OIR    2025250     91400   20.5800 -109.8200       8.6        27       113        60
OIR    2025250     91400   20.5800 -109.8300       8.4        23       114        60
OIR    2025250     91400   20.5800 -109.8400       8.0        16       115        60
OIR    2025250     91400   20.5800 -109.8500       7.8        10       116        60
OIR    2025250     91400   20.5800 -109.8600       7.6         7       115        60
OIR    2025250     91400   20.5800 -109.8700       7.3         6       114        60
OIR    2025250     91400   20.5800 -109.8800       6.7         3       114        60
OIR    2025250     91400   20.5800 -109.8900       5.9         1       113        60
OIR    2025250     91400   20.5800 -109.9000       5.2         2       113        60
OIR    2025250     91400   20.5800 -109.9100       4.3         7       116        60
OIR    2025250     91400   20.5800 -116.1600       4.9       179       136        60
OIR    2025250     91400   20.5800 -116.1700       6.6       195       130        60
OIR    2025250     91400   20.5800 -116.1800       8.6       200       139        60
OIR    2025250     91400   20.5700 -109.3500      11.4        52       140        60
OIR    2025250     91400   20.5700 -109.3600      11.6        51       131        60
OIR    2025250     91400   20.5700 -109.3700      11.3        51       125        60
OIR    2025250     91400   20.5700 -109.3800      10.9        45       119        60
OIR    2025250     91400   20.5700 -109.3900      11.1        43       116        60
OIR    2025250     91400   20.5700 -109.4000      10.8        41       115        60
OIR    2025250     91400   20.5700 -109.4100       9.0        42       113        60
OIR    2025250     91400   20.5700 -109.4200       8.5        43       112        60
OIR    2025250     91400   20.5700 -109.4300       7.7        47       111        60
OIR    2025250     91400   20.5700 -109.4400       7.0        48       110        60
OIR    2025250     91400   20.5700 -109.4500       7.7        40       110        60
OIR    2025250     91400   20.5700 -109.4600       7.9        36       109        60
OIR    2025250     91400   20.5700 -109.4700       8.0        35       109        60
OIR    2025250     91400   20.5700 -109.4800       8.1        35       109        60
OIR    2025250     91400   20.5700 -109.4900       8.2        34       109        60
OIR    2025250     91400   20.5700 -109.5000       8.2        34       109        60
OIR    2025250     91400   20.5700 -109.5100       8.2        34       110        60
OIR    2025250     91400   20.5700 -109.5200       8.1        33       108        60
OIR    2025250     91400   20.5700 -109.5300       8.0        33       105        60
OIR    2025250     91400   20.5700 -109.5400       7.7        32       104        60
OIR    2025250     91400   20.5700 -109.5500       7.5        31       104        60
OIR    2025250     91400   20.5700 -109.5600       7.5        32       104        60
OIR    2025250     91400   20.5700 -109.5700       7.6        32       104        60
OIR    2025250     91400   20.5700 -109.5800       7.8        33       105        60
OIR    2025250     91400   20.5700 -109.5900       8.0        33       105        60
OIR    2025250     91400   20.5700 -109.6000       8.1        33       105        60
OIR    2025250     91400   20.5700 -109.6100       8.2        33       105        60
OIR    2025250     91400   20.5700 -109.6200       8.2        32       107        60
OIR    2025250     91400   20.5700 -109.6300       8.2        32       108        60
OIR    2025250     91400   20.5700 -109.6400       8.2        32       109        60
OIR    2025250     91400   20.5700 -109.6500       8.3        33       110        60
OIR    2025250     91400   20.5700 -109.6600       8.5        33       111        60
OIR    2025250     91400   20.5700 -109.6700       8.9        34       110        60
OIR    2025250     91400   20.5700 -109.6800       9.4        35       110        60
OIR    2025250     91400   20.5700 -109.6900      10.0        35       109        60
OIR    2025250     91400   20.5700 -109.7000      10.9        34       108        60
OIR    2025250     91400   20.5700 -109.7100      12.4        31       107        60
OIR    2025250     91400   20.5700 -109.7200      14.0        29       105        60
OIR    2025250     91400   20.5700 -109.7300      15.4        27       105        60
OIR    2025250     91400   20.5700 -109.7400      15.6        28       105        60
OIR    2025250     91400   20.5700 -109.7500      15.3        28       107        60
OIR    2025250     91400   20.5700 -109.7600      14.1        27       108        60
OIR    2025250     91400   20.5700 -109.7700      12.4        27       107        60
OIR    2025250     91400   20.5700 -109.7800      11.3        28       107        60
OIR    2025250     91400   20.5700 -109.7900      10.7        28       109        60
OIR    2025250     91400   20.5700 -109.8000      10.2        28       112        60
OIR    2025250     91400   20.5700 -109.8100       9.8        26       114        60
OIR    2025250     91400   20.5700 -109.8200       9.3        24       115        60
OIR    2025250     91400   20.5700 -109.8300       8.9        18       116        60
OIR    2025250     91400   20.5700 -109.8400       8.5        11       115        60
OIR    2025250     91400   20.5700 -109.8500       8.1         5       115        60
OIR    2025250     91400   20.5700 -109.8600       7.9         3       114        60
OIR    2025250     91400   20.5700 -109.8700       7.5         2       112        60
OIR    2025250     91400   20.5700 -109.8800       6.8       359       111        60
OIR    2025250     91400   20.5700 -109.8900       6.0       356       111        60
OIR    2025250     91400   20.5700 -109.9000       5.3       357       111        60
OIR    2025250     91400   20.5700 -109.9100       4.4         2       113        60
OIR    2025250     91400   20.5700 -116.1600       5.3       183       140        60
OIR    2025250     91400   20.5700 -116.1700       6.5       196       129        60
OIR    2025250     91400   20.5700 -116.1800       8.4       200       135        60
OIR    2025250     91400   20.5600 -109.3700       9.8        52       135        60
OIR    2025250     91400   20.5600 -109.3800       9.9        52       127        60
OIR    2025250     91400   20.5600 -109.3900      10.4        49       122        60
OIR    2025250     91400   20.5600 -109.4000       9.9        48       120        60
OIR    2025250     91400   20.5600 -109.4100       7.9        52       119        60
OIR    2025250     91400   20.5600 -109.4200       7.0        60       116        60
OIR    2025250     91400   20.5600 -109.4300       6.3        71       116        60
OIR    2025250     91400   20.5600 -109.4400       5.9        69       114        60
OIR    2025250     91400   20.5600 -109.4500       6.8        49       113        60
OIR    2025250     91400   20.5600 -109.4600       7.3        40       112        60
OIR    2025250     91400   20.5600 -109.4700       7.7        37       111        60
OIR    2025250     91400   20.5600 -109.4800       8.0        35       111        60
OIR    2025250     91400   20.5600 -109.4900       8.1        34       111        60
OIR    2025250     91400   20.5600 -109.5000       8.1        34       110        60
OIR    2025250     91400   20.5600 -109.5100       8.1        34       109        60
OIR    2025250     91400   20.5600 -109.5200       7.8        33       109        60
OIR    2025250     91400   20.5600 -109.5300       7.1        30       108        60
OIR    2025250     91400   20.5600 -109.5400       6.2        27       107        60
OIR    2025250     91400   20.5600 -109.5500       5.8        27       107        60
OIR    2025250     91400   20.5600 -109.5600       6.1        29       107        60
OIR    2025250     91400   20.5600 -109.5700       6.6        30       107        60
OIR    2025250     91400   20.5600 -109.5800       7.1        33       107        60
OIR    2025250     91400   20.5600 -109.5900       7.6        33       107        60
OIR    2025250     91400   20.5600 -109.6000       8.0        32       107        60
OIR    2025250     91400   20.5600 -109.6100       8.1        32       107        60
OIR    2025250     91400   20.5600 -109.6200       8.2        32       108        60
OIR    2025250     91400   20.5600 -109.6300       8.2        32       109        60
OIR    2025250     91400   20.5600 -109.6400       8.2        33       110        60
OIR    2025250     91400   20.5600 -109.6500       8.3        33       111        60
OIR    2025250     91400   20.5600 -109.6600       8.6        34       112        60
OIR    2025250     91400   20.5600 -109.6700       9.1        36       112        60
OIR    2025250     91400   20.5600 -109.6800       9.7        38       112        60
OIR    2025250     91400   20.5600 -109.6900      10.8        39       111        60
OIR    2025250     91400   20.5600 -109.7000      12.0        37       111        60
OIR    2025250     91400   20.5600 -109.7100      13.8        33       111        60
OIR    2025250     91400   20.5600 -109.7200      15.5        30       111        60
OIR    2025250     91400   20.5600 -109.7300      17.2        28       110        60
OIR    2025250     91400   20.5600 -109.7400      18.3        27       110        60
OIR    2025250     91400   20.5600 -109.7500      18.2        27       110        60
OIR    2025250     91400   20.5600 -109.7600      16.6        27       111        60
OIR    2025250     91400   20.5600 -109.7700      14.0        27       111        60
OIR    2025250     91400   20.5600 -109.7800      12.0        28       110        60
OIR    2025250     91400   20.5600 -109.7900      11.4        28       112        60
OIR    2025250     91400   20.5600 -109.8000      10.9        27       115        60
OIR    2025250     91400   20.5600 -109.8100      10.4        25       116        60
OIR    2025250     91400   20.5600 -109.8200       9.9        21       116        60
OIR    2025250     91400   20.5600 -109.8300       9.1        14       117        60
OIR    2025250     91400   20.5600 -109.8400       8.7         6       116        60
OIR    2025250     91400   20.5600 -109.8500       8.3         1       115        60
OIR    2025250     91400   20.5600 -109.8600       8.0       360       113        60
OIR    2025250     91400   20.5600 -109.8700       7.6       359       111        60
OIR    2025250     91400   20.5600 -109.8800       6.8       356       109        60
OIR    2025250     91400   20.5600 -109.8900       5.9       353       109        60
OIR    2025250     91400   20.5600 -109.9000       5.3       352       109        60
OIR    2025250     91400   20.5600 -109.9100       4.6       354       111        60
OIR    2025250     91400   20.5600 -109.9200       4.2       356       114        60
OIR    2025250     91400   20.5600 -116.1700       5.4       198       133        60
OIR    2025250     91400   20.5600 -116.1800       7.8       198       133        60
OIR    2025250     91400   20.5600 -116.1900       9.0       200       136        60
OIR    2025250     91400   20.5500 -109.3800       7.6        70       139        60
OIR    2025250     91400   20.5500 -109.3900       7.9        67       132        60
OIR    2025250     91400   20.5500 -109.4000       7.7        65       129        60
OIR    2025250     91400   20.5500 -109.4100       7.2        65       125        60
OIR    2025250     91400   20.5500 -109.4200       6.6        71       122        60
OIR    2025250     91400   20.5500 -109.4300       6.1        85       120        60
OIR    2025250     91400   20.5500 -109.4400       5.6        80       117        60
OIR    2025250     91400   20.5500 -109.4500       6.3        59       116        60
OIR    2025250     91400   20.5500 -109.4600       6.7        44       116        60
OIR    2025250     91400   20.5500 -109.4700       6.8        42       115        60
OIR    2025250     91400   20.5500 -109.4800       7.2        37       114        60
OIR    2025250     91400   20.5500 -109.4900       7.9        34       114        60
OIR    2025250     91400   20.5500 -109.5000       7.9        34       112        60
OIR    2025250     91400   20.5500 -109.5100       7.4        34       110        60
OIR    2025250     91400   20.5500 -109.5200       6.5        31       109        60
OIR    2025250     91400   20.5500 -109.5300       5.1        24       109        60
OIR    2025250     91400   20.5500 -109.5400       4.3        21       109        60
OIR    2025250     91400   20.5500 -109.5500       4.0        22       109        60
OIR    2025250     91400   20.5500 -109.5600       4.4        23       109        60
OIR    2025250     91400   20.5500 -109.5700       5.3        28       109        60
OIR    2025250     91400   20.5500 -109.5800       6.0        32       109        60
OIR    2025250     91400   20.5500 -109.5900       7.0        32       108        60
OIR    2025250     91400   20.5500 -109.6000       7.7        32       108        60
OIR    2025250     91400   20.5500 -109.6100       8.0        32       109        60
OIR    2025250     91400   20.5500 -109.6200       8.1        32       109        60
OIR    2025250     91400   20.5500 -109.6300       8.2        32       110        60
OIR    2025250     91400   20.5500 -109.6400       8.2        33       111        60
OIR    2025250     91400   20.5500 -109.6500       8.2        34       111        60
OIR    2025250     91400   20.5500 -109.6600       8.5        36       111        60
OIR    2025250     91400   20.5500 -109.6700       9.2        40       112        60
OIR    2025250     91400   20.5500 -109.6800      10.3        43       113        60
OIR    2025250     91400   20.5500 -109.6900      11.4        46       114        60
OIR    2025250     91400   20.5500 -109.7000      12.9        45       115        60
OIR    2025250     91400   20.5500 -109.7100      14.5        42       116        60
OIR    2025250     91400   20.5500 -109.7200      15.8        37       116        60
OIR    2025250     91400   20.5500 -109.7300      17.7        31       116        60
OIR    2025250     91400   20.5500 -109.7400      19.3        28       116        60
OIR    2025250     91400   20.5500 -109.7500      19.5        27       116        60
OIR    2025250     91400   20.5500 -109.7600      18.5        27       115        60
OIR    2025250     91400   20.5500 -109.7700      15.4        27       115        60
OIR    2025250     91400   20.5500 -109.7800      12.6        28       114        60
OIR    2025250     91400   20.5500 -109.7900      11.8        28       115        60
OIR    2025250     91400   20.5500 -109.8000      11.2        27       117        60
OIR    2025250     91400   20.5500 -109.8100      10.7        24       122        60
OIR    2025250     91400   20.5500 -109.8200      10.0        19       121        60
OIR    2025250     91400   20.5500 -109.8300       9.1         8       121        60
OIR    2025250     91400   20.5500 -109.8400       8.7         2       120        60
OIR    2025250     91400   20.5500 -109.8500       8.3       359       117        60
OIR    2025250     91400   20.5500 -109.8600       8.1       359       115        60
OIR    2025250     91400   20.5500 -109.8700       7.7       358       113        60
OIR    2025250     91400   20.5500 -109.8800       6.8       354       110        60
OIR    2025250     91400   20.5500 -109.8900       6.0       350       109        60
OIR    2025250     91400   20.5500 -109.9000       5.3       347       109        60
OIR    2025250     91400   20.5500 -109.9100       4.6       346       111        60
OIR    2025250     91400   20.5500 -109.9200       4.3       350       116        60
OIR    2025250     91400   20.5500 -109.9300       4.2       350       120        60
OIR    2025250     91400   20.5500 -109.9500       4.1       349       133        60
OIR    2025250     91400   20.5500 -109.9600       4.2       356       140        60
OIR    2025250     91400   20.5500 -116.1700       6.4       206       136        60
OIR    2025250     91400   20.5500 -116.1800       7.2       200       135        60
OIR    2025250     91400   20.5500 -116.1900       8.4       202       138        60
OIR    2025250     91400   20.5400 -109.4000       7.1        73       140        60
OIR    2025250     91400   20.5400 -109.4100       6.1        76       134        60
OIR    2025250     91400   20.5400 -109.4200       6.2        79       128        60
OIR    2025250     91400   20.5400 -109.4300       6.2        89       124        60
OIR    2025250     91400   20.5400 -109.4400       5.9        86       121        60
OIR    2025250     91400   20.5400 -109.4500       6.1        66       121        60
OIR    2025250     91400   20.5400 -109.4600       5.9        54       121        60
OIR    2025250     91400   20.5400 -109.4700       5.7        50       121        60
OIR    2025250     91400   20.5400 -109.4800       5.7        44       121        60
OIR    2025250     91400   20.5400 -109.4900       6.2        37       120        60
OIR    2025250     91400   20.5400 -109.5000       6.4        34       116        60
OIR    2025250     91400   20.5400 -109.5100       5.8        34       115        60
OIR    2025250     91400   20.5400 -109.5200       4.5        29       112        60
OIR    2025250     91400   20.5400 -109.5700       4.3        26       112        60
OIR    2025250     91400   20.5400 -109.5800       5.0        31       111        60
OIR    2025250     91400   20.5400 -109.5900       6.2        32       111        60
OIR    2025250     91400   20.5400 -109.6000       7.3        31       110        60
OIR    2025250     91400   20.5400 -109.6100       7.9        31       110        60
OIR    2025250     91400   20.5400 -109.6200       8.1        32       110        60
OIR    2025250     91400   20.5400 -109.6300       8.2        32       111        60
OIR    2025250     91400   20.5400 -109.6400       8.1        33       112        60
OIR    2025250     91400   20.5400 -109.6500       8.0        35       112        60
OIR    2025250     91400   20.5400 -109.6600       7.9        42       112        60
OIR    2025250     91400   20.5400 -109.6700       8.5        49       113        60
OIR    2025250     91400   20.5400 -109.6800      10.3        56       115        60
OIR    2025250     91400   20.5400 -109.6900      12.1        57       116        60
OIR    2025250     91400   20.5400 -109.7000      13.7        53       119        60
OIR    2025250     91400   20.5400 -109.7100      15.3        48       122        60
OIR    2025250     91400   20.5400 -109.7200      16.8        42       124        60
OIR    2025250     91400   20.5400 -109.7300      19.1        35       125        60
OIR    2025250     91400   20.5400 -109.7400      20.1        30       126        60
OIR    2025250     91400   20.5400 -109.7500      19.9        28       124        60
OIR    2025250     91400   20.5400 -109.7600      19.0        28       121        60
OIR    2025250     91400   20.5400 -109.7700      15.7        28       120        60
OIR    2025250     91400   20.5400 -109.7800      12.7        28       119        60
OIR    2025250     91400   20.5400 -109.7900      12.0        28       117        60
OIR    2025250     91400   20.5400 -109.8000      11.4        27       121        60
OIR    2025250     91400   20.5400 -109.8100      10.9        25       124        60
OIR    2025250     91400   20.5400 -109.8200      10.0        19       124        60
OIR    2025250     91400   20.5400 -109.8300       8.8         5       124        60
OIR    2025250     91400   20.5400 -109.8400       8.5       360       123        60
OIR    2025250     91400   20.5400 -109.8500       8.3       358       121        60
OIR    2025250     91400   20.5400 -109.8600       8.2       357       117        60
OIR    2025250     91400   20.5400 -109.8700       8.0       357       115        60
OIR    2025250     91400   20.5400 -109.8800       7.5       353       111        60
OIR    2025250     91400   20.5400 -109.8900       6.4       348       109        60
OIR    2025250     91400   20.5400 -109.9000       5.8       344       110        60
OIR    2025250     91400   20.5400 -109.9100       5.3       339       111        60
OIR    2025250     91400   20.5400 -109.9200       5.3       338       116        60
OIR    2025250     91400   20.5400 -109.9300       5.2       340       123        60
OIR    2025250     91400   20.5400 -109.9400       4.8       343       129        60
OIR    2025250     91400   20.5400 -109.9500       4.5       345       138        60
OIR    2025250     91400   20.5400 -116.1700       8.5       207       139        60
OIR    2025250     91400   20.5400 -116.1800       9.1       205       139        60
OIR    2025250     91400   20.5300 -109.4200       7.3       116       139        60
OIR    2025250     91400   20.5300 -109.4300       7.5       113       135        60
OIR    2025250     91400   20.5300 -109.4400       7.4       112       130        60
OIR    2025250     91400   20.5300 -109.4500       6.1        98       128        60
OIR    2025250     91400   20.5300 -109.4600       5.2        76       129        60
OIR    2025250     91400   20.5300 -109.4700       5.0        60       129        60
OIR    2025250     91400   20.5300 -109.4800       5.1        48       128        60
OIR    2025250     91400   20.5300 -109.4900       5.2        40       126        60
OIR    2025250     91400   20.5300 -109.5000       5.1        36       123        60
OIR    2025250     91400   20.5300 -109.5100       4.4        34       120        60
OIR    2025250     91400   20.5300 -109.5800       4.5        30       114        60
OIR    2025250     91400   20.5300 -109.5900       5.6        30       113        60
OIR    2025250     91400   20.5300 -109.6000       7.2        29       113        60
OIR    2025250     91400   20.5300 -109.6100       8.5        26       112        60
OIR    2025250     91400   20.5300 -109.6200       9.0        25       111        60
OIR    2025250     91400   20.5300 -109.6300       9.1        25       112        60
OIR    2025250     91400   20.5300 -109.6400       8.5        30       112        60
OIR    2025250     91400   20.5300 -109.6500       8.1        35       112        60
OIR    2025250     91400   20.5300 -109.6600       7.4        49       113        60
OIR    2025250     91400   20.5300 -109.6700       8.1        61       113        60
OIR    2025250     91400   20.5300 -109.6800      10.1        66       116        60
OIR    2025250     91400   20.5300 -109.6900      12.3        64       119        60
OIR    2025250     91400   20.5300 -109.7000      14.0        59       123        60
OIR    2025250     91400   20.5300 -109.7100      16.1        51       128        60
OIR    2025250     91400   20.5300 -109.7200      17.7        45       133        60
OIR    2025250     91400   20.5300 -109.7300      19.7        38       135        60
OIR    2025250     91400   20.5300 -109.7400      20.2        32       137        60
OIR    2025250     91400   20.5300 -109.7500      19.9        28       136        60
OIR    2025250     91400   20.5300 -109.7600      18.6        26       133        60
OIR    2025250     91400   20.5300 -109.7700      14.9        25       130        60
OIR    2025250     91400   20.5300 -109.7800      12.8        28       126        60
OIR    2025250     91400   20.5300 -109.7900      12.3        28       122        60
OIR    2025250     91400   20.5300 -109.8000      11.6        28       122        60
OIR    2025250     91400   20.5300 -109.8100      10.8        27       124        60
OIR    2025250     91400   20.5300 -109.8200       9.5        20       125        60
OIR    2025250     91400   20.5300 -109.8300       8.3         5       125        60
OIR    2025250     91400   20.5300 -109.8400       8.3       358       125        60
OIR    2025250     91400   20.5300 -109.8500       8.2       357       123        60
OIR    2025250     91400   20.5300 -109.8600       8.2       357       120        60
OIR    2025250     91400   20.5300 -109.8700       8.1       356       117        60
OIR    2025250     91400   20.5300 -109.8800       7.9       353       115        60
OIR    2025250     91400   20.5300 -109.8900       6.4       344       113        60
OIR    2025250     91400   20.5300 -109.9000       5.9       340       116        60
OIR    2025250     91400   20.5300 -109.9100       5.6       337       120        60
OIR    2025250     91400   20.5300 -109.9200       5.4       336       124        60
OIR    2025250     91400   20.5300 -109.9300       5.5       336       129        60
OIR    2025250     91400   20.5300 -109.9400       6.0       336       134        60
OIR    2025250     91400   20.5200 -109.4600       6.4        75       141        60
OIR    2025250     91400   20.5200 -109.4700       5.1        64       139        60
OIR    2025250     91400   20.5200 -109.4800       4.7        53       136        60
OIR    2025250     91400   20.5200 -109.4900       4.3        42       132        60
OIR    2025250     91400   20.5200 -109.5000       4.0        36       129        60
OIR    2025250     91400   20.5200 -109.5700       4.0        25       120        60
OIR    2025250     91400   20.5200 -109.5800       5.0        26       119        60
OIR    2025250     91400   20.5200 -109.5900       6.3        25       117        60
OIR    2025250     91400   20.5200 -109.6000       7.7        24       116        60
OIR    2025250     91400   20.5200 -109.6100       8.6        23       116        60
OIR    2025250     91400   20.5200 -109.6200       9.2        22       116        60
OIR    2025250     91400   20.5200 -109.6300       9.5        22       116        60
OIR    2025250     91400   20.5200 -109.6400       9.4        24       117        60
OIR    2025250     91400   20.5200 -109.6500       8.9        30       117        60
OIR    2025250     91400   20.5200 -109.6600       9.3        37       119        60
OIR    2025250     91400   20.5200 -109.6700      11.4        39       119        60
OIR    2025250     91400   20.5200 -109.6800      12.7        47       123        60
OIR    2025250     91400   20.5200 -109.6900      14.1        55       127        60
OIR    2025250     91400   20.5200 -109.7000      15.3        56       131        60
OIR    2025250     91400   20.5200 -109.7100      15.9        54       136        60
OIR    2025250     91400   20.5200 -109.7700      15.8        25       138        60
OIR    2025250     91400   20.5200 -109.7800      13.2        26       132        60
OIR    2025250     91400   20.5200 -109.7900      12.6        29       126        60
OIR    2025250     91400   20.5200 -109.8000      11.6        31       123        60
OIR    2025250     91400   20.5200 -109.8100      10.4        30       124        60
OIR    2025250     91400   20.5200 -109.8200       9.2        23       125        60
OIR    2025250     91400   20.5200 -109.8300       8.4         7       125        60
OIR    2025250     91400   20.5200 -109.8400       8.4       359       126        60
OIR    2025250     91400   20.5200 -109.8500       8.3       357       125        60
OIR    2025250     91400   20.5200 -109.8600       8.2       356       122        60
OIR    2025250     91400   20.5200 -109.8700       8.1       355       120        60
OIR    2025250     91400   20.5200 -109.8800       7.9       353       119        60
OIR    2025250     91400   20.5200 -109.8900       6.8       345       116        60
OIR    2025250     91400   20.5200 -109.9000       5.9       338       121        60
OIR    2025250     91400   20.5200 -109.9100       5.4       336       128        60
OIR    2025250     91400   20.5200 -109.9200       5.3       336       133        60
OIR    2025250     91400   20.5200 -109.9300       5.9       333       137        60
OIR    2025250     91400   20.5200 -109.9400       6.4       333       142        60
OIR    2025250     91400   20.5100 -109.4900       4.2        43       141        60
OIR    2025250     91400   20.5100 -109.5700       4.0        27       125        60
OIR    2025250     91400   20.5100 -109.5800       4.8        28       124        60
OIR    2025250     91400   20.5100 -109.5900       6.3        26       123        60
OIR    2025250     91400   20.5100 -109.6000       7.6        24       122        60
OIR    2025250     91400   20.5100 -109.6100       8.6        22       122        60
OIR    2025250     91400   20.5100 -109.6200       9.4        20       123        60
OIR    2025250     91400   20.5100 -109.6300      10.2        17       123        60
OIR    2025250     91400   20.5100 -109.6400      12.9         8       125        60
OIR    2025250     91400   20.5100 -109.6500      16.8         6       126        60
OIR    2025250     91400   20.5100 -109.6600      18.6        12       127        60
OIR    2025250     91400   20.5100 -109.6700      16.3        25       127        60
OIR    2025250     91400   20.5100 -109.6800      14.8        37       132        60
OIR    2025250     91400   20.5100 -109.6900      14.7        51       137        60
OIR    2025250     91400   20.5100 -109.7700      18.9        26       138        60
OIR    2025250     91400   20.5100 -109.7800      15.2        27       134        60
OIR    2025250     91400   20.5100 -109.7900      14.0        34       129        60
OIR    2025250     91400   20.5100 -109.8000      11.8        35       125        60
OIR    2025250     91400   20.5100 -109.8100      10.4        33       126        60
OIR    2025250     91400   20.5100 -109.8200       9.3        22       128        60
OIR    2025250     91400   20.5100 -109.8300       9.1         8       131        60
OIR    2025250     91400   20.5100 -109.8400       9.0         3       134        60
OIR    2025250     91400   20.5100 -109.8500       8.6       359       136        60
OIR    2025250     91400   20.5100 -109.8600       8.2       356       132        60
OIR    2025250     91400   20.5100 -109.8700       8.1       353       130        60
OIR    2025250     91400   20.5100 -109.8800       7.9       351       129        60
OIR    2025250     91400   20.5100 -109.8900       6.9       342       127        60
OIR    2025250     91400   20.5100 -109.9000       5.6       334       129        60
OIR    2025250     91400   20.5100 -109.9100       5.2       334       135        60
OIR    2025250     91400   20.5100 -109.9200       5.3       334       142        60
OIR    2025250     91400   20.5000 -109.5800       4.6        36       136        60
OIR    2025250     91400   20.5000 -109.5900       5.8        34       136        60
OIR    2025250     91400   20.5000 -109.6000       6.5        31       137        60
OIR    2025250     91400   20.5000 -109.6100       8.2        22       137        60
OIR    2025250     91400   20.5000 -109.6200       9.7        18       138        60
OIR    2025250     91400   20.5000 -109.6300      12.4         7       138        60
OIR    2025250     91400   20.5000 -109.7800      19.2        28       135        60
OIR    2025250     91400   20.5000 -109.7900      15.9        35       132        60
OIR    2025250     91400   20.5000 -109.8000      13.3        35       129        60
OIR    2025250     91400   20.5000 -109.8100      10.7        31       130        60
OIR    2025250     91400   20.5000 -109.8200       9.7        17       131        60
OIR    2025250     91400   20.5000 -109.8300       9.6         6       135        60
OIR    2025250     91400   20.5000 -109.8400       9.2         3       141        60
OIR    2025250     91400   20.5000 -109.8700       8.3       352       139        60
OIR    2025250     91400   20.5000 -109.8800       8.2       349       139        60
OIR    2025250     91400   20.5000 -109.8900       7.1       341       139        60
OIR    2025250     91400   20.5000 -109.9000       5.8       333       139        60
OIR    2025250     91400   20.4800 -110.9700       9.7        41       122        60
OIR    2025250     91400   20.4500 -111.1700       8.0        40       141        60
OIR    2025250     91400   20.4400 -111.0400       9.3        40       154        60
OIR    2025250     91400   20.4400 -111.0500       9.2        40       122        60
OIR    2025250     91400   20.4400 -111.0600       9.1        40       147        60
OIR    2025250     91400   20.4300 -111.0500       9.2        40       151        60
OIR    2025250     91400   20.4300 -111.0600       9.1        40       153        60
OIR    2025250     91400   20.4200 -110.9100      10.0        42       143        60
OIR    2025250     91400   20.3900 -114.2600      14.7       140       139        60
OIR    2025250     91400   20.3800 -114.2600      14.7       141       131        60
OIR    2025250     91400   20.3700 -110.9000      10.2        40       150        60
OIR    2025250     91400   20.3700 -114.2600      14.7       141       135        60
OIR    2025250     91400   20.3600 -110.9000      10.2        40       125        60
OIR    2025250     91400   20.3600 -110.9100      10.1        40       129        60
OIR    2025250     91400   20.3600 -114.2600      14.7       141       135        60
OIR    2025250     91400   20.3200 -116.0700      15.7       177       141        60
OIR    2025250     91400   20.3200 -116.0800      15.8       177       140        60
OIR    2025250     91400   20.3200 -116.0900      15.9       178       140        60
OIR    2025250     91400   20.3200 -116.1500      16.1       178       140        60
OIR    2025250     91400   20.3200 -116.1600      16.1       178       140        60
OIR    2025250     91400   20.3200 -116.1700      16.2       178       141        60
OIR    2025250     91400   20.3100 -116.1200      16.0       178       141        60
OIR    2025250     91400   20.3100 -116.1300      16.0       178       139        60
OIR    2025250     91400   20.3100 -116.1400      16.1       178       140        60
OIR    2025250     91400   20.3100 -116.1500      16.1       178       140        60
OIR    2025250     91400   20.3100 -116.1600      16.1       178       140        60
OIR    2025250     91400   20.3100 -116.1700      16.2       178       141        60
OIR    2025250     91400   20.3000 -116.1300      16.0       178       139        60
OIR    2025250     91400   20.3000 -116.1400      16.1       178       139        60
OIR    2025250     91400   20.3000 -116.1500      16.1       178       141        60
OIR    2025250     91400   20.2900 -116.0700      15.6       178       140        60
OIR    2025250     91400   20.2900 -116.1300      16.0       178       139        60
OIR    2025250     91400   20.2900 -116.1400      16.1       178       138        60
OIR    2025250     91400   20.2900 -116.1500      16.1       178       140        60
OIR    2025250     91400   20.2800 -116.0600      15.5       178       140        60
OIR    2025250     91400   20.2800 -116.0700      15.6       178       138        60
OIR    2025250     91400   20.2800 -116.1100      15.9       178       141        60
OIR    2025250     91400   20.2800 -116.1200      15.9       178       139        60
OIR    2025250     91400   20.2800 -116.1300      16.0       178       139        60
OIR    2025250     91400   20.2800 -116.1400      16.1       178       138        60
OIR    2025250     91400   20.2800 -116.1500      16.1       178       140        60
OIR    2025250     91400   20.2700 -116.0600      15.5       178       140        60
OIR    2025250     91400   20.2700 -116.0700      15.6       178       136        60
OIR    2025250     91400   20.2700 -116.0800      15.6       178       139        60
OIR    2025250     91400   20.2700 -116.1100      15.9       179       140        60
OIR    2025250     91400   20.2700 -116.1200      16.0       179       139        60
OIR    2025250     91400   20.2700 -116.1300      16.0       179       140        60
OIR    2025250     91400   20.2700 -116.1400      16.1       178       140        60
OIR    2025250     91400   20.2600 -116.0600      15.5       179       139        60
OIR    2025250     91400   20.2600 -116.0700      15.6       179       136        60
OIR    2025250     91400   20.2600 -116.0800      15.6       179       137        60
OIR    2025250     91400   20.2600 -116.0900      15.7       179       139        60
OIR    2025250     91400   20.2600 -116.1000      15.8       179       140        60
OIR    2025250     91400   20.2600 -116.1100      15.9       179       139        60
OIR    2025250     91400   20.2600 -116.1200      16.0       179       139        60
OIR    2025250     91400   20.2500 -116.0600      15.5       179       141        60
OIR    2025250     91400   20.2500 -116.0700      15.6       179       138        60
OIR    2025250     91400   20.2500 -116.0800      15.6       179       137        60
OIR    2025250     91400   20.2500 -116.0900      15.7       179       138        60
OIR    2025250     91400   20.2500 -116.1000      15.8       179       138        60
OIR    2025250     91400   20.2500 -116.1100      15.9       179       138        60
OIR    2025250     91400   20.2500 -116.1200      16.0       179       138        60
OIR    2025250     91400   20.2400 -116.0700      15.6       180       141        60
OIR    2025250     91400   20.2400 -116.0800      15.7       180       139        60
OIR    2025250     91400   20.2400 -116.0900      15.8       180       138        60
OIR    2025250     91400   20.2400 -116.1000      15.9       180       137        60
OIR    2025250     91400   20.2400 -116.1100      16.0       180       138        60
OIR    2025250     91400   20.2400 -116.1200      16.1       180       138        60
OIR    2025250     91400   20.2400 -116.1300      16.2       180       141        60
OIR    2025250     91400   20.2300 -116.0700      15.7       180       142        60
OIR    2025250     91400   20.2300 -116.0800      15.7       180       140        60
OIR    2025250     91400   20.2300 -116.0900      15.8       180       139        60
OIR    2025250     91400   20.2300 -116.1000      15.9       181       138        60
OIR    2025250     91400   20.2300 -116.1100      16.0       180       138        60
OIR    2025250     91400   20.2300 -116.1200      16.2       181       139        60
OIR    2025250     91400   20.2300 -116.1300      16.3       181       141        60
OIR    2025250     91400   20.2200 -116.0800      15.7       180       140        60
OIR    2025250     91400   20.2200 -116.0900      15.8       181       140        60
OIR    2025250     91400   20.2200 -116.1000      15.9       181       139        60
OIR    2025250     91400   20.2200 -116.1100      16.1       181       139        60
OIR    2025250     91400   20.2200 -116.1200      16.2       181       141        60
OIR    2025250     91400   20.2100 -116.0800      15.7       180       141        60
OIR    2025250     91400   20.2100 -116.0900      15.8       181       140        60
OIR    2025250     91400   20.2100 -116.1000      15.9       181       140        60
OIR    2025250     91400   20.2100 -116.1100      16.1       181       140        60
OIR    2025250     91400   20.2100 -116.1200      16.3       182       141        60
OIR    2025250     91400   20.2100 -116.1700      16.2       184       141        60
OIR    2025250     91400   20.2000 -116.0800      15.7       180       142        60
OIR    2025250     91400   20.2000 -116.0900      15.7       181       141        60
OIR    2025250     91400   20.2000 -116.1000      15.8       181       141        60
OIR    2025250     91400   20.2000 -116.1100      16.0       181       141        60
OIR    2025250     91400   20.2000 -116.1200      16.3       183       140        60
OIR    2025250     91400   20.2000 -116.1300      16.5       183       139        60
OIR    2025250     91400   20.2000 -116.1400      16.4       184       139        60
OIR    2025250     91400   20.2000 -116.1500      16.0       186       138        60
OIR    2025250     91400   20.2000 -116.1600      16.0       188       138        60
OIR    2025250     91400   20.2000 -116.1700      16.1       189       138        60
OIR    2025250     91400   20.2000 -116.1800      16.1       189       140        60
OIR    2025250     91400   20.1900 -116.0900      15.7       181       141        60
OIR    2025250     91400   20.1900 -116.1000      15.8       181       141        60
OIR    2025250     91400   20.1900 -116.1100      16.1       182       141        60
OIR    2025250     91400   20.1900 -116.1200      16.4       183       139        60
OIR    2025250     91400   20.1900 -116.1300      16.5       184       136        60
OIR    2025250     91400   20.1900 -116.1400      16.5       186       135        60
OIR    2025250     91400   20.1900 -116.1500      16.2       189       134        60
OIR    2025250     91400   20.1900 -116.1600      16.1       190       134        60
OIR    2025250     91400   20.1900 -116.1700      16.1       190       135        60
OIR    2025250     91400   20.1900 -116.1800      16.1       191       137        60
OIR    2025250     91400   20.1900 -116.1900      16.1       191       141        60
OIR    2025250     91400   20.1800 -113.8400      18.4       167       140        60
OIR    2025250     91400   20.1800 -116.0500      15.5       180       142        60
OIR    2025250     91400   20.1800 -116.0900      15.7       180       142        60
OIR    2025250     91400   20.1800 -116.1000      15.8       181       140        60
OIR    2025250     91400   20.1800 -116.1100      16.1       182       139        60
OIR    2025250     91400   20.1800 -116.1200      16.3       183       137        60
OIR    2025250     91400   20.1800 -116.1300      16.4       185       134        60
OIR    2025250     91400   20.1800 -116.1400      16.4       187       133        60
OIR    2025250     91400   20.1800 -116.1500      16.2       190       131        60
OIR    2025250     91400   20.1800 -116.1600      16.1       190       131        60
OIR    2025250     91400   20.1800 -116.1700      16.1       191       133        60
OIR    2025250     91400   20.1800 -116.1800      16.1       191       134        60
OIR    2025250     91400   20.1800 -116.1900      16.0       191       138        60
OIR    2025250     91400   20.1800 -116.2000      15.8       191       142        60
OIR    2025250     91400   20.1700 -113.8100      13.9       166       139        60
OIR    2025250     91400   20.1700 -113.8200      15.9       166       137        60
OIR    2025250     91400   20.1700 -113.8300      17.5       166       137        60
OIR    2025250     91400   20.1700 -113.8400      18.2       167       137        60
OIR    2025250     91400   20.1700 -113.8500      18.2       166       137        60
OIR    2025250     91400   20.1700 -113.8600      18.0       166       138        60
OIR    2025250     91400   20.1700 -113.8700      17.3       166       139        60
OIR    2025250     91400   20.1700 -116.0500      15.4       179       141        60
OIR    2025250     91400   20.1700 -116.0600      15.5       180       142        60
OIR    2025250     91400   20.1700 -116.1000      15.7       181       141        60
OIR    2025250     91400   20.1700 -116.1100      16.0       182       139        60
OIR    2025250     91400   20.1700 -116.1200      16.2       183       137        60
OIR    2025250     91400   20.1700 -116.1300      16.3       185       134        60
OIR    2025250     91400   20.1700 -116.1400      16.3       188       132        60
OIR    2025250     91400   20.1700 -116.1500      16.1       190       130        60
OIR    2025250     91400   20.1700 -116.1600      16.1       191       130        60
OIR    2025250     91400   20.1700 -116.1700      16.0       191       131        60
OIR    2025250     91400   20.1700 -116.1800      16.0       191       132        60
OIR    2025250     91400   20.1700 -116.1900      16.0       191       135        60
OIR    2025250     91400   20.1700 -116.2000      15.8       191       139        60
OIR    2025250     91400   20.1700 -116.2100      15.2       191       140        60
OIR    2025250     91400   20.1700 -116.2200      14.8       192       142        60
OIR    2025250     91400   20.1600 -113.8000      12.4       166       139        60
OIR    2025250     91400   20.1600 -113.8100      13.5       167       137        60
OIR    2025250     91400   20.1600 -113.8200      14.0       167       134        60
OIR    2025250     91400   20.1600 -113.8300      15.0       166       134        60
OIR    2025250     91400   20.1600 -113.8400      16.5       166       135        60
OIR    2025250     91400   20.1600 -113.8500      17.4       166       136        60
OIR    2025250     91400   20.1600 -113.8600      17.2       166       136        60
OIR    2025250     91400   20.1600 -113.8700      15.3       165       136        60
OIR    2025250     91400   20.1600 -113.8800      13.3       164       136        60
OIR    2025250     91400   20.1600 -113.8900      12.8       163       137        60
OIR    2025250     91400   20.1600 -113.9000      12.6       164       139        60
OIR    2025250     91400   20.1600 -116.0900      15.6       180       142        60
OIR    2025250     91400   20.1600 -116.1000      15.6       181       141        60
OIR    2025250     91400   20.1600 -116.1100      15.7       182       140        60
OIR    2025250     91400   20.1600 -116.1200      15.8       183       139        60
OIR    2025250     91400   20.1600 -116.1300      15.9       186       136        60
OIR    2025250     91400   20.1600 -116.1400      16.0       189       134        60
OIR    2025250     91400   20.1600 -116.1500      16.0       190       132        60
OIR    2025250     91400   20.1600 -116.1600      16.0       191       130        60
OIR    2025250     91400   20.1600 -116.1700      15.9       191       132        60
OIR    2025250     91400   20.1600 -116.1800      15.9       191       133        60
OIR    2025250     91400   20.1600 -116.1900      15.8       191       136        60
OIR    2025250     91400   20.1600 -116.2000      15.4       191       138        60
OIR    2025250     91400   20.1600 -116.2100      14.8       191       139        60
OIR    2025250     91400   20.1600 -116.2200      14.5       191       140        60
OIR    2025250     91400   20.1600 -116.2300      14.3       192       141        60
OIR    2025250     91400   20.1500 -113.8100      12.1       166       139        60
OIR    2025250     91400   20.1500 -113.8200      12.6       166       136        60
OIR    2025250     91400   20.1500 -113.8300      13.3       165       135        60
OIR    2025250     91400   20.1500 -113.8400      14.1       165       137        60
OIR    2025250     91400   20.1500 -113.8500      14.4       165       139        60
OIR    2025250     91400   20.1500 -116.1100      15.6       182       142        60
OIR    2025250     91400   20.1500 -116.1200      15.6       183       141        60
OIR    2025250     91400   20.1500 -116.1300      15.7       186       138        60
OIR    2025250     91400   20.1500 -116.1400      15.7       189       136        60
OIR    2025250     91400   20.1500 -116.1500      15.8       190       134        60
OIR    2025250     91400   20.1500 -116.1600      15.8       190       131        60
OIR    2025250     91400   20.1500 -116.1700      15.8       191       132        60
OIR    2025250     91400   20.1500 -116.1800      15.7       191       134        60
OIR    2025250     91400   20.1500 -116.1900      15.5       191       136        60
OIR    2025250     91400   20.1500 -116.2000      15.1       191       137        60
OIR    2025250     91400   20.1500 -116.2100      14.6       191       138        60
OIR    2025250     91400   20.1500 -116.2200      14.4       191       139        60
OIR    2025250     91400   20.1500 -116.2300      14.3       191       140        60
OIR    2025250     91400   20.1500 -116.2400      13.9       192       141        60
OIR    2025250     91400   20.1400 -113.6200      14.4       160       139        60
OIR    2025250     91400   20.1400 -113.7600      11.9       165       140        60
OIR    2025250     91400   20.1400 -113.8000      11.9       165       140        60
OIR    2025250     91400   20.1400 -113.8100      12.0       165       139        60
OIR    2025250     91400   20.1400 -113.8200      12.3       165       138        60
OIR    2025250     91400   20.1400 -113.8300      12.5       165       136        60
OIR    2025250     91400   20.1400 -113.8400      12.8       165       139        60
OIR    2025250     91400   20.1400 -116.0500      15.5       179       141        60
OIR    2025250     91400   20.1400 -116.1300      15.3       186       140        60
OIR    2025250     91400   20.1400 -116.1400      15.4       188       137        60
OIR    2025250     91400   20.1400 -116.1500      15.4       189       135        60
OIR    2025250     91400   20.1400 -116.1600      15.6       190       134        60
OIR    2025250     91400   20.1400 -116.1700      15.6       190       133        60
OIR    2025250     91400   20.1400 -116.1800      15.4       190       133        60
OIR    2025250     91400   20.1400 -116.1900      15.1       190       133        60
OIR    2025250     91400   20.1400 -116.2000      14.7       190       135        60
OIR    2025250     91400   20.1400 -116.2100      14.5       190       137        60
OIR    2025250     91400   20.1400 -116.2200      14.4       190       138        60
OIR    2025250     91400   20.1400 -116.2300      14.4       191       139        60
OIR    2025250     91400   20.1400 -116.2400      14.2       192       141        60
OIR    2025250     91400   20.1300 -113.6000      14.5       160       139        60
OIR    2025250     91400   20.1300 -113.6100      14.4       160       138        60
OIR    2025250     91400   20.1300 -113.6200      14.2       161       137        60
OIR    2025250     91400   20.1300 -113.6300      14.1       161       139        60
OIR    2025250     91400   20.1300 -113.7400      13.2       163       140        60
OIR    2025250     91400   20.1300 -113.7500      12.7       164       138        60
OIR    2025250     91400   20.1300 -113.7600      12.2       164       137        60
OIR    2025250     91400   20.1300 -113.7700      12.0       165       137        60
OIR    2025250     91400   20.1300 -113.7800      11.9       165       137        60
OIR    2025250     91400   20.1300 -113.7900      11.9       165       137        60
OIR    2025250     91400   20.1300 -113.8000      11.8       164       137        60
OIR    2025250     91400   20.1300 -113.8100      11.9       164       137        60
OIR    2025250     91400   20.1300 -113.8200      12.1       165       137        60
OIR    2025250     91400   20.1300 -113.8300      12.3       165       137        60
OIR    2025250     91400   20.1300 -113.8400      12.5       165       139        60
OIR    2025250     91400   20.1300 -116.0500      15.5       178       142        60
OIR    2025250     91400   20.1300 -116.1400      14.9       188       139        60
OIR    2025250     91400   20.1300 -116.1500      14.8       188       137        60
OIR    2025250     91400   20.1300 -116.1600      14.8       189       136        60
OIR    2025250     91400   20.1300 -116.1700      14.7       189       134        60
OIR    2025250     91400   20.1300 -116.1800      14.5       188       133        60
OIR    2025250     91400   20.1300 -116.1900      14.5       189       131        60
OIR    2025250     91400   20.1300 -116.2000      14.5       189       133        60
OIR    2025250     91400   20.1300 -116.2100      14.5       190       135        60
OIR    2025250     91400   20.1300 -116.2200      14.4       190       136        60
OIR    2025250     91400   20.1300 -116.2300      14.4       191       138        60
OIR    2025250     91400   20.1300 -116.2400      14.5       192       140        60
OIR    2025250     91400   20.1200 -113.3000      10.9       144       139        60
OIR    2025250     91400   20.1200 -113.4700      14.1       158       139        60
OIR    2025250     91400   20.1200 -113.4800      14.1       160       139        60
OIR    2025250     91400   20.1200 -113.4900      14.2       161       139        60
OIR    2025250     91400   20.1200 -113.5500      14.0       162       139        60
OIR    2025250     91400   20.1200 -113.5600      14.0       161       138        60
OIR    2025250     91400   20.1200 -113.5700      14.1       161       138        60
OIR    2025250     91400   20.1200 -113.5800      14.2       160       138        60
OIR    2025250     91400   20.1200 -113.5900      14.2       160       138        60
OIR    2025250     91400   20.1200 -113.6000      14.2       160       137        60
OIR    2025250     91400   20.1200 -113.6100      14.1       160       136        60
OIR    2025250     91400   20.1200 -113.6200      13.7       161       135        60
OIR    2025250     91400   20.1200 -113.6300      13.5       161       137        60
OIR    2025250     91400   20.1200 -113.7200      13.4       163       138        60
OIR    2025250     91400   20.1200 -113.7300      13.2       163       137        60
OIR    2025250     91400   20.1200 -113.7400      13.1       163       136        60
OIR    2025250     91400   20.1200 -113.7500      12.9       163       136        60
OIR    2025250     91400   20.1200 -113.7600      12.6       164       135        60
OIR    2025250     91400   20.1200 -113.7700      12.2       164       135        60
OIR    2025250     91400   20.1200 -113.7800      11.9       164       134        60
OIR    2025250     91400   20.1200 -113.7900      11.8       164       134        60
OIR    2025250     91400   20.1200 -113.8000      11.8       164       135        60
OIR    2025250     91400   20.1200 -113.8100      11.8       164       136        60
OIR    2025250     91400   20.1200 -113.8200      11.8       164       137        60
OIR    2025250     91400   20.1200 -113.8300      12.1       164       138        60
OIR    2025250     91400   20.1200 -113.8400      12.2       164       140        60
OIR    2025250     91400   20.1200 -116.1400      14.5       187       141        60
OIR    2025250     91400   20.1200 -116.1500      14.5       188       139        60
OIR    2025250     91400   20.1200 -116.1600      14.4       188       136        60
OIR    2025250     91400   20.1200 -116.1700      14.4       188       134        60
OIR    2025250     91400   20.1200 -116.1800      14.4       188       133        60
OIR    2025250     91400   20.1200 -116.1900      14.4       188       132        60
OIR    2025250     91400   20.1200 -116.2000      14.4       189       133        60
OIR    2025250     91400   20.1200 -116.2100      14.4       189       135        60
OIR    2025250     91400   20.1200 -116.2200      14.4       190       136        60
OIR    2025250     91400   20.1200 -116.2300      14.5       190       136        60
OIR    2025250     91400   20.1200 -116.2400      14.7       192       137        60
OIR    2025250     91400   20.1200 -116.2500      14.8       193       138        60
OIR    2025250     91400   20.1200 -116.2600      14.9       193       139        60
OIR    2025250     91400   20.1100 -109.8900       9.7        68       141        60
OIR    2025250     91400   20.1100 -109.9000       9.4        70       136        60
OIR    2025250     91400   20.1100 -109.9100       9.2        70       139        60
OIR    2025250     91400   20.1100 -109.9200       9.0        70       142        60
OIR    2025250     91400   20.1100 -113.2900      10.3       145       140        60
OIR    2025250     91400   20.1100 -113.3000      10.4       146       138        60
OIR    2025250     91400   20.1100 -113.3100      10.5       147       138        60
OIR    2025250     91400   20.1100 -113.3200      10.6       148       139        60
OIR    2025250     91400   20.1100 -113.4200      12.3       153       139        60
OIR    2025250     91400   20.1100 -113.4300      12.9       155       139        60
OIR    2025250     91400   20.1100 -113.4400      13.2       156       138        60
OIR    2025250     91400   20.1100 -113.4500      13.3       157       137        60
OIR    2025250     91400   20.1100 -113.4600      13.4       158       135        60
OIR    2025250     91400   20.1100 -113.4700      13.5       159       135        60
OIR    2025250     91400   20.1100 -113.4800      13.6       160       134        60
OIR    2025250     91400   20.1100 -113.4900      13.7       161       134        60
OIR    2025250     91400   20.1100 -113.5000      13.8       162       136        60
OIR    2025250     91400   20.1100 -113.5100      13.9       162       137        60
OIR    2025250     91400   20.1100 -113.5200      13.9       162       138        60
OIR    2025250     91400   20.1100 -113.5300      13.9       162       138        60
OIR    2025250     91400   20.1100 -113.5400      13.8       162       136        60
OIR    2025250     91400   20.1100 -113.5500      13.9       161       134        60
OIR    2025250     91400   20.1100 -113.5600      13.9       161       133        60
OIR    2025250     91400   20.1100 -113.5700      13.8       161       133        60
OIR    2025250     91400   20.1100 -113.5800      13.8       160       134        60
OIR    2025250     91400   20.1100 -113.5900      13.8       160       134        60
OIR    2025250     91400   20.1100 -113.6000      13.8       160       135        60
OIR    2025250     91400   20.1100 -113.6100      13.6       160       134        60
OIR    2025250     91400   20.1100 -113.6200      13.3       161       132        60
OIR    2025250     91400   20.1100 -113.6300      13.1       161       135        60
OIR    2025250     91400   20.1100 -113.6400      13.0       161       139        60
OIR    2025250     91400   20.1100 -113.7000      13.0       162       138        60
OIR    2025250     91400   20.1100 -113.7100      13.1       162       137        60
OIR    2025250     91400   20.1100 -113.7200      13.1       163       135        60
OIR    2025250     91400   20.1100 -113.7300      13.1       163       134        60
OIR    2025250     91400   20.1100 -113.7400      13.0       163       133        60
OIR    2025250     91400   20.1100 -113.7500      12.9       163       134        60
OIR    2025250     91400   20.1100 -113.7600      12.7       163       134        60
OIR    2025250     91400   20.1100 -113.7700      12.3       164       134        60
OIR    2025250     91400   20.1100 -113.7800      11.9       164       133        60
OIR    2025250     91400   20.1100 -113.7900      11.8       164       132        60
OIR    2025250     91400   20.1100 -113.8000      11.8       164       133        60
OIR    2025250     91400   20.1100 -113.8100      11.8       164       134        60
OIR    2025250     91400   20.1100 -113.8200      11.7       164       136        60
OIR    2025250     91400   20.1100 -113.8300      11.8       164       138        60
OIR    2025250     91400   20.1100 -113.8400      11.8       164       140        60
OIR    2025250     91400   20.1100 -116.1500      14.4       187       141        60
OIR    2025250     91400   20.1100 -116.1600      14.3       187       137        60
OIR    2025250     91400   20.1100 -116.1700      14.3       188       134        60
OIR    2025250     91400   20.1100 -116.1800      14.3       188       133        60
OIR    2025250     91400   20.1100 -116.1900      14.3       188       133        60
OIR    2025250     91400   20.1100 -116.2000      14.4       188       133        60
OIR    2025250     91400   20.1100 -116.2100      14.4       189       135        60
OIR    2025250     91400   20.1100 -116.2200      14.4       189       136        60
OIR    2025250     91400   20.1100 -116.2300      14.5       190       136        60
OIR    2025250     91400   20.1100 -116.2400      14.7       192       135        60
OIR    2025250     91400   20.1100 -116.2500      14.9       193       135        60
OIR    2025250     91400   20.1100 -116.2600      14.9       193       134        60
OIR    2025250     91400   20.1100 -116.2700      15.1       193       141        60
OIR    2025250     91400   20.1000 -109.9000       9.5        72       138        60
OIR    2025250     91400   20.1000 -109.9100       9.3        71       139        60
OIR    2025250     91400   20.1000 -109.9200       9.1        70       142        60
OIR    2025250     91400   20.1000 -113.1600      12.1       129       139        60
OIR    2025250     91400   20.1000 -113.2800       9.6       146       139        60
OIR    2025250     91400   20.1000 -113.2900       9.7       147       138        60
OIR    2025250     91400   20.1000 -113.3000       9.9       148       137        60
OIR    2025250     91400   20.1000 -113.3100      10.1       148       136        60
OIR    2025250     91400   20.1000 -113.3200      10.2       149       136        60
OIR    2025250     91400   20.1000 -113.3300      10.2       150       136        60
OIR    2025250     91400   20.1000 -113.3400      10.1       150       135        60
OIR    2025250     91400   20.1000 -113.3500      10.0       149       135        60
OIR    2025250     91400   20.1000 -113.3600       9.9       150       136        60
OIR    2025250     91400   20.1000 -113.3700      10.0       150       138        60
OIR    2025250     91400   20.1000 -113.3800      10.2       151       139        60
OIR    2025250     91400   20.1000 -113.3900      10.4       151       138        60
OIR    2025250     91400   20.1000 -113.4000      10.6       152       137        60
OIR    2025250     91400   20.1000 -113.4100      11.1       153       136        60
OIR    2025250     91400   20.1000 -113.4200      11.8       154       135        60
OIR    2025250     91400   20.1000 -113.4300      12.3       155       134        60
OIR    2025250     91400   20.1000 -113.4400      12.6       157       134        60
OIR    2025250     91400   20.1000 -113.4500      12.7       157       133        60
OIR    2025250     91400   20.1000 -113.4600      12.8       158       133        60
OIR    2025250     91400   20.1000 -113.4700      12.9       159       132        60
OIR    2025250     91400   20.1000 -113.4800      13.0       160       132        60
OIR    2025250     91400   20.1000 -113.4900      13.2       161       132        60
OIR    2025250     91400   20.1000 -113.5000      13.5       162       132        60
OIR    2025250     91400   20.1000 -113.5100      13.7       162       133        60
OIR    2025250     91400   20.1000 -113.5200      13.8       162       133        60
OIR    2025250     91400   20.1000 -113.5300      13.8       162       133        60
OIR    2025250     91400   20.1000 -113.5400      13.8       162       132        60
OIR    2025250     91400   20.1000 -113.5500      13.8       161       132        60
OIR    2025250     91400   20.1000 -113.5600      13.8       161       131        60
OIR    2025250     91400   20.1000 -113.5700      13.8       161       131        60
OIR    2025250     91400   20.1000 -113.5800      13.7       160       131        60
OIR    2025250     91400   20.1000 -113.5900      13.7       160       132        60
OIR    2025250     91400   20.1000 -113.6000      13.6       160       132        60
OIR    2025250     91400   20.1000 -113.6100      13.4       160       132        60
OIR    2025250     91400   20.1000 -113.6200      13.1       161       132        60
OIR    2025250     91400   20.1000 -113.6300      13.0       161       133        60
OIR    2025250     91400   20.1000 -113.6400      12.9       161       136        60
OIR    2025250     91400   20.1000 -113.6900      12.9       161       137        60
OIR    2025250     91400   20.1000 -113.7000      13.0       162       135        60
OIR    2025250     91400   20.1000 -113.7100      13.0       162       134        60
OIR    2025250     91400   20.1000 -113.7200      13.0       162       133        60
OIR    2025250     91400   20.1000 -113.7300      13.0       163       133        60
OIR    2025250     91400   20.1000 -113.7400      12.9       163       132        60
OIR    2025250     91400   20.1000 -113.7500      12.9       163       132        60
OIR    2025250     91400   20.1000 -113.7600      12.7       163       133        60
OIR    2025250     91400   20.1000 -113.7700      12.4       163       133        60
OIR    2025250     91400   20.1000 -113.7800      11.9       164       132        60
OIR    2025250     91400   20.1000 -113.7900      11.8       164       130        60
OIR    2025250     91400   20.1000 -113.8000      11.8       164       132        60
OIR    2025250     91400   20.1000 -113.8100      11.7       164       133        60
OIR    2025250     91400   20.1000 -113.8200      11.7       164       135        60
OIR    2025250     91400   20.1000 -113.8300      11.7       164       137        60
OIR    2025250     91400   20.1000 -113.8400      11.6       164       139        60
OIR    2025250     91400   20.1000 -116.1400      14.3       187       142        60
OIR    2025250     91400   20.1000 -116.1500      14.3       187       141        60
OIR    2025250     91400   20.1000 -116.1600      14.3       187       137        60
OIR    2025250     91400   20.1000 -116.1700      14.3       188       133        60
OIR    2025250     91400   20.1000 -116.1800      14.3       188       133        60
OIR    2025250     91400   20.1000 -116.1900      14.3       188       132        60
OIR    2025250     91400   20.1000 -116.2000      14.3       188       133        60
OIR    2025250     91400   20.1000 -116.2100      14.3       188       133        60
OIR    2025250     91400   20.1000 -116.2200      14.3       189       134        60
OIR    2025250     91400   20.1000 -116.2300      14.4       189       136        60
OIR    2025250     91400   20.1000 -116.2400      14.5       191       138        60
OIR    2025250     91400   20.1000 -116.2500      14.8       192       137        60
OIR    2025250     91400   20.1000 -116.2600      14.9       193       136        60
OIR    2025250     91400   20.1000 -116.2700      14.9       192       138        60
OIR    2025250     91400   20.0900 -109.9100       9.4        72       141        60
OIR    2025250     91400   20.0900 -113.1200      13.9       136       139        60
OIR    2025250     91400   20.0900 -113.1300      12.9       132       138        60
OIR    2025250     91400   20.0900 -113.1400      12.4       130       137        60
OIR    2025250     91400   20.0900 -113.1500      12.1       129       137        60
OIR    2025250     91400   20.0900 -113.1600      12.0       129       137        60
OIR    2025250     91400   20.0900 -113.1700      11.9       130       138        60
OIR    2025250     91400   20.0900 -113.2600       9.3       146       138        60
OIR    2025250     91400   20.0900 -113.2700       9.2       147       138        60
OIR    2025250     91400   20.0900 -113.2800       9.1       149       137        60
OIR    2025250     91400   20.0900 -113.2900       9.2       149       136        60
OIR    2025250     91400   20.0900 -113.3000       9.4       150       135        60
OIR    2025250     91400   20.0900 -113.3100       9.5       151       134        60
OIR    2025250     91400   20.0900 -113.3200       9.7       151       133        60
OIR    2025250     91400   20.0900 -113.3300       9.8       151       133        60
OIR    2025250     91400   20.0900 -113.3400       9.7       151       132        60
OIR    2025250     91400   20.0900 -113.3500       9.6       151       131        60
OIR    2025250     91400   20.0900 -113.3600       9.7       151       132        60
OIR    2025250     91400   20.0900 -113.3700       9.8       151       134        60
OIR    2025250     91400   20.0900 -113.3800       9.9       152       135        60
OIR    2025250     91400   20.0900 -113.3900      10.1       152       134        60
OIR    2025250     91400   20.0900 -113.4000      10.3       153       134        60
OIR    2025250     91400   20.0900 -113.4100      10.6       154       133        60
OIR    2025250     91400   20.0900 -113.4200      11.0       155       132        60
OIR    2025250     91400   20.0900 -113.4300      11.5       156       131        60
OIR    2025250     91400   20.0900 -113.4400      11.9       157       131        60
OIR    2025250     91400   20.0900 -113.4500      12.2       158       131        60
OIR    2025250     91400   20.0900 -113.4600      12.3       159       130        60
OIR    2025250     91400   20.0900 -113.4700      12.4       160       130        60
OIR    2025250     91400   20.0900 -113.4800      12.5       161       130        60
OIR    2025250     91400   20.0900 -113.4900      12.6       161       130        60
OIR    2025250     91400   20.0900 -113.5000      12.8       162       130        60
OIR    2025250     91400   20.0900 -113.5100      13.2       162       129        60
OIR    2025250     91400   20.0900 -113.5200      13.5       162       129        60
OIR    2025250     91400   20.0900 -113.5300      13.7       162       129        60
OIR    2025250     91400   20.0900 -113.5400      13.8       162       129        60
OIR    2025250     91400   20.0900 -113.5500      13.8       161       129        60
OIR    2025250     91400   20.0900 -113.5600      13.7       161       129        60
OIR    2025250     91400   20.0900 -113.5700      13.7       161       129        60
OIR    2025250     91400   20.0900 -113.5800      13.6       161       129        60
OIR    2025250     91400   20.0900 -113.5900      13.5       160       129        60
OIR    2025250     91400   20.0900 -113.6000      13.3       160       130        60
OIR    2025250     91400   20.0900 -113.6100      13.1       161       130        60
OIR    2025250     91400   20.0900 -113.6200      13.0       161       131        60
OIR    2025250     91400   20.0900 -113.6300      12.9       161       131        60
OIR    2025250     91400   20.0900 -113.6400      12.9       161       133        60
OIR    2025250     91400   20.0900 -113.6500      12.9       161       136        60
OIR    2025250     91400   20.0900 -113.6600      12.9       161       136        60
OIR    2025250     91400   20.0900 -113.6700      12.9       161       136        60
OIR    2025250     91400   20.0900 -113.6800      12.9       161       136        60
OIR    2025250     91400   20.0900 -113.6900      12.9       162       134        60
OIR    2025250     91400   20.0900 -113.7000      12.9       162       133        60
OIR    2025250     91400   20.0900 -113.7100      12.9       162       133        60
OIR    2025250     91400   20.0900 -113.7200      12.9       162       133        60
OIR    2025250     91400   20.0900 -113.7300      12.9       163       133        60
OIR    2025250     91400   20.0900 -113.7400      12.9       163       132        60
OIR    2025250     91400   20.0900 -113.7500      12.9       163       132        60
OIR    2025250     91400   20.0900 -113.7600      12.8       163       132        60
OIR    2025250     91400   20.0900 -113.7700      12.6       163       133        60
OIR    2025250     91400   20.0900 -113.7800      12.0       164       131        60
OIR    2025250     91400   20.0900 -113.7900      11.8       164       129        60
OIR    2025250     91400   20.0900 -113.8000      11.8       164       130        60
OIR    2025250     91400   20.0900 -113.8100      11.7       164       131        60
OIR    2025250     91400   20.0900 -113.8200      11.7       164       133        60
OIR    2025250     91400   20.0900 -113.8300      11.6       164       135        60
OIR    2025250     91400   20.0900 -113.8400      11.4       164       137        60
OIR    2025250     91400   20.0900 -113.8500      11.2       164       138        60
OIR    2025250     91400   20.0900 -113.8600      11.0       164       139        60
OIR    2025250     91400   20.0900 -116.1400      14.3       187       141        60
OIR    2025250     91400   20.0900 -116.1500      14.3       187       140        60
OIR    2025250     91400   20.0900 -116.1600      14.3       187       137        60
OIR    2025250     91400   20.0900 -116.1700      14.3       187       133        60
OIR    2025250     91400   20.0900 -116.1800      14.3       188       132        60
OIR    2025250     91400   20.0900 -116.1900      14.3       188       132        60
OIR    2025250     91400   20.0900 -116.2000      14.3       188       132        60
OIR    2025250     91400   20.0900 -116.2100      14.3       188       132        60
OIR    2025250     91400   20.0900 -116.2200      14.3       188       133        60
OIR    2025250     91400   20.0900 -116.2300      14.3       188       137        60
OIR    2025250     91400   20.0900 -116.2400      14.3       189       140        60
OIR    2025250     91400   20.0900 -116.2500      14.5       191       139        60
OIR    2025250     91400   20.0900 -116.2600      14.4       192       137        60
OIR    2025250     91400   20.0900 -116.2700      14.2       192       137        60
OIR    2025250     91400   20.0900 -116.2800      14.7       197       141        60
OIR    2025250     91400   20.0800 -109.9100       9.5        72       140        60
OIR    2025250     91400   20.0800 -109.9200       9.3        72       142        60
OIR    2025250     91400   20.0800 -112.9400      12.0       141       138        60
OIR    2025250     91400   20.0800 -112.9500      11.6       140       138        60
OIR    2025250     91400   20.0800 -112.9600      11.6       140       138        60
OIR    2025250     91400   20.0800 -113.0700      15.3       140       139        60
OIR    2025250     91400   20.0800 -113.0800      15.3       140       138        60
OIR    2025250     91400   20.0800 -113.0900      15.0       140       137        60
OIR    2025250     91400   20.0800 -113.1000      14.6       139       135        60
OIR    2025250     91400   20.0800 -113.1100      14.1       138       135        60
OIR    2025250     91400   20.0800 -113.1200      13.5       136       135        60
OIR    2025250     91400   20.0800 -113.1300      12.7       133       135        60
OIR    2025250     91400   20.0800 -113.1400      12.2       131       134        60
OIR    2025250     91400   20.0800 -113.1500      12.0       130       134        60
OIR    2025250     91400   20.0800 -113.1600      11.9       130       135        60
OIR    2025250     91400   20.0800 -113.1700      11.9       130       136        60
OIR    2025250     91400   20.0800 -113.1800      11.8       130       138        60
OIR    2025250     91400   20.0800 -113.2400       9.3       144       139        60
OIR    2025250     91400   20.0800 -113.2500       9.0       147       137        60
OIR    2025250     91400   20.0800 -113.2600       8.9       149       136        60
OIR    2025250     91400   20.0800 -113.2700       8.9       151       135        60
OIR    2025250     91400   20.0800 -113.2800       8.9       151       134        60
OIR    2025250     91400   20.0800 -113.2900       9.0       151       133        60
OIR    2025250     91400   20.0800 -113.3000       9.1       152       132        60
OIR    2025250     91400   20.0800 -113.3100       9.2       152       132        60
OIR    2025250     91400   20.0800 -113.3200       9.3       153       131        60
OIR    2025250     91400   20.0800 -113.3300       9.4       153       130        60
OIR    2025250     91400   20.0800 -113.3400       9.4       153       130        60
OIR    2025250     91400   20.0800 -113.3500       9.4       153       129        60
OIR    2025250     91400   20.0800 -113.3600       9.5       152       130        60
OIR    2025250     91400   20.0800 -113.3700       9.6       153       130        60
OIR    2025250     91400   20.0800 -113.3800       9.7       153       131        60
OIR    2025250     91400   20.0800 -113.3900       9.9       153       131        60
OIR    2025250     91400   20.0800 -113.4000      10.1       154       131        60
OIR    2025250     91400   20.0800 -113.4100      10.4       155       130        60
OIR    2025250     91400   20.0800 -113.4200      10.7       156       129        60
OIR    2025250     91400   20.0800 -113.4300      11.1       157       128        60
OIR    2025250     91400   20.0800 -113.4400      11.5       158       129        60
OIR    2025250     91400   20.0800 -113.4500      11.8       159       129        60
OIR    2025250     91400   20.0800 -113.4600      12.0       159       129        60
OIR    2025250     91400   20.0800 -113.4700      12.2       160       128        60
OIR    2025250     91400   20.0800 -113.4800      12.3       161       129        60
OIR    2025250     91400   20.0800 -113.4900      12.5       161       129        60
OIR    2025250     91400   20.0800 -113.5000      12.6       162       129        60
OIR    2025250     91400   20.0800 -113.5100      12.7       162       129        60
OIR    2025250     91400   20.0800 -113.5200      13.1       162       129        60
OIR    2025250     91400   20.0800 -113.5300      13.3       162       128        60
OIR    2025250     91400   20.0800 -113.5400      13.4       162       128        60
OIR    2025250     91400   20.0800 -113.5500      13.4       162       128        60
OIR    2025250     91400   20.0800 -113.5600      13.4       161       129        60
OIR    2025250     91400   20.0800 -113.5700      13.3       161       129        60
OIR    2025250     91400   20.0800 -113.5800      13.2       161       130        60
OIR    2025250     91400   20.0800 -113.5900      13.2       161       130        60
OIR    2025250     91400   20.0800 -113.6000      13.1       161       130        60
OIR    2025250     91400   20.0800 -113.6100      13.0       161       130        60
OIR    2025250     91400   20.0800 -113.6200      12.9       161       130        60
OIR    2025250     91400   20.0800 -113.6300      12.9       161       130        60
OIR    2025250     91400   20.0800 -113.6400      12.9       161       132        60
OIR    2025250     91400   20.0800 -113.6500      12.9       161       133        60
OIR    2025250     91400   20.0800 -113.6600      12.9       161       133        60
OIR    2025250     91400   20.0800 -113.6700      12.9       161       133        60
OIR    2025250     91400   20.0800 -113.6800      12.9       161       133        60
OIR    2025250     91400   20.0800 -113.6900      12.9       162       132        60
OIR    2025250     91400   20.0800 -113.7000      12.9       162       132        60
OIR    2025250     91400   20.0800 -113.7100      12.9       162       132        60
OIR    2025250     91400   20.0800 -113.7200      12.9       162       132        60
OIR    2025250     91400   20.0800 -113.7300      12.9       163       132        60
OIR    2025250     91400   20.0800 -113.7400      12.9       163       132        60
OIR    2025250     91400   20.0800 -113.7500      12.9       163       132        60
OIR    2025250     91400   20.0800 -113.7600      12.9       163       132        60
OIR    2025250     91400   20.0800 -113.7700      12.7       163       132        60
OIR    2025250     91400   20.0800 -113.7800      12.1       164       130        60
OIR    2025250     91400   20.0800 -113.7900      11.9       164       129        60
OIR    2025250     91400   20.0800 -113.8000      11.7       164       128        60
OIR    2025250     91400   20.0800 -113.8100      11.7       164       129        60
OIR    2025250     91400   20.0800 -113.8200      11.6       164       131        60
OIR    2025250     91400   20.0800 -113.8300      11.5       164       133        60
OIR    2025250     91400   20.0800 -113.8400      11.3       164       134        60
OIR    2025250     91400   20.0800 -113.8500      11.0       164       136        60
OIR    2025250     91400   20.0800 -113.8600      10.8       165       137        60
OIR    2025250     91400   20.0800 -113.8700      10.7       165       138        60
OIR    2025250     91400   20.0800 -113.8800      10.5       165       139        60
OIR    2025250     91400   20.0800 -116.1300      14.3       186       141        60
OIR    2025250     91400   20.0800 -116.1400      14.3       187       140        60
OIR    2025250     91400   20.0800 -116.1500      14.3       187       138        60
OIR    2025250     91400   20.0800 -116.1600      14.3       187       137        60
OIR    2025250     91400   20.0800 -116.1700      14.3       187       135        60
OIR    2025250     91400   20.0800 -116.1800      14.3       188       134        60
OIR    2025250     91400   20.0800 -116.1900      14.3       188       133        60
OIR    2025250     91400   20.0800 -116.2000      14.3       188       133        60
OIR    2025250     91400   20.0800 -116.2100      14.2       188       132        60
OIR    2025250     91400   20.0800 -116.2200      14.2       188       132        60
OIR    2025250     91400   20.0800 -116.2300      14.2       188       135        60
OIR    2025250     91400   20.0800 -116.2400      14.2       188       138        60
OIR    2025250     91400   20.0800 -116.2500      14.1       189       137        60
OIR    2025250     91400   20.0800 -116.2600      14.0       190       136        60
OIR    2025250     91400   20.0800 -116.2700      13.7       191       137        60
OIR    2025250     91400   20.0800 -116.2800      13.3       191       140        60
OIR    2025250     91400   20.0700 -109.8900      10.1        73       141        60
OIR    2025250     91400   20.0700 -109.9000       9.8        73       140        60
OIR    2025250     91400   20.0700 -109.9100       9.6        73       139        60
OIR    2025250     91400   20.0700 -109.9200       9.4        72       140        60
OIR    2025250     91400   20.0700 -109.9300       9.1        72       142        60
OIR    2025250     91400   20.0700 -112.9300      12.8       140       139        60
OIR    2025250     91400   20.0700 -112.9400      11.8       140       137        60
OIR    2025250     91400   20.0700 -112.9500      11.6       140       137        60
OIR    2025250     91400   20.0700 -112.9600      11.5       140       137        60
OIR    2025250     91400   20.0700 -112.9700      11.5       140       138        60
OIR    2025250     91400   20.0700 -112.9800      11.4       139       139        60
OIR    2025250     91400   20.0700 -112.9900      11.4       139       139        60
OIR    2025250     91400   20.0700 -113.0000      11.8       139       138        60
OIR    2025250     91400   20.0700 -113.0100      13.4       141       136        60
OIR    2025250     91400   20.0700 -113.0200      14.5       143       136        60
OIR    2025250     91400   20.0700 -113.0300      14.8       142       135        60
OIR    2025250     91400   20.0700 -113.0400      14.8       142       136        60
OIR    2025250     91400   20.0700 -113.0500      14.9       141       136        60
OIR    2025250     91400   20.0700 -113.0600      15.1       141       137        60
OIR    2025250     91400   20.0700 -113.0700      15.2       140       136        60
OIR    2025250     91400   20.0700 -113.0800      15.0       140       136        60
OIR    2025250     91400   20.0700 -113.0900      14.6       140       135        60
OIR    2025250     91400   20.0700 -113.1000      13.9       139       134        60
OIR    2025250     91400   20.0700 -113.1100      13.4       138       134        60
OIR    2025250     91400   20.0700 -113.1200      12.8       135       134        60
OIR    2025250     91400   20.0700 -113.1300      12.3       133       134        60
OIR    2025250     91400   20.0700 -113.1400      12.0       131       134        60
OIR    2025250     91400   20.0700 -113.1500      11.9       130       134        60
OIR    2025250     91400   20.0700 -113.1600      11.8       130       134        60
OIR    2025250     91400   20.0700 -113.1700      11.8       130       134        60
OIR    2025250     91400   20.0700 -113.1800      11.8       130       136        60
OIR    2025250     91400   20.0700 -113.1900      11.8       130       139        60
OIR    2025250     91400   20.0700 -113.2300       9.4       142       139        60
OIR    2025250     91400   20.0700 -113.2400       8.8       147       137        60
OIR    2025250     91400   20.0700 -113.2500       8.7       151       136        60
OIR    2025250     91400   20.0700 -113.2600       8.7       152       134        60
OIR    2025250     91400   20.0700 -113.2700       8.6       153       133        60
OIR    2025250     91400   20.0700 -113.2800       8.7       154       132        60
OIR    2025250     91400   20.0700 -113.2900       8.8       153       131        60
OIR    2025250     91400   20.0700 -113.3000       8.9       153       131        60
OIR    2025250     91400   20.0700 -113.3100       8.9       154       130        60
OIR    2025250     91400   20.0700 -113.3200       9.1       154       130        60
OIR    2025250     91400   20.0700 -113.3300       9.1       154       129        60
OIR    2025250     91400   20.0700 -113.3400       9.1       154       129        60
OIR    2025250     91400   20.0700 -113.3500       9.2       154       128        60
OIR    2025250     91400   20.0700 -113.3600       9.3       154       128        60
OIR    2025250     91400   20.0700 -113.3700       9.3       154       128        60
OIR    2025250     91400   20.0700 -113.3800       9.4       154       128        60
OIR    2025250     91400   20.0700 -113.3900       9.6       155       129        60
OIR    2025250     91400   20.0700 -113.4000       9.8       156       129        60
OIR    2025250     91400   20.0700 -113.4100      10.1       157       128        60
OIR    2025250     91400   20.0700 -113.4200      10.4       158       127        60
OIR    2025250     91400   20.0700 -113.4300      10.7       158       126        60
OIR    2025250     91400   20.0700 -113.4400      11.1       159       127        60
OIR    2025250     91400   20.0700 -113.4500      11.4       160       128        60
OIR    2025250     91400   20.0700 -113.4600      11.7       160       128        60
OIR    2025250     91400   20.0700 -113.4700      12.0       161       128        60
OIR    2025250     91400   20.0700 -113.4800      12.2       161       128        60
OIR    2025250     91400   20.0700 -113.4900      12.4       162       129        60
OIR    2025250     91400   20.0700 -113.5000      12.5       162       129        60
OIR    2025250     91400   20.0700 -113.5100      12.6       162       129        60
OIR    2025250     91400   20.0700 -113.5200      12.7       162       129        60
OIR    2025250     91400   20.0700 -113.5300      12.9       162       128        60
OIR    2025250     91400   20.0700 -113.5400      12.9       162       127        60
OIR    2025250     91400   20.0700 -113.5500      13.0       162       128        60
OIR    2025250     91400   20.0700 -113.5600      13.1       161       129        60
OIR    2025250     91400   20.0700 -113.5700      13.1       161       129        60
OIR    2025250     91400   20.0700 -113.5800      13.1       161       130        60
OIR    2025250     91400   20.0700 -113.5900      13.0       161       131        60
OIR    2025250     91400   20.0700 -113.6000      13.0       161       131        60
OIR    2025250     91400   20.0700 -113.6100      12.9       161       130        60
OIR    2025250     91400   20.0700 -113.6200      12.9       161       130        60
OIR    2025250     91400   20.0700 -113.6300      12.9       161       130        60
OIR    2025250     91400   20.0700 -113.6400      12.9       161       130        60
OIR    2025250     91400   20.0700 -113.6500      12.9       161       131        60
OIR    2025250     91400   20.0700 -113.6600      12.9       161       131        60
OIR    2025250     91400   20.0700 -113.6700      12.9       161       131        60
OIR    2025250     91400   20.0700 -113.6800      12.9       161       132        60
OIR    2025250     91400   20.0700 -113.6900      12.9       162       131        60
OIR    2025250     91400   20.0700 -113.7000      12.9       162       131        60
OIR    2025250     91400   20.0700 -113.7100      12.9       162       131        60
OIR    2025250     91400   20.0700 -113.7200      12.9       162       131        60
OIR    2025250     91400   20.0700 -113.7300      12.9       163       132        60
OIR    2025250     91400   20.0700 -113.7400      12.9       163       132        60
OIR    2025250     91400   20.0700 -113.7500      12.9       163       132        60
OIR    2025250     91400   20.0700 -113.7600      12.9       163       131        60
OIR    2025250     91400   20.0700 -113.7700      12.8       163       131        60
OIR    2025250     91400   20.0700 -113.7800      12.6       163       130        60
OIR    2025250     91400   20.0700 -113.7900      12.1       164       129        60
OIR    2025250     91400   20.0700 -113.8000      11.8       164       128        60
OIR    2025250     91400   20.0700 -113.8100      11.7       164       128        60
OIR    2025250     91400   20.0700 -113.8200      11.5       164       129        60
OIR    2025250     91400   20.0700 -113.8300      11.4       164       130        60
OIR    2025250     91400   20.0700 -113.8400      11.1       164       132        60
OIR    2025250     91400   20.0700 -113.8500      10.9       165       133        60
OIR    2025250     91400   20.0700 -113.8600      10.8       165       134        60
OIR    2025250     91400   20.0700 -113.8700      10.6       165       135        60
OIR    2025250     91400   20.0700 -113.8800      10.4       165       136        60
OIR    2025250     91400   20.0700 -113.8900      10.1       165       136        60
OIR    2025250     91400   20.0700 -113.9000       9.9       164       138        60
OIR    2025250     91400   20.0700 -113.9100       9.9       164       140        60
OIR    2025250     91400   20.0700 -116.1200      14.2       186       142        60
OIR    2025250     91400   20.0700 -116.1300      14.2       186       140        60
OIR    2025250     91400   20.0700 -116.1400      14.2       187       139        60
OIR    2025250     91400   20.0700 -116.1500      14.2       187       138        60
OIR    2025250     91400   20.0700 -116.1600      14.3       187       137        60
OIR    2025250     91400   20.0700 -116.1700      14.3       187       136        60
OIR    2025250     91400   20.0700 -116.1800      14.2       187       136        60
OIR    2025250     91400   20.0700 -116.1900      14.2       188       135        60
OIR    2025250     91400   20.0700 -116.2000      14.2       188       134        60
OIR    2025250     91400   20.0700 -116.2100      14.2       188       133        60
OIR    2025250     91400   20.0700 -116.2200      14.2       188       132        60
OIR    2025250     91400   20.0700 -116.2300      14.2       188       133        60
OIR    2025250     91400   20.0700 -116.2400      14.1       188       135        60
OIR    2025250     91400   20.0700 -116.2500      14.0       188       135        60
OIR    2025250     91400   20.0700 -116.2600      13.8       189       135        60
OIR    2025250     91400   20.0700 -116.2700      13.5       190       136        60
OIR    2025250     91400   20.0700 -116.2800      12.9       190       140        60
OIR    2025250     91400   20.0600 -109.8900      10.2        73       139        60
OIR    2025250     91400   20.0600 -109.9000       9.9        74       139        60
OIR    2025250     91400   20.0600 -109.9100       9.7        74       139        60
OIR    2025250     91400   20.0600 -109.9200       9.5        74       140        60
OIR    2025250     91400   20.0600 -109.9300       9.2        73       141        60
OIR    2025250     91400   20.0600 -109.9400       8.9        72       142        60
OIR    2025250     91400   20.0600 -112.9300      11.9       140       138        60
OIR    2025250     91400   20.0600 -112.9400      11.5       139       136        60
OIR    2025250     91400   20.0600 -112.9500      11.4       139       137        60
OIR    2025250     91400   20.0600 -112.9600      11.4       139       137        60
OIR    2025250     91400   20.0600 -112.9700      11.4       139       137        60
OIR    2025250     91400   20.0600 -112.9800      11.3       139       138        60
OIR    2025250     91400   20.0600 -112.9900      11.3       139       138        60
OIR    2025250     91400   20.0600 -113.0000      11.4       139       136        60
OIR    2025250     91400   20.0600 -113.0100      11.8       139       134        60
OIR    2025250     91400   20.0600 -113.0200      12.7       141       134        60
OIR    2025250     91400   20.0600 -113.0300      13.1       141       133        60
OIR    2025250     91400   20.0600 -113.0400      13.1       140       133        60
OIR    2025250     91400   20.0600 -113.0500      12.0       139       134        60
OIR    2025250     91400   20.0600 -113.0600      11.0       138       134        60
OIR    2025250     91400   20.0600 -113.0700      10.6       137       134        60
OIR    2025250     91400   20.0600 -113.0800      10.8       138       134        60
OIR    2025250     91400   20.0600 -113.0900      10.8       137       134        60
OIR    2025250     91400   20.0600 -113.1000      11.1       137       134        60
OIR    2025250     91400   20.0600 -113.1100      11.6       136       133        60
OIR    2025250     91400   20.0600 -113.1200      11.7       135       133        60
OIR    2025250     91400   20.0600 -113.1300      11.7       133       133        60
OIR    2025250     91400   20.0600 -113.1400      11.7       132       133        60
OIR    2025250     91400   20.0600 -113.1500      11.7       131       133        60
OIR    2025250     91400   20.0600 -113.1600      11.8       130       134        60
OIR    2025250     91400   20.0600 -113.1700      11.8       130       134        60
OIR    2025250     91400   20.0600 -113.1800      11.8       130       135        60
OIR    2025250     91400   20.0600 -113.1900      11.8       130       137        60
OIR    2025250     91400   20.0600 -113.2000      11.8       131       139        60
OIR    2025250     91400   20.0600 -113.2100      11.6       132       139        60
OIR    2025250     91400   20.0600 -113.2200      10.2       138       139        60
OIR    2025250     91400   20.0600 -113.2300       8.9       148       137        60
OIR    2025250     91400   20.0600 -113.2400       8.6       152       136        60
OIR    2025250     91400   20.0600 -113.2500       8.5       154       134        60
OIR    2025250     91400   20.0600 -113.2600       8.5       155       132        60
OIR    2025250     91400   20.0600 -113.2700       8.5       155       131        60
OIR    2025250     91400   20.0600 -113.2800       8.6       155       131        60
OIR    2025250     91400   20.0600 -113.2900       8.6       155       130        60
OIR    2025250     91400   20.0600 -113.3000       8.7       155       130        60
OIR    2025250     91400   20.0600 -113.3100       8.8       155       129        60
OIR    2025250     91400   20.0600 -113.3200       8.9       155       129        60
OIR    2025250     91400   20.0600 -113.3300       9.0       155       129        60
OIR    2025250     91400   20.0600 -113.3400       9.0       155       129        60
OIR    2025250     91400   20.0600 -113.3500       9.0       155       128        60
OIR    2025250     91400   20.0600 -113.3600       9.0       155       128        60
OIR    2025250     91400   20.0600 -113.3700       9.1       155       128        60
OIR    2025250     91400   20.0600 -113.3800       9.2       156       128        60
OIR    2025250     91400   20.0600 -113.3900       9.3       157       128        60
OIR    2025250     91400   20.0600 -113.4000       9.5       157       128        60
OIR    2025250     91400   20.0600 -113.4100       9.7       158       128        60
OIR    2025250     91400   20.0600 -113.4200      10.0       159       128        60
OIR    2025250     91400   20.0600 -113.4300      10.3       159       127        60
OIR    2025250     91400   20.0600 -113.4400      10.7       160       127        60
OIR    2025250     91400   20.0600 -113.4500      11.1       160       128        60
OIR    2025250     91400   20.0600 -113.4600      11.5       161       128        60
OIR    2025250     91400   20.0600 -113.4700      11.8       161       128        60
OIR    2025250     91400   20.0600 -113.4800      12.1       162       128        60
OIR    2025250     91400   20.0600 -113.4900      12.3       162       128        60
OIR    2025250     91400   20.0600 -113.5000      12.4       162       128        60
OIR    2025250     91400   20.0600 -113.5100      12.5       162       128        60
OIR    2025250     91400   20.0600 -113.5200      12.6       162       129        60
OIR    2025250     91400   20.0600 -113.5300      12.6       162       128        60
OIR    2025250     91400   20.0600 -113.5400      12.7       162       128        60
OIR    2025250     91400   20.0600 -113.5500      12.8       162       128        60
OIR    2025250     91400   20.0600 -113.5600      12.9       162       129        60
OIR    2025250     91400   20.0600 -113.5700      12.9       161       129        60
OIR    2025250     91400   20.0600 -113.5800      12.9       161       129        60
OIR    2025250     91400   20.0600 -113.5900      12.9       161       129        60
OIR    2025250     91400   20.0600 -113.6000      12.9       161       129        60
OIR    2025250     91400   20.0600 -113.6100      12.9       161       129        60
OIR    2025250     91400   20.0600 -113.6200      12.9       161       129        60
OIR    2025250     91400   20.0600 -113.6300      12.9       161       129        60
OIR    2025250     91400   20.0600 -113.6400      12.9       161       129        60
OIR    2025250     91400   20.0600 -113.6500      12.9       161       130        60
OIR    2025250     91400   20.0600 -113.6600      12.9       161       130        60
OIR    2025250     91400   20.0600 -113.6700      12.9       161       130        60
OIR    2025250     91400   20.0600 -113.6800      12.9       162       130        60
OIR    2025250     91400   20.0600 -113.6900      12.9       162       130        60
OIR    2025250     91400   20.0600 -113.7000      12.9       162       129        60
OIR    2025250     91400   20.0600 -113.7100      12.9       162       129        60
OIR    2025250     91400   20.0600 -113.7200      12.9       162       129        60
OIR    2025250     91400   20.0600 -113.7300      12.9       162       130        60
OIR    2025250     91400   20.0600 -113.7400      12.9       163       130        60
OIR    2025250     91400   20.0600 -113.7500      12.9       163       130        60
OIR    2025250     91400   20.0600 -113.7600      12.9       163       129        60
OIR    2025250     91400   20.0600 -113.7700      12.9       163       129        60
OIR    2025250     91400   20.0600 -113.7800      12.8       163       128        60
OIR    2025250     91400   20.0600 -113.7900      12.5       164       128        60
OIR    2025250     91400   20.0600 -113.8000      11.9       164       127        60
OIR    2025250     91400   20.0600 -113.8100      11.7       165       127        60
OIR    2025250     91400   20.0600 -113.8200      11.5       165       127        60
OIR    2025250     91400   20.0600 -113.8300      11.1       165       128        60
OIR    2025250     91400   20.0600 -113.8400      10.9       165       130        60
OIR    2025250     91400   20.0600 -113.8500      10.8       165       131        60
OIR    2025250     91400   20.0600 -113.8600      10.6       165       132        60
OIR    2025250     91400   20.0600 -113.8700      10.5       165       132        60
OIR    2025250     91400   20.0600 -113.8800      10.3       165       132        60
OIR    2025250     91400   20.0600 -113.8900      10.1       165       133        60
OIR    2025250     91400   20.0600 -113.9000       9.9       165       133        60
OIR    2025250     91400   20.0600 -113.9100       9.8       165       134        60
OIR    2025250     91400   20.0600 -113.9200       9.8       165       136        60
OIR    2025250     91400   20.0600 -113.9300       9.9       165       139        60
OIR    2025250     91400   20.0600 -113.9600      10.5       167       140        60
OIR    2025250     91400   20.0600 -113.9700      10.5       168       138        60
OIR    2025250     91400   20.0600 -113.9800      10.2       170       137        60
OIR    2025250     91400   20.0600 -113.9900      10.1       172       136        60
OIR    2025250     91400   20.0600 -114.0000      10.0       173       136        60
OIR    2025250     91400   20.0600 -114.0100      10.1       174       136        60
OIR    2025250     91400   20.0600 -114.0200      10.2       176       135        60
OIR    2025250     91400   20.0600 -114.0300      10.2       177       135        60
OIR    2025250     91400   20.0600 -114.0400      10.2       178       138        60
OIR    2025250     91400   20.0600 -114.0500      10.3       180       140        60
OIR    2025250     91400   20.0600 -114.0600      10.3       181       140        60
OIR    2025250     91400   20.0600 -114.0700      10.4       183       139        60
OIR    2025250     91400   20.0600 -114.0800      10.5       184       138        60
OIR    2025250     91400   20.0600 -114.0900      10.7       185       136        60
OIR    2025250     91400   20.0600 -114.1000      11.0       186       136        60
OIR    2025250     91400   20.0600 -114.1100      11.4       188       136        60
OIR    2025250     91400   20.0600 -114.1200      12.0       190       136        60
OIR    2025250     91400   20.0600 -114.1300      12.2       192       137        60
OIR    2025250     91400   20.0600 -114.1400      12.3       195       138        60
OIR    2025250     91400   20.0600 -116.1200      14.2       186       142        60
OIR    2025250     91400   20.0600 -116.1300      14.2       186       140        60
OIR    2025250     91400   20.0600 -116.1400      14.2       186       139        60
OIR    2025250     91400   20.0600 -116.1500      14.2       187       138        60
OIR    2025250     91400   20.0600 -116.1600      14.2       187       137        60
OIR    2025250     91400   20.0600 -116.1700      14.2       187       136        60
OIR    2025250     91400   20.0600 -116.1800      14.2       187       135        60
OIR    2025250     91400   20.0600 -116.1900      14.2       187       135        60
OIR    2025250     91400   20.0600 -116.2000      14.2       188       134        60
OIR    2025250     91400   20.0600 -116.2100      14.2       188       134        60
OIR    2025250     91400   20.0600 -116.2200      14.2       188       134        60
OIR    2025250     91400   20.0600 -116.2300      14.2       188       134        60
OIR    2025250     91400   20.0600 -116.2400      14.1       188       136        60
OIR    2025250     91400   20.0600 -116.2500      14.0       188       137        60
OIR    2025250     91400   20.0600 -116.2600      13.8       188       138        60
OIR    2025250     91400   20.0600 -116.2700      13.2       189       139        60
OIR    2025250     91400   20.0500 -109.8800      11.1        71       141        60
OIR    2025250     91400   20.0500 -109.8900      10.4        74       138        60
OIR    2025250     91400   20.0500 -109.9000      10.0        75       138        60
OIR    2025250     91400   20.0500 -109.9100       9.8        76       139        60
OIR    2025250     91400   20.0500 -109.9200       9.5        76       139        60
OIR    2025250     91400   20.0500 -109.9300       9.2        76       140        60
OIR    2025250     91400   20.0500 -109.9400       8.9        75       141        60
OIR    2025250     91400   20.0500 -109.9500       8.7        73       141        60
OIR    2025250     91400   20.0500 -109.9600       8.6        71       142        60
OIR    2025250     91400   20.0500 -112.9000      14.1       139       137        60
OIR    2025250     91400   20.0500 -112.9100      13.4       139       137        60
OIR    2025250     91400   20.0500 -112.9200      12.2       140       138        60
OIR    2025250     91400   20.0500 -112.9300      11.5       139       137        60
OIR    2025250     91400   20.0500 -112.9400      11.4       139       136        60
OIR    2025250     91400   20.0500 -112.9500      11.3       139       137        60
OIR    2025250     91400   20.0500 -112.9600      11.2       139       137        60
OIR    2025250     91400   20.0500 -112.9700      11.2       139       137        60
OIR    2025250     91400   20.0500 -112.9800      11.2       139       137        60
OIR    2025250     91400   20.0500 -112.9900      11.2       139       138        60
OIR    2025250     91400   20.0500 -113.0000      11.2       139       136        60
OIR    2025250     91400   20.0500 -113.0100      11.3       139       134        60
OIR    2025250     91400   20.0500 -113.0200      11.5       139       133        60
OIR    2025250     91400   20.0500 -113.0300      11.7       140       132        60
OIR    2025250     91400   20.0500 -113.0400      11.2       139       132        60
OIR    2025250     91400   20.0500 -113.0500      10.6       138       133        60
OIR    2025250     91400   20.0500 -113.0600      10.4       138       134        60
OIR    2025250     91400   20.0500 -113.0700      10.3       137       134        60
OIR    2025250     91400   20.0500 -113.0800      10.4       138       134        60
OIR    2025250     91400   20.0500 -113.0900      10.5       137       134        60
OIR    2025250     91400   20.0500 -113.1000      10.6       137       134        60
OIR    2025250     91400   20.0500 -113.1100      10.9       136       134        60
OIR    2025250     91400   20.0500 -113.1200      11.1       135       134        60
OIR    2025250     91400   20.0500 -113.1300      11.2       134       134        60
OIR    2025250     91400   20.0500 -113.1400      11.4       132       134        60
OIR    2025250     91400   20.0500 -113.1500      11.5       131       134        60
OIR    2025250     91400   20.0500 -113.1600      11.7       131       134        60
OIR    2025250     91400   20.0500 -113.1700      11.7       130       134        60
OIR    2025250     91400   20.0500 -113.1800      11.8       131       135        60
OIR    2025250     91400   20.0500 -113.1900      11.8       131       136        60
OIR    2025250     91400   20.0500 -113.2000      11.6       132       137        60
OIR    2025250     91400   20.0500 -113.2100      11.0       135       137        60
OIR    2025250     91400   20.0500 -113.2200       9.5       146       137        60
OIR    2025250     91400   20.0500 -113.2300       8.7       154       136        60
OIR    2025250     91400   20.0500 -113.2400       8.6       156       136        60
OIR    2025250     91400   20.0500 -113.2500       8.5       157       135        60
OIR    2025250     91400   20.0500 -113.2600       8.5       157       133        60
OIR    2025250     91400   20.0500 -113.2700       8.5       157       131        60
OIR    2025250     91400   20.0500 -113.2800       8.6       156       130        60
OIR    2025250     91400   20.0500 -113.2900       8.6       156       130        60
OIR    2025250     91400   20.0500 -113.3000       8.7       156       130        60
OIR    2025250     91400   20.0500 -113.3100       8.8       156       129        60
OIR    2025250     91400   20.0500 -113.3200       8.8       156       129        60
OIR    2025250     91400   20.0500 -113.3300       8.8       156       129        60
OIR    2025250     91400   20.0500 -113.3400       8.8       157       129        60
OIR    2025250     91400   20.0500 -113.3500       8.8       157       128        60
OIR    2025250     91400   20.0500 -113.3600       8.8       157       128        60
OIR    2025250     91400   20.0500 -113.3700       8.9       157       128        60
OIR    2025250     91400   20.0500 -113.3800       8.9       158       128        60
OIR    2025250     91400   20.0500 -113.3900       9.0       158       128        60
OIR    2025250     91400   20.0500 -113.4000       9.2       159       127        60
OIR    2025250     91400   20.0500 -113.4100       9.4       159       128        60
OIR    2025250     91400   20.0500 -113.4200       9.6       160       128        60
OIR    2025250     91400   20.0500 -113.4300       9.9       160       128        60
OIR    2025250     91400   20.0500 -113.4400      10.3       161       127        60
OIR    2025250     91400   20.0500 -113.4500      10.7       161       127        60
OIR    2025250     91400   20.0500 -113.4600      11.2       161       127        60
OIR    2025250     91400   20.0500 -113.4700      11.6       162       128        60
OIR    2025250     91400   20.0500 -113.4800      11.9       162       128        60
OIR    2025250     91400   20.0500 -113.4900      12.1       162       128        60
OIR    2025250     91400   20.0500 -113.5000      12.3       162       128        60
OIR    2025250     91400   20.0500 -113.5100      12.4       162       128        60
OIR    2025250     91400   20.0500 -113.5200      12.5       162       128        60
OIR    2025250     91400   20.0500 -113.5300      12.5       162       128        60
OIR    2025250     91400   20.0500 -113.5400      12.6       162       128        60
OIR    2025250     91400   20.0500 -113.5500      12.7       162       129        60
OIR    2025250     91400   20.0500 -113.5600      12.8       162       129        60
OIR    2025250     91400   20.0500 -113.5700      12.8       161       129        60
OIR    2025250     91400   20.0500 -113.5800      12.9       161       128        60
OIR    2025250     91400   20.0500 -113.5900      12.9       161       128        60
OIR    2025250     91400   20.0500 -113.6000      12.9       161       127        60
OIR    2025250     91400   20.0500 -113.6100      12.9       161       128        60
OIR    2025250     91400   20.0500 -113.6200      12.9       161       128        60
OIR    2025250     91400   20.0500 -113.6300      12.9       161       127        60
OIR    2025250     91400   20.0500 -113.6400      12.9       161       127        60
OIR    2025250     91400   20.0500 -113.6500      12.9       161       128        60
OIR    2025250     91400   20.0500 -113.6600      12.9       161       129        60
OIR    2025250     91400   20.0500 -113.6700      12.9       161       129        60
OIR    2025250     91400   20.0500 -113.6800      12.9       162       129        60
OIR    2025250     91400   20.0500 -113.6900      12.9       162       128        60
OIR    2025250     91400   20.0500 -113.7000      12.9       162       127        60
OIR    2025250     91400   20.0500 -113.7100      12.8       162       126        60
OIR    2025250     91400   20.0500 -113.7200      12.8       162       126        60
OIR    2025250     91400   20.0500 -113.7300      12.9       162       126        60
OIR    2025250     91400   20.0500 -113.7400      12.9       163       126        60
OIR    2025250     91400   20.0500 -113.7500      12.9       163       126        60
OIR    2025250     91400   20.0500 -113.7600      12.9       163       126        60
OIR    2025250     91400   20.0500 -113.7700      12.9       163       125        60
OIR    2025250     91400   20.0500 -113.7800      12.8       163       124        60
OIR    2025250     91400   20.0500 -113.7900      12.6       164       123        60
OIR    2025250     91400   20.0500 -113.8000      11.9       165       123        60
OIR    2025250     91400   20.0500 -113.8100      11.6       165       124        60
OIR    2025250     91400   20.0500 -113.8200      11.1       165       125        60
OIR    2025250     91400   20.0500 -113.8300      10.7       165       126        60
OIR    2025250     91400   20.0500 -113.8400      10.6       165       126        60
OIR    2025250     91400   20.0500 -113.8500      10.4       166       127        60
OIR    2025250     91400   20.0500 -113.8600      10.3       166       128        60
OIR    2025250     91400   20.0500 -113.8700      10.2       166       129        60
OIR    2025250     91400   20.0500 -113.8800      10.1       166       129        60
OIR    2025250     91400   20.0500 -113.8900      10.0       166       130        60
OIR    2025250     91400   20.0500 -113.9000       9.8       166       130        60
OIR    2025250     91400   20.0500 -113.9100       9.7       165       131        60
OIR    2025250     91400   20.0500 -113.9200       9.7       165       132        60
OIR    2025250     91400   20.0500 -113.9300       9.7       166       134        60
OIR    2025250     91400   20.0500 -113.9400       9.8       166       136        60
OIR    2025250     91400   20.0500 -113.9500       9.9       167       135        60
OIR    2025250     91400   20.0500 -113.9600      10.0       168       135        60
OIR    2025250     91400   20.0500 -113.9700       9.9       169       134        60
OIR    2025250     91400   20.0500 -113.9800       9.8       171       133        60
OIR    2025250     91400   20.0500 -113.9900       9.8       173       133        60
OIR    2025250     91400   20.0500 -114.0000       9.9       174       133        60
OIR    2025250     91400   20.0500 -114.0100      10.0       176       133        60
OIR    2025250     91400   20.0500 -114.0200      10.1       177       132        60
OIR    2025250     91400   20.0500 -114.0300      10.1       178       132        60
OIR    2025250     91400   20.0500 -114.0400      10.1       179       133        60
OIR    2025250     91400   20.0500 -114.0500      10.2       181       135        60
OIR    2025250     91400   20.0500 -114.0600      10.2       182       136        60
OIR    2025250     91400   20.0500 -114.0700      10.2       183       135        60
OIR    2025250     91400   20.0500 -114.0800      10.3       184       134        60
OIR    2025250     91400   20.0500 -114.0900      10.3       185       133        60
OIR    2025250     91400   20.0500 -114.1000      10.5       186       131        60
OIR    2025250     91400   20.0500 -114.1100      10.7       187       131        60
OIR    2025250     91400   20.0500 -114.1200      11.1       189       130        60
OIR    2025250     91400   20.0500 -114.1300      11.6       192       131        60
OIR    2025250     91400   20.0500 -114.1400      11.9       195       132        60
OIR    2025250     91400   20.0500 -114.1500      12.0       196       134        60
OIR    2025250     91400   20.0500 -114.1600      12.0       197       137        60
OIR    2025250     91400   20.0500 -114.1700      11.9       197       139        60
OIR    2025250     91400   20.0500 -116.1200      14.2       185       141        60
OIR    2025250     91400   20.0500 -116.1300      14.2       186       140        60
OIR    2025250     91400   20.0500 -116.1400      14.2       186       139        60
OIR    2025250     91400   20.0500 -116.1500      14.2       187       139        60
OIR    2025250     91400   20.0500 -116.1600      14.2       187       138        60
OIR    2025250     91400   20.0500 -116.1700      14.2       187       137        60
OIR    2025250     91400   20.0500 -116.1800      14.2       187       135        60
OIR    2025250     91400   20.0500 -116.1900      14.2       187       134        60
OIR    2025250     91400   20.0500 -116.2000      14.2       187       135        60
OIR    2025250     91400   20.0500 -116.2100      14.2       187       135        60
OIR    2025250     91400   20.0500 -116.2200      14.1       188       136        60
OIR    2025250     91400   20.0500 -116.2300      14.1       188       136        60
OIR    2025250     91400   20.0500 -116.2400      14.1       188       137        60
OIR    2025250     91400   20.0500 -116.2500      14.0       188       137        60
OIR    2025250     91400   20.0500 -116.2600      13.9       188       140        60
OIR    2025250     91400   20.0400 -109.8700      12.1        68       142        60
OIR    2025250     91400   20.0400 -109.8800      11.2        74       140        60
OIR    2025250     91400   20.0400 -109.8900      10.5        79       139        60
OIR    2025250     91400   20.0400 -109.9000      10.2        85       138        60
OIR    2025250     91400   20.0400 -109.9100      10.0        88       138        60
OIR    2025250     91400   20.0400 -109.9200       9.8        89       139        60
OIR    2025250     91400   20.0400 -109.9300       9.5        89       140        60
OIR    2025250     91400   20.0400 -109.9400       9.1        86       140        60
OIR    2025250     91400   20.0400 -109.9500       8.8        81       141        60
OIR    2025250     91400   20.0400 -112.8900      14.9       138       138        60
OIR    2025250     91400   20.0400 -112.9000      12.7       139       136        60
OIR    2025250     91400   20.0400 -112.9100      12.2       139       136        60
OIR    2025250     91400   20.0400 -112.9200      11.6       139       136        60
OIR    2025250     91400   20.0400 -112.9300      11.3       139       136        60
OIR    2025250     91400   20.0400 -112.9400      11.2       139       136        60
OIR    2025250     91400   20.0400 -112.9500      11.1       139       136        60
OIR    2025250     91400   20.0400 -112.9600      11.0       138       136        60
OIR    2025250     91400   20.0400 -112.9700      10.9       139       136        60
OIR    2025250     91400   20.0400 -112.9800      11.0       139       135        60
OIR    2025250     91400   20.0400 -112.9900      10.9       138       135        60
OIR    2025250     91400   20.0400 -113.0000      11.0       138       134        60
OIR    2025250     91400   20.0400 -113.0100      10.9       138       133        60
OIR    2025250     91400   20.0400 -113.0200      10.9       139       132        60
OIR    2025250     91400   20.0400 -113.0300      10.6       138       131        60
OIR    2025250     91400   20.0400 -113.0400      10.4       138       131        60
OIR    2025250     91400   20.0400 -113.0500      10.4       138       132        60
OIR    2025250     91400   20.0400 -113.0600      10.3       138       133        60
OIR    2025250     91400   20.0400 -113.0700      10.3       137       133        60
OIR    2025250     91400   20.0400 -113.0800      10.3       137       133        60
OIR    2025250     91400   20.0400 -113.0900      10.3       137       133        60
OIR    2025250     91400   20.0400 -113.1000      10.3       137       134        60
OIR    2025250     91400   20.0400 -113.1100      10.4       137       134        60
OIR    2025250     91400   20.0400 -113.1200      10.6       136       134        60
OIR    2025250     91400   20.0400 -113.1300      10.8       135       134        60
OIR    2025250     91400   20.0400 -113.1400      11.0       134       134        60
OIR    2025250     91400   20.0400 -113.1500      11.2       133       134        60
OIR    2025250     91400   20.0400 -113.1600      11.5       131       134        60
OIR    2025250     91400   20.0400 -113.1700      11.6       131       134        60
OIR    2025250     91400   20.0400 -113.1800      11.7       131       134        60
OIR    2025250     91400   20.0400 -113.1900      11.5       132       135        60
OIR    2025250     91400   20.0400 -113.2000      10.9       135       135        60
OIR    2025250     91400   20.0400 -113.2100       9.9       141       135        60
OIR    2025250     91400   20.0400 -113.2200       9.1       152       135        60
OIR    2025250     91400   20.0400 -113.2300       8.6       157       135        60
OIR    2025250     91400   20.0400 -113.2400       8.5       158       135        60
OIR    2025250     91400   20.0400 -113.2500       8.5       158       135        60
OIR    2025250     91400   20.0400 -113.2600       8.5       158       133        60
OIR    2025250     91400   20.0400 -113.2700       8.5       158       131        60
OIR    2025250     91400   20.0400 -113.2800       8.6       158       131        60
OIR    2025250     91400   20.0400 -113.2900       8.6       158       130        60
OIR    2025250     91400   20.0400 -113.3000       8.6       158       130        60
OIR    2025250     91400   20.0400 -113.3100       8.7       158       130        60
OIR    2025250     91400   20.0400 -113.3200       8.7       158       130        60
OIR    2025250     91400   20.0400 -113.3300       8.7       158       129        60
OIR    2025250     91400   20.0400 -113.3400       8.7       158       129        60
OIR    2025250     91400   20.0400 -113.3500       8.7       158       129        60
OIR    2025250     91400   20.0400 -113.3600       8.7       159       128        60
OIR    2025250     91400   20.0400 -113.3700       8.7       159       128        60
OIR    2025250     91400   20.0400 -113.3800       8.8       159       128        60
OIR    2025250     91400   20.0400 -113.3900       8.9       160       128        60
OIR    2025250     91400   20.0400 -113.4000       9.0       160       128        60
OIR    2025250     91400   20.0400 -113.4100       9.1       161       128        60
OIR    2025250     91400   20.0400 -113.4200       9.3       161       128        60
OIR    2025250     91400   20.0400 -113.4300       9.6       161       127        60
OIR    2025250     91400   20.0400 -113.4400       9.9       162       127        60
OIR    2025250     91400   20.0400 -113.4500      10.3       162       127        60
OIR    2025250     91400   20.0400 -113.4600      10.9       162       127        60
OIR    2025250     91400   20.0400 -113.4700      11.3       162       127        60
OIR    2025250     91400   20.0400 -113.4800      11.6       162       127        60
OIR    2025250     91400   20.0400 -113.4900      11.9       163       126        60
OIR    2025250     91400   20.0400 -113.5000      12.1       163       126        60
OIR    2025250     91400   20.0400 -113.5100      12.2       163       126        60
OIR    2025250     91400   20.0400 -113.5200      12.3       162       127        60
OIR    2025250     91400   20.0400 -113.5300      12.4       162       127        60
OIR    2025250     91400   20.0400 -113.5400      12.5       162       127        60
OIR    2025250     91400   20.0400 -113.5500      12.6       162       127        60
OIR    2025250     91400   20.0400 -113.5600      12.7       162       127        60
OIR    2025250     91400   20.0400 -113.5700      12.8       162       127        60
OIR    2025250     91400   20.0400 -113.5800      12.8       161       126        60
OIR    2025250     91400   20.0400 -113.5900      12.9       161       126        60
OIR    2025250     91400   20.0400 -113.6000      12.9       161       126        60
OIR    2025250     91400   20.0400 -113.6100      12.9       161       126        60
OIR    2025250     91400   20.0400 -113.6200      12.9       161       126        60
OIR    2025250     91400   20.0400 -113.6300      12.9       161       127        60
OIR    2025250     91400   20.0400 -113.6400      12.9       161       127        60
OIR    2025250     91400   20.0400 -113.6500      12.9       161       127        60
OIR    2025250     91400   20.0400 -113.6600      12.9       161       127        60
OIR    2025250     91400   20.0400 -113.6700      12.9       162       127        60
OIR    2025250     91400   20.0400 -113.6800      12.9       162       127        60
OIR    2025250     91400   20.0400 -113.6900      12.9       162       126        60
OIR    2025250     91400   20.0400 -113.7000      12.8       162       125        60
OIR    2025250     91400   20.0400 -113.7100      12.8       162       124        60
OIR    2025250     91400   20.0400 -113.7200      12.8       162       124        60
OIR    2025250     91400   20.0400 -113.7300      12.8       162       123        60
OIR    2025250     91400   20.0400 -113.7400      12.9       163       123        60
OIR    2025250     91400   20.0400 -113.7500      12.9       163       122        60
OIR    2025250     91400   20.0400 -113.7600      12.9       163       122        60
OIR    2025250     91400   20.0400 -113.7700      12.9       163       121        60
OIR    2025250     91400   20.0400 -113.7800      12.8       163       120        60
OIR    2025250     91400   20.0400 -113.7900      12.5       164       120        60
OIR    2025250     91400   20.0400 -113.8000      11.7       165       119        60
OIR    2025250     91400   20.0400 -113.8100      11.4       166       121        60
OIR    2025250     91400   20.0400 -113.8200      10.9       166       122        60
OIR    2025250     91400   20.0400 -113.8300      10.5       166       124        60
OIR    2025250     91400   20.0400 -113.8400      10.4       166       124        60
OIR    2025250     91400   20.0400 -113.8500      10.3       166       124        60
OIR    2025250     91400   20.0400 -113.8600      10.2       166       125        60
OIR    2025250     91400   20.0400 -113.8700      10.1       166       126        60
OIR    2025250     91400   20.0400 -113.8800      10.1       166       127        60
OIR    2025250     91400   20.0400 -113.8900      10.0       167       127        60
OIR    2025250     91400   20.0400 -113.9000       9.8       167       128        60
OIR    2025250     91400   20.0400 -113.9100       9.7       167       128        60
OIR    2025250     91400   20.0400 -113.9200       9.6       167       129        60
OIR    2025250     91400   20.0400 -113.9300       9.5       167       130        60
OIR    2025250     91400   20.0400 -113.9400       9.4       168       130        60
OIR    2025250     91400   20.0400 -113.9500       9.4       169       130        60
OIR    2025250     91400   20.0400 -113.9600       9.4       170       130        60
OIR    2025250     91400   20.0400 -113.9700       9.5       171       130        60
OIR    2025250     91400   20.0400 -113.9800       9.6       172       131        60
OIR    2025250     91400   20.0400 -113.9900       9.7       174       131        60
OIR    2025250     91400   20.0400 -114.0000       9.8       175       131        60
OIR    2025250     91400   20.0400 -114.0100       9.9       177       131        60
OIR    2025250     91400   20.0400 -114.0200      10.0       178       131        60
OIR    2025250     91400   20.0400 -114.0300      10.1       179       131        60
OIR    2025250     91400   20.0400 -114.0400      10.2       180       132        60
OIR    2025250     91400   20.0400 -114.0500      10.2       181       132        60
OIR    2025250     91400   20.0400 -114.0600      10.1       182       133        60
OIR    2025250     91400   20.0400 -114.0700      10.2       184       132        60
OIR    2025250     91400   20.0400 -114.0800      10.2       185       132        60
OIR    2025250     91400   20.0400 -114.0900      10.2       185       132        60
OIR    2025250     91400   20.0400 -114.1000      10.3       186       131        60
OIR    2025250     91400   20.0400 -114.1100      10.3       187       130        60
OIR    2025250     91400   20.0400 -114.1200      10.5       187       130        60
OIR    2025250     91400   20.0400 -114.1300      10.8       190       130        60
OIR    2025250     91400   20.0400 -114.1400      11.5       194       131        60
OIR    2025250     91400   20.0400 -114.1500      11.8       196       132        60
OIR    2025250     91400   20.0400 -114.1600      11.9       197       134        60
OIR    2025250     91400   20.0400 -114.1700      11.9       197       135        60
OIR    2025250     91400   20.0400 -114.1800      12.0       197       139        60
OIR    2025250     91400   20.0400 -116.1200      14.1       185       141        60
OIR    2025250     91400   20.0400 -116.1300      14.2       186       140        60
OIR    2025250     91400   20.0400 -116.1400      14.2       186       139        60
OIR    2025250     91400   20.0400 -116.1500      14.2       186       139        60
OIR    2025250     91400   20.0400 -116.1600      14.2       187       139        60
OIR    2025250     91400   20.0400 -116.1700      14.2       187       137        60
OIR    2025250     91400   20.0400 -116.1800      14.2       187       135        60
OIR    2025250     91400   20.0400 -116.1900      14.2       187       135        60
OIR    2025250     91400   20.0400 -116.2000      14.1       187       134        60
OIR    2025250     91400   20.0400 -116.2100      14.1       187       135        60
OIR    2025250     91400   20.0400 -116.2200      14.1       187       138        60
OIR    2025250     91400   20.0400 -116.2300      14.1       187       140        60
OIR    2025250     91400   20.0400 -116.2400      14.0       188       141        60
OIR    2025250     91400   20.0400 -116.2500      14.0       188       141        60
OIR    2025250     91400   20.0300 -109.8600      13.5        65       142        60
OIR    2025250     91400   20.0300 -109.8700      11.9        74       140        60
OIR    2025250     91400   20.0300 -109.8800      11.3        87       139        60
OIR    2025250     91400   20.0300 -109.8900      11.0        95       139        60
OIR    2025250     91400   20.0300 -109.9000      10.8        98       138        60
OIR    2025250     91400   20.0300 -109.9100      10.6        99       138        60
OIR    2025250     91400   20.0300 -109.9200      10.3        99       139        60
OIR    2025250     91400   20.0300 -109.9300       9.9        98       139        60
OIR    2025250     91400   20.0300 -109.9400       9.5        96       139        60
OIR    2025250     91400   20.0300 -109.9500       9.0        91       141        60
OIR    2025250     91400   20.0300 -112.8800      15.3       138       137        60
OIR    2025250     91400   20.0300 -112.8900      14.9       138       136        60
OIR    2025250     91400   20.0300 -112.9000      12.2       139       135        60
OIR    2025250     91400   20.0300 -112.9100      11.8       139       135        60
OIR    2025250     91400   20.0300 -112.9200      11.4       138       135        60
OIR    2025250     91400   20.0300 -112.9300      11.2       138       135        60
OIR    2025250     91400   20.0300 -112.9400      11.0       138       135        60
OIR    2025250     91400   20.0300 -112.9500      10.9       138       135        60
OIR    2025250     91400   20.0300 -112.9600      10.8       138       134        60
OIR    2025250     91400   20.0300 -112.9700      10.7       138       134        60
OIR    2025250     91400   20.0300 -112.9800      10.7       138       133        60
OIR    2025250     91400   20.0300 -112.9900      10.7       138       133        60
OIR    2025250     91400   20.0300 -113.0000      10.7       138       132        60
OIR    2025250     91400   20.0300 -113.0100      10.7       138       132        60
OIR    2025250     91400   20.0300 -113.0200      10.6       138       131        60
OIR    2025250     91400   20.0300 -113.0300      10.4       138       131        60
OIR    2025250     91400   20.0300 -113.0400      10.4       138       130        60
OIR    2025250     91400   20.0300 -113.0500      10.3       138       131        60
OIR    2025250     91400   20.0300 -113.0600      10.3       138       132        60
OIR    2025250     91400   20.0300 -113.0700      10.2       138       132        60
OIR    2025250     91400   20.0300 -113.0800      10.2       137       132        60
OIR    2025250     91400   20.0300 -113.0900      10.2       137       132        60
OIR    2025250     91400   20.0300 -113.1000      10.2       137       132        60
OIR    2025250     91400   20.0300 -113.1100      10.2       137       132        60
OIR    2025250     91400   20.0300 -113.1200      10.2       137       132        60
OIR    2025250     91400   20.0300 -113.1300      10.3       136       132        60
OIR    2025250     91400   20.0300 -113.1400      10.4       136       133        60
OIR    2025250     91400   20.0300 -113.1500      10.6       135       133        60
OIR    2025250     91400   20.0300 -113.1600      10.7       134       133        60
OIR    2025250     91400   20.0300 -113.1700      10.8       134       133        60
OIR    2025250     91400   20.0300 -113.1800      10.7       135       133        60
OIR    2025250     91400   20.0300 -113.1900       9.9       137       133        60
OIR    2025250     91400   20.0300 -113.2000       9.1       142       133        60
OIR    2025250     91400   20.0300 -113.2100       8.6       148       133        60
OIR    2025250     91400   20.0300 -113.2200       8.6       154       133        60
OIR    2025250     91400   20.0300 -113.2300       8.5       158       133        60
OIR    2025250     91400   20.0300 -113.2400       8.5       158       133        60
OIR    2025250     91400   20.0300 -113.2500       8.5       158       132        60
OIR    2025250     91400   20.0300 -113.2600       8.5       158       132        60
OIR    2025250     91400   20.0300 -113.2700       8.6       158       131        60
OIR    2025250     91400   20.0300 -113.2800       8.6       158       130        60
OIR    2025250     91400   20.0300 -113.2900       8.5       158       130        60
OIR    2025250     91400   20.0300 -113.3000       8.6       159       130        60
OIR    2025250     91400   20.0300 -113.3100       8.6       159       130        60
OIR    2025250     91400   20.0300 -113.3200       8.6       159       129        60
OIR    2025250     91400   20.0300 -113.3300       8.6       159       128        60
OIR    2025250     91400   20.0300 -113.3400       8.5       160       127        60
OIR    2025250     91400   20.0300 -113.3500       8.6       160       126        60
OIR    2025250     91400   20.0300 -113.3600       8.6       160       126        60
OIR    2025250     91400   20.0300 -113.3700       8.6       160       126        60
OIR    2025250     91400   20.0300 -113.3800       8.7       161       127        60
OIR    2025250     91400   20.0300 -113.3900       8.7       161       127        60
OIR    2025250     91400   20.0300 -113.4000       8.8       161       127        60
OIR    2025250     91400   20.0300 -113.4100       8.9       162       127        60
OIR    2025250     91400   20.0300 -113.4200       9.1       162       127        60
OIR    2025250     91400   20.0300 -113.4300       9.3       162       126        60
OIR    2025250     91400   20.0300 -113.4400       9.6       163       126        60
OIR    2025250     91400   20.0300 -113.4500      10.0       163       126        60
OIR    2025250     91400   20.0300 -113.4600      10.4       163       126        60
OIR    2025250     91400   20.0300 -113.4700      11.0       163       126        60
OIR    2025250     91400   20.0300 -113.4800      11.4       163       125        60
OIR    2025250     91400   20.0300 -113.4900      11.7       163       125        60
OIR    2025250     91400   20.0300 -113.5000      11.9       163       124        60
OIR    2025250     91400   20.0300 -113.5100      12.1       163       125        60
OIR    2025250     91400   20.0300 -113.5200      12.2       163       125        60
OIR    2025250     91400   20.0300 -113.5300      12.3       162       126        60
OIR    2025250     91400   20.0300 -113.5400      12.4       162       126        60
OIR    2025250     91400   20.0300 -113.5500      12.5       162       125        60
OIR    2025250     91400   20.0300 -113.5600      12.6       162       125        60
OIR    2025250     91400   20.0300 -113.5700      12.7       162       124        60
OIR    2025250     91400   20.0300 -113.5800      12.8       162       123        60
OIR    2025250     91400   20.0300 -113.5900      12.9       161       123        60
OIR    2025250     91400   20.0300 -113.6000      12.9       161       124        60
OIR    2025250     91400   20.0300 -113.6100      12.9       161       125        60
OIR    2025250     91400   20.0300 -113.6200      12.9       161       125        60
OIR    2025250     91400   20.0300 -113.6300      12.9       161       126        60
OIR    2025250     91400   20.0300 -113.6400      12.9       161       126        60
OIR    2025250     91400   20.0300 -113.6500      12.9       161       125        60
OIR    2025250     91400   20.0300 -113.6600      12.9       162       124        60
OIR    2025250     91400   20.0300 -113.6700      12.9       162       123        60
OIR    2025250     91400   20.0300 -113.6800      12.9       162       124        60
OIR    2025250     91400   20.0300 -113.6900      12.9       162       124        60
OIR    2025250     91400   20.0300 -113.7000      12.8       162       123        60
OIR    2025250     91400   20.0300 -113.7100      12.8       162       123        60
OIR    2025250     91400   20.0300 -113.7200      12.8       162       122        60
OIR    2025250     91400   20.0300 -113.7300      12.8       162       121        60
OIR    2025250     91400   20.0300 -113.7400      12.8       163       120        60
OIR    2025250     91400   20.0300 -113.7500      12.8       163       117        60
OIR    2025250     91400   20.0300 -113.7600      12.8       163       116        60
OIR    2025250     91400   20.0300 -113.7700      12.8       163       116        60
OIR    2025250     91400   20.0300 -113.7800      12.7       164       116        60
OIR    2025250     91400   20.0300 -113.7900      12.2       165       116        60
OIR    2025250     91400   20.0300 -113.8000      11.6       166       116        60
OIR    2025250     91400   20.0300 -113.8100      11.1       167       117        60
OIR    2025250     91400   20.0300 -113.8200      10.7       167       120        60
OIR    2025250     91400   20.0300 -113.8300      10.4       166       121        60
OIR    2025250     91400   20.0300 -113.8400      10.2       166       121        60
OIR    2025250     91400   20.0300 -113.8500      10.2       166       121        60
OIR    2025250     91400   20.0300 -113.8600      10.2       166       122        60
OIR    2025250     91400   20.0300 -113.8700      10.1       166       124        60
OIR    2025250     91400   20.0300 -113.8800      10.0       167       125        60
OIR    2025250     91400   20.0300 -113.8900       9.9       167       126        60
OIR    2025250     91400   20.0300 -113.9000       9.8       168       126        60
OIR    2025250     91400   20.0300 -113.9100       9.6       168       126        60
OIR    2025250     91400   20.0300 -113.9200       9.5       169       126        60
OIR    2025250     91400   20.0300 -113.9300       9.5       169       127        60
OIR    2025250     91400   20.0300 -113.9400       9.4       170       127        60
OIR    2025250     91400   20.0300 -113.9500       9.4       170       128        60
OIR    2025250     91400   20.0300 -113.9600       9.4       171       128        60
OIR    2025250     91400   20.0300 -113.9700       9.4       172       128        60
OIR    2025250     91400   20.0300 -113.9800       9.4       173       128        60
OIR    2025250     91400   20.0300 -113.9900       9.6       175       129        60
OIR    2025250     91400   20.0300 -114.0000       9.7       176       129        60
OIR    2025250     91400   20.0300 -114.0100       9.8       178       129        60
OIR    2025250     91400   20.0300 -114.0200       9.9       179       129        60
OIR    2025250     91400   20.0300 -114.0300      10.1       180       130        60
OIR    2025250     91400   20.0300 -114.0400      10.1       181       130        60
OIR    2025250     91400   20.0300 -114.0500      10.1       182       130        60
OIR    2025250     91400   20.0300 -114.0600      10.1       183       130        60
OIR    2025250     91400   20.0300 -114.0700      10.1       184       130        60
OIR    2025250     91400   20.0300 -114.0800      10.1       185       131        60
OIR    2025250     91400   20.0300 -114.0900      10.2       185       130        60
OIR    2025250     91400   20.0300 -114.1000      10.2       186       130        60
OIR    2025250     91400   20.0300 -114.1100      10.2       186       130        60
OIR    2025250     91400   20.0300 -114.1200      10.2       187       129        60
OIR    2025250     91400   20.0300 -114.1300      10.3       188       130        60
OIR    2025250     91400   20.0300 -114.1400      10.4       190       130        60
OIR    2025250     91400   20.0300 -114.1500      11.3       194       131        60
OIR    2025250     91400   20.0300 -114.1600      11.6       196       132        60
OIR    2025250     91400   20.0300 -114.1700      11.9       197       132        60
OIR    2025250     91400   20.0300 -114.1800      12.2       198       134        60
OIR    2025250     91400   20.0300 -114.1900      12.6       198       137        60
OIR    2025250     91400   20.0300 -116.1200      14.1       184       141        60
OIR    2025250     91400   20.0300 -116.1300      14.1       185       140        60
OIR    2025250     91400   20.0300 -116.1400      14.1       186       138        60
OIR    2025250     91400   20.0300 -116.1500      14.2       186       139        60
OIR    2025250     91400   20.0300 -116.1600      14.2       186       140        60
OIR    2025250     91400   20.0300 -116.1700      14.1       187       138        60
OIR    2025250     91400   20.0300 -116.1800      14.1       187       136        60
OIR    2025250     91400   20.0300 -116.1900      14.1       187       135        60
OIR    2025250     91400   20.0300 -116.2000      14.1       187       134        60
OIR    2025250     91400   20.0300 -116.2100      14.1       187       135        60
OIR    2025250     91400   20.0300 -116.2200      14.1       187       139        60
OIR    2025250     91400   20.0200 -109.8800      12.0        97       142        60
OIR    2025250     91400   20.0200 -109.9100      10.7       100       142        60
OIR    2025250     91400   20.0200 -109.9200      10.5       101       142        60
OIR    2025250     91400   20.0200 -109.9300      10.1       101       142        60
OIR    2025250     91400   20.0200 -112.8800      15.1       138       139        60
OIR    2025250     91400   20.0200 -112.8900      13.8       139       138        60
OIR    2025250     91400   20.0200 -112.9000      11.8       139       137        60
OIR    2025250     91400   20.0200 -112.9100      11.4       138       136        60
OIR    2025250     91400   20.0200 -112.9200      11.2       138       135        60
OIR    2025250     91400   20.0200 -112.9300      11.0       138       135        60
OIR    2025250     91400   20.0200 -112.9400      10.8       138       135        60
OIR    2025250     91400   20.0200 -112.9500      10.7       138       134        60
OIR    2025250     91400   20.0200 -112.9600      10.7       138       134        60
OIR    2025250     91400   20.0200 -112.9700      10.6       138       133        60
OIR    2025250     91400   20.0200 -112.9800      10.6       138       132        60
OIR    2025250     91400   20.0200 -112.9900      10.6       138       132        60
OIR    2025250     91400   20.0200 -113.0000      10.6       138       131        60
OIR    2025250     91400   20.0200 -113.0100      10.6       138       131        60
OIR    2025250     91400   20.0200 -113.0200      10.5       138       131        60
OIR    2025250     91400   20.0200 -113.0300      10.4       138       130        60
OIR    2025250     91400   20.0200 -113.0400      10.3       138       129        60
OIR    2025250     91400   20.0200 -113.0500      10.3       138       129        60
OIR    2025250     91400   20.0200 -113.0600      10.2       138       131        60
OIR    2025250     91400   20.0200 -113.0700      10.2       138       131        60
OIR    2025250     91400   20.0200 -113.0800      10.2       137       131        60
OIR    2025250     91400   20.0200 -113.0900      10.1       137       131        60
OIR    2025250     91400   20.0200 -113.1000      10.1       137       131        60
OIR    2025250     91400   20.0200 -113.1100      10.1       137       130        60
OIR    2025250     91400   20.0200 -113.1200      10.0       137       130        60
OIR    2025250     91400   20.0200 -113.1300      10.0       137       131        60
OIR    2025250     91400   20.0200 -113.1400       9.8       137       131        60
OIR    2025250     91400   20.0200 -113.1500       9.6       138       132        60
OIR    2025250     91400   20.0200 -113.1600       9.3       141       132        60
OIR    2025250     91400   20.0200 -113.1700       9.1       144       132        60
OIR    2025250     91400   20.0200 -113.1800       9.0       148       131        60
OIR    2025250     91400   20.0200 -113.1900       8.4       149       131        60
OIR    2025250     91400   20.0200 -113.2000       8.3       152       131        60
OIR    2025250     91400   20.0200 -113.2100       8.3       155       131        60
OIR    2025250     91400   20.0200 -113.2200       8.3       157       131        60
OIR    2025250     91400   20.0200 -113.2300       8.4       158       132        60
OIR    2025250     91400   20.0200 -113.2400       8.5       158       131        60
OIR    2025250     91400   20.0200 -113.2500       8.5       158       129        60
OIR    2025250     91400   20.0200 -113.2600       8.5       158       129        60
OIR    2025250     91400   20.0200 -113.2700       8.5       159       129        60
OIR    2025250     91400   20.0200 -113.2800       8.5       159       129        60
OIR    2025250     91400   20.0200 -113.2900       8.5       159       129        60
OIR    2025250     91400   20.0200 -113.3000       8.5       160       129        60
OIR    2025250     91400   20.0200 -113.3100       8.5       160       129        60
OIR    2025250     91400   20.0200 -113.3200       8.5       160       129        60
OIR    2025250     91400   20.0200 -113.3300       8.5       161       126        60
OIR    2025250     91400   20.0200 -113.3400       8.5       161       123        60
OIR    2025250     91400   20.0200 -113.3500       8.5       161       122        60
OIR    2025250     91400   20.0200 -113.3600       8.5       161       123        60
OIR    2025250     91400   20.0200 -113.3700       8.6       161       123        60
OIR    2025250     91400   20.0200 -113.3800       8.6       161       125        60
OIR    2025250     91400   20.0200 -113.3900       8.7       162       126        60
OIR    2025250     91400   20.0200 -113.4000       8.7       162       126        60
OIR    2025250     91400   20.0200 -113.4100       8.8       162       126        60
OIR    2025250     91400   20.0200 -113.4200       9.0       163       125        60
OIR    2025250     91400   20.0200 -113.4300       9.1       163       124        60
OIR    2025250     91400   20.0200 -113.4400       9.4       163       123        60
OIR    2025250     91400   20.0200 -113.4500       9.7       163       123        60
OIR    2025250     91400   20.0200 -113.4600      10.1       164       123        60
OIR    2025250     91400   20.0200 -113.4700      10.6       164       122        60
OIR    2025250     91400   20.0200 -113.4800      11.2       164       121        60
OIR    2025250     91400   20.0200 -113.4900      11.5       163       121        60
OIR    2025250     91400   20.0200 -113.5000      11.8       163       122        60
OIR    2025250     91400   20.0200 -113.5100      12.0       163       123        60
OIR    2025250     91400   20.0200 -113.5200      12.1       163       123        60
OIR    2025250     91400   20.0200 -113.5300      12.2       162       124        60
OIR    2025250     91400   20.0200 -113.5400      12.3       162       123        60
OIR    2025250     91400   20.0200 -113.5500      12.5       162       123        60
OIR    2025250     91400   20.0200 -113.5600      12.6       162       123        60
OIR    2025250     91400   20.0200 -113.5700      12.7       162       121        60
OIR    2025250     91400   20.0200 -113.5800      12.8       162       121        60
OIR    2025250     91400   20.0200 -113.5900      12.8       161       122        60
OIR    2025250     91400   20.0200 -113.6000      12.9       161       122        60
OIR    2025250     91400   20.0200 -113.6100      12.9       161       123        60
OIR    2025250     91400   20.0200 -113.6200      12.9       161       124        60
OIR    2025250     91400   20.0200 -113.6300      12.9       161       123        60
OIR    2025250     91400   20.0200 -113.6400      12.9       162       123        60
OIR    2025250     91400   20.0200 -113.6500      12.9       162       123        60
OIR    2025250     91400   20.0200 -113.6600      12.9       162       121        60
OIR    2025250     91400   20.0200 -113.6700      12.9       162       120        60
OIR    2025250     91400   20.0200 -113.6800      12.9       162       121        60
OIR    2025250     91400   20.0200 -113.6900      12.8       162       121        60
OIR    2025250     91400   20.0200 -113.7000      12.8       162       121        60
OIR    2025250     91400   20.0200 -113.7100      12.7       162       120        60
OIR    2025250     91400   20.0200 -113.7200      12.7       162       119        60
OIR    2025250     91400   20.0200 -113.7300      12.7       162       117        60
OIR    2025250     91400   20.0200 -113.7400      12.7       163       116        60
OIR    2025250     91400   20.0200 -113.7500      12.7       163       115        60
OIR    2025250     91400   20.0200 -113.7600      12.7       163       113        60
OIR    2025250     91400   20.0200 -113.7700      12.5       164       113        60
OIR    2025250     91400   20.0200 -113.7800      12.2       165       114        60
OIR    2025250     91400   20.0200 -113.7900      11.7       166       115        60
OIR    2025250     91400   20.0200 -113.8000      11.2       167       116        60
OIR    2025250     91400   20.0200 -113.8100      10.8       167       116        60
OIR    2025250     91400   20.0200 -113.8200      10.5       167       116        60
OIR    2025250     91400   20.0200 -113.8300      10.3       167       117        60
OIR    2025250     91400   20.0200 -113.8400      10.2       167       117        60
OIR    2025250     91400   20.0200 -113.8500      10.1       167       117        60
OIR    2025250     91400   20.0200 -113.8600      10.1       167       119        60
OIR    2025250     91400   20.0200 -113.8700      10.0       167       121        60
OIR    2025250     91400   20.0200 -113.8800       9.9       168       123        60
OIR    2025250     91400   20.0200 -113.8900       9.8       168       124        60
OIR    2025250     91400   20.0200 -113.9000       9.6       169       125        60
OIR    2025250     91400   20.0200 -113.9100       9.5       169       124        60
OIR    2025250     91400   20.0200 -113.9200       9.4       170       124        60
OIR    2025250     91400   20.0200 -113.9300       9.4       170       124        60
OIR    2025250     91400   20.0200 -113.9400       9.4       171       125        60
OIR    2025250     91400   20.0200 -113.9500       9.3       171       126        60
OIR    2025250     91400   20.0200 -113.9600       9.3       172       126        60
OIR    2025250     91400   20.0200 -113.9700       9.3       172       127        60
OIR    2025250     91400   20.0200 -113.9800       9.4       173       127        60
OIR    2025250     91400   20.0200 -113.9900       9.5       176       127        60
OIR    2025250     91400   20.0200 -114.0000       9.6       177       127        60
OIR    2025250     91400   20.0200 -114.0100       9.7       179       126        60
OIR    2025250     91400   20.0200 -114.0200       9.8       180       127        60
OIR    2025250     91400   20.0200 -114.0300       9.9       181       127        60
OIR    2025250     91400   20.0200 -114.0400      10.0       182       127        60
OIR    2025250     91400   20.0200 -114.0500      10.0       183       128        60
OIR    2025250     91400   20.0200 -114.0600      10.0       183       128        60
OIR    2025250     91400   20.0200 -114.0700      10.0       184       129        60
OIR    2025250     91400   20.0200 -114.0800      10.1       184       130        60
OIR    2025250     91400   20.0200 -114.0900      10.1       185       130        60
OIR    2025250     91400   20.0200 -114.1000      10.1       186       129        60
OIR    2025250     91400   20.0200 -114.1100      10.2       186       129        60
OIR    2025250     91400   20.0200 -114.1200      10.2       187       129        60
OIR    2025250     91400   20.0200 -114.1300      10.2       187       129        60
OIR    2025250     91400   20.0200 -114.1400      10.2       188       130        60
OIR    2025250     91400   20.0200 -114.1500      10.3       190       130        60
OIR    2025250     91400   20.0200 -114.1600      11.0       193       131        60
OIR    2025250     91400   20.0200 -114.1700      11.7       196       131        60
OIR    2025250     91400   20.0200 -114.1800      12.3       198       132        60
OIR    2025250     91400   20.0200 -114.1900      12.6       198       133        60
OIR    2025250     91400   20.0200 -114.2000      12.8       199       135        60
OIR    2025250     91400   20.0200 -114.2100      12.8       199       138        60
OIR    2025250     91400   20.0200 -116.1200      14.0       183       141        60
OIR    2025250     91400   20.0200 -116.1300      14.0       184       140        60
OIR    2025250     91400   20.0200 -116.1400      14.1       186       140        60
OIR    2025250     91400   20.0200 -116.1500      14.1       186       140        60
OIR    2025250     91400   20.0200 -116.1600      14.1       186       140        60
OIR    2025250     91400   20.0200 -116.1700      14.1       186       139        60
OIR    2025250     91400   20.0200 -116.1800      14.1       187       137        60
OIR    2025250     91400   20.0200 -116.1900      14.1       187       136        60
OIR    2025250     91400   20.0200 -116.2000      14.1       187       137        60
OIR    2025250     91400   20.0200 -116.2100      14.0       187       138        60
OIR    2025250     91400   20.0200 -116.2200      14.0       187       141        60
OIR    2025250     91400   20.0100 -112.9000      11.4       138       139        60
OIR    2025250     91400   20.0100 -112.9100      11.1       138       138        60
OIR    2025250     91400   20.0100 -112.9200      10.9       137       137        60
OIR    2025250     91400   20.0100 -112.9300      10.8       137       136        60
OIR    2025250     91400   20.0100 -112.9400      10.7       137       135        60
OIR    2025250     91400   20.0100 -112.9500      10.6       138       134        60
OIR    2025250     91400   20.0100 -112.9600      10.6       138       133        60
OIR    2025250     91400   20.0100 -112.9700      10.6       138       133        60
OIR    2025250     91400   20.0100 -112.9800      10.6       138       132        60
OIR    2025250     91400   20.0100 -112.9900      10.6       138       132        60
OIR    2025250     91400   20.0100 -113.0000      10.6       138       131        60
OIR    2025250     91400   20.0100 -113.0100      10.5       138       131        60
OIR    2025250     91400   20.0100 -113.0200      10.4       138       131        60
OIR    2025250     91400   20.0100 -113.0300      10.3       138       129        60
OIR    2025250     91400   20.0100 -113.0400      10.3       138       127        60
OIR    2025250     91400   20.0100 -113.0500      10.2       138       127        60
OIR    2025250     91400   20.0100 -113.0600      10.2       138       129        60
OIR    2025250     91400   20.0100 -113.0700      10.1       138       131        60
OIR    2025250     91400   20.0100 -113.0800      10.1       138       131        60
OIR    2025250     91400   20.0100 -113.0900      10.1       138       131        60
OIR    2025250     91400   20.0100 -113.1000      10.0       137       130        60
OIR    2025250     91400   20.0100 -113.1100      10.0       138       130        60
OIR    2025250     91400   20.0100 -113.1200       9.9       138       129        60
OIR    2025250     91400   20.0100 -113.1300       9.7       138       130        60
OIR    2025250     91400   20.0100 -113.1400       9.4       140       131        60
OIR    2025250     91400   20.0100 -113.1500       9.0       142       131        60
OIR    2025250     91400   20.0100 -113.1600       8.7       145       131        60
OIR    2025250     91400   20.0100 -113.1700       8.4       150       131        60
OIR    2025250     91400   20.0100 -113.1800       8.2       153       130        60
OIR    2025250     91400   20.0100 -113.1900       8.1       154       130        60
OIR    2025250     91400   20.0100 -113.2000       8.1       156       129        60
OIR    2025250     91400   20.0100 -113.2100       8.2       157       129        60
OIR    2025250     91400   20.0100 -113.2200       8.2       158       128        60
OIR    2025250     91400   20.0100 -113.2300       8.3       159       128        60
OIR    2025250     91400   20.0100 -113.2400       8.4       159       128        60
OIR    2025250     91400   20.0100 -113.2500       8.5       159       127        60
OIR    2025250     91400   20.0100 -113.2600       8.5       160       127        60
OIR    2025250     91400   20.0100 -113.2700       8.5       160       127        60
OIR    2025250     91400   20.0100 -113.2800       8.5       160       127        60
OIR    2025250     91400   20.0100 -113.2900       8.5       161       127        60
OIR    2025250     91400   20.0100 -113.3000       8.4       161       126        60
OIR    2025250     91400   20.0100 -113.3100       8.4       161       127        60
OIR    2025250     91400   20.0100 -113.3200       8.4       162       127        60
OIR    2025250     91400   20.0100 -113.3300       8.4       162       125        60
OIR    2025250     91400   20.0100 -113.3400       8.4       162       122        60
OIR    2025250     91400   20.0100 -113.3500       8.5       162       121        60
OIR    2025250     91400   20.0100 -113.3600       8.5       162       121        60
OIR    2025250     91400   20.0100 -113.3700       8.5       162       121        60
OIR    2025250     91400   20.0100 -113.3800       8.6       162       123        60
OIR    2025250     91400   20.0100 -113.3900       8.6       163       124        60
OIR    2025250     91400   20.0100 -113.4000       8.7       163       125        60
OIR    2025250     91400   20.0100 -113.4100       8.8       163       125        60
OIR    2025250     91400   20.0100 -113.4200       8.9       163       124        60
OIR    2025250     91400   20.0100 -113.4300       9.0       164       122        60
OIR    2025250     91400   20.0100 -113.4400       9.3       164       121        60
OIR    2025250     91400   20.0100 -113.4500       9.6       164       121        60
OIR    2025250     91400   20.0100 -113.4600       9.9       164       121        60
OIR    2025250     91400   20.0100 -113.4700      10.3       164       120        60
OIR    2025250     91400   20.0100 -113.4800      10.9       164       117        60
OIR    2025250     91400   20.0100 -113.4900      11.3       164       116        60
OIR    2025250     91400   20.0100 -113.5000      11.6       163       119        60
OIR    2025250     91400   20.0100 -113.5100      11.8       163       121        60
OIR    2025250     91400   20.0100 -113.5200      12.0       163       121        60
OIR    2025250     91400   20.0100 -113.5300      12.2       162       121        60
OIR    2025250     91400   20.0100 -113.5400      12.3       162       121        60
OIR    2025250     91400   20.0100 -113.5500      12.4       162       121        60
OIR    2025250     91400   20.0100 -113.5600      12.6       162       121        60
OIR    2025250     91400   20.0100 -113.5700      12.7       162       119        60
OIR    2025250     91400   20.0100 -113.5800      12.8       162       117        60
OIR    2025250     91400   20.0100 -113.5900      12.9       162       119        60
OIR    2025250     91400   20.0100 -113.6000      12.9       162       121        60
OIR    2025250     91400   20.0100 -113.6100      12.9       162       121        60
OIR    2025250     91400   20.0100 -113.6200      12.9       162       121        60
OIR    2025250     91400   20.0100 -113.6300      12.9       162       120        60
OIR    2025250     91400   20.0100 -113.6400      12.9       162       119        60
OIR    2025250     91400   20.0100 -113.6500      12.9       162       117        60
OIR    2025250     91400   20.0100 -113.6600      12.9       162       117        60
OIR    2025250     91400   20.0100 -113.6700      12.9       162       116        60
OIR    2025250     91400   20.0100 -113.6800      12.9       162       117        60
OIR    2025250     91400   20.0100 -113.6900      12.9       162       117        60
OIR    2025250     91400   20.0100 -113.7000      12.7       162       116        60
OIR    2025250     91400   20.0100 -113.7100      12.6       162       115        60
OIR    2025250     91400   20.0100 -113.7200      12.5       162       114        60
OIR    2025250     91400   20.0100 -113.7300      12.4       163       113        60
OIR    2025250     91400   20.0100 -113.7400      12.4       163       112        60
OIR    2025250     91400   20.0100 -113.7500      12.4       164       112        60
OIR    2025250     91400   20.0100 -113.7600      12.2       164       111        60
OIR    2025250     91400   20.0100 -113.7700      11.8       165       111        60
OIR    2025250     91400   20.0100 -113.7800      11.4       166       112        60
OIR    2025250     91400   20.0100 -113.7900      11.0       167       113        60
OIR    2025250     91400   20.0100 -113.8000      10.7       168       113        60
OIR    2025250     91400   20.0100 -113.8100      10.5       168       113        60
OIR    2025250     91400   20.0100 -113.8200      10.4       168       114        60
OIR    2025250     91400   20.0100 -113.8300      10.2       167       115        60
OIR    2025250     91400   20.0100 -113.8400      10.1       167       116        60
OIR    2025250     91400   20.0100 -113.8500      10.1       167       116        60
OIR    2025250     91400   20.0100 -113.8600      10.0       168       117        60
OIR    2025250     91400   20.0100 -113.8700       9.8       168       120        60
OIR    2025250     91400   20.0100 -113.8800       9.7       169       121        60
OIR    2025250     91400   20.0100 -113.8900       9.6       170       122        60
OIR    2025250     91400   20.0100 -113.9000       9.5       170       122        60
OIR    2025250     91400   20.0100 -113.9100       9.5       170       122        60
OIR    2025250     91400   20.0100 -113.9200       9.4       171       121        60
OIR    2025250     91400   20.0100 -113.9300       9.4       171       122        60
OIR    2025250     91400   20.0100 -113.9400       9.3       171       123        60
OIR    2025250     91400   20.0100 -113.9500       9.3       172       124        60
OIR    2025250     91400   20.0100 -113.9600       9.3       172       124        60
OIR    2025250     91400   20.0100 -113.9700       9.3       173       125        60
OIR    2025250     91400   20.0100 -113.9800       9.3       174       125        60
OIR    2025250     91400   20.0100 -113.9900       9.4       176       125        60
OIR    2025250     91400   20.0100 -114.0000       9.5       178       124        60
OIR    2025250     91400   20.0100 -114.0100       9.6       179       123        60
OIR    2025250     91400   20.0100 -114.0200       9.7       181       123        60
OIR    2025250     91400   20.0100 -114.0300       9.9       182       124        60
OIR    2025250     91400   20.0100 -114.0400       9.9       182       124        60
OIR    2025250     91400   20.0100 -114.0500      10.0       183       125        60
OIR    2025250     91400   20.0100 -114.0600      10.0       183       126        60
OIR    2025250     91400   20.0100 -114.0700      10.0       184       127        60
OIR    2025250     91400   20.0100 -114.0800      10.1       184       128        60
OIR    2025250     91400   20.0100 -114.0900      10.1       185       129        60
OIR    2025250     91400   20.0100 -114.1000      10.1       186       129        60
OIR    2025250     91400   20.0100 -114.1100      10.1       186       129        60
OIR    2025250     91400   20.0100 -114.1200      10.1       187       129        60
OIR    2025250     91400   20.0100 -114.1300      10.1       187       129        60
OIR    2025250     91400   20.0100 -114.1400      10.1       188       129        60
OIR    2025250     91400   20.0100 -114.1500      10.2       189       130        60
OIR    2025250     91400   20.0100 -114.1600      10.5       191       130        60
OIR    2025250     91400   20.0100 -114.1700      11.2       195       130        60
OIR    2025250     91400   20.0100 -114.1800      11.8       197       130        60
OIR    2025250     91400   20.0100 -114.1900      12.3       198       130        60
OIR    2025250     91400   20.0100 -114.2000      12.7       199       130        60
OIR    2025250     91400   20.0100 -114.2100      12.8       199       132        60
OIR    2025250     91400   20.0100 -114.2200      12.7       200       134        60
OIR    2025250     91400   20.0100 -114.2300      12.6       201       137        60
OIR    2025250     91400   20.0100 -116.1100      13.9       180       142        60
OIR    2025250     91400   20.0100 -116.1200      13.9       182       140        60
OIR    2025250     91400   20.0100 -116.1300      13.9       184       140        60
OIR    2025250     91400   20.0100 -116.1400      14.0       185       141        60
OIR    2025250     91400   20.0100 -116.1500      14.0       186       141        60
OIR    2025250     91400   20.0100 -116.1600      14.0       186       141        60
OIR    2025250     91400   20.0100 -116.1700      14.0       186       140        60
OIR    2025250     91400   20.0100 -116.1800      14.0       186       138        60
OIR    2025250     91400   20.0100 -116.1900      14.0       187       136        60
OIR    2025250     91400   20.0100 -116.2000      14.0       187       139        60
OIR    2025250     91400   20.0100 -116.2100      14.0       187       142        60
OIR    2025250     91400   20.0000 -112.9000      11.2       137       139        60
OIR    2025250     91400   20.0000 -112.9100      11.0       137       138        60
OIR    2025250     91400   20.0000 -112.9200      10.8       137       137        60
OIR    2025250     91400   20.0000 -112.9300      10.7       137       136        60
OIR    2025250     91400   20.0000 -112.9400      10.6       137       135        60
OIR    2025250     91400   20.0000 -112.9500      10.6       137       134        60
OIR    2025250     91400   20.0000 -112.9600      10.6       138       134        60
OIR    2025250     91400   20.0000 -112.9700      10.6       138       133        60
OIR    2025250     91400   20.0000 -112.9800      10.5       138       133        60
OIR    2025250     91400   20.0000 -112.9900      10.5       138       132        60
OIR    2025250     91400   20.0000 -113.0000      10.5       138       132        60
OIR    2025250     91400   20.0000 -113.0100      10.4       138       131        60
OIR    2025250     91400   20.0000 -113.0200      10.3       138       131        60
OIR    2025250     91400   20.0000 -113.0300      10.2       138       130        60
OIR    2025250     91400   20.0000 -113.0400      10.2       138       127        60
OIR    2025250     91400   20.0000 -113.0500      10.2       138       126        60
OIR    2025250     91400   20.0000 -113.0600      10.1       138       128        60
OIR    2025250     91400   20.0000 -113.0700      10.0       138       131        60
OIR    2025250     91400   20.0000 -113.0800      10.0       138       131        60
OIR    2025250     91400   20.0000 -113.0900       9.9       138       132        60
OIR    2025250     91400   20.0000 -113.1000       9.9       138       131        60
OIR    2025250     91400   20.0000 -113.1100       9.8       138       130        60
OIR    2025250     91400   20.0000 -113.1200       9.6       139       129        60
OIR    2025250     91400   20.0000 -113.1300       9.4       140       129        60
OIR    2025250     91400   20.0000 -113.1400       9.0       142       130        60
OIR    2025250     91400   20.0000 -113.1500       8.5       146       130        60
OIR    2025250     91400   20.0000 -113.1600       8.2       149       130        60
OIR    2025250     91400   20.0000 -113.1700       8.0       153       130        60
OIR    2025250     91400   20.0000 -113.1800       8.0       155       129        60
OIR    2025250     91400   20.0000 -113.1900       7.9       156       129        60
OIR    2025250     91400   20.0000 -113.2000       7.9       157       128        60
OIR    2025250     91400   20.0000 -113.2100       8.0       158       127        60
OIR    2025250     91400   20.0000 -113.2200       8.1       159       126        60
OIR    2025250     91400   20.0000 -113.2300       8.2       160       125        60
OIR    2025250     91400   20.0000 -113.2400       8.3       161       124        60
OIR    2025250     91400   20.0000 -113.2500       8.4       161       124        60
OIR    2025250     91400   20.0000 -113.2600       8.4       161       124        60
OIR    2025250     91400   20.0000 -113.2700       8.4       162       124        60
OIR    2025250     91400   20.0000 -113.2800       8.4       162       124        60
OIR    2025250     91400   20.0000 -113.2900       8.4       162       124        60
OIR    2025250     91400   20.0000 -113.3000       8.4       163       123        60
OIR    2025250     91400   20.0000 -113.3100       8.4       163       123        60
OIR    2025250     91400   20.0000 -113.3200       8.4       163       123        60
OIR    2025250     91400   20.0000 -113.3300       8.4       163       124        60
OIR    2025250     91400   20.0000 -113.3400       8.4       163       124        60
OIR    2025250     91400   20.0000 -113.3500       8.4       163       124        60
OIR    2025250     91400   20.0000 -113.3600       8.5       163       122        60
OIR    2025250     91400   20.0000 -113.3700       8.5       163       120        60
OIR    2025250     91400   20.0000 -113.3800       8.5       163       121        60
OIR    2025250     91400   20.0000 -113.3900       8.5       163       123        60
OIR    2025250     91400   20.0000 -113.4000       8.6       163       124        60
OIR    2025250     91400   20.0000 -113.4100       8.7       164       124        60
OIR    2025250     91400   20.0000 -113.4200       8.8       164       123        60
OIR    2025250     91400   20.0000 -113.4300       8.9       164       122        60
OIR    2025250     91400   20.0000 -113.4400       9.1       164       121        60
OIR    2025250     91400   20.0000 -113.4500       9.4       165       121        60
OIR    2025250     91400   20.0000 -113.4600       9.7       165       120        60
OIR    2025250     91400   20.0000 -113.4700      10.1       165       120        60
OIR    2025250     91400   20.0000 -113.4800      10.6       164       119        60
OIR    2025250     91400   20.0000 -113.4900      11.1       164       117        60
OIR    2025250     91400   20.0000 -113.5000      11.4       163       119        60
OIR    2025250     91400   20.0000 -113.5100      11.7       163       120        60
OIR    2025250     91400   20.0000 -113.5200      11.9       163       120        60
OIR    2025250     91400   20.0000 -113.5300      12.1       162       121        60
OIR    2025250     91400   20.0000 -113.5400      12.2       162       121        60
OIR    2025250     91400   20.0000 -113.5500      12.4       162       120        60
OIR    2025250     91400   20.0000 -113.5600      12.6       162       120        60
OIR    2025250     91400   20.0000 -113.5700      12.7       162       117        60
OIR    2025250     91400   20.0000 -113.5800      12.8       162       116        60
OIR    2025250     91400   20.0000 -113.5900      12.9       162       117        60
OIR    2025250     91400   20.0000 -113.6000      12.9       162       119        60
OIR    2025250     91400   20.0000 -113.6100      12.9       162       120        60
OIR    2025250     91400   20.0000 -113.6200      12.9       162       119        60
OIR    2025250     91400   20.0000 -113.6300      12.9       162       116        60
OIR    2025250     91400   20.0000 -113.6400      12.9       162       116        60
OIR    2025250     91400   20.0000 -113.6500      13.0       162       114        60
OIR    2025250     91400   20.0000 -113.6600      12.9       162       114        60
OIR    2025250     91400   20.0000 -113.6700      12.9       162       115        60
OIR    2025250     91400   20.0000 -113.6800      12.9       162       115        60
OIR    2025250     91400   20.0000 -113.6900      12.9       162       115        60
OIR    2025250     91400   20.0000 -113.7000      12.7       162       114        60
OIR    2025250     91400   20.0000 -113.7100      12.3       162       112        60
OIR    2025250     91400   20.0000 -113.7200      11.2       164       110        60
OIR    2025250     91400   20.0000 -113.7300      10.8       165       110        60
OIR    2025250     91400   20.0000 -113.7400      10.8       165       109        60
OIR    2025250     91400   20.0000 -113.7500      11.1       166       109        60
OIR    2025250     91400   20.0000 -113.7600      11.1       166       109        60
OIR    2025250     91400   20.0000 -113.7700      10.9       167       109        60
OIR    2025250     91400   20.0000 -113.7800      10.7       168       110        60
OIR    2025250     91400   20.0000 -113.7900      10.6       168       111        60
OIR    2025250     91400   20.0000 -113.8000      10.4       168       111        60
OIR    2025250     91400   20.0000 -113.8100      10.3       168       111        60
OIR    2025250     91400   20.0000 -113.8200      10.2       168       111        60
OIR    2025250     91400   20.0000 -113.8300      10.1       168       112        60
OIR    2025250     91400   20.0000 -113.8400      10.0       168       113        60
OIR    2025250     91400   20.0000 -113.8500       9.9       168       116        60
OIR    2025250     91400   20.0000 -113.8600       9.8       169       117        60
OIR    2025250     91400   20.0000 -113.8700       9.7       170       117        60
OIR    2025250     91400   20.0000 -113.8800       9.6       170       119        60
OIR    2025250     91400   20.0000 -113.8900       9.5       170       120        60
OIR    2025250     91400   20.0000 -113.9000       9.5       171       120        60
OIR    2025250     91400   20.0000 -113.9100       9.4       171       119        60
OIR    2025250     91400   20.0000 -113.9200       9.4       171       119        60
OIR    2025250     91400   20.0000 -113.9300       9.4       171       119        60
OIR    2025250     91400   20.0000 -113.9400       9.3       172       120        60
OIR    2025250     91400   20.0000 -113.9500       9.3       172       122        60
OIR    2025250     91400   20.0000 -113.9600       9.3       173       122        60
OIR    2025250     91400   20.0000 -113.9700       9.3       174       123        60
OIR    2025250     91400   20.0000 -113.9800       9.3       175       123        60
OIR    2025250     91400   20.0000 -113.9900       9.3       176       122        60
OIR    2025250     91400   20.0000 -114.0000       9.4       178       121        60
OIR    2025250     91400   20.0000 -114.0100       9.5       180       120        60
OIR    2025250     91400   20.0000 -114.0200       9.7       181       119        60
OIR    2025250     91400   20.0000 -114.0300       9.8       182       120        60
OIR    2025250     91400   20.0000 -114.0400       9.9       183       120        60
OIR    2025250     91400   20.0000 -114.0500      10.0       183       123        60
OIR    2025250     91400   20.0000 -114.0600      10.0       184       125        60
OIR    2025250     91400   20.0000 -114.0700      10.0       184       126        60
OIR    2025250     91400   20.0000 -114.0800      10.1       184       127        60
OIR    2025250     91400   20.0000 -114.0900      10.1       185       127        60
OIR    2025250     91400   20.0000 -114.1000      10.1       185       127        60
OIR    2025250     91400   20.0000 -114.1100      10.1       186       127        60
OIR    2025250     91400   20.0000 -114.1200      10.1       187       127        60
OIR    2025250     91400   20.0000 -114.1300      10.1       187       127        60
OIR    2025250     91400   20.0000 -114.1400      10.1       188       128        60
OIR    2025250     91400   20.0000 -114.1500      10.1       188       128        60
OIR    2025250     91400   20.0000 -114.1600      10.2       190       128        60
OIR    2025250     91400   20.0000 -114.1700      10.7       193       128        60
OIR    2025250     91400   20.0000 -114.1800      11.1       196       128        60
OIR    2025250     91400   20.0000 -114.1900      11.6       198       127        60
OIR    2025250     91400   20.0000 -114.2000      12.1       199       127        60
OIR    2025250     91400   20.0000 -114.2100      12.4       200       128        60
OIR    2025250     91400   20.0000 -114.2200      12.3       201       131        60
OIR    2025250     91400   20.0000 -114.2300      11.9       204       134        60
OIR    2025250     91400   20.0000 -114.2400      11.2       206       137        60
OIR    2025250     91400   20.0000 -114.2500       9.9       208       140        60
OIR    2025250     91400   20.0000 -116.1200      13.7       180       141        60
OIR    2025250     91400   20.0000 -116.1300      13.8       182       141        60
OIR    2025250     91400   20.0000 -116.1400      13.8       184       142        60
OIR    2025250     91400   20.0000 -116.1600      14.0       185       142        60
OIR    2025250     91400   20.0000 -116.1700      14.0       186       141        60
OIR    2025250     91400   20.0000 -116.1800      14.0       186       139        60
OIR    2025250     91400   20.0000 -116.1900      14.0       186       137        60
OIR    2025250     91400   20.0000 -116.2000      14.0       187       138        60
OIR    2025250     91400   20.0000 -116.2100      14.0       187       141        60
OIR    2025250     91400   19.9900 -112.9000      11.1       137       139        60
OIR    2025250     91400   19.9900 -112.9100      10.9       137       138        60
OIR    2025250     91400   19.9900 -112.9200      10.7       137       137        60
OIR    2025250     91400   19.9900 -112.9300      10.6       137       136        60
OIR    2025250     91400   19.9900 -112.9400      10.6       137       135        60
OIR    2025250     91400   19.9900 -112.9500      10.6       137       135        60
OIR    2025250     91400   19.9900 -112.9600      10.5       137       134        60
OIR    2025250     91400   19.9900 -112.9700      10.5       138       134        60
OIR    2025250     91400   19.9900 -112.9800      10.5       138       134        60
OIR    2025250     91400   19.9900 -112.9900      10.5       138       133        60
OIR    2025250     91400   19.9900 -113.0000      10.4       138       132        60
OIR    2025250     91400   19.9900 -113.0100      10.3       138       132        60
OIR    2025250     91400   19.9900 -113.0200      10.2       138       132        60
OIR    2025250     91400   19.9900 -113.0300      10.2       138       132        60
OIR    2025250     91400   19.9900 -113.0400      10.1       138       131        60
OIR    2025250     91400   19.9900 -113.0500      10.0       139       130        60
OIR    2025250     91400   19.9900 -113.0600       9.9       139       130        60
OIR    2025250     91400   19.9900 -113.0700       9.9       139       131        60
OIR    2025250     91400   19.9900 -113.0800       9.9       139       131        60
OIR    2025250     91400   19.9900 -113.0900       9.8       139       132        60
OIR    2025250     91400   19.9900 -113.1000       9.6       139       132        60
OIR    2025250     91400   19.9900 -113.1100       9.5       140       131        60
OIR    2025250     91400   19.9900 -113.1200       9.3       141       130        60
OIR    2025250     91400   19.9900 -113.1300       9.1       143       130        60
OIR    2025250     91400   19.9900 -113.1400       8.6       146       131        60
OIR    2025250     91400   19.9900 -113.1500       8.2       150       130        60
OIR    2025250     91400   19.9900 -113.1600       7.9       153       128        60
OIR    2025250     91400   19.9900 -113.1700       7.9       156       128        60
OIR    2025250     91400   19.9900 -113.1800       7.9       157       129        60
OIR    2025250     91400   19.9900 -113.1900       7.9       158       129        60
OIR    2025250     91400   19.9900 -113.2000       7.9       159       128        60
OIR    2025250     91400   19.9900 -113.2100       8.0       160       126        60
OIR    2025250     91400   19.9900 -113.2200       8.0       161       125        60
OIR    2025250     91400   19.9900 -113.2300       8.1       162       124        60
OIR    2025250     91400   19.9900 -113.2400       8.2       162       123        60
OIR    2025250     91400   19.9900 -113.2500       8.3       162       123        60
OIR    2025250     91400   19.9900 -113.2600       8.3       163       124        60
OIR    2025250     91400   19.9900 -113.2700       8.3       163       123        60
OIR    2025250     91400   19.9900 -113.2800       8.3       163       123        60
OIR    2025250     91400   19.9900 -113.2900       8.3       163       123        60
OIR    2025250     91400   19.9900 -113.3000       8.3       163       122        60
OIR    2025250     91400   19.9900 -113.3100       8.4       163       122        60
OIR    2025250     91400   19.9900 -113.3200       8.4       163       122        60
OIR    2025250     91400   19.9900 -113.3300       8.4       163       123        60
OIR    2025250     91400   19.9900 -113.3400       8.4       163       124        60
OIR    2025250     91400   19.9900 -113.3500       8.4       163       125        60
OIR    2025250     91400   19.9900 -113.3600       8.4       163       123        60
OIR    2025250     91400   19.9900 -113.3700       8.5       163       120        60
OIR    2025250     91400   19.9900 -113.3800       8.5       164       120        60
OIR    2025250     91400   19.9900 -113.3900       8.5       164       121        60
OIR    2025250     91400   19.9900 -113.4000       8.5       164       122        60
OIR    2025250     91400   19.9900 -113.4100       8.6       164       122        60
OIR    2025250     91400   19.9900 -113.4200       8.7       165       122        60
OIR    2025250     91400   19.9900 -113.4300       8.8       165       122        60
OIR    2025250     91400   19.9900 -113.4400       8.9       165       121        60
OIR    2025250     91400   19.9900 -113.4500       9.2       165       120        60
OIR    2025250     91400   19.9900 -113.4600       9.5       166       120        60
OIR    2025250     91400   19.9900 -113.4700       9.9       165       119        60
OIR    2025250     91400   19.9900 -113.4800      10.4       165       119        60
OIR    2025250     91400   19.9900 -113.4900      10.9       164       119        60
OIR    2025250     91400   19.9900 -113.5000      11.3       164       119        60
OIR    2025250     91400   19.9900 -113.5100      11.5       163       119        60
OIR    2025250     91400   19.9900 -113.5200      11.7       163       119        60
OIR    2025250     91400   19.9900 -113.5300      11.9       162       120        60
OIR    2025250     91400   19.9900 -113.5400      12.2       162       120        60
OIR    2025250     91400   19.9900 -113.5500      12.4       162       119        60
OIR    2025250     91400   19.9900 -113.5600      12.6       162       119        60
OIR    2025250     91400   19.9900 -113.5700      12.7       162       116        60
OIR    2025250     91400   19.9900 -113.5800      12.8       162       116        60
OIR    2025250     91400   19.9900 -113.5900      12.9       162       116        60
OIR    2025250     91400   19.9900 -113.6000      12.9       162       117        60
OIR    2025250     91400   19.9900 -113.6100      12.9       162       119        60
OIR    2025250     91400   19.9900 -113.6200      13.0       162       116        60
OIR    2025250     91400   19.9900 -113.6300      13.0       162       114        60
OIR    2025250     91400   19.9900 -113.6400      13.0       162       113        60
OIR    2025250     91400   19.9900 -113.6500      13.0       162       111        60
OIR    2025250     91400   19.9900 -113.6600      13.0       162       112        60
OIR    2025250     91400   19.9900 -113.6700      12.9       162       112        60
OIR    2025250     91400   19.9900 -113.6800      12.9       162       112        60
OIR    2025250     91400   19.9900 -113.6900      12.8       162       111        60
OIR    2025250     91400   19.9900 -113.7000      12.5       162       109        60
OIR    2025250     91400   19.9900 -113.7100      11.8       163       109        60
OIR    2025250     91400   19.9900 -113.7200      10.7       165       108        60
OIR    2025250     91400   19.9900 -113.7300      10.4       166       109        60
OIR    2025250     91400   19.9900 -113.7400      10.4       167       109        60
OIR    2025250     91400   19.9900 -113.7500      10.4       167       109        60
OIR    2025250     91400   19.9900 -113.7600      10.4       168       110        60
OIR    2025250     91400   19.9900 -113.7700      10.4       168       110        60
OIR    2025250     91400   19.9900 -113.7800      10.3       169       110        60
OIR    2025250     91400   19.9900 -113.7900      10.2       169       110        60
OIR    2025250     91400   19.9900 -113.8000      10.1       169       110        60
OIR    2025250     91400   19.9900 -113.8100      10.0       169       110        60
OIR    2025250     91400   19.9900 -113.8200      10.0       169       111        60
OIR    2025250     91400   19.9900 -113.8300       9.9       169       112        60
OIR    2025250     91400   19.9900 -113.8400       9.8       169       113        60
OIR    2025250     91400   19.9900 -113.8500       9.7       170       114        60
OIR    2025250     91400   19.9900 -113.8600       9.6       170       116        60
OIR    2025250     91400   19.9900 -113.8700       9.6       171       116        60
OIR    2025250     91400   19.9900 -113.8800       9.5       171       116        60
OIR    2025250     91400   19.9900 -113.8900       9.5       171       116        60
OIR    2025250     91400   19.9900 -113.9000       9.5       171       117        60
OIR    2025250     91400   19.9900 -113.9100       9.4       171       119        60
OIR    2025250     91400   19.9900 -113.9200       9.4       171       117        60
OIR    2025250     91400   19.9900 -113.9300       9.4       172       117        60
OIR    2025250     91400   19.9900 -113.9400       9.3       172       117        60
OIR    2025250     91400   19.9900 -113.9500       9.3       173       119        60
OIR    2025250     91400   19.9900 -113.9600       9.3       173       120        60
OIR    2025250     91400   19.9900 -113.9700       9.3       174       121        60
OIR    2025250     91400   19.9900 -113.9800       9.3       175       121        60
OIR    2025250     91400   19.9900 -113.9900       9.3       176       120        60
OIR    2025250     91400   19.9900 -114.0000       9.4       178       119        60
OIR    2025250     91400   19.9900 -114.0100       9.5       180       117        60
OIR    2025250     91400   19.9900 -114.0200       9.6       181       116        60
OIR    2025250     91400   19.9900 -114.0300       9.8       182       117        60
OIR    2025250     91400   19.9900 -114.0400       9.9       183       117        60
OIR    2025250     91400   19.9900 -114.0500       9.9       183       120        60
OIR    2025250     91400   19.9900 -114.0600      10.0       184       123        60
OIR    2025250     91400   19.9900 -114.0700      10.0       184       125        60
OIR    2025250     91400   19.9900 -114.0800      10.1       184       125        60
OIR    2025250     91400   19.9900 -114.0900      10.1       185       125        60
OIR    2025250     91400   19.9900 -114.1000      10.1       185       125        60
OIR    2025250     91400   19.9900 -114.1100      10.1       186       126        60
OIR    2025250     91400   19.9900 -114.1200      10.1       186       126        60
OIR    2025250     91400   19.9900 -114.1300      10.0       187       126        60
OIR    2025250     91400   19.9900 -114.1400      10.1       188       126        60
OIR    2025250     91400   19.9900 -114.1500      10.1       188       126        60
OIR    2025250     91400   19.9900 -114.1600      10.1       189       126        60
OIR    2025250     91400   19.9900 -114.1700      10.2       191       126        60
OIR    2025250     91400   19.9900 -114.1800      10.5       195       126        60
OIR    2025250     91400   19.9900 -114.1900      10.6       198       125        60
OIR    2025250     91400   19.9900 -114.2000      10.9       200       124        60
OIR    2025250     91400   19.9900 -114.2100      11.1       203       125        60
OIR    2025250     91400   19.9900 -114.2200      11.2       204       128        60
OIR    2025250     91400   19.9900 -114.2300      10.9       206       131        60
OIR    2025250     91400   19.9900 -114.2400      10.4       208       133        60
OIR    2025250     91400   19.9900 -114.2500       9.6       210       135        60
OIR    2025250     91400   19.9900 -114.2600       9.4       211       137        60
OIR    2025250     91400   19.9900 -114.2700       9.3       212       140        60
OIR    2025250     91400   19.9900 -116.1200      13.5       178       141        60
OIR    2025250     91400   19.9900 -116.1300      13.5       180       141        60
OIR    2025250     91400   19.9900 -116.1700      13.8       185       142        60
OIR    2025250     91400   19.9900 -116.1800      13.9       186       140        60
OIR    2025250     91400   19.9900 -116.1900      13.9       186       139        60
OIR    2025250     91400   19.9900 -116.2000      13.9       186       139        60
OIR    2025250     91400   19.9900 -116.2100      13.9       187       140        60
OIR    2025250     91400   19.9900 -116.2200      13.9       187       141        60
OIR    2025250     91400   19.9800 -112.8900      11.8       135       138        60
OIR    2025250     91400   19.9800 -112.9000      11.1       136       138        60
OIR    2025250     91400   19.9800 -112.9100      10.9       136       137        60
OIR    2025250     91400   19.9800 -112.9200      10.7       136       136        60
OIR    2025250     91400   19.9800 -112.9300      10.6       137       135        60
OIR    2025250     91400   19.9800 -112.9400      10.5       137       135        60
OIR    2025250     91400   19.9800 -112.9500      10.5       137       135        60
OIR    2025250     91400   19.9800 -112.9600      10.5       137       134        60
OIR    2025250     91400   19.9800 -112.9700      10.4       137       134        60
OIR    2025250     91400   19.9800 -112.9800      10.4       138       134        60
OIR    2025250     91400   19.9800 -112.9900      10.3       138       134        60
OIR    2025250     91400   19.9800 -113.0000      10.2       138       133        60
OIR    2025250     91400   19.9800 -113.0100      10.1       138       133        60
OIR    2025250     91400   19.9800 -113.0200      10.1       138       133        60
OIR    2025250     91400   19.9800 -113.0300      10.0       139       133        60
OIR    2025250     91400   19.9800 -113.0400       9.9       139       132        60
OIR    2025250     91400   19.9800 -113.0500       9.8       139       132        60
OIR    2025250     91400   19.9800 -113.0600       9.7       139       131        60
OIR    2025250     91400   19.9800 -113.0700       9.7       140       130        60
OIR    2025250     91400   19.9800 -113.0800       9.6       140       130        60
OIR    2025250     91400   19.9800 -113.0900       9.5       140       132        60
OIR    2025250     91400   19.9800 -113.1000       9.4       141       133        60
OIR    2025250     91400   19.9800 -113.1100       9.2       143       132        60
OIR    2025250     91400   19.9800 -113.1200       9.0       144       132        60
OIR    2025250     91400   19.9800 -113.1300       8.7       147       131        60
OIR    2025250     91400   19.9800 -113.1400       8.4       150       131        60
OIR    2025250     91400   19.9800 -113.1500       8.0       154       130        60
OIR    2025250     91400   19.9800 -113.1600       7.9       156       128        60
OIR    2025250     91400   19.9800 -113.1700       7.8       158       126        60
OIR    2025250     91400   19.9800 -113.1800       7.9       158       128        60
OIR    2025250     91400   19.9800 -113.1900       7.9       159       130        60
OIR    2025250     91400   19.9800 -113.2000       7.9       160       128        60
OIR    2025250     91400   19.9800 -113.2100       8.0       161       126        60
OIR    2025250     91400   19.9800 -113.2200       8.0       162       124        60
OIR    2025250     91400   19.9800 -113.2300       8.1       162       123        60
OIR    2025250     91400   19.9800 -113.2400       8.1       163       122        60
OIR    2025250     91400   19.9800 -113.2500       8.2       163       123        60
OIR    2025250     91400   19.9800 -113.2600       8.2       163       124        60
OIR    2025250     91400   19.9800 -113.2700       8.2       163       123        60
OIR    2025250     91400   19.9800 -113.2800       8.3       163       123        60
OIR    2025250     91400   19.9800 -113.2900       8.3       163       122        60
OIR    2025250     91400   19.9800 -113.3000       8.3       163       122        60
OIR    2025250     91400   19.9800 -113.3100       8.3       163       121        60
OIR    2025250     91400   19.9800 -113.3200       8.3       164       122        60
OIR    2025250     91400   19.9800 -113.3300       8.4       164       123        60
OIR    2025250     91400   19.9800 -113.3400       8.4       164       123        60
OIR    2025250     91400   19.9800 -113.3500       8.4       164       124        60
OIR    2025250     91400   19.9800 -113.3600       8.4       164       123        60
OIR    2025250     91400   19.9800 -113.3700       8.4       164       122        60
OIR    2025250     91400   19.9800 -113.3800       8.5       164       121        60
OIR    2025250     91400   19.9800 -113.3900       8.5       164       121        60
OIR    2025250     91400   19.9800 -113.4000       8.5       165       121        60
OIR    2025250     91400   19.9800 -113.4100       8.6       165       121        60
OIR    2025250     91400   19.9800 -113.4200       8.6       165       121        60
OIR    2025250     91400   19.9800 -113.4300       8.7       165       121        60
OIR    2025250     91400   19.9800 -113.4400       8.8       165       121        60
OIR    2025250     91400   19.9800 -113.4500       9.0       166       120        60
OIR    2025250     91400   19.9800 -113.4600       9.4       166       119        60
OIR    2025250     91400   19.9800 -113.4700       9.8       166       116        60
OIR    2025250     91400   19.9800 -113.4800      10.2       165       116        60
OIR    2025250     91400   19.9800 -113.4900      10.7       165       116        60
OIR    2025250     91400   19.9800 -113.5000      11.2       164       116        60
OIR    2025250     91400   19.9800 -113.5100      11.4       163       116        60
OIR    2025250     91400   19.9800 -113.5200      11.6       163       117        60
OIR    2025250     91400   19.9800 -113.5300      11.8       163       119        60
OIR    2025250     91400   19.9800 -113.5400      12.1       162       119        60
OIR    2025250     91400   19.9800 -113.5500      12.4       162       117        60
OIR    2025250     91400   19.9800 -113.5600      12.6       162       116        60
OIR    2025250     91400   19.9800 -113.5700      12.7       162       115        60
OIR    2025250     91400   19.9800 -113.5800      12.8       162       113        60
OIR    2025250     91400   19.9800 -113.5900      12.9       162       113        60
OIR    2025250     91400   19.9800 -113.6000      12.9       162       115        60
OIR    2025250     91400   19.9800 -113.6100      12.9       162       116        60
OIR    2025250     91400   19.9800 -113.6200      13.0       162       114        60
OIR    2025250     91400   19.9800 -113.6300      13.0       162       112        60
OIR    2025250     91400   19.9800 -113.6400      13.0       162       110        60
OIR    2025250     91400   19.9800 -113.6500      13.0       162       109        60
OIR    2025250     91400   19.9800 -113.6600      13.0       162       109        60
OIR    2025250     91400   19.9800 -113.6700      12.9       162       109        60
OIR    2025250     91400   19.9800 -113.6800      12.9       162       110        60
OIR    2025250     91400   19.9800 -113.6900      12.6       162       108        60
OIR    2025250     91400   19.9800 -113.7000      11.6       163       107        60
OIR    2025250     91400   19.9800 -113.7100      10.6       165       107        60
OIR    2025250     91400   19.9800 -113.7200      10.3       166       107        60
OIR    2025250     91400   19.9800 -113.7300      10.2       166       108        60
OIR    2025250     91400   19.9800 -113.7400      10.2       167       108        60
OIR    2025250     91400   19.9800 -113.7500      10.1       168       109        60
OIR    2025250     91400   19.9800 -113.7600      10.0       168       111        60
OIR    2025250     91400   19.9800 -113.7700      10.0       169       112        60
OIR    2025250     91400   19.9800 -113.7800       9.9       169       110        60
OIR    2025250     91400   19.9800 -113.7900       9.8       170       109        60
OIR    2025250     91400   19.9800 -113.8000       9.8       170       109        60
OIR    2025250     91400   19.9800 -113.8100       9.7       170       110        60
OIR    2025250     91400   19.9800 -113.8200       9.7       170       111        60
OIR    2025250     91400   19.9800 -113.8300       9.6       170       111        60
OIR    2025250     91400   19.9800 -113.8400       9.6       170       112        60
OIR    2025250     91400   19.9800 -113.8500       9.6       171       113        60
OIR    2025250     91400   19.9800 -113.8600       9.5       171       113        60
OIR    2025250     91400   19.9800 -113.8700       9.5       171       113        60
OIR    2025250     91400   19.9800 -113.8800       9.5       171       113        60
OIR    2025250     91400   19.9800 -113.8900       9.5       171       114        60
OIR    2025250     91400   19.9800 -113.9000       9.5       171       116        60
OIR    2025250     91400   19.9800 -113.9100       9.5       171       117        60
OIR    2025250     91400   19.9800 -113.9200       9.4       172       117        60
OIR    2025250     91400   19.9800 -113.9300       9.4       172       119        60
OIR    2025250     91400   19.9800 -113.9400       9.4       173       117        60
OIR    2025250     91400   19.9800 -113.9500       9.3       173       116        60
OIR    2025250     91400   19.9800 -113.9600       9.3       174       116        60
OIR    2025250     91400   19.9800 -113.9700       9.3       175       117        60
OIR    2025250     91400   19.9800 -113.9800       9.3       175       119        60
OIR    2025250     91400   19.9800 -113.9900       9.3       177       119        60
OIR    2025250     91400   19.9800 -114.0000       9.4       178       119        60
OIR    2025250     91400   19.9800 -114.0100       9.5       179       117        60
OIR    2025250     91400   19.9800 -114.0200       9.6       180       117        60
OIR    2025250     91400   19.9800 -114.0300       9.7       181       117        60
OIR    2025250     91400   19.9800 -114.0400       9.8       182       117        60
OIR    2025250     91400   19.9800 -114.0500       9.9       183       119        60
OIR    2025250     91400   19.9800 -114.0600      10.0       184       121        60
OIR    2025250     91400   19.9800 -114.0700      10.0       184       122        60
OIR    2025250     91400   19.9800 -114.0800      10.0       184       123        60
OIR    2025250     91400   19.9800 -114.0900      10.1       185       123        60
OIR    2025250     91400   19.9800 -114.1000      10.1       185       123        60
OIR    2025250     91400   19.9800 -114.1100      10.1       186       123        60
OIR    2025250     91400   19.9800 -114.1200      10.0       186       122        60
OIR    2025250     91400   19.9800 -114.1300      10.0       187       122        60
OIR    2025250     91400   19.9800 -114.1400      10.0       188       122        60
OIR    2025250     91400   19.9800 -114.1500      10.1       188       123        60
OIR    2025250     91400   19.9800 -114.1600      10.0       189       124        60
OIR    2025250     91400   19.9800 -114.1700      10.0       191       125        60
OIR    2025250     91400   19.9800 -114.1800      10.0       195       126        60
OIR    2025250     91400   19.9800 -114.1900      10.0       198       126        60
OIR    2025250     91400   19.9800 -114.2000       9.9       201       125        60
OIR    2025250     91400   19.9800 -114.2100       9.9       205       126        60
OIR    2025250     91400   19.9800 -114.2200      10.0       207       127        60
OIR    2025250     91400   19.9800 -114.2300      10.1       208       129        60
OIR    2025250     91400   19.9800 -114.2400       9.8       210       130        60
OIR    2025250     91400   19.9800 -114.2500       9.6       211       132        60
OIR    2025250     91400   19.9800 -114.2600       9.4       212       134        60
OIR    2025250     91400   19.9800 -114.2700       9.4       212       136        60
OIR    2025250     91400   19.9800 -114.2800       9.2       213       138        60
OIR    2025250     91400   19.9800 -116.1100      13.1       176       142        60
OIR    2025250     91400   19.9800 -116.1200      13.1       177       141        60
OIR    2025250     91400   19.9800 -116.1300      13.1       178       140        60
OIR    2025250     91400   19.9800 -116.1800      13.5       184       141        60
OIR    2025250     91400   19.9800 -116.1900      13.5       184       140        60
OIR    2025250     91400   19.9800 -116.2000      13.5       185       139        60
OIR    2025250     91400   19.9800 -116.2100      13.6       186       140        60
OIR    2025250     91400   19.9800 -116.2200      13.6       186       141        60
OIR    2025250     91400   19.9700 -112.2600       5.1        86       140        60
OIR    2025250     91400   19.9700 -112.2700       5.6        89       140        60
OIR    2025250     91400   19.9700 -112.2800       6.3        90       140        60
OIR    2025250     91400   19.9700 -112.8500      14.6       137       139        60
OIR    2025250     91400   19.9700 -112.8800      12.7       135       139        60
OIR    2025250     91400   19.9700 -112.8900      11.8       134       136        60
OIR    2025250     91400   19.9700 -112.9000      11.2       135       135        60
OIR    2025250     91400   19.9700 -112.9100      10.8       135       136        60
OIR    2025250     91400   19.9700 -112.9200      10.7       136       135        60
OIR    2025250     91400   19.9700 -112.9300      10.6       136       135        60
OIR    2025250     91400   19.9700 -112.9400      10.5       137       134        60
OIR    2025250     91400   19.9700 -112.9500      10.4       137       134        60
OIR    2025250     91400   19.9700 -112.9600      10.4       137       134        60
OIR    2025250     91400   19.9700 -112.9700      10.3       137       134        60
OIR    2025250     91400   19.9700 -112.9800      10.2       138       134        60
OIR    2025250     91400   19.9700 -112.9900      10.1       138       134        60
OIR    2025250     91400   19.9700 -113.0000      10.0       138       133        60
OIR    2025250     91400   19.9700 -113.0100       9.9       138       133        60
OIR    2025250     91400   19.9700 -113.0200       9.8       138       132        60
OIR    2025250     91400   19.9700 -113.0300       9.7       139       132        60
OIR    2025250     91400   19.9700 -113.0400       9.6       139       132        60
OIR    2025250     91400   19.9700 -113.0500       9.5       140       131        60
OIR    2025250     91400   19.9700 -113.0600       9.5       140       130        60
OIR    2025250     91400   19.9700 -113.0700       9.4       141       128        60
OIR    2025250     91400   19.9700 -113.0800       9.4       141       127        60
OIR    2025250     91400   19.9700 -113.0900       9.3       142       130        60
OIR    2025250     91400   19.9700 -113.1000       9.1       144       132        60
OIR    2025250     91400   19.9700 -113.1100       8.8       146       131        60
OIR    2025250     91400   19.9700 -113.1200       8.6       148       131        60
OIR    2025250     91400   19.9700 -113.1300       8.3       151       131        60
OIR    2025250     91400   19.9700 -113.1400       8.1       154       131        60
OIR    2025250     91400   19.9700 -113.1500       7.9       156       131        60
OIR    2025250     91400   19.9700 -113.1600       7.9       158       129        60
OIR    2025250     91400   19.9700 -113.1700       7.9       159       127        60
OIR    2025250     91400   19.9700 -113.1800       7.9       159       127        60
OIR    2025250     91400   19.9700 -113.1900       7.9       160       128        60
OIR    2025250     91400   19.9700 -113.2000       7.9       161       127        60
OIR    2025250     91400   19.9700 -113.2100       8.0       162       126        60
OIR    2025250     91400   19.9700 -113.2200       8.0       163       124        60
OIR    2025250     91400   19.9700 -113.2300       8.1       163       124        60
OIR    2025250     91400   19.9700 -113.2400       8.1       163       123        60
OIR    2025250     91400   19.9700 -113.2500       8.1       163       123        60
OIR    2025250     91400   19.9700 -113.2600       8.2       164       123        60
OIR    2025250     91400   19.9700 -113.2700       8.2       164       123        60
OIR    2025250     91400   19.9700 -113.2800       8.2       164       121        60
OIR    2025250     91400   19.9700 -113.2900       8.3       164       121        60
OIR    2025250     91400   19.9700 -113.3000       8.3       164       121        60
OIR    2025250     91400   19.9700 -113.3100       8.3       164       121        60
OIR    2025250     91400   19.9700 -113.3200       8.3       164       122        60
OIR    2025250     91400   19.9700 -113.3300       8.3       164       123        60
OIR    2025250     91400   19.9700 -113.3400       8.3       164       123        60
OIR    2025250     91400   19.9700 -113.3500       8.4       164       123        60
OIR    2025250     91400   19.9700 -113.3600       8.4       164       122        60
OIR    2025250     91400   19.9700 -113.3700       8.4       164       121        60
OIR    2025250     91400   19.9700 -113.3800       8.4       165       121        60
OIR    2025250     91400   19.9700 -113.3900       8.5       165       120        60
OIR    2025250     91400   19.9700 -113.4000       8.5       165       120        60
OIR    2025250     91400   19.9700 -113.4100       8.5       165       120        60
OIR    2025250     91400   19.9700 -113.4200       8.6       165       120        60
OIR    2025250     91400   19.9700 -113.4300       8.6       166       120        60
OIR    2025250     91400   19.9700 -113.4400       8.7       166       119        60
OIR    2025250     91400   19.9700 -113.4500       8.9       166       119        60
OIR    2025250     91400   19.9700 -113.4600       9.3       166       116        60
OIR    2025250     91400   19.9700 -113.4700       9.7       166       116        60
OIR    2025250     91400   19.9700 -113.4800      10.1       166       115        60
OIR    2025250     91400   19.9700 -113.4900      10.6       165       114        60
OIR    2025250     91400   19.9700 -113.5000      11.0       164       113        60
OIR    2025250     91400   19.9700 -113.5100      11.3       163       115        60
OIR    2025250     91400   19.9700 -113.5200      11.5       163       116        60
OIR    2025250     91400   19.9700 -113.5300      11.8       163       117        60
OIR    2025250     91400   19.9700 -113.5400      12.0       162       117        60
OIR    2025250     91400   19.9700 -113.5500      12.3       162       116        60
OIR    2025250     91400   19.9700 -113.5600      12.6       162       114        60
OIR    2025250     91400   19.9700 -113.5700      12.7       162       112        60
OIR    2025250     91400   19.9700 -113.5800      12.8       162       111        60
OIR    2025250     91400   19.9700 -113.5900      12.9       162       110        60
OIR    2025250     91400   19.9700 -113.6000      12.9       162       112        60
OIR    2025250     91400   19.9700 -113.6100      12.9       162       113        60
OIR    2025250     91400   19.9700 -113.6200      13.0       162       111        60
OIR    2025250     91400   19.9700 -113.6300      13.0       162       109        60
OIR    2025250     91400   19.9700 -113.6400      13.0       162       108        60
OIR    2025250     91400   19.9700 -113.6500      13.0       162       107        60
OIR    2025250     91400   19.9700 -113.6600      12.9       162       105        60
OIR    2025250     91400   19.9700 -113.6700      12.9       162       107        60
OIR    2025250     91400   19.9700 -113.6800      12.7       162       107        60
OIR    2025250     91400   19.9700 -113.6900      12.0       163       107        60
OIR    2025250     91400   19.9700 -113.7000      10.7       165       105        60
OIR    2025250     91400   19.9700 -113.7100      10.2       166       107        60
OIR    2025250     91400   19.9700 -113.7200      10.1       166       109        60
OIR    2025250     91400   19.9700 -113.7300      10.0       167       110        60
OIR    2025250     91400   19.9700 -113.7400       9.9       168       110        60
OIR    2025250     91400   19.9700 -113.7500       9.9       169       111        60
OIR    2025250     91400   19.9700 -113.7600       9.8       169       111        60
OIR    2025250     91400   19.9700 -113.7700       9.7       170       111        60
OIR    2025250     91400   19.9700 -113.7800       9.6       170       110        60
OIR    2025250     91400   19.9700 -113.7900       9.5       171       108        60
OIR    2025250     91400   19.9700 -113.8000       9.5       171       108        60
OIR    2025250     91400   19.9700 -113.8100       9.5       171       109        60
OIR    2025250     91400   19.9700 -113.8200       9.5       171       110        60
OIR    2025250     91400   19.9700 -113.8300       9.5       171       111        60
OIR    2025250     91400   19.9700 -113.8400       9.5       171       113        60
OIR    2025250     91400   19.9700 -113.8500       9.5       171       113        60
OIR    2025250     91400   19.9700 -113.8600       9.5       171       114        60
OIR    2025250     91400   19.9700 -113.8700       9.5       171       114        60
OIR    2025250     91400   19.9700 -113.8800       9.5       171       114        60
OIR    2025250     91400   19.9700 -113.8900       9.5       171       114        60
OIR    2025250     91400   19.9700 -113.9000       9.5       172       115        60
OIR    2025250     91400   19.9700 -113.9100       9.5       172       116        60
OIR    2025250     91400   19.9700 -113.9200       9.4       172       116        60
OIR    2025250     91400   19.9700 -113.9300       9.4       173       117        60
OIR    2025250     91400   19.9700 -113.9400       9.4       173       116        60
OIR    2025250     91400   19.9700 -113.9500       9.4       173       116        60
OIR    2025250     91400   19.9700 -113.9600       9.3       174       116        60
OIR    2025250     91400   19.9700 -113.9700       9.3       175       116        60
OIR    2025250     91400   19.9700 -113.9800       9.3       176       117        60
OIR    2025250     91400   19.9700 -113.9900       9.3       177       117        60
OIR    2025250     91400   19.9700 -114.0000       9.4       178       117        60
OIR    2025250     91400   19.9700 -114.0100       9.4       179       117        60
OIR    2025250     91400   19.9700 -114.0200       9.5       180       117        60
OIR    2025250     91400   19.9700 -114.0300       9.6       181       117        60
OIR    2025250     91400   19.9700 -114.0400       9.7       182       117        60
OIR    2025250     91400   19.9700 -114.0500       9.8       183       117        60
OIR    2025250     91400   19.9700 -114.0600       9.9       183       119        60
OIR    2025250     91400   19.9700 -114.0700      10.0       184       120        60
OIR    2025250     91400   19.9700 -114.0800      10.0       184       120        60
OIR    2025250     91400   19.9700 -114.0900      10.0       185       120        60
OIR    2025250     91400   19.9700 -114.1000      10.1       185       120        60
OIR    2025250     91400   19.9700 -114.1100      10.0       186       120        60
OIR    2025250     91400   19.9700 -114.1200      10.0       187       119        60
OIR    2025250     91400   19.9700 -114.1300      10.0       187       119        60
OIR    2025250     91400   19.9700 -114.1400      10.0       188       119        60
OIR    2025250     91400   19.9700 -114.1500      10.0       188       120        60
OIR    2025250     91400   19.9700 -114.1600      10.0       189       122        60
OIR    2025250     91400   19.9700 -114.1700       9.9       191       124        60
OIR    2025250     91400   19.9700 -114.1800       9.7       195       125        60
OIR    2025250     91400   19.9700 -114.1900       9.6       199       126        60
OIR    2025250     91400   19.9700 -114.2000       9.4       204       127        60
OIR    2025250     91400   19.9700 -114.2100       9.4       207       128        60
OIR    2025250     91400   19.9700 -114.2200       9.5       209       128        60
OIR    2025250     91400   19.9700 -114.2300       9.5       210       128        60
OIR    2025250     91400   19.9700 -114.2400       9.5       211       128        60
OIR    2025250     91400   19.9700 -114.2500       9.4       212       129        60
OIR    2025250     91400   19.9700 -114.2600       9.4       213       130        60
OIR    2025250     91400   19.9700 -114.2700       9.4       213       133        60
OIR    2025250     91400   19.9700 -114.2800       9.3       213       136        60
OIR    2025250     91400   19.9700 -114.2900       9.0       214       137        60
OIR    2025250     91400   19.9700 -114.3000       8.8       215       138        60
OIR    2025250     91400   19.9700 -114.3100       8.8       216       137        60
OIR    2025250     91400   19.9700 -114.3200       8.8       216       136        60
OIR    2025250     91400   19.9700 -114.3300       8.8       217       137        60
OIR    2025250     91400   19.9700 -114.3400       8.8       217       139        60
OIR    2025250     91400   19.9700 -116.1100      12.9       176       142        60
OIR    2025250     91400   19.9700 -116.1200      12.8       176       141        60
OIR    2025250     91400   19.9700 -116.1300      12.8       177       140        60
OIR    2025250     91400   19.9700 -116.1800      13.3       182       142        60
OIR    2025250     91400   19.9700 -116.1900      13.2       183       141        60
OIR    2025250     91400   19.9700 -116.2000      13.3       184       139        60
OIR    2025250     91400   19.9700 -116.2100      13.4       185       140        60
OIR    2025250     91400   19.9700 -116.2200      13.4       186       141        60
OIR    2025250     91400   19.9600 -112.1700       5.5        60       140        60
OIR    2025250     91400   19.9600 -112.2300       4.2        83       140        60
OIR    2025250     91400   19.9600 -112.2400       4.8        89       139        60
OIR    2025250     91400   19.9600 -112.2500       5.3        91       139        60
OIR    2025250     91400   19.9600 -112.2600       5.5        92       138        60
OIR    2025250     91400   19.9600 -112.2700       5.8        93       139        60
OIR    2025250     91400   19.9600 -112.2800       6.3        93       139        60
OIR    2025250     91400   19.9600 -112.2900       7.1        92       140        60
OIR    2025250     91400   19.9600 -112.8400      14.4       133       138        60
OIR    2025250     91400   19.9600 -112.8500      14.0       134       135        60
OIR    2025250     91400   19.9600 -112.8600      13.3       132       136        60
OIR    2025250     91400   19.9600 -112.8700      12.7       131       137        60
OIR    2025250     91400   19.9600 -112.8800      12.3       132       136        60
OIR    2025250     91400   19.9600 -112.8900      11.6       133       135        60
OIR    2025250     91400   19.9600 -112.9000      11.1       133       135        60
OIR    2025250     91400   19.9600 -112.9100      10.8       134       135        60
OIR    2025250     91400   19.9600 -112.9200      10.6       135       135        60
OIR    2025250     91400   19.9600 -112.9300      10.5       136       135        60
OIR    2025250     91400   19.9600 -112.9400      10.4       136       134        60
OIR    2025250     91400   19.9600 -112.9500      10.3       137       134        60
OIR    2025250     91400   19.9600 -112.9600      10.2       137       134        60
OIR    2025250     91400   19.9600 -112.9700      10.2       137       134        60
OIR    2025250     91400   19.9600 -112.9800      10.0       138       134        60
OIR    2025250     91400   19.9600 -112.9900       9.9       138       134        60
OIR    2025250     91400   19.9600 -113.0000       9.8       138       134        60
OIR    2025250     91400   19.9600 -113.0100       9.7       138       134        60
OIR    2025250     91400   19.9600 -113.0200       9.6       139       133        60
OIR    2025250     91400   19.9600 -113.0300       9.5       139       132        60
OIR    2025250     91400   19.9600 -113.0400       9.4       140       131        60
OIR    2025250     91400   19.9600 -113.0500       9.3       140       130        60
OIR    2025250     91400   19.9600 -113.0600       9.3       141       130        60
OIR    2025250     91400   19.9600 -113.0700       9.2       141       128        60
OIR    2025250     91400   19.9600 -113.0800       9.1       143       126        60
OIR    2025250     91400   19.9600 -113.0900       8.9       145       128        60
OIR    2025250     91400   19.9600 -113.1000       8.7       147       130        60
OIR    2025250     91400   19.9600 -113.1100       8.4       150       130        60
OIR    2025250     91400   19.9600 -113.1200       8.2       152       130        60
OIR    2025250     91400   19.9600 -113.1300       8.0       155       130        60
OIR    2025250     91400   19.9600 -113.1400       7.9       157       130        60
OIR    2025250     91400   19.9600 -113.1500       7.8       158       130        60
OIR    2025250     91400   19.9600 -113.1600       7.8       159       130        60
OIR    2025250     91400   19.9600 -113.1700       7.8       160       129        60
OIR    2025250     91400   19.9600 -113.1800       7.9       161       128        60
OIR    2025250     91400   19.9600 -113.1900       7.9       161       126        60
OIR    2025250     91400   19.9600 -113.2000       7.9       162       126        60
OIR    2025250     91400   19.9600 -113.2100       8.0       163       125        60
OIR    2025250     91400   19.9600 -113.2200       8.0       163       124        60
OIR    2025250     91400   19.9600 -113.2300       8.1       163       124        60
OIR    2025250     91400   19.9600 -113.2400       8.1       164       124        60
OIR    2025250     91400   19.9600 -113.2500       8.1       164       124        60
OIR    2025250     91400   19.9600 -113.2600       8.2       164       123        60
OIR    2025250     91400   19.9600 -113.2700       8.2       164       122        60
OIR    2025250     91400   19.9600 -113.2800       8.2       164       120        60
OIR    2025250     91400   19.9600 -113.2900       8.2       164       117        60
OIR    2025250     91400   19.9600 -113.3000       8.3       164       120        60
OIR    2025250     91400   19.9600 -113.3100       8.3       164       121        60
OIR    2025250     91400   19.9600 -113.3200       8.3       164       121        60
OIR    2025250     91400   19.9600 -113.3300       8.3       164       122        60
OIR    2025250     91400   19.9600 -113.3400       8.3       164       122        60
OIR    2025250     91400   19.9600 -113.3500       8.3       164       121        60
OIR    2025250     91400   19.9600 -113.3600       8.4       164       120        60
OIR    2025250     91400   19.9600 -113.3700       8.4       165       120        60
OIR    2025250     91400   19.9600 -113.3800       8.4       165       119        60
OIR    2025250     91400   19.9600 -113.3900       8.4       165       119        60
OIR    2025250     91400   19.9600 -113.4000       8.5       165       119        60
OIR    2025250     91400   19.9600 -113.4100       8.5       165       119        60
OIR    2025250     91400   19.9600 -113.4200       8.5       166       119        60
OIR    2025250     91400   19.9600 -113.4300       8.6       166       119        60
OIR    2025250     91400   19.9600 -113.4400       8.6       166       116        60
OIR    2025250     91400   19.9600 -113.4500       8.7       166       115        60
OIR    2025250     91400   19.9600 -113.4600       9.1       167       115        60
OIR    2025250     91400   19.9600 -113.4700       9.5       166       114        60
OIR    2025250     91400   19.9600 -113.4800       9.9       166       114        60
OIR    2025250     91400   19.9600 -113.4900      10.4       165       113        60
OIR    2025250     91400   19.9600 -113.5000      10.8       164       113        60
OIR    2025250     91400   19.9600 -113.5100      11.2       164       114        60
OIR    2025250     91400   19.9600 -113.5200      11.4       163       115        60
OIR    2025250     91400   19.9600 -113.5300      11.7       163       116        60
OIR    2025250     91400   19.9600 -113.5400      12.0       163       116        60
OIR    2025250     91400   19.9600 -113.5500      12.2       162       115        60
OIR    2025250     91400   19.9600 -113.5600      12.5       162       113        60
OIR    2025250     91400   19.9600 -113.5700      12.7       162       111        60
OIR    2025250     91400   19.9600 -113.5800      12.8       162       109        60
OIR    2025250     91400   19.9600 -113.5900      12.9       162       107        60
OIR    2025250     91400   19.9600 -113.6000      12.9       162       108        60
OIR    2025250     91400   19.9600 -113.6100      12.9       162       109        60
OIR    2025250     91400   19.9600 -113.6200      13.0       162       108        60
OIR    2025250     91400   19.9600 -113.6300      13.0       162       107        60
OIR    2025250     91400   19.9600 -113.6400      13.0       162       105        60
OIR    2025250     91400   19.9600 -113.6500      12.9       162       104        60
OIR    2025250     91400   19.9600 -113.6600      12.6       162       104        60
OIR    2025250     91400   19.9600 -113.6700      12.0       162       105        60
OIR    2025250     91400   19.9600 -113.6800      11.2       163       105        60
OIR    2025250     91400   19.9600 -113.6900      10.6       164       105        60
OIR    2025250     91400   19.9600 -113.7000      10.2       166       105        60
OIR    2025250     91400   19.9600 -113.7100      10.0       166       107        60
OIR    2025250     91400   19.9600 -113.7200       9.8       167       109        60
OIR    2025250     91400   19.9600 -113.7300       9.7       168       111        60
OIR    2025250     91400   19.9600 -113.7400       9.6       169       111        60
OIR    2025250     91400   19.9600 -113.7500       9.6       169       112        60
OIR    2025250     91400   19.9600 -113.7600       9.5       170       111        60
OIR    2025250     91400   19.9600 -113.7700       9.4       171       111        60
OIR    2025250     91400   19.9600 -113.7800       9.4       171       109        60
OIR    2025250     91400   19.9600 -113.7900       9.4       171       107        60
OIR    2025250     91400   19.9600 -113.8000       9.4       171       107        60
OIR    2025250     91400   19.9600 -113.8100       9.4       171       108        60
OIR    2025250     91400   19.9600 -113.8200       9.4       171       109        60
OIR    2025250     91400   19.9600 -113.8300       9.4       171       111        60
OIR    2025250     91400   19.9600 -113.8400       9.5       171       112        60
OIR    2025250     91400   19.9600 -113.8500       9.5       171       114        60
OIR    2025250     91400   19.9600 -113.8600       9.5       171       114        60
OIR    2025250     91400   19.9600 -113.8700       9.5       171       115        60
OIR    2025250     91400   19.9600 -113.8800       9.5       171       115        60
OIR    2025250     91400   19.9600 -113.8900       9.5       172       115        60
OIR    2025250     91400   19.9600 -113.9000       9.5       172       116        60
OIR    2025250     91400   19.9600 -113.9100       9.5       172       116        60
OIR    2025250     91400   19.9600 -113.9200       9.5       172       116        60
OIR    2025250     91400   19.9600 -113.9300       9.4       173       116        60
OIR    2025250     91400   19.9600 -113.9400       9.4       173       116        60
OIR    2025250     91400   19.9600 -113.9500       9.4       174       116        60
OIR    2025250     91400   19.9600 -113.9600       9.4       174       116        60
OIR    2025250     91400   19.9600 -113.9700       9.3       175       116        60
OIR    2025250     91400   19.9600 -113.9800       9.3       176       117        60
OIR    2025250     91400   19.9600 -113.9900       9.4       178       117        60
OIR    2025250     91400   19.9600 -114.0000       9.4       179       117        60
OIR    2025250     91400   19.9600 -114.0100       9.4       179       116        60
OIR    2025250     91400   19.9600 -114.0200       9.5       180       116        60
OIR    2025250     91400   19.9600 -114.0300       9.5       180       116        60
OIR    2025250     91400   19.9600 -114.0400       9.6       181       116        60
OIR    2025250     91400   19.9600 -114.0500       9.7       182       116        60
OIR    2025250     91400   19.9600 -114.0600       9.8       183       116        60
OIR    2025250     91400   19.9600 -114.0700       9.9       184       117        60
OIR    2025250     91400   19.9600 -114.0800      10.0       184       117        60
OIR    2025250     91400   19.9600 -114.0900      10.0       185       117        60
OIR    2025250     91400   19.9600 -114.1000      10.0       186       117        60
OIR    2025250     91400   19.9600 -114.1100      10.0       186       117        60
OIR    2025250     91400   19.9600 -114.1200      10.0       187       117        60
OIR    2025250     91400   19.9600 -114.1300      10.0       187       119        60
OIR    2025250     91400   19.9600 -114.1400      10.0       188       119        60
OIR    2025250     91400   19.9600 -114.1500      10.0       188       119        60
OIR    2025250     91400   19.9600 -114.1600      10.0       189       120        60
OIR    2025250     91400   19.9600 -114.1700       9.8       191       121        60
OIR    2025250     91400   19.9600 -114.1800       9.3       197       123        60
OIR    2025250     91400   19.9600 -114.1900       9.2       203       124        60
OIR    2025250     91400   19.9600 -114.2000       9.2       207       126        60
OIR    2025250     91400   19.9600 -114.2100       9.2       210       127        60
OIR    2025250     91400   19.9600 -114.2200       9.3       211       127        60
OIR    2025250     91400   19.9600 -114.2300       9.3       212       127        60
OIR    2025250     91400   19.9600 -114.2400       9.3       212       127        60
OIR    2025250     91400   19.9600 -114.2500       9.3       213       127        60
OIR    2025250     91400   19.9600 -114.2600       9.4       213       128        60
OIR    2025250     91400   19.9600 -114.2700       9.3       213       130        60
OIR    2025250     91400   19.9600 -114.2800       9.3       214       133        60
OIR    2025250     91400   19.9600 -114.2900       9.1       215       134        60
OIR    2025250     91400   19.9600 -114.3000       8.8       216       135        60
OIR    2025250     91400   19.9600 -114.3100       8.8       216       134        60
OIR    2025250     91400   19.9600 -114.3200       8.8       217       133        60
OIR    2025250     91400   19.9600 -114.3300       8.8       217       133        60
OIR    2025250     91400   19.9600 -114.3400       8.8       217       134        60
OIR    2025250     91400   19.9600 -114.3500       8.8       217       135        60
OIR    2025250     91400   19.9600 -114.3600       8.9       217       138        60
OIR    2025250     91400   19.9600 -116.1200      12.5       176       141        60
OIR    2025250     91400   19.9600 -116.1300      12.5       176       140        60
OIR    2025250     91400   19.9600 -116.1400      12.5       177       141        60
OIR    2025250     91400   19.9600 -116.1800      12.7       179       141        60
OIR    2025250     91400   19.9600 -116.1900      12.8       180       140        60
OIR    2025250     91400   19.9600 -116.2000      12.9       182       139        60
OIR    2025250     91400   19.9600 -116.2100      13.0       183       140        60
OIR    2025250     91400   19.9600 -116.2200      13.2       184       142        60
OIR    2025250     91400   19.9500 -112.1600       5.1        65       140        60
OIR    2025250     91400   19.9500 -112.1700       5.0        66       137        60
OIR    2025250     91400   19.9500 -112.1800       4.7        70       137        60
OIR    2025250     91400   19.9500 -112.1900       4.3        75       138        60
OIR    2025250     91400   19.9500 -112.2000       4.1        80       138        60
OIR    2025250     91400   19.9500 -112.2100       4.1        83       138        60
OIR    2025250     91400   19.9500 -112.2200       4.3        86       138        60
OIR    2025250     91400   19.9500 -112.2300       4.8        91       137        60
OIR    2025250     91400   19.9500 -112.2400       5.2        94       137        60
OIR    2025250     91400   19.9500 -112.2500       5.5        94       137        60
OIR    2025250     91400   19.9500 -112.2600       5.7        95       137        60
OIR    2025250     91400   19.9500 -112.2700       6.0        95       138        60
OIR    2025250     91400   19.9500 -112.2800       6.4        96       138        60
OIR    2025250     91400   19.9500 -112.2900       7.0        95       139        60
OIR    2025250     91400   19.9500 -112.3000       7.7        94       139        60
OIR    2025250     91400   19.9500 -112.3100       8.2        92       139        60
OIR    2025250     91400   19.9500 -112.3200       8.4        91       140        60
OIR    2025250     91400   19.9500 -112.3400       8.8        88       140        60
OIR    2025250     91400   19.9500 -112.3500       9.4        85       139        60
OIR    2025250     91400   19.9500 -112.3600       9.5        85       138        60
OIR    2025250     91400   19.9500 -112.3700      11.0        81       140        60
OIR    2025250     91400   19.9500 -112.8400      12.5       119       136        60
OIR    2025250     91400   19.9500 -112.8500      12.3       121       132        60
OIR    2025250     91400   19.9500 -112.8600      12.3       126       132        60
OIR    2025250     91400   19.9500 -112.8700      12.2       128       132        60
OIR    2025250     91400   19.9500 -112.8800      12.0       130       133        60
OIR    2025250     91400   19.9500 -112.8900      11.4       132       133        60
OIR    2025250     91400   19.9500 -112.9000      11.0       133       134        60
OIR    2025250     91400   19.9500 -112.9100      10.8       133       135        60
OIR    2025250     91400   19.9500 -112.9200      10.6       134       135        60
OIR    2025250     91400   19.9500 -112.9300      10.4       135       135        60
OIR    2025250     91400   19.9500 -112.9400      10.3       136       135        60
OIR    2025250     91400   19.9500 -112.9500      10.2       137       135        60
OIR    2025250     91400   19.9500 -112.9600      10.1       137       134        60
OIR    2025250     91400   19.9500 -112.9700      10.0       137       134        60
OIR    2025250     91400   19.9500 -112.9800       9.9       138       134        60
OIR    2025250     91400   19.9500 -112.9900       9.7       138       134        60
OIR    2025250     91400   19.9500 -113.0000       9.6       138       134        60
OIR    2025250     91400   19.9500 -113.0100       9.5       139       135        60
OIR    2025250     91400   19.9500 -113.0200       9.3       140       133        60
OIR    2025250     91400   19.9500 -113.0300       9.3       140       132        60
OIR    2025250     91400   19.9500 -113.0400       9.2       140       131        60
OIR    2025250     91400   19.9500 -113.0500       9.2       141       130        60
OIR    2025250     91400   19.9500 -113.0600       9.1       142       129        60
OIR    2025250     91400   19.9500 -113.0700       9.0       143       128        60
OIR    2025250     91400   19.9500 -113.0800       8.9       145       127        60
OIR    2025250     91400   19.9500 -113.0900       8.6       147       128        60
OIR    2025250     91400   19.9500 -113.1000       8.4       150       129        60
OIR    2025250     91400   19.9500 -113.1100       8.1       153       129        60
OIR    2025250     91400   19.9500 -113.1200       8.0       156       129        60
OIR    2025250     91400   19.9500 -113.1300       7.9       157       129        60
OIR    2025250     91400   19.9500 -113.1400       7.8       159       129        60
OIR    2025250     91400   19.9500 -113.1500       7.8       160       128        60
OIR    2025250     91400   19.9500 -113.1600       7.8       161       128        60
OIR    2025250     91400   19.9500 -113.1700       7.8       161       127        60
OIR    2025250     91400   19.9500 -113.1800       7.9       162       127        60
OIR    2025250     91400   19.9500 -113.1900       7.9       162       125        60
OIR    2025250     91400   19.9500 -113.2000       7.9       163       125        60
OIR    2025250     91400   19.9500 -113.2100       8.0       163       125        60
OIR    2025250     91400   19.9500 -113.2200       8.0       163       124        60
OIR    2025250     91400   19.9500 -113.2300       8.0       164       124        60
OIR    2025250     91400   19.9500 -113.2400       8.1       164       123        60
OIR    2025250     91400   19.9500 -113.2500       8.1       164       123        60
OIR    2025250     91400   19.9500 -113.2600       8.1       164       123        60
OIR    2025250     91400   19.9500 -113.2700       8.2       164       122        60
OIR    2025250     91400   19.9500 -113.2800       8.2       164       120        60
OIR    2025250     91400   19.9500 -113.2900       8.2       164       117        60
OIR    2025250     91400   19.9500 -113.3000       8.2       164       119        60
OIR    2025250     91400   19.9500 -113.3100       8.3       164       120        60
OIR    2025250     91400   19.9500 -113.3200       8.3       164       121        60
OIR    2025250     91400   19.9500 -113.3300       8.3       165       121        60
OIR    2025250     91400   19.9500 -113.3400       8.3       165       121        60
OIR    2025250     91400   19.9500 -113.3500       8.3       165       120        60
OIR    2025250     91400   19.9500 -113.3600       8.3       165       120        60
OIR    2025250     91400   19.9500 -113.3700       8.4       165       119        60
OIR    2025250     91400   19.9500 -113.3800       8.4       165       117        60
OIR    2025250     91400   19.9500 -113.3900       8.4       165       117        60
OIR    2025250     91400   19.9500 -113.4000       8.5       166       117        60
OIR    2025250     91400   19.9500 -113.4100       8.5       166       117        60
OIR    2025250     91400   19.9500 -113.4200       8.5       166       117        60
OIR    2025250     91400   19.9500 -113.4300       8.6       166       116        60
OIR    2025250     91400   19.9500 -113.4400       8.6       166       115        60
OIR    2025250     91400   19.9500 -113.4500       8.7       166       113        60
OIR    2025250     91400   19.9500 -113.4600       8.8       167       112        60
OIR    2025250     91400   19.9500 -113.4700       9.2       167       112        60
OIR    2025250     91400   19.9500 -113.4800       9.6       166       112        60
OIR    2025250     91400   19.9500 -113.4900      10.1       166       112        60
OIR    2025250     91400   19.9500 -113.5000      10.5       165       112        60
OIR    2025250     91400   19.9500 -113.5100      11.0       164       113        60
OIR    2025250     91400   19.9500 -113.5200      11.3       163       113        60
OIR    2025250     91400   19.9500 -113.5300      11.6       163       114        60
OIR    2025250     91400   19.9500 -113.5400      11.9       163       114        60
OIR    2025250     91400   19.9500 -113.5500      12.1       163       114        60
OIR    2025250     91400   19.9500 -113.5600      12.4       162       113        60
OIR    2025250     91400   19.9500 -113.5700      12.6       162       111        60
OIR    2025250     91400   19.9500 -113.5800      12.8       162       108        60
OIR    2025250     91400   19.9500 -113.5900      12.9       162       104        60
OIR    2025250     91400   19.9500 -113.6000      12.9       162       104        60
OIR    2025250     91400   19.9500 -113.6100      12.9       162       104        60
OIR    2025250     91400   19.9500 -113.6200      13.0       162       104        60
OIR    2025250     91400   19.9500 -113.6300      13.0       162       104        60
OIR    2025250     91400   19.9500 -113.6400      12.9       162       104        60
OIR    2025250     91400   19.9500 -113.6500      12.6       162       104        60
OIR    2025250     91400   19.9500 -113.6600      11.9       163       104        60
OIR    2025250     91400   19.9500 -113.6700      11.1       164       105        60
OIR    2025250     91400   19.9500 -113.6800      10.5       165       107        60
OIR    2025250     91400   19.9500 -113.6900      10.1       166       105        60
OIR    2025250     91400   19.9500 -113.7000       9.8       166       105        60
OIR    2025250     91400   19.9500 -113.7100       9.6       167       105        60
OIR    2025250     91400   19.9500 -113.7200       9.6       168       108        60
OIR    2025250     91400   19.9500 -113.7300       9.5       168       110        60
OIR    2025250     91400   19.9500 -113.7400       9.5       169       111        60
OIR    2025250     91400   19.9500 -113.7500       9.5       170       111        60
OIR    2025250     91400   19.9500 -113.7600       9.4       171       111        60
OIR    2025250     91400   19.9500 -113.7700       9.4       171       110        60
OIR    2025250     91400   19.9500 -113.7800       9.4       171       109        60
OIR    2025250     91400   19.9500 -113.7900       9.4       171       108        60
OIR    2025250     91400   19.9500 -113.8000       9.4       171       108        60
OIR    2025250     91400   19.9500 -113.8100       9.4       171       108        60
OIR    2025250     91400   19.9500 -113.8200       9.4       171       108        60
OIR    2025250     91400   19.9500 -113.8300       9.4       171       109        60
OIR    2025250     91400   19.9500 -113.8400       9.4       171       111        60
OIR    2025250     91400   19.9500 -113.8500       9.5       171       113        60
OIR    2025250     91400   19.9500 -113.8600       9.5       172       113        60
OIR    2025250     91400   19.9500 -113.8700       9.5       172       114        60
OIR    2025250     91400   19.9500 -113.8800       9.5       172       115        60
OIR    2025250     91400   19.9500 -113.8900       9.5       172       115        60
OIR    2025250     91400   19.9500 -113.9000       9.5       172       116        60
OIR    2025250     91400   19.9500 -113.9100       9.5       172       116        60
OIR    2025250     91400   19.9500 -113.9200       9.5       173       116        60
OIR    2025250     91400   19.9500 -113.9300       9.5       173       115        60
OIR    2025250     91400   19.9500 -113.9400       9.5       173       115        60
OIR    2025250     91400   19.9500 -113.9500       9.4       174       115        60
OIR    2025250     91400   19.9500 -113.9600       9.4       175       116        60
OIR    2025250     91400   19.9500 -113.9700       9.3       176       116        60
OIR    2025250     91400   19.9500 -113.9800       9.3       176       116        60
OIR    2025250     91400   19.9500 -113.9900       9.3       178       116        60
OIR    2025250     91400   19.9500 -114.0000       9.4       179       116        60
OIR    2025250     91400   19.9500 -114.0100       9.4       179       116        60
OIR    2025250     91400   19.9500 -114.0200       9.5       179       115        60
OIR    2025250     91400   19.9500 -114.0300       9.5       180       114        60
OIR    2025250     91400   19.9500 -114.0400       9.6       181       114        60
OIR    2025250     91400   19.9500 -114.0500       9.7       182       114        60
OIR    2025250     91400   19.9500 -114.0600       9.8       183       115        60
OIR    2025250     91400   19.9500 -114.0700       9.9       184       115        60
OIR    2025250     91400   19.9500 -114.0800       9.9       184       116        60
OIR    2025250     91400   19.9500 -114.0900       9.9       185       116        60
OIR    2025250     91400   19.9500 -114.1000       9.9       186       116        60
OIR    2025250     91400   19.9500 -114.1100      10.0       186       116        60
OIR    2025250     91400   19.9500 -114.1200      10.0       187       116        60
OIR    2025250     91400   19.9500 -114.1300      10.0       187       117        60
OIR    2025250     91400   19.9500 -114.1400      10.0       188       117        60
OIR    2025250     91400   19.9500 -114.1500      10.0       188       119        60
OIR    2025250     91400   19.9500 -114.1600       9.9       189       119        60
OIR    2025250     91400   19.9500 -114.1700       9.7       192       119        60
OIR    2025250     91400   19.9500 -114.1800       9.1       200       121        60
OIR    2025250     91400   19.9500 -114.1900       9.0       206       122        60
OIR    2025250     91400   19.9500 -114.2000       9.1       210       123        60
OIR    2025250     91400   19.9500 -114.2100       9.2       211       125        60
OIR    2025250     91400   19.9500 -114.2200       9.3       212       126        60
OIR    2025250     91400   19.9500 -114.2300       9.3       212       127        60
OIR    2025250     91400   19.9500 -114.2400       9.3       212       127        60
OIR    2025250     91400   19.9500 -114.2500       9.3       213       127        60
OIR    2025250     91400   19.9500 -114.2600       9.3       213       127        60
OIR    2025250     91400   19.9500 -114.2700       9.3       213       128        60
OIR    2025250     91400   19.9500 -114.2800       9.3       214       129        60
OIR    2025250     91400   19.9500 -114.2900       9.1       215       130        60
OIR    2025250     91400   19.9500 -114.3000       8.9       216       131        60
OIR    2025250     91400   19.9500 -114.3100       8.8       217       131        60
OIR    2025250     91400   19.9500 -114.3200       8.8       217       130        60
OIR    2025250     91400   19.9500 -114.3300       8.8       217       130        60
OIR    2025250     91400   19.9500 -114.3400       8.8       217       131        60
OIR    2025250     91400   19.9500 -114.3500       8.8       217       132        60
OIR    2025250     91400   19.9500 -114.3600       8.8       217       133        60
OIR    2025250     91400   19.9500 -114.3700       8.8       218       135        60
OIR    2025250     91400   19.9500 -114.3800       8.9       218       138        60
OIR    2025250     91400   19.9500 -116.1200      12.4       176       142        60
OIR    2025250     91400   19.9500 -116.1300      12.4       176       140        60
OIR    2025250     91400   19.9500 -116.1400      12.4       177       140        60
OIR    2025250     91400   19.9500 -116.1500      12.4       177       141        60
OIR    2025250     91400   19.9500 -116.1600      12.4       177       141        60
OIR    2025250     91400   19.9500 -116.1700      12.4       177       141        60
OIR    2025250     91400   19.9500 -116.1800      12.4       178       140        60
OIR    2025250     91400   19.9500 -116.1900      12.5       178       140        60
OIR    2025250     91400   19.9500 -116.2000      12.5       180       139        60
OIR    2025250     91400   19.9500 -116.2100      12.6       181       141        60
OIR    2025250     91400   19.9400 -112.1700       4.5        77       139        60
OIR    2025250     91400   19.9400 -112.1800       4.4        79       138        60
OIR    2025250     91400   19.9400 -112.1900       4.2        81       138        60
OIR    2025250     91400   19.9400 -112.2000       4.2        84       138        60
OIR    2025250     91400   19.9400 -112.2100       4.3        88       137        60
OIR    2025250     91400   19.9400 -112.2200       4.6        92       137        60
OIR    2025250     91400   19.9400 -112.2300       5.1        95       136        60
OIR    2025250     91400   19.9400 -112.2400       5.4        96       136        60
OIR    2025250     91400   19.9400 -112.2500       5.6        96       137        60
OIR    2025250     91400   19.9400 -112.2600       5.8        96       137        60
OIR    2025250     91400   19.9400 -112.2700       6.1        97       138        60
OIR    2025250     91400   19.9400 -112.2800       6.5        97       138        60
OIR    2025250     91400   19.9400 -112.2900       7.0        96       139        60
OIR    2025250     91400   19.9400 -112.3000       7.7        95       139        60
OIR    2025250     91400   19.9400 -112.3100       8.1        93       139        60
OIR    2025250     91400   19.9400 -112.3200       8.4        92       139        60
OIR    2025250     91400   19.9400 -112.3300       8.6        91       138        60
OIR    2025250     91400   19.9400 -112.3400       8.8        89       138        60
OIR    2025250     91400   19.9400 -112.3500       9.5        86       137        60
OIR    2025250     91400   19.9400 -112.3600       9.5        85       136        60
OIR    2025250     91400   19.9400 -112.3700      10.6        82       138        60
OIR    2025250     91400   19.9400 -112.3800      13.0        76       140        60
OIR    2025250     91400   19.9400 -112.8400      12.0       118       137        60
OIR    2025250     91400   19.9400 -112.8500      12.0       119       133        60
OIR    2025250     91400   19.9400 -112.8600      11.9       121       132        60
OIR    2025250     91400   19.9400 -112.8700      11.8       125       132        60
OIR    2025250     91400   19.9400 -112.8800      11.6       127       132        60
OIR    2025250     91400   19.9400 -112.8900      11.2       130       133        60
OIR    2025250     91400   19.9400 -112.9000      11.0       132       134        60
OIR    2025250     91400   19.9400 -112.9100      10.8       132       134        60
OIR    2025250     91400   19.9400 -112.9200      10.6       133       134        60
OIR    2025250     91400   19.9400 -112.9300      10.4       135       135        60
OIR    2025250     91400   19.9400 -112.9400      10.2       136       135        60
OIR    2025250     91400   19.9400 -112.9500      10.1       136       135        60
OIR    2025250     91400   19.9400 -112.9600      10.0       137       135        60
OIR    2025250     91400   19.9400 -112.9700       9.9       138       134        60
OIR    2025250     91400   19.9400 -112.9800       9.7       138       134        60
OIR    2025250     91400   19.9400 -112.9900       9.6       138       134        60
OIR    2025250     91400   19.9400 -113.0000       9.4       139       134        60
OIR    2025250     91400   19.9400 -113.0100       9.3       139       134        60
OIR    2025250     91400   19.9400 -113.0200       9.2       140       134        60
OIR    2025250     91400   19.9400 -113.0300       9.2       140       132        60
OIR    2025250     91400   19.9400 -113.0400       9.1       141       130        60
OIR    2025250     91400   19.9400 -113.0500       9.1       142       129        60
OIR    2025250     91400   19.9400 -113.0600       8.9       143       129        60
OIR    2025250     91400   19.9400 -113.0700       8.8       145       128        60
OIR    2025250     91400   19.9400 -113.0800       8.6       148       128        60
OIR    2025250     91400   19.9400 -113.0900       8.3       151       128        60
OIR    2025250     91400   19.9400 -113.1000       8.1       154       128        60
OIR    2025250     91400   19.9400 -113.1100       7.9       156       128        60
OIR    2025250     91400   19.9400 -113.1200       7.8       158       128        60
OIR    2025250     91400   19.9400 -113.1300       7.8       160       128        60
OIR    2025250     91400   19.9400 -113.1400       7.8       161       127        60
OIR    2025250     91400   19.9400 -113.1500       7.8       161       126        60
OIR    2025250     91400   19.9400 -113.1600       7.8       162       126        60
OIR    2025250     91400   19.9400 -113.1700       7.8       162       126        60
OIR    2025250     91400   19.9400 -113.1800       7.9       163       125        60
OIR    2025250     91400   19.9400 -113.1900       7.9       163       124        60
OIR    2025250     91400   19.9400 -113.2000       7.9       163       124        60
OIR    2025250     91400   19.9400 -113.2100       8.0       164       124        60
OIR    2025250     91400   19.9400 -113.2200       8.0       164       124        60
OIR    2025250     91400   19.9400 -113.2300       8.0       164       123        60
OIR    2025250     91400   19.9400 -113.2400       8.1       164       121        60
OIR    2025250     91400   19.9400 -113.2500       8.1       164       120        60
OIR    2025250     91400   19.9400 -113.2600       8.1       164       122        60
OIR    2025250     91400   19.9400 -113.2700       8.2       164       123        60
OIR    2025250     91400   19.9400 -113.2800       8.2       165       121        60
OIR    2025250     91400   19.9400 -113.2900       8.2       165       120        60
OIR    2025250     91400   19.9400 -113.3000       8.2       165       119        60
OIR    2025250     91400   19.9400 -113.3100       8.2       165       119        60
OIR    2025250     91400   19.9400 -113.3200       8.3       165       119        60
OIR    2025250     91400   19.9400 -113.3300       8.3       165       119        60
OIR    2025250     91400   19.9400 -113.3400       8.3       165       119        60
OIR    2025250     91400   19.9400 -113.3500       8.3       165       119        60
OIR    2025250     91400   19.9400 -113.3600       8.3       165       120        60
OIR    2025250     91400   19.9400 -113.3700       8.4       165       119        60
OIR    2025250     91400   19.9400 -113.3800       8.4       165       117        60
OIR    2025250     91400   19.9400 -113.3900       8.4       166       116        60
OIR    2025250     91400   19.9400 -113.4000       8.5       166       116        60
OIR    2025250     91400   19.9400 -113.4100       8.5       166       116        60
OIR    2025250     91400   19.9400 -113.4200       8.5       166       116        60
OIR    2025250     91400   19.9400 -113.4300       8.6       166       116        60
OIR    2025250     91400   19.9400 -113.4400       8.6       166       115        60
OIR    2025250     91400   19.9400 -113.4500       8.6       166       113        60
OIR    2025250     91400   19.9400 -113.4600       8.7       167       112        60
OIR    2025250     91400   19.9400 -113.4700       8.8       167       111        60
OIR    2025250     91400   19.9400 -113.4800       9.1       167       111        60
OIR    2025250     91400   19.9400 -113.4900       9.6       166       111        60
OIR    2025250     91400   19.9400 -113.5000      10.1       165       111        60
OIR    2025250     91400   19.9400 -113.5100      10.6       164       111        60
OIR    2025250     91400   19.9400 -113.5200      11.0       163       111        60
OIR    2025250     91400   19.9400 -113.5300      11.4       163       111        60
OIR    2025250     91400   19.9400 -113.5400      11.6       163       111        60
OIR    2025250     91400   19.9400 -113.5500      11.9       163       111        60
OIR    2025250     91400   19.9400 -113.5600      12.3       163       110        60
OIR    2025250     91400   19.9400 -113.5700      12.5       163       109        60
OIR    2025250     91400   19.9400 -113.5800      12.7       162       107        60
OIR    2025250     91400   19.9400 -113.5900      12.8       162       104        60
OIR    2025250     91400   19.9400 -113.6000      12.9       162       103        60
OIR    2025250     91400   19.9400 -113.6100      12.9       162       103        60
OIR    2025250     91400   19.9400 -113.6200      12.8       162       103        60
OIR    2025250     91400   19.9400 -113.6300      12.5       162       103        60
OIR    2025250     91400   19.9400 -113.6400      12.0       162       103        60
OIR    2025250     91400   19.9400 -113.6500      11.1       163       104        60
OIR    2025250     91400   19.9400 -113.6600      10.2       164       104        60
OIR    2025250     91400   19.9400 -113.6700       9.7       165       104        60
OIR    2025250     91400   19.9400 -113.6800       9.4       166       105        60
OIR    2025250     91400   19.9400 -113.6900       9.4       167       105        60
OIR    2025250     91400   19.9400 -113.7000       9.4       167       105        60
OIR    2025250     91400   19.9400 -113.7100       9.4       168       105        60
OIR    2025250     91400   19.9400 -113.7200       9.5       168       107        60
OIR    2025250     91400   19.9400 -113.7300       9.5       169       109        60
OIR    2025250     91400   19.9400 -113.7400       9.4       169       110        60
OIR    2025250     91400   19.9400 -113.7500       9.4       170       111        60
OIR    2025250     91400   19.9400 -113.7600       9.4       171       111        60
OIR    2025250     91400   19.9400 -113.7700       9.3       171       109        60
OIR    2025250     91400   19.9400 -113.7800       9.3       171       108        60
OIR    2025250     91400   19.9400 -113.7900       9.3       171       109        60
OIR    2025250     91400   19.9400 -113.8000       9.3       171       109        60
OIR    2025250     91400   19.9400 -113.8100       9.4       171       109        60
OIR    2025250     91400   19.9400 -113.8200       9.4       171       108        60
OIR    2025250     91400   19.9400 -113.8300       9.4       172       108        60
OIR    2025250     91400   19.9400 -113.8400       9.4       172       110        60
OIR    2025250     91400   19.9400 -113.8500       9.4       172       112        60
OIR    2025250     91400   19.9400 -113.8600       9.4       172       112        60
OIR    2025250     91400   19.9400 -113.8700       9.4       172       112        60
OIR    2025250     91400   19.9400 -113.8800       9.5       172       114        60
OIR    2025250     91400   19.9400 -113.8900       9.5       172       115        60
OIR    2025250     91400   19.9400 -113.9000       9.5       172       116        60
OIR    2025250     91400   19.9400 -113.9100       9.5       173       116        60
OIR    2025250     91400   19.9400 -113.9200       9.5       173       115        60
OIR    2025250     91400   19.9400 -113.9300       9.5       173       114        60
OIR    2025250     91400   19.9400 -113.9400       9.5       174       113        60
OIR    2025250     91400   19.9400 -113.9500       9.5       174       113        60
OIR    2025250     91400   19.9400 -113.9600       9.4       175       114        60
OIR    2025250     91400   19.9400 -113.9700       9.4       176       115        60
OIR    2025250     91400   19.9400 -113.9800       9.3       177       114        60
OIR    2025250     91400   19.9400 -113.9900       9.4       178       114        60
OIR    2025250     91400   19.9400 -114.0000       9.4       178       115        60
OIR    2025250     91400   19.9400 -114.0100       9.4       179       114        60
OIR    2025250     91400   19.9400 -114.0200       9.5       179       113        60
OIR    2025250     91400   19.9400 -114.0300       9.5       180       111        60
OIR    2025250     91400   19.9400 -114.0400       9.6       180       112        60
OIR    2025250     91400   19.9400 -114.0500       9.7       181       112        60
OIR    2025250     91400   19.9400 -114.0600       9.8       183       112        60
OIR    2025250     91400   19.9400 -114.0700       9.8       183       112        60
OIR    2025250     91400   19.9400 -114.0800       9.9       184       113        60
OIR    2025250     91400   19.9400 -114.0900       9.9       185       114        60
OIR    2025250     91400   19.9400 -114.1000       9.9       186       115        60
OIR    2025250     91400   19.9400 -114.1100       9.9       187       116        60
OIR    2025250     91400   19.9400 -114.1200       9.9       187       116        60
OIR    2025250     91400   19.9400 -114.1300       9.9       188       116        60
OIR    2025250     91400   19.9400 -114.1400       9.9       188       116        60
OIR    2025250     91400   19.9400 -114.1500       9.9       189       116        60
OIR    2025250     91400   19.9400 -114.1600       9.9       189       116        60
OIR    2025250     91400   19.9400 -114.1700       9.7       192       117        60
OIR    2025250     91400   19.9400 -114.1800       9.1       203       119        60
OIR    2025250     91400   19.9400 -114.1900       9.1       209       120        60
OIR    2025250     91400   19.9400 -114.2000       9.2       211       122        60
OIR    2025250     91400   19.9400 -114.2100       9.3       211       123        60
OIR    2025250     91400   19.9400 -114.2200       9.3       212       124        60
OIR    2025250     91400   19.9400 -114.2300       9.3       212       125        60
OIR    2025250     91400   19.9400 -114.2400       9.3       212       126        60
OIR    2025250     91400   19.9400 -114.2500       9.3       213       127        60
OIR    2025250     91400   19.9400 -114.2600       9.3       213       128        60
OIR    2025250     91400   19.9400 -114.2700       9.3       214       128        60
OIR    2025250     91400   19.9400 -114.2800       9.2       215       128        60
OIR    2025250     91400   19.9400 -114.2900       9.1       216       129        60
OIR    2025250     91400   19.9400 -114.3000       8.9       216       129        60
OIR    2025250     91400   19.9400 -114.3100       8.8       217       129        60
OIR    2025250     91400   19.9400 -114.3200       8.8       217       128        60
OIR    2025250     91400   19.9400 -114.3300       8.8       217       127        60
OIR    2025250     91400   19.9400 -114.3400       8.8       218       128        60
OIR    2025250     91400   19.9400 -114.3500       8.8       218       129        60
OIR    2025250     91400   19.9400 -114.3600       8.8       218       130        60
OIR    2025250     91400   19.9400 -114.3700       8.8       218       131        60
OIR    2025250     91400   19.9400 -114.3800       8.8       218       132        60
OIR    2025250     91400   19.9400 -114.3900       8.9       218       135        60
OIR    2025250     91400   19.9400 -114.4000       8.9       218       138        60
OIR    2025250     91400   19.9400 -116.0700      12.3       170       142        60
OIR    2025250     91400   19.9400 -116.1200      12.3       176       142        60
OIR    2025250     91400   19.9400 -116.1300      12.3       176       140        60
OIR    2025250     91400   19.9400 -116.1400      12.3       176       139        60
OIR    2025250     91400   19.9400 -116.1500      12.3       176       139        60
OIR    2025250     91400   19.9400 -116.1600      12.3       177       140        60
OIR    2025250     91400   19.9400 -116.1700      12.3       177       141        60
OIR    2025250     91400   19.9400 -116.1800      12.3       177       141        60
OIR    2025250     91400   19.9400 -116.1900      12.3       177       141        60
OIR    2025250     91400   19.9400 -116.2000      12.3       178       141        60
OIR    2025250     91400   19.9400 -116.2100      12.4       179       141        60
OIR    2025250     91400   19.9400 -116.2200      12.3       180       142        60
OIR    2025250     91400   19.9300 -112.1800       4.2        85       139        60
OIR    2025250     91400   19.9300 -112.1900       4.2        87       139        60
OIR    2025250     91400   19.9300 -112.2000       4.3        89       138        60
OIR    2025250     91400   19.9300 -112.2100       4.5        92       137        60
OIR    2025250     91400   19.9300 -112.2200       4.9        95       136        60
OIR    2025250     91400   19.9300 -112.2300       5.2        96       136        60
OIR    2025250     91400   19.9300 -112.2400       5.5        97       136        60
OIR    2025250     91400   19.9300 -112.2500       5.7        97       136        60
OIR    2025250     91400   19.9300 -112.2600       5.9        98       138        60
OIR    2025250     91400   19.9300 -112.2700       6.2        98       138        60
OIR    2025250     91400   19.9300 -112.2800       6.6        99       139        60
OIR    2025250     91400   19.9300 -112.2900       7.2        99       139        60
OIR    2025250     91400   19.9300 -112.3000       7.7        98       139        60
OIR    2025250     91400   19.9300 -112.3100       8.0        97       139        60
OIR    2025250     91400   19.9300 -112.3200       8.4        94       139        60
OIR    2025250     91400   19.9300 -112.3300       8.6        92       137        60
OIR    2025250     91400   19.9300 -112.3400       8.9        90       135        60
OIR    2025250     91400   19.9300 -112.3500       9.4        88       135        60
OIR    2025250     91400   19.9300 -112.3600       9.4        86       135        60
OIR    2025250     91400   19.9300 -112.3700       9.9        81       136        60
OIR    2025250     91400   19.9300 -112.3800      10.6        74       139        60
OIR    2025250     91400   19.9300 -112.8400      11.9       119       138        60
OIR    2025250     91400   19.9300 -112.8500      11.9       119       134        60
OIR    2025250     91400   19.9300 -112.8600      11.9       122       133        60
OIR    2025250     91400   19.9300 -112.8700      11.7       124       132        60
OIR    2025250     91400   19.9300 -112.8800      11.5       126       132        60
OIR    2025250     91400   19.9300 -112.8900      11.2       128       133        60
OIR    2025250     91400   19.9300 -112.9000      11.0       131       134        60
OIR    2025250     91400   19.9300 -112.9100      10.8       132       133        60
OIR    2025250     91400   19.9300 -112.9200      10.5       133       133        60
OIR    2025250     91400   19.9300 -112.9300      10.3       134       133        60
OIR    2025250     91400   19.9300 -112.9400      10.2       135       134        60
OIR    2025250     91400   19.9300 -112.9500      10.0       136       134        60
OIR    2025250     91400   19.9300 -112.9600       9.9       137       135        60
OIR    2025250     91400   19.9300 -112.9700       9.8       138       135        60
OIR    2025250     91400   19.9300 -112.9800       9.6       139       134        60
OIR    2025250     91400   19.9300 -112.9900       9.5       139       134        60
OIR    2025250     91400   19.9300 -113.0000       9.3       140       133        60
OIR    2025250     91400   19.9300 -113.0100       9.2       140       133        60
OIR    2025250     91400   19.9300 -113.0200       9.1       141       133        60
OIR    2025250     91400   19.9300 -113.0300       9.0       141       131        60
OIR    2025250     91400   19.9300 -113.0400       9.0       142       130        60
OIR    2025250     91400   19.9300 -113.0500       8.9       143       129        60
OIR    2025250     91400   19.9300 -113.0600       8.7       145       128        60
OIR    2025250     91400   19.9300 -113.0700       8.5       148       128        60
OIR    2025250     91400   19.9300 -113.0800       8.3       152       129        60
OIR    2025250     91400   19.9300 -113.0900       8.1       154       129        60
OIR    2025250     91400   19.9300 -113.1000       7.9       157       128        60
OIR    2025250     91400   19.9300 -113.1100       7.8       159       128        60
OIR    2025250     91400   19.9300 -113.1200       7.8       160       128        60
OIR    2025250     91400   19.9300 -113.1300       7.7       161       127        60
OIR    2025250     91400   19.9300 -113.1400       7.7       162       126        60
OIR    2025250     91400   19.9300 -113.1500       7.8       162       125        60
OIR    2025250     91400   19.9300 -113.1600       7.8       163       125        60
OIR    2025250     91400   19.9300 -113.1700       7.8       163       125        60
OIR    2025250     91400   19.9300 -113.1800       7.9       163       125        60
OIR    2025250     91400   19.9300 -113.1900       7.9       164       125        60
OIR    2025250     91400   19.9300 -113.2000       7.9       164       124        60
OIR    2025250     91400   19.9300 -113.2100       8.0       164       123        60
OIR    2025250     91400   19.9300 -113.2200       8.0       164       122        60
OIR    2025250     91400   19.9300 -113.2300       8.0       164       121        60
OIR    2025250     91400   19.9300 -113.2400       8.1       164       120        60
OIR    2025250     91400   19.9300 -113.2500       8.1       165       120        60
OIR    2025250     91400   19.9300 -113.2600       8.1       165       120        60
OIR    2025250     91400   19.9300 -113.2700       8.1       165       121        60
OIR    2025250     91400   19.9300 -113.2800       8.2       165       121        60
OIR    2025250     91400   19.9300 -113.2900       8.2       165       119        60
OIR    2025250     91400   19.9300 -113.3000       8.2       165       117        60
OIR    2025250     91400   19.9300 -113.3100       8.2       165       117        60
OIR    2025250     91400   19.9300 -113.3200       8.2       165       117        60
OIR    2025250     91400   19.9300 -113.3300       8.3       165       117        60
OIR    2025250     91400   19.9300 -113.3400       8.3       165       117        60
OIR    2025250     91400   19.9300 -113.3500       8.3       165       119        60
OIR    2025250     91400   19.9300 -113.3600       8.3       165       119        60
OIR    2025250     91400   19.9300 -113.3700       8.4       165       119        60
OIR    2025250     91400   19.9300 -113.3800       8.4       166       117        60
OIR    2025250     91400   19.9300 -113.3900       8.4       166       117        60
OIR    2025250     91400   19.9300 -113.4000       8.4       166       116        60
OIR    2025250     91400   19.9300 -113.4100       8.5       166       114        60
OIR    2025250     91400   19.9300 -113.4200       8.5       166       115        60
OIR    2025250     91400   19.9300 -113.4300       8.5       166       116        60
OIR    2025250     91400   19.9300 -113.4400       8.6       166       115        60
OIR    2025250     91400   19.9300 -113.4500       8.6       167       114        60
OIR    2025250     91400   19.9300 -113.4600       8.6       167       112        60
OIR    2025250     91400   19.9300 -113.4700       8.6       167       111        60
OIR    2025250     91400   19.9300 -113.4800       8.8       167       110        60
OIR    2025250     91400   19.9300 -113.4900       9.1       167       109        60
OIR    2025250     91400   19.9300 -113.5000       9.5       166       109        60
OIR    2025250     91400   19.9300 -113.5100      10.1       165       109        60
OIR    2025250     91400   19.9300 -113.5200      10.5       164       109        60
OIR    2025250     91400   19.9300 -113.5300      10.9       164       108        60
OIR    2025250     91400   19.9300 -113.5400      11.3       164       108        60
OIR    2025250     91400   19.9300 -113.5500      11.7       163       107        60
OIR    2025250     91400   19.9300 -113.5600      11.9       163       105        60
OIR    2025250     91400   19.9300 -113.5700      12.2       163       104        60
OIR    2025250     91400   19.9300 -113.5800      12.5       162       104        60
OIR    2025250     91400   19.9300 -113.5900      12.7       162       104        60
OIR    2025250     91400   19.9300 -113.6000      12.8       162       103        60
OIR    2025250     91400   19.9300 -113.6100      12.4       162       103        60
OIR    2025250     91400   19.9300 -113.6200      11.2       163       103        60
OIR    2025250     91400   19.9300 -113.6300      10.5       164       103        60
OIR    2025250     91400   19.9300 -113.6400      10.0       164       103        60
OIR    2025250     91400   19.9300 -113.6500       9.6       165       103        60
OIR    2025250     91400   19.9300 -113.6600       9.3       166       104        60
OIR    2025250     91400   19.9300 -113.6700       9.3       166       104        60
OIR    2025250     91400   19.9300 -113.6800       9.3       167       104        60
OIR    2025250     91400   19.9300 -113.6900       9.3       167       105        60
OIR    2025250     91400   19.9300 -113.7000       9.3       167       105        60
OIR    2025250     91400   19.9300 -113.7100       9.4       168       105        60
OIR    2025250     91400   19.9300 -113.7200       9.4       168       107        60
OIR    2025250     91400   19.9300 -113.7300       9.4       169       108        60
OIR    2025250     91400   19.9300 -113.7400       9.4       170       109        60
OIR    2025250     91400   19.9300 -113.7500       9.3       171       110        60
OIR    2025250     91400   19.9300 -113.7600       9.3       171       110        60
OIR    2025250     91400   19.9300 -113.7700       9.3       171       109        60
OIR    2025250     91400   19.9300 -113.7800       9.3       171       108        60
OIR    2025250     91400   19.9300 -113.7900       9.3       171       108        60
OIR    2025250     91400   19.9300 -113.8000       9.3       171       109        60
OIR    2025250     91400   19.9300 -113.8100       9.3       172       109        60
OIR    2025250     91400   19.9300 -113.8200       9.3       172       108        60
OIR    2025250     91400   19.9300 -113.8300       9.4       172       108        60
OIR    2025250     91400   19.9300 -113.8400       9.4       172       109        60
OIR    2025250     91400   19.9300 -113.8500       9.4       172       109        60
OIR    2025250     91400   19.9300 -113.8600       9.4       172       110        60
OIR    2025250     91400   19.9300 -113.8700       9.4       172       110        60
OIR    2025250     91400   19.9300 -113.8800       9.5       172       112        60
OIR    2025250     91400   19.9300 -113.8900       9.5       172       114        60
OIR    2025250     91400   19.9300 -113.9000       9.5       173       115        60
OIR    2025250     91400   19.9300 -113.9100       9.6       173       115        60
OIR    2025250     91400   19.9300 -113.9200       9.6       173       114        60
OIR    2025250     91400   19.9300 -113.9300       9.6       174       113        60
OIR    2025250     91400   19.9300 -113.9400       9.5       174       111        60
OIR    2025250     91400   19.9300 -113.9500       9.5       175       111        60
OIR    2025250     91400   19.9300 -113.9600       9.4       175       112        60
OIR    2025250     91400   19.9300 -113.9700       9.4       176       112        60
OIR    2025250     91400   19.9300 -113.9800       9.4       177       112        60
OIR    2025250     91400   19.9300 -113.9900       9.4       178       112        60
OIR    2025250     91400   19.9300 -114.0000       9.4       178       113        60
OIR    2025250     91400   19.9300 -114.0100       9.5       179       113        60
OIR    2025250     91400   19.9300 -114.0200       9.5       179       111        60
OIR    2025250     91400   19.9300 -114.0300       9.5       180       109        60
OIR    2025250     91400   19.9300 -114.0400       9.6       180       109        60
OIR    2025250     91400   19.9300 -114.0500       9.7       181       110        60
OIR    2025250     91400   19.9300 -114.0600       9.8       182       110        60
OIR    2025250     91400   19.9300 -114.0700       9.8       183       110        60
OIR    2025250     91400   19.9300 -114.0800       9.8       184       110        60
OIR    2025250     91400   19.9300 -114.0900       9.9       185       111        60
OIR    2025250     91400   19.9300 -114.1000       9.9       186       113        60
OIR    2025250     91400   19.9300 -114.1100       9.9       187       114        60
OIR    2025250     91400   19.9300 -114.1200       9.9       187       115        60
OIR    2025250     91400   19.9300 -114.1300       9.9       188       115        60
OIR    2025250     91400   19.9300 -114.1400       9.9       188       116        60
OIR    2025250     91400   19.9300 -114.1500       9.8       189       116        60
OIR    2025250     91400   19.9300 -114.1600       9.8       190       116        60
OIR    2025250     91400   19.9300 -114.1700       9.6       192       116        60
OIR    2025250     91400   19.9300 -114.1800       9.2       204       116        60
OIR    2025250     91400   19.9300 -114.1900       9.2       210       117        60
OIR    2025250     91400   19.9300 -114.2000       9.3       211       120        60
OIR    2025250     91400   19.9300 -114.2100       9.3       212       121        60
OIR    2025250     91400   19.9300 -114.2200       9.3       212       123        60
OIR    2025250     91400   19.9300 -114.2300       9.2       212       124        60
OIR    2025250     91400   19.9300 -114.2400       9.2       213       125        60
OIR    2025250     91400   19.9300 -114.2500       9.2       213       127        60
OIR    2025250     91400   19.9300 -114.2600       9.2       214       128        60
OIR    2025250     91400   19.9300 -114.2700       9.2       214       128        60
OIR    2025250     91400   19.9300 -114.2800       9.2       215       128        60
OIR    2025250     91400   19.9300 -114.2900       9.1       216       128        60
OIR    2025250     91400   19.9300 -114.3000       8.9       217       128        60
OIR    2025250     91400   19.9300 -114.3100       8.8       217       128        60
OIR    2025250     91400   19.9300 -114.3200       8.8       217       127        60
OIR    2025250     91400   19.9300 -114.3300       8.8       218       126        60
OIR    2025250     91400   19.9300 -114.3400       8.8       218       126        60
OIR    2025250     91400   19.9300 -114.3500       8.8       218       127        60
OIR    2025250     91400   19.9300 -114.3600       8.8       218       128        60
OIR    2025250     91400   19.9300 -114.3700       8.8       218       128        60
OIR    2025250     91400   19.9300 -114.3800       8.8       218       130        60
OIR    2025250     91400   19.9300 -114.3900       8.8       218       132        60
OIR    2025250     91400   19.9300 -114.4000       8.8       218       134        60
OIR    2025250     91400   19.9300 -114.4100       8.8       218       137        60
OIR    2025250     91400   19.9300 -116.0000      11.7       157       142        60
OIR    2025250     91400   19.9300 -116.0100      11.7       157       141        60
OIR    2025250     91400   19.9300 -116.0500      12.1       166       142        60
OIR    2025250     91400   19.9300 -116.0600      12.2       169       141        60
OIR    2025250     91400   19.9300 -116.0700      12.2       170       141        60
OIR    2025250     91400   19.9300 -116.0800      12.1       171       141        60
OIR    2025250     91400   19.9300 -116.0900      12.1       172       142        60
OIR    2025250     91400   19.9300 -116.1000      12.1       173       142        60
OIR    2025250     91400   19.9300 -116.1100      12.2       175       142        60
OIR    2025250     91400   19.9300 -116.1200      12.3       176       142        60
OIR    2025250     91400   19.9300 -116.1300      12.3       176       140        60
OIR    2025250     91400   19.9300 -116.1400      12.3       176       139        60
OIR    2025250     91400   19.9300 -116.1500      12.3       176       138        60
OIR    2025250     91400   19.9300 -116.1600      12.3       177       138        60
OIR    2025250     91400   19.9300 -116.1700      12.3       177       139        60
OIR    2025250     91400   19.9300 -116.1800      12.3       177       141        60
OIR    2025250     91400   19.9300 -116.2200      12.2       179       142        60
OIR    2025250     91400   19.9300 -116.2300      12.0       180       141        60
OIR    2025250     91400   19.9200 -112.1900       4.2        92       139        60
OIR    2025250     91400   19.9200 -112.2000       4.4        94       138        60
OIR    2025250     91400   19.9200 -112.2100       4.7        96       137        60
OIR    2025250     91400   19.9200 -112.2200       5.0        98       137        60
OIR    2025250     91400   19.9200 -112.2300       5.3        99       136        60
OIR    2025250     91400   19.9200 -112.2400       5.5        99       136        60
OIR    2025250     91400   19.9200 -112.2500       5.8        99       137        60
OIR    2025250     91400   19.9200 -112.2600       6.1       100       138        60
OIR    2025250     91400   19.9200 -112.2700       6.5       102       139        60
OIR    2025250     91400   19.9200 -112.2800       6.9       103       139        60
OIR    2025250     91400   19.9200 -112.2900       7.3       103       138        60
OIR    2025250     91400   19.9200 -112.3000       7.6       103       138        60
OIR    2025250     91400   19.9200 -112.3100       7.9       101       139        60
OIR    2025250     91400   19.9200 -112.3200       8.1        98       139        60
OIR    2025250     91400   19.9200 -112.3300       8.4        95       137        60
OIR    2025250     91400   19.9200 -112.3400       8.8        93       135        60
OIR    2025250     91400   19.9200 -112.3500       9.3        90       134        60
OIR    2025250     91400   19.9200 -112.3600       9.4        88       134        60
OIR    2025250     91400   19.9200 -112.3700       9.6        81       135        60
OIR    2025250     91400   19.9200 -112.3800       9.9        74       139        60
OIR    2025250     91400   19.9200 -112.8300      11.5       120       137        60
OIR    2025250     91400   19.9200 -112.8400      11.8       119       135        60
OIR    2025250     91400   19.9200 -112.8500      11.9       121       134        60
OIR    2025250     91400   19.9200 -112.8600      11.8       123       133        60
OIR    2025250     91400   19.9200 -112.8700      11.6       125       132        60
OIR    2025250     91400   19.9200 -112.8800      11.5       126       132        60
OIR    2025250     91400   19.9200 -112.8900      11.2       128       133        60
OIR    2025250     91400   19.9200 -112.9000      11.0       130       133        60
OIR    2025250     91400   19.9200 -112.9100      10.7       131       133        60
OIR    2025250     91400   19.9200 -112.9200      10.5       133       133        60
OIR    2025250     91400   19.9200 -112.9300      10.3       134       133        60
OIR    2025250     91400   19.9200 -112.9400      10.1       135       134        60
OIR    2025250     91400   19.9200 -112.9500       9.9       136       134        60
OIR    2025250     91400   19.9200 -112.9600       9.8       137       134        60
OIR    2025250     91400   19.9200 -112.9700       9.7       138       135        60
OIR    2025250     91400   19.9200 -112.9800       9.5       139       134        60
OIR    2025250     91400   19.9200 -112.9900       9.4       140       134        60
OIR    2025250     91400   19.9200 -113.0000       9.2       140       133        60
OIR    2025250     91400   19.9200 -113.0100       9.1       141       132        60
OIR    2025250     91400   19.9200 -113.0200       9.0       142       131        60
OIR    2025250     91400   19.9200 -113.0300       8.9       143       131        60
OIR    2025250     91400   19.9200 -113.0400       8.8       144       130        60
OIR    2025250     91400   19.9200 -113.0500       8.7       146       129        60
OIR    2025250     91400   19.9200 -113.0600       8.5       149       128        60
OIR    2025250     91400   19.9200 -113.0700       8.3       152       128        60
OIR    2025250     91400   19.9200 -113.0800       8.1       155       128        60
OIR    2025250     91400   19.9200 -113.0900       8.0       158       129        60
OIR    2025250     91400   19.9200 -113.1000       7.9       159       128        60
OIR    2025250     91400   19.9200 -113.1100       7.8       161       128        60
OIR    2025250     91400   19.9200 -113.1200       7.8       162       127        60
OIR    2025250     91400   19.9200 -113.1300       7.7       162       127        60
OIR    2025250     91400   19.9200 -113.1400       7.8       163       126        60
OIR    2025250     91400   19.9200 -113.1500       7.8       163       124        60
OIR    2025250     91400   19.9200 -113.1600       7.8       164       123        60
OIR    2025250     91400   19.9200 -113.1700       7.8       164       124        60
OIR    2025250     91400   19.9200 -113.1800       7.9       164       125        60
OIR    2025250     91400   19.9200 -113.1900       7.9       164       125        60
OIR    2025250     91400   19.9200 -113.2000       7.9       164       124        60
OIR    2025250     91400   19.9200 -113.2100       8.0       164       123        60
OIR    2025250     91400   19.9200 -113.2200       8.0       165       121        60
OIR    2025250     91400   19.9200 -113.2300       8.0       165       119        60
OIR    2025250     91400   19.9200 -113.2400       8.0       165       120        60
OIR    2025250     91400   19.9200 -113.2500       8.1       165       120        60
OIR    2025250     91400   19.9200 -113.2600       8.1       165       120        60
OIR    2025250     91400   19.9200 -113.2700       8.1       165       120        60
OIR    2025250     91400   19.9200 -113.2800       8.2       165       120        60
OIR    2025250     91400   19.9200 -113.2900       8.2       165       117        60
OIR    2025250     91400   19.9200 -113.3000       8.2       165       116        60
OIR    2025250     91400   19.9200 -113.3100       8.2       165       116        60
OIR    2025250     91400   19.9200 -113.3200       8.2       165       117        60
OIR    2025250     91400   19.9200 -113.3300       8.3       165       117        60
OIR    2025250     91400   19.9200 -113.3400       8.3       165       117        60
OIR    2025250     91400   19.9200 -113.3500       8.3       165       117        60
OIR    2025250     91400   19.9200 -113.3600       8.3       166       117        60
OIR    2025250     91400   19.9200 -113.3700       8.4       166       117        60
OIR    2025250     91400   19.9200 -113.3800       8.4       166       117        60
OIR    2025250     91400   19.9200 -113.3900       8.4       166       116        60
OIR    2025250     91400   19.9200 -113.4000       8.4       166       116        60
OIR    2025250     91400   19.9200 -113.4100       8.5       166       115        60
OIR    2025250     91400   19.9200 -113.4200       8.5       166       115        60
OIR    2025250     91400   19.9200 -113.4300       8.5       166       115        60
OIR    2025250     91400   19.9200 -113.4400       8.5       167       114        60
OIR    2025250     91400   19.9200 -113.4500       8.6       167       113        60
OIR    2025250     91400   19.9200 -113.4600       8.6       167       112        60
OIR    2025250     91400   19.9200 -113.4700       8.6       167       111        60
OIR    2025250     91400   19.9200 -113.4800       8.6       167       110        60
OIR    2025250     91400   19.9200 -113.4900       8.7       167       109        60
OIR    2025250     91400   19.9200 -113.5000       8.9       166       109        60
OIR    2025250     91400   19.9200 -113.5100       9.3       165       109        60
OIR    2025250     91400   19.9200 -113.5200       9.7       165       109        60
OIR    2025250     91400   19.9200 -113.5300      10.1       164       108        60
OIR    2025250     91400   19.9200 -113.5400      10.7       164       105        60
OIR    2025250     91400   19.9200 -113.5500      11.1       164       104        60
OIR    2025250     91400   19.9200 -113.5600      11.4       164       104        60
OIR    2025250     91400   19.9200 -113.5700      11.8       163       104        60
OIR    2025250     91400   19.9200 -113.5800      12.0       163       104        60
OIR    2025250     91400   19.9200 -113.5900      12.0       163       103        60
OIR    2025250     91400   19.9200 -113.6000      11.4       163       103        60
OIR    2025250     91400   19.9200 -113.6100      10.4       163       103        60
OIR    2025250     91400   19.9200 -113.6200       9.7       164       103        60
OIR    2025250     91400   19.9200 -113.6300       9.3       165       103        60
OIR    2025250     91400   19.9200 -113.6400       9.2       165       103        60
OIR    2025250     91400   19.9200 -113.6500       9.1       166       103        60
OIR    2025250     91400   19.9200 -113.6600       9.2       166       104        60
OIR    2025250     91400   19.9200 -113.6700       9.2       167       104        60
OIR    2025250     91400   19.9200 -113.6800       9.2       167       104        60
OIR    2025250     91400   19.9200 -113.6900       9.2       167       105        60
OIR    2025250     91400   19.9200 -113.7000       9.3       167       105        60
OIR    2025250     91400   19.9200 -113.7100       9.3       168       105        60
OIR    2025250     91400   19.9200 -113.7200       9.3       168       107        60
OIR    2025250     91400   19.9200 -113.7300       9.3       169       108        60
OIR    2025250     91400   19.9200 -113.7400       9.3       170       108        60
OIR    2025250     91400   19.9200 -113.7500       9.3       171       109        60
OIR    2025250     91400   19.9200 -113.7600       9.3       171       109        60
OIR    2025250     91400   19.9200 -113.7700       9.3       171       108        60
OIR    2025250     91400   19.9200 -113.7800       9.3       171       108        60
OIR    2025250     91400   19.9200 -113.7900       9.3       172       108        60
OIR    2025250     91400   19.9200 -113.8000       9.3       172       108        60
OIR    2025250     91400   19.9200 -113.8100       9.3       172       108        60
OIR    2025250     91400   19.9200 -113.8200       9.3       172       108        60
OIR    2025250     91400   19.9200 -113.8300       9.3       172       108        60
OIR    2025250     91400   19.9200 -113.8400       9.3       172       108        60
OIR    2025250     91400   19.9200 -113.8500       9.4       172       107        60
OIR    2025250     91400   19.9200 -113.8600       9.4       172       107        60
OIR    2025250     91400   19.9200 -113.8700       9.4       172       108        60
OIR    2025250     91400   19.9200 -113.8800       9.5       172       109        60
OIR    2025250     91400   19.9200 -113.8900       9.5       173       113        60
OIR    2025250     91400   19.9200 -113.9000       9.6       173       115        60
OIR    2025250     91400   19.9200 -113.9100       9.6       173       114        60
OIR    2025250     91400   19.9200 -113.9200       9.6       174       113        60
OIR    2025250     91400   19.9200 -113.9300       9.6       174       111        60
OIR    2025250     91400   19.9200 -113.9400       9.6       175       109        60
OIR    2025250     91400   19.9200 -113.9500       9.5       175       108        60
OIR    2025250     91400   19.9200 -113.9600       9.5       176       108        60
OIR    2025250     91400   19.9200 -113.9700       9.4       176       108        60
OIR    2025250     91400   19.9200 -113.9800       9.4       177       109        60
OIR    2025250     91400   19.9200 -113.9900       9.4       178       110        60
OIR    2025250     91400   19.9200 -114.0000       9.4       178       110        60
OIR    2025250     91400   19.9200 -114.0100       9.5       179       111        60
OIR    2025250     91400   19.9200 -114.0200       9.5       179       110        60
OIR    2025250     91400   19.9200 -114.0300       9.5       179       109        60
OIR    2025250     91400   19.9200 -114.0400       9.6       180       108        60
OIR    2025250     91400   19.9200 -114.0500       9.6       180       109        60
OIR    2025250     91400   19.9200 -114.0600       9.7       182       109        60
OIR    2025250     91400   19.9200 -114.0700       9.7       183       109        60
OIR    2025250     91400   19.9200 -114.0800       9.8       184       108        60
OIR    2025250     91400   19.9200 -114.0900       9.8       185       110        60
OIR    2025250     91400   19.9200 -114.1000       9.8       186       112        60
OIR    2025250     91400   19.9200 -114.1100       9.8       187       113        60
OIR    2025250     91400   19.9200 -114.1200       9.8       187       114        60
OIR    2025250     91400   19.9200 -114.1300       9.8       188       114        60
OIR    2025250     91400   19.9200 -114.1400       9.8       188       114        60
OIR    2025250     91400   19.9200 -114.1500       9.8       189       114        60
OIR    2025250     91400   19.9200 -114.1600       9.8       190       114        60
OIR    2025250     91400   19.9200 -114.1700       9.6       192       114        60
OIR    2025250     91400   19.9200 -114.1800       9.3       205       115        60
OIR    2025250     91400   19.9200 -114.1900       9.3       210       116        60
OIR    2025250     91400   19.9200 -114.2000       9.3       211       119        60
OIR    2025250     91400   19.9200 -114.2100       9.3       212       120        60
OIR    2025250     91400   19.9200 -114.2200       9.3       212       121        60
OIR    2025250     91400   19.9200 -114.2300       9.2       212       123        60
OIR    2025250     91400   19.9200 -114.2400       9.2       213       124        60
OIR    2025250     91400   19.9200 -114.2500       9.2       213       126        60
OIR    2025250     91400   19.9200 -114.2600       9.1       214       127        60
OIR    2025250     91400   19.9200 -114.2700       9.1       214       127        60
OIR    2025250     91400   19.9200 -114.2800       9.1       215       127        60
OIR    2025250     91400   19.9200 -114.2900       9.0       216       127        60
OIR    2025250     91400   19.9200 -114.3000       8.9       217       127        60
OIR    2025250     91400   19.9200 -114.3100       8.8       217       127        60
OIR    2025250     91400   19.9200 -114.3200       8.8       218       126        60
OIR    2025250     91400   19.9200 -114.3300       8.8       218       125        60
OIR    2025250     91400   19.9200 -114.3400       8.8       218       125        60
OIR    2025250     91400   19.9200 -114.3500       8.8       218       125        60
OIR    2025250     91400   19.9200 -114.3600       8.8       218       126        60
OIR    2025250     91400   19.9200 -114.3700       8.8       218       126        60
OIR    2025250     91400   19.9200 -114.3800       8.8       218       127        60
OIR    2025250     91400   19.9200 -114.3900       8.8       218       129        60
OIR    2025250     91400   19.9200 -114.4000       8.8       218       130        60
OIR    2025250     91400   19.9200 -114.4100       8.8       218       133        60
OIR    2025250     91400   19.9200 -114.4200       8.8       218       135        60
OIR    2025250     91400   19.9200 -114.4300       8.8       218       138        60
OIR    2025250     91400   19.9200 -116.0000      11.7       157       142        60
OIR    2025250     91400   19.9200 -116.0100      11.7       157       141        60
OIR    2025250     91400   19.9200 -116.0200      11.7       157       140        60
OIR    2025250     91400   19.9200 -116.0300      11.7       158       140        60
OIR    2025250     91400   19.9200 -116.0700      12.1       170       142        60
OIR    2025250     91400   19.9200 -116.0800      12.1       171       141        60
OIR    2025250     91400   19.9200 -116.0900      12.1       172       140        60
OIR    2025250     91400   19.9200 -116.1000      12.1       173       140        60
OIR    2025250     91400   19.9200 -116.1100      12.2       175       141        60
OIR    2025250     91400   19.9200 -116.1300      12.3       176       141        60
OIR    2025250     91400   19.9200 -116.1400      12.3       176       140        60
OIR    2025250     91400   19.9200 -116.1500      12.3       176       139        60
OIR    2025250     91400   19.9200 -116.1600      12.3       176       137        60
OIR    2025250     91400   19.9200 -116.1700      12.3       176       138        60
OIR    2025250     91400   19.9200 -116.1800      12.3       177       140        60
OIR    2025250     91400   19.9200 -116.1900      12.3       177       141        60
OIR    2025250     91400   19.9200 -116.2300      12.0       180       142        60
OIR    2025250     91400   19.9100 -112.2000       4.5        98       139        60
OIR    2025250     91400   19.9100 -112.2100       4.9       100       138        60
OIR    2025250     91400   19.9100 -112.2200       5.2       102       137        60
OIR    2025250     91400   19.9100 -112.2300       5.5       102       136        60
OIR    2025250     91400   19.9100 -112.2400       5.8       103       137        60
OIR    2025250     91400   19.9100 -112.2500       6.1       104       137        60
OIR    2025250     91400   19.9100 -112.2600       6.5       105       138        60
OIR    2025250     91400   19.9100 -112.2700       6.8       106       139        60
OIR    2025250     91400   19.9100 -112.2800       7.2       107       138        60
OIR    2025250     91400   19.9100 -112.2900       7.4       107       138        60
OIR    2025250     91400   19.9100 -112.3000       7.6       106       137        60
OIR    2025250     91400   19.9100 -112.3100       7.7       105       138        60
OIR    2025250     91400   19.9100 -112.3200       7.9       103       138        60
OIR    2025250     91400   19.9100 -112.3300       8.2       100       137        60
OIR    2025250     91400   19.9100 -112.3400       8.6        98       136        60
OIR    2025250     91400   19.9100 -112.3500       9.2        94       135        60
OIR    2025250     91400   19.9100 -112.3600       9.3        91       134        60
OIR    2025250     91400   19.9100 -112.3700       9.1        88       135        60
OIR    2025250     91400   19.9100 -112.3800       9.4        72       139        60
OIR    2025250     91400   19.9100 -112.8100      10.9       124       139        60
OIR    2025250     91400   19.9100 -112.8200      11.1       124       136        60
OIR    2025250     91400   19.9100 -112.8300      11.5       124       133        60
OIR    2025250     91400   19.9100 -112.8400      11.7       123       133        60
OIR    2025250     91400   19.9100 -112.8500      11.7       124       133        60
OIR    2025250     91400   19.9100 -112.8600      11.7       125       133        60
OIR    2025250     91400   19.9100 -112.8700      11.5       126       133        60
OIR    2025250     91400   19.9100 -112.8800      11.4       127       133        60
OIR    2025250     91400   19.9100 -112.8900      11.2       128       133        60
OIR    2025250     91400   19.9100 -112.9000      11.0       129       133        60
OIR    2025250     91400   19.9100 -112.9100      10.7       131       133        60
OIR    2025250     91400   19.9100 -112.9200      10.5       132       133        60
OIR    2025250     91400   19.9100 -112.9300      10.1       134       133        60
OIR    2025250     91400   19.9100 -112.9400      10.0       136       134        60
OIR    2025250     91400   19.9100 -112.9500       9.8       137       134        60
OIR    2025250     91400   19.9100 -112.9600       9.7       138       134        60
OIR    2025250     91400   19.9100 -112.9700       9.6       139       134        60
OIR    2025250     91400   19.9100 -112.9800       9.4       140       134        60
OIR    2025250     91400   19.9100 -112.9900       9.3       141       134        60
OIR    2025250     91400   19.9100 -113.0000       9.2       141       133        60
OIR    2025250     91400   19.9100 -113.0100       9.0       142       132        60
OIR    2025250     91400   19.9100 -113.0200       8.9       144       131        60
OIR    2025250     91400   19.9100 -113.0300       8.8       146       130        60
OIR    2025250     91400   19.9100 -113.0400       8.6       148       130        60
OIR    2025250     91400   19.9100 -113.0500       8.5       150       129        60
OIR    2025250     91400   19.9100 -113.0600       8.3       153       129        60
OIR    2025250     91400   19.9100 -113.0700       8.1       156       129        60
OIR    2025250     91400   19.9100 -113.0800       8.0       158       128        60
OIR    2025250     91400   19.9100 -113.0900       7.9       160       128        60
OIR    2025250     91400   19.9100 -113.1000       7.9       162       126        60
OIR    2025250     91400   19.9100 -113.1100       7.8       163       124        60
OIR    2025250     91400   19.9100 -113.1200       7.8       163       124        60
OIR    2025250     91400   19.9100 -113.1300       7.8       164       125        60
OIR    2025250     91400   19.9100 -113.1400       7.8       164       125        60
OIR    2025250     91400   19.9100 -113.1500       7.8       164       124        60
OIR    2025250     91400   19.9100 -113.1600       7.8       164       123        60
OIR    2025250     91400   19.9100 -113.1700       7.8       164       124        60
OIR    2025250     91400   19.9100 -113.1800       7.9       165       125        60
OIR    2025250     91400   19.9100 -113.1900       7.9       165       124        60
OIR    2025250     91400   19.9100 -113.2000       7.9       165       123        60
OIR    2025250     91400   19.9100 -113.2100       7.9       165       122        60
OIR    2025250     91400   19.9100 -113.2200       8.0       165       120        60
OIR    2025250     91400   19.9100 -113.2300       8.0       165       119        60
OIR    2025250     91400   19.9100 -113.2400       8.0       165       117        60
OIR    2025250     91400   19.9100 -113.2500       8.1       165       117        60
OIR    2025250     91400   19.9100 -113.2600       8.1       165       117        60
OIR    2025250     91400   19.9100 -113.2700       8.1       165       117        60
OIR    2025250     91400   19.9100 -113.2800       8.1       165       116        60
OIR    2025250     91400   19.9100 -113.2900       8.2       165       116        60
OIR    2025250     91400   19.9100 -113.3000       8.2       165       115        60
OIR    2025250     91400   19.9100 -113.3100       8.2       165       116        60
OIR    2025250     91400   19.9100 -113.3200       8.2       165       116        60
OIR    2025250     91400   19.9100 -113.3300       8.2       166       117        60
OIR    2025250     91400   19.9100 -113.3400       8.3       166       117        60
OIR    2025250     91400   19.9100 -113.3500       8.3       166       117        60
OIR    2025250     91400   19.9100 -113.3600       8.3       166       117        60
OIR    2025250     91400   19.9100 -113.3700       8.3       166       116        60
OIR    2025250     91400   19.9100 -113.3800       8.4       166       116        60
OIR    2025250     91400   19.9100 -113.3900       8.4       166       116        60
OIR    2025250     91400   19.9100 -113.4000       8.4       166       115        60
OIR    2025250     91400   19.9100 -113.4100       8.4       166       115        60
OIR    2025250     91400   19.9100 -113.4200       8.5       166       114        60
OIR    2025250     91400   19.9100 -113.4300       8.5       167       114        60
OIR    2025250     91400   19.9100 -113.4400       8.5       167       114        60
OIR    2025250     91400   19.9100 -113.4500       8.5       167       113        60
OIR    2025250     91400   19.9100 -113.4600       8.5       167       112        60
OIR    2025250     91400   19.9100 -113.4700       8.6       167       111        60
OIR    2025250     91400   19.9100 -113.4800       8.6       167       110        60
OIR    2025250     91400   19.9100 -113.4900       8.6       167       109        60
OIR    2025250     91400   19.9100 -113.5000       8.7       167       109        60
OIR    2025250     91400   19.9100 -113.5100       8.8       166       109        60
OIR    2025250     91400   19.9100 -113.5200       9.1       166       108        60
OIR    2025250     91400   19.9100 -113.5300       9.3       165       108        60
OIR    2025250     91400   19.9100 -113.5400       9.6       166       105        60
OIR    2025250     91400   19.9100 -113.5500      10.0       166       104        60
OIR    2025250     91400   19.9100 -113.5600      10.4       165       103        60
OIR    2025250     91400   19.9100 -113.5700      10.6       165       103        60
OIR    2025250     91400   19.9100 -113.5800      10.3       165       103        60
OIR    2025250     91400   19.9100 -113.5900       9.5       165       103        60
OIR    2025250     91400   19.9100 -113.6000       9.1       165       103        60
OIR    2025250     91400   19.9100 -113.6100       9.0       165       103        60
OIR    2025250     91400   19.9100 -113.6200       8.9       165       103        60
OIR    2025250     91400   19.9100 -113.6300       8.9       165       103        60
OIR    2025250     91400   19.9100 -113.6400       9.0       166       103        60
OIR    2025250     91400   19.9100 -113.6500       9.0       166       103        60
OIR    2025250     91400   19.9100 -113.6600       9.1       166       104        60
OIR    2025250     91400   19.9100 -113.6700       9.1       167       104        60
OIR    2025250     91400   19.9100 -113.6800       9.1       167       104        60
OIR    2025250     91400   19.9100 -113.6900       9.2       167       105        60
OIR    2025250     91400   19.9100 -113.7000       9.2       168       105        60
OIR    2025250     91400   19.9100 -113.7100       9.2       168       105        60
OIR    2025250     91400   19.9100 -113.7200       9.2       169       107        60
OIR    2025250     91400   19.9100 -113.7300       9.3       169       108        60
OIR    2025250     91400   19.9100 -113.7400       9.2       170       109        60
OIR    2025250     91400   19.9100 -113.7500       9.2       171       109        60
OIR    2025250     91400   19.9100 -113.7600       9.2       171       109        60
OIR    2025250     91400   19.9100 -113.7700       9.3       171       108        60
OIR    2025250     91400   19.9100 -113.7800       9.3       172       108        60
OIR    2025250     91400   19.9100 -113.7900       9.3       172       107        60
OIR    2025250     91400   19.9100 -113.8000       9.3       172       107        60
OIR    2025250     91400   19.9100 -113.8100       9.3       172       108        60
OIR    2025250     91400   19.9100 -113.8200       9.3       172       108        60
OIR    2025250     91400   19.9100 -113.8300       9.3       172       108        60
OIR    2025250     91400   19.9100 -113.8400       9.3       172       107        60
OIR    2025250     91400   19.9100 -113.8500       9.4       172       107        60
OIR    2025250     91400   19.9100 -113.8600       9.4       172       107        60
OIR    2025250     91400   19.9100 -113.8700       9.4       173       108        60
OIR    2025250     91400   19.9100 -113.8800       9.5       173       108        60
OIR    2025250     91400   19.9100 -113.8900       9.5       173       111        60
OIR    2025250     91400   19.9100 -113.9000       9.5       173       114        60
OIR    2025250     91400   19.9100 -113.9100       9.6       174       112        60
OIR    2025250     91400   19.9100 -113.9200       9.6       174       110        60
OIR    2025250     91400   19.9100 -113.9300       9.6       174       109        60
OIR    2025250     91400   19.9100 -113.9400       9.6       175       108        60
OIR    2025250     91400   19.9100 -113.9500       9.5       175       107        60
OIR    2025250     91400   19.9100 -113.9600       9.5       176       107        60
OIR    2025250     91400   19.9100 -113.9700       9.5       177       107        60
OIR    2025250     91400   19.9100 -113.9800       9.4       177       107        60
OIR    2025250     91400   19.9100 -113.9900       9.4       178       108        60
OIR    2025250     91400   19.9100 -114.0000       9.4       178       109        60
OIR    2025250     91400   19.9100 -114.0100       9.5       178       109        60
OIR    2025250     91400   19.9100 -114.0200       9.5       179       108        60
OIR    2025250     91400   19.9100 -114.0300       9.5       179       108        60
OIR    2025250     91400   19.9100 -114.0400       9.5       179       108        60
OIR    2025250     91400   19.9100 -114.0500       9.6       180       108        60
OIR    2025250     91400   19.9100 -114.0600       9.6       181       108        60
OIR    2025250     91400   19.9100 -114.0700       9.6       183       108        60
OIR    2025250     91400   19.9100 -114.0800       9.6       184       107        60
OIR    2025250     91400   19.9100 -114.0900       9.7       185       108        60
OIR    2025250     91400   19.9100 -114.1000       9.7       186       111        60
OIR    2025250     91400   19.9100 -114.1100       9.8       187       113        60
OIR    2025250     91400   19.9100 -114.1200       9.8       187       113        60
OIR    2025250     91400   19.9100 -114.1300       9.8       188       114        60
OIR    2025250     91400   19.9100 -114.1400       9.8       188       113        60
OIR    2025250     91400   19.9100 -114.1500       9.8       189       112        60
OIR    2025250     91400   19.9100 -114.1600       9.7       190       112        60
OIR    2025250     91400   19.9100 -114.1700       9.5       193       112        60
OIR    2025250     91400   19.9100 -114.1800       9.4       205       114        60
OIR    2025250     91400   19.9100 -114.1900       9.4       209       116        60
OIR    2025250     91400   19.9100 -114.2000       9.4       210       117        60
OIR    2025250     91400   19.9100 -114.2100       9.3       211       117        60
OIR    2025250     91400   19.9100 -114.2200       9.3       212       119        60
OIR    2025250     91400   19.9100 -114.2300       9.2       213       121        60
OIR    2025250     91400   19.9100 -114.2400       9.2       213       123        60
OIR    2025250     91400   19.9100 -114.2500       9.1       214       124        60
OIR    2025250     91400   19.9100 -114.2600       9.1       214       125        60
OIR    2025250     91400   19.9100 -114.2700       9.1       215       126        60
OIR    2025250     91400   19.9100 -114.2800       9.0       216       126        60
OIR    2025250     91400   19.9100 -114.2900       9.0       216       126        60
OIR    2025250     91400   19.9100 -114.3000       8.9       217       126        60
OIR    2025250     91400   19.9100 -114.3100       8.9       217       126        60
OIR    2025250     91400   19.9100 -114.3200       8.8       218       126        60
OIR    2025250     91400   19.9100 -114.3300       8.8       218       125        60
OIR    2025250     91400   19.9100 -114.3400       8.8       218       124        60
OIR    2025250     91400   19.9100 -114.3500       8.8       218       125        60
OIR    2025250     91400   19.9100 -114.3600       8.8       218       125        60
OIR    2025250     91400   19.9100 -114.3700       8.8       218       126        60
OIR    2025250     91400   19.9100 -114.3800       8.8       218       126        60
OIR    2025250     91400   19.9100 -114.3900       8.8       218       127        60
OIR    2025250     91400   19.9100 -114.4000       8.8       218       128        60
OIR    2025250     91400   19.9100 -114.4100       8.8       218       130        60
OIR    2025250     91400   19.9100 -114.4200       8.7       218       132        60
OIR    2025250     91400   19.9100 -114.4300       8.7       218       134        60
OIR    2025250     91400   19.9100 -114.4400       8.6       219       137        60
OIR    2025250     91400   19.9100 -114.4500       8.5       219       139        60
OIR    2025250     91400   19.9100 -115.9900      11.6       157       141        60
OIR    2025250     91400   19.9100 -116.0000      11.6       157       140        60
OIR    2025250     91400   19.9100 -116.0100      11.6       157       140        60
OIR    2025250     91400   19.9100 -116.0200      11.6       157       139        60
OIR    2025250     91400   19.9100 -116.0300      11.7       158       139        60
OIR    2025250     91400   19.9100 -116.0400      11.7       158       141        60
OIR    2025250     91400   19.9100 -116.0900      12.1       172       140        60
OIR    2025250     91400   19.9100 -116.1000      12.1       173       139        60
OIR    2025250     91400   19.9100 -116.1100      12.2       176       141        60
OIR    2025250     91400   19.9100 -116.1300      12.3       176       142        60
OIR    2025250     91400   19.9100 -116.1400      12.3       176       141        60
OIR    2025250     91400   19.9100 -116.1500      12.3       176       139        60
OIR    2025250     91400   19.9100 -116.1600      12.3       176       137        60
OIR    2025250     91400   19.9100 -116.1700      12.3       176       137        60
OIR    2025250     91400   19.9100 -116.1800      12.3       176       139        60
OIR    2025250     91400   19.9100 -116.1900      12.3       177       140        60
OIR    2025250     91400   19.9100 -116.2000      12.2       177       141        60
OIR    2025250     91400   19.9000 -112.1900       4.2       101       140        60
OIR    2025250     91400   19.9000 -112.2000       4.7       103       139        60
OIR    2025250     91400   19.9000 -112.2100       5.1       104       138        60
OIR    2025250     91400   19.9000 -112.2200       5.4       105       137        60
OIR    2025250     91400   19.9000 -112.2300       5.7       106       137        60
OIR    2025250     91400   19.9000 -112.2400       6.1       107       138        60
OIR    2025250     91400   19.9000 -112.2500       6.4       108       138        60
OIR    2025250     91400   19.9000 -112.2600       6.8       109       139        60
OIR    2025250     91400   19.9000 -112.2700       7.1       109       140        60
OIR    2025250     91400   19.9000 -112.2800       7.3       109       140        60
OIR    2025250     91400   19.9000 -112.2900       7.5       109       138        60
OIR    2025250     91400   19.9000 -112.3000       7.6       109       138        60
OIR    2025250     91400   19.9000 -112.3100       7.7       108       138        60
OIR    2025250     91400   19.9000 -112.3200       7.9       107       138        60
OIR    2025250     91400   19.9000 -112.3300       8.2       106       137        60
OIR    2025250     91400   19.9000 -112.3400       8.5       104       137        60
OIR    2025250     91400   19.9000 -112.3500       9.0       101       136        60
OIR    2025250     91400   19.9000 -112.3600       9.2        99       135        60
OIR    2025250     91400   19.9000 -112.3700       9.0        96       136        60
OIR    2025250     91400   19.9000 -112.3800       9.4        81       140        60
OIR    2025250     91400   19.9000 -112.8000      10.8       123       139        60
OIR    2025250     91400   19.9000 -112.8100      11.0       124       137        60
OIR    2025250     91400   19.9000 -112.8200      11.2       125       135        60
OIR    2025250     91400   19.9000 -112.8300      11.3       125       133        60
OIR    2025250     91400   19.9000 -112.8400      11.4       125       132        60
OIR    2025250     91400   19.9000 -112.8500      11.5       126       133        60
OIR    2025250     91400   19.9000 -112.8600      11.5       126       133        60
OIR    2025250     91400   19.9000 -112.8700      11.4       127       133        60
OIR    2025250     91400   19.9000 -112.8800      11.3       127       133        60
OIR    2025250     91400   19.9000 -112.8900      11.2       128       133        60
OIR    2025250     91400   19.9000 -112.9000      11.0       129       133        60
OIR    2025250     91400   19.9000 -112.9100      10.7       131       133        60
OIR    2025250     91400   19.9000 -112.9200      10.4       133       133        60
OIR    2025250     91400   19.9000 -112.9300      10.1       135       133        60
OIR    2025250     91400   19.9000 -112.9400       9.9       136       133        60
OIR    2025250     91400   19.9000 -112.9500       9.7       137       134        60
OIR    2025250     91400   19.9000 -112.9600       9.6       138       134        60
OIR    2025250     91400   19.9000 -112.9700       9.5       139       133        60
OIR    2025250     91400   19.9000 -112.9800       9.4       140       133        60
OIR    2025250     91400   19.9000 -112.9900       9.3       141       133        60
OIR    2025250     91400   19.9000 -113.0000       9.1       142       133        60
OIR    2025250     91400   19.9000 -113.0100       8.9       144       132        60
OIR    2025250     91400   19.9000 -113.0200       8.7       146       131        60
OIR    2025250     91400   19.9000 -113.0300       8.6       149       130        60
OIR    2025250     91400   19.9000 -113.0400       8.5       151       129        60
OIR    2025250     91400   19.9000 -113.0500       8.3       154       129        60
OIR    2025250     91400   19.9000 -113.0600       8.1       157       129        60
OIR    2025250     91400   19.9000 -113.0700       8.1       159       129        60
OIR    2025250     91400   19.9000 -113.0800       8.0       161       128        60
OIR    2025250     91400   19.9000 -113.0900       7.9       163       127        60
OIR    2025250     91400   19.9000 -113.1000       7.8       164       125        60
OIR    2025250     91400   19.9000 -113.1100       7.8       164       123        60
OIR    2025250     91400   19.9000 -113.1200       7.8       164       121        60
OIR    2025250     91400   19.9000 -113.1300       7.8       165       123        60
OIR    2025250     91400   19.9000 -113.1400       7.8       165       125        60
OIR    2025250     91400   19.9000 -113.1500       7.8       165       125        60
OIR    2025250     91400   19.9000 -113.1600       7.8       165       125        60
OIR    2025250     91400   19.9000 -113.1700       7.9       165       124        60
OIR    2025250     91400   19.9000 -113.1800       7.9       165       124        60
OIR    2025250     91400   19.9000 -113.1900       7.9       165       124        60
OIR    2025250     91400   19.9000 -113.2000       7.9       165       122        60
OIR    2025250     91400   19.9000 -113.2100       7.9       165       121        60
OIR    2025250     91400   19.9000 -113.2200       8.0       165       120        60
OIR    2025250     91400   19.9000 -113.2300       8.0       165       119        60
OIR    2025250     91400   19.9000 -113.2400       8.0       165       116        60
OIR    2025250     91400   19.9000 -113.2500       8.0       165       115        60
OIR    2025250     91400   19.9000 -113.2600       8.1       165       114        60
OIR    2025250     91400   19.9000 -113.2700       8.1       165       114        60
OIR    2025250     91400   19.9000 -113.2800       8.1       166       115        60
OIR    2025250     91400   19.9000 -113.2900       8.1       166       115        60
OIR    2025250     91400   19.9000 -113.3000       8.2       166       115        60
OIR    2025250     91400   19.9000 -113.3100       8.2       166       116        60
OIR    2025250     91400   19.9000 -113.3200       8.2       166       116        60
OIR    2025250     91400   19.9000 -113.3300       8.2       166       116        60
OIR    2025250     91400   19.9000 -113.3400       8.2       166       116        60
OIR    2025250     91400   19.9000 -113.3500       8.3       166       116        60
OIR    2025250     91400   19.9000 -113.3600       8.3       166       116        60
OIR    2025250     91400   19.9000 -113.3700       8.3       166       116        60
OIR    2025250     91400   19.9000 -113.3800       8.3       166       116        60
OIR    2025250     91400   19.9000 -113.3900       8.4       166       115        60
OIR    2025250     91400   19.9000 -113.4000       8.4       166       114        60
OIR    2025250     91400   19.9000 -113.4100       8.4       166       114        60
OIR    2025250     91400   19.9000 -113.4200       8.4       167       114        60
OIR    2025250     91400   19.9000 -113.4300       8.5       167       113        60
OIR    2025250     91400   19.9000 -113.4400       8.5       167       112        60
OIR    2025250     91400   19.9000 -113.4500       8.5       167       112        60
OIR    2025250     91400   19.9000 -113.4600       8.5       167       111        60
OIR    2025250     91400   19.9000 -113.4700       8.5       167       110        60
OIR    2025250     91400   19.9000 -113.4800       8.5       167       109        60
OIR    2025250     91400   19.9000 -113.4900       8.5       167       108        60
OIR    2025250     91400   19.9000 -113.5000       8.6       167       107        60
OIR    2025250     91400   19.9000 -113.5100       8.6       167       107        60
OIR    2025250     91400   19.9000 -113.5200       8.7       167       108        60
OIR    2025250     91400   19.9000 -113.5300       8.8       166       108        60
OIR    2025250     91400   19.9000 -113.5400       8.9       166       107        60
OIR    2025250     91400   19.9000 -113.5500       9.0       166       104        60
OIR    2025250     91400   19.9000 -113.5600       8.8       167       104        60
OIR    2025250     91400   19.9000 -113.5700       8.6       167       103        60
OIR    2025250     91400   19.9000 -113.5800       8.6       167       103        60
OIR    2025250     91400   19.9000 -113.5900       8.6       166       103        60
OIR    2025250     91400   19.9000 -113.6000       8.7       166       103        60
OIR    2025250     91400   19.9000 -113.6100       8.7       166       103        60
OIR    2025250     91400   19.9000 -113.6200       8.8       166       103        60
OIR    2025250     91400   19.9000 -113.6300       8.8       166       103        60
OIR    2025250     91400   19.9000 -113.6400       8.9       166       103        60
OIR    2025250     91400   19.9000 -113.6500       8.9       166       103        60
OIR    2025250     91400   19.9000 -113.6600       9.0       166       104        60
OIR    2025250     91400   19.9000 -113.6700       9.0       167       104        60
OIR    2025250     91400   19.9000 -113.6800       9.1       167       104        60
OIR    2025250     91400   19.9000 -113.6900       9.1       167       105        60
OIR    2025250     91400   19.9000 -113.7000       9.1       168       107        60
OIR    2025250     91400   19.9000 -113.7100       9.2       168       107        60
OIR    2025250     91400   19.9000 -113.7200       9.2       169       105        60
OIR    2025250     91400   19.9000 -113.7300       9.2       170       108        60
OIR    2025250     91400   19.9000 -113.7400       9.2       170       109        60
OIR    2025250     91400   19.9000 -113.7500       9.2       171       109        60
OIR    2025250     91400   19.9000 -113.7600       9.2       171       109        60
OIR    2025250     91400   19.9000 -113.7700       9.2       172       108        60
OIR    2025250     91400   19.9000 -113.7800       9.2       172       108        60
OIR    2025250     91400   19.9000 -113.7900       9.3       172       107        60
OIR    2025250     91400   19.9000 -113.8000       9.3       172       107        60
OIR    2025250     91400   19.9000 -113.8100       9.3       172       107        60
OIR    2025250     91400   19.9000 -113.8200       9.3       172       107        60
OIR    2025250     91400   19.9000 -113.8300       9.3       172       107        60
OIR    2025250     91400   19.9000 -113.8400       9.3       172       107        60
OIR    2025250     91400   19.9000 -113.8500       9.3       173       107        60
OIR    2025250     91400   19.9000 -113.8600       9.4       173       107        60
OIR    2025250     91400   19.9000 -113.8700       9.4       173       108        60
OIR    2025250     91400   19.9000 -113.8800       9.5       173       108        60
OIR    2025250     91400   19.9000 -113.8900       9.5       174       109        60
OIR    2025250     91400   19.9000 -113.9000       9.5       174       110        60
OIR    2025250     91400   19.9000 -113.9100       9.6       174       110        60
OIR    2025250     91400   19.9000 -113.9200       9.6       174       108        60
OIR    2025250     91400   19.9000 -113.9300       9.6       175       107        60
OIR    2025250     91400   19.9000 -113.9400       9.5       175       107        60
OIR    2025250     91400   19.9000 -113.9500       9.5       176       107        60
OIR    2025250     91400   19.9000 -113.9600       9.5       176       105        60
OIR    2025250     91400   19.9000 -113.9700       9.5       177       105        60
OIR    2025250     91400   19.9000 -113.9800       9.4       178       107        60
OIR    2025250     91400   19.9000 -113.9900       9.4       178       107        60
OIR    2025250     91400   19.9000 -114.0000       9.4       178       107        60
OIR    2025250     91400   19.9000 -114.0100       9.5       178       107        60
OIR    2025250     91400   19.9000 -114.0200       9.5       179       107        60
OIR    2025250     91400   19.9000 -114.0300       9.5       179       107        60
OIR    2025250     91400   19.9000 -114.0400       9.5       179       107        60
OIR    2025250     91400   19.9000 -114.0500       9.5       180       108        60
OIR    2025250     91400   19.9000 -114.0600       9.5       181       108        60
OIR    2025250     91400   19.9000 -114.0700       9.5       182       109        60
OIR    2025250     91400   19.9000 -114.0800       9.6       184       109        60
OIR    2025250     91400   19.9000 -114.0900       9.6       185       110        60
OIR    2025250     91400   19.9000 -114.1000       9.6       185       112        60
OIR    2025250     91400   19.9000 -114.1100       9.7       187       113        60
OIR    2025250     91400   19.9000 -114.1200       9.7       187       114        60
OIR    2025250     91400   19.9000 -114.1300       9.8       188       114        60
OIR    2025250     91400   19.9000 -114.1400       9.7       189       114        60
OIR    2025250     91400   19.9000 -114.1500       9.7       189       113        60
OIR    2025250     91400   19.9000 -114.1600       9.7       191       113        60
OIR    2025250     91400   19.9000 -114.1700       9.6       194       113        60
OIR    2025250     91400   19.9000 -114.1800       9.5       204       114        60
OIR    2025250     91400   19.9000 -114.1900       9.5       209       115        60
OIR    2025250     91400   19.9000 -114.2000       9.4       210       116        60
OIR    2025250     91400   19.9000 -114.2100       9.3       211       116        60
OIR    2025250     91400   19.9000 -114.2200       9.3       212       117        60
OIR    2025250     91400   19.9000 -114.2300       9.2       213       119        60
OIR    2025250     91400   19.9000 -114.2400       9.1       214       121        60
OIR    2025250     91400   19.9000 -114.2500       9.1       214       123        60
OIR    2025250     91400   19.9000 -114.2600       9.0       215       124        60
OIR    2025250     91400   19.9000 -114.2700       9.0       215       125        60
OIR    2025250     91400   19.9000 -114.2800       9.0       216       126        60
OIR    2025250     91400   19.9000 -114.2900       9.0       216       127        60
OIR    2025250     91400   19.9000 -114.3000       8.9       217       127        60
OIR    2025250     91400   19.9000 -114.3100       8.9       217       126        60
OIR    2025250     91400   19.9000 -114.3200       8.8       218       126        60
OIR    2025250     91400   19.9000 -114.3300       8.8       218       125        60
OIR    2025250     91400   19.9000 -114.3400       8.8       218       124        60
OIR    2025250     91400   19.9000 -114.3500       8.8       218       124        60
OIR    2025250     91400   19.9000 -114.3600       8.8       218       125        60
OIR    2025250     91400   19.9000 -114.3700       8.8       218       125        60
OIR    2025250     91400   19.9000 -114.3800       8.8       218       126        60
OIR    2025250     91400   19.9000 -114.3900       8.8       218       126        60
OIR    2025250     91400   19.9000 -114.4000       8.7       218       127        60
OIR    2025250     91400   19.9000 -114.4100       8.7       218       128        60
OIR    2025250     91400   19.9000 -114.4200       8.7       218       129        60
OIR    2025250     91400   19.9000 -114.4300       8.6       219       131        60
OIR    2025250     91400   19.9000 -114.4400       8.6       219       133        60
OIR    2025250     91400   19.9000 -114.4500       8.5       219       134        60
OIR    2025250     91400   19.9000 -114.4600       8.3       220       137        60
OIR    2025250     91400   19.9000 -114.4700       8.2       220       140        60
OIR    2025250     91400   19.9000 -115.9900      11.3       158       140        60
OIR    2025250     91400   19.9000 -116.0000      11.5       157       138        60
OIR    2025250     91400   19.9000 -116.0100      11.6       157       137        60
OIR    2025250     91400   19.9000 -116.0200      11.6       157       138        60
OIR    2025250     91400   19.9000 -116.0300      11.7       158       139        60
OIR    2025250     91400   19.9000 -116.0400      11.7       158       141        60
OIR    2025250     91400   19.9000 -116.0900      12.1       172       142        60
OIR    2025250     91400   19.9000 -116.1000      12.1       173       139        60
OIR    2025250     91400   19.9000 -116.1100      12.2       176       141        60
OIR    2025250     91400   19.9000 -116.1300      12.2       176       142        60
OIR    2025250     91400   19.9000 -116.1400      12.3       176       139        60
OIR    2025250     91400   19.9000 -116.1500      12.3       176       137        60
OIR    2025250     91400   19.9000 -116.1600      12.3       176       136        60
OIR    2025250     91400   19.9000 -116.1700      12.3       176       137        60
OIR    2025250     91400   19.9000 -116.1800      12.3       176       140        60
OIR    2025250     91400   19.9000 -116.2000      12.3       177       142        60
OIR    2025250     91400   19.9000 -116.2100      12.3       177       142        60
OIR    2025250     91400   19.8900 -112.1900       4.3       106       139        60
OIR    2025250     91400   19.8900 -112.2000       4.8       106       138        60
OIR    2025250     91400   19.8900 -112.2100       5.3       107       138        60
OIR    2025250     91400   19.8900 -112.2200       5.6       108       138        60
OIR    2025250     91400   19.8900 -112.2300       6.0       109       138        60
OIR    2025250     91400   19.8900 -112.2400       6.3       110       139        60
OIR    2025250     91400   19.8900 -112.2500       6.7       111       139        60
OIR    2025250     91400   19.8900 -112.2600       7.1       111       140        60
OIR    2025250     91400   19.8900 -112.2900       7.5       111       140        60
OIR    2025250     91400   19.8900 -112.3000       7.6       110       138        60
OIR    2025250     91400   19.8900 -112.3100       7.7       110       138        60
OIR    2025250     91400   19.8900 -112.3200       7.9       109       138        60
OIR    2025250     91400   19.8900 -112.3300       8.2       108       138        60
OIR    2025250     91400   19.8900 -112.3400       8.5       107       138        60
OIR    2025250     91400   19.8900 -112.3500       8.9       105       138        60
OIR    2025250     91400   19.8900 -112.3600       9.3       103       138        60
OIR    2025250     91400   19.8900 -112.3700       9.4       101       137        60
OIR    2025250     91400   19.8900 -112.7900      10.8       123       138        60
OIR    2025250     91400   19.8900 -112.8000      10.9       124       137        60
OIR    2025250     91400   19.8900 -112.8100      11.1       125       135        60
OIR    2025250     91400   19.8900 -112.8200      11.2       126       134        60
OIR    2025250     91400   19.8900 -112.8300      11.3       126       133        60
OIR    2025250     91400   19.8900 -112.8400      11.4       126       132        60
OIR    2025250     91400   19.8900 -112.8500      11.4       126       132        60
OIR    2025250     91400   19.8900 -112.8600      11.4       127       133        60
OIR    2025250     91400   19.8900 -112.8700      11.3       127       133        60
OIR    2025250     91400   19.8900 -112.8800      11.2       128       133        60
OIR    2025250     91400   19.8900 -112.8900      11.1       129       133        60
OIR    2025250     91400   19.8900 -112.9000      10.9       130       133        60
OIR    2025250     91400   19.8900 -112.9100      10.6       131       133        60
OIR    2025250     91400   19.8900 -112.9200      10.2       133       133        60
OIR    2025250     91400   19.8900 -112.9300       9.9       135       132        60
OIR    2025250     91400   19.8900 -112.9400       9.8       136       133        60
OIR    2025250     91400   19.8900 -112.9500       9.6       137       133        60
OIR    2025250     91400   19.8900 -112.9600       9.5       139       133        60
OIR    2025250     91400   19.8900 -112.9700       9.4       140       132        60
OIR    2025250     91400   19.8900 -112.9800       9.3       141       132        60
OIR    2025250     91400   19.8900 -112.9900       9.2       143       132        60
OIR    2025250     91400   19.8900 -113.0000       9.0       144       132        60
OIR    2025250     91400   19.8900 -113.0100       8.8       147       131        60
OIR    2025250     91400   19.8900 -113.0200       8.6       150       131        60
OIR    2025250     91400   19.8900 -113.0300       8.4       152       130        60
OIR    2025250     91400   19.8900 -113.0400       8.2       155       128        60
OIR    2025250     91400   19.8900 -113.0500       8.1       158       127        60
OIR    2025250     91400   19.8900 -113.0600       8.1       159       128        60
OIR    2025250     91400   19.8900 -113.0700       8.0       161       129        60
OIR    2025250     91400   19.8900 -113.0800       7.9       163       129        60
OIR    2025250     91400   19.8900 -113.0900       7.9       164       128        60
OIR    2025250     91400   19.8900 -113.1000       7.8       165       127        60
OIR    2025250     91400   19.8900 -113.1100       7.8       165       125        60
OIR    2025250     91400   19.8900 -113.1200       7.8       165       124        60
OIR    2025250     91400   19.8900 -113.1300       7.8       165       123        60
OIR    2025250     91400   19.8900 -113.1400       7.8       165       122        60
OIR    2025250     91400   19.8900 -113.1500       7.8       165       123        60
OIR    2025250     91400   19.8900 -113.1600       7.8       165       123        60
OIR    2025250     91400   19.8900 -113.1700       7.9       165       123        60
OIR    2025250     91400   19.8900 -113.1800       7.9       165       122        60
OIR    2025250     91400   19.8900 -113.1900       7.9       165       122        60
OIR    2025250     91400   19.8900 -113.2000       7.9       166       121        60
OIR    2025250     91400   19.8900 -113.2100       7.9       166       119        60
OIR    2025250     91400   19.8900 -113.2200       8.0       166       119        60
OIR    2025250     91400   19.8900 -113.2300       8.0       166       119        60
OIR    2025250     91400   19.8900 -113.2400       8.0       166       117        60
OIR    2025250     91400   19.8900 -113.2500       8.0       166       115        60
OIR    2025250     91400   19.8900 -113.2600       8.0       166       113        60
OIR    2025250     91400   19.8900 -113.2700       8.1       166       114        60
OIR    2025250     91400   19.8900 -113.2800       8.1       166       114        60
OIR    2025250     91400   19.8900 -113.2900       8.1       166       115        60
OIR    2025250     91400   19.8900 -113.3000       8.1       166       115        60
OIR    2025250     91400   19.8900 -113.3100       8.2       166       116        60
OIR    2025250     91400   19.8900 -113.3200       8.2       166       116        60
OIR    2025250     91400   19.8900 -113.3300       8.2       166       116        60
OIR    2025250     91400   19.8900 -113.3400       8.2       166       116        60
OIR    2025250     91400   19.8900 -113.3500       8.3       166       115        60
OIR    2025250     91400   19.8900 -113.3600       8.3       166       115        60
OIR    2025250     91400   19.8900 -113.3700       8.3       166       116        60
OIR    2025250     91400   19.8900 -113.3800       8.3       166       115        60
OIR    2025250     91400   19.8900 -113.3900       8.3       166       114        60
OIR    2025250     91400   19.8900 -113.4000       8.4       167       112        60
OIR    2025250     91400   19.8900 -113.4100       8.4       167       113        60
OIR    2025250     91400   19.8900 -113.4200       8.4       167       113        60
OIR    2025250     91400   19.8900 -113.4300       8.4       167       112        60
OIR    2025250     91400   19.8900 -113.4400       8.5       167       110        60
OIR    2025250     91400   19.8900 -113.4500       8.5       167       110        60
OIR    2025250     91400   19.8900 -113.4600       8.5       167       111        60
OIR    2025250     91400   19.8900 -113.4700       8.5       167       110        60
OIR    2025250     91400   19.8900 -113.4800       8.5       167       108        60
OIR    2025250     91400   19.8900 -113.4900       8.5       167       107        60
OIR    2025250     91400   19.8900 -113.5000       8.5       167       105        60
OIR    2025250     91400   19.8900 -113.5100       8.5       167       105        60
OIR    2025250     91400   19.8900 -113.5200       8.5       167       105        60
OIR    2025250     91400   19.8900 -113.5300       8.5       167       107        60
OIR    2025250     91400   19.8900 -113.5400       8.5       167       107        60
OIR    2025250     91400   19.8900 -113.5500       8.5       167       105        60
OIR    2025250     91400   19.8900 -113.5600       8.5       167       104        60
OIR    2025250     91400   19.8900 -113.5700       8.5       167       104        60
OIR    2025250     91400   19.8900 -113.5800       8.5       167       103        60
OIR    2025250     91400   19.8900 -113.5900       8.5       167       103        60
OIR    2025250     91400   19.8900 -113.6000       8.6       166       103        60
OIR    2025250     91400   19.8900 -113.6100       8.6       166       103        60
OIR    2025250     91400   19.8900 -113.6200       8.6       166       103        60
OIR    2025250     91400   19.8900 -113.6300       8.7       166       103        60
OIR    2025250     91400   19.8900 -113.6400       8.8       166       103        60
OIR    2025250     91400   19.8900 -113.6500       8.8       166       103        60
OIR    2025250     91400   19.8900 -113.6600       8.9       167       104        60
OIR    2025250     91400   19.8900 -113.6700       9.0       167       104        60
OIR    2025250     91400   19.8900 -113.6800       9.0       167       104        60
OIR    2025250     91400   19.8900 -113.6900       9.1       168       105        60
OIR    2025250     91400   19.8900 -113.7000       9.1       168       107        60
OIR    2025250     91400   19.8900 -113.7100       9.1       169       107        60
OIR    2025250     91400   19.8900 -113.7200       9.2       169       107        60
OIR    2025250     91400   19.8900 -113.7300       9.2       170       108        60
OIR    2025250     91400   19.8900 -113.7400       9.2       171       108        60
OIR    2025250     91400   19.8900 -113.7500       9.2       171       109        60
OIR    2025250     91400   19.8900 -113.7600       9.2       171       108        60
OIR    2025250     91400   19.8900 -113.7700       9.2       172       108        60
OIR    2025250     91400   19.8900 -113.7800       9.2       172       107        60
OIR    2025250     91400   19.8900 -113.7900       9.2       172       105        60
OIR    2025250     91400   19.8900 -113.8000       9.2       172       105        60
OIR    2025250     91400   19.8900 -113.8100       9.2       172       107        60
OIR    2025250     91400   19.8900 -113.8200       9.3       173       107        60
OIR    2025250     91400   19.8900 -113.8300       9.3       173       107        60
OIR    2025250     91400   19.8900 -113.8400       9.3       173       107        60
OIR    2025250     91400   19.8900 -113.8500       9.3       173       107        60
OIR    2025250     91400   19.8900 -113.8600       9.3       173       107        60
OIR    2025250     91400   19.8900 -113.8700       9.4       174       107        60
OIR    2025250     91400   19.8900 -113.8800       9.4       174       108        60
OIR    2025250     91400   19.8900 -113.8900       9.5       174       108        60
OIR    2025250     91400   19.8900 -113.9000       9.5       174       108        60
OIR    2025250     91400   19.8900 -113.9100       9.5       175       108        60
OIR    2025250     91400   19.8900 -113.9200       9.5       175       107        60
OIR    2025250     91400   19.8900 -113.9300       9.5       175       105        60
OIR    2025250     91400   19.8900 -113.9400       9.5       176       105        60
OIR    2025250     91400   19.8900 -113.9500       9.5       176       105        60
OIR    2025250     91400   19.8900 -113.9600       9.4       177       105        60
OIR    2025250     91400   19.8900 -113.9700       9.4       177       105        60
OIR    2025250     91400   19.8900 -113.9800       9.4       178       105        60
OIR    2025250     91400   19.8900 -113.9900       9.4       178       105        60
OIR    2025250     91400   19.8900 -114.0000       9.4       178       105        60
OIR    2025250     91400   19.8900 -114.0100       9.4       178       105        60
OIR    2025250     91400   19.8900 -114.0200       9.4       179       105        60
OIR    2025250     91400   19.8900 -114.0300       9.5       179       105        60
OIR    2025250     91400   19.8900 -114.0400       9.5       179       105        60
OIR    2025250     91400   19.8900 -114.0500       9.5       180       107        60
OIR    2025250     91400   19.8900 -114.0600       9.5       180       108        60
OIR    2025250     91400   19.8900 -114.0700       9.5       182       109        60
OIR    2025250     91400   19.8900 -114.0800       9.5       184       111        60
OIR    2025250     91400   19.8900 -114.0900       9.5       185       112        60
OIR    2025250     91400   19.8900 -114.1000       9.6       185       113        60
OIR    2025250     91400   19.8900 -114.1100       9.7       187       114        60
OIR    2025250     91400   19.8900 -114.1200       9.7       187       114        60
OIR    2025250     91400   19.8900 -114.1300       9.7       188       114        60
OIR    2025250     91400   19.8900 -114.1400       9.7       189       114        60
OIR    2025250     91400   19.8900 -114.1500       9.7       190       114        60
OIR    2025250     91400   19.8900 -114.1600       9.6       191       114        60
OIR    2025250     91400   19.8900 -114.1700       9.6       194       114        60
OIR    2025250     91400   19.8900 -114.1800       9.6       202       115        60
OIR    2025250     91400   19.8900 -114.1900       9.5       208       115        60
OIR    2025250     91400   19.8900 -114.2000       9.5       210       115        60
OIR    2025250     91400   19.8900 -114.2100       9.4       211       115        60
OIR    2025250     91400   19.8900 -114.2200       9.3       212       116        60
OIR    2025250     91400   19.8900 -114.2300       9.2       213       117        60
OIR    2025250     91400   19.8900 -114.2400       9.1       214       120        60
OIR    2025250     91400   19.8900 -114.2500       9.0       215       122        60
OIR    2025250     91400   19.8900 -114.2600       9.0       215       124        60
OIR    2025250     91400   19.8900 -114.2700       9.0       216       126        60
OIR    2025250     91400   19.8900 -114.2800       9.0       216       127        60
OIR    2025250     91400   19.8900 -114.2900       9.0       216       128        60
OIR    2025250     91400   19.8900 -114.3000       8.9       217       128        60
OIR    2025250     91400   19.8900 -114.3100       8.9       218       127        60
OIR    2025250     91400   19.8900 -114.3200       8.8       218       126        60
OIR    2025250     91400   19.8900 -114.3300       8.8       218       125        60
OIR    2025250     91400   19.8900 -114.3400       8.8       218       124        60
OIR    2025250     91400   19.8900 -114.3500       8.8       218       124        60
OIR    2025250     91400   19.8900 -114.3600       8.8       218       125        60
OIR    2025250     91400   19.8900 -114.3700       8.8       218       126        60
OIR    2025250     91400   19.8900 -114.3800       8.7       218       127        60
OIR    2025250     91400   19.8900 -114.3900       8.7       218       128        60
OIR    2025250     91400   19.8900 -114.4000       8.7       218       127        60
OIR    2025250     91400   19.8900 -114.4100       8.7       218       127        60
OIR    2025250     91400   19.8900 -114.4200       8.6       218       128        60
OIR    2025250     91400   19.8900 -114.4300       8.6       219       128        60
OIR    2025250     91400   19.8900 -114.4400       8.5       219       130        60
OIR    2025250     91400   19.8900 -114.4500       8.4       219       132        60
OIR    2025250     91400   19.8900 -114.4600       8.3       220       133        60
OIR    2025250     91400   19.8900 -114.4700       8.2       220       135        60
OIR    2025250     91400   19.8900 -114.4800       8.1       220       137        60
OIR    2025250     91400   19.8900 -115.9800      10.9       158       142        60
OIR    2025250     91400   19.8900 -115.9900      11.1       158       139        60
OIR    2025250     91400   19.8900 -116.0000      11.3       158       137        60
OIR    2025250     91400   19.8900 -116.0100      11.5       158       136        60
OIR    2025250     91400   19.8900 -116.0200      11.6       158       136        60
OIR    2025250     91400   19.8900 -116.0300      11.7       158       139        60
OIR    2025250     91400   19.8900 -116.0400      11.7       158       141        60
OIR    2025250     91400   19.8900 -116.1000      12.1       172       140        60
OIR    2025250     91400   19.8900 -116.1100      12.2       176       142        60
OIR    2025250     91400   19.8900 -116.1400      12.2       176       139        60
OIR    2025250     91400   19.8900 -116.1500      12.2       176       136        60
OIR    2025250     91400   19.8900 -116.1600      12.2       176       135        60
OIR    2025250     91400   19.8900 -116.1700      12.2       176       136        60
OIR    2025250     91400   19.8900 -116.1800      12.2       176       141        60
OIR    2025250     91400   19.8900 -116.2100      12.3       177       141        60
OIR    2025250     91400   19.8900 -118.1900       4.4        52       142        60
OIR    2025250     91400   19.8900 -118.2000       4.4        53       142        60
OIR    2025250     91400   19.8800 -112.1900       4.2       107       140        60
OIR    2025250     91400   19.8800 -112.2000       4.8       107       139        60
OIR    2025250     91400   19.8800 -112.2100       5.3       108       138        60
OIR    2025250     91400   19.8800 -112.2200       5.7       109       139        60
OIR    2025250     91400   19.8800 -112.2300       6.2       110       140        60
OIR    2025250     91400   19.8800 -112.3000       7.6       112       140        60
OIR    2025250     91400   19.8800 -112.3100       7.7       112       140        60
OIR    2025250     91400   19.8800 -112.3200       7.9       111       140        60
OIR    2025250     91400   19.8800 -112.3300       8.2       110       140        60
OIR    2025250     91400   19.8800 -112.3400       8.4       109       140        60
OIR    2025250     91400   19.8800 -112.3500       8.8       106       140        60
OIR    2025250     91400   19.8800 -112.7800      10.6       122       138        60
OIR    2025250     91400   19.8800 -112.7900      10.8       124       136        60
OIR    2025250     91400   19.8800 -112.8000      11.0       125       135        60
OIR    2025250     91400   19.8800 -112.8100      11.2       126       134        60
OIR    2025250     91400   19.8800 -112.8200      11.2       126       134        60
OIR    2025250     91400   19.8800 -112.8300      11.3       126       133        60
OIR    2025250     91400   19.8800 -112.8400      11.3       127       132        60
OIR    2025250     91400   19.8800 -112.8500      11.3       127       132        60
OIR    2025250     91400   19.8800 -112.8600      11.3       127       132        60
OIR    2025250     91400   19.8800 -112.8700      11.2       128       132        60
OIR    2025250     91400   19.8800 -112.8800      11.1       128       132        60
OIR    2025250     91400   19.8800 -112.8900      11.0       129       132        60
OIR    2025250     91400   19.8800 -112.9000      10.8       130       132        60
OIR    2025250     91400   19.8800 -112.9100      10.5       132       132        60
OIR    2025250     91400   19.8800 -112.9200      10.1       134       132        60
OIR    2025250     91400   19.8800 -112.9300       9.8       135       132        60
OIR    2025250     91400   19.8800 -112.9400       9.7       137       132        60
OIR    2025250     91400   19.8800 -112.9500       9.6       138       132        60
OIR    2025250     91400   19.8800 -112.9600       9.5       140       132        60
OIR    2025250     91400   19.8800 -112.9700       9.3       141       132        60
OIR    2025250     91400   19.8800 -112.9800       9.2       143       131        60
OIR    2025250     91400   19.8800 -112.9900       9.0       145       131        60
OIR    2025250     91400   19.8800 -113.0000       8.8       147       131        60
OIR    2025250     91400   19.8800 -113.0100       8.6       150       131        60
OIR    2025250     91400   19.8800 -113.0200       8.4       153       131        60
OIR    2025250     91400   19.8800 -113.0300       8.3       156       130        60
OIR    2025250     91400   19.8800 -113.0400       8.1       158       128        60
OIR    2025250     91400   19.8800 -113.0500       8.1       160       127        60
OIR    2025250     91400   19.8800 -113.0600       8.0       162       127        60
OIR    2025250     91400   19.8800 -113.0700       8.0       163       129        60
OIR    2025250     91400   19.8800 -113.0800       7.9       164       129        60
OIR    2025250     91400   19.8800 -113.0900       7.8       165       129        60
OIR    2025250     91400   19.8800 -113.1000       7.8       165       128        60
OIR    2025250     91400   19.8800 -113.1100       7.8       165       128        60
OIR    2025250     91400   19.8800 -113.1200       7.8       165       127        60
OIR    2025250     91400   19.8800 -113.1300       7.8       166       124        60
OIR    2025250     91400   19.8800 -113.1400       7.8       166       121        60
OIR    2025250     91400   19.8800 -113.1500       7.8       166       120        60
OIR    2025250     91400   19.8800 -113.1600       7.9       166       121        60
OIR    2025250     91400   19.8800 -113.1700       7.9       166       122        60
OIR    2025250     91400   19.8800 -113.1800       7.9       166       121        60
OIR    2025250     91400   19.8800 -113.1900       7.9       166       119        60
OIR    2025250     91400   19.8800 -113.2000       7.9       166       119        60
OIR    2025250     91400   19.8800 -113.2100       7.9       166       117        60
OIR    2025250     91400   19.8800 -113.2200       8.0       166       117        60
OIR    2025250     91400   19.8800 -113.2300       8.0       166       117        60
OIR    2025250     91400   19.8800 -113.2400       8.0       166       117        60
OIR    2025250     91400   19.8800 -113.2500       8.0       166       116        60
OIR    2025250     91400   19.8800 -113.2600       8.0       166       113        60
OIR    2025250     91400   19.8800 -113.2700       8.1       166       114        60
OIR    2025250     91400   19.8800 -113.2800       8.1       166       115        60
OIR    2025250     91400   19.8800 -113.2900       8.1       166       115        60
OIR    2025250     91400   19.8800 -113.3000       8.1       166       116        60
OIR    2025250     91400   19.8800 -113.3100       8.1       166       116        60
OIR    2025250     91400   19.8800 -113.3200       8.2       166       116        60
OIR    2025250     91400   19.8800 -113.3300       8.2       166       116        60
OIR    2025250     91400   19.8800 -113.3400       8.2       166       116        60
OIR    2025250     91400   19.8800 -113.3500       8.2       166       116        60
OIR    2025250     91400   19.8800 -113.3600       8.3       166       115        60
OIR    2025250     91400   19.8800 -113.3700       8.3       166       114        60
OIR    2025250     91400   19.8800 -113.3800       8.3       167       113        60
OIR    2025250     91400   19.8800 -113.3900       8.3       167       113        60
OIR    2025250     91400   19.8800 -113.4000       8.3       167       112        60
OIR    2025250     91400   19.8800 -113.4100       8.4       167       112        60
OIR    2025250     91400   19.8800 -113.4200       8.4       167       112        60
OIR    2025250     91400   19.8800 -113.4300       8.4       167       111        60
OIR    2025250     91400   19.8800 -113.4400       8.4       167       110        60
OIR    2025250     91400   19.8800 -113.4500       8.5       167       110        60
OIR    2025250     91400   19.8800 -113.4600       8.5       167       110        60
OIR    2025250     91400   19.8800 -113.4700       8.5       167       109        60
OIR    2025250     91400   19.8800 -113.4800       8.5       167       108        60
OIR    2025250     91400   19.8800 -113.4900       8.5       167       105        60
OIR    2025250     91400   19.8800 -113.5000       8.5       167       105        60
OIR    2025250     91400   19.8800 -113.5100       8.5       167       105        60
OIR    2025250     91400   19.8800 -113.5200       8.5       167       105        60
OIR    2025250     91400   19.8800 -113.5300       8.5       167       105        60
OIR    2025250     91400   19.8800 -113.5400       8.5       167       107        60
OIR    2025250     91400   19.8800 -113.5500       8.5       167       105        60
OIR    2025250     91400   19.8800 -113.5600       8.5       167       104        60
OIR    2025250     91400   19.8800 -113.5700       8.5       167       104        60
OIR    2025250     91400   19.8800 -113.5800       8.5       167       104        60
OIR    2025250     91400   19.8800 -113.5900       8.5       167       103        60
OIR    2025250     91400   19.8800 -113.6000       8.5       167       103        60
OIR    2025250     91400   19.8800 -113.6100       8.5       166       103        60
OIR    2025250     91400   19.8800 -113.6200       8.6       166       103        60
OIR    2025250     91400   19.8800 -113.6300       8.6       166       103        60
OIR    2025250     91400   19.8800 -113.6400       8.7       166       103        60
OIR    2025250     91400   19.8800 -113.6500       8.8       166       103        60
OIR    2025250     91400   19.8800 -113.6600       8.9       167       104        60
OIR    2025250     91400   19.8800 -113.6700       8.9       167       104        60
OIR    2025250     91400   19.8800 -113.6800       9.0       167       104        60
OIR    2025250     91400   19.8800 -113.6900       9.0       168       105        60
OIR    2025250     91400   19.8800 -113.7000       9.1       168       105        60
OIR    2025250     91400   19.8800 -113.7100       9.1       169       107        60
OIR    2025250     91400   19.8800 -113.7200       9.1       170       107        60
OIR    2025250     91400   19.8800 -113.7300       9.1       170       108        60
OIR    2025250     91400   19.8800 -113.7400       9.1       171       108        60
OIR    2025250     91400   19.8800 -113.7500       9.1       171       109        60
OIR    2025250     91400   19.8800 -113.7600       9.1       172       108        60
OIR    2025250     91400   19.8800 -113.7700       9.2       172       107        60
OIR    2025250     91400   19.8800 -113.7800       9.2       172       105        60
OIR    2025250     91400   19.8800 -113.7900       9.2       172       104        60
OIR    2025250     91400   19.8800 -113.8000       9.2       172       105        60
OIR    2025250     91400   19.8800 -113.8100       9.2       173       105        60
OIR    2025250     91400   19.8800 -113.8200       9.2       173       107        60
OIR    2025250     91400   19.8800 -113.8300       9.2       173       107        60
OIR    2025250     91400   19.8800 -113.8400       9.3       173       105        60
OIR    2025250     91400   19.8800 -113.8500       9.3       174       105        60
OIR    2025250     91400   19.8800 -113.8600       9.3       174       105        60
OIR    2025250     91400   19.8800 -113.8700       9.3       174       105        60
OIR    2025250     91400   19.8800 -113.8800       9.4       174       107        60
OIR    2025250     91400   19.8800 -113.8900       9.4       175       107        60
OIR    2025250     91400   19.8800 -113.9000       9.4       175       107        60
OIR    2025250     91400   19.8800 -113.9100       9.4       175       105        60
OIR    2025250     91400   19.8800 -113.9200       9.4       175       105        60
OIR    2025250     91400   19.8800 -113.9300       9.4       176       104        60
OIR    2025250     91400   19.8800 -113.9400       9.4       176       104        60
OIR    2025250     91400   19.8800 -113.9500       9.4       177       104        60
OIR    2025250     91400   19.8800 -113.9600       9.4       177       104        60
OIR    2025250     91400   19.8800 -113.9700       9.4       177       104        60
OIR    2025250     91400   19.8800 -113.9800       9.4       178       105        60
OIR    2025250     91400   19.8800 -113.9900       9.4       178       104        60
OIR    2025250     91400   19.8800 -114.0000       9.4       178       104        60
OIR    2025250     91400   19.8800 -114.0100       9.4       178       105        60
OIR    2025250     91400   19.8800 -114.0200       9.4       179       105        60
OIR    2025250     91400   19.8800 -114.0300       9.4       179       107        60
OIR    2025250     91400   19.8800 -114.0400       9.4       179       107        60
OIR    2025250     91400   19.8800 -114.0500       9.4       179       107        60
OIR    2025250     91400   19.8800 -114.0600       9.5       180       108        60
OIR    2025250     91400   19.8800 -114.0700       9.4       182       110        60
OIR    2025250     91400   19.8800 -114.0800       9.5       183       111        60
OIR    2025250     91400   19.8800 -114.0900       9.5       185       112        60
OIR    2025250     91400   19.8800 -114.1000       9.5       186       113        60
OIR    2025250     91400   19.8800 -114.1100       9.6       187       115        60
OIR    2025250     91400   19.8800 -114.1200       9.6       188       115        60
OIR    2025250     91400   19.8800 -114.1300       9.6       188       115        60
OIR    2025250     91400   19.8800 -114.1400       9.6       189       114        60
OIR    2025250     91400   19.8800 -114.1500       9.6       190       114        60
OIR    2025250     91400   19.8800 -114.1600       9.5       192       114        60
OIR    2025250     91400   19.8800 -114.1700       9.5       194       114        60
OIR    2025250     91400   19.8800 -114.1800       9.6       201       114        60
OIR    2025250     91400   19.8800 -114.1900       9.6       207       114        60
OIR    2025250     91400   19.8800 -114.2000       9.5       209       115        60
OIR    2025250     91400   19.8800 -114.2100       9.4       211       115        60
OIR    2025250     91400   19.8800 -114.2200       9.3       212       116        60
OIR    2025250     91400   19.8800 -114.2300       9.2       213       116        60
OIR    2025250     91400   19.8800 -114.2400       9.1       214       119        60
OIR    2025250     91400   19.8800 -114.2500       9.0       215       121        60
OIR    2025250     91400   19.8800 -114.2600       9.0       215       123        60
OIR    2025250     91400   19.8800 -114.2700       9.0       216       125        60
OIR    2025250     91400   19.8800 -114.2800       9.0       216       126        60
OIR    2025250     91400   19.8800 -114.2900       8.9       217       128        60
OIR    2025250     91400   19.8800 -114.3000       8.9       217       128        60
OIR    2025250     91400   19.8800 -114.3100       8.9       218       127        60
OIR    2025250     91400   19.8800 -114.3200       8.8       218       126        60
OIR    2025250     91400   19.8800 -114.3300       8.8       218       125        60
OIR    2025250     91400   19.8800 -114.3400       8.8       218       125        60
OIR    2025250     91400   19.8800 -114.3500       8.8       218       124        60
OIR    2025250     91400   19.8800 -114.3600       8.8       218       125        60
OIR    2025250     91400   19.8800 -114.3700       8.7       218       126        60
OIR    2025250     91400   19.8800 -114.3800       8.7       218       127        60
OIR    2025250     91400   19.8800 -114.3900       8.7       218       129        60
OIR    2025250     91400   19.8800 -114.4000       8.7       218       128        60
OIR    2025250     91400   19.8800 -114.4100       8.6       218       127        60
OIR    2025250     91400   19.8800 -114.4200       8.6       218       127        60
OIR    2025250     91400   19.8800 -114.4300       8.5       219       127        60
OIR    2025250     91400   19.8800 -114.4400       8.5       219       128        60
OIR    2025250     91400   19.8800 -114.4500       8.4       219       129        60
OIR    2025250     91400   19.8800 -114.4600       8.3       219       130        60
OIR    2025250     91400   19.8800 -114.4700       8.2       220       131        60
OIR    2025250     91400   19.8800 -114.4800       8.1       220       132        60
OIR    2025250     91400   19.8800 -114.4900       7.8       221       135        60
OIR    2025250     91400   19.8800 -114.5000       7.3       222       139        60
OIR    2025250     91400   19.8800 -114.5100       6.7       222       140        60
OIR    2025250     91400   19.8800 -115.9700      10.6       158       142        60
OIR    2025250     91400   19.8800 -115.9800      10.7       159       141        60
OIR    2025250     91400   19.8800 -115.9900      10.8       159       139        60
OIR    2025250     91400   19.8800 -116.0000      11.0       159       138        60
OIR    2025250     91400   19.8800 -116.0100      11.3       159       137        60
OIR    2025250     91400   19.8800 -116.0200      11.6       159       137        60
OIR    2025250     91400   19.8800 -116.0300      11.7       159       138        60
OIR    2025250     91400   19.8800 -116.0400      11.8       160       141        60
OIR    2025250     91400   19.8800 -116.1000      12.1       173       141        60
OIR    2025250     91400   19.8800 -116.1100      12.2       176       140        60
OIR    2025250     91400   19.8800 -116.1200      12.2       176       140        60
OIR    2025250     91400   19.8800 -116.1300      12.2       176       140        60
OIR    2025250     91400   19.8800 -116.1400      12.2       176       139        60
OIR    2025250     91400   19.8800 -116.1500      12.2       176       138        60
OIR    2025250     91400   19.8800 -116.1600      12.2       176       139        60
OIR    2025250     91400   19.8800 -116.1700      12.3       176       139        60
OIR    2025250     91400   19.8800 -116.1800      12.3       176       141        60
OIR    2025250     91400   19.8800 -118.0200       4.2        22       138        60
OIR    2025250     91400   19.8800 -118.0300       4.4        24       142        60
OIR    2025250     91400   19.8800 -118.1800       4.4        53       142        60
OIR    2025250     91400   19.8800 -118.1900       4.4        53       140        60
OIR    2025250     91400   19.8800 -118.2000       4.4        55       139        60
OIR    2025250     91400   19.8800 -118.2100       4.4        56       141        60
OIR    2025250     91400   19.8700 -112.2100       5.5       109       139        60
OIR    2025250     91400   19.8700 -112.2200       5.9       110       140        60
OIR    2025250     91400   19.8700 -112.7800      10.8       124       136        60
OIR    2025250     91400   19.8700 -112.7900      11.0       126       135        60
OIR    2025250     91400   19.8700 -112.8000      11.1       126       133        60
OIR    2025250     91400   19.8700 -112.8100      11.2       126       133        60
OIR    2025250     91400   19.8700 -112.8200      11.2       126       133        60
OIR    2025250     91400   19.8700 -112.8300      11.2       127       133        60
OIR    2025250     91400   19.8700 -112.8400      11.3       127       132        60
OIR    2025250     91400   19.8700 -112.8500      11.3       127       132        60
OIR    2025250     91400   19.8700 -112.8600      11.2       128       131        60
OIR    2025250     91400   19.8700 -112.8700      11.2       128       131        60
OIR    2025250     91400   19.8700 -112.8800      11.1       129       131        60
OIR    2025250     91400   19.8700 -112.8900      10.9       130       131        60
OIR    2025250     91400   19.8700 -112.9000      10.7       131       131        60
OIR    2025250     91400   19.8700 -112.9100      10.4       133       131        60
OIR    2025250     91400   19.8700 -112.9200      10.1       135       131        60
OIR    2025250     91400   19.8700 -112.9300       9.8       137       131        60
OIR    2025250     91400   19.8700 -112.9400       9.6       138       131        60
OIR    2025250     91400   19.8700 -112.9500       9.5       140       131        60
OIR    2025250     91400   19.8700 -112.9600       9.4       141       131        60
OIR    2025250     91400   19.8700 -112.9700       9.2       143       131        60
OIR    2025250     91400   19.8700 -112.9800       9.1       145       131        60
OIR    2025250     91400   19.8700 -112.9900       8.9       147       131        60
OIR    2025250     91400   19.8700 -113.0000       8.6       151       130        60
OIR    2025250     91400   19.8700 -113.0100       8.3       154       130        60
OIR    2025250     91400   19.8700 -113.0200       8.2       156       130        60
OIR    2025250     91400   19.8700 -113.0300       8.1       159       130        60
OIR    2025250     91400   19.8700 -113.0400       8.0       161       129        60
OIR    2025250     91400   19.8700 -113.0500       8.0       162       128        60
OIR    2025250     91400   19.8700 -113.0600       7.9       163       128        60
OIR    2025250     91400   19.8700 -113.0700       7.9       164       128        60
OIR    2025250     91400   19.8700 -113.0800       7.8       165       128        60
OIR    2025250     91400   19.8700 -113.0900       7.8       166       127        60
OIR    2025250     91400   19.8700 -113.1000       7.8       166       125        60
OIR    2025250     91400   19.8700 -113.1100       7.8       166       126        60
OIR    2025250     91400   19.8700 -113.1200       7.8       166       127        60
OIR    2025250     91400   19.8700 -113.1300       7.8       166       125        60
OIR    2025250     91400   19.8700 -113.1400       7.8       166       122        60
OIR    2025250     91400   19.8700 -113.1500       7.8       166       120        60
OIR    2025250     91400   19.8700 -113.1600       7.9       166       119        60
OIR    2025250     91400   19.8700 -113.1700       7.9       166       119        60
OIR    2025250     91400   19.8700 -113.1800       7.9       166       119        60
OIR    2025250     91400   19.8700 -113.1900       7.9       166       119        60
OIR    2025250     91400   19.8700 -113.2000       7.9       166       117        60
OIR    2025250     91400   19.8700 -113.2100       7.9       166       117        60
OIR    2025250     91400   19.8700 -113.2200       7.9       166       117        60
OIR    2025250     91400   19.8700 -113.2300       8.0       166       116        60
OIR    2025250     91400   19.8700 -113.2400       8.0       166       116        60
OIR    2025250     91400   19.8700 -113.2500       8.0       166       115        60
OIR    2025250     91400   19.8700 -113.2600       8.0       166       114        60
OIR    2025250     91400   19.8700 -113.2700       8.0       166       114        60
OIR    2025250     91400   19.8700 -113.2800       8.1       166       114        60
OIR    2025250     91400   19.8700 -113.2900       8.1       166       115        60
OIR    2025250     91400   19.8700 -113.3000       8.1       166       116        60
OIR    2025250     91400   19.8700 -113.3100       8.1       166       116        60
OIR    2025250     91400   19.8700 -113.3200       8.2       166       116        60
OIR    2025250     91400   19.8700 -113.3300       8.2       166       116        60
OIR    2025250     91400   19.8700 -113.3400       8.2       166       116        60
OIR    2025250     91400   19.8700 -113.3500       8.2       166       116        60
OIR    2025250     91400   19.8700 -113.3600       8.2       167       115        60
OIR    2025250     91400   19.8700 -113.3700       8.3       167       113        60
OIR    2025250     91400   19.8700 -113.3800       8.3       167       111        60
OIR    2025250     91400   19.8700 -113.3900       8.3       167       112        60
OIR    2025250     91400   19.8700 -113.4000       8.3       167       112        60
OIR    2025250     91400   19.8700 -113.4100       8.3       167       111        60
OIR    2025250     91400   19.8700 -113.4200       8.4       167       111        60
OIR    2025250     91400   19.8700 -113.4300       8.4       167       111        60
OIR    2025250     91400   19.8700 -113.4400       8.4       167       110        60
OIR    2025250     91400   19.8700 -113.4500       8.4       167       110        60
OIR    2025250     91400   19.8700 -113.4600       8.5       167       109        60
OIR    2025250     91400   19.8700 -113.4700       8.5       167       108        60
OIR    2025250     91400   19.8700 -113.4800       8.5       167       107        60
OIR    2025250     91400   19.8700 -113.4900       8.5       167       105        60
OIR    2025250     91400   19.8700 -113.5000       8.5       167       104        60
OIR    2025250     91400   19.8700 -113.5100       8.5       167       104        60
OIR    2025250     91400   19.8700 -113.5200       8.5       167       104        60
OIR    2025250     91400   19.8700 -113.5300       8.5       167       104        60
OIR    2025250     91400   19.8700 -113.5400       8.5       167       105        60
OIR    2025250     91400   19.8700 -113.5500       8.5       167       105        60
OIR    2025250     91400   19.8700 -113.5600       8.5       167       104        60
OIR    2025250     91400   19.8700 -113.5700       8.5       167       104        60
OIR    2025250     91400   19.8700 -113.5800       8.5       167       104        60
OIR    2025250     91400   19.8700 -113.5900       8.5       167       104        60
OIR    2025250     91400   19.8700 -113.6000       8.5       167       104        60
OIR    2025250     91400   19.8700 -113.6100       8.5       167       104        60
OIR    2025250     91400   19.8700 -113.6200       8.6       166       103        60
OIR    2025250     91400   19.8700 -113.6300       8.6       166       103        60
OIR    2025250     91400   19.8700 -113.6400       8.7       166       103        60
OIR    2025250     91400   19.8700 -113.6500       8.8       167       104        60
OIR    2025250     91400   19.8700 -113.6600       8.8       167       104        60
OIR    2025250     91400   19.8700 -113.6700       8.9       167       105        60
OIR    2025250     91400   19.8700 -113.6800       8.9       168       105        60
OIR    2025250     91400   19.8700 -113.6900       9.0       168       105        60
OIR    2025250     91400   19.8700 -113.7000       9.0       169       105        60
OIR    2025250     91400   19.8700 -113.7100       9.0       169       107        60
OIR    2025250     91400   19.8700 -113.7200       9.1       170       107        60
OIR    2025250     91400   19.8700 -113.7300       9.1       171       107        60
OIR    2025250     91400   19.8700 -113.7400       9.1       171       108        60
OIR    2025250     91400   19.8700 -113.7500       9.1       172       108        60
OIR    2025250     91400   19.8700 -113.7600       9.1       172       108        60
OIR    2025250     91400   19.8700 -113.7700       9.1       172       107        60
OIR    2025250     91400   19.8700 -113.7800       9.1       172       105        60
OIR    2025250     91400   19.8700 -113.7900       9.1       173       104        60
OIR    2025250     91400   19.8700 -113.8000       9.1       173       104        60
OIR    2025250     91400   19.8700 -113.8100       9.2       173       104        60
OIR    2025250     91400   19.8700 -113.8200       9.2       173       105        60
OIR    2025250     91400   19.8700 -113.8300       9.2       174       105        60
OIR    2025250     91400   19.8700 -113.8400       9.2       174       105        60
OIR    2025250     91400   19.8700 -113.8500       9.2       174       105        60
OIR    2025250     91400   19.8700 -113.8600       9.3       175       105        60
OIR    2025250     91400   19.8700 -113.8700       9.3       175       105        60
OIR    2025250     91400   19.8700 -113.8800       9.3       175       107        60
OIR    2025250     91400   19.8700 -113.8900       9.3       175       107        60
OIR    2025250     91400   19.8700 -113.9000       9.4       175       105        60
OIR    2025250     91400   19.8700 -113.9100       9.4       176       105        60
OIR    2025250     91400   19.8700 -113.9200       9.4       176       105        60
OIR    2025250     91400   19.8700 -113.9300       9.4       176       104        60
OIR    2025250     91400   19.8700 -113.9400       9.4       177       104        60
OIR    2025250     91400   19.8700 -113.9500       9.4       177       104        60
OIR    2025250     91400   19.8700 -113.9600       9.4       177       104        60
OIR    2025250     91400   19.8700 -113.9700       9.4       177       104        60
OIR    2025250     91400   19.8700 -113.9800       9.4       178       104        60
OIR    2025250     91400   19.8700 -113.9900       9.4       178       104        60
OIR    2025250     91400   19.8700 -114.0000       9.4       178       104        60
OIR    2025250     91400   19.8700 -114.0100       9.4       178       105        60
OIR    2025250     91400   19.8700 -114.0200       9.4       178       105        60
OIR    2025250     91400   19.8700 -114.0300       9.4       179       107        60
OIR    2025250     91400   19.8700 -114.0400       9.4       179       107        60
OIR    2025250     91400   19.8700 -114.0500       9.4       179       108        60
OIR    2025250     91400   19.8700 -114.0600       9.4       180       109        60
OIR    2025250     91400   19.8700 -114.0700       9.4       182       110        60
OIR    2025250     91400   19.8700 -114.0800       9.4       184       111        60
OIR    2025250     91400   19.8700 -114.0900       9.5       185       112        60
OIR    2025250     91400   19.8700 -114.1000       9.5       186       114        60
OIR    2025250     91400   19.8700 -114.1100       9.5       187       115        60
OIR    2025250     91400   19.8700 -114.1200       9.5       188       116        60
OIR    2025250     91400   19.8700 -114.1300       9.6       188       115        60
OIR    2025250     91400   19.8700 -114.1400       9.5       189       115        60
OIR    2025250     91400   19.8700 -114.1500       9.5       190       115        60
OIR    2025250     91400   19.8700 -114.1600       9.5       192       115        60
OIR    2025250     91400   19.8700 -114.1700       9.4       195       114        60
OIR    2025250     91400   19.8700 -114.1800       9.5       199       113        60
OIR    2025250     91400   19.8700 -114.1900       9.5       205       114        60
OIR    2025250     91400   19.8700 -114.2000       9.5       208       114        60
OIR    2025250     91400   19.8700 -114.2100       9.4       210       115        60
OIR    2025250     91400   19.8700 -114.2200       9.3       212       116        60
OIR    2025250     91400   19.8700 -114.2300       9.1       213       116        60
OIR    2025250     91400   19.8700 -114.2400       9.1       215       119        60
OIR    2025250     91400   19.8700 -114.2500       9.0       215       120        60
OIR    2025250     91400   19.8700 -114.2600       9.0       216       122        60
OIR    2025250     91400   19.8700 -114.2700       9.0       216       124        60
OIR    2025250     91400   19.8700 -114.2800       8.9       216       125        60
OIR    2025250     91400   19.8700 -114.2900       8.9       217       126        60
OIR    2025250     91400   19.8700 -114.3000       8.9       217       127        60
OIR    2025250     91400   19.8700 -114.3100       8.9       218       127        60
OIR    2025250     91400   19.8700 -114.3200       8.8       218       127        60
OIR    2025250     91400   19.8700 -114.3300       8.8       218       126        60
OIR    2025250     91400   19.8700 -114.3400       8.8       218       126        60
OIR    2025250     91400   19.8700 -114.3500       8.8       218       125        60
OIR    2025250     91400   19.8700 -114.3600       8.8       218       125        60
OIR    2025250     91400   19.8700 -114.3700       8.7       218       125        60
OIR    2025250     91400   19.8700 -114.3800       8.7       218       126        60
OIR    2025250     91400   19.8700 -114.3900       8.7       218       127        60
OIR    2025250     91400   19.8700 -114.4000       8.7       218       126        60
OIR    2025250     91400   19.8700 -114.4100       8.6       218       126        60
OIR    2025250     91400   19.8700 -114.4200       8.6       218       126        60
OIR    2025250     91400   19.8700 -114.4300       8.5       219       126        60
OIR    2025250     91400   19.8700 -114.4400       8.5       219       127        60
OIR    2025250     91400   19.8700 -114.4500       8.5       219       127        60
OIR    2025250     91400   19.8700 -114.4600       8.3       219       128        60
OIR    2025250     91400   19.8700 -114.4700       8.2       220       129        60
OIR    2025250     91400   19.8700 -114.4800       7.9       220       129        60
OIR    2025250     91400   19.8700 -114.4900       7.3       221       131        60
OIR    2025250     91400   19.8700 -114.5000       6.4       222       133        60
OIR    2025250     91400   19.8700 -114.5100       5.3       224       135        60
OIR    2025250     91400   19.8700 -114.5200       4.3       226       135        60
OIR    2025250     91400   19.8700 -115.9300       9.6       156       142        60
OIR    2025250     91400   19.8700 -115.9700      10.4       159       141        60
OIR    2025250     91400   19.8700 -115.9800      10.6       159       140        60
OIR    2025250     91400   19.8700 -115.9900      10.7       160       139        60
OIR    2025250     91400   19.8700 -116.0000      10.9       160       138        60
OIR    2025250     91400   19.8700 -116.0100      11.1       161       137        60
OIR    2025250     91400   19.8700 -116.0200      11.4       162       137        60
OIR    2025250     91400   19.8700 -116.0300      11.7       163       138        60
OIR    2025250     91400   19.8700 -116.0400      11.8       163       141        60
OIR    2025250     91400   19.8700 -116.1000      12.1       173       141        60
OIR    2025250     91400   19.8700 -116.1100      12.2       176       139        60
OIR    2025250     91400   19.8700 -116.1200      12.2       176       138        60
OIR    2025250     91400   19.8700 -116.1300      12.2       176       138        60
OIR    2025250     91400   19.8700 -116.1400      12.2       176       139        60
OIR    2025250     91400   19.8700 -116.1500      12.3       176       140        60
OIR    2025250     91400   19.8700 -116.1600      12.3       176       141        60
OIR    2025250     91400   19.8700 -118.0200       4.0        24       138        60
OIR    2025250     91400   19.8700 -118.0300       4.2        26       139        60
OIR    2025250     91400   19.8700 -118.1700       4.3        53       142        60
OIR    2025250     91400   19.8700 -118.1800       4.3        54       140        60
OIR    2025250     91400   19.8700 -118.1900       4.4        56       139        60
OIR    2025250     91400   19.8700 -118.2000       4.3        58       137        60
OIR    2025250     91400   19.8700 -118.2100       4.3        59       138        60
OIR    2025250     91400   19.8700 -118.2200       4.3        60       140        60
OIR    2025250     91400   19.8700 -118.2300       4.4        61       141        60
OIR    2025250     91400   19.8700 -118.2400       4.4        63       142        60
OIR    2025250     91400   19.8600 -112.7800      11.0       126       137        60
OIR    2025250     91400   19.8600 -112.7900      11.0       126       136        60
OIR    2025250     91400   19.8600 -112.8000      11.1       126       135        60
OIR    2025250     91400   19.8600 -112.8100      11.1       126       134        60
OIR    2025250     91400   19.8600 -112.8200      11.2       127       133        60
OIR    2025250     91400   19.8600 -112.8300      11.2       127       131        60
OIR    2025250     91400   19.8600 -112.8400      11.2       127       129        60
OIR    2025250     91400   19.8600 -112.8500      11.3       128       128        60
OIR    2025250     91400   19.8600 -112.8600      11.2       128       128        60
OIR    2025250     91400   19.8600 -112.8700      11.2       129       129        60
OIR    2025250     91400   19.8600 -112.8800      11.1       130       130        60
OIR    2025250     91400   19.8600 -112.8900      10.9       131       130        60
OIR    2025250     91400   19.8600 -112.9000      10.6       133       130        60
OIR    2025250     91400   19.8600 -112.9100      10.3       134       130        60
OIR    2025250     91400   19.8600 -112.9200       9.9       136       130        60
OIR    2025250     91400   19.8600 -112.9300       9.7       138       130        60
OIR    2025250     91400   19.8600 -112.9400       9.5       139       130        60
OIR    2025250     91400   19.8600 -112.9500       9.4       141       130        60
OIR    2025250     91400   19.8600 -112.9600       9.2       143       131        60
OIR    2025250     91400   19.8600 -112.9700       9.1       145       131        60
OIR    2025250     91400   19.8600 -112.9800       8.9       148       131        60
OIR    2025250     91400   19.8600 -112.9900       8.6       151       131        60
OIR    2025250     91400   19.8600 -113.0000       8.3       155       130        60
OIR    2025250     91400   19.8600 -113.0100       8.1       158       128        60
OIR    2025250     91400   19.8600 -113.0200       8.0       160       129        60
OIR    2025250     91400   19.8600 -113.0300       8.0       162       130        60
OIR    2025250     91400   19.8600 -113.0400       7.9       163       129        60
OIR    2025250     91400   19.8600 -113.0500       7.9       164       128        60
OIR    2025250     91400   19.8600 -113.0600       7.8       165       128        60
OIR    2025250     91400   19.8600 -113.0700       7.8       165       128        60
OIR    2025250     91400   19.8600 -113.0800       7.8       166       127        60
OIR    2025250     91400   19.8600 -113.0900       7.8       166       125        60
OIR    2025250     91400   19.8600 -113.1000       7.8       166       123        60
OIR    2025250     91400   19.8600 -113.1100       7.8       166       124        60
OIR    2025250     91400   19.8600 -113.1200       7.8       166       125        60
OIR    2025250     91400   19.8600 -113.1300       7.8       166       125        60
OIR    2025250     91400   19.8600 -113.1400       7.8       166       122        60
OIR    2025250     91400   19.8600 -113.1500       7.8       166       120        60
OIR    2025250     91400   19.8600 -113.1600       7.9       166       117        60
OIR    2025250     91400   19.8600 -113.1700       7.9       166       115        60
OIR    2025250     91400   19.8600 -113.1800       7.9       166       116        60
OIR    2025250     91400   19.8600 -113.1900       7.9       166       117        60
OIR    2025250     91400   19.8600 -113.2000       7.9       166       119        60
OIR    2025250     91400   19.8600 -113.2100       7.9       166       119        60
OIR    2025250     91400   19.8600 -113.2200       7.9       166       117        60
OIR    2025250     91400   19.8600 -113.2300       7.9       166       116        60
OIR    2025250     91400   19.8600 -113.2400       8.0       166       115        60
OIR    2025250     91400   19.8600 -113.2500       8.0       166       114        60
OIR    2025250     91400   19.8600 -113.2600       8.0       166       113        60
OIR    2025250     91400   19.8600 -113.2700       8.0       166       113        60
OIR    2025250     91400   19.8600 -113.2800       8.1       166       114        60
OIR    2025250     91400   19.8600 -113.2900       8.1       166       114        60
OIR    2025250     91400   19.8600 -113.3000       8.1       166       115        60
OIR    2025250     91400   19.8600 -113.3100       8.1       166       115        60
OIR    2025250     91400   19.8600 -113.3200       8.1       166       115        60
OIR    2025250     91400   19.8600 -113.3300       8.2       166       115        60
OIR    2025250     91400   19.8600 -113.3400       8.2       167       114        60
OIR    2025250     91400   19.8600 -113.3500       8.2       167       113        60
OIR    2025250     91400   19.8600 -113.3600       8.2       167       112        60
OIR    2025250     91400   19.8600 -113.3700       8.3       167       110        60
OIR    2025250     91400   19.8600 -113.3800       8.3       167       109        60
OIR    2025250     91400   19.8600 -113.3900       8.3       167       110        60
OIR    2025250     91400   19.8600 -113.4000       8.3       167       111        60
OIR    2025250     91400   19.8600 -113.4100       8.3       167       110        60
OIR    2025250     91400   19.8600 -113.4200       8.3       167       109        60
OIR    2025250     91400   19.8600 -113.4300       8.4       167       109        60
OIR    2025250     91400   19.8600 -113.4400       8.4       167       108        60
OIR    2025250     91400   19.8600 -113.4500       8.4       167       108        60
OIR    2025250     91400   19.8600 -113.4600       8.4       167       107        60
OIR    2025250     91400   19.8600 -113.4700       8.4       167       105        60
OIR    2025250     91400   19.8600 -113.4800       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.4900       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.5000       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.5100       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.5200       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.5300       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.5400       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.5500       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.5600       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.5700       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.5800       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.5900       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.6000       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.6100       8.5       167       104        60
OIR    2025250     91400   19.8600 -113.6200       8.5       167       103        60
OIR    2025250     91400   19.8600 -113.6300       8.6       167       103        60
OIR    2025250     91400   19.8600 -113.6400       8.7       167       103        60
OIR    2025250     91400   19.8600 -113.6500       8.7       167       104        60
OIR    2025250     91400   19.8600 -113.6600       8.8       167       104        60
OIR    2025250     91400   19.8600 -113.6700       8.8       168       104        60
OIR    2025250     91400   19.8600 -113.6800       8.9       168       105        60
OIR    2025250     91400   19.8600 -113.6900       8.9       169       105        60
OIR    2025250     91400   19.8600 -113.7000       8.9       169       105        60
OIR    2025250     91400   19.8600 -113.7100       9.0       170       107        60
OIR    2025250     91400   19.8600 -113.7200       9.0       170       107        60
OIR    2025250     91400   19.8600 -113.7300       9.0       171       107        60
OIR    2025250     91400   19.8600 -113.7400       9.0       171       108        60
OIR    2025250     91400   19.8600 -113.7500       9.0       172       108        60
OIR    2025250     91400   19.8600 -113.7600       9.1       172       107        60
OIR    2025250     91400   19.8600 -113.7700       9.1       172       107        60
OIR    2025250     91400   19.8600 -113.7800       9.1       173       107        60
OIR    2025250     91400   19.8600 -113.7900       9.1       173       105        60
OIR    2025250     91400   19.8600 -113.8000       9.1       173       104        60
OIR    2025250     91400   19.8600 -113.8100       9.1       173       104        60
OIR    2025250     91400   19.8600 -113.8200       9.1       174       104        60
OIR    2025250     91400   19.8600 -113.8300       9.2       174       104        60
OIR    2025250     91400   19.8600 -113.8400       9.2       174       105        60
OIR    2025250     91400   19.8600 -113.8500       9.2       175       105        60
OIR    2025250     91400   19.8600 -113.8600       9.2       175       105        60
OIR    2025250     91400   19.8600 -113.8700       9.2       175       107        60
OIR    2025250     91400   19.8600 -113.8800       9.3       175       107        60
OIR    2025250     91400   19.8600 -113.8900       9.3       175       107        60
OIR    2025250     91400   19.8600 -113.9000       9.3       176       105        60
OIR    2025250     91400   19.8600 -113.9100       9.3       176       104        60
OIR    2025250     91400   19.8600 -113.9200       9.3       176       104        60
OIR    2025250     91400   19.8600 -113.9300       9.3       176       105        60
OIR    2025250     91400   19.8600 -113.9400       9.3       177       105        60
OIR    2025250     91400   19.8600 -113.9500       9.3       177       104        60
OIR    2025250     91400   19.8600 -113.9600       9.3       177       104        60
OIR    2025250     91400   19.8600 -113.9700       9.3       177       104        60
OIR    2025250     91400   19.8600 -113.9800       9.3       178       104        60
OIR    2025250     91400   19.8600 -113.9900       9.3       178       105        60
OIR    2025250     91400   19.8600 -114.0000       9.3       178       107        60
OIR    2025250     91400   19.8600 -114.0100       9.3       178       107        60
OIR    2025250     91400   19.8600 -114.0200       9.3       178       107        60
OIR    2025250     91400   19.8600 -114.0300       9.4       179       107        60
OIR    2025250     91400   19.8600 -114.0400       9.4       179       108        60
OIR    2025250     91400   19.8600 -114.0500       9.4       179       109        60
OIR    2025250     91400   19.8600 -114.0600       9.4       179       110        60
OIR    2025250     91400   19.8600 -114.0700       9.4       182       111        60
OIR    2025250     91400   19.8600 -114.0800       9.4       184       111        60
OIR    2025250     91400   19.8600 -114.0900       9.4       186       112        60
OIR    2025250     91400   19.8600 -114.1000       9.5       186       113        60
OIR    2025250     91400   19.8600 -114.1100       9.5       187       115        60
OIR    2025250     91400   19.8600 -114.1200       9.5       188       116        60
OIR    2025250     91400   19.8600 -114.1300       9.5       188       116        60
OIR    2025250     91400   19.8600 -114.1400       9.5       189       116        60
OIR    2025250     91400   19.8600 -114.1500       9.4       191       116        60
OIR    2025250     91400   19.8600 -114.1600       9.4       193       115        60
OIR    2025250     91400   19.8600 -114.1700       9.3       195       114        60
OIR    2025250     91400   19.8600 -114.1800       9.3       198       113        60
OIR    2025250     91400   19.8600 -114.1900       9.4       203       113        60
OIR    2025250     91400   19.8600 -114.2000       9.4       207       114        60
OIR    2025250     91400   19.8600 -114.2100       9.4       209       115        60
OIR    2025250     91400   19.8600 -114.2200       9.3       211       116        60
OIR    2025250     91400   19.8600 -114.2300       9.2       212       116        60
OIR    2025250     91400   19.8600 -114.2400       9.1       215       117        60
OIR    2025250     91400   19.8600 -114.2500       9.0       215       120        60
OIR    2025250     91400   19.8600 -114.2600       9.0       216       121        60
OIR    2025250     91400   19.8600 -114.2700       9.0       216       123        60
OIR    2025250     91400   19.8600 -114.2800       8.9       216       124        60
OIR    2025250     91400   19.8600 -114.2900       8.9       217       125        60
OIR    2025250     91400   19.8600 -114.3000       8.9       217       126        60
OIR    2025250     91400   19.8600 -114.3100       8.8       218       126        60
OIR    2025250     91400   19.8600 -114.3200       8.8       218       127        60
OIR    2025250     91400   19.8600 -114.3300       8.8       218       126        60
OIR    2025250     91400   19.8600 -114.3400       8.8       218       126        60
OIR    2025250     91400   19.8600 -114.3500       8.8       218       126        60
OIR    2025250     91400   19.8600 -114.3600       8.7       218       125        60
OIR    2025250     91400   19.8600 -114.3700       8.7       218       124        60
OIR    2025250     91400   19.8600 -114.3800       8.7       218       125        60
OIR    2025250     91400   19.8600 -114.3900       8.7       218       125        60
OIR    2025250     91400   19.8600 -114.4000       8.7       218       125        60
OIR    2025250     91400   19.8600 -114.4100       8.6       218       125        60
OIR    2025250     91400   19.8600 -114.4200       8.6       218       125        60
OIR    2025250     91400   19.8600 -114.4300       8.5       218       126        60
OIR    2025250     91400   19.8600 -114.4400       8.5       219       126        60
OIR    2025250     91400   19.8600 -114.4500       8.5       219       126        60
OIR    2025250     91400   19.8600 -114.4600       8.4       219       126        60
OIR    2025250     91400   19.8600 -114.4700       8.1       219       126        60
OIR    2025250     91400   19.8600 -114.4800       7.5       220       126        60
OIR    2025250     91400   19.8600 -114.4900       6.3       222       127        60
OIR    2025250     91400   19.8600 -114.5000       5.2       224       128        60
OIR    2025250     91400   19.8600 -114.5100       4.6       224       129        60
OIR    2025250     91400   19.8600 -114.5200       4.0       225       130        60
OIR    2025250     91400   19.8600 -115.9300       9.4       157       142        60
OIR    2025250     91400   19.8600 -115.9600      10.2       160       142        60
OIR    2025250     91400   19.8600 -115.9700      10.3       160       141        60
OIR    2025250     91400   19.8600 -115.9800      10.4       160       140        60
OIR    2025250     91400   19.8600 -115.9900      10.6       161       140        60
OIR    2025250     91400   19.8600 -116.0000      10.7       162       139        60
OIR    2025250     91400   19.8600 -116.0100      11.0       163       138        60
OIR    2025250     91400   19.8600 -116.0200      11.3       164       137        60
OIR    2025250     91400   19.8600 -116.0300      11.6       165       138        60
OIR    2025250     91400   19.8600 -116.0400      11.7       165       140        60
OIR    2025250     91400   19.8600 -116.1000      12.2       174       142        60
OIR    2025250     91400   19.8600 -116.1100      12.2       176       138        60
OIR    2025250     91400   19.8600 -116.1200      12.2       176       138        60
OIR    2025250     91400   19.8600 -116.1300      12.2       176       138        60
OIR    2025250     91400   19.8600 -116.1400      12.2       176       140        60
OIR    2025250     91400   19.8600 -116.1500      12.3       176       141        60
OIR    2025250     91400   19.8600 -118.0300       4.1        29       138        60
OIR    2025250     91400   19.8600 -118.0400       4.2        32       138        60
OIR    2025250     91400   19.8600 -118.0500       4.4        37       139        60
OIR    2025250     91400   19.8600 -118.0600       4.5        41       139        60
OIR    2025250     91400   19.8600 -118.0700       4.5        44       139        60
OIR    2025250     91400   19.8600 -118.0800       4.6        45       140        60
OIR    2025250     91400   19.8600 -118.0900       4.6        46       142        60
OIR    2025250     91400   19.8600 -118.1000       4.5        47       142        60
OIR    2025250     91400   19.8600 -118.1100       4.5        48       142        60
OIR    2025250     91400   19.8600 -118.1600       4.3        54       141        60
OIR    2025250     91400   19.8600 -118.1700       4.3        56       140        60
OIR    2025250     91400   19.8600 -118.1800       4.3        58       139        60
OIR    2025250     91400   19.8600 -118.1900       4.3        60       137        60
OIR    2025250     91400   19.8600 -118.2000       4.3        61       135        60
OIR    2025250     91400   19.8600 -118.2100       4.3        61       135        60
OIR    2025250     91400   19.8600 -118.2200       4.3        62       136        60
OIR    2025250     91400   19.8600 -118.2300       4.4        65       138        60
OIR    2025250     91400   19.8600 -118.2400       4.4        67       140        60
OIR    2025250     91400   19.8600 -118.2500       4.3        70       141        60
OIR    2025250     91400   19.8600 -118.2900       4.0        75       140        60
OIR    2025250     91400   19.8500 -112.7800      11.0       126       138        60
OIR    2025250     91400   19.8500 -112.7900      11.0       126       138        60
OIR    2025250     91400   19.8500 -112.8000      11.0       127       138        60
OIR    2025250     91400   19.8500 -112.8100      11.1       127       136        60
OIR    2025250     91400   19.8500 -112.8200      11.2       127       133        60
OIR    2025250     91400   19.8500 -112.8300      11.2       127       131        60
OIR    2025250     91400   19.8500 -112.8400      11.2       128       127        60
OIR    2025250     91400   19.8500 -112.8500      11.3       128       125        60
OIR    2025250     91400   19.8500 -112.8600      11.2       129       125        60
OIR    2025250     91400   19.8500 -112.8700      11.2       130       126        60
OIR    2025250     91400   19.8500 -112.8800      11.0       131       127        60
OIR    2025250     91400   19.8500 -112.8900      10.8       132       129        60
OIR    2025250     91400   19.8500 -112.9000      10.5       134       129        60
OIR    2025250     91400   19.8500 -112.9100      10.2       136       129        60
OIR    2025250     91400   19.8500 -112.9200       9.8       138       129        60
OIR    2025250     91400   19.8500 -112.9300       9.6       139       130        60
OIR    2025250     91400   19.8500 -112.9400       9.4       141       130        60
OIR    2025250     91400   19.8500 -112.9500       9.2       143       130        60
OIR    2025250     91400   19.8500 -112.9600       9.0       146       131        60
OIR    2025250     91400   19.8500 -112.9700       8.8       149       131        60
OIR    2025250     91400   19.8500 -112.9800       8.6       152       131        60
OIR    2025250     91400   19.8500 -112.9900       8.3       156       131        60
OIR    2025250     91400   19.8500 -113.0000       8.1       159       130        60
OIR    2025250     91400   19.8500 -113.0100       8.0       161       128        60
OIR    2025250     91400   19.8500 -113.0200       7.9       163       128        60
OIR    2025250     91400   19.8500 -113.0300       7.9       164       129        60
OIR    2025250     91400   19.8500 -113.0400       7.8       165       128        60
OIR    2025250     91400   19.8500 -113.0500       7.8       165       125        60
OIR    2025250     91400   19.8500 -113.0600       7.8       166       123        60
OIR    2025250     91400   19.8500 -113.0700       7.8       166       123        60
OIR    2025250     91400   19.8500 -113.0800       7.8       166       123        60
OIR    2025250     91400   19.8500 -113.0900       7.8       166       123        60
OIR    2025250     91400   19.8500 -113.1000       7.8       166       123        60
OIR    2025250     91400   19.8500 -113.1100       7.8       166       123        60
OIR    2025250     91400   19.8500 -113.1200       7.8       166       122        60
OIR    2025250     91400   19.8500 -113.1300       7.8       166       121        60
OIR    2025250     91400   19.8500 -113.1400       7.8       166       120        60
OIR    2025250     91400   19.8500 -113.1500       7.8       166       117        60
OIR    2025250     91400   19.8500 -113.1600       7.9       166       116        60
OIR    2025250     91400   19.8500 -113.1700       7.9       166       116        60
OIR    2025250     91400   19.8500 -113.1800       7.9       166       116        60
OIR    2025250     91400   19.8500 -113.1900       7.9       166       116        60
OIR    2025250     91400   19.8500 -113.2000       7.9       166       117        60
OIR    2025250     91400   19.8500 -113.2100       7.9       166       116        60
OIR    2025250     91400   19.8500 -113.2200       7.9       166       116        60
OIR    2025250     91400   19.8500 -113.2300       7.9       166       115        60
OIR    2025250     91400   19.8500 -113.2400       8.0       166       113        60
OIR    2025250     91400   19.8500 -113.2500       8.0       166       113        60
OIR    2025250     91400   19.8500 -113.2600       8.0       166       113        60
OIR    2025250     91400   19.8500 -113.2700       8.0       166       113        60
OIR    2025250     91400   19.8500 -113.2800       8.0       166       113        60
OIR    2025250     91400   19.8500 -113.2900       8.1       166       113        60
OIR    2025250     91400   19.8500 -113.3000       8.1       166       113        60
OIR    2025250     91400   19.8500 -113.3100       8.1       166       113        60
OIR    2025250     91400   19.8500 -113.3200       8.1       167       113        60
OIR    2025250     91400   19.8500 -113.3300       8.2       167       113        60
OIR    2025250     91400   19.8500 -113.3400       8.2       167       113        60
OIR    2025250     91400   19.8500 -113.3500       8.2       167       111        60
OIR    2025250     91400   19.8500 -113.3600       8.2       167       109        60
OIR    2025250     91400   19.8500 -113.3700       8.2       167       108        60
OIR    2025250     91400   19.8500 -113.3800       8.3       167       107        60
OIR    2025250     91400   19.8500 -113.3900       8.3       167       108        60
OIR    2025250     91400   19.8500 -113.4000       8.3       167       109        60
OIR    2025250     91400   19.8500 -113.4100       8.3       167       109        60
OIR    2025250     91400   19.8500 -113.4200       8.3       167       108        60
OIR    2025250     91400   19.8500 -113.4300       8.4       167       107        60
OIR    2025250     91400   19.8500 -113.4400       8.4       167       105        60
OIR    2025250     91400   19.8500 -113.4500       8.4       167       105        60
OIR    2025250     91400   19.8500 -113.4600       8.4       167       104        60
OIR    2025250     91400   19.8500 -113.4700       8.4       167       104        60
OIR    2025250     91400   19.8500 -113.4800       8.4       167       103        60
OIR    2025250     91400   19.8500 -113.4900       8.4       167       103        60
OIR    2025250     91400   19.8500 -113.5000       8.4       167       103        60
OIR    2025250     91400   19.8500 -113.5100       8.4       167       104        60
OIR    2025250     91400   19.8500 -113.5200       8.4       167       104        60
OIR    2025250     91400   19.8500 -113.5300       8.4       167       104        60
OIR    2025250     91400   19.8500 -113.5400       8.4       167       104        60
OIR    2025250     91400   19.8500 -113.5500       8.4       167       104        60
OIR    2025250     91400   19.8500 -113.5600       8.4       167       104        60
OIR    2025250     91400   19.8500 -113.5700       8.4       167       104        60
OIR    2025250     91400   19.8500 -113.5800       8.5       167       104        60
OIR    2025250     91400   19.8500 -113.5900       8.5       167       104        60
OIR    2025250     91400   19.8500 -113.6000       8.5       167       104        60
OIR    2025250     91400   19.8500 -113.6100       8.5       167       103        60
OIR    2025250     91400   19.8500 -113.6200       8.5       167       103        60
OIR    2025250     91400   19.8500 -113.6300       8.6       167       103        60
OIR    2025250     91400   19.8500 -113.6400       8.6       167       103        60
OIR    2025250     91400   19.8500 -113.6500       8.7       167       104        60
OIR    2025250     91400   19.8500 -113.6600       8.7       168       104        60
OIR    2025250     91400   19.8500 -113.6700       8.8       168       104        60
OIR    2025250     91400   19.8500 -113.6800       8.8       169       104        60
OIR    2025250     91400   19.8500 -113.6900       8.8       169       104        60
OIR    2025250     91400   19.8500 -113.7000       8.9       170       105        60
OIR    2025250     91400   19.8500 -113.7100       8.9       170       105        60
OIR    2025250     91400   19.8500 -113.7200       8.9       171       105        60
OIR    2025250     91400   19.8500 -113.7300       9.0       171       105        60
OIR    2025250     91400   19.8500 -113.7400       9.0       172       105        60
OIR    2025250     91400   19.8500 -113.7500       9.0       172       105        60
OIR    2025250     91400   19.8500 -113.7600       9.0       173       105        60
OIR    2025250     91400   19.8500 -113.7700       9.0       173       105        60
OIR    2025250     91400   19.8500 -113.7800       9.0       173       105        60
OIR    2025250     91400   19.8500 -113.7900       9.0       173       104        60
OIR    2025250     91400   19.8500 -113.8000       9.1       173       104        60
OIR    2025250     91400   19.8500 -113.8100       9.1       174       104        60
OIR    2025250     91400   19.8500 -113.8200       9.1       174       104        60
OIR    2025250     91400   19.8500 -113.8300       9.1       174       104        60
OIR    2025250     91400   19.8500 -113.8400       9.1       175       104        60
OIR    2025250     91400   19.8500 -113.8500       9.2       175       104        60
OIR    2025250     91400   19.8500 -113.8600       9.2       175       105        60
OIR    2025250     91400   19.8500 -113.8700       9.2       175       105        60
OIR    2025250     91400   19.8500 -113.8800       9.2       176       105        60
OIR    2025250     91400   19.8500 -113.8900       9.2       176       105        60
OIR    2025250     91400   19.8500 -113.9000       9.3       176       105        60
OIR    2025250     91400   19.8500 -113.9100       9.3       176       104        60
OIR    2025250     91400   19.8500 -113.9200       9.3       176       104        60
OIR    2025250     91400   19.8500 -113.9300       9.3       177       105        60
OIR    2025250     91400   19.8500 -113.9400       9.3       177       105        60
OIR    2025250     91400   19.8500 -113.9500       9.3       177       104        60
OIR    2025250     91400   19.8500 -113.9600       9.3       177       104        60
OIR    2025250     91400   19.8500 -113.9700       9.3       178       104        60
OIR    2025250     91400   19.8500 -113.9800       9.3       178       104        60
OIR    2025250     91400   19.8500 -113.9900       9.3       178       104        60
OIR    2025250     91400   19.8500 -114.0000       9.3       178       107        60
OIR    2025250     91400   19.8500 -114.0100       9.3       178       107        60
OIR    2025250     91400   19.8500 -114.0200       9.3       178       107        60
OIR    2025250     91400   19.8500 -114.0300       9.3       179       107        60
OIR    2025250     91400   19.8500 -114.0400       9.3       179       108        60
OIR    2025250     91400   19.8500 -114.0500       9.3       179       110        60
OIR    2025250     91400   19.8500 -114.0600       9.3       179       111        60
OIR    2025250     91400   19.8500 -114.0700       9.4       182       112        60
OIR    2025250     91400   19.8500 -114.0800       9.4       184       112        60
OIR    2025250     91400   19.8500 -114.0900       9.5       186       112        60
OIR    2025250     91400   19.8500 -114.1000       9.5       186       113        60
OIR    2025250     91400   19.8500 -114.1100       9.5       187       114        60
OIR    2025250     91400   19.8500 -114.1200       9.5       188       116        60
OIR    2025250     91400   19.8500 -114.1300       9.4       188       116        60
OIR    2025250     91400   19.8500 -114.1400       9.4       190       116        60
OIR    2025250     91400   19.8500 -114.1500       9.3       192       116        60
OIR    2025250     91400   19.8500 -114.1600       9.3       193       116        60
OIR    2025250     91400   19.8500 -114.1700       9.2       195       115        60
OIR    2025250     91400   19.8500 -114.1800       9.2       197       114        60
OIR    2025250     91400   19.8500 -114.1900       9.2       201       113        60
OIR    2025250     91400   19.8500 -114.2000       9.3       206       114        60
OIR    2025250     91400   19.8500 -114.2100       9.3       208       115        60
OIR    2025250     91400   19.8500 -114.2200       9.2       210       116        60
OIR    2025250     91400   19.8500 -114.2300       9.2       212       116        60
OIR    2025250     91400   19.8500 -114.2400       9.1       214       116        60
OIR    2025250     91400   19.8500 -114.2500       9.0       215       119        60
OIR    2025250     91400   19.8500 -114.2600       9.0       216       120        60
OIR    2025250     91400   19.8500 -114.2700       9.0       216       122        60
OIR    2025250     91400   19.8500 -114.2800       8.9       216       124        60
OIR    2025250     91400   19.8500 -114.2900       8.9       217       125        60
OIR    2025250     91400   19.8500 -114.3000       8.9       217       126        60
OIR    2025250     91400   19.8500 -114.3100       8.8       218       126        60
OIR    2025250     91400   19.8500 -114.3200       8.8       218       127        60
OIR    2025250     91400   19.8500 -114.3300       8.8       218       127        60
OIR    2025250     91400   19.8500 -114.3400       8.8       218       126        60
OIR    2025250     91400   19.8500 -114.3500       8.7       218       125        60
OIR    2025250     91400   19.8500 -114.3600       8.7       218       125        60
OIR    2025250     91400   19.8500 -114.3700       8.7       218       124        60
OIR    2025250     91400   19.8500 -114.3800       8.7       218       124        60
OIR    2025250     91400   19.8500 -114.3900       8.7       218       124        60
OIR    2025250     91400   19.8500 -114.4000       8.7       218       125        60
OIR    2025250     91400   19.8500 -114.4100       8.6       218       125        60
OIR    2025250     91400   19.8500 -114.4200       8.6       218       125        60
OIR    2025250     91400   19.8500 -114.4300       8.5       218       126        60
OIR    2025250     91400   19.8500 -114.4400       8.5       218       126        60
OIR    2025250     91400   19.8500 -114.4500       8.5       219       126        60
OIR    2025250     91400   19.8500 -114.4600       8.4       219       125        60
OIR    2025250     91400   19.8500 -114.4700       8.1       219       125        60
OIR    2025250     91400   19.8500 -114.4800       7.1       220       125        60
OIR    2025250     91400   19.8500 -114.4900       5.9       222       126        60
OIR    2025250     91400   19.8500 -114.5000       5.0       223       126        60
OIR    2025250     91400   19.8500 -114.5100       4.4       223       127        60
OIR    2025250     91400   19.8500 -115.9400       9.7       159       141        60
OIR    2025250     91400   19.8500 -115.9500      10.0       160       141        60
OIR    2025250     91400   19.8500 -115.9600      10.1       160       141        60
OIR    2025250     91400   19.8500 -115.9700      10.3       161       141        60
OIR    2025250     91400   19.8500 -115.9800      10.4       161       141        60
OIR    2025250     91400   19.8500 -115.9900      10.5       162       139        60
OIR    2025250     91400   19.8500 -116.0000      10.7       163       138        60
OIR    2025250     91400   19.8500 -116.0100      11.0       164       138        60
OIR    2025250     91400   19.8500 -116.0200      11.3       165       137        60
OIR    2025250     91400   19.8500 -116.0300      11.5       166       138        60
OIR    2025250     91400   19.8500 -116.0400      11.6       167       140        60
OIR    2025250     91400   19.8500 -116.1100      12.2       176       137        60
OIR    2025250     91400   19.8500 -116.1200      12.2       176       138        60
OIR    2025250     91400   19.8500 -116.1300      12.2       176       138        60
OIR    2025250     91400   19.8500 -116.1400      12.2       176       140        60
OIR    2025250     91400   19.8500 -118.0300       4.0        32       138        60
OIR    2025250     91400   19.8500 -118.0400       4.2        37       138        60
OIR    2025250     91400   19.8500 -118.0500       4.4        42       139        60
OIR    2025250     91400   19.8500 -118.0600       4.5        46       139        60
OIR    2025250     91400   19.8500 -118.0700       4.5        48       139        60
OIR    2025250     91400   19.8500 -118.0800       4.6        48       140        60
OIR    2025250     91400   19.8500 -118.0900       4.6        50       141        60
OIR    2025250     91400   19.8500 -118.1000       4.6        51       142        60
OIR    2025250     91400   19.8500 -118.1100       4.6        51       142        60
OIR    2025250     91400   19.8500 -118.1200       4.5        52       142        60
OIR    2025250     91400   19.8500 -118.1500       4.3        57       142        60
OIR    2025250     91400   19.8500 -118.1600       4.2        59       140        60
OIR    2025250     91400   19.8500 -118.1700       4.2        61       139        60
OIR    2025250     91400   19.8500 -118.1800       4.2        63       138        60
OIR    2025250     91400   19.8500 -118.1900       4.3        64       136        60
OIR    2025250     91400   19.8500 -118.2000       4.3        64       134        60
OIR    2025250     91400   19.8500 -118.2100       4.3        65       133        60
OIR    2025250     91400   19.8500 -118.2200       4.3        66       133        60
OIR    2025250     91400   19.8500 -118.2300       4.4        69       134        60
OIR    2025250     91400   19.8500 -118.2400       4.4        70       137        60
OIR    2025250     91400   19.8500 -118.2500       4.4        71       140        60
OIR    2025250     91400   19.8500 -118.2600       4.3        72       141        60
OIR    2025250     91400   19.8500 -118.2800       4.2        73       141        60
OIR    2025250     91400   19.8500 -118.2900       4.1        74       138        60
OIR    2025250     91400   19.8500 -118.3000       4.0        73       136        60
OIR    2025250     91400   19.8500 -118.3100       4.0        72       134        60
OIR    2025250     91400   19.8500 -118.3200       4.0        71       135        60
OIR    2025250     91400   19.8500 -118.3300       4.0        70       140        60
OIR    2025250     91400   19.8400 -112.7800      11.0       126       138        60
OIR    2025250     91400   19.8400 -112.7900      11.0       126       137        60
OIR    2025250     91400   19.8400 -112.8000      11.0       127       136        60
OIR    2025250     91400   19.8400 -112.8100      11.1       127       134        60
OIR    2025250     91400   19.8400 -112.8200      11.1       127       132        60
OIR    2025250     91400   19.8400 -112.8300      11.2       128       130        60
OIR    2025250     91400   19.8400 -112.8400      11.3       128       127        60
OIR    2025250     91400   19.8400 -112.8500      11.3       129       125        60
OIR    2025250     91400   19.8400 -112.8600      11.3       130       124        60
OIR    2025250     91400   19.8400 -112.8700      11.2       131       123        60
OIR    2025250     91400   19.8400 -112.8800      11.0       132       125        60
OIR    2025250     91400   19.8400 -112.8900      10.7       134       127        60
OIR    2025250     91400   19.8400 -112.9000      10.4       135       129        60
OIR    2025250     91400   19.8400 -112.9100      10.0       137       129        60
OIR    2025250     91400   19.8400 -112.9200       9.7       140       130        60
OIR    2025250     91400   19.8400 -112.9300       9.4       142       130        60
OIR    2025250     91400   19.8400 -112.9400       9.1       144       131        60
OIR    2025250     91400   19.8400 -112.9500       8.9       147       131        60
OIR    2025250     91400   19.8400 -112.9600       8.8       150       130        60
OIR    2025250     91400   19.8400 -112.9700       8.5       154       130        60
OIR    2025250     91400   19.8400 -112.9800       8.3       157       130        60
OIR    2025250     91400   19.8400 -112.9900       8.0       160       130        60
OIR    2025250     91400   19.8400 -113.0000       7.9       163       129        60
OIR    2025250     91400   19.8400 -113.0100       7.9       164       128        60
OIR    2025250     91400   19.8400 -113.0200       7.8       165       128        60
OIR    2025250     91400   19.8400 -113.0300       7.8       165       128        60
OIR    2025250     91400   19.8400 -113.0400       7.8       166       128        60
OIR    2025250     91400   19.8400 -113.0500       7.8       166       123        60
OIR    2025250     91400   19.8400 -113.0600       7.8       166       120        60
OIR    2025250     91400   19.8400 -113.0700       7.8       166       120        60
OIR    2025250     91400   19.8400 -113.0800       7.8       167       120        60
OIR    2025250     91400   19.8400 -113.0900       7.8       167       120        60
OIR    2025250     91400   19.8400 -113.1000       7.8       167       122        60
OIR    2025250     91400   19.8400 -113.1100       7.8       167       123        60
OIR    2025250     91400   19.8400 -113.1200       7.8       167       120        60
OIR    2025250     91400   19.8400 -113.1300       7.8       167       116        60
OIR    2025250     91400   19.8400 -113.1400       7.8       167       116        60
OIR    2025250     91400   19.8400 -113.1500       7.8       167       115        60
OIR    2025250     91400   19.8400 -113.1600       7.9       167       116        60
OIR    2025250     91400   19.8400 -113.1700       7.9       167       116        60
OIR    2025250     91400   19.8400 -113.1800       7.9       167       116        60
OIR    2025250     91400   19.8400 -113.1900       7.9       167       116        60
OIR    2025250     91400   19.8400 -113.2000       7.9       167       116        60
OIR    2025250     91400   19.8400 -113.2100       7.9       167       114        60
OIR    2025250     91400   19.8400 -113.2200       7.9       167       112        60
OIR    2025250     91400   19.8400 -113.2300       7.9       167       112        60
OIR    2025250     91400   19.8400 -113.2400       8.0       166       112        60
OIR    2025250     91400   19.8400 -113.2500       8.0       166       112        60
OIR    2025250     91400   19.8400 -113.2600       8.0       166       112        60
OIR    2025250     91400   19.8400 -113.2700       8.0       166       113        60
OIR    2025250     91400   19.8400 -113.2800       8.0       166       113        60
OIR    2025250     91400   19.8400 -113.2900       8.1       166       113        60
OIR    2025250     91400   19.8400 -113.3000       8.1       167       112        60
OIR    2025250     91400   19.8400 -113.3100       8.1       167       111        60
OIR    2025250     91400   19.8400 -113.3200       8.1       167       111        60
OIR    2025250     91400   19.8400 -113.3300       8.2       167       110        60
OIR    2025250     91400   19.8400 -113.3400       8.2       167       110        60
OIR    2025250     91400   19.8400 -113.3500       8.2       167       109        60
OIR    2025250     91400   19.8400 -113.3600       8.2       167       107        60
OIR    2025250     91400   19.8400 -113.3700       8.2       167       107        60
OIR    2025250     91400   19.8400 -113.3800       8.3       167       107        60
OIR    2025250     91400   19.8400 -113.3900       8.3       167       107        60
OIR    2025250     91400   19.8400 -113.4000       8.3       167       108        60
OIR    2025250     91400   19.8400 -113.4100       8.3       167       109        60
OIR    2025250     91400   19.8400 -113.4200       8.3       167       107        60
OIR    2025250     91400   19.8400 -113.4300       8.3       167       105        60
OIR    2025250     91400   19.8400 -113.4400       8.4       167       104        60
OIR    2025250     91400   19.8400 -113.4500       8.4       167       104        60
OIR    2025250     91400   19.8400 -113.4600       8.4       167       104        60
OIR    2025250     91400   19.8400 -113.4700       8.4       167       104        60
OIR    2025250     91400   19.8400 -113.4800       8.4       167       103        60
OIR    2025250     91400   19.8400 -113.4900       8.4       167       103        60
OIR    2025250     91400   19.8400 -113.5000       8.4       167       103        60
OIR    2025250     91400   19.8400 -113.5100       8.4       167       103        60
OIR    2025250     91400   19.8400 -113.5200       8.4       167       104        60
OIR    2025250     91400   19.8400 -113.5300       8.4       167       104        60
OIR    2025250     91400   19.8400 -113.5400       8.4       167       104        60
OIR    2025250     91400   19.8400 -113.5500       8.4       167       104        60
OIR    2025250     91400   19.8400 -113.5600       8.4       167       104        60
OIR    2025250     91400   19.8400 -113.5700       8.4       167       104        60
OIR    2025250     91400   19.8400 -113.5800       8.5       167       104        60
OIR    2025250     91400   19.8400 -113.5900       8.5       167       104        60
OIR    2025250     91400   19.8400 -113.6000       8.5       167       104        60
OIR    2025250     91400   19.8400 -113.6100       8.5       167       103        60
OIR    2025250     91400   19.8400 -113.6200       8.5       167       103        60
OIR    2025250     91400   19.8400 -113.6300       8.6       167       103        60
OIR    2025250     91400   19.8400 -113.6400       8.6       168       103        60
OIR    2025250     91400   19.8400 -113.6500       8.6       168       103        60
OIR    2025250     91400   19.8400 -113.6600       8.7       168       104        60
OIR    2025250     91400   19.8400 -113.6700       8.7       169       104        60
OIR    2025250     91400   19.8400 -113.6800       8.8       169       103        60
OIR    2025250     91400   19.8400 -113.6900       8.8       170       104        60
OIR    2025250     91400   19.8400 -113.7000       8.8       170       104        60
OIR    2025250     91400   19.8400 -113.7100       8.9       171       104        60
OIR    2025250     91400   19.8400 -113.7200       8.9       171       104        60
OIR    2025250     91400   19.8400 -113.7300       8.9       172       104        60
OIR    2025250     91400   19.8400 -113.7400       8.9       172       104        60
OIR    2025250     91400   19.8400 -113.7500       8.9       173       104        60
OIR    2025250     91400   19.8400 -113.7600       8.9       173       104        60
OIR    2025250     91400   19.8400 -113.7700       9.0       173       104        60
OIR    2025250     91400   19.8400 -113.7800       9.0       173       104        60
OIR    2025250     91400   19.8400 -113.7900       9.0       174       104        60
OIR    2025250     91400   19.8400 -113.8000       9.0       174       103        60
OIR    2025250     91400   19.8400 -113.8100       9.0       174       103        60
OIR    2025250     91400   19.8400 -113.8200       9.1       174       103        60
OIR    2025250     91400   19.8400 -113.8300       9.1       175       103        60
OIR    2025250     91400   19.8400 -113.8400       9.1       175       104        60
OIR    2025250     91400   19.8400 -113.8500       9.1       175       104        60
OIR    2025250     91400   19.8400 -113.8600       9.1       175       104        60
OIR    2025250     91400   19.8400 -113.8700       9.2       176       104        60
OIR    2025250     91400   19.8400 -113.8800       9.2       176       104        60
OIR    2025250     91400   19.8400 -113.8900       9.2       176       104        60
OIR    2025250     91400   19.8400 -113.9000       9.2       176       104        60
OIR    2025250     91400   19.8400 -113.9100       9.2       176       104        60
OIR    2025250     91400   19.8400 -113.9200       9.3       177       104        60
OIR    2025250     91400   19.8400 -113.9300       9.3       177       104        60
OIR    2025250     91400   19.8400 -113.9400       9.3       177       104        60
OIR    2025250     91400   19.8400 -113.9500       9.3       177       104        60
OIR    2025250     91400   19.8400 -113.9600       9.3       177       104        60
OIR    2025250     91400   19.8400 -113.9700       9.3       178       103        60
OIR    2025250     91400   19.8400 -113.9800       9.3       178       103        60
OIR    2025250     91400   19.8400 -113.9900       9.3       178       104        60
OIR    2025250     91400   19.8400 -114.0000       9.3       178       104        60
OIR    2025250     91400   19.8400 -114.0100       9.3       178       105        60
OIR    2025250     91400   19.8400 -114.0200       9.3       178       107        60
OIR    2025250     91400   19.8400 -114.0300       9.3       179       107        60
OIR    2025250     91400   19.8400 -114.0400       9.3       179       108        60
OIR    2025250     91400   19.8400 -114.0500       9.3       179       110        60
OIR    2025250     91400   19.8400 -114.0600       9.3       179       111        60
OIR    2025250     91400   19.8400 -114.0700       9.4       182       112        60
OIR    2025250     91400   19.8400 -114.0800       9.5       185       113        60
OIR    2025250     91400   19.8400 -114.0900       9.5       186       112        60
OIR    2025250     91400   19.8400 -114.1000       9.5       187       111        60
OIR    2025250     91400   19.8400 -114.1100       9.5       187       113        60
OIR    2025250     91400   19.8400 -114.1200       9.5       188       114        60
OIR    2025250     91400   19.8400 -114.1300       9.4       188       115        60
OIR    2025250     91400   19.8400 -114.1400       9.4       190       115        60
OIR    2025250     91400   19.8400 -114.1500       9.3       192       115        60
OIR    2025250     91400   19.8400 -114.1600       9.2       194       114        60
OIR    2025250     91400   19.8400 -114.1700       9.2       195       113        60
OIR    2025250     91400   19.8400 -114.1800       9.1       196       113        60
OIR    2025250     91400   19.8400 -114.1900       9.1       200       112        60
OIR    2025250     91400   19.8400 -114.2000       9.2       204       112        60
OIR    2025250     91400   19.8400 -114.2100       9.2       207       113        60
OIR    2025250     91400   19.8400 -114.2200       9.2       209       114        60
OIR    2025250     91400   19.8400 -114.2300       9.1       212       115        60
OIR    2025250     91400   19.8400 -114.2400       9.1       214       116        60
OIR    2025250     91400   19.8400 -114.2500       9.0       215       116        60
OIR    2025250     91400   19.8400 -114.2600       9.0       216       117        60
OIR    2025250     91400   19.8400 -114.2700       9.0       216       120        60
OIR    2025250     91400   19.8400 -114.2800       8.9       216       122        60
OIR    2025250     91400   19.8400 -114.2900       8.9       217       123        60
OIR    2025250     91400   19.8400 -114.3000       8.8       217       124        60
OIR    2025250     91400   19.8400 -114.3100       8.8       218       125        60
OIR    2025250     91400   19.8400 -114.3200       8.8       218       126        60
OIR    2025250     91400   19.8400 -114.3300       8.8       218       126        60
OIR    2025250     91400   19.8400 -114.3400       8.7       218       126        60
OIR    2025250     91400   19.8400 -114.3500       8.7       218       125        60
OIR    2025250     91400   19.8400 -114.3600       8.7       218       124        60
OIR    2025250     91400   19.8400 -114.3700       8.7       218       124        60
OIR    2025250     91400   19.8400 -114.3800       8.7       218       124        60
OIR    2025250     91400   19.8400 -114.3900       8.7       218       124        60
OIR    2025250     91400   19.8400 -114.4000       8.7       218       124        60
OIR    2025250     91400   19.8400 -114.4100       8.6       218       125        60
OIR    2025250     91400   19.8400 -114.4200       8.6       218       125        60
OIR    2025250     91400   19.8400 -114.4300       8.6       218       125        60
OIR    2025250     91400   19.8400 -114.4400       8.5       218       126        60
OIR    2025250     91400   19.8400 -114.4500       8.5       218       125        60
OIR    2025250     91400   19.8400 -114.4600       8.4       219       125        60
OIR    2025250     91400   19.8400 -114.4700       8.0       219       124        60
OIR    2025250     91400   19.8400 -114.4800       7.0       220       125        60
OIR    2025250     91400   19.8400 -114.4900       6.0       221       125        60
OIR    2025250     91400   19.8400 -114.5000       5.2       221       125        60
OIR    2025250     91400   19.8400 -114.5100       4.7       220       125        60
OIR    2025250     91400   19.8400 -114.5200       4.0       217       126        60
OIR    2025250     91400   19.8400 -115.9300       9.3       160       141        60
OIR    2025250     91400   19.8400 -115.9400       9.7       160       141        60
OIR    2025250     91400   19.8400 -115.9500      10.0       161       140        60
OIR    2025250     91400   19.8400 -115.9600      10.1       161       140        60
OIR    2025250     91400   19.8400 -115.9700      10.2       162       141        60
OIR    2025250     91400   19.8400 -115.9800      10.3       162       141        60
OIR    2025250     91400   19.8400 -115.9900      10.4       163       139        60
OIR    2025250     91400   19.8400 -116.0000      10.7       164       137        60
OIR    2025250     91400   19.8400 -116.0100      11.0       165       137        60
OIR    2025250     91400   19.8400 -116.0200      11.2       166       137        60
OIR    2025250     91400   19.8400 -116.0300      11.5       167       138        60
OIR    2025250     91400   19.8400 -116.0400      11.6       167       140        60
OIR    2025250     91400   19.8400 -116.1100      12.2       176       140        60
OIR    2025250     91400   19.8400 -116.1200      12.2       176       141        60
OIR    2025250     91400   19.8400 -116.1300      12.2       176       141        60
OIR    2025250     91400   19.8400 -116.1400      12.2       176       142        60
OIR    2025250     91400   19.8400 -116.1500      12.2       176       142        60
OIR    2025250     91400   19.8400 -117.7200       4.0       142       143        60
OIR    2025250     91400   19.8400 -118.0300       4.0        36       139        60
OIR    2025250     91400   19.8400 -118.0400       4.2        42       139        60
OIR    2025250     91400   19.8400 -118.0500       4.4        47       140        60
OIR    2025250     91400   19.8400 -118.0600       4.5        49       140        60
OIR    2025250     91400   19.8400 -118.0700       4.6        50       139        60
OIR    2025250     91400   19.8400 -118.0800       4.6        52       140        60
OIR    2025250     91400   19.8400 -118.0900       4.7        53       141        60
OIR    2025250     91400   19.8400 -118.1000       4.6        54       142        60
OIR    2025250     91400   19.8400 -118.1100       4.6        55       142        60
OIR    2025250     91400   19.8400 -118.1200       4.6        56       142        60
OIR    2025250     91400   19.8400 -118.1500       4.3        60       142        60
OIR    2025250     91400   19.8400 -118.1600       4.2        63       141        60
OIR    2025250     91400   19.8400 -118.1700       4.2        66       140        60
OIR    2025250     91400   19.8400 -118.1800       4.2        68       138        60
OIR    2025250     91400   19.8400 -118.1900       4.3        68       136        60
OIR    2025250     91400   19.8400 -118.2000       4.3        67       134        60
OIR    2025250     91400   19.8400 -118.2100       4.3        68       133        60
OIR    2025250     91400   19.8400 -118.2200       4.4        70       132        60
OIR    2025250     91400   19.8400 -118.2300       4.4        71       133        60
OIR    2025250     91400   19.8400 -118.2400       4.4        72       135        60
OIR    2025250     91400   19.8400 -118.2500       4.4        72       137        60
OIR    2025250     91400   19.8400 -118.2600       4.4        72       139        60
OIR    2025250     91400   19.8400 -118.2700       4.3        72       140        60
OIR    2025250     91400   19.8400 -118.2800       4.3        72       139        60
OIR    2025250     91400   19.8400 -118.2900       4.2        72       138        60
OIR    2025250     91400   19.8400 -118.3000       4.1        71       137        60
OIR    2025250     91400   19.8400 -118.3100       4.1        71       138        60
OIR    2025250     91400   19.8400 -118.3200       4.1        70       139        60
OIR    2025250     91400   19.8300 -112.7800      11.0       126       138        60
OIR    2025250     91400   19.8300 -112.7900      11.0       127       136        60
OIR    2025250     91400   19.8300 -112.8000      11.0       127       134        60
OIR    2025250     91400   19.8300 -112.8100      11.1       128       133        60
OIR    2025250     91400   19.8300 -112.8200      11.2       128       131        60
OIR    2025250     91400   19.8300 -112.8300      11.3       129       129        60
OIR    2025250     91400   19.8300 -112.8400      11.3       130       127        60
OIR    2025250     91400   19.8300 -112.8500      11.4       130       125        60
OIR    2025250     91400   19.8300 -112.8600      11.4       131       123        60
OIR    2025250     91400   19.8300 -112.8700      11.2       132       121        60
OIR    2025250     91400   19.8300 -112.8800      10.9       134       121        60
OIR    2025250     91400   19.8300 -112.8900      10.6       136       125        60
OIR    2025250     91400   19.8300 -112.9000      10.2       137       127        60
OIR    2025250     91400   19.8300 -112.9100       9.8       140       129        60
OIR    2025250     91400   19.8300 -112.9200       9.4       143       130        60
OIR    2025250     91400   19.8300 -112.9300       9.0       146       131        60
OIR    2025250     91400   19.8300 -112.9400       8.8       149       132        60
OIR    2025250     91400   19.8300 -112.9500       8.6       153       132        60
OIR    2025250     91400   19.8300 -112.9600       8.4       156       130        60
OIR    2025250     91400   19.8300 -112.9700       8.3       159       128        60
OIR    2025250     91400   19.8300 -112.9800       8.0       162       128        60
OIR    2025250     91400   19.8300 -112.9900       7.9       164       128        60
OIR    2025250     91400   19.8300 -113.0000       7.8       165       128        60
OIR    2025250     91400   19.8300 -113.0100       7.8       166       128        60
OIR    2025250     91400   19.8300 -113.0200       7.8       166       128        60
OIR    2025250     91400   19.8300 -113.0300       7.8       166       128        60
OIR    2025250     91400   19.8300 -113.0400       7.8       167       128        60
OIR    2025250     91400   19.8300 -113.0500       7.8       167       126        60
OIR    2025250     91400   19.8300 -113.0600       7.8       167       124        60
OIR    2025250     91400   19.8300 -113.0700       7.8       167       123        60
OIR    2025250     91400   19.8300 -113.0800       7.8       167       122        60
OIR    2025250     91400   19.8300 -113.0900       7.8       167       121        60
OIR    2025250     91400   19.8300 -113.1000       7.8       167       121        60
OIR    2025250     91400   19.8300 -113.1100       7.8       167       121        60
OIR    2025250     91400   19.8300 -113.1200       7.8       167       120        60
OIR    2025250     91400   19.8300 -113.1300       7.8       167       117        60
OIR    2025250     91400   19.8300 -113.1400       7.8       167       117        60
OIR    2025250     91400   19.8300 -113.1500       7.8       167       117        60
OIR    2025250     91400   19.8300 -113.1600       7.8       167       117        60
OIR    2025250     91400   19.8300 -113.1700       7.9       167       117        60
OIR    2025250     91400   19.8300 -113.1800       7.9       167       117        60
OIR    2025250     91400   19.8300 -113.1900       7.9       167       116        60
OIR    2025250     91400   19.8300 -113.2000       7.9       167       115        60
OIR    2025250     91400   19.8300 -113.2100       7.9       167       114        60
OIR    2025250     91400   19.8300 -113.2200       7.9       167       111        60
OIR    2025250     91400   19.8300 -113.2300       7.9       167       111        60
OIR    2025250     91400   19.8300 -113.2400       7.9       167       112        60
OIR    2025250     91400   19.8300 -113.2500       8.0       167       113        60
OIR    2025250     91400   19.8300 -113.2600       8.0       167       113        60
OIR    2025250     91400   19.8300 -113.2700       8.0       167       113        60
OIR    2025250     91400   19.8300 -113.2800       8.0       167       113        60
OIR    2025250     91400   19.8300 -113.2900       8.1       167       113        60
OIR    2025250     91400   19.8300 -113.3000       8.1       167       112        60
OIR    2025250     91400   19.8300 -113.3100       8.1       167       111        60
OIR    2025250     91400   19.8300 -113.3200       8.1       167       109        60
OIR    2025250     91400   19.8300 -113.3300       8.2       167       109        60
OIR    2025250     91400   19.8300 -113.3400       8.2       167       108        60
OIR    2025250     91400   19.8300 -113.3500       8.2       167       107        60
OIR    2025250     91400   19.8300 -113.3600       8.2       167       105        60
OIR    2025250     91400   19.8300 -113.3700       8.2       167       105        60
OIR    2025250     91400   19.8300 -113.3800       8.2       167       105        60
OIR    2025250     91400   19.8300 -113.3900       8.3       167       105        60
OIR    2025250     91400   19.8300 -113.4000       8.3       167       107        60
OIR    2025250     91400   19.8300 -113.4100       8.3       167       108        60
OIR    2025250     91400   19.8300 -113.4200       8.3       167       107        60
OIR    2025250     91400   19.8300 -113.4300       8.3       167       104        60
OIR    2025250     91400   19.8300 -113.4400       8.4       167       104        60
OIR    2025250     91400   19.8300 -113.4500       8.4       167       104        60
OIR    2025250     91400   19.8300 -113.4600       8.4       167       103        60
OIR    2025250     91400   19.8300 -113.4700       8.4       167       103        60
OIR    2025250     91400   19.8300 -113.4800       8.4       167       103        60
OIR    2025250     91400   19.8300 -113.4900       8.4       167       103        60
OIR    2025250     91400   19.8300 -113.5000       8.4       167       103        60
OIR    2025250     91400   19.8300 -113.5100       8.4       167       103        60
OIR    2025250     91400   19.8300 -113.5200       8.4       167       103        60
OIR    2025250     91400   19.8300 -113.5300       8.4       167       103        60
OIR    2025250     91400   19.8300 -113.5400       8.4       167       104        60
OIR    2025250     91400   19.8300 -113.5500       8.4       167       104        60
OIR    2025250     91400   19.8300 -113.5600       8.4       167       104        60
OIR    2025250     91400   19.8300 -113.5700       8.4       167       103        60
OIR    2025250     91400   19.8300 -113.5800       8.5       167       103        60
OIR    2025250     91400   19.8300 -113.5900       8.5       167       103        60
OIR    2025250     91400   19.8300 -113.6000       8.5       167       103        60
OIR    2025250     91400   19.8300 -113.6100       8.5       168       103        60
OIR    2025250     91400   19.8300 -113.6200       8.5       168       103        60
OIR    2025250     91400   19.8300 -113.6300       8.6       168       103        60
OIR    2025250     91400   19.8300 -113.6400       8.6       168       103        60
OIR    2025250     91400   19.8300 -113.6500       8.6       169       103        60
OIR    2025250     91400   19.8300 -113.6600       8.7       169       103        60
OIR    2025250     91400   19.8300 -113.6700       8.7       169       103        60
OIR    2025250     91400   19.8300 -113.6800       8.7       170       103        60
OIR    2025250     91400   19.8300 -113.6900       8.8       170       103        60
OIR    2025250     91400   19.8300 -113.7000       8.8       171       104        60
OIR    2025250     91400   19.8300 -113.7100       8.8       171       104        60
OIR    2025250     91400   19.8300 -113.7200       8.9       172       104        60
OIR    2025250     91400   19.8300 -113.7300       8.9       172       104        60
OIR    2025250     91400   19.8300 -113.7400       8.9       173       104        60
OIR    2025250     91400   19.8300 -113.7500       8.9       173       104        60
OIR    2025250     91400   19.8300 -113.7600       8.9       174       104        60
OIR    2025250     91400   19.8300 -113.7700       8.9       174       104        60
OIR    2025250     91400   19.8300 -113.7800       9.0       174       104        60
OIR    2025250     91400   19.8300 -113.7900       9.0       174       103        60
OIR    2025250     91400   19.8300 -113.8000       9.0       174       103        60
OIR    2025250     91400   19.8300 -113.8100       9.0       174       103        60
OIR    2025250     91400   19.8300 -113.8200       9.0       174       103        60
OIR    2025250     91400   19.8300 -113.8300       9.0       175       103        60
OIR    2025250     91400   19.8300 -113.8400       9.1       175       104        60
OIR    2025250     91400   19.8300 -113.8500       9.1       175       104        60
OIR    2025250     91400   19.8300 -113.8600       9.1       176       104        60
OIR    2025250     91400   19.8300 -113.8700       9.1       176       104        60
OIR    2025250     91400   19.8300 -113.8800       9.2       176       104        60
OIR    2025250     91400   19.8300 -113.8900       9.2       176       104        60
OIR    2025250     91400   19.8300 -113.9000       9.2       176       104        60
OIR    2025250     91400   19.8300 -113.9100       9.2       177       104        60
OIR    2025250     91400   19.8300 -113.9200       9.2       177       104        60
OIR    2025250     91400   19.8300 -113.9300       9.2       177       104        60
OIR    2025250     91400   19.8300 -113.9400       9.2       177       104        60
OIR    2025250     91400   19.8300 -113.9500       9.3       177       104        60
OIR    2025250     91400   19.8300 -113.9600       9.3       177       103        60
OIR    2025250     91400   19.8300 -113.9700       9.3       178       103        60
OIR    2025250     91400   19.8300 -113.9800       9.3       178       103        60
OIR    2025250     91400   19.8300 -113.9900       9.3       178       103        60
OIR    2025250     91400   19.8300 -114.0000       9.3       178       104        60
OIR    2025250     91400   19.8300 -114.0100       9.3       178       104        60
OIR    2025250     91400   19.8300 -114.0200       9.3       178       105        60
OIR    2025250     91400   19.8300 -114.0300       9.3       179       107        60
OIR    2025250     91400   19.8300 -114.0400       9.3       179       108        60
OIR    2025250     91400   19.8300 -114.0500       9.3       179       109        60
OIR    2025250     91400   19.8300 -114.0600       9.3       180       111        60
OIR    2025250     91400   19.8300 -114.0700       9.4       182       112        60
OIR    2025250     91400   19.8300 -114.0800       9.5       185       114        60
OIR    2025250     91400   19.8300 -114.0900       9.5       186       113        60
OIR    2025250     91400   19.8300 -114.1000       9.5       187       111        60
OIR    2025250     91400   19.8300 -114.1100       9.5       187       111        60
OIR    2025250     91400   19.8300 -114.1200       9.5       188       112        60
OIR    2025250     91400   19.8300 -114.1300       9.4       189       113        60
OIR    2025250     91400   19.8300 -114.1400       9.4       191       114        60
OIR    2025250     91400   19.8300 -114.1500       9.3       193       114        60
OIR    2025250     91400   19.8300 -114.1600       9.2       194       112        60
OIR    2025250     91400   19.8300 -114.1700       9.1       195       110        60
OIR    2025250     91400   19.8300 -114.1800       9.1       196       111        60
OIR    2025250     91400   19.8300 -114.1900       9.1       198       111        60
OIR    2025250     91400   19.8300 -114.2000       9.1       202       111        60
OIR    2025250     91400   19.8300 -114.2100       9.1       205       111        60
OIR    2025250     91400   19.8300 -114.2200       9.1       208       111        60
OIR    2025250     91400   19.8300 -114.2300       9.1       211       112        60
OIR    2025250     91400   19.8300 -114.2400       9.1       213       113        60
OIR    2025250     91400   19.8300 -114.2500       9.0       215       114        60
OIR    2025250     91400   19.8300 -114.2600       9.0       215       114        60
OIR    2025250     91400   19.8300 -114.2700       8.9       216       116        60
OIR    2025250     91400   19.8300 -114.2800       8.9       216       120        60
OIR    2025250     91400   19.8300 -114.2900       8.8       217       121        60
OIR    2025250     91400   19.8300 -114.3000       8.8       217       122        60
OIR    2025250     91400   19.8300 -114.3100       8.8       218       123        60
OIR    2025250     91400   19.8300 -114.3200       8.8       218       123        60
OIR    2025250     91400   19.8300 -114.3300       8.7       218       124        60
OIR    2025250     91400   19.8300 -114.3400       8.7       218       124        60
OIR    2025250     91400   19.8300 -114.3500       8.7       218       124        60
OIR    2025250     91400   19.8300 -114.3600       8.7       218       124        60
OIR    2025250     91400   19.8300 -114.3700       8.7       218       124        60
OIR    2025250     91400   19.8300 -114.3800       8.7       218       123        60
OIR    2025250     91400   19.8300 -114.3900       8.7       218       123        60
OIR    2025250     91400   19.8300 -114.4000       8.7       218       124        60
OIR    2025250     91400   19.8300 -114.4100       8.6       218       125        60
OIR    2025250     91400   19.8300 -114.4200       8.6       218       125        60
OIR    2025250     91400   19.8300 -114.4300       8.6       218       126        60
OIR    2025250     91400   19.8300 -114.4400       8.5       218       126        60
OIR    2025250     91400   19.8300 -114.4500       8.5       218       126        60
OIR    2025250     91400   19.8300 -114.4600       8.4       219       125        60
OIR    2025250     91400   19.8300 -114.4700       8.1       219       124        60
OIR    2025250     91400   19.8300 -114.4800       7.1       219       124        60
OIR    2025250     91400   19.8300 -114.4900       6.3       219       124        60
OIR    2025250     91400   19.8300 -114.5000       5.6       218       124        60
OIR    2025250     91400   19.8300 -114.5100       5.1       216       125        60
OIR    2025250     91400   19.8300 -114.5200       4.5       213       125        60
OIR    2025250     91400   19.8300 -114.5300       4.0       207       125        60
OIR    2025250     91400   19.8300 -115.9400       9.7       161       141        60
OIR    2025250     91400   19.8300 -115.9500      10.0       162       141        60
OIR    2025250     91400   19.8300 -115.9600      10.1       162       140        60
OIR    2025250     91400   19.8300 -115.9700      10.2       162       141        60
OIR    2025250     91400   19.8300 -115.9800      10.3       162       142        60
OIR    2025250     91400   19.8300 -115.9900      10.4       163       140        60
OIR    2025250     91400   19.8300 -116.0000      10.7       165       138        60
OIR    2025250     91400   19.8300 -116.0100      11.0       166       137        60
OIR    2025250     91400   19.8300 -116.0200      11.2       168       137        60
OIR    2025250     91400   19.8300 -116.0300      11.5       168       138        60
OIR    2025250     91400   19.8300 -116.0400      11.7       169       140        60
OIR    2025250     91400   19.8300 -116.1500      12.2       176       142        60
OIR    2025250     91400   19.8300 -116.1600      12.2       176       142        60
OIR    2025250     91400   19.8300 -118.0300       4.1        40       138        60
OIR    2025250     91400   19.8300 -118.0400       4.3        46       138        60
OIR    2025250     91400   19.8300 -118.0500       4.5        50       139        60
OIR    2025250     91400   19.8300 -118.0600       4.6        51       140        60
OIR    2025250     91400   19.8300 -118.0700       4.6        53       140        60
OIR    2025250     91400   19.8300 -118.0800       4.7        54       141        60
OIR    2025250     91400   19.8300 -118.0900       4.7        55       141        60
OIR    2025250     91400   19.8300 -118.1000       4.7        56       142        60
OIR    2025250     91400   19.8300 -118.1100       4.7        57       142        60
OIR    2025250     91400   19.8300 -118.1200       4.6        58       142        60
OIR    2025250     91400   19.8300 -118.1600       4.2        66       142        60
OIR    2025250     91400   19.8300 -118.1700       4.2        68       140        60
OIR    2025250     91400   19.8300 -118.1800       4.2        69       139        60
OIR    2025250     91400   19.8300 -118.1900       4.3        69       137        60
OIR    2025250     91400   19.8300 -118.2000       4.3        70       134        60
OIR    2025250     91400   19.8300 -118.2100       4.4        71       133        60
OIR    2025250     91400   19.8300 -118.2200       4.4        71       132        60
OIR    2025250     91400   19.8300 -118.2300       4.4        72       132        60
OIR    2025250     91400   19.8300 -118.2400       4.4        72       134        60
OIR    2025250     91400   19.8300 -118.2500       4.4        72       136        60
OIR    2025250     91400   19.8300 -118.2600       4.4        72       137        60
OIR    2025250     91400   19.8300 -118.2700       4.4        71       138        60
OIR    2025250     91400   19.8300 -118.2800       4.3        71       138        60
OIR    2025250     91400   19.8300 -118.2900       4.3        71       138        60
OIR    2025250     91400   19.8300 -118.3000       4.2        70       139        60
OIR    2025250     91400   19.8300 -118.3100       4.2        70       141        60
OIR    2025250     91400   19.8200 -112.7800      11.0       126       137        60
OIR    2025250     91400   19.8200 -112.7900      11.0       127       134        60
OIR    2025250     91400   19.8200 -112.8000      11.1       127       133        60
OIR    2025250     91400   19.8200 -112.8100      11.2       128       131        60
OIR    2025250     91400   19.8200 -112.8200      11.2       129       129        60
OIR    2025250     91400   19.8200 -112.8300      11.4       130       127        60
OIR    2025250     91400   19.8200 -112.8400      11.5       131       126        60
OIR    2025250     91400   19.8200 -112.8500      11.5       132       126        60
OIR    2025250     91400   19.8200 -112.8600      11.4       132       126        60
OIR    2025250     91400   19.8200 -112.8700      11.1       134       125        60
OIR    2025250     91400   19.8200 -112.8800      10.7       136       124        60
OIR    2025250     91400   19.8200 -112.8900      10.4       138       125        60
OIR    2025250     91400   19.8200 -112.9000       9.9       140       127        60
OIR    2025250     91400   19.8200 -112.9100       9.3       144       129        60
OIR    2025250     91400   19.8200 -112.9200       8.9       147       131        60
OIR    2025250     91400   19.8200 -112.9300       8.6       151       132        60
OIR    2025250     91400   19.8200 -112.9400       8.4       155       132        60
OIR    2025250     91400   19.8200 -112.9500       8.2       158       132        60
OIR    2025250     91400   19.8200 -112.9600       8.1       161       130        60
OIR    2025250     91400   19.8200 -112.9700       8.0       164       128        60
OIR    2025250     91400   19.8200 -112.9800       7.9       165       127        60
OIR    2025250     91400   19.8200 -112.9900       7.8       166       126        60
OIR    2025250     91400   19.8200 -113.0000       7.8       166       126        60
OIR    2025250     91400   19.8200 -113.0100       7.8       167       127        60
OIR    2025250     91400   19.8200 -113.0200       7.8       167       127        60
OIR    2025250     91400   19.8200 -113.0300       7.8       167       127        60
OIR    2025250     91400   19.8200 -113.0400       7.8       167       127        60
OIR    2025250     91400   19.8200 -113.0500       7.8       167       127        60
OIR    2025250     91400   19.8200 -113.0600       7.7       167       126        60
OIR    2025250     91400   19.8200 -113.0700       7.7       167       125        60
OIR    2025250     91400   19.8200 -113.0800       7.7       167       123        60
OIR    2025250     91400   19.8200 -113.0900       7.8       167       122        60
OIR    2025250     91400   19.8200 -113.1000       7.8       167       121        60
OIR    2025250     91400   19.8200 -113.1100       7.8       167       120        60
OIR    2025250     91400   19.8200 -113.1200       7.8       167       119        60
OIR    2025250     91400   19.8200 -113.1300       7.8       167       119        60
OIR    2025250     91400   19.8200 -113.1400       7.8       167       119        60
OIR    2025250     91400   19.8200 -113.1500       7.8       167       120        60
OIR    2025250     91400   19.8200 -113.1600       7.8       167       120        60
OIR    2025250     91400   19.8200 -113.1700       7.8       167       119        60
OIR    2025250     91400   19.8200 -113.1800       7.9       167       119        60
OIR    2025250     91400   19.8200 -113.1900       7.9       167       116        60
OIR    2025250     91400   19.8200 -113.2000       7.9       167       115        60
OIR    2025250     91400   19.8200 -113.2100       7.9       167       113        60
OIR    2025250     91400   19.8200 -113.2200       7.9       167       112        60
OIR    2025250     91400   19.8200 -113.2300       7.9       167       111        60
OIR    2025250     91400   19.8200 -113.2400       7.9       167       113        60
OIR    2025250     91400   19.8200 -113.2500       7.9       167       114        60
OIR    2025250     91400   19.8200 -113.2600       8.0       167       114        60
OIR    2025250     91400   19.8200 -113.2700       8.0       167       114        60
OIR    2025250     91400   19.8200 -113.2800       8.0       167       114        60
OIR    2025250     91400   19.8200 -113.2900       8.0       167       114        60
OIR    2025250     91400   19.8200 -113.3000       8.1       167       113        60
OIR    2025250     91400   19.8200 -113.3100       8.1       167       112        60
OIR    2025250     91400   19.8200 -113.3200       8.1       167       110        60
OIR    2025250     91400   19.8200 -113.3300       8.2       167       109        60
OIR    2025250     91400   19.8200 -113.3400       8.2       167       108        60
OIR    2025250     91400   19.8200 -113.3500       8.2       167       107        60
OIR    2025250     91400   19.8200 -113.3600       8.2       167       105        60
OIR    2025250     91400   19.8200 -113.3700       8.2       167       105        60
OIR    2025250     91400   19.8200 -113.3800       8.2       167       104        60
OIR    2025250     91400   19.8200 -113.3900       8.2       167       104        60
OIR    2025250     91400   19.8200 -113.4000       8.3       167       105        60
OIR    2025250     91400   19.8200 -113.4100       8.3       167       107        60
OIR    2025250     91400   19.8200 -113.4200       8.3       167       105        60
OIR    2025250     91400   19.8200 -113.4300       8.3       167       104        60
OIR    2025250     91400   19.8200 -113.4400       8.3       167       104        60
OIR    2025250     91400   19.8200 -113.4500       8.4       167       104        60
OIR    2025250     91400   19.8200 -113.4600       8.4       168       103        60
OIR    2025250     91400   19.8200 -113.4700       8.4       168       103        60
OIR    2025250     91400   19.8200 -113.4800       8.4       168       103        60
OIR    2025250     91400   19.8200 -113.4900       8.4       168       103        60
OIR    2025250     91400   19.8200 -113.5000       8.4       168       104        60
OIR    2025250     91400   19.8200 -113.5100       8.4       168       104        60
OIR    2025250     91400   19.8200 -113.5200       8.4       168       104        60
OIR    2025250     91400   19.8200 -113.5300       8.4       168       104        60
OIR    2025250     91400   19.8200 -113.5400       8.4       168       104        60
OIR    2025250     91400   19.8200 -113.5500       8.4       168       104        60
OIR    2025250     91400   19.8200 -113.5600       8.4       168       103        60
OIR    2025250     91400   19.8200 -113.5700       8.4       168       103        60
OIR    2025250     91400   19.8200 -113.5800       8.5       168       103        60
OIR    2025250     91400   19.8200 -113.5900       8.5       168       103        60
OIR    2025250     91400   19.8200 -113.6000       8.5       168       103        60
OIR    2025250     91400   19.8200 -113.6100       8.5       168       103        60
OIR    2025250     91400   19.8200 -113.6200       8.5       168       103        60
OIR    2025250     91400   19.8200 -113.6300       8.6       168       103        60
OIR    2025250     91400   19.8200 -113.6400       8.6       169       103        60
OIR    2025250     91400   19.8200 -113.6500       8.6       169       103        60
OIR    2025250     91400   19.8200 -113.6600       8.7       169       103        60
OIR    2025250     91400   19.8200 -113.6700       8.7       170       103        60
OIR    2025250     91400   19.8200 -113.6800       8.7       170       103        60
OIR    2025250     91400   19.8200 -113.6900       8.8       171       103        60
OIR    2025250     91400   19.8200 -113.7000       8.8       171       104        60
OIR    2025250     91400   19.8200 -113.7100       8.8       172       104        60
OIR    2025250     91400   19.8200 -113.7200       8.8       173       104        60
OIR    2025250     91400   19.8200 -113.7300       8.8       173       103        60
OIR    2025250     91400   19.8200 -113.7400       8.8       174       103        60
OIR    2025250     91400   19.8200 -113.7500       8.9       174       103        60
OIR    2025250     91400   19.8200 -113.7600       8.9       174       103        60
OIR    2025250     91400   19.8200 -113.7700       8.9       174       103        60
OIR    2025250     91400   19.8200 -113.7800       8.9       174       103        60
OIR    2025250     91400   19.8200 -113.7900       8.9       174       103        60
OIR    2025250     91400   19.8200 -113.8000       9.0       174       103        60
OIR    2025250     91400   19.8200 -113.8100       9.0       175       103        60
OIR    2025250     91400   19.8200 -113.8200       9.0       175       103        60
OIR    2025250     91400   19.8200 -113.8300       9.0       175       103        60
OIR    2025250     91400   19.8200 -113.8400       9.0       175       104        60
OIR    2025250     91400   19.8200 -113.8500       9.1       176       105        60
OIR    2025250     91400   19.8200 -113.8600       9.1       176       104        60
OIR    2025250     91400   19.8200 -113.8700       9.1       176       104        60
OIR    2025250     91400   19.8200 -113.8800       9.1       176       104        60
OIR    2025250     91400   19.8200 -113.8900       9.2       176       104        60
OIR    2025250     91400   19.8200 -113.9000       9.2       177       104        60
OIR    2025250     91400   19.8200 -113.9100       9.2       177       104        60
OIR    2025250     91400   19.8200 -113.9200       9.2       177       104        60
OIR    2025250     91400   19.8200 -113.9300       9.2       177       104        60
OIR    2025250     91400   19.8200 -113.9400       9.2       177       103        60
OIR    2025250     91400   19.8200 -113.9500       9.2       177       104        60
OIR    2025250     91400   19.8200 -113.9600       9.2       178       104        60
OIR    2025250     91400   19.8200 -113.9700       9.2       178       104        60
OIR    2025250     91400   19.8200 -113.9800       9.2       178       103        60
OIR    2025250     91400   19.8200 -113.9900       9.2       178       103        60
OIR    2025250     91400   19.8200 -114.0000       9.3       178       104        60
OIR    2025250     91400   19.8200 -114.0100       9.3       178       107        60
OIR    2025250     91400   19.8200 -114.0200       9.3       178       107        60
OIR    2025250     91400   19.8200 -114.0300       9.3       179       107        60
OIR    2025250     91400   19.8200 -114.0400       9.3       179       108        60
OIR    2025250     91400   19.8200 -114.0500       9.3       179       108        60
OIR    2025250     91400   19.8200 -114.0600       9.4       180       110        60
OIR    2025250     91400   19.8200 -114.0700       9.5       183       112        60
OIR    2025250     91400   19.8200 -114.0800       9.5       185       114        60
OIR    2025250     91400   19.8200 -114.0900       9.5       186       114        60
OIR    2025250     91400   19.8200 -114.1000       9.5       187       113        60
OIR    2025250     91400   19.8200 -114.1100       9.5       187       113        60
OIR    2025250     91400   19.8200 -114.1200       9.5       188       113        60
OIR    2025250     91400   19.8200 -114.1300       9.4       189       112        60
OIR    2025250     91400   19.8200 -114.1400       9.3       191       113        60
OIR    2025250     91400   19.8200 -114.1500       9.2       193       113        60
OIR    2025250     91400   19.8200 -114.1600       9.2       194       111        60
OIR    2025250     91400   19.8200 -114.1700       9.1       195       109        60
OIR    2025250     91400   19.8200 -114.1800       9.1       196       110        60
OIR    2025250     91400   19.8200 -114.1900       9.1       197       110        60
OIR    2025250     91400   19.8200 -114.2000       9.1       200       111        60
OIR    2025250     91400   19.8200 -114.2100       9.0       204       110        60
OIR    2025250     91400   19.8200 -114.2200       9.0       207       110        60
OIR    2025250     91400   19.8200 -114.2300       9.0       210       111        60
OIR    2025250     91400   19.8200 -114.2400       9.0       213       112        60
OIR    2025250     91400   19.8200 -114.2500       9.0       214       112        60
OIR    2025250     91400   19.8200 -114.2600       9.0       215       113        60
OIR    2025250     91400   19.8200 -114.2700       8.9       216       115        60
OIR    2025250     91400   19.8200 -114.2800       8.9       216       117        60
OIR    2025250     91400   19.8200 -114.2900       8.8       217       120        60
OIR    2025250     91400   19.8200 -114.3000       8.8       217       121        60
OIR    2025250     91400   19.8200 -114.3100       8.8       218       121        60
OIR    2025250     91400   19.8200 -114.3200       8.7       218       121        60
OIR    2025250     91400   19.8200 -114.3300       8.7       218       121        60
OIR    2025250     91400   19.8200 -114.3400       8.7       218       122        60
OIR    2025250     91400   19.8200 -114.3500       8.7       218       123        60
OIR    2025250     91400   19.8200 -114.3600       8.7       218       124        60
OIR    2025250     91400   19.8200 -114.3700       8.7       218       124        60
OIR    2025250     91400   19.8200 -114.3800       8.7       218       124        60
OIR    2025250     91400   19.8200 -114.3900       8.7       218       123        60
OIR    2025250     91400   19.8200 -114.4000       8.6       218       123        60
OIR    2025250     91400   19.8200 -114.4100       8.6       218       125        60
OIR    2025250     91400   19.8200 -114.4200       8.6       218       126        60
OIR    2025250     91400   19.8200 -114.4300       8.6       218       126        60
OIR    2025250     91400   19.8200 -114.4400       8.5       218       126        60
OIR    2025250     91400   19.8200 -114.4500       8.5       218       126        60
OIR    2025250     91400   19.8200 -114.4600       8.4       218       125        60
OIR    2025250     91400   19.8200 -114.4700       8.1       218       124        60
OIR    2025250     91400   19.8200 -114.4800       7.4       218       124        60
OIR    2025250     91400   19.8200 -114.4900       6.6       217       124        60
OIR    2025250     91400   19.8200 -114.5000       6.0       216       124        60
OIR    2025250     91400   19.8200 -114.5100       5.4       214       124        60
OIR    2025250     91400   19.8200 -114.5200       4.8       210       124        60
OIR    2025250     91400   19.8200 -114.5300       4.3       205       124        60
OIR    2025250     91400   19.8200 -114.5400       4.1       198       124        60
OIR    2025250     91400   19.8200 -114.5500       4.1       193       125        60
OIR    2025250     91400   19.8200 -114.5600       4.1       188       126        60
OIR    2025250     91400   19.8200 -115.9600      10.1       162       141        60
OIR    2025250     91400   19.8200 -115.9700      10.2       163       142        60
OIR    2025250     91400   19.8200 -115.9900      10.4       164       141        60
OIR    2025250     91400   19.8200 -116.0000      10.7       166       139        60
OIR    2025250     91400   19.8200 -116.0100      11.0       168       138        60
OIR    2025250     91400   19.8200 -116.0200      11.2       169       138        60
OIR    2025250     91400   19.8200 -116.0300      11.4       170       138        60
OIR    2025250     91400   19.8200 -116.0400      11.6       172       140        60
OIR    2025250     91400   19.8200 -116.0500      11.8       172       142        60
OIR    2025250     91400   19.8200 -118.0300       4.2        44       137        60
OIR    2025250     91400   19.8200 -118.0400       4.5        50       137        60
OIR    2025250     91400   19.8200 -118.0500       4.6        52       138        60
OIR    2025250     91400   19.8200 -118.0600       4.6        53       139        60
OIR    2025250     91400   19.8200 -118.0700       4.7        54       141        60
OIR    2025250     91400   19.8200 -118.0800       4.7        55       142        60
OIR    2025250     91400   19.8200 -118.0900       4.7        56       142        60
OIR    2025250     91400   19.8200 -118.1000       4.7        57       142        60
OIR    2025250     91400   19.8200 -118.1600       4.3        67       141        60
OIR    2025250     91400   19.8200 -118.1700       4.3        68       140        60
OIR    2025250     91400   19.8200 -118.1800       4.3        69       139        60
OIR    2025250     91400   19.8200 -118.1900       4.3        71       138        60
OIR    2025250     91400   19.8200 -118.2000       4.3        72       135        60
OIR    2025250     91400   19.8200 -118.2100       4.4        72       133        60
OIR    2025250     91400   19.8200 -118.2200       4.4        72       133        60
OIR    2025250     91400   19.8200 -118.2300       4.4        72       134        60
OIR    2025250     91400   19.8200 -118.2400       4.4        72       136        60
OIR    2025250     91400   19.8200 -118.2500       4.4        72       138        60
OIR    2025250     91400   19.8200 -118.2600       4.4        72       139        60
OIR    2025250     91400   19.8200 -118.2700       4.4        71       138        60
OIR    2025250     91400   19.8200 -118.2800       4.4        71       139        60
OIR    2025250     91400   19.8200 -118.2900       4.3        70       140        60
OIR    2025250     91400   19.8200 -118.3000       4.3        70       141        60
OIR    2025250     91400   19.8100 -112.7700      10.9       126       138        60
OIR    2025250     91400   19.8100 -112.7800      10.9       126       135        60
OIR    2025250     91400   19.8100 -112.7900      11.0       127       132        60
OIR    2025250     91400   19.8100 -112.8000      11.1       128       131        60
OIR    2025250     91400   19.8100 -112.8100      11.3       129       130        60
OIR    2025250     91400   19.8100 -112.8200      11.4       131       127        60
OIR    2025250     91400   19.8100 -112.8300      11.5       132       124        60
OIR    2025250     91400   19.8100 -112.8400      11.6       133       124        60
OIR    2025250     91400   19.8100 -112.8500      11.6       134       126        60
OIR    2025250     91400   19.8100 -112.8600      11.4       135       128        60
OIR    2025250     91400   19.8100 -112.8700      10.9       137       128        60
OIR    2025250     91400   19.8100 -112.8800      10.5       139       128        60
OIR    2025250     91400   19.8100 -112.8900      10.1       141       128        60
OIR    2025250     91400   19.8100 -112.9000       9.5       145       129        60
OIR    2025250     91400   19.8100 -112.9100       8.9       149       130        60
OIR    2025250     91400   19.8100 -112.9200       8.5       153       132        60
OIR    2025250     91400   19.8100 -112.9300       8.2       157       132        60
OIR    2025250     91400   19.8100 -112.9400       8.1       160       132        60
OIR    2025250     91400   19.8100 -112.9500       8.0       163       131        60
OIR    2025250     91400   19.8100 -112.9600       8.0       165       130        60
OIR    2025250     91400   19.8100 -112.9700       7.9       166       129        60
OIR    2025250     91400   19.8100 -112.9800       7.9       167       127        60
OIR    2025250     91400   19.8100 -112.9900       7.8       167       125        60
OIR    2025250     91400   19.8100 -113.0000       7.8       167       124        60
OIR    2025250     91400   19.8100 -113.0100       7.8       167       124        60
OIR    2025250     91400   19.8100 -113.0200       7.8       167       125        60
OIR    2025250     91400   19.8100 -113.0300       7.8       167       126        60
OIR    2025250     91400   19.8100 -113.0400       7.8       167       127        60
OIR    2025250     91400   19.8100 -113.0500       7.8       167       126        60
OIR    2025250     91400   19.8100 -113.0600       7.8       167       124        60
OIR    2025250     91400   19.8100 -113.0700       7.8       167       123        60
OIR    2025250     91400   19.8100 -113.0800       7.8       167       123        60
OIR    2025250     91400   19.8100 -113.0900       7.8       167       123        60
OIR    2025250     91400   19.8100 -113.1000       7.8       167       122        60
OIR    2025250     91400   19.8100 -113.1100       7.8       167       121        60
OIR    2025250     91400   19.8100 -113.1200       7.8       167       121        60
OIR    2025250     91400   19.8100 -113.1300       7.8       167       121        60
OIR    2025250     91400   19.8100 -113.1400       7.8       167       120        60
OIR    2025250     91400   19.8100 -113.1500       7.8       167       120        60
OIR    2025250     91400   19.8100 -113.1600       7.8       167       120        60
OIR    2025250     91400   19.8100 -113.1700       7.8       167       119        60
OIR    2025250     91400   19.8100 -113.1800       7.9       167       116        60
OIR    2025250     91400   19.8100 -113.1900       7.9       167       116        60
OIR    2025250     91400   19.8100 -113.2000       7.9       167       116        60
OIR    2025250     91400   19.8100 -113.2100       7.9       167       115        60
OIR    2025250     91400   19.8100 -113.2200       7.9       167       113        60
OIR    2025250     91400   19.8100 -113.2300       7.9       167       112        60
OIR    2025250     91400   19.8100 -113.2400       7.9       167       113        60
OIR    2025250     91400   19.8100 -113.2500       7.9       167       114        60
OIR    2025250     91400   19.8100 -113.2600       8.0       167       114        60
OIR    2025250     91400   19.8100 -113.2700       8.0       167       114        60
OIR    2025250     91400   19.8100 -113.2800       8.0       167       114        60
OIR    2025250     91400   19.8100 -113.2900       8.0       167       114        60
OIR    2025250     91400   19.8100 -113.3000       8.1       167       113        60
OIR    2025250     91400   19.8100 -113.3100       8.1       167       112        60
OIR    2025250     91400   19.8100 -113.3200       8.1       167       111        60
OIR    2025250     91400   19.8100 -113.3300       8.2       167       110        60
OIR    2025250     91400   19.8100 -113.3400       8.2       167       108        60
OIR    2025250     91400   19.8100 -113.3500       8.2       167       107        60
OIR    2025250     91400   19.8100 -113.3600       8.2       167       105        60
OIR    2025250     91400   19.8100 -113.3700       8.2       167       104        60
OIR    2025250     91400   19.8100 -113.3800       8.2       167       104        60
OIR    2025250     91400   19.8100 -113.3900       8.2       167       104        60
OIR    2025250     91400   19.8100 -113.4000       8.2       167       104        60
OIR    2025250     91400   19.8100 -113.4100       8.3       167       105        60
OIR    2025250     91400   19.8100 -113.4200       8.3       167       105        60
OIR    2025250     91400   19.8100 -113.4300       8.3       167       104        60
OIR    2025250     91400   19.8100 -113.4400       8.3       167       104        60
OIR    2025250     91400   19.8100 -113.4500       8.4       167       104        60
OIR    2025250     91400   19.8100 -113.4600       8.4       168       103        60
OIR    2025250     91400   19.8100 -113.4700       8.4       168       103        60
OIR    2025250     91400   19.8100 -113.4800       8.4       168       103        60
OIR    2025250     91400   19.8100 -113.4900       8.4       168       103        60
OIR    2025250     91400   19.8100 -113.5000       8.4       168       104        60
OIR    2025250     91400   19.8100 -113.5100       8.4       168       104        60
OIR    2025250     91400   19.8100 -113.5200       8.4       168       104        60
OIR    2025250     91400   19.8100 -113.5300       8.4       168       104        60
OIR    2025250     91400   19.8100 -113.5400       8.4       168       104        60
OIR    2025250     91400   19.8100 -113.5500       8.4       168       103        60
OIR    2025250     91400   19.8100 -113.5600       8.4       168       103        60
OIR    2025250     91400   19.8100 -113.5700       8.4       168       103        60
OIR    2025250     91400   19.8100 -113.5800       8.5       168       103        60
OIR    2025250     91400   19.8100 -113.5900       8.5       168       104        60
OIR    2025250     91400   19.8100 -113.6000       8.5       168       104        60
OIR    2025250     91400   19.8100 -113.6100       8.5       168       104        60
OIR    2025250     91400   19.8100 -113.6200       8.6       168       104        60
OIR    2025250     91400   19.8100 -113.6300       8.6       169       103        60
OIR    2025250     91400   19.8100 -113.6400       8.6       169       103        60
OIR    2025250     91400   19.8100 -113.6500       8.6       169       103        60
OIR    2025250     91400   19.8100 -113.6600       8.7       170       103        60
OIR    2025250     91400   19.8100 -113.6700       8.7       170       104        60
OIR    2025250     91400   19.8100 -113.6800       8.7       171       104        60
OIR    2025250     91400   19.8100 -113.6900       8.7       171       104        60
OIR    2025250     91400   19.8100 -113.7000       8.8       172       104        60
OIR    2025250     91400   19.8100 -113.7100       8.8       173       104        60
OIR    2025250     91400   19.8100 -113.7200       8.8       173       104        60
OIR    2025250     91400   19.8100 -113.7300       8.8       174       103        60
OIR    2025250     91400   19.8100 -113.7400       8.8       174       103        60
OIR    2025250     91400   19.8100 -113.7500       8.8       174       103        60
OIR    2025250     91400   19.8100 -113.7600       8.9       174       103        60
OIR    2025250     91400   19.8100 -113.7700       8.9       174       103        60
OIR    2025250     91400   19.8100 -113.7800       8.9       174       103        60
OIR    2025250     91400   19.8100 -113.7900       8.9       174       103        60
OIR    2025250     91400   19.8100 -113.8000       8.9       175       103        60
OIR    2025250     91400   19.8100 -113.8100       9.0       175       103        60
OIR    2025250     91400   19.8100 -113.8200       9.0       175       104        60
OIR    2025250     91400   19.8100 -113.8300       9.0       175       104        60
OIR    2025250     91400   19.8100 -113.8400       9.0       176       104        60
OIR    2025250     91400   19.8100 -113.8500       9.0       176       105        60
OIR    2025250     91400   19.8100 -113.8600       9.1       176       105        60
OIR    2025250     91400   19.8100 -113.8700       9.1       176       104        60
OIR    2025250     91400   19.8100 -113.8800       9.1       176       104        60
OIR    2025250     91400   19.8100 -113.8900       9.1       177       104        60
OIR    2025250     91400   19.8100 -113.9000       9.1       177       104        60
OIR    2025250     91400   19.8100 -113.9100       9.2       177       104        60
OIR    2025250     91400   19.8100 -113.9200       9.2       177       104        60
OIR    2025250     91400   19.8100 -113.9300       9.2       177       104        60
OIR    2025250     91400   19.8100 -113.9400       9.2       177       104        60
OIR    2025250     91400   19.8100 -113.9500       9.2       177       104        60
OIR    2025250     91400   19.8100 -113.9600       9.2       178       104        60
OIR    2025250     91400   19.8100 -113.9700       9.2       178       104        60
OIR    2025250     91400   19.8100 -113.9800       9.2       178       104        60
OIR    2025250     91400   19.8100 -113.9900       9.2       178       104        60
OIR    2025250     91400   19.8100 -114.0000       9.2       178       105        60
OIR    2025250     91400   19.8100 -114.0100       9.2       178       108        60
OIR    2025250     91400   19.8100 -114.0200       9.2       178       108        60
OIR    2025250     91400   19.8100 -114.0300       9.3       179       107        60
OIR    2025250     91400   19.8100 -114.0400       9.3       179       107        60
OIR    2025250     91400   19.8100 -114.0500       9.3       179       108        60
OIR    2025250     91400   19.8100 -114.0600       9.4       181       109        60
OIR    2025250     91400   19.8100 -114.0700       9.5       184       112        60
OIR    2025250     91400   19.8100 -114.0800       9.6       186       114        60
OIR    2025250     91400   19.8100 -114.0900       9.6       186       115        60
OIR    2025250     91400   19.8100 -114.1000       9.6       187       115        60
OIR    2025250     91400   19.8100 -114.1100       9.5       187       115        60
OIR    2025250     91400   19.8100 -114.1200       9.5       188       114        60
OIR    2025250     91400   19.8100 -114.1300       9.4       189       113        60
OIR    2025250     91400   19.8100 -114.1400       9.3       191       112        60
OIR    2025250     91400   19.8100 -114.1500       9.2       193       112        60
OIR    2025250     91400   19.8100 -114.1600       9.1       194       110        60
OIR    2025250     91400   19.8100 -114.1700       9.1       195       109        60
OIR    2025250     91400   19.8100 -114.1800       9.1       195       109        60
OIR    2025250     91400   19.8100 -114.1900       9.0       196       110        60
OIR    2025250     91400   19.8100 -114.2000       9.0       199       111        60
OIR    2025250     91400   19.8100 -114.2100       8.9       201       111        60
OIR    2025250     91400   19.8100 -114.2200       9.0       205       111        60
OIR    2025250     91400   19.8100 -114.2300       9.0       208       111        60
OIR    2025250     91400   19.8100 -114.2400       9.0       211       112        60
OIR    2025250     91400   19.8100 -114.2500       9.0       214       112        60
OIR    2025250     91400   19.8100 -114.2600       8.9       215       113        60
OIR    2025250     91400   19.8100 -114.2700       8.9       216       114        60
OIR    2025250     91400   19.8100 -114.2800       8.8       216       117        60
OIR    2025250     91400   19.8100 -114.2900       8.8       217       120        60
OIR    2025250     91400   19.8100 -114.3000       8.8       217       120        60
OIR    2025250     91400   19.8100 -114.3100       8.7       218       121        60
OIR    2025250     91400   19.8100 -114.3200       8.7       218       121        60
OIR    2025250     91400   19.8100 -114.3300       8.7       218       121        60
OIR    2025250     91400   19.8100 -114.3400       8.7       218       122        60
OIR    2025250     91400   19.8100 -114.3500       8.7       218       123        60
OIR    2025250     91400   19.8100 -114.3600       8.7       218       124        60
OIR    2025250     91400   19.8100 -114.3700       8.7       218       125        60
OIR    2025250     91400   19.8100 -114.3800       8.7       218       126        60
OIR    2025250     91400   19.8100 -114.3900       8.7       218       125        60
OIR    2025250     91400   19.8100 -114.4000       8.6       218       124        60
OIR    2025250     91400   19.8100 -114.4100       8.6       218       125        60
OIR    2025250     91400   19.8100 -114.4200       8.6       218       126        60
OIR    2025250     91400   19.8100 -114.4300       8.6       218       126        60
OIR    2025250     91400   19.8100 -114.4400       8.6       218       126        60
OIR    2025250     91400   19.8100 -114.4500       8.5       218       125        60
OIR    2025250     91400   19.8100 -114.4600       8.4       218       124        60
OIR    2025250     91400   19.8100 -114.4700       8.2       218       124        60
OIR    2025250     91400   19.8100 -114.4800       7.6       217       124        60
OIR    2025250     91400   19.8100 -114.4900       6.8       215       124        60
OIR    2025250     91400   19.8100 -114.5000       6.3       214       124        60
OIR    2025250     91400   19.8100 -114.5100       5.8       211       124        60
OIR    2025250     91400   19.8100 -114.5200       5.3       207       124        60
OIR    2025250     91400   19.8100 -114.5300       4.8       201       124        60
OIR    2025250     91400   19.8100 -114.5400       4.5       194       124        60
OIR    2025250     91400   19.8100 -114.5500       4.4       190       124        60
OIR    2025250     91400   19.8100 -114.5600       4.4       187       125        60
OIR    2025250     91400   19.8100 -114.5700       4.4       184       125        60
OIR    2025250     91400   19.8100 -114.5800       4.2       181       126        60
OIR    2025250     91400   19.8100 -114.5900       4.0       179       129        60
OIR    2025250     91400   19.8100 -115.9600      10.1       162       141        60
OIR    2025250     91400   19.8100 -115.9700      10.2       163       142        60
OIR    2025250     91400   19.8100 -115.9900      10.4       164       142        60
OIR    2025250     91400   19.8100 -116.0000      10.7       167       141        60
OIR    2025250     91400   19.8100 -116.0100      10.9       169       140        60
OIR    2025250     91400   19.8100 -116.0200      11.1       170       138        60
OIR    2025250     91400   19.8100 -116.0300      11.3       171       138        60
OIR    2025250     91400   19.8100 -116.0400      11.6       172       139        60
OIR    2025250     91400   19.8100 -116.0500      11.7       173       141        60
OIR    2025250     91400   19.8100 -116.0600      11.8       173       141        60
OIR    2025250     91400   19.8100 -116.0700      11.9       174       141        60
OIR    2025250     91400   19.8100 -118.0200       4.0        42       139        60
OIR    2025250     91400   19.8100 -118.0300       4.2        47       138        60
OIR    2025250     91400   19.8100 -118.0400       4.5        51       138        60
OIR    2025250     91400   19.8100 -118.0500       4.6        53       138        60
OIR    2025250     91400   19.8100 -118.0600       4.7        54       139        60
OIR    2025250     91400   19.8100 -118.0700       4.7        55       140        60
OIR    2025250     91400   19.8100 -118.0800       4.7        56       142        60
OIR    2025250     91400   19.8100 -118.0900       4.7        57       142        60
OIR    2025250     91400   19.8100 -118.1700       4.3        69       142        60
OIR    2025250     91400   19.8100 -118.1800       4.3        71       142        60
OIR    2025250     91400   19.8100 -118.1900       4.4        72       141        60
OIR    2025250     91400   19.8100 -118.2000       4.4        72       139        60
OIR    2025250     91400   19.8100 -118.2100       4.4        72       136        60
OIR    2025250     91400   19.8100 -118.2200       4.4        72       136        60
OIR    2025250     91400   19.8100 -118.2300       4.4        72       136        60
OIR    2025250     91400   19.8100 -118.2400       4.4        72       137        60
OIR    2025250     91400   19.8100 -118.2500       4.4        72       140        60
OIR    2025250     91400   19.8100 -118.2600       4.4        71       141        60
OIR    2025250     91400   19.8100 -118.2700       4.5        71       140        60
OIR    2025250     91400   19.8100 -118.2800       4.5        70       139        60
OIR    2025250     91400   19.8100 -118.2900       4.4        70       141        60
OIR    2025250     91400   19.8000 -112.7700      10.7       126       136        60
OIR    2025250     91400   19.8000 -112.7800      10.8       126       134        60
OIR    2025250     91400   19.8000 -112.7900      10.9       127       131        60
OIR    2025250     91400   19.8000 -112.8000      11.2       129       130        60
OIR    2025250     91400   19.8000 -112.8100      11.4       131       129        60
OIR    2025250     91400   19.8000 -112.8200      11.5       132       128        60
OIR    2025250     91400   19.8000 -112.8300      11.5       134       127        60
OIR    2025250     91400   19.8000 -112.8400      11.5       135       126        60
OIR    2025250     91400   19.8000 -112.8500      11.4       136       128        60
OIR    2025250     91400   19.8000 -112.8600      11.1       139       129        60
OIR    2025250     91400   19.8000 -112.8700      10.7       141       130        60
OIR    2025250     91400   19.8000 -112.8800      10.2       143       131        60
OIR    2025250     91400   19.8000 -112.8900       9.7       146       131        60
OIR    2025250     91400   19.8000 -112.9000       9.1       150       130        60
OIR    2025250     91400   19.8000 -112.9100       8.6       154       130        60
OIR    2025250     91400   19.8000 -112.9200       8.2       158       131        60
OIR    2025250     91400   19.8000 -112.9300       8.0       162       132        60
OIR    2025250     91400   19.8000 -112.9400       7.9       164       131        60
OIR    2025250     91400   19.8000 -112.9500       7.9       166       130        60
OIR    2025250     91400   19.8000 -112.9600       7.9       167       130        60
OIR    2025250     91400   19.8000 -112.9700       7.9       167       129        60
OIR    2025250     91400   19.8000 -112.9800       7.8       167       128        60
OIR    2025250     91400   19.8000 -112.9900       7.8       167       125        60
OIR    2025250     91400   19.8000 -113.0000       7.8       167       123        60
OIR    2025250     91400   19.8000 -113.0100       7.8       167       123        60
OIR    2025250     91400   19.8000 -113.0200       7.8       167       123        60
OIR    2025250     91400   19.8000 -113.0300       7.8       167       124        60
OIR    2025250     91400   19.8000 -113.0400       7.8       167       125        60
OIR    2025250     91400   19.8000 -113.0500       7.8       167       125        60
OIR    2025250     91400   19.8000 -113.0600       7.8       167       122        60
OIR    2025250     91400   19.8000 -113.0700       7.8       167       120        60
OIR    2025250     91400   19.8000 -113.0800       7.8       168       122        60
OIR    2025250     91400   19.8000 -113.0900       7.8       167       124        60
OIR    2025250     91400   19.8000 -113.1000       7.8       167       123        60
OIR    2025250     91400   19.8000 -113.1100       7.8       168       123        60
OIR    2025250     91400   19.8000 -113.1200       7.8       167       122        60
OIR    2025250     91400   19.8000 -113.1300       7.8       167       122        60
OIR    2025250     91400   19.8000 -113.1400       7.8       167       122        60
OIR    2025250     91400   19.8000 -113.1500       7.8       167       121        60
OIR    2025250     91400   19.8000 -113.1600       7.8       167       121        60
OIR    2025250     91400   19.8000 -113.1700       7.8       167       117        60
OIR    2025250     91400   19.8000 -113.1800       7.8       167       115        60
OIR    2025250     91400   19.8000 -113.1900       7.9       167       115        60
OIR    2025250     91400   19.8000 -113.2000       7.9       167       116        60
OIR    2025250     91400   19.8000 -113.2100       7.9       167       116        60
OIR    2025250     91400   19.8000 -113.2200       7.9       167       115        60
OIR    2025250     91400   19.8000 -113.2300       7.9       167       114        60
OIR    2025250     91400   19.8000 -113.2400       7.9       167       113        60
OIR    2025250     91400   19.8000 -113.2500       7.9       167       112        60
OIR    2025250     91400   19.8000 -113.2600       8.0       167       112        60
OIR    2025250     91400   19.8000 -113.2700       8.0       167       112        60
OIR    2025250     91400   19.8000 -113.2800       8.0       167       112        60
OIR    2025250     91400   19.8000 -113.2900       8.0       167       112        60
OIR    2025250     91400   19.8000 -113.3000       8.1       167       112        60
OIR    2025250     91400   19.8000 -113.3100       8.1       167       111        60
OIR    2025250     91400   19.8000 -113.3200       8.1       167       111        60
OIR    2025250     91400   19.8000 -113.3300       8.1       167       110        60
OIR    2025250     91400   19.8000 -113.3400       8.2       167       108        60
OIR    2025250     91400   19.8000 -113.3500       8.2       167       107        60
OIR    2025250     91400   19.8000 -113.3600       8.2       167       105        60
OIR    2025250     91400   19.8000 -113.3700       8.2       167       104        60
OIR    2025250     91400   19.8000 -113.3800       8.2       167       104        60
OIR    2025250     91400   19.8000 -113.3900       8.2       167       104        60
OIR    2025250     91400   19.8000 -113.4000       8.2       167       104        60
OIR    2025250     91400   19.8000 -113.4100       8.3       167       104        60
OIR    2025250     91400   19.8000 -113.4200       8.3       167       104        60
OIR    2025250     91400   19.8000 -113.4300       8.3       167       104        60
OIR    2025250     91400   19.8000 -113.4400       8.3       167       104        60
OIR    2025250     91400   19.8000 -113.4500       8.3       168       104        60
OIR    2025250     91400   19.8000 -113.4600       8.4       168       103        60
OIR    2025250     91400   19.8000 -113.4700       8.4       168       103        60
OIR    2025250     91400   19.8000 -113.4800       8.4       168       103        60
OIR    2025250     91400   19.8000 -113.4900       8.4       168       103        60
OIR    2025250     91400   19.8000 -113.5000       8.4       168       104        60
OIR    2025250     91400   19.8000 -113.5100       8.4       168       104        60
OIR    2025250     91400   19.8000 -113.5200       8.4       168       104        60
OIR    2025250     91400   19.8000 -113.5300       8.4       168       104        60
OIR    2025250     91400   19.8000 -113.5400       8.4       168       104        60
OIR    2025250     91400   19.8000 -113.5500       8.4       168       104        60
OIR    2025250     91400   19.8000 -113.5600       8.4       168       104        60
OIR    2025250     91400   19.8000 -113.5700       8.4       168       104        60
OIR    2025250     91400   19.8000 -113.5800       8.5       168       104        60
OIR    2025250     91400   19.8000 -113.5900       8.5       168       104        60
OIR    2025250     91400   19.8000 -113.6000       8.5       168       104        60
OIR    2025250     91400   19.8000 -113.6100       8.6       169       104        60
OIR    2025250     91400   19.8000 -113.6200       8.6       169       104        60
OIR    2025250     91400   19.8000 -113.6300       8.6       169       104        60
OIR    2025250     91400   19.8000 -113.6400       8.6       169       104        60
OIR    2025250     91400   19.8000 -113.6500       8.6       170       104        60
OIR    2025250     91400   19.8000 -113.6600       8.7       170       104        60
OIR    2025250     91400   19.8000 -113.6700       8.7       171       104        60
OIR    2025250     91400   19.8000 -113.6800       8.7       171       104        60
OIR    2025250     91400   19.8000 -113.6900       8.7       172       104        60
OIR    2025250     91400   19.8000 -113.7000       8.7       173       104        60
OIR    2025250     91400   19.8000 -113.7100       8.8       173       104        60
OIR    2025250     91400   19.8000 -113.7200       8.8       174       104        60
OIR    2025250     91400   19.8000 -113.7300       8.8       174       104        60
OIR    2025250     91400   19.8000 -113.7400       8.8       174       103        60
OIR    2025250     91400   19.8000 -113.7500       8.8       174       103        60
OIR    2025250     91400   19.8000 -113.7600       8.8       174       103        60
OIR    2025250     91400   19.8000 -113.7700       8.9       174       103        60
OIR    2025250     91400   19.8000 -113.7800       8.9       175       104        60
OIR    2025250     91400   19.8000 -113.7900       8.9       175       104        60
OIR    2025250     91400   19.8000 -113.8000       8.9       175       103        60
OIR    2025250     91400   19.8000 -113.8100       8.9       175       103        60
OIR    2025250     91400   19.8000 -113.8200       9.0       175       104        60
OIR    2025250     91400   19.8000 -113.8300       9.0       175       104        60
OIR    2025250     91400   19.8000 -113.8400       9.0       176       105        60
OIR    2025250     91400   19.8000 -113.8500       9.0       176       105        60
OIR    2025250     91400   19.8000 -113.8600       9.0       176       107        60
OIR    2025250     91400   19.8000 -113.8700       9.1       176       105        60
OIR    2025250     91400   19.8000 -113.8800       9.1       176       105        60
OIR    2025250     91400   19.8000 -113.8900       9.1       177       105        60
OIR    2025250     91400   19.8000 -113.9000       9.1       177       105        60
OIR    2025250     91400   19.8000 -113.9100       9.1       177       104        60
OIR    2025250     91400   19.8000 -113.9200       9.1       177       104        60
OIR    2025250     91400   19.8000 -113.9300       9.2       177       104        60
OIR    2025250     91400   19.8000 -113.9400       9.2       177       104        60
OIR    2025250     91400   19.8000 -113.9500       9.2       178       104        60
OIR    2025250     91400   19.8000 -113.9600       9.2       178       104        60
OIR    2025250     91400   19.8000 -113.9700       9.2       178       104        60
OIR    2025250     91400   19.8000 -113.9800       9.2       178       105        60
OIR    2025250     91400   19.8000 -113.9900       9.2       178       105        60
OIR    2025250     91400   19.8000 -114.0000       9.2       178       107        60
OIR    2025250     91400   19.8000 -114.0100       9.2       178       108        60
OIR    2025250     91400   19.8000 -114.0200       9.2       178       109        60
OIR    2025250     91400   19.8000 -114.0300       9.2       179       108        60
OIR    2025250     91400   19.8000 -114.0400       9.2       179       108        60
OIR    2025250     91400   19.8000 -114.0500       9.2       179       108        60
OIR    2025250     91400   19.8000 -114.0600       9.3       181       108        60
OIR    2025250     91400   19.8000 -114.0700       9.5       184       110        60
OIR    2025250     91400   19.8000 -114.0800       9.6       186       113        60
OIR    2025250     91400   19.8000 -114.0900       9.6       186       114        60
OIR    2025250     91400   19.8000 -114.1000       9.6       187       115        60
OIR    2025250     91400   19.8000 -114.1100       9.6       187       115        60
OIR    2025250     91400   19.8000 -114.1200       9.5       188       115        60
OIR    2025250     91400   19.8000 -114.1300       9.4       190       114        60
OIR    2025250     91400   19.8000 -114.1400       9.3       191       113        60
OIR    2025250     91400   19.8000 -114.1500       9.2       193       111        60
OIR    2025250     91400   19.8000 -114.1600       9.1       194       111        60
OIR    2025250     91400   19.8000 -114.1700       9.1       195       110        60
OIR    2025250     91400   19.8000 -114.1800       9.1       195       110        60
OIR    2025250     91400   19.8000 -114.1900       9.0       196       110        60
OIR    2025250     91400   19.8000 -114.2000       8.9       198       111        60
OIR    2025250     91400   19.8000 -114.2100       8.9       200       112        60
OIR    2025250     91400   19.8000 -114.2200       8.8       203       112        60
OIR    2025250     91400   19.8000 -114.2300       8.8       206       113        60
OIR    2025250     91400   19.8000 -114.2400       8.9       210       113        60
OIR    2025250     91400   19.8000 -114.2500       8.9       213       113        60
OIR    2025250     91400   19.8000 -114.2600       8.9       215       113        60
OIR    2025250     91400   19.8000 -114.2700       8.9       216       114        60
OIR    2025250     91400   19.8000 -114.2800       8.8       216       116        60
OIR    2025250     91400   19.8000 -114.2900       8.8       217       120        60
OIR    2025250     91400   19.8000 -114.3000       8.7       217       120        60
OIR    2025250     91400   19.8000 -114.3100       8.7       218       119        60
OIR    2025250     91400   19.8000 -114.3200       8.7       218       120        60
OIR    2025250     91400   19.8000 -114.3300       8.7       218       120        60
OIR    2025250     91400   19.8000 -114.3400       8.7       218       121        60
OIR    2025250     91400   19.8000 -114.3500       8.7       218       122        60
OIR    2025250     91400   19.8000 -114.3600       8.7       218       123        60
OIR    2025250     91400   19.8000 -114.3700       8.7       218       125        60
OIR    2025250     91400   19.8000 -114.3800       8.7       218       127        60
OIR    2025250     91400   19.8000 -114.3900       8.7       218       127        60
OIR    2025250     91400   19.8000 -114.4000       8.6       218       126        60
OIR    2025250     91400   19.8000 -114.4100       8.6       218       126        60
OIR    2025250     91400   19.8000 -114.4200       8.6       218       127        60
OIR    2025250     91400   19.8000 -114.4300       8.6       218       126        60
OIR    2025250     91400   19.8000 -114.4400       8.6       218       125        60
OIR    2025250     91400   19.8000 -114.4500       8.5       218       124        60
OIR    2025250     91400   19.8000 -114.4600       8.5       218       124        60
OIR    2025250     91400   19.8000 -114.4700       8.3       218       123        60
OIR    2025250     91400   19.8000 -114.4800       7.8       217       123        60
OIR    2025250     91400   19.8000 -114.4900       7.1       214       124        60
OIR    2025250     91400   19.8000 -114.5000       6.5       212       124        60
OIR    2025250     91400   19.8000 -114.5100       6.0       209       124        60
OIR    2025250     91400   19.8000 -114.5200       5.6       205       124        60
OIR    2025250     91400   19.8000 -114.5300       5.1       199       124        60
OIR    2025250     91400   19.8000 -114.5400       4.8       193       124        60
OIR    2025250     91400   19.8000 -114.5500       4.7       188       124        60
OIR    2025250     91400   19.8000 -114.5600       4.7       186       125        60
OIR    2025250     91400   19.8000 -114.5700       4.7       184       125        60
OIR    2025250     91400   19.8000 -114.5800       4.6       182       125        60
OIR    2025250     91400   19.8000 -114.5900       4.4       180       127        60
OIR    2025250     91400   19.8000 -114.6000       4.3       178       129        60
OIR    2025250     91400   19.8000 -115.9500      10.0       162       141        60
OIR    2025250     91400   19.8000 -115.9600      10.1       163       140        60
OIR    2025250     91400   19.8000 -115.9700      10.2       163       141        60
OIR    2025250     91400   19.8000 -115.9800      10.2       163       142        60
OIR    2025250     91400   19.8000 -116.0100      10.8       169       142        60
OIR    2025250     91400   19.8000 -116.0200      10.9       170       140        60
OIR    2025250     91400   19.8000 -116.0300      11.1       172       138        60
OIR    2025250     91400   19.8000 -116.0400      11.4       173       138        60
OIR    2025250     91400   19.8000 -116.0500      11.6       173       138        60
OIR    2025250     91400   19.8000 -116.0600      11.7       174       139        60
OIR    2025250     91400   19.8000 -116.0700      11.8       174       140        60
OIR    2025250     91400   19.8000 -116.0800      11.9       174       141        60
OIR    2025250     91400   19.8000 -117.9600       4.0       347       142        60
OIR    2025250     91400   19.8000 -118.0200       4.0        45       139        60
OIR    2025250     91400   19.8000 -118.0300       4.3        49       139        60
OIR    2025250     91400   19.8000 -118.0400       4.5        52       139        60
OIR    2025250     91400   19.8000 -118.0500       4.7        54       139        60
OIR    2025250     91400   19.8000 -118.0600       4.7        55       139        60
OIR    2025250     91400   19.8000 -118.0700       4.7        56       140        60
OIR    2025250     91400   19.8000 -118.0800       4.8        57       141        60
OIR    2025250     91400   19.8000 -118.0900       4.8        58       142        60
OIR    2025250     91400   19.8000 -118.2100       4.4        73       141        60
OIR    2025250     91400   19.8000 -118.2200       4.4        72       140        60
OIR    2025250     91400   19.8000 -118.2300       4.4        72       141        60
OIR    2025250     91400   19.8000 -118.2400       4.4        72       141        60
OIR    2025250     91400   19.8000 -118.2500       4.5        72       140        60
OIR    2025250     91400   19.8000 -118.2600       4.5        71       140        60
OIR    2025250     91400   19.8000 -118.2700       4.5        70       140        60
OIR    2025250     91400   19.8000 -118.2800       4.5        70       141        60
OIR    2025250     91400   19.7900 -112.7700      10.4       126       133        60
OIR    2025250     91400   19.7900 -112.7800      10.6       127       132        60
OIR    2025250     91400   19.7900 -112.7900      10.9       129       130        60
OIR    2025250     91400   19.7900 -112.8000      11.3       131       129        60
OIR    2025250     91400   19.7900 -112.8100      11.4       132       129        60
OIR    2025250     91400   19.7900 -112.8200      11.4       134       128        60
OIR    2025250     91400   19.7900 -112.8300      11.4       135       129        60
OIR    2025250     91400   19.7900 -112.8400      11.3       137       129        60
OIR    2025250     91400   19.7900 -112.8500      11.0       139       130        60
OIR    2025250     91400   19.7900 -112.8600      10.6       143       131        60
OIR    2025250     91400   19.7900 -112.8700      10.1       145       132        60
OIR    2025250     91400   19.7900 -112.8800       9.7       148       132        60
OIR    2025250     91400   19.7900 -112.8900       9.2       151       133        60
OIR    2025250     91400   19.7900 -112.9000       8.7       156       132        60
OIR    2025250     91400   19.7900 -112.9100       8.3       160       132        60
OIR    2025250     91400   19.7900 -112.9200       8.0       163       131        60
OIR    2025250     91400   19.7900 -112.9300       7.9       165       130        60
OIR    2025250     91400   19.7900 -112.9400       7.9       167       129        60
OIR    2025250     91400   19.7900 -112.9500       7.9       167       129        60
OIR    2025250     91400   19.7900 -112.9600       7.9       168       129        60
OIR    2025250     91400   19.7900 -112.9700       7.9       168       128        60
OIR    2025250     91400   19.7900 -112.9800       7.8       168       128        60
OIR    2025250     91400   19.7900 -112.9900       7.8       168       126        60
OIR    2025250     91400   19.7900 -113.0000       7.8       168       125        60
OIR    2025250     91400   19.7900 -113.0100       7.8       168       123        60
OIR    2025250     91400   19.7900 -113.0200       7.8       168       123        60
OIR    2025250     91400   19.7900 -113.0300       7.8       168       122        60
OIR    2025250     91400   19.7900 -113.0400       7.8       168       121        60
OIR    2025250     91400   19.7900 -113.0500       7.8       168       120        60
OIR    2025250     91400   19.7900 -113.0600       7.8       168       119        60
OIR    2025250     91400   19.7900 -113.0700       7.8       168       117        60
OIR    2025250     91400   19.7900 -113.0800       7.8       168       119        60
OIR    2025250     91400   19.7900 -113.0900       7.8       168       121        60
OIR    2025250     91400   19.7900 -113.1000       7.8       168       122        60
OIR    2025250     91400   19.7900 -113.1100       7.8       168       122        60
OIR    2025250     91400   19.7900 -113.1200       7.8       168       121        60
OIR    2025250     91400   19.7900 -113.1300       7.8       168       120        60
OIR    2025250     91400   19.7900 -113.1400       7.8       168       119        60
OIR    2025250     91400   19.7900 -113.1500       7.8       168       119        60
OIR    2025250     91400   19.7900 -113.1600       7.8       168       119        60
OIR    2025250     91400   19.7900 -113.1700       7.8       168       116        60
OIR    2025250     91400   19.7900 -113.1800       7.8       168       115        60
OIR    2025250     91400   19.7900 -113.1900       7.9       168       114        60
OIR    2025250     91400   19.7900 -113.2000       7.9       167       115        60
OIR    2025250     91400   19.7900 -113.2100       7.9       167       116        60
OIR    2025250     91400   19.7900 -113.2200       7.9       167       115        60
OIR    2025250     91400   19.7900 -113.2300       7.9       167       114        60
OIR    2025250     91400   19.7900 -113.2400       7.9       167       113        60
OIR    2025250     91400   19.7900 -113.2500       7.9       167       111        60
OIR    2025250     91400   19.7900 -113.2600       8.0       167       110        60
OIR    2025250     91400   19.7900 -113.2700       8.0       167       110        60
OIR    2025250     91400   19.7900 -113.2800       8.0       167       110        60
OIR    2025250     91400   19.7900 -113.2900       8.0       167       110        60
OIR    2025250     91400   19.7900 -113.3000       8.1       167       111        60
OIR    2025250     91400   19.7900 -113.3100       8.1       167       110        60
OIR    2025250     91400   19.7900 -113.3200       8.1       167       110        60
OIR    2025250     91400   19.7900 -113.3300       8.1       167       110        60
OIR    2025250     91400   19.7900 -113.3400       8.1       167       109        60
OIR    2025250     91400   19.7900 -113.3500       8.2       167       108        60
OIR    2025250     91400   19.7900 -113.3600       8.2       167       105        60
OIR    2025250     91400   19.7900 -113.3700       8.2       167       104        60
OIR    2025250     91400   19.7900 -113.3800       8.2       167       104        60
OIR    2025250     91400   19.7900 -113.3900       8.2       167       103        60
OIR    2025250     91400   19.7900 -113.4000       8.2       167       103        60
OIR    2025250     91400   19.7900 -113.4100       8.2       167       104        60
OIR    2025250     91400   19.7900 -113.4200       8.3       167       104        60
OIR    2025250     91400   19.7900 -113.4300       8.3       168       104        60
OIR    2025250     91400   19.7900 -113.4400       8.3       168       104        60
OIR    2025250     91400   19.7900 -113.4500       8.3       168       103        60
OIR    2025250     91400   19.7900 -113.4600       8.3       168       103        60
OIR    2025250     91400   19.7900 -113.4700       8.4       168       103        60
OIR    2025250     91400   19.7900 -113.4800       8.4       168       103        60
OIR    2025250     91400   19.7900 -113.4900       8.4       168       103        60
OIR    2025250     91400   19.7900 -113.5000       8.4       168       103        60
OIR    2025250     91400   19.7900 -113.5100       8.4       168       103        60
OIR    2025250     91400   19.7900 -113.5200       8.4       168       103        60
OIR    2025250     91400   19.7900 -113.5300       8.4       168       104        60
OIR    2025250     91400   19.7900 -113.5400       8.4       168       104        60
OIR    2025250     91400   19.7900 -113.5500       8.4       168       104        60
OIR    2025250     91400   19.7900 -113.5600       8.4       168       104        60
OIR    2025250     91400   19.7900 -113.5700       8.4       168       104        60
OIR    2025250     91400   19.7900 -113.5800       8.5       168       104        60
OIR    2025250     91400   19.7900 -113.5900       8.5       168       104        60
OIR    2025250     91400   19.7900 -113.6000       8.5       169       104        60
OIR    2025250     91400   19.7900 -113.6100       8.6       169       104        60
OIR    2025250     91400   19.7900 -113.6200       8.6       169       104        60
OIR    2025250     91400   19.7900 -113.6300       8.6       169       104        60
OIR    2025250     91400   19.7900 -113.6400       8.6       170       104        60
OIR    2025250     91400   19.7900 -113.6500       8.6       170       104        60
OIR    2025250     91400   19.7900 -113.6600       8.7       171       104        60
OIR    2025250     91400   19.7900 -113.6700       8.7       171       104        60
OIR    2025250     91400   19.7900 -113.6800       8.7       172       104        60
OIR    2025250     91400   19.7900 -113.6900       8.7       172       104        60
OIR    2025250     91400   19.7900 -113.7000       8.7       173       104        60
OIR    2025250     91400   19.7900 -113.7100       8.8       174       104        60
OIR    2025250     91400   19.7900 -113.7200       8.8       174       104        60
OIR    2025250     91400   19.7900 -113.7300       8.8       174       104        60
OIR    2025250     91400   19.7900 -113.7400       8.8       174       103        60
OIR    2025250     91400   19.7900 -113.7500       8.8       174       103        60
OIR    2025250     91400   19.7900 -113.7600       8.8       175       103        60
OIR    2025250     91400   19.7900 -113.7700       8.9       175       103        60
OIR    2025250     91400   19.7900 -113.7800       8.9       175       104        60
OIR    2025250     91400   19.7900 -113.7900       8.9       175       104        60
OIR    2025250     91400   19.7900 -113.8000       8.9       175       104        60
OIR    2025250     91400   19.7900 -113.8100       8.9       175       104        60
OIR    2025250     91400   19.7900 -113.8200       8.9       175       104        60
OIR    2025250     91400   19.7900 -113.8300       9.0       176       104        60
OIR    2025250     91400   19.7900 -113.8400       9.0       176       104        60
OIR    2025250     91400   19.7900 -113.8500       9.0       176       105        60
OIR    2025250     91400   19.7900 -113.8600       9.0       176       105        60
OIR    2025250     91400   19.7900 -113.8700       9.1       176       107        60
OIR    2025250     91400   19.7900 -113.8800       9.1       177       107        60
OIR    2025250     91400   19.7900 -113.8900       9.1       177       107        60
OIR    2025250     91400   19.7900 -113.9000       9.1       177       105        60
OIR    2025250     91400   19.7900 -113.9100       9.1       177       105        60
OIR    2025250     91400   19.7900 -113.9200       9.1       177       104        60
OIR    2025250     91400   19.7900 -113.9300       9.1       177       104        60
OIR    2025250     91400   19.7900 -113.9400       9.1       178       104        60
OIR    2025250     91400   19.7900 -113.9500       9.1       178       104        60
OIR    2025250     91400   19.7900 -113.9600       9.1       178       104        60
OIR    2025250     91400   19.7900 -113.9700       9.1       178       104        60
OIR    2025250     91400   19.7900 -113.9800       9.1       178       105        60
OIR    2025250     91400   19.7900 -113.9900       9.1       178       108        60
OIR    2025250     91400   19.7900 -114.0000       9.1       178       109        60
OIR    2025250     91400   19.7900 -114.0100       9.1       178       109        60
OIR    2025250     91400   19.7900 -114.0200       9.2       178       109        60
OIR    2025250     91400   19.7900 -114.0300       9.2       179       109        60
OIR    2025250     91400   19.7900 -114.0400       9.2       179       109        60
OIR    2025250     91400   19.7900 -114.0500       9.2       179       108        60
OIR    2025250     91400   19.7900 -114.0600       9.3       181       108        60
OIR    2025250     91400   19.7900 -114.0700       9.5       184       109        60
OIR    2025250     91400   19.7900 -114.0800       9.6       186       111        60
OIR    2025250     91400   19.7900 -114.0900       9.6       186       113        60
OIR    2025250     91400   19.7900 -114.1000       9.6       187       114        60
OIR    2025250     91400   19.7900 -114.1100       9.6       187       115        60
OIR    2025250     91400   19.7900 -114.1200       9.5       188       116        60
OIR    2025250     91400   19.7900 -114.1300       9.5       190       116        60
OIR    2025250     91400   19.7900 -114.1400       9.3       192       115        60
OIR    2025250     91400   19.7900 -114.1500       9.2       193       112        60
OIR    2025250     91400   19.7900 -114.1600       9.1       194       111        60
OIR    2025250     91400   19.7900 -114.1700       9.1       195       111        60
OIR    2025250     91400   19.7900 -114.1800       9.0       195       112        60
OIR    2025250     91400   19.7900 -114.1900       9.0       196       111        60
OIR    2025250     91400   19.7900 -114.2000       8.9       197       111        60
OIR    2025250     91400   19.7900 -114.2100       8.9       199       113        60
OIR    2025250     91400   19.7900 -114.2200       8.8       201       115        60
OIR    2025250     91400   19.7900 -114.2300       8.7       204       115        60
OIR    2025250     91400   19.7900 -114.2400       8.7       209       115        60
OIR    2025250     91400   19.7900 -114.2500       8.8       213       115        60
OIR    2025250     91400   19.7900 -114.2600       8.8       214       116        60
OIR    2025250     91400   19.7900 -114.2700       8.8       215       116        60
OIR    2025250     91400   19.7900 -114.2800       8.8       216       116        60
OIR    2025250     91400   19.7900 -114.2900       8.7       217       119        60
OIR    2025250     91400   19.7900 -114.3000       8.7       217       119        60
OIR    2025250     91400   19.7900 -114.3100       8.7       218       117        60
OIR    2025250     91400   19.7900 -114.3200       8.7       218       117        60
OIR    2025250     91400   19.7900 -114.3300       8.7       218       119        60
OIR    2025250     91400   19.7900 -114.3400       8.7       218       120        60
OIR    2025250     91400   19.7900 -114.3500       8.7       218       121        60
OIR    2025250     91400   19.7900 -114.3600       8.7       218       123        60
OIR    2025250     91400   19.7900 -114.3700       8.7       218       125        60
OIR    2025250     91400   19.7900 -114.3800       8.7       218       127        60
OIR    2025250     91400   19.7900 -114.3900       8.6       218       128        60
OIR    2025250     91400   19.7900 -114.4000       8.6       218       127        60
OIR    2025250     91400   19.7900 -114.4100       8.6       218       126        60
OIR    2025250     91400   19.7900 -114.4200       8.6       218       126        60
OIR    2025250     91400   19.7900 -114.4300       8.6       218       127        60
OIR    2025250     91400   19.7900 -114.4400       8.6       218       126        60
OIR    2025250     91400   19.7900 -114.4500       8.5       218       124        60
OIR    2025250     91400   19.7900 -114.4600       8.5       218       124        60
OIR    2025250     91400   19.7900 -114.4700       8.3       218       124        60
OIR    2025250     91400   19.7900 -114.4800       7.9       217       123        60
OIR    2025250     91400   19.7900 -114.4900       7.3       214       124        60
OIR    2025250     91400   19.7900 -114.5000       6.7       211       124        60
OIR    2025250     91400   19.7900 -114.5100       6.2       207       124        60
OIR    2025250     91400   19.7900 -114.5200       5.8       203       125        60
OIR    2025250     91400   19.7900 -114.5300       5.4       197       125        60
OIR    2025250     91400   19.7900 -114.5400       5.1       191       124        60
OIR    2025250     91400   19.7900 -114.5500       4.9       187       125        60
OIR    2025250     91400   19.7900 -114.5600       4.9       185       125        60
OIR    2025250     91400   19.7900 -114.5700       4.9       183       125        60
OIR    2025250     91400   19.7900 -114.5800       4.8       182       125        60
OIR    2025250     91400   19.7900 -114.5900       4.8       180       125        60
OIR    2025250     91400   19.7900 -114.6000       4.7       178       127        60
OIR    2025250     91400   19.7900 -114.6100       4.6       177       128        60
OIR    2025250     91400   19.7900 -114.6200       4.5       174       130        60
OIR    2025250     91400   19.7900 -114.6300       4.6       173       132        60
OIR    2025250     91400   19.7900 -114.6400       4.7       170       135        60
OIR    2025250     91400   19.7900 -115.8900       7.9       162       141        60
OIR    2025250     91400   19.7900 -115.9000       8.0       163       140        60
OIR    2025250     91400   19.7900 -115.9100       8.1       163       142        60
OIR    2025250     91400   19.7900 -115.9400       9.6       163       141        60
OIR    2025250     91400   19.7900 -115.9500       9.9       163       140        60
OIR    2025250     91400   19.7900 -115.9600      10.1       163       140        60
OIR    2025250     91400   19.7900 -115.9700      10.1       163       140        60
OIR    2025250     91400   19.7900 -116.0200      10.8       171       142        60
OIR    2025250     91400   19.7900 -116.0300      11.0       172       139        60
OIR    2025250     91400   19.7900 -116.0400      11.2       173       138        60
OIR    2025250     91400   19.7900 -116.0500      11.4       174       137        60
OIR    2025250     91400   19.7900 -116.0600      11.5       174       137        60
OIR    2025250     91400   19.7900 -116.0700      11.6       174       138        60
OIR    2025250     91400   19.7900 -116.0800      11.7       174       139        60
OIR    2025250     91400   19.7900 -116.0900      11.7       175       141        60
OIR    2025250     91400   19.7900 -117.9500       4.1       344       141        60
OIR    2025250     91400   19.7900 -118.0100       4.0        42       139        60
OIR    2025250     91400   19.7900 -118.0200       4.1        46       140        60
OIR    2025250     91400   19.7900 -118.0300       4.3        50       140        60
OIR    2025250     91400   19.7900 -118.0400       4.5        53       140        60
OIR    2025250     91400   19.7900 -118.0500       4.7        54       140        60
OIR    2025250     91400   19.7900 -118.0600       4.7        55       139        60
OIR    2025250     91400   19.7900 -118.0700       4.8        56       140        60
OIR    2025250     91400   19.7900 -118.0800       4.8        57       141        60
OIR    2025250     91400   19.7900 -118.0900       4.9        58       141        60
OIR    2025250     91400   19.7900 -118.1000       4.9        59       142        60
OIR    2025250     91400   19.7900 -118.2500       4.5        71       141        60
OIR    2025250     91400   19.7900 -118.2600       4.6        70       139        60
OIR    2025250     91400   19.7900 -118.2700       4.6        69       140        60
OIR    2025250     91400   19.7800 -112.7600       9.7       125       140        60
OIR    2025250     91400   19.7800 -112.7700      10.0       126       134        60
OIR    2025250     91400   19.7800 -112.7800      10.4       128       133        60
OIR    2025250     91400   19.7800 -112.7900      10.8       130       132        60
OIR    2025250     91400   19.7800 -112.8000      11.1       132       131        60
OIR    2025250     91400   19.7800 -112.8100      11.1       134       130        60
OIR    2025250     91400   19.7800 -112.8200      11.0       135       130        60
OIR    2025250     91400   19.7800 -112.8300      10.9       138       131        60
OIR    2025250     91400   19.7800 -112.8400      10.7       140       131        60
OIR    2025250     91400   19.7800 -112.8500      10.3       144       132        60
OIR    2025250     91400   19.7800 -112.8600       9.9       147       132        60
OIR    2025250     91400   19.7800 -112.8700       9.6       151       132        60
OIR    2025250     91400   19.7800 -112.8800       9.2       154       133        60
OIR    2025250     91400   19.7800 -112.8900       8.7       158       133        60
OIR    2025250     91400   19.7800 -112.9000       8.3       162       132        60
OIR    2025250     91400   19.7800 -112.9100       8.0       165       132        60
OIR    2025250     91400   19.7800 -112.9200       7.9       167       131        60
OIR    2025250     91400   19.7800 -112.9300       7.9       167       130        60
OIR    2025250     91400   19.7800 -112.9400       7.9       168       129        60
OIR    2025250     91400   19.7800 -112.9500       7.9       168       129        60
OIR    2025250     91400   19.7800 -112.9600       7.9       168       128        60
OIR    2025250     91400   19.7800 -112.9700       7.9       168       128        60
OIR    2025250     91400   19.7800 -112.9800       7.8       168       128        60
OIR    2025250     91400   19.7800 -112.9900       7.8       168       127        60
OIR    2025250     91400   19.7800 -113.0000       7.8       168       126        60
OIR    2025250     91400   19.7800 -113.0100       7.8       168       125        60
OIR    2025250     91400   19.7800 -113.0200       7.8       168       123        60
OIR    2025250     91400   19.7800 -113.0300       7.8       168       121        60
OIR    2025250     91400   19.7800 -113.0400       7.8       168       117        60
OIR    2025250     91400   19.7800 -113.0500       7.8       168       115        60
OIR    2025250     91400   19.7800 -113.0600       7.8       168       115        60
OIR    2025250     91400   19.7800 -113.0700       7.8       168       116        60
OIR    2025250     91400   19.7800 -113.0800       7.8       168       116        60
OIR    2025250     91400   19.7800 -113.0900       7.8       168       119        60
OIR    2025250     91400   19.7800 -113.1000       7.8       168       120        60
OIR    2025250     91400   19.7800 -113.1100       7.8       168       121        60
OIR    2025250     91400   19.7800 -113.1200       7.8       168       121        60
OIR    2025250     91400   19.7800 -113.1300       7.8       168       119        60
OIR    2025250     91400   19.7800 -113.1400       7.8       168       116        60
OIR    2025250     91400   19.7800 -113.1500       7.8       168       115        60
OIR    2025250     91400   19.7800 -113.1600       7.8       168       116        60
OIR    2025250     91400   19.7800 -113.1700       7.8       168       116        60
OIR    2025250     91400   19.7800 -113.1800       7.8       168       114        60
OIR    2025250     91400   19.7800 -113.1900       7.9       168       113        60
OIR    2025250     91400   19.7800 -113.2000       7.9       168       113        60
OIR    2025250     91400   19.7800 -113.2100       7.9       168       112        60
OIR    2025250     91400   19.7800 -113.2200       7.9       168       112        60
OIR    2025250     91400   19.7800 -113.2300       7.9       168       112        60
OIR    2025250     91400   19.7800 -113.2400       7.9       168       112        60
OIR    2025250     91400   19.7800 -113.2500       7.9       168       111        60
OIR    2025250     91400   19.7800 -113.2600       8.0       168       110        60
OIR    2025250     91400   19.7800 -113.2700       8.0       167       110        60
OIR    2025250     91400   19.7800 -113.2800       8.0       167       109        60
OIR    2025250     91400   19.7800 -113.2900       8.0       167       109        60
OIR    2025250     91400   19.7800 -113.3000       8.1       167       109        60
OIR    2025250     91400   19.7800 -113.3100       8.1       167       108        60
OIR    2025250     91400   19.7800 -113.3200       8.1       167       108        60
OIR    2025250     91400   19.7800 -113.3300       8.1       167       107        60
OIR    2025250     91400   19.7800 -113.3400       8.1       167       107        60
OIR    2025250     91400   19.7800 -113.3500       8.1       167       107        60
OIR    2025250     91400   19.7800 -113.3600       8.2       167       105        60
OIR    2025250     91400   19.7800 -113.3700       8.2       167       104        60
OIR    2025250     91400   19.7800 -113.3800       8.2       167       103        60
OIR    2025250     91400   19.7800 -113.3900       8.2       167       103        60
OIR    2025250     91400   19.7800 -113.4000       8.2       167       103        60
OIR    2025250     91400   19.7800 -113.4100       8.2       168       103        60
OIR    2025250     91400   19.7800 -113.4200       8.2       168       104        60
OIR    2025250     91400   19.7800 -113.4300       8.3       168       104        60
OIR    2025250     91400   19.7800 -113.4400       8.3       168       103        60
OIR    2025250     91400   19.7800 -113.4500       8.3       168       103        60
OIR    2025250     91400   19.7800 -113.4600       8.3       168       103        60
OIR    2025250     91400   19.7800 -113.4700       8.3       168       103        60
OIR    2025250     91400   19.7800 -113.4800       8.4       168       103        60
OIR    2025250     91400   19.7800 -113.4900       8.4       168       103        60
OIR    2025250     91400   19.7800 -113.5000       8.4       168       103        60
OIR    2025250     91400   19.7800 -113.5100       8.4       168       103        60
OIR    2025250     91400   19.7800 -113.5200       8.4       168       103        60
OIR    2025250     91400   19.7800 -113.5300       8.4       168       103        60
OIR    2025250     91400   19.7800 -113.5400       8.4       168       104        60
OIR    2025250     91400   19.7800 -113.5500       8.4       168       104        60
OIR    2025250     91400   19.7800 -113.5600       8.4       168       105        60
OIR    2025250     91400   19.7800 -113.5700       8.4       168       104        60
OIR    2025250     91400   19.7800 -113.5800       8.5       169       104        60
OIR    2025250     91400   19.7800 -113.5900       8.5       169       104        60
OIR    2025250     91400   19.7800 -113.6000       8.5       169       104        60
OIR    2025250     91400   19.7800 -113.6100       8.6       169       104        60
OIR    2025250     91400   19.7800 -113.6200       8.6       170       104        60
OIR    2025250     91400   19.7800 -113.6300       8.6       170       104        60
OIR    2025250     91400   19.7800 -113.6400       8.6       170       104        60
OIR    2025250     91400   19.7800 -113.6500       8.6       171       104        60
OIR    2025250     91400   19.7800 -113.6600       8.7       171       104        60
OIR    2025250     91400   19.7800 -113.6700       8.7       172       104        60
OIR    2025250     91400   19.7800 -113.6800       8.7       172       104        60
OIR    2025250     91400   19.7800 -113.6900       8.7       173       104        60
OIR    2025250     91400   19.7800 -113.7000       8.7       173       104        60
OIR    2025250     91400   19.7800 -113.7100       8.7       174       104        60
OIR    2025250     91400   19.7800 -113.7200       8.8       174       104        60
OIR    2025250     91400   19.7800 -113.7300       8.8       174       104        60
OIR    2025250     91400   19.7800 -113.7400       8.8       175       103        60
OIR    2025250     91400   19.7800 -113.7500       8.8       175       103        60
OIR    2025250     91400   19.7800 -113.7600       8.8       175       103        60
OIR    2025250     91400   19.7800 -113.7700       8.8       175       103        60
OIR    2025250     91400   19.7800 -113.7800       8.9       175       104        60
OIR    2025250     91400   19.7800 -113.7900       8.9       175       104        60
OIR    2025250     91400   19.7800 -113.8000       8.9       175       104        60
OIR    2025250     91400   19.7800 -113.8100       8.9       175       104        60
OIR    2025250     91400   19.7800 -113.8200       8.9       176       104        60
OIR    2025250     91400   19.7800 -113.8300       9.0       176       104        60
OIR    2025250     91400   19.7800 -113.8400       9.0       176       104        60
OIR    2025250     91400   19.7800 -113.8500       9.0       176       104        60
OIR    2025250     91400   19.7800 -113.8600       9.0       176       104        60
OIR    2025250     91400   19.7800 -113.8700       9.0       177       105        60
OIR    2025250     91400   19.7800 -113.8800       9.1       177       107        60
OIR    2025250     91400   19.7800 -113.8900       9.1       177       105        60
OIR    2025250     91400   19.7800 -113.9000       9.1       177       105        60
OIR    2025250     91400   19.7800 -113.9100       9.1       177       104        60
OIR    2025250     91400   19.7800 -113.9200       9.1       177       104        60
OIR    2025250     91400   19.7800 -113.9300       9.1       178       104        60
OIR    2025250     91400   19.7800 -113.9400       9.1       178       104        60
OIR    2025250     91400   19.7800 -113.9500       9.1       178       104        60
OIR    2025250     91400   19.7800 -113.9600       9.1       178       104        60
OIR    2025250     91400   19.7800 -113.9700       9.1       178       104        60
OIR    2025250     91400   19.7800 -113.9800       9.1       178       105        60
OIR    2025250     91400   19.7800 -113.9900       9.1       178       107        60
OIR    2025250     91400   19.7800 -114.0000       9.1       178       108        60
OIR    2025250     91400   19.7800 -114.0100       9.1       178       108        60
OIR    2025250     91400   19.7800 -114.0200       9.1       179       108        60
OIR    2025250     91400   19.7800 -114.0300       9.1       179       109        60
OIR    2025250     91400   19.7800 -114.0400       9.1       179       109        60
OIR    2025250     91400   19.7800 -114.0500       9.2       180       109        60
OIR    2025250     91400   19.7800 -114.0600       9.3       181       109        60
OIR    2025250     91400   19.7800 -114.0700       9.5       184       109        60
OIR    2025250     91400   19.7800 -114.0800       9.6       186       109        60
OIR    2025250     91400   19.7800 -114.0900       9.6       186       110        60
OIR    2025250     91400   19.7800 -114.1000       9.6       187       111        60
OIR    2025250     91400   19.7800 -114.1100       9.6       187       112        60
OIR    2025250     91400   19.7800 -114.1200       9.5       188       113        60
OIR    2025250     91400   19.7800 -114.1300       9.4       190       115        60
OIR    2025250     91400   19.7800 -114.1400       9.3       192       114        60
OIR    2025250     91400   19.7800 -114.1500       9.2       193       113        60
OIR    2025250     91400   19.7800 -114.1600       9.1       194       111        60
OIR    2025250     91400   19.7800 -114.1700       9.1       195       112        60
OIR    2025250     91400   19.7800 -114.1800       9.0       195       112        60
OIR    2025250     91400   19.7800 -114.1900       9.0       196       112        60
OIR    2025250     91400   19.7800 -114.2000       8.9       197       112        60
OIR    2025250     91400   19.7800 -114.2100       8.8       198       113        60
OIR    2025250     91400   19.7800 -114.2200       8.8       200       115        60
OIR    2025250     91400   19.7800 -114.2300       8.7       203       116        60
OIR    2025250     91400   19.7800 -114.2400       8.7       207       116        60
OIR    2025250     91400   19.7800 -114.2500       8.7       211       115        60
OIR    2025250     91400   19.7800 -114.2600       8.7       214       116        60
OIR    2025250     91400   19.7800 -114.2700       8.7       215       116        60
OIR    2025250     91400   19.7800 -114.2800       8.7       216       116        60
OIR    2025250     91400   19.7800 -114.2900       8.7       217       117        60
OIR    2025250     91400   19.7800 -114.3000       8.7       217       116        60
OIR    2025250     91400   19.7800 -114.3100       8.7       218       116        60
OIR    2025250     91400   19.7800 -114.3200       8.7       218       116        60
OIR    2025250     91400   19.7800 -114.3300       8.7       218       117        60
OIR    2025250     91400   19.7800 -114.3400       8.7       218       119        60
OIR    2025250     91400   19.7800 -114.3500       8.7       218       121        60
OIR    2025250     91400   19.7800 -114.3600       8.7       218       123        60
OIR    2025250     91400   19.7800 -114.3700       8.7       218       125        60
OIR    2025250     91400   19.7800 -114.3800       8.6       218       127        60
OIR    2025250     91400   19.7800 -114.3900       8.6       218       128        60
OIR    2025250     91400   19.7800 -114.4000       8.6       218       127        60
OIR    2025250     91400   19.7800 -114.4100       8.6       218       126        60
OIR    2025250     91400   19.7800 -114.4200       8.6       218       126        60
OIR    2025250     91400   19.7800 -114.4300       8.6       218       127        60
OIR    2025250     91400   19.7800 -114.4400       8.6       218       126        60
OIR    2025250     91400   19.7800 -114.4500       8.5       218       125        60
OIR    2025250     91400   19.7800 -114.4600       8.5       218       125        60
OIR    2025250     91400   19.7800 -114.4700       8.4       218       124        60
OIR    2025250     91400   19.7800 -114.4800       8.0       216       124        60
OIR    2025250     91400   19.7800 -114.4900       7.5       214       124        60
OIR    2025250     91400   19.7800 -114.5000       6.9       210       124        60
OIR    2025250     91400   19.7800 -114.5100       6.4       206       124        60
OIR    2025250     91400   19.7800 -114.5200       5.9       201       125        60
OIR    2025250     91400   19.7800 -114.5300       5.6       195       125        60
OIR    2025250     91400   19.7800 -114.5400       5.3       190       125        60
OIR    2025250     91400   19.7800 -114.5500       5.1       186       125        60
OIR    2025250     91400   19.7800 -114.5600       5.1       184       125        60
OIR    2025250     91400   19.7800 -114.5700       5.0       182       126        60
OIR    2025250     91400   19.7800 -114.5800       5.0       181       125        60
OIR    2025250     91400   19.7800 -114.5900       5.0       179       125        60
OIR    2025250     91400   19.7800 -114.6000       5.0       178       127        60
OIR    2025250     91400   19.7800 -114.6100       5.1       176       129        60
OIR    2025250     91400   19.7800 -114.6200       5.3       175       130        60
OIR    2025250     91400   19.7800 -114.6300       5.6       174       131        60
OIR    2025250     91400   19.7800 -114.6400       5.7       173       132        60
OIR    2025250     91400   19.7800 -114.6500       5.7       171       136        60
OIR    2025250     91400   19.7800 -114.6600       5.9       171       140        60
OIR    2025250     91400   19.7800 -115.8100       6.3       174       142        60
OIR    2025250     91400   19.7800 -115.8200       6.4       172       142        60
OIR    2025250     91400   19.7800 -115.8300       6.7       169       141        60
OIR    2025250     91400   19.7800 -115.8400       6.9       168       142        60
OIR    2025250     91400   19.7800 -115.8500       7.1       166       142        60
OIR    2025250     91400   19.7800 -115.8600       7.3       165       142        60
OIR    2025250     91400   19.7800 -115.8700       7.4       165       141        60
OIR    2025250     91400   19.7800 -115.8800       7.6       164       141        60
OIR    2025250     91400   19.7800 -115.8900       7.8       164       140        60
OIR    2025250     91400   19.7800 -115.9000       7.9       164       139        60
OIR    2025250     91400   19.7800 -115.9400       9.2       164       140        60
OIR    2025250     91400   19.7800 -115.9500       9.7       163       139        60
OIR    2025250     91400   19.7800 -115.9600       9.9       163       139        60
OIR    2025250     91400   19.7800 -115.9700      10.0       164       139        60
OIR    2025250     91400   19.7800 -116.0400      11.1       174       140        60
OIR    2025250     91400   19.7800 -116.0500      11.2       174       138        60
OIR    2025250     91400   19.7800 -116.0600      11.3       174       136        60
OIR    2025250     91400   19.7800 -116.0700      11.4       175       137        60
OIR    2025250     91400   19.7800 -116.0800      11.5       175       137        60
OIR    2025250     91400   19.7800 -116.0900      11.5       175       139        60
OIR    2025250     91400   19.7800 -116.1000      11.6       175       140        60
OIR    2025250     91400   19.7800 -117.9300       4.2       342       142        60
OIR    2025250     91400   19.7800 -117.9400       4.1       343       141        60
OIR    2025250     91400   19.7800 -117.9500       4.0       345       139        60
OIR    2025250     91400   19.7800 -118.0100       4.0        44       140        60
OIR    2025250     91400   19.7800 -118.0200       4.2        48       141        60
OIR    2025250     91400   19.7800 -118.0300       4.3        50       141        60
OIR    2025250     91400   19.7800 -118.0400       4.5        53       141        60
OIR    2025250     91400   19.7800 -118.0500       4.6        55       140        60
OIR    2025250     91400   19.7800 -118.0600       4.7        56       139        60
OIR    2025250     91400   19.7800 -118.0700       4.8        57       139        60
OIR    2025250     91400   19.7800 -118.0800       4.9        58       140        60
OIR    2025250     91400   19.7800 -118.0900       4.9        59       140        60
OIR    2025250     91400   19.7800 -118.1000       4.9        59       140        60
OIR    2025250     91400   19.7800 -118.1100       4.9        60       141        60
OIR    2025250     91400   19.7800 -118.2500       4.6        70       142        60
OIR    2025250     91400   19.7800 -118.2600       4.7        69       139        60
OIR    2025250     91400   19.7800 -118.2700       4.8        68       139        60
OIR    2025250     91400   19.7800 -118.2800       4.9        67       141        60
OIR    2025250     91400   19.7700 -112.7600       9.2       125       138        60
OIR    2025250     91400   19.7700 -112.7700       9.6       127       135        60
OIR    2025250     91400   19.7700 -112.7800      10.2       130       134        60
OIR    2025250     91400   19.7700 -112.7900      10.5       133       134        60
OIR    2025250     91400   19.7700 -112.8000      10.5       135       133        60
OIR    2025250     91400   19.7700 -112.8100      10.4       137       133        60
OIR    2025250     91400   19.7700 -112.8200      10.3       139       132        60
OIR    2025250     91400   19.7700 -112.8300      10.2       141       132        60
OIR    2025250     91400   19.7700 -112.8400      10.1       144       133        60
OIR    2025250     91400   19.7700 -112.8500       9.8       148       133        60
OIR    2025250     91400   19.7700 -112.8600       9.5       151       133        60
OIR    2025250     91400   19.7700 -112.8700       9.1       156       133        60
OIR    2025250     91400   19.7700 -112.8800       8.7       160       133        60
OIR    2025250     91400   19.7700 -112.8900       8.3       163       133        60
OIR    2025250     91400   19.7700 -112.9000       8.1       166       132        60
OIR    2025250     91400   19.7700 -112.9100       7.9       167       131        60
OIR    2025250     91400   19.7700 -112.9200       7.9       168       131        60
OIR    2025250     91400   19.7700 -112.9300       7.9       168       131        60
OIR    2025250     91400   19.7700 -112.9400       7.9       168       130        60
OIR    2025250     91400   19.7700 -112.9500       7.9       168       129        60
OIR    2025250     91400   19.7700 -112.9600       7.9       168       128        60
OIR    2025250     91400   19.7700 -112.9700       7.9       168       128        60
OIR    2025250     91400   19.7700 -112.9800       7.9       168       128        60
OIR    2025250     91400   19.7700 -112.9900       7.8       168       128        60
OIR    2025250     91400   19.7700 -113.0000       7.8       168       127        60
OIR    2025250     91400   19.7700 -113.0100       7.8       168       126        60
OIR    2025250     91400   19.7700 -113.0200       7.8       168       124        60
OIR    2025250     91400   19.7700 -113.0300       7.8       168       122        60
OIR    2025250     91400   19.7700 -113.0400       7.8       168       119        60
OIR    2025250     91400   19.7700 -113.0500       7.8       168       116        60
OIR    2025250     91400   19.7700 -113.0600       7.8       168       116        60
OIR    2025250     91400   19.7700 -113.0700       7.8       168       116        60
OIR    2025250     91400   19.7700 -113.0800       7.8       168       117        60
OIR    2025250     91400   19.7700 -113.0900       7.8       168       117        60
OIR    2025250     91400   19.7700 -113.1000       7.8       168       117        60
OIR    2025250     91400   19.7700 -113.1100       7.8       168       119        60
OIR    2025250     91400   19.7700 -113.1200       7.8       168       119        60
OIR    2025250     91400   19.7700 -113.1300       7.8       168       117        60
OIR    2025250     91400   19.7700 -113.1400       7.8       168       116        60
OIR    2025250     91400   19.7700 -113.1500       7.8       168       115        60
OIR    2025250     91400   19.7700 -113.1600       7.8       168       116        60
OIR    2025250     91400   19.7700 -113.1700       7.8       168       116        60
OIR    2025250     91400   19.7700 -113.1800       7.8       168       116        60
OIR    2025250     91400   19.7700 -113.1900       7.9       168       114        60
OIR    2025250     91400   19.7700 -113.2000       7.9       168       113        60
OIR    2025250     91400   19.7700 -113.2100       7.9       168       111        60
OIR    2025250     91400   19.7700 -113.2200       7.9       168       111        60
OIR    2025250     91400   19.7700 -113.2300       7.9       168       111        60
OIR    2025250     91400   19.7700 -113.2400       7.9       168       111        60
OIR    2025250     91400   19.7700 -113.2500       7.9       168       111        60
OIR    2025250     91400   19.7700 -113.2600       8.0       168       111        60
OIR    2025250     91400   19.7700 -113.2700       8.0       168       110        60
OIR    2025250     91400   19.7700 -113.2800       8.0       168       109        60
OIR    2025250     91400   19.7700 -113.2900       8.0       168       108        60
OIR    2025250     91400   19.7700 -113.3000       8.1       168       108        60
OIR    2025250     91400   19.7700 -113.3100       8.1       168       107        60
OIR    2025250     91400   19.7700 -113.3200       8.1       168       105        60
OIR    2025250     91400   19.7700 -113.3300       8.1       168       105        60
OIR    2025250     91400   19.7700 -113.3400       8.1       168       104        60
OIR    2025250     91400   19.7700 -113.3500       8.1       168       105        60
OIR    2025250     91400   19.7700 -113.3600       8.2       167       104        60
OIR    2025250     91400   19.7700 -113.3700       8.2       167       104        60
OIR    2025250     91400   19.7700 -113.3800       8.2       167       103        60
OIR    2025250     91400   19.7700 -113.3900       8.2       168       103        60
OIR    2025250     91400   19.7700 -113.4000       8.2       168       103        60
OIR    2025250     91400   19.7700 -113.4100       8.2       168       103        60
OIR    2025250     91400   19.7700 -113.4200       8.2       168       103        60
OIR    2025250     91400   19.7700 -113.4300       8.3       168       103        60
OIR    2025250     91400   19.7700 -113.4400       8.3       168       103        60
OIR    2025250     91400   19.7700 -113.4500       8.3       168       103        60
OIR    2025250     91400   19.7700 -113.4600       8.3       168       103        60
OIR    2025250     91400   19.7700 -113.4700       8.3       168       103        60
OIR    2025250     91400   19.7700 -113.4800       8.3       168       103        60
OIR    2025250     91400   19.7700 -113.4900       8.4       168       103        60
OIR    2025250     91400   19.7700 -113.5000       8.4       168       103        60
OIR    2025250     91400   19.7700 -113.5100       8.4       168       103        60
OIR    2025250     91400   19.7700 -113.5200       8.4       168       103        60
OIR    2025250     91400   19.7700 -113.5300       8.4       168       103        60
OIR    2025250     91400   19.7700 -113.5400       8.4       168       103        60
OIR    2025250     91400   19.7700 -113.5500       8.4       168       104        60
OIR    2025250     91400   19.7700 -113.5600       8.4       168       104        60
OIR    2025250     91400   19.7700 -113.5700       8.4       169       104        60
OIR    2025250     91400   19.7700 -113.5800       8.5       169       104        60
OIR    2025250     91400   19.7700 -113.5900       8.5       169       104        60
OIR    2025250     91400   19.7700 -113.6000       8.5       169       104        60
OIR    2025250     91400   19.7700 -113.6100       8.6       170       104        60
OIR    2025250     91400   19.7700 -113.6200       8.6       170       104        60
OIR    2025250     91400   19.7700 -113.6300       8.6       170       104        60
OIR    2025250     91400   19.7700 -113.6400       8.6       171       104        60
OIR    2025250     91400   19.7700 -113.6500       8.6       171       104        60
OIR    2025250     91400   19.7700 -113.6600       8.6       172       104        60
OIR    2025250     91400   19.7700 -113.6700       8.7       172       104        60
OIR    2025250     91400   19.7700 -113.6800       8.7       173       104        60
OIR    2025250     91400   19.7700 -113.6900       8.7       173       104        60
OIR    2025250     91400   19.7700 -113.7000       8.7       174       104        60
OIR    2025250     91400   19.7700 -113.7100       8.7       174       104        60
OIR    2025250     91400   19.7700 -113.7200       8.8       174       103        60
OIR    2025250     91400   19.7700 -113.7300       8.8       175       103        60
OIR    2025250     91400   19.7700 -113.7400       8.8       175       103        60
OIR    2025250     91400   19.7700 -113.7500       8.8       175       103        60
OIR    2025250     91400   19.7700 -113.7600       8.8       175       103        60
OIR    2025250     91400   19.7700 -113.7700       8.8       175       103        60
OIR    2025250     91400   19.7700 -113.7800       8.9       175       103        60
OIR    2025250     91400   19.7700 -113.7900       8.9       175       103        60
OIR    2025250     91400   19.7700 -113.8000       8.9       175       104        60
OIR    2025250     91400   19.7700 -113.8100       8.9       176       104        60
OIR    2025250     91400   19.7700 -113.8200       8.9       176       104        60
OIR    2025250     91400   19.7700 -113.8300       9.0       176       104        60
OIR    2025250     91400   19.7700 -113.8400       9.0       176       104        60
OIR    2025250     91400   19.7700 -113.8500       9.0       176       104        60
OIR    2025250     91400   19.7700 -113.8600       9.0       176       104        60
OIR    2025250     91400   19.7700 -113.8700       9.0       177       104        60
OIR    2025250     91400   19.7700 -113.8800       9.1       177       105        60
OIR    2025250     91400   19.7700 -113.8900       9.1       177       105        60
OIR    2025250     91400   19.7700 -113.9000       9.1       177       104        60
OIR    2025250     91400   19.7700 -113.9100       9.1       177       104        60
OIR    2025250     91400   19.7700 -113.9200       9.1       178       104        60
OIR    2025250     91400   19.7700 -113.9300       9.1       178       104        60
OIR    2025250     91400   19.7700 -113.9400       9.1       178       104        60
OIR    2025250     91400   19.7700 -113.9500       9.1       178       104        60
OIR    2025250     91400   19.7700 -113.9600       9.1       178       104        60
OIR    2025250     91400   19.7700 -113.9700       9.1       178       104        60
OIR    2025250     91400   19.7700 -113.9800       9.1       178       104        60
OIR    2025250     91400   19.7700 -113.9900       9.1       178       105        60
OIR    2025250     91400   19.7700 -114.0000       9.1       178       108        60
OIR    2025250     91400   19.7700 -114.0100       9.1       178       108        60
OIR    2025250     91400   19.7700 -114.0200       9.1       179       108        60
OIR    2025250     91400   19.7700 -114.0300       9.1       179       109        60
OIR    2025250     91400   19.7700 -114.0400       9.1       179       109        60
OIR    2025250     91400   19.7700 -114.0500       9.1       180       110        60
OIR    2025250     91400   19.7700 -114.0600       9.2       182       109        60
OIR    2025250     91400   19.7700 -114.0700       9.4       184       109        60
OIR    2025250     91400   19.7700 -114.0800       9.5       186       108        60
OIR    2025250     91400   19.7700 -114.0900       9.5       186       107        60
OIR    2025250     91400   19.7700 -114.1000       9.5       187       108        60
OIR    2025250     91400   19.7700 -114.1100       9.5       187       109        60
OIR    2025250     91400   19.7700 -114.1200       9.5       188       111        60
OIR    2025250     91400   19.7700 -114.1300       9.4       191       113        60
OIR    2025250     91400   19.7700 -114.1400       9.3       192       114        60
OIR    2025250     91400   19.7700 -114.1500       9.2       193       114        60
OIR    2025250     91400   19.7700 -114.1600       9.1       194       113        60
OIR    2025250     91400   19.7700 -114.1700       9.0       195       112        60
OIR    2025250     91400   19.7700 -114.1800       9.0       195       111        60
OIR    2025250     91400   19.7700 -114.1900       8.9       196       112        60
OIR    2025250     91400   19.7700 -114.2000       8.9       197       113        60
OIR    2025250     91400   19.7700 -114.2100       8.8       198       114        60
OIR    2025250     91400   19.7700 -114.2200       8.8       199       115        60
OIR    2025250     91400   19.7700 -114.2300       8.7       202       116        60
OIR    2025250     91400   19.7700 -114.2400       8.6       206       115        60
OIR    2025250     91400   19.7700 -114.2500       8.6       210       115        60
OIR    2025250     91400   19.7700 -114.2600       8.7       213       114        60
OIR    2025250     91400   19.7700 -114.2700       8.7       215       114        60
OIR    2025250     91400   19.7700 -114.2800       8.7       216       114        60
OIR    2025250     91400   19.7700 -114.2900       8.7       217       115        60
OIR    2025250     91400   19.7700 -114.3000       8.7       217       116        60
OIR    2025250     91400   19.7700 -114.3100       8.7       218       116        60
OIR    2025250     91400   19.7700 -114.3200       8.7       218       116        60
OIR    2025250     91400   19.7700 -114.3300       8.7       218       116        60
OIR    2025250     91400   19.7700 -114.3400       8.7       218       116        60
OIR    2025250     91400   19.7700 -114.3500       8.6       218       119        60
OIR    2025250     91400   19.7700 -114.3600       8.6       218       122        60
OIR    2025250     91400   19.7700 -114.3700       8.6       218       124        60
OIR    2025250     91400   19.7700 -114.3800       8.6       218       126        60
OIR    2025250     91400   19.7700 -114.3900       8.6       218       127        60
OIR    2025250     91400   19.7700 -114.4000       8.6       218       127        60
OIR    2025250     91400   19.7700 -114.4100       8.6       218       127        60
OIR    2025250     91400   19.7700 -114.4200       8.6       218       127        60
OIR    2025250     91400   19.7700 -114.4300       8.6       218       127        60
OIR    2025250     91400   19.7700 -114.4400       8.6       218       126        60
OIR    2025250     91400   19.7700 -114.4500       8.5       218       126        60
OIR    2025250     91400   19.7700 -114.4600       8.5       218       125        60
OIR    2025250     91400   19.7700 -114.4700       8.4       218       125        60
OIR    2025250     91400   19.7700 -114.4800       8.1       216       124        60
OIR    2025250     91400   19.7700 -114.4900       7.5       213       124        60
OIR    2025250     91400   19.7700 -114.5000       7.0       209       124        60
OIR    2025250     91400   19.7700 -114.5100       6.5       204       124        60
OIR    2025250     91400   19.7700 -114.5200       6.0       199       124        60
OIR    2025250     91400   19.7700 -114.5300       5.7       194       125        60
OIR    2025250     91400   19.7700 -114.5400       5.4       189       125        60
OIR    2025250     91400   19.7700 -114.5500       5.3       185       125        60
OIR    2025250     91400   19.7700 -114.5600       5.2       183       125        60
OIR    2025250     91400   19.7700 -114.5700       5.2       181       126        60
OIR    2025250     91400   19.7700 -114.5800       5.2       180       126        60
OIR    2025250     91400   19.7700 -114.5900       5.2       178       125        60
OIR    2025250     91400   19.7700 -114.6000       5.3       177       127        60
OIR    2025250     91400   19.7700 -114.6100       5.5       175       128        60
OIR    2025250     91400   19.7700 -114.6200       5.7       174       129        60
OIR    2025250     91400   19.7700 -114.6300       5.9       174       130        60
OIR    2025250     91400   19.7700 -114.6400       6.0       173       130        60
OIR    2025250     91400   19.7700 -114.6500       6.1       172       133        60
OIR    2025250     91400   19.7700 -114.6600       6.1       172       136        60
OIR    2025250     91400   19.7700 -114.6700       6.1       171       139        60
OIR    2025250     91400   19.7700 -115.8200       6.4       176       142        60
OIR    2025250     91400   19.7700 -115.8300       6.5       174       141        60
OIR    2025250     91400   19.7700 -115.8400       6.7       172       141        60
OIR    2025250     91400   19.7700 -115.8500       6.9       169       142        60
OIR    2025250     91400   19.7700 -115.8700       7.3       167       140        60
OIR    2025250     91400   19.7700 -115.8800       7.5       166       139        60
OIR    2025250     91400   19.7700 -115.8900       7.7       165       139        60
OIR    2025250     91400   19.7700 -115.9000       7.8       165       138        60
OIR    2025250     91400   19.7700 -115.9100       7.9       165       140        60
OIR    2025250     91400   19.7700 -115.9400       8.8       165       142        60
OIR    2025250     91400   19.7700 -115.9500       9.3       165       141        60
OIR    2025250     91400   19.7700 -115.9600       9.6       164       142        60
OIR    2025250     91400   19.7700 -116.0400      11.1       174       141        60
OIR    2025250     91400   19.7700 -116.0500      11.2       174       139        60
OIR    2025250     91400   19.7700 -116.0600      11.3       175       136        60
OIR    2025250     91400   19.7700 -116.0700      11.3       175       136        60
OIR    2025250     91400   19.7700 -116.0800      11.4       175       136        60
OIR    2025250     91400   19.7700 -116.0900      11.4       175       137        60
OIR    2025250     91400   19.7700 -116.1000      11.5       175       137        60
OIR    2025250     91400   19.7700 -116.1100      11.5       175       142        60
OIR    2025250     91400   19.7700 -118.0100       4.1        46       139        60
OIR    2025250     91400   19.7700 -118.0200       4.2        49       141        60
OIR    2025250     91400   19.7700 -118.0300       4.3        51       141        60
OIR    2025250     91400   19.7700 -118.0400       4.5        53       140        60
OIR    2025250     91400   19.7700 -118.0500       4.6        56       140        60
OIR    2025250     91400   19.7700 -118.0600       4.8        57       140        60
OIR    2025250     91400   19.7700 -118.0700       4.9        58       140        60
OIR    2025250     91400   19.7700 -118.0800       4.9        59       140        60
OIR    2025250     91400   19.7700 -118.0900       4.9        59       140        60
OIR    2025250     91400   19.7700 -118.1000       5.0        59       139        60
OIR    2025250     91400   19.7700 -118.1100       5.0        60       139        60
OIR    2025250     91400   19.7700 -118.1200       5.0        61       143        60
OIR    2025250     91400   19.7700 -118.2600       4.8        69       140        60
OIR    2025250     91400   19.7700 -118.2700       5.0        67       140        60
OIR    2025250     91400   19.7700 -118.2800       5.2        65       140        60
OIR    2025250     91400   19.7700 -118.2900       5.4        64       141        60
OIR    2025250     91400   19.7600 -112.7600       8.9       126       138        60
OIR    2025250     91400   19.7600 -112.7700       9.3       130       136        60
OIR    2025250     91400   19.7600 -112.7800       9.8       133       135        60
OIR    2025250     91400   19.7600 -112.7900      10.0       136       134        60
OIR    2025250     91400   19.7600 -112.8000       9.8       139       134        60
OIR    2025250     91400   19.7600 -112.8100       9.6       141       134        60
OIR    2025250     91400   19.7600 -112.8200       9.6       143       134        60
OIR    2025250     91400   19.7600 -112.8300       9.6       145       134        60
OIR    2025250     91400   19.7600 -112.8400       9.5       148       134        60
OIR    2025250     91400   19.7600 -112.8500       9.3       153       134        60
OIR    2025250     91400   19.7600 -112.8600       8.9       157       134        60
OIR    2025250     91400   19.7600 -112.8700       8.5       161       134        60
OIR    2025250     91400   19.7600 -112.8800       8.2       165       133        60
OIR    2025250     91400   19.7600 -112.8900       8.0       167       133        60
OIR    2025250     91400   19.7600 -112.9000       7.9       168       132        60
OIR    2025250     91400   19.7600 -112.9100       7.9       168       131        60
OIR    2025250     91400   19.7600 -112.9200       7.9       168       131        60
OIR    2025250     91400   19.7600 -112.9300       7.9       168       131        60
OIR    2025250     91400   19.7600 -112.9400       7.9       168       131        60
OIR    2025250     91400   19.7600 -112.9500       7.9       168       130        60
OIR    2025250     91400   19.7600 -112.9600       7.9       168       129        60
OIR    2025250     91400   19.7600 -112.9700       7.9       168       129        60
OIR    2025250     91400   19.7600 -112.9800       7.9       168       129        60
OIR    2025250     91400   19.7600 -112.9900       7.9       168       128        60
OIR    2025250     91400   19.7600 -113.0000       7.9       168       127        60
OIR    2025250     91400   19.7600 -113.0100       7.8       168       126        60
OIR    2025250     91400   19.7600 -113.0200       7.8       168       124        60
OIR    2025250     91400   19.7600 -113.0300       7.8       168       123        60
OIR    2025250     91400   19.7600 -113.0400       7.8       168       119        60
OIR    2025250     91400   19.7600 -113.0500       7.8       168       116        60
OIR    2025250     91400   19.7600 -113.0600       7.8       168       116        60
OIR    2025250     91400   19.7600 -113.0700       7.8       168       117        60
OIR    2025250     91400   19.7600 -113.0800       7.8       168       120        60
OIR    2025250     91400   19.7600 -113.0900       7.8       168       117        60
OIR    2025250     91400   19.7600 -113.1000       7.8       168       116        60
OIR    2025250     91400   19.7600 -113.1100       7.8       168       116        60
OIR    2025250     91400   19.7600 -113.1200       7.8       168       116        60
OIR    2025250     91400   19.7600 -113.1300       7.8       168       116        60
OIR    2025250     91400   19.7600 -113.1400       7.8       168       116        60
OIR    2025250     91400   19.7600 -113.1500       7.8       168       116        60
OIR    2025250     91400   19.7600 -113.1600       7.8       168       116        60
OIR    2025250     91400   19.7600 -113.1700       7.8       168       117        60
OIR    2025250     91400   19.7600 -113.1800       7.8       168       117        60
OIR    2025250     91400   19.7600 -113.1900       7.8       168       116        60
OIR    2025250     91400   19.7600 -113.2000       7.9       168       115        60
OIR    2025250     91400   19.7600 -113.2100       7.9       168       112        60
OIR    2025250     91400   19.7600 -113.2200       7.9       168       110        60
OIR    2025250     91400   19.7600 -113.2300       7.9       168       110        60
OIR    2025250     91400   19.7600 -113.2400       7.9       168       110        60
OIR    2025250     91400   19.7600 -113.2500       7.9       168       111        60
OIR    2025250     91400   19.7600 -113.2600       8.0       168       111        60
OIR    2025250     91400   19.7600 -113.2700       8.0       168       111        60
OIR    2025250     91400   19.7600 -113.2800       8.0       168       110        60
OIR    2025250     91400   19.7600 -113.2900       8.0       168       109        60
OIR    2025250     91400   19.7600 -113.3000       8.1       168       109        60
OIR    2025250     91400   19.7600 -113.3100       8.1       168       108        60
OIR    2025250     91400   19.7600 -113.3200       8.1       168       107        60
OIR    2025250     91400   19.7600 -113.3300       8.1       168       105        60
OIR    2025250     91400   19.7600 -113.3400       8.1       168       104        60
OIR    2025250     91400   19.7600 -113.3500       8.1       168       104        60
OIR    2025250     91400   19.7600 -113.3600       8.1       168       104        60
OIR    2025250     91400   19.7600 -113.3700       8.2       168       104        60
OIR    2025250     91400   19.7600 -113.3800       8.2       168       103        60
OIR    2025250     91400   19.7600 -113.3900       8.2       168       103        60
OIR    2025250     91400   19.7600 -113.4000       8.2       168       103        60
OIR    2025250     91400   19.7600 -113.4100       8.2       168       103        60
OIR    2025250     91400   19.7600 -113.4200       8.2       168       103        60
OIR    2025250     91400   19.7600 -113.4300       8.2       168       103        60
OIR    2025250     91400   19.7600 -113.4400       8.3       168       103        60
OIR    2025250     91400   19.7600 -113.4500       8.3       168       103        60
OIR    2025250     91400   19.7600 -113.4600       8.3       168       103        60
OIR    2025250     91400   19.7600 -113.4700       8.3       168       103        60
OIR    2025250     91400   19.7600 -113.4800       8.3       168       103        60
OIR    2025250     91400   19.7600 -113.4900       8.3       168       103        60
OIR    2025250     91400   19.7600 -113.5000       8.4       168       104        60
OIR    2025250     91400   19.7600 -113.5100       8.4       168       104        60
OIR    2025250     91400   19.7600 -113.5200       8.4       168       104        60
OIR    2025250     91400   19.7600 -113.5300       8.4       168       104        60
OIR    2025250     91400   19.7600 -113.5400       8.4       168       104        60
OIR    2025250     91400   19.7600 -113.5500       8.4       168       104        60
OIR    2025250     91400   19.7600 -113.5600       8.4       169       104        60
OIR    2025250     91400   19.7600 -113.5700       8.4       169       104        60
OIR    2025250     91400   19.7600 -113.5800       8.4       169       104        60
OIR    2025250     91400   19.7600 -113.5900       8.5       169       105        60
OIR    2025250     91400   19.7600 -113.6000       8.5       170       105        60
OIR    2025250     91400   19.7600 -113.6100       8.5       170       105        60
OIR    2025250     91400   19.7600 -113.6200       8.6       170       104        60
OIR    2025250     91400   19.7600 -113.6300       8.6       171       104        60
OIR    2025250     91400   19.7600 -113.6400       8.6       171       104        60
OIR    2025250     91400   19.7600 -113.6500       8.6       172       104        60
OIR    2025250     91400   19.7600 -113.6600       8.6       172       104        60
OIR    2025250     91400   19.7600 -113.6700       8.7       173       104        60
OIR    2025250     91400   19.7600 -113.6800       8.7       173       104        60
OIR    2025250     91400   19.7600 -113.6900       8.7       174       104        60
OIR    2025250     91400   19.7600 -113.7000       8.7       174       104        60
OIR    2025250     91400   19.7600 -113.7100       8.7       174       103        60
OIR    2025250     91400   19.7600 -113.7200       8.8       175       103        60
OIR    2025250     91400   19.7600 -113.7300       8.8       175       103        60
OIR    2025250     91400   19.7600 -113.7400       8.8       175       103        60
OIR    2025250     91400   19.7600 -113.7500       8.8       175       103        60
OIR    2025250     91400   19.7600 -113.7600       8.8       175       103        60
OIR    2025250     91400   19.7600 -113.7700       8.8       175       103        60
OIR    2025250     91400   19.7600 -113.7800       8.9       175       103        60
OIR    2025250     91400   19.7600 -113.7900       8.9       175       103        60
OIR    2025250     91400   19.7600 -113.8000       8.9       176       103        60
OIR    2025250     91400   19.7600 -113.8100       8.9       176       104        60
OIR    2025250     91400   19.7600 -113.8200       8.9       176       104        60
OIR    2025250     91400   19.7600 -113.8300       9.0       176       104        60
OIR    2025250     91400   19.7600 -113.8400       9.0       176       104        60
OIR    2025250     91400   19.7600 -113.8500       9.0       176       104        60
OIR    2025250     91400   19.7600 -113.8600       9.0       177       104        60
OIR    2025250     91400   19.7600 -113.8700       9.0       177       104        60
OIR    2025250     91400   19.7600 -113.8800       9.1       177       104        60
OIR    2025250     91400   19.7600 -113.8900       9.1       177       104        60
OIR    2025250     91400   19.7600 -113.9000       9.1       177       104        60
OIR    2025250     91400   19.7600 -113.9100       9.1       178       104        60
OIR    2025250     91400   19.7600 -113.9200       9.1       178       104        60
OIR    2025250     91400   19.7600 -113.9300       9.1       178       104        60
OIR    2025250     91400   19.7600 -113.9400       9.1       178       104        60
OIR    2025250     91400   19.7600 -113.9500       9.1       178       104        60
OIR    2025250     91400   19.7600 -113.9600       9.1       178       104        60
OIR    2025250     91400   19.7600 -113.9700       9.1       178       104        60
OIR    2025250     91400   19.7600 -113.9800       9.1       178       104        60
OIR    2025250     91400   19.7600 -113.9900       9.1       178       104        60
OIR    2025250     91400   19.7600 -114.0000       9.1       178       105        60
OIR    2025250     91400   19.7600 -114.0100       9.1       179       107        60
OIR    2025250     91400   19.7600 -114.0200       9.1       179       108        60
OIR    2025250     91400   19.7600 -114.0300       9.1       179       109        60
OIR    2025250     91400   19.7600 -114.0400       9.1       179       109        60
OIR    2025250     91400   19.7600 -114.0500       9.1       180       109        60
OIR    2025250     91400   19.7600 -114.0600       9.2       182       109        60
OIR    2025250     91400   19.7600 -114.0700       9.3       184       109        60
OIR    2025250     91400   19.7600 -114.0800       9.4       185       108        60
OIR    2025250     91400   19.7600 -114.0900       9.5       186       108        60
OIR    2025250     91400   19.7600 -114.1000       9.5       187       108        60
OIR    2025250     91400   19.7600 -114.1100       9.5       187       108        60
OIR    2025250     91400   19.7600 -114.1200       9.4       188       109        60
OIR    2025250     91400   19.7600 -114.1300       9.4       191       111        60
OIR    2025250     91400   19.7600 -114.1400       9.3       192       112        60
OIR    2025250     91400   19.7600 -114.1500       9.2       193       113        60
OIR    2025250     91400   19.7600 -114.1600       9.1       194       114        60
OIR    2025250     91400   19.7600 -114.1700       9.0       194       113        60
OIR    2025250     91400   19.7600 -114.1800       9.0       195       112        60
OIR    2025250     91400   19.7600 -114.1900       8.9       196       112        60
OIR    2025250     91400   19.7600 -114.2000       8.8       197       113        60
OIR    2025250     91400   19.7600 -114.2100       8.8       197       114        60
OIR    2025250     91400   19.7600 -114.2200       8.7       199       115        60
OIR    2025250     91400   19.7600 -114.2300       8.7       201       116        60
OIR    2025250     91400   19.7600 -114.2400       8.6       205       116        60
OIR    2025250     91400   19.7600 -114.2500       8.6       209       115        60
OIR    2025250     91400   19.7600 -114.2600       8.6       212       115        60
OIR    2025250     91400   19.7600 -114.2700       8.6       214       114        60
OIR    2025250     91400   19.7600 -114.2800       8.6       216       114        60
OIR    2025250     91400   19.7600 -114.2900       8.6       217       114        60
OIR    2025250     91400   19.7600 -114.3000       8.6       217       114        60
OIR    2025250     91400   19.7600 -114.3100       8.6       218       115        60
OIR    2025250     91400   19.7600 -114.3200       8.6       218       116        60
OIR    2025250     91400   19.7600 -114.3300       8.6       218       116        60
OIR    2025250     91400   19.7600 -114.3400       8.6       218       116        60
OIR    2025250     91400   19.7600 -114.3500       8.6       218       116        60
OIR    2025250     91400   19.7600 -114.3600       8.6       219       121        60
OIR    2025250     91400   19.7600 -114.3700       8.6       219       123        60
OIR    2025250     91400   19.7600 -114.3800       8.6       219       125        60
OIR    2025250     91400   19.7600 -114.3900       8.6       219       126        60
OIR    2025250     91400   19.7600 -114.4000       8.6       219       127        60
OIR    2025250     91400   19.7600 -114.4100       8.6       219       127        60
OIR    2025250     91400   19.7600 -114.4200       8.6       218       127        60
OIR    2025250     91400   19.7600 -114.4300       8.6       218       127        60
OIR    2025250     91400   19.7600 -114.4400       8.6       218       126        60
OIR    2025250     91400   19.7600 -114.4500       8.5       218       126        60
OIR    2025250     91400   19.7600 -114.4600       8.5       218       125        60
OIR    2025250     91400   19.7600 -114.4700       8.4       218       125        60
OIR    2025250     91400   19.7600 -114.4800       8.1       216       124        60
OIR    2025250     91400   19.7600 -114.4900       7.6       213       124        60
OIR    2025250     91400   19.7600 -114.5000       7.0       208       125        60
OIR    2025250     91400   19.7600 -114.5100       6.5       203       124        60
OIR    2025250     91400   19.7600 -114.5200       6.1       198       124        60
OIR    2025250     91400   19.7600 -114.5300       5.8       193       124        60
OIR    2025250     91400   19.7600 -114.5400       5.6       189       124        60
OIR    2025250     91400   19.7600 -114.5500       5.4       185       125        60
OIR    2025250     91400   19.7600 -114.5600       5.4       182       125        60
OIR    2025250     91400   19.7600 -114.5700       5.4       181       125        60
OIR    2025250     91400   19.7600 -114.5800       5.4       179       125        60
OIR    2025250     91400   19.7600 -114.5900       5.4       177       126        60
OIR    2025250     91400   19.7600 -114.6000       5.5       176       126        60
OIR    2025250     91400   19.7600 -114.6100       5.7       174       128        60
OIR    2025250     91400   19.7600 -114.6200       5.9       173       129        60
OIR    2025250     91400   19.7600 -114.6300       6.0       172       129        60
OIR    2025250     91400   19.7600 -114.6400       6.1       172       130        60
OIR    2025250     91400   19.7600 -114.6500       6.1       172       131        60
OIR    2025250     91400   19.7600 -114.6600       6.1       171       133        60
OIR    2025250     91400   19.7600 -114.6700       6.2       171       136        60
OIR    2025250     91400   19.7600 -114.6800       6.2       171       139        60
OIR    2025250     91400   19.7600 -115.8300       6.5       177       140        60
OIR    2025250     91400   19.7600 -115.8400       6.6       175       139        60
OIR    2025250     91400   19.7600 -115.8500       6.8       173       142        60
OIR    2025250     91400   19.7600 -115.8700       7.2       169       141        60
OIR    2025250     91400   19.7600 -115.8800       7.4       167       138        60
OIR    2025250     91400   19.7600 -115.8900       7.6       166       138        60
OIR    2025250     91400   19.7600 -115.9000       7.7       166       138        60
OIR    2025250     91400   19.7600 -115.9100       7.8       166       138        60
OIR    2025250     91400   19.7600 -115.9200       7.9       166       138        60
OIR    2025250     91400   19.7600 -115.9300       8.0       166       140        60
OIR    2025250     91400   19.7600 -116.0400      11.0       174       139        60
OIR    2025250     91400   19.7600 -116.0500      11.1       175       138        60
OIR    2025250     91400   19.7600 -116.0600      11.2       175       137        60
OIR    2025250     91400   19.7600 -116.0700      11.3       175       137        60
OIR    2025250     91400   19.7600 -116.0800      11.3       175       136        60
OIR    2025250     91400   19.7600 -116.0900      11.4       175       136        60
OIR    2025250     91400   19.7600 -116.1000      11.4       175       137        60
OIR    2025250     91400   19.7600 -116.1100      11.4       176       139        60
OIR    2025250     91400   19.7600 -116.1200      11.4       176       142        60
OIR    2025250     91400   19.7600 -118.0100       4.1        47       138        60
OIR    2025250     91400   19.7600 -118.0200       4.2        50       140        60
OIR    2025250     91400   19.7600 -118.0300       4.3        52       140        60
OIR    2025250     91400   19.7600 -118.0400       4.5        54       139        60
OIR    2025250     91400   19.7600 -118.0500       4.7        56       139        60
OIR    2025250     91400   19.7600 -118.0600       4.8        58       141        60
OIR    2025250     91400   19.7600 -118.0700       4.9        58       142        60
OIR    2025250     91400   19.7600 -118.0800       4.9        59       141        60
OIR    2025250     91400   19.7600 -118.0900       5.0        59       141        60
OIR    2025250     91400   19.7600 -118.1000       5.0        60       139        60
OIR    2025250     91400   19.7600 -118.1100       5.1        61       138        60
OIR    2025250     91400   19.7600 -118.1200       5.2        62       139        60
OIR    2025250     91400   19.7600 -118.1300       5.2        64       141        60
OIR    2025250     91400   19.7500 -112.7600       8.8       128       137        60
OIR    2025250     91400   19.7500 -112.7700       9.2       133       137        60
OIR    2025250     91400   19.7500 -112.7800       9.4       136       136        60
OIR    2025250     91400   19.7500 -112.7900       9.4       140       135        60
OIR    2025250     91400   19.7500 -112.8000       9.3       142       134        60
OIR    2025250     91400   19.7500 -112.8100       9.1       145       134        60
OIR    2025250     91400   19.7500 -112.8200       9.0       147       135        60
OIR    2025250     91400   19.7500 -112.8300       9.1       151       136        60
OIR    2025250     91400   19.7500 -112.8400       8.9       154       135        60
OIR    2025250     91400   19.7500 -112.8500       8.7       159       134        60
OIR    2025250     91400   19.7500 -112.8600       8.3       163       134        60
OIR    2025250     91400   19.7500 -112.8700       8.1       166       134        60
OIR    2025250     91400   19.7500 -112.8800       8.0       168       134        60
OIR    2025250     91400   19.7500 -112.8900       7.9       168       133        60
OIR    2025250     91400   19.7500 -112.9000       7.9       168       133        60
OIR    2025250     91400   19.7500 -112.9100       7.9       168       132        60
OIR    2025250     91400   19.7500 -112.9200       7.9       168       131        60
OIR    2025250     91400   19.7500 -112.9300       7.9       168       131        60
OIR    2025250     91400   19.7500 -112.9400       7.9       169       131        60
OIR    2025250     91400   19.7500 -112.9500       7.9       169       131        60
OIR    2025250     91400   19.7500 -112.9600       7.9       169       130        60
OIR    2025250     91400   19.7500 -112.9700       7.9       169       130        60
OIR    2025250     91400   19.7500 -112.9800       7.9       169       129        60
OIR    2025250     91400   19.7500 -112.9900       7.9       169       128        60
OIR    2025250     91400   19.7500 -113.0000       7.9       169       127        60
OIR    2025250     91400   19.7500 -113.0100       7.9       169       125        60
OIR    2025250     91400   19.7500 -113.0200       7.8       169       124        60
OIR    2025250     91400   19.7500 -113.0300       7.8       169       122        60
OIR    2025250     91400   19.7500 -113.0400       7.8       169       120        60
OIR    2025250     91400   19.7500 -113.0500       7.8       169       117        60
OIR    2025250     91400   19.7500 -113.0600       7.8       169       116        60
OIR    2025250     91400   19.7500 -113.0700       7.8       169       117        60
OIR    2025250     91400   19.7500 -113.0800       7.8       169       119        60
OIR    2025250     91400   19.7500 -113.0900       7.8       169       119        60
OIR    2025250     91400   19.7500 -113.1000       7.8       169       119        60
OIR    2025250     91400   19.7500 -113.1100       7.8       169       119        60
OIR    2025250     91400   19.7500 -113.1200       7.8       169       117        60
OIR    2025250     91400   19.7500 -113.1300       7.8       169       117        60
OIR    2025250     91400   19.7500 -113.1400       7.8       169       117        60
OIR    2025250     91400   19.7500 -113.1500       7.8       169       117        60
OIR    2025250     91400   19.7500 -113.1600       7.8       169       117        60
OIR    2025250     91400   19.7500 -113.1700       7.8       169       117        60
OIR    2025250     91400   19.7500 -113.1800       7.8       169       116        60
OIR    2025250     91400   19.7500 -113.1900       7.8       168       116        60
OIR    2025250     91400   19.7500 -113.2000       7.9       168       115        60
OIR    2025250     91400   19.7500 -113.2100       7.9       168       113        60
OIR    2025250     91400   19.7500 -113.2200       7.9       168       111        60
OIR    2025250     91400   19.7500 -113.2300       7.9       168       111        60
OIR    2025250     91400   19.7500 -113.2400       7.9       168       110        60
OIR    2025250     91400   19.7500 -113.2500       7.9       168       111        60
OIR    2025250     91400   19.7500 -113.2600       8.0       168       112        60
OIR    2025250     91400   19.7500 -113.2700       8.0       168       112        60
OIR    2025250     91400   19.7500 -113.2800       8.0       168       111        60
OIR    2025250     91400   19.7500 -113.2900       8.0       168       110        60
OIR    2025250     91400   19.7500 -113.3000       8.1       168       109        60
OIR    2025250     91400   19.7500 -113.3100       8.1       168       108        60
OIR    2025250     91400   19.7500 -113.3200       8.1       168       107        60
OIR    2025250     91400   19.7500 -113.3300       8.1       168       105        60
OIR    2025250     91400   19.7500 -113.3400       8.1       168       104        60
OIR    2025250     91400   19.7500 -113.3500       8.1       168       104        60
OIR    2025250     91400   19.7500 -113.3600       8.1       168       103        60
OIR    2025250     91400   19.7500 -113.3700       8.1       168       103        60
OIR    2025250     91400   19.7500 -113.3800       8.1       168       103        60
OIR    2025250     91400   19.7500 -113.3900       8.2       168       103        60
OIR    2025250     91400   19.7500 -113.4000       8.2       168       103        60
OIR    2025250     91400   19.7500 -113.4100       8.2       168       103        60
OIR    2025250     91400   19.7500 -113.4200       8.2       168       104        60
OIR    2025250     91400   19.7500 -113.4300       8.2       168       104        60
OIR    2025250     91400   19.7500 -113.4400       8.3       168       104        60
OIR    2025250     91400   19.7500 -113.4500       8.3       168       103        60
OIR    2025250     91400   19.7500 -113.4600       8.3       168       103        60
OIR    2025250     91400   19.7500 -113.4700       8.3       168       104        60
OIR    2025250     91400   19.7500 -113.4800       8.3       168       104        60
OIR    2025250     91400   19.7500 -113.4900       8.3       168       104        60
OIR    2025250     91400   19.7500 -113.5000       8.3       168       104        60
OIR    2025250     91400   19.7500 -113.5100       8.4       168       105        60
OIR    2025250     91400   19.7500 -113.5200       8.4       168       107        60
OIR    2025250     91400   19.7500 -113.5300       8.4       168       105        60
OIR    2025250     91400   19.7500 -113.5400       8.4       168       104        60
OIR    2025250     91400   19.7500 -113.5500       8.4       169       104        60
OIR    2025250     91400   19.7500 -113.5600       8.4       169       104        60
OIR    2025250     91400   19.7500 -113.5700       8.4       169       104        60
OIR    2025250     91400   19.7500 -113.5800       8.4       169       105        60
OIR    2025250     91400   19.7500 -113.5900       8.5       170       107        60
OIR    2025250     91400   19.7500 -113.6000       8.5       170       107        60
OIR    2025250     91400   19.7500 -113.6100       8.5       170       107        60
OIR    2025250     91400   19.7500 -113.6200       8.6       171       107        60
OIR    2025250     91400   19.7500 -113.6300       8.6       171       105        60
OIR    2025250     91400   19.7500 -113.6400       8.6       172       104        60
OIR    2025250     91400   19.7500 -113.6500       8.6       172       104        60
OIR    2025250     91400   19.7500 -113.6600       8.6       173       104        60
OIR    2025250     91400   19.7500 -113.6700       8.6       173       104        60
OIR    2025250     91400   19.7500 -113.6800       8.7       174       104        60
OIR    2025250     91400   19.7500 -113.6900       8.7       174       104        60
OIR    2025250     91400   19.7500 -113.7000       8.7       174       104        60
OIR    2025250     91400   19.7500 -113.7100       8.7       175       104        60
OIR    2025250     91400   19.7500 -113.7200       8.8       175       104        60
OIR    2025250     91400   19.7500 -113.7300       8.8       175       104        60
OIR    2025250     91400   19.7500 -113.7400       8.8       175       104        60
OIR    2025250     91400   19.7500 -113.7500       8.8       175       104        60
OIR    2025250     91400   19.7500 -113.7600       8.8       175       104        60
OIR    2025250     91400   19.7500 -113.7700       8.8       175       104        60
OIR    2025250     91400   19.7500 -113.7800       8.9       175       104        60
OIR    2025250     91400   19.7500 -113.7900       8.9       176       104        60
OIR    2025250     91400   19.7500 -113.8000       8.9       176       104        60
OIR    2025250     91400   19.7500 -113.8100       8.9       176       104        60
OIR    2025250     91400   19.7500 -113.8200       8.9       176       104        60
OIR    2025250     91400   19.7500 -113.8300       9.0       176       104        60
OIR    2025250     91400   19.7500 -113.8400       9.0       176       104        60
OIR    2025250     91400   19.7500 -113.8500       9.0       176       104        60
OIR    2025250     91400   19.7500 -113.8600       9.0       177       104        60
OIR    2025250     91400   19.7500 -113.8700       9.0       177       104        60
OIR    2025250     91400   19.7500 -113.8800       9.0       177       104        60
OIR    2025250     91400   19.7500 -113.8900       9.1       177       104        60
OIR    2025250     91400   19.7500 -113.9000       9.1       178       104        60
OIR    2025250     91400   19.7500 -113.9100       9.1       178       104        60
OIR    2025250     91400   19.7500 -113.9200       9.1       178       104        60
OIR    2025250     91400   19.7500 -113.9300       9.1       178       104        60
OIR    2025250     91400   19.7500 -113.9400       9.1       178       104        60
OIR    2025250     91400   19.7500 -113.9500       9.1       178       104        60
OIR    2025250     91400   19.7500 -113.9600       9.1       178       104        60
OIR    2025250     91400   19.7500 -113.9700       9.1       178       104        60
OIR    2025250     91400   19.7500 -113.9800       9.1       178       104        60
OIR    2025250     91400   19.7500 -113.9900       9.1       178       104        60
OIR    2025250     91400   19.7500 -114.0000       9.1       179       104        60
OIR    2025250     91400   19.7500 -114.0100       9.1       179       105        60
OIR    2025250     91400   19.7500 -114.0200       9.1       179       108        60
OIR    2025250     91400   19.7500 -114.0300       9.1       179       109        60
OIR    2025250     91400   19.7500 -114.0400       9.1       179       109        60
OIR    2025250     91400   19.7500 -114.0500       9.1       180       109        60
OIR    2025250     91400   19.7500 -114.0600       9.1       182       109        60
OIR    2025250     91400   19.7500 -114.0700       9.2       184       108        60
OIR    2025250     91400   19.7500 -114.0800       9.3       185       108        60
OIR    2025250     91400   19.7500 -114.0900       9.4       186       108        60
OIR    2025250     91400   19.7500 -114.1000       9.4       187       108        60
OIR    2025250     91400   19.7500 -114.1100       9.4       187       108        60
OIR    2025250     91400   19.7500 -114.1200       9.4       189       109        60
OIR    2025250     91400   19.7500 -114.1300       9.3       190       109        60
OIR    2025250     91400   19.7500 -114.1400       9.2       192       110        60
OIR    2025250     91400   19.7500 -114.1500       9.2       193       112        60
OIR    2025250     91400   19.7500 -114.1600       9.1       194       114        60
OIR    2025250     91400   19.7500 -114.1700       9.0       194       114        60
OIR    2025250     91400   19.7500 -114.1800       8.9       195       114        60
OIR    2025250     91400   19.7500 -114.1900       8.9       196       114        60
OIR    2025250     91400   19.7500 -114.2000       8.8       197       113        60
OIR    2025250     91400   19.7500 -114.2100       8.7       197       113        60
OIR    2025250     91400   19.7500 -114.2200       8.7       198       114        60
OIR    2025250     91400   19.7500 -114.2300       8.6       200       116        60
OIR    2025250     91400   19.7500 -114.2400       8.6       204       116        60
OIR    2025250     91400   19.7500 -114.2500       8.6       207       116        60
OIR    2025250     91400   19.7500 -114.2600       8.6       211       116        60
OIR    2025250     91400   19.7500 -114.2700       8.6       214       116        60
OIR    2025250     91400   19.7500 -114.2800       8.6       215       116        60
OIR    2025250     91400   19.7500 -114.2900       8.6       216       116        60
OIR    2025250     91400   19.7500 -114.3000       8.6       217       115        60
OIR    2025250     91400   19.7500 -114.3100       8.6       218       116        60
OIR    2025250     91400   19.7500 -114.3200       8.6       218       116        60
OIR    2025250     91400   19.7500 -114.3300       8.6       218       116        60
OIR    2025250     91400   19.7500 -114.3400       8.6       218       116        60
OIR    2025250     91400   19.7500 -114.3500       8.6       218       117        60
OIR    2025250     91400   19.7500 -114.3600       8.6       219       120        60
OIR    2025250     91400   19.7500 -114.3700       8.6       219       123        60
OIR    2025250     91400   19.7500 -114.3800       8.6       219       124        60
OIR    2025250     91400   19.7500 -114.3900       8.6       219       125        60
OIR    2025250     91400   19.7500 -114.4000       8.6       219       126        60
OIR    2025250     91400   19.7500 -114.4100       8.6       219       127        60
OIR    2025250     91400   19.7500 -114.4200       8.6       219       127        60
OIR    2025250     91400   19.7500 -114.4300       8.6       219       127        60
OIR    2025250     91400   19.7500 -114.4400       8.6       218       127        60
OIR    2025250     91400   19.7500 -114.4500       8.5       218       126        60
OIR    2025250     91400   19.7500 -114.4600       8.5       218       126        60
OIR    2025250     91400   19.7500 -114.4700       8.4       218       126        60
OIR    2025250     91400   19.7500 -114.4800       8.2       216       125        60
OIR    2025250     91400   19.7500 -114.4900       7.6       213       125        60
OIR    2025250     91400   19.7500 -114.5000       6.9       207       125        60
OIR    2025250     91400   19.7500 -114.5100       6.4       202       125        60
OIR    2025250     91400   19.7500 -114.5200       6.1       197       125        60
OIR    2025250     91400   19.7500 -114.5300       5.8       192       125        60
OIR    2025250     91400   19.7500 -114.5400       5.7       188       125        60
OIR    2025250     91400   19.7500 -114.5500       5.6       184       126        60
OIR    2025250     91400   19.7500 -114.5600       5.5       182       125        60
OIR    2025250     91400   19.7500 -114.5700       5.5       180       125        60
OIR    2025250     91400   19.7500 -114.5800       5.5       178       126        60
OIR    2025250     91400   19.7500 -114.5900       5.6       176       126        60
OIR    2025250     91400   19.7500 -114.6000       5.7       175       126        60
OIR    2025250     91400   19.7500 -114.6100       5.8       173       127        60
OIR    2025250     91400   19.7500 -114.6200       6.0       172       128        60
OIR    2025250     91400   19.7500 -114.6300       6.1       172       129        60
OIR    2025250     91400   19.7500 -114.6400       6.2       172       130        60
OIR    2025250     91400   19.7500 -114.6500       6.2       171       131        60
OIR    2025250     91400   19.7500 -114.6600       6.2       171       131        60
OIR    2025250     91400   19.7500 -114.6700       6.2       171       133        60
OIR    2025250     91400   19.7500 -114.6800       6.2       171       135        60
OIR    2025250     91400   19.7500 -114.6900       6.2       172       137        60
OIR    2025250     91400   19.7500 -115.8300       6.4       178       142        60
OIR    2025250     91400   19.7500 -115.8400       6.5       177       140        60
OIR    2025250     91400   19.7500 -115.8500       6.7       176       141        60
OIR    2025250     91400   19.7500 -115.8600       6.9       173       142        60
OIR    2025250     91400   19.7500 -115.8700       7.1       171       140        60
OIR    2025250     91400   19.7500 -115.8800       7.3       170       138        60
OIR    2025250     91400   19.7500 -115.8900       7.5       168       137        60
OIR    2025250     91400   19.7500 -115.9000       7.7       167       137        60
OIR    2025250     91400   19.7500 -115.9100       7.8       166       137        60
OIR    2025250     91400   19.7500 -115.9200       7.9       166       137        60
OIR    2025250     91400   19.7500 -115.9300       8.0       166       137        60
OIR    2025250     91400   19.7500 -115.9400       8.1       166       141        60
OIR    2025250     91400   19.7500 -116.0300      10.9       174       142        60
OIR    2025250     91400   19.7500 -116.0400      11.0       174       137        60
OIR    2025250     91400   19.7500 -116.0500      11.1       175       137        60
OIR    2025250     91400   19.7500 -116.0600      11.2       175       137        60
OIR    2025250     91400   19.7500 -116.0700      11.3       175       137        60
OIR    2025250     91400   19.7500 -116.0800      11.3       175       137        60
OIR    2025250     91400   19.7500 -116.0900      11.3       176       137        60
OIR    2025250     91400   19.7500 -116.1000      11.4       176       137        60
OIR    2025250     91400   19.7500 -116.1100      11.4       176       137        60
OIR    2025250     91400   19.7500 -116.1200      11.4       176       138        60
OIR    2025250     91400   19.7500 -116.1300      11.4       176       140        60
OIR    2025250     91400   19.7500 -116.1400      11.4       176       141        60
OIR    2025250     91400   19.7500 -116.1500      11.4       176       142        60
OIR    2025250     91400   19.7500 -118.0100       4.0        48       138        60
OIR    2025250     91400   19.7500 -118.0200       4.2        51       140        60
OIR    2025250     91400   19.7500 -118.0300       4.4        53       140        60
OIR    2025250     91400   19.7500 -118.0400       4.5        55       139        60
OIR    2025250     91400   19.7500 -118.0500       4.7        57       138        60
OIR    2025250     91400   19.7500 -118.0600       4.9        58       139        60
OIR    2025250     91400   19.7500 -118.0700       4.9        59       140        60
OIR    2025250     91400   19.7500 -118.0800       5.0        59       141        60
OIR    2025250     91400   19.7500 -118.0900       5.0        60       141        60
OIR    2025250     91400   19.7500 -118.1000       5.1        61       140        60
OIR    2025250     91400   19.7500 -118.1100       5.2        62       138        60
OIR    2025250     91400   19.7500 -118.1200       5.4        64       138        60
OIR    2025250     91400   19.7500 -118.1300       5.6        67       139        60
OIR    2025250     91400   19.7500 -118.1400       5.6        68       141        60
OIR    2025250     91400   19.7400 -112.7600       8.8       132       139        60
OIR    2025250     91400   19.7400 -112.7700       9.0       136       137        60
OIR    2025250     91400   19.7400 -112.7800       9.1       139       136        60
OIR    2025250     91400   19.7400 -112.7900       9.0       142       135        60
OIR    2025250     91400   19.7400 -112.8000       8.8       146       134        60
OIR    2025250     91400   19.7400 -112.8100       8.6       149       135        60
OIR    2025250     91400   19.7400 -112.8200       8.5       153       135        60
OIR    2025250     91400   19.7400 -112.8300       8.5       158       136        60
OIR    2025250     91400   19.7400 -112.8400       8.4       161       135        60
OIR    2025250     91400   19.7400 -112.8500       8.1       165       134        60
OIR    2025250     91400   19.7400 -112.8600       8.0       167       134        60
OIR    2025250     91400   19.7400 -112.8700       7.9       168       134        60
OIR    2025250     91400   19.7400 -112.8800       7.9       169       134        60
OIR    2025250     91400   19.7400 -112.8900       7.9       169       133        60
OIR    2025250     91400   19.7400 -112.9000       7.9       169       133        60
OIR    2025250     91400   19.7400 -112.9100       7.9       169       132        60
OIR    2025250     91400   19.7400 -112.9200       7.9       169       132        60
OIR    2025250     91400   19.7400 -112.9300       7.9       169       131        60
OIR    2025250     91400   19.7400 -112.9400       7.9       169       131        60
OIR    2025250     91400   19.7400 -112.9500       7.9       169       131        60
OIR    2025250     91400   19.7400 -112.9600       7.9       169       130        60
OIR    2025250     91400   19.7400 -112.9700       7.9       169       130        60
OIR    2025250     91400   19.7400 -112.9800       7.9       169       129        60
OIR    2025250     91400   19.7400 -112.9900       7.9       169       128        60
OIR    2025250     91400   19.7400 -113.0000       7.9       169       126        60
OIR    2025250     91400   19.7400 -113.0100       7.9       169       124        60
OIR    2025250     91400   19.7400 -113.0200       7.9       169       123        60
OIR    2025250     91400   19.7400 -113.0300       7.8       169       121        60
OIR    2025250     91400   19.7400 -113.0400       7.8       169       119        60
OIR    2025250     91400   19.7400 -113.0500       7.8       169       117        60
OIR    2025250     91400   19.7400 -113.0600       7.8       169       117        60
OIR    2025250     91400   19.7400 -113.0700       7.8       169       117        60
OIR    2025250     91400   19.7400 -113.0800       7.8       169       117        60
OIR    2025250     91400   19.7400 -113.0900       7.8       169       119        60
OIR    2025250     91400   19.7400 -113.1000       7.8       169       121        60
OIR    2025250     91400   19.7400 -113.1100       7.8       169       122        60
OIR    2025250     91400   19.7400 -113.1200       7.8       169       121        60
OIR    2025250     91400   19.7400 -113.1300       7.8       169       120        60
OIR    2025250     91400   19.7400 -113.1400       7.8       169       120        60
OIR    2025250     91400   19.7400 -113.1500       7.8       169       121        60
OIR    2025250     91400   19.7400 -113.1600       7.8       169       117        60
OIR    2025250     91400   19.7400 -113.1700       7.8       169       116        60
OIR    2025250     91400   19.7400 -113.1800       7.8       169       115        60
OIR    2025250     91400   19.7400 -113.1900       7.8       169       115        60
OIR    2025250     91400   19.7400 -113.2000       7.8       169       114        60
OIR    2025250     91400   19.7400 -113.2100       7.8       169       114        60
OIR    2025250     91400   19.7400 -113.2200       7.9       169       113        60
OIR    2025250     91400   19.7400 -113.2300       7.9       169       112        60
OIR    2025250     91400   19.7400 -113.2400       7.9       168       111        60
OIR    2025250     91400   19.7400 -113.2500       7.9       168       111        60
OIR    2025250     91400   19.7400 -113.2600       7.9       168       112        60
OIR    2025250     91400   19.7400 -113.2700       8.0       168       112        60
OIR    2025250     91400   19.7400 -113.2800       8.0       168       111        60
OIR    2025250     91400   19.7400 -113.2900       8.0       168       110        60
OIR    2025250     91400   19.7400 -113.3000       8.0       168       109        60
OIR    2025250     91400   19.7400 -113.3100       8.1       168       108        60
OIR    2025250     91400   19.7400 -113.3200       8.1       168       107        60
OIR    2025250     91400   19.7400 -113.3300       8.1       168       105        60
OIR    2025250     91400   19.7400 -113.3400       8.1       168       104        60
OIR    2025250     91400   19.7400 -113.3500       8.1       168       104        60
OIR    2025250     91400   19.7400 -113.3600       8.1       168       104        60
OIR    2025250     91400   19.7400 -113.3700       8.1       168       103        60
OIR    2025250     91400   19.7400 -113.3800       8.1       168       103        60
OIR    2025250     91400   19.7400 -113.3900       8.1       168       103        60
OIR    2025250     91400   19.7400 -113.4000       8.2       168       103        60
OIR    2025250     91400   19.7400 -113.4100       8.2       168       103        60
OIR    2025250     91400   19.7400 -113.4200       8.2       168       103        60
OIR    2025250     91400   19.7400 -113.4300       8.2       168       104        60
OIR    2025250     91400   19.7400 -113.4400       8.2       168       103        60
OIR    2025250     91400   19.7400 -113.4500       8.3       168       103        60
OIR    2025250     91400   19.7400 -113.4600       8.3       168       103        60
OIR    2025250     91400   19.7400 -113.4700       8.3       168       103        60
OIR    2025250     91400   19.7400 -113.4800       8.3       168       104        60
OIR    2025250     91400   19.7400 -113.4900       8.3       168       104        60
OIR    2025250     91400   19.7400 -113.5000       8.3       168       104        60
OIR    2025250     91400   19.7400 -113.5100       8.3       168       104        60
OIR    2025250     91400   19.7400 -113.5200       8.4       168       107        60
OIR    2025250     91400   19.7400 -113.5300       8.4       169       105        60
OIR    2025250     91400   19.7400 -113.5400       8.4       169       105        60
OIR    2025250     91400   19.7400 -113.5500       8.4       169       104        60
OIR    2025250     91400   19.7400 -113.5600       8.4       169       104        60
OIR    2025250     91400   19.7400 -113.5700       8.4       169       104        60
OIR    2025250     91400   19.7400 -113.5800       8.4       169       105        60
OIR    2025250     91400   19.7400 -113.5900       8.4       170       107        60
OIR    2025250     91400   19.7400 -113.6000       8.5       170       108        60
OIR    2025250     91400   19.7400 -113.6100       8.5       170       108        60
OIR    2025250     91400   19.7400 -113.6200       8.5       171       108        60
OIR    2025250     91400   19.7400 -113.6300       8.5       172       107        60
OIR    2025250     91400   19.7400 -113.6400       8.6       172       105        60
OIR    2025250     91400   19.7400 -113.6500       8.6       173       105        60
OIR    2025250     91400   19.7400 -113.6600       8.6       173       105        60
OIR    2025250     91400   19.7400 -113.6700       8.6       174       105        60
OIR    2025250     91400   19.7400 -113.6800       8.7       174       105        60
OIR    2025250     91400   19.7400 -113.6900       8.7       174       105        60
OIR    2025250     91400   19.7400 -113.7000       8.7       174       104        60
OIR    2025250     91400   19.7400 -113.7100       8.7       175       104        60
OIR    2025250     91400   19.7400 -113.7200       8.8       175       104        60
OIR    2025250     91400   19.7400 -113.7300       8.8       175       104        60
OIR    2025250     91400   19.7400 -113.7400       8.8       175       104        60
OIR    2025250     91400   19.7400 -113.7500       8.8       175       104        60
OIR    2025250     91400   19.7400 -113.7600       8.8       175       104        60
OIR    2025250     91400   19.7400 -113.7700       8.8       175       104        60
OIR    2025250     91400   19.7400 -113.7800       8.9       176       104        60
OIR    2025250     91400   19.7400 -113.7900       8.9       176       104        60
OIR    2025250     91400   19.7400 -113.8000       8.9       176       105        60
OIR    2025250     91400   19.7400 -113.8100       8.9       176       105        60
OIR    2025250     91400   19.7400 -113.8200       8.9       176       104        60
OIR    2025250     91400   19.7400 -113.8300       9.0       176       105        60
OIR    2025250     91400   19.7400 -113.8400       9.0       176       107        60
OIR    2025250     91400   19.7400 -113.8500       9.0       177       107        60
OIR    2025250     91400   19.7400 -113.8600       9.0       177       107        60
OIR    2025250     91400   19.7400 -113.8700       9.0       177       107        60
OIR    2025250     91400   19.7400 -113.8800       9.0       177       107        60
OIR    2025250     91400   19.7400 -113.8900       9.1       178       107        60
OIR    2025250     91400   19.7400 -113.9000       9.1       178       107        60
OIR    2025250     91400   19.7400 -113.9100       9.1       178       105        60
OIR    2025250     91400   19.7400 -113.9200       9.1       178       105        60
OIR    2025250     91400   19.7400 -113.9300       9.1       178       105        60
OIR    2025250     91400   19.7400 -113.9400       9.1       178       105        60
OIR    2025250     91400   19.7400 -113.9500       9.1       178       105        60
OIR    2025250     91400   19.7400 -113.9600       9.1       178       105        60
OIR    2025250     91400   19.7400 -113.9700       9.1       178       104        60
OIR    2025250     91400   19.7400 -113.9800       9.1       179       104        60
OIR    2025250     91400   19.7400 -113.9900       9.1       179       104        60
OIR    2025250     91400   19.7400 -114.0000       9.1       179       105        60
OIR    2025250     91400   19.7400 -114.0100       9.1       179       107        60
OIR    2025250     91400   19.7400 -114.0200       9.1       179       108        60
OIR    2025250     91400   19.7400 -114.0300       9.1       179       109        60
OIR    2025250     91400   19.7400 -114.0400       9.1       179       109        60
OIR    2025250     91400   19.7400 -114.0500       9.1       181       109        60
OIR    2025250     91400   19.7400 -114.0600       9.1       182       109        60
OIR    2025250     91400   19.7400 -114.0700       9.1       184       109        60
OIR    2025250     91400   19.7400 -114.0800       9.2       185       108        60
OIR    2025250     91400   19.7400 -114.0900       9.3       186       108        60
OIR    2025250     91400   19.7400 -114.1000       9.3       187       108        60
OIR    2025250     91400   19.7400 -114.1100       9.3       187       109        60
OIR    2025250     91400   19.7400 -114.1200       9.3       189       109        60
OIR    2025250     91400   19.7400 -114.1300       9.2       190       110        60
OIR    2025250     91400   19.7400 -114.1400       9.2       191       110        60
OIR    2025250     91400   19.7400 -114.1500       9.1       193       112        60
OIR    2025250     91400   19.7400 -114.1600       9.0       194       113        60
OIR    2025250     91400   19.7400 -114.1700       9.0       194       114        60
OIR    2025250     91400   19.7400 -114.1800       8.9       195       114        60
OIR    2025250     91400   19.7400 -114.1900       8.8       196       114        60
OIR    2025250     91400   19.7400 -114.2000       8.7       197       113        60
OIR    2025250     91400   19.7400 -114.2100       8.7       197       112        60
OIR    2025250     91400   19.7400 -114.2200       8.6       198       113        60
OIR    2025250     91400   19.7400 -114.2300       8.6       200       115        60
OIR    2025250     91400   19.7400 -114.2400       8.6       203       116        60
OIR    2025250     91400   19.7400 -114.2500       8.5       206       116        60
OIR    2025250     91400   19.7400 -114.2600       8.5       210       116        60
OIR    2025250     91400   19.7400 -114.2700       8.5       213       116        60
OIR    2025250     91400   19.7400 -114.2800       8.5       215       116        60
OIR    2025250     91400   19.7400 -114.2900       8.6       216       116        60
OIR    2025250     91400   19.7400 -114.3000       8.6       217       116        60
OIR    2025250     91400   19.7400 -114.3100       8.6       218       116        60
OIR    2025250     91400   19.7400 -114.3200       8.6       218       116        60
OIR    2025250     91400   19.7400 -114.3300       8.6       218       117        60
OIR    2025250     91400   19.7400 -114.3400       8.6       218       117        60
OIR    2025250     91400   19.7400 -114.3500       8.6       219       117        60
OIR    2025250     91400   19.7400 -114.3600       8.6       219       120        60
OIR    2025250     91400   19.7400 -114.3700       8.6       219       122        60
OIR    2025250     91400   19.7400 -114.3800       8.6       219       123        60
OIR    2025250     91400   19.7400 -114.3900       8.6       219       125        60
OIR    2025250     91400   19.7400 -114.4000       8.6       219       126        60
OIR    2025250     91400   19.7400 -114.4100       8.6       219       127        60
OIR    2025250     91400   19.7400 -114.4200       8.6       219       128        60
OIR    2025250     91400   19.7400 -114.4300       8.6       219       127        60
OIR    2025250     91400   19.7400 -114.4400       8.6       219       127        60
OIR    2025250     91400   19.7400 -114.4500       8.6       218       127        60
OIR    2025250     91400   19.7400 -114.4600       8.5       218       126        60
OIR    2025250     91400   19.7400 -114.4700       8.5       218       126        60
OIR    2025250     91400   19.7400 -114.4800       8.2       216       126        60
OIR    2025250     91400   19.7400 -114.4900       7.7       213       126        60
OIR    2025250     91400   19.7400 -114.5000       7.0       207       125        60
OIR    2025250     91400   19.7400 -114.5100       6.4       202       125        60
OIR    2025250     91400   19.7400 -114.5200       6.1       196       126        60
OIR    2025250     91400   19.7400 -114.5300       5.9       191       126        60
OIR    2025250     91400   19.7400 -114.5400       5.7       187       127        60
OIR    2025250     91400   19.7400 -114.5500       5.7       184       127        60
OIR    2025250     91400   19.7400 -114.5600       5.6       181       127        60
OIR    2025250     91400   19.7400 -114.5700       5.6       179       126        60
OIR    2025250     91400   19.7400 -114.5800       5.6       178       126        60
OIR    2025250     91400   19.7400 -114.5900       5.7       176       126        60
OIR    2025250     91400   19.7400 -114.6000       5.8       174       127        60
OIR    2025250     91400   19.7400 -114.6100       6.0       173       128        60
OIR    2025250     91400   19.7400 -114.6200       6.1       172       129        60
OIR    2025250     91400   19.7400 -114.6300       6.1       172       130        60
OIR    2025250     91400   19.7400 -114.6400       6.2       171       131        60
OIR    2025250     91400   19.7400 -114.6500       6.2       171       132        60
OIR    2025250     91400   19.7400 -114.6600       6.2       171       133        60
OIR    2025250     91400   19.7400 -114.6700       6.2       171       134        60
OIR    2025250     91400   19.7400 -114.6800       6.2       171       136        60
OIR    2025250     91400   19.7400 -114.6900       6.1       172       138        60
OIR    2025250     91400   19.7400 -115.8500       6.7       178       141        60
OIR    2025250     91400   19.7400 -115.8600       6.9       176       139        60
OIR    2025250     91400   19.7400 -115.8700       7.1       174       139        60
OIR    2025250     91400   19.7400 -115.8800       7.2       172       139        60
OIR    2025250     91400   19.7400 -115.8900       7.5       170       138        60
OIR    2025250     91400   19.7400 -115.9000       7.7       169       137        60
OIR    2025250     91400   19.7400 -115.9100       7.8       168       136        60
OIR    2025250     91400   19.7400 -115.9200       7.9       167       136        60
OIR    2025250     91400   19.7400 -115.9300       8.0       167       136        60
OIR    2025250     91400   19.7400 -115.9400       8.1       167       138        60
OIR    2025250     91400   19.7400 -115.9500       8.4       167       140        60
OIR    2025250     91400   19.7400 -115.9600       8.8       168       142        60
OIR    2025250     91400   19.7400 -116.0300      10.8       174       142        60
OIR    2025250     91400   19.7400 -116.0400      11.0       175       138        60
OIR    2025250     91400   19.7400 -116.0500      11.1       175       138        60
OIR    2025250     91400   19.7400 -116.0600      11.2       175       139        60
OIR    2025250     91400   19.7400 -116.0700      11.2       176       139        60
OIR    2025250     91400   19.7400 -116.0800      11.3       176       138        60
OIR    2025250     91400   19.7400 -116.0900      11.3       176       138        60
OIR    2025250     91400   19.7400 -116.1000      11.3       176       138        60
OIR    2025250     91400   19.7400 -116.1100      11.3       176       138        60
OIR    2025250     91400   19.7400 -116.1200      11.4       176       139        60
OIR    2025250     91400   19.7400 -116.1300      11.4       176       141        60
OIR    2025250     91400   19.7400 -116.1400      11.4       176       141        60
OIR    2025250     91400   19.7400 -116.1500      11.4       176       141        60
OIR    2025250     91400   19.7400 -118.0100       4.0        49       138        60
OIR    2025250     91400   19.7400 -118.0200       4.2        52       139        60
OIR    2025250     91400   19.7400 -118.0300       4.4        54       140        60
OIR    2025250     91400   19.7400 -118.0400       4.6        56       138        60
OIR    2025250     91400   19.7400 -118.0500       4.8        58       137        60
OIR    2025250     91400   19.7400 -118.0600       4.9        59       137        60
OIR    2025250     91400   19.7400 -118.0700       5.0        59       138        60
OIR    2025250     91400   19.7400 -118.0800       5.0        59       139        60
OIR    2025250     91400   19.7400 -118.0900       5.1        60       139        60
OIR    2025250     91400   19.7400 -118.1000       5.2        61       139        60
OIR    2025250     91400   19.7400 -118.1100       5.5        63       138        60
OIR    2025250     91400   19.7400 -118.1200       5.7        66       138        60
OIR    2025250     91400   19.7400 -118.1300       5.9        68       140        60
OIR    2025250     91400   19.7400 -118.1400       6.0        69       141        60
OIR    2025250     91400   19.7300 -112.7700       8.9       140       138        60
OIR    2025250     91400   19.7300 -112.7800       8.9       143       136        60
OIR    2025250     91400   19.7300 -112.7900       8.7       147       135        60
OIR    2025250     91400   19.7300 -112.8000       8.5       151       135        60
OIR    2025250     91400   19.7300 -112.8100       8.3       156       135        60
OIR    2025250     91400   19.7300 -112.8200       8.2       160       135        60
OIR    2025250     91400   19.7300 -112.8300       8.1       163       136        60
OIR    2025250     91400   19.7300 -112.8400       8.0       166       135        60
OIR    2025250     91400   19.7300 -112.8500       7.9       168       134        60
OIR    2025250     91400   19.7300 -112.8600       7.9       168       134        60
OIR    2025250     91400   19.7300 -112.8700       7.9       169       134        60
OIR    2025250     91400   19.7300 -112.8800       7.9       169       134        60
OIR    2025250     91400   19.7300 -112.8900       7.9       169       133        60
OIR    2025250     91400   19.7300 -112.9000       7.9       169       132        60
OIR    2025250     91400   19.7300 -112.9100       7.9       169       132        60
OIR    2025250     91400   19.7300 -112.9200       7.9       169       132        60
OIR    2025250     91400   19.7300 -112.9300       7.9       169       131        60
OIR    2025250     91400   19.7300 -112.9400       7.9       169       131        60
OIR    2025250     91400   19.7300 -112.9500       7.9       169       130        60
OIR    2025250     91400   19.7300 -112.9600       7.9       169       129        60
OIR    2025250     91400   19.7300 -112.9700       7.9       169       128        60
OIR    2025250     91400   19.7300 -112.9800       7.9       169       127        60
OIR    2025250     91400   19.7300 -112.9900       7.9       169       126        60
OIR    2025250     91400   19.7300 -113.0000       7.9       169       125        60
OIR    2025250     91400   19.7300 -113.0100       7.9       169       123        60
OIR    2025250     91400   19.7300 -113.0200       7.9       169       122        60
OIR    2025250     91400   19.7300 -113.0300       7.9       169       122        60
OIR    2025250     91400   19.7300 -113.0400       7.8       169       122        60
OIR    2025250     91400   19.7300 -113.0500       7.8       169       120        60
OIR    2025250     91400   19.7300 -113.0600       7.8       169       117        60
OIR    2025250     91400   19.7300 -113.0700       7.8       169       117        60
OIR    2025250     91400   19.7300 -113.0800       7.8       169       119        60
OIR    2025250     91400   19.7300 -113.0900       7.8       169       119        60
OIR    2025250     91400   19.7300 -113.1000       7.8       169       119        60
OIR    2025250     91400   19.7300 -113.1100       7.8       169       119        60
OIR    2025250     91400   19.7300 -113.1200       7.8       169       120        60
OIR    2025250     91400   19.7300 -113.1300       7.8       169       121        60
OIR    2025250     91400   19.7300 -113.1400       7.8       169       121        60
OIR    2025250     91400   19.7300 -113.1500       7.8       169       121        60
OIR    2025250     91400   19.7300 -113.1600       7.8       169       119        60
OIR    2025250     91400   19.7300 -113.1700       7.8       169       116        60
OIR    2025250     91400   19.7300 -113.1800       7.8       169       115        60
OIR    2025250     91400   19.7300 -113.1900       7.8       169       114        60
OIR    2025250     91400   19.7300 -113.2000       7.8       169       114        60
OIR    2025250     91400   19.7300 -113.2100       7.8       169       113        60
OIR    2025250     91400   19.7300 -113.2200       7.8       169       113        60
OIR    2025250     91400   19.7300 -113.2300       7.8       169       112        60
OIR    2025250     91400   19.7300 -113.2400       7.9       169       111        60
OIR    2025250     91400   19.7300 -113.2500       7.9       169       111        60
OIR    2025250     91400   19.7300 -113.2600       7.9       169       111        60
OIR    2025250     91400   19.7300 -113.2700       8.0       169       112        60
OIR    2025250     91400   19.7300 -113.2800       8.0       169       111        60
OIR    2025250     91400   19.7300 -113.2900       8.0       169       110        60
OIR    2025250     91400   19.7300 -113.3000       8.0       169       109        60
OIR    2025250     91400   19.7300 -113.3100       8.1       168       108        60
OIR    2025250     91400   19.7300 -113.3200       8.1       168       105        60
OIR    2025250     91400   19.7300 -113.3300       8.1       169       105        60
OIR    2025250     91400   19.7300 -113.3400       8.1       169       104        60
OIR    2025250     91400   19.7300 -113.3500       8.1       169       104        60
OIR    2025250     91400   19.7300 -113.3600       8.1       169       104        60
OIR    2025250     91400   19.7300 -113.3700       8.1       169       104        60
OIR    2025250     91400   19.7300 -113.3800       8.1       169       103        60
OIR    2025250     91400   19.7300 -113.3900       8.1       169       103        60
OIR    2025250     91400   19.7300 -113.4000       8.1       169       103        60
OIR    2025250     91400   19.7300 -113.4100       8.2       169       103        60
OIR    2025250     91400   19.7300 -113.4200       8.2       169       103        60
OIR    2025250     91400   19.7300 -113.4300       8.2       169       103        60
OIR    2025250     91400   19.7300 -113.4400       8.2       169       103        60
OIR    2025250     91400   19.7300 -113.4500       8.3       168       103        60
OIR    2025250     91400   19.7300 -113.4600       8.3       168       103        60
OIR    2025250     91400   19.7300 -113.4700       8.3       168       103        60
OIR    2025250     91400   19.7300 -113.4800       8.3       168       103        60
OIR    2025250     91400   19.7300 -113.4900       8.3       168       103        60
OIR    2025250     91400   19.7300 -113.5000       8.3       168       103        60
OIR    2025250     91400   19.7300 -113.5100       8.3       168       104        60
OIR    2025250     91400   19.7300 -113.5200       8.4       169       105        60
OIR    2025250     91400   19.7300 -113.5300       8.4       169       105        60
OIR    2025250     91400   19.7300 -113.5400       8.4       169       104        60
OIR    2025250     91400   19.7300 -113.5500       8.4       169       104        60
OIR    2025250     91400   19.7300 -113.5600       8.4       169       104        60
OIR    2025250     91400   19.7300 -113.5700       8.4       169       104        60
OIR    2025250     91400   19.7300 -113.5800       8.4       170       105        60
OIR    2025250     91400   19.7300 -113.5900       8.4       170       107        60
OIR    2025250     91400   19.7300 -113.6000       8.4       170       107        60
OIR    2025250     91400   19.7300 -113.6100       8.4       171       107        60
OIR    2025250     91400   19.7300 -113.6200       8.5       172       107        60
OIR    2025250     91400   19.7300 -113.6300       8.5       172       105        60
OIR    2025250     91400   19.7300 -113.6400       8.6       173       105        60
OIR    2025250     91400   19.7300 -113.6500       8.6       173       104        60
OIR    2025250     91400   19.7300 -113.6600       8.6       174       104        60
OIR    2025250     91400   19.7300 -113.6700       8.6       174       104        60
OIR    2025250     91400   19.7300 -113.6800       8.7       174       104        60
OIR    2025250     91400   19.7300 -113.6900       8.7       174       104        60
OIR    2025250     91400   19.7300 -113.7000       8.7       175       104        60
OIR    2025250     91400   19.7300 -113.7100       8.7       175       104        60
OIR    2025250     91400   19.7300 -113.7200       8.8       175       104        60
OIR    2025250     91400   19.7300 -113.7300       8.8       175       103        60
OIR    2025250     91400   19.7300 -113.7400       8.8       175       104        60
OIR    2025250     91400   19.7300 -113.7500       8.8       175       104        60
OIR    2025250     91400   19.7300 -113.7600       8.8       175       104        60
OIR    2025250     91400   19.7300 -113.7700       8.9       176       104        60
OIR    2025250     91400   19.7300 -113.7800       8.9       176       104        60
OIR    2025250     91400   19.7300 -113.7900       8.9       176       105        60
OIR    2025250     91400   19.7300 -113.8000       8.9       176       105        60
OIR    2025250     91400   19.7300 -113.8100       8.9       176       105        60
OIR    2025250     91400   19.7300 -113.8200       8.9       176       105        60
OIR    2025250     91400   19.7300 -113.8300       9.0       176       105        60
OIR    2025250     91400   19.7300 -113.8400       9.0       177       107        60
OIR    2025250     91400   19.7300 -113.8500       9.0       177       108        60
OIR    2025250     91400   19.7300 -113.8600       9.0       177       108        60
OIR    2025250     91400   19.7300 -113.8700       9.0       177       108        60
OIR    2025250     91400   19.7300 -113.8800       9.0       177       108        60
OIR    2025250     91400   19.7300 -113.8900       9.1       178       108        60
OIR    2025250     91400   19.7300 -113.9000       9.1       178       107        60
OIR    2025250     91400   19.7300 -113.9100       9.1       178       107        60
OIR    2025250     91400   19.7300 -113.9200       9.1       178       107        60
OIR    2025250     91400   19.7300 -113.9300       9.1       178       107        60
OIR    2025250     91400   19.7300 -113.9400       9.1       178       107        60
OIR    2025250     91400   19.7300 -113.9500       9.1       178       107        60
OIR    2025250     91400   19.7300 -113.9600       9.1       178       105        60
OIR    2025250     91400   19.7300 -113.9700       9.1       179       105        60
OIR    2025250     91400   19.7300 -113.9800       9.1       179       105        60
OIR    2025250     91400   19.7300 -113.9900       9.1       179       105        60
OIR    2025250     91400   19.7300 -114.0000       9.1       179       107        60
OIR    2025250     91400   19.7300 -114.0100       9.1       179       108        60
OIR    2025250     91400   19.7300 -114.0200       9.1       179       108        60
OIR    2025250     91400   19.7300 -114.0300       9.1       179       109        60
OIR    2025250     91400   19.7300 -114.0400       9.0       179       109        60
OIR    2025250     91400   19.7300 -114.0500       9.0       180       109        60
OIR    2025250     91400   19.7300 -114.0600       9.1       182       109        60
OIR    2025250     91400   19.7300 -114.0700       9.1       184       109        60
OIR    2025250     91400   19.7300 -114.0800       9.1       185       109        60
OIR    2025250     91400   19.7300 -114.0900       9.2       186       109        60
OIR    2025250     91400   19.7300 -114.1000       9.2       187       109        60
OIR    2025250     91400   19.7300 -114.1100       9.2       187       110        60
OIR    2025250     91400   19.7300 -114.1200       9.2       189       110        60
OIR    2025250     91400   19.7300 -114.1300       9.2       190       110        60
OIR    2025250     91400   19.7300 -114.1400       9.1       191       111        60
OIR    2025250     91400   19.7300 -114.1500       9.1       192       112        60
OIR    2025250     91400   19.7300 -114.1600       9.0       193       113        60
OIR    2025250     91400   19.7300 -114.1700       8.9       194       114        60
OIR    2025250     91400   19.7300 -114.1800       8.8       195       114        60
OIR    2025250     91400   19.7300 -114.1900       8.7       196       113        60
OIR    2025250     91400   19.7300 -114.2000       8.6       197       112        60
OIR    2025250     91400   19.7300 -114.2100       8.6       197       111        60
OIR    2025250     91400   19.7300 -114.2200       8.6       198       113        60
OIR    2025250     91400   19.7300 -114.2300       8.5       199       114        60
OIR    2025250     91400   19.7300 -114.2400       8.5       201       115        60
OIR    2025250     91400   19.7300 -114.2500       8.5       205       115        60
OIR    2025250     91400   19.7300 -114.2600       8.5       209       114        60
OIR    2025250     91400   19.7300 -114.2700       8.5       212       115        60
OIR    2025250     91400   19.7300 -114.2800       8.5       214       116        60
OIR    2025250     91400   19.7300 -114.2900       8.5       216       116        60
OIR    2025250     91400   19.7300 -114.3000       8.6       217       116        60
OIR    2025250     91400   19.7300 -114.3100       8.6       218       116        60
OIR    2025250     91400   19.7300 -114.3200       8.6       218       116        60
OIR    2025250     91400   19.7300 -114.3300       8.6       218       117        60
OIR    2025250     91400   19.7300 -114.3400       8.6       218       117        60
OIR    2025250     91400   19.7300 -114.3500       8.6       219       117        60
OIR    2025250     91400   19.7300 -114.3600       8.6       219       119        60
OIR    2025250     91400   19.7300 -114.3700       8.6       219       120        60
OIR    2025250     91400   19.7300 -114.3800       8.6       219       122        60
OIR    2025250     91400   19.7300 -114.3900       8.6       219       123        60
OIR    2025250     91400   19.7300 -114.4000       8.6       219       124        60
OIR    2025250     91400   19.7300 -114.4100       8.6       219       125        60
OIR    2025250     91400   19.7300 -114.4200       8.6       219       126        60
OIR    2025250     91400   19.7300 -114.4300       8.6       219       127        60
OIR    2025250     91400   19.7300 -114.4400       8.6       219       127        60
OIR    2025250     91400   19.7300 -114.4500       8.6       218       126        60
OIR    2025250     91400   19.7300 -114.4600       8.5       218       126        60
OIR    2025250     91400   19.7300 -114.4700       8.5       218       126        60
OIR    2025250     91400   19.7300 -114.4800       8.3       217       126        60
OIR    2025250     91400   19.7300 -114.4900       7.8       213       126        60
OIR    2025250     91400   19.7300 -114.5000       7.0       207       126        60
OIR    2025250     91400   19.7300 -114.5100       6.5       201       125        60
OIR    2025250     91400   19.7300 -114.5200       6.2       196       126        60
OIR    2025250     91400   19.7300 -114.5300       5.9       191       127        60
OIR    2025250     91400   19.7300 -114.5400       5.8       187       127        60
OIR    2025250     91400   19.7300 -114.5500       5.7       184       127        60
OIR    2025250     91400   19.7300 -114.5600       5.7       181       127        60
OIR    2025250     91400   19.7300 -114.5700       5.7       179       127        60
OIR    2025250     91400   19.7300 -114.5800       5.8       177       127        60
OIR    2025250     91400   19.7300 -114.5900       5.8       175       127        60
OIR    2025250     91400   19.7300 -114.6000       5.9       173       128        60
OIR    2025250     91400   19.7300 -114.6100       6.0       172       128        60
OIR    2025250     91400   19.7300 -114.6200       6.1       172       129        60
OIR    2025250     91400   19.7300 -114.6300       6.2       171       131        60
OIR    2025250     91400   19.7300 -114.6400       6.2       171       132        60
OIR    2025250     91400   19.7300 -114.6500       6.2       171       133        60
OIR    2025250     91400   19.7300 -114.6600       6.2       171       135        60
OIR    2025250     91400   19.7300 -114.6700       6.2       171       136        60
OIR    2025250     91400   19.7300 -114.6800       6.2       171       137        60
OIR    2025250     91400   19.7300 -114.6900       6.2       173       138        60
OIR    2025250     91400   19.7300 -114.7000       6.4       178       140        60
OIR    2025250     91400   19.7300 -115.8500       6.6       179       141        60
OIR    2025250     91400   19.7300 -115.8600       6.8       179       139        60
OIR    2025250     91400   19.7300 -115.8700       7.0       177       138        60
OIR    2025250     91400   19.7300 -115.8800       7.2       175       137        60
OIR    2025250     91400   19.7300 -115.8900       7.4       173       137        60
OIR    2025250     91400   19.7300 -115.9000       7.7       171       136        60
OIR    2025250     91400   19.7300 -115.9100       7.8       170       134        60
OIR    2025250     91400   19.7300 -115.9200       8.0       169       134        60
OIR    2025250     91400   19.7300 -115.9300       8.1       169       135        60
OIR    2025250     91400   19.7300 -115.9400       8.3       169       136        60
OIR    2025250     91400   19.7300 -115.9500       8.6       169       137        60
OIR    2025250     91400   19.7300 -115.9600       9.0       170       138        60
OIR    2025250     91400   19.7300 -115.9700       9.4       170       140        60
OIR    2025250     91400   19.7300 -116.0400      10.9       175       140        60
OIR    2025250     91400   19.7300 -116.0500      11.0       175       139        60
OIR    2025250     91400   19.7300 -116.0600      11.1       175       140        60
OIR    2025250     91400   19.7300 -116.0700      11.2       176       140        60
OIR    2025250     91400   19.7300 -116.0800      11.3       176       139        60
OIR    2025250     91400   19.7300 -116.0900      11.3       176       139        60
OIR    2025250     91400   19.7300 -116.1000      11.3       176       139        60
OIR    2025250     91400   19.7300 -116.1100      11.3       176       140        60
OIR    2025250     91400   19.7300 -116.1200      11.3       176       141        60
OIR    2025250     91400   19.7300 -116.1300      11.3       176       142        60
OIR    2025250     91400   19.7300 -116.1400      11.4       176       142        60
OIR    2025250     91400   19.7300 -116.1500      11.4       176       141        60
OIR    2025250     91400   19.7300 -116.1600      11.4       176       141        60
OIR    2025250     91400   19.7300 -118.0100       4.0        51       138        60
OIR    2025250     91400   19.7300 -118.0200       4.2        54       138        60
OIR    2025250     91400   19.7300 -118.0300       4.4        55       138        60
OIR    2025250     91400   19.7300 -118.0400       4.6        57       137        60
OIR    2025250     91400   19.7300 -118.0500       4.8        58       137        60
OIR    2025250     91400   19.7300 -118.0600       4.9        59       137        60
OIR    2025250     91400   19.7300 -118.0700       5.0        59       137        60
OIR    2025250     91400   19.7300 -118.0800       5.1        60       138        60
OIR    2025250     91400   19.7300 -118.0900       5.2        61       139        60
OIR    2025250     91400   19.7300 -118.1000       5.4        63       139        60
OIR    2025250     91400   19.7300 -118.1100       5.8        65       138        60
OIR    2025250     91400   19.7300 -118.1200       6.0        68       137        60
OIR    2025250     91400   19.7300 -118.1300       6.1        69       139        60
OIR    2025250     91400   19.7300 -118.1400       6.2        70       140        60
OIR    2025250     91400   19.7300 -118.1500       6.2        70       142        60
OIR    2025250     91400   19.7200 -112.7600       8.6       142       140        60
OIR    2025250     91400   19.7200 -112.7700       8.8       144       138        60
OIR    2025250     91400   19.7200 -112.7800       8.7       148       136        60
OIR    2025250     91400   19.7200 -112.7900       8.5       152       135        60
OIR    2025250     91400   19.7200 -112.8000       8.3       157       136        60
OIR    2025250     91400   19.7200 -112.8100       8.2       161       136        60
OIR    2025250     91400   19.7200 -112.8200       8.1       164       136        60
OIR    2025250     91400   19.7200 -112.8300       8.0       167       136        60
OIR    2025250     91400   19.7200 -112.8400       7.9       168       135        60
OIR    2025250     91400   19.7200 -112.8500       7.9       169       135        60
OIR    2025250     91400   19.7200 -112.8600       7.9       169       134        60
OIR    2025250     91400   19.7200 -112.8700       7.9       169       134        60
OIR    2025250     91400   19.7200 -112.8800       7.9       169       134        60
OIR    2025250     91400   19.7200 -112.8900       7.9       169       133        60
OIR    2025250     91400   19.7200 -112.9000       7.9       169       132        60
OIR    2025250     91400   19.7200 -112.9100       7.9       169       133        60
OIR    2025250     91400   19.7200 -112.9200       7.9       169       133        60
OIR    2025250     91400   19.7200 -112.9300       7.9       169       132        60
OIR    2025250     91400   19.7200 -112.9400       7.9       169       132        60
OIR    2025250     91400   19.7200 -112.9500       7.9       169       131        60
OIR    2025250     91400   19.7200 -112.9600       7.9       169       129        60
OIR    2025250     91400   19.7200 -112.9700       7.9       169       128        60
OIR    2025250     91400   19.7200 -112.9800       7.9       169       126        60
OIR    2025250     91400   19.7200 -112.9900       7.9       169       125        60
OIR    2025250     91400   19.7200 -113.0000       7.9       169       124        60
OIR    2025250     91400   19.7200 -113.0100       7.9       169       122        60
OIR    2025250     91400   19.7200 -113.0200       7.9       169       121        60
OIR    2025250     91400   19.7200 -113.0300       7.9       169       122        60
OIR    2025250     91400   19.7200 -113.0400       7.8       169       123        60
OIR    2025250     91400   19.7200 -113.0500       7.8       169       121        60
OIR    2025250     91400   19.7200 -113.0600       7.8       169       119        60
OIR    2025250     91400   19.7200 -113.0700       7.8       169       117        60
OIR    2025250     91400   19.7200 -113.0800       7.8       169       120        60
OIR    2025250     91400   19.7200 -113.0900       7.8       169       119        60
OIR    2025250     91400   19.7200 -113.1000       7.8       170       117        60
OIR    2025250     91400   19.7200 -113.1100       7.8       170       116        60
OIR    2025250     91400   19.7200 -113.1200       7.8       170       117        60
OIR    2025250     91400   19.7200 -113.1300       7.8       170       120        60
OIR    2025250     91400   19.7200 -113.1400       7.8       170       121        60
OIR    2025250     91400   19.7200 -113.1500       7.8       170       121        60
OIR    2025250     91400   19.7200 -113.1600       7.8       170       120        60
OIR    2025250     91400   19.7200 -113.1700       7.8       170       116        60
OIR    2025250     91400   19.7200 -113.1800       7.8       170       115        60
OIR    2025250     91400   19.7200 -113.1900       7.8       170       115        60
OIR    2025250     91400   19.7200 -113.2000       7.8       169       114        60
OIR    2025250     91400   19.7200 -113.2100       7.8       169       113        60
OIR    2025250     91400   19.7200 -113.2200       7.8       169       113        60
OIR    2025250     91400   19.7200 -113.2300       7.8       169       113        60
OIR    2025250     91400   19.7200 -113.2400       7.9       169       112        60
OIR    2025250     91400   19.7200 -113.2500       7.9       169       111        60
OIR    2025250     91400   19.7200 -113.2600       7.9       169       111        60
OIR    2025250     91400   19.7200 -113.2700       8.0       169       110        60
OIR    2025250     91400   19.7200 -113.2800       8.0       169       109        60
OIR    2025250     91400   19.7200 -113.2900       8.0       169       109        60
OIR    2025250     91400   19.7200 -113.3000       8.0       169       108        60
OIR    2025250     91400   19.7200 -113.3100       8.0       169       107        60
OIR    2025250     91400   19.7200 -113.3200       8.1       169       107        60
OIR    2025250     91400   19.7200 -113.3300       8.1       169       105        60
OIR    2025250     91400   19.7200 -113.3400       8.1       169       104        60
OIR    2025250     91400   19.7200 -113.3500       8.1       169       104        60
OIR    2025250     91400   19.7200 -113.3600       8.1       169       104        60
OIR    2025250     91400   19.7200 -113.3700       8.1       169       103        60
OIR    2025250     91400   19.7200 -113.3800       8.1       169       103        60
OIR    2025250     91400   19.7200 -113.3900       8.1       169       103        60
OIR    2025250     91400   19.7200 -113.4000       8.1       169       103        60
OIR    2025250     91400   19.7200 -113.4100       8.1       169       103        60
OIR    2025250     91400   19.7200 -113.4200       8.2       169       103        60
OIR    2025250     91400   19.7200 -113.4300       8.2       169       103        60
OIR    2025250     91400   19.7200 -113.4400       8.2       169       103        60
OIR    2025250     91400   19.7200 -113.4500       8.2       169       103        60
OIR    2025250     91400   19.7200 -113.4600       8.3       169       103        60
OIR    2025250     91400   19.7200 -113.4700       8.3       169       103        60
OIR    2025250     91400   19.7200 -113.4800       8.3       169       103        60
OIR    2025250     91400   19.7200 -113.4900       8.3       169       103        60
OIR    2025250     91400   19.7200 -113.5000       8.3       169       103        60
OIR    2025250     91400   19.7200 -113.5100       8.3       169       104        60
OIR    2025250     91400   19.7200 -113.5200       8.3       169       104        60
OIR    2025250     91400   19.7200 -113.5300       8.3       169       104        60
OIR    2025250     91400   19.7200 -113.5400       8.4       169       104        60
OIR    2025250     91400   19.7200 -113.5500       8.4       169       104        60
OIR    2025250     91400   19.7200 -113.5600       8.4       169       104        60
OIR    2025250     91400   19.7200 -113.5700       8.4       169       104        60
OIR    2025250     91400   19.7200 -113.5800       8.4       170       105        60
OIR    2025250     91400   19.7200 -113.5900       8.4       170       105        60
OIR    2025250     91400   19.7200 -113.6000       8.4       171       107        60
OIR    2025250     91400   19.7200 -113.6100       8.4       171       107        60
OIR    2025250     91400   19.7200 -113.6200       8.5       172       107        60
OIR    2025250     91400   19.7200 -113.6300       8.5       173       105        60
OIR    2025250     91400   19.7200 -113.6400       8.5       173       104        60
OIR    2025250     91400   19.7200 -113.6500       8.6       174       104        60
OIR    2025250     91400   19.7200 -113.6600       8.6       174       103        60
OIR    2025250     91400   19.7200 -113.6700       8.6       174       103        60
OIR    2025250     91400   19.7200 -113.6800       8.7       174       103        60
OIR    2025250     91400   19.7200 -113.6900       8.7       175       103        60
OIR    2025250     91400   19.7200 -113.7000       8.7       175       103        60
OIR    2025250     91400   19.7200 -113.7100       8.7       175       103        60
OIR    2025250     91400   19.7200 -113.7200       8.8       175       103        60
OIR    2025250     91400   19.7200 -113.7300       8.8       175       103        60
OIR    2025250     91400   19.7200 -113.7400       8.8       175       104        60
OIR    2025250     91400   19.7200 -113.7500       8.8       175       104        60
OIR    2025250     91400   19.7200 -113.7600       8.8       176       104        60
OIR    2025250     91400   19.7200 -113.7700       8.9       176       104        60
OIR    2025250     91400   19.7200 -113.7800       8.9       176       104        60
OIR    2025250     91400   19.7200 -113.7900       8.9       176       104        60
OIR    2025250     91400   19.7200 -113.8000       8.9       176       105        60
OIR    2025250     91400   19.7200 -113.8100       8.9       176       105        60
OIR    2025250     91400   19.7200 -113.8200       9.0       176       105        60
OIR    2025250     91400   19.7200 -113.8300       9.0       177       105        60
OIR    2025250     91400   19.7200 -113.8400       9.0       177       107        60
OIR    2025250     91400   19.7200 -113.8500       9.0       177       107        60
OIR    2025250     91400   19.7200 -113.8600       9.0       177       107        60
OIR    2025250     91400   19.7200 -113.8700       9.0       177       107        60
OIR    2025250     91400   19.7200 -113.8800       9.0       178       107        60
OIR    2025250     91400   19.7200 -113.8900       9.1       178       107        60
OIR    2025250     91400   19.7200 -113.9000       9.1       178       105        60
OIR    2025250     91400   19.7200 -113.9100       9.1       178       107        60
OIR    2025250     91400   19.7200 -113.9200       9.1       178       107        60
OIR    2025250     91400   19.7200 -113.9300       9.1       178       105        60
OIR    2025250     91400   19.7200 -113.9400       9.1       178       104        60
OIR    2025250     91400   19.7200 -113.9500       9.1       178       104        60
OIR    2025250     91400   19.7200 -113.9600       9.1       179       105        60
OIR    2025250     91400   19.7200 -113.9700       9.1       179       105        60
OIR    2025250     91400   19.7200 -113.9800       9.1       179       104        60
OIR    2025250     91400   19.7200 -113.9900       9.1       179       104        60
OIR    2025250     91400   19.7200 -114.0000       9.1       179       105        60
OIR    2025250     91400   19.7200 -114.0100       9.1       179       107        60
OIR    2025250     91400   19.7200 -114.0200       9.0       179       108        60
OIR    2025250     91400   19.7200 -114.0300       9.0       179       109        60
OIR    2025250     91400   19.7200 -114.0400       9.0       179       109        60
OIR    2025250     91400   19.7200 -114.0500       9.0       181       109        60
OIR    2025250     91400   19.7200 -114.0600       9.0       182       109        60
OIR    2025250     91400   19.7200 -114.0700       9.0       183       108        60
OIR    2025250     91400   19.7200 -114.0800       9.1       185       108        60
OIR    2025250     91400   19.7200 -114.0900       9.1       185       109        60
OIR    2025250     91400   19.7200 -114.1000       9.1       186       109        60
OIR    2025250     91400   19.7200 -114.1100       9.1       187       110        60
OIR    2025250     91400   19.7200 -114.1200       9.1       189       110        60
OIR    2025250     91400   19.7200 -114.1300       9.1       190       110        60
OIR    2025250     91400   19.7200 -114.1400       9.0       191       111        60
OIR    2025250     91400   19.7200 -114.1500       9.0       192       111        60
OIR    2025250     91400   19.7200 -114.1600       8.9       193       112        60
OIR    2025250     91400   19.7200 -114.1700       8.8       194       112        60
OIR    2025250     91400   19.7200 -114.1800       8.7       195       112        60
OIR    2025250     91400   19.7200 -114.1900       8.7       196       112        60
OIR    2025250     91400   19.7200 -114.2000       8.6       197       111        60
OIR    2025250     91400   19.7200 -114.2100       8.6       197       111        60
OIR    2025250     91400   19.7200 -114.2200       8.6       197       111        60
OIR    2025250     91400   19.7200 -114.2300       8.5       198       113        60
OIR    2025250     91400   19.7200 -114.2400       8.5       200       114        60
OIR    2025250     91400   19.7200 -114.2500       8.4       203       113        60
OIR    2025250     91400   19.7200 -114.2600       8.4       208       112        60
OIR    2025250     91400   19.7200 -114.2700       8.4       211       113        60
OIR    2025250     91400   19.7200 -114.2800       8.5       214       115        60
OIR    2025250     91400   19.7200 -114.2900       8.5       216       116        60
OIR    2025250     91400   19.7200 -114.3000       8.5       217       116        60
OIR    2025250     91400   19.7200 -114.3100       8.6       218       117        60
OIR    2025250     91400   19.7200 -114.3200       8.6       218       117        60
OIR    2025250     91400   19.7200 -114.3300       8.6       218       117        60
OIR    2025250     91400   19.7200 -114.3400       8.6       219       117        60
OIR    2025250     91400   19.7200 -114.3500       8.6       219       117        60
OIR    2025250     91400   19.7200 -114.3600       8.6       219       119        60
OIR    2025250     91400   19.7200 -114.3700       8.6       219       119        60
OIR    2025250     91400   19.7200 -114.3800       8.6       219       119        60
OIR    2025250     91400   19.7200 -114.3900       8.6       219       121        60
OIR    2025250     91400   19.7200 -114.4000       8.6       219       122        60
OIR    2025250     91400   19.7200 -114.4100       8.6       219       123        60
OIR    2025250     91400   19.7200 -114.4200       8.6       219       125        60
OIR    2025250     91400   19.7200 -114.4300       8.6       219       126        60
OIR    2025250     91400   19.7200 -114.4400       8.6       219       127        60
OIR    2025250     91400   19.7200 -114.4500       8.6       219       126        60
OIR    2025250     91400   19.7200 -114.4600       8.5       218       125        60
OIR    2025250     91400   19.7200 -114.4700       8.5       218       125        60
OIR    2025250     91400   19.7200 -114.4800       8.3       217       125        60
OIR    2025250     91400   19.7200 -114.4900       7.9       214       126        60
OIR    2025250     91400   19.7200 -114.5000       7.2       207       126        60
OIR    2025250     91400   19.7200 -114.5100       6.6       201       126        60
OIR    2025250     91400   19.7200 -114.5200       6.2       195       126        60
OIR    2025250     91400   19.7200 -114.5300       6.0       191       126        60
OIR    2025250     91400   19.7200 -114.5400       5.9       187       126        60
OIR    2025250     91400   19.7200 -114.5500       5.8       183       126        60
OIR    2025250     91400   19.7200 -114.5600       5.8       181       126        60
OIR    2025250     91400   19.7200 -114.5700       5.8       179       126        60
OIR    2025250     91400   19.7200 -114.5800       5.8       177       127        60
OIR    2025250     91400   19.7200 -114.5900       5.9       175       127        60
OIR    2025250     91400   19.7200 -114.6000       6.0       173       128        60
OIR    2025250     91400   19.7200 -114.6100       6.1       172       129        60
OIR    2025250     91400   19.7200 -114.6200       6.1       172       130        60
OIR    2025250     91400   19.7200 -114.6300       6.2       171       131        60
OIR    2025250     91400   19.7200 -114.6400       6.2       171       133        60
OIR    2025250     91400   19.7200 -114.6500       6.2       171       135        60
OIR    2025250     91400   19.7200 -114.6600       6.2       171       136        60
OIR    2025250     91400   19.7200 -114.6700       6.2       171       136        60
OIR    2025250     91400   19.7200 -114.6800       6.2       171       137        60
OIR    2025250     91400   19.7200 -114.6900       6.3       172       138        60
OIR    2025250     91400   19.7200 -114.7000       6.4       176       139        60
OIR    2025250     91400   19.7200 -115.8500       6.5       181       140        60
OIR    2025250     91400   19.7200 -115.8600       6.8       180       139        60
OIR    2025250     91400   19.7200 -115.8700       7.0       179       137        60
OIR    2025250     91400   19.7200 -115.8800       7.3       177       136        60
OIR    2025250     91400   19.7200 -115.8900       7.6       176       135        60
OIR    2025250     91400   19.7200 -115.9000       7.8       174       134        60
OIR    2025250     91400   19.7200 -115.9100       8.0       173       133        60
OIR    2025250     91400   19.7200 -115.9200       8.2       171       133        60
OIR    2025250     91400   19.7200 -115.9300       8.3       171       133        60
OIR    2025250     91400   19.7200 -115.9400       8.6       171       134        60
OIR    2025250     91400   19.7200 -115.9500       9.0       171       134        60
OIR    2025250     91400   19.7200 -115.9600       9.3       171       135        60
OIR    2025250     91400   19.7200 -115.9700       9.6       171       137        60
OIR    2025250     91400   19.7200 -115.9800       9.8       172       139        60
OIR    2025250     91400   19.7200 -116.0400      10.9       175       141        60
OIR    2025250     91400   19.7200 -116.0500      11.0       175       139        60
OIR    2025250     91400   19.7200 -116.0600      11.1       176       139        60
OIR    2025250     91400   19.7200 -116.0700      11.2       176       139        60
OIR    2025250     91400   19.7200 -116.0800      11.2       176       139        60
OIR    2025250     91400   19.7200 -116.0900      11.3       176       140        60
OIR    2025250     91400   19.7200 -116.1000      11.3       176       139        60
OIR    2025250     91400   19.7200 -116.1100      11.3       176       139        60
OIR    2025250     91400   19.7200 -116.1200      11.3       176       141        60
OIR    2025250     91400   19.7200 -116.1500      11.4       176       141        60
OIR    2025250     91400   19.7200 -116.1600      11.4       176       140        60
OIR    2025250     91400   19.7200 -116.1700      11.4       176       142        60
OIR    2025250     91400   19.7200 -118.0100       4.1        52       139        60
OIR    2025250     91400   19.7200 -118.0200       4.3        55       137        60
OIR    2025250     91400   19.7200 -118.0300       4.4        56       136        60
OIR    2025250     91400   19.7200 -118.0400       4.7        58       136        60
OIR    2025250     91400   19.7200 -118.0500       4.9        59       136        60
OIR    2025250     91400   19.7200 -118.0600       5.0        59       136        60
OIR    2025250     91400   19.7200 -118.0700       5.1        60       137        60
OIR    2025250     91400   19.7200 -118.0800       5.2        61       137        60
OIR    2025250     91400   19.7200 -118.0900       5.4        63       139        60
OIR    2025250     91400   19.7200 -118.1000       5.7        65       138        60
OIR    2025250     91400   19.7200 -118.1100       6.1        68       137        60
OIR    2025250     91400   19.7200 -118.1200       6.2        69       135        60
OIR    2025250     91400   19.7200 -118.1300       6.3        70       136        60
OIR    2025250     91400   19.7200 -118.1400       6.4        70       137        60
OIR    2025250     91400   19.7200 -118.1500       6.4        71       139        60
OIR    2025250     91400   19.7200 -118.1600       6.4        71       140        60
OIR    2025250     91400   19.7100 -112.7600       8.6       147       139        60
OIR    2025250     91400   19.7100 -112.7700       8.7       149       137        60
OIR    2025250     91400   19.7100 -112.7800       8.6       153       136        60
OIR    2025250     91400   19.7100 -112.7900       8.4       158       136        60
OIR    2025250     91400   19.7100 -112.8000       8.2       162       137        60
OIR    2025250     91400   19.7100 -112.8100       8.1       165       138        60
OIR    2025250     91400   19.7100 -112.8200       8.0       167       137        60
OIR    2025250     91400   19.7100 -112.8300       7.9       168       137        60
OIR    2025250     91400   19.7100 -112.8400       7.9       169       136        60
OIR    2025250     91400   19.7100 -112.8500       7.9       169       135        60
OIR    2025250     91400   19.7100 -112.8600       7.9       169       135        60
OIR    2025250     91400   19.7100 -112.8700       7.9       169       135        60
OIR    2025250     91400   19.7100 -112.8800       7.9       169       134        60
OIR    2025250     91400   19.7100 -112.8900       7.9       169       133        60
OIR    2025250     91400   19.7100 -112.9000       7.9       169       133        60
OIR    2025250     91400   19.7100 -112.9100       7.9       169       133        60
OIR    2025250     91400   19.7100 -112.9200       7.9       169       134        60
OIR    2025250     91400   19.7100 -112.9300       7.9       169       134        60
OIR    2025250     91400   19.7100 -112.9400       7.9       169       134        60
OIR    2025250     91400   19.7100 -112.9500       7.9       169       133        60
OIR    2025250     91400   19.7100 -112.9600       7.9       169       131        60
OIR    2025250     91400   19.7100 -112.9700       7.9       169       130        60
OIR    2025250     91400   19.7100 -112.9800       7.9       169       128        60
OIR    2025250     91400   19.7100 -112.9900       7.9       169       127        60
OIR    2025250     91400   19.7100 -113.0000       7.9       169       125        60
OIR    2025250     91400   19.7100 -113.0100       7.9       169       124        60
OIR    2025250     91400   19.7100 -113.0200       7.9       169       122        60
OIR    2025250     91400   19.7100 -113.0300       7.9       169       121        60
OIR    2025250     91400   19.7100 -113.0400       7.9       169       121        60
OIR    2025250     91400   19.7100 -113.0500       7.8       170       120        60
OIR    2025250     91400   19.7100 -113.0600       7.8       170       119        60
OIR    2025250     91400   19.7100 -113.0700       7.8       170       119        60
OIR    2025250     91400   19.7100 -113.0800       7.8       170       119        60
OIR    2025250     91400   19.7100 -113.0900       7.8       170       119        60
OIR    2025250     91400   19.7100 -113.1000       7.8       170       119        60
OIR    2025250     91400   19.7100 -113.1100       7.8       170       117        60
OIR    2025250     91400   19.7100 -113.1200       7.8       170       119        60
OIR    2025250     91400   19.7100 -113.1300       7.8       170       121        60
OIR    2025250     91400   19.7100 -113.1400       7.8       170       122        60
OIR    2025250     91400   19.7100 -113.1500       7.8       170       121        60
OIR    2025250     91400   19.7100 -113.1600       7.8       170       120        60
OIR    2025250     91400   19.7100 -113.1700       7.8       170       117        60
OIR    2025250     91400   19.7100 -113.1800       7.8       170       116        60
OIR    2025250     91400   19.7100 -113.1900       7.8       170       115        60
OIR    2025250     91400   19.7100 -113.2000       7.8       170       115        60
OIR    2025250     91400   19.7100 -113.2100       7.8       170       114        60
OIR    2025250     91400   19.7100 -113.2200       7.8       170       114        60
OIR    2025250     91400   19.7100 -113.2300       7.8       169       113        60
OIR    2025250     91400   19.7100 -113.2400       7.8       169       112        60
OIR    2025250     91400   19.7100 -113.2500       7.9       169       111        60
OIR    2025250     91400   19.7100 -113.2600       7.9       169       110        60
OIR    2025250     91400   19.7100 -113.2700       7.9       169       109        60
OIR    2025250     91400   19.7100 -113.2800       8.0       169       109        60
OIR    2025250     91400   19.7100 -113.2900       8.0       169       108        60
OIR    2025250     91400   19.7100 -113.3000       8.0       169       107        60
OIR    2025250     91400   19.7100 -113.3100       8.0       169       107        60
OIR    2025250     91400   19.7100 -113.3200       8.0       169       107        60
OIR    2025250     91400   19.7100 -113.3300       8.1       169       105        60
OIR    2025250     91400   19.7100 -113.3400       8.1       169       104        60
OIR    2025250     91400   19.7100 -113.3500       8.1       169       104        60
OIR    2025250     91400   19.7100 -113.3600       8.1       169       103        60
OIR    2025250     91400   19.7100 -113.3700       8.1       169       103        60
OIR    2025250     91400   19.7100 -113.3800       8.1       169       103        60
OIR    2025250     91400   19.7100 -113.3900       8.1       169       103        60
OIR    2025250     91400   19.7100 -113.4000       8.1       169       103        60
OIR    2025250     91400   19.7100 -113.4100       8.1       169       103        60
OIR    2025250     91400   19.7100 -113.4200       8.2       169       103        60
OIR    2025250     91400   19.7100 -113.4300       8.2       169       103        60
OIR    2025250     91400   19.7100 -113.4400       8.2       169       103        60
OIR    2025250     91400   19.7100 -113.4500       8.2       169       103        60
OIR    2025250     91400   19.7100 -113.4600       8.3       169       103        60
OIR    2025250     91400   19.7100 -113.4700       8.3       169       103        60
OIR    2025250     91400   19.7100 -113.4800       8.3       169       103        60
OIR    2025250     91400   19.7100 -113.4900       8.3       169       103        60
OIR    2025250     91400   19.7100 -113.5000       8.3       169       103        60
OIR    2025250     91400   19.7100 -113.5100       8.3       169       103        60
OIR    2025250     91400   19.7100 -113.5200       8.3       169       104        60
OIR    2025250     91400   19.7100 -113.5300       8.3       169       104        60
OIR    2025250     91400   19.7100 -113.5400       8.3       169       104        60
OIR    2025250     91400   19.7100 -113.5500       8.4       169       104        60
OIR    2025250     91400   19.7100 -113.5600       8.4       169       104        60
OIR    2025250     91400   19.7100 -113.5700       8.4       170       104        60
OIR    2025250     91400   19.7100 -113.5800       8.4       170       104        60
OIR    2025250     91400   19.7100 -113.5900       8.4       170       105        60
OIR    2025250     91400   19.7100 -113.6000       8.4       171       105        60
OIR    2025250     91400   19.7100 -113.6100       8.5       172       105        60
OIR    2025250     91400   19.7100 -113.6200       8.5       173       105        60
OIR    2025250     91400   19.7100 -113.6300       8.5       173       105        60
OIR    2025250     91400   19.7100 -113.6400       8.6       174       104        60
OIR    2025250     91400   19.7100 -113.6500       8.6       174       104        60
OIR    2025250     91400   19.7100 -113.6600       8.6       174       103        60
OIR    2025250     91400   19.7100 -113.6700       8.6       174       103        60
OIR    2025250     91400   19.7100 -113.6800       8.7       175       103        60
OIR    2025250     91400   19.7100 -113.6900       8.7       175       103        60
OIR    2025250     91400   19.7100 -113.7000       8.7       175       103        60
OIR    2025250     91400   19.7100 -113.7100       8.7       175       103        60
OIR    2025250     91400   19.7100 -113.7200       8.8       175       104        60
OIR    2025250     91400   19.7100 -113.7300       8.8       175       104        60
OIR    2025250     91400   19.7100 -113.7400       8.8       175       104        60
OIR    2025250     91400   19.7100 -113.7500       8.8       176       104        60
OIR    2025250     91400   19.7100 -113.7600       8.8       176       104        60
OIR    2025250     91400   19.7100 -113.7700       8.9       176       104        60
OIR    2025250     91400   19.7100 -113.7800       8.9       176       104        60
OIR    2025250     91400   19.7100 -113.7900       8.9       176       105        60
OIR    2025250     91400   19.7100 -113.8000       8.9       176       105        60
OIR    2025250     91400   19.7100 -113.8100       8.9       176       107        60
OIR    2025250     91400   19.7100 -113.8200       9.0       176       105        60
OIR    2025250     91400   19.7100 -113.8300       9.0       177       105        60
OIR    2025250     91400   19.7100 -113.8400       9.0       177       107        60
OIR    2025250     91400   19.7100 -113.8500       9.0       177       107        60
OIR    2025250     91400   19.7100 -113.8600       9.0       177       107        60
OIR    2025250     91400   19.7100 -113.8700       9.0       178       107        60
OIR    2025250     91400   19.7100 -113.8800       9.0       178       107        60
OIR    2025250     91400   19.7100 -113.8900       9.1       178       105        60
OIR    2025250     91400   19.7100 -113.9000       9.1       178       105        60
OIR    2025250     91400   19.7100 -113.9100       9.1       178       105        60
OIR    2025250     91400   19.7100 -113.9200       9.1       178       107        60
OIR    2025250     91400   19.7100 -113.9300       9.1       178       105        60
OIR    2025250     91400   19.7100 -113.9400       9.1       178       104        60
OIR    2025250     91400   19.7100 -113.9500       9.1       179       104        60
OIR    2025250     91400   19.7100 -113.9600       9.1       179       104        60
OIR    2025250     91400   19.7100 -113.9700       9.1       179       104        60
OIR    2025250     91400   19.7100 -113.9800       9.1       179       104        60
OIR    2025250     91400   19.7100 -113.9900       9.1       179       104        60
OIR    2025250     91400   19.7100 -114.0000       9.1       179       105        60
OIR    2025250     91400   19.7100 -114.0100       9.0       179       105        60
OIR    2025250     91400   19.7100 -114.0200       9.0       179       107        60
OIR    2025250     91400   19.7100 -114.0300       9.0       179       108        60
OIR    2025250     91400   19.7100 -114.0400       9.0       180       109        60
OIR    2025250     91400   19.7100 -114.0500       9.0       181       109        60
OIR    2025250     91400   19.7100 -114.0600       9.0       182       109        60
OIR    2025250     91400   19.7100 -114.0700       9.0       183       108        60
OIR    2025250     91400   19.7100 -114.0800       9.0       184       108        60
OIR    2025250     91400   19.7100 -114.0900       9.0       185       109        60
OIR    2025250     91400   19.7100 -114.1000       9.0       186       109        60
OIR    2025250     91400   19.7100 -114.1100       9.0       187       109        60
OIR    2025250     91400   19.7100 -114.1200       9.0       188       109        60
OIR    2025250     91400   19.7100 -114.1300       9.0       189       109        60
OIR    2025250     91400   19.7100 -114.1400       9.0       190       110        60
OIR    2025250     91400   19.7100 -114.1500       8.9       192       110        60
OIR    2025250     91400   19.7100 -114.1600       8.8       193       110        60
OIR    2025250     91400   19.7100 -114.1700       8.8       194       110        60
OIR    2025250     91400   19.7100 -114.1800       8.7       195       110        60
OIR    2025250     91400   19.7100 -114.1900       8.6       196       110        60
OIR    2025250     91400   19.7100 -114.2000       8.6       197       110        60
OIR    2025250     91400   19.7100 -114.2100       8.6       197       110        60
OIR    2025250     91400   19.7100 -114.2200       8.5       197       110        60
OIR    2025250     91400   19.7100 -114.2300       8.5       198       111        60
OIR    2025250     91400   19.7100 -114.2400       8.5       199       112        60
OIR    2025250     91400   19.7100 -114.2500       8.4       201       111        60
OIR    2025250     91400   19.7100 -114.2600       8.3       206       111        60
OIR    2025250     91400   19.7100 -114.2700       8.3       210       112        60
OIR    2025250     91400   19.7100 -114.2800       8.4       213       114        60
OIR    2025250     91400   19.7100 -114.2900       8.5       215       116        60
OIR    2025250     91400   19.7100 -114.3000       8.5       217       116        60
OIR    2025250     91400   19.7100 -114.3100       8.5       218       116        60
OIR    2025250     91400   19.7100 -114.3200       8.6       218       116        60
OIR    2025250     91400   19.7100 -114.3300       8.6       218       116        60
OIR    2025250     91400   19.7100 -114.3400       8.6       219       116        60
OIR    2025250     91400   19.7100 -114.3500       8.6       219       116        60
OIR    2025250     91400   19.7100 -114.3600       8.6       219       116        60
OIR    2025250     91400   19.7100 -114.3700       8.6       219       116        60
OIR    2025250     91400   19.7100 -114.3800       8.6       219       116        60
OIR    2025250     91400   19.7100 -114.3900       8.6       219       117        60
OIR    2025250     91400   19.7100 -114.4000       8.6       219       120        60
OIR    2025250     91400   19.7100 -114.4100       8.6       219       121        60
OIR    2025250     91400   19.7100 -114.4200       8.6       219       123        60
OIR    2025250     91400   19.7100 -114.4300       8.6       219       125        60
OIR    2025250     91400   19.7100 -114.4400       8.6       219       125        60
OIR    2025250     91400   19.7100 -114.4500       8.6       219       126        60
OIR    2025250     91400   19.7100 -114.4600       8.6       218       125        60
OIR    2025250     91400   19.7100 -114.4700       8.5       218       124        60
OIR    2025250     91400   19.7100 -114.4800       8.4       217       125        60
OIR    2025250     91400   19.7100 -114.4900       8.0       214       126        60
OIR    2025250     91400   19.7100 -114.5000       7.3       208       126        60
OIR    2025250     91400   19.7100 -114.5100       6.7       201       125        60
OIR    2025250     91400   19.7100 -114.5200       6.3       196       125        60
OIR    2025250     91400   19.7100 -114.5300       6.1       191       126        60
OIR    2025250     91400   19.7100 -114.5400       6.0       186       126        60
OIR    2025250     91400   19.7100 -114.5500       5.9       183       126        60
OIR    2025250     91400   19.7100 -114.5600       5.9       180       126        60
OIR    2025250     91400   19.7100 -114.5700       5.9       178       126        60
OIR    2025250     91400   19.7100 -114.5800       5.9       176       127        60
OIR    2025250     91400   19.7100 -114.5900       6.0       174       127        60
OIR    2025250     91400   19.7100 -114.6000       6.1       172       128        60
OIR    2025250     91400   19.7100 -114.6100       6.1       172       129        60
OIR    2025250     91400   19.7100 -114.6200       6.1       172       131        60
OIR    2025250     91400   19.7100 -114.6300       6.2       171       132        60
OIR    2025250     91400   19.7100 -114.6400       6.2       171       134        60
OIR    2025250     91400   19.7100 -114.6500       6.2       171       136        60
OIR    2025250     91400   19.7100 -114.6600       6.2       171       137        60
OIR    2025250     91400   19.7100 -114.6700       6.3       171       137        60
OIR    2025250     91400   19.7100 -114.6800       6.3       171       138        60
OIR    2025250     91400   19.7100 -114.6900       6.3       171       138        60
OIR    2025250     91400   19.7100 -114.7000       6.3       173       139        60
OIR    2025250     91400   19.7100 -114.7100       6.4       173       141        60
OIR    2025250     91400   19.7100 -115.8500       6.4       182       140        60
OIR    2025250     91400   19.7100 -115.8600       6.7       181       139        60
OIR    2025250     91400   19.7100 -115.8700       7.0       179       137        60
OIR    2025250     91400   19.7100 -115.8800       7.3       178       136        60
OIR    2025250     91400   19.7100 -115.8900       7.6       177       134        60
OIR    2025250     91400   19.7100 -115.9000       7.9       176       133        60
OIR    2025250     91400   19.7100 -115.9100       8.2       175       132        60
OIR    2025250     91400   19.7100 -115.9200       8.4       174       132        60
OIR    2025250     91400   19.7100 -115.9300       8.6       173       132        60
OIR    2025250     91400   19.7100 -115.9400       8.9       172       133        60
OIR    2025250     91400   19.7100 -115.9500       9.2       172       134        60
OIR    2025250     91400   19.7100 -115.9600       9.4       172       135        60
OIR    2025250     91400   19.7100 -115.9700       9.7       172       136        60
OIR    2025250     91400   19.7100 -115.9800       9.9       172       137        60
OIR    2025250     91400   19.7100 -115.9900      10.0       173       141        60
OIR    2025250     91400   19.7100 -116.0400      10.9       175       142        60
OIR    2025250     91400   19.7100 -116.0500      11.0       176       139        60
OIR    2025250     91400   19.7100 -116.0600      11.1       176       139        60
OIR    2025250     91400   19.7100 -116.0700      11.1       176       138        60
OIR    2025250     91400   19.7100 -116.0800      11.2       176       139        60
OIR    2025250     91400   19.7100 -116.0900      11.2       176       140        60
OIR    2025250     91400   19.7100 -116.1000      11.3       176       139        60
OIR    2025250     91400   19.7100 -116.1100      11.3       176       139        60
OIR    2025250     91400   19.7100 -116.1200      11.3       176       141        60
OIR    2025250     91400   19.7100 -116.1500      11.4       176       141        60
OIR    2025250     91400   19.7100 -116.1600      11.4       176       139        60
OIR    2025250     91400   19.7100 -116.1700      11.4       176       140        60
OIR    2025250     91400   19.7100 -116.1800      11.4       176       141        60
OIR    2025250     91400   19.7100 -116.1900      11.4       177       142        60
OIR    2025250     91400   19.7100 -116.2000      11.5       177       142        60
OIR    2025250     91400   19.7100 -116.2100      11.9       181       142        60
OIR    2025250     91400   19.7100 -116.2200      12.5       185       143        60
OIR    2025250     91400   19.7100 -117.7300       4.1         3       141        60
OIR    2025250     91400   19.7100 -117.7400       4.1       351       143        60
OIR    2025250     91400   19.7100 -118.0100       4.2        53       140        60
OIR    2025250     91400   19.7100 -118.0200       4.4        56       139        60
OIR    2025250     91400   19.7100 -118.0300       4.5        57       138        60
OIR    2025250     91400   19.7100 -118.0400       4.7        58       137        60
OIR    2025250     91400   19.7100 -118.0500       4.9        59       136        60
OIR    2025250     91400   19.7100 -118.0600       5.0        60       136        60
OIR    2025250     91400   19.7100 -118.0700       5.2        61       136        60
OIR    2025250     91400   19.7100 -118.0800       5.4        63       136        60
OIR    2025250     91400   19.7100 -118.0900       5.7        65       137        60
OIR    2025250     91400   19.7100 -118.1000       6.0        68       138        60
OIR    2025250     91400   19.7100 -118.1100       6.3        70       136        60
OIR    2025250     91400   19.7100 -118.1200       6.4        71       134        60
OIR    2025250     91400   19.7100 -118.1300       6.5        71       135        60
OIR    2025250     91400   19.7100 -118.1400       6.5        72       136        60
OIR    2025250     91400   19.7100 -118.1500       6.5        72       137        60
OIR    2025250     91400   19.7100 -118.1600       6.6        71       138        60
OIR    2025250     91400   19.7100 -118.1700       6.6        71       141        60
OIR    2025250     91400   19.7000 -112.7500       8.3       149       140        60
OIR    2025250     91400   19.7000 -112.7600       8.4       151       139        60
OIR    2025250     91400   19.7000 -112.7700       8.4       154       138        60
OIR    2025250     91400   19.7000 -112.7800       8.3       157       137        60
OIR    2025250     91400   19.7000 -112.7900       8.2       162       136        60
OIR    2025250     91400   19.7000 -112.8000       8.1       165       137        60
OIR    2025250     91400   19.7000 -112.8100       8.0       167       138        60
OIR    2025250     91400   19.7000 -112.8200       8.0       168       138        60
OIR    2025250     91400   19.7000 -112.8300       7.9       169       137        60
OIR    2025250     91400   19.7000 -112.8400       7.9       169       136        60
OIR    2025250     91400   19.7000 -112.8500       7.9       169       135        60
OIR    2025250     91400   19.7000 -112.8600       7.9       169       135        60
OIR    2025250     91400   19.7000 -112.8700       7.9       169       135        60
OIR    2025250     91400   19.7000 -112.8800       7.9       169       135        60
OIR    2025250     91400   19.7000 -112.8900       7.9       169       134        60
OIR    2025250     91400   19.7000 -112.9000       7.9       169       133        60
OIR    2025250     91400   19.7000 -112.9100       7.9       169       134        60
OIR    2025250     91400   19.7000 -112.9200       7.9       169       135        60
OIR    2025250     91400   19.7000 -112.9300       7.9       169       136        60
OIR    2025250     91400   19.7000 -112.9400       7.9       169       135        60
OIR    2025250     91400   19.7000 -112.9500       7.9       169       134        60
OIR    2025250     91400   19.7000 -112.9600       7.9       169       133        60
OIR    2025250     91400   19.7000 -112.9700       7.9       169       132        60
OIR    2025250     91400   19.7000 -112.9800       7.9       169       130        60
OIR    2025250     91400   19.7000 -112.9900       7.9       169       128        60
OIR    2025250     91400   19.7000 -113.0000       7.9       169       126        60
OIR    2025250     91400   19.7000 -113.0100       7.9       169       125        60
OIR    2025250     91400   19.7000 -113.0200       7.9       169       123        60
OIR    2025250     91400   19.7000 -113.0300       7.9       170       121        60
OIR    2025250     91400   19.7000 -113.0400       7.9       170       120        60
OIR    2025250     91400   19.7000 -113.0500       7.8       170       117        60
OIR    2025250     91400   19.7000 -113.0600       7.8       170       119        60
OIR    2025250     91400   19.7000 -113.0700       7.8       170       120        60
OIR    2025250     91400   19.7000 -113.0800       7.8       170       119        60
OIR    2025250     91400   19.7000 -113.0900       7.8       170       117        60
OIR    2025250     91400   19.7000 -113.1000       7.8       170       119        60
OIR    2025250     91400   19.7000 -113.1100       7.8       170       120        60
OIR    2025250     91400   19.7000 -113.1200       7.8       170       121        60
OIR    2025250     91400   19.7000 -113.1300       7.8       170       122        60
OIR    2025250     91400   19.7000 -113.1400       7.8       170       123        60
OIR    2025250     91400   19.7000 -113.1500       7.8       170       122        60
OIR    2025250     91400   19.7000 -113.1600       7.8       170       121        60
OIR    2025250     91400   19.7000 -113.1700       7.8       170       119        60
OIR    2025250     91400   19.7000 -113.1800       7.8       170       116        60
OIR    2025250     91400   19.7000 -113.1900       7.8       170       116        60
OIR    2025250     91400   19.7000 -113.2000       7.8       170       115        60
OIR    2025250     91400   19.7000 -113.2100       7.8       170       115        60
OIR    2025250     91400   19.7000 -113.2200       7.8       170       115        60
OIR    2025250     91400   19.7000 -113.2300       7.8       170       115        60
OIR    2025250     91400   19.7000 -113.2400       7.8       170       113        60
OIR    2025250     91400   19.7000 -113.2500       7.9       170       111        60
OIR    2025250     91400   19.7000 -113.2600       7.9       170       110        60
OIR    2025250     91400   19.7000 -113.2700       7.9       170       109        60
OIR    2025250     91400   19.7000 -113.2800       7.9       170       108        60
OIR    2025250     91400   19.7000 -113.2900       8.0       169       108        60
OIR    2025250     91400   19.7000 -113.3000       8.0       169       107        60
OIR    2025250     91400   19.7000 -113.3100       8.0       169       105        60
OIR    2025250     91400   19.7000 -113.3200       8.0       169       105        60
OIR    2025250     91400   19.7000 -113.3300       8.0       170       104        60
OIR    2025250     91400   19.7000 -113.3400       8.0       170       104        60
OIR    2025250     91400   19.7000 -113.3500       8.0       170       104        60
OIR    2025250     91400   19.7000 -113.3600       8.0       170       104        60
OIR    2025250     91400   19.7000 -113.3700       8.1       170       103        60
OIR    2025250     91400   19.7000 -113.3800       8.1       170       103        60
OIR    2025250     91400   19.7000 -113.3900       8.1       170       103        60
OIR    2025250     91400   19.7000 -113.4000       8.1       170       103        60
OIR    2025250     91400   19.7000 -113.4100       8.1       170       103        60
OIR    2025250     91400   19.7000 -113.4200       8.1       170       103        60
OIR    2025250     91400   19.7000 -113.4300       8.2       170       103        60
OIR    2025250     91400   19.7000 -113.4400       8.2       169       103        60
OIR    2025250     91400   19.7000 -113.4500       8.2       169       103        60
OIR    2025250     91400   19.7000 -113.4600       8.2       169       103        60
OIR    2025250     91400   19.7000 -113.4700       8.3       169       103        60
OIR    2025250     91400   19.7000 -113.4800       8.3       169       103        60
OIR    2025250     91400   19.7000 -113.4900       8.3       169       103        60
OIR    2025250     91400   19.7000 -113.5000       8.3       169       103        60
OIR    2025250     91400   19.7000 -113.5100       8.3       169       103        60
OIR    2025250     91400   19.7000 -113.5200       8.3       169       104        60
OIR    2025250     91400   19.7000 -113.5300       8.3       169       104        60
OIR    2025250     91400   19.7000 -113.5400       8.3       169       104        60
OIR    2025250     91400   19.7000 -113.5500       8.4       170       104        60
OIR    2025250     91400   19.7000 -113.5600       8.4       170       104        60
OIR    2025250     91400   19.7000 -113.5700       8.4       170       104        60
OIR    2025250     91400   19.7000 -113.5800       8.4       170       104        60
OIR    2025250     91400   19.7000 -113.5900       8.4       171       104        60
OIR    2025250     91400   19.7000 -113.6000       8.5       171       105        60
OIR    2025250     91400   19.7000 -113.6100       8.5       172       105        60
OIR    2025250     91400   19.7000 -113.6200       8.5       173       105        60
OIR    2025250     91400   19.7000 -113.6300       8.5       174       104        60
OIR    2025250     91400   19.7000 -113.6400       8.6       174       104        60
OIR    2025250     91400   19.7000 -113.6500       8.6       174       103        60
OIR    2025250     91400   19.7000 -113.6600       8.6       174       103        60
OIR    2025250     91400   19.7000 -113.6700       8.6       174       103        60
OIR    2025250     91400   19.7000 -113.6800       8.7       175       103        60
OIR    2025250     91400   19.7000 -113.6900       8.7       175       103        60
OIR    2025250     91400   19.7000 -113.7000       8.7       175       103        60
OIR    2025250     91400   19.7000 -113.7100       8.7       175       103        60
OIR    2025250     91400   19.7000 -113.7200       8.8       175       104        60
OIR    2025250     91400   19.7000 -113.7300       8.8       175       104        60
OIR    2025250     91400   19.7000 -113.7400       8.8       176       104        60
OIR    2025250     91400   19.7000 -113.7500       8.8       176       104        60
OIR    2025250     91400   19.7000 -113.7600       8.9       176       104        60
OIR    2025250     91400   19.7000 -113.7700       8.9       176       104        60
OIR    2025250     91400   19.7000 -113.7800       8.9       176       105        60
OIR    2025250     91400   19.7000 -113.7900       8.9       176       105        60
OIR    2025250     91400   19.7000 -113.8000       8.9       176       107        60
OIR    2025250     91400   19.7000 -113.8100       8.9       176       107        60
OIR    2025250     91400   19.7000 -113.8200       9.0       177       107        60
OIR    2025250     91400   19.7000 -113.8300       9.0       177       108        60
OIR    2025250     91400   19.7000 -113.8400       9.0       177       108        60
OIR    2025250     91400   19.7000 -113.8500       9.0       177       107        60
OIR    2025250     91400   19.7000 -113.8600       9.0       178       107        60
OIR    2025250     91400   19.7000 -113.8700       9.0       178       107        60
OIR    2025250     91400   19.7000 -113.8800       9.1       178       107        60
OIR    2025250     91400   19.7000 -113.8900       9.1       178       107        60
OIR    2025250     91400   19.7000 -113.9000       9.1       178       107        60
OIR    2025250     91400   19.7000 -113.9100       9.1       178       107        60
OIR    2025250     91400   19.7000 -113.9200       9.1       178       107        60
OIR    2025250     91400   19.7000 -113.9300       9.1       178       105        60
OIR    2025250     91400   19.7000 -113.9400       9.1       179       105        60
OIR    2025250     91400   19.7000 -113.9500       9.1       179       105        60
OIR    2025250     91400   19.7000 -113.9600       9.1       179       105        60
OIR    2025250     91400   19.7000 -113.9700       9.1       179       105        60
OIR    2025250     91400   19.7000 -113.9800       9.1       179       104        60
OIR    2025250     91400   19.7000 -113.9900       9.1       179       104        60
OIR    2025250     91400   19.7000 -114.0000       9.1       179       105        60
OIR    2025250     91400   19.7000 -114.0100       9.0       179       105        60
OIR    2025250     91400   19.7000 -114.0200       9.0       179       107        60
OIR    2025250     91400   19.7000 -114.0300       9.0       179       108        60
OIR    2025250     91400   19.7000 -114.0400       9.0       180       108        60
OIR    2025250     91400   19.7000 -114.0500       9.0       181       109        60
OIR    2025250     91400   19.7000 -114.0600       9.0       182       109        60
OIR    2025250     91400   19.7000 -114.0700       9.0       183       108        60
OIR    2025250     91400   19.7000 -114.0800       9.0       184       108        60
OIR    2025250     91400   19.7000 -114.0900       9.0       185       108        60
OIR    2025250     91400   19.7000 -114.1000       9.0       186       109        60
OIR    2025250     91400   19.7000 -114.1100       9.0       187       109        60
OIR    2025250     91400   19.7000 -114.1200       8.9       188       109        60
OIR    2025250     91400   19.7000 -114.1300       8.9       189       109        60
OIR    2025250     91400   19.7000 -114.1400       8.9       190       109        60
OIR    2025250     91400   19.7000 -114.1500       8.8       191       110        60
OIR    2025250     91400   19.7000 -114.1600       8.8       193       110        60
OIR    2025250     91400   19.7000 -114.1700       8.7       194       109        60
OIR    2025250     91400   19.7000 -114.1800       8.6       195       109        60
OIR    2025250     91400   19.7000 -114.1900       8.6       196       108        60
OIR    2025250     91400   19.7000 -114.2000       8.6       197       108        60
OIR    2025250     91400   19.7000 -114.2100       8.5       197       109        60
OIR    2025250     91400   19.7000 -114.2200       8.5       197       109        60
OIR    2025250     91400   19.7000 -114.2300       8.5       197       110        60
OIR    2025250     91400   19.7000 -114.2400       8.5       198       111        60
OIR    2025250     91400   19.7000 -114.2500       8.4       200       111        60
OIR    2025250     91400   19.7000 -114.2600       8.3       204       110        60
OIR    2025250     91400   19.7000 -114.2700       8.3       209       111        60
OIR    2025250     91400   19.7000 -114.2800       8.3       212       113        60
OIR    2025250     91400   19.7000 -114.2900       8.4       215       115        60
OIR    2025250     91400   19.7000 -114.3000       8.5       216       116        60
OIR    2025250     91400   19.7000 -114.3100       8.5       218       116        60
OIR    2025250     91400   19.7000 -114.3200       8.6       218       116        60
OIR    2025250     91400   19.7000 -114.3300       8.6       218       116        60
OIR    2025250     91400   19.7000 -114.3400       8.6       219       116        60
OIR    2025250     91400   19.7000 -114.3500       8.6       219       116        60
OIR    2025250     91400   19.7000 -114.3600       8.6       219       116        60
OIR    2025250     91400   19.7000 -114.3700       8.6       219       115        60
OIR    2025250     91400   19.7000 -114.3800       8.6       219       114        60
OIR    2025250     91400   19.7000 -114.3900       8.6       219       115        60
OIR    2025250     91400   19.7000 -114.4000       8.6       219       116        60
OIR    2025250     91400   19.7000 -114.4100       8.6       219       119        60
OIR    2025250     91400   19.7000 -114.4200       8.6       219       121        60
OIR    2025250     91400   19.7000 -114.4300       8.6       219       123        60
OIR    2025250     91400   19.7000 -114.4400       8.6       219       124        60
OIR    2025250     91400   19.7000 -114.4500       8.6       219       124        60
OIR    2025250     91400   19.7000 -114.4600       8.6       219       124        60
OIR    2025250     91400   19.7000 -114.4700       8.5       218       124        60
OIR    2025250     91400   19.7000 -114.4800       8.5       218       125        60
OIR    2025250     91400   19.7000 -114.4900       8.2       215       125        60
OIR    2025250     91400   19.7000 -114.5000       7.5       209       125        60
OIR    2025250     91400   19.7000 -114.5100       6.8       202       125        60
OIR    2025250     91400   19.7000 -114.5200       6.4       196       125        60
OIR    2025250     91400   19.7000 -114.5300       6.2       191       125        60
OIR    2025250     91400   19.7000 -114.5400       6.0       186       126        60
OIR    2025250     91400   19.7000 -114.5500       5.9       183       126        60
OIR    2025250     91400   19.7000 -114.5600       5.9       180       127        60
OIR    2025250     91400   19.7000 -114.5700       6.0       177       127        60
OIR    2025250     91400   19.7000 -114.5800       6.0       175       127        60
OIR    2025250     91400   19.7000 -114.5900       6.1       173       127        60
OIR    2025250     91400   19.7000 -114.6000       6.1       172       128        60
OIR    2025250     91400   19.7000 -114.6100       6.1       172       129        60
OIR    2025250     91400   19.7000 -114.6200       6.2       171       131        60
OIR    2025250     91400   19.7000 -114.6300       6.2       171       132        60
OIR    2025250     91400   19.7000 -114.6400       6.2       171       134        60
OIR    2025250     91400   19.7000 -114.6500       6.2       171       135        60
OIR    2025250     91400   19.7000 -114.6600       6.3       171       136        60
OIR    2025250     91400   19.7000 -114.6700       6.3       171       137        60
OIR    2025250     91400   19.7000 -114.6800       6.3       171       138        60
OIR    2025250     91400   19.7000 -114.6900       6.3       171       138        60
OIR    2025250     91400   19.7000 -114.7000       6.3       171       139        60
OIR    2025250     91400   19.7000 -115.8500       6.3       182       141        60
OIR    2025250     91400   19.7000 -115.8600       6.6       181       139        60
OIR    2025250     91400   19.7000 -115.8700       6.9       180       137        60
OIR    2025250     91400   19.7000 -115.8800       7.3       179       136        60
OIR    2025250     91400   19.7000 -115.8900       7.7       178       134        60
OIR    2025250     91400   19.7000 -115.9000       8.0       177       133        60
OIR    2025250     91400   19.7000 -115.9100       8.3       176       131        60
OIR    2025250     91400   19.7000 -115.9200       8.5       175       131        60
OIR    2025250     91400   19.7000 -115.9300       8.8       174       132        60
OIR    2025250     91400   19.7000 -115.9400       9.0       174       133        60
OIR    2025250     91400   19.7000 -115.9500       9.3       173       136        60
OIR    2025250     91400   19.7000 -115.9600       9.5       173       138        60
OIR    2025250     91400   19.7000 -115.9700       9.7       173       137        60
OIR    2025250     91400   19.7000 -115.9800       9.9       173       136        60
OIR    2025250     91400   19.7000 -115.9900      10.1       173       139        60
OIR    2025250     91400   19.7000 -116.0400      10.9       176       141        60
OIR    2025250     91400   19.7000 -116.0500      10.9       176       139        60
OIR    2025250     91400   19.7000 -116.0600      11.0       176       140        60
OIR    2025250     91400   19.7000 -116.0700      11.1       176       142        60
OIR    2025250     91400   19.7000 -116.0800      11.1       176       142        60
OIR    2025250     91400   19.7000 -116.0900      11.2       176       141        60
OIR    2025250     91400   19.7000 -116.1000      11.2       176       141        60
OIR    2025250     91400   19.7000 -116.1100      11.3       176       141        60
OIR    2025250     91400   19.7000 -116.1200      11.3       176       142        60
OIR    2025250     91400   19.7000 -116.1600      11.4       176       143        60
OIR    2025250     91400   19.7000 -116.1700      11.4       176       142        60
OIR    2025250     91400   19.7000 -116.1800      11.4       176       141        60
OIR    2025250     91400   19.7000 -116.1900      11.4       177       141        60
OIR    2025250     91400   19.7000 -116.2000      11.5       177       141        60
OIR    2025250     91400   19.7000 -116.2100      11.7       179       142        60
OIR    2025250     91400   19.7000 -117.7100       4.2        26       140        60
OIR    2025250     91400   19.7000 -117.7200       5.0        19       140        60
OIR    2025250     91400   19.7000 -117.7300       5.7        16       140        60
OIR    2025250     91400   19.7000 -117.7400       6.0        15       142        60
OIR    2025250     91400   19.7000 -118.0200       4.5        56       140        60
OIR    2025250     91400   19.7000 -118.0300       4.7        58       139        60
OIR    2025250     91400   19.7000 -118.0400       4.8        59       138        60
OIR    2025250     91400   19.7000 -118.0500       5.0        60       137        60
OIR    2025250     91400   19.7000 -118.0600       5.1        61       135        60
OIR    2025250     91400   19.7000 -118.0700       5.4        63       135        60
OIR    2025250     91400   19.7000 -118.0800       5.7        66       134        60
OIR    2025250     91400   19.7000 -118.0900       6.0        69       135        60
OIR    2025250     91400   19.7000 -118.1000       6.4        71       136        60
OIR    2025250     91400   19.7000 -118.1100       6.5        72       135        60
OIR    2025250     91400   19.7000 -118.1200       6.6        72       134        60
OIR    2025250     91400   19.7000 -118.1300       6.6        72       135        60
OIR    2025250     91400   19.7000 -118.1400       6.6        72       136        60
OIR    2025250     91400   19.7000 -118.1500       6.6        72       137        60
OIR    2025250     91400   19.7000 -118.1600       6.7        72       137        60
OIR    2025250     91400   19.7000 -118.1700       6.7        71       139        60
OIR    2025250     91400   19.6900 -112.7500       8.3       151       139        60
OIR    2025250     91400   19.6900 -112.7600       8.4       153       139        60
OIR    2025250     91400   19.6900 -112.7700       8.3       158       138        60
OIR    2025250     91400   19.6900 -112.7800       8.2       162       138        60
OIR    2025250     91400   19.6900 -112.7900       8.1       165       137        60
OIR    2025250     91400   19.6900 -112.8000       8.1       167       137        60
OIR    2025250     91400   19.6900 -112.8100       8.0       168       138        60
OIR    2025250     91400   19.6900 -112.8200       8.0       169       138        60
OIR    2025250     91400   19.6900 -112.8300       7.9       169       137        60
OIR    2025250     91400   19.6900 -112.8400       7.9       169       136        60
OIR    2025250     91400   19.6900 -112.8500       7.9       169       135        60
OIR    2025250     91400   19.6900 -112.8600       7.9       169       134        60
OIR    2025250     91400   19.6900 -112.8700       7.9       169       134        60
OIR    2025250     91400   19.6900 -112.8800       7.9       169       135        60
OIR    2025250     91400   19.6900 -112.8900       7.9       169       135        60
OIR    2025250     91400   19.6900 -112.9000       7.9       169       135        60
OIR    2025250     91400   19.6900 -112.9100       7.9       169       135        60
OIR    2025250     91400   19.6900 -112.9200       7.9       169       136        60
OIR    2025250     91400   19.6900 -112.9300       7.9       169       137        60
OIR    2025250     91400   19.6900 -112.9400       7.9       169       136        60
OIR    2025250     91400   19.6900 -112.9500       7.9       169       134        60
OIR    2025250     91400   19.6900 -112.9600       7.9       169       133        60
OIR    2025250     91400   19.6900 -112.9700       7.9       169       132        60
OIR    2025250     91400   19.6900 -112.9800       7.9       169       130        60
OIR    2025250     91400   19.6900 -112.9900       7.9       169       127        60
OIR    2025250     91400   19.6900 -113.0000       7.9       170       125        60
OIR    2025250     91400   19.6900 -113.0100       7.9       170       124        60
OIR    2025250     91400   19.6900 -113.0200       7.9       170       124        60
OIR    2025250     91400   19.6900 -113.0300       7.9       170       123        60
OIR    2025250     91400   19.6900 -113.0400       7.9       170       122        60
OIR    2025250     91400   19.6900 -113.0500       7.8       170       121        60
OIR    2025250     91400   19.6900 -113.0600       7.8       171       120        60
OIR    2025250     91400   19.6900 -113.0700       7.8       171       119        60
OIR    2025250     91400   19.6900 -113.0800       7.8       171       119        60
OIR    2025250     91400   19.6900 -113.0900       7.8       171       119        60
OIR    2025250     91400   19.6900 -113.1000       7.8       171       120        60
OIR    2025250     91400   19.6900 -113.1100       7.8       171       121        60
OIR    2025250     91400   19.6900 -113.1200       7.8       171       122        60
OIR    2025250     91400   19.6900 -113.1300       7.8       171       123        60
OIR    2025250     91400   19.6900 -113.1400       7.8       171       123        60
OIR    2025250     91400   19.6900 -113.1500       7.8       171       122        60
OIR    2025250     91400   19.6900 -113.1600       7.8       171       120        60
OIR    2025250     91400   19.6900 -113.1700       7.8       171       119        60
OIR    2025250     91400   19.6900 -113.1800       7.8       170       116        60
OIR    2025250     91400   19.6900 -113.1900       7.8       170       116        60
OIR    2025250     91400   19.6900 -113.2000       7.8       170       116        60
OIR    2025250     91400   19.6900 -113.2100       7.8       170       116        60
OIR    2025250     91400   19.6900 -113.2200       7.8       170       115        60
OIR    2025250     91400   19.6900 -113.2300       7.8       170       115        60
OIR    2025250     91400   19.6900 -113.2400       7.8       170       113        60
OIR    2025250     91400   19.6900 -113.2500       7.8       170       111        60
OIR    2025250     91400   19.6900 -113.2600       7.9       170       109        60
OIR    2025250     91400   19.6900 -113.2700       7.9       170       109        60
OIR    2025250     91400   19.6900 -113.2800       7.9       170       108        60
OIR    2025250     91400   19.6900 -113.2900       7.9       170       107        60
OIR    2025250     91400   19.6900 -113.3000       8.0       170       107        60
OIR    2025250     91400   19.6900 -113.3100       8.0       170       105        60
OIR    2025250     91400   19.6900 -113.3200       8.0       170       104        60
OIR    2025250     91400   19.6900 -113.3300       8.0       170       104        60
OIR    2025250     91400   19.6900 -113.3400       8.0       170       104        60
OIR    2025250     91400   19.6900 -113.3500       8.0       170       104        60
OIR    2025250     91400   19.6900 -113.3600       8.0       170       104        60
OIR    2025250     91400   19.6900 -113.3700       8.0       170       103        60
OIR    2025250     91400   19.6900 -113.3800       8.1       170       103        60
OIR    2025250     91400   19.6900 -113.3900       8.1       170       103        60
OIR    2025250     91400   19.6900 -113.4000       8.1       170       103        60
OIR    2025250     91400   19.6900 -113.4100       8.1       170       103        60
OIR    2025250     91400   19.6900 -113.4200       8.1       170       103        60
OIR    2025250     91400   19.6900 -113.4300       8.2       170       103        60
OIR    2025250     91400   19.6900 -113.4400       8.2       170       103        60
OIR    2025250     91400   19.6900 -113.4500       8.2       170       103        60
OIR    2025250     91400   19.6900 -113.4600       8.2       170       103        60
OIR    2025250     91400   19.6900 -113.4700       8.2       169       103        60
OIR    2025250     91400   19.6900 -113.4800       8.3       169       103        60
OIR    2025250     91400   19.6900 -113.4900       8.3       169       103        60
OIR    2025250     91400   19.6900 -113.5000       8.3       169       103        60
OIR    2025250     91400   19.6900 -113.5100       8.3       169       103        60
OIR    2025250     91400   19.6900 -113.5200       8.3       169       103        60
OIR    2025250     91400   19.6900 -113.5300       8.3       169       104        60
OIR    2025250     91400   19.6900 -113.5400       8.4       170       104        60
OIR    2025250     91400   19.6900 -113.5500       8.4       170       104        60
OIR    2025250     91400   19.6900 -113.5600       8.4       170       104        60
OIR    2025250     91400   19.6900 -113.5700       8.4       170       104        60
OIR    2025250     91400   19.6900 -113.5800       8.4       171       104        60
OIR    2025250     91400   19.6900 -113.5900       8.5       171       104        60
OIR    2025250     91400   19.6900 -113.6000       8.5       172       104        60
OIR    2025250     91400   19.6900 -113.6100       8.5       173       104        60
OIR    2025250     91400   19.6900 -113.6200       8.6       174       104        60
OIR    2025250     91400   19.6900 -113.6300       8.6       174       104        60
OIR    2025250     91400   19.6900 -113.6400       8.6       174       104        60
OIR    2025250     91400   19.6900 -113.6500       8.6       174       103        60
OIR    2025250     91400   19.6900 -113.6600       8.6       174       103        60
OIR    2025250     91400   19.6900 -113.6700       8.7       175       103        60
OIR    2025250     91400   19.6900 -113.6800       8.7       175       103        60
OIR    2025250     91400   19.6900 -113.6900       8.7       175       103        60
OIR    2025250     91400   19.6900 -113.7000       8.7       175       103        60
OIR    2025250     91400   19.6900 -113.7100       8.8       175       103        60
OIR    2025250     91400   19.6900 -113.7200       8.8       175       104        60
OIR    2025250     91400   19.6900 -113.7300       8.8       176       104        60
OIR    2025250     91400   19.6900 -113.7400       8.8       176       104        60
OIR    2025250     91400   19.6900 -113.7500       8.8       176       104        60
OIR    2025250     91400   19.6900 -113.7600       8.9       176       104        60
OIR    2025250     91400   19.6900 -113.7700       8.9       176       104        60
OIR    2025250     91400   19.6900 -113.7800       8.9       176       105        60
OIR    2025250     91400   19.6900 -113.7900       8.9       176       105        60
OIR    2025250     91400   19.6900 -113.8000       8.9       176       107        60
OIR    2025250     91400   19.6900 -113.8100       9.0       177       107        60
OIR    2025250     91400   19.6900 -113.8200       9.0       177       108        60
OIR    2025250     91400   19.6900 -113.8300       9.0       177       108        60
OIR    2025250     91400   19.6900 -113.8400       9.0       177       108        60
OIR    2025250     91400   19.6900 -113.8500       9.0       178       108        60
OIR    2025250     91400   19.6900 -113.8600       9.0       178       108        60
OIR    2025250     91400   19.6900 -113.8700       9.0       178       107        60
OIR    2025250     91400   19.6900 -113.8800       9.1       178       107        60
OIR    2025250     91400   19.6900 -113.8900       9.1       178       107        60
OIR    2025250     91400   19.6900 -113.9000       9.1       178       107        60
OIR    2025250     91400   19.6900 -113.9100       9.1       178       107        60
OIR    2025250     91400   19.6900 -113.9200       9.1       178       105        60
OIR    2025250     91400   19.6900 -113.9300       9.1       179       105        60
OIR    2025250     91400   19.6900 -113.9400       9.1       179       107        60
OIR    2025250     91400   19.6900 -113.9500       9.1       179       107        60
OIR    2025250     91400   19.6900 -113.9600       9.1       179       105        60
OIR    2025250     91400   19.6900 -113.9700       9.1       179       105        60
OIR    2025250     91400   19.6900 -113.9800       9.1       179       105        60
OIR    2025250     91400   19.6900 -113.9900       9.1       179       105        60
OIR    2025250     91400   19.6900 -114.0000       9.0       179       105        60
OIR    2025250     91400   19.6900 -114.0100       9.0       179       107        60
OIR    2025250     91400   19.6900 -114.0200       9.0       179       107        60
OIR    2025250     91400   19.6900 -114.0300       9.0       180       107        60
OIR    2025250     91400   19.6900 -114.0400       9.0       180       108        60
OIR    2025250     91400   19.6900 -114.0500       9.0       181       108        60
OIR    2025250     91400   19.6900 -114.0600       8.9       182       109        60
OIR    2025250     91400   19.6900 -114.0700       8.9       183       108        60
OIR    2025250     91400   19.6900 -114.0800       8.9       184       108        60
OIR    2025250     91400   19.6900 -114.0900       8.9       185       108        60
OIR    2025250     91400   19.6900 -114.1000       8.9       186       108        60
OIR    2025250     91400   19.6900 -114.1100       8.9       187       108        60
OIR    2025250     91400   19.6900 -114.1200       8.9       188       108        60
OIR    2025250     91400   19.6900 -114.1300       8.9       189       108        60
OIR    2025250     91400   19.6900 -114.1400       8.8       190       109        60
OIR    2025250     91400   19.6900 -114.1500       8.8       191       110        60
OIR    2025250     91400   19.6900 -114.1600       8.7       192       109        60
OIR    2025250     91400   19.6900 -114.1700       8.7       194       109        60
OIR    2025250     91400   19.6900 -114.1800       8.6       195       109        60
OIR    2025250     91400   19.6900 -114.1900       8.6       196       108        60
OIR    2025250     91400   19.6900 -114.2000       8.6       197       108        60
OIR    2025250     91400   19.6900 -114.2100       8.5       197       108        60
OIR    2025250     91400   19.6900 -114.2200       8.5       197       109        60
OIR    2025250     91400   19.6900 -114.2300       8.5       197       110        60
OIR    2025250     91400   19.6900 -114.2400       8.5       198       111        60
OIR    2025250     91400   19.6900 -114.2500       8.4       199       111        60
OIR    2025250     91400   19.6900 -114.2600       8.3       202       110        60
OIR    2025250     91400   19.6900 -114.2700       8.2       207       111        60
OIR    2025250     91400   19.6900 -114.2800       8.2       211       112        60
OIR    2025250     91400   19.6900 -114.2900       8.3       214       114        60
OIR    2025250     91400   19.6900 -114.3000       8.5       216       115        60
OIR    2025250     91400   19.6900 -114.3100       8.5       218       116        60
OIR    2025250     91400   19.6900 -114.3200       8.6       218       116        60
OIR    2025250     91400   19.6900 -114.3300       8.6       219       116        60
OIR    2025250     91400   19.6900 -114.3400       8.6       219       116        60
OIR    2025250     91400   19.6900 -114.3500       8.6       219       116        60
OIR    2025250     91400   19.6900 -114.3600       8.6       219       116        60
OIR    2025250     91400   19.6900 -114.3700       8.6       219       115        60
OIR    2025250     91400   19.6900 -114.3800       8.6       219       114        60
OIR    2025250     91400   19.6900 -114.3900       8.6       219       115        60
OIR    2025250     91400   19.6900 -114.4000       8.6       219       116        60
OIR    2025250     91400   19.6900 -114.4100       8.6       219       117        60
OIR    2025250     91400   19.6900 -114.4200       8.6       219       121        60
OIR    2025250     91400   19.6900 -114.4300       8.6       219       123        60
OIR    2025250     91400   19.6900 -114.4400       8.6       219       124        60
OIR    2025250     91400   19.6900 -114.4500       8.6       219       125        60
OIR    2025250     91400   19.6900 -114.4600       8.6       219       125        60
OIR    2025250     91400   19.6900 -114.4700       8.5       218       124        60
OIR    2025250     91400   19.6900 -114.4800       8.5       218       124        60
OIR    2025250     91400   19.6900 -114.4900       8.3       216       125        60
OIR    2025250     91400   19.6900 -114.5000       7.7       211       125        60
OIR    2025250     91400   19.6900 -114.5100       7.0       204       125        60
OIR    2025250     91400   19.6900 -114.5200       6.5       197       125        60
OIR    2025250     91400   19.6900 -114.5300       6.2       191       125        60
OIR    2025250     91400   19.6900 -114.5400       6.1       185       126        60
OIR    2025250     91400   19.6900 -114.5500       6.0       182       126        60
OIR    2025250     91400   19.6900 -114.5600       6.0       179       127        60
OIR    2025250     91400   19.6900 -114.5700       6.0       177       127        60
OIR    2025250     91400   19.6900 -114.5800       6.1       174       127        60
OIR    2025250     91400   19.6900 -114.5900       6.1       173       127        60
OIR    2025250     91400   19.6900 -114.6000       6.1       172       128        60
OIR    2025250     91400   19.6900 -114.6100       6.2       172       129        60
OIR    2025250     91400   19.6900 -114.6200       6.2       171       131        60
OIR    2025250     91400   19.6900 -114.6300       6.2       171       133        60
OIR    2025250     91400   19.6900 -114.6400       6.3       171       134        60
OIR    2025250     91400   19.6900 -114.6500       6.3       171       135        60
OIR    2025250     91400   19.6900 -114.6600       6.3       170       136        60
OIR    2025250     91400   19.6900 -114.6700       6.3       170       137        60
OIR    2025250     91400   19.6900 -114.6800       6.3       170       138        60
OIR    2025250     91400   19.6900 -114.6900       6.3       170       139        60
OIR    2025250     91400   19.6900 -114.7000       6.3       169       139        60
OIR    2025250     91400   19.6900 -115.8500       6.3       182       142        60
OIR    2025250     91400   19.6900 -115.8600       6.6       181       139        60
OIR    2025250     91400   19.6900 -115.8700       6.9       181       137        60
OIR    2025250     91400   19.6900 -115.8800       7.4       181       136        60
OIR    2025250     91400   19.6900 -115.8900       7.8       179       135        60
OIR    2025250     91400   19.6900 -115.9000       8.2       178       133        60
OIR    2025250     91400   19.6900 -115.9100       8.4       177       131        60
OIR    2025250     91400   19.6900 -115.9200       8.7       176       130        60
OIR    2025250     91400   19.6900 -115.9300       9.0       175       131        60
OIR    2025250     91400   19.6900 -115.9400       9.2       175       133        60
OIR    2025250     91400   19.6900 -115.9500       9.4       174       136        60
OIR    2025250     91400   19.6900 -115.9600       9.6       174       139        60
OIR    2025250     91400   19.6900 -115.9700       9.8       173       138        60
OIR    2025250     91400   19.6900 -115.9800      10.0       174       136        60
OIR    2025250     91400   19.6900 -115.9900      10.1       174       137        60
OIR    2025250     91400   19.6900 -116.0000      10.3       174       141        60
OIR    2025250     91400   19.6900 -116.0200      10.7       175       142        60
OIR    2025250     91400   19.6900 -116.0300      10.8       176       140        60
OIR    2025250     91400   19.6900 -116.0400      10.9       176       139        60
OIR    2025250     91400   19.6900 -116.0500      10.9       176       138        60
OIR    2025250     91400   19.6900 -116.0600      11.0       176       141        60
OIR    2025250     91400   19.6900 -116.1000      11.2       176       142        60
OIR    2025250     91400   19.6900 -116.1800      11.4       176       142        60
OIR    2025250     91400   19.6900 -116.1900      11.4       176       141        60
OIR    2025250     91400   19.6900 -116.2000      11.4       177       141        60
OIR    2025250     91400   19.6900 -116.2100      11.6       177       142        60
OIR    2025250     91400   19.6900 -117.7100       5.0        26       139        60
OIR    2025250     91400   19.6900 -117.7200       6.0        19       139        60
OIR    2025250     91400   19.6900 -117.7300       6.5        18       139        60
OIR    2025250     91400   19.6900 -117.7400       6.8        17       142        60
OIR    2025250     91400   19.6900 -118.0200       4.8        57       140        60
OIR    2025250     91400   19.6900 -118.0300       4.9        59       140        60
OIR    2025250     91400   19.6900 -118.0400       5.0        60       138        60
OIR    2025250     91400   19.6900 -118.0500       5.2        61       136        60
OIR    2025250     91400   19.6900 -118.0600       5.4        63       135        60
OIR    2025250     91400   19.6900 -118.0700       5.8        67       134        60
OIR    2025250     91400   19.6900 -118.0800       6.1        69       133        60
OIR    2025250     91400   19.6900 -118.0900       6.4        72       134        60
OIR    2025250     91400   19.6900 -118.1000       6.6        73       134        60
OIR    2025250     91400   19.6900 -118.1100       6.7        73       134        60
OIR    2025250     91400   19.6900 -118.1200       6.7        73       134        60
OIR    2025250     91400   19.6900 -118.1300       6.7        73       135        60
OIR    2025250     91400   19.6900 -118.1400       6.7        72       137        60
OIR    2025250     91400   19.6900 -118.1500       6.7        72       138        60
OIR    2025250     91400   19.6900 -118.1600       6.8        72       139        60
OIR    2025250     91400   19.6900 -118.1700       6.9        71       140        60
OIR    2025250     91400   19.6800 -112.7500       8.4       153       140        60
OIR    2025250     91400   19.6800 -112.7600       8.4       156       140        60
OIR    2025250     91400   19.6800 -112.7700       8.3       160       140        60
OIR    2025250     91400   19.6800 -112.7800       8.2       164       139        60
OIR    2025250     91400   19.6800 -112.7900       8.1       166       138        60
OIR    2025250     91400   19.6800 -112.8000       8.1       168       137        60
OIR    2025250     91400   19.6800 -112.8100       8.0       169       137        60
OIR    2025250     91400   19.6800 -112.8200       8.0       169       138        60
OIR    2025250     91400   19.6800 -112.8300       7.9       169       137        60
OIR    2025250     91400   19.6800 -112.8400       7.9       169       137        60
OIR    2025250     91400   19.6800 -112.8500       7.9       169       136        60
OIR    2025250     91400   19.6800 -112.8600       7.9       169       134        60
OIR    2025250     91400   19.6800 -112.8700       7.9       170       134        60
OIR    2025250     91400   19.6800 -112.8800       7.9       170       135        60
OIR    2025250     91400   19.6800 -112.8900       7.9       169       135        60
OIR    2025250     91400   19.6800 -112.9000       7.9       169       135        60
OIR    2025250     91400   19.6800 -112.9100       7.9       169       136        60
OIR    2025250     91400   19.6800 -112.9200       7.9       169       136        60
OIR    2025250     91400   19.6800 -112.9300       7.9       169       137        60
OIR    2025250     91400   19.6800 -112.9400       7.9       169       136        60
OIR    2025250     91400   19.6800 -112.9500       7.9       169       134        60
OIR    2025250     91400   19.6800 -112.9600       7.9       169       133        60
OIR    2025250     91400   19.6800 -112.9700       7.9       169       131        60
OIR    2025250     91400   19.6800 -112.9800       7.9       170       130        60
OIR    2025250     91400   19.6800 -112.9900       7.9       170       127        60
OIR    2025250     91400   19.6800 -113.0000       7.9       170       125        60
OIR    2025250     91400   19.6800 -113.0100       7.8       171       123        60
OIR    2025250     91400   19.6800 -113.0200       7.8       171       123        60
OIR    2025250     91400   19.6800 -113.0300       7.8       171       123        60
OIR    2025250     91400   19.6800 -113.0400       7.8       171       123        60
OIR    2025250     91400   19.6800 -113.0500       7.8       171       123        60
OIR    2025250     91400   19.6800 -113.0600       7.8       171       121        60
OIR    2025250     91400   19.6800 -113.0700       7.8       171       119        60
OIR    2025250     91400   19.6800 -113.0800       7.8       171       119        60
OIR    2025250     91400   19.6800 -113.0900       7.8       171       120        60
OIR    2025250     91400   19.6800 -113.1000       7.8       171       121        60
OIR    2025250     91400   19.6800 -113.1100       7.8       171       122        60
OIR    2025250     91400   19.6800 -113.1200       7.8       171       123        60
OIR    2025250     91400   19.6800 -113.1300       7.8       171       123        60
OIR    2025250     91400   19.6800 -113.1400       7.8       171       123        60
OIR    2025250     91400   19.6800 -113.1500       7.8       171       121        60
OIR    2025250     91400   19.6800 -113.1600       7.8       171       120        60
OIR    2025250     91400   19.6800 -113.1700       7.8       171       117        60
OIR    2025250     91400   19.6800 -113.1800       7.8       171       116        60
OIR    2025250     91400   19.6800 -113.1900       7.8       171       116        60
OIR    2025250     91400   19.6800 -113.2000       7.8       171       116        60
OIR    2025250     91400   19.6800 -113.2100       7.8       171       116        60
OIR    2025250     91400   19.6800 -113.2200       7.8       171       115        60
OIR    2025250     91400   19.6800 -113.2300       7.8       171       113        60
OIR    2025250     91400   19.6800 -113.2400       7.8       171       112        60
OIR    2025250     91400   19.6800 -113.2500       7.8       171       110        60
OIR    2025250     91400   19.6800 -113.2600       7.8       171       109        60
OIR    2025250     91400   19.6800 -113.2700       7.9       171       109        60
OIR    2025250     91400   19.6800 -113.2800       7.9       170       108        60
OIR    2025250     91400   19.6800 -113.2900       7.9       170       107        60
OIR    2025250     91400   19.6800 -113.3000       8.0       170       107        60
OIR    2025250     91400   19.6800 -113.3100       8.0       170       105        60
OIR    2025250     91400   19.6800 -113.3200       8.0       170       104        60
OIR    2025250     91400   19.6800 -113.3300       8.0       170       104        60
OIR    2025250     91400   19.6800 -113.3400       8.0       170       104        60
OIR    2025250     91400   19.6800 -113.3500       8.0       170       104        60
OIR    2025250     91400   19.6800 -113.3600       8.0       170       104        60
OIR    2025250     91400   19.6800 -113.3700       8.0       170       103        60
OIR    2025250     91400   19.6800 -113.3800       8.1       170       103        60
OIR    2025250     91400   19.6800 -113.3900       8.1       170       103        60
OIR    2025250     91400   19.6800 -113.4000       8.1       170       103        60
OIR    2025250     91400   19.6800 -113.4100       8.1       170       103        60
OIR    2025250     91400   19.6800 -113.4200       8.1       170       103        60
OIR    2025250     91400   19.6800 -113.4300       8.1       170       103        60
OIR    2025250     91400   19.6800 -113.4400       8.2       170       103        60
OIR    2025250     91400   19.6800 -113.4500       8.2       170       103        60
OIR    2025250     91400   19.6800 -113.4600       8.2       170       103        60
OIR    2025250     91400   19.6800 -113.4700       8.2       170       103        60
OIR    2025250     91400   19.6800 -113.4800       8.3       170       103        60
OIR    2025250     91400   19.6800 -113.4900       8.3       170       103        60
OIR    2025250     91400   19.6800 -113.5000       8.3       170       103        60
OIR    2025250     91400   19.6800 -113.5100       8.3       170       103        60
OIR    2025250     91400   19.6800 -113.5200       8.3       170       103        60
OIR    2025250     91400   19.6800 -113.5300       8.4       170       103        60
OIR    2025250     91400   19.6800 -113.5400       8.4       170       104        60
OIR    2025250     91400   19.6800 -113.5500       8.4       170       104        60
OIR    2025250     91400   19.6800 -113.5600       8.4       171       104        60
OIR    2025250     91400   19.6800 -113.5700       8.4       171       104        60
OIR    2025250     91400   19.6800 -113.5800       8.5       171       104        60
OIR    2025250     91400   19.6800 -113.5900       8.5       172       104        60
OIR    2025250     91400   19.6800 -113.6000       8.5       172       104        60
OIR    2025250     91400   19.6800 -113.6100       8.6       173       104        60
OIR    2025250     91400   19.6800 -113.6200       8.6       174       104        60
OIR    2025250     91400   19.6800 -113.6300       8.6       174       103        60
OIR    2025250     91400   19.6800 -113.6400       8.6       174       103        60
OIR    2025250     91400   19.6800 -113.6500       8.6       174       103        60
OIR    2025250     91400   19.6800 -113.6600       8.6       175       103        60
OIR    2025250     91400   19.6800 -113.6700       8.7       175       103        60
OIR    2025250     91400   19.6800 -113.6800       8.7       175       103        60
OIR    2025250     91400   19.6800 -113.6900       8.7       175       103        60
OIR    2025250     91400   19.6800 -113.7000       8.7       175       103        60
OIR    2025250     91400   19.6800 -113.7100       8.8       176       103        60
OIR    2025250     91400   19.6800 -113.7200       8.8       176       104        60
OIR    2025250     91400   19.6800 -113.7300       8.8       176       104        60
OIR    2025250     91400   19.6800 -113.7400       8.8       176       104        60
OIR    2025250     91400   19.6800 -113.7500       8.8       176       104        60
OIR    2025250     91400   19.6800 -113.7600       8.9       176       104        60
OIR    2025250     91400   19.6800 -113.7700       8.9       176       104        60
OIR    2025250     91400   19.6800 -113.7800       8.9       176       104        60
OIR    2025250     91400   19.6800 -113.7900       8.9       176       105        60
OIR    2025250     91400   19.6800 -113.8000       9.0       177       107        60
OIR    2025250     91400   19.6800 -113.8100       9.0       177       107        60
OIR    2025250     91400   19.6800 -113.8200       9.0       177       108        60
OIR    2025250     91400   19.6800 -113.8300       9.0       177       108        60
OIR    2025250     91400   19.6800 -113.8400       9.0       177       108        60
OIR    2025250     91400   19.6800 -113.8500       9.0       178       108        60
OIR    2025250     91400   19.6800 -113.8600       9.0       178       108        60
OIR    2025250     91400   19.6800 -113.8700       9.1       178       108        60
OIR    2025250     91400   19.6800 -113.8800       9.1       178       107        60
OIR    2025250     91400   19.6800 -113.8900       9.1       178       107        60
OIR    2025250     91400   19.6800 -113.9000       9.1       178       107        60
OIR    2025250     91400   19.6800 -113.9100       9.1       179       107        60
OIR    2025250     91400   19.6800 -113.9200       9.1       179       105        60
OIR    2025250     91400   19.6800 -113.9300       9.1       179       105        60
OIR    2025250     91400   19.6800 -113.9400       9.1       179       105        60
OIR    2025250     91400   19.6800 -113.9500       9.1       179       105        60
OIR    2025250     91400   19.6800 -113.9600       9.1       179       105        60
OIR    2025250     91400   19.6800 -113.9700       9.1       179       104        60
OIR    2025250     91400   19.6800 -113.9800       9.1       179       104        60
OIR    2025250     91400   19.6800 -113.9900       9.1       179       105        60
OIR    2025250     91400   19.6800 -114.0000       9.0       179       107        60
OIR    2025250     91400   19.6800 -114.0100       9.0       179       107        60
OIR    2025250     91400   19.6800 -114.0200       9.0       180       107        60
OIR    2025250     91400   19.6800 -114.0300       9.0       180       107        60
OIR    2025250     91400   19.6800 -114.0400       9.0       180       108        60
OIR    2025250     91400   19.6800 -114.0500       8.9       181       108        60
OIR    2025250     91400   19.6800 -114.0600       8.9       182       108        60
OIR    2025250     91400   19.6800 -114.0700       8.9       183       108        60
OIR    2025250     91400   19.6800 -114.0800       8.9       184       108        60
OIR    2025250     91400   19.6800 -114.0900       8.9       185       108        60
OIR    2025250     91400   19.6800 -114.1000       8.8       186       108        60
OIR    2025250     91400   19.6800 -114.1100       8.8       186       108        60
OIR    2025250     91400   19.6800 -114.1200       8.8       187       108        60
OIR    2025250     91400   19.6800 -114.1300       8.8       189       109        60
OIR    2025250     91400   19.6800 -114.1400       8.8       190       109        60
OIR    2025250     91400   19.6800 -114.1500       8.7       191       109        60
OIR    2025250     91400   19.6800 -114.1600       8.7       192       109        60
OIR    2025250     91400   19.6800 -114.1700       8.6       193       109        60
OIR    2025250     91400   19.6800 -114.1800       8.6       195       109        60
OIR    2025250     91400   19.6800 -114.1900       8.6       196       109        60
OIR    2025250     91400   19.6800 -114.2000       8.5       197       108        60
OIR    2025250     91400   19.6800 -114.2100       8.5       197       109        60
OIR    2025250     91400   19.6800 -114.2200       8.5       197       109        60
OIR    2025250     91400   19.6800 -114.2300       8.5       197       110        60
OIR    2025250     91400   19.6800 -114.2400       8.5       198       111        60
OIR    2025250     91400   19.6800 -114.2500       8.4       199       111        60
OIR    2025250     91400   19.6800 -114.2600       8.4       201       111        60
OIR    2025250     91400   19.6800 -114.2700       8.2       205       111        60
OIR    2025250     91400   19.6800 -114.2800       8.2       210       112        60
OIR    2025250     91400   19.6800 -114.2900       8.3       213       114        60
OIR    2025250     91400   19.6800 -114.3000       8.5       216       115        60
OIR    2025250     91400   19.6800 -114.3100       8.5       218       116        60
OIR    2025250     91400   19.6800 -114.3200       8.6       218       116        60
OIR    2025250     91400   19.6800 -114.3300       8.6       219       116        60
OIR    2025250     91400   19.6800 -114.3400       8.6       219       116        60
OIR    2025250     91400   19.6800 -114.3500       8.6       219       116        60
OIR    2025250     91400   19.6800 -114.3600       8.6       219       115        60
OIR    2025250     91400   19.6800 -114.3700       8.6       219       115        60
OIR    2025250     91400   19.6800 -114.3800       8.6       219       114        60
OIR    2025250     91400   19.6800 -114.3900       8.6       219       115        60
OIR    2025250     91400   19.6800 -114.4000       8.6       219       116        60
OIR    2025250     91400   19.6800 -114.4100       8.6       219       116        60
OIR    2025250     91400   19.6800 -114.4200       8.6       219       120        60
OIR    2025250     91400   19.6800 -114.4300       8.6       219       123        60
OIR    2025250     91400   19.6800 -114.4400       8.6       219       124        60
OIR    2025250     91400   19.6800 -114.4500       8.6       219       126        60
OIR    2025250     91400   19.6800 -114.4600       8.6       219       125        60
OIR    2025250     91400   19.6800 -114.4700       8.5       219       125        60
OIR    2025250     91400   19.6800 -114.4800       8.5       218       124        60
OIR    2025250     91400   19.6800 -114.4900       8.4       217       125        60
OIR    2025250     91400   19.6800 -114.5000       7.9       214       125        60
OIR    2025250     91400   19.6800 -114.5100       7.2       207       125        60
OIR    2025250     91400   19.6800 -114.5200       6.7       199       125        60
OIR    2025250     91400   19.6800 -114.5300       6.3       190       125        60
OIR    2025250     91400   19.6800 -114.5400       6.2       185       126        60
OIR    2025250     91400   19.6800 -114.5500       6.1       181       126        60
OIR    2025250     91400   19.6800 -114.5600       6.1       178       127        60
OIR    2025250     91400   19.6800 -114.5700       6.1       175       127        60
OIR    2025250     91400   19.6800 -114.5800       6.1       173       127        60
OIR    2025250     91400   19.6800 -114.5900       6.2       172       127        60
OIR    2025250     91400   19.6800 -114.6000       6.2       172       129        60
OIR    2025250     91400   19.6800 -114.6100       6.2       171       131        60
OIR    2025250     91400   19.6800 -114.6200       6.3       171       133        60
OIR    2025250     91400   19.6800 -114.6300       6.3       171       134        60
OIR    2025250     91400   19.6800 -114.6400       6.3       170       135        60
OIR    2025250     91400   19.6800 -114.6500       6.3       170       136        60
OIR    2025250     91400   19.6800 -114.6600       6.3       170       137        60
OIR    2025250     91400   19.6800 -114.6700       6.3       170       138        60
OIR    2025250     91400   19.6800 -114.6800       6.3       170       139        60
OIR    2025250     91400   19.6800 -114.6900       6.3       170       141        60
OIR    2025250     91400   19.6800 -115.8600       6.6       183       140        60
OIR    2025250     91400   19.6800 -115.8700       7.1       181       137        60
OIR    2025250     91400   19.6800 -115.8800       7.6       181       135        60
OIR    2025250     91400   19.6800 -115.8900       8.0       180       135        60
OIR    2025250     91400   19.6800 -115.9000       8.3       179       135        60
OIR    2025250     91400   19.6800 -115.9100       8.6       178       133        60
OIR    2025250     91400   19.6800 -115.9200       8.9       177       131        60
OIR    2025250     91400   19.6800 -115.9300       9.1       176       130        60
OIR    2025250     91400   19.6800 -115.9400       9.4       176       130        60
OIR    2025250     91400   19.6800 -115.9500       9.5       175       134        60
OIR    2025250     91400   19.6800 -115.9600       9.7       175       138        60
OIR    2025250     91400   19.6800 -115.9700       9.9       174       138        60
OIR    2025250     91400   19.6800 -115.9800      10.1       174       136        60
OIR    2025250     91400   19.6800 -115.9900      10.2       174       136        60
OIR    2025250     91400   19.6800 -116.0000      10.3       175       138        60
OIR    2025250     91400   19.6800 -116.0100      10.5       175       140        60
OIR    2025250     91400   19.6800 -116.0200      10.7       175       139        60
OIR    2025250     91400   19.6800 -116.0300      10.8       176       138        60
OIR    2025250     91400   19.6800 -116.0400      10.8       176       138        60
OIR    2025250     91400   19.6800 -116.0500      10.9       176       138        60
OIR    2025250     91400   19.6800 -116.0600      11.0       176       140        60
OIR    2025250     91400   19.6800 -116.0700      11.0       176       142        60
OIR    2025250     91400   19.6800 -116.0900      11.1       176       142        60
OIR    2025250     91400   19.6800 -116.1000      11.1       176       142        60
OIR    2025250     91400   19.6800 -116.1900      11.4       176       142        60
OIR    2025250     91400   19.6800 -117.7000       4.2        40       140        60
OIR    2025250     91400   19.6800 -117.7100       5.6        24       141        60
OIR    2025250     91400   19.6800 -117.7200       6.5        19       140        60
OIR    2025250     91400   19.6800 -117.7300       6.8        17       139        60
OIR    2025250     91400   19.6800 -117.7400       7.0        17       141        60
OIR    2025250     91400   19.6800 -117.9700       6.2        25       141        60
OIR    2025250     91400   19.6800 -117.9800       6.0        31       141        60
OIR    2025250     91400   19.6800 -117.9900       5.7        38       141        60
OIR    2025250     91400   19.6800 -118.0000       5.5        44       142        60
OIR    2025250     91400   19.6800 -118.0100       5.4        52       141        60
OIR    2025250     91400   19.6800 -118.0200       5.2        57       140        60
OIR    2025250     91400   19.6800 -118.0300       5.2        59       139        60
OIR    2025250     91400   19.6800 -118.0400       5.4        62       138        60
OIR    2025250     91400   19.6800 -118.0500       5.6        64       136        60
OIR    2025250     91400   19.6800 -118.0600       5.9        66       134        60
OIR    2025250     91400   19.6800 -118.0700       6.2        69       133        60
OIR    2025250     91400   19.6800 -118.0800       6.4        71       132        60
OIR    2025250     91400   19.6800 -118.0900       6.6        72       133        60
OIR    2025250     91400   19.6800 -118.1000       6.7        73       133        60
OIR    2025250     91400   19.6800 -118.1100       6.8        73       134        60
OIR    2025250     91400   19.6800 -118.1200       6.8        73       135        60
OIR    2025250     91400   19.6800 -118.1300       6.8        73       136        60
OIR    2025250     91400   19.6800 -118.1400       6.8        73       139        60
OIR    2025250     91400   19.6800 -118.1500       6.8        73       141        60
OIR    2025250     91400   19.6700 -112.2800       7.6        97       140        60
OIR    2025250     91400   19.6700 -112.7800       8.2       165       140        60
OIR    2025250     91400   19.6700 -112.7900       8.1       167       139        60
OIR    2025250     91400   19.6700 -112.8000       8.0       168       138        60
OIR    2025250     91400   19.6700 -112.8100       8.0       169       137        60
OIR    2025250     91400   19.6700 -112.8200       8.0       169       137        60
OIR    2025250     91400   19.6700 -112.8300       7.9       170       137        60
OIR    2025250     91400   19.6700 -112.8400       7.9       170       137        60
OIR    2025250     91400   19.6700 -112.8500       7.9       170       137        60
OIR    2025250     91400   19.6700 -112.8600       7.9       170       135        60
OIR    2025250     91400   19.6700 -112.8700       7.9       170       135        60
OIR    2025250     91400   19.6700 -112.8800       7.9       170       135        60
OIR    2025250     91400   19.6700 -112.8900       7.9       170       135        60
OIR    2025250     91400   19.6700 -112.9000       7.9       170       136        60
OIR    2025250     91400   19.6700 -112.9100       7.9       170       137        60
OIR    2025250     91400   19.6700 -112.9200       7.9       170       137        60
OIR    2025250     91400   19.6700 -112.9300       7.9       170       137        60
OIR    2025250     91400   19.6700 -112.9400       7.9       170       136        60
OIR    2025250     91400   19.6700 -112.9500       7.9       170       134        60
OIR    2025250     91400   19.6700 -112.9600       7.9       170       133        60
OIR    2025250     91400   19.6700 -112.9700       7.9       170       131        60
OIR    2025250     91400   19.6700 -112.9800       7.9       170       129        60
OIR    2025250     91400   19.6700 -112.9900       7.8       171       128        60
OIR    2025250     91400   19.6700 -113.0000       7.8       171       127        60
OIR    2025250     91400   19.6700 -113.0100       7.8       171       125        60
OIR    2025250     91400   19.6700 -113.0200       7.8       171       124        60
OIR    2025250     91400   19.6700 -113.0300       7.8       171       124        60
OIR    2025250     91400   19.6700 -113.0400       7.8       171       124        60
OIR    2025250     91400   19.6700 -113.0500       7.8       171       125        60
OIR    2025250     91400   19.6700 -113.0600       7.8       171       123        60
OIR    2025250     91400   19.6700 -113.0700       7.8       171       121        60
OIR    2025250     91400   19.6700 -113.0800       7.8       171       121        60
OIR    2025250     91400   19.6700 -113.0900       7.8       171       122        60
OIR    2025250     91400   19.6700 -113.1000       7.8       171       122        60
OIR    2025250     91400   19.6700 -113.1100       7.8       171       122        60
OIR    2025250     91400   19.6700 -113.1200       7.8       171       123        60
OIR    2025250     91400   19.6700 -113.1300       7.8       171       122        60
OIR    2025250     91400   19.6700 -113.1400       7.8       171       121        60
OIR    2025250     91400   19.6700 -113.1500       7.8       171       120        60
OIR    2025250     91400   19.6700 -113.1600       7.8       171       119        60
OIR    2025250     91400   19.6700 -113.1700       7.8       171       116        60
OIR    2025250     91400   19.6700 -113.1800       7.8       171       116        60
OIR    2025250     91400   19.6700 -113.1900       7.8       171       116        60
OIR    2025250     91400   19.6700 -113.2000       7.8       171       116        60
OIR    2025250     91400   19.6700 -113.2100       7.8       171       116        60
OIR    2025250     91400   19.6700 -113.2200       7.8       171       115        60
OIR    2025250     91400   19.6700 -113.2300       7.8       171       113        60
OIR    2025250     91400   19.6700 -113.2400       7.8       171       111        60
OIR    2025250     91400   19.6700 -113.2500       7.8       171       110        60
OIR    2025250     91400   19.6700 -113.2600       7.8       171       109        60
OIR    2025250     91400   19.6700 -113.2700       7.8       171       108        60
OIR    2025250     91400   19.6700 -113.2800       7.9       171       108        60
OIR    2025250     91400   19.6700 -113.2900       7.9       171       107        60
OIR    2025250     91400   19.6700 -113.3000       7.9       171       105        60
OIR    2025250     91400   19.6700 -113.3100       8.0       170       104        60
OIR    2025250     91400   19.6700 -113.3200       8.0       170       104        60
OIR    2025250     91400   19.6700 -113.3300       8.0       171       103        60
OIR    2025250     91400   19.6700 -113.3400       8.0       171       104        60
OIR    2025250     91400   19.6700 -113.3500       8.0       171       104        60
OIR    2025250     91400   19.6700 -113.3600       8.0       171       104        60
OIR    2025250     91400   19.6700 -113.3700       8.0       171       103        60
OIR    2025250     91400   19.6700 -113.3800       8.1       171       103        60
OIR    2025250     91400   19.6700 -113.3900       8.1       171       103        60
OIR    2025250     91400   19.6700 -113.4000       8.1       171       103        60
OIR    2025250     91400   19.6700 -113.4100       8.1       171       103        60
OIR    2025250     91400   19.6700 -113.4200       8.1       171       103        60
OIR    2025250     91400   19.6700 -113.4300       8.1       171       103        60
OIR    2025250     91400   19.6700 -113.4400       8.2       170       103        60
OIR    2025250     91400   19.6700 -113.4500       8.2       170       103        60
OIR    2025250     91400   19.6700 -113.4600       8.2       170       103        60
OIR    2025250     91400   19.6700 -113.4700       8.2       170       103        60
OIR    2025250     91400   19.6700 -113.4800       8.3       170       103        60
OIR    2025250     91400   19.6700 -113.4900       8.3       170       103        60
OIR    2025250     91400   19.6700 -113.5000       8.3       170       103        60
OIR    2025250     91400   19.6700 -113.5100       8.3       170       103        60
OIR    2025250     91400   19.6700 -113.5200       8.4       170       103        60
OIR    2025250     91400   19.6700 -113.5300       8.4       170       103        60
OIR    2025250     91400   19.6700 -113.5400       8.4       171       103        60
OIR    2025250     91400   19.6700 -113.5500       8.4       171       103        60
OIR    2025250     91400   19.6700 -113.5600       8.4       171       103        60
OIR    2025250     91400   19.6700 -113.5700       8.5       172       103        60
OIR    2025250     91400   19.6700 -113.5800       8.5       172       103        60
OIR    2025250     91400   19.6700 -113.5900       8.5       173       104        60
OIR    2025250     91400   19.6700 -113.6000       8.5       173       104        60
OIR    2025250     91400   19.6700 -113.6100       8.6       174       104        60
OIR    2025250     91400   19.6700 -113.6200       8.6       174       104        60
OIR    2025250     91400   19.6700 -113.6300       8.6       174       103        60
OIR    2025250     91400   19.6700 -113.6400       8.6       174       103        60
OIR    2025250     91400   19.6700 -113.6500       8.6       175       103        60
OIR    2025250     91400   19.6700 -113.6600       8.7       175       103        60
OIR    2025250     91400   19.6700 -113.6700       8.7       175       103        60
OIR    2025250     91400   19.6700 -113.6800       8.7       175       103        60
OIR    2025250     91400   19.6700 -113.6900       8.7       175       103        60
OIR    2025250     91400   19.6700 -113.7000       8.8       176       103        60
OIR    2025250     91400   19.6700 -113.7100       8.8       176       103        60
OIR    2025250     91400   19.6700 -113.7200       8.8       176       103        60
OIR    2025250     91400   19.6700 -113.7300       8.8       176       103        60
OIR    2025250     91400   19.6700 -113.7400       8.8       176       104        60
OIR    2025250     91400   19.6700 -113.7500       8.9       176       104        60
OIR    2025250     91400   19.6700 -113.7600       8.9       176       104        60
OIR    2025250     91400   19.6700 -113.7700       8.9       176       104        60
OIR    2025250     91400   19.6700 -113.7800       8.9       176       104        60
OIR    2025250     91400   19.6700 -113.7900       8.9       177       105        60
OIR    2025250     91400   19.6700 -113.8000       9.0       177       105        60
OIR    2025250     91400   19.6700 -113.8100       9.0       177       107        60
OIR    2025250     91400   19.6700 -113.8200       9.0       177       107        60
OIR    2025250     91400   19.6700 -113.8300       9.0       177       107        60
OIR    2025250     91400   19.6700 -113.8400       9.0       177       108        60
OIR    2025250     91400   19.6700 -113.8500       9.0       178       108        60
OIR    2025250     91400   19.6700 -113.8600       9.0       178       109        60
OIR    2025250     91400   19.6700 -113.8700       9.1       178       108        60
OIR    2025250     91400   19.6700 -113.8800       9.1       178       107        60
OIR    2025250     91400   19.6700 -113.8900       9.1       178       107        60
OIR    2025250     91400   19.6700 -113.9000       9.1       179       105        60
OIR    2025250     91400   19.6700 -113.9100       9.1       179       105        60
OIR    2025250     91400   19.6700 -113.9200       9.1       179       105        60
OIR    2025250     91400   19.6700 -113.9300       9.1       179       105        60
OIR    2025250     91400   19.6700 -113.9400       9.1       179       105        60
OIR    2025250     91400   19.6700 -113.9500       9.1       179       105        60
OIR    2025250     91400   19.6700 -113.9600       9.1       179       104        60
OIR    2025250     91400   19.6700 -113.9700       9.1       179       104        60
OIR    2025250     91400   19.6700 -113.9800       9.1       179       104        60
OIR    2025250     91400   19.6700 -113.9900       9.1       179       105        60
OIR    2025250     91400   19.6700 -114.0000       9.0       179       107        60
OIR    2025250     91400   19.6700 -114.0100       9.0       179       107        60
OIR    2025250     91400   19.6700 -114.0200       9.0       180       107        60
OIR    2025250     91400   19.6700 -114.0300       9.0       180       107        60
OIR    2025250     91400   19.6700 -114.0400       9.0       180       108        60
OIR    2025250     91400   19.6700 -114.0500       8.9       181       108        60
OIR    2025250     91400   19.6700 -114.0600       8.9       182       108        60
OIR    2025250     91400   19.6700 -114.0700       8.9       183       108        60
OIR    2025250     91400   19.6700 -114.0800       8.8       184       108        60
OIR    2025250     91400   19.6700 -114.0900       8.8       185       108        60
OIR    2025250     91400   19.6700 -114.1000       8.8       186       108        60
OIR    2025250     91400   19.6700 -114.1100       8.8       186       108        60
OIR    2025250     91400   19.6700 -114.1200       8.8       187       109        60
OIR    2025250     91400   19.6700 -114.1300       8.7       188       109        60
OIR    2025250     91400   19.6700 -114.1400       8.7       189       110        60
OIR    2025250     91400   19.6700 -114.1500       8.7       190       109        60
OIR    2025250     91400   19.6700 -114.1600       8.6       191       109        60
OIR    2025250     91400   19.6700 -114.1700       8.6       193       110        60
OIR    2025250     91400   19.6700 -114.1800       8.6       195       110        60
OIR    2025250     91400   19.6700 -114.1900       8.6       196       110        60
OIR    2025250     91400   19.6700 -114.2000       8.5       196       109        60
OIR    2025250     91400   19.6700 -114.2100       8.5       197       109        60
OIR    2025250     91400   19.6700 -114.2200       8.5       197       110        60
OIR    2025250     91400   19.6700 -114.2300       8.5       197       110        60
OIR    2025250     91400   19.6700 -114.2400       8.5       198       110        60
OIR    2025250     91400   19.6700 -114.2500       8.5       199       111        60
OIR    2025250     91400   19.6700 -114.2600       8.4       200       111        60
OIR    2025250     91400   19.6700 -114.2700       8.3       203       112        60
OIR    2025250     91400   19.6700 -114.2800       8.3       208       113        60
OIR    2025250     91400   19.6700 -114.2900       8.3       212       114        60
OIR    2025250     91400   19.6700 -114.3000       8.5       216       115        60
OIR    2025250     91400   19.6700 -114.3100       8.5       218       116        60
OIR    2025250     91400   19.6700 -114.3200       8.6       218       116        60
OIR    2025250     91400   19.6700 -114.3300       8.6       219       116        60
OIR    2025250     91400   19.6700 -114.3400       8.6       219       116        60
OIR    2025250     91400   19.6700 -114.3500       8.6       219       116        60
OIR    2025250     91400   19.6700 -114.3600       8.6       219       115        60
OIR    2025250     91400   19.6700 -114.3700       8.6       219       114        60
OIR    2025250     91400   19.6700 -114.3800       8.6       219       114        60
OIR    2025250     91400   19.6700 -114.3900       8.6       219       114        60
OIR    2025250     91400   19.6700 -114.4000       8.6       219       116        60
OIR    2025250     91400   19.6700 -114.4100       8.6       219       116        60
OIR    2025250     91400   19.6700 -114.4200       8.6       219       120        60
OIR    2025250     91400   19.6700 -114.4300       8.6       219       123        60
OIR    2025250     91400   19.6700 -114.4400       8.6       219       125        60
OIR    2025250     91400   19.6700 -114.4500       8.6       219       126        60
OIR    2025250     91400   19.6700 -114.4600       8.6       219       127        60
OIR    2025250     91400   19.6700 -114.4700       8.5       219       126        60
OIR    2025250     91400   19.6700 -114.4800       8.5       218       125        60
OIR    2025250     91400   19.6700 -114.4900       8.5       218       125        60
OIR    2025250     91400   19.6700 -114.5000       8.2       216       125        60
OIR    2025250     91400   19.6700 -114.5100       7.6       211       125        60
OIR    2025250     91400   19.6700 -114.5200       6.9       202       125        60
OIR    2025250     91400   19.6700 -114.5300       6.4       190       125        60
OIR    2025250     91400   19.6700 -114.5400       6.3       185       126        60
OIR    2025250     91400   19.6700 -114.5500       6.2       180       126        60
OIR    2025250     91400   19.6700 -114.5600       6.2       177       127        60
OIR    2025250     91400   19.6700 -114.5700       6.2       174       127        60
OIR    2025250     91400   19.6700 -114.5800       6.2       173       127        60
OIR    2025250     91400   19.6700 -114.5900       6.2       172       128        60
OIR    2025250     91400   19.6700 -114.6000       6.2       171       130        60
OIR    2025250     91400   19.6700 -114.6100       6.3       171       133        60
OIR    2025250     91400   19.6700 -114.6200       6.3       171       134        60
OIR    2025250     91400   19.6700 -114.6300       6.4       170       135        60
OIR    2025250     91400   19.6700 -114.6400       6.4       170       136        60
OIR    2025250     91400   19.6700 -114.6500       6.4       170       137        60
OIR    2025250     91400   19.6700 -114.6600       6.4       170       138        60
OIR    2025250     91400   19.6700 -114.6700       6.4       170       139        60
OIR    2025250     91400   19.6700 -114.6800       6.4       170       140        60
OIR    2025250     91400   19.6700 -115.8600       6.8       186       141        60
OIR    2025250     91400   19.6700 -115.8700       7.4       182       137        60
OIR    2025250     91400   19.6700 -115.8800       7.8       182       134        60
OIR    2025250     91400   19.6700 -115.8900       8.2       180       134        60
OIR    2025250     91400   19.6700 -115.9000       8.5       179       134        60
OIR    2025250     91400   19.6700 -115.9100       8.8       179       133        60
OIR    2025250     91400   19.6700 -115.9200       9.1       178       131        60
OIR    2025250     91400   19.6700 -115.9300       9.3       177       130        60
OIR    2025250     91400   19.6700 -115.9400       9.5       176       130        60
OIR    2025250     91400   19.6700 -115.9500       9.7       176       132        60
OIR    2025250     91400   19.6700 -115.9600       9.8       175       136        60
OIR    2025250     91400   19.6700 -115.9700      10.0       175       137        60
OIR    2025250     91400   19.6700 -115.9800      10.1       175       136        60
OIR    2025250     91400   19.6700 -115.9900      10.2       175       135        60
OIR    2025250     91400   19.6700 -116.0000      10.3       175       137        60
OIR    2025250     91400   19.6700 -116.0100      10.5       175       138        60
OIR    2025250     91400   19.6700 -116.0200      10.6       176       137        60
OIR    2025250     91400   19.6700 -116.0300      10.8       176       137        60
OIR    2025250     91400   19.6700 -116.0400      10.8       176       137        60
OIR    2025250     91400   19.6700 -116.0500      10.9       176       138        60
OIR    2025250     91400   19.6700 -116.0600      10.9       176       139        60
OIR    2025250     91400   19.6700 -116.0700      11.0       176       140        60
OIR    2025250     91400   19.6700 -116.0800      11.0       176       141        60
OIR    2025250     91400   19.6700 -116.0900      11.1       176       142        60
OIR    2025250     91400   19.6700 -116.1000      11.1       176       142        60
OIR    2025250     91400   19.6700 -116.1100      11.2       176       143        60
OIR    2025250     91400   19.6700 -117.7000       4.7        34       142        60
OIR    2025250     91400   19.6700 -117.7200       6.6        18       143        60
OIR    2025250     91400   19.6700 -117.7300       6.9        17       141        60
OIR    2025250     91400   19.6700 -117.7400       7.1        16       140        60
OIR    2025250     91400   19.6700 -117.7500       7.4        15       140        60
OIR    2025250     91400   19.6700 -117.9600       6.4        24       142        60
OIR    2025250     91400   19.6700 -117.9700       6.3        28       139        60
OIR    2025250     91400   19.6700 -117.9800       6.2        34       139        60
OIR    2025250     91400   19.6700 -117.9900       6.1        39       139        60
OIR    2025250     91400   19.6700 -118.0000       5.9        44       139        60
OIR    2025250     91400   19.6700 -118.0100       5.9        51       139        60
OIR    2025250     91400   19.6700 -118.0200       5.8        57       138        60
OIR    2025250     91400   19.6700 -118.0300       5.7        61       137        60
OIR    2025250     91400   19.6700 -118.0400       5.9        63       136        60
OIR    2025250     91400   19.6700 -118.0500       6.1        66       135        60
OIR    2025250     91400   19.6700 -118.0600       6.2        67       133        60
OIR    2025250     91400   19.6700 -118.0700       6.5        69       133        60
OIR    2025250     91400   19.6700 -118.0800       6.7        71       132        60
OIR    2025250     91400   19.6700 -118.0900       6.8        72       133        60
OIR    2025250     91400   19.6700 -118.1000       6.8        73       133        60
OIR    2025250     91400   19.6700 -118.1100       6.9        73       134        60
OIR    2025250     91400   19.6700 -118.1200       6.9        73       136        60
OIR    2025250     91400   19.6700 -118.1300       6.9        74       137        60
OIR    2025250     91400   19.6700 -118.1400       7.0        74       140        60
OIR    2025250     91400   19.6600 -112.2800       7.7        97       139        60
OIR    2025250     91400   19.6600 -112.2900       7.8        97       139        60
OIR    2025250     91400   19.6600 -112.8000       8.0       169       139        60
OIR    2025250     91400   19.6600 -112.8100       8.0       170       138        60
OIR    2025250     91400   19.6600 -112.8200       8.0       170       137        60
OIR    2025250     91400   19.6600 -112.8300       7.9       170       137        60
OIR    2025250     91400   19.6600 -112.8400       7.9       170       138        60
OIR    2025250     91400   19.6600 -112.8500       7.9       170       137        60
OIR    2025250     91400   19.6600 -112.8600       7.9       170       136        60
OIR    2025250     91400   19.6600 -112.8700       7.9       170       136        60
OIR    2025250     91400   19.6600 -112.8800       7.9       170       135        60
OIR    2025250     91400   19.6600 -112.8900       7.9       170       135        60
OIR    2025250     91400   19.6600 -112.9000       7.9       170       136        60
OIR    2025250     91400   19.6600 -112.9100       7.9       170       138        60
OIR    2025250     91400   19.6600 -112.9200       7.9       170       138        60
OIR    2025250     91400   19.6600 -112.9300       7.9       170       137        60
OIR    2025250     91400   19.6600 -112.9400       7.9       170       136        60
OIR    2025250     91400   19.6600 -112.9500       7.9       170       134        60
OIR    2025250     91400   19.6600 -112.9600       7.9       170       133        60
OIR    2025250     91400   19.6600 -112.9700       7.9       171       131        60
OIR    2025250     91400   19.6600 -112.9800       7.9       171       129        60
OIR    2025250     91400   19.6600 -112.9900       7.8       171       128        60
OIR    2025250     91400   19.6600 -113.0000       7.8       171       128        60
OIR    2025250     91400   19.6600 -113.0100       7.8       171       128        60
OIR    2025250     91400   19.6600 -113.0200       7.8       171       126        60
OIR    2025250     91400   19.6600 -113.0300       7.8       171       124        60
OIR    2025250     91400   19.6600 -113.0400       7.8       171       125        60
OIR    2025250     91400   19.6600 -113.0500       7.8       171       126        60
OIR    2025250     91400   19.6600 -113.0600       7.8       171       125        60
OIR    2025250     91400   19.6600 -113.0700       7.8       172       124        60
OIR    2025250     91400   19.6600 -113.0800       7.8       172       123        60
OIR    2025250     91400   19.6600 -113.0900       7.8       172       123        60
OIR    2025250     91400   19.6600 -113.1000       7.8       172       123        60
OIR    2025250     91400   19.6600 -113.1100       7.8       172       123        60
OIR    2025250     91400   19.6600 -113.1200       7.8       172       123        60
OIR    2025250     91400   19.6600 -113.1300       7.8       172       121        60
OIR    2025250     91400   19.6600 -113.1400       7.8       172       117        60
OIR    2025250     91400   19.6600 -113.1500       7.8       172       116        60
OIR    2025250     91400   19.6600 -113.1600       7.8       171       116        60
OIR    2025250     91400   19.6600 -113.1700       7.8       171       116        60
OIR    2025250     91400   19.6600 -113.1800       7.8       171       116        60
OIR    2025250     91400   19.6600 -113.1900       7.8       171       116        60
OIR    2025250     91400   19.6600 -113.2000       7.7       171       116        60
OIR    2025250     91400   19.6600 -113.2100       7.7       171       116        60
OIR    2025250     91400   19.6600 -113.2200       7.8       171       115        60
OIR    2025250     91400   19.6600 -113.2300       7.8       171       113        60
OIR    2025250     91400   19.6600 -113.2400       7.8       171       111        60
OIR    2025250     91400   19.6600 -113.2500       7.8       171       110        60
OIR    2025250     91400   19.6600 -113.2600       7.8       171       109        60
OIR    2025250     91400   19.6600 -113.2700       7.8       171       108        60
OIR    2025250     91400   19.6600 -113.2800       7.8       171       108        60
OIR    2025250     91400   19.6600 -113.2900       7.9       171       107        60
OIR    2025250     91400   19.6600 -113.3000       7.9       171       105        60
OIR    2025250     91400   19.6600 -113.3100       7.9       171       104        60
OIR    2025250     91400   19.6600 -113.3200       7.9       171       104        60
OIR    2025250     91400   19.6600 -113.3300       8.0       171       103        60
OIR    2025250     91400   19.6600 -113.3400       8.0       171       103        60
OIR    2025250     91400   19.6600 -113.3500       8.0       171       103        60
OIR    2025250     91400   19.6600 -113.3600       8.0       171       103        60
OIR    2025250     91400   19.6600 -113.3700       8.0       171       103        60
OIR    2025250     91400   19.6600 -113.3800       8.0       171       103        60
OIR    2025250     91400   19.6600 -113.3900       8.1       171       103        60
OIR    2025250     91400   19.6600 -113.4000       8.1       171       103        60
OIR    2025250     91400   19.6600 -113.4100       8.1       171       103        60
OIR    2025250     91400   19.6600 -113.4200       8.1       171       103        60
OIR    2025250     91400   19.6600 -113.4300       8.1       171       103        60
OIR    2025250     91400   19.6600 -113.4400       8.2       171       103        60
OIR    2025250     91400   19.6600 -113.4500       8.2       171       103        60
OIR    2025250     91400   19.6600 -113.4600       8.2       171       103        60
OIR    2025250     91400   19.6600 -113.4700       8.2       171       103        60
OIR    2025250     91400   19.6600 -113.4800       8.3       170       103        60
OIR    2025250     91400   19.6600 -113.4900       8.3       170       103        60
OIR    2025250     91400   19.6600 -113.5000       8.3       171       103        60
OIR    2025250     91400   19.6600 -113.5100       8.3       171       103        60
OIR    2025250     91400   19.6600 -113.5200       8.4       171       103        60
OIR    2025250     91400   19.6600 -113.5300       8.4       171       103        60
OIR    2025250     91400   19.6600 -113.5400       8.4       171       103        60
OIR    2025250     91400   19.6600 -113.5500       8.4       172       103        60
OIR    2025250     91400   19.6600 -113.5600       8.5       172       103        60
OIR    2025250     91400   19.6600 -113.5700       8.5       172       103        60
OIR    2025250     91400   19.6600 -113.5800       8.5       173       103        60
OIR    2025250     91400   19.6600 -113.5900       8.5       173       103        60
OIR    2025250     91400   19.6600 -113.6000       8.6       174       104        60
OIR    2025250     91400   19.6600 -113.6100       8.6       174       104        60
OIR    2025250     91400   19.6600 -113.6200       8.6       174       104        60
OIR    2025250     91400   19.6600 -113.6300       8.6       174       103        60
OIR    2025250     91400   19.6600 -113.6400       8.6       175       103        60
OIR    2025250     91400   19.6600 -113.6500       8.7       175       103        60
OIR    2025250     91400   19.6600 -113.6600       8.7       175       103        60
OIR    2025250     91400   19.6600 -113.6700       8.7       175       103        60
OIR    2025250     91400   19.6600 -113.6800       8.7       175       103        60
OIR    2025250     91400   19.6600 -113.6900       8.7       176       103        60
OIR    2025250     91400   19.6600 -113.7000       8.8       176       104        60
OIR    2025250     91400   19.6600 -113.7100       8.8       176       104        60
OIR    2025250     91400   19.6600 -113.7200       8.8       176       103        60
OIR    2025250     91400   19.6600 -113.7300       8.8       176       103        60
OIR    2025250     91400   19.6600 -113.7400       8.8       176       103        60
OIR    2025250     91400   19.6600 -113.7500       8.9       176       103        60
OIR    2025250     91400   19.6600 -113.7600       8.9       176       104        60
OIR    2025250     91400   19.6600 -113.7700       8.9       176       104        60
OIR    2025250     91400   19.6600 -113.7800       8.9       177       104        60
OIR    2025250     91400   19.6600 -113.7900       9.0       177       104        60
OIR    2025250     91400   19.6600 -113.8000       9.0       177       105        60
OIR    2025250     91400   19.6600 -113.8100       9.0       177       105        60
OIR    2025250     91400   19.6600 -113.8200       9.0       177       105        60
OIR    2025250     91400   19.6600 -113.8300       9.0       177       105        60
OIR    2025250     91400   19.6600 -113.8400       9.0       177       107        60
OIR    2025250     91400   19.6600 -113.8500       9.1       178       108        60
OIR    2025250     91400   19.6600 -113.8600       9.1       178       110        60
OIR    2025250     91400   19.6600 -113.8700       9.1       178       109        60
OIR    2025250     91400   19.6600 -113.8800       9.1       178       108        60
OIR    2025250     91400   19.6600 -113.8900       9.1       179       107        60
OIR    2025250     91400   19.6600 -113.9000       9.1       179       105        60
OIR    2025250     91400   19.6600 -113.9100       9.1       179       104        60
OIR    2025250     91400   19.6600 -113.9200       9.1       179       105        60
OIR    2025250     91400   19.6600 -113.9300       9.1       179       105        60
OIR    2025250     91400   19.6600 -113.9400       9.1       179       105        60
OIR    2025250     91400   19.6600 -113.9500       9.1       179       105        60
OIR    2025250     91400   19.6600 -113.9600       9.1       179       104        60
OIR    2025250     91400   19.6600 -113.9700       9.1       179       104        60
OIR    2025250     91400   19.6600 -113.9800       9.1       179       104        60
OIR    2025250     91400   19.6600 -113.9900       9.1       179       104        60
OIR    2025250     91400   19.6600 -114.0000       9.0       179       107        60
OIR    2025250     91400   19.6600 -114.0100       9.0       180       107        60
OIR    2025250     91400   19.6600 -114.0200       9.0       180       107        60
OIR    2025250     91400   19.6600 -114.0300       9.0       180       107        60
OIR    2025250     91400   19.6600 -114.0400       9.0       181       108        60
OIR    2025250     91400   19.6600 -114.0500       8.9       181       108        60
OIR    2025250     91400   19.6600 -114.0600       8.9       182       108        60
OIR    2025250     91400   19.6600 -114.0700       8.8       183       108        60
OIR    2025250     91400   19.6600 -114.0800       8.8       184       108        60
OIR    2025250     91400   19.6600 -114.0900       8.8       185       108        60
OIR    2025250     91400   19.6600 -114.1000       8.8       185       108        60
OIR    2025250     91400   19.6600 -114.1100       8.8       186       108        60
OIR    2025250     91400   19.6600 -114.1200       8.7       187       108        60
OIR    2025250     91400   19.6600 -114.1300       8.7       188       108        60
OIR    2025250     91400   19.6600 -114.1400       8.7       189       109        60
OIR    2025250     91400   19.6600 -114.1500       8.6       190       109        60
OIR    2025250     91400   19.6600 -114.1600       8.6       191       109        60
OIR    2025250     91400   19.6600 -114.1700       8.6       192       110        60
OIR    2025250     91400   19.6600 -114.1800       8.6       194       110        60
OIR    2025250     91400   19.6600 -114.1900       8.5       196       110        60
OIR    2025250     91400   19.6600 -114.2000       8.5       196       110        60
OIR    2025250     91400   19.6600 -114.2100       8.5       197       110        60
OIR    2025250     91400   19.6600 -114.2200       8.5       197       110        60
OIR    2025250     91400   19.6600 -114.2300       8.5       197       111        60
OIR    2025250     91400   19.6600 -114.2400       8.5       198       110        60
OIR    2025250     91400   19.6600 -114.2500       8.5       198       110        60
OIR    2025250     91400   19.6600 -114.2600       8.4       200       111        60
OIR    2025250     91400   19.6600 -114.2700       8.3       202       112        60
OIR    2025250     91400   19.6600 -114.2800       8.3       206       113        60
OIR    2025250     91400   19.6600 -114.2900       8.3       211       114        60
OIR    2025250     91400   19.6600 -114.3000       8.5       215       115        60
OIR    2025250     91400   19.6600 -114.3100       8.5       218       116        60
OIR    2025250     91400   19.6600 -114.3200       8.6       219       116        60
OIR    2025250     91400   19.6600 -114.3300       8.6       219       116        60
OIR    2025250     91400   19.6600 -114.3400       8.6       219       116        60
OIR    2025250     91400   19.6600 -114.3500       8.6       219       116        60
OIR    2025250     91400   19.6600 -114.3600       8.6       219       115        60
OIR    2025250     91400   19.6600 -114.3700       8.6       219       114        60
OIR    2025250     91400   19.6600 -114.3800       8.6       219       113        60
OIR    2025250     91400   19.6600 -114.3900       8.6       219       114        60
OIR    2025250     91400   19.6600 -114.4000       8.6       219       115        60
OIR    2025250     91400   19.6600 -114.4100       8.6       219       116        60
OIR    2025250     91400   19.6600 -114.4200       8.6       219       120        60
OIR    2025250     91400   19.6600 -114.4300       8.6       219       123        60
OIR    2025250     91400   19.6600 -114.4400       8.6       219       125        60
OIR    2025250     91400   19.6600 -114.4500       8.6       219       126        60
OIR    2025250     91400   19.6600 -114.4600       8.6       219       128        60
OIR    2025250     91400   19.6600 -114.4700       8.5       219       127        60
OIR    2025250     91400   19.6600 -114.4800       8.5       219       126        60
OIR    2025250     91400   19.6600 -114.4900       8.5       218       126        60
OIR    2025250     91400   19.6600 -114.5000       8.3       217       125        60
OIR    2025250     91400   19.6600 -114.5100       8.0       214       125        60
OIR    2025250     91400   19.6600 -114.5200       7.2       205       126        60
OIR    2025250     91400   19.6600 -114.5300       6.5       189       126        60
OIR    2025250     91400   19.6600 -114.5400       6.3       184       126        60
OIR    2025250     91400   19.6600 -114.5500       6.3       180       126        60
OIR    2025250     91400   19.6600 -114.5600       6.3       176       127        60
OIR    2025250     91400   19.6600 -114.5700       6.3       174       127        60
OIR    2025250     91400   19.6600 -114.5800       6.3       172       128        60
OIR    2025250     91400   19.6600 -114.5900       6.3       172       129        60
OIR    2025250     91400   19.6600 -114.6000       6.3       171       130        60
OIR    2025250     91400   19.6600 -114.6100       6.4       171       132        60
OIR    2025250     91400   19.6600 -114.6200       6.4       170       134        60
OIR    2025250     91400   19.6600 -114.6300       6.4       170       134        60
OIR    2025250     91400   19.6600 -114.6400       6.4       170       135        60
OIR    2025250     91400   19.6600 -114.6500       6.4       170       137        60
OIR    2025250     91400   19.6600 -114.6600       6.4       170       139        60
OIR    2025250     91400   19.6600 -114.6700       6.4       170       139        60
OIR    2025250     91400   19.6600 -114.6800       6.4       170       140        60
OIR    2025250     91400   19.6600 -115.8700       7.7       184       137        60
OIR    2025250     91400   19.6600 -115.8800       8.1       182       133        60
OIR    2025250     91400   19.6600 -115.8900       8.5       181       132        60
OIR    2025250     91400   19.6600 -115.9000       8.7       180       132        60
OIR    2025250     91400   19.6600 -115.9100       9.0       179       132        60
OIR    2025250     91400   19.6600 -115.9200       9.2       178       131        60
OIR    2025250     91400   19.6600 -115.9300       9.4       177       130        60
OIR    2025250     91400   19.6600 -115.9400       9.6       177       130        60
OIR    2025250     91400   19.6600 -115.9500       9.8       176       131        60
OIR    2025250     91400   19.6600 -115.9600      10.0       176       135        60
OIR    2025250     91400   19.6600 -115.9700      10.1       176       137        60
OIR    2025250     91400   19.6600 -115.9800      10.2       176       135        60
OIR    2025250     91400   19.6600 -115.9900      10.3       176       134        60
OIR    2025250     91400   19.6600 -116.0000      10.4       176       137        60
OIR    2025250     91400   19.6600 -116.0100      10.5       176       140        60
OIR    2025250     91400   19.6600 -116.0200      10.6       176       140        60
OIR    2025250     91400   19.6600 -116.0300      10.7       176       138        60
OIR    2025250     91400   19.6600 -116.0400      10.8       176       138        60
OIR    2025250     91400   19.6600 -116.0500      10.9       176       138        60
OIR    2025250     91400   19.6600 -116.0600      10.9       176       138        60
OIR    2025250     91400   19.6600 -116.0700      10.9       176       140        60
OIR    2025250     91400   19.6600 -116.0800      11.0       176       141        60
OIR    2025250     91400   19.6600 -116.0900      11.0       176       142        60
OIR    2025250     91400   19.6600 -116.1000      11.1       176       143        60
OIR    2025250     91400   19.6600 -117.6500       4.0        78       140        60
OIR    2025250     91400   19.6600 -117.6600       4.0        72       139        60
OIR    2025250     91400   19.6600 -117.6900       4.2        46       139        60
OIR    2025250     91400   19.6600 -117.7000       5.1        30       142        60
OIR    2025250     91400   19.6600 -117.7200       6.7        17       144        60
OIR    2025250     91400   19.6600 -117.7300       6.9        16       141        60
OIR    2025250     91400   19.6600 -117.7400       7.1        15       140        60
OIR    2025250     91400   19.6600 -117.7500       7.5        12       138        60
OIR    2025250     91400   19.6600 -117.7600       7.7         8       140        60
OIR    2025250     91400   19.6600 -117.9300       6.7        19       142        60
OIR    2025250     91400   19.6600 -117.9400       6.6        22       142        60
OIR    2025250     91400   19.6600 -117.9600       6.5        28       140        60
OIR    2025250     91400   19.6600 -117.9700       6.4        32       138        60
OIR    2025250     91400   19.6600 -117.9800       6.3        37       136        60
OIR    2025250     91400   19.6600 -117.9900       6.3        41       137        60
OIR    2025250     91400   19.6600 -118.0000       6.2        45       137        60
OIR    2025250     91400   19.6600 -118.0100       6.2        53       136        60
OIR    2025250     91400   19.6600 -118.0200       6.2        58       136        60
OIR    2025250     91400   19.6600 -118.0300       6.2        62       135        60
OIR    2025250     91400   19.6600 -118.0400       6.2        64       134        60
OIR    2025250     91400   19.6600 -118.0500       6.3        66       133        60
OIR    2025250     91400   19.6600 -118.0600       6.5        68       133        60
OIR    2025250     91400   19.6600 -118.0700       6.8        70       133        60
OIR    2025250     91400   19.6600 -118.0800       6.9        71       132        60
OIR    2025250     91400   19.6600 -118.0900       7.0        72       133        60
OIR    2025250     91400   19.6600 -118.1000       7.0        72       135        60
OIR    2025250     91400   19.6600 -118.1100       7.1        73       137        60
OIR    2025250     91400   19.6600 -118.1200       7.1        74       137        60
OIR    2025250     91400   19.6600 -118.1300       7.2        75       138        60
OIR    2025250     91400   19.6600 -118.1400       7.3        75       140        60
OIR    2025250     91400   19.6500 -112.1000       9.4        93       141        60
OIR    2025250     91400   19.6500 -112.2800       7.8        97       138        60
OIR    2025250     91400   19.6500 -112.2900       7.9        97       137        60
OIR    2025250     91400   19.6500 -112.3000       7.9        98       139        60
OIR    2025250     91400   19.6500 -112.8100       8.0       170       140        60
OIR    2025250     91400   19.6500 -112.8200       7.9       170       139        60
OIR    2025250     91400   19.6500 -112.8300       7.9       170       138        60
OIR    2025250     91400   19.6500 -112.8400       7.9       170       138        60
OIR    2025250     91400   19.6500 -112.8500       7.9       171       138        60
OIR    2025250     91400   19.6500 -112.8600       7.9       171       137        60
OIR    2025250     91400   19.6500 -112.8700       7.9       171       136        60
OIR    2025250     91400   19.6500 -112.8800       7.8       171       136        60
OIR    2025250     91400   19.6500 -112.8900       7.8       171       135        60
OIR    2025250     91400   19.6500 -112.9000       7.8       171       136        60
OIR    2025250     91400   19.6500 -112.9100       7.8       171       138        60
OIR    2025250     91400   19.6500 -112.9200       7.9       171       139        60
OIR    2025250     91400   19.6500 -112.9300       7.9       171       138        60
OIR    2025250     91400   19.6500 -112.9400       7.9       171       137        60
OIR    2025250     91400   19.6500 -112.9500       7.9       171       135        60
OIR    2025250     91400   19.6500 -112.9600       7.9       171       133        60
OIR    2025250     91400   19.6500 -112.9700       7.9       172       132        60
OIR    2025250     91400   19.6500 -112.9800       7.8       172       130        60
OIR    2025250     91400   19.6500 -112.9900       7.8       172       129        60
OIR    2025250     91400   19.6500 -113.0000       7.8       172       129        60
OIR    2025250     91400   19.6500 -113.0100       7.8       172       129        60
OIR    2025250     91400   19.6500 -113.0200       7.8       172       128        60
OIR    2025250     91400   19.6500 -113.0300       7.8       172       126        60
OIR    2025250     91400   19.6500 -113.0400       7.8       172       124        60
OIR    2025250     91400   19.6500 -113.0500       7.8       172       123        60
OIR    2025250     91400   19.6500 -113.0600       7.8       172       123        60
OIR    2025250     91400   19.6500 -113.0700       7.8       172       122        60
OIR    2025250     91400   19.6500 -113.0800       7.8       172       122        60
OIR    2025250     91400   19.6500 -113.0900       7.8       172       123        60
OIR    2025250     91400   19.6500 -113.1000       7.8       172       124        60
OIR    2025250     91400   19.6500 -113.1100       7.8       172       124        60
OIR    2025250     91400   19.6500 -113.1200       7.8       172       123        60
OIR    2025250     91400   19.6500 -113.1300       7.8       172       122        60
OIR    2025250     91400   19.6500 -113.1400       7.8       172       120        60
OIR    2025250     91400   19.6500 -113.1500       7.8       172       119        60
OIR    2025250     91400   19.6500 -113.1600       7.8       172       117        60
OIR    2025250     91400   19.6500 -113.1700       7.8       172       116        60
OIR    2025250     91400   19.6500 -113.1800       7.8       172       116        60
OIR    2025250     91400   19.6500 -113.1900       7.8       172       116        60
OIR    2025250     91400   19.6500 -113.2000       7.7       172       116        60
OIR    2025250     91400   19.6500 -113.2100       7.7       172       116        60
OIR    2025250     91400   19.6500 -113.2200       7.7       172       115        60
OIR    2025250     91400   19.6500 -113.2300       7.7       172       113        60
OIR    2025250     91400   19.6500 -113.2400       7.8       172       112        60
OIR    2025250     91400   19.6500 -113.2500       7.8       172       110        60
OIR    2025250     91400   19.6500 -113.2600       7.8       172       109        60
OIR    2025250     91400   19.6500 -113.2700       7.8       171       108        60
OIR    2025250     91400   19.6500 -113.2800       7.8       171       108        60
OIR    2025250     91400   19.6500 -113.2900       7.8       171       107        60
OIR    2025250     91400   19.6500 -113.3000       7.9       171       105        60
OIR    2025250     91400   19.6500 -113.3100       7.9       171       104        60
OIR    2025250     91400   19.6500 -113.3200       7.9       171       104        60
OIR    2025250     91400   19.6500 -113.3300       8.0       171       103        60
OIR    2025250     91400   19.6500 -113.3400       8.0       171       103        60
OIR    2025250     91400   19.6500 -113.3500       8.0       171       103        60
OIR    2025250     91400   19.6500 -113.3600       8.0       171       103        60
OIR    2025250     91400   19.6500 -113.3700       8.0       171       103        60
OIR    2025250     91400   19.6500 -113.3800       8.0       171       103        60
OIR    2025250     91400   19.6500 -113.3900       8.1       171       103        60
OIR    2025250     91400   19.6500 -113.4000       8.1       171       103        60
OIR    2025250     91400   19.6500 -113.4100       8.1       171       103        60
OIR    2025250     91400   19.6500 -113.4200       8.1       171       103        60
OIR    2025250     91400   19.6500 -113.4300       8.1       171       103        60
OIR    2025250     91400   19.6500 -113.4400       8.2       171       103        60
OIR    2025250     91400   19.6500 -113.4500       8.2       171       103        60
OIR    2025250     91400   19.6500 -113.4600       8.2       171       103        60
OIR    2025250     91400   19.6500 -113.4700       8.2       171       103        60
OIR    2025250     91400   19.6500 -113.4800       8.3       171       103        60
OIR    2025250     91400   19.6500 -113.4900       8.3       171       103        60
OIR    2025250     91400   19.6500 -113.5000       8.3       171       103        60
OIR    2025250     91400   19.6500 -113.5100       8.4       171       103        60
OIR    2025250     91400   19.6500 -113.5200       8.4       171       103        60
OIR    2025250     91400   19.6500 -113.5300       8.4       171       103        60
OIR    2025250     91400   19.6500 -113.5400       8.4       172       103        60
OIR    2025250     91400   19.6500 -113.5500       8.5       172       103        60
OIR    2025250     91400   19.6500 -113.5600       8.5       172       103        60
OIR    2025250     91400   19.6500 -113.5700       8.5       173       103        60
OIR    2025250     91400   19.6500 -113.5800       8.5       173       103        60
OIR    2025250     91400   19.6500 -113.5900       8.6       174       103        60
OIR    2025250     91400   19.6500 -113.6000       8.6       174       103        60
OIR    2025250     91400   19.6500 -113.6100       8.6       174       104        60
OIR    2025250     91400   19.6500 -113.6200       8.6       174       103        60
OIR    2025250     91400   19.6500 -113.6300       8.6       175       103        60
OIR    2025250     91400   19.6500 -113.6400       8.7       175       103        60
OIR    2025250     91400   19.6500 -113.6500       8.7       175       103        60
OIR    2025250     91400   19.6500 -113.6600       8.7       175       103        60
OIR    2025250     91400   19.6500 -113.6700       8.7       175       103        60
OIR    2025250     91400   19.6500 -113.6800       8.8       176       103        60
OIR    2025250     91400   19.6500 -113.6900       8.8       176       103        60
OIR    2025250     91400   19.6500 -113.7000       8.8       176       103        60
OIR    2025250     91400   19.6500 -113.7100       8.8       176       103        60
OIR    2025250     91400   19.6500 -113.7200       8.8       176       103        60
OIR    2025250     91400   19.6500 -113.7300       8.8       176       103        60
OIR    2025250     91400   19.6500 -113.7400       8.8       176       103        60
OIR    2025250     91400   19.6500 -113.7500       8.9       176       104        60
OIR    2025250     91400   19.6500 -113.7600       8.9       176       104        60
OIR    2025250     91400   19.6500 -113.7700       8.9       176       104        60
OIR    2025250     91400   19.6500 -113.7800       8.9       177       104        60
OIR    2025250     91400   19.6500 -113.7900       9.0       177       105        60
OIR    2025250     91400   19.6500 -113.8000       9.0       177       105        60
OIR    2025250     91400   19.6500 -113.8100       9.0       177       105        60
OIR    2025250     91400   19.6500 -113.8200       9.0       177       105        60
OIR    2025250     91400   19.6500 -113.8300       9.0       177       105        60
OIR    2025250     91400   19.6500 -113.8400       9.1       178       107        60
OIR    2025250     91400   19.6500 -113.8500       9.1       178       108        60
OIR    2025250     91400   19.6500 -113.8600       9.1       178       109        60
OIR    2025250     91400   19.6500 -113.8700       9.1       178       109        60
OIR    2025250     91400   19.6500 -113.8800       9.1       179       108        60
OIR    2025250     91400   19.6500 -113.8900       9.1       179       107        60
OIR    2025250     91400   19.6500 -113.9000       9.1       179       105        60
OIR    2025250     91400   19.6500 -113.9100       9.1       179       104        60
OIR    2025250     91400   19.6500 -113.9200       9.1       179       104        60
OIR    2025250     91400   19.6500 -113.9300       9.1       179       105        60
OIR    2025250     91400   19.6500 -113.9400       9.1       179       105        60
OIR    2025250     91400   19.6500 -113.9500       9.1       179       105        60
OIR    2025250     91400   19.6500 -113.9600       9.1       179       104        60
OIR    2025250     91400   19.6500 -113.9700       9.1       179       104        60
OIR    2025250     91400   19.6500 -113.9800       9.1       179       104        60
OIR    2025250     91400   19.6500 -113.9900       9.1       179       104        60
OIR    2025250     91400   19.6500 -114.0000       9.0       180       105        60
OIR    2025250     91400   19.6500 -114.0100       9.0       180       105        60
OIR    2025250     91400   19.6500 -114.0200       9.0       180       107        60
OIR    2025250     91400   19.6500 -114.0300       9.0       180       108        60
OIR    2025250     91400   19.6500 -114.0400       8.9       181       108        60
OIR    2025250     91400   19.6500 -114.0500       8.9       182       108        60
OIR    2025250     91400   19.6500 -114.0600       8.8       183       107        60
OIR    2025250     91400   19.6500 -114.0700       8.8       183       107        60
OIR    2025250     91400   19.6500 -114.0800       8.8       184       108        60
OIR    2025250     91400   19.6500 -114.0900       8.8       185       109        60
OIR    2025250     91400   19.6500 -114.1000       8.8       185       108        60
OIR    2025250     91400   19.6500 -114.1100       8.7       186       107        60
OIR    2025250     91400   19.6500 -114.1200       8.7       187       105        60
OIR    2025250     91400   19.6500 -114.1300       8.7       188       107        60
OIR    2025250     91400   19.6500 -114.1400       8.6       189       107        60
OIR    2025250     91400   19.6500 -114.1500       8.6       190       108        60
OIR    2025250     91400   19.6500 -114.1600       8.6       190       109        60
OIR    2025250     91400   19.6500 -114.1700       8.6       191       110        60
OIR    2025250     91400   19.6500 -114.1800       8.5       194       110        60
OIR    2025250     91400   19.6500 -114.1900       8.5       195       110        60
OIR    2025250     91400   19.6500 -114.2000       8.5       196       110        60
OIR    2025250     91400   19.6500 -114.2100       8.5       197       110        60
OIR    2025250     91400   19.6500 -114.2200       8.5       197       110        60
OIR    2025250     91400   19.6500 -114.2300       8.5       197       110        60
OIR    2025250     91400   19.6500 -114.2400       8.5       198       110        60
OIR    2025250     91400   19.6500 -114.2500       8.5       198       110        60
OIR    2025250     91400   19.6500 -114.2600       8.4       199       111        60
OIR    2025250     91400   19.6500 -114.2700       8.4       201       112        60
OIR    2025250     91400   19.6500 -114.2800       8.3       204       113        60
OIR    2025250     91400   19.6500 -114.2900       8.3       209       114        60
OIR    2025250     91400   19.6500 -114.3000       8.4       214       115        60
OIR    2025250     91400   19.6500 -114.3100       8.5       218       116        60
OIR    2025250     91400   19.6500 -114.3200       8.5       219       116        60
OIR    2025250     91400   19.6500 -114.3300       8.5       219       116        60
OIR    2025250     91400   19.6500 -114.3400       8.5       219       116        60
OIR    2025250     91400   19.6500 -114.3500       8.6       219       116        60
OIR    2025250     91400   19.6500 -114.3600       8.6       219       115        60
OIR    2025250     91400   19.6500 -114.3700       8.6       219       114        60
OIR    2025250     91400   19.6500 -114.3800       8.6       219       114        60
OIR    2025250     91400   19.6500 -114.3900       8.6       219       114        60
OIR    2025250     91400   19.6500 -114.4000       8.6       219       115        60
OIR    2025250     91400   19.6500 -114.4100       8.6       219       115        60
OIR    2025250     91400   19.6500 -114.4200       8.6       219       117        60
OIR    2025250     91400   19.6500 -114.4300       8.6       219       122        60
OIR    2025250     91400   19.6500 -114.4400       8.6       219       125        60
OIR    2025250     91400   19.6500 -114.4500       8.6       219       127        60
OIR    2025250     91400   19.6500 -114.4600       8.6       219       128        60
OIR    2025250     91400   19.6500 -114.4700       8.5       219       127        60
OIR    2025250     91400   19.6500 -114.4800       8.5       219       126        60
OIR    2025250     91400   19.6500 -114.4900       8.5       218       126        60
OIR    2025250     91400   19.6500 -114.5000       8.4       218       126        60
OIR    2025250     91400   19.6500 -114.5100       8.2       216       126        60
OIR    2025250     91400   19.6500 -114.5200       7.5       208       126        60
OIR    2025250     91400   19.6500 -114.5300       6.6       191       127        60
OIR    2025250     91400   19.6500 -114.5400       6.4       184       127        60
OIR    2025250     91400   19.6500 -114.5500       6.4       179       127        60
OIR    2025250     91400   19.6500 -114.5600       6.4       175       127        60
OIR    2025250     91400   19.6500 -114.5700       6.4       173       128        60
OIR    2025250     91400   19.6500 -114.5800       6.4       172       128        60
OIR    2025250     91400   19.6500 -114.5900       6.4       171       129        60
OIR    2025250     91400   19.6500 -114.6000       6.4       171       130        60
OIR    2025250     91400   19.6500 -114.6100       6.4       171       132        60
OIR    2025250     91400   19.6500 -114.6200       6.4       170       134        60
OIR    2025250     91400   19.6500 -114.6300       6.4       170       134        60
OIR    2025250     91400   19.6500 -114.6400       6.4       170       134        60
OIR    2025250     91400   19.6500 -114.6500       6.4       170       136        60
OIR    2025250     91400   19.6500 -114.6600       6.4       170       139        60
OIR    2025250     91400   19.6500 -114.6700       6.4       170       140        60
OIR    2025250     91400   19.6500 -114.6800       6.4       170       140        60
OIR    2025250     91400   19.6500 -114.6900       6.4       170       141        60
OIR    2025250     91400   19.6500 -115.8700       8.0       185       138        60
OIR    2025250     91400   19.6500 -115.8800       8.4       183       133        60
OIR    2025250     91400   19.6500 -115.8900       8.7       181       132        60
OIR    2025250     91400   19.6500 -115.9000       9.0       180       131        60
OIR    2025250     91400   19.6500 -115.9100       9.2       179       131        60
OIR    2025250     91400   19.6500 -115.9200       9.4       178       131        60
OIR    2025250     91400   19.6500 -115.9300       9.6       178       131        60
OIR    2025250     91400   19.6500 -115.9400       9.8       177       130        60
OIR    2025250     91400   19.6500 -115.9500      10.0       177       131        60
OIR    2025250     91400   19.6500 -115.9600      10.1       177       133        60
OIR    2025250     91400   19.6500 -115.9700      10.2       177       136        60
OIR    2025250     91400   19.6500 -115.9800      10.3       176       135        60
OIR    2025250     91400   19.6500 -115.9900      10.4       176       134        60
OIR    2025250     91400   19.6500 -116.0000      10.5       176       137        60
OIR    2025250     91400   19.6500 -116.0100      10.5       176       141        60
OIR    2025250     91400   19.6500 -116.0200      10.6       176       142        60
OIR    2025250     91400   19.6500 -116.0300      10.7       177       140        60
OIR    2025250     91400   19.6500 -116.0400      10.8       177       139        60
OIR    2025250     91400   19.6500 -116.0500      10.8       177       138        60
OIR    2025250     91400   19.6500 -116.0600      10.9       176       138        60
OIR    2025250     91400   19.6500 -116.0700      10.9       176       139        60
OIR    2025250     91400   19.6500 -116.0800      10.9       176       141        60
OIR    2025250     91400   19.6500 -116.0900      11.0       176       142        60
OIR    2025250     91400   19.6500 -116.2800      14.4       189       141        60
OIR    2025250     91400   19.6500 -116.2900      14.2       188       139        60
OIR    2025250     91400   19.6500 -116.3000      14.1       189       137        60
OIR    2025250     91400   19.6500 -117.6500       4.3        64       142        60
OIR    2025250     91400   19.6500 -117.6600       4.5        61       142        60
OIR    2025250     91400   19.6500 -117.6700       4.3        58       142        60
OIR    2025250     91400   19.6500 -117.6800       4.2        52       141        60
OIR    2025250     91400   19.6500 -117.6900       4.5        40       140        60
OIR    2025250     91400   19.6500 -117.7000       5.4        26       141        60
OIR    2025250     91400   19.6500 -117.7100       6.2        19       143        60
OIR    2025250     91400   19.6500 -117.7200       6.8        17       144        60
OIR    2025250     91400   19.6500 -117.7300       7.0        15       142        60
OIR    2025250     91400   19.6500 -117.7400       7.1        14       140        60
OIR    2025250     91400   19.6500 -117.7500       7.5        10       139        60
OIR    2025250     91400   19.6500 -117.7600       7.7         7       139        60
OIR    2025250     91400   19.6500 -117.9300       6.6        25       140        60
OIR    2025250     91400   19.6500 -117.9400       6.6        28       140        60
OIR    2025250     91400   19.6500 -117.9500       6.6        29       139        60
OIR    2025250     91400   19.6500 -117.9600       6.5        32       139        60
OIR    2025250     91400   19.6500 -117.9700       6.4        36       137        60
OIR    2025250     91400   19.6500 -117.9800       6.4        39       135        60
OIR    2025250     91400   19.6500 -117.9900       6.4        43       135        60
OIR    2025250     91400   19.6500 -118.0000       6.3        47       135        60
OIR    2025250     91400   19.6500 -118.0100       6.4        55       135        60
OIR    2025250     91400   19.6500 -118.0200       6.4        60       135        60
OIR    2025250     91400   19.6500 -118.0300       6.5        63       134        60
OIR    2025250     91400   19.6500 -118.0400       6.5        65       134        60
OIR    2025250     91400   19.6500 -118.0500       6.6        67       134        60
OIR    2025250     91400   19.6500 -118.0600       6.8        69       134        60
OIR    2025250     91400   19.6500 -118.0700       6.9        70       134        60
OIR    2025250     91400   19.6500 -118.0800       7.0        71       134        60
OIR    2025250     91400   19.6500 -118.0900       7.1        71       135        60
OIR    2025250     91400   19.6500 -118.1000       7.2        72       137        60
OIR    2025250     91400   19.6500 -118.1100       7.3        73       139        60
OIR    2025250     91400   19.6500 -118.1200       7.3        74       139        60
OIR    2025250     91400   19.6500 -118.1300       7.4        75       140        60
OIR    2025250     91400   19.6500 -118.1400       7.5        76       142        60
OIR    2025250     91400   19.6400 -112.1000       9.3        93       140        60
OIR    2025250     91400   19.6400 -112.1100       9.8        92       141        60
OIR    2025250     91400   19.6400 -112.2800       7.9        97       138        60
OIR    2025250     91400   19.6400 -112.2900       7.9        97       135        60
OIR    2025250     91400   19.6400 -112.3000       7.8        98       139        60
OIR    2025250     91400   19.6400 -112.8200       7.8       171       140        60
OIR    2025250     91400   19.6400 -112.8300       7.8       171       140        60
OIR    2025250     91400   19.6400 -112.8400       7.8       171       140        60
OIR    2025250     91400   19.6400 -112.8500       7.8       171       140        60
OIR    2025250     91400   19.6400 -112.8600       7.8       171       139        60
OIR    2025250     91400   19.6400 -112.8700       7.8       172       137        60
OIR    2025250     91400   19.6400 -112.8800       7.8       172       136        60
OIR    2025250     91400   19.6400 -112.8900       7.8       172       136        60
OIR    2025250     91400   19.6400 -112.9000       7.8       172       136        60
OIR    2025250     91400   19.6400 -112.9100       7.8       172       138        60
OIR    2025250     91400   19.6400 -112.9200       7.8       172       139        60
OIR    2025250     91400   19.6400 -112.9300       7.8       172       138        60
OIR    2025250     91400   19.6400 -112.9400       7.8       172       137        60
OIR    2025250     91400   19.6400 -112.9500       7.8       172       135        60
OIR    2025250     91400   19.6400 -112.9600       7.8       172       134        60
OIR    2025250     91400   19.6400 -112.9700       7.8       172       132        60
OIR    2025250     91400   19.6400 -112.9800       7.8       172       131        60
OIR    2025250     91400   19.6400 -112.9900       7.8       172       130        60
OIR    2025250     91400   19.6400 -113.0000       7.8       172       130        60
OIR    2025250     91400   19.6400 -113.0100       7.8       172       130        60
OIR    2025250     91400   19.6400 -113.0200       7.8       172       129        60
OIR    2025250     91400   19.6400 -113.0300       7.8       172       127        60
OIR    2025250     91400   19.6400 -113.0400       7.8       172       125        60
OIR    2025250     91400   19.6400 -113.0500       7.8       172       122        60
OIR    2025250     91400   19.6400 -113.0600       7.8       172       120        60
OIR    2025250     91400   19.6400 -113.0700       7.8       172       120        60
OIR    2025250     91400   19.6400 -113.0800       7.8       172       119        60
OIR    2025250     91400   19.6400 -113.0900       7.8       172       122        60
OIR    2025250     91400   19.6400 -113.1000       7.8       172       124        60
OIR    2025250     91400   19.6400 -113.1100       7.8       172       126        60
OIR    2025250     91400   19.6400 -113.1200       7.8       172       124        60
OIR    2025250     91400   19.6400 -113.1300       7.8       172       123        60
OIR    2025250     91400   19.6400 -113.1400       7.8       172       123        60
OIR    2025250     91400   19.6400 -113.1500       7.8       172       122        60
OIR    2025250     91400   19.6400 -113.1600       7.8       172       120        60
OIR    2025250     91400   19.6400 -113.1700       7.8       172       117        60
OIR    2025250     91400   19.6400 -113.1800       7.8       172       117        60
OIR    2025250     91400   19.6400 -113.1900       7.7       172       119        60
OIR    2025250     91400   19.6400 -113.2000       7.7       172       120        60
OIR    2025250     91400   19.6400 -113.2100       7.7       172       117        60
OIR    2025250     91400   19.6400 -113.2200       7.7       172       116        60
OIR    2025250     91400   19.6400 -113.2300       7.7       172       114        60
OIR    2025250     91400   19.6400 -113.2400       7.7       172       111        60
OIR    2025250     91400   19.6400 -113.2500       7.7       172       110        60
OIR    2025250     91400   19.6400 -113.2600       7.8       172       109        60
OIR    2025250     91400   19.6400 -113.2700       7.8       172       108        60
OIR    2025250     91400   19.6400 -113.2800       7.8       172       108        60
OIR    2025250     91400   19.6400 -113.2900       7.8       171       108        60
OIR    2025250     91400   19.6400 -113.3000       7.9       171       107        60
OIR    2025250     91400   19.6400 -113.3100       7.9       171       104        60
OIR    2025250     91400   19.6400 -113.3200       7.9       171       104        60
OIR    2025250     91400   19.6400 -113.3300       7.9       171       104        60
OIR    2025250     91400   19.6400 -113.3400       8.0       171       103        60
OIR    2025250     91400   19.6400 -113.3500       8.0       171       103        60
OIR    2025250     91400   19.6400 -113.3600       8.0       171       103        60
OIR    2025250     91400   19.6400 -113.3700       8.0       171       103        60
OIR    2025250     91400   19.6400 -113.3800       8.0       171       103        60
OIR    2025250     91400   19.6400 -113.3900       8.1       171       103        60
OIR    2025250     91400   19.6400 -113.4000       8.1       171       103        60
OIR    2025250     91400   19.6400 -113.4100       8.1       171       103        60
OIR    2025250     91400   19.6400 -113.4200       8.1       171       103        60
OIR    2025250     91400   19.6400 -113.4300       8.1       171       103        60
OIR    2025250     91400   19.6400 -113.4400       8.2       171       103        60
OIR    2025250     91400   19.6400 -113.4500       8.2       171       103        60
OIR    2025250     91400   19.6400 -113.4600       8.2       171       103        60
OIR    2025250     91400   19.6400 -113.4700       8.3       171       103        60
OIR    2025250     91400   19.6400 -113.4800       8.3       171       103        60
OIR    2025250     91400   19.6400 -113.4900       8.3       171       103        60
OIR    2025250     91400   19.6400 -113.5000       8.3       171       103        60
OIR    2025250     91400   19.6400 -113.5100       8.4       172       103        60
OIR    2025250     91400   19.6400 -113.5200       8.4       172       103        60
OIR    2025250     91400   19.6400 -113.5300       8.4       172       103        60
OIR    2025250     91400   19.6400 -113.5400       8.5       172       103        60
OIR    2025250     91400   19.6400 -113.5500       8.5       173       103        60
OIR    2025250     91400   19.6400 -113.5600       8.5       173       103        60
OIR    2025250     91400   19.6400 -113.5700       8.5       173       103        60
OIR    2025250     91400   19.6400 -113.5800       8.6       173       103        60
OIR    2025250     91400   19.6400 -113.5900       8.6       174       103        60
OIR    2025250     91400   19.6400 -113.6000       8.6       174       103        60
OIR    2025250     91400   19.6400 -113.6100       8.6       174       103        60
OIR    2025250     91400   19.6400 -113.6200       8.7       175       103        60
OIR    2025250     91400   19.6400 -113.6300       8.7       175       103        60
OIR    2025250     91400   19.6400 -113.6400       8.7       175       103        60
OIR    2025250     91400   19.6400 -113.6500       8.7       175       103        60
OIR    2025250     91400   19.6400 -113.6600       8.7       175       103        60
OIR    2025250     91400   19.6400 -113.6700       8.8       176       103        60
OIR    2025250     91400   19.6400 -113.6800       8.8       176       103        60
OIR    2025250     91400   19.6400 -113.6900       8.8       176       103        60
OIR    2025250     91400   19.6400 -113.7000       8.8       176       103        60
OIR    2025250     91400   19.6400 -113.7100       8.8       176       103        60
OIR    2025250     91400   19.6400 -113.7200       8.8       176       103        60
OIR    2025250     91400   19.6400 -113.7300       8.8       176       103        60
OIR    2025250     91400   19.6400 -113.7400       8.9       176       104        60
OIR    2025250     91400   19.6400 -113.7500       8.9       176       104        60
OIR    2025250     91400   19.6400 -113.7600       8.9       176       104        60
OIR    2025250     91400   19.6400 -113.7700       8.9       177       104        60
OIR    2025250     91400   19.6400 -113.7800       8.9       177       105        60
OIR    2025250     91400   19.6400 -113.7900       9.0       177       107        60
OIR    2025250     91400   19.6400 -113.8000       9.0       177       107        60
OIR    2025250     91400   19.6400 -113.8100       9.0       177       107        60
OIR    2025250     91400   19.6400 -113.8200       9.0       177       107        60
OIR    2025250     91400   19.6400 -113.8300       9.0       177       107        60
OIR    2025250     91400   19.6400 -113.8400       9.1       178       107        60
OIR    2025250     91400   19.6400 -113.8500       9.1       178       108        60
OIR    2025250     91400   19.6400 -113.8600       9.1       178       108        60
OIR    2025250     91400   19.6400 -113.8700       9.1       179       108        60
OIR    2025250     91400   19.6400 -113.8800       9.1       179       107        60
OIR    2025250     91400   19.6400 -113.8900       9.1       179       107        60
OIR    2025250     91400   19.6400 -113.9000       9.1       179       105        60
OIR    2025250     91400   19.6400 -113.9100       9.1       179       104        60
OIR    2025250     91400   19.6400 -113.9200       9.1       179       104        60
OIR    2025250     91400   19.6400 -113.9300       9.1       179       104        60
OIR    2025250     91400   19.6400 -113.9400       9.1       179       104        60
OIR    2025250     91400   19.6400 -113.9500       9.1       179       104        60
OIR    2025250     91400   19.6400 -113.9600       9.1       179       105        60
OIR    2025250     91400   19.6400 -113.9700       9.1       179       104        60
OIR    2025250     91400   19.6400 -113.9800       9.1       179       104        60
OIR    2025250     91400   19.6400 -113.9900       9.1       180       104        60
OIR    2025250     91400   19.6400 -114.0000       9.0       180       104        60
OIR    2025250     91400   19.6400 -114.0100       9.0       180       105        60
OIR    2025250     91400   19.6400 -114.0200       9.0       180       107        60
OIR    2025250     91400   19.6400 -114.0300       9.0       181       108        60
OIR    2025250     91400   19.6400 -114.0400       8.9       181       108        60
OIR    2025250     91400   19.6400 -114.0500       8.9       182       107        60
OIR    2025250     91400   19.6400 -114.0600       8.8       183       107        60
OIR    2025250     91400   19.6400 -114.0700       8.8       184       105        60
OIR    2025250     91400   19.6400 -114.0800       8.8       184       107        60
OIR    2025250     91400   19.6400 -114.0900       8.8       185       108        60
OIR    2025250     91400   19.6400 -114.1000       8.7       185       108        60
OIR    2025250     91400   19.6400 -114.1100       8.7       186       107        60
OIR    2025250     91400   19.6400 -114.1200       8.7       187       105        60
OIR    2025250     91400   19.6400 -114.1300       8.7       188       107        60
OIR    2025250     91400   19.6400 -114.1400       8.6       188       107        60
OIR    2025250     91400   19.6400 -114.1500       8.6       189       108        60
OIR    2025250     91400   19.6400 -114.1600       8.6       190       109        60
OIR    2025250     91400   19.6400 -114.1700       8.5       191       109        60
OIR    2025250     91400   19.6400 -114.1800       8.5       193       109        60
OIR    2025250     91400   19.6400 -114.1900       8.5       195       110        60
OIR    2025250     91400   19.6400 -114.2000       8.5       196       110        60
OIR    2025250     91400   19.6400 -114.2100       8.5       197       110        60
OIR    2025250     91400   19.6400 -114.2200       8.5       197       110        60
OIR    2025250     91400   19.6400 -114.2300       8.5       197       110        60
OIR    2025250     91400   19.6400 -114.2400       8.5       198       110        60
OIR    2025250     91400   19.6400 -114.2500       8.5       198       110        60
OIR    2025250     91400   19.6400 -114.2600       8.4       200       111        60
OIR    2025250     91400   19.6400 -114.2700       8.4       201       112        60
OIR    2025250     91400   19.6400 -114.2800       8.4       203       113        60
OIR    2025250     91400   19.6400 -114.2900       8.3       207       114        60
OIR    2025250     91400   19.6400 -114.3000       8.4       214       115        60
OIR    2025250     91400   19.6400 -114.3100       8.5       218       115        60
OIR    2025250     91400   19.6400 -114.3200       8.5       219       116        60
OIR    2025250     91400   19.6400 -114.3300       8.5       219       116        60
OIR    2025250     91400   19.6400 -114.3400       8.5       219       115        60
OIR    2025250     91400   19.6400 -114.3500       8.5       219       115        60
OIR    2025250     91400   19.6400 -114.3600       8.5       219       114        60
OIR    2025250     91400   19.6400 -114.3700       8.5       219       114        60
OIR    2025250     91400   19.6400 -114.3800       8.5       219       114        60
OIR    2025250     91400   19.6400 -114.3900       8.5       219       115        60
OIR    2025250     91400   19.6400 -114.4000       8.5       219       115        60
OIR    2025250     91400   19.6400 -114.4100       8.5       219       114        60
OIR    2025250     91400   19.6400 -114.4200       8.6       219       116        60
OIR    2025250     91400   19.6400 -114.4300       8.6       219       120        60
OIR    2025250     91400   19.6400 -114.4400       8.6       219       124        60
OIR    2025250     91400   19.6400 -114.4500       8.6       219       127        60
OIR    2025250     91400   19.6400 -114.4600       8.5       219       128        60
OIR    2025250     91400   19.6400 -114.4700       8.5       219       127        60
OIR    2025250     91400   19.6400 -114.4800       8.5       219       125        60
OIR    2025250     91400   19.6400 -114.4900       8.5       219       125        60
OIR    2025250     91400   19.6400 -114.5000       8.5       218       126        60
OIR    2025250     91400   19.6400 -114.5100       8.3       217       127        60
OIR    2025250     91400   19.6400 -114.5200       7.8       210       126        60
OIR    2025250     91400   19.6400 -114.5300       6.8       194       126        60
OIR    2025250     91400   19.6400 -114.5400       6.4       183       127        60
OIR    2025250     91400   19.6400 -114.5500       6.4       177       128        60
OIR    2025250     91400   19.6400 -114.5600       6.4       174       128        60
OIR    2025250     91400   19.6400 -114.5700       6.4       173       128        60
OIR    2025250     91400   19.6400 -114.5800       6.4       172       128        60
OIR    2025250     91400   19.6400 -114.5900       6.4       171       128        60
OIR    2025250     91400   19.6400 -114.6000       6.4       171       129        60
OIR    2025250     91400   19.6400 -114.6100       6.4       170       130        60
OIR    2025250     91400   19.6400 -114.6200       6.4       170       132        60
OIR    2025250     91400   19.6400 -114.6300       6.4       170       133        60
OIR    2025250     91400   19.6400 -114.6400       6.5       170       134        60
OIR    2025250     91400   19.6400 -114.6500       6.5       170       136        60
OIR    2025250     91400   19.6400 -114.6600       6.5       170       138        60
OIR    2025250     91400   19.6400 -114.6700       6.5       170       139        60
OIR    2025250     91400   19.6400 -114.6800       6.5       170       140        60
OIR    2025250     91400   19.6400 -114.6900       6.4       170       141        60
OIR    2025250     91400   19.6400 -115.8600       7.6       188       142        60
OIR    2025250     91400   19.6400 -115.8700       8.3       185       139        60
OIR    2025250     91400   19.6400 -115.8800       8.8       183       135        60
OIR    2025250     91400   19.6400 -115.8900       9.0       182       133        60
OIR    2025250     91400   19.6400 -115.9000       9.3       181       132        60
OIR    2025250     91400   19.6400 -115.9100       9.5       180       131        60
OIR    2025250     91400   19.6400 -115.9200       9.6       179       130        60
OIR    2025250     91400   19.6400 -115.9300       9.8       178       130        60
OIR    2025250     91400   19.6400 -115.9400       9.9       178       131        60
OIR    2025250     91400   19.6400 -115.9500      10.1       177       131        60
OIR    2025250     91400   19.6400 -115.9600      10.2       177       132        60
OIR    2025250     91400   19.6400 -115.9700      10.3       177       133        60
OIR    2025250     91400   19.6400 -115.9800      10.4       177       134        60
OIR    2025250     91400   19.6400 -115.9900      10.4       177       135        60
OIR    2025250     91400   19.6400 -116.0000      10.5       177       136        60
OIR    2025250     91400   19.6400 -116.0100      10.6       177       138        60
OIR    2025250     91400   19.6400 -116.0200      10.6       177       140        60
OIR    2025250     91400   19.6400 -116.0300      10.7       177       142        60
OIR    2025250     91400   19.6400 -116.0400      10.8       177       142        60
OIR    2025250     91400   19.6400 -116.0500      10.8       177       141        60
OIR    2025250     91400   19.6400 -116.0600      10.8       177       140        60
OIR    2025250     91400   19.6400 -116.0700      10.9       177       141        60
OIR    2025250     91400   19.6400 -116.2900      12.4       184       138        60
OIR    2025250     91400   19.6400 -116.3000      12.7       186       134        60
OIR    2025250     91400   19.6400 -116.3100      13.6       191       135        60
OIR    2025250     91400   19.6400 -116.3200      13.6       195       141        60
OIR    2025250     91400   19.6400 -117.6800       4.7        47       144        60
OIR    2025250     91400   19.6400 -117.6900       5.0        36       143        60
OIR    2025250     91400   19.6400 -117.7000       5.8        25       143        60
OIR    2025250     91400   19.6400 -117.7100       6.4        19       143        60
OIR    2025250     91400   19.6400 -117.7200       6.8        16       143        60
OIR    2025250     91400   19.6400 -117.7300       7.1        14       142        60
OIR    2025250     91400   19.6400 -117.7400       7.2        13       141        60
OIR    2025250     91400   19.6400 -117.7500       7.6         9       140        60
OIR    2025250     91400   19.6400 -117.7600       7.8         7       140        60
OIR    2025250     91400   19.6400 -117.8900       7.1        16       141        60
OIR    2025250     91400   19.6400 -117.9000       6.9        20       140        60
OIR    2025250     91400   19.6400 -117.9100       6.7        25       139        60
OIR    2025250     91400   19.6400 -117.9200       6.6        28       139        60
OIR    2025250     91400   19.6400 -117.9300       6.6        29       138        60
OIR    2025250     91400   19.6400 -117.9400       6.6        31       138        60
OIR    2025250     91400   19.6400 -117.9500       6.6        34       137        60
OIR    2025250     91400   19.6400 -117.9600       6.5        36       136        60
OIR    2025250     91400   19.6400 -117.9700       6.5        39       135        60
OIR    2025250     91400   19.6400 -117.9800       6.5        42       134        60
OIR    2025250     91400   19.6400 -117.9900       6.5        44       134        60
OIR    2025250     91400   19.6400 -118.0000       6.5        48       134        60
OIR    2025250     91400   19.6400 -118.0100       6.6        57       134        60
OIR    2025250     91400   19.6400 -118.0200       6.6        61       134        60
OIR    2025250     91400   19.6400 -118.0300       6.7        64       134        60
OIR    2025250     91400   19.6400 -118.0400       6.8        66       134        60
OIR    2025250     91400   19.6400 -118.0500       6.9        68       134        60
OIR    2025250     91400   19.6400 -118.0600       7.0        69       135        60
OIR    2025250     91400   19.6400 -118.0700       7.1        70       136        60
OIR    2025250     91400   19.6400 -118.0800       7.2        70       137        60
OIR    2025250     91400   19.6400 -118.0900       7.2        71       138        60
OIR    2025250     91400   19.6400 -118.1000       7.3        72       139        60
OIR    2025250     91400   19.6400 -118.1100       7.4        73       141        60
OIR    2025250     91400   19.6400 -118.1200       7.5        74       142        60
OIR    2025250     91400   19.6300 -112.1100       9.8        92       140        60
OIR    2025250     91400   19.6300 -112.1200       9.9        92       141        60
OIR    2025250     91400   19.6300 -112.2700       7.9        98       140        60
OIR    2025250     91400   19.6300 -112.2800       8.1        98       137        60
OIR    2025250     91400   19.6300 -112.2900       8.1        98       134        60
OIR    2025250     91400   19.6300 -112.3000       7.4       100       139        60
OIR    2025250     91400   19.6300 -112.8700       7.8       172       138        60
OIR    2025250     91400   19.6300 -112.8800       7.8       172       137        60
OIR    2025250     91400   19.6300 -112.8900       7.8       172       137        60
OIR    2025250     91400   19.6300 -112.9000       7.8       172       137        60
OIR    2025250     91400   19.6300 -112.9100       7.8       172       138        60
OIR    2025250     91400   19.6300 -112.9200       7.8       172       139        60
OIR    2025250     91400   19.6300 -112.9300       7.8       172       138        60
OIR    2025250     91400   19.6300 -112.9400       7.8       172       137        60
OIR    2025250     91400   19.6300 -112.9500       7.8       172       136        60
OIR    2025250     91400   19.6300 -112.9600       7.8       172       134        60
OIR    2025250     91400   19.6300 -112.9700       7.8       172       133        60
OIR    2025250     91400   19.6300 -112.9800       7.8       172       132        60
OIR    2025250     91400   19.6300 -112.9900       7.8       172       131        60
OIR    2025250     91400   19.6300 -113.0000       7.8       172       130        60
OIR    2025250     91400   19.6300 -113.0100       7.8       172       130        60
OIR    2025250     91400   19.6300 -113.0200       7.8       172       130        60
OIR    2025250     91400   19.6300 -113.0300       7.8       172       129        60
OIR    2025250     91400   19.6300 -113.0400       7.8       172       128        60
OIR    2025250     91400   19.6300 -113.0500       7.8       172       125        60
OIR    2025250     91400   19.6300 -113.0600       7.8       172       122        60
OIR    2025250     91400   19.6300 -113.0700       7.8       172       121        60
OIR    2025250     91400   19.6300 -113.0800       7.8       172       120        60
OIR    2025250     91400   19.6300 -113.0900       7.8       172       121        60
OIR    2025250     91400   19.6300 -113.1000       7.8       172       122        60
OIR    2025250     91400   19.6300 -113.1100       7.8       172       123        60
OIR    2025250     91400   19.6300 -113.1200       7.8       172       122        60
OIR    2025250     91400   19.6300 -113.1300       7.8       172       121        60
OIR    2025250     91400   19.6300 -113.1400       7.8       172       122        60
OIR    2025250     91400   19.6300 -113.1500       7.8       172       123        60
OIR    2025250     91400   19.6300 -113.1600       7.8       172       122        60
OIR    2025250     91400   19.6300 -113.1700       7.8       172       119        60
OIR    2025250     91400   19.6300 -113.1800       7.7       172       116        60
OIR    2025250     91400   19.6300 -113.1900       7.7       172       117        60
OIR    2025250     91400   19.6300 -113.2000       7.7       172       119        60
OIR    2025250     91400   19.6300 -113.2100       7.7       172       119        60
OIR    2025250     91400   19.6300 -113.2200       7.7       172       116        60
OIR    2025250     91400   19.6300 -113.2300       7.7       172       115        60
OIR    2025250     91400   19.6300 -113.2400       7.7       172       112        60
OIR    2025250     91400   19.6300 -113.2500       7.7       172       110        60
OIR    2025250     91400   19.6300 -113.2600       7.8       172       109        60
OIR    2025250     91400   19.6300 -113.2700       7.8       172       108        60
OIR    2025250     91400   19.6300 -113.2800       7.8       172       108        60
OIR    2025250     91400   19.6300 -113.2900       7.8       172       109        60
OIR    2025250     91400   19.6300 -113.3000       7.8       172       108        60
OIR    2025250     91400   19.6300 -113.3100       7.9       172       105        60
OIR    2025250     91400   19.6300 -113.3200       7.9       172       104        60
OIR    2025250     91400   19.6300 -113.3300       7.9       172       104        60
OIR    2025250     91400   19.6300 -113.3400       7.9       172       103        60
OIR    2025250     91400   19.6300 -113.3500       8.0       172       103        60
OIR    2025250     91400   19.6300 -113.3600       8.0       172       104        60
OIR    2025250     91400   19.6300 -113.3700       8.0       172       103        60
OIR    2025250     91400   19.6300 -113.3800       8.0       172       103        60
OIR    2025250     91400   19.6300 -113.3900       8.1       172       103        60
OIR    2025250     91400   19.6300 -113.4000       8.1       172       103        60
OIR    2025250     91400   19.6300 -113.4100       8.1       172       103        60
OIR    2025250     91400   19.6300 -113.4200       8.1       172       103        60
OIR    2025250     91400   19.6300 -113.4300       8.1       172       103        60
OIR    2025250     91400   19.6300 -113.4400       8.2       172       103        60
OIR    2025250     91400   19.6300 -113.4500       8.2       172       103        60
OIR    2025250     91400   19.6300 -113.4600       8.2       172       103        60
OIR    2025250     91400   19.6300 -113.4700       8.3       172       103        60
OIR    2025250     91400   19.6300 -113.4800       8.3       172       103        60
OIR    2025250     91400   19.6300 -113.4900       8.3       172       103        60
OIR    2025250     91400   19.6300 -113.5000       8.4       172       103        60
OIR    2025250     91400   19.6300 -113.5100       8.4       172       103        60
OIR    2025250     91400   19.6300 -113.5200       8.4       172       103        60
OIR    2025250     91400   19.6300 -113.5300       8.5       172       103        60
OIR    2025250     91400   19.6300 -113.5400       8.5       173       103        60
OIR    2025250     91400   19.6300 -113.5500       8.5       173       103        60
OIR    2025250     91400   19.6300 -113.5600       8.5       173       103        60
OIR    2025250     91400   19.6300 -113.5700       8.5       173       103        60
OIR    2025250     91400   19.6300 -113.5800       8.6       174       103        60
OIR    2025250     91400   19.6300 -113.5900       8.6       174       103        60
OIR    2025250     91400   19.6300 -113.6000       8.6       174       103        60
OIR    2025250     91400   19.6300 -113.6100       8.7       175       103        60
OIR    2025250     91400   19.6300 -113.6200       8.7       175       103        60
OIR    2025250     91400   19.6300 -113.6300       8.7       175       103        60
OIR    2025250     91400   19.6300 -113.6400       8.7       175       103        60
OIR    2025250     91400   19.6300 -113.6500       8.7       175       103        60
OIR    2025250     91400   19.6300 -113.6600       8.8       175       103        60
OIR    2025250     91400   19.6300 -113.6700       8.8       176       103        60
OIR    2025250     91400   19.6300 -113.6800       8.8       176       103        60
OIR    2025250     91400   19.6300 -113.6900       8.8       176       103        60
OIR    2025250     91400   19.6300 -113.7000       8.8       176       103        60
OIR    2025250     91400   19.6300 -113.7100       8.8       176       103        60
OIR    2025250     91400   19.6300 -113.7200       8.8       176       104        60
OIR    2025250     91400   19.6300 -113.7300       8.8       176       104        60
OIR    2025250     91400   19.6300 -113.7400       8.9       176       104        60
OIR    2025250     91400   19.6300 -113.7500       8.9       176       104        60
OIR    2025250     91400   19.6300 -113.7600       8.9       177       104        60
OIR    2025250     91400   19.6300 -113.7700       8.9       177       104        60
OIR    2025250     91400   19.6300 -113.7800       8.9       177       105        60
OIR    2025250     91400   19.6300 -113.7900       9.0       177       107        60
OIR    2025250     91400   19.6300 -113.8000       9.0       177       108        60
OIR    2025250     91400   19.6300 -113.8100       9.0       177       108        60
OIR    2025250     91400   19.6300 -113.8200       9.0       177       108        60
OIR    2025250     91400   19.6300 -113.8300       9.0       177       108        60
OIR    2025250     91400   19.6300 -113.8400       9.0       178       108        60
OIR    2025250     91400   19.6300 -113.8500       9.1       178       108        60
OIR    2025250     91400   19.6300 -113.8600       9.1       178       108        60
OIR    2025250     91400   19.6300 -113.8700       9.1       179       108        60
OIR    2025250     91400   19.6300 -113.8800       9.1       179       107        60
OIR    2025250     91400   19.6300 -113.8900       9.1       179       105        60
OIR    2025250     91400   19.6300 -113.9000       9.1       179       104        60
OIR    2025250     91400   19.6300 -113.9100       9.1       179       104        60
OIR    2025250     91400   19.6300 -113.9200       9.1       179       104        60
OIR    2025250     91400   19.6300 -113.9300       9.1       179       104        60
OIR    2025250     91400   19.6300 -113.9400       9.1       179       104        60
OIR    2025250     91400   19.6300 -113.9500       9.1       179       104        60
OIR    2025250     91400   19.6300 -113.9600       9.1       179       105        60
OIR    2025250     91400   19.6300 -113.9700       9.1       179       105        60
OIR    2025250     91400   19.6300 -113.9800       9.1       180       105        60
OIR    2025250     91400   19.6300 -113.9900       9.1       180       104        60
OIR    2025250     91400   19.6300 -114.0000       9.1       180       104        60
OIR    2025250     91400   19.6300 -114.0100       9.0       180       104        60
OIR    2025250     91400   19.6300 -114.0200       9.0       180       105        60
OIR    2025250     91400   19.6300 -114.0300       9.0       181       107        60
OIR    2025250     91400   19.6300 -114.0400       8.9       182       107        60
OIR    2025250     91400   19.6300 -114.0500       8.9       182       107        60
OIR    2025250     91400   19.6300 -114.0600       8.8       183       107        60
OIR    2025250     91400   19.6300 -114.0700       8.8       184       105        60
OIR    2025250     91400   19.6300 -114.0800       8.8       184       105        60
OIR    2025250     91400   19.6300 -114.0900       8.8       185       105        60
OIR    2025250     91400   19.6300 -114.1000       8.7       185       107        60
OIR    2025250     91400   19.6300 -114.1100       8.7       186       107        60
OIR    2025250     91400   19.6300 -114.1200       8.7       187       107        60
OIR    2025250     91400   19.6300 -114.1300       8.7       187       107        60
OIR    2025250     91400   19.6300 -114.1400       8.6       188       107        60
OIR    2025250     91400   19.6300 -114.1500       8.6       189       107        60
OIR    2025250     91400   19.6300 -114.1600       8.6       189       108        60
OIR    2025250     91400   19.6300 -114.1700       8.5       190       108        60
OIR    2025250     91400   19.6300 -114.1800       8.5       192       108        60
OIR    2025250     91400   19.6300 -114.1900       8.5       194       109        60
OIR    2025250     91400   19.6300 -114.2000       8.5       196       109        60
OIR    2025250     91400   19.6300 -114.2100       8.5       196       109        60
OIR    2025250     91400   19.6300 -114.2200       8.5       197       110        60
OIR    2025250     91400   19.6300 -114.2300       8.5       197       110        60
OIR    2025250     91400   19.6300 -114.2400       8.4       198       110        60
OIR    2025250     91400   19.6300 -114.2500       8.4       198       109        60
OIR    2025250     91400   19.6300 -114.2600       8.4       200       109        60
OIR    2025250     91400   19.6300 -114.2700       8.4       201       111        60
OIR    2025250     91400   19.6300 -114.2800       8.3       203       112        60
OIR    2025250     91400   19.6300 -114.2900       8.3       206       113        60
OIR    2025250     91400   19.6300 -114.3000       8.3       213       114        60
OIR    2025250     91400   19.6300 -114.3100       8.5       218       114        60
OIR    2025250     91400   19.6300 -114.3200       8.5       219       114        60
OIR    2025250     91400   19.6300 -114.3300       8.5       219       114        60
OIR    2025250     91400   19.6300 -114.3400       8.5       219       114        60
OIR    2025250     91400   19.6300 -114.3500       8.5       219       114        60
OIR    2025250     91400   19.6300 -114.3600       8.5       219       114        60
OIR    2025250     91400   19.6300 -114.3700       8.5       219       114        60
OIR    2025250     91400   19.6300 -114.3800       8.5       219       114        60
OIR    2025250     91400   19.6300 -114.3900       8.5       219       114        60
OIR    2025250     91400   19.6300 -114.4000       8.5       219       114        60
OIR    2025250     91400   19.6300 -114.4100       8.5       219       114        60
OIR    2025250     91400   19.6300 -114.4200       8.5       219       115        60
OIR    2025250     91400   19.6300 -114.4300       8.5       219       119        60
OIR    2025250     91400   19.6300 -114.4400       8.5       219       124        60
OIR    2025250     91400   19.6300 -114.4500       8.5       219       127        60
OIR    2025250     91400   19.6300 -114.4600       8.5       219       129        60
OIR    2025250     91400   19.6300 -114.4700       8.5       219       128        60
OIR    2025250     91400   19.6300 -114.4800       8.5       219       126        60
OIR    2025250     91400   19.6300 -114.4900       8.5       219       126        60
OIR    2025250     91400   19.6300 -114.5000       8.5       218       127        60
OIR    2025250     91400   19.6300 -114.5100       8.4       217       127        60
OIR    2025250     91400   19.6300 -114.5200       8.0       213       127        60
OIR    2025250     91400   19.6300 -114.5300       7.0       198       126        60
OIR    2025250     91400   19.6300 -114.5400       6.5       182       127        60
OIR    2025250     91400   19.6300 -114.5500       6.5       176       128        60
OIR    2025250     91400   19.6300 -114.5600       6.5       173       128        60
OIR    2025250     91400   19.6300 -114.5700       6.4       172       128        60
OIR    2025250     91400   19.6300 -114.5800       6.4       172       128        60
OIR    2025250     91400   19.6300 -114.5900       6.4       171       128        60
OIR    2025250     91400   19.6300 -114.6000       6.4       171       128        60
OIR    2025250     91400   19.6300 -114.6100       6.5       170       129        60
OIR    2025250     91400   19.6300 -114.6200       6.5       170       131        60
OIR    2025250     91400   19.6300 -114.6300       6.5       170       132        60
OIR    2025250     91400   19.6300 -114.6400       6.5       170       134        60
OIR    2025250     91400   19.6300 -114.6500       6.5       170       135        60
OIR    2025250     91400   19.6300 -114.6600       6.5       170       137        60
OIR    2025250     91400   19.6300 -114.6700       6.5       170       138        60
OIR    2025250     91400   19.6300 -114.6800       6.5       170       140        60
OIR    2025250     91400   19.6300 -115.8600       8.1       188       140        60
OIR    2025250     91400   19.6300 -115.8700       8.8       186       138        60
OIR    2025250     91400   19.6300 -115.8800       9.2       184       136        60
OIR    2025250     91400   19.6300 -115.8900       9.4       183       135        60
OIR    2025250     91400   19.6300 -115.9000       9.6       181       133        60
OIR    2025250     91400   19.6300 -115.9100       9.7       180       132        60
OIR    2025250     91400   19.6300 -115.9200       9.8       179       132        60
OIR    2025250     91400   19.6300 -115.9300       9.9       179       132        60
OIR    2025250     91400   19.6300 -115.9400      10.0       178       132        60
OIR    2025250     91400   19.6300 -115.9500      10.1       178       132        60
OIR    2025250     91400   19.6300 -115.9600      10.3       177       132        60
OIR    2025250     91400   19.6300 -115.9700      10.4       177       132        60
OIR    2025250     91400   19.6300 -115.9800      10.4       177       133        60
OIR    2025250     91400   19.6300 -115.9900      10.5       177       135        60
OIR    2025250     91400   19.6300 -116.0000      10.5       177       137        60
OIR    2025250     91400   19.6300 -116.0100      10.6       177       137        60
OIR    2025250     91400   19.6300 -116.0200      10.6       177       138        60
OIR    2025250     91400   19.6300 -116.0300      10.7       177       142        60
OIR    2025250     91400   19.6300 -116.0600      10.8       177       142        60
OIR    2025250     91400   19.6300 -116.2900      11.1       179       139        60
OIR    2025250     91400   19.6300 -116.3000      11.6       184       135        60
OIR    2025250     91400   19.6300 -116.3100      12.6       191       133        60
OIR    2025250     91400   19.6300 -116.3200      13.5       195       138        60
OIR    2025250     91400   19.6300 -117.7200       7.0        15       143        60
OIR    2025250     91400   19.6300 -117.7300       7.2        14       143        60
OIR    2025250     91400   19.6300 -117.7400       7.3        13       142        60
OIR    2025250     91400   19.6300 -117.7500       7.6         9       142        60
OIR    2025250     91400   19.6300 -117.7600       7.8         7       142        60
OIR    2025250     91400   19.6300 -117.8800       7.4        17       141        60
OIR    2025250     91400   19.6300 -117.8900       7.0        22       139        60
OIR    2025250     91400   19.6300 -117.9000       6.8        28       138        60
OIR    2025250     91400   19.6300 -117.9100       6.7        32       138        60
OIR    2025250     91400   19.6300 -117.9200       6.7        33       137        60
OIR    2025250     91400   19.6300 -117.9300       6.7        34       137        60
OIR    2025250     91400   19.6300 -117.9400       6.7        36       136        60
OIR    2025250     91400   19.6300 -117.9500       6.6        37       135        60
OIR    2025250     91400   19.6300 -117.9600       6.6        39       134        60
OIR    2025250     91400   19.6300 -117.9700       6.6        42       134        60
OIR    2025250     91400   19.6300 -117.9800       6.5        44       133        60
OIR    2025250     91400   19.6300 -117.9900       6.6        47       133        60
OIR    2025250     91400   19.6300 -118.0000       6.6        52       133        60
OIR    2025250     91400   19.6300 -118.0100       6.7        59       133        60
OIR    2025250     91400   19.6300 -118.0200       6.8        63       133        60
OIR    2025250     91400   19.6300 -118.0300       7.0        65       134        60
OIR    2025250     91400   19.6300 -118.0400       7.1        67       134        60
OIR    2025250     91400   19.6300 -118.0500       7.1        68       135        60
OIR    2025250     91400   19.6300 -118.0600       7.2        69       135        60
OIR    2025250     91400   19.6300 -118.0700       7.2        70       136        60
OIR    2025250     91400   19.6300 -118.0800       7.3        70       138        60
OIR    2025250     91400   19.6300 -118.0900       7.4        71       139        60
OIR    2025250     91400   19.6300 -118.1000       7.5        72       141        60
OIR    2025250     91400   19.6200 -112.2700       8.1       100       138        60
OIR    2025250     91400   19.6200 -112.2800       8.3       101       136        60
OIR    2025250     91400   19.6200 -112.2900       8.4       103       134        60
OIR    2025250     91400   19.6200 -112.3000       7.3       104       138        60
OIR    2025250     91400   19.6200 -112.8700       7.8       172       139        60
OIR    2025250     91400   19.6200 -112.8800       7.8       172       137        60
OIR    2025250     91400   19.6200 -112.8900       7.8       172       138        60
OIR    2025250     91400   19.6200 -112.9000       7.8       172       139        60
OIR    2025250     91400   19.6200 -112.9100       7.8       172       138        60
OIR    2025250     91400   19.6200 -112.9200       7.8       172       137        60
OIR    2025250     91400   19.6200 -112.9300       7.8       172       137        60
OIR    2025250     91400   19.6200 -112.9400       7.8       172       137        60
OIR    2025250     91400   19.6200 -112.9500       7.8       172       136        60
OIR    2025250     91400   19.6200 -112.9600       7.8       172       135        60
OIR    2025250     91400   19.6200 -112.9700       7.8       172       133        60
OIR    2025250     91400   19.6200 -112.9800       7.8       172       132        60
OIR    2025250     91400   19.6200 -112.9900       7.8       172       131        60
OIR    2025250     91400   19.6200 -113.0000       7.8       172       131        60
OIR    2025250     91400   19.6200 -113.0100       7.8       172       130        60
OIR    2025250     91400   19.6200 -113.0200       7.8       172       130        60
OIR    2025250     91400   19.6200 -113.0300       7.8       172       130        60
OIR    2025250     91400   19.6200 -113.0400       7.8       172       130        60
OIR    2025250     91400   19.6200 -113.0500       7.8       172       127        60
OIR    2025250     91400   19.6200 -113.0600       7.8       172       124        60
OIR    2025250     91400   19.6200 -113.0700       7.8       172       122        60
OIR    2025250     91400   19.6200 -113.0800       7.8       172       121        60
OIR    2025250     91400   19.6200 -113.0900       7.8       172       120        60
OIR    2025250     91400   19.6200 -113.1000       7.8       172       120        60
OIR    2025250     91400   19.6200 -113.1100       7.8       172       119        60
OIR    2025250     91400   19.6200 -113.1200       7.8       172       119        60
OIR    2025250     91400   19.6200 -113.1300       7.8       172       117        60
OIR    2025250     91400   19.6200 -113.1400       7.8       172       119        60
OIR    2025250     91400   19.6200 -113.1500       7.8       172       122        60
OIR    2025250     91400   19.6200 -113.1600       7.7       172       122        60
OIR    2025250     91400   19.6200 -113.1700       7.7       172       119        60
OIR    2025250     91400   19.6200 -113.1800       7.7       172       116        60
OIR    2025250     91400   19.6200 -113.1900       7.7       172       116        60
OIR    2025250     91400   19.6200 -113.2000       7.7       172       116        60
OIR    2025250     91400   19.6200 -113.2100       7.7       172       116        60
OIR    2025250     91400   19.6200 -113.2200       7.7       172       115        60
OIR    2025250     91400   19.6200 -113.2300       7.7       172       114        60
OIR    2025250     91400   19.6200 -113.2400       7.7       172       114        60
OIR    2025250     91400   19.6200 -113.2500       7.7       172       113        60
OIR    2025250     91400   19.6200 -113.2600       7.7       172       110        60
OIR    2025250     91400   19.6200 -113.2700       7.8       172       108        60
OIR    2025250     91400   19.6200 -113.2800       7.8       172       107        60
OIR    2025250     91400   19.6200 -113.2900       7.8       172       107        60
OIR    2025250     91400   19.6200 -113.3000       7.8       172       105        60
OIR    2025250     91400   19.6200 -113.3100       7.9       172       104        60
OIR    2025250     91400   19.6200 -113.3200       7.9       172       104        60
OIR    2025250     91400   19.6200 -113.3300       7.9       172       104        60
OIR    2025250     91400   19.6200 -113.3400       7.9       172       103        60
OIR    2025250     91400   19.6200 -113.3500       8.0       172       103        60
OIR    2025250     91400   19.6200 -113.3600       8.0       172       103        60
OIR    2025250     91400   19.6200 -113.3700       8.0       172       103        60
OIR    2025250     91400   19.6200 -113.3800       8.0       172       103        60
OIR    2025250     91400   19.6200 -113.3900       8.1       172       103        60
OIR    2025250     91400   19.6200 -113.4000       8.1       172       103        60
OIR    2025250     91400   19.6200 -113.4100       8.1       172       103        60
OIR    2025250     91400   19.6200 -113.4200       8.1       172       103        60
OIR    2025250     91400   19.6200 -113.4300       8.2       172       103        60
OIR    2025250     91400   19.6200 -113.4400       8.2       172       103        60
OIR    2025250     91400   19.6200 -113.4500       8.2       172       103        60
OIR    2025250     91400   19.6200 -113.4600       8.2       172       103        60
OIR    2025250     91400   19.6200 -113.4700       8.3       172       103        60
OIR    2025250     91400   19.6200 -113.4800       8.3       172       103        60
OIR    2025250     91400   19.6200 -113.4900       8.3       172       103        60
OIR    2025250     91400   19.6200 -113.5000       8.4       172       103        60
OIR    2025250     91400   19.6200 -113.5100       8.4       173       103        60
OIR    2025250     91400   19.6200 -113.5200       8.4       173       103        60
OIR    2025250     91400   19.6200 -113.5300       8.5       173       103        60
OIR    2025250     91400   19.6200 -113.5400       8.5       173       103        60
OIR    2025250     91400   19.6200 -113.5500       8.5       173       103        60
OIR    2025250     91400   19.6200 -113.5600       8.5       173       103        60
OIR    2025250     91400   19.6200 -113.5700       8.6       174       103        60
OIR    2025250     91400   19.6200 -113.5800       8.6       174       103        60
OIR    2025250     91400   19.6200 -113.5900       8.6       174       103        60
OIR    2025250     91400   19.6200 -113.6000       8.7       175       103        60
OIR    2025250     91400   19.6200 -113.6100       8.7       175       103        60
OIR    2025250     91400   19.6200 -113.6200       8.7       175       103        60
OIR    2025250     91400   19.6200 -113.6300       8.7       175       103        60
OIR    2025250     91400   19.6200 -113.6400       8.7       175       103        60
OIR    2025250     91400   19.6200 -113.6500       8.8       175       103        60
OIR    2025250     91400   19.6200 -113.6600       8.8       176       103        60
OIR    2025250     91400   19.6200 -113.6700       8.8       176       103        60
OIR    2025250     91400   19.6200 -113.6800       8.8       176       103        60
OIR    2025250     91400   19.6200 -113.6900       8.8       176       103        60
OIR    2025250     91400   19.6200 -113.7000       8.8       176       103        60
OIR    2025250     91400   19.6200 -113.7100       8.8       176       104        60
OIR    2025250     91400   19.6200 -113.7200       8.8       176       104        60
OIR    2025250     91400   19.6200 -113.7300       8.9       176       104        60
OIR    2025250     91400   19.6200 -113.7400       8.9       176       104        60
OIR    2025250     91400   19.6200 -113.7500       8.9       177       104        60
OIR    2025250     91400   19.6200 -113.7600       8.9       177       104        60
OIR    2025250     91400   19.6200 -113.7700       8.9       177       105        60
OIR    2025250     91400   19.6200 -113.7800       9.0       177       105        60
OIR    2025250     91400   19.6200 -113.7900       9.0       177       107        60
OIR    2025250     91400   19.6200 -113.8000       9.0       177       108        60
OIR    2025250     91400   19.6200 -113.8100       9.0       177       108        60
OIR    2025250     91400   19.6200 -113.8200       9.0       177       109        60
OIR    2025250     91400   19.6200 -113.8300       9.0       178       109        60
OIR    2025250     91400   19.6200 -113.8400       9.0       178       108        60
OIR    2025250     91400   19.6200 -113.8500       9.1       178       108        60
OIR    2025250     91400   19.6200 -113.8600       9.1       179       107        60
OIR    2025250     91400   19.6200 -113.8700       9.1       179       107        60
OIR    2025250     91400   19.6200 -113.8800       9.1       179       107        60
OIR    2025250     91400   19.6200 -113.8900       9.1       179       105        60
OIR    2025250     91400   19.6200 -113.9000       9.1       179       104        60
OIR    2025250     91400   19.6200 -113.9100       9.1       179       104        60
OIR    2025250     91400   19.6200 -113.9200       9.1       179       104        60
OIR    2025250     91400   19.6200 -113.9300       9.1       179       104        60
OIR    2025250     91400   19.6200 -113.9400       9.1       179       104        60
OIR    2025250     91400   19.6200 -113.9500       9.1       179       104        60
OIR    2025250     91400   19.6200 -113.9600       9.1       179       104        60
OIR    2025250     91400   19.6200 -113.9700       9.1       180       104        60
OIR    2025250     91400   19.6200 -113.9800       9.1       180       104        60
OIR    2025250     91400   19.6200 -113.9900       9.1       180       104        60
OIR    2025250     91400   19.6200 -114.0000       9.1       180       104        60
OIR    2025250     91400   19.6200 -114.0100       9.0       180       104        60
OIR    2025250     91400   19.6200 -114.0200       9.0       181       105        60
OIR    2025250     91400   19.6200 -114.0300       9.0       181       107        60
OIR    2025250     91400   19.6200 -114.0400       9.0       182       107        60
OIR    2025250     91400   19.6200 -114.0500       8.9       182       105        60
OIR    2025250     91400   19.6200 -114.0600       8.9       183       105        60
OIR    2025250     91400   19.6200 -114.0700       8.8       184       105        60
OIR    2025250     91400   19.6200 -114.0800       8.8       184       105        60
OIR    2025250     91400   19.6200 -114.0900       8.8       185       105        60
OIR    2025250     91400   19.6200 -114.1000       8.8       185       105        60
OIR    2025250     91400   19.6200 -114.1100       8.7       186       105        60
OIR    2025250     91400   19.6200 -114.1200       8.7       186       107        60
OIR    2025250     91400   19.6200 -114.1300       8.7       187       107        60
OIR    2025250     91400   19.6200 -114.1400       8.6       188       105        60
OIR    2025250     91400   19.6200 -114.1500       8.6       188       105        60
OIR    2025250     91400   19.6200 -114.1600       8.6       189       107        60
OIR    2025250     91400   19.6200 -114.1700       8.5       190       107        60
OIR    2025250     91400   19.6200 -114.1800       8.5       191       108        60
OIR    2025250     91400   19.6200 -114.1900       8.4       193       108        60
OIR    2025250     91400   19.6200 -114.2000       8.4       195       109        60
OIR    2025250     91400   19.6200 -114.2100       8.4       196       109        60
OIR    2025250     91400   19.6200 -114.2200       8.4       197       110        60
OIR    2025250     91400   19.6200 -114.2300       8.4       197       110        60
OIR    2025250     91400   19.6200 -114.2400       8.4       198       110        60
OIR    2025250     91400   19.6200 -114.2500       8.4       199       109        60
OIR    2025250     91400   19.6200 -114.2600       8.4       200       107        60
OIR    2025250     91400   19.6200 -114.2700       8.3       201       109        60
OIR    2025250     91400   19.6200 -114.2800       8.3       203       112        60
OIR    2025250     91400   19.6200 -114.2900       8.3       206       113        60
OIR    2025250     91400   19.6200 -114.3000       8.3       213       114        60
OIR    2025250     91400   19.6200 -114.3100       8.5       218       114        60
OIR    2025250     91400   19.6200 -114.3200       8.5       218       113        60
OIR    2025250     91400   19.6200 -114.3300       8.5       219       112        60
OIR    2025250     91400   19.6200 -114.3400       8.5       219       113        60
OIR    2025250     91400   19.6200 -114.3500       8.5       219       114        60
OIR    2025250     91400   19.6200 -114.3600       8.5       219       114        60
OIR    2025250     91400   19.6200 -114.3700       8.5       219       114        60
OIR    2025250     91400   19.6200 -114.3800       8.5       219       113        60
OIR    2025250     91400   19.6200 -114.3900       8.5       219       113        60
OIR    2025250     91400   19.6200 -114.4000       8.5       219       113        60
OIR    2025250     91400   19.6200 -114.4100       8.5       219       113        60
OIR    2025250     91400   19.6200 -114.4200       8.5       219       113        60
OIR    2025250     91400   19.6200 -114.4300       8.5       219       117        60
OIR    2025250     91400   19.6200 -114.4400       8.5       219       123        60
OIR    2025250     91400   19.6200 -114.4500       8.5       219       127        60
OIR    2025250     91400   19.6200 -114.4600       8.5       219       130        60
OIR    2025250     91400   19.6200 -114.4700       8.5       219       130        60
OIR    2025250     91400   19.6200 -114.4800       8.5       219       128        60
OIR    2025250     91400   19.6200 -114.4900       8.5       219       128        60
OIR    2025250     91400   19.6200 -114.5000       8.4       219       128        60
OIR    2025250     91400   19.6200 -114.5100       8.4       218       128        60
OIR    2025250     91400   19.6200 -114.5200       8.0       214       127        60
OIR    2025250     91400   19.6200 -114.5300       6.9       201       127        60
OIR    2025250     91400   19.6200 -114.5400       6.4       183       127        60
OIR    2025250     91400   19.6200 -114.5500       6.4       176       129        60
OIR    2025250     91400   19.6200 -114.5600       6.5       173       129        60
OIR    2025250     91400   19.6200 -114.5700       6.5       172       129        60
OIR    2025250     91400   19.6200 -114.5800       6.5       172       128        60
OIR    2025250     91400   19.6200 -114.5900       6.5       171       129        60
OIR    2025250     91400   19.6200 -114.6000       6.5       171       129        60
OIR    2025250     91400   19.6200 -114.6100       6.5       170       130        60
OIR    2025250     91400   19.6200 -114.6200       6.5       170       131        60
OIR    2025250     91400   19.6200 -114.6300       6.5       170       132        60
OIR    2025250     91400   19.6200 -114.6400       6.5       170       134        60
OIR    2025250     91400   19.6200 -114.6500       6.5       170       135        60
OIR    2025250     91400   19.6200 -114.6600       6.5       170       136        60
OIR    2025250     91400   19.6200 -114.6700       6.5       170       137        60
OIR    2025250     91400   19.6200 -114.6800       6.5       170       138        60
OIR    2025250     91400   19.6200 -114.6900       6.5       170       140        60
OIR    2025250     91400   19.6200 -115.8400       7.6       192       143        60
OIR    2025250     91400   19.6200 -115.8500       8.4       190       140        60
OIR    2025250     91400   19.6200 -115.8600       8.9       188       138        60
OIR    2025250     91400   19.6200 -115.8700       9.3       187       137        60
OIR    2025250     91400   19.6200 -115.8800       9.6       185       136        60
OIR    2025250     91400   19.6200 -115.8900       9.7       184       135        60
OIR    2025250     91400   19.6200 -115.9000       9.8       183       134        60
OIR    2025250     91400   19.6200 -115.9100       9.9       181       134        60
OIR    2025250     91400   19.6200 -115.9200       9.9       180       134        60
OIR    2025250     91400   19.6200 -115.9300      10.0       179       133        60
OIR    2025250     91400   19.6200 -115.9400      10.1       178       134        60
OIR    2025250     91400   19.6200 -115.9500      10.3       178       135        60
OIR    2025250     91400   19.6200 -115.9600      10.4       178       135        60
OIR    2025250     91400   19.6200 -115.9700      10.4       178       135        60
OIR    2025250     91400   19.6200 -115.9800      10.5       178       135        60
OIR    2025250     91400   19.6200 -115.9900      10.5       177       137        60
OIR    2025250     91400   19.6200 -116.0000      10.5       177       138        60
OIR    2025250     91400   19.6200 -116.0100      10.6       177       139        60
OIR    2025250     91400   19.6200 -116.0200      10.6       177       141        60
OIR    2025250     91400   19.6200 -116.0300      10.6       177       142        60
OIR    2025250     91400   19.6200 -116.2800      10.3       177       142        60
OIR    2025250     91400   19.6200 -116.2900      10.4       178       138        60
OIR    2025250     91400   19.6200 -116.3000      10.1       182       135        60
OIR    2025250     91400   19.6200 -116.3100      10.0       187       132        60
OIR    2025250     91400   19.6200 -116.3200       9.8       192       135        60
OIR    2025250     91400   19.6200 -116.3300       9.6       197       138        60
OIR    2025250     91400   19.6200 -116.3400      10.8       200       140        60
OIR    2025250     91400   19.6200 -116.3500      11.9       200       141        60
OIR    2025250     91400   19.6200 -117.7200       7.4        15       144        60
OIR    2025250     91400   19.6200 -117.7300       7.5        14       144        60
OIR    2025250     91400   19.6200 -117.8700       7.5        21       141        60
OIR    2025250     91400   19.6200 -117.8800       7.6        26       139        60
OIR    2025250     91400   19.6200 -117.8900       7.2        32       137        60
OIR    2025250     91400   19.6200 -117.9000       6.9        36       136        60
OIR    2025250     91400   19.6200 -117.9100       6.8        38       136        60
OIR    2025250     91400   19.6200 -117.9200       6.7        38       136        60
OIR    2025250     91400   19.6200 -117.9300       6.7        39       135        60
OIR    2025250     91400   19.6200 -117.9400       6.7        40       135        60
OIR    2025250     91400   19.6200 -117.9500       6.7        41       134        60
OIR    2025250     91400   19.6200 -117.9600       6.7        42       133        60
OIR    2025250     91400   19.6200 -117.9700       6.6        45       132        60
OIR    2025250     91400   19.6200 -117.9800       6.6        47       132        60
OIR    2025250     91400   19.6200 -117.9900       6.7        50       131        60
OIR    2025250     91400   19.6200 -118.0000       6.8        56       132        60
OIR    2025250     91400   19.6200 -118.0100       6.9        61       132        60
OIR    2025250     91400   19.6200 -118.0200       7.1        65       132        60
OIR    2025250     91400   19.6200 -118.0300       7.2        67       133        60
OIR    2025250     91400   19.6200 -118.0400       7.2        68       134        60
OIR    2025250     91400   19.6200 -118.0500       7.3        68       136        60
OIR    2025250     91400   19.6200 -118.0600       7.3        69       136        60
OIR    2025250     91400   19.6200 -118.0700       7.4        69       135        60
OIR    2025250     91400   19.6200 -118.0800       7.5        70       137        60
OIR    2025250     91400   19.6200 -118.0900       7.6        71       139        60
OIR    2025250     91400   19.6200 -118.1000       7.7        73       142        60
OIR    2025250     91400   19.6100 -112.2700       8.5       103       136        60
OIR    2025250     91400   19.6100 -112.2800       8.6       105       134        60
OIR    2025250     91400   19.6100 -112.2900       8.4       107       133        60
OIR    2025250     91400   19.6100 -112.3000       7.2       108       138        60
OIR    2025250     91400   19.6100 -112.8400       7.7       172       140        60
OIR    2025250     91400   19.6100 -112.8500       7.7       172       140        60
OIR    2025250     91400   19.6100 -112.8600       7.7       172       139        60
OIR    2025250     91400   19.6100 -112.8700       7.7       172       139        60
OIR    2025250     91400   19.6100 -112.8800       7.8       172       138        60
OIR    2025250     91400   19.6100 -112.8900       7.8       172       140        60
OIR    2025250     91400   19.6100 -112.9100       7.8       172       139        60
OIR    2025250     91400   19.6100 -112.9200       7.8       172       135        60
OIR    2025250     91400   19.6100 -112.9300       7.8       172       134        60
OIR    2025250     91400   19.6100 -112.9400       7.8       172       135        60
OIR    2025250     91400   19.6100 -112.9500       7.8       172       136        60
OIR    2025250     91400   19.6100 -112.9600       7.8       172       134        60
OIR    2025250     91400   19.6100 -112.9700       7.8       172       133        60
OIR    2025250     91400   19.6100 -112.9800       7.8       172       132        60
OIR    2025250     91400   19.6100 -112.9900       7.8       172       132        60
OIR    2025250     91400   19.6100 -113.0000       7.8       172       131        60
OIR    2025250     91400   19.6100 -113.0100       7.8       172       131        60
OIR    2025250     91400   19.6100 -113.0200       7.8       172       131        60
OIR    2025250     91400   19.6100 -113.0300       7.8       172       131        60
OIR    2025250     91400   19.6100 -113.0400       7.8       172       130        60
OIR    2025250     91400   19.6100 -113.0500       7.8       172       129        60
OIR    2025250     91400   19.6100 -113.0600       7.8       172       128        60
OIR    2025250     91400   19.6100 -113.0700       7.8       172       126        60
OIR    2025250     91400   19.6100 -113.0800       7.8       172       122        60
OIR    2025250     91400   19.6100 -113.0900       7.8       172       120        60
OIR    2025250     91400   19.6100 -113.1000       7.8       172       119        60
OIR    2025250     91400   19.6100 -113.1100       7.8       172       117        60
OIR    2025250     91400   19.6100 -113.1200       7.8       172       117        60
OIR    2025250     91400   19.6100 -113.1300       7.8       172       116        60
OIR    2025250     91400   19.6100 -113.1400       7.8       172       116        60
OIR    2025250     91400   19.6100 -113.1500       7.7       172       119        60
OIR    2025250     91400   19.6100 -113.1600       7.7       172       121        60
OIR    2025250     91400   19.6100 -113.1700       7.7       172       117        60
OIR    2025250     91400   19.6100 -113.1800       7.7       172       116        60
OIR    2025250     91400   19.6100 -113.1900       7.7       172       116        60
OIR    2025250     91400   19.6100 -113.2000       7.7       172       116        60
OIR    2025250     91400   19.6100 -113.2100       7.7       172       115        60
OIR    2025250     91400   19.6100 -113.2200       7.7       172       114        60
OIR    2025250     91400   19.6100 -113.2300       7.7       172       113        60
OIR    2025250     91400   19.6100 -113.2400       7.7       172       113        60
OIR    2025250     91400   19.6100 -113.2500       7.7       172       113        60
OIR    2025250     91400   19.6100 -113.2600       7.7       172       111        60
OIR    2025250     91400   19.6100 -113.2700       7.8       172       108        60
OIR    2025250     91400   19.6100 -113.2800       7.8       172       107        60
OIR    2025250     91400   19.6100 -113.2900       7.8       172       105        60
OIR    2025250     91400   19.6100 -113.3000       7.8       172       104        60
OIR    2025250     91400   19.6100 -113.3100       7.9       172       104        60
OIR    2025250     91400   19.6100 -113.3200       7.9       172       104        60
OIR    2025250     91400   19.6100 -113.3300       7.9       172       104        60
OIR    2025250     91400   19.6100 -113.3400       7.9       172       103        60
OIR    2025250     91400   19.6100 -113.3500       7.9       172       103        60
OIR    2025250     91400   19.6100 -113.3600       8.0       172       103        60
OIR    2025250     91400   19.6100 -113.3700       8.0       172       103        60
OIR    2025250     91400   19.6100 -113.3800       8.0       172       103        60
OIR    2025250     91400   19.6100 -113.3900       8.1       172       103        60
OIR    2025250     91400   19.6100 -113.4000       8.1       172       103        60
OIR    2025250     91400   19.6100 -113.4100       8.1       172       103        60
OIR    2025250     91400   19.6100 -113.4200       8.1       172       103        60
OIR    2025250     91400   19.6100 -113.4300       8.2       172       103        60
OIR    2025250     91400   19.6100 -113.4400       8.2       172       103        60
OIR    2025250     91400   19.6100 -113.4500       8.2       172       103        60
OIR    2025250     91400   19.6100 -113.4600       8.3       172       103        60
OIR    2025250     91400   19.6100 -113.4700       8.3       172       103        60
OIR    2025250     91400   19.6100 -113.4800       8.3       173       103        60
OIR    2025250     91400   19.6100 -113.4900       8.4       173       103        60
OIR    2025250     91400   19.6100 -113.5000       8.4       173       103        60
OIR    2025250     91400   19.6100 -113.5100       8.4       173       103        60
OIR    2025250     91400   19.6100 -113.5200       8.5       173       103        60
OIR    2025250     91400   19.6100 -113.5300       8.5       173       103        60
OIR    2025250     91400   19.6100 -113.5400       8.5       173       103        60
OIR    2025250     91400   19.6100 -113.5500       8.5       174       103        60
OIR    2025250     91400   19.6100 -113.5600       8.6       174       103        60
OIR    2025250     91400   19.6100 -113.5700       8.6       174       103        60
OIR    2025250     91400   19.6100 -113.5800       8.6       174       103        60
OIR    2025250     91400   19.6100 -113.5900       8.7       175       103        60
OIR    2025250     91400   19.6100 -113.6000       8.7       175       103        60
OIR    2025250     91400   19.6100 -113.6100       8.7       175       103        60
OIR    2025250     91400   19.6100 -113.6200       8.7       175       103        60
OIR    2025250     91400   19.6100 -113.6300       8.7       175       103        60
OIR    2025250     91400   19.6100 -113.6400       8.7       175       103        60
OIR    2025250     91400   19.6100 -113.6500       8.8       176       103        60
OIR    2025250     91400   19.6100 -113.6600       8.8       176       103        60
OIR    2025250     91400   19.6100 -113.6700       8.8       176       103        60
OIR    2025250     91400   19.6100 -113.6800       8.8       176       103        60
OIR    2025250     91400   19.6100 -113.6900       8.8       176       103        60
OIR    2025250     91400   19.6100 -113.7000       8.8       176       103        60
OIR    2025250     91400   19.6100 -113.7100       8.8       176       103        60
OIR    2025250     91400   19.6100 -113.7200       8.8       176       104        60
OIR    2025250     91400   19.6100 -113.7300       8.9       176       104        60
OIR    2025250     91400   19.6100 -113.7400       8.9       177       104        60
OIR    2025250     91400   19.6100 -113.7500       8.9       177       104        60
OIR    2025250     91400   19.6100 -113.7600       8.9       177       104        60
OIR    2025250     91400   19.6100 -113.7700       8.9       177       104        60
OIR    2025250     91400   19.6100 -113.7800       9.0       177       105        60
OIR    2025250     91400   19.6100 -113.7900       9.0       177       105        60
OIR    2025250     91400   19.6100 -113.8000       9.0       177       107        60
OIR    2025250     91400   19.6100 -113.8100       9.0       177       108        60
OIR    2025250     91400   19.6100 -113.8200       9.0       178       108        60
OIR    2025250     91400   19.6100 -113.8300       9.0       178       108        60
OIR    2025250     91400   19.6100 -113.8400       9.0       178       108        60
OIR    2025250     91400   19.6100 -113.8500       9.1       178       107        60
OIR    2025250     91400   19.6100 -113.8600       9.1       179       107        60
OIR    2025250     91400   19.6100 -113.8700       9.1       179       107        60
OIR    2025250     91400   19.6100 -113.8800       9.1       179       105        60
OIR    2025250     91400   19.6100 -113.8900       9.1       179       105        60
OIR    2025250     91400   19.6100 -113.9000       9.1       179       104        60
OIR    2025250     91400   19.6100 -113.9100       9.1       179       104        60
OIR    2025250     91400   19.6100 -113.9200       9.1       179       104        60
OIR    2025250     91400   19.6100 -113.9300       9.1       179       104        60
OIR    2025250     91400   19.6100 -113.9400       9.1       179       104        60
OIR    2025250     91400   19.6100 -113.9500       9.1       179       104        60
OIR    2025250     91400   19.6100 -113.9600       9.1       180       104        60
OIR    2025250     91400   19.6100 -113.9700       9.1       180       104        60
OIR    2025250     91400   19.6100 -113.9800       9.1       180       104        60
OIR    2025250     91400   19.6100 -113.9900       9.1       180       104        60
OIR    2025250     91400   19.6100 -114.0000       9.1       180       104        60
OIR    2025250     91400   19.6100 -114.0100       9.1       181       104        60
OIR    2025250     91400   19.6100 -114.0200       9.0       181       105        60
OIR    2025250     91400   19.6100 -114.0300       9.0       181       107        60
OIR    2025250     91400   19.6100 -114.0400       9.0       182       105        60
OIR    2025250     91400   19.6100 -114.0500       9.0       182       105        60
OIR    2025250     91400   19.6100 -114.0600       8.9       183       104        60
OIR    2025250     91400   19.6100 -114.0700       8.9       184       105        60
OIR    2025250     91400   19.6100 -114.0800       8.8       184       105        60
OIR    2025250     91400   19.6100 -114.0900       8.8       185       104        60
OIR    2025250     91400   19.6100 -114.1000       8.8       185       104        60
OIR    2025250     91400   19.6100 -114.1100       8.8       186       104        60
OIR    2025250     91400   19.6100 -114.1200       8.8       186       105        60
OIR    2025250     91400   19.6100 -114.1300       8.7       187       105        60
OIR    2025250     91400   19.6100 -114.1400       8.7       188       105        60
OIR    2025250     91400   19.6100 -114.1500       8.6       188       105        60
OIR    2025250     91400   19.6100 -114.1600       8.6       189       105        60
OIR    2025250     91400   19.6100 -114.1700       8.6       189       107        60
OIR    2025250     91400   19.6100 -114.1800       8.5       191       107        60
OIR    2025250     91400   19.6100 -114.1900       8.5       192       108        60
OIR    2025250     91400   19.6100 -114.2000       8.4       194       109        60
OIR    2025250     91400   19.6100 -114.2100       8.4       196       110        60
OIR    2025250     91400   19.6100 -114.2200       8.4       197       110        60
OIR    2025250     91400   19.6100 -114.2300       8.4       197       110        60
OIR    2025250     91400   19.6100 -114.2400       8.4       198       110        60
OIR    2025250     91400   19.6100 -114.2500       8.4       199       109        60
OIR    2025250     91400   19.6100 -114.2600       8.3       200       108        60
OIR    2025250     91400   19.6100 -114.2700       8.3       201       110        60
OIR    2025250     91400   19.6100 -114.2800       8.3       203       112        60
OIR    2025250     91400   19.6100 -114.2900       8.2       206       113        60
OIR    2025250     91400   19.6100 -114.3000       8.3       214       114        60
OIR    2025250     91400   19.6100 -114.3100       8.5       218       114        60
OIR    2025250     91400   19.6100 -114.3200       8.5       218       113        60
OIR    2025250     91400   19.6100 -114.3300       8.5       219       111        60
OIR    2025250     91400   19.6100 -114.3400       8.5       219       112        60
OIR    2025250     91400   19.6100 -114.3500       8.5       219       114        60
OIR    2025250     91400   19.6100 -114.3600       8.5       219       114        60
OIR    2025250     91400   19.6100 -114.3700       8.5       219       114        60
OIR    2025250     91400   19.6100 -114.3800       8.5       219       114        60
OIR    2025250     91400   19.6100 -114.3900       8.5       219       114        60
OIR    2025250     91400   19.6100 -114.4000       8.5       219       114        60
OIR    2025250     91400   19.6100 -114.4100       8.5       219       114        60
OIR    2025250     91400   19.6100 -114.4200       8.5       219       115        60
OIR    2025250     91400   19.6100 -114.4300       8.5       219       117        60
OIR    2025250     91400   19.6100 -114.4400       8.5       219       123        60
OIR    2025250     91400   19.6100 -114.4500       8.5       219       126        60
OIR    2025250     91400   19.6100 -114.4600       8.5       219       128        60
OIR    2025250     91400   19.6100 -114.4700       8.5       219       129        60
OIR    2025250     91400   19.6100 -114.4800       8.5       219       128        60
OIR    2025250     91400   19.6100 -114.4900       8.4       219       127        60
OIR    2025250     91400   19.6100 -114.5000       8.4       219       127        60
OIR    2025250     91400   19.6100 -114.5100       8.4       218       128        60
OIR    2025250     91400   19.6100 -114.5200       8.0       215       127        60
OIR    2025250     91400   19.6100 -114.5300       7.0       202       127        60
OIR    2025250     91400   19.6100 -114.5400       6.5       183       127        60
OIR    2025250     91400   19.6100 -114.5500       6.5       175       129        60
OIR    2025250     91400   19.6100 -114.5600       6.5       173       130        60
OIR    2025250     91400   19.6100 -114.5700       6.5       172       129        60
OIR    2025250     91400   19.6100 -114.5800       6.5       172       129        60
OIR    2025250     91400   19.6100 -114.5900       6.5       171       129        60
OIR    2025250     91400   19.6100 -114.6000       6.5       171       130        60
OIR    2025250     91400   19.6100 -114.6100       6.5       170       130        60
OIR    2025250     91400   19.6100 -114.6200       6.5       170       131        60
OIR    2025250     91400   19.6100 -114.6300       6.5       170       132        60
OIR    2025250     91400   19.6100 -114.6400       6.5       170       133        60
OIR    2025250     91400   19.6100 -114.6500       6.5       170       134        60
OIR    2025250     91400   19.6100 -114.6600       6.5       170       135        60
OIR    2025250     91400   19.6100 -114.6700       6.5       170       135        60
OIR    2025250     91400   19.6100 -114.6800       6.5       170       137        60
OIR    2025250     91400   19.6100 -114.6900       6.5       170       138        60
OIR    2025250     91400   19.6100 -114.7000       6.5       169       140        60
OIR    2025250     91400   19.6100 -115.8400       9.1       190       140        60
OIR    2025250     91400   19.6100 -115.8500       9.5       190       137        60
OIR    2025250     91400   19.6100 -115.8600       9.7       189       136        60
OIR    2025250     91400   19.6100 -115.8700       9.8       188       136        60
OIR    2025250     91400   19.6100 -115.8800       9.9       186       135        60
OIR    2025250     91400   19.6100 -115.8900      10.0       185       134        60
OIR    2025250     91400   19.6100 -115.9000      10.0       184       134        60
OIR    2025250     91400   19.6100 -115.9100      10.1       182       135        60
OIR    2025250     91400   19.6100 -115.9200      10.1       181       135        60
OIR    2025250     91400   19.6100 -115.9300      10.2       180       134        60
OIR    2025250     91400   19.6100 -115.9400      10.3       179       135        60
OIR    2025250     91400   19.6100 -115.9500      10.4       178       137        60
OIR    2025250     91400   19.6100 -115.9600      10.5       178       137        60
OIR    2025250     91400   19.6100 -115.9700      10.5       178       137        60
OIR    2025250     91400   19.6100 -115.9800      10.5       178       137        60
OIR    2025250     91400   19.6100 -115.9900      10.5       178       137        60
OIR    2025250     91400   19.6100 -116.0000      10.6       178       139        60
OIR    2025250     91400   19.6100 -116.0100      10.6       178       141        60
OIR    2025250     91400   19.6100 -116.0300      10.6       177       142        60
OIR    2025250     91400   19.6100 -116.0400      10.6       177       142        60
OIR    2025250     91400   19.6100 -116.0500      10.7       177       142        60
OIR    2025250     91400   19.6100 -116.2800       9.5       179       139        60
OIR    2025250     91400   19.6100 -116.2900       9.4       181       134        60
OIR    2025250     91400   19.6100 -116.3000       9.3       184       133        60
OIR    2025250     91400   19.6100 -116.3100       9.2       188       131        60
OIR    2025250     91400   19.6100 -116.3200       9.2       192       132        60
OIR    2025250     91400   19.6100 -116.3300       9.5       197       134        60
OIR    2025250     91400   19.6100 -116.3400       9.8       199       136        60
OIR    2025250     91400   19.6100 -116.3500      10.2       201       140        60
OIR    2025250     91400   19.6100 -117.8700       7.3        37       142        60
OIR    2025250     91400   19.6100 -117.8800       7.5        39       139        60
OIR    2025250     91400   19.6100 -117.8900       7.2        41       137        60
OIR    2025250     91400   19.6100 -117.9000       7.0        42       136        60
OIR    2025250     91400   19.6100 -117.9100       6.9        42       136        60
OIR    2025250     91400   19.6100 -117.9200       6.8        43       137        60
OIR    2025250     91400   19.6100 -117.9300       6.7        43       136        60
OIR    2025250     91400   19.6100 -117.9400       6.7        43       135        60
OIR    2025250     91400   19.6100 -117.9500       6.7        44       134        60
OIR    2025250     91400   19.6100 -117.9600       6.7        46       132        60
OIR    2025250     91400   19.6100 -117.9700       6.7        49       132        60
OIR    2025250     91400   19.6100 -117.9800       6.7        50       131        60
OIR    2025250     91400   19.6100 -117.9900       6.8        55       131        60
OIR    2025250     91400   19.6100 -118.0000       6.9        60       131        60
OIR    2025250     91400   19.6100 -118.0100       7.1        64       132        60
OIR    2025250     91400   19.6100 -118.0200       7.2        66       132        60
OIR    2025250     91400   19.6100 -118.0300       7.3        67       133        60
OIR    2025250     91400   19.6100 -118.0400       7.3        68       135        60
OIR    2025250     91400   19.6100 -118.0500       7.3        68       137        60
OIR    2025250     91400   19.6100 -118.0600       7.4        69       137        60
OIR    2025250     91400   19.6100 -118.0700       7.5        70       137        60
OIR    2025250     91400   19.6100 -118.0800       7.6        71       138        60
OIR    2025250     91400   19.6100 -118.0900       7.8        72       140        60
OIR    2025250     91400   19.6000 -112.2700       8.7       103       138        60
OIR    2025250     91400   19.6000 -112.2800       8.7       105       136        60
OIR    2025250     91400   19.6000 -112.2900       8.3       107       136        60
OIR    2025250     91400   19.6000 -112.3000       7.0       107       140        60
OIR    2025250     91400   19.6000 -112.8400       7.7       172       139        60
OIR    2025250     91400   19.6000 -112.8500       7.7       172       139        60
OIR    2025250     91400   19.6000 -112.8600       7.7       172       139        60
OIR    2025250     91400   19.6000 -112.8700       7.7       172       139        60
OIR    2025250     91400   19.6000 -112.8800       7.7       172       139        60
OIR    2025250     91400   19.6000 -112.8900       7.7       172       140        60
OIR    2025250     91400   19.6000 -112.9000       7.8       172       140        60
OIR    2025250     91400   19.6000 -112.9100       7.8       172       139        60
OIR    2025250     91400   19.6000 -112.9200       7.8       172       135        60
OIR    2025250     91400   19.6000 -112.9300       7.8       172       132        60
OIR    2025250     91400   19.6000 -112.9400       7.8       172       134        60
OIR    2025250     91400   19.6000 -112.9500       7.8       172       136        60
OIR    2025250     91400   19.6000 -112.9600       7.8       172       134        60
OIR    2025250     91400   19.6000 -112.9700       7.8       172       133        60
OIR    2025250     91400   19.6000 -112.9800       7.8       172       132        60
OIR    2025250     91400   19.6000 -112.9900       7.8       172       132        60
OIR    2025250     91400   19.6000 -113.0000       7.8       172       132        60
OIR    2025250     91400   19.6000 -113.0100       7.8       172       132        60
OIR    2025250     91400   19.6000 -113.0200       7.8       172       132        60
OIR    2025250     91400   19.6000 -113.0300       7.8       172       131        60
OIR    2025250     91400   19.6000 -113.0400       7.8       172       130        60
OIR    2025250     91400   19.6000 -113.0500       7.8       172       130        60
OIR    2025250     91400   19.6000 -113.0600       7.8       172       130        60
OIR    2025250     91400   19.6000 -113.0700       7.8       172       130        60
OIR    2025250     91400   19.6000 -113.0800       7.8       172       125        60
OIR    2025250     91400   19.6000 -113.0900       7.8       172       120        60
OIR    2025250     91400   19.6000 -113.1000       7.8       173       119        60
OIR    2025250     91400   19.6000 -113.1100       7.8       173       119        60
OIR    2025250     91400   19.6000 -113.1200       7.8       173       117        60
OIR    2025250     91400   19.6000 -113.1300       7.7       173       116        60
OIR    2025250     91400   19.6000 -113.1400       7.7       173       116        60
OIR    2025250     91400   19.6000 -113.1500       7.7       173       116        60
OIR    2025250     91400   19.6000 -113.1600       7.7       173       117        60
OIR    2025250     91400   19.6000 -113.1700       7.7       173       116        60
OIR    2025250     91400   19.6000 -113.1800       7.7       173       115        60
OIR    2025250     91400   19.6000 -113.1900       7.7       173       115        60
OIR    2025250     91400   19.6000 -113.2000       7.7       172       116        60
OIR    2025250     91400   19.6000 -113.2100       7.7       172       116        60
OIR    2025250     91400   19.6000 -113.2200       7.7       172       114        60
OIR    2025250     91400   19.6000 -113.2300       7.7       172       113        60
OIR    2025250     91400   19.6000 -113.2400       7.7       172       112        60
OIR    2025250     91400   19.6000 -113.2500       7.7       172       111        60
OIR    2025250     91400   19.6000 -113.2600       7.8       172       110        60
OIR    2025250     91400   19.6000 -113.2700       7.8       172       107        60
OIR    2025250     91400   19.6000 -113.2800       7.8       172       105        60
OIR    2025250     91400   19.6000 -113.2900       7.8       172       105        60
OIR    2025250     91400   19.6000 -113.3000       7.8       172       105        60
OIR    2025250     91400   19.6000 -113.3100       7.8       172       104        60
OIR    2025250     91400   19.6000 -113.3200       7.9       172       104        60
OIR    2025250     91400   19.6000 -113.3300       7.9       172       104        60
OIR    2025250     91400   19.6000 -113.3400       7.9       172       104        60
OIR    2025250     91400   19.6000 -113.3500       7.9       172       104        60
OIR    2025250     91400   19.6000 -113.3600       8.0       172       103        60
OIR    2025250     91400   19.6000 -113.3700       8.0       172       103        60
OIR    2025250     91400   19.6000 -113.3800       8.0       172       103        60
OIR    2025250     91400   19.6000 -113.3900       8.1       172       103        60
OIR    2025250     91400   19.6000 -113.4000       8.1       172       103        60
OIR    2025250     91400   19.6000 -113.4100       8.1       172       103        60
OIR    2025250     91400   19.6000 -113.4200       8.1       172       103        60
OIR    2025250     91400   19.6000 -113.4300       8.2       173       103        60
OIR    2025250     91400   19.6000 -113.4400       8.2       173       103        60
OIR    2025250     91400   19.6000 -113.4500       8.2       173       103        60
OIR    2025250     91400   19.6000 -113.4600       8.3       173       103        60
OIR    2025250     91400   19.6000 -113.4700       8.3       173       103        60
OIR    2025250     91400   19.6000 -113.4800       8.3       173       103        60
OIR    2025250     91400   19.6000 -113.4900       8.4       173       103        60
OIR    2025250     91400   19.6000 -113.5000       8.4       173       103        60
OIR    2025250     91400   19.6000 -113.5100       8.4       173       103        60
OIR    2025250     91400   19.6000 -113.5200       8.5       173       103        60
OIR    2025250     91400   19.6000 -113.5300       8.5       174       103        60
OIR    2025250     91400   19.6000 -113.5400       8.5       174       103        60
OIR    2025250     91400   19.6000 -113.5500       8.5       174       103        60
OIR    2025250     91400   19.6000 -113.5600       8.6       174       103        60
OIR    2025250     91400   19.6000 -113.5700       8.6       174       103        60
OIR    2025250     91400   19.6000 -113.5800       8.6       175       103        60
OIR    2025250     91400   19.6000 -113.5900       8.7       175       103        60
OIR    2025250     91400   19.6000 -113.6000       8.7       175       103        60
OIR    2025250     91400   19.6000 -113.6100       8.7       175       103        60
OIR    2025250     91400   19.6000 -113.6200       8.7       175       103        60
OIR    2025250     91400   19.6000 -113.6300       8.7       175       103        60
OIR    2025250     91400   19.6000 -113.6400       8.8       176       103        60
OIR    2025250     91400   19.6000 -113.6500       8.8       176       103        60
OIR    2025250     91400   19.6000 -113.6600       8.8       176       103        60
OIR    2025250     91400   19.6000 -113.6700       8.8       176       103        60
OIR    2025250     91400   19.6000 -113.6800       8.8       176       103        60
OIR    2025250     91400   19.6000 -113.6900       8.8       176       103        60
OIR    2025250     91400   19.6000 -113.7000       8.8       176       103        60
OIR    2025250     91400   19.6000 -113.7100       8.8       176       103        60
OIR    2025250     91400   19.6000 -113.7200       8.9       176       103        60
OIR    2025250     91400   19.6000 -113.7300       8.9       176       103        60
OIR    2025250     91400   19.6000 -113.7400       8.9       177       103        60
OIR    2025250     91400   19.6000 -113.7500       8.9       177       103        60
OIR    2025250     91400   19.6000 -113.7600       8.9       177       104        60
OIR    2025250     91400   19.6000 -113.7700       8.9       177       104        60
OIR    2025250     91400   19.6000 -113.7800       9.0       177       104        60
OIR    2025250     91400   19.6000 -113.7900       9.0       177       105        60
OIR    2025250     91400   19.6000 -113.8000       9.0       177       105        60
OIR    2025250     91400   19.6000 -113.8100       9.0       178       107        60
OIR    2025250     91400   19.6000 -113.8200       9.0       178       107        60
OIR    2025250     91400   19.6000 -113.8300       9.0       178       107        60
OIR    2025250     91400   19.6000 -113.8400       9.0       178       107        60
OIR    2025250     91400   19.6000 -113.8500       9.1       178       105        60
OIR    2025250     91400   19.6000 -113.8600       9.1       179       105        60
OIR    2025250     91400   19.6000 -113.8700       9.1       179       105        60
OIR    2025250     91400   19.6000 -113.8800       9.1       179       105        60
OIR    2025250     91400   19.6000 -113.8900       9.1       179       104        60
OIR    2025250     91400   19.6000 -113.9000       9.1       179       104        60
OIR    2025250     91400   19.6000 -113.9100       9.1       179       104        60
OIR    2025250     91400   19.6000 -113.9200       9.1       179       103        60
OIR    2025250     91400   19.6000 -113.9300       9.1       179       104        60
OIR    2025250     91400   19.6000 -113.9400       9.1       179       104        60
OIR    2025250     91400   19.6000 -113.9500       9.1       180       104        60
OIR    2025250     91400   19.6000 -113.9600       9.1       180       104        60
OIR    2025250     91400   19.6000 -113.9700       9.1       180       104        60
OIR    2025250     91400   19.6000 -113.9800       9.1       180       104        60
OIR    2025250     91400   19.6000 -113.9900       9.1       180       104        60
OIR    2025250     91400   19.6000 -114.0000       9.1       180       104        60
OIR    2025250     91400   19.6000 -114.0100       9.1       181       104        60
OIR    2025250     91400   19.6000 -114.0200       9.1       181       105        60
OIR    2025250     91400   19.6000 -114.0300       9.0       182       107        60
OIR    2025250     91400   19.6000 -114.0400       9.0       182       105        60
OIR    2025250     91400   19.6000 -114.0500       9.0       183       104        60
OIR    2025250     91400   19.6000 -114.0600       9.0       183       104        60
OIR    2025250     91400   19.6000 -114.0700       8.9       184       104        60
OIR    2025250     91400   19.6000 -114.0800       8.9       184       105        60
OIR    2025250     91400   19.6000 -114.0900       8.9       185       104        60
OIR    2025250     91400   19.6000 -114.1000       8.8       185       104        60
OIR    2025250     91400   19.6000 -114.1100       8.8       186       104        60
OIR    2025250     91400   19.6000 -114.1200       8.8       186       104        60
OIR    2025250     91400   19.6000 -114.1300       8.8       187       105        60
OIR    2025250     91400   19.6000 -114.1400       8.7       187       104        60
OIR    2025250     91400   19.6000 -114.1500       8.7       188       104        60
OIR    2025250     91400   19.6000 -114.1600       8.6       189       105        60
OIR    2025250     91400   19.6000 -114.1700       8.6       189       105        60
OIR    2025250     91400   19.6000 -114.1800       8.5       190       107        60
OIR    2025250     91400   19.6000 -114.1900       8.5       192       108        60
OIR    2025250     91400   19.6000 -114.2000       8.4       193       109        60
OIR    2025250     91400   19.6000 -114.2100       8.4       195       110        60
OIR    2025250     91400   19.6000 -114.2200       8.4       196       111        60
OIR    2025250     91400   19.6000 -114.2300       8.4       197       110        60
OIR    2025250     91400   19.6000 -114.2400       8.4       198       110        60
OIR    2025250     91400   19.6000 -114.2500       8.3       199       109        60
OIR    2025250     91400   19.6000 -114.2600       8.3       200       109        60
OIR    2025250     91400   19.6000 -114.2700       8.3       202       110        60
OIR    2025250     91400   19.6000 -114.2800       8.2       203       112        60
OIR    2025250     91400   19.6000 -114.2900       8.2       208       113        60
OIR    2025250     91400   19.6000 -114.3000       8.3       214       114        60
OIR    2025250     91400   19.6000 -114.3100       8.5       218       115        60
OIR    2025250     91400   19.6000 -114.3200       8.5       218       113        60
OIR    2025250     91400   19.6000 -114.3300       8.5       219       111        60
OIR    2025250     91400   19.6000 -114.3400       8.5       219       112        60
OIR    2025250     91400   19.6000 -114.3500       8.5       219       113        60
OIR    2025250     91400   19.6000 -114.3600       8.5       219       114        60
OIR    2025250     91400   19.6000 -114.3700       8.5       219       114        60
OIR    2025250     91400   19.6000 -114.3800       8.5       219       114        60
OIR    2025250     91400   19.6000 -114.3900       8.5       219       115        60
OIR    2025250     91400   19.6000 -114.4000       8.5       219       115        60
OIR    2025250     91400   19.6000 -114.4100       8.5       219       116        60
OIR    2025250     91400   19.6000 -114.4200       8.5       219       116        60
OIR    2025250     91400   19.6000 -114.4300       8.5       219       117        60
OIR    2025250     91400   19.6000 -114.4400       8.5       219       122        60
OIR    2025250     91400   19.6000 -114.4500       8.5       219       126        60
OIR    2025250     91400   19.6000 -114.4600       8.5       219       127        60
OIR    2025250     91400   19.6000 -114.4700       8.5       219       128        60
OIR    2025250     91400   19.6000 -114.4800       8.5       219       127        60
OIR    2025250     91400   19.6000 -114.4900       8.4       219       125        60
OIR    2025250     91400   19.6000 -114.5000       8.4       219       126        60
OIR    2025250     91400   19.6000 -114.5100       8.3       218       127        60
OIR    2025250     91400   19.6000 -114.5200       8.0       216       127        60
OIR    2025250     91400   19.6000 -114.5300       6.9       202       127        60
OIR    2025250     91400   19.6000 -114.5400       6.4       183       127        60
OIR    2025250     91400   19.6000 -114.5500       6.4       175       128        60
OIR    2025250     91400   19.6000 -114.5600       6.5       173       129        60
OIR    2025250     91400   19.6000 -114.5700       6.5       172       130        60
OIR    2025250     91400   19.6000 -114.5800       6.5       172       130        60
OIR    2025250     91400   19.6000 -114.5900       6.5       171       131        60
OIR    2025250     91400   19.6000 -114.6000       6.5       171       131        60
OIR    2025250     91400   19.6000 -114.6100       6.5       170       131        60
OIR    2025250     91400   19.6000 -114.6200       6.5       170       131        60
OIR    2025250     91400   19.6000 -114.6300       6.5       170       131        60
OIR    2025250     91400   19.6000 -114.6400       6.5       170       132        60
OIR    2025250     91400   19.6000 -114.6500       6.5       170       134        60
OIR    2025250     91400   19.6000 -114.6600       6.5       170       135        60
OIR    2025250     91400   19.6000 -114.6700       6.5       170       136        60
OIR    2025250     91400   19.6000 -114.6800       6.5       170       137        60
OIR    2025250     91400   19.6000 -114.6900       6.5       169       138        60
OIR    2025250     91400   19.6000 -114.7000       6.6       168       139        60
OIR    2025250     91400   19.6000 -115.8400       9.6       190       137        60
OIR    2025250     91400   19.6000 -115.8500       9.8       190       135        60
OIR    2025250     91400   19.6000 -115.8600      10.0       190       135        60
OIR    2025250     91400   19.6000 -115.8700      10.1       189       135        60
OIR    2025250     91400   19.6000 -115.8800      10.1       188       134        60
OIR    2025250     91400   19.6000 -115.8900      10.1       187       133        60
OIR    2025250     91400   19.6000 -115.9000      10.1       185       133        60
OIR    2025250     91400   19.6000 -115.9100      10.2       183       133        60
OIR    2025250     91400   19.6000 -115.9200      10.2       182       134        60
OIR    2025250     91400   19.6000 -115.9300      10.3       181       134        60
OIR    2025250     91400   19.6000 -115.9400      10.4       179       135        60
OIR    2025250     91400   19.6000 -115.9500      10.5       178       136        60
OIR    2025250     91400   19.6000 -115.9600      10.5       178       136        60
OIR    2025250     91400   19.6000 -115.9700      10.5       178       136        60
OIR    2025250     91400   19.6000 -115.9800      10.5       178       136        60
OIR    2025250     91400   19.6000 -115.9900      10.5       178       136        60
OIR    2025250     91400   19.6000 -116.0000      10.6       178       136        60
OIR    2025250     91400   19.6000 -116.0100      10.6       178       138        60
OIR    2025250     91400   19.6000 -116.0200      10.6       178       139        60
OIR    2025250     91400   19.6000 -116.0300      10.6       178       141        60
OIR    2025250     91400   19.6000 -116.2800       8.6       181       137        60
OIR    2025250     91400   19.6000 -116.2900       8.7       184       133        60
OIR    2025250     91400   19.6000 -116.3000       8.8       186       132        60
OIR    2025250     91400   19.6000 -116.3100       8.9       188       131        60
OIR    2025250     91400   19.6000 -116.3200       9.1       193       131        60
OIR    2025250     91400   19.6000 -116.3300       9.5       198       131        60
OIR    2025250     91400   19.6000 -116.3400       9.7       199       132        60
OIR    2025250     91400   19.6000 -116.3500       9.8       201       137        60
OIR    2025250     91400   19.6000 -117.8800       7.3        49       140        60
OIR    2025250     91400   19.6000 -117.8900       7.2        48       138        60
OIR    2025250     91400   19.6000 -117.9000       7.0        47       136        60
OIR    2025250     91400   19.6000 -117.9100       6.9        47       137        60
OIR    2025250     91400   19.6000 -117.9200       6.8        47       138        60
OIR    2025250     91400   19.6000 -117.9300       6.7        48       136        60
OIR    2025250     91400   19.6000 -117.9400       6.6        48       135        60
OIR    2025250     91400   19.6000 -117.9500       6.6        48       134        60
OIR    2025250     91400   19.6000 -117.9600       6.7        50       132        60
OIR    2025250     91400   19.6000 -117.9700       6.8        53       131        60
OIR    2025250     91400   19.6000 -117.9800       6.8        55       130        60
OIR    2025250     91400   19.6000 -117.9900       6.9        59       130        60
OIR    2025250     91400   19.6000 -118.0000       7.1        62       131        60
OIR    2025250     91400   19.6000 -118.0100       7.2        65       132        60
OIR    2025250     91400   19.6000 -118.0200       7.3        67       133        60
OIR    2025250     91400   19.6000 -118.0300       7.3        67       134        60
OIR    2025250     91400   19.6000 -118.0400       7.3        68       136        60
OIR    2025250     91400   19.6000 -118.0500       7.4        68       139        60
OIR    2025250     91400   19.6000 -118.0600       7.4        69       139        60
OIR    2025250     91400   19.6000 -118.0700       7.5        70       139        60
OIR    2025250     91400   19.6000 -118.0800       7.6        71       140        60
OIR    2025250     91400   19.6000 -118.0900       7.9        72       141        60
OIR    2025250     91400   19.5900 -112.8400       7.7       172       138        60
OIR    2025250     91400   19.5900 -112.8500       7.7       172       139        60
OIR    2025250     91400   19.5900 -112.8600       7.7       172       139        60
OIR    2025250     91400   19.5900 -112.8700       7.7       172       139        60
OIR    2025250     91400   19.5900 -112.8800       7.7       172       140        60
OIR    2025250     91400   19.5900 -112.8900       7.7       172       138        60
OIR    2025250     91400   19.5900 -112.9000       7.7       172       137        60
OIR    2025250     91400   19.5900 -112.9100       7.7       172       135        60
OIR    2025250     91400   19.5900 -112.9200       7.8       172       136        60
OIR    2025250     91400   19.5900 -112.9300       7.8       172       136        60
OIR    2025250     91400   19.5900 -112.9400       7.8       172       135        60
OIR    2025250     91400   19.5900 -112.9500       7.8       172       135        60
OIR    2025250     91400   19.5900 -112.9600       7.8       172       134        60
OIR    2025250     91400   19.5900 -112.9700       7.8       172       134        60
OIR    2025250     91400   19.5900 -112.9800       7.8       172       133        60
OIR    2025250     91400   19.5900 -112.9900       7.8       172       131        60
OIR    2025250     91400   19.5900 -113.0000       7.8       172       128        60
OIR    2025250     91400   19.5900 -113.0100       7.8       172       130        60
OIR    2025250     91400   19.5900 -113.0200       7.8       172       132        60
OIR    2025250     91400   19.5900 -113.0300       7.8       172       131        60
OIR    2025250     91400   19.5900 -113.0400       7.8       172       128        60
OIR    2025250     91400   19.5900 -113.0500       7.8       172       126        60
OIR    2025250     91400   19.5900 -113.0600       7.8       172       126        60
OIR    2025250     91400   19.5900 -113.0700       7.8       173       125        60
OIR    2025250     91400   19.5900 -113.0800       7.8       173       123        60
OIR    2025250     91400   19.5900 -113.0900       7.8       173       120        60
OIR    2025250     91400   19.5900 -113.1000       7.8       173       120        60
OIR    2025250     91400   19.5900 -113.1100       7.8       173       120        60
OIR    2025250     91400   19.5900 -113.1200       7.8       173       120        60
OIR    2025250     91400   19.5900 -113.1300       7.7       173       117        60
OIR    2025250     91400   19.5900 -113.1400       7.7       173       116        60
OIR    2025250     91400   19.5900 -113.1500       7.7       173       116        60
OIR    2025250     91400   19.5900 -113.1600       7.7       173       115        60
OIR    2025250     91400   19.5900 -113.1700       7.7       173       115        60
OIR    2025250     91400   19.5900 -113.1800       7.7       173       115        60
OIR    2025250     91400   19.5900 -113.1900       7.7       173       116        60
OIR    2025250     91400   19.5900 -113.2000       7.7       173       116        60
OIR    2025250     91400   19.5900 -113.2100       7.7       173       116        60
OIR    2025250     91400   19.5900 -113.2200       7.7       172       115        60
OIR    2025250     91400   19.5900 -113.2300       7.7       172       113        60
OIR    2025250     91400   19.5900 -113.2400       7.7       172       111        60
OIR    2025250     91400   19.5900 -113.2500       7.7       172       110        60
OIR    2025250     91400   19.5900 -113.2600       7.8       172       108        60
OIR    2025250     91400   19.5900 -113.2700       7.8       172       107        60
OIR    2025250     91400   19.5900 -113.2800       7.8       172       105        60
OIR    2025250     91400   19.5900 -113.2900       7.8       172       105        60
OIR    2025250     91400   19.5900 -113.3000       7.8       172       105        60
OIR    2025250     91400   19.5900 -113.3100       7.8       172       104        60
OIR    2025250     91400   19.5900 -113.3200       7.9       172       104        60
OIR    2025250     91400   19.5900 -113.3300       7.9       172       104        60
OIR    2025250     91400   19.5900 -113.3400       7.9       172       104        60
OIR    2025250     91400   19.5900 -113.3500       7.9       172       104        60
OIR    2025250     91400   19.5900 -113.3600       8.0       172       104        60
OIR    2025250     91400   19.5900 -113.3700       8.0       172       103        60
OIR    2025250     91400   19.5900 -113.3800       8.0       172       103        60
OIR    2025250     91400   19.5900 -113.3900       8.1       172       103        60
OIR    2025250     91400   19.5900 -113.4000       8.1       173       103        60
OIR    2025250     91400   19.5900 -113.4100       8.1       173       103        60
OIR    2025250     91400   19.5900 -113.4200       8.1       173       103        60
OIR    2025250     91400   19.5900 -113.4300       8.2       173       103        60
OIR    2025250     91400   19.5900 -113.4400       8.2       173       103        60
OIR    2025250     91400   19.5900 -113.4500       8.2       173       103        60
OIR    2025250     91400   19.5900 -113.4600       8.3       173       103        60
OIR    2025250     91400   19.5900 -113.4700       8.3       173       103        60
OIR    2025250     91400   19.5900 -113.4800       8.3       173       103        60
OIR    2025250     91400   19.5900 -113.4900       8.4       173       103        60
OIR    2025250     91400   19.5900 -113.5000       8.4       173       103        60
OIR    2025250     91400   19.5900 -113.5100       8.5       174       103        60
OIR    2025250     91400   19.5900 -113.5200       8.5       174       103        60
OIR    2025250     91400   19.5900 -113.5300       8.5       174       103        60
OIR    2025250     91400   19.5900 -113.5400       8.5       174       103        60
OIR    2025250     91400   19.5900 -113.5500       8.6       174       103        60
OIR    2025250     91400   19.5900 -113.5600       8.6       174       103        60
OIR    2025250     91400   19.5900 -113.5700       8.6       175       103        60
OIR    2025250     91400   19.5900 -113.5800       8.7       175       103        60
OIR    2025250     91400   19.5900 -113.5900       8.7       175       103        60
OIR    2025250     91400   19.5900 -113.6000       8.7       175       103        60
OIR    2025250     91400   19.5900 -113.6100       8.7       175       103        60
OIR    2025250     91400   19.5900 -113.6200       8.7       175       103        60
OIR    2025250     91400   19.5900 -113.6300       8.7       176       103        60
OIR    2025250     91400   19.5900 -113.6400       8.8       176       103        60
OIR    2025250     91400   19.5900 -113.6500       8.8       176       103        60
OIR    2025250     91400   19.5900 -113.6600       8.8       176       103        60
OIR    2025250     91400   19.5900 -113.6700       8.8       176       103        60
OIR    2025250     91400   19.5900 -113.6800       8.8       176       103        60
OIR    2025250     91400   19.5900 -113.6900       8.8       176       103        60
OIR    2025250     91400   19.5900 -113.7000       8.8       176       103        60
OIR    2025250     91400   19.5900 -113.7100       8.8       176       103        60
OIR    2025250     91400   19.5900 -113.7200       8.9       176       103        60
OIR    2025250     91400   19.5900 -113.7300       8.9       177       103        60
OIR    2025250     91400   19.5900 -113.7400       8.9       177       103        60
OIR    2025250     91400   19.5900 -113.7500       8.9       177       103        60
OIR    2025250     91400   19.5900 -113.7600       8.9       177       104        60
OIR    2025250     91400   19.5900 -113.7700       8.9       177       104        60
OIR    2025250     91400   19.5900 -113.7800       9.0       177       104        60
OIR    2025250     91400   19.5900 -113.7900       9.0       177       105        60
OIR    2025250     91400   19.5900 -113.8000       9.0       178       105        60
OIR    2025250     91400   19.5900 -113.8100       9.0       178       105        60
OIR    2025250     91400   19.5900 -113.8200       9.0       178       105        60
OIR    2025250     91400   19.5900 -113.8300       9.0       178       105        60
OIR    2025250     91400   19.5900 -113.8400       9.0       178       105        60
OIR    2025250     91400   19.5900 -113.8500       9.1       179       105        60
OIR    2025250     91400   19.5900 -113.8600       9.1       179       104        60
OIR    2025250     91400   19.5900 -113.8700       9.1       179       104        60
OIR    2025250     91400   19.5900 -113.8800       9.1       179       104        60
OIR    2025250     91400   19.5900 -113.8900       9.1       179       104        60
OIR    2025250     91400   19.5900 -113.9000       9.1       179       104        60
OIR    2025250     91400   19.5900 -113.9100       9.1       179       104        60
OIR    2025250     91400   19.5900 -113.9200       9.1       179       103        60
OIR    2025250     91400   19.5900 -113.9300       9.1       179       103        60
OIR    2025250     91400   19.5900 -113.9400       9.1       180       104        60
OIR    2025250     91400   19.5900 -113.9500       9.1       180       104        60
OIR    2025250     91400   19.5900 -113.9600       9.1       180       104        60
OIR    2025250     91400   19.5900 -113.9700       9.1       180       104        60
OIR    2025250     91400   19.5900 -113.9800       9.1       180       104        60
OIR    2025250     91400   19.5900 -113.9900       9.1       180       104        60
OIR    2025250     91400   19.5900 -114.0000       9.1       181       104        60
OIR    2025250     91400   19.5900 -114.0100       9.1       181       104        60
OIR    2025250     91400   19.5900 -114.0200       9.1       181       104        60
OIR    2025250     91400   19.5900 -114.0300       9.1       182       105        60
OIR    2025250     91400   19.5900 -114.0400       9.0       182       105        60
OIR    2025250     91400   19.5900 -114.0500       9.0       183       104        60
OIR    2025250     91400   19.5900 -114.0600       9.0       183       104        60
OIR    2025250     91400   19.5900 -114.0700       9.0       184       104        60
OIR    2025250     91400   19.5900 -114.0800       8.9       184       104        60
OIR    2025250     91400   19.5900 -114.0900       8.9       185       104        60
OIR    2025250     91400   19.5900 -114.1000       8.9       185       104        60
OIR    2025250     91400   19.5900 -114.1100       8.9       186       104        60
OIR    2025250     91400   19.5900 -114.1200       8.9       186       104        60
OIR    2025250     91400   19.5900 -114.1300       8.8       186       104        60
OIR    2025250     91400   19.5900 -114.1400       8.8       187       104        60
OIR    2025250     91400   19.5900 -114.1500       8.7       188       104        60
OIR    2025250     91400   19.5900 -114.1600       8.6       189       104        60
OIR    2025250     91400   19.5900 -114.1700       8.6       189       105        60
OIR    2025250     91400   19.5900 -114.1800       8.5       190       107        60
OIR    2025250     91400   19.5900 -114.1900       8.5       191       108        60
OIR    2025250     91400   19.5900 -114.2000       8.4       193       108        60
OIR    2025250     91400   19.5900 -114.2100       8.4       195       110        60
OIR    2025250     91400   19.5900 -114.2200       8.4       196       111        60
OIR    2025250     91400   19.5900 -114.2300       8.4       197       111        60
OIR    2025250     91400   19.5900 -114.2400       8.3       198       111        60
OIR    2025250     91400   19.5900 -114.2500       8.3       199       110        60
OIR    2025250     91400   19.5900 -114.2600       8.2       200       110        60
OIR    2025250     91400   19.5900 -114.2700       8.1       202       110        60
OIR    2025250     91400   19.5900 -114.2800       8.1       205       111        60
OIR    2025250     91400   19.5900 -114.2900       8.2       209       112        60
OIR    2025250     91400   19.5900 -114.3000       8.3       215       113        60
OIR    2025250     91400   19.5900 -114.3100       8.4       217       114        60
OIR    2025250     91400   19.5900 -114.3200       8.5       218       113        60
OIR    2025250     91400   19.5900 -114.3300       8.5       218       112        60
OIR    2025250     91400   19.5900 -114.3400       8.5       219       112        60
OIR    2025250     91400   19.5900 -114.3500       8.5       219       113        60
OIR    2025250     91400   19.5900 -114.3600       8.5       219       114        60
OIR    2025250     91400   19.5900 -114.3700       8.5       219       114        60
OIR    2025250     91400   19.5900 -114.3800       8.5       219       114        60
OIR    2025250     91400   19.5900 -114.3900       8.5       219       115        60
OIR    2025250     91400   19.5900 -114.4000       8.5       219       116        60
OIR    2025250     91400   19.5900 -114.4100       8.5       219       116        60
OIR    2025250     91400   19.5900 -114.4200       8.5       219       117        60
OIR    2025250     91400   19.5900 -114.4300       8.5       220       119        60
OIR    2025250     91400   19.5900 -114.4400       8.5       220       122        60
OIR    2025250     91400   19.5900 -114.4500       8.5       219       125        60
OIR    2025250     91400   19.5900 -114.4600       8.5       219       127        60
OIR    2025250     91400   19.5900 -114.4700       8.4       219       129        60
OIR    2025250     91400   19.5900 -114.4800       8.4       219       128        60
OIR    2025250     91400   19.5900 -114.4900       8.4       219       126        60
OIR    2025250     91400   19.5900 -114.5000       8.4       219       126        60
OIR    2025250     91400   19.5900 -114.5100       8.3       218       126        60
OIR    2025250     91400   19.5900 -114.5200       8.0       215       127        60
OIR    2025250     91400   19.5900 -114.5300       6.9       202       127        60
OIR    2025250     91400   19.5900 -114.5400       6.4       183       127        60
OIR    2025250     91400   19.5900 -114.5500       6.4       175       128        60
OIR    2025250     91400   19.5900 -114.5600       6.5       173       128        60
OIR    2025250     91400   19.5900 -114.5700       6.5       172       129        60
OIR    2025250     91400   19.5900 -114.5800       6.5       171       131        60
OIR    2025250     91400   19.5900 -114.5900       6.5       171       132        60
OIR    2025250     91400   19.5900 -114.6000       6.5       171       132        60
OIR    2025250     91400   19.5900 -114.6100       6.5       170       132        60
OIR    2025250     91400   19.5900 -114.6200       6.5       170       131        60
OIR    2025250     91400   19.5900 -114.6300       6.5       170       130        60
OIR    2025250     91400   19.5900 -114.6400       6.5       170       132        60
OIR    2025250     91400   19.5900 -114.6500       6.5       170       133        60
OIR    2025250     91400   19.5900 -114.6600       6.5       170       135        60
OIR    2025250     91400   19.5900 -114.6700       6.5       170       136        60
OIR    2025250     91400   19.5900 -114.6800       6.5       170       137        60
OIR    2025250     91400   19.5900 -114.6900       6.6       169       137        60
OIR    2025250     91400   19.5900 -114.7000       6.6       168       138        60
OIR    2025250     91400   19.5900 -114.7100       6.7       165       141        60
OIR    2025250     91400   19.5900 -115.8400       9.9       191       139        60
OIR    2025250     91400   19.5900 -115.8500      10.0       190       136        60
OIR    2025250     91400   19.5900 -115.8600      10.1       190       136        60
OIR    2025250     91400   19.5900 -115.8700      10.2       190       135        60
OIR    2025250     91400   19.5900 -115.8800      10.2       189       134        60
OIR    2025250     91400   19.5900 -115.8900      10.2       188       134        60
OIR    2025250     91400   19.5900 -115.9000      10.2       187       133        60
OIR    2025250     91400   19.5900 -115.9100      10.3       185       133        60
OIR    2025250     91400   19.5900 -115.9200      10.3       183       133        60
OIR    2025250     91400   19.5900 -115.9300      10.4       181       134        60
OIR    2025250     91400   19.5900 -115.9400      10.4       179       134        60
OIR    2025250     91400   19.5900 -115.9500      10.5       179       135        60
OIR    2025250     91400   19.5900 -115.9600      10.5       178       136        60
OIR    2025250     91400   19.5900 -115.9700      10.5       178       136        60
OIR    2025250     91400   19.5900 -115.9800      10.5       178       136        60
OIR    2025250     91400   19.5900 -115.9900      10.5       178       136        60
OIR    2025250     91400   19.5900 -116.0000      10.6       178       135        60
OIR    2025250     91400   19.5900 -116.0100      10.6       178       136        60
OIR    2025250     91400   19.5900 -116.0200      10.6       178       137        60
OIR    2025250     91400   19.5900 -116.0300      10.6       178       140        60
OIR    2025250     91400   19.5900 -116.2700       8.2       181       140        60
OIR    2025250     91400   19.5900 -116.2800       8.3       183       137        60
OIR    2025250     91400   19.5900 -116.2900       8.4       185       134        60
OIR    2025250     91400   19.5900 -116.3000       8.5       188       132        60
OIR    2025250     91400   19.5900 -116.3100       8.6       190       132        60
OIR    2025250     91400   19.5900 -116.3200       8.9       193       131        60
OIR    2025250     91400   19.5900 -116.3300       9.3       197       131        60
OIR    2025250     91400   19.5900 -116.3400       9.5       199       131        60
OIR    2025250     91400   19.5900 -116.3500       9.5       200       134        60
OIR    2025250     91400   19.5900 -116.3600       9.5       202       137        60
OIR    2025250     91400   19.5900 -116.3700       9.6       203       140        60
OIR    2025250     91400   19.5900 -117.9000       6.9        55       139        60
OIR    2025250     91400   19.5900 -117.9100       6.8        55       139        60
OIR    2025250     91400   19.5900 -117.9200       6.7        54       139        60
OIR    2025250     91400   19.5900 -117.9300       6.6        54       138        60
OIR    2025250     91400   19.5900 -117.9400       6.4        55       136        60
OIR    2025250     91400   19.5900 -117.9500       6.5        56       135        60
OIR    2025250     91400   19.5900 -117.9600       6.5        56       134        60
OIR    2025250     91400   19.5900 -117.9700       6.7        57       133        60
OIR    2025250     91400   19.5900 -117.9800       6.8        59       132        60
OIR    2025250     91400   19.5900 -117.9900       7.0        62       131        60
OIR    2025250     91400   19.5900 -118.0000       7.1        64       131        60
OIR    2025250     91400   19.5900 -118.0100       7.2        66       132        60
OIR    2025250     91400   19.5900 -118.0200       7.3        67       133        60
OIR    2025250     91400   19.5900 -118.0300       7.3        68       134        60
OIR    2025250     91400   19.5900 -118.0400       7.4        68       137        60
OIR    2025250     91400   19.5900 -118.0500       7.4        68       140        60
OIR    2025250     91400   19.5900 -118.0600       7.5        69       142        60
OIR    2025250     91400   19.5900 -118.0700       7.6        69       142        60
OIR    2025250     91400   19.5900 -118.0800       7.7        70       142        60
OIR    2025250     91400   19.5800 -112.8400       7.7       172       138        60
OIR    2025250     91400   19.5800 -112.8500       7.7       172       139        60
OIR    2025250     91400   19.5800 -112.8600       7.7       172       140        60
OIR    2025250     91400   19.5800 -112.8700       7.7       172       140        60
OIR    2025250     91400   19.5800 -112.8800       7.7       173       140        60
OIR    2025250     91400   19.5800 -112.8900       7.7       172       138        60
OIR    2025250     91400   19.5800 -112.9000       7.7       172       135        60
OIR    2025250     91400   19.5800 -112.9100       7.7       172       133        60
OIR    2025250     91400   19.5800 -112.9200       7.8       172       135        60
OIR    2025250     91400   19.5800 -112.9300       7.8       173       137        60
OIR    2025250     91400   19.5800 -112.9400       7.8       173       137        60
OIR    2025250     91400   19.5800 -112.9500       7.8       172       135        60
OIR    2025250     91400   19.5800 -112.9600       7.8       172       134        60
OIR    2025250     91400   19.5800 -112.9700       7.8       172       134        60
OIR    2025250     91400   19.5800 -112.9800       7.8       172       134        60
OIR    2025250     91400   19.5800 -112.9900       7.8       172       130        60
OIR    2025250     91400   19.5800 -113.0000       7.8       172       126        60
OIR    2025250     91400   19.5800 -113.0100       7.8       172       127        60
OIR    2025250     91400   19.5800 -113.0200       7.8       172       131        60
OIR    2025250     91400   19.5800 -113.0300       7.8       172       131        60
OIR    2025250     91400   19.5800 -113.0400       7.8       173       127        60
OIR    2025250     91400   19.5800 -113.0500       7.8       173       123        60
OIR    2025250     91400   19.5800 -113.0600       7.8       173       122        60
OIR    2025250     91400   19.5800 -113.0700       7.8       173       121        60
OIR    2025250     91400   19.5800 -113.0800       7.8       173       120        60
OIR    2025250     91400   19.5800 -113.0900       7.8       173       119        60
OIR    2025250     91400   19.5800 -113.1000       7.8       173       120        60
OIR    2025250     91400   19.5800 -113.1100       7.8       173       122        60
OIR    2025250     91400   19.5800 -113.1200       7.7       173       123        60
OIR    2025250     91400   19.5800 -113.1300       7.7       173       120        60
OIR    2025250     91400   19.5800 -113.1400       7.7       173       116        60
OIR    2025250     91400   19.5800 -113.1500       7.7       173       115        60
OIR    2025250     91400   19.5800 -113.1600       7.7       173       113        60
OIR    2025250     91400   19.5800 -113.1700       7.7       173       113        60
OIR    2025250     91400   19.5800 -113.1800       7.7       173       115        60
OIR    2025250     91400   19.5800 -113.1900       7.7       173       116        60
OIR    2025250     91400   19.5800 -113.2000       7.7       173       116        60
OIR    2025250     91400   19.5800 -113.2100       7.7       173       116        60
OIR    2025250     91400   19.5800 -113.2200       7.7       173       114        60
OIR    2025250     91400   19.5800 -113.2300       7.7       173       112        60
OIR    2025250     91400   19.5800 -113.2400       7.7       172       111        60
OIR    2025250     91400   19.5800 -113.2500       7.8       172       109        60
OIR    2025250     91400   19.5800 -113.2600       7.8       172       108        60
OIR    2025250     91400   19.5800 -113.2700       7.8       172       107        60
OIR    2025250     91400   19.5800 -113.2800       7.8       172       105        60
OIR    2025250     91400   19.5800 -113.2900       7.8       172       105        60
OIR    2025250     91400   19.5800 -113.3000       7.8       173       105        60
OIR    2025250     91400   19.5800 -113.3100       7.8       173       104        60
OIR    2025250     91400   19.5800 -113.3200       7.9       173       104        60
OIR    2025250     91400   19.5800 -113.3300       7.9       173       104        60
OIR    2025250     91400   19.5800 -113.3400       7.9       173       104        60
OIR    2025250     91400   19.5800 -113.3500       7.9       173       104        60
OIR    2025250     91400   19.5800 -113.3600       8.0       173       104        60
OIR    2025250     91400   19.5800 -113.3700       8.0       173       103        60
OIR    2025250     91400   19.5800 -113.3800       8.0       173       103        60
OIR    2025250     91400   19.5800 -113.3900       8.0       173       103        60
OIR    2025250     91400   19.5800 -113.4000       8.1       173       103        60
OIR    2025250     91400   19.5800 -113.4100       8.1       173       103        60
OIR    2025250     91400   19.5800 -113.4200       8.1       173       103        60
OIR    2025250     91400   19.5800 -113.4300       8.2       173       103        60
OIR    2025250     91400   19.5800 -113.4400       8.2       173       103        60
OIR    2025250     91400   19.5800 -113.4500       8.2       173       103        60
OIR    2025250     91400   19.5800 -113.4600       8.3       173       103        60
OIR    2025250     91400   19.5800 -113.4700       8.3       173       103        60
OIR    2025250     91400   19.5800 -113.4800       8.3       173       103        60
OIR    2025250     91400   19.5800 -113.4900       8.4       173       103        60
OIR    2025250     91400   19.5800 -113.5000       8.4       174       103        60
OIR    2025250     91400   19.5800 -113.5100       8.5       174       103        60
OIR    2025250     91400   19.5800 -113.5200       8.5       174       103        60
OIR    2025250     91400   19.5800 -113.5300       8.5       174       103        60
OIR    2025250     91400   19.5800 -113.5400       8.6       174       103        60
OIR    2025250     91400   19.5800 -113.5500       8.6       175       103        60
OIR    2025250     91400   19.5800 -113.5600       8.6       175       103        60
OIR    2025250     91400   19.5800 -113.5700       8.6       175       103        60
OIR    2025250     91400   19.5800 -113.5800       8.7       175       103        60
OIR    2025250     91400   19.5800 -113.5900       8.7       175       103        60
OIR    2025250     91400   19.5800 -113.6000       8.7       175       103        60
OIR    2025250     91400   19.5800 -113.6100       8.7       175       103        60
OIR    2025250     91400   19.5800 -113.6200       8.7       176       103        60
OIR    2025250     91400   19.5800 -113.6300       8.7       176       103        60
OIR    2025250     91400   19.5800 -113.6400       8.8       176       103        60
OIR    2025250     91400   19.5800 -113.6500       8.8       176       103        60
OIR    2025250     91400   19.5800 -113.6600       8.8       176       103        60
OIR    2025250     91400   19.5800 -113.6700       8.8       176       103        60
OIR    2025250     91400   19.5800 -113.6800       8.8       176       103        60
OIR    2025250     91400   19.5800 -113.6900       8.8       176       103        60
OIR    2025250     91400   19.5800 -113.7000       8.8       176       103        60
OIR    2025250     91400   19.5800 -113.7100       8.9       176       103        60
OIR    2025250     91400   19.5800 -113.7200       8.9       177       103        60
OIR    2025250     91400   19.5800 -113.7300       8.9       177       103        60
OIR    2025250     91400   19.5800 -113.7400       8.9       177       103        60
OIR    2025250     91400   19.5800 -113.7500       8.9       177       103        60
OIR    2025250     91400   19.5800 -113.7600       8.9       177       104        60
OIR    2025250     91400   19.5800 -113.7700       8.9       177       104        60
OIR    2025250     91400   19.5800 -113.7800       9.0       177       104        60
OIR    2025250     91400   19.5800 -113.7900       9.0       177       105        60
OIR    2025250     91400   19.5800 -113.8000       9.0       178       105        60
OIR    2025250     91400   19.5800 -113.8100       9.0       178       105        60
OIR    2025250     91400   19.5800 -113.8200       9.0       178       104        60
OIR    2025250     91400   19.5800 -113.8300       9.0       178       104        60
OIR    2025250     91400   19.5800 -113.8400       9.0       178       104        60
OIR    2025250     91400   19.5800 -113.8500       9.1       179       104        60
OIR    2025250     91400   19.5800 -113.8600       9.1       179       104        60
OIR    2025250     91400   19.5800 -113.8700       9.1       179       104        60
OIR    2025250     91400   19.5800 -113.8800       9.1       179       104        60
OIR    2025250     91400   19.5800 -113.8900       9.1       179       104        60
OIR    2025250     91400   19.5800 -113.9000       9.1       179       104        60
OIR    2025250     91400   19.5800 -113.9100       9.1       179       104        60
OIR    2025250     91400   19.5800 -113.9200       9.1       179       104        60
OIR    2025250     91400   19.5800 -113.9300       9.1       180       104        60
OIR    2025250     91400   19.5800 -113.9400       9.1       180       104        60
OIR    2025250     91400   19.5800 -113.9500       9.1       180       104        60
OIR    2025250     91400   19.5800 -113.9600       9.1       180       104        60
OIR    2025250     91400   19.5800 -113.9700       9.1       180       104        60
OIR    2025250     91400   19.5800 -113.9800       9.1       180       104        60
OIR    2025250     91400   19.5800 -113.9900       9.1       181       104        60
OIR    2025250     91400   19.5800 -114.0000       9.1       181       104        60
OIR    2025250     91400   19.5800 -114.0100       9.1       181       104        60
OIR    2025250     91400   19.5800 -114.0200       9.1       182       104        60
OIR    2025250     91400   19.5800 -114.0300       9.1       182       104        60
OIR    2025250     91400   19.5800 -114.0400       9.1       182       105        60
OIR    2025250     91400   19.5800 -114.0500       9.1       183       104        60
OIR    2025250     91400   19.5800 -114.0600       9.0       183       104        60
OIR    2025250     91400   19.5800 -114.0700       9.0       184       104        60
OIR    2025250     91400   19.5800 -114.0800       9.0       184       104        60
OIR    2025250     91400   19.5800 -114.0900       9.0       185       104        60
OIR    2025250     91400   19.5800 -114.1000       9.0       185       104        60
OIR    2025250     91400   19.5800 -114.1100       8.9       185       104        60
OIR    2025250     91400   19.5800 -114.1200       8.9       186       104        60
OIR    2025250     91400   19.5800 -114.1300       8.9       186       104        60
OIR    2025250     91400   19.5800 -114.1400       8.8       187       104        60
OIR    2025250     91400   19.5800 -114.1500       8.8       188       104        60
OIR    2025250     91400   19.5800 -114.1600       8.7       188       104        60
OIR    2025250     91400   19.5800 -114.1700       8.6       189       105        60
OIR    2025250     91400   19.5800 -114.1800       8.6       190       107        60
OIR    2025250     91400   19.5800 -114.1900       8.5       191       107        60
OIR    2025250     91400   19.5800 -114.2000       8.5       192       108        60
OIR    2025250     91400   19.5800 -114.2100       8.4       194       109        60
OIR    2025250     91400   19.5800 -114.2200       8.4       196       110        60
OIR    2025250     91400   19.5800 -114.2300       8.3       196       111        60
OIR    2025250     91400   19.5800 -114.2400       8.3       198       111        60
OIR    2025250     91400   19.5800 -114.2500       8.2       199       111        60
OIR    2025250     91400   19.5800 -114.2600       8.1       201       110        60
OIR    2025250     91400   19.5800 -114.2700       8.1       203       110        60
OIR    2025250     91400   19.5800 -114.2800       8.0       205       111        60
OIR    2025250     91400   19.5800 -114.2900       8.1       209       111        60
OIR    2025250     91400   19.5800 -114.3000       8.3       215       112        60
OIR    2025250     91400   19.5800 -114.3100       8.4       217       113        60
OIR    2025250     91400   19.5800 -114.3200       8.5       218       113        60
OIR    2025250     91400   19.5800 -114.3300       8.5       218       113        60
OIR    2025250     91400   19.5800 -114.3400       8.5       219       113        60
OIR    2025250     91400   19.5800 -114.3500       8.5       219       114        60
OIR    2025250     91400   19.5800 -114.3600       8.5       219       114        60
OIR    2025250     91400   19.5800 -114.3700       8.5       219       114        60
OIR    2025250     91400   19.5800 -114.3800       8.5       219       114        60
OIR    2025250     91400   19.5800 -114.3900       8.5       219       115        60
OIR    2025250     91400   19.5800 -114.4000       8.5       219       116        60
OIR    2025250     91400   19.5800 -114.4100       8.5       219       117        60
OIR    2025250     91400   19.5800 -114.4200       8.4       220       119        60
OIR    2025250     91400   19.5800 -114.4300       8.4       220       120        60
OIR    2025250     91400   19.5800 -114.4400       8.4       220       122        60
OIR    2025250     91400   19.5800 -114.4500       8.4       220       125        60
OIR    2025250     91400   19.5800 -114.4600       8.4       219       127        60
OIR    2025250     91400   19.5800 -114.4700       8.4       219       129        60
OIR    2025250     91400   19.5800 -114.4800       8.4       219       129        60
OIR    2025250     91400   19.5800 -114.4900       8.4       219       129        60
OIR    2025250     91400   19.5800 -114.5000       8.3       218       128        60
OIR    2025250     91400   19.5800 -114.5100       8.3       218       128        60
OIR    2025250     91400   19.5800 -114.5200       8.0       215       127        60
OIR    2025250     91400   19.5800 -114.5300       7.0       201       127        60
OIR    2025250     91400   19.5800 -114.5400       6.5       183       127        60
OIR    2025250     91400   19.5800 -114.5500       6.4       175       127        60
OIR    2025250     91400   19.5800 -114.5600       6.5       173       128        60
OIR    2025250     91400   19.5800 -114.5700       6.5       172       129        60
OIR    2025250     91400   19.5800 -114.5800       6.5       171       130        60
OIR    2025250     91400   19.5800 -114.5900       6.5       171       132        60
OIR    2025250     91400   19.5800 -114.6000       6.5       171       133        60
OIR    2025250     91400   19.5800 -114.6100       6.5       170       134        60
OIR    2025250     91400   19.5800 -114.6200       6.5       170       132        60
OIR    2025250     91400   19.5800 -114.6300       6.5       170       131        60
OIR    2025250     91400   19.5800 -114.6400       6.5       170       131        60
OIR    2025250     91400   19.5800 -114.6500       6.5       170       133        60
OIR    2025250     91400   19.5800 -114.6600       6.5       170       134        60
OIR    2025250     91400   19.5800 -114.6700       6.5       170       135        60
OIR    2025250     91400   19.5800 -114.6800       6.5       169       136        60
OIR    2025250     91400   19.5800 -114.6900       6.6       168       137        60
OIR    2025250     91400   19.5800 -114.7000       6.7       166       138        60
OIR    2025250     91400   19.5800 -114.7100       6.8       164       140        60
OIR    2025250     91400   19.5800 -115.8400      10.0       192       141        60
OIR    2025250     91400   19.5800 -115.8500      10.1       191       138        60
OIR    2025250     91400   19.5800 -115.8600      10.1       191       137        60
OIR    2025250     91400   19.5800 -115.8700      10.2       190       137        60
OIR    2025250     91400   19.5800 -115.8800      10.3       190       136        60
OIR    2025250     91400   19.5800 -115.8900      10.3       189       135        60
OIR    2025250     91400   19.5800 -115.9000      10.3       188       135        60
OIR    2025250     91400   19.5800 -115.9100      10.3       186       134        60
OIR    2025250     91400   19.5800 -115.9200      10.4       184       134        60
OIR    2025250     91400   19.5800 -115.9300      10.4       182       134        60
OIR    2025250     91400   19.5800 -115.9400      10.5       180       134        60
OIR    2025250     91400   19.5800 -115.9500      10.5       179       134        60
OIR    2025250     91400   19.5800 -115.9600      10.5       178       135        60
OIR    2025250     91400   19.5800 -115.9700      10.5       178       135        60
OIR    2025250     91400   19.5800 -115.9800      10.5       178       136        60
OIR    2025250     91400   19.5800 -115.9900      10.6       178       136        60
OIR    2025250     91400   19.5800 -116.0000      10.6       178       136        60
OIR    2025250     91400   19.5800 -116.0100      10.6       178       137        60
OIR    2025250     91400   19.5800 -116.0200      10.6       178       138        60
OIR    2025250     91400   19.5800 -116.0300      10.6       178       140        60
OIR    2025250     91400   19.5800 -116.2700       8.1       184       138        60
OIR    2025250     91400   19.5800 -116.2800       8.2       185       135        60
OIR    2025250     91400   19.5800 -116.2900       8.3       187       134        60
OIR    2025250     91400   19.5800 -116.3000       8.5       189       132        60
OIR    2025250     91400   19.5800 -116.3100       8.5       190       132        60
OIR    2025250     91400   19.5800 -116.3200       8.6       192       131        60
OIR    2025250     91400   19.5800 -116.3300       8.9       195       131        60
OIR    2025250     91400   19.5800 -116.3400       9.1       198       130        60
OIR    2025250     91400   19.5800 -116.3500       9.2       200       131        60
OIR    2025250     91400   19.5800 -116.3600       9.1       201       132        60
OIR    2025250     91400   19.5800 -116.3700       8.8       203       135        60
OIR    2025250     91400   19.5800 -116.3800       8.7       205       138        60
OIR    2025250     91400   19.5800 -116.3900       9.1       206       137        60
OIR    2025250     91400   19.5800 -116.4000       8.9       207       136        60
OIR    2025250     91400   19.5800 -116.4100       8.6       208       139        60
OIR    2025250     91400   19.5800 -117.9100       6.8        59       141        60
OIR    2025250     91400   19.5800 -117.9200       6.6        59       141        60
OIR    2025250     91400   19.5800 -117.9300       6.5        60       139        60
OIR    2025250     91400   19.5800 -117.9400       6.4        61       137        60
OIR    2025250     91400   19.5800 -117.9500       6.5        62       136        60
OIR    2025250     91400   19.5800 -117.9600       6.5        62       136        60
OIR    2025250     91400   19.5800 -117.9700       6.6        63       136        60
OIR    2025250     91400   19.5800 -117.9800       6.8        64       134        60
OIR    2025250     91400   19.5800 -117.9900       6.9        65       132        60
OIR    2025250     91400   19.5800 -118.0000       7.1        65       132        60
OIR    2025250     91400   19.5800 -118.0100       7.2        66       132        60
OIR    2025250     91400   19.5800 -118.0200       7.3        67       133        60
OIR    2025250     91400   19.5800 -118.0300       7.3        68       135        60
OIR    2025250     91400   19.5800 -118.0400       7.4        68       138        60
OIR    2025250     91400   19.5800 -118.0500       7.4        68       142        60
OIR    2025250     91400   19.5700 -112.8400       7.7       173       141        60
OIR    2025250     91400   19.5700 -112.8500       7.7       173       141        60
OIR    2025250     91400   19.5700 -112.8600       7.7       173       141        60
OIR    2025250     91400   19.5700 -112.8700       7.7       173       141        60
OIR    2025250     91400   19.5700 -112.8800       7.7       173       140        60
OIR    2025250     91400   19.5700 -112.8900       7.7       173       139        60
OIR    2025250     91400   19.5700 -112.9000       7.7       173       137        60
OIR    2025250     91400   19.5700 -112.9100       7.7       173       135        60
OIR    2025250     91400   19.5700 -112.9200       7.8       173       135        60
OIR    2025250     91400   19.5700 -112.9300       7.8       173       135        60
OIR    2025250     91400   19.5700 -112.9400       7.8       173       135        60
OIR    2025250     91400   19.5700 -112.9500       7.8       173       135        60
OIR    2025250     91400   19.5700 -112.9600       7.8       173       134        60
OIR    2025250     91400   19.5700 -112.9700       7.8       173       132        60
OIR    2025250     91400   19.5700 -112.9800       7.8       173       130        60
OIR    2025250     91400   19.5700 -112.9900       7.8       173       128        60
OIR    2025250     91400   19.5700 -113.0000       7.8       173       126        60
OIR    2025250     91400   19.5700 -113.0100       7.8       173       126        60
OIR    2025250     91400   19.5700 -113.0200       7.8       173       130        60
OIR    2025250     91400   19.5700 -113.0300       7.8       173       132        60
OIR    2025250     91400   19.5700 -113.0400       7.8       173       129        60
OIR    2025250     91400   19.5700 -113.0500       7.8       173       126        60
OIR    2025250     91400   19.5700 -113.0600       7.8       173       124        60
OIR    2025250     91400   19.5700 -113.0700       7.8       173       121        60
OIR    2025250     91400   19.5700 -113.0800       7.8       173       120        60
OIR    2025250     91400   19.5700 -113.0900       7.8       173       120        60
OIR    2025250     91400   19.5700 -113.1000       7.8       173       120        60
OIR    2025250     91400   19.5700 -113.1100       7.8       173       121        60
OIR    2025250     91400   19.5700 -113.1200       7.7       173       122        60
OIR    2025250     91400   19.5700 -113.1300       7.7       173       120        60
OIR    2025250     91400   19.5700 -113.1400       7.7       173       116        60
OIR    2025250     91400   19.5700 -113.1500       7.7       173       115        60
OIR    2025250     91400   19.5700 -113.1600       7.7       173       113        60
OIR    2025250     91400   19.5700 -113.1700       7.7       173       112        60
OIR    2025250     91400   19.5700 -113.1800       7.7       173       114        60
OIR    2025250     91400   19.5700 -113.1900       7.7       173       116        60
OIR    2025250     91400   19.5700 -113.2000       7.7       173       116        60
OIR    2025250     91400   19.5700 -113.2100       7.7       173       115        60
OIR    2025250     91400   19.5700 -113.2200       7.7       173       113        60
OIR    2025250     91400   19.5700 -113.2300       7.7       173       112        60
OIR    2025250     91400   19.5700 -113.2400       7.7       173       110        60
OIR    2025250     91400   19.5700 -113.2500       7.8       173       109        60
OIR    2025250     91400   19.5700 -113.2600       7.8       173       108        60
OIR    2025250     91400   19.5700 -113.2700       7.8       172       107        60
OIR    2025250     91400   19.5700 -113.2800       7.8       173       107        60
OIR    2025250     91400   19.5700 -113.2900       7.8       173       105        60
OIR    2025250     91400   19.5700 -113.3000       7.8       173       105        60
OIR    2025250     91400   19.5700 -113.3100       7.8       173       104        60
OIR    2025250     91400   19.5700 -113.3200       7.9       173       104        60
OIR    2025250     91400   19.5700 -113.3300       7.9       173       104        60
OIR    2025250     91400   19.5700 -113.3400       7.9       173       104        60
OIR    2025250     91400   19.5700 -113.3500       7.9       173       104        60
OIR    2025250     91400   19.5700 -113.3600       8.0       173       104        60
OIR    2025250     91400   19.5700 -113.3700       8.0       173       103        60
OIR    2025250     91400   19.5700 -113.3800       8.0       173       103        60
OIR    2025250     91400   19.5700 -113.3900       8.0       173       103        60
OIR    2025250     91400   19.5700 -113.4000       8.1       173       103        60
OIR    2025250     91400   19.5700 -113.4100       8.1       173       103        60
OIR    2025250     91400   19.5700 -113.4200       8.1       173       103        60
OIR    2025250     91400   19.5700 -113.4300       8.2       173       103        60
OIR    2025250     91400   19.5700 -113.4400       8.2       173       103        60
OIR    2025250     91400   19.5700 -113.4500       8.2       173       103        60
OIR    2025250     91400   19.5700 -113.4600       8.3       173       103        60
OIR    2025250     91400   19.5700 -113.4700       8.3       173       103        60
OIR    2025250     91400   19.5700 -113.4800       8.4       173       103        60
OIR    2025250     91400   19.5700 -113.4900       8.4       174       103        60
OIR    2025250     91400   19.5700 -113.5000       8.4       174       103        60
OIR    2025250     91400   19.5700 -113.5100       8.5       174       103        60
OIR    2025250     91400   19.5700 -113.5200       8.5       174       103        60
OIR    2025250     91400   19.5700 -113.5300       8.6       174       103        60
OIR    2025250     91400   19.5700 -113.5400       8.6       175       103        60
OIR    2025250     91400   19.5700 -113.5500       8.6       175       103        60
OIR    2025250     91400   19.5700 -113.5600       8.6       175       103        60
OIR    2025250     91400   19.5700 -113.5700       8.7       175       103        60
OIR    2025250     91400   19.5700 -113.5800       8.7       175       103        60
OIR    2025250     91400   19.5700 -113.5900       8.7       175       103        60
OIR    2025250     91400   19.5700 -113.6000       8.7       175       103        60
OIR    2025250     91400   19.5700 -113.6100       8.7       176       103        60
OIR    2025250     91400   19.5700 -113.6200       8.7       176       103        60
OIR    2025250     91400   19.5700 -113.6300       8.7       176       103        60
OIR    2025250     91400   19.5700 -113.6400       8.8       176       103        60
OIR    2025250     91400   19.5700 -113.6500       8.8       176       103        60
OIR    2025250     91400   19.5700 -113.6600       8.8       176       103        60
OIR    2025250     91400   19.5700 -113.6700       8.8       176       103        60
OIR    2025250     91400   19.5700 -113.6800       8.8       176       103        60
OIR    2025250     91400   19.5700 -113.6900       8.8       176       103        60
OIR    2025250     91400   19.5700 -113.7000       8.8       176       103        60
OIR    2025250     91400   19.5700 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.5700 -113.7200       8.9       177       103        60
OIR    2025250     91400   19.5700 -113.7300       8.9       177       103        60
OIR    2025250     91400   19.5700 -113.7400       8.9       177       103        60
OIR    2025250     91400   19.5700 -113.7500       8.9       177       103        60
OIR    2025250     91400   19.5700 -113.7600       8.9       177       104        60
OIR    2025250     91400   19.5700 -113.7700       9.0       177       104        60
OIR    2025250     91400   19.5700 -113.7800       9.0       177       104        60
OIR    2025250     91400   19.5700 -113.7900       9.0       178       105        60
OIR    2025250     91400   19.5700 -113.8000       9.0       178       105        60
OIR    2025250     91400   19.5700 -113.8100       9.0       178       105        60
OIR    2025250     91400   19.5700 -113.8200       9.0       178       104        60
OIR    2025250     91400   19.5700 -113.8300       9.0       178       104        60
OIR    2025250     91400   19.5700 -113.8400       9.1       178       104        60
OIR    2025250     91400   19.5700 -113.8500       9.1       179       104        60
OIR    2025250     91400   19.5700 -113.8600       9.1       179       104        60
OIR    2025250     91400   19.5700 -113.8700       9.1       179       104        60
OIR    2025250     91400   19.5700 -113.8800       9.1       179       104        60
OIR    2025250     91400   19.5700 -113.8900       9.1       179       104        60
OIR    2025250     91400   19.5700 -113.9000       9.1       179       104        60
OIR    2025250     91400   19.5700 -113.9100       9.1       179       104        60
OIR    2025250     91400   19.5700 -113.9200       9.1       180       104        60
OIR    2025250     91400   19.5700 -113.9300       9.1       180       104        60
OIR    2025250     91400   19.5700 -113.9400       9.2       180       104        60
OIR    2025250     91400   19.5700 -113.9500       9.2       180       104        60
OIR    2025250     91400   19.5700 -113.9600       9.2       180       104        60
OIR    2025250     91400   19.5700 -113.9700       9.2       180       104        60
OIR    2025250     91400   19.5700 -113.9800       9.2       181       104        60
OIR    2025250     91400   19.5700 -113.9900       9.2       181       104        60
OIR    2025250     91400   19.5700 -114.0000       9.2       181       104        60
OIR    2025250     91400   19.5700 -114.0100       9.1       181       104        60
OIR    2025250     91400   19.5700 -114.0200       9.1       182       104        60
OIR    2025250     91400   19.5700 -114.0300       9.1       182       104        60
OIR    2025250     91400   19.5700 -114.0400       9.1       183       104        60
OIR    2025250     91400   19.5700 -114.0500       9.1       183       104        60
OIR    2025250     91400   19.5700 -114.0600       9.1       183       104        60
OIR    2025250     91400   19.5700 -114.0700       9.1       184       104        60
OIR    2025250     91400   19.5700 -114.0800       9.0       184       104        60
OIR    2025250     91400   19.5700 -114.0900       9.0       185       104        60
OIR    2025250     91400   19.5700 -114.1000       9.0       185       104        60
OIR    2025250     91400   19.5700 -114.1100       9.0       185       104        60
OIR    2025250     91400   19.5700 -114.1200       9.0       186       104        60
OIR    2025250     91400   19.5700 -114.1300       8.9       186       104        60
OIR    2025250     91400   19.5700 -114.1400       8.9       187       104        60
OIR    2025250     91400   19.5700 -114.1500       8.8       187       105        60
OIR    2025250     91400   19.5700 -114.1600       8.7       188       105        60
OIR    2025250     91400   19.5700 -114.1700       8.7       189       105        60
OIR    2025250     91400   19.5700 -114.1800       8.6       190       105        60
OIR    2025250     91400   19.5700 -114.1900       8.6       191       107        60
OIR    2025250     91400   19.5700 -114.2000       8.5       192       108        60
OIR    2025250     91400   19.5700 -114.2100       8.4       193       108        60
OIR    2025250     91400   19.5700 -114.2200       8.3       195       109        60
OIR    2025250     91400   19.5700 -114.2300       8.3       196       110        60
OIR    2025250     91400   19.5700 -114.2400       8.2       198       110        60
OIR    2025250     91400   19.5700 -114.2500       8.2       199       111        60
OIR    2025250     91400   19.5700 -114.2600       8.1       202       111        60
OIR    2025250     91400   19.5700 -114.2700       8.0       203       111        60
OIR    2025250     91400   19.5700 -114.2800       8.0       205       111        60
OIR    2025250     91400   19.5700 -114.2900       8.1       210       112        60
OIR    2025250     91400   19.5700 -114.3000       8.4       216       113        60
OIR    2025250     91400   19.5700 -114.3100       8.4       217       113        60
OIR    2025250     91400   19.5700 -114.3200       8.4       218       113        60
OIR    2025250     91400   19.5700 -114.3300       8.5       218       112        60
OIR    2025250     91400   19.5700 -114.3400       8.5       219       112        60
OIR    2025250     91400   19.5700 -114.3500       8.5       219       113        60
OIR    2025250     91400   19.5700 -114.3600       8.5       219       114        60
OIR    2025250     91400   19.5700 -114.3700       8.5       219       114        60
OIR    2025250     91400   19.5700 -114.3800       8.5       219       114        60
OIR    2025250     91400   19.5700 -114.3900       8.5       219       115        60
OIR    2025250     91400   19.5700 -114.4000       8.4       219       116        60
OIR    2025250     91400   19.5700 -114.4100       8.4       219       117        60
OIR    2025250     91400   19.5700 -114.4200       8.4       220       119        60
OIR    2025250     91400   19.5700 -114.4300       8.4       220       120        60
OIR    2025250     91400   19.5700 -114.4400       8.4       220       122        60
OIR    2025250     91400   19.5700 -114.4500       8.4       220       125        60
OIR    2025250     91400   19.5700 -114.4600       8.4       220       127        60
OIR    2025250     91400   19.5700 -114.4700       8.4       219       129        60
OIR    2025250     91400   19.5700 -114.4800       8.4       219       130        60
OIR    2025250     91400   19.5700 -114.4900       8.4       219       130        60
OIR    2025250     91400   19.5700 -114.5000       8.3       218       130        60
OIR    2025250     91400   19.5700 -114.5100       8.2       217       129        60
OIR    2025250     91400   19.5700 -114.5200       7.9       214       128        60
OIR    2025250     91400   19.5700 -114.5300       7.0       200       127        60
OIR    2025250     91400   19.5700 -114.5400       6.5       184       126        60
OIR    2025250     91400   19.5700 -114.5500       6.4       176       127        60
OIR    2025250     91400   19.5700 -114.5600       6.5       173       128        60
OIR    2025250     91400   19.5700 -114.5700       6.5       172       129        60
OIR    2025250     91400   19.5700 -114.5800       6.5       171       130        60
OIR    2025250     91400   19.5700 -114.5900       6.5       171       131        60
OIR    2025250     91400   19.5700 -114.6000       6.5       171       133        60
OIR    2025250     91400   19.5700 -114.6100       6.5       170       134        60
OIR    2025250     91400   19.5700 -114.6200       6.5       170       134        60
OIR    2025250     91400   19.5700 -114.6300       6.5       170       132        60
OIR    2025250     91400   19.5700 -114.6400       6.5       170       132        60
OIR    2025250     91400   19.5700 -114.6500       6.5       170       133        60
OIR    2025250     91400   19.5700 -114.6600       6.5       170       134        60
OIR    2025250     91400   19.5700 -114.6700       6.5       170       135        60
OIR    2025250     91400   19.5700 -114.6800       6.6       169       136        60
OIR    2025250     91400   19.5700 -114.6900       6.7       167       136        60
OIR    2025250     91400   19.5700 -114.7000       6.8       165       137        60
OIR    2025250     91400   19.5700 -114.7100       6.9       163       139        60
OIR    2025250     91400   19.5700 -114.7200       6.9       162       140        60
OIR    2025250     91400   19.5700 -115.8500      10.1       192       142        60
OIR    2025250     91400   19.5700 -115.8600      10.2       191       141        60
OIR    2025250     91400   19.5700 -115.8700      10.2       191       140        60
OIR    2025250     91400   19.5700 -115.8800      10.3       190       139        60
OIR    2025250     91400   19.5700 -115.8900      10.3       190       137        60
OIR    2025250     91400   19.5700 -115.9000      10.3       188       136        60
OIR    2025250     91400   19.5700 -115.9100      10.4       187       135        60
OIR    2025250     91400   19.5700 -115.9200      10.4       184       134        60
OIR    2025250     91400   19.5700 -115.9300      10.5       183       135        60
OIR    2025250     91400   19.5700 -115.9400      10.5       181       135        60
OIR    2025250     91400   19.5700 -115.9500      10.5       179       135        60
OIR    2025250     91400   19.5700 -115.9600      10.5       178       135        60
OIR    2025250     91400   19.5700 -115.9700      10.5       178       135        60
OIR    2025250     91400   19.5700 -115.9800      10.5       178       137        60
OIR    2025250     91400   19.5700 -115.9900      10.6       178       137        60
OIR    2025250     91400   19.5700 -116.0000      10.6       178       137        60
OIR    2025250     91400   19.5700 -116.0100      10.6       178       137        60
OIR    2025250     91400   19.5700 -116.0200      10.6       178       139        60
OIR    2025250     91400   19.5700 -116.0300      10.6       178       140        60
OIR    2025250     91400   19.5700 -116.2700       8.4       188       137        60
OIR    2025250     91400   19.5700 -116.2800       8.4       189       134        60
OIR    2025250     91400   19.5700 -116.2900       8.4       190       132        60
OIR    2025250     91400   19.5700 -116.3000       8.5       190       131        60
OIR    2025250     91400   19.5700 -116.3100       8.5       190       130        60
OIR    2025250     91400   19.5700 -116.3200       8.5       191       130        60
OIR    2025250     91400   19.5700 -116.3300       8.7       193       130        60
OIR    2025250     91400   19.5700 -116.3400       8.7       196       130        60
OIR    2025250     91400   19.5700 -116.3500       8.7       198       130        60
OIR    2025250     91400   19.5700 -116.3600       8.6       201       131        60
OIR    2025250     91400   19.5700 -116.3700       8.4       203       132        60
OIR    2025250     91400   19.5700 -116.3800       8.2       205       134        60
OIR    2025250     91400   19.5700 -116.3900       8.2       207       136        60
OIR    2025250     91400   19.5700 -116.4000       8.2       208       139        60
OIR    2025250     91400   19.5700 -116.4100       8.1       209       141        60
OIR    2025250     91400   19.5700 -117.9400       6.5        65       140        60
OIR    2025250     91400   19.5700 -117.9500       6.6        66       138        60
OIR    2025250     91400   19.5700 -117.9600       6.6        66       139        60
OIR    2025250     91400   19.5700 -117.9700       6.6        66       139        60
OIR    2025250     91400   19.5700 -117.9800       6.7        66       137        60
OIR    2025250     91400   19.5700 -117.9900       6.8        66       134        60
OIR    2025250     91400   19.5700 -118.0000       7.0        66       133        60
OIR    2025250     91400   19.5700 -118.0100       7.1        67       133        60
OIR    2025250     91400   19.5700 -118.0200       7.2        67       134        60
OIR    2025250     91400   19.5700 -118.0300       7.3        68       134        60
OIR    2025250     91400   19.5700 -118.0400       7.4        68       135        60
OIR    2025250     91400   19.5700 -118.0500       7.4        68       140        60
OIR    2025250     91400   19.5600 -112.8800       7.7       173       140        60
OIR    2025250     91400   19.5600 -112.8900       7.7       173       140        60
OIR    2025250     91400   19.5600 -112.9000       7.7       173       138        60
OIR    2025250     91400   19.5600 -112.9100       7.7       173       136        60
OIR    2025250     91400   19.5600 -112.9200       7.8       173       135        60
OIR    2025250     91400   19.5600 -112.9300       7.8       173       134        60
OIR    2025250     91400   19.5600 -112.9400       7.8       173       134        60
OIR    2025250     91400   19.5600 -112.9500       7.8       173       135        60
OIR    2025250     91400   19.5600 -112.9600       7.8       173       136        60
OIR    2025250     91400   19.5600 -112.9700       7.8       173       131        60
OIR    2025250     91400   19.5600 -112.9800       7.8       173       127        60
OIR    2025250     91400   19.5600 -112.9900       7.8       173       126        60
OIR    2025250     91400   19.5600 -113.0000       7.8       173       125        60
OIR    2025250     91400   19.5600 -113.0100       7.8       173       125        60
OIR    2025250     91400   19.5600 -113.0200       7.8       173       128        60
OIR    2025250     91400   19.5600 -113.0300       7.8       173       132        60
OIR    2025250     91400   19.5600 -113.0400       7.8       173       131        60
OIR    2025250     91400   19.5600 -113.0500       7.8       173       130        60
OIR    2025250     91400   19.5600 -113.0600       7.8       173       127        60
OIR    2025250     91400   19.5600 -113.0700       7.8       173       123        60
OIR    2025250     91400   19.5600 -113.0800       7.8       173       121        60
OIR    2025250     91400   19.5600 -113.0900       7.8       173       120        60
OIR    2025250     91400   19.5600 -113.1000       7.8       173       120        60
OIR    2025250     91400   19.5600 -113.1100       7.7       173       120        60
OIR    2025250     91400   19.5600 -113.1200       7.7       173       119        60
OIR    2025250     91400   19.5600 -113.1300       7.7       173       119        60
OIR    2025250     91400   19.5600 -113.1400       7.7       173       117        60
OIR    2025250     91400   19.5600 -113.1500       7.7       173       116        60
OIR    2025250     91400   19.5600 -113.1600       7.7       173       115        60
OIR    2025250     91400   19.5600 -113.1700       7.7       173       114        60
OIR    2025250     91400   19.5600 -113.1800       7.7       173       114        60
OIR    2025250     91400   19.5600 -113.1900       7.7       173       114        60
OIR    2025250     91400   19.5600 -113.2000       7.7       173       114        60
OIR    2025250     91400   19.5600 -113.2100       7.7       173       113        60
OIR    2025250     91400   19.5600 -113.2200       7.7       173       113        60
OIR    2025250     91400   19.5600 -113.2300       7.7       173       112        60
OIR    2025250     91400   19.5600 -113.2400       7.7       173       110        60
OIR    2025250     91400   19.5600 -113.2500       7.8       173       109        60
OIR    2025250     91400   19.5600 -113.2600       7.8       173       108        60
OIR    2025250     91400   19.5600 -113.2700       7.8       173       108        60
OIR    2025250     91400   19.5600 -113.2800       7.8       173       107        60
OIR    2025250     91400   19.5600 -113.2900       7.8       173       107        60
OIR    2025250     91400   19.5600 -113.3000       7.8       173       105        60
OIR    2025250     91400   19.5600 -113.3100       7.8       173       104        60
OIR    2025250     91400   19.5600 -113.3200       7.9       173       104        60
OIR    2025250     91400   19.5600 -113.3300       7.9       173       104        60
OIR    2025250     91400   19.5600 -113.3400       7.9       173       104        60
OIR    2025250     91400   19.5600 -113.3500       7.9       173       104        60
OIR    2025250     91400   19.5600 -113.3600       8.0       173       104        60
OIR    2025250     91400   19.5600 -113.3700       8.0       173       104        60
OIR    2025250     91400   19.5600 -113.3800       8.0       173       103        60
OIR    2025250     91400   19.5600 -113.3900       8.0       173       103        60
OIR    2025250     91400   19.5600 -113.4000       8.1       173       103        60
OIR    2025250     91400   19.5600 -113.4100       8.1       173       103        60
OIR    2025250     91400   19.5600 -113.4200       8.1       173       103        60
OIR    2025250     91400   19.5600 -113.4300       8.2       173       103        60
OIR    2025250     91400   19.5600 -113.4400       8.2       173       103        60
OIR    2025250     91400   19.5600 -113.4500       8.2       173       103        60
OIR    2025250     91400   19.5600 -113.4600       8.3       173       103        60
OIR    2025250     91400   19.5600 -113.4700       8.3       174       103        60
OIR    2025250     91400   19.5600 -113.4800       8.4       174       103        60
OIR    2025250     91400   19.5600 -113.4900       8.4       174       103        60
OIR    2025250     91400   19.5600 -113.5000       8.5       174       103        60
OIR    2025250     91400   19.5600 -113.5100       8.5       174       103        60
OIR    2025250     91400   19.5600 -113.5200       8.5       174       103        60
OIR    2025250     91400   19.5600 -113.5300       8.6       175       103        60
OIR    2025250     91400   19.5600 -113.5400       8.6       175       103        60
OIR    2025250     91400   19.5600 -113.5500       8.6       175       103        60
OIR    2025250     91400   19.5600 -113.5600       8.7       175       103        60
OIR    2025250     91400   19.5600 -113.5700       8.7       175       103        60
OIR    2025250     91400   19.5600 -113.5800       8.7       175       103        60
OIR    2025250     91400   19.5600 -113.5900       8.7       175       103        60
OIR    2025250     91400   19.5600 -113.6000       8.7       176       103        60
OIR    2025250     91400   19.5600 -113.6100       8.7       176       103        60
OIR    2025250     91400   19.5600 -113.6200       8.7       176       103        60
OIR    2025250     91400   19.5600 -113.6300       8.8       176       103        60
OIR    2025250     91400   19.5600 -113.6400       8.8       176       103        60
OIR    2025250     91400   19.5600 -113.6500       8.8       176       103        60
OIR    2025250     91400   19.5600 -113.6600       8.8       176       103        60
OIR    2025250     91400   19.5600 -113.6700       8.8       176       103        60
OIR    2025250     91400   19.5600 -113.6800       8.8       176       103        60
OIR    2025250     91400   19.5600 -113.6900       8.8       176       103        60
OIR    2025250     91400   19.5600 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.5600 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.5600 -113.7200       8.9       177       103        60
OIR    2025250     91400   19.5600 -113.7300       8.9       177       103        60
OIR    2025250     91400   19.5600 -113.7400       8.9       177       103        60
OIR    2025250     91400   19.5600 -113.7500       8.9       177       103        60
OIR    2025250     91400   19.5600 -113.7600       8.9       177       104        60
OIR    2025250     91400   19.5600 -113.7700       9.0       177       104        60
OIR    2025250     91400   19.5600 -113.7800       9.0       177       104        60
OIR    2025250     91400   19.5600 -113.7900       9.0       178       105        60
OIR    2025250     91400   19.5600 -113.8000       9.0       178       105        60
OIR    2025250     91400   19.5600 -113.8100       9.0       178       105        60
OIR    2025250     91400   19.5600 -113.8200       9.0       178       104        60
OIR    2025250     91400   19.5600 -113.8300       9.0       178       104        60
OIR    2025250     91400   19.5600 -113.8400       9.1       178       104        60
OIR    2025250     91400   19.5600 -113.8500       9.1       179       104        60
OIR    2025250     91400   19.5600 -113.8600       9.1       179       105        60
OIR    2025250     91400   19.5600 -113.8700       9.1       179       104        60
OIR    2025250     91400   19.5600 -113.8800       9.1       179       104        60
OIR    2025250     91400   19.5600 -113.8900       9.1       179       104        60
OIR    2025250     91400   19.5600 -113.9000       9.1       179       104        60
OIR    2025250     91400   19.5600 -113.9100       9.1       180       104        60
OIR    2025250     91400   19.5600 -113.9200       9.1       180       104        60
OIR    2025250     91400   19.5600 -113.9300       9.2       180       104        60
OIR    2025250     91400   19.5600 -113.9400       9.2       180       104        60
OIR    2025250     91400   19.5600 -113.9500       9.2       180       104        60
OIR    2025250     91400   19.5600 -113.9600       9.2       180       104        60
OIR    2025250     91400   19.5600 -113.9700       9.2       181       104        60
OIR    2025250     91400   19.5600 -113.9800       9.2       181       104        60
OIR    2025250     91400   19.5600 -113.9900       9.2       181       104        60
OIR    2025250     91400   19.5600 -114.0000       9.2       181       104        60
OIR    2025250     91400   19.5600 -114.0100       9.2       182       104        60
OIR    2025250     91400   19.5600 -114.0200       9.2       182       105        60
OIR    2025250     91400   19.5600 -114.0300       9.2       182       104        60
OIR    2025250     91400   19.5600 -114.0400       9.1       183       104        60
OIR    2025250     91400   19.5600 -114.0500       9.1       183       104        60
OIR    2025250     91400   19.5600 -114.0600       9.1       184       104        60
OIR    2025250     91400   19.5600 -114.0700       9.1       184       104        60
OIR    2025250     91400   19.5600 -114.0800       9.1       184       104        60
OIR    2025250     91400   19.5600 -114.0900       9.1       185       104        60
OIR    2025250     91400   19.5600 -114.1000       9.0       185       104        60
OIR    2025250     91400   19.5600 -114.1100       9.0       185       104        60
OIR    2025250     91400   19.5600 -114.1200       9.0       186       104        60
OIR    2025250     91400   19.5600 -114.1300       9.0       186       104        60
OIR    2025250     91400   19.5600 -114.1400       8.9       187       104        60
OIR    2025250     91400   19.5600 -114.1500       8.9       187       105        60
OIR    2025250     91400   19.5600 -114.1600       8.8       188       105        60
OIR    2025250     91400   19.5600 -114.1700       8.7       189       105        60
OIR    2025250     91400   19.5600 -114.1800       8.6       190       105        60
OIR    2025250     91400   19.5600 -114.1900       8.6       191       107        60
OIR    2025250     91400   19.5600 -114.2000       8.5       192       108        60
OIR    2025250     91400   19.5600 -114.2100       8.4       193       108        60
OIR    2025250     91400   19.5600 -114.2200       8.3       195       108        60
OIR    2025250     91400   19.5600 -114.2300       8.3       196       109        60
OIR    2025250     91400   19.5600 -114.2400       8.2       198       110        60
OIR    2025250     91400   19.5600 -114.2500       8.1       200       111        60
OIR    2025250     91400   19.5600 -114.2600       8.1       202       111        60
OIR    2025250     91400   19.5600 -114.2700       8.0       204       111        60
OIR    2025250     91400   19.5600 -114.2800       8.0       206       112        60
OIR    2025250     91400   19.5600 -114.2900       8.2       211       112        60
OIR    2025250     91400   19.5600 -114.3000       8.4       216       113        60
OIR    2025250     91400   19.5600 -114.3100       8.4       217       113        60
OIR    2025250     91400   19.5600 -114.3200       8.4       218       113        60
OIR    2025250     91400   19.5600 -114.3300       8.4       218       112        60
OIR    2025250     91400   19.5600 -114.3400       8.5       218       111        60
OIR    2025250     91400   19.5600 -114.3500       8.5       219       112        60
OIR    2025250     91400   19.5600 -114.3600       8.5       219       114        60
OIR    2025250     91400   19.5600 -114.3700       8.5       219       114        60
OIR    2025250     91400   19.5600 -114.3800       8.4       219       114        60
OIR    2025250     91400   19.5600 -114.3900       8.4       219       115        60
OIR    2025250     91400   19.5600 -114.4000       8.4       219       116        60
OIR    2025250     91400   19.5600 -114.4100       8.4       220       119        60
OIR    2025250     91400   19.5600 -114.4200       8.4       220       117        60
OIR    2025250     91400   19.5600 -114.4300       8.4       220       117        60
OIR    2025250     91400   19.5600 -114.4400       8.4       220       122        60
OIR    2025250     91400   19.5600 -114.4500       8.4       220       127        60
OIR    2025250     91400   19.5600 -114.4600       8.4       220       129        60
OIR    2025250     91400   19.5600 -114.4700       8.4       220       130        60
OIR    2025250     91400   19.5600 -114.4800       8.4       219       130        60
OIR    2025250     91400   19.5600 -114.4900       8.4       219       130        60
OIR    2025250     91400   19.5600 -114.5000       8.3       218       130        60
OIR    2025250     91400   19.5600 -114.5100       8.1       216       129        60
OIR    2025250     91400   19.5600 -114.5200       7.7       211       129        60
OIR    2025250     91400   19.5600 -114.5300       7.0       199       127        60
OIR    2025250     91400   19.5600 -114.5400       6.6       185       125        60
OIR    2025250     91400   19.5600 -114.5500       6.5       177       125        60
OIR    2025250     91400   19.5600 -114.5600       6.5       173       127        60
OIR    2025250     91400   19.5600 -114.5700       6.5       172       129        60
OIR    2025250     91400   19.5600 -114.5800       6.5       171       129        60
OIR    2025250     91400   19.5600 -114.5900       6.5       171       130        60
OIR    2025250     91400   19.5600 -114.6000       6.5       171       131        60
OIR    2025250     91400   19.5600 -114.6100       6.5       170       132        60
OIR    2025250     91400   19.5600 -114.6200       6.5       170       133        60
OIR    2025250     91400   19.5600 -114.6300       6.5       170       134        60
OIR    2025250     91400   19.5600 -114.6400       6.5       170       135        60
OIR    2025250     91400   19.5600 -114.6500       6.6       170       135        60
OIR    2025250     91400   19.5600 -114.6600       6.6       170       136        60
OIR    2025250     91400   19.5600 -114.6700       6.6       169       136        60
OIR    2025250     91400   19.5600 -114.6800       6.6       168       137        60
OIR    2025250     91400   19.5600 -114.6900       6.8       166       137        60
OIR    2025250     91400   19.5600 -114.7000       6.9       165       137        60
OIR    2025250     91400   19.5600 -114.7100       7.0       163       138        60
OIR    2025250     91400   19.5600 -114.7200       7.1       162       139        60
OIR    2025250     91400   19.5600 -115.8900      10.3       190       139        60
OIR    2025250     91400   19.5600 -115.9000      10.3       189       136        60
OIR    2025250     91400   19.5600 -115.9100      10.4       187       135        60
OIR    2025250     91400   19.5600 -115.9200      10.4       185       135        60
OIR    2025250     91400   19.5600 -115.9300      10.5       183       136        60
OIR    2025250     91400   19.5600 -115.9400      10.5       181       138        60
OIR    2025250     91400   19.5600 -115.9500      10.5       179       137        60
OIR    2025250     91400   19.5600 -115.9600      10.5       179       136        60
OIR    2025250     91400   19.5600 -115.9700      10.5       178       137        60
OIR    2025250     91400   19.5600 -115.9800      10.5       178       139        60
OIR    2025250     91400   19.5600 -115.9900      10.5       178       140        60
OIR    2025250     91400   19.5600 -116.0000      10.5       178       139        60
OIR    2025250     91400   19.5600 -116.0100      10.6       178       138        60
OIR    2025250     91400   19.5600 -116.0200      10.6       178       141        60
OIR    2025250     91400   19.5600 -116.2600       8.5       189       140        60
OIR    2025250     91400   19.5600 -116.2700       8.5       189       136        60
OIR    2025250     91400   19.5600 -116.2800       8.5       190       133        60
OIR    2025250     91400   19.5600 -116.2900       8.5       190       131        60
OIR    2025250     91400   19.5600 -116.3000       8.5       190       130        60
OIR    2025250     91400   19.5600 -116.3100       8.5       190       129        60
OIR    2025250     91400   19.5600 -116.3200       8.5       191       129        60
OIR    2025250     91400   19.5600 -116.3300       8.5       192       129        60
OIR    2025250     91400   19.5600 -116.3400       8.4       194       129        60
OIR    2025250     91400   19.5600 -116.3500       8.4       198       130        60
OIR    2025250     91400   19.5600 -116.3600       8.2       201       129        60
OIR    2025250     91400   19.5600 -116.3700       7.9       204       130        60
OIR    2025250     91400   19.5600 -116.3800       7.8       206       131        60
OIR    2025250     91400   19.5600 -116.3900       7.7       207       133        60
OIR    2025250     91400   19.5600 -116.4000       7.6       209       138        60
OIR    2025250     91400   19.5600 -117.9500       6.6        67       141        60
OIR    2025250     91400   19.5600 -117.9600       6.6        66       141        60
OIR    2025250     91400   19.5600 -117.9700       6.6        66       142        60
OIR    2025250     91400   19.5600 -117.9800       6.7        66       141        60
OIR    2025250     91400   19.5600 -117.9900       6.7        67       137        60
OIR    2025250     91400   19.5600 -118.0000       6.8        67       135        60
OIR    2025250     91400   19.5600 -118.0100       7.0        67       135        60
OIR    2025250     91400   19.5600 -118.0200       7.1        67       135        60
OIR    2025250     91400   19.5600 -118.0300       7.3        68       134        60
OIR    2025250     91400   19.5600 -118.0400       7.4        68       133        60
OIR    2025250     91400   19.5600 -118.0500       7.4        68       136        60
OIR    2025250     91400   19.5600 -118.0600       7.4        68       139        60
OIR    2025250     91400   19.5600 -118.0700       7.5        69       142        60
OIR    2025250     91400   19.5500 -112.8800       7.7       173       141        60
OIR    2025250     91400   19.5500 -112.8900       7.7       173       139        60
OIR    2025250     91400   19.5500 -112.9000       7.7       173       137        60
OIR    2025250     91400   19.5500 -112.9100       7.7       173       135        60
OIR    2025250     91400   19.5500 -112.9200       7.8       173       134        60
OIR    2025250     91400   19.5500 -112.9300       7.8       173       134        60
OIR    2025250     91400   19.5500 -112.9400       7.8       173       133        60
OIR    2025250     91400   19.5500 -112.9500       7.8       173       134        60
OIR    2025250     91400   19.5500 -112.9600       7.8       173       135        60
OIR    2025250     91400   19.5500 -112.9700       7.8       173       134        60
OIR    2025250     91400   19.5500 -112.9800       7.8       173       131        60
OIR    2025250     91400   19.5500 -112.9900       7.8       173       130        60
OIR    2025250     91400   19.5500 -113.0000       7.8       173       129        60
OIR    2025250     91400   19.5500 -113.0100       7.8       173       128        60
OIR    2025250     91400   19.5500 -113.0200       7.8       173       128        60
OIR    2025250     91400   19.5500 -113.0300       7.8       173       128        60
OIR    2025250     91400   19.5500 -113.0400       7.8       173       128        60
OIR    2025250     91400   19.5500 -113.0500       7.8       173       127        60
OIR    2025250     91400   19.5500 -113.0600       7.8       173       125        60
OIR    2025250     91400   19.5500 -113.0700       7.8       173       124        60
OIR    2025250     91400   19.5500 -113.0800       7.8       173       122        60
OIR    2025250     91400   19.5500 -113.0900       7.8       173       121        60
OIR    2025250     91400   19.5500 -113.1000       7.8       173       121        60
OIR    2025250     91400   19.5500 -113.1100       7.7       173       120        60
OIR    2025250     91400   19.5500 -113.1200       7.7       173       120        60
OIR    2025250     91400   19.5500 -113.1300       7.7       173       119        60
OIR    2025250     91400   19.5500 -113.1400       7.7       173       117        60
OIR    2025250     91400   19.5500 -113.1500       7.7       173       116        60
OIR    2025250     91400   19.5500 -113.1600       7.7       173       116        60
OIR    2025250     91400   19.5500 -113.1700       7.7       173       115        60
OIR    2025250     91400   19.5500 -113.1800       7.7       173       114        60
OIR    2025250     91400   19.5500 -113.1900       7.7       173       113        60
OIR    2025250     91400   19.5500 -113.2000       7.7       173       113        60
OIR    2025250     91400   19.5500 -113.2100       7.7       173       113        60
OIR    2025250     91400   19.5500 -113.2200       7.7       173       113        60
OIR    2025250     91400   19.5500 -113.2300       7.7       173       111        60
OIR    2025250     91400   19.5500 -113.2400       7.7       173       110        60
OIR    2025250     91400   19.5500 -113.2500       7.8       173       109        60
OIR    2025250     91400   19.5500 -113.2600       7.8       173       109        60
OIR    2025250     91400   19.5500 -113.2700       7.8       173       108        60
OIR    2025250     91400   19.5500 -113.2800       7.8       173       107        60
OIR    2025250     91400   19.5500 -113.2900       7.8       173       107        60
OIR    2025250     91400   19.5500 -113.3000       7.8       173       105        60
OIR    2025250     91400   19.5500 -113.3100       7.8       173       104        60
OIR    2025250     91400   19.5500 -113.3200       7.9       173       104        60
OIR    2025250     91400   19.5500 -113.3300       7.9       173       103        60
OIR    2025250     91400   19.5500 -113.3400       7.9       173       103        60
OIR    2025250     91400   19.5500 -113.3500       7.9       173       104        60
OIR    2025250     91400   19.5500 -113.3600       8.0       173       104        60
OIR    2025250     91400   19.5500 -113.3700       8.0       173       104        60
OIR    2025250     91400   19.5500 -113.3800       8.0       173       104        60
OIR    2025250     91400   19.5500 -113.3900       8.0       173       103        60
OIR    2025250     91400   19.5500 -113.4000       8.1       173       103        60
OIR    2025250     91400   19.5500 -113.4100       8.1       173       103        60
OIR    2025250     91400   19.5500 -113.4200       8.1       173       103        60
OIR    2025250     91400   19.5500 -113.4300       8.2       173       103        60
OIR    2025250     91400   19.5500 -113.4400       8.2       173       103        60
OIR    2025250     91400   19.5500 -113.4500       8.3       174       103        60
OIR    2025250     91400   19.5500 -113.4600       8.3       174       103        60
OIR    2025250     91400   19.5500 -113.4700       8.3       174       103        60
OIR    2025250     91400   19.5500 -113.4800       8.4       174       103        60
OIR    2025250     91400   19.5500 -113.4900       8.4       174       103        60
OIR    2025250     91400   19.5500 -113.5000       8.5       174       103        60
OIR    2025250     91400   19.5500 -113.5100       8.5       174       103        60
OIR    2025250     91400   19.5500 -113.5200       8.5       175       103        60
OIR    2025250     91400   19.5500 -113.5300       8.6       175       103        60
OIR    2025250     91400   19.5500 -113.5400       8.6       175       103        60
OIR    2025250     91400   19.5500 -113.5500       8.6       175       103        60
OIR    2025250     91400   19.5500 -113.5600       8.7       175       103        60
OIR    2025250     91400   19.5500 -113.5700       8.7       175       103        60
OIR    2025250     91400   19.5500 -113.5800       8.7       175       103        60
OIR    2025250     91400   19.5500 -113.5900       8.7       176       103        60
OIR    2025250     91400   19.5500 -113.6000       8.7       176       103        60
OIR    2025250     91400   19.5500 -113.6100       8.7       176       103        60
OIR    2025250     91400   19.5500 -113.6200       8.7       176       103        60
OIR    2025250     91400   19.5500 -113.6300       8.8       176       103        60
OIR    2025250     91400   19.5500 -113.6400       8.8       176       103        60
OIR    2025250     91400   19.5500 -113.6500       8.8       176       103        60
OIR    2025250     91400   19.5500 -113.6600       8.8       176       103        60
OIR    2025250     91400   19.5500 -113.6700       8.8       176       103        60
OIR    2025250     91400   19.5500 -113.6800       8.8       176       103        60
OIR    2025250     91400   19.5500 -113.6900       8.8       177       103        60
OIR    2025250     91400   19.5500 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.5500 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.5500 -113.7200       8.9       177       103        60
OIR    2025250     91400   19.5500 -113.7300       8.9       177       103        60
OIR    2025250     91400   19.5500 -113.7400       8.9       177       103        60
OIR    2025250     91400   19.5500 -113.7500       8.9       177       104        60
OIR    2025250     91400   19.5500 -113.7600       9.0       177       104        60
OIR    2025250     91400   19.5500 -113.7700       9.0       177       104        60
OIR    2025250     91400   19.5500 -113.7800       9.0       178       104        60
OIR    2025250     91400   19.5500 -113.7900       9.0       178       105        60
OIR    2025250     91400   19.5500 -113.8000       9.0       178       105        60
OIR    2025250     91400   19.5500 -113.8100       9.0       178       105        60
OIR    2025250     91400   19.5500 -113.8200       9.0       178       104        60
OIR    2025250     91400   19.5500 -113.8300       9.1       178       104        60
OIR    2025250     91400   19.5500 -113.8400       9.1       179       104        60
OIR    2025250     91400   19.5500 -113.8500       9.1       179       104        60
OIR    2025250     91400   19.5500 -113.8600       9.1       179       105        60
OIR    2025250     91400   19.5500 -113.8700       9.1       179       104        60
OIR    2025250     91400   19.5500 -113.8800       9.1       179       104        60
OIR    2025250     91400   19.5500 -113.8900       9.1       179       104        60
OIR    2025250     91400   19.5500 -113.9000       9.1       180       104        60
OIR    2025250     91400   19.5500 -113.9100       9.1       180       104        60
OIR    2025250     91400   19.5500 -113.9200       9.1       180       104        60
OIR    2025250     91400   19.5500 -113.9300       9.2       180       104        60
OIR    2025250     91400   19.5500 -113.9400       9.2       180       104        60
OIR    2025250     91400   19.5500 -113.9500       9.2       180       105        60
OIR    2025250     91400   19.5500 -113.9600       9.2       181       105        60
OIR    2025250     91400   19.5500 -113.9700       9.2       181       105        60
OIR    2025250     91400   19.5500 -113.9800       9.2       181       104        60
OIR    2025250     91400   19.5500 -113.9900       9.2       181       104        60
OIR    2025250     91400   19.5500 -114.0000       9.2       181       104        60
OIR    2025250     91400   19.5500 -114.0100       9.2       182       104        60
OIR    2025250     91400   19.5500 -114.0200       9.2       182       105        60
OIR    2025250     91400   19.5500 -114.0300       9.2       182       105        60
OIR    2025250     91400   19.5500 -114.0400       9.2       183       104        60
OIR    2025250     91400   19.5500 -114.0500       9.2       183       104        60
OIR    2025250     91400   19.5500 -114.0600       9.1       184       104        60
OIR    2025250     91400   19.5500 -114.0700       9.1       184       104        60
OIR    2025250     91400   19.5500 -114.0800       9.1       184       105        60
OIR    2025250     91400   19.5500 -114.0900       9.1       185       107        60
OIR    2025250     91400   19.5500 -114.1000       9.1       185       105        60
OIR    2025250     91400   19.5500 -114.1100       9.1       185       104        60
OIR    2025250     91400   19.5500 -114.1200       9.0       186       104        60
OIR    2025250     91400   19.5500 -114.1300       9.0       186       104        60
OIR    2025250     91400   19.5500 -114.1400       9.0       187       104        60
OIR    2025250     91400   19.5500 -114.1500       8.9       187       104        60
OIR    2025250     91400   19.5500 -114.1600       8.9       188       105        60
OIR    2025250     91400   19.5500 -114.1700       8.8       189       105        60
OIR    2025250     91400   19.5500 -114.1800       8.7       189       105        60
OIR    2025250     91400   19.5500 -114.1900       8.6       190       107        60
OIR    2025250     91400   19.5500 -114.2000       8.6       191       108        60
OIR    2025250     91400   19.5500 -114.2100       8.5       193       108        60
OIR    2025250     91400   19.5500 -114.2200       8.4       195       108        60
OIR    2025250     91400   19.5500 -114.2300       8.3       196       108        60
OIR    2025250     91400   19.5500 -114.2400       8.2       198       109        60
OIR    2025250     91400   19.5500 -114.2500       8.1       200       109        60
OIR    2025250     91400   19.5500 -114.2600       8.0       203       110        60
OIR    2025250     91400   19.5500 -114.2700       8.0       204       111        60
OIR    2025250     91400   19.5500 -114.2800       8.0       206       112        60
OIR    2025250     91400   19.5500 -114.2900       8.2       212       112        60
OIR    2025250     91400   19.5500 -114.3000       8.4       216       112        60
OIR    2025250     91400   19.5500 -114.3100       8.4       217       112        60
OIR    2025250     91400   19.5500 -114.3200       8.4       218       112        60
OIR    2025250     91400   19.5500 -114.3300       8.4       218       112        60
OIR    2025250     91400   19.5500 -114.3400       8.4       218       111        60
OIR    2025250     91400   19.5500 -114.3500       8.4       219       112        60
OIR    2025250     91400   19.5500 -114.3600       8.4       219       114        60
OIR    2025250     91400   19.5500 -114.3700       8.4       219       115        60
OIR    2025250     91400   19.5500 -114.3800       8.4       219       115        60
OIR    2025250     91400   19.5500 -114.3900       8.4       219       116        60
OIR    2025250     91400   19.5500 -114.4000       8.4       219       116        60
OIR    2025250     91400   19.5500 -114.4100       8.4       220       117        60
OIR    2025250     91400   19.5500 -114.4200       8.4       220       119        60
OIR    2025250     91400   19.5500 -114.4300       8.4       220       120        60
OIR    2025250     91400   19.5500 -114.4400       8.4       220       123        60
OIR    2025250     91400   19.5500 -114.4500       8.4       220       127        60
OIR    2025250     91400   19.5500 -114.4600       8.4       220       130        60
OIR    2025250     91400   19.5500 -114.4700       8.4       220       130        60
OIR    2025250     91400   19.5500 -114.4800       8.4       219       130        60
OIR    2025250     91400   19.5500 -114.4900       8.3       219       129        60
OIR    2025250     91400   19.5500 -114.5000       8.2       217       128        60
OIR    2025250     91400   19.5500 -114.5100       8.0       215       128        60
OIR    2025250     91400   19.5500 -114.5200       7.6       209       129        60
OIR    2025250     91400   19.5500 -114.5300       7.0       198       128        60
OIR    2025250     91400   19.5500 -114.5400       6.6       186       126        60
OIR    2025250     91400   19.5500 -114.5500       6.5       178       124        60
OIR    2025250     91400   19.5500 -114.5600       6.5       174       127        60
OIR    2025250     91400   19.5500 -114.5700       6.5       172       130        60
OIR    2025250     91400   19.5500 -114.5800       6.5       171       130        60
OIR    2025250     91400   19.5500 -114.5900       6.5       171       129        60
OIR    2025250     91400   19.5500 -114.6000       6.6       171       130        60
OIR    2025250     91400   19.5500 -114.6100       6.6       170       131        60
OIR    2025250     91400   19.5500 -114.6200       6.6       170       133        60
OIR    2025250     91400   19.5500 -114.6300       6.6       170       135        60
OIR    2025250     91400   19.5500 -114.6400       6.6       170       137        60
OIR    2025250     91400   19.5500 -114.6500       6.6       169       138        60
OIR    2025250     91400   19.5500 -114.6600       6.6       169       138        60
OIR    2025250     91400   19.5500 -114.6700       6.6       169       138        60
OIR    2025250     91400   19.5500 -114.6800       6.7       168       138        60
OIR    2025250     91400   19.5500 -114.6900       6.9       165       138        60
OIR    2025250     91400   19.5500 -114.7000       7.0       164       138        60
OIR    2025250     91400   19.5500 -114.7100       7.1       163       138        60
OIR    2025250     91400   19.5500 -114.7200       7.2       162       139        60
OIR    2025250     91400   19.5500 -114.7300       7.4       159       140        60
OIR    2025250     91400   19.5500 -115.8900      10.3       191       142        60
OIR    2025250     91400   19.5500 -115.9000      10.3       190       138        60
OIR    2025250     91400   19.5500 -115.9100      10.4       188       137        60
OIR    2025250     91400   19.5500 -115.9200      10.4       185       136        60
OIR    2025250     91400   19.5500 -115.9300      10.5       183       137        60
OIR    2025250     91400   19.5500 -115.9400      10.5       182       139        60
OIR    2025250     91400   19.5500 -115.9500      10.5       180       138        60
OIR    2025250     91400   19.5500 -115.9600      10.5       179       137        60
OIR    2025250     91400   19.5500 -115.9700      10.5       178       137        60
OIR    2025250     91400   19.5500 -115.9800      10.5       178       141        60
OIR    2025250     91400   19.5500 -115.9900      10.5       178       143        60
OIR    2025250     91400   19.5500 -116.0000      10.5       178       142        60
OIR    2025250     91400   19.5500 -116.0100      10.5       178       140        60
OIR    2025250     91400   19.5500 -116.0200      10.5       178       142        60
OIR    2025250     91400   19.5500 -116.2400       8.7       189       139        60
OIR    2025250     91400   19.5500 -116.2500       8.6       189       137        60
OIR    2025250     91400   19.5500 -116.2600       8.6       189       135        60
OIR    2025250     91400   19.5500 -116.2700       8.5       190       133        60
OIR    2025250     91400   19.5500 -116.2800       8.5       190       132        60
OIR    2025250     91400   19.5500 -116.2900       8.5       190       130        60
OIR    2025250     91400   19.5500 -116.3000       8.5       190       129        60
OIR    2025250     91400   19.5500 -116.3100       8.5       190       128        60
OIR    2025250     91400   19.5500 -116.3200       8.5       191       128        60
OIR    2025250     91400   19.5500 -116.3300       8.4       192       128        60
OIR    2025250     91400   19.5500 -116.3400       8.2       194       129        60
OIR    2025250     91400   19.5500 -116.3500       8.0       198       129        60
OIR    2025250     91400   19.5500 -116.3600       7.7       201       129        60
OIR    2025250     91400   19.5500 -116.3700       7.6       204       129        60
OIR    2025250     91400   19.5500 -116.3800       7.5       206       131        60
OIR    2025250     91400   19.5500 -116.3900       7.4       207       133        60
OIR    2025250     91400   19.5500 -116.4000       7.4       209       135        60
OIR    2025250     91400   19.5500 -116.4100       7.4       210       138        60
OIR    2025250     91400   19.5500 -116.4200       7.5       211       141        60
OIR    2025250     91400   19.5500 -117.9600       6.6        67       142        60
OIR    2025250     91400   19.5500 -117.9700       6.6        67       142        60
OIR    2025250     91400   19.5500 -117.9800       6.6        67       141        60
OIR    2025250     91400   19.5500 -117.9900       6.7        67       140        60
OIR    2025250     91400   19.5500 -118.0000       6.7        67       138        60
OIR    2025250     91400   19.5500 -118.0100       6.8        67       137        60
OIR    2025250     91400   19.5500 -118.0200       6.9        67       136        60
OIR    2025250     91400   19.5500 -118.0300       7.2        68       135        60
OIR    2025250     91400   19.5500 -118.0400       7.3        68       134        60
OIR    2025250     91400   19.5500 -118.0500       7.4        68       136        60
OIR    2025250     91400   19.5500 -118.0600       7.4        68       138        60
OIR    2025250     91400   19.5500 -118.0700       7.5        69       140        60
OIR    2025250     91400   19.5500 -118.0800       7.9        70       142        60
OIR    2025250     91400   19.5400 -112.8800       7.7       173       141        60
OIR    2025250     91400   19.5400 -112.8900       7.7       173       140        60
OIR    2025250     91400   19.5400 -112.9000       7.7       173       138        60
OIR    2025250     91400   19.5400 -112.9100       7.8       173       135        60
OIR    2025250     91400   19.5400 -112.9200       7.8       173       133        60
OIR    2025250     91400   19.5400 -112.9300       7.8       173       133        60
OIR    2025250     91400   19.5400 -112.9400       7.8       173       133        60
OIR    2025250     91400   19.5400 -112.9500       7.8       173       133        60
OIR    2025250     91400   19.5400 -112.9600       7.8       173       134        60
OIR    2025250     91400   19.5400 -112.9700       7.8       173       134        60
OIR    2025250     91400   19.5400 -112.9800       7.8       173       134        60
OIR    2025250     91400   19.5400 -112.9900       7.8       173       134        60
OIR    2025250     91400   19.5400 -113.0000       7.8       173       133        60
OIR    2025250     91400   19.5400 -113.0100       7.8       173       132        60
OIR    2025250     91400   19.5400 -113.0200       7.8       173       129        60
OIR    2025250     91400   19.5400 -113.0300       7.8       173       126        60
OIR    2025250     91400   19.5400 -113.0400       7.8       173       124        60
OIR    2025250     91400   19.5400 -113.0500       7.8       173       123        60
OIR    2025250     91400   19.5400 -113.0600       7.8       173       122        60
OIR    2025250     91400   19.5400 -113.0700       7.8       173       123        60
OIR    2025250     91400   19.5400 -113.0800       7.8       173       123        60
OIR    2025250     91400   19.5400 -113.0900       7.8       173       122        60
OIR    2025250     91400   19.5400 -113.1000       7.7       173       121        60
OIR    2025250     91400   19.5400 -113.1100       7.7       173       121        60
OIR    2025250     91400   19.5400 -113.1200       7.7       173       121        60
OIR    2025250     91400   19.5400 -113.1300       7.7       173       121        60
OIR    2025250     91400   19.5400 -113.1400       7.7       173       119        60
OIR    2025250     91400   19.5400 -113.1500       7.7       173       116        60
OIR    2025250     91400   19.5400 -113.1600       7.7       174       116        60
OIR    2025250     91400   19.5400 -113.1700       7.7       174       115        60
OIR    2025250     91400   19.5400 -113.1800       7.7       174       115        60
OIR    2025250     91400   19.5400 -113.1900       7.7       174       116        60
OIR    2025250     91400   19.5400 -113.2000       7.7       173       115        60
OIR    2025250     91400   19.5400 -113.2100       7.7       173       114        60
OIR    2025250     91400   19.5400 -113.2200       7.7       173       113        60
OIR    2025250     91400   19.5400 -113.2300       7.7       173       112        60
OIR    2025250     91400   19.5400 -113.2400       7.7       173       111        60
OIR    2025250     91400   19.5400 -113.2500       7.8       173       110        60
OIR    2025250     91400   19.5400 -113.2600       7.8       173       109        60
OIR    2025250     91400   19.5400 -113.2700       7.8       173       108        60
OIR    2025250     91400   19.5400 -113.2800       7.8       173       107        60
OIR    2025250     91400   19.5400 -113.2900       7.8       173       105        60
OIR    2025250     91400   19.5400 -113.3000       7.8       173       105        60
OIR    2025250     91400   19.5400 -113.3100       7.8       173       104        60
OIR    2025250     91400   19.5400 -113.3200       7.9       173       104        60
OIR    2025250     91400   19.5400 -113.3300       7.9       173       104        60
OIR    2025250     91400   19.5400 -113.3400       7.9       173       104        60
OIR    2025250     91400   19.5400 -113.3500       7.9       173       104        60
OIR    2025250     91400   19.5400 -113.3600       8.0       173       104        60
OIR    2025250     91400   19.5400 -113.3700       8.0       173       104        60
OIR    2025250     91400   19.5400 -113.3800       8.0       173       104        60
OIR    2025250     91400   19.5400 -113.3900       8.0       173       104        60
OIR    2025250     91400   19.5400 -113.4000       8.1       173       103        60
OIR    2025250     91400   19.5400 -113.4100       8.1       173       103        60
OIR    2025250     91400   19.5400 -113.4200       8.1       173       103        60
OIR    2025250     91400   19.5400 -113.4300       8.2       174       103        60
OIR    2025250     91400   19.5400 -113.4400       8.2       174       103        60
OIR    2025250     91400   19.5400 -113.4500       8.3       174       103        60
OIR    2025250     91400   19.5400 -113.4600       8.3       174       103        60
OIR    2025250     91400   19.5400 -113.4700       8.3       174       103        60
OIR    2025250     91400   19.5400 -113.4800       8.4       174       103        60
OIR    2025250     91400   19.5400 -113.4900       8.4       174       103        60
OIR    2025250     91400   19.5400 -113.5000       8.5       175       103        60
OIR    2025250     91400   19.5400 -113.5100       8.5       175       103        60
OIR    2025250     91400   19.5400 -113.5200       8.6       175       103        60
OIR    2025250     91400   19.5400 -113.5300       8.6       175       103        60
OIR    2025250     91400   19.5400 -113.5400       8.6       175       103        60
OIR    2025250     91400   19.5400 -113.5500       8.6       175       103        60
OIR    2025250     91400   19.5400 -113.5600       8.7       175       103        60
OIR    2025250     91400   19.5400 -113.5700       8.7       175       103        60
OIR    2025250     91400   19.5400 -113.5800       8.7       176       103        60
OIR    2025250     91400   19.5400 -113.5900       8.7       176       103        60
OIR    2025250     91400   19.5400 -113.6000       8.7       176       103        60
OIR    2025250     91400   19.5400 -113.6100       8.7       176       103        60
OIR    2025250     91400   19.5400 -113.6200       8.8       176       103        60
OIR    2025250     91400   19.5400 -113.6300       8.8       176       103        60
OIR    2025250     91400   19.5400 -113.6400       8.8       176       103        60
OIR    2025250     91400   19.5400 -113.6500       8.8       176       103        60
OIR    2025250     91400   19.5400 -113.6600       8.8       176       103        60
OIR    2025250     91400   19.5400 -113.6700       8.8       176       103        60
OIR    2025250     91400   19.5400 -113.6800       8.8       177       103        60
OIR    2025250     91400   19.5400 -113.6900       8.8       177       103        60
OIR    2025250     91400   19.5400 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.5400 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.5400 -113.7200       8.9       177       103        60
OIR    2025250     91400   19.5400 -113.7300       8.9       177       103        60
OIR    2025250     91400   19.5400 -113.7400       8.9       177       103        60
OIR    2025250     91400   19.5400 -113.7500       8.9       177       104        60
OIR    2025250     91400   19.5400 -113.7600       9.0       177       104        60
OIR    2025250     91400   19.5400 -113.7700       9.0       177       104        60
OIR    2025250     91400   19.5400 -113.7800       9.0       178       104        60
OIR    2025250     91400   19.5400 -113.7900       9.0       178       105        60
OIR    2025250     91400   19.5400 -113.8000       9.0       178       105        60
OIR    2025250     91400   19.5400 -113.8100       9.0       178       105        60
OIR    2025250     91400   19.5400 -113.8200       9.0       178       105        60
OIR    2025250     91400   19.5400 -113.8300       9.1       178       104        60
OIR    2025250     91400   19.5400 -113.8400       9.1       179       104        60
OIR    2025250     91400   19.5400 -113.8500       9.1       179       104        60
OIR    2025250     91400   19.5400 -113.8600       9.1       179       104        60
OIR    2025250     91400   19.5400 -113.8700       9.1       179       104        60
OIR    2025250     91400   19.5400 -113.8800       9.1       179       104        60
OIR    2025250     91400   19.5400 -113.8900       9.1       179       104        60
OIR    2025250     91400   19.5400 -113.9000       9.1       180       104        60
OIR    2025250     91400   19.5400 -113.9100       9.1       180       104        60
OIR    2025250     91400   19.5400 -113.9200       9.2       180       104        60
OIR    2025250     91400   19.5400 -113.9300       9.2       180       104        60
OIR    2025250     91400   19.5400 -113.9400       9.2       180       104        60
OIR    2025250     91400   19.5400 -113.9500       9.2       180       104        60
OIR    2025250     91400   19.5400 -113.9600       9.2       181       104        60
OIR    2025250     91400   19.5400 -113.9700       9.2       181       104        60
OIR    2025250     91400   19.5400 -113.9800       9.2       181       104        60
OIR    2025250     91400   19.5400 -113.9900       9.2       181       105        60
OIR    2025250     91400   19.5400 -114.0000       9.2       182       105        60
OIR    2025250     91400   19.5400 -114.0100       9.2       182       105        60
OIR    2025250     91400   19.5400 -114.0200       9.2       182       105        60
OIR    2025250     91400   19.5400 -114.0300       9.2       183       105        60
OIR    2025250     91400   19.5400 -114.0400       9.2       183       104        60
OIR    2025250     91400   19.5400 -114.0500       9.2       183       104        60
OIR    2025250     91400   19.5400 -114.0600       9.2       184       104        60
OIR    2025250     91400   19.5400 -114.0700       9.2       184       104        60
OIR    2025250     91400   19.5400 -114.0800       9.1       184       105        60
OIR    2025250     91400   19.5400 -114.0900       9.1       185       107        60
OIR    2025250     91400   19.5400 -114.1000       9.1       185       105        60
OIR    2025250     91400   19.5400 -114.1100       9.1       185       105        60
OIR    2025250     91400   19.5400 -114.1200       9.1       186       104        60
OIR    2025250     91400   19.5400 -114.1300       9.0       186       104        60
OIR    2025250     91400   19.5400 -114.1400       9.0       186       104        60
OIR    2025250     91400   19.5400 -114.1500       9.0       187       104        60
OIR    2025250     91400   19.5400 -114.1600       8.9       188       105        60
OIR    2025250     91400   19.5400 -114.1700       8.8       188       105        60
OIR    2025250     91400   19.5400 -114.1800       8.8       189       105        60
OIR    2025250     91400   19.5400 -114.1900       8.7       190       107        60
OIR    2025250     91400   19.5400 -114.2000       8.6       191       108        60
OIR    2025250     91400   19.5400 -114.2100       8.5       193       109        60
OIR    2025250     91400   19.5400 -114.2200       8.4       194       108        60
OIR    2025250     91400   19.5400 -114.2300       8.3       196       108        60
OIR    2025250     91400   19.5400 -114.2400       8.2       198       108        60
OIR    2025250     91400   19.5400 -114.2500       8.1       201       108        60
OIR    2025250     91400   19.5400 -114.2600       8.1       203       109        60
OIR    2025250     91400   19.5400 -114.2700       8.1       204       111        60
OIR    2025250     91400   19.5400 -114.2800       8.1       206       112        60
OIR    2025250     91400   19.5400 -114.2900       8.2       212       112        60
OIR    2025250     91400   19.5400 -114.3000       8.3       216       112        60
OIR    2025250     91400   19.5400 -114.3100       8.4       217       111        60
OIR    2025250     91400   19.5400 -114.3200       8.4       217       111        60
OIR    2025250     91400   19.5400 -114.3300       8.4       218       111        60
OIR    2025250     91400   19.5400 -114.3400       8.4       218       111        60
OIR    2025250     91400   19.5400 -114.3500       8.4       219       112        60
OIR    2025250     91400   19.5400 -114.3600       8.4       219       114        60
OIR    2025250     91400   19.5400 -114.3700       8.4       219       115        60
OIR    2025250     91400   19.5400 -114.3800       8.4       219       116        60
OIR    2025250     91400   19.5400 -114.3900       8.4       219       116        60
OIR    2025250     91400   19.5400 -114.4000       8.4       220       116        60
OIR    2025250     91400   19.5400 -114.4100       8.4       220       116        60
OIR    2025250     91400   19.5400 -114.4200       8.4       220       117        60
OIR    2025250     91400   19.5400 -114.4300       8.4       220       122        60
OIR    2025250     91400   19.5400 -114.4400       8.4       220       126        60
OIR    2025250     91400   19.5400 -114.4500       8.4       220       129        60
OIR    2025250     91400   19.5400 -114.4600       8.4       220       131        60
OIR    2025250     91400   19.5400 -114.4700       8.4       220       131        60
OIR    2025250     91400   19.5400 -114.4800       8.3       219       131        60
OIR    2025250     91400   19.5400 -114.4900       8.3       218       128        60
OIR    2025250     91400   19.5400 -114.5000       8.1       217       125        60
OIR    2025250     91400   19.5400 -114.5100       7.9       214       126        60
OIR    2025250     91400   19.5400 -114.5200       7.5       208       127        60
OIR    2025250     91400   19.5400 -114.5300       6.9       199       129        60
OIR    2025250     91400   19.5400 -114.5400       6.5       188       128        60
OIR    2025250     91400   19.5400 -114.5500       6.4       179       128        60
OIR    2025250     91400   19.5400 -114.5600       6.5       174       128        60
OIR    2025250     91400   19.5400 -114.5700       6.5       172       129        60
OIR    2025250     91400   19.5400 -114.5800       6.6       172       130        60
OIR    2025250     91400   19.5400 -114.5900       6.6       171       131        60
OIR    2025250     91400   19.5400 -114.6000       6.6       171       131        60
OIR    2025250     91400   19.5400 -114.6100       6.6       170       131        60
OIR    2025250     91400   19.5400 -114.6200       6.6       170       132        60
OIR    2025250     91400   19.5400 -114.6300       6.6       170       134        60
OIR    2025250     91400   19.5400 -114.6400       6.6       169       137        60
OIR    2025250     91400   19.5400 -114.6500       6.6       169       137        60
OIR    2025250     91400   19.5400 -114.6600       6.7       169       137        60
OIR    2025250     91400   19.5400 -114.6700       6.7       168       137        60
OIR    2025250     91400   19.5400 -114.6800       6.8       167       138        60
OIR    2025250     91400   19.5400 -114.6900       7.0       165       139        60
OIR    2025250     91400   19.5400 -114.7000       7.1       163       139        60
OIR    2025250     91400   19.5400 -114.7100       7.2       162       140        60
OIR    2025250     91400   19.5400 -114.7200       7.4       161       140        60
OIR    2025250     91400   19.5400 -114.7300       7.6       159       140        60
OIR    2025250     91400   19.5400 -115.9100      10.3       189       141        60
OIR    2025250     91400   19.5400 -115.9200      10.4       186       138        60
OIR    2025250     91400   19.5400 -115.9300      10.4       183       137        60
OIR    2025250     91400   19.5400 -115.9400      10.5       182       137        60
OIR    2025250     91400   19.5400 -115.9500      10.5       181       137        60
OIR    2025250     91400   19.5400 -115.9600      10.5       179       137        60
OIR    2025250     91400   19.5400 -115.9700      10.5       178       137        60
OIR    2025250     91400   19.5400 -115.9800      10.5       178       140        60
OIR    2025250     91400   19.5400 -116.2300       8.8       188       140        60
OIR    2025250     91400   19.5400 -116.2400       8.7       189       136        60
OIR    2025250     91400   19.5400 -116.2500       8.7       189       133        60
OIR    2025250     91400   19.5400 -116.2600       8.6       190       131        60
OIR    2025250     91400   19.5400 -116.2700       8.6       190       131        60
OIR    2025250     91400   19.5400 -116.2800       8.6       190       130        60
OIR    2025250     91400   19.5400 -116.2900       8.5       190       129        60
OIR    2025250     91400   19.5400 -116.3000       8.5       190       127        60
OIR    2025250     91400   19.5400 -116.3100       8.5       190       127        60
OIR    2025250     91400   19.5400 -116.3200       8.4       191       127        60
OIR    2025250     91400   19.5400 -116.3300       8.3       192       128        60
OIR    2025250     91400   19.5400 -116.3400       8.1       194       128        60
OIR    2025250     91400   19.5400 -116.3500       7.8       198       129        60
OIR    2025250     91400   19.5400 -116.3600       7.5       202       129        60
OIR    2025250     91400   19.5400 -116.3700       7.3       205       129        60
OIR    2025250     91400   19.5400 -116.3800       7.3       207       131        60
OIR    2025250     91400   19.5400 -116.3900       7.3       207       133        60
OIR    2025250     91400   19.5400 -116.4000       7.3       208       133        60
OIR    2025250     91400   19.5400 -116.4100       7.3       209       134        60
OIR    2025250     91400   19.5400 -116.4200       7.4       211       136        60
OIR    2025250     91400   19.5400 -116.4300       7.6       213       139        60
OIR    2025250     91400   19.5400 -117.9600       6.6        67       142        60
OIR    2025250     91400   19.5400 -117.9700       6.6        67       142        60
OIR    2025250     91400   19.5400 -117.9800       6.6        67       142        60
OIR    2025250     91400   19.5400 -117.9900       6.7        67       142        60
OIR    2025250     91400   19.5400 -118.0000       6.7        67       142        60
OIR    2025250     91400   19.5400 -118.0100       6.7        67       140        60
OIR    2025250     91400   19.5400 -118.0200       6.8        67       138        60
OIR    2025250     91400   19.5400 -118.0300       7.0        68       137        60
OIR    2025250     91400   19.5400 -118.0400       7.2        68       137        60
OIR    2025250     91400   19.5400 -118.0500       7.3        68       138        60
OIR    2025250     91400   19.5400 -118.0600       7.4        68       140        60
OIR    2025250     91400   19.5400 -118.0700       7.5        69       139        60
OIR    2025250     91400   19.5400 -118.0800       7.9        70       139        60
OIR    2025250     91400   19.5400 -118.0900       8.4        72       140        60
OIR    2025250     91400   19.5400 -118.1000       8.4        72       141        60
OIR    2025250     91400   19.5300 -112.8200       7.6       173       140        60
OIR    2025250     91400   19.5300 -112.8700       7.7       173       141        60
OIR    2025250     91400   19.5300 -112.8800       7.7       173       140        60
OIR    2025250     91400   19.5300 -112.9100       7.8       173       138        60
OIR    2025250     91400   19.5300 -112.9200       7.8       173       135        60
OIR    2025250     91400   19.5300 -112.9300       7.8       173       134        60
OIR    2025250     91400   19.5300 -112.9400       7.8       173       134        60
OIR    2025250     91400   19.5300 -112.9500       7.8       173       133        60
OIR    2025250     91400   19.5300 -112.9600       7.8       173       131        60
OIR    2025250     91400   19.5300 -112.9700       7.8       173       130        60
OIR    2025250     91400   19.5300 -112.9800       7.8       173       132        60
OIR    2025250     91400   19.5300 -112.9900       7.8       173       133        60
OIR    2025250     91400   19.5300 -113.0000       7.8       173       131        60
OIR    2025250     91400   19.5300 -113.0100       7.8       173       129        60
OIR    2025250     91400   19.5300 -113.0200       7.8       173       128        60
OIR    2025250     91400   19.5300 -113.0300       7.8       173       126        60
OIR    2025250     91400   19.5300 -113.0400       7.8       173       125        60
OIR    2025250     91400   19.5300 -113.0500       7.8       173       123        60
OIR    2025250     91400   19.5300 -113.0600       7.8       173       122        60
OIR    2025250     91400   19.5300 -113.0700       7.8       173       123        60
OIR    2025250     91400   19.5300 -113.0800       7.8       173       124        60
OIR    2025250     91400   19.5300 -113.0900       7.8       173       123        60
OIR    2025250     91400   19.5300 -113.1000       7.7       173       122        60
OIR    2025250     91400   19.5300 -113.1100       7.7       173       121        60
OIR    2025250     91400   19.5300 -113.1200       7.7       173       122        60
OIR    2025250     91400   19.5300 -113.1300       7.7       174       122        60
OIR    2025250     91400   19.5300 -113.1400       7.7       174       120        60
OIR    2025250     91400   19.5300 -113.1500       7.7       174       117        60
OIR    2025250     91400   19.5300 -113.1600       7.7       174       116        60
OIR    2025250     91400   19.5300 -113.1700       7.7       174       116        60
OIR    2025250     91400   19.5300 -113.1800       7.7       174       116        60
OIR    2025250     91400   19.5300 -113.1900       7.7       174       116        60
OIR    2025250     91400   19.5300 -113.2000       7.7       174       116        60
OIR    2025250     91400   19.5300 -113.2100       7.7       174       115        60
OIR    2025250     91400   19.5300 -113.2200       7.7       174       114        60
OIR    2025250     91400   19.5300 -113.2300       7.7       173       112        60
OIR    2025250     91400   19.5300 -113.2400       7.7       173       111        60
OIR    2025250     91400   19.5300 -113.2500       7.8       173       110        60
OIR    2025250     91400   19.5300 -113.2600       7.8       173       109        60
OIR    2025250     91400   19.5300 -113.2700       7.8       173       108        60
OIR    2025250     91400   19.5300 -113.2800       7.8       173       107        60
OIR    2025250     91400   19.5300 -113.2900       7.8       173       105        60
OIR    2025250     91400   19.5300 -113.3000       7.8       173       105        60
OIR    2025250     91400   19.5300 -113.3100       7.8       173       105        60
OIR    2025250     91400   19.5300 -113.3200       7.9       173       104        60
OIR    2025250     91400   19.5300 -113.3300       7.9       173       104        60
OIR    2025250     91400   19.5300 -113.3400       7.9       173       104        60
OIR    2025250     91400   19.5300 -113.3500       7.9       173       104        60
OIR    2025250     91400   19.5300 -113.3600       8.0       173       104        60
OIR    2025250     91400   19.5300 -113.3700       8.0       173       104        60
OIR    2025250     91400   19.5300 -113.3800       8.0       173       104        60
OIR    2025250     91400   19.5300 -113.3900       8.0       173       104        60
OIR    2025250     91400   19.5300 -113.4000       8.1       173       103        60
OIR    2025250     91400   19.5300 -113.4100       8.1       174       103        60
OIR    2025250     91400   19.5300 -113.4200       8.1       174       103        60
OIR    2025250     91400   19.5300 -113.4300       8.2       174       103        60
OIR    2025250     91400   19.5300 -113.4400       8.2       174       103        60
OIR    2025250     91400   19.5300 -113.4500       8.3       174       103        60
OIR    2025250     91400   19.5300 -113.4600       8.3       174       103        60
OIR    2025250     91400   19.5300 -113.4700       8.3       174       103        60
OIR    2025250     91400   19.5300 -113.4800       8.4       174       103        60
OIR    2025250     91400   19.5300 -113.4900       8.4       175       103        60
OIR    2025250     91400   19.5300 -113.5000       8.5       175       103        60
OIR    2025250     91400   19.5300 -113.5100       8.5       175       103        60
OIR    2025250     91400   19.5300 -113.5200       8.6       175       103        60
OIR    2025250     91400   19.5300 -113.5300       8.6       175       103        60
OIR    2025250     91400   19.5300 -113.5400       8.6       175       103        60
OIR    2025250     91400   19.5300 -113.5500       8.7       175       103        60
OIR    2025250     91400   19.5300 -113.5600       8.7       175       103        60
OIR    2025250     91400   19.5300 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.5300 -113.5800       8.7       176       103        60
OIR    2025250     91400   19.5300 -113.5900       8.7       176       103        60
OIR    2025250     91400   19.5300 -113.6000       8.7       176       103        60
OIR    2025250     91400   19.5300 -113.6100       8.8       176       103        60
OIR    2025250     91400   19.5300 -113.6200       8.8       176       103        60
OIR    2025250     91400   19.5300 -113.6300       8.8       176       103        60
OIR    2025250     91400   19.5300 -113.6400       8.8       176       103        60
OIR    2025250     91400   19.5300 -113.6500       8.8       176       103        60
OIR    2025250     91400   19.5300 -113.6600       8.8       176       103        60
OIR    2025250     91400   19.5300 -113.6700       8.8       177       103        60
OIR    2025250     91400   19.5300 -113.6800       8.8       177       103        60
OIR    2025250     91400   19.5300 -113.6900       8.9       177       103        60
OIR    2025250     91400   19.5300 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.5300 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.5300 -113.7200       8.9       177       103        60
OIR    2025250     91400   19.5300 -113.7300       8.9       177       103        60
OIR    2025250     91400   19.5300 -113.7400       8.9       177       104        60
OIR    2025250     91400   19.5300 -113.7500       8.9       177       104        60
OIR    2025250     91400   19.5300 -113.7600       9.0       177       104        60
OIR    2025250     91400   19.5300 -113.7700       9.0       178       104        60
OIR    2025250     91400   19.5300 -113.7800       9.0       178       104        60
OIR    2025250     91400   19.5300 -113.7900       9.0       178       105        60
OIR    2025250     91400   19.5300 -113.8000       9.0       178       105        60
OIR    2025250     91400   19.5300 -113.8100       9.0       178       105        60
OIR    2025250     91400   19.5300 -113.8200       9.0       178       105        60
OIR    2025250     91400   19.5300 -113.8300       9.1       179       104        60
OIR    2025250     91400   19.5300 -113.8400       9.1       179       104        60
OIR    2025250     91400   19.5300 -113.8500       9.1       179       104        60
OIR    2025250     91400   19.5300 -113.8600       9.1       179       104        60
OIR    2025250     91400   19.5300 -113.8700       9.1       179       104        60
OIR    2025250     91400   19.5300 -113.8800       9.1       179       104        60
OIR    2025250     91400   19.5300 -113.8900       9.1       180       104        60
OIR    2025250     91400   19.5300 -113.9000       9.1       180       104        60
OIR    2025250     91400   19.5300 -113.9100       9.1       180       103        60
OIR    2025250     91400   19.5300 -113.9200       9.2       180       104        60
OIR    2025250     91400   19.5300 -113.9300       9.2       180       104        60
OIR    2025250     91400   19.5300 -113.9400       9.2       180       104        60
OIR    2025250     91400   19.5300 -113.9500       9.2       181       104        60
OIR    2025250     91400   19.5300 -113.9600       9.2       181       104        60
OIR    2025250     91400   19.5300 -113.9700       9.3       181       104        60
OIR    2025250     91400   19.5300 -113.9800       9.3       181       105        60
OIR    2025250     91400   19.5300 -113.9900       9.3       181       105        60
OIR    2025250     91400   19.5300 -114.0000       9.3       182       105        60
OIR    2025250     91400   19.5300 -114.0100       9.3       182       105        60
OIR    2025250     91400   19.5300 -114.0200       9.3       182       107        60
OIR    2025250     91400   19.5300 -114.0300       9.3       183       105        60
OIR    2025250     91400   19.5300 -114.0400       9.2       183       104        60
OIR    2025250     91400   19.5300 -114.0500       9.2       183       104        60
OIR    2025250     91400   19.5300 -114.0600       9.2       184       104        60
OIR    2025250     91400   19.5300 -114.0700       9.2       184       104        60
OIR    2025250     91400   19.5300 -114.0800       9.2       184       105        60
OIR    2025250     91400   19.5300 -114.0900       9.2       185       107        60
OIR    2025250     91400   19.5300 -114.1000       9.1       185       107        60
OIR    2025250     91400   19.5300 -114.1100       9.1       185       105        60
OIR    2025250     91400   19.5300 -114.1200       9.1       186       104        60
OIR    2025250     91400   19.5300 -114.1300       9.1       186       104        60
OIR    2025250     91400   19.5300 -114.1400       9.1       186       104        60
OIR    2025250     91400   19.5300 -114.1500       9.0       187       105        60
OIR    2025250     91400   19.5300 -114.1600       9.0       187       105        60
OIR    2025250     91400   19.5300 -114.1700       8.9       188       107        60
OIR    2025250     91400   19.5300 -114.1800       8.8       189       107        60
OIR    2025250     91400   19.5300 -114.1900       8.8       190       107        60
OIR    2025250     91400   19.5300 -114.2000       8.7       191       108        60
OIR    2025250     91400   19.5300 -114.2100       8.6       192       109        60
OIR    2025250     91400   19.5300 -114.2200       8.5       194       109        60
OIR    2025250     91400   19.5300 -114.2300       8.4       196       109        60
OIR    2025250     91400   19.5300 -114.2400       8.2       199       109        60
OIR    2025250     91400   19.5300 -114.2500       8.2       201       108        60
OIR    2025250     91400   19.5300 -114.2600       8.1       203       109        60
OIR    2025250     91400   19.5300 -114.2700       8.1       205       110        60
OIR    2025250     91400   19.5300 -114.2800       8.1       207       111        60
OIR    2025250     91400   19.5300 -114.2900       8.2       212       112        60
OIR    2025250     91400   19.5300 -114.3000       8.3       215       113        60
OIR    2025250     91400   19.5300 -114.3100       8.4       216       113        60
OIR    2025250     91400   19.5300 -114.3200       8.4       217       112        60
OIR    2025250     91400   19.5300 -114.3300       8.4       218       112        60
OIR    2025250     91400   19.5300 -114.3400       8.4       218       112        60
OIR    2025250     91400   19.5300 -114.3500       8.4       219       113        60
OIR    2025250     91400   19.5300 -114.3600       8.4       219       113        60
OIR    2025250     91400   19.5300 -114.3700       8.4       219       114        60
OIR    2025250     91400   19.5300 -114.3800       8.4       219       116        60
OIR    2025250     91400   19.5300 -114.3900       8.4       220       116        60
OIR    2025250     91400   19.5300 -114.4000       8.4       220       117        60
OIR    2025250     91400   19.5300 -114.4100       8.4       220       117        60
OIR    2025250     91400   19.5300 -114.4200       8.4       220       120        60
OIR    2025250     91400   19.5300 -114.4300       8.4       220       123        60
OIR    2025250     91400   19.5300 -114.4400       8.4       220       126        60
OIR    2025250     91400   19.5300 -114.4500       8.4       220       128        60
OIR    2025250     91400   19.5300 -114.4600       8.4       220       129        60
OIR    2025250     91400   19.5300 -114.4700       8.3       219       130        60
OIR    2025250     91400   19.5300 -114.4800       8.3       219       131        60
OIR    2025250     91400   19.5300 -114.4900       8.2       218       129        60
OIR    2025250     91400   19.5300 -114.5000       8.0       216       126        60
OIR    2025250     91400   19.5300 -114.5100       7.7       213       125        60
OIR    2025250     91400   19.5300 -114.5200       7.4       208       127        60
OIR    2025250     91400   19.5300 -114.5300       6.9       200       128        60
OIR    2025250     91400   19.5300 -114.5400       6.5       189       129        60
OIR    2025250     91400   19.5300 -114.5500       6.4       180       130        60
OIR    2025250     91400   19.5300 -114.5600       6.5       174       130        60
OIR    2025250     91400   19.5300 -114.5700       6.6       172       130        60
OIR    2025250     91400   19.5300 -114.5800       6.6       172       130        60
OIR    2025250     91400   19.5300 -114.5900       6.6       171       131        60
OIR    2025250     91400   19.5300 -114.6000       6.6       171       132        60
OIR    2025250     91400   19.5300 -114.6100       6.6       170       132        60
OIR    2025250     91400   19.5300 -114.6200       6.6       170       132        60
OIR    2025250     91400   19.5300 -114.6300       6.6       170       134        60
OIR    2025250     91400   19.5300 -114.6400       6.7       169       136        60
OIR    2025250     91400   19.5300 -114.6500       6.7       169       136        60
OIR    2025250     91400   19.5300 -114.6600       6.7       169       136        60
OIR    2025250     91400   19.5300 -114.6700       6.8       168       136        60
OIR    2025250     91400   19.5300 -114.6800       6.9       166       137        60
OIR    2025250     91400   19.5300 -114.6900       7.1       164       139        60
OIR    2025250     91400   19.5300 -114.7000       7.2       163       140        60
OIR    2025250     91400   19.5300 -114.7200       7.4       160       141        60
OIR    2025250     91400   19.5300 -114.7300       7.6       158       140        60
OIR    2025250     91400   19.5300 -115.9200      10.3       187       140        60
OIR    2025250     91400   19.5300 -115.9300      10.4       184       137        60
OIR    2025250     91400   19.5300 -115.9400      10.4       183       137        60
OIR    2025250     91400   19.5300 -115.9500      10.5       182       136        60
OIR    2025250     91400   19.5300 -115.9600      10.5       180       136        60
OIR    2025250     91400   19.5300 -115.9700      10.5       179       137        60
OIR    2025250     91400   19.5300 -115.9800      10.5       178       140        60
OIR    2025250     91400   19.5300 -116.2300       8.8       189       139        60
OIR    2025250     91400   19.5300 -116.2400       8.7       189       134        60
OIR    2025250     91400   19.5300 -116.2500       8.7       189       132        60
OIR    2025250     91400   19.5300 -116.2600       8.7       189       130        60
OIR    2025250     91400   19.5300 -116.2700       8.6       190       129        60
OIR    2025250     91400   19.5300 -116.2800       8.6       190       127        60
OIR    2025250     91400   19.5300 -116.2900       8.6       190       126        60
OIR    2025250     91400   19.5300 -116.3000       8.5       190       126        60
OIR    2025250     91400   19.5300 -116.3100       8.5       190       126        60
OIR    2025250     91400   19.5300 -116.3200       8.4       190       126        60
OIR    2025250     91400   19.5300 -116.3300       8.3       192       127        60
OIR    2025250     91400   19.5300 -116.3400       8.0       194       128        60
OIR    2025250     91400   19.5300 -116.3500       7.6       199       128        60
OIR    2025250     91400   19.5300 -116.3600       7.4       203       128        60
OIR    2025250     91400   19.5300 -116.3700       7.2       205       128        60
OIR    2025250     91400   19.5300 -116.3800       7.2       207       131        60
OIR    2025250     91400   19.5300 -116.3900       7.2       207       133        60
OIR    2025250     91400   19.5300 -116.4000       7.2       208       135        60
OIR    2025250     91400   19.5300 -116.4100       7.2       209       137        60
OIR    2025250     91400   19.5300 -116.4200       7.3       210       139        60
OIR    2025250     91400   19.5300 -116.4300       7.4       213       141        60
OIR    2025250     91400   19.5300 -118.0100       6.7        67       141        60
OIR    2025250     91400   19.5300 -118.0200       6.7        67       138        60
OIR    2025250     91400   19.5300 -118.0300       6.9        68       138        60
OIR    2025250     91400   19.5300 -118.0400       7.1        68       138        60
OIR    2025250     91400   19.5300 -118.0500       7.3        68       139        60
OIR    2025250     91400   19.5300 -118.0600       7.4        68       140        60
OIR    2025250     91400   19.5300 -118.0700       7.4        69       140        60
OIR    2025250     91400   19.5300 -118.0800       7.8        70       139        60
OIR    2025250     91400   19.5300 -118.0900       8.3        72       139        60
OIR    2025250     91400   19.5300 -118.1000       8.4        72       140        60
OIR    2025250     91400   19.5200 -112.8300       7.6       173       141        60
OIR    2025250     91400   19.5200 -112.8700       7.7       173       140        60
OIR    2025250     91400   19.5200 -112.8800       7.7       173       139        60
OIR    2025250     91400   19.5200 -112.8900       7.7       173       140        60
OIR    2025250     91400   19.5200 -112.9100       7.8       173       139        60
OIR    2025250     91400   19.5200 -112.9200       7.8       173       137        60
OIR    2025250     91400   19.5200 -112.9300       7.8       173       135        60
OIR    2025250     91400   19.5200 -112.9400       7.8       173       135        60
OIR    2025250     91400   19.5200 -112.9500       7.8       173       133        60
OIR    2025250     91400   19.5200 -112.9600       7.8       173       130        60
OIR    2025250     91400   19.5200 -112.9700       7.8       173       126        60
OIR    2025250     91400   19.5200 -112.9800       7.8       173       129        60
OIR    2025250     91400   19.5200 -112.9900       7.8       173       132        60
OIR    2025250     91400   19.5200 -113.0000       7.8       173       130        60
OIR    2025250     91400   19.5200 -113.0100       7.8       173       127        60
OIR    2025250     91400   19.5200 -113.0200       7.8       173       126        60
OIR    2025250     91400   19.5200 -113.0300       7.8       173       126        60
OIR    2025250     91400   19.5200 -113.0400       7.8       173       125        60
OIR    2025250     91400   19.5200 -113.0500       7.8       173       124        60
OIR    2025250     91400   19.5200 -113.0600       7.8       173       124        60
OIR    2025250     91400   19.5200 -113.0700       7.8       173       123        60
OIR    2025250     91400   19.5200 -113.0800       7.8       173       124        60
OIR    2025250     91400   19.5200 -113.0900       7.7       173       123        60
OIR    2025250     91400   19.5200 -113.1000       7.7       173       122        60
OIR    2025250     91400   19.5200 -113.1100       7.7       174       122        60
OIR    2025250     91400   19.5200 -113.1200       7.7       174       121        60
OIR    2025250     91400   19.5200 -113.1300       7.7       174       121        60
OIR    2025250     91400   19.5200 -113.1400       7.7       174       120        60
OIR    2025250     91400   19.5200 -113.1500       7.7       174       119        60
OIR    2025250     91400   19.5200 -113.1600       7.7       174       117        60
OIR    2025250     91400   19.5200 -113.1700       7.7       174       116        60
OIR    2025250     91400   19.5200 -113.1800       7.7       174       116        60
OIR    2025250     91400   19.5200 -113.1900       7.7       174       115        60
OIR    2025250     91400   19.5200 -113.2000       7.7       174       115        60
OIR    2025250     91400   19.5200 -113.2100       7.7       174       114        60
OIR    2025250     91400   19.5200 -113.2200       7.7       174       113        60
OIR    2025250     91400   19.5200 -113.2300       7.7       174       112        60
OIR    2025250     91400   19.5200 -113.2400       7.8       174       111        60
OIR    2025250     91400   19.5200 -113.2500       7.8       173       109        60
OIR    2025250     91400   19.5200 -113.2600       7.8       173       109        60
OIR    2025250     91400   19.5200 -113.2700       7.8       173       108        60
OIR    2025250     91400   19.5200 -113.2800       7.8       173       107        60
OIR    2025250     91400   19.5200 -113.2900       7.8       173       105        60
OIR    2025250     91400   19.5200 -113.3000       7.8       173       105        60
OIR    2025250     91400   19.5200 -113.3100       7.9       173       104        60
OIR    2025250     91400   19.5200 -113.3200       7.9       173       104        60
OIR    2025250     91400   19.5200 -113.3300       7.9       173       104        60
OIR    2025250     91400   19.5200 -113.3400       7.9       173       104        60
OIR    2025250     91400   19.5200 -113.3500       7.9       173       104        60
OIR    2025250     91400   19.5200 -113.3600       8.0       173       104        60
OIR    2025250     91400   19.5200 -113.3700       8.0       173       104        60
OIR    2025250     91400   19.5200 -113.3800       8.0       173       104        60
OIR    2025250     91400   19.5200 -113.3900       8.0       174       104        60
OIR    2025250     91400   19.5200 -113.4000       8.1       174       104        60
OIR    2025250     91400   19.5200 -113.4100       8.1       174       104        60
OIR    2025250     91400   19.5200 -113.4200       8.1       174       103        60
OIR    2025250     91400   19.5200 -113.4300       8.2       174       103        60
OIR    2025250     91400   19.5200 -113.4400       8.2       174       103        60
OIR    2025250     91400   19.5200 -113.4500       8.3       174       103        60
OIR    2025250     91400   19.5200 -113.4600       8.3       174       103        60
OIR    2025250     91400   19.5200 -113.4700       8.3       174       103        60
OIR    2025250     91400   19.5200 -113.4800       8.4       175       103        60
OIR    2025250     91400   19.5200 -113.4900       8.4       175       103        60
OIR    2025250     91400   19.5200 -113.5000       8.5       175       103        60
OIR    2025250     91400   19.5200 -113.5100       8.5       175       103        60
OIR    2025250     91400   19.5200 -113.5200       8.6       175       103        60
OIR    2025250     91400   19.5200 -113.5300       8.6       175       103        60
OIR    2025250     91400   19.5200 -113.5400       8.6       175       103        60
OIR    2025250     91400   19.5200 -113.5500       8.6       176       103        60
OIR    2025250     91400   19.5200 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.5200 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.5200 -113.5800       8.7       176       103        60
OIR    2025250     91400   19.5200 -113.5900       8.7       176       103        60
OIR    2025250     91400   19.5200 -113.6000       8.7       176       103        60
OIR    2025250     91400   19.5200 -113.6100       8.8       176       103        60
OIR    2025250     91400   19.5200 -113.6200       8.8       176       103        60
OIR    2025250     91400   19.5200 -113.6300       8.8       176       103        60
OIR    2025250     91400   19.5200 -113.6400       8.8       176       103        60
OIR    2025250     91400   19.5200 -113.6500       8.8       176       103        60
OIR    2025250     91400   19.5200 -113.6600       8.8       177       103        60
OIR    2025250     91400   19.5200 -113.6700       8.8       177       103        60
OIR    2025250     91400   19.5200 -113.6800       8.8       177       103        60
OIR    2025250     91400   19.5200 -113.6900       8.9       177       103        60
OIR    2025250     91400   19.5200 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.5200 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.5200 -113.7200       8.9       177       103        60
OIR    2025250     91400   19.5200 -113.7300       8.9       177       103        60
OIR    2025250     91400   19.5200 -113.7400       8.9       177       103        60
OIR    2025250     91400   19.5200 -113.7500       9.0       177       104        60
OIR    2025250     91400   19.5200 -113.7600       9.0       178       104        60
OIR    2025250     91400   19.5200 -113.7700       9.0       178       104        60
OIR    2025250     91400   19.5200 -113.7800       9.0       178       105        60
OIR    2025250     91400   19.5200 -113.7900       9.0       178       105        60
OIR    2025250     91400   19.5200 -113.8000       9.0       178       105        60
OIR    2025250     91400   19.5200 -113.8100       9.0       178       105        60
OIR    2025250     91400   19.5200 -113.8200       9.0       178       105        60
OIR    2025250     91400   19.5200 -113.8300       9.1       179       105        60
OIR    2025250     91400   19.5200 -113.8400       9.1       179       105        60
OIR    2025250     91400   19.5200 -113.8500       9.1       179       105        60
OIR    2025250     91400   19.5200 -113.8600       9.1       179       105        60
OIR    2025250     91400   19.5200 -113.8700       9.1       179       105        60
OIR    2025250     91400   19.5200 -113.8800       9.1       179       105        60
OIR    2025250     91400   19.5200 -113.8900       9.1       180       105        60
OIR    2025250     91400   19.5200 -113.9000       9.1       180       104        60
OIR    2025250     91400   19.5200 -113.9100       9.2       180       104        60
OIR    2025250     91400   19.5200 -113.9200       9.2       180       104        60
OIR    2025250     91400   19.5200 -113.9300       9.2       180       104        60
OIR    2025250     91400   19.5200 -113.9400       9.2       181       104        60
OIR    2025250     91400   19.5200 -113.9500       9.3       181       104        60
OIR    2025250     91400   19.5200 -113.9600       9.3       181       104        60
OIR    2025250     91400   19.5200 -113.9700       9.3       181       105        60
OIR    2025250     91400   19.5200 -113.9800       9.3       181       105        60
OIR    2025250     91400   19.5200 -113.9900       9.3       182       107        60
OIR    2025250     91400   19.5200 -114.0000       9.3       182       107        60
OIR    2025250     91400   19.5200 -114.0100       9.3       182       107        60
OIR    2025250     91400   19.5200 -114.0200       9.3       182       107        60
OIR    2025250     91400   19.5200 -114.0300       9.3       183       107        60
OIR    2025250     91400   19.5200 -114.0400       9.3       183       105        60
OIR    2025250     91400   19.5200 -114.0500       9.3       183       104        60
OIR    2025250     91400   19.5200 -114.0600       9.3       184       105        60
OIR    2025250     91400   19.5200 -114.0700       9.2       184       105        60
OIR    2025250     91400   19.5200 -114.0800       9.2       184       107        60
OIR    2025250     91400   19.5200 -114.0900       9.2       185       107        60
OIR    2025250     91400   19.5200 -114.1000       9.2       185       107        60
OIR    2025250     91400   19.5200 -114.1100       9.2       185       107        60
OIR    2025250     91400   19.5200 -114.1200       9.2       186       105        60
OIR    2025250     91400   19.5200 -114.1300       9.1       186       105        60
OIR    2025250     91400   19.5200 -114.1400       9.1       186       105        60
OIR    2025250     91400   19.5200 -114.1500       9.1       187       105        60
OIR    2025250     91400   19.5200 -114.1600       9.0       187       107        60
OIR    2025250     91400   19.5200 -114.1700       9.0       188       107        60
OIR    2025250     91400   19.5200 -114.1800       8.9       189       107        60
OIR    2025250     91400   19.5200 -114.1900       8.8       190       108        60
OIR    2025250     91400   19.5200 -114.2000       8.7       191       108        60
OIR    2025250     91400   19.5200 -114.2100       8.6       192       109        60
OIR    2025250     91400   19.5200 -114.2200       8.5       194       109        60
OIR    2025250     91400   19.5200 -114.2300       8.5       195       109        60
OIR    2025250     91400   19.5200 -114.2400       8.3       199       109        60
OIR    2025250     91400   19.5200 -114.2500       8.3       201       109        60
OIR    2025250     91400   19.5200 -114.2600       8.2       203       109        60
OIR    2025250     91400   19.5200 -114.2700       8.2       205       110        60
OIR    2025250     91400   19.5200 -114.2800       8.2       207       110        60
OIR    2025250     91400   19.5200 -114.2900       8.2       211       112        60
OIR    2025250     91400   19.5200 -114.3000       8.3       215       113        60
OIR    2025250     91400   19.5200 -114.3100       8.4       216       114        60
OIR    2025250     91400   19.5200 -114.3200       8.4       217       113        60
OIR    2025250     91400   19.5200 -114.3300       8.4       218       112        60
OIR    2025250     91400   19.5200 -114.3400       8.4       218       113        60
OIR    2025250     91400   19.5200 -114.3500       8.4       219       114        60
OIR    2025250     91400   19.5200 -114.3600       8.4       219       113        60
OIR    2025250     91400   19.5200 -114.3700       8.4       219       113        60
OIR    2025250     91400   19.5200 -114.3800       8.4       219       115        60
OIR    2025250     91400   19.5200 -114.3900       8.4       220       116        60
OIR    2025250     91400   19.5200 -114.4000       8.4       220       119        60
OIR    2025250     91400   19.5200 -114.4100       8.4       220       121        60
OIR    2025250     91400   19.5200 -114.4200       8.4       220       123        60
OIR    2025250     91400   19.5200 -114.4300       8.4       220       125        60
OIR    2025250     91400   19.5200 -114.4400       8.4       220       126        60
OIR    2025250     91400   19.5200 -114.4500       8.4       220       126        60
OIR    2025250     91400   19.5200 -114.4600       8.4       220       126        60
OIR    2025250     91400   19.5200 -114.4700       8.3       219       128        60
OIR    2025250     91400   19.5200 -114.4800       8.2       218       130        60
OIR    2025250     91400   19.5200 -114.4900       8.1       217       130        60
OIR    2025250     91400   19.5200 -114.5000       7.9       215       129        60
OIR    2025250     91400   19.5200 -114.5100       7.6       212       128        60
OIR    2025250     91400   19.5200 -114.5200       7.3       207       128        60
OIR    2025250     91400   19.5200 -114.5300       6.9       201       128        60
OIR    2025250     91400   19.5200 -114.5400       6.5       191       129        60
OIR    2025250     91400   19.5200 -114.5500       6.4       180       130        60
OIR    2025250     91400   19.5200 -114.5600       6.5       174       129        60
OIR    2025250     91400   19.5200 -114.5700       6.6       172       129        60
OIR    2025250     91400   19.5200 -114.5800       6.6       172       129        60
OIR    2025250     91400   19.5200 -114.5900       6.6       171       131        60
OIR    2025250     91400   19.5200 -114.6000       6.7       171       132        60
OIR    2025250     91400   19.5200 -114.6100       6.7       170       133        60
OIR    2025250     91400   19.5200 -114.6200       6.7       170       133        60
OIR    2025250     91400   19.5200 -114.6300       6.7       170       134        60
OIR    2025250     91400   19.5200 -114.6400       6.7       169       136        60
OIR    2025250     91400   19.5200 -114.6500       6.7       169       136        60
OIR    2025250     91400   19.5200 -114.6600       6.7       169       136        60
OIR    2025250     91400   19.5200 -114.6700       6.8       167       137        60
OIR    2025250     91400   19.5200 -114.6800       7.0       165       138        60
OIR    2025250     91400   19.5200 -114.6900       7.1       164       140        60
OIR    2025250     91400   19.5200 -115.9200      10.2       188       141        60
OIR    2025250     91400   19.5200 -115.9300      10.3       185       137        60
OIR    2025250     91400   19.5200 -115.9400      10.4       183       138        60
OIR    2025250     91400   19.5200 -115.9500      10.4       182       139        60
OIR    2025250     91400   19.5200 -115.9600      10.5       181       138        60
OIR    2025250     91400   19.5200 -115.9700      10.5       179       137        60
OIR    2025250     91400   19.5200 -115.9800      10.5       179       139        60
OIR    2025250     91400   19.5200 -116.1900       9.9       183       143        60
OIR    2025250     91400   19.5200 -116.2000       9.7       183       142        60
OIR    2025250     91400   19.5200 -116.2100       9.4       184       143        60
OIR    2025250     91400   19.5200 -116.2200       9.0       187       143        60
OIR    2025250     91400   19.5200 -116.2300       8.8       189       138        60
OIR    2025250     91400   19.5200 -116.2400       8.8       189       133        60
OIR    2025250     91400   19.5200 -116.2500       8.7       189       131        60
OIR    2025250     91400   19.5200 -116.2600       8.7       189       129        60
OIR    2025250     91400   19.5200 -116.2700       8.7       189       127        60
OIR    2025250     91400   19.5200 -116.2800       8.7       190       126        60
OIR    2025250     91400   19.5200 -116.2900       8.6       190       125        60
OIR    2025250     91400   19.5200 -116.3000       8.6       190       124        60
OIR    2025250     91400   19.5200 -116.3100       8.5       190       124        60
OIR    2025250     91400   19.5200 -116.3200       8.4       190       125        60
OIR    2025250     91400   19.5200 -116.3300       8.3       191       126        60
OIR    2025250     91400   19.5200 -116.3400       8.0       194       127        60
OIR    2025250     91400   19.5200 -116.3500       7.6       199       128        60
OIR    2025250     91400   19.5200 -116.3600       7.3       203       128        60
OIR    2025250     91400   19.5200 -116.3700       7.2       205       128        60
OIR    2025250     91400   19.5200 -116.3800       7.2       206       131        60
OIR    2025250     91400   19.5200 -116.3900       7.1       207       134        60
OIR    2025250     91400   19.5200 -116.4000       7.1       208       137        60
OIR    2025250     91400   19.5200 -116.4100       7.1       209       139        60
OIR    2025250     91400   19.5200 -118.0100       6.7        67       142        60
OIR    2025250     91400   19.5200 -118.0200       6.7        67       137        60
OIR    2025250     91400   19.5200 -118.0300       6.8        68       137        60
OIR    2025250     91400   19.5200 -118.0400       7.0        68       138        60
OIR    2025250     91400   19.5200 -118.0500       7.2        68       139        60
OIR    2025250     91400   19.5200 -118.0600       7.3        69       139        60
OIR    2025250     91400   19.5200 -118.0700       7.4        69       140        60
OIR    2025250     91400   19.5200 -118.0800       7.8        70       140        60
OIR    2025250     91400   19.5200 -118.0900       8.3        72       140        60
OIR    2025250     91400   19.5100 -109.7400      14.3        22       136        60
OIR    2025250     91400   19.5100 -112.8600       7.7       173       141        60
OIR    2025250     91400   19.5100 -112.8700       7.7       173       139        60
OIR    2025250     91400   19.5100 -112.8800       7.7       173       137        60
OIR    2025250     91400   19.5100 -112.8900       7.7       173       136        60
OIR    2025250     91400   19.5100 -112.9000       7.8       173       136        60
OIR    2025250     91400   19.5100 -112.9100       7.8       173       136        60
OIR    2025250     91400   19.5100 -112.9200       7.8       173       137        60
OIR    2025250     91400   19.5100 -112.9300       7.8       173       136        60
OIR    2025250     91400   19.5100 -112.9400       7.8       173       133        60
OIR    2025250     91400   19.5100 -112.9500       7.8       173       131        60
OIR    2025250     91400   19.5100 -112.9600       7.8       173       130        60
OIR    2025250     91400   19.5100 -112.9700       7.8       173       130        60
OIR    2025250     91400   19.5100 -112.9800       7.8       173       131        60
OIR    2025250     91400   19.5100 -112.9900       7.8       173       132        60
OIR    2025250     91400   19.5100 -113.0000       7.8       173       132        60
OIR    2025250     91400   19.5100 -113.0100       7.8       173       129        60
OIR    2025250     91400   19.5100 -113.0200       7.8       173       126        60
OIR    2025250     91400   19.5100 -113.0300       7.8       173       126        60
OIR    2025250     91400   19.5100 -113.0400       7.8       173       126        60
OIR    2025250     91400   19.5100 -113.0500       7.8       173       127        60
OIR    2025250     91400   19.5100 -113.0600       7.8       173       128        60
OIR    2025250     91400   19.5100 -113.0700       7.8       173       128        60
OIR    2025250     91400   19.5100 -113.0800       7.8       173       126        60
OIR    2025250     91400   19.5100 -113.0900       7.7       174       124        60
OIR    2025250     91400   19.5100 -113.1000       7.7       174       125        60
OIR    2025250     91400   19.5100 -113.1100       7.7       174       125        60
OIR    2025250     91400   19.5100 -113.1200       7.7       174       123        60
OIR    2025250     91400   19.5100 -113.1300       7.7       174       121        60
OIR    2025250     91400   19.5100 -113.1400       7.7       174       120        60
OIR    2025250     91400   19.5100 -113.1500       7.7       174       120        60
OIR    2025250     91400   19.5100 -113.1600       7.7       174       119        60
OIR    2025250     91400   19.5100 -113.1700       7.7       174       116        60
OIR    2025250     91400   19.5100 -113.1800       7.7       174       116        60
OIR    2025250     91400   19.5100 -113.1900       7.7       174       115        60
OIR    2025250     91400   19.5100 -113.2000       7.7       174       115        60
OIR    2025250     91400   19.5100 -113.2100       7.7       174       114        60
OIR    2025250     91400   19.5100 -113.2200       7.7       174       113        60
OIR    2025250     91400   19.5100 -113.2300       7.8       174       112        60
OIR    2025250     91400   19.5100 -113.2400       7.8       174       111        60
OIR    2025250     91400   19.5100 -113.2500       7.8       174       109        60
OIR    2025250     91400   19.5100 -113.2600       7.8       174       109        60
OIR    2025250     91400   19.5100 -113.2700       7.8       173       109        60
OIR    2025250     91400   19.5100 -113.2800       7.8       173       108        60
OIR    2025250     91400   19.5100 -113.2900       7.8       173       105        60
OIR    2025250     91400   19.5100 -113.3000       7.8       173       105        60
OIR    2025250     91400   19.5100 -113.3100       7.9       173       104        60
OIR    2025250     91400   19.5100 -113.3200       7.9       173       104        60
OIR    2025250     91400   19.5100 -113.3300       7.9       173       104        60
OIR    2025250     91400   19.5100 -113.3400       7.9       173       104        60
OIR    2025250     91400   19.5100 -113.3500       7.9       173       104        60
OIR    2025250     91400   19.5100 -113.3600       8.0       174       104        60
OIR    2025250     91400   19.5100 -113.3700       8.0       174       104        60
OIR    2025250     91400   19.5100 -113.3800       8.0       174       104        60
OIR    2025250     91400   19.5100 -113.3900       8.0       174       104        60
OIR    2025250     91400   19.5100 -113.4000       8.1       174       104        60
OIR    2025250     91400   19.5100 -113.4100       8.1       174       104        60
OIR    2025250     91400   19.5100 -113.4200       8.1       174       104        60
OIR    2025250     91400   19.5100 -113.4300       8.2       174       103        60
OIR    2025250     91400   19.5100 -113.4400       8.2       174       103        60
OIR    2025250     91400   19.5100 -113.4500       8.3       174       103        60
OIR    2025250     91400   19.5100 -113.4600       8.3       174       103        60
OIR    2025250     91400   19.5100 -113.4700       8.4       175       103        60
OIR    2025250     91400   19.5100 -113.4800       8.4       175       103        60
OIR    2025250     91400   19.5100 -113.4900       8.5       175       103        60
OIR    2025250     91400   19.5100 -113.5000       8.5       175       103        60
OIR    2025250     91400   19.5100 -113.5100       8.5       175       103        60
OIR    2025250     91400   19.5100 -113.5200       8.6       175       103        60
OIR    2025250     91400   19.5100 -113.5300       8.6       175       103        60
OIR    2025250     91400   19.5100 -113.5400       8.6       176       103        60
OIR    2025250     91400   19.5100 -113.5500       8.6       176       103        60
OIR    2025250     91400   19.5100 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.5100 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.5100 -113.5800       8.7       176       103        60
OIR    2025250     91400   19.5100 -113.5900       8.7       176       103        60
OIR    2025250     91400   19.5100 -113.6000       8.8       176       103        60
OIR    2025250     91400   19.5100 -113.6100       8.8       176       103        60
OIR    2025250     91400   19.5100 -113.6200       8.8       176       103        60
OIR    2025250     91400   19.5100 -113.6300       8.8       176       103        60
OIR    2025250     91400   19.5100 -113.6400       8.8       176       103        60
OIR    2025250     91400   19.5100 -113.6500       8.8       177       103        60
OIR    2025250     91400   19.5100 -113.6600       8.8       177       103        60
OIR    2025250     91400   19.5100 -113.6700       8.8       177       103        60
OIR    2025250     91400   19.5100 -113.6800       8.9       177       103        60
OIR    2025250     91400   19.5100 -113.6900       8.9       177       103        60
OIR    2025250     91400   19.5100 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.5100 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.5100 -113.7200       8.9       177       103        60
OIR    2025250     91400   19.5100 -113.7300       8.9       177       103        60
OIR    2025250     91400   19.5100 -113.7400       8.9       177       103        60
OIR    2025250     91400   19.5100 -113.7500       9.0       178       104        60
OIR    2025250     91400   19.5100 -113.7600       9.0       178       104        60
OIR    2025250     91400   19.5100 -113.7700       9.0       178       104        60
OIR    2025250     91400   19.5100 -113.7800       9.0       178       104        60
OIR    2025250     91400   19.5100 -113.7900       9.0       178       105        60
OIR    2025250     91400   19.5100 -113.8000       9.0       178       105        60
OIR    2025250     91400   19.5100 -113.8100       9.0       178       105        60
OIR    2025250     91400   19.5100 -113.8200       9.0       179       105        60
OIR    2025250     91400   19.5100 -113.8300       9.1       179       105        60
OIR    2025250     91400   19.5100 -113.8400       9.1       179       105        60
OIR    2025250     91400   19.5100 -113.8500       9.1       179       105        60
OIR    2025250     91400   19.5100 -113.8600       9.1       179       105        60
OIR    2025250     91400   19.5100 -113.8700       9.1       179       105        60
OIR    2025250     91400   19.5100 -113.8800       9.1       180       105        60
OIR    2025250     91400   19.5100 -113.8900       9.1       180       105        60
OIR    2025250     91400   19.5100 -113.9000       9.1       180       105        60
OIR    2025250     91400   19.5100 -113.9100       9.2       180       104        60
OIR    2025250     91400   19.5100 -113.9200       9.2       180       104        60
OIR    2025250     91400   19.5100 -113.9300       9.2       181       105        60
OIR    2025250     91400   19.5100 -113.9400       9.3       181       105        60
OIR    2025250     91400   19.5100 -113.9500       9.3       181       105        60
OIR    2025250     91400   19.5100 -113.9600       9.3       181       105        60
OIR    2025250     91400   19.5100 -113.9700       9.3       181       107        60
OIR    2025250     91400   19.5100 -113.9800       9.3       181       107        60
OIR    2025250     91400   19.5100 -113.9900       9.3       182       107        60
OIR    2025250     91400   19.5100 -114.0000       9.3       182       108        60
OIR    2025250     91400   19.5100 -114.0100       9.3       182       108        60
OIR    2025250     91400   19.5100 -114.0200       9.3       183       108        60
OIR    2025250     91400   19.5100 -114.0300       9.3       183       107        60
OIR    2025250     91400   19.5100 -114.0400       9.3       183       107        60
OIR    2025250     91400   19.5100 -114.0500       9.3       183       105        60
OIR    2025250     91400   19.5100 -114.0600       9.3       184       105        60
OIR    2025250     91400   19.5100 -114.0700       9.3       184       107        60
OIR    2025250     91400   19.5100 -114.0800       9.3       184       107        60
OIR    2025250     91400   19.5100 -114.0900       9.2       185       107        60
OIR    2025250     91400   19.5100 -114.1000       9.2       185       108        60
OIR    2025250     91400   19.5100 -114.1100       9.2       185       107        60
OIR    2025250     91400   19.5100 -114.1200       9.2       186       107        60
OIR    2025250     91400   19.5100 -114.1300       9.2       186       105        60
OIR    2025250     91400   19.5100 -114.1400       9.1       186       105        60
OIR    2025250     91400   19.5100 -114.1500       9.1       187       107        60
OIR    2025250     91400   19.5100 -114.1600       9.1       187       107        60
OIR    2025250     91400   19.5100 -114.1700       9.0       188       108        60
OIR    2025250     91400   19.5100 -114.1800       9.0       189       108        60
OIR    2025250     91400   19.5100 -114.1900       8.9       189       109        60
OIR    2025250     91400   19.5100 -114.2000       8.8       190       109        60
OIR    2025250     91400   19.5100 -114.2100       8.8       192       110        60
OIR    2025250     91400   19.5100 -114.2200       8.7       193       110        60
OIR    2025250     91400   19.5100 -114.2300       8.6       195       109        60
OIR    2025250     91400   19.5100 -114.2400       8.5       198       109        60
OIR    2025250     91400   19.5100 -114.2500       8.4       200       110        60
OIR    2025250     91400   19.5100 -114.2600       8.3       203       110        60
OIR    2025250     91400   19.5100 -114.2700       8.3       204       111        60
OIR    2025250     91400   19.5100 -114.2800       8.2       207       112        60
OIR    2025250     91400   19.5100 -114.2900       8.2       211       113        60
OIR    2025250     91400   19.5100 -114.3000       8.3       214       113        60
OIR    2025250     91400   19.5100 -114.3100       8.4       216       114        60
OIR    2025250     91400   19.5100 -114.3200       8.4       217       114        60
OIR    2025250     91400   19.5100 -114.3300       8.4       217       114        60
OIR    2025250     91400   19.5100 -114.3400       8.4       218       114        60
OIR    2025250     91400   19.5100 -114.3500       8.4       218       115        60
OIR    2025250     91400   19.5100 -114.3600       8.4       219       115        60
OIR    2025250     91400   19.5100 -114.3700       8.4       219       114        60
OIR    2025250     91400   19.5100 -114.3800       8.4       220       115        60
OIR    2025250     91400   19.5100 -114.3900       8.4       220       116        60
OIR    2025250     91400   19.5100 -114.4000       8.4       220       119        60
OIR    2025250     91400   19.5100 -114.4100       8.4       220       122        60
OIR    2025250     91400   19.5100 -114.4200       8.4       220       125        60
OIR    2025250     91400   19.5100 -114.4300       8.4       220       126        60
OIR    2025250     91400   19.5100 -114.4400       8.4       220       128        60
OIR    2025250     91400   19.5100 -114.4500       8.3       220       128        60
OIR    2025250     91400   19.5100 -114.4600       8.3       219       127        60
OIR    2025250     91400   19.5100 -114.4700       8.2       218       128        60
OIR    2025250     91400   19.5100 -114.4800       8.1       217       130        60
OIR    2025250     91400   19.5100 -114.4900       8.0       215       131        60
OIR    2025250     91400   19.5100 -114.5000       7.8       213       131        60
OIR    2025250     91400   19.5100 -114.5100       7.6       211       130        60
OIR    2025250     91400   19.5100 -114.5200       7.3       207       130        60
OIR    2025250     91400   19.5100 -114.5300       6.9       201       129        60
OIR    2025250     91400   19.5100 -114.5400       6.6       191       129        60
OIR    2025250     91400   19.5100 -114.5500       6.5       180       129        60
OIR    2025250     91400   19.5100 -114.5600       6.6       174       129        60
OIR    2025250     91400   19.5100 -114.5700       6.6       173       128        60
OIR    2025250     91400   19.5100 -114.5800       6.7       172       128        60
OIR    2025250     91400   19.5100 -114.5900       6.7       171       130        60
OIR    2025250     91400   19.5100 -114.6000       6.7       171       132        60
OIR    2025250     91400   19.5100 -114.6100       6.7       170       133        60
OIR    2025250     91400   19.5100 -114.6200       6.7       170       134        60
OIR    2025250     91400   19.5100 -114.6300       6.7       170       135        60
OIR    2025250     91400   19.5100 -114.6400       6.7       169       136        60
OIR    2025250     91400   19.5100 -114.6500       6.7       169       136        60
OIR    2025250     91400   19.5100 -114.6600       6.7       168       137        60
OIR    2025250     91400   19.5100 -114.6700       6.8       167       138        60
OIR    2025250     91400   19.5100 -114.6800       7.0       165       140        60
OIR    2025250     91400   19.5100 -115.9300      10.3       186       139        60
OIR    2025250     91400   19.5100 -115.9400      10.4       184       139        60
OIR    2025250     91400   19.5100 -115.9500      10.4       183       141        60
OIR    2025250     91400   19.5100 -115.9600      10.5       181       140        60
OIR    2025250     91400   19.5100 -115.9700      10.5       180       138        60
OIR    2025250     91400   19.5100 -115.9800      10.5       179       139        60
OIR    2025250     91400   19.5100 -115.9900      10.5       179       142        60
OIR    2025250     91400   19.5100 -116.2000       9.7       184       140        60
OIR    2025250     91400   19.5100 -116.2100       9.4       185       139        60
OIR    2025250     91400   19.5100 -116.2200       9.0       188       138        60
OIR    2025250     91400   19.5100 -116.2300       8.9       189       135        60
OIR    2025250     91400   19.5100 -116.2400       8.8       189       132        60
OIR    2025250     91400   19.5100 -116.2500       8.8       189       130        60
OIR    2025250     91400   19.5100 -116.2600       8.7       189       128        60
OIR    2025250     91400   19.5100 -116.2700       8.7       189       127        60
OIR    2025250     91400   19.5100 -116.2800       8.7       189       125        60
OIR    2025250     91400   19.5100 -116.2900       8.6       190       124        60
OIR    2025250     91400   19.5100 -116.3000       8.6       190       124        60
OIR    2025250     91400   19.5100 -116.3100       8.5       190       124        60
OIR    2025250     91400   19.5100 -116.3200       8.5       190       124        60
OIR    2025250     91400   19.5100 -116.3300       8.3       191       125        60
OIR    2025250     91400   19.5100 -116.3400       8.0       193       126        60
OIR    2025250     91400   19.5100 -116.3500       7.6       198       127        60
OIR    2025250     91400   19.5100 -116.3600       7.3       201       128        60
OIR    2025250     91400   19.5100 -116.3700       7.1       205       128        60
OIR    2025250     91400   19.5100 -116.3800       7.1       206       130        60
OIR    2025250     91400   19.5100 -116.3900       7.0       207       133        60
OIR    2025250     91400   19.5100 -116.4000       6.9       208       137        60
OIR    2025250     91400   19.5100 -116.4100       6.8       209       140        60
OIR    2025250     91400   19.5100 -118.0200       6.7        68       139        60
OIR    2025250     91400   19.5100 -118.0300       6.8        68       137        60
OIR    2025250     91400   19.5100 -118.0400       6.9        68       138        60
OIR    2025250     91400   19.5100 -118.0500       7.1        69       139        60
OIR    2025250     91400   19.5100 -118.0600       7.2        69       139        60
OIR    2025250     91400   19.5100 -118.0700       7.3        69       139        60
OIR    2025250     91400   19.5100 -118.0800       7.8        70       141        60
OIR    2025250     91400   19.5100 -118.0900       8.3        71       142        60
OIR    2025250     91400   19.5000 -112.8500       7.7       173       141        60
OIR    2025250     91400   19.5000 -112.8600       7.7       173       139        60
OIR    2025250     91400   19.5000 -112.8700       7.7       173       138        60
OIR    2025250     91400   19.5000 -112.8800       7.7       173       137        60
OIR    2025250     91400   19.5000 -112.8900       7.8       173       135        60
OIR    2025250     91400   19.5000 -112.9000       7.8       173       133        60
OIR    2025250     91400   19.5000 -112.9100       7.8       173       133        60
OIR    2025250     91400   19.5000 -112.9200       7.8       173       136        60
OIR    2025250     91400   19.5000 -112.9300       7.8       173       136        60
OIR    2025250     91400   19.5000 -112.9400       7.8       173       132        60
OIR    2025250     91400   19.5000 -112.9500       7.8       173       128        60
OIR    2025250     91400   19.5000 -112.9600       7.8       173       130        60
OIR    2025250     91400   19.5000 -112.9700       7.8       173       132        60
OIR    2025250     91400   19.5000 -112.9800       7.8       173       133        60
OIR    2025250     91400   19.5000 -112.9900       7.8       173       134        60
OIR    2025250     91400   19.5000 -113.0000       7.8       173       133        60
OIR    2025250     91400   19.5000 -113.0100       7.8       173       130        60
OIR    2025250     91400   19.5000 -113.0200       7.8       173       127        60
OIR    2025250     91400   19.5000 -113.0300       7.8       173       127        60
OIR    2025250     91400   19.5000 -113.0400       7.8       173       127        60
OIR    2025250     91400   19.5000 -113.0500       7.8       173       130        60
OIR    2025250     91400   19.5000 -113.0600       7.8       173       133        60
OIR    2025250     91400   19.5000 -113.0700       7.8       174       135        60
OIR    2025250     91400   19.5000 -113.0800       7.8       174       130        60
OIR    2025250     91400   19.5000 -113.0900       7.7       174       124        60
OIR    2025250     91400   19.5000 -113.1000       7.7       174       127        60
OIR    2025250     91400   19.5000 -113.1100       7.7       174       130        60
OIR    2025250     91400   19.5000 -113.1200       7.7       174       127        60
OIR    2025250     91400   19.5000 -113.1300       7.7       174       122        60
OIR    2025250     91400   19.5000 -113.1400       7.7       174       120        60
OIR    2025250     91400   19.5000 -113.1500       7.7       174       119        60
OIR    2025250     91400   19.5000 -113.1600       7.7       174       117        60
OIR    2025250     91400   19.5000 -113.1700       7.7       174       116        60
OIR    2025250     91400   19.5000 -113.1800       7.7       174       116        60
OIR    2025250     91400   19.5000 -113.1900       7.7       174       116        60
OIR    2025250     91400   19.5000 -113.2000       7.7       174       115        60
OIR    2025250     91400   19.5000 -113.2100       7.7       174       115        60
OIR    2025250     91400   19.5000 -113.2200       7.8       174       113        60
OIR    2025250     91400   19.5000 -113.2300       7.8       174       112        60
OIR    2025250     91400   19.5000 -113.2400       7.8       174       111        60
OIR    2025250     91400   19.5000 -113.2500       7.8       174       109        60
OIR    2025250     91400   19.5000 -113.2600       7.8       174       109        60
OIR    2025250     91400   19.5000 -113.2700       7.8       174       109        60
OIR    2025250     91400   19.5000 -113.2800       7.8       174       108        60
OIR    2025250     91400   19.5000 -113.2900       7.8       174       107        60
OIR    2025250     91400   19.5000 -113.3000       7.9       173       105        60
OIR    2025250     91400   19.5000 -113.3100       7.9       173       104        60
OIR    2025250     91400   19.5000 -113.3200       7.9       173       104        60
OIR    2025250     91400   19.5000 -113.3300       7.9       173       104        60
OIR    2025250     91400   19.5000 -113.3400       7.9       174       104        60
OIR    2025250     91400   19.5000 -113.3500       8.0       174       104        60
OIR    2025250     91400   19.5000 -113.3600       8.0       174       104        60
OIR    2025250     91400   19.5000 -113.3700       8.0       174       104        60
OIR    2025250     91400   19.5000 -113.3800       8.0       174       104        60
OIR    2025250     91400   19.5000 -113.3900       8.0       174       104        60
OIR    2025250     91400   19.5000 -113.4000       8.1       174       104        60
OIR    2025250     91400   19.5000 -113.4100       8.1       174       104        60
OIR    2025250     91400   19.5000 -113.4200       8.2       174       104        60
OIR    2025250     91400   19.5000 -113.4300       8.2       174       103        60
OIR    2025250     91400   19.5000 -113.4400       8.2       174       103        60
OIR    2025250     91400   19.5000 -113.4500       8.3       174       103        60
OIR    2025250     91400   19.5000 -113.4600       8.3       175       103        60
OIR    2025250     91400   19.5000 -113.4700       8.4       175       103        60
OIR    2025250     91400   19.5000 -113.4800       8.4       175       103        60
OIR    2025250     91400   19.5000 -113.4900       8.5       175       103        60
OIR    2025250     91400   19.5000 -113.5000       8.5       175       103        60
OIR    2025250     91400   19.5000 -113.5100       8.6       175       103        60
OIR    2025250     91400   19.5000 -113.5200       8.6       175       103        60
OIR    2025250     91400   19.5000 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.5000 -113.5400       8.6       176       103        60
OIR    2025250     91400   19.5000 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.5000 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.5000 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.5000 -113.5800       8.7       176       103        60
OIR    2025250     91400   19.5000 -113.5900       8.7       176       104        60
OIR    2025250     91400   19.5000 -113.6000       8.8       176       104        60
OIR    2025250     91400   19.5000 -113.6100       8.8       176       103        60
OIR    2025250     91400   19.5000 -113.6200       8.8       176       103        60
OIR    2025250     91400   19.5000 -113.6300       8.8       177       103        60
OIR    2025250     91400   19.5000 -113.6400       8.8       177       103        60
OIR    2025250     91400   19.5000 -113.6500       8.8       177       103        60
OIR    2025250     91400   19.5000 -113.6600       8.8       177       103        60
OIR    2025250     91400   19.5000 -113.6700       8.8       177       103        60
OIR    2025250     91400   19.5000 -113.6800       8.9       177       103        60
OIR    2025250     91400   19.5000 -113.6900       8.9       177       103        60
OIR    2025250     91400   19.5000 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.5000 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.5000 -113.7200       8.9       177       103        60
OIR    2025250     91400   19.5000 -113.7300       8.9       177       103        60
OIR    2025250     91400   19.5000 -113.7400       8.9       178       103        60
OIR    2025250     91400   19.5000 -113.7500       9.0       178       104        60
OIR    2025250     91400   19.5000 -113.7600       9.0       178       104        60
OIR    2025250     91400   19.5000 -113.7700       9.0       178       104        60
OIR    2025250     91400   19.5000 -113.7800       9.0       178       104        60
OIR    2025250     91400   19.5000 -113.7900       9.0       178       104        60
OIR    2025250     91400   19.5000 -113.8000       9.0       178       105        60
OIR    2025250     91400   19.5000 -113.8100       9.0       178       105        60
OIR    2025250     91400   19.5000 -113.8200       9.1       179       105        60
OIR    2025250     91400   19.5000 -113.8300       9.1       179       105        60
OIR    2025250     91400   19.5000 -113.8400       9.1       179       105        60
OIR    2025250     91400   19.5000 -113.8500       9.1       179       105        60
OIR    2025250     91400   19.5000 -113.8600       9.1       179       105        60
OIR    2025250     91400   19.5000 -113.8700       9.1       179       105        60
OIR    2025250     91400   19.5000 -113.8800       9.1       180       105        60
OIR    2025250     91400   19.5000 -113.8900       9.1       180       105        60
OIR    2025250     91400   19.5000 -113.9000       9.2       180       105        60
OIR    2025250     91400   19.5000 -113.9100       9.2       180       105        60
OIR    2025250     91400   19.5000 -113.9200       9.2       180       105        60
OIR    2025250     91400   19.5000 -113.9300       9.2       181       105        60
OIR    2025250     91400   19.5000 -113.9400       9.3       181       105        60
OIR    2025250     91400   19.5000 -113.9500       9.3       181       105        60
OIR    2025250     91400   19.5000 -113.9600       9.3       181       105        60
OIR    2025250     91400   19.5000 -113.9700       9.3       181       107        60
OIR    2025250     91400   19.5000 -113.9800       9.3       182       107        60
OIR    2025250     91400   19.5000 -113.9900       9.3       182       108        60
OIR    2025250     91400   19.5000 -114.0000       9.3       182       108        60
OIR    2025250     91400   19.5000 -114.0100       9.3       182       108        60
OIR    2025250     91400   19.5000 -114.0200       9.3       183       108        60
OIR    2025250     91400   19.5000 -114.0300       9.3       183       107        60
OIR    2025250     91400   19.5000 -114.0400       9.3       183       107        60
OIR    2025250     91400   19.5000 -114.0500       9.3       184       107        60
OIR    2025250     91400   19.5000 -114.0600       9.3       184       107        60
OIR    2025250     91400   19.5000 -114.0700       9.3       184       107        60
OIR    2025250     91400   19.5000 -114.0800       9.3       184       108        60
OIR    2025250     91400   19.5000 -114.0900       9.3       185       108        60
OIR    2025250     91400   19.5000 -114.1000       9.2       185       107        60
OIR    2025250     91400   19.5000 -114.1100       9.2       186       107        60
OIR    2025250     91400   19.5000 -114.1200       9.2       186       107        60
OIR    2025250     91400   19.5000 -114.1300       9.2       186       105        60
OIR    2025250     91400   19.5000 -114.1400       9.2       186       105        60
OIR    2025250     91400   19.5000 -114.1500       9.2       187       107        60
OIR    2025250     91400   19.5000 -114.1600       9.1       187       107        60
OIR    2025250     91400   19.5000 -114.1700       9.1       188       108        60
OIR    2025250     91400   19.5000 -114.1800       9.0       189       109        60
OIR    2025250     91400   19.5000 -114.1900       9.0       189       109        60
OIR    2025250     91400   19.5000 -114.2000       9.0       190       110        60
OIR    2025250     91400   19.5000 -114.2100       8.9       191       110        60
OIR    2025250     91400   19.5000 -114.2200       8.8       192       110        60
OIR    2025250     91400   19.5000 -114.2300       8.7       194       110        60
OIR    2025250     91400   19.5000 -114.2400       8.6       198       109        60
OIR    2025250     91400   19.5000 -114.2500       8.5       200       110        60
OIR    2025250     91400   19.5000 -114.2600       8.4       203       111        60
OIR    2025250     91400   19.5000 -114.2700       8.3       204       112        60
OIR    2025250     91400   19.5000 -114.2800       8.3       206       113        60
OIR    2025250     91400   19.5000 -114.2900       8.3       210       114        60
OIR    2025250     91400   19.5000 -114.3000       8.3       214       113        60
OIR    2025250     91400   19.5000 -114.3100       8.3       216       113        60
OIR    2025250     91400   19.5000 -114.3200       8.3       217       114        60
OIR    2025250     91400   19.5000 -114.3300       8.4       217       115        60
OIR    2025250     91400   19.5000 -114.3400       8.4       218       115        60
OIR    2025250     91400   19.5000 -114.3500       8.4       218       116        60
OIR    2025250     91400   19.5000 -114.3600       8.4       219       116        60
OIR    2025250     91400   19.5000 -114.3700       8.4       219       116        60
OIR    2025250     91400   19.5000 -114.3800       8.4       220       116        60
OIR    2025250     91400   19.5000 -114.3900       8.4       220       116        60
OIR    2025250     91400   19.5000 -114.4000       8.4       220       119        60
OIR    2025250     91400   19.5000 -114.4100       8.4       220       123        60
OIR    2025250     91400   19.5000 -114.4200       8.4       220       127        60
OIR    2025250     91400   19.5000 -114.4300       8.3       220       128        60
OIR    2025250     91400   19.5000 -114.4400       8.3       220       129        60
OIR    2025250     91400   19.5000 -114.4500       8.3       219       130        60
OIR    2025250     91400   19.5000 -114.4600       8.3       219       130        60
OIR    2025250     91400   19.5000 -114.4700       8.2       218       131        60
OIR    2025250     91400   19.5000 -114.4800       8.0       216       131        60
OIR    2025250     91400   19.5000 -114.4900       7.9       214       132        60
OIR    2025250     91400   19.5000 -114.5000       7.7       213       131        60
OIR    2025250     91400   19.5000 -114.5100       7.6       211       130        60
OIR    2025250     91400   19.5000 -114.5200       7.3       207       130        60
OIR    2025250     91400   19.5000 -114.5300       7.0       201       129        60
OIR    2025250     91400   19.5000 -114.5400       6.7       190       129        60
OIR    2025250     91400   19.5000 -114.5500       6.7       179       128        60
OIR    2025250     91400   19.5000 -114.5600       6.7       175       128        60
OIR    2025250     91400   19.5000 -114.5700       6.7       173       128        60
OIR    2025250     91400   19.5000 -114.5800       6.7       172       128        60
OIR    2025250     91400   19.5000 -114.5900       6.7       171       130        60
OIR    2025250     91400   19.5000 -114.6000       6.7       170       132        60
OIR    2025250     91400   19.5000 -114.6100       6.7       170       133        60
OIR    2025250     91400   19.5000 -114.6200       6.7       170       134        60
OIR    2025250     91400   19.5000 -114.6300       6.7       170       136        60
OIR    2025250     91400   19.5000 -114.6400       6.7       169       137        60
OIR    2025250     91400   19.5000 -114.6500       6.7       169       139        60
OIR    2025250     91400   19.5000 -114.6600       6.8       168       140        60
OIR    2025250     91400   19.5000 -114.6700       6.9       167       140        60
OIR    2025250     91400   19.5000 -115.9300      10.2       187       142        60
OIR    2025250     91400   19.5000 -115.9400      10.3       186       141        60
OIR    2025250     91400   19.5000 -115.9500      10.4       184       140        60
OIR    2025250     91400   19.5000 -115.9600      10.5       182       139        60
OIR    2025250     91400   19.5000 -115.9700      10.5       181       139        60
OIR    2025250     91400   19.5000 -115.9800      10.5       180       139        60
OIR    2025250     91400   19.5000 -115.9900      10.5       179       140        60
OIR    2025250     91400   19.5000 -116.0000      10.4       179       142        60
OIR    2025250     91400   19.5000 -116.2000       9.8       184       140        60
OIR    2025250     91400   19.5000 -116.2100       9.5       186       138        60
OIR    2025250     91400   19.5000 -116.2200       9.1       188       136        60
OIR    2025250     91400   19.5000 -116.2300       9.0       189       134        60
OIR    2025250     91400   19.5000 -116.2400       8.8       189       131        60
OIR    2025250     91400   19.5000 -116.2500       8.8       189       129        60
OIR    2025250     91400   19.5000 -116.2600       8.8       189       128        60
OIR    2025250     91400   19.5000 -116.2700       8.7       189       126        60
OIR    2025250     91400   19.5000 -116.2800       8.7       189       125        60
OIR    2025250     91400   19.5000 -116.2900       8.6       190       124        60
OIR    2025250     91400   19.5000 -116.3000       8.6       190       124        60
OIR    2025250     91400   19.5000 -116.3100       8.5       190       124        60
OIR    2025250     91400   19.5000 -116.3200       8.5       190       124        60
OIR    2025250     91400   19.5000 -116.3300       8.3       191       124        60
OIR    2025250     91400   19.5000 -116.3400       8.0       193       125        60
OIR    2025250     91400   19.5000 -116.3500       7.7       197       126        60
OIR    2025250     91400   19.5000 -116.3600       7.3       200       128        60
OIR    2025250     91400   19.5000 -116.3700       7.0       203       128        60
OIR    2025250     91400   19.5000 -116.3800       6.9       206       130        60
OIR    2025250     91400   19.5000 -116.3900       6.8       208       133        60
OIR    2025250     91400   19.5000 -116.4000       6.7       209       137        60
OIR    2025250     91400   19.5000 -116.4100       6.5       211       141        60
OIR    2025250     91400   19.5000 -118.0200       6.7        68       142        60
OIR    2025250     91400   19.5000 -118.0300       6.7        68       137        60
OIR    2025250     91400   19.5000 -118.0400       6.8        68       139        60
OIR    2025250     91400   19.5000 -118.0500       7.1        68       140        60
OIR    2025250     91400   19.5000 -118.0600       7.2        69       138        60
OIR    2025250     91400   19.5000 -118.0700       7.4        69       138        60
OIR    2025250     91400   19.5000 -118.0800       7.9        70       141        60
OIR    2025250     91400   19.4900 -112.8600       7.7       173       140        60
OIR    2025250     91400   19.4900 -112.8700       7.7       173       139        60
OIR    2025250     91400   19.4900 -112.8800       7.7       173       138        60
OIR    2025250     91400   19.4900 -112.8900       7.8       173       136        60
OIR    2025250     91400   19.4900 -112.9000       7.8       173       134        60
OIR    2025250     91400   19.4900 -112.9100       7.8       173       132        60
OIR    2025250     91400   19.4900 -112.9200       7.8       173       133        60
OIR    2025250     91400   19.4900 -112.9300       7.8       173       134        60
OIR    2025250     91400   19.4900 -112.9400       7.8       173       132        60
OIR    2025250     91400   19.4900 -112.9500       7.8       173       131        60
OIR    2025250     91400   19.4900 -112.9600       7.8       173       132        60
OIR    2025250     91400   19.4900 -112.9700       7.8       173       134        60
OIR    2025250     91400   19.4900 -112.9800       7.8       173       135        60
OIR    2025250     91400   19.4900 -112.9900       7.8       173       135        60
OIR    2025250     91400   19.4900 -113.0000       7.8       173       135        60
OIR    2025250     91400   19.4900 -113.0100       7.8       173       132        60
OIR    2025250     91400   19.4900 -113.0200       7.8       173       129        60
OIR    2025250     91400   19.4900 -113.0300       7.8       173       128        60
OIR    2025250     91400   19.4900 -113.0400       7.8       173       128        60
OIR    2025250     91400   19.4900 -113.0500       7.8       173       129        60
OIR    2025250     91400   19.4900 -113.0600       7.8       174       130        60
OIR    2025250     91400   19.4900 -113.0700       7.8       174       132        60
OIR    2025250     91400   19.4900 -113.0800       7.8       174       129        60
OIR    2025250     91400   19.4900 -113.0900       7.7       174       126        60
OIR    2025250     91400   19.4900 -113.1000       7.7       174       126        60
OIR    2025250     91400   19.4900 -113.1100       7.7       174       128        60
OIR    2025250     91400   19.4900 -113.1200       7.7       174       127        60
OIR    2025250     91400   19.4900 -113.1300       7.7       174       123        60
OIR    2025250     91400   19.4900 -113.1400       7.7       174       120        60
OIR    2025250     91400   19.4900 -113.1500       7.7       174       119        60
OIR    2025250     91400   19.4900 -113.1600       7.7       174       117        60
OIR    2025250     91400   19.4900 -113.1700       7.7       174       116        60
OIR    2025250     91400   19.4900 -113.1800       7.7       174       116        60
OIR    2025250     91400   19.4900 -113.1900       7.7       174       116        60
OIR    2025250     91400   19.4900 -113.2000       7.7       174       116        60
OIR    2025250     91400   19.4900 -113.2100       7.8       174       115        60
OIR    2025250     91400   19.4900 -113.2200       7.8       174       114        60
OIR    2025250     91400   19.4900 -113.2300       7.8       174       112        60
OIR    2025250     91400   19.4900 -113.2400       7.8       174       111        60
OIR    2025250     91400   19.4900 -113.2500       7.8       174       110        60
OIR    2025250     91400   19.4900 -113.2600       7.8       174       109        60
OIR    2025250     91400   19.4900 -113.2700       7.8       174       109        60
OIR    2025250     91400   19.4900 -113.2800       7.8       174       109        60
OIR    2025250     91400   19.4900 -113.2900       7.9       174       107        60
OIR    2025250     91400   19.4900 -113.3000       7.9       174       105        60
OIR    2025250     91400   19.4900 -113.3100       7.9       174       104        60
OIR    2025250     91400   19.4900 -113.3200       7.9       174       104        60
OIR    2025250     91400   19.4900 -113.3300       7.9       174       104        60
OIR    2025250     91400   19.4900 -113.3400       7.9       174       104        60
OIR    2025250     91400   19.4900 -113.3500       8.0       174       104        60
OIR    2025250     91400   19.4900 -113.3600       8.0       174       104        60
OIR    2025250     91400   19.4900 -113.3700       8.0       174       104        60
OIR    2025250     91400   19.4900 -113.3800       8.0       174       104        60
OIR    2025250     91400   19.4900 -113.3900       8.0       174       104        60
OIR    2025250     91400   19.4900 -113.4000       8.1       174       104        60
OIR    2025250     91400   19.4900 -113.4100       8.1       174       103        60
OIR    2025250     91400   19.4900 -113.4200       8.2       174       103        60
OIR    2025250     91400   19.4900 -113.4300       8.2       174       103        60
OIR    2025250     91400   19.4900 -113.4400       8.2       175       103        60
OIR    2025250     91400   19.4900 -113.4500       8.3       175       103        60
OIR    2025250     91400   19.4900 -113.4600       8.3       175       104        60
OIR    2025250     91400   19.4900 -113.4700       8.4       175       103        60
OIR    2025250     91400   19.4900 -113.4800       8.4       175       103        60
OIR    2025250     91400   19.4900 -113.4900       8.5       175       103        60
OIR    2025250     91400   19.4900 -113.5000       8.5       175       103        60
OIR    2025250     91400   19.4900 -113.5100       8.6       175       103        60
OIR    2025250     91400   19.4900 -113.5200       8.6       176       103        60
OIR    2025250     91400   19.4900 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.4900 -113.5400       8.6       176       103        60
OIR    2025250     91400   19.4900 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.4900 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.4900 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.4900 -113.5800       8.7       176       103        60
OIR    2025250     91400   19.4900 -113.5900       8.7       176       103        60
OIR    2025250     91400   19.4900 -113.6000       8.8       176       103        60
OIR    2025250     91400   19.4900 -113.6100       8.8       176       103        60
OIR    2025250     91400   19.4900 -113.6200       8.8       177       103        60
OIR    2025250     91400   19.4900 -113.6300       8.8       177       103        60
OIR    2025250     91400   19.4900 -113.6400       8.8       177       103        60
OIR    2025250     91400   19.4900 -113.6500       8.8       177       103        60
OIR    2025250     91400   19.4900 -113.6600       8.8       177       103        60
OIR    2025250     91400   19.4900 -113.6700       8.9       177       103        60
OIR    2025250     91400   19.4900 -113.6800       8.9       177       103        60
OIR    2025250     91400   19.4900 -113.6900       8.9       177       103        60
OIR    2025250     91400   19.4900 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.4900 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.4900 -113.7200       8.9       177       103        60
OIR    2025250     91400   19.4900 -113.7300       8.9       177       103        60
OIR    2025250     91400   19.4900 -113.7400       8.9       178       103        60
OIR    2025250     91400   19.4900 -113.7500       9.0       178       104        60
OIR    2025250     91400   19.4900 -113.7600       9.0       178       104        60
OIR    2025250     91400   19.4900 -113.7700       9.0       178       104        60
OIR    2025250     91400   19.4900 -113.7800       9.0       178       104        60
OIR    2025250     91400   19.4900 -113.7900       9.0       178       104        60
OIR    2025250     91400   19.4900 -113.8000       9.0       178       104        60
OIR    2025250     91400   19.4900 -113.8100       9.0       179       105        60
OIR    2025250     91400   19.4900 -113.8200       9.1       179       105        60
OIR    2025250     91400   19.4900 -113.8300       9.1       179       105        60
OIR    2025250     91400   19.4900 -113.8400       9.1       179       105        60
OIR    2025250     91400   19.4900 -113.8500       9.1       179       105        60
OIR    2025250     91400   19.4900 -113.8600       9.1       179       105        60
OIR    2025250     91400   19.4900 -113.8700       9.1       180       105        60
OIR    2025250     91400   19.4900 -113.8800       9.1       180       105        60
OIR    2025250     91400   19.4900 -113.8900       9.1       180       107        60
OIR    2025250     91400   19.4900 -113.9000       9.2       180       107        60
OIR    2025250     91400   19.4900 -113.9100       9.2       180       105        60
OIR    2025250     91400   19.4900 -113.9200       9.2       181       105        60
OIR    2025250     91400   19.4900 -113.9300       9.3       181       105        60
OIR    2025250     91400   19.4900 -113.9400       9.3       181       105        60
OIR    2025250     91400   19.4900 -113.9500       9.3       181       105        60
OIR    2025250     91400   19.4900 -113.9600       9.3       181       105        60
OIR    2025250     91400   19.4900 -113.9700       9.3       181       107        60
OIR    2025250     91400   19.4900 -113.9800       9.3       182       108        60
OIR    2025250     91400   19.4900 -113.9900       9.3       182       108        60
OIR    2025250     91400   19.4900 -114.0000       9.3       182       109        60
OIR    2025250     91400   19.4900 -114.0100       9.3       182       109        60
OIR    2025250     91400   19.4900 -114.0200       9.4       183       108        60
OIR    2025250     91400   19.4900 -114.0300       9.4       183       107        60
OIR    2025250     91400   19.4900 -114.0400       9.4       183       107        60
OIR    2025250     91400   19.4900 -114.0500       9.4       184       107        60
OIR    2025250     91400   19.4900 -114.0600       9.4       184       107        60
OIR    2025250     91400   19.4900 -114.0700       9.3       184       108        60
OIR    2025250     91400   19.4900 -114.0800       9.3       184       108        60
OIR    2025250     91400   19.4900 -114.0900       9.3       185       108        60
OIR    2025250     91400   19.4900 -114.1000       9.3       185       107        60
OIR    2025250     91400   19.4900 -114.1100       9.3       186       107        60
OIR    2025250     91400   19.4900 -114.1200       9.2       186       105        60
OIR    2025250     91400   19.4900 -114.1300       9.2       186       105        60
OIR    2025250     91400   19.4900 -114.1400       9.2       186       105        60
OIR    2025250     91400   19.4900 -114.1500       9.2       187       105        60
OIR    2025250     91400   19.4900 -114.1600       9.2       187       107        60
OIR    2025250     91400   19.4900 -114.1700       9.2       188       108        60
OIR    2025250     91400   19.4900 -114.1800       9.1       188       109        60
OIR    2025250     91400   19.4900 -114.1900       9.1       189       109        60
OIR    2025250     91400   19.4900 -114.2000       9.1       190       109        60
OIR    2025250     91400   19.4900 -114.2100       9.0       191       110        60
OIR    2025250     91400   19.4900 -114.2200       8.9       192       110        60
OIR    2025250     91400   19.4900 -114.2300       8.9       193       111        60
OIR    2025250     91400   19.4900 -114.2400       8.7       196       111        60
OIR    2025250     91400   19.4900 -114.2500       8.6       199       111        60
OIR    2025250     91400   19.4900 -114.2600       8.5       202       111        60
OIR    2025250     91400   19.4900 -114.2700       8.4       203       111        60
OIR    2025250     91400   19.4900 -114.2800       8.3       205       112        60
OIR    2025250     91400   19.4900 -114.2900       8.3       209       113        60
OIR    2025250     91400   19.4900 -114.3000       8.3       213       113        60
OIR    2025250     91400   19.4900 -114.3100       8.3       216       113        60
OIR    2025250     91400   19.4900 -114.3200       8.3       217       114        60
OIR    2025250     91400   19.4900 -114.3300       8.3       217       115        60
OIR    2025250     91400   19.4900 -114.3400       8.3       218       115        60
OIR    2025250     91400   19.4900 -114.3500       8.3       218       114        60
OIR    2025250     91400   19.4900 -114.3600       8.4       219       115        60
OIR    2025250     91400   19.4900 -114.3700       8.4       219       116        60
OIR    2025250     91400   19.4900 -114.3800       8.4       219       117        60
OIR    2025250     91400   19.4900 -114.3900       8.4       220       120        60
OIR    2025250     91400   19.4900 -114.4000       8.3       220       121        60
OIR    2025250     91400   19.4900 -114.4100       8.3       220       124        60
OIR    2025250     91400   19.4900 -114.4200       8.3       220       128        60
OIR    2025250     91400   19.4900 -114.4300       8.3       220       128        60
OIR    2025250     91400   19.4900 -114.4400       8.3       219       128        60
OIR    2025250     91400   19.4900 -114.4500       8.3       219       129        60
OIR    2025250     91400   19.4900 -114.4600       8.2       218       131        60
OIR    2025250     91400   19.4900 -114.4700       8.1       217       132        60
OIR    2025250     91400   19.4900 -114.4800       8.0       215       131        60
OIR    2025250     91400   19.4900 -114.4900       7.9       214       130        60
OIR    2025250     91400   19.4900 -114.5000       7.7       212       130        60
OIR    2025250     91400   19.4900 -114.5100       7.6       210       130        60
OIR    2025250     91400   19.4900 -114.5200       7.4       206       130        60
OIR    2025250     91400   19.4900 -114.5300       7.1       198       129        60
OIR    2025250     91400   19.4900 -114.5400       6.8       188       129        60
OIR    2025250     91400   19.4900 -114.5500       6.8       178       128        60
OIR    2025250     91400   19.4900 -114.5600       6.8       175       128        60
OIR    2025250     91400   19.4900 -114.5700       6.8       173       128        60
OIR    2025250     91400   19.4900 -114.5800       6.7       172       129        60
OIR    2025250     91400   19.4900 -114.5900       6.7       171       130        60
OIR    2025250     91400   19.4900 -114.6000       6.7       170       131        60
OIR    2025250     91400   19.4900 -114.6100       6.7       170       133        60
OIR    2025250     91400   19.4900 -114.6200       6.7       170       134        60
OIR    2025250     91400   19.4900 -114.6300       6.7       170       136        60
OIR    2025250     91400   19.4900 -114.6400       6.7       170       138        60
OIR    2025250     91400   19.4900 -115.9500      10.4       184       141        60
OIR    2025250     91400   19.4900 -115.9600      10.5       183       140        60
OIR    2025250     91400   19.4900 -115.9700      10.5       182       141        60
OIR    2025250     91400   19.4900 -115.9800      10.5       182       141        60
OIR    2025250     91400   19.4900 -115.9900      10.4       181       140        60
OIR    2025250     91400   19.4900 -116.0000      10.4       180       139        60
OIR    2025250     91400   19.4900 -116.0100      10.3       179       141        60
OIR    2025250     91400   19.4900 -116.2000       9.9       184       141        60
OIR    2025250     91400   19.4900 -116.2100       9.6       186       138        60
OIR    2025250     91400   19.4900 -116.2200       9.3       187       135        60
OIR    2025250     91400   19.4900 -116.2300       9.0       188       133        60
OIR    2025250     91400   19.4900 -116.2400       8.9       189       131        60
OIR    2025250     91400   19.4900 -116.2500       8.8       189       129        60
OIR    2025250     91400   19.4900 -116.2600       8.8       189       128        60
OIR    2025250     91400   19.4900 -116.2700       8.8       189       126        60
OIR    2025250     91400   19.4900 -116.2800       8.8       189       126        60
OIR    2025250     91400   19.4900 -116.2900       8.7       189       125        60
OIR    2025250     91400   19.4900 -116.3000       8.6       189       125        60
OIR    2025250     91400   19.4900 -116.3100       8.6       190       125        60
OIR    2025250     91400   19.4900 -116.3200       8.5       190       125        60
OIR    2025250     91400   19.4900 -116.3300       8.4       191       125        60
OIR    2025250     91400   19.4900 -116.3400       8.1       193       126        60
OIR    2025250     91400   19.4900 -116.3500       7.7       196       128        60
OIR    2025250     91400   19.4900 -116.3600       7.2       199       129        60
OIR    2025250     91400   19.4900 -116.3700       6.8       202       131        60
OIR    2025250     91400   19.4900 -116.3800       6.5       206       132        60
OIR    2025250     91400   19.4900 -116.3900       6.2       212       135        60
OIR    2025250     91400   19.4900 -116.4000       5.8       217       139        60
OIR    2025250     91400   19.4900 -118.0300       6.7        68       140        60
OIR    2025250     91400   19.4900 -118.0400       6.8        68       140        60
OIR    2025250     91400   19.4900 -118.0500       7.0        69       140        60
OIR    2025250     91400   19.4900 -118.0600       7.1        69       140        60
OIR    2025250     91400   19.4900 -118.0700       7.4        69       140        60
OIR    2025250     91400   19.4900 -118.0800       8.0        71       142        60
OIR    2025250     91400   19.4800 -110.7600       9.8       113       135        60
OIR    2025250     91400   19.4800 -112.8700       7.7       173       140        60
OIR    2025250     91400   19.4800 -112.8800       7.7       173       138        60
OIR    2025250     91400   19.4800 -112.8900       7.8       173       136        60
OIR    2025250     91400   19.4800 -112.9000       7.8       173       135        60
OIR    2025250     91400   19.4800 -112.9100       7.8       173       133        60
OIR    2025250     91400   19.4800 -112.9200       7.8       173       132        60
OIR    2025250     91400   19.4800 -112.9300       7.8       173       132        60
OIR    2025250     91400   19.4800 -112.9400       7.8       173       132        60
OIR    2025250     91400   19.4800 -112.9500       7.8       173       132        60
OIR    2025250     91400   19.4800 -112.9600       7.8       173       133        60
OIR    2025250     91400   19.4800 -112.9700       7.8       173       136        60
OIR    2025250     91400   19.4800 -112.9800       7.8       173       137        60
OIR    2025250     91400   19.4800 -112.9900       7.8       173       137        60
OIR    2025250     91400   19.4800 -113.0000       7.8       173       137        60
OIR    2025250     91400   19.4800 -113.0100       7.8       173       134        60
OIR    2025250     91400   19.4800 -113.0200       7.8       173       130        60
OIR    2025250     91400   19.4800 -113.0300       7.8       173       129        60
OIR    2025250     91400   19.4800 -113.0400       7.8       174       129        60
OIR    2025250     91400   19.4800 -113.0500       7.8       174       128        60
OIR    2025250     91400   19.4800 -113.0600       7.8       174       127        60
OIR    2025250     91400   19.4800 -113.0700       7.8       174       127        60
OIR    2025250     91400   19.4800 -113.0800       7.8       174       126        60
OIR    2025250     91400   19.4800 -113.0900       7.7       174       125        60
OIR    2025250     91400   19.4800 -113.1000       7.7       174       124        60
OIR    2025250     91400   19.4800 -113.1100       7.7       174       124        60
OIR    2025250     91400   19.4800 -113.1200       7.7       174       123        60
OIR    2025250     91400   19.4800 -113.1300       7.7       174       121        60
OIR    2025250     91400   19.4800 -113.1400       7.7       174       119        60
OIR    2025250     91400   19.4800 -113.1500       7.7       174       117        60
OIR    2025250     91400   19.4800 -113.1600       7.7       174       117        60
OIR    2025250     91400   19.4800 -113.1700       7.7       174       116        60
OIR    2025250     91400   19.4800 -113.1800       7.7       174       116        60
OIR    2025250     91400   19.4800 -113.1900       7.7       174       115        60
OIR    2025250     91400   19.4800 -113.2000       7.8       174       115        60
OIR    2025250     91400   19.4800 -113.2100       7.8       174       114        60
OIR    2025250     91400   19.4800 -113.2200       7.8       174       113        60
OIR    2025250     91400   19.4800 -113.2300       7.8       174       112        60
OIR    2025250     91400   19.4800 -113.2400       7.8       174       111        60
OIR    2025250     91400   19.4800 -113.2500       7.8       174       111        60
OIR    2025250     91400   19.4800 -113.2600       7.8       174       110        60
OIR    2025250     91400   19.4800 -113.2700       7.8       174       109        60
OIR    2025250     91400   19.4800 -113.2800       7.8       174       108        60
OIR    2025250     91400   19.4800 -113.2900       7.9       174       108        60
OIR    2025250     91400   19.4800 -113.3000       7.9       174       108        60
OIR    2025250     91400   19.4800 -113.3100       7.9       174       105        60
OIR    2025250     91400   19.4800 -113.3200       7.9       174       104        60
OIR    2025250     91400   19.4800 -113.3300       7.9       174       104        60
OIR    2025250     91400   19.4800 -113.3400       7.9       174       104        60
OIR    2025250     91400   19.4800 -113.3500       8.0       174       104        60
OIR    2025250     91400   19.4800 -113.3600       8.0       174       104        60
OIR    2025250     91400   19.4800 -113.3700       8.0       174       104        60
OIR    2025250     91400   19.4800 -113.3800       8.0       174       104        60
OIR    2025250     91400   19.4800 -113.3900       8.1       174       104        60
OIR    2025250     91400   19.4800 -113.4000       8.1       174       104        60
OIR    2025250     91400   19.4800 -113.4100       8.1       174       103        60
OIR    2025250     91400   19.4800 -113.4200       8.2       175       103        60
OIR    2025250     91400   19.4800 -113.4300       8.2       175       103        60
OIR    2025250     91400   19.4800 -113.4400       8.3       175       103        60
OIR    2025250     91400   19.4800 -113.4500       8.3       175       103        60
OIR    2025250     91400   19.4800 -113.4600       8.3       175       104        60
OIR    2025250     91400   19.4800 -113.4700       8.4       175       104        60
OIR    2025250     91400   19.4800 -113.4800       8.4       175       103        60
OIR    2025250     91400   19.4800 -113.4900       8.5       175       103        60
OIR    2025250     91400   19.4800 -113.5000       8.5       175       103        60
OIR    2025250     91400   19.4800 -113.5100       8.6       176       103        60
OIR    2025250     91400   19.4800 -113.5200       8.6       176       103        60
OIR    2025250     91400   19.4800 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.4800 -113.5400       8.6       176       103        60
OIR    2025250     91400   19.4800 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.4800 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.4800 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.4800 -113.5800       8.7       176       103        60
OIR    2025250     91400   19.4800 -113.5900       8.7       176       103        60
OIR    2025250     91400   19.4800 -113.6000       8.8       176       103        60
OIR    2025250     91400   19.4800 -113.6100       8.8       177       103        60
OIR    2025250     91400   19.4800 -113.6200       8.8       177       103        60
OIR    2025250     91400   19.4800 -113.6300       8.8       177       103        60
OIR    2025250     91400   19.4800 -113.6400       8.8       177       103        60
OIR    2025250     91400   19.4800 -113.6500       8.8       177       103        60
OIR    2025250     91400   19.4800 -113.6600       8.8       177       103        60
OIR    2025250     91400   19.4800 -113.6700       8.9       177       103        60
OIR    2025250     91400   19.4800 -113.6800       8.9       177       103        60
OIR    2025250     91400   19.4800 -113.6900       8.9       177       103        60
OIR    2025250     91400   19.4800 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.4800 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.4800 -113.7200       8.9       177       103        60
OIR    2025250     91400   19.4800 -113.7300       8.9       178       103        60
OIR    2025250     91400   19.4800 -113.7400       9.0       178       103        60
OIR    2025250     91400   19.4800 -113.7500       9.0       178       104        60
OIR    2025250     91400   19.4800 -113.7600       9.0       178       104        60
OIR    2025250     91400   19.4800 -113.7700       9.0       178       104        60
OIR    2025250     91400   19.4800 -113.7800       9.0       178       104        60
OIR    2025250     91400   19.4800 -113.7900       9.0       178       104        60
OIR    2025250     91400   19.4800 -113.8000       9.0       178       105        60
OIR    2025250     91400   19.4800 -113.8100       9.1       179       105        60
OIR    2025250     91400   19.4800 -113.8200       9.1       179       105        60
OIR    2025250     91400   19.4800 -113.8300       9.1       179       105        60
OIR    2025250     91400   19.4800 -113.8400       9.1       179       107        60
OIR    2025250     91400   19.4800 -113.8500       9.1       179       107        60
OIR    2025250     91400   19.4800 -113.8600       9.1       179       107        60
OIR    2025250     91400   19.4800 -113.8700       9.1       180       107        60
OIR    2025250     91400   19.4800 -113.8800       9.1       180       107        60
OIR    2025250     91400   19.4800 -113.8900       9.2       180       107        60
OIR    2025250     91400   19.4800 -113.9000       9.2       180       107        60
OIR    2025250     91400   19.4800 -113.9100       9.2       180       107        60
OIR    2025250     91400   19.4800 -113.9200       9.3       181       105        60
OIR    2025250     91400   19.4800 -113.9300       9.3       181       105        60
OIR    2025250     91400   19.4800 -113.9400       9.3       181       107        60
OIR    2025250     91400   19.4800 -113.9500       9.3       181       107        60
OIR    2025250     91400   19.4800 -113.9600       9.3       181       107        60
OIR    2025250     91400   19.4800 -113.9700       9.3       182       107        60
OIR    2025250     91400   19.4800 -113.9800       9.3       182       108        60
OIR    2025250     91400   19.4800 -113.9900       9.3       182       108        60
OIR    2025250     91400   19.4800 -114.0000       9.4       182       108        60
OIR    2025250     91400   19.4800 -114.0100       9.4       182       109        60
OIR    2025250     91400   19.4800 -114.0200       9.4       183       108        60
OIR    2025250     91400   19.4800 -114.0300       9.4       183       108        60
OIR    2025250     91400   19.4800 -114.0400       9.4       183       107        60
OIR    2025250     91400   19.4800 -114.0500       9.4       184       107        60
OIR    2025250     91400   19.4800 -114.0600       9.4       184       107        60
OIR    2025250     91400   19.4800 -114.0700       9.4       184       108        60
OIR    2025250     91400   19.4800 -114.0800       9.4       184       108        60
OIR    2025250     91400   19.4800 -114.0900       9.3       185       108        60
OIR    2025250     91400   19.4800 -114.1000       9.3       185       107        60
OIR    2025250     91400   19.4800 -114.1100       9.3       185       107        60
OIR    2025250     91400   19.4800 -114.1200       9.3       186       107        60
OIR    2025250     91400   19.4800 -114.1300       9.3       186       105        60
OIR    2025250     91400   19.4800 -114.1400       9.3       186       105        60
OIR    2025250     91400   19.4800 -114.1500       9.3       187       105        60
OIR    2025250     91400   19.4800 -114.1600       9.3       187       107        60
OIR    2025250     91400   19.4800 -114.1700       9.2       188       108        60
OIR    2025250     91400   19.4800 -114.1800       9.2       188       109        60
OIR    2025250     91400   19.4800 -114.1900       9.2       189       109        60
OIR    2025250     91400   19.4800 -114.2000       9.2       190       109        60
OIR    2025250     91400   19.4800 -114.2100       9.1       190       110        60
OIR    2025250     91400   19.4800 -114.2200       9.1       191       111        60
OIR    2025250     91400   19.4800 -114.2300       9.0       193       111        60
OIR    2025250     91400   19.4800 -114.2400       8.9       195       111        60
OIR    2025250     91400   19.4800 -114.2500       8.8       197       111        60
OIR    2025250     91400   19.4800 -114.2600       8.6       200       111        60
OIR    2025250     91400   19.4800 -114.2700       8.5       202       111        60
OIR    2025250     91400   19.4800 -114.2800       8.4       204       111        60
OIR    2025250     91400   19.4800 -114.2900       8.3       208       111        60
OIR    2025250     91400   19.4800 -114.3000       8.3       213       112        60
OIR    2025250     91400   19.4800 -114.3100       8.3       216       113        60
OIR    2025250     91400   19.4800 -114.3200       8.3       217       114        60
OIR    2025250     91400   19.4800 -114.3300       8.3       217       115        60
OIR    2025250     91400   19.4800 -114.3400       8.3       218       114        60
OIR    2025250     91400   19.4800 -114.3500       8.3       218       113        60
OIR    2025250     91400   19.4800 -114.3600       8.3       219       114        60
OIR    2025250     91400   19.4800 -114.3700       8.3       219       116        60
OIR    2025250     91400   19.4800 -114.3800       8.3       219       120        60
OIR    2025250     91400   19.4800 -114.3900       8.3       219       123        60
OIR    2025250     91400   19.4800 -114.4000       8.3       220       125        60
OIR    2025250     91400   19.4800 -114.4100       8.3       219       127        60
OIR    2025250     91400   19.4800 -114.4200       8.3       219       129        60
OIR    2025250     91400   19.4800 -114.4300       8.3       219       129        60
OIR    2025250     91400   19.4800 -114.4400       8.3       219       126        60
OIR    2025250     91400   19.4800 -114.4500       8.2       218       125        60
OIR    2025250     91400   19.4800 -114.4600       8.1       217       128        60
OIR    2025250     91400   19.4800 -114.4700       8.1       216       131        60
OIR    2025250     91400   19.4800 -114.4800       8.0       215       129        60
OIR    2025250     91400   19.4800 -114.4900       7.8       213       127        60
OIR    2025250     91400   19.4800 -114.5000       7.7       211       127        60
OIR    2025250     91400   19.4800 -114.5100       7.6       208       128        60
OIR    2025250     91400   19.4800 -114.5200       7.4       203       129        60
OIR    2025250     91400   19.4800 -114.5300       7.2       195       128        60
OIR    2025250     91400   19.4800 -114.5400       7.1       186       126        60
OIR    2025250     91400   19.4800 -114.5500       7.0       178       129        60
OIR    2025250     91400   19.4800 -114.5600       6.9       175       131        60
OIR    2025250     91400   19.4800 -114.5700       6.8       173       131        60
OIR    2025250     91400   19.4800 -114.5800       6.8       172       131        60
OIR    2025250     91400   19.4800 -114.5900       6.7       171       130        60
OIR    2025250     91400   19.4800 -114.6000       6.7       171       128        60
OIR    2025250     91400   19.4800 -114.6100       6.7       170       128        60
OIR    2025250     91400   19.4800 -114.6200       6.7       170       133        60
OIR    2025250     91400   19.4800 -114.6300       6.7       170       137        60
OIR    2025250     91400   19.4800 -114.6400       6.7       170       138        60
OIR    2025250     91400   19.4800 -114.6500       6.7       168       140        60
OIR    2025250     91400   19.4800 -116.2000       9.9       184       141        60
OIR    2025250     91400   19.4800 -116.2100       9.8       185       139        60
OIR    2025250     91400   19.4800 -116.2200       9.6       186       136        60
OIR    2025250     91400   19.4800 -116.2300       9.2       188       134        60
OIR    2025250     91400   19.4800 -116.2400       9.0       189       132        60
OIR    2025250     91400   19.4800 -116.2500       8.9       189       130        60
OIR    2025250     91400   19.4800 -116.2600       8.9       189       128        60
OIR    2025250     91400   19.4800 -116.2700       8.8       189       127        60
OIR    2025250     91400   19.4800 -116.2800       8.8       189       126        60
OIR    2025250     91400   19.4800 -116.2900       8.8       189       126        60
OIR    2025250     91400   19.4800 -116.3000       8.7       189       126        60
OIR    2025250     91400   19.4800 -116.3100       8.6       189       126        60
OIR    2025250     91400   19.4800 -116.3200       8.6       190       126        60
OIR    2025250     91400   19.4800 -116.3300       8.4       190       127        60
OIR    2025250     91400   19.4800 -116.3400       8.1       192       127        60
OIR    2025250     91400   19.4800 -116.3500       7.5       195       129        60
OIR    2025250     91400   19.4800 -116.3600       6.9       198       130        60
OIR    2025250     91400   19.4800 -116.3700       6.3       202       133        60
OIR    2025250     91400   19.4800 -116.3800       5.5       211       135        60
OIR    2025250     91400   19.4800 -116.3900       5.2       218       138        60
OIR    2025250     91400   19.4800 -116.4000       5.1       225       141        60
OIR    2025250     91400   19.4800 -118.0400       6.8        68       142        60
OIR    2025250     91400   19.4800 -118.0500       7.0        69       139        60
OIR    2025250     91400   19.4800 -118.0600       7.1        69       141        60
OIR    2025250     91400   19.4700 -110.7600      10.8       132       115        60
OIR    2025250     91400   19.4700 -110.7700      10.2       131       122        60
OIR    2025250     91400   19.4700 -112.8800       7.7       173       139        60
OIR    2025250     91400   19.4700 -112.8900       7.8       173       137        60
OIR    2025250     91400   19.4700 -112.9000       7.8       173       136        60
OIR    2025250     91400   19.4700 -112.9100       7.8       173       135        60
OIR    2025250     91400   19.4700 -112.9200       7.8       173       135        60
OIR    2025250     91400   19.4700 -112.9300       7.8       173       135        60
OIR    2025250     91400   19.4700 -112.9400       7.8       173       134        60
OIR    2025250     91400   19.4700 -112.9500       7.8       173       134        60
OIR    2025250     91400   19.4700 -112.9600       7.8       173       134        60
OIR    2025250     91400   19.4700 -112.9700       7.8       173       134        60
OIR    2025250     91400   19.4700 -112.9800       7.8       173       135        60
OIR    2025250     91400   19.4700 -112.9900       7.8       173       136        60
OIR    2025250     91400   19.4700 -113.0000       7.8       173       137        60
OIR    2025250     91400   19.4700 -113.0100       7.8       173       135        60
OIR    2025250     91400   19.4700 -113.0200       7.8       173       132        60
OIR    2025250     91400   19.4700 -113.0300       7.8       174       129        60
OIR    2025250     91400   19.4700 -113.0400       7.8       174       128        60
OIR    2025250     91400   19.4700 -113.0500       7.8       174       127        60
OIR    2025250     91400   19.4700 -113.0600       7.8       174       126        60
OIR    2025250     91400   19.4700 -113.0700       7.8       174       124        60
OIR    2025250     91400   19.4700 -113.0800       7.8       174       124        60
OIR    2025250     91400   19.4700 -113.0900       7.7       174       124        60
OIR    2025250     91400   19.4700 -113.1000       7.7       174       123        60
OIR    2025250     91400   19.4700 -113.1100       7.7       174       122        60
OIR    2025250     91400   19.4700 -113.1200       7.7       174       121        60
OIR    2025250     91400   19.4700 -113.1300       7.7       174       119        60
OIR    2025250     91400   19.4700 -113.1400       7.7       174       117        60
OIR    2025250     91400   19.4700 -113.1500       7.7       174       116        60
OIR    2025250     91400   19.4700 -113.1600       7.7       174       116        60
OIR    2025250     91400   19.4700 -113.1700       7.7       174       116        60
OIR    2025250     91400   19.4700 -113.1800       7.7       174       116        60
OIR    2025250     91400   19.4700 -113.1900       7.8       174       115        60
OIR    2025250     91400   19.4700 -113.2000       7.8       174       114        60
OIR    2025250     91400   19.4700 -113.2100       7.8       174       113        60
OIR    2025250     91400   19.4700 -113.2200       7.8       174       113        60
OIR    2025250     91400   19.4700 -113.2300       7.8       174       112        60
OIR    2025250     91400   19.4700 -113.2400       7.8       174       111        60
OIR    2025250     91400   19.4700 -113.2500       7.8       174       111        60
OIR    2025250     91400   19.4700 -113.2600       7.8       174       111        60
OIR    2025250     91400   19.4700 -113.2700       7.8       174       109        60
OIR    2025250     91400   19.4700 -113.2800       7.8       174       108        60
OIR    2025250     91400   19.4700 -113.2900       7.9       174       108        60
OIR    2025250     91400   19.4700 -113.3000       7.9       174       108        60
OIR    2025250     91400   19.4700 -113.3100       7.9       174       108        60
OIR    2025250     91400   19.4700 -113.3200       7.9       174       105        60
OIR    2025250     91400   19.4700 -113.3300       7.9       174       104        60
OIR    2025250     91400   19.4700 -113.3400       8.0       174       104        60
OIR    2025250     91400   19.4700 -113.3500       8.0       174       103        60
OIR    2025250     91400   19.4700 -113.3600       8.0       174       103        60
OIR    2025250     91400   19.4700 -113.3700       8.0       174       103        60
OIR    2025250     91400   19.4700 -113.3800       8.0       174       103        60
OIR    2025250     91400   19.4700 -113.3900       8.1       174       103        60
OIR    2025250     91400   19.4700 -113.4000       8.1       174       103        60
OIR    2025250     91400   19.4700 -113.4100       8.2       175       103        60
OIR    2025250     91400   19.4700 -113.4200       8.2       175       103        60
OIR    2025250     91400   19.4700 -113.4300       8.2       175       103        60
OIR    2025250     91400   19.4700 -113.4400       8.3       175       103        60
OIR    2025250     91400   19.4700 -113.4500       8.3       175       103        60
OIR    2025250     91400   19.4700 -113.4600       8.3       175       103        60
OIR    2025250     91400   19.4700 -113.4700       8.4       175       103        60
OIR    2025250     91400   19.4700 -113.4800       8.4       175       103        60
OIR    2025250     91400   19.4700 -113.4900       8.5       175       103        60
OIR    2025250     91400   19.4700 -113.5000       8.5       176       103        60
OIR    2025250     91400   19.4700 -113.5100       8.6       176       103        60
OIR    2025250     91400   19.4700 -113.5200       8.6       176       103        60
OIR    2025250     91400   19.4700 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.4700 -113.5400       8.6       176       103        60
OIR    2025250     91400   19.4700 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.4700 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.4700 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.4700 -113.5800       8.7       176       103        60
OIR    2025250     91400   19.4700 -113.5900       8.7       176       103        60
OIR    2025250     91400   19.4700 -113.6000       8.8       177       103        60
OIR    2025250     91400   19.4700 -113.6100       8.8       177       103        60
OIR    2025250     91400   19.4700 -113.6200       8.8       177       103        60
OIR    2025250     91400   19.4700 -113.6300       8.8       177       103        60
OIR    2025250     91400   19.4700 -113.6400       8.8       177       103        60
OIR    2025250     91400   19.4700 -113.6500       8.8       177       103        60
OIR    2025250     91400   19.4700 -113.6600       8.9       177       103        60
OIR    2025250     91400   19.4700 -113.6700       8.9       177       103        60
OIR    2025250     91400   19.4700 -113.6800       8.9       177       103        60
OIR    2025250     91400   19.4700 -113.6900       8.9       177       103        60
OIR    2025250     91400   19.4700 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.4700 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.4700 -113.7200       8.9       178       103        60
OIR    2025250     91400   19.4700 -113.7300       9.0       178       103        60
OIR    2025250     91400   19.4700 -113.7400       9.0       178       103        60
OIR    2025250     91400   19.4700 -113.7500       9.0       178       103        60
OIR    2025250     91400   19.4700 -113.7600       9.0       178       104        60
OIR    2025250     91400   19.4700 -113.7700       9.0       178       104        60
OIR    2025250     91400   19.4700 -113.7800       9.0       178       104        60
OIR    2025250     91400   19.4700 -113.7900       9.0       178       104        60
OIR    2025250     91400   19.4700 -113.8000       9.1       178       104        60
OIR    2025250     91400   19.4700 -113.8100       9.1       179       105        60
OIR    2025250     91400   19.4700 -113.8200       9.1       179       105        60
OIR    2025250     91400   19.4700 -113.8300       9.1       179       105        60
OIR    2025250     91400   19.4700 -113.8400       9.1       179       107        60
OIR    2025250     91400   19.4700 -113.8500       9.1       179       107        60
OIR    2025250     91400   19.4700 -113.8600       9.1       180       108        60
OIR    2025250     91400   19.4700 -113.8700       9.2       180       108        60
OIR    2025250     91400   19.4700 -113.8800       9.2       180       108        60
OIR    2025250     91400   19.4700 -113.8900       9.2       180       108        60
OIR    2025250     91400   19.4700 -113.9000       9.2       180       107        60
OIR    2025250     91400   19.4700 -113.9100       9.2       181       107        60
OIR    2025250     91400   19.4700 -113.9200       9.3       181       105        60
OIR    2025250     91400   19.4700 -113.9300       9.3       181       105        60
OIR    2025250     91400   19.4700 -113.9400       9.3       181       107        60
OIR    2025250     91400   19.4700 -113.9500       9.3       181       108        60
OIR    2025250     91400   19.4700 -113.9600       9.3       181       108        60
OIR    2025250     91400   19.4700 -113.9700       9.3       182       108        60
OIR    2025250     91400   19.4700 -113.9800       9.4       182       108        60
OIR    2025250     91400   19.4700 -113.9900       9.4       182       108        60
OIR    2025250     91400   19.4700 -114.0000       9.4       182       108        60
OIR    2025250     91400   19.4700 -114.0100       9.4       183       108        60
OIR    2025250     91400   19.4700 -114.0200       9.4       183       109        60
OIR    2025250     91400   19.4700 -114.0300       9.4       183       108        60
OIR    2025250     91400   19.4700 -114.0400       9.4       184       108        60
OIR    2025250     91400   19.4700 -114.0500       9.4       184       107        60
OIR    2025250     91400   19.4700 -114.0600       9.4       184       107        60
OIR    2025250     91400   19.4700 -114.0700       9.4       184       107        60
OIR    2025250     91400   19.4700 -114.0800       9.4       184       108        60
OIR    2025250     91400   19.4700 -114.0900       9.4       185       108        60
OIR    2025250     91400   19.4700 -114.1000       9.4       185       107        60
OIR    2025250     91400   19.4700 -114.1100       9.3       185       107        60
OIR    2025250     91400   19.4700 -114.1200       9.3       186       107        60
OIR    2025250     91400   19.4700 -114.1300       9.3       186       108        60
OIR    2025250     91400   19.4700 -114.1400       9.3       186       108        60
OIR    2025250     91400   19.4700 -114.1500       9.3       187       107        60
OIR    2025250     91400   19.4700 -114.1600       9.3       187       108        60
OIR    2025250     91400   19.4700 -114.1700       9.3       188       108        60
OIR    2025250     91400   19.4700 -114.1800       9.3       188       109        60
OIR    2025250     91400   19.4700 -114.1900       9.3       189       109        60
OIR    2025250     91400   19.4700 -114.2000       9.2       189       109        60
OIR    2025250     91400   19.4700 -114.2100       9.2       190       110        60
OIR    2025250     91400   19.4700 -114.2200       9.2       191       111        60
OIR    2025250     91400   19.4700 -114.2300       9.1       192       111        60
OIR    2025250     91400   19.4700 -114.2400       9.1       193       111        60
OIR    2025250     91400   19.4700 -114.2500       8.9       195       111        60
OIR    2025250     91400   19.4700 -114.2600       8.8       198       111        60
OIR    2025250     91400   19.4700 -114.2700       8.6       200       111        60
OIR    2025250     91400   19.4700 -114.2800       8.5       203       112        60
OIR    2025250     91400   19.4700 -114.2900       8.4       206       112        60
OIR    2025250     91400   19.4700 -114.3000       8.3       212       112        60
OIR    2025250     91400   19.4700 -114.3100       8.3       215       112        60
OIR    2025250     91400   19.4700 -114.3200       8.3       217       113        60
OIR    2025250     91400   19.4700 -114.3300       8.3       217       115        60
OIR    2025250     91400   19.4700 -114.3400       8.3       218       115        60
OIR    2025250     91400   19.4700 -114.3500       8.3       218       115        60
OIR    2025250     91400   19.4700 -114.3600       8.3       218       116        60
OIR    2025250     91400   19.4700 -114.3700       8.3       219       119        60
OIR    2025250     91400   19.4700 -114.3800       8.3       219       122        60
OIR    2025250     91400   19.4700 -114.3900       8.3       219       123        60
OIR    2025250     91400   19.4700 -114.4000       8.3       219       125        60
OIR    2025250     91400   19.4700 -114.4100       8.3       219       127        60
OIR    2025250     91400   19.4700 -114.4200       8.3       219       129        60
OIR    2025250     91400   19.4700 -114.4300       8.3       218       130        60
OIR    2025250     91400   19.4700 -114.4400       8.2       218       128        60
OIR    2025250     91400   19.4700 -114.4500       8.2       217       125        60
OIR    2025250     91400   19.4700 -114.4600       8.1       216       128        60
OIR    2025250     91400   19.4700 -114.4700       8.0       215       130        60
OIR    2025250     91400   19.4700 -114.4800       8.0       214       129        60
OIR    2025250     91400   19.4700 -114.4900       7.8       212       127        60
OIR    2025250     91400   19.4700 -114.5000       7.7       209       126        60
OIR    2025250     91400   19.4700 -114.5100       7.6       204       127        60
OIR    2025250     91400   19.4700 -114.5200       7.5       198       129        60
OIR    2025250     91400   19.4700 -114.5300       7.4       191       127        60
OIR    2025250     91400   19.4700 -114.5400       7.3       185       126        60
OIR    2025250     91400   19.4700 -114.5500       7.1       178       128        60
OIR    2025250     91400   19.4700 -114.5600       7.0       176       131        60
OIR    2025250     91400   19.4700 -114.5700       6.9       174       133        60
OIR    2025250     91400   19.4700 -114.5800       6.8       172       133        60
OIR    2025250     91400   19.4700 -114.5900       6.8       171       131        60
OIR    2025250     91400   19.4700 -114.6000       6.7       171       126        60
OIR    2025250     91400   19.4700 -114.6100       6.7       170       125        60
OIR    2025250     91400   19.4700 -114.6200       6.7       170       131        60
OIR    2025250     91400   19.4700 -114.6300       6.7       170       138        60
OIR    2025250     91400   19.4700 -114.6400       6.7       170       139        60
OIR    2025250     91400   19.4700 -114.6500       6.7       168       139        60
OIR    2025250     91400   19.4700 -116.2000      10.0       184       142        60
OIR    2025250     91400   19.4700 -116.2100       9.9       184       140        60
OIR    2025250     91400   19.4700 -116.2200       9.8       185       137        60
OIR    2025250     91400   19.4700 -116.2300       9.3       187       135        60
OIR    2025250     91400   19.4700 -116.2400       9.1       188       133        60
OIR    2025250     91400   19.4700 -116.2500       9.0       188       130        60
OIR    2025250     91400   19.4700 -116.2600       9.0       188       129        60
OIR    2025250     91400   19.4700 -116.2700       8.9       188       129        60
OIR    2025250     91400   19.4700 -116.2800       8.9       188       128        60
OIR    2025250     91400   19.4700 -116.2900       8.8       188       127        60
OIR    2025250     91400   19.4700 -116.3000       8.8       189       127        60
OIR    2025250     91400   19.4700 -116.3100       8.7       189       127        60
OIR    2025250     91400   19.4700 -116.3200       8.6       189       127        60
OIR    2025250     91400   19.4700 -116.3300       8.5       190       128        60
OIR    2025250     91400   19.4700 -116.3400       8.1       191       129        60
OIR    2025250     91400   19.4700 -116.3500       7.4       194       131        60
OIR    2025250     91400   19.4700 -116.3600       6.5       197       133        60
OIR    2025250     91400   19.4700 -116.3700       5.4       204       135        60
OIR    2025250     91400   19.4700 -116.3800       4.8       214       137        60
OIR    2025250     91400   19.4700 -116.3900       4.6       223       140        60
OIR    2025250     91400   19.4700 -118.0500       7.0        69       140        60
OIR    2025250     91400   19.4700 -118.0600       7.1        69       142        60
OIR    2025250     91400   19.4600 -110.7700      10.8       133       134        60
OIR    2025250     91400   19.4600 -112.8900       7.8       173       137        60
OIR    2025250     91400   19.4600 -112.9000       7.8       173       137        60
OIR    2025250     91400   19.4600 -112.9100       7.8       173       138        60
OIR    2025250     91400   19.4600 -112.9200       7.8       173       138        60
OIR    2025250     91400   19.4600 -112.9300       7.8       173       138        60
OIR    2025250     91400   19.4600 -112.9400       7.8       173       137        60
OIR    2025250     91400   19.4600 -112.9500       7.8       173       136        60
OIR    2025250     91400   19.4600 -112.9600       7.8       173       134        60
OIR    2025250     91400   19.4600 -112.9700       7.8       173       133        60
OIR    2025250     91400   19.4600 -112.9800       7.8       173       132        60
OIR    2025250     91400   19.4600 -112.9900       7.8       173       135        60
OIR    2025250     91400   19.4600 -113.0000       7.8       173       138        60
OIR    2025250     91400   19.4600 -113.0100       7.8       173       136        60
OIR    2025250     91400   19.4600 -113.0200       7.8       174       133        60
OIR    2025250     91400   19.4600 -113.0300       7.8       174       129        60
OIR    2025250     91400   19.4600 -113.0400       7.8       174       128        60
OIR    2025250     91400   19.4600 -113.0500       7.8       174       127        60
OIR    2025250     91400   19.4600 -113.0600       7.8       174       125        60
OIR    2025250     91400   19.4600 -113.0700       7.8       174       123        60
OIR    2025250     91400   19.4600 -113.0800       7.8       174       122        60
OIR    2025250     91400   19.4600 -113.0900       7.8       174       122        60
OIR    2025250     91400   19.4600 -113.1000       7.7       174       122        60
OIR    2025250     91400   19.4600 -113.1100       7.7       174       121        60
OIR    2025250     91400   19.4600 -113.1200       7.7       174       120        60
OIR    2025250     91400   19.4600 -113.1300       7.7       174       117        60
OIR    2025250     91400   19.4600 -113.1400       7.7       175       116        60
OIR    2025250     91400   19.4600 -113.1500       7.7       175       115        60
OIR    2025250     91400   19.4600 -113.1600       7.7       175       116        60
OIR    2025250     91400   19.4600 -113.1700       7.7       175       116        60
OIR    2025250     91400   19.4600 -113.1800       7.7       175       116        60
OIR    2025250     91400   19.4600 -113.1900       7.8       175       115        60
OIR    2025250     91400   19.4600 -113.2000       7.8       174       114        60
OIR    2025250     91400   19.4600 -113.2100       7.8       174       113        60
OIR    2025250     91400   19.4600 -113.2200       7.8       174       112        60
OIR    2025250     91400   19.4600 -113.2300       7.8       174       112        60
OIR    2025250     91400   19.4600 -113.2400       7.8       174       112        60
OIR    2025250     91400   19.4600 -113.2500       7.8       174       111        60
OIR    2025250     91400   19.4600 -113.2600       7.8       174       111        60
OIR    2025250     91400   19.4600 -113.2700       7.8       174       110        60
OIR    2025250     91400   19.4600 -113.2800       7.8       174       109        60
OIR    2025250     91400   19.4600 -113.2900       7.9       174       108        60
OIR    2025250     91400   19.4600 -113.3000       7.9       174       108        60
OIR    2025250     91400   19.4600 -113.3100       7.9       174       108        60
OIR    2025250     91400   19.4600 -113.3200       7.9       174       105        60
OIR    2025250     91400   19.4600 -113.3300       8.0       174       104        60
OIR    2025250     91400   19.4600 -113.3400       8.0       174       104        60
OIR    2025250     91400   19.4600 -113.3500       8.0       174       104        60
OIR    2025250     91400   19.4600 -113.3600       8.0       174       104        60
OIR    2025250     91400   19.4600 -113.3700       8.0       174       104        60
OIR    2025250     91400   19.4600 -113.3800       8.1       174       103        60
OIR    2025250     91400   19.4600 -113.3900       8.1       175       103        60
OIR    2025250     91400   19.4600 -113.4000       8.1       175       103        60
OIR    2025250     91400   19.4600 -113.4100       8.2       175       103        60
OIR    2025250     91400   19.4600 -113.4200       8.2       175       103        60
OIR    2025250     91400   19.4600 -113.4300       8.2       175       103        60
OIR    2025250     91400   19.4600 -113.4400       8.3       175       103        60
OIR    2025250     91400   19.4600 -113.4500       8.3       175       103        60
OIR    2025250     91400   19.4600 -113.4600       8.3       175       103        60
OIR    2025250     91400   19.4600 -113.4700       8.4       175       103        60
OIR    2025250     91400   19.4600 -113.4800       8.4       175       103        60
OIR    2025250     91400   19.4600 -113.4900       8.5       176       103        60
OIR    2025250     91400   19.4600 -113.5000       8.6       176       103        60
OIR    2025250     91400   19.4600 -113.5100       8.6       176       103        60
OIR    2025250     91400   19.4600 -113.5200       8.6       176       103        60
OIR    2025250     91400   19.4600 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.4600 -113.5400       8.7       176       103        60
OIR    2025250     91400   19.4600 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.4600 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.4600 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.4600 -113.5800       8.7       176       103        60
OIR    2025250     91400   19.4600 -113.5900       8.7       176       103        60
OIR    2025250     91400   19.4600 -113.6000       8.8       177       103        60
OIR    2025250     91400   19.4600 -113.6100       8.8       177       103        60
OIR    2025250     91400   19.4600 -113.6200       8.8       177       103        60
OIR    2025250     91400   19.4600 -113.6300       8.8       177       103        60
OIR    2025250     91400   19.4600 -113.6400       8.8       177       103        60
OIR    2025250     91400   19.4600 -113.6500       8.8       177       103        60
OIR    2025250     91400   19.4600 -113.6600       8.9       177       103        60
OIR    2025250     91400   19.4600 -113.6700       8.9       177       103        60
OIR    2025250     91400   19.4600 -113.6800       8.9       177       103        60
OIR    2025250     91400   19.4600 -113.6900       8.9       177       103        60
OIR    2025250     91400   19.4600 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.4600 -113.7100       8.9       177       103        60
OIR    2025250     91400   19.4600 -113.7200       8.9       178       103        60
OIR    2025250     91400   19.4600 -113.7300       9.0       178       103        60
OIR    2025250     91400   19.4600 -113.7400       9.0       178       103        60
OIR    2025250     91400   19.4600 -113.7500       9.0       178       103        60
OIR    2025250     91400   19.4600 -113.7600       9.0       178       103        60
OIR    2025250     91400   19.4600 -113.7700       9.0       178       103        60
OIR    2025250     91400   19.4600 -113.7800       9.0       178       104        60
OIR    2025250     91400   19.4600 -113.7900       9.1       178       104        60
OIR    2025250     91400   19.4600 -113.8000       9.1       179       104        60
OIR    2025250     91400   19.4600 -113.8100       9.1       179       104        60
OIR    2025250     91400   19.4600 -113.8200       9.1       179       104        60
OIR    2025250     91400   19.4600 -113.8300       9.1       179       105        60
OIR    2025250     91400   19.4600 -113.8400       9.1       179       105        60
OIR    2025250     91400   19.4600 -113.8500       9.2       180       107        60
OIR    2025250     91400   19.4600 -113.8600       9.2       180       107        60
OIR    2025250     91400   19.4600 -113.8700       9.2       180       108        60
OIR    2025250     91400   19.4600 -113.8800       9.2       180       109        60
OIR    2025250     91400   19.4600 -113.8900       9.2       180       108        60
OIR    2025250     91400   19.4600 -113.9000       9.2       180       107        60
OIR    2025250     91400   19.4600 -113.9100       9.3       181       107        60
OIR    2025250     91400   19.4600 -113.9200       9.3       181       107        60
OIR    2025250     91400   19.4600 -113.9300       9.3       181       107        60
OIR    2025250     91400   19.4600 -113.9400       9.3       181       107        60
OIR    2025250     91400   19.4600 -113.9500       9.3       181       107        60
OIR    2025250     91400   19.4600 -113.9600       9.4       181       108        60
OIR    2025250     91400   19.4600 -113.9700       9.4       182       108        60
OIR    2025250     91400   19.4600 -113.9800       9.4       182       108        60
OIR    2025250     91400   19.4600 -113.9900       9.4       182       107        60
OIR    2025250     91400   19.4600 -114.0000       9.4       182       107        60
OIR    2025250     91400   19.4600 -114.0100       9.4       183       108        60
OIR    2025250     91400   19.4600 -114.0200       9.5       183       108        60
OIR    2025250     91400   19.4600 -114.0300       9.5       183       108        60
OIR    2025250     91400   19.4600 -114.0400       9.5       184       107        60
OIR    2025250     91400   19.4600 -114.0500       9.5       184       107        60
OIR    2025250     91400   19.4600 -114.0600       9.5       184       107        60
OIR    2025250     91400   19.4600 -114.0700       9.5       184       107        60
OIR    2025250     91400   19.4600 -114.0800       9.5       184       108        60
OIR    2025250     91400   19.4600 -114.0900       9.4       185       108        60
OIR    2025250     91400   19.4600 -114.1000       9.4       185       108        60
OIR    2025250     91400   19.4600 -114.1100       9.4       185       108        60
OIR    2025250     91400   19.4600 -114.1200       9.4       186       108        60
OIR    2025250     91400   19.4600 -114.1300       9.4       186       108        60
OIR    2025250     91400   19.4600 -114.1400       9.4       186       108        60
OIR    2025250     91400   19.4600 -114.1500       9.4       187       108        60
OIR    2025250     91400   19.4600 -114.1600       9.4       187       108        60
OIR    2025250     91400   19.4600 -114.1700       9.4       188       108        60
OIR    2025250     91400   19.4600 -114.1800       9.4       188       109        60
OIR    2025250     91400   19.4600 -114.1900       9.4       189       109        60
OIR    2025250     91400   19.4600 -114.2000       9.3       189       109        60
OIR    2025250     91400   19.4600 -114.2100       9.3       190       110        60
OIR    2025250     91400   19.4600 -114.2200       9.3       191       111        60
OIR    2025250     91400   19.4600 -114.2300       9.2       191       111        60
OIR    2025250     91400   19.4600 -114.2400       9.2       192       110        60
OIR    2025250     91400   19.4600 -114.2500       9.1       194       111        60
OIR    2025250     91400   19.4600 -114.2600       9.0       195       111        60
OIR    2025250     91400   19.4600 -114.2700       8.8       198       112        60
OIR    2025250     91400   19.4600 -114.2800       8.6       201       112        60
OIR    2025250     91400   19.4600 -114.2900       8.5       204       113        60
OIR    2025250     91400   19.4600 -114.3000       8.4       210       112        60
OIR    2025250     91400   19.4600 -114.3100       8.3       214       111        60
OIR    2025250     91400   19.4600 -114.3200       8.3       216       111        60
OIR    2025250     91400   19.4600 -114.3300       8.3       217       114        60
OIR    2025250     91400   19.4600 -114.3400       8.3       217       116        60
OIR    2025250     91400   19.4600 -114.3500       8.3       218       116        60
OIR    2025250     91400   19.4600 -114.3600       8.3       218       117        60
OIR    2025250     91400   19.4600 -114.3700       8.3       218       121        60
OIR    2025250     91400   19.4600 -114.3800       8.3       219       123        60
OIR    2025250     91400   19.4600 -114.3900       8.3       219       124        60
OIR    2025250     91400   19.4600 -114.4000       8.3       219       124        60
OIR    2025250     91400   19.4600 -114.4100       8.3       219       124        60
OIR    2025250     91400   19.4600 -114.4200       8.3       218       127        60
OIR    2025250     91400   19.4600 -114.4300       8.2       218       130        60
OIR    2025250     91400   19.4600 -114.4400       8.2       217       130        60
OIR    2025250     91400   19.4600 -114.4500       8.2       216       129        60
OIR    2025250     91400   19.4600 -114.4600       8.1       215       129        60
OIR    2025250     91400   19.4600 -114.4700       8.0       214       129        60
OIR    2025250     91400   19.4600 -114.4800       8.0       212       129        60
OIR    2025250     91400   19.4600 -114.4900       7.8       209       129        60
OIR    2025250     91400   19.4600 -114.5000       7.8       205       128        60
OIR    2025250     91400   19.4600 -114.5100       7.8       199       128        60
OIR    2025250     91400   19.4600 -114.5200       7.8       194       128        60
OIR    2025250     91400   19.4600 -114.5300       7.7       189       128        60
OIR    2025250     91400   19.4600 -114.5400       7.6       185       127        60
OIR    2025250     91400   19.4600 -114.5500       7.3       179       128        60
OIR    2025250     91400   19.4600 -114.5600       7.1       176       131        60
OIR    2025250     91400   19.4600 -114.5700       7.0       174       133        60
OIR    2025250     91400   19.4600 -114.5800       6.9       173       132        60
OIR    2025250     91400   19.4600 -114.5900       6.8       171       132        60
OIR    2025250     91400   19.4600 -114.6000       6.8       171       131        60
OIR    2025250     91400   19.4600 -114.6100       6.7       170       130        60
OIR    2025250     91400   19.4600 -114.6200       6.7       170       133        60
OIR    2025250     91400   19.4600 -114.6300       6.7       170       137        60
OIR    2025250     91400   19.4600 -114.6400       6.7       169       139        60
OIR    2025250     91400   19.4600 -114.6500       6.8       167       141        60
OIR    2025250     91400   19.4600 -116.2100       9.9       184       141        60
OIR    2025250     91400   19.4600 -116.2200       9.7       185       139        60
OIR    2025250     91400   19.4600 -116.2300       9.4       186       137        60
OIR    2025250     91400   19.4600 -116.2400       9.3       187       135        60
OIR    2025250     91400   19.4600 -116.2500       9.2       187       132        60
OIR    2025250     91400   19.4600 -116.2600       9.1       187       131        60
OIR    2025250     91400   19.4600 -116.2700       9.0       187       131        60
OIR    2025250     91400   19.4600 -116.2800       9.0       188       130        60
OIR    2025250     91400   19.4600 -116.2900       8.9       188       129        60
OIR    2025250     91400   19.4600 -116.3000       8.8       188       129        60
OIR    2025250     91400   19.4600 -116.3100       8.7       188       129        60
OIR    2025250     91400   19.4600 -116.3200       8.6       189       129        60
OIR    2025250     91400   19.4600 -116.3300       8.5       189       129        60
OIR    2025250     91400   19.4600 -116.3400       8.1       190       130        60
OIR    2025250     91400   19.4600 -116.3500       7.0       191       133        60
OIR    2025250     91400   19.4600 -116.3600       5.7       194       136        60
OIR    2025250     91400   19.4600 -116.3700       4.5       200       138        60
OIR    2025250     91400   19.4600 -116.3800       4.0       212       140        60
OIR    2025250     91400   19.4600 -118.0500       6.9        69       142        60
OIR    2025250     91400   19.4600 -118.0600       7.0        69       142        60
OIR    2025250     91400   19.4500 -112.8900       7.8       173       139        60
OIR    2025250     91400   19.4500 -112.9000       7.8       173       140        60
OIR    2025250     91400   19.4500 -112.9300       7.8       173       141        60
OIR    2025250     91400   19.4500 -112.9400       7.8       173       139        60
OIR    2025250     91400   19.4500 -112.9500       7.8       173       137        60
OIR    2025250     91400   19.4500 -112.9600       7.8       173       135        60
OIR    2025250     91400   19.4500 -112.9700       7.8       173       133        60
OIR    2025250     91400   19.4500 -112.9800       7.8       173       131        60
OIR    2025250     91400   19.4500 -112.9900       7.8       173       132        60
OIR    2025250     91400   19.4500 -113.0000       7.8       173       133        60
OIR    2025250     91400   19.4500 -113.0100       7.8       174       134        60
OIR    2025250     91400   19.4500 -113.0200       7.8       174       131        60
OIR    2025250     91400   19.4500 -113.0300       7.8       174       129        60
OIR    2025250     91400   19.4500 -113.0400       7.8       174       127        60
OIR    2025250     91400   19.4500 -113.0500       7.8       174       125        60
OIR    2025250     91400   19.4500 -113.0600       7.8       174       123        60
OIR    2025250     91400   19.4500 -113.0700       7.8       174       123        60
OIR    2025250     91400   19.4500 -113.0800       7.8       174       122        60
OIR    2025250     91400   19.4500 -113.0900       7.8       174       121        60
OIR    2025250     91400   19.4500 -113.1000       7.7       174       121        60
OIR    2025250     91400   19.4500 -113.1100       7.7       174       120        60
OIR    2025250     91400   19.4500 -113.1200       7.7       175       120        60
OIR    2025250     91400   19.4500 -113.1300       7.7       175       117        60
OIR    2025250     91400   19.4500 -113.1400       7.7       175       116        60
OIR    2025250     91400   19.4500 -113.1500       7.7       175       115        60
OIR    2025250     91400   19.4500 -113.1600       7.7       175       116        60
OIR    2025250     91400   19.4500 -113.1700       7.7       175       116        60
OIR    2025250     91400   19.4500 -113.1800       7.8       175       115        60
OIR    2025250     91400   19.4500 -113.1900       7.8       175       114        60
OIR    2025250     91400   19.4500 -113.2000       7.8       175       113        60
OIR    2025250     91400   19.4500 -113.2100       7.8       175       113        60
OIR    2025250     91400   19.4500 -113.2200       7.8       175       112        60
OIR    2025250     91400   19.4500 -113.2300       7.8       175       112        60
OIR    2025250     91400   19.4500 -113.2400       7.8       174       112        60
OIR    2025250     91400   19.4500 -113.2500       7.8       174       111        60
OIR    2025250     91400   19.4500 -113.2600       7.8       174       111        60
OIR    2025250     91400   19.4500 -113.2700       7.8       174       110        60
OIR    2025250     91400   19.4500 -113.2800       7.9       174       109        60
OIR    2025250     91400   19.4500 -113.2900       7.9       174       108        60
OIR    2025250     91400   19.4500 -113.3000       7.9       174       108        60
OIR    2025250     91400   19.4500 -113.3100       7.9       174       107        60
OIR    2025250     91400   19.4500 -113.3200       7.9       174       105        60
OIR    2025250     91400   19.4500 -113.3300       8.0       174       104        60
OIR    2025250     91400   19.4500 -113.3400       8.0       174       104        60
OIR    2025250     91400   19.4500 -113.3500       8.0       174       104        60
OIR    2025250     91400   19.4500 -113.3600       8.0       174       104        60
OIR    2025250     91400   19.4500 -113.3700       8.0       174       104        60
OIR    2025250     91400   19.4500 -113.3800       8.1       175       104        60
OIR    2025250     91400   19.4500 -113.3900       8.1       175       104        60
OIR    2025250     91400   19.4500 -113.4000       8.1       175       103        60
OIR    2025250     91400   19.4500 -113.4100       8.2       175       103        60
OIR    2025250     91400   19.4500 -113.4200       8.2       175       103        60
OIR    2025250     91400   19.4500 -113.4300       8.2       175       103        60
OIR    2025250     91400   19.4500 -113.4400       8.3       175       103        60
OIR    2025250     91400   19.4500 -113.4500       8.3       175       103        60
OIR    2025250     91400   19.4500 -113.4600       8.3       175       103        60
OIR    2025250     91400   19.4500 -113.4700       8.4       175       103        60
OIR    2025250     91400   19.4500 -113.4800       8.4       175       103        60
OIR    2025250     91400   19.4500 -113.4900       8.5       176       103        60
OIR    2025250     91400   19.4500 -113.5000       8.6       176       103        60
OIR    2025250     91400   19.4500 -113.5100       8.6       176       103        60
OIR    2025250     91400   19.4500 -113.5200       8.6       176       103        60
OIR    2025250     91400   19.4500 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.4500 -113.5400       8.7       176       103        60
OIR    2025250     91400   19.4500 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.4500 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.4500 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.4500 -113.5800       8.7       176       103        60
OIR    2025250     91400   19.4500 -113.5900       8.8       177       103        60
OIR    2025250     91400   19.4500 -113.6000       8.8       177       103        60
OIR    2025250     91400   19.4500 -113.6100       8.8       177       103        60
OIR    2025250     91400   19.4500 -113.6200       8.8       177       103        60
OIR    2025250     91400   19.4500 -113.6300       8.8       177       103        60
OIR    2025250     91400   19.4500 -113.6400       8.8       177       103        60
OIR    2025250     91400   19.4500 -113.6500       8.9       177       103        60
OIR    2025250     91400   19.4500 -113.6600       8.9       177       103        60
OIR    2025250     91400   19.4500 -113.6700       8.9       177       103        60
OIR    2025250     91400   19.4500 -113.6800       8.9       177       103        60
OIR    2025250     91400   19.4500 -113.6900       8.9       177       103        60
OIR    2025250     91400   19.4500 -113.7000       8.9       177       103        60
OIR    2025250     91400   19.4500 -113.7100       8.9       178       103        60
OIR    2025250     91400   19.4500 -113.7200       9.0       178       103        60
OIR    2025250     91400   19.4500 -113.7300       9.0       178       103        60
OIR    2025250     91400   19.4500 -113.7400       9.0       178       103        60
OIR    2025250     91400   19.4500 -113.7500       9.0       178       103        60
OIR    2025250     91400   19.4500 -113.7600       9.0       178       104        60
OIR    2025250     91400   19.4500 -113.7700       9.0       178       104        60
OIR    2025250     91400   19.4500 -113.7800       9.1       178       104        60
OIR    2025250     91400   19.4500 -113.7900       9.1       179       104        60
OIR    2025250     91400   19.4500 -113.8000       9.1       179       104        60
OIR    2025250     91400   19.4500 -113.8100       9.1       179       104        60
OIR    2025250     91400   19.4500 -113.8200       9.1       179       105        60
OIR    2025250     91400   19.4500 -113.8300       9.2       179       105        60
OIR    2025250     91400   19.4500 -113.8400       9.2       179       107        60
OIR    2025250     91400   19.4500 -113.8500       9.2       180       107        60
OIR    2025250     91400   19.4500 -113.8600       9.2       180       107        60
OIR    2025250     91400   19.4500 -113.8700       9.2       180       107        60
OIR    2025250     91400   19.4500 -113.8800       9.2       180       108        60
OIR    2025250     91400   19.4500 -113.8900       9.3       180       108        60
OIR    2025250     91400   19.4500 -113.9000       9.3       181       107        60
OIR    2025250     91400   19.4500 -113.9100       9.3       181       107        60
OIR    2025250     91400   19.4500 -113.9200       9.3       181       107        60
OIR    2025250     91400   19.4500 -113.9300       9.3       181       108        60
OIR    2025250     91400   19.4500 -113.9400       9.3       181       107        60
OIR    2025250     91400   19.4500 -113.9500       9.4       181       107        60
OIR    2025250     91400   19.4500 -113.9600       9.4       182       107        60
OIR    2025250     91400   19.4500 -113.9700       9.4       182       108        60
OIR    2025250     91400   19.4500 -113.9800       9.4       182       108        60
OIR    2025250     91400   19.4500 -113.9900       9.4       182       107        60
OIR    2025250     91400   19.4500 -114.0000       9.5       183       107        60
OIR    2025250     91400   19.4500 -114.0100       9.5       183       107        60
OIR    2025250     91400   19.4500 -114.0200       9.5       183       107        60
OIR    2025250     91400   19.4500 -114.0300       9.5       183       107        60
OIR    2025250     91400   19.4500 -114.0400       9.5       184       107        60
OIR    2025250     91400   19.4500 -114.0500       9.5       184       107        60
OIR    2025250     91400   19.4500 -114.0600       9.5       184       105        60
OIR    2025250     91400   19.4500 -114.0700       9.5       184       107        60
OIR    2025250     91400   19.4500 -114.0800       9.5       184       108        60
OIR    2025250     91400   19.4500 -114.0900       9.5       185       109        60
OIR    2025250     91400   19.4500 -114.1000       9.5       185       109        60
OIR    2025250     91400   19.4500 -114.1100       9.5       185       110        60
OIR    2025250     91400   19.4500 -114.1200       9.4       186       109        60
OIR    2025250     91400   19.4500 -114.1300       9.4       186       108        60
OIR    2025250     91400   19.4500 -114.1400       9.4       186       107        60
OIR    2025250     91400   19.4500 -114.1500       9.4       187       108        60
OIR    2025250     91400   19.4500 -114.1600       9.4       187       108        60
OIR    2025250     91400   19.4500 -114.1700       9.4       188       108        60
OIR    2025250     91400   19.4500 -114.1800       9.4       188       109        60
OIR    2025250     91400   19.4500 -114.1900       9.4       188       109        60
OIR    2025250     91400   19.4500 -114.2000       9.4       189       110        60
OIR    2025250     91400   19.4500 -114.2100       9.4       190       110        60
OIR    2025250     91400   19.4500 -114.2200       9.3       190       111        60
OIR    2025250     91400   19.4500 -114.2300       9.3       191       111        60
OIR    2025250     91400   19.4500 -114.2400       9.3       192       110        60
OIR    2025250     91400   19.4500 -114.2500       9.2       193       110        60
OIR    2025250     91400   19.4500 -114.2600       9.1       194       111        60
OIR    2025250     91400   19.4500 -114.2700       9.0       195       111        60
OIR    2025250     91400   19.4500 -114.2800       8.8       198       112        60
OIR    2025250     91400   19.4500 -114.2900       8.6       201       112        60
OIR    2025250     91400   19.4500 -114.3000       8.5       207       112        60
OIR    2025250     91400   19.4500 -114.3100       8.4       212       112        60
OIR    2025250     91400   19.4500 -114.3200       8.3       215       113        60
OIR    2025250     91400   19.4500 -114.3300       8.3       217       115        60
OIR    2025250     91400   19.4500 -114.3400       8.3       217       116        60
OIR    2025250     91400   19.4500 -114.3500       8.3       217       117        60
OIR    2025250     91400   19.4500 -114.3600       8.3       218       120        60
OIR    2025250     91400   19.4500 -114.3700       8.3       218       122        60
OIR    2025250     91400   19.4500 -114.3800       8.3       218       124        60
OIR    2025250     91400   19.4500 -114.3900       8.3       218       125        60
OIR    2025250     91400   19.4500 -114.4000       8.3       218       126        60
OIR    2025250     91400   19.4500 -114.4100       8.3       218       126        60
OIR    2025250     91400   19.4500 -114.4200       8.2       217       127        60
OIR    2025250     91400   19.4500 -114.4300       8.2       217       128        60
OIR    2025250     91400   19.4500 -114.4400       8.2       216       129        60
OIR    2025250     91400   19.4500 -114.4500       8.1       215       130        60
OIR    2025250     91400   19.4500 -114.4600       8.1       214       130        60
OIR    2025250     91400   19.4500 -114.4700       8.0       212       128        60
OIR    2025250     91400   19.4500 -114.4800       8.0       209       128        60
OIR    2025250     91400   19.4500 -114.4900       8.0       205       128        60
OIR    2025250     91400   19.4500 -114.5000       8.0       200       129        60
OIR    2025250     91400   19.4500 -114.5100       8.1       195       128        60
OIR    2025250     91400   19.4500 -114.5200       8.1       191       127        60
OIR    2025250     91400   19.4500 -114.5300       8.0       188       128        60
OIR    2025250     91400   19.4500 -114.5400       7.9       185       128        60
OIR    2025250     91400   19.4500 -114.5500       7.6       180       129        60
OIR    2025250     91400   19.4500 -114.5600       7.3       177       131        60
OIR    2025250     91400   19.4500 -114.5700       7.0       175       133        60
OIR    2025250     91400   19.4500 -114.5800       6.9       173       132        60
OIR    2025250     91400   19.4500 -114.5900       6.8       171       131        60
OIR    2025250     91400   19.4500 -114.6000       6.8       171       132        60
OIR    2025250     91400   19.4500 -114.6100       6.8       170       134        60
OIR    2025250     91400   19.4500 -114.6200       6.8       170       136        60
OIR    2025250     91400   19.4500 -114.6300       6.8       170       138        60
OIR    2025250     91400   19.4500 -114.6400       6.8       169       140        60
OIR    2025250     91400   19.4500 -116.0100      10.1       183       141        60
OIR    2025250     91400   19.4500 -116.2100       9.9       184       141        60
OIR    2025250     91400   19.4500 -116.2200       9.8       184       140        60
OIR    2025250     91400   19.4500 -116.2300       9.5       185       138        60
OIR    2025250     91400   19.4500 -116.2400       9.4       186       137        60
OIR    2025250     91400   19.4500 -116.2500       9.3       186       135        60
OIR    2025250     91400   19.4500 -116.2600       9.2       186       134        60
OIR    2025250     91400   19.4500 -116.2700       9.1       186       134        60
OIR    2025250     91400   19.4500 -116.2800       9.0       187       133        60
OIR    2025250     91400   19.4500 -116.2900       9.0       187       132        60
OIR    2025250     91400   19.4500 -116.3000       8.8       187       131        60
OIR    2025250     91400   19.4500 -116.3100       8.7       188       131        60
OIR    2025250     91400   19.4500 -116.3200       8.6       188       131        60
OIR    2025250     91400   19.4500 -116.3300       8.5       188       131        60
OIR    2025250     91400   19.4500 -116.3400       8.0       188       131        60
OIR    2025250     91400   19.4500 -116.3500       6.7       187       133        60
OIR    2025250     91400   19.4500 -116.3600       4.8       191       135        60
OIR    2025250     91400   19.4400 -112.9500       7.8       173       139        60
OIR    2025250     91400   19.4400 -112.9600       7.8       173       136        60
OIR    2025250     91400   19.4400 -112.9700       7.8       173       133        60
OIR    2025250     91400   19.4400 -112.9800       7.8       173       131        60
OIR    2025250     91400   19.4400 -112.9900       7.8       174       129        60
OIR    2025250     91400   19.4400 -113.0000       7.8       174       130        60
OIR    2025250     91400   19.4400 -113.0100       7.8       174       131        60
OIR    2025250     91400   19.4400 -113.0200       7.8       174       130        60
OIR    2025250     91400   19.4400 -113.0300       7.8       174       129        60
OIR    2025250     91400   19.4400 -113.0400       7.8       174       126        60
OIR    2025250     91400   19.4400 -113.0500       7.8       174       123        60
OIR    2025250     91400   19.4400 -113.0600       7.8       174       121        60
OIR    2025250     91400   19.4400 -113.0700       7.8       174       122        60
OIR    2025250     91400   19.4400 -113.0800       7.8       174       123        60
OIR    2025250     91400   19.4400 -113.0900       7.8       174       122        60
OIR    2025250     91400   19.4400 -113.1000       7.8       174       121        60
OIR    2025250     91400   19.4400 -113.1100       7.7       175       120        60
OIR    2025250     91400   19.4400 -113.1200       7.7       175       119        60
OIR    2025250     91400   19.4400 -113.1300       7.7       175       117        60
OIR    2025250     91400   19.4400 -113.1400       7.7       175       117        60
OIR    2025250     91400   19.4400 -113.1500       7.7       175       116        60
OIR    2025250     91400   19.4400 -113.1600       7.7       175       116        60
OIR    2025250     91400   19.4400 -113.1700       7.7       175       116        60
OIR    2025250     91400   19.4400 -113.1800       7.8       175       115        60
OIR    2025250     91400   19.4400 -113.1900       7.8       175       114        60
OIR    2025250     91400   19.4400 -113.2000       7.8       175       113        60
OIR    2025250     91400   19.4400 -113.2100       7.8       175       112        60
OIR    2025250     91400   19.4400 -113.2200       7.8       175       111        60
OIR    2025250     91400   19.4400 -113.2300       7.8       175       111        60
OIR    2025250     91400   19.4400 -113.2400       7.8       175       112        60
OIR    2025250     91400   19.4400 -113.2500       7.8       175       111        60
OIR    2025250     91400   19.4400 -113.2600       7.8       175       110        60
OIR    2025250     91400   19.4400 -113.2700       7.8       174       109        60
OIR    2025250     91400   19.4400 -113.2800       7.9       174       109        60
OIR    2025250     91400   19.4400 -113.2900       7.9       174       108        60
OIR    2025250     91400   19.4400 -113.3000       7.9       174       107        60
OIR    2025250     91400   19.4400 -113.3100       7.9       174       107        60
OIR    2025250     91400   19.4400 -113.3200       7.9       174       105        60
OIR    2025250     91400   19.4400 -113.3300       8.0       174       105        60
OIR    2025250     91400   19.4400 -113.3400       8.0       174       105        60
OIR    2025250     91400   19.4400 -113.3500       8.0       174       105        60
OIR    2025250     91400   19.4400 -113.3600       8.0       175       104        60
OIR    2025250     91400   19.4400 -113.3700       8.0       175       104        60
OIR    2025250     91400   19.4400 -113.3800       8.1       175       104        60
OIR    2025250     91400   19.4400 -113.3900       8.1       175       104        60
OIR    2025250     91400   19.4400 -113.4000       8.2       175       104        60
OIR    2025250     91400   19.4400 -113.4100       8.2       175       104        60
OIR    2025250     91400   19.4400 -113.4200       8.2       175       103        60
OIR    2025250     91400   19.4400 -113.4300       8.3       175       103        60
OIR    2025250     91400   19.4400 -113.4400       8.3       175       103        60
OIR    2025250     91400   19.4400 -113.4500       8.3       175       103        60
OIR    2025250     91400   19.4400 -113.4600       8.3       175       103        60
OIR    2025250     91400   19.4400 -113.4700       8.4       175       103        60
OIR    2025250     91400   19.4400 -113.4800       8.4       176       103        60
OIR    2025250     91400   19.4400 -113.4900       8.5       176       103        60
OIR    2025250     91400   19.4400 -113.5000       8.6       176       103        60
OIR    2025250     91400   19.4400 -113.5100       8.6       176       103        60
OIR    2025250     91400   19.4400 -113.5200       8.6       176       103        60
OIR    2025250     91400   19.4400 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.4400 -113.5400       8.7       176       103        60
OIR    2025250     91400   19.4400 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.4400 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.4400 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.4400 -113.5800       8.7       176       103        60
OIR    2025250     91400   19.4400 -113.5900       8.8       177       103        60
OIR    2025250     91400   19.4400 -113.6000       8.8       177       103        60
OIR    2025250     91400   19.4400 -113.6100       8.8       177       103        60
OIR    2025250     91400   19.4400 -113.6200       8.8       177       103        60
OIR    2025250     91400   19.4400 -113.6300       8.8       177       103        60
OIR    2025250     91400   19.4400 -113.6400       8.8       177       103        60
OIR    2025250     91400   19.4400 -113.6500       8.9       177       103        60
OIR    2025250     91400   19.4400 -113.6600       8.9       177       103        60
OIR    2025250     91400   19.4400 -113.6700       8.9       177       103        60
OIR    2025250     91400   19.4400 -113.6800       8.9       177       103        60
OIR    2025250     91400   19.4400 -113.6900       8.9       177       103        60
OIR    2025250     91400   19.4400 -113.7000       8.9       178       103        60
OIR    2025250     91400   19.4400 -113.7100       9.0       178       103        60
OIR    2025250     91400   19.4400 -113.7200       9.0       178       103        60
OIR    2025250     91400   19.4400 -113.7300       9.0       178       103        60
OIR    2025250     91400   19.4400 -113.7400       9.0       178       103        60
OIR    2025250     91400   19.4400 -113.7500       9.0       178       103        60
OIR    2025250     91400   19.4400 -113.7600       9.0       178       104        60
OIR    2025250     91400   19.4400 -113.7700       9.1       178       104        60
OIR    2025250     91400   19.4400 -113.7800       9.1       178       104        60
OIR    2025250     91400   19.4400 -113.7900       9.1       179       104        60
OIR    2025250     91400   19.4400 -113.8000       9.1       179       105        60
OIR    2025250     91400   19.4400 -113.8100       9.2       179       107        60
OIR    2025250     91400   19.4400 -113.8200       9.2       179       107        60
OIR    2025250     91400   19.4400 -113.8300       9.2       179       107        60
OIR    2025250     91400   19.4400 -113.8400       9.2       180       107        60
OIR    2025250     91400   19.4400 -113.8500       9.2       180       107        60
OIR    2025250     91400   19.4400 -113.8600       9.2       180       107        60
OIR    2025250     91400   19.4400 -113.8700       9.3       180       107        60
OIR    2025250     91400   19.4400 -113.8800       9.3       180       108        60
OIR    2025250     91400   19.4400 -113.8900       9.3       180       108        60
OIR    2025250     91400   19.4400 -113.9000       9.3       181       107        60
OIR    2025250     91400   19.4400 -113.9100       9.3       181       107        60
OIR    2025250     91400   19.4400 -113.9200       9.3       181       108        60
OIR    2025250     91400   19.4400 -113.9300       9.3       181       108        60
OIR    2025250     91400   19.4400 -113.9400       9.4       181       108        60
OIR    2025250     91400   19.4400 -113.9500       9.4       181       108        60
OIR    2025250     91400   19.4400 -113.9600       9.4       182       108        60
OIR    2025250     91400   19.4400 -113.9700       9.4       182       108        60
OIR    2025250     91400   19.4400 -113.9800       9.5       182       108        60
OIR    2025250     91400   19.4400 -113.9900       9.5       182       108        60
OIR    2025250     91400   19.4400 -114.0000       9.5       183       107        60
OIR    2025250     91400   19.4400 -114.0100       9.5       183       107        60
OIR    2025250     91400   19.4400 -114.0200       9.5       183       108        60
OIR    2025250     91400   19.4400 -114.0300       9.6       184       108        60
OIR    2025250     91400   19.4400 -114.0400       9.6       184       107        60
OIR    2025250     91400   19.4400 -114.0500       9.6       184       107        60
OIR    2025250     91400   19.4400 -114.0600       9.6       184       107        60
OIR    2025250     91400   19.4400 -114.0700       9.5       184       107        60
OIR    2025250     91400   19.4400 -114.0800       9.5       185       108        60
OIR    2025250     91400   19.4400 -114.0900       9.5       185       109        60
OIR    2025250     91400   19.4400 -114.1000       9.5       185       110        60
OIR    2025250     91400   19.4400 -114.1100       9.5       186       111        60
OIR    2025250     91400   19.4400 -114.1200       9.5       186       110        60
OIR    2025250     91400   19.4400 -114.1300       9.5       186       109        60
OIR    2025250     91400   19.4400 -114.1400       9.5       186       108        60
OIR    2025250     91400   19.4400 -114.1500       9.5       187       108        60
OIR    2025250     91400   19.4400 -114.1600       9.5       187       108        60
OIR    2025250     91400   19.4400 -114.1700       9.5       188       109        60
OIR    2025250     91400   19.4400 -114.1800       9.5       188       109        60
OIR    2025250     91400   19.4400 -114.1900       9.5       188       110        60
OIR    2025250     91400   19.4400 -114.2000       9.5       189       110        60
OIR    2025250     91400   19.4400 -114.2100       9.4       189       111        60
OIR    2025250     91400   19.4400 -114.2200       9.4       190       111        60
OIR    2025250     91400   19.4400 -114.2300       9.4       191       112        60
OIR    2025250     91400   19.4400 -114.2400       9.3       191       111        60
OIR    2025250     91400   19.4400 -114.2500       9.3       192       109        60
OIR    2025250     91400   19.4400 -114.2600       9.3       193       110        60
OIR    2025250     91400   19.4400 -114.2700       9.2       194       111        60
OIR    2025250     91400   19.4400 -114.2800       9.1       195       111        60
OIR    2025250     91400   19.4400 -114.2900       8.9       198       111        60
OIR    2025250     91400   19.4400 -114.3000       8.6       203       111        60
OIR    2025250     91400   19.4400 -114.3100       8.5       208       113        60
OIR    2025250     91400   19.4400 -114.3200       8.4       213       115        60
OIR    2025250     91400   19.4400 -114.3300       8.4       216       116        60
OIR    2025250     91400   19.4400 -114.3400       8.3       217       116        60
OIR    2025250     91400   19.4400 -114.3500       8.3       217       119        60
OIR    2025250     91400   19.4400 -114.3600       8.3       217       121        60
OIR    2025250     91400   19.4400 -114.3700       8.3       218       123        60
OIR    2025250     91400   19.4400 -114.3800       8.3       218       125        60
OIR    2025250     91400   19.4400 -114.3900       8.3       218       127        60
OIR    2025250     91400   19.4400 -114.4000       8.3       217       128        60
OIR    2025250     91400   19.4400 -114.4100       8.2       217       129        60
OIR    2025250     91400   19.4400 -114.4200       8.2       216       127        60
OIR    2025250     91400   19.4400 -114.4300       8.2       215       126        60
OIR    2025250     91400   19.4400 -114.4400       8.1       214       126        60
OIR    2025250     91400   19.4400 -114.4500       8.1       213       128        60
OIR    2025250     91400   19.4400 -114.4600       8.1       211       129        60
OIR    2025250     91400   19.4400 -114.4700       8.1       208       127        60
OIR    2025250     91400   19.4400 -114.4800       8.1       204       124        60
OIR    2025250     91400   19.4400 -114.4900       8.2       199       125        60
OIR    2025250     91400   19.4400 -114.5000       8.3       195       126        60
OIR    2025250     91400   19.4400 -114.5100       8.4       192       126        60
OIR    2025250     91400   19.4400 -114.5200       8.4       189       126        60
OIR    2025250     91400   19.4400 -114.5300       8.4       187       128        60
OIR    2025250     91400   19.4400 -114.5400       8.3       185       130        60
OIR    2025250     91400   19.4400 -114.5500       8.0       182       132        60
OIR    2025250     91400   19.4400 -114.5600       7.6       179       132        60
OIR    2025250     91400   19.4400 -114.5700       7.2       175       133        60
OIR    2025250     91400   19.4400 -114.5800       7.0       173       132        60
OIR    2025250     91400   19.4400 -114.5900       6.9       171       131        60
OIR    2025250     91400   19.4400 -114.6000       6.8       171       131        60
OIR    2025250     91400   19.4400 -114.6100       6.8       170       131        60
OIR    2025250     91400   19.4400 -114.6200       6.8       170       133        60
OIR    2025250     91400   19.4400 -114.6300       6.8       170       137        60
OIR    2025250     91400   19.4400 -114.6400       6.7       169       140        60
OIR    2025250     91400   19.4400 -116.2200       9.8       184       141        60
OIR    2025250     91400   19.4400 -116.2300       9.6       185       139        60
OIR    2025250     91400   19.4400 -116.2400       9.4       185       138        60
OIR    2025250     91400   19.4400 -116.2500       9.3       185       137        60
OIR    2025250     91400   19.4400 -116.2600       9.2       186       136        60
OIR    2025250     91400   19.4400 -116.2700       9.2       186       136        60
OIR    2025250     91400   19.4400 -116.2800       9.1       186       135        60
OIR    2025250     91400   19.4400 -116.2900       9.0       186       135        60
OIR    2025250     91400   19.4400 -116.3000       8.9       187       134        60
OIR    2025250     91400   19.4400 -116.3100       8.8       187       134        60
OIR    2025250     91400   19.4400 -116.3200       8.7       187       133        60
OIR    2025250     91400   19.4400 -116.3300       8.5       187       133        60
OIR    2025250     91400   19.4400 -116.3400       7.9       187       132        60
OIR    2025250     91400   19.4400 -116.3500       6.3       186       133        60
OIR    2025250     91400   19.4400 -116.3600       4.2       191       135        60
OIR    2025250     91400   19.4300 -112.9600       7.8       173       138        60
OIR    2025250     91400   19.4300 -112.9700       7.8       173       135        60
OIR    2025250     91400   19.4300 -112.9800       7.8       174       132        60
OIR    2025250     91400   19.4300 -112.9900       7.8       174       130        60
OIR    2025250     91400   19.4300 -113.0000       7.8       174       130        60
OIR    2025250     91400   19.4300 -113.0100       7.8       174       130        60
OIR    2025250     91400   19.4300 -113.0200       7.8       174       131        60
OIR    2025250     91400   19.4300 -113.0300       7.8       174       132        60
OIR    2025250     91400   19.4300 -113.0400       7.8       174       130        60
OIR    2025250     91400   19.4300 -113.0500       7.8       174       125        60
OIR    2025250     91400   19.4300 -113.0600       7.8       174       121        60
OIR    2025250     91400   19.4300 -113.0700       7.8       174       121        60
OIR    2025250     91400   19.4300 -113.0800       7.8       174       121        60
OIR    2025250     91400   19.4300 -113.0900       7.8       174       121        60
OIR    2025250     91400   19.4300 -113.1000       7.8       175       120        60
OIR    2025250     91400   19.4300 -113.1100       7.8       175       120        60
OIR    2025250     91400   19.4300 -113.1200       7.7       175       119        60
OIR    2025250     91400   19.4300 -113.1300       7.7       175       119        60
OIR    2025250     91400   19.4300 -113.1400       7.7       175       119        60
OIR    2025250     91400   19.4300 -113.1500       7.7       175       120        60
OIR    2025250     91400   19.4300 -113.1600       7.7       175       117        60
OIR    2025250     91400   19.4300 -113.1700       7.7       175       115        60
OIR    2025250     91400   19.4300 -113.1800       7.8       175       114        60
OIR    2025250     91400   19.4300 -113.1900       7.8       175       113        60
OIR    2025250     91400   19.4300 -113.2000       7.8       175       113        60
OIR    2025250     91400   19.4300 -113.2100       7.8       175       111        60
OIR    2025250     91400   19.4300 -113.2200       7.8       175       111        60
OIR    2025250     91400   19.4300 -113.2300       7.8       175       111        60
OIR    2025250     91400   19.4300 -113.2400       7.8       175       111        60
OIR    2025250     91400   19.4300 -113.2500       7.8       175       110        60
OIR    2025250     91400   19.4300 -113.2600       7.8       175       109        60
OIR    2025250     91400   19.4300 -113.2700       7.9       175       108        60
OIR    2025250     91400   19.4300 -113.2800       7.9       175       108        60
OIR    2025250     91400   19.4300 -113.2900       7.9       175       108        60
OIR    2025250     91400   19.4300 -113.3000       7.9       175       107        60
OIR    2025250     91400   19.4300 -113.3100       7.9       175       105        60
OIR    2025250     91400   19.4300 -113.3200       7.9       175       105        60
OIR    2025250     91400   19.4300 -113.3300       8.0       175       107        60
OIR    2025250     91400   19.4300 -113.3400       8.0       175       107        60
OIR    2025250     91400   19.4300 -113.3500       8.0       175       105        60
OIR    2025250     91400   19.4300 -113.3600       8.0       175       105        60
OIR    2025250     91400   19.4300 -113.3700       8.0       175       104        60
OIR    2025250     91400   19.4300 -113.3800       8.1       175       104        60
OIR    2025250     91400   19.4300 -113.3900       8.1       175       104        60
OIR    2025250     91400   19.4300 -113.4000       8.2       175       104        60
OIR    2025250     91400   19.4300 -113.4100       8.2       175       104        60
OIR    2025250     91400   19.4300 -113.4200       8.2       175       103        60
OIR    2025250     91400   19.4300 -113.4300       8.3       175       103        60
OIR    2025250     91400   19.4300 -113.4400       8.3       175       103        60
OIR    2025250     91400   19.4300 -113.4500       8.3       175       103        60
OIR    2025250     91400   19.4300 -113.4600       8.3       175       103        60
OIR    2025250     91400   19.4300 -113.4700       8.4       176       103        60
OIR    2025250     91400   19.4300 -113.4800       8.5       176       103        60
OIR    2025250     91400   19.4300 -113.4900       8.5       176       103        60
OIR    2025250     91400   19.4300 -113.5000       8.6       176       103        60
OIR    2025250     91400   19.4300 -113.5100       8.6       176       103        60
OIR    2025250     91400   19.4300 -113.5200       8.6       176       103        60
OIR    2025250     91400   19.4300 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.4300 -113.5400       8.7       176       103        60
OIR    2025250     91400   19.4300 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.4300 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.4300 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.4300 -113.5800       8.7       177       103        60
OIR    2025250     91400   19.4300 -113.5900       8.8       177       103        60
OIR    2025250     91400   19.4300 -113.6000       8.8       177       103        60
OIR    2025250     91400   19.4300 -113.6100       8.8       177       103        60
OIR    2025250     91400   19.4300 -113.6200       8.8       177       103        60
OIR    2025250     91400   19.4300 -113.6300       8.8       177       104        60
OIR    2025250     91400   19.4300 -113.6400       8.9       177       103        60
OIR    2025250     91400   19.4300 -113.6500       8.9       177       103        60
OIR    2025250     91400   19.4300 -113.6600       8.9       177       103        60
OIR    2025250     91400   19.4300 -113.6700       8.9       177       103        60
OIR    2025250     91400   19.4300 -113.6800       8.9       177       103        60
OIR    2025250     91400   19.4300 -113.6900       8.9       178       103        60
OIR    2025250     91400   19.4300 -113.7000       8.9       178       103        60
OIR    2025250     91400   19.4300 -113.7100       9.0       178       103        60
OIR    2025250     91400   19.4300 -113.7200       9.0       178       103        60
OIR    2025250     91400   19.4300 -113.7300       9.0       178       103        60
OIR    2025250     91400   19.4300 -113.7400       9.0       178       103        60
OIR    2025250     91400   19.4300 -113.7500       9.0       178       103        60
OIR    2025250     91400   19.4300 -113.7600       9.1       178       104        60
OIR    2025250     91400   19.4300 -113.7700       9.1       178       105        60
OIR    2025250     91400   19.4300 -113.7800       9.1       179       105        60
OIR    2025250     91400   19.4300 -113.7900       9.1       179       105        60
OIR    2025250     91400   19.4300 -113.8000       9.2       179       105        60
OIR    2025250     91400   19.4300 -113.8100       9.2       179       107        60
OIR    2025250     91400   19.4300 -113.8200       9.2       179       108        60
OIR    2025250     91400   19.4300 -113.8300       9.2       179       108        60
OIR    2025250     91400   19.4300 -113.8400       9.2       180       107        60
OIR    2025250     91400   19.4300 -113.8500       9.3       180       107        60
OIR    2025250     91400   19.4300 -113.8600       9.3       180       107        60
OIR    2025250     91400   19.4300 -113.8700       9.3       180       107        60
OIR    2025250     91400   19.4300 -113.8800       9.3       180       107        60
OIR    2025250     91400   19.4300 -113.8900       9.3       180       107        60
OIR    2025250     91400   19.4300 -113.9000       9.3       181       108        60
OIR    2025250     91400   19.4300 -113.9100       9.3       181       108        60
OIR    2025250     91400   19.4300 -113.9200       9.3       181       108        60
OIR    2025250     91400   19.4300 -113.9300       9.4       181       109        60
OIR    2025250     91400   19.4300 -113.9400       9.4       181       109        60
OIR    2025250     91400   19.4300 -113.9500       9.4       182       109        60
OIR    2025250     91400   19.4300 -113.9600       9.4       182       109        60
OIR    2025250     91400   19.4300 -113.9700       9.5       182       108        60
OIR    2025250     91400   19.4300 -113.9800       9.5       182       108        60
OIR    2025250     91400   19.4300 -113.9900       9.5       183       108        60
OIR    2025250     91400   19.4300 -114.0000       9.5       183       108        60
OIR    2025250     91400   19.4300 -114.0100       9.6       183       108        60
OIR    2025250     91400   19.4300 -114.0200       9.6       183       108        60
OIR    2025250     91400   19.4300 -114.0300       9.6       184       108        60
OIR    2025250     91400   19.4300 -114.0400       9.6       184       108        60
OIR    2025250     91400   19.4300 -114.0500       9.6       184       108        60
OIR    2025250     91400   19.4300 -114.0600       9.6       184       108        60
OIR    2025250     91400   19.4300 -114.0700       9.6       184       108        60
OIR    2025250     91400   19.4300 -114.0800       9.6       185       109        60
OIR    2025250     91400   19.4300 -114.0900       9.6       185       109        60
OIR    2025250     91400   19.4300 -114.1000       9.6       185       110        60
OIR    2025250     91400   19.4300 -114.1100       9.6       186       111        60
OIR    2025250     91400   19.4300 -114.1200       9.6       186       111        60
OIR    2025250     91400   19.4300 -114.1300       9.6       186       110        60
OIR    2025250     91400   19.4300 -114.1400       9.6       186       108        60
OIR    2025250     91400   19.4300 -114.1500       9.6       187       109        60
OIR    2025250     91400   19.4300 -114.1600       9.6       187       110        60
OIR    2025250     91400   19.4300 -114.1700       9.6       187       110        60
OIR    2025250     91400   19.4300 -114.1800       9.5       188       110        60
OIR    2025250     91400   19.4300 -114.1900       9.5       188       110        60
OIR    2025250     91400   19.4300 -114.2000       9.5       189       111        60
OIR    2025250     91400   19.4300 -114.2100       9.5       189       112        60
OIR    2025250     91400   19.4300 -114.2200       9.5       190       111        60
OIR    2025250     91400   19.4300 -114.2300       9.4       190       111        60
OIR    2025250     91400   19.4300 -114.2400       9.4       191       111        60
OIR    2025250     91400   19.4300 -114.2500       9.4       192       111        60
OIR    2025250     91400   19.4300 -114.2600       9.4       192       111        60
OIR    2025250     91400   19.4300 -114.2700       9.3       193       112        60
OIR    2025250     91400   19.4300 -114.2800       9.2       194       112        60
OIR    2025250     91400   19.4300 -114.2900       9.1       196       112        60
OIR    2025250     91400   19.4300 -114.3000       8.9       199       111        60
OIR    2025250     91400   19.4300 -114.3100       8.7       204       113        60
OIR    2025250     91400   19.4300 -114.3200       8.5       210       115        60
OIR    2025250     91400   19.4300 -114.3300       8.4       213       116        60
OIR    2025250     91400   19.4300 -114.3400       8.4       215       117        60
OIR    2025250     91400   19.4300 -114.3500       8.3       216       120        60
OIR    2025250     91400   19.4300 -114.3600       8.3       217       122        60
OIR    2025250     91400   19.4300 -114.3700       8.3       217       124        60
OIR    2025250     91400   19.4300 -114.3800       8.2       216       126        60
OIR    2025250     91400   19.4300 -114.3900       8.2       216       127        60
OIR    2025250     91400   19.4300 -114.4000       8.2       216       127        60
OIR    2025250     91400   19.4300 -114.4100       8.2       215       128        60
OIR    2025250     91400   19.4300 -114.4200       8.2       214       126        60
OIR    2025250     91400   19.4300 -114.4300       8.2       213       124        60
OIR    2025250     91400   19.4300 -114.4400       8.1       212       124        60
OIR    2025250     91400   19.4300 -114.4500       8.1       210       127        60
OIR    2025250     91400   19.4300 -114.4600       8.2       206       130        60
OIR    2025250     91400   19.4300 -114.4700       8.2       202       127        60
OIR    2025250     91400   19.4300 -114.4800       8.4       198       124        60
OIR    2025250     91400   19.4300 -114.4900       8.5       195       125        60
OIR    2025250     91400   19.4300 -114.5000       8.7       191       126        60
OIR    2025250     91400   19.4300 -114.5100       8.8       189       126        60
OIR    2025250     91400   19.4300 -114.5200       8.8       188       126        60
OIR    2025250     91400   19.4300 -114.5300       8.7       187       127        60
OIR    2025250     91400   19.4300 -114.5400       8.6       186       130        60
OIR    2025250     91400   19.4300 -114.5500       8.4       184       133        60
OIR    2025250     91400   19.4300 -114.5600       8.0       181       133        60
OIR    2025250     91400   19.4300 -114.5700       7.5       177       134        60
OIR    2025250     91400   19.4300 -114.5800       7.2       174       133        60
OIR    2025250     91400   19.4300 -114.5900       6.9       171       132        60
OIR    2025250     91400   19.4300 -114.6000       6.9       171       131        60
OIR    2025250     91400   19.4300 -114.6100       6.8       170       129        60
OIR    2025250     91400   19.4300 -114.6200       6.8       170       128        60
OIR    2025250     91400   19.4300 -114.6300       6.8       170       134        60
OIR    2025250     91400   19.4300 -114.6400       6.7       168       140        60
OIR    2025250     91400   19.4300 -116.2200       9.9       183       142        60
OIR    2025250     91400   19.4300 -116.2300       9.7       184       140        60
OIR    2025250     91400   19.4300 -116.2400       9.5       184       138        60
OIR    2025250     91400   19.4300 -116.2500       9.4       185       137        60
OIR    2025250     91400   19.4300 -116.2600       9.3       185       137        60
OIR    2025250     91400   19.4300 -116.2700       9.2       185       137        60
OIR    2025250     91400   19.4300 -116.2800       9.1       185       137        60
OIR    2025250     91400   19.4300 -116.2900       9.0       186       137        60
OIR    2025250     91400   19.4300 -116.3000       8.9       186       137        60
OIR    2025250     91400   19.4300 -116.3100       8.8       186       136        60
OIR    2025250     91400   19.4300 -116.3200       8.7       187       135        60
OIR    2025250     91400   19.4300 -116.3300       8.5       187       134        60
OIR    2025250     91400   19.4300 -116.3400       7.9       186       135        60
OIR    2025250     91400   19.4300 -116.3500       6.1       186       135        60
OIR    2025250     91400   19.4300 -116.3600       4.2       188       137        60
OIR    2025250     91400   19.4200 -112.9000       7.8       173       140        60
OIR    2025250     91400   19.4200 -112.9600       7.8       173       140        60
OIR    2025250     91400   19.4200 -112.9700       7.8       173       136        60
OIR    2025250     91400   19.4200 -112.9800       7.8       174       134        60
OIR    2025250     91400   19.4200 -112.9900       7.8       174       131        60
OIR    2025250     91400   19.4200 -113.0000       7.8       174       130        60
OIR    2025250     91400   19.4200 -113.0100       7.8       174       129        60
OIR    2025250     91400   19.4200 -113.0200       7.8       174       132        60
OIR    2025250     91400   19.4200 -113.0300       7.8       174       136        60
OIR    2025250     91400   19.4200 -113.0400       7.8       174       136        60
OIR    2025250     91400   19.4200 -113.0500       7.8       174       130        60
OIR    2025250     91400   19.4200 -113.0600       7.8       174       124        60
OIR    2025250     91400   19.4200 -113.0700       7.8       174       121        60
OIR    2025250     91400   19.4200 -113.0800       7.8       174       120        60
OIR    2025250     91400   19.4200 -113.0900       7.8       175       119        60
OIR    2025250     91400   19.4200 -113.1000       7.8       175       119        60
OIR    2025250     91400   19.4200 -113.1100       7.8       175       119        60
OIR    2025250     91400   19.4200 -113.1200       7.7       175       117        60
OIR    2025250     91400   19.4200 -113.1300       7.7       175       117        60
OIR    2025250     91400   19.4200 -113.1400       7.7       175       121        60
OIR    2025250     91400   19.4200 -113.1500       7.7       175       123        60
OIR    2025250     91400   19.4200 -113.1600       7.7       175       120        60
OIR    2025250     91400   19.4200 -113.1700       7.8       175       116        60
OIR    2025250     91400   19.4200 -113.1800       7.8       175       113        60
OIR    2025250     91400   19.4200 -113.1900       7.8       175       113        60
OIR    2025250     91400   19.4200 -113.2000       7.8       175       113        60
OIR    2025250     91400   19.4200 -113.2100       7.8       175       112        60
OIR    2025250     91400   19.4200 -113.2200       7.8       175       110        60
OIR    2025250     91400   19.4200 -113.2300       7.8       175       110        60
OIR    2025250     91400   19.4200 -113.2400       7.8       175       109        60
OIR    2025250     91400   19.4200 -113.2500       7.9       175       109        60
OIR    2025250     91400   19.4200 -113.2600       7.9       175       109        60
OIR    2025250     91400   19.4200 -113.2700       7.9       175       108        60
OIR    2025250     91400   19.4200 -113.2800       7.9       175       108        60
OIR    2025250     91400   19.4200 -113.2900       7.9       175       107        60
OIR    2025250     91400   19.4200 -113.3000       7.9       175       105        60
OIR    2025250     91400   19.4200 -113.3100       7.9       175       105        60
OIR    2025250     91400   19.4200 -113.3200       8.0       175       105        60
OIR    2025250     91400   19.4200 -113.3300       8.0       175       107        60
OIR    2025250     91400   19.4200 -113.3400       8.0       175       107        60
OIR    2025250     91400   19.4200 -113.3500       8.0       175       105        60
OIR    2025250     91400   19.4200 -113.3600       8.0       175       105        60
OIR    2025250     91400   19.4200 -113.3700       8.1       175       104        60
OIR    2025250     91400   19.4200 -113.3800       8.1       175       104        60
OIR    2025250     91400   19.4200 -113.3900       8.1       175       104        60
OIR    2025250     91400   19.4200 -113.4000       8.2       175       104        60
OIR    2025250     91400   19.4200 -113.4100       8.2       175       104        60
OIR    2025250     91400   19.4200 -113.4200       8.2       175       103        60
OIR    2025250     91400   19.4200 -113.4300       8.3       175       103        60
OIR    2025250     91400   19.4200 -113.4400       8.3       175       103        60
OIR    2025250     91400   19.4200 -113.4500       8.3       175       103        60
OIR    2025250     91400   19.4200 -113.4600       8.4       175       103        60
OIR    2025250     91400   19.4200 -113.4700       8.4       176       103        60
OIR    2025250     91400   19.4200 -113.4800       8.5       176       103        60
OIR    2025250     91400   19.4200 -113.4900       8.5       176       104        60
OIR    2025250     91400   19.4200 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.4200 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.4200 -113.5200       8.6       176       103        60
OIR    2025250     91400   19.4200 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.4200 -113.5400       8.7       176       103        60
OIR    2025250     91400   19.4200 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.4200 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.4200 -113.5700       8.7       176       103        60
OIR    2025250     91400   19.4200 -113.5800       8.7       177       103        60
OIR    2025250     91400   19.4200 -113.5900       8.8       177       103        60
OIR    2025250     91400   19.4200 -113.6000       8.8       177       103        60
OIR    2025250     91400   19.4200 -113.6100       8.8       177       103        60
OIR    2025250     91400   19.4200 -113.6200       8.8       177       103        60
OIR    2025250     91400   19.4200 -113.6300       8.8       177       104        60
OIR    2025250     91400   19.4200 -113.6400       8.9       177       104        60
OIR    2025250     91400   19.4200 -113.6500       8.9       177       104        60
OIR    2025250     91400   19.4200 -113.6600       8.9       177       103        60
OIR    2025250     91400   19.4200 -113.6700       8.9       177       103        60
OIR    2025250     91400   19.4200 -113.6800       8.9       178       104        60
OIR    2025250     91400   19.4200 -113.6900       8.9       178       103        60
OIR    2025250     91400   19.4200 -113.7000       9.0       178       103        60
OIR    2025250     91400   19.4200 -113.7100       9.0       178       103        60
OIR    2025250     91400   19.4200 -113.7200       9.0       178       103        60
OIR    2025250     91400   19.4200 -113.7300       9.0       178       104        60
OIR    2025250     91400   19.4200 -113.7400       9.0       178       104        60
OIR    2025250     91400   19.4200 -113.7500       9.1       178       104        60
OIR    2025250     91400   19.4200 -113.7600       9.1       178       104        60
OIR    2025250     91400   19.4200 -113.7700       9.1       178       105        60
OIR    2025250     91400   19.4200 -113.7800       9.1       179       105        60
OIR    2025250     91400   19.4200 -113.7900       9.2       179       105        60
OIR    2025250     91400   19.4200 -113.8000       9.2       179       107        60
OIR    2025250     91400   19.4200 -113.8100       9.2       179       108        60
OIR    2025250     91400   19.4200 -113.8200       9.2       179       109        60
OIR    2025250     91400   19.4200 -113.8300       9.2       180       109        60
OIR    2025250     91400   19.4200 -113.8400       9.3       180       108        60
OIR    2025250     91400   19.4200 -113.8500       9.3       180       108        60
OIR    2025250     91400   19.4200 -113.8600       9.3       180       109        60
OIR    2025250     91400   19.4200 -113.8700       9.3       180       109        60
OIR    2025250     91400   19.4200 -113.8800       9.3       180       108        60
OIR    2025250     91400   19.4200 -113.8900       9.3       180       108        60
OIR    2025250     91400   19.4200 -113.9000       9.3       181       108        60
OIR    2025250     91400   19.4200 -113.9100       9.4       181       109        60
OIR    2025250     91400   19.4200 -113.9200       9.4       181       109        60
OIR    2025250     91400   19.4200 -113.9300       9.4       181       109        60
OIR    2025250     91400   19.4200 -113.9400       9.4       181       109        60
OIR    2025250     91400   19.4200 -113.9500       9.4       182       109        60
OIR    2025250     91400   19.4200 -113.9600       9.5       182       110        60
OIR    2025250     91400   19.4200 -113.9700       9.5       182       109        60
OIR    2025250     91400   19.4200 -113.9800       9.5       183       109        60
OIR    2025250     91400   19.4200 -113.9900       9.6       183       109        60
OIR    2025250     91400   19.4200 -114.0000       9.6       183       109        60
OIR    2025250     91400   19.4200 -114.0100       9.6       183       109        60
OIR    2025250     91400   19.4200 -114.0200       9.6       184       109        60
OIR    2025250     91400   19.4200 -114.0300       9.6       184       109        60
OIR    2025250     91400   19.4200 -114.0400       9.6       184       109        60
OIR    2025250     91400   19.4200 -114.0500       9.6       184       109        60
OIR    2025250     91400   19.4200 -114.0600       9.6       184       109        60
OIR    2025250     91400   19.4200 -114.0700       9.6       184       109        60
OIR    2025250     91400   19.4200 -114.0800       9.6       185       110        60
OIR    2025250     91400   19.4200 -114.0900       9.6       185       111        60
OIR    2025250     91400   19.4200 -114.1000       9.6       185       111        60
OIR    2025250     91400   19.4200 -114.1100       9.6       186       111        60
OIR    2025250     91400   19.4200 -114.1200       9.6       186       111        60
OIR    2025250     91400   19.4200 -114.1300       9.6       186       110        60
OIR    2025250     91400   19.4200 -114.1400       9.6       187       109        60
OIR    2025250     91400   19.4200 -114.1500       9.6       187       110        60
OIR    2025250     91400   19.4200 -114.1600       9.6       187       110        60
OIR    2025250     91400   19.4200 -114.1700       9.6       187       111        60
OIR    2025250     91400   19.4200 -114.1800       9.6       188       110        60
OIR    2025250     91400   19.4200 -114.1900       9.6       188       111        60
OIR    2025250     91400   19.4200 -114.2000       9.6       189       111        60
OIR    2025250     91400   19.4200 -114.2100       9.6       189       112        60
OIR    2025250     91400   19.4200 -114.2200       9.5       190       112        60
OIR    2025250     91400   19.4200 -114.2300       9.5       190       111        60
OIR    2025250     91400   19.4200 -114.2400       9.5       191       111        60
OIR    2025250     91400   19.4200 -114.2500       9.5       191       112        60
OIR    2025250     91400   19.4200 -114.2600       9.4       192       113        60
OIR    2025250     91400   19.4200 -114.2700       9.4       192       113        60
OIR    2025250     91400   19.4200 -114.2800       9.3       193       113        60
OIR    2025250     91400   19.4200 -114.2900       9.2       195       112        60
OIR    2025250     91400   19.4200 -114.3000       9.1       197       112        60
OIR    2025250     91400   19.4200 -114.3100       8.9       200       113        60
OIR    2025250     91400   19.4200 -114.3200       8.6       205       115        60
OIR    2025250     91400   19.4200 -114.3300       8.5       209       116        60
OIR    2025250     91400   19.4200 -114.3400       8.5       212       119        60
OIR    2025250     91400   19.4200 -114.3500       8.4       214       121        60
OIR    2025250     91400   19.4200 -114.3600       8.4       214       123        60
OIR    2025250     91400   19.4200 -114.3700       8.3       215       125        60
OIR    2025250     91400   19.4200 -114.3800       8.3       215       126        60
OIR    2025250     91400   19.4200 -114.3900       8.3       215       128        60
OIR    2025250     91400   19.4200 -114.4000       8.2       214       127        60
OIR    2025250     91400   19.4200 -114.4100       8.2       213       126        60
OIR    2025250     91400   19.4200 -114.4200       8.2       211       124        60
OIR    2025250     91400   19.4200 -114.4300       8.2       210       123        60
OIR    2025250     91400   19.4200 -114.4400       8.2       207       123        60
OIR    2025250     91400   19.4200 -114.4500       8.3       205       126        60
OIR    2025250     91400   19.4200 -114.4600       8.5       201       129        60
OIR    2025250     91400   19.4200 -114.4700       8.6       197       128        60
OIR    2025250     91400   19.4200 -114.4800       8.8       193       126        60
OIR    2025250     91400   19.4200 -114.4900       9.0       191       126        60
OIR    2025250     91400   19.4200 -114.5000       9.1       189       128        60
OIR    2025250     91400   19.4200 -114.5100       9.1       188       129        60
OIR    2025250     91400   19.4200 -114.5200       9.1       187       127        60
OIR    2025250     91400   19.4200 -114.5300       9.0       187       126        60
OIR    2025250     91400   19.4200 -114.5400       8.9       186       128        60
OIR    2025250     91400   19.4200 -114.5500       8.6       184       130        60
OIR    2025250     91400   19.4200 -114.5600       8.3       182       133        60
OIR    2025250     91400   19.4200 -114.5700       7.8       178       135        60
OIR    2025250     91400   19.4200 -114.5800       7.4       175       135        60
OIR    2025250     91400   19.4200 -114.5900       7.0       172       135        60
OIR    2025250     91400   19.4200 -114.6000       6.9       171       134        60
OIR    2025250     91400   19.4200 -114.6100       6.8       171       132        60
OIR    2025250     91400   19.4200 -114.6200       6.8       170       130        60
OIR    2025250     91400   19.4200 -114.6300       6.8       170       134        60
OIR    2025250     91400   19.4200 -114.6400       6.6       168       137        60
OIR    2025250     91400   19.4200 -114.6500       6.6       163       141        60
OIR    2025250     91400   19.4200 -116.2300       9.7       183       141        60
OIR    2025250     91400   19.4200 -116.2400       9.6       184       139        60
OIR    2025250     91400   19.4200 -116.2500       9.4       184       137        60
OIR    2025250     91400   19.4200 -116.2600       9.3       184       137        60
OIR    2025250     91400   19.4200 -116.2700       9.1       184       137        60
OIR    2025250     91400   19.4200 -116.2800       9.0       185       138        60
OIR    2025250     91400   19.4200 -116.2900       8.9       185       139        60
OIR    2025250     91400   19.4200 -116.3000       8.9       185       139        60
OIR    2025250     91400   19.4200 -116.3100       8.8       185       139        60
OIR    2025250     91400   19.4200 -116.3200       8.6       186       137        60
OIR    2025250     91400   19.4200 -116.3300       8.4       186       136        60
OIR    2025250     91400   19.4200 -116.3400       7.7       185       137        60
OIR    2025250     91400   19.4200 -116.3500       6.1       186       137        60
OIR    2025250     91400   19.4200 -116.3600       4.6       188       139        60
OIR    2025250     91400   19.4100 -112.9500       7.8       173       141        60
OIR    2025250     91400   19.4100 -112.9600       7.8       173       138        60
OIR    2025250     91400   19.4100 -112.9700       7.8       174       135        60
OIR    2025250     91400   19.4100 -112.9800       7.8       174       133        60
OIR    2025250     91400   19.4100 -112.9900       7.8       174       131        60
OIR    2025250     91400   19.4100 -113.0000       7.8       174       131        60
OIR    2025250     91400   19.4100 -113.0100       7.8       174       133        60
OIR    2025250     91400   19.4100 -113.0200       7.8       174       134        60
OIR    2025250     91400   19.4100 -113.0300       7.8       174       133        60
OIR    2025250     91400   19.4100 -113.0400       7.8       174       133        60
OIR    2025250     91400   19.4100 -113.0500       7.8       174       129        60
OIR    2025250     91400   19.4100 -113.0600       7.8       174       124        60
OIR    2025250     91400   19.4100 -113.0700       7.8       174       122        60
OIR    2025250     91400   19.4100 -113.0800       7.8       175       120        60
OIR    2025250     91400   19.4100 -113.0900       7.8       175       117        60
OIR    2025250     91400   19.4100 -113.1000       7.8       175       117        60
OIR    2025250     91400   19.4100 -113.1100       7.8       175       116        60
OIR    2025250     91400   19.4100 -113.1200       7.8       175       116        60
OIR    2025250     91400   19.4100 -113.1300       7.8       175       116        60
OIR    2025250     91400   19.4100 -113.1400       7.8       175       119        60
OIR    2025250     91400   19.4100 -113.1500       7.8       175       123        60
OIR    2025250     91400   19.4100 -113.1600       7.8       175       120        60
OIR    2025250     91400   19.4100 -113.1700       7.8       175       116        60
OIR    2025250     91400   19.4100 -113.1800       7.8       175       112        60
OIR    2025250     91400   19.4100 -113.1900       7.8       175       112        60
OIR    2025250     91400   19.4100 -113.2000       7.8       175       112        60
OIR    2025250     91400   19.4100 -113.2100       7.8       175       111        60
OIR    2025250     91400   19.4100 -113.2200       7.8       175       110        60
OIR    2025250     91400   19.4100 -113.2300       7.8       175       109        60
OIR    2025250     91400   19.4100 -113.2400       7.9       175       108        60
OIR    2025250     91400   19.4100 -113.2500       7.9       175       108        60
OIR    2025250     91400   19.4100 -113.2600       7.9       175       108        60
OIR    2025250     91400   19.4100 -113.2700       7.9       175       108        60
OIR    2025250     91400   19.4100 -113.2800       7.9       175       107        60
OIR    2025250     91400   19.4100 -113.2900       7.9       175       105        60
OIR    2025250     91400   19.4100 -113.3000       7.9       175       105        60
OIR    2025250     91400   19.4100 -113.3100       7.9       175       104        60
OIR    2025250     91400   19.4100 -113.3200       8.0       175       105        60
OIR    2025250     91400   19.4100 -113.3300       8.0       175       107        60
OIR    2025250     91400   19.4100 -113.3400       8.0       175       108        60
OIR    2025250     91400   19.4100 -113.3500       8.0       175       107        60
OIR    2025250     91400   19.4100 -113.3600       8.0       175       105        60
OIR    2025250     91400   19.4100 -113.3700       8.1       175       104        60
OIR    2025250     91400   19.4100 -113.3800       8.1       175       104        60
OIR    2025250     91400   19.4100 -113.3900       8.1       175       104        60
OIR    2025250     91400   19.4100 -113.4000       8.2       175       104        60
OIR    2025250     91400   19.4100 -113.4100       8.2       175       104        60
OIR    2025250     91400   19.4100 -113.4200       8.2       175       103        60
OIR    2025250     91400   19.4100 -113.4300       8.3       175       103        60
OIR    2025250     91400   19.4100 -113.4400       8.3       175       103        60
OIR    2025250     91400   19.4100 -113.4500       8.3       175       103        60
OIR    2025250     91400   19.4100 -113.4600       8.4       176       104        60
OIR    2025250     91400   19.4100 -113.4700       8.4       176       103        60
OIR    2025250     91400   19.4100 -113.4800       8.5       176       103        60
OIR    2025250     91400   19.4100 -113.4900       8.5       176       104        60
OIR    2025250     91400   19.4100 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.4100 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.4100 -113.5200       8.6       176       103        60
OIR    2025250     91400   19.4100 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.4100 -113.5400       8.6       176       103        60
OIR    2025250     91400   19.4100 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.4100 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.4100 -113.5700       8.7       177       103        60
OIR    2025250     91400   19.4100 -113.5800       8.8       177       103        60
OIR    2025250     91400   19.4100 -113.5900       8.8       177       103        60
OIR    2025250     91400   19.4100 -113.6000       8.8       177       103        60
OIR    2025250     91400   19.4100 -113.6100       8.8       177       103        60
OIR    2025250     91400   19.4100 -113.6200       8.8       177       103        60
OIR    2025250     91400   19.4100 -113.6300       8.9       177       103        60
OIR    2025250     91400   19.4100 -113.6400       8.9       177       104        60
OIR    2025250     91400   19.4100 -113.6500       8.9       177       103        60
OIR    2025250     91400   19.4100 -113.6600       8.9       177       103        60
OIR    2025250     91400   19.4100 -113.6700       8.9       178       103        60
OIR    2025250     91400   19.4100 -113.6800       8.9       178       103        60
OIR    2025250     91400   19.4100 -113.6900       8.9       178       103        60
OIR    2025250     91400   19.4100 -113.7000       9.0       178       103        60
OIR    2025250     91400   19.4100 -113.7100       9.0       178       103        60
OIR    2025250     91400   19.4100 -113.7200       9.0       178       103        60
OIR    2025250     91400   19.4100 -113.7300       9.0       178       103        60
OIR    2025250     91400   19.4100 -113.7400       9.0       178       104        60
OIR    2025250     91400   19.4100 -113.7500       9.1       178       104        60
OIR    2025250     91400   19.4100 -113.7600       9.1       178       104        60
OIR    2025250     91400   19.4100 -113.7700       9.1       179       105        60
OIR    2025250     91400   19.4100 -113.7800       9.2       179       107        60
OIR    2025250     91400   19.4100 -113.7900       9.2       179       107        60
OIR    2025250     91400   19.4100 -113.8000       9.2       179       107        60
OIR    2025250     91400   19.4100 -113.8100       9.2       179       108        60
OIR    2025250     91400   19.4100 -113.8200       9.2       179       109        60
OIR    2025250     91400   19.4100 -113.8300       9.3       180       109        60
OIR    2025250     91400   19.4100 -113.8400       9.3       180       109        60
OIR    2025250     91400   19.4100 -113.8500       9.3       180       109        60
OIR    2025250     91400   19.4100 -113.8600       9.3       180       109        60
OIR    2025250     91400   19.4100 -113.8700       9.3       180       110        60
OIR    2025250     91400   19.4100 -113.8800       9.3       180       109        60
OIR    2025250     91400   19.4100 -113.8900       9.3       181       108        60
OIR    2025250     91400   19.4100 -113.9000       9.4       181       109        60
OIR    2025250     91400   19.4100 -113.9100       9.4       181       110        60
OIR    2025250     91400   19.4100 -113.9200       9.4       181       111        60
OIR    2025250     91400   19.4100 -113.9300       9.4       181       110        60
OIR    2025250     91400   19.4100 -113.9400       9.4       181       109        60
OIR    2025250     91400   19.4100 -113.9500       9.4       182       110        60
OIR    2025250     91400   19.4100 -113.9600       9.5       182       110        60
OIR    2025250     91400   19.4100 -113.9700       9.5       182       110        60
OIR    2025250     91400   19.4100 -113.9800       9.6       183       109        60
OIR    2025250     91400   19.4100 -113.9900       9.6       183       110        60
OIR    2025250     91400   19.4100 -114.0000       9.6       183       110        60
OIR    2025250     91400   19.4100 -114.0100       9.6       184       110        60
OIR    2025250     91400   19.4100 -114.0200       9.7       184       110        60
OIR    2025250     91400   19.4100 -114.0300       9.7       184       110        60
OIR    2025250     91400   19.4100 -114.0400       9.7       184       110        60
OIR    2025250     91400   19.4100 -114.0500       9.7       184       110        60
OIR    2025250     91400   19.4100 -114.0600       9.7       184       110        60
OIR    2025250     91400   19.4100 -114.0700       9.7       185       111        60
OIR    2025250     91400   19.4100 -114.0800       9.7       185       111        60
OIR    2025250     91400   19.4100 -114.0900       9.7       185       112        60
OIR    2025250     91400   19.4100 -114.1000       9.7       185       112        60
OIR    2025250     91400   19.4100 -114.1100       9.7       186       111        60
OIR    2025250     91400   19.4100 -114.1200       9.7       186       110        60
OIR    2025250     91400   19.4100 -114.1300       9.7       186       110        60
OIR    2025250     91400   19.4100 -114.1400       9.7       187       110        60
OIR    2025250     91400   19.4100 -114.1500       9.7       187       110        60
OIR    2025250     91400   19.4100 -114.1600       9.7       187       111        60
OIR    2025250     91400   19.4100 -114.1700       9.7       187       111        60
OIR    2025250     91400   19.4100 -114.1800       9.7       188       111        60
OIR    2025250     91400   19.4100 -114.1900       9.7       188       111        60
OIR    2025250     91400   19.4100 -114.2000       9.6       189       112        60
OIR    2025250     91400   19.4100 -114.2100       9.6       189       113        60
OIR    2025250     91400   19.4100 -114.2200       9.6       189       113        60
OIR    2025250     91400   19.4100 -114.2300       9.6       190       113        60
OIR    2025250     91400   19.4100 -114.2400       9.5       191       113        60
OIR    2025250     91400   19.4100 -114.2500       9.5       191       113        60
OIR    2025250     91400   19.4100 -114.2600       9.5       192       113        60
OIR    2025250     91400   19.4100 -114.2700       9.4       192       113        60
OIR    2025250     91400   19.4100 -114.2800       9.4       193       113        60
OIR    2025250     91400   19.4100 -114.2900       9.3       194       113        60
OIR    2025250     91400   19.4100 -114.3000       9.2       195       113        60
OIR    2025250     91400   19.4100 -114.3100       9.1       197       114        60
OIR    2025250     91400   19.4100 -114.3200       8.8       200       116        60
OIR    2025250     91400   19.4100 -114.3300       8.7       204       117        60
OIR    2025250     91400   19.4100 -114.3400       8.6       208       120        60
OIR    2025250     91400   19.4100 -114.3500       8.6       209       122        60
OIR    2025250     91400   19.4100 -114.3600       8.5       210       123        60
OIR    2025250     91400   19.4100 -114.3700       8.4       211       124        60
OIR    2025250     91400   19.4100 -114.3800       8.4       212       126        60
OIR    2025250     91400   19.4100 -114.3900       8.4       212       128        60
OIR    2025250     91400   19.4100 -114.4000       8.3       211       128        60
OIR    2025250     91400   19.4100 -114.4100       8.3       209       126        60
OIR    2025250     91400   19.4100 -114.4200       8.4       207       125        60
OIR    2025250     91400   19.4100 -114.4300       8.4       204       123        60
OIR    2025250     91400   19.4100 -114.4400       8.5       201       122        60
OIR    2025250     91400   19.4100 -114.4500       8.7       198       125        60
OIR    2025250     91400   19.4100 -114.4600       9.0       194       127        60
OIR    2025250     91400   19.4100 -114.4700       9.2       192       127        60
OIR    2025250     91400   19.4100 -114.4800       9.3       190       126        60
OIR    2025250     91400   19.4100 -114.4900       9.3       188       126        60
OIR    2025250     91400   19.4100 -114.5000       9.3       188       129        60
OIR    2025250     91400   19.4100 -114.5100       9.3       187       132        60
OIR    2025250     91400   19.4100 -114.5200       9.2       187       129        60
OIR    2025250     91400   19.4100 -114.5300       9.2       187       127        60
OIR    2025250     91400   19.4100 -114.5400       9.1       186       128        60
OIR    2025250     91400   19.4100 -114.5500       8.9       185       129        60
OIR    2025250     91400   19.4100 -114.5600       8.6       183       132        60
OIR    2025250     91400   19.4100 -114.5700       8.1       179       135        60
OIR    2025250     91400   19.4100 -114.5800       7.6       176       137        60
OIR    2025250     91400   19.4100 -114.5900       7.1       172       137        60
OIR    2025250     91400   19.4100 -114.6000       6.9       171       137        60
OIR    2025250     91400   19.4100 -114.6100       6.8       171       135        60
OIR    2025250     91400   19.4100 -114.6200       6.8       170       134        60
OIR    2025250     91400   19.4100 -114.6300       6.7       170       134        60
OIR    2025250     91400   19.4100 -114.6400       6.5       167       136        60
OIR    2025250     91400   19.4100 -114.6500       6.4       162       138        60
OIR    2025250     91400   19.4100 -116.2300       9.7       183       142        60
OIR    2025250     91400   19.4100 -116.2400       9.6       183       140        60
OIR    2025250     91400   19.4100 -116.2500       9.4       183       138        60
OIR    2025250     91400   19.4100 -116.2600       9.3       183       136        60
OIR    2025250     91400   19.4100 -116.2700       9.2       184       138        60
OIR    2025250     91400   19.4100 -116.2800       9.0       184       139        60
OIR    2025250     91400   19.4100 -116.2900       8.9       184       140        60
OIR    2025250     91400   19.4100 -116.3000       8.9       184       140        60
OIR    2025250     91400   19.4100 -116.3100       8.8       185       140        60
OIR    2025250     91400   19.4100 -116.3200       8.6       185       138        60
OIR    2025250     91400   19.4100 -116.3300       8.3       185       137        60
OIR    2025250     91400   19.4100 -116.3400       7.6       185       138        60
OIR    2025250     91400   19.4100 -116.3500       6.3       186       139        60
OIR    2025250     91400   19.4100 -116.3600       5.0       189       141        60
OIR    2025250     91400   19.4000 -112.9200       7.8       173       140        60
OIR    2025250     91400   19.4000 -112.9300       7.8       173       138        60
OIR    2025250     91400   19.4000 -112.9400       7.8       173       138        60
OIR    2025250     91400   19.4000 -112.9500       7.8       173       138        60
OIR    2025250     91400   19.4000 -112.9600       7.8       173       136        60
OIR    2025250     91400   19.4000 -112.9700       7.8       174       133        60
OIR    2025250     91400   19.4000 -112.9800       7.8       174       132        60
OIR    2025250     91400   19.4000 -112.9900       7.8       174       130        60
OIR    2025250     91400   19.4000 -113.0000       7.8       174       130        60
OIR    2025250     91400   19.4000 -113.0100       7.8       174       135        60
OIR    2025250     91400   19.4000 -113.0200       7.8       174       140        60
OIR    2025250     91400   19.4000 -113.0300       7.8       174       133        60
OIR    2025250     91400   19.4000 -113.0400       7.8       174       128        60
OIR    2025250     91400   19.4000 -113.0500       7.8       174       126        60
OIR    2025250     91400   19.4000 -113.0600       7.8       174       124        60
OIR    2025250     91400   19.4000 -113.0700       7.8       174       122        60
OIR    2025250     91400   19.4000 -113.0800       7.8       175       119        60
OIR    2025250     91400   19.4000 -113.0900       7.8       175       116        60
OIR    2025250     91400   19.4000 -113.1000       7.8       175       116        60
OIR    2025250     91400   19.4000 -113.1100       7.8       175       115        60
OIR    2025250     91400   19.4000 -113.1200       7.8       175       115        60
OIR    2025250     91400   19.4000 -113.1300       7.8       175       116        60
OIR    2025250     91400   19.4000 -113.1400       7.8       175       116        60
OIR    2025250     91400   19.4000 -113.1500       7.8       175       116        60
OIR    2025250     91400   19.4000 -113.1600       7.8       175       116        60
OIR    2025250     91400   19.4000 -113.1700       7.8       175       114        60
OIR    2025250     91400   19.4000 -113.1800       7.8       175       112        60
OIR    2025250     91400   19.4000 -113.1900       7.8       175       111        60
OIR    2025250     91400   19.4000 -113.2000       7.8       175       110        60
OIR    2025250     91400   19.4000 -113.2100       7.8       175       110        60
OIR    2025250     91400   19.4000 -113.2200       7.8       175       109        60
OIR    2025250     91400   19.4000 -113.2300       7.9       175       109        60
OIR    2025250     91400   19.4000 -113.2400       7.9       175       108        60
OIR    2025250     91400   19.4000 -113.2500       7.9       175       108        60
OIR    2025250     91400   19.4000 -113.2600       7.9       175       108        60
OIR    2025250     91400   19.4000 -113.2700       7.9       175       107        60
OIR    2025250     91400   19.4000 -113.2800       7.9       175       107        60
OIR    2025250     91400   19.4000 -113.2900       7.9       175       105        60
OIR    2025250     91400   19.4000 -113.3000       7.9       175       105        60
OIR    2025250     91400   19.4000 -113.3100       8.0       175       105        60
OIR    2025250     91400   19.4000 -113.3200       8.0       175       105        60
OIR    2025250     91400   19.4000 -113.3300       8.0       175       107        60
OIR    2025250     91400   19.4000 -113.3400       8.0       175       108        60
OIR    2025250     91400   19.4000 -113.3500       8.0       175       107        60
OIR    2025250     91400   19.4000 -113.3600       8.0       175       104        60
OIR    2025250     91400   19.4000 -113.3700       8.1       175       104        60
OIR    2025250     91400   19.4000 -113.3800       8.1       175       104        60
OIR    2025250     91400   19.4000 -113.3900       8.1       175       104        60
OIR    2025250     91400   19.4000 -113.4000       8.2       175       104        60
OIR    2025250     91400   19.4000 -113.4100       8.2       175       104        60
OIR    2025250     91400   19.4000 -113.4200       8.2       175       104        60
OIR    2025250     91400   19.4000 -113.4300       8.3       175       103        60
OIR    2025250     91400   19.4000 -113.4400       8.3       175       103        60
OIR    2025250     91400   19.4000 -113.4500       8.3       176       104        60
OIR    2025250     91400   19.4000 -113.4600       8.4       176       104        60
OIR    2025250     91400   19.4000 -113.4700       8.4       176       104        60
OIR    2025250     91400   19.4000 -113.4800       8.5       176       104        60
OIR    2025250     91400   19.4000 -113.4900       8.5       176       104        60
OIR    2025250     91400   19.4000 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.4000 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.4000 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.4000 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.4000 -113.5400       8.6       176       103        60
OIR    2025250     91400   19.4000 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.4000 -113.5600       8.7       176       103        60
OIR    2025250     91400   19.4000 -113.5700       8.7       177       103        60
OIR    2025250     91400   19.4000 -113.5800       8.8       177       103        60
OIR    2025250     91400   19.4000 -113.5900       8.8       177       103        60
OIR    2025250     91400   19.4000 -113.6000       8.8       177       103        60
OIR    2025250     91400   19.4000 -113.6100       8.8       177       103        60
OIR    2025250     91400   19.4000 -113.6200       8.8       177       103        60
OIR    2025250     91400   19.4000 -113.6300       8.9       177       103        60
OIR    2025250     91400   19.4000 -113.6400       8.9       177       103        60
OIR    2025250     91400   19.4000 -113.6500       8.9       177       103        60
OIR    2025250     91400   19.4000 -113.6600       8.9       178       103        60
OIR    2025250     91400   19.4000 -113.6700       8.9       178       103        60
OIR    2025250     91400   19.4000 -113.6800       8.9       178       103        60
OIR    2025250     91400   19.4000 -113.6900       8.9       178       103        60
OIR    2025250     91400   19.4000 -113.7000       9.0       178       103        60
OIR    2025250     91400   19.4000 -113.7100       9.0       178       103        60
OIR    2025250     91400   19.4000 -113.7200       9.0       178       103        60
OIR    2025250     91400   19.4000 -113.7300       9.0       178       103        60
OIR    2025250     91400   19.4000 -113.7400       9.1       178       104        60
OIR    2025250     91400   19.4000 -113.7500       9.1       178       104        60
OIR    2025250     91400   19.4000 -113.7600       9.1       178       105        60
OIR    2025250     91400   19.4000 -113.7700       9.2       179       107        60
OIR    2025250     91400   19.4000 -113.7800       9.2       179       108        60
OIR    2025250     91400   19.4000 -113.7900       9.2       179       108        60
OIR    2025250     91400   19.4000 -113.8000       9.2       179       107        60
OIR    2025250     91400   19.4000 -113.8100       9.2       179       108        60
OIR    2025250     91400   19.4000 -113.8200       9.3       180       109        60
OIR    2025250     91400   19.4000 -113.8300       9.3       180       109        60
OIR    2025250     91400   19.4000 -113.8400       9.3       180       109        60
OIR    2025250     91400   19.4000 -113.8500       9.3       180       109        60
OIR    2025250     91400   19.4000 -113.8600       9.3       180       109        60
OIR    2025250     91400   19.4000 -113.8700       9.3       180       109        60
OIR    2025250     91400   19.4000 -113.8800       9.3       180       109        60
OIR    2025250     91400   19.4000 -113.8900       9.4       181       108        60
OIR    2025250     91400   19.4000 -113.9000       9.4       181       109        60
OIR    2025250     91400   19.4000 -113.9100       9.4       181       109        60
OIR    2025250     91400   19.4000 -113.9200       9.4       181       110        60
OIR    2025250     91400   19.4000 -113.9300       9.4       181       109        60
OIR    2025250     91400   19.4000 -113.9400       9.4       182       109        60
OIR    2025250     91400   19.4000 -113.9500       9.5       182       109        60
OIR    2025250     91400   19.4000 -113.9600       9.5       182       109        60
OIR    2025250     91400   19.4000 -113.9700       9.5       183       110        60
OIR    2025250     91400   19.4000 -113.9800       9.6       183       110        60
OIR    2025250     91400   19.4000 -113.9900       9.6       183       110        60
OIR    2025250     91400   19.4000 -114.0000       9.7       183       111        60
OIR    2025250     91400   19.4000 -114.0100       9.7       184       111        60
OIR    2025250     91400   19.4000 -114.0200       9.7       184       110        60
OIR    2025250     91400   19.4000 -114.0300       9.7       184       110        60
OIR    2025250     91400   19.4000 -114.0400       9.7       184       110        60
OIR    2025250     91400   19.4000 -114.0500       9.7       184       109        60
OIR    2025250     91400   19.4000 -114.0600       9.7       184       110        60
OIR    2025250     91400   19.4000 -114.0700       9.7       185       112        60
OIR    2025250     91400   19.4000 -114.0800       9.7       185       112        60
OIR    2025250     91400   19.4000 -114.0900       9.7       185       113        60
OIR    2025250     91400   19.4000 -114.1000       9.7       186       112        60
OIR    2025250     91400   19.4000 -114.1100       9.7       186       112        60
OIR    2025250     91400   19.4000 -114.1200       9.7       186       111        60
OIR    2025250     91400   19.4000 -114.1300       9.7       186       110        60
OIR    2025250     91400   19.4000 -114.1400       9.7       187       110        60
OIR    2025250     91400   19.4000 -114.1500       9.7       187       111        60
OIR    2025250     91400   19.4000 -114.1600       9.7       187       111        60
OIR    2025250     91400   19.4000 -114.1700       9.7       187       111        60
OIR    2025250     91400   19.4000 -114.1800       9.7       188       111        60
OIR    2025250     91400   19.4000 -114.1900       9.7       188       110        60
OIR    2025250     91400   19.4000 -114.2000       9.7       188       112        60
OIR    2025250     91400   19.4000 -114.2100       9.7       189       113        60
OIR    2025250     91400   19.4000 -114.2200       9.7       189       114        60
OIR    2025250     91400   19.4000 -114.2300       9.6       190       114        60
OIR    2025250     91400   19.4000 -114.2400       9.6       190       114        60
OIR    2025250     91400   19.4000 -114.2500       9.5       191       114        60
OIR    2025250     91400   19.4000 -114.2600       9.5       191       114        60
OIR    2025250     91400   19.4000 -114.2700       9.5       192       114        60
OIR    2025250     91400   19.4000 -114.2800       9.4       193       114        60
OIR    2025250     91400   19.4000 -114.2900       9.4       193       114        60
OIR    2025250     91400   19.4000 -114.3000       9.3       194       114        60
OIR    2025250     91400   19.4000 -114.3100       9.2       195       115        60
OIR    2025250     91400   19.4000 -114.3200       9.0       197       117        60
OIR    2025250     91400   19.4000 -114.3300       8.9       199       120        60
OIR    2025250     91400   19.4000 -114.3400       8.9       202       122        60
OIR    2025250     91400   19.4000 -114.3500       8.8       204       123        60
OIR    2025250     91400   19.4000 -114.3600       8.8       205       123        60
OIR    2025250     91400   19.4000 -114.3700       8.6       207       123        60
OIR    2025250     91400   19.4000 -114.3800       8.6       208       124        60
OIR    2025250     91400   19.4000 -114.3900       8.6       208       127        60
OIR    2025250     91400   19.4000 -114.4000       8.6       206       129        60
OIR    2025250     91400   19.4000 -114.4100       8.7       203       128        60
OIR    2025250     91400   19.4000 -114.4200       8.7       201       127        60
OIR    2025250     91400   19.4000 -114.4300       8.8       199       125        60
OIR    2025250     91400   19.4000 -114.4400       8.9       196       123        60
OIR    2025250     91400   19.4000 -114.4500       9.1       193       123        60
OIR    2025250     91400   19.4000 -114.4600       9.3       191       124        60
OIR    2025250     91400   19.4000 -114.4700       9.4       189       124        60
OIR    2025250     91400   19.4000 -114.4800       9.4       188       125        60
OIR    2025250     91400   19.4000 -114.4900       9.4       188       126        60
OIR    2025250     91400   19.4000 -114.5000       9.4       188       129        60
OIR    2025250     91400   19.4000 -114.5100       9.4       187       132        60
OIR    2025250     91400   19.4000 -114.5200       9.3       187       132        60
OIR    2025250     91400   19.4000 -114.5300       9.3       187       131        60
OIR    2025250     91400   19.4000 -114.5400       9.2       186       131        60
OIR    2025250     91400   19.4000 -114.5500       9.1       186       133        60
OIR    2025250     91400   19.4000 -114.5600       8.9       184       134        60
OIR    2025250     91400   19.4000 -114.5700       8.4       181       134        60
OIR    2025250     91400   19.4000 -114.5800       7.9       178       134        60
OIR    2025250     91400   19.4000 -114.5900       7.2       173       135        60
OIR    2025250     91400   19.4000 -114.6000       6.9       171       135        60
OIR    2025250     91400   19.4000 -114.6100       6.8       171       135        60
OIR    2025250     91400   19.4000 -114.6200       6.8       170       135        60
OIR    2025250     91400   19.4000 -114.6300       6.7       169       136        60
OIR    2025250     91400   19.4000 -114.6400       6.5       166       138        60
OIR    2025250     91400   19.4000 -114.6500       6.3       162       140        60
OIR    2025250     91400   19.4000 -116.2400       9.6       182       141        60
OIR    2025250     91400   19.4000 -116.2500       9.5       182       139        60
OIR    2025250     91400   19.4000 -116.2600       9.3       183       137        60
OIR    2025250     91400   19.4000 -116.2700       9.2       183       138        60
OIR    2025250     91400   19.4000 -116.2800       9.0       183       139        60
OIR    2025250     91400   19.4000 -116.2900       8.9       183       140        60
OIR    2025250     91400   19.4000 -116.3000       8.8       183       141        60
OIR    2025250     91400   19.4000 -116.3100       8.7       184       141        60
OIR    2025250     91400   19.4000 -116.3200       8.4       184       139        60
OIR    2025250     91400   19.4000 -116.3300       8.1       184       138        60
OIR    2025250     91400   19.4000 -116.3400       7.6       185       139        60
OIR    2025250     91400   19.4000 -116.3500       6.6       187       140        60
OIR    2025250     91400   19.3900 -112.9200       7.8       173       139        60
OIR    2025250     91400   19.3900 -112.9300       7.8       173       134        60
OIR    2025250     91400   19.3900 -112.9400       7.8       173       136        60
OIR    2025250     91400   19.3900 -112.9500       7.8       173       137        60
OIR    2025250     91400   19.3900 -112.9600       7.8       173       136        60
OIR    2025250     91400   19.3900 -112.9700       7.8       174       135        60
OIR    2025250     91400   19.3900 -112.9800       7.8       174       133        60
OIR    2025250     91400   19.3900 -112.9900       7.8       174       131        60
OIR    2025250     91400   19.3900 -113.0000       7.8       174       129        60
OIR    2025250     91400   19.3900 -113.0100       7.8       174       131        60
OIR    2025250     91400   19.3900 -113.0200       7.8       174       132        60
OIR    2025250     91400   19.3900 -113.0300       7.8       174       129        60
OIR    2025250     91400   19.3900 -113.0400       7.8       174       125        60
OIR    2025250     91400   19.3900 -113.0500       7.8       174       123        60
OIR    2025250     91400   19.3900 -113.0600       7.8       174       122        60
OIR    2025250     91400   19.3900 -113.0700       7.8       175       121        60
OIR    2025250     91400   19.3900 -113.0800       7.8       175       120        60
OIR    2025250     91400   19.3900 -113.0900       7.8       175       117        60
OIR    2025250     91400   19.3900 -113.1000       7.8       175       116        60
OIR    2025250     91400   19.3900 -113.1100       7.8       175       115        60
OIR    2025250     91400   19.3900 -113.1200       7.8       175       114        60
OIR    2025250     91400   19.3900 -113.1300       7.8       175       115        60
OIR    2025250     91400   19.3900 -113.1400       7.8       175       115        60
OIR    2025250     91400   19.3900 -113.1500       7.8       175       114        60
OIR    2025250     91400   19.3900 -113.1600       7.8       175       113        60
OIR    2025250     91400   19.3900 -113.1700       7.8       175       113        60
OIR    2025250     91400   19.3900 -113.1800       7.8       175       112        60
OIR    2025250     91400   19.3900 -113.1900       7.8       175       111        60
OIR    2025250     91400   19.3900 -113.2000       7.9       175       109        60
OIR    2025250     91400   19.3900 -113.2100       7.9       175       108        60
OIR    2025250     91400   19.3900 -113.2200       7.9       175       108        60
OIR    2025250     91400   19.3900 -113.2300       7.9       175       109        60
OIR    2025250     91400   19.3900 -113.2400       7.9       175       108        60
OIR    2025250     91400   19.3900 -113.2500       7.9       175       108        60
OIR    2025250     91400   19.3900 -113.2600       7.9       175       108        60
OIR    2025250     91400   19.3900 -113.2700       7.9       175       107        60
OIR    2025250     91400   19.3900 -113.2800       7.9       175       107        60
OIR    2025250     91400   19.3900 -113.2900       7.9       175       105        60
OIR    2025250     91400   19.3900 -113.3000       8.0       175       105        60
OIR    2025250     91400   19.3900 -113.3100       8.0       175       105        60
OIR    2025250     91400   19.3900 -113.3200       8.0       175       105        60
OIR    2025250     91400   19.3900 -113.3300       8.0       175       105        60
OIR    2025250     91400   19.3900 -113.3400       8.0       175       107        60
OIR    2025250     91400   19.3900 -113.3500       8.0       175       107        60
OIR    2025250     91400   19.3900 -113.3600       8.0       175       104        60
OIR    2025250     91400   19.3900 -113.3700       8.1       175       104        60
OIR    2025250     91400   19.3900 -113.3800       8.1       175       104        60
OIR    2025250     91400   19.3900 -113.3900       8.1       175       105        60
OIR    2025250     91400   19.3900 -113.4000       8.2       175       104        60
OIR    2025250     91400   19.3900 -113.4100       8.2       175       104        60
OIR    2025250     91400   19.3900 -113.4200       8.2       175       104        60
OIR    2025250     91400   19.3900 -113.4300       8.3       175       104        60
OIR    2025250     91400   19.3900 -113.4400       8.3       175       104        60
OIR    2025250     91400   19.3900 -113.4500       8.4       176       104        60
OIR    2025250     91400   19.3900 -113.4600       8.4       176       104        60
OIR    2025250     91400   19.3900 -113.4700       8.4       176       104        60
OIR    2025250     91400   19.3900 -113.4800       8.5       176       104        60
OIR    2025250     91400   19.3900 -113.4900       8.5       176       104        60
OIR    2025250     91400   19.3900 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.3900 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.3900 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.3900 -113.5300       8.6       176       103        60
OIR    2025250     91400   19.3900 -113.5400       8.6       176       103        60
OIR    2025250     91400   19.3900 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.3900 -113.5600       8.7       177       103        60
OIR    2025250     91400   19.3900 -113.5700       8.7       177       103        60
OIR    2025250     91400   19.3900 -113.5800       8.8       177       103        60
OIR    2025250     91400   19.3900 -113.5900       8.8       177       104        60
OIR    2025250     91400   19.3900 -113.6000       8.8       177       104        60
OIR    2025250     91400   19.3900 -113.6100       8.8       177       103        60
OIR    2025250     91400   19.3900 -113.6200       8.8       177       103        60
OIR    2025250     91400   19.3900 -113.6300       8.9       177       103        60
OIR    2025250     91400   19.3900 -113.6400       8.9       177       103        60
OIR    2025250     91400   19.3900 -113.6500       8.9       177       103        60
OIR    2025250     91400   19.3900 -113.6600       8.9       178       103        60
OIR    2025250     91400   19.3900 -113.6700       8.9       178       103        60
OIR    2025250     91400   19.3900 -113.6800       8.9       178       103        60
OIR    2025250     91400   19.3900 -113.6900       9.0       178       103        60
OIR    2025250     91400   19.3900 -113.7000       9.0       178       103        60
OIR    2025250     91400   19.3900 -113.7100       9.0       178       103        60
OIR    2025250     91400   19.3900 -113.7200       9.0       178       104        60
OIR    2025250     91400   19.3900 -113.7300       9.0       178       104        60
OIR    2025250     91400   19.3900 -113.7400       9.1       178       104        60
OIR    2025250     91400   19.3900 -113.7500       9.1       178       104        60
OIR    2025250     91400   19.3900 -113.7600       9.1       179       105        60
OIR    2025250     91400   19.3900 -113.7700       9.2       179       107        60
OIR    2025250     91400   19.3900 -113.7800       9.2       179       108        60
OIR    2025250     91400   19.3900 -113.7900       9.2       179       108        60
OIR    2025250     91400   19.3900 -113.8000       9.2       179       108        60
OIR    2025250     91400   19.3900 -113.8100       9.3       179       108        60
OIR    2025250     91400   19.3900 -113.8200       9.3       180       108        60
OIR    2025250     91400   19.3900 -113.8300       9.3       180       109        60
OIR    2025250     91400   19.3900 -113.8400       9.3       180       109        60
OIR    2025250     91400   19.3900 -113.8500       9.3       180       110        60
OIR    2025250     91400   19.3900 -113.8600       9.3       180       110        60
OIR    2025250     91400   19.3900 -113.8700       9.3       180       110        60
OIR    2025250     91400   19.3900 -113.8800       9.4       180       109        60
OIR    2025250     91400   19.3900 -113.8900       9.4       181       109        60
OIR    2025250     91400   19.3900 -113.9000       9.4       181       108        60
OIR    2025250     91400   19.3900 -113.9100       9.4       181       109        60
OIR    2025250     91400   19.3900 -113.9200       9.4       181       109        60
OIR    2025250     91400   19.3900 -113.9300       9.4       181       109        60
OIR    2025250     91400   19.3900 -113.9400       9.5       182       109        60
OIR    2025250     91400   19.3900 -113.9500       9.5       182       108        60
OIR    2025250     91400   19.3900 -113.9600       9.5       182       108        60
OIR    2025250     91400   19.3900 -113.9700       9.6       183       109        60
OIR    2025250     91400   19.3900 -113.9800       9.6       183       110        60
OIR    2025250     91400   19.3900 -113.9900       9.7       183       111        60
OIR    2025250     91400   19.3900 -114.0000       9.7       184       111        60
OIR    2025250     91400   19.3900 -114.0100       9.7       184       111        60
OIR    2025250     91400   19.3900 -114.0200       9.7       184       111        60
OIR    2025250     91400   19.3900 -114.0300       9.7       184       110        60
OIR    2025250     91400   19.3900 -114.0400       9.7       184       109        60
OIR    2025250     91400   19.3900 -114.0500       9.7       184       109        60
OIR    2025250     91400   19.3900 -114.0600       9.8       184       109        60
OIR    2025250     91400   19.3900 -114.0700       9.8       185       111        60
OIR    2025250     91400   19.3900 -114.0800       9.8       185       113        60
OIR    2025250     91400   19.3900 -114.0900       9.8       185       113        60
OIR    2025250     91400   19.3900 -114.1000       9.8       186       112        60
OIR    2025250     91400   19.3900 -114.1100       9.8       186       112        60
OIR    2025250     91400   19.3900 -114.1200       9.8       186       111        60
OIR    2025250     91400   19.3900 -114.1300       9.8       186       111        60
OIR    2025250     91400   19.3900 -114.1400       9.8       187       111        60
OIR    2025250     91400   19.3900 -114.1500       9.8       187       111        60
OIR    2025250     91400   19.3900 -114.1600       9.8       187       111        60
OIR    2025250     91400   19.3900 -114.1700       9.8       187       110        60
OIR    2025250     91400   19.3900 -114.1800       9.8       188       110        60
OIR    2025250     91400   19.3900 -114.1900       9.8       188       110        60
OIR    2025250     91400   19.3900 -114.2000       9.8       188       111        60
OIR    2025250     91400   19.3900 -114.2100       9.8       189       113        60
OIR    2025250     91400   19.3900 -114.2200       9.7       189       113        60
OIR    2025250     91400   19.3900 -114.2300       9.7       190       113        60
OIR    2025250     91400   19.3900 -114.2400       9.6       190       113        60
OIR    2025250     91400   19.3900 -114.2500       9.6       191       113        60
OIR    2025250     91400   19.3900 -114.2600       9.6       191       112        60
OIR    2025250     91400   19.3900 -114.2700       9.5       192       113        60
OIR    2025250     91400   19.3900 -114.2800       9.5       192       113        60
OIR    2025250     91400   19.3900 -114.2900       9.4       193       114        60
OIR    2025250     91400   19.3900 -114.3000       9.3       194       115        60
OIR    2025250     91400   19.3900 -114.3100       9.3       195       116        60
OIR    2025250     91400   19.3900 -114.3200       9.2       196       120        60
OIR    2025250     91400   19.3900 -114.3300       9.1       197       122        60
OIR    2025250     91400   19.3900 -114.3400       9.1       199       124        60
OIR    2025250     91400   19.3900 -114.3500       9.0       200       125        60
OIR    2025250     91400   19.3900 -114.3600       9.0       201       125        60
OIR    2025250     91400   19.3900 -114.3700       8.9       202       125        60
OIR    2025250     91400   19.3900 -114.3800       8.9       202       125        60
OIR    2025250     91400   19.3900 -114.3900       8.9       201       126        60
OIR    2025250     91400   19.3900 -114.4000       9.0       199       127        60
OIR    2025250     91400   19.3900 -114.4100       9.1       198       128        60
OIR    2025250     91400   19.3900 -114.4200       9.1       197       128        60
OIR    2025250     91400   19.3900 -114.4300       9.1       195       127        60
OIR    2025250     91400   19.3900 -114.4400       9.3       193       126        60
OIR    2025250     91400   19.3900 -114.4500       9.4       190       125        60
OIR    2025250     91400   19.3900 -114.4600       9.5       189       125        60
OIR    2025250     91400   19.3900 -114.4700       9.5       189       125        60
OIR    2025250     91400   19.3900 -114.4800       9.5       188       126        60
OIR    2025250     91400   19.3900 -114.4900       9.5       188       127        60
OIR    2025250     91400   19.3900 -114.5000       9.5       187       129        60
OIR    2025250     91400   19.3900 -114.5100       9.5       187       132        60
OIR    2025250     91400   19.3900 -114.5200       9.4       187       133        60
OIR    2025250     91400   19.3900 -114.5300       9.4       186       133        60
OIR    2025250     91400   19.3900 -114.5400       9.3       186       134        60
OIR    2025250     91400   19.3900 -114.5500       9.3       186       135        60
OIR    2025250     91400   19.3900 -114.5600       9.1       185       136        60
OIR    2025250     91400   19.3900 -114.5700       8.7       182       134        60
OIR    2025250     91400   19.3900 -114.5800       8.2       180       132        60
OIR    2025250     91400   19.3900 -114.5900       7.4       174       132        60
OIR    2025250     91400   19.3900 -114.6000       6.9       171       133        60
OIR    2025250     91400   19.3900 -114.6100       6.8       170       134        60
OIR    2025250     91400   19.3900 -114.6200       6.8       170       136        60
OIR    2025250     91400   19.3900 -114.6300       6.7       169       138        60
OIR    2025250     91400   19.3900 -114.6400       6.5       166       140        60
OIR    2025250     91400   19.3900 -116.2400       9.7       182       141        60
OIR    2025250     91400   19.3900 -116.2500       9.5       182       140        60
OIR    2025250     91400   19.3900 -116.2600       9.3       182       139        60
OIR    2025250     91400   19.3900 -116.2700       9.2       182       139        60
OIR    2025250     91400   19.3900 -116.2800       9.0       182       140        60
OIR    2025250     91400   19.3900 -116.2900       8.9       182       141        60
OIR    2025250     91400   19.3900 -116.3000       8.8       183       141        60
OIR    2025250     91400   19.3900 -116.3100       8.7       183       141        60
OIR    2025250     91400   19.3900 -116.3200       8.4       183       141        60
OIR    2025250     91400   19.3900 -116.3300       8.1       184       140        60
OIR    2025250     91400   19.3900 -116.3400       7.5       185       141        60
OIR    2025250     91400   19.3900 -116.3500       6.8       187       141        60
OIR    2025250     91400   19.3800 -112.9200       7.8       173       139        60
OIR    2025250     91400   19.3800 -112.9300       7.8       173       132        60
OIR    2025250     91400   19.3800 -112.9400       7.8       173       133        60
OIR    2025250     91400   19.3800 -112.9500       7.8       173       136        60
OIR    2025250     91400   19.3800 -112.9600       7.8       173       136        60
OIR    2025250     91400   19.3800 -112.9700       7.8       174       135        60
OIR    2025250     91400   19.3800 -112.9800       7.8       174       134        60
OIR    2025250     91400   19.3800 -112.9900       7.8       174       131        60
OIR    2025250     91400   19.3800 -113.0000       7.8       174       129        60
OIR    2025250     91400   19.3800 -113.0100       7.8       174       127        60
OIR    2025250     91400   19.3800 -113.0200       7.7       174       125        60
OIR    2025250     91400   19.3800 -113.0300       7.8       174       124        60
OIR    2025250     91400   19.3800 -113.0400       7.8       174       122        60
OIR    2025250     91400   19.3800 -113.0500       7.8       174       120        60
OIR    2025250     91400   19.3800 -113.0600       7.8       174       121        60
OIR    2025250     91400   19.3800 -113.0700       7.8       175       121        60
OIR    2025250     91400   19.3800 -113.0800       7.8       175       120        60
OIR    2025250     91400   19.3800 -113.0900       7.8       175       117        60
OIR    2025250     91400   19.3800 -113.1000       7.8       175       116        60
OIR    2025250     91400   19.3800 -113.1100       7.8       175       116        60
OIR    2025250     91400   19.3800 -113.1200       7.8       175       115        60
OIR    2025250     91400   19.3800 -113.1300       7.8       175       115        60
OIR    2025250     91400   19.3800 -113.1400       7.8       175       114        60
OIR    2025250     91400   19.3800 -113.1500       7.8       175       114        60
OIR    2025250     91400   19.3800 -113.1600       7.8       175       114        60
OIR    2025250     91400   19.3800 -113.1700       7.8       175       113        60
OIR    2025250     91400   19.3800 -113.1800       7.8       175       112        60
OIR    2025250     91400   19.3800 -113.1900       7.9       175       111        60
OIR    2025250     91400   19.3800 -113.2000       7.9       175       110        60
OIR    2025250     91400   19.3800 -113.2100       7.9       175       108        60
OIR    2025250     91400   19.3800 -113.2200       7.9       175       108        60
OIR    2025250     91400   19.3800 -113.2300       7.9       175       108        60
OIR    2025250     91400   19.3800 -113.2400       7.9       175       108        60
OIR    2025250     91400   19.3800 -113.2500       7.9       175       108        60
OIR    2025250     91400   19.3800 -113.2600       7.9       175       108        60
OIR    2025250     91400   19.3800 -113.2700       7.9       175       107        60
OIR    2025250     91400   19.3800 -113.2800       7.9       175       107        60
OIR    2025250     91400   19.3800 -113.2900       7.9       175       107        60
OIR    2025250     91400   19.3800 -113.3000       8.0       175       105        60
OIR    2025250     91400   19.3800 -113.3100       8.0       175       105        60
OIR    2025250     91400   19.3800 -113.3200       8.0       175       104        60
OIR    2025250     91400   19.3800 -113.3300       8.0       175       104        60
OIR    2025250     91400   19.3800 -113.3400       8.0       175       105        60
OIR    2025250     91400   19.3800 -113.3500       8.0       175       105        60
OIR    2025250     91400   19.3800 -113.3600       8.1       175       104        60
OIR    2025250     91400   19.3800 -113.3700       8.1       175       104        60
OIR    2025250     91400   19.3800 -113.3800       8.1       175       104        60
OIR    2025250     91400   19.3800 -113.3900       8.1       175       105        60
OIR    2025250     91400   19.3800 -113.4000       8.2       175       105        60
OIR    2025250     91400   19.3800 -113.4100       8.2       175       104        60
OIR    2025250     91400   19.3800 -113.4200       8.3       175       104        60
OIR    2025250     91400   19.3800 -113.4300       8.3       175       104        60
OIR    2025250     91400   19.3800 -113.4400       8.3       176       104        60
OIR    2025250     91400   19.3800 -113.4500       8.4       176       104        60
OIR    2025250     91400   19.3800 -113.4600       8.4       176       104        60
OIR    2025250     91400   19.3800 -113.4700       8.4       176       104        60
OIR    2025250     91400   19.3800 -113.4800       8.5       176       104        60
OIR    2025250     91400   19.3800 -113.4900       8.5       176       104        60
OIR    2025250     91400   19.3800 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.3800 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.3800 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.3800 -113.5300       8.6       176       104        60
OIR    2025250     91400   19.3800 -113.5400       8.6       176       103        60
OIR    2025250     91400   19.3800 -113.5500       8.7       176       103        60
OIR    2025250     91400   19.3800 -113.5600       8.7       177       103        60
OIR    2025250     91400   19.3800 -113.5700       8.7       177       104        60
OIR    2025250     91400   19.3800 -113.5800       8.8       177       104        60
OIR    2025250     91400   19.3800 -113.5900       8.8       177       104        60
OIR    2025250     91400   19.3800 -113.6000       8.8       177       104        60
OIR    2025250     91400   19.3800 -113.6100       8.8       177       104        60
OIR    2025250     91400   19.3800 -113.6200       8.9       177       103        60
OIR    2025250     91400   19.3800 -113.6300       8.9       177       103        60
OIR    2025250     91400   19.3800 -113.6400       8.9       177       103        60
OIR    2025250     91400   19.3800 -113.6500       8.9       177       103        60
OIR    2025250     91400   19.3800 -113.6600       8.9       178       103        60
OIR    2025250     91400   19.3800 -113.6700       8.9       178       103        60
OIR    2025250     91400   19.3800 -113.6800       9.0       178       103        60
OIR    2025250     91400   19.3800 -113.6900       9.0       178       103        60
OIR    2025250     91400   19.3800 -113.7000       9.0       178       103        60
OIR    2025250     91400   19.3800 -113.7100       9.0       178       103        60
OIR    2025250     91400   19.3800 -113.7200       9.0       178       104        60
OIR    2025250     91400   19.3800 -113.7300       9.1       178       104        60
OIR    2025250     91400   19.3800 -113.7400       9.1       178       104        60
OIR    2025250     91400   19.3800 -113.7500       9.1       178       104        60
OIR    2025250     91400   19.3800 -113.7600       9.2       179       105        60
OIR    2025250     91400   19.3800 -113.7700       9.2       179       107        60
OIR    2025250     91400   19.3800 -113.7800       9.2       179       108        60
OIR    2025250     91400   19.3800 -113.7900       9.2       179       108        60
OIR    2025250     91400   19.3800 -113.8000       9.3       179       108        60
OIR    2025250     91400   19.3800 -113.8100       9.3       180       108        60
OIR    2025250     91400   19.3800 -113.8200       9.3       180       108        60
OIR    2025250     91400   19.3800 -113.8300       9.3       180       109        60
OIR    2025250     91400   19.3800 -113.8400       9.3       180       109        60
OIR    2025250     91400   19.3800 -113.8500       9.3       180       109        60
OIR    2025250     91400   19.3800 -113.8600       9.3       180       110        60
OIR    2025250     91400   19.3800 -113.8700       9.4       180       110        60
OIR    2025250     91400   19.3800 -113.8800       9.4       180       110        60
OIR    2025250     91400   19.3800 -113.8900       9.4       181       110        60
OIR    2025250     91400   19.3800 -113.9000       9.4       181       110        60
OIR    2025250     91400   19.3800 -113.9100       9.4       181       109        60
OIR    2025250     91400   19.3800 -113.9200       9.4       181       109        60
OIR    2025250     91400   19.3800 -113.9300       9.4       181       109        60
OIR    2025250     91400   19.3800 -113.9400       9.5       182       109        60
OIR    2025250     91400   19.3800 -113.9500       9.5       182       109        60
OIR    2025250     91400   19.3800 -113.9600       9.6       183       109        60
OIR    2025250     91400   19.3800 -113.9700       9.6       183       109        60
OIR    2025250     91400   19.3800 -113.9800       9.7       183       110        60
OIR    2025250     91400   19.3800 -113.9900       9.7       184       110        60
OIR    2025250     91400   19.3800 -114.0000       9.7       184       111        60
OIR    2025250     91400   19.3800 -114.0100       9.7       184       112        60
OIR    2025250     91400   19.3800 -114.0200       9.8       184       111        60
OIR    2025250     91400   19.3800 -114.0300       9.8       184       111        60
OIR    2025250     91400   19.3800 -114.0400       9.8       184       110        60
OIR    2025250     91400   19.3800 -114.0500       9.8       184       110        60
OIR    2025250     91400   19.3800 -114.0600       9.8       185       109        60
OIR    2025250     91400   19.3800 -114.0700       9.8       185       111        60
OIR    2025250     91400   19.3800 -114.0800       9.8       185       113        60
OIR    2025250     91400   19.3800 -114.0900       9.8       185       113        60
OIR    2025250     91400   19.3800 -114.1000       9.8       186       113        60
OIR    2025250     91400   19.3800 -114.1100       9.8       186       112        60
OIR    2025250     91400   19.3800 -114.1200       9.9       186       112        60
OIR    2025250     91400   19.3800 -114.1300       9.9       186       112        60
OIR    2025250     91400   19.3800 -114.1400       9.9       187       112        60
OIR    2025250     91400   19.3800 -114.1500       9.9       187       111        60
OIR    2025250     91400   19.3800 -114.1600       9.9       187       111        60
OIR    2025250     91400   19.3800 -114.1700       9.9       187       110        60
OIR    2025250     91400   19.3800 -114.1800       9.9       188       110        60
OIR    2025250     91400   19.3800 -114.1900       9.9       188       110        60
OIR    2025250     91400   19.3800 -114.2000       9.9       188       111        60
OIR    2025250     91400   19.3800 -114.2100       9.8       188       112        60
OIR    2025250     91400   19.3800 -114.2200       9.8       189       114        60
OIR    2025250     91400   19.3800 -114.2300       9.8       189       113        60
OIR    2025250     91400   19.3800 -114.2400       9.7       190       112        60
OIR    2025250     91400   19.3800 -114.2500       9.6       191       111        60
OIR    2025250     91400   19.3800 -114.2600       9.6       191       111        60
OIR    2025250     91400   19.3800 -114.2700       9.6       192       112        60
OIR    2025250     91400   19.3800 -114.2800       9.5       192       112        60
OIR    2025250     91400   19.3800 -114.2900       9.5       193       113        60
OIR    2025250     91400   19.3800 -114.3000       9.4       193       116        60
OIR    2025250     91400   19.3800 -114.3100       9.3       194       120        60
OIR    2025250     91400   19.3800 -114.3200       9.3       195       122        60
OIR    2025250     91400   19.3800 -114.3300       9.2       196       124        60
OIR    2025250     91400   19.3800 -114.3400       9.2       197       125        60
OIR    2025250     91400   19.3800 -114.3500       9.2       198       126        60
OIR    2025250     91400   19.3800 -114.3600       9.2       198       127        60
OIR    2025250     91400   19.3800 -114.3700       9.2       198       128        60
OIR    2025250     91400   19.3800 -114.3800       9.2       198       127        60
OIR    2025250     91400   19.3800 -114.3900       9.3       196       125        60
OIR    2025250     91400   19.3800 -114.4000       9.3       195       124        60
OIR    2025250     91400   19.3800 -114.4100       9.4       195       126        60
OIR    2025250     91400   19.3800 -114.4200       9.4       194       127        60
OIR    2025250     91400   19.3800 -114.4300       9.4       192       128        60
OIR    2025250     91400   19.3800 -114.4400       9.5       190       128        60
OIR    2025250     91400   19.3800 -114.4500       9.6       189       128        60
OIR    2025250     91400   19.3800 -114.4600       9.6       189       129        60
OIR    2025250     91400   19.3800 -114.4700       9.6       188       130        60
OIR    2025250     91400   19.3800 -114.4800       9.6       188       131        60
OIR    2025250     91400   19.3800 -114.4900       9.6       188       131        60
OIR    2025250     91400   19.3800 -114.5000       9.6       187       131        60
OIR    2025250     91400   19.3800 -114.5100       9.5       187       132        60
OIR    2025250     91400   19.3800 -114.5200       9.5       187       133        60
OIR    2025250     91400   19.3800 -114.5300       9.4       186       136        60
OIR    2025250     91400   19.3800 -114.5400       9.4       186       137        60
OIR    2025250     91400   19.3800 -114.5500       9.3       186       137        60
OIR    2025250     91400   19.3800 -114.5600       9.2       185       136        60
OIR    2025250     91400   19.3800 -114.5700       8.9       183       135        60
OIR    2025250     91400   19.3800 -114.5800       8.5       181       133        60
OIR    2025250     91400   19.3800 -114.5900       7.7       176       134        60
OIR    2025250     91400   19.3800 -114.6000       7.0       171       135        60
OIR    2025250     91400   19.3800 -114.6100       6.8       170       136        60
OIR    2025250     91400   19.3800 -114.6200       6.8       170       138        60
OIR    2025250     91400   19.3800 -114.6300       6.7       169       140        60
OIR    2025250     91400   19.3800 -114.6400       6.6       167       141        60
OIR    2025250     91400   19.3800 -116.2400       9.7       181       142        60
OIR    2025250     91400   19.3800 -116.2500       9.5       181       140        60
OIR    2025250     91400   19.3800 -116.2600       9.3       181       140        60
OIR    2025250     91400   19.3800 -116.2700       9.1       181       140        60
OIR    2025250     91400   19.3800 -116.2800       9.0       181       141        60
OIR    2025250     91400   19.3800 -116.2900       8.9       182       141        60
OIR    2025250     91400   19.3800 -116.3000       8.8       182       141        60
OIR    2025250     91400   19.3800 -116.3100       8.6       182       142        60
OIR    2025250     91400   19.3800 -116.3200       8.4       182       142        60
OIR    2025250     91400   19.3800 -116.3300       8.0       183       142        60
OIR    2025250     91400   19.3700 -109.5000       8.3        31       139        60
OIR    2025250     91400   19.3700 -112.9200       7.8       173       140        60
OIR    2025250     91400   19.3700 -112.9300       7.8       173       133        60
OIR    2025250     91400   19.3700 -112.9400       7.8       173       132        60
OIR    2025250     91400   19.3700 -112.9500       7.8       173       133        60
OIR    2025250     91400   19.3700 -112.9600       7.8       173       133        60
OIR    2025250     91400   19.3700 -112.9700       7.8       174       133        60
OIR    2025250     91400   19.3700 -112.9800       7.8       174       133        60
OIR    2025250     91400   19.3700 -112.9900       7.8       174       133        60
OIR    2025250     91400   19.3700 -113.0000       7.8       174       133        60
OIR    2025250     91400   19.3700 -113.0100       7.8       174       129        60
OIR    2025250     91400   19.3700 -113.0200       7.8       174       125        60
OIR    2025250     91400   19.3700 -113.0300       7.8       174       122        60
OIR    2025250     91400   19.3700 -113.0400       7.8       174       121        60
OIR    2025250     91400   19.3700 -113.0500       7.8       174       120        60
OIR    2025250     91400   19.3700 -113.0600       7.8       175       120        60
OIR    2025250     91400   19.3700 -113.0700       7.8       175       120        60
OIR    2025250     91400   19.3700 -113.0800       7.8       175       119        60
OIR    2025250     91400   19.3700 -113.0900       7.8       175       117        60
OIR    2025250     91400   19.3700 -113.1000       7.8       175       116        60
OIR    2025250     91400   19.3700 -113.1100       7.8       175       115        60
OIR    2025250     91400   19.3700 -113.1200       7.8       175       114        60
OIR    2025250     91400   19.3700 -113.1300       7.8       175       114        60
OIR    2025250     91400   19.3700 -113.1400       7.8       175       114        60
OIR    2025250     91400   19.3700 -113.1500       7.8       175       114        60
OIR    2025250     91400   19.3700 -113.1600       7.9       175       113        60
OIR    2025250     91400   19.3700 -113.1700       7.9       175       113        60
OIR    2025250     91400   19.3700 -113.1800       7.9       175       112        60
OIR    2025250     91400   19.3700 -113.1900       7.9       175       111        60
OIR    2025250     91400   19.3700 -113.2000       7.9       176       110        60
OIR    2025250     91400   19.3700 -113.2100       7.9       176       109        60
OIR    2025250     91400   19.3700 -113.2200       7.9       175       108        60
OIR    2025250     91400   19.3700 -113.2300       7.9       175       108        60
OIR    2025250     91400   19.3700 -113.2400       7.9       175       107        60
OIR    2025250     91400   19.3700 -113.2500       7.9       175       108        60
OIR    2025250     91400   19.3700 -113.2600       7.9       175       108        60
OIR    2025250     91400   19.3700 -113.2700       7.9       175       107        60
OIR    2025250     91400   19.3700 -113.2800       8.0       175       107        60
OIR    2025250     91400   19.3700 -113.2900       8.0       175       107        60
OIR    2025250     91400   19.3700 -113.3000       8.0       175       107        60
OIR    2025250     91400   19.3700 -113.3100       8.0       175       105        60
OIR    2025250     91400   19.3700 -113.3200       8.0       175       104        60
OIR    2025250     91400   19.3700 -113.3300       8.0       175       104        60
OIR    2025250     91400   19.3700 -113.3400       8.0       175       104        60
OIR    2025250     91400   19.3700 -113.3500       8.0       175       104        60
OIR    2025250     91400   19.3700 -113.3600       8.1       175       104        60
OIR    2025250     91400   19.3700 -113.3700       8.1       175       104        60
OIR    2025250     91400   19.3700 -113.3800       8.1       175       104        60
OIR    2025250     91400   19.3700 -113.3900       8.1       175       105        60
OIR    2025250     91400   19.3700 -113.4000       8.2       175       105        60
OIR    2025250     91400   19.3700 -113.4100       8.2       175       104        60
OIR    2025250     91400   19.3700 -113.4200       8.3       175       104        60
OIR    2025250     91400   19.3700 -113.4300       8.3       175       104        60
OIR    2025250     91400   19.3700 -113.4400       8.3       176       104        60
OIR    2025250     91400   19.3700 -113.4500       8.4       176       104        60
OIR    2025250     91400   19.3700 -113.4600       8.4       176       104        60
OIR    2025250     91400   19.3700 -113.4700       8.5       176       104        60
OIR    2025250     91400   19.3700 -113.4800       8.5       176       104        60
OIR    2025250     91400   19.3700 -113.4900       8.5       176       104        60
OIR    2025250     91400   19.3700 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.3700 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.3700 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.3700 -113.5300       8.6       176       104        60
OIR    2025250     91400   19.3700 -113.5400       8.6       176       104        60
OIR    2025250     91400   19.3700 -113.5500       8.7       176       104        60
OIR    2025250     91400   19.3700 -113.5600       8.7       177       104        60
OIR    2025250     91400   19.3700 -113.5700       8.8       177       104        60
OIR    2025250     91400   19.3700 -113.5800       8.8       177       104        60
OIR    2025250     91400   19.3700 -113.5900       8.8       177       104        60
OIR    2025250     91400   19.3700 -113.6000       8.8       177       104        60
OIR    2025250     91400   19.3700 -113.6100       8.9       177       104        60
OIR    2025250     91400   19.3700 -113.6200       8.9       177       104        60
OIR    2025250     91400   19.3700 -113.6300       8.9       177       104        60
OIR    2025250     91400   19.3700 -113.6400       8.9       177       104        60
OIR    2025250     91400   19.3700 -113.6500       8.9       177       104        60
OIR    2025250     91400   19.3700 -113.6600       8.9       178       104        60
OIR    2025250     91400   19.3700 -113.6700       9.0       178       104        60
OIR    2025250     91400   19.3700 -113.6800       9.0       178       104        60
OIR    2025250     91400   19.3700 -113.6900       9.0       178       104        60
OIR    2025250     91400   19.3700 -113.7000       9.0       178       104        60
OIR    2025250     91400   19.3700 -113.7100       9.0       178       104        60
OIR    2025250     91400   19.3700 -113.7200       9.0       178       104        60
OIR    2025250     91400   19.3700 -113.7300       9.1       178       104        60
OIR    2025250     91400   19.3700 -113.7400       9.1       178       104        60
OIR    2025250     91400   19.3700 -113.7500       9.1       179       105        60
OIR    2025250     91400   19.3700 -113.7600       9.2       179       105        60
OIR    2025250     91400   19.3700 -113.7700       9.2       179       107        60
OIR    2025250     91400   19.3700 -113.7800       9.2       179       108        60
OIR    2025250     91400   19.3700 -113.7900       9.3       179       108        60
OIR    2025250     91400   19.3700 -113.8000       9.3       179       108        60
OIR    2025250     91400   19.3700 -113.8100       9.3       180       108        60
OIR    2025250     91400   19.3700 -113.8200       9.3       180       108        60
OIR    2025250     91400   19.3700 -113.8300       9.3       180       109        60
OIR    2025250     91400   19.3700 -113.8400       9.3       180       109        60
OIR    2025250     91400   19.3700 -113.8500       9.3       180       109        60
OIR    2025250     91400   19.3700 -113.8600       9.4       180       109        60
OIR    2025250     91400   19.3700 -113.8700       9.4       180       110        60
OIR    2025250     91400   19.3700 -113.8800       9.4       181       111        60
OIR    2025250     91400   19.3700 -113.8900       9.4       181       111        60
OIR    2025250     91400   19.3700 -113.9000       9.4       181       111        60
OIR    2025250     91400   19.3700 -113.9100       9.4       181       110        60
OIR    2025250     91400   19.3700 -113.9200       9.4       181       110        60
OIR    2025250     91400   19.3700 -113.9300       9.5       181       109        60
OIR    2025250     91400   19.3700 -113.9400       9.5       182       109        60
OIR    2025250     91400   19.3700 -113.9500       9.6       182       109        60
OIR    2025250     91400   19.3700 -113.9600       9.6       183       110        60
OIR    2025250     91400   19.3700 -113.9700       9.7       183       110        60
OIR    2025250     91400   19.3700 -113.9800       9.7       183       110        60
OIR    2025250     91400   19.3700 -113.9900       9.7       184       110        60
OIR    2025250     91400   19.3700 -114.0000       9.8       184       111        60
OIR    2025250     91400   19.3700 -114.0100       9.8       184       112        60
OIR    2025250     91400   19.3700 -114.0200       9.8       184       112        60
OIR    2025250     91400   19.3700 -114.0300       9.8       184       111        60
OIR    2025250     91400   19.3700 -114.0400       9.8       184       111        60
OIR    2025250     91400   19.3700 -114.0500       9.8       185       111        60
OIR    2025250     91400   19.3700 -114.0600       9.8       185       111        60
OIR    2025250     91400   19.3700 -114.0700       9.8       185       112        60
OIR    2025250     91400   19.3700 -114.0800       9.9       185       113        60
OIR    2025250     91400   19.3700 -114.0900       9.9       185       113        60
OIR    2025250     91400   19.3700 -114.1000       9.9       186       113        60
OIR    2025250     91400   19.3700 -114.1100       9.9       186       113        60
OIR    2025250     91400   19.3700 -114.1200       9.9       186       113        60
OIR    2025250     91400   19.3700 -114.1300      10.0       186       113        60
OIR    2025250     91400   19.3700 -114.1400      10.0       187       112        60
OIR    2025250     91400   19.3700 -114.1500      10.0       187       112        60
OIR    2025250     91400   19.3700 -114.1600      10.0       187       112        60
OIR    2025250     91400   19.3700 -114.1700      10.0       187       112        60
OIR    2025250     91400   19.3700 -114.1800      10.0       188       112        60
OIR    2025250     91400   19.3700 -114.1900      10.0       188       111        60
OIR    2025250     91400   19.3700 -114.2000       9.9       188       111        60
OIR    2025250     91400   19.3700 -114.2100       9.9       188       112        60
OIR    2025250     91400   19.3700 -114.2200       9.9       189       114        60
OIR    2025250     91400   19.3700 -114.2300       9.8       189       113        60
OIR    2025250     91400   19.3700 -114.2400       9.8       190       113        60
OIR    2025250     91400   19.3700 -114.2500       9.7       191       113        60
OIR    2025250     91400   19.3700 -114.2600       9.7       191       113        60
OIR    2025250     91400   19.3700 -114.2700       9.6       191       113        60
OIR    2025250     91400   19.3700 -114.2800       9.6       192       113        60
OIR    2025250     91400   19.3700 -114.2900       9.6       192       114        60
OIR    2025250     91400   19.3700 -114.3000       9.5       193       116        60
OIR    2025250     91400   19.3700 -114.3100       9.4       194       120        60
OIR    2025250     91400   19.3700 -114.3200       9.4       194       123        60
OIR    2025250     91400   19.3700 -114.3300       9.4       195       125        60
OIR    2025250     91400   19.3700 -114.3400       9.3       196       126        60
OIR    2025250     91400   19.3700 -114.3500       9.3       196       128        60
OIR    2025250     91400   19.3700 -114.3600       9.3       196       129        60
OIR    2025250     91400   19.3700 -114.3700       9.4       195       129        60
OIR    2025250     91400   19.3700 -114.3800       9.5       195       129        60
OIR    2025250     91400   19.3700 -114.3900       9.5       194       128        60
OIR    2025250     91400   19.3700 -114.4000       9.5       193       126        60
OIR    2025250     91400   19.3700 -114.4100       9.5       193       126        60
OIR    2025250     91400   19.3700 -114.4200       9.6       191       127        60
OIR    2025250     91400   19.3700 -114.4300       9.7       190       128        60
OIR    2025250     91400   19.3700 -114.4400       9.7       189       129        60
OIR    2025250     91400   19.3700 -114.4500       9.7       189       129        60
OIR    2025250     91400   19.3700 -114.4600       9.7       188       131        60
OIR    2025250     91400   19.3700 -114.4700       9.7       188       133        60
OIR    2025250     91400   19.3700 -114.4800       9.7       188       134        60
OIR    2025250     91400   19.3700 -114.4900       9.7       187       134        60
OIR    2025250     91400   19.3700 -114.5000       9.6       187       133        60
OIR    2025250     91400   19.3700 -114.5100       9.6       187       132        60
OIR    2025250     91400   19.3700 -114.5200       9.6       186       134        60
OIR    2025250     91400   19.3700 -114.5300       9.5       186       137        60
OIR    2025250     91400   19.3700 -114.5400       9.5       186       139        60
OIR    2025250     91400   19.3700 -114.5500       9.4       185       138        60
OIR    2025250     91400   19.3700 -114.5600       9.3       185       137        60
OIR    2025250     91400   19.3700 -114.5700       9.1       184       135        60
OIR    2025250     91400   19.3700 -114.5800       8.8       182       134        60
OIR    2025250     91400   19.3700 -114.5900       8.0       178       134        60
OIR    2025250     91400   19.3700 -114.6000       7.1       173       136        60
OIR    2025250     91400   19.3700 -114.6100       6.8       170       138        60
OIR    2025250     91400   19.3700 -114.6200       6.8       170       141        60
OIR    2025250     91400   19.3700 -116.2500       9.4       180       142        60
OIR    2025250     91400   19.3700 -116.2600       9.2       180       142        60
OIR    2025250     91400   19.3700 -116.2900       8.9       180       141        60
OIR    2025250     91400   19.3600 -112.9300       7.8       173       134        60
OIR    2025250     91400   19.3600 -112.9400       7.8       173       132        60
OIR    2025250     91400   19.3600 -112.9500       7.8       173       132        60
OIR    2025250     91400   19.3600 -112.9600       7.8       173       131        60
OIR    2025250     91400   19.3600 -112.9700       7.8       173       130        60
OIR    2025250     91400   19.3600 -112.9800       7.8       174       130        60
OIR    2025250     91400   19.3600 -112.9900       7.8       174       134        60
OIR    2025250     91400   19.3600 -113.0000       7.8       174       137        60
OIR    2025250     91400   19.3600 -113.0100       7.8       174       133        60
OIR    2025250     91400   19.3600 -113.0200       7.8       174       126        60
OIR    2025250     91400   19.3600 -113.0300       7.8       174       121        60
OIR    2025250     91400   19.3600 -113.0400       7.8       174       121        60
OIR    2025250     91400   19.3600 -113.0500       7.8       174       120        60
OIR    2025250     91400   19.3600 -113.0600       7.8       175       119        60
OIR    2025250     91400   19.3600 -113.0700       7.8       175       119        60
OIR    2025250     91400   19.3600 -113.0800       7.8       175       116        60
OIR    2025250     91400   19.3600 -113.0900       7.8       175       116        60
OIR    2025250     91400   19.3600 -113.1000       7.8       175       114        60
OIR    2025250     91400   19.3600 -113.1100       7.8       175       112        60
OIR    2025250     91400   19.3600 -113.1200       7.8       175       111        60
OIR    2025250     91400   19.3600 -113.1300       7.8       175       112        60
OIR    2025250     91400   19.3600 -113.1400       7.9       175       112        60
OIR    2025250     91400   19.3600 -113.1500       7.9       175       112        60
OIR    2025250     91400   19.3600 -113.1600       7.9       175       112        60
OIR    2025250     91400   19.3600 -113.1700       7.9       175       112        60
OIR    2025250     91400   19.3600 -113.1800       7.9       175       112        60
OIR    2025250     91400   19.3600 -113.1900       7.9       176       111        60
OIR    2025250     91400   19.3600 -113.2000       7.9       176       110        60
OIR    2025250     91400   19.3600 -113.2100       7.9       176       109        60
OIR    2025250     91400   19.3600 -113.2200       7.9       176       108        60
OIR    2025250     91400   19.3600 -113.2300       7.9       175       107        60
OIR    2025250     91400   19.3600 -113.2400       7.9       175       107        60
OIR    2025250     91400   19.3600 -113.2500       7.9       175       105        60
OIR    2025250     91400   19.3600 -113.2600       7.9       175       105        60
OIR    2025250     91400   19.3600 -113.2700       7.9       175       105        60
OIR    2025250     91400   19.3600 -113.2800       8.0       175       104        60
OIR    2025250     91400   19.3600 -113.2900       8.0       175       105        60
OIR    2025250     91400   19.3600 -113.3000       8.0       175       105        60
OIR    2025250     91400   19.3600 -113.3100       8.0       175       104        60
OIR    2025250     91400   19.3600 -113.3200       8.0       175       104        60
OIR    2025250     91400   19.3600 -113.3300       8.0       175       104        60
OIR    2025250     91400   19.3600 -113.3400       8.0       175       104        60
OIR    2025250     91400   19.3600 -113.3500       8.1       175       104        60
OIR    2025250     91400   19.3600 -113.3600       8.1       175       104        60
OIR    2025250     91400   19.3600 -113.3700       8.1       175       104        60
OIR    2025250     91400   19.3600 -113.3800       8.1       175       104        60
OIR    2025250     91400   19.3600 -113.3900       8.2       175       104        60
OIR    2025250     91400   19.3600 -113.4000       8.2       175       104        60
OIR    2025250     91400   19.3600 -113.4100       8.2       175       104        60
OIR    2025250     91400   19.3600 -113.4200       8.3       175       104        60
OIR    2025250     91400   19.3600 -113.4300       8.3       176       104        60
OIR    2025250     91400   19.3600 -113.4400       8.3       176       104        60
OIR    2025250     91400   19.3600 -113.4500       8.4       176       104        60
OIR    2025250     91400   19.3600 -113.4600       8.4       176       104        60
OIR    2025250     91400   19.3600 -113.4700       8.5       176       104        60
OIR    2025250     91400   19.3600 -113.4800       8.5       176       104        60
OIR    2025250     91400   19.3600 -113.4900       8.5       176       104        60
OIR    2025250     91400   19.3600 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.3600 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.3600 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.3600 -113.5300       8.6       176       104        60
OIR    2025250     91400   19.3600 -113.5400       8.7       176       104        60
OIR    2025250     91400   19.3600 -113.5500       8.7       176       104        60
OIR    2025250     91400   19.3600 -113.5600       8.7       177       104        60
OIR    2025250     91400   19.3600 -113.5700       8.8       177       104        60
OIR    2025250     91400   19.3600 -113.5800       8.8       177       104        60
OIR    2025250     91400   19.3600 -113.5900       8.8       177       104        60
OIR    2025250     91400   19.3600 -113.6000       8.8       177       104        60
OIR    2025250     91400   19.3600 -113.6100       8.9       177       104        60
OIR    2025250     91400   19.3600 -113.6200       8.9       177       104        60
OIR    2025250     91400   19.3600 -113.6300       8.9       177       104        60
OIR    2025250     91400   19.3600 -113.6400       8.9       177       104        60
OIR    2025250     91400   19.3600 -113.6500       8.9       178       104        60
OIR    2025250     91400   19.3600 -113.6600       9.0       178       104        60
OIR    2025250     91400   19.3600 -113.6700       9.0       178       105        60
OIR    2025250     91400   19.3600 -113.6800       9.0       178       104        60
OIR    2025250     91400   19.3600 -113.6900       9.0       178       104        60
OIR    2025250     91400   19.3600 -113.7000       9.0       178       104        60
OIR    2025250     91400   19.3600 -113.7100       9.0       178       104        60
OIR    2025250     91400   19.3600 -113.7200       9.1       178       104        60
OIR    2025250     91400   19.3600 -113.7300       9.1       178       104        60
OIR    2025250     91400   19.3600 -113.7400       9.1       178       104        60
OIR    2025250     91400   19.3600 -113.7500       9.2       179       105        60
OIR    2025250     91400   19.3600 -113.7600       9.2       179       107        60
OIR    2025250     91400   19.3600 -113.7700       9.2       179       107        60
OIR    2025250     91400   19.3600 -113.7800       9.3       179       108        60
OIR    2025250     91400   19.3600 -113.7900       9.3       179       109        60
OIR    2025250     91400   19.3600 -113.8000       9.3       179       109        60
OIR    2025250     91400   19.3600 -113.8100       9.3       180       109        60
OIR    2025250     91400   19.3600 -113.8200       9.3       180       109        60
OIR    2025250     91400   19.3600 -113.8300       9.3       180       110        60
OIR    2025250     91400   19.3600 -113.8400       9.3       180       110        60
OIR    2025250     91400   19.3600 -113.8500       9.4       180       110        60
OIR    2025250     91400   19.3600 -113.8600       9.4       180       109        60
OIR    2025250     91400   19.3600 -113.8700       9.4       180       110        60
OIR    2025250     91400   19.3600 -113.8800       9.4       181       111        60
OIR    2025250     91400   19.3600 -113.8900       9.4       181       111        60
OIR    2025250     91400   19.3600 -113.9000       9.4       181       111        60
OIR    2025250     91400   19.3600 -113.9100       9.4       181       111        60
OIR    2025250     91400   19.3600 -113.9200       9.4       181       110        60
OIR    2025250     91400   19.3600 -113.9300       9.5       182       109        60
OIR    2025250     91400   19.3600 -113.9400       9.5       182       109        60
OIR    2025250     91400   19.3600 -113.9500       9.6       183       109        60
OIR    2025250     91400   19.3600 -113.9600       9.7       183       110        60
OIR    2025250     91400   19.3600 -113.9700       9.7       183       111        60
OIR    2025250     91400   19.3600 -113.9800       9.8       184       111        60
OIR    2025250     91400   19.3600 -113.9900       9.8       184       110        60
OIR    2025250     91400   19.3600 -114.0000       9.8       184       110        60
OIR    2025250     91400   19.3600 -114.0100       9.8       184       111        60
OIR    2025250     91400   19.3600 -114.0200       9.8       184       111        60
OIR    2025250     91400   19.3600 -114.0300       9.8       184       111        60
OIR    2025250     91400   19.3600 -114.0400       9.9       185       112        60
OIR    2025250     91400   19.3600 -114.0500       9.9       185       112        60
OIR    2025250     91400   19.3600 -114.0600       9.9       185       113        60
OIR    2025250     91400   19.3600 -114.0700       9.9       185       113        60
OIR    2025250     91400   19.3600 -114.0800       9.9       185       113        60
OIR    2025250     91400   19.3600 -114.0900      10.0       186       113        60
OIR    2025250     91400   19.3600 -114.1000      10.0       186       113        60
OIR    2025250     91400   19.3600 -114.1100      10.0       186       113        60
OIR    2025250     91400   19.3600 -114.1200      10.0       186       113        60
OIR    2025250     91400   19.3600 -114.1300      10.0       186       113        60
OIR    2025250     91400   19.3600 -114.1400      10.0       187       113        60
OIR    2025250     91400   19.3600 -114.1500      10.0       187       113        60
OIR    2025250     91400   19.3600 -114.1600      10.0       187       113        60
OIR    2025250     91400   19.3600 -114.1700      10.0       187       113        60
OIR    2025250     91400   19.3600 -114.1800      10.0       187       114        60
OIR    2025250     91400   19.3600 -114.1900      10.0       188       113        60
OIR    2025250     91400   19.3600 -114.2000      10.0       188       112        60
OIR    2025250     91400   19.3600 -114.2100      10.0       188       113        60
OIR    2025250     91400   19.3600 -114.2200      10.0       189       114        60
OIR    2025250     91400   19.3600 -114.2300       9.9       189       114        60
OIR    2025250     91400   19.3600 -114.2400       9.8       190       114        60
OIR    2025250     91400   19.3600 -114.2500       9.8       190       114        60
OIR    2025250     91400   19.3600 -114.2600       9.7       191       115        60
OIR    2025250     91400   19.3600 -114.2700       9.7       191       115        60
OIR    2025250     91400   19.3600 -114.2800       9.7       191       115        60
OIR    2025250     91400   19.3600 -114.2900       9.7       192       115        60
OIR    2025250     91400   19.3600 -114.3000       9.6       192       117        60
OIR    2025250     91400   19.3600 -114.3100       9.5       193       121        60
OIR    2025250     91400   19.3600 -114.3200       9.5       193       124        60
OIR    2025250     91400   19.3600 -114.3300       9.5       194       126        60
OIR    2025250     91400   19.3600 -114.3400       9.5       194       127        60
OIR    2025250     91400   19.3600 -114.3500       9.5       194       129        60
OIR    2025250     91400   19.3600 -114.3600       9.5       194       130        60
OIR    2025250     91400   19.3600 -114.3700       9.6       193       130        60
OIR    2025250     91400   19.3600 -114.3800       9.6       193       130        60
OIR    2025250     91400   19.3600 -114.3900       9.6       192       130        60
OIR    2025250     91400   19.3600 -114.4000       9.7       192       129        60
OIR    2025250     91400   19.3600 -114.4100       9.7       191       128        60
OIR    2025250     91400   19.3600 -114.4200       9.8       190       126        60
OIR    2025250     91400   19.3600 -114.4300       9.8       190       126        60
OIR    2025250     91400   19.3600 -114.4400       9.8       189       127        60
OIR    2025250     91400   19.3600 -114.4500       9.8       188       128        60
OIR    2025250     91400   19.3600 -114.4600       9.8       188       131        60
OIR    2025250     91400   19.3600 -114.4700       9.8       188       134        60
OIR    2025250     91400   19.3600 -114.4800       9.8       187       135        60
OIR    2025250     91400   19.3600 -114.4900       9.8       187       134        60
OIR    2025250     91400   19.3600 -114.5000       9.7       187       134        60
OIR    2025250     91400   19.3600 -114.5100       9.7       187       134        60
OIR    2025250     91400   19.3600 -114.5200       9.6       186       134        60
OIR    2025250     91400   19.3600 -114.5300       9.6       186       134        60
OIR    2025250     91400   19.3600 -114.5400       9.5       186       134        60
OIR    2025250     91400   19.3600 -114.5500       9.5       185       135        60
OIR    2025250     91400   19.3600 -114.5600       9.4       185       136        60
OIR    2025250     91400   19.3600 -114.5700       9.2       184       136        60
OIR    2025250     91400   19.3600 -114.5800       8.9       183       136        60
OIR    2025250     91400   19.3600 -114.5900       8.3       180       136        60
OIR    2025250     91400   19.3600 -114.6000       7.4       174       137        60
OIR    2025250     91400   19.3600 -114.6100       6.9       170       139        60
OIR    2025250     91400   19.3600 -114.6200       6.8       170       140        60
OIR    2025250     91400   19.3600 -114.6300       6.8       169       141        60
OIR    2025250     91400   19.3500 -112.9300       7.8       173       135        60
OIR    2025250     91400   19.3500 -112.9400       7.8       173       132        60
OIR    2025250     91400   19.3500 -112.9500       7.8       173       132        60
OIR    2025250     91400   19.3500 -112.9600       7.8       173       132        60
OIR    2025250     91400   19.3500 -112.9700       7.8       173       132        60
OIR    2025250     91400   19.3500 -112.9800       7.8       174       131        60
OIR    2025250     91400   19.3500 -112.9900       7.8       174       131        60
OIR    2025250     91400   19.3500 -113.0000       7.8       174       133        60
OIR    2025250     91400   19.3500 -113.0100       7.8       174       131        60
OIR    2025250     91400   19.3500 -113.0200       7.8       174       125        60
OIR    2025250     91400   19.3500 -113.0300       7.8       174       121        60
OIR    2025250     91400   19.3500 -113.0400       7.8       174       121        60
OIR    2025250     91400   19.3500 -113.0500       7.8       175       121        60
OIR    2025250     91400   19.3500 -113.0600       7.8       175       120        60
OIR    2025250     91400   19.3500 -113.0700       7.8       175       120        60
OIR    2025250     91400   19.3500 -113.0800       7.8       175       117        60
OIR    2025250     91400   19.3500 -113.0900       7.8       175       116        60
OIR    2025250     91400   19.3500 -113.1000       7.8       175       114        60
OIR    2025250     91400   19.3500 -113.1100       7.8       175       113        60
OIR    2025250     91400   19.3500 -113.1200       7.9       175       111        60
OIR    2025250     91400   19.3500 -113.1300       7.9       175       112        60
OIR    2025250     91400   19.3500 -113.1400       7.9       175       112        60
OIR    2025250     91400   19.3500 -113.1500       7.9       175       112        60
OIR    2025250     91400   19.3500 -113.1600       7.9       175       112        60
OIR    2025250     91400   19.3500 -113.1700       7.9       175       112        60
OIR    2025250     91400   19.3500 -113.1800       7.9       175       111        60
OIR    2025250     91400   19.3500 -113.1900       7.9       176       111        60
OIR    2025250     91400   19.3500 -113.2000       7.9       176       110        60
OIR    2025250     91400   19.3500 -113.2100       7.9       176       109        60
OIR    2025250     91400   19.3500 -113.2200       7.9       176       108        60
OIR    2025250     91400   19.3500 -113.2300       7.9       175       107        60
OIR    2025250     91400   19.3500 -113.2400       7.9       175       105        60
OIR    2025250     91400   19.3500 -113.2500       7.9       175       105        60
OIR    2025250     91400   19.3500 -113.2600       7.9       175       104        60
OIR    2025250     91400   19.3500 -113.2700       8.0       175       104        60
OIR    2025250     91400   19.3500 -113.2800       8.0       175       104        60
OIR    2025250     91400   19.3500 -113.2900       8.0       175       104        60
OIR    2025250     91400   19.3500 -113.3000       8.0       175       104        60
OIR    2025250     91400   19.3500 -113.3100       8.0       175       104        60
OIR    2025250     91400   19.3500 -113.3200       8.0       175       104        60
OIR    2025250     91400   19.3500 -113.3300       8.0       175       104        60
OIR    2025250     91400   19.3500 -113.3400       8.0       175       103        60
OIR    2025250     91400   19.3500 -113.3500       8.1       175       103        60
OIR    2025250     91400   19.3500 -113.3600       8.1       175       103        60
OIR    2025250     91400   19.3500 -113.3700       8.1       175       103        60
OIR    2025250     91400   19.3500 -113.3800       8.2       175       103        60
OIR    2025250     91400   19.3500 -113.3900       8.2       175       103        60
OIR    2025250     91400   19.3500 -113.4000       8.2       175       103        60
OIR    2025250     91400   19.3500 -113.4100       8.2       175       104        60
OIR    2025250     91400   19.3500 -113.4200       8.3       175       104        60
OIR    2025250     91400   19.3500 -113.4300       8.3       176       104        60
OIR    2025250     91400   19.3500 -113.4400       8.4       176       104        60
OIR    2025250     91400   19.3500 -113.4500       8.4       176       104        60
OIR    2025250     91400   19.3500 -113.4600       8.4       176       104        60
OIR    2025250     91400   19.3500 -113.4700       8.5       176       104        60
OIR    2025250     91400   19.3500 -113.4800       8.5       176       104        60
OIR    2025250     91400   19.3500 -113.4900       8.5       176       103        60
OIR    2025250     91400   19.3500 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.3500 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.3500 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.3500 -113.5300       8.6       176       104        60
OIR    2025250     91400   19.3500 -113.5400       8.7       176       104        60
OIR    2025250     91400   19.3500 -113.5500       8.7       176       104        60
OIR    2025250     91400   19.3500 -113.5600       8.7       177       104        60
OIR    2025250     91400   19.3500 -113.5700       8.8       177       104        60
OIR    2025250     91400   19.3500 -113.5800       8.8       177       104        60
OIR    2025250     91400   19.3500 -113.5900       8.8       177       104        60
OIR    2025250     91400   19.3500 -113.6000       8.9       177       104        60
OIR    2025250     91400   19.3500 -113.6100       8.9       177       104        60
OIR    2025250     91400   19.3500 -113.6200       8.9       177       104        60
OIR    2025250     91400   19.3500 -113.6300       8.9       177       104        60
OIR    2025250     91400   19.3500 -113.6400       8.9       177       104        60
OIR    2025250     91400   19.3500 -113.6500       9.0       178       104        60
OIR    2025250     91400   19.3500 -113.6600       9.0       178       104        60
OIR    2025250     91400   19.3500 -113.6700       9.0       178       104        60
OIR    2025250     91400   19.3500 -113.6800       9.0       178       105        60
OIR    2025250     91400   19.3500 -113.6900       9.0       178       104        60
OIR    2025250     91400   19.3500 -113.7000       9.0       178       104        60
OIR    2025250     91400   19.3500 -113.7100       9.0       178       104        60
OIR    2025250     91400   19.3500 -113.7200       9.1       178       104        60
OIR    2025250     91400   19.3500 -113.7300       9.1       178       105        60
OIR    2025250     91400   19.3500 -113.7400       9.2       179       105        60
OIR    2025250     91400   19.3500 -113.7500       9.2       179       105        60
OIR    2025250     91400   19.3500 -113.7600       9.2       179       107        60
OIR    2025250     91400   19.3500 -113.7700       9.3       179       108        60
OIR    2025250     91400   19.3500 -113.7800       9.3       179       108        60
OIR    2025250     91400   19.3500 -113.7900       9.3       179       109        60
OIR    2025250     91400   19.3500 -113.8000       9.3       180       109        60
OIR    2025250     91400   19.3500 -113.8100       9.3       180       109        60
OIR    2025250     91400   19.3500 -113.8200       9.3       180       110        60
OIR    2025250     91400   19.3500 -113.8300       9.3       180       111        60
OIR    2025250     91400   19.3500 -113.8400       9.4       180       111        60
OIR    2025250     91400   19.3500 -113.8500       9.4       180       110        60
OIR    2025250     91400   19.3500 -113.8600       9.4       180       109        60
OIR    2025250     91400   19.3500 -113.8700       9.4       180       110        60
OIR    2025250     91400   19.3500 -113.8800       9.4       181       110        60
OIR    2025250     91400   19.3500 -113.8900       9.4       181       111        60
OIR    2025250     91400   19.3500 -113.9000       9.4       181       111        60
OIR    2025250     91400   19.3500 -113.9100       9.4       181       111        60
OIR    2025250     91400   19.3500 -113.9200       9.4       181       110        60
OIR    2025250     91400   19.3500 -113.9300       9.5       182       110        60
OIR    2025250     91400   19.3500 -113.9400       9.6       182       109        60
OIR    2025250     91400   19.3500 -113.9500       9.7       183       109        60
OIR    2025250     91400   19.3500 -113.9600       9.7       183       111        60
OIR    2025250     91400   19.3500 -113.9700       9.8       184       112        60
OIR    2025250     91400   19.3500 -113.9800       9.8       184       112        60
OIR    2025250     91400   19.3500 -113.9900       9.8       184       110        60
OIR    2025250     91400   19.3500 -114.0000       9.8       184       110        60
OIR    2025250     91400   19.3500 -114.0100       9.8       184       110        60
OIR    2025250     91400   19.3500 -114.0200       9.9       184       111        60
OIR    2025250     91400   19.3500 -114.0300       9.9       185       111        60
OIR    2025250     91400   19.3500 -114.0400       9.9       185       111        60
OIR    2025250     91400   19.3500 -114.0500       9.9       185       112        60
OIR    2025250     91400   19.3500 -114.0600       9.9       185       113        60
OIR    2025250     91400   19.3500 -114.0700      10.0       185       113        60
OIR    2025250     91400   19.3500 -114.0800      10.0       185       112        60
OIR    2025250     91400   19.3500 -114.0900      10.0       186       111        60
OIR    2025250     91400   19.3500 -114.1000      10.0       186       112        60
OIR    2025250     91400   19.3500 -114.1100      10.0       186       112        60
OIR    2025250     91400   19.3500 -114.1200      10.1       186       113        60
OIR    2025250     91400   19.3500 -114.1300      10.1       187       114        60
OIR    2025250     91400   19.3500 -114.1400      10.1       187       114        60
OIR    2025250     91400   19.3500 -114.1500      10.1       187       114        60
OIR    2025250     91400   19.3500 -114.1600      10.1       187       114        60
OIR    2025250     91400   19.3500 -114.1700      10.1       187       114        60
OIR    2025250     91400   19.3500 -114.1800      10.1       187       114        60
OIR    2025250     91400   19.3500 -114.1900      10.1       188       114        60
OIR    2025250     91400   19.3500 -114.2000      10.1       188       113        60
OIR    2025250     91400   19.3500 -114.2100      10.1       188       114        60
OIR    2025250     91400   19.3500 -114.2200      10.0       189       115        60
OIR    2025250     91400   19.3500 -114.2300      10.0       189       115        60
OIR    2025250     91400   19.3500 -114.2400       9.9       190       114        60
OIR    2025250     91400   19.3500 -114.2500       9.8       190       114        60
OIR    2025250     91400   19.3500 -114.2600       9.8       191       115        60
OIR    2025250     91400   19.3500 -114.2700       9.8       191       116        60
OIR    2025250     91400   19.3500 -114.2800       9.7       191       116        60
OIR    2025250     91400   19.3500 -114.2900       9.7       191       116        60
OIR    2025250     91400   19.3500 -114.3000       9.7       191       117        60
OIR    2025250     91400   19.3500 -114.3100       9.7       192       120        60
OIR    2025250     91400   19.3500 -114.3200       9.7       192       123        60
OIR    2025250     91400   19.3500 -114.3300       9.7       192       124        60
OIR    2025250     91400   19.3500 -114.3400       9.7       192       126        60
OIR    2025250     91400   19.3500 -114.3500       9.7       192       128        60
OIR    2025250     91400   19.3500 -114.3600       9.7       192       131        60
OIR    2025250     91400   19.3500 -114.3700       9.7       191       131        60
OIR    2025250     91400   19.3500 -114.3800       9.8       191       131        60
OIR    2025250     91400   19.3500 -114.3900       9.8       191       131        60
OIR    2025250     91400   19.3500 -114.4000       9.8       190       131        60
OIR    2025250     91400   19.3500 -114.4100       9.8       190       130        60
OIR    2025250     91400   19.3500 -114.4200       9.9       190       128        60
OIR    2025250     91400   19.3500 -114.4300       9.9       189       127        60
OIR    2025250     91400   19.3500 -114.4400       9.9       189       127        60
OIR    2025250     91400   19.3500 -114.4500       9.9       188       128        60
OIR    2025250     91400   19.3500 -114.4600       9.9       188       130        60
OIR    2025250     91400   19.3500 -114.4700       9.9       187       133        60
OIR    2025250     91400   19.3500 -114.4800       9.9       187       135        60
OIR    2025250     91400   19.3500 -114.4900       9.9       187       135        60
OIR    2025250     91400   19.3500 -114.5000       9.8       187       134        60
OIR    2025250     91400   19.3500 -114.5100       9.8       187       134        60
OIR    2025250     91400   19.3500 -114.5200       9.7       186       134        60
OIR    2025250     91400   19.3500 -114.5300       9.7       186       133        60
OIR    2025250     91400   19.3500 -114.5400       9.6       186       132        60
OIR    2025250     91400   19.3500 -114.5500       9.6       186       133        60
OIR    2025250     91400   19.3500 -114.5600       9.5       185       135        60
OIR    2025250     91400   19.3500 -114.5700       9.4       185       136        60
OIR    2025250     91400   19.3500 -114.5800       9.0       183       136        60
OIR    2025250     91400   19.3500 -114.5900       8.4       181       137        60
OIR    2025250     91400   19.3500 -114.6000       7.7       177       138        60
OIR    2025250     91400   19.3500 -114.6100       7.1       171       140        60
OIR    2025250     91400   19.3500 -114.6200       6.9       170       140        60
OIR    2025250     91400   19.3500 -114.6300       6.8       169       139        60
OIR    2025250     91400   19.3500 -114.6400       6.8       168       139        60
OIR    2025250     91400   19.3500 -114.6500       6.7       167       139        60
OIR    2025250     91400   19.3500 -114.6600       6.6       167       140        60
OIR    2025250     91400   19.3400 -112.8900       7.8       172       139        60
OIR    2025250     91400   19.3400 -112.9000       7.8       172       138        60
OIR    2025250     91400   19.3400 -112.9100       7.8       172       140        60
OIR    2025250     91400   19.3400 -112.9200       7.8       172       140        60
OIR    2025250     91400   19.3400 -112.9300       7.8       173       136        60
OIR    2025250     91400   19.3400 -112.9400       7.8       173       133        60
OIR    2025250     91400   19.3400 -112.9500       7.8       173       133        60
OIR    2025250     91400   19.3400 -112.9600       7.8       173       133        60
OIR    2025250     91400   19.3400 -112.9700       7.8       173       133        60
OIR    2025250     91400   19.3400 -112.9800       7.8       174       132        60
OIR    2025250     91400   19.3400 -112.9900       7.8       174       131        60
OIR    2025250     91400   19.3400 -113.0000       7.8       174       128        60
OIR    2025250     91400   19.3400 -113.0100       7.8       174       126        60
OIR    2025250     91400   19.3400 -113.0200       7.8       174       124        60
OIR    2025250     91400   19.3400 -113.0300       7.8       174       121        60
OIR    2025250     91400   19.3400 -113.0400       7.8       175       121        60
OIR    2025250     91400   19.3400 -113.0500       7.8       175       121        60
OIR    2025250     91400   19.3400 -113.0600       7.8       175       121        60
OIR    2025250     91400   19.3400 -113.0700       7.8       175       121        60
OIR    2025250     91400   19.3400 -113.0800       7.8       175       121        60
OIR    2025250     91400   19.3400 -113.0900       7.8       175       119        60
OIR    2025250     91400   19.3400 -113.1000       7.8       175       116        60
OIR    2025250     91400   19.3400 -113.1100       7.9       175       115        60
OIR    2025250     91400   19.3400 -113.1200       7.9       175       114        60
OIR    2025250     91400   19.3400 -113.1300       7.9       175       113        60
OIR    2025250     91400   19.3400 -113.1400       7.9       175       113        60
OIR    2025250     91400   19.3400 -113.1500       7.9       175       113        60
OIR    2025250     91400   19.3400 -113.1600       7.9       175       113        60
OIR    2025250     91400   19.3400 -113.1700       7.9       175       113        60
OIR    2025250     91400   19.3400 -113.1800       7.9       176       112        60
OIR    2025250     91400   19.3400 -113.1900       7.9       176       112        60
OIR    2025250     91400   19.3400 -113.2000       7.9       176       111        60
OIR    2025250     91400   19.3400 -113.2100       7.9       176       110        60
OIR    2025250     91400   19.3400 -113.2200       7.9       176       109        60
OIR    2025250     91400   19.3400 -113.2300       7.9       175       107        60
OIR    2025250     91400   19.3400 -113.2400       7.9       175       105        60
OIR    2025250     91400   19.3400 -113.2500       7.9       175       104        60
OIR    2025250     91400   19.3400 -113.2600       7.9       175       104        60
OIR    2025250     91400   19.3400 -113.2700       8.0       175       104        60
OIR    2025250     91400   19.3400 -113.2800       8.0       175       104        60
OIR    2025250     91400   19.3400 -113.2900       8.0       175       104        60
OIR    2025250     91400   19.3400 -113.3000       8.0       175       104        60
OIR    2025250     91400   19.3400 -113.3100       8.0       175       104        60
OIR    2025250     91400   19.3400 -113.3200       8.0       175       104        60
OIR    2025250     91400   19.3400 -113.3300       8.0       175       104        60
OIR    2025250     91400   19.3400 -113.3400       8.1       175       103        60
OIR    2025250     91400   19.3400 -113.3500       8.1       175       103        60
OIR    2025250     91400   19.3400 -113.3600       8.1       175       103        60
OIR    2025250     91400   19.3400 -113.3700       8.1       175       103        60
OIR    2025250     91400   19.3400 -113.3800       8.2       175       103        60
OIR    2025250     91400   19.3400 -113.3900       8.2       175       103        60
OIR    2025250     91400   19.3400 -113.4000       8.2       175       103        60
OIR    2025250     91400   19.3400 -113.4100       8.3       175       103        60
OIR    2025250     91400   19.3400 -113.4200       8.3       176       103        60
OIR    2025250     91400   19.3400 -113.4300       8.3       176       103        60
OIR    2025250     91400   19.3400 -113.4400       8.4       176       103        60
OIR    2025250     91400   19.3400 -113.4500       8.4       176       103        60
OIR    2025250     91400   19.3400 -113.4600       8.4       176       103        60
OIR    2025250     91400   19.3400 -113.4700       8.5       176       103        60
OIR    2025250     91400   19.3400 -113.4800       8.5       176       103        60
OIR    2025250     91400   19.3400 -113.4900       8.5       176       103        60
OIR    2025250     91400   19.3400 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.3400 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.3400 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.3400 -113.5300       8.6       176       104        60
OIR    2025250     91400   19.3400 -113.5400       8.7       176       104        60
OIR    2025250     91400   19.3400 -113.5500       8.7       176       104        60
OIR    2025250     91400   19.3400 -113.5600       8.7       177       104        60
OIR    2025250     91400   19.3400 -113.5700       8.8       177       104        60
OIR    2025250     91400   19.3400 -113.5800       8.8       177       104        60
OIR    2025250     91400   19.3400 -113.5900       8.8       177       104        60
OIR    2025250     91400   19.3400 -113.6000       8.9       177       104        60
OIR    2025250     91400   19.3400 -113.6100       8.9       177       104        60
OIR    2025250     91400   19.3400 -113.6200       8.9       177       104        60
OIR    2025250     91400   19.3400 -113.6300       8.9       177       104        60
OIR    2025250     91400   19.3400 -113.6400       9.0       177       104        60
OIR    2025250     91400   19.3400 -113.6500       9.0       178       104        60
OIR    2025250     91400   19.3400 -113.6600       9.0       178       104        60
OIR    2025250     91400   19.3400 -113.6700       9.0       178       104        60
OIR    2025250     91400   19.3400 -113.6800       9.0       178       104        60
OIR    2025250     91400   19.3400 -113.6900       9.0       178       104        60
OIR    2025250     91400   19.3400 -113.7000       9.0       178       104        60
OIR    2025250     91400   19.3400 -113.7100       9.1       178       104        60
OIR    2025250     91400   19.3400 -113.7200       9.1       178       104        60
OIR    2025250     91400   19.3400 -113.7300       9.1       178       104        60
OIR    2025250     91400   19.3400 -113.7400       9.2       179       105        60
OIR    2025250     91400   19.3400 -113.7500       9.2       179       107        60
OIR    2025250     91400   19.3400 -113.7600       9.3       179       107        60
OIR    2025250     91400   19.3400 -113.7700       9.3       179       108        60
OIR    2025250     91400   19.3400 -113.7800       9.3       179       108        60
OIR    2025250     91400   19.3400 -113.7900       9.3       179       108        60
OIR    2025250     91400   19.3400 -113.8000       9.3       180       108        60
OIR    2025250     91400   19.3400 -113.8100       9.3       180       109        60
OIR    2025250     91400   19.3400 -113.8200       9.3       180       109        60
OIR    2025250     91400   19.3400 -113.8300       9.3       180       110        60
OIR    2025250     91400   19.3400 -113.8400       9.4       180       110        60
OIR    2025250     91400   19.3400 -113.8500       9.4       180       110        60
OIR    2025250     91400   19.3400 -113.8600       9.4       180       109        60
OIR    2025250     91400   19.3400 -113.8700       9.4       180       109        60
OIR    2025250     91400   19.3400 -113.8800       9.4       181       110        60
OIR    2025250     91400   19.3400 -113.8900       9.4       181       110        60
OIR    2025250     91400   19.3400 -113.9000       9.4       181       110        60
OIR    2025250     91400   19.3400 -113.9100       9.4       181       110        60
OIR    2025250     91400   19.3400 -113.9200       9.5       181       111        60
OIR    2025250     91400   19.3400 -113.9300       9.5       182       111        60
OIR    2025250     91400   19.3400 -113.9400       9.7       183       111        60
OIR    2025250     91400   19.3400 -113.9500       9.7       183       110        60
OIR    2025250     91400   19.3400 -113.9600       9.8       184       111        60
OIR    2025250     91400   19.3400 -113.9700       9.8       184       111        60
OIR    2025250     91400   19.3400 -113.9800       9.9       184       111        60
OIR    2025250     91400   19.3400 -113.9900       9.9       184       110        60
OIR    2025250     91400   19.3400 -114.0000       9.9       184       109        60
OIR    2025250     91400   19.3400 -114.0100       9.9       184       110        60
OIR    2025250     91400   19.3400 -114.0200       9.9       185       110        60
OIR    2025250     91400   19.3400 -114.0300       9.9       185       110        60
OIR    2025250     91400   19.3400 -114.0400      10.0       185       111        60
OIR    2025250     91400   19.3400 -114.0500      10.0       185       112        60
OIR    2025250     91400   19.3400 -114.0600      10.0       185       113        60
OIR    2025250     91400   19.3400 -114.0700      10.0       185       114        60
OIR    2025250     91400   19.3400 -114.0800      10.0       186       112        60
OIR    2025250     91400   19.3400 -114.0900      10.1       186       111        60
OIR    2025250     91400   19.3400 -114.1000      10.1       186       112        60
OIR    2025250     91400   19.3400 -114.1100      10.1       186       112        60
OIR    2025250     91400   19.3400 -114.1200      10.1       186       113        60
OIR    2025250     91400   19.3400 -114.1300      10.1       187       113        60
OIR    2025250     91400   19.3400 -114.1400      10.2       187       114        60
OIR    2025250     91400   19.3400 -114.1500      10.2       187       114        60
OIR    2025250     91400   19.3400 -114.1600      10.2       187       114        60
OIR    2025250     91400   19.3400 -114.1700      10.2       187       114        60
OIR    2025250     91400   19.3400 -114.1800      10.2       187       114        60
OIR    2025250     91400   19.3400 -114.1900      10.2       188       114        60
OIR    2025250     91400   19.3400 -114.2000      10.2       188       115        60
OIR    2025250     91400   19.3400 -114.2100      10.1       188       115        60
OIR    2025250     91400   19.3400 -114.2200      10.1       188       116        60
OIR    2025250     91400   19.3400 -114.2300      10.1       189       116        60
OIR    2025250     91400   19.3400 -114.2400      10.0       189       115        60
OIR    2025250     91400   19.3400 -114.2500       9.9       190       115        60
OIR    2025250     91400   19.3400 -114.2600       9.8       191       116        60
OIR    2025250     91400   19.3400 -114.2700       9.8       191       116        60
OIR    2025250     91400   19.3400 -114.2800       9.8       191       116        60
OIR    2025250     91400   19.3400 -114.2900       9.8       191       116        60
OIR    2025250     91400   19.3400 -114.3000       9.8       191       117        60
OIR    2025250     91400   19.3400 -114.3100       9.8       191       119        60
OIR    2025250     91400   19.3400 -114.3200       9.8       191       121        60
OIR    2025250     91400   19.3400 -114.3300       9.8       191       123        60
OIR    2025250     91400   19.3400 -114.3400       9.8       191       125        60
OIR    2025250     91400   19.3400 -114.3500       9.8       191       128        60
OIR    2025250     91400   19.3400 -114.3600       9.8       191       131        60
OIR    2025250     91400   19.3400 -114.3700       9.8       191       132        60
OIR    2025250     91400   19.3400 -114.3800       9.8       191       132        60
OIR    2025250     91400   19.3400 -114.3900       9.8       190       132        60
OIR    2025250     91400   19.3400 -114.4000       9.9       190       132        60
OIR    2025250     91400   19.3400 -114.4100       9.9       190       132        60
OIR    2025250     91400   19.3400 -114.4200       9.9       189       131        60
OIR    2025250     91400   19.3400 -114.4300      10.0       189       129        60
OIR    2025250     91400   19.3400 -114.4400      10.0       188       129        60
OIR    2025250     91400   19.3400 -114.4500      10.0       188       129        60
OIR    2025250     91400   19.3400 -114.4600      10.0       188       130        60
OIR    2025250     91400   19.3400 -114.4700      10.0       187       132        60
OIR    2025250     91400   19.3400 -114.4800      10.0       187       133        60
OIR    2025250     91400   19.3400 -114.4900      10.0       187       134        60
OIR    2025250     91400   19.3400 -114.5000       9.9       187       134        60
OIR    2025250     91400   19.3400 -114.5100       9.9       187       133        60
OIR    2025250     91400   19.3400 -114.5200       9.8       186       131        60
OIR    2025250     91400   19.3400 -114.5300       9.8       186       132        60
OIR    2025250     91400   19.3400 -114.5400       9.7       186       135        60
OIR    2025250     91400   19.3400 -114.5500       9.6       186       135        60
OIR    2025250     91400   19.3400 -114.5600       9.6       185       135        60
OIR    2025250     91400   19.3400 -114.5700       9.5       185       135        60
OIR    2025250     91400   19.3400 -114.5800       9.2       184       134        60
OIR    2025250     91400   19.3400 -114.5900       8.6       182       134        60
OIR    2025250     91400   19.3400 -114.6000       7.9       178       137        60
OIR    2025250     91400   19.3400 -114.6100       7.2       172       140        60
OIR    2025250     91400   19.3400 -114.6200       6.9       170       141        60
OIR    2025250     91400   19.3300 -109.4800       4.6        22       133        60
OIR    2025250     91400   19.3300 -109.4900       6.7        26       127        60
OIR    2025250     91400   19.3300 -112.9100       7.9       172       139        60
OIR    2025250     91400   19.3300 -112.9200       7.9       172       137        60
OIR    2025250     91400   19.3300 -112.9300       7.8       173       135        60
OIR    2025250     91400   19.3300 -112.9400       7.8       173       132        60
OIR    2025250     91400   19.3300 -112.9500       7.8       173       133        60
OIR    2025250     91400   19.3300 -112.9600       7.8       173       133        60
OIR    2025250     91400   19.3300 -112.9700       7.8       173       133        60
OIR    2025250     91400   19.3300 -112.9800       7.8       174       132        60
OIR    2025250     91400   19.3300 -112.9900       7.8       174       131        60
OIR    2025250     91400   19.3300 -113.0000       7.8       174       131        60
OIR    2025250     91400   19.3300 -113.0100       7.8       174       131        60
OIR    2025250     91400   19.3300 -113.0200       7.8       174       127        60
OIR    2025250     91400   19.3300 -113.0300       7.8       174       122        60
OIR    2025250     91400   19.3300 -113.0400       7.8       175       121        60
OIR    2025250     91400   19.3300 -113.0500       7.8       175       121        60
OIR    2025250     91400   19.3300 -113.0600       7.8       175       121        60
OIR    2025250     91400   19.3300 -113.0700       7.8       175       121        60
OIR    2025250     91400   19.3300 -113.0800       7.8       175       121        60
OIR    2025250     91400   19.3300 -113.0900       7.8       175       119        60
OIR    2025250     91400   19.3300 -113.1000       7.9       175       117        60
OIR    2025250     91400   19.3300 -113.1100       7.9       175       116        60
OIR    2025250     91400   19.3300 -113.1200       7.9       175       116        60
OIR    2025250     91400   19.3300 -113.1300       7.9       175       115        60
OIR    2025250     91400   19.3300 -113.1400       7.9       175       115        60
OIR    2025250     91400   19.3300 -113.1500       7.9       175       115        60
OIR    2025250     91400   19.3300 -113.1600       7.9       175       114        60
OIR    2025250     91400   19.3300 -113.1700       7.9       175       113        60
OIR    2025250     91400   19.3300 -113.1800       7.9       176       113        60
OIR    2025250     91400   19.3300 -113.1900       7.9       176       112        60
OIR    2025250     91400   19.3300 -113.2000       7.9       176       112        60
OIR    2025250     91400   19.3300 -113.2100       7.9       176       110        60
OIR    2025250     91400   19.3300 -113.2200       7.9       175       109        60
OIR    2025250     91400   19.3300 -113.2300       7.9       175       108        60
OIR    2025250     91400   19.3300 -113.2400       7.9       175       105        60
OIR    2025250     91400   19.3300 -113.2500       7.9       175       105        60
OIR    2025250     91400   19.3300 -113.2600       8.0       175       104        60
OIR    2025250     91400   19.3300 -113.2700       8.0       175       104        60
OIR    2025250     91400   19.3300 -113.2800       8.0       175       104        60
OIR    2025250     91400   19.3300 -113.2900       8.0       175       104        60
OIR    2025250     91400   19.3300 -113.3000       8.0       175       104        60
OIR    2025250     91400   19.3300 -113.3100       8.0       175       105        60
OIR    2025250     91400   19.3300 -113.3200       8.0       175       104        60
OIR    2025250     91400   19.3300 -113.3300       8.0       175       104        60
OIR    2025250     91400   19.3300 -113.3400       8.1       175       103        60
OIR    2025250     91400   19.3300 -113.3500       8.1       175       103        60
OIR    2025250     91400   19.3300 -113.3600       8.1       175       103        60
OIR    2025250     91400   19.3300 -113.3700       8.2       175       103        60
OIR    2025250     91400   19.3300 -113.3800       8.2       175       103        60
OIR    2025250     91400   19.3300 -113.3900       8.2       175       103        60
OIR    2025250     91400   19.3300 -113.4000       8.2       175       103        60
OIR    2025250     91400   19.3300 -113.4100       8.3       175       103        60
OIR    2025250     91400   19.3300 -113.4200       8.3       176       103        60
OIR    2025250     91400   19.3300 -113.4300       8.3       176       103        60
OIR    2025250     91400   19.3300 -113.4400       8.4       176       103        60
OIR    2025250     91400   19.3300 -113.4500       8.4       176       103        60
OIR    2025250     91400   19.3300 -113.4600       8.4       176       103        60
OIR    2025250     91400   19.3300 -113.4700       8.5       176       103        60
OIR    2025250     91400   19.3300 -113.4800       8.5       176       103        60
OIR    2025250     91400   19.3300 -113.4900       8.5       176       104        60
OIR    2025250     91400   19.3300 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.3300 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.3300 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.3300 -113.5300       8.6       176       104        60
OIR    2025250     91400   19.3300 -113.5400       8.7       176       104        60
OIR    2025250     91400   19.3300 -113.5500       8.7       177       104        60
OIR    2025250     91400   19.3300 -113.5600       8.7       177       104        60
OIR    2025250     91400   19.3300 -113.5700       8.8       177       104        60
OIR    2025250     91400   19.3300 -113.5800       8.8       177       104        60
OIR    2025250     91400   19.3300 -113.5900       8.9       177       104        60
OIR    2025250     91400   19.3300 -113.6000       8.9       177       104        60
OIR    2025250     91400   19.3300 -113.6100       8.9       177       104        60
OIR    2025250     91400   19.3300 -113.6200       8.9       177       104        60
OIR    2025250     91400   19.3300 -113.6300       8.9       177       104        60
OIR    2025250     91400   19.3300 -113.6400       9.0       177       104        60
OIR    2025250     91400   19.3300 -113.6500       9.0       178       105        60
OIR    2025250     91400   19.3300 -113.6600       9.0       178       105        60
OIR    2025250     91400   19.3300 -113.6700       9.0       178       105        60
OIR    2025250     91400   19.3300 -113.6800       9.0       178       105        60
OIR    2025250     91400   19.3300 -113.6900       9.0       178       105        60
OIR    2025250     91400   19.3300 -113.7000       9.0       178       105        60
OIR    2025250     91400   19.3300 -113.7100       9.1       178       105        60
OIR    2025250     91400   19.3300 -113.7200       9.1       178       104        60
OIR    2025250     91400   19.3300 -113.7300       9.2       179       105        60
OIR    2025250     91400   19.3300 -113.7400       9.2       179       107        60
OIR    2025250     91400   19.3300 -113.7500       9.2       179       107        60
OIR    2025250     91400   19.3300 -113.7600       9.3       179       108        60
OIR    2025250     91400   19.3300 -113.7700       9.3       179       108        60
OIR    2025250     91400   19.3300 -113.7800       9.3       179       108        60
OIR    2025250     91400   19.3300 -113.7900       9.3       180       107        60
OIR    2025250     91400   19.3300 -113.8000       9.3       180       107        60
OIR    2025250     91400   19.3300 -113.8100       9.3       180       108        60
OIR    2025250     91400   19.3300 -113.8200       9.3       180       109        60
OIR    2025250     91400   19.3300 -113.8300       9.4       180       109        60
OIR    2025250     91400   19.3300 -113.8400       9.4       180       110        60
OIR    2025250     91400   19.3300 -113.8500       9.4       180       109        60
OIR    2025250     91400   19.3300 -113.8600       9.4       180       108        60
OIR    2025250     91400   19.3300 -113.8700       9.4       181       109        60
OIR    2025250     91400   19.3300 -113.8800       9.4       181       109        60
OIR    2025250     91400   19.3300 -113.8900       9.4       181       110        60
OIR    2025250     91400   19.3300 -113.9000       9.4       181       109        60
OIR    2025250     91400   19.3300 -113.9100       9.5       181       109        60
OIR    2025250     91400   19.3300 -113.9200       9.5       181       111        60
OIR    2025250     91400   19.3300 -113.9300       9.6       182       112        60
OIR    2025250     91400   19.3300 -113.9400       9.7       183       112        60
OIR    2025250     91400   19.3300 -113.9500       9.8       183       112        60
OIR    2025250     91400   19.3300 -113.9600       9.9       184       111        60
OIR    2025250     91400   19.3300 -113.9700       9.9       184       111        60
OIR    2025250     91400   19.3300 -113.9800       9.9       184       110        60
OIR    2025250     91400   19.3300 -113.9900       9.9       184       109        60
OIR    2025250     91400   19.3300 -114.0000       9.9       184       109        60
OIR    2025250     91400   19.3300 -114.0100       9.9       185       109        60
OIR    2025250     91400   19.3300 -114.0200      10.0       185       109        60
OIR    2025250     91400   19.3300 -114.0300      10.0       185       110        60
OIR    2025250     91400   19.3300 -114.0400      10.0       185       111        60
OIR    2025250     91400   19.3300 -114.0500      10.0       185       111        60
OIR    2025250     91400   19.3300 -114.0600      10.1       185       113        60
OIR    2025250     91400   19.3300 -114.0700      10.1       186       114        60
OIR    2025250     91400   19.3300 -114.0800      10.1       186       113        60
OIR    2025250     91400   19.3300 -114.0900      10.1       186       112        60
OIR    2025250     91400   19.3300 -114.1000      10.1       186       112        60
OIR    2025250     91400   19.3300 -114.1100      10.2       186       113        60
OIR    2025250     91400   19.3300 -114.1200      10.2       186       113        60
OIR    2025250     91400   19.3300 -114.1300      10.2       187       113        60
OIR    2025250     91400   19.3300 -114.1400      10.2       187       113        60
OIR    2025250     91400   19.3300 -114.1500      10.2       187       113        60
OIR    2025250     91400   19.3300 -114.1600      10.2       187       114        60
OIR    2025250     91400   19.3300 -114.1700      10.2       187       113        60
OIR    2025250     91400   19.3300 -114.1800      10.2       187       113        60
OIR    2025250     91400   19.3300 -114.1900      10.2       188       113        60
OIR    2025250     91400   19.3300 -114.2000      10.2       188       114        60
OIR    2025250     91400   19.3300 -114.2100      10.2       188       115        60
OIR    2025250     91400   19.3300 -114.2200      10.2       188       116        60
OIR    2025250     91400   19.3300 -114.2300      10.1       189       116        60
OIR    2025250     91400   19.3300 -114.2400      10.1       189       116        60
OIR    2025250     91400   19.3300 -114.2500       9.9       190       116        60
OIR    2025250     91400   19.3300 -114.2600       9.9       191       116        60
OIR    2025250     91400   19.3300 -114.2700       9.8       191       116        60
OIR    2025250     91400   19.3300 -114.2800       9.8       191       116        60
OIR    2025250     91400   19.3300 -114.2900       9.8       191       119        60
OIR    2025250     91400   19.3300 -114.3000       9.8       191       121        60
OIR    2025250     91400   19.3300 -114.3100       9.8       191       122        60
OIR    2025250     91400   19.3300 -114.3200       9.8       191       124        60
OIR    2025250     91400   19.3300 -114.3300       9.8       191       126        60
OIR    2025250     91400   19.3300 -114.3400       9.8       191       127        60
OIR    2025250     91400   19.3300 -114.3500       9.8       191       128        60
OIR    2025250     91400   19.3300 -114.3600       9.8       191       129        60
OIR    2025250     91400   19.3300 -114.3700       9.8       191       130        60
OIR    2025250     91400   19.3300 -114.3800       9.8       190       131        60
OIR    2025250     91400   19.3300 -114.3900       9.9       190       131        60
OIR    2025250     91400   19.3300 -114.4000       9.9       190       132        60
OIR    2025250     91400   19.3300 -114.4100      10.0       189       132        60
OIR    2025250     91400   19.3300 -114.4200      10.0       189       131        60
OIR    2025250     91400   19.3300 -114.4300      10.1       188       129        60
OIR    2025250     91400   19.3300 -114.4400      10.1       188       129        60
OIR    2025250     91400   19.3300 -114.4500      10.1       188       129        60
OIR    2025250     91400   19.3300 -114.4600      10.1       188       130        60
OIR    2025250     91400   19.3300 -114.4700      10.1       187       131        60
OIR    2025250     91400   19.3300 -114.4800      10.1       187       132        60
OIR    2025250     91400   19.3300 -114.4900      10.0       187       133        60
OIR    2025250     91400   19.3300 -114.5000      10.0       187       133        60
OIR    2025250     91400   19.3300 -114.5100      10.0       187       132        60
OIR    2025250     91400   19.3300 -114.5200       9.9       186       130        60
OIR    2025250     91400   19.3300 -114.5300       9.9       186       131        60
OIR    2025250     91400   19.3300 -114.5400       9.8       186       135        60
OIR    2025250     91400   19.3300 -114.5500       9.8       186       138        60
OIR    2025250     91400   19.3300 -114.5600       9.7       185       136        60
OIR    2025250     91400   19.3300 -114.5700       9.6       185       134        60
OIR    2025250     91400   19.3300 -114.5800       9.4       184       133        60
OIR    2025250     91400   19.3300 -114.5900       8.9       183       132        60
OIR    2025250     91400   19.3300 -114.6000       8.2       179       135        60
OIR    2025250     91400   19.3300 -114.6100       7.4       174       139        60
OIR    2025250     91400   19.3200 -110.9400       4.9        55       141        60
OIR    2025250     91400   19.3200 -112.9100       7.9       172       140        60
OIR    2025250     91400   19.3200 -112.9200       7.9       172       133        60
OIR    2025250     91400   19.3200 -112.9300       7.9       173       132        60
OIR    2025250     91400   19.3200 -112.9400       7.8       173       132        60
OIR    2025250     91400   19.3200 -112.9500       7.8       173       133        60
OIR    2025250     91400   19.3200 -112.9600       7.8       173       133        60
OIR    2025250     91400   19.3200 -112.9700       7.8       173       133        60
OIR    2025250     91400   19.3200 -112.9800       7.8       173       132        60
OIR    2025250     91400   19.3200 -112.9900       7.8       174       131        60
OIR    2025250     91400   19.3200 -113.0000       7.8       174       133        60
OIR    2025250     91400   19.3200 -113.0100       7.8       174       136        60
OIR    2025250     91400   19.3200 -113.0200       7.8       174       132        60
OIR    2025250     91400   19.3200 -113.0300       7.8       174       125        60
OIR    2025250     91400   19.3200 -113.0400       7.8       175       121        60
OIR    2025250     91400   19.3200 -113.0500       7.8       175       120        60
OIR    2025250     91400   19.3200 -113.0600       7.8       175       120        60
OIR    2025250     91400   19.3200 -113.0700       7.8       175       119        60
OIR    2025250     91400   19.3200 -113.0800       7.8       175       119        60
OIR    2025250     91400   19.3200 -113.0900       7.8       175       119        60
OIR    2025250     91400   19.3200 -113.1000       7.9       175       117        60
OIR    2025250     91400   19.3200 -113.1100       7.9       175       117        60
OIR    2025250     91400   19.3200 -113.1200       7.9       175       117        60
OIR    2025250     91400   19.3200 -113.1300       7.9       175       116        60
OIR    2025250     91400   19.3200 -113.1400       7.9       175       116        60
OIR    2025250     91400   19.3200 -113.1500       7.9       175       117        60
OIR    2025250     91400   19.3200 -113.1600       7.9       175       115        60
OIR    2025250     91400   19.3200 -113.1700       7.9       176       113        60
OIR    2025250     91400   19.3200 -113.1800       7.9       176       112        60
OIR    2025250     91400   19.3200 -113.1900       7.9       176       112        60
OIR    2025250     91400   19.3200 -113.2000       7.9       176       112        60
OIR    2025250     91400   19.3200 -113.2100       7.9       176       110        60
OIR    2025250     91400   19.3200 -113.2200       7.9       175       109        60
OIR    2025250     91400   19.3200 -113.2300       7.9       175       108        60
OIR    2025250     91400   19.3200 -113.2400       7.9       175       107        60
OIR    2025250     91400   19.3200 -113.2500       7.9       175       105        60
OIR    2025250     91400   19.3200 -113.2600       8.0       175       104        60
OIR    2025250     91400   19.3200 -113.2700       8.0       175       104        60
OIR    2025250     91400   19.3200 -113.2800       8.0       175       104        60
OIR    2025250     91400   19.3200 -113.2900       8.0       175       104        60
OIR    2025250     91400   19.3200 -113.3000       8.0       175       104        60
OIR    2025250     91400   19.3200 -113.3100       8.0       175       104        60
OIR    2025250     91400   19.3200 -113.3200       8.0       175       104        60
OIR    2025250     91400   19.3200 -113.3300       8.1       175       104        60
OIR    2025250     91400   19.3200 -113.3400       8.1       175       103        60
OIR    2025250     91400   19.3200 -113.3500       8.1       175       103        60
OIR    2025250     91400   19.3200 -113.3600       8.1       175       103        60
OIR    2025250     91400   19.3200 -113.3700       8.2       175       103        60
OIR    2025250     91400   19.3200 -113.3800       8.2       175       103        60
OIR    2025250     91400   19.3200 -113.3900       8.2       175       103        60
OIR    2025250     91400   19.3200 -113.4000       8.3       175       103        60
OIR    2025250     91400   19.3200 -113.4100       8.3       176       103        60
OIR    2025250     91400   19.3200 -113.4200       8.3       176       103        60
OIR    2025250     91400   19.3200 -113.4300       8.3       176       103        60
OIR    2025250     91400   19.3200 -113.4400       8.4       176       103        60
OIR    2025250     91400   19.3200 -113.4500       8.4       176       103        60
OIR    2025250     91400   19.3200 -113.4600       8.5       176       103        60
OIR    2025250     91400   19.3200 -113.4700       8.5       176       103        60
OIR    2025250     91400   19.3200 -113.4800       8.5       176       103        60
OIR    2025250     91400   19.3200 -113.4900       8.5       176       104        60
OIR    2025250     91400   19.3200 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.3200 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.3200 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.3200 -113.5300       8.6       176       104        60
OIR    2025250     91400   19.3200 -113.5400       8.7       176       104        60
OIR    2025250     91400   19.3200 -113.5500       8.7       177       104        60
OIR    2025250     91400   19.3200 -113.5600       8.8       177       105        60
OIR    2025250     91400   19.3200 -113.5700       8.8       177       105        60
OIR    2025250     91400   19.3200 -113.5800       8.8       177       105        60
OIR    2025250     91400   19.3200 -113.5900       8.9       177       104        60
OIR    2025250     91400   19.3200 -113.6000       8.9       177       104        60
OIR    2025250     91400   19.3200 -113.6100       8.9       177       105        60
OIR    2025250     91400   19.3200 -113.6200       8.9       177       104        60
OIR    2025250     91400   19.3200 -113.6300       9.0       177       104        60
OIR    2025250     91400   19.3200 -113.6400       9.0       178       105        60
OIR    2025250     91400   19.3200 -113.6500       9.0       178       107        60
OIR    2025250     91400   19.3200 -113.6600       9.0       178       108        60
OIR    2025250     91400   19.3200 -113.6700       9.0       178       107        60
OIR    2025250     91400   19.3200 -113.6800       9.0       178       105        60
OIR    2025250     91400   19.3200 -113.6900       9.0       178       105        60
OIR    2025250     91400   19.3200 -113.7000       9.1       178       105        60
OIR    2025250     91400   19.3200 -113.7100       9.1       178       105        60
OIR    2025250     91400   19.3200 -113.7200       9.1       179       105        60
OIR    2025250     91400   19.3200 -113.7300       9.2       179       105        60
OIR    2025250     91400   19.3200 -113.7400       9.2       179       107        60
OIR    2025250     91400   19.3200 -113.7500       9.3       179       108        60
OIR    2025250     91400   19.3200 -113.7600       9.3       179       108        60
OIR    2025250     91400   19.3200 -113.7700       9.3       179       108        60
OIR    2025250     91400   19.3200 -113.7800       9.3       179       108        60
OIR    2025250     91400   19.3200 -113.7900       9.3       180       107        60
OIR    2025250     91400   19.3200 -113.8000       9.3       180       107        60
OIR    2025250     91400   19.3200 -113.8100       9.4       180       108        60
OIR    2025250     91400   19.3200 -113.8200       9.4       180       108        60
OIR    2025250     91400   19.3200 -113.8300       9.4       180       109        60
OIR    2025250     91400   19.3200 -113.8400       9.4       180       109        60
OIR    2025250     91400   19.3200 -113.8500       9.4       180       109        60
OIR    2025250     91400   19.3200 -113.8600       9.4       180       109        60
OIR    2025250     91400   19.3200 -113.8700       9.4       181       109        60
OIR    2025250     91400   19.3200 -113.8800       9.4       181       110        60
OIR    2025250     91400   19.3200 -113.8900       9.4       181       111        60
OIR    2025250     91400   19.3200 -113.9000       9.4       181       111        60
OIR    2025250     91400   19.3200 -113.9100       9.5       181       110        60
OIR    2025250     91400   19.3200 -113.9200       9.6       182       111        60
OIR    2025250     91400   19.3200 -113.9300       9.7       182       112        60
OIR    2025250     91400   19.3200 -113.9400       9.8       183       112        60
OIR    2025250     91400   19.3200 -113.9500       9.9       183       111        60
OIR    2025250     91400   19.3200 -113.9600       9.9       184       111        60
OIR    2025250     91400   19.3200 -113.9700       9.9       184       111        60
OIR    2025250     91400   19.3200 -113.9800       9.9       184       111        60
OIR    2025250     91400   19.3200 -113.9900       9.9       184       111        60
OIR    2025250     91400   19.3200 -114.0000      10.0       184       110        60
OIR    2025250     91400   19.3200 -114.0100      10.0       185       110        60
OIR    2025250     91400   19.3200 -114.0200      10.0       185       110        60
OIR    2025250     91400   19.3200 -114.0300      10.0       185       110        60
OIR    2025250     91400   19.3200 -114.0400      10.1       185       111        60
OIR    2025250     91400   19.3200 -114.0500      10.1       185       111        60
OIR    2025250     91400   19.3200 -114.0600      10.1       185       113        60
OIR    2025250     91400   19.3200 -114.0700      10.1       186       115        60
OIR    2025250     91400   19.3200 -114.0800      10.1       186       114        60
OIR    2025250     91400   19.3200 -114.0900      10.2       186       114        60
OIR    2025250     91400   19.3200 -114.1000      10.2       186       114        60
OIR    2025250     91400   19.3200 -114.1100      10.2       186       114        60
OIR    2025250     91400   19.3200 -114.1200      10.2       186       114        60
OIR    2025250     91400   19.3200 -114.1300      10.2       187       114        60
OIR    2025250     91400   19.3200 -114.1400      10.3       187       113        60
OIR    2025250     91400   19.3200 -114.1500      10.3       187       114        60
OIR    2025250     91400   19.3200 -114.1600      10.3       187       114        60
OIR    2025250     91400   19.3200 -114.1700      10.3       187       113        60
OIR    2025250     91400   19.3200 -114.1800      10.3       187       113        60
OIR    2025250     91400   19.3200 -114.1900      10.3       187       113        60
OIR    2025250     91400   19.3200 -114.2000      10.3       188       114        60
OIR    2025250     91400   19.3200 -114.2100      10.3       188       116        60
OIR    2025250     91400   19.3200 -114.2200      10.2       188       116        60
OIR    2025250     91400   19.3200 -114.2300      10.2       188       116        60
OIR    2025250     91400   19.3200 -114.2400      10.2       189       116        60
OIR    2025250     91400   19.3200 -114.2500      10.1       189       116        60
OIR    2025250     91400   19.3200 -114.2600       9.9       190       116        60
OIR    2025250     91400   19.3200 -114.2700       9.9       191       116        60
OIR    2025250     91400   19.3200 -114.2800       9.8       191       116        60
OIR    2025250     91400   19.3200 -114.2900       9.8       191       120        60
OIR    2025250     91400   19.3200 -114.3000       9.8       191       123        60
OIR    2025250     91400   19.3200 -114.3100       9.8       191       125        60
OIR    2025250     91400   19.3200 -114.3200       9.8       191       127        60
OIR    2025250     91400   19.3200 -114.3300       9.8       191       129        60
OIR    2025250     91400   19.3200 -114.3400       9.8       191       131        60
OIR    2025250     91400   19.3200 -114.3500       9.8       191       130        60
OIR    2025250     91400   19.3200 -114.3600       9.8       191       127        60
OIR    2025250     91400   19.3200 -114.3700       9.9       190       127        60
OIR    2025250     91400   19.3200 -114.3800       9.9       190       128        60
OIR    2025250     91400   19.3200 -114.3900      10.0       189       130        60
OIR    2025250     91400   19.3200 -114.4000      10.0       189       130        60
OIR    2025250     91400   19.3200 -114.4100      10.1       189       131        60
OIR    2025250     91400   19.3200 -114.4200      10.1       189       130        60
OIR    2025250     91400   19.3200 -114.4300      10.1       188       127        60
OIR    2025250     91400   19.3200 -114.4400      10.2       188       126        60
OIR    2025250     91400   19.3200 -114.4500      10.2       188       128        60
OIR    2025250     91400   19.3200 -114.4600      10.2       187       129        60
OIR    2025250     91400   19.3200 -114.4700      10.1       187       131        60
OIR    2025250     91400   19.3200 -114.4800      10.1       187       133        60
OIR    2025250     91400   19.3200 -114.4900      10.1       187       132        60
OIR    2025250     91400   19.3200 -114.5000      10.1       187       131        60
OIR    2025250     91400   19.3200 -114.5100      10.1       187       131        60
OIR    2025250     91400   19.3200 -114.5200      10.1       186       131        60
OIR    2025250     91400   19.3200 -114.5300      10.0       186       131        60
OIR    2025250     91400   19.3200 -114.5400      10.0       186       132        60
OIR    2025250     91400   19.3200 -114.5500       9.9       186       134        60
OIR    2025250     91400   19.3200 -114.5600       9.8       185       135        60
OIR    2025250     91400   19.3200 -114.5700       9.7       185       136        60
OIR    2025250     91400   19.3200 -114.5800       9.5       185       137        60
OIR    2025250     91400   19.3200 -114.5900       9.1       183       138        60
OIR    2025250     91400   19.3200 -114.6000       8.5       180       139        60
OIR    2025250     91400   19.3200 -114.6100       7.7       175       140        60
OIR    2025250     91400   19.3100 -110.9500       5.7        48       138        60
OIR    2025250     91400   19.3100 -112.9100       7.9       172       140        60
OIR    2025250     91400   19.3100 -112.9200       7.9       172       136        60
OIR    2025250     91400   19.3100 -112.9300       7.9       173       134        60
OIR    2025250     91400   19.3100 -112.9400       7.9       173       133        60
OIR    2025250     91400   19.3100 -112.9500       7.8       173       134        60
OIR    2025250     91400   19.3100 -112.9600       7.8       173       136        60
OIR    2025250     91400   19.3100 -112.9700       7.8       173       136        60
OIR    2025250     91400   19.3100 -112.9800       7.8       173       133        60
OIR    2025250     91400   19.3100 -112.9900       7.8       174       129        60
OIR    2025250     91400   19.3100 -113.0000       7.8       174       130        60
OIR    2025250     91400   19.3100 -113.0100       7.8       174       133        60
OIR    2025250     91400   19.3100 -113.0200       7.8       174       132        60
OIR    2025250     91400   19.3100 -113.0300       7.8       174       127        60
OIR    2025250     91400   19.3100 -113.0400       7.8       175       123        60
OIR    2025250     91400   19.3100 -113.0500       7.8       175       123        60
OIR    2025250     91400   19.3100 -113.0600       7.8       175       123        60
OIR    2025250     91400   19.3100 -113.0700       7.8       175       121        60
OIR    2025250     91400   19.3100 -113.0800       7.8       175       120        60
OIR    2025250     91400   19.3100 -113.0900       7.9       175       119        60
OIR    2025250     91400   19.3100 -113.1000       7.9       175       119        60
OIR    2025250     91400   19.3100 -113.1100       7.9       175       120        60
OIR    2025250     91400   19.3100 -113.1200       7.9       175       119        60
OIR    2025250     91400   19.3100 -113.1300       7.9       175       117        60
OIR    2025250     91400   19.3100 -113.1400       7.9       175       117        60
OIR    2025250     91400   19.3100 -113.1500       7.9       175       119        60
OIR    2025250     91400   19.3100 -113.1600       7.9       176       116        60
OIR    2025250     91400   19.3100 -113.1700       7.9       176       114        60
OIR    2025250     91400   19.3100 -113.1800       7.9       176       111        60
OIR    2025250     91400   19.3100 -113.1900       7.9       176       112        60
OIR    2025250     91400   19.3100 -113.2000       7.9       176       112        60
OIR    2025250     91400   19.3100 -113.2100       7.9       176       111        60
OIR    2025250     91400   19.3100 -113.2200       7.9       176       109        60
OIR    2025250     91400   19.3100 -113.2300       7.9       175       108        60
OIR    2025250     91400   19.3100 -113.2400       7.9       175       108        60
OIR    2025250     91400   19.3100 -113.2500       7.9       175       107        60
OIR    2025250     91400   19.3100 -113.2600       8.0       175       104        60
OIR    2025250     91400   19.3100 -113.2700       8.0       175       103        60
OIR    2025250     91400   19.3100 -113.2800       8.0       175       103        60
OIR    2025250     91400   19.3100 -113.2900       8.0       175       103        60
OIR    2025250     91400   19.3100 -113.3000       8.0       175       103        60
OIR    2025250     91400   19.3100 -113.3100       8.0       175       103        60
OIR    2025250     91400   19.3100 -113.3200       8.0       175       104        60
OIR    2025250     91400   19.3100 -113.3300       8.1       175       103        60
OIR    2025250     91400   19.3100 -113.3400       8.1       175       103        60
OIR    2025250     91400   19.3100 -113.3500       8.1       175       104        60
OIR    2025250     91400   19.3100 -113.3600       8.1       176       104        60
OIR    2025250     91400   19.3100 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.3100 -113.3800       8.2       176       103        60
OIR    2025250     91400   19.3100 -113.3900       8.2       176       103        60
OIR    2025250     91400   19.3100 -113.4000       8.3       176       103        60
OIR    2025250     91400   19.3100 -113.4100       8.3       176       103        60
OIR    2025250     91400   19.3100 -113.4200       8.3       176       103        60
OIR    2025250     91400   19.3100 -113.4300       8.4       176       103        60
OIR    2025250     91400   19.3100 -113.4400       8.4       176       103        60
OIR    2025250     91400   19.3100 -113.4500       8.4       176       103        60
OIR    2025250     91400   19.3100 -113.4600       8.5       176       103        60
OIR    2025250     91400   19.3100 -113.4700       8.5       176       103        60
OIR    2025250     91400   19.3100 -113.4800       8.5       176       103        60
OIR    2025250     91400   19.3100 -113.4900       8.6       176       103        60
OIR    2025250     91400   19.3100 -113.5000       8.6       176       103        60
OIR    2025250     91400   19.3100 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.3100 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.3100 -113.5300       8.6       176       104        60
OIR    2025250     91400   19.3100 -113.5400       8.7       176       105        60
OIR    2025250     91400   19.3100 -113.5500       8.7       177       105        60
OIR    2025250     91400   19.3100 -113.5600       8.8       177       105        60
OIR    2025250     91400   19.3100 -113.5700       8.8       177       105        60
OIR    2025250     91400   19.3100 -113.5800       8.8       177       105        60
OIR    2025250     91400   19.3100 -113.5900       8.9       177       105        60
OIR    2025250     91400   19.3100 -113.6000       8.9       177       105        60
OIR    2025250     91400   19.3100 -113.6100       8.9       177       105        60
OIR    2025250     91400   19.3100 -113.6200       8.9       177       105        60
OIR    2025250     91400   19.3100 -113.6300       9.0       177       105        60
OIR    2025250     91400   19.3100 -113.6400       9.0       178       105        60
OIR    2025250     91400   19.3100 -113.6500       9.0       178       107        60
OIR    2025250     91400   19.3100 -113.6600       9.0       178       108        60
OIR    2025250     91400   19.3100 -113.6700       9.0       178       108        60
OIR    2025250     91400   19.3100 -113.6800       9.0       178       107        60
OIR    2025250     91400   19.3100 -113.6900       9.1       178       107        60
OIR    2025250     91400   19.3100 -113.7000       9.1       178       107        60
OIR    2025250     91400   19.3100 -113.7100       9.1       178       107        60
OIR    2025250     91400   19.3100 -113.7200       9.2       179       107        60
OIR    2025250     91400   19.3100 -113.7300       9.2       179       107        60
OIR    2025250     91400   19.3100 -113.7400       9.3       179       107        60
OIR    2025250     91400   19.3100 -113.7500       9.3       179       108        60
OIR    2025250     91400   19.3100 -113.7600       9.3       179       108        60
OIR    2025250     91400   19.3100 -113.7700       9.3       179       108        60
OIR    2025250     91400   19.3100 -113.7800       9.3       180       108        60
OIR    2025250     91400   19.3100 -113.7900       9.3       180       107        60
OIR    2025250     91400   19.3100 -113.8000       9.4       180       107        60
OIR    2025250     91400   19.3100 -113.8100       9.4       180       107        60
OIR    2025250     91400   19.3100 -113.8200       9.4       180       108        60
OIR    2025250     91400   19.3100 -113.8300       9.4       180       108        60
OIR    2025250     91400   19.3100 -113.8400       9.4       180       108        60
OIR    2025250     91400   19.3100 -113.8500       9.4       180       108        60
OIR    2025250     91400   19.3100 -113.8600       9.4       180       109        60
OIR    2025250     91400   19.3100 -113.8700       9.4       181       110        60
OIR    2025250     91400   19.3100 -113.8800       9.4       181       111        60
OIR    2025250     91400   19.3100 -113.8900       9.5       181       112        60
OIR    2025250     91400   19.3100 -113.9000       9.5       181       112        60
OIR    2025250     91400   19.3100 -113.9100       9.5       181       111        60
OIR    2025250     91400   19.3100 -113.9200       9.7       182       111        60
OIR    2025250     91400   19.3100 -113.9300       9.8       183       112        60
OIR    2025250     91400   19.3100 -113.9400       9.8       183       112        60
OIR    2025250     91400   19.3100 -113.9500       9.9       184       111        60
OIR    2025250     91400   19.3100 -113.9600       9.9       184       111        60
OIR    2025250     91400   19.3100 -113.9700       9.9       184       112        60
OIR    2025250     91400   19.3100 -113.9800      10.0       184       113        60
OIR    2025250     91400   19.3100 -113.9900      10.0       184       112        60
OIR    2025250     91400   19.3100 -114.0000      10.0       185       111        60
OIR    2025250     91400   19.3100 -114.0100      10.0       185       111        60
OIR    2025250     91400   19.3100 -114.0200      10.1       185       110        60
OIR    2025250     91400   19.3100 -114.0300      10.1       185       110        60
OIR    2025250     91400   19.3100 -114.0400      10.1       185       111        60
OIR    2025250     91400   19.3100 -114.0500      10.1       185       112        60
OIR    2025250     91400   19.3100 -114.0600      10.1       186       114        60
OIR    2025250     91400   19.3100 -114.0700      10.2       186       116        60
OIR    2025250     91400   19.3100 -114.0800      10.2       186       116        60
OIR    2025250     91400   19.3100 -114.0900      10.2       186       116        60
OIR    2025250     91400   19.3100 -114.1000      10.2       186       116        60
OIR    2025250     91400   19.3100 -114.1100      10.3       186       116        60
OIR    2025250     91400   19.3100 -114.1200      10.3       186       116        60
OIR    2025250     91400   19.3100 -114.1300      10.3       187       116        60
OIR    2025250     91400   19.3100 -114.1400      10.3       187       116        60
OIR    2025250     91400   19.3100 -114.1500      10.3       187       116        60
OIR    2025250     91400   19.3100 -114.1600      10.3       187       116        60
OIR    2025250     91400   19.3100 -114.1700      10.3       187       116        60
OIR    2025250     91400   19.3100 -114.1800      10.3       187       116        60
OIR    2025250     91400   19.3100 -114.1900      10.3       187       116        60
OIR    2025250     91400   19.3100 -114.2000      10.3       187       116        60
OIR    2025250     91400   19.3100 -114.2100      10.3       188       116        60
OIR    2025250     91400   19.3100 -114.2200      10.3       188       116        60
OIR    2025250     91400   19.3100 -114.2300      10.3       188       117        60
OIR    2025250     91400   19.3100 -114.2400      10.3       188       117        60
OIR    2025250     91400   19.3100 -114.2500      10.2       189       117        60
OIR    2025250     91400   19.3100 -114.2600      10.1       190       119        60
OIR    2025250     91400   19.3100 -114.2700       9.9       190       119        60
OIR    2025250     91400   19.3100 -114.2800       9.9       191       120        60
OIR    2025250     91400   19.3100 -114.2900       9.8       191       122        60
OIR    2025250     91400   19.3100 -114.3000       9.8       191       124        60
OIR    2025250     91400   19.3100 -114.3100       9.8       191       126        60
OIR    2025250     91400   19.3100 -114.3200       9.8       191       128        60
OIR    2025250     91400   19.3100 -114.3300       9.8       191       129        60
OIR    2025250     91400   19.3100 -114.3400       9.8       191       130        60
OIR    2025250     91400   19.3100 -114.3500       9.8       190       130        60
OIR    2025250     91400   19.3100 -114.3600       9.9       190       129        60
OIR    2025250     91400   19.3100 -114.3700       9.9       190       129        60
OIR    2025250     91400   19.3100 -114.3800      10.0       189       129        60
OIR    2025250     91400   19.3100 -114.3900      10.0       189       129        60
OIR    2025250     91400   19.3100 -114.4000      10.1       189       131        60
OIR    2025250     91400   19.3100 -114.4100      10.1       189       132        60
OIR    2025250     91400   19.3100 -114.4200      10.2       188       132        60
OIR    2025250     91400   19.3100 -114.4300      10.2       188       129        60
OIR    2025250     91400   19.3100 -114.4400      10.2       188       127        60
OIR    2025250     91400   19.3100 -114.4500      10.2       188       129        60
OIR    2025250     91400   19.3100 -114.4600      10.2       187       131        60
OIR    2025250     91400   19.3100 -114.4700      10.2       187       132        60
OIR    2025250     91400   19.3100 -114.4800      10.2       187       133        60
OIR    2025250     91400   19.3100 -114.4900      10.2       187       132        60
OIR    2025250     91400   19.3100 -114.5000      10.2       187       130        60
OIR    2025250     91400   19.3100 -114.5100      10.2       187       130        60
OIR    2025250     91400   19.3100 -114.5200      10.2       186       131        60
OIR    2025250     91400   19.3100 -114.5300      10.1       186       132        60
OIR    2025250     91400   19.3100 -114.5400      10.1       186       132        60
OIR    2025250     91400   19.3100 -114.5500      10.1       186       132        60
OIR    2025250     91400   19.3100 -114.5600      10.0       185       134        60
OIR    2025250     91400   19.3100 -114.5700       9.9       185       137        60
OIR    2025250     91400   19.3100 -114.5800       9.7       185       140        60
OIR    2025250     91400   19.3100 -116.2100       8.2       160       142        60
OIR    2025250     91400   19.3100 -116.2200       8.2       160       142        60
OIR    2025250     91400   19.3000 -110.9500       5.8        47       135        60
OIR    2025250     91400   19.3000 -110.9600       6.5        44       137        60
OIR    2025250     91400   19.3000 -110.9700       6.8        44       140        60
OIR    2025250     91400   19.3000 -110.9800       7.2        45       141        60
OIR    2025250     91400   19.3000 -112.9000       8.0       171       140        60
OIR    2025250     91400   19.3000 -112.9100       7.9       172       139        60
OIR    2025250     91400   19.3000 -112.9200       7.9       172       137        60
OIR    2025250     91400   19.3000 -112.9300       7.9       172       136        60
OIR    2025250     91400   19.3000 -112.9400       7.9       173       135        60
OIR    2025250     91400   19.3000 -112.9500       7.8       173       134        60
OIR    2025250     91400   19.3000 -112.9600       7.8       173       138        60
OIR    2025250     91400   19.3000 -112.9800       7.8       173       135        60
OIR    2025250     91400   19.3000 -112.9900       7.8       174       128        60
OIR    2025250     91400   19.3000 -113.0000       7.8       174       127        60
OIR    2025250     91400   19.3000 -113.0100       7.8       174       128        60
OIR    2025250     91400   19.3000 -113.0200       7.8       174       128        60
OIR    2025250     91400   19.3000 -113.0300       7.8       174       127        60
OIR    2025250     91400   19.3000 -113.0400       7.8       175       125        60
OIR    2025250     91400   19.3000 -113.0500       7.8       175       126        60
OIR    2025250     91400   19.3000 -113.0600       7.8       175       127        60
OIR    2025250     91400   19.3000 -113.0700       7.8       175       126        60
OIR    2025250     91400   19.3000 -113.0800       7.8       175       123        60
OIR    2025250     91400   19.3000 -113.0900       7.9       175       122        60
OIR    2025250     91400   19.3000 -113.1000       7.9       175       121        60
OIR    2025250     91400   19.3000 -113.1100       7.9       175       121        60
OIR    2025250     91400   19.3000 -113.1200       7.9       175       120        60
OIR    2025250     91400   19.3000 -113.1300       7.9       175       119        60
OIR    2025250     91400   19.3000 -113.1400       7.9       175       117        60
OIR    2025250     91400   19.3000 -113.1500       7.9       175       117        60
OIR    2025250     91400   19.3000 -113.1600       7.9       176       116        60
OIR    2025250     91400   19.3000 -113.1700       7.9       176       115        60
OIR    2025250     91400   19.3000 -113.1800       7.9       176       113        60
OIR    2025250     91400   19.3000 -113.1900       7.9       176       112        60
OIR    2025250     91400   19.3000 -113.2000       7.9       176       112        60
OIR    2025250     91400   19.3000 -113.2100       7.9       176       111        60
OIR    2025250     91400   19.3000 -113.2200       7.9       176       109        60
OIR    2025250     91400   19.3000 -113.2300       7.9       175       108        60
OIR    2025250     91400   19.3000 -113.2400       7.9       175       108        60
OIR    2025250     91400   19.3000 -113.2500       8.0       175       107        60
OIR    2025250     91400   19.3000 -113.2600       8.0       175       104        60
OIR    2025250     91400   19.3000 -113.2700       8.0       175       104        60
OIR    2025250     91400   19.3000 -113.2800       8.0       175       104        60
OIR    2025250     91400   19.3000 -113.2900       8.0       175       104        60
OIR    2025250     91400   19.3000 -113.3000       8.0       175       104        60
OIR    2025250     91400   19.3000 -113.3100       8.0       175       104        60
OIR    2025250     91400   19.3000 -113.3200       8.0       175       104        60
OIR    2025250     91400   19.3000 -113.3300       8.1       175       104        60
OIR    2025250     91400   19.3000 -113.3400       8.1       176       103        60
OIR    2025250     91400   19.3000 -113.3500       8.1       176       104        60
OIR    2025250     91400   19.3000 -113.3600       8.2       176       104        60
OIR    2025250     91400   19.3000 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.3000 -113.3800       8.2       176       104        60
OIR    2025250     91400   19.3000 -113.3900       8.2       176       103        60
OIR    2025250     91400   19.3000 -113.4000       8.3       176       103        60
OIR    2025250     91400   19.3000 -113.4100       8.3       176       103        60
OIR    2025250     91400   19.3000 -113.4200       8.3       176       103        60
OIR    2025250     91400   19.3000 -113.4300       8.4       176       103        60
OIR    2025250     91400   19.3000 -113.4400       8.4       176       103        60
OIR    2025250     91400   19.3000 -113.4500       8.4       176       103        60
OIR    2025250     91400   19.3000 -113.4600       8.5       176       103        60
OIR    2025250     91400   19.3000 -113.4700       8.5       176       104        60
OIR    2025250     91400   19.3000 -113.4800       8.5       176       104        60
OIR    2025250     91400   19.3000 -113.4900       8.6       176       103        60
OIR    2025250     91400   19.3000 -113.5000       8.6       176       103        60
OIR    2025250     91400   19.3000 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.3000 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.3000 -113.5300       8.7       176       104        60
OIR    2025250     91400   19.3000 -113.5400       8.7       176       105        60
OIR    2025250     91400   19.3000 -113.5500       8.7       177       105        60
OIR    2025250     91400   19.3000 -113.5600       8.8       177       105        60
OIR    2025250     91400   19.3000 -113.5700       8.8       177       107        60
OIR    2025250     91400   19.3000 -113.5800       8.9       177       107        60
OIR    2025250     91400   19.3000 -113.5900       8.9       177       107        60
OIR    2025250     91400   19.3000 -113.6000       8.9       177       107        60
OIR    2025250     91400   19.3000 -113.6100       8.9       177       107        60
OIR    2025250     91400   19.3000 -113.6200       9.0       177       107        60
OIR    2025250     91400   19.3000 -113.6300       9.0       177       107        60
OIR    2025250     91400   19.3000 -113.6400       9.0       178       105        60
OIR    2025250     91400   19.3000 -113.6500       9.0       178       107        60
OIR    2025250     91400   19.3000 -113.6600       9.0       178       108        60
OIR    2025250     91400   19.3000 -113.6700       9.0       178       108        60
OIR    2025250     91400   19.3000 -113.6800       9.1       178       108        60
OIR    2025250     91400   19.3000 -113.6900       9.1       178       108        60
OIR    2025250     91400   19.3000 -113.7000       9.1       178       108        60
OIR    2025250     91400   19.3000 -113.7100       9.2       179       108        60
OIR    2025250     91400   19.3000 -113.7200       9.2       179       108        60
OIR    2025250     91400   19.3000 -113.7300       9.3       179       107        60
OIR    2025250     91400   19.3000 -113.7400       9.3       179       107        60
OIR    2025250     91400   19.3000 -113.7500       9.3       179       107        60
OIR    2025250     91400   19.3000 -113.7600       9.3       179       107        60
OIR    2025250     91400   19.3000 -113.7700       9.3       179       108        60
OIR    2025250     91400   19.3000 -113.7800       9.3       180       109        60
OIR    2025250     91400   19.3000 -113.7900       9.4       180       108        60
OIR    2025250     91400   19.3000 -113.8000       9.4       180       107        60
OIR    2025250     91400   19.3000 -113.8100       9.4       180       108        60
OIR    2025250     91400   19.3000 -113.8200       9.4       180       108        60
OIR    2025250     91400   19.3000 -113.8300       9.4       180       108        60
OIR    2025250     91400   19.3000 -113.8400       9.4       180       108        60
OIR    2025250     91400   19.3000 -113.8500       9.5       180       109        60
OIR    2025250     91400   19.3000 -113.8600       9.5       181       109        60
OIR    2025250     91400   19.3000 -113.8700       9.5       181       110        60
OIR    2025250     91400   19.3000 -113.8800       9.5       181       110        60
OIR    2025250     91400   19.3000 -113.8900       9.5       181       111        60
OIR    2025250     91400   19.3000 -113.9000       9.6       181       111        60
OIR    2025250     91400   19.3000 -113.9100       9.6       182       111        60
OIR    2025250     91400   19.3000 -113.9200       9.7       183       111        60
OIR    2025250     91400   19.3000 -113.9300       9.8       183       112        60
OIR    2025250     91400   19.3000 -113.9400       9.9       184       112        60
OIR    2025250     91400   19.3000 -113.9500       9.9       184       112        60
OIR    2025250     91400   19.3000 -113.9600      10.0       184       111        60
OIR    2025250     91400   19.3000 -113.9700      10.0       184       111        60
OIR    2025250     91400   19.3000 -113.9800      10.0       184       112        60
OIR    2025250     91400   19.3000 -113.9900      10.1       185       112        60
OIR    2025250     91400   19.3000 -114.0000      10.1       185       112        60
OIR    2025250     91400   19.3000 -114.0100      10.1       185       112        60
OIR    2025250     91400   19.3000 -114.0200      10.1       185       112        60
OIR    2025250     91400   19.3000 -114.0300      10.1       185       112        60
OIR    2025250     91400   19.3000 -114.0400      10.2       185       112        60
OIR    2025250     91400   19.3000 -114.0500      10.2       185       113        60
OIR    2025250     91400   19.3000 -114.0600      10.2       186       114        60
OIR    2025250     91400   19.3000 -114.0700      10.2       186       115        60
OIR    2025250     91400   19.3000 -114.0800      10.2       186       116        60
OIR    2025250     91400   19.3000 -114.0900      10.2       186       116        60
OIR    2025250     91400   19.3000 -114.1000      10.3       186       116        60
OIR    2025250     91400   19.3000 -114.1100      10.3       186       116        60
OIR    2025250     91400   19.3000 -114.1200      10.3       186       116        60
OIR    2025250     91400   19.3000 -114.1300      10.3       187       116        60
OIR    2025250     91400   19.3000 -114.1400      10.3       187       117        60
OIR    2025250     91400   19.3000 -114.1500      10.4       187       116        60
OIR    2025250     91400   19.3000 -114.1600      10.4       187       116        60
OIR    2025250     91400   19.3000 -114.1700      10.4       187       116        60
OIR    2025250     91400   19.3000 -114.1800      10.4       187       116        60
OIR    2025250     91400   19.3000 -114.1900      10.4       187       116        60
OIR    2025250     91400   19.3000 -114.2000      10.4       187       117        60
OIR    2025250     91400   19.3000 -114.2100      10.4       188       117        60
OIR    2025250     91400   19.3000 -114.2200      10.4       188       117        60
OIR    2025250     91400   19.3000 -114.2300      10.4       188       119        60
OIR    2025250     91400   19.3000 -114.2400      10.3       188       119        60
OIR    2025250     91400   19.3000 -114.2500      10.3       188       120        60
OIR    2025250     91400   19.3000 -114.2600      10.2       189       120        60
OIR    2025250     91400   19.3000 -114.2700      10.1       190       122        60
OIR    2025250     91400   19.3000 -114.2800      10.0       190       124        60
OIR    2025250     91400   19.3000 -114.2900       9.9       190       125        60
OIR    2025250     91400   19.3000 -114.3000       9.8       191       126        60
OIR    2025250     91400   19.3000 -114.3100       9.8       191       127        60
OIR    2025250     91400   19.3000 -114.3200       9.8       191       129        60
OIR    2025250     91400   19.3000 -114.3300       9.8       191       130        60
OIR    2025250     91400   19.3000 -114.3400       9.8       190       128        60
OIR    2025250     91400   19.3000 -114.3500       9.9       190       127        60
OIR    2025250     91400   19.3000 -114.3600      10.0       189       130        60
OIR    2025250     91400   19.3000 -114.3700      10.0       189       133        60
OIR    2025250     91400   19.3000 -114.3800      10.1       189       131        60
OIR    2025250     91400   19.3000 -114.3900      10.1       189       130        60
OIR    2025250     91400   19.3000 -114.4000      10.2       189       132        60
OIR    2025250     91400   19.3000 -114.4100      10.2       188       134        60
OIR    2025250     91400   19.3000 -114.4200      10.3       188       135        60
OIR    2025250     91400   19.3000 -114.4300      10.3       188       134        60
OIR    2025250     91400   19.3000 -114.4400      10.3       188       133        60
OIR    2025250     91400   19.3000 -114.4500      10.3       188       134        60
OIR    2025250     91400   19.3000 -114.4600      10.3       187       135        60
OIR    2025250     91400   19.3000 -114.4700      10.3       187       135        60
OIR    2025250     91400   19.3000 -114.4800      10.3       187       134        60
OIR    2025250     91400   19.3000 -114.4900      10.3       187       133        60
OIR    2025250     91400   19.3000 -114.5000      10.2       187       131        60
OIR    2025250     91400   19.3000 -114.5100      10.2       187       130        60
OIR    2025250     91400   19.3000 -114.5200      10.2       186       131        60
OIR    2025250     91400   19.3000 -114.5300      10.2       186       133        60
OIR    2025250     91400   19.3000 -114.5400      10.2       186       136        60
OIR    2025250     91400   19.3000 -114.5500      10.2       186       139        60
OIR    2025250     91400   19.3000 -114.5600      10.2       186       139        60
OIR    2025250     91400   19.3000 -114.5700      10.1       185       139        60
OIR    2025250     91400   19.3000 -114.5800      10.0       185       140        60
OIR    2025250     91400   19.3000 -116.2000       8.1       159       141        60
OIR    2025250     91400   19.3000 -116.2100       8.1       159       139        60
OIR    2025250     91400   19.3000 -116.2200       8.1       159       140        60
OIR    2025250     91400   19.3000 -116.2300       8.1       160       141        60
OIR    2025250     91400   19.2900 -109.5400       8.8         5       141        60
OIR    2025250     91400   19.2900 -109.5500       8.8         5       132        60
OIR    2025250     91400   19.2900 -110.9500       5.5        47       139        60
OIR    2025250     91400   19.2900 -110.9600       6.3        43       137        60
OIR    2025250     91400   19.2900 -110.9700       6.7        43       138        60
OIR    2025250     91400   19.2900 -110.9800       7.2        45       139        60
OIR    2025250     91400   19.2900 -110.9900       7.7        46       140        60
OIR    2025250     91400   19.2900 -111.0000       7.9        47       141        60
OIR    2025250     91400   19.2900 -112.9000       8.3       170       140        60
OIR    2025250     91400   19.2900 -112.9100       8.0       171       138        60
OIR    2025250     91400   19.2900 -112.9200       7.9       172       137        60
OIR    2025250     91400   19.2900 -112.9300       7.9       172       135        60
OIR    2025250     91400   19.2900 -112.9400       7.9       172       134        60
OIR    2025250     91400   19.2900 -112.9500       7.9       173       133        60
OIR    2025250     91400   19.2900 -112.9600       7.8       173       134        60
OIR    2025250     91400   19.2900 -112.9700       7.8       173       136        60
OIR    2025250     91400   19.2900 -112.9800       7.8       173       135        60
OIR    2025250     91400   19.2900 -112.9900       7.8       174       131        60
OIR    2025250     91400   19.2900 -113.0000       7.8       174       129        60
OIR    2025250     91400   19.2900 -113.0100       7.8       174       128        60
OIR    2025250     91400   19.2900 -113.0200       7.8       174       127        60
OIR    2025250     91400   19.2900 -113.0300       7.8       174       126        60
OIR    2025250     91400   19.2900 -113.0400       7.8       175       126        60
OIR    2025250     91400   19.2900 -113.0500       7.8       175       126        60
OIR    2025250     91400   19.2900 -113.0600       7.8       175       128        60
OIR    2025250     91400   19.2900 -113.0700       7.8       175       128        60
OIR    2025250     91400   19.2900 -113.0800       7.8       175       126        60
OIR    2025250     91400   19.2900 -113.0900       7.9       175       125        60
OIR    2025250     91400   19.2900 -113.1000       7.9       175       123        60
OIR    2025250     91400   19.2900 -113.1100       7.9       175       122        60
OIR    2025250     91400   19.2900 -113.1200       7.9       175       121        60
OIR    2025250     91400   19.2900 -113.1300       7.9       175       119        60
OIR    2025250     91400   19.2900 -113.1400       7.9       175       117        60
OIR    2025250     91400   19.2900 -113.1500       7.9       176       117        60
OIR    2025250     91400   19.2900 -113.1600       7.9       176       116        60
OIR    2025250     91400   19.2900 -113.1700       7.9       176       115        60
OIR    2025250     91400   19.2900 -113.1800       7.9       176       113        60
OIR    2025250     91400   19.2900 -113.1900       7.9       176       113        60
OIR    2025250     91400   19.2900 -113.2000       7.9       176       112        60
OIR    2025250     91400   19.2900 -113.2100       7.9       176       111        60
OIR    2025250     91400   19.2900 -113.2200       7.9       176       110        60
OIR    2025250     91400   19.2900 -113.2300       7.9       176       108        60
OIR    2025250     91400   19.2900 -113.2400       8.0       175       108        60
OIR    2025250     91400   19.2900 -113.2500       8.0       175       107        60
OIR    2025250     91400   19.2900 -113.2600       8.0       175       105        60
OIR    2025250     91400   19.2900 -113.2700       8.0       175       104        60
OIR    2025250     91400   19.2900 -113.2800       8.0       175       104        60
OIR    2025250     91400   19.2900 -113.2900       8.0       175       104        60
OIR    2025250     91400   19.2900 -113.3000       8.0       175       104        60
OIR    2025250     91400   19.2900 -113.3100       8.0       175       104        60
OIR    2025250     91400   19.2900 -113.3200       8.1       176       104        60
OIR    2025250     91400   19.2900 -113.3300       8.1       176       104        60
OIR    2025250     91400   19.2900 -113.3400       8.1       176       104        60
OIR    2025250     91400   19.2900 -113.3500       8.2       176       104        60
OIR    2025250     91400   19.2900 -113.3600       8.2       176       104        60
OIR    2025250     91400   19.2900 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.2900 -113.3800       8.2       176       104        60
OIR    2025250     91400   19.2900 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.2900 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.2900 -113.4100       8.3       176       104        60
OIR    2025250     91400   19.2900 -113.4200       8.3       176       104        60
OIR    2025250     91400   19.2900 -113.4300       8.4       176       103        60
OIR    2025250     91400   19.2900 -113.4400       8.4       176       103        60
OIR    2025250     91400   19.2900 -113.4500       8.5       176       104        60
OIR    2025250     91400   19.2900 -113.4600       8.5       176       104        60
OIR    2025250     91400   19.2900 -113.4700       8.5       176       104        60
OIR    2025250     91400   19.2900 -113.4800       8.6       176       103        60
OIR    2025250     91400   19.2900 -113.4900       8.6       176       104        60
OIR    2025250     91400   19.2900 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.2900 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.2900 -113.5200       8.6       176       104        60
OIR    2025250     91400   19.2900 -113.5300       8.7       176       104        60
OIR    2025250     91400   19.2900 -113.5400       8.7       176       105        60
OIR    2025250     91400   19.2900 -113.5500       8.7       177       105        60
OIR    2025250     91400   19.2900 -113.5600       8.8       177       105        60
OIR    2025250     91400   19.2900 -113.5700       8.8       177       105        60
OIR    2025250     91400   19.2900 -113.5800       8.9       177       107        60
OIR    2025250     91400   19.2900 -113.5900       8.9       177       107        60
OIR    2025250     91400   19.2900 -113.6000       8.9       177       108        60
OIR    2025250     91400   19.2900 -113.6100       8.9       177       107        60
OIR    2025250     91400   19.2900 -113.6200       9.0       177       107        60
OIR    2025250     91400   19.2900 -113.6300       9.0       177       107        60
OIR    2025250     91400   19.2900 -113.6400       9.0       178       107        60
OIR    2025250     91400   19.2900 -113.6500       9.0       178       108        60
OIR    2025250     91400   19.2900 -113.6600       9.0       178       108        60
OIR    2025250     91400   19.2900 -113.6700       9.1       178       108        60
OIR    2025250     91400   19.2900 -113.6800       9.1       178       108        60
OIR    2025250     91400   19.2900 -113.6900       9.1       178       108        60
OIR    2025250     91400   19.2900 -113.7000       9.1       178       108        60
OIR    2025250     91400   19.2900 -113.7100       9.2       179       108        60
OIR    2025250     91400   19.2900 -113.7200       9.3       179       108        60
OIR    2025250     91400   19.2900 -113.7300       9.3       179       107        60
OIR    2025250     91400   19.2900 -113.7400       9.3       179       107        60
OIR    2025250     91400   19.2900 -113.7500       9.3       179       107        60
OIR    2025250     91400   19.2900 -113.7600       9.3       179       108        60
OIR    2025250     91400   19.2900 -113.7700       9.3       180       108        60
OIR    2025250     91400   19.2900 -113.7800       9.4       180       109        60
OIR    2025250     91400   19.2900 -113.7900       9.4       180       108        60
OIR    2025250     91400   19.2900 -113.8000       9.4       180       108        60
OIR    2025250     91400   19.2900 -113.8100       9.4       180       108        60
OIR    2025250     91400   19.2900 -113.8200       9.4       180       108        60
OIR    2025250     91400   19.2900 -113.8300       9.5       180       108        60
OIR    2025250     91400   19.2900 -113.8400       9.5       180       109        60
OIR    2025250     91400   19.2900 -113.8500       9.5       181       109        60
OIR    2025250     91400   19.2900 -113.8600       9.5       181       110        60
OIR    2025250     91400   19.2900 -113.8700       9.5       181       110        60
OIR    2025250     91400   19.2900 -113.8800       9.6       181       110        60
OIR    2025250     91400   19.2900 -113.8900       9.6       182       110        60
OIR    2025250     91400   19.2900 -113.9000       9.7       182       110        60
OIR    2025250     91400   19.2900 -113.9100       9.7       182       110        60
OIR    2025250     91400   19.2900 -113.9200       9.8       183       111        60
OIR    2025250     91400   19.2900 -113.9300       9.9       183       112        60
OIR    2025250     91400   19.2900 -113.9400       9.9       184       113        60
OIR    2025250     91400   19.2900 -113.9500      10.0       184       113        60
OIR    2025250     91400   19.2900 -113.9600      10.0       184       112        60
OIR    2025250     91400   19.2900 -113.9700      10.0       184       112        60
OIR    2025250     91400   19.2900 -113.9800      10.1       185       111        60
OIR    2025250     91400   19.2900 -113.9900      10.1       185       110        60
OIR    2025250     91400   19.2900 -114.0000      10.2       185       111        60
OIR    2025250     91400   19.2900 -114.0100      10.2       185       112        60
OIR    2025250     91400   19.2900 -114.0200      10.2       185       113        60
OIR    2025250     91400   19.2900 -114.0300      10.2       185       114        60
OIR    2025250     91400   19.2900 -114.0400      10.2       185       114        60
OIR    2025250     91400   19.2900 -114.0500      10.2       186       114        60
OIR    2025250     91400   19.2900 -114.0600      10.2       186       114        60
OIR    2025250     91400   19.2900 -114.0700      10.2       186       114        60
OIR    2025250     91400   19.2900 -114.0800      10.3       186       114        60
OIR    2025250     91400   19.2900 -114.0900      10.3       186       115        60
OIR    2025250     91400   19.2900 -114.1000      10.3       186       116        60
OIR    2025250     91400   19.2900 -114.1100      10.3       186       116        60
OIR    2025250     91400   19.2900 -114.1200      10.4       186       116        60
OIR    2025250     91400   19.2900 -114.1300      10.4       187       116        60
OIR    2025250     91400   19.2900 -114.1400      10.4       187       117        60
OIR    2025250     91400   19.2900 -114.1500      10.4       187       117        60
OIR    2025250     91400   19.2900 -114.1600      10.4       187       116        60
OIR    2025250     91400   19.2900 -114.1700      10.4       187       116        60
OIR    2025250     91400   19.2900 -114.1800      10.4       187       116        60
OIR    2025250     91400   19.2900 -114.1900      10.4       187       117        60
OIR    2025250     91400   19.2900 -114.2000      10.4       187       117        60
OIR    2025250     91400   19.2900 -114.2100      10.4       187       119        60
OIR    2025250     91400   19.2900 -114.2200      10.4       188       119        60
OIR    2025250     91400   19.2900 -114.2300      10.4       188       120        60
OIR    2025250     91400   19.2900 -114.2400      10.4       188       120        60
OIR    2025250     91400   19.2900 -114.2500      10.4       188       120        60
OIR    2025250     91400   19.2900 -114.2600      10.3       188       121        60
OIR    2025250     91400   19.2900 -114.2700      10.3       188       122        60
OIR    2025250     91400   19.2900 -114.2800      10.2       189       124        60
OIR    2025250     91400   19.2900 -114.2900      10.1       189       125        60
OIR    2025250     91400   19.2900 -114.3000      10.1       189       126        60
OIR    2025250     91400   19.2900 -114.3100      10.1       190       127        60
OIR    2025250     91400   19.2900 -114.3200      10.1       189       127        60
OIR    2025250     91400   19.2900 -114.3300      10.1       189       128        60
OIR    2025250     91400   19.2900 -114.3400      10.2       189       128        60
OIR    2025250     91400   19.2900 -114.3500      10.2       189       129        60
OIR    2025250     91400   19.2900 -114.3600      10.2       189       130        60
OIR    2025250     91400   19.2900 -114.3700      10.2       189       132        60
OIR    2025250     91400   19.2900 -114.3800      10.2       188       133        60
OIR    2025250     91400   19.2900 -114.3900      10.3       188       132        60
OIR    2025250     91400   19.2900 -114.4000      10.3       188       132        60
OIR    2025250     91400   19.2900 -114.4100      10.4       188       134        60
OIR    2025250     91400   19.2900 -114.4200      10.4       188       136        60
OIR    2025250     91400   19.2900 -114.4300      10.4       188       136        60
OIR    2025250     91400   19.2900 -114.4400      10.4       188       136        60
OIR    2025250     91400   19.2900 -114.4500      10.4       187       136        60
OIR    2025250     91400   19.2900 -114.4600      10.4       187       137        60
OIR    2025250     91400   19.2900 -114.4700      10.4       187       136        60
OIR    2025250     91400   19.2900 -114.4800      10.4       187       136        60
OIR    2025250     91400   19.2900 -114.4900      10.3       187       134        60
OIR    2025250     91400   19.2900 -114.5000      10.3       187       132        60
OIR    2025250     91400   19.2900 -114.5100      10.3       186       131        60
OIR    2025250     91400   19.2900 -114.5200      10.3       186       133        60
OIR    2025250     91400   19.2900 -114.5300      10.3       186       135        60
OIR    2025250     91400   19.2900 -114.5400      10.3       186       139        60
OIR    2025250     91400   19.2900 -114.5800      10.2       185       139        60
OIR    2025250     91400   19.2900 -114.5900      10.0       185       141        60
OIR    2025250     91400   19.2900 -116.1300       7.7       172       142        60
OIR    2025250     91400   19.2900 -116.1900       8.0       160       140        60
OIR    2025250     91400   19.2900 -116.2000       8.0       160       139        60
OIR    2025250     91400   19.2900 -116.2100       8.0       159       138        60
OIR    2025250     91400   19.2900 -116.2200       7.9       160       139        60
OIR    2025250     91400   19.2900 -116.2300       7.8       160       142        60
OIR    2025250     91400   19.2800 -110.9600       5.7        41       140        60
OIR    2025250     91400   19.2800 -110.9700       6.3        42       138        60
OIR    2025250     91400   19.2800 -110.9800       6.8        45       137        60
OIR    2025250     91400   19.2800 -110.9900       7.6        46       139        60
OIR    2025250     91400   19.2800 -111.0000       7.9        47       140        60
OIR    2025250     91400   19.2800 -112.9000       8.5       169       140        60
OIR    2025250     91400   19.2800 -112.9100       8.1       170       138        60
OIR    2025250     91400   19.2800 -112.9200       8.0       171       136        60
OIR    2025250     91400   19.2800 -112.9300       7.9       171       135        60
OIR    2025250     91400   19.2800 -112.9400       7.9       172       134        60
OIR    2025250     91400   19.2800 -112.9500       7.9       172       133        60
OIR    2025250     91400   19.2800 -112.9600       7.8       173       132        60
OIR    2025250     91400   19.2800 -112.9700       7.8       173       131        60
OIR    2025250     91400   19.2800 -112.9800       7.8       173       131        60
OIR    2025250     91400   19.2800 -112.9900       7.8       174       133        60
OIR    2025250     91400   19.2800 -113.0000       7.8       174       134        60
OIR    2025250     91400   19.2800 -113.0100       7.8       174       130        60
OIR    2025250     91400   19.2800 -113.0200       7.8       174       126        60
OIR    2025250     91400   19.2800 -113.0300       7.8       174       126        60
OIR    2025250     91400   19.2800 -113.0400       7.8       175       125        60
OIR    2025250     91400   19.2800 -113.0500       7.8       175       125        60
OIR    2025250     91400   19.2800 -113.0600       7.8       175       126        60
OIR    2025250     91400   19.2800 -113.0700       7.8       175       126        60
OIR    2025250     91400   19.2800 -113.0800       7.8       175       128        60
OIR    2025250     91400   19.2800 -113.0900       7.9       175       130        60
OIR    2025250     91400   19.2800 -113.1000       7.9       175       126        60
OIR    2025250     91400   19.2800 -113.1100       7.9       175       123        60
OIR    2025250     91400   19.2800 -113.1200       7.9       175       121        60
OIR    2025250     91400   19.2800 -113.1300       7.9       175       119        60
OIR    2025250     91400   19.2800 -113.1400       7.9       176       117        60
OIR    2025250     91400   19.2800 -113.1500       7.9       176       116        60
OIR    2025250     91400   19.2800 -113.1600       7.9       176       116        60
OIR    2025250     91400   19.2800 -113.1700       7.9       176       115        60
OIR    2025250     91400   19.2800 -113.1800       7.9       176       113        60
OIR    2025250     91400   19.2800 -113.1900       7.9       176       112        60
OIR    2025250     91400   19.2800 -113.2000       7.9       176       111        60
OIR    2025250     91400   19.2800 -113.2100       7.9       176       110        60
OIR    2025250     91400   19.2800 -113.2200       7.9       176       109        60
OIR    2025250     91400   19.2800 -113.2300       8.0       176       108        60
OIR    2025250     91400   19.2800 -113.2400       8.0       176       108        60
OIR    2025250     91400   19.2800 -113.2500       8.0       176       108        60
OIR    2025250     91400   19.2800 -113.2600       8.0       176       107        60
OIR    2025250     91400   19.2800 -113.2700       8.0       176       105        60
OIR    2025250     91400   19.2800 -113.2800       8.0       176       104        60
OIR    2025250     91400   19.2800 -113.2900       8.0       176       104        60
OIR    2025250     91400   19.2800 -113.3000       8.0       176       104        60
OIR    2025250     91400   19.2800 -113.3100       8.0       176       104        60
OIR    2025250     91400   19.2800 -113.3200       8.1       176       104        60
OIR    2025250     91400   19.2800 -113.3300       8.1       176       104        60
OIR    2025250     91400   19.2800 -113.3400       8.1       176       104        60
OIR    2025250     91400   19.2800 -113.3500       8.2       176       104        60
OIR    2025250     91400   19.2800 -113.3600       8.2       176       104        60
OIR    2025250     91400   19.2800 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.2800 -113.3800       8.2       176       104        60
OIR    2025250     91400   19.2800 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.2800 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.2800 -113.4100       8.3       176       104        60
OIR    2025250     91400   19.2800 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.2800 -113.4300       8.4       176       104        60
OIR    2025250     91400   19.2800 -113.4400       8.4       176       103        60
OIR    2025250     91400   19.2800 -113.4500       8.5       176       104        60
OIR    2025250     91400   19.2800 -113.4600       8.5       176       104        60
OIR    2025250     91400   19.2800 -113.4700       8.5       176       104        60
OIR    2025250     91400   19.2800 -113.4800       8.6       176       103        60
OIR    2025250     91400   19.2800 -113.4900       8.6       176       104        60
OIR    2025250     91400   19.2800 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.2800 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.2800 -113.5200       8.7       176       104        60
OIR    2025250     91400   19.2800 -113.5300       8.7       176       104        60
OIR    2025250     91400   19.2800 -113.5400       8.7       176       104        60
OIR    2025250     91400   19.2800 -113.5500       8.8       177       105        60
OIR    2025250     91400   19.2800 -113.5600       8.8       177       105        60
OIR    2025250     91400   19.2800 -113.5700       8.8       177       105        60
OIR    2025250     91400   19.2800 -113.5800       8.9       177       107        60
OIR    2025250     91400   19.2800 -113.5900       8.9       177       108        60
OIR    2025250     91400   19.2800 -113.6000       8.9       177       108        60
OIR    2025250     91400   19.2800 -113.6100       9.0       177       108        60
OIR    2025250     91400   19.2800 -113.6200       9.0       177       108        60
OIR    2025250     91400   19.2800 -113.6300       9.0       177       108        60
OIR    2025250     91400   19.2800 -113.6400       9.0       178       108        60
OIR    2025250     91400   19.2800 -113.6500       9.0       178       108        60
OIR    2025250     91400   19.2800 -113.6600       9.0       178       109        60
OIR    2025250     91400   19.2800 -113.6700       9.1       178       109        60
OIR    2025250     91400   19.2800 -113.6800       9.1       178       108        60
OIR    2025250     91400   19.2800 -113.6900       9.1       178       108        60
OIR    2025250     91400   19.2800 -113.7000       9.2       178       108        60
OIR    2025250     91400   19.2800 -113.7100       9.2       179       108        60
OIR    2025250     91400   19.2800 -113.7200       9.3       179       108        60
OIR    2025250     91400   19.2800 -113.7300       9.3       179       107        60
OIR    2025250     91400   19.2800 -113.7400       9.3       179       107        60
OIR    2025250     91400   19.2800 -113.7500       9.3       179       108        60
OIR    2025250     91400   19.2800 -113.7600       9.4       179       109        60
OIR    2025250     91400   19.2800 -113.7700       9.4       180       109        60
OIR    2025250     91400   19.2800 -113.7800       9.4       180       109        60
OIR    2025250     91400   19.2800 -113.7900       9.4       180       109        60
OIR    2025250     91400   19.2800 -113.8000       9.4       180       108        60
OIR    2025250     91400   19.2800 -113.8100       9.5       180       108        60
OIR    2025250     91400   19.2800 -113.8200       9.5       180       109        60
OIR    2025250     91400   19.2800 -113.8300       9.5       180       109        60
OIR    2025250     91400   19.2800 -113.8400       9.5       181       109        60
OIR    2025250     91400   19.2800 -113.8500       9.5       181       109        60
OIR    2025250     91400   19.2800 -113.8600       9.6       181       109        60
OIR    2025250     91400   19.2800 -113.8700       9.6       181       110        60
OIR    2025250     91400   19.2800 -113.8800       9.7       182       110        60
OIR    2025250     91400   19.2800 -113.8900       9.7       182       110        60
OIR    2025250     91400   19.2800 -113.9000       9.8       182       110        60
OIR    2025250     91400   19.2800 -113.9100       9.8       183       111        60
OIR    2025250     91400   19.2800 -113.9200       9.9       183       112        60
OIR    2025250     91400   19.2800 -113.9300       9.9       184       112        60
OIR    2025250     91400   19.2800 -113.9400      10.0       184       112        60
OIR    2025250     91400   19.2800 -113.9500      10.0       184       112        60
OIR    2025250     91400   19.2800 -113.9600      10.1       184       112        60
OIR    2025250     91400   19.2800 -113.9700      10.1       185       112        60
OIR    2025250     91400   19.2800 -113.9800      10.1       185       111        60
OIR    2025250     91400   19.2800 -113.9900      10.2       185       111        60
OIR    2025250     91400   19.2800 -114.0000      10.2       185       112        60
OIR    2025250     91400   19.2800 -114.0100      10.2       185       112        60
OIR    2025250     91400   19.2800 -114.0200      10.2       185       113        60
OIR    2025250     91400   19.2800 -114.0300      10.2       185       113        60
OIR    2025250     91400   19.2800 -114.0400      10.2       186       114        60
OIR    2025250     91400   19.2800 -114.0500      10.3       186       115        60
OIR    2025250     91400   19.2800 -114.0600      10.3       186       114        60
OIR    2025250     91400   19.2800 -114.0700      10.3       186       114        60
OIR    2025250     91400   19.2800 -114.0800      10.3       186       114        60
OIR    2025250     91400   19.2800 -114.0900      10.3       186       115        60
OIR    2025250     91400   19.2800 -114.1000      10.4       186       116        60
OIR    2025250     91400   19.2800 -114.1100      10.4       186       116        60
OIR    2025250     91400   19.2800 -114.1200      10.4       187       116        60
OIR    2025250     91400   19.2800 -114.1300      10.4       187       117        60
OIR    2025250     91400   19.2800 -114.1400      10.4       187       117        60
OIR    2025250     91400   19.2800 -114.1500      10.4       187       117        60
OIR    2025250     91400   19.2800 -114.1600      10.4       187       117        60
OIR    2025250     91400   19.2800 -114.1700      10.4       187       117        60
OIR    2025250     91400   19.2800 -114.1800      10.4       187       117        60
OIR    2025250     91400   19.2800 -114.1900      10.4       187       117        60
OIR    2025250     91400   19.2800 -114.2000      10.5       187       117        60
OIR    2025250     91400   19.2800 -114.2100      10.5       187       119        60
OIR    2025250     91400   19.2800 -114.2200      10.5       188       120        60
OIR    2025250     91400   19.2800 -114.2300      10.4       188       121        60
OIR    2025250     91400   19.2800 -114.2400      10.4       188       121        60
OIR    2025250     91400   19.2800 -114.2500      10.4       188       121        60
OIR    2025250     91400   19.2800 -114.2600      10.4       188       121        60
OIR    2025250     91400   19.2800 -114.2700      10.4       188       123        60
OIR    2025250     91400   19.2800 -114.2800      10.4       188       124        60
OIR    2025250     91400   19.2800 -114.2900      10.3       188       126        60
OIR    2025250     91400   19.2800 -114.3000      10.3       189       127        60
OIR    2025250     91400   19.2800 -114.3100      10.2       189       127        60
OIR    2025250     91400   19.2800 -114.3200      10.2       189       126        60
OIR    2025250     91400   19.2800 -114.3300      10.2       189       125        60
OIR    2025250     91400   19.2800 -114.3400      10.2       189       127        60
OIR    2025250     91400   19.2800 -114.3500      10.2       189       130        60
OIR    2025250     91400   19.2800 -114.3600      10.2       188       131        60
OIR    2025250     91400   19.2800 -114.3700      10.3       188       132        60
OIR    2025250     91400   19.2800 -114.3800      10.4       188       133        60
OIR    2025250     91400   19.2800 -114.3900      10.4       188       134        60
OIR    2025250     91400   19.2800 -114.4000      10.4       188       134        60
OIR    2025250     91400   19.2800 -114.4100      10.5       188       134        60
OIR    2025250     91400   19.2800 -114.4200      10.5       188       133        60
OIR    2025250     91400   19.2800 -114.4300      10.5       188       135        60
OIR    2025250     91400   19.2800 -114.4400      10.5       187       136        60
OIR    2025250     91400   19.2800 -114.4500      10.5       187       136        60
OIR    2025250     91400   19.2800 -114.4600      10.5       187       135        60
OIR    2025250     91400   19.2800 -114.4700      10.5       187       135        60
OIR    2025250     91400   19.2800 -114.4800      10.4       187       135        60
OIR    2025250     91400   19.2800 -114.4900      10.4       187       136        60
OIR    2025250     91400   19.2800 -114.5000      10.4       187       137        60
OIR    2025250     91400   19.2800 -114.5100      10.4       186       137        60
OIR    2025250     91400   19.2800 -114.5200      10.4       186       138        60
OIR    2025250     91400   19.2800 -114.5300      10.4       186       138        60
OIR    2025250     91400   19.2800 -114.5400      10.4       186       139        60
OIR    2025250     91400   19.2800 -116.1200       7.3       173       141        60
OIR    2025250     91400   19.2800 -116.1300       7.5       172       138        60
OIR    2025250     91400   19.2800 -116.1400       7.5       170       140        60
OIR    2025250     91400   19.2800 -116.1500       7.5       169       142        60
OIR    2025250     91400   19.2800 -116.1600       7.5       167       142        60
OIR    2025250     91400   19.2800 -116.1700       7.5       165       141        60
OIR    2025250     91400   19.2800 -116.1800       7.6       163       139        60
OIR    2025250     91400   19.2800 -116.1900       7.6       162       137        60
OIR    2025250     91400   19.2800 -116.2000       7.6       161       136        60
OIR    2025250     91400   19.2800 -116.2100       7.5       160       136        60
OIR    2025250     91400   19.2800 -116.2200       7.5       160       137        60
OIR    2025250     91400   19.2800 -116.2300       7.5       159       142        60
OIR    2025250     91400   19.2700 -110.9800       6.3        43       139        60
OIR    2025250     91400   19.2700 -110.9900       7.3        47       141        60
OIR    2025250     91400   19.2700 -111.4800      11.5        47       140        60
OIR    2025250     91400   19.2700 -111.4900      11.7        47       140        60
OIR    2025250     91400   19.2700 -111.5000      12.0        48       140        60
OIR    2025250     91400   19.2700 -111.5100      12.3        49       141        60
OIR    2025250     91400   19.2700 -112.8800       9.2       164       140        60
OIR    2025250     91400   19.2700 -112.8900       9.0       165       139        60
OIR    2025250     91400   19.2700 -112.9000       8.5       166       141        60
OIR    2025250     91400   19.2700 -112.9200       8.0       170       139        60
OIR    2025250     91400   19.2700 -112.9300       7.9       171       137        60
OIR    2025250     91400   19.2700 -112.9400       7.9       171       135        60
OIR    2025250     91400   19.2700 -112.9500       7.9       172       133        60
OIR    2025250     91400   19.2700 -112.9600       7.8       173       131        60
OIR    2025250     91400   19.2700 -112.9700       7.8       173       130        60
OIR    2025250     91400   19.2700 -112.9800       7.8       173       130        60
OIR    2025250     91400   19.2700 -112.9900       7.8       174       131        60
OIR    2025250     91400   19.2700 -113.0000       7.8       174       133        60
OIR    2025250     91400   19.2700 -113.0100       7.8       174       130        60
OIR    2025250     91400   19.2700 -113.0200       7.8       174       126        60
OIR    2025250     91400   19.2700 -113.0300       7.8       174       126        60
OIR    2025250     91400   19.2700 -113.0400       7.8       175       126        60
OIR    2025250     91400   19.2700 -113.0500       7.8       175       125        60
OIR    2025250     91400   19.2700 -113.0600       7.8       175       125        60
OIR    2025250     91400   19.2700 -113.0700       7.8       175       125        60
OIR    2025250     91400   19.2700 -113.0800       7.8       175       127        60
OIR    2025250     91400   19.2700 -113.0900       7.9       175       129        60
OIR    2025250     91400   19.2700 -113.1000       7.9       175       127        60
OIR    2025250     91400   19.2700 -113.1100       7.9       175       123        60
OIR    2025250     91400   19.2700 -113.1200       7.9       175       120        60
OIR    2025250     91400   19.2700 -113.1300       7.9       176       119        60
OIR    2025250     91400   19.2700 -113.1400       7.9       176       116        60
OIR    2025250     91400   19.2700 -113.1500       7.9       176       116        60
OIR    2025250     91400   19.2700 -113.1600       7.9       176       116        60
OIR    2025250     91400   19.2700 -113.1700       7.9       176       115        60
OIR    2025250     91400   19.2700 -113.1800       7.9       176       113        60
OIR    2025250     91400   19.2700 -113.1900       7.9       176       112        60
OIR    2025250     91400   19.2700 -113.2000       7.9       176       111        60
OIR    2025250     91400   19.2700 -113.2100       7.9       176       110        60
OIR    2025250     91400   19.2700 -113.2200       8.0       176       109        60
OIR    2025250     91400   19.2700 -113.2300       8.0       176       108        60
OIR    2025250     91400   19.2700 -113.2400       8.0       176       108        60
OIR    2025250     91400   19.2700 -113.2500       8.0       176       109        60
OIR    2025250     91400   19.2700 -113.2600       8.0       176       109        60
OIR    2025250     91400   19.2700 -113.2700       8.0       176       107        60
OIR    2025250     91400   19.2700 -113.2800       8.0       176       105        60
OIR    2025250     91400   19.2700 -113.2900       8.0       176       105        60
OIR    2025250     91400   19.2700 -113.3000       8.0       176       107        60
OIR    2025250     91400   19.2700 -113.3100       8.1       176       104        60
OIR    2025250     91400   19.2700 -113.3200       8.1       176       104        60
OIR    2025250     91400   19.2700 -113.3300       8.1       176       104        60
OIR    2025250     91400   19.2700 -113.3400       8.2       176       104        60
OIR    2025250     91400   19.2700 -113.3500       8.2       176       103        60
OIR    2025250     91400   19.2700 -113.3600       8.2       176       104        60
OIR    2025250     91400   19.2700 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.2700 -113.3800       8.2       176       104        60
OIR    2025250     91400   19.2700 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.2700 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.2700 -113.4100       8.3       176       104        60
OIR    2025250     91400   19.2700 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.2700 -113.4300       8.4       176       104        60
OIR    2025250     91400   19.2700 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.2700 -113.4500       8.5       176       103        60
OIR    2025250     91400   19.2700 -113.4600       8.5       176       103        60
OIR    2025250     91400   19.2700 -113.4700       8.6       176       103        60
OIR    2025250     91400   19.2700 -113.4800       8.6       176       104        60
OIR    2025250     91400   19.2700 -113.4900       8.6       176       104        60
OIR    2025250     91400   19.2700 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.2700 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.2700 -113.5200       8.7       176       104        60
OIR    2025250     91400   19.2700 -113.5300       8.7       176       104        60
OIR    2025250     91400   19.2700 -113.5400       8.7       176       104        60
OIR    2025250     91400   19.2700 -113.5500       8.8       177       104        60
OIR    2025250     91400   19.2700 -113.5600       8.8       177       105        60
OIR    2025250     91400   19.2700 -113.5700       8.8       177       105        60
OIR    2025250     91400   19.2700 -113.5800       8.9       177       107        60
OIR    2025250     91400   19.2700 -113.5900       8.9       177       108        60
OIR    2025250     91400   19.2700 -113.6000       8.9       177       109        60
OIR    2025250     91400   19.2700 -113.6100       9.0       177       108        60
OIR    2025250     91400   19.2700 -113.6200       9.0       177       108        60
OIR    2025250     91400   19.2700 -113.6300       9.0       177       108        60
OIR    2025250     91400   19.2700 -113.6400       9.0       178       108        60
OIR    2025250     91400   19.2700 -113.6500       9.0       178       109        60
OIR    2025250     91400   19.2700 -113.6600       9.1       178       109        60
OIR    2025250     91400   19.2700 -113.6700       9.1       178       109        60
OIR    2025250     91400   19.2700 -113.6800       9.1       178       110        60
OIR    2025250     91400   19.2700 -113.6900       9.1       178       110        60
OIR    2025250     91400   19.2700 -113.7000       9.2       179       109        60
OIR    2025250     91400   19.2700 -113.7100       9.3       179       108        60
OIR    2025250     91400   19.2700 -113.7200       9.3       179       108        60
OIR    2025250     91400   19.2700 -113.7300       9.3       179       108        60
OIR    2025250     91400   19.2700 -113.7400       9.3       179       108        60
OIR    2025250     91400   19.2700 -113.7500       9.4       179       109        60
OIR    2025250     91400   19.2700 -113.7600       9.4       180       109        60
OIR    2025250     91400   19.2700 -113.7700       9.4       180       109        60
OIR    2025250     91400   19.2700 -113.7800       9.4       180       110        60
OIR    2025250     91400   19.2700 -113.7900       9.4       180       109        60
OIR    2025250     91400   19.2700 -113.8000       9.5       180       108        60
OIR    2025250     91400   19.2700 -113.8100       9.5       180       108        60
OIR    2025250     91400   19.2700 -113.8200       9.5       180       109        60
OIR    2025250     91400   19.2700 -113.8300       9.5       180       110        60
OIR    2025250     91400   19.2700 -113.8400       9.6       181       110        60
OIR    2025250     91400   19.2700 -113.8500       9.6       181       109        60
OIR    2025250     91400   19.2700 -113.8600       9.6       181       109        60
OIR    2025250     91400   19.2700 -113.8700       9.7       181       110        60
OIR    2025250     91400   19.2700 -113.8800       9.7       182       111        60
OIR    2025250     91400   19.2700 -113.8900       9.8       182       110        60
OIR    2025250     91400   19.2700 -113.9000       9.9       183       110        60
OIR    2025250     91400   19.2700 -113.9100       9.9       183       111        60
OIR    2025250     91400   19.2700 -113.9200      10.0       183       113        60
OIR    2025250     91400   19.2700 -113.9300      10.0       184       112        60
OIR    2025250     91400   19.2700 -113.9400      10.0       184       111        60
OIR    2025250     91400   19.2700 -113.9500      10.1       184       111        60
OIR    2025250     91400   19.2700 -113.9600      10.1       185       112        60
OIR    2025250     91400   19.2700 -113.9700      10.2       185       112        60
OIR    2025250     91400   19.2700 -113.9800      10.2       185       112        60
OIR    2025250     91400   19.2700 -113.9900      10.2       185       112        60
OIR    2025250     91400   19.2700 -114.0000      10.2       185       112        60
OIR    2025250     91400   19.2700 -114.0100      10.3       185       113        60
OIR    2025250     91400   19.2700 -114.0200      10.3       185       113        60
OIR    2025250     91400   19.2700 -114.0300      10.3       186       112        60
OIR    2025250     91400   19.2700 -114.0400      10.3       186       112        60
OIR    2025250     91400   19.2700 -114.0500      10.3       186       114        60
OIR    2025250     91400   19.2700 -114.0600      10.3       186       115        60
OIR    2025250     91400   19.2700 -114.0700      10.3       186       115        60
OIR    2025250     91400   19.2700 -114.0800      10.3       186       115        60
OIR    2025250     91400   19.2700 -114.0900      10.4       186       115        60
OIR    2025250     91400   19.2700 -114.1000      10.4       186       116        60
OIR    2025250     91400   19.2700 -114.1100      10.4       186       116        60
OIR    2025250     91400   19.2700 -114.1200      10.4       187       117        60
OIR    2025250     91400   19.2700 -114.1300      10.4       187       117        60
OIR    2025250     91400   19.2700 -114.1400      10.4       187       116        60
OIR    2025250     91400   19.2700 -114.1500      10.5       187       116        60
OIR    2025250     91400   19.2700 -114.1600      10.5       187       117        60
OIR    2025250     91400   19.2700 -114.1700      10.5       187       119        60
OIR    2025250     91400   19.2700 -114.1800      10.5       187       119        60
OIR    2025250     91400   19.2700 -114.1900      10.5       187       119        60
OIR    2025250     91400   19.2700 -114.2000      10.5       187       120        60
OIR    2025250     91400   19.2700 -114.2100      10.5       187       121        60
OIR    2025250     91400   19.2700 -114.2200      10.5       187       121        60
OIR    2025250     91400   19.2700 -114.2300      10.5       188       121        60
OIR    2025250     91400   19.2700 -114.2400      10.5       188       120        60
OIR    2025250     91400   19.2700 -114.2500      10.5       188       121        60
OIR    2025250     91400   19.2700 -114.2600      10.4       188       122        60
OIR    2025250     91400   19.2700 -114.2700      10.4       188       122        60
OIR    2025250     91400   19.2700 -114.2800      10.4       188       123        60
OIR    2025250     91400   19.2700 -114.2900      10.4       188       124        60
OIR    2025250     91400   19.2700 -114.3000      10.4       188       125        60
OIR    2025250     91400   19.2700 -114.3100      10.3       188       126        60
OIR    2025250     91400   19.2700 -114.3200      10.3       189       126        60
OIR    2025250     91400   19.2700 -114.3300      10.3       189       126        60
OIR    2025250     91400   19.2700 -114.3400      10.3       189       128        60
OIR    2025250     91400   19.2700 -114.3500      10.3       188       131        60
OIR    2025250     91400   19.2700 -114.3600      10.4       188       133        60
OIR    2025250     91400   19.2700 -114.3700      10.4       188       131        60
OIR    2025250     91400   19.2700 -114.3800      10.4       188       131        60
OIR    2025250     91400   19.2700 -114.3900      10.5       188       134        60
OIR    2025250     91400   19.2700 -114.4000      10.5       188       136        60
OIR    2025250     91400   19.2700 -114.4100      10.5       188       134        60
OIR    2025250     91400   19.2700 -114.4200      10.5       188       131        60
OIR    2025250     91400   19.2700 -114.4300      10.5       187       133        60
OIR    2025250     91400   19.2700 -114.4400      10.5       187       135        60
OIR    2025250     91400   19.2700 -114.4500      10.5       187       135        60
OIR    2025250     91400   19.2700 -114.4600      10.5       187       134        60
OIR    2025250     91400   19.2700 -114.4700      10.5       187       132        60
OIR    2025250     91400   19.2700 -114.4800      10.5       187       134        60
OIR    2025250     91400   19.2700 -114.4900      10.5       187       135        60
OIR    2025250     91400   19.2700 -114.5000      10.5       187       138        60
OIR    2025250     91400   19.2700 -114.5400      10.4       186       141        60
OIR    2025250     91400   19.2700 -114.5500      10.4       186       141        60
OIR    2025250     91400   19.2700 -116.1000       6.7       174       142        60
OIR    2025250     91400   19.2700 -116.1100       6.9       173       138        60
OIR    2025250     91400   19.2700 -116.1200       7.1       173       137        60
OIR    2025250     91400   19.2700 -116.1300       7.1       172       136        60
OIR    2025250     91400   19.2700 -116.1400       7.2       170       136        60
OIR    2025250     91400   19.2700 -116.1500       7.2       169       138        60
OIR    2025250     91400   19.2700 -116.1600       7.2       168       139        60
OIR    2025250     91400   19.2700 -116.1700       7.2       166       139        60
OIR    2025250     91400   19.2700 -116.1800       7.1       165       139        60
OIR    2025250     91400   19.2700 -116.1900       7.0       164       137        60
OIR    2025250     91400   19.2700 -116.2000       7.0       163       135        60
OIR    2025250     91400   19.2700 -116.2100       7.1       161       136        60
OIR    2025250     91400   19.2700 -116.2200       7.1       161       137        60
OIR    2025250     91400   19.2700 -116.2300       7.2       159       139        60
OIR    2025250     91400   19.2700 -116.2400       7.1       158       143        60
OIR    2025250     91400   19.2600 -111.0700       9.8        53       141        60
OIR    2025250     91400   19.2600 -111.0800      10.3        54       141        60
OIR    2025250     91400   19.2600 -111.4800      10.9        48       139        60
OIR    2025250     91400   19.2600 -111.4900      11.2        48       139        60
OIR    2025250     91400   19.2600 -111.5000      11.5        50       139        60
OIR    2025250     91400   19.2600 -111.5100      11.6        52       139        60
OIR    2025250     91400   19.2600 -111.5200      11.5        55       139        60
OIR    2025250     91400   19.2600 -111.5300      10.8        61       140        60
OIR    2025250     91400   19.2600 -112.8700       9.3       162       139        60
OIR    2025250     91400   19.2600 -112.8800       9.2       163       136        60
OIR    2025250     91400   19.2600 -112.8900       9.0       163       135        60
OIR    2025250     91400   19.2600 -112.9000       8.6       165       140        60
OIR    2025250     91400   19.2600 -112.9300       7.9       170       140        60
OIR    2025250     91400   19.2600 -112.9400       7.9       171       136        60
OIR    2025250     91400   19.2600 -112.9500       7.9       172       132        60
OIR    2025250     91400   19.2600 -112.9600       7.9       172       131        60
OIR    2025250     91400   19.2600 -112.9700       7.8       173       130        60
OIR    2025250     91400   19.2600 -112.9800       7.8       173       130        60
OIR    2025250     91400   19.2600 -112.9900       7.8       174       129        60
OIR    2025250     91400   19.2600 -113.0000       7.8       174       129        60
OIR    2025250     91400   19.2600 -113.0100       7.9       174       128        60
OIR    2025250     91400   19.2600 -113.0200       7.9       174       127        60
OIR    2025250     91400   19.2600 -113.0300       7.9       174       126        60
OIR    2025250     91400   19.2600 -113.0400       7.9       175       126        60
OIR    2025250     91400   19.2600 -113.0500       7.8       175       126        60
OIR    2025250     91400   19.2600 -113.0600       7.8       175       125        60
OIR    2025250     91400   19.2600 -113.0700       7.8       175       125        60
OIR    2025250     91400   19.2600 -113.0800       7.8       175       125        60
OIR    2025250     91400   19.2600 -113.0900       7.9       175       126        60
OIR    2025250     91400   19.2600 -113.1000       7.9       175       125        60
OIR    2025250     91400   19.2600 -113.1100       7.9       175       123        60
OIR    2025250     91400   19.2600 -113.1200       7.9       175       121        60
OIR    2025250     91400   19.2600 -113.1300       7.9       176       119        60
OIR    2025250     91400   19.2600 -113.1400       7.9       176       116        60
OIR    2025250     91400   19.2600 -113.1500       7.9       176       116        60
OIR    2025250     91400   19.2600 -113.1600       7.9       176       116        60
OIR    2025250     91400   19.2600 -113.1700       7.9       176       115        60
OIR    2025250     91400   19.2600 -113.1800       7.9       176       114        60
OIR    2025250     91400   19.2600 -113.1900       7.9       176       113        60
OIR    2025250     91400   19.2600 -113.2000       7.9       176       112        60
OIR    2025250     91400   19.2600 -113.2100       8.0       176       111        60
OIR    2025250     91400   19.2600 -113.2200       8.0       176       110        60
OIR    2025250     91400   19.2600 -113.2300       8.0       176       109        60
OIR    2025250     91400   19.2600 -113.2400       8.0       176       108        60
OIR    2025250     91400   19.2600 -113.2500       8.0       176       108        60
OIR    2025250     91400   19.2600 -113.2600       8.0       176       109        60
OIR    2025250     91400   19.2600 -113.2700       8.0       176       107        60
OIR    2025250     91400   19.2600 -113.2800       8.0       176       105        60
OIR    2025250     91400   19.2600 -113.2900       8.0       176       105        60
OIR    2025250     91400   19.2600 -113.3000       8.1       176       107        60
OIR    2025250     91400   19.2600 -113.3100       8.1       176       105        60
OIR    2025250     91400   19.2600 -113.3200       8.1       176       104        60
OIR    2025250     91400   19.2600 -113.3300       8.1       176       104        60
OIR    2025250     91400   19.2600 -113.3400       8.2       176       104        60
OIR    2025250     91400   19.2600 -113.3500       8.2       176       104        60
OIR    2025250     91400   19.2600 -113.3600       8.2       176       104        60
OIR    2025250     91400   19.2600 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.2600 -113.3800       8.3       176       104        60
OIR    2025250     91400   19.2600 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.2600 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.2600 -113.4100       8.3       176       104        60
OIR    2025250     91400   19.2600 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.2600 -113.4300       8.4       176       104        60
OIR    2025250     91400   19.2600 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.2600 -113.4500       8.5       176       103        60
OIR    2025250     91400   19.2600 -113.4600       8.5       176       103        60
OIR    2025250     91400   19.2600 -113.4700       8.6       176       103        60
OIR    2025250     91400   19.2600 -113.4800       8.6       176       104        60
OIR    2025250     91400   19.2600 -113.4900       8.6       176       104        60
OIR    2025250     91400   19.2600 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.2600 -113.5100       8.6       176       104        60
OIR    2025250     91400   19.2600 -113.5200       8.7       176       104        60
OIR    2025250     91400   19.2600 -113.5300       8.7       176       104        60
OIR    2025250     91400   19.2600 -113.5400       8.7       176       104        60
OIR    2025250     91400   19.2600 -113.5500       8.8       177       104        60
OIR    2025250     91400   19.2600 -113.5600       8.8       177       104        60
OIR    2025250     91400   19.2600 -113.5700       8.8       177       105        60
OIR    2025250     91400   19.2600 -113.5800       8.9       177       107        60
OIR    2025250     91400   19.2600 -113.5900       8.9       177       108        60
OIR    2025250     91400   19.2600 -113.6000       8.9       177       109        60
OIR    2025250     91400   19.2600 -113.6100       9.0       177       109        60
OIR    2025250     91400   19.2600 -113.6200       9.0       177       108        60
OIR    2025250     91400   19.2600 -113.6300       9.0       177       108        60
OIR    2025250     91400   19.2600 -113.6400       9.0       178       109        60
OIR    2025250     91400   19.2600 -113.6500       9.0       178       109        60
OIR    2025250     91400   19.2600 -113.6600       9.1       178       109        60
OIR    2025250     91400   19.2600 -113.6700       9.1       178       110        60
OIR    2025250     91400   19.2600 -113.6800       9.1       178       110        60
OIR    2025250     91400   19.2600 -113.6900       9.2       178       111        60
OIR    2025250     91400   19.2600 -113.7000       9.2       179       111        60
OIR    2025250     91400   19.2600 -113.7100       9.3       179       109        60
OIR    2025250     91400   19.2600 -113.7200       9.3       179       108        60
OIR    2025250     91400   19.2600 -113.7300       9.3       179       108        60
OIR    2025250     91400   19.2600 -113.7400       9.3       179       108        60
OIR    2025250     91400   19.2600 -113.7500       9.4       179       109        60
OIR    2025250     91400   19.2600 -113.7600       9.4       180       109        60
OIR    2025250     91400   19.2600 -113.7700       9.4       180       109        60
OIR    2025250     91400   19.2600 -113.7800       9.4       180       109        60
OIR    2025250     91400   19.2600 -113.7900       9.5       180       109        60
OIR    2025250     91400   19.2600 -113.8000       9.5       180       109        60
OIR    2025250     91400   19.2600 -113.8100       9.5       180       109        60
OIR    2025250     91400   19.2600 -113.8200       9.5       180       110        60
OIR    2025250     91400   19.2600 -113.8300       9.6       181       110        60
OIR    2025250     91400   19.2600 -113.8400       9.6       181       110        60
OIR    2025250     91400   19.2600 -113.8500       9.7       181       110        60
OIR    2025250     91400   19.2600 -113.8600       9.7       181       110        60
OIR    2025250     91400   19.2600 -113.8700       9.8       182       110        60
OIR    2025250     91400   19.2600 -113.8800       9.8       182       110        60
OIR    2025250     91400   19.2600 -113.8900       9.9       182       110        60
OIR    2025250     91400   19.2600 -113.9000       9.9       183       110        60
OIR    2025250     91400   19.2600 -113.9100      10.0       183       111        60
OIR    2025250     91400   19.2600 -113.9200      10.0       184       112        60
OIR    2025250     91400   19.2600 -113.9300      10.0       184       112        60
OIR    2025250     91400   19.2600 -113.9400      10.1       184       111        60
OIR    2025250     91400   19.2600 -113.9500      10.1       184       110        60
OIR    2025250     91400   19.2600 -113.9600      10.2       185       111        60
OIR    2025250     91400   19.2600 -113.9700      10.2       185       111        60
OIR    2025250     91400   19.2600 -113.9800      10.2       185       112        60
OIR    2025250     91400   19.2600 -113.9900      10.3       185       112        60
OIR    2025250     91400   19.2600 -114.0000      10.3       185       112        60
OIR    2025250     91400   19.2600 -114.0100      10.3       185       113        60
OIR    2025250     91400   19.2600 -114.0200      10.3       186       113        60
OIR    2025250     91400   19.2600 -114.0300      10.3       186       112        60
OIR    2025250     91400   19.2600 -114.0400      10.3       186       111        60
OIR    2025250     91400   19.2600 -114.0500      10.3       186       113        60
OIR    2025250     91400   19.2600 -114.0600      10.3       186       115        60
OIR    2025250     91400   19.2600 -114.0700      10.3       186       115        60
OIR    2025250     91400   19.2600 -114.0800      10.4       186       115        60
OIR    2025250     91400   19.2600 -114.0900      10.4       186       116        60
OIR    2025250     91400   19.2600 -114.1000      10.4       186       116        60
OIR    2025250     91400   19.2600 -114.1100      10.4       186       116        60
OIR    2025250     91400   19.2600 -114.1200      10.4       187       116        60
OIR    2025250     91400   19.2600 -114.1300      10.5       187       116        60
OIR    2025250     91400   19.2600 -114.1400      10.5       187       116        60
OIR    2025250     91400   19.2600 -114.1500      10.5       187       116        60
OIR    2025250     91400   19.2600 -114.1600      10.5       187       116        60
OIR    2025250     91400   19.2600 -114.1700      10.5       187       119        60
OIR    2025250     91400   19.2600 -114.1800      10.5       187       120        60
OIR    2025250     91400   19.2600 -114.1900      10.5       187       120        60
OIR    2025250     91400   19.2600 -114.2000      10.5       187       120        60
OIR    2025250     91400   19.2600 -114.2100      10.5       187       121        60
OIR    2025250     91400   19.2600 -114.2200      10.5       187       122        60
OIR    2025250     91400   19.2600 -114.2300      10.5       188       121        60
OIR    2025250     91400   19.2600 -114.2400      10.5       188       120        60
OIR    2025250     91400   19.2600 -114.2500      10.5       188       120        60
OIR    2025250     91400   19.2600 -114.2600      10.5       188       122        60
OIR    2025250     91400   19.2600 -114.2700      10.4       188       123        60
OIR    2025250     91400   19.2600 -114.2800      10.4       188       122        60
OIR    2025250     91400   19.2600 -114.2900      10.4       188       121        60
OIR    2025250     91400   19.2600 -114.3000      10.4       188       123        60
OIR    2025250     91400   19.2600 -114.3100      10.4       188       124        60
OIR    2025250     91400   19.2600 -114.3200      10.4       188       127        60
OIR    2025250     91400   19.2600 -114.3300      10.4       188       129        60
OIR    2025250     91400   19.2600 -114.3400      10.4       188       131        60
OIR    2025250     91400   19.2600 -114.3500      10.4       188       133        60
OIR    2025250     91400   19.2600 -114.3600      10.4       188       135        60
OIR    2025250     91400   19.2600 -114.3700      10.5       188       132        60
OIR    2025250     91400   19.2600 -114.3800      10.5       188       129        60
OIR    2025250     91400   19.2600 -114.3900      10.5       188       132        60
OIR    2025250     91400   19.2600 -114.4000      10.6       188       136        60
OIR    2025250     91400   19.2600 -114.4100      10.6       188       135        60
OIR    2025250     91400   19.2600 -114.4200      10.6       188       131        60
OIR    2025250     91400   19.2600 -114.4300      10.6       187       131        60
OIR    2025250     91400   19.2600 -114.4400      10.6       187       134        60
OIR    2025250     91400   19.2600 -114.4500      10.6       187       135        60
OIR    2025250     91400   19.2600 -114.4600      10.6       187       132        60
OIR    2025250     91400   19.2600 -114.4700      10.6       187       129        60
OIR    2025250     91400   19.2600 -114.4800      10.5       187       130        60
OIR    2025250     91400   19.2600 -114.4900      10.5       187       131        60
OIR    2025250     91400   19.2600 -114.5000      10.5       187       136        60
OIR    2025250     91400   19.2600 -114.5100      10.5       186       141        60
OIR    2025250     91400   19.2600 -116.1000       6.5       173       141        60
OIR    2025250     91400   19.2600 -116.1100       6.7       172       137        60
OIR    2025250     91400   19.2600 -116.1200       6.8       172       136        60
OIR    2025250     91400   19.2600 -116.1300       6.9       171       135        60
OIR    2025250     91400   19.2600 -116.1400       6.9       171       135        60
OIR    2025250     91400   19.2600 -116.1500       6.9       170       135        60
OIR    2025250     91400   19.2600 -116.1600       6.9       169       136        60
OIR    2025250     91400   19.2600 -116.1700       6.9       167       137        60
OIR    2025250     91400   19.2600 -116.1800       6.8       166       137        60
OIR    2025250     91400   19.2600 -116.1900       6.7       165       136        60
OIR    2025250     91400   19.2600 -116.2000       6.7       164       135        60
OIR    2025250     91400   19.2600 -116.2100       6.7       163       135        60
OIR    2025250     91400   19.2600 -116.2200       6.7       162       136        60
OIR    2025250     91400   19.2600 -116.2300       6.5       160       138        60
OIR    2025250     91400   19.2600 -116.2400       6.3       158       140        60
OIR    2025250     91400   19.2600 -116.2500       5.8       156       142        60
OIR    2025250     91400   19.2500 -111.4700       9.9        50       141        60
OIR    2025250     91400   19.2500 -111.4800      10.2        50       139        60
OIR    2025250     91400   19.2500 -111.4900      10.5        51       138        60
OIR    2025250     91400   19.2500 -111.5000      10.8        52       138        60
OIR    2025250     91400   19.2500 -111.5100      10.9        54       138        60
OIR    2025250     91400   19.2500 -111.5200      10.9        57       138        60
OIR    2025250     91400   19.2500 -111.5300      10.4        62       137        60
OIR    2025250     91400   19.2500 -111.5400      10.4        64       140        60
OIR    2025250     91400   19.2500 -112.8600       9.4       160       142        60
OIR    2025250     91400   19.2500 -112.8700       9.3       161       139        60
OIR    2025250     91400   19.2500 -112.8800       9.2       162       137        60
OIR    2025250     91400   19.2500 -112.8900       8.9       162       135        60
OIR    2025250     91400   19.2500 -112.9000       8.6       163       139        60
OIR    2025250     91400   19.2500 -112.9300       8.0       169       140        60
OIR    2025250     91400   19.2500 -112.9400       7.9       170       138        60
OIR    2025250     91400   19.2500 -112.9500       7.9       171       136        60
OIR    2025250     91400   19.2500 -112.9600       7.9       172       134        60
OIR    2025250     91400   19.2500 -112.9700       7.9       173       133        60
OIR    2025250     91400   19.2500 -112.9800       7.9       173       131        60
OIR    2025250     91400   19.2500 -112.9900       7.9       174       130        60
OIR    2025250     91400   19.2500 -113.0000       7.9       174       129        60
OIR    2025250     91400   19.2500 -113.0100       7.9       174       129        60
OIR    2025250     91400   19.2500 -113.0200       7.9       174       129        60
OIR    2025250     91400   19.2500 -113.0300       7.9       174       130        60
OIR    2025250     91400   19.2500 -113.0400       7.9       175       129        60
OIR    2025250     91400   19.2500 -113.0500       7.9       175       129        60
OIR    2025250     91400   19.2500 -113.0600       7.8       175       127        60
OIR    2025250     91400   19.2500 -113.0700       7.8       175       126        60
OIR    2025250     91400   19.2500 -113.0800       7.8       175       125        60
OIR    2025250     91400   19.2500 -113.0900       7.9       175       125        60
OIR    2025250     91400   19.2500 -113.1000       7.9       175       124        60
OIR    2025250     91400   19.2500 -113.1100       7.9       175       122        60
OIR    2025250     91400   19.2500 -113.1200       7.9       175       120        60
OIR    2025250     91400   19.2500 -113.1300       7.9       176       119        60
OIR    2025250     91400   19.2500 -113.1400       7.9       176       116        60
OIR    2025250     91400   19.2500 -113.1500       7.9       176       116        60
OIR    2025250     91400   19.2500 -113.1600       7.9       176       116        60
OIR    2025250     91400   19.2500 -113.1700       7.9       176       115        60
OIR    2025250     91400   19.2500 -113.1800       7.9       176       115        60
OIR    2025250     91400   19.2500 -113.1900       7.9       176       114        60
OIR    2025250     91400   19.2500 -113.2000       7.9       176       113        60
OIR    2025250     91400   19.2500 -113.2100       8.0       176       112        60
OIR    2025250     91400   19.2500 -113.2200       8.0       176       111        60
OIR    2025250     91400   19.2500 -113.2300       8.0       176       109        60
OIR    2025250     91400   19.2500 -113.2400       8.0       176       108        60
OIR    2025250     91400   19.2500 -113.2500       8.0       176       108        60
OIR    2025250     91400   19.2500 -113.2600       8.0       176       108        60
OIR    2025250     91400   19.2500 -113.2700       8.0       176       107        60
OIR    2025250     91400   19.2500 -113.2800       8.0       176       107        60
OIR    2025250     91400   19.2500 -113.2900       8.0       176       107        60
OIR    2025250     91400   19.2500 -113.3000       8.1       176       107        60
OIR    2025250     91400   19.2500 -113.3100       8.1       176       105        60
OIR    2025250     91400   19.2500 -113.3200       8.1       176       104        60
OIR    2025250     91400   19.2500 -113.3300       8.1       176       104        60
OIR    2025250     91400   19.2500 -113.3400       8.2       176       104        60
OIR    2025250     91400   19.2500 -113.3500       8.2       176       104        60
OIR    2025250     91400   19.2500 -113.3600       8.2       176       104        60
OIR    2025250     91400   19.2500 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.2500 -113.3800       8.3       176       104        60
OIR    2025250     91400   19.2500 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.2500 -113.4000       8.3       176       103        60
OIR    2025250     91400   19.2500 -113.4100       8.3       176       103        60
OIR    2025250     91400   19.2500 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.2500 -113.4300       8.4       176       104        60
OIR    2025250     91400   19.2500 -113.4400       8.5       176       103        60
OIR    2025250     91400   19.2500 -113.4500       8.5       176       103        60
OIR    2025250     91400   19.2500 -113.4600       8.5       176       103        60
OIR    2025250     91400   19.2500 -113.4700       8.6       176       103        60
OIR    2025250     91400   19.2500 -113.4800       8.6       176       104        60
OIR    2025250     91400   19.2500 -113.4900       8.6       176       104        60
OIR    2025250     91400   19.2500 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.2500 -113.5100       8.7       176       104        60
OIR    2025250     91400   19.2500 -113.5200       8.7       176       104        60
OIR    2025250     91400   19.2500 -113.5300       8.7       176       104        60
OIR    2025250     91400   19.2500 -113.5400       8.8       176       104        60
OIR    2025250     91400   19.2500 -113.5500       8.8       177       104        60
OIR    2025250     91400   19.2500 -113.5600       8.8       177       105        60
OIR    2025250     91400   19.2500 -113.5700       8.9       177       105        60
OIR    2025250     91400   19.2500 -113.5800       8.9       177       107        60
OIR    2025250     91400   19.2500 -113.5900       8.9       177       107        60
OIR    2025250     91400   19.2500 -113.6000       8.9       177       108        60
OIR    2025250     91400   19.2500 -113.6100       9.0       177       108        60
OIR    2025250     91400   19.2500 -113.6200       9.0       177       109        60
OIR    2025250     91400   19.2500 -113.6300       9.0       177       109        60
OIR    2025250     91400   19.2500 -113.6400       9.0       178       109        60
OIR    2025250     91400   19.2500 -113.6500       9.1       178       110        60
OIR    2025250     91400   19.2500 -113.6600       9.1       178       110        60
OIR    2025250     91400   19.2500 -113.6700       9.1       178       110        60
OIR    2025250     91400   19.2500 -113.6800       9.1       178       111        60
OIR    2025250     91400   19.2500 -113.6900       9.2       178       111        60
OIR    2025250     91400   19.2500 -113.7000       9.3       179       112        60
OIR    2025250     91400   19.2500 -113.7100       9.3       179       110        60
OIR    2025250     91400   19.2500 -113.7200       9.3       179       109        60
OIR    2025250     91400   19.2500 -113.7300       9.3       179       109        60
OIR    2025250     91400   19.2500 -113.7400       9.4       179       109        60
OIR    2025250     91400   19.2500 -113.7500       9.4       180       109        60
OIR    2025250     91400   19.2500 -113.7600       9.4       180       110        60
OIR    2025250     91400   19.2500 -113.7700       9.4       180       110        60
OIR    2025250     91400   19.2500 -113.7800       9.5       180       109        60
OIR    2025250     91400   19.2500 -113.7900       9.5       180       109        60
OIR    2025250     91400   19.2500 -113.8000       9.5       180       109        60
OIR    2025250     91400   19.2500 -113.8100       9.6       180       109        60
OIR    2025250     91400   19.2500 -113.8200       9.6       181       110        60
OIR    2025250     91400   19.2500 -113.8300       9.6       181       111        60
OIR    2025250     91400   19.2500 -113.8400       9.7       181       111        60
OIR    2025250     91400   19.2500 -113.8500       9.7       181       111        60
OIR    2025250     91400   19.2500 -113.8600       9.8       182       111        60
OIR    2025250     91400   19.2500 -113.8700       9.8       182       110        60
OIR    2025250     91400   19.2500 -113.8800       9.9       182       110        60
OIR    2025250     91400   19.2500 -113.8900      10.0       183       110        60
OIR    2025250     91400   19.2500 -113.9000      10.0       183       110        60
OIR    2025250     91400   19.2500 -113.9100      10.1       183       111        60
OIR    2025250     91400   19.2500 -113.9200      10.1       184       112        60
OIR    2025250     91400   19.2500 -113.9300      10.2       184       112        60
OIR    2025250     91400   19.2500 -113.9400      10.2       184       111        60
OIR    2025250     91400   19.2500 -113.9500      10.2       185       110        60
OIR    2025250     91400   19.2500 -113.9600      10.3       185       110        60
OIR    2025250     91400   19.2500 -113.9700      10.3       185       110        60
OIR    2025250     91400   19.2500 -113.9800      10.3       185       111        60
OIR    2025250     91400   19.2500 -113.9900      10.3       185       111        60
OIR    2025250     91400   19.2500 -114.0000      10.3       185       112        60
OIR    2025250     91400   19.2500 -114.0100      10.3       185       112        60
OIR    2025250     91400   19.2500 -114.0200      10.3       186       113        60
OIR    2025250     91400   19.2500 -114.0300      10.3       186       112        60
OIR    2025250     91400   19.2500 -114.0400      10.3       186       111        60
OIR    2025250     91400   19.2500 -114.0500      10.4       186       112        60
OIR    2025250     91400   19.2500 -114.0600      10.4       186       113        60
OIR    2025250     91400   19.2500 -114.0700      10.4       186       114        60
OIR    2025250     91400   19.2500 -114.0800      10.4       186       115        60
OIR    2025250     91400   19.2500 -114.0900      10.4       186       116        60
OIR    2025250     91400   19.2500 -114.1000      10.4       186       116        60
OIR    2025250     91400   19.2500 -114.1100      10.5       186       116        60
OIR    2025250     91400   19.2500 -114.1200      10.5       187       116        60
OIR    2025250     91400   19.2500 -114.1300      10.5       187       115        60
OIR    2025250     91400   19.2500 -114.1400      10.5       187       116        60
OIR    2025250     91400   19.2500 -114.1500      10.5       187       116        60
OIR    2025250     91400   19.2500 -114.1600      10.5       187       117        60
OIR    2025250     91400   19.2500 -114.1700      10.5       187       119        60
OIR    2025250     91400   19.2500 -114.1800      10.5       187       120        60
OIR    2025250     91400   19.2500 -114.1900      10.5       187       120        60
OIR    2025250     91400   19.2500 -114.2000      10.5       187       120        60
OIR    2025250     91400   19.2500 -114.2100      10.5       187       121        60
OIR    2025250     91400   19.2500 -114.2200      10.5       187       122        60
OIR    2025250     91400   19.2500 -114.2300      10.5       188       122        60
OIR    2025250     91400   19.2500 -114.2400      10.5       188       122        60
OIR    2025250     91400   19.2500 -114.2500      10.5       188       122        60
OIR    2025250     91400   19.2500 -114.2600      10.5       188       122        60
OIR    2025250     91400   19.2500 -114.2700      10.5       188       122        60
OIR    2025250     91400   19.2500 -114.2800      10.5       188       122        60
OIR    2025250     91400   19.2500 -114.2900      10.5       188       122        60
OIR    2025250     91400   19.2500 -114.3000      10.5       188       125        60
OIR    2025250     91400   19.2500 -114.3100      10.4       188       129        60
OIR    2025250     91400   19.2500 -114.3200      10.4       188       131        60
OIR    2025250     91400   19.2500 -114.3300      10.4       188       132        60
OIR    2025250     91400   19.2500 -114.3400      10.5       188       134        60
OIR    2025250     91400   19.2500 -114.3500      10.5       188       136        60
OIR    2025250     91400   19.2500 -114.3600      10.5       188       138        60
OIR    2025250     91400   19.2500 -114.3700      10.5       188       135        60
OIR    2025250     91400   19.2500 -114.3800      10.6       188       131        60
OIR    2025250     91400   19.2500 -114.3900      10.6       188       133        60
OIR    2025250     91400   19.2500 -114.4000      10.6       188       137        60
OIR    2025250     91400   19.2500 -114.4100      10.6       187       137        60
OIR    2025250     91400   19.2500 -114.4200      10.6       187       133        60
OIR    2025250     91400   19.2500 -114.4300      10.6       187       131        60
OIR    2025250     91400   19.2500 -114.4400      10.6       187       134        60
OIR    2025250     91400   19.2500 -114.4500      10.6       187       136        60
OIR    2025250     91400   19.2500 -114.4600      10.6       187       133        60
OIR    2025250     91400   19.2500 -114.4700      10.6       187       130        60
OIR    2025250     91400   19.2500 -114.4800      10.6       187       130        60
OIR    2025250     91400   19.2500 -114.4900      10.6       187       131        60
OIR    2025250     91400   19.2500 -114.5000      10.6       187       134        60
OIR    2025250     91400   19.2500 -114.5100      10.5       187       140        60
OIR    2025250     91400   19.2500 -116.1000       6.5       172       141        60
OIR    2025250     91400   19.2500 -116.1100       6.6       172       137        60
OIR    2025250     91400   19.2500 -116.1200       6.6       171       136        60
OIR    2025250     91400   19.2500 -116.1300       6.7       171       136        60
OIR    2025250     91400   19.2500 -116.1400       6.7       171       135        60
OIR    2025250     91400   19.2500 -116.1500       6.7       170       134        60
OIR    2025250     91400   19.2500 -116.1600       6.7       169       133        60
OIR    2025250     91400   19.2500 -116.1700       6.7       169       134        60
OIR    2025250     91400   19.2500 -116.1800       6.6       167       135        60
OIR    2025250     91400   19.2500 -116.1900       6.6       166       134        60
OIR    2025250     91400   19.2500 -116.2000       6.5       165       134        60
OIR    2025250     91400   19.2500 -116.2100       6.3       164       135        60
OIR    2025250     91400   19.2500 -116.2200       6.0       164       136        60
OIR    2025250     91400   19.2500 -116.2300       5.8       162       137        60
OIR    2025250     91400   19.2500 -116.2400       5.5       160       139        60
OIR    2025250     91400   19.2500 -116.2500       5.1       157       140        60
OIR    2025250     91400   19.2500 -116.2600       4.8       156       141        60
OIR    2025250     91400   19.2400 -111.0100       7.0        56       138        60
OIR    2025250     91400   19.2400 -111.0200       7.1        56       142        60
OIR    2025250     91400   19.2400 -111.4700       9.7        51       142        60
OIR    2025250     91400   19.2400 -111.4800       9.9        52       140        60
OIR    2025250     91400   19.2400 -111.4900      10.2        53       139        60
OIR    2025250     91400   19.2400 -111.5000      10.3        54       139        60
OIR    2025250     91400   19.2400 -111.5100      10.5        56       138        60
OIR    2025250     91400   19.2400 -111.5200      10.5        59       138        60
OIR    2025250     91400   19.2400 -111.5300      10.4        62       137        60
OIR    2025250     91400   19.2400 -111.5400      10.4        63       138        60
OIR    2025250     91400   19.2400 -111.5500      10.4        64       140        60
OIR    2025250     91400   19.2400 -111.5600      10.4        65       141        60
OIR    2025250     91400   19.2400 -111.5700      10.4        65       141        60
OIR    2025250     91400   19.2400 -111.5800      10.4        66       141        60
OIR    2025250     91400   19.2400 -112.8600       8.9       156       141        60
OIR    2025250     91400   19.2400 -112.8700       8.6       157       138        60
OIR    2025250     91400   19.2400 -112.8800       8.3       157       137        60
OIR    2025250     91400   19.2400 -112.8900       8.2       157       136        60
OIR    2025250     91400   19.2400 -112.9000       8.2       159       138        60
OIR    2025250     91400   19.2400 -112.9100       8.1       162       141        60
OIR    2025250     91400   19.2400 -112.9300       8.0       168       140        60
OIR    2025250     91400   19.2400 -112.9400       7.9       169       139        60
OIR    2025250     91400   19.2400 -112.9500       7.9       171       139        60
OIR    2025250     91400   19.2400 -112.9600       7.9       172       138        60
OIR    2025250     91400   19.2400 -112.9700       7.9       173       135        60
OIR    2025250     91400   19.2400 -112.9800       7.9       173       133        60
OIR    2025250     91400   19.2400 -112.9900       7.9       174       131        60
OIR    2025250     91400   19.2400 -113.0000       7.9       174       129        60
OIR    2025250     91400   19.2400 -113.0100       7.9       174       129        60
OIR    2025250     91400   19.2400 -113.0200       7.9       174       132        60
OIR    2025250     91400   19.2400 -113.0300       7.9       174       136        60
OIR    2025250     91400   19.2400 -113.0400       7.9       175       134        60
OIR    2025250     91400   19.2400 -113.0500       7.9       175       133        60
OIR    2025250     91400   19.2400 -113.0600       7.9       175       130        60
OIR    2025250     91400   19.2400 -113.0700       7.9       175       128        60
OIR    2025250     91400   19.2400 -113.0800       7.9       175       126        60
OIR    2025250     91400   19.2400 -113.0900       7.9       175       125        60
OIR    2025250     91400   19.2400 -113.1000       7.9       175       125        60
OIR    2025250     91400   19.2400 -113.1100       7.9       175       122        60
OIR    2025250     91400   19.2400 -113.1200       7.9       175       120        60
OIR    2025250     91400   19.2400 -113.1300       7.9       176       119        60
OIR    2025250     91400   19.2400 -113.1400       7.9       176       117        60
OIR    2025250     91400   19.2400 -113.1500       7.9       175       116        60
OIR    2025250     91400   19.2400 -113.1600       7.9       176       116        60
OIR    2025250     91400   19.2400 -113.1700       7.9       176       116        60
OIR    2025250     91400   19.2400 -113.1800       7.9       176       116        60
OIR    2025250     91400   19.2400 -113.1900       7.9       176       116        60
OIR    2025250     91400   19.2400 -113.2000       8.0       176       115        60
OIR    2025250     91400   19.2400 -113.2100       8.0       176       114        60
OIR    2025250     91400   19.2400 -113.2200       8.0       176       113        60
OIR    2025250     91400   19.2400 -113.2300       8.0       176       110        60
OIR    2025250     91400   19.2400 -113.2400       8.0       176       109        60
OIR    2025250     91400   19.2400 -113.2500       8.0       176       109        60
OIR    2025250     91400   19.2400 -113.2600       8.0       176       109        60
OIR    2025250     91400   19.2400 -113.2700       8.0       176       108        60
OIR    2025250     91400   19.2400 -113.2800       8.0       176       107        60
OIR    2025250     91400   19.2400 -113.2900       8.1       176       107        60
OIR    2025250     91400   19.2400 -113.3000       8.1       176       105        60
OIR    2025250     91400   19.2400 -113.3100       8.1       176       105        60
OIR    2025250     91400   19.2400 -113.3200       8.1       176       105        60
OIR    2025250     91400   19.2400 -113.3300       8.1       176       104        60
OIR    2025250     91400   19.2400 -113.3400       8.2       176       104        60
OIR    2025250     91400   19.2400 -113.3500       8.2       176       104        60
OIR    2025250     91400   19.2400 -113.3600       8.2       176       104        60
OIR    2025250     91400   19.2400 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.2400 -113.3800       8.3       176       104        60
OIR    2025250     91400   19.2400 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.2400 -113.4000       8.3       176       103        60
OIR    2025250     91400   19.2400 -113.4100       8.3       176       103        60
OIR    2025250     91400   19.2400 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.2400 -113.4300       8.4       176       104        60
OIR    2025250     91400   19.2400 -113.4400       8.5       176       103        60
OIR    2025250     91400   19.2400 -113.4500       8.5       176       103        60
OIR    2025250     91400   19.2400 -113.4600       8.5       176       104        60
OIR    2025250     91400   19.2400 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.2400 -113.4800       8.6       176       104        60
OIR    2025250     91400   19.2400 -113.4900       8.6       176       104        60
OIR    2025250     91400   19.2400 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.2400 -113.5100       8.7       176       104        60
OIR    2025250     91400   19.2400 -113.5200       8.7       176       104        60
OIR    2025250     91400   19.2400 -113.5300       8.7       176       104        60
OIR    2025250     91400   19.2400 -113.5400       8.8       176       104        60
OIR    2025250     91400   19.2400 -113.5500       8.8       177       105        60
OIR    2025250     91400   19.2400 -113.5600       8.8       177       107        60
OIR    2025250     91400   19.2400 -113.5700       8.9       177       105        60
OIR    2025250     91400   19.2400 -113.5800       8.9       177       105        60
OIR    2025250     91400   19.2400 -113.5900       8.9       177       105        60
OIR    2025250     91400   19.2400 -113.6000       8.9       177       107        60
OIR    2025250     91400   19.2400 -113.6100       9.0       177       108        60
OIR    2025250     91400   19.2400 -113.6200       9.0       177       109        60
OIR    2025250     91400   19.2400 -113.6300       9.0       177       109        60
OIR    2025250     91400   19.2400 -113.6400       9.0       177       110        60
OIR    2025250     91400   19.2400 -113.6500       9.1       178       110        60
OIR    2025250     91400   19.2400 -113.6600       9.1       178       111        60
OIR    2025250     91400   19.2400 -113.6700       9.1       178       111        60
OIR    2025250     91400   19.2400 -113.6800       9.1       178       111        60
OIR    2025250     91400   19.2400 -113.6900       9.2       178       111        60
OIR    2025250     91400   19.2400 -113.7000       9.3       179       111        60
OIR    2025250     91400   19.2400 -113.7100       9.3       179       111        60
OIR    2025250     91400   19.2400 -113.7200       9.3       179       111        60
OIR    2025250     91400   19.2400 -113.7300       9.4       179       111        60
OIR    2025250     91400   19.2400 -113.7400       9.4       179       111        60
OIR    2025250     91400   19.2400 -113.7500       9.4       180       111        60
OIR    2025250     91400   19.2400 -113.7600       9.4       180       111        60
OIR    2025250     91400   19.2400 -113.7700       9.5       180       111        60
OIR    2025250     91400   19.2400 -113.7800       9.5       180       110        60
OIR    2025250     91400   19.2400 -113.7900       9.5       180       109        60
OIR    2025250     91400   19.2400 -113.8000       9.6       180       109        60
OIR    2025250     91400   19.2400 -113.8100       9.6       181       109        60
OIR    2025250     91400   19.2400 -113.8200       9.6       181       109        60
OIR    2025250     91400   19.2400 -113.8300       9.7       181       110        60
OIR    2025250     91400   19.2400 -113.8400       9.7       181       110        60
OIR    2025250     91400   19.2400 -113.8500       9.8       182       110        60
OIR    2025250     91400   19.2400 -113.8600       9.8       182       110        60
OIR    2025250     91400   19.2400 -113.8700       9.9       182       110        60
OIR    2025250     91400   19.2400 -113.8800      10.0       182       110        60
OIR    2025250     91400   19.2400 -113.8900      10.0       183       110        60
OIR    2025250     91400   19.2400 -113.9000      10.1       183       110        60
OIR    2025250     91400   19.2400 -113.9100      10.1       184       110        60
OIR    2025250     91400   19.2400 -113.9200      10.2       184       111        60
OIR    2025250     91400   19.2400 -113.9300      10.2       184       112        60
OIR    2025250     91400   19.2400 -113.9400      10.3       185       112        60
OIR    2025250     91400   19.2400 -113.9500      10.3       185       111        60
OIR    2025250     91400   19.2400 -113.9600      10.3       185       111        60
OIR    2025250     91400   19.2400 -113.9700      10.4       185       111        60
OIR    2025250     91400   19.2400 -113.9800      10.4       185       112        60
OIR    2025250     91400   19.2400 -113.9900      10.4       185       112        60
OIR    2025250     91400   19.2400 -114.0000      10.4       185       112        60
OIR    2025250     91400   19.2400 -114.0100      10.4       186       112        60
OIR    2025250     91400   19.2400 -114.0200      10.4       186       112        60
OIR    2025250     91400   19.2400 -114.0300      10.4       186       112        60
OIR    2025250     91400   19.2400 -114.0400      10.4       186       111        60
OIR    2025250     91400   19.2400 -114.0500      10.4       186       112        60
OIR    2025250     91400   19.2400 -114.0600      10.4       186       113        60
OIR    2025250     91400   19.2400 -114.0700      10.4       186       114        60
OIR    2025250     91400   19.2400 -114.0800      10.4       186       115        60
OIR    2025250     91400   19.2400 -114.0900      10.4       186       116        60
OIR    2025250     91400   19.2400 -114.1000      10.5       186       116        60
OIR    2025250     91400   19.2400 -114.1100      10.5       186       116        60
OIR    2025250     91400   19.2400 -114.1200      10.5       187       115        60
OIR    2025250     91400   19.2400 -114.1300      10.5       187       114        60
OIR    2025250     91400   19.2400 -114.1400      10.5       187       115        60
OIR    2025250     91400   19.2400 -114.1500      10.5       187       116        60
OIR    2025250     91400   19.2400 -114.1600      10.5       187       119        60
OIR    2025250     91400   19.2400 -114.1700      10.5       187       119        60
OIR    2025250     91400   19.2400 -114.1800      10.5       187       120        60
OIR    2025250     91400   19.2400 -114.1900      10.5       187       120        60
OIR    2025250     91400   19.2400 -114.2000      10.5       187       121        60
OIR    2025250     91400   19.2400 -114.2100      10.5       187       121        60
OIR    2025250     91400   19.2400 -114.2200      10.5       187       122        60
OIR    2025250     91400   19.2400 -114.2300      10.5       188       123        60
OIR    2025250     91400   19.2400 -114.2400      10.5       188       125        60
OIR    2025250     91400   19.2400 -114.2500      10.5       188       125        60
OIR    2025250     91400   19.2400 -114.2600      10.5       188       123        60
OIR    2025250     91400   19.2400 -114.2700      10.5       188       122        60
OIR    2025250     91400   19.2400 -114.2800      10.5       188       122        60
OIR    2025250     91400   19.2400 -114.2900      10.5       188       123        60
OIR    2025250     91400   19.2400 -114.3000      10.5       188       127        60
OIR    2025250     91400   19.2400 -114.3100      10.5       188       132        60
OIR    2025250     91400   19.2400 -114.3200      10.5       188       136        60
OIR    2025250     91400   19.2400 -114.3300      10.5       188       137        60
OIR    2025250     91400   19.2400 -114.3400      10.5       188       138        60
OIR    2025250     91400   19.2400 -114.3500      10.5       188       140        60
OIR    2025250     91400   19.2400 -114.3700      10.6       188       138        60
OIR    2025250     91400   19.2400 -114.3800      10.6       188       136        60
OIR    2025250     91400   19.2400 -114.3900      10.6       188       136        60
OIR    2025250     91400   19.2400 -114.4000      10.6       187       137        60
OIR    2025250     91400   19.2400 -114.4100      10.7       187       139        60
OIR    2025250     91400   19.2400 -114.4200      10.7       187       137        60
OIR    2025250     91400   19.2400 -114.4300      10.7       187       135        60
OIR    2025250     91400   19.2400 -114.4400      10.7       187       137        60
OIR    2025250     91400   19.2400 -114.4500      10.7       187       138        60
OIR    2025250     91400   19.2400 -114.4600      10.7       187       137        60
OIR    2025250     91400   19.2400 -114.4700      10.6       187       136        60
OIR    2025250     91400   19.2400 -114.4800      10.6       187       135        60
OIR    2025250     91400   19.2400 -114.4900      10.6       187       135        60
OIR    2025250     91400   19.2400 -114.5000      10.6       187       136        60
OIR    2025250     91400   19.2400 -114.5100      10.6       187       140        60
OIR    2025250     91400   19.2400 -116.0900       6.5       172       142        60
OIR    2025250     91400   19.2400 -116.1000       6.5       172       140        60
OIR    2025250     91400   19.2400 -116.1100       6.6       171       138        60
OIR    2025250     91400   19.2400 -116.1200       6.6       171       136        60
OIR    2025250     91400   19.2400 -116.1300       6.6       171       135        60
OIR    2025250     91400   19.2400 -116.1400       6.7       171       134        60
OIR    2025250     91400   19.2400 -116.1500       6.7       170       133        60
OIR    2025250     91400   19.2400 -116.1600       6.7       170       133        60
OIR    2025250     91400   19.2400 -116.1700       6.6       170       133        60
OIR    2025250     91400   19.2400 -116.1800       6.6       169       134        60
OIR    2025250     91400   19.2400 -116.1900       6.5       168       134        60
OIR    2025250     91400   19.2400 -116.2000       6.3       167       134        60
OIR    2025250     91400   19.2400 -116.2100       6.1       166       135        60
OIR    2025250     91400   19.2400 -116.2200       5.8       165       136        60
OIR    2025250     91400   19.2400 -116.2300       5.6       163       137        60
OIR    2025250     91400   19.2400 -116.2400       5.3       161       138        60
OIR    2025250     91400   19.2400 -116.2500       4.9       158       138        60
OIR    2025250     91400   19.2400 -116.2600       4.7       157       139        60
OIR    2025250     91400   19.2400 -116.2700       4.6       156       141        60
OIR    2025250     91400   19.2300 -111.0100       6.7        58       140        60
OIR    2025250     91400   19.2300 -111.0200       7.1        56       140        60
OIR    2025250     91400   19.2300 -111.5000      10.1        55       141        60
OIR    2025250     91400   19.2300 -111.5100      10.3        58       140        60
OIR    2025250     91400   19.2300 -111.5200      10.3        60       140        60
OIR    2025250     91400   19.2300 -111.5300      10.3        62       140        60
OIR    2025250     91400   19.2300 -111.5400      10.4        63       140        60
OIR    2025250     91400   19.2300 -111.5500      10.4        64       139        60
OIR    2025250     91400   19.2300 -111.5600      10.4        65       139        60
OIR    2025250     91400   19.2300 -111.5700      10.4        65       140        60
OIR    2025250     91400   19.2300 -111.5800      10.4        65       140        60
OIR    2025250     91400   19.2300 -112.8700       8.4       155       141        60
OIR    2025250     91400   19.2300 -112.8800       8.3       156       139        60
OIR    2025250     91400   19.2300 -112.8900       8.2       157       138        60
OIR    2025250     91400   19.2300 -112.9000       8.2       158       139        60
OIR    2025250     91400   19.2300 -112.9100       8.0       160       141        60
OIR    2025250     91400   19.2300 -112.9300       8.0       166       139        60
OIR    2025250     91400   19.2300 -112.9400       8.0       168       135        60
OIR    2025250     91400   19.2300 -112.9500       7.9       170       136        60
OIR    2025250     91400   19.2300 -112.9600       7.9       172       136        60
OIR    2025250     91400   19.2300 -112.9700       7.9       172       135        60
OIR    2025250     91400   19.2300 -112.9800       7.9       173       135        60
OIR    2025250     91400   19.2300 -112.9900       7.9       174       133        60
OIR    2025250     91400   19.2300 -113.0000       7.9       174       131        60
OIR    2025250     91400   19.2300 -113.0100       7.9       174       129        60
OIR    2025250     91400   19.2300 -113.0200       7.9       174       131        60
OIR    2025250     91400   19.2300 -113.0300       7.9       174       133        60
OIR    2025250     91400   19.2300 -113.0400       7.9       174       134        60
OIR    2025250     91400   19.2300 -113.0500       7.9       175       133        60
OIR    2025250     91400   19.2300 -113.0600       7.9       175       131        60
OIR    2025250     91400   19.2300 -113.0700       7.9       175       128        60
OIR    2025250     91400   19.2300 -113.0800       7.9       175       126        60
OIR    2025250     91400   19.2300 -113.0900       7.9       175       126        60
OIR    2025250     91400   19.2300 -113.1000       7.9       175       126        60
OIR    2025250     91400   19.2300 -113.1100       7.9       175       124        60
OIR    2025250     91400   19.2300 -113.1200       7.9       175       121        60
OIR    2025250     91400   19.2300 -113.1300       7.9       175       119        60
OIR    2025250     91400   19.2300 -113.1400       7.9       175       117        60
OIR    2025250     91400   19.2300 -113.1500       7.9       175       116        60
OIR    2025250     91400   19.2300 -113.1600       7.9       176       116        60
OIR    2025250     91400   19.2300 -113.1700       7.9       176       116        60
OIR    2025250     91400   19.2300 -113.1800       7.9       176       116        60
OIR    2025250     91400   19.2300 -113.1900       7.9       176       116        60
OIR    2025250     91400   19.2300 -113.2000       8.0       176       116        60
OIR    2025250     91400   19.2300 -113.2100       8.0       176       116        60
OIR    2025250     91400   19.2300 -113.2200       8.0       176       114        60
OIR    2025250     91400   19.2300 -113.2300       8.0       176       112        60
OIR    2025250     91400   19.2300 -113.2400       8.0       176       109        60
OIR    2025250     91400   19.2300 -113.2500       8.0       176       109        60
OIR    2025250     91400   19.2300 -113.2600       8.0       176       110        60
OIR    2025250     91400   19.2300 -113.2700       8.0       176       109        60
OIR    2025250     91400   19.2300 -113.2800       8.0       176       108        60
OIR    2025250     91400   19.2300 -113.2900       8.1       176       107        60
OIR    2025250     91400   19.2300 -113.3000       8.1       176       105        60
OIR    2025250     91400   19.2300 -113.3100       8.1       176       105        60
OIR    2025250     91400   19.2300 -113.3200       8.1       176       105        60
OIR    2025250     91400   19.2300 -113.3300       8.2       176       105        60
OIR    2025250     91400   19.2300 -113.3400       8.2       176       105        60
OIR    2025250     91400   19.2300 -113.3500       8.2       176       104        60
OIR    2025250     91400   19.2300 -113.3600       8.2       176       104        60
OIR    2025250     91400   19.2300 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.2300 -113.3800       8.3       176       104        60
OIR    2025250     91400   19.2300 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.2300 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.2300 -113.4100       8.3       176       104        60
OIR    2025250     91400   19.2300 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.2300 -113.4300       8.5       176       104        60
OIR    2025250     91400   19.2300 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.2300 -113.4500       8.5       176       104        60
OIR    2025250     91400   19.2300 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.2300 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.2300 -113.4800       8.6       176       104        60
OIR    2025250     91400   19.2300 -113.4900       8.6       176       104        60
OIR    2025250     91400   19.2300 -113.5000       8.6       176       104        60
OIR    2025250     91400   19.2300 -113.5100       8.7       176       104        60
OIR    2025250     91400   19.2300 -113.5200       8.7       176       104        60
OIR    2025250     91400   19.2300 -113.5300       8.7       176       104        60
OIR    2025250     91400   19.2300 -113.5400       8.8       176       105        60
OIR    2025250     91400   19.2300 -113.5500       8.8       177       105        60
OIR    2025250     91400   19.2300 -113.5600       8.8       177       107        60
OIR    2025250     91400   19.2300 -113.5700       8.9       177       107        60
OIR    2025250     91400   19.2300 -113.5800       8.9       177       107        60
OIR    2025250     91400   19.2300 -113.5900       8.9       177       107        60
OIR    2025250     91400   19.2300 -113.6000       8.9       177       108        60
OIR    2025250     91400   19.2300 -113.6100       9.0       177       108        60
OIR    2025250     91400   19.2300 -113.6200       9.0       177       109        60
OIR    2025250     91400   19.2300 -113.6300       9.0       177       109        60
OIR    2025250     91400   19.2300 -113.6400       9.0       177       110        60
OIR    2025250     91400   19.2300 -113.6500       9.1       178       111        60
OIR    2025250     91400   19.2300 -113.6600       9.1       178       111        60
OIR    2025250     91400   19.2300 -113.6700       9.1       178       111        60
OIR    2025250     91400   19.2300 -113.6800       9.1       178       111        60
OIR    2025250     91400   19.2300 -113.6900       9.2       178       111        60
OIR    2025250     91400   19.2300 -113.7000       9.3       179       112        60
OIR    2025250     91400   19.2300 -113.7100       9.3       179       111        60
OIR    2025250     91400   19.2300 -113.7200       9.4       179       111        60
OIR    2025250     91400   19.2300 -113.7300       9.4       179       111        60
OIR    2025250     91400   19.2300 -113.7400       9.4       180       111        60
OIR    2025250     91400   19.2300 -113.7500       9.4       180       111        60
OIR    2025250     91400   19.2300 -113.7600       9.5       180       111        60
OIR    2025250     91400   19.2300 -113.7700       9.5       180       112        60
OIR    2025250     91400   19.2300 -113.7800       9.5       180       111        60
OIR    2025250     91400   19.2300 -113.7900       9.6       180       110        60
OIR    2025250     91400   19.2300 -113.8000       9.6       180       109        60
OIR    2025250     91400   19.2300 -113.8100       9.7       181       109        60
OIR    2025250     91400   19.2300 -113.8200       9.7       181       108        60
OIR    2025250     91400   19.2300 -113.8300       9.7       181       109        60
OIR    2025250     91400   19.2300 -113.8400       9.8       181       110        60
OIR    2025250     91400   19.2300 -113.8500       9.8       182       110        60
OIR    2025250     91400   19.2300 -113.8600       9.9       182       110        60
OIR    2025250     91400   19.2300 -113.8700      10.0       182       110        60
OIR    2025250     91400   19.2300 -113.8800      10.0       183       110        60
OIR    2025250     91400   19.2300 -113.8900      10.1       183       110        60
OIR    2025250     91400   19.2300 -113.9000      10.2       183       110        60
OIR    2025250     91400   19.2300 -113.9100      10.2       184       110        60
OIR    2025250     91400   19.2300 -113.9200      10.2       184       111        60
OIR    2025250     91400   19.2300 -113.9300      10.3       184       111        60
OIR    2025250     91400   19.2300 -113.9400      10.3       185       112        60
OIR    2025250     91400   19.2300 -113.9500      10.3       185       112        60
OIR    2025250     91400   19.2300 -113.9600      10.4       185       113        60
OIR    2025250     91400   19.2300 -113.9700      10.4       185       113        60
OIR    2025250     91400   19.2300 -113.9800      10.4       185       113        60
OIR    2025250     91400   19.2300 -113.9900      10.4       185       113        60
OIR    2025250     91400   19.2300 -114.0000      10.4       186       112        60
OIR    2025250     91400   19.2300 -114.0100      10.4       186       111        60
OIR    2025250     91400   19.2300 -114.0200      10.4       186       110        60
OIR    2025250     91400   19.2300 -114.0300      10.4       186       111        60
OIR    2025250     91400   19.2300 -114.0400      10.4       186       112        60
OIR    2025250     91400   19.2300 -114.0500      10.4       186       113        60
OIR    2025250     91400   19.2300 -114.0600      10.4       186       114        60
OIR    2025250     91400   19.2300 -114.0700      10.4       186       116        60
OIR    2025250     91400   19.2300 -114.0800      10.5       186       116        60
OIR    2025250     91400   19.2300 -114.0900      10.5       186       116        60
OIR    2025250     91400   19.2300 -114.1000      10.5       186       116        60
OIR    2025250     91400   19.2300 -114.1100      10.5       187       116        60
OIR    2025250     91400   19.2300 -114.1200      10.5       187       116        60
OIR    2025250     91400   19.2300 -114.1300      10.5       187       115        60
OIR    2025250     91400   19.2300 -114.1400      10.5       187       115        60
OIR    2025250     91400   19.2300 -114.1500      10.5       187       116        60
OIR    2025250     91400   19.2300 -114.1600      10.5       187       117        60
OIR    2025250     91400   19.2300 -114.1700      10.5       187       119        60
OIR    2025250     91400   19.2300 -114.1800      10.5       187       120        60
OIR    2025250     91400   19.2300 -114.1900      10.5       187       121        60
OIR    2025250     91400   19.2300 -114.2000      10.5       187       122        60
OIR    2025250     91400   19.2300 -114.2100      10.5       187       123        60
OIR    2025250     91400   19.2300 -114.2200      10.5       187       124        60
OIR    2025250     91400   19.2300 -114.2300      10.5       188       125        60
OIR    2025250     91400   19.2300 -114.2400      10.5       188       126        60
OIR    2025250     91400   19.2300 -114.2500      10.5       188       126        60
OIR    2025250     91400   19.2300 -114.2600      10.5       188       126        60
OIR    2025250     91400   19.2300 -114.2700      10.5       188       126        60
OIR    2025250     91400   19.2300 -114.2800      10.5       188       125        60
OIR    2025250     91400   19.2300 -114.2900      10.5       188       125        60
OIR    2025250     91400   19.2300 -114.3000      10.5       188       126        60
OIR    2025250     91400   19.2300 -114.3100      10.5       188       131        60
OIR    2025250     91400   19.2300 -114.3200      10.5       188       136        60
OIR    2025250     91400   19.2300 -114.3300      10.5       188       137        60
OIR    2025250     91400   19.2300 -114.3400      10.6       188       138        60
OIR    2025250     91400   19.2300 -114.3500      10.6       188       140        60
OIR    2025250     91400   19.2300 -114.3700      10.6       188       140        60
OIR    2025250     91400   19.2300 -114.3800      10.6       188       136        60
OIR    2025250     91400   19.2300 -114.3900      10.7       188       136        60
OIR    2025250     91400   19.2300 -114.4000      10.7       187       138        60
OIR    2025250     91400   19.2300 -114.4100      10.7       187       139        60
OIR    2025250     91400   19.2300 -114.4200      10.7       187       139        60
OIR    2025250     91400   19.2300 -114.4300      10.7       187       140        60
OIR    2025250     91400   19.2300 -114.4400      10.7       187       140        60
OIR    2025250     91400   19.2300 -114.4500      10.7       187       141        60
OIR    2025250     91400   19.2300 -114.4600      10.7       187       140        60
OIR    2025250     91400   19.2300 -114.4700      10.7       187       139        60
OIR    2025250     91400   19.2300 -114.4800      10.7       187       138        60
OIR    2025250     91400   19.2300 -114.4900      10.6       187       137        60
OIR    2025250     91400   19.2300 -114.5000      10.6       187       138        60
OIR    2025250     91400   19.2300 -114.5100      10.6       187       139        60
OIR    2025250     91400   19.2300 -116.0800       6.3       173       142        60
OIR    2025250     91400   19.2300 -116.0900       6.5       172       141        60
OIR    2025250     91400   19.2300 -116.1000       6.5       171       139        60
OIR    2025250     91400   19.2300 -116.1100       6.6       171       138        60
OIR    2025250     91400   19.2300 -116.1200       6.6       171       136        60
OIR    2025250     91400   19.2300 -116.1300       6.6       171       135        60
OIR    2025250     91400   19.2300 -116.1400       6.6       171       133        60
OIR    2025250     91400   19.2300 -116.1500       6.6       171       133        60
OIR    2025250     91400   19.2300 -116.1600       6.6       170       133        60
OIR    2025250     91400   19.2300 -116.1700       6.6       170       134        60
OIR    2025250     91400   19.2300 -116.1800       6.6       170       134        60
OIR    2025250     91400   19.2300 -116.1900       6.5       169       134        60
OIR    2025250     91400   19.2300 -116.2000       6.3       168       134        60
OIR    2025250     91400   19.2300 -116.2100       6.0       167       134        60
OIR    2025250     91400   19.2300 -116.2200       5.7       166       135        60
OIR    2025250     91400   19.2300 -116.2300       5.5       164       136        60
OIR    2025250     91400   19.2300 -116.2400       5.1       162       137        60
OIR    2025250     91400   19.2300 -116.2500       4.8       160       137        60
OIR    2025250     91400   19.2300 -116.2600       4.6       158       138        60
OIR    2025250     91400   19.2300 -116.2700       4.5       158       139        60
OIR    2025250     91400   19.2300 -116.2800       4.4       157       142        60
OIR    2025250     91400   19.2200 -111.0200       6.8        56       139        60
OIR    2025250     91400   19.2200 -111.0300       7.4        54       140        60
OIR    2025250     91400   19.2200 -111.0400       7.5        54       140        60
OIR    2025250     91400   19.2200 -111.5100      10.1        58       141        60
OIR    2025250     91400   19.2200 -111.5200      10.2        60       140        60
OIR    2025250     91400   19.2200 -111.5300      10.3        62       141        60
OIR    2025250     91400   19.2200 -111.5400      10.3        64       141        60
OIR    2025250     91400   19.2200 -111.5500      10.3        65       140        60
OIR    2025250     91400   19.2200 -111.5600      10.4        65       138        60
OIR    2025250     91400   19.2200 -111.5700      10.4        65       139        60
OIR    2025250     91400   19.2200 -111.5800      10.4        65       139        60
OIR    2025250     91400   19.2200 -112.8800       8.2       155       142        60
OIR    2025250     91400   19.2200 -112.8900       8.2       156       141        60
OIR    2025250     91400   19.2200 -112.9000       8.2       157       141        60
OIR    2025250     91400   19.2200 -112.9100       8.1       158       142        60
OIR    2025250     91400   19.2200 -112.9200       8.1       161       142        60
OIR    2025250     91400   19.2200 -112.9300       8.0       165       138        60
OIR    2025250     91400   19.2200 -112.9400       8.0       168       133        60
OIR    2025250     91400   19.2200 -112.9500       7.9       170       132        60
OIR    2025250     91400   19.2200 -112.9600       7.9       171       132        60
OIR    2025250     91400   19.2200 -112.9700       7.9       172       134        60
OIR    2025250     91400   19.2200 -112.9800       7.9       173       136        60
OIR    2025250     91400   19.2200 -112.9900       7.9       174       137        60
OIR    2025250     91400   19.2200 -113.0000       7.9       174       134        60
OIR    2025250     91400   19.2200 -113.0100       7.9       174       130        60
OIR    2025250     91400   19.2200 -113.0200       7.9       174       129        60
OIR    2025250     91400   19.2200 -113.0300       7.9       174       130        60
OIR    2025250     91400   19.2200 -113.0400       7.9       174       130        60
OIR    2025250     91400   19.2200 -113.0500       7.9       175       129        60
OIR    2025250     91400   19.2200 -113.0600       7.9       175       128        60
OIR    2025250     91400   19.2200 -113.0700       7.9       175       126        60
OIR    2025250     91400   19.2200 -113.0800       7.9       175       125        60
OIR    2025250     91400   19.2200 -113.0900       7.9       175       127        60
OIR    2025250     91400   19.2200 -113.1000       7.9       175       129        60
OIR    2025250     91400   19.2200 -113.1100       7.9       175       128        60
OIR    2025250     91400   19.2200 -113.1200       7.9       175       124        60
OIR    2025250     91400   19.2200 -113.1300       7.9       175       120        60
OIR    2025250     91400   19.2200 -113.1400       7.9       175       119        60
OIR    2025250     91400   19.2200 -113.1500       7.9       175       116        60
OIR    2025250     91400   19.2200 -113.1600       7.9       176       116        60
OIR    2025250     91400   19.2200 -113.1700       7.9       176       116        60
OIR    2025250     91400   19.2200 -113.1800       7.9       176       116        60
OIR    2025250     91400   19.2200 -113.1900       7.9       176       116        60
OIR    2025250     91400   19.2200 -113.2000       8.0       176       116        60
OIR    2025250     91400   19.2200 -113.2100       8.0       176       115        60
OIR    2025250     91400   19.2200 -113.2200       8.0       176       114        60
OIR    2025250     91400   19.2200 -113.2300       8.0       176       112        60
OIR    2025250     91400   19.2200 -113.2400       8.0       176       110        60
OIR    2025250     91400   19.2200 -113.2500       8.0       176       110        60
OIR    2025250     91400   19.2200 -113.2600       8.0       176       110        60
OIR    2025250     91400   19.2200 -113.2700       8.0       176       109        60
OIR    2025250     91400   19.2200 -113.2800       8.0       176       108        60
OIR    2025250     91400   19.2200 -113.2900       8.1       176       108        60
OIR    2025250     91400   19.2200 -113.3000       8.1       176       107        60
OIR    2025250     91400   19.2200 -113.3100       8.1       176       107        60
OIR    2025250     91400   19.2200 -113.3200       8.1       176       105        60
OIR    2025250     91400   19.2200 -113.3300       8.2       176       105        60
OIR    2025250     91400   19.2200 -113.3400       8.2       176       105        60
OIR    2025250     91400   19.2200 -113.3500       8.2       176       105        60
OIR    2025250     91400   19.2200 -113.3600       8.2       176       104        60
OIR    2025250     91400   19.2200 -113.3700       8.2       176       105        60
OIR    2025250     91400   19.2200 -113.3800       8.3       176       105        60
OIR    2025250     91400   19.2200 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.2200 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.2200 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.2200 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.2200 -113.4300       8.5       176       104        60
OIR    2025250     91400   19.2200 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.2200 -113.4500       8.5       176       104        60
OIR    2025250     91400   19.2200 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.2200 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.2200 -113.4800       8.6       176       104        60
OIR    2025250     91400   19.2200 -113.4900       8.6       176       105        60
OIR    2025250     91400   19.2200 -113.5000       8.6       176       105        60
OIR    2025250     91400   19.2200 -113.5100       8.7       176       104        60
OIR    2025250     91400   19.2200 -113.5200       8.7       176       104        60
OIR    2025250     91400   19.2200 -113.5300       8.7       176       105        60
OIR    2025250     91400   19.2200 -113.5400       8.8       176       105        60
OIR    2025250     91400   19.2200 -113.5500       8.8       176       107        60
OIR    2025250     91400   19.2200 -113.5600       8.8       177       107        60
OIR    2025250     91400   19.2200 -113.5700       8.9       177       107        60
OIR    2025250     91400   19.2200 -113.5800       8.9       177       107        60
OIR    2025250     91400   19.2200 -113.5900       8.9       177       107        60
OIR    2025250     91400   19.2200 -113.6000       8.9       177       108        60
OIR    2025250     91400   19.2200 -113.6100       9.0       177       109        60
OIR    2025250     91400   19.2200 -113.6200       9.0       177       109        60
OIR    2025250     91400   19.2200 -113.6300       9.0       177       109        60
OIR    2025250     91400   19.2200 -113.6400       9.1       177       110        60
OIR    2025250     91400   19.2200 -113.6500       9.1       178       111        60
OIR    2025250     91400   19.2200 -113.6600       9.1       178       112        60
OIR    2025250     91400   19.2200 -113.6700       9.1       178       111        60
OIR    2025250     91400   19.2200 -113.6800       9.2       178       111        60
OIR    2025250     91400   19.2200 -113.6900       9.2       178       111        60
OIR    2025250     91400   19.2200 -113.7000       9.3       179       112        60
OIR    2025250     91400   19.2200 -113.7100       9.4       179       111        60
OIR    2025250     91400   19.2200 -113.7200       9.4       179       110        60
OIR    2025250     91400   19.2200 -113.7300       9.4       179       110        60
OIR    2025250     91400   19.2200 -113.7400       9.4       180       110        60
OIR    2025250     91400   19.2200 -113.7500       9.5       180       109        60
OIR    2025250     91400   19.2200 -113.7600       9.5       180       111        60
OIR    2025250     91400   19.2200 -113.7700       9.5       180       112        60
OIR    2025250     91400   19.2200 -113.7800       9.6       180       111        60
OIR    2025250     91400   19.2200 -113.7900       9.6       180       111        60
OIR    2025250     91400   19.2200 -113.8000       9.7       181       110        60
OIR    2025250     91400   19.2200 -113.8100       9.7       181       109        60
OIR    2025250     91400   19.2200 -113.8200       9.8       181       109        60
OIR    2025250     91400   19.2200 -113.8300       9.8       181       109        60
OIR    2025250     91400   19.2200 -113.8400       9.9       182       109        60
OIR    2025250     91400   19.2200 -113.8500       9.9       182       110        60
OIR    2025250     91400   19.2200 -113.8600      10.0       182       111        60
OIR    2025250     91400   19.2200 -113.8700      10.0       183       111        60
OIR    2025250     91400   19.2200 -113.8800      10.1       183       110        60
OIR    2025250     91400   19.2200 -113.8900      10.2       183       110        60
OIR    2025250     91400   19.2200 -113.9000      10.2       184       110        60
OIR    2025250     91400   19.2200 -113.9100      10.3       184       110        60
OIR    2025250     91400   19.2200 -113.9200      10.3       184       111        60
OIR    2025250     91400   19.2200 -113.9300      10.3       185       112        60
OIR    2025250     91400   19.2200 -113.9400      10.4       185       112        60
OIR    2025250     91400   19.2200 -113.9500      10.4       185       112        60
OIR    2025250     91400   19.2200 -113.9600      10.4       185       112        60
OIR    2025250     91400   19.2200 -113.9700      10.4       185       113        60
OIR    2025250     91400   19.2200 -113.9800      10.4       185       113        60
OIR    2025250     91400   19.2200 -113.9900      10.4       186       113        60
OIR    2025250     91400   19.2200 -114.0000      10.4       186       113        60
OIR    2025250     91400   19.2200 -114.0100      10.4       186       112        60
OIR    2025250     91400   19.2200 -114.0200      10.4       186       110        60
OIR    2025250     91400   19.2200 -114.0300      10.5       186       111        60
OIR    2025250     91400   19.2200 -114.0400      10.5       186       112        60
OIR    2025250     91400   19.2200 -114.0500      10.5       186       113        60
OIR    2025250     91400   19.2200 -114.0600      10.5       186       114        60
OIR    2025250     91400   19.2200 -114.0700      10.5       186       115        60
OIR    2025250     91400   19.2200 -114.0800      10.5       186       116        60
OIR    2025250     91400   19.2200 -114.0900      10.5       186       116        60
OIR    2025250     91400   19.2200 -114.1000      10.5       187       116        60
OIR    2025250     91400   19.2200 -114.1100      10.5       187       116        60
OIR    2025250     91400   19.2200 -114.1200      10.5       187       116        60
OIR    2025250     91400   19.2200 -114.1300      10.5       187       116        60
OIR    2025250     91400   19.2200 -114.1400      10.6       187       116        60
OIR    2025250     91400   19.2200 -114.1500      10.6       187       116        60
OIR    2025250     91400   19.2200 -114.1600      10.6       187       117        60
OIR    2025250     91400   19.2200 -114.1700      10.6       187       119        60
OIR    2025250     91400   19.2200 -114.1800      10.5       187       119        60
OIR    2025250     91400   19.2200 -114.1900      10.5       187       121        60
OIR    2025250     91400   19.2200 -114.2000      10.5       187       123        60
OIR    2025250     91400   19.2200 -114.2100      10.5       187       124        60
OIR    2025250     91400   19.2200 -114.2200      10.5       187       125        60
OIR    2025250     91400   19.2200 -114.2300      10.5       188       126        60
OIR    2025250     91400   19.2200 -114.2400      10.5       188       127        60
OIR    2025250     91400   19.2200 -114.2500      10.5       188       127        60
OIR    2025250     91400   19.2200 -114.2600      10.5       188       129        60
OIR    2025250     91400   19.2200 -114.2700      10.5       188       129        60
OIR    2025250     91400   19.2200 -114.2800      10.5       188       128        60
OIR    2025250     91400   19.2200 -114.2900      10.5       188       127        60
OIR    2025250     91400   19.2200 -114.3000      10.5       188       126        60
OIR    2025250     91400   19.2200 -114.3100      10.5       188       130        60
OIR    2025250     91400   19.2200 -114.3200      10.6       188       133        60
OIR    2025250     91400   19.2200 -114.3300      10.6       188       136        60
OIR    2025250     91400   19.2200 -114.3400      10.6       188       137        60
OIR    2025250     91400   19.2200 -114.3500      10.6       188       140        60
OIR    2025250     91400   19.2200 -114.3800      10.7       188       136        60
OIR    2025250     91400   19.2200 -114.3900      10.7       187       134        60
OIR    2025250     91400   19.2200 -114.4000      10.7       187       137        60
OIR    2025250     91400   19.2200 -114.4100      10.7       187       140        60
OIR    2025250     91400   19.2200 -114.4800      10.7       187       139        60
OIR    2025250     91400   19.2200 -114.4900      10.7       187       136        60
OIR    2025250     91400   19.2200 -114.5000      10.6       187       134        60
OIR    2025250     91400   19.2200 -114.5100      10.6       187       137        60
OIR    2025250     91400   19.2200 -116.0900       6.5       171       141        60
OIR    2025250     91400   19.2200 -116.1000       6.6       171       138        60
OIR    2025250     91400   19.2200 -116.1100       6.6       171       137        60
OIR    2025250     91400   19.2200 -116.1200       6.6       171       136        60
OIR    2025250     91400   19.2200 -116.1300       6.6       171       135        60
OIR    2025250     91400   19.2200 -116.1400       6.6       171       133        60
OIR    2025250     91400   19.2200 -116.1500       6.6       171       132        60
OIR    2025250     91400   19.2200 -116.1600       6.6       171       132        60
OIR    2025250     91400   19.2200 -116.1700       6.6       171       133        60
OIR    2025250     91400   19.2200 -116.1800       6.6       170       134        60
OIR    2025250     91400   19.2200 -116.1900       6.5       170       134        60
OIR    2025250     91400   19.2200 -116.2000       6.3       169       134        60
OIR    2025250     91400   19.2200 -116.2100       6.0       168       134        60
OIR    2025250     91400   19.2200 -116.2200       5.6       167       135        60
OIR    2025250     91400   19.2200 -116.2300       5.3       165       136        60
OIR    2025250     91400   19.2200 -116.2400       5.0       163       136        60
OIR    2025250     91400   19.2200 -116.2500       4.7       161       137        60
OIR    2025250     91400   19.2200 -116.2600       4.6       159       138        60
OIR    2025250     91400   19.2200 -116.2700       4.5       159       138        60
OIR    2025250     91400   19.2200 -116.2800       4.4       159       141        60
OIR    2025250     91400   19.2100 -111.0900      11.4        58       142        60
OIR    2025250     91400   19.2100 -111.4700       9.5        54       141        60
OIR    2025250     91400   19.2100 -111.4800       9.6        55       141        60
OIR    2025250     91400   19.2100 -111.4900       9.8        56       140        60
OIR    2025250     91400   19.2100 -111.5000       9.9        58       140        60
OIR    2025250     91400   19.2100 -111.5100      10.1        60       140        60
OIR    2025250     91400   19.2100 -111.5200      10.1        61       139        60
OIR    2025250     91400   19.2100 -111.5300      10.2        63       139        60
OIR    2025250     91400   19.2100 -111.5400      10.3        64       138        60
OIR    2025250     91400   19.2100 -111.5500      10.3        65       137        60
OIR    2025250     91400   19.2100 -111.5600      10.3        65       137        60
OIR    2025250     91400   19.2100 -111.5700      10.3        65       137        60
OIR    2025250     91400   19.2100 -111.5800      10.3        66       138        60
OIR    2025250     91400   19.2100 -111.5900      10.3        66       139        60
OIR    2025250     91400   19.2100 -112.8900       8.2       155       142        60
OIR    2025250     91400   19.2100 -112.9000       8.2       156       140        60
OIR    2025250     91400   19.2100 -112.9100       8.1       157       140        60
OIR    2025250     91400   19.2100 -112.9200       8.1       159       140        60
OIR    2025250     91400   19.2100 -112.9300       8.1       164       137        60
OIR    2025250     91400   19.2100 -112.9400       8.0       167       133        60
OIR    2025250     91400   19.2100 -112.9500       8.0       170       132        60
OIR    2025250     91400   19.2100 -112.9600       8.0       171       131        60
OIR    2025250     91400   19.2100 -112.9700       7.9       172       132        60
OIR    2025250     91400   19.2100 -112.9800       7.9       173       136        60
OIR    2025250     91400   19.2100 -112.9900       7.9       174       139        60
OIR    2025250     91400   19.2100 -113.0000       7.9       174       135        60
OIR    2025250     91400   19.2100 -113.0100       7.9       174       131        60
OIR    2025250     91400   19.2100 -113.0200       7.9       174       130        60
OIR    2025250     91400   19.2100 -113.0300       7.9       174       131        60
OIR    2025250     91400   19.2100 -113.0400       7.9       174       132        60
OIR    2025250     91400   19.2100 -113.0500       7.9       175       129        60
OIR    2025250     91400   19.2100 -113.0600       7.9       175       126        60
OIR    2025250     91400   19.2100 -113.0700       7.9       175       126        60
OIR    2025250     91400   19.2100 -113.0800       7.9       175       127        60
OIR    2025250     91400   19.2100 -113.0900       7.9       175       128        60
OIR    2025250     91400   19.2100 -113.1000       7.9       175       130        60
OIR    2025250     91400   19.2100 -113.1100       7.9       175       130        60
OIR    2025250     91400   19.2100 -113.1200       7.9       175       126        60
OIR    2025250     91400   19.2100 -113.1300       7.9       175       121        60
OIR    2025250     91400   19.2100 -113.1400       7.9       175       119        60
OIR    2025250     91400   19.2100 -113.1500       7.9       175       117        60
OIR    2025250     91400   19.2100 -113.1600       7.9       175       117        60
OIR    2025250     91400   19.2100 -113.1700       7.9       176       117        60
OIR    2025250     91400   19.2100 -113.1800       7.9       176       116        60
OIR    2025250     91400   19.2100 -113.1900       8.0       176       115        60
OIR    2025250     91400   19.2100 -113.2000       8.0       176       114        60
OIR    2025250     91400   19.2100 -113.2100       8.0       176       114        60
OIR    2025250     91400   19.2100 -113.2200       8.0       176       113        60
OIR    2025250     91400   19.2100 -113.2300       8.0       176       112        60
OIR    2025250     91400   19.2100 -113.2400       8.0       176       111        60
OIR    2025250     91400   19.2100 -113.2500       8.0       176       111        60
OIR    2025250     91400   19.2100 -113.2600       8.0       176       110        60
OIR    2025250     91400   19.2100 -113.2700       8.0       176       110        60
OIR    2025250     91400   19.2100 -113.2800       8.0       176       109        60
OIR    2025250     91400   19.2100 -113.2900       8.1       176       108        60
OIR    2025250     91400   19.2100 -113.3000       8.1       176       108        60
OIR    2025250     91400   19.2100 -113.3100       8.1       176       107        60
OIR    2025250     91400   19.2100 -113.3200       8.1       176       107        60
OIR    2025250     91400   19.2100 -113.3300       8.2       176       107        60
OIR    2025250     91400   19.2100 -113.3400       8.2       176       107        60
OIR    2025250     91400   19.2100 -113.3500       8.2       176       105        60
OIR    2025250     91400   19.2100 -113.3600       8.2       176       104        60
OIR    2025250     91400   19.2100 -113.3700       8.2       176       105        60
OIR    2025250     91400   19.2100 -113.3800       8.3       176       105        60
OIR    2025250     91400   19.2100 -113.3900       8.3       176       105        60
OIR    2025250     91400   19.2100 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.2100 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.2100 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.2100 -113.4300       8.5       176       104        60
OIR    2025250     91400   19.2100 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.2100 -113.4500       8.5       176       104        60
OIR    2025250     91400   19.2100 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.2100 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.2100 -113.4800       8.6       176       105        60
OIR    2025250     91400   19.2100 -113.4900       8.6       176       105        60
OIR    2025250     91400   19.2100 -113.5000       8.6       176       105        60
OIR    2025250     91400   19.2100 -113.5100       8.7       176       105        60
OIR    2025250     91400   19.2100 -113.5200       8.7       176       105        60
OIR    2025250     91400   19.2100 -113.5300       8.7       176       107        60
OIR    2025250     91400   19.2100 -113.5400       8.8       176       107        60
OIR    2025250     91400   19.2100 -113.5500       8.8       176       107        60
OIR    2025250     91400   19.2100 -113.5600       8.9       177       107        60
OIR    2025250     91400   19.2100 -113.5700       8.9       177       107        60
OIR    2025250     91400   19.2100 -113.5800       8.9       177       108        60
OIR    2025250     91400   19.2100 -113.5900       8.9       177       108        60
OIR    2025250     91400   19.2100 -113.6000       8.9       177       109        60
OIR    2025250     91400   19.2100 -113.6100       9.0       177       109        60
OIR    2025250     91400   19.2100 -113.6200       9.0       177       110        60
OIR    2025250     91400   19.2100 -113.6300       9.0       177       110        60
OIR    2025250     91400   19.2100 -113.6400       9.1       177       110        60
OIR    2025250     91400   19.2100 -113.6500       9.1       178       111        60
OIR    2025250     91400   19.2100 -113.6600       9.1       178       112        60
OIR    2025250     91400   19.2100 -113.6700       9.2       178       112        60
OIR    2025250     91400   19.2100 -113.6800       9.2       178       111        60
OIR    2025250     91400   19.2100 -113.6900       9.2       178       112        60
OIR    2025250     91400   19.2100 -113.7000       9.3       179       112        60
OIR    2025250     91400   19.2100 -113.7100       9.4       179       112        60
OIR    2025250     91400   19.2100 -113.7200       9.4       179       111        60
OIR    2025250     91400   19.2100 -113.7300       9.4       179       110        60
OIR    2025250     91400   19.2100 -113.7400       9.5       180       110        60
OIR    2025250     91400   19.2100 -113.7500       9.5       180       109        60
OIR    2025250     91400   19.2100 -113.7600       9.5       180       110        60
OIR    2025250     91400   19.2100 -113.7700       9.6       180       111        60
OIR    2025250     91400   19.2100 -113.7800       9.6       180       112        60
OIR    2025250     91400   19.2100 -113.7900       9.7       181       112        60
OIR    2025250     91400   19.2100 -113.8000       9.7       181       111        60
OIR    2025250     91400   19.2100 -113.8100       9.8       181       110        60
OIR    2025250     91400   19.2100 -113.8200       9.8       182       109        60
OIR    2025250     91400   19.2100 -113.8300       9.9       182       109        60
OIR    2025250     91400   19.2100 -113.8400       9.9       182       109        60
OIR    2025250     91400   19.2100 -113.8500      10.0       182       110        60
OIR    2025250     91400   19.2100 -113.8600      10.0       183       111        60
OIR    2025250     91400   19.2100 -113.8700      10.1       183       111        60
OIR    2025250     91400   19.2100 -113.8800      10.2       183       111        60
OIR    2025250     91400   19.2100 -113.8900      10.2       184       110        60
OIR    2025250     91400   19.2100 -113.9000      10.3       184       110        60
OIR    2025250     91400   19.2100 -113.9100      10.3       184       110        60
OIR    2025250     91400   19.2100 -113.9200      10.3       185       111        60
OIR    2025250     91400   19.2100 -113.9300      10.4       185       113        60
OIR    2025250     91400   19.2100 -113.9400      10.4       185       113        60
OIR    2025250     91400   19.2100 -113.9500      10.4       185       112        60
OIR    2025250     91400   19.2100 -113.9600      10.4       185       112        60
OIR    2025250     91400   19.2100 -113.9700      10.5       185       113        60
OIR    2025250     91400   19.2100 -113.9800      10.5       186       114        60
OIR    2025250     91400   19.2100 -113.9900      10.5       186       113        60
OIR    2025250     91400   19.2100 -114.0000      10.5       186       113        60
OIR    2025250     91400   19.2100 -114.0100      10.5       186       112        60
OIR    2025250     91400   19.2100 -114.0200      10.5       186       111        60
OIR    2025250     91400   19.2100 -114.0300      10.5       186       112        60
OIR    2025250     91400   19.2100 -114.0400      10.5       186       113        60
OIR    2025250     91400   19.2100 -114.0500      10.5       186       114        60
OIR    2025250     91400   19.2100 -114.0600      10.5       186       114        60
OIR    2025250     91400   19.2100 -114.0700      10.5       186       114        60
OIR    2025250     91400   19.2100 -114.0800      10.5       186       115        60
OIR    2025250     91400   19.2100 -114.0900      10.5       187       115        60
OIR    2025250     91400   19.2100 -114.1000      10.6       187       116        60
OIR    2025250     91400   19.2100 -114.1100      10.6       187       116        60
OIR    2025250     91400   19.2100 -114.1200      10.6       187       116        60
OIR    2025250     91400   19.2100 -114.1300      10.6       187       117        60
OIR    2025250     91400   19.2100 -114.1400      10.6       187       117        60
OIR    2025250     91400   19.2100 -114.1500      10.6       187       119        60
OIR    2025250     91400   19.2100 -114.1600      10.6       187       120        60
OIR    2025250     91400   19.2100 -114.1700      10.6       187       120        60
OIR    2025250     91400   19.2100 -114.1800      10.6       187       121        60
OIR    2025250     91400   19.2100 -114.1900      10.6       187       122        60
OIR    2025250     91400   19.2100 -114.2000      10.6       187       123        60
OIR    2025250     91400   19.2100 -114.2100      10.6       187       125        60
OIR    2025250     91400   19.2100 -114.2200      10.6       187       125        60
OIR    2025250     91400   19.2100 -114.2300      10.5       188       125        60
OIR    2025250     91400   19.2100 -114.2400      10.5       188       127        60
OIR    2025250     91400   19.2100 -114.2500      10.5       188       129        60
OIR    2025250     91400   19.2100 -114.2600      10.5       188       130        60
OIR    2025250     91400   19.2100 -114.2700      10.5       188       131        60
OIR    2025250     91400   19.2100 -114.2800      10.5       188       130        60
OIR    2025250     91400   19.2100 -114.2900      10.5       188       129        60
OIR    2025250     91400   19.2100 -114.3000      10.6       188       127        60
OIR    2025250     91400   19.2100 -114.3100      10.6       188       130        60
OIR    2025250     91400   19.2100 -114.3200      10.6       188       133        60
OIR    2025250     91400   19.2100 -114.3300      10.6       188       134        60
OIR    2025250     91400   19.2100 -114.3400      10.6       188       135        60
OIR    2025250     91400   19.2100 -114.3500      10.6       188       137        60
OIR    2025250     91400   19.2100 -114.3600      10.7       188       141        60
OIR    2025250     91400   19.2100 -114.3800      10.7       188       138        60
OIR    2025250     91400   19.2100 -114.3900      10.7       187       135        60
OIR    2025250     91400   19.2100 -114.4000      10.7       187       138        60
OIR    2025250     91400   19.2100 -114.4900      10.7       187       139        60
OIR    2025250     91400   19.2100 -114.5000      10.6       187       134        60
OIR    2025250     91400   19.2100 -114.5100      10.6       187       136        60
OIR    2025250     91400   19.2100 -116.0900       6.5       172       141        60
OIR    2025250     91400   19.2100 -116.1000       6.6       171       138        60
OIR    2025250     91400   19.2100 -116.1100       6.6       171       137        60
OIR    2025250     91400   19.2100 -116.1200       6.6       171       136        60
OIR    2025250     91400   19.2100 -116.1300       6.6       171       135        60
OIR    2025250     91400   19.2100 -116.1400       6.6       171       133        60
OIR    2025250     91400   19.2100 -116.1500       6.6       171       132        60
OIR    2025250     91400   19.2100 -116.1600       6.6       171       132        60
OIR    2025250     91400   19.2100 -116.1700       6.6       171       132        60
OIR    2025250     91400   19.2100 -116.1800       6.6       171       132        60
OIR    2025250     91400   19.2100 -116.1900       6.5       170       133        60
OIR    2025250     91400   19.2100 -116.2000       6.4       170       133        60
OIR    2025250     91400   19.2100 -116.2100       6.2       169       134        60
OIR    2025250     91400   19.2100 -116.2200       5.8       168       134        60
OIR    2025250     91400   19.2100 -116.2300       5.4       166       135        60
OIR    2025250     91400   19.2100 -116.2400       5.1       164       136        60
OIR    2025250     91400   19.2100 -116.2500       4.9       162       137        60
OIR    2025250     91400   19.2100 -116.2600       4.7       161       138        60
OIR    2025250     91400   19.2100 -116.2700       4.6       160       139        60
OIR    2025250     91400   19.2100 -116.2800       4.5       160       141        60
OIR    2025250     91400   19.2000 -111.4700       9.5        55       142        60
OIR    2025250     91400   19.2000 -111.4800       9.6        56       140        60
OIR    2025250     91400   19.2000 -111.4900       9.7        57       139        60
OIR    2025250     91400   19.2000 -111.5000       9.8        59       138        60
OIR    2025250     91400   19.2000 -111.5100      10.0        61       139        60
OIR    2025250     91400   19.2000 -111.5200      10.1        62       138        60
OIR    2025250     91400   19.2000 -111.5300      10.2        64       137        60
OIR    2025250     91400   19.2000 -111.5400      10.2        65       136        60
OIR    2025250     91400   19.2000 -111.5500      10.2        65       135        60
OIR    2025250     91400   19.2000 -111.5600      10.2        65       136        60
OIR    2025250     91400   19.2000 -111.5700      10.2        65       136        60
OIR    2025250     91400   19.2000 -111.5800      10.3        66       137        60
OIR    2025250     91400   19.2000 -111.5900      10.3        66       138        60
OIR    2025250     91400   19.2000 -111.6900      14.3        71       141        60
OIR    2025250     91400   19.2000 -112.9000       8.2       155       140        60
OIR    2025250     91400   19.2000 -112.9100       8.1       156       139        60
OIR    2025250     91400   19.2000 -112.9200       8.1       158       137        60
OIR    2025250     91400   19.2000 -112.9300       8.1       163       135        60
OIR    2025250     91400   19.2000 -112.9400       8.1       167       133        60
OIR    2025250     91400   19.2000 -112.9500       8.0       169       132        60
OIR    2025250     91400   19.2000 -112.9600       8.0       171       131        60
OIR    2025250     91400   19.2000 -112.9700       7.9       172       131        60
OIR    2025250     91400   19.2000 -112.9800       7.9       173       135        60
OIR    2025250     91400   19.2000 -112.9900       7.9       174       140        60
OIR    2025250     91400   19.2000 -113.0000       7.9       174       136        60
OIR    2025250     91400   19.2000 -113.0100       7.9       174       131        60
OIR    2025250     91400   19.2000 -113.0200       7.9       174       131        60
OIR    2025250     91400   19.2000 -113.0300       7.9       174       134        60
OIR    2025250     91400   19.2000 -113.0400       7.9       174       137        60
OIR    2025250     91400   19.2000 -113.0500       7.9       175       133        60
OIR    2025250     91400   19.2000 -113.0600       7.9       175       127        60
OIR    2025250     91400   19.2000 -113.0700       7.9       175       127        60
OIR    2025250     91400   19.2000 -113.0800       7.9       175       129        60
OIR    2025250     91400   19.2000 -113.0900       7.9       175       128        60
OIR    2025250     91400   19.2000 -113.1000       7.9       175       127        60
OIR    2025250     91400   19.2000 -113.1100       7.9       175       125        60
OIR    2025250     91400   19.2000 -113.1200       7.9       175       123        60
OIR    2025250     91400   19.2000 -113.1300       7.9       175       121        60
OIR    2025250     91400   19.2000 -113.1400       7.9       175       120        60
OIR    2025250     91400   19.2000 -113.1500       7.9       175       117        60
OIR    2025250     91400   19.2000 -113.1600       7.9       175       117        60
OIR    2025250     91400   19.2000 -113.1700       7.9       176       116        60
OIR    2025250     91400   19.2000 -113.1800       7.9       176       116        60
OIR    2025250     91400   19.2000 -113.1900       8.0       176       116        60
OIR    2025250     91400   19.2000 -113.2000       8.0       176       115        60
OIR    2025250     91400   19.2000 -113.2100       8.0       176       114        60
OIR    2025250     91400   19.2000 -113.2200       8.0       176       113        60
OIR    2025250     91400   19.2000 -113.2300       8.0       176       113        60
OIR    2025250     91400   19.2000 -113.2400       8.0       176       112        60
OIR    2025250     91400   19.2000 -113.2500       8.0       176       111        60
OIR    2025250     91400   19.2000 -113.2600       8.0       176       111        60
OIR    2025250     91400   19.2000 -113.2700       8.0       176       110        60
OIR    2025250     91400   19.2000 -113.2800       8.0       176       110        60
OIR    2025250     91400   19.2000 -113.2900       8.1       176       109        60
OIR    2025250     91400   19.2000 -113.3000       8.1       176       108        60
OIR    2025250     91400   19.2000 -113.3100       8.1       176       108        60
OIR    2025250     91400   19.2000 -113.3200       8.1       176       107        60
OIR    2025250     91400   19.2000 -113.3300       8.2       176       107        60
OIR    2025250     91400   19.2000 -113.3400       8.2       176       107        60
OIR    2025250     91400   19.2000 -113.3500       8.2       176       105        60
OIR    2025250     91400   19.2000 -113.3600       8.2       176       105        60
OIR    2025250     91400   19.2000 -113.3700       8.2       176       105        60
OIR    2025250     91400   19.2000 -113.3800       8.3       176       105        60
OIR    2025250     91400   19.2000 -113.3900       8.3       176       105        60
OIR    2025250     91400   19.2000 -113.4000       8.3       176       105        60
OIR    2025250     91400   19.2000 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.2000 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.2000 -113.4300       8.5       176       104        60
OIR    2025250     91400   19.2000 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.2000 -113.4500       8.5       176       103        60
OIR    2025250     91400   19.2000 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.2000 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.2000 -113.4800       8.6       176       105        60
OIR    2025250     91400   19.2000 -113.4900       8.6       176       105        60
OIR    2025250     91400   19.2000 -113.5000       8.6       176       107        60
OIR    2025250     91400   19.2000 -113.5100       8.7       176       107        60
OIR    2025250     91400   19.2000 -113.5200       8.7       176       107        60
OIR    2025250     91400   19.2000 -113.5300       8.7       176       107        60
OIR    2025250     91400   19.2000 -113.5400       8.8       176       107        60
OIR    2025250     91400   19.2000 -113.5500       8.8       176       107        60
OIR    2025250     91400   19.2000 -113.5600       8.9       177       108        60
OIR    2025250     91400   19.2000 -113.5700       8.9       177       108        60
OIR    2025250     91400   19.2000 -113.5800       8.9       177       108        60
OIR    2025250     91400   19.2000 -113.5900       8.9       177       109        60
OIR    2025250     91400   19.2000 -113.6000       9.0       177       110        60
OIR    2025250     91400   19.2000 -113.6100       9.0       177       110        60
OIR    2025250     91400   19.2000 -113.6200       9.0       177       111        60
OIR    2025250     91400   19.2000 -113.6300       9.1       177       111        60
OIR    2025250     91400   19.2000 -113.6400       9.1       178       111        60
OIR    2025250     91400   19.2000 -113.6500       9.1       178       112        60
OIR    2025250     91400   19.2000 -113.6600       9.1       178       112        60
OIR    2025250     91400   19.2000 -113.6700       9.2       178       112        60
OIR    2025250     91400   19.2000 -113.6800       9.2       178       112        60
OIR    2025250     91400   19.2000 -113.6900       9.3       178       112        60
OIR    2025250     91400   19.2000 -113.7000       9.3       179       112        60
OIR    2025250     91400   19.2000 -113.7100       9.4       179       112        60
OIR    2025250     91400   19.2000 -113.7200       9.4       179       112        60
OIR    2025250     91400   19.2000 -113.7300       9.5       180       112        60
OIR    2025250     91400   19.2000 -113.7400       9.5       180       111        60
OIR    2025250     91400   19.2000 -113.7500       9.5       180       111        60
OIR    2025250     91400   19.2000 -113.7600       9.6       180       110        60
OIR    2025250     91400   19.2000 -113.7700       9.6       180       110        60
OIR    2025250     91400   19.2000 -113.7800       9.7       181       110        60
OIR    2025250     91400   19.2000 -113.7900       9.8       181       111        60
OIR    2025250     91400   19.2000 -113.8000       9.8       181       112        60
OIR    2025250     91400   19.2000 -113.8100       9.9       181       111        60
OIR    2025250     91400   19.2000 -113.8200       9.9       182       110        60
OIR    2025250     91400   19.2000 -113.8300       9.9       182       110        60
OIR    2025250     91400   19.2000 -113.8400      10.0       182       110        60
OIR    2025250     91400   19.2000 -113.8500      10.0       182       110        60
OIR    2025250     91400   19.2000 -113.8600      10.1       183       110        60
OIR    2025250     91400   19.2000 -113.8700      10.2       183       111        60
OIR    2025250     91400   19.2000 -113.8800      10.2       184       110        60
OIR    2025250     91400   19.2000 -113.8900      10.3       184       110        60
OIR    2025250     91400   19.2000 -113.9000      10.3       184       110        60
OIR    2025250     91400   19.2000 -113.9100      10.4       185       110        60
OIR    2025250     91400   19.2000 -113.9200      10.4       185       111        60
OIR    2025250     91400   19.2000 -113.9300      10.4       185       112        60
OIR    2025250     91400   19.2000 -113.9400      10.5       185       112        60
OIR    2025250     91400   19.2000 -113.9500      10.5       185       113        60
OIR    2025250     91400   19.2000 -113.9600      10.5       185       112        60
OIR    2025250     91400   19.2000 -113.9700      10.5       186       113        60
OIR    2025250     91400   19.2000 -113.9800      10.5       186       114        60
OIR    2025250     91400   19.2000 -113.9900      10.5       186       114        60
OIR    2025250     91400   19.2000 -114.0000      10.5       186       113        60
OIR    2025250     91400   19.2000 -114.0100      10.5       186       113        60
OIR    2025250     91400   19.2000 -114.0200      10.5       186       112        60
OIR    2025250     91400   19.2000 -114.0300      10.5       186       112        60
OIR    2025250     91400   19.2000 -114.0400      10.5       186       113        60
OIR    2025250     91400   19.2000 -114.0500      10.5       186       114        60
OIR    2025250     91400   19.2000 -114.0600      10.5       186       114        60
OIR    2025250     91400   19.2000 -114.0700      10.6       186       114        60
OIR    2025250     91400   19.2000 -114.0800      10.6       187       114        60
OIR    2025250     91400   19.2000 -114.0900      10.6       187       114        60
OIR    2025250     91400   19.2000 -114.1000      10.6       187       115        60
OIR    2025250     91400   19.2000 -114.1100      10.6       187       116        60
OIR    2025250     91400   19.2000 -114.1200      10.6       187       116        60
OIR    2025250     91400   19.2000 -114.1300      10.6       187       117        60
OIR    2025250     91400   19.2000 -114.1400      10.6       187       119        60
OIR    2025250     91400   19.2000 -114.1500      10.6       187       120        60
OIR    2025250     91400   19.2000 -114.1600      10.6       187       121        60
OIR    2025250     91400   19.2000 -114.1700      10.6       187       122        60
OIR    2025250     91400   19.2000 -114.1800      10.6       187       122        60
OIR    2025250     91400   19.2000 -114.1900      10.6       187       123        60
OIR    2025250     91400   19.2000 -114.2000      10.6       187       124        60
OIR    2025250     91400   19.2000 -114.2100      10.6       187       126        60
OIR    2025250     91400   19.2000 -114.2200      10.6       188       125        60
OIR    2025250     91400   19.2000 -114.2300      10.6       188       125        60
OIR    2025250     91400   19.2000 -114.2400      10.6       188       126        60
OIR    2025250     91400   19.2000 -114.2500      10.6       188       129        60
OIR    2025250     91400   19.2000 -114.2600      10.6       188       131        60
OIR    2025250     91400   19.2000 -114.2700      10.6       188       132        60
OIR    2025250     91400   19.2000 -114.2800      10.6       188       132        60
OIR    2025250     91400   19.2000 -114.2900      10.6       188       130        60
OIR    2025250     91400   19.2000 -114.3000      10.6       188       129        60
OIR    2025250     91400   19.2000 -114.3100      10.6       188       131        60
OIR    2025250     91400   19.2000 -114.3200      10.6       188       134        60
OIR    2025250     91400   19.2000 -114.3300      10.6       188       134        60
OIR    2025250     91400   19.2000 -114.3400      10.7       188       133        60
OIR    2025250     91400   19.2000 -114.3500      10.7       188       133        60
OIR    2025250     91400   19.2000 -114.3600      10.7       188       137        60
OIR    2025250     91400   19.2000 -114.3800      10.7       187       140        60
OIR    2025250     91400   19.2000 -114.3900      10.7       187       139        60
OIR    2025250     91400   19.2000 -114.4000      10.7       187       140        60
OIR    2025250     91400   19.2000 -114.5100      10.6       187       140        60
OIR    2025250     91400   19.2000 -116.0900       6.6       172       141        60
OIR    2025250     91400   19.2000 -116.1000       6.6       171       138        60
OIR    2025250     91400   19.2000 -116.1100       6.6       171       137        60
OIR    2025250     91400   19.2000 -116.1200       6.6       171       135        60
OIR    2025250     91400   19.2000 -116.1300       6.6       171       134        60
OIR    2025250     91400   19.2000 -116.1400       6.6       171       133        60
OIR    2025250     91400   19.2000 -116.1500       6.6       171       132        60
OIR    2025250     91400   19.2000 -116.1600       6.6       171       132        60
OIR    2025250     91400   19.2000 -116.1700       6.6       171       132        60
OIR    2025250     91400   19.2000 -116.1800       6.6       171       133        60
OIR    2025250     91400   19.2000 -116.1900       6.5       171       134        60
OIR    2025250     91400   19.2000 -116.2000       6.5       171       134        60
OIR    2025250     91400   19.2000 -116.2100       6.4       170       134        60
OIR    2025250     91400   19.2000 -116.2200       6.2       170       135        60
OIR    2025250     91400   19.2000 -116.2300       5.8       168       135        60
OIR    2025250     91400   19.2000 -116.2400       5.4       166       136        60
OIR    2025250     91400   19.2000 -116.2500       5.1       164       138        60
OIR    2025250     91400   19.2000 -116.2600       4.9       163       140        60
OIR    2025250     91400   19.2000 -116.2700       4.7       162       141        60
OIR    2025250     91400   19.2000 -116.2800       4.5       161       142        60
OIR    2025250     91400   19.1900 -110.0600      14.1       108       135        60
OIR    2025250     91400   19.1900 -110.6600      14.2        96       147        60
OIR    2025250     91400   19.1900 -111.4800       9.6        57       141        60
OIR    2025250     91400   19.1900 -111.4900       9.7        58       138        60
OIR    2025250     91400   19.1900 -111.5000       9.8        60       137        60
OIR    2025250     91400   19.1900 -111.5100       9.9        62       137        60
OIR    2025250     91400   19.1900 -111.5200      10.0        64       137        60
OIR    2025250     91400   19.1900 -111.5300      10.1        64       136        60
OIR    2025250     91400   19.1900 -111.5400      10.2        65       135        60
OIR    2025250     91400   19.1900 -111.5500      10.2        65       135        60
OIR    2025250     91400   19.1900 -111.5600      10.2        65       137        60
OIR    2025250     91400   19.1900 -111.5700      10.2        66       139        60
OIR    2025250     91400   19.1900 -111.5800      10.2        66       138        60
OIR    2025250     91400   19.1900 -111.5900      10.2        66       138        60
OIR    2025250     91400   19.1900 -111.6900      14.2        71       142        60
OIR    2025250     91400   19.1900 -112.9000       8.1       155       141        60
OIR    2025250     91400   19.1900 -112.9100       8.1       156       139        60
OIR    2025250     91400   19.1900 -112.9200       8.1       158       138        60
OIR    2025250     91400   19.1900 -112.9300       8.1       162       137        60
OIR    2025250     91400   19.1900 -112.9400       8.1       166       135        60
OIR    2025250     91400   19.1900 -112.9500       8.0       169       135        60
OIR    2025250     91400   19.1900 -112.9600       8.0       171       135        60
OIR    2025250     91400   19.1900 -112.9700       7.9       172       136        60
OIR    2025250     91400   19.1900 -112.9800       7.9       173       138        60
OIR    2025250     91400   19.1900 -112.9900       7.9       174       140        60
OIR    2025250     91400   19.1900 -113.0000       7.9       174       139        60
OIR    2025250     91400   19.1900 -113.0100       7.9       174       135        60
OIR    2025250     91400   19.1900 -113.0200       7.9       174       133        60
OIR    2025250     91400   19.1900 -113.0300       7.9       174       136        60
OIR    2025250     91400   19.1900 -113.0400       7.9       174       139        60
OIR    2025250     91400   19.1900 -113.0500       7.9       175       135        60
OIR    2025250     91400   19.1900 -113.0600       7.9       175       129        60
OIR    2025250     91400   19.1900 -113.0700       7.9       175       127        60
OIR    2025250     91400   19.1900 -113.0800       7.9       175       129        60
OIR    2025250     91400   19.1900 -113.0900       7.9       175       129        60
OIR    2025250     91400   19.1900 -113.1000       7.9       175       125        60
OIR    2025250     91400   19.1900 -113.1100       7.9       175       122        60
OIR    2025250     91400   19.1900 -113.1200       7.9       175       121        60
OIR    2025250     91400   19.1900 -113.1300       7.9       175       121        60
OIR    2025250     91400   19.1900 -113.1400       7.9       175       120        60
OIR    2025250     91400   19.1900 -113.1500       7.9       175       120        60
OIR    2025250     91400   19.1900 -113.1600       7.9       175       119        60
OIR    2025250     91400   19.1900 -113.1700       7.9       175       116        60
OIR    2025250     91400   19.1900 -113.1800       7.9       176       116        60
OIR    2025250     91400   19.1900 -113.1900       7.9       176       116        60
OIR    2025250     91400   19.1900 -113.2000       8.0       176       115        60
OIR    2025250     91400   19.1900 -113.2100       8.0       176       114        60
OIR    2025250     91400   19.1900 -113.2200       8.0       176       114        60
OIR    2025250     91400   19.1900 -113.2300       8.0       176       113        60
OIR    2025250     91400   19.1900 -113.2400       8.0       176       112        60
OIR    2025250     91400   19.1900 -113.2500       8.0       176       111        60
OIR    2025250     91400   19.1900 -113.2600       8.0       176       111        60
OIR    2025250     91400   19.1900 -113.2700       8.0       176       111        60
OIR    2025250     91400   19.1900 -113.2800       8.0       176       110        60
OIR    2025250     91400   19.1900 -113.2900       8.1       176       109        60
OIR    2025250     91400   19.1900 -113.3000       8.1       176       109        60
OIR    2025250     91400   19.1900 -113.3100       8.1       176       108        60
OIR    2025250     91400   19.1900 -113.3200       8.1       176       108        60
OIR    2025250     91400   19.1900 -113.3300       8.2       176       107        60
OIR    2025250     91400   19.1900 -113.3400       8.2       176       107        60
OIR    2025250     91400   19.1900 -113.3500       8.2       176       107        60
OIR    2025250     91400   19.1900 -113.3600       8.2       176       105        60
OIR    2025250     91400   19.1900 -113.3700       8.2       176       105        60
OIR    2025250     91400   19.1900 -113.3800       8.3       176       105        60
OIR    2025250     91400   19.1900 -113.3900       8.3       176       105        60
OIR    2025250     91400   19.1900 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.1900 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.1900 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.1900 -113.4300       8.5       176       104        60
OIR    2025250     91400   19.1900 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.1900 -113.4500       8.5       176       104        60
OIR    2025250     91400   19.1900 -113.4600       8.6       176       103        60
OIR    2025250     91400   19.1900 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.1900 -113.4800       8.6       176       105        60
OIR    2025250     91400   19.1900 -113.4900       8.6       176       105        60
OIR    2025250     91400   19.1900 -113.5000       8.7       176       107        60
OIR    2025250     91400   19.1900 -113.5100       8.7       176       107        60
OIR    2025250     91400   19.1900 -113.5200       8.7       176       107        60
OIR    2025250     91400   19.1900 -113.5300       8.7       176       107        60
OIR    2025250     91400   19.1900 -113.5400       8.8       176       107        60
OIR    2025250     91400   19.1900 -113.5500       8.8       176       108        60
OIR    2025250     91400   19.1900 -113.5600       8.9       177       108        60
OIR    2025250     91400   19.1900 -113.5700       8.9       177       108        60
OIR    2025250     91400   19.1900 -113.5800       8.9       177       109        60
OIR    2025250     91400   19.1900 -113.5900       8.9       177       109        60
OIR    2025250     91400   19.1900 -113.6000       9.0       177       110        60
OIR    2025250     91400   19.1900 -113.6100       9.0       177       110        60
OIR    2025250     91400   19.1900 -113.6200       9.0       177       110        60
OIR    2025250     91400   19.1900 -113.6300       9.1       177       110        60
OIR    2025250     91400   19.1900 -113.6400       9.1       178       111        60
OIR    2025250     91400   19.1900 -113.6500       9.1       178       111        60
OIR    2025250     91400   19.1900 -113.6600       9.2       178       112        60
OIR    2025250     91400   19.1900 -113.6700       9.2       178       112        60
OIR    2025250     91400   19.1900 -113.6800       9.2       178       112        60
OIR    2025250     91400   19.1900 -113.6900       9.3       178       112        60
OIR    2025250     91400   19.1900 -113.7000       9.4       179       112        60
OIR    2025250     91400   19.1900 -113.7100       9.4       179       113        60
OIR    2025250     91400   19.1900 -113.7200       9.4       179       113        60
OIR    2025250     91400   19.1900 -113.7300       9.5       180       113        60
OIR    2025250     91400   19.1900 -113.7400       9.5       180       112        60
OIR    2025250     91400   19.1900 -113.7500       9.6       180       111        60
OIR    2025250     91400   19.1900 -113.7600       9.6       180       110        60
OIR    2025250     91400   19.1900 -113.7700       9.7       181       110        60
OIR    2025250     91400   19.1900 -113.7800       9.8       181       109        60
OIR    2025250     91400   19.1900 -113.7900       9.8       181       111        60
OIR    2025250     91400   19.1900 -113.8000       9.9       181       112        60
OIR    2025250     91400   19.1900 -113.8100       9.9       182       112        60
OIR    2025250     91400   19.1900 -113.8200      10.0       182       111        60
OIR    2025250     91400   19.1900 -113.8300      10.0       182       111        60
OIR    2025250     91400   19.1900 -113.8400      10.1       183       110        60
OIR    2025250     91400   19.1900 -113.8500      10.1       183       110        60
OIR    2025250     91400   19.1900 -113.8600      10.2       183       110        60
OIR    2025250     91400   19.1900 -113.8700      10.3       184       110        60
OIR    2025250     91400   19.1900 -113.8800      10.3       184       110        60
OIR    2025250     91400   19.1900 -113.8900      10.4       184       110        60
OIR    2025250     91400   19.1900 -113.9000      10.4       185       110        60
OIR    2025250     91400   19.1900 -113.9100      10.4       185       110        60
OIR    2025250     91400   19.1900 -113.9200      10.5       185       110        60
OIR    2025250     91400   19.1900 -113.9300      10.5       185       111        60
OIR    2025250     91400   19.1900 -113.9400      10.5       185       112        60
OIR    2025250     91400   19.1900 -113.9500      10.5       185       113        60
OIR    2025250     91400   19.1900 -113.9600      10.5       186       114        60
OIR    2025250     91400   19.1900 -113.9700      10.5       186       114        60
OIR    2025250     91400   19.1900 -113.9800      10.5       186       114        60
OIR    2025250     91400   19.1900 -113.9900      10.5       186       114        60
OIR    2025250     91400   19.1900 -114.0000      10.5       186       113        60
OIR    2025250     91400   19.1900 -114.0100      10.6       186       113        60
OIR    2025250     91400   19.1900 -114.0200      10.6       186       113        60
OIR    2025250     91400   19.1900 -114.0300      10.6       186       113        60
OIR    2025250     91400   19.1900 -114.0400      10.6       186       114        60
OIR    2025250     91400   19.1900 -114.0500      10.6       186       114        60
OIR    2025250     91400   19.1900 -114.0600      10.6       187       114        60
OIR    2025250     91400   19.1900 -114.0700      10.6       187       113        60
OIR    2025250     91400   19.1900 -114.0800      10.6       187       113        60
OIR    2025250     91400   19.1900 -114.0900      10.6       187       113        60
OIR    2025250     91400   19.1900 -114.1000      10.6       187       113        60
OIR    2025250     91400   19.1900 -114.1100      10.6       187       115        60
OIR    2025250     91400   19.1900 -114.1200      10.6       187       116        60
OIR    2025250     91400   19.1900 -114.1300      10.6       187       117        60
OIR    2025250     91400   19.1900 -114.1400      10.6       187       119        60
OIR    2025250     91400   19.1900 -114.1500      10.6       187       120        60
OIR    2025250     91400   19.1900 -114.1600      10.6       187       121        60
OIR    2025250     91400   19.1900 -114.1700      10.6       187       122        60
OIR    2025250     91400   19.1900 -114.1800      10.6       187       123        60
OIR    2025250     91400   19.1900 -114.1900      10.6       187       124        60
OIR    2025250     91400   19.1900 -114.2000      10.6       187       125        60
OIR    2025250     91400   19.1900 -114.2100      10.6       187       127        60
OIR    2025250     91400   19.1900 -114.2200      10.6       188       126        60
OIR    2025250     91400   19.1900 -114.2300      10.6       188       125        60
OIR    2025250     91400   19.1900 -114.2400      10.6       188       125        60
OIR    2025250     91400   19.1900 -114.2500      10.6       188       127        60
OIR    2025250     91400   19.1900 -114.2600      10.6       188       128        60
OIR    2025250     91400   19.1900 -114.2700      10.6       188       129        60
OIR    2025250     91400   19.1900 -114.2800      10.6       188       131        60
OIR    2025250     91400   19.1900 -114.2900      10.6       188       132        60
OIR    2025250     91400   19.1900 -114.3000      10.6       188       133        60
OIR    2025250     91400   19.1900 -114.3100      10.6       188       134        60
OIR    2025250     91400   19.1900 -114.3200      10.7       188       136        60
OIR    2025250     91400   19.1900 -114.3300      10.7       188       135        60
OIR    2025250     91400   19.1900 -114.3400      10.7       188       133        60
OIR    2025250     91400   19.1900 -114.3500      10.7       188       132        60
OIR    2025250     91400   19.1900 -114.3600      10.7       188       136        60
OIR    2025250     91400   19.1900 -114.3700      10.7       188       140        60
OIR    2025250     91400   19.1900 -114.3900      10.8       187       140        60
OIR    2025250     91400   19.1900 -116.0900       6.6       172       141        60
OIR    2025250     91400   19.1900 -116.1000       6.6       172       139        60
OIR    2025250     91400   19.1900 -116.1100       6.6       171       137        60
OIR    2025250     91400   19.1900 -116.1200       6.6       171       135        60
OIR    2025250     91400   19.1900 -116.1300       6.6       171       133        60
OIR    2025250     91400   19.1900 -116.1400       6.6       171       132        60
OIR    2025250     91400   19.1900 -116.1500       6.6       171       132        60
OIR    2025250     91400   19.1900 -116.1600       6.6       171       132        60
OIR    2025250     91400   19.1900 -116.1700       6.6       171       133        60
OIR    2025250     91400   19.1900 -116.1800       6.6       171       136        60
OIR    2025250     91400   19.1900 -116.1900       6.5       171       138        60
OIR    2025250     91400   19.1900 -116.2000       6.5       171       137        60
OIR    2025250     91400   19.1900 -116.2100       6.5       171       136        60
OIR    2025250     91400   19.1900 -116.2200       6.4       171       136        60
OIR    2025250     91400   19.1900 -116.2300       6.2       170       137        60
OIR    2025250     91400   19.1900 -116.2400       5.8       168       138        60
OIR    2025250     91400   19.1900 -116.2500       5.4       166       141        60
OIR    2025250     91400   19.1800 -111.4800       9.6        58       142        60
OIR    2025250     91400   19.1800 -111.4900       9.7        60       138        60
OIR    2025250     91400   19.1800 -111.5000       9.8        62       136        60
OIR    2025250     91400   19.1800 -111.5100       9.9        64       135        60
OIR    2025250     91400   19.1800 -111.5200      10.0        65       135        60
OIR    2025250     91400   19.1800 -111.5300      10.1        65       135        60
OIR    2025250     91400   19.1800 -111.5400      10.1        65       134        60
OIR    2025250     91400   19.1800 -111.5500      10.2        66       134        60
OIR    2025250     91400   19.1800 -111.5600      10.2        66       137        60
OIR    2025250     91400   19.1800 -111.5700      10.2        66       140        60
OIR    2025250     91400   19.1800 -111.5800      10.2        66       140        60
OIR    2025250     91400   19.1800 -111.5900      10.3        65       139        60
OIR    2025250     91400   19.1800 -111.6000      10.8        66       141        60
OIR    2025250     91400   19.1800 -112.9000       8.1       154       142        60
OIR    2025250     91400   19.1800 -112.9100       8.1       156       140        60
OIR    2025250     91400   19.1800 -112.9200       8.1       158       139        60
OIR    2025250     91400   19.1800 -112.9300       8.0       161       138        60
OIR    2025250     91400   19.1800 -112.9400       8.0       165       138        60
OIR    2025250     91400   19.1800 -112.9500       8.0       168       138        60
OIR    2025250     91400   19.1800 -112.9600       8.0       171       139        60
OIR    2025250     91400   19.1800 -112.9700       7.9       172       140        60
OIR    2025250     91400   19.1800 -112.9800       7.9       173       141        60
OIR    2025250     91400   19.1800 -113.0100       7.9       174       140        60
OIR    2025250     91400   19.1800 -113.0200       7.9       174       138        60
OIR    2025250     91400   19.1800 -113.0300       7.9       174       138        60
OIR    2025250     91400   19.1800 -113.0400       7.9       174       139        60
OIR    2025250     91400   19.1800 -113.0500       7.9       175       135        60
OIR    2025250     91400   19.1800 -113.0600       7.9       175       130        60
OIR    2025250     91400   19.1800 -113.0700       7.9       175       126        60
OIR    2025250     91400   19.1800 -113.0800       7.9       175       128        60
OIR    2025250     91400   19.1800 -113.0900       7.9       175       129        60
OIR    2025250     91400   19.1800 -113.1000       7.9       175       126        60
OIR    2025250     91400   19.1800 -113.1100       7.9       175       122        60
OIR    2025250     91400   19.1800 -113.1200       7.9       175       122        60
OIR    2025250     91400   19.1800 -113.1300       7.9       175       122        60
OIR    2025250     91400   19.1800 -113.1400       7.9       175       122        60
OIR    2025250     91400   19.1800 -113.1500       7.9       175       122        60
OIR    2025250     91400   19.1800 -113.1600       7.9       175       122        60
OIR    2025250     91400   19.1800 -113.1700       7.9       175       119        60
OIR    2025250     91400   19.1800 -113.1800       7.9       176       116        60
OIR    2025250     91400   19.1800 -113.1900       7.9       176       116        60
OIR    2025250     91400   19.1800 -113.2000       7.9       176       115        60
OIR    2025250     91400   19.1800 -113.2100       8.0       176       114        60
OIR    2025250     91400   19.1800 -113.2200       8.0       176       114        60
OIR    2025250     91400   19.1800 -113.2300       8.0       176       113        60
OIR    2025250     91400   19.1800 -113.2400       8.0       176       112        60
OIR    2025250     91400   19.1800 -113.2500       8.0       176       112        60
OIR    2025250     91400   19.1800 -113.2600       8.0       176       111        60
OIR    2025250     91400   19.1800 -113.2700       8.0       176       111        60
OIR    2025250     91400   19.1800 -113.2800       8.0       176       110        60
OIR    2025250     91400   19.1800 -113.2900       8.1       176       109        60
OIR    2025250     91400   19.1800 -113.3000       8.1       176       108        60
OIR    2025250     91400   19.1800 -113.3100       8.1       176       108        60
OIR    2025250     91400   19.1800 -113.3200       8.1       176       107        60
OIR    2025250     91400   19.1800 -113.3300       8.1       176       107        60
OIR    2025250     91400   19.1800 -113.3400       8.2       176       107        60
OIR    2025250     91400   19.1800 -113.3500       8.2       176       107        60
OIR    2025250     91400   19.1800 -113.3600       8.2       176       105        60
OIR    2025250     91400   19.1800 -113.3700       8.2       176       105        60
OIR    2025250     91400   19.1800 -113.3800       8.3       176       105        60
OIR    2025250     91400   19.1800 -113.3900       8.3       176       105        60
OIR    2025250     91400   19.1800 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.1800 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.1800 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.1800 -113.4300       8.5       176       104        60
OIR    2025250     91400   19.1800 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.1800 -113.4500       8.5       176       104        60
OIR    2025250     91400   19.1800 -113.4600       8.6       176       103        60
OIR    2025250     91400   19.1800 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.1800 -113.4800       8.6       176       105        60
OIR    2025250     91400   19.1800 -113.4900       8.6       176       105        60
OIR    2025250     91400   19.1800 -113.5000       8.7       176       105        60
OIR    2025250     91400   19.1800 -113.5100       8.7       176       107        60
OIR    2025250     91400   19.1800 -113.5200       8.7       176       107        60
OIR    2025250     91400   19.1800 -113.5300       8.7       176       107        60
OIR    2025250     91400   19.1800 -113.5400       8.8       176       107        60
OIR    2025250     91400   19.1800 -113.5500       8.8       176       108        60
OIR    2025250     91400   19.1800 -113.5600       8.9       177       108        60
OIR    2025250     91400   19.1800 -113.5700       8.9       177       108        60
OIR    2025250     91400   19.1800 -113.5800       8.9       177       109        60
OIR    2025250     91400   19.1800 -113.5900       8.9       177       110        60
OIR    2025250     91400   19.1800 -113.6000       9.0       177       110        60
OIR    2025250     91400   19.1800 -113.6100       9.0       177       110        60
OIR    2025250     91400   19.1800 -113.6200       9.1       177       110        60
OIR    2025250     91400   19.1800 -113.6300       9.1       177       110        60
OIR    2025250     91400   19.1800 -113.6400       9.1       178       110        60
OIR    2025250     91400   19.1800 -113.6500       9.2       178       111        60
OIR    2025250     91400   19.1800 -113.6600       9.2       178       112        60
OIR    2025250     91400   19.1800 -113.6700       9.2       178       112        60
OIR    2025250     91400   19.1800 -113.6800       9.2       178       112        60
OIR    2025250     91400   19.1800 -113.6900       9.3       178       111        60
OIR    2025250     91400   19.1800 -113.7000       9.4       179       112        60
OIR    2025250     91400   19.1800 -113.7100       9.4       179       113        60
OIR    2025250     91400   19.1800 -113.7200       9.5       179       113        60
OIR    2025250     91400   19.1800 -113.7300       9.5       180       113        60
OIR    2025250     91400   19.1800 -113.7400       9.6       180       112        60
OIR    2025250     91400   19.1800 -113.7500       9.6       180       110        60
OIR    2025250     91400   19.1800 -113.7600       9.7       180       110        60
OIR    2025250     91400   19.1800 -113.7700       9.7       181       109        60
OIR    2025250     91400   19.1800 -113.7800       9.8       181       109        60
OIR    2025250     91400   19.1800 -113.7900       9.9       181       110        60
OIR    2025250     91400   19.1800 -113.8000       9.9       182       111        60
OIR    2025250     91400   19.1800 -113.8100      10.0       182       111        60
OIR    2025250     91400   19.1800 -113.8200      10.0       182       112        60
OIR    2025250     91400   19.1800 -113.8300      10.1       182       112        60
OIR    2025250     91400   19.1800 -113.8400      10.1       183       112        60
OIR    2025250     91400   19.1800 -113.8500      10.2       183       111        60
OIR    2025250     91400   19.1800 -113.8600      10.3       184       111        60
OIR    2025250     91400   19.1800 -113.8700      10.3       184       110        60
OIR    2025250     91400   19.1800 -113.8800      10.4       185       111        60
OIR    2025250     91400   19.1800 -113.8900      10.4       185       111        60
OIR    2025250     91400   19.1800 -113.9000      10.5       185       112        60
OIR    2025250     91400   19.1800 -113.9100      10.5       185       112        60
OIR    2025250     91400   19.1800 -113.9200      10.5       185       112        60
OIR    2025250     91400   19.1800 -113.9300      10.5       185       113        60
OIR    2025250     91400   19.1800 -113.9400      10.5       185       113        60
OIR    2025250     91400   19.1800 -113.9500      10.5       185       113        60
OIR    2025250     91400   19.1800 -113.9600      10.5       186       113        60
OIR    2025250     91400   19.1800 -113.9700      10.5       186       113        60
OIR    2025250     91400   19.1800 -113.9800      10.6       186       113        60
OIR    2025250     91400   19.1800 -113.9900      10.6       186       113        60
OIR    2025250     91400   19.1800 -114.0000      10.6       186       113        60
OIR    2025250     91400   19.1800 -114.0100      10.6       186       113        60
OIR    2025250     91400   19.1800 -114.0200      10.6       186       113        60
OIR    2025250     91400   19.1800 -114.0300      10.6       186       113        60
OIR    2025250     91400   19.1800 -114.0400      10.6       186       114        60
OIR    2025250     91400   19.1800 -114.0500      10.6       187       114        60
OIR    2025250     91400   19.1800 -114.0600      10.6       187       114        60
OIR    2025250     91400   19.1800 -114.0700      10.6       187       114        60
OIR    2025250     91400   19.1800 -114.0800      10.6       187       113        60
OIR    2025250     91400   19.1800 -114.0900      10.6       187       113        60
OIR    2025250     91400   19.1800 -114.1000      10.6       187       113        60
OIR    2025250     91400   19.1800 -114.1100      10.6       187       114        60
OIR    2025250     91400   19.1800 -114.1200      10.6       187       116        60
OIR    2025250     91400   19.1800 -114.1300      10.6       187       116        60
OIR    2025250     91400   19.1800 -114.1400      10.6       187       117        60
OIR    2025250     91400   19.1800 -114.1500      10.6       187       119        60
OIR    2025250     91400   19.1800 -114.1600      10.6       187       120        60
OIR    2025250     91400   19.1800 -114.1700      10.6       187       121        60
OIR    2025250     91400   19.1800 -114.1800      10.6       187       123        60
OIR    2025250     91400   19.1800 -114.1900      10.6       187       125        60
OIR    2025250     91400   19.1800 -114.2000      10.6       187       126        60
OIR    2025250     91400   19.1800 -114.2100      10.6       187       128        60
OIR    2025250     91400   19.1800 -114.2200      10.6       188       127        60
OIR    2025250     91400   19.1800 -114.2300      10.6       188       126        60
OIR    2025250     91400   19.1800 -114.2400      10.6       188       125        60
OIR    2025250     91400   19.1800 -114.2500      10.6       188       125        60
OIR    2025250     91400   19.1800 -114.2600      10.6       188       124        60
OIR    2025250     91400   19.1800 -114.2700      10.6       188       126        60
OIR    2025250     91400   19.1800 -114.2800      10.6       188       128        60
OIR    2025250     91400   19.1800 -114.2900      10.6       188       132        60
OIR    2025250     91400   19.1800 -114.3000      10.6       188       135        60
OIR    2025250     91400   19.1800 -114.3100      10.7       188       137        60
OIR    2025250     91400   19.1800 -114.3200      10.7       188       138        60
OIR    2025250     91400   19.1800 -114.3300      10.7       188       137        60
OIR    2025250     91400   19.1800 -114.3400      10.7       188       134        60
OIR    2025250     91400   19.1800 -114.3500      10.7       188       132        60
OIR    2025250     91400   19.1800 -114.3600      10.7       188       136        60
OIR    2025250     91400   19.1800 -114.3700      10.8       188       139        60
OIR    2025250     91400   19.1800 -114.3900      10.8       187       140        60
OIR    2025250     91400   19.1800 -114.4000      10.8       187       140        60
OIR    2025250     91400   19.1800 -116.0800       6.5       174       142        60
OIR    2025250     91400   19.1800 -116.0900       6.6       173       140        60
OIR    2025250     91400   19.1800 -116.1000       6.6       172       140        60
OIR    2025250     91400   19.1800 -116.1100       6.6       172       138        60
OIR    2025250     91400   19.1800 -116.1200       6.6       172       135        60
OIR    2025250     91400   19.1800 -116.1300       6.6       171       133        60
OIR    2025250     91400   19.1800 -116.1400       6.6       171       132        60
OIR    2025250     91400   19.1800 -116.1500       6.6       171       131        60
OIR    2025250     91400   19.1800 -116.1600       6.6       171       132        60
OIR    2025250     91400   19.1800 -116.1700       6.6       171       134        60
OIR    2025250     91400   19.1800 -116.1800       6.6       171       136        60
OIR    2025250     91400   19.1800 -116.1900       6.5       171       139        60
OIR    2025250     91400   19.1800 -116.2000       6.5       171       139        60
OIR    2025250     91400   19.1800 -116.2100       6.5       171       138        60
OIR    2025250     91400   19.1800 -116.2200       6.4       171       138        60
OIR    2025250     91400   19.1800 -116.2300       6.3       171       140        60
OIR    2025250     91400   19.1800 -116.2400       6.0       170       141        60
OIR    2025250     91400   19.1700 -111.1000      11.5        59       141        60
OIR    2025250     91400   19.1700 -111.4800       9.6        60       142        60
OIR    2025250     91400   19.1700 -111.4900       9.7        62       138        60
OIR    2025250     91400   19.1700 -111.5000       9.8        64       135        60
OIR    2025250     91400   19.1700 -111.5100       9.9        65       134        60
OIR    2025250     91400   19.1700 -111.5200       9.9        65       134        60
OIR    2025250     91400   19.1700 -111.5300      10.0        66       134        60
OIR    2025250     91400   19.1700 -111.5400      10.1        66       134        60
OIR    2025250     91400   19.1700 -111.5500      10.1        66       133        60
OIR    2025250     91400   19.1700 -111.5600      10.1        66       135        60
OIR    2025250     91400   19.1700 -111.5700      10.2        66       138        60
OIR    2025250     91400   19.1700 -111.5800      10.2        66       140        60
OIR    2025250     91400   19.1700 -111.5900      10.3        66       141        60
OIR    2025250     91400   19.1700 -112.9100       8.0       156       142        60
OIR    2025250     91400   19.1700 -112.9200       7.9       158       141        60
OIR    2025250     91400   19.1700 -112.9300       7.9       160       140        60
OIR    2025250     91400   19.1700 -112.9400       7.9       164       140        60
OIR    2025250     91400   19.1700 -112.9500       8.0       168       139        60
OIR    2025250     91400   19.1700 -112.9600       7.9       171       140        60
OIR    2025250     91400   19.1700 -112.9700       7.9       172       142        60
OIR    2025250     91400   19.1700 -113.0100       7.9       174       141        60
OIR    2025250     91400   19.1700 -113.0200       7.9       174       140        60
OIR    2025250     91400   19.1700 -113.0300       7.9       174       139        60
OIR    2025250     91400   19.1700 -113.0400       7.9       174       138        60
OIR    2025250     91400   19.1700 -113.0500       7.9       175       135        60
OIR    2025250     91400   19.1700 -113.0600       7.9       175       131        60
OIR    2025250     91400   19.1700 -113.0700       7.9       175       128        60
OIR    2025250     91400   19.1700 -113.0800       7.9       175       128        60
OIR    2025250     91400   19.1700 -113.0900       7.9       175       129        60
OIR    2025250     91400   19.1700 -113.1000       7.9       175       126        60
OIR    2025250     91400   19.1700 -113.1100       7.9       175       123        60
OIR    2025250     91400   19.1700 -113.1200       7.9       175       122        60
OIR    2025250     91400   19.1700 -113.1300       7.9       175       123        60
OIR    2025250     91400   19.1700 -113.1400       7.9       175       123        60
OIR    2025250     91400   19.1700 -113.1500       7.9       175       124        60
OIR    2025250     91400   19.1700 -113.1600       7.9       175       124        60
OIR    2025250     91400   19.1700 -113.1700       7.9       175       122        60
OIR    2025250     91400   19.1700 -113.1800       7.9       176       119        60
OIR    2025250     91400   19.1700 -113.1900       7.9       176       116        60
OIR    2025250     91400   19.1700 -113.2000       7.9       176       115        60
OIR    2025250     91400   19.1700 -113.2100       8.0       176       114        60
OIR    2025250     91400   19.1700 -113.2200       8.0       176       114        60
OIR    2025250     91400   19.1700 -113.2300       8.0       176       114        60
OIR    2025250     91400   19.1700 -113.2400       8.0       176       113        60
OIR    2025250     91400   19.1700 -113.2500       8.0       176       112        60
OIR    2025250     91400   19.1700 -113.2600       8.0       176       111        60
OIR    2025250     91400   19.1700 -113.2700       8.0       176       111        60
OIR    2025250     91400   19.1700 -113.2800       8.0       176       110        60
OIR    2025250     91400   19.1700 -113.2900       8.1       176       109        60
OIR    2025250     91400   19.1700 -113.3000       8.1       176       108        60
OIR    2025250     91400   19.1700 -113.3100       8.1       176       107        60
OIR    2025250     91400   19.1700 -113.3200       8.1       176       107        60
OIR    2025250     91400   19.1700 -113.3300       8.1       176       107        60
OIR    2025250     91400   19.1700 -113.3400       8.2       176       108        60
OIR    2025250     91400   19.1700 -113.3500       8.2       176       107        60
OIR    2025250     91400   19.1700 -113.3600       8.2       176       105        60
OIR    2025250     91400   19.1700 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.1700 -113.3800       8.3       176       104        60
OIR    2025250     91400   19.1700 -113.3900       8.3       176       105        60
OIR    2025250     91400   19.1700 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.1700 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.1700 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.1700 -113.4300       8.5       176       104        60
OIR    2025250     91400   19.1700 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.1700 -113.4500       8.6       176       104        60
OIR    2025250     91400   19.1700 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.1700 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.1700 -113.4800       8.6       176       104        60
OIR    2025250     91400   19.1700 -113.4900       8.6       176       104        60
OIR    2025250     91400   19.1700 -113.5000       8.7       176       105        60
OIR    2025250     91400   19.1700 -113.5100       8.7       176       105        60
OIR    2025250     91400   19.1700 -113.5200       8.7       176       107        60
OIR    2025250     91400   19.1700 -113.5300       8.7       176       107        60
OIR    2025250     91400   19.1700 -113.5400       8.8       176       107        60
OIR    2025250     91400   19.1700 -113.5500       8.8       176       108        60
OIR    2025250     91400   19.1700 -113.5600       8.9       177       108        60
OIR    2025250     91400   19.1700 -113.5700       8.9       177       108        60
OIR    2025250     91400   19.1700 -113.5800       8.9       177       108        60
OIR    2025250     91400   19.1700 -113.5900       9.0       177       109        60
OIR    2025250     91400   19.1700 -113.6000       9.0       177       110        60
OIR    2025250     91400   19.1700 -113.6100       9.0       177       110        60
OIR    2025250     91400   19.1700 -113.6200       9.1       177       109        60
OIR    2025250     91400   19.1700 -113.6300       9.1       177       110        60
OIR    2025250     91400   19.1700 -113.6400       9.1       178       110        60
OIR    2025250     91400   19.1700 -113.6500       9.2       178       111        60
OIR    2025250     91400   19.1700 -113.6600       9.2       178       111        60
OIR    2025250     91400   19.1700 -113.6700       9.2       178       112        60
OIR    2025250     91400   19.1700 -113.6800       9.2       178       111        60
OIR    2025250     91400   19.1700 -113.6900       9.3       178       111        60
OIR    2025250     91400   19.1700 -113.7000       9.4       179       111        60
OIR    2025250     91400   19.1700 -113.7100       9.4       179       112        60
OIR    2025250     91400   19.1700 -113.7200       9.5       179       112        60
OIR    2025250     91400   19.1700 -113.7300       9.5       180       112        60
OIR    2025250     91400   19.1700 -113.7400       9.6       180       111        60
OIR    2025250     91400   19.1700 -113.7500       9.7       180       110        60
OIR    2025250     91400   19.1700 -113.7600       9.8       181       109        60
OIR    2025250     91400   19.1700 -113.7700       9.8       181       109        60
OIR    2025250     91400   19.1700 -113.7800       9.9       181       110        60
OIR    2025250     91400   19.1700 -113.7900      10.0       182       110        60
OIR    2025250     91400   19.1700 -113.8000      10.0       182       110        60
OIR    2025250     91400   19.1700 -113.8100      10.1       182       111        60
OIR    2025250     91400   19.1700 -113.8200      10.1       183       112        60
OIR    2025250     91400   19.1700 -113.8300      10.2       183       112        60
OIR    2025250     91400   19.1700 -113.8400      10.2       183       112        60
OIR    2025250     91400   19.1700 -113.8500      10.3       184       112        60
OIR    2025250     91400   19.1700 -113.8600      10.4       184       111        60
OIR    2025250     91400   19.1700 -113.8700      10.4       185       110        60
OIR    2025250     91400   19.1700 -113.8800      10.5       185       111        60
OIR    2025250     91400   19.1700 -113.8900      10.5       185       112        60
OIR    2025250     91400   19.1700 -113.9000      10.5       185       113        60
OIR    2025250     91400   19.1700 -113.9100      10.5       185       113        60
OIR    2025250     91400   19.1700 -113.9200      10.5       185       113        60
OIR    2025250     91400   19.1700 -113.9300      10.5       185       114        60
OIR    2025250     91400   19.1700 -113.9400      10.6       185       115        60
OIR    2025250     91400   19.1700 -113.9500      10.6       186       114        60
OIR    2025250     91400   19.1700 -113.9600      10.6       186       113        60
OIR    2025250     91400   19.1700 -113.9700      10.6       186       112        60
OIR    2025250     91400   19.1700 -113.9800      10.6       186       112        60
OIR    2025250     91400   19.1700 -113.9900      10.6       186       113        60
OIR    2025250     91400   19.1700 -114.0000      10.6       186       113        60
OIR    2025250     91400   19.1700 -114.0100      10.6       186       113        60
OIR    2025250     91400   19.1700 -114.0200      10.6       186       114        60
OIR    2025250     91400   19.1700 -114.0300      10.6       186       114        60
OIR    2025250     91400   19.1700 -114.0400      10.6       187       114        60
OIR    2025250     91400   19.1700 -114.0500      10.6       187       114        60
OIR    2025250     91400   19.1700 -114.0600      10.7       187       114        60
OIR    2025250     91400   19.1700 -114.0700      10.7       187       114        60
OIR    2025250     91400   19.1700 -114.0800      10.7       187       114        60
OIR    2025250     91400   19.1700 -114.0900      10.7       187       113        60
OIR    2025250     91400   19.1700 -114.1000      10.7       187       112        60
OIR    2025250     91400   19.1700 -114.1100      10.7       187       114        60
OIR    2025250     91400   19.1700 -114.1200      10.7       187       116        60
OIR    2025250     91400   19.1700 -114.1300      10.7       187       116        60
OIR    2025250     91400   19.1700 -114.1400      10.7       187       116        60
OIR    2025250     91400   19.1700 -114.1500      10.7       187       116        60
OIR    2025250     91400   19.1700 -114.1600      10.6       187       119        60
OIR    2025250     91400   19.1700 -114.1700      10.6       187       121        60
OIR    2025250     91400   19.1700 -114.1800      10.6       187       123        60
OIR    2025250     91400   19.1700 -114.1900      10.6       187       125        60
OIR    2025250     91400   19.1700 -114.2000      10.6       187       125        60
OIR    2025250     91400   19.1700 -114.2100      10.6       187       125        60
OIR    2025250     91400   19.1700 -114.2200      10.6       188       127        60
OIR    2025250     91400   19.1700 -114.2300      10.6       188       128        60
OIR    2025250     91400   19.1700 -114.2400      10.6       188       130        60
OIR    2025250     91400   19.1700 -114.2500      10.6       188       130        60
OIR    2025250     91400   19.1700 -114.2600      10.6       188       131        60
OIR    2025250     91400   19.1700 -114.2700      10.6       188       131        60
OIR    2025250     91400   19.1700 -114.2800      10.6       188       131        60
OIR    2025250     91400   19.1700 -114.2900      10.7       188       133        60
OIR    2025250     91400   19.1700 -114.3000      10.7       188       136        60
OIR    2025250     91400   19.1700 -114.3100      10.7       188       138        60
OIR    2025250     91400   19.1700 -114.3200      10.7       188       138        60
OIR    2025250     91400   19.1700 -114.3300      10.7       188       137        60
OIR    2025250     91400   19.1700 -114.3400      10.7       188       136        60
OIR    2025250     91400   19.1700 -114.3500      10.8       188       135        60
OIR    2025250     91400   19.1700 -114.3600      10.8       188       138        60
OIR    2025250     91400   19.1700 -114.3700      10.8       188       141        60
OIR    2025250     91400   19.1700 -114.4000      10.8       187       140        60
OIR    2025250     91400   19.1700 -116.0600       6.4       178       143        60
OIR    2025250     91400   19.1700 -116.0700       6.5       177       141        60
OIR    2025250     91400   19.1700 -116.0800       6.5       176       139        60
OIR    2025250     91400   19.1700 -116.0900       6.6       175       139        60
OIR    2025250     91400   19.1700 -116.1000       6.6       174       140        60
OIR    2025250     91400   19.1700 -116.1100       6.7       173       139        60
OIR    2025250     91400   19.1700 -116.1200       6.7       173       135        60
OIR    2025250     91400   19.1700 -116.1300       6.7       172       133        60
OIR    2025250     91400   19.1700 -116.1400       6.7       172       132        60
OIR    2025250     91400   19.1700 -116.1500       6.6       171       131        60
OIR    2025250     91400   19.1700 -116.1600       6.6       171       132        60
OIR    2025250     91400   19.1700 -116.1700       6.6       171       133        60
OIR    2025250     91400   19.1700 -116.1800       6.6       171       136        60
OIR    2025250     91400   19.1700 -116.1900       6.5       171       139        60
OIR    2025250     91400   19.1700 -116.2000       6.5       171       140        60
OIR    2025250     91400   19.1700 -116.2100       6.5       171       141        60
OIR    2025250     91400   19.1700 -116.2200       6.4       171       142        60
OIR    2025250     91400   19.1700 -117.4100       4.4        30       144        60
OIR    2025250     91400   19.1700 -117.4200       4.5        31       143        60
OIR    2025250     91400   19.1700 -117.4300       4.6        31       142        60
OIR    2025250     91400   19.1700 -117.4400       4.6        31       143        60
OIR    2025250     91400   19.1700 -117.4500       4.5        32       143        60
OIR    2025250     91400   19.1700 -117.4600       4.5        32       145        60
OIR    2025250     91400   19.1600 -111.0800      10.9        57       139        60
OIR    2025250     91400   19.1600 -111.0900      11.3        59       139        60
OIR    2025250     91400   19.1600 -111.1000      11.5        59       139        60
OIR    2025250     91400   19.1600 -111.1100      11.5        59       141        60
OIR    2025250     91400   19.1600 -111.4800       9.6        62       141        60
OIR    2025250     91400   19.1600 -111.4900       9.7        64       138        60
OIR    2025250     91400   19.1600 -111.5000       9.8        65       135        60
OIR    2025250     91400   19.1600 -111.5100       9.8        66       133        60
OIR    2025250     91400   19.1600 -111.5200       9.9        66       133        60
OIR    2025250     91400   19.1600 -111.5300      10.0        66       133        60
OIR    2025250     91400   19.1600 -111.5400      10.0        66       133        60
OIR    2025250     91400   19.1600 -111.5500      10.1        66       133        60
OIR    2025250     91400   19.1600 -111.5600      10.1        66       134        60
OIR    2025250     91400   19.1600 -111.5700      10.2        66       136        60
OIR    2025250     91400   19.1600 -111.5800      10.2        66       139        60
OIR    2025250     91400   19.1600 -112.9400       7.8       163       141        60
OIR    2025250     91400   19.1600 -112.9500       7.9       167       140        60
OIR    2025250     91400   19.1600 -112.9600       7.9       170       141        60
OIR    2025250     91400   19.1600 -113.0000       7.9       174       142        60
OIR    2025250     91400   19.1600 -113.0100       7.9       174       141        60
OIR    2025250     91400   19.1600 -113.0200       7.9       174       139        60
OIR    2025250     91400   19.1600 -113.0300       7.9       174       138        60
OIR    2025250     91400   19.1600 -113.0400       7.9       174       137        60
OIR    2025250     91400   19.1600 -113.0500       7.9       175       135        60
OIR    2025250     91400   19.1600 -113.0600       7.9       175       133        60
OIR    2025250     91400   19.1600 -113.0700       7.9       175       131        60
OIR    2025250     91400   19.1600 -113.0800       7.9       175       130        60
OIR    2025250     91400   19.1600 -113.0900       7.9       175       129        60
OIR    2025250     91400   19.1600 -113.1000       7.9       175       127        60
OIR    2025250     91400   19.1600 -113.1100       7.9       175       124        60
OIR    2025250     91400   19.1600 -113.1200       7.9       175       121        60
OIR    2025250     91400   19.1600 -113.1300       7.9       175       121        60
OIR    2025250     91400   19.1600 -113.1400       7.9       175       121        60
OIR    2025250     91400   19.1600 -113.1500       7.9       175       123        60
OIR    2025250     91400   19.1600 -113.1600       7.9       175       124        60
OIR    2025250     91400   19.1600 -113.1700       7.9       175       122        60
OIR    2025250     91400   19.1600 -113.1800       7.9       176       119        60
OIR    2025250     91400   19.1600 -113.1900       7.9       176       116        60
OIR    2025250     91400   19.1600 -113.2000       7.9       176       116        60
OIR    2025250     91400   19.1600 -113.2100       8.0       176       114        60
OIR    2025250     91400   19.1600 -113.2200       8.0       176       114        60
OIR    2025250     91400   19.1600 -113.2300       8.0       176       113        60
OIR    2025250     91400   19.1600 -113.2400       8.0       176       113        60
OIR    2025250     91400   19.1600 -113.2500       8.0       176       112        60
OIR    2025250     91400   19.1600 -113.2600       8.0       176       111        60
OIR    2025250     91400   19.1600 -113.2700       8.0       176       111        60
OIR    2025250     91400   19.1600 -113.2800       8.1       176       110        60
OIR    2025250     91400   19.1600 -113.2900       8.1       176       109        60
OIR    2025250     91400   19.1600 -113.3000       8.1       176       108        60
OIR    2025250     91400   19.1600 -113.3100       8.1       176       108        60
OIR    2025250     91400   19.1600 -113.3200       8.1       176       107        60
OIR    2025250     91400   19.1600 -113.3300       8.1       176       107        60
OIR    2025250     91400   19.1600 -113.3400       8.2       176       108        60
OIR    2025250     91400   19.1600 -113.3500       8.2       176       107        60
OIR    2025250     91400   19.1600 -113.3600       8.2       176       105        60
OIR    2025250     91400   19.1600 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.1600 -113.3800       8.3       176       104        60
OIR    2025250     91400   19.1600 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.1600 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.1600 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.1600 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.1600 -113.4300       8.5       176       103        60
OIR    2025250     91400   19.1600 -113.4400       8.5       176       103        60
OIR    2025250     91400   19.1600 -113.4500       8.6       176       104        60
OIR    2025250     91400   19.1600 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.1600 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.1600 -113.4800       8.6       176       104        60
OIR    2025250     91400   19.1600 -113.4900       8.6       176       104        60
OIR    2025250     91400   19.1600 -113.5000       8.7       176       104        60
OIR    2025250     91400   19.1600 -113.5100       8.7       176       105        60
OIR    2025250     91400   19.1600 -113.5200       8.7       176       105        60
OIR    2025250     91400   19.1600 -113.5300       8.7       176       107        60
OIR    2025250     91400   19.1600 -113.5400       8.8       176       107        60
OIR    2025250     91400   19.1600 -113.5500       8.8       176       108        60
OIR    2025250     91400   19.1600 -113.5600       8.9       177       108        60
OIR    2025250     91400   19.1600 -113.5700       8.9       177       108        60
OIR    2025250     91400   19.1600 -113.5800       9.0       177       109        60
OIR    2025250     91400   19.1600 -113.5900       9.0       177       109        60
OIR    2025250     91400   19.1600 -113.6000       9.0       177       110        60
OIR    2025250     91400   19.1600 -113.6100       9.1       177       110        60
OIR    2025250     91400   19.1600 -113.6200       9.1       177       109        60
OIR    2025250     91400   19.1600 -113.6300       9.1       177       110        60
OIR    2025250     91400   19.1600 -113.6400       9.2       178       110        60
OIR    2025250     91400   19.1600 -113.6500       9.2       178       111        60
OIR    2025250     91400   19.1600 -113.6600       9.2       178       111        60
OIR    2025250     91400   19.1600 -113.6700       9.2       178       112        60
OIR    2025250     91400   19.1600 -113.6800       9.3       178       111        60
OIR    2025250     91400   19.1600 -113.6900       9.3       178       110        60
OIR    2025250     91400   19.1600 -113.7000       9.4       179       110        60
OIR    2025250     91400   19.1600 -113.7100       9.4       179       110        60
OIR    2025250     91400   19.1600 -113.7200       9.5       180       110        60
OIR    2025250     91400   19.1600 -113.7300       9.6       180       110        60
OIR    2025250     91400   19.1600 -113.7400       9.7       180       110        60
OIR    2025250     91400   19.1600 -113.7500       9.8       181       109        60
OIR    2025250     91400   19.1600 -113.7600       9.8       181       109        60
OIR    2025250     91400   19.1600 -113.7700       9.9       181       110        60
OIR    2025250     91400   19.1600 -113.7800      10.0       182       111        60
OIR    2025250     91400   19.1600 -113.7900      10.0       182       112        60
OIR    2025250     91400   19.1600 -113.8000      10.1       182       112        60
OIR    2025250     91400   19.1600 -113.8100      10.1       183       112        60
OIR    2025250     91400   19.1600 -113.8200      10.2       183       111        60
OIR    2025250     91400   19.1600 -113.8300      10.2       183       111        60
OIR    2025250     91400   19.1600 -113.8400      10.3       184       111        60
OIR    2025250     91400   19.1600 -113.8500      10.4       184       111        60
OIR    2025250     91400   19.1600 -113.8600      10.4       184       111        60
OIR    2025250     91400   19.1600 -113.8700      10.5       185       111        60
OIR    2025250     91400   19.1600 -113.8800      10.5       185       111        60
OIR    2025250     91400   19.1600 -113.8900      10.5       185       112        60
OIR    2025250     91400   19.1600 -113.9000      10.5       185       112        60
OIR    2025250     91400   19.1600 -113.9100      10.5       185       113        60
OIR    2025250     91400   19.1600 -113.9200      10.6       185       114        60
OIR    2025250     91400   19.1600 -113.9300      10.6       185       114        60
OIR    2025250     91400   19.1600 -113.9400      10.6       186       114        60
OIR    2025250     91400   19.1600 -113.9500      10.6       186       114        60
OIR    2025250     91400   19.1600 -113.9600      10.6       186       113        60
OIR    2025250     91400   19.1600 -113.9700      10.6       186       112        60
OIR    2025250     91400   19.1600 -113.9800      10.6       186       113        60
OIR    2025250     91400   19.1600 -113.9900      10.6       186       113        60
OIR    2025250     91400   19.1600 -114.0000      10.6       186       113        60
OIR    2025250     91400   19.1600 -114.0100      10.6       186       114        60
OIR    2025250     91400   19.1600 -114.0200      10.7       186       114        60
OIR    2025250     91400   19.1600 -114.0300      10.7       187       114        60
OIR    2025250     91400   19.1600 -114.0400      10.7       187       114        60
OIR    2025250     91400   19.1600 -114.0500      10.7       187       114        60
OIR    2025250     91400   19.1600 -114.0600      10.7       187       114        60
OIR    2025250     91400   19.1600 -114.0700      10.7       187       114        60
OIR    2025250     91400   19.1600 -114.0800      10.7       187       114        60
OIR    2025250     91400   19.1600 -114.0900      10.7       187       113        60
OIR    2025250     91400   19.1600 -114.1000      10.7       187       112        60
OIR    2025250     91400   19.1600 -114.1100      10.7       187       114        60
OIR    2025250     91400   19.1600 -114.1200      10.7       187       116        60
OIR    2025250     91400   19.1600 -114.1300      10.7       187       116        60
OIR    2025250     91400   19.1600 -114.1400      10.7       187       116        60
OIR    2025250     91400   19.1600 -114.1500      10.7       187       116        60
OIR    2025250     91400   19.1600 -114.1600      10.7       187       117        60
OIR    2025250     91400   19.1600 -114.1700      10.7       187       121        60
OIR    2025250     91400   19.1600 -114.1800      10.7       187       123        60
OIR    2025250     91400   19.1600 -114.1900      10.7       187       125        60
OIR    2025250     91400   19.1600 -114.2000      10.7       187       125        60
OIR    2025250     91400   19.1600 -114.2100      10.7       187       124        60
OIR    2025250     91400   19.1600 -114.2200      10.7       188       125        60
OIR    2025250     91400   19.1600 -114.2300      10.6       188       130        60
OIR    2025250     91400   19.1600 -114.2400      10.6       188       134        60
OIR    2025250     91400   19.1600 -114.2500      10.6       188       136        60
OIR    2025250     91400   19.1600 -114.2600      10.6       188       137        60
OIR    2025250     91400   19.1600 -114.2700      10.7       188       137        60
OIR    2025250     91400   19.1600 -114.2800      10.7       188       135        60
OIR    2025250     91400   19.1600 -114.2900      10.7       188       134        60
OIR    2025250     91400   19.1600 -114.3000      10.7       188       136        60
OIR    2025250     91400   19.1600 -114.3100      10.7       188       139        60
OIR    2025250     91400   19.1600 -114.3200      10.7       188       137        60
OIR    2025250     91400   19.1600 -114.3300      10.8       188       136        60
OIR    2025250     91400   19.1600 -114.3400      10.8       188       137        60
OIR    2025250     91400   19.1600 -114.3500      10.8       188       138        60
OIR    2025250     91400   19.1600 -114.3600      10.8       188       140        60
OIR    2025250     91400   19.1600 -116.0600       6.5       179       143        60
OIR    2025250     91400   19.1600 -116.0700       6.5       179       140        60
OIR    2025250     91400   19.1600 -116.0800       6.5       178       138        60
OIR    2025250     91400   19.1600 -116.0900       6.6       177       137        60
OIR    2025250     91400   19.1600 -116.1000       6.6       175       137        60
OIR    2025250     91400   19.1600 -116.1100       6.7       174       138        60
OIR    2025250     91400   19.1600 -116.1200       6.7       174       136        60
OIR    2025250     91400   19.1600 -116.1300       6.7       173       134        60
OIR    2025250     91400   19.1600 -116.1400       6.7       172       132        60
OIR    2025250     91400   19.1600 -116.1500       6.7       172       131        60
OIR    2025250     91400   19.1600 -116.1600       6.6       171       132        60
OIR    2025250     91400   19.1600 -116.1700       6.6       171       134        60
OIR    2025250     91400   19.1600 -116.1800       6.6       171       137        60
OIR    2025250     91400   19.1600 -116.1900       6.5       171       140        60
OIR    2025250     91400   19.1600 -116.2000       6.5       171       142        60
OIR    2025250     91400   19.1600 -117.4300       4.2        32       142        60
OIR    2025250     91400   19.1600 -117.4400       4.4        31       143        60
OIR    2025250     91400   19.1500 -110.0700      34.5        14       141        60
OIR    2025250     91400   19.1500 -111.0800      10.3        56       142        60
OIR    2025250     91400   19.1500 -111.0900      11.1        58       142        60
OIR    2025250     91400   19.1500 -111.1000      11.5        59       142        60
OIR    2025250     91400   19.1500 -111.4600       9.5        59       141        60
OIR    2025250     91400   19.1500 -111.4700       9.5        62       140        60
OIR    2025250     91400   19.1500 -111.4800       9.6        64       140        60
OIR    2025250     91400   19.1500 -111.4900       9.7        65       137        60
OIR    2025250     91400   19.1500 -111.5000       9.8        66       134        60
OIR    2025250     91400   19.1500 -111.5100       9.8        66       132        60
OIR    2025250     91400   19.1500 -111.5200       9.9        67       133        60
OIR    2025250     91400   19.1500 -111.5300       9.9        67       133        60
OIR    2025250     91400   19.1500 -111.5400      10.0        67       133        60
OIR    2025250     91400   19.1500 -111.5500      10.1        67       133        60
OIR    2025250     91400   19.1500 -111.5600      10.1        67       135        60
OIR    2025250     91400   19.1500 -111.5700      10.1        67       138        60
OIR    2025250     91400   19.1500 -111.5800      10.2        67       141        60
OIR    2025250     91400   19.1500 -112.9500       7.7       166       142        60
OIR    2025250     91400   19.1500 -112.9600       7.8       170       141        60
OIR    2025250     91400   19.1500 -112.9700       7.8       172       141        60
OIR    2025250     91400   19.1500 -112.9800       7.8       173       141        60
OIR    2025250     91400   19.1500 -112.9900       7.8       174       140        60
OIR    2025250     91400   19.1500 -113.0000       7.8       174       139        60
OIR    2025250     91400   19.1500 -113.0100       7.9       174       138        60
OIR    2025250     91400   19.1500 -113.0200       7.9       174       138        60
OIR    2025250     91400   19.1500 -113.0300       7.9       174       138        60
OIR    2025250     91400   19.1500 -113.0400       7.9       174       136        60
OIR    2025250     91400   19.1500 -113.0500       7.9       175       134        60
OIR    2025250     91400   19.1500 -113.0600       7.9       175       133        60
OIR    2025250     91400   19.1500 -113.0700       7.9       175       132        60
OIR    2025250     91400   19.1500 -113.0800       7.9       175       131        60
OIR    2025250     91400   19.1500 -113.0900       7.9       175       129        60
OIR    2025250     91400   19.1500 -113.1000       7.9       175       127        60
OIR    2025250     91400   19.1500 -113.1100       7.9       175       125        60
OIR    2025250     91400   19.1500 -113.1200       7.9       175       122        60
OIR    2025250     91400   19.1500 -113.1300       7.9       175       121        60
OIR    2025250     91400   19.1500 -113.1400       7.9       175       120        60
OIR    2025250     91400   19.1500 -113.1500       7.9       175       121        60
OIR    2025250     91400   19.1500 -113.1600       7.9       175       123        60
OIR    2025250     91400   19.1500 -113.1700       7.9       175       122        60
OIR    2025250     91400   19.1500 -113.1800       7.9       176       120        60
OIR    2025250     91400   19.1500 -113.1900       7.9       176       117        60
OIR    2025250     91400   19.1500 -113.2000       8.0       176       116        60
OIR    2025250     91400   19.1500 -113.2100       8.0       176       115        60
OIR    2025250     91400   19.1500 -113.2200       8.0       176       114        60
OIR    2025250     91400   19.1500 -113.2300       8.0       176       113        60
OIR    2025250     91400   19.1500 -113.2400       8.0       176       112        60
OIR    2025250     91400   19.1500 -113.2500       8.0       176       112        60
OIR    2025250     91400   19.1500 -113.2600       8.0       176       111        60
OIR    2025250     91400   19.1500 -113.2700       8.0       176       110        60
OIR    2025250     91400   19.1500 -113.2800       8.0       176       109        60
OIR    2025250     91400   19.1500 -113.2900       8.1       176       109        60
OIR    2025250     91400   19.1500 -113.3000       8.1       176       109        60
OIR    2025250     91400   19.1500 -113.3100       8.1       176       108        60
OIR    2025250     91400   19.1500 -113.3200       8.1       176       107        60
OIR    2025250     91400   19.1500 -113.3300       8.1       176       107        60
OIR    2025250     91400   19.1500 -113.3400       8.2       176       107        60
OIR    2025250     91400   19.1500 -113.3500       8.2       176       107        60
OIR    2025250     91400   19.1500 -113.3600       8.2       176       105        60
OIR    2025250     91400   19.1500 -113.3700       8.2       176       104        60
OIR    2025250     91400   19.1500 -113.3800       8.3       176       104        60
OIR    2025250     91400   19.1500 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.1500 -113.4000       8.3       176       104        60
OIR    2025250     91400   19.1500 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.1500 -113.4200       8.4       176       103        60
OIR    2025250     91400   19.1500 -113.4300       8.5       176       103        60
OIR    2025250     91400   19.1500 -113.4400       8.5       176       103        60
OIR    2025250     91400   19.1500 -113.4500       8.6       176       103        60
OIR    2025250     91400   19.1500 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.1500 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.1500 -113.4800       8.6       176       104        60
OIR    2025250     91400   19.1500 -113.4900       8.6       176       104        60
OIR    2025250     91400   19.1500 -113.5000       8.7       176       104        60
OIR    2025250     91400   19.1500 -113.5100       8.7       176       104        60
OIR    2025250     91400   19.1500 -113.5200       8.7       176       105        60
OIR    2025250     91400   19.1500 -113.5300       8.8       176       105        60
OIR    2025250     91400   19.1500 -113.5400       8.8       176       107        60
OIR    2025250     91400   19.1500 -113.5500       8.9       176       108        60
OIR    2025250     91400   19.1500 -113.5600       8.9       177       108        60
OIR    2025250     91400   19.1500 -113.5700       8.9       177       108        60
OIR    2025250     91400   19.1500 -113.5800       9.0       177       108        60
OIR    2025250     91400   19.1500 -113.5900       9.0       177       109        60
OIR    2025250     91400   19.1500 -113.6000       9.0       177       109        60
OIR    2025250     91400   19.1500 -113.6100       9.1       177       110        60
OIR    2025250     91400   19.1500 -113.6200       9.1       177       110        60
OIR    2025250     91400   19.1500 -113.6300       9.1       177       110        60
OIR    2025250     91400   19.1500 -113.6400       9.2       177       110        60
OIR    2025250     91400   19.1500 -113.6500       9.2       178       111        60
OIR    2025250     91400   19.1500 -113.6600       9.2       178       111        60
OIR    2025250     91400   19.1500 -113.6700       9.2       178       111        60
OIR    2025250     91400   19.1500 -113.6800       9.3       178       111        60
OIR    2025250     91400   19.1500 -113.6900       9.3       178       111        60
OIR    2025250     91400   19.1500 -113.7000       9.4       179       111        60
OIR    2025250     91400   19.1500 -113.7100       9.5       179       111        60
OIR    2025250     91400   19.1500 -113.7200       9.6       180       110        60
OIR    2025250     91400   19.1500 -113.7300       9.7       180       110        60
OIR    2025250     91400   19.1500 -113.7400       9.8       181       110        60
OIR    2025250     91400   19.1500 -113.7500       9.8       181       109        60
OIR    2025250     91400   19.1500 -113.7600       9.9       181       109        60
OIR    2025250     91400   19.1500 -113.7700      10.0       182       110        60
OIR    2025250     91400   19.1500 -113.7800      10.0       182       112        60
OIR    2025250     91400   19.1500 -113.7900      10.1       182       113        60
OIR    2025250     91400   19.1500 -113.8000      10.1       182       113        60
OIR    2025250     91400   19.1500 -113.8100      10.2       183       114        60
OIR    2025250     91400   19.1500 -113.8200      10.2       183       112        60
OIR    2025250     91400   19.1500 -113.8300      10.3       183       110        60
OIR    2025250     91400   19.1500 -113.8400      10.4       184       110        60
OIR    2025250     91400   19.1500 -113.8500      10.4       184       110        60
OIR    2025250     91400   19.1500 -113.8600      10.5       185       110        60
OIR    2025250     91400   19.1500 -113.8700      10.5       185       111        60
OIR    2025250     91400   19.1500 -113.8800      10.5       185       112        60
OIR    2025250     91400   19.1500 -113.8900      10.6       185       111        60
OIR    2025250     91400   19.1500 -113.9000      10.6       185       111        60
OIR    2025250     91400   19.1500 -113.9100      10.6       185       113        60
OIR    2025250     91400   19.1500 -113.9200      10.6       185       114        60
OIR    2025250     91400   19.1500 -113.9300      10.6       186       115        60
OIR    2025250     91400   19.1500 -113.9400      10.6       186       113        60
OIR    2025250     91400   19.1500 -113.9500      10.6       186       112        60
OIR    2025250     91400   19.1500 -113.9600      10.6       186       112        60
OIR    2025250     91400   19.1500 -113.9700      10.6       186       112        60
OIR    2025250     91400   19.1500 -113.9800      10.6       186       113        60
OIR    2025250     91400   19.1500 -113.9900      10.7       186       115        60
OIR    2025250     91400   19.1500 -114.0000      10.7       186       115        60
OIR    2025250     91400   19.1500 -114.0100      10.7       186       114        60
OIR    2025250     91400   19.1500 -114.0200      10.7       187       114        60
OIR    2025250     91400   19.1500 -114.0300      10.7       187       114        60
OIR    2025250     91400   19.1500 -114.0400      10.7       187       114        60
OIR    2025250     91400   19.1500 -114.0500      10.7       187       114        60
OIR    2025250     91400   19.1500 -114.0600      10.7       187       114        60
OIR    2025250     91400   19.1500 -114.0700      10.7       187       113        60
OIR    2025250     91400   19.1500 -114.0800      10.7       187       112        60
OIR    2025250     91400   19.1500 -114.0900      10.7       187       112        60
OIR    2025250     91400   19.1500 -114.1000      10.7       187       113        60
OIR    2025250     91400   19.1500 -114.1100      10.7       187       115        60
OIR    2025250     91400   19.1500 -114.1200      10.7       187       116        60
OIR    2025250     91400   19.1500 -114.1300      10.7       187       117        60
OIR    2025250     91400   19.1500 -114.1400      10.7       187       116        60
OIR    2025250     91400   19.1500 -114.1500      10.7       187       116        60
OIR    2025250     91400   19.1500 -114.1600      10.7       187       119        60
OIR    2025250     91400   19.1500 -114.1700      10.7       187       121        60
OIR    2025250     91400   19.1500 -114.1800      10.7       187       124        60
OIR    2025250     91400   19.1500 -114.1900      10.7       187       126        60
OIR    2025250     91400   19.1500 -114.2000      10.7       187       128        60
OIR    2025250     91400   19.1500 -114.2100      10.7       187       128        60
OIR    2025250     91400   19.1500 -114.2200      10.7       188       127        60
OIR    2025250     91400   19.1500 -114.2300      10.7       188       131        60
OIR    2025250     91400   19.1500 -114.2400      10.7       188       134        60
OIR    2025250     91400   19.1500 -114.2500      10.7       188       135        60
OIR    2025250     91400   19.1500 -114.2600      10.7       188       135        60
OIR    2025250     91400   19.1500 -114.2700      10.7       188       135        60
OIR    2025250     91400   19.1500 -114.2800      10.7       188       134        60
OIR    2025250     91400   19.1500 -114.2900      10.7       188       134        60
OIR    2025250     91400   19.1500 -114.3000      10.7       188       135        60
OIR    2025250     91400   19.1500 -114.3100      10.8       188       136        60
OIR    2025250     91400   19.1500 -114.3200      10.8       188       136        60
OIR    2025250     91400   19.1500 -114.3300      10.8       188       136        60
OIR    2025250     91400   19.1500 -114.3400      10.8       188       137        60
OIR    2025250     91400   19.1500 -114.3500      10.8       188       138        60
OIR    2025250     91400   19.1500 -114.3600      10.8       188       140        60
OIR    2025250     91400   19.1500 -114.6700      10.0       186       140        60
OIR    2025250     91400   19.1500 -116.0600       6.6       180       143        60
OIR    2025250     91400   19.1500 -116.0700       6.6       180       140        60
OIR    2025250     91400   19.1500 -116.0800       6.6       179       137        60
OIR    2025250     91400   19.1500 -116.0900       6.7       178       135        60
OIR    2025250     91400   19.1500 -116.1000       6.8       177       135        60
OIR    2025250     91400   19.1500 -116.1100       6.8       176       134        60
OIR    2025250     91400   19.1500 -116.1200       6.8       175       134        60
OIR    2025250     91400   19.1500 -116.1300       6.9       174       135        60
OIR    2025250     91400   19.1500 -116.1400       6.8       173       134        60
OIR    2025250     91400   19.1500 -116.1500       6.8       173       133        60
OIR    2025250     91400   19.1500 -116.1600       6.7       172       133        60
OIR    2025250     91400   19.1500 -116.1700       6.7       172       135        60
OIR    2025250     91400   19.1500 -116.1800       6.6       172       138        60
OIR    2025250     91400   19.1500 -116.1900       6.5       172       143        60
OIR    2025250     91400   19.1500 -117.4800       4.2        37       145        60
OIR    2025250     91400   19.1400 -110.2400       9.4        69       131        60
OIR    2025250     91400   19.1400 -111.4500       9.6        58       141        60
OIR    2025250     91400   19.1400 -111.4600       9.5        60       139        60
OIR    2025250     91400   19.1400 -111.4700       9.5        62       139        60
OIR    2025250     91400   19.1400 -111.4800       9.5        65       138        60
OIR    2025250     91400   19.1400 -111.4900       9.6        66       136        60
OIR    2025250     91400   19.1400 -111.5000       9.7        67       134        60
OIR    2025250     91400   19.1400 -111.5100       9.8        67       132        60
OIR    2025250     91400   19.1400 -111.5200       9.8        67       133        60
OIR    2025250     91400   19.1400 -111.5300       9.9        68       133        60
OIR    2025250     91400   19.1400 -111.5400      10.0        68       134        60
OIR    2025250     91400   19.1400 -111.5500      10.0        68       134        60
OIR    2025250     91400   19.1400 -111.5600      10.1        68       136        60
OIR    2025250     91400   19.1400 -111.5700      10.1        68       139        60
OIR    2025250     91400   19.1400 -112.9700       7.7       172       139        60
OIR    2025250     91400   19.1400 -112.9800       7.8       173       136        60
OIR    2025250     91400   19.1400 -112.9900       7.8       174       136        60
OIR    2025250     91400   19.1400 -113.0000       7.8       174       135        60
OIR    2025250     91400   19.1400 -113.0100       7.8       174       135        60
OIR    2025250     91400   19.1400 -113.0200       7.9       174       136        60
OIR    2025250     91400   19.1400 -113.0300       7.9       174       138        60
OIR    2025250     91400   19.1400 -113.0400       7.9       174       136        60
OIR    2025250     91400   19.1400 -113.0500       7.9       175       134        60
OIR    2025250     91400   19.1400 -113.0600       7.9       175       133        60
OIR    2025250     91400   19.1400 -113.0700       7.9       175       132        60
OIR    2025250     91400   19.1400 -113.0800       7.9       175       130        60
OIR    2025250     91400   19.1400 -113.0900       7.9       175       129        60
OIR    2025250     91400   19.1400 -113.1000       7.9       175       128        60
OIR    2025250     91400   19.1400 -113.1100       7.9       175       126        60
OIR    2025250     91400   19.1400 -113.1200       7.9       175       125        60
OIR    2025250     91400   19.1400 -113.1300       7.9       175       123        60
OIR    2025250     91400   19.1400 -113.1400       7.9       175       121        60
OIR    2025250     91400   19.1400 -113.1500       7.9       175       121        60
OIR    2025250     91400   19.1400 -113.1600       7.9       175       123        60
OIR    2025250     91400   19.1400 -113.1700       7.9       175       123        60
OIR    2025250     91400   19.1400 -113.1800       7.9       176       121        60
OIR    2025250     91400   19.1400 -113.1900       7.9       176       117        60
OIR    2025250     91400   19.1400 -113.2000       8.0       176       116        60
OIR    2025250     91400   19.1400 -113.2100       8.0       176       116        60
OIR    2025250     91400   19.1400 -113.2200       8.0       176       115        60
OIR    2025250     91400   19.1400 -113.2300       8.0       176       114        60
OIR    2025250     91400   19.1400 -113.2400       8.0       176       113        60
OIR    2025250     91400   19.1400 -113.2500       8.0       176       113        60
OIR    2025250     91400   19.1400 -113.2600       8.0       176       112        60
OIR    2025250     91400   19.1400 -113.2700       8.0       176       112        60
OIR    2025250     91400   19.1400 -113.2800       8.0       176       111        60
OIR    2025250     91400   19.1400 -113.2900       8.1       176       110        60
OIR    2025250     91400   19.1400 -113.3000       8.1       176       109        60
OIR    2025250     91400   19.1400 -113.3100       8.1       176       108        60
OIR    2025250     91400   19.1400 -113.3200       8.1       176       108        60
OIR    2025250     91400   19.1400 -113.3300       8.1       176       107        60
OIR    2025250     91400   19.1400 -113.3400       8.2       176       107        60
OIR    2025250     91400   19.1400 -113.3500       8.2       176       107        60
OIR    2025250     91400   19.1400 -113.3600       8.2       176       107        60
OIR    2025250     91400   19.1400 -113.3700       8.2       176       105        60
OIR    2025250     91400   19.1400 -113.3800       8.3       176       105        60
OIR    2025250     91400   19.1400 -113.3900       8.3       176       105        60
OIR    2025250     91400   19.1400 -113.4000       8.3       176       105        60
OIR    2025250     91400   19.1400 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.1400 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.1400 -113.4300       8.5       176       103        60
OIR    2025250     91400   19.1400 -113.4400       8.5       176       103        60
OIR    2025250     91400   19.1400 -113.4500       8.6       176       103        60
OIR    2025250     91400   19.1400 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.1400 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.1400 -113.4800       8.6       176       104        60
OIR    2025250     91400   19.1400 -113.4900       8.6       176       104        60
OIR    2025250     91400   19.1400 -113.5000       8.7       176       104        60
OIR    2025250     91400   19.1400 -113.5100       8.7       176       104        60
OIR    2025250     91400   19.1400 -113.5200       8.7       176       104        60
OIR    2025250     91400   19.1400 -113.5300       8.8       176       105        60
OIR    2025250     91400   19.1400 -113.5400       8.8       176       107        60
OIR    2025250     91400   19.1400 -113.5500       8.9       176       108        60
OIR    2025250     91400   19.1400 -113.5600       8.9       176       108        60
OIR    2025250     91400   19.1400 -113.5700       9.0       177       108        60
OIR    2025250     91400   19.1400 -113.5800       9.0       177       108        60
OIR    2025250     91400   19.1400 -113.5900       9.0       177       108        60
OIR    2025250     91400   19.1400 -113.6000       9.1       177       109        60
OIR    2025250     91400   19.1400 -113.6100       9.1       177       109        60
OIR    2025250     91400   19.1400 -113.6200       9.1       177       110        60
OIR    2025250     91400   19.1400 -113.6300       9.1       177       111        60
OIR    2025250     91400   19.1400 -113.6400       9.2       177       110        60
OIR    2025250     91400   19.1400 -113.6500       9.2       178       110        60
OIR    2025250     91400   19.1400 -113.6600       9.2       178       110        60
OIR    2025250     91400   19.1400 -113.6700       9.2       178       110        60
OIR    2025250     91400   19.1400 -113.6800       9.3       178       111        60
OIR    2025250     91400   19.1400 -113.6900       9.3       178       112        60
OIR    2025250     91400   19.1400 -113.7000       9.4       179       112        60
OIR    2025250     91400   19.1400 -113.7100       9.5       179       112        60
OIR    2025250     91400   19.1400 -113.7200       9.6       180       112        60
OIR    2025250     91400   19.1400 -113.7300       9.7       180       111        60
OIR    2025250     91400   19.1400 -113.7400       9.8       181       111        60
OIR    2025250     91400   19.1400 -113.7500       9.9       181       110        60
OIR    2025250     91400   19.1400 -113.7600      10.0       182       110        60
OIR    2025250     91400   19.1400 -113.7700      10.0       182       111        60
OIR    2025250     91400   19.1400 -113.7800      10.1       182       112        60
OIR    2025250     91400   19.1400 -113.7900      10.1       182       114        60
OIR    2025250     91400   19.1400 -113.8000      10.2       183       114        60
OIR    2025250     91400   19.1400 -113.8100      10.2       183       114        60
OIR    2025250     91400   19.1400 -113.8200      10.3       183       113        60
OIR    2025250     91400   19.1400 -113.8300      10.4       184       111        60
OIR    2025250     91400   19.1400 -113.8400      10.5       184       110        60
OIR    2025250     91400   19.1400 -113.8500      10.5       185       111        60
OIR    2025250     91400   19.1400 -113.8600      10.5       185       111        60
OIR    2025250     91400   19.1400 -113.8700      10.6       185       112        60
OIR    2025250     91400   19.1400 -113.8800      10.6       185       112        60
OIR    2025250     91400   19.1400 -113.8900      10.6       185       112        60
OIR    2025250     91400   19.1400 -113.9000      10.6       185       112        60
OIR    2025250     91400   19.1400 -113.9100      10.6       185       113        60
OIR    2025250     91400   19.1400 -113.9200      10.6       186       114        60
OIR    2025250     91400   19.1400 -113.9300      10.6       186       115        60
OIR    2025250     91400   19.1400 -113.9400      10.6       186       114        60
OIR    2025250     91400   19.1400 -113.9500      10.6       186       114        60
OIR    2025250     91400   19.1400 -113.9600      10.6       186       114        60
OIR    2025250     91400   19.1400 -113.9700      10.6       186       114        60
OIR    2025250     91400   19.1400 -113.9800      10.7       186       114        60
OIR    2025250     91400   19.1400 -113.9900      10.7       186       115        60
OIR    2025250     91400   19.1400 -114.0000      10.7       187       115        60
OIR    2025250     91400   19.1400 -114.0100      10.7       187       114        60
OIR    2025250     91400   19.1400 -114.0200      10.7       187       114        60
OIR    2025250     91400   19.1400 -114.0300      10.7       187       113        60
OIR    2025250     91400   19.1400 -114.0400      10.7       187       113        60
OIR    2025250     91400   19.1400 -114.0500      10.7       187       113        60
OIR    2025250     91400   19.1400 -114.0600      10.7       187       113        60
OIR    2025250     91400   19.1400 -114.0700      10.7       187       113        60
OIR    2025250     91400   19.1400 -114.0800      10.7       187       112        60
OIR    2025250     91400   19.1400 -114.0900      10.7       187       112        60
OIR    2025250     91400   19.1400 -114.1000      10.7       187       114        60
OIR    2025250     91400   19.1400 -114.1100      10.7       187       116        60
OIR    2025250     91400   19.1400 -114.1200      10.7       187       116        60
OIR    2025250     91400   19.1400 -114.1300      10.7       187       117        60
OIR    2025250     91400   19.1400 -114.1400      10.7       187       117        60
OIR    2025250     91400   19.1400 -114.1500      10.7       187       116        60
OIR    2025250     91400   19.1400 -114.1600      10.7       187       119        60
OIR    2025250     91400   19.1400 -114.1700      10.7       187       122        60
OIR    2025250     91400   19.1400 -114.1800      10.7       187       124        60
OIR    2025250     91400   19.1400 -114.1900      10.7       187       126        60
OIR    2025250     91400   19.1400 -114.2000      10.7       187       129        60
OIR    2025250     91400   19.1400 -114.2100      10.7       187       130        60
OIR    2025250     91400   19.1400 -114.2200      10.7       188       130        60
OIR    2025250     91400   19.1400 -114.2300      10.7       188       132        60
OIR    2025250     91400   19.1400 -114.2400      10.7       188       135        60
OIR    2025250     91400   19.1400 -114.2500      10.7       188       135        60
OIR    2025250     91400   19.1400 -114.2600      10.7       188       134        60
OIR    2025250     91400   19.1400 -114.2700      10.7       188       133        60
OIR    2025250     91400   19.1400 -114.2800      10.7       188       132        60
OIR    2025250     91400   19.1400 -114.2900      10.8       188       132        60
OIR    2025250     91400   19.1400 -114.3000      10.8       188       132        60
OIR    2025250     91400   19.1400 -114.3100      10.8       188       133        60
OIR    2025250     91400   19.1400 -114.3200      10.8       188       134        60
OIR    2025250     91400   19.1400 -114.3300      10.8       188       136        60
OIR    2025250     91400   19.1400 -114.3400      10.8       188       138        60
OIR    2025250     91400   19.1400 -114.3500      10.9       188       138        60
OIR    2025250     91400   19.1400 -114.3600      10.9       188       139        60
OIR    2025250     91400   19.1400 -116.0600       6.6       181       143        60
OIR    2025250     91400   19.1400 -116.0700       6.7       180       141        60
OIR    2025250     91400   19.1400 -116.0800       6.7       179       138        60
OIR    2025250     91400   19.1400 -116.0900       6.8       178       136        60
OIR    2025250     91400   19.1400 -116.1000       6.9       177       135        60
OIR    2025250     91400   19.1400 -116.1100       6.9       177       134        60
OIR    2025250     91400   19.1400 -116.1200       7.0       176       134        60
OIR    2025250     91400   19.1400 -116.1300       7.0       175       135        60
OIR    2025250     91400   19.1400 -116.1400       7.0       175       135        60
OIR    2025250     91400   19.1400 -116.1500       6.9       174       134        60
OIR    2025250     91400   19.1400 -116.1600       6.9       173       134        60
OIR    2025250     91400   19.1400 -116.1700       6.7       173       136        60
OIR    2025250     91400   19.1400 -116.1800       6.6       172       139        60
OIR    2025250     91400   19.1400 -116.1900       6.5       173       143        60
OIR    2025250     91400   19.1300 -110.1000      64.1        45       131        60
OIR    2025250     91400   19.1300 -111.4400       9.8        58       139        60
OIR    2025250     91400   19.1300 -111.4500       9.7        60       138        60
OIR    2025250     91400   19.1300 -111.4600       9.5        62       137        60
OIR    2025250     91400   19.1300 -111.4700       9.4        65       137        60
OIR    2025250     91400   19.1300 -111.4800       9.4        67       136        60
OIR    2025250     91400   19.1300 -111.4900       9.5        69       136        60
OIR    2025250     91400   19.1300 -111.5000       9.6        70       135        60
OIR    2025250     91400   19.1300 -111.5100       9.6        70       135        60
OIR    2025250     91400   19.1300 -111.5200       9.7        70       135        60
OIR    2025250     91400   19.1300 -111.5300       9.8        70       136        60
OIR    2025250     91400   19.1300 -111.5400       9.9        70       136        60
OIR    2025250     91400   19.1300 -111.5500      10.0        70       136        60
OIR    2025250     91400   19.1300 -111.5600      10.0        70       137        60
OIR    2025250     91400   19.1300 -111.5700      10.1        69       140        60
OIR    2025250     91400   19.1300 -112.9700       7.5       170       140        60
OIR    2025250     91400   19.1300 -112.9800       7.7       172       138        60
OIR    2025250     91400   19.1300 -112.9900       7.8       173       137        60
OIR    2025250     91400   19.1300 -113.0000       7.8       174       136        60
OIR    2025250     91400   19.1300 -113.0100       7.8       174       136        60
OIR    2025250     91400   19.1300 -113.0200       7.9       174       136        60
OIR    2025250     91400   19.1300 -113.0300       7.9       174       137        60
OIR    2025250     91400   19.1300 -113.0400       7.9       174       136        60
OIR    2025250     91400   19.1300 -113.0500       7.9       175       134        60
OIR    2025250     91400   19.1300 -113.0600       7.9       175       133        60
OIR    2025250     91400   19.1300 -113.0700       7.9       175       131        60
OIR    2025250     91400   19.1300 -113.0800       7.9       175       130        60
OIR    2025250     91400   19.1300 -113.0900       7.9       175       129        60
OIR    2025250     91400   19.1300 -113.1000       7.9       175       128        60
OIR    2025250     91400   19.1300 -113.1100       7.9       175       127        60
OIR    2025250     91400   19.1300 -113.1200       7.9       175       127        60
OIR    2025250     91400   19.1300 -113.1300       7.9       175       125        60
OIR    2025250     91400   19.1300 -113.1400       7.9       175       123        60
OIR    2025250     91400   19.1300 -113.1500       7.9       175       122        60
OIR    2025250     91400   19.1300 -113.1600       7.9       175       123        60
OIR    2025250     91400   19.1300 -113.1700       7.9       175       123        60
OIR    2025250     91400   19.1300 -113.1800       7.9       176       121        60
OIR    2025250     91400   19.1300 -113.1900       8.0       176       119        60
OIR    2025250     91400   19.1300 -113.2000       8.0       176       117        60
OIR    2025250     91400   19.1300 -113.2100       8.0       176       116        60
OIR    2025250     91400   19.1300 -113.2200       8.0       176       116        60
OIR    2025250     91400   19.1300 -113.2300       8.0       176       115        60
OIR    2025250     91400   19.1300 -113.2400       8.0       176       114        60
OIR    2025250     91400   19.1300 -113.2500       8.0       176       114        60
OIR    2025250     91400   19.1300 -113.2600       8.0       176       114        60
OIR    2025250     91400   19.1300 -113.2700       8.0       176       113        60
OIR    2025250     91400   19.1300 -113.2800       8.0       176       113        60
OIR    2025250     91400   19.1300 -113.2900       8.1       176       112        60
OIR    2025250     91400   19.1300 -113.3000       8.1       176       111        60
OIR    2025250     91400   19.1300 -113.3100       8.1       176       109        60
OIR    2025250     91400   19.1300 -113.3200       8.1       176       108        60
OIR    2025250     91400   19.1300 -113.3300       8.1       176       107        60
OIR    2025250     91400   19.1300 -113.3400       8.2       176       107        60
OIR    2025250     91400   19.1300 -113.3500       8.2       176       108        60
OIR    2025250     91400   19.1300 -113.3600       8.2       176       107        60
OIR    2025250     91400   19.1300 -113.3700       8.2       176       107        60
OIR    2025250     91400   19.1300 -113.3800       8.3       176       105        60
OIR    2025250     91400   19.1300 -113.3900       8.3       176       105        60
OIR    2025250     91400   19.1300 -113.4000       8.3       176       105        60
OIR    2025250     91400   19.1300 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.1300 -113.4200       8.4       176       104        60
OIR    2025250     91400   19.1300 -113.4300       8.5       176       104        60
OIR    2025250     91400   19.1300 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.1300 -113.4500       8.6       176       104        60
OIR    2025250     91400   19.1300 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.1300 -113.4700       8.6       176       104        60
OIR    2025250     91400   19.1300 -113.4800       8.6       176       104        60
OIR    2025250     91400   19.1300 -113.4900       8.7       176       105        60
OIR    2025250     91400   19.1300 -113.5000       8.7       176       105        60
OIR    2025250     91400   19.1300 -113.5100       8.7       176       105        60
OIR    2025250     91400   19.1300 -113.5200       8.7       176       105        60
OIR    2025250     91400   19.1300 -113.5300       8.8       176       105        60
OIR    2025250     91400   19.1300 -113.5400       8.9       176       105        60
OIR    2025250     91400   19.1300 -113.5500       8.9       176       107        60
OIR    2025250     91400   19.1300 -113.5600       8.9       176       108        60
OIR    2025250     91400   19.1300 -113.5700       9.0       177       108        60
OIR    2025250     91400   19.1300 -113.5800       9.0       177       109        60
OIR    2025250     91400   19.1300 -113.5900       9.0       177       109        60
OIR    2025250     91400   19.1300 -113.6000       9.1       177       109        60
OIR    2025250     91400   19.1300 -113.6100       9.1       177       109        60
OIR    2025250     91400   19.1300 -113.6200       9.1       177       110        60
OIR    2025250     91400   19.1300 -113.6300       9.2       177       111        60
OIR    2025250     91400   19.1300 -113.6400       9.2       177       112        60
OIR    2025250     91400   19.1300 -113.6500       9.2       177       112        60
OIR    2025250     91400   19.1300 -113.6600       9.2       178       112        60
OIR    2025250     91400   19.1300 -113.6700       9.2       178       112        60
OIR    2025250     91400   19.1300 -113.6800       9.3       178       112        60
OIR    2025250     91400   19.1300 -113.6900       9.3       178       113        60
OIR    2025250     91400   19.1300 -113.7000       9.4       179       113        60
OIR    2025250     91400   19.1300 -113.7100       9.6       180       113        60
OIR    2025250     91400   19.1300 -113.7200       9.7       180       113        60
OIR    2025250     91400   19.1300 -113.7300       9.8       181       112        60
OIR    2025250     91400   19.1300 -113.7400       9.9       181       112        60
OIR    2025250     91400   19.1300 -113.7500      10.0       181       111        60
OIR    2025250     91400   19.1300 -113.7600      10.0       182       111        60
OIR    2025250     91400   19.1300 -113.7700      10.1       182       111        60
OIR    2025250     91400   19.1300 -113.7800      10.1       182       112        60
OIR    2025250     91400   19.1300 -113.7900      10.2       183       113        60
OIR    2025250     91400   19.1300 -113.8000      10.2       183       114        60
OIR    2025250     91400   19.1300 -113.8100      10.3       183       114        60
OIR    2025250     91400   19.1300 -113.8200      10.4       184       113        60
OIR    2025250     91400   19.1300 -113.8300      10.4       184       112        60
OIR    2025250     91400   19.1300 -113.8400      10.5       185       111        60
OIR    2025250     91400   19.1300 -113.8500      10.5       185       112        60
OIR    2025250     91400   19.1300 -113.8600      10.6       185       113        60
OIR    2025250     91400   19.1300 -113.8700      10.6       185       113        60
OIR    2025250     91400   19.1300 -113.8800      10.6       185       113        60
OIR    2025250     91400   19.1300 -113.8900      10.6       185       113        60
OIR    2025250     91400   19.1300 -113.9000      10.6       185       112        60
OIR    2025250     91400   19.1300 -113.9100      10.6       186       113        60
OIR    2025250     91400   19.1300 -113.9200      10.6       186       114        60
OIR    2025250     91400   19.1300 -113.9300      10.6       186       114        60
OIR    2025250     91400   19.1300 -113.9400      10.6       186       115        60
OIR    2025250     91400   19.1300 -113.9500      10.7       186       116        60
OIR    2025250     91400   19.1300 -113.9600      10.7       186       116        60
OIR    2025250     91400   19.1300 -113.9700      10.7       186       116        60
OIR    2025250     91400   19.1300 -113.9800      10.7       186       116        60
OIR    2025250     91400   19.1300 -113.9900      10.7       187       115        60
OIR    2025250     91400   19.1300 -114.0000      10.7       187       115        60
OIR    2025250     91400   19.1300 -114.0100      10.7       187       114        60
OIR    2025250     91400   19.1300 -114.0200      10.7       187       114        60
OIR    2025250     91400   19.1300 -114.0300      10.7       187       113        60
OIR    2025250     91400   19.1300 -114.0400      10.7       187       111        60
OIR    2025250     91400   19.1300 -114.0500      10.7       187       111        60
OIR    2025250     91400   19.1300 -114.0600      10.7       187       112        60
OIR    2025250     91400   19.1300 -114.0700      10.7       187       112        60
OIR    2025250     91400   19.1300 -114.0800      10.7       187       113        60
OIR    2025250     91400   19.1300 -114.0900      10.7       187       113        60
OIR    2025250     91400   19.1300 -114.1000      10.7       187       115        60
OIR    2025250     91400   19.1300 -114.1100      10.7       187       116        60
OIR    2025250     91400   19.1300 -114.1200      10.7       187       116        60
OIR    2025250     91400   19.1300 -114.1300      10.7       187       117        60
OIR    2025250     91400   19.1300 -114.1400      10.7       187       117        60
OIR    2025250     91400   19.1300 -114.1500      10.7       187       116        60
OIR    2025250     91400   19.1300 -114.1600      10.7       187       119        60
OIR    2025250     91400   19.1300 -114.1700      10.7       187       123        60
OIR    2025250     91400   19.1300 -114.1800      10.7       187       126        60
OIR    2025250     91400   19.1300 -114.1900      10.7       187       127        60
OIR    2025250     91400   19.1300 -114.2000      10.7       187       127        60
OIR    2025250     91400   19.1300 -114.2100      10.7       187       129        60
OIR    2025250     91400   19.1300 -114.2200      10.7       188       130        60
OIR    2025250     91400   19.1300 -114.2300      10.7       188       132        60
OIR    2025250     91400   19.1300 -114.2400      10.7       188       133        60
OIR    2025250     91400   19.1300 -114.2500      10.7       188       134        60
OIR    2025250     91400   19.1300 -114.2600      10.7       188       133        60
OIR    2025250     91400   19.1300 -114.2700      10.8       188       132        60
OIR    2025250     91400   19.1300 -114.2800      10.8       188       134        60
OIR    2025250     91400   19.1300 -114.2900      10.8       188       136        60
OIR    2025250     91400   19.1300 -114.3000      10.8       188       136        60
OIR    2025250     91400   19.1300 -114.3100      10.8       188       137        60
OIR    2025250     91400   19.1300 -114.3200      10.9       188       137        60
OIR    2025250     91400   19.1300 -114.3300      10.9       188       138        60
OIR    2025250     91400   19.1300 -114.3400      10.9       188       139        60
OIR    2025250     91400   19.1300 -114.3500      10.9       188       140        60
OIR    2025250     91400   19.1300 -114.3600      10.9       188       140        60
OIR    2025250     91400   19.1300 -116.0600       6.8       181       142        60
OIR    2025250     91400   19.1300 -116.0700       6.8       180       141        60
OIR    2025250     91400   19.1300 -116.0800       6.9       179       140        60
OIR    2025250     91400   19.1300 -116.0900       6.9       179       139        60
OIR    2025250     91400   19.1300 -116.1000       7.0       178       137        60
OIR    2025250     91400   19.1300 -116.1100       7.0       177       136        60
OIR    2025250     91400   19.1300 -116.1200       7.0       177       135        60
OIR    2025250     91400   19.1300 -116.1300       7.1       176       135        60
OIR    2025250     91400   19.1300 -116.1400       7.1       175       135        60
OIR    2025250     91400   19.1300 -116.1500       7.1       175       135        60
OIR    2025250     91400   19.1300 -116.1600       7.0       175       135        60
OIR    2025250     91400   19.1300 -116.1700       6.9       174       138        60
OIR    2025250     91400   19.1300 -116.1800       6.7       173       140        60
OIR    2025250     91400   19.1300 -116.1900       6.5       173       142        60
OIR    2025250     91400   19.1200 -111.4300      10.4        59       141        60
OIR    2025250     91400   19.1200 -111.4400      10.1        60       138        60
OIR    2025250     91400   19.1200 -111.4500       9.9        63       136        60
OIR    2025250     91400   19.1200 -111.4600       9.7        66       135        60
OIR    2025250     91400   19.1200 -111.4700       9.6        70       135        60
OIR    2025250     91400   19.1200 -111.4800       9.5        74       136        60
OIR    2025250     91400   19.1200 -111.4900       9.4        77       136        60
OIR    2025250     91400   19.1200 -111.5000       9.5        80       136        60
OIR    2025250     91400   19.1200 -111.5100       9.5        81       136        60
OIR    2025250     91400   19.1200 -111.5200       9.5        81       137        60
OIR    2025250     91400   19.1200 -111.5300       9.5        79       138        60
OIR    2025250     91400   19.1200 -111.5400       9.6        77       139        60
OIR    2025250     91400   19.1200 -111.5500       9.9        75       139        60
OIR    2025250     91400   19.1200 -111.5600      10.0        74       138        60
OIR    2025250     91400   19.1200 -111.5700      10.2        74       141        60
OIR    2025250     91400   19.1200 -111.6900      13.9        71       142        60
OIR    2025250     91400   19.1200 -111.7000      14.0        71       139        60
OIR    2025250     91400   19.1200 -111.7100      14.0        71       140        60
OIR    2025250     91400   19.1200 -111.7200      14.0        71       140        60
OIR    2025250     91400   19.1200 -111.7300      13.9        72       141        60
OIR    2025250     91400   19.1200 -112.9600       7.2       163       142        60
OIR    2025250     91400   19.1200 -112.9700       7.3       168       140        60
OIR    2025250     91400   19.1200 -112.9800       7.5       171       140        60
OIR    2025250     91400   19.1200 -112.9900       7.7       173       139        60
OIR    2025250     91400   19.1200 -113.0000       7.8       174       140        60
OIR    2025250     91400   19.1200 -113.0100       7.8       174       140        60
OIR    2025250     91400   19.1200 -113.0200       7.9       174       138        60
OIR    2025250     91400   19.1200 -113.0300       7.9       174       137        60
OIR    2025250     91400   19.1200 -113.0400       7.9       174       135        60
OIR    2025250     91400   19.1200 -113.0500       7.9       174       134        60
OIR    2025250     91400   19.1200 -113.0600       7.9       175       133        60
OIR    2025250     91400   19.1200 -113.0700       7.9       175       131        60
OIR    2025250     91400   19.1200 -113.0800       7.9       175       130        60
OIR    2025250     91400   19.1200 -113.0900       7.9       175       129        60
OIR    2025250     91400   19.1200 -113.1000       7.9       175       129        60
OIR    2025250     91400   19.1200 -113.1100       7.9       175       128        60
OIR    2025250     91400   19.1200 -113.1200       7.9       175       127        60
OIR    2025250     91400   19.1200 -113.1300       7.9       175       127        60
OIR    2025250     91400   19.1200 -113.1400       7.9       175       126        60
OIR    2025250     91400   19.1200 -113.1500       7.9       175       125        60
OIR    2025250     91400   19.1200 -113.1600       7.9       175       123        60
OIR    2025250     91400   19.1200 -113.1700       7.9       175       122        60
OIR    2025250     91400   19.1200 -113.1800       7.9       176       122        60
OIR    2025250     91400   19.1200 -113.1900       8.0       176       122        60
OIR    2025250     91400   19.1200 -113.2000       8.0       176       120        60
OIR    2025250     91400   19.1200 -113.2100       8.0       176       119        60
OIR    2025250     91400   19.1200 -113.2200       8.0       176       116        60
OIR    2025250     91400   19.1200 -113.2300       8.0       176       115        60
OIR    2025250     91400   19.1200 -113.2400       8.0       176       114        60
OIR    2025250     91400   19.1200 -113.2500       8.0       176       113        60
OIR    2025250     91400   19.1200 -113.2600       8.0       176       112        60
OIR    2025250     91400   19.1200 -113.2700       8.0       176       112        60
OIR    2025250     91400   19.1200 -113.2800       8.0       176       112        60
OIR    2025250     91400   19.1200 -113.2900       8.1       176       111        60
OIR    2025250     91400   19.1200 -113.3000       8.1       176       110        60
OIR    2025250     91400   19.1200 -113.3100       8.1       176       108        60
OIR    2025250     91400   19.1200 -113.3200       8.1       176       107        60
OIR    2025250     91400   19.1200 -113.3300       8.1       176       107        60
OIR    2025250     91400   19.1200 -113.3400       8.2       176       107        60
OIR    2025250     91400   19.1200 -113.3500       8.2       176       107        60
OIR    2025250     91400   19.1200 -113.3600       8.2       176       107        60
OIR    2025250     91400   19.1200 -113.3700       8.2       176       107        60
OIR    2025250     91400   19.1200 -113.3800       8.3       176       105        60
OIR    2025250     91400   19.1200 -113.3900       8.3       176       105        60
OIR    2025250     91400   19.1200 -113.4000       8.3       176       105        60
OIR    2025250     91400   19.1200 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.1200 -113.4200       8.5       176       104        60
OIR    2025250     91400   19.1200 -113.4300       8.5       176       104        60
OIR    2025250     91400   19.1200 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.1200 -113.4500       8.6       176       104        60
OIR    2025250     91400   19.1200 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.1200 -113.4700       8.6       176       105        60
OIR    2025250     91400   19.1200 -113.4800       8.7       176       105        60
OIR    2025250     91400   19.1200 -113.4900       8.7       176       105        60
OIR    2025250     91400   19.1200 -113.5000       8.7       176       105        60
OIR    2025250     91400   19.1200 -113.5100       8.7       176       105        60
OIR    2025250     91400   19.1200 -113.5200       8.8       176       105        60
OIR    2025250     91400   19.1200 -113.5300       8.8       176       105        60
OIR    2025250     91400   19.1200 -113.5400       8.9       176       105        60
OIR    2025250     91400   19.1200 -113.5500       8.9       176       105        60
OIR    2025250     91400   19.1200 -113.5600       9.0       176       105        60
OIR    2025250     91400   19.1200 -113.5700       9.0       176       108        60
OIR    2025250     91400   19.1200 -113.5800       9.0       177       110        60
OIR    2025250     91400   19.1200 -113.5900       9.1       177       111        60
OIR    2025250     91400   19.1200 -113.6000       9.1       177       110        60
OIR    2025250     91400   19.1200 -113.6100       9.1       177       110        60
OIR    2025250     91400   19.1200 -113.6200       9.2       177       111        60
OIR    2025250     91400   19.1200 -113.6300       9.2       177       112        60
OIR    2025250     91400   19.1200 -113.6400       9.2       177       113        60
OIR    2025250     91400   19.1200 -113.6500       9.2       177       114        60
OIR    2025250     91400   19.1200 -113.6600       9.2       177       115        60
OIR    2025250     91400   19.1200 -113.6700       9.3       178       115        60
OIR    2025250     91400   19.1200 -113.6800       9.3       178       115        60
OIR    2025250     91400   19.1200 -113.6900       9.4       178       115        60
OIR    2025250     91400   19.1200 -113.7000       9.5       179       115        60
OIR    2025250     91400   19.1200 -113.7100       9.6       180       115        60
OIR    2025250     91400   19.1200 -113.7200       9.7       180       114        60
OIR    2025250     91400   19.1200 -113.7300       9.8       181       114        60
OIR    2025250     91400   19.1200 -113.7400       9.9       181       113        60
OIR    2025250     91400   19.1200 -113.7500      10.0       182       113        60
OIR    2025250     91400   19.1200 -113.7600      10.1       182       113        60
OIR    2025250     91400   19.1200 -113.7700      10.1       182       113        60
OIR    2025250     91400   19.1200 -113.7800      10.2       183       112        60
OIR    2025250     91400   19.1200 -113.7900      10.2       183       112        60
OIR    2025250     91400   19.1200 -113.8000      10.3       183       112        60
OIR    2025250     91400   19.1200 -113.8100      10.4       184       113        60
OIR    2025250     91400   19.1200 -113.8200      10.4       184       113        60
OIR    2025250     91400   19.1200 -113.8300      10.5       184       112        60
OIR    2025250     91400   19.1200 -113.8400      10.5       185       112        60
OIR    2025250     91400   19.1200 -113.8500      10.6       185       113        60
OIR    2025250     91400   19.1200 -113.8600      10.6       185       114        60
OIR    2025250     91400   19.1200 -113.8700      10.6       185       114        60
OIR    2025250     91400   19.1200 -113.8800      10.6       185       113        60
OIR    2025250     91400   19.1200 -113.8900      10.6       185       113        60
OIR    2025250     91400   19.1200 -113.9000      10.6       186       112        60
OIR    2025250     91400   19.1200 -113.9100      10.6       186       112        60
OIR    2025250     91400   19.1200 -113.9200      10.7       186       113        60
OIR    2025250     91400   19.1200 -113.9300      10.7       186       114        60
OIR    2025250     91400   19.1200 -113.9400      10.7       186       115        60
OIR    2025250     91400   19.1200 -113.9500      10.7       186       116        60
OIR    2025250     91400   19.1200 -113.9600      10.7       186       116        60
OIR    2025250     91400   19.1200 -113.9700      10.7       186       116        60
OIR    2025250     91400   19.1200 -113.9800      10.7       187       116        60
OIR    2025250     91400   19.1200 -113.9900      10.7       187       116        60
OIR    2025250     91400   19.1200 -114.0000      10.8       187       115        60
OIR    2025250     91400   19.1200 -114.0100      10.8       187       115        60
OIR    2025250     91400   19.1200 -114.0200      10.8       187       115        60
OIR    2025250     91400   19.1200 -114.0300      10.8       187       114        60
OIR    2025250     91400   19.1200 -114.0400      10.8       187       112        60
OIR    2025250     91400   19.1200 -114.0500      10.7       187       112        60
OIR    2025250     91400   19.1200 -114.0600      10.7       187       112        60
OIR    2025250     91400   19.1200 -114.0700      10.7       187       113        60
OIR    2025250     91400   19.1200 -114.0800      10.7       187       114        60
OIR    2025250     91400   19.1200 -114.0900      10.7       187       114        60
OIR    2025250     91400   19.1200 -114.1000      10.7       187       116        60
OIR    2025250     91400   19.1200 -114.1100      10.7       187       117        60
OIR    2025250     91400   19.1200 -114.1200      10.7       187       119        60
OIR    2025250     91400   19.1200 -114.1300      10.7       187       117        60
OIR    2025250     91400   19.1200 -114.1400      10.7       187       117        60
OIR    2025250     91400   19.1200 -114.1500      10.7       187       117        60
OIR    2025250     91400   19.1200 -114.1600      10.7       187       119        60
OIR    2025250     91400   19.1200 -114.1700      10.7       187       124        60
OIR    2025250     91400   19.1200 -114.1800      10.7       187       128        60
OIR    2025250     91400   19.1200 -114.1900      10.7       187       127        60
OIR    2025250     91400   19.1200 -114.2000      10.7       187       127        60
OIR    2025250     91400   19.1200 -114.2100      10.7       187       128        60
OIR    2025250     91400   19.1200 -114.2200      10.7       188       130        60
OIR    2025250     91400   19.1200 -114.2300      10.7       188       131        60
OIR    2025250     91400   19.1200 -114.2400      10.7       188       132        60
OIR    2025250     91400   19.1200 -114.2500      10.7       188       133        60
OIR    2025250     91400   19.1200 -114.2600      10.8       188       132        60
OIR    2025250     91400   19.1200 -114.2700      10.8       188       132        60
OIR    2025250     91400   19.1200 -114.2800      10.8       188       135        60
OIR    2025250     91400   19.1200 -114.2900      10.8       188       139        60
OIR    2025250     91400   19.1200 -114.3400      11.0       188       141        60
OIR    2025250     91400   19.1200 -116.0700       6.9       180       142        60
OIR    2025250     91400   19.1200 -116.0800       7.0       179       141        60
OIR    2025250     91400   19.1200 -116.0900       7.0       179       140        60
OIR    2025250     91400   19.1200 -116.1000       7.1       178       138        60
OIR    2025250     91400   19.1200 -116.1100       7.1       178       137        60
OIR    2025250     91400   19.1200 -116.1200       7.1       177       136        60
OIR    2025250     91400   19.1200 -116.1300       7.1       177       136        60
OIR    2025250     91400   19.1200 -116.1400       7.1       176       136        60
OIR    2025250     91400   19.1200 -116.1500       7.1       176       136        60
OIR    2025250     91400   19.1200 -116.1600       7.1       175       137        60
OIR    2025250     91400   19.1200 -116.1700       7.0       175       139        60
OIR    2025250     91400   19.1200 -116.1800       6.8       175       141        60
OIR    2025250     91400   19.1200 -116.1900       6.7       174       142        60
OIR    2025250     91400   19.1200 -116.2000       6.5       174       143        60
OIR    2025250     91400   19.1100 -111.4200      11.2        60       141        60
OIR    2025250     91400   19.1100 -111.4300      10.9        62       138        60
OIR    2025250     91400   19.1100 -111.4400      10.7        64       136        60
OIR    2025250     91400   19.1100 -111.4500      10.3        68       134        60
OIR    2025250     91400   19.1100 -111.4600      10.0        72       133        60
OIR    2025250     91400   19.1100 -111.4700       9.9        78       133        60
OIR    2025250     91400   19.1100 -111.4800       9.8        83       135        60
OIR    2025250     91400   19.1100 -111.4900       9.8        90       138        60
OIR    2025250     91400   19.1100 -111.5000      10.0        95       138        60
OIR    2025250     91400   19.1100 -111.5100      10.2        99       137        60
OIR    2025250     91400   19.1100 -111.5200      10.1       100       138        60
OIR    2025250     91400   19.1100 -111.5300       9.9        98       140        60
OIR    2025250     91400   19.1100 -111.5400       9.8        95       141        60
OIR    2025250     91400   19.1100 -111.5500       9.9        92       141        60
OIR    2025250     91400   19.1100 -111.5600      10.2        89       141        60
OIR    2025250     91400   19.1100 -111.7100      14.0        71       141        60
OIR    2025250     91400   19.1100 -111.7200      14.0        71       140        60
OIR    2025250     91400   19.1100 -111.7300      13.8        72       139        60
OIR    2025250     91400   19.1100 -111.7400      13.6        75       140        60
OIR    2025250     91400   19.1100 -111.7500      13.6        76       140        60
OIR    2025250     91400   19.1100 -112.9700       7.1       164       142        60
OIR    2025250     91400   19.1100 -112.9800       7.2       168       142        60
OIR    2025250     91400   19.1100 -112.9900       7.5       171       142        60
OIR    2025250     91400   19.1100 -113.0000       7.7       173       142        60
OIR    2025250     91400   19.1100 -113.0100       7.8       174       142        60
OIR    2025250     91400   19.1100 -113.0200       7.9       174       139        60
OIR    2025250     91400   19.1100 -113.0300       7.9       174       136        60
OIR    2025250     91400   19.1100 -113.0400       7.9       174       134        60
OIR    2025250     91400   19.1100 -113.0500       7.9       174       134        60
OIR    2025250     91400   19.1100 -113.0600       7.9       175       133        60
OIR    2025250     91400   19.1100 -113.0700       7.9       175       132        60
OIR    2025250     91400   19.1100 -113.0800       7.9       175       130        60
OIR    2025250     91400   19.1100 -113.0900       7.9       175       130        60
OIR    2025250     91400   19.1100 -113.1000       7.9       175       130        60
OIR    2025250     91400   19.1100 -113.1100       7.9       175       129        60
OIR    2025250     91400   19.1100 -113.1200       7.9       175       128        60
OIR    2025250     91400   19.1100 -113.1300       7.9       175       127        60
OIR    2025250     91400   19.1100 -113.1400       7.9       175       127        60
OIR    2025250     91400   19.1100 -113.1500       7.9       175       127        60
OIR    2025250     91400   19.1100 -113.1600       7.9       175       125        60
OIR    2025250     91400   19.1100 -113.1700       7.9       175       121        60
OIR    2025250     91400   19.1100 -113.1800       8.0       176       121        60
OIR    2025250     91400   19.1100 -113.1900       8.0       176       123        60
OIR    2025250     91400   19.1100 -113.2000       8.0       176       123        60
OIR    2025250     91400   19.1100 -113.2100       8.0       176       120        60
OIR    2025250     91400   19.1100 -113.2200       8.0       176       117        60
OIR    2025250     91400   19.1100 -113.2300       8.0       176       116        60
OIR    2025250     91400   19.1100 -113.2400       8.0       176       113        60
OIR    2025250     91400   19.1100 -113.2500       8.0       176       112        60
OIR    2025250     91400   19.1100 -113.2600       8.0       176       111        60
OIR    2025250     91400   19.1100 -113.2700       8.0       176       110        60
OIR    2025250     91400   19.1100 -113.2800       8.0       176       110        60
OIR    2025250     91400   19.1100 -113.2900       8.0       176       110        60
OIR    2025250     91400   19.1100 -113.3000       8.1       176       108        60
OIR    2025250     91400   19.1100 -113.3100       8.1       176       105        60
OIR    2025250     91400   19.1100 -113.3200       8.1       176       105        60
OIR    2025250     91400   19.1100 -113.3300       8.1       176       105        60
OIR    2025250     91400   19.1100 -113.3400       8.2       176       105        60
OIR    2025250     91400   19.1100 -113.3500       8.2       176       105        60
OIR    2025250     91400   19.1100 -113.3600       8.2       176       105        60
OIR    2025250     91400   19.1100 -113.3700       8.2       176       105        60
OIR    2025250     91400   19.1100 -113.3800       8.3       176       105        60
OIR    2025250     91400   19.1100 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.1100 -113.4000       8.4       176       104        60
OIR    2025250     91400   19.1100 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.1100 -113.4200       8.5       176       104        60
OIR    2025250     91400   19.1100 -113.4300       8.5       176       104        60
OIR    2025250     91400   19.1100 -113.4400       8.5       176       104        60
OIR    2025250     91400   19.1100 -113.4500       8.6       176       104        60
OIR    2025250     91400   19.1100 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.1100 -113.4700       8.6       176       105        60
OIR    2025250     91400   19.1100 -113.4800       8.7       176       105        60
OIR    2025250     91400   19.1100 -113.4900       8.7       176       104        60
OIR    2025250     91400   19.1100 -113.5000       8.7       176       104        60
OIR    2025250     91400   19.1100 -113.5100       8.8       176       105        60
OIR    2025250     91400   19.1100 -113.5200       8.8       176       105        60
OIR    2025250     91400   19.1100 -113.5300       8.9       176       105        60
OIR    2025250     91400   19.1100 -113.5400       8.9       176       104        60
OIR    2025250     91400   19.1100 -113.5500       9.0       176       105        60
OIR    2025250     91400   19.1100 -113.5600       9.0       176       105        60
OIR    2025250     91400   19.1100 -113.5700       9.0       176       107        60
OIR    2025250     91400   19.1100 -113.5800       9.1       177       109        60
OIR    2025250     91400   19.1100 -113.5900       9.1       177       110        60
OIR    2025250     91400   19.1100 -113.6000       9.1       177       110        60
OIR    2025250     91400   19.1100 -113.6100       9.2       177       109        60
OIR    2025250     91400   19.1100 -113.6200       9.2       177       110        60
OIR    2025250     91400   19.1100 -113.6300       9.2       177       111        60
OIR    2025250     91400   19.1100 -113.6400       9.2       177       112        60
OIR    2025250     91400   19.1100 -113.6500       9.2       177       114        60
OIR    2025250     91400   19.1100 -113.6600       9.3       177       115        60
OIR    2025250     91400   19.1100 -113.6700       9.3       178       115        60
OIR    2025250     91400   19.1100 -113.6800       9.3       178       115        60
OIR    2025250     91400   19.1100 -113.6900       9.4       179       115        60
OIR    2025250     91400   19.1100 -113.7000       9.5       179       115        60
OIR    2025250     91400   19.1100 -113.7100       9.7       180       115        60
OIR    2025250     91400   19.1100 -113.7200       9.8       181       115        60
OIR    2025250     91400   19.1100 -113.7300       9.9       181       114        60
OIR    2025250     91400   19.1100 -113.7400      10.0       182       114        60
OIR    2025250     91400   19.1100 -113.7500      10.0       182       113        60
OIR    2025250     91400   19.1100 -113.7600      10.1       182       113        60
OIR    2025250     91400   19.1100 -113.7700      10.2       183       113        60
OIR    2025250     91400   19.1100 -113.7800      10.2       183       113        60
OIR    2025250     91400   19.1100 -113.7900      10.3       183       112        60
OIR    2025250     91400   19.1100 -113.8000      10.4       184       112        60
OIR    2025250     91400   19.1100 -113.8100      10.4       184       112        60
OIR    2025250     91400   19.1100 -113.8200      10.5       184       112        60
OIR    2025250     91400   19.1100 -113.8300      10.5       185       112        60
OIR    2025250     91400   19.1100 -113.8400      10.6       185       112        60
OIR    2025250     91400   19.1100 -113.8500      10.6       185       113        60
OIR    2025250     91400   19.1100 -113.8600      10.6       185       114        60
OIR    2025250     91400   19.1100 -113.8700      10.6       185       115        60
OIR    2025250     91400   19.1100 -113.8800      10.6       185       114        60
OIR    2025250     91400   19.1100 -113.8900      10.7       186       113        60
OIR    2025250     91400   19.1100 -113.9000      10.7       186       113        60
OIR    2025250     91400   19.1100 -113.9100      10.7       186       112        60
OIR    2025250     91400   19.1100 -113.9200      10.7       186       113        60
OIR    2025250     91400   19.1100 -113.9300      10.7       186       113        60
OIR    2025250     91400   19.1100 -113.9400      10.7       186       114        60
OIR    2025250     91400   19.1100 -113.9500      10.7       186       116        60
OIR    2025250     91400   19.1100 -113.9600      10.8       186       116        60
OIR    2025250     91400   19.1100 -113.9700      10.8       187       116        60
OIR    2025250     91400   19.1100 -113.9800      10.8       187       116        60
OIR    2025250     91400   19.1100 -113.9900      10.8       187       116        60
OIR    2025250     91400   19.1100 -114.0000      10.8       187       116        60
OIR    2025250     91400   19.1100 -114.0100      10.8       187       116        60
OIR    2025250     91400   19.1100 -114.0200      10.8       187       116        60
OIR    2025250     91400   19.1100 -114.0300      10.8       187       116        60
OIR    2025250     91400   19.1100 -114.0400      10.8       187       115        60
OIR    2025250     91400   19.1100 -114.0500      10.8       187       115        60
OIR    2025250     91400   19.1100 -114.0600      10.8       187       115        60
OIR    2025250     91400   19.1100 -114.0700      10.8       187       115        60
OIR    2025250     91400   19.1100 -114.0800      10.8       187       115        60
OIR    2025250     91400   19.1100 -114.0900      10.7       187       115        60
OIR    2025250     91400   19.1100 -114.1000      10.7       187       116        60
OIR    2025250     91400   19.1100 -114.1100      10.7       187       119        60
OIR    2025250     91400   19.1100 -114.1200      10.7       187       120        60
OIR    2025250     91400   19.1100 -114.1300      10.7       187       119        60
OIR    2025250     91400   19.1100 -114.1400      10.7       187       119        60
OIR    2025250     91400   19.1100 -114.1500      10.7       187       119        60
OIR    2025250     91400   19.1100 -114.1600      10.7       187       119        60
OIR    2025250     91400   19.1100 -114.1700      10.7       187       123        60
OIR    2025250     91400   19.1100 -114.1800      10.7       187       128        60
OIR    2025250     91400   19.1100 -114.1900      10.7       187       129        60
OIR    2025250     91400   19.1100 -114.2000      10.7       187       128        60
OIR    2025250     91400   19.1100 -114.2100      10.8       188       129        60
OIR    2025250     91400   19.1100 -114.2200      10.8       188       130        60
OIR    2025250     91400   19.1100 -114.2300      10.8       188       131        60
OIR    2025250     91400   19.1100 -114.2400      10.8       188       133        60
OIR    2025250     91400   19.1100 -114.2500      10.8       188       135        60
OIR    2025250     91400   19.1100 -114.2600      10.8       188       136        60
OIR    2025250     91400   19.1100 -114.2700      10.8       188       136        60
OIR    2025250     91400   19.1100 -114.2800      10.9       188       137        60
OIR    2025250     91400   19.1100 -114.2900      10.9       188       141        60
OIR    2025250     91400   19.1100 -116.0800       7.1       179       142        60
OIR    2025250     91400   19.1100 -116.0900       7.1       179       140        60
OIR    2025250     91400   19.1100 -116.1000       7.1       179       139        60
OIR    2025250     91400   19.1100 -116.1100       7.1       178       137        60
OIR    2025250     91400   19.1100 -116.1200       7.2       177       136        60
OIR    2025250     91400   19.1100 -116.1300       7.2       177       136        60
OIR    2025250     91400   19.1100 -116.1400       7.2       177       136        60
OIR    2025250     91400   19.1100 -116.1500       7.1       176       137        60
OIR    2025250     91400   19.1100 -116.1600       7.1       176       138        60
OIR    2025250     91400   19.1100 -116.1700       7.1       176       140        60
OIR    2025250     91400   19.1100 -116.1800       7.0       176       143        60
OIR    2025250     91400   19.1100 -116.1900       6.9       175       143        60
OIR    2025250     91400   19.1000 -110.2900      10.4       135       141        60
OIR    2025250     91400   19.1000 -110.3000      10.8       135       126        60
OIR    2025250     91400   19.1000 -110.3100      10.7       135       140        60
OIR    2025250     91400   19.1000 -110.5300      18.7       106       141        60
OIR    2025250     91400   19.1000 -110.5400      18.4       104       138        60
OIR    2025250     91400   19.1000 -111.4300      11.6        65       138        60
OIR    2025250     91400   19.1000 -111.4400      11.4        69       135        60
OIR    2025250     91400   19.1000 -111.4500      11.2        75       133        60
OIR    2025250     91400   19.1000 -111.4600      11.0        83       133        60
OIR    2025250     91400   19.1000 -111.4700      11.1        92       132        60
OIR    2025250     91400   19.1000 -111.4800      11.5       101       135        60
OIR    2025250     91400   19.1000 -111.4900      12.1       110       139        60
OIR    2025250     91400   19.1000 -111.5000      12.7       115       139        60
OIR    2025250     91400   19.1000 -111.5100      12.7       117       138        60
OIR    2025250     91400   19.1000 -111.5200      12.2       116       138        60
OIR    2025250     91400   19.1000 -111.5300      11.6       113       139        60
OIR    2025250     91400   19.1000 -111.5400      10.9       107       141        60
OIR    2025250     91400   19.1000 -111.7200      14.0        71       141        60
OIR    2025250     91400   19.1000 -111.7300      13.9        72       138        60
OIR    2025250     91400   19.1000 -111.7400      13.8        74       138        60
OIR    2025250     91400   19.1000 -111.7500      13.7        75       138        60
OIR    2025250     91400   19.1000 -113.0200       7.9       174       139        60
OIR    2025250     91400   19.1000 -113.0300       7.9       174       134        60
OIR    2025250     91400   19.1000 -113.0400       7.9       174       132        60
OIR    2025250     91400   19.1000 -113.0500       7.9       174       133        60
OIR    2025250     91400   19.1000 -113.0600       7.9       174       134        60
OIR    2025250     91400   19.1000 -113.0700       7.9       175       133        60
OIR    2025250     91400   19.1000 -113.0800       7.9       175       132        60
OIR    2025250     91400   19.1000 -113.0900       7.9       175       132        60
OIR    2025250     91400   19.1000 -113.1000       7.9       175       132        60
OIR    2025250     91400   19.1000 -113.1100       7.9       175       131        60
OIR    2025250     91400   19.1000 -113.1200       7.9       175       130        60
OIR    2025250     91400   19.1000 -113.1300       7.9       175       128        60
OIR    2025250     91400   19.1000 -113.1400       7.9       175       128        60
OIR    2025250     91400   19.1000 -113.1500       7.9       175       128        60
OIR    2025250     91400   19.1000 -113.1600       7.9       175       127        60
OIR    2025250     91400   19.1000 -113.1700       8.0       175       125        60
OIR    2025250     91400   19.1000 -113.1800       8.0       176       123        60
OIR    2025250     91400   19.1000 -113.1900       8.0       176       122        60
OIR    2025250     91400   19.1000 -113.2000       8.0       176       121        60
OIR    2025250     91400   19.1000 -113.2100       8.0       176       119        60
OIR    2025250     91400   19.1000 -113.2200       8.0       176       116        60
OIR    2025250     91400   19.1000 -113.2300       8.0       176       116        60
OIR    2025250     91400   19.1000 -113.2400       8.0       176       114        60
OIR    2025250     91400   19.1000 -113.2500       8.0       176       113        60
OIR    2025250     91400   19.1000 -113.2600       8.0       176       112        60
OIR    2025250     91400   19.1000 -113.2700       8.0       176       111        60
OIR    2025250     91400   19.1000 -113.2800       8.0       176       110        60
OIR    2025250     91400   19.1000 -113.2900       8.0       176       110        60
OIR    2025250     91400   19.1000 -113.3000       8.1       176       109        60
OIR    2025250     91400   19.1000 -113.3100       8.1       176       108        60
OIR    2025250     91400   19.1000 -113.3200       8.1       176       107        60
OIR    2025250     91400   19.1000 -113.3300       8.1       176       107        60
OIR    2025250     91400   19.1000 -113.3400       8.1       176       105        60
OIR    2025250     91400   19.1000 -113.3500       8.2       176       105        60
OIR    2025250     91400   19.1000 -113.3600       8.2       176       105        60
OIR    2025250     91400   19.1000 -113.3700       8.2       176       105        60
OIR    2025250     91400   19.1000 -113.3800       8.3       176       105        60
OIR    2025250     91400   19.1000 -113.3900       8.3       176       104        60
OIR    2025250     91400   19.1000 -113.4000       8.4       176       104        60
OIR    2025250     91400   19.1000 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.1000 -113.4200       8.5       176       104        60
OIR    2025250     91400   19.1000 -113.4300       8.5       176       104        60
OIR    2025250     91400   19.1000 -113.4400       8.6       176       104        60
OIR    2025250     91400   19.1000 -113.4500       8.6       176       104        60
OIR    2025250     91400   19.1000 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.1000 -113.4700       8.7       176       105        60
OIR    2025250     91400   19.1000 -113.4800       8.7       176       107        60
OIR    2025250     91400   19.1000 -113.4900       8.7       176       105        60
OIR    2025250     91400   19.1000 -113.5000       8.7       176       104        60
OIR    2025250     91400   19.1000 -113.5100       8.8       176       104        60
OIR    2025250     91400   19.1000 -113.5200       8.8       176       104        60
OIR    2025250     91400   19.1000 -113.5300       8.9       176       104        60
OIR    2025250     91400   19.1000 -113.5400       8.9       176       104        60
OIR    2025250     91400   19.1000 -113.5500       9.0       176       105        60
OIR    2025250     91400   19.1000 -113.5600       9.0       176       105        60
OIR    2025250     91400   19.1000 -113.5700       9.1       176       107        60
OIR    2025250     91400   19.1000 -113.5800       9.1       176       108        60
OIR    2025250     91400   19.1000 -113.5900       9.1       177       109        60
OIR    2025250     91400   19.1000 -113.6000       9.2       177       109        60
OIR    2025250     91400   19.1000 -113.6100       9.2       177       110        60
OIR    2025250     91400   19.1000 -113.6200       9.2       177       109        60
OIR    2025250     91400   19.1000 -113.6300       9.2       177       109        60
OIR    2025250     91400   19.1000 -113.6400       9.2       177       110        60
OIR    2025250     91400   19.1000 -113.6500       9.3       177       112        60
OIR    2025250     91400   19.1000 -113.6600       9.3       177       115        60
OIR    2025250     91400   19.1000 -113.6700       9.3       178       115        60
OIR    2025250     91400   19.1000 -113.6800       9.3       178       114        60
OIR    2025250     91400   19.1000 -113.6900       9.4       179       114        60
OIR    2025250     91400   19.1000 -113.7000       9.6       180       113        60
OIR    2025250     91400   19.1000 -113.7100       9.7       180       113        60
OIR    2025250     91400   19.1000 -113.7200       9.8       181       113        60
OIR    2025250     91400   19.1000 -113.7300       9.9       181       113        60
OIR    2025250     91400   19.1000 -113.7400      10.0       182       113        60
OIR    2025250     91400   19.1000 -113.7500      10.1       182       112        60
OIR    2025250     91400   19.1000 -113.7600      10.1       182       112        60
OIR    2025250     91400   19.1000 -113.7700      10.2       183       112        60
OIR    2025250     91400   19.1000 -113.7800      10.3       183       113        60
OIR    2025250     91400   19.1000 -113.7900      10.3       183       114        60
OIR    2025250     91400   19.1000 -113.8000      10.4       184       114        60
OIR    2025250     91400   19.1000 -113.8100      10.5       184       112        60
OIR    2025250     91400   19.1000 -113.8200      10.5       184       111        60
OIR    2025250     91400   19.1000 -113.8300      10.6       185       111        60
OIR    2025250     91400   19.1000 -113.8400      10.6       185       111        60
OIR    2025250     91400   19.1000 -113.8500      10.6       185       113        60
OIR    2025250     91400   19.1000 -113.8600      10.6       185       114        60
OIR    2025250     91400   19.1000 -113.8700      10.7       185       115        60
OIR    2025250     91400   19.1000 -113.8800      10.7       186       114        60
OIR    2025250     91400   19.1000 -113.8900      10.7       186       114        60
OIR    2025250     91400   19.1000 -113.9000      10.7       186       113        60
OIR    2025250     91400   19.1000 -113.9100      10.7       186       112        60
OIR    2025250     91400   19.1000 -113.9200      10.7       186       112        60
OIR    2025250     91400   19.1000 -113.9300      10.8       186       112        60
OIR    2025250     91400   19.1000 -113.9400      10.8       186       113        60
OIR    2025250     91400   19.1000 -113.9500      10.8       186       115        60
OIR    2025250     91400   19.1000 -113.9600      10.8       187       116        60
OIR    2025250     91400   19.1000 -113.9700      10.8       187       115        60
OIR    2025250     91400   19.1000 -113.9800      10.8       187       115        60
OIR    2025250     91400   19.1000 -113.9900      10.8       187       116        60
OIR    2025250     91400   19.1000 -114.0000      10.8       187       116        60
OIR    2025250     91400   19.1000 -114.0100      10.8       187       116        60
OIR    2025250     91400   19.1000 -114.0200      10.8       187       116        60
OIR    2025250     91400   19.1000 -114.0300      10.8       187       116        60
OIR    2025250     91400   19.1000 -114.0400      10.8       187       116        60
OIR    2025250     91400   19.1000 -114.0500      10.8       187       115        60
OIR    2025250     91400   19.1000 -114.0600      10.8       187       115        60
OIR    2025250     91400   19.1000 -114.0700      10.8       187       116        60
OIR    2025250     91400   19.1000 -114.0800      10.8       187       115        60
OIR    2025250     91400   19.1000 -114.0900      10.8       187       115        60
OIR    2025250     91400   19.1000 -114.1000      10.8       187       116        60
OIR    2025250     91400   19.1000 -114.1100      10.8       187       119        60
OIR    2025250     91400   19.1000 -114.1200      10.8       187       121        60
OIR    2025250     91400   19.1000 -114.1300      10.8       187       120        60
OIR    2025250     91400   19.1000 -114.1400      10.8       187       120        60
OIR    2025250     91400   19.1000 -114.1500      10.8       187       120        60
OIR    2025250     91400   19.1000 -114.1600      10.8       187       120        60
OIR    2025250     91400   19.1000 -114.1700      10.8       187       123        60
OIR    2025250     91400   19.1000 -114.1800      10.8       187       128        60
OIR    2025250     91400   19.1000 -114.1900      10.8       187       130        60
OIR    2025250     91400   19.1000 -114.2000      10.8       187       130        60
OIR    2025250     91400   19.1000 -114.2100      10.8       188       130        60
OIR    2025250     91400   19.1000 -114.2200      10.8       188       131        60
OIR    2025250     91400   19.1000 -114.2300      10.8       188       132        60
OIR    2025250     91400   19.1000 -114.2400      10.8       188       135        60
OIR    2025250     91400   19.1000 -114.2500      10.8       188       138        60
OIR    2025250     91400   19.1000 -114.2600      10.8       188       140        60
OIR    2025250     91400   19.1000 -114.2700      10.9       188       140        60
OIR    2025250     91400   19.1000 -114.2800      10.9       188       141        60
OIR    2025250     91400   19.1000 -116.0900       7.1       179       142        60
OIR    2025250     91400   19.1000 -116.1000       7.1       179       140        60
OIR    2025250     91400   19.1000 -116.1100       7.2       178       139        60
OIR    2025250     91400   19.1000 -116.1200       7.2       177       138        60
OIR    2025250     91400   19.1000 -116.1300       7.2       177       138        60
OIR    2025250     91400   19.1000 -116.1400       7.2       177       137        60
OIR    2025250     91400   19.1000 -116.1500       7.2       177       138        60
OIR    2025250     91400   19.1000 -116.1600       7.1       177       140        60
OIR    2025250     91400   19.1000 -116.1700       7.1       177       141        60
OIR    2025250     91400   19.1000 -116.1800       7.1       176       143        60
OIR    2025250     91400   19.0900 -110.2600       7.4        65       141        60
OIR    2025250     91400   19.0900 -110.3000      10.4       145       138        60
OIR    2025250     91400   19.0900 -110.3100       4.5       113       140        60
OIR    2025250     91400   19.0900 -110.5100      18.7       109       141        60
OIR    2025250     91400   19.0900 -110.5200      18.7       109       136        60
OIR    2025250     91400   19.0900 -110.5300      18.5       106       137        60
OIR    2025250     91400   19.0900 -110.5400      18.4       104       140        60
OIR    2025250     91400   19.0900 -111.4300      12.2        69       140        60
OIR    2025250     91400   19.0900 -111.4400      12.4        76       134        60
OIR    2025250     91400   19.0900 -111.4500      12.6        85       131        60
OIR    2025250     91400   19.0900 -111.4600      12.9        96       133        60
OIR    2025250     91400   19.0900 -111.4700      13.7       106       135        60
OIR    2025250     91400   19.0900 -111.4800      14.3       114       137        60
OIR    2025250     91400   19.0900 -111.4900      14.4       118       138        60
OIR    2025250     91400   19.0900 -111.5000      14.1       119       138        60
OIR    2025250     91400   19.0900 -111.5100      13.6       119       137        60
OIR    2025250     91400   19.0900 -111.5200      13.2       119       136        60
OIR    2025250     91400   19.0900 -111.5300      12.6       117       137        60
OIR    2025250     91400   19.0900 -111.5400      11.4       109       138        60
OIR    2025250     91400   19.0900 -111.5500      11.1       105       139        60
OIR    2025250     91400   19.0900 -111.7300      14.0        72       138        60
OIR    2025250     91400   19.0900 -111.7400      14.1        73       138        60
OIR    2025250     91400   19.0900 -111.7500      14.0        74       138        60
OIR    2025250     91400   19.0900 -111.7600      13.4        75       140        60
OIR    2025250     91400   19.0900 -113.0100       7.8       173       142        60
OIR    2025250     91400   19.0900 -113.0200       7.9       174       140        60
OIR    2025250     91400   19.0900 -113.0300       7.9       174       136        60
OIR    2025250     91400   19.0900 -113.0400       7.9       174       133        60
OIR    2025250     91400   19.0900 -113.0500       7.9       174       134        60
OIR    2025250     91400   19.0900 -113.0600       7.9       174       135        60
OIR    2025250     91400   19.0900 -113.0700       7.9       174       134        60
OIR    2025250     91400   19.0900 -113.0800       7.9       175       133        60
OIR    2025250     91400   19.0900 -113.0900       7.9       175       132        60
OIR    2025250     91400   19.0900 -113.1000       7.9       175       133        60
OIR    2025250     91400   19.0900 -113.1100       7.9       175       133        60
OIR    2025250     91400   19.0900 -113.1200       7.9       175       131        60
OIR    2025250     91400   19.0900 -113.1300       7.9       175       129        60
OIR    2025250     91400   19.0900 -113.1400       7.9       175       129        60
OIR    2025250     91400   19.0900 -113.1500       7.9       175       129        60
OIR    2025250     91400   19.0900 -113.1600       7.9       175       128        60
OIR    2025250     91400   19.0900 -113.1700       8.0       175       127        60
OIR    2025250     91400   19.0900 -113.1800       8.0       176       126        60
OIR    2025250     91400   19.0900 -113.1900       8.0       176       123        60
OIR    2025250     91400   19.0900 -113.2000       8.0       176       119        60
OIR    2025250     91400   19.0900 -113.2100       8.0       176       116        60
OIR    2025250     91400   19.0900 -113.2200       8.0       176       116        60
OIR    2025250     91400   19.0900 -113.2300       8.0       176       115        60
OIR    2025250     91400   19.0900 -113.2400       8.0       176       115        60
OIR    2025250     91400   19.0900 -113.2500       8.0       176       114        60
OIR    2025250     91400   19.0900 -113.2600       8.0       176       113        60
OIR    2025250     91400   19.0900 -113.2700       8.0       176       111        60
OIR    2025250     91400   19.0900 -113.2800       8.0       176       111        60
OIR    2025250     91400   19.0900 -113.2900       8.0       176       110        60
OIR    2025250     91400   19.0900 -113.3000       8.0       176       110        60
OIR    2025250     91400   19.0900 -113.3100       8.1       176       109        60
OIR    2025250     91400   19.0900 -113.3200       8.1       176       109        60
OIR    2025250     91400   19.0900 -113.3300       8.1       176       108        60
OIR    2025250     91400   19.0900 -113.3400       8.1       176       108        60
OIR    2025250     91400   19.0900 -113.3500       8.2       176       107        60
OIR    2025250     91400   19.0900 -113.3600       8.2       176       107        60
OIR    2025250     91400   19.0900 -113.3700       8.2       176       105        60
OIR    2025250     91400   19.0900 -113.3800       8.3       176       105        60
OIR    2025250     91400   19.0900 -113.3900       8.3       176       105        60
OIR    2025250     91400   19.0900 -113.4000       8.4       176       105        60
OIR    2025250     91400   19.0900 -113.4100       8.4       176       104        60
OIR    2025250     91400   19.0900 -113.4200       8.5       176       105        60
OIR    2025250     91400   19.0900 -113.4300       8.5       176       107        60
OIR    2025250     91400   19.0900 -113.4400       8.6       176       105        60
OIR    2025250     91400   19.0900 -113.4500       8.6       176       104        60
OIR    2025250     91400   19.0900 -113.4600       8.6       176       104        60
OIR    2025250     91400   19.0900 -113.4700       8.7       176       105        60
OIR    2025250     91400   19.0900 -113.4800       8.7       176       107        60
OIR    2025250     91400   19.0900 -113.4900       8.7       176       105        60
OIR    2025250     91400   19.0900 -113.5000       8.8       176       105        60
OIR    2025250     91400   19.0900 -113.5100       8.8       176       105        60
OIR    2025250     91400   19.0900 -113.5200       8.9       176       105        60
OIR    2025250     91400   19.0900 -113.5300       8.9       176       105        60
OIR    2025250     91400   19.0900 -113.5400       9.0       176       105        60
OIR    2025250     91400   19.0900 -113.5500       9.0       176       105        60
OIR    2025250     91400   19.0900 -113.5600       9.0       176       107        60
OIR    2025250     91400   19.0900 -113.5700       9.1       176       107        60
OIR    2025250     91400   19.0900 -113.5800       9.1       176       108        60
OIR    2025250     91400   19.0900 -113.5900       9.2       176       109        60
OIR    2025250     91400   19.0900 -113.6000       9.2       176       109        60
OIR    2025250     91400   19.0900 -113.6100       9.2       177       109        60
OIR    2025250     91400   19.0900 -113.6200       9.2       177       110        60
OIR    2025250     91400   19.0900 -113.6300       9.2       177       110        60
OIR    2025250     91400   19.0900 -113.6400       9.3       177       111        60
OIR    2025250     91400   19.0900 -113.6500       9.3       177       112        60
OIR    2025250     91400   19.0900 -113.6600       9.3       177       114        60
OIR    2025250     91400   19.0900 -113.6700       9.3       178       115        60
OIR    2025250     91400   19.0900 -113.6800       9.4       178       115        60
OIR    2025250     91400   19.0900 -113.6900       9.5       179       114        60
OIR    2025250     91400   19.0900 -113.7000       9.6       180       114        60
OIR    2025250     91400   19.0900 -113.7100       9.8       181       113        60
OIR    2025250     91400   19.0900 -113.7200       9.9       181       114        60
OIR    2025250     91400   19.0900 -113.7300      10.0       182       114        60
OIR    2025250     91400   19.0900 -113.7400      10.0       182       113        60
OIR    2025250     91400   19.0900 -113.7500      10.1       182       113        60
OIR    2025250     91400   19.0900 -113.7600      10.2       183       112        60
OIR    2025250     91400   19.0900 -113.7700      10.2       183       112        60
OIR    2025250     91400   19.0900 -113.7800      10.3       183       112        60
OIR    2025250     91400   19.0900 -113.7900      10.4       184       114        60
OIR    2025250     91400   19.0900 -113.8000      10.5       184       116        60
OIR    2025250     91400   19.0900 -113.8100      10.5       184       114        60
OIR    2025250     91400   19.0900 -113.8200      10.6       185       112        60
OIR    2025250     91400   19.0900 -113.8300      10.6       185       111        60
OIR    2025250     91400   19.0900 -113.8400      10.6       185       111        60
OIR    2025250     91400   19.0900 -113.8500      10.6       185       112        60
OIR    2025250     91400   19.0900 -113.8600      10.7       185       114        60
OIR    2025250     91400   19.0900 -113.8700      10.7       186       115        60
OIR    2025250     91400   19.0900 -113.8800      10.7       186       115        60
OIR    2025250     91400   19.0900 -113.8900      10.7       186       115        60
OIR    2025250     91400   19.0900 -113.9000      10.8       186       113        60
OIR    2025250     91400   19.0900 -113.9100      10.8       186       112        60
OIR    2025250     91400   19.0900 -113.9200      10.8       186       111        60
OIR    2025250     91400   19.0900 -113.9300      10.8       186       111        60
OIR    2025250     91400   19.0900 -113.9400      10.8       187       112        60
OIR    2025250     91400   19.0900 -113.9500      10.8       187       114        60
OIR    2025250     91400   19.0900 -113.9600      10.8       187       115        60
OIR    2025250     91400   19.0900 -113.9700      10.8       187       114        60
OIR    2025250     91400   19.0900 -113.9800      10.8       187       114        60
OIR    2025250     91400   19.0900 -113.9900      10.8       187       115        60
OIR    2025250     91400   19.0900 -114.0000      10.8       187       116        60
OIR    2025250     91400   19.0900 -114.0100      10.8       187       116        60
OIR    2025250     91400   19.0900 -114.0200      10.8       187       116        60
OIR    2025250     91400   19.0900 -114.0300      10.8       187       116        60
OIR    2025250     91400   19.0900 -114.0400      10.8       187       115        60
OIR    2025250     91400   19.0900 -114.0500      10.8       187       114        60
OIR    2025250     91400   19.0900 -114.0600      10.8       187       113        60
OIR    2025250     91400   19.0900 -114.0700      10.8       187       114        60
OIR    2025250     91400   19.0900 -114.0800      10.8       187       114        60
OIR    2025250     91400   19.0900 -114.0900      10.8       187       115        60
OIR    2025250     91400   19.0900 -114.1000      10.8       187       116        60
OIR    2025250     91400   19.0900 -114.1100      10.8       187       116        60
OIR    2025250     91400   19.0900 -114.1200      10.8       187       119        60
OIR    2025250     91400   19.0900 -114.1300      10.8       187       120        60
OIR    2025250     91400   19.0900 -114.1400      10.8       187       121        60
OIR    2025250     91400   19.0900 -114.1500      10.8       187       121        60
OIR    2025250     91400   19.0900 -114.1600      10.8       187       120        60
OIR    2025250     91400   19.0900 -114.1700      10.8       187       122        60
OIR    2025250     91400   19.0900 -114.1800      10.8       187       127        60
OIR    2025250     91400   19.0900 -114.1900      10.8       187       131        60
OIR    2025250     91400   19.0900 -114.2000      10.8       188       130        60
OIR    2025250     91400   19.0900 -114.2100      10.8       188       130        60
OIR    2025250     91400   19.0900 -114.2200      10.8       188       134        60
OIR    2025250     91400   19.0900 -114.2300      10.8       188       138        60
OIR    2025250     91400   19.0900 -114.2400      10.9       188       137        60
OIR    2025250     91400   19.0900 -114.2500      10.9       188       136        60
OIR    2025250     91400   19.0900 -114.2600      10.9       188       137        60
OIR    2025250     91400   19.0900 -114.2700      11.0       188       139        60
OIR    2025250     91400   19.0900 -114.2800      11.0       188       141        60
OIR    2025250     91400   19.0900 -114.5200      10.9       188       140        60
OIR    2025250     91400   19.0900 -114.5300      10.9       188       139        60
OIR    2025250     91400   19.0900 -114.6400      10.5       188       139        60
OIR    2025250     91400   19.0900 -116.1000       7.2       179       142        60
OIR    2025250     91400   19.0900 -116.1100       7.2       178       142        60
OIR    2025250     91400   19.0900 -116.1200       7.2       178       142        60
OIR    2025250     91400   19.0900 -116.1300       7.2       178       140        60
OIR    2025250     91400   19.0900 -116.1400       7.2       177       139        60
OIR    2025250     91400   19.0900 -116.1500       7.2       177       139        60
OIR    2025250     91400   19.0900 -116.1600       7.2       177       141        60
OIR    2025250     91400   19.0900 -116.1700       7.1       177       142        60
OIR    2025250     91400   19.0900 -116.1800       7.1       177       143        60
OIR    2025250     91400   19.0800 -110.2500       7.8        62       136        60
OIR    2025250     91400   19.0800 -110.2600       4.7        85       130        60
OIR    2025250     91400   19.0800 -110.2700       4.9       138       137        60
OIR    2025250     91400   19.0800 -110.2800       8.5       178       142        60
OIR    2025250     91400   19.0800 -110.3200      49.1         6       142        60
OIR    2025250     91400   19.0800 -110.3300      69.8         8       141        60
OIR    2025250     91400   19.0800 -110.4200      20.2       110       138        60
OIR    2025250     91400   19.0800 -110.4300      21.0       112       128        60
OIR    2025250     91400   19.0800 -111.4400      14.2        88       135        60
OIR    2025250     91400   19.0800 -111.4500      15.2        98       128        60
OIR    2025250     91400   19.0800 -111.4600      15.7       108       132        60
OIR    2025250     91400   19.0800 -111.4700      15.9       113       135        60
OIR    2025250     91400   19.0800 -111.4800      15.8       117       137        60
OIR    2025250     91400   19.0800 -111.4900      15.3       119       136        60
OIR    2025250     91400   19.0800 -111.5000      14.6       120       135        60
OIR    2025250     91400   19.0800 -111.5100      13.7       118       135        60
OIR    2025250     91400   19.0800 -111.5200      13.2       117       135        60
OIR    2025250     91400   19.0800 -111.5300      12.8       115       134        60
OIR    2025250     91400   19.0800 -111.5400      11.7       109       134        60
OIR    2025250     91400   19.0800 -111.5500      11.4       106       135        60
OIR    2025250     91400   19.0800 -111.5600      11.4       106       139        60
OIR    2025250     91400   19.0800 -111.5900      11.0       104       142        60
OIR    2025250     91400   19.0800 -111.7300      14.1        72       141        60
OIR    2025250     91400   19.0800 -111.7400      14.2        72       139        60
OIR    2025250     91400   19.0800 -111.7500      14.2        73       140        60
OIR    2025250     91400   19.0800 -111.7600      13.2        75       140        60
OIR    2025250     91400   19.0800 -113.0000       7.4       167       141        60
OIR    2025250     91400   19.0800 -113.0100       7.7       171       140        60
OIR    2025250     91400   19.0800 -113.0200       7.8       173       139        60
OIR    2025250     91400   19.0800 -113.0300       7.9       174       139        60
OIR    2025250     91400   19.0800 -113.0400       7.9       174       139        60
OIR    2025250     91400   19.0800 -113.0500       7.9       174       138        60
OIR    2025250     91400   19.0800 -113.0600       7.9       174       138        60
OIR    2025250     91400   19.0800 -113.0700       7.9       174       136        60
OIR    2025250     91400   19.0800 -113.0800       7.9       174       133        60
OIR    2025250     91400   19.0800 -113.0900       7.9       175       130        60
OIR    2025250     91400   19.0800 -113.1000       7.9       175       133        60
OIR    2025250     91400   19.0800 -113.1100       7.9       175       135        60
OIR    2025250     91400   19.0800 -113.1200       7.9       175       133        60
OIR    2025250     91400   19.0800 -113.1300       7.9       175       131        60
OIR    2025250     91400   19.0800 -113.1400       7.9       175       130        60
OIR    2025250     91400   19.0800 -113.1500       7.9       175       129        60
OIR    2025250     91400   19.0800 -113.1600       7.9       175       128        60
OIR    2025250     91400   19.0800 -113.1700       7.9       175       126        60
OIR    2025250     91400   19.0800 -113.1800       8.0       176       124        60
OIR    2025250     91400   19.0800 -113.1900       8.0       176       122        60
OIR    2025250     91400   19.0800 -113.2000       8.0       176       120        60
OIR    2025250     91400   19.0800 -113.2100       8.0       176       119        60
OIR    2025250     91400   19.0800 -113.2200       8.0       176       117        60
OIR    2025250     91400   19.0800 -113.2300       8.0       176       116        60
OIR    2025250     91400   19.0800 -113.2400       8.0       176       116        60
OIR    2025250     91400   19.0800 -113.2500       8.0       176       115        60
OIR    2025250     91400   19.0800 -113.2600       8.0       176       114        60
OIR    2025250     91400   19.0800 -113.2700       8.0       176       112        60
OIR    2025250     91400   19.0800 -113.2800       8.0       176       112        60
OIR    2025250     91400   19.0800 -113.2900       8.0       176       112        60
OIR    2025250     91400   19.0800 -113.3000       8.0       176       112        60
OIR    2025250     91400   19.0800 -113.3100       8.1       176       111        60
OIR    2025250     91400   19.0800 -113.3200       8.1       176       110        60
OIR    2025250     91400   19.0800 -113.3300       8.1       176       109        60
OIR    2025250     91400   19.0800 -113.3400       8.1       176       109        60
OIR    2025250     91400   19.0800 -113.3500       8.2       176       108        60
OIR    2025250     91400   19.0800 -113.3600       8.2       176       107        60
OIR    2025250     91400   19.0800 -113.3700       8.2       176       107        60
OIR    2025250     91400   19.0800 -113.3800       8.3       176       107        60
OIR    2025250     91400   19.0800 -113.3900       8.3       176       107        60
OIR    2025250     91400   19.0800 -113.4000       8.4       176       105        60
OIR    2025250     91400   19.0800 -113.4100       8.5       176       105        60
OIR    2025250     91400   19.0800 -113.4200       8.5       176       107        60
OIR    2025250     91400   19.0800 -113.4300       8.6       176       108        60
OIR    2025250     91400   19.0800 -113.4400       8.6       176       107        60
OIR    2025250     91400   19.0800 -113.4500       8.6       176       104        60
OIR    2025250     91400   19.0800 -113.4600       8.7       176       104        60
OIR    2025250     91400   19.0800 -113.4700       8.7       176       105        60
OIR    2025250     91400   19.0800 -113.4800       8.7       176       107        60
OIR    2025250     91400   19.0800 -113.4900       8.8       176       107        60
OIR    2025250     91400   19.0800 -113.5000       8.8       176       105        60
OIR    2025250     91400   19.0800 -113.5100       8.9       176       105        60
OIR    2025250     91400   19.0800 -113.5200       8.9       176       105        60
OIR    2025250     91400   19.0800 -113.5300       8.9       176       105        60
OIR    2025250     91400   19.0800 -113.5400       9.0       176       107        60
OIR    2025250     91400   19.0800 -113.5500       9.0       176       107        60
OIR    2025250     91400   19.0800 -113.5600       9.1       176       107        60
OIR    2025250     91400   19.0800 -113.5700       9.1       176       108        60
OIR    2025250     91400   19.0800 -113.5800       9.2       176       108        60
OIR    2025250     91400   19.0800 -113.5900       9.2       176       109        60
OIR    2025250     91400   19.0800 -113.6000       9.2       176       109        60
OIR    2025250     91400   19.0800 -113.6100       9.2       177       109        60
OIR    2025250     91400   19.0800 -113.6200       9.3       177       110        60
OIR    2025250     91400   19.0800 -113.6300       9.3       177       111        60
OIR    2025250     91400   19.0800 -113.6400       9.3       177       112        60
OIR    2025250     91400   19.0800 -113.6500       9.3       177       113        60
OIR    2025250     91400   19.0800 -113.6600       9.3       177       114        60
OIR    2025250     91400   19.0800 -113.6700       9.3       177       115        60
OIR    2025250     91400   19.0800 -113.6800       9.4       178       116        60
OIR    2025250     91400   19.0800 -113.6900       9.5       179       116        60
OIR    2025250     91400   19.0800 -113.7000       9.7       180       116        60
OIR    2025250     91400   19.0800 -113.7100       9.8       181       115        60
OIR    2025250     91400   19.0800 -113.7200       9.9       182       116        60
OIR    2025250     91400   19.0800 -113.7300      10.0       182       116        60
OIR    2025250     91400   19.0800 -113.7400      10.1       182       116        60
OIR    2025250     91400   19.0800 -113.7500      10.1       183       116        60
OIR    2025250     91400   19.0800 -113.7600      10.2       183       116        60
OIR    2025250     91400   19.0800 -113.7700      10.3       183       115        60
OIR    2025250     91400   19.0800 -113.7800      10.4       184       115        60
OIR    2025250     91400   19.0800 -113.7900      10.4       184       115        60
OIR    2025250     91400   19.0800 -113.8000      10.5       184       115        60
OIR    2025250     91400   19.0800 -113.8100      10.5       185       115        60
OIR    2025250     91400   19.0800 -113.8200      10.6       185       115        60
OIR    2025250     91400   19.0800 -113.8300      10.6       185       114        60
OIR    2025250     91400   19.0800 -113.8400      10.6       185       113        60
OIR    2025250     91400   19.0800 -113.8500      10.7       185       112        60
OIR    2025250     91400   19.0800 -113.8600      10.7       185       114        60
OIR    2025250     91400   19.0800 -113.8700      10.7       186       115        60
OIR    2025250     91400   19.0800 -113.8800      10.8       186       115        60
OIR    2025250     91400   19.0800 -113.8900      10.8       186       116        60
OIR    2025250     91400   19.0800 -113.9000      10.8       186       115        60
OIR    2025250     91400   19.0800 -113.9100      10.8       186       114        60
OIR    2025250     91400   19.0800 -113.9200      10.8       186       114        60
OIR    2025250     91400   19.0800 -113.9300      10.9       187       114        60
OIR    2025250     91400   19.0800 -113.9400      10.9       187       114        60
OIR    2025250     91400   19.0800 -113.9500      10.9       187       116        60
OIR    2025250     91400   19.0800 -113.9600      10.9       187       116        60
OIR    2025250     91400   19.0800 -113.9700      10.9       187       116        60
OIR    2025250     91400   19.0800 -113.9800      10.9       187       115        60
OIR    2025250     91400   19.0800 -113.9900      10.9       187       115        60
OIR    2025250     91400   19.0800 -114.0000      10.9       187       116        60
OIR    2025250     91400   19.0800 -114.0100      10.9       187       116        60
OIR    2025250     91400   19.0800 -114.0200      10.9       187       116        60
OIR    2025250     91400   19.0800 -114.0300      10.9       187       116        60
OIR    2025250     91400   19.0800 -114.0400      10.9       187       115        60
OIR    2025250     91400   19.0800 -114.0500      10.9       188       114        60
OIR    2025250     91400   19.0800 -114.0600      10.9       188       114        60
OIR    2025250     91400   19.0800 -114.0700      10.8       187       114        60
OIR    2025250     91400   19.0800 -114.0800      10.8       187       114        60
OIR    2025250     91400   19.0800 -114.0900      10.8       187       115        60
OIR    2025250     91400   19.0800 -114.1000      10.8       187       116        60
OIR    2025250     91400   19.0800 -114.1100      10.8       187       116        60
OIR    2025250     91400   19.0800 -114.1200      10.8       187       117        60
OIR    2025250     91400   19.0800 -114.1300      10.8       187       120        60
OIR    2025250     91400   19.0800 -114.1400      10.8       187       122        60
OIR    2025250     91400   19.0800 -114.1500      10.8       187       121        60
OIR    2025250     91400   19.0800 -114.1600      10.8       187       121        60
OIR    2025250     91400   19.0800 -114.1700      10.8       187       121        60
OIR    2025250     91400   19.0800 -114.1800      10.8       188       127        60
OIR    2025250     91400   19.0800 -114.1900      10.8       188       132        60
OIR    2025250     91400   19.0800 -114.2000      10.8       188       131        60
OIR    2025250     91400   19.0800 -114.2100      10.8       188       130        60
OIR    2025250     91400   19.0800 -114.2200      10.9       188       135        60
OIR    2025250     91400   19.0800 -114.2400      10.9       188       141        60
OIR    2025250     91400   19.0800 -114.2500      11.0       188       136        60
OIR    2025250     91400   19.0800 -114.2600      11.0       188       134        60
OIR    2025250     91400   19.0800 -114.2700      11.0       188       137        60
OIR    2025250     91400   19.0800 -114.2800      11.1       188       139        60
OIR    2025250     91400   19.0800 -116.1000       7.2       179       142        60
OIR    2025250     91400   19.0800 -116.1100       7.2       178       141        60
OIR    2025250     91400   19.0800 -116.1200       7.2       178       141        60
OIR    2025250     91400   19.0800 -116.1300       7.2       178       141        60
OIR    2025250     91400   19.0800 -116.1400       7.2       178       141        60
OIR    2025250     91400   19.0800 -116.1500       7.2       178       141        60
OIR    2025250     91400   19.0800 -116.1600       7.2       178       143        60
OIR    2025250     91400   19.0700 -110.1800      35.5       146       140        60
OIR    2025250     91400   19.0700 -110.1900      37.5       143       135        60
OIR    2025250     91400   19.0700 -110.2300      41.3        82       141        60
OIR    2025250     91400   19.0700 -110.2400       6.1        51       134        60
OIR    2025250     91400   19.0700 -110.2700       7.3       173       128        60
OIR    2025250     91400   19.0700 -110.2800      13.4       198       139        60
OIR    2025250     91400   19.0700 -110.4300      21.4       115       139        60
OIR    2025250     91400   19.0700 -110.4900      18.4       111       143        60
OIR    2025250     91400   19.0700 -110.5000      18.3       110       141        60
OIR    2025250     91400   19.0700 -111.4100      11.8        66       141        60
OIR    2025250     91400   19.0700 -111.4200      12.7        79       141        60
OIR    2025250     91400   19.0700 -111.4300      15.0        94       142        60
OIR    2025250     91400   19.0700 -111.4400      16.3       100       135        60
OIR    2025250     91400   19.0700 -111.4500      16.7       104       129        60
OIR    2025250     91400   19.0700 -111.4600      16.8       112       129        60
OIR    2025250     91400   19.0700 -111.4700      16.6       115       131        60
OIR    2025250     91400   19.0700 -111.4800      16.3       117       132        60
OIR    2025250     91400   19.0700 -111.4900      15.8       119       130        60
OIR    2025250     91400   19.0700 -111.5000      15.1       120       128        60
OIR    2025250     91400   19.0700 -111.5100      14.3       119       125        60
OIR    2025250     91400   19.0700 -111.5200      13.6       118       123        60
OIR    2025250     91400   19.0700 -111.5300      13.1       116       123        60
OIR    2025250     91400   19.0700 -111.5400      12.2       111       124        60
OIR    2025250     91400   19.0700 -111.5500      11.7       107       125        60
OIR    2025250     91400   19.0700 -111.5600      11.6       108       130        60
OIR    2025250     91400   19.0700 -111.5700      11.6       108       135        60
OIR    2025250     91400   19.0700 -111.5800      11.5       108       137        60
OIR    2025250     91400   19.0700 -111.5900      11.1       104       137        60
OIR    2025250     91400   19.0700 -111.6000      10.2        94       140        60
OIR    2025250     91400   19.0700 -111.7400      14.3        73       142        60
OIR    2025250     91400   19.0700 -111.7500      14.3        73       141        60
OIR    2025250     91400   19.0700 -111.7600      13.1        75       140        60
OIR    2025250     91400   19.0700 -113.0000       7.3       163       142        60
OIR    2025250     91400   19.0700 -113.0100       7.6       169       141        60
OIR    2025250     91400   19.0700 -113.0200       7.8       172       139        60
OIR    2025250     91400   19.0700 -113.0300       7.9       173       139        60
OIR    2025250     91400   19.0700 -113.0400       7.9       174       139        60
OIR    2025250     91400   19.0700 -113.0500       7.9       174       138        60
OIR    2025250     91400   19.0700 -113.0600       7.9       174       137        60
OIR    2025250     91400   19.0700 -113.0700       7.9       174       136        60
OIR    2025250     91400   19.0700 -113.0800       7.9       174       133        60
OIR    2025250     91400   19.0700 -113.0900       7.9       174       130        60
OIR    2025250     91400   19.0700 -113.1000       8.0       175       132        60
OIR    2025250     91400   19.0700 -113.1100       7.9       175       135        60
OIR    2025250     91400   19.0700 -113.1200       7.9       175       134        60
OIR    2025250     91400   19.0700 -113.1300       7.9       175       132        60
OIR    2025250     91400   19.0700 -113.1400       7.9       175       130        60
OIR    2025250     91400   19.0700 -113.1500       7.9       175       130        60
OIR    2025250     91400   19.0700 -113.1600       7.9       175       129        60
OIR    2025250     91400   19.0700 -113.1700       7.9       175       126        60
OIR    2025250     91400   19.0700 -113.1800       8.0       176       123        60
OIR    2025250     91400   19.0700 -113.1900       8.0       176       121        60
OIR    2025250     91400   19.0700 -113.2000       8.0       176       120        60
OIR    2025250     91400   19.0700 -113.2100       8.0       176       120        60
OIR    2025250     91400   19.0700 -113.2200       8.0       176       120        60
OIR    2025250     91400   19.0700 -113.2300       8.0       176       120        60
OIR    2025250     91400   19.0700 -113.2400       8.0       176       116        60
OIR    2025250     91400   19.0700 -113.2500       8.0       176       115        60
OIR    2025250     91400   19.0700 -113.2600       8.0       176       114        60
OIR    2025250     91400   19.0700 -113.2700       8.0       176       113        60
OIR    2025250     91400   19.0700 -113.2800       8.0       176       113        60
OIR    2025250     91400   19.0700 -113.2900       8.0       176       114        60
OIR    2025250     91400   19.0700 -113.3000       8.0       176       114        60
OIR    2025250     91400   19.0700 -113.3100       8.1       176       112        60
OIR    2025250     91400   19.0700 -113.3200       8.1       176       110        60
OIR    2025250     91400   19.0700 -113.3300       8.1       176       110        60
OIR    2025250     91400   19.0700 -113.3400       8.1       176       111        60
OIR    2025250     91400   19.0700 -113.3500       8.1       176       110        60
OIR    2025250     91400   19.0700 -113.3600       8.2       176       108        60
OIR    2025250     91400   19.0700 -113.3700       8.2       176       107        60
OIR    2025250     91400   19.0700 -113.3800       8.3       176       107        60
OIR    2025250     91400   19.0700 -113.3900       8.4       176       105        60
OIR    2025250     91400   19.0700 -113.4000       8.4       176       105        60
OIR    2025250     91400   19.0700 -113.4100       8.5       176       107        60
OIR    2025250     91400   19.0700 -113.4200       8.5       176       107        60
OIR    2025250     91400   19.0700 -113.4300       8.6       176       107        60
OIR    2025250     91400   19.0700 -113.4400       8.6       176       107        60
OIR    2025250     91400   19.0700 -113.4500       8.6       176       105        60
OIR    2025250     91400   19.0700 -113.4600       8.7       176       105        60
OIR    2025250     91400   19.0700 -113.4700       8.7       176       105        60
OIR    2025250     91400   19.0700 -113.4800       8.7       176       107        60
OIR    2025250     91400   19.0700 -113.4900       8.8       176       107        60
OIR    2025250     91400   19.0700 -113.5000       8.8       176       105        60
OIR    2025250     91400   19.0700 -113.5100       8.9       176       105        60
OIR    2025250     91400   19.0700 -113.5200       8.9       176       105        60
OIR    2025250     91400   19.0700 -113.5300       9.0       176       105        60
OIR    2025250     91400   19.0700 -113.5400       9.0       176       105        60
OIR    2025250     91400   19.0700 -113.5500       9.1       176       105        60
OIR    2025250     91400   19.0700 -113.5600       9.1       176       107        60
OIR    2025250     91400   19.0700 -113.5700       9.2       176       108        60
OIR    2025250     91400   19.0700 -113.5800       9.2       176       109        60
OIR    2025250     91400   19.0700 -113.5900       9.2       176       110        60
OIR    2025250     91400   19.0700 -113.6000       9.3       176       110        60
OIR    2025250     91400   19.0700 -113.6100       9.3       176       111        60
OIR    2025250     91400   19.0700 -113.6200       9.3       177       111        60
OIR    2025250     91400   19.0700 -113.6300       9.3       177       111        60
OIR    2025250     91400   19.0700 -113.6400       9.3       177       112        60
OIR    2025250     91400   19.0700 -113.6500       9.3       177       113        60
OIR    2025250     91400   19.0700 -113.6600       9.3       177       113        60
OIR    2025250     91400   19.0700 -113.6700       9.3       177       115        60
OIR    2025250     91400   19.0700 -113.6800       9.4       178       116        60
OIR    2025250     91400   19.0700 -113.6900       9.5       179       116        60
OIR    2025250     91400   19.0700 -113.7000       9.7       180       116        60
OIR    2025250     91400   19.0700 -113.7100       9.9       181       116        60
OIR    2025250     91400   19.0700 -113.7200      10.0       182       116        60
OIR    2025250     91400   19.0700 -113.7300      10.0       182       116        60
OIR    2025250     91400   19.0700 -113.7400      10.1       183       116        60
OIR    2025250     91400   19.0700 -113.7500      10.2       183       117        60
OIR    2025250     91400   19.0700 -113.7600      10.2       183       117        60
OIR    2025250     91400   19.0700 -113.7700      10.3       183       117        60
OIR    2025250     91400   19.0700 -113.7800      10.4       184       116        60
OIR    2025250     91400   19.0700 -113.7900      10.5       184       116        60
OIR    2025250     91400   19.0700 -113.8000      10.5       184       115        60
OIR    2025250     91400   19.0700 -113.8100      10.6       185       116        60
OIR    2025250     91400   19.0700 -113.8200      10.6       185       116        60
OIR    2025250     91400   19.0700 -113.8300      10.6       185       116        60
OIR    2025250     91400   19.0700 -113.8400      10.7       185       115        60
OIR    2025250     91400   19.0700 -113.8500      10.7       185       113        60
OIR    2025250     91400   19.0700 -113.8600      10.7       186       114        60
OIR    2025250     91400   19.0700 -113.8700      10.8       186       116        60
OIR    2025250     91400   19.0700 -113.8800      10.8       186       116        60
OIR    2025250     91400   19.0700 -113.8900      10.8       186       116        60
OIR    2025250     91400   19.0700 -113.9000      10.9       186       116        60
OIR    2025250     91400   19.0700 -113.9100      10.9       187       116        60
OIR    2025250     91400   19.0700 -113.9200      10.9       187       116        60
OIR    2025250     91400   19.0700 -113.9300      10.9       187       116        60
OIR    2025250     91400   19.0700 -113.9400      10.9       187       116        60
OIR    2025250     91400   19.0700 -113.9500      10.9       187       117        60
OIR    2025250     91400   19.0700 -113.9600      10.9       187       119        60
OIR    2025250     91400   19.0700 -113.9700      11.0       187       119        60
OIR    2025250     91400   19.0700 -113.9800      11.0       188       117        60
OIR    2025250     91400   19.0700 -113.9900      11.0       188       116        60
OIR    2025250     91400   19.0700 -114.0000      11.0       188       116        60
OIR    2025250     91400   19.0700 -114.0100      11.0       188       116        60
OIR    2025250     91400   19.0700 -114.0200      11.0       188       116        60
OIR    2025250     91400   19.0700 -114.0300      10.9       188       116        60
OIR    2025250     91400   19.0700 -114.0400      10.9       188       116        60
OIR    2025250     91400   19.0700 -114.0500      10.9       188       115        60
OIR    2025250     91400   19.0700 -114.0600      10.9       188       115        60
OIR    2025250     91400   19.0700 -114.0700      10.9       188       116        60
OIR    2025250     91400   19.0700 -114.0800      10.9       188       116        60
OIR    2025250     91400   19.0700 -114.0900      10.9       188       116        60
OIR    2025250     91400   19.0700 -114.1000      10.9       188       116        60
OIR    2025250     91400   19.0700 -114.1100      10.9       188       119        60
OIR    2025250     91400   19.0700 -114.1200      10.8       188       121        60
OIR    2025250     91400   19.0700 -114.1300      10.8       188       121        60
OIR    2025250     91400   19.0700 -114.1400      10.8       188       121        60
OIR    2025250     91400   19.0700 -114.1500      10.8       188       121        60
OIR    2025250     91400   19.0700 -114.1600      10.8       188       121        60
OIR    2025250     91400   19.0700 -114.1700      10.8       188       122        60
OIR    2025250     91400   19.0700 -114.1800      10.8       188       126        60
OIR    2025250     91400   19.0700 -114.1900      10.8       188       130        60
OIR    2025250     91400   19.0700 -114.2000      10.8       188       132        60
OIR    2025250     91400   19.0700 -114.2100      10.9       188       134        60
OIR    2025250     91400   19.0700 -114.2200      10.9       188       136        60
OIR    2025250     91400   19.0700 -114.2300      11.0       188       140        60
OIR    2025250     91400   19.0700 -114.2400      11.0       188       141        60
OIR    2025250     91400   19.0700 -114.2500      11.0       188       138        60
OIR    2025250     91400   19.0700 -114.2600      11.0       188       136        60
OIR    2025250     91400   19.0700 -114.2700      11.1       188       139        60
OIR    2025250     91400   19.0700 -114.5500      10.9       189       136        60
OIR    2025250     91400   19.0700 -114.5600      10.9       189       138        60
OIR    2025250     91400   19.0700 -116.1000       7.2       179       141        60
OIR    2025250     91400   19.0700 -116.1100       7.3       179       140        60
OIR    2025250     91400   19.0700 -116.1200       7.2       178       139        60
OIR    2025250     91400   19.0700 -116.1300       7.2       178       141        60
OIR    2025250     91400   19.0700 -116.1400       7.2       178       142        60
OIR    2025250     91400   19.0600 -110.1800      50.3       171       141        60
OIR    2025250     91400   19.0600 -110.1900      40.7       180       135        60
OIR    2025250     91400   19.0600 -110.2300      13.0        85       138        60
OIR    2025250     91400   19.0600 -110.2600       5.2       169       115        60
OIR    2025250     91400   19.0600 -110.2700       9.2       180       122        60
OIR    2025250     91400   19.0600 -110.2800      15.2       200       135        60
OIR    2025250     91400   19.0600 -110.3700      34.4       114       140        60
OIR    2025250     91400   19.0600 -110.5300      18.4       104       140        60
OIR    2025250     91400   19.0600 -110.5400      18.4       104       136        60
OIR    2025250     91400   19.0600 -110.5500      18.3       104       132        60
OIR    2025250     91400   19.0600 -111.4100      13.1        82       139        60
OIR    2025250     91400   19.0600 -111.4200      15.8        96       139        60
OIR    2025250     91400   19.0600 -111.4300      16.8       100       139        60
OIR    2025250     91400   19.0600 -111.4400      16.9       102       134        60
OIR    2025250     91400   19.0600 -111.4500      17.1       104       128        60
OIR    2025250     91400   19.0600 -111.4600      16.8       110       124        60
OIR    2025250     91400   19.0600 -111.4700      16.4       112       125        60
OIR    2025250     91400   19.0600 -111.4800      16.0       114       125        60
OIR    2025250     91400   19.0600 -111.4900      15.6       117       123        60
OIR    2025250     91400   19.0600 -111.5000      15.2       118       121        60
OIR    2025250     91400   19.0600 -111.5100      14.7       118       117        60
OIR    2025250     91400   19.0600 -111.5200      14.0       118       114        60
OIR    2025250     91400   19.0600 -111.5300      13.4       116       112        60
OIR    2025250     91400   19.0600 -111.5400      12.5       110       114        60
OIR    2025250     91400   19.0600 -111.5500      12.1       108       116        60
OIR    2025250     91400   19.0600 -111.5600      11.9       109       122        60
OIR    2025250     91400   19.0600 -111.5700      11.8       108       127        60
OIR    2025250     91400   19.0600 -111.5800      11.7       108       131        60
OIR    2025250     91400   19.0600 -111.5900      11.2       101       133        60
OIR    2025250     91400   19.0600 -111.6000      10.2        91       135        60
OIR    2025250     91400   19.0600 -111.6100      10.1        90       138        60
OIR    2025250     91400   19.0600 -111.6200      10.0        89       141        60
OIR    2025250     91400   19.0600 -111.6300       9.9        89       141        60
OIR    2025250     91400   19.0600 -111.6400      10.0        87       140        60
OIR    2025250     91400   19.0600 -111.6500      10.7        81       140        60
OIR    2025250     91400   19.0600 -111.6600      11.0        77       139        60
OIR    2025250     91400   19.0600 -111.6700      11.7        75       139        60
OIR    2025250     91400   19.0600 -111.6800      12.2        73       141        60
OIR    2025250     91400   19.0600 -111.7500      14.3        73       142        60
OIR    2025250     91400   19.0600 -111.7600      13.1        75       139        60
OIR    2025250     91400   19.0600 -111.7700      13.1        75       142        60
OIR    2025250     91400   19.0600 -113.0300       7.8       172       140        60
OIR    2025250     91400   19.0600 -113.0400       7.9       173       136        60
OIR    2025250     91400   19.0600 -113.0500       7.9       174       134        60
OIR    2025250     91400   19.0600 -113.0600       7.9       174       134        60
OIR    2025250     91400   19.0600 -113.0700       7.9       174       134        60
OIR    2025250     91400   19.0600 -113.0800       7.9       174       133        60
OIR    2025250     91400   19.0600 -113.0900       7.9       174       131        60
OIR    2025250     91400   19.0600 -113.1000       7.9       174       133        60
OIR    2025250     91400   19.0600 -113.1100       7.9       175       135        60
OIR    2025250     91400   19.0600 -113.1200       7.9       175       135        60
OIR    2025250     91400   19.0600 -113.1300       7.9       175       131        60
OIR    2025250     91400   19.0600 -113.1400       7.9       175       127        60
OIR    2025250     91400   19.0600 -113.1500       7.9       175       129        60
OIR    2025250     91400   19.0600 -113.1600       7.9       175       131        60
OIR    2025250     91400   19.0600 -113.1700       7.9       175       129        60
OIR    2025250     91400   19.0600 -113.1800       7.9       176       127        60
OIR    2025250     91400   19.0600 -113.1900       7.9       176       125        60
OIR    2025250     91400   19.0600 -113.2000       8.0       176       123        60
OIR    2025250     91400   19.0600 -113.2100       8.0       176       120        60
OIR    2025250     91400   19.0600 -113.2200       8.0       176       120        60
OIR    2025250     91400   19.0600 -113.2300       8.0       176       120        60
OIR    2025250     91400   19.0600 -113.2400       8.0       176       117        60
OIR    2025250     91400   19.0600 -113.2500       8.0       176       116        60
OIR    2025250     91400   19.0600 -113.2600       8.0       176       115        60
OIR    2025250     91400   19.0600 -113.2700       8.0       176       114        60
OIR    2025250     91400   19.0600 -113.2800       8.0       176       114        60
OIR    2025250     91400   19.0600 -113.2900       8.0       176       114        60
OIR    2025250     91400   19.0600 -113.3000       8.0       176       114        60
OIR    2025250     91400   19.0600 -113.3100       8.0       176       113        60
OIR    2025250     91400   19.0600 -113.3200       8.1       176       111        60
OIR    2025250     91400   19.0600 -113.3300       8.1       176       111        60
OIR    2025250     91400   19.0600 -113.3400       8.1       176       111        60
OIR    2025250     91400   19.0600 -113.3500       8.1       176       110        60
OIR    2025250     91400   19.0600 -113.3600       8.2       176       109        60
OIR    2025250     91400   19.0600 -113.3700       8.2       176       108        60
OIR    2025250     91400   19.0600 -113.3800       8.3       176       107        60
OIR    2025250     91400   19.0600 -113.3900       8.4       176       105        60
OIR    2025250     91400   19.0600 -113.4000       8.4       176       105        60
OIR    2025250     91400   19.0600 -113.4100       8.5       176       105        60
OIR    2025250     91400   19.0600 -113.4200       8.5       176       107        60
OIR    2025250     91400   19.0600 -113.4300       8.6       176       107        60
OIR    2025250     91400   19.0600 -113.4400       8.6       176       107        60
OIR    2025250     91400   19.0600 -113.4500       8.7       176       107        60
OIR    2025250     91400   19.0600 -113.4600       8.7       175       107        60
OIR    2025250     91400   19.0600 -113.4700       8.7       175       107        60
OIR    2025250     91400   19.0600 -113.4800       8.8       175       107        60
OIR    2025250     91400   19.0600 -113.4900       8.8       175       105        60
OIR    2025250     91400   19.0600 -113.5000       8.9       175       105        60
OIR    2025250     91400   19.0600 -113.5100       8.9       176       105        60
OIR    2025250     91400   19.0600 -113.5200       9.0       176       105        60
OIR    2025250     91400   19.0600 -113.5300       9.0       176       105        60
OIR    2025250     91400   19.0600 -113.5400       9.1       176       105        60
OIR    2025250     91400   19.0600 -113.5500       9.1       176       105        60
OIR    2025250     91400   19.0600 -113.5600       9.2       176       107        60
OIR    2025250     91400   19.0600 -113.5700       9.2       176       108        60
OIR    2025250     91400   19.0600 -113.5800       9.2       176       109        60
OIR    2025250     91400   19.0600 -113.5900       9.3       176       110        60
OIR    2025250     91400   19.0600 -113.6000       9.3       176       112        60
OIR    2025250     91400   19.0600 -113.6100       9.3       176       112        60
OIR    2025250     91400   19.0600 -113.6200       9.3       176       113        60
OIR    2025250     91400   19.0600 -113.6300       9.3       177       112        60
OIR    2025250     91400   19.0600 -113.6400       9.3       177       112        60
OIR    2025250     91400   19.0600 -113.6500       9.3       177       112        60
OIR    2025250     91400   19.0600 -113.6600       9.3       177       113        60
OIR    2025250     91400   19.0600 -113.6700       9.4       177       114        60
OIR    2025250     91400   19.0600 -113.6800       9.4       178       116        60
OIR    2025250     91400   19.0600 -113.6900       9.6       179       116        60
OIR    2025250     91400   19.0600 -113.7000       9.8       181       116        60
OIR    2025250     91400   19.0600 -113.7100       9.9       182       115        60
OIR    2025250     91400   19.0600 -113.7200      10.0       182       115        60
OIR    2025250     91400   19.0600 -113.7300      10.1       183       115        60
OIR    2025250     91400   19.0600 -113.7400      10.2       183       116        60
OIR    2025250     91400   19.0600 -113.7500      10.2       183       116        60
OIR    2025250     91400   19.0600 -113.7600      10.3       183       116        60
OIR    2025250     91400   19.0600 -113.7700      10.3       184       117        60
OIR    2025250     91400   19.0600 -113.7800      10.4       184       117        60
OIR    2025250     91400   19.0600 -113.7900      10.5       184       116        60
OIR    2025250     91400   19.0600 -113.8000      10.6       185       116        60
OIR    2025250     91400   19.0600 -113.8100      10.6       185       115        60
OIR    2025250     91400   19.0600 -113.8200      10.6       185       116        60
OIR    2025250     91400   19.0600 -113.8300      10.6       185       116        60
OIR    2025250     91400   19.0600 -113.8400      10.7       185       116        60
OIR    2025250     91400   19.0600 -113.8500      10.7       186       116        60
OIR    2025250     91400   19.0600 -113.8600      10.8       186       116        60
OIR    2025250     91400   19.0600 -113.8700      10.8       186       116        60
OIR    2025250     91400   19.0600 -113.8800      10.8       186       116        60
OIR    2025250     91400   19.0600 -113.8900      10.9       186       116        60
OIR    2025250     91400   19.0600 -113.9000      10.9       187       115        60
OIR    2025250     91400   19.0600 -113.9100      10.9       187       115        60
OIR    2025250     91400   19.0600 -113.9200      11.0       187       116        60
OIR    2025250     91400   19.0600 -113.9300      11.0       187       116        60
OIR    2025250     91400   19.0600 -113.9400      11.0       187       117        60
OIR    2025250     91400   19.0600 -113.9500      11.0       187       119        60
OIR    2025250     91400   19.0600 -113.9600      11.0       188       117        60
OIR    2025250     91400   19.0600 -113.9700      11.0       188       117        60
OIR    2025250     91400   19.0600 -113.9800      11.0       188       119        60
OIR    2025250     91400   19.0600 -113.9900      11.0       188       119        60
OIR    2025250     91400   19.0600 -114.0000      11.0       188       117        60
OIR    2025250     91400   19.0600 -114.0100      11.0       188       117        60
OIR    2025250     91400   19.0600 -114.0200      11.0       188       117        60
OIR    2025250     91400   19.0600 -114.0300      11.0       188       117        60
OIR    2025250     91400   19.0600 -114.0400      11.0       188       116        60
OIR    2025250     91400   19.0600 -114.0500      11.0       188       116        60
OIR    2025250     91400   19.0600 -114.0600      11.0       188       116        60
OIR    2025250     91400   19.0600 -114.0700      11.0       188       117        60
OIR    2025250     91400   19.0600 -114.0800      11.0       188       119        60
OIR    2025250     91400   19.0600 -114.0900      11.0       188       119        60
OIR    2025250     91400   19.0600 -114.1000      10.9       188       120        60
OIR    2025250     91400   19.0600 -114.1100      10.9       188       121        60
OIR    2025250     91400   19.0600 -114.1200      10.9       188       123        60
OIR    2025250     91400   19.0600 -114.1300      10.9       188       123        60
OIR    2025250     91400   19.0600 -114.1400      10.9       188       122        60
OIR    2025250     91400   19.0600 -114.1500      10.8       188       121        60
OIR    2025250     91400   19.0600 -114.1600      10.8       188       122        60
OIR    2025250     91400   19.0600 -114.1700      10.8       189       123        60
OIR    2025250     91400   19.0600 -114.1800      10.8       189       126        60
OIR    2025250     91400   19.0600 -114.1900      10.9       189       129        60
OIR    2025250     91400   19.0600 -114.2000      10.9       189       132        60
OIR    2025250     91400   19.0600 -114.2100      11.0       189       136        60
OIR    2025250     91400   19.0600 -114.2200      11.0       189       138        60
OIR    2025250     91400   19.0600 -114.2300      11.0       189       139        60
OIR    2025250     91400   19.0600 -114.2400      11.1       188       140        60
OIR    2025250     91400   19.0600 -114.2500      11.1       188       139        60
OIR    2025250     91400   19.0600 -114.2600      11.1       188       138        60
OIR    2025250     91400   19.0600 -114.5500      10.9       189       141        60
OIR    2025250     91400   19.0600 -114.5600      10.9       189       140        60
OIR    2025250     91400   19.0600 -116.1100       7.3       179       142        60
OIR    2025250     91400   19.0600 -116.1200       7.3       179       141        60
OIR    2025250     91400   19.0600 -116.1300       7.3       178       142        60
OIR    2025250     91400   19.0500 -110.2500       4.0       160       139        60
OIR    2025250     91400   19.0500 -110.2600       5.5       167       132        60
OIR    2025250     91400   19.0500 -110.2700       8.0       175       132        60
OIR    2025250     91400   19.0500 -110.2800      13.8       197       140        60
OIR    2025250     91400   19.0500 -110.3600      68.7       118       131        60
OIR    2025250     91400   19.0500 -110.5100      18.2       105       142        60
OIR    2025250     91400   19.0500 -110.5200      18.2       104       136        60
OIR    2025250     91400   19.0500 -110.5300      18.2       104       129        60
OIR    2025250     91400   19.0500 -110.5400      18.2       104       124        60
OIR    2025250     91400   19.0500 -110.5500      18.2       104       117        60
OIR    2025250     91400   19.0500 -110.5600      18.1       104       129        60
OIR    2025250     91400   19.0500 -111.4100      15.8        98       139        60
OIR    2025250     91400   19.0500 -111.4200      16.8       100       137        60
OIR    2025250     91400   19.0500 -111.4300      16.9       101       135        60
OIR    2025250     91400   19.0500 -111.4400      17.0       101       131        60
OIR    2025250     91400   19.0500 -111.4500      17.2       103       125        60
OIR    2025250     91400   19.0500 -111.4600      17.0       107       120        60
OIR    2025250     91400   19.0500 -111.4700      16.4       110       116        60
OIR    2025250     91400   19.0500 -111.4800      15.9       112       115        60
OIR    2025250     91400   19.0500 -111.4900      15.5       115       114        60
OIR    2025250     91400   19.0500 -111.5000      15.1       116       112        60
OIR    2025250     91400   19.0500 -111.5100      14.7       117       110        60
OIR    2025250     91400   19.0500 -111.5200      14.1       116       108        60
OIR    2025250     91400   19.0500 -111.5300      13.5       114       107        60
OIR    2025250     91400   19.0500 -111.5400      12.9       111       109        60
OIR    2025250     91400   19.0500 -111.5500      12.5       109       111        60
OIR    2025250     91400   19.0500 -111.5600      12.3       109       114        60
OIR    2025250     91400   19.0500 -111.5700      12.1       108       116        60
OIR    2025250     91400   19.0500 -111.5800      11.9       107       120        60
OIR    2025250     91400   19.0500 -111.5900      11.5       104       122        60
OIR    2025250     91400   19.0500 -111.6000      10.4        94       124        60
OIR    2025250     91400   19.0500 -111.6100      10.1        89       126        60
OIR    2025250     91400   19.0500 -111.6200      10.1        88       127        60
OIR    2025250     91400   19.0500 -111.6300      10.0        87       131        60
OIR    2025250     91400   19.0500 -111.6400      10.0        87       134        60
OIR    2025250     91400   19.0500 -111.6500      10.1        85       137        60
OIR    2025250     91400   19.0500 -111.6600      10.2        81       139        60
OIR    2025250     91400   19.0500 -111.6700      10.4        79       140        60
OIR    2025250     91400   19.0500 -111.6800      11.2        77       142        60
OIR    2025250     91400   19.0500 -111.7600      13.1        76       139        60
OIR    2025250     91400   19.0500 -111.7700      13.2        75       140        60
OIR    2025250     91400   19.0500 -113.0400       7.8       172       139        60
OIR    2025250     91400   19.0500 -113.0500       7.9       173       135        60
OIR    2025250     91400   19.0500 -113.0600       7.9       173       134        60
OIR    2025250     91400   19.0500 -113.0700       7.9       174       133        60
OIR    2025250     91400   19.0500 -113.0800       7.9       174       133        60
OIR    2025250     91400   19.0500 -113.0900       7.9       174       133        60
OIR    2025250     91400   19.0500 -113.1000       7.9       174       134        60
OIR    2025250     91400   19.0500 -113.1100       7.9       175       136        60
OIR    2025250     91400   19.0500 -113.1200       7.9       175       136        60
OIR    2025250     91400   19.0500 -113.1300       7.9       175       131        60
OIR    2025250     91400   19.0500 -113.1400       7.9       175       125        60
OIR    2025250     91400   19.0500 -113.1500       7.9       175       127        60
OIR    2025250     91400   19.0500 -113.1600       7.9       175       131        60
OIR    2025250     91400   19.0500 -113.1700       7.9       175       132        60
OIR    2025250     91400   19.0500 -113.1800       7.9       175       131        60
OIR    2025250     91400   19.0500 -113.1900       7.9       176       129        60
OIR    2025250     91400   19.0500 -113.2000       7.9       176       125        60
OIR    2025250     91400   19.0500 -113.2100       8.0       176       121        60
OIR    2025250     91400   19.0500 -113.2200       8.0       176       120        60
OIR    2025250     91400   19.0500 -113.2300       8.0       176       119        60
OIR    2025250     91400   19.0500 -113.2400       8.0       176       117        60
OIR    2025250     91400   19.0500 -113.2500       8.0       176       116        60
OIR    2025250     91400   19.0500 -113.2600       8.0       176       116        60
OIR    2025250     91400   19.0500 -113.2700       8.0       176       115        60
OIR    2025250     91400   19.0500 -113.2800       8.0       176       114        60
OIR    2025250     91400   19.0500 -113.2900       8.0       176       113        60
OIR    2025250     91400   19.0500 -113.3000       8.0       176       111        60
OIR    2025250     91400   19.0500 -113.3100       8.0       176       112        60
OIR    2025250     91400   19.0500 -113.3200       8.1       176       112        60
OIR    2025250     91400   19.0500 -113.3300       8.1       176       111        60
OIR    2025250     91400   19.0500 -113.3400       8.1       176       110        60
OIR    2025250     91400   19.0500 -113.3500       8.1       176       110        60
OIR    2025250     91400   19.0500 -113.3600       8.2       176       109        60
OIR    2025250     91400   19.0500 -113.3700       8.2       176       109        60
OIR    2025250     91400   19.0500 -113.3800       8.3       176       107        60
OIR    2025250     91400   19.0500 -113.3900       8.4       176       105        60
OIR    2025250     91400   19.0500 -113.4000       8.4       176       105        60
OIR    2025250     91400   19.0500 -113.4100       8.5       176       105        60
OIR    2025250     91400   19.0500 -113.4200       8.6       176       107        60
OIR    2025250     91400   19.0500 -113.4300       8.6       175       105        60
OIR    2025250     91400   19.0500 -113.4400       8.6       175       105        60
OIR    2025250     91400   19.0500 -113.4500       8.7       175       105        60
OIR    2025250     91400   19.0500 -113.4600       8.7       175       105        60
OIR    2025250     91400   19.0500 -113.4700       8.7       175       107        60
OIR    2025250     91400   19.0500 -113.4800       8.8       175       107        60
OIR    2025250     91400   19.0500 -113.4900       8.8       175       107        60
OIR    2025250     91400   19.0500 -113.5000       8.9       175       105        60
OIR    2025250     91400   19.0500 -113.5100       9.0       175       105        60
OIR    2025250     91400   19.0500 -113.5200       9.0       175       105        60
OIR    2025250     91400   19.0500 -113.5300       9.1       176       105        60
OIR    2025250     91400   19.0500 -113.5400       9.1       176       105        60
OIR    2025250     91400   19.0500 -113.5500       9.2       176       105        60
OIR    2025250     91400   19.0500 -113.5600       9.2       176       107        60
OIR    2025250     91400   19.0500 -113.5700       9.2       176       108        60
OIR    2025250     91400   19.0500 -113.5800       9.3       176       108        60
OIR    2025250     91400   19.0500 -113.5900       9.3       176       110        60
OIR    2025250     91400   19.0500 -113.6000       9.3       176       111        60
OIR    2025250     91400   19.0500 -113.6100       9.3       176       111        60
OIR    2025250     91400   19.0500 -113.6200       9.3       176       112        60
OIR    2025250     91400   19.0500 -113.6300       9.3       176       112        60
OIR    2025250     91400   19.0500 -113.6400       9.3       177       111        60
OIR    2025250     91400   19.0500 -113.6500       9.4       177       111        60
OIR    2025250     91400   19.0500 -113.6600       9.4       177       112        60
OIR    2025250     91400   19.0500 -113.6700       9.4       177       113        60
OIR    2025250     91400   19.0500 -113.6800       9.5       178       115        60
OIR    2025250     91400   19.0500 -113.6900       9.7       180       116        60
OIR    2025250     91400   19.0500 -113.7000       9.9       181       116        60
OIR    2025250     91400   19.0500 -113.7100      10.0       182       115        60
OIR    2025250     91400   19.0500 -113.7200      10.1       183       114        60
OIR    2025250     91400   19.0500 -113.7300      10.1       183       114        60
OIR    2025250     91400   19.0500 -113.7400      10.2       183       114        60
OIR    2025250     91400   19.0500 -113.7500      10.2       183       116        60
OIR    2025250     91400   19.0500 -113.7600      10.3       184       116        60
OIR    2025250     91400   19.0500 -113.7700      10.4       184       117        60
OIR    2025250     91400   19.0500 -113.7800      10.5       184       119        60
OIR    2025250     91400   19.0500 -113.7900      10.5       184       117        60
OIR    2025250     91400   19.0500 -113.8000      10.6       185       116        60
OIR    2025250     91400   19.0500 -113.8100      10.6       185       116        60
OIR    2025250     91400   19.0500 -113.8200      10.6       185       116        60
OIR    2025250     91400   19.0500 -113.8300      10.7       185       116        60
OIR    2025250     91400   19.0500 -113.8400      10.7       186       116        60
OIR    2025250     91400   19.0500 -113.8500      10.8       186       119        60
OIR    2025250     91400   19.0500 -113.8600      10.8       186       119        60
OIR    2025250     91400   19.0500 -113.8700      10.9       186       117        60
OIR    2025250     91400   19.0500 -113.8800      10.9       187       116        60
OIR    2025250     91400   19.0500 -113.8900      10.9       187       116        60
OIR    2025250     91400   19.0500 -113.9000      11.0       187       115        60
OIR    2025250     91400   19.0500 -113.9100      11.0       187       115        60
OIR    2025250     91400   19.0500 -113.9200      11.0       187       115        60
OIR    2025250     91400   19.0500 -113.9300      11.0       187       116        60
OIR    2025250     91400   19.0500 -113.9400      11.0       187       119        60
OIR    2025250     91400   19.0500 -113.9500      11.0       188       117        60
OIR    2025250     91400   19.0500 -113.9600      11.0       188       116        60
OIR    2025250     91400   19.0500 -113.9700      11.1       188       116        60
OIR    2025250     91400   19.0500 -113.9800      11.1       188       117        60
OIR    2025250     91400   19.0500 -113.9900      11.1       188       120        60
OIR    2025250     91400   19.0500 -114.0000      11.1       188       119        60
OIR    2025250     91400   19.0500 -114.0100      11.1       188       119        60
OIR    2025250     91400   19.0500 -114.0200      11.1       188       119        60
OIR    2025250     91400   19.0500 -114.0300      11.1       188       119        60
OIR    2025250     91400   19.0500 -114.0400      11.0       188       117        60
OIR    2025250     91400   19.0500 -114.0500      11.0       188       116        60
OIR    2025250     91400   19.0500 -114.0600      11.0       188       116        60
OIR    2025250     91400   19.0500 -114.0700      11.0       188       119        60
OIR    2025250     91400   19.0500 -114.0800      11.0       188       121        60
OIR    2025250     91400   19.0500 -114.0900      11.0       188       122        60
OIR    2025250     91400   19.0500 -114.1000      11.0       188       123        60
OIR    2025250     91400   19.0500 -114.1100      11.0       188       124        60
OIR    2025250     91400   19.0500 -114.1200      11.0       188       125        60
OIR    2025250     91400   19.0500 -114.1300      10.9       188       126        60
OIR    2025250     91400   19.0500 -114.1400      10.9       189       124        60
OIR    2025250     91400   19.0500 -114.1500      10.9       189       123        60
OIR    2025250     91400   19.0500 -114.1600      10.9       189       124        60
OIR    2025250     91400   19.0500 -114.1700      10.9       190       125        60
OIR    2025250     91400   19.0500 -114.1800      10.9       190       127        60
OIR    2025250     91400   19.0500 -114.1900      11.0       190       129        60
OIR    2025250     91400   19.0500 -114.2000      11.0       189       132        60
OIR    2025250     91400   19.0500 -114.2100      11.1       189       136        60
OIR    2025250     91400   19.0500 -114.2200      11.1       189       139        60
OIR    2025250     91400   19.0500 -114.2300      11.1       189       140        60
OIR    2025250     91400   19.0400 -110.3500      57.7       123       141        60
OIR    2025250     91400   19.0400 -110.3600      49.7       110       138        60
OIR    2025250     91400   19.0400 -110.5300      18.0       104       141        60
OIR    2025250     91400   19.0400 -110.5400      18.0       104       140        60
OIR    2025250     91400   19.0400 -110.5500      18.0       104       138        60
OIR    2025250     91400   19.0400 -110.5600      18.0       104       140        60
OIR    2025250     91400   19.0400 -111.4000      15.4        97       141        60
OIR    2025250     91400   19.0400 -111.4100      16.6        99       137        60
OIR    2025250     91400   19.0400 -111.4200      16.9       100       132        60
OIR    2025250     91400   19.0400 -111.4300      17.0       100       128        60
OIR    2025250     91400   19.0400 -111.4400      17.1       101       124        60
OIR    2025250     91400   19.0400 -111.4500      17.2       103       120        60
OIR    2025250     91400   19.0400 -111.4600      17.1       106       115        60
OIR    2025250     91400   19.0400 -111.4700      16.5       109       112        60
OIR    2025250     91400   19.0400 -111.4800      16.0       110       108        60
OIR    2025250     91400   19.0400 -111.4900      15.3       111       105        60
OIR    2025250     91400   19.0400 -111.5000      14.9       112       104        60
OIR    2025250     91400   19.0400 -111.5100      14.4       112       104        60
OIR    2025250     91400   19.0400 -111.5200      13.9       111       104        60
OIR    2025250     91400   19.0400 -111.5300      13.6       110       103        60
OIR    2025250     91400   19.0400 -111.5400      12.9       108       104        60
OIR    2025250     91400   19.0400 -111.5500      12.7       107       105        60
OIR    2025250     91400   19.0400 -111.5600      12.5       108       107        60
OIR    2025250     91400   19.0400 -111.5700      12.3       108       108        60
OIR    2025250     91400   19.0400 -111.5800      12.1       107       109        60
OIR    2025250     91400   19.0400 -111.5900      11.8       106       111        60
OIR    2025250     91400   19.0400 -111.6000      10.7        98       112        60
OIR    2025250     91400   19.0400 -111.6100      10.1        90       113        60
OIR    2025250     91400   19.0400 -111.6200      10.0        88       113        60
OIR    2025250     91400   19.0400 -111.6300      10.0        87       117        60
OIR    2025250     91400   19.0400 -111.6400      10.0        86       126        60
OIR    2025250     91400   19.0400 -111.6500      10.0        84       133        60
OIR    2025250     91400   19.0400 -111.6600      10.1        82       138        60
OIR    2025250     91400   19.0400 -111.7700      13.2        76       140        60
OIR    2025250     91400   19.0400 -113.0000       7.0       156       142        60
OIR    2025250     91400   19.0400 -113.0400       7.6       169       142        60
OIR    2025250     91400   19.0400 -113.0500       7.7       171       141        60
OIR    2025250     91400   19.0400 -113.0600       7.8       172       137        60
OIR    2025250     91400   19.0400 -113.0700       7.8       173       134        60
OIR    2025250     91400   19.0400 -113.0800       7.9       173       135        60
OIR    2025250     91400   19.0400 -113.0900       7.9       173       136        60
OIR    2025250     91400   19.0400 -113.1000       7.9       174       137        60
OIR    2025250     91400   19.0400 -113.1100       7.9       174       137        60
OIR    2025250     91400   19.0400 -113.1200       7.9       175       136        60
OIR    2025250     91400   19.0400 -113.1300       7.9       175       132        60
OIR    2025250     91400   19.0400 -113.1400       7.9       175       127        60
OIR    2025250     91400   19.0400 -113.1500       7.9       175       126        60
OIR    2025250     91400   19.0400 -113.1600       7.9       175       128        60
OIR    2025250     91400   19.0400 -113.1700       7.9       175       128        60
OIR    2025250     91400   19.0400 -113.1800       7.9       175       128        60
OIR    2025250     91400   19.0400 -113.1900       7.9       175       127        60
OIR    2025250     91400   19.0400 -113.2000       7.9       175       124        60
OIR    2025250     91400   19.0400 -113.2100       7.9       175       122        60
OIR    2025250     91400   19.0400 -113.2200       7.9       175       121        60
OIR    2025250     91400   19.0400 -113.2300       8.0       176       121        60
OIR    2025250     91400   19.0400 -113.2400       8.0       176       120        60
OIR    2025250     91400   19.0400 -113.2500       8.0       176       120        60
OIR    2025250     91400   19.0400 -113.2600       8.0       176       119        60
OIR    2025250     91400   19.0400 -113.2700       8.0       176       116        60
OIR    2025250     91400   19.0400 -113.2800       8.0       176       115        60
OIR    2025250     91400   19.0400 -113.2900       8.0       176       113        60
OIR    2025250     91400   19.0400 -113.3000       8.0       175       112        60
OIR    2025250     91400   19.0400 -113.3100       8.0       176       112        60
OIR    2025250     91400   19.0400 -113.3200       8.1       176       112        60
OIR    2025250     91400   19.0400 -113.3300       8.1       176       111        60
OIR    2025250     91400   19.0400 -113.3400       8.1       176       111        60
OIR    2025250     91400   19.0400 -113.3500       8.1       176       110        60
OIR    2025250     91400   19.0400 -113.3600       8.2       176       109        60
OIR    2025250     91400   19.0400 -113.3700       8.2       176       109        60
OIR    2025250     91400   19.0400 -113.3800       8.3       176       108        60
OIR    2025250     91400   19.0400 -113.3900       8.4       176       107        60
OIR    2025250     91400   19.0400 -113.4000       8.5       176       105        60
OIR    2025250     91400   19.0400 -113.4100       8.5       175       105        60
OIR    2025250     91400   19.0400 -113.4200       8.6       175       107        60
OIR    2025250     91400   19.0400 -113.4300       8.6       175       105        60
OIR    2025250     91400   19.0400 -113.4400       8.6       175       105        60
OIR    2025250     91400   19.0400 -113.4500       8.7       175       105        60
OIR    2025250     91400   19.0400 -113.4600       8.7       175       107        60
OIR    2025250     91400   19.0400 -113.4700       8.8       175       107        60
OIR    2025250     91400   19.0400 -113.4800       8.8       175       107        60
OIR    2025250     91400   19.0400 -113.4900       8.9       175       107        60
OIR    2025250     91400   19.0400 -113.5000       8.9       175       105        60
OIR    2025250     91400   19.0400 -113.5100       9.0       175       104        60
OIR    2025250     91400   19.0400 -113.5200       9.1       175       104        60
OIR    2025250     91400   19.0400 -113.5300       9.1       175       104        60
OIR    2025250     91400   19.0400 -113.5400       9.2       175       105        60
OIR    2025250     91400   19.0400 -113.5500       9.2       176       107        60
OIR    2025250     91400   19.0400 -113.5600       9.3       176       108        60
OIR    2025250     91400   19.0400 -113.5700       9.3       176       108        60
OIR    2025250     91400   19.0400 -113.5800       9.3       176       108        60
OIR    2025250     91400   19.0400 -113.5900       9.3       176       109        60
OIR    2025250     91400   19.0400 -113.6000       9.4       176       110        60
OIR    2025250     91400   19.0400 -113.6100       9.4       176       110        60
OIR    2025250     91400   19.0400 -113.6200       9.4       176       111        60
OIR    2025250     91400   19.0400 -113.6300       9.4       176       110        60
OIR    2025250     91400   19.0400 -113.6400       9.4       176       110        60
OIR    2025250     91400   19.0400 -113.6500       9.4       177       110        60
OIR    2025250     91400   19.0400 -113.6600       9.4       177       111        60
OIR    2025250     91400   19.0400 -113.6700       9.4       178       112        60
OIR    2025250     91400   19.0400 -113.6800       9.5       178       114        60
OIR    2025250     91400   19.0400 -113.6900       9.8       180       115        60
OIR    2025250     91400   19.0400 -113.7000      10.0       182       115        60
OIR    2025250     91400   19.0400 -113.7100      10.1       182       115        60
OIR    2025250     91400   19.0400 -113.7200      10.1       183       114        60
OIR    2025250     91400   19.0400 -113.7300      10.2       183       114        60
OIR    2025250     91400   19.0400 -113.7400      10.2       183       113        60
OIR    2025250     91400   19.0400 -113.7500      10.3       183       115        60
OIR    2025250     91400   19.0400 -113.7600      10.3       184       116        60
OIR    2025250     91400   19.0400 -113.7700      10.4       184       117        60
OIR    2025250     91400   19.0400 -113.7800      10.5       184       117        60
OIR    2025250     91400   19.0400 -113.7900      10.5       185       117        60
OIR    2025250     91400   19.0400 -113.8000      10.6       185       117        60
OIR    2025250     91400   19.0400 -113.8100      10.6       185       117        60
OIR    2025250     91400   19.0400 -113.8200      10.7       185       116        60
OIR    2025250     91400   19.0400 -113.8300      10.7       186       115        60
OIR    2025250     91400   19.0400 -113.8400      10.8       186       116        60
OIR    2025250     91400   19.0400 -113.8500      10.8       186       119        60
OIR    2025250     91400   19.0400 -113.8600      10.9       186       119        60
OIR    2025250     91400   19.0400 -113.8700      10.9       187       117        60
OIR    2025250     91400   19.0400 -113.8800      11.0       187       116        60
OIR    2025250     91400   19.0400 -113.8900      11.0       187       116        60
OIR    2025250     91400   19.0400 -113.9000      11.0       187       116        60
OIR    2025250     91400   19.0400 -113.9100      11.0       187       116        60
OIR    2025250     91400   19.0400 -113.9200      11.1       187       116        60
OIR    2025250     91400   19.0400 -113.9300      11.1       188       117        60
OIR    2025250     91400   19.0400 -113.9400      11.1       188       119        60
OIR    2025250     91400   19.0400 -113.9500      11.1       188       119        60
OIR    2025250     91400   19.0400 -113.9600      11.1       188       117        60
OIR    2025250     91400   19.0400 -113.9700      11.1       188       116        60
OIR    2025250     91400   19.0400 -113.9800      11.1       188       117        60
OIR    2025250     91400   19.0400 -113.9900      11.1       188       120        60
OIR    2025250     91400   19.0400 -114.0000      11.1       188       120        60
OIR    2025250     91400   19.0400 -114.0100      11.1       188       120        60
OIR    2025250     91400   19.0400 -114.0200      11.1       188       119        60
OIR    2025250     91400   19.0400 -114.0300      11.1       188       120        60
OIR    2025250     91400   19.0400 -114.0400      11.1       188       120        60
OIR    2025250     91400   19.0400 -114.0500      11.1       188       119        60
OIR    2025250     91400   19.0400 -114.0600      11.1       188       119        60
OIR    2025250     91400   19.0400 -114.0700      11.1       188       120        60
OIR    2025250     91400   19.0400 -114.0800      11.0       188       122        60
OIR    2025250     91400   19.0400 -114.0900      11.0       188       123        60
OIR    2025250     91400   19.0400 -114.1000      11.0       188       124        60
OIR    2025250     91400   19.0400 -114.1100      11.0       188       126        60
OIR    2025250     91400   19.0400 -114.1200      11.0       188       126        60
OIR    2025250     91400   19.0400 -114.1300      11.0       189       127        60
OIR    2025250     91400   19.0400 -114.1400      11.0       189       126        60
OIR    2025250     91400   19.0400 -114.1500      11.0       189       125        60
OIR    2025250     91400   19.0400 -114.1600      11.0       190       126        60
OIR    2025250     91400   19.0400 -114.1700      11.0       190       127        60
OIR    2025250     91400   19.0400 -114.1800      11.0       190       129        60
OIR    2025250     91400   19.0400 -114.1900      11.0       190       130        60
OIR    2025250     91400   19.0400 -114.2000      11.1       190       133        60
OIR    2025250     91400   19.0400 -114.2100      11.1       189       136        60
OIR    2025250     91400   19.0400 -114.2200      11.2       189       139        60
OIR    2025250     91400   19.0400 -114.2300      11.2       189       141        60
OIR    2025250     91400   19.0300 -110.3600      34.0       105       142        60
OIR    2025250     91400   19.0300 -110.4400      16.9       100       142        60
OIR    2025250     91400   19.0300 -110.4500      17.4        99       143        60
OIR    2025250     91400   19.0300 -110.4600      17.4        97       142        60
OIR    2025250     91400   19.0300 -110.4700      17.4        96       143        60
OIR    2025250     91400   19.0300 -110.7500      18.9        96       131        60
OIR    2025250     91400   19.0300 -110.7600      19.0        96       146        60
OIR    2025250     91400   19.0300 -111.3900      15.5        93       138        60
OIR    2025250     91400   19.0300 -111.4000      16.7        99       134        60
OIR    2025250     91400   19.0300 -111.4100      17.0       100       131        60
OIR    2025250     91400   19.0300 -111.4200      17.1       100       125        60
OIR    2025250     91400   19.0300 -111.4300      17.2       100       119        60
OIR    2025250     91400   19.0300 -111.4400      17.2       101       114        60
OIR    2025250     91400   19.0300 -111.4500      17.1       102       111        60
OIR    2025250     91400   19.0300 -111.4600      16.9       105       109        60
OIR    2025250     91400   19.0300 -111.4700      16.4       107       107        60
OIR    2025250     91400   19.0300 -111.4800      15.8       109       104        60
OIR    2025250     91400   19.0300 -111.4900      15.2       109       104        60
OIR    2025250     91400   19.0300 -111.5000      14.7       110       104        60
OIR    2025250     91400   19.0300 -111.5100      14.3       110       103        60
OIR    2025250     91400   19.0300 -111.5200      13.8       109       103        60
OIR    2025250     91400   19.0300 -111.5300      13.5       109       103        60
OIR    2025250     91400   19.0300 -111.5400      13.1       108       103        60
OIR    2025250     91400   19.0300 -111.5500      12.9       107       104        60
OIR    2025250     91400   19.0300 -111.5600      12.6       107       104        60
OIR    2025250     91400   19.0300 -111.5700      12.5       107       105        60
OIR    2025250     91400   19.0300 -111.5800      12.2       106       107        60
OIR    2025250     91400   19.0300 -111.5900      11.8       105       108        60
OIR    2025250     91400   19.0300 -111.6000      11.0        99       109        60
OIR    2025250     91400   19.0300 -111.6100      10.3        90       110        60
OIR    2025250     91400   19.0300 -111.6200      10.1        88       110        60
OIR    2025250     91400   19.0300 -111.6300      10.0        87       112        60
OIR    2025250     91400   19.0300 -111.6400      10.1        85       117        60
OIR    2025250     91400   19.0300 -111.6500      10.1        83       124        60
OIR    2025250     91400   19.0300 -111.6600      10.1        82       131        60
OIR    2025250     91400   19.0300 -111.6700      10.1        82       138        60
OIR    2025250     91400   19.0300 -111.7700      13.2        78       141        60
OIR    2025250     91400   19.0300 -113.0000       7.0       153       142        60
OIR    2025250     91400   19.0300 -113.0100       7.0       154       141        60
OIR    2025250     91400   19.0300 -113.0500       7.4       166       142        60
OIR    2025250     91400   19.0300 -113.0600       7.5       169       140        60
OIR    2025250     91400   19.0300 -113.0700       7.6       171       137        60
OIR    2025250     91400   19.0300 -113.0800       7.7       171       136        60
OIR    2025250     91400   19.0300 -113.0900       7.8       172       138        60
OIR    2025250     91400   19.0300 -113.1000       7.8       173       139        60
OIR    2025250     91400   19.0300 -113.1100       7.8       173       138        60
OIR    2025250     91400   19.0300 -113.1200       7.8       174       136        60
OIR    2025250     91400   19.0300 -113.1300       7.9       175       133        60
OIR    2025250     91400   19.0300 -113.1400       7.9       175       129        60
OIR    2025250     91400   19.0300 -113.1500       7.9       175       127        60
OIR    2025250     91400   19.0300 -113.1600       7.9       175       127        60
OIR    2025250     91400   19.0300 -113.1700       7.9       175       127        60
OIR    2025250     91400   19.0300 -113.1800       7.9       175       125        60
OIR    2025250     91400   19.0300 -113.1900       7.9       175       124        60
OIR    2025250     91400   19.0300 -113.2000       7.9       175       123        60
OIR    2025250     91400   19.0300 -113.2100       7.9       175       122        60
OIR    2025250     91400   19.0300 -113.2200       7.9       175       122        60
OIR    2025250     91400   19.0300 -113.2300       7.9       175       122        60
OIR    2025250     91400   19.0300 -113.2400       7.9       175       122        60
OIR    2025250     91400   19.0300 -113.2500       7.9       175       122        60
OIR    2025250     91400   19.0300 -113.2600       8.0       175       123        60
OIR    2025250     91400   19.0300 -113.2700       8.0       175       120        60
OIR    2025250     91400   19.0300 -113.2800       8.0       175       116        60
OIR    2025250     91400   19.0300 -113.2900       8.0       175       115        60
OIR    2025250     91400   19.0300 -113.3000       8.0       175       113        60
OIR    2025250     91400   19.0300 -113.3100       8.0       175       112        60
OIR    2025250     91400   19.0300 -113.3200       8.1       175       112        60
OIR    2025250     91400   19.0300 -113.3300       8.1       175       111        60
OIR    2025250     91400   19.0300 -113.3400       8.1       175       111        60
OIR    2025250     91400   19.0300 -113.3500       8.1       175       111        60
OIR    2025250     91400   19.0300 -113.3600       8.2       175       110        60
OIR    2025250     91400   19.0300 -113.3700       8.3       175       109        60
OIR    2025250     91400   19.0300 -113.3800       8.3       175       108        60
OIR    2025250     91400   19.0300 -113.3900       8.4       175       108        60
OIR    2025250     91400   19.0300 -113.4000       8.5       175       108        60
OIR    2025250     91400   19.0300 -113.4100       8.5       175       107        60
OIR    2025250     91400   19.0300 -113.4200       8.6       175       107        60
OIR    2025250     91400   19.0300 -113.4300       8.6       175       108        60
OIR    2025250     91400   19.0300 -113.4400       8.7       175       108        60
OIR    2025250     91400   19.0300 -113.4500       8.7       175       108        60
OIR    2025250     91400   19.0300 -113.4600       8.8       175       108        60
OIR    2025250     91400   19.0300 -113.4700       8.8       175       108        60
OIR    2025250     91400   19.0300 -113.4800       8.9       175       108        60
OIR    2025250     91400   19.0300 -113.4900       8.9       175       108        60
OIR    2025250     91400   19.0300 -113.5000       9.0       175       107        60
OIR    2025250     91400   19.0300 -113.5100       9.1       175       105        60
OIR    2025250     91400   19.0300 -113.5200       9.1       175       105        60
OIR    2025250     91400   19.0300 -113.5300       9.2       175       105        60
OIR    2025250     91400   19.0300 -113.5400       9.2       175       107        60
OIR    2025250     91400   19.0300 -113.5500       9.3       175       108        60
OIR    2025250     91400   19.0300 -113.5600       9.3       175       109        60
OIR    2025250     91400   19.0300 -113.5700       9.4       176       109        60
OIR    2025250     91400   19.0300 -113.5800       9.4       176       109        60
OIR    2025250     91400   19.0300 -113.5900       9.4       176       110        60
OIR    2025250     91400   19.0300 -113.6000       9.4       176       111        60
OIR    2025250     91400   19.0300 -113.6100       9.4       176       111        60
OIR    2025250     91400   19.0300 -113.6200       9.4       176       111        60
OIR    2025250     91400   19.0300 -113.6300       9.4       176       111        60
OIR    2025250     91400   19.0300 -113.6400       9.4       176       111        60
OIR    2025250     91400   19.0300 -113.6500       9.4       177       110        60
OIR    2025250     91400   19.0300 -113.6600       9.4       177       111        60
OIR    2025250     91400   19.0300 -113.6700       9.5       177       113        60
OIR    2025250     91400   19.0300 -113.6800       9.6       178       114        60
OIR    2025250     91400   19.0300 -113.6900       9.9       181       114        60
OIR    2025250     91400   19.0300 -113.7000      10.1       182       115        60
OIR    2025250     91400   19.0300 -113.7100      10.1       183       115        60
OIR    2025250     91400   19.0300 -113.7200      10.2       183       115        60
OIR    2025250     91400   19.0300 -113.7300      10.2       183       114        60
OIR    2025250     91400   19.0300 -113.7400      10.3       183       113        60
OIR    2025250     91400   19.0300 -113.7500      10.3       184       114        60
OIR    2025250     91400   19.0300 -113.7600      10.3       184       116        60
OIR    2025250     91400   19.0300 -113.7700      10.4       184       116        60
OIR    2025250     91400   19.0300 -113.7800      10.5       184       117        60
OIR    2025250     91400   19.0300 -113.7900      10.5       185       117        60
OIR    2025250     91400   19.0300 -113.8000      10.6       185       119        60
OIR    2025250     91400   19.0300 -113.8100      10.6       185       120        60
OIR    2025250     91400   19.0300 -113.8200      10.7       186       117        60
OIR    2025250     91400   19.0300 -113.8300      10.8       186       116        60
OIR    2025250     91400   19.0300 -113.8400      10.8       186       116        60
OIR    2025250     91400   19.0300 -113.8500      10.9       186       117        60
OIR    2025250     91400   19.0300 -113.8600      10.9       187       119        60
OIR    2025250     91400   19.0300 -113.8700      11.0       187       117        60
OIR    2025250     91400   19.0300 -113.8800      11.0       187       116        60
OIR    2025250     91400   19.0300 -113.8900      11.1       187       117        60
OIR    2025250     91400   19.0300 -113.9000      11.1       187       119        60
OIR    2025250     91400   19.0300 -113.9100      11.1       188       119        60
OIR    2025250     91400   19.0300 -113.9200      11.1       188       119        60
OIR    2025250     91400   19.0300 -113.9300      11.1       188       119        60
OIR    2025250     91400   19.0300 -113.9400      11.1       188       120        60
OIR    2025250     91400   19.0300 -113.9500      11.1       188       119        60
OIR    2025250     91400   19.0300 -113.9600      11.1       188       117        60
OIR    2025250     91400   19.0300 -113.9700      11.1       188       116        60
OIR    2025250     91400   19.0300 -113.9800      11.1       188       117        60
OIR    2025250     91400   19.0300 -113.9900      11.1       188       120        60
OIR    2025250     91400   19.0300 -114.0000      11.1       188       120        60
OIR    2025250     91400   19.0300 -114.0100      11.1       188       120        60
OIR    2025250     91400   19.0300 -114.0200      11.1       188       120        60
OIR    2025250     91400   19.0300 -114.0300      11.1       188       120        60
OIR    2025250     91400   19.0300 -114.0400      11.1       188       120        60
OIR    2025250     91400   19.0300 -114.0500      11.1       188       121        60
OIR    2025250     91400   19.0300 -114.0600      11.1       188       121        60
OIR    2025250     91400   19.0300 -114.0700      11.1       188       121        60
OIR    2025250     91400   19.0300 -114.0800      11.1       188       121        60
OIR    2025250     91400   19.0300 -114.0900      11.1       188       122        60
OIR    2025250     91400   19.0300 -114.1000      11.1       188       123        60
OIR    2025250     91400   19.0300 -114.1100      11.0       189       124        60
OIR    2025250     91400   19.0300 -114.1200      11.0       189       124        60
OIR    2025250     91400   19.0300 -114.1300      11.0       189       125        60
OIR    2025250     91400   19.0300 -114.1400      11.0       189       125        60
OIR    2025250     91400   19.0300 -114.1500      11.0       190       126        60
OIR    2025250     91400   19.0300 -114.1600      11.0       190       128        60
OIR    2025250     91400   19.0300 -114.1700      11.1       190       130        60
OIR    2025250     91400   19.0300 -114.1800      11.1       190       133        60
OIR    2025250     91400   19.0300 -114.1900      11.1       190       136        60
OIR    2025250     91400   19.0300 -114.2000      11.1       190       139        60
OIR    2025250     91400   19.0300 -114.2100      11.2       190       139        60
OIR    2025250     91400   19.0300 -114.2200      11.2       189       140        60
OIR    2025250     91400   19.0300 -114.2300      11.3       189       141        60
OIR    2025250     91400   19.0200 -110.4400      16.8        95       140        60
OIR    2025250     91400   19.0200 -110.4500      17.5        95       142        60
OIR    2025250     91400   19.0200 -110.7500      19.1        97       140        60
OIR    2025250     91400   19.0200 -110.7600      19.1        96       142        60
OIR    2025250     91400   19.0200 -111.3900      17.0        96       138        60
OIR    2025250     91400   19.0200 -111.4000      17.6        99       132        60
OIR    2025250     91400   19.0200 -111.4100      17.4        99       127        60
OIR    2025250     91400   19.0200 -111.4200      17.4       100       121        60
OIR    2025250     91400   19.0200 -111.4300      17.3       100       113        60
OIR    2025250     91400   19.0200 -111.4400      17.1       100       105        60
OIR    2025250     91400   19.0200 -111.4500      16.6       100       104        60
OIR    2025250     91400   19.0200 -111.4600      16.1       101       104        60
OIR    2025250     91400   19.0200 -111.4700      15.6       104       103        60
OIR    2025250     91400   19.0200 -111.4800      15.2       107       103        60
OIR    2025250     91400   19.0200 -111.4900      14.7       107       103        60
OIR    2025250     91400   19.0200 -111.5000      14.3       107       103        60
OIR    2025250     91400   19.0200 -111.5100      14.0       107       103        60
OIR    2025250     91400   19.0200 -111.5200      13.7       107       103        60
OIR    2025250     91400   19.0200 -111.5300      13.5       107       103        60
OIR    2025250     91400   19.0200 -111.5400      13.2       107       103        60
OIR    2025250     91400   19.0200 -111.5500      13.0       106       103        60
OIR    2025250     91400   19.0200 -111.5600      12.8       106       103        60
OIR    2025250     91400   19.0200 -111.5700      12.6       106       104        60
OIR    2025250     91400   19.0200 -111.5800      12.5       105       104        60
OIR    2025250     91400   19.0200 -111.5900      12.1       103       104        60
OIR    2025250     91400   19.0200 -111.6000      11.5        98       105        60
OIR    2025250     91400   19.0200 -111.6100      10.7        89       107        60
OIR    2025250     91400   19.0200 -111.6200      10.4        86       107        60
OIR    2025250     91400   19.0200 -111.6300      10.2        86       107        60
OIR    2025250     91400   19.0200 -111.6400      10.1        85       110        60
OIR    2025250     91400   19.0200 -111.6500      10.2        84       113        60
OIR    2025250     91400   19.0200 -111.6600      10.3        84       121        60
OIR    2025250     91400   19.0200 -111.6700      10.3        84       130        60
OIR    2025250     91400   19.0200 -111.6800      10.4        84       138        60
OIR    2025250     91400   19.0200 -111.6900      11.7        82       141        60
OIR    2025250     91400   19.0200 -113.0100       7.0       152       141        60
OIR    2025250     91400   19.0200 -113.0200       7.0       153       142        60
OIR    2025250     91400   19.0200 -113.0400       7.0       157       141        60
OIR    2025250     91400   19.0200 -113.0500       7.1       160       139        60
OIR    2025250     91400   19.0200 -113.0600       7.2       164       138        60
OIR    2025250     91400   19.0200 -113.0700       7.3       166       139        60
OIR    2025250     91400   19.0200 -113.0800       7.4       167       139        60
OIR    2025250     91400   19.0200 -113.0900       7.5       169       138        60
OIR    2025250     91400   19.0200 -113.1000       7.5       170       137        60
OIR    2025250     91400   19.0200 -113.1100       7.6       171       137        60
OIR    2025250     91400   19.0200 -113.1200       7.7       172       136        60
OIR    2025250     91400   19.0200 -113.1300       7.8       174       135        60
OIR    2025250     91400   19.0200 -113.1400       7.8       174       133        60
OIR    2025250     91400   19.0200 -113.1500       7.9       174       131        60
OIR    2025250     91400   19.0200 -113.1600       7.9       175       131        60
OIR    2025250     91400   19.0200 -113.1700       7.9       175       131        60
OIR    2025250     91400   19.0200 -113.1800       7.9       175       128        60
OIR    2025250     91400   19.0200 -113.1900       7.9       175       125        60
OIR    2025250     91400   19.0200 -113.2000       7.9       175       123        60
OIR    2025250     91400   19.0200 -113.2100       7.9       175       123        60
OIR    2025250     91400   19.0200 -113.2200       7.9       175       122        60
OIR    2025250     91400   19.0200 -113.2300       7.9       175       122        60
OIR    2025250     91400   19.0200 -113.2400       7.9       175       121        60
OIR    2025250     91400   19.0200 -113.2500       7.9       175       121        60
OIR    2025250     91400   19.0200 -113.2600       7.9       175       121        60
OIR    2025250     91400   19.0200 -113.2700       7.9       175       120        60
OIR    2025250     91400   19.0200 -113.2800       7.9       175       117        60
OIR    2025250     91400   19.0200 -113.2900       7.9       175       116        60
OIR    2025250     91400   19.0200 -113.3000       8.0       175       116        60
OIR    2025250     91400   19.0200 -113.3100       8.0       175       114        60
OIR    2025250     91400   19.0200 -113.3200       8.0       175       112        60
OIR    2025250     91400   19.0200 -113.3300       8.1       175       111        60
OIR    2025250     91400   19.0200 -113.3400       8.1       175       111        60
OIR    2025250     91400   19.0200 -113.3500       8.2       175       111        60
OIR    2025250     91400   19.0200 -113.3600       8.2       175       111        60
OIR    2025250     91400   19.0200 -113.3700       8.3       175       110        60
OIR    2025250     91400   19.0200 -113.3800       8.3       175       109        60
OIR    2025250     91400   19.0200 -113.3900       8.4       175       109        60
OIR    2025250     91400   19.0200 -113.4000       8.5       175       109        60
OIR    2025250     91400   19.0200 -113.4100       8.6       175       108        60
OIR    2025250     91400   19.0200 -113.4200       8.6       175       108        60
OIR    2025250     91400   19.0200 -113.4300       8.6       175       109        60
OIR    2025250     91400   19.0200 -113.4400       8.7       175       109        60
OIR    2025250     91400   19.0200 -113.4500       8.7       175       110        60
OIR    2025250     91400   19.0200 -113.4600       8.8       175       109        60
OIR    2025250     91400   19.0200 -113.4700       8.8       175       109        60
OIR    2025250     91400   19.0200 -113.4800       8.9       175       109        60
OIR    2025250     91400   19.0200 -113.4900       9.0       175       108        60
OIR    2025250     91400   19.0200 -113.5000       9.0       175       108        60
OIR    2025250     91400   19.0200 -113.5100       9.1       175       107        60
OIR    2025250     91400   19.0200 -113.5200       9.2       175       107        60
OIR    2025250     91400   19.0200 -113.5300       9.2       175       107        60
OIR    2025250     91400   19.0200 -113.5400       9.3       175       108        60
OIR    2025250     91400   19.0200 -113.5500       9.3       175       109        60
OIR    2025250     91400   19.0200 -113.5600       9.4       175       110        60
OIR    2025250     91400   19.0200 -113.5700       9.4       175       111        60
OIR    2025250     91400   19.0200 -113.5800       9.4       176       111        60
OIR    2025250     91400   19.0200 -113.5900       9.4       176       111        60
OIR    2025250     91400   19.0200 -113.6000       9.5       176       112        60
OIR    2025250     91400   19.0200 -113.6100       9.5       176       113        60
OIR    2025250     91400   19.0200 -113.6200       9.5       176       113        60
OIR    2025250     91400   19.0200 -113.6300       9.5       176       113        60
OIR    2025250     91400   19.0200 -113.6400       9.5       176       112        60
OIR    2025250     91400   19.0200 -113.6500       9.5       177       112        60
OIR    2025250     91400   19.0200 -113.6600       9.5       177       112        60
OIR    2025250     91400   19.0200 -113.6700       9.6       177       113        60
OIR    2025250     91400   19.0200 -113.6800       9.7       178       114        60
OIR    2025250     91400   19.0200 -113.6900       9.9       181       115        60
OIR    2025250     91400   19.0200 -113.7000      10.1       182       116        60
OIR    2025250     91400   19.0200 -113.7100      10.2       183       116        60
OIR    2025250     91400   19.0200 -113.7200      10.2       183       117        60
OIR    2025250     91400   19.0200 -113.7300      10.3       183       116        60
OIR    2025250     91400   19.0200 -113.7400      10.3       183       114        60
OIR    2025250     91400   19.0200 -113.7500      10.3       184       114        60
OIR    2025250     91400   19.0200 -113.7600      10.4       184       115        60
OIR    2025250     91400   19.0200 -113.7700      10.4       184       116        60
OIR    2025250     91400   19.0200 -113.7800      10.5       185       117        60
OIR    2025250     91400   19.0200 -113.7900      10.5       185       120        60
OIR    2025250     91400   19.0200 -113.8000      10.6       185       121        60
OIR    2025250     91400   19.0200 -113.8100      10.6       185       121        60
OIR    2025250     91400   19.0200 -113.8200      10.7       186       120        60
OIR    2025250     91400   19.0200 -113.8300      10.8       186       119        60
OIR    2025250     91400   19.0200 -113.8400      10.9       187       117        60
OIR    2025250     91400   19.0200 -113.8500      11.0       187       117        60
OIR    2025250     91400   19.0200 -113.8600      11.0       187       119        60
OIR    2025250     91400   19.0200 -113.8700      11.1       187       119        60
OIR    2025250     91400   19.0200 -113.8800      11.1       187       119        60
OIR    2025250     91400   19.0200 -113.8900      11.1       187       119        60
OIR    2025250     91400   19.0200 -113.9000      11.1       188       120        60
OIR    2025250     91400   19.0200 -113.9100      11.1       188       120        60
OIR    2025250     91400   19.0200 -113.9200      11.1       188       120        60
OIR    2025250     91400   19.0200 -113.9300      11.1       188       120        60
OIR    2025250     91400   19.0200 -113.9400      11.1       188       120        60
OIR    2025250     91400   19.0200 -113.9500      11.1       188       120        60
OIR    2025250     91400   19.0200 -113.9600      11.1       188       117        60
OIR    2025250     91400   19.0200 -113.9700      11.1       188       116        60
OIR    2025250     91400   19.0200 -113.9800      11.1       188       117        60
OIR    2025250     91400   19.0200 -113.9900      11.1       188       120        60
OIR    2025250     91400   19.0200 -114.0000      11.1       188       121        60
OIR    2025250     91400   19.0200 -114.0100      11.1       188       120        60
OIR    2025250     91400   19.0200 -114.0200      11.1       188       120        60
OIR    2025250     91400   19.0200 -114.0300      11.1       188       121        60
OIR    2025250     91400   19.0200 -114.0400      11.1       189       121        60
OIR    2025250     91400   19.0200 -114.0500      11.1       189       122        60
OIR    2025250     91400   19.0200 -114.0600      11.1       189       124        60
OIR    2025250     91400   19.0200 -114.0700      11.1       189       123        60
OIR    2025250     91400   19.0200 -114.0800      11.1       189       122        60
OIR    2025250     91400   19.0200 -114.0900      11.1       189       121        60
OIR    2025250     91400   19.0200 -114.1000      11.1       189       122        60
OIR    2025250     91400   19.0200 -114.1100      11.1       189       123        60
OIR    2025250     91400   19.0200 -114.1200      11.1       189       124        60
OIR    2025250     91400   19.0200 -114.1300      11.1       190       125        60
OIR    2025250     91400   19.0200 -114.1400      11.1       190       125        60
OIR    2025250     91400   19.0200 -114.1500      11.1       190       126        60
OIR    2025250     91400   19.0200 -114.1600      11.1       190       128        60
OIR    2025250     91400   19.0200 -114.1700      11.1       190       133        60
OIR    2025250     91400   19.0200 -114.1800      11.1       190       137        60
OIR    2025250     91400   19.0200 -114.1900      11.2       190       141        60
OIR    2025250     91400   19.0100 -110.3900      19.1        99       143        60
OIR    2025250     91400   19.0100 -110.4000      18.2        98       141        60
OIR    2025250     91400   19.0100 -110.4100      17.5        95       139        60
OIR    2025250     91400   19.0100 -110.4200      16.9        95       138        60
OIR    2025250     91400   19.0100 -110.4300      17.0        95       137        60
OIR    2025250     91400   19.0100 -110.4400      17.0        95       136        60
OIR    2025250     91400   19.0100 -110.4500      17.5        94       139        60
OIR    2025250     91400   19.0100 -111.3900      18.1        97       140        60
OIR    2025250     91400   19.0100 -111.4000      18.1        98       136        60
OIR    2025250     91400   19.0100 -111.4100      17.8        98       127        60
OIR    2025250     91400   19.0100 -111.4200      17.7        98       117        60
OIR    2025250     91400   19.0100 -111.4300      17.3        98       112        60
OIR    2025250     91400   19.0100 -111.4400      16.1        96       104        60
OIR    2025250     91400   19.0100 -111.4500      15.5        96       104        60
OIR    2025250     91400   19.0100 -111.4600      15.2        98       103        60
OIR    2025250     91400   19.0100 -111.4700      14.9       101       103        60
OIR    2025250     91400   19.0100 -111.4800      14.6       104       103        60
OIR    2025250     91400   19.0100 -111.4900      14.2       105       103        60
OIR    2025250     91400   19.0100 -111.5000      13.9       106       103        60
OIR    2025250     91400   19.0100 -111.5100      13.8       106       104        60
OIR    2025250     91400   19.0100 -111.5200      13.6       106       104        60
OIR    2025250     91400   19.0100 -111.5300      13.5       106       104        60
OIR    2025250     91400   19.0100 -111.5400      13.3       106       104        60
OIR    2025250     91400   19.0100 -111.5500      13.1       106       104        60
OIR    2025250     91400   19.0100 -111.5600      12.9       106       104        60
OIR    2025250     91400   19.0100 -111.5700      12.8       105       104        60
OIR    2025250     91400   19.0100 -111.5800      12.6       104       104        60
OIR    2025250     91400   19.0100 -111.5900      12.4       103       104        60
OIR    2025250     91400   19.0100 -111.6000      11.9        99       104        60
OIR    2025250     91400   19.0100 -111.6100      11.2        92       104        60
OIR    2025250     91400   19.0100 -111.6200      10.7        88       104        60
OIR    2025250     91400   19.0100 -111.6300      10.3        86       104        60
OIR    2025250     91400   19.0100 -111.6400      10.2        85       108        60
OIR    2025250     91400   19.0100 -111.6500      10.3        85       111        60
OIR    2025250     91400   19.0100 -111.6600      10.5        85       117        60
OIR    2025250     91400   19.0100 -111.6700      10.5        85       127        60
OIR    2025250     91400   19.0100 -111.6800      10.6        84       137        60
OIR    2025250     91400   19.0100 -111.6900      11.9        82       141        60
OIR    2025250     91400   19.0100 -113.0100       7.0       151       140        60
OIR    2025250     91400   19.0100 -113.0200       7.0       151       141        60
OIR    2025250     91400   19.0100 -113.0300       7.0       151       142        60
OIR    2025250     91400   19.0100 -113.0400       7.0       153       140        60
OIR    2025250     91400   19.0100 -113.0500       7.0       156       138        60
OIR    2025250     91400   19.0100 -113.0600       7.0       158       136        60
OIR    2025250     91400   19.0100 -113.0700       7.1       161       137        60
OIR    2025250     91400   19.0100 -113.0800       7.2       163       139        60
OIR    2025250     91400   19.0100 -113.0900       7.2       164       138        60
OIR    2025250     91400   19.0100 -113.1000       7.2       165       137        60
OIR    2025250     91400   19.0100 -113.1100       7.3       167       136        60
OIR    2025250     91400   19.0100 -113.1200       7.4       169       136        60
OIR    2025250     91400   19.0100 -113.1300       7.6       171       136        60
OIR    2025250     91400   19.0100 -113.1400       7.7       173       135        60
OIR    2025250     91400   19.0100 -113.1500       7.8       174       134        60
OIR    2025250     91400   19.0100 -113.1600       7.8       174       134        60
OIR    2025250     91400   19.0100 -113.1700       7.9       175       135        60
OIR    2025250     91400   19.0100 -113.1800       7.9       175       131        60
OIR    2025250     91400   19.0100 -113.1900       7.9       175       126        60
OIR    2025250     91400   19.0100 -113.2000       7.9       175       124        60
OIR    2025250     91400   19.0100 -113.2100       7.9       175       123        60
OIR    2025250     91400   19.0100 -113.2200       7.9       175       123        60
OIR    2025250     91400   19.0100 -113.2300       7.9       175       122        60
OIR    2025250     91400   19.0100 -113.2400       7.9       175       120        60
OIR    2025250     91400   19.0100 -113.2500       7.9       175       119        60
OIR    2025250     91400   19.0100 -113.2600       7.9       175       119        60
OIR    2025250     91400   19.0100 -113.2700       7.9       175       117        60
OIR    2025250     91400   19.0100 -113.2800       7.9       175       119        60
OIR    2025250     91400   19.0100 -113.2900       7.9       175       120        60
OIR    2025250     91400   19.0100 -113.3000       7.9       175       117        60
OIR    2025250     91400   19.0100 -113.3100       8.0       175       116        60
OIR    2025250     91400   19.0100 -113.3200       8.0       175       115        60
OIR    2025250     91400   19.0100 -113.3300       8.1       175       112        60
OIR    2025250     91400   19.0100 -113.3400       8.1       175       111        60
OIR    2025250     91400   19.0100 -113.3500       8.2       175       111        60
OIR    2025250     91400   19.0100 -113.3600       8.2       175       111        60
OIR    2025250     91400   19.0100 -113.3700       8.3       175       111        60
OIR    2025250     91400   19.0100 -113.3800       8.4       175       111        60
OIR    2025250     91400   19.0100 -113.3900       8.4       175       110        60
OIR    2025250     91400   19.0100 -113.4000       8.5       175       109        60
OIR    2025250     91400   19.0100 -113.4100       8.6       175       108        60
OIR    2025250     91400   19.0100 -113.4200       8.6       175       109        60
OIR    2025250     91400   19.0100 -113.4300       8.7       175       109        60
OIR    2025250     91400   19.0100 -113.4400       8.7       175       110        60
OIR    2025250     91400   19.0100 -113.4500       8.8       175       110        60
OIR    2025250     91400   19.0100 -113.4600       8.8       175       110        60
OIR    2025250     91400   19.0100 -113.4700       8.9       175       110        60
OIR    2025250     91400   19.0100 -113.4800       9.0       175       109        60
OIR    2025250     91400   19.0100 -113.4900       9.0       175       109        60
OIR    2025250     91400   19.0100 -113.5000       9.1       175       108        60
OIR    2025250     91400   19.0100 -113.5100       9.2       175       108        60
OIR    2025250     91400   19.0100 -113.5200       9.3       175       108        60
OIR    2025250     91400   19.0100 -113.5300       9.3       175       108        60
OIR    2025250     91400   19.0100 -113.5400       9.4       175       109        60
OIR    2025250     91400   19.0100 -113.5500       9.4       175       109        60
OIR    2025250     91400   19.0100 -113.5600       9.4       175       110        60
OIR    2025250     91400   19.0100 -113.5700       9.5       175       110        60
OIR    2025250     91400   19.0100 -113.5800       9.5       175       110        60
OIR    2025250     91400   19.0100 -113.5900       9.5       175       111        60
OIR    2025250     91400   19.0100 -113.6000       9.5       176       112        60
OIR    2025250     91400   19.0100 -113.6100       9.5       176       113        60
OIR    2025250     91400   19.0100 -113.6200       9.5       176       113        60
OIR    2025250     91400   19.0100 -113.6300       9.5       176       114        60
OIR    2025250     91400   19.0100 -113.6400       9.5       176       113        60
OIR    2025250     91400   19.0100 -113.6500       9.6       176       112        60
OIR    2025250     91400   19.0100 -113.6600       9.6       177       112        60
OIR    2025250     91400   19.0100 -113.6700       9.6       177       114        60
OIR    2025250     91400   19.0100 -113.6800       9.7       178       115        60
OIR    2025250     91400   19.0100 -113.6900      10.0       181       116        60
OIR    2025250     91400   19.0100 -113.7000      10.2       182       116        60
OIR    2025250     91400   19.0100 -113.7100      10.2       183       116        60
OIR    2025250     91400   19.0100 -113.7200      10.3       183       117        60
OIR    2025250     91400   19.0100 -113.7300      10.3       183       116        60
OIR    2025250     91400   19.0100 -113.7400      10.3       184       115        60
OIR    2025250     91400   19.0100 -113.7500      10.4       184       114        60
OIR    2025250     91400   19.0100 -113.7600      10.4       184       115        60
OIR    2025250     91400   19.0100 -113.7700      10.4       184       116        60
OIR    2025250     91400   19.0100 -113.7800      10.5       185       119        60
OIR    2025250     91400   19.0100 -113.7900      10.5       185       121        60
OIR    2025250     91400   19.0100 -113.8000      10.6       185       122        60
OIR    2025250     91400   19.0100 -113.8100      10.7       186       122        60
OIR    2025250     91400   19.0100 -113.8200      10.8       187       122        60
OIR    2025250     91400   19.0100 -113.8300      10.9       187       121        60
OIR    2025250     91400   19.0100 -113.8400      11.0       187       120        60
OIR    2025250     91400   19.0100 -113.8500      11.0       187       119        60
OIR    2025250     91400   19.0100 -113.8600      11.1       187       116        60
OIR    2025250     91400   19.0100 -113.8700      11.1       187       119        60
OIR    2025250     91400   19.0100 -113.8800      11.1       188       121        60
OIR    2025250     91400   19.0100 -113.8900      11.2       188       121        60
OIR    2025250     91400   19.0100 -113.9000      11.2       188       120        60
OIR    2025250     91400   19.0100 -113.9100      11.2       188       120        60
OIR    2025250     91400   19.0100 -113.9200      11.2       188       120        60
OIR    2025250     91400   19.0100 -113.9300      11.2       188       120        60
OIR    2025250     91400   19.0100 -113.9400      11.2       188       120        60
OIR    2025250     91400   19.0100 -113.9500      11.2       188       120        60
OIR    2025250     91400   19.0100 -113.9600      11.2       188       119        60
OIR    2025250     91400   19.0100 -113.9700      11.2       188       117        60
OIR    2025250     91400   19.0100 -113.9800      11.2       188       117        60
OIR    2025250     91400   19.0100 -113.9900      11.2       188       120        60
OIR    2025250     91400   19.0100 -114.0000      11.2       189       121        60
OIR    2025250     91400   19.0100 -114.0100      11.2       189       121        60
OIR    2025250     91400   19.0100 -114.0200      11.2       189       121        60
OIR    2025250     91400   19.0100 -114.0300      11.1       189       122        60
OIR    2025250     91400   19.0100 -114.0400      11.1       189       122        60
OIR    2025250     91400   19.0100 -114.0500      11.1       189       124        60
OIR    2025250     91400   19.0100 -114.0600      11.1       189       125        60
OIR    2025250     91400   19.0100 -114.0700      11.1       189       126        60
OIR    2025250     91400   19.0100 -114.0800      11.1       189       124        60
OIR    2025250     91400   19.0100 -114.0900      11.1       189       122        60
OIR    2025250     91400   19.0100 -114.1000      11.1       189       122        60
OIR    2025250     91400   19.0100 -114.1100      11.1       189       122        60
OIR    2025250     91400   19.0100 -114.1200      11.1       190       125        60
OIR    2025250     91400   19.0100 -114.1300      11.1       190       129        60
OIR    2025250     91400   19.0100 -114.1400      11.1       190       129        60
OIR    2025250     91400   19.0100 -114.1500      11.1       191       128        60
OIR    2025250     91400   19.0100 -114.1600      11.1       191       129        60
OIR    2025250     91400   19.0100 -114.1700      11.2       191       134        60
OIR    2025250     91400   19.0100 -114.1800      11.2       191       140        60
OIR    2025250     91400   19.0100 -114.2300      11.4       190       141        60
OIR    2025250     91400   19.0000 -110.4000      18.0        96       141        60
OIR    2025250     91400   19.0000 -110.4100      17.8        95       138        60
OIR    2025250     91400   19.0000 -110.4200      17.0        95       135        60
OIR    2025250     91400   19.0000 -110.4300      17.0        95       134        60
OIR    2025250     91400   19.0000 -110.4400      16.9        95       132        60
OIR    2025250     91400   19.0000 -110.4500      16.8        93       133        60
OIR    2025250     91400   19.0000 -110.4600      16.0        91       136        60
OIR    2025250     91400   19.0000 -110.4700      16.2        80       138        60
OIR    2025250     91400   19.0000 -110.4800      16.3        78       140        60
OIR    2025250     91400   19.0000 -110.4900      16.3        78       142        60
OIR    2025250     91400   19.0000 -111.4000      18.1        97       138        60
OIR    2025250     91400   19.0000 -111.4100      17.9        97       128        60
OIR    2025250     91400   19.0000 -111.4200      17.8        97       117        60
OIR    2025250     91400   19.0000 -111.4300      16.8        94       111        60
OIR    2025250     91400   19.0000 -111.4400      14.8        91       105        60
OIR    2025250     91400   19.0000 -111.4500      14.7        93       103        60
OIR    2025250     91400   19.0000 -111.4600      14.7        96       103        60
OIR    2025250     91400   19.0000 -111.4700      14.5       100       103        60
OIR    2025250     91400   19.0000 -111.4800      14.2       103       103        60
OIR    2025250     91400   19.0000 -111.4900      13.9       105       103        60
OIR    2025250     91400   19.0000 -111.5000      13.8       105       103        60
OIR    2025250     91400   19.0000 -111.5100      13.7       106       104        60
OIR    2025250     91400   19.0000 -111.5200      13.6       106       104        60
OIR    2025250     91400   19.0000 -111.5300      13.5       106       104        60
OIR    2025250     91400   19.0000 -111.5400      13.4       106       104        60
OIR    2025250     91400   19.0000 -111.5500      13.2       105       105        60
OIR    2025250     91400   19.0000 -111.5600      13.0       105       107        60
OIR    2025250     91400   19.0000 -111.5700      12.9       105       105        60
OIR    2025250     91400   19.0000 -111.5800      12.8       104       104        60
OIR    2025250     91400   19.0000 -111.5900      12.7       103       104        60
OIR    2025250     91400   19.0000 -111.6000      12.4       101       103        60
OIR    2025250     91400   19.0000 -111.6100      12.1        98       103        60
OIR    2025250     91400   19.0000 -111.6200      11.7        95       104        60
OIR    2025250     91400   19.0000 -111.6300      10.9        92       104        60
OIR    2025250     91400   19.0000 -111.6400      10.6        89       105        60
OIR    2025250     91400   19.0000 -111.6500      10.6        88       110        60
OIR    2025250     91400   19.0000 -111.6600      10.8        86       116        60
OIR    2025250     91400   19.0000 -111.6700      10.8        85       126        60
OIR    2025250     91400   19.0000 -111.6800      10.9        84       137        60
OIR    2025250     91400   19.0000 -113.0000       7.0       150       142        60
OIR    2025250     91400   19.0000 -113.0100       7.0       150       140        60
OIR    2025250     91400   19.0000 -113.0200       7.0       150       140        60
OIR    2025250     91400   19.0000 -113.0300       7.0       151       142        60
OIR    2025250     91400   19.0000 -113.0400       7.0       151       141        60
OIR    2025250     91400   19.0000 -113.0500       7.0       152       138        60
OIR    2025250     91400   19.0000 -113.0600       7.0       154       135        60
OIR    2025250     91400   19.0000 -113.0700       7.0       155       135        60
OIR    2025250     91400   19.0000 -113.0800       7.0       156       135        60
OIR    2025250     91400   19.0000 -113.0900       7.0       157       136        60
OIR    2025250     91400   19.0000 -113.1000       7.0       158       137        60
OIR    2025250     91400   19.0000 -113.1100       7.1       160       138        60
OIR    2025250     91400   19.0000 -113.1200       7.1       164       137        60
OIR    2025250     91400   19.0000 -113.1300       7.3       167       136        60
OIR    2025250     91400   19.0000 -113.1400       7.5       171       135        60
OIR    2025250     91400   19.0000 -113.1500       7.7       173       133        60
OIR    2025250     91400   19.0000 -113.1600       7.8       174       132        60
OIR    2025250     91400   19.0000 -113.1700       7.8       174       131        60
OIR    2025250     91400   19.0000 -113.1800       7.9       174       129        60
OIR    2025250     91400   19.0000 -113.1900       7.9       175       127        60
OIR    2025250     91400   19.0000 -113.2000       7.9       175       125        60
OIR    2025250     91400   19.0000 -113.2100       7.9       175       126        60
OIR    2025250     91400   19.0000 -113.2200       7.9       175       127        60
OIR    2025250     91400   19.0000 -113.2300       7.9       175       125        60
OIR    2025250     91400   19.0000 -113.2400       7.9       175       123        60
OIR    2025250     91400   19.0000 -113.2500       7.9       175       122        60
OIR    2025250     91400   19.0000 -113.2600       7.9       175       120        60
OIR    2025250     91400   19.0000 -113.2700       7.9       175       119        60
OIR    2025250     91400   19.0000 -113.2800       7.9       175       119        60
OIR    2025250     91400   19.0000 -113.2900       7.9       175       119        60
OIR    2025250     91400   19.0000 -113.3000       7.9       175       117        60
OIR    2025250     91400   19.0000 -113.3100       8.0       175       117        60
OIR    2025250     91400   19.0000 -113.3200       8.0       175       116        60
OIR    2025250     91400   19.0000 -113.3300       8.1       175       113        60
OIR    2025250     91400   19.0000 -113.3400       8.1       175       112        60
OIR    2025250     91400   19.0000 -113.3500       8.2       175       111        60
OIR    2025250     91400   19.0000 -113.3600       8.2       175       111        60
OIR    2025250     91400   19.0000 -113.3700       8.3       175       112        60
OIR    2025250     91400   19.0000 -113.3800       8.4       175       113        60
OIR    2025250     91400   19.0000 -113.3900       8.4       175       111        60
OIR    2025250     91400   19.0000 -113.4000       8.5       175       109        60
OIR    2025250     91400   19.0000 -113.4100       8.6       175       109        60
OIR    2025250     91400   19.0000 -113.4200       8.7       175       109        60
OIR    2025250     91400   19.0000 -113.4300       8.7       175       110        60
OIR    2025250     91400   19.0000 -113.4400       8.8       175       110        60
OIR    2025250     91400   19.0000 -113.4500       8.8       175       110        60
OIR    2025250     91400   19.0000 -113.4600       8.9       175       110        60
OIR    2025250     91400   19.0000 -113.4700       8.9       175       110        60
OIR    2025250     91400   19.0000 -113.4800       9.0       175       110        60
OIR    2025250     91400   19.0000 -113.4900       9.1       175       109        60
OIR    2025250     91400   19.0000 -113.5000       9.1       175       109        60
OIR    2025250     91400   19.0000 -113.5100       9.2       175       109        60
OIR    2025250     91400   19.0000 -113.5200       9.3       175       109        60
OIR    2025250     91400   19.0000 -113.5300       9.4       175       110        60
OIR    2025250     91400   19.0000 -113.5400       9.4       175       110        60
OIR    2025250     91400   19.0000 -113.5500       9.5       175       110        60
OIR    2025250     91400   19.0000 -113.5600       9.5       175       110        60
OIR    2025250     91400   19.0000 -113.5700       9.5       175       110        60
OIR    2025250     91400   19.0000 -113.5800       9.5       175       110        60
OIR    2025250     91400   19.0000 -113.5900       9.5       175       110        60
OIR    2025250     91400   19.0000 -113.6000       9.5       176       111        60
OIR    2025250     91400   19.0000 -113.6100       9.5       176       112        60
OIR    2025250     91400   19.0000 -113.6200       9.6       176       113        60
OIR    2025250     91400   19.0000 -113.6300       9.6       176       114        60
OIR    2025250     91400   19.0000 -113.6400       9.6       176       114        60
OIR    2025250     91400   19.0000 -113.6500       9.6       176       112        60
OIR    2025250     91400   19.0000 -113.6600       9.6       177       112        60
OIR    2025250     91400   19.0000 -113.6700       9.7       177       114        60
OIR    2025250     91400   19.0000 -113.6800       9.8       178       116        60
OIR    2025250     91400   19.0000 -113.6900      10.0       180       116        60
OIR    2025250     91400   19.0000 -113.7000      10.2       182       116        60
OIR    2025250     91400   19.0000 -113.7100      10.3       183       116        60
OIR    2025250     91400   19.0000 -113.7200      10.3       183       117        60
OIR    2025250     91400   19.0000 -113.7300      10.3       183       117        60
OIR    2025250     91400   19.0000 -113.7400      10.4       184       116        60
OIR    2025250     91400   19.0000 -113.7500      10.4       184       116        60
OIR    2025250     91400   19.0000 -113.7600      10.4       184       116        60
OIR    2025250     91400   19.0000 -113.7700      10.5       184       117        60
OIR    2025250     91400   19.0000 -113.7800      10.5       185       120        60
OIR    2025250     91400   19.0000 -113.7900      10.5       185       123        60
OIR    2025250     91400   19.0000 -113.8000      10.6       186       123        60
OIR    2025250     91400   19.0000 -113.8100      10.7       186       121        60
OIR    2025250     91400   19.0000 -113.8200      10.9       187       120        60
OIR    2025250     91400   19.0000 -113.8300      11.0       187       120        60
OIR    2025250     91400   19.0000 -113.8400      11.0       187       121        60
OIR    2025250     91400   19.0000 -113.8500      11.1       187       120        60
OIR    2025250     91400   19.0000 -113.8600      11.1       188       119        60
OIR    2025250     91400   19.0000 -113.8700      11.2       188       120        60
OIR    2025250     91400   19.0000 -113.8800      11.2       188       121        60
OIR    2025250     91400   19.0000 -113.8900      11.2       188       121        60
OIR    2025250     91400   19.0000 -113.9000      11.2       188       119        60
OIR    2025250     91400   19.0000 -113.9100      11.2       188       119        60
OIR    2025250     91400   19.0000 -113.9200      11.2       188       119        60
OIR    2025250     91400   19.0000 -113.9300      11.2       188       120        60
OIR    2025250     91400   19.0000 -113.9400      11.2       188       120        60
OIR    2025250     91400   19.0000 -113.9500      11.2       188       120        60
OIR    2025250     91400   19.0000 -113.9600      11.2       188       119        60
OIR    2025250     91400   19.0000 -113.9700      11.2       188       117        60
OIR    2025250     91400   19.0000 -113.9800      11.2       189       117        60
OIR    2025250     91400   19.0000 -113.9900      11.2       189       120        60
OIR    2025250     91400   19.0000 -114.0000      11.2       189       122        60
OIR    2025250     91400   19.0000 -114.0100      11.2       189       122        60
OIR    2025250     91400   19.0000 -114.0200      11.2       189       122        60
OIR    2025250     91400   19.0000 -114.0300      11.2       189       123        60
OIR    2025250     91400   19.0000 -114.0400      11.1       189       124        60
OIR    2025250     91400   19.0000 -114.0500      11.1       189       125        60
OIR    2025250     91400   19.0000 -114.0600      11.1       189       126        60
OIR    2025250     91400   19.0000 -114.0700      11.1       189       127        60
OIR    2025250     91400   19.0000 -114.0800      11.1       189       126        60
OIR    2025250     91400   19.0000 -114.0900      11.1       189       126        60
OIR    2025250     91400   19.0000 -114.1000      11.2       189       125        60
OIR    2025250     91400   19.0000 -114.1100      11.2       189       123        60
OIR    2025250     91400   19.0000 -114.1200      11.2       190       126        60
OIR    2025250     91400   19.0000 -114.1300      11.2       191       131        60
OIR    2025250     91400   19.0000 -114.1400      11.2       191       133        60
OIR    2025250     91400   19.0000 -114.1500      11.2       191       130        60
OIR    2025250     91400   19.0000 -114.1600      11.2       191       129        60
OIR    2025250     91400   19.0000 -114.1700      11.2       191       135        60
OIR    2025250     91400   19.0000 -114.2300      11.4       190       139        60
OIR    2025250     91400   18.9900 -110.4000      18.0        95       142        60
OIR    2025250     91400   18.9900 -110.4100      17.9        94       140        60
OIR    2025250     91400   18.9900 -110.4200      16.9        95       137        60
OIR    2025250     91400   18.9900 -110.4300      16.8        95       135        60
OIR    2025250     91400   18.9900 -110.4400      16.4        94       132        60
OIR    2025250     91400   18.9900 -110.4500      16.2        93       131        60
OIR    2025250     91400   18.9900 -110.4600      15.8        91       133        60
OIR    2025250     91400   18.9900 -110.4700      15.6        82       134        60
OIR    2025250     91400   18.9900 -110.4800      16.2        78       137        60
OIR    2025250     91400   18.9900 -110.4900      16.3        78       139        60
OIR    2025250     91400   18.9900 -110.5000      16.4        78       142        60
OIR    2025250     91400   18.9900 -111.4000      17.9        96       137        60
OIR    2025250     91400   18.9900 -111.4100      17.6        96       129        60
OIR    2025250     91400   18.9900 -111.4200      16.8        91       120        60
OIR    2025250     91400   18.9900 -111.4300      15.4        88       113        60
OIR    2025250     91400   18.9900 -111.4400      14.3        89       107        60
OIR    2025250     91400   18.9900 -111.4500      14.3        92       103        60
OIR    2025250     91400   18.9900 -111.4600      14.3        95       103        60
OIR    2025250     91400   18.9900 -111.4700      14.2       100       103        60
OIR    2025250     91400   18.9900 -111.4800      14.0       103       103        60
OIR    2025250     91400   18.9900 -111.4900      13.7       105       103        60
OIR    2025250     91400   18.9900 -111.5000      13.6       105       103        60
OIR    2025250     91400   18.9900 -111.5100      13.6       105       103        60
OIR    2025250     91400   18.9900 -111.5200      13.6       105       103        60
OIR    2025250     91400   18.9900 -111.5300      13.5       105       104        60
OIR    2025250     91400   18.9900 -111.5400      13.4       105       104        60
OIR    2025250     91400   18.9900 -111.5500      13.2       105       104        60
OIR    2025250     91400   18.9900 -111.5600      13.1       105       105        60
OIR    2025250     91400   18.9900 -111.5700      13.1       104       105        60
OIR    2025250     91400   18.9900 -111.5800      13.0       104       104        60
OIR    2025250     91400   18.9900 -111.5900      12.9       103       104        60
OIR    2025250     91400   18.9900 -111.6000      12.8       102       104        60
OIR    2025250     91400   18.9900 -111.6100      12.7       101       104        60
OIR    2025250     91400   18.9900 -111.6200      12.5        99       104        60
OIR    2025250     91400   18.9900 -111.6300      12.0        97       104        60
OIR    2025250     91400   18.9900 -111.6400      11.2        92       107        60
OIR    2025250     91400   18.9900 -111.6500      11.2        89       110        60
OIR    2025250     91400   18.9900 -111.6600      11.3        88       114        60
OIR    2025250     91400   18.9900 -111.6700      11.2        85       125        60
OIR    2025250     91400   18.9900 -111.6800      11.3        83       137        60
OIR    2025250     91400   18.9900 -111.7800      13.0        80       141        60
OIR    2025250     91400   18.9900 -113.0000       7.0       150       141        60
OIR    2025250     91400   18.9900 -113.0100       7.0       150       141        60
OIR    2025250     91400   18.9900 -113.0200       7.0       150       140        60
OIR    2025250     91400   18.9900 -113.0300       7.0       150       140        60
OIR    2025250     91400   18.9900 -113.0400       7.0       150       140        60
OIR    2025250     91400   18.9900 -113.0500       7.0       151       138        60
OIR    2025250     91400   18.9900 -113.0600       7.0       151       136        60
OIR    2025250     91400   18.9900 -113.0700       7.0       152       135        60
OIR    2025250     91400   18.9900 -113.0800       7.0       153       133        60
OIR    2025250     91400   18.9900 -113.0900       7.0       153       134        60
OIR    2025250     91400   18.9900 -113.1000       7.0       154       137        60
OIR    2025250     91400   18.9900 -113.1100       7.0       155       140        60
OIR    2025250     91400   18.9900 -113.1200       7.0       157       138        60
OIR    2025250     91400   18.9900 -113.1300       7.1       161       136        60
OIR    2025250     91400   18.9900 -113.1400       7.3       166       135        60
OIR    2025250     91400   18.9900 -113.1500       7.6       170       133        60
OIR    2025250     91400   18.9900 -113.1600       7.7       172       131        60
OIR    2025250     91400   18.9900 -113.1700       7.8       173       129        60
OIR    2025250     91400   18.9900 -113.1800       7.8       174       127        60
OIR    2025250     91400   18.9900 -113.1900       7.8       174       126        60
OIR    2025250     91400   18.9900 -113.2000       7.8       174       125        60
OIR    2025250     91400   18.9900 -113.2100       7.8       175       128        60
OIR    2025250     91400   18.9900 -113.2200       7.8       175       130        60
OIR    2025250     91400   18.9900 -113.2300       7.8       175       129        60
OIR    2025250     91400   18.9900 -113.2400       7.8       175       127        60
OIR    2025250     91400   18.9900 -113.2500       7.8       175       125        60
OIR    2025250     91400   18.9900 -113.2600       7.9       175       123        60
OIR    2025250     91400   18.9900 -113.2700       7.9       175       122        60
OIR    2025250     91400   18.9900 -113.2800       7.9       175       120        60
OIR    2025250     91400   18.9900 -113.2900       7.9       175       117        60
OIR    2025250     91400   18.9900 -113.3000       7.9       175       116        60
OIR    2025250     91400   18.9900 -113.3100       8.0       175       116        60
OIR    2025250     91400   18.9900 -113.3200       8.0       175       116        60
OIR    2025250     91400   18.9900 -113.3300       8.0       175       115        60
OIR    2025250     91400   18.9900 -113.3400       8.1       175       113        60
OIR    2025250     91400   18.9900 -113.3500       8.2       175       112        60
OIR    2025250     91400   18.9900 -113.3600       8.2       175       111        60
OIR    2025250     91400   18.9900 -113.3700       8.3       175       112        60
OIR    2025250     91400   18.9900 -113.3800       8.4       175       113        60
OIR    2025250     91400   18.9900 -113.3900       8.5       175       112        60
OIR    2025250     91400   18.9900 -113.4000       8.5       175       111        60
OIR    2025250     91400   18.9900 -113.4100       8.6       175       109        60
OIR    2025250     91400   18.9900 -113.4200       8.7       175       109        60
OIR    2025250     91400   18.9900 -113.4300       8.7       175       110        60
OIR    2025250     91400   18.9900 -113.4400       8.8       175       110        60
OIR    2025250     91400   18.9900 -113.4500       8.9       175       111        60
OIR    2025250     91400   18.9900 -113.4600       8.9       175       112        60
OIR    2025250     91400   18.9900 -113.4700       9.0       175       112        60
OIR    2025250     91400   18.9900 -113.4800       9.1       175       112        60
OIR    2025250     91400   18.9900 -113.4900       9.2       175       111        60
OIR    2025250     91400   18.9900 -113.5000       9.2       175       110        60
OIR    2025250     91400   18.9900 -113.5100       9.3       175       109        60
OIR    2025250     91400   18.9900 -113.5200       9.4       175       109        60
OIR    2025250     91400   18.9900 -113.5300       9.4       175       110        60
OIR    2025250     91400   18.9900 -113.5400       9.5       175       111        60
OIR    2025250     91400   18.9900 -113.5500       9.5       175       111        60
OIR    2025250     91400   18.9900 -113.5600       9.5       175       111        60
OIR    2025250     91400   18.9900 -113.5700       9.5       175       111        60
OIR    2025250     91400   18.9900 -113.5800       9.5       175       111        60
OIR    2025250     91400   18.9900 -113.5900       9.6       175       111        60
OIR    2025250     91400   18.9900 -113.6000       9.6       175       111        60
OIR    2025250     91400   18.9900 -113.6100       9.6       176       112        60
OIR    2025250     91400   18.9900 -113.6200       9.6       176       113        60
OIR    2025250     91400   18.9900 -113.6300       9.6       176       114        60
OIR    2025250     91400   18.9900 -113.6400       9.6       176       114        60
OIR    2025250     91400   18.9900 -113.6500       9.7       176       113        60
OIR    2025250     91400   18.9900 -113.6600       9.7       177       112        60
OIR    2025250     91400   18.9900 -113.6700       9.7       177       114        60
OIR    2025250     91400   18.9900 -113.6800       9.8       178       116        60
OIR    2025250     91400   18.9900 -113.6900      10.0       180       116        60
OIR    2025250     91400   18.9900 -113.7000      10.2       182       117        60
OIR    2025250     91400   18.9900 -113.7100      10.3       182       117        60
OIR    2025250     91400   18.9900 -113.7200      10.3       183       117        60
OIR    2025250     91400   18.9900 -113.7300      10.4       183       117        60
OIR    2025250     91400   18.9900 -113.7400      10.4       184       116        60
OIR    2025250     91400   18.9900 -113.7500      10.4       184       116        60
OIR    2025250     91400   18.9900 -113.7600      10.5       184       117        60
OIR    2025250     91400   18.9900 -113.7700      10.5       185       120        60
OIR    2025250     91400   18.9900 -113.7800      10.5       185       121        60
OIR    2025250     91400   18.9900 -113.7900      10.6       185       123        60
OIR    2025250     91400   18.9900 -113.8000      10.7       186       123        60
OIR    2025250     91400   18.9900 -113.8100      10.8       187       121        60
OIR    2025250     91400   18.9900 -113.8200      10.9       187       119        60
OIR    2025250     91400   18.9900 -113.8300      11.0       187       120        60
OIR    2025250     91400   18.9900 -113.8400      11.1       188       121        60
OIR    2025250     91400   18.9900 -113.8500      11.1       188       121        60
OIR    2025250     91400   18.9900 -113.8600      11.2       188       121        60
OIR    2025250     91400   18.9900 -113.8700      11.2       188       121        60
OIR    2025250     91400   18.9900 -113.8800      11.2       188       121        60
OIR    2025250     91400   18.9900 -113.8900      11.2       188       121        60
OIR    2025250     91400   18.9900 -113.9000      11.2       188       119        60
OIR    2025250     91400   18.9900 -113.9100      11.2       188       116        60
OIR    2025250     91400   18.9900 -113.9200      11.2       188       119        60
OIR    2025250     91400   18.9900 -113.9300      11.2       188       120        60
OIR    2025250     91400   18.9900 -113.9400      11.2       188       120        60
OIR    2025250     91400   18.9900 -113.9500      11.2       188       120        60
OIR    2025250     91400   18.9900 -113.9600      11.2       188       120        60
OIR    2025250     91400   18.9900 -113.9700      11.2       189       119        60
OIR    2025250     91400   18.9900 -113.9800      11.2       189       117        60
OIR    2025250     91400   18.9900 -113.9900      11.2       189       119        60
OIR    2025250     91400   18.9900 -114.0000      11.2       189       122        60
OIR    2025250     91400   18.9900 -114.0100      11.2       189       122        60
OIR    2025250     91400   18.9900 -114.0200      11.2       189       123        60
OIR    2025250     91400   18.9900 -114.0300      11.2       189       124        60
OIR    2025250     91400   18.9900 -114.0400      11.2       189       125        60
OIR    2025250     91400   18.9900 -114.0500      11.1       189       126        60
OIR    2025250     91400   18.9900 -114.0600      11.1       189       126        60
OIR    2025250     91400   18.9900 -114.0700      11.1       189       125        60
OIR    2025250     91400   18.9900 -114.0800      11.1       189       128        60
OIR    2025250     91400   18.9900 -114.0900      11.2       189       132        60
OIR    2025250     91400   18.9900 -114.1000      11.2       189       131        60
OIR    2025250     91400   18.9900 -114.1100      11.2       190       126        60
OIR    2025250     91400   18.9900 -114.1200      11.2       191       125        60
OIR    2025250     91400   18.9900 -114.1300      11.2       191       130        60
OIR    2025250     91400   18.9900 -114.1400      11.2       191       134        60
OIR    2025250     91400   18.9900 -114.1500      11.2       191       132        60
OIR    2025250     91400   18.9900 -114.1600      11.2       191       130        60
OIR    2025250     91400   18.9900 -114.1700      11.3       191       137        60
OIR    2025250     91400   18.9800 -110.4000      17.9        94       143        60
OIR    2025250     91400   18.9800 -110.4100      17.8        94       142        60
OIR    2025250     91400   18.9800 -110.4200      16.6        95       141        60
OIR    2025250     91400   18.9800 -110.4300      16.4        95       139        60
OIR    2025250     91400   18.9800 -110.4400      16.0        93       135        60
OIR    2025250     91400   18.9800 -110.4500      15.9        92       132        60
OIR    2025250     91400   18.9800 -110.4600      16.0        85       133        60
OIR    2025250     91400   18.9800 -110.4700      15.6        80       135        60
OIR    2025250     91400   18.9800 -110.4800      15.8        78       136        60
OIR    2025250     91400   18.9800 -110.4900      16.1        78       138        60
OIR    2025250     91400   18.9800 -110.5000      16.5        79       142        60
OIR    2025250     91400   18.9800 -111.4000      17.3        95       139        60
OIR    2025250     91400   18.9800 -111.4100      15.7        88       131        60
OIR    2025250     91400   18.9800 -111.4200      14.4        84       123        60
OIR    2025250     91400   18.9800 -111.4300      14.2        84       116        60
OIR    2025250     91400   18.9800 -111.4400      14.2        86       110        60
OIR    2025250     91400   18.9800 -111.4500      13.6        93       104        60
OIR    2025250     91400   18.9800 -111.4600      13.7        97       104        60
OIR    2025250     91400   18.9800 -111.4700      13.8       102       103        60
OIR    2025250     91400   18.9800 -111.4800      13.7       104       103        60
OIR    2025250     91400   18.9800 -111.4900      13.6       105       103        60
OIR    2025250     91400   18.9800 -111.5000      13.6       105       103        60
OIR    2025250     91400   18.9800 -111.5100      13.6       105       103        60
OIR    2025250     91400   18.9800 -111.5200      13.5       105       103        60
OIR    2025250     91400   18.9800 -111.5300      13.5       105       103        60
OIR    2025250     91400   18.9800 -111.5400      13.4       105       103        60
OIR    2025250     91400   18.9800 -111.5500      13.3       105       103        60
OIR    2025250     91400   18.9800 -111.5600      13.2       105       104        60
OIR    2025250     91400   18.9800 -111.5700      13.2       104       105        60
OIR    2025250     91400   18.9800 -111.5800      13.1       104       105        60
OIR    2025250     91400   18.9800 -111.5900      13.1       103       104        60
OIR    2025250     91400   18.9800 -111.6000      13.1       103       104        60
OIR    2025250     91400   18.9800 -111.6100      13.0       101       104        60
OIR    2025250     91400   18.9800 -111.6200      12.9       100       104        60
OIR    2025250     91400   18.9800 -111.6300      12.5        98       107        60
OIR    2025250     91400   18.9800 -111.6400      11.7        94       108        60
OIR    2025250     91400   18.9800 -111.6500      11.6        91       110        60
OIR    2025250     91400   18.9800 -111.6600      11.7        88       113        60
OIR    2025250     91400   18.9800 -111.6700      11.7        85       124        60
OIR    2025250     91400   18.9800 -111.6800      11.7        83       138        60
OIR    2025250     91400   18.9800 -112.9900       7.1       150       141        60
OIR    2025250     91400   18.9800 -113.0000       7.0       150       141        60
OIR    2025250     91400   18.9800 -113.0100       7.0       150       142        60
OIR    2025250     91400   18.9800 -113.0300       7.0       150       139        60
OIR    2025250     91400   18.9800 -113.0400       7.0       150       137        60
OIR    2025250     91400   18.9800 -113.0500       7.0       150       138        60
OIR    2025250     91400   18.9800 -113.0600       7.0       151       140        60
OIR    2025250     91400   18.9800 -113.0700       7.1       151       138        60
OIR    2025250     91400   18.9800 -113.0800       7.1       151       136        60
OIR    2025250     91400   18.9800 -113.0900       7.0       151       135        60
OIR    2025250     91400   18.9800 -113.1000       7.0       152       138        60
OIR    2025250     91400   18.9800 -113.1100       7.0       152       140        60
OIR    2025250     91400   18.9800 -113.1200       7.0       153       138        60
OIR    2025250     91400   18.9800 -113.1300       7.0       155       135        60
OIR    2025250     91400   18.9800 -113.1400       7.2       160       135        60
OIR    2025250     91400   18.9800 -113.1500       7.4       166       136        60
OIR    2025250     91400   18.9800 -113.1600       7.6       169       136        60
OIR    2025250     91400   18.9800 -113.1700       7.7       171       134        60
OIR    2025250     91400   18.9800 -113.1800       7.7       172       132        60
OIR    2025250     91400   18.9800 -113.1900       7.8       173       131        60
OIR    2025250     91400   18.9800 -113.2000       7.8       174       130        60
OIR    2025250     91400   18.9800 -113.2100       7.8       174       129        60
OIR    2025250     91400   18.9800 -113.2200       7.8       174       128        60
OIR    2025250     91400   18.9800 -113.2300       7.8       174       128        60
OIR    2025250     91400   18.9800 -113.2400       7.8       175       127        60
OIR    2025250     91400   18.9800 -113.2500       7.8       175       126        60
OIR    2025250     91400   18.9800 -113.2600       7.8       175       124        60
OIR    2025250     91400   18.9800 -113.2700       7.8       175       121        60
OIR    2025250     91400   18.9800 -113.2800       7.9       175       120        60
OIR    2025250     91400   18.9800 -113.2900       7.9       175       119        60
OIR    2025250     91400   18.9800 -113.3000       7.9       174       119        60
OIR    2025250     91400   18.9800 -113.3100       7.9       174       117        60
OIR    2025250     91400   18.9800 -113.3200       8.0       175       116        60
OIR    2025250     91400   18.9800 -113.3300       8.0       175       116        60
OIR    2025250     91400   18.9800 -113.3400       8.1       175       114        60
OIR    2025250     91400   18.9800 -113.3500       8.1       175       113        60
OIR    2025250     91400   18.9800 -113.3600       8.2       174       112        60
OIR    2025250     91400   18.9800 -113.3700       8.3       174       112        60
OIR    2025250     91400   18.9800 -113.3800       8.4       174       113        60
OIR    2025250     91400   18.9800 -113.3900       8.5       174       113        60
OIR    2025250     91400   18.9800 -113.4000       8.6       174       112        60
OIR    2025250     91400   18.9800 -113.4100       8.6       174       111        60
OIR    2025250     91400   18.9800 -113.4200       8.7       174       111        60
OIR    2025250     91400   18.9800 -113.4300       8.8       174       110        60
OIR    2025250     91400   18.9800 -113.4400       8.8       175       111        60
OIR    2025250     91400   18.9800 -113.4500       8.9       175       112        60
OIR    2025250     91400   18.9800 -113.4600       9.0       175       112        60
OIR    2025250     91400   18.9800 -113.4700       9.1       175       113        60
OIR    2025250     91400   18.9800 -113.4800       9.2       175       113        60
OIR    2025250     91400   18.9800 -113.4900       9.2       175       112        60
OIR    2025250     91400   18.9800 -113.5000       9.3       175       111        60
OIR    2025250     91400   18.9800 -113.5100       9.4       175       110        60
OIR    2025250     91400   18.9800 -113.5200       9.4       175       109        60
OIR    2025250     91400   18.9800 -113.5300       9.5       175       110        60
OIR    2025250     91400   18.9800 -113.5400       9.5       175       111        60
OIR    2025250     91400   18.9800 -113.5500       9.5       175       112        60
OIR    2025250     91400   18.9800 -113.5600       9.5       175       113        60
OIR    2025250     91400   18.9800 -113.5700       9.6       175       113        60
OIR    2025250     91400   18.9800 -113.5800       9.6       175       112        60
OIR    2025250     91400   18.9800 -113.5900       9.6       175       111        60
OIR    2025250     91400   18.9800 -113.6000       9.6       175       112        60
OIR    2025250     91400   18.9800 -113.6100       9.6       176       113        60
OIR    2025250     91400   18.9800 -113.6200       9.6       176       114        60
OIR    2025250     91400   18.9800 -113.6300       9.7       176       114        60
OIR    2025250     91400   18.9800 -113.6400       9.7       176       113        60
OIR    2025250     91400   18.9800 -113.6500       9.7       176       112        60
OIR    2025250     91400   18.9800 -113.6600       9.7       176       111        60
OIR    2025250     91400   18.9800 -113.6700       9.7       177       113        60
OIR    2025250     91400   18.9800 -113.6800       9.8       177       115        60
OIR    2025250     91400   18.9800 -113.6900      10.0       179       116        60
OIR    2025250     91400   18.9800 -113.7000      10.2       181       117        60
OIR    2025250     91400   18.9800 -113.7100      10.3       182       119        60
OIR    2025250     91400   18.9800 -113.7200      10.4       183       120        60
OIR    2025250     91400   18.9800 -113.7300      10.4       183       120        60
OIR    2025250     91400   18.9800 -113.7400      10.5       184       119        60
OIR    2025250     91400   18.9800 -113.7500      10.5       184       116        60
OIR    2025250     91400   18.9800 -113.7600      10.5       184       117        60
OIR    2025250     91400   18.9800 -113.7700      10.5       185       119        60
OIR    2025250     91400   18.9800 -113.7800      10.6       185       121        60
OIR    2025250     91400   18.9800 -113.7900      10.6       186       123        60
OIR    2025250     91400   18.9800 -113.8000      10.8       186       125        60
OIR    2025250     91400   18.9800 -113.8100      10.9       187       123        60
OIR    2025250     91400   18.9800 -113.8200      11.0       187       122        60
OIR    2025250     91400   18.9800 -113.8300      11.1       187       122        60
OIR    2025250     91400   18.9800 -113.8400      11.1       188       122        60
OIR    2025250     91400   18.9800 -113.8500      11.2       188       122        60
OIR    2025250     91400   18.9800 -113.8600      11.2       188       122        60
OIR    2025250     91400   18.9800 -113.8700      11.2       188       121        60
OIR    2025250     91400   18.9800 -113.8800      11.2       188       122        60
OIR    2025250     91400   18.9800 -113.8900      11.2       188       122        60
OIR    2025250     91400   18.9800 -113.9000      11.2       188       120        60
OIR    2025250     91400   18.9800 -113.9100      11.3       188       116        60
OIR    2025250     91400   18.9800 -113.9200      11.3       188       117        60
OIR    2025250     91400   18.9800 -113.9300      11.3       188       119        60
OIR    2025250     91400   18.9800 -113.9400      11.3       188       119        60
OIR    2025250     91400   18.9800 -113.9500      11.3       189       120        60
OIR    2025250     91400   18.9800 -113.9600      11.3       189       120        60
OIR    2025250     91400   18.9800 -113.9700      11.3       189       120        60
OIR    2025250     91400   18.9800 -113.9800      11.2       189       119        60
OIR    2025250     91400   18.9800 -113.9900      11.2       189       120        60
OIR    2025250     91400   18.9800 -114.0000      11.2       189       122        60
OIR    2025250     91400   18.9800 -114.0100      11.2       189       123        60
OIR    2025250     91400   18.9800 -114.0200      11.2       189       124        60
OIR    2025250     91400   18.9800 -114.0300      11.2       189       125        60
OIR    2025250     91400   18.9800 -114.0400      11.2       189       126        60
OIR    2025250     91400   18.9800 -114.0500      11.2       189       128        60
OIR    2025250     91400   18.9800 -114.0600      11.2       189       127        60
OIR    2025250     91400   18.9800 -114.0700      11.2       189       126        60
OIR    2025250     91400   18.9800 -114.0800      11.2       189       129        60
OIR    2025250     91400   18.9800 -114.0900      11.2       189       136        60
OIR    2025250     91400   18.9800 -114.1000      11.3       190       138        60
OIR    2025250     91400   18.9800 -114.1100      11.3       191       131        60
OIR    2025250     91400   18.9800 -114.1200      11.3       191       126        60
OIR    2025250     91400   18.9800 -114.1300      11.2       191       131        60
OIR    2025250     91400   18.9800 -114.1400      11.2       191       135        60
OIR    2025250     91400   18.9800 -114.1500      11.2       191       135        60
OIR    2025250     91400   18.9800 -114.1600      11.3       191       133        60
OIR    2025250     91400   18.9800 -114.1700      11.3       191       138        60
OIR    2025250     91400   18.9700 -110.4200      15.8        94       143        60
OIR    2025250     91400   18.9700 -110.4300      15.6        95       141        60
OIR    2025250     91400   18.9700 -110.4400      15.5        92       138        60
OIR    2025250     91400   18.9700 -110.4500      15.8        87       134        60
OIR    2025250     91400   18.9700 -110.4600      15.8        80       134        60
OIR    2025250     91400   18.9700 -110.4700      16.0        77       135        60
OIR    2025250     91400   18.9700 -110.4800      15.7        77       135        60
OIR    2025250     91400   18.9700 -110.4900      15.9        77       137        60
OIR    2025250     91400   18.9700 -110.5000      16.7        80       139        60
OIR    2025250     91400   18.9700 -111.4000      15.8        94       141        60
OIR    2025250     91400   18.9700 -111.4100      14.2        85       134        60
OIR    2025250     91400   18.9700 -111.4200      13.9        84       127        60
OIR    2025250     91400   18.9700 -111.4300      13.8        85       120        60
OIR    2025250     91400   18.9700 -111.4400      13.8        86       115        60
OIR    2025250     91400   18.9700 -111.4500      13.0        94       110        60
OIR    2025250     91400   18.9700 -111.4600      13.3       101       107        60
OIR    2025250     91400   18.9700 -111.4700      13.6       104       104        60
OIR    2025250     91400   18.9700 -111.4800      13.6       105       103        60
OIR    2025250     91400   18.9700 -111.4900      13.6       105       103        60
OIR    2025250     91400   18.9700 -111.5000      13.6       105       103        60
OIR    2025250     91400   18.9700 -111.5100      13.6       105       103        60
OIR    2025250     91400   18.9700 -111.5200      13.5       105       104        60
OIR    2025250     91400   18.9700 -111.5300      13.5       105       104        60
OIR    2025250     91400   18.9700 -111.5400      13.5       105       104        60
OIR    2025250     91400   18.9700 -111.5500      13.4       105       104        60
OIR    2025250     91400   18.9700 -111.5600      13.3       104       104        60
OIR    2025250     91400   18.9700 -111.5700      13.3       104       104        60
OIR    2025250     91400   18.9700 -111.5800      13.3       104       104        60
OIR    2025250     91400   18.9700 -111.5900      13.2       104       104        60
OIR    2025250     91400   18.9700 -111.6000      13.2       103       104        60
OIR    2025250     91400   18.9700 -111.6100      13.2       102       104        60
OIR    2025250     91400   18.9700 -111.6200      13.0       101       104        60
OIR    2025250     91400   18.9700 -111.6300      12.4        97       107        60
OIR    2025250     91400   18.9700 -111.6400      12.1        94       108        60
OIR    2025250     91400   18.9700 -111.6500      12.0        91       112        60
OIR    2025250     91400   18.9700 -111.6600      11.9        87       116        60
OIR    2025250     91400   18.9700 -111.6700      11.9        84       125        60
OIR    2025250     91400   18.9700 -111.6800      11.9        83       137        60
OIR    2025250     91400   18.9700 -112.9900       7.1       150       142        60
OIR    2025250     91400   18.9700 -113.0000       7.1       150       141        60
OIR    2025250     91400   18.9700 -113.0100       7.1       150       142        60
OIR    2025250     91400   18.9700 -113.0300       7.1       150       140        60
OIR    2025250     91400   18.9700 -113.0400       7.0       150       137        60
OIR    2025250     91400   18.9700 -113.0500       7.0       150       138        60
OIR    2025250     91400   18.9700 -113.0600       7.1       150       141        60
OIR    2025250     91400   18.9700 -113.0700       7.1       150       141        60
OIR    2025250     91400   18.9700 -113.0800       7.1       150       138        60
OIR    2025250     91400   18.9700 -113.0900       7.1       151       137        60
OIR    2025250     91400   18.9700 -113.1000       7.1       151       138        60
OIR    2025250     91400   18.9700 -113.1100       7.1       151       139        60
OIR    2025250     91400   18.9700 -113.1200       7.1       151       137        60
OIR    2025250     91400   18.9700 -113.1300       7.1       152       134        60
OIR    2025250     91400   18.9700 -113.1400       7.1       154       134        60
OIR    2025250     91400   18.9700 -113.1500       7.3       158       137        60
OIR    2025250     91400   18.9700 -113.1600       7.4       163       139        60
OIR    2025250     91400   18.9700 -113.1700       7.4       166       138        60
OIR    2025250     91400   18.9700 -113.1800       7.5       167       138        60
OIR    2025250     91400   18.9700 -113.1900       7.5       169       136        60
OIR    2025250     91400   18.9700 -113.2000       7.6       171       134        60
OIR    2025250     91400   18.9700 -113.2100       7.6       172       131        60
OIR    2025250     91400   18.9700 -113.2200       7.6       173       127        60
OIR    2025250     91400   18.9700 -113.2300       7.7       174       125        60
OIR    2025250     91400   18.9700 -113.2400       7.7       174       126        60
OIR    2025250     91400   18.9700 -113.2500       7.8       174       128        60
OIR    2025250     91400   18.9700 -113.2600       7.8       174       124        60
OIR    2025250     91400   18.9700 -113.2700       7.8       174       120        60
OIR    2025250     91400   18.9700 -113.2800       7.8       174       120        60
OIR    2025250     91400   18.9700 -113.2900       7.9       174       121        60
OIR    2025250     91400   18.9700 -113.3000       7.9       174       121        60
OIR    2025250     91400   18.9700 -113.3100       7.9       174       121        60
OIR    2025250     91400   18.9700 -113.3200       7.9       174       120        60
OIR    2025250     91400   18.9700 -113.3300       8.0       174       116        60
OIR    2025250     91400   18.9700 -113.3400       8.0       174       114        60
OIR    2025250     91400   18.9700 -113.3500       8.1       174       113        60
OIR    2025250     91400   18.9700 -113.3600       8.2       174       113        60
OIR    2025250     91400   18.9700 -113.3700       8.3       174       113        60
OIR    2025250     91400   18.9700 -113.3800       8.4       174       114        60
OIR    2025250     91400   18.9700 -113.3900       8.5       174       114        60
OIR    2025250     91400   18.9700 -113.4000       8.6       174       114        60
OIR    2025250     91400   18.9700 -113.4100       8.6       174       113        60
OIR    2025250     91400   18.9700 -113.4200       8.7       174       113        60
OIR    2025250     91400   18.9700 -113.4300       8.8       174       114        60
OIR    2025250     91400   18.9700 -113.4400       8.9       174       113        60
OIR    2025250     91400   18.9700 -113.4500       8.9       174       113        60
OIR    2025250     91400   18.9700 -113.4600       9.0       175       112        60
OIR    2025250     91400   18.9700 -113.4700       9.1       175       112        60
OIR    2025250     91400   18.9700 -113.4800       9.2       175       113        60
OIR    2025250     91400   18.9700 -113.4900       9.3       175       112        60
OIR    2025250     91400   18.9700 -113.5000       9.4       175       111        60
OIR    2025250     91400   18.9700 -113.5100       9.4       175       111        60
OIR    2025250     91400   18.9700 -113.5200       9.5       175       110        60
OIR    2025250     91400   18.9700 -113.5300       9.5       175       110        60
OIR    2025250     91400   18.9700 -113.5400       9.5       175       111        60
OIR    2025250     91400   18.9700 -113.5500       9.5       175       112        60
OIR    2025250     91400   18.9700 -113.5600       9.6       175       112        60
OIR    2025250     91400   18.9700 -113.5700       9.6       175       112        60
OIR    2025250     91400   18.9700 -113.5800       9.6       175       112        60
OIR    2025250     91400   18.9700 -113.5900       9.6       175       112        60
OIR    2025250     91400   18.9700 -113.6000       9.6       175       113        60
OIR    2025250     91400   18.9700 -113.6100       9.7       176       113        60
OIR    2025250     91400   18.9700 -113.6200       9.7       176       114        60
OIR    2025250     91400   18.9700 -113.6300       9.7       176       114        60
OIR    2025250     91400   18.9700 -113.6400       9.7       176       113        60
OIR    2025250     91400   18.9700 -113.6500       9.7       176       113        60
OIR    2025250     91400   18.9700 -113.6600       9.7       176       112        60
OIR    2025250     91400   18.9700 -113.6700       9.7       177       113        60
OIR    2025250     91400   18.9700 -113.6800       9.8       177       114        60
OIR    2025250     91400   18.9700 -113.6900      10.0       178       116        60
OIR    2025250     91400   18.9700 -113.7000      10.2       181       117        60
OIR    2025250     91400   18.9700 -113.7100      10.4       182       119        60
OIR    2025250     91400   18.9700 -113.7200      10.4       183       120        60
OIR    2025250     91400   18.9700 -113.7300      10.5       183       121        60
OIR    2025250     91400   18.9700 -113.7400      10.5       184       120        60
OIR    2025250     91400   18.9700 -113.7500      10.5       184       119        60
OIR    2025250     91400   18.9700 -113.7600      10.6       184       117        60
OIR    2025250     91400   18.9700 -113.7700      10.6       185       120        60
OIR    2025250     91400   18.9700 -113.7800      10.6       185       121        60
OIR    2025250     91400   18.9700 -113.7900      10.7       186       123        60
OIR    2025250     91400   18.9700 -113.8000      10.8       187       125        60
OIR    2025250     91400   18.9700 -113.8100      11.0       187       125        60
OIR    2025250     91400   18.9700 -113.8200      11.1       187       124        60
OIR    2025250     91400   18.9700 -113.8300      11.1       188       123        60
OIR    2025250     91400   18.9700 -113.8400      11.2       188       123        60
OIR    2025250     91400   18.9700 -113.8500      11.2       188       122        60
OIR    2025250     91400   18.9700 -113.8600      11.2       188       122        60
OIR    2025250     91400   18.9700 -113.8700      11.3       188       122        60
OIR    2025250     91400   18.9700 -113.8800      11.3       188       122        60
OIR    2025250     91400   18.9700 -113.8900      11.3       188       122        60
OIR    2025250     91400   18.9700 -113.9000      11.3       188       121        60
OIR    2025250     91400   18.9700 -113.9100      11.3       188       117        60
OIR    2025250     91400   18.9700 -113.9200      11.3       188       117        60
OIR    2025250     91400   18.9700 -113.9300      11.3       188       117        60
OIR    2025250     91400   18.9700 -113.9400      11.3       188       119        60
OIR    2025250     91400   18.9700 -113.9500      11.3       189       119        60
OIR    2025250     91400   18.9700 -113.9600      11.3       189       120        60
OIR    2025250     91400   18.9700 -113.9700      11.3       189       121        60
OIR    2025250     91400   18.9700 -113.9800      11.3       189       121        60
OIR    2025250     91400   18.9700 -113.9900      11.3       189       122        60
OIR    2025250     91400   18.9700 -114.0000      11.3       189       122        60
OIR    2025250     91400   18.9700 -114.0100      11.3       189       123        60
OIR    2025250     91400   18.9700 -114.0200      11.3       189       124        60
OIR    2025250     91400   18.9700 -114.0300      11.3       189       125        60
OIR    2025250     91400   18.9700 -114.0400      11.3       190       127        60
OIR    2025250     91400   18.9700 -114.0500      11.3       190       128        60
OIR    2025250     91400   18.9700 -114.0600      11.3       190       128        60
OIR    2025250     91400   18.9700 -114.0700      11.3       190       127        60
OIR    2025250     91400   18.9700 -114.0800      11.3       190       131        60
OIR    2025250     91400   18.9700 -114.0900      11.4       190       138        60
OIR    2025250     91400   18.9700 -114.1000      11.4       191       141        60
OIR    2025250     91400   18.9700 -114.1100      11.4       191       139        60
OIR    2025250     91400   18.9700 -114.1200      11.4       191       137        60
OIR    2025250     91400   18.9700 -114.1300      11.4       191       140        60
OIR    2025250     91400   18.9700 -114.1600      11.3       191       138        60
OIR    2025250     91400   18.9700 -114.1700      11.4       191       140        60
OIR    2025250     91400   18.9600 -110.4300      14.5        91       143        60
OIR    2025250     91400   18.9600 -110.4400      14.8        86       140        60
OIR    2025250     91400   18.9600 -110.4500      15.8        77       138        60
OIR    2025250     91400   18.9600 -110.4600      15.7        74       136        60
OIR    2025250     91400   18.9600 -110.4700      16.1        74       135        60
OIR    2025250     91400   18.9600 -110.4800      15.8        74       133        60
OIR    2025250     91400   18.9600 -110.4900      16.4        75       136        60
OIR    2025250     91400   18.9600 -110.5000      17.1        79       139        60
OIR    2025250     91400   18.9600 -111.4000      14.2        93       141        60
OIR    2025250     91400   18.9600 -111.4100      13.8        88       135        60
OIR    2025250     91400   18.9600 -111.4200      13.8        86       130        60
OIR    2025250     91400   18.9600 -111.4300      13.7        86       125        60
OIR    2025250     91400   18.9600 -111.4400      13.5        87       119        60
OIR    2025250     91400   18.9600 -111.4500      13.1        98       114        60
OIR    2025250     91400   18.9600 -111.4600      13.4       104       109        60
OIR    2025250     91400   18.9600 -111.4700      13.6       105       105        60
OIR    2025250     91400   18.9600 -111.4800      13.6       105       104        60
OIR    2025250     91400   18.9600 -111.4900      13.6       105       103        60
OIR    2025250     91400   18.9600 -111.5000      13.6       105       103        60
OIR    2025250     91400   18.9600 -111.5100      13.5       105       103        60
OIR    2025250     91400   18.9600 -111.5200      13.5       105       104        60
OIR    2025250     91400   18.9600 -111.5300      13.5       105       104        60
OIR    2025250     91400   18.9600 -111.5400      13.5       105       104        60
OIR    2025250     91400   18.9600 -111.5500      13.4       105       104        60
OIR    2025250     91400   18.9600 -111.5600      13.4       104       104        60
OIR    2025250     91400   18.9600 -111.5700      13.4       104       104        60
OIR    2025250     91400   18.9600 -111.5800      13.4       104       104        60
OIR    2025250     91400   18.9600 -111.5900      13.3       104       104        60
OIR    2025250     91400   18.9600 -111.6000      13.3       103       104        60
OIR    2025250     91400   18.9600 -111.6100      13.3       103       104        60
OIR    2025250     91400   18.9600 -111.6200      13.0       101       104        60
OIR    2025250     91400   18.9600 -111.6300      12.6        97       105        60
OIR    2025250     91400   18.9600 -111.6400      12.4        94       107        60
OIR    2025250     91400   18.9600 -111.6500      12.2        89       112        60
OIR    2025250     91400   18.9600 -111.6600      11.9        85       120        60
OIR    2025250     91400   18.9600 -111.6700      11.9        83       128        60
OIR    2025250     91400   18.9600 -111.6800      12.0        83       137        60
OIR    2025250     91400   18.9600 -113.0000       7.1       150       141        60
OIR    2025250     91400   18.9600 -113.0100       7.1       150       141        60
OIR    2025250     91400   18.9600 -113.0200       7.1       150       142        60
OIR    2025250     91400   18.9600 -113.0300       7.1       150       141        60
OIR    2025250     91400   18.9600 -113.0400       7.1       150       139        60
OIR    2025250     91400   18.9600 -113.0500       7.1       150       139        60
OIR    2025250     91400   18.9600 -113.0600       7.1       150       141        60
OIR    2025250     91400   18.9600 -113.0700       7.1       150       141        60
OIR    2025250     91400   18.9600 -113.0800       7.1       150       140        60
OIR    2025250     91400   18.9600 -113.0900       7.1       150       138        60
OIR    2025250     91400   18.9600 -113.1000       7.1       150       137        60
OIR    2025250     91400   18.9600 -113.1100       7.1       150       136        60
OIR    2025250     91400   18.9600 -113.1200       7.1       150       135        60
OIR    2025250     91400   18.9600 -113.1300       7.1       151       134        60
OIR    2025250     91400   18.9600 -113.1400       7.1       151       133        60
OIR    2025250     91400   18.9600 -113.1500       7.1       152       134        60
OIR    2025250     91400   18.9600 -113.1600       7.1       155       136        60
OIR    2025250     91400   18.9600 -113.1700       7.1       157       137        60
OIR    2025250     91400   18.9600 -113.1800       7.1       158       139        60
OIR    2025250     91400   18.9600 -113.1900       7.1       161       136        60
OIR    2025250     91400   18.9600 -113.2000       7.2       165       133        60
OIR    2025250     91400   18.9600 -113.2100       7.3       168       130        60
OIR    2025250     91400   18.9600 -113.2200       7.3       169       127        60
OIR    2025250     91400   18.9600 -113.2300       7.4       170       125        60
OIR    2025250     91400   18.9600 -113.2400       7.5       171       126        60
OIR    2025250     91400   18.9600 -113.2500       7.6       172       128        60
OIR    2025250     91400   18.9600 -113.2600       7.7       173       125        60
OIR    2025250     91400   18.9600 -113.2700       7.8       174       121        60
OIR    2025250     91400   18.9600 -113.2800       7.8       174       120        60
OIR    2025250     91400   18.9600 -113.2900       7.8       174       121        60
OIR    2025250     91400   18.9600 -113.3000       7.8       174       122        60
OIR    2025250     91400   18.9600 -113.3100       7.9       174       121        60
OIR    2025250     91400   18.9600 -113.3200       7.9       174       121        60
OIR    2025250     91400   18.9600 -113.3300       7.9       174       119        60
OIR    2025250     91400   18.9600 -113.3400       8.0       174       116        60
OIR    2025250     91400   18.9600 -113.3500       8.1       174       114        60
OIR    2025250     91400   18.9600 -113.3600       8.2       174       114        60
OIR    2025250     91400   18.9600 -113.3700       8.3       174       114        60
OIR    2025250     91400   18.9600 -113.3800       8.4       174       115        60
OIR    2025250     91400   18.9600 -113.3900       8.5       174       115        60
OIR    2025250     91400   18.9600 -113.4000       8.6       174       115        60
OIR    2025250     91400   18.9600 -113.4100       8.7       174       114        60
OIR    2025250     91400   18.9600 -113.4200       8.7       174       115        60
OIR    2025250     91400   18.9600 -113.4300       8.8       174       116        60
OIR    2025250     91400   18.9600 -113.4400       8.9       174       116        60
OIR    2025250     91400   18.9600 -113.4500       9.0       174       114        60
OIR    2025250     91400   18.9600 -113.4600       9.1       174       112        60
OIR    2025250     91400   18.9600 -113.4700       9.2       174       112        60
OIR    2025250     91400   18.9600 -113.4800       9.2       174       112        60
OIR    2025250     91400   18.9600 -113.4900       9.3       174       112        60
OIR    2025250     91400   18.9600 -113.5000       9.4       174       112        60
OIR    2025250     91400   18.9600 -113.5100       9.4       175       111        60
OIR    2025250     91400   18.9600 -113.5200       9.5       175       111        60
OIR    2025250     91400   18.9600 -113.5300       9.5       175       111        60
OIR    2025250     91400   18.9600 -113.5400       9.5       175       111        60
OIR    2025250     91400   18.9600 -113.5500       9.5       175       111        60
OIR    2025250     91400   18.9600 -113.5600       9.6       175       111        60
OIR    2025250     91400   18.9600 -113.5700       9.6       175       111        60
OIR    2025250     91400   18.9600 -113.5800       9.6       175       112        60
OIR    2025250     91400   18.9600 -113.5900       9.6       175       113        60
OIR    2025250     91400   18.9600 -113.6000       9.7       175       113        60
OIR    2025250     91400   18.9600 -113.6100       9.7       176       113        60
OIR    2025250     91400   18.9600 -113.6200       9.7       176       113        60
OIR    2025250     91400   18.9600 -113.6300       9.7       176       114        60
OIR    2025250     91400   18.9600 -113.6400       9.7       176       114        60
OIR    2025250     91400   18.9600 -113.6500       9.7       176       114        60
OIR    2025250     91400   18.9600 -113.6600       9.7       176       113        60
OIR    2025250     91400   18.9600 -113.6700       9.8       177       114        60
OIR    2025250     91400   18.9600 -113.6800       9.8       177       115        60
OIR    2025250     91400   18.9600 -113.6900       9.9       178       116        60
OIR    2025250     91400   18.9600 -113.7000      10.1       180       116        60
OIR    2025250     91400   18.9600 -113.7100      10.4       182       116        60
OIR    2025250     91400   18.9600 -113.7200      10.5       183       119        60
OIR    2025250     91400   18.9600 -113.7300      10.5       183       121        60
OIR    2025250     91400   18.9600 -113.7400      10.5       184       122        60
OIR    2025250     91400   18.9600 -113.7500      10.6       184       121        60
OIR    2025250     91400   18.9600 -113.7600      10.6       184       121        60
OIR    2025250     91400   18.9600 -113.7700      10.6       185       122        60
OIR    2025250     91400   18.9600 -113.7800      10.7       185       123        60
OIR    2025250     91400   18.9600 -113.7900      10.7       186       124        60
OIR    2025250     91400   18.9600 -113.8000      10.9       187       125        60
OIR    2025250     91400   18.9600 -113.8100      11.1       187       125        60
OIR    2025250     91400   18.9600 -113.8200      11.2       187       124        60
OIR    2025250     91400   18.9600 -113.8300      11.2       188       123        60
OIR    2025250     91400   18.9600 -113.8400      11.2       188       123        60
OIR    2025250     91400   18.9600 -113.8500      11.3       188       123        60
OIR    2025250     91400   18.9600 -113.8600      11.3       188       122        60
OIR    2025250     91400   18.9600 -113.8700      11.3       188       122        60
OIR    2025250     91400   18.9600 -113.8800      11.3       188       122        60
OIR    2025250     91400   18.9600 -113.8900      11.3       188       121        60
OIR    2025250     91400   18.9600 -113.9000      11.3       188       121        60
OIR    2025250     91400   18.9600 -113.9100      11.3       188       120        60
OIR    2025250     91400   18.9600 -113.9200      11.3       188       119        60
OIR    2025250     91400   18.9600 -113.9300      11.3       188       119        60
OIR    2025250     91400   18.9600 -113.9400      11.3       189       119        60
OIR    2025250     91400   18.9600 -113.9500      11.3       189       119        60
OIR    2025250     91400   18.9600 -113.9600      11.3       189       120        60
OIR    2025250     91400   18.9600 -113.9700      11.3       189       121        60
OIR    2025250     91400   18.9600 -113.9800      11.3       189       122        60
OIR    2025250     91400   18.9600 -113.9900      11.3       189       123        60
OIR    2025250     91400   18.9600 -114.0000      11.3       189       123        60
OIR    2025250     91400   18.9600 -114.0100      11.3       189       123        60
OIR    2025250     91400   18.9600 -114.0200      11.3       189       124        60
OIR    2025250     91400   18.9600 -114.0300      11.4       190       125        60
OIR    2025250     91400   18.9600 -114.0400      11.4       190       126        60
OIR    2025250     91400   18.9600 -114.0500      11.4       190       127        60
OIR    2025250     91400   18.9600 -114.0600      11.4       190       129        60
OIR    2025250     91400   18.9600 -114.0700      11.4       190       129        60
OIR    2025250     91400   18.9600 -114.0800      11.5       190       132        60
OIR    2025250     91400   18.9600 -114.0900      11.5       191       137        60
OIR    2025250     91400   18.9600 -114.1000      11.5       191       142        60
OIR    2025250     91400   18.9600 -114.1700      11.5       191       141        60
OIR    2025250     91400   18.9600 -114.6000      12.9       196       138        60
OIR    2025250     91400   18.9500 -110.4500      16.2        64       141        60
OIR    2025250     91400   18.9500 -110.4600      15.9        67       139        60
OIR    2025250     91400   18.9500 -110.4700      16.3        68       138        60
OIR    2025250     91400   18.9500 -110.4800      16.4        69       136        60
OIR    2025250     91400   18.9500 -110.4900      17.2        72       137        60
OIR    2025250     91400   18.9500 -110.5000      17.9        76       140        60
OIR    2025250     91400   18.9500 -110.5100      18.2        79       143        60
OIR    2025250     91400   18.9500 -111.3900      14.2        96       142        60
OIR    2025250     91400   18.9500 -111.4000      14.0        95       137        60
OIR    2025250     91400   18.9500 -111.4100      13.9        94       133        60
OIR    2025250     91400   18.9500 -111.4200      13.7        89       131        60
OIR    2025250     91400   18.9500 -111.4300      13.7        88       129        60
OIR    2025250     91400   18.9500 -111.4400      13.6        93       124        60
OIR    2025250     91400   18.9500 -111.4500      13.4       103       116        60
OIR    2025250     91400   18.9500 -111.4600      13.5       105       111        60
OIR    2025250     91400   18.9500 -111.4700      13.6       105       109        60
OIR    2025250     91400   18.9500 -111.4800      13.5       105       107        60
OIR    2025250     91400   18.9500 -111.4900      13.5       105       104        60
OIR    2025250     91400   18.9500 -111.5000      13.5       105       104        60
OIR    2025250     91400   18.9500 -111.5100      13.5       105       103        60
OIR    2025250     91400   18.9500 -111.5200      13.5       105       104        60
OIR    2025250     91400   18.9500 -111.5300      13.5       105       104        60
OIR    2025250     91400   18.9500 -111.5400      13.5       105       105        60
OIR    2025250     91400   18.9500 -111.5500      13.5       105       105        60
OIR    2025250     91400   18.9500 -111.5600      13.4       104       105        60
OIR    2025250     91400   18.9500 -111.5700      13.4       104       104        60
OIR    2025250     91400   18.9500 -111.5800      13.4       104       104        60
OIR    2025250     91400   18.9500 -111.5900      13.4       104       104        60
OIR    2025250     91400   18.9500 -111.6000      13.4       104       104        60
OIR    2025250     91400   18.9500 -111.6100      13.4       103       104        60
OIR    2025250     91400   18.9500 -111.6200      13.1       101       105        60
OIR    2025250     91400   18.9500 -111.6300      12.9        97       108        60
OIR    2025250     91400   18.9500 -111.6400      12.6        93       109        60
OIR    2025250     91400   18.9500 -111.6500      12.3        87       113        60
OIR    2025250     91400   18.9500 -111.6600      12.0        84       122        60
OIR    2025250     91400   18.9500 -111.6700      12.0        83       130        60
OIR    2025250     91400   18.9500 -111.6800      12.0        83       137        60
OIR    2025250     91400   18.9500 -113.0000       7.1       149       141        60
OIR    2025250     91400   18.9500 -113.0100       7.1       149       141        60
OIR    2025250     91400   18.9500 -113.0200       7.1       150       141        60
OIR    2025250     91400   18.9500 -113.0300       7.1       150       141        60
OIR    2025250     91400   18.9500 -113.0400       7.1       150       141        60
OIR    2025250     91400   18.9500 -113.0500       7.1       150       141        60
OIR    2025250     91400   18.9500 -113.0600       7.1       150       141        60
OIR    2025250     91400   18.9500 -113.0700       7.1       150       142        60
OIR    2025250     91400   18.9500 -113.0800       7.1       150       140        60
OIR    2025250     91400   18.9500 -113.0900       7.1       150       139        60
OIR    2025250     91400   18.9500 -113.1000       7.1       150       137        60
OIR    2025250     91400   18.9500 -113.1100       7.1       150       134        60
OIR    2025250     91400   18.9500 -113.1200       7.0       150       133        60
OIR    2025250     91400   18.9500 -113.1300       7.0       150       133        60
OIR    2025250     91400   18.9500 -113.1400       7.0       150       133        60
OIR    2025250     91400   18.9500 -113.1500       7.0       150       133        60
OIR    2025250     91400   18.9500 -113.1600       7.0       151       133        60
OIR    2025250     91400   18.9500 -113.1700       6.9       151       135        60
OIR    2025250     91400   18.9500 -113.1800       6.9       152       139        60
OIR    2025250     91400   18.9500 -113.1900       6.9       154       137        60
OIR    2025250     91400   18.9500 -113.2000       6.8       156       131        60
OIR    2025250     91400   18.9500 -113.2100       6.9       158       127        60
OIR    2025250     91400   18.9500 -113.2200       7.0       160       126        60
OIR    2025250     91400   18.9500 -113.2300       7.0       162       126        60
OIR    2025250     91400   18.9500 -113.2400       7.1       164       127        60
OIR    2025250     91400   18.9500 -113.2500       7.2       168       128        60
OIR    2025250     91400   18.9500 -113.2600       7.4       171       127        60
OIR    2025250     91400   18.9500 -113.2700       7.6       172       123        60
OIR    2025250     91400   18.9500 -113.2800       7.7       173       120        60
OIR    2025250     91400   18.9500 -113.2900       7.7       173       119        60
OIR    2025250     91400   18.9500 -113.3000       7.8       173       119        60
OIR    2025250     91400   18.9500 -113.3100       7.8       173       121        60
OIR    2025250     91400   18.9500 -113.3200       7.8       173       122        60
OIR    2025250     91400   18.9500 -113.3300       7.8       173       120        60
OIR    2025250     91400   18.9500 -113.3400       7.9       173       116        60
OIR    2025250     91400   18.9500 -113.3500       8.0       173       114        60
OIR    2025250     91400   18.9500 -113.3600       8.1       173       115        60
OIR    2025250     91400   18.9500 -113.3700       8.3       173       115        60
OIR    2025250     91400   18.9500 -113.3800       8.4       173       115        60
OIR    2025250     91400   18.9500 -113.3900       8.5       173       115        60
OIR    2025250     91400   18.9500 -113.4000       8.6       173       115        60
OIR    2025250     91400   18.9500 -113.4100       8.7       173       114        60
OIR    2025250     91400   18.9500 -113.4200       8.8       173       115        60
OIR    2025250     91400   18.9500 -113.4300       8.8       173       115        60
OIR    2025250     91400   18.9500 -113.4400       8.9       174       116        60
OIR    2025250     91400   18.9500 -113.4500       9.0       174       114        60
OIR    2025250     91400   18.9500 -113.4600       9.1       174       113        60
OIR    2025250     91400   18.9500 -113.4700       9.2       174       113        60
OIR    2025250     91400   18.9500 -113.4800       9.3       174       113        60
OIR    2025250     91400   18.9500 -113.4900       9.3       174       112        60
OIR    2025250     91400   18.9500 -113.5000       9.4       174       112        60
OIR    2025250     91400   18.9500 -113.5100       9.4       174       112        60
OIR    2025250     91400   18.9500 -113.5200       9.5       175       111        60
OIR    2025250     91400   18.9500 -113.5300       9.5       175       111        60
OIR    2025250     91400   18.9500 -113.5400       9.5       175       112        60
OIR    2025250     91400   18.9500 -113.5500       9.6       175       112        60
OIR    2025250     91400   18.9500 -113.5600       9.6       175       112        60
OIR    2025250     91400   18.9500 -113.5700       9.6       175       112        60
OIR    2025250     91400   18.9500 -113.5800       9.6       175       112        60
OIR    2025250     91400   18.9500 -113.5900       9.6       175       113        60
OIR    2025250     91400   18.9500 -113.6000       9.7       175       114        60
OIR    2025250     91400   18.9500 -113.6100       9.7       175       114        60
OIR    2025250     91400   18.9500 -113.6200       9.7       176       114        60
OIR    2025250     91400   18.9500 -113.6300       9.7       176       114        60
OIR    2025250     91400   18.9500 -113.6400       9.7       176       114        60
OIR    2025250     91400   18.9500 -113.6500       9.7       176       114        60
OIR    2025250     91400   18.9500 -113.6600       9.8       176       114        60
OIR    2025250     91400   18.9500 -113.6700       9.8       177       114        60
OIR    2025250     91400   18.9500 -113.6800       9.8       177       115        60
OIR    2025250     91400   18.9500 -113.6900       9.9       178       116        60
OIR    2025250     91400   18.9500 -113.7000      10.1       180       116        60
OIR    2025250     91400   18.9500 -113.7100      10.4       182       116        60
OIR    2025250     91400   18.9500 -113.7200      10.5       183       117        60
OIR    2025250     91400   18.9500 -113.7300      10.5       183       121        60
OIR    2025250     91400   18.9500 -113.7400      10.6       184       123        60
OIR    2025250     91400   18.9500 -113.7500      10.6       184       123        60
OIR    2025250     91400   18.9500 -113.7600      10.6       184       123        60
OIR    2025250     91400   18.9500 -113.7700      10.7       185       123        60
OIR    2025250     91400   18.9500 -113.7800      10.7       185       124        60
OIR    2025250     91400   18.9500 -113.7900      10.8       185       124        60
OIR    2025250     91400   18.9500 -113.8000      11.0       187       125        60
OIR    2025250     91400   18.9500 -113.8100      11.2       187       125        60
OIR    2025250     91400   18.9500 -113.8200      11.2       187       124        60
OIR    2025250     91400   18.9500 -113.8300      11.3       188       124        60
OIR    2025250     91400   18.9500 -113.8400      11.3       188       123        60
OIR    2025250     91400   18.9500 -113.8500      11.3       188       123        60
OIR    2025250     91400   18.9500 -113.8600      11.3       188       123        60
OIR    2025250     91400   18.9500 -113.8700      11.3       188       123        60
OIR    2025250     91400   18.9500 -113.8800      11.3       188       122        60
OIR    2025250     91400   18.9500 -113.8900      11.3       188       121        60
OIR    2025250     91400   18.9500 -113.9000      11.3       188       120        60
OIR    2025250     91400   18.9500 -113.9100      11.3       188       120        60
OIR    2025250     91400   18.9500 -113.9200      11.3       188       120        60
OIR    2025250     91400   18.9500 -113.9300      11.3       189       120        60
OIR    2025250     91400   18.9500 -113.9400      11.3       189       120        60
OIR    2025250     91400   18.9500 -113.9500      11.3       189       120        60
OIR    2025250     91400   18.9500 -113.9600      11.3       189       120        60
OIR    2025250     91400   18.9500 -113.9700      11.3       189       121        60
OIR    2025250     91400   18.9500 -113.9800      11.3       189       122        60
OIR    2025250     91400   18.9500 -113.9900      11.3       189       122        60
OIR    2025250     91400   18.9500 -114.0000      11.3       189       122        60
OIR    2025250     91400   18.9500 -114.0100      11.4       189       122        60
OIR    2025250     91400   18.9500 -114.0200      11.4       190       124        60
OIR    2025250     91400   18.9500 -114.0300      11.4       190       125        60
OIR    2025250     91400   18.9500 -114.0400      11.4       190       126        60
OIR    2025250     91400   18.9500 -114.0500      11.5       191       126        60
OIR    2025250     91400   18.9500 -114.0600      11.5       191       127        60
OIR    2025250     91400   18.9500 -114.0700      11.5       191       130        60
OIR    2025250     91400   18.9500 -114.0800      11.6       191       133        60
OIR    2025250     91400   18.9500 -114.0900      11.6       191       133        60
OIR    2025250     91400   18.9500 -114.1000      11.6       191       134        60
OIR    2025250     91400   18.9500 -114.1100      11.5       191       139        60
OIR    2025250     91400   18.9500 -114.6000      13.1       196       134        60
OIR    2025250     91400   18.9500 -114.6100      13.0       196       138        60
OIR    2025250     91400   18.9400 -110.4600      17.0        61       143        60
OIR    2025250     91400   18.9400 -110.4700      17.1        64       143        60
OIR    2025250     91400   18.9400 -110.4800      17.3        66       143        60
OIR    2025250     91400   18.9400 -110.4900      17.9        69       143        60
OIR    2025250     91400   18.9400 -110.5000      18.6        71       142        60
OIR    2025250     91400   18.9400 -110.5100      18.7        74       143        60
OIR    2025250     91400   18.9400 -111.3500      13.1        94       141        60
OIR    2025250     91400   18.9400 -111.3600      14.0        96       139        60
OIR    2025250     91400   18.9400 -111.3700      14.1        96       137        60
OIR    2025250     91400   18.9400 -111.3800      14.1        96       136        60
OIR    2025250     91400   18.9400 -111.3900      14.1        96       135        60
OIR    2025250     91400   18.9400 -111.4000      14.1        95       132        60
OIR    2025250     91400   18.9400 -111.4100      14.0        95       129        60
OIR    2025250     91400   18.9400 -111.4200      14.0        94       129        60
OIR    2025250     91400   18.9400 -111.4300      13.9        95       129        60
OIR    2025250     91400   18.9400 -111.4400      13.7        98       128        60
OIR    2025250     91400   18.9400 -111.4500      13.6       105       121        60
OIR    2025250     91400   18.9400 -111.4600      13.5       105       113        60
OIR    2025250     91400   18.9400 -111.4700      13.5       105       112        60
OIR    2025250     91400   18.9400 -111.4800      13.5       105       110        60
OIR    2025250     91400   18.9400 -111.4900      13.5       105       108        60
OIR    2025250     91400   18.9400 -111.5000      13.5       105       105        60
OIR    2025250     91400   18.9400 -111.5100      13.5       105       104        60
OIR    2025250     91400   18.9400 -111.5200      13.5       105       104        60
OIR    2025250     91400   18.9400 -111.5300      13.5       105       105        60
OIR    2025250     91400   18.9400 -111.5400      13.5       105       105        60
OIR    2025250     91400   18.9400 -111.5500      13.5       105       105        60
OIR    2025250     91400   18.9400 -111.5600      13.5       104       105        60
OIR    2025250     91400   18.9400 -111.5700      13.4       104       104        60
OIR    2025250     91400   18.9400 -111.5800      13.4       104       104        60
OIR    2025250     91400   18.9400 -111.5900      13.4       104       104        60
OIR    2025250     91400   18.9400 -111.6000      13.4       104       104        60
OIR    2025250     91400   18.9400 -111.6100      13.4       103       104        60
OIR    2025250     91400   18.9400 -111.6200      13.3       102       107        60
OIR    2025250     91400   18.9400 -111.6300      12.9        98       109        60
OIR    2025250     91400   18.9400 -111.6400      12.7        95       112        60
OIR    2025250     91400   18.9400 -111.6500      12.5        89       116        60
OIR    2025250     91400   18.9400 -111.6600      12.2        85       123        60
OIR    2025250     91400   18.9400 -111.6700      12.1        84       130        60
OIR    2025250     91400   18.9400 -111.6800      12.0        83       136        60
OIR    2025250     91400   18.9400 -111.6900      12.0        83       141        60
OIR    2025250     91400   18.9400 -113.0000       7.1       149       140        60
OIR    2025250     91400   18.9400 -113.0100       7.1       149       139        60
OIR    2025250     91400   18.9400 -113.0200       7.1       149       140        60
OIR    2025250     91400   18.9400 -113.0300       7.1       149       141        60
OIR    2025250     91400   18.9400 -113.0400       7.1       149       142        60
OIR    2025250     91400   18.9400 -113.0600       7.1       149       142        60
OIR    2025250     91400   18.9400 -113.0700       7.1       149       142        60
OIR    2025250     91400   18.9400 -113.0800       7.1       149       140        60
OIR    2025250     91400   18.9400 -113.0900       7.1       149       138        60
OIR    2025250     91400   18.9400 -113.1000       7.1       149       136        60
OIR    2025250     91400   18.9400 -113.1100       7.0       149       134        60
OIR    2025250     91400   18.9400 -113.1200       7.0       149       133        60
OIR    2025250     91400   18.9400 -113.1300       7.0       149       133        60
OIR    2025250     91400   18.9400 -113.1400       7.0       149       134        60
OIR    2025250     91400   18.9400 -113.1500       7.0       150       133        60
OIR    2025250     91400   18.9400 -113.1600       7.0       150       133        60
OIR    2025250     91400   18.9400 -113.1700       6.9       150       133        60
OIR    2025250     91400   18.9400 -113.1800       6.9       151       134        60
OIR    2025250     91400   18.9400 -113.1900       6.9       152       135        60
OIR    2025250     91400   18.9400 -113.2000       6.8       153       131        60
OIR    2025250     91400   18.9400 -113.2100       6.8       154       128        60
OIR    2025250     91400   18.9400 -113.2200       6.8       155       127        60
OIR    2025250     91400   18.9400 -113.2300       6.8       157       126        60
OIR    2025250     91400   18.9400 -113.2400       6.9       159       127        60
OIR    2025250     91400   18.9400 -113.2500       7.0       162       128        60
OIR    2025250     91400   18.9400 -113.2600       7.1       166       128        60
OIR    2025250     91400   18.9400 -113.2700       7.3       169       126        60
OIR    2025250     91400   18.9400 -113.2800       7.4       171       123        60
OIR    2025250     91400   18.9400 -113.2900       7.5       171       120        60
OIR    2025250     91400   18.9400 -113.3000       7.6       172       117        60
OIR    2025250     91400   18.9400 -113.3100       7.6       172       119        60
OIR    2025250     91400   18.9400 -113.3200       7.6       172       120        60
OIR    2025250     91400   18.9400 -113.3300       7.6       171       120        60
OIR    2025250     91400   18.9400 -113.3400       7.7       171       117        60
OIR    2025250     91400   18.9400 -113.3500       7.8       172       116        60
OIR    2025250     91400   18.9400 -113.3600       8.0       172       116        60
OIR    2025250     91400   18.9400 -113.3700       8.2       172       116        60
OIR    2025250     91400   18.9400 -113.3800       8.4       172       116        60
OIR    2025250     91400   18.9400 -113.3900       8.5       172       116        60
OIR    2025250     91400   18.9400 -113.4000       8.6       173       116        60
OIR    2025250     91400   18.9400 -113.4100       8.7       173       115        60
OIR    2025250     91400   18.9400 -113.4200       8.8       173       114        60
OIR    2025250     91400   18.9400 -113.4300       8.9       173       115        60
OIR    2025250     91400   18.9400 -113.4400       8.9       173       116        60
OIR    2025250     91400   18.9400 -113.4500       9.1       174       115        60
OIR    2025250     91400   18.9400 -113.4600       9.1       174       114        60
OIR    2025250     91400   18.9400 -113.4700       9.2       174       113        60
OIR    2025250     91400   18.9400 -113.4800       9.3       174       113        60
OIR    2025250     91400   18.9400 -113.4900       9.4       174       113        60
OIR    2025250     91400   18.9400 -113.5000       9.4       174       113        60
OIR    2025250     91400   18.9400 -113.5100       9.5       174       112        60
OIR    2025250     91400   18.9400 -113.5200       9.5       174       112        60
OIR    2025250     91400   18.9400 -113.5300       9.5       175       112        60
OIR    2025250     91400   18.9400 -113.5400       9.6       175       113        60
OIR    2025250     91400   18.9400 -113.5500       9.6       175       113        60
OIR    2025250     91400   18.9400 -113.5600       9.6       175       114        60
OIR    2025250     91400   18.9400 -113.5700       9.6       175       113        60
OIR    2025250     91400   18.9400 -113.5800       9.6       175       113        60
OIR    2025250     91400   18.9400 -113.5900       9.7       175       114        60
OIR    2025250     91400   18.9400 -113.6000       9.7       175       114        60
OIR    2025250     91400   18.9400 -113.6100       9.7       175       114        60
OIR    2025250     91400   18.9400 -113.6200       9.7       176       115        60
OIR    2025250     91400   18.9400 -113.6300       9.7       176       114        60
OIR    2025250     91400   18.9400 -113.6400       9.8       176       114        60
OIR    2025250     91400   18.9400 -113.6500       9.8       176       114        60
OIR    2025250     91400   18.9400 -113.6600       9.8       176       114        60
OIR    2025250     91400   18.9400 -113.6700       9.8       177       114        60
OIR    2025250     91400   18.9400 -113.6800       9.9       178       114        60
OIR    2025250     91400   18.9400 -113.6900      10.0       179       115        60
OIR    2025250     91400   18.9400 -113.7000      10.2       180       116        60
OIR    2025250     91400   18.9400 -113.7100      10.4       182       116        60
OIR    2025250     91400   18.9400 -113.7200      10.5       183       117        60
OIR    2025250     91400   18.9400 -113.7300      10.6       183       120        60
OIR    2025250     91400   18.9400 -113.7400      10.6       184       122        60
OIR    2025250     91400   18.9400 -113.7500      10.6       184       122        60
OIR    2025250     91400   18.9400 -113.7600      10.7       184       123        60
OIR    2025250     91400   18.9400 -113.7700      10.7       185       122        60
OIR    2025250     91400   18.9400 -113.7800      10.8       185       121        60
OIR    2025250     91400   18.9400 -113.7900      10.9       185       121        60
OIR    2025250     91400   18.9400 -113.8000      11.1       186       121        60
OIR    2025250     91400   18.9400 -113.8100      11.2       187       121        60
OIR    2025250     91400   18.9400 -113.8200      11.3       187       123        60
OIR    2025250     91400   18.9400 -113.8300      11.3       188       124        60
OIR    2025250     91400   18.9400 -113.8400      11.3       188       123        60
OIR    2025250     91400   18.9400 -113.8500      11.3       188       123        60
OIR    2025250     91400   18.9400 -113.8600      11.3       188       122        60
OIR    2025250     91400   18.9400 -113.8700      11.3       188       122        60
OIR    2025250     91400   18.9400 -113.8800      11.3       188       122        60
OIR    2025250     91400   18.9400 -113.8900      11.3       188       121        60
OIR    2025250     91400   18.9400 -113.9000      11.3       188       121        60
OIR    2025250     91400   18.9400 -113.9100      11.3       188       121        60
OIR    2025250     91400   18.9400 -113.9200      11.3       189       121        60
OIR    2025250     91400   18.9400 -113.9300      11.3       189       120        60
OIR    2025250     91400   18.9400 -113.9400      11.3       189       120        60
OIR    2025250     91400   18.9400 -113.9500      11.3       189       120        60
OIR    2025250     91400   18.9400 -113.9600      11.3       189       120        60
OIR    2025250     91400   18.9400 -113.9700      11.3       189       120        60
OIR    2025250     91400   18.9400 -113.9800      11.4       189       122        60
OIR    2025250     91400   18.9400 -113.9900      11.4       189       123        60
OIR    2025250     91400   18.9400 -114.0000      11.4       189       123        60
OIR    2025250     91400   18.9400 -114.0100      11.4       190       122        60
OIR    2025250     91400   18.9400 -114.0200      11.4       190       124        60
OIR    2025250     91400   18.9400 -114.0300      11.5       190       126        60
OIR    2025250     91400   18.9400 -114.0400      11.5       191       127        60
OIR    2025250     91400   18.9400 -114.0500      11.5       191       126        60
OIR    2025250     91400   18.9400 -114.0600      11.6       191       126        60
OIR    2025250     91400   18.9400 -114.0700      11.6       191       130        60
OIR    2025250     91400   18.9400 -114.0800      11.6       191       134        60
OIR    2025250     91400   18.9400 -114.0900      11.6       191       133        60
OIR    2025250     91400   18.9400 -114.1000      11.6       191       131        60
OIR    2025250     91400   18.9400 -114.1100      11.6       191       136        60
OIR    2025250     91400   18.9400 -114.6000      13.3       198       140        60
OIR    2025250     91400   18.9300 -111.3400      12.4        86       136        60
OIR    2025250     91400   18.9300 -111.3500      13.2        93       131        60
OIR    2025250     91400   18.9300 -111.3600      14.0        96       129        60
OIR    2025250     91400   18.9300 -111.3700      14.1        96       127        60
OIR    2025250     91400   18.9300 -111.3800      14.1        96       127        60
OIR    2025250     91400   18.9300 -111.3900      14.1        96       127        60
OIR    2025250     91400   18.9300 -111.4000      14.1        96       126        60
OIR    2025250     91400   18.9300 -111.4100      14.1        96       124        60
OIR    2025250     91400   18.9300 -111.4200      14.1        96       124        60
OIR    2025250     91400   18.9300 -111.4300      14.0        96       125        60
OIR    2025250     91400   18.9300 -111.4400      13.9        99       126        60
OIR    2025250     91400   18.9300 -111.4500      13.6       105       123        60
OIR    2025250     91400   18.9300 -111.4600      13.5       105       119        60
OIR    2025250     91400   18.9300 -111.4700      13.5       105       116        60
OIR    2025250     91400   18.9300 -111.4800      13.5       106       115        60
OIR    2025250     91400   18.9300 -111.4900      13.5       105       112        60
OIR    2025250     91400   18.9300 -111.5000      13.5       105       110        60
OIR    2025250     91400   18.9300 -111.5100      13.5       105       108        60
OIR    2025250     91400   18.9300 -111.5200      13.5       105       108        60
OIR    2025250     91400   18.9300 -111.5300      13.5       105       108        60
OIR    2025250     91400   18.9300 -111.5400      13.5       105       108        60
OIR    2025250     91400   18.9300 -111.5500      13.5       105       108        60
OIR    2025250     91400   18.9300 -111.5600      13.5       104       107        60
OIR    2025250     91400   18.9300 -111.5700      13.5       104       105        60
OIR    2025250     91400   18.9300 -111.5800      13.4       104       104        60
OIR    2025250     91400   18.9300 -111.5900      13.4       104       104        60
OIR    2025250     91400   18.9300 -111.6000      13.4       104       105        60
OIR    2025250     91400   18.9300 -111.6100      13.4       104       107        60
OIR    2025250     91400   18.9300 -111.6200      13.3       102       109        60
OIR    2025250     91400   18.9300 -111.6300      13.1       100       111        60
OIR    2025250     91400   18.9300 -111.6400      12.9        97       116        60
OIR    2025250     91400   18.9300 -111.6500      12.8        94       120        60
OIR    2025250     91400   18.9300 -111.6600      12.6        88       125        60
OIR    2025250     91400   18.9300 -111.6700      12.3        85       131        60
OIR    2025250     91400   18.9300 -111.6800      12.1        83       136        60
OIR    2025250     91400   18.9300 -111.6900      12.0        83       140        60
OIR    2025250     91400   18.9300 -113.0000       7.0       149       140        60
OIR    2025250     91400   18.9300 -113.0100       7.1       149       140        60
OIR    2025250     91400   18.9300 -113.0200       7.1       149       141        60
OIR    2025250     91400   18.9300 -113.0300       7.1       149       142        60
OIR    2025250     91400   18.9300 -113.0700       7.1       149       142        60
OIR    2025250     91400   18.9300 -113.0800       7.1       149       140        60
OIR    2025250     91400   18.9300 -113.0900       7.1       149       138        60
OIR    2025250     91400   18.9300 -113.1000       7.0       149       136        60
OIR    2025250     91400   18.9300 -113.1100       7.0       149       135        60
OIR    2025250     91400   18.9300 -113.1200       7.0       149       134        60
OIR    2025250     91400   18.9300 -113.1300       7.0       149       134        60
OIR    2025250     91400   18.9300 -113.1400       7.0       149       134        60
OIR    2025250     91400   18.9300 -113.1500       7.0       149       134        60
OIR    2025250     91400   18.9300 -113.1600       7.0       149       133        60
OIR    2025250     91400   18.9300 -113.1700       6.9       150       132        60
OIR    2025250     91400   18.9300 -113.1800       6.9       150       131        60
OIR    2025250     91400   18.9300 -113.1900       6.9       151       130        60
OIR    2025250     91400   18.9300 -113.2000       6.8       151       129        60
OIR    2025250     91400   18.9300 -113.2100       6.8       152       128        60
OIR    2025250     91400   18.9300 -113.2200       6.8       153       127        60
OIR    2025250     91400   18.9300 -113.2300       6.8       155       126        60
OIR    2025250     91400   18.9300 -113.2400       6.8       156       127        60
OIR    2025250     91400   18.9300 -113.2500       6.8       158       129        60
OIR    2025250     91400   18.9300 -113.2600       6.9       162       129        60
OIR    2025250     91400   18.9300 -113.2700       7.1       166       128        60
OIR    2025250     91400   18.9300 -113.2800       7.2       168       127        60
OIR    2025250     91400   18.9300 -113.2900       7.3       169       123        60
OIR    2025250     91400   18.9300 -113.3000       7.4       170       119        60
OIR    2025250     91400   18.9300 -113.3100       7.5       170       116        60
OIR    2025250     91400   18.9300 -113.3200       7.5       170       116        60
OIR    2025250     91400   18.9300 -113.3300       7.5       170       117        60
OIR    2025250     91400   18.9300 -113.3400       7.6       170       119        60
OIR    2025250     91400   18.9300 -113.3500       7.7       170       119        60
OIR    2025250     91400   18.9300 -113.3600       7.9       171       117        60
OIR    2025250     91400   18.9300 -113.3700       8.1       171       116        60
OIR    2025250     91400   18.9300 -113.3800       8.3       172       116        60
OIR    2025250     91400   18.9300 -113.3900       8.4       172       116        60
OIR    2025250     91400   18.9300 -113.4000       8.6       172       116        60
OIR    2025250     91400   18.9300 -113.4100       8.7       172       116        60
OIR    2025250     91400   18.9300 -113.4200       8.8       173       115        60
OIR    2025250     91400   18.9300 -113.4300       8.9       173       116        60
OIR    2025250     91400   18.9300 -113.4400       9.0       173       116        60
OIR    2025250     91400   18.9300 -113.4500       9.1       173       116        60
OIR    2025250     91400   18.9300 -113.4600       9.2       174       115        60
OIR    2025250     91400   18.9300 -113.4700       9.3       174       114        60
OIR    2025250     91400   18.9300 -113.4800       9.3       174       114        60
OIR    2025250     91400   18.9300 -113.4900       9.4       174       114        60
OIR    2025250     91400   18.9300 -113.5000       9.4       174       113        60
OIR    2025250     91400   18.9300 -113.5100       9.5       174       112        60
OIR    2025250     91400   18.9300 -113.5200       9.5       174       112        60
OIR    2025250     91400   18.9300 -113.5300       9.5       175       113        60
OIR    2025250     91400   18.9300 -113.5400       9.6       175       114        60
OIR    2025250     91400   18.9300 -113.5500       9.6       175       114        60
OIR    2025250     91400   18.9300 -113.5600       9.6       175       115        60
OIR    2025250     91400   18.9300 -113.5700       9.6       175       115        60
OIR    2025250     91400   18.9300 -113.5800       9.6       175       115        60
OIR    2025250     91400   18.9300 -113.5900       9.7       175       115        60
OIR    2025250     91400   18.9300 -113.6000       9.7       175       115        60
OIR    2025250     91400   18.9300 -113.6100       9.7       175       115        60
OIR    2025250     91400   18.9300 -113.6200       9.7       176       115        60
OIR    2025250     91400   18.9300 -113.6300       9.8       176       115        60
OIR    2025250     91400   18.9300 -113.6400       9.8       176       115        60
OIR    2025250     91400   18.9300 -113.6500       9.8       176       114        60
OIR    2025250     91400   18.9300 -113.6600       9.8       177       114        60
OIR    2025250     91400   18.9300 -113.6700       9.9       177       113        60
OIR    2025250     91400   18.9300 -113.6800      10.0       178       114        60
OIR    2025250     91400   18.9300 -113.6900      10.2       179       115        60
OIR    2025250     91400   18.9300 -113.7000      10.3       181       116        60
OIR    2025250     91400   18.9300 -113.7100      10.4       182       116        60
OIR    2025250     91400   18.9300 -113.7200      10.5       183       119        60
OIR    2025250     91400   18.9300 -113.7300      10.6       183       120        60
OIR    2025250     91400   18.9300 -113.7400      10.6       184       121        60
OIR    2025250     91400   18.9300 -113.7500      10.7       184       122        60
OIR    2025250     91400   18.9300 -113.7600      10.7       184       122        60
OIR    2025250     91400   18.9300 -113.7700      10.8       185       121        60
OIR    2025250     91400   18.9300 -113.7800      10.9       185       120        60
OIR    2025250     91400   18.9300 -113.7900      11.0       186       119        60
OIR    2025250     91400   18.9300 -113.8000      11.2       186       119        60
OIR    2025250     91400   18.9300 -113.8100      11.3       187       119        60
OIR    2025250     91400   18.9300 -113.8200      11.3       187       121        60
OIR    2025250     91400   18.9300 -113.8300      11.3       188       124        60
OIR    2025250     91400   18.9300 -113.8400      11.4       188       124        60
OIR    2025250     91400   18.9300 -113.8500      11.4       188       123        60
OIR    2025250     91400   18.9300 -113.8600      11.4       188       122        60
OIR    2025250     91400   18.9300 -113.8700      11.4       188       121        60
OIR    2025250     91400   18.9300 -113.8800      11.4       188       121        60
OIR    2025250     91400   18.9300 -113.8900      11.4       188       122        60
OIR    2025250     91400   18.9300 -113.9000      11.4       188       122        60
OIR    2025250     91400   18.9300 -113.9100      11.4       188       122        60
OIR    2025250     91400   18.9300 -113.9200      11.4       189       121        60
OIR    2025250     91400   18.9300 -113.9300      11.4       189       121        60
OIR    2025250     91400   18.9300 -113.9400      11.4       189       120        60
OIR    2025250     91400   18.9300 -113.9500      11.4       189       120        60
OIR    2025250     91400   18.9300 -113.9600      11.4       189       120        60
OIR    2025250     91400   18.9300 -113.9700      11.4       189       120        60
OIR    2025250     91400   18.9300 -113.9800      11.4       189       121        60
OIR    2025250     91400   18.9300 -113.9900      11.4       190       123        60
OIR    2025250     91400   18.9300 -114.0000      11.4       190       123        60
OIR    2025250     91400   18.9300 -114.0100      11.4       190       123        60
OIR    2025250     91400   18.9300 -114.0200      11.5       190       125        60
OIR    2025250     91400   18.9300 -114.0300      11.5       190       126        60
OIR    2025250     91400   18.9300 -114.0400      11.5       191       128        60
OIR    2025250     91400   18.9300 -114.0500      11.6       191       129        60
OIR    2025250     91400   18.9300 -114.0600      11.6       191       130        60
OIR    2025250     91400   18.9300 -114.0700      11.6       191       131        60
OIR    2025250     91400   18.9300 -114.0800      11.6       191       132        60
OIR    2025250     91400   18.9300 -114.0900      11.6       191       133        60
OIR    2025250     91400   18.9300 -114.1000      11.6       191       133        60
OIR    2025250     91400   18.9300 -114.1100      11.6       191       136        60
OIR    2025250     91400   18.9300 -114.5800      13.9       199       139        60
OIR    2025250     91400   18.9200 -111.3400      12.5        85       134        60
OIR    2025250     91400   18.9200 -111.3500      13.2        90       128        60
OIR    2025250     91400   18.9200 -111.3600      14.0        95       125        60
OIR    2025250     91400   18.9200 -111.3700      14.1        96       124        60
OIR    2025250     91400   18.9200 -111.3800      14.1        96       124        60
OIR    2025250     91400   18.9200 -111.3900      14.1        96       124        60
OIR    2025250     91400   18.9200 -111.4000      14.1        96       123        60
OIR    2025250     91400   18.9200 -111.4100      14.1        96       121        60
OIR    2025250     91400   18.9200 -111.4200      14.1        96       120        60
OIR    2025250     91400   18.9200 -111.4300      14.1        96       122        60
OIR    2025250     91400   18.9200 -111.4400      13.9        98       125        60
OIR    2025250     91400   18.9200 -111.4500      13.5       104       124        60
OIR    2025250     91400   18.9200 -111.4600      13.5       105       123        60
OIR    2025250     91400   18.9200 -111.4700      13.5       105       121        60
OIR    2025250     91400   18.9200 -111.4800      13.5       106       119        60
OIR    2025250     91400   18.9200 -111.4900      13.5       106       116        60
OIR    2025250     91400   18.9200 -111.5000      13.5       105       114        60
OIR    2025250     91400   18.9200 -111.5100      13.5       105       112        60
OIR    2025250     91400   18.9200 -111.5200      13.5       105       111        60
OIR    2025250     91400   18.9200 -111.5300      13.5       105       111        60
OIR    2025250     91400   18.9200 -111.5400      13.5       105       110        60
OIR    2025250     91400   18.9200 -111.5500      13.5       105       109        60
OIR    2025250     91400   18.9200 -111.5600      13.5       105       108        60
OIR    2025250     91400   18.9200 -111.5700      13.4       104       105        60
OIR    2025250     91400   18.9200 -111.5800      13.4       104       104        60
OIR    2025250     91400   18.9200 -111.5900      13.4       104       105        60
OIR    2025250     91400   18.9200 -111.6000      13.4       104       108        60
OIR    2025250     91400   18.9200 -111.6100      13.4       104       109        60
OIR    2025250     91400   18.9200 -111.6200      13.3       103       111        60
OIR    2025250     91400   18.9200 -111.6300      13.1       100       113        60
OIR    2025250     91400   18.9200 -111.6400      13.0        96       119        60
OIR    2025250     91400   18.9200 -111.6500      13.0        93       125        60
OIR    2025250     91400   18.9200 -111.6600      12.8        91       128        60
OIR    2025250     91400   18.9200 -111.6700      12.5        87       132        60
OIR    2025250     91400   18.9200 -111.6800      12.2        84       135        60
OIR    2025250     91400   18.9200 -111.6900      12.0        83       141        60
OIR    2025250     91400   18.9200 -112.9900       7.0       149       142        60
OIR    2025250     91400   18.9200 -113.0000       7.0       149       141        60
OIR    2025250     91400   18.9200 -113.0100       7.0       149       140        60
OIR    2025250     91400   18.9200 -113.0800       7.1       149       142        60
OIR    2025250     91400   18.9200 -113.0900       7.0       149       142        60
OIR    2025250     91400   18.9200 -113.1000       7.0       149       142        60
OIR    2025250     91400   18.9200 -113.1100       7.0       148       141        60
OIR    2025250     91400   18.9200 -113.1200       7.0       148       141        60
OIR    2025250     91400   18.9200 -113.1300       7.0       148       139        60
OIR    2025250     91400   18.9200 -113.1400       7.0       148       137        60
OIR    2025250     91400   18.9200 -113.1500       7.0       149       135        60
OIR    2025250     91400   18.9200 -113.1600       7.0       149       134        60
OIR    2025250     91400   18.9200 -113.1700       6.9       149       133        60
OIR    2025250     91400   18.9200 -113.1800       6.9       150       132        60
OIR    2025250     91400   18.9200 -113.1900       6.9       150       131        60
OIR    2025250     91400   18.9200 -113.2000       6.9       151       130        60
OIR    2025250     91400   18.9200 -113.2100       6.8       151       129        60
OIR    2025250     91400   18.9200 -113.2200       6.8       152       128        60
OIR    2025250     91400   18.9200 -113.2300       6.8       153       127        60
OIR    2025250     91400   18.9200 -113.2400       6.8       154       127        60
OIR    2025250     91400   18.9200 -113.2500       6.8       156       127        60
OIR    2025250     91400   18.9200 -113.2600       6.8       159       128        60
OIR    2025250     91400   18.9200 -113.2700       6.9       162       128        60
OIR    2025250     91400   18.9200 -113.2800       7.0       165       128        60
OIR    2025250     91400   18.9200 -113.2900       7.2       167       126        60
OIR    2025250     91400   18.9200 -113.3000       7.3       169       122        60
OIR    2025250     91400   18.9200 -113.3100       7.4       169       119        60
OIR    2025250     91400   18.9200 -113.3200       7.5       169       117        60
OIR    2025250     91400   18.9200 -113.3300       7.5       169       116        60
OIR    2025250     91400   18.9200 -113.3400       7.6       170       117        60
OIR    2025250     91400   18.9200 -113.3500       7.7       170       120        60
OIR    2025250     91400   18.9200 -113.3600       7.8       170       119        60
OIR    2025250     91400   18.9200 -113.3700       8.1       170       117        60
OIR    2025250     91400   18.9200 -113.3800       8.2       171       116        60
OIR    2025250     91400   18.9200 -113.3900       8.4       171       117        60
OIR    2025250     91400   18.9200 -113.4000       8.5       172       117        60
OIR    2025250     91400   18.9200 -113.4100       8.6       172       116        60
OIR    2025250     91400   18.9200 -113.4200       8.7       172       116        60
OIR    2025250     91400   18.9200 -113.4300       8.8       172       116        60
OIR    2025250     91400   18.9200 -113.4400       8.9       173       116        60
OIR    2025250     91400   18.9200 -113.4500       9.1       173       116        60
OIR    2025250     91400   18.9200 -113.4600       9.2       173       116        60
OIR    2025250     91400   18.9200 -113.4700       9.3       174       116        60
OIR    2025250     91400   18.9200 -113.4800       9.3       174       115        60
OIR    2025250     91400   18.9200 -113.4900       9.4       174       114        60
OIR    2025250     91400   18.9200 -113.5000       9.4       174       113        60
OIR    2025250     91400   18.9200 -113.5100       9.5       174       112        60
OIR    2025250     91400   18.9200 -113.5200       9.5       174       112        60
OIR    2025250     91400   18.9200 -113.5300       9.5       174       114        60
OIR    2025250     91400   18.9200 -113.5400       9.6       175       115        60
OIR    2025250     91400   18.9200 -113.5500       9.6       175       115        60
OIR    2025250     91400   18.9200 -113.5600       9.6       175       115        60
OIR    2025250     91400   18.9200 -113.5700       9.6       175       116        60
OIR    2025250     91400   18.9200 -113.5800       9.6       175       116        60
OIR    2025250     91400   18.9200 -113.5900       9.7       175       116        60
OIR    2025250     91400   18.9200 -113.6000       9.7       175       116        60
OIR    2025250     91400   18.9200 -113.6100       9.7       175       116        60
OIR    2025250     91400   18.9200 -113.6200       9.7       176       116        60
OIR    2025250     91400   18.9200 -113.6300       9.8       176       116        60
OIR    2025250     91400   18.9200 -113.6400       9.8       176       116        60
OIR    2025250     91400   18.9200 -113.6500       9.9       177       115        60
OIR    2025250     91400   18.9200 -113.6600       9.9       177       115        60
OIR    2025250     91400   18.9200 -113.6700      10.0       178       114        60
OIR    2025250     91400   18.9200 -113.6800      10.1       179       114        60
OIR    2025250     91400   18.9200 -113.6900      10.3       180       115        60
OIR    2025250     91400   18.9200 -113.7000      10.4       181       116        60
OIR    2025250     91400   18.9200 -113.7100      10.5       182       119        60
OIR    2025250     91400   18.9200 -113.7200      10.6       183       121        60
OIR    2025250     91400   18.9200 -113.7300      10.6       183       121        60
OIR    2025250     91400   18.9200 -113.7400      10.7       184       121        60
OIR    2025250     91400   18.9200 -113.7500      10.7       184       122        60
OIR    2025250     91400   18.9200 -113.7600      10.8       184       122        60
OIR    2025250     91400   18.9200 -113.7700      10.9       185       122        60
OIR    2025250     91400   18.9200 -113.7800      11.0       185       122        60
OIR    2025250     91400   18.9200 -113.7900      11.1       186       121        60
OIR    2025250     91400   18.9200 -113.8000      11.2       186       120        60
OIR    2025250     91400   18.9200 -113.8100      11.3       187       120        60
OIR    2025250     91400   18.9200 -113.8200      11.4       187       121        60
OIR    2025250     91400   18.9200 -113.8300      11.4       188       123        60
OIR    2025250     91400   18.9200 -113.8400      11.4       188       123        60
OIR    2025250     91400   18.9200 -113.8500      11.4       188       123        60
OIR    2025250     91400   18.9200 -113.8600      11.4       188       122        60
OIR    2025250     91400   18.9200 -113.8700      11.4       188       121        60
OIR    2025250     91400   18.9200 -113.8800      11.4       188       119        60
OIR    2025250     91400   18.9200 -113.8900      11.4       188       121        60
OIR    2025250     91400   18.9200 -113.9000      11.4       188       122        60
OIR    2025250     91400   18.9200 -113.9100      11.4       189       122        60
OIR    2025250     91400   18.9200 -113.9200      11.4       189       122        60
OIR    2025250     91400   18.9200 -113.9300      11.4       189       121        60
OIR    2025250     91400   18.9200 -113.9400      11.4       189       121        60
OIR    2025250     91400   18.9200 -113.9500      11.4       189       120        60
OIR    2025250     91400   18.9200 -113.9600      11.4       189       121        60
OIR    2025250     91400   18.9200 -113.9700      11.4       189       121        60
OIR    2025250     91400   18.9200 -113.9800      11.4       190       122        60
OIR    2025250     91400   18.9200 -113.9900      11.4       190       123        60
OIR    2025250     91400   18.9200 -114.0000      11.4       190       123        60
OIR    2025250     91400   18.9200 -114.0100      11.5       190       124        60
OIR    2025250     91400   18.9200 -114.0200      11.5       190       125        60
OIR    2025250     91400   18.9200 -114.0300      11.6       191       127        60
OIR    2025250     91400   18.9200 -114.0400      11.6       191       128        60
OIR    2025250     91400   18.9200 -114.0500      11.6       191       130        60
OIR    2025250     91400   18.9200 -114.0600      11.6       191       132        60
OIR    2025250     91400   18.9200 -114.0700      11.6       191       132        60
OIR    2025250     91400   18.9200 -114.0800      11.6       191       132        60
OIR    2025250     91400   18.9200 -114.0900      11.6       191       133        60
OIR    2025250     91400   18.9200 -114.1000      11.7       191       135        60
OIR    2025250     91400   18.9200 -114.1100      11.7       191       137        60
OIR    2025250     91400   18.9200 -114.1200      11.6       191       141        60
OIR    2025250     91400   18.9200 -114.5600      14.0       199       140        60
OIR    2025250     91400   18.9200 -114.5700      14.0       199       140        60
OIR    2025250     91400   18.9200 -114.5800      14.0       199       140        60
OIR    2025250     91400   18.9100 -111.3300      12.3        80       139        60
OIR    2025250     91400   18.9100 -111.3400      12.6        85       132        60
OIR    2025250     91400   18.9100 -111.3500      13.4        91       125        60
OIR    2025250     91400   18.9100 -111.3600      14.0        95       124        60
OIR    2025250     91400   18.9100 -111.3700      14.1        96       123        60
OIR    2025250     91400   18.9100 -111.3800      14.1        96       125        60
OIR    2025250     91400   18.9100 -111.3900      14.1        96       127        60
OIR    2025250     91400   18.9100 -111.4000      14.1        96       127        60
OIR    2025250     91400   18.9100 -111.4100      14.1        96       123        60
OIR    2025250     91400   18.9100 -111.4200      14.1        96       119        60
OIR    2025250     91400   18.9100 -111.4300      14.1        96       121        60
OIR    2025250     91400   18.9100 -111.4400      14.0        96       123        60
OIR    2025250     91400   18.9100 -111.4500      13.6       100       123        60
OIR    2025250     91400   18.9100 -111.4600      13.5       104       123        60
OIR    2025250     91400   18.9100 -111.4700      13.5       105       123        60
OIR    2025250     91400   18.9100 -111.4800      13.5       105       121        60
OIR    2025250     91400   18.9100 -111.4900      13.5       105       120        60
OIR    2025250     91400   18.9100 -111.5000      13.5       105       116        60
OIR    2025250     91400   18.9100 -111.5100      13.5       105       114        60
OIR    2025250     91400   18.9100 -111.5200      13.5       105       114        60
OIR    2025250     91400   18.9100 -111.5300      13.4       105       114        60
OIR    2025250     91400   18.9100 -111.5400      13.4       105       114        60
OIR    2025250     91400   18.9100 -111.5500      13.4       105       112        60
OIR    2025250     91400   18.9100 -111.5600      13.4       104       111        60
OIR    2025250     91400   18.9100 -111.5700      13.4       104       109        60
OIR    2025250     91400   18.9100 -111.5800      13.4       104       105        60
OIR    2025250     91400   18.9100 -111.5900      13.4       104       107        60
OIR    2025250     91400   18.9100 -111.6000      13.4       104       110        60
OIR    2025250     91400   18.9100 -111.6100      13.4       104       112        60
OIR    2025250     91400   18.9100 -111.6200      13.3       103       115        60
OIR    2025250     91400   18.9100 -111.6300      13.2       101       117        60
OIR    2025250     91400   18.9100 -111.6400      13.0        97       122        60
OIR    2025250     91400   18.9100 -111.6500      12.9        94       127        60
OIR    2025250     91400   18.9100 -111.6600      12.8        92       130        60
OIR    2025250     91400   18.9100 -111.6700      12.5        88       133        60
OIR    2025250     91400   18.9100 -111.6800      12.1        84       135        60
OIR    2025250     91400   18.9100 -111.6900      11.9        83       141        60
OIR    2025250     91400   18.9100 -112.9900       6.9       148       142        60
OIR    2025250     91400   18.9100 -113.0000       7.0       148       141        60
OIR    2025250     91400   18.9100 -113.0100       7.0       149       140        60
OIR    2025250     91400   18.9100 -113.0700       7.1       149       142        60
OIR    2025250     91400   18.9100 -113.0800       7.1       149       142        60
OIR    2025250     91400   18.9100 -113.1400       7.0       148       140        60
OIR    2025250     91400   18.9100 -113.1500       7.0       148       136        60
OIR    2025250     91400   18.9100 -113.1600       7.0       148       135        60
OIR    2025250     91400   18.9100 -113.1700       7.0       149       134        60
OIR    2025250     91400   18.9100 -113.1800       6.9       149       133        60
OIR    2025250     91400   18.9100 -113.1900       6.9       150       132        60
OIR    2025250     91400   18.9100 -113.2000       6.9       150       131        60
OIR    2025250     91400   18.9100 -113.2100       6.8       151       130        60
OIR    2025250     91400   18.9100 -113.2200       6.8       151       129        60
OIR    2025250     91400   18.9100 -113.2300       6.8       152       128        60
OIR    2025250     91400   18.9100 -113.2400       6.8       153       127        60
OIR    2025250     91400   18.9100 -113.2500       6.8       154       126        60
OIR    2025250     91400   18.9100 -113.2600       6.8       156       125        60
OIR    2025250     91400   18.9100 -113.2700       6.8       159       126        60
OIR    2025250     91400   18.9100 -113.2800       6.9       161       128        60
OIR    2025250     91400   18.9100 -113.2900       6.9       163       127        60
OIR    2025250     91400   18.9100 -113.3000       7.1       165       125        60
OIR    2025250     91400   18.9100 -113.3100       7.3       167       123        60
OIR    2025250     91400   18.9100 -113.3200       7.4       168       120        60
OIR    2025250     91400   18.9100 -113.3300       7.5       169       117        60
OIR    2025250     91400   18.9100 -113.3400       7.5       169       117        60
OIR    2025250     91400   18.9100 -113.3500       7.7       169       119        60
OIR    2025250     91400   18.9100 -113.3600       7.8       169       119        60
OIR    2025250     91400   18.9100 -113.3700       7.9       170       116        60
OIR    2025250     91400   18.9100 -113.3800       8.1       170       116        60
OIR    2025250     91400   18.9100 -113.3900       8.3       170       116        60
OIR    2025250     91400   18.9100 -113.4000       8.4       171       116        60
OIR    2025250     91400   18.9100 -113.4100       8.5       171       116        60
OIR    2025250     91400   18.9100 -113.4200       8.7       172       116        60
OIR    2025250     91400   18.9100 -113.4300       8.8       172       117        60
OIR    2025250     91400   18.9100 -113.4400       8.9       172       117        60
OIR    2025250     91400   18.9100 -113.4500       9.0       173       117        60
OIR    2025250     91400   18.9100 -113.4600       9.2       173       117        60
OIR    2025250     91400   18.9100 -113.4700       9.3       173       116        60
OIR    2025250     91400   18.9100 -113.4800       9.3       174       116        60
OIR    2025250     91400   18.9100 -113.4900       9.4       174       115        60
OIR    2025250     91400   18.9100 -113.5000       9.4       174       114        60
OIR    2025250     91400   18.9100 -113.5100       9.5       174       114        60
OIR    2025250     91400   18.9100 -113.5200       9.5       174       114        60
OIR    2025250     91400   18.9100 -113.5300       9.5       174       115        60
OIR    2025250     91400   18.9100 -113.5400       9.6       174       116        60
OIR    2025250     91400   18.9100 -113.5500       9.6       175       116        60
OIR    2025250     91400   18.9100 -113.5600       9.6       175       116        60
OIR    2025250     91400   18.9100 -113.5700       9.6       175       116        60
OIR    2025250     91400   18.9100 -113.5800       9.6       175       116        60
OIR    2025250     91400   18.9100 -113.5900       9.7       175       116        60
OIR    2025250     91400   18.9100 -113.6000       9.7       175       116        60
OIR    2025250     91400   18.9100 -113.6100       9.7       175       116        60
OIR    2025250     91400   18.9100 -113.6200       9.8       176       116        60
OIR    2025250     91400   18.9100 -113.6300       9.8       176       116        60
OIR    2025250     91400   18.9100 -113.6400       9.9       176       116        60
OIR    2025250     91400   18.9100 -113.6500      10.0       177       116        60
OIR    2025250     91400   18.9100 -113.6600      10.1       178       116        60
OIR    2025250     91400   18.9100 -113.6700      10.2       178       116        60
OIR    2025250     91400   18.9100 -113.6800      10.3       179       116        60
OIR    2025250     91400   18.9100 -113.6900      10.4       180       116        60
OIR    2025250     91400   18.9100 -113.7000      10.5       181       116        60
OIR    2025250     91400   18.9100 -113.7100      10.6       182       119        60
OIR    2025250     91400   18.9100 -113.7200      10.6       183       121        60
OIR    2025250     91400   18.9100 -113.7300      10.7       183       121        60
OIR    2025250     91400   18.9100 -113.7400      10.7       184       121        60
OIR    2025250     91400   18.9100 -113.7500      10.8       184       121        60
OIR    2025250     91400   18.9100 -113.7600      10.9       184       122        60
OIR    2025250     91400   18.9100 -113.7700      11.0       185       123        60
OIR    2025250     91400   18.9100 -113.7800      11.1       185       123        60
OIR    2025250     91400   18.9100 -113.7900      11.3       186       123        60
OIR    2025250     91400   18.9100 -113.8000      11.4       186       122        60
OIR    2025250     91400   18.9100 -113.8100      11.4       187       121        60
OIR    2025250     91400   18.9100 -113.8200      11.4       187       121        60
OIR    2025250     91400   18.9100 -113.8300      11.4       187       122        60
OIR    2025250     91400   18.9100 -113.8400      11.4       188       123        60
OIR    2025250     91400   18.9100 -113.8500      11.4       188       123        60
OIR    2025250     91400   18.9100 -113.8600      11.4       188       123        60
OIR    2025250     91400   18.9100 -113.8700      11.4       188       121        60
OIR    2025250     91400   18.9100 -113.8800      11.4       188       117        60
OIR    2025250     91400   18.9100 -113.8900      11.4       188       120        60
OIR    2025250     91400   18.9100 -113.9000      11.4       188       122        60
OIR    2025250     91400   18.9100 -113.9100      11.4       189       123        60
OIR    2025250     91400   18.9100 -113.9200      11.4       189       123        60
OIR    2025250     91400   18.9100 -113.9300      11.4       189       122        60
OIR    2025250     91400   18.9100 -113.9400      11.4       189       121        60
OIR    2025250     91400   18.9100 -113.9500      11.4       189       121        60
OIR    2025250     91400   18.9100 -113.9600      11.4       189       121        60
OIR    2025250     91400   18.9100 -113.9700      11.4       190       122        60
OIR    2025250     91400   18.9100 -113.9800      11.4       190       123        60
OIR    2025250     91400   18.9100 -113.9900      11.5       190       123        60
OIR    2025250     91400   18.9100 -114.0000      11.5       190       124        60
OIR    2025250     91400   18.9100 -114.0100      11.5       190       125        60
OIR    2025250     91400   18.9100 -114.0200      11.5       190       125        60
OIR    2025250     91400   18.9100 -114.0300      11.6       191       127        60
OIR    2025250     91400   18.9100 -114.0400      11.6       191       128        60
OIR    2025250     91400   18.9100 -114.0500      11.6       191       129        60
OIR    2025250     91400   18.9100 -114.0600      11.6       191       130        60
OIR    2025250     91400   18.9100 -114.0700      11.6       191       132        60
OIR    2025250     91400   18.9100 -114.0800      11.6       191       133        60
OIR    2025250     91400   18.9100 -114.0900      11.7       191       135        60
OIR    2025250     91400   18.9100 -114.1000      11.7       191       137        60
OIR    2025250     91400   18.9100 -114.1100      11.7       191       139        60
OIR    2025250     91400   18.9100 -114.1200      11.7       191       141        60
OIR    2025250     91400   18.9100 -114.5600      14.0       199       138        60
OIR    2025250     91400   18.9100 -114.5700      14.0       199       137        60
OIR    2025250     91400   18.9100 -114.5800      14.0       199       140        60
OIR    2025250     91400   18.9000 -111.3300      12.5        80       137        60
OIR    2025250     91400   18.9000 -111.3400      13.0        87       131        60
OIR    2025250     91400   18.9000 -111.3500      13.5        91       125        60
OIR    2025250     91400   18.9000 -111.3600      14.0        95       123        60
OIR    2025250     91400   18.9000 -111.3700      14.1        95       122        60
OIR    2025250     91400   18.9000 -111.3800      14.1        96       123        60
OIR    2025250     91400   18.9000 -111.3900      14.1        96       126        60
OIR    2025250     91400   18.9000 -111.4000      14.1        96       128        60
OIR    2025250     91400   18.9000 -111.4100      14.1        96       125        60
OIR    2025250     91400   18.9000 -111.4200      14.1        96       121        60
OIR    2025250     91400   18.9000 -111.4300      14.1        96       121        60
OIR    2025250     91400   18.9000 -111.4400      14.1        96       122        60
OIR    2025250     91400   18.9000 -111.4500      13.9        97       122        60
OIR    2025250     91400   18.9000 -111.4600      13.7       101       122        60
OIR    2025250     91400   18.9000 -111.4700      13.6       104       123        60
OIR    2025250     91400   18.9000 -111.4800      13.5       105       122        60
OIR    2025250     91400   18.9000 -111.4900      13.5       105       122        60
OIR    2025250     91400   18.9000 -111.5000      13.4       105       120        60
OIR    2025250     91400   18.9000 -111.5100      13.4       105       116        60
OIR    2025250     91400   18.9000 -111.5200      13.4       105       116        60
OIR    2025250     91400   18.9000 -111.5300      13.4       105       116        60
OIR    2025250     91400   18.9000 -111.5400      13.4       105       116        60
OIR    2025250     91400   18.9000 -111.5500      13.4       105       115        60
OIR    2025250     91400   18.9000 -111.5600      13.4       104       114        60
OIR    2025250     91400   18.9000 -111.5700      13.4       104       111        60
OIR    2025250     91400   18.9000 -111.5800      13.4       104       109        60
OIR    2025250     91400   18.9000 -111.5900      13.4       104       108        60
OIR    2025250     91400   18.9000 -111.6000      13.4       104       112        60
OIR    2025250     91400   18.9000 -111.6100      13.4       104       115        60
OIR    2025250     91400   18.9000 -111.6200      13.4       103       117        60
OIR    2025250     91400   18.9000 -111.6300      13.3       101       122        60
OIR    2025250     91400   18.9000 -111.6400      12.6        94       126        60
OIR    2025250     91400   18.9000 -111.6500      12.5        92       129        60
OIR    2025250     91400   18.9000 -111.6600      12.5        91       132        60
OIR    2025250     91400   18.9000 -111.6700      12.2        87       134        60
OIR    2025250     91400   18.9000 -111.6800      11.9        83       136        60
OIR    2025250     91400   18.9000 -111.6900      11.8        83       140        60
OIR    2025250     91400   18.9000 -112.9900       6.7       144       142        60
OIR    2025250     91400   18.9000 -113.0000       6.9       146       142        60
OIR    2025250     91400   18.9000 -113.0100       7.0       148       141        60
OIR    2025250     91400   18.9000 -113.0700       7.1       149       141        60
OIR    2025250     91400   18.9000 -113.0800       7.1       148       139        60
OIR    2025250     91400   18.9000 -113.0900       7.1       148       140        60
OIR    2025250     91400   18.9000 -113.1000       7.1       148       142        60
OIR    2025250     91400   18.9000 -113.1100       7.1       148       142        60
OIR    2025250     91400   18.9000 -113.1300       7.0       148       142        60
OIR    2025250     91400   18.9000 -113.1400       7.0       148       140        60
OIR    2025250     91400   18.9000 -113.1500       7.0       148       138        60
OIR    2025250     91400   18.9000 -113.1600       7.0       148       138        60
OIR    2025250     91400   18.9000 -113.1700       7.0       148       139        60
OIR    2025250     91400   18.9000 -113.1800       6.9       148       136        60
OIR    2025250     91400   18.9000 -113.1900       6.9       149       133        60
OIR    2025250     91400   18.9000 -113.2000       6.9       150       132        60
OIR    2025250     91400   18.9000 -113.2100       6.9       150       131        60
OIR    2025250     91400   18.9000 -113.2200       6.8       151       130        60
OIR    2025250     91400   18.9000 -113.2300       6.8       151       131        60
OIR    2025250     91400   18.9000 -113.2400       6.8       152       131        60
OIR    2025250     91400   18.9000 -113.2500       6.8       153       129        60
OIR    2025250     91400   18.9000 -113.2600       6.8       155       126        60
OIR    2025250     91400   18.9000 -113.2700       6.8       157       125        60
OIR    2025250     91400   18.9000 -113.2800       6.8       159       126        60
OIR    2025250     91400   18.9000 -113.2900       6.9       160       126        60
OIR    2025250     91400   18.9000 -113.3000       7.0       161       124        60
OIR    2025250     91400   18.9000 -113.3100       7.1       163       123        60
OIR    2025250     91400   18.9000 -113.3200       7.3       165       121        60
OIR    2025250     91400   18.9000 -113.3300       7.4       167       119        60
OIR    2025250     91400   18.9000 -113.3400       7.5       168       117        60
OIR    2025250     91400   18.9000 -113.3500       7.6       168       119        60
OIR    2025250     91400   18.9000 -113.3600       7.7       168       117        60
OIR    2025250     91400   18.9000 -113.3700       7.8       168       117        60
OIR    2025250     91400   18.9000 -113.3800       8.0       169       116        60
OIR    2025250     91400   18.9000 -113.3900       8.2       169       116        60
OIR    2025250     91400   18.9000 -113.4000       8.3       170       116        60
OIR    2025250     91400   18.9000 -113.4100       8.4       170       116        60
OIR    2025250     91400   18.9000 -113.4200       8.6       171       117        60
OIR    2025250     91400   18.9000 -113.4300       8.7       171       119        60
OIR    2025250     91400   18.9000 -113.4400       8.8       171       119        60
OIR    2025250     91400   18.9000 -113.4500       9.0       172       120        60
OIR    2025250     91400   18.9000 -113.4600       9.1       173       119        60
OIR    2025250     91400   18.9000 -113.4700       9.3       173       117        60
OIR    2025250     91400   18.9000 -113.4800       9.3       173       116        60
OIR    2025250     91400   18.9000 -113.4900       9.4       174       115        60
OIR    2025250     91400   18.9000 -113.5000       9.4       174       115        60
OIR    2025250     91400   18.9000 -113.5100       9.5       174       116        60
OIR    2025250     91400   18.9000 -113.5200       9.5       174       116        60
OIR    2025250     91400   18.9000 -113.5300       9.5       174       116        60
OIR    2025250     91400   18.9000 -113.5400       9.6       174       117        60
OIR    2025250     91400   18.9000 -113.5500       9.6       174       117        60
OIR    2025250     91400   18.9000 -113.5600       9.6       175       117        60
OIR    2025250     91400   18.9000 -113.5700       9.6       175       116        60
OIR    2025250     91400   18.9000 -113.5800       9.6       175       116        60
OIR    2025250     91400   18.9000 -113.5900       9.7       175       117        60
OIR    2025250     91400   18.9000 -113.6000       9.7       175       117        60
OIR    2025250     91400   18.9000 -113.6100       9.7       175       117        60
OIR    2025250     91400   18.9000 -113.6200       9.8       176       117        60
OIR    2025250     91400   18.9000 -113.6300       9.9       176       116        60
OIR    2025250     91400   18.9000 -113.6400      10.0       177       116        60
OIR    2025250     91400   18.9000 -113.6500      10.2       177       116        60
OIR    2025250     91400   18.9000 -113.6600      10.3       178       117        60
OIR    2025250     91400   18.9000 -113.6700      10.4       179       117        60
OIR    2025250     91400   18.9000 -113.6800      10.5       180       117        60
OIR    2025250     91400   18.9000 -113.6900      10.5       180       117        60
OIR    2025250     91400   18.9000 -113.7000      10.6       181       116        60
OIR    2025250     91400   18.9000 -113.7100      10.6       182       116        60
OIR    2025250     91400   18.9000 -113.7200      10.7       183       117        60
OIR    2025250     91400   18.9000 -113.7300      10.8       183       117        60
OIR    2025250     91400   18.9000 -113.7400      10.8       184       119        60
OIR    2025250     91400   18.9000 -113.7500      10.9       184       120        60
OIR    2025250     91400   18.9000 -113.7600      11.0       185       122        60
OIR    2025250     91400   18.9000 -113.7700      11.1       185       123        60
OIR    2025250     91400   18.9000 -113.7800      11.3       186       123        60
OIR    2025250     91400   18.9000 -113.7900      11.4       186       123        60
OIR    2025250     91400   18.9000 -113.8000      11.4       186       122        60
OIR    2025250     91400   18.9000 -113.8100      11.5       187       121        60
OIR    2025250     91400   18.9000 -113.8200      11.5       187       121        60
OIR    2025250     91400   18.9000 -113.8300      11.5       187       122        60
OIR    2025250     91400   18.9000 -113.8400      11.5       188       123        60
OIR    2025250     91400   18.9000 -113.8500      11.5       188       123        60
OIR    2025250     91400   18.9000 -113.8600      11.5       188       123        60
OIR    2025250     91400   18.9000 -113.8700      11.5       188       122        60
OIR    2025250     91400   18.9000 -113.8800      11.5       188       121        60
OIR    2025250     91400   18.9000 -113.8900      11.5       188       121        60
OIR    2025250     91400   18.9000 -113.9000      11.5       188       122        60
OIR    2025250     91400   18.9000 -113.9100      11.5       189       122        60
OIR    2025250     91400   18.9000 -113.9200      11.5       189       122        60
OIR    2025250     91400   18.9000 -113.9300      11.5       189       121        60
OIR    2025250     91400   18.9000 -113.9400      11.5       189       121        60
OIR    2025250     91400   18.9000 -113.9500      11.5       189       121        60
OIR    2025250     91400   18.9000 -113.9600      11.5       189       122        60
OIR    2025250     91400   18.9000 -113.9700      11.5       190       123        60
OIR    2025250     91400   18.9000 -113.9800      11.5       190       124        60
OIR    2025250     91400   18.9000 -113.9900      11.5       190       124        60
OIR    2025250     91400   18.9000 -114.0000      11.5       190       125        60
OIR    2025250     91400   18.9000 -114.0100      11.5       190       126        60
OIR    2025250     91400   18.9000 -114.0200      11.6       190       127        60
OIR    2025250     91400   18.9000 -114.0300      11.6       191       127        60
OIR    2025250     91400   18.9000 -114.0400      11.6       191       128        60
OIR    2025250     91400   18.9000 -114.0500      11.6       191       129        60
OIR    2025250     91400   18.9000 -114.0600      11.6       191       130        60
OIR    2025250     91400   18.9000 -114.0700      11.7       191       132        60
OIR    2025250     91400   18.9000 -114.0800      11.7       191       134        60
OIR    2025250     91400   18.9000 -114.0900      11.7       191       137        60
OIR    2025250     91400   18.9000 -114.1000      11.7       191       139        60
OIR    2025250     91400   18.9000 -114.1100      11.7       191       141        60
OIR    2025250     91400   18.9000 -114.5700      14.0       199       140        60
OIR    2025250     91400   18.9000 -114.5800      14.0       199       139        60
OIR    2025250     91400   18.9000 -114.5900      13.9       199       140        60
OIR    2025250     91400   18.8900 -111.3300      13.1        81       137        60
OIR    2025250     91400   18.8900 -111.3400      13.4        85       132        60
OIR    2025250     91400   18.8900 -111.3500      13.7        91       127        60
OIR    2025250     91400   18.8900 -111.3600      14.0        94       124        60
OIR    2025250     91400   18.8900 -111.3700      14.1        95       122        60
OIR    2025250     91400   18.8900 -111.3800      14.1        95       121        60
OIR    2025250     91400   18.8900 -111.3900      14.1        95       123        60
OIR    2025250     91400   18.8900 -111.4000      14.1        95       124        60
OIR    2025250     91400   18.8900 -111.4100      14.1        95       125        60
OIR    2025250     91400   18.8900 -111.4200      14.1        95       125        60
OIR    2025250     91400   18.8900 -111.4300      14.1        95       124        60
OIR    2025250     91400   18.8900 -111.4400      14.1        96       122        60
OIR    2025250     91400   18.8900 -111.4500      14.1        96       121        60
OIR    2025250     91400   18.8900 -111.4600      13.9        98       120        60
OIR    2025250     91400   18.8900 -111.4700      13.7       102       119        60
OIR    2025250     91400   18.8900 -111.4800      13.5       104       122        60
OIR    2025250     91400   18.8900 -111.4900      13.4       104       125        60
OIR    2025250     91400   18.8900 -111.5000      13.4       105       124        60
OIR    2025250     91400   18.8900 -111.5100      13.4       105       121        60
OIR    2025250     91400   18.8900 -111.5200      13.4       105       117        60
OIR    2025250     91400   18.8900 -111.5300      13.4       105       117        60
OIR    2025250     91400   18.8900 -111.5400      13.4       105       119        60
OIR    2025250     91400   18.8900 -111.5500      13.4       104       117        60
OIR    2025250     91400   18.8900 -111.5600      13.4       104       116        60
OIR    2025250     91400   18.8900 -111.5700      13.4       104       116        60
OIR    2025250     91400   18.8900 -111.5800      13.4       104       115        60
OIR    2025250     91400   18.8900 -111.5900      13.4       104       114        60
OIR    2025250     91400   18.8900 -111.6000      13.4       104       116        60
OIR    2025250     91400   18.8900 -111.6100      13.4       104       117        60
OIR    2025250     91400   18.8900 -111.6200      13.4       103       122        60
OIR    2025250     91400   18.8900 -111.6300      12.7        97       125        60
OIR    2025250     91400   18.8900 -111.6400      12.3        92       128        60
OIR    2025250     91400   18.8900 -111.6500      12.4        91       130        60
OIR    2025250     91400   18.8900 -111.6600      12.2        88       131        60
OIR    2025250     91400   18.8900 -111.6700      12.0        84       132        60
OIR    2025250     91400   18.8900 -111.6800      11.9        82       133        60
OIR    2025250     91400   18.8900 -111.6900      11.7        82       137        60
OIR    2025250     91400   18.8900 -111.7000      11.7        82       140        60
OIR    2025250     91400   18.8900 -112.9900       6.6       138       142        60
OIR    2025250     91400   18.8900 -113.0000       6.9       142       142        60
OIR    2025250     91400   18.8900 -113.0100       7.0       145       142        60
OIR    2025250     91400   18.8900 -113.0800       7.1       148       140        60
OIR    2025250     91400   18.8900 -113.0900       7.1       148       140        60
OIR    2025250     91400   18.8900 -113.1000       7.1       148       140        60
OIR    2025250     91400   18.8900 -113.1100       7.1       147       140        60
OIR    2025250     91400   18.8900 -113.1200       7.1       147       140        60
OIR    2025250     91400   18.8900 -113.1300       7.0       147       140        60
OIR    2025250     91400   18.8900 -113.1400       7.0       147       139        60
OIR    2025250     91400   18.8900 -113.1500       7.0       147       138        60
OIR    2025250     91400   18.8900 -113.1600       7.0       147       140        60
OIR    2025250     91400   18.8900 -113.1700       7.0       148       141        60
OIR    2025250     91400   18.8900 -113.1800       6.9       148       140        60
OIR    2025250     91400   18.8900 -113.1900       6.9       148       135        60
OIR    2025250     91400   18.8900 -113.2000       6.9       149       132        60
OIR    2025250     91400   18.8900 -113.2100       6.9       150       131        60
OIR    2025250     91400   18.8900 -113.2200       6.8       150       131        60
OIR    2025250     91400   18.8900 -113.2300       6.8       151       132        60
OIR    2025250     91400   18.8900 -113.2400       6.8       151       135        60
OIR    2025250     91400   18.8900 -113.2500       6.8       152       134        60
OIR    2025250     91400   18.8900 -113.2600       6.8       154       128        60
OIR    2025250     91400   18.8900 -113.2700       6.8       156       125        60
OIR    2025250     91400   18.8900 -113.2800       6.8       158       124        60
OIR    2025250     91400   18.8900 -113.2900       6.9       158       123        60
OIR    2025250     91400   18.8900 -113.3000       6.9       159       122        60
OIR    2025250     91400   18.8900 -113.3100       7.0       160       120        60
OIR    2025250     91400   18.8900 -113.3200       7.0       161       120        60
OIR    2025250     91400   18.8900 -113.3300       7.1       163       119        60
OIR    2025250     91400   18.8900 -113.3400       7.3       165       119        60
OIR    2025250     91400   18.8900 -113.3500       7.4       166       119        60
OIR    2025250     91400   18.8900 -113.3600       7.6       166       117        60
OIR    2025250     91400   18.8900 -113.3700       7.7       167       117        60
OIR    2025250     91400   18.8900 -113.3800       7.9       167       116        60
OIR    2025250     91400   18.8900 -113.3900       8.1       168       116        60
OIR    2025250     91400   18.8900 -113.4000       8.2       169       116        60
OIR    2025250     91400   18.8900 -113.4100       8.4       169       116        60
OIR    2025250     91400   18.8900 -113.4200       8.5       170       117        60
OIR    2025250     91400   18.8900 -113.4300       8.6       170       119        60
OIR    2025250     91400   18.8900 -113.4400       8.8       171       119        60
OIR    2025250     91400   18.8900 -113.4500       8.9       171       119        60
OIR    2025250     91400   18.8900 -113.4600       9.1       172       119        60
OIR    2025250     91400   18.8900 -113.4700       9.2       172       119        60
OIR    2025250     91400   18.8900 -113.4800       9.3       173       117        60
OIR    2025250     91400   18.8900 -113.4900       9.4       173       116        60
OIR    2025250     91400   18.8900 -113.5000       9.4       174       116        60
OIR    2025250     91400   18.8900 -113.5100       9.4       174       116        60
OIR    2025250     91400   18.8900 -113.5200       9.5       174       117        60
OIR    2025250     91400   18.8900 -113.5300       9.5       174       119        60
OIR    2025250     91400   18.8900 -113.5400       9.6       174       120        60
OIR    2025250     91400   18.8900 -113.5500       9.6       174       120        60
OIR    2025250     91400   18.8900 -113.5600       9.6       174       119        60
OIR    2025250     91400   18.8900 -113.5700       9.6       175       120        60
OIR    2025250     91400   18.8900 -113.5800       9.7       175       121        60
OIR    2025250     91400   18.8900 -113.5900       9.7       175       121        60
OIR    2025250     91400   18.8900 -113.6000       9.7       175       119        60
OIR    2025250     91400   18.8900 -113.6100       9.8       176       117        60
OIR    2025250     91400   18.8900 -113.6200       9.9       176       117        60
OIR    2025250     91400   18.8900 -113.6300      10.1       177       117        60
OIR    2025250     91400   18.8900 -113.6400      10.3       177       116        60
OIR    2025250     91400   18.8900 -113.6500      10.4       178       116        60
OIR    2025250     91400   18.8900 -113.6600      10.5       178       117        60
OIR    2025250     91400   18.8900 -113.6700      10.5       179       119        60
OIR    2025250     91400   18.8900 -113.6800      10.6       180       120        60
OIR    2025250     91400   18.8900 -113.6900      10.6       180       119        60
OIR    2025250     91400   18.8900 -113.7000      10.7       181       117        60
OIR    2025250     91400   18.8900 -113.7100      10.7       182       117        60
OIR    2025250     91400   18.8900 -113.7200      10.8       183       116        60
OIR    2025250     91400   18.8900 -113.7300      10.9       184       117        60
OIR    2025250     91400   18.8900 -113.7400      11.0       184       119        60
OIR    2025250     91400   18.8900 -113.7500      11.1       185       119        60
OIR    2025250     91400   18.8900 -113.7600      11.2       185       121        60
OIR    2025250     91400   18.8900 -113.7700      11.3       186       123        60
OIR    2025250     91400   18.8900 -113.7800      11.4       186       123        60
OIR    2025250     91400   18.8900 -113.7900      11.5       186       123        60
OIR    2025250     91400   18.8900 -113.8000      11.5       187       122        60
OIR    2025250     91400   18.8900 -113.8100      11.5       187       121        60
OIR    2025250     91400   18.8900 -113.8200      11.5       187       121        60
OIR    2025250     91400   18.8900 -113.8300      11.5       187       122        60
OIR    2025250     91400   18.8900 -113.8400      11.5       188       123        60
OIR    2025250     91400   18.8900 -113.8500      11.5       188       123        60
OIR    2025250     91400   18.8900 -113.8600      11.5       188       122        60
OIR    2025250     91400   18.8900 -113.8700      11.5       188       122        60
OIR    2025250     91400   18.8900 -113.8800      11.5       188       122        60
OIR    2025250     91400   18.8900 -113.8900      11.5       188       122        60
OIR    2025250     91400   18.8900 -113.9000      11.5       188       123        60
OIR    2025250     91400   18.8900 -113.9100      11.5       189       123        60
OIR    2025250     91400   18.8900 -113.9200      11.5       189       121        60
OIR    2025250     91400   18.8900 -113.9300      11.5       189       120        60
OIR    2025250     91400   18.8900 -113.9400      11.5       189       120        60
OIR    2025250     91400   18.8900 -113.9500      11.5       189       120        60
OIR    2025250     91400   18.8900 -113.9600      11.5       190       122        60
OIR    2025250     91400   18.8900 -113.9700      11.5       190       123        60
OIR    2025250     91400   18.8900 -113.9800      11.5       190       125        60
OIR    2025250     91400   18.8900 -113.9900      11.5       190       125        60
OIR    2025250     91400   18.8900 -114.0000      11.5       190       126        60
OIR    2025250     91400   18.8900 -114.0100      11.5       190       127        60
OIR    2025250     91400   18.8900 -114.0200      11.6       191       128        60
OIR    2025250     91400   18.8900 -114.0300      11.6       191       129        60
OIR    2025250     91400   18.8900 -114.0400      11.6       191       129        60
OIR    2025250     91400   18.8900 -114.0500      11.6       191       130        60
OIR    2025250     91400   18.8900 -114.0600      11.7       191       131        60
OIR    2025250     91400   18.8900 -114.0700      11.7       191       132        60
OIR    2025250     91400   18.8900 -114.0800      11.7       191       136        60
OIR    2025250     91400   18.8900 -114.0900      11.7       191       139        60
OIR    2025250     91400   18.8900 -114.1000      11.7       191       141        60
OIR    2025250     91400   18.8900 -114.5800      13.9       199       141        60
OIR    2025250     91400   18.8900 -114.5900      13.9       199       136        60
OIR    2025250     91400   18.8800 -111.3300      13.8        82       139        60
OIR    2025250     91400   18.8800 -111.3400      13.8        86       135        60
OIR    2025250     91400   18.8800 -111.3500      14.1        90       130        60
OIR    2025250     91400   18.8800 -111.3600      14.2        93       126        60
OIR    2025250     91400   18.8800 -111.3700      14.2        95       123        60
OIR    2025250     91400   18.8800 -111.3800      14.1        95       121        60
OIR    2025250     91400   18.8800 -111.3900      14.1        95       121        60
OIR    2025250     91400   18.8800 -111.4000      14.1        95       122        60
OIR    2025250     91400   18.8800 -111.4100      14.1        95       123        60
OIR    2025250     91400   18.8800 -111.4200      14.1        95       125        60
OIR    2025250     91400   18.8800 -111.4300      14.1        95       126        60
OIR    2025250     91400   18.8800 -111.4400      14.2        95       123        60
OIR    2025250     91400   18.8800 -111.4500      14.2        96       121        60
OIR    2025250     91400   18.8800 -111.4600      14.1        97       119        60
OIR    2025250     91400   18.8800 -111.4700      13.9        99       117        60
OIR    2025250     91400   18.8800 -111.4800      13.6       102       121        60
OIR    2025250     91400   18.8800 -111.4900      13.5       104       125        60
OIR    2025250     91400   18.8800 -111.5000      13.4       104       129        60
OIR    2025250     91400   18.8800 -111.5100      13.4       105       125        60
OIR    2025250     91400   18.8800 -111.5200      13.4       105       121        60
OIR    2025250     91400   18.8800 -111.5300      13.4       105       121        60
OIR    2025250     91400   18.8800 -111.5400      13.4       104       121        60
OIR    2025250     91400   18.8800 -111.5500      13.4       104       120        60
OIR    2025250     91400   18.8800 -111.5600      13.4       104       120        60
OIR    2025250     91400   18.8800 -111.5700      13.4       104       120        60
OIR    2025250     91400   18.8800 -111.5800      13.4       104       120        60
OIR    2025250     91400   18.8800 -111.5900      13.4       104       120        60
OIR    2025250     91400   18.8800 -111.6000      13.4       104       121        60
OIR    2025250     91400   18.8800 -111.6100      13.4       104       123        60
OIR    2025250     91400   18.8800 -111.6200      13.5       103       125        60
OIR    2025250     91400   18.8800 -111.6300      12.7        95       128        60
OIR    2025250     91400   18.8800 -111.6400      12.3        88       131        60
OIR    2025250     91400   18.8800 -111.6500      11.9        84       131        60
OIR    2025250     91400   18.8800 -111.6600      11.7        77       130        60
OIR    2025250     91400   18.8800 -111.6700      11.9        75       130        60
OIR    2025250     91400   18.8800 -111.6800      12.0        74       131        60
OIR    2025250     91400   18.8800 -111.6900      11.3        76       133        60
OIR    2025250     91400   18.8800 -111.7000      11.3        74       136        60
OIR    2025250     91400   18.8800 -111.7100      11.1        73       139        60
OIR    2025250     91400   18.8800 -111.7200      11.1        74       141        60
OIR    2025250     91400   18.8800 -113.0000       6.9       137       142        60
OIR    2025250     91400   18.8800 -113.0100       7.1       141       142        60
OIR    2025250     91400   18.8800 -113.1500       7.0       147       139        60
OIR    2025250     91400   18.8800 -113.1600       7.0       147       138        60
OIR    2025250     91400   18.8800 -113.1700       7.0       147       138        60
OIR    2025250     91400   18.8800 -113.1800       7.0       148       138        60
OIR    2025250     91400   18.8800 -113.1900       6.9       148       138        60
OIR    2025250     91400   18.8800 -113.2000       6.9       148       138        60
OIR    2025250     91400   18.8800 -113.2100       6.9       149       135        60
OIR    2025250     91400   18.8800 -113.2200       6.9       150       132        60
OIR    2025250     91400   18.8800 -113.2300       6.8       150       133        60
OIR    2025250     91400   18.8800 -113.2400       6.8       151       136        60
OIR    2025250     91400   18.8800 -113.2500       6.8       152       136        60
OIR    2025250     91400   18.8800 -113.2600       6.8       153       130        60
OIR    2025250     91400   18.8800 -113.2700       6.8       155       125        60
OIR    2025250     91400   18.8800 -113.2800       6.8       157       124        60
OIR    2025250     91400   18.8800 -113.2900       6.9       157       123        60
OIR    2025250     91400   18.8800 -113.3000       6.9       158       122        60
OIR    2025250     91400   18.8800 -113.3100       6.9       158       122        60
OIR    2025250     91400   18.8800 -113.3200       6.9       158       121        60
OIR    2025250     91400   18.8800 -113.3300       6.9       159       121        60
OIR    2025250     91400   18.8800 -113.3400       7.0       161       121        60
OIR    2025250     91400   18.8800 -113.3500       7.2       162       120        60
OIR    2025250     91400   18.8800 -113.3600       7.4       164       119        60
OIR    2025250     91400   18.8800 -113.3700       7.6       165       119        60
OIR    2025250     91400   18.8800 -113.3800       7.7       165       117        60
OIR    2025250     91400   18.8800 -113.3900       7.8       165       117        60
OIR    2025250     91400   18.8800 -113.4000       8.0       166       119        60
OIR    2025250     91400   18.8800 -113.4100       8.2       168       119        60
OIR    2025250     91400   18.8800 -113.4200       8.4       169       119        60
OIR    2025250     91400   18.8800 -113.4300       8.6       170       119        60
OIR    2025250     91400   18.8800 -113.4400       8.7       170       120        60
OIR    2025250     91400   18.8800 -113.4500       8.9       170       121        60
OIR    2025250     91400   18.8800 -113.4600       9.1       171       121        60
OIR    2025250     91400   18.8800 -113.4700       9.2       172       120        60
OIR    2025250     91400   18.8800 -113.4800       9.3       172       119        60
OIR    2025250     91400   18.8800 -113.4900       9.4       173       117        60
OIR    2025250     91400   18.8800 -113.5000       9.4       173       116        60
OIR    2025250     91400   18.8800 -113.5100       9.4       173       119        60
OIR    2025250     91400   18.8800 -113.5200       9.5       174       121        60
OIR    2025250     91400   18.8800 -113.5300       9.6       174       121        60
OIR    2025250     91400   18.8800 -113.5400       9.6       174       121        60
OIR    2025250     91400   18.8800 -113.5500       9.6       174       122        60
OIR    2025250     91400   18.8800 -113.5600       9.6       174       121        60
OIR    2025250     91400   18.8800 -113.5700       9.6       174       121        60
OIR    2025250     91400   18.8800 -113.5800       9.7       175       124        60
OIR    2025250     91400   18.8800 -113.5900       9.7       175       126        60
OIR    2025250     91400   18.8800 -113.6000       9.8       175       122        60
OIR    2025250     91400   18.8800 -113.6100       9.9       176       117        60
OIR    2025250     91400   18.8800 -113.6200      10.1       177       116        60
OIR    2025250     91400   18.8800 -113.6300      10.3       177       117        60
OIR    2025250     91400   18.8800 -113.6400      10.4       178       117        60
OIR    2025250     91400   18.8800 -113.6500      10.5       178       117        60
OIR    2025250     91400   18.8800 -113.6600      10.5       179       117        60
OIR    2025250     91400   18.8800 -113.6700      10.6       179       117        60
OIR    2025250     91400   18.8800 -113.6800      10.6       180       119        60
OIR    2025250     91400   18.8800 -113.6900      10.7       180       119        60
OIR    2025250     91400   18.8800 -113.7000      10.8       181       117        60
OIR    2025250     91400   18.8800 -113.7100      10.9       182       117        60
OIR    2025250     91400   18.8800 -113.7200      11.0       183       120        60
OIR    2025250     91400   18.8800 -113.7300      11.1       184       121        60
OIR    2025250     91400   18.8800 -113.7400      11.1       184       121        60
OIR    2025250     91400   18.8800 -113.7500      11.2       185       121        60
OIR    2025250     91400   18.8800 -113.7600      11.4       185       122        60
OIR    2025250     91400   18.8800 -113.7700      11.5       186       123        60
OIR    2025250     91400   18.8800 -113.7800      11.6       186       123        60
OIR    2025250     91400   18.8800 -113.7900      11.6       186       122        60
OIR    2025250     91400   18.8800 -113.8000      11.6       187       122        60
OIR    2025250     91400   18.8800 -113.8100      11.6       187       121        60
OIR    2025250     91400   18.8800 -113.8200      11.6       187       121        60
OIR    2025250     91400   18.8800 -113.8300      11.6       187       122        60
OIR    2025250     91400   18.8800 -113.8400      11.6       188       123        60
OIR    2025250     91400   18.8800 -113.8500      11.6       188       123        60
OIR    2025250     91400   18.8800 -113.8600      11.6       188       123        60
OIR    2025250     91400   18.8800 -113.8700      11.6       188       122        60
OIR    2025250     91400   18.8800 -113.8800      11.6       188       123        60
OIR    2025250     91400   18.8800 -113.8900      11.6       188       123        60
OIR    2025250     91400   18.8800 -113.9000      11.6       188       123        60
OIR    2025250     91400   18.8800 -113.9100      11.5       189       123        60
OIR    2025250     91400   18.8800 -113.9200      11.5       189       122        60
OIR    2025250     91400   18.8800 -113.9300      11.5       189       121        60
OIR    2025250     91400   18.8800 -113.9400      11.5       189       120        60
OIR    2025250     91400   18.8800 -113.9500      11.5       189       120        60
OIR    2025250     91400   18.8800 -113.9600      11.5       190       122        60
OIR    2025250     91400   18.8800 -113.9700      11.5       190       124        60
OIR    2025250     91400   18.8800 -113.9800      11.5       190       125        60
OIR    2025250     91400   18.8800 -113.9900      11.5       190       126        60
OIR    2025250     91400   18.8800 -114.0000      11.5       190       127        60
OIR    2025250     91400   18.8800 -114.0100      11.5       190       128        60
OIR    2025250     91400   18.8800 -114.0200      11.6       191       129        60
OIR    2025250     91400   18.8800 -114.0300      11.6       191       130        60
OIR    2025250     91400   18.8800 -114.0400      11.6       191       130        60
OIR    2025250     91400   18.8800 -114.0500      11.6       191       131        60
OIR    2025250     91400   18.8800 -114.0600      11.6       191       132        60
OIR    2025250     91400   18.8800 -114.0700      11.7       191       134        60
OIR    2025250     91400   18.8800 -114.0800      11.7       191       137        60
OIR    2025250     91400   18.8800 -114.0900      11.7       191       141        60
OIR    2025250     91400   18.8800 -114.1800      11.6       190       141        60
OIR    2025250     91400   18.8700 -109.9700      49.1       248       125        60
OIR    2025250     91400   18.8700 -109.9800      48.3       136       122        60
OIR    2025250     91400   18.8700 -110.3900      13.5        57       142        60
OIR    2025250     91400   18.8700 -110.4000      14.0        57       141        60
OIR    2025250     91400   18.8700 -110.4100      14.7        56       141        60
OIR    2025250     91400   18.8700 -110.4200      15.0        56       141        60
OIR    2025250     91400   18.8700 -110.4300      14.6        56       142        60
OIR    2025250     91400   18.8700 -111.3400      14.2        88       138        60
OIR    2025250     91400   18.8700 -111.3500      14.5        91       135        60
OIR    2025250     91400   18.8700 -111.3600      14.5        93       131        60
OIR    2025250     91400   18.8700 -111.3700      14.4        94       126        60
OIR    2025250     91400   18.8700 -111.3800      14.2        95       122        60
OIR    2025250     91400   18.8700 -111.3900      14.2        95       122        60
OIR    2025250     91400   18.8700 -111.4000      14.2        95       122        60
OIR    2025250     91400   18.8700 -111.4100      14.2        95       122        60
OIR    2025250     91400   18.8700 -111.4200      14.2        95       122        60
OIR    2025250     91400   18.8700 -111.4300      14.2        95       122        60
OIR    2025250     91400   18.8700 -111.4400      14.2        95       122        60
OIR    2025250     91400   18.8700 -111.4500      14.2        95       122        60
OIR    2025250     91400   18.8700 -111.4600      14.2        95       122        60
OIR    2025250     91400   18.8700 -111.4700      14.1        97       121        60
OIR    2025250     91400   18.8700 -111.4800      13.8        99       122        60
OIR    2025250     91400   18.8700 -111.4900      13.6       102       124        60
OIR    2025250     91400   18.8700 -111.5000      13.4       104       126        60
OIR    2025250     91400   18.8700 -111.5100      13.4       104       126        60
OIR    2025250     91400   18.8700 -111.5200      13.4       104       125        60
OIR    2025250     91400   18.8700 -111.5300      13.4       104       124        60
OIR    2025250     91400   18.8700 -111.5400      13.4       104       123        60
OIR    2025250     91400   18.8700 -111.5500      13.4       104       123        60
OIR    2025250     91400   18.8700 -111.5600      13.4       104       123        60
OIR    2025250     91400   18.8700 -111.5700      13.4       104       123        60
OIR    2025250     91400   18.8700 -111.5800      13.4       104       123        60
OIR    2025250     91400   18.8700 -111.5900      13.4       104       123        60
OIR    2025250     91400   18.8700 -111.6000      13.4       104       124        60
OIR    2025250     91400   18.8700 -111.6100      13.5       103       126        60
OIR    2025250     91400   18.8700 -111.6200      13.4       100       128        60
OIR    2025250     91400   18.8700 -111.6300      12.9        89       130        60
OIR    2025250     91400   18.8700 -111.6400      12.1        76       131        60
OIR    2025250     91400   18.8700 -111.6500      11.6        66       131        60
OIR    2025250     91400   18.8700 -111.6600      11.9        61       130        60
OIR    2025250     91400   18.8700 -111.6700      12.2        60       129        60
OIR    2025250     91400   18.8700 -111.6800      12.2        62       129        60
OIR    2025250     91400   18.8700 -111.6900      11.2        68       130        60
OIR    2025250     91400   18.8700 -111.7000      11.1        67       133        60
OIR    2025250     91400   18.8700 -111.7100      11.4        66       137        60
OIR    2025250     91400   18.8700 -111.7200      11.1        67       138        60
OIR    2025250     91400   18.8700 -111.7300      11.4        70       139        60
OIR    2025250     91400   18.8700 -111.7400      11.5        73       142        60
OIR    2025250     91400   18.8700 -113.1500       7.1       145       142        60
OIR    2025250     91400   18.8700 -113.1600       7.0       146       137        60
OIR    2025250     91400   18.8700 -113.1700       7.0       147       135        60
OIR    2025250     91400   18.8700 -113.1800       7.0       147       134        60
OIR    2025250     91400   18.8700 -113.1900       7.0       148       139        60
OIR    2025250     91400   18.8700 -113.2100       6.9       148       139        60
OIR    2025250     91400   18.8700 -113.2200       6.9       149       133        60
OIR    2025250     91400   18.8700 -113.2300       6.9       150       133        60
OIR    2025250     91400   18.8700 -113.2400       6.8       151       136        60
OIR    2025250     91400   18.8700 -113.2500       6.8       151       139        60
OIR    2025250     91400   18.8700 -113.2600       6.8       153       133        60
OIR    2025250     91400   18.8700 -113.2700       6.8       155       126        60
OIR    2025250     91400   18.8700 -113.2800       6.8       156       124        60
OIR    2025250     91400   18.8700 -113.2900       6.9       157       123        60
OIR    2025250     91400   18.8700 -113.3000       6.9       157       124        60
OIR    2025250     91400   18.8700 -113.3100       6.9       157       126        60
OIR    2025250     91400   18.8700 -113.3200       6.9       158       126        60
OIR    2025250     91400   18.8700 -113.3300       6.9       158       125        60
OIR    2025250     91400   18.8700 -113.3400       7.0       158       124        60
OIR    2025250     91400   18.8700 -113.3500       7.0       159       123        60
OIR    2025250     91400   18.8700 -113.3600       7.2       161       121        60
OIR    2025250     91400   18.8700 -113.3700       7.4       162       120        60
OIR    2025250     91400   18.8700 -113.3800       7.6       163       119        60
OIR    2025250     91400   18.8700 -113.3900       7.7       164       120        60
OIR    2025250     91400   18.8700 -113.4000       7.8       164       122        60
OIR    2025250     91400   18.8700 -113.4100       8.0       166       123        60
OIR    2025250     91400   18.8700 -113.4200       8.2       167       121        60
OIR    2025250     91400   18.8700 -113.4300       8.4       169       119        60
OIR    2025250     91400   18.8700 -113.4400       8.7       169       121        60
OIR    2025250     91400   18.8700 -113.4500       8.9       170       125        60
OIR    2025250     91400   18.8700 -113.4600       9.1       170       126        60
OIR    2025250     91400   18.8700 -113.4700       9.2       171       123        60
OIR    2025250     91400   18.8700 -113.4800       9.3       172       121        60
OIR    2025250     91400   18.8700 -113.4900       9.4       172       120        60
OIR    2025250     91400   18.8700 -113.5000       9.4       173       120        60
OIR    2025250     91400   18.8700 -113.5100       9.5       173       120        60
OIR    2025250     91400   18.8700 -113.5200       9.5       173       121        60
OIR    2025250     91400   18.8700 -113.5300       9.6       173       122        60
OIR    2025250     91400   18.8700 -113.5400       9.6       174       122        60
OIR    2025250     91400   18.8700 -113.5500       9.6       174       122        60
OIR    2025250     91400   18.8700 -113.5600       9.6       174       121        60
OIR    2025250     91400   18.8700 -113.5700       9.7       174       121        60
OIR    2025250     91400   18.8700 -113.5800       9.7       174       122        60
OIR    2025250     91400   18.8700 -113.5900       9.8       175       124        60
OIR    2025250     91400   18.8700 -113.6000       9.9       176       123        60
OIR    2025250     91400   18.8700 -113.6100      10.1       176       119        60
OIR    2025250     91400   18.8700 -113.6200      10.3       177       117        60
OIR    2025250     91400   18.8700 -113.6300      10.4       178       117        60
OIR    2025250     91400   18.8700 -113.6400      10.5       178       117        60
OIR    2025250     91400   18.8700 -113.6500      10.5       178       119        60
OIR    2025250     91400   18.8700 -113.6600      10.6       179       119        60
OIR    2025250     91400   18.8700 -113.6700      10.6       179       119        60
OIR    2025250     91400   18.8700 -113.6800      10.7       180       119        60
OIR    2025250     91400   18.8700 -113.6900      10.8       181       119        60
OIR    2025250     91400   18.8700 -113.7000      10.9       181       119        60
OIR    2025250     91400   18.8700 -113.7100      11.0       182       119        60
OIR    2025250     91400   18.8700 -113.7200      11.1       183       120        60
OIR    2025250     91400   18.8700 -113.7300      11.2       184       122        60
OIR    2025250     91400   18.8700 -113.7400      11.3       184       122        60
OIR    2025250     91400   18.8700 -113.7500      11.4       185       123        60
OIR    2025250     91400   18.8700 -113.7600      11.5       185       123        60
OIR    2025250     91400   18.8700 -113.7700      11.6       186       123        60
OIR    2025250     91400   18.8700 -113.7800      11.7       186       123        60
OIR    2025250     91400   18.8700 -113.7900      11.7       186       122        60
OIR    2025250     91400   18.8700 -113.8000      11.7       187       121        60
OIR    2025250     91400   18.8700 -113.8100      11.7       187       121        60
OIR    2025250     91400   18.8700 -113.8200      11.7       187       122        60
OIR    2025250     91400   18.8700 -113.8300      11.7       187       122        60
OIR    2025250     91400   18.8700 -113.8400      11.7       188       123        60
OIR    2025250     91400   18.8700 -113.8500      11.7       188       123        60
OIR    2025250     91400   18.8700 -113.8600      11.6       188       123        60
OIR    2025250     91400   18.8700 -113.8700      11.6       188       123        60
OIR    2025250     91400   18.8700 -113.8800      11.6       188       123        60
OIR    2025250     91400   18.8700 -113.8900      11.6       188       123        60
OIR    2025250     91400   18.8700 -113.9000      11.6       188       123        60
OIR    2025250     91400   18.8700 -113.9100      11.6       189       123        60
OIR    2025250     91400   18.8700 -113.9200      11.6       189       122        60
OIR    2025250     91400   18.8700 -113.9300      11.6       189       122        60
OIR    2025250     91400   18.8700 -113.9400      11.6       189       121        60
OIR    2025250     91400   18.8700 -113.9500      11.6       189       121        60
OIR    2025250     91400   18.8700 -113.9600      11.5       190       121        60
OIR    2025250     91400   18.8700 -113.9700      11.5       190       123        60
OIR    2025250     91400   18.8700 -113.9800      11.5       190       126        60
OIR    2025250     91400   18.8700 -113.9900      11.5       190       126        60
OIR    2025250     91400   18.8700 -114.0000      11.5       190       126        60
OIR    2025250     91400   18.8700 -114.0100      11.5       190       128        60
OIR    2025250     91400   18.8700 -114.0200      11.6       191       130        60
OIR    2025250     91400   18.8700 -114.0300      11.6       191       131        60
OIR    2025250     91400   18.8700 -114.0400      11.6       191       132        60
OIR    2025250     91400   18.8700 -114.0500      11.6       191       133        60
OIR    2025250     91400   18.8700 -114.0600      11.6       191       135        60
OIR    2025250     91400   18.8700 -114.0700      11.7       191       137        60
OIR    2025250     91400   18.8700 -114.0800      11.7       191       139        60
OIR    2025250     91400   18.8700 -114.1200      11.7       191       141        60
OIR    2025250     91400   18.8700 -114.1300      11.7       191       141        60
OIR    2025250     91400   18.8700 -114.1400      11.7       191       140        60
OIR    2025250     91400   18.8600 -110.3900      13.4        56       141        60
OIR    2025250     91400   18.8600 -110.4000      13.8        56       138        60
OIR    2025250     91400   18.8600 -110.4100      14.3        56       137        60
OIR    2025250     91400   18.8600 -110.4200      14.5        56       138        60
OIR    2025250     91400   18.8600 -110.4300      14.4        56       140        60
OIR    2025250     91400   18.8600 -111.3400      15.1        88       141        60
OIR    2025250     91400   18.8600 -111.3500      15.1        91       137        60
OIR    2025250     91400   18.8600 -111.3600      15.0        92       133        60
OIR    2025250     91400   18.8600 -111.3700      14.6        93       129        60
OIR    2025250     91400   18.8600 -111.3800      14.4        94       125        60
OIR    2025250     91400   18.8600 -111.3900      14.3        95       124        60
OIR    2025250     91400   18.8600 -111.4000      14.3        95       123        60
OIR    2025250     91400   18.8600 -111.4100      14.3        95       123        60
OIR    2025250     91400   18.8600 -111.4200      14.3        95       121        60
OIR    2025250     91400   18.8600 -111.4300      14.3        95       120        60
OIR    2025250     91400   18.8600 -111.4400      14.3        95       121        60
OIR    2025250     91400   18.8600 -111.4500      14.3        95       122        60
OIR    2025250     91400   18.8600 -111.4600      14.2        95       123        60
OIR    2025250     91400   18.8600 -111.4700      14.2        95       123        60
OIR    2025250     91400   18.8600 -111.4800      14.0        97       123        60
OIR    2025250     91400   18.8600 -111.4900      13.8        99       124        60
OIR    2025250     91400   18.8600 -111.5000      13.5       102       125        60
OIR    2025250     91400   18.8600 -111.5100      13.4       104       126        60
OIR    2025250     91400   18.8600 -111.5200      13.4       104       127        60
OIR    2025250     91400   18.8600 -111.5300      13.4       104       128        60
OIR    2025250     91400   18.8600 -111.5400      13.4       104       126        60
OIR    2025250     91400   18.8600 -111.5500      13.4       104       125        60
OIR    2025250     91400   18.8600 -111.5600      13.4       104       125        60
OIR    2025250     91400   18.8600 -111.5700      13.4       104       125        60
OIR    2025250     91400   18.8600 -111.5800      13.4       104       125        60
OIR    2025250     91400   18.8600 -111.5900      13.4       104       125        60
OIR    2025250     91400   18.8600 -111.6000      13.4       103       126        60
OIR    2025250     91400   18.8600 -111.6100      13.3       100       129        60
OIR    2025250     91400   18.8600 -111.6200      12.8        93       132        60
OIR    2025250     91400   18.8600 -111.6300      12.3        78       132        60
OIR    2025250     91400   18.8600 -111.6400      11.9        64       131        60
OIR    2025250     91400   18.8600 -111.6500      12.0        60       130        60
OIR    2025250     91400   18.8600 -111.6600      12.1        59       129        60
OIR    2025250     91400   18.8600 -111.6700      12.2        59       128        60
OIR    2025250     91400   18.8600 -111.6800      12.2        59       128        60
OIR    2025250     91400   18.8600 -111.6900      12.2        59       128        60
OIR    2025250     91400   18.8600 -111.7000      11.7        60       133        60
OIR    2025250     91400   18.8600 -111.7100      11.7        63       137        60
OIR    2025250     91400   18.8600 -111.7200      11.4        63       138        60
OIR    2025250     91400   18.8600 -111.7300      11.6        65       139        60
OIR    2025250     91400   18.8600 -111.7400      11.7        68       139        60
OIR    2025250     91400   18.8600 -111.7500      11.5        71       142        60
OIR    2025250     91400   18.8600 -113.1700       7.1       146       139        60
OIR    2025250     91400   18.8600 -113.1800       7.0       147       134        60
OIR    2025250     91400   18.8600 -113.1900       7.0       147       135        60
OIR    2025250     91400   18.8600 -113.2000       7.0       148       137        60
OIR    2025250     91400   18.8600 -113.2100       7.0       148       138        60
OIR    2025250     91400   18.8600 -113.2200       6.9       148       136        60
OIR    2025250     91400   18.8600 -113.2300       6.9       149       135        60
OIR    2025250     91400   18.8600 -113.2400       6.9       150       135        60
OIR    2025250     91400   18.8600 -113.2500       6.8       151       136        60
OIR    2025250     91400   18.8600 -113.2600       6.8       152       132        60
OIR    2025250     91400   18.8600 -113.2700       6.8       154       128        60
OIR    2025250     91400   18.8600 -113.2800       6.9       156       127        60
OIR    2025250     91400   18.8600 -113.2900       6.9       157       127        60
OIR    2025250     91400   18.8600 -113.3000       6.9       157       127        60
OIR    2025250     91400   18.8600 -113.3100       6.9       157       128        60
OIR    2025250     91400   18.8600 -113.3200       6.9       157       129        60
OIR    2025250     91400   18.8600 -113.3300       6.9       158       127        60
OIR    2025250     91400   18.8600 -113.3400       6.9       158       125        60
OIR    2025250     91400   18.8600 -113.3500       7.0       158       124        60
OIR    2025250     91400   18.8600 -113.3600       7.0       159       123        60
OIR    2025250     91400   18.8600 -113.3700       7.2       160       121        60
OIR    2025250     91400   18.8600 -113.3800       7.3       161       120        60
OIR    2025250     91400   18.8600 -113.3900       7.5       162       119        60
OIR    2025250     91400   18.8600 -113.4000       7.6       163       122        60
OIR    2025250     91400   18.8600 -113.4100       7.8       164       124        60
OIR    2025250     91400   18.8600 -113.4200       8.0       165       122        60
OIR    2025250     91400   18.8600 -113.4300       8.3       167       119        60
OIR    2025250     91400   18.8600 -113.4400       8.6       168       122        60
OIR    2025250     91400   18.8600 -113.4500       8.9       169       128        60
OIR    2025250     91400   18.8600 -113.4600       9.1       170       132        60
OIR    2025250     91400   18.8600 -113.4700       9.2       171       128        60
OIR    2025250     91400   18.8600 -113.4800       9.3       171       123        60
OIR    2025250     91400   18.8600 -113.4900       9.4       172       123        60
OIR    2025250     91400   18.8600 -113.5000       9.4       172       123        60
OIR    2025250     91400   18.8600 -113.5100       9.5       173       122        60
OIR    2025250     91400   18.8600 -113.5200       9.5       173       122        60
OIR    2025250     91400   18.8600 -113.5300       9.6       173       122        60
OIR    2025250     91400   18.8600 -113.5400       9.6       173       123        60
OIR    2025250     91400   18.8600 -113.5500       9.6       173       122        60
OIR    2025250     91400   18.8600 -113.5600       9.7       174       121        60
OIR    2025250     91400   18.8600 -113.5700       9.7       174       120        60
OIR    2025250     91400   18.8600 -113.5800       9.7       174       120        60
OIR    2025250     91400   18.8600 -113.5900       9.8       175       120        60
OIR    2025250     91400   18.8600 -113.6000      10.0       176       120        60
OIR    2025250     91400   18.8600 -113.6100      10.2       176       120        60
OIR    2025250     91400   18.8600 -113.6200      10.3       177       119        60
OIR    2025250     91400   18.8600 -113.6300      10.5       178       117        60
OIR    2025250     91400   18.8600 -113.6400      10.5       178       116        60
OIR    2025250     91400   18.8600 -113.6500      10.6       178       119        60
OIR    2025250     91400   18.8600 -113.6600      10.6       179       121        60
OIR    2025250     91400   18.8600 -113.6700      10.6       179       121        60
OIR    2025250     91400   18.8600 -113.6800      10.7       180       120        60
OIR    2025250     91400   18.8600 -113.6900      10.9       181       120        60
OIR    2025250     91400   18.8600 -113.7000      11.0       182       120        60
OIR    2025250     91400   18.8600 -113.7100      11.2       182       120        60
OIR    2025250     91400   18.8600 -113.7200      11.3       183       120        60
OIR    2025250     91400   18.8600 -113.7300      11.4       184       120        60
OIR    2025250     91400   18.8600 -113.7400      11.5       184       122        60
OIR    2025250     91400   18.8600 -113.7500      11.6       185       124        60
OIR    2025250     91400   18.8600 -113.7600      11.7       185       124        60
OIR    2025250     91400   18.8600 -113.7700      11.8       186       124        60
OIR    2025250     91400   18.8600 -113.7800      11.8       186       123        60
OIR    2025250     91400   18.8600 -113.7900      11.8       187       123        60
OIR    2025250     91400   18.8600 -113.8000      11.8       187       122        60
OIR    2025250     91400   18.8600 -113.8100      11.8       187       122        60
OIR    2025250     91400   18.8600 -113.8200      11.9       187       122        60
OIR    2025250     91400   18.8600 -113.8300      11.8       187       122        60
OIR    2025250     91400   18.8600 -113.8400      11.8       188       123        60
OIR    2025250     91400   18.8600 -113.8500      11.8       188       123        60
OIR    2025250     91400   18.8600 -113.8600      11.7       188       122        60
OIR    2025250     91400   18.8600 -113.8700      11.7       188       122        60
OIR    2025250     91400   18.8600 -113.8800      11.7       188       122        60
OIR    2025250     91400   18.8600 -113.8900      11.7       188       123        60
OIR    2025250     91400   18.8600 -113.9000      11.6       188       123        60
OIR    2025250     91400   18.8600 -113.9100      11.6       189       123        60
OIR    2025250     91400   18.8600 -113.9200      11.6       189       123        60
OIR    2025250     91400   18.8600 -113.9300      11.6       189       122        60
OIR    2025250     91400   18.8600 -113.9400      11.6       189       122        60
OIR    2025250     91400   18.8600 -113.9500      11.6       189       122        60
OIR    2025250     91400   18.8600 -113.9600      11.6       190       122        60
OIR    2025250     91400   18.8600 -113.9700      11.6       190       124        60
OIR    2025250     91400   18.8600 -113.9800      11.5       190       126        60
OIR    2025250     91400   18.8600 -113.9900      11.5       190       127        60
OIR    2025250     91400   18.8600 -114.0000      11.5       190       127        60
OIR    2025250     91400   18.8600 -114.0100      11.5       190       128        60
OIR    2025250     91400   18.8600 -114.0200      11.6       191       129        60
OIR    2025250     91400   18.8600 -114.0300      11.6       191       131        60
OIR    2025250     91400   18.8600 -114.0400      11.6       191       132        60
OIR    2025250     91400   18.8600 -114.0500      11.6       191       133        60
OIR    2025250     91400   18.8600 -114.0600      11.6       191       136        60
OIR    2025250     91400   18.8600 -114.0700      11.7       191       138        60
OIR    2025250     91400   18.8600 -114.0800      11.7       191       140        60
OIR    2025250     91400   18.8600 -114.1100      11.7       191       141        60
OIR    2025250     91400   18.8600 -114.1200      11.7       191       138        60
OIR    2025250     91400   18.8600 -114.1300      11.7       191       137        60
OIR    2025250     91400   18.8600 -114.1400      11.7       191       136        60
OIR    2025250     91400   18.8600 -114.1500      11.7       191       138        60
OIR    2025250     91400   18.8600 -114.1600      11.7       191       141        60
OIR    2025250     91400   18.8500 -110.3800      12.8        54       143        60
OIR    2025250     91400   18.8500 -110.3900      13.3        55       140        60
OIR    2025250     91400   18.8500 -110.4000      13.8        56       137        60
OIR    2025250     91400   18.8500 -110.4100      14.1        56       136        60
OIR    2025250     91400   18.8500 -110.4200      14.2        56       137        60
OIR    2025250     91400   18.8500 -110.4300      14.2        56       139        60
OIR    2025250     91400   18.8500 -110.4400      14.2        57       141        60
OIR    2025250     91400   18.8500 -111.3500      15.4        91       139        60
OIR    2025250     91400   18.8500 -111.3600      15.2        92       135        60
OIR    2025250     91400   18.8500 -111.3700      14.8        93       132        60
OIR    2025250     91400   18.8500 -111.3800      14.5        94       129        60
OIR    2025250     91400   18.8500 -111.3900      14.5        94       127        60
OIR    2025250     91400   18.8500 -111.4000      14.4        94       127        60
OIR    2025250     91400   18.8500 -111.4100      14.4        94       127        60
OIR    2025250     91400   18.8500 -111.4200      14.4        94       124        60
OIR    2025250     91400   18.8500 -111.4300      14.4        94       121        60
OIR    2025250     91400   18.8500 -111.4400      14.4        94       121        60
OIR    2025250     91400   18.8500 -111.4500      14.3        94       121        60
OIR    2025250     91400   18.8500 -111.4600      14.3        94       122        60
OIR    2025250     91400   18.8500 -111.4700      14.3        94       121        60
OIR    2025250     91400   18.8500 -111.4800      14.2        95       121        60
OIR    2025250     91400   18.8500 -111.4900      14.0        97       124        60
OIR    2025250     91400   18.8500 -111.5000      13.7        99       127        60
OIR    2025250     91400   18.8500 -111.5100      13.5       102       127        60
OIR    2025250     91400   18.8500 -111.5200      13.4       104       126        60
OIR    2025250     91400   18.8500 -111.5300      13.4       104       125        60
OIR    2025250     91400   18.8500 -111.5400      13.4       104       126        60
OIR    2025250     91400   18.8500 -111.5500      13.4       104       127        60
OIR    2025250     91400   18.8500 -111.5600      13.4       104       128        60
OIR    2025250     91400   18.8500 -111.5700      13.4       104       128        60
OIR    2025250     91400   18.8500 -111.5800      13.4       103       128        60
OIR    2025250     91400   18.8500 -111.5900      13.3       103       128        60
OIR    2025250     91400   18.8500 -111.6000      13.1        99       128        60
OIR    2025250     91400   18.8500 -111.6100      12.6        92       131        60
OIR    2025250     91400   18.8500 -111.6200      12.0        81       133        60
OIR    2025250     91400   18.8500 -111.6300      12.1        68       134        60
OIR    2025250     91400   18.8500 -111.6400      12.1        60       134        60
OIR    2025250     91400   18.8500 -111.6500      12.2        59       132        60
OIR    2025250     91400   18.8500 -111.6600      12.2        59       131        60
OIR    2025250     91400   18.8500 -111.6700      12.2        59       129        60
OIR    2025250     91400   18.8500 -111.6800      12.2        59       129        60
OIR    2025250     91400   18.8500 -111.6900      12.2        59       130        60
OIR    2025250     91400   18.8500 -111.7000      12.1        59       134        60
OIR    2025250     91400   18.8500 -111.7100      11.9        60       139        60
OIR    2025250     91400   18.8500 -111.7200      11.8        61       140        60
OIR    2025250     91400   18.8500 -111.7300      11.8        62       139        60
OIR    2025250     91400   18.8500 -111.7400      11.9        64       139        60
OIR    2025250     91400   18.8500 -111.7500      11.7        67       140        60
OIR    2025250     91400   18.8500 -113.1800       7.1       147       137        60
OIR    2025250     91400   18.8500 -113.1900       7.1       147       133        60
OIR    2025250     91400   18.8500 -113.2000       7.1       147       133        60
OIR    2025250     91400   18.8500 -113.2100       7.0       147       133        60
OIR    2025250     91400   18.8500 -113.2200       7.0       148       137        60
OIR    2025250     91400   18.8500 -113.2300       7.0       148       139        60
OIR    2025250     91400   18.8500 -113.2400       6.9       149       134        60
OIR    2025250     91400   18.8500 -113.2500       6.9       150       130        60
OIR    2025250     91400   18.8500 -113.2600       6.9       152       130        60
OIR    2025250     91400   18.8500 -113.2700       6.9       153       129        60
OIR    2025250     91400   18.8500 -113.2800       6.9       155       129        60
OIR    2025250     91400   18.8500 -113.2900       6.9       156       131        60
OIR    2025250     91400   18.8500 -113.3000       6.9       156       132        60
OIR    2025250     91400   18.8500 -113.3100       6.9       157       131        60
OIR    2025250     91400   18.8500 -113.3200       6.9       157       130        60
OIR    2025250     91400   18.8500 -113.3300       6.9       157       127        60
OIR    2025250     91400   18.8500 -113.3400       6.9       158       124        60
OIR    2025250     91400   18.8500 -113.3500       7.0       158       123        60
OIR    2025250     91400   18.8500 -113.3600       7.0       158       123        60
OIR    2025250     91400   18.8500 -113.3700       7.0       159       122        60
OIR    2025250     91400   18.8500 -113.3800       7.1       159       120        60
OIR    2025250     91400   18.8500 -113.3900       7.2       160       119        60
OIR    2025250     91400   18.8500 -113.4000       7.4       161       119        60
OIR    2025250     91400   18.8500 -113.4100       7.6       162       120        60
OIR    2025250     91400   18.8500 -113.4200       7.8       164       120        60
OIR    2025250     91400   18.8500 -113.4300       8.2       165       119        60
OIR    2025250     91400   18.8500 -113.4400       8.5       167       122        60
OIR    2025250     91400   18.8500 -113.4500       8.8       168       129        60
OIR    2025250     91400   18.8500 -113.4600       9.0       169       135        60
OIR    2025250     91400   18.8500 -113.4700       9.2       170       133        60
OIR    2025250     91400   18.8500 -113.4800       9.3       171       131        60
OIR    2025250     91400   18.8500 -113.4900       9.4       171       131        60
OIR    2025250     91400   18.8500 -113.5000       9.5       172       131        60
OIR    2025250     91400   18.8500 -113.5100       9.5       172       129        60
OIR    2025250     91400   18.8500 -113.5200       9.6       172       125        60
OIR    2025250     91400   18.8500 -113.5300       9.6       173       123        60
OIR    2025250     91400   18.8500 -113.5400       9.6       173       127        60
OIR    2025250     91400   18.8500 -113.5500       9.7       173       131        60
OIR    2025250     91400   18.8500 -113.5600       9.7       173       127        60
OIR    2025250     91400   18.8500 -113.5700       9.7       173       122        60
OIR    2025250     91400   18.8500 -113.5800       9.8       174       121        60
OIR    2025250     91400   18.8500 -113.5900       9.9       175       121        60
OIR    2025250     91400   18.8500 -113.6000      10.1       175       121        60
OIR    2025250     91400   18.8500 -113.6100      10.2       176       121        60
OIR    2025250     91400   18.8500 -113.6200      10.4       178       121        60
OIR    2025250     91400   18.8500 -113.6300      10.5       178       120        60
OIR    2025250     91400   18.8500 -113.6400      10.6       178       119        60
OIR    2025250     91400   18.8500 -113.6500      10.6       178       121        60
OIR    2025250     91400   18.8500 -113.6600      10.6       179       124        60
OIR    2025250     91400   18.8500 -113.6700      10.6       179       124        60
OIR    2025250     91400   18.8500 -113.6800      10.8       180       122        60
OIR    2025250     91400   18.8500 -113.6900      11.0       181       121        60
OIR    2025250     91400   18.8500 -113.7000      11.2       182       121        60
OIR    2025250     91400   18.8500 -113.7100      11.3       183       122        60
OIR    2025250     91400   18.8500 -113.7200      11.5       183       121        60
OIR    2025250     91400   18.8500 -113.7300      11.6       184       121        60
OIR    2025250     91400   18.8500 -113.7400      11.7       184       121        60
OIR    2025250     91400   18.8500 -113.7500      11.8       185       124        60
OIR    2025250     91400   18.8500 -113.7600      11.8       185       125        60
OIR    2025250     91400   18.8500 -113.7700      11.9       186       124        60
OIR    2025250     91400   18.8500 -113.7800      11.9       186       124        60
OIR    2025250     91400   18.8500 -113.7900      11.9       187       124        60
OIR    2025250     91400   18.8500 -113.8000      11.9       187       123        60
OIR    2025250     91400   18.8500 -113.8100      11.9       187       123        60
OIR    2025250     91400   18.8500 -113.8200      11.9       187       122        60
OIR    2025250     91400   18.8500 -113.8300      11.9       187       122        60
OIR    2025250     91400   18.8500 -113.8400      11.9       188       123        60
OIR    2025250     91400   18.8500 -113.8500      11.9       188       124        60
OIR    2025250     91400   18.8500 -113.8600      11.8       188       122        60
OIR    2025250     91400   18.8500 -113.8700      11.8       188       121        60
OIR    2025250     91400   18.8500 -113.8800      11.7       188       121        60
OIR    2025250     91400   18.8500 -113.8900      11.7       188       122        60
OIR    2025250     91400   18.8500 -113.9000      11.7       188       123        60
OIR    2025250     91400   18.8500 -113.9100      11.7       189       123        60
OIR    2025250     91400   18.8500 -113.9200      11.6       189       123        60
OIR    2025250     91400   18.8500 -113.9300      11.6       189       123        60
OIR    2025250     91400   18.8500 -113.9400      11.6       189       123        60
OIR    2025250     91400   18.8500 -113.9500      11.6       189       124        60
OIR    2025250     91400   18.8500 -113.9600      11.6       189       124        60
OIR    2025250     91400   18.8500 -113.9700      11.6       190       125        60
OIR    2025250     91400   18.8500 -113.9800      11.5       190       126        60
OIR    2025250     91400   18.8500 -113.9900      11.5       190       127        60
OIR    2025250     91400   18.8500 -114.0000      11.5       190       127        60
OIR    2025250     91400   18.8500 -114.0100      11.5       190       128        60
OIR    2025250     91400   18.8500 -114.0200      11.6       191       128        60
OIR    2025250     91400   18.8500 -114.0300      11.6       191       129        60
OIR    2025250     91400   18.8500 -114.0400      11.6       191       130        60
OIR    2025250     91400   18.8500 -114.0500      11.6       191       131        60
OIR    2025250     91400   18.8500 -114.0600      11.6       191       134        60
OIR    2025250     91400   18.8500 -114.0700      11.7       191       137        60
OIR    2025250     91400   18.8500 -114.0800      11.7       191       139        60
OIR    2025250     91400   18.8500 -114.0900      11.7       191       140        60
OIR    2025250     91400   18.8500 -114.1100      11.7       191       139        60
OIR    2025250     91400   18.8500 -114.1200      11.7       191       137        60
OIR    2025250     91400   18.8500 -114.1300      11.7       191       136        60
OIR    2025250     91400   18.8500 -114.1400      11.7       191       135        60
OIR    2025250     91400   18.8500 -114.1500      11.7       191       135        60
OIR    2025250     91400   18.8500 -114.1600      11.7       191       137        60
OIR    2025250     91400   18.8500 -114.1700      11.7       191       139        60
OIR    2025250     91400   18.8500 -114.1800      11.8       190       141        60
OIR    2025250     91400   18.8400 -110.3700      12.1        54       143        60
OIR    2025250     91400   18.8400 -110.3800      12.6        54       141        60
OIR    2025250     91400   18.8400 -110.3900      13.3        55       140        60
OIR    2025250     91400   18.8400 -110.4000      13.8        56       138        60
OIR    2025250     91400   18.8400 -110.4100      14.0        56       137        60
OIR    2025250     91400   18.8400 -110.4200      14.1        56       138        60
OIR    2025250     91400   18.8400 -110.4300      14.2        57       139        60
OIR    2025250     91400   18.8400 -110.4400      14.2        57       140        60
OIR    2025250     91400   18.8400 -111.3500      15.7        92       139        60
OIR    2025250     91400   18.8400 -111.3600      15.4        93       134        60
OIR    2025250     91400   18.8400 -111.3700      14.9        93       131        60
OIR    2025250     91400   18.8400 -111.3800      14.6        94       129        60
OIR    2025250     91400   18.8400 -111.3900      14.6        94       128        60
OIR    2025250     91400   18.8400 -111.4000      14.5        94       127        60
OIR    2025250     91400   18.8400 -111.4100      14.5        94       127        60
OIR    2025250     91400   18.8400 -111.4200      14.4        94       125        60
OIR    2025250     91400   18.8400 -111.4300      14.4        94       121        60
OIR    2025250     91400   18.8400 -111.4400      14.4        94       120        60
OIR    2025250     91400   18.8400 -111.4500      14.4        94       121        60
OIR    2025250     91400   18.8400 -111.4600      14.3        94       121        60
OIR    2025250     91400   18.8400 -111.4700      14.3        94       120        60
OIR    2025250     91400   18.8400 -111.4800      14.2        94       119        60
OIR    2025250     91400   18.8400 -111.4900      14.1        95       122        60
OIR    2025250     91400   18.8400 -111.5000      13.9        96       127        60
OIR    2025250     91400   18.8400 -111.5100      13.6        99       127        60
OIR    2025250     91400   18.8400 -111.5200      13.4       100       125        60
OIR    2025250     91400   18.8400 -111.5300      13.2       101       121        60
OIR    2025250     91400   18.8400 -111.5400      13.2       101       125        60
OIR    2025250     91400   18.8400 -111.5500      13.2       102       129        60
OIR    2025250     91400   18.8400 -111.5600      13.2       101       131        60
OIR    2025250     91400   18.8400 -111.5700      13.3       101       131        60
OIR    2025250     91400   18.8400 -111.5800      13.1       100       131        60
OIR    2025250     91400   18.8400 -111.5900      12.7        96       131        60
OIR    2025250     91400   18.8400 -111.6000      12.2        90       131        60
OIR    2025250     91400   18.8400 -111.6100      11.9        80       133        60
OIR    2025250     91400   18.8400 -111.6200      11.8        71       134        60
OIR    2025250     91400   18.8400 -111.6300      12.0        63       136        60
OIR    2025250     91400   18.8400 -111.6400      12.1        59       137        60
OIR    2025250     91400   18.8400 -111.6500      12.2        59       136        60
OIR    2025250     91400   18.8400 -111.6600      12.2        59       134        60
OIR    2025250     91400   18.8400 -111.6700      12.2        59       132        60
OIR    2025250     91400   18.8400 -111.6800      12.2        59       132        60
OIR    2025250     91400   18.8400 -111.6900      12.2        59       133        60
OIR    2025250     91400   18.8400 -111.7000      12.1        59       136        60
OIR    2025250     91400   18.8400 -111.7100      12.1        59       142        60
OIR    2025250     91400   18.8400 -111.7400      12.0        62       141        60
OIR    2025250     91400   18.8400 -111.7500      11.8        64       142        60
OIR    2025250     91400   18.8400 -113.1700       7.2       145       141        60
OIR    2025250     91400   18.8400 -113.1800       7.1       146       136        60
OIR    2025250     91400   18.8400 -113.1900       7.1       146       135        60
OIR    2025250     91400   18.8400 -113.2000       7.1       147       136        60
OIR    2025250     91400   18.8400 -113.2100       7.1       147       137        60
OIR    2025250     91400   18.8400 -113.2200       7.1       147       139        60
OIR    2025250     91400   18.8400 -113.2300       7.1       148       142        60
OIR    2025250     91400   18.8400 -113.2400       7.0       149       137        60
OIR    2025250     91400   18.8400 -113.2500       6.9       149       131        60
OIR    2025250     91400   18.8400 -113.2600       6.9       151       130        60
OIR    2025250     91400   18.8400 -113.2700       6.9       152       129        60
OIR    2025250     91400   18.8400 -113.2800       6.9       153       130        60
OIR    2025250     91400   18.8400 -113.2900       6.9       154       132        60
OIR    2025250     91400   18.8400 -113.3000       6.9       155       134        60
OIR    2025250     91400   18.8400 -113.3100       6.9       156       132        60
OIR    2025250     91400   18.8400 -113.3200       6.9       157       129        60
OIR    2025250     91400   18.8400 -113.3300       6.9       157       127        60
OIR    2025250     91400   18.8400 -113.3400       6.9       158       124        60
OIR    2025250     91400   18.8400 -113.3500       6.9       158       123        60
OIR    2025250     91400   18.8400 -113.3600       7.0       158       123        60
OIR    2025250     91400   18.8400 -113.3700       7.0       158       122        60
OIR    2025250     91400   18.8400 -113.3800       7.0       158       121        60
OIR    2025250     91400   18.8400 -113.3900       7.1       159       119        60
OIR    2025250     91400   18.8400 -113.4000       7.2       160       119        60
OIR    2025250     91400   18.8400 -113.4100       7.4       161       119        60
OIR    2025250     91400   18.8400 -113.4200       7.6       162       119        60
OIR    2025250     91400   18.8400 -113.4300       7.9       164       121        60
OIR    2025250     91400   18.8400 -113.4400       8.3       165       123        60
OIR    2025250     91400   18.8400 -113.4500       8.7       167       129        60
OIR    2025250     91400   18.8400 -113.4600       9.0       169       135        60
OIR    2025250     91400   18.8400 -113.4700       9.2       170       136        60
OIR    2025250     91400   18.8400 -113.4800       9.3       171       136        60
OIR    2025250     91400   18.8400 -113.4900       9.4       171       137        60
OIR    2025250     91400   18.8400 -113.5000       9.5       172       138        60
OIR    2025250     91400   18.8400 -113.5100       9.6       172       137        60
OIR    2025250     91400   18.8400 -113.5200       9.6       172       130        60
OIR    2025250     91400   18.8400 -113.5300       9.6       172       123        60
OIR    2025250     91400   18.8400 -113.5400       9.7       172       130        60
OIR    2025250     91400   18.8400 -113.5500       9.7       172       138        60
OIR    2025250     91400   18.8400 -113.5600       9.7       173       134        60
OIR    2025250     91400   18.8400 -113.5700       9.7       173       126        60
OIR    2025250     91400   18.8400 -113.5800       9.8       174       122        60
OIR    2025250     91400   18.8400 -113.5900       9.9       174       122        60
OIR    2025250     91400   18.8400 -113.6000      10.1       175       123        60
OIR    2025250     91400   18.8400 -113.6100      10.3       177       122        60
OIR    2025250     91400   18.8400 -113.6200      10.5       178       122        60
OIR    2025250     91400   18.8400 -113.6300      10.5       178       122        60
OIR    2025250     91400   18.8400 -113.6400      10.6       178       122        60
OIR    2025250     91400   18.8400 -113.6500      10.6       178       123        60
OIR    2025250     91400   18.8400 -113.6600      10.6       179       127        60
OIR    2025250     91400   18.8400 -113.6700      10.6       179       127        60
OIR    2025250     91400   18.8400 -113.6800      10.8       180       123        60
OIR    2025250     91400   18.8400 -113.6900      11.0       181       120        60
OIR    2025250     91400   18.8400 -113.7000      11.3       182       122        60
OIR    2025250     91400   18.8400 -113.7100      11.5       183       123        60
OIR    2025250     91400   18.8400 -113.7200      11.7       184       124        60
OIR    2025250     91400   18.8400 -113.7300      11.8       184       124        60
OIR    2025250     91400   18.8400 -113.7400      11.8       185       124        60
OIR    2025250     91400   18.8400 -113.7500      11.9       185       125        60
OIR    2025250     91400   18.8400 -113.7600      11.9       185       126        60
OIR    2025250     91400   18.8400 -113.7700      12.0       186       125        60
OIR    2025250     91400   18.8400 -113.7800      12.0       186       125        60
OIR    2025250     91400   18.8400 -113.7900      12.0       187       125        60
OIR    2025250     91400   18.8400 -113.8000      12.0       187       125        60
OIR    2025250     91400   18.8400 -113.8100      12.0       187       125        60
OIR    2025250     91400   18.8400 -113.8200      12.0       187       124        60
OIR    2025250     91400   18.8400 -113.8300      12.0       187       124        60
OIR    2025250     91400   18.8400 -113.8400      12.0       188       124        60
OIR    2025250     91400   18.8400 -113.8500      11.9       188       124        60
OIR    2025250     91400   18.8400 -113.8600      11.9       188       123        60
OIR    2025250     91400   18.8400 -113.8700      11.9       188       122        60
OIR    2025250     91400   18.8400 -113.8800      11.8       188       122        60
OIR    2025250     91400   18.8400 -113.8900      11.8       188       122        60
OIR    2025250     91400   18.8400 -113.9000      11.7       188       123        60
OIR    2025250     91400   18.8400 -113.9100      11.7       189       123        60
OIR    2025250     91400   18.8400 -113.9200      11.7       189       123        60
OIR    2025250     91400   18.8400 -113.9300      11.6       189       123        60
OIR    2025250     91400   18.8400 -113.9400      11.6       189       124        60
OIR    2025250     91400   18.8400 -113.9500      11.6       189       124        60
OIR    2025250     91400   18.8400 -113.9600      11.6       189       125        60
OIR    2025250     91400   18.8400 -113.9700      11.6       190       125        60
OIR    2025250     91400   18.8400 -113.9800      11.6       190       126        60
OIR    2025250     91400   18.8400 -113.9900      11.5       190       127        60
OIR    2025250     91400   18.8400 -114.0000      11.5       190       127        60
OIR    2025250     91400   18.8400 -114.0100      11.5       190       127        60
OIR    2025250     91400   18.8400 -114.0200      11.5       191       127        60
OIR    2025250     91400   18.8400 -114.0300      11.6       191       127        60
OIR    2025250     91400   18.8400 -114.0400      11.6       191       129        60
OIR    2025250     91400   18.8400 -114.0500      11.6       191       130        60
OIR    2025250     91400   18.8400 -114.0600      11.6       191       133        60
OIR    2025250     91400   18.8400 -114.0700      11.6       191       135        60
OIR    2025250     91400   18.8400 -114.0800      11.7       191       138        60
OIR    2025250     91400   18.8400 -114.0900      11.7       191       139        60
OIR    2025250     91400   18.8400 -114.1000      11.7       191       139        60
OIR    2025250     91400   18.8400 -114.1100      11.7       191       138        60
OIR    2025250     91400   18.8400 -114.1200      11.7       191       136        60
OIR    2025250     91400   18.8400 -114.1300      11.7       191       135        60
OIR    2025250     91400   18.8400 -114.1400      11.7       191       134        60
OIR    2025250     91400   18.8400 -114.1500      11.8       191       134        60
OIR    2025250     91400   18.8400 -114.1600      11.8       191       134        60
OIR    2025250     91400   18.8400 -114.1700      11.8       191       135        60
OIR    2025250     91400   18.8400 -114.1800      11.8       190       138        60
OIR    2025250     91400   18.8300 -110.0300      10.8       353       133        60
OIR    2025250     91400   18.8300 -110.3600      11.7        54       143        60
OIR    2025250     91400   18.8300 -110.3700      12.0        54       141        60
OIR    2025250     91400   18.8300 -110.3800      12.5        54       140        60
OIR    2025250     91400   18.8300 -110.3900      13.3        56       138        60
OIR    2025250     91400   18.8300 -110.4000      13.8        56       137        60
OIR    2025250     91400   18.8300 -110.4100      14.0        56       136        60
OIR    2025250     91400   18.8300 -110.4200      14.1        57       137        60
OIR    2025250     91400   18.8300 -110.4300      14.1        57       138        60
OIR    2025250     91400   18.8300 -110.4400      14.2        57       139        60
OIR    2025250     91400   18.8300 -110.4500      14.2        57       140        60
OIR    2025250     91400   18.8300 -110.4600      14.2        57       141        60
OIR    2025250     91400   18.8300 -110.4700      14.3        57       141        60
OIR    2025250     91400   18.8300 -110.4800      14.4        57       140        60
OIR    2025250     91400   18.8300 -110.4900      14.5        58       140        60
OIR    2025250     91400   18.8300 -110.5000      15.1        58       141        60
OIR    2025250     91400   18.8300 -110.5100      15.9        59       142        60
OIR    2025250     91400   18.8300 -111.3500      15.9        92       139        60
OIR    2025250     91400   18.8300 -111.3600      15.6        93       131        60
OIR    2025250     91400   18.8300 -111.3700      14.8        94       127        60
OIR    2025250     91400   18.8300 -111.3800      14.7        94       127        60
OIR    2025250     91400   18.8300 -111.3900      14.6        94       126        60
OIR    2025250     91400   18.8300 -111.4000      14.6        94       124        60
OIR    2025250     91400   18.8300 -111.4100      14.5        94       122        60
OIR    2025250     91400   18.8300 -111.4200      14.5        94       121        60
OIR    2025250     91400   18.8300 -111.4300      14.4        94       120        60
OIR    2025250     91400   18.8300 -111.4400      14.4        94       119        60
OIR    2025250     91400   18.8300 -111.4500      14.4        94       119        60
OIR    2025250     91400   18.8300 -111.4600      14.4        94       119        60
OIR    2025250     91400   18.8300 -111.4700      14.3        94       119        60
OIR    2025250     91400   18.8300 -111.4800      14.3        94       116        60
OIR    2025250     91400   18.8300 -111.4900      14.2        94       117        60
OIR    2025250     91400   18.8300 -111.5000      14.1        94       121        60
OIR    2025250     91400   18.8300 -111.5100      13.7        95       123        60
OIR    2025250     91400   18.8300 -111.5200      13.4        96       124        60
OIR    2025250     91400   18.8300 -111.5300      13.3        96       125        60
OIR    2025250     91400   18.8300 -111.5400      13.3        96       126        60
OIR    2025250     91400   18.8300 -111.5500      13.3        95       127        60
OIR    2025250     91400   18.8300 -111.5600      13.1        96       128        60
OIR    2025250     91400   18.8300 -111.5700      13.0        95       129        60
OIR    2025250     91400   18.8300 -111.5800      12.7        93       130        60
OIR    2025250     91400   18.8300 -111.5900      12.3        88       131        60
OIR    2025250     91400   18.8300 -111.6000      11.9        81       133        60
OIR    2025250     91400   18.8300 -111.6100      11.8        73       134        60
OIR    2025250     91400   18.8300 -111.6200      11.7        66       135        60
OIR    2025250     91400   18.8300 -111.6300      12.0        61       137        60
OIR    2025250     91400   18.8300 -111.6400      12.1        59       137        60
OIR    2025250     91400   18.8300 -111.6500      12.2        59       138        60
OIR    2025250     91400   18.8300 -111.6600      12.2        59       137        60
OIR    2025250     91400   18.8300 -111.6700      12.2        59       136        60
OIR    2025250     91400   18.8300 -111.6800      12.2        59       135        60
OIR    2025250     91400   18.8300 -111.6900      12.2        59       136        60
OIR    2025250     91400   18.8300 -111.7000      12.1        59       138        60
OIR    2025250     91400   18.8300 -113.1600       7.4       143       142        60
OIR    2025250     91400   18.8300 -113.1700       7.3       144       138        60
OIR    2025250     91400   18.8300 -113.1800       7.2       146       135        60
OIR    2025250     91400   18.8300 -113.1900       7.2       146       135        60
OIR    2025250     91400   18.8300 -113.2000       7.2       146       138        60
OIR    2025250     91400   18.8300 -113.2100       7.2       147       141        60
OIR    2025250     91400   18.8300 -113.2400       7.1       148       140        60
OIR    2025250     91400   18.8300 -113.2500       7.1       149       135        60
OIR    2025250     91400   18.8300 -113.2600       7.0       150       131        60
OIR    2025250     91400   18.8300 -113.2700       7.0       151       130        60
OIR    2025250     91400   18.8300 -113.2800       7.0       152       129        60
OIR    2025250     91400   18.8300 -113.2900       7.0       153       132        60
OIR    2025250     91400   18.8300 -113.3000       7.0       154       134        60
OIR    2025250     91400   18.8300 -113.3100       6.9       156       132        60
OIR    2025250     91400   18.8300 -113.3200       6.9       157       128        60
OIR    2025250     91400   18.8300 -113.3300       6.9       157       124        60
OIR    2025250     91400   18.8300 -113.3400       6.9       158       123        60
OIR    2025250     91400   18.8300 -113.3500       6.9       158       122        60
OIR    2025250     91400   18.8300 -113.3600       7.0       158       122        60
OIR    2025250     91400   18.8300 -113.3700       7.0       158       123        60
OIR    2025250     91400   18.8300 -113.3800       7.0       158       121        60
OIR    2025250     91400   18.8300 -113.3900       7.0       159       120        60
OIR    2025250     91400   18.8300 -113.4000       7.1       159       120        60
OIR    2025250     91400   18.8300 -113.4100       7.2       160       121        60
OIR    2025250     91400   18.8300 -113.4200       7.4       161       122        60
OIR    2025250     91400   18.8300 -113.4300       7.7       162       127        60
OIR    2025250     91400   18.8300 -113.4400       8.0       164       132        60
OIR    2025250     91400   18.8300 -113.4500       8.4       166       130        60
OIR    2025250     91400   18.8300 -113.4600       8.8       168       129        60
OIR    2025250     91400   18.8300 -113.4700       9.2       169       129        60
OIR    2025250     91400   18.8300 -113.4800       9.3       170       129        60
OIR    2025250     91400   18.8300 -113.4900       9.4       171       130        60
OIR    2025250     91400   18.8300 -113.5000       9.5       171       130        60
OIR    2025250     91400   18.8300 -113.5100       9.6       172       131        60
OIR    2025250     91400   18.8300 -113.5200       9.6       172       128        60
OIR    2025250     91400   18.8300 -113.5300       9.7       172       124        60
OIR    2025250     91400   18.8300 -113.5400       9.7       172       126        60
OIR    2025250     91400   18.8300 -113.5500       9.7       172       130        60
OIR    2025250     91400   18.8300 -113.5600       9.7       172       130        60
OIR    2025250     91400   18.8300 -113.5700       9.8       173       126        60
OIR    2025250     91400   18.8300 -113.5800       9.8       173       123        60
OIR    2025250     91400   18.8300 -113.5900      10.0       174       123        60
OIR    2025250     91400   18.8300 -113.6000      10.2       176       123        60
OIR    2025250     91400   18.8300 -113.6100      10.4       177       124        60
OIR    2025250     91400   18.8300 -113.6200      10.5       178       124        60
OIR    2025250     91400   18.8300 -113.6300      10.5       178       124        60
OIR    2025250     91400   18.8300 -113.6400      10.6       178       124        60
OIR    2025250     91400   18.8300 -113.6500      10.6       178       124        60
OIR    2025250     91400   18.8300 -113.6600      10.6       179       125        60
OIR    2025250     91400   18.8300 -113.6700      10.7       180       127        60
OIR    2025250     91400   18.8300 -113.6800      10.9       181       125        60
OIR    2025250     91400   18.8300 -113.6900      11.2       182       122        60
OIR    2025250     91400   18.8300 -113.7000      11.5       183       123        60
OIR    2025250     91400   18.8300 -113.7100      11.7       183       124        60
OIR    2025250     91400   18.8300 -113.7200      11.8       184       124        60
OIR    2025250     91400   18.8300 -113.7300      11.9       184       125        60
OIR    2025250     91400   18.8300 -113.7400      11.9       185       126        60
OIR    2025250     91400   18.8300 -113.7500      12.0       185       126        60
OIR    2025250     91400   18.8300 -113.7600      12.1       185       126        60
OIR    2025250     91400   18.8300 -113.7700      12.1       186       126        60
OIR    2025250     91400   18.8300 -113.7800      12.1       186       126        60
OIR    2025250     91400   18.8300 -113.7900      12.1       187       126        60
OIR    2025250     91400   18.8300 -113.8000      12.1       187       126        60
OIR    2025250     91400   18.8300 -113.8100      12.1       187       126        60
OIR    2025250     91400   18.8300 -113.8200      12.1       187       126        60
OIR    2025250     91400   18.8300 -113.8300      12.1       187       126        60
OIR    2025250     91400   18.8300 -113.8400      12.1       188       125        60
OIR    2025250     91400   18.8300 -113.8500      12.1       188       125        60
OIR    2025250     91400   18.8300 -113.8600      12.0       188       124        60
OIR    2025250     91400   18.8300 -113.8700      12.0       188       123        60
OIR    2025250     91400   18.8300 -113.8800      11.9       188       123        60
OIR    2025250     91400   18.8300 -113.8900      11.8       188       123        60
OIR    2025250     91400   18.8300 -113.9000      11.8       188       123        60
OIR    2025250     91400   18.8300 -113.9100      11.7       189       123        60
OIR    2025250     91400   18.8300 -113.9200      11.7       189       123        60
OIR    2025250     91400   18.8300 -113.9300      11.7       189       124        60
OIR    2025250     91400   18.8300 -113.9400      11.6       189       125        60
OIR    2025250     91400   18.8300 -113.9500      11.6       189       125        60
OIR    2025250     91400   18.8300 -113.9600      11.6       189       125        60
OIR    2025250     91400   18.8300 -113.9700      11.6       189       126        60
OIR    2025250     91400   18.8300 -113.9800      11.6       190       126        60
OIR    2025250     91400   18.8300 -113.9900      11.5       190       127        60
OIR    2025250     91400   18.8300 -114.0000      11.5       190       126        60
OIR    2025250     91400   18.8300 -114.0100      11.5       190       125        60
OIR    2025250     91400   18.8300 -114.0200      11.5       191       125        60
OIR    2025250     91400   18.8300 -114.0300      11.6       191       126        60
OIR    2025250     91400   18.8300 -114.0400      11.6       191       127        60
OIR    2025250     91400   18.8300 -114.0500      11.6       191       130        60
OIR    2025250     91400   18.8300 -114.0600      11.6       191       132        60
OIR    2025250     91400   18.8300 -114.0700      11.6       191       135        60
OIR    2025250     91400   18.8300 -114.0800      11.7       191       138        60
OIR    2025250     91400   18.8300 -114.0900      11.7       191       137        60
OIR    2025250     91400   18.8300 -114.1000      11.7       191       137        60
OIR    2025250     91400   18.8300 -114.1100      11.7       191       138        60
OIR    2025250     91400   18.8300 -114.1200      11.7       191       139        60
OIR    2025250     91400   18.8300 -114.1300      11.7       191       139        60
OIR    2025250     91400   18.8300 -114.1400      11.8       191       138        60
OIR    2025250     91400   18.8300 -114.1500      11.8       191       137        60
OIR    2025250     91400   18.8300 -114.1600      11.8       191       137        60
OIR    2025250     91400   18.8300 -114.1700      11.8       190       136        60
OIR    2025250     91400   18.8300 -114.1800      11.9       190       139        60
OIR    2025250     91400   18.8200 -110.3600      11.6        54       142        60
OIR    2025250     91400   18.8200 -110.3700      11.9        54       139        60
OIR    2025250     91400   18.8200 -110.3800      12.3        55       138        60
OIR    2025250     91400   18.8200 -110.3900      13.2        56       137        60
OIR    2025250     91400   18.8200 -110.4000      13.7        56       136        60
OIR    2025250     91400   18.8200 -110.4100      14.0        57       135        60
OIR    2025250     91400   18.8200 -110.4200      14.1        57       134        60
OIR    2025250     91400   18.8200 -110.4300      14.1        57       135        60
OIR    2025250     91400   18.8200 -110.4400      14.1        57       135        60
OIR    2025250     91400   18.8200 -110.4500      14.2        57       135        60
OIR    2025250     91400   18.8200 -110.4600      14.2        57       136        60
OIR    2025250     91400   18.8200 -110.4700      14.2        57       135        60
OIR    2025250     91400   18.8200 -110.4800      14.2        57       133        60
OIR    2025250     91400   18.8200 -110.4900      14.3        58       132        60
OIR    2025250     91400   18.8200 -110.5000      14.7        58       135        60
OIR    2025250     91400   18.8200 -110.5100      15.5        59       137        60
OIR    2025250     91400   18.8200 -110.5200      15.9        59       140        60
OIR    2025250     91400   18.8200 -111.3600      15.6        93       134        60
OIR    2025250     91400   18.8200 -111.3700      14.9        95       128        60
OIR    2025250     91400   18.8200 -111.3800      14.8        95       128        60
OIR    2025250     91400   18.8200 -111.3900      14.7        95       128        60
OIR    2025250     91400   18.8200 -111.4000      14.6        94       125        60
OIR    2025250     91400   18.8200 -111.4100      14.6        94       121        60
OIR    2025250     91400   18.8200 -111.4200      14.5        94       117        60
OIR    2025250     91400   18.8200 -111.4300      14.5        94       117        60
OIR    2025250     91400   18.8200 -111.4400      14.4        94       117        60
OIR    2025250     91400   18.8200 -111.4500      14.4        94       117        60
OIR    2025250     91400   18.8200 -111.4600      14.4        94       117        60
OIR    2025250     91400   18.8200 -111.4700      14.4        93       117        60
OIR    2025250     91400   18.8200 -111.4800      14.3        93       116        60
OIR    2025250     91400   18.8200 -111.4900      14.3        93       116        60
OIR    2025250     91400   18.8200 -111.5000      14.2        93       116        60
OIR    2025250     91400   18.8200 -111.5100      13.9        93       116        60
OIR    2025250     91400   18.8200 -111.5200      13.6        94       122        60
OIR    2025250     91400   18.8200 -111.5300      13.6        94       127        60
OIR    2025250     91400   18.8200 -111.5400      13.5        94       129        60
OIR    2025250     91400   18.8200 -111.5500      13.4        94       126        60
OIR    2025250     91400   18.8200 -111.5600      13.2        94       124        60
OIR    2025250     91400   18.8200 -111.5700      13.1        92       126        60
OIR    2025250     91400   18.8200 -111.5800      12.6        88       128        60
OIR    2025250     91400   18.8200 -111.5900      12.3        82       131        60
OIR    2025250     91400   18.8200 -111.6000      11.9        75       133        60
OIR    2025250     91400   18.8200 -111.6100      11.8        68       136        60
OIR    2025250     91400   18.8200 -111.6200      11.9        63       137        60
OIR    2025250     91400   18.8200 -111.6300      12.1        60       138        60
OIR    2025250     91400   18.8200 -111.6400      12.2        59       138        60
OIR    2025250     91400   18.8200 -111.6500      12.2        59       138        60
OIR    2025250     91400   18.8200 -111.6600      12.2        59       138        60
OIR    2025250     91400   18.8200 -111.6700      12.2        59       138        60
OIR    2025250     91400   18.8200 -111.6800      12.2        59       139        60
OIR    2025250     91400   18.8200 -111.6900      12.1        59       139        60
OIR    2025250     91400   18.8200 -111.7000      12.1        59       140        60
OIR    2025250     91400   18.8200 -113.1700       7.5       144       139        60
OIR    2025250     91400   18.8200 -113.1800       7.3       145       136        60
OIR    2025250     91400   18.8200 -113.1900       7.3       146       134        60
OIR    2025250     91400   18.8200 -113.2000       7.3       146       136        60
OIR    2025250     91400   18.8200 -113.2100       7.2       146       137        60
OIR    2025250     91400   18.8200 -113.2200       7.2       147       139        60
OIR    2025250     91400   18.8200 -113.2300       7.2       147       141        60
OIR    2025250     91400   18.8200 -113.2400       7.2       147       141        60
OIR    2025250     91400   18.8200 -113.2500       7.2       148       139        60
OIR    2025250     91400   18.8200 -113.2600       7.1       149       136        60
OIR    2025250     91400   18.8200 -113.2700       7.0       150       134        60
OIR    2025250     91400   18.8200 -113.2800       7.0       151       132        60
OIR    2025250     91400   18.8200 -113.2900       7.0       152       132        60
OIR    2025250     91400   18.8200 -113.3000       7.0       153       133        60
OIR    2025250     91400   18.8200 -113.3100       7.0       155       131        60
OIR    2025250     91400   18.8200 -113.3200       7.0       157       129        60
OIR    2025250     91400   18.8200 -113.3300       7.0       157       126        60
OIR    2025250     91400   18.8200 -113.3400       7.0       158       125        60
OIR    2025250     91400   18.8200 -113.3500       7.0       158       125        60
OIR    2025250     91400   18.8200 -113.3600       7.0       158       124        60
OIR    2025250     91400   18.8200 -113.3700       7.0       158       123        60
OIR    2025250     91400   18.8200 -113.3800       7.0       158       123        60
OIR    2025250     91400   18.8200 -113.3900       7.0       158       124        60
OIR    2025250     91400   18.8200 -113.4000       7.0       159       124        60
OIR    2025250     91400   18.8200 -113.4100       7.1       159       124        60
OIR    2025250     91400   18.8200 -113.4200       7.3       161       125        60
OIR    2025250     91400   18.8200 -113.4300       7.4       161       130        60
OIR    2025250     91400   18.8200 -113.4400       7.6       163       136        60
OIR    2025250     91400   18.8200 -113.4500       8.0       164       134        60
OIR    2025250     91400   18.8200 -113.4600       8.6       167       127        60
OIR    2025250     91400   18.8200 -113.4700       9.0       169       123        60
OIR    2025250     91400   18.8200 -113.4800       9.3       170       122        60
OIR    2025250     91400   18.8200 -113.4900       9.5       170       122        60
OIR    2025250     91400   18.8200 -113.5000       9.6       171       123        60
OIR    2025250     91400   18.8200 -113.5100       9.6       171       124        60
OIR    2025250     91400   18.8200 -113.5200       9.7       171       124        60
OIR    2025250     91400   18.8200 -113.5300       9.7       172       124        60
OIR    2025250     91400   18.8200 -113.5400       9.7       172       123        60
OIR    2025250     91400   18.8200 -113.5500       9.7       172       124        60
OIR    2025250     91400   18.8200 -113.5600       9.8       172       124        60
OIR    2025250     91400   18.8200 -113.5700       9.8       172       124        60
OIR    2025250     91400   18.8200 -113.5800       9.9       173       123        60
OIR    2025250     91400   18.8200 -113.5900      10.1       174       124        60
OIR    2025250     91400   18.8200 -113.6000      10.4       176       124        60
OIR    2025250     91400   18.8200 -113.6100      10.5       177       124        60
OIR    2025250     91400   18.8200 -113.6200      10.5       178       125        60
OIR    2025250     91400   18.8200 -113.6300      10.6       178       125        60
OIR    2025250     91400   18.8200 -113.6400      10.6       178       125        60
OIR    2025250     91400   18.8200 -113.6500      10.6       179       125        60
OIR    2025250     91400   18.8200 -113.6600      10.6       179       124        60
OIR    2025250     91400   18.8200 -113.6700      10.8       181       122        60
OIR    2025250     91400   18.8200 -113.6800      11.2       182       123        60
OIR    2025250     91400   18.8200 -113.6900      11.5       183       125        60
OIR    2025250     91400   18.8200 -113.7000      11.7       183       125        60
OIR    2025250     91400   18.8200 -113.7100      11.8       184       123        60
OIR    2025250     91400   18.8200 -113.7200      11.9       184       123        60
OIR    2025250     91400   18.8200 -113.7300      12.0       184       125        60
OIR    2025250     91400   18.8200 -113.7400      12.1       185       127        60
OIR    2025250     91400   18.8200 -113.7500      12.1       185       127        60
OIR    2025250     91400   18.8200 -113.7600      12.2       185       127        60
OIR    2025250     91400   18.8200 -113.7700      12.2       186       126        60
OIR    2025250     91400   18.8200 -113.7800      12.3       186       126        60
OIR    2025250     91400   18.8200 -113.7900      12.3       187       125        60
OIR    2025250     91400   18.8200 -113.8000      12.3       187       124        60
OIR    2025250     91400   18.8200 -113.8100      12.3       187       123        60
OIR    2025250     91400   18.8200 -113.8200      12.3       187       125        60
OIR    2025250     91400   18.8200 -113.8300      12.2       187       126        60
OIR    2025250     91400   18.8200 -113.8400      12.2       188       126        60
OIR    2025250     91400   18.8200 -113.8500      12.2       188       125        60
OIR    2025250     91400   18.8200 -113.8600      12.1       188       125        60
OIR    2025250     91400   18.8200 -113.8700      12.1       188       124        60
OIR    2025250     91400   18.8200 -113.8800      12.0       188       123        60
OIR    2025250     91400   18.8200 -113.8900      11.9       188       122        60
OIR    2025250     91400   18.8200 -113.9000      11.8       188       121        60
OIR    2025250     91400   18.8200 -113.9100      11.8       188       122        60
OIR    2025250     91400   18.8200 -113.9200      11.7       189       124        60
OIR    2025250     91400   18.8200 -113.9300      11.7       189       124        60
OIR    2025250     91400   18.8200 -113.9400      11.6       189       125        60
OIR    2025250     91400   18.8200 -113.9500      11.6       189       125        60
OIR    2025250     91400   18.8200 -113.9600      11.6       189       125        60
OIR    2025250     91400   18.8200 -113.9700      11.6       189       125        60
OIR    2025250     91400   18.8200 -113.9800      11.6       190       126        60
OIR    2025250     91400   18.8200 -113.9900      11.5       190       127        60
OIR    2025250     91400   18.8200 -114.0000      11.5       190       127        60
OIR    2025250     91400   18.8200 -114.0100      11.5       190       125        60
OIR    2025250     91400   18.8200 -114.0200      11.5       191       125        60
OIR    2025250     91400   18.8200 -114.0300      11.6       191       125        60
OIR    2025250     91400   18.8200 -114.0400      11.6       191       126        60
OIR    2025250     91400   18.8200 -114.0500      11.6       191       128        60
OIR    2025250     91400   18.8200 -114.0600      11.6       191       131        60
OIR    2025250     91400   18.8200 -114.0700      11.6       191       133        60
OIR    2025250     91400   18.8200 -114.0800      11.6       191       136        60
OIR    2025250     91400   18.8200 -114.0900      11.7       191       136        60
OIR    2025250     91400   18.8200 -114.1000      11.7       191       136        60
OIR    2025250     91400   18.8200 -114.1100      11.7       191       137        60
OIR    2025250     91400   18.8200 -114.1200      11.7       191       140        60
OIR    2025250     91400   18.8200 -114.1500      11.8       191       141        60
OIR    2025250     91400   18.8200 -114.1600      11.8       191       140        60
OIR    2025250     91400   18.8200 -114.1700      11.8       190       138        60
OIR    2025250     91400   18.8200 -114.1800      11.9       190       140        60
OIR    2025250     91400   18.8200 -114.2100      12.0       189       140        60
OIR    2025250     91400   18.8200 -114.2200      12.0       189       140        60
OIR    2025250     91400   18.8100 -110.3600      11.6        54       143        60
OIR    2025250     91400   18.8100 -110.3700      11.8        55       138        60
OIR    2025250     91400   18.8100 -110.3800      12.2        55       137        60
OIR    2025250     91400   18.8100 -110.3900      13.2        56       136        60
OIR    2025250     91400   18.8100 -110.4000      13.7        57       135        60
OIR    2025250     91400   18.8100 -110.4100      14.0        57       134        60
OIR    2025250     91400   18.8100 -110.4200      14.1        57       133        60
OIR    2025250     91400   18.8100 -110.4300      14.1        57       134        60
OIR    2025250     91400   18.8100 -110.4400      14.2        57       134        60
OIR    2025250     91400   18.8100 -110.4500      14.2        57       134        60
OIR    2025250     91400   18.8100 -110.4600      14.2        57       133        60
OIR    2025250     91400   18.8100 -110.4700      14.2        57       131        60
OIR    2025250     91400   18.8100 -110.4800      14.2        57       128        60
OIR    2025250     91400   18.8100 -110.4900      14.2        57       126        60
OIR    2025250     91400   18.8100 -110.5000      14.6        58       129        60
OIR    2025250     91400   18.8100 -110.5100      15.2        58       132        60
OIR    2025250     91400   18.8100 -110.5200      15.7        59       136        60
OIR    2025250     91400   18.8100 -110.5300      15.8        59       141        60
OIR    2025250     91400   18.8100 -111.3600      15.7        92       139        60
OIR    2025250     91400   18.8100 -111.3700      15.1        95       132        60
OIR    2025250     91400   18.8100 -111.3800      14.9        95       131        60
OIR    2025250     91400   18.8100 -111.3900      14.8        95       131        60
OIR    2025250     91400   18.8100 -111.4000      14.7        94       129        60
OIR    2025250     91400   18.8100 -111.4100      14.7        94       124        60
OIR    2025250     91400   18.8100 -111.4200      14.7        94       120        60
OIR    2025250     91400   18.8100 -111.4300      14.6        94       119        60
OIR    2025250     91400   18.8100 -111.4400      14.5        94       116        60
OIR    2025250     91400   18.8100 -111.4500      14.5        93       117        60
OIR    2025250     91400   18.8100 -111.4600      14.5        93       117        60
OIR    2025250     91400   18.8100 -111.4700      14.5        93       117        60
OIR    2025250     91400   18.8100 -111.4800      14.4        92       116        60
OIR    2025250     91400   18.8100 -111.4900      14.4        91       116        60
OIR    2025250     91400   18.8100 -111.5000      14.3        91       116        60
OIR    2025250     91400   18.8100 -111.5100      14.2        91       116        60
OIR    2025250     91400   18.8100 -111.5200      13.8        92       119        60
OIR    2025250     91400   18.8100 -111.5300      13.7        93       123        60
OIR    2025250     91400   18.8100 -111.5400      13.7        93       125        60
OIR    2025250     91400   18.8100 -111.5500      13.5        93       125        60
OIR    2025250     91400   18.8100 -111.5600      13.3        92       125        60
OIR    2025250     91400   18.8100 -111.5700      13.1        90       126        60
OIR    2025250     91400   18.8100 -111.5800      12.8        84       128        60
OIR    2025250     91400   18.8100 -111.5900      12.5        78       130        60
OIR    2025250     91400   18.8100 -111.6000      12.1        71       132        60
OIR    2025250     91400   18.8100 -111.6100      12.0        66       134        60
OIR    2025250     91400   18.8100 -111.6200      12.0        62       137        60
OIR    2025250     91400   18.8100 -111.6300      12.1        60       140        60
OIR    2025250     91400   18.8100 -111.6400      12.2        59       140        60
OIR    2025250     91400   18.8100 -111.6500      12.2        59       138        60
OIR    2025250     91400   18.8100 -111.6600      12.2        59       139        60
OIR    2025250     91400   18.8100 -111.6700      12.2        59       141        60
OIR    2025250     91400   18.8100 -113.1700       7.6       144       141        60
OIR    2025250     91400   18.8100 -113.1800       7.5       145       137        60
OIR    2025250     91400   18.8100 -113.1900       7.4       146       133        60
OIR    2025250     91400   18.8100 -113.2000       7.3       146       133        60
OIR    2025250     91400   18.8100 -113.2100       7.3       146       132        60
OIR    2025250     91400   18.8100 -113.2200       7.2       147       134        60
OIR    2025250     91400   18.8100 -113.2300       7.2       147       137        60
OIR    2025250     91400   18.8100 -113.2400       7.2       147       139        60
OIR    2025250     91400   18.8100 -113.2500       7.2       147       141        60
OIR    2025250     91400   18.8100 -113.2600       7.2       148       141        60
OIR    2025250     91400   18.8100 -113.2700       7.1       149       139        60
OIR    2025250     91400   18.8100 -113.2800       7.1       150       138        60
OIR    2025250     91400   18.8100 -113.2900       7.0       151       134        60
OIR    2025250     91400   18.8100 -113.3000       7.0       152       131        60
OIR    2025250     91400   18.8100 -113.3100       7.0       154       129        60
OIR    2025250     91400   18.8100 -113.3200       7.0       156       130        60
OIR    2025250     91400   18.8100 -113.3300       7.0       157       131        60
OIR    2025250     91400   18.8100 -113.3400       7.0       158       130        60
OIR    2025250     91400   18.8100 -113.3500       7.0       158       130        60
OIR    2025250     91400   18.8100 -113.3600       7.0       158       128        60
OIR    2025250     91400   18.8100 -113.3700       7.0       158       126        60
OIR    2025250     91400   18.8100 -113.3800       7.0       158       127        60
OIR    2025250     91400   18.8100 -113.3900       7.0       158       131        60
OIR    2025250     91400   18.8100 -113.4000       7.0       159       133        60
OIR    2025250     91400   18.8100 -113.4100       7.0       159       130        60
OIR    2025250     91400   18.8100 -113.4200       7.2       160       127        60
OIR    2025250     91400   18.8100 -113.4300       7.3       161       129        60
OIR    2025250     91400   18.8100 -113.4400       7.5       162       132        60
OIR    2025250     91400   18.8100 -113.4500       7.8       163       134        60
OIR    2025250     91400   18.8100 -113.4600       8.3       166       135        60
OIR    2025250     91400   18.8100 -113.4700       8.8       168       134        60
OIR    2025250     91400   18.8100 -113.4800       9.2       169       129        60
OIR    2025250     91400   18.8100 -113.4900       9.4       170       125        60
OIR    2025250     91400   18.8100 -113.5000       9.6       171       130        60
OIR    2025250     91400   18.8100 -113.5100       9.7       171       135        60
OIR    2025250     91400   18.8100 -113.5200       9.7       171       136        60
OIR    2025250     91400   18.8100 -113.5300       9.7       171       136        60
OIR    2025250     91400   18.8100 -113.5400       9.8       171       133        60
OIR    2025250     91400   18.8100 -113.5500       9.8       172       129        60
OIR    2025250     91400   18.8100 -113.5600       9.8       172       124        60
OIR    2025250     91400   18.8100 -113.5700       9.8       172       124        60
OIR    2025250     91400   18.8100 -113.5800       9.9       173       124        60
OIR    2025250     91400   18.8100 -113.5900      10.2       175       125        60
OIR    2025250     91400   18.8100 -113.6000      10.5       177       125        60
OIR    2025250     91400   18.8100 -113.6100      10.6       178       125        60
OIR    2025250     91400   18.8100 -113.6200      10.6       178       125        60
OIR    2025250     91400   18.8100 -113.6300      10.6       178       126        60
OIR    2025250     91400   18.8100 -113.6400      10.6       178       128        60
OIR    2025250     91400   18.8100 -113.6500      10.6       179       129        60
OIR    2025250     91400   18.8100 -113.6600      10.7       180       126        60
OIR    2025250     91400   18.8100 -113.6700      11.1       182       123        60
OIR    2025250     91400   18.8100 -113.6800      11.5       183       123        60
OIR    2025250     91400   18.8100 -113.6900      11.7       183       126        60
OIR    2025250     91400   18.8100 -113.7000      11.8       184       127        60
OIR    2025250     91400   18.8100 -113.7100      11.9       184       124        60
OIR    2025250     91400   18.8100 -113.7200      12.0       184       122        60
OIR    2025250     91400   18.8100 -113.7300      12.1       184       125        60
OIR    2025250     91400   18.8100 -113.7400      12.3       185       127        60
OIR    2025250     91400   18.8100 -113.7500      12.4       185       127        60
OIR    2025250     91400   18.8100 -113.7600      12.5       185       127        60
OIR    2025250     91400   18.8100 -113.7700      12.5       186       127        60
OIR    2025250     91400   18.8100 -113.7800      12.6       186       127        60
OIR    2025250     91400   18.8100 -113.7900      12.6       187       126        60
OIR    2025250     91400   18.8100 -113.8000      12.6       187       124        60
OIR    2025250     91400   18.8100 -113.8100      12.5       187       122        60
OIR    2025250     91400   18.8100 -113.8200      12.5       187       123        60
OIR    2025250     91400   18.8100 -113.8300      12.5       187       125        60
OIR    2025250     91400   18.8100 -113.8400      12.4       188       126        60
OIR    2025250     91400   18.8100 -113.8500      12.4       188       125        60
OIR    2025250     91400   18.8100 -113.8600      12.3       188       125        60
OIR    2025250     91400   18.8100 -113.8700      12.3       188       124        60
OIR    2025250     91400   18.8100 -113.8800      12.2       188       123        60
OIR    2025250     91400   18.8100 -113.8900      12.1       188       121        60
OIR    2025250     91400   18.8100 -113.9000      12.0       188       119        60
OIR    2025250     91400   18.8100 -113.9100      11.8       188       120        60
OIR    2025250     91400   18.8100 -113.9200      11.7       189       123        60
OIR    2025250     91400   18.8100 -113.9300      11.7       189       125        60
OIR    2025250     91400   18.8100 -113.9400      11.6       189       125        60
OIR    2025250     91400   18.8100 -113.9500      11.6       189       125        60
OIR    2025250     91400   18.8100 -113.9600      11.6       189       125        60
OIR    2025250     91400   18.8100 -113.9700      11.6       189       125        60
OIR    2025250     91400   18.8100 -113.9800      11.6       190       127        60
OIR    2025250     91400   18.8100 -113.9900      11.5       190       128        60
OIR    2025250     91400   18.8100 -114.0000      11.5       190       127        60
OIR    2025250     91400   18.8100 -114.0100      11.5       190       126        60
OIR    2025250     91400   18.8100 -114.0200      11.5       191       125        60
OIR    2025250     91400   18.8100 -114.0300      11.6       191       125        60
OIR    2025250     91400   18.8100 -114.0400      11.6       191       125        60
OIR    2025250     91400   18.8100 -114.0500      11.6       191       127        60
OIR    2025250     91400   18.8100 -114.0600      11.6       191       128        60
OIR    2025250     91400   18.8100 -114.0700      11.6       191       130        60
OIR    2025250     91400   18.8100 -114.0800      11.6       191       131        60
OIR    2025250     91400   18.8100 -114.0900      11.6       191       134        60
OIR    2025250     91400   18.8100 -114.1000      11.7       191       137        60
OIR    2025250     91400   18.8100 -114.1100      11.7       191       139        60
OIR    2025250     91400   18.8100 -114.1200      11.7       191       140        60
OIR    2025250     91400   18.8100 -114.1300      11.8       191       141        60
OIR    2025250     91400   18.8000 -110.3600      11.6        55       142        60
OIR    2025250     91400   18.8000 -110.3700      11.8        55       138        60
OIR    2025250     91400   18.8000 -110.3800      12.2        56       137        60
OIR    2025250     91400   18.8000 -110.3900      13.2        57       136        60
OIR    2025250     91400   18.8000 -110.4000      13.7        57       135        60
OIR    2025250     91400   18.8000 -110.4100      14.0        57       135        60
OIR    2025250     91400   18.8000 -110.4200      14.1        57       134        60
OIR    2025250     91400   18.8000 -110.4300      14.1        57       135        60
OIR    2025250     91400   18.8000 -110.4400      14.2        57       136        60
OIR    2025250     91400   18.8000 -110.4500      14.2        57       135        60
OIR    2025250     91400   18.8000 -110.4600      14.2        57       133        60
OIR    2025250     91400   18.8000 -110.4700      14.2        57       130        60
OIR    2025250     91400   18.8000 -110.4800      14.2        57       128        60
OIR    2025250     91400   18.8000 -110.4900      14.2        57       125        60
OIR    2025250     91400   18.8000 -110.5000      14.4        57       126        60
OIR    2025250     91400   18.8000 -110.5100      14.9        58       128        60
OIR    2025250     91400   18.8000 -110.5200      15.6        59       130        60
OIR    2025250     91400   18.8000 -110.5300      15.7        59       134        60
OIR    2025250     91400   18.8000 -110.5400      15.7        59       139        60
OIR    2025250     91400   18.8000 -110.5500      15.6        59       140        60
OIR    2025250     91400   18.8000 -110.5600      15.6        60       142        60
OIR    2025250     91400   18.8000 -111.3700      15.6        96       139        60
OIR    2025250     91400   18.8000 -111.3800      15.4        96       136        60
OIR    2025250     91400   18.8000 -111.3900      15.1        96       135        60
OIR    2025250     91400   18.8000 -111.4000      15.0        95       132        60
OIR    2025250     91400   18.8000 -111.4100      14.9        94       128        60
OIR    2025250     91400   18.8000 -111.4200      14.9        93       123        60
OIR    2025250     91400   18.8000 -111.4300      14.9        92       120        60
OIR    2025250     91400   18.8000 -111.4400      14.7        93       117        60
OIR    2025250     91400   18.8000 -111.4500      14.6        92       116        60
OIR    2025250     91400   18.8000 -111.4600      14.6        92       117        60
OIR    2025250     91400   18.8000 -111.4700      14.6        91       117        60
OIR    2025250     91400   18.8000 -111.4800      14.7        89       116        60
OIR    2025250     91400   18.8000 -111.4900      14.7        88       116        60
OIR    2025250     91400   18.8000 -111.5000      14.6        88       116        60
OIR    2025250     91400   18.8000 -111.5100      14.6        88       116        60
OIR    2025250     91400   18.8000 -111.5200      14.2        89       116        60
OIR    2025250     91400   18.8000 -111.5300      14.2        90       119        60
OIR    2025250     91400   18.8000 -111.5400      14.2        90       121        60
OIR    2025250     91400   18.8000 -111.5500      14.1        89       123        60
OIR    2025250     91400   18.8000 -111.5600      13.6        85       125        60
OIR    2025250     91400   18.8000 -111.5700      13.3        81       127        60
OIR    2025250     91400   18.8000 -111.5800      13.2        77       129        60
OIR    2025250     91400   18.8000 -111.5900      12.9        73       130        60
OIR    2025250     91400   18.8000 -111.6000      12.5        68       130        60
OIR    2025250     91400   18.8000 -111.6100      12.3        63       131        60
OIR    2025250     91400   18.8000 -111.6200      12.2        60       136        60
OIR    2025250     91400   18.8000 -111.6300      12.2        59       141        60
OIR    2025250     91400   18.8000 -111.6500      12.2        59       140        60
OIR    2025250     91400   18.8000 -111.6600      12.2        59       140        60
OIR    2025250     91400   18.8000 -113.1800       7.6       145       142        60
OIR    2025250     91400   18.8000 -113.1900       7.5       146       137        60
OIR    2025250     91400   18.8000 -113.2000       7.4       146       137        60
OIR    2025250     91400   18.8000 -113.2100       7.4       146       138        60
OIR    2025250     91400   18.8000 -113.2200       7.3       146       138        60
OIR    2025250     91400   18.8000 -113.2300       7.3       147       139        60
OIR    2025250     91400   18.8000 -113.2400       7.2       147       139        60
OIR    2025250     91400   18.8000 -113.2500       7.2       147       140        60
OIR    2025250     91400   18.8000 -113.2600       7.2       147       141        60
OIR    2025250     91400   18.8000 -113.2700       7.2       148       140        60
OIR    2025250     91400   18.8000 -113.2800       7.1       149       137        60
OIR    2025250     91400   18.8000 -113.2900       7.1       150       135        60
OIR    2025250     91400   18.8000 -113.3000       7.1       151       131        60
OIR    2025250     91400   18.8000 -113.3100       7.1       153       130        60
OIR    2025250     91400   18.8000 -113.3200       7.0       155       131        60
OIR    2025250     91400   18.8000 -113.3300       7.0       157       133        60
OIR    2025250     91400   18.8000 -113.3400       7.0       157       132        60
OIR    2025250     91400   18.8000 -113.3500       7.0       158       132        60
OIR    2025250     91400   18.8000 -113.3600       6.9       158       130        60
OIR    2025250     91400   18.8000 -113.3700       6.9       158       128        60
OIR    2025250     91400   18.8000 -113.3800       6.9       158       127        60
OIR    2025250     91400   18.8000 -113.3900       6.9       158       135        60
OIR    2025250     91400   18.8000 -113.4000       7.0       159       142        60
OIR    2025250     91400   18.8000 -113.4100       7.0       159       138        60
OIR    2025250     91400   18.8000 -113.4200       7.1       160       133        60
OIR    2025250     91400   18.8000 -113.4300       7.2       160       132        60
OIR    2025250     91400   18.8000 -113.4400       7.4       161       131        60
OIR    2025250     91400   18.8000 -113.4500       7.7       163       132        60
OIR    2025250     91400   18.8000 -113.4600       8.2       165       139        60
OIR    2025250     91400   18.8000 -113.4800       9.2       169       139        60
OIR    2025250     91400   18.8000 -113.4900       9.4       170       130        60
OIR    2025250     91400   18.8000 -113.5000       9.6       171       135        60
OIR    2025250     91400   18.8000 -113.5500       9.8       171       137        60
OIR    2025250     91400   18.8000 -113.5600       9.8       172       129        60
OIR    2025250     91400   18.8000 -113.5700       9.9       172       126        60
OIR    2025250     91400   18.8000 -113.5800      10.1       173       125        60
OIR    2025250     91400   18.8000 -113.5900      10.4       176       126        60
OIR    2025250     91400   18.8000 -113.6000      10.6       177       127        60
OIR    2025250     91400   18.8000 -113.6100      10.6       178       127        60
OIR    2025250     91400   18.8000 -113.6200      10.6       178       126        60
OIR    2025250     91400   18.8000 -113.6300      10.6       179       126        60
OIR    2025250     91400   18.8000 -113.6400      10.6       179       130        60
OIR    2025250     91400   18.8000 -113.6500      10.7       180       135        60
OIR    2025250     91400   18.8000 -113.6600      11.1       181       133        60
OIR    2025250     91400   18.8000 -113.6700      11.5       183       130        60
OIR    2025250     91400   18.8000 -113.6800      11.7       183       128        60
OIR    2025250     91400   18.8000 -113.6900      11.8       184       128        60
OIR    2025250     91400   18.8000 -113.7000      11.9       184       128        60
OIR    2025250     91400   18.8000 -113.7100      12.0       184       126        60
OIR    2025250     91400   18.8000 -113.7200      12.2       184       125        60
OIR    2025250     91400   18.8000 -113.7300      12.5       184       125        60
OIR    2025250     91400   18.8000 -113.7400      12.8       185       126        60
OIR    2025250     91400   18.8000 -113.7500      13.0       185       127        60
OIR    2025250     91400   18.8000 -113.7600      13.2       185       127        60
OIR    2025250     91400   18.8000 -113.7700      13.3       186       127        60
OIR    2025250     91400   18.8000 -113.7800      13.3       186       126        60
OIR    2025250     91400   18.8000 -113.7900      13.2       187       126        60
OIR    2025250     91400   18.8000 -113.8000      13.1       187       126        60
OIR    2025250     91400   18.8000 -113.8100      13.0       187       126        60
OIR    2025250     91400   18.8000 -113.8200      12.9       187       126        60
OIR    2025250     91400   18.8000 -113.8300      12.8       187       126        60
OIR    2025250     91400   18.8000 -113.8400      12.7       188       126        60
OIR    2025250     91400   18.8000 -113.8500      12.7       188       126        60
OIR    2025250     91400   18.8000 -113.8600      12.6       188       125        60
OIR    2025250     91400   18.8000 -113.8700      12.5       188       125        60
OIR    2025250     91400   18.8000 -113.8800      12.4       188       125        60
OIR    2025250     91400   18.8000 -113.8900      12.3       188       123        60
OIR    2025250     91400   18.8000 -113.9000      12.1       188       122        60
OIR    2025250     91400   18.8000 -113.9100      12.0       188       122        60
OIR    2025250     91400   18.8000 -113.9200      11.8       189       124        60
OIR    2025250     91400   18.8000 -113.9300      11.7       189       126        60
OIR    2025250     91400   18.8000 -113.9400      11.6       189       126        60
OIR    2025250     91400   18.8000 -113.9500      11.6       189       126        60
OIR    2025250     91400   18.8000 -113.9600      11.6       189       126        60
OIR    2025250     91400   18.8000 -113.9700      11.6       189       126        60
OIR    2025250     91400   18.8000 -113.9800      11.6       190       127        60
OIR    2025250     91400   18.8000 -113.9900      11.5       190       128        60
OIR    2025250     91400   18.8000 -114.0000      11.5       190       128        60
OIR    2025250     91400   18.8000 -114.0100      11.5       190       127        60
OIR    2025250     91400   18.8000 -114.0200      11.5       191       126        60
OIR    2025250     91400   18.8000 -114.0300      11.5       191       126        60
OIR    2025250     91400   18.8000 -114.0400      11.6       191       126        60
OIR    2025250     91400   18.8000 -114.0500      11.6       191       126        60
OIR    2025250     91400   18.8000 -114.0600      11.6       191       128        60
OIR    2025250     91400   18.8000 -114.0700      11.6       190       128        60
OIR    2025250     91400   18.8000 -114.0800      11.6       190       129        60
OIR    2025250     91400   18.8000 -114.0900      11.6       190       131        60
OIR    2025250     91400   18.8000 -114.1000      11.6       190       136        60
OIR    2025250     91400   18.8000 -114.1100      11.7       190       140        60
OIR    2025250     91400   18.8000 -114.1200      11.7       191       141        60
OIR    2025250     91400   18.8000 -114.1300      11.8       191       141        60
OIR    2025250     91400   18.7900 -110.3600      11.7        55       143        60
OIR    2025250     91400   18.7900 -110.3700      11.8        55       140        60
OIR    2025250     91400   18.7900 -110.3800      12.2        56       138        60
OIR    2025250     91400   18.7900 -110.3900      13.3        57       137        60
OIR    2025250     91400   18.7900 -110.4000      13.8        57       136        60
OIR    2025250     91400   18.7900 -110.4100      14.0        57       135        60
OIR    2025250     91400   18.7900 -110.4200      14.1        57       134        60
OIR    2025250     91400   18.7900 -110.4300      14.2        57       134        60
OIR    2025250     91400   18.7900 -110.4400      14.2        57       135        60
OIR    2025250     91400   18.7900 -110.4500      14.2        57       134        60
OIR    2025250     91400   18.7900 -110.4600      14.2        57       132        60
OIR    2025250     91400   18.7900 -110.4700      14.2        57       130        60
OIR    2025250     91400   18.7900 -110.4800      14.2        57       127        60
OIR    2025250     91400   18.7900 -110.4900      14.3        57       125        60
OIR    2025250     91400   18.7900 -110.5000      14.3        57       124        60
OIR    2025250     91400   18.7900 -110.5100      14.9        58       125        60
OIR    2025250     91400   18.7900 -110.5200      15.6        59       125        60
OIR    2025250     91400   18.7900 -110.5300      15.6        59       128        60
OIR    2025250     91400   18.7900 -110.5400      15.6        59       132        60
OIR    2025250     91400   18.7900 -110.5500      15.6        59       134        60
OIR    2025250     91400   18.7900 -110.5600      15.6        60       135        60
OIR    2025250     91400   18.7900 -110.5700      15.7        61       137        60
OIR    2025250     91400   18.7900 -110.5800      16.2        61       141        60
OIR    2025250     91400   18.7900 -111.3900      16.0        96       141        60
OIR    2025250     91400   18.7900 -111.4000      15.7        94       136        60
OIR    2025250     91400   18.7900 -111.4100      15.5        92       131        60
OIR    2025250     91400   18.7900 -111.4200      15.4        90       126        60
OIR    2025250     91400   18.7900 -111.4300      15.4        89       122        60
OIR    2025250     91400   18.7900 -111.4400      15.2        89       119        60
OIR    2025250     91400   18.7900 -111.4500      15.1        89       116        60
OIR    2025250     91400   18.7900 -111.4600      15.0        88       116        60
OIR    2025250     91400   18.7900 -111.4700      15.0        87       116        60
OIR    2025250     91400   18.7900 -111.4800      14.9        86       117        60
OIR    2025250     91400   18.7900 -111.4900      15.0        86       119        60
OIR    2025250     91400   18.7900 -111.5000      14.9        86       120        60
OIR    2025250     91400   18.7900 -111.5100      15.0        86       121        60
OIR    2025250     91400   18.7900 -111.5200      14.9        86       122        60
OIR    2025250     91400   18.7900 -111.5300      14.8        86       121        60
OIR    2025250     91400   18.7900 -111.5400      14.7        87       121        60
OIR    2025250     91400   18.7900 -111.5500      14.5        85       124        60
OIR    2025250     91400   18.7900 -111.5600      13.9        80       127        60
OIR    2025250     91400   18.7900 -111.5700      13.5        77       129        60
OIR    2025250     91400   18.7900 -111.5800      13.3        75       132        60
OIR    2025250     91400   18.7900 -111.5900      13.1        72       134        60
OIR    2025250     91400   18.7900 -111.6000      12.7        68       134        60
OIR    2025250     91400   18.7900 -111.6100      12.4        62       134        60
OIR    2025250     91400   18.7900 -111.6200      12.2        60       137        60
OIR    2025250     91400   18.7900 -111.6300      12.2        59       142        60
OIR    2025250     91400   18.7900 -111.6600      12.2        59       141        60
OIR    2025250     91400   18.7900 -111.7800      11.9        62       142        60
OIR    2025250     91400   18.7900 -111.7900      11.9        64       142        60
OIR    2025250     91400   18.7900 -111.8000      11.8        66       141        60
OIR    2025250     91400   18.7900 -113.2000       7.5       146       140        60
OIR    2025250     91400   18.7900 -113.2300       7.3       147       141        60
OIR    2025250     91400   18.7900 -113.2400       7.3       147       139        60
OIR    2025250     91400   18.7900 -113.2500       7.2       147       139        60
OIR    2025250     91400   18.7900 -113.2600       7.2       147       139        60
OIR    2025250     91400   18.7900 -113.2700       7.2       148       137        60
OIR    2025250     91400   18.7900 -113.2800       7.2       148       134        60
OIR    2025250     91400   18.7900 -113.2900       7.1       149       132        60
OIR    2025250     91400   18.7900 -113.3000       7.1       150       132        60
OIR    2025250     91400   18.7900 -113.3100       7.1       152       132        60
OIR    2025250     91400   18.7900 -113.3200       7.0       155       133        60
OIR    2025250     91400   18.7900 -113.3300       7.0       157       133        60
OIR    2025250     91400   18.7900 -113.3400       7.0       157       132        60
OIR    2025250     91400   18.7900 -113.3500       6.9       158       130        60
OIR    2025250     91400   18.7900 -113.3600       6.9       158       128        60
OIR    2025250     91400   18.7900 -113.3700       6.9       158       126        60
OIR    2025250     91400   18.7900 -113.3800       6.9       158       125        60
OIR    2025250     91400   18.7900 -113.3900       6.9       158       133        60
OIR    2025250     91400   18.7900 -113.4300       7.2       160       142        60
OIR    2025250     91400   18.7900 -113.4900       9.5       169       142        60
OIR    2025250     91400   18.7900 -113.5000       9.7       170       142        60
OIR    2025250     91400   18.7900 -113.5500       9.8       171       140        60
OIR    2025250     91400   18.7900 -113.5600       9.8       172       132        60
OIR    2025250     91400   18.7900 -113.5700       9.9       172       128        60
OIR    2025250     91400   18.7900 -113.5800      10.2       175       126        60
OIR    2025250     91400   18.7900 -113.5900      10.6       177       125        60
OIR    2025250     91400   18.7900 -113.6000      10.7       178       127        60
OIR    2025250     91400   18.7900 -113.6100      10.7       178       129        60
OIR    2025250     91400   18.7900 -113.6200      10.8       179       127        60
OIR    2025250     91400   18.7900 -113.6300      10.9       180       126        60
OIR    2025250     91400   18.7900 -113.6400      11.0       181       130        60
OIR    2025250     91400   18.7900 -113.6500      11.2       182       134        60
OIR    2025250     91400   18.7900 -113.6600      11.5       183       134        60
OIR    2025250     91400   18.7900 -113.6700      11.7       183       131        60
OIR    2025250     91400   18.7900 -113.6800      11.8       184       129        60
OIR    2025250     91400   18.7900 -113.6900      11.8       184       128        60
OIR    2025250     91400   18.7900 -113.7000      12.0       184       128        60
OIR    2025250     91400   18.7900 -113.7100      12.2       184       128        60
OIR    2025250     91400   18.7900 -113.7200      12.6       184       127        60
OIR    2025250     91400   18.7900 -113.7300      13.0       184       127        60
OIR    2025250     91400   18.7900 -113.7400      13.3       184       127        60
OIR    2025250     91400   18.7900 -113.7500      13.6       185       127        60
OIR    2025250     91400   18.7900 -113.7600      13.9       185       127        60
OIR    2025250     91400   18.7900 -113.7700      14.1       186       127        60
OIR    2025250     91400   18.7900 -113.7800      14.2       186       127        60
OIR    2025250     91400   18.7900 -113.7900      14.2       186       126        60
OIR    2025250     91400   18.7900 -113.8000      13.9       187       127        60
OIR    2025250     91400   18.7900 -113.8100      13.6       187       128        60
OIR    2025250     91400   18.7900 -113.8200      13.4       187       129        60
OIR    2025250     91400   18.7900 -113.8300      13.3       187       128        60
OIR    2025250     91400   18.7900 -113.8400      13.2       187       127        60
OIR    2025250     91400   18.7900 -113.8500      13.1       187       126        60
OIR    2025250     91400   18.7900 -113.8600      13.0       187       126        60
OIR    2025250     91400   18.7900 -113.8700      12.9       187       126        60
OIR    2025250     91400   18.7900 -113.8800      12.7       187       126        60
OIR    2025250     91400   18.7900 -113.8900      12.5       187       126        60
OIR    2025250     91400   18.7900 -113.9000      12.4       188       125        60
OIR    2025250     91400   18.7900 -113.9100      12.1       188       125        60
OIR    2025250     91400   18.7900 -113.9200      11.9       188       125        60
OIR    2025250     91400   18.7900 -113.9300      11.7       189       126        60
OIR    2025250     91400   18.7900 -113.9400      11.6       189       127        60
OIR    2025250     91400   18.7900 -113.9500      11.6       189       128        60
OIR    2025250     91400   18.7900 -113.9600      11.6       189       128        60
OIR    2025250     91400   18.7900 -113.9700      11.6       189       128        60
OIR    2025250     91400   18.7900 -113.9800      11.6       190       128        60
OIR    2025250     91400   18.7900 -113.9900      11.5       190       128        60
OIR    2025250     91400   18.7900 -114.0000      11.5       190       128        60
OIR    2025250     91400   18.7900 -114.0100      11.5       190       127        60
OIR    2025250     91400   18.7900 -114.0200      11.5       190       127        60
OIR    2025250     91400   18.7900 -114.0300      11.5       191       127        60
OIR    2025250     91400   18.7900 -114.0400      11.5       190       127        60
OIR    2025250     91400   18.7900 -114.0500      11.6       190       128        60
OIR    2025250     91400   18.7900 -114.0600      11.6       190       129        60
OIR    2025250     91400   18.7900 -114.0700      11.6       190       130        60
OIR    2025250     91400   18.7900 -114.0800      11.6       190       131        60
OIR    2025250     91400   18.7900 -114.0900      11.6       190       132        60
OIR    2025250     91400   18.7900 -114.1000      11.6       190       136        60
OIR    2025250     91400   18.7900 -114.1100      11.7       190       140        60
OIR    2025250     91400   18.7900 -114.1200      11.7       190       141        60
OIR    2025250     91400   18.7800 -110.3700      11.8        55       142        60
OIR    2025250     91400   18.7800 -110.3800      12.2        56       140        60
OIR    2025250     91400   18.7800 -110.3900      13.6        57       139        60
OIR    2025250     91400   18.7800 -110.4000      13.9        57       138        60
OIR    2025250     91400   18.7800 -110.4100      14.1        57       136        60
OIR    2025250     91400   18.7800 -110.4200      14.2        57       133        60
OIR    2025250     91400   18.7800 -110.4300      14.2        57       131        60
OIR    2025250     91400   18.7800 -110.4400      14.2        57       130        60
OIR    2025250     91400   18.7800 -110.4500      14.2        57       129        60
OIR    2025250     91400   18.7800 -110.4600      14.2        57       129        60
OIR    2025250     91400   18.7800 -110.4700      14.3        57       129        60
OIR    2025250     91400   18.7800 -110.4800      14.3        57       128        60
OIR    2025250     91400   18.7800 -110.4900      14.3        57       125        60
OIR    2025250     91400   18.7800 -110.5000      14.4        57       123        60
OIR    2025250     91400   18.7800 -110.5100      15.0        58       123        60
OIR    2025250     91400   18.7800 -110.5200      15.6        58       123        60
OIR    2025250     91400   18.7800 -110.5300      15.7        58       124        60
OIR    2025250     91400   18.7800 -110.5400      15.6        59       126        60
OIR    2025250     91400   18.7800 -110.5500      15.6        59       128        60
OIR    2025250     91400   18.7800 -110.5600      15.7        59       130        60
OIR    2025250     91400   18.7800 -110.5700      15.9        60       133        60
OIR    2025250     91400   18.7800 -110.5800      16.2        61       139        60
OIR    2025250     91400   18.7800 -111.4000      16.4        91       139        60
OIR    2025250     91400   18.7800 -111.4100      16.2        89       133        60
OIR    2025250     91400   18.7800 -111.4200      15.8        87       127        60
OIR    2025250     91400   18.7800 -111.4300      15.8        86       123        60
OIR    2025250     91400   18.7800 -111.4400      15.8        85       120        60
OIR    2025250     91400   18.7800 -111.4500      15.6        85       116        60
OIR    2025250     91400   18.7800 -111.4600      15.5        85       116        60
OIR    2025250     91400   18.7800 -111.4700      15.3        84       116        60
OIR    2025250     91400   18.7800 -111.4800      15.2        83       119        60
OIR    2025250     91400   18.7800 -111.4900      15.2        83       121        60
OIR    2025250     91400   18.7800 -111.5000      15.1        84       123        60
OIR    2025250     91400   18.7800 -111.5100      15.1        84       126        60
OIR    2025250     91400   18.7800 -111.5200      15.1        84       128        60
OIR    2025250     91400   18.7800 -111.5300      15.0        85       124        60
OIR    2025250     91400   18.7800 -111.5400      14.9        84       120        60
OIR    2025250     91400   18.7800 -111.5500      14.6        82       123        60
OIR    2025250     91400   18.7800 -111.5600      13.9        77       128        60
OIR    2025250     91400   18.7800 -111.5700      13.6        75       132        60
OIR    2025250     91400   18.7800 -111.5800      13.5        74       135        60
OIR    2025250     91400   18.7800 -111.5900      13.3        72       137        60
OIR    2025250     91400   18.7800 -111.6000      12.9        68       138        60
OIR    2025250     91400   18.7800 -111.6100      12.5        63       138        60
OIR    2025250     91400   18.7800 -111.6200      12.3        60       140        60
OIR    2025250     91400   18.7800 -113.2200       7.4       146       142        60
OIR    2025250     91400   18.7800 -113.2300       7.4       146       140        60
OIR    2025250     91400   18.7800 -113.2400       7.3       147       137        60
OIR    2025250     91400   18.7800 -113.2500       7.3       147       138        60
OIR    2025250     91400   18.7800 -113.2600       7.3       147       138        60
OIR    2025250     91400   18.7800 -113.2700       7.2       147       138        60
OIR    2025250     91400   18.7800 -113.2800       7.2       147       135        60
OIR    2025250     91400   18.7800 -113.2900       7.2       148       133        60
OIR    2025250     91400   18.7800 -113.3000       7.1       149       132        60
OIR    2025250     91400   18.7800 -113.3100       7.1       151       132        60
OIR    2025250     91400   18.7800 -113.3200       7.0       154       132        60
OIR    2025250     91400   18.7800 -113.3300       7.0       157       132        60
OIR    2025250     91400   18.7800 -113.3400       6.9       157       131        60
OIR    2025250     91400   18.7800 -113.3500       6.9       158       128        60
OIR    2025250     91400   18.7800 -113.3600       6.9       158       126        60
OIR    2025250     91400   18.7800 -113.3700       6.9       158       126        60
OIR    2025250     91400   18.7800 -113.3800       6.9       158       125        60
OIR    2025250     91400   18.7800 -113.3900       6.9       158       132        60
OIR    2025250     91400   18.7800 -113.4000       7.0       159       142        60
OIR    2025250     91400   18.7800 -113.5600       9.9       172       134        60
OIR    2025250     91400   18.7800 -113.5700      10.0       172       129        60
OIR    2025250     91400   18.7800 -113.5800      10.4       176       126        60
OIR    2025250     91400   18.7800 -113.5900      10.7       178       124        60
OIR    2025250     91400   18.7800 -113.6000      10.8       178       127        60
OIR    2025250     91400   18.7800 -113.6100      10.9       179       130        60
OIR    2025250     91400   18.7800 -113.6200      11.0       180       130        60
OIR    2025250     91400   18.7800 -113.6300      11.1       181       128        60
OIR    2025250     91400   18.7800 -113.6400      11.3       182       128        60
OIR    2025250     91400   18.7800 -113.6500      11.4       183       129        60
OIR    2025250     91400   18.7800 -113.6600      11.6       183       129        60
OIR    2025250     91400   18.7800 -113.6700      11.7       184       127        60
OIR    2025250     91400   18.7800 -113.6800      11.8       184       126        60
OIR    2025250     91400   18.7800 -113.6900      11.9       184       127        60
OIR    2025250     91400   18.7800 -113.7000      12.0       184       128        60
OIR    2025250     91400   18.7800 -113.7100      12.3       184       129        60
OIR    2025250     91400   18.7800 -113.7200      12.7       184       128        60
OIR    2025250     91400   18.7800 -113.7300      13.2       184       128        60
OIR    2025250     91400   18.7800 -113.7400      13.5       184       129        60
OIR    2025250     91400   18.7800 -113.7500      13.8       185       129        60
OIR    2025250     91400   18.7800 -113.7600      14.1       185       129        60
OIR    2025250     91400   18.7800 -113.7700      14.3       185       128        60
OIR    2025250     91400   18.7800 -113.7800      14.7       186       128        60
OIR    2025250     91400   18.7800 -113.7900      14.8       186       127        60
OIR    2025250     91400   18.7800 -113.8000      14.6       186       127        60
OIR    2025250     91400   18.7800 -113.8100      14.2       187       128        60
OIR    2025250     91400   18.7800 -113.8200      13.8       187       128        60
OIR    2025250     91400   18.7800 -113.8300      13.6       187       128        60
OIR    2025250     91400   18.7800 -113.8400      13.5       187       128        60
OIR    2025250     91400   18.7800 -113.8500      13.4       187       127        60
OIR    2025250     91400   18.7800 -113.8600      13.3       187       127        60
OIR    2025250     91400   18.7800 -113.8700      13.2       187       127        60
OIR    2025250     91400   18.7800 -113.8800      13.0       187       127        60
OIR    2025250     91400   18.7800 -113.8900      12.9       187       127        60
OIR    2025250     91400   18.7800 -113.9000      12.7       187       127        60
OIR    2025250     91400   18.7800 -113.9100      12.5       188       128        60
OIR    2025250     91400   18.7800 -113.9200      12.1       188       128        60
OIR    2025250     91400   18.7800 -113.9300      11.6       189       128        60
OIR    2025250     91400   18.7800 -113.9400      11.6       189       129        60
OIR    2025250     91400   18.7800 -113.9500      11.6       189       131        60
OIR    2025250     91400   18.7800 -113.9600      11.6       189       131        60
OIR    2025250     91400   18.7800 -113.9700      11.6       189       130        60
OIR    2025250     91400   18.7800 -113.9800      11.6       190       130        60
OIR    2025250     91400   18.7800 -113.9900      11.5       190       128        60
OIR    2025250     91400   18.7800 -114.0000      11.5       190       127        60
OIR    2025250     91400   18.7800 -114.0100      11.5       190       127        60
OIR    2025250     91400   18.7800 -114.0200      11.5       190       127        60
OIR    2025250     91400   18.7800 -114.0300      11.5       190       127        60
OIR    2025250     91400   18.7800 -114.0400      11.5       190       127        60
OIR    2025250     91400   18.7800 -114.0500      11.5       190       128        60
OIR    2025250     91400   18.7800 -114.0600      11.5       190       130        60
OIR    2025250     91400   18.7800 -114.0700      11.6       190       132        60
OIR    2025250     91400   18.7800 -114.0800      11.6       190       132        60
OIR    2025250     91400   18.7800 -114.0900      11.6       190       132        60
OIR    2025250     91400   18.7800 -114.1000      11.6       190       135        60
OIR    2025250     91400   18.7800 -114.1100      11.6       190       138        60
OIR    2025250     91400   18.7800 -114.1200      11.7       190       140        60
OIR    2025250     91400   18.7800 -114.1300      11.7       191       141        60
OIR    2025250     91400   18.7700 -110.3800      12.2        56       142        60
OIR    2025250     91400   18.7700 -110.3900      13.8        56       141        60
OIR    2025250     91400   18.7700 -110.4000      14.1        56       139        60
OIR    2025250     91400   18.7700 -110.4100      14.2        56       137        60
OIR    2025250     91400   18.7700 -110.4200      14.2        56       133        60
OIR    2025250     91400   18.7700 -110.4300      14.2        56       129        60
OIR    2025250     91400   18.7700 -110.4400      14.2        56       128        60
OIR    2025250     91400   18.7700 -110.4500      14.2        57       126        60
OIR    2025250     91400   18.7700 -110.4600      14.3        57       127        60
OIR    2025250     91400   18.7700 -110.4700      14.3        57       128        60
OIR    2025250     91400   18.7700 -110.4800      14.3        57       128        60
OIR    2025250     91400   18.7700 -110.4900      14.3        57       125        60
OIR    2025250     91400   18.7700 -110.5000      14.5        57       123        60
OIR    2025250     91400   18.7700 -110.5100      15.0        58       122        60
OIR    2025250     91400   18.7700 -110.5200      15.5        58       121        60
OIR    2025250     91400   18.7700 -110.5300      15.7        58       121        60
OIR    2025250     91400   18.7700 -110.5400      15.7        58       121        60
OIR    2025250     91400   18.7700 -110.5500      15.7        59       122        60
OIR    2025250     91400   18.7700 -110.5600      15.9        59       125        60
OIR    2025250     91400   18.7700 -110.5700      16.2        60       129        60
OIR    2025250     91400   18.7700 -110.5800      16.5        61       136        60
OIR    2025250     91400   18.7700 -111.4000      17.1        89       139        60
OIR    2025250     91400   18.7700 -111.4100      16.7        87       133        60
OIR    2025250     91400   18.7700 -111.4200      16.2        85       126        60
OIR    2025250     91400   18.7700 -111.4300      16.1        84       121        60
OIR    2025250     91400   18.7700 -111.4400      16.1        84       122        60
OIR    2025250     91400   18.7700 -111.4500      15.9        84       123        60
OIR    2025250     91400   18.7700 -111.4600      15.7        84       124        60
OIR    2025250     91400   18.7700 -111.4700      15.5        83       124        60
OIR    2025250     91400   18.7700 -111.4800      15.4        83       123        60
OIR    2025250     91400   18.7700 -111.4900      15.3        83       122        60
OIR    2025250     91400   18.7700 -111.5000      15.2        83       122        60
OIR    2025250     91400   18.7700 -111.5100      15.2        83       124        60
OIR    2025250     91400   18.7700 -111.5200      15.2        83       126        60
OIR    2025250     91400   18.7700 -111.5300      15.1        83       128        60
OIR    2025250     91400   18.7700 -111.5400      14.8        82       129        60
OIR    2025250     91400   18.7700 -111.5500      14.4        79       131        60
OIR    2025250     91400   18.7700 -111.5600      13.8        75       134        60
OIR    2025250     91400   18.7700 -111.5700      13.6        74       137        60
OIR    2025250     91400   18.7700 -111.5800      13.6        74       138        60
OIR    2025250     91400   18.7700 -111.5900      13.5        73       140        60
OIR    2025250     91400   18.7700 -111.6000      13.1        70       141        60
OIR    2025250     91400   18.7700 -111.6100      12.6        65       142        60
OIR    2025250     91400   18.7700 -113.2200       7.5       146       139        60
OIR    2025250     91400   18.7700 -113.2300       7.4       146       137        60
OIR    2025250     91400   18.7700 -113.2400       7.4       147       135        60
OIR    2025250     91400   18.7700 -113.2500       7.3       147       136        60
OIR    2025250     91400   18.7700 -113.2600       7.3       147       138        60
OIR    2025250     91400   18.7700 -113.2700       7.3       147       139        60
OIR    2025250     91400   18.7700 -113.2800       7.3       147       138        60
OIR    2025250     91400   18.7700 -113.2900       7.3       148       137        60
OIR    2025250     91400   18.7700 -113.3000       7.2       148       134        60
OIR    2025250     91400   18.7700 -113.3100       7.2       150       131        60
OIR    2025250     91400   18.7700 -113.3200       7.0       154       129        60
OIR    2025250     91400   18.7700 -113.3300       7.0       156       127        60
OIR    2025250     91400   18.7700 -113.3400       6.9       157       126        60
OIR    2025250     91400   18.7700 -113.3500       6.9       158       126        60
OIR    2025250     91400   18.7700 -113.3600       6.9       158       126        60
OIR    2025250     91400   18.7700 -113.3700       6.9       158       126        60
OIR    2025250     91400   18.7700 -113.3800       6.9       158       127        60
OIR    2025250     91400   18.7700 -113.3900       6.9       158       132        60
OIR    2025250     91400   18.7700 -113.4000       7.0       159       140        60
OIR    2025250     91400   18.7700 -113.4900       9.6       169       142        60
OIR    2025250     91400   18.7700 -113.5000       9.7       170       141        60
OIR    2025250     91400   18.7700 -113.5100       9.7       171       141        60
OIR    2025250     91400   18.7700 -113.5200       9.8       171       142        60
OIR    2025250     91400   18.7700 -113.5300       9.8       171       141        60
OIR    2025250     91400   18.7700 -113.5400       9.8       171       140        60
OIR    2025250     91400   18.7700 -113.5500       9.8       171       136        60
OIR    2025250     91400   18.7700 -113.5600       9.9       172       131        60
OIR    2025250     91400   18.7700 -113.5700      10.1       173       127        60
OIR    2025250     91400   18.7700 -113.5800      10.5       176       126        60
OIR    2025250     91400   18.7700 -113.5900      10.7       178       126        60
OIR    2025250     91400   18.7700 -113.6000      10.9       179       128        60
OIR    2025250     91400   18.7700 -113.6100      11.0       180       130        60
OIR    2025250     91400   18.7700 -113.6200      11.2       181       131        60
OIR    2025250     91400   18.7700 -113.6300      11.3       182       131        60
OIR    2025250     91400   18.7700 -113.6400      11.4       183       131        60
OIR    2025250     91400   18.7700 -113.6500      11.5       183       130        60
OIR    2025250     91400   18.7700 -113.6600      11.6       183       130        60
OIR    2025250     91400   18.7700 -113.6700      11.7       184       127        60
OIR    2025250     91400   18.7700 -113.6800      11.8       184       125        60
OIR    2025250     91400   18.7700 -113.6900      11.9       184       126        60
OIR    2025250     91400   18.7700 -113.7000      12.0       184       128        60
OIR    2025250     91400   18.7700 -113.7100      12.3       184       129        60
OIR    2025250     91400   18.7700 -113.7200      12.7       184       130        60
OIR    2025250     91400   18.7700 -113.7300      13.3       184       130        60
OIR    2025250     91400   18.7700 -113.7400      13.7       185       131        60
OIR    2025250     91400   18.7700 -113.7500      14.1       185       131        60
OIR    2025250     91400   18.7700 -113.7600      14.7       185       130        60
OIR    2025250     91400   18.7700 -113.7700      14.9       186       129        60
OIR    2025250     91400   18.7700 -113.7800      15.0       186       129        60
OIR    2025250     91400   18.7700 -113.7900      15.1       186       128        60
OIR    2025250     91400   18.7700 -113.8000      15.0       186       128        60
OIR    2025250     91400   18.7700 -113.8100      14.7       187       128        60
OIR    2025250     91400   18.7700 -113.8200      14.1       187       128        60
OIR    2025250     91400   18.7700 -113.8300      13.8       187       128        60
OIR    2025250     91400   18.7700 -113.8400      13.7       187       128        60
OIR    2025250     91400   18.7700 -113.8500      13.6       187       128        60
OIR    2025250     91400   18.7700 -113.8600      13.5       187       128        60
OIR    2025250     91400   18.7700 -113.8700      13.4       187       128        60
OIR    2025250     91400   18.7700 -113.8800      13.2       187       128        60
OIR    2025250     91400   18.7700 -113.8900      13.0       187       129        60
OIR    2025250     91400   18.7700 -113.9000      12.8       187       129        60
OIR    2025250     91400   18.7700 -113.9100      12.7       187       130        60
OIR    2025250     91400   18.7700 -113.9200      12.2       188       131        60
OIR    2025250     91400   18.7700 -113.9300      11.7       188       132        60
OIR    2025250     91400   18.7700 -113.9400      11.6       189       133        60
OIR    2025250     91400   18.7700 -113.9500      11.5       189       133        60
OIR    2025250     91400   18.7700 -113.9600      11.6       189       134        60
OIR    2025250     91400   18.7700 -113.9700      11.6       189       133        60
OIR    2025250     91400   18.7700 -113.9800      11.6       189       132        60
OIR    2025250     91400   18.7700 -113.9900      11.4       190       129        60
OIR    2025250     91400   18.7700 -114.0000      11.3       190       126        60
OIR    2025250     91400   18.7700 -114.0100      11.4       191       126        60
OIR    2025250     91400   18.7700 -114.0200      11.5       191       126        60
OIR    2025250     91400   18.7700 -114.0300      11.5       190       126        60
OIR    2025250     91400   18.7700 -114.0400      11.5       190       126        60
OIR    2025250     91400   18.7700 -114.0500      11.5       190       127        60
OIR    2025250     91400   18.7700 -114.0600      11.5       190       130        60
OIR    2025250     91400   18.7700 -114.0700      11.5       190       132        60
OIR    2025250     91400   18.7700 -114.0800      11.6       190       132        60
OIR    2025250     91400   18.7700 -114.0900      11.6       190       132        60
OIR    2025250     91400   18.7700 -114.1000      11.6       190       132        60
OIR    2025250     91400   18.7700 -114.1100      11.6       190       134        60
OIR    2025250     91400   18.7700 -114.1200      11.5       190       135        60
OIR    2025250     91400   18.7700 -114.1300      11.4       193       135        60
OIR    2025250     91400   18.7700 -114.1400      11.2       201       136        60
OIR    2025250     91400   18.7600 -110.3900      13.9        56       142        60
OIR    2025250     91400   18.7600 -110.4000      14.2        56       140        60
OIR    2025250     91400   18.7600 -110.4100      14.2        56       137        60
OIR    2025250     91400   18.7600 -110.4200      14.2        56       134        60
OIR    2025250     91400   18.7600 -110.4300      14.2        56       130        60
OIR    2025250     91400   18.7600 -110.4400      14.2        56       129        60
OIR    2025250     91400   18.7600 -110.4500      14.3        56       127        60
OIR    2025250     91400   18.7600 -110.4600      14.3        56       127        60
OIR    2025250     91400   18.7600 -110.4700      14.3        57       127        60
OIR    2025250     91400   18.7600 -110.4800      14.3        57       127        60
OIR    2025250     91400   18.7600 -110.4900      14.3        57       125        60
OIR    2025250     91400   18.7600 -110.5000      14.5        57       123        60
OIR    2025250     91400   18.7600 -110.5100      14.9        57       122        60
OIR    2025250     91400   18.7600 -110.5200      15.4        58       121        60
OIR    2025250     91400   18.7600 -110.5300      15.7        58       120        60
OIR    2025250     91400   18.7600 -110.5400      15.8        58       121        60
OIR    2025250     91400   18.7600 -110.5500      16.1        58       121        60
OIR    2025250     91400   18.7600 -110.5600      16.1        59       123        60
OIR    2025250     91400   18.7600 -110.5700      16.3        59       125        60
OIR    2025250     91400   18.7600 -110.5800      16.7        60       130        60
OIR    2025250     91400   18.7600 -110.5900      16.8        60       137        60
OIR    2025250     91400   18.7600 -111.4000      17.0        86       140        60
OIR    2025250     91400   18.7600 -111.4100      16.8        84       133        60
OIR    2025250     91400   18.7600 -111.4200      16.6        83       126        60
OIR    2025250     91400   18.7600 -111.4300      16.4        83       121        60
OIR    2025250     91400   18.7600 -111.4400      16.3        83       124        60
OIR    2025250     91400   18.7600 -111.4500      16.1        83       127        60
OIR    2025250     91400   18.7600 -111.4600      15.8        83       129        60
OIR    2025250     91400   18.7600 -111.4700      15.6        82       130        60
OIR    2025250     91400   18.7600 -111.4800      15.4        82       129        60
OIR    2025250     91400   18.7600 -111.4900      15.4        82       124        60
OIR    2025250     91400   18.7600 -111.5000      15.3        82       121        60
OIR    2025250     91400   18.7600 -111.5100      15.2        82       122        60
OIR    2025250     91400   18.7600 -111.5200      15.1        82       124        60
OIR    2025250     91400   18.7600 -111.5300      15.0        81       128        60
OIR    2025250     91400   18.7600 -111.5400      14.6        79       135        60
OIR    2025250     91400   18.7600 -111.5500      14.1        77       141        60
OIR    2025250     91400   18.7600 -111.5600      13.8        75       141        60
OIR    2025250     91400   18.7600 -111.5700      13.7        74       142        60
OIR    2025250     91400   18.7600 -113.2200       7.5       146       142        60
OIR    2025250     91400   18.7600 -113.2300       7.5       146       140        60
OIR    2025250     91400   18.7600 -113.2400       7.4       147       140        60
OIR    2025250     91400   18.7600 -113.2500       7.4       147       140        60
OIR    2025250     91400   18.7600 -113.2600       7.3       147       138        60
OIR    2025250     91400   18.7600 -113.2700       7.3       147       137        60
OIR    2025250     91400   18.7600 -113.2800       7.3       147       137        60
OIR    2025250     91400   18.7600 -113.2900       7.3       147       137        60
OIR    2025250     91400   18.7600 -113.3000       7.3       148       136        60
OIR    2025250     91400   18.7600 -113.3100       7.2       149       133        60
OIR    2025250     91400   18.7600 -113.3200       7.1       152       131        60
OIR    2025250     91400   18.7600 -113.3300       7.0       155       127        60
OIR    2025250     91400   18.7600 -113.3400       6.9       157       124        60
OIR    2025250     91400   18.7600 -113.3500       6.9       157       125        60
OIR    2025250     91400   18.7600 -113.3600       6.9       158       126        60
OIR    2025250     91400   18.7600 -113.3700       6.9       158       128        60
OIR    2025250     91400   18.7600 -113.3800       6.9       158       130        60
OIR    2025250     91400   18.7600 -113.3900       7.0       158       134        60
OIR    2025250     91400   18.7600 -113.4000       7.0       159       139        60
OIR    2025250     91400   18.7600 -113.4700       9.3       167       140        60
OIR    2025250     91400   18.7600 -113.4800       9.4       168       135        60
OIR    2025250     91400   18.7600 -113.4900       9.5       169       135        60
OIR    2025250     91400   18.7600 -113.5000       9.6       169       134        60
OIR    2025250     91400   18.7600 -113.5100       9.7       170       133        60
OIR    2025250     91400   18.7600 -113.5200       9.8       171       132        60
OIR    2025250     91400   18.7600 -113.5300       9.8       171       130        60
OIR    2025250     91400   18.7600 -113.5400       9.8       171       128        60
OIR    2025250     91400   18.7600 -113.5500       9.8       172       126        60
OIR    2025250     91400   18.7600 -113.5600       9.9       172       126        60
OIR    2025250     91400   18.7600 -113.5700      10.1       173       125        60
OIR    2025250     91400   18.7600 -113.5800      10.5       177       126        60
OIR    2025250     91400   18.7600 -113.5900      10.8       179       128        60
OIR    2025250     91400   18.7600 -113.6000      10.9       180       129        60
OIR    2025250     91400   18.7600 -113.6100      11.1       181       130        60
OIR    2025250     91400   18.7600 -113.6200      11.2       182       132        60
OIR    2025250     91400   18.7600 -113.6300      11.3       183       134        60
OIR    2025250     91400   18.7600 -113.6400      11.4       183       136        60
OIR    2025250     91400   18.7600 -113.6500      11.5       183       135        60
OIR    2025250     91400   18.7600 -113.6600      11.5       184       134        60
OIR    2025250     91400   18.7600 -113.6700      11.6       184       131        60
OIR    2025250     91400   18.7600 -113.6800      11.8       184       127        60
OIR    2025250     91400   18.7600 -113.6900      11.9       184       126        60
OIR    2025250     91400   18.7600 -113.7000      12.0       184       126        60
OIR    2025250     91400   18.7600 -113.7100      12.2       184       128        60
OIR    2025250     91400   18.7600 -113.7200      12.5       184       131        60
OIR    2025250     91400   18.7600 -113.7300      13.3       185       133        60
OIR    2025250     91400   18.7600 -113.7400      13.9       185       132        60
OIR    2025250     91400   18.7600 -113.7500      14.5       185       132        60
OIR    2025250     91400   18.7600 -113.7600      14.9       186       130        60
OIR    2025250     91400   18.7600 -113.7700      15.1       186       128        60
OIR    2025250     91400   18.7600 -113.7800      15.2       186       128        60
OIR    2025250     91400   18.7600 -113.7900      15.2       186       128        60
OIR    2025250     91400   18.7600 -113.8000      15.2       186       128        60
OIR    2025250     91400   18.7600 -113.8100      15.0       186       128        60
OIR    2025250     91400   18.7600 -113.8200      14.5       187       128        60
OIR    2025250     91400   18.7600 -113.8300      14.0       187       127        60
OIR    2025250     91400   18.7600 -113.8400      13.7       187       127        60
OIR    2025250     91400   18.7600 -113.8500      13.6       187       127        60
OIR    2025250     91400   18.7600 -113.8600      13.6       187       127        60
OIR    2025250     91400   18.7600 -113.8700      13.5       187       128        60
OIR    2025250     91400   18.7600 -113.8800      13.3       187       132        60
OIR    2025250     91400   18.7600 -113.8900      12.9       188       135        60
OIR    2025250     91400   18.7600 -113.9000      12.7       188       136        60
OIR    2025250     91400   18.7600 -113.9100      12.3       188       137        60
OIR    2025250     91400   18.7600 -113.9200      11.8       188       138        60
OIR    2025250     91400   18.7600 -113.9300      11.6       188       140        60
OIR    2025250     91400   18.7600 -113.9400      11.5       189       139        60
OIR    2025250     91400   18.7600 -113.9500      11.5       189       137        60
OIR    2025250     91400   18.7600 -113.9600      11.5       189       135        60
OIR    2025250     91400   18.7600 -113.9700      11.5       189       136        60
OIR    2025250     91400   18.7600 -113.9800      11.5       189       137        60
OIR    2025250     91400   18.7600 -113.9900      11.0       189       134        60
OIR    2025250     91400   18.7600 -114.0000      10.4       190       131        60
OIR    2025250     91400   18.7600 -114.0100      10.8       191       128        60
OIR    2025250     91400   18.7600 -114.0200      11.4       191       127        60
OIR    2025250     91400   18.7600 -114.0300      11.5       190       125        60
OIR    2025250     91400   18.7600 -114.0400      11.5       190       126        60
OIR    2025250     91400   18.7600 -114.0500      11.5       190       126        60
OIR    2025250     91400   18.7600 -114.0600      11.5       190       129        60
OIR    2025250     91400   18.7600 -114.0700      11.5       190       132        60
OIR    2025250     91400   18.7600 -114.0800      11.5       190       132        60
OIR    2025250     91400   18.7600 -114.0900      11.6       190       131        60
OIR    2025250     91400   18.7600 -114.1000      11.6       190       131        60
OIR    2025250     91400   18.7600 -114.1100      11.5       190       131        60
OIR    2025250     91400   18.7600 -114.1200      11.4       191       131        60
OIR    2025250     91400   18.7600 -114.1300      11.1       194       131        60
OIR    2025250     91400   18.7600 -114.1400      11.0       204       131        60
OIR    2025250     91400   18.7600 -114.1500      11.1       206       138        60
OIR    2025250     91400   18.7500 -110.3900      13.8        56       142        60
OIR    2025250     91400   18.7500 -110.4000      14.2        56       141        60
OIR    2025250     91400   18.7500 -110.4100      14.2        56       138        60
OIR    2025250     91400   18.7500 -110.4200      14.2        56       135        60
OIR    2025250     91400   18.7500 -110.4300      14.2        56       132        60
OIR    2025250     91400   18.7500 -110.4400      14.3        56       130        60
OIR    2025250     91400   18.7500 -110.4500      14.3        56       129        60
OIR    2025250     91400   18.7500 -110.4600      14.3        56       128        60
OIR    2025250     91400   18.7500 -110.4700      14.3        56       127        60
OIR    2025250     91400   18.7500 -110.4800      14.3        57       126        60
OIR    2025250     91400   18.7500 -110.4900      14.4        57       125        60
OIR    2025250     91400   18.7500 -110.5000      14.5        57       124        60
OIR    2025250     91400   18.7500 -110.5100      14.7        57       122        60
OIR    2025250     91400   18.7500 -110.5200      15.1        57       121        60
OIR    2025250     91400   18.7500 -110.5300      15.6        58       120        60
OIR    2025250     91400   18.7500 -110.5400      15.9        58       120        60
OIR    2025250     91400   18.7500 -110.5500      16.2        58       120        60
OIR    2025250     91400   18.7500 -110.5600      16.4        58       121        60
OIR    2025250     91400   18.7500 -110.5700      16.5        58       122        60
OIR    2025250     91400   18.7500 -110.5800      16.8        58       125        60
OIR    2025250     91400   18.7500 -110.5900      17.2        59       130        60
OIR    2025250     91400   18.7500 -110.6000      17.4        59       135        60
OIR    2025250     91400   18.7500 -111.4000      17.0        82       139        60
OIR    2025250     91400   18.7500 -111.4100      16.9        82       133        60
OIR    2025250     91400   18.7500 -111.4200      16.8        82       129        60
OIR    2025250     91400   18.7500 -111.4300      16.7        82       126        60
OIR    2025250     91400   18.7500 -111.4400      16.5        82       127        60
OIR    2025250     91400   18.7500 -111.4500      16.4        82       128        60
OIR    2025250     91400   18.7500 -111.4600      16.0        82       129        60
OIR    2025250     91400   18.7500 -111.4700      15.7        82       130        60
OIR    2025250     91400   18.7500 -111.4800      15.5        82       131        60
OIR    2025250     91400   18.7500 -111.4900      15.4        81       131        60
OIR    2025250     91400   18.7500 -111.5000      15.3        81       130        60
OIR    2025250     91400   18.7500 -111.5100      15.2        81       130        60
OIR    2025250     91400   18.7500 -111.5200      15.0        81       130        60
OIR    2025250     91400   18.7500 -111.5300      14.7        80       131        60
OIR    2025250     91400   18.7500 -111.5400      14.4        78       137        60
OIR    2025250     91400   18.7500 -113.2300       7.5       146       143        60
OIR    2025250     91400   18.7500 -113.2600       7.4       147       141        60
OIR    2025250     91400   18.7500 -113.2700       7.4       147       134        60
OIR    2025250     91400   18.7500 -113.2800       7.4       147       134        60
OIR    2025250     91400   18.7500 -113.2900       7.4       147       135        60
OIR    2025250     91400   18.7500 -113.3000       7.4       148       136        60
OIR    2025250     91400   18.7500 -113.3100       7.3       149       136        60
OIR    2025250     91400   18.7500 -113.3200       7.2       150       137        60
OIR    2025250     91400   18.7500 -113.3300       7.1       154       132        60
OIR    2025250     91400   18.7500 -113.3400       7.0       156       125        60
OIR    2025250     91400   18.7500 -113.3500       7.0       157       125        60
OIR    2025250     91400   18.7500 -113.3600       7.0       157       126        60
OIR    2025250     91400   18.7500 -113.3700       7.0       158       130        60
OIR    2025250     91400   18.7500 -113.3800       7.0       158       136        60
OIR    2025250     91400   18.7500 -113.3900       7.2       159       140        60
OIR    2025250     91400   18.7500 -113.4700       9.4       167       140        60
OIR    2025250     91400   18.7500 -113.4800       9.4       168       135        60
OIR    2025250     91400   18.7500 -113.4900       9.5       168       135        60
OIR    2025250     91400   18.7500 -113.5000       9.6       169       136        60
OIR    2025250     91400   18.7500 -113.5100       9.7       170       136        60
OIR    2025250     91400   18.7500 -113.5200       9.7       171       136        60
OIR    2025250     91400   18.7500 -113.5300       9.8       171       136        60
OIR    2025250     91400   18.7500 -113.5400       9.8       171       134        60
OIR    2025250     91400   18.7500 -113.5500       9.8       172       132        60
OIR    2025250     91400   18.7500 -113.5600       9.9       173       129        60
OIR    2025250     91400   18.7500 -113.5700      10.0       174       126        60
OIR    2025250     91400   18.7500 -113.5800      10.5       177       128        60
OIR    2025250     91400   18.7500 -113.5900      10.8       179       130        60
OIR    2025250     91400   18.7500 -113.6000      11.0       180       130        60
OIR    2025250     91400   18.7500 -113.6100      11.1       182       130        60
OIR    2025250     91400   18.7500 -113.6200      11.2       183       131        60
OIR    2025250     91400   18.7500 -113.6300      11.3       183       133        60
OIR    2025250     91400   18.7500 -113.6400      11.4       183       136        60
OIR    2025250     91400   18.7500 -113.6500      11.4       184       135        60
OIR    2025250     91400   18.7500 -113.6600      11.5       184       134        60
OIR    2025250     91400   18.7500 -113.6700      11.6       184       133        60
OIR    2025250     91400   18.7500 -113.6800      11.7       184       130        60
OIR    2025250     91400   18.7500 -113.6900      11.8       184       128        60
OIR    2025250     91400   18.7500 -113.7000      11.9       184       126        60
OIR    2025250     91400   18.7500 -113.7100      12.1       184       127        60
OIR    2025250     91400   18.7500 -113.7200      12.5       185       132        60
OIR    2025250     91400   18.7500 -113.7300      13.2       186       137        60
OIR    2025250     91400   18.7500 -113.7400      14.1       186       135        60
OIR    2025250     91400   18.7500 -113.7500      14.8       186       133        60
OIR    2025250     91400   18.7500 -113.7600      15.1       186       131        60
OIR    2025250     91400   18.7500 -113.7700      15.2       186       129        60
OIR    2025250     91400   18.7500 -113.7800      15.2       186       127        60
OIR    2025250     91400   18.7500 -113.7900      15.2       186       128        60
OIR    2025250     91400   18.7500 -113.8000      15.2       186       129        60
OIR    2025250     91400   18.7500 -113.8100      15.1       186       129        60
OIR    2025250     91400   18.7500 -113.8200      14.6       187       129        60
OIR    2025250     91400   18.7500 -113.8300      14.1       187       127        60
OIR    2025250     91400   18.7500 -113.8400      13.8       187       125        60
OIR    2025250     91400   18.7500 -113.8500      13.7       187       125        60
OIR    2025250     91400   18.7500 -113.8600      13.6       187       126        60
OIR    2025250     91400   18.7500 -113.8700      13.5       187       127        60
OIR    2025250     91400   18.7500 -113.8800      13.2       188       134        60
OIR    2025250     91400   18.7500 -113.8900      12.9       188       141        60
OIR    2025250     91400   18.7500 -113.9500      11.5       188       141        60
OIR    2025250     91400   18.7500 -113.9600      11.5       189       135        60
OIR    2025250     91400   18.7500 -113.9700      11.6       189       141        60
OIR    2025250     91400   18.7500 -114.0000       8.7       191       140        60
OIR    2025250     91400   18.7500 -114.0100       6.9       187       136        60
OIR    2025250     91400   18.7500 -114.0200       7.2       189       131        60
OIR    2025250     91400   18.7500 -114.0300      10.5       190       125        60
OIR    2025250     91400   18.7500 -114.0400      11.5       189       126        60
OIR    2025250     91400   18.7500 -114.0500      11.6       189       127        60
OIR    2025250     91400   18.7500 -114.0600      11.4       188       128        60
OIR    2025250     91400   18.7500 -114.0700      11.4       188       130        60
OIR    2025250     91400   18.7500 -114.0800      11.5       189       130        60
OIR    2025250     91400   18.7500 -114.0900      11.5       190       129        60
OIR    2025250     91400   18.7500 -114.1000      11.5       190       128        60
OIR    2025250     91400   18.7500 -114.1100      11.3       190       128        60
OIR    2025250     91400   18.7500 -114.1200      11.0       191       128        60
OIR    2025250     91400   18.7500 -114.1300      10.6       193       129        60
OIR    2025250     91400   18.7500 -114.1400      10.4       204       130        60
OIR    2025250     91400   18.7500 -114.1500      10.5       206       135        60
OIR    2025250     91400   18.7400 -110.3900      13.6        56       141        60
OIR    2025250     91400   18.7400 -110.4000      14.2        56       141        60
OIR    2025250     91400   18.7400 -110.4100      14.2        56       141        60
OIR    2025250     91400   18.7400 -110.4200      14.3        56       138        60
OIR    2025250     91400   18.7400 -110.4300      14.3        56       134        60
OIR    2025250     91400   18.7400 -110.4400      14.3        56       132        60
OIR    2025250     91400   18.7400 -110.4500      14.3        56       131        60
OIR    2025250     91400   18.7400 -110.4600      14.3        56       129        60
OIR    2025250     91400   18.7400 -110.4700      14.3        56       126        60
OIR    2025250     91400   18.7400 -110.4800      14.3        56       123        60
OIR    2025250     91400   18.7400 -110.4900      14.4        57       123        60
OIR    2025250     91400   18.7400 -110.5000      14.4        57       123        60
OIR    2025250     91400   18.7400 -110.5100      14.6        57       123        60
OIR    2025250     91400   18.7400 -110.5200      15.0        57       121        60
OIR    2025250     91400   18.7400 -110.5300      15.4        57       120        60
OIR    2025250     91400   18.7400 -110.5400      15.8        57       120        60
OIR    2025250     91400   18.7400 -110.5500      16.2        57       120        60
OIR    2025250     91400   18.7400 -110.5600      16.4        57       120        60
OIR    2025250     91400   18.7400 -110.5700      16.6        57       122        60
OIR    2025250     91400   18.7400 -110.5800      16.9        57       124        60
OIR    2025250     91400   18.7400 -110.5900      17.3        56       130        60
OIR    2025250     91400   18.7400 -110.6000      17.7        56       137        60
OIR    2025250     91400   18.7400 -111.3900      17.4        82       142        60
OIR    2025250     91400   18.7400 -111.4000      17.2        82       137        60
OIR    2025250     91400   18.7400 -111.4100      17.1        82       132        60
OIR    2025250     91400   18.7400 -111.4200      17.0        82       131        60
OIR    2025250     91400   18.7400 -111.4300      16.8        82       130        60
OIR    2025250     91400   18.7400 -111.4400      16.7        82       129        60
OIR    2025250     91400   18.7400 -111.4500      16.6        82       129        60
OIR    2025250     91400   18.7400 -111.4600      16.2        82       129        60
OIR    2025250     91400   18.7400 -111.4700      15.8        81       130        60
OIR    2025250     91400   18.7400 -111.4800      15.5        81       131        60
OIR    2025250     91400   18.7400 -111.4900      15.4        81       135        60
OIR    2025250     91400   18.7400 -111.5000      15.3        81       138        60
OIR    2025250     91400   18.7400 -111.5100      15.2        81       139        60
OIR    2025250     91400   18.7400 -111.5200      15.0        80       137        60
OIR    2025250     91400   18.7400 -111.5300      14.7        79       135        60
OIR    2025250     91400   18.7400 -111.5400      14.4        78       139        60
OIR    2025250     91400   18.7400 -113.2300       7.6       146       143        60
OIR    2025250     91400   18.7400 -113.2700       7.4       147       138        60
OIR    2025250     91400   18.7400 -113.2800       7.4       147       135        60
OIR    2025250     91400   18.7400 -113.2900       7.4       147       134        60
OIR    2025250     91400   18.7400 -113.3000       7.4       148       135        60
OIR    2025250     91400   18.7400 -113.3100       7.4       149       138        60
OIR    2025250     91400   18.7400 -113.3200       7.3       149       140        60
OIR    2025250     91400   18.7400 -113.3300       7.3       151       135        60
OIR    2025250     91400   18.7400 -113.3400       7.2       154       128        60
OIR    2025250     91400   18.7400 -113.3500       7.1       156       126        60
OIR    2025250     91400   18.7400 -113.3600       7.0       157       129        60
OIR    2025250     91400   18.7400 -113.3700       7.1       157       132        60
OIR    2025250     91400   18.7400 -113.3800       7.3       158       140        60
OIR    2025250     91400   18.7400 -113.4700       9.4       167       140        60
OIR    2025250     91400   18.7400 -113.4800       9.4       168       135        60
OIR    2025250     91400   18.7400 -113.4900       9.4       168       136        60
OIR    2025250     91400   18.7400 -113.5000       9.5       169       138        60
OIR    2025250     91400   18.7400 -113.5100       9.6       170       140        60
OIR    2025250     91400   18.7400 -113.5200       9.7       171       141        60
OIR    2025250     91400   18.7400 -113.5300       9.7       171       141        60
OIR    2025250     91400   18.7400 -113.5400       9.8       172       140        60
OIR    2025250     91400   18.7400 -113.5500       9.8       172       139        60
OIR    2025250     91400   18.7400 -113.5600       9.9       173       135        60
OIR    2025250     91400   18.7400 -113.5700      10.0       174       131        60
OIR    2025250     91400   18.7400 -113.5800      10.3       176       130        60
OIR    2025250     91400   18.7400 -113.5900      10.7       180       132        60
OIR    2025250     91400   18.7400 -113.6000      11.0       181       132        60
OIR    2025250     91400   18.7400 -113.6100      11.1       182       130        60
OIR    2025250     91400   18.7400 -113.6200      11.2       183       129        60
OIR    2025250     91400   18.7400 -113.6300      11.3       183       131        60
OIR    2025250     91400   18.7400 -113.6400      11.3       184       133        60
OIR    2025250     91400   18.7400 -113.6500      11.4       184       132        60
OIR    2025250     91400   18.7400 -113.6600      11.5       184       130        60
OIR    2025250     91400   18.7400 -113.6700      11.5       184       129        60
OIR    2025250     91400   18.7400 -113.6800      11.6       185       131        60
OIR    2025250     91400   18.7400 -113.6900      11.7       185       132        60
OIR    2025250     91400   18.7400 -113.7000      11.8       185       129        60
OIR    2025250     91400   18.7400 -113.7100      12.0       185       125        60
OIR    2025250     91400   18.7400 -113.7200      12.3       186       134        60
OIR    2025250     91400   18.7400 -113.7300      12.8       186       142        60
OIR    2025250     91400   18.7400 -113.7400      13.9       187       140        60
OIR    2025250     91400   18.7400 -113.7500      14.9       186       136        60
OIR    2025250     91400   18.7400 -113.7600      15.1       186       133        60
OIR    2025250     91400   18.7400 -113.7700      15.2       186       132        60
OIR    2025250     91400   18.7400 -113.7800      15.2       186       131        60
OIR    2025250     91400   18.7400 -113.7900      15.2       186       131        60
OIR    2025250     91400   18.7400 -113.8000      15.2       186       132        60
OIR    2025250     91400   18.7400 -113.8100      14.8       186       133        60
OIR    2025250     91400   18.7400 -113.8200      14.1       187       134        60
OIR    2025250     91400   18.7400 -113.8300      13.8       187       135        60
OIR    2025250     91400   18.7400 -113.8400      13.7       187       134        60
OIR    2025250     91400   18.7400 -113.8500      13.6       187       134        60
OIR    2025250     91400   18.7400 -113.8600      13.6       187       134        60
OIR    2025250     91400   18.7400 -113.8700      13.4       188       134        60
OIR    2025250     91400   18.7400 -113.8800      13.1       189       136        60
OIR    2025250     91400   18.7400 -113.8900      12.9       189       139        60
OIR    2025250     91400   18.7400 -113.9600      11.5       188       141        60
OIR    2025250     91400   18.7400 -114.0200       6.0       176       136        60
OIR    2025250     91400   18.7400 -114.0300       6.7       170       128        60
OIR    2025250     91400   18.7400 -114.0400       7.8       173       128        60
OIR    2025250     91400   18.7400 -114.0500       8.5       175       129        60
OIR    2025250     91400   18.7400 -114.0600       9.3       177       129        60
OIR    2025250     91400   18.7400 -114.0700      10.5       182       129        60
OIR    2025250     91400   18.7400 -114.0800      11.2       187       128        60
OIR    2025250     91400   18.7400 -114.0900      11.3       189       127        60
OIR    2025250     91400   18.7400 -114.1000      11.2       190       127        60
OIR    2025250     91400   18.7400 -114.1100      10.3       193       126        60
OIR    2025250     91400   18.7400 -114.1200       9.8       195       126        60
OIR    2025250     91400   18.7400 -114.1300       9.6       196       128        60
OIR    2025250     91400   18.7400 -114.1400       9.9       204       129        60
OIR    2025250     91400   18.7400 -114.1500      10.0       205       133        60
OIR    2025250     91400   18.7400 -114.1600      10.2       205       142        60
OIR    2025250     91400   18.7300 -110.3900      13.6        56       142        60
OIR    2025250     91400   18.7300 -110.4200      14.3        56       140        60
OIR    2025250     91400   18.7300 -110.4300      14.3        56       136        60
OIR    2025250     91400   18.7300 -110.4400      14.3        56       132        60
OIR    2025250     91400   18.7300 -110.4500      14.3        56       132        60
OIR    2025250     91400   18.7300 -110.4600      14.3        56       131        60
OIR    2025250     91400   18.7300 -110.4700      14.3        56       127        60
OIR    2025250     91400   18.7300 -110.4800      14.3        56       122        60
OIR    2025250     91400   18.7300 -110.4900      14.4        56       121        60
OIR    2025250     91400   18.7300 -110.5000      14.4        56       122        60
OIR    2025250     91400   18.7300 -110.5100      14.5        56       122        60
OIR    2025250     91400   18.7300 -110.5200      14.7        57       121        60
OIR    2025250     91400   18.7300 -110.5300      15.2        57       120        60
OIR    2025250     91400   18.7300 -110.5400      15.7        57       120        60
OIR    2025250     91400   18.7300 -110.5500      16.2        57       120        60
OIR    2025250     91400   18.7300 -110.5600      16.4        57       120        60
OIR    2025250     91400   18.7300 -110.5700      16.7        56       121        60
OIR    2025250     91400   18.7300 -110.5800      17.0        56       122        60
OIR    2025250     91400   18.7300 -110.5900      17.5        55       131        60
OIR    2025250     91400   18.7300 -110.6000      17.9        54       141        60
OIR    2025250     91400   18.7300 -111.3900      17.6        81       138        60
OIR    2025250     91400   18.7300 -111.4000      17.3        82       135        60
OIR    2025250     91400   18.7300 -111.4100      17.2        82       132        60
OIR    2025250     91400   18.7300 -111.4200      17.0        82       131        60
OIR    2025250     91400   18.7300 -111.4300      16.9        82       130        60
OIR    2025250     91400   18.7300 -111.4400      16.8        82       130        60
OIR    2025250     91400   18.7300 -111.4500      16.7        81       130        60
OIR    2025250     91400   18.7300 -111.4600      16.5        81       130        60
OIR    2025250     91400   18.7300 -111.4700      15.9        81       132        60
OIR    2025250     91400   18.7300 -111.4800      15.6        81       134        60
OIR    2025250     91400   18.7300 -111.4900      15.4        81       136        60
OIR    2025250     91400   18.7300 -111.5000      15.3        80       139        60
OIR    2025250     91400   18.7300 -111.5100      15.2        80       141        60
OIR    2025250     91400   18.7300 -111.5200      14.9        80       141        60
OIR    2025250     91400   18.7300 -111.5300      14.7        79       141        60
OIR    2025250     91400   18.7300 -111.8400      12.2        69       143        60
OIR    2025250     91400   18.7300 -113.2000       7.6       146       144        60
OIR    2025250     91400   18.7300 -113.2100       7.6       146       140        60
OIR    2025250     91400   18.7300 -113.2200       7.6       146       141        60
OIR    2025250     91400   18.7300 -113.2300       7.6       147       142        60
OIR    2025250     91400   18.7300 -113.2400       7.5       147       143        60
OIR    2025250     91400   18.7300 -113.2700       7.5       147       142        60
OIR    2025250     91400   18.7300 -113.2800       7.5       147       139        60
OIR    2025250     91400   18.7300 -113.2900       7.4       148       136        60
OIR    2025250     91400   18.7300 -113.3000       7.4       148       134        60
OIR    2025250     91400   18.7300 -113.3100       7.4       149       138        60
OIR    2025250     91400   18.7300 -113.3200       7.4       149       141        60
OIR    2025250     91400   18.7300 -113.3300       7.4       150       137        60
OIR    2025250     91400   18.7300 -113.3400       7.3       152       131        60
OIR    2025250     91400   18.7300 -113.3500       7.2       154       127        60
OIR    2025250     91400   18.7300 -113.3600       7.3       155       133        60
OIR    2025250     91400   18.7300 -113.3700       7.4       157       138        60
OIR    2025250     91400   18.7300 -113.4700       9.3       167       142        60
OIR    2025250     91400   18.7300 -113.4800       9.4       168       141        60
OIR    2025250     91400   18.7300 -113.4900       9.4       168       139        60
OIR    2025250     91400   18.7300 -113.5000       9.4       168       138        60
OIR    2025250     91400   18.7300 -113.5100       9.5       169       138        60
OIR    2025250     91400   18.7300 -113.5200       9.6       170       139        60
OIR    2025250     91400   18.7300 -113.5300       9.7       171       140        60
OIR    2025250     91400   18.7300 -113.5400       9.7       172       140        60
OIR    2025250     91400   18.7300 -113.5500       9.8       173       139        60
OIR    2025250     91400   18.7300 -113.5600       9.9       173       137        60
OIR    2025250     91400   18.7300 -113.5700      10.0       175       133        60
OIR    2025250     91400   18.7300 -113.5800      10.2       176       131        60
OIR    2025250     91400   18.7300 -113.5900      10.5       179       132        60
OIR    2025250     91400   18.7300 -113.6000      10.9       182       133        60
OIR    2025250     91400   18.7300 -113.6100      11.1       183       132        60
OIR    2025250     91400   18.7300 -113.6200      11.2       183       131        60
OIR    2025250     91400   18.7300 -113.6300      11.2       184       132        60
OIR    2025250     91400   18.7300 -113.6400      11.3       184       133        60
OIR    2025250     91400   18.7300 -113.6500      11.3       184       131        60
OIR    2025250     91400   18.7300 -113.6600      11.4       184       129        60
OIR    2025250     91400   18.7300 -113.6700      11.4       185       128        60
OIR    2025250     91400   18.7300 -113.6800      11.5       185       132        60
OIR    2025250     91400   18.7300 -113.6900      11.6       185       135        60
OIR    2025250     91400   18.7300 -113.7000      11.7       185       132        60
OIR    2025250     91400   18.7300 -113.7100      11.8       185       127        60
OIR    2025250     91400   18.7300 -113.7200      12.0       186       132        60
OIR    2025250     91400   18.7300 -113.7300      12.2       186       142        60
OIR    2025250     91400   18.7300 -113.7500      14.8       186       140        60
OIR    2025250     91400   18.7300 -113.7600      15.1       186       137        60
OIR    2025250     91400   18.7300 -113.7700      15.2       186       137        60
OIR    2025250     91400   18.7300 -113.7800      15.2       186       136        60
OIR    2025250     91400   18.7300 -113.7900      15.2       185       135        60
OIR    2025250     91400   18.7300 -113.8000      15.2       185       135        60
OIR    2025250     91400   18.7300 -113.8100      14.4       186       136        60
OIR    2025250     91400   18.7300 -113.8200      13.7       186       139        60
OIR    2025250     91400   18.7300 -113.8300      13.6       187       141        60
OIR    2025250     91400   18.7300 -113.8700      13.3       189       142        60
OIR    2025250     91400   18.7300 -113.8800      13.0       190       139        60
OIR    2025250     91400   18.7300 -113.8900      12.8       190       137        60
OIR    2025250     91400   18.7300 -114.0200       6.3       173       142        60
OIR    2025250     91400   18.7300 -114.0300       7.3       171       133        60
OIR    2025250     91400   18.7300 -114.0400       8.2       173       130        60
OIR    2025250     91400   18.7300 -114.0500       8.5       174       133        60
OIR    2025250     91400   18.7300 -114.0600       8.7       175       133        60
OIR    2025250     91400   18.7300 -114.0700       9.3       180       131        60
OIR    2025250     91400   18.7300 -114.0800      10.4       185       129        60
OIR    2025250     91400   18.7300 -114.0900      10.9       188       128        60
OIR    2025250     91400   18.7300 -114.1000      10.7       190       126        60
OIR    2025250     91400   18.7300 -114.1100      10.1       192       126        60
OIR    2025250     91400   18.7300 -114.1200       9.7       194       126        60
OIR    2025250     91400   18.7300 -114.1300       9.5       195       129        60
OIR    2025250     91400   18.7300 -114.1400       9.7       203       132        60
OIR    2025250     91400   18.7300 -114.1500       9.8       204       137        60
OIR    2025250     91400   18.7200 -110.4200      14.3        56       141        60
OIR    2025250     91400   18.7200 -110.4300      14.3        56       137        60
OIR    2025250     91400   18.7200 -110.4400      14.3        56       133        60
OIR    2025250     91400   18.7200 -110.4500      14.3        56       131        60
OIR    2025250     91400   18.7200 -110.4600      14.3        56       130        60
OIR    2025250     91400   18.7200 -110.4700      14.3        56       127        60
OIR    2025250     91400   18.7200 -110.4800      14.3        56       125        60
OIR    2025250     91400   18.7200 -110.4900      14.4        56       123        60
OIR    2025250     91400   18.7200 -110.5000      14.4        56       122        60
OIR    2025250     91400   18.7200 -110.5100      14.4        56       122        60
OIR    2025250     91400   18.7200 -110.5200      14.6        56       122        60
OIR    2025250     91400   18.7200 -110.5300      14.9        56       122        60
OIR    2025250     91400   18.7200 -110.5400      15.4        56       121        60
OIR    2025250     91400   18.7200 -110.5500      16.1        56       121        60
OIR    2025250     91400   18.7200 -110.5600      16.3        56       121        60
OIR    2025250     91400   18.7200 -110.5700      16.7        56       121        60
OIR    2025250     91400   18.7200 -110.5800      17.3        55       122        60
OIR    2025250     91400   18.7200 -110.5900      17.6        54       128        60
OIR    2025250     91400   18.7200 -110.6000      17.9        54       136        60
OIR    2025250     91400   18.7200 -110.6100      18.0        53       141        60
OIR    2025250     91400   18.7200 -111.3900      17.7        81       137        60
OIR    2025250     91400   18.7200 -111.4000      17.5        81       135        60
OIR    2025250     91400   18.7200 -111.4100      17.2        82       134        60
OIR    2025250     91400   18.7200 -111.4200      17.1        82       132        60
OIR    2025250     91400   18.7200 -111.4300      17.0        81       131        60
OIR    2025250     91400   18.7200 -111.4400      17.0        81       130        60
OIR    2025250     91400   18.7200 -111.4500      16.9        81       131        60
OIR    2025250     91400   18.7200 -111.4600      16.7        81       131        60
OIR    2025250     91400   18.7200 -111.4700      16.1        81       133        60
OIR    2025250     91400   18.7200 -111.4800      15.6        80       136        60
OIR    2025250     91400   18.7200 -111.4900      15.5        80       138        60
OIR    2025250     91400   18.7200 -111.5000      15.3        80       140        60
OIR    2025250     91400   18.7200 -111.5100      15.2        80       142        60
OIR    2025250     91400   18.7200 -113.2100       7.6       146       141        60
OIR    2025250     91400   18.7200 -113.2200       7.6       146       142        60
OIR    2025250     91400   18.7200 -113.2300       7.6       147       144        60
OIR    2025250     91400   18.7200 -113.2800       7.5       147       142        60
OIR    2025250     91400   18.7200 -113.2900       7.4       148       139        60
OIR    2025250     91400   18.7200 -113.3000       7.4       148       136        60
OIR    2025250     91400   18.7200 -113.3100       7.4       149       137        60
OIR    2025250     91400   18.7200 -113.3200       7.4       149       140        60
OIR    2025250     91400   18.7200 -113.3300       7.4       149       138        60
OIR    2025250     91400   18.7200 -113.3400       7.4       150       133        60
OIR    2025250     91400   18.7200 -113.3500       7.4       152       129        60
OIR    2025250     91400   18.7200 -113.3600       7.5       154       136        60
OIR    2025250     91400   18.7200 -113.3700       7.6       156       142        60
OIR    2025250     91400   18.7200 -113.4600       9.3       167       143        60
OIR    2025250     91400   18.7200 -113.4700       9.3       168       143        60
OIR    2025250     91400   18.7200 -113.5000       9.4       169       140        60
OIR    2025250     91400   18.7200 -113.5100       9.5       169       137        60
OIR    2025250     91400   18.7200 -113.5200       9.6       170       138        60
OIR    2025250     91400   18.7200 -113.5300       9.7       171       140        60
OIR    2025250     91400   18.7200 -113.5400       9.7       172       139        60
OIR    2025250     91400   18.7200 -113.5500       9.8       173       138        60
OIR    2025250     91400   18.7200 -113.5600       9.9       174       136        60
OIR    2025250     91400   18.7200 -113.5700      10.0       175       134        60
OIR    2025250     91400   18.7200 -113.5800      10.2       177       131        60
OIR    2025250     91400   18.7200 -113.5900      10.4       179       132        60
OIR    2025250     91400   18.7200 -113.6000      10.8       183       132        60
OIR    2025250     91400   18.7200 -113.6100      11.0       183       133        60
OIR    2025250     91400   18.7200 -113.6200      11.1       184       133        60
OIR    2025250     91400   18.7200 -113.6300      11.2       184       133        60
OIR    2025250     91400   18.7200 -113.6400      11.2       184       133        60
OIR    2025250     91400   18.7200 -113.6500      11.3       184       133        60
OIR    2025250     91400   18.7200 -113.6600      11.3       185       132        60
OIR    2025250     91400   18.7200 -113.6700      11.4       185       132        60
OIR    2025250     91400   18.7200 -113.6800      11.4       185       134        60
OIR    2025250     91400   18.7200 -113.6900      11.5       185       136        60
OIR    2025250     91400   18.7200 -113.7000      11.6       185       134        60
OIR    2025250     91400   18.7200 -113.7100      11.7       186       130        60
OIR    2025250     91400   18.7200 -113.7200      11.8       186       131        60
OIR    2025250     91400   18.7200 -113.7300      11.9       186       137        60
OIR    2025250     91400   18.7200 -113.7400      12.6       186       142        60
OIR    2025250     91400   18.7200 -113.7900      15.2       185       141        60
OIR    2025250     91400   18.7200 -113.8000      15.0       185       139        60
OIR    2025250     91400   18.7200 -113.8100      14.0       187       138        60
OIR    2025250     91400   18.7200 -113.8200      12.9       188       141        60
OIR    2025250     91400   18.7200 -113.8900      12.5       191       139        60
OIR    2025250     91400   18.7200 -113.9000      11.4       192       142        60
OIR    2025250     91400   18.7200 -114.0400       8.4       175       140        60
OIR    2025250     91400   18.7200 -114.0500       8.5       175       141        60
OIR    2025250     91400   18.7200 -114.0600       8.6       175       141        60
OIR    2025250     91400   18.7200 -114.0700       9.2       180       136        60
OIR    2025250     91400   18.7200 -114.0800       9.9       183       131        60
OIR    2025250     91400   18.7200 -114.0900      10.1       185       129        60
OIR    2025250     91400   18.7200 -114.1000      10.1       189       127        60
OIR    2025250     91400   18.7200 -114.1100       9.8       191       127        60
OIR    2025250     91400   18.7200 -114.1200       9.2       194       127        60
OIR    2025250     91400   18.7200 -114.1300       8.9       194       130        60
OIR    2025250     91400   18.7200 -114.1400       8.8       196       136        60
OIR    2025250     91400   18.7200 -114.1500       9.1       198       142        60
OIR    2025250     91400   18.7100 -108.9600      40.9       108       141        60
OIR    2025250     91400   18.7100 -108.9700      42.2       108       145        60
OIR    2025250     91400   18.7100 -110.4300      14.3        56       139        60
OIR    2025250     91400   18.7100 -110.4400      14.3        56       134        60
OIR    2025250     91400   18.7100 -110.4500      14.3        56       131        60
OIR    2025250     91400   18.7100 -110.4600      14.3        56       129        60
OIR    2025250     91400   18.7100 -110.4700      14.3        56       127        60
OIR    2025250     91400   18.7100 -110.4800      14.3        56       126        60
OIR    2025250     91400   18.7100 -110.4900      14.4        56       125        60
OIR    2025250     91400   18.7100 -110.5000      14.4        56       123        60
OIR    2025250     91400   18.7100 -110.5100      14.4        56       122        60
OIR    2025250     91400   18.7100 -110.5200      14.5        56       122        60
OIR    2025250     91400   18.7100 -110.5300      14.7        56       122        60
OIR    2025250     91400   18.7100 -110.5400      15.2        56       123        60
OIR    2025250     91400   18.7100 -110.5500      15.9        56       123        60
OIR    2025250     91400   18.7100 -110.5600      16.2        55       122        60
OIR    2025250     91400   18.7100 -110.5700      16.7        55       122        60
OIR    2025250     91400   18.7100 -110.5800      17.5        54       122        60
OIR    2025250     91400   18.7100 -110.5900      17.8        54       125        60
OIR    2025250     91400   18.7100 -110.6000      17.9        54       132        60
OIR    2025250     91400   18.7100 -110.6100      18.0        54       138        60
OIR    2025250     91400   18.7100 -110.6200      18.2        53       140        60
OIR    2025250     91400   18.7100 -110.6300      18.4        54       142        60
OIR    2025250     91400   18.7100 -111.3900      17.8        81       141        60
OIR    2025250     91400   18.7100 -111.4000      17.6        82       139        60
OIR    2025250     91400   18.7100 -111.4100      17.3        82       137        60
OIR    2025250     91400   18.7100 -111.4200      17.2        81       136        60
OIR    2025250     91400   18.7100 -111.4300      17.1        81       135        60
OIR    2025250     91400   18.7100 -111.4400      17.1        81       134        60
OIR    2025250     91400   18.7100 -111.4500      17.0        81       134        60
OIR    2025250     91400   18.7100 -111.4600      16.9        81       135        60
OIR    2025250     91400   18.7100 -111.4700      16.2        80       136        60
OIR    2025250     91400   18.7100 -111.4800      15.7        80       138        60
OIR    2025250     91400   18.7100 -111.4900      15.5        80       140        60
OIR    2025250     91400   18.7100 -111.5000      15.4        80       143        60
OIR    2025250     91400   18.7100 -113.2100       7.6       146       143        60
OIR    2025250     91400   18.7100 -113.2900       7.5       148       143        60
OIR    2025250     91400   18.7100 -113.3000       7.4       148       140        60
OIR    2025250     91400   18.7100 -113.3100       7.4       149       138        60
OIR    2025250     91400   18.7100 -113.3200       7.4       149       137        60
OIR    2025250     91400   18.7100 -113.3300       7.4       149       136        60
OIR    2025250     91400   18.7100 -113.3400       7.4       150       133        60
OIR    2025250     91400   18.7100 -113.3500       7.5       151       132        60
OIR    2025250     91400   18.7100 -113.3600       7.6       153       138        60
OIR    2025250     91400   18.7100 -113.4400       9.2       166       140        60
OIR    2025250     91400   18.7100 -113.4500       9.3       167       141        60
OIR    2025250     91400   18.7100 -113.4600       9.3       167       143        60
OIR    2025250     91400   18.7100 -113.5000       9.4       169       141        60
OIR    2025250     91400   18.7100 -113.5100       9.4       169       135        60
OIR    2025250     91400   18.7100 -113.5200       9.5       170       136        60
OIR    2025250     91400   18.7100 -113.5300       9.6       171       136        60
OIR    2025250     91400   18.7100 -113.5400       9.7       173       136        60
OIR    2025250     91400   18.7100 -113.5500       9.8       173       135        60
OIR    2025250     91400   18.7100 -113.5600       9.8       174       134        60
OIR    2025250     91400   18.7100 -113.5700       9.9       175       131        60
OIR    2025250     91400   18.7100 -113.5800      10.1       177       129        60
OIR    2025250     91400   18.7100 -113.5900      10.4       180       129        60
OIR    2025250     91400   18.7100 -113.6000      10.8       183       130        60
OIR    2025250     91400   18.7100 -113.6100      10.9       184       131        60
OIR    2025250     91400   18.7100 -113.6200      11.0       184       133        60
OIR    2025250     91400   18.7100 -113.6300      11.1       184       133        60
OIR    2025250     91400   18.7100 -113.6400      11.2       184       133        60
OIR    2025250     91400   18.7100 -113.6500      11.2       185       133        60
OIR    2025250     91400   18.7100 -113.6600      11.3       185       134        60
OIR    2025250     91400   18.7100 -113.6700      11.4       185       135        60
OIR    2025250     91400   18.7100 -113.6800      11.4       186       135        60
OIR    2025250     91400   18.7100 -113.6900      11.5       186       135        60
OIR    2025250     91400   18.7100 -113.7000      11.5       186       135        60
OIR    2025250     91400   18.7100 -113.7100      11.6       186       133        60
OIR    2025250     91400   18.7100 -113.7200      11.6       186       131        60
OIR    2025250     91400   18.7100 -113.7300      11.7       186       134        60
OIR    2025250     91400   18.7100 -113.7400      12.0       186       138        60
OIR    2025250     91400   18.7100 -113.8100      12.9       188       141        60
OIR    2025250     91400   18.7100 -113.8900      12.4       191       142        60
OIR    2025250     91400   18.7100 -113.9000      11.9       191       139        60
OIR    2025250     91400   18.7100 -114.0700       9.1       179       142        60
OIR    2025250     91400   18.7100 -114.0800       9.8       183       133        60
OIR    2025250     91400   18.7100 -114.0900       9.9       183       130        60
OIR    2025250     91400   18.7100 -114.1000      10.0       187       131        60
OIR    2025250     91400   18.7100 -114.1100       9.6       188       131        60
OIR    2025250     91400   18.7100 -114.1200       8.9       192       132        60
OIR    2025250     91400   18.7100 -114.1300       8.6       194       135        60
OIR    2025250     91400   18.7100 -114.1400       8.7       195       142        60
OIR    2025250     91400   18.7000 -108.9600      38.0       109       135        60
OIR    2025250     91400   18.7000 -108.9700      39.0       108       119        60
OIR    2025250     91400   18.7000 -108.9800      37.4       105       145        60
OIR    2025250     91400   18.7000 -110.4300      14.3        56       141        60
OIR    2025250     91400   18.7000 -110.4400      14.3        56       135        60
OIR    2025250     91400   18.7000 -110.4500      14.3        56       132        60
OIR    2025250     91400   18.7000 -110.4600      14.3        56       129        60
OIR    2025250     91400   18.7000 -110.4700      14.3        56       127        60
OIR    2025250     91400   18.7000 -110.4800      14.3        56       126        60
OIR    2025250     91400   18.7000 -110.4900      14.4        56       125        60
OIR    2025250     91400   18.7000 -110.5000      14.4        56       124        60
OIR    2025250     91400   18.7000 -110.5100      14.4        56       123        60
OIR    2025250     91400   18.7000 -110.5200      14.4        56       122        60
OIR    2025250     91400   18.7000 -110.5300      14.5        56       122        60
OIR    2025250     91400   18.7000 -110.5400      14.9        56       122        60
OIR    2025250     91400   18.7000 -110.5500      15.7        56       122        60
OIR    2025250     91400   18.7000 -110.5600      16.2        55       122        60
OIR    2025250     91400   18.7000 -110.5700      16.8        54       123        60
OIR    2025250     91400   18.7000 -110.5800      17.6        54       124        60
OIR    2025250     91400   18.7000 -110.5900      17.8        54       125        60
OIR    2025250     91400   18.7000 -110.6000      17.9        54       130        60
OIR    2025250     91400   18.7000 -110.6100      18.0        54       135        60
OIR    2025250     91400   18.7000 -110.6200      18.1        54       138        60
OIR    2025250     91400   18.7000 -110.6300      18.3        54       141        60
OIR    2025250     91400   18.7000 -111.3900      17.9        82       142        60
OIR    2025250     91400   18.7000 -111.4000      17.7        82       140        60
OIR    2025250     91400   18.7000 -111.4100      17.4        81       140        60
OIR    2025250     91400   18.7000 -111.4200      17.3        81       141        60
OIR    2025250     91400   18.7000 -111.4300      17.2        81       139        60
OIR    2025250     91400   18.7000 -111.4400      17.1        81       138        60
OIR    2025250     91400   18.7000 -111.4500      17.1        81       137        60
OIR    2025250     91400   18.7000 -111.4600      17.0        81       138        60
OIR    2025250     91400   18.7000 -111.4700      16.4        80       139        60
OIR    2025250     91400   18.7000 -111.4800      15.8        80       141        60
OIR    2025250     91400   18.7000 -111.4900      15.6        80       142        60
OIR    2025250     91400   18.7000 -113.3000       7.4       148       142        60
OIR    2025250     91400   18.7000 -113.3100       7.4       149       140        60
OIR    2025250     91400   18.7000 -113.3200       7.4       149       137        60
OIR    2025250     91400   18.7000 -113.3300       7.4       149       134        60
OIR    2025250     91400   18.7000 -113.3400       7.5       150       134        60
OIR    2025250     91400   18.7000 -113.3500       7.5       151       133        60
OIR    2025250     91400   18.7000 -113.3600       7.8       153       138        60
OIR    2025250     91400   18.7000 -113.4400       9.2       166       138        60
OIR    2025250     91400   18.7000 -113.4500       9.2       167       139        60
OIR    2025250     91400   18.7000 -113.4600       9.3       167       142        60
OIR    2025250     91400   18.7000 -113.5000       9.4       169       142        60
OIR    2025250     91400   18.7000 -113.5100       9.4       169       136        60
OIR    2025250     91400   18.7000 -113.5200       9.5       170       133        60
OIR    2025250     91400   18.7000 -113.5300       9.6       172       133        60
OIR    2025250     91400   18.7000 -113.5400       9.6       173       133        60
OIR    2025250     91400   18.7000 -113.5500       9.7       174       132        60
OIR    2025250     91400   18.7000 -113.5600       9.8       175       130        60
OIR    2025250     91400   18.7000 -113.5700       9.8       176       128        60
OIR    2025250     91400   18.7000 -113.5800      10.0       178       126        60
OIR    2025250     91400   18.7000 -113.5900      10.4       181       127        60
OIR    2025250     91400   18.7000 -113.6000      10.8       184       127        60
OIR    2025250     91400   18.7000 -113.6100      10.9       184       129        60
OIR    2025250     91400   18.7000 -113.6200      10.9       184       130        60
OIR    2025250     91400   18.7000 -113.6300      11.0       184       131        60
OIR    2025250     91400   18.7000 -113.6400      11.0       185       132        60
OIR    2025250     91400   18.7000 -113.6500      11.1       185       133        60
OIR    2025250     91400   18.7000 -113.6600      11.2       185       136        60
OIR    2025250     91400   18.7000 -113.6700      11.3       186       138        60
OIR    2025250     91400   18.7000 -113.6800      11.4       186       137        60
OIR    2025250     91400   18.7000 -113.6900      11.4       186       135        60
OIR    2025250     91400   18.7000 -113.7000      11.5       186       133        60
OIR    2025250     91400   18.7000 -113.7100      11.5       187       134        60
OIR    2025250     91400   18.7000 -113.7200      11.5       186       134        60
OIR    2025250     91400   18.7000 -113.7300      11.5       186       136        60
OIR    2025250     91400   18.7000 -113.7400      11.5       186       138        60
OIR    2025250     91400   18.7000 -114.0800       9.1       181       139        60
OIR    2025250     91400   18.7000 -114.0900       9.2       181       134        60
OIR    2025250     91400   18.7000 -114.1000       9.1       179       135        60
OIR    2025250     91400   18.7000 -114.1100       9.2       181       137        60
OIR    2025250     91400   18.7000 -114.1200       8.9       186       138        60
OIR    2025250     91400   18.7000 -114.1300       8.7       189       140        60
OIR    2025250     91400   18.6900 -108.9700      38.1       105       139        60
OIR    2025250     91400   18.6900 -110.4400      14.3        56       138        60
OIR    2025250     91400   18.6900 -110.4500      14.3        56       134        60
OIR    2025250     91400   18.6900 -110.4600      14.3        56       131        60
OIR    2025250     91400   18.6900 -110.4700      14.3        56       128        60
OIR    2025250     91400   18.6900 -110.4800      14.3        56       127        60
OIR    2025250     91400   18.6900 -110.4900      14.4        56       126        60
OIR    2025250     91400   18.6900 -110.5000      14.4        56       125        60
OIR    2025250     91400   18.6900 -110.5100      14.4        56       124        60
OIR    2025250     91400   18.6900 -110.5200      14.4        56       123        60
OIR    2025250     91400   18.6900 -110.5300      14.5        56       122        60
OIR    2025250     91400   18.6900 -110.5400      14.7        56       122        60
OIR    2025250     91400   18.6900 -110.5500      15.4        56       122        60
OIR    2025250     91400   18.6900 -110.5600      16.2        55       122        60
OIR    2025250     91400   18.6900 -110.5700      16.8        54       123        60
OIR    2025250     91400   18.6900 -110.5800      17.6        54       125        60
OIR    2025250     91400   18.6900 -110.5900      17.8        54       126        60
OIR    2025250     91400   18.6900 -110.6000      17.9        54       129        60
OIR    2025250     91400   18.6900 -110.6100      18.0        54       132        60
OIR    2025250     91400   18.6900 -110.6200      18.0        54       136        60
OIR    2025250     91400   18.6900 -110.6300      18.1        54       140        60
OIR    2025250     91400   18.6900 -111.3900      17.9        82       140        60
OIR    2025250     91400   18.6900 -111.4000      17.8        82       138        60
OIR    2025250     91400   18.6900 -111.4100      17.5        81       142        60
OIR    2025250     91400   18.6900 -111.4400      17.2        81       142        60
OIR    2025250     91400   18.6900 -111.4500      17.1        81       141        60
OIR    2025250     91400   18.6900 -111.4600      17.0        81       142        60
OIR    2025250     91400   18.6900 -111.4700      16.5        80       142        60
OIR    2025250     91400   18.6900 -111.4800      15.9        80       142        60
OIR    2025250     91400   18.6900 -111.4900      15.6        80       143        60
OIR    2025250     91400   18.6900 -111.8400      11.8        67       143        60
OIR    2025250     91400   18.6900 -113.2400       7.6       147       143        60
OIR    2025250     91400   18.6900 -113.3000       7.4       148       143        60
OIR    2025250     91400   18.6900 -113.3100       7.4       149       142        60
OIR    2025250     91400   18.6900 -113.3200       7.4       149       138        60
OIR    2025250     91400   18.6900 -113.3300       7.4       149       133        60
OIR    2025250     91400   18.6900 -113.3400       7.5       150       133        60
OIR    2025250     91400   18.6900 -113.3500       7.6       151       134        60
OIR    2025250     91400   18.6900 -113.3600       7.8       153       137        60
OIR    2025250     91400   18.6900 -113.3700       8.5       157       143        60
OIR    2025250     91400   18.6900 -113.4300       9.2       166       142        60
OIR    2025250     91400   18.6900 -113.4400       9.2       166       139        60
OIR    2025250     91400   18.6900 -113.4500       9.2       167       139        60
OIR    2025250     91400   18.6900 -113.4600       9.3       167       142        60
OIR    2025250     91400   18.6900 -113.5000       9.4       169       141        60
OIR    2025250     91400   18.6900 -113.5100       9.4       170       137        60
OIR    2025250     91400   18.6900 -113.5200       9.5       171       134        60
OIR    2025250     91400   18.6900 -113.5300       9.5       173       133        60
OIR    2025250     91400   18.6900 -113.5400       9.6       174       132        60
OIR    2025250     91400   18.6900 -113.5500       9.6       175       131        60
OIR    2025250     91400   18.6900 -113.5600       9.7       175       131        60
OIR    2025250     91400   18.6900 -113.5700       9.8       176       128        60
OIR    2025250     91400   18.6900 -113.5800       9.9       178       126        60
OIR    2025250     91400   18.6900 -113.5900      10.3       181       126        60
OIR    2025250     91400   18.6900 -113.6000      10.7       184       126        60
OIR    2025250     91400   18.6900 -113.6100      10.8       184       127        60
OIR    2025250     91400   18.6900 -113.6200      10.8       184       129        60
OIR    2025250     91400   18.6900 -113.6300      10.9       185       130        60
OIR    2025250     91400   18.6900 -113.6400      11.0       185       132        60
OIR    2025250     91400   18.6900 -113.6500      11.0       185       133        60
OIR    2025250     91400   18.6900 -113.6600      11.2       186       136        60
OIR    2025250     91400   18.6900 -113.6700      11.3       186       140        60
OIR    2025250     91400   18.6900 -113.6800      11.4       187       140        60
OIR    2025250     91400   18.6900 -113.6900      11.4       187       137        60
OIR    2025250     91400   18.6900 -113.7000      11.4       187       135        60
OIR    2025250     91400   18.6900 -113.7100      11.5       187       136        60
OIR    2025250     91400   18.6900 -113.7200      11.4       187       137        60
OIR    2025250     91400   18.6900 -113.7300      11.4       187       138        60
OIR    2025250     91400   18.6900 -113.7400      11.3       186       139        60
OIR    2025250     91400   18.6900 -113.7500      11.0       186       143        60
OIR    2025250     91400   18.6800 -110.4400      14.3        56       142        60
OIR    2025250     91400   18.6800 -110.4500      14.3        56       137        60
OIR    2025250     91400   18.6800 -110.4600      14.3        56       134        60
OIR    2025250     91400   18.6800 -110.4700      14.3        56       130        60
OIR    2025250     91400   18.6800 -110.4800      14.3        56       128        60
OIR    2025250     91400   18.6800 -110.4900      14.4        56       128        60
OIR    2025250     91400   18.6800 -110.5000      14.4        56       127        60
OIR    2025250     91400   18.6800 -110.5100      14.4        56       125        60
OIR    2025250     91400   18.6800 -110.5200      14.4        56       124        60
OIR    2025250     91400   18.6800 -110.5300      14.4        56       123        60
OIR    2025250     91400   18.6800 -110.5400      14.5        56       122        60
OIR    2025250     91400   18.6800 -110.5500      15.1        56       122        60
OIR    2025250     91400   18.6800 -110.5600      16.1        55       122        60
OIR    2025250     91400   18.6800 -110.5700      16.9        54       123        60
OIR    2025250     91400   18.6800 -110.5800      17.6        54       125        60
OIR    2025250     91400   18.6800 -110.5900      17.8        54       127        60
OIR    2025250     91400   18.6800 -110.6000      17.9        54       129        60
OIR    2025250     91400   18.6800 -110.6100      18.0        54       132        60
OIR    2025250     91400   18.6800 -110.6200      18.0        54       136        60
OIR    2025250     91400   18.6800 -110.6300      18.0        54       139        60
OIR    2025250     91400   18.6800 -111.3900      17.9        82       141        60
OIR    2025250     91400   18.6800 -111.4000      17.8        82       136        60
OIR    2025250     91400   18.6800 -111.4100      17.5        81       142        60
OIR    2025250     91400   18.6800 -111.7500      10.1        62       142        60
OIR    2025250     91400   18.6800 -111.7600      10.2        63       142        60
OIR    2025250     91400   18.6800 -113.2400       7.6       147       143        60
OIR    2025250     91400   18.6800 -113.3000       7.4       148       143        60
OIR    2025250     91400   18.6800 -113.3100       7.4       149       141        60
OIR    2025250     91400   18.6800 -113.3200       7.4       149       138        60
OIR    2025250     91400   18.6800 -113.3300       7.4       149       135        60
OIR    2025250     91400   18.6800 -113.3400       7.4       150       134        60
OIR    2025250     91400   18.6800 -113.3500       7.5       151       135        60
OIR    2025250     91400   18.6800 -113.3600       7.7       153       136        60
OIR    2025250     91400   18.6800 -113.3700       8.4       157       140        60
OIR    2025250     91400   18.6800 -113.4200       9.2       165       142        60
OIR    2025250     91400   18.6800 -113.4300       9.2       166       139        60
OIR    2025250     91400   18.6800 -113.4400       9.2       167       139        60
OIR    2025250     91400   18.6800 -113.4500       9.2       167       140        60
OIR    2025250     91400   18.6800 -113.4600       9.2       168       142        60
OIR    2025250     91400   18.6800 -113.4800       9.3       169       143        60
OIR    2025250     91400   18.6800 -113.4900       9.3       169       142        60
OIR    2025250     91400   18.6800 -113.5000       9.4       170       140        60
OIR    2025250     91400   18.6800 -113.5100       9.4       170       137        60
OIR    2025250     91400   18.6800 -113.5200       9.5       172       135        60
OIR    2025250     91400   18.6800 -113.5300       9.5       174       133        60
OIR    2025250     91400   18.6800 -113.5400       9.5       175       130        60
OIR    2025250     91400   18.6800 -113.5500       9.5       175       130        60
OIR    2025250     91400   18.6800 -113.5600       9.6       176       131        60
OIR    2025250     91400   18.6800 -113.5700       9.6       177       130        60
OIR    2025250     91400   18.6800 -113.5800       9.8       178       128        60
OIR    2025250     91400   18.6800 -113.5900      10.1       181       127        60
OIR    2025250     91400   18.6800 -113.6000      10.5       183       126        60
OIR    2025250     91400   18.6800 -113.6100      10.7       184       126        60
OIR    2025250     91400   18.6800 -113.6200      10.8       184       128        60
OIR    2025250     91400   18.6800 -113.6300      10.9       185       130        60
OIR    2025250     91400   18.6800 -113.6400      10.9       185       132        60
OIR    2025250     91400   18.6800 -113.6500      11.0       186       135        60
OIR    2025250     91400   18.6800 -113.6600      11.2       186       137        60
OIR    2025250     91400   18.6800 -113.6700      11.3       187       139        60
OIR    2025250     91400   18.6800 -113.6800      11.3       187       141        60
OIR    2025250     91400   18.6800 -113.6900      11.4       187       142        60
OIR    2025250     91400   18.6800 -113.7000      11.4       188       143        60
OIR    2025250     91400   18.6800 -113.7100      11.4       187       142        60
OIR    2025250     91400   18.6800 -113.7200      11.4       187       141        60
OIR    2025250     91400   18.6800 -113.7300      11.2       187       142        60
OIR    2025250     91400   18.6800 -113.7400      11.0       187       142        60
OIR    2025250     91400   18.6800 -114.3600      12.6       197       142        60
OIR    2025250     91400   18.6800 -114.3700      12.6       197       142        60
OIR    2025250     91400   18.6800 -114.3800      12.6       197       143        60
OIR    2025250     91400   18.6700 -110.4500      14.4        56       141        60
OIR    2025250     91400   18.6700 -110.4600      14.3        56       137        60
OIR    2025250     91400   18.6700 -110.4700      14.3        56       133        60
OIR    2025250     91400   18.6700 -110.4800      14.3        56       130        60
OIR    2025250     91400   18.6700 -110.4900      14.4        56       129        60
OIR    2025250     91400   18.6700 -110.5000      14.4        56       128        60
OIR    2025250     91400   18.6700 -110.5100      14.4        56       126        60
OIR    2025250     91400   18.6700 -110.5200      14.4        56       125        60
OIR    2025250     91400   18.6700 -110.5300      14.4        56       124        60
OIR    2025250     91400   18.6700 -110.5400      14.5        56       123        60
OIR    2025250     91400   18.6700 -110.5500      15.0        56       122        60
OIR    2025250     91400   18.6700 -110.5600      16.0        55       123        60
OIR    2025250     91400   18.6700 -110.5700      16.9        54       124        60
OIR    2025250     91400   18.6700 -110.5800      17.7        54       125        60
OIR    2025250     91400   18.6700 -110.5900      17.8        54       127        60
OIR    2025250     91400   18.6700 -110.6000      17.9        54       129        60
OIR    2025250     91400   18.6700 -110.6100      17.9        54       132        60
OIR    2025250     91400   18.6700 -110.6200      18.0        54       135        60
OIR    2025250     91400   18.6700 -110.6300      18.0        54       139        60
OIR    2025250     91400   18.6700 -111.4000      17.8        81       141        60
OIR    2025250     91400   18.6700 -111.4100      17.6        81       142        60
OIR    2025250     91400   18.6700 -111.7500       8.8        64       141        60
OIR    2025250     91400   18.6700 -111.7600       9.3        65       138        60
OIR    2025250     91400   18.6700 -111.7700       9.5        66       138        60
OIR    2025250     91400   18.6700 -111.7800      10.1        67       139        60
OIR    2025250     91400   18.6700 -111.7900      11.3        66       142        60
OIR    2025250     91400   18.6700 -113.3000       7.4       148       142        60
OIR    2025250     91400   18.6700 -113.3100       7.4       148       137        60
OIR    2025250     91400   18.6700 -113.3200       7.4       149       137        60
OIR    2025250     91400   18.6700 -113.3300       7.4       149       137        60
OIR    2025250     91400   18.6700 -113.3400       7.4       150       137        60
OIR    2025250     91400   18.6700 -113.3500       7.5       151       137        60
OIR    2025250     91400   18.6700 -113.3600       7.7       152       137        60
OIR    2025250     91400   18.6700 -113.3700       8.2       156       137        60
OIR    2025250     91400   18.6700 -113.3800       8.7       160       137        60
OIR    2025250     91400   18.6700 -113.3900       9.0       162       136        60
OIR    2025250     91400   18.6700 -113.4000       9.1       163       136        60
OIR    2025250     91400   18.6700 -113.4100       9.2       164       137        60
OIR    2025250     91400   18.6700 -113.4200       9.2       165       139        60
OIR    2025250     91400   18.6700 -113.4300       9.2       166       140        60
OIR    2025250     91400   18.6700 -113.4400       9.2       167       140        60
OIR    2025250     91400   18.6700 -113.4500       9.2       167       141        60
OIR    2025250     91400   18.6700 -113.4600       9.2       168       142        60
OIR    2025250     91400   18.6700 -113.4700       9.2       169       143        60
OIR    2025250     91400   18.6700 -113.4800       9.3       169       142        60
OIR    2025250     91400   18.6700 -113.4900       9.3       170       140        60
OIR    2025250     91400   18.6700 -113.5000       9.4       171       138        60
OIR    2025250     91400   18.6700 -113.5100       9.4       172       135        60
OIR    2025250     91400   18.6700 -113.5200       9.4       173       132        60
OIR    2025250     91400   18.6700 -113.5300       9.4       175       131        60
OIR    2025250     91400   18.6700 -113.5400       9.4       175       129        60
OIR    2025250     91400   18.6700 -113.5500       9.4       176       129        60
OIR    2025250     91400   18.6700 -113.5600       9.5       177       129        60
OIR    2025250     91400   18.6700 -113.5700       9.5       177       128        60
OIR    2025250     91400   18.6700 -113.5800       9.6       178       128        60
OIR    2025250     91400   18.6700 -113.5900       9.9       181       127        60
OIR    2025250     91400   18.6700 -113.6000      10.2       183       127        60
OIR    2025250     91400   18.6700 -113.6100      10.5       184       126        60
OIR    2025250     91400   18.6700 -113.6200      10.7       184       128        60
OIR    2025250     91400   18.6700 -113.6300      10.8       185       130        60
OIR    2025250     91400   18.6700 -113.6400      10.9       185       132        60
OIR    2025250     91400   18.6700 -113.6500      11.0       186       135        60
OIR    2025250     91400   18.6700 -113.6600      11.2       187       138        60
OIR    2025250     91400   18.6700 -113.6700      11.3       187       140        60
OIR    2025250     91400   18.6700 -113.6800      11.3       188       142        60
OIR    2025250     91400   18.6700 -114.3700      12.5       197       142        60
OIR    2025250     91400   18.6700 -114.3800      12.6       197       140        60
OIR    2025250     91400   18.6700 -114.3900      12.6       197       141        60
OIR    2025250     91400   18.6600 -110.4700      14.3        56       138        60
OIR    2025250     91400   18.6600 -110.4800      14.3        56       134        60
OIR    2025250     91400   18.6600 -110.4900      14.4        56       131        60
OIR    2025250     91400   18.6600 -110.5000      14.4        56       129        60
OIR    2025250     91400   18.6600 -110.5100      14.4        56       127        60
OIR    2025250     91400   18.6600 -110.5200      14.4        56       125        60
OIR    2025250     91400   18.6600 -110.5300      14.4        56       124        60
OIR    2025250     91400   18.6600 -110.5400      14.5        56       123        60
OIR    2025250     91400   18.6600 -110.5500      14.9        56       123        60
OIR    2025250     91400   18.6600 -110.5600      16.0        55       123        60
OIR    2025250     91400   18.6600 -110.5700      17.1        54       124        60
OIR    2025250     91400   18.6600 -110.5800      17.7        54       125        60
OIR    2025250     91400   18.6600 -110.5900      17.8        54       127        60
OIR    2025250     91400   18.6600 -110.6000      17.9        54       128        60
OIR    2025250     91400   18.6600 -110.6100      17.9        54       131        60
OIR    2025250     91400   18.6600 -110.6200      17.9        54       133        60
OIR    2025250     91400   18.6600 -110.6300      18.0        54       138        60
OIR    2025250     91400   18.6600 -111.7600       8.6        65       139        60
OIR    2025250     91400   18.6600 -111.7700       8.8        66       137        60
OIR    2025250     91400   18.6600 -111.7800       9.4        67       135        60
OIR    2025250     91400   18.6600 -111.7900      11.0        67       139        60
OIR    2025250     91400   18.6600 -113.3000       7.4       148       142        60
OIR    2025250     91400   18.6600 -113.3100       7.4       148       138        60
OIR    2025250     91400   18.6600 -113.3200       7.4       149       138        60
OIR    2025250     91400   18.6600 -113.3300       7.4       149       138        60
OIR    2025250     91400   18.6600 -113.3400       7.4       150       139        60
OIR    2025250     91400   18.6600 -113.3500       7.4       150       138        60
OIR    2025250     91400   18.6600 -113.3600       7.6       152       137        60
OIR    2025250     91400   18.6600 -113.3700       8.0       155       136        60
OIR    2025250     91400   18.6600 -113.3800       8.5       158       135        60
OIR    2025250     91400   18.6600 -113.3900       8.9       161       133        60
OIR    2025250     91400   18.6600 -113.4000       9.0       163       132        60
OIR    2025250     91400   18.6600 -113.4100       9.1       164       132        60
OIR    2025250     91400   18.6600 -113.4200       9.1       165       136        60
OIR    2025250     91400   18.6600 -113.4300       9.1       166       140        60
OIR    2025250     91400   18.6600 -113.4400       9.2       167       141        60
OIR    2025250     91400   18.6600 -113.4500       9.2       167       142        60
OIR    2025250     91400   18.6600 -113.4600       9.2       169       143        60
OIR    2025250     91400   18.6600 -113.4700       9.2       169       143        60
OIR    2025250     91400   18.6600 -113.4800       9.2       170       142        60
OIR    2025250     91400   18.6600 -113.4900       9.3       171       139        60
OIR    2025250     91400   18.6600 -113.5000       9.3       172       136        60
OIR    2025250     91400   18.6600 -113.5100       9.3       174       133        60
OIR    2025250     91400   18.6600 -113.5200       9.2       174       130        60
OIR    2025250     91400   18.6600 -113.5300       9.3       175       129        60
OIR    2025250     91400   18.6600 -113.5400       9.3       176       128        60
OIR    2025250     91400   18.6600 -113.5500       9.3       177       127        60
OIR    2025250     91400   18.6600 -113.5600       9.4       177       126        60
OIR    2025250     91400   18.6600 -113.5700       9.5       178       126        60
OIR    2025250     91400   18.6600 -113.5800       9.5       179       126        60
OIR    2025250     91400   18.6600 -113.5900       9.7       181       126        60
OIR    2025250     91400   18.6600 -113.6000       9.9       183       126        60
OIR    2025250     91400   18.6600 -113.6100      10.1       184       126        60
OIR    2025250     91400   18.6600 -113.6200      10.3       186       128        60
OIR    2025250     91400   18.6600 -113.6300      10.4       187       131        60
OIR    2025250     91400   18.6600 -113.6400      10.6       187       133        60
OIR    2025250     91400   18.6600 -113.6500      10.8       187       135        60
OIR    2025250     91400   18.6600 -113.6600      11.0       187       137        60
OIR    2025250     91400   18.6600 -113.6700      11.2       188       141        60
OIR    2025250     91400   18.6600 -114.3800      12.5       197       141        60
OIR    2025250     91400   18.6600 -114.3900      12.5       197       139        60
OIR    2025250     91400   18.6600 -114.4000      12.5       197       140        60
OIR    2025250     91400   18.6600 -114.4100      12.5       197       142        60
OIR    2025250     91400   18.6500 -109.0000      29.8        89       139        60
OIR    2025250     91400   18.6500 -110.4700      14.3        56       142        60
OIR    2025250     91400   18.6500 -110.4800      14.3        56       138        60
OIR    2025250     91400   18.6500 -110.4900      14.3        56       134        60
OIR    2025250     91400   18.6500 -110.5000      14.4        56       130        60
OIR    2025250     91400   18.6500 -110.5100      14.4        56       127        60
OIR    2025250     91400   18.6500 -110.5200      14.4        56       126        60
OIR    2025250     91400   18.6500 -110.5300      14.5        56       125        60
OIR    2025250     91400   18.6500 -110.5400      14.5        56       124        60
OIR    2025250     91400   18.6500 -110.5500      14.8        56       123        60
OIR    2025250     91400   18.6500 -110.5600      15.9        55       123        60
OIR    2025250     91400   18.6500 -110.5700      17.2        55       124        60
OIR    2025250     91400   18.6500 -110.5800      17.8        54       125        60
OIR    2025250     91400   18.6500 -110.5900      17.8        54       126        60
OIR    2025250     91400   18.6500 -110.6000      17.9        54       128        60
OIR    2025250     91400   18.6500 -110.6100      17.9        54       129        60
OIR    2025250     91400   18.6500 -110.6200      17.9        54       131        60
OIR    2025250     91400   18.6500 -110.6300      17.9        54       135        60
OIR    2025250     91400   18.6500 -111.7600       8.4        65       142        60
OIR    2025250     91400   18.6500 -111.7700       8.5        66       138        60
OIR    2025250     91400   18.6500 -111.7800       8.9        66       134        60
OIR    2025250     91400   18.6500 -111.7900      10.9        66       135        60
OIR    2025250     91400   18.6500 -111.8000      11.5        66       142        60
OIR    2025250     91400   18.6500 -113.2700       7.4       147       143        60
OIR    2025250     91400   18.6500 -113.2800       7.4       147       142        60
OIR    2025250     91400   18.6500 -113.2900       7.4       148       142        60
OIR    2025250     91400   18.6500 -113.3000       7.4       148       142        60
OIR    2025250     91400   18.6500 -113.3100       7.4       148       141        60
OIR    2025250     91400   18.6500 -113.3200       7.3       149       140        60
OIR    2025250     91400   18.6500 -113.3300       7.3       149       139        60
OIR    2025250     91400   18.6500 -113.3400       7.3       150       138        60
OIR    2025250     91400   18.6500 -113.3500       7.3       150       137        60
OIR    2025250     91400   18.6500 -113.3600       7.4       151       136        60
OIR    2025250     91400   18.6500 -113.3700       7.7       153       137        60
OIR    2025250     91400   18.6500 -113.3800       8.2       157       139        60
OIR    2025250     91400   18.6500 -113.3900       8.6       160       139        60
OIR    2025250     91400   18.6500 -113.4000       8.8       162       137        60
OIR    2025250     91400   18.6500 -113.4100       9.0       164       135        60
OIR    2025250     91400   18.6500 -113.4200       9.1       166       137        60
OIR    2025250     91400   18.6500 -113.4300       9.1       167       139        60
OIR    2025250     91400   18.6500 -113.4400       9.1       167       140        60
OIR    2025250     91400   18.6500 -113.4500       9.2       168       141        60
OIR    2025250     91400   18.6500 -113.4600       9.2       169       142        60
OIR    2025250     91400   18.6500 -113.4700       9.2       170       142        60
OIR    2025250     91400   18.6500 -113.4800       9.2       171       141        60
OIR    2025250     91400   18.6500 -113.4900       9.1       173       138        60
OIR    2025250     91400   18.6500 -113.5000       9.2       174       135        60
OIR    2025250     91400   18.6500 -113.5100       9.2       174       134        60
OIR    2025250     91400   18.6500 -113.5200       9.2       175       133        60
OIR    2025250     91400   18.6500 -113.5300       9.2       175       131        60
OIR    2025250     91400   18.6500 -113.5400       9.2       176       130        60
OIR    2025250     91400   18.6500 -113.5500       9.2       176       128        60
OIR    2025250     91400   18.6500 -113.5600       9.3       177       126        60
OIR    2025250     91400   18.6500 -113.5700       9.4       178       124        60
OIR    2025250     91400   18.6500 -113.5800       9.4       180       125        60
OIR    2025250     91400   18.6500 -113.5900       9.5       181       126        60
OIR    2025250     91400   18.6500 -113.6000       9.7       183       126        60
OIR    2025250     91400   18.6500 -113.6100       9.8       185       127        60
OIR    2025250     91400   18.6500 -113.6200      10.0       187       129        60
OIR    2025250     91400   18.6500 -113.6300      10.2       188       131        60
OIR    2025250     91400   18.6500 -113.6400      10.3       189       133        60
OIR    2025250     91400   18.6500 -113.6500      10.6       188       137        60
OIR    2025250     91400   18.6500 -113.6600      10.9       189       140        60
OIR    2025250     91400   18.6500 -113.6700      11.1       189       142        60
OIR    2025250     91400   18.6500 -114.3900      12.5       197       139        60
OIR    2025250     91400   18.6500 -114.4000      12.5       197       138        60
OIR    2025250     91400   18.6500 -114.4100      12.5       197       138        60
OIR    2025250     91400   18.6500 -114.4200      12.5       197       140        60
OIR    2025250     91400   18.6500 -114.4300      12.5       197       143        60
OIR    2025250     91400   18.6500 -114.4400      12.5       197       143        60
OIR    2025250     91400   18.6500 -114.4500      12.5       197       142        60
OIR    2025250     91400   18.6400 -109.0000      24.5        88       126        60
OIR    2025250     91400   18.6400 -109.0100      22.9        85       119        60
OIR    2025250     91400   18.6400 -109.0200      18.4        79       141        60
OIR    2025250     91400   18.6400 -110.4800      14.3        56       141        60
OIR    2025250     91400   18.6400 -110.4900      14.3        56       138        60
OIR    2025250     91400   18.6400 -110.5000      14.3        56       133        60
OIR    2025250     91400   18.6400 -110.5100      14.4        56       129        60
OIR    2025250     91400   18.6400 -110.5200      14.4        56       127        60
OIR    2025250     91400   18.6400 -110.5300      14.5        56       124        60
OIR    2025250     91400   18.6400 -110.5400      14.6        56       124        60
OIR    2025250     91400   18.6400 -110.5500      14.8        56       124        60
OIR    2025250     91400   18.6400 -110.5600      15.8        55       124        60
OIR    2025250     91400   18.6400 -110.5700      17.3        55       125        60
OIR    2025250     91400   18.6400 -110.5800      17.8        54       126        60
OIR    2025250     91400   18.6400 -110.5900      17.8        54       127        60
OIR    2025250     91400   18.6400 -110.6000      17.8        54       128        60
OIR    2025250     91400   18.6400 -110.6100      17.9        54       128        60
OIR    2025250     91400   18.6400 -110.6200      17.9        54       129        60
OIR    2025250     91400   18.6400 -110.6300      17.9        54       131        60
OIR    2025250     91400   18.6400 -110.6400      17.9        54       137        60
OIR    2025250     91400   18.6400 -110.6500      17.9        55       142        60
OIR    2025250     91400   18.6400 -110.6600      17.9        55       142        60
OIR    2025250     91400   18.6400 -110.6700      18.0        55       142        60
OIR    2025250     91400   18.6400 -111.4100      17.5        81       143        60
OIR    2025250     91400   18.6400 -111.7800       8.6        66       140        60
OIR    2025250     91400   18.6400 -111.7900      10.5        66       137        60
OIR    2025250     91400   18.6400 -111.8000      11.4        67       137        60
OIR    2025250     91400   18.6400 -111.8100      11.6        67       138        60
OIR    2025250     91400   18.6400 -111.8200      11.6        67       141        60
OIR    2025250     91400   18.6400 -113.2700       7.4       147       143        60
OIR    2025250     91400   18.6400 -113.2800       7.4       147       140        60
OIR    2025250     91400   18.6400 -113.2900       7.4       147       140        60
OIR    2025250     91400   18.6400 -113.3000       7.3       148       140        60
OIR    2025250     91400   18.6400 -113.3100       7.3       148       141        60
OIR    2025250     91400   18.6400 -113.3200       7.3       149       142        60
OIR    2025250     91400   18.6400 -113.3300       7.3       149       140        60
OIR    2025250     91400   18.6400 -113.3400       7.3       149       138        60
OIR    2025250     91400   18.6400 -113.3500       7.3       150       137        60
OIR    2025250     91400   18.6400 -113.3600       7.3       150       136        60
OIR    2025250     91400   18.6400 -113.3700       7.4       152       136        60
OIR    2025250     91400   18.6400 -113.3800       7.7       154       139        60
OIR    2025250     91400   18.6400 -113.3900       8.2       158       141        60
OIR    2025250     91400   18.6400 -113.4000       8.5       161       140        60
OIR    2025250     91400   18.6400 -113.4100       8.8       164       139        60
OIR    2025250     91400   18.6400 -113.4200       9.0       166       139        60
OIR    2025250     91400   18.6400 -113.4300       9.0       167       138        60
OIR    2025250     91400   18.6400 -113.4400       9.1       168       139        60
OIR    2025250     91400   18.6400 -113.4500       9.1       169       140        60
OIR    2025250     91400   18.6400 -113.4600       9.1       170       140        60
OIR    2025250     91400   18.6400 -113.4700       9.1       171       140        60
OIR    2025250     91400   18.6400 -113.4800       9.1       173       140        60
OIR    2025250     91400   18.6400 -113.4900       9.1       174       137        60
OIR    2025250     91400   18.6400 -113.5000       9.1       174       134        60
OIR    2025250     91400   18.6400 -113.5100       9.1       175       134        60
OIR    2025250     91400   18.6400 -113.5200       9.1       175       135        60
OIR    2025250     91400   18.6400 -113.5300       9.1       176       135        60
OIR    2025250     91400   18.6400 -113.5400       9.1       176       132        60
OIR    2025250     91400   18.6400 -113.5500       9.1       176       130        60
OIR    2025250     91400   18.6400 -113.5600       9.1       177       126        60
OIR    2025250     91400   18.6400 -113.5700       9.2       178       122        60
OIR    2025250     91400   18.6400 -113.5800       9.3       180       123        60
OIR    2025250     91400   18.6400 -113.5900       9.3       182       125        60
OIR    2025250     91400   18.6400 -113.6000       9.4       184       126        60
OIR    2025250     91400   18.6400 -113.6100       9.5       186       128        60
OIR    2025250     91400   18.6400 -113.6200       9.7       189       129        60
OIR    2025250     91400   18.6400 -113.6300       9.9       190       130        60
OIR    2025250     91400   18.6400 -113.6400      10.0       190       132        60
OIR    2025250     91400   18.6400 -113.6500      10.2       191       138        60
OIR    2025250     91400   18.6400 -113.7000      11.5       190       143        60
OIR    2025250     91400   18.6400 -113.7100      11.5       190       142        60
OIR    2025250     91400   18.6400 -113.7200      11.6       190       142        60
OIR    2025250     91400   18.6400 -113.7300      11.6       191       142        60
OIR    2025250     91400   18.6400 -113.7400      11.7       193       142        60
OIR    2025250     91400   18.6400 -114.2500      11.5       187       143        60
OIR    2025250     91400   18.6400 -114.2600      11.6       187       141        60
OIR    2025250     91400   18.6400 -114.3400      12.5       197       142        60
OIR    2025250     91400   18.6400 -114.3900      12.5       197       142        60
OIR    2025250     91400   18.6400 -114.4000      12.5       197       140        60
OIR    2025250     91400   18.6400 -114.4100      12.5       197       139        60
OIR    2025250     91400   18.6400 -114.4200      12.5       197       139        60
OIR    2025250     91400   18.6400 -114.4300      12.5       197       141        60
OIR    2025250     91400   18.6400 -114.4400      12.5       197       142        60
OIR    2025250     91400   18.6300 -109.0100      18.8        80       145        60
OIR    2025250     91400   18.6300 -110.4900      14.3        56       141        60
OIR    2025250     91400   18.6300 -110.5000      14.3        56       136        60
OIR    2025250     91400   18.6300 -110.5100      14.3        56       132        60
OIR    2025250     91400   18.6300 -110.5200      14.4        56       128        60
OIR    2025250     91400   18.6300 -110.5300      14.5        56       125        60
OIR    2025250     91400   18.6300 -110.5400      14.7        56       124        60
OIR    2025250     91400   18.6300 -110.5500      15.0        56       124        60
OIR    2025250     91400   18.6300 -110.5600      15.7        55       125        60
OIR    2025250     91400   18.6300 -110.5700      17.3        55       126        60
OIR    2025250     91400   18.6300 -110.5800      17.8        54       127        60
OIR    2025250     91400   18.6300 -110.5900      17.8        54       127        60
OIR    2025250     91400   18.6300 -110.6000      17.8        54       128        60
OIR    2025250     91400   18.6300 -110.6100      17.9        54       128        60
OIR    2025250     91400   18.6300 -110.6200      17.9        54       128        60
OIR    2025250     91400   18.6300 -110.6300      17.9        54       128        60
OIR    2025250     91400   18.6300 -110.6400      17.9        55       131        60
OIR    2025250     91400   18.6300 -110.6500      17.9        55       133        60
OIR    2025250     91400   18.6300 -110.6600      17.9        55       136        60
OIR    2025250     91400   18.6300 -110.6700      18.0        55       139        60
OIR    2025250     91400   18.6300 -111.3800      17.8        82       142        60
OIR    2025250     91400   18.6300 -111.3900      17.7        82       140        60
OIR    2025250     91400   18.6300 -111.4000      17.6        81       141        60
OIR    2025250     91400   18.6300 -111.4100      17.5        81       141        60
OIR    2025250     91400   18.6300 -111.7900       9.7        66       142        60
OIR    2025250     91400   18.6300 -111.8000      11.2        67       136        60
OIR    2025250     91400   18.6300 -111.8100      11.5        67       130        60
OIR    2025250     91400   18.6300 -111.8200      11.6        67       135        60
OIR    2025250     91400   18.6300 -111.8300      11.6        67       142        60
OIR    2025250     91400   18.6300 -113.2700       7.4       147       142        60
OIR    2025250     91400   18.6300 -113.2800       7.4       147       140        60
OIR    2025250     91400   18.6300 -113.2900       7.4       148       139        60
OIR    2025250     91400   18.6300 -113.3000       7.3       148       138        60
OIR    2025250     91400   18.6300 -113.3100       7.3       148       140        60
OIR    2025250     91400   18.6300 -113.3200       7.2       149       141        60
OIR    2025250     91400   18.6300 -113.3300       7.2       149       141        60
OIR    2025250     91400   18.6300 -113.3400       7.2       149       140        60
OIR    2025250     91400   18.6300 -113.3500       7.2       150       138        60
OIR    2025250     91400   18.6300 -113.3600       7.2       150       135        60
OIR    2025250     91400   18.6300 -113.3700       7.3       151       134        60
OIR    2025250     91400   18.6300 -113.3800       7.4       152       136        60
OIR    2025250     91400   18.6300 -113.3900       7.7       155       138        60
OIR    2025250     91400   18.6300 -113.4000       8.1       159       139        60
OIR    2025250     91400   18.6300 -113.4100       8.5       163       139        60
OIR    2025250     91400   18.6300 -113.4200       8.8       166       139        60
OIR    2025250     91400   18.6300 -113.4300       8.9       167       139        60
OIR    2025250     91400   18.6300 -113.4400       9.0       168       139        60
OIR    2025250     91400   18.6300 -113.4500       9.0       169       139        60
OIR    2025250     91400   18.6300 -113.4600       9.1       171       139        60
OIR    2025250     91400   18.6300 -113.4700       9.1       172       138        60
OIR    2025250     91400   18.6300 -113.4800       9.1       173       136        60
OIR    2025250     91400   18.6300 -113.4900       9.1       174       136        60
OIR    2025250     91400   18.6300 -113.5000       9.1       174       135        60
OIR    2025250     91400   18.6300 -113.5100       9.1       175       135        60
OIR    2025250     91400   18.6300 -113.5200       9.0       175       136        60
OIR    2025250     91400   18.6300 -113.5300       9.0       176       136        60
OIR    2025250     91400   18.6300 -113.5400       9.0       176       132        60
OIR    2025250     91400   18.6300 -113.5500       9.0       176       129        60
OIR    2025250     91400   18.6300 -113.5600       9.1       177       127        60
OIR    2025250     91400   18.6300 -113.5700       9.1       179       124        60
OIR    2025250     91400   18.6300 -113.5800       9.1       181       125        60
OIR    2025250     91400   18.6300 -113.5900       9.1       183       126        60
OIR    2025250     91400   18.6300 -113.6000       9.2       184       127        60
OIR    2025250     91400   18.6300 -113.6100       9.3       186       129        60
OIR    2025250     91400   18.6300 -113.6200       9.5       189       130        60
OIR    2025250     91400   18.6300 -113.6300       9.7       190       133        60
OIR    2025250     91400   18.6300 -113.6400       9.8       191       135        60
OIR    2025250     91400   18.6300 -113.6500      10.2       191       140        60
OIR    2025250     91400   18.6300 -113.6900      11.7       194       143        60
OIR    2025250     91400   18.6300 -113.7000      12.0       193       141        60
OIR    2025250     91400   18.6300 -113.7100      11.9       193       140        60
OIR    2025250     91400   18.6300 -113.7200      12.0       193       140        60
OIR    2025250     91400   18.6300 -113.7300      12.2       195       141        60
OIR    2025250     91400   18.6300 -113.7400      12.3       197       142        60
OIR    2025250     91400   18.6300 -114.2600      11.6       187       140        60
OIR    2025250     91400   18.6300 -114.2700      11.6       188       142        60
OIR    2025250     91400   18.6300 -114.3200      12.4       196       143        60
OIR    2025250     91400   18.6300 -114.3300      12.5       197       141        60
OIR    2025250     91400   18.6300 -114.3400      12.5       197       140        60
OIR    2025250     91400   18.6300 -114.3500      12.5       197       141        60
OIR    2025250     91400   18.6300 -114.3600      12.5       197       143        60
OIR    2025250     91400   18.6300 -114.3900      12.5       197       142        60
OIR    2025250     91400   18.6300 -114.4000      12.5       197       141        60
OIR    2025250     91400   18.6300 -114.4100      12.5       197       140        60
OIR    2025250     91400   18.6300 -114.4200      12.5       197       140        60
OIR    2025250     91400   18.6300 -114.4300      12.5       197       140        60
OIR    2025250     91400   18.6300 -114.4400      12.5       197       141        60
OIR    2025250     91400   18.6300 -114.4800      12.4       198       140        60
OIR    2025250     91400   18.6300 -118.3200      14.2        41       142        60
OIR    2025250     91400   18.6300 -118.3300      14.3        41       141        60
OIR    2025250     91400   18.6200 -110.5000      14.3        56       140        60
OIR    2025250     91400   18.6200 -110.5100      14.3        56       136        60
OIR    2025250     91400   18.6200 -110.5200      14.3        56       132        60
OIR    2025250     91400   18.6200 -110.5300      14.5        56       127        60
OIR    2025250     91400   18.6200 -110.5400      14.6        55       125        60
OIR    2025250     91400   18.6200 -110.5500      15.1        56       125        60
OIR    2025250     91400   18.6200 -110.5600      15.8        55       125        60
OIR    2025250     91400   18.6200 -110.5700      17.2        55       126        60
OIR    2025250     91400   18.6200 -110.5800      17.8        54       127        60
OIR    2025250     91400   18.6200 -110.5900      17.8        54       127        60
OIR    2025250     91400   18.6200 -110.6000      17.8        54       128        60
OIR    2025250     91400   18.6200 -110.6100      17.9        54       128        60
OIR    2025250     91400   18.6200 -110.6200      17.9        54       128        60
OIR    2025250     91400   18.6200 -110.6300      17.9        55       128        60
OIR    2025250     91400   18.6200 -110.6400      17.9        55       129        60
OIR    2025250     91400   18.6200 -110.6500      17.9        55       131        60
OIR    2025250     91400   18.6200 -110.6600      17.9        55       133        60
OIR    2025250     91400   18.6200 -110.6700      18.0        55       136        60
OIR    2025250     91400   18.6200 -110.6800      18.1        55       140        60
OIR    2025250     91400   18.6200 -111.3700      17.6        83       142        60
OIR    2025250     91400   18.6200 -111.3800      17.7        82       139        60
OIR    2025250     91400   18.6200 -111.3900      17.6        82       137        60
OIR    2025250     91400   18.6200 -111.4000      17.5        81       138        60
OIR    2025250     91400   18.6200 -111.4100      17.5        81       140        60
OIR    2025250     91400   18.6200 -111.4200      17.4        81       142        60
OIR    2025250     91400   18.6200 -111.8000      10.6        67       140        60
OIR    2025250     91400   18.6200 -111.8100      11.4        67       135        60
OIR    2025250     91400   18.6200 -111.8200      11.6        67       136        60
OIR    2025250     91400   18.6200 -111.8300      11.6        67       140        60
OIR    2025250     91400   18.6200 -113.2600       7.4       147       143        60
OIR    2025250     91400   18.6200 -113.2700       7.4       147       140        60
OIR    2025250     91400   18.6200 -113.2800       7.4       147       137        60
OIR    2025250     91400   18.6200 -113.2900       7.3       148       137        60
OIR    2025250     91400   18.6200 -113.3000       7.3       148       136        60
OIR    2025250     91400   18.6200 -113.3100       7.2       149       138        60
OIR    2025250     91400   18.6200 -113.3200       7.2       149       140        60
OIR    2025250     91400   18.6200 -113.3300       7.2       149       140        60
OIR    2025250     91400   18.6200 -113.3400       7.2       149       139        60
OIR    2025250     91400   18.6200 -113.3500       7.2       150       138        60
OIR    2025250     91400   18.6200 -113.3600       7.2       150       135        60
OIR    2025250     91400   18.6200 -113.3700       7.2       150       133        60
OIR    2025250     91400   18.6200 -113.3800       7.3       151       134        60
OIR    2025250     91400   18.6200 -113.3900       7.5       153       135        60
OIR    2025250     91400   18.6200 -113.4000       7.8       156       136        60
OIR    2025250     91400   18.6200 -113.4100       8.2       161       138        60
OIR    2025250     91400   18.6200 -113.4200       8.6       166       139        60
OIR    2025250     91400   18.6200 -113.4300       8.8       168       139        60
OIR    2025250     91400   18.6200 -113.4400       8.9       169       138        60
OIR    2025250     91400   18.6200 -113.4500       9.0       170       138        60
OIR    2025250     91400   18.6200 -113.4600       9.0       171       138        60
OIR    2025250     91400   18.6200 -113.4700       9.0       173       136        60
OIR    2025250     91400   18.6200 -113.4800       9.0       173       133        60
OIR    2025250     91400   18.6200 -113.4900       9.0       174       134        60
OIR    2025250     91400   18.6200 -113.5000       9.0       174       136        60
OIR    2025250     91400   18.6200 -113.5100       9.0       175       137        60
OIR    2025250     91400   18.6200 -113.5200       9.0       175       137        60
OIR    2025250     91400   18.6200 -113.5300       9.0       176       136        60
OIR    2025250     91400   18.6200 -113.5400       9.0       176       133        60
OIR    2025250     91400   18.6200 -113.5500       9.0       177       129        60
OIR    2025250     91400   18.6200 -113.5600       8.9       178       128        60
OIR    2025250     91400   18.6200 -113.5700       8.9       180       127        60
OIR    2025250     91400   18.6200 -113.5800       8.9       182       127        60
OIR    2025250     91400   18.6200 -113.5900       8.9       183       128        60
OIR    2025250     91400   18.6200 -113.6000       9.0       185       129        60
OIR    2025250     91400   18.6200 -113.6100       9.1       185       130        60
OIR    2025250     91400   18.6200 -113.6200       9.2       186       132        60
OIR    2025250     91400   18.6200 -113.6300       9.4       189       135        60
OIR    2025250     91400   18.6200 -113.6400       9.7       190       140        60
OIR    2025250     91400   18.6200 -113.6500       9.9       191       143        60
OIR    2025250     91400   18.6200 -113.6900      12.1       202       142        60
OIR    2025250     91400   18.6200 -113.7000      13.7       203       141        60
OIR    2025250     91400   18.6200 -113.7100      13.9       203       140        60
OIR    2025250     91400   18.6200 -113.7200      13.1       200       141        60
OIR    2025250     91400   18.6200 -113.7300      12.8       199       142        60
OIR    2025250     91400   18.6200 -114.2600      11.6       188       141        60
OIR    2025250     91400   18.6200 -114.2700      11.6       188       141        60
OIR    2025250     91400   18.6200 -114.2800      11.7       188       141        60
OIR    2025250     91400   18.6200 -114.3200      12.4       196       142        60
OIR    2025250     91400   18.6200 -114.3300      12.5       197       140        60
OIR    2025250     91400   18.6200 -114.3400      12.5       197       140        60
OIR    2025250     91400   18.6200 -114.3500      12.5       197       140        60
OIR    2025250     91400   18.6200 -114.3600      12.5       197       141        60
OIR    2025250     91400   18.6200 -114.3800      12.5       197       141        60
OIR    2025250     91400   18.6200 -114.3900      12.5       197       138        60
OIR    2025250     91400   18.6200 -114.4000      12.5       197       138        60
OIR    2025250     91400   18.6200 -114.4100      12.5       197       140        60
OIR    2025250     91400   18.6200 -114.4200      12.5       197       142        60
OIR    2025250     91400   18.6200 -114.4300      12.5       197       142        60
OIR    2025250     91400   18.6200 -114.4400      12.5       198       141        60
OIR    2025250     91400   18.6200 -114.4800      12.3       198       142        60
OIR    2025250     91400   18.6200 -118.3200      14.1        42       139        60
OIR    2025250     91400   18.6200 -118.3300      14.3        41       136        60
OIR    2025250     91400   18.6200 -118.3400      14.6        42       139        60
OIR    2025250     91400   18.6200 -118.3500      15.0        43       144        60
OIR    2025250     91400   18.6100 -110.5000      14.3        56       142        60
OIR    2025250     91400   18.6100 -110.5100      14.3        56       139        60
OIR    2025250     91400   18.6100 -110.5200      14.3        55       135        60
OIR    2025250     91400   18.6100 -110.5300      14.4        55       130        60
OIR    2025250     91400   18.6100 -110.5400      14.5        55       126        60
OIR    2025250     91400   18.6100 -110.5500      15.0        55       126        60
OIR    2025250     91400   18.6100 -110.5600      16.1        55       126        60
OIR    2025250     91400   18.6100 -110.5700      17.4        55       127        60
OIR    2025250     91400   18.6100 -110.5800      17.8        54       127        60
OIR    2025250     91400   18.6100 -110.5900      17.8        54       127        60
OIR    2025250     91400   18.6100 -110.6000      17.8        54       127        60
OIR    2025250     91400   18.6100 -110.6100      17.9        54       128        60
OIR    2025250     91400   18.6100 -110.6200      17.9        55       128        60
OIR    2025250     91400   18.6100 -110.6300      17.9        55       129        60
OIR    2025250     91400   18.6100 -110.6400      17.9        55       129        60
OIR    2025250     91400   18.6100 -110.6500      17.9        55       131        60
OIR    2025250     91400   18.6100 -110.6600      17.9        55       132        60
OIR    2025250     91400   18.6100 -110.6700      17.9        55       134        60
OIR    2025250     91400   18.6100 -110.6800      18.1        55       137        60
OIR    2025250     91400   18.6100 -110.6900      18.2        55       142        60
OIR    2025250     91400   18.6100 -111.3100      17.3        83       143        60
OIR    2025250     91400   18.6100 -111.3200      17.4        83       142        60
OIR    2025250     91400   18.6100 -111.3300      17.4        83       142        60
OIR    2025250     91400   18.6100 -111.3400      17.4        83       141        60
OIR    2025250     91400   18.6100 -111.3500      17.5        83       140        60
OIR    2025250     91400   18.6100 -111.3600      17.5        83       139        60
OIR    2025250     91400   18.6100 -111.3700      17.6        83       139        60
OIR    2025250     91400   18.6100 -111.3800      17.6        82       137        60
OIR    2025250     91400   18.6100 -111.3900      17.5        81       136        60
OIR    2025250     91400   18.6100 -111.4000      17.4        81       138        60
OIR    2025250     91400   18.6100 -111.4100      17.4        81       140        60
OIR    2025250     91400   18.6100 -111.4200      17.4        81       140        60
OIR    2025250     91400   18.6100 -111.4300      17.4        80       137        60
OIR    2025250     91400   18.6100 -111.4400      17.3        80       134        60
OIR    2025250     91400   18.6100 -111.4500      17.1        80       142        60
OIR    2025250     91400   18.6100 -111.8100      11.2        67       140        60
OIR    2025250     91400   18.6100 -111.8200      11.5        67       137        60
OIR    2025250     91400   18.6100 -111.8300      11.6        67       140        60
OIR    2025250     91400   18.6100 -111.8400      11.6        67       143        60
OIR    2025250     91400   18.6100 -113.2400       7.5       147       143        60
OIR    2025250     91400   18.6100 -113.2500       7.5       147       141        60
OIR    2025250     91400   18.6100 -113.2600       7.4       147       139        60
OIR    2025250     91400   18.6100 -113.2700       7.4       147       136        60
OIR    2025250     91400   18.6100 -113.2800       7.4       147       134        60
OIR    2025250     91400   18.6100 -113.2900       7.3       148       134        60
OIR    2025250     91400   18.6100 -113.3000       7.2       148       134        60
OIR    2025250     91400   18.6100 -113.3100       7.2       149       136        60
OIR    2025250     91400   18.6100 -113.3200       7.2       149       138        60
OIR    2025250     91400   18.6100 -113.3300       7.2       149       139        60
OIR    2025250     91400   18.6100 -113.3400       7.2       149       137        60
OIR    2025250     91400   18.6100 -113.3500       7.2       150       135        60
OIR    2025250     91400   18.6100 -113.3600       7.2       150       133        60
OIR    2025250     91400   18.6100 -113.3700       7.2       150       132        60
OIR    2025250     91400   18.6100 -113.3800       7.3       150       133        60
OIR    2025250     91400   18.6100 -113.3900       7.4       152       133        60
OIR    2025250     91400   18.6100 -113.4000       7.6       154       134        60
OIR    2025250     91400   18.6100 -113.4100       7.9       158       135        60
OIR    2025250     91400   18.6100 -113.4200       8.4       166       135        60
OIR    2025250     91400   18.6100 -113.4300       8.7       168       135        60
OIR    2025250     91400   18.6100 -113.4400       8.8       170       135        60
OIR    2025250     91400   18.6100 -113.4500       8.9       171       135        60
OIR    2025250     91400   18.6100 -113.4600       8.9       172       136        60
OIR    2025250     91400   18.6100 -113.4700       9.0       173       135        60
OIR    2025250     91400   18.6100 -113.4800       9.0       174       134        60
OIR    2025250     91400   18.6100 -113.4900       9.0       174       134        60
OIR    2025250     91400   18.6100 -113.5000       8.9       175       134        60
OIR    2025250     91400   18.6100 -113.5100       8.9       175       134        60
OIR    2025250     91400   18.6100 -113.5200       8.9       176       135        60
OIR    2025250     91400   18.6100 -113.5300       8.9       176       135        60
OIR    2025250     91400   18.6100 -113.5400       8.9       177       133        60
OIR    2025250     91400   18.6100 -113.5500       8.8       178       130        60
OIR    2025250     91400   18.6100 -113.5600       8.8       179       128        60
OIR    2025250     91400   18.6100 -113.5700       8.7       181       127        60
OIR    2025250     91400   18.6100 -113.5800       8.7       183       127        60
OIR    2025250     91400   18.6100 -113.5900       8.8       184       128        60
OIR    2025250     91400   18.6100 -113.6000       8.9       184       130        60
OIR    2025250     91400   18.6100 -113.6100       9.0       185       131        60
OIR    2025250     91400   18.6100 -113.6200       9.0       185       132        60
OIR    2025250     91400   18.6100 -113.6300       9.1       186       135        60
OIR    2025250     91400   18.6100 -113.6400       9.2       187       139        60
OIR    2025250     91400   18.6100 -113.6500       9.4       189       143        60
OIR    2025250     91400   18.6100 -113.6600       9.6       195       143        60
OIR    2025250     91400   18.6100 -113.6700      11.4       208       143        60
OIR    2025250     91400   18.6100 -113.6800      13.7       219       142        60
OIR    2025250     91400   18.6100 -113.6900      16.1       221       141        60
OIR    2025250     91400   18.6100 -113.7000      16.5       219       141        60
OIR    2025250     91400   18.6100 -113.7100      17.6       216       141        60
OIR    2025250     91400   18.6100 -113.7200      15.8       211       142        60
OIR    2025250     91400   18.6100 -113.7300      13.9       205       143        60
OIR    2025250     91400   18.6100 -114.2700      11.7       188       142        60
OIR    2025250     91400   18.6100 -114.2800      11.7       189       140        60
OIR    2025250     91400   18.6100 -114.2900      11.8       190       142        60
OIR    2025250     91400   18.6100 -114.3300      12.5       197       142        60
OIR    2025250     91400   18.6100 -114.3400      12.5       197       140        60
OIR    2025250     91400   18.6100 -114.3500      12.5       197       139        60
OIR    2025250     91400   18.6100 -114.3600      12.5       197       140        60
OIR    2025250     91400   18.6100 -114.3700      12.5       197       141        60
OIR    2025250     91400   18.6100 -114.3800      12.5       197       139        60
OIR    2025250     91400   18.6100 -114.3900      12.5       197       136        60
OIR    2025250     91400   18.6100 -114.4000      12.5       197       137        60
OIR    2025250     91400   18.6100 -114.4100      12.5       197       140        60
OIR    2025250     91400   18.6100 -114.4300      12.5       198       142        60
OIR    2025250     91400   18.6100 -114.4400      12.4       198       142        60
OIR    2025250     91400   18.6100 -114.4500      12.4       198       143        60
OIR    2025250     91400   18.6100 -118.3100      13.7        43       142        60
OIR    2025250     91400   18.6100 -118.3200      13.9        42       136        60
OIR    2025250     91400   18.6100 -118.3300      14.2        42       133        60
OIR    2025250     91400   18.6100 -118.3400      14.6        42       135        60
OIR    2025250     91400   18.6100 -118.3500      15.3        43       138        60
OIR    2025250     91400   18.6000 -110.5100      14.3        56       141        60
OIR    2025250     91400   18.6000 -110.5200      14.4        55       137        60
OIR    2025250     91400   18.6000 -110.5300      14.5        55       132        60
OIR    2025250     91400   18.6000 -110.5400      14.5        55       127        60
OIR    2025250     91400   18.6000 -110.5500      15.3        55       127        60
OIR    2025250     91400   18.6000 -110.5600      16.4        54       126        60
OIR    2025250     91400   18.6000 -110.5700      17.4        54       126        60
OIR    2025250     91400   18.6000 -110.5800      17.7        54       126        60
OIR    2025250     91400   18.6000 -110.5900      17.8        54       127        60
OIR    2025250     91400   18.6000 -110.6000      17.8        55       127        60
OIR    2025250     91400   18.6000 -110.6100      17.8        55       127        60
OIR    2025250     91400   18.6000 -110.6200      17.9        55       128        60
OIR    2025250     91400   18.6000 -110.6300      17.9        55       128        60
OIR    2025250     91400   18.6000 -110.6400      17.9        55       129        60
OIR    2025250     91400   18.6000 -110.6500      17.9        55       130        60
OIR    2025250     91400   18.6000 -110.6600      17.9        55       131        60
OIR    2025250     91400   18.6000 -110.6700      17.9        55       132        60
OIR    2025250     91400   18.6000 -110.6800      18.0        55       134        60
OIR    2025250     91400   18.6000 -110.6900      18.2        55       139        60
OIR    2025250     91400   18.6000 -111.2300      17.1        82       143        60
OIR    2025250     91400   18.6000 -111.2900      17.3        83       143        60
OIR    2025250     91400   18.6000 -111.3000      17.3        83       140        60
OIR    2025250     91400   18.6000 -111.3100      17.3        83       139        60
OIR    2025250     91400   18.6000 -111.3200      17.4        83       138        60
OIR    2025250     91400   18.6000 -111.3300      17.4        83       137        60
OIR    2025250     91400   18.6000 -111.3400      17.4        83       137        60
OIR    2025250     91400   18.6000 -111.3500      17.4        83       137        60
OIR    2025250     91400   18.6000 -111.3600      17.5        83       136        60
OIR    2025250     91400   18.6000 -111.3700      17.5        82       136        60
OIR    2025250     91400   18.6000 -111.3800      17.4        82       135        60
OIR    2025250     91400   18.6000 -111.3900      17.4        81       134        60
OIR    2025250     91400   18.6000 -111.4000      17.4        81       136        60
OIR    2025250     91400   18.6000 -111.4100      17.4        81       139        60
OIR    2025250     91400   18.6000 -111.4200      17.4        80       140        60
OIR    2025250     91400   18.6000 -111.4300      17.3        80       134        60
OIR    2025250     91400   18.6000 -111.4400      17.2        80       128        60
OIR    2025250     91400   18.6000 -111.4500      16.8        78       133        60
OIR    2025250     91400   18.6000 -111.8100      10.8        67       140        60
OIR    2025250     91400   18.6000 -111.8200      11.5        67       135        60
OIR    2025250     91400   18.6000 -111.8300      11.6        67       135        60
OIR    2025250     91400   18.6000 -111.8400      11.5        66       136        60
OIR    2025250     91400   18.6000 -111.8500      11.5        66       142        60
OIR    2025250     91400   18.6000 -113.2300       7.5       147       142        60
OIR    2025250     91400   18.6000 -113.2400       7.5       147       139        60
OIR    2025250     91400   18.6000 -113.2500       7.5       147       137        60
OIR    2025250     91400   18.6000 -113.2600       7.4       147       135        60
OIR    2025250     91400   18.6000 -113.2700       7.4       147       134        60
OIR    2025250     91400   18.6000 -113.2800       7.3       147       132        60
OIR    2025250     91400   18.6000 -113.2900       7.2       148       133        60
OIR    2025250     91400   18.6000 -113.3000       7.2       148       134        60
OIR    2025250     91400   18.6000 -113.3100       7.2       149       135        60
OIR    2025250     91400   18.6000 -113.3200       7.2       149       136        60
OIR    2025250     91400   18.6000 -113.3300       7.2       149       137        60
OIR    2025250     91400   18.6000 -113.3400       7.2       149       135        60
OIR    2025250     91400   18.6000 -113.3500       7.2       150       133        60
OIR    2025250     91400   18.6000 -113.3600       7.2       150       132        60
OIR    2025250     91400   18.6000 -113.3700       7.2       150       132        60
OIR    2025250     91400   18.6000 -113.3800       7.2       150       132        60
OIR    2025250     91400   18.6000 -113.3900       7.3       151       133        60
OIR    2025250     91400   18.6000 -113.4000       7.4       153       133        60
OIR    2025250     91400   18.6000 -113.4100       7.7       156       133        60
OIR    2025250     91400   18.6000 -113.4200       8.1       165       133        60
OIR    2025250     91400   18.6000 -113.4300       8.5       168       132        60
OIR    2025250     91400   18.6000 -113.4400       8.7       170       132        60
OIR    2025250     91400   18.6000 -113.4500       8.8       171       132        60
OIR    2025250     91400   18.6000 -113.4600       8.8       172       133        60
OIR    2025250     91400   18.6000 -113.4700       8.9       173       134        60
OIR    2025250     91400   18.6000 -113.4800       8.9       174       134        60
OIR    2025250     91400   18.6000 -113.4900       8.9       175       133        60
OIR    2025250     91400   18.6000 -113.5000       8.9       175       132        60
OIR    2025250     91400   18.6000 -113.5100       8.9       176       131        60
OIR    2025250     91400   18.6000 -113.5200       8.8       176       132        60
OIR    2025250     91400   18.6000 -113.5300       8.8       177       134        60
OIR    2025250     91400   18.6000 -113.5400       8.7       178       134        60
OIR    2025250     91400   18.6000 -113.5500       8.7       179       132        60
OIR    2025250     91400   18.6000 -113.5600       8.5       181       129        60
OIR    2025250     91400   18.6000 -113.5700       8.5       182       127        60
OIR    2025250     91400   18.6000 -113.5800       8.6       183       124        60
OIR    2025250     91400   18.6000 -113.5900       8.7       183       127        60
OIR    2025250     91400   18.6000 -113.6000       8.8       184       131        60
OIR    2025250     91400   18.6000 -113.6100       8.9       184       131        60
OIR    2025250     91400   18.6000 -113.6200       9.0       184       132        60
OIR    2025250     91400   18.6000 -113.6300       9.0       185       134        60
OIR    2025250     91400   18.6000 -113.6400       9.0       186       137        60
OIR    2025250     91400   18.6000 -113.6500       8.9       190       141        60
OIR    2025250     91400   18.6000 -113.6600       9.7       200       137        60
OIR    2025250     91400   18.6000 -113.6700      13.8       224       134        60
OIR    2025250     91400   18.6000 -113.6800      17.2       232       136        60
OIR    2025250     91400   18.6000 -113.6900      19.2       230       139        60
OIR    2025250     91400   18.6000 -113.7000      19.8       226       141        60
OIR    2025250     91400   18.6000 -113.7100      20.2       224       142        60
OIR    2025250     91400   18.6000 -113.7200      18.8       221       143        60
OIR    2025250     91400   18.6000 -113.7300      16.1       213       143        60
OIR    2025250     91400   18.6000 -113.7400      13.9       206       143        60
OIR    2025250     91400   18.6000 -114.2100      11.4       185       140        60
OIR    2025250     91400   18.6000 -114.2200      11.5       185       139        60
OIR    2025250     91400   18.6000 -114.2300      11.5       186       141        60
OIR    2025250     91400   18.6000 -114.2800      11.8       190       140        60
OIR    2025250     91400   18.6000 -114.2900      11.9       192       141        60
OIR    2025250     91400   18.6000 -114.3500      12.5       197       141        60
OIR    2025250     91400   18.6000 -114.3600      12.5       197       140        60
OIR    2025250     91400   18.6000 -114.3700      12.5       197       140        60
OIR    2025250     91400   18.6000 -114.3800      12.5       197       139        60
OIR    2025250     91400   18.6000 -114.3900      12.5       197       137        60
OIR    2025250     91400   18.6000 -114.4000      12.5       197       136        60
OIR    2025250     91400   18.6000 -114.4100      12.4       198       140        60
OIR    2025250     91400   18.6000 -114.4300      12.4       198       142        60
OIR    2025250     91400   18.6000 -114.4400      12.3       199       141        60
OIR    2025250     91400   18.6000 -114.4500      12.2       199       141        60
OIR    2025250     91400   18.6000 -114.4600      12.2       200       143        60
OIR    2025250     91400   18.6000 -118.3100      15.1        42       143        60
OIR    2025250     91400   18.6000 -118.3200      15.4        39       142        60
OIR    2025250     91400   18.6000 -118.3300      16.1        38       140        60
OIR    2025250     91400   18.6000 -118.3400      16.9        38       139        60
OIR    2025250     91400   18.6000 -118.3500      17.2        38       138        60
OIR    2025250     91400   18.5900 -110.5100      14.3        55       142        60
OIR    2025250     91400   18.5900 -110.5200      14.4        55       138        60
OIR    2025250     91400   18.5900 -110.5300      14.5        55       134        60
OIR    2025250     91400   18.5900 -110.5400      14.7        55       129        60
OIR    2025250     91400   18.5900 -110.5500      15.8        55       127        60
OIR    2025250     91400   18.5900 -110.5600      16.4        55       126        60
OIR    2025250     91400   18.5900 -110.5700      17.3        54       126        60
OIR    2025250     91400   18.5900 -110.5800      17.7        55       126        60
OIR    2025250     91400   18.5900 -110.5900      17.8        55       126        60
OIR    2025250     91400   18.5900 -110.6000      17.8        55       126        60
OIR    2025250     91400   18.5900 -110.6100      17.8        55       126        60
OIR    2025250     91400   18.5900 -110.6200      17.8        55       127        60
OIR    2025250     91400   18.5900 -110.6300      17.9        55       128        60
OIR    2025250     91400   18.5900 -110.6400      17.9        55       129        60
OIR    2025250     91400   18.5900 -110.6500      17.9        55       129        60
OIR    2025250     91400   18.5900 -110.6600      17.9        55       130        60
OIR    2025250     91400   18.5900 -110.6700      17.9        55       131        60
OIR    2025250     91400   18.5900 -110.6800      18.0        55       132        60
OIR    2025250     91400   18.5900 -110.6900      18.2        55       134        60
OIR    2025250     91400   18.5900 -110.7000      18.3        55       139        60
OIR    2025250     91400   18.5900 -111.2300      17.1        82       142        60
OIR    2025250     91400   18.5900 -111.2400      17.2        82       143        60
OIR    2025250     91400   18.5900 -111.2900      17.3        82       141        60
OIR    2025250     91400   18.5900 -111.3000      17.3        82       139        60
OIR    2025250     91400   18.5900 -111.3100      17.3        82       136        60
OIR    2025250     91400   18.5900 -111.3200      17.4        83       134        60
OIR    2025250     91400   18.5900 -111.3300      17.4        83       132        60
OIR    2025250     91400   18.5900 -111.3400      17.4        82       133        60
OIR    2025250     91400   18.5900 -111.3500      17.4        82       133        60
OIR    2025250     91400   18.5900 -111.3600      17.4        82       134        60
OIR    2025250     91400   18.5900 -111.3700      17.3        81       134        60
OIR    2025250     91400   18.5900 -111.3800      17.3        81       133        60
OIR    2025250     91400   18.5900 -111.3900      17.3        81       131        60
OIR    2025250     91400   18.5900 -111.4000      17.3        81       131        60
OIR    2025250     91400   18.5900 -111.4100      17.3        80       137        60
OIR    2025250     91400   18.5900 -111.4200      17.3        80       141        60
OIR    2025250     91400   18.5900 -111.4300      17.2        80       137        60
OIR    2025250     91400   18.5900 -111.4400      17.0        79       132        60
OIR    2025250     91400   18.5900 -111.4500      16.6        77       132        60
OIR    2025250     91400   18.5900 -111.4600      16.3        76       141        60
OIR    2025250     91400   18.5900 -111.8100      10.1        67       142        60
OIR    2025250     91400   18.5900 -111.8200      11.2        67       134        60
OIR    2025250     91400   18.5900 -111.8300      11.4        67       132        60
OIR    2025250     91400   18.5900 -111.8400      11.3        66       130        60
OIR    2025250     91400   18.5900 -111.8500      11.2        66       135        60
OIR    2025250     91400   18.5900 -113.2200       7.5       147       142        60
OIR    2025250     91400   18.5900 -113.2300       7.5       148       139        60
OIR    2025250     91400   18.5900 -113.2400       7.4       148       136        60
OIR    2025250     91400   18.5900 -113.2500       7.4       148       134        60
OIR    2025250     91400   18.5900 -113.2600       7.4       147       132        60
OIR    2025250     91400   18.5900 -113.2700       7.3       147       132        60
OIR    2025250     91400   18.5900 -113.2800       7.3       148       132        60
OIR    2025250     91400   18.5900 -113.2900       7.2       148       133        60
OIR    2025250     91400   18.5900 -113.3000       7.1       149       135        60
OIR    2025250     91400   18.5900 -113.3100       7.1       149       135        60
OIR    2025250     91400   18.5900 -113.3200       7.1       149       134        60
OIR    2025250     91400   18.5900 -113.3300       7.1       149       134        60
OIR    2025250     91400   18.5900 -113.3400       7.1       149       133        60
OIR    2025250     91400   18.5900 -113.3500       7.2       150       132        60
OIR    2025250     91400   18.5900 -113.3600       7.2       150       132        60
OIR    2025250     91400   18.5900 -113.3700       7.2       150       133        60
OIR    2025250     91400   18.5900 -113.3800       7.2       150       133        60
OIR    2025250     91400   18.5900 -113.3900       7.2       151       134        60
OIR    2025250     91400   18.5900 -113.4000       7.3       152       135        60
OIR    2025250     91400   18.5900 -113.4100       7.5       155       135        60
OIR    2025250     91400   18.5900 -113.4200       7.9       163       135        60
OIR    2025250     91400   18.5900 -113.4300       8.3       167       133        60
OIR    2025250     91400   18.5900 -113.4400       8.5       170       132        60
OIR    2025250     91400   18.5900 -113.4500       8.7       171       131        60
OIR    2025250     91400   18.5900 -113.4600       8.7       173       132        60
OIR    2025250     91400   18.5900 -113.4700       8.8       174       133        60
OIR    2025250     91400   18.5900 -113.4800       8.8       174       133        60
OIR    2025250     91400   18.5900 -113.4900       8.8       175       133        60
OIR    2025250     91400   18.5900 -113.5000       8.8       176       132        60
OIR    2025250     91400   18.5900 -113.5100       8.8       176       131        60
OIR    2025250     91400   18.5900 -113.5200       8.7       177       131        60
OIR    2025250     91400   18.5900 -113.5300       8.6       178       131        60
OIR    2025250     91400   18.5900 -113.5400       8.4       179       131        60
OIR    2025250     91400   18.5900 -113.5500       8.3       180       130        60
OIR    2025250     91400   18.5900 -113.5600       8.3       182       128        60
OIR    2025250     91400   18.5900 -113.5700       8.3       183       127        60
OIR    2025250     91400   18.5900 -113.5800       8.3       183       126        60
OIR    2025250     91400   18.5900 -113.5900       8.5       183       128        60
OIR    2025250     91400   18.5900 -113.6000       8.6       183       132        60
OIR    2025250     91400   18.5900 -113.6100       8.7       183       132        60
OIR    2025250     91400   18.5900 -113.6200       8.8       184       131        60
OIR    2025250     91400   18.5900 -113.6300       8.9       185       131        60
OIR    2025250     91400   18.5900 -113.6400       8.2       191       133        60
OIR    2025250     91400   18.5900 -113.6500       7.7       199       134        60
OIR    2025250     91400   18.5900 -113.6600      10.3       229       131        60
OIR    2025250     91400   18.5900 -113.6700      15.3       246       128        60
OIR    2025250     91400   18.5900 -113.6800      18.4       248       129        60
OIR    2025250     91400   18.5900 -113.6900      19.8       242       134        60
OIR    2025250     91400   18.5900 -113.7000      20.9       235       138        60
OIR    2025250     91400   18.5900 -113.7100      21.4       230       141        60
OIR    2025250     91400   18.5900 -113.7200      20.9       227       143        60
OIR    2025250     91400   18.5900 -113.7300      18.5       221       142        60
OIR    2025250     91400   18.5900 -113.7400      15.0       211       141        60
OIR    2025250     91400   18.5900 -113.7500      13.4       206       142        60
OIR    2025250     91400   18.5900 -114.2100      11.5       185       141        60
OIR    2025250     91400   18.5900 -114.2200      11.5       185       138        60
OIR    2025250     91400   18.5900 -114.2300      11.6       186       139        60
OIR    2025250     91400   18.5900 -114.2400      11.6       186       141        60
OIR    2025250     91400   18.5900 -114.2800      12.0       191       143        60
OIR    2025250     91400   18.5900 -114.2900      12.1       193       142        60
OIR    2025250     91400   18.5900 -114.3000      12.3       195       142        60
OIR    2025250     91400   18.5900 -114.3500      12.5       197       142        60
OIR    2025250     91400   18.5900 -114.3600      12.5       197       141        60
OIR    2025250     91400   18.5900 -114.3700      12.5       197       140        60
OIR    2025250     91400   18.5900 -114.3800      12.5       197       139        60
OIR    2025250     91400   18.5900 -114.3900      12.4       198       138        60
OIR    2025250     91400   18.5900 -114.4000      12.4       198       137        60
OIR    2025250     91400   18.5900 -114.4100      12.4       198       139        60
OIR    2025250     91400   18.5900 -114.4200      12.3       199       142        60
OIR    2025250     91400   18.5900 -114.4300      12.2       199       141        60
OIR    2025250     91400   18.5900 -114.4400      12.1       200       140        60
OIR    2025250     91400   18.5900 -114.4500      12.0       201       140        60
OIR    2025250     91400   18.5900 -114.4600      12.0       202       141        60
OIR    2025250     91400   18.5900 -114.4700      11.8       203       143        60
OIR    2025250     91400   18.5900 -118.3100      13.3        55       141        60
OIR    2025250     91400   18.5900 -118.3500      17.0        38       143        60
OIR    2025250     91400   18.5800 -110.5200      14.4        55       138        60
OIR    2025250     91400   18.5800 -110.5300      14.6        55       134        60
OIR    2025250     91400   18.5800 -110.5400      15.1        55       130        60
OIR    2025250     91400   18.5800 -110.5500      16.0        55       127        60
OIR    2025250     91400   18.5800 -110.5600      16.5        55       126        60
OIR    2025250     91400   18.5800 -110.5700      17.3        55       126        60
OIR    2025250     91400   18.5800 -110.5800      17.7        55       125        60
OIR    2025250     91400   18.5800 -110.5900      17.7        55       125        60
OIR    2025250     91400   18.5800 -110.6000      17.8        55       126        60
OIR    2025250     91400   18.5800 -110.6100      17.8        55       126        60
OIR    2025250     91400   18.5800 -110.6200      17.8        55       127        60
OIR    2025250     91400   18.5800 -110.6300      17.8        55       128        60
OIR    2025250     91400   18.5800 -110.6400      17.8        55       129        60
OIR    2025250     91400   18.5800 -110.6500      17.8        55       129        60
OIR    2025250     91400   18.5800 -110.6600      17.8        55       130        60
OIR    2025250     91400   18.5800 -110.6700      17.9        55       131        60
OIR    2025250     91400   18.5800 -110.6800      17.9        55       131        60
OIR    2025250     91400   18.5800 -110.6900      18.1        55       133        60
OIR    2025250     91400   18.5800 -110.7000      18.3        55       137        60
OIR    2025250     91400   18.5800 -110.7100      18.4        55       141        60
OIR    2025250     91400   18.5800 -111.2100      16.8        81       143        60
OIR    2025250     91400   18.5800 -111.2200      17.1        81       141        60
OIR    2025250     91400   18.5800 -111.2300      17.1        82       140        60
OIR    2025250     91400   18.5800 -111.2400      17.2        82       139        60
OIR    2025250     91400   18.5800 -111.2500      17.3        82       138        60
OIR    2025250     91400   18.5800 -111.2600      17.3        82       139        60
OIR    2025250     91400   18.5800 -111.2700      17.3        82       141        60
OIR    2025250     91400   18.5800 -111.2900      17.3        82       141        60
OIR    2025250     91400   18.5800 -111.3000      17.3        82       138        60
OIR    2025250     91400   18.5800 -111.3100      17.3        81       136        60
OIR    2025250     91400   18.5800 -111.3200      17.3        81       134        60
OIR    2025250     91400   18.5800 -111.3300      17.3        81       132        60
OIR    2025250     91400   18.5800 -111.3400      17.3        81       131        60
OIR    2025250     91400   18.5800 -111.3500      17.3        81       131        60
OIR    2025250     91400   18.5800 -111.3600      17.3        81       131        60
OIR    2025250     91400   18.5800 -111.3700      17.3        81       132        60
OIR    2025250     91400   18.5800 -111.3800      17.3        81       131        60
OIR    2025250     91400   18.5800 -111.3900      17.3        81       129        60
OIR    2025250     91400   18.5800 -111.4000      17.3        80       127        60
OIR    2025250     91400   18.5800 -111.4100      17.2        80       134        60
OIR    2025250     91400   18.5800 -111.4200      17.2        80       140        60
OIR    2025250     91400   18.5800 -111.4300      17.0        79       138        60
OIR    2025250     91400   18.5800 -111.4400      16.7        78       135        60
OIR    2025250     91400   18.5800 -111.4500      16.4        77       132        60
OIR    2025250     91400   18.5800 -111.4600      16.3        76       139        60
OIR    2025250     91400   18.5800 -111.8200      10.5        67       139        60
OIR    2025250     91400   18.5800 -111.8300      11.1        66       136        60
OIR    2025250     91400   18.5800 -111.8400      11.0        66       135        60
OIR    2025250     91400   18.5800 -111.8500      10.9        65       137        60
OIR    2025250     91400   18.5800 -111.8600      10.5        63       143        60
OIR    2025250     91400   18.5800 -113.2200       7.5       148       140        60
OIR    2025250     91400   18.5800 -113.2300       7.4       148       137        60
OIR    2025250     91400   18.5800 -113.2400       7.4       148       134        60
OIR    2025250     91400   18.5800 -113.2500       7.4       148       133        60
OIR    2025250     91400   18.5800 -113.2600       7.3       148       131        60
OIR    2025250     91400   18.5800 -113.2700       7.3       148       131        60
OIR    2025250     91400   18.5800 -113.2800       7.2       148       131        60
OIR    2025250     91400   18.5800 -113.2900       7.1       148       133        60
OIR    2025250     91400   18.5800 -113.3000       7.1       149       135        60
OIR    2025250     91400   18.5800 -113.3100       7.1       149       136        60
OIR    2025250     91400   18.5800 -113.3200       7.1       149       134        60
OIR    2025250     91400   18.5800 -113.3300       7.1       149       133        60
OIR    2025250     91400   18.5800 -113.3400       7.1       149       132        60
OIR    2025250     91400   18.5800 -113.3500       7.1       150       132        60
OIR    2025250     91400   18.5800 -113.3600       7.1       150       132        60
OIR    2025250     91400   18.5800 -113.3700       7.2       150       132        60
OIR    2025250     91400   18.5800 -113.3800       7.2       150       132        60
OIR    2025250     91400   18.5800 -113.3900       7.2       151       134        60
OIR    2025250     91400   18.5800 -113.4000       7.2       152       135        60
OIR    2025250     91400   18.5800 -113.4100       7.3       154       136        60
OIR    2025250     91400   18.5800 -113.4200       7.6       161       136        60
OIR    2025250     91400   18.5800 -113.4300       8.0       166       134        60
OIR    2025250     91400   18.5800 -113.4400       8.3       169       132        60
OIR    2025250     91400   18.5800 -113.4500       8.5       171       131        60
OIR    2025250     91400   18.5800 -113.4600       8.6       173       131        60
OIR    2025250     91400   18.5800 -113.4700       8.7       174       132        60
OIR    2025250     91400   18.5800 -113.4800       8.7       175       132        60
OIR    2025250     91400   18.5800 -113.4900       8.7       176       132        60
OIR    2025250     91400   18.5800 -113.5000       8.7       176       132        60
OIR    2025250     91400   18.5800 -113.5100       8.6       177       132        60
OIR    2025250     91400   18.5800 -113.5200       8.4       179       130        60
OIR    2025250     91400   18.5800 -113.5300       8.0       180       128        60
OIR    2025250     91400   18.5800 -113.5400       7.8       182       127        60
OIR    2025250     91400   18.5800 -113.5500       7.7       182       126        60
OIR    2025250     91400   18.5800 -113.5600       7.7       183       126        60
OIR    2025250     91400   18.5800 -113.5700       7.9       183       127        60
OIR    2025250     91400   18.5800 -113.5800       8.0       183       129        60
OIR    2025250     91400   18.5800 -113.5900       8.2       183       131        60
OIR    2025250     91400   18.5800 -113.6000       8.3       182       133        60
OIR    2025250     91400   18.5800 -113.6100       8.4       182       133        60
OIR    2025250     91400   18.5800 -113.6200       8.3       184       130        60
OIR    2025250     91400   18.5800 -113.6300       7.6       192       128        60
OIR    2025250     91400   18.5800 -113.6400       7.2       200       125        60
OIR    2025250     91400   18.5800 -113.6500       7.2       230       123        60
OIR    2025250     91400   18.5800 -113.6600      13.3       263       122        60
OIR    2025250     91400   18.5800 -113.6700      16.8       265       122        60
OIR    2025250     91400   18.5800 -113.6800      18.4       260       124        60
OIR    2025250     91400   18.5800 -113.6900      18.9       253       128        60
OIR    2025250     91400   18.5800 -113.7000      19.8       244       132        60
OIR    2025250     91400   18.5800 -113.7100      20.9       235       137        60
OIR    2025250     91400   18.5800 -113.7200      20.7       231       142        60
OIR    2025250     91400   18.5800 -113.7300      19.1       225       141        60
OIR    2025250     91400   18.5800 -113.7400      15.6       216       140        60
OIR    2025250     91400   18.5800 -113.7500      13.4       208       140        60
OIR    2025250     91400   18.5800 -113.7600      12.9       206       142        60
OIR    2025250     91400   18.5800 -113.7700      12.7       204       142        60
OIR    2025250     91400   18.5800 -113.7800      12.6       204       142        60
OIR    2025250     91400   18.5800 -113.7900      12.4       202       142        60
OIR    2025250     91400   18.5800 -114.2100      11.5       185       142        60
OIR    2025250     91400   18.5800 -114.2200      11.6       185       139        60
OIR    2025250     91400   18.5800 -114.2300      11.6       186       139        60
OIR    2025250     91400   18.5800 -114.2400      11.7       186       139        60
OIR    2025250     91400   18.5800 -114.2500      11.8       187       140        60
OIR    2025250     91400   18.5800 -114.3000      12.4       196       141        60
OIR    2025250     91400   18.5800 -114.3100      12.5       197       139        60
OIR    2025250     91400   18.5800 -114.3200      12.5       197       139        60
OIR    2025250     91400   18.5800 -114.3300      12.5       197       140        60
OIR    2025250     91400   18.5800 -114.3400      12.5       197       141        60
OIR    2025250     91400   18.5800 -114.3500      12.5       197       142        60
OIR    2025250     91400   18.5800 -114.3700      12.5       197       141        60
OIR    2025250     91400   18.5800 -114.3800      12.4       198       139        60
OIR    2025250     91400   18.5800 -114.3900      12.4       198       139        60
OIR    2025250     91400   18.5800 -114.4000      12.4       198       139        60
OIR    2025250     91400   18.5800 -114.4100      12.3       199       139        60
OIR    2025250     91400   18.5800 -114.4200      12.2       200       139        60
OIR    2025250     91400   18.5800 -114.4300      12.0       201       140        60
OIR    2025250     91400   18.5800 -114.4400      12.0       202       142        60
OIR    2025250     91400   18.5800 -114.4600      11.8       204       142        60
OIR    2025250     91400   18.5800 -114.4700      11.7       204       141        60
OIR    2025250     91400   18.5700 -110.5200      14.5        54       138        60
OIR    2025250     91400   18.5700 -110.5300      14.8        55       134        60
OIR    2025250     91400   18.5700 -110.5400      15.2        55       130        60
OIR    2025250     91400   18.5700 -110.5500      16.1        56       127        60
OIR    2025250     91400   18.5700 -110.5600      16.6        56       126        60
OIR    2025250     91400   18.5700 -110.5700      17.3        55       125        60
OIR    2025250     91400   18.5700 -110.5800      17.6        55       125        60
OIR    2025250     91400   18.5700 -110.5900      17.7        55       125        60
OIR    2025250     91400   18.5700 -110.6000      17.8        55       125        60
OIR    2025250     91400   18.5700 -110.6100      17.8        55       126        60
OIR    2025250     91400   18.5700 -110.6200      17.8        55       127        60
OIR    2025250     91400   18.5700 -110.6300      17.8        55       128        60
OIR    2025250     91400   18.5700 -110.6400      17.8        55       129        60
OIR    2025250     91400   18.5700 -110.6500      17.8        55       130        60
OIR    2025250     91400   18.5700 -110.6600      17.8        55       131        60
OIR    2025250     91400   18.5700 -110.6700      17.8        55       132        60
OIR    2025250     91400   18.5700 -110.6800      17.8        55       132        60
OIR    2025250     91400   18.5700 -110.6900      17.9        55       132        60
OIR    2025250     91400   18.5700 -110.7000      18.1        55       136        60
OIR    2025250     91400   18.5700 -110.7100      18.4        55       141        60
OIR    2025250     91400   18.5700 -111.2100      17.2        80       142        60
OIR    2025250     91400   18.5700 -111.2200      17.2        81       139        60
OIR    2025250     91400   18.5700 -111.2300      17.3        81       137        60
OIR    2025250     91400   18.5700 -111.2400      17.3        81       134        60
OIR    2025250     91400   18.5700 -111.2500      17.3        81       132        60
OIR    2025250     91400   18.5700 -111.2600      17.3        81       130        60
OIR    2025250     91400   18.5700 -111.2700      17.4        81       135        60
OIR    2025250     91400   18.5700 -111.2800      17.3        81       141        60
OIR    2025250     91400   18.5700 -111.2900      17.3        81       141        60
OIR    2025250     91400   18.5700 -111.3000      17.3        81       139        60
OIR    2025250     91400   18.5700 -111.3100      17.3        81       136        60
OIR    2025250     91400   18.5700 -111.3200      17.3        81       135        60
OIR    2025250     91400   18.5700 -111.3300      17.3        81       134        60
OIR    2025250     91400   18.5700 -111.3400      17.3        81       132        60
OIR    2025250     91400   18.5700 -111.3500      17.3        81       131        60
OIR    2025250     91400   18.5700 -111.3600      17.2        81       130        60
OIR    2025250     91400   18.5700 -111.3700      17.2        81       129        60
OIR    2025250     91400   18.5700 -111.3800      17.2        80       128        60
OIR    2025250     91400   18.5700 -111.3900      17.2        80       128        60
OIR    2025250     91400   18.5700 -111.4000      17.2        80       127        60
OIR    2025250     91400   18.5700 -111.4100      17.1        80       131        60
OIR    2025250     91400   18.5700 -111.4200      16.9        79       136        60
OIR    2025250     91400   18.5700 -111.4300      16.7        78       137        60
OIR    2025250     91400   18.5700 -111.4400      16.5        77       136        60
OIR    2025250     91400   18.5700 -111.4500      16.3        77       134        60
OIR    2025250     91400   18.5700 -111.4600      16.3        76       135        60
OIR    2025250     91400   18.5700 -111.4700      16.2        76       136        60
OIR    2025250     91400   18.5700 -111.4800      16.2        76       140        60
OIR    2025250     91400   18.5700 -111.5200      15.4        75       142        60
OIR    2025250     91400   18.5700 -111.8200       9.3        68       142        60
OIR    2025250     91400   18.5700 -111.8300      10.2        67       140        60
OIR    2025250     91400   18.5700 -111.8400      10.5        65       140        60
OIR    2025250     91400   18.5700 -111.8500      10.0        64       141        60
OIR    2025250     91400   18.5700 -111.8600       9.9        62       142        60
OIR    2025250     91400   18.5700 -113.2100       7.5       149       143        60
OIR    2025250     91400   18.5700 -113.2200       7.4       149       138        60
OIR    2025250     91400   18.5700 -113.2300       7.4       149       135        60
OIR    2025250     91400   18.5700 -113.2400       7.3       148       133        60
OIR    2025250     91400   18.5700 -113.2500       7.3       148       131        60
OIR    2025250     91400   18.5700 -113.2600       7.3       148       130        60
OIR    2025250     91400   18.5700 -113.2700       7.2       148       129        60
OIR    2025250     91400   18.5700 -113.2800       7.1       148       130        60
OIR    2025250     91400   18.5700 -113.2900       7.1       148       132        60
OIR    2025250     91400   18.5700 -113.3000       7.1       149       134        60
OIR    2025250     91400   18.5700 -113.3100       7.0       149       135        60
OIR    2025250     91400   18.5700 -113.3200       7.0       149       135        60
OIR    2025250     91400   18.5700 -113.3300       7.1       149       134        60
OIR    2025250     91400   18.5700 -113.3400       7.1       150       134        60
OIR    2025250     91400   18.5700 -113.3500       7.1       150       134        60
OIR    2025250     91400   18.5700 -113.3600       7.1       150       133        60
OIR    2025250     91400   18.5700 -113.3700       7.1       150       130        60
OIR    2025250     91400   18.5700 -113.3800       7.1       150       128        60
OIR    2025250     91400   18.5700 -113.3900       7.1       151       130        60
OIR    2025250     91400   18.5700 -113.4000       7.2       151       134        60
OIR    2025250     91400   18.5700 -113.4100       7.2       153       134        60
OIR    2025250     91400   18.5700 -113.4200       7.4       158       134        60
OIR    2025250     91400   18.5700 -113.4300       7.7       164       133        60
OIR    2025250     91400   18.5700 -113.4400       8.1       168       133        60
OIR    2025250     91400   18.5700 -113.4500       8.3       171       132        60
OIR    2025250     91400   18.5700 -113.4600       8.5       173       132        60
OIR    2025250     91400   18.5700 -113.4700       8.6       174       132        60
OIR    2025250     91400   18.5700 -113.4800       8.6       175       131        60
OIR    2025250     91400   18.5700 -113.4900       8.6       176       131        60
OIR    2025250     91400   18.5700 -113.5000       8.5       178       131        60
OIR    2025250     91400   18.5700 -113.5100       8.3       179       130        60
OIR    2025250     91400   18.5700 -113.5200       7.9       182       130        60
OIR    2025250     91400   18.5700 -113.5300       7.7       183       129        60
OIR    2025250     91400   18.5700 -113.5400       7.5       183       128        60
OIR    2025250     91400   18.5700 -113.5500       7.5       183       127        60
OIR    2025250     91400   18.5700 -113.5600       7.6       183       126        60
OIR    2025250     91400   18.5700 -113.5700       7.7       183       127        60
OIR    2025250     91400   18.5700 -113.5800       7.9       182       129        60
OIR    2025250     91400   18.5700 -113.5900       8.0       182       131        60
OIR    2025250     91400   18.5700 -113.6000       8.0       182       132        60
OIR    2025250     91400   18.5700 -113.6100       8.0       182       133        60
OIR    2025250     91400   18.5700 -113.6200       7.7       184       130        60
OIR    2025250     91400   18.5700 -113.6300       5.8       194       126        60
OIR    2025250     91400   18.5700 -113.6400       4.2       215       122        60
OIR    2025250     91400   18.5700 -113.6500       9.0       274       116        60
OIR    2025250     91400   18.5700 -113.6600      14.6       274       116        60
OIR    2025250     91400   18.5700 -113.6700      16.9       269       117        60
OIR    2025250     91400   18.5700 -113.6800      17.8       264       121        60
OIR    2025250     91400   18.5700 -113.6900      18.0       259       123        60
OIR    2025250     91400   18.5700 -113.7000      18.1       253       126        60
OIR    2025250     91400   18.5700 -113.7100      18.9       244       132        60
OIR    2025250     91400   18.5700 -113.7200      19.4       235       137        60
OIR    2025250     91400   18.5700 -113.7300      18.3       229       139        60
OIR    2025250     91400   18.5700 -113.7400      15.4       221       139        60
OIR    2025250     91400   18.5700 -113.7500      13.3       212       139        60
OIR    2025250     91400   18.5700 -113.7600      12.7       207       140        60
OIR    2025250     91400   18.5700 -113.7700      12.5       205       140        60
OIR    2025250     91400   18.5700 -113.7800      12.4       204       140        60
OIR    2025250     91400   18.5700 -113.7900      12.3       203       140        60
OIR    2025250     91400   18.5700 -113.8600      11.4       185       140        60
OIR    2025250     91400   18.5700 -114.2100      11.6       185       143        60
OIR    2025250     91400   18.5700 -114.2200      11.6       185       142        60
OIR    2025250     91400   18.5700 -114.2300      11.6       186       142        60
OIR    2025250     91400   18.5700 -114.2400      11.7       186       142        60
OIR    2025250     91400   18.5700 -114.2500      11.8       188       143        60
OIR    2025250     91400   18.5700 -114.3000      12.5       196       142        60
OIR    2025250     91400   18.5700 -114.3100      12.5       197       138        60
OIR    2025250     91400   18.5700 -114.3200      12.5       197       138        60
OIR    2025250     91400   18.5700 -114.3300      12.5       197       138        60
OIR    2025250     91400   18.5700 -114.3400      12.5       197       138        60
OIR    2025250     91400   18.5700 -114.3500      12.5       197       141        60
OIR    2025250     91400   18.5700 -114.3700      12.4       198       141        60
OIR    2025250     91400   18.5700 -114.3800      12.4       198       140        60
OIR    2025250     91400   18.5700 -114.3900      12.4       199       140        60
OIR    2025250     91400   18.5700 -114.4000      12.3       199       141        60
OIR    2025250     91400   18.5700 -114.4100      12.1       201       140        60
OIR    2025250     91400   18.5700 -114.4200      12.0       202       139        60
OIR    2025250     91400   18.5700 -114.4300      11.9       203       139        60
OIR    2025250     91400   18.5700 -114.4700      11.6       205       141        60
OIR    2025250     91400   18.5600 -108.8800      14.6        58       142        60
OIR    2025250     91400   18.5600 -110.5300      15.1        54       138        60
OIR    2025250     91400   18.5600 -110.5400      15.8        54       134        60
OIR    2025250     91400   18.5600 -110.5500      16.7        55       130        60
OIR    2025250     91400   18.5600 -110.5600      17.0        55       128        60
OIR    2025250     91400   18.5600 -110.5700      17.5        55       126        60
OIR    2025250     91400   18.5600 -110.5800      17.6        55       125        60
OIR    2025250     91400   18.5600 -110.5900      17.7        55       125        60
OIR    2025250     91400   18.5600 -110.6000      17.7        55       125        60
OIR    2025250     91400   18.5600 -110.6100      17.8        55       126        60
OIR    2025250     91400   18.5600 -110.6200      17.8        55       127        60
OIR    2025250     91400   18.5600 -110.6300      17.8        55       128        60
OIR    2025250     91400   18.5600 -110.6400      17.8        55       130        60
OIR    2025250     91400   18.5600 -110.6500      17.8        55       130        60
OIR    2025250     91400   18.5600 -110.6600      17.8        55       131        60
OIR    2025250     91400   18.5600 -110.6700      17.8        55       132        60
OIR    2025250     91400   18.5600 -110.6800      17.8        55       132        60
OIR    2025250     91400   18.5600 -110.6900      17.8        55       133        60
OIR    2025250     91400   18.5600 -110.7000      17.9        55       136        60
OIR    2025250     91400   18.5600 -110.7100      18.2        55       139        60
OIR    2025250     91400   18.5600 -111.2100      17.3        80       142        60
OIR    2025250     91400   18.5600 -111.2200      17.4        80       138        60
OIR    2025250     91400   18.5600 -111.2300      17.4        81       135        60
OIR    2025250     91400   18.5600 -111.2400      17.4        81       131        60
OIR    2025250     91400   18.5600 -111.2500      17.4        81       129        60
OIR    2025250     91400   18.5600 -111.2600      17.4        81       127        60
OIR    2025250     91400   18.5600 -111.2700      17.3        81       129        60
OIR    2025250     91400   18.5600 -111.2800      17.3        81       134        60
OIR    2025250     91400   18.5600 -111.2900      17.3        81       136        60
OIR    2025250     91400   18.5600 -111.3000      17.3        81       136        60
OIR    2025250     91400   18.5600 -111.3100      17.3        81       135        60
OIR    2025250     91400   18.5600 -111.3200      17.3        81       134        60
OIR    2025250     91400   18.5600 -111.3300      17.3        81       133        60
OIR    2025250     91400   18.5600 -111.3400      17.2        81       131        60
OIR    2025250     91400   18.5600 -111.3500      17.2        81       130        60
OIR    2025250     91400   18.5600 -111.3600      17.2        80       129        60
OIR    2025250     91400   18.5600 -111.3700      17.1        80       128        60
OIR    2025250     91400   18.5600 -111.3800      17.1        80       128        60
OIR    2025250     91400   18.5600 -111.3900      17.1        80       128        60
OIR    2025250     91400   18.5600 -111.4000      17.0        79       128        60
OIR    2025250     91400   18.5600 -111.4100      16.8        78       129        60
OIR    2025250     91400   18.5600 -111.4200      16.6        78       133        60
OIR    2025250     91400   18.5600 -111.4300      16.4        77       135        60
OIR    2025250     91400   18.5600 -111.4400      16.3        77       135        60
OIR    2025250     91400   18.5600 -111.4500      16.3        77       136        60
OIR    2025250     91400   18.5600 -111.4600      16.2        77       133        60
OIR    2025250     91400   18.5600 -111.4700      16.2        76       131        60
OIR    2025250     91400   18.5600 -111.4800      16.2        76       131        60
OIR    2025250     91400   18.5600 -111.4900      16.1        76       139        60
OIR    2025250     91400   18.5600 -111.5200      15.7        76       141        60
OIR    2025250     91400   18.5600 -111.7800       7.4        69       142        60
OIR    2025250     91400   18.5600 -111.7900       7.6        71       142        60
OIR    2025250     91400   18.5600 -111.8000       7.8        71       143        60
OIR    2025250     91400   18.5600 -111.8100       8.2        70       142        60
OIR    2025250     91400   18.5600 -111.8200       8.6        68       141        60
OIR    2025250     91400   18.5600 -111.8300       9.4        67       140        60
OIR    2025250     91400   18.5600 -111.8400       9.7        65       141        60
OIR    2025250     91400   18.5600 -111.8500       9.6        64       141        60
OIR    2025250     91400   18.5600 -113.2200       7.3       151       138        60
OIR    2025250     91400   18.5600 -113.2300       7.3       150       136        60
OIR    2025250     91400   18.5600 -113.2400       7.3       150       134        60
OIR    2025250     91400   18.5600 -113.2500       7.3       149       132        60
OIR    2025250     91400   18.5600 -113.2600       7.2       148       130        60
OIR    2025250     91400   18.5600 -113.2700       7.2       148       129        60
OIR    2025250     91400   18.5600 -113.2800       7.1       148       130        60
OIR    2025250     91400   18.5600 -113.2900       7.0       149       131        60
OIR    2025250     91400   18.5600 -113.3000       7.0       149       132        60
OIR    2025250     91400   18.5600 -113.3100       7.0       149       134        60
OIR    2025250     91400   18.5600 -113.3200       7.0       150       134        60
OIR    2025250     91400   18.5600 -113.3300       7.0       150       134        60
OIR    2025250     91400   18.5600 -113.3400       7.0       150       133        60
OIR    2025250     91400   18.5600 -113.3500       7.0       150       133        60
OIR    2025250     91400   18.5600 -113.3600       7.0       150       132        60
OIR    2025250     91400   18.5600 -113.3700       7.0       150       129        60
OIR    2025250     91400   18.5600 -113.3800       7.0       150       126        60
OIR    2025250     91400   18.5600 -113.3900       7.1       151       128        60
OIR    2025250     91400   18.5600 -113.4000       7.0       151       132        60
OIR    2025250     91400   18.5600 -113.4100       7.1       153       133        60
OIR    2025250     91400   18.5600 -113.4200       7.2       155       132        60
OIR    2025250     91400   18.5600 -113.4300       7.4       160       132        60
OIR    2025250     91400   18.5600 -113.4400       7.7       165       132        60
OIR    2025250     91400   18.5600 -113.4500       8.0       169       133        60
OIR    2025250     91400   18.5600 -113.4600       8.4       173       132        60
OIR    2025250     91400   18.5600 -113.4700       8.6       175       131        60
OIR    2025250     91400   18.5600 -113.4800       8.6       177       131        60
OIR    2025250     91400   18.5600 -113.4900       8.5       178       130        60
OIR    2025250     91400   18.5600 -113.5000       8.2       180       129        60
OIR    2025250     91400   18.5600 -113.5100       7.9       183       129        60
OIR    2025250     91400   18.5600 -113.5200       7.6       185       129        60
OIR    2025250     91400   18.5600 -113.5300       7.4       185       129        60
OIR    2025250     91400   18.5600 -113.5400       7.3       185       130        60
OIR    2025250     91400   18.5600 -113.5500       7.4       184       128        60
OIR    2025250     91400   18.5600 -113.5600       7.4       184       126        60
OIR    2025250     91400   18.5600 -113.5700       7.5       183       127        60
OIR    2025250     91400   18.5600 -113.5800       7.7       182       129        60
OIR    2025250     91400   18.5600 -113.5900       7.9       182       130        60
OIR    2025250     91400   18.5600 -113.6000       7.9       181       130        60
OIR    2025250     91400   18.5600 -113.6100       7.9       181       130        60
OIR    2025250     91400   18.5600 -113.6200       7.7       181       128        60
OIR    2025250     91400   18.5600 -113.6300       4.2       195       125        60
OIR    2025250     91400   18.5600 -113.6500       7.9       272       116        60
OIR    2025250     91400   18.5600 -113.6600      13.9       280       114        60
OIR    2025250     91400   18.5600 -113.6700      16.0       272       116        60
OIR    2025250     91400   18.5600 -113.6800      17.0       265       117        60
OIR    2025250     91400   18.5600 -113.6900      17.3       258       121        60
OIR    2025250     91400   18.5600 -113.7000      17.2       254       123        60
OIR    2025250     91400   18.5600 -113.7100      17.3       249       127        60
OIR    2025250     91400   18.5600 -113.7200      17.2       243       130        60
OIR    2025250     91400   18.5600 -113.7300      16.3       238       134        60
OIR    2025250     91400   18.5600 -113.7400      14.1       227       137        60
OIR    2025250     91400   18.5600 -113.7500      12.5       216       140        60
OIR    2025250     91400   18.5600 -113.7600      12.1       210       139        60
OIR    2025250     91400   18.5600 -113.7700      12.1       206       139        60
OIR    2025250     91400   18.5600 -113.7800      12.2       205       140        60
OIR    2025250     91400   18.5600 -113.7900      12.2       204       140        60
OIR    2025250     91400   18.5600 -113.8000      12.2       202       141        60
OIR    2025250     91400   18.5600 -113.8100      12.3       199       142        60
OIR    2025250     91400   18.5600 -114.3100      12.5       197       140        60
OIR    2025250     91400   18.5600 -114.3200      12.5       197       137        60
OIR    2025250     91400   18.5600 -114.3300      12.5       197       138        60
OIR    2025250     91400   18.5600 -114.3400      12.5       197       138        60
OIR    2025250     91400   18.5600 -114.3500      12.5       197       139        60
OIR    2025250     91400   18.5600 -114.3600      12.5       198       140        60
OIR    2025250     91400   18.5600 -114.3700      12.4       198       140        60
OIR    2025250     91400   18.5600 -114.3800      12.3       199       140        60
OIR    2025250     91400   18.5600 -114.3900      12.2       200       141        60
OIR    2025250     91400   18.5600 -114.4000      12.1       201       143        60
OIR    2025250     91400   18.5600 -114.4200      11.9       203       142        60
OIR    2025250     91400   18.5600 -114.4300      11.8       204       141        60
OIR    2025250     91400   18.5500 -108.8800      14.6        58       139        60
OIR    2025250     91400   18.5500 -108.8900      14.6        58       139        60
OIR    2025250     91400   18.5500 -108.9000      14.6        58       139        60
OIR    2025250     91400   18.5500 -108.9100      14.7        57       140        60
OIR    2025250     91400   18.5500 -108.9200      14.8        57       141        60
OIR    2025250     91400   18.5500 -108.9300      14.9        57       142        60
OIR    2025250     91400   18.5500 -110.5300      15.8        54       142        60
OIR    2025250     91400   18.5500 -110.5400      16.3        55       138        60
OIR    2025250     91400   18.5500 -110.5500      17.0        55       134        60
OIR    2025250     91400   18.5500 -110.5600      17.3        55       130        60
OIR    2025250     91400   18.5500 -110.5700      17.6        55       127        60
OIR    2025250     91400   18.5500 -110.5800      17.6        55       125        60
OIR    2025250     91400   18.5500 -110.5900      17.7        55       125        60
OIR    2025250     91400   18.5500 -110.6000      17.7        55       126        60
OIR    2025250     91400   18.5500 -110.6100      17.7        55       127        60
OIR    2025250     91400   18.5500 -110.6200      17.7        55       128        60
OIR    2025250     91400   18.5500 -110.6300      17.8        55       129        60
OIR    2025250     91400   18.5500 -110.6400      17.8        55       130        60
OIR    2025250     91400   18.5500 -110.6500      17.8        55       130        60
OIR    2025250     91400   18.5500 -110.6600      17.8        55       131        60
OIR    2025250     91400   18.5500 -110.6700      17.8        55       132        60
OIR    2025250     91400   18.5500 -110.6800      17.8        55       133        60
OIR    2025250     91400   18.5500 -110.6900      17.8        55       134        60
OIR    2025250     91400   18.5500 -110.7000      17.8        55       135        60
OIR    2025250     91400   18.5500 -110.7100      18.0        55       137        60
OIR    2025250     91400   18.5500 -110.7200      18.2        56       140        60
OIR    2025250     91400   18.5500 -111.2100      17.3        80       142        60
OIR    2025250     91400   18.5500 -111.2200      17.4        80       137        60
OIR    2025250     91400   18.5500 -111.2300      17.4        80       133        60
OIR    2025250     91400   18.5500 -111.2400      17.4        81       129        60
OIR    2025250     91400   18.5500 -111.2500      17.4        81       128        60
OIR    2025250     91400   18.5500 -111.2600      17.3        81       126        60
OIR    2025250     91400   18.5500 -111.2700      17.3        81       125        60
OIR    2025250     91400   18.5500 -111.2800      17.3        81       127        60
OIR    2025250     91400   18.5500 -111.2900      17.3        81       129        60
OIR    2025250     91400   18.5500 -111.3000      17.3        81       130        60
OIR    2025250     91400   18.5500 -111.3100      17.3        81       132        60
OIR    2025250     91400   18.5500 -111.3200      17.3        80       130        60
OIR    2025250     91400   18.5500 -111.3300      17.2        80       129        60
OIR    2025250     91400   18.5500 -111.3400      17.2        80       127        60
OIR    2025250     91400   18.5500 -111.3500      17.1        80       126        60
OIR    2025250     91400   18.5500 -111.3600      17.1        80       125        60
OIR    2025250     91400   18.5500 -111.3700      17.0        80       128        60
OIR    2025250     91400   18.5500 -111.3800      16.9        80       131        60
OIR    2025250     91400   18.5500 -111.3900      16.8        79       131        60
OIR    2025250     91400   18.5500 -111.4000      16.7        78       131        60
OIR    2025250     91400   18.5500 -111.4100      16.5        78       131        60
OIR    2025250     91400   18.5500 -111.4200      16.4        77       131        60
OIR    2025250     91400   18.5500 -111.4300      16.3        77       131        60
OIR    2025250     91400   18.5500 -111.4400      16.2        77       131        60
OIR    2025250     91400   18.5500 -111.4500      16.2        77       132        60
OIR    2025250     91400   18.5500 -111.4600      16.2        77       132        60
OIR    2025250     91400   18.5500 -111.4700      16.2        77       132        60
OIR    2025250     91400   18.5500 -111.4800      16.2        76       131        60
OIR    2025250     91400   18.5500 -111.4900      16.1        76       134        60
OIR    2025250     91400   18.5500 -111.5000      16.1        76       138        60
OIR    2025250     91400   18.5500 -111.5100      16.0        76       138        60
OIR    2025250     91400   18.5500 -111.5200      15.8        76       138        60
OIR    2025250     91400   18.5500 -111.5300      15.4        76       141        60
OIR    2025250     91400   18.5500 -111.7200       6.0        82       143        60
OIR    2025250     91400   18.5500 -111.7700       6.5        74       142        60
OIR    2025250     91400   18.5500 -111.7800       6.2        75       140        60
OIR    2025250     91400   18.5500 -111.7900       6.5        76       138        60
OIR    2025250     91400   18.5500 -111.8000       6.9        74       138        60
OIR    2025250     91400   18.5500 -111.8100       7.4        72       139        60
OIR    2025250     91400   18.5500 -111.8200       7.9        69       140        60
OIR    2025250     91400   18.5500 -111.8300       8.9        67       141        60
OIR    2025250     91400   18.5500 -111.8400       9.4        66       141        60
OIR    2025250     91400   18.5500 -111.8500       9.5        65       141        60
OIR    2025250     91400   18.5500 -113.2200       7.2       153       140        60
OIR    2025250     91400   18.5500 -113.2300       7.2       153       137        60
OIR    2025250     91400   18.5500 -113.2400       7.2       152       135        60
OIR    2025250     91400   18.5500 -113.2500       7.2       150       134        60
OIR    2025250     91400   18.5500 -113.2600       7.2       149       132        60
OIR    2025250     91400   18.5500 -113.2700       7.0       149       130        60
OIR    2025250     91400   18.5500 -113.2800       6.8       149       130        60
OIR    2025250     91400   18.5500 -113.2900       6.8       149       130        60
OIR    2025250     91400   18.5500 -113.3000       6.9       150       131        60
OIR    2025250     91400   18.5500 -113.3100       6.9       150       132        60
OIR    2025250     91400   18.5500 -113.3200       6.8       151       132        60
OIR    2025250     91400   18.5500 -113.3300       6.7       151       132        60
OIR    2025250     91400   18.5500 -113.3400       6.7       150       132        60
OIR    2025250     91400   18.5500 -113.3500       6.7       150       130        60
OIR    2025250     91400   18.5500 -113.3600       6.8       149       129        60
OIR    2025250     91400   18.5500 -113.3700       6.8       149       128        60
OIR    2025250     91400   18.5500 -113.3800       6.9       150       127        60
OIR    2025250     91400   18.5500 -113.3900       6.9       150       128        60
OIR    2025250     91400   18.5500 -113.4000       7.0       151       131        60
OIR    2025250     91400   18.5500 -113.4100       7.0       152       132        60
OIR    2025250     91400   18.5500 -113.4200       7.1       154       131        60
OIR    2025250     91400   18.5500 -113.4300       7.3       159       130        60
OIR    2025250     91400   18.5500 -113.4400       7.6       163       131        60
OIR    2025250     91400   18.5500 -113.4500       7.9       168       132        60
OIR    2025250     91400   18.5500 -113.4600       8.3       174       131        60
OIR    2025250     91400   18.5500 -113.4700       8.6       177       130        60
OIR    2025250     91400   18.5500 -113.4800       8.6       180       130        60
OIR    2025250     91400   18.5500 -113.4900       8.4       182       129        60
OIR    2025250     91400   18.5500 -113.5000       8.0       184       129        60
OIR    2025250     91400   18.5500 -113.5100       7.5       187       129        60
OIR    2025250     91400   18.5500 -113.5200       7.2       188       129        60
OIR    2025250     91400   18.5500 -113.5300       7.0       188       129        60
OIR    2025250     91400   18.5500 -113.5400       7.0       187       129        60
OIR    2025250     91400   18.5500 -113.5500       7.1       185       127        60
OIR    2025250     91400   18.5500 -113.5600       7.2       184       124        60
OIR    2025250     91400   18.5500 -113.5700       7.3       183       124        60
OIR    2025250     91400   18.5500 -113.5800       7.5       182       127        60
OIR    2025250     91400   18.5500 -113.5900       7.7       181       129        60
OIR    2025250     91400   18.5500 -113.6000       7.8       181       129        60
OIR    2025250     91400   18.5500 -113.6100       7.8       180       129        60
OIR    2025250     91400   18.5500 -113.6200       7.3       177       128        60
OIR    2025250     91400   18.5500 -113.6300       4.3       173       126        60
OIR    2025250     91400   18.5500 -113.6500       5.1       280       119        60
OIR    2025250     91400   18.5500 -113.6600      11.1       280       116        60
OIR    2025250     91400   18.5500 -113.6700      14.2       272       116        60
OIR    2025250     91400   18.5500 -113.6800      15.7       265       116        60
OIR    2025250     91400   18.5500 -113.6900      15.9       259       119        60
OIR    2025250     91400   18.5500 -113.7000      16.0       256       122        60
OIR    2025250     91400   18.5500 -113.7100      15.9       253       125        60
OIR    2025250     91400   18.5500 -113.7200      15.4       247       127        60
OIR    2025250     91400   18.5500 -113.7300      14.3       239       130        60
OIR    2025250     91400   18.5500 -113.7400      12.7       227       136        60
OIR    2025250     91400   18.5500 -113.7500      11.5       217       141        60
OIR    2025250     91400   18.5500 -113.7600      11.2       210       140        60
OIR    2025250     91400   18.5500 -113.7700      11.2       206       138        60
OIR    2025250     91400   18.5500 -113.7800      11.4       205       138        60
OIR    2025250     91400   18.5500 -113.7900      11.6       204       140        60
OIR    2025250     91400   18.5500 -113.8000      11.7       203       139        60
OIR    2025250     91400   18.5500 -113.8100      12.0       199       137        60
OIR    2025250     91400   18.5500 -113.8200      12.0       196       136        60
OIR    2025250     91400   18.5500 -113.8300      12.0       193       139        60
OIR    2025250     91400   18.5500 -113.8400      11.9       191       141        60
OIR    2025250     91400   18.5500 -114.2100      11.6       184       142        60
OIR    2025250     91400   18.5500 -114.3100      12.6       197       140        60
OIR    2025250     91400   18.5500 -114.3200      12.6       197       137        60
OIR    2025250     91400   18.5500 -114.3300      12.5       197       137        60
OIR    2025250     91400   18.5500 -114.3400      12.5       197       137        60
OIR    2025250     91400   18.5500 -114.3500      12.5       197       138        60
OIR    2025250     91400   18.5500 -114.3600      12.5       198       139        60
OIR    2025250     91400   18.5500 -114.3700      12.4       198       139        60
OIR    2025250     91400   18.5500 -114.3800      12.2       200       140        60
OIR    2025250     91400   18.5500 -114.3900      12.1       201       141        60
OIR    2025250     91400   18.5400 -108.8700      14.6        58       140        60
OIR    2025250     91400   18.5400 -108.8800      14.6        58       137        60
OIR    2025250     91400   18.5400 -108.8900      14.6        58       136        60
OIR    2025250     91400   18.5400 -108.9000      14.7        57       135        60
OIR    2025250     91400   18.5400 -108.9100      14.7        57       134        60
OIR    2025250     91400   18.5400 -108.9200      14.8        57       135        60
OIR    2025250     91400   18.5400 -108.9300      14.9        57       136        60
OIR    2025250     91400   18.5400 -108.9400      15.0        57       137        60
OIR    2025250     91400   18.5400 -108.9500      15.1        57       139        60
OIR    2025250     91400   18.5400 -108.9600      15.1        57       140        60
OIR    2025250     91400   18.5400 -108.9700      15.2        57       141        60
OIR    2025250     91400   18.5400 -108.9800      15.2        57       142        60
OIR    2025250     91400   18.5400 -108.9900      15.2        57       142        60
OIR    2025250     91400   18.5400 -109.0000      15.2        58       142        60
OIR    2025250     91400   18.5400 -110.5400      17.1        55       140        60
OIR    2025250     91400   18.5400 -110.5500      17.2        55       137        60
OIR    2025250     91400   18.5400 -110.5600      17.4        55       133        60
OIR    2025250     91400   18.5400 -110.5700      17.6        55       130        60
OIR    2025250     91400   18.5400 -110.5800      17.6        55       128        60
OIR    2025250     91400   18.5400 -110.5900      17.7        55       127        60
OIR    2025250     91400   18.5400 -110.6000      17.7        55       127        60
OIR    2025250     91400   18.5400 -110.6100      17.7        55       128        60
OIR    2025250     91400   18.5400 -110.6200      17.7        55       128        60
OIR    2025250     91400   18.5400 -110.6300      17.7        55       129        60
OIR    2025250     91400   18.5400 -110.6400      17.7        55       130        60
OIR    2025250     91400   18.5400 -110.6500      17.7        55       131        60
OIR    2025250     91400   18.5400 -110.6600      17.7        55       131        60
OIR    2025250     91400   18.5400 -110.6700      17.7        55       132        60
OIR    2025250     91400   18.5400 -110.6800      17.7        55       133        60
OIR    2025250     91400   18.5400 -110.6900      17.7        55       134        60
OIR    2025250     91400   18.5400 -110.7000      17.7        55       135        60
OIR    2025250     91400   18.5400 -110.7100      17.8        55       136        60
OIR    2025250     91400   18.5400 -110.7200      17.9        56       138        60
OIR    2025250     91400   18.5400 -111.2200      17.4        80       140        60
OIR    2025250     91400   18.5400 -111.2300      17.4        80       135        60
OIR    2025250     91400   18.5400 -111.2400      17.4        80       131        60
OIR    2025250     91400   18.5400 -111.2500      17.4        81       130        60
OIR    2025250     91400   18.5400 -111.2600      17.3        81       130        60
OIR    2025250     91400   18.5400 -111.2700      17.3        81       129        60
OIR    2025250     91400   18.5400 -111.2800      17.3        81       128        60
OIR    2025250     91400   18.5400 -111.2900      17.3        81       127        60
OIR    2025250     91400   18.5400 -111.3000      17.3        80       128        60
OIR    2025250     91400   18.5400 -111.3100      17.3        80       129        60
OIR    2025250     91400   18.5400 -111.3200      17.2        80       129        60
OIR    2025250     91400   18.5400 -111.3300      17.2        80       128        60
OIR    2025250     91400   18.5400 -111.3400      17.1        80       126        60
OIR    2025250     91400   18.5400 -111.3500      17.0        80       126        60
OIR    2025250     91400   18.5400 -111.3600      16.9        79       126        60
OIR    2025250     91400   18.5400 -111.3700      16.8        79       128        60
OIR    2025250     91400   18.5400 -111.3800      16.6        79       132        60
OIR    2025250     91400   18.5400 -111.3900      16.5        78       133        60
OIR    2025250     91400   18.5400 -111.4000      16.4        78       133        60
OIR    2025250     91400   18.5400 -111.4100      16.3        77       134        60
OIR    2025250     91400   18.5400 -111.4200      16.3        77       131        60
OIR    2025250     91400   18.5400 -111.4300      16.2        77       128        60
OIR    2025250     91400   18.5400 -111.4400      16.2        77       127        60
OIR    2025250     91400   18.5400 -111.4500      16.2        77       129        60
OIR    2025250     91400   18.5400 -111.4600      16.2        77       130        60
OIR    2025250     91400   18.5400 -111.4700      16.2        77       132        60
OIR    2025250     91400   18.5400 -111.4800      16.2        77       133        60
OIR    2025250     91400   18.5400 -111.4900      16.2        77       132        60
OIR    2025250     91400   18.5400 -111.5000      16.1        77       131        60
OIR    2025250     91400   18.5400 -111.5100      16.0        77       132        60
OIR    2025250     91400   18.5400 -111.5200      15.8        77       133        60
OIR    2025250     91400   18.5400 -111.5300      15.6        77       137        60
OIR    2025250     91400   18.5400 -111.5400      15.3        78       142        60
OIR    2025250     91400   18.5400 -111.6200       6.7       105       142        60
OIR    2025250     91400   18.5400 -111.6300       6.0        93       143        60
OIR    2025250     91400   18.5400 -111.6400       5.9        85       143        60
OIR    2025250     91400   18.5400 -111.7100       5.3       132       140        60
OIR    2025250     91400   18.5400 -111.7200       5.1       137       139        60
OIR    2025250     91400   18.5400 -111.7300       5.5       124       142        60
OIR    2025250     91400   18.5400 -111.7700       5.2        88       143        60
OIR    2025250     91400   18.5400 -111.7800       5.2        82       139        60
OIR    2025250     91400   18.5400 -111.7900       5.6        81       136        60
OIR    2025250     91400   18.5400 -111.8000       5.9        77       134        60
OIR    2025250     91400   18.5400 -111.8100       6.5        74       134        60
OIR    2025250     91400   18.5400 -111.8200       7.1        70       136        60
OIR    2025250     91400   18.5400 -111.8300       8.3        67       139        60
OIR    2025250     91400   18.5400 -111.8400       9.2        66       140        60
OIR    2025250     91400   18.5400 -111.8500       9.3        65       141        60
OIR    2025250     91400   18.5400 -113.2300       7.1       155       141        60
OIR    2025250     91400   18.5400 -113.2400       6.9       154       138        60
OIR    2025250     91400   18.5400 -113.2500       6.6       153       135        60
OIR    2025250     91400   18.5400 -113.2600       6.6       151       134        60
OIR    2025250     91400   18.5400 -113.2700       6.5       150       133        60
OIR    2025250     91400   18.5400 -113.2800       6.5       150       132        60
OIR    2025250     91400   18.5400 -113.2900       6.5       150       131        60
OIR    2025250     91400   18.5400 -113.3000       6.6       152       131        60
OIR    2025250     91400   18.5400 -113.3100       6.5       153       132        60
OIR    2025250     91400   18.5400 -113.3200       6.3       153       132        60
OIR    2025250     91400   18.5400 -113.3300       6.3       152       132        60
OIR    2025250     91400   18.5400 -113.3400       6.3       151       132        60
OIR    2025250     91400   18.5400 -113.3500       6.4       150       130        60
OIR    2025250     91400   18.5400 -113.3600       6.5       149       128        60
OIR    2025250     91400   18.5400 -113.3700       6.6       149       128        60
OIR    2025250     91400   18.5400 -113.3800       6.7       149       128        60
OIR    2025250     91400   18.5400 -113.3900       6.8       149       129        60
OIR    2025250     91400   18.5400 -113.4000       6.8       151       130        60
OIR    2025250     91400   18.5400 -113.4100       6.9       152       131        60
OIR    2025250     91400   18.5400 -113.4200       7.0       153       130        60
OIR    2025250     91400   18.5400 -113.4300       7.3       157       129        60
OIR    2025250     91400   18.5400 -113.4400       7.7       162       129        60
OIR    2025250     91400   18.5400 -113.4500       8.0       168       130        60
OIR    2025250     91400   18.5400 -113.4600       8.4       175       130        60
OIR    2025250     91400   18.5400 -113.4700       8.5       181       129        60
OIR    2025250     91400   18.5400 -113.4800       8.5       185       128        60
OIR    2025250     91400   18.5400 -113.4900       8.2       188       128        60
OIR    2025250     91400   18.5400 -113.5000       7.6       191       129        60
OIR    2025250     91400   18.5400 -113.5100       7.1       193       129        60
OIR    2025250     91400   18.5400 -113.5200       6.7       193       129        60
OIR    2025250     91400   18.5400 -113.5300       6.4       192       128        60
OIR    2025250     91400   18.5400 -113.5400       6.3       191       127        60
OIR    2025250     91400   18.5400 -113.5500       6.2       189       126        60
OIR    2025250     91400   18.5400 -113.5600       6.5       187       122        60
OIR    2025250     91400   18.5400 -113.5700       6.8       184       119        60
OIR    2025250     91400   18.5400 -113.5800       7.0       181       124        60
OIR    2025250     91400   18.5400 -113.5900       7.4       180       129        60
OIR    2025250     91400   18.5400 -113.6000       7.6       180       129        60
OIR    2025250     91400   18.5400 -113.6100       7.5       179       128        60
OIR    2025250     91400   18.5400 -113.6200       6.7       176       128        60
OIR    2025250     91400   18.5400 -113.6300       4.1       171       128        60
OIR    2025250     91400   18.5400 -113.6600       6.2       287       121        60
OIR    2025250     91400   18.5400 -113.6700       9.7       278       120        60
OIR    2025250     91400   18.5400 -113.6800      11.7       271       119        60
OIR    2025250     91400   18.5400 -113.6900      12.7       266       121        60
OIR    2025250     91400   18.5400 -113.7000      13.3       264       123        60
OIR    2025250     91400   18.5400 -113.7100      13.1       260       126        60
OIR    2025250     91400   18.5400 -113.7200      12.0       250       129        60
OIR    2025250     91400   18.5400 -113.7300      11.4       235       132        60
OIR    2025250     91400   18.5400 -113.7400      10.9       223       136        60
OIR    2025250     91400   18.5400 -113.7500      10.7       214       141        60
OIR    2025250     91400   18.5400 -113.7600      10.5       209       139        60
OIR    2025250     91400   18.5400 -113.7700      10.6       206       138        60
OIR    2025250     91400   18.5400 -113.7800      10.8       204       137        60
OIR    2025250     91400   18.5400 -113.7900      10.9       204       136        60
OIR    2025250     91400   18.5400 -113.8000      11.1       202       136        60
OIR    2025250     91400   18.5400 -113.8100      11.4       200       134        60
OIR    2025250     91400   18.5400 -113.8200      11.5       197       133        60
OIR    2025250     91400   18.5400 -113.8300      11.5       195       136        60
OIR    2025250     91400   18.5400 -113.8400      11.3       192       139        60
OIR    2025250     91400   18.5400 -113.8500      10.9       190       143        60
OIR    2025250     91400   18.5400 -114.1400      11.3       181       142        60
OIR    2025250     91400   18.5400 -114.2000      11.6       183       143        60
OIR    2025250     91400   18.5400 -114.2100      11.6       183       141        60
OIR    2025250     91400   18.5400 -114.2200      11.7       184       142        60
OIR    2025250     91400   18.5400 -114.3100      12.6       197       140        60
OIR    2025250     91400   18.5400 -114.3200      12.6       197       136        60
OIR    2025250     91400   18.5400 -114.3300      12.6       197       136        60
OIR    2025250     91400   18.5400 -114.3400      12.6       197       136        60
OIR    2025250     91400   18.5400 -114.3500      12.5       198       139        60
OIR    2025250     91400   18.5400 -114.3600      12.5       198       141        60
OIR    2025250     91400   18.5400 -114.3700      12.3       199       142        60
OIR    2025250     91400   18.5400 -114.3800      12.2       201       142        60
OIR    2025250     91400   18.5400 -114.3900      12.0       203       142        60
OIR    2025250     91400   18.5400 -114.4000      11.9       203       142        60
OIR    2025250     91400   18.5400 -114.4500      11.6       206       143        60
OIR    2025250     91400   18.5400 -114.4600      11.5       206       143        60
OIR    2025250     91400   18.5300 -108.8600      14.6        58       141        60
OIR    2025250     91400   18.5300 -108.8700      14.6        58       139        60
OIR    2025250     91400   18.5300 -108.8800      14.6        58       136        60
OIR    2025250     91400   18.5300 -108.8900      14.7        58       134        60
OIR    2025250     91400   18.5300 -108.9000      14.7        57       133        60
OIR    2025250     91400   18.5300 -108.9100      14.7        57       132        60
OIR    2025250     91400   18.5300 -108.9200      14.8        57       133        60
OIR    2025250     91400   18.5300 -108.9300      14.8        57       134        60
OIR    2025250     91400   18.5300 -108.9400      14.9        57       135        60
OIR    2025250     91400   18.5300 -108.9500      15.0        57       136        60
OIR    2025250     91400   18.5300 -108.9600      15.0        57       136        60
OIR    2025250     91400   18.5300 -108.9700      15.1        57       137        60
OIR    2025250     91400   18.5300 -108.9800      15.1        57       138        60
OIR    2025250     91400   18.5300 -108.9900      15.1        57       139        60
OIR    2025250     91400   18.5300 -109.0000      15.1        58       139        60
OIR    2025250     91400   18.5300 -109.0100      15.0        58       140        60
OIR    2025250     91400   18.5300 -109.0200      14.9        59       142        60
OIR    2025250     91400   18.5300 -110.5500      17.5        55       139        60
OIR    2025250     91400   18.5300 -110.5600      17.6        55       136        60
OIR    2025250     91400   18.5300 -110.5700      17.6        55       134        60
OIR    2025250     91400   18.5300 -110.5800      17.6        55       131        60
OIR    2025250     91400   18.5300 -110.5900      17.6        55       130        60
OIR    2025250     91400   18.5300 -110.6000      17.6        55       129        60
OIR    2025250     91400   18.5300 -110.6100      17.7        55       129        60
OIR    2025250     91400   18.5300 -110.6200      17.7        55       129        60
OIR    2025250     91400   18.5300 -110.6300      17.7        55       129        60
OIR    2025250     91400   18.5300 -110.6400      17.7        55       130        60
OIR    2025250     91400   18.5300 -110.6500      17.7        55       131        60
OIR    2025250     91400   18.5300 -110.6600      17.7        55       132        60
OIR    2025250     91400   18.5300 -110.6700      17.7        55       132        60
OIR    2025250     91400   18.5300 -110.6800      17.7        55       132        60
OIR    2025250     91400   18.5300 -110.6900      17.7        55       133        60
OIR    2025250     91400   18.5300 -110.7000      17.7        55       133        60
OIR    2025250     91400   18.5300 -110.7100      17.7        55       136        60
OIR    2025250     91400   18.5300 -110.7200      17.7        56       138        60
OIR    2025250     91400   18.5300 -110.7300      17.6        56       142        60
OIR    2025250     91400   18.5300 -111.2200      17.4        80       142        60
OIR    2025250     91400   18.5300 -111.2300      17.4        80       138        60
OIR    2025250     91400   18.5300 -111.2400      17.4        80       133        60
OIR    2025250     91400   18.5300 -111.2500      17.3        80       132        60
OIR    2025250     91400   18.5300 -111.2600      17.3        80       134        60
OIR    2025250     91400   18.5300 -111.2700      17.3        81       135        60
OIR    2025250     91400   18.5300 -111.2800      17.2        81       134        60
OIR    2025250     91400   18.5300 -111.2900      17.2        81       133        60
OIR    2025250     91400   18.5300 -111.3000      17.2        80       131        60
OIR    2025250     91400   18.5300 -111.3100      17.2        80       130        60
OIR    2025250     91400   18.5300 -111.3200      17.2        80       129        60
OIR    2025250     91400   18.5300 -111.3300      17.1        79       129        60
OIR    2025250     91400   18.5300 -111.3400      17.0        79       129        60
OIR    2025250     91400   18.5300 -111.3500      16.9        79       129        60
OIR    2025250     91400   18.5300 -111.3600      16.7        79       129        60
OIR    2025250     91400   18.5300 -111.3700      16.6        78       130        60
OIR    2025250     91400   18.5300 -111.3800      16.5        78       131        60
OIR    2025250     91400   18.5300 -111.3900      16.4        77       132        60
OIR    2025250     91400   18.5300 -111.4000      16.3        77       133        60
OIR    2025250     91400   18.5300 -111.4100      16.2        77       133        60
OIR    2025250     91400   18.5300 -111.4200      16.2        77       130        60
OIR    2025250     91400   18.5300 -111.4300      16.2        77       127        60
OIR    2025250     91400   18.5300 -111.4400      16.2        77       125        60
OIR    2025250     91400   18.5300 -111.4500      16.2        77       126        60
OIR    2025250     91400   18.5300 -111.4600      16.2        77       126        60
OIR    2025250     91400   18.5300 -111.4700      16.2        77       127        60
OIR    2025250     91400   18.5300 -111.4800      16.2        77       128        60
OIR    2025250     91400   18.5300 -111.4900      16.2        77       129        60
OIR    2025250     91400   18.5300 -111.5000      16.2        77       130        60
OIR    2025250     91400   18.5300 -111.5100      16.1        77       132        60
OIR    2025250     91400   18.5300 -111.5200      15.9        79       134        60
OIR    2025250     91400   18.5300 -111.5300      15.7        80       136        60
OIR    2025250     91400   18.5300 -111.5400      15.5        85       138        60
OIR    2025250     91400   18.5300 -111.5500      15.8        96       140        60
OIR    2025250     91400   18.5300 -111.6200       8.9       132       139        60
OIR    2025250     91400   18.5300 -111.6300       8.4       132       139        60
OIR    2025250     91400   18.5300 -111.6400       8.0       129       139        60
OIR    2025250     91400   18.5300 -111.6500       7.6       131       140        60
OIR    2025250     91400   18.5300 -111.6600       6.5       137       142        60
OIR    2025250     91400   18.5300 -111.7000       5.2       153       142        60
OIR    2025250     91400   18.5300 -111.7100       5.5       150       139        60
OIR    2025250     91400   18.5300 -111.7200       5.5       151       137        60
OIR    2025250     91400   18.5300 -111.7300       5.7       147       140        60
OIR    2025250     91400   18.5300 -111.7900       4.5        87       134        60
OIR    2025250     91400   18.5300 -111.8000       5.0        80       131        60
OIR    2025250     91400   18.5300 -111.8100       5.7        75       129        60
OIR    2025250     91400   18.5300 -111.8200       6.3        71       132        60
OIR    2025250     91400   18.5300 -111.8300       7.6        68       136        60
OIR    2025250     91400   18.5300 -111.8400       8.8        66       139        60
OIR    2025250     91400   18.5300 -111.8500       9.1        65       140        60
OIR    2025250     91400   18.5300 -112.9000       4.3       120       143        60
OIR    2025250     91400   18.5300 -113.2400       6.0       159       142        60
OIR    2025250     91400   18.5300 -113.2500       6.0       157       137        60
OIR    2025250     91400   18.5300 -113.2600       6.2       154       137        60
OIR    2025250     91400   18.5300 -113.2700       6.2       152       137        60
OIR    2025250     91400   18.5300 -113.2800       6.2       151       135        60
OIR    2025250     91400   18.5300 -113.2900       6.1       153       132        60
OIR    2025250     91400   18.5300 -113.3000       5.9       155       132        60
OIR    2025250     91400   18.5300 -113.3100       5.8       156       132        60
OIR    2025250     91400   18.5300 -113.3200       5.8       156       133        60
OIR    2025250     91400   18.5300 -113.3300       5.9       154       133        60
OIR    2025250     91400   18.5300 -113.3400       6.1       152       133        60
OIR    2025250     91400   18.5300 -113.3500       6.2       150       132        60
OIR    2025250     91400   18.5300 -113.3600       6.3       149       131        60
OIR    2025250     91400   18.5300 -113.3700       6.4       148       130        60
OIR    2025250     91400   18.5300 -113.3800       6.5       147       131        60
OIR    2025250     91400   18.5300 -113.3900       6.5       148       131        60
OIR    2025250     91400   18.5300 -113.4000       6.6       149       131        60
OIR    2025250     91400   18.5300 -113.4100       6.7       150       131        60
OIR    2025250     91400   18.5300 -113.4200       7.0       152       129        60
OIR    2025250     91400   18.5300 -113.4300       7.3       154       127        60
OIR    2025250     91400   18.5300 -113.4400       7.7       160       125        60
OIR    2025250     91400   18.5300 -113.4500       8.0       168       124        60
OIR    2025250     91400   18.5300 -113.4600       8.0       180       124        60
OIR    2025250     91400   18.5300 -113.4700       8.0       188       122        60
OIR    2025250     91400   18.5300 -113.4800       7.9       192       121        60
OIR    2025250     91400   18.5300 -113.4900       7.7       195       123        60
OIR    2025250     91400   18.5300 -113.5000       7.2       197       124        60
OIR    2025250     91400   18.5300 -113.5100       6.6       198       126        60
OIR    2025250     91400   18.5300 -113.5200       6.2       198       128        60
OIR    2025250     91400   18.5300 -113.5300       5.8       197       128        60
OIR    2025250     91400   18.5300 -113.5400       5.5       195       127        60
OIR    2025250     91400   18.5300 -113.5500       5.4       193       125        60
OIR    2025250     91400   18.5300 -113.5600       5.4       191       122        60
OIR    2025250     91400   18.5300 -113.5700       5.7       188       119        60
OIR    2025250     91400   18.5300 -113.5800       6.1       183       123        60
OIR    2025250     91400   18.5300 -113.5900       6.6       180       129        60
OIR    2025250     91400   18.5300 -113.6000       7.0       179       129        60
OIR    2025250     91400   18.5300 -113.6100       6.7       178       128        60
OIR    2025250     91400   18.5300 -113.6200       5.8       176       128        60
OIR    2025250     91400   18.5300 -113.6300       4.3       174       130        60
OIR    2025250     91400   18.5300 -113.6700       5.0       280       125        60
OIR    2025250     91400   18.5300 -113.6800       8.4       276       124        60
OIR    2025250     91400   18.5300 -113.6900       9.9       273       124        60
OIR    2025250     91400   18.5300 -113.7000      10.6       270       126        60
OIR    2025250     91400   18.5300 -113.7100      10.2       262       128        60
OIR    2025250     91400   18.5300 -113.7200       9.2       247       131        60
OIR    2025250     91400   18.5300 -113.7300       9.4       228       134        60
OIR    2025250     91400   18.5300 -113.7400       9.6       216       137        60
OIR    2025250     91400   18.5300 -113.7500       9.7       210       141        60
OIR    2025250     91400   18.5300 -113.7600       9.8       207       140        60
OIR    2025250     91400   18.5300 -113.7700      10.1       205       138        60
OIR    2025250     91400   18.5300 -113.7800      10.3       204       137        60
OIR    2025250     91400   18.5300 -113.7900      10.4       203       135        60
OIR    2025250     91400   18.5300 -113.8000      10.6       202       132        60
OIR    2025250     91400   18.5300 -113.8100      10.7       201       132        60
OIR    2025250     91400   18.5300 -113.8200      10.6       198       131        60
OIR    2025250     91400   18.5300 -113.8300      10.3       197       133        60
OIR    2025250     91400   18.5300 -113.8400       9.8       196       137        60
OIR    2025250     91400   18.5300 -113.8500       9.2       196       141        60
OIR    2025250     91400   18.5300 -113.9800      10.5       185       139        60
OIR    2025250     91400   18.5300 -113.9900      10.5       185       140        60
OIR    2025250     91400   18.5300 -114.0000      10.6       185       141        60
OIR    2025250     91400   18.5300 -114.1400      11.5       181       139        60
OIR    2025250     91400   18.5300 -114.1500      11.6       181       141        60
OIR    2025250     91400   18.5300 -114.3100      12.7       197       142        60
OIR    2025250     91400   18.5300 -114.3200      12.7       197       140        60
OIR    2025250     91400   18.5300 -114.3300      12.7       197       139        60
OIR    2025250     91400   18.5300 -114.3400      12.6       198       139        60
OIR    2025250     91400   18.5300 -114.3500      12.6       198       140        60
OIR    2025250     91400   18.5300 -114.4000      11.9       205       143        60
OIR    2025250     91400   18.5300 -114.4100      11.8       205       142        60
OIR    2025250     91400   18.5300 -114.4200      11.7       206       142        60
OIR    2025250     91400   18.5300 -114.4500      11.6       206       141        60
OIR    2025250     91400   18.5300 -114.4600      11.5       206       139        60
OIR    2025250     91400   18.5300 -114.4700      11.5       207       142        60
OIR    2025250     91400   18.5200 -108.8600      14.6        58       139        60
OIR    2025250     91400   18.5200 -108.8700      14.6        58       136        60
OIR    2025250     91400   18.5200 -108.8800      14.6        58       135        60
OIR    2025250     91400   18.5200 -108.8900      14.6        58       133        60
OIR    2025250     91400   18.5200 -108.9000      14.7        57       131        60
OIR    2025250     91400   18.5200 -108.9100      14.7        57       130        60
OIR    2025250     91400   18.5200 -108.9200      14.8        57       130        60
OIR    2025250     91400   18.5200 -108.9300      14.8        57       131        60
OIR    2025250     91400   18.5200 -108.9400      14.9        57       132        60
OIR    2025250     91400   18.5200 -108.9500      14.9        57       132        60
OIR    2025250     91400   18.5200 -108.9600      15.0        57       132        60
OIR    2025250     91400   18.5200 -108.9700      15.0        57       133        60
OIR    2025250     91400   18.5200 -108.9800      15.0        57       134        60
OIR    2025250     91400   18.5200 -108.9900      15.0        58       135        60
OIR    2025250     91400   18.5200 -109.0000      15.0        58       136        60
OIR    2025250     91400   18.5200 -109.0100      15.0        58       136        60
OIR    2025250     91400   18.5200 -109.0200      14.9        58       137        60
OIR    2025250     91400   18.5200 -109.0300      14.7        59       138        60
OIR    2025250     91400   18.5200 -109.0400      14.6        60       139        60
OIR    2025250     91400   18.5200 -109.0500      14.8        59       140        60
OIR    2025250     91400   18.5200 -109.0600      14.8        58       141        60
OIR    2025250     91400   18.5200 -110.5600      17.6        55       140        60
OIR    2025250     91400   18.5200 -110.5700      17.6        55       138        60
OIR    2025250     91400   18.5200 -110.5800      17.6        55       135        60
OIR    2025250     91400   18.5200 -110.5900      17.6        55       133        60
OIR    2025250     91400   18.5200 -110.6000      17.6        55       132        60
OIR    2025250     91400   18.5200 -110.6100      17.6        55       131        60
OIR    2025250     91400   18.5200 -110.6200      17.6        55       131        60
OIR    2025250     91400   18.5200 -110.6300      17.6        55       131        60
OIR    2025250     91400   18.5200 -110.6400      17.6        55       132        60
OIR    2025250     91400   18.5200 -110.6500      17.6        55       133        60
OIR    2025250     91400   18.5200 -110.6600      17.6        55       133        60
OIR    2025250     91400   18.5200 -110.6700      17.6        55       133        60
OIR    2025250     91400   18.5200 -110.6800      17.6        55       133        60
OIR    2025250     91400   18.5200 -110.6900      17.6        55       133        60
OIR    2025250     91400   18.5200 -110.7000      17.6        55       133        60
OIR    2025250     91400   18.5200 -110.7100      17.6        56       136        60
OIR    2025250     91400   18.5200 -110.7200      17.6        56       139        60
OIR    2025250     91400   18.5200 -110.7300      17.5        56       142        60
OIR    2025250     91400   18.5200 -111.2300      17.4        80       140        60
OIR    2025250     91400   18.5200 -111.2400      17.3        80       136        60
OIR    2025250     91400   18.5200 -111.2500      17.3        80       134        60
OIR    2025250     91400   18.5200 -111.2600      17.3        80       136        60
OIR    2025250     91400   18.5200 -111.2700      17.2        80       138        60
OIR    2025250     91400   18.5200 -111.2800      17.2        80       137        60
OIR    2025250     91400   18.5200 -111.2900      17.2        80       137        60
OIR    2025250     91400   18.5200 -111.3000      17.1        80       135        60
OIR    2025250     91400   18.5200 -111.3100      17.1        80       131        60
OIR    2025250     91400   18.5200 -111.3200      16.9        79       128        60
OIR    2025250     91400   18.5200 -111.3300      16.9        79       129        60
OIR    2025250     91400   18.5200 -111.3400      16.8        78       130        60
OIR    2025250     91400   18.5200 -111.3500      16.7        78       131        60
OIR    2025250     91400   18.5200 -111.3600      16.6        78       131        60
OIR    2025250     91400   18.5200 -111.3700      16.4        78       132        60
OIR    2025250     91400   18.5200 -111.3800      16.3        77       132        60
OIR    2025250     91400   18.5200 -111.3900      16.3        77       132        60
OIR    2025250     91400   18.5200 -111.4000      16.2        77       132        60
OIR    2025250     91400   18.5200 -111.4100      16.2        77       132        60
OIR    2025250     91400   18.5200 -111.4200      16.2        77       129        60
OIR    2025250     91400   18.5200 -111.4300      16.2        77       126        60
OIR    2025250     91400   18.5200 -111.4400      16.2        77       124        60
OIR    2025250     91400   18.5200 -111.4500      16.2        77       123        60
OIR    2025250     91400   18.5200 -111.4600      16.2        77       123        60
OIR    2025250     91400   18.5200 -111.4700      16.2        77       123        60
OIR    2025250     91400   18.5200 -111.4800      16.2        77       123        60
OIR    2025250     91400   18.5200 -111.4900      16.2        77       125        60
OIR    2025250     91400   18.5200 -111.5000      16.2        77       129        60
OIR    2025250     91400   18.5200 -111.5100      16.2        79       132        60
OIR    2025250     91400   18.5200 -111.5200      16.2        82       135        60
OIR    2025250     91400   18.5200 -111.5300      16.2        89       137        60
OIR    2025250     91400   18.5200 -111.5400      17.5       103       135        60
OIR    2025250     91400   18.5200 -111.5500      20.1       116       133        60
OIR    2025250     91400   18.5200 -111.5600      20.7       120       138        60
OIR    2025250     91400   18.5200 -111.6100      11.4       131       140        60
OIR    2025250     91400   18.5200 -111.6200       9.4       131       135        60
OIR    2025250     91400   18.5200 -111.6300       8.6       131       135        60
OIR    2025250     91400   18.5200 -111.6400       8.2       129       136        60
OIR    2025250     91400   18.5200 -111.6500       7.8       126       136        60
OIR    2025250     91400   18.5200 -111.6600       7.1       126       140        60
OIR    2025250     91400   18.5200 -111.6900       5.1       159       142        60
OIR    2025250     91400   18.5200 -111.7000       5.3       157       140        60
OIR    2025250     91400   18.5200 -111.7100       5.4       155       139        60
OIR    2025250     91400   18.5200 -111.7200       5.5       155       139        60
OIR    2025250     91400   18.5200 -111.7300       5.7       154       142        60
OIR    2025250     91400   18.5200 -111.8100       4.7        79       131        60
OIR    2025250     91400   18.5200 -111.8200       5.6        74       133        60
OIR    2025250     91400   18.5200 -111.8300       7.0        70       137        60
OIR    2025250     91400   18.5200 -111.8400       8.3        67       140        60
OIR    2025250     91400   18.5200 -111.8500       8.8        65       142        60
OIR    2025250     91400   18.5200 -112.8900       6.1       130       142        60
OIR    2025250     91400   18.5200 -112.9000       5.3       122       136        60
OIR    2025250     91400   18.5200 -112.9100       4.2       107       136        60
OIR    2025250     91400   18.5200 -113.2500       5.5       160       141        60
OIR    2025250     91400   18.5200 -113.2600       5.4       159       140        60
OIR    2025250     91400   18.5200 -113.2700       5.4       157       140        60
OIR    2025250     91400   18.5200 -113.2800       5.5       156       138        60
OIR    2025250     91400   18.5200 -113.2900       5.4       157       135        60
OIR    2025250     91400   18.5200 -113.3000       5.4       158       134        60
OIR    2025250     91400   18.5200 -113.3100       5.3       158       135        60
OIR    2025250     91400   18.5200 -113.3200       5.4       157       136        60
OIR    2025250     91400   18.5200 -113.3300       5.6       155       135        60
OIR    2025250     91400   18.5200 -113.3400       5.8       152       134        60
OIR    2025250     91400   18.5200 -113.3500       6.0       150       133        60
OIR    2025250     91400   18.5200 -113.3600       6.1       149       132        60
OIR    2025250     91400   18.5200 -113.3700       6.3       148       132        60
OIR    2025250     91400   18.5200 -113.3800       6.3       146       132        60
OIR    2025250     91400   18.5200 -113.3900       6.4       146       133        60
OIR    2025250     91400   18.5200 -113.4000       6.4       147       131        60
OIR    2025250     91400   18.5200 -113.4100       6.5       148       130        60
OIR    2025250     91400   18.5200 -113.4200       6.8       148       127        60
OIR    2025250     91400   18.5200 -113.4300       7.0       150       125        60
OIR    2025250     91400   18.5200 -113.4400       7.3       155       122        60
OIR    2025250     91400   18.5200 -113.4500       6.9       169       120        60
OIR    2025250     91400   18.5200 -113.4600       6.4       190       116        60
OIR    2025250     91400   18.5200 -113.4700       6.8       197       116        60
OIR    2025250     91400   18.5200 -113.4800       7.1       198       115        60
OIR    2025250     91400   18.5200 -113.4900       7.1       200       116        60
OIR    2025250     91400   18.5200 -113.5000       6.7       202       120        60
OIR    2025250     91400   18.5200 -113.5100       6.2       202       123        60
OIR    2025250     91400   18.5200 -113.5200       5.8       201       127        60
OIR    2025250     91400   18.5200 -113.5300       5.4       199       128        60
OIR    2025250     91400   18.5200 -113.5400       5.1       198       126        60
OIR    2025250     91400   18.5200 -113.5500       4.9       196       124        60
OIR    2025250     91400   18.5200 -113.5600       4.8       195       123        60
OIR    2025250     91400   18.5200 -113.5700       4.6       193       121        60
OIR    2025250     91400   18.5200 -113.5800       4.7       190       124        60
OIR    2025250     91400   18.5200 -113.5900       5.0       185       129        60
OIR    2025250     91400   18.5200 -113.6000       5.5       182       131        60
OIR    2025250     91400   18.5200 -113.6100       5.5       180       129        60
OIR    2025250     91400   18.5200 -113.6200       4.8       177       128        60
OIR    2025250     91400   18.5200 -113.6300       4.1       175       132        60
OIR    2025250     91400   18.5200 -113.6800       4.9       249       131        60
OIR    2025250     91400   18.5200 -113.6900       7.0       262       130        60
OIR    2025250     91400   18.5200 -113.7000       7.3       260       130        60
OIR    2025250     91400   18.5200 -113.7100       7.4       244       131        60
OIR    2025250     91400   18.5200 -113.7200       7.7       230       134        60
OIR    2025250     91400   18.5200 -113.7300       8.2       218       137        60
OIR    2025250     91400   18.5200 -113.7400       8.7       212       140        60
OIR    2025250     91400   18.5200 -113.7700       9.5       204       141        60
OIR    2025250     91400   18.5200 -113.7800       9.7       203       139        60
OIR    2025250     91400   18.5200 -113.7900       9.8       202       136        60
OIR    2025250     91400   18.5200 -113.8000       9.9       202       132        60
OIR    2025250     91400   18.5200 -113.8100       9.9       200       131        60
OIR    2025250     91400   18.5200 -113.8200       9.6       199       131        60
OIR    2025250     91400   18.5200 -113.8300       9.4       198       131        60
OIR    2025250     91400   18.5200 -113.8400       8.9       197       131        60
OIR    2025250     91400   18.5200 -113.8500       8.3       198       134        60
OIR    2025250     91400   18.5200 -113.8600       8.2       197       141        60
OIR    2025250     91400   18.5200 -113.9800      10.2       184       139        60
OIR    2025250     91400   18.5200 -113.9900      10.0       182       137        60
OIR    2025250     91400   18.5200 -114.0000       9.8       182       137        60
OIR    2025250     91400   18.5200 -114.0100       9.4       180       141        60
OIR    2025250     91400   18.5200 -114.1300      11.5       181       142        60
OIR    2025250     91400   18.5200 -114.1400      11.5       181       136        60
OIR    2025250     91400   18.5200 -114.1500      11.6       181       139        60
OIR    2025250     91400   18.5200 -114.1600      11.7       182       142        60
OIR    2025250     91400   18.5200 -114.4200      11.7       206       142        60
OIR    2025250     91400   18.5200 -114.4300      11.7       206       140        60
OIR    2025250     91400   18.5200 -114.4400      11.6       206       139        60
OIR    2025250     91400   18.5200 -114.4500      11.6       207       139        60
OIR    2025250     91400   18.5200 -114.4600      11.5       207       138        60
OIR    2025250     91400   18.5200 -114.4700      11.5       207       141        60
OIR    2025250     91400   18.5100 -108.8300      14.3        59       142        60
OIR    2025250     91400   18.5100 -108.8400      14.4        59       140        60
OIR    2025250     91400   18.5100 -108.8500      14.5        58       137        60
OIR    2025250     91400   18.5100 -108.8600      14.6        58       134        60
OIR    2025250     91400   18.5100 -108.8700      14.6        58       133        60
OIR    2025250     91400   18.5100 -108.8800      14.6        58       132        60
OIR    2025250     91400   18.5100 -108.8900      14.6        58       132        60
OIR    2025250     91400   18.5100 -108.9000      14.7        58       130        60
OIR    2025250     91400   18.5100 -108.9100      14.7        57       128        60
OIR    2025250     91400   18.5100 -108.9200      14.8        57       127        60
OIR    2025250     91400   18.5100 -108.9300      14.8        57       128        60
OIR    2025250     91400   18.5100 -108.9400      14.8        57       128        60
OIR    2025250     91400   18.5100 -108.9500      14.9        57       128        60
OIR    2025250     91400   18.5100 -108.9600      14.9        57       128        60
OIR    2025250     91400   18.5100 -108.9700      14.9        57       129        60
OIR    2025250     91400   18.5100 -108.9800      14.9        58       130        60
OIR    2025250     91400   18.5100 -108.9900      14.9        58       131        60
OIR    2025250     91400   18.5100 -109.0000      14.9        58       132        60
OIR    2025250     91400   18.5100 -109.0100      14.9        58       133        60
OIR    2025250     91400   18.5100 -109.0200      14.9        58       134        60
OIR    2025250     91400   18.5100 -109.0300      14.9        58       135        60
OIR    2025250     91400   18.5100 -109.0400      14.8        58       136        60
OIR    2025250     91400   18.5100 -109.0500      14.8        58       136        60
OIR    2025250     91400   18.5100 -109.0600      14.8        58       137        60
OIR    2025250     91400   18.5100 -109.0700      14.8        58       140        60
OIR    2025250     91400   18.5100 -110.5800      17.6        55       140        60
OIR    2025250     91400   18.5100 -110.5900      17.6        55       138        60
OIR    2025250     91400   18.5100 -110.6000      17.5        55       135        60
OIR    2025250     91400   18.5100 -110.6100      17.5        55       134        60
OIR    2025250     91400   18.5100 -110.6200      17.5        55       134        60
OIR    2025250     91400   18.5100 -110.6300      17.5        55       134        60
OIR    2025250     91400   18.5100 -110.6400      17.5        55       134        60
OIR    2025250     91400   18.5100 -110.6500      17.5        55       135        60
OIR    2025250     91400   18.5100 -110.6600      17.5        55       135        60
OIR    2025250     91400   18.5100 -110.6700      17.5        55       135        60
OIR    2025250     91400   18.5100 -110.6800      17.5        55       134        60
OIR    2025250     91400   18.5100 -110.6900      17.5        55       135        60
OIR    2025250     91400   18.5100 -110.7000      17.5        56       136        60
OIR    2025250     91400   18.5100 -110.7100      17.5        56       138        60
OIR    2025250     91400   18.5100 -110.7200      17.5        56       141        60
OIR    2025250     91400   18.5100 -111.2300      17.2        80       141        60
OIR    2025250     91400   18.5100 -111.2400      17.2        80       139        60
OIR    2025250     91400   18.5100 -111.2500      17.2        80       137        60
OIR    2025250     91400   18.5100 -111.2600      17.2        80       138        60
OIR    2025250     91400   18.5100 -111.2700      17.1        80       140        60
OIR    2025250     91400   18.5100 -111.2800      17.0        80       140        60
OIR    2025250     91400   18.5100 -111.2900      16.9        80       140        60
OIR    2025250     91400   18.5100 -111.3000      16.6        79       139        60
OIR    2025250     91400   18.5100 -111.3100      16.6        79       133        60
OIR    2025250     91400   18.5100 -111.3200      16.4        78       128        60
OIR    2025250     91400   18.5100 -111.3300      16.6        78       129        60
OIR    2025250     91400   18.5100 -111.3400      16.5        77       130        60
OIR    2025250     91400   18.5100 -111.3500      16.5        77       131        60
OIR    2025250     91400   18.5100 -111.3600      16.4        77       132        60
OIR    2025250     91400   18.5100 -111.3700      16.3        77       133        60
OIR    2025250     91400   18.5100 -111.3800      16.2        77       132        60
OIR    2025250     91400   18.5100 -111.3900      16.2        77       132        60
OIR    2025250     91400   18.5100 -111.4000      16.2        77       131        60
OIR    2025250     91400   18.5100 -111.4100      16.2        77       131        60
OIR    2025250     91400   18.5100 -111.4200      16.2        77       130        60
OIR    2025250     91400   18.5100 -111.4300      16.2        77       129        60
OIR    2025250     91400   18.5100 -111.4400      16.2        77       127        60
OIR    2025250     91400   18.5100 -111.4500      16.2        77       127        60
OIR    2025250     91400   18.5100 -111.4600      16.2        77       126        60
OIR    2025250     91400   18.5100 -111.4700      16.2        77       125        60
OIR    2025250     91400   18.5100 -111.4800      16.2        77       124        60
OIR    2025250     91400   18.5100 -111.4900      16.2        77       126        60
OIR    2025250     91400   18.5100 -111.5000      16.3        78       129        60
OIR    2025250     91400   18.5100 -111.5100      16.6        81       133        60
OIR    2025250     91400   18.5100 -111.5200      17.3        89       134        60
OIR    2025250     91400   18.5100 -111.5300      18.9       103       136        60
OIR    2025250     91400   18.5100 -111.5400      21.1       116       136        60
OIR    2025250     91400   18.5100 -111.5500      21.9       121       135        60
OIR    2025250     91400   18.5100 -111.5600      21.5       121       136        60
OIR    2025250     91400   18.5100 -111.5700      20.3       122       140        60
OIR    2025250     91400   18.5100 -111.5900      14.6       125       139        60
OIR    2025250     91400   18.5100 -111.6000      13.9       127       134        60
OIR    2025250     91400   18.5100 -111.6100      12.5       124       130        60
OIR    2025250     91400   18.5100 -111.6200      11.4       121       127        60
OIR    2025250     91400   18.5100 -111.6300       9.6       124       125        60
OIR    2025250     91400   18.5100 -111.6400       9.4       124       126        60
OIR    2025250     91400   18.5100 -111.6500       9.1       122       127        60
OIR    2025250     91400   18.5100 -111.6600       6.9       119       134        60
OIR    2025250     91400   18.5100 -111.6700       4.7       131       142        60
OIR    2025250     91400   18.5100 -111.6900       5.3       161       142        60
OIR    2025250     91400   18.5100 -111.7000       5.4       160       139        60
OIR    2025250     91400   18.5100 -111.7100       5.4       159       140        60
OIR    2025250     91400   18.5100 -111.7200       5.5       158       140        60
OIR    2025250     91400   18.5100 -111.8200       5.1        78       134        60
OIR    2025250     91400   18.5100 -111.8300       6.3        73       138        60
OIR    2025250     91400   18.5100 -111.8400       7.6        68       141        60
OIR    2025250     91400   18.5100 -111.8500       8.4        65       143        60
OIR    2025250     91400   18.5100 -112.8900       6.0       128       140        60
OIR    2025250     91400   18.5100 -112.9000       5.0       118       136        60
OIR    2025250     91400   18.5100 -112.9100       4.5       111       133        60
OIR    2025250     91400   18.5100 -112.9200       4.0       101       136        60
OIR    2025250     91400   18.5100 -112.9400       4.0       114       142        60
OIR    2025250     91400   18.5100 -113.2700       5.2       160       143        60
OIR    2025250     91400   18.5100 -113.2800       5.2       159       141        60
OIR    2025250     91400   18.5100 -113.2900       5.2       159       139        60
OIR    2025250     91400   18.5100 -113.3000       5.2       159       137        60
OIR    2025250     91400   18.5100 -113.3100       5.2       159       139        60
OIR    2025250     91400   18.5100 -113.3200       5.2       158       141        60
OIR    2025250     91400   18.5100 -113.3300       5.3       156       138        60
OIR    2025250     91400   18.5100 -113.3400       5.5       153       135        60
OIR    2025250     91400   18.5100 -113.3500       5.7       150       132        60
OIR    2025250     91400   18.5100 -113.3600       5.9       148       132        60
OIR    2025250     91400   18.5100 -113.3700       6.0       146       132        60
OIR    2025250     91400   18.5100 -113.3800       6.1       144       132        60
OIR    2025250     91400   18.5100 -113.3900       6.1       142       132        60
OIR    2025250     91400   18.5100 -113.4000       6.0       141       131        60
OIR    2025250     91400   18.5100 -113.4100       6.0       139       129        60
OIR    2025250     91400   18.5100 -113.4200       5.9       136       125        60
OIR    2025250     91400   18.5100 -113.4300       5.7       133       121        60
OIR    2025250     91400   18.5100 -113.4400       4.3       131       116        60
OIR    2025250     91400   18.5100 -113.4700       4.9       200       113        60
OIR    2025250     91400   18.5100 -113.4800       6.1       202       114        60
OIR    2025250     91400   18.5100 -113.4900       6.3       205       116        60
OIR    2025250     91400   18.5100 -113.5000       6.1       206       121        60
OIR    2025250     91400   18.5100 -113.5100       5.7       204       124        60
OIR    2025250     91400   18.5100 -113.5200       5.3       203       126        60
OIR    2025250     91400   18.5100 -113.5300       5.0       201       128        60
OIR    2025250     91400   18.5100 -113.5400       4.8       199       127        60
OIR    2025250     91400   18.5100 -113.5500       4.6       198       125        60
OIR    2025250     91400   18.5100 -113.5600       4.4       197       125        60
OIR    2025250     91400   18.5100 -113.5700       4.3       195       126        60
OIR    2025250     91400   18.5100 -113.5800       4.3       192       127        60
OIR    2025250     91400   18.5100 -113.5900       4.4       189       130        60
OIR    2025250     91400   18.5100 -113.6000       4.7       185       133        60
OIR    2025250     91400   18.5100 -113.6100       4.6       182       131        60
OIR    2025250     91400   18.5100 -113.6200       4.3       177       129        60
OIR    2025250     91400   18.5100 -113.6800       4.8       208       134        60
OIR    2025250     91400   18.5100 -113.6900       6.2       208       134        60
OIR    2025250     91400   18.5100 -113.7000       6.8       207       134        60
OIR    2025250     91400   18.5100 -113.7100       7.1       213       134        60
OIR    2025250     91400   18.5100 -113.7200       7.7       214       136        60
OIR    2025250     91400   18.5100 -113.7300       8.0       212       140        60
OIR    2025250     91400   18.5100 -113.7400       8.3       208       143        60
OIR    2025250     91400   18.5100 -113.7800       9.1       202       141        60
OIR    2025250     91400   18.5100 -113.7900       9.2       202       137        60
OIR    2025250     91400   18.5100 -113.8000       9.3       201       133        60
OIR    2025250     91400   18.5100 -113.8100       9.2       200       131        60
OIR    2025250     91400   18.5100 -113.8200       9.1       199       131        60
OIR    2025250     91400   18.5100 -113.8300       8.9       198       131        60
OIR    2025250     91400   18.5100 -113.8400       8.6       198       127        60
OIR    2025250     91400   18.5100 -113.8500       8.2       197       125        60
OIR    2025250     91400   18.5100 -113.8600       8.1       198       134        60
OIR    2025250     91400   18.5100 -113.9800       9.5       178       141        60
OIR    2025250     91400   18.5100 -113.9900       9.3       178       136        60
OIR    2025250     91400   18.5100 -114.0000       9.1       178       137        60
OIR    2025250     91400   18.5100 -114.0100       9.1       178       139        60
OIR    2025250     91400   18.5100 -114.1400      11.5       181       138        60
OIR    2025250     91400   18.5100 -114.1500      11.6       181       138        60
OIR    2025250     91400   18.5100 -114.1600      11.7       181       142        60
OIR    2025250     91400   18.5100 -114.2800      12.8       196       142        60
OIR    2025250     91400   18.5100 -114.4200      11.7       206       141        60
OIR    2025250     91400   18.5100 -114.4300      11.6       207       138        60
OIR    2025250     91400   18.5100 -114.4400      11.6       207       136        60
OIR    2025250     91400   18.5100 -114.4500      11.5       207       137        60
OIR    2025250     91400   18.5100 -114.4600      11.5       207       138        60
OIR    2025250     91400   18.5100 -114.4700      11.5       207       140        60
OIR    2025250     91400   18.5100 -114.4800      11.4       207       142        60
OIR    2025250     91400   18.5000 -108.7900      14.2        59       142        60
OIR    2025250     91400   18.5000 -108.8000      14.3        59       141        60
OIR    2025250     91400   18.5000 -108.8100      14.3        59       141        60
OIR    2025250     91400   18.5000 -108.8200      14.3        59       140        60
OIR    2025250     91400   18.5000 -108.8300      14.3        59       137        60
OIR    2025250     91400   18.5000 -108.8400      14.4        59       134        60
OIR    2025250     91400   18.5000 -108.8500      14.5        58       132        60
OIR    2025250     91400   18.5000 -108.8600      14.6        58       131        60
OIR    2025250     91400   18.5000 -108.8700      14.6        58       129        60
OIR    2025250     91400   18.5000 -108.8800      14.6        58       130        60
OIR    2025250     91400   18.5000 -108.8900      14.6        58       130        60
OIR    2025250     91400   18.5000 -108.9000      14.7        58       129        60
OIR    2025250     91400   18.5000 -108.9100      14.7        57       126        60
OIR    2025250     91400   18.5000 -108.9200      14.7        57       125        60
OIR    2025250     91400   18.5000 -108.9300      14.8        57       124        60
OIR    2025250     91400   18.5000 -108.9400      14.8        57       124        60
OIR    2025250     91400   18.5000 -108.9500      14.8        57       123        60
OIR    2025250     91400   18.5000 -108.9600      14.9        57       124        60
OIR    2025250     91400   18.5000 -108.9700      14.9        58       124        60
OIR    2025250     91400   18.5000 -108.9800      14.9        58       126        60
OIR    2025250     91400   18.5000 -108.9900      14.9        58       127        60
OIR    2025250     91400   18.5000 -109.0000      14.9        58       129        60
OIR    2025250     91400   18.5000 -109.0100      14.9        58       130        60
OIR    2025250     91400   18.5000 -109.0200      14.9        58       131        60
OIR    2025250     91400   18.5000 -109.0300      14.9        58       133        60
OIR    2025250     91400   18.5000 -109.0400      14.9        58       133        60
OIR    2025250     91400   18.5000 -109.0500      14.9        58       134        60
OIR    2025250     91400   18.5000 -109.0600      14.9        58       134        60
OIR    2025250     91400   18.5000 -109.0700      14.9        58       134        60
OIR    2025250     91400   18.5000 -109.0800      14.9        58       135        60
OIR    2025250     91400   18.5000 -109.0900      14.8        58       137        60
OIR    2025250     91400   18.5000 -109.1000      14.9        58       139        60
OIR    2025250     91400   18.5000 -109.1100      14.9        58       141        60
OIR    2025250     91400   18.5000 -110.5900      17.5        55       140        60
OIR    2025250     91400   18.5000 -110.6000      17.5        55       138        60
OIR    2025250     91400   18.5000 -110.6100      17.5        55       136        60
OIR    2025250     91400   18.5000 -110.6200      17.5        55       137        60
OIR    2025250     91400   18.5000 -110.6300      17.5        55       138        60
OIR    2025250     91400   18.5000 -110.6400      17.5        55       138        60
OIR    2025250     91400   18.5000 -110.6500      17.5        55       138        60
OIR    2025250     91400   18.5000 -110.6600      17.5        55       138        60
OIR    2025250     91400   18.5000 -110.6700      17.5        55       136        60
OIR    2025250     91400   18.5000 -110.6800      17.5        55       135        60
OIR    2025250     91400   18.5000 -110.6900      17.5        56       137        60
OIR    2025250     91400   18.5000 -110.7000      17.5        56       139        60
OIR    2025250     91400   18.5000 -110.7100      17.5        56       141        60
OIR    2025250     91400   18.5000 -111.2300      16.5        77       142        60
OIR    2025250     91400   18.5000 -111.2400      16.9        79       141        60
OIR    2025250     91400   18.5000 -111.2500      17.0        79       139        60
OIR    2025250     91400   18.5000 -111.2600      16.9        79       140        60
OIR    2025250     91400   18.5000 -111.2700      16.9        80       141        60
OIR    2025250     91400   18.5000 -111.2800      16.6        79       142        60
OIR    2025250     91400   18.5000 -111.2900      16.5        79       141        60
OIR    2025250     91400   18.5000 -111.3000      16.1        78       140        60
OIR    2025250     91400   18.5000 -111.3100      15.9        78       136        60
OIR    2025250     91400   18.5000 -111.3200      16.0        77       131        60
OIR    2025250     91400   18.5000 -111.3300      16.3        77       129        60
OIR    2025250     91400   18.5000 -111.3400      16.3        77       129        60
OIR    2025250     91400   18.5000 -111.3500      16.3        77       130        60
OIR    2025250     91400   18.5000 -111.3600      16.3        77       131        60
OIR    2025250     91400   18.5000 -111.3700      16.2        77       132        60
OIR    2025250     91400   18.5000 -111.3800      16.2        77       132        60
OIR    2025250     91400   18.5000 -111.3900      16.2        77       132        60
OIR    2025250     91400   18.5000 -111.4000      16.2        77       131        60
OIR    2025250     91400   18.5000 -111.4100      16.2        77       130        60
OIR    2025250     91400   18.5000 -111.4200      16.2        77       129        60
OIR    2025250     91400   18.5000 -111.4300      16.2        77       130        60
OIR    2025250     91400   18.5000 -111.4400      16.2        77       130        60
OIR    2025250     91400   18.5000 -111.4500      16.2        77       129        60
OIR    2025250     91400   18.5000 -111.4600      16.2        77       129        60
OIR    2025250     91400   18.5000 -111.4700      16.2        77       128        60
OIR    2025250     91400   18.5000 -111.4800      16.2        77       126        60
OIR    2025250     91400   18.5000 -111.4900      16.3        77       126        60
OIR    2025250     91400   18.5000 -111.5000      16.5        78       130        60
OIR    2025250     91400   18.5000 -111.5100      17.8        84       133        60
OIR    2025250     91400   18.5000 -111.5200      20.6        96       134        60
OIR    2025250     91400   18.5000 -111.5300      22.4       107       135        60
OIR    2025250     91400   18.5000 -111.5400      22.1       116       136        60
OIR    2025250     91400   18.5000 -111.5500      21.5       120       137        60
OIR    2025250     91400   18.5000 -111.5600      21.3       121       137        60
OIR    2025250     91400   18.5000 -111.5700      21.0       121       135        60
OIR    2025250     91400   18.5000 -111.5800      20.2       123       135        60
OIR    2025250     91400   18.5000 -111.5900      17.6       124       128        60
OIR    2025250     91400   18.5000 -111.6000      16.3       124       120        60
OIR    2025250     91400   18.5000 -111.6100      16.2       124       115        60
OIR    2025250     91400   18.5000 -111.6200      14.5       122       113        60
OIR    2025250     91400   18.5000 -111.6300      12.1       124       111        60
OIR    2025250     91400   18.5000 -111.6400      10.7       127       112        60
OIR    2025250     91400   18.5000 -111.6500       9.9       125       113        60
OIR    2025250     91400   18.5000 -111.6600       6.4       119       123        60
OIR    2025250     91400   18.5000 -111.6700       5.1       129       136        60
OIR    2025250     91400   18.5000 -111.7100       5.4       161       143        60
OIR    2025250     91400   18.5000 -111.7200       5.5       160       142        60
OIR    2025250     91400   18.5000 -111.8200       4.5        83       137        60
OIR    2025250     91400   18.5000 -111.8300       5.6        75       139        60
OIR    2025250     91400   18.5000 -111.8400       6.9        70       141        60
OIR    2025250     91400   18.5000 -111.8500       7.9        66       142        60
OIR    2025250     91400   18.5000 -112.7900       4.8       123       142        60
OIR    2025250     91400   18.5000 -112.8000       4.9       125       142        60
OIR    2025250     91400   18.5000 -112.8400       5.7       139       143        60
OIR    2025250     91400   18.5000 -112.8500       5.8       139       141        60
OIR    2025250     91400   18.5000 -112.8600       6.2       137       140        60
OIR    2025250     91400   18.5000 -112.8700       6.3       133       140        60
OIR    2025250     91400   18.5000 -112.8800       6.4       131       140        60
OIR    2025250     91400   18.5000 -112.8900       5.6       125       139        60
OIR    2025250     91400   18.5000 -112.9000       5.1       121       136        60
OIR    2025250     91400   18.5000 -112.9100       4.9       118       133        60
OIR    2025250     91400   18.5000 -112.9200       4.7       115       133        60
OIR    2025250     91400   18.5000 -112.9300       4.5       116       133        60
OIR    2025250     91400   18.5000 -112.9400       4.3       122       135        60
OIR    2025250     91400   18.5000 -112.9500       4.2       128       136        60
OIR    2025250     91400   18.5000 -112.9600       4.0       132       139        60
OIR    2025250     91400   18.5000 -113.2900       5.0       160       142        60
OIR    2025250     91400   18.5000 -113.3000       5.0       159       140        60
OIR    2025250     91400   18.5000 -113.3100       5.0       159       141        60
OIR    2025250     91400   18.5000 -113.3200       5.1       158       142        60
OIR    2025250     91400   18.5000 -113.3300       5.1       156       140        60
OIR    2025250     91400   18.5000 -113.3400       5.2       153       135        60
OIR    2025250     91400   18.5000 -113.3500       5.4       150       131        60
OIR    2025250     91400   18.5000 -113.3600       5.6       147       132        60
OIR    2025250     91400   18.5000 -113.3700       5.7       144       132        60
OIR    2025250     91400   18.5000 -113.3800       5.8       141       132        60
OIR    2025250     91400   18.5000 -113.3900       5.8       138       132        60
OIR    2025250     91400   18.5000 -113.4000       5.7       134       131        60
OIR    2025250     91400   18.5000 -113.4100       5.6       130       128        60
OIR    2025250     91400   18.5000 -113.4200       5.4       124       124        60
OIR    2025250     91400   18.5000 -113.4300       4.7       116       117        60
OIR    2025250     91400   18.5000 -113.5000       4.5       211       121        60
OIR    2025250     91400   18.5000 -113.5100       4.7       208       125        60
OIR    2025250     91400   18.5000 -113.5200       4.6       205       127        60
OIR    2025250     91400   18.5000 -113.5300       4.4       202       128        60
OIR    2025250     91400   18.5000 -113.5400       4.3       200       127        60
OIR    2025250     91400   18.5000 -113.5500       4.2       199       127        60
OIR    2025250     91400   18.5000 -113.5600       4.1       198       129        60
OIR    2025250     91400   18.5000 -113.5700       4.0       196       131        60
OIR    2025250     91400   18.5000 -113.5800       4.0       194       132        60
OIR    2025250     91400   18.5000 -113.5900       4.0       190       132        60
OIR    2025250     91400   18.5000 -113.6000       4.2       186       132        60
OIR    2025250     91400   18.5000 -113.6100       4.1       183       133        60
OIR    2025250     91400   18.5000 -113.6700       4.2       186       135        60
OIR    2025250     91400   18.5000 -113.6800       5.6       192       135        60
OIR    2025250     91400   18.5000 -113.6900       6.6       196       135        60
OIR    2025250     91400   18.5000 -113.7000       7.1       201       135        60
OIR    2025250     91400   18.5000 -113.7100       7.4       206       135        60
OIR    2025250     91400   18.5000 -113.7200       7.7       209       137        60
OIR    2025250     91400   18.5000 -113.7300       7.9       209       140        60
OIR    2025250     91400   18.5000 -113.7400       8.1       206       143        60
OIR    2025250     91400   18.5000 -113.7700       8.4       203       142        60
OIR    2025250     91400   18.5000 -113.7800       8.5       201       139        60
OIR    2025250     91400   18.5000 -113.7900       8.6       201       136        60
OIR    2025250     91400   18.5000 -113.8000       8.8       200       132        60
OIR    2025250     91400   18.5000 -113.8100       8.9       200       130        60
OIR    2025250     91400   18.5000 -113.8200       8.9       199       131        60
OIR    2025250     91400   18.5000 -113.8300       8.7       199       131        60
OIR    2025250     91400   18.5000 -113.8400       8.5       198       129        60
OIR    2025250     91400   18.5000 -113.8500       8.2       198       128        60
OIR    2025250     91400   18.5000 -113.8600       8.1       198       132        60
OIR    2025250     91400   18.5000 -113.8700       8.1       197       138        60
OIR    2025250     91400   18.5000 -113.8800       8.0       197       141        60
OIR    2025250     91400   18.5000 -113.9100       8.7       190       141        60
OIR    2025250     91400   18.5000 -113.9200       9.6       189       139        60
OIR    2025250     91400   18.5000 -113.9900       9.1       177       137        60
OIR    2025250     91400   18.5000 -114.0000       8.9       177       137        60
OIR    2025250     91400   18.5000 -114.0100       8.8       177       137        60
OIR    2025250     91400   18.5000 -114.1400      11.5       181       141        60
OIR    2025250     91400   18.5000 -114.1500      11.6       181       138        60
OIR    2025250     91400   18.5000 -114.1600      11.6       181       142        60
OIR    2025250     91400   18.5000 -114.2600      12.7       194       142        60
OIR    2025250     91400   18.5000 -114.2700      12.7       196       140        60
OIR    2025250     91400   18.5000 -114.2800      12.7       196       138        60
OIR    2025250     91400   18.5000 -114.2900      12.7       196       140        60
OIR    2025250     91400   18.5000 -114.3000      12.8       197       143        60
OIR    2025250     91400   18.5000 -114.4100      11.8       207       142        60
OIR    2025250     91400   18.5000 -114.4200      11.7       207       139        60
OIR    2025250     91400   18.5000 -114.4300      11.6       207       137        60
OIR    2025250     91400   18.5000 -114.4400      11.6       207       136        60
OIR    2025250     91400   18.5000 -114.4500      11.5       207       136        60
OIR    2025250     91400   18.5000 -114.4600      11.5       207       137        60
OIR    2025250     91400   18.5000 -114.4700      11.4       207       140        60
OIR    2025250     91400   18.4900 -108.7600      14.0        59       143        60
OIR    2025250     91400   18.4900 -108.7700      14.1        59       140        60
OIR    2025250     91400   18.4900 -108.7800      14.2        59       138        60
OIR    2025250     91400   18.4900 -108.7900      14.2        59       136        60
OIR    2025250     91400   18.4900 -108.8000      14.3        59       135        60
OIR    2025250     91400   18.4900 -108.8100      14.3        59       135        60
OIR    2025250     91400   18.4900 -108.8200      14.3        59       135        60
OIR    2025250     91400   18.4900 -108.8300      14.4        59       133        60
OIR    2025250     91400   18.4900 -108.8400      14.4        59       131        60
OIR    2025250     91400   18.4900 -108.8500      14.5        58       129        60
OIR    2025250     91400   18.4900 -108.8600      14.6        58       128        60
OIR    2025250     91400   18.4900 -108.8700      14.6        58       127        60
OIR    2025250     91400   18.4900 -108.8800      14.6        58       127        60
OIR    2025250     91400   18.4900 -108.8900      14.6        58       127        60
OIR    2025250     91400   18.4900 -108.9000      14.6        58       126        60
OIR    2025250     91400   18.4900 -108.9100      14.7        58       124        60
OIR    2025250     91400   18.4900 -108.9200      14.7        58       122        60
OIR    2025250     91400   18.4900 -108.9300      14.7        57       121        60
OIR    2025250     91400   18.4900 -108.9400      14.8        57       120        60
OIR    2025250     91400   18.4900 -108.9500      14.8        57       121        60
OIR    2025250     91400   18.4900 -108.9600      14.8        58       122        60
OIR    2025250     91400   18.4900 -108.9700      14.8        58       123        60
OIR    2025250     91400   18.4900 -108.9800      14.9        58       125        60
OIR    2025250     91400   18.4900 -108.9900      14.9        58       127        60
OIR    2025250     91400   18.4900 -109.0000      14.9        58       128        60
OIR    2025250     91400   18.4900 -109.0100      14.9        58       129        60
OIR    2025250     91400   18.4900 -109.0200      14.9        58       130        60
OIR    2025250     91400   18.4900 -109.0300      14.9        58       130        60
OIR    2025250     91400   18.4900 -109.0400      14.9        58       130        60
OIR    2025250     91400   18.4900 -109.0500      14.9        58       130        60
OIR    2025250     91400   18.4900 -109.0600      14.9        58       130        60
OIR    2025250     91400   18.4900 -109.0700      14.9        58       130        60
OIR    2025250     91400   18.4900 -109.0800      14.9        58       129        60
OIR    2025250     91400   18.4900 -109.0900      14.9        58       129        60
OIR    2025250     91400   18.4900 -109.1000      14.9        58       132        60
OIR    2025250     91400   18.4900 -109.1100      14.9        58       135        60
OIR    2025250     91400   18.4900 -109.1200      14.9        58       138        60
OIR    2025250     91400   18.4900 -110.6000      17.5        55       141        60
OIR    2025250     91400   18.4900 -110.6100      17.5        55       140        60
OIR    2025250     91400   18.4900 -110.6200      17.5        55       141        60
OIR    2025250     91400   18.4900 -110.6500      17.5        55       141        60
OIR    2025250     91400   18.4900 -110.6600      17.5        55       140        60
OIR    2025250     91400   18.4900 -110.6700      17.5        55       138        60
OIR    2025250     91400   18.4900 -110.6800      17.5        55       136        60
OIR    2025250     91400   18.4900 -110.6900      17.5        56       138        60
OIR    2025250     91400   18.4900 -110.7000      17.5        56       142        60
OIR    2025250     91400   18.4900 -111.2300      15.4        73       143        60
OIR    2025250     91400   18.4900 -111.2400      15.9        76       142        60
OIR    2025250     91400   18.4900 -111.2500      16.3        77       141        60
OIR    2025250     91400   18.4900 -111.2600      16.3        78       141        60
OIR    2025250     91400   18.4900 -111.2700      16.2        78       142        60
OIR    2025250     91400   18.4900 -111.2800      15.8        78       143        60
OIR    2025250     91400   18.4900 -111.2900      15.9        78       142        60
OIR    2025250     91400   18.4900 -111.3000      15.5        77       140        60
OIR    2025250     91400   18.4900 -111.3100      15.2        76       137        60
OIR    2025250     91400   18.4900 -111.3200      15.5        76       133        60
OIR    2025250     91400   18.4900 -111.3300      16.0        76       131        60
OIR    2025250     91400   18.4900 -111.3400      16.2        76       130        60
OIR    2025250     91400   18.4900 -111.3500      16.2        76       129        60
OIR    2025250     91400   18.4900 -111.3600      16.2        77       129        60
OIR    2025250     91400   18.4900 -111.3700      16.2        77       129        60
OIR    2025250     91400   18.4900 -111.3800      16.1        77       130        60
OIR    2025250     91400   18.4900 -111.3900      16.1        77       131        60
OIR    2025250     91400   18.4900 -111.4000      16.1        77       131        60
OIR    2025250     91400   18.4900 -111.4100      16.1        77       129        60
OIR    2025250     91400   18.4900 -111.4200      16.1        77       127        60
OIR    2025250     91400   18.4900 -111.4300      16.1        77       128        60
OIR    2025250     91400   18.4900 -111.4400      16.2        77       129        60
OIR    2025250     91400   18.4900 -111.4500      16.2        77       128        60
OIR    2025250     91400   18.4900 -111.4600      16.2        77       127        60
OIR    2025250     91400   18.4900 -111.4700      16.2        77       125        60
OIR    2025250     91400   18.4900 -111.4800      16.2        77       125        60
OIR    2025250     91400   18.4900 -111.4900      16.2        77       124        60
OIR    2025250     91400   18.4900 -111.5000      17.0        79       128        60
OIR    2025250     91400   18.4900 -111.5100      21.1        87       132        60
OIR    2025250     91400   18.4900 -111.5200      24.5        95       133        60
OIR    2025250     91400   18.4900 -111.5300      25.8       101       134        60
OIR    2025250     91400   18.4900 -111.5400      23.6       106       134        60
OIR    2025250     91400   18.4900 -111.5500      22.4       117       129        60
OIR    2025250     91400   18.4900 -111.5600      22.3       121       125        60
OIR    2025250     91400   18.4900 -111.5700      21.3       121       123        60
OIR    2025250     91400   18.4900 -111.5800      20.4       121       122        60
OIR    2025250     91400   18.4900 -111.5900      18.1       121       117        60
OIR    2025250     91400   18.4900 -111.6000      17.7       123       112        60
OIR    2025250     91400   18.4900 -111.6100      17.3       123       107        60
OIR    2025250     91400   18.4900 -111.6200      15.7       120       105        60
OIR    2025250     91400   18.4900 -111.6300      14.3       122       104        60
OIR    2025250     91400   18.4900 -111.6400      11.7       125       105        60
OIR    2025250     91400   18.4900 -111.6500      10.5       125       107        60
OIR    2025250     91400   18.4900 -111.6600       6.5       124       116        60
OIR    2025250     91400   18.4900 -111.6700       5.6       132       131        60
OIR    2025250     91400   18.4900 -111.7800       4.2       188       142        60
OIR    2025250     91400   18.4900 -111.8300       4.8        78       141        60
OIR    2025250     91400   18.4900 -111.8400       5.9        73       142        60
OIR    2025250     91400   18.4900 -111.8500       7.1        69       142        60
OIR    2025250     91400   18.4900 -112.7700       5.2       122       140        60
OIR    2025250     91400   18.4900 -112.7800       5.3       123       137        60
OIR    2025250     91400   18.4900 -112.7900       5.3       124       137        60
OIR    2025250     91400   18.4900 -112.8000       5.3       125       138        60
OIR    2025250     91400   18.4900 -112.8100       5.3       127       140        60
OIR    2025250     91400   18.4900 -112.8200       5.4       130       142        60
OIR    2025250     91400   18.4900 -112.8300       5.4       131       141        60
OIR    2025250     91400   18.4900 -112.8400       5.4       131       139        60
OIR    2025250     91400   18.4900 -112.8500       5.4       130       137        60
OIR    2025250     91400   18.4900 -112.8600       5.6       130       136        60
OIR    2025250     91400   18.4900 -112.8700       5.5       127       134        60
OIR    2025250     91400   18.4900 -112.8800       5.5       125       135        60
OIR    2025250     91400   18.4900 -112.8900       5.3       123       135        60
OIR    2025250     91400   18.4900 -112.9000       5.1       122       134        60
OIR    2025250     91400   18.4900 -112.9100       5.1       121       132        60
OIR    2025250     91400   18.4900 -112.9200       5.0       120       131        60
OIR    2025250     91400   18.4900 -112.9300       4.8       120       131        60
OIR    2025250     91400   18.4900 -112.9400       4.6       122       131        60
OIR    2025250     91400   18.4900 -112.9500       4.4       127       132        60
OIR    2025250     91400   18.4900 -112.9600       4.2       131       134        60
OIR    2025250     91400   18.4900 -112.9700       4.1       133       139        60
OIR    2025250     91400   18.4900 -112.9800       4.0       132       144        60
OIR    2025250     91400   18.4900 -113.3000       5.0       160       143        60
OIR    2025250     91400   18.4900 -113.3100       5.0       159       142        60
OIR    2025250     91400   18.4900 -113.3200       4.9       158       141        60
OIR    2025250     91400   18.4900 -113.3300       4.9       156       139        60
OIR    2025250     91400   18.4900 -113.3400       5.0       153       135        60
OIR    2025250     91400   18.4900 -113.3500       5.2       148       131        60
OIR    2025250     91400   18.4900 -113.3600       5.3       145       132        60
OIR    2025250     91400   18.4900 -113.3700       5.4       141       132        60
OIR    2025250     91400   18.4900 -113.3800       5.5       138       132        60
OIR    2025250     91400   18.4900 -113.3900       5.5       133       132        60
OIR    2025250     91400   18.4900 -113.4000       5.5       130       132        60
OIR    2025250     91400   18.4900 -113.4100       5.4       126       129        60
OIR    2025250     91400   18.4900 -113.4200       5.1       117       126        60
OIR    2025250     91400   18.4900 -113.4300       4.4       109       121        60
OIR    2025250     91400   18.4900 -113.6700       4.6       182       138        60
OIR    2025250     91400   18.4900 -113.6800       5.8       187       138        60
OIR    2025250     91400   18.4900 -113.6900       6.5       191       138        60
OIR    2025250     91400   18.4900 -113.7000       7.0       197       139        60
OIR    2025250     91400   18.4900 -113.7100       7.4       202       139        60
OIR    2025250     91400   18.4900 -113.7200       7.7       205       140        60
OIR    2025250     91400   18.4900 -113.7300       7.9       205       142        60
OIR    2025250     91400   18.4900 -113.7700       8.2       203       141        60
OIR    2025250     91400   18.4900 -113.7800       8.3       201       138        60
OIR    2025250     91400   18.4900 -113.7900       8.3       200       134        60
OIR    2025250     91400   18.4900 -113.8000       8.4       200       131        60
OIR    2025250     91400   18.4900 -113.8100       8.6       199       129        60
OIR    2025250     91400   18.4900 -113.8200       8.5       199       130        60
OIR    2025250     91400   18.4900 -113.8300       8.5       199       130        60
OIR    2025250     91400   18.4900 -113.8400       8.3       198       130        60
OIR    2025250     91400   18.4900 -113.8500       8.1       198       130        60
OIR    2025250     91400   18.4900 -113.8600       8.1       198       131        60
OIR    2025250     91400   18.4900 -113.8700       8.0       197       134        60
OIR    2025250     91400   18.4900 -113.8800       8.0       197       137        60
OIR    2025250     91400   18.4900 -113.8900       8.0       196       140        60
OIR    2025250     91400   18.4900 -113.9000       8.0       195       142        60
OIR    2025250     91400   18.4900 -113.9100       8.2       189       139        60
OIR    2025250     91400   18.4900 -113.9200       8.9       189       136        60
OIR    2025250     91400   18.4900 -113.9300       9.4       187       140        60
OIR    2025250     91400   18.4900 -113.9900       9.0       177       139        60
OIR    2025250     91400   18.4900 -114.0000       8.8       177       138        60
OIR    2025250     91400   18.4900 -114.0100       8.8       177       138        60
OIR    2025250     91400   18.4900 -114.1500      11.6       181       142        60
OIR    2025250     91400   18.4900 -114.2600      12.8       193       143        60
OIR    2025250     91400   18.4900 -114.2700      12.8       195       140        60
OIR    2025250     91400   18.4900 -114.2800      12.7       196       138        60
OIR    2025250     91400   18.4900 -114.2900      12.7       196       138        60
OIR    2025250     91400   18.4900 -114.3000      12.6       197       141        60
OIR    2025250     91400   18.4900 -114.4100      11.8       207       142        60
OIR    2025250     91400   18.4900 -114.4200      11.7       207       138        60
OIR    2025250     91400   18.4900 -114.4300      11.6       207       137        60
OIR    2025250     91400   18.4900 -114.4400      11.5       207       136        60
OIR    2025250     91400   18.4900 -114.4500      11.5       207       136        60
OIR    2025250     91400   18.4900 -114.4600      11.4       207       137        60
OIR    2025250     91400   18.4900 -114.4700      11.4       208       139        60
OIR    2025250     91400   18.4800 -108.7400      13.6        56       142        60
OIR    2025250     91400   18.4800 -108.7500      14.0        58       140        60
OIR    2025250     91400   18.4800 -108.7600      14.1        59       138        60
OIR    2025250     91400   18.4800 -108.7700      14.2        59       136        60
OIR    2025250     91400   18.4800 -108.7800      14.2        59       134        60
OIR    2025250     91400   18.4800 -108.7900      14.3        59       132        60
OIR    2025250     91400   18.4800 -108.8000      14.3        59       131        60
OIR    2025250     91400   18.4800 -108.8100      14.3        59       131        60
OIR    2025250     91400   18.4800 -108.8200      14.4        59       130        60
OIR    2025250     91400   18.4800 -108.8300      14.4        58       130        60
OIR    2025250     91400   18.4800 -108.8400      14.5        58       129        60
OIR    2025250     91400   18.4800 -108.8500      14.5        58       127        60
OIR    2025250     91400   18.4800 -108.8600      14.5        58       126        60
OIR    2025250     91400   18.4800 -108.8700      14.6        58       125        60
OIR    2025250     91400   18.4800 -108.8800      14.6        58       124        60
OIR    2025250     91400   18.4800 -108.8900      14.6        58       124        60
OIR    2025250     91400   18.4800 -108.9000      14.6        58       123        60
OIR    2025250     91400   18.4800 -108.9100      14.7        58       122        60
OIR    2025250     91400   18.4800 -108.9200      14.7        58       121        60
OIR    2025250     91400   18.4800 -108.9300      14.7        58       119        60
OIR    2025250     91400   18.4800 -108.9400      14.8        58       116        60
OIR    2025250     91400   18.4800 -108.9500      14.8        58       117        60
OIR    2025250     91400   18.4800 -108.9600      14.8        58       120        60
OIR    2025250     91400   18.4800 -108.9700      14.8        58       122        60
OIR    2025250     91400   18.4800 -108.9800      14.8        58       124        60
OIR    2025250     91400   18.4800 -108.9900      14.8        58       127        60
OIR    2025250     91400   18.4800 -109.0000      14.9        58       128        60
OIR    2025250     91400   18.4800 -109.0100      14.9        58       128        60
OIR    2025250     91400   18.4800 -109.0200      14.9        58       129        60
OIR    2025250     91400   18.4800 -109.0300      14.9        58       128        60
OIR    2025250     91400   18.4800 -109.0400      14.9        58       127        60
OIR    2025250     91400   18.4800 -109.0500      14.9        58       127        60
OIR    2025250     91400   18.4800 -109.0600      14.9        58       126        60
OIR    2025250     91400   18.4800 -109.0700      14.9        58       126        60
OIR    2025250     91400   18.4800 -109.0800      14.9        58       125        60
OIR    2025250     91400   18.4800 -109.0900      14.9        58       124        60
OIR    2025250     91400   18.4800 -109.1000      14.9        58       127        60
OIR    2025250     91400   18.4800 -109.1100      14.9        58       129        60
OIR    2025250     91400   18.4800 -109.1200      14.9        58       132        60
OIR    2025250     91400   18.4800 -109.1300      14.9        58       136        60
OIR    2025250     91400   18.4800 -109.1400      14.9        58       139        60
OIR    2025250     91400   18.4800 -109.1500      14.9        58       141        60
OIR    2025250     91400   18.4800 -109.1600      14.9        57       142        60
OIR    2025250     91400   18.4800 -110.6600      17.4        55       141        60
OIR    2025250     91400   18.4800 -110.6700      17.5        55       139        60
OIR    2025250     91400   18.4800 -110.6800      17.5        55       137        60
OIR    2025250     91400   18.4800 -110.6900      17.5        56       138        60
OIR    2025250     91400   18.4800 -110.7000      17.4        56       141        60
OIR    2025250     91400   18.4800 -110.7400      17.4        56       142        60
OIR    2025250     91400   18.4800 -110.7500      17.4        56       142        60
OIR    2025250     91400   18.4800 -111.2500      15.1        74       143        60
OIR    2025250     91400   18.4800 -111.2600      15.3        76       142        60
OIR    2025250     91400   18.4800 -111.2900      14.7        76       143        60
OIR    2025250     91400   18.4800 -111.3000      14.2        74       141        60
OIR    2025250     91400   18.4800 -111.3100      14.1        73       139        60
OIR    2025250     91400   18.4800 -111.3200      14.5        73       136        60
OIR    2025250     91400   18.4800 -111.3300      15.4        74       133        60
OIR    2025250     91400   18.4800 -111.3400      15.8        75       131        60
OIR    2025250     91400   18.4800 -111.3500      16.0        76       129        60
OIR    2025250     91400   18.4800 -111.3600      16.0        76       128        60
OIR    2025250     91400   18.4800 -111.3700      16.0        77       127        60
OIR    2025250     91400   18.4800 -111.3800      16.1        77       128        60
OIR    2025250     91400   18.4800 -111.3900      16.1        77       130        60
OIR    2025250     91400   18.4800 -111.4000      16.1        77       132        60
OIR    2025250     91400   18.4800 -111.4100      16.1        77       128        60
OIR    2025250     91400   18.4800 -111.4200      16.1        77       125        60
OIR    2025250     91400   18.4800 -111.4300      16.1        77       126        60
OIR    2025250     91400   18.4800 -111.4400      16.1        77       128        60
OIR    2025250     91400   18.4800 -111.4500      16.1        77       128        60
OIR    2025250     91400   18.4800 -111.4600      16.2        77       125        60
OIR    2025250     91400   18.4800 -111.4700      16.2        77       122        60
OIR    2025250     91400   18.4800 -111.4800      16.2        77       123        60
OIR    2025250     91400   18.4800 -111.4900      16.2        77       123        60
OIR    2025250     91400   18.4800 -111.5000      17.8        80       126        60
OIR    2025250     91400   18.4800 -111.5100      24.9        90       130        60
OIR    2025250     91400   18.4800 -111.5200      26.2        93       132        60
OIR    2025250     91400   18.4800 -111.5300      26.4        96       132        60
OIR    2025250     91400   18.4800 -111.5400      25.0       102       133        60
OIR    2025250     91400   18.4800 -111.5500      25.0       112       123        60
OIR    2025250     91400   18.4800 -111.5600      24.0       118       112        60
OIR    2025250     91400   18.4800 -111.5700      21.3       116       108        60
OIR    2025250     91400   18.4800 -111.5800      19.6       116       108        60
OIR    2025250     91400   18.4800 -111.5900      18.0       116       107        60
OIR    2025250     91400   18.4800 -111.6000      17.5       118       105        60
OIR    2025250     91400   18.4800 -111.6100      17.1       119       104        60
OIR    2025250     91400   18.4800 -111.6200      16.0       116       104        60
OIR    2025250     91400   18.4800 -111.6300      15.0       115       104        60
OIR    2025250     91400   18.4800 -111.6400      12.6       121       104        60
OIR    2025250     91400   18.4800 -111.6500       9.9       125       105        60
OIR    2025250     91400   18.4800 -111.6600       6.6       128       113        60
OIR    2025250     91400   18.4800 -111.6700       5.7       136       127        60
OIR    2025250     91400   18.4800 -111.6800       5.3       147       141        60
OIR    2025250     91400   18.4800 -111.8400       4.9        78       142        60
OIR    2025250     91400   18.4800 -111.8500       6.2        71       142        60
OIR    2025250     91400   18.4800 -111.8600       8.0        65       142        60
OIR    2025250     91400   18.4800 -111.8700       8.7        64       142        60
OIR    2025250     91400   18.4800 -111.8800       8.9        64       143        60
OIR    2025250     91400   18.4800 -112.7600       5.3       122       141        60
OIR    2025250     91400   18.4800 -112.7700       5.3       123       135        60
OIR    2025250     91400   18.4800 -112.7800       5.3       124       130        60
OIR    2025250     91400   18.4800 -112.7900       5.3       124       132        60
OIR    2025250     91400   18.4800 -112.8000       5.3       125       134        60
OIR    2025250     91400   18.4800 -112.8100       5.4       126       136        60
OIR    2025250     91400   18.4800 -112.8200       5.4       127       137        60
OIR    2025250     91400   18.4800 -112.8300       5.4       127       136        60
OIR    2025250     91400   18.4800 -112.8400       5.3       127       135        60
OIR    2025250     91400   18.4800 -112.8500       5.3       126       134        60
OIR    2025250     91400   18.4800 -112.8600       5.3       124       132        60
OIR    2025250     91400   18.4800 -112.8700       5.3       123       130        60
OIR    2025250     91400   18.4800 -112.8800       5.3       123       130        60
OIR    2025250     91400   18.4800 -112.8900       5.2       123       130        60
OIR    2025250     91400   18.4800 -112.9000       5.2       122       130        60
OIR    2025250     91400   18.4800 -112.9100       5.1       121       130        60
OIR    2025250     91400   18.4800 -112.9200       5.0       121       130        60
OIR    2025250     91400   18.4800 -112.9300       5.0       120       130        60
OIR    2025250     91400   18.4800 -112.9400       4.9       121       130        60
OIR    2025250     91400   18.4800 -112.9500       4.7       122       132        60
OIR    2025250     91400   18.4800 -112.9600       4.5       123       133        60
OIR    2025250     91400   18.4800 -112.9700       4.4       122       136        60
OIR    2025250     91400   18.4800 -112.9800       4.2       117       139        60
OIR    2025250     91400   18.4800 -113.3100       4.9       158       143        60
OIR    2025250     91400   18.4800 -113.3200       4.9       157       141        60
OIR    2025250     91400   18.4800 -113.3300       4.9       155       139        60
OIR    2025250     91400   18.4800 -113.3400       4.9       151       136        60
OIR    2025250     91400   18.4800 -113.3500       5.0       146       133        60
OIR    2025250     91400   18.4800 -113.3600       5.1       143       132        60
OIR    2025250     91400   18.4800 -113.3700       5.2       139       132        60
OIR    2025250     91400   18.4800 -113.3800       5.2       135       132        60
OIR    2025250     91400   18.4800 -113.3900       5.3       130       132        60
OIR    2025250     91400   18.4800 -113.4000       5.3       127       132        60
OIR    2025250     91400   18.4800 -113.4100       5.2       123       129        60
OIR    2025250     91400   18.4800 -113.4200       4.9       114       126        60
OIR    2025250     91400   18.4800 -113.4300       4.5       107       124        60
OIR    2025250     91400   18.4800 -113.4400       4.0       102       121        60
OIR    2025250     91400   18.4800 -113.6700       4.7       179       143        60
OIR    2025250     91400   18.4800 -113.7600       7.9       204       143        60
OIR    2025250     91400   18.4800 -113.7700       8.0       203       141        60
OIR    2025250     91400   18.4800 -113.7800       8.0       202       138        60
OIR    2025250     91400   18.4800 -113.7900       8.0       200       136        60
OIR    2025250     91400   18.4800 -113.8000       8.0       199       133        60
OIR    2025250     91400   18.4800 -113.8100       8.0       199       130        60
OIR    2025250     91400   18.4800 -113.8200       8.0       198       130        60
OIR    2025250     91400   18.4800 -113.8300       7.9       198       130        60
OIR    2025250     91400   18.4800 -113.8400       7.9       198       130        60
OIR    2025250     91400   18.4800 -113.8500       7.9       198       130        60
OIR    2025250     91400   18.4800 -113.8600       7.9       198       132        60
OIR    2025250     91400   18.4800 -113.8700       7.9       197       136        60
OIR    2025250     91400   18.4800 -113.8800       7.9       196       139        60
OIR    2025250     91400   18.4800 -113.8900       7.9       196       142        60
OIR    2025250     91400   18.4800 -113.9100       8.1       187       140        60
OIR    2025250     91400   18.4800 -113.9200       8.4       188       135        60
OIR    2025250     91400   18.4800 -113.9300       8.7       186       136        60
OIR    2025250     91400   18.4800 -113.9400       8.7       184       140        60
OIR    2025250     91400   18.4800 -114.2600      12.9       192       143        60
OIR    2025250     91400   18.4800 -114.2700      12.8       195       140        60
OIR    2025250     91400   18.4800 -114.2800      12.7       196       139        60
OIR    2025250     91400   18.4800 -114.2900      12.6       197       138        60
OIR    2025250     91400   18.4800 -114.3000      12.4       198       139        60
OIR    2025250     91400   18.4800 -114.3100      12.3       199       141        60
OIR    2025250     91400   18.4800 -114.4200      11.7       208       142        60
OIR    2025250     91400   18.4800 -114.4300      11.6       208       140        60
OIR    2025250     91400   18.4800 -114.4400      11.5       208       138        60
OIR    2025250     91400   18.4800 -114.4500      11.5       208       137        60
OIR    2025250     91400   18.4800 -114.4600      11.4       208       138        60
OIR    2025250     91400   18.4800 -114.4700      11.3       208       140        60
OIR    2025250     91400   18.4700 -108.7000      12.9        45       141        60
OIR    2025250     91400   18.4700 -108.7100      13.5        49       140        60
OIR    2025250     91400   18.4700 -108.7200      13.7        51       140        60
OIR    2025250     91400   18.4700 -108.7300      13.8        53       139        60
OIR    2025250     91400   18.4700 -108.7400      13.9        55       138        60
OIR    2025250     91400   18.4700 -108.7500      14.1        58       136        60
OIR    2025250     91400   18.4700 -108.7600      14.2        58       134        60
OIR    2025250     91400   18.4700 -108.7700      14.2        58       133        60
OIR    2025250     91400   18.4700 -108.7800      14.3        58       131        60
OIR    2025250     91400   18.4700 -108.7900      14.3        58       129        60
OIR    2025250     91400   18.4700 -108.8000      14.3        59       128        60
OIR    2025250     91400   18.4700 -108.8100      14.4        59       127        60
OIR    2025250     91400   18.4700 -108.8200      14.4        58       127        60
OIR    2025250     91400   18.4700 -108.8300      14.5        58       127        60
OIR    2025250     91400   18.4700 -108.8400      14.5        58       127        60
OIR    2025250     91400   18.4700 -108.8500      14.5        58       126        60
OIR    2025250     91400   18.4700 -108.8600      14.5        58       125        60
OIR    2025250     91400   18.4700 -108.8700      14.6        58       124        60
OIR    2025250     91400   18.4700 -108.8800      14.6        58       124        60
OIR    2025250     91400   18.4700 -108.8900      14.6        58       124        60
OIR    2025250     91400   18.4700 -108.9000      14.6        58       123        60
OIR    2025250     91400   18.4700 -108.9100      14.6        58       122        60
OIR    2025250     91400   18.4700 -108.9200      14.7        58       122        60
OIR    2025250     91400   18.4700 -108.9300      14.7        58       120        60
OIR    2025250     91400   18.4700 -108.9400      14.7        58       119        60
OIR    2025250     91400   18.4700 -108.9500      14.8        58       117        60
OIR    2025250     91400   18.4700 -108.9600      14.8        58       119        60
OIR    2025250     91400   18.4700 -108.9700      14.8        58       120        60
OIR    2025250     91400   18.4700 -108.9800      14.8        58       122        60
OIR    2025250     91400   18.4700 -108.9900      14.8        58       125        60
OIR    2025250     91400   18.4700 -109.0000      14.8        58       126        60
OIR    2025250     91400   18.4700 -109.0100      14.9        58       127        60
OIR    2025250     91400   18.4700 -109.0200      14.9        58       128        60
OIR    2025250     91400   18.4700 -109.0300      14.9        58       127        60
OIR    2025250     91400   18.4700 -109.0400      14.9        58       126        60
OIR    2025250     91400   18.4700 -109.0500      14.9        58       125        60
OIR    2025250     91400   18.4700 -109.0600      14.9        58       125        60
OIR    2025250     91400   18.4700 -109.0700      14.9        58       124        60
OIR    2025250     91400   18.4700 -109.0800      14.9        58       123        60
OIR    2025250     91400   18.4700 -109.0900      14.9        58       122        60
OIR    2025250     91400   18.4700 -109.1000      14.9        58       122        60
OIR    2025250     91400   18.4700 -109.1100      14.9        58       124        60
OIR    2025250     91400   18.4700 -109.1200      14.9        58       126        60
OIR    2025250     91400   18.4700 -109.1300      14.9        58       129        60
OIR    2025250     91400   18.4700 -109.1400      14.9        58       132        60
OIR    2025250     91400   18.4700 -109.1500      14.9        58       134        60
OIR    2025250     91400   18.4700 -109.1600      14.9        57       136        60
OIR    2025250     91400   18.4700 -109.1700      14.9        57       138        60
OIR    2025250     91400   18.4700 -110.6600      17.4        55       141        60
OIR    2025250     91400   18.4700 -110.6700      17.4        55       139        60
OIR    2025250     91400   18.4700 -110.6800      17.4        55       139        60
OIR    2025250     91400   18.4700 -110.6900      17.4        56       138        60
OIR    2025250     91400   18.4700 -110.7000      17.4        56       139        60
OIR    2025250     91400   18.4700 -110.7100      17.4        56       140        60
OIR    2025250     91400   18.4700 -110.7200      17.4        56       140        60
OIR    2025250     91400   18.4700 -110.7300      17.4        56       140        60
OIR    2025250     91400   18.4700 -110.7400      17.4        56       141        60
OIR    2025250     91400   18.4700 -110.7500      17.4        56       141        60
OIR    2025250     91400   18.4700 -110.7600      17.4        56       141        60
OIR    2025250     91400   18.4700 -110.7700      17.4        56       143        60
OIR    2025250     91400   18.4700 -111.3000      13.1        72       143        60
OIR    2025250     91400   18.4700 -111.3100      13.2        71       141        60
OIR    2025250     91400   18.4700 -111.3200      13.6        71       138        60
OIR    2025250     91400   18.4700 -111.3300      14.2        72       136        60
OIR    2025250     91400   18.4700 -111.3400      14.9        73       132        60
OIR    2025250     91400   18.4700 -111.3500      15.4        74       129        60
OIR    2025250     91400   18.4700 -111.3600      15.4        76       128        60
OIR    2025250     91400   18.4700 -111.3700      15.7        76       128        60
OIR    2025250     91400   18.4700 -111.3800      15.8        76       129        60
OIR    2025250     91400   18.4700 -111.3900      15.9        76       129        60
OIR    2025250     91400   18.4700 -111.4000      16.0        77       130        60
OIR    2025250     91400   18.4700 -111.4100      16.0        77       128        60
OIR    2025250     91400   18.4700 -111.4200      16.1        77       124        60
OIR    2025250     91400   18.4700 -111.4300      16.1        77       123        60
OIR    2025250     91400   18.4700 -111.4400      16.1        77       125        60
OIR    2025250     91400   18.4700 -111.4500      16.1        77       125        60
OIR    2025250     91400   18.4700 -111.4600      16.1        77       124        60
OIR    2025250     91400   18.4700 -111.4700      16.1        77       122        60
OIR    2025250     91400   18.4700 -111.4800      16.2        77       124        60
OIR    2025250     91400   18.4700 -111.4900      16.2        77       126        60
OIR    2025250     91400   18.4700 -111.5000      18.8        81       128        60
OIR    2025250     91400   18.4700 -111.5100      26.4        90       129        60
OIR    2025250     91400   18.4700 -111.5200      26.4        91       129        60
OIR    2025250     91400   18.4700 -111.5300      26.1        93       126        60
OIR    2025250     91400   18.4700 -111.5400      26.0       100       123        60
OIR    2025250     91400   18.4700 -111.5500      25.2       107       116        60
OIR    2025250     91400   18.4700 -111.5600      23.7       114       108        60
OIR    2025250     91400   18.4700 -111.5700      21.7       115       103        60
OIR    2025250     91400   18.4700 -111.5800      20.5       116       103        60
OIR    2025250     91400   18.4700 -111.5900      18.7       116       103        60
OIR    2025250     91400   18.4700 -111.6000      17.7       117       103        60
OIR    2025250     91400   18.4700 -111.6100      17.1       117       103        60
OIR    2025250     91400   18.4700 -111.6200      16.1       115       103        60
OIR    2025250     91400   18.4700 -111.6300      15.3       114       103        60
OIR    2025250     91400   18.4700 -111.6400      12.9       113       103        60
OIR    2025250     91400   18.4700 -111.6500       8.7       120       104        60
OIR    2025250     91400   18.4700 -111.6600       6.6       128       108        60
OIR    2025250     91400   18.4700 -111.6700       5.5       136       122        60
OIR    2025250     91400   18.4700 -111.6800       5.3       141       136        60
OIR    2025250     91400   18.4700 -111.8400       4.0        89       142        60
OIR    2025250     91400   18.4700 -111.8500       5.3        79       142        60
OIR    2025250     91400   18.4700 -111.8600       7.1        71       141        60
OIR    2025250     91400   18.4700 -111.8700       8.4        68       140        60
OIR    2025250     91400   18.4700 -111.8800       8.9        68       141        60
OIR    2025250     91400   18.4700 -111.8900       9.2        69       142        60
OIR    2025250     91400   18.4700 -112.7400       5.0       119       142        60
OIR    2025250     91400   18.4700 -112.7500       5.3       122       142        60
OIR    2025250     91400   18.4700 -112.7600       5.4       123       139        60
OIR    2025250     91400   18.4700 -112.7700       5.4       123       134        60
OIR    2025250     91400   18.4700 -112.7800       5.4       124       129        60
OIR    2025250     91400   18.4700 -112.7900       5.4       124       130        60
OIR    2025250     91400   18.4700 -112.8000       5.4       124       131        60
OIR    2025250     91400   18.4700 -112.8100       5.4       124       132        60
OIR    2025250     91400   18.4700 -112.8200       5.4       124       133        60
OIR    2025250     91400   18.4700 -112.8300       5.4       125       133        60
OIR    2025250     91400   18.4700 -112.8400       5.4       124       132        60
OIR    2025250     91400   18.4700 -112.8500       5.3       124       131        60
OIR    2025250     91400   18.4700 -112.8600       5.3       124       130        60
OIR    2025250     91400   18.4700 -112.8700       5.3       123       129        60
OIR    2025250     91400   18.4700 -112.8800       5.3       123       128        60
OIR    2025250     91400   18.4700 -112.8900       5.3       123       128        60
OIR    2025250     91400   18.4700 -112.9000       5.2       122       128        60
OIR    2025250     91400   18.4700 -112.9100       5.2       122       128        60
OIR    2025250     91400   18.4700 -112.9200       5.1       121       129        60
OIR    2025250     91400   18.4700 -112.9300       5.0       120       129        60
OIR    2025250     91400   18.4700 -112.9400       5.0       120       130        60
OIR    2025250     91400   18.4700 -112.9500       4.8       119       131        60
OIR    2025250     91400   18.4700 -112.9600       4.7       117       132        60
OIR    2025250     91400   18.4700 -112.9700       4.5       112       134        60
OIR    2025250     91400   18.4700 -112.9800       4.1       100       136        60
OIR    2025250     91400   18.4700 -113.3100       4.8       158       142        60
OIR    2025250     91400   18.4700 -113.3200       4.8       156       141        60
OIR    2025250     91400   18.4700 -113.3300       4.8       153       140        60
OIR    2025250     91400   18.4700 -113.3400       4.8       149       138        60
OIR    2025250     91400   18.4700 -113.3500       4.9       144       136        60
OIR    2025250     91400   18.4700 -113.3600       4.9       140       133        60
OIR    2025250     91400   18.4700 -113.3700       5.0       136       131        60
OIR    2025250     91400   18.4700 -113.3800       5.1       132       130        60
OIR    2025250     91400   18.4700 -113.3900       5.2       127       129        60
OIR    2025250     91400   18.4700 -113.4000       5.2       124       129        60
OIR    2025250     91400   18.4700 -113.4100       5.1       122       127        60
OIR    2025250     91400   18.4700 -113.4200       4.9       114       126        60
OIR    2025250     91400   18.4700 -113.4300       4.6       107       125        60
OIR    2025250     91400   18.4700 -113.4400       4.2       102       125        60
OIR    2025250     91400   18.4700 -113.7600       7.9       204       142        60
OIR    2025250     91400   18.4700 -113.7700       7.9       203       140        60
OIR    2025250     91400   18.4700 -113.7800       7.9       201       138        60
OIR    2025250     91400   18.4700 -113.7900       7.9       200       136        60
OIR    2025250     91400   18.4700 -113.8000       7.9       199       134        60
OIR    2025250     91400   18.4700 -113.8100       7.9       198       132        60
OIR    2025250     91400   18.4700 -113.8200       7.9       198       131        60
OIR    2025250     91400   18.4700 -113.8300       7.9       198       131        60
OIR    2025250     91400   18.4700 -113.8400       7.9       198       130        60
OIR    2025250     91400   18.4700 -113.8500       7.9       198       130        60
OIR    2025250     91400   18.4700 -113.8600       7.9       198       132        60
OIR    2025250     91400   18.4700 -113.8700       7.9       197       137        60
OIR    2025250     91400   18.4700 -113.8800       7.9       196       142        60
OIR    2025250     91400   18.4700 -113.9200       8.1       186       137        60
OIR    2025250     91400   18.4700 -113.9300       8.0       183       133        60
OIR    2025250     91400   18.4700 -113.9400       7.8       178       135        60
OIR    2025250     91400   18.4700 -113.9500       7.8       174       139        60
OIR    2025250     91400   18.4700 -114.1500      11.6       181       142        60
OIR    2025250     91400   18.4700 -114.1600      11.7       181       142        60
OIR    2025250     91400   18.4700 -114.1900      11.8       182       142        60
OIR    2025250     91400   18.4700 -114.2000      11.8       182       141        60
OIR    2025250     91400   18.4700 -114.2600      12.9       191       142        60
OIR    2025250     91400   18.4700 -114.2700      12.5       195       141        60
OIR    2025250     91400   18.4700 -114.2800      12.3       197       140        60
OIR    2025250     91400   18.4700 -114.2900      12.3       198       138        60
OIR    2025250     91400   18.4700 -114.3000      12.2       199       138        60
OIR    2025250     91400   18.4700 -114.3100      12.3       199       138        60
OIR    2025250     91400   18.4700 -114.3200      12.2       201       142        60
OIR    2025250     91400   18.4700 -114.4200      11.7       208       142        60
OIR    2025250     91400   18.4700 -114.4300      11.6       208       141        60
OIR    2025250     91400   18.4700 -114.4400      11.5       208       139        60
OIR    2025250     91400   18.4700 -114.4500      11.4       208       138        60
OIR    2025250     91400   18.4700 -114.4600      11.4       208       139        60
OIR    2025250     91400   18.4700 -114.4700      11.3       208       140        60
OIR    2025250     91400   18.4600 -108.7000      13.7        51       138        60
OIR    2025250     91400   18.4600 -108.7100      13.8        51       135        60
OIR    2025250     91400   18.4600 -108.7200      13.9        52       135        60
OIR    2025250     91400   18.4600 -108.7300      14.0        53       135        60
OIR    2025250     91400   18.4600 -108.7400      14.0        54       133        60
OIR    2025250     91400   18.4600 -108.7500      14.2        57       132        60
OIR    2025250     91400   18.4600 -108.7600      14.2        58       130        60
OIR    2025250     91400   18.4600 -108.7700      14.3        58       129        60
OIR    2025250     91400   18.4600 -108.7800      14.3        58       128        60
OIR    2025250     91400   18.4600 -108.7900      14.4        58       127        60
OIR    2025250     91400   18.4600 -108.8000      14.4        58       125        60
OIR    2025250     91400   18.4600 -108.8100      14.4        58       125        60
OIR    2025250     91400   18.4600 -108.8200      14.5        58       124        60
OIR    2025250     91400   18.4600 -108.8300      14.5        58       124        60
OIR    2025250     91400   18.4600 -108.8400      14.5        58       125        60
OIR    2025250     91400   18.4600 -108.8500      14.5        58       125        60
OIR    2025250     91400   18.4600 -108.8600      14.5        58       124        60
OIR    2025250     91400   18.4600 -108.8700      14.5        58       124        60
OIR    2025250     91400   18.4600 -108.8800      14.6        58       123        60
OIR    2025250     91400   18.4600 -108.8900      14.6        58       123        60
OIR    2025250     91400   18.4600 -108.9000      14.6        58       123        60
OIR    2025250     91400   18.4600 -108.9100      14.6        58       122        60
OIR    2025250     91400   18.4600 -108.9200      14.7        58       122        60
OIR    2025250     91400   18.4600 -108.9300      14.7        58       121        60
OIR    2025250     91400   18.4600 -108.9400      14.7        58       120        60
OIR    2025250     91400   18.4600 -108.9500      14.7        58       117        60
OIR    2025250     91400   18.4600 -108.9600      14.8        58       119        60
OIR    2025250     91400   18.4600 -108.9700      14.8        58       120        60
OIR    2025250     91400   18.4600 -108.9800      14.8        58       121        60
OIR    2025250     91400   18.4600 -108.9900      14.8        58       123        60
OIR    2025250     91400   18.4600 -109.0000      14.8        58       125        60
OIR    2025250     91400   18.4600 -109.0100      14.8        58       125        60
OIR    2025250     91400   18.4600 -109.0200      14.8        58       126        60
OIR    2025250     91400   18.4600 -109.0300      14.9        58       126        60
OIR    2025250     91400   18.4600 -109.0400      14.9        58       126        60
OIR    2025250     91400   18.4600 -109.0500      14.9        58       125        60
OIR    2025250     91400   18.4600 -109.0600      14.9        58       124        60
OIR    2025250     91400   18.4600 -109.0700      14.9        58       124        60
OIR    2025250     91400   18.4600 -109.0800      14.9        58       122        60
OIR    2025250     91400   18.4600 -109.0900      14.9        58       120        60
OIR    2025250     91400   18.4600 -109.1000      14.9        58       119        60
OIR    2025250     91400   18.4600 -109.1100      14.9        58       120        60
OIR    2025250     91400   18.4600 -109.1200      14.9        58       121        60
OIR    2025250     91400   18.4600 -109.1300      14.9        58       122        60
OIR    2025250     91400   18.4600 -109.1400      14.9        58       124        60
OIR    2025250     91400   18.4600 -109.1500      14.9        58       127        60
OIR    2025250     91400   18.4600 -109.1600      14.9        58       129        60
OIR    2025250     91400   18.4600 -109.1700      14.9        58       132        60
OIR    2025250     91400   18.4600 -109.1800      14.9        57       137        60
OIR    2025250     91400   18.4600 -109.1900      14.8        57       142        60
OIR    2025250     91400   18.4600 -110.6600      17.4        55       142        60
OIR    2025250     91400   18.4600 -110.6700      17.4        55       140        60
OIR    2025250     91400   18.4600 -110.6800      17.4        55       140        60
OIR    2025250     91400   18.4600 -110.6900      17.4        56       140        60
OIR    2025250     91400   18.4600 -110.7000      17.4        56       138        60
OIR    2025250     91400   18.4600 -110.7100      17.4        56       137        60
OIR    2025250     91400   18.4600 -110.7200      17.4        56       137        60
OIR    2025250     91400   18.4600 -110.7300      17.4        56       138        60
OIR    2025250     91400   18.4600 -110.7400      17.4        56       140        60
OIR    2025250     91400   18.4600 -110.7500      17.4        56       140        60
OIR    2025250     91400   18.4600 -110.7600      17.4        56       140        60
OIR    2025250     91400   18.4600 -110.7700      17.3        56       141        60
OIR    2025250     91400   18.4600 -110.7800      17.3        56       143        60
OIR    2025250     91400   18.4600 -111.3100      12.9        71       141        60
OIR    2025250     91400   18.4600 -111.3200      13.1        71       139        60
OIR    2025250     91400   18.4600 -111.3300      13.4        71       137        60
OIR    2025250     91400   18.4600 -111.3400      13.7        71       134        60
OIR    2025250     91400   18.4600 -111.3500      14.1        73       130        60
OIR    2025250     91400   18.4600 -111.3600      14.1        74       128        60
OIR    2025250     91400   18.4600 -111.3700      14.7        75       129        60
OIR    2025250     91400   18.4600 -111.3800      15.2        75       129        60
OIR    2025250     91400   18.4600 -111.3900      15.5        76       129        60
OIR    2025250     91400   18.4600 -111.4000      15.7        76       129        60
OIR    2025250     91400   18.4600 -111.4100      15.8        76       127        60
OIR    2025250     91400   18.4600 -111.4200      15.9        76       124        60
OIR    2025250     91400   18.4600 -111.4300      16.0        77       121        60
OIR    2025250     91400   18.4600 -111.4400      16.1        77       122        60
OIR    2025250     91400   18.4600 -111.4500      16.1        77       123        60
OIR    2025250     91400   18.4600 -111.4600      16.1        77       122        60
OIR    2025250     91400   18.4600 -111.4700      16.1        77       122        60
OIR    2025250     91400   18.4600 -111.4800      16.1        77       125        60
OIR    2025250     91400   18.4600 -111.4900      16.2        77       129        60
OIR    2025250     91400   18.4600 -111.5000      19.8        82       131        60
OIR    2025250     91400   18.4600 -111.5100      26.3        87       129        60
OIR    2025250     91400   18.4600 -111.5200      25.6        89       128        60
OIR    2025250     91400   18.4600 -111.5300      25.7        91       120        60
OIR    2025250     91400   18.4600 -111.5400      26.7        98       112        60
OIR    2025250     91400   18.4600 -111.5500      26.4       103       109        60
OIR    2025250     91400   18.4600 -111.5600      24.4       111       105        60
OIR    2025250     91400   18.4600 -111.5700      21.6       113       103        60
OIR    2025250     91400   18.4600 -111.5800      20.1       114       103        60
OIR    2025250     91400   18.4600 -111.5900      18.5       114       103        60
OIR    2025250     91400   18.4600 -111.6000      17.6       114       103        60
OIR    2025250     91400   18.4600 -111.6100      16.7       114       103        60
OIR    2025250     91400   18.4600 -111.6200      16.0       114       103        60
OIR    2025250     91400   18.4600 -111.6300      14.7       114       103        60
OIR    2025250     91400   18.4600 -111.6400      12.3       114       103        60
OIR    2025250     91400   18.4600 -111.6500       8.8       119       104        60
OIR    2025250     91400   18.4600 -111.6600       7.2       128       104        60
OIR    2025250     91400   18.4600 -111.6700       5.9       134       115        60
OIR    2025250     91400   18.4600 -111.6800       5.3       136       127        60
OIR    2025250     91400   18.4600 -111.6900       5.0       137       139        60
OIR    2025250     91400   18.4600 -111.8500       4.7        89       141        60
OIR    2025250     91400   18.4600 -111.8600       6.4        78       141        60
OIR    2025250     91400   18.4600 -111.8700       8.1        72       141        60
OIR    2025250     91400   18.4600 -111.8800       8.9        71       142        60
OIR    2025250     91400   18.4600 -112.7300       4.8       118       140        60
OIR    2025250     91400   18.4600 -112.7400       5.2       122       137        60
OIR    2025250     91400   18.4600 -112.7500       5.3       123       137        60
OIR    2025250     91400   18.4600 -112.7600       5.4       124       136        60
OIR    2025250     91400   18.4600 -112.7700       5.4       124       132        60
OIR    2025250     91400   18.4600 -112.7800       5.4       124       129        60
OIR    2025250     91400   18.4600 -112.7900       5.4       124       129        60
OIR    2025250     91400   18.4600 -112.8000       5.4       124       128        60
OIR    2025250     91400   18.4600 -112.8100       5.4       124       128        60
OIR    2025250     91400   18.4600 -112.8200       5.4       124       130        60
OIR    2025250     91400   18.4600 -112.8300       5.4       124       130        60
OIR    2025250     91400   18.4600 -112.8400       5.4       124       129        60
OIR    2025250     91400   18.4600 -112.8500       5.3       124       129        60
OIR    2025250     91400   18.4600 -112.8600       5.3       123       128        60
OIR    2025250     91400   18.4600 -112.8700       5.3       123       128        60
OIR    2025250     91400   18.4600 -112.8800       5.3       123       128        60
OIR    2025250     91400   18.4600 -112.8900       5.3       122       127        60
OIR    2025250     91400   18.4600 -112.9000       5.2       122       127        60
OIR    2025250     91400   18.4600 -112.9100       5.2       122       127        60
OIR    2025250     91400   18.4600 -112.9200       5.2       121       128        60
OIR    2025250     91400   18.4600 -112.9300       5.1       120       129        60
OIR    2025250     91400   18.4600 -112.9400       5.1       119       129        60
OIR    2025250     91400   18.4600 -112.9500       5.0       116       131        60
OIR    2025250     91400   18.4600 -112.9600       4.8       112       132        60
OIR    2025250     91400   18.4600 -112.9700       4.5       105       133        60
OIR    2025250     91400   18.4600 -112.9800       4.0        92       134        60
OIR    2025250     91400   18.4600 -113.3100       4.6       156       143        60
OIR    2025250     91400   18.4600 -113.3200       4.6       153       142        60
OIR    2025250     91400   18.4600 -113.3300       4.6       150       142        60
OIR    2025250     91400   18.4600 -113.3400       4.7       148       140        60
OIR    2025250     91400   18.4600 -113.3500       4.7       143       137        60
OIR    2025250     91400   18.4600 -113.3600       4.8       139       135        60
OIR    2025250     91400   18.4600 -113.3700       4.9       134       131        60
OIR    2025250     91400   18.4600 -113.3800       5.0       129       128        60
OIR    2025250     91400   18.4600 -113.3900       5.1       125       128        60
OIR    2025250     91400   18.4600 -113.4000       5.1       123       128        60
OIR    2025250     91400   18.4600 -113.4100       5.1       121       127        60
OIR    2025250     91400   18.4600 -113.4200       5.0       117       125        60
OIR    2025250     91400   18.4600 -113.4300       4.7       110       125        60
OIR    2025250     91400   18.4600 -113.4400       4.5       104       127        60
OIR    2025250     91400   18.4600 -113.4500       4.1        99       129        60
OIR    2025250     91400   18.4600 -113.7600       8.0       202       140        60
OIR    2025250     91400   18.4600 -113.7700       8.0       201       136        60
OIR    2025250     91400   18.4600 -113.7800       8.0       200       136        60
OIR    2025250     91400   18.4600 -113.7900       7.9       199       135        60
OIR    2025250     91400   18.4600 -113.8000       7.9       199       135        60
OIR    2025250     91400   18.4600 -113.8100       7.9       198       134        60
OIR    2025250     91400   18.4600 -113.8200       7.9       198       134        60
OIR    2025250     91400   18.4600 -113.8300       7.9       198       133        60
OIR    2025250     91400   18.4600 -113.8400       7.8       198       132        60
OIR    2025250     91400   18.4600 -113.8500       7.8       198       133        60
OIR    2025250     91400   18.4600 -113.8600       7.8       198       134        60
OIR    2025250     91400   18.4600 -113.8700       7.8       197       139        60
OIR    2025250     91400   18.4600 -113.9200       7.2       175       137        60
OIR    2025250     91400   18.4600 -113.9300       7.0       173       133        60
OIR    2025250     91400   18.4600 -113.9400       7.3       171       135        60
OIR    2025250     91400   18.4600 -113.9500       7.4       172       136        60
OIR    2025250     91400   18.4600 -114.0900      10.3       182       142        60
OIR    2025250     91400   18.4600 -114.1000      10.6       182       142        60
OIR    2025250     91400   18.4600 -114.1400      11.6       181       142        60
OIR    2025250     91400   18.4600 -114.1500      11.7       181       139        60
OIR    2025250     91400   18.4600 -114.1600      11.7       182       139        60
OIR    2025250     91400   18.4600 -114.1700      11.8       182       139        60
OIR    2025250     91400   18.4600 -114.1800      11.8       182       140        60
OIR    2025250     91400   18.4600 -114.1900      11.8       182       138        60
OIR    2025250     91400   18.4600 -114.2000      11.8       182       136        60
OIR    2025250     91400   18.4600 -114.2100      11.7       182       138        60
OIR    2025250     91400   18.4600 -114.2200      11.7       182       140        60
OIR    2025250     91400   18.4600 -114.2300      11.9       184       141        60
OIR    2025250     91400   18.4600 -114.2400      12.3       187       142        60
OIR    2025250     91400   18.4600 -114.2500      12.5       189       142        60
OIR    2025250     91400   18.4600 -114.2600      12.4       192       142        60
OIR    2025250     91400   18.4600 -114.2700      12.1       195       142        60
OIR    2025250     91400   18.4600 -114.2800      12.0       197       141        60
OIR    2025250     91400   18.4600 -114.2900      11.9       199       140        60
OIR    2025250     91400   18.4600 -114.3000      11.9       200       138        60
OIR    2025250     91400   18.4600 -114.3100      11.9       201       136        60
OIR    2025250     91400   18.4600 -114.3200      12.1       202       139        60
OIR    2025250     91400   18.4600 -114.4100      11.7       208       142        60
OIR    2025250     91400   18.4600 -114.4200      11.6       208       141        60
OIR    2025250     91400   18.4600 -114.4300      11.5       208       140        60
OIR    2025250     91400   18.4600 -114.4400      11.4       208       138        60
OIR    2025250     91400   18.4600 -114.4500      11.4       208       138        60
OIR    2025250     91400   18.4600 -114.4600      11.3       208       141        60
OIR    2025250     91400   18.4500 -108.6900      13.9        53       141        60
OIR    2025250     91400   18.4500 -108.7000      13.9        53       135        60
OIR    2025250     91400   18.4500 -108.7100      14.0        52       130        60
OIR    2025250     91400   18.4500 -108.7200      14.0        53       130        60
OIR    2025250     91400   18.4500 -108.7300      14.0        53       130        60
OIR    2025250     91400   18.4500 -108.7400      14.1        54       130        60
OIR    2025250     91400   18.4500 -108.7500      14.2        56       128        60
OIR    2025250     91400   18.4500 -108.7600      14.3        57       127        60
OIR    2025250     91400   18.4500 -108.7700      14.3        58       126        60
OIR    2025250     91400   18.4500 -108.7800      14.4        58       125        60
OIR    2025250     91400   18.4500 -108.7900      14.4        58       124        60
OIR    2025250     91400   18.4500 -108.8000      14.4        58       123        60
OIR    2025250     91400   18.4500 -108.8100      14.4        58       122        60
OIR    2025250     91400   18.4500 -108.8200      14.5        58       123        60
OIR    2025250     91400   18.4500 -108.8300      14.5        58       123        60
OIR    2025250     91400   18.4500 -108.8400      14.5        58       123        60
OIR    2025250     91400   18.4500 -108.8500      14.5        58       123        60
OIR    2025250     91400   18.4500 -108.8600      14.5        58       123        60
OIR    2025250     91400   18.4500 -108.8700      14.5        58       122        60
OIR    2025250     91400   18.4500 -108.8800      14.6        58       121        60
OIR    2025250     91400   18.4500 -108.8900      14.6        58       121        60
OIR    2025250     91400   18.4500 -108.9000      14.6        58       121        60
OIR    2025250     91400   18.4500 -108.9100      14.6        58       121        60
OIR    2025250     91400   18.4500 -108.9200      14.6        58       121        60
OIR    2025250     91400   18.4500 -108.9300      14.7        58       121        60
OIR    2025250     91400   18.4500 -108.9400      14.7        58       121        60
OIR    2025250     91400   18.4500 -108.9500      14.7        58       120        60
OIR    2025250     91400   18.4500 -108.9600      14.7        58       119        60
OIR    2025250     91400   18.4500 -108.9700      14.7        58       119        60
OIR    2025250     91400   18.4500 -108.9800      14.8        58       120        60
OIR    2025250     91400   18.4500 -108.9900      14.8        58       121        60
OIR    2025250     91400   18.4500 -109.0000      14.8        58       122        60
OIR    2025250     91400   18.4500 -109.0100      14.8        58       123        60
OIR    2025250     91400   18.4500 -109.0200      14.8        58       124        60
OIR    2025250     91400   18.4500 -109.0300      14.8        58       124        60
OIR    2025250     91400   18.4500 -109.0400      14.9        58       123        60
OIR    2025250     91400   18.4500 -109.0500      14.9        58       123        60
OIR    2025250     91400   18.4500 -109.0600      14.9        58       122        60
OIR    2025250     91400   18.4500 -109.0700      14.9        58       121        60
OIR    2025250     91400   18.4500 -109.0800      14.9        58       120        60
OIR    2025250     91400   18.4500 -109.0900      14.9        58       119        60
OIR    2025250     91400   18.4500 -109.1000      14.9        58       117        60
OIR    2025250     91400   18.4500 -109.1100      14.9        58       116        60
OIR    2025250     91400   18.4500 -109.1200      14.9        58       116        60
OIR    2025250     91400   18.4500 -109.1300      14.9        58       117        60
OIR    2025250     91400   18.4500 -109.1400      14.9        58       119        60
OIR    2025250     91400   18.4500 -109.1500      14.9        58       121        60
OIR    2025250     91400   18.4500 -109.1600      14.9        58       124        60
OIR    2025250     91400   18.4500 -109.1700      14.9        58       127        60
OIR    2025250     91400   18.4500 -109.1800      14.9        58       130        60
OIR    2025250     91400   18.4500 -109.1900      14.8        57       135        60
OIR    2025250     91400   18.4500 -109.2000      14.8        57       140        60
OIR    2025250     91400   18.4500 -110.6800      17.4        55       142        60
OIR    2025250     91400   18.4500 -110.6900      17.4        56       140        60
OIR    2025250     91400   18.4500 -110.7000      17.4        56       139        60
OIR    2025250     91400   18.4500 -110.7100      17.4        56       138        60
OIR    2025250     91400   18.4500 -110.7200      17.4        56       138        60
OIR    2025250     91400   18.4500 -110.7300      17.4        56       138        60
OIR    2025250     91400   18.4500 -110.7400      17.4        56       139        60
OIR    2025250     91400   18.4500 -110.7500      17.4        56       139        60
OIR    2025250     91400   18.4500 -110.7600      17.3        56       140        60
OIR    2025250     91400   18.4500 -110.7700      17.3        56       141        60
OIR    2025250     91400   18.4500 -110.7800      17.3        56       143        60
OIR    2025250     91400   18.4500 -111.3000      12.8        71       143        60
OIR    2025250     91400   18.4500 -111.3100      12.8        71       141        60
OIR    2025250     91400   18.4500 -111.3200      12.9        71       139        60
OIR    2025250     91400   18.4500 -111.3300      13.0        71       137        60
OIR    2025250     91400   18.4500 -111.3400      13.0        71       134        60
OIR    2025250     91400   18.4500 -111.3500      13.1        72       131        60
OIR    2025250     91400   18.4500 -111.3600      13.0        73       128        60
OIR    2025250     91400   18.4500 -111.3700      13.4        73       128        60
OIR    2025250     91400   18.4500 -111.3800      14.2        74       128        60
OIR    2025250     91400   18.4500 -111.3900      14.7        75       129        60
OIR    2025250     91400   18.4500 -111.4000      15.2        75       129        60
OIR    2025250     91400   18.4500 -111.4100      15.5        76       127        60
OIR    2025250     91400   18.4500 -111.4200      15.7        76       124        60
OIR    2025250     91400   18.4500 -111.4300      15.9        76       120        60
OIR    2025250     91400   18.4500 -111.4400      16.0        76       124        60
OIR    2025250     91400   18.4500 -111.4500      16.0        76       127        60
OIR    2025250     91400   18.4500 -111.4600      16.0        76       126        60
OIR    2025250     91400   18.4500 -111.4700      16.0        76       124        60
OIR    2025250     91400   18.4500 -111.4800      15.9        76       124        60
OIR    2025250     91400   18.4500 -111.4900      16.0        76       125        60
OIR    2025250     91400   18.4500 -111.5000      19.9        79       127        60
OIR    2025250     91400   18.4500 -111.5100      25.6        82       128        60
OIR    2025250     91400   18.4500 -111.5200      23.5        83       129        60
OIR    2025250     91400   18.4500 -111.5300      24.8        87       121        60
OIR    2025250     91400   18.4500 -111.5400      25.9        92       110        60
OIR    2025250     91400   18.4500 -111.5500      25.7        97       104        60
OIR    2025250     91400   18.4500 -111.5600      24.6       103       104        60
OIR    2025250     91400   18.4500 -111.5700      21.1       112       103        60
OIR    2025250     91400   18.4500 -111.5800      19.2       112       103        60
OIR    2025250     91400   18.4500 -111.5900      18.0       111       103        60
OIR    2025250     91400   18.4500 -111.6000      16.9       111       103        60
OIR    2025250     91400   18.4500 -111.6100      16.2       111       103        60
OIR    2025250     91400   18.4500 -111.6200      15.5       112       103        60
OIR    2025250     91400   18.4500 -111.6300      13.6       114       103        60
OIR    2025250     91400   18.4500 -111.6400      11.6       116       103        60
OIR    2025250     91400   18.4500 -111.6500       9.7       120       104        60
OIR    2025250     91400   18.4500 -111.6600       7.9       131       104        60
OIR    2025250     91400   18.4500 -111.6700       7.4       135       112        60
OIR    2025250     91400   18.4500 -111.6800       5.8       135       124        60
OIR    2025250     91400   18.4500 -111.6900       6.9       121       135        60
OIR    2025250     91400   18.4500 -111.8500       4.3        95       140        60
OIR    2025250     91400   18.4500 -111.8600       6.1        82       141        60
OIR    2025250     91400   18.4500 -111.8700       8.0        76       142        60
OIR    2025250     91400   18.4500 -112.7300       5.0       121       140        60
OIR    2025250     91400   18.4500 -112.7400       5.3       123       137        60
OIR    2025250     91400   18.4500 -112.7500       5.3       124       135        60
OIR    2025250     91400   18.4500 -112.7600       5.4       124       133        60
OIR    2025250     91400   18.4500 -112.7700       5.4       124       131        60
OIR    2025250     91400   18.4500 -112.7800       5.4       124       128        60
OIR    2025250     91400   18.4500 -112.7900       5.4       124       127        60
OIR    2025250     91400   18.4500 -112.8000       5.4       124       127        60
OIR    2025250     91400   18.4500 -112.8100       5.4       124       127        60
OIR    2025250     91400   18.4500 -112.8200       5.4       124       127        60
OIR    2025250     91400   18.4500 -112.8300       5.4       124       128        60
OIR    2025250     91400   18.4500 -112.8400       5.4       124       128        60
OIR    2025250     91400   18.4500 -112.8500       5.4       124       128        60
OIR    2025250     91400   18.4500 -112.8600       5.3       123       127        60
OIR    2025250     91400   18.4500 -112.8700       5.3       123       127        60
OIR    2025250     91400   18.4500 -112.8800       5.3       123       127        60
OIR    2025250     91400   18.4500 -112.8900       5.3       122       127        60
OIR    2025250     91400   18.4500 -112.9000       5.3       122       127        60
OIR    2025250     91400   18.4500 -112.9100       5.3       122       127        60
OIR    2025250     91400   18.4500 -112.9200       5.2       120       127        60
OIR    2025250     91400   18.4500 -112.9300       5.2       119       128        60
OIR    2025250     91400   18.4500 -112.9400       5.2       117       129        60
OIR    2025250     91400   18.4500 -112.9500       5.1       114       130        60
OIR    2025250     91400   18.4500 -112.9600       5.0       110       131        60
OIR    2025250     91400   18.4500 -112.9700       4.7       103       132        60
OIR    2025250     91400   18.4500 -112.9800       4.3        92       132        60
OIR    2025250     91400   18.4500 -112.9900       4.2        84       134        60
OIR    2025250     91400   18.4500 -113.0000       4.1        78       140        60
OIR    2025250     91400   18.4500 -113.0600       5.0       336       142        60
OIR    2025250     91400   18.4500 -113.3100       4.4       154       143        60
OIR    2025250     91400   18.4500 -113.3400       4.5       145       143        60
OIR    2025250     91400   18.4500 -113.3500       4.6       141       138        60
OIR    2025250     91400   18.4500 -113.3600       4.7       137       134        60
OIR    2025250     91400   18.4500 -113.3700       4.8       132       130        60
OIR    2025250     91400   18.4500 -113.3800       5.0       127       127        60
OIR    2025250     91400   18.4500 -113.3900       5.0       124       129        60
OIR    2025250     91400   18.4500 -113.4000       5.1       122       130        60
OIR    2025250     91400   18.4500 -113.4100       5.1       121       129        60
OIR    2025250     91400   18.4500 -113.4200       5.1       118       127        60
OIR    2025250     91400   18.4500 -113.4300       5.0       114       126        60
OIR    2025250     91400   18.4500 -113.4400       4.9       110       127        60
OIR    2025250     91400   18.4500 -113.4500       4.7       106       129        60
OIR    2025250     91400   18.4500 -113.4600       4.4       104       130        60
OIR    2025250     91400   18.4500 -113.7600       8.0       201       140        60
OIR    2025250     91400   18.4500 -113.7700       8.1       200       135        60
OIR    2025250     91400   18.4500 -113.7800       8.0       199       135        60
OIR    2025250     91400   18.4500 -113.7900       7.9       199       135        60
OIR    2025250     91400   18.4500 -113.8000       7.9       198       136        60
OIR    2025250     91400   18.4500 -113.8100       7.9       198       136        60
OIR    2025250     91400   18.4500 -113.8200       7.9       198       136        60
OIR    2025250     91400   18.4500 -113.8300       7.8       198       135        60
OIR    2025250     91400   18.4500 -113.8400       7.8       198       135        60
OIR    2025250     91400   18.4500 -113.8500       7.8       197       135        60
OIR    2025250     91400   18.4500 -113.8600       7.8       197       136        60
OIR    2025250     91400   18.4500 -113.8700       7.7       196       141        60
OIR    2025250     91400   18.4500 -113.9100       6.6       170       140        60
OIR    2025250     91400   18.4500 -113.9200       6.4       164       137        60
OIR    2025250     91400   18.4500 -113.9300       6.2       161       133        60
OIR    2025250     91400   18.4500 -113.9400       6.3       162       135        60
OIR    2025250     91400   18.4500 -113.9500       6.7       167       137        60
OIR    2025250     91400   18.4500 -113.9600       7.6       169       143        60
OIR    2025250     91400   18.4500 -114.1100      11.0       181       141        60
OIR    2025250     91400   18.4500 -114.1600      11.8       182       141        60
OIR    2025250     91400   18.4500 -114.1700      11.8       182       138        60
OIR    2025250     91400   18.4500 -114.1800      11.8       182       136        60
OIR    2025250     91400   18.4500 -114.1900      11.8       182       135        60
OIR    2025250     91400   18.4500 -114.2000      11.7       182       134        60
OIR    2025250     91400   18.4500 -114.2100      11.7       182       135        60
OIR    2025250     91400   18.4500 -114.2200      11.7       182       138        60
OIR    2025250     91400   18.4500 -114.2300      11.5       183       141        60
OIR    2025250     91400   18.4500 -114.2900      11.8       200       142        60
OIR    2025250     91400   18.4500 -114.3000      11.9       201       141        60
OIR    2025250     91400   18.4500 -114.3100      11.9       202       140        60
OIR    2025250     91400   18.4500 -114.3200      12.1       202       141        60
OIR    2025250     91400   18.4500 -114.4200      11.6       209       141        60
OIR    2025250     91400   18.4500 -114.4300      11.5       209       139        60
OIR    2025250     91400   18.4500 -114.4400      11.4       209       139        60
OIR    2025250     91400   18.4500 -114.4500      11.3       209       139        60
OIR    2025250     91400   18.4500 -114.4600      11.2       209       142        60
OIR    2025250     91400   18.4400 -108.6900      14.0        53       141        60
OIR    2025250     91400   18.4400 -108.7000      14.0        53       135        60
OIR    2025250     91400   18.4400 -108.7100      14.0        53       129        60
OIR    2025250     91400   18.4400 -108.7200      14.0        53       129        60
OIR    2025250     91400   18.4400 -108.7300      14.0        53       128        60
OIR    2025250     91400   18.4400 -108.7400      14.1        54       127        60
OIR    2025250     91400   18.4400 -108.7500      14.2        56       126        60
OIR    2025250     91400   18.4400 -108.7600      14.3        57       124        60
OIR    2025250     91400   18.4400 -108.7700      14.4        58       124        60
OIR    2025250     91400   18.4400 -108.7800      14.4        58       123        60
OIR    2025250     91400   18.4400 -108.7900      14.4        58       122        60
OIR    2025250     91400   18.4400 -108.8000      14.4        58       121        60
OIR    2025250     91400   18.4400 -108.8100      14.4        58       120        60
OIR    2025250     91400   18.4400 -108.8200      14.5        58       121        60
OIR    2025250     91400   18.4400 -108.8300      14.5        58       122        60
OIR    2025250     91400   18.4400 -108.8400      14.5        58       122        60
OIR    2025250     91400   18.4400 -108.8500      14.5        58       122        60
OIR    2025250     91400   18.4400 -108.8600      14.5        58       122        60
OIR    2025250     91400   18.4400 -108.8700      14.5        58       121        60
OIR    2025250     91400   18.4400 -108.8800      14.6        58       120        60
OIR    2025250     91400   18.4400 -108.8900      14.6        58       120        60
OIR    2025250     91400   18.4400 -108.9000      14.6        58       120        60
OIR    2025250     91400   18.4400 -108.9100      14.6        58       120        60
OIR    2025250     91400   18.4400 -108.9200      14.6        58       121        60
OIR    2025250     91400   18.4400 -108.9300      14.6        58       121        60
OIR    2025250     91400   18.4400 -108.9400      14.7        58       121        60
OIR    2025250     91400   18.4400 -108.9500      14.7        58       121        60
OIR    2025250     91400   18.4400 -108.9600      14.7        58       120        60
OIR    2025250     91400   18.4400 -108.9700      14.7        58       120        60
OIR    2025250     91400   18.4400 -108.9800      14.7        58       119        60
OIR    2025250     91400   18.4400 -108.9900      14.8        58       119        60
OIR    2025250     91400   18.4400 -109.0000      14.8        58       120        60
OIR    2025250     91400   18.4400 -109.0100      14.8        58       120        60
OIR    2025250     91400   18.4400 -109.0200      14.8        58       121        60
OIR    2025250     91400   18.4400 -109.0300      14.8        58       122        60
OIR    2025250     91400   18.4400 -109.0400      14.9        58       121        60
OIR    2025250     91400   18.4400 -109.0500      14.9        58       120        60
OIR    2025250     91400   18.4400 -109.0600      14.9        58       117        60
OIR    2025250     91400   18.4400 -109.0700      14.9        58       116        60
OIR    2025250     91400   18.4400 -109.0800      14.9        58       116        60
OIR    2025250     91400   18.4400 -109.0900      14.9        58       116        60
OIR    2025250     91400   18.4400 -109.1000      14.9        58       116        60
OIR    2025250     91400   18.4400 -109.1100      14.9        58       116        60
OIR    2025250     91400   18.4400 -109.1200      14.9        58       116        60
OIR    2025250     91400   18.4400 -109.1300      14.9        58       115        60
OIR    2025250     91400   18.4400 -109.1400      14.9        58       116        60
OIR    2025250     91400   18.4400 -109.1500      14.9        58       119        60
OIR    2025250     91400   18.4400 -109.1600      14.9        58       122        60
OIR    2025250     91400   18.4400 -109.1700      14.9        58       124        60
OIR    2025250     91400   18.4400 -109.1800      14.9        58       126        60
OIR    2025250     91400   18.4400 -109.1900      14.9        58       129        60
OIR    2025250     91400   18.4400 -109.2000      14.8        58       131        60
OIR    2025250     91400   18.4400 -109.2100      14.6        57       135        60
OIR    2025250     91400   18.4400 -109.2200      13.6        57       139        60
OIR    2025250     91400   18.4400 -110.6900      17.3        55       142        60
OIR    2025250     91400   18.4400 -110.7000      17.3        56       141        60
OIR    2025250     91400   18.4400 -110.7100      17.3        56       140        60
OIR    2025250     91400   18.4400 -110.7200      17.3        56       139        60
OIR    2025250     91400   18.4400 -110.7300      17.3        56       139        60
OIR    2025250     91400   18.4400 -110.7400      17.3        56       139        60
OIR    2025250     91400   18.4400 -110.7500      17.3        56       139        60
OIR    2025250     91400   18.4400 -110.7600      17.3        56       141        60
OIR    2025250     91400   18.4400 -110.7700      17.3        56       142        60
OIR    2025250     91400   18.4400 -110.7800      17.3        56       142        60
OIR    2025250     91400   18.4400 -111.3000      12.8        71       142        60
OIR    2025250     91400   18.4400 -111.3100      12.8        71       140        60
OIR    2025250     91400   18.4400 -111.3200      12.8        71       139        60
OIR    2025250     91400   18.4400 -111.3300      12.8        71       138        60
OIR    2025250     91400   18.4400 -111.3400      12.7        71       136        60
OIR    2025250     91400   18.4400 -111.3500      12.7        72       133        60
OIR    2025250     91400   18.4400 -111.3600      12.8        72       130        60
OIR    2025250     91400   18.4400 -111.3700      12.8        72       129        60
OIR    2025250     91400   18.4400 -111.3800      13.2        73       128        60
OIR    2025250     91400   18.4400 -111.3900      13.8        74       128        60
OIR    2025250     91400   18.4400 -111.4000      14.4        75       129        60
OIR    2025250     91400   18.4400 -111.4100      15.0        75       127        60
OIR    2025250     91400   18.4400 -111.4200      15.4        76       124        60
OIR    2025250     91400   18.4400 -111.4300      15.7        76       121        60
OIR    2025250     91400   18.4400 -111.4400      15.8        76       124        60
OIR    2025250     91400   18.4400 -111.4500      15.9        76       129        60
OIR    2025250     91400   18.4400 -111.4600      15.9        76       129        60
OIR    2025250     91400   18.4400 -111.4700      15.8        75       126        60
OIR    2025250     91400   18.4400 -111.4800      15.5        75       123        60
OIR    2025250     91400   18.4400 -111.4900      15.6        74       123        60
OIR    2025250     91400   18.4400 -111.5000      18.6        76       123        60
OIR    2025250     91400   18.4400 -111.5100      24.5        78       125        60
OIR    2025250     91400   18.4400 -111.5200      22.3        78       128        60
OIR    2025250     91400   18.4400 -111.5300      22.0        79       124        60
OIR    2025250     91400   18.4400 -111.5400      23.1        82       112        60
OIR    2025250     91400   18.4400 -111.5500      22.8        89       103        60
OIR    2025250     91400   18.4400 -111.5600      22.2        91       103        60
OIR    2025250     91400   18.4400 -111.5700      20.3        96       103        60
OIR    2025250     91400   18.4400 -111.5800      18.2       105       103        60
OIR    2025250     91400   18.4400 -111.5900      17.2       108       103        60
OIR    2025250     91400   18.4400 -111.6000      16.4       108       103        60
OIR    2025250     91400   18.4400 -111.6100      15.8       109       103        60
OIR    2025250     91400   18.4400 -111.6200      14.9       110       103        60
OIR    2025250     91400   18.4400 -111.6300      13.3       113       103        60
OIR    2025250     91400   18.4400 -111.6400      11.2       116       103        60
OIR    2025250     91400   18.4400 -111.6500      10.5       119       104        60
OIR    2025250     91400   18.4400 -111.6600      10.0       126       105        60
OIR    2025250     91400   18.4400 -111.6700       8.2       131       111        60
OIR    2025250     91400   18.4400 -111.6800       6.7       133       124        60
OIR    2025250     91400   18.4400 -111.6900       9.4       118       136        60
OIR    2025250     91400   18.4400 -111.8500       4.0       101       140        60
OIR    2025250     91400   18.4400 -111.8600       6.1        86       141        60
OIR    2025250     91400   18.4400 -111.8700       8.0        79       141        60
OIR    2025250     91400   18.4400 -111.8800       8.9        77       142        60
OIR    2025250     91400   18.4400 -112.7100       4.4       114       141        60
OIR    2025250     91400   18.4400 -112.7200       4.8       119       139        60
OIR    2025250     91400   18.4400 -112.7300       5.1       122       138        60
OIR    2025250     91400   18.4400 -112.7400       5.3       124       137        60
OIR    2025250     91400   18.4400 -112.7500       5.3       124       133        60
OIR    2025250     91400   18.4400 -112.7600       5.4       124       130        60
OIR    2025250     91400   18.4400 -112.7700       5.4       124       128        60
OIR    2025250     91400   18.4400 -112.7800       5.4       124       127        60
OIR    2025250     91400   18.4400 -112.7900       5.4       124       126        60
OIR    2025250     91400   18.4400 -112.8000       5.4       124       126        60
OIR    2025250     91400   18.4400 -112.8100       5.4       124       125        60
OIR    2025250     91400   18.4400 -112.8200       5.4       124       126        60
OIR    2025250     91400   18.4400 -112.8300       5.4       124       126        60
OIR    2025250     91400   18.4400 -112.8400       5.4       124       126        60
OIR    2025250     91400   18.4400 -112.8500       5.4       124       127        60
OIR    2025250     91400   18.4400 -112.8600       5.4       123       127        60
OIR    2025250     91400   18.4400 -112.8700       5.4       123       127        60
OIR    2025250     91400   18.4400 -112.8800       5.3       123       127        60
OIR    2025250     91400   18.4400 -112.8900       5.3       123       127        60
OIR    2025250     91400   18.4400 -112.9000       5.3       122       127        60
OIR    2025250     91400   18.4400 -112.9100       5.3       122       127        60
OIR    2025250     91400   18.4400 -112.9200       5.3       120       127        60
OIR    2025250     91400   18.4400 -112.9300       5.3       119       127        60
OIR    2025250     91400   18.4400 -112.9400       5.3       116       128        60
OIR    2025250     91400   18.4400 -112.9500       5.2       113       129        60
OIR    2025250     91400   18.4400 -112.9600       5.2       110       130        60
OIR    2025250     91400   18.4400 -112.9700       5.1       105       131        60
OIR    2025250     91400   18.4400 -112.9800       4.8        96       132        60
OIR    2025250     91400   18.4400 -112.9900       4.6        86       132        60
OIR    2025250     91400   18.4400 -113.0000       4.4        81       138        60
OIR    2025250     91400   18.4400 -113.0600       5.3       343       140        60
OIR    2025250     91400   18.4400 -113.0700       5.3       341       140        60
OIR    2025250     91400   18.4400 -113.0800       5.0       339       140        60
OIR    2025250     91400   18.4400 -113.3500       4.5       136       139        60
OIR    2025250     91400   18.4400 -113.3600       4.6       132       133        60
OIR    2025250     91400   18.4400 -113.3700       4.8       127       130        60
OIR    2025250     91400   18.4400 -113.3800       5.0       123       128        60
OIR    2025250     91400   18.4400 -113.3900       5.0       121       130        60
OIR    2025250     91400   18.4400 -113.4000       5.1       121       133        60
OIR    2025250     91400   18.4400 -113.4100       5.2       119       133        60
OIR    2025250     91400   18.4400 -113.4200       5.3       117       129        60
OIR    2025250     91400   18.4400 -113.4300       5.3       114       127        60
OIR    2025250     91400   18.4400 -113.4400       5.2       110       128        60
OIR    2025250     91400   18.4400 -113.4500       5.2       107       129        60
OIR    2025250     91400   18.4400 -113.4600       5.0       103       131        60
OIR    2025250     91400   18.4400 -113.4700       4.7        98       133        60
OIR    2025250     91400   18.4400 -113.4800       4.0        93       133        60
OIR    2025250     91400   18.4400 -113.7900       7.4       198       142        60
OIR    2025250     91400   18.4400 -113.8000       7.5       198       142        60
OIR    2025250     91400   18.4400 -113.9100       6.0       162       141        60
OIR    2025250     91400   18.4400 -113.9200       5.8       158       138        60
OIR    2025250     91400   18.4400 -113.9300       5.8       157       135        60
OIR    2025250     91400   18.4400 -113.9400       5.9       157       137        60
OIR    2025250     91400   18.4400 -113.9500       6.3       159       140        60
OIR    2025250     91400   18.4400 -114.1100      11.1       181       143        60
OIR    2025250     91400   18.4400 -114.1700      11.8       182       138        60
OIR    2025250     91400   18.4400 -114.1800      11.8       182       133        60
OIR    2025250     91400   18.4400 -114.1900      11.7       183       131        60
OIR    2025250     91400   18.4400 -114.2000      11.6       183       131        60
OIR    2025250     91400   18.4400 -114.2100      11.4       183       132        60
OIR    2025250     91400   18.4400 -114.2200      10.9       182       136        60
OIR    2025250     91400   18.4400 -114.2300      10.5       183       141        60
OIR    2025250     91400   18.4400 -114.4500      11.2       209       143        60
OIR    2025250     91400   18.4300 -108.6900      14.0        53       140        60
OIR    2025250     91400   18.4300 -108.7000      14.0        53       135        60
OIR    2025250     91400   18.4300 -108.7100      14.0        53       130        60
OIR    2025250     91400   18.4300 -108.7200      14.0        53       128        60
OIR    2025250     91400   18.4300 -108.7300      14.1        53       126        60
OIR    2025250     91400   18.4300 -108.7400      14.1        54       125        60
OIR    2025250     91400   18.4300 -108.7500      14.2        55       123        60
OIR    2025250     91400   18.4300 -108.7600      14.3        57       122        60
OIR    2025250     91400   18.4300 -108.7700      14.4        57       121        60
OIR    2025250     91400   18.4300 -108.7800      14.4        58       121        60
OIR    2025250     91400   18.4300 -108.7900      14.4        58       120        60
OIR    2025250     91400   18.4300 -108.8000      14.4        58       120        60
OIR    2025250     91400   18.4300 -108.8100      14.5        58       119        60
OIR    2025250     91400   18.4300 -108.8200      14.5        58       119        60
OIR    2025250     91400   18.4300 -108.8300      14.5        58       120        60
OIR    2025250     91400   18.4300 -108.8400      14.5        58       121        60
OIR    2025250     91400   18.4300 -108.8500      14.5        58       121        60
OIR    2025250     91400   18.4300 -108.8600      14.5        58       121        60
OIR    2025250     91400   18.4300 -108.8700      14.5        58       120        60
OIR    2025250     91400   18.4300 -108.8800      14.5        58       120        60
OIR    2025250     91400   18.4300 -108.8900      14.6        58       120        60
OIR    2025250     91400   18.4300 -108.9000      14.6        58       120        60
OIR    2025250     91400   18.4300 -108.9100      14.6        58       120        60
OIR    2025250     91400   18.4300 -108.9200      14.6        58       120        60
OIR    2025250     91400   18.4300 -108.9300      14.6        58       120        60
OIR    2025250     91400   18.4300 -108.9400      14.6        58       121        60
OIR    2025250     91400   18.4300 -108.9500      14.7        58       120        60
OIR    2025250     91400   18.4300 -108.9600      14.7        58       120        60
OIR    2025250     91400   18.4300 -108.9700      14.7        58       120        60
OIR    2025250     91400   18.4300 -108.9800      14.7        58       120        60
OIR    2025250     91400   18.4300 -108.9900      14.7        58       120        60
OIR    2025250     91400   18.4300 -109.0000      14.8        58       120        60
OIR    2025250     91400   18.4300 -109.0100      14.8        58       120        60
OIR    2025250     91400   18.4300 -109.0200      14.8        58       119        60
OIR    2025250     91400   18.4300 -109.0300      14.8        58       119        60
OIR    2025250     91400   18.4300 -109.0400      14.8        58       119        60
OIR    2025250     91400   18.4300 -109.0500      14.9        58       116        60
OIR    2025250     91400   18.4300 -109.0600      14.9        58       116        60
OIR    2025250     91400   18.4300 -109.0700      14.9        58       115        60
OIR    2025250     91400   18.4300 -109.0800      14.9        58       114        60
OIR    2025250     91400   18.4300 -109.0900      14.9        58       115        60
OIR    2025250     91400   18.4300 -109.1000      14.9        58       116        60
OIR    2025250     91400   18.4300 -109.1100      14.9        58       115        60
OIR    2025250     91400   18.4300 -109.1200      14.9        58       114        60
OIR    2025250     91400   18.4300 -109.1300      14.9        58       113        60
OIR    2025250     91400   18.4300 -109.1400      14.9        58       114        60
OIR    2025250     91400   18.4300 -109.1500      14.9        58       116        60
OIR    2025250     91400   18.4300 -109.1600      14.9        58       117        60
OIR    2025250     91400   18.4300 -109.1700      14.9        58       120        60
OIR    2025250     91400   18.4300 -109.1800      14.9        58       122        60
OIR    2025250     91400   18.4300 -109.1900      14.9        58       124        60
OIR    2025250     91400   18.4300 -109.2000      14.8        58       125        60
OIR    2025250     91400   18.4300 -109.2100      14.6        58       127        60
OIR    2025250     91400   18.4300 -109.2200      14.0        57       130        60
OIR    2025250     91400   18.4300 -109.2300      13.7        57       133        60
OIR    2025250     91400   18.4300 -109.2400      13.9        56       137        60
OIR    2025250     91400   18.4300 -109.2500      14.3        55       140        60
OIR    2025250     91400   18.4300 -110.7200      17.3        56       142        60
OIR    2025250     91400   18.4300 -110.7300      17.3        56       141        60
OIR    2025250     91400   18.4300 -110.7400      17.3        56       141        60
OIR    2025250     91400   18.4300 -110.7500      17.3        56       141        60
OIR    2025250     91400   18.4300 -110.7600      17.3        56       141        60
OIR    2025250     91400   18.4300 -110.7700      17.3        56       142        60
OIR    2025250     91400   18.4300 -110.7800      17.3        56       143        60
OIR    2025250     91400   18.4300 -111.2700      12.7        70       143        60
OIR    2025250     91400   18.4300 -111.2800      12.7        70       142        60
OIR    2025250     91400   18.4300 -111.2900      12.7        70       142        60
OIR    2025250     91400   18.4300 -111.3000      12.7        71       141        60
OIR    2025250     91400   18.4300 -111.3100      12.7        71       139        60
OIR    2025250     91400   18.4300 -111.3200      12.7        71       138        60
OIR    2025250     91400   18.4300 -111.3300      12.7        71       139        60
OIR    2025250     91400   18.4300 -111.3400      12.7        71       139        60
OIR    2025250     91400   18.4300 -111.3500      12.7        71       136        60
OIR    2025250     91400   18.4300 -111.3600      12.7        72       133        60
OIR    2025250     91400   18.4300 -111.3700      12.7        72       131        60
OIR    2025250     91400   18.4300 -111.3800      12.8        72       130        60
OIR    2025250     91400   18.4300 -111.3900      13.3        73       129        60
OIR    2025250     91400   18.4300 -111.4000      13.7        74       129        60
OIR    2025250     91400   18.4300 -111.4100      14.2        75       128        60
OIR    2025250     91400   18.4300 -111.4200      14.9        75       127        60
OIR    2025250     91400   18.4300 -111.4300      15.4        76       126        60
OIR    2025250     91400   18.4300 -111.4400      15.6        76       127        60
OIR    2025250     91400   18.4300 -111.4500      15.7        76       129        60
OIR    2025250     91400   18.4300 -111.4600      15.6        75       130        60
OIR    2025250     91400   18.4300 -111.4700      15.5        74       126        60
OIR    2025250     91400   18.4300 -111.4800      15.1        74       123        60
OIR    2025250     91400   18.4300 -111.4900      15.2        74       123        60
OIR    2025250     91400   18.4300 -111.5000      16.4        74       122        60
OIR    2025250     91400   18.4300 -111.5100      22.5        74       124        60
OIR    2025250     91400   18.4300 -111.5200      23.1        73       127        60
OIR    2025250     91400   18.4300 -111.5300      20.4        78       127        60
OIR    2025250     91400   18.4300 -111.5400      20.3        80       116        60
OIR    2025250     91400   18.4300 -111.5500      20.2        86       108        60
OIR    2025250     91400   18.4300 -111.5600      20.5        90       105        60
OIR    2025250     91400   18.4300 -111.5700      19.9        91       104        60
OIR    2025250     91400   18.4300 -111.5800      18.0        94       103        60
OIR    2025250     91400   18.4300 -111.5900      17.2        96       103        60
OIR    2025250     91400   18.4300 -111.6000      15.9       103       103        60
OIR    2025250     91400   18.4300 -111.6100      15.2       107       103        60
OIR    2025250     91400   18.4300 -111.6200      14.4       109       103        60
OIR    2025250     91400   18.4300 -111.6300      12.3       112       104        60
OIR    2025250     91400   18.4300 -111.6400      11.5       114       104        60
OIR    2025250     91400   18.4300 -111.6500      11.4       116       105        60
OIR    2025250     91400   18.4300 -111.6600      11.0       116       109        60
OIR    2025250     91400   18.4300 -111.6700       9.2       119       111        60
OIR    2025250     91400   18.4300 -111.6800      11.4       121       123        60
OIR    2025250     91400   18.4300 -111.6900      14.5       113       135        60
OIR    2025250     91400   18.4300 -111.7000      16.4       107       139        60
OIR    2025250     91400   18.4300 -111.7100      16.6       103       141        60
OIR    2025250     91400   18.4300 -111.7200      12.9       113       142        60
OIR    2025250     91400   18.4300 -111.7300       8.6       128       143        60
OIR    2025250     91400   18.4300 -111.8600       6.0        88       141        60
OIR    2025250     91400   18.4300 -111.8700       8.3        79       140        60
OIR    2025250     91400   18.4300 -111.8800       9.0        78       140        60
OIR    2025250     91400   18.4300 -111.8900       9.3        77       141        60
OIR    2025250     91400   18.4300 -111.9000       9.4        77       141        60
OIR    2025250     91400   18.4300 -112.7000       4.1       107       141        60
OIR    2025250     91400   18.4300 -112.7100       4.5       115       137        60
OIR    2025250     91400   18.4300 -112.7200       4.8       120       135        60
OIR    2025250     91400   18.4300 -112.7300       5.2       123       134        60
OIR    2025250     91400   18.4300 -112.7400       5.3       124       133        60
OIR    2025250     91400   18.4300 -112.7500       5.3       124       131        60
OIR    2025250     91400   18.4300 -112.7600       5.3       124       128        60
OIR    2025250     91400   18.4300 -112.7700       5.4       124       126        60
OIR    2025250     91400   18.4300 -112.7800       5.4       124       126        60
OIR    2025250     91400   18.4300 -112.7900       5.4       124       125        60
OIR    2025250     91400   18.4300 -112.8000       5.4       124       126        60
OIR    2025250     91400   18.4300 -112.8100       5.4       124       126        60
OIR    2025250     91400   18.4300 -112.8200       5.4       124       126        60
OIR    2025250     91400   18.4300 -112.8300       5.4       124       126        60
OIR    2025250     91400   18.4300 -112.8400       5.4       124       126        60
OIR    2025250     91400   18.4300 -112.8500       5.4       124       127        60
OIR    2025250     91400   18.4300 -112.8600       5.4       123       128        60
OIR    2025250     91400   18.4300 -112.8700       5.4       123       128        60
OIR    2025250     91400   18.4300 -112.8800       5.4       123       127        60
OIR    2025250     91400   18.4300 -112.8900       5.4       123       127        60
OIR    2025250     91400   18.4300 -112.9000       5.3       122       127        60
OIR    2025250     91400   18.4300 -112.9100       5.3       122       127        60
OIR    2025250     91400   18.4300 -112.9200       5.4       120       126        60
OIR    2025250     91400   18.4300 -112.9300       5.4       118       127        60
OIR    2025250     91400   18.4300 -112.9400       5.4       116       128        60
OIR    2025250     91400   18.4300 -112.9500       5.5       113       128        60
OIR    2025250     91400   18.4300 -112.9600       5.5       111       129        60
OIR    2025250     91400   18.4300 -112.9700       5.5       107       130        60
OIR    2025250     91400   18.4300 -112.9800       5.4       102       131        60
OIR    2025250     91400   18.4300 -112.9900       5.3        96       132        60
OIR    2025250     91400   18.4300 -113.0000       4.8        89       135        60
OIR    2025250     91400   18.4300 -113.0100       4.8        84       141        60
OIR    2025250     91400   18.4300 -113.0600       5.1       351       140        60
OIR    2025250     91400   18.4300 -113.0700       5.0       347       137        60
OIR    2025250     91400   18.4300 -113.0800       4.4       350       137        60
OIR    2025250     91400   18.4300 -113.3300       4.0       131       143        60
OIR    2025250     91400   18.4300 -113.3400       4.2       127       142        60
OIR    2025250     91400   18.4300 -113.3500       4.6       124       137        60
OIR    2025250     91400   18.4300 -113.3600       4.8       121       131        60
OIR    2025250     91400   18.4300 -113.3700       5.0       119       129        60
OIR    2025250     91400   18.4300 -113.3800       5.2       117       130        60
OIR    2025250     91400   18.4300 -113.3900       5.2       115       132        60
OIR    2025250     91400   18.4300 -113.4000       5.2       117       138        60
OIR    2025250     91400   18.4300 -113.4100       5.3       117       141        60
OIR    2025250     91400   18.4300 -113.4200       5.5       115       137        60
OIR    2025250     91400   18.4300 -113.4300       5.6       112       133        60
OIR    2025250     91400   18.4300 -113.4400       5.6       108       133        60
OIR    2025250     91400   18.4300 -113.4500       5.7       104       133        60
OIR    2025250     91400   18.4300 -113.4600       5.6       100       133        60
OIR    2025250     91400   18.4300 -113.4700       5.3        93       134        60
OIR    2025250     91400   18.4300 -113.4800       4.5        87       135        60
OIR    2025250     91400   18.4300 -113.9200       5.7       157       140        60
OIR    2025250     91400   18.4300 -113.9300       5.8       157       137        60
OIR    2025250     91400   18.4300 -113.9400       5.8       157       139        60
OIR    2025250     91400   18.4300 -113.9500       6.0       157       143        60
OIR    2025250     91400   18.4300 -114.0000       5.6       158       142        60
OIR    2025250     91400   18.4300 -114.1800      11.8       182       138        60
OIR    2025250     91400   18.4300 -114.1900      11.6       183       134        60
OIR    2025250     91400   18.4300 -114.2000      11.1       184       132        60
OIR    2025250     91400   18.4300 -114.2100      10.7       184       132        60
OIR    2025250     91400   18.4300 -114.2200      10.4       183       136        60
OIR    2025250     91400   18.4300 -114.2300      10.3       183       141        60
OIR    2025250     91400   18.4200 -108.6800      14.0        53       142        60
OIR    2025250     91400   18.4200 -108.6900      14.0        53       140        60
OIR    2025250     91400   18.4200 -108.7000      14.0        53       136        60
OIR    2025250     91400   18.4200 -108.7100      14.0        53       131        60
OIR    2025250     91400   18.4200 -108.7200      14.0        53       127        60
OIR    2025250     91400   18.4200 -108.7300      14.1        53       125        60
OIR    2025250     91400   18.4200 -108.7400      14.2        54       123        60
OIR    2025250     91400   18.4200 -108.7500      14.2        55       122        60
OIR    2025250     91400   18.4200 -108.7600      14.3        56       121        60
OIR    2025250     91400   18.4200 -108.7700      14.4        57       120        60
OIR    2025250     91400   18.4200 -108.7800      14.4        58       120        60
OIR    2025250     91400   18.4200 -108.7900      14.4        58       119        60
OIR    2025250     91400   18.4200 -108.8000      14.4        58       119        60
OIR    2025250     91400   18.4200 -108.8100      14.4        58       117        60
OIR    2025250     91400   18.4200 -108.8200      14.5        58       117        60
OIR    2025250     91400   18.4200 -108.8300      14.5        58       119        60
OIR    2025250     91400   18.4200 -108.8400      14.5        58       119        60
OIR    2025250     91400   18.4200 -108.8500      14.5        58       119        60
OIR    2025250     91400   18.4200 -108.8600      14.5        58       120        60
OIR    2025250     91400   18.4200 -108.8700      14.5        58       120        60
OIR    2025250     91400   18.4200 -108.8800      14.5        58       119        60
OIR    2025250     91400   18.4200 -108.8900      14.6        58       119        60
OIR    2025250     91400   18.4200 -108.9000      14.6        58       119        60
OIR    2025250     91400   18.4200 -108.9100      14.6        58       120        60
OIR    2025250     91400   18.4200 -108.9200      14.6        58       120        60
OIR    2025250     91400   18.4200 -108.9300      14.6        58       120        60
OIR    2025250     91400   18.4200 -108.9400      14.6        58       120        60
OIR    2025250     91400   18.4200 -108.9500      14.6        58       120        60
OIR    2025250     91400   18.4200 -108.9600      14.7        58       119        60
OIR    2025250     91400   18.4200 -108.9700      14.7        58       120        60
OIR    2025250     91400   18.4200 -108.9800      14.7        58       120        60
OIR    2025250     91400   18.4200 -108.9900      14.7        58       120        60
OIR    2025250     91400   18.4200 -109.0000      14.7        58       120        60
OIR    2025250     91400   18.4200 -109.0100      14.8        58       120        60
OIR    2025250     91400   18.4200 -109.0200      14.8        58       117        60
OIR    2025250     91400   18.4200 -109.0300      14.8        58       116        60
OIR    2025250     91400   18.4200 -109.0400      14.8        58       116        60
OIR    2025250     91400   18.4200 -109.0500      14.9        58       115        60
OIR    2025250     91400   18.4200 -109.0600      14.9        58       114        60
OIR    2025250     91400   18.4200 -109.0700      14.9        58       114        60
OIR    2025250     91400   18.4200 -109.0800      14.9        58       114        60
OIR    2025250     91400   18.4200 -109.0900      14.9        58       114        60
OIR    2025250     91400   18.4200 -109.1000      14.9        58       114        60
OIR    2025250     91400   18.4200 -109.1100      14.9        58       114        60
OIR    2025250     91400   18.4200 -109.1200      14.9        58       112        60
OIR    2025250     91400   18.4200 -109.1300      14.9        58       111        60
OIR    2025250     91400   18.4200 -109.1400      14.9        58       111        60
OIR    2025250     91400   18.4200 -109.1500      15.0        58       112        60
OIR    2025250     91400   18.4200 -109.1600      15.0        58       113        60
OIR    2025250     91400   18.4200 -109.1700      15.0        58       115        60
OIR    2025250     91400   18.4200 -109.1800      15.0        58       116        60
OIR    2025250     91400   18.4200 -109.1900      15.0        58       119        60
OIR    2025250     91400   18.4200 -109.2000      14.9        58       121        60
OIR    2025250     91400   18.4200 -109.2100      14.8        58       123        60
OIR    2025250     91400   18.4200 -109.2200      14.5        58       126        60
OIR    2025250     91400   18.4200 -109.2300      14.2        57       128        60
OIR    2025250     91400   18.4200 -109.2400      14.4        57       131        60
OIR    2025250     91400   18.4200 -109.2500      14.7        56       134        60
OIR    2025250     91400   18.4200 -109.2600      15.1        55       140        60
OIR    2025250     91400   18.4200 -110.7400      17.2        56       142        60
OIR    2025250     91400   18.4200 -110.7500      17.2        56       142        60
OIR    2025250     91400   18.4200 -110.7600      17.2        56       143        60
OIR    2025250     91400   18.4200 -111.2600      12.7        69       143        60
OIR    2025250     91400   18.4200 -111.2700      12.7        70       141        60
OIR    2025250     91400   18.4200 -111.2800      12.7        70       141        60
OIR    2025250     91400   18.4200 -111.2900      12.7        70       140        60
OIR    2025250     91400   18.4200 -111.3000      12.7        71       139        60
OIR    2025250     91400   18.4200 -111.3100      12.7        71       138        60
OIR    2025250     91400   18.4200 -111.3200      12.7        71       136        60
OIR    2025250     91400   18.4200 -111.3300      12.7        71       138        60
OIR    2025250     91400   18.4200 -111.3400      12.6        71       140        60
OIR    2025250     91400   18.4200 -111.3500      12.6        71       137        60
OIR    2025250     91400   18.4200 -111.3600      12.6        71       134        60
OIR    2025250     91400   18.4200 -111.3700      12.6        72       131        60
OIR    2025250     91400   18.4200 -111.3800      12.7        72       131        60
OIR    2025250     91400   18.4200 -111.3900      12.9        72       129        60
OIR    2025250     91400   18.4200 -111.4000      13.2        73       129        60
OIR    2025250     91400   18.4200 -111.4100      13.5        74       128        60
OIR    2025250     91400   18.4200 -111.4200      14.1        75       129        60
OIR    2025250     91400   18.4200 -111.4300      14.8        75       129        60
OIR    2025250     91400   18.4200 -111.4400      15.2        75       130        60
OIR    2025250     91400   18.4200 -111.4500      15.4        75       130        60
OIR    2025250     91400   18.4200 -111.4600      15.3        74       130        60
OIR    2025250     91400   18.4200 -111.4700      15.2        74       127        60
OIR    2025250     91400   18.4200 -111.4800      15.0        73       124        60
OIR    2025250     91400   18.4200 -111.4900      15.0        73       122        60
OIR    2025250     91400   18.4200 -111.5000      15.1        72       121        60
OIR    2025250     91400   18.4200 -111.5100      17.5        72       123        60
OIR    2025250     91400   18.4200 -111.5200      20.9        71       126        60
OIR    2025250     91400   18.4200 -111.5300      20.3        71       128        60
OIR    2025250     91400   18.4200 -111.5400      19.2        75       122        60
OIR    2025250     91400   18.4200 -111.5500      18.8        81       115        60
OIR    2025250     91400   18.4200 -111.5600      19.0        88       110        60
OIR    2025250     91400   18.4200 -111.5700      18.4        90       104        60
OIR    2025250     91400   18.4200 -111.5800      17.6        91       103        60
OIR    2025250     91400   18.4200 -111.5900      17.3        92       103        60
OIR    2025250     91400   18.4200 -111.6000      16.6        95       103        60
OIR    2025250     91400   18.4200 -111.6100      14.7       103       103        60
OIR    2025250     91400   18.4200 -111.6200      13.3       107       103        60
OIR    2025250     91400   18.4200 -111.6300      12.5       110       104        60
OIR    2025250     91400   18.4200 -111.6400      12.0       113       105        60
OIR    2025250     91400   18.4200 -111.6500      11.6       114       108        60
OIR    2025250     91400   18.4200 -111.6600      11.1       114       112        60
OIR    2025250     91400   18.4200 -111.6700      11.4       113       115        60
OIR    2025250     91400   18.4200 -111.6800      14.3        98       121        60
OIR    2025250     91400   18.4200 -111.6900      18.1        83       129        60
OIR    2025250     91400   18.4200 -111.7000      19.5        79       130        60
OIR    2025250     91400   18.4200 -111.7100      20.7        83       126        60
OIR    2025250     91400   18.4200 -111.7200      17.8        81       125        60
OIR    2025250     91400   18.4200 -111.7300      10.8        90       125        60
OIR    2025250     91400   18.4200 -111.7400       5.3       118       126        60
OIR    2025250     91400   18.4200 -111.7500       4.0       188       135        60
OIR    2025250     91400   18.4200 -111.8600       5.8        87       141        60
OIR    2025250     91400   18.4200 -111.8700       8.4        80       140        60
OIR    2025250     91400   18.4200 -111.8800       8.9        79       140        60
OIR    2025250     91400   18.4200 -111.8900       9.3        78       141        60
OIR    2025250     91400   18.4200 -112.6900       4.0       104       142        60
OIR    2025250     91400   18.4200 -112.7000       4.2       110       138        60
OIR    2025250     91400   18.4200 -112.7100       4.6       116       134        60
OIR    2025250     91400   18.4200 -112.7200       4.9       121       131        60
OIR    2025250     91400   18.4200 -112.7300       5.2       123       130        60
OIR    2025250     91400   18.4200 -112.7400       5.3       124       130        60
OIR    2025250     91400   18.4200 -112.7500       5.3       124       128        60
OIR    2025250     91400   18.4200 -112.7600       5.3       124       126        60
OIR    2025250     91400   18.4200 -112.7700       5.3       124       125        60
OIR    2025250     91400   18.4200 -112.7800       5.4       124       124        60
OIR    2025250     91400   18.4200 -112.7900       5.4       124       124        60
OIR    2025250     91400   18.4200 -112.8000       5.4       124       125        60
OIR    2025250     91400   18.4200 -112.8100       5.4       124       126        60
OIR    2025250     91400   18.4200 -112.8200       5.4       124       126        60
OIR    2025250     91400   18.4200 -112.8300       5.4       124       126        60
OIR    2025250     91400   18.4200 -112.8400       5.4       124       127        60
OIR    2025250     91400   18.4200 -112.8500       5.4       124       128        60
OIR    2025250     91400   18.4200 -112.8600       5.4       123       129        60
OIR    2025250     91400   18.4200 -112.8700       5.4       123       128        60
OIR    2025250     91400   18.4200 -112.8800       5.4       123       128        60
OIR    2025250     91400   18.4200 -112.8900       5.4       123       127        60
OIR    2025250     91400   18.4200 -112.9000       5.4       122       127        60
OIR    2025250     91400   18.4200 -112.9100       5.4       122       127        60
OIR    2025250     91400   18.4200 -112.9200       5.5       120       126        60
OIR    2025250     91400   18.4200 -112.9300       5.6       118       126        60
OIR    2025250     91400   18.4200 -112.9400       5.8       116       127        60
OIR    2025250     91400   18.4200 -112.9500       5.9       114       127        60
OIR    2025250     91400   18.4200 -112.9600       5.9       113       128        60
OIR    2025250     91400   18.4200 -112.9700       5.9       110       129        60
OIR    2025250     91400   18.4200 -112.9800       5.8       107       130        60
OIR    2025250     91400   18.4200 -112.9900       5.8       103       132        60
OIR    2025250     91400   18.4200 -113.0000       5.3        99       134        60
OIR    2025250     91400   18.4200 -113.0100       5.2        93       138        60
OIR    2025250     91400   18.4200 -113.0200       5.0        85       142        60
OIR    2025250     91400   18.4200 -113.0500       4.0        23       143        60
OIR    2025250     91400   18.4200 -113.0600       4.3         8       140        60
OIR    2025250     91400   18.4200 -113.0700       4.2         0       138        60
OIR    2025250     91400   18.4200 -113.3400       4.2       117       141        60
OIR    2025250     91400   18.4200 -113.3500       4.7       115       136        60
OIR    2025250     91400   18.4200 -113.3600       5.0       113       131        60
OIR    2025250     91400   18.4200 -113.3700       5.2       112       129        60
OIR    2025250     91400   18.4200 -113.3800       5.4       111       131        60
OIR    2025250     91400   18.4200 -113.3900       5.5       109       134        60
OIR    2025250     91400   18.4200 -113.4000       5.8       108       141        60
OIR    2025250     91400   18.4200 -113.4300       6.2       108       141        60
OIR    2025250     91400   18.4200 -113.4400       6.2       104       139        60
OIR    2025250     91400   18.4200 -113.4500       6.3       100       137        60
OIR    2025250     91400   18.4200 -113.4600       6.3        94       136        60
OIR    2025250     91400   18.4200 -113.4700       5.9        89       136        60
OIR    2025250     91400   18.4200 -113.4800       5.0        84       136        60
OIR    2025250     91400   18.4200 -113.9300       5.7       156       143        60
OIR    2025250     91400   18.4200 -113.9400       5.7       156       142        60
OIR    2025250     91400   18.4200 -113.9700       5.1       162       143        60
OIR    2025250     91400   18.4200 -113.9800       5.1       161       140        60
OIR    2025250     91400   18.4200 -113.9900       5.1       159       140        60
OIR    2025250     91400   18.4200 -114.0000       4.9       159       140        60
OIR    2025250     91400   18.4200 -114.1900      11.1       182       138        60
OIR    2025250     91400   18.4200 -114.2000      10.2       182       133        60
OIR    2025250     91400   18.4200 -114.2100       9.7       183       132        60
OIR    2025250     91400   18.4200 -114.2200       9.8       183       137        60
OIR    2025250     91400   18.4200 -114.2300      10.1       183       142        60
OIR    2025250     91400   18.4200 -114.4400      11.2       209       143        60
OIR    2025250     91400   18.4100 -108.6600      14.0        53       142        60
OIR    2025250     91400   18.4100 -108.6700      14.0        53       140        60
OIR    2025250     91400   18.4100 -108.6800      14.0        53       139        60
OIR    2025250     91400   18.4100 -108.6900      14.0        53       138        60
OIR    2025250     91400   18.4100 -108.7000      14.0        53       136        60
OIR    2025250     91400   18.4100 -108.7100      14.0        53       132        60
OIR    2025250     91400   18.4100 -108.7200      14.0        53       128        60
OIR    2025250     91400   18.4100 -108.7300      14.1        53       125        60
OIR    2025250     91400   18.4100 -108.7400      14.2        54       121        60
OIR    2025250     91400   18.4100 -108.7500      14.2        55       120        60
OIR    2025250     91400   18.4100 -108.7600      14.3        56       120        60
OIR    2025250     91400   18.4100 -108.7700      14.3        57       120        60
OIR    2025250     91400   18.4100 -108.7800      14.4        58       119        60
OIR    2025250     91400   18.4100 -108.7900      14.4        58       119        60
OIR    2025250     91400   18.4100 -108.8000      14.4        58       117        60
OIR    2025250     91400   18.4100 -108.8100      14.4        58       116        60
OIR    2025250     91400   18.4100 -108.8200      14.5        58       116        60
OIR    2025250     91400   18.4100 -108.8300      14.5        58       117        60
OIR    2025250     91400   18.4100 -108.8400      14.5        58       117        60
OIR    2025250     91400   18.4100 -108.8500      14.5        58       117        60
OIR    2025250     91400   18.4100 -108.8600      14.5        58       116        60
OIR    2025250     91400   18.4100 -108.8700      14.5        58       116        60
OIR    2025250     91400   18.4100 -108.8800      14.5        58       117        60
OIR    2025250     91400   18.4100 -108.8900      14.5        58       117        60
OIR    2025250     91400   18.4100 -108.9000      14.6        58       117        60
OIR    2025250     91400   18.4100 -108.9100      14.6        58       117        60
OIR    2025250     91400   18.4100 -108.9200      14.6        58       119        60
OIR    2025250     91400   18.4100 -108.9300      14.6        58       119        60
OIR    2025250     91400   18.4100 -108.9400      14.6        58       120        60
OIR    2025250     91400   18.4100 -108.9500      14.6        58       120        60
OIR    2025250     91400   18.4100 -108.9600      14.6        58       120        60
OIR    2025250     91400   18.4100 -108.9700      14.7        58       119        60
OIR    2025250     91400   18.4100 -108.9800      14.7        58       117        60
OIR    2025250     91400   18.4100 -108.9900      14.7        58       116        60
OIR    2025250     91400   18.4100 -109.0000      14.7        58       116        60
OIR    2025250     91400   18.4100 -109.0100      14.8        58       116        60
OIR    2025250     91400   18.4100 -109.0200      14.8        58       116        60
OIR    2025250     91400   18.4100 -109.0300      14.8        58       116        60
OIR    2025250     91400   18.4100 -109.0400      14.8        58       115        60
OIR    2025250     91400   18.4100 -109.0500      14.9        58       114        60
OIR    2025250     91400   18.4100 -109.0600      14.9        58       113        60
OIR    2025250     91400   18.4100 -109.0700      14.9        58       113        60
OIR    2025250     91400   18.4100 -109.0800      14.9        58       113        60
OIR    2025250     91400   18.4100 -109.0900      14.9        58       113        60
OIR    2025250     91400   18.4100 -109.1000      14.9        58       113        60
OIR    2025250     91400   18.4100 -109.1100      14.9        58       112        60
OIR    2025250     91400   18.4100 -109.1200      14.9        58       111        60
OIR    2025250     91400   18.4100 -109.1300      15.0        58       110        60
OIR    2025250     91400   18.4100 -109.1400      15.0        58       109        60
OIR    2025250     91400   18.4100 -109.1500      15.0        58       109        60
OIR    2025250     91400   18.4100 -109.1600      15.0        58       110        60
OIR    2025250     91400   18.4100 -109.1700      15.0        58       112        60
OIR    2025250     91400   18.4100 -109.1800      15.0        58       114        60
OIR    2025250     91400   18.4100 -109.1900      15.0        58       116        60
OIR    2025250     91400   18.4100 -109.2000      15.0        58       117        60
OIR    2025250     91400   18.4100 -109.2100      14.9        58       120        60
OIR    2025250     91400   18.4100 -109.2200      14.8        58       122        60
OIR    2025250     91400   18.4100 -109.2300      14.8        58       124        60
OIR    2025250     91400   18.4100 -109.2400      14.9        58       126        60
OIR    2025250     91400   18.4100 -109.2500      15.1        57       129        60
OIR    2025250     91400   18.4100 -109.2600      15.7        57       134        60
OIR    2025250     91400   18.4100 -110.7500      17.1        56       143        60
OIR    2025250     91400   18.4100 -110.7900      17.2        56       143        60
OIR    2025250     91400   18.4100 -110.8000      17.2        56       142        60
OIR    2025250     91400   18.4100 -110.8100      17.2        56       143        60
OIR    2025250     91400   18.4100 -111.2600      12.6        69       142        60
OIR    2025250     91400   18.4100 -111.2700      12.6        70       140        60
OIR    2025250     91400   18.4100 -111.2800      12.6        70       139        60
OIR    2025250     91400   18.4100 -111.2900      12.6        71       139        60
OIR    2025250     91400   18.4100 -111.3000      12.6        71       138        60
OIR    2025250     91400   18.4100 -111.3100      12.6        71       136        60
OIR    2025250     91400   18.4100 -111.3200      12.6        71       135        60
OIR    2025250     91400   18.4100 -111.3300      12.6        71       137        60
OIR    2025250     91400   18.4100 -111.3400      12.6        71       139        60
OIR    2025250     91400   18.4100 -111.3500      12.6        71       136        60
OIR    2025250     91400   18.4100 -111.3600      12.6        71       131        60
OIR    2025250     91400   18.4100 -111.3700      12.6        72       128        60
OIR    2025250     91400   18.4100 -111.3800      12.6        72       129        60
OIR    2025250     91400   18.4100 -111.3900      12.7        72       130        60
OIR    2025250     91400   18.4100 -111.4000      12.9        72       129        60
OIR    2025250     91400   18.4100 -111.4100      13.2        73       128        60
OIR    2025250     91400   18.4100 -111.4200      13.5        74       128        60
OIR    2025250     91400   18.4100 -111.4300      14.2        74       129        60
OIR    2025250     91400   18.4100 -111.4400      14.6        74       129        60
OIR    2025250     91400   18.4100 -111.4500      15.0        74       128        60
OIR    2025250     91400   18.4100 -111.4600      15.0        73       127        60
OIR    2025250     91400   18.4100 -111.4700      15.0        73       125        60
OIR    2025250     91400   18.4100 -111.4800      14.8        73       123        60
OIR    2025250     91400   18.4100 -111.4900      14.8        72       123        60
OIR    2025250     91400   18.4100 -111.5000      14.8        72       123        60
OIR    2025250     91400   18.4100 -111.5100      15.3        72       124        60
OIR    2025250     91400   18.4100 -111.5200      17.0        72       125        60
OIR    2025250     91400   18.4100 -111.5300      18.3        72       125        60
OIR    2025250     91400   18.4100 -111.5400      18.1        74       123        60
OIR    2025250     91400   18.4100 -111.5500      18.0        77       119        60
OIR    2025250     91400   18.4100 -111.5600      18.0        83       114        60
OIR    2025250     91400   18.4100 -111.5700      17.2        89       108        60
OIR    2025250     91400   18.4100 -111.5800      17.1        90       104        60
OIR    2025250     91400   18.4100 -111.5900      17.1        91       104        60
OIR    2025250     91400   18.4100 -111.6000      16.8        93       103        60
OIR    2025250     91400   18.4100 -111.6100      14.2       100       103        60
OIR    2025250     91400   18.4100 -111.6200      12.9       106       103        60
OIR    2025250     91400   18.4100 -111.6300      12.4       108       104        60
OIR    2025250     91400   18.4100 -111.6400      12.3       110       107        60
OIR    2025250     91400   18.4100 -111.6500      11.8       110       109        60
OIR    2025250     91400   18.4100 -111.6600      11.9       111       112        60
OIR    2025250     91400   18.4100 -111.6700       9.2        83       115        60
OIR    2025250     91400   18.4100 -111.6800      27.6         9       119        60
OIR    2025250     91400   18.4100 -111.6900      34.0        14       122        60
OIR    2025250     91400   18.4100 -111.7000      38.7        38       122        60
OIR    2025250     91400   18.4100 -111.7100      38.1        60       116        60
OIR    2025250     91400   18.4100 -111.7200      32.2        75       111        60
OIR    2025250     91400   18.4100 -111.7300      16.2        88       111        60
OIR    2025250     91400   18.4100 -111.7400       8.8        92       109        60
OIR    2025250     91400   18.4100 -111.7700       4.0       210       142        60
OIR    2025250     91400   18.4100 -111.8600       5.7        89       141        60
OIR    2025250     91400   18.4100 -111.8700       8.3        81       140        60
OIR    2025250     91400   18.4100 -111.8800       8.7        80       140        60
OIR    2025250     91400   18.4100 -111.8900       9.2        79       142        60
OIR    2025250     91400   18.4100 -112.5000       4.9       103       141        60
OIR    2025250     91400   18.4100 -112.5100       4.9       103       138        60
OIR    2025250     91400   18.4100 -112.5200       4.9       103       139        60
OIR    2025250     91400   18.4100 -112.6700       4.1       100       142        60
OIR    2025250     91400   18.4100 -112.6800       4.1       101       141        60
OIR    2025250     91400   18.4100 -112.6900       4.1       106       140        60
OIR    2025250     91400   18.4100 -112.7000       4.3       113       139        60
OIR    2025250     91400   18.4100 -112.7100       4.7       118       135        60
OIR    2025250     91400   18.4100 -112.7200       5.0       122       132        60
OIR    2025250     91400   18.4100 -112.7300       5.2       123       130        60
OIR    2025250     91400   18.4100 -112.7400       5.3       124       129        60
OIR    2025250     91400   18.4100 -112.7500       5.3       124       127        60
OIR    2025250     91400   18.4100 -112.7600       5.3       124       126        60
OIR    2025250     91400   18.4100 -112.7700       5.3       124       124        60
OIR    2025250     91400   18.4100 -112.7800       5.3       124       124        60
OIR    2025250     91400   18.4100 -112.7900       5.3       124       123        60
OIR    2025250     91400   18.4100 -112.8000       5.4       124       124        60
OIR    2025250     91400   18.4100 -112.8100       5.4       124       125        60
OIR    2025250     91400   18.4100 -112.8200       5.4       124       125        60
OIR    2025250     91400   18.4100 -112.8300       5.4       124       126        60
OIR    2025250     91400   18.4100 -112.8400       5.4       124       126        60
OIR    2025250     91400   18.4100 -112.8500       5.4       124       127        60
OIR    2025250     91400   18.4100 -112.8600       5.4       123       128        60
OIR    2025250     91400   18.4100 -112.8700       5.4       123       127        60
OIR    2025250     91400   18.4100 -112.8800       5.4       123       127        60
OIR    2025250     91400   18.4100 -112.8900       5.4       123       126        60
OIR    2025250     91400   18.4100 -112.9000       5.5       123       126        60
OIR    2025250     91400   18.4100 -112.9100       5.6       122       126        60
OIR    2025250     91400   18.4100 -112.9200       5.8       121       124        60
OIR    2025250     91400   18.4100 -112.9300       6.1       119       123        60
OIR    2025250     91400   18.4100 -112.9400       6.3       118       124        60
OIR    2025250     91400   18.4100 -112.9500       6.3       116       125        60
OIR    2025250     91400   18.4100 -112.9600       6.3       115       126        60
OIR    2025250     91400   18.4100 -112.9700       6.3       113       127        60
OIR    2025250     91400   18.4100 -112.9800       6.2       111       128        60
OIR    2025250     91400   18.4100 -112.9900       6.1       108       130        60
OIR    2025250     91400   18.4100 -113.0000       5.8       105       132        60
OIR    2025250     91400   18.4100 -113.0100       5.6       101       135        60
OIR    2025250     91400   18.4100 -113.0200       5.4        96       139        60
OIR    2025250     91400   18.4100 -113.0300       4.7        91       140        60
OIR    2025250     91400   18.4100 -113.0400       4.0        81       142        60
OIR    2025250     91400   18.4100 -113.1300       5.2       167       142        60
OIR    2025250     91400   18.4100 -113.1400       5.4       168       140        60
OIR    2025250     91400   18.4100 -113.1500       5.4       169       140        60
OIR    2025250     91400   18.4100 -113.1600       5.3       170       140        60
OIR    2025250     91400   18.4100 -113.1700       5.2       170       141        60
OIR    2025250     91400   18.4100 -113.1800       5.0       170       143        60
OIR    2025250     91400   18.4100 -113.3400       4.2       111       142        60
OIR    2025250     91400   18.4100 -113.3500       4.7       110       137        60
OIR    2025250     91400   18.4100 -113.3600       5.1       108       132        60
OIR    2025250     91400   18.4100 -113.3700       5.4       107       129        60
OIR    2025250     91400   18.4100 -113.3800       5.6       106       131        60
OIR    2025250     91400   18.4100 -113.3900       5.8       105       134        60
OIR    2025250     91400   18.4100 -113.4000       6.1       104       140        60
OIR    2025250     91400   18.4100 -113.4800       5.6        81       141        60
OIR    2025250     91400   18.4100 -113.4900       4.1        75       139        60
OIR    2025250     91400   18.4100 -113.9600       4.8       161       142        60
OIR    2025250     91400   18.4100 -113.9700       4.8       161       138        60
OIR    2025250     91400   18.4100 -113.9800       4.8       161       134        60
OIR    2025250     91400   18.4100 -113.9900       4.8       160       135        60
OIR    2025250     91400   18.4100 -114.0000       4.6       160       136        60
OIR    2025250     91400   18.4100 -114.0100       4.5       160       138        60
OIR    2025250     91400   18.4100 -114.0200       4.5       160       142        60
OIR    2025250     91400   18.4100 -114.0700       5.1       165       139        60
OIR    2025250     91400   18.4100 -114.0800       6.7       173       140        60
OIR    2025250     91400   18.4100 -114.1900      10.6       179       140        60
OIR    2025250     91400   18.4100 -114.2000       9.7       180       135        60
OIR    2025250     91400   18.4100 -114.2100       9.5       182       131        60
OIR    2025250     91400   18.4100 -114.2200       9.7       183       134        60
OIR    2025250     91400   18.4100 -114.2300       9.9       184       137        60
OIR    2025250     91400   18.4100 -114.2400      10.1       184       142        60
OIR    2025250     91400   18.4100 -114.4400      10.8       211       142        60
OIR    2025250     91400   18.4100 -114.4500      10.3       212       143        60
OIR    2025250     91400   18.4000 -108.6100      14.0        53       136        60
OIR    2025250     91400   18.4000 -108.6200      14.0        53       141        60
OIR    2025250     91400   18.4000 -108.6700      14.0        53       142        60
OIR    2025250     91400   18.4000 -108.6800      14.0        53       140        60
OIR    2025250     91400   18.4000 -108.6900      14.0        53       139        60
OIR    2025250     91400   18.4000 -108.7000      14.0        53       136        60
OIR    2025250     91400   18.4000 -108.7100      14.0        53       132        60
OIR    2025250     91400   18.4000 -108.7200      14.0        53       129        60
OIR    2025250     91400   18.4000 -108.7300      14.1        53       124        60
OIR    2025250     91400   18.4000 -108.7400      14.1        55       120        60
OIR    2025250     91400   18.4000 -108.7500      14.2        55       116        60
OIR    2025250     91400   18.4000 -108.7600      14.3        56       117        60
OIR    2025250     91400   18.4000 -108.7700      14.3        57       117        60
OIR    2025250     91400   18.4000 -108.7800      14.4        58       117        60
OIR    2025250     91400   18.4000 -108.7900      14.4        58       117        60
OIR    2025250     91400   18.4000 -108.8000      14.4        58       116        60
OIR    2025250     91400   18.4000 -108.8100      14.4        58       116        60
OIR    2025250     91400   18.4000 -108.8200      14.4        58       116        60
OIR    2025250     91400   18.4000 -108.8300      14.5        58       116        60
OIR    2025250     91400   18.4000 -108.8400      14.5        58       116        60
OIR    2025250     91400   18.4000 -108.8500      14.5        58       116        60
OIR    2025250     91400   18.4000 -108.8600      14.5        58       116        60
OIR    2025250     91400   18.4000 -108.8700      14.5        58       115        60
OIR    2025250     91400   18.4000 -108.8800      14.5        58       116        60
OIR    2025250     91400   18.4000 -108.8900      14.5        58       116        60
OIR    2025250     91400   18.4000 -108.9000      14.5        58       116        60
OIR    2025250     91400   18.4000 -108.9100      14.6        58       116        60
OIR    2025250     91400   18.4000 -108.9200      14.6        58       116        60
OIR    2025250     91400   18.4000 -108.9300      14.6        58       117        60
OIR    2025250     91400   18.4000 -108.9400      14.6        58       119        60
OIR    2025250     91400   18.4000 -108.9500      14.6        58       119        60
OIR    2025250     91400   18.4000 -108.9600      14.6        58       120        60
OIR    2025250     91400   18.4000 -108.9700      14.6        58       119        60
OIR    2025250     91400   18.4000 -108.9800      14.7        58       116        60
OIR    2025250     91400   18.4000 -108.9900      14.7        58       113        60
OIR    2025250     91400   18.4000 -109.0000      14.7        58       113        60
OIR    2025250     91400   18.4000 -109.0100      14.7        58       113        60
OIR    2025250     91400   18.4000 -109.0200      14.8        58       114        60
OIR    2025250     91400   18.4000 -109.0300      14.8        58       114        60
OIR    2025250     91400   18.4000 -109.0400      14.8        58       115        60
OIR    2025250     91400   18.4000 -109.0500      14.9        58       114        60
OIR    2025250     91400   18.4000 -109.0600      14.9        58       112        60
OIR    2025250     91400   18.4000 -109.0700      14.9        58       112        60
OIR    2025250     91400   18.4000 -109.0800      14.9        58       112        60
OIR    2025250     91400   18.4000 -109.0900      14.9        58       112        60
OIR    2025250     91400   18.4000 -109.1000      14.9        58       112        60
OIR    2025250     91400   18.4000 -109.1100      15.0        58       111        60
OIR    2025250     91400   18.4000 -109.1200      15.0        58       110        60
OIR    2025250     91400   18.4000 -109.1300      15.0        58       108        60
OIR    2025250     91400   18.4000 -109.1400      15.0        58       108        60
OIR    2025250     91400   18.4000 -109.1500      15.0        58       108        60
OIR    2025250     91400   18.4000 -109.1600      15.1        58       108        60
OIR    2025250     91400   18.4000 -109.1700      15.1        58       111        60
OIR    2025250     91400   18.4000 -109.1800      15.2        58       114        60
OIR    2025250     91400   18.4000 -109.1900      15.2        58       116        60
OIR    2025250     91400   18.4000 -109.2000      15.2        58       116        60
OIR    2025250     91400   18.4000 -109.2100      15.2        58       116        60
OIR    2025250     91400   18.4000 -109.2200      15.1        58       120        60
OIR    2025250     91400   18.4000 -109.2300      15.1        58       123        60
OIR    2025250     91400   18.4000 -109.2400      15.3        57       125        60
OIR    2025250     91400   18.4000 -109.2500      15.5        57       127        60
OIR    2025250     91400   18.4000 -109.2600      15.8        57       129        60
OIR    2025250     91400   18.4000 -109.2700      16.0        57       137        60
OIR    2025250     91400   18.4000 -110.7900      17.2        56       143        60
OIR    2025250     91400   18.4000 -110.8000      17.2        56       139        60
OIR    2025250     91400   18.4000 -110.8100      17.2        56       141        60
OIR    2025250     91400   18.4000 -110.8200      17.2        56       142        60
OIR    2025250     91400   18.4000 -111.2600      12.5        69       142        60
OIR    2025250     91400   18.4000 -111.2700      12.6        70       140        60
OIR    2025250     91400   18.4000 -111.2800      12.6        70       139        60
OIR    2025250     91400   18.4000 -111.2900      12.6        71       139        60
OIR    2025250     91400   18.4000 -111.3000      12.6        71       138        60
OIR    2025250     91400   18.4000 -111.3100      12.6        71       136        60
OIR    2025250     91400   18.4000 -111.3200      12.6        71       135        60
OIR    2025250     91400   18.4000 -111.3300      12.6        71       136        60
OIR    2025250     91400   18.4000 -111.3400      12.6        71       137        60
OIR    2025250     91400   18.4000 -111.3500      12.6        71       135        60
OIR    2025250     91400   18.4000 -111.3600      12.6        71       130        60
OIR    2025250     91400   18.4000 -111.3700      12.6        72       126        60
OIR    2025250     91400   18.4000 -111.3800      12.6        72       127        60
OIR    2025250     91400   18.4000 -111.3900      12.7        72       128        60
OIR    2025250     91400   18.4000 -111.4000      12.7        72       128        60
OIR    2025250     91400   18.4000 -111.4100      12.9        73       127        60
OIR    2025250     91400   18.4000 -111.4200      13.1        73       127        60
OIR    2025250     91400   18.4000 -111.4300      13.5        73       128        60
OIR    2025250     91400   18.4000 -111.4400      13.9        73       129        60
OIR    2025250     91400   18.4000 -111.4500      14.3        73       127        60
OIR    2025250     91400   18.4000 -111.4600      14.6        73       125        60
OIR    2025250     91400   18.4000 -111.4700      14.7        73       123        60
OIR    2025250     91400   18.4000 -111.4800      14.7        72       122        60
OIR    2025250     91400   18.4000 -111.4900      14.7        72       123        60
OIR    2025250     91400   18.4000 -111.5000      14.7        72       125        60
OIR    2025250     91400   18.4000 -111.5100      14.8        73       127        60
OIR    2025250     91400   18.4000 -111.5200      15.4        73       125        60
OIR    2025250     91400   18.4000 -111.5300      16.5        73       123        60
OIR    2025250     91400   18.4000 -111.5400      16.9        74       122        60
OIR    2025250     91400   18.4000 -111.5500      17.4        76       120        60
OIR    2025250     91400   18.4000 -111.5600      17.4        80       117        60
OIR    2025250     91400   18.4000 -111.5700      16.5        86       113        60
OIR    2025250     91400   18.4000 -111.5800      16.4        88       107        60
OIR    2025250     91400   18.4000 -111.5900      16.7        89       104        60
OIR    2025250     91400   18.4000 -111.6000      16.1        92       103        60
OIR    2025250     91400   18.4000 -111.6100      13.2        99       103        60
OIR    2025250     91400   18.4000 -111.6200      12.4       104       104        60
OIR    2025250     91400   18.4000 -111.6300      12.3       106       104        60
OIR    2025250     91400   18.4000 -111.6400      12.2       107       108        60
OIR    2025250     91400   18.4000 -111.6500      12.1       108       112        60
OIR    2025250     91400   18.4000 -111.6600      11.5       108       111        60
OIR    2025250     91400   18.4000 -111.6700      21.9       308       110        60
OIR    2025250     91400   18.4000 -111.6800      38.6       332       110        60
OIR    2025250     91400   18.4000 -111.6900      48.1       341       110        60
OIR    2025250     91400   18.4000 -111.7000      54.4        22       110        60
OIR    2025250     91400   18.4000 -111.7100      54.6        47       109        60
OIR    2025250     91400   18.4000 -111.7200      42.3        70       107        60
OIR    2025250     91400   18.4000 -111.7300      26.0        66       107        60
OIR    2025250     91400   18.4000 -111.7400       9.8        52       105        60
OIR    2025250     91400   18.4000 -111.7500       5.8        37       114        60
OIR    2025250     91400   18.4000 -111.8700       8.0        82       141        60
OIR    2025250     91400   18.4000 -111.8800       8.5        80       140        60
OIR    2025250     91400   18.4000 -111.8900       9.0        79       140        60
OIR    2025250     91400   18.4000 -112.5000       4.9       103       141        60
OIR    2025250     91400   18.4000 -112.5100       4.9       103       139        60
OIR    2025250     91400   18.4000 -112.5200       4.9       103       138        60
OIR    2025250     91400   18.4000 -112.5300       4.9       103       142        60
OIR    2025250     91400   18.4000 -112.6300       4.2       100       141        60
OIR    2025250     91400   18.4000 -112.6400       4.2       100       142        60
OIR    2025250     91400   18.4000 -112.6600       4.1       100       142        60
OIR    2025250     91400   18.4000 -112.6700       4.1       101       138        60
OIR    2025250     91400   18.4000 -112.6800       4.1       103       137        60
OIR    2025250     91400   18.4000 -112.6900       4.1       109       138        60
OIR    2025250     91400   18.4000 -112.7000       4.4       116       138        60
OIR    2025250     91400   18.4000 -112.7100       4.8       120       136        60
OIR    2025250     91400   18.4000 -112.7200       5.0       123       132        60
OIR    2025250     91400   18.4000 -112.7300       5.2       124       130        60
OIR    2025250     91400   18.4000 -112.7400       5.2       124       128        60
OIR    2025250     91400   18.4000 -112.7500       5.3       124       127        60
OIR    2025250     91400   18.4000 -112.7600       5.3       124       125        60
OIR    2025250     91400   18.4000 -112.7700       5.3       124       124        60
OIR    2025250     91400   18.4000 -112.7800       5.3       124       123        60
OIR    2025250     91400   18.4000 -112.7900       5.3       124       122        60
OIR    2025250     91400   18.4000 -112.8000       5.4       124       122        60
OIR    2025250     91400   18.4000 -112.8100       5.4       124       123        60
OIR    2025250     91400   18.4000 -112.8200       5.4       124       124        60
OIR    2025250     91400   18.4000 -112.8300       5.4       124       125        60
OIR    2025250     91400   18.4000 -112.8400       5.4       124       126        60
OIR    2025250     91400   18.4000 -112.8500       5.4       124       126        60
OIR    2025250     91400   18.4000 -112.8600       5.4       123       126        60
OIR    2025250     91400   18.4000 -112.8700       5.4       123       126        60
OIR    2025250     91400   18.4000 -112.8800       5.4       123       126        60
OIR    2025250     91400   18.4000 -112.8900       5.5       123       125        60
OIR    2025250     91400   18.4000 -112.9000       5.7       123       125        60
OIR    2025250     91400   18.4000 -112.9100       5.9       122       125        60
OIR    2025250     91400   18.4000 -112.9200       6.2       121       122        60
OIR    2025250     91400   18.4000 -112.9300       6.5       120       120        60
OIR    2025250     91400   18.4000 -112.9400       6.6       119       121        60
OIR    2025250     91400   18.4000 -112.9500       6.6       118       122        60
OIR    2025250     91400   18.4000 -112.9600       6.6       116       123        60
OIR    2025250     91400   18.4000 -112.9700       6.5       115       125        60
OIR    2025250     91400   18.4000 -112.9800       6.4       113       126        60
OIR    2025250     91400   18.4000 -112.9900       6.2       110       127        60
OIR    2025250     91400   18.4000 -113.0000       6.0       108       129        60
OIR    2025250     91400   18.4000 -113.0100       5.9       106       131        60
OIR    2025250     91400   18.4000 -113.0200       5.7       104       133        60
OIR    2025250     91400   18.4000 -113.0300       5.3       102       135        60
OIR    2025250     91400   18.4000 -113.0400       4.9        99       138        60
OIR    2025250     91400   18.4000 -113.0500       4.3        89       140        60
OIR    2025250     91400   18.4000 -113.0600       4.0        79       142        60
OIR    2025250     91400   18.4000 -113.1400       5.1       163       142        60
OIR    2025250     91400   18.4000 -113.1500       5.2       167       140        60
OIR    2025250     91400   18.4000 -113.1600       4.9       166       137        60
OIR    2025250     91400   18.4000 -113.1700       4.6       163       138        60
OIR    2025250     91400   18.4000 -113.1800       4.2       159       139        60
OIR    2025250     91400   18.4000 -113.3500       4.6       106       140        60
OIR    2025250     91400   18.4000 -113.3600       5.2       104       134        60
OIR    2025250     91400   18.4000 -113.3700       5.5       103       131        60
OIR    2025250     91400   18.4000 -113.3800       5.8       103       133        60
OIR    2025250     91400   18.4000 -113.3900       6.1       102       135        60
OIR    2025250     91400   18.4000 -113.4000       6.3       101       141        60
OIR    2025250     91400   18.4000 -113.9600       4.7       160       141        60
OIR    2025250     91400   18.4000 -113.9700       4.7       160       137        60
OIR    2025250     91400   18.4000 -113.9800       4.6       160       132        60
OIR    2025250     91400   18.4000 -113.9900       4.6       160       131        60
OIR    2025250     91400   18.4000 -114.0000       4.6       160       132        60
OIR    2025250     91400   18.4000 -114.0100       4.5       160       134        60
OIR    2025250     91400   18.4000 -114.0200       4.5       160       137        60
OIR    2025250     91400   18.4000 -114.0300       4.5       159       141        60
OIR    2025250     91400   18.4000 -114.0600       4.6       163       141        60
OIR    2025250     91400   18.4000 -114.0700       4.8       170       135        60
OIR    2025250     91400   18.4000 -114.0800       6.1       177       134        60
OIR    2025250     91400   18.4000 -114.0900       7.9       179       137        60
OIR    2025250     91400   18.4000 -114.1000       9.1       181       140        60
OIR    2025250     91400   18.4000 -114.1100      10.1       182       140        60
OIR    2025250     91400   18.4000 -114.1200      10.9       182       140        60
OIR    2025250     91400   18.4000 -114.1300      11.2       182       139        60
OIR    2025250     91400   18.4000 -114.1400      11.4       182       139        60
OIR    2025250     91400   18.4000 -114.1500      11.6       182       142        60
OIR    2025250     91400   18.4000 -114.1900      10.4       178       141        60
OIR    2025250     91400   18.4000 -114.2000       9.5       179       137        60
OIR    2025250     91400   18.4000 -114.2100       9.3       180       133        60
OIR    2025250     91400   18.4000 -114.2200       9.5       183       133        60
OIR    2025250     91400   18.4000 -114.2300       9.7       185       133        60
OIR    2025250     91400   18.4000 -114.2400      10.1       186       138        60
OIR    2025250     91400   18.3900 -108.6100      14.0        53       130        60
OIR    2025250     91400   18.3900 -108.6200      14.0        53       134        60
OIR    2025250     91400   18.3900 -108.6300      14.0        53       138        60
OIR    2025250     91400   18.3900 -108.6800      14.0        53       142        60
OIR    2025250     91400   18.3900 -108.6900      14.0        53       140        60
OIR    2025250     91400   18.3900 -108.7000      14.0        53       137        60
OIR    2025250     91400   18.3900 -108.7100      14.0        53       133        60
OIR    2025250     91400   18.3900 -108.7200      14.0        53       130        60
OIR    2025250     91400   18.3900 -108.7300      14.1        54       124        60
OIR    2025250     91400   18.3900 -108.7400      14.1        55       117        60
OIR    2025250     91400   18.3900 -108.7500      14.1        56       114        60
OIR    2025250     91400   18.3900 -108.7600      14.2        57       115        60
OIR    2025250     91400   18.3900 -108.7700      14.3        57       116        60
OIR    2025250     91400   18.3900 -108.7800      14.3        58       116        60
OIR    2025250     91400   18.3900 -108.7900      14.4        58       116        60
OIR    2025250     91400   18.3900 -108.8000      14.4        58       115        60
OIR    2025250     91400   18.3900 -108.8100      14.4        58       115        60
OIR    2025250     91400   18.3900 -108.8200      14.4        58       115        60
OIR    2025250     91400   18.3900 -108.8300      14.4        58       115        60
OIR    2025250     91400   18.3900 -108.8400      14.5        58       116        60
OIR    2025250     91400   18.3900 -108.8500      14.5        58       116        60
OIR    2025250     91400   18.3900 -108.8600      14.5        58       115        60
OIR    2025250     91400   18.3900 -108.8700      14.5        58       115        60
OIR    2025250     91400   18.3900 -108.8800      14.5        58       116        60
OIR    2025250     91400   18.3900 -108.8900      14.5        58       117        60
OIR    2025250     91400   18.3900 -108.9000      14.5        58       117        60
OIR    2025250     91400   18.3900 -108.9100      14.5        58       116        60
OIR    2025250     91400   18.3900 -108.9200      14.6        58       116        60
OIR    2025250     91400   18.3900 -108.9300      14.6        58       116        60
OIR    2025250     91400   18.3900 -108.9400      14.6        58       116        60
OIR    2025250     91400   18.3900 -108.9500      14.6        58       116        60
OIR    2025250     91400   18.3900 -108.9600      14.6        58       117        60
OIR    2025250     91400   18.3900 -108.9700      14.6        58       117        60
OIR    2025250     91400   18.3900 -108.9800      14.6        58       116        60
OIR    2025250     91400   18.3900 -108.9900      14.7        58       114        60
OIR    2025250     91400   18.3900 -109.0000      14.7        58       114        60
OIR    2025250     91400   18.3900 -109.0100      14.7        58       114        60
OIR    2025250     91400   18.3900 -109.0200      14.8        58       115        60
OIR    2025250     91400   18.3900 -109.0300      14.8        58       115        60
OIR    2025250     91400   18.3900 -109.0400      14.8        58       115        60
OIR    2025250     91400   18.3900 -109.0500      14.9        58       115        60
OIR    2025250     91400   18.3900 -109.0600      14.9        58       113        60
OIR    2025250     91400   18.3900 -109.0700      14.9        58       112        60
OIR    2025250     91400   18.3900 -109.0800      14.9        58       112        60
OIR    2025250     91400   18.3900 -109.0900      15.0        58       111        60
OIR    2025250     91400   18.3900 -109.1000      15.0        58       111        60
OIR    2025250     91400   18.3900 -109.1100      15.0        58       110        60
OIR    2025250     91400   18.3900 -109.1200      15.1        58       110        60
OIR    2025250     91400   18.3900 -109.1300      15.1        58       108        60
OIR    2025250     91400   18.3900 -109.1400      15.1        58       107        60
OIR    2025250     91400   18.3900 -109.1500      15.1        58       107        60
OIR    2025250     91400   18.3900 -109.1600      15.2        57       108        60
OIR    2025250     91400   18.3900 -109.1700      15.2        57       109        60
OIR    2025250     91400   18.3900 -109.1800      15.2        57       113        60
OIR    2025250     91400   18.3900 -109.1900      15.3        57       115        60
OIR    2025250     91400   18.3900 -109.2000      15.3        57       115        60
OIR    2025250     91400   18.3900 -109.2100      15.3        57       116        60
OIR    2025250     91400   18.3900 -109.2200      15.3        58       117        60
OIR    2025250     91400   18.3900 -109.2300      15.4        58       122        60
OIR    2025250     91400   18.3900 -109.2400      15.4        57       125        60
OIR    2025250     91400   18.3900 -109.2500      15.6        57       125        60
OIR    2025250     91400   18.3900 -109.2600      15.8        57       126        60
OIR    2025250     91400   18.3900 -109.2700      15.9        57       131        60
OIR    2025250     91400   18.3900 -109.2800      15.9        57       137        60
OIR    2025250     91400   18.3900 -110.8000      17.2        56       140        60
OIR    2025250     91400   18.3900 -110.8100      17.2        56       140        60
OIR    2025250     91400   18.3900 -110.8200      17.1        56       141        60
OIR    2025250     91400   18.3900 -110.8300      17.1        56       143        60
OIR    2025250     91400   18.3900 -111.2600      12.5        70       142        60
OIR    2025250     91400   18.3900 -111.2700      12.5        70       141        60
OIR    2025250     91400   18.3900 -111.2800      12.6        71       140        60
OIR    2025250     91400   18.3900 -111.2900      12.6        71       140        60
OIR    2025250     91400   18.3900 -111.3000      12.6        71       140        60
OIR    2025250     91400   18.3900 -111.3100      12.6        71       138        60
OIR    2025250     91400   18.3900 -111.3200      12.6        71       136        60
OIR    2025250     91400   18.3900 -111.3300      12.6        71       136        60
OIR    2025250     91400   18.3900 -111.3400      12.6        71       135        60
OIR    2025250     91400   18.3900 -111.3500      12.6        71       134        60
OIR    2025250     91400   18.3900 -111.3600      12.6        71       131        60
OIR    2025250     91400   18.3900 -111.3700      12.6        72       127        60
OIR    2025250     91400   18.3900 -111.3800      12.6        72       126        60
OIR    2025250     91400   18.3900 -111.3900      12.6        72       125        60
OIR    2025250     91400   18.3900 -111.4000      12.7        72       124        60
OIR    2025250     91400   18.3900 -111.4100      12.7        72       124        60
OIR    2025250     91400   18.3900 -111.4200      12.8        73       124        60
OIR    2025250     91400   18.3900 -111.4300      13.0        73       126        60
OIR    2025250     91400   18.3900 -111.4400      13.3        73       128        60
OIR    2025250     91400   18.3900 -111.4500      13.6        72       126        60
OIR    2025250     91400   18.3900 -111.4600      13.9        72       124        60
OIR    2025250     91400   18.3900 -111.4700      14.2        72       122        60
OIR    2025250     91400   18.3900 -111.4800      14.3        72       122        60
OIR    2025250     91400   18.3900 -111.4900      14.3        72       122        60
OIR    2025250     91400   18.3900 -111.5000      14.4        73       123        60
OIR    2025250     91400   18.3900 -111.5100      14.4        73       124        60
OIR    2025250     91400   18.3900 -111.5200      14.7        73       123        60
OIR    2025250     91400   18.3900 -111.5300      15.2        73       120        60
OIR    2025250     91400   18.3900 -111.5400      16.0        74       119        60
OIR    2025250     91400   18.3900 -111.5500      16.4        76       119        60
OIR    2025250     91400   18.3900 -111.5600      16.5        78       119        60
OIR    2025250     91400   18.3900 -111.5700      15.8        84       115        60
OIR    2025250     91400   18.3900 -111.5800      15.8        87       110        60
OIR    2025250     91400   18.3900 -111.5900      15.8        88       108        60
OIR    2025250     91400   18.3900 -111.6000      14.7        88       105        60
OIR    2025250     91400   18.3900 -111.6100      12.0        92       104        60
OIR    2025250     91400   18.3900 -111.6200      11.4        97       104        60
OIR    2025250     91400   18.3900 -111.6300      11.2        96       104        60
OIR    2025250     91400   18.3900 -111.6400      11.5        96       108        60
OIR    2025250     91400   18.3900 -111.6500      11.9        99       112        60
OIR    2025250     91400   18.3900 -111.6600       8.0       107       111        60
OIR    2025250     91400   18.3900 -111.6700      33.7       274       107        60
OIR    2025250     91400   18.3900 -111.6800      51.1       305       104        60
OIR    2025250     91400   18.3900 -111.6900       7.2       116       104        60
OIR    2025250     91400   18.3900 -111.7000       9.1        74       103        60
OIR    2025250     91400   18.3900 -111.7100      63.2        68       103        60
OIR    2025250     91400   18.3900 -111.7200      53.7        75       103        60
OIR    2025250     91400   18.3900 -111.7300      32.1        69       103        60
OIR    2025250     91400   18.3900 -111.7400      13.3        47       103        60
OIR    2025250     91400   18.3900 -111.7500       7.0        44       108        60
OIR    2025250     91400   18.3900 -111.7600       5.5        45       117        60
OIR    2025250     91400   18.3900 -111.7700       5.1        32       129        60
OIR    2025250     91400   18.3900 -111.8800       8.4        81       140        60
OIR    2025250     91400   18.3900 -111.8900       8.8        80       138        60
OIR    2025250     91400   18.3900 -111.9000       9.3        78       140        60
OIR    2025250     91400   18.3900 -111.9100       9.4        78       142        60
OIR    2025250     91400   18.3900 -112.4700       5.0       106       141        60
OIR    2025250     91400   18.3900 -112.4800       4.9       104       141        60
OIR    2025250     91400   18.3900 -112.4900       4.9       103       141        60
OIR    2025250     91400   18.3900 -112.5000       4.9       103       141        60
OIR    2025250     91400   18.3900 -112.5100       4.9       103       141        60
OIR    2025250     91400   18.3900 -112.5200       4.9       103       141        60
OIR    2025250     91400   18.3900 -112.5300       4.9       103       141        60
OIR    2025250     91400   18.3900 -112.5500       4.8       103       141        60
OIR    2025250     91400   18.3900 -112.5600       4.8       103       140        60
OIR    2025250     91400   18.3900 -112.6300       4.2       101       141        60
OIR    2025250     91400   18.3900 -112.6400       4.2       101       139        60
OIR    2025250     91400   18.3900 -112.6500       4.1       101       139        60
OIR    2025250     91400   18.3900 -112.6600       4.1       101       138        60
OIR    2025250     91400   18.3900 -112.6700       4.1       103       136        60
OIR    2025250     91400   18.3900 -112.6800       4.1       106       135        60
OIR    2025250     91400   18.3900 -112.6900       4.2       113       136        60
OIR    2025250     91400   18.3900 -112.7000       4.5       118       136        60
OIR    2025250     91400   18.3900 -112.7100       4.8       121       134        60
OIR    2025250     91400   18.3900 -112.7200       5.1       123       132        60
OIR    2025250     91400   18.3900 -112.7300       5.2       124       130        60
OIR    2025250     91400   18.3900 -112.7400       5.2       124       128        60
OIR    2025250     91400   18.3900 -112.7500       5.2       124       127        60
OIR    2025250     91400   18.3900 -112.7600       5.3       124       126        60
OIR    2025250     91400   18.3900 -112.7700       5.3       124       124        60
OIR    2025250     91400   18.3900 -112.7800       5.3       124       123        60
OIR    2025250     91400   18.3900 -112.7900       5.3       124       121        60
OIR    2025250     91400   18.3900 -112.8000       5.3       124       121        60
OIR    2025250     91400   18.3900 -112.8100       5.4       124       122        60
OIR    2025250     91400   18.3900 -112.8200       5.4       124       124        60
OIR    2025250     91400   18.3900 -112.8300       5.4       124       125        60
OIR    2025250     91400   18.3900 -112.8400       5.4       124       126        60
OIR    2025250     91400   18.3900 -112.8500       5.4       124       126        60
OIR    2025250     91400   18.3900 -112.8600       5.4       124       125        60
OIR    2025250     91400   18.3900 -112.8700       5.5       123       125        60
OIR    2025250     91400   18.3900 -112.8800       5.6       123       124        60
OIR    2025250     91400   18.3900 -112.8900       5.7       123       124        60
OIR    2025250     91400   18.3900 -112.9000       5.9       122       124        60
OIR    2025250     91400   18.3900 -112.9100       6.3       121       123        60
OIR    2025250     91400   18.3900 -112.9200       6.6       120       122        60
OIR    2025250     91400   18.3900 -112.9300       6.7       120       119        60
OIR    2025250     91400   18.3900 -112.9400       6.8       119       119        60
OIR    2025250     91400   18.3900 -112.9500       6.8       118       121        60
OIR    2025250     91400   18.3900 -112.9600       6.8       117       122        60
OIR    2025250     91400   18.3900 -112.9700       6.7       116       123        60
OIR    2025250     91400   18.3900 -112.9800       6.6       114       125        60
OIR    2025250     91400   18.3900 -112.9900       6.4       112       126        60
OIR    2025250     91400   18.3900 -113.0000       6.2       110       127        60
OIR    2025250     91400   18.3900 -113.0100       6.0       109       129        60
OIR    2025250     91400   18.3900 -113.0200       5.8       108       131        60
OIR    2025250     91400   18.3900 -113.0300       5.5       107       132        60
OIR    2025250     91400   18.3900 -113.0400       5.2       105       135        60
OIR    2025250     91400   18.3900 -113.0500       4.8       103       138        60
OIR    2025250     91400   18.3900 -113.0600       4.6       101       142        60
OIR    2025250     91400   18.3900 -113.1500       4.3       147       141        60
OIR    2025250     91400   18.3900 -113.1600       4.2       150       136        60
OIR    2025250     91400   18.3900 -113.1700       4.1       144       135        60
OIR    2025250     91400   18.3900 -113.3600       5.1       101       141        60
OIR    2025250     91400   18.3900 -113.3700       5.7       100       136        60
OIR    2025250     91400   18.3900 -113.3800       6.1        99       138        60
OIR    2025250     91400   18.3900 -113.3900       6.3        99       141        60
OIR    2025250     91400   18.3900 -113.9600       4.7       160       142        60
OIR    2025250     91400   18.3900 -113.9700       4.6       160       137        60
OIR    2025250     91400   18.3900 -113.9800       4.6       160       133        60
OIR    2025250     91400   18.3900 -113.9900       4.5       160       130        60
OIR    2025250     91400   18.3900 -114.0000       4.5       159       130        60
OIR    2025250     91400   18.3900 -114.0100       4.5       159       130        60
OIR    2025250     91400   18.3900 -114.0200       4.5       159       134        60
OIR    2025250     91400   18.3900 -114.0300       4.5       159       137        60
OIR    2025250     91400   18.3900 -114.0400       4.5       159       138        60
OIR    2025250     91400   18.3900 -114.0500       4.5       159       139        60
OIR    2025250     91400   18.3900 -114.0600       4.4       163       138        60
OIR    2025250     91400   18.3900 -114.0700       4.6       170       133        60
OIR    2025250     91400   18.3900 -114.0800       5.4       177       130        60
OIR    2025250     91400   18.3900 -114.0900       7.3       180       132        60
OIR    2025250     91400   18.3900 -114.1000       8.5       181       133        60
OIR    2025250     91400   18.3900 -114.1100       9.2       182       135        60
OIR    2025250     91400   18.3900 -114.1200      10.1       183       136        60
OIR    2025250     91400   18.3900 -114.1300      10.4       182       135        60
OIR    2025250     91400   18.3900 -114.1400      10.9       182       134        60
OIR    2025250     91400   18.3900 -114.1500      11.3       181       136        60
OIR    2025250     91400   18.3900 -114.1600      11.3       180       138        60
OIR    2025250     91400   18.3900 -114.1700      10.9       179       140        60
OIR    2025250     91400   18.3900 -114.1800      10.4       178       137        60
OIR    2025250     91400   18.3900 -114.1900      10.0       179       134        60
OIR    2025250     91400   18.3900 -114.2000       9.3       180       132        60
OIR    2025250     91400   18.3900 -114.2100       9.1       180       131        60
OIR    2025250     91400   18.3900 -114.2200       9.3       184       131        60
OIR    2025250     91400   18.3900 -114.2300       9.6       186       132        60
OIR    2025250     91400   18.3900 -114.2400      10.0       188       134        60
OIR    2025250     91400   18.3900 -114.2500      10.2       191       139        60
OIR    2025250     91400   18.3900 -114.2600      10.9       199       142        60
OIR    2025250     91400   18.3900 -114.2700      11.2       202       142        60
OIR    2025250     91400   18.3900 -114.2800      11.0       204       142        60
OIR    2025250     91400   18.3900 -114.2900      10.6       206       142        60
OIR    2025250     91400   18.3900 -114.3000      10.9       207       142        60
OIR    2025250     91400   18.3800 -108.6100      14.0        53       128        60
OIR    2025250     91400   18.3800 -108.6200      14.0        53       132        60
OIR    2025250     91400   18.3800 -108.6300      14.1        53       135        60
OIR    2025250     91400   18.3800 -108.6400      14.1        53       141        60
OIR    2025250     91400   18.3800 -108.6900      14.0        53       142        60
OIR    2025250     91400   18.3800 -108.7000      14.0        53       140        60
OIR    2025250     91400   18.3800 -108.7100      14.0        53       136        60
OIR    2025250     91400   18.3800 -108.7200      14.0        53       132        60
OIR    2025250     91400   18.3800 -108.7300      14.1        53       126        60
OIR    2025250     91400   18.3800 -108.7400      14.2        55       120        60
OIR    2025250     91400   18.3800 -108.7500      14.1        56       115        60
OIR    2025250     91400   18.3800 -108.7600      14.1        57       115        60
OIR    2025250     91400   18.3800 -108.7700      14.2        58       115        60
OIR    2025250     91400   18.3800 -108.7800      14.2        58       115        60
OIR    2025250     91400   18.3800 -108.7900      14.3        58       114        60
OIR    2025250     91400   18.3800 -108.8000      14.3        58       113        60
OIR    2025250     91400   18.3800 -108.8100      14.4        58       113        60
OIR    2025250     91400   18.3800 -108.8200      14.4        58       114        60
OIR    2025250     91400   18.3800 -108.8300      14.4        58       114        60
OIR    2025250     91400   18.3800 -108.8400      14.4        58       114        60
OIR    2025250     91400   18.3800 -108.8500      14.5        58       114        60
OIR    2025250     91400   18.3800 -108.8600      14.5        58       114        60
OIR    2025250     91400   18.3800 -108.8700      14.5        58       115        60
OIR    2025250     91400   18.3800 -108.8800      14.5        58       116        60
OIR    2025250     91400   18.3800 -108.8900      14.5        58       116        60
OIR    2025250     91400   18.3800 -108.9000      14.5        58       117        60
OIR    2025250     91400   18.3800 -108.9100      14.5        59       116        60
OIR    2025250     91400   18.3800 -108.9200      14.5        59       116        60
OIR    2025250     91400   18.3800 -108.9300      14.6        59       115        60
OIR    2025250     91400   18.3800 -108.9400      14.6        59       115        60
OIR    2025250     91400   18.3800 -108.9500      14.6        59       115        60
OIR    2025250     91400   18.3800 -108.9600      14.6        59       115        60
OIR    2025250     91400   18.3800 -108.9700      14.6        59       116        60
OIR    2025250     91400   18.3800 -108.9800      14.6        59       115        60
OIR    2025250     91400   18.3800 -108.9900      14.6        58       114        60
OIR    2025250     91400   18.3800 -109.0000      14.7        58       115        60
OIR    2025250     91400   18.3800 -109.0100      14.7        58       116        60
OIR    2025250     91400   18.3800 -109.0200      14.7        58       116        60
OIR    2025250     91400   18.3800 -109.0300      14.8        58       116        60
OIR    2025250     91400   18.3800 -109.0400      14.8        58       116        60
OIR    2025250     91400   18.3800 -109.0500      14.9        58       116        60
OIR    2025250     91400   18.3800 -109.0600      14.9        58       115        60
OIR    2025250     91400   18.3800 -109.0700      14.9        58       114        60
OIR    2025250     91400   18.3800 -109.0800      15.0        58       113        60
OIR    2025250     91400   18.3800 -109.0900      15.1        58       112        60
OIR    2025250     91400   18.3800 -109.1000      15.1        57       111        60
OIR    2025250     91400   18.3800 -109.1100      15.2        57       110        60
OIR    2025250     91400   18.3800 -109.1200      15.2        57       109        60
OIR    2025250     91400   18.3800 -109.1300      15.2        57       108        60
OIR    2025250     91400   18.3800 -109.1400      15.2        57       107        60
OIR    2025250     91400   18.3800 -109.1500      15.2        57       108        60
OIR    2025250     91400   18.3800 -109.1600      15.2        57       108        60
OIR    2025250     91400   18.3800 -109.1700      15.3        57       109        60
OIR    2025250     91400   18.3800 -109.1800      15.3        57       111        60
OIR    2025250     91400   18.3800 -109.1900      15.3        57       114        60
OIR    2025250     91400   18.3800 -109.2000      15.3        57       115        60
OIR    2025250     91400   18.3800 -109.2100      15.4        57       116        60
OIR    2025250     91400   18.3800 -109.2200      15.4        58       119        60
OIR    2025250     91400   18.3800 -109.2300      15.4        58       122        60
OIR    2025250     91400   18.3800 -109.2400      15.5        58       125        60
OIR    2025250     91400   18.3800 -109.2500      15.7        57       126        60
OIR    2025250     91400   18.3800 -109.2600      15.8        57       126        60
OIR    2025250     91400   18.3800 -109.2700      15.9        57       128        60
OIR    2025250     91400   18.3800 -109.2800      15.9        58       132        60
OIR    2025250     91400   18.3800 -109.2900      15.5        58       136        60
OIR    2025250     91400   18.3800 -109.3000      13.6        63       139        60
OIR    2025250     91400   18.3800 -110.8000      17.0        56       141        60
OIR    2025250     91400   18.3800 -110.8100      17.1        56       140        60
OIR    2025250     91400   18.3800 -110.8200      17.0        56       140        60
OIR    2025250     91400   18.3800 -110.8300      17.0        56       141        60
OIR    2025250     91400   18.3800 -111.2600      12.5        70       142        60
OIR    2025250     91400   18.3800 -111.2700      12.5        70       141        60
OIR    2025250     91400   18.3800 -111.2800      12.5        71       139        60
OIR    2025250     91400   18.3800 -111.2900      12.6        71       140        60
OIR    2025250     91400   18.3800 -111.3000      12.6        71       141        60
OIR    2025250     91400   18.3800 -111.3100      12.6        71       139        60
OIR    2025250     91400   18.3800 -111.3200      12.6        71       137        60
OIR    2025250     91400   18.3800 -111.3300      12.6        71       136        60
OIR    2025250     91400   18.3800 -111.3400      12.6        71       134        60
OIR    2025250     91400   18.3800 -111.3500      12.6        71       133        60
OIR    2025250     91400   18.3800 -111.3600      12.6        71       131        60
OIR    2025250     91400   18.3800 -111.3700      12.6        72       129        60
OIR    2025250     91400   18.3800 -111.3800      12.6        72       127        60
OIR    2025250     91400   18.3800 -111.3900      12.6        72       124        60
OIR    2025250     91400   18.3800 -111.4000      12.6        72       123        60
OIR    2025250     91400   18.3800 -111.4100      12.6        72       122        60
OIR    2025250     91400   18.3800 -111.4200      12.7        72       122        60
OIR    2025250     91400   18.3800 -111.4300      12.7        72       124        60
OIR    2025250     91400   18.3800 -111.4400      12.8        72       127        60
OIR    2025250     91400   18.3800 -111.4500      13.0        72       126        60
OIR    2025250     91400   18.3800 -111.4600      13.2        72       123        60
OIR    2025250     91400   18.3800 -111.4700      13.4        72       122        60
OIR    2025250     91400   18.3800 -111.4800      13.6        72       122        60
OIR    2025250     91400   18.3800 -111.4900      13.7        73       122        60
OIR    2025250     91400   18.3800 -111.5000      13.8        73       122        60
OIR    2025250     91400   18.3800 -111.5100      13.8        73       122        60
OIR    2025250     91400   18.3800 -111.5200      13.8        73       120        60
OIR    2025250     91400   18.3800 -111.5300      14.0        73       116        60
OIR    2025250     91400   18.3800 -111.5400      14.8        74       116        60
OIR    2025250     91400   18.3800 -111.5500      15.2        75       116        60
OIR    2025250     91400   18.3800 -111.5600      15.3        77       116        60
OIR    2025250     91400   18.3800 -111.5700      14.6        81       116        60
OIR    2025250     91400   18.3800 -111.5800      14.1        83       113        60
OIR    2025250     91400   18.3800 -111.5900      13.8        84       110        60
OIR    2025250     91400   18.3800 -111.6000      12.8        82       108        60
OIR    2025250     91400   18.3800 -111.6100      10.8        79       107        60
OIR    2025250     91400   18.3800 -111.6200      10.2        79       107        60
OIR    2025250     91400   18.3800 -111.6300      10.2        80       107        60
OIR    2025250     91400   18.3800 -111.6400      10.8        82       108        60
OIR    2025250     91400   18.3800 -111.6500      11.3        84       110        60
OIR    2025250     91400   18.3800 -111.6600       7.5        94       109        60
OIR    2025250     91400   18.3800 -111.6700      41.7       253       105        60
OIR    2025250     91400   18.3800 -111.6800      58.1       234       104        60
OIR    2025250     91400   18.3800 -111.6900      10.6       163       104        60
OIR    2025250     91400   18.3800 -111.7000       8.9       153       103        60
OIR    2025250     91400   18.3800 -111.7200      56.6        95       103        60
OIR    2025250     91400   18.3800 -111.7300      32.7        78       104        60
OIR    2025250     91400   18.3800 -111.7400      11.2        58       105        60
OIR    2025250     91400   18.3800 -111.7500       8.4        41       109        60
OIR    2025250     91400   18.3800 -111.7600       7.1        35       120        60
OIR    2025250     91400   18.3800 -111.7700       6.5        35       130        60
OIR    2025250     91400   18.3800 -111.8800       8.2        81       141        60
OIR    2025250     91400   18.3800 -111.8900       8.7        80       137        60
OIR    2025250     91400   18.3800 -111.9000       9.2        78       138        60
OIR    2025250     91400   18.3800 -111.9100       9.4        78       140        60
OIR    2025250     91400   18.3800 -111.9200       9.5        78       142        60
OIR    2025250     91400   18.3800 -112.4800       5.0       105       142        60
OIR    2025250     91400   18.3800 -112.4900       4.9       104       141        60
OIR    2025250     91400   18.3800 -112.5000       4.9       104       141        60
OIR    2025250     91400   18.3800 -112.5100       4.9       103       141        60
OIR    2025250     91400   18.3800 -112.5200       4.9       103       141        60
OIR    2025250     91400   18.3800 -112.5300       4.9       103       142        60
OIR    2025250     91400   18.3800 -112.5400       4.8       103       142        60
OIR    2025250     91400   18.3800 -112.5500       4.8       103       141        60
OIR    2025250     91400   18.3800 -112.5600       4.8       103       139        60
OIR    2025250     91400   18.3800 -112.5700       4.7       103       139        60
OIR    2025250     91400   18.3800 -112.5800       4.6       103       142        60
OIR    2025250     91400   18.3800 -112.6300       4.2       102       141        60
OIR    2025250     91400   18.3800 -112.6400       4.2       102       139        60
OIR    2025250     91400   18.3800 -112.6500       4.1       102       137        60
OIR    2025250     91400   18.3800 -112.6600       4.1       103       135        60
OIR    2025250     91400   18.3800 -112.6700       4.1       105       134        60
OIR    2025250     91400   18.3800 -112.6800       4.2       111       133        60
OIR    2025250     91400   18.3800 -112.6900       4.4       117       134        60
OIR    2025250     91400   18.3800 -112.7000       4.6       120       135        60
OIR    2025250     91400   18.3800 -112.7100       4.9       122       133        60
OIR    2025250     91400   18.3800 -112.7200       5.1       123       131        60
OIR    2025250     91400   18.3800 -112.7300       5.1       124       129        60
OIR    2025250     91400   18.3800 -112.7400       5.2       124       128        60
OIR    2025250     91400   18.3800 -112.7500       5.2       124       127        60
OIR    2025250     91400   18.3800 -112.7600       5.3       124       126        60
OIR    2025250     91400   18.3800 -112.7700       5.3       124       124        60
OIR    2025250     91400   18.3800 -112.7800       5.3       124       122        60
OIR    2025250     91400   18.3800 -112.7900       5.3       124       120        60
OIR    2025250     91400   18.3800 -112.8000       5.3       124       120        60
OIR    2025250     91400   18.3800 -112.8100       5.4       124       121        60
OIR    2025250     91400   18.3800 -112.8200       5.4       124       123        60
OIR    2025250     91400   18.3800 -112.8300       5.4       124       124        60
OIR    2025250     91400   18.3800 -112.8400       5.4       124       125        60
OIR    2025250     91400   18.3800 -112.8500       5.4       124       125        60
OIR    2025250     91400   18.3800 -112.8600       5.5       124       125        60
OIR    2025250     91400   18.3800 -112.8700       5.6       123       124        60
OIR    2025250     91400   18.3800 -112.8800       5.8       123       123        60
OIR    2025250     91400   18.3800 -112.8900       6.0       122       122        60
OIR    2025250     91400   18.3800 -112.9000       6.3       122       122        60
OIR    2025250     91400   18.3800 -112.9100       6.7       121       122        60
OIR    2025250     91400   18.3800 -112.9200       6.9       120       121        60
OIR    2025250     91400   18.3800 -112.9300       6.9       120       119        60
OIR    2025250     91400   18.3800 -112.9400       6.9       119       119        60
OIR    2025250     91400   18.3800 -112.9500       6.9       118       121        60
OIR    2025250     91400   18.3800 -112.9600       6.9       118       123        60
OIR    2025250     91400   18.3800 -112.9700       6.8       117       124        60
OIR    2025250     91400   18.3800 -112.9800       6.7       116       125        60
OIR    2025250     91400   18.3800 -112.9900       6.5       114       127        60
OIR    2025250     91400   18.3800 -113.0000       6.3       112       128        60
OIR    2025250     91400   18.3800 -113.0100       6.1       110       130        60
OIR    2025250     91400   18.3800 -113.0200       5.9       109       132        60
OIR    2025250     91400   18.3800 -113.0300       5.6       108       134        60
OIR    2025250     91400   18.3800 -113.0400       5.3       106       135        60
OIR    2025250     91400   18.3800 -113.0500       4.9       104       136        60
OIR    2025250     91400   18.3800 -113.0600       4.7       102       139        60
OIR    2025250     91400   18.3800 -113.0700       4.5       100       142        60
OIR    2025250     91400   18.3800 -113.0800       4.5       100       144        60
OIR    2025250     91400   18.3800 -113.1100       4.4       100       143        60
OIR    2025250     91400   18.3800 -113.1200       4.4       102       141        60
OIR    2025250     91400   18.3800 -113.1300       4.4       106       141        60
OIR    2025250     91400   18.3800 -113.1400       4.3       113       141        60
OIR    2025250     91400   18.3800 -113.1500       4.1       118       139        60
OIR    2025250     91400   18.3800 -113.1600       4.0       118       137        60
OIR    2025250     91400   18.3800 -113.3700       5.9        98       141        60
OIR    2025250     91400   18.3800 -113.3800       6.3        97       142        60
OIR    2025250     91400   18.3800 -113.9700       4.6       160       141        60
OIR    2025250     91400   18.3800 -113.9800       4.6       160       136        60
OIR    2025250     91400   18.3800 -113.9900       4.5       160       132        60
OIR    2025250     91400   18.3800 -114.0000       4.5       159       130        60
OIR    2025250     91400   18.3800 -114.0100       4.5       159       128        60
OIR    2025250     91400   18.3800 -114.0200       4.5       159       131        60
OIR    2025250     91400   18.3800 -114.0300       4.5       159       134        60
OIR    2025250     91400   18.3800 -114.0400       4.5       159       134        60
OIR    2025250     91400   18.3800 -114.0500       4.4       160       134        60
OIR    2025250     91400   18.3800 -114.0600       4.1       164       133        60
OIR    2025250     91400   18.3800 -114.0700       4.2       170       131        60
OIR    2025250     91400   18.3800 -114.0800       4.6       177       128        60
OIR    2025250     91400   18.3800 -114.0900       5.3       178       129        60
OIR    2025250     91400   18.3800 -114.1000       6.9       181       129        60
OIR    2025250     91400   18.3800 -114.1100       7.8       182       130        60
OIR    2025250     91400   18.3800 -114.1200       8.4       183       131        60
OIR    2025250     91400   18.3800 -114.1300       8.7       182       131        60
OIR    2025250     91400   18.3800 -114.1400       9.1       181       130        60
OIR    2025250     91400   18.3800 -114.1500      10.2       181       130        60
OIR    2025250     91400   18.3800 -114.1600      10.5       180       133        60
OIR    2025250     91400   18.3800 -114.1700      10.3       179       134        60
OIR    2025250     91400   18.3800 -114.1800       9.8       178       131        60
OIR    2025250     91400   18.3800 -114.1900       9.3       178       128        60
OIR    2025250     91400   18.3800 -114.2000       8.9       180       127        60
OIR    2025250     91400   18.3800 -114.2100       8.8       181       128        60
OIR    2025250     91400   18.3800 -114.2200       9.0       185       129        60
OIR    2025250     91400   18.3800 -114.2300       9.5       187       130        60
OIR    2025250     91400   18.3800 -114.2400       9.8       189       131        60
OIR    2025250     91400   18.3800 -114.2500      10.0       192       133        60
OIR    2025250     91400   18.3800 -114.2600      10.1       198       135        60
OIR    2025250     91400   18.3800 -114.2700       9.6       205       137        60
OIR    2025250     91400   18.3800 -114.2800       9.0       210       139        60
OIR    2025250     91400   18.3800 -114.2900       9.1       211       138        60
OIR    2025250     91400   18.3800 -114.3000       9.5       211       137        60
OIR    2025250     91400   18.3800 -114.3100       9.1       211       139        60
OIR    2025250     91400   18.3700 -108.6100      14.1        53       127        60
OIR    2025250     91400   18.3700 -108.6200      14.1        53       130        60
OIR    2025250     91400   18.3700 -108.6300      14.1        53       133        60
OIR    2025250     91400   18.3700 -108.6400      14.1        53       138        60
OIR    2025250     91400   18.3700 -108.7100      14.0        53       139        60
OIR    2025250     91400   18.3700 -108.7200      14.1        53       134        60
OIR    2025250     91400   18.3700 -108.7300      14.1        54       129        60
OIR    2025250     91400   18.3700 -108.7400      14.2        55       123        60
OIR    2025250     91400   18.3700 -108.7500      14.2        56       116        60
OIR    2025250     91400   18.3700 -108.7600      14.1        57       116        60
OIR    2025250     91400   18.3700 -108.7700      14.1        58       116        60
OIR    2025250     91400   18.3700 -108.7800      14.2        58       115        60
OIR    2025250     91400   18.3700 -108.7900      14.2        58       113        60
OIR    2025250     91400   18.3700 -108.8000      14.3        58       110        60
OIR    2025250     91400   18.3700 -108.8100      14.3        58       111        60
OIR    2025250     91400   18.3700 -108.8200      14.4        58       111        60
OIR    2025250     91400   18.3700 -108.8300      14.4        58       111        60
OIR    2025250     91400   18.3700 -108.8400      14.4        58       111        60
OIR    2025250     91400   18.3700 -108.8500      14.4        58       111        60
OIR    2025250     91400   18.3700 -108.8600      14.5        59       112        60
OIR    2025250     91400   18.3700 -108.8700      14.5        59       113        60
OIR    2025250     91400   18.3700 -108.8800      14.5        59       113        60
OIR    2025250     91400   18.3700 -108.8900      14.5        59       114        60
OIR    2025250     91400   18.3700 -108.9000      14.5        59       115        60
OIR    2025250     91400   18.3700 -108.9100      14.5        59       115        60
OIR    2025250     91400   18.3700 -108.9200      14.5        59       116        60
OIR    2025250     91400   18.3700 -108.9300      14.5        59       115        60
OIR    2025250     91400   18.3700 -108.9400      14.6        59       114        60
OIR    2025250     91400   18.3700 -108.9500      14.6        59       113        60
OIR    2025250     91400   18.3700 -108.9600      14.6        59       114        60
OIR    2025250     91400   18.3700 -108.9700      14.6        59       115        60
OIR    2025250     91400   18.3700 -108.9800      14.6        59       115        60
OIR    2025250     91400   18.3700 -108.9900      14.6        59       115        60
OIR    2025250     91400   18.3700 -109.0000      14.6        59       115        60
OIR    2025250     91400   18.3700 -109.0100      14.7        58       116        60
OIR    2025250     91400   18.3700 -109.0200      14.7        58       116        60
OIR    2025250     91400   18.3700 -109.0300      14.8        58       116        60
OIR    2025250     91400   18.3700 -109.0400      14.8        58       116        60
OIR    2025250     91400   18.3700 -109.0500      14.9        58       115        60
OIR    2025250     91400   18.3700 -109.0600      14.9        58       114        60
OIR    2025250     91400   18.3700 -109.0700      14.9        58       114        60
OIR    2025250     91400   18.3700 -109.0800      15.0        58       113        60
OIR    2025250     91400   18.3700 -109.0900      15.1        57       111        60
OIR    2025250     91400   18.3700 -109.1000      15.2        57       111        60
OIR    2025250     91400   18.3700 -109.1100      15.2        57       110        60
OIR    2025250     91400   18.3700 -109.1200      15.2        57       110        60
OIR    2025250     91400   18.3700 -109.1300      15.2        57       109        60
OIR    2025250     91400   18.3700 -109.1400      15.2        57       108        60
OIR    2025250     91400   18.3700 -109.1500      15.2        57       108        60
OIR    2025250     91400   18.3700 -109.1600      15.3        57       109        60
OIR    2025250     91400   18.3700 -109.1700      15.3        57       109        60
OIR    2025250     91400   18.3700 -109.1800      15.3        57       110        60
OIR    2025250     91400   18.3700 -109.1900      15.3        57       112        60
OIR    2025250     91400   18.3700 -109.2000      15.4        57       114        60
OIR    2025250     91400   18.3700 -109.2100      15.4        57       116        60
OIR    2025250     91400   18.3700 -109.2200      15.4        58       119        60
OIR    2025250     91400   18.3700 -109.2300      15.4        58       122        60
OIR    2025250     91400   18.3700 -109.2400      15.5        58       126        60
OIR    2025250     91400   18.3700 -109.2500      15.7        57       126        60
OIR    2025250     91400   18.3700 -109.2600      15.8        57       126        60
OIR    2025250     91400   18.3700 -109.2700      15.9        57       127        60
OIR    2025250     91400   18.3700 -109.2800      16.0        57       128        60
OIR    2025250     91400   18.3700 -109.2900      15.7        58       130        60
OIR    2025250     91400   18.3700 -109.3000      15.4        59       131        60
OIR    2025250     91400   18.3700 -109.3100      15.7        59       132        60
OIR    2025250     91400   18.3700 -109.3200      16.2        57       135        60
OIR    2025250     91400   18.3700 -109.3300      16.3        55       139        60
OIR    2025250     91400   18.3700 -110.8000      16.8        56       143        60
OIR    2025250     91400   18.3700 -110.8100      16.8        56       140        60
OIR    2025250     91400   18.3700 -110.8200      16.8        56       140        60
OIR    2025250     91400   18.3700 -110.8300      16.8        56       141        60
OIR    2025250     91400   18.3700 -111.2600      12.5        70       142        60
OIR    2025250     91400   18.3700 -111.2700      12.5        71       140        60
OIR    2025250     91400   18.3700 -111.2800      12.5        71       139        60
OIR    2025250     91400   18.3700 -111.2900      12.6        71       139        60
OIR    2025250     91400   18.3700 -111.3000      12.5        71       140        60
OIR    2025250     91400   18.3700 -111.3100      12.5        71       139        60
OIR    2025250     91400   18.3700 -111.3200      12.5        71       137        60
OIR    2025250     91400   18.3700 -111.3300      12.5        71       135        60
OIR    2025250     91400   18.3700 -111.3400      12.5        71       134        60
OIR    2025250     91400   18.3700 -111.3500      12.5        71       132        60
OIR    2025250     91400   18.3700 -111.3600      12.6        71       131        60
OIR    2025250     91400   18.3700 -111.3700      12.6        72       129        60
OIR    2025250     91400   18.3700 -111.3800      12.6        72       128        60
OIR    2025250     91400   18.3700 -111.3900      12.6        72       127        60
OIR    2025250     91400   18.3700 -111.4000      12.6        72       126        60
OIR    2025250     91400   18.3700 -111.4100      12.6        72       126        60
OIR    2025250     91400   18.3700 -111.4200      12.6        72       126        60
OIR    2025250     91400   18.3700 -111.4300      12.6        72       127        60
OIR    2025250     91400   18.3700 -111.4400      12.7        72       128        60
OIR    2025250     91400   18.3700 -111.4500      12.7        72       128        60
OIR    2025250     91400   18.3700 -111.4600      12.8        73       127        60
OIR    2025250     91400   18.3700 -111.4700      12.8        73       125        60
OIR    2025250     91400   18.3700 -111.4800      12.9        73       124        60
OIR    2025250     91400   18.3700 -111.4900      13.0        73       122        60
OIR    2025250     91400   18.3700 -111.5000      13.1        73       122        60
OIR    2025250     91400   18.3700 -111.5100      13.1        73       122        60
OIR    2025250     91400   18.3700 -111.5200      13.0        73       122        60
OIR    2025250     91400   18.3700 -111.5300      13.1        73       120        60
OIR    2025250     91400   18.3700 -111.5400      13.6        73       116        60
OIR    2025250     91400   18.3700 -111.5500      13.9        74       116        60
OIR    2025250     91400   18.3700 -111.5600      14.0        75       116        60
OIR    2025250     91400   18.3700 -111.5700      13.2        75       115        60
OIR    2025250     91400   18.3700 -111.5800      12.6        75       113        60
OIR    2025250     91400   18.3700 -111.5900      12.2        76       111        60
OIR    2025250     91400   18.3700 -111.6000      11.9        76       109        60
OIR    2025250     91400   18.3700 -111.6100      10.8        76       107        60
OIR    2025250     91400   18.3700 -111.6200      10.1        77       107        60
OIR    2025250     91400   18.3700 -111.6300      10.0        77       107        60
OIR    2025250     91400   18.3700 -111.6400      10.2        78       107        60
OIR    2025250     91400   18.3700 -111.6500      10.7        79       109        60
OIR    2025250     91400   18.3700 -111.6600      10.6        83       109        60
OIR    2025250     91400   18.3700 -111.6700      35.8       230       107        60
OIR    2025250     91400   18.3700 -111.6800      57.9       216       104        60
OIR    2025250     91400   18.3700 -111.7100      63.7       140       103        60
OIR    2025250     91400   18.3700 -111.7200      47.9       109       103        60
OIR    2025250     91400   18.3700 -111.7300      25.9        93       103        60
OIR    2025250     91400   18.3700 -111.7400       9.2        70       107        60
OIR    2025250     91400   18.3700 -111.7500       6.2        35       111        60
OIR    2025250     91400   18.3700 -111.7600       6.0        34       120        60
OIR    2025250     91400   18.3700 -111.7700       5.2        35       132        60
OIR    2025250     91400   18.3700 -111.8800       7.8        82       142        60
OIR    2025250     91400   18.3700 -111.8900       8.6        80       137        60
OIR    2025250     91400   18.3700 -111.9000       9.1        79       137        60
OIR    2025250     91400   18.3700 -111.9100       9.4        78       139        60
OIR    2025250     91400   18.3700 -111.9200       9.5        78       141        60
OIR    2025250     91400   18.3700 -111.9300       9.5        78       143        60
OIR    2025250     91400   18.3700 -112.5000       4.9       104       142        60
OIR    2025250     91400   18.3700 -112.5100       4.9       104       142        60
OIR    2025250     91400   18.3700 -112.5200       4.9       104       142        60
OIR    2025250     91400   18.3700 -112.5300       4.9       104       142        60
OIR    2025250     91400   18.3700 -112.5400       4.8       104       142        60
OIR    2025250     91400   18.3700 -112.5500       4.8       104       141        60
OIR    2025250     91400   18.3700 -112.5600       4.8       104       139        60
OIR    2025250     91400   18.3700 -112.5700       4.7       104       138        60
OIR    2025250     91400   18.3700 -112.5800       4.6       104       138        60
OIR    2025250     91400   18.3700 -112.5900       4.6       104       139        60
OIR    2025250     91400   18.3700 -112.6000       4.5       104       139        60
OIR    2025250     91400   18.3700 -112.6100       4.4       104       139        60
OIR    2025250     91400   18.3700 -112.6200       4.3       104       140        60
OIR    2025250     91400   18.3700 -112.6300       4.2       104       140        60
OIR    2025250     91400   18.3700 -112.6400       4.2       104       140        60
OIR    2025250     91400   18.3700 -112.6500       4.2       104       137        60
OIR    2025250     91400   18.3700 -112.6600       4.2       105       134        60
OIR    2025250     91400   18.3700 -112.6700       4.2       109       133        60
OIR    2025250     91400   18.3700 -112.6800       4.3       114       133        60
OIR    2025250     91400   18.3700 -112.6900       4.5       119       133        60
OIR    2025250     91400   18.3700 -112.7000       4.7       122       134        60
OIR    2025250     91400   18.3700 -112.7100       4.9       123       133        60
OIR    2025250     91400   18.3700 -112.7200       5.0       123       131        60
OIR    2025250     91400   18.3700 -112.7300       5.1       124       129        60
OIR    2025250     91400   18.3700 -112.7400       5.2       124       128        60
OIR    2025250     91400   18.3700 -112.7500       5.2       125       128        60
OIR    2025250     91400   18.3700 -112.7600       5.3       125       126        60
OIR    2025250     91400   18.3700 -112.7700       5.3       125       125        60
OIR    2025250     91400   18.3700 -112.7800       5.3       125       123        60
OIR    2025250     91400   18.3700 -112.7900       5.3       125       121        60
OIR    2025250     91400   18.3700 -112.8000       5.3       124       120        60
OIR    2025250     91400   18.3700 -112.8100       5.4       124       122        60
OIR    2025250     91400   18.3700 -112.8200       5.4       124       123        60
OIR    2025250     91400   18.3700 -112.8300       5.4       124       123        60
OIR    2025250     91400   18.3700 -112.8400       5.4       124       123        60
OIR    2025250     91400   18.3700 -112.8500       5.5       124       123        60
OIR    2025250     91400   18.3700 -112.8600       5.6       124       123        60
OIR    2025250     91400   18.3700 -112.8700       5.9       123       122        60
OIR    2025250     91400   18.3700 -112.8800       6.2       123       122        60
OIR    2025250     91400   18.3700 -112.8900       6.5       123       121        60
OIR    2025250     91400   18.3700 -112.9000       6.8       122       121        60
OIR    2025250     91400   18.3700 -112.9100       7.0       121       121        60
OIR    2025250     91400   18.3700 -112.9200       7.0       121       121        60
OIR    2025250     91400   18.3700 -112.9300       7.0       120       120        60
OIR    2025250     91400   18.3700 -112.9400       7.0       120       119        60
OIR    2025250     91400   18.3700 -112.9500       7.0       119       121        60
OIR    2025250     91400   18.3700 -112.9600       7.0       118       123        60
OIR    2025250     91400   18.3700 -112.9700       7.0       118       124        60
OIR    2025250     91400   18.3700 -112.9800       6.9       117       125        60
OIR    2025250     91400   18.3700 -112.9900       6.7       116       127        60
OIR    2025250     91400   18.3700 -113.0000       6.5       114       128        60
OIR    2025250     91400   18.3700 -113.0100       6.3       112       130        60
OIR    2025250     91400   18.3700 -113.0200       5.9       110       133        60
OIR    2025250     91400   18.3700 -113.0300       5.7       109       135        60
OIR    2025250     91400   18.3700 -113.0400       5.4       107       135        60
OIR    2025250     91400   18.3700 -113.0500       5.0       105       135        60
OIR    2025250     91400   18.3700 -113.0600       4.7       103       137        60
OIR    2025250     91400   18.3700 -113.0700       4.6       101       139        60
OIR    2025250     91400   18.3700 -113.0800       4.5       100       141        60
OIR    2025250     91400   18.3700 -113.1100       4.5       100       142        60
OIR    2025250     91400   18.3700 -113.1200       4.6       100       139        60
OIR    2025250     91400   18.3700 -113.1300       4.5       100       137        60
OIR    2025250     91400   18.3700 -113.1400       4.4       103       137        60
OIR    2025250     91400   18.3700 -113.1500       4.1       106       136        60
OIR    2025250     91400   18.3700 -113.3700       6.1        97       143        60
OIR    2025250     91400   18.3700 -113.9800       4.6       160       142        60
OIR    2025250     91400   18.3700 -113.9900       4.5       160       138        60
OIR    2025250     91400   18.3700 -114.0000       4.5       160       134        60
OIR    2025250     91400   18.3700 -114.0100       4.5       160       130        60
OIR    2025250     91400   18.3700 -114.0200       4.5       160       131        60
OIR    2025250     91400   18.3700 -114.0300       4.5       159       132        60
OIR    2025250     91400   18.3700 -114.0400       4.5       159       133        60
OIR    2025250     91400   18.3700 -114.0500       4.2       162       131        60
OIR    2025250     91400   18.3700 -114.0800       4.0       174       126        60
OIR    2025250     91400   18.3700 -114.0900       4.6       178       127        60
OIR    2025250     91400   18.3700 -114.1000       5.7       181       128        60
OIR    2025250     91400   18.3700 -114.1100       6.8       183       129        60
OIR    2025250     91400   18.3700 -114.1200       7.0       183       129        60
OIR    2025250     91400   18.3700 -114.1300       6.4       182       129        60
OIR    2025250     91400   18.3700 -114.1400       6.8       182       128        60
OIR    2025250     91400   18.3700 -114.1500       7.7       182       128        60
OIR    2025250     91400   18.3700 -114.1600       8.1       180       129        60
OIR    2025250     91400   18.3700 -114.1700       8.1       179       131        60
OIR    2025250     91400   18.3700 -114.1800       7.9       178       129        60
OIR    2025250     91400   18.3700 -114.1900       7.7       179       128        60
OIR    2025250     91400   18.3700 -114.2000       7.6       180       127        60
OIR    2025250     91400   18.3700 -114.2100       7.8       181       127        60
OIR    2025250     91400   18.3700 -114.2200       8.2       184       126        60
OIR    2025250     91400   18.3700 -114.2300       8.9       187       127        60
OIR    2025250     91400   18.3700 -114.2400       9.2       190       128        60
OIR    2025250     91400   18.3700 -114.2500       9.4       193       129        60
OIR    2025250     91400   18.3700 -114.2600       9.1       198       130        60
OIR    2025250     91400   18.3700 -114.2700       7.9       208       133        60
OIR    2025250     91400   18.3700 -114.2800       7.9       215       135        60
OIR    2025250     91400   18.3700 -114.2900       7.9       216       136        60
OIR    2025250     91400   18.3700 -114.3000       8.0       216       136        60
OIR    2025250     91400   18.3700 -114.3100       7.6       216       137        60
OIR    2025250     91400   18.3700 -114.3200       7.0       220       142        60
OIR    2025250     91400   18.3600 -108.6100      14.1        53       128        60
OIR    2025250     91400   18.3600 -108.6200      14.1        53       130        60
OIR    2025250     91400   18.3600 -108.6300      14.1        53       132        60
OIR    2025250     91400   18.3600 -108.6400      14.1        53       135        60
OIR    2025250     91400   18.3600 -108.6500      14.1        53       140        60
OIR    2025250     91400   18.3600 -108.6600      14.0        53       142        60
OIR    2025250     91400   18.3600 -108.7000      14.0        53       142        60
OIR    2025250     91400   18.3600 -108.7100      14.0        53       139        60
OIR    2025250     91400   18.3600 -108.7200      14.1        53       135        60
OIR    2025250     91400   18.3600 -108.7300      14.1        54       131        60
OIR    2025250     91400   18.3600 -108.7400      14.2        55       126        60
OIR    2025250     91400   18.3600 -108.7500      14.1        57       121        60
OIR    2025250     91400   18.3600 -108.7600      14.1        58       117        60
OIR    2025250     91400   18.3600 -108.7700      14.1        58       116        60
OIR    2025250     91400   18.3600 -108.7800      14.1        58       116        60
OIR    2025250     91400   18.3600 -108.7900      14.2        59       114        60
OIR    2025250     91400   18.3600 -108.8000      14.2        59       112        60
OIR    2025250     91400   18.3600 -108.8100      14.3        59       111        60
OIR    2025250     91400   18.3600 -108.8200      14.3        59       111        60
OIR    2025250     91400   18.3600 -108.8300      14.4        59       111        60
OIR    2025250     91400   18.3600 -108.8400      14.4        59       111        60
OIR    2025250     91400   18.3600 -108.8500      14.4        59       111        60
OIR    2025250     91400   18.3600 -108.8600      14.4        59       111        60
OIR    2025250     91400   18.3600 -108.8700      14.5        59       112        60
OIR    2025250     91400   18.3600 -108.8800      14.5        59       112        60
OIR    2025250     91400   18.3600 -108.8900      14.5        59       112        60
OIR    2025250     91400   18.3600 -108.9000      14.5        59       112        60
OIR    2025250     91400   18.3600 -108.9100      14.5        59       114        60
OIR    2025250     91400   18.3600 -108.9200      14.5        59       116        60
OIR    2025250     91400   18.3600 -108.9300      14.5        59       116        60
OIR    2025250     91400   18.3600 -108.9400      14.5        59       113        60
OIR    2025250     91400   18.3600 -108.9500      14.6        59       110        60
OIR    2025250     91400   18.3600 -108.9600      14.6        59       112        60
OIR    2025250     91400   18.3600 -108.9700      14.6        59       114        60
OIR    2025250     91400   18.3600 -108.9800      14.6        59       115        60
OIR    2025250     91400   18.3600 -108.9900      14.6        59       115        60
OIR    2025250     91400   18.3600 -109.0000      14.6        59       115        60
OIR    2025250     91400   18.3600 -109.0100      14.7        59       116        60
OIR    2025250     91400   18.3600 -109.0200      14.7        58       116        60
OIR    2025250     91400   18.3600 -109.0300      14.8        58       116        60
OIR    2025250     91400   18.3600 -109.0400      14.8        58       116        60
OIR    2025250     91400   18.3600 -109.0500      14.8        58       115        60
OIR    2025250     91400   18.3600 -109.0600      14.9        58       113        60
OIR    2025250     91400   18.3600 -109.0700      15.0        58       112        60
OIR    2025250     91400   18.3600 -109.0800      15.1        57       111        60
OIR    2025250     91400   18.3600 -109.0900      15.2        57       111        60
OIR    2025250     91400   18.3600 -109.1000      15.2        57       111        60
OIR    2025250     91400   18.3600 -109.1100      15.2        57       111        60
OIR    2025250     91400   18.3600 -109.1200      15.2        57       111        60
OIR    2025250     91400   18.3600 -109.1300      15.2        57       110        60
OIR    2025250     91400   18.3600 -109.1400      15.3        57       109        60
OIR    2025250     91400   18.3600 -109.1500      15.3        57       109        60
OIR    2025250     91400   18.3600 -109.1600      15.3        57       109        60
OIR    2025250     91400   18.3600 -109.1700      15.3        57       108        60
OIR    2025250     91400   18.3600 -109.1800      15.3        57       109        60
OIR    2025250     91400   18.3600 -109.1900      15.4        57       111        60
OIR    2025250     91400   18.3600 -109.2000      15.4        57       113        60
OIR    2025250     91400   18.3600 -109.2100      15.4        57       115        60
OIR    2025250     91400   18.3600 -109.2200      15.4        58       116        60
OIR    2025250     91400   18.3600 -109.2300      15.5        58       121        60
OIR    2025250     91400   18.3600 -109.2400      15.5        58       124        60
OIR    2025250     91400   18.3600 -109.2500      15.8        57       126        60
OIR    2025250     91400   18.3600 -109.2600      15.9        57       126        60
OIR    2025250     91400   18.3600 -109.2700      16.1        58       126        60
OIR    2025250     91400   18.3600 -109.2800      16.3        57       126        60
OIR    2025250     91400   18.3600 -109.2900      16.4        57       126        60
OIR    2025250     91400   18.3600 -109.3000      16.1        58       126        60
OIR    2025250     91400   18.3600 -109.3100      16.5        58       125        60
OIR    2025250     91400   18.3600 -109.3200      17.0        57       125        60
OIR    2025250     91400   18.3600 -109.3300      16.8        56       128        60
OIR    2025250     91400   18.3600 -109.3400      16.3        56       132        60
OIR    2025250     91400   18.3600 -110.8100      16.8        56       141        60
OIR    2025250     91400   18.3600 -110.8200      16.7        56       141        60
OIR    2025250     91400   18.3600 -110.8300      16.7        55       141        60
OIR    2025250     91400   18.3600 -110.8400      16.7        55       142        60
OIR    2025250     91400   18.3600 -111.2600      12.5        70       142        60
OIR    2025250     91400   18.3600 -111.2700      12.5        71       141        60
OIR    2025250     91400   18.3600 -111.2800      12.5        71       139        60
OIR    2025250     91400   18.3600 -111.2900      12.5        71       138        60
OIR    2025250     91400   18.3600 -111.3000      12.5        71       139        60
OIR    2025250     91400   18.3600 -111.3100      12.5        71       138        60
OIR    2025250     91400   18.3600 -111.3200      12.5        71       136        60
OIR    2025250     91400   18.3600 -111.3300      12.5        71       134        60
OIR    2025250     91400   18.3600 -111.3400      12.5        71       132        60
OIR    2025250     91400   18.3600 -111.3500      12.5        71       131        60
OIR    2025250     91400   18.3600 -111.3600      12.5        71       130        60
OIR    2025250     91400   18.3600 -111.3700      12.5        72       129        60
OIR    2025250     91400   18.3600 -111.3800      12.5        72       128        60
OIR    2025250     91400   18.3600 -111.3900      12.6        72       128        60
OIR    2025250     91400   18.3600 -111.4000      12.6        72       128        60
OIR    2025250     91400   18.3600 -111.4100      12.6        72       129        60
OIR    2025250     91400   18.3600 -111.4200      12.6        72       130        60
OIR    2025250     91400   18.3600 -111.4300      12.6        72       130        60
OIR    2025250     91400   18.3600 -111.4400      12.6        72       129        60
OIR    2025250     91400   18.3600 -111.4500      12.6        73       129        60
OIR    2025250     91400   18.3600 -111.4600      12.7        73       129        60
OIR    2025250     91400   18.3600 -111.4700      12.7        73       128        60
OIR    2025250     91400   18.3600 -111.4800      12.7        73       126        60
OIR    2025250     91400   18.3600 -111.4900      12.7        73       124        60
OIR    2025250     91400   18.3600 -111.5000      12.7        73       122        60
OIR    2025250     91400   18.3600 -111.5100      12.7        73       122        60
OIR    2025250     91400   18.3600 -111.5200      12.7        73       123        60
OIR    2025250     91400   18.3600 -111.5300      12.7        73       122        60
OIR    2025250     91400   18.3600 -111.5400      12.8        73       121        60
OIR    2025250     91400   18.3600 -111.5500      12.9        73       117        60
OIR    2025250     91400   18.3600 -111.5600      12.9        73       115        60
OIR    2025250     91400   18.3600 -111.5700      12.5        74       113        60
OIR    2025250     91400   18.3600 -111.5800      12.3        74       113        60
OIR    2025250     91400   18.3600 -111.5900      12.0        74       112        60
OIR    2025250     91400   18.3600 -111.6000      11.7        75       108        60
OIR    2025250     91400   18.3600 -111.6100      10.6        75       104        60
OIR    2025250     91400   18.3600 -111.6200      10.0        75       104        60
OIR    2025250     91400   18.3600 -111.6300       9.8        75       104        60
OIR    2025250     91400   18.3600 -111.6400       9.8        76       104        60
OIR    2025250     91400   18.3600 -111.6500      10.3        77       108        60
OIR    2025250     91400   18.3600 -111.6600      10.5        77       110        60
OIR    2025250     91400   18.3600 -111.6700       6.6       154       108        60
OIR    2025250     91400   18.3600 -111.6800      43.1       201       105        60
OIR    2025250     91400   18.3600 -111.6900      48.4       186       104        60
OIR    2025250     91400   18.3600 -111.7000      49.1       161       104        60
OIR    2025250     91400   18.3600 -111.7100      42.8       147       104        60
OIR    2025250     91400   18.3600 -111.7200      28.1       120       104        60
OIR    2025250     91400   18.3600 -111.7300      16.3        98       104        60
OIR    2025250     91400   18.3600 -111.7400       4.5        59       109        60
OIR    2025250     91400   18.3600 -111.8900       8.5        79       139        60
OIR    2025250     91400   18.3600 -111.9000       9.0        79       138        60
OIR    2025250     91400   18.3600 -111.9100       9.4        78       140        60
OIR    2025250     91400   18.3600 -111.9200       9.5        78       141        60
OIR    2025250     91400   18.3600 -112.2700      11.9        90       141        60
OIR    2025250     91400   18.3600 -112.3100      11.6        91       139        60
OIR    2025250     91400   18.3600 -112.3200      11.3        92       139        60
OIR    2025250     91400   18.3600 -112.4900       5.1       107       141        60
OIR    2025250     91400   18.3600 -112.5000       5.0       106       139        60
OIR    2025250     91400   18.3600 -112.5100       4.9       105       138        60
OIR    2025250     91400   18.3600 -112.5200       4.9       104       138        60
OIR    2025250     91400   18.3600 -112.5300       4.9       104       138        60
OIR    2025250     91400   18.3600 -112.5400       4.9       104       138        60
OIR    2025250     91400   18.3600 -112.5500       4.8       104       138        60
OIR    2025250     91400   18.3600 -112.5600       4.8       105       138        60
OIR    2025250     91400   18.3600 -112.5700       4.7       106       138        60
OIR    2025250     91400   18.3600 -112.5800       4.7       106       137        60
OIR    2025250     91400   18.3600 -112.5900       4.6       106       136        60
OIR    2025250     91400   18.3600 -112.6000       4.5       105       136        60
OIR    2025250     91400   18.3600 -112.6100       4.4       105       136        60
OIR    2025250     91400   18.3600 -112.6200       4.3       105       137        60
OIR    2025250     91400   18.3600 -112.6300       4.3       105       138        60
OIR    2025250     91400   18.3600 -112.6400       4.3       105       139        60
OIR    2025250     91400   18.3600 -112.6500       4.2       106       136        60
OIR    2025250     91400   18.3600 -112.6600       4.3       109       133        60
OIR    2025250     91400   18.3600 -112.6700       4.4       112       132        60
OIR    2025250     91400   18.3600 -112.6800       4.5       117       132        60
OIR    2025250     91400   18.3600 -112.6900       4.6       120       132        60
OIR    2025250     91400   18.3600 -112.7000       4.8       122       132        60
OIR    2025250     91400   18.3600 -112.7100       4.9       123       132        60
OIR    2025250     91400   18.3600 -112.7200       5.0       124       130        60
OIR    2025250     91400   18.3600 -112.7300       5.1       124       129        60
OIR    2025250     91400   18.3600 -112.7400       5.2       125       128        60
OIR    2025250     91400   18.3600 -112.7500       5.2       125       128        60
OIR    2025250     91400   18.3600 -112.7600       5.3       125       127        60
OIR    2025250     91400   18.3600 -112.7700       5.3       125       125        60
OIR    2025250     91400   18.3600 -112.7800       5.3       125       124        60
OIR    2025250     91400   18.3600 -112.7900       5.3       125       123        60
OIR    2025250     91400   18.3600 -112.8000       5.3       125       121        60
OIR    2025250     91400   18.3600 -112.8100       5.4       124       122        60
OIR    2025250     91400   18.3600 -112.8200       5.4       124       123        60
OIR    2025250     91400   18.3600 -112.8300       5.4       124       123        60
OIR    2025250     91400   18.3600 -112.8400       5.5       124       122        60
OIR    2025250     91400   18.3600 -112.8500       5.6       124       122        60
OIR    2025250     91400   18.3600 -112.8600       5.9       123       121        60
OIR    2025250     91400   18.3600 -112.8700       6.2       123       121        60
OIR    2025250     91400   18.3600 -112.8800       6.6       123       121        60
OIR    2025250     91400   18.3600 -112.8900       6.8       122       121        60
OIR    2025250     91400   18.3600 -112.9000       7.0       122       121        60
OIR    2025250     91400   18.3600 -112.9100       7.1       121       121        60
OIR    2025250     91400   18.3600 -112.9200       7.1       121       121        60
OIR    2025250     91400   18.3600 -112.9300       7.1       120       121        60
OIR    2025250     91400   18.3600 -112.9400       7.1       120       121        60
OIR    2025250     91400   18.3600 -112.9500       7.1       120       122        60
OIR    2025250     91400   18.3600 -112.9600       7.1       119       123        60
OIR    2025250     91400   18.3600 -112.9700       7.0       118       124        60
OIR    2025250     91400   18.3600 -112.9800       7.0       117       125        60
OIR    2025250     91400   18.3600 -112.9900       6.9       117       126        60
OIR    2025250     91400   18.3600 -113.0000       6.7       115       128        60
OIR    2025250     91400   18.3600 -113.0100       6.4       113       130        60
OIR    2025250     91400   18.3600 -113.0200       6.1       112       133        60
OIR    2025250     91400   18.3600 -113.0300       5.8       111       136        60
OIR    2025250     91400   18.3600 -113.0400       5.5       109       136        60
OIR    2025250     91400   18.3600 -113.0500       5.2       107       136        60
OIR    2025250     91400   18.3600 -113.0600       4.8       104       137        60
OIR    2025250     91400   18.3600 -113.0700       4.6       102       140        60
OIR    2025250     91400   18.3600 -113.0800       4.6       101       142        60
OIR    2025250     91400   18.3600 -113.0900       4.6       100       143        60
OIR    2025250     91400   18.3600 -113.1100       4.6       100       142        60
OIR    2025250     91400   18.3600 -113.1200       4.6        99       140        60
OIR    2025250     91400   18.3600 -113.1300       4.6        99       138        60
OIR    2025250     91400   18.3600 -113.1400       4.4        99       135        60
OIR    2025250     91400   18.3600 -113.1500       4.1        99       134        60
OIR    2025250     91400   18.3600 -113.9900       4.5       160       139        60
OIR    2025250     91400   18.3600 -114.0000       4.5       160       136        60
OIR    2025250     91400   18.3600 -114.0100       4.5       160       133        60
OIR    2025250     91400   18.3600 -114.0200       4.5       160       132        60
OIR    2025250     91400   18.3600 -114.0300       4.5       159       133        60
OIR    2025250     91400   18.3600 -114.0400       4.4       159       133        60
OIR    2025250     91400   18.3600 -114.1700       4.4       179       127        60
OIR    2025250     91400   18.3600 -114.1800       4.7       178       127        60
OIR    2025250     91400   18.3600 -114.1900       4.6       178       127        60
OIR    2025250     91400   18.3600 -114.2000       4.6       182       127        60
OIR    2025250     91400   18.3600 -114.2100       5.2       181       125        60
OIR    2025250     91400   18.3600 -114.2200       6.0       181       124        60
OIR    2025250     91400   18.3600 -114.2300       7.0       184       124        60
OIR    2025250     91400   18.3600 -114.2400       7.5       189       124        60
OIR    2025250     91400   18.3600 -114.2500       7.4       194       125        60
OIR    2025250     91400   18.3600 -114.2600       6.7       200       127        60
OIR    2025250     91400   18.3600 -114.2700       6.3       211       129        60
OIR    2025250     91400   18.3600 -114.2800       7.0       219       132        60
OIR    2025250     91400   18.3600 -114.2900       7.2       220       134        60
OIR    2025250     91400   18.3600 -114.3000       7.2       220       134        60
OIR    2025250     91400   18.3600 -114.3100       6.9       222       135        60
OIR    2025250     91400   18.3600 -114.3200       6.6       229       140        60
OIR    2025250     91400   18.3500 -108.6100      14.1        53       129        60
OIR    2025250     91400   18.3500 -108.6200      14.1        53       130        60
OIR    2025250     91400   18.3500 -108.6300      14.1        53       131        60
OIR    2025250     91400   18.3500 -108.6400      14.1        53       133        60
OIR    2025250     91400   18.3500 -108.6500      14.1        53       137        60
OIR    2025250     91400   18.3500 -108.6600      14.0        53       139        60
OIR    2025250     91400   18.3500 -108.6700      14.0        53       141        60
OIR    2025250     91400   18.3500 -108.6800      14.0        53       143        60
OIR    2025250     91400   18.3500 -108.6900      14.0        53       142        60
OIR    2025250     91400   18.3500 -108.7000      14.0        53       140        60
OIR    2025250     91400   18.3500 -108.7100      14.0        54       138        60
OIR    2025250     91400   18.3500 -108.7200      14.1        55       135        60
OIR    2025250     91400   18.3500 -108.7300      14.1        55       133        60
OIR    2025250     91400   18.3500 -108.7400      14.1        57       129        60
OIR    2025250     91400   18.3500 -108.7500      14.1        58       124        60
OIR    2025250     91400   18.3500 -108.7600      14.1        58       121        60
OIR    2025250     91400   18.3500 -108.7700      14.1        58       120        60
OIR    2025250     91400   18.3500 -108.7800      14.1        59       119        60
OIR    2025250     91400   18.3500 -108.7900      14.1        59       117        60
OIR    2025250     91400   18.3500 -108.8000      14.1        59       116        60
OIR    2025250     91400   18.3500 -108.8100      14.2        59       116        60
OIR    2025250     91400   18.3500 -108.8200      14.2        59       116        60
OIR    2025250     91400   18.3500 -108.8300      14.3        59       115        60
OIR    2025250     91400   18.3500 -108.8400      14.4        59       115        60
OIR    2025250     91400   18.3500 -108.8500      14.4        59       115        60
OIR    2025250     91400   18.3500 -108.8600      14.4        59       115        60
OIR    2025250     91400   18.3500 -108.8700      14.4        59       115        60
OIR    2025250     91400   18.3500 -108.8800      14.5        59       115        60
OIR    2025250     91400   18.3500 -108.8900      14.5        59       116        60
OIR    2025250     91400   18.3500 -108.9000      14.5        59       116        60
OIR    2025250     91400   18.3500 -108.9100      14.5        59       116        60
OIR    2025250     91400   18.3500 -108.9200      14.5        59       117        60
OIR    2025250     91400   18.3500 -108.9300      14.5        59       119        60
OIR    2025250     91400   18.3500 -108.9400      14.5        59       117        60
OIR    2025250     91400   18.3500 -108.9500      14.5        59       116        60
OIR    2025250     91400   18.3500 -108.9600      14.6        59       116        60
OIR    2025250     91400   18.3500 -108.9700      14.6        59       116        60
OIR    2025250     91400   18.3500 -108.9800      14.6        59       117        60
OIR    2025250     91400   18.3500 -108.9900      14.6        59       117        60
OIR    2025250     91400   18.3500 -109.0000      14.6        59       117        60
OIR    2025250     91400   18.3500 -109.0100      14.6        59       119        60
OIR    2025250     91400   18.3500 -109.0200      14.7        59       119        60
OIR    2025250     91400   18.3500 -109.0300      14.7        58       120        60
OIR    2025250     91400   18.3500 -109.0400      14.8        58       117        60
OIR    2025250     91400   18.3500 -109.0500      14.8        58       116        60
OIR    2025250     91400   18.3500 -109.0600      14.9        58       116        60
OIR    2025250     91400   18.3500 -109.0700      15.0        58       115        60
OIR    2025250     91400   18.3500 -109.0800      15.1        57       114        60
OIR    2025250     91400   18.3500 -109.0900      15.2        57       114        60
OIR    2025250     91400   18.3500 -109.1000      15.2        57       114        60
OIR    2025250     91400   18.3500 -109.1100      15.2        57       114        60
OIR    2025250     91400   18.3500 -109.1200      15.2        57       114        60
OIR    2025250     91400   18.3500 -109.1300      15.2        57       113        60
OIR    2025250     91400   18.3500 -109.1400      15.3        57       112        60
OIR    2025250     91400   18.3500 -109.1500      15.3        57       111        60
OIR    2025250     91400   18.3500 -109.1600      15.3        57       111        60
OIR    2025250     91400   18.3500 -109.1700      15.3        57       110        60
OIR    2025250     91400   18.3500 -109.1800      15.3        57       110        60
OIR    2025250     91400   18.3500 -109.1900      15.4        57       111        60
OIR    2025250     91400   18.3500 -109.2000      15.4        57       113        60
OIR    2025250     91400   18.3500 -109.2100      15.4        57       114        60
OIR    2025250     91400   18.3500 -109.2200      15.4        58       116        60
OIR    2025250     91400   18.3500 -109.2300      15.5        58       119        60
OIR    2025250     91400   18.3500 -109.2400      15.6        58       122        60
OIR    2025250     91400   18.3500 -109.2500      15.8        57       125        60
OIR    2025250     91400   18.3500 -109.2600      16.0        57       125        60
OIR    2025250     91400   18.3500 -109.2700      16.4        58       125        60
OIR    2025250     91400   18.3500 -109.2800      16.8        57       124        60
OIR    2025250     91400   18.3500 -109.2900      17.6        56       123        60
OIR    2025250     91400   18.3500 -109.3000      18.1        56       121        60
OIR    2025250     91400   18.3500 -109.3100      17.8        57       119        60
OIR    2025250     91400   18.3500 -109.3200      18.2        57       116        60
OIR    2025250     91400   18.3500 -109.3300      18.9        57       119        60
OIR    2025250     91400   18.3500 -109.3400      18.0        57       123        60
OIR    2025250     91400   18.3500 -109.3500      18.0        58       133        60
OIR    2025250     91400   18.3500 -110.8100      16.7        55       143        60
OIR    2025250     91400   18.3500 -110.8200      16.7        55       142        60
OIR    2025250     91400   18.3500 -110.8300      16.7        55       141        60
OIR    2025250     91400   18.3500 -110.8400      16.7        55       141        60
OIR    2025250     91400   18.3500 -111.2700      12.5        71       141        60
OIR    2025250     91400   18.3500 -111.2800      12.5        71       139        60
OIR    2025250     91400   18.3500 -111.2900      12.5        71       138        60
OIR    2025250     91400   18.3500 -111.3000      12.5        71       137        60
OIR    2025250     91400   18.3500 -111.3100      12.5        71       137        60
OIR    2025250     91400   18.3500 -111.3200      12.5        71       134        60
OIR    2025250     91400   18.3500 -111.3300      12.5        71       131        60
OIR    2025250     91400   18.3500 -111.3400      12.5        71       130        60
OIR    2025250     91400   18.3500 -111.3500      12.5        71       128        60
OIR    2025250     91400   18.3500 -111.3600      12.5        71       127        60
OIR    2025250     91400   18.3500 -111.3700      12.5        72       127        60
OIR    2025250     91400   18.3500 -111.3800      12.5        72       128        60
OIR    2025250     91400   18.3500 -111.3900      12.5        72       125        60
OIR    2025250     91400   18.3500 -111.4000      12.5        72       123        60
OIR    2025250     91400   18.3500 -111.4100      12.6        72       125        60
OIR    2025250     91400   18.3500 -111.4200      12.6        72       127        60
OIR    2025250     91400   18.3500 -111.4300      12.6        72       129        60
OIR    2025250     91400   18.3500 -111.4400      12.6        73       129        60
OIR    2025250     91400   18.3500 -111.4500      12.6        73       129        60
OIR    2025250     91400   18.3500 -111.4600      12.6        73       127        60
OIR    2025250     91400   18.3500 -111.4700      12.6        73       125        60
OIR    2025250     91400   18.3500 -111.4800      12.6        73       123        60
OIR    2025250     91400   18.3500 -111.4900      12.6        73       120        60
OIR    2025250     91400   18.3500 -111.5000      12.6        73       117        60
OIR    2025250     91400   18.3500 -111.5100      12.6        73       119        60
OIR    2025250     91400   18.3500 -111.5200      12.6        73       121        60
OIR    2025250     91400   18.3500 -111.5300      12.5        73       121        60
OIR    2025250     91400   18.3500 -111.5400      12.5        73       121        60
OIR    2025250     91400   18.3500 -111.5500      12.5        73       119        60
OIR    2025250     91400   18.3500 -111.5600      12.5        73       115        60
OIR    2025250     91400   18.3500 -111.5700      12.3        74       113        60
OIR    2025250     91400   18.3500 -111.5800      12.2        74       112        60
OIR    2025250     91400   18.3500 -111.5900      12.0        74       111        60
OIR    2025250     91400   18.3500 -111.6000      11.7        74       109        60
OIR    2025250     91400   18.3500 -111.6100      10.2        74       105        60
OIR    2025250     91400   18.3500 -111.6200       9.9        74       104        60
OIR    2025250     91400   18.3500 -111.6300       9.5        75       104        60
OIR    2025250     91400   18.3500 -111.6400       9.3        75       104        60
OIR    2025250     91400   18.3500 -111.6500       9.3        76       107        60
OIR    2025250     91400   18.3500 -111.6600       8.7        76       109        60
OIR    2025250     91400   18.3500 -111.6700       8.6        75       109        60
OIR    2025250     91400   18.3500 -111.6800       7.8        79       108        60
OIR    2025250     91400   18.3500 -111.6900       7.4       125       107        60
OIR    2025250     91400   18.3500 -111.7000       9.3       132       105        60
OIR    2025250     91400   18.3500 -111.7100       7.0       111       104        60
OIR    2025250     91400   18.3500 -111.7200       6.3       102       105        60
OIR    2025250     91400   18.3500 -111.8900       8.4        80       142        60
OIR    2025250     91400   18.3500 -111.9000       9.0        79       140        60
OIR    2025250     91400   18.3500 -111.9100       9.4        78       141        60
OIR    2025250     91400   18.3500 -111.9200       9.5        78       142        60
OIR    2025250     91400   18.3500 -112.2600      12.0        89       142        60
OIR    2025250     91400   18.3500 -112.2700      12.0        89       139        60
OIR    2025250     91400   18.3500 -112.2800      11.9        89       141        60
OIR    2025250     91400   18.3500 -112.3100      11.7        90       139        60
OIR    2025250     91400   18.3500 -112.3200      11.5        91       137        60
OIR    2025250     91400   18.3500 -112.3300      11.1        92       142        60
OIR    2025250     91400   18.3500 -112.4900       5.2       111       140        60
OIR    2025250     91400   18.3500 -112.5000       5.1       110       137        60
OIR    2025250     91400   18.3500 -112.5100       5.0       109       135        60
OIR    2025250     91400   18.3500 -112.5200       5.0       108       134        60
OIR    2025250     91400   18.3500 -112.5300       4.9       106       134        60
OIR    2025250     91400   18.3500 -112.5400       4.9       106       133        60
OIR    2025250     91400   18.3500 -112.5500       4.9       106       134        60
OIR    2025250     91400   18.3500 -112.5600       4.8       107       135        60
OIR    2025250     91400   18.3500 -112.5700       4.8       108       137        60
OIR    2025250     91400   18.3500 -112.5800       4.8       108       137        60
OIR    2025250     91400   18.3500 -112.5900       4.7       108       135        60
OIR    2025250     91400   18.3500 -112.6000       4.6       107       134        60
OIR    2025250     91400   18.3500 -112.6100       4.5       107       134        60
OIR    2025250     91400   18.3500 -112.6200       4.4       107       135        60
OIR    2025250     91400   18.3500 -112.6300       4.4       107       135        60
OIR    2025250     91400   18.3500 -112.6400       4.4       108       135        60
OIR    2025250     91400   18.3500 -112.6500       4.4       110       134        60
OIR    2025250     91400   18.3500 -112.6600       4.5       113       133        60
OIR    2025250     91400   18.3500 -112.6700       4.6       116       132        60
OIR    2025250     91400   18.3500 -112.6800       4.7       118       131        60
OIR    2025250     91400   18.3500 -112.6900       4.8       121       131        60
OIR    2025250     91400   18.3500 -112.7000       4.9       123       131        60
OIR    2025250     91400   18.3500 -112.7100       5.0       124       131        60
OIR    2025250     91400   18.3500 -112.7200       5.1       124       130        60
OIR    2025250     91400   18.3500 -112.7300       5.1       125       129        60
OIR    2025250     91400   18.3500 -112.7400       5.2       125       129        60
OIR    2025250     91400   18.3500 -112.7500       5.2       125       128        60
OIR    2025250     91400   18.3500 -112.7600       5.2       125       127        60
OIR    2025250     91400   18.3500 -112.7700       5.3       125       126        60
OIR    2025250     91400   18.3500 -112.7800       5.3       125       124        60
OIR    2025250     91400   18.3500 -112.7900       5.3       125       123        60
OIR    2025250     91400   18.3500 -112.8000       5.3       125       122        60
OIR    2025250     91400   18.3500 -112.8100       5.4       125       121        60
OIR    2025250     91400   18.3500 -112.8200       5.4       124       121        60
OIR    2025250     91400   18.3500 -112.8300       5.4       124       121        60
OIR    2025250     91400   18.3500 -112.8400       5.6       124       121        60
OIR    2025250     91400   18.3500 -112.8500       5.8       124       120        60
OIR    2025250     91400   18.3500 -112.8600       6.1       123       120        60
OIR    2025250     91400   18.3500 -112.8700       6.5       122       120        60
OIR    2025250     91400   18.3500 -112.8800       6.8       122       120        60
OIR    2025250     91400   18.3500 -112.8900       7.0       122       120        60
OIR    2025250     91400   18.3500 -112.9000       7.1       122       121        60
OIR    2025250     91400   18.3500 -112.9100       7.1       121       121        60
OIR    2025250     91400   18.3500 -112.9200       7.2       121       122        60
OIR    2025250     91400   18.3500 -112.9300       7.2       121       121        60
OIR    2025250     91400   18.3500 -112.9400       7.2       120       121        60
OIR    2025250     91400   18.3500 -112.9500       7.2       120       122        60
OIR    2025250     91400   18.3500 -112.9600       7.1       119       123        60
OIR    2025250     91400   18.3500 -112.9700       7.1       119       124        60
OIR    2025250     91400   18.3500 -112.9800       7.1       118       125        60
OIR    2025250     91400   18.3500 -112.9900       7.0       117       126        60
OIR    2025250     91400   18.3500 -113.0000       6.9       116       127        60
OIR    2025250     91400   18.3500 -113.0100       6.6       115       128        60
OIR    2025250     91400   18.3500 -113.0200       6.3       113       132        60
OIR    2025250     91400   18.3500 -113.0300       6.0       112       136        60
OIR    2025250     91400   18.3500 -113.0400       5.8       111       137        60
OIR    2025250     91400   18.3500 -113.0500       5.5       109       138        60
OIR    2025250     91400   18.3500 -113.0600       5.1       106       138        60
OIR    2025250     91400   18.3500 -113.0700       4.8       104       140        60
OIR    2025250     91400   18.3500 -113.0800       4.7       102       142        60
OIR    2025250     91400   18.3500 -113.0900       4.7       101       142        60
OIR    2025250     91400   18.3500 -113.1000       4.7       100       142        60
OIR    2025250     91400   18.3500 -113.1100       4.7        99       142        60
OIR    2025250     91400   18.3500 -113.1200       4.7        98       141        60
OIR    2025250     91400   18.3500 -113.1300       4.6        98       138        60
OIR    2025250     91400   18.3500 -113.1400       4.5        97       134        60
OIR    2025250     91400   18.3500 -113.1500       4.1        96       131        60
OIR    2025250     91400   18.3500 -113.9800       4.5       161       142        60
OIR    2025250     91400   18.3500 -113.9900       4.5       160       138        60
OIR    2025250     91400   18.3500 -114.0000       4.5       160       135        60
OIR    2025250     91400   18.3500 -114.0100       4.5       160       135        60
OIR    2025250     91400   18.3500 -114.0200       4.5       159       135        60
OIR    2025250     91400   18.3500 -114.0300       4.4       158       136        60
OIR    2025250     91400   18.3500 -114.2800       4.5       229       131        60
OIR    2025250     91400   18.3500 -114.2900       6.4       224       134        60
OIR    2025250     91400   18.3500 -114.3000       6.7       223       135        60
OIR    2025250     91400   18.3500 -114.3100       6.7       226       136        60
OIR    2025250     91400   18.3500 -114.3200       6.6       231       141        60
OIR    2025250     91400   18.3400 -108.6100      14.1        53       134        60
OIR    2025250     91400   18.3400 -108.6200      14.1        53       133        60
OIR    2025250     91400   18.3400 -108.6300      14.1        53       134        60
OIR    2025250     91400   18.3400 -108.6400      14.1        53       134        60
OIR    2025250     91400   18.3400 -108.6500      14.0        53       136        60
OIR    2025250     91400   18.3400 -108.6600      14.0        53       139        60
OIR    2025250     91400   18.3400 -108.6700      14.0        53       140        60
OIR    2025250     91400   18.3400 -108.6800      14.0        53       141        60
OIR    2025250     91400   18.3400 -108.6900      14.0        53       141        60
OIR    2025250     91400   18.3400 -108.7000      14.0        54       140        60
OIR    2025250     91400   18.3400 -108.7100      14.1        55       138        60
OIR    2025250     91400   18.3400 -108.7200      14.1        56       136        60
OIR    2025250     91400   18.3400 -108.7300      14.1        57       133        60
OIR    2025250     91400   18.3400 -108.7400      14.1        58       130        60
OIR    2025250     91400   18.3400 -108.7500      14.1        58       126        60
OIR    2025250     91400   18.3400 -108.7600      14.1        59       122        60
OIR    2025250     91400   18.3400 -108.7700      14.1        59       121        60
OIR    2025250     91400   18.3400 -108.7800      14.0        59       120        60
OIR    2025250     91400   18.3400 -108.7900      14.0        59       120        60
OIR    2025250     91400   18.3400 -108.8000      14.1        59       119        60
OIR    2025250     91400   18.3400 -108.8100      14.1        59       119        60
OIR    2025250     91400   18.3400 -108.8200      14.1        59       117        60
OIR    2025250     91400   18.3400 -108.8300      14.2        59       117        60
OIR    2025250     91400   18.3400 -108.8400      14.3        59       117        60
OIR    2025250     91400   18.3400 -108.8500      14.4        59       117        60
OIR    2025250     91400   18.3400 -108.8600      14.4        59       117        60
OIR    2025250     91400   18.3400 -108.8700      14.4        59       117        60
OIR    2025250     91400   18.3400 -108.8800      14.4        59       116        60
OIR    2025250     91400   18.3400 -108.8900      14.5        59       117        60
OIR    2025250     91400   18.3400 -108.9000      14.5        59       120        60
OIR    2025250     91400   18.3400 -108.9100      14.5        59       121        60
OIR    2025250     91400   18.3400 -108.9200      14.5        59       121        60
OIR    2025250     91400   18.3400 -108.9300      14.5        59       120        60
OIR    2025250     91400   18.3400 -108.9400      14.5        59       121        60
OIR    2025250     91400   18.3400 -108.9500      14.5        59       122        60
OIR    2025250     91400   18.3400 -108.9600      14.5        59       122        60
OIR    2025250     91400   18.3400 -108.9700      14.6        59       122        60
OIR    2025250     91400   18.3400 -108.9800      14.6        59       121        60
OIR    2025250     91400   18.3400 -108.9900      14.6        59       121        60
OIR    2025250     91400   18.3400 -109.0000      14.6        59       122        60
OIR    2025250     91400   18.3400 -109.0100      14.6        59       122        60
OIR    2025250     91400   18.3400 -109.0200      14.7        59       123        60
OIR    2025250     91400   18.3400 -109.0300      14.7        58       123        60
OIR    2025250     91400   18.3400 -109.0400      14.7        58       122        60
OIR    2025250     91400   18.3400 -109.0500      14.8        58       121        60
OIR    2025250     91400   18.3400 -109.0600      14.8        58       121        60
OIR    2025250     91400   18.3400 -109.0700      14.9        58       120        60
OIR    2025250     91400   18.3400 -109.0800      15.1        58       120        60
OIR    2025250     91400   18.3400 -109.0900      15.1        57       121        60
OIR    2025250     91400   18.3400 -109.1000      15.2        57       121        60
OIR    2025250     91400   18.3400 -109.1100      15.2        57       121        60
OIR    2025250     91400   18.3400 -109.1200      15.2        57       121        60
OIR    2025250     91400   18.3400 -109.1300      15.2        57       120        60
OIR    2025250     91400   18.3400 -109.1400      15.3        57       117        60
OIR    2025250     91400   18.3400 -109.1500      15.3        57       116        60
OIR    2025250     91400   18.3400 -109.1600      15.3        57       116        60
OIR    2025250     91400   18.3400 -109.1700      15.3        57       115        60
OIR    2025250     91400   18.3400 -109.1800      15.3        57       115        60
OIR    2025250     91400   18.3400 -109.1900      15.4        57       115        60
OIR    2025250     91400   18.3400 -109.2000      15.4        57       116        60
OIR    2025250     91400   18.3400 -109.2100      15.4        57       116        60
OIR    2025250     91400   18.3400 -109.2200      15.4        58       117        60
OIR    2025250     91400   18.3400 -109.2300      15.5        57       120        60
OIR    2025250     91400   18.3400 -109.2400      15.6        57       122        60
OIR    2025250     91400   18.3400 -109.2500      16.0        57       124        60
OIR    2025250     91400   18.3400 -109.2600      16.5        57       125        60
OIR    2025250     91400   18.3400 -109.2700      17.2        58       125        60
OIR    2025250     91400   18.3400 -109.2800      17.8        57       124        60
OIR    2025250     91400   18.3400 -109.2900      18.8        56       122        60
OIR    2025250     91400   18.3400 -109.3000      19.4        56       119        60
OIR    2025250     91400   18.3400 -109.3100      20.0        56       117        60
OIR    2025250     91400   18.3400 -109.3200      20.3        56       116        60
OIR    2025250     91400   18.3400 -109.3300      20.5        56       117        60
OIR    2025250     91400   18.3400 -109.3400      20.2        58       122        60
OIR    2025250     91400   18.3400 -109.3500      19.9        58       128        60
OIR    2025250     91400   18.3400 -109.3600      20.3        57       140        60
OIR    2025250     91400   18.3400 -110.8200      16.7        55       143        60
OIR    2025250     91400   18.3400 -110.8300      16.7        55       142        60
OIR    2025250     91400   18.3400 -110.8400      16.7        55       141        60
OIR    2025250     91400   18.3400 -110.8500      16.7        55       143        60
OIR    2025250     91400   18.3400 -111.2700      12.5        71       140        60
OIR    2025250     91400   18.3400 -111.2800      12.5        71       138        60
OIR    2025250     91400   18.3400 -111.2900      12.5        71       136        60
OIR    2025250     91400   18.3400 -111.3000      12.5        71       135        60
OIR    2025250     91400   18.3400 -111.3100      12.5        71       134        60
OIR    2025250     91400   18.3400 -111.3200      12.5        71       133        60
OIR    2025250     91400   18.3400 -111.3300      12.5        71       131        60
OIR    2025250     91400   18.3400 -111.3400      12.5        71       129        60
OIR    2025250     91400   18.3400 -111.3500      12.5        71       127        60
OIR    2025250     91400   18.3400 -111.3600      12.5        71       126        60
OIR    2025250     91400   18.3400 -111.3700      12.5        72       126        60
OIR    2025250     91400   18.3400 -111.3800      12.5        72       126        60
OIR    2025250     91400   18.3400 -111.3900      12.5        72       124        60
OIR    2025250     91400   18.3400 -111.4000      12.5        72       120        60
OIR    2025250     91400   18.3400 -111.4100      12.5        72       120        60
OIR    2025250     91400   18.3400 -111.4200      12.5        72       125        60
OIR    2025250     91400   18.3400 -111.4300      12.6        73       128        60
OIR    2025250     91400   18.3400 -111.4400      12.6        73       128        60
OIR    2025250     91400   18.3400 -111.4500      12.6        73       129        60
OIR    2025250     91400   18.3400 -111.4600      12.6        73       126        60
OIR    2025250     91400   18.3400 -111.4700      12.6        73       123        60
OIR    2025250     91400   18.3400 -111.4800      12.6        73       120        60
OIR    2025250     91400   18.3400 -111.4900      12.6        73       116        60
OIR    2025250     91400   18.3400 -111.5000      12.6        73       113        60
OIR    2025250     91400   18.3400 -111.5100      12.6        73       115        60
OIR    2025250     91400   18.3400 -111.5200      12.5        73       116        60
OIR    2025250     91400   18.3400 -111.5300      12.5        73       117        60
OIR    2025250     91400   18.3400 -111.5400      12.4        73       119        60
OIR    2025250     91400   18.3400 -111.5500      12.4        73       119        60
OIR    2025250     91400   18.3400 -111.5600      12.3        73       116        60
OIR    2025250     91400   18.3400 -111.5700      12.3        74       114        60
OIR    2025250     91400   18.3400 -111.5800      12.2        74       112        60
OIR    2025250     91400   18.3400 -111.5900      12.1        74       111        60
OIR    2025250     91400   18.3400 -111.6000      11.5        74       109        60
OIR    2025250     91400   18.3400 -111.6100      10.0        74       107        60
OIR    2025250     91400   18.3400 -111.6200       9.7        74       104        60
OIR    2025250     91400   18.3400 -111.6300       9.2        75       104        60
OIR    2025250     91400   18.3400 -111.6400       9.0        75       105        60
OIR    2025250     91400   18.3400 -111.6500       8.9        75       108        60
OIR    2025250     91400   18.3400 -111.6600       8.7        75       110        60
OIR    2025250     91400   18.3400 -111.6700       8.4        76       111        60
OIR    2025250     91400   18.3400 -111.6800       8.2        76       111        60
OIR    2025250     91400   18.3400 -111.6900       7.2        78       110        60
OIR    2025250     91400   18.3400 -111.7000       5.6        82       110        60
OIR    2025250     91400   18.3400 -111.7100       4.2        87       110        60
OIR    2025250     91400   18.3400 -111.9200       9.5        78       143        60
OIR    2025250     91400   18.3400 -112.2500      12.1        89       142        60
OIR    2025250     91400   18.3400 -112.2600      12.1        89       140        60
OIR    2025250     91400   18.3400 -112.2700      12.0        89       138        60
OIR    2025250     91400   18.3400 -112.2800      12.0        89       140        60
OIR    2025250     91400   18.3400 -112.3100      11.8        90       141        60
OIR    2025250     91400   18.3400 -112.3200      11.6        90       139        60
OIR    2025250     91400   18.3400 -112.4800       5.4       113       141        60
OIR    2025250     91400   18.3400 -112.4900       5.3       113       139        60
OIR    2025250     91400   18.3400 -112.5000       5.3       113       138        60
OIR    2025250     91400   18.3400 -112.5100       5.2       113       136        60
OIR    2025250     91400   18.3400 -112.5200       5.2       114       135        60
OIR    2025250     91400   18.3400 -112.5300       5.2       114       133        60
OIR    2025250     91400   18.3400 -112.5400       5.2       114       132        60
OIR    2025250     91400   18.3400 -112.5500       5.1       114       132        60
OIR    2025250     91400   18.3400 -112.5600       5.1       113       133        60
OIR    2025250     91400   18.3400 -112.5700       5.1       114       135        60
OIR    2025250     91400   18.3400 -112.5800       5.0       113       135        60
OIR    2025250     91400   18.3400 -112.5900       4.9       112       134        60
OIR    2025250     91400   18.3400 -112.6000       4.8       111       133        60
OIR    2025250     91400   18.3400 -112.6100       4.6       110       133        60
OIR    2025250     91400   18.3400 -112.6200       4.6       110       134        60
OIR    2025250     91400   18.3400 -112.6300       4.6       111       133        60
OIR    2025250     91400   18.3400 -112.6400       4.6       113       133        60
OIR    2025250     91400   18.3400 -112.6500       4.7       114       133        60
OIR    2025250     91400   18.3400 -112.6600       4.7       116       132        60
OIR    2025250     91400   18.3400 -112.6700       4.8       117       132        60
OIR    2025250     91400   18.3400 -112.6800       4.8       118       131        60
OIR    2025250     91400   18.3400 -112.6900       4.8       121       131        60
OIR    2025250     91400   18.3400 -112.7000       4.9       123       130        60
OIR    2025250     91400   18.3400 -112.7100       5.0       124       130        60
OIR    2025250     91400   18.3400 -112.7200       5.1       125       130        60
OIR    2025250     91400   18.3400 -112.7300       5.2       125       130        60
OIR    2025250     91400   18.3400 -112.7400       5.2       125       129        60
OIR    2025250     91400   18.3400 -112.7500       5.2       125       128        60
OIR    2025250     91400   18.3400 -112.7600       5.2       125       127        60
OIR    2025250     91400   18.3400 -112.7700       5.3       125       126        60
OIR    2025250     91400   18.3400 -112.7800       5.3       125       125        60
OIR    2025250     91400   18.3400 -112.7900       5.3       125       123        60
OIR    2025250     91400   18.3400 -112.8000       5.3       125       122        60
OIR    2025250     91400   18.3400 -112.8100       5.4       125       121        60
OIR    2025250     91400   18.3400 -112.8200       5.4       125       120        60
OIR    2025250     91400   18.3400 -112.8300       5.5       124       119        60
OIR    2025250     91400   18.3400 -112.8400       5.7       124       119        60
OIR    2025250     91400   18.3400 -112.8500       6.1       123       119        60
OIR    2025250     91400   18.3400 -112.8600       6.4       122       119        60
OIR    2025250     91400   18.3400 -112.8700       6.7       122       120        60
OIR    2025250     91400   18.3400 -112.8800       6.9       122       120        60
OIR    2025250     91400   18.3400 -112.8900       7.1       122       120        60
OIR    2025250     91400   18.3400 -112.9000       7.1       121       121        60
OIR    2025250     91400   18.3400 -112.9100       7.2       121       122        60
OIR    2025250     91400   18.3400 -112.9200       7.2       121       124        60
OIR    2025250     91400   18.3400 -112.9300       7.2       121       122        60
OIR    2025250     91400   18.3400 -112.9400       7.2       121       121        60
OIR    2025250     91400   18.3400 -112.9500       7.2       120       121        60
OIR    2025250     91400   18.3400 -112.9600       7.1       120       123        60
OIR    2025250     91400   18.3400 -112.9700       7.1       119       124        60
OIR    2025250     91400   18.3400 -112.9800       7.1       118       125        60
OIR    2025250     91400   18.3400 -112.9900       7.1       117       125        60
OIR    2025250     91400   18.3400 -113.0000       7.1       117       125        60
OIR    2025250     91400   18.3400 -113.0100       7.0       116       126        60
OIR    2025250     91400   18.3400 -113.0200       6.8       114       130        60
OIR    2025250     91400   18.3400 -113.0300       6.6       114       134        60
OIR    2025250     91400   18.3400 -113.0400       6.4       113       137        60
OIR    2025250     91400   18.3400 -113.0500       6.2       111       139        60
OIR    2025250     91400   18.3400 -113.0600       5.9       109       140        60
OIR    2025250     91400   18.3400 -113.0700       5.5       108       139        60
OIR    2025250     91400   18.3400 -113.0800       5.0       105       138        60
OIR    2025250     91400   18.3400 -113.0900       4.8       101       138        60
OIR    2025250     91400   18.3400 -113.1000       4.8       100       138        60
OIR    2025250     91400   18.3400 -113.1100       4.8        98       138        60
OIR    2025250     91400   18.3400 -113.1200       4.8        98       138        60
OIR    2025250     91400   18.3400 -113.1300       4.7        97       136        60
OIR    2025250     91400   18.3400 -113.1400       4.6        96       133        60
OIR    2025250     91400   18.3400 -113.1500       4.1        94       130        60
OIR    2025250     91400   18.3400 -113.9800       4.1       161       140        60
OIR    2025250     91400   18.3400 -113.9900       4.3       161       136        60
OIR    2025250     91400   18.3400 -114.0000       4.4       161       134        60
OIR    2025250     91400   18.3400 -114.0100       4.4       161       136        60
OIR    2025250     91400   18.3400 -114.0200       4.1       158       137        60
OIR    2025250     91400   18.3400 -114.2900       5.9       233       136        60
OIR    2025250     91400   18.3400 -114.3000       6.4       230       138        60
OIR    2025250     91400   18.3400 -114.3100       6.4       232       139        60
OIR    2025250     91400   18.3400 -114.3200       6.4       236       142        60
OIR    2025250     91400   18.3300 -108.6100      14.1        53       138        60
OIR    2025250     91400   18.3300 -108.6200      14.1        53       137        60
OIR    2025250     91400   18.3300 -108.6300      14.1        53       136        60
OIR    2025250     91400   18.3300 -108.6400      14.0        53       135        60
OIR    2025250     91400   18.3300 -108.6500      14.0        53       137        60
OIR    2025250     91400   18.3300 -108.6600      14.0        53       139        60
OIR    2025250     91400   18.3300 -108.6700      14.0        53       139        60
OIR    2025250     91400   18.3300 -108.6800      14.0        53       140        60
OIR    2025250     91400   18.3300 -108.6900      14.0        54       140        60
OIR    2025250     91400   18.3300 -108.7000      14.0        54       139        60
OIR    2025250     91400   18.3300 -108.7100      14.0        55       138        60
OIR    2025250     91400   18.3300 -108.7200      14.1        57       136        60
OIR    2025250     91400   18.3300 -108.7300      14.1        57       133        60
OIR    2025250     91400   18.3300 -108.7400      14.1        58       131        60
OIR    2025250     91400   18.3300 -108.7500      14.0        59       126        60
OIR    2025250     91400   18.3300 -108.7600      14.0        59       121        60
OIR    2025250     91400   18.3300 -108.7700      14.0        59       120        60
OIR    2025250     91400   18.3300 -108.7800      14.0        59       120        60
OIR    2025250     91400   18.3300 -108.7900      14.0        59       120        60
OIR    2025250     91400   18.3300 -108.8000      14.0        60       120        60
OIR    2025250     91400   18.3300 -108.8100      14.0        60       120        60
OIR    2025250     91400   18.3300 -108.8200      14.1        60       119        60
OIR    2025250     91400   18.3300 -108.8300      14.1        59       119        60
OIR    2025250     91400   18.3300 -108.8400      14.3        59       119        60
OIR    2025250     91400   18.3300 -108.8500      14.3        59       117        60
OIR    2025250     91400   18.3300 -108.8600      14.4        59       116        60
OIR    2025250     91400   18.3300 -108.8700      14.4        59       116        60
OIR    2025250     91400   18.3300 -108.8800      14.4        59       115        60
OIR    2025250     91400   18.3300 -108.8900      14.4        59       115        60
OIR    2025250     91400   18.3300 -108.9000      14.5        59       117        60
OIR    2025250     91400   18.3300 -108.9100      14.5        59       120        60
OIR    2025250     91400   18.3300 -108.9200      14.5        59       121        60
OIR    2025250     91400   18.3300 -108.9300      14.5        59       121        60
OIR    2025250     91400   18.3300 -108.9400      14.5        59       121        60
OIR    2025250     91400   18.3300 -108.9500      14.5        59       122        60
OIR    2025250     91400   18.3300 -108.9600      14.5        59       122        60
OIR    2025250     91400   18.3300 -108.9700      14.5        59       123        60
OIR    2025250     91400   18.3300 -108.9800      14.6        59       123        60
OIR    2025250     91400   18.3300 -108.9900      14.6        59       123        60
OIR    2025250     91400   18.3300 -109.0000      14.6        59       123        60
OIR    2025250     91400   18.3300 -109.0100      14.6        59       124        60
OIR    2025250     91400   18.3300 -109.0200      14.6        59       124        60
OIR    2025250     91400   18.3300 -109.0300      14.7        59       124        60
OIR    2025250     91400   18.3300 -109.0400      14.7        58       124        60
OIR    2025250     91400   18.3300 -109.0500      14.8        58       123        60
OIR    2025250     91400   18.3300 -109.0600      14.8        58       122        60
OIR    2025250     91400   18.3300 -109.0700      14.9        58       123        60
OIR    2025250     91400   18.3300 -109.0800      15.0        58       123        60
OIR    2025250     91400   18.3300 -109.0900      15.1        58       124        60
OIR    2025250     91400   18.3300 -109.1000      15.1        57       126        60
OIR    2025250     91400   18.3300 -109.1100      15.2        57       126        60
OIR    2025250     91400   18.3300 -109.1200      15.2        57       125        60
OIR    2025250     91400   18.3300 -109.1300      15.2        57       125        60
OIR    2025250     91400   18.3300 -109.1400      15.3        57       123        60
OIR    2025250     91400   18.3300 -109.1500      15.3        57       121        60
OIR    2025250     91400   18.3300 -109.1600      15.3        57       120        60
OIR    2025250     91400   18.3300 -109.1700      15.3        57       120        60
OIR    2025250     91400   18.3300 -109.1800      15.3        57       121        60
OIR    2025250     91400   18.3300 -109.1900      15.4        57       120        60
OIR    2025250     91400   18.3300 -109.2000      15.4        58       119        60
OIR    2025250     91400   18.3300 -109.2100      15.4        58       120        60
OIR    2025250     91400   18.3300 -109.2200      15.5        58       121        60
OIR    2025250     91400   18.3300 -109.2300      15.5        57       121        60
OIR    2025250     91400   18.3300 -109.2400      15.7        57       123        60
OIR    2025250     91400   18.3300 -109.2500      16.5        57       124        60
OIR    2025250     91400   18.3300 -109.2600      17.2        57       125        60
OIR    2025250     91400   18.3300 -109.2700      18.3        58       125        60
OIR    2025250     91400   18.3300 -109.2800      19.0        57       125        60
OIR    2025250     91400   18.3300 -109.2900      19.7        56       121        60
OIR    2025250     91400   18.3300 -109.3000      20.2        56       116        60
OIR    2025250     91400   18.3300 -109.3100      20.5        56       116        60
OIR    2025250     91400   18.3300 -109.3200      20.6        56       116        60
OIR    2025250     91400   18.3300 -109.3300      20.7        56       120        60
OIR    2025250     91400   18.3300 -109.3400      20.6        57       123        60
OIR    2025250     91400   18.3300 -109.3500      20.0        58       127        60
OIR    2025250     91400   18.3300 -109.3600      19.9        59       139        60
OIR    2025250     91400   18.3300 -110.8300      16.7        55       142        60
OIR    2025250     91400   18.3300 -110.8400      16.7        55       141        60
OIR    2025250     91400   18.3300 -110.8500      16.7        55       141        60
OIR    2025250     91400   18.3300 -110.8600      16.7        55       141        60
OIR    2025250     91400   18.3300 -110.8700      16.7        55       142        60
OIR    2025250     91400   18.3300 -110.8800      16.7        55       142        60
OIR    2025250     91400   18.3300 -111.2600      12.6        71       143        60
OIR    2025250     91400   18.3300 -111.2700      12.5        71       139        60
OIR    2025250     91400   18.3300 -111.2800      12.5        71       135        60
OIR    2025250     91400   18.3300 -111.2900      12.5        71       132        60
OIR    2025250     91400   18.3300 -111.3000      12.5        71       131        60
OIR    2025250     91400   18.3300 -111.3100      12.5        71       130        60
OIR    2025250     91400   18.3300 -111.3200      12.5        71       130        60
OIR    2025250     91400   18.3300 -111.3300      12.5        71       131        60
OIR    2025250     91400   18.3300 -111.3400      12.5        71       131        60
OIR    2025250     91400   18.3300 -111.3500      12.5        71       129        60
OIR    2025250     91400   18.3300 -111.3600      12.5        71       128        60
OIR    2025250     91400   18.3300 -111.3700      12.5        72       127        60
OIR    2025250     91400   18.3300 -111.3800      12.5        72       125        60
OIR    2025250     91400   18.3300 -111.3900      12.5        72       123        60
OIR    2025250     91400   18.3300 -111.4000      12.5        72       120        60
OIR    2025250     91400   18.3300 -111.4100      12.5        72       117        60
OIR    2025250     91400   18.3300 -111.4200      12.5        73       121        60
OIR    2025250     91400   18.3300 -111.4300      12.5        73       124        60
OIR    2025250     91400   18.3300 -111.4400      12.5        73       126        60
OIR    2025250     91400   18.3300 -111.4500      12.5        73       127        60
OIR    2025250     91400   18.3300 -111.4600      12.5        73       126        60
OIR    2025250     91400   18.3300 -111.4700      12.6        73       122        60
OIR    2025250     91400   18.3300 -111.4800      12.6        73       116        60
OIR    2025250     91400   18.3300 -111.4900      12.5        73       115        60
OIR    2025250     91400   18.3300 -111.5000      12.5        73       113        60
OIR    2025250     91400   18.3300 -111.5100      12.5        73       115        60
OIR    2025250     91400   18.3300 -111.5200      12.4        73       116        60
OIR    2025250     91400   18.3300 -111.5300      12.4        73       117        60
OIR    2025250     91400   18.3300 -111.5400      12.3        73       117        60
OIR    2025250     91400   18.3300 -111.5500      12.3        74       117        60
OIR    2025250     91400   18.3300 -111.5600      12.3        74       116        60
OIR    2025250     91400   18.3300 -111.5700      12.2        74       113        60
OIR    2025250     91400   18.3300 -111.5800      12.2        74       112        60
OIR    2025250     91400   18.3300 -111.5900      12.1        74       111        60
OIR    2025250     91400   18.3300 -111.6000      11.3        73       109        60
OIR    2025250     91400   18.3300 -111.6100       9.8        74       108        60
OIR    2025250     91400   18.3300 -111.6200       9.5        74       107        60
OIR    2025250     91400   18.3300 -111.6300       9.1        74       107        60
OIR    2025250     91400   18.3300 -111.6400       8.8        75       107        60
OIR    2025250     91400   18.3300 -111.6500       8.7        75       108        60
OIR    2025250     91400   18.3300 -111.6600       8.6        76       110        60
OIR    2025250     91400   18.3300 -111.6700       8.4        76       112        60
OIR    2025250     91400   18.3300 -111.6800       7.9        78       112        60
OIR    2025250     91400   18.3300 -111.6900       6.5        85       112        60
OIR    2025250     91400   18.3300 -111.7000       5.2        91       112        60
OIR    2025250     91400   18.3300 -112.2500      12.1        89       141        60
OIR    2025250     91400   18.3300 -112.2600      12.1        89       140        60
OIR    2025250     91400   18.3300 -112.2700      12.0        89       140        60
OIR    2025250     91400   18.3300 -112.2800      12.0        89       140        60
OIR    2025250     91400   18.3300 -112.3200      11.7        90       142        60
OIR    2025250     91400   18.3300 -112.3700       7.8       103       142        60
OIR    2025250     91400   18.3300 -112.3800       6.7       108       141        60
OIR    2025250     91400   18.3300 -112.3900       6.1       112       140        60
OIR    2025250     91400   18.3300 -112.4000       5.7       114       140        60
OIR    2025250     91400   18.3300 -112.4100       5.6       115       139        60
OIR    2025250     91400   18.3300 -112.4200       5.6       115       141        60
OIR    2025250     91400   18.3300 -112.4700       5.4       114       142        60
OIR    2025250     91400   18.3300 -112.4800       5.4       114       138        60
OIR    2025250     91400   18.3300 -112.4900       5.3       114       138        60
OIR    2025250     91400   18.3300 -112.5000       5.3       114       138        60
OIR    2025250     91400   18.3300 -112.5100       5.3       114       138        60
OIR    2025250     91400   18.3300 -112.5200       5.2       114       136        60
OIR    2025250     91400   18.3300 -112.5300       5.2       114       134        60
OIR    2025250     91400   18.3300 -112.5400       5.2       114       133        60
OIR    2025250     91400   18.3300 -112.5500       5.2       114       132        60
OIR    2025250     91400   18.3300 -112.5600       5.1       114       132        60
OIR    2025250     91400   18.3300 -112.5700       5.1       114       132        60
OIR    2025250     91400   18.3300 -112.5800       5.1       114       133        60
OIR    2025250     91400   18.3300 -112.5900       5.0       114       133        60
OIR    2025250     91400   18.3300 -112.6000       4.9       113       133        60
OIR    2025250     91400   18.3300 -112.6100       4.8       113       133        60
OIR    2025250     91400   18.3300 -112.6200       4.8       113       133        60
OIR    2025250     91400   18.3300 -112.6300       4.7       114       133        60
OIR    2025250     91400   18.3300 -112.6400       4.8       115       133        60
OIR    2025250     91400   18.3300 -112.6500       4.8       116       133        60
OIR    2025250     91400   18.3300 -112.6600       4.8       116       133        60
OIR    2025250     91400   18.3300 -112.6700       4.8       117       133        60
OIR    2025250     91400   18.3300 -112.6800       4.8       119       132        60
OIR    2025250     91400   18.3300 -112.6900       4.9       120       132        60
OIR    2025250     91400   18.3300 -112.7000       5.0       123       131        60
OIR    2025250     91400   18.3300 -112.7100       5.1       124       130        60
OIR    2025250     91400   18.3300 -112.7200       5.1       125       130        60
OIR    2025250     91400   18.3300 -112.7300       5.2       125       130        60
OIR    2025250     91400   18.3300 -112.7400       5.2       125       130        60
OIR    2025250     91400   18.3300 -112.7500       5.2       125       128        60
OIR    2025250     91400   18.3300 -112.7600       5.3       125       127        60
OIR    2025250     91400   18.3300 -112.7700       5.3       125       126        60
OIR    2025250     91400   18.3300 -112.7800       5.3       125       125        60
OIR    2025250     91400   18.3300 -112.7900       5.3       125       124        60
OIR    2025250     91400   18.3300 -112.8000       5.3       125       123        60
OIR    2025250     91400   18.3300 -112.8100       5.4       125       122        60
OIR    2025250     91400   18.3300 -112.8200       5.5       125       121        60
OIR    2025250     91400   18.3300 -112.8300       5.7       125       121        60
OIR    2025250     91400   18.3300 -112.8400       6.1       124       121        60
OIR    2025250     91400   18.3300 -112.8500       6.4       123       121        60
OIR    2025250     91400   18.3300 -112.8600       6.7       122       121        60
OIR    2025250     91400   18.3300 -112.8700       6.9       122       121        60
OIR    2025250     91400   18.3300 -112.8800       7.1       122       121        60
OIR    2025250     91400   18.3300 -112.8900       7.2       121       122        60
OIR    2025250     91400   18.3300 -112.9000       7.2       121       123        60
OIR    2025250     91400   18.3300 -112.9100       7.2       121       124        60
OIR    2025250     91400   18.3300 -112.9200       7.2       121       126        60
OIR    2025250     91400   18.3300 -112.9300       7.2       121       125        60
OIR    2025250     91400   18.3300 -112.9400       7.2       121       123        60
OIR    2025250     91400   18.3300 -112.9500       7.2       120       122        60
OIR    2025250     91400   18.3300 -112.9600       7.2       120       123        60
OIR    2025250     91400   18.3300 -112.9700       7.2       119       124        60
OIR    2025250     91400   18.3300 -112.9800       7.2       118       124        60
OIR    2025250     91400   18.3300 -112.9900       7.2       117       124        60
OIR    2025250     91400   18.3300 -113.0000       7.2       116       124        60
OIR    2025250     91400   18.3300 -113.0100       7.2       116       125        60
OIR    2025250     91400   18.3300 -113.0200       7.3       115       127        60
OIR    2025250     91400   18.3300 -113.0300       7.4       115       131        60
OIR    2025250     91400   18.3300 -113.0400       7.4       114       135        60
OIR    2025250     91400   18.3300 -113.0500       7.3       114       137        60
OIR    2025250     91400   18.3300 -113.0600       7.2       113       140        60
OIR    2025250     91400   18.3300 -113.0700       6.9       110       138        60
OIR    2025250     91400   18.3300 -113.0800       6.0       108       136        60
OIR    2025250     91400   18.3300 -113.0900       5.5       105       135        60
OIR    2025250     91400   18.3300 -113.1000       5.3       101       135        60
OIR    2025250     91400   18.3300 -113.1100       5.1        98       135        60
OIR    2025250     91400   18.3300 -113.1200       5.0        97       134        60
OIR    2025250     91400   18.3300 -113.1300       4.9        97       134        60
OIR    2025250     91400   18.3300 -113.1400       4.7        96       132        60
OIR    2025250     91400   18.3300 -113.1500       4.2        95       129        60
OIR    2025250     91400   18.3300 -113.3900       6.9        93       143        60
OIR    2025250     91400   18.3300 -113.4000       6.9        93       141        60
OIR    2025250     91400   18.3300 -113.8900       4.6       151       140        60
OIR    2025250     91400   18.3300 -113.9000       4.5       153       139        60
OIR    2025250     91400   18.3300 -113.9100       4.4       154       138        60
OIR    2025250     91400   18.3300 -113.9200       4.3       155       138        60
OIR    2025250     91400   18.3300 -113.9300       4.3       155       139        60
OIR    2025250     91400   18.3300 -113.9400       4.2       156       139        60
OIR    2025250     91400   18.3300 -113.9500       4.2       157       138        60
OIR    2025250     91400   18.3300 -114.2900       5.2       250       137        60
OIR    2025250     91400   18.3300 -114.3000       6.1       244       140        60
OIR    2025250     91400   18.3200 -108.6100      14.0        53       140        60
OIR    2025250     91400   18.3200 -108.6200      14.0        53       138        60
OIR    2025250     91400   18.3200 -108.6300      14.0        53       137        60
OIR    2025250     91400   18.3200 -108.6400      14.0        53       137        60
OIR    2025250     91400   18.3200 -108.6500      14.0        53       138        60
OIR    2025250     91400   18.3200 -108.6600      14.0        53       141        60
OIR    2025250     91400   18.3200 -108.6700      13.9        53       143        60
OIR    2025250     91400   18.3200 -108.6800      13.9        53       142        60
OIR    2025250     91400   18.3200 -108.6900      13.9        54       142        60
OIR    2025250     91400   18.3200 -108.7000      13.9        55       140        60
OIR    2025250     91400   18.3200 -108.7100      14.0        56       138        60
OIR    2025250     91400   18.3200 -108.7200      14.0        57       136        60
OIR    2025250     91400   18.3200 -108.7300      14.0        58       133        60
OIR    2025250     91400   18.3200 -108.7400      14.0        58       131        60
OIR    2025250     91400   18.3200 -108.7500      14.0        59       127        60
OIR    2025250     91400   18.3200 -108.7600      14.0        59       123        60
OIR    2025250     91400   18.3200 -108.7700      14.0        59       121        60
OIR    2025250     91400   18.3200 -108.7800      14.0        59       121        60
OIR    2025250     91400   18.3200 -108.7900      13.9        60       121        60
OIR    2025250     91400   18.3200 -108.8000      13.9        60       121        60
OIR    2025250     91400   18.3200 -108.8100      13.9        60       121        60
OIR    2025250     91400   18.3200 -108.8200      14.0        60       121        60
OIR    2025250     91400   18.3200 -108.8300      14.0        60       120        60
OIR    2025250     91400   18.3200 -108.8400      14.2        59       120        60
OIR    2025250     91400   18.3200 -108.8500      14.3        59       119        60
OIR    2025250     91400   18.3200 -108.8600      14.4        59       117        60
OIR    2025250     91400   18.3200 -108.8700      14.4        59       116        60
OIR    2025250     91400   18.3200 -108.8800      14.4        59       114        60
OIR    2025250     91400   18.3200 -108.8900      14.4        59       113        60
OIR    2025250     91400   18.3200 -108.9000      14.4        59       116        60
OIR    2025250     91400   18.3200 -108.9100      14.4        59       120        60
OIR    2025250     91400   18.3200 -108.9200      14.5        59       121        60
OIR    2025250     91400   18.3200 -108.9300      14.5        59       121        60
OIR    2025250     91400   18.3200 -108.9400      14.5        59       122        60
OIR    2025250     91400   18.3200 -108.9500      14.5        59       122        60
OIR    2025250     91400   18.3200 -108.9600      14.5        59       121        60
OIR    2025250     91400   18.3200 -108.9700      14.5        59       123        60
OIR    2025250     91400   18.3200 -108.9800      14.5        59       124        60
OIR    2025250     91400   18.3200 -108.9900      14.6        59       125        60
OIR    2025250     91400   18.3200 -109.0000      14.6        59       125        60
OIR    2025250     91400   18.3200 -109.0100      14.6        59       124        60
OIR    2025250     91400   18.3200 -109.0200      14.6        59       124        60
OIR    2025250     91400   18.3200 -109.0300      14.6        59       124        60
OIR    2025250     91400   18.3200 -109.0400      14.7        59       124        60
OIR    2025250     91400   18.3200 -109.0500      14.7        59       123        60
OIR    2025250     91400   18.3200 -109.0600      14.8        58       123        60
OIR    2025250     91400   18.3200 -109.0700      14.8        58       124        60
OIR    2025250     91400   18.3200 -109.0800      14.9        58       125        60
OIR    2025250     91400   18.3200 -109.0900      15.0        58       126        60
OIR    2025250     91400   18.3200 -109.1000      15.0        58       127        60
OIR    2025250     91400   18.3200 -109.1100      15.1        58       128        60
OIR    2025250     91400   18.3200 -109.1200      15.2        58       127        60
OIR    2025250     91400   18.3200 -109.1300      15.2        57       126        60
OIR    2025250     91400   18.3200 -109.1400      15.2        57       125        60
OIR    2025250     91400   18.3200 -109.1500      15.3        58       123        60
OIR    2025250     91400   18.3200 -109.1600      15.3        58       123        60
OIR    2025250     91400   18.3200 -109.1700      15.3        58       123        60
OIR    2025250     91400   18.3200 -109.1800      15.3        58       124        60
OIR    2025250     91400   18.3200 -109.1900      15.4        58       123        60
OIR    2025250     91400   18.3200 -109.2000      15.4        58       123        60
OIR    2025250     91400   18.3200 -109.2100      15.4        58       122        60
OIR    2025250     91400   18.3200 -109.2200      15.5        58       123        60
OIR    2025250     91400   18.3200 -109.2300      15.6        58       124        60
OIR    2025250     91400   18.3200 -109.2400      16.0        57       124        60
OIR    2025250     91400   18.3200 -109.2500      17.4        57       124        60
OIR    2025250     91400   18.3200 -109.2600      18.6        57       124        60
OIR    2025250     91400   18.3200 -109.2700      19.7        57       124        60
OIR    2025250     91400   18.3200 -109.2800      20.3        57       124        60
OIR    2025250     91400   18.3200 -109.2900      20.5        57       121        60
OIR    2025250     91400   18.3200 -109.3000      20.6        56       117        60
OIR    2025250     91400   18.3200 -109.3100      20.7        56       116        60
OIR    2025250     91400   18.3200 -109.3200      20.7        56       117        60
OIR    2025250     91400   18.3200 -109.3300      20.7        56       120        60
OIR    2025250     91400   18.3200 -109.3400      20.7        56       123        60
OIR    2025250     91400   18.3200 -109.3500      20.5        57       126        60
OIR    2025250     91400   18.3200 -109.3600      19.8        59       136        60
OIR    2025250     91400   18.3200 -110.8300      16.7        55       143        60
OIR    2025250     91400   18.3200 -110.8400      16.7        55       141        60
OIR    2025250     91400   18.3200 -110.8500      16.7        55       140        60
OIR    2025250     91400   18.3200 -110.8600      16.7        55       138        60
OIR    2025250     91400   18.3200 -110.8700      16.7        55       137        60
OIR    2025250     91400   18.3200 -110.8800      16.7        55       139        60
OIR    2025250     91400   18.3200 -110.8900      16.8        55       141        60
OIR    2025250     91400   18.3200 -111.2600      12.6        70       143        60
OIR    2025250     91400   18.3200 -111.2700      12.5        71       138        60
OIR    2025250     91400   18.3200 -111.2800      12.5        71       135        60
OIR    2025250     91400   18.3200 -111.2900      12.5        71       131        60
OIR    2025250     91400   18.3200 -111.3000      12.5        71       130        60
OIR    2025250     91400   18.3200 -111.3100      12.5        71       129        60
OIR    2025250     91400   18.3200 -111.3200      12.5        71       128        60
OIR    2025250     91400   18.3200 -111.3300      12.5        71       130        60
OIR    2025250     91400   18.3200 -111.3400      12.5        71       132        60
OIR    2025250     91400   18.3200 -111.3500      12.4        71       130        60
OIR    2025250     91400   18.3200 -111.3600      12.4        72       127        60
OIR    2025250     91400   18.3200 -111.3700      12.4        72       125        60
OIR    2025250     91400   18.3200 -111.3800      12.5        72       123        60
OIR    2025250     91400   18.3200 -111.3900      12.5        72       121        60
OIR    2025250     91400   18.3200 -111.4000      12.5        72       119        60
OIR    2025250     91400   18.3200 -111.4100      12.5        72       116        60
OIR    2025250     91400   18.3200 -111.4200      12.5        73       119        60
OIR    2025250     91400   18.3200 -111.4300      12.5        73       120        60
OIR    2025250     91400   18.3200 -111.4400      12.5        73       122        60
OIR    2025250     91400   18.3200 -111.4500      12.5        73       125        60
OIR    2025250     91400   18.3200 -111.4600      12.5        73       127        60
OIR    2025250     91400   18.3200 -111.4700      12.5        73       121        60
OIR    2025250     91400   18.3200 -111.4800      12.5        73       115        60
OIR    2025250     91400   18.3200 -111.4900      12.5        73       114        60
OIR    2025250     91400   18.3200 -111.5000      12.4        73       114        60
OIR    2025250     91400   18.3200 -111.5100      12.4        73       115        60
OIR    2025250     91400   18.3200 -111.5200      12.4        73       116        60
OIR    2025250     91400   18.3200 -111.5300      12.3        74       116        60
OIR    2025250     91400   18.3200 -111.5400      12.3        74       116        60
OIR    2025250     91400   18.3200 -111.5500      12.3        74       116        60
OIR    2025250     91400   18.3200 -111.5600      12.2        74       115        60
OIR    2025250     91400   18.3200 -111.5700      12.2        74       113        60
OIR    2025250     91400   18.3200 -111.5800      12.1        74       111        60
OIR    2025250     91400   18.3200 -111.5900      12.0        74       111        60
OIR    2025250     91400   18.3200 -111.6000      11.2        73       110        60
OIR    2025250     91400   18.3200 -111.6100       9.7        73       109        60
OIR    2025250     91400   18.3200 -111.6200       9.4        74       108        60
OIR    2025250     91400   18.3200 -111.6300       8.9        75       108        60
OIR    2025250     91400   18.3200 -111.6400       8.7        75       108        60
OIR    2025250     91400   18.3200 -111.6500       8.6        76       109        60
OIR    2025250     91400   18.3200 -111.6600       8.5        76       110        60
OIR    2025250     91400   18.3200 -111.6700       8.3        77       112        60
OIR    2025250     91400   18.3200 -111.6800       7.7        80       111        60
OIR    2025250     91400   18.3200 -111.6900       6.4        85       111        60
OIR    2025250     91400   18.3200 -111.7000       5.0        92       111        60
OIR    2025250     91400   18.3200 -112.2400      12.1        89       142        60
OIR    2025250     91400   18.3200 -112.2500      12.1        89       140        60
OIR    2025250     91400   18.3200 -112.2600      12.1        89       140        60
OIR    2025250     91400   18.3200 -112.2700      12.1        89       142        60
OIR    2025250     91400   18.3200 -112.2900      12.0        89       142        60
OIR    2025250     91400   18.3200 -112.3000      12.0        89       141        60
OIR    2025250     91400   18.3200 -112.3400      11.2        91       142        60
OIR    2025250     91400   18.3200 -112.3500      10.7        92       140        60
OIR    2025250     91400   18.3200 -112.3800       7.2       103       142        60
OIR    2025250     91400   18.3200 -112.3900       6.3       109       141        60
OIR    2025250     91400   18.3200 -112.4000       5.8       113       140        60
OIR    2025250     91400   18.3200 -112.4100       5.6       115       139        60
OIR    2025250     91400   18.3200 -112.4200       5.6       115       139        60
OIR    2025250     91400   18.3200 -112.4300       5.6       115       141        60
OIR    2025250     91400   18.3200 -112.4800       5.4       114       141        60
OIR    2025250     91400   18.3200 -112.4900       5.3       114       139        60
OIR    2025250     91400   18.3200 -112.5000       5.3       114       138        60
OIR    2025250     91400   18.3200 -112.5100       5.3       114       138        60
OIR    2025250     91400   18.3200 -112.5200       5.3       114       136        60
OIR    2025250     91400   18.3200 -112.5300       5.2       114       135        60
OIR    2025250     91400   18.3200 -112.5400       5.2       115       134        60
OIR    2025250     91400   18.3200 -112.5500       5.2       115       133        60
OIR    2025250     91400   18.3200 -112.5600       5.2       115       133        60
OIR    2025250     91400   18.3200 -112.5700       5.1       115       132        60
OIR    2025250     91400   18.3200 -112.5800       5.1       114       132        60
OIR    2025250     91400   18.3200 -112.5900       5.1       114       133        60
OIR    2025250     91400   18.3200 -112.6000       5.0       114       134        60
OIR    2025250     91400   18.3200 -112.6100       4.9       114       134        60
OIR    2025250     91400   18.3200 -112.6200       4.9       114       133        60
OIR    2025250     91400   18.3200 -112.6300       4.8       115       133        60
OIR    2025250     91400   18.3200 -112.6400       4.8       115       133        60
OIR    2025250     91400   18.3200 -112.6500       4.8       116       132        60
OIR    2025250     91400   18.3200 -112.6600       4.8       117       133        60
OIR    2025250     91400   18.3200 -112.6700       4.9       117       134        60
OIR    2025250     91400   18.3200 -112.6800       4.9       119       133        60
OIR    2025250     91400   18.3200 -112.6900       5.0       121       132        60
OIR    2025250     91400   18.3200 -112.7000       5.0       123       131        60
OIR    2025250     91400   18.3200 -112.7100       5.1       125       131        60
OIR    2025250     91400   18.3200 -112.7200       5.1       125       130        60
OIR    2025250     91400   18.3200 -112.7300       5.2       125       130        60
OIR    2025250     91400   18.3200 -112.7400       5.2       125       130        60
OIR    2025250     91400   18.3200 -112.7500       5.2       125       129        60
OIR    2025250     91400   18.3200 -112.7600       5.3       125       128        60
OIR    2025250     91400   18.3200 -112.7700       5.3       125       126        60
OIR    2025250     91400   18.3200 -112.7800       5.3       125       125        60
OIR    2025250     91400   18.3200 -112.7900       5.3       125       124        60
OIR    2025250     91400   18.3200 -112.8000       5.4       125       123        60
OIR    2025250     91400   18.3200 -112.8100       5.4       125       122        60
OIR    2025250     91400   18.3200 -112.8200       5.6       125       123        60
OIR    2025250     91400   18.3200 -112.8300       6.1       125       123        60
OIR    2025250     91400   18.3200 -112.8400       6.6       124       123        60
OIR    2025250     91400   18.3200 -112.8500       6.9       123       122        60
OIR    2025250     91400   18.3200 -112.8600       7.0       122       122        60
OIR    2025250     91400   18.3200 -112.8700       7.1       122       123        60
OIR    2025250     91400   18.3200 -112.8800       7.2       122       123        60
OIR    2025250     91400   18.3200 -112.8900       7.2       121       125        60
OIR    2025250     91400   18.3200 -112.9000       7.2       121       126        60
OIR    2025250     91400   18.3200 -112.9100       7.2       121       128        60
OIR    2025250     91400   18.3200 -112.9200       7.2       121       130        60
OIR    2025250     91400   18.3200 -112.9300       7.2       121       129        60
OIR    2025250     91400   18.3200 -112.9400       7.2       121       126        60
OIR    2025250     91400   18.3200 -112.9500       7.2       120       124        60
OIR    2025250     91400   18.3200 -112.9600       7.2       120       123        60
OIR    2025250     91400   18.3200 -112.9700       7.2       119       122        60
OIR    2025250     91400   18.3200 -112.9800       7.2       118       122        60
OIR    2025250     91400   18.3200 -112.9900       7.3       117       122        60
OIR    2025250     91400   18.3200 -113.0000       7.3       116       122        60
OIR    2025250     91400   18.3200 -113.0100       7.4       115       123        60
OIR    2025250     91400   18.3200 -113.0200       7.4       115       125        60
OIR    2025250     91400   18.3200 -113.0300       7.5       114       128        60
OIR    2025250     91400   18.3200 -113.0400       7.5       114       132        60
OIR    2025250     91400   18.3200 -113.0500       7.5       114       134        60
OIR    2025250     91400   18.3200 -113.0600       7.4       113       135        60
OIR    2025250     91400   18.3200 -113.0700       7.4       112       136        60
OIR    2025250     91400   18.3200 -113.0800       7.0       111       136        60
OIR    2025250     91400   18.3200 -113.0900       6.4       110       135        60
OIR    2025250     91400   18.3200 -113.1000       6.0       106       135        60
OIR    2025250     91400   18.3200 -113.1100       5.7       102       134        60
OIR    2025250     91400   18.3200 -113.1200       5.4       100       134        60
OIR    2025250     91400   18.3200 -113.1300       5.3        98       135        60
OIR    2025250     91400   18.3200 -113.1400       5.1        97       133        60
OIR    2025250     91400   18.3200 -113.1500       4.6        95       131        60
OIR    2025250     91400   18.3200 -113.1600       4.1        94       129        60
OIR    2025250     91400   18.3200 -113.3500       4.0        96       142        60
OIR    2025250     91400   18.3200 -113.3900       6.8        93       143        60
OIR    2025250     91400   18.3200 -113.4000       6.8        93       140        60
OIR    2025250     91400   18.3200 -113.4100       6.9        93       141        60
OIR    2025250     91400   18.3200 -113.8800       4.7       151       142        60
OIR    2025250     91400   18.3200 -113.8900       4.6       152       139        60
OIR    2025250     91400   18.3200 -113.9000       4.4       154       137        60
OIR    2025250     91400   18.3200 -113.9100       4.3       155       136        60
OIR    2025250     91400   18.3200 -113.9200       4.3       155       136        60
OIR    2025250     91400   18.3200 -113.9300       4.3       155       137        60
OIR    2025250     91400   18.3200 -113.9400       4.2       156       137        60
OIR    2025250     91400   18.3200 -113.9500       4.1       156       137        60
OIR    2025250     91400   18.3200 -114.2800       4.0       255       136        60
OIR    2025250     91400   18.3200 -114.2900       5.1       254       139        60
OIR    2025250     91400   18.3100 -108.6100      14.0        53       142        60
OIR    2025250     91400   18.3100 -108.6200      14.0        53       139        60
OIR    2025250     91400   18.3100 -108.6300      14.0        53       139        60
OIR    2025250     91400   18.3100 -108.6400      14.0        53       138        60
OIR    2025250     91400   18.3100 -108.6500      13.9        53       139        60
OIR    2025250     91400   18.3100 -108.7000      13.8        55       142        60
OIR    2025250     91400   18.3100 -108.7100      13.9        56       138        60
OIR    2025250     91400   18.3100 -108.7200      14.0        57       135        60
OIR    2025250     91400   18.3100 -108.7300      14.0        58       133        60
OIR    2025250     91400   18.3100 -108.7400      14.0        59       130        60
OIR    2025250     91400   18.3100 -108.7500      14.0        59       128        60
OIR    2025250     91400   18.3100 -108.7600      13.9        59       125        60
OIR    2025250     91400   18.3100 -108.7700      13.9        59       123        60
OIR    2025250     91400   18.3100 -108.7800      13.9        60       123        60
OIR    2025250     91400   18.3100 -108.7900      13.8        60       123        60
OIR    2025250     91400   18.3100 -108.8000      13.6        61       123        60
OIR    2025250     91400   18.3100 -108.8100      13.6        61       123        60
OIR    2025250     91400   18.3100 -108.8200      13.6        61       123        60
OIR    2025250     91400   18.3100 -108.8300      13.6        61       123        60
OIR    2025250     91400   18.3100 -108.8400      13.8        60       123        60
OIR    2025250     91400   18.3100 -108.8500      14.1        60       122        60
OIR    2025250     91400   18.3100 -108.8600      14.3        59       121        60
OIR    2025250     91400   18.3100 -108.8700      14.4        59       120        60
OIR    2025250     91400   18.3100 -108.8800      14.4        59       116        60
OIR    2025250     91400   18.3100 -108.8900      14.4        59       115        60
OIR    2025250     91400   18.3100 -108.9000      14.4        59       116        60
OIR    2025250     91400   18.3100 -108.9100      14.4        59       119        60
OIR    2025250     91400   18.3100 -108.9200      14.4        59       121        60
OIR    2025250     91400   18.3100 -108.9300      14.5        59       121        60
OIR    2025250     91400   18.3100 -108.9400      14.5        59       122        60
OIR    2025250     91400   18.3100 -108.9500      14.5        59       122        60
OIR    2025250     91400   18.3100 -108.9600      14.5        59       122        60
OIR    2025250     91400   18.3100 -108.9700      14.5        59       123        60
OIR    2025250     91400   18.3100 -108.9800      14.5        59       125        60
OIR    2025250     91400   18.3100 -108.9900      14.5        59       126        60
OIR    2025250     91400   18.3100 -109.0000      14.6        59       126        60
OIR    2025250     91400   18.3100 -109.0100      14.6        59       125        60
OIR    2025250     91400   18.3100 -109.0200      14.6        59       125        60
OIR    2025250     91400   18.3100 -109.0300      14.6        59       125        60
OIR    2025250     91400   18.3100 -109.0400      14.6        59       124        60
OIR    2025250     91400   18.3100 -109.0500      14.7        59       124        60
OIR    2025250     91400   18.3100 -109.0600      14.7        59       124        60
OIR    2025250     91400   18.3100 -109.0700      14.8        58       125        60
OIR    2025250     91400   18.3100 -109.0800      14.8        58       126        60
OIR    2025250     91400   18.3100 -109.0900      14.9        58       127        60
OIR    2025250     91400   18.3100 -109.1000      14.9        58       127        60
OIR    2025250     91400   18.3100 -109.1100      15.0        58       128        60
OIR    2025250     91400   18.3100 -109.1200      15.1        58       127        60
OIR    2025250     91400   18.3100 -109.1300      15.1        58       126        60
OIR    2025250     91400   18.3100 -109.1400      15.2        58       125        60
OIR    2025250     91400   18.3100 -109.1500      15.2        58       125        60
OIR    2025250     91400   18.3100 -109.1600      15.3        58       125        60
OIR    2025250     91400   18.3100 -109.1700      15.3        58       126        60
OIR    2025250     91400   18.3100 -109.1800      15.3        58       126        60
OIR    2025250     91400   18.3100 -109.1900      15.4        58       126        60
OIR    2025250     91400   18.3100 -109.2000      15.4        58       126        60
OIR    2025250     91400   18.3100 -109.2100      15.5        58       125        60
OIR    2025250     91400   18.3100 -109.2200      15.5        58       126        60
OIR    2025250     91400   18.3100 -109.2300      15.8        58       126        60
OIR    2025250     91400   18.3100 -109.2400      16.6        58       126        60
OIR    2025250     91400   18.3100 -109.2500      18.7        57       125        60
OIR    2025250     91400   18.3100 -109.2600      19.7        57       124        60
OIR    2025250     91400   18.3100 -109.2700      20.5        57       124        60
OIR    2025250     91400   18.3100 -109.2800      20.7        57       123        60
OIR    2025250     91400   18.3100 -109.2900      20.8        57       120        60
OIR    2025250     91400   18.3100 -109.3000      20.8        57       117        60
OIR    2025250     91400   18.3100 -109.3100      20.8        57       116        60
OIR    2025250     91400   18.3100 -109.3200      20.8        56       117        60
OIR    2025250     91400   18.3100 -109.3300      20.7        56       120        60
OIR    2025250     91400   18.3100 -109.3400      20.7        56       123        60
OIR    2025250     91400   18.3100 -109.3500      20.5        57       125        60
OIR    2025250     91400   18.3100 -109.3600      19.9        59       132        60
OIR    2025250     91400   18.3100 -110.8500      16.7        55       143        60
OIR    2025250     91400   18.3100 -110.8600      16.7        55       140        60
OIR    2025250     91400   18.3100 -110.8700      16.7        55       138        60
OIR    2025250     91400   18.3100 -110.8800      16.7        55       139        60
OIR    2025250     91400   18.3100 -110.8900      16.7        55       140        60
OIR    2025250     91400   18.3100 -110.9000      16.8        55       142        60
OIR    2025250     91400   18.3100 -111.2600      12.5        71       142        60
OIR    2025250     91400   18.3100 -111.2700      12.5        71       138        60
OIR    2025250     91400   18.3100 -111.2800      12.5        71       135        60
OIR    2025250     91400   18.3100 -111.2900      12.5        71       132        60
OIR    2025250     91400   18.3100 -111.3000      12.5        71       131        60
OIR    2025250     91400   18.3100 -111.3100      12.5        71       129        60
OIR    2025250     91400   18.3100 -111.3200      12.5        71       129        60
OIR    2025250     91400   18.3100 -111.3300      12.5        71       129        60
OIR    2025250     91400   18.3100 -111.3400      12.4        71       130        60
OIR    2025250     91400   18.3100 -111.3500      12.4        71       127        60
OIR    2025250     91400   18.3100 -111.3600      12.4        72       122        60
OIR    2025250     91400   18.3100 -111.3700      12.4        72       119        60
OIR    2025250     91400   18.3100 -111.3800      12.4        72       116        60
OIR    2025250     91400   18.3100 -111.3900      12.4        72       116        60
OIR    2025250     91400   18.3100 -111.4000      12.4        72       116        60
OIR    2025250     91400   18.3100 -111.4100      12.4        73       116        60
OIR    2025250     91400   18.3100 -111.4200      12.5        73       116        60
OIR    2025250     91400   18.3100 -111.4300      12.4        73       119        60
OIR    2025250     91400   18.3100 -111.4400      12.4        73       120        60
OIR    2025250     91400   18.3100 -111.4500      12.4        74       121        60
OIR    2025250     91400   18.3100 -111.4600      12.4        74       122        60
OIR    2025250     91400   18.3100 -111.4700      12.4        74       117        60
OIR    2025250     91400   18.3100 -111.4800      12.4        74       114        60
OIR    2025250     91400   18.3100 -111.4900      12.4        74       112        60
OIR    2025250     91400   18.3100 -111.5000      12.4        74       113        60
OIR    2025250     91400   18.3100 -111.5100      12.4        74       113        60
OIR    2025250     91400   18.3100 -111.5200      12.3        74       114        60
OIR    2025250     91400   18.3100 -111.5300      12.3        74       115        60
OIR    2025250     91400   18.3100 -111.5400      12.3        74       115        60
OIR    2025250     91400   18.3100 -111.5500      12.3        74       115        60
OIR    2025250     91400   18.3100 -111.5600      12.2        74       113        60
OIR    2025250     91400   18.3100 -111.5700      12.2        74       111        60
OIR    2025250     91400   18.3100 -111.5800      12.1        74       110        60
OIR    2025250     91400   18.3100 -111.5900      11.8        74       109        60
OIR    2025250     91400   18.3100 -111.6000      10.9        74       109        60
OIR    2025250     91400   18.3100 -111.6100       9.6        74       108        60
OIR    2025250     91400   18.3100 -111.6200       9.2        74       107        60
OIR    2025250     91400   18.3100 -111.6300       8.8        75       107        60
OIR    2025250     91400   18.3100 -111.6400       8.7        76       107        60
OIR    2025250     91400   18.3100 -111.6500       8.6        76       108        60
OIR    2025250     91400   18.3100 -111.6600       8.4        77       109        60
OIR    2025250     91400   18.3100 -111.6700       8.1        78       110        60
OIR    2025250     91400   18.3100 -111.6800       7.4        82       110        60
OIR    2025250     91400   18.3100 -111.6900       6.2        87       110        60
OIR    2025250     91400   18.3100 -111.7000       4.8        97       109        60
OIR    2025250     91400   18.3100 -112.2400      12.2        89       142        60
OIR    2025250     91400   18.3100 -112.2500      12.1        89       139        60
OIR    2025250     91400   18.3100 -112.2600      12.1        89       139        60
OIR    2025250     91400   18.3100 -112.2700      12.1        89       142        60
OIR    2025250     91400   18.3100 -112.3000      12.0        89       140        60
OIR    2025250     91400   18.3100 -112.3400      11.4        90       140        60
OIR    2025250     91400   18.3100 -112.3500      10.8        92       136        60
OIR    2025250     91400   18.3100 -112.3600      10.0        94       140        60
OIR    2025250     91400   18.3100 -112.3900       6.8       105       142        60
OIR    2025250     91400   18.3100 -112.4000       6.0       111       141        60
OIR    2025250     91400   18.3100 -112.4100       5.7       114       140        60
OIR    2025250     91400   18.3100 -112.4200       5.6       115       139        60
OIR    2025250     91400   18.3100 -112.4300       5.6       115       139        60
OIR    2025250     91400   18.3100 -112.4400       5.6       115       139        60
OIR    2025250     91400   18.3100 -112.4500       5.5       115       141        60
OIR    2025250     91400   18.3100 -112.4900       5.4       115       142        60
OIR    2025250     91400   18.3100 -112.5000       5.3       115       139        60
OIR    2025250     91400   18.3100 -112.5100       5.3       115       137        60
OIR    2025250     91400   18.3100 -112.5200       5.3       115       137        60
OIR    2025250     91400   18.3100 -112.5300       5.3       115       136        60
OIR    2025250     91400   18.3100 -112.5400       5.2       115       136        60
OIR    2025250     91400   18.3100 -112.5500       5.2       115       135        60
OIR    2025250     91400   18.3100 -112.5600       5.2       115       135        60
OIR    2025250     91400   18.3100 -112.5700       5.1       115       134        60
OIR    2025250     91400   18.3100 -112.5800       5.1       115       133        60
OIR    2025250     91400   18.3100 -112.5900       5.1       115       135        60
OIR    2025250     91400   18.3100 -112.6000       5.0       115       137        60
OIR    2025250     91400   18.3100 -112.6100       5.0       115       136        60
OIR    2025250     91400   18.3100 -112.6200       4.9       115       135        60
OIR    2025250     91400   18.3100 -112.6300       4.9       115       134        60
OIR    2025250     91400   18.3100 -112.6400       4.9       116       133        60
OIR    2025250     91400   18.3100 -112.6500       4.9       116       132        60
OIR    2025250     91400   18.3100 -112.6600       4.9       117       133        60
OIR    2025250     91400   18.3100 -112.6700       4.9       118       135        60
OIR    2025250     91400   18.3100 -112.6800       5.0       119       134        60
OIR    2025250     91400   18.3100 -112.6900       5.0       122       132        60
OIR    2025250     91400   18.3100 -112.7000       5.1       124       131        60
OIR    2025250     91400   18.3100 -112.7100       5.1       125       131        60
OIR    2025250     91400   18.3100 -112.7200       5.2       125       130        60
OIR    2025250     91400   18.3100 -112.7300       5.2       126       130        60
OIR    2025250     91400   18.3100 -112.7400       5.2       126       130        60
OIR    2025250     91400   18.3100 -112.7500       5.2       126       129        60
OIR    2025250     91400   18.3100 -112.7600       5.3       126       128        60
OIR    2025250     91400   18.3100 -112.7700       5.3       126       127        60
OIR    2025250     91400   18.3100 -112.7800       5.3       125       125        60
OIR    2025250     91400   18.3100 -112.7900       5.3       125       124        60
OIR    2025250     91400   18.3100 -112.8000       5.4       125       123        60
OIR    2025250     91400   18.3100 -112.8100       5.5       125       122        60
OIR    2025250     91400   18.3100 -112.8200       5.9       124       123        60
OIR    2025250     91400   18.3100 -112.8300       6.7       124       124        60
OIR    2025250     91400   18.3100 -112.8400       7.0       123       125        60
OIR    2025250     91400   18.3100 -112.8500       7.1       123       125        60
OIR    2025250     91400   18.3100 -112.8600       7.1       122       125        60
OIR    2025250     91400   18.3100 -112.8700       7.2       122       126        60
OIR    2025250     91400   18.3100 -112.8800       7.2       122       126        60
OIR    2025250     91400   18.3100 -112.8900       7.2       121       128        60
OIR    2025250     91400   18.3100 -112.9000       7.2       121       129        60
OIR    2025250     91400   18.3100 -112.9100       7.2       121       129        60
OIR    2025250     91400   18.3100 -112.9200       7.2       121       129        60
OIR    2025250     91400   18.3100 -112.9300       7.2       121       129        60
OIR    2025250     91400   18.3100 -112.9400       7.2       121       127        60
OIR    2025250     91400   18.3100 -112.9500       7.2       120       125        60
OIR    2025250     91400   18.3100 -112.9600       7.2       120       123        60
OIR    2025250     91400   18.3100 -112.9700       7.3       119       122        60
OIR    2025250     91400   18.3100 -112.9800       7.3       118       121        60
OIR    2025250     91400   18.3100 -112.9900       7.4       117       121        60
OIR    2025250     91400   18.3100 -113.0000       7.5       116       121        60
OIR    2025250     91400   18.3100 -113.0100       7.5       115       122        60
OIR    2025250     91400   18.3100 -113.0200       7.5       115       124        60
OIR    2025250     91400   18.3100 -113.0300       7.5       114       127        60
OIR    2025250     91400   18.3100 -113.0400       7.5       114       130        60
OIR    2025250     91400   18.3100 -113.0500       7.5       114       131        60
OIR    2025250     91400   18.3100 -113.0600       7.5       113       132        60
OIR    2025250     91400   18.3100 -113.0700       7.5       113       134        60
OIR    2025250     91400   18.3100 -113.0800       7.4       113       136        60
OIR    2025250     91400   18.3100 -113.0900       7.2       113       137        60
OIR    2025250     91400   18.3100 -113.1000       7.0       112       135        60
OIR    2025250     91400   18.3100 -113.1100       6.9       110       134        60
OIR    2025250     91400   18.3100 -113.1200       6.9       108       134        60
OIR    2025250     91400   18.3100 -113.1300       6.9       107       135        60
OIR    2025250     91400   18.3100 -113.1400       6.6       105       135        60
OIR    2025250     91400   18.3100 -113.1500       6.0       103       133        60
OIR    2025250     91400   18.3100 -113.1600       5.0        99       131        60
OIR    2025250     91400   18.3100 -113.1700       4.3        94       128        60
OIR    2025250     91400   18.3100 -113.1800       4.1        91       126        60
OIR    2025250     91400   18.3100 -113.1900       4.0        90       125        60
OIR    2025250     91400   18.3100 -113.3500       4.1        96       140        60
OIR    2025250     91400   18.3100 -113.3600       5.2        95       143        60
OIR    2025250     91400   18.3100 -113.8800       4.6       153       141        60
OIR    2025250     91400   18.3100 -113.8900       4.5       154       138        60
OIR    2025250     91400   18.3100 -113.9000       4.4       155       136        60
OIR    2025250     91400   18.3100 -113.9100       4.3       155       134        60
OIR    2025250     91400   18.3100 -113.9200       4.3       155       134        60
OIR    2025250     91400   18.3100 -113.9300       4.2       156       135        60
OIR    2025250     91400   18.3100 -113.9400       4.2       156       136        60
OIR    2025250     91400   18.3100 -113.9500       4.0       156       137        60
OIR    2025250     91400   18.3100 -114.2800       4.3       255       135        60
OIR    2025250     91400   18.3100 -114.2900       5.2       255       141        60
OIR    2025250     91400   18.3000 -108.6200      14.0        53       140        60
OIR    2025250     91400   18.3000 -108.6300      14.0        53       138        60
OIR    2025250     91400   18.3000 -108.6400      13.9        53       137        60
OIR    2025250     91400   18.3000 -108.6500      13.8        53       138        60
OIR    2025250     91400   18.3000 -108.7100      13.8        56       141        60
OIR    2025250     91400   18.3000 -108.7200      13.9        56       137        60
OIR    2025250     91400   18.3000 -108.7300      13.9        58       134        60
OIR    2025250     91400   18.3000 -108.7400      13.9        58       132        60
OIR    2025250     91400   18.3000 -108.7500      13.9        59       129        60
OIR    2025250     91400   18.3000 -108.7600      13.9        59       128        60
OIR    2025250     91400   18.3000 -108.7700      13.8        60       126        60
OIR    2025250     91400   18.3000 -108.7800      13.8        61       126        60
OIR    2025250     91400   18.3000 -108.7900      13.6        62       126        60
OIR    2025250     91400   18.3000 -108.8000      13.1        63       126        60
OIR    2025250     91400   18.3000 -108.8100      12.8        64       126        60
OIR    2025250     91400   18.3000 -108.8200      12.6        65       125        60
OIR    2025250     91400   18.3000 -108.8300      12.6        65       126        60
OIR    2025250     91400   18.3000 -108.8400      12.5        64       126        60
OIR    2025250     91400   18.3000 -108.8500      13.0        62       125        60
OIR    2025250     91400   18.3000 -108.8600      13.4        60       124        60
OIR    2025250     91400   18.3000 -108.8700      14.0        59       123        60
OIR    2025250     91400   18.3000 -108.8800      14.3        59       121        60
OIR    2025250     91400   18.3000 -108.8900      14.4        59       117        60
OIR    2025250     91400   18.3000 -108.9000      14.4        59       117        60
OIR    2025250     91400   18.3000 -108.9100      14.4        59       120        60
OIR    2025250     91400   18.3000 -108.9200      14.4        59       121        60
OIR    2025250     91400   18.3000 -108.9300      14.4        59       121        60
OIR    2025250     91400   18.3000 -108.9400      14.4        59       121        60
OIR    2025250     91400   18.3000 -108.9500      14.4        59       122        60
OIR    2025250     91400   18.3000 -108.9600      14.5        59       123        60
OIR    2025250     91400   18.3000 -108.9700      14.5        59       124        60
OIR    2025250     91400   18.3000 -108.9800      14.5        59       125        60
OIR    2025250     91400   18.3000 -108.9900      14.5        59       126        60
OIR    2025250     91400   18.3000 -109.0000      14.6        59       126        60
OIR    2025250     91400   18.3000 -109.0100      14.6        59       126        60
OIR    2025250     91400   18.3000 -109.0200      14.6        59       126        60
OIR    2025250     91400   18.3000 -109.0300      14.6        59       125        60
OIR    2025250     91400   18.3000 -109.0400      14.6        59       125        60
OIR    2025250     91400   18.3000 -109.0500      14.7        59       125        60
OIR    2025250     91400   18.3000 -109.0600      14.7        59       125        60
OIR    2025250     91400   18.3000 -109.0700      14.7        59       125        60
OIR    2025250     91400   18.3000 -109.0800      14.8        59       126        60
OIR    2025250     91400   18.3000 -109.0900      14.8        58       127        60
OIR    2025250     91400   18.3000 -109.1000      14.9        58       127        60
OIR    2025250     91400   18.3000 -109.1100      14.9        58       126        60
OIR    2025250     91400   18.3000 -109.1200      15.0        58       126        60
OIR    2025250     91400   18.3000 -109.1300      15.0        58       125        60
OIR    2025250     91400   18.3000 -109.1400      15.1        58       125        60
OIR    2025250     91400   18.3000 -109.1500      15.2        58       125        60
OIR    2025250     91400   18.3000 -109.1600      15.2        58       126        60
OIR    2025250     91400   18.3000 -109.1700      15.3        58       126        60
OIR    2025250     91400   18.3000 -109.1800      15.3        58       127        60
OIR    2025250     91400   18.3000 -109.1900      15.4        58       127        60
OIR    2025250     91400   18.3000 -109.2000      15.4        58       126        60
OIR    2025250     91400   18.3000 -109.2100      15.5        58       126        60
OIR    2025250     91400   18.3000 -109.2200      15.6        58       127        60
OIR    2025250     91400   18.3000 -109.2300      16.3        58       128        60
OIR    2025250     91400   18.3000 -109.2400      17.5        58       128        60
OIR    2025250     91400   18.3000 -109.2500      19.7        58       128        60
OIR    2025250     91400   18.3000 -109.2600      20.3        57       127        60
OIR    2025250     91400   18.3000 -109.2700      20.7        57       126        60
OIR    2025250     91400   18.3000 -109.2800      20.8        57       124        60
OIR    2025250     91400   18.3000 -109.2900      20.9        57       122        60
OIR    2025250     91400   18.3000 -109.3000      20.9        57       119        60
OIR    2025250     91400   18.3000 -109.3100      20.9        57       116        60
OIR    2025250     91400   18.3000 -109.3200      20.9        57       119        60
OIR    2025250     91400   18.3000 -109.3300      20.8        56       122        60
OIR    2025250     91400   18.3000 -109.3400      20.7        56       123        60
OIR    2025250     91400   18.3000 -109.3500      20.4        57       125        60
OIR    2025250     91400   18.3000 -109.3600      20.0        59       129        60
OIR    2025250     91400   18.3000 -109.3700      19.6        59       140        60
OIR    2025250     91400   18.3000 -110.8700      16.7        55       141        60
OIR    2025250     91400   18.3000 -110.8800      16.7        55       141        60
OIR    2025250     91400   18.3000 -110.8900      16.7        55       141        60
OIR    2025250     91400   18.3000 -110.9000      16.7        55       141        60
OIR    2025250     91400   18.3000 -110.9100      16.8        55       143        60
OIR    2025250     91400   18.3000 -111.2600      12.5        71       141        60
OIR    2025250     91400   18.3000 -111.2700      12.5        71       138        60
OIR    2025250     91400   18.3000 -111.2800      12.5        71       135        60
OIR    2025250     91400   18.3000 -111.2900      12.5        71       133        60
OIR    2025250     91400   18.3000 -111.3000      12.5        71       131        60
OIR    2025250     91400   18.3000 -111.3100      12.5        71       130        60
OIR    2025250     91400   18.3000 -111.3200      12.5        71       129        60
OIR    2025250     91400   18.3000 -111.3300      12.4        71       129        60
OIR    2025250     91400   18.3000 -111.3400      12.4        71       128        60
OIR    2025250     91400   18.3000 -111.3500      12.4        72       125        60
OIR    2025250     91400   18.3000 -111.3600      12.4        72       120        60
OIR    2025250     91400   18.3000 -111.3700      12.4        72       115        60
OIR    2025250     91400   18.3000 -111.3800      12.4        72       114        60
OIR    2025250     91400   18.3000 -111.3900      12.4        72       113        60
OIR    2025250     91400   18.3000 -111.4000      12.4        73       114        60
OIR    2025250     91400   18.3000 -111.4100      12.4        73       115        60
OIR    2025250     91400   18.3000 -111.4200      12.4        73       116        60
OIR    2025250     91400   18.3000 -111.4300      12.4        74       116        60
OIR    2025250     91400   18.3000 -111.4400      12.4        74       117        60
OIR    2025250     91400   18.3000 -111.4500      12.4        74       117        60
OIR    2025250     91400   18.3000 -111.4600      12.4        74       116        60
OIR    2025250     91400   18.3000 -111.4700      12.4        74       115        60
OIR    2025250     91400   18.3000 -111.4800      12.4        74       112        60
OIR    2025250     91400   18.3000 -111.4900      12.4        74       110        60
OIR    2025250     91400   18.3000 -111.5000      12.3        74       112        60
OIR    2025250     91400   18.3000 -111.5100      12.3        74       113        60
OIR    2025250     91400   18.3000 -111.5200      12.3        74       112        60
OIR    2025250     91400   18.3000 -111.5300      12.3        74       112        60
OIR    2025250     91400   18.3000 -111.5400      12.2        74       112        60
OIR    2025250     91400   18.3000 -111.5500      12.2        74       111        60
OIR    2025250     91400   18.3000 -111.5600      12.2        74       111        60
OIR    2025250     91400   18.3000 -111.5700      12.1        74       109        60
OIR    2025250     91400   18.3000 -111.5800      11.9        74       108        60
OIR    2025250     91400   18.3000 -111.5900      11.5        73       107        60
OIR    2025250     91400   18.3000 -111.6000      10.4        73       107        60
OIR    2025250     91400   18.3000 -111.6100       9.3        74       105        60
OIR    2025250     91400   18.3000 -111.6200       9.0        75       104        60
OIR    2025250     91400   18.3000 -111.6300       8.7        75       104        60
OIR    2025250     91400   18.3000 -111.6400       8.6        76       104        60
OIR    2025250     91400   18.3000 -111.6500       8.6        76       105        60
OIR    2025250     91400   18.3000 -111.6600       8.4        77       105        60
OIR    2025250     91400   18.3000 -111.6700       7.9        79       107        60
OIR    2025250     91400   18.3000 -111.6800       7.2        83       107        60
OIR    2025250     91400   18.3000 -111.6900       6.0        89       108        60
OIR    2025250     91400   18.3000 -111.7000       4.7       102       108        60
OIR    2025250     91400   18.3000 -111.7100       4.0       119       108        60
OIR    2025250     91400   18.3000 -112.2400      12.2        89       142        60
OIR    2025250     91400   18.3000 -112.2500      12.2        89       139        60
OIR    2025250     91400   18.3000 -112.2600      12.1        89       139        60
OIR    2025250     91400   18.3000 -112.2700      12.1        89       142        60
OIR    2025250     91400   18.3000 -112.3000      12.0        88       142        60
OIR    2025250     91400   18.3000 -112.3100      12.0        88       142        60
OIR    2025250     91400   18.3000 -112.3400      11.7        89       138        60
OIR    2025250     91400   18.3000 -112.3500      11.2        90       135        60
OIR    2025250     91400   18.3000 -112.3600      10.3        93       139        60
OIR    2025250     91400   18.3000 -112.4200       5.7       115       140        60
OIR    2025250     91400   18.3000 -112.4300       5.7       115       140        60
OIR    2025250     91400   18.3000 -112.4400       5.6       115       139        60
OIR    2025250     91400   18.3000 -112.4500       5.6       115       140        60
OIR    2025250     91400   18.3000 -112.4600       5.5       115       141        60
OIR    2025250     91400   18.3000 -112.4800       5.4       115       140        60
OIR    2025250     91400   18.3000 -112.4900       5.4       115       139        60
OIR    2025250     91400   18.3000 -112.5000       5.3       115       137        60
OIR    2025250     91400   18.3000 -112.5100       5.3       115       135        60
OIR    2025250     91400   18.3000 -112.5200       5.3       115       135        60
OIR    2025250     91400   18.3000 -112.5300       5.3       115       135        60
OIR    2025250     91400   18.3000 -112.5400       5.2       115       136        60
OIR    2025250     91400   18.3000 -112.5500       5.2       115       135        60
OIR    2025250     91400   18.3000 -112.5600       5.2       115       135        60
OIR    2025250     91400   18.3000 -112.5700       5.1       115       134        60
OIR    2025250     91400   18.3000 -112.5800       5.1       115       132        60
OIR    2025250     91400   18.3000 -112.5900       5.1       115       134        60
OIR    2025250     91400   18.3000 -112.6000       5.0       115       136        60
OIR    2025250     91400   18.3000 -112.6100       5.0       115       136        60
OIR    2025250     91400   18.3000 -112.6200       5.0       115       135        60
OIR    2025250     91400   18.3000 -112.6300       5.0       115       134        60
OIR    2025250     91400   18.3000 -112.6400       4.9       116       133        60
OIR    2025250     91400   18.3000 -112.6500       4.9       116       133        60
OIR    2025250     91400   18.3000 -112.6600       4.9       117       134        60
OIR    2025250     91400   18.3000 -112.6700       5.0       118       135        60
OIR    2025250     91400   18.3000 -112.6800       5.0       120       135        60
OIR    2025250     91400   18.3000 -112.6900       5.1       123       133        60
OIR    2025250     91400   18.3000 -112.7000       5.2       125       131        60
OIR    2025250     91400   18.3000 -112.7100       5.2       125       131        60
OIR    2025250     91400   18.3000 -112.7200       5.2       126       131        60
OIR    2025250     91400   18.3000 -112.7300       5.2       126       131        60
OIR    2025250     91400   18.3000 -112.7400       5.2       126       131        60
OIR    2025250     91400   18.3000 -112.7500       5.3       126       130        60
OIR    2025250     91400   18.3000 -112.7600       5.3       126       129        60
OIR    2025250     91400   18.3000 -112.7700       5.3       126       127        60
OIR    2025250     91400   18.3000 -112.7800       5.3       126       126        60
OIR    2025250     91400   18.3000 -112.7900       5.4       126       124        60
OIR    2025250     91400   18.3000 -112.8000       5.5       125       123        60
OIR    2025250     91400   18.3000 -112.8100       5.8       125       121        60
OIR    2025250     91400   18.3000 -112.8200       6.2       124       122        60
OIR    2025250     91400   18.3000 -112.8300       6.9       123       124        60
OIR    2025250     91400   18.3000 -112.8400       7.0       123       126        60
OIR    2025250     91400   18.3000 -112.8500       7.1       123       127        60
OIR    2025250     91400   18.3000 -112.8600       7.2       122       129        60
OIR    2025250     91400   18.3000 -112.8700       7.2       122       130        60
OIR    2025250     91400   18.3000 -112.8800       7.2       122       130        60
OIR    2025250     91400   18.3000 -112.8900       7.2       121       131        60
OIR    2025250     91400   18.3000 -112.9000       7.2       121       132        60
OIR    2025250     91400   18.3000 -112.9100       7.2       121       131        60
OIR    2025250     91400   18.3000 -112.9200       7.2       121       128        60
OIR    2025250     91400   18.3000 -112.9300       7.2       121       126        60
OIR    2025250     91400   18.3000 -112.9400       7.2       121       125        60
OIR    2025250     91400   18.3000 -112.9500       7.2       120       125        60
OIR    2025250     91400   18.3000 -112.9600       7.2       120       123        60
OIR    2025250     91400   18.3000 -112.9700       7.3       119       122        60
OIR    2025250     91400   18.3000 -112.9800       7.4       118       121        60
OIR    2025250     91400   18.3000 -112.9900       7.5       117       121        60
OIR    2025250     91400   18.3000 -113.0000       7.6       116       121        60
OIR    2025250     91400   18.3000 -113.0100       7.6       115       122        60
OIR    2025250     91400   18.3000 -113.0200       7.6       114       124        60
OIR    2025250     91400   18.3000 -113.0300       7.6       114       127        60
OIR    2025250     91400   18.3000 -113.0400       7.6       114       131        60
OIR    2025250     91400   18.3000 -113.0500       7.6       114       133        60
OIR    2025250     91400   18.3000 -113.0600       7.6       114       133        60
OIR    2025250     91400   18.3000 -113.0700       7.5       114       134        60
OIR    2025250     91400   18.3000 -113.0800       7.5       113       138        60
OIR    2025250     91400   18.3000 -113.0900       7.4       113       141        60
OIR    2025250     91400   18.3000 -113.1000       7.4       113       138        60
OIR    2025250     91400   18.3000 -113.1100       7.3       111       135        60
OIR    2025250     91400   18.3000 -113.1200       7.3       109       133        60
OIR    2025250     91400   18.3000 -113.1300       7.3       108       132        60
OIR    2025250     91400   18.3000 -113.1400       7.2       107       131        60
OIR    2025250     91400   18.3000 -113.1500       6.8       106       131        60
OIR    2025250     91400   18.3000 -113.1600       5.9       103       131        60
OIR    2025250     91400   18.3000 -113.1700       4.8        97       128        60
OIR    2025250     91400   18.3000 -113.1800       4.3        92       126        60
OIR    2025250     91400   18.3000 -113.1900       4.1        89       125        60
OIR    2025250     91400   18.3000 -113.2000       4.0        87       125        60
OIR    2025250     91400   18.3000 -113.3500       4.5        95       141        60
OIR    2025250     91400   18.3000 -113.3600       5.6        95       143        60
OIR    2025250     91400   18.3000 -113.8600       4.8       156       141        60
OIR    2025250     91400   18.3000 -113.8700       4.7       155       138        60
OIR    2025250     91400   18.3000 -113.8800       4.5       155       137        60
OIR    2025250     91400   18.3000 -113.8900       4.4       155       135        60
OIR    2025250     91400   18.3000 -113.9000       4.4       155       136        60
OIR    2025250     91400   18.3000 -113.9100       4.3       156       137        60
OIR    2025250     91400   18.3000 -113.9200       4.2       156       137        60
OIR    2025250     91400   18.3000 -113.9300       4.2       156       137        60
OIR    2025250     91400   18.3000 -113.9400       4.2       156       137        60
OIR    2025250     91400   18.3000 -114.2700       4.0       256       129        60
OIR    2025250     91400   18.3000 -114.2800       4.4       256       133        60
OIR    2025250     91400   18.3000 -114.2900       5.2       257       141        60
OIR    2025250     91400   18.2900 -108.6200      14.0        53       140        60
OIR    2025250     91400   18.2900 -108.6300      14.0        53       138        60
OIR    2025250     91400   18.2900 -108.6400      13.9        53       136        60
OIR    2025250     91400   18.2900 -108.6500      13.7        53       137        60
OIR    2025250     91400   18.2900 -108.7200      13.7        56       140        60
OIR    2025250     91400   18.2900 -108.7300      13.8        57       137        60
OIR    2025250     91400   18.2900 -108.7400      13.8        58       134        60
OIR    2025250     91400   18.2900 -108.7500      13.8        59       132        60
OIR    2025250     91400   18.2900 -108.7600      13.8        60       131        60
OIR    2025250     91400   18.2900 -108.7700      13.7        60       130        60
OIR    2025250     91400   18.2900 -108.7800      13.7        61       129        60
OIR    2025250     91400   18.2900 -108.7900      13.4        63       129        60
OIR    2025250     91400   18.2900 -108.8000      12.7        66       128        60
OIR    2025250     91400   18.2900 -108.8100      12.1        67       129        60
OIR    2025250     91400   18.2900 -108.8200      11.8        67       130        60
OIR    2025250     91400   18.2900 -108.8300      11.7        67       130        60
OIR    2025250     91400   18.2900 -108.8400      11.5        67       129        60
OIR    2025250     91400   18.2900 -108.8500      11.4        67       129        60
OIR    2025250     91400   18.2900 -108.8600      11.5        66       128        60
OIR    2025250     91400   18.2900 -108.8700      12.2        63       127        60
OIR    2025250     91400   18.2900 -108.8800      12.9        61       125        60
OIR    2025250     91400   18.2900 -108.8900      13.7        60       123        60
OIR    2025250     91400   18.2900 -108.9000      14.2        59       121        60
OIR    2025250     91400   18.2900 -108.9100      14.3        59       121        60
OIR    2025250     91400   18.2900 -108.9200      14.4        59       122        60
OIR    2025250     91400   18.2900 -108.9300      14.4        59       122        60
OIR    2025250     91400   18.2900 -108.9400      14.4        59       123        60
OIR    2025250     91400   18.2900 -108.9500      14.4        59       123        60
OIR    2025250     91400   18.2900 -108.9600      14.4        59       124        60
OIR    2025250     91400   18.2900 -108.9700      14.5        59       124        60
OIR    2025250     91400   18.2900 -108.9800      14.5        59       125        60
OIR    2025250     91400   18.2900 -108.9900      14.5        59       127        60
OIR    2025250     91400   18.2900 -109.0000      14.5        59       127        60
OIR    2025250     91400   18.2900 -109.0100      14.6        59       126        60
OIR    2025250     91400   18.2900 -109.0200      14.6        59       126        60
OIR    2025250     91400   18.2900 -109.0300      14.6        59       126        60
OIR    2025250     91400   18.2900 -109.0400      14.6        59       126        60
OIR    2025250     91400   18.2900 -109.0500      14.6        59       126        60
OIR    2025250     91400   18.2900 -109.0600      14.7        59       126        60
OIR    2025250     91400   18.2900 -109.0700      14.7        59       126        60
OIR    2025250     91400   18.2900 -109.0800      14.7        59       127        60
OIR    2025250     91400   18.2900 -109.0900      14.8        59       128        60
OIR    2025250     91400   18.2900 -109.1000      14.8        59       127        60
OIR    2025250     91400   18.2900 -109.1100      14.9        59       126        60
OIR    2025250     91400   18.2900 -109.1200      14.9        58       125        60
OIR    2025250     91400   18.2900 -109.1300      15.0        58       125        60
OIR    2025250     91400   18.2900 -109.1400      15.0        58       125        60
OIR    2025250     91400   18.2900 -109.1500      15.1        58       125        60
OIR    2025250     91400   18.2900 -109.1600      15.1        58       126        60
OIR    2025250     91400   18.2900 -109.1700      15.2        58       127        60
OIR    2025250     91400   18.2900 -109.1800      15.3        58       128        60
OIR    2025250     91400   18.2900 -109.1900      15.3        58       128        60
OIR    2025250     91400   18.2900 -109.2000      15.4        59       127        60
OIR    2025250     91400   18.2900 -109.2100      15.5        59       126        60
OIR    2025250     91400   18.2900 -109.2200      15.8        59       127        60
OIR    2025250     91400   18.2900 -109.2300      16.7        59       129        60
OIR    2025250     91400   18.2900 -109.2400      18.1        59       130        60
OIR    2025250     91400   18.2900 -109.2500      20.2        58       131        60
OIR    2025250     91400   18.2900 -109.2600      20.5        58       131        60
OIR    2025250     91400   18.2900 -109.2700      20.8        58       129        60
OIR    2025250     91400   18.2900 -109.2800      20.9        57       126        60
OIR    2025250     91400   18.2900 -109.2900      21.0        57       123        60
OIR    2025250     91400   18.2900 -109.3000      21.0        57       120        60
OIR    2025250     91400   18.2900 -109.3100      20.9        57       116        60
OIR    2025250     91400   18.2900 -109.3200      20.9        57       120        60
OIR    2025250     91400   18.2900 -109.3300      20.9        56       123        60
OIR    2025250     91400   18.2900 -109.3400      20.8        57       125        60
OIR    2025250     91400   18.2900 -109.3500      20.3        58       126        60
OIR    2025250     91400   18.2900 -109.3600      20.0        59       128        60
OIR    2025250     91400   18.2900 -109.3700      19.7        59       137        60
OIR    2025250     91400   18.2900 -110.8900      16.7        55       142        60
OIR    2025250     91400   18.2900 -110.9000      16.7        55       142        60
OIR    2025250     91400   18.2900 -110.9100      16.8        55       142        60
OIR    2025250     91400   18.2900 -110.9200      16.8        55       143        60
OIR    2025250     91400   18.2900 -111.2600      12.5        71       141        60
OIR    2025250     91400   18.2900 -111.2700      12.5        71       138        60
OIR    2025250     91400   18.2900 -111.2800      12.5        71       135        60
OIR    2025250     91400   18.2900 -111.2900      12.5        71       133        60
OIR    2025250     91400   18.2900 -111.3000      12.5        71       132        60
OIR    2025250     91400   18.2900 -111.3100      12.5        71       130        60
OIR    2025250     91400   18.2900 -111.3200      12.4        71       129        60
OIR    2025250     91400   18.2900 -111.3300      12.4        72       128        60
OIR    2025250     91400   18.2900 -111.3400      12.4        72       126        60
OIR    2025250     91400   18.2900 -111.3500      12.4        72       124        60
OIR    2025250     91400   18.2900 -111.3600      12.4        72       120        60
OIR    2025250     91400   18.2900 -111.3700      12.3        72       116        60
OIR    2025250     91400   18.2900 -111.3800      12.3        73       115        60
OIR    2025250     91400   18.2900 -111.3900      12.3        73       114        60
OIR    2025250     91400   18.2900 -111.4000      12.3        73       114        60
OIR    2025250     91400   18.2900 -111.4100      12.3        74       114        60
OIR    2025250     91400   18.2900 -111.4200      12.3        74       115        60
OIR    2025250     91400   18.2900 -111.4300      12.3        74       115        60
OIR    2025250     91400   18.2900 -111.4400      12.4        74       116        60
OIR    2025250     91400   18.2900 -111.4500      12.4        74       115        60
OIR    2025250     91400   18.2900 -111.4600      12.4        74       115        60
OIR    2025250     91400   18.2900 -111.4700      12.4        74       113        60
OIR    2025250     91400   18.2900 -111.4800      12.3        74       112        60
OIR    2025250     91400   18.2900 -111.4900      12.3        74       110        60
OIR    2025250     91400   18.2900 -111.5000      12.3        74       111        60
OIR    2025250     91400   18.2900 -111.5100      12.3        74       111        60
OIR    2025250     91400   18.2900 -111.5200      12.3        74       111        60
OIR    2025250     91400   18.2900 -111.5300      12.2        74       111        60
OIR    2025250     91400   18.2900 -111.5400      12.2        74       111        60
OIR    2025250     91400   18.2900 -111.5500      12.1        74       109        60
OIR    2025250     91400   18.2900 -111.5600      12.1        74       108        60
OIR    2025250     91400   18.2900 -111.5700      12.0        74       107        60
OIR    2025250     91400   18.2900 -111.5800      11.6        73       105        60
OIR    2025250     91400   18.2900 -111.5900      11.0        73       105        60
OIR    2025250     91400   18.2900 -111.6000       9.8        73       105        60
OIR    2025250     91400   18.2900 -111.6100       9.0        75       105        60
OIR    2025250     91400   18.2900 -111.6200       8.8        75       104        60
OIR    2025250     91400   18.2900 -111.6300       8.7        76       104        60
OIR    2025250     91400   18.2900 -111.6400       8.6        76       104        60
OIR    2025250     91400   18.2900 -111.6500       8.6        76       104        60
OIR    2025250     91400   18.2900 -111.6600       8.3        77       104        60
OIR    2025250     91400   18.2900 -111.6700       7.8        79       104        60
OIR    2025250     91400   18.2900 -111.6800       7.1        83       104        60
OIR    2025250     91400   18.2900 -111.6900       5.9        90       105        60
OIR    2025250     91400   18.2900 -111.7000       4.5       105       107        60
OIR    2025250     91400   18.2900 -111.7100       4.2       118       108        60
OIR    2025250     91400   18.2900 -111.7200       4.2       134       108        60
OIR    2025250     91400   18.2900 -111.7300       4.2       139       109        60
OIR    2025250     91400   18.2900 -111.7400       4.1       141       110        60
OIR    2025250     91400   18.2900 -111.7500       4.1       143       111        60
OIR    2025250     91400   18.2900 -111.7600       4.0       147       111        60
OIR    2025250     91400   18.2900 -111.7900       4.3       117       120        60
OIR    2025250     91400   18.2900 -111.8000       4.9       106       126        60
OIR    2025250     91400   18.2900 -111.8100       5.4        99       134        60
OIR    2025250     91400   18.2900 -111.8200       6.4        89       141        60
OIR    2025250     91400   18.2900 -112.2000      12.2        89       143        60
OIR    2025250     91400   18.2900 -112.2100      12.2        89       142        60
OIR    2025250     91400   18.2900 -112.2200      12.2        89       141        60
OIR    2025250     91400   18.2900 -112.2300      12.2        89       142        60
OIR    2025250     91400   18.2900 -112.2400      12.2        89       141        60
OIR    2025250     91400   18.2900 -112.2500      12.2        89       138        60
OIR    2025250     91400   18.2900 -112.2600      12.2        89       137        60
OIR    2025250     91400   18.2900 -112.2700      12.2        89       140        60
OIR    2025250     91400   18.2900 -112.2900      12.1        88       142        60
OIR    2025250     91400   18.2900 -112.3000      12.0        88       140        60
OIR    2025250     91400   18.2900 -112.3100      12.0        88       138        60
OIR    2025250     91400   18.2900 -112.3200      12.0        88       139        60
OIR    2025250     91400   18.2900 -112.3300      11.9        88       139        60
OIR    2025250     91400   18.2900 -112.3400      11.8        88       137        60
OIR    2025250     91400   18.2900 -112.3500      11.6        89       134        60
OIR    2025250     91400   18.2900 -112.3600      10.9        91       138        60
OIR    2025250     91400   18.2900 -112.4200       5.9       115       141        60
OIR    2025250     91400   18.2900 -112.4300       5.8       115       140        60
OIR    2025250     91400   18.2900 -112.4400       5.7       115       138        60
OIR    2025250     91400   18.2900 -112.4500       5.6       115       138        60
OIR    2025250     91400   18.2900 -112.4600       5.5       115       139        60
OIR    2025250     91400   18.2900 -112.4700       5.5       115       140        60
OIR    2025250     91400   18.2900 -112.4800       5.4       115       137        60
OIR    2025250     91400   18.2900 -112.4900       5.4       115       135        60
OIR    2025250     91400   18.2900 -112.5000       5.4       115       133        60
OIR    2025250     91400   18.2900 -112.5100       5.3       115       132        60
OIR    2025250     91400   18.2900 -112.5200       5.3       115       132        60
OIR    2025250     91400   18.2900 -112.5300       5.3       115       134        60
OIR    2025250     91400   18.2900 -112.5400       5.2       115       135        60
OIR    2025250     91400   18.2900 -112.5500       5.2       115       135        60
OIR    2025250     91400   18.2900 -112.5600       5.2       115       135        60
OIR    2025250     91400   18.2900 -112.5700       5.1       115       134        60
OIR    2025250     91400   18.2900 -112.5800       5.1       115       132        60
OIR    2025250     91400   18.2900 -112.5900       5.1       115       132        60
OIR    2025250     91400   18.2900 -112.6000       5.0       115       133        60
OIR    2025250     91400   18.2900 -112.6100       5.0       115       134        60
OIR    2025250     91400   18.2900 -112.6200       5.0       116       134        60
OIR    2025250     91400   18.2900 -112.6300       5.0       116       134        60
OIR    2025250     91400   18.2900 -112.6400       5.0       116       134        60
OIR    2025250     91400   18.2900 -112.6500       5.0       117       134        60
OIR    2025250     91400   18.2900 -112.6600       5.0       117       134        60
OIR    2025250     91400   18.2900 -112.6700       5.0       119       136        60
OIR    2025250     91400   18.2900 -112.6800       5.1       122       136        60
OIR    2025250     91400   18.2900 -112.6900       5.2       124       134        60
OIR    2025250     91400   18.2900 -112.7000       5.2       125       132        60
OIR    2025250     91400   18.2900 -112.7100       5.2       126       132        60
OIR    2025250     91400   18.2900 -112.7200       5.2       126       132        60
OIR    2025250     91400   18.2900 -112.7300       5.2       126       132        60
OIR    2025250     91400   18.2900 -112.7400       5.2       126       132        60
OIR    2025250     91400   18.2900 -112.7500       5.3       126       131        60
OIR    2025250     91400   18.2900 -112.7600       5.3       126       130        60
OIR    2025250     91400   18.2900 -112.7700       5.3       126       129        60
OIR    2025250     91400   18.2900 -112.7800       5.4       126       127        60
OIR    2025250     91400   18.2900 -112.7900       5.4       126       125        60
OIR    2025250     91400   18.2900 -112.8000       5.8       125       123        60
OIR    2025250     91400   18.2900 -112.8100       6.3       125       121        60
OIR    2025250     91400   18.2900 -112.8200       6.4       125       122        60
OIR    2025250     91400   18.2900 -112.8300       6.8       124       125        60
OIR    2025250     91400   18.2900 -112.8400       7.1       123       127        60
OIR    2025250     91400   18.2900 -112.8500       7.2       122       129        60
OIR    2025250     91400   18.2900 -112.8600       7.2       122       130        60
OIR    2025250     91400   18.2900 -112.8700       7.2       122       131        60
OIR    2025250     91400   18.2900 -112.8800       7.2       122       132        60
OIR    2025250     91400   18.2900 -112.8900       7.2       121       132        60
OIR    2025250     91400   18.2900 -112.9000       7.2       121       132        60
OIR    2025250     91400   18.2900 -112.9100       7.2       121       132        60
OIR    2025250     91400   18.2900 -112.9200       7.2       121       129        60
OIR    2025250     91400   18.2900 -112.9300       7.2       121       126        60
OIR    2025250     91400   18.2900 -112.9400       7.2       121       125        60
OIR    2025250     91400   18.2900 -112.9500       7.2       120       124        60
OIR    2025250     91400   18.2900 -112.9600       7.3       120       124        60
OIR    2025250     91400   18.2900 -112.9700       7.4       119       123        60
OIR    2025250     91400   18.2900 -112.9800       7.5       118       122        60
OIR    2025250     91400   18.2900 -112.9900       7.6       117       121        60
OIR    2025250     91400   18.2900 -113.0000       7.7       116       121        60
OIR    2025250     91400   18.2900 -113.0100       7.7       115       122        60
OIR    2025250     91400   18.2900 -113.0200       7.6       114       123        60
OIR    2025250     91400   18.2900 -113.0300       7.6       114       127        60
OIR    2025250     91400   18.2900 -113.0400       7.6       114       131        60
OIR    2025250     91400   18.2900 -113.0500       7.6       114       134        60
OIR    2025250     91400   18.2900 -113.0600       7.6       114       135        60
OIR    2025250     91400   18.2900 -113.0700       7.5       114       135        60
OIR    2025250     91400   18.2900 -113.0800       7.5       114       139        60
OIR    2025250     91400   18.2900 -113.0900       7.5       113       143        60
OIR    2025250     91400   18.2900 -113.1000       7.5       113       141        60
OIR    2025250     91400   18.2900 -113.1100       7.5       111       137        60
OIR    2025250     91400   18.2900 -113.1200       7.5       109       134        60
OIR    2025250     91400   18.2900 -113.1300       7.4       109       130        60
OIR    2025250     91400   18.2900 -113.1400       7.4       108       126        60
OIR    2025250     91400   18.2900 -113.1500       7.2       107       127        60
OIR    2025250     91400   18.2900 -113.1600       6.5       105       129        60
OIR    2025250     91400   18.2900 -113.1700       5.5       100       128        60
OIR    2025250     91400   18.2900 -113.1800       4.6        93       126        60
OIR    2025250     91400   18.2900 -113.1900       4.1        88       126        60
OIR    2025250     91400   18.2900 -113.2000       4.0        86       127        60
OIR    2025250     91400   18.2900 -113.3400       4.0        94       140        60
OIR    2025250     91400   18.2900 -113.3500       4.8        93       143        60
OIR    2025250     91400   18.2900 -113.5700       4.1       144       143        60
OIR    2025250     91400   18.2900 -113.7900       4.3       179       140        60
OIR    2025250     91400   18.2900 -113.8300       4.8       172       142        60
OIR    2025250     91400   18.2900 -113.8400       4.8       167       141        60
OIR    2025250     91400   18.2900 -113.8500       4.8       162       139        60
OIR    2025250     91400   18.2900 -113.8600       4.7       159       136        60
OIR    2025250     91400   18.2900 -113.8700       4.6       157       132        60
OIR    2025250     91400   18.2900 -113.8800       4.5       156       132        60
OIR    2025250     91400   18.2900 -113.8900       4.4       156       131        60
OIR    2025250     91400   18.2900 -113.9000       4.3       156       134        60
OIR    2025250     91400   18.2900 -113.9100       4.3       156       139        60
OIR    2025250     91400   18.2900 -113.9200       4.2       156       141        60
OIR    2025250     91400   18.2900 -113.9300       4.2       156       141        60
OIR    2025250     91400   18.2900 -113.9400       4.1       156       140        60
OIR    2025250     91400   18.2900 -114.2700       4.0       257       129        60
OIR    2025250     91400   18.2900 -114.2800       4.4       257       130        60
OIR    2025250     91400   18.2900 -114.2900       5.1       257       137        60
OIR    2025250     91400   18.2800 -108.6300      13.9        53       141        60
OIR    2025250     91400   18.2800 -108.6400      13.8        53       139        60
OIR    2025250     91400   18.2800 -108.6500      13.4        54       136        60
OIR    2025250     91400   18.2800 -108.6600      13.3        54       141        60
OIR    2025250     91400   18.2800 -108.7300      13.7        56       140        60
OIR    2025250     91400   18.2800 -108.7400      13.7        57       138        60
OIR    2025250     91400   18.2800 -108.7500      13.7        58       135        60
OIR    2025250     91400   18.2800 -108.7600      13.7        60       134        60
OIR    2025250     91400   18.2800 -108.7700      13.6        61       133        60
OIR    2025250     91400   18.2800 -108.7800      13.5        62       132        60
OIR    2025250     91400   18.2800 -108.7900      13.2        65       131        60
OIR    2025250     91400   18.2800 -108.8000      12.5        67       130        60
OIR    2025250     91400   18.2800 -108.8100      11.8        68       131        60
OIR    2025250     91400   18.2800 -108.8200      11.6        68       132        60
OIR    2025250     91400   18.2800 -108.8300      11.5        68       133        60
OIR    2025250     91400   18.2800 -108.8400      11.3        68       133        60
OIR    2025250     91400   18.2800 -108.8500      11.2        68       133        60
OIR    2025250     91400   18.2800 -108.8600      11.1        67       132        60
OIR    2025250     91400   18.2800 -108.8700      11.0        67       130        60
OIR    2025250     91400   18.2800 -108.8800      11.2        65       129        60
OIR    2025250     91400   18.2800 -108.8900      12.0        64       127        60
OIR    2025250     91400   18.2800 -108.9000      12.9        62       125        60
OIR    2025250     91400   18.2800 -108.9100      13.6        61       124        60
OIR    2025250     91400   18.2800 -108.9200      14.0        60       123        60
OIR    2025250     91400   18.2800 -108.9300      14.2        59       123        60
OIR    2025250     91400   18.2800 -108.9400      14.3        59       124        60
OIR    2025250     91400   18.2800 -108.9500      14.3        59       125        60
OIR    2025250     91400   18.2800 -108.9600      14.3        59       125        60
OIR    2025250     91400   18.2800 -108.9700      14.4        59       124        60
OIR    2025250     91400   18.2800 -108.9800      14.4        59       126        60
OIR    2025250     91400   18.2800 -108.9900      14.5        59       127        60
OIR    2025250     91400   18.2800 -109.0000      14.5        59       127        60
OIR    2025250     91400   18.2800 -109.0100      14.5        59       126        60
OIR    2025250     91400   18.2800 -109.0200      14.6        59       126        60
OIR    2025250     91400   18.2800 -109.0300      14.6        59       126        60
OIR    2025250     91400   18.2800 -109.0400      14.6        59       127        60
OIR    2025250     91400   18.2800 -109.0500      14.6        59       127        60
OIR    2025250     91400   18.2800 -109.0600      14.6        59       127        60
OIR    2025250     91400   18.2800 -109.0700      14.7        59       128        60
OIR    2025250     91400   18.2800 -109.0800      14.7        59       128        60
OIR    2025250     91400   18.2800 -109.0900      14.7        59       128        60
OIR    2025250     91400   18.2800 -109.1000      14.7        59       128        60
OIR    2025250     91400   18.2800 -109.1100      14.8        59       127        60
OIR    2025250     91400   18.2800 -109.1200      14.8        59       126        60
OIR    2025250     91400   18.2800 -109.1300      14.9        59       126        60
OIR    2025250     91400   18.2800 -109.1400      14.9        59       126        60
OIR    2025250     91400   18.2800 -109.1500      15.0        59       127        60
OIR    2025250     91400   18.2800 -109.1600      15.1        59       127        60
OIR    2025250     91400   18.2800 -109.1700      15.2        59       128        60
OIR    2025250     91400   18.2800 -109.1800      15.2        59       128        60
OIR    2025250     91400   18.2800 -109.1900      15.3        59       128        60
OIR    2025250     91400   18.2800 -109.2000      15.4        59       128        60
OIR    2025250     91400   18.2800 -109.2100      15.6        59       127        60
OIR    2025250     91400   18.2800 -109.2200      15.9        60       127        60
OIR    2025250     91400   18.2800 -109.2300      17.1        60       130        60
OIR    2025250     91400   18.2800 -109.2400      18.5        60       132        60
OIR    2025250     91400   18.2800 -109.2500      20.5        59       133        60
OIR    2025250     91400   18.2800 -109.2600      20.7        58       134        60
OIR    2025250     91400   18.2800 -109.2700      20.8        58       133        60
OIR    2025250     91400   18.2800 -109.2800      21.0        57       130        60
OIR    2025250     91400   18.2800 -109.2900      21.1        57       128        60
OIR    2025250     91400   18.2800 -109.3000      21.1        57       125        60
OIR    2025250     91400   18.2800 -109.3100      21.0        57       123        60
OIR    2025250     91400   18.2800 -109.3200      21.0        57       126        60
OIR    2025250     91400   18.2800 -109.3300      20.9        57       133        60
OIR    2025250     91400   18.2800 -109.3400      20.9        57       136        60
OIR    2025250     91400   18.2800 -109.3500      20.7        58       137        60
OIR    2025250     91400   18.2800 -109.3600      20.3        59       137        60
OIR    2025250     91400   18.2800 -110.9000      16.7        55       143        60
OIR    2025250     91400   18.2800 -110.9100      16.8        55       142        60
OIR    2025250     91400   18.2800 -110.9200      16.8        55       142        60
OIR    2025250     91400   18.2800 -111.2500      12.5        71       143        60
OIR    2025250     91400   18.2800 -111.2600      12.5        71       140        60
OIR    2025250     91400   18.2800 -111.2700      12.5        72       137        60
OIR    2025250     91400   18.2800 -111.2800      12.5        72       134        60
OIR    2025250     91400   18.2800 -111.2900      12.5        72       132        60
OIR    2025250     91400   18.2800 -111.3000      12.5        72       130        60
OIR    2025250     91400   18.2800 -111.3100      12.4        72       129        60
OIR    2025250     91400   18.2800 -111.3200      12.4        72       128        60
OIR    2025250     91400   18.2800 -111.3300      12.4        72       126        60
OIR    2025250     91400   18.2800 -111.3400      12.3        72       124        60
OIR    2025250     91400   18.2800 -111.3500      12.3        72       122        60
OIR    2025250     91400   18.2800 -111.3600      12.3        72       120        60
OIR    2025250     91400   18.2800 -111.3700      12.3        73       116        60
OIR    2025250     91400   18.2800 -111.3800      12.3        73       116        60
OIR    2025250     91400   18.2800 -111.3900      12.3        73       115        60
OIR    2025250     91400   18.2800 -111.4000      12.3        74       114        60
OIR    2025250     91400   18.2800 -111.4100      12.3        74       114        60
OIR    2025250     91400   18.2800 -111.4200      12.3        74       114        60
OIR    2025250     91400   18.2800 -111.4300      12.3        74       114        60
OIR    2025250     91400   18.2800 -111.4400      12.3        74       114        60
OIR    2025250     91400   18.2800 -111.4500      12.3        74       113        60
OIR    2025250     91400   18.2800 -111.4600      12.3        74       112        60
OIR    2025250     91400   18.2800 -111.4700      12.3        74       112        60
OIR    2025250     91400   18.2800 -111.4800      12.3        74       111        60
OIR    2025250     91400   18.2800 -111.4900      12.3        74       111        60
OIR    2025250     91400   18.2800 -111.5000      12.2        74       111        60
OIR    2025250     91400   18.2800 -111.5100      12.2        74       110        60
OIR    2025250     91400   18.2800 -111.5200      12.2        74       110        60
OIR    2025250     91400   18.2800 -111.5300      12.1        74       111        60
OIR    2025250     91400   18.2800 -111.5400      12.1        74       110        60
OIR    2025250     91400   18.2800 -111.5500      12.0        74       108        60
OIR    2025250     91400   18.2800 -111.5600      11.9        74       105        60
OIR    2025250     91400   18.2800 -111.5700      11.7        74       105        60
OIR    2025250     91400   18.2800 -111.5800      11.3        74       104        60
OIR    2025250     91400   18.2800 -111.5900      10.5        74       104        60
OIR    2025250     91400   18.2800 -111.6000       9.4        74       105        60
OIR    2025250     91400   18.2800 -111.6100       8.9        75       105        60
OIR    2025250     91400   18.2800 -111.6200       8.7        76       104        60
OIR    2025250     91400   18.2800 -111.6300       8.7        76       104        60
OIR    2025250     91400   18.2800 -111.6400       8.6        76       104        60
OIR    2025250     91400   18.2800 -111.6500       8.6        76       104        60
OIR    2025250     91400   18.2800 -111.6600       8.2        77       104        60
OIR    2025250     91400   18.2800 -111.6700       7.6        78       104        60
OIR    2025250     91400   18.2800 -111.6800       6.8        82       104        60
OIR    2025250     91400   18.2800 -111.6900       5.6        89       105        60
OIR    2025250     91400   18.2800 -111.7000       4.4       104       108        60
OIR    2025250     91400   18.2800 -111.7100       4.2       116       108        60
OIR    2025250     91400   18.2800 -111.7200       4.2       135       108        60
OIR    2025250     91400   18.2800 -111.7300       4.3       140       108        60
OIR    2025250     91400   18.2800 -111.7400       4.2       142       109        60
OIR    2025250     91400   18.2800 -111.7500       4.2       142       109        60
OIR    2025250     91400   18.2800 -111.7600       4.2       146       109        60
OIR    2025250     91400   18.2800 -111.7700       4.2       146       108        60
OIR    2025250     91400   18.2800 -111.7800       4.7       134       111        60
OIR    2025250     91400   18.2800 -111.7900       6.8       106       113        60
OIR    2025250     91400   18.2800 -111.8000       8.6        93       116        60
OIR    2025250     91400   18.2800 -111.8100       9.1        87       123        60
OIR    2025250     91400   18.2800 -111.8200      10.3        77       130        60
OIR    2025250     91400   18.2800 -111.8300       9.2        72       139        60
OIR    2025250     91400   18.2800 -112.1800      12.2        89       140        60
OIR    2025250     91400   18.2800 -112.1900      12.2        89       135        60
OIR    2025250     91400   18.2800 -112.2000      12.2        89       135        60
OIR    2025250     91400   18.2800 -112.2100      12.2        89       135        60
OIR    2025250     91400   18.2800 -112.2200      12.2        89       136        60
OIR    2025250     91400   18.2800 -112.2300      12.2        89       139        60
OIR    2025250     91400   18.2800 -112.2400      12.2        89       141        60
OIR    2025250     91400   18.2800 -112.2500      12.2        89       137        60
OIR    2025250     91400   18.2800 -112.2600      12.2        89       134        60
OIR    2025250     91400   18.2800 -112.2700      12.2        89       137        60
OIR    2025250     91400   18.2800 -112.2800      12.1        89       140        60
OIR    2025250     91400   18.2800 -112.2900      12.1        89       139        60
OIR    2025250     91400   18.2800 -112.3000      12.1        88       135        60
OIR    2025250     91400   18.2800 -112.3100      12.0        88       132        60
OIR    2025250     91400   18.2800 -112.3200      12.0        88       132        60
OIR    2025250     91400   18.2800 -112.3300      12.0        88       133        60
OIR    2025250     91400   18.2800 -112.3400      11.9        89       133        60
OIR    2025250     91400   18.2800 -112.3500      11.8        89       134        60
OIR    2025250     91400   18.2800 -112.3600      11.6        89       136        60
OIR    2025250     91400   18.2800 -112.3700      10.9        91       139        60
OIR    2025250     91400   18.2800 -112.3800       9.7        95       141        60
OIR    2025250     91400   18.2800 -112.4200       6.0       115       139        60
OIR    2025250     91400   18.2800 -112.4300       5.9       116       137        60
OIR    2025250     91400   18.2800 -112.4400       5.8       116       136        60
OIR    2025250     91400   18.2800 -112.4500       5.7       116       136        60
OIR    2025250     91400   18.2800 -112.4600       5.6       115       137        60
OIR    2025250     91400   18.2800 -112.4700       5.5       115       138        60
OIR    2025250     91400   18.2800 -112.4800       5.4       115       138        60
OIR    2025250     91400   18.2800 -112.4900       5.4       115       138        60
OIR    2025250     91400   18.2800 -112.5000       5.4       115       137        60
OIR    2025250     91400   18.2800 -112.5100       5.3       115       135        60
OIR    2025250     91400   18.2800 -112.5200       5.3       116       134        60
OIR    2025250     91400   18.2800 -112.5300       5.3       116       134        60
OIR    2025250     91400   18.2800 -112.5400       5.3       115       135        60
OIR    2025250     91400   18.2800 -112.5500       5.2       115       134        60
OIR    2025250     91400   18.2800 -112.5600       5.2       115       134        60
OIR    2025250     91400   18.2800 -112.5700       5.1       115       133        60
OIR    2025250     91400   18.2800 -112.5800       5.1       115       132        60
OIR    2025250     91400   18.2800 -112.5900       5.1       115       131        60
OIR    2025250     91400   18.2800 -112.6000       5.0       115       133        60
OIR    2025250     91400   18.2800 -112.6100       5.0       116       135        60
OIR    2025250     91400   18.2800 -112.6200       5.0       116       134        60
OIR    2025250     91400   18.2800 -112.6300       5.0       116       133        60
OIR    2025250     91400   18.2800 -112.6400       5.0       116       133        60
OIR    2025250     91400   18.2800 -112.6500       5.0       117       133        60
OIR    2025250     91400   18.2800 -112.6600       5.0       118       133        60
OIR    2025250     91400   18.2800 -112.6700       5.1       120       135        60
OIR    2025250     91400   18.2800 -112.6800       5.2       123       138        60
OIR    2025250     91400   18.2800 -112.6900       5.2       125       136        60
OIR    2025250     91400   18.2800 -112.7000       5.2       125       133        60
OIR    2025250     91400   18.2800 -112.7100       5.2       126       133        60
OIR    2025250     91400   18.2800 -112.7200       5.2       126       133        60
OIR    2025250     91400   18.2800 -112.7300       5.2       126       133        60
OIR    2025250     91400   18.2800 -112.7400       5.2       126       132        60
OIR    2025250     91400   18.2800 -112.7500       5.3       126       132        60
OIR    2025250     91400   18.2800 -112.7600       5.3       126       131        60
OIR    2025250     91400   18.2800 -112.7700       5.4       126       131        60
OIR    2025250     91400   18.2800 -112.7800       5.4       126       129        60
OIR    2025250     91400   18.2800 -112.7900       5.6       125       126        60
OIR    2025250     91400   18.2800 -112.8000       6.1       125       123        60
OIR    2025250     91400   18.2800 -112.8100       6.4       125       121        60
OIR    2025250     91400   18.2800 -112.8200       6.5       125       121        60
OIR    2025250     91400   18.2800 -112.8300       6.7       124       125        60
OIR    2025250     91400   18.2800 -112.8400       7.0       123       129        60
OIR    2025250     91400   18.2800 -112.8500       7.2       122       130        60
OIR    2025250     91400   18.2800 -112.8600       7.2       122       131        60
OIR    2025250     91400   18.2800 -112.8700       7.2       122       132        60
OIR    2025250     91400   18.2800 -112.8800       7.2       121       133        60
OIR    2025250     91400   18.2800 -112.8900       7.2       121       133        60
OIR    2025250     91400   18.2800 -112.9000       7.2       121       132        60
OIR    2025250     91400   18.2800 -112.9100       7.2       121       132        60
OIR    2025250     91400   18.2800 -112.9200       7.2       121       130        60
OIR    2025250     91400   18.2800 -112.9300       7.2       121       128        60
OIR    2025250     91400   18.2800 -112.9400       7.2       121       126        60
OIR    2025250     91400   18.2800 -112.9500       7.3       120       125        60
OIR    2025250     91400   18.2800 -112.9600       7.3       120       124        60
OIR    2025250     91400   18.2800 -112.9700       7.5       119       124        60
OIR    2025250     91400   18.2800 -112.9800       7.6       118       123        60
OIR    2025250     91400   18.2800 -112.9900       7.7       117       122        60
OIR    2025250     91400   18.2800 -113.0000       7.7       116       121        60
OIR    2025250     91400   18.2800 -113.0100       7.7       115       122        60
OIR    2025250     91400   18.2800 -113.0200       7.6       114       124        60
OIR    2025250     91400   18.2800 -113.0300       7.6       114       128        60
OIR    2025250     91400   18.2800 -113.0400       7.6       114       133        60
OIR    2025250     91400   18.2800 -113.0500       7.6       114       138        60
OIR    2025250     91400   18.2800 -113.0600       7.6       114       139        60
OIR    2025250     91400   18.2800 -113.0700       7.5       114       139        60
OIR    2025250     91400   18.2800 -113.0800       7.5       114       141        60
OIR    2025250     91400   18.2800 -113.0900       7.5       113       142        60
OIR    2025250     91400   18.2800 -113.1000       7.5       113       140        60
OIR    2025250     91400   18.2800 -113.1100       7.5       111       135        60
OIR    2025250     91400   18.2800 -113.1200       7.5       109       131        60
OIR    2025250     91400   18.2800 -113.1300       7.5       108       128        60
OIR    2025250     91400   18.2800 -113.1400       7.4       108       125        60
OIR    2025250     91400   18.2800 -113.1500       7.3       107       125        60
OIR    2025250     91400   18.2800 -113.1600       7.0       106       125        60
OIR    2025250     91400   18.2800 -113.1700       6.0       101       126        60
OIR    2025250     91400   18.2800 -113.1800       4.7        92       127        60
OIR    2025250     91400   18.2800 -113.1900       4.1        86       128        60
OIR    2025250     91400   18.2800 -113.2000       4.0        84       129        60
OIR    2025250     91400   18.2800 -113.3400       4.2        94       141        60
OIR    2025250     91400   18.2800 -113.7900       4.2       182       140        60
OIR    2025250     91400   18.2800 -113.8000       4.5       178       139        60
OIR    2025250     91400   18.2800 -113.8100       4.6       176       138        60
OIR    2025250     91400   18.2800 -113.8200       4.7       175       137        60
OIR    2025250     91400   18.2800 -113.8300       4.7       173       135        60
OIR    2025250     91400   18.2800 -113.8400       4.7       170       134        60
OIR    2025250     91400   18.2800 -113.8500       4.6       165       133        60
OIR    2025250     91400   18.2800 -113.8600       4.6       162       132        60
OIR    2025250     91400   18.2800 -113.8700       4.5       159       130        60
OIR    2025250     91400   18.2800 -113.8800       4.4       158       132        60
OIR    2025250     91400   18.2800 -113.8900       4.3       157       133        60
OIR    2025250     91400   18.2800 -113.9000       4.2       157       136        60
OIR    2025250     91400   18.2800 -113.9100       4.2       157       140        60
OIR    2025250     91400   18.2800 -113.9300       4.1       156       141        60
OIR    2025250     91400   18.2800 -114.2700       4.0       258       128        60
OIR    2025250     91400   18.2800 -114.2800       4.3       258       130        60
OIR    2025250     91400   18.2800 -114.2900       4.9       258       134        60
OIR    2025250     91400   18.2800 -114.3000       5.1       258       139        60
OIR    2025250     91400   18.2800 -118.1800      21.7        28       144        60
OIR    2025250     91400   18.2700 -108.6400      13.4        54       141        60
OIR    2025250     91400   18.2700 -108.6500      13.2        54       138        60
OIR    2025250     91400   18.2700 -108.6600      13.2        55       140        60
OIR    2025250     91400   18.2700 -108.7400      13.6        57       142        60
OIR    2025250     91400   18.2700 -108.7500      13.6        58       139        60
OIR    2025250     91400   18.2700 -108.7600      13.6        60       137        60
OIR    2025250     91400   18.2700 -108.7700      13.5        61       136        60
OIR    2025250     91400   18.2700 -108.7800      13.2        64       134        60
OIR    2025250     91400   18.2700 -108.7900      12.8        67       133        60
OIR    2025250     91400   18.2700 -108.8000      12.3        68       131        60
OIR    2025250     91400   18.2700 -108.8100      11.6        69       132        60
OIR    2025250     91400   18.2700 -108.8200      11.4        69       134        60
OIR    2025250     91400   18.2700 -108.8300      11.3        68       135        60
OIR    2025250     91400   18.2700 -108.8400      11.2        68       136        60
OIR    2025250     91400   18.2700 -108.8500      11.1        68       137        60
OIR    2025250     91400   18.2700 -108.8600      10.9        67       136        60
OIR    2025250     91400   18.2700 -108.8700      10.9        67       135        60
OIR    2025250     91400   18.2700 -108.8800      10.8        67       133        60
OIR    2025250     91400   18.2700 -108.8900      11.0        67       130        60
OIR    2025250     91400   18.2700 -108.9000      11.3        66       127        60
OIR    2025250     91400   18.2700 -108.9100      12.0        64       126        60
OIR    2025250     91400   18.2700 -108.9200      12.7        62       125        60
OIR    2025250     91400   18.2700 -108.9300      13.5        61       125        60
OIR    2025250     91400   18.2700 -108.9400      13.9        60       125        60
OIR    2025250     91400   18.2700 -108.9500      13.9        60       125        60
OIR    2025250     91400   18.2700 -108.9600      14.0        60       125        60
OIR    2025250     91400   18.2700 -108.9700      14.2        60       124        60
OIR    2025250     91400   18.2700 -108.9800      14.3        60       125        60
OIR    2025250     91400   18.2700 -108.9900      14.4        59       126        60
OIR    2025250     91400   18.2700 -109.0000      14.5        59       127        60
OIR    2025250     91400   18.2700 -109.0100      14.5        59       127        60
OIR    2025250     91400   18.2700 -109.0200      14.5        59       126        60
OIR    2025250     91400   18.2700 -109.0300      14.6        59       127        60
OIR    2025250     91400   18.2700 -109.0400      14.6        59       127        60
OIR    2025250     91400   18.2700 -109.0500      14.6        59       128        60
OIR    2025250     91400   18.2700 -109.0600      14.6        59       128        60
OIR    2025250     91400   18.2700 -109.0700      14.6        59       128        60
OIR    2025250     91400   18.2700 -109.0800      14.7        59       128        60
OIR    2025250     91400   18.2700 -109.0900      14.7        59       128        60
OIR    2025250     91400   18.2700 -109.1000      14.7        59       128        60
OIR    2025250     91400   18.2700 -109.1100      14.7        59       127        60
OIR    2025250     91400   18.2700 -109.1200      14.8        59       126        60
OIR    2025250     91400   18.2700 -109.1300      14.8        59       127        60
OIR    2025250     91400   18.2700 -109.1400      14.9        59       128        60
OIR    2025250     91400   18.2700 -109.1500      15.0        59       128        60
OIR    2025250     91400   18.2700 -109.1600      15.0        59       129        60
OIR    2025250     91400   18.2700 -109.1700      15.1        59       129        60
OIR    2025250     91400   18.2700 -109.1800      15.2        59       129        60
OIR    2025250     91400   18.2700 -109.1900      15.3        59       128        60
OIR    2025250     91400   18.2700 -109.2000      15.3        60       128        60
OIR    2025250     91400   18.2700 -109.2100      15.5        60       127        60
OIR    2025250     91400   18.2700 -109.2200      15.8        60       127        60
OIR    2025250     91400   18.2700 -109.2300      17.1        61       130        60
OIR    2025250     91400   18.2700 -109.2400      18.7        60       133        60
OIR    2025250     91400   18.2700 -109.2500      20.5        59       135        60
OIR    2025250     91400   18.2700 -109.2600      20.7        58       137        60
OIR    2025250     91400   18.2700 -109.2700      20.9        58       138        60
OIR    2025250     91400   18.2700 -109.2800      21.1        57       135        60
OIR    2025250     91400   18.2700 -109.2900      21.1        57       133        60
OIR    2025250     91400   18.2700 -109.3000      21.2        57       131        60
OIR    2025250     91400   18.2700 -109.3100      21.2        57       130        60
OIR    2025250     91400   18.2700 -109.3200      21.0        57       132        60
OIR    2025250     91400   18.2700 -110.9000      16.8        56       143        60
OIR    2025250     91400   18.2700 -110.9100      16.8        56       142        60
OIR    2025250     91400   18.2700 -110.9200      16.8        56       142        60
OIR    2025250     91400   18.2700 -111.2500      12.4        71       142        60
OIR    2025250     91400   18.2700 -111.2600      12.5        72       139        60
OIR    2025250     91400   18.2700 -111.2700      12.5        72       136        60
OIR    2025250     91400   18.2700 -111.2800      12.5        72       132        60
OIR    2025250     91400   18.2700 -111.2900      12.4        72       130        60
OIR    2025250     91400   18.2700 -111.3000      12.4        72       127        60
OIR    2025250     91400   18.2700 -111.3100      12.4        72       126        60
OIR    2025250     91400   18.2700 -111.3200      12.4        72       125        60
OIR    2025250     91400   18.2700 -111.3300      12.3        72       123        60
OIR    2025250     91400   18.2700 -111.3400      12.2        73       121        60
OIR    2025250     91400   18.2700 -111.3500      12.2        73       119        60
OIR    2025250     91400   18.2700 -111.3600      12.2        74       117        60
OIR    2025250     91400   18.2700 -111.3700      12.2        74       116        60
OIR    2025250     91400   18.2700 -111.3800      12.1        74       115        60
OIR    2025250     91400   18.2700 -111.3900      12.1        75       114        60
OIR    2025250     91400   18.2700 -111.4000      12.1        75       113        60
OIR    2025250     91400   18.2700 -111.4100      12.1        75       113        60
OIR    2025250     91400   18.2700 -111.4200      12.2        75       113        60
OIR    2025250     91400   18.2700 -111.4300      12.2        75       113        60
OIR    2025250     91400   18.2700 -111.4400      12.2        75       113        60
OIR    2025250     91400   18.2700 -111.4500      12.2        75       112        60
OIR    2025250     91400   18.2700 -111.4600      12.2        75       111        60
OIR    2025250     91400   18.2700 -111.4700      12.2        75       109        60
OIR    2025250     91400   18.2700 -111.4800      12.2        75       109        60
OIR    2025250     91400   18.2700 -111.4900      12.1        75       109        60
OIR    2025250     91400   18.2700 -111.5000      12.1        75       108        60
OIR    2025250     91400   18.2700 -111.5100      12.1        75       107        60
OIR    2025250     91400   18.2700 -111.5200      12.0        75       107        60
OIR    2025250     91400   18.2700 -111.5300      12.0        75       107        60
OIR    2025250     91400   18.2700 -111.5400      11.9        75       108        60
OIR    2025250     91400   18.2700 -111.5500      11.8        75       105        60
OIR    2025250     91400   18.2700 -111.5600      11.7        75       104        60
OIR    2025250     91400   18.2700 -111.5700      11.5        75       104        60
OIR    2025250     91400   18.2700 -111.5800      11.1        75       104        60
OIR    2025250     91400   18.2700 -111.5900      10.1        75       104        60
OIR    2025250     91400   18.2700 -111.6000       9.2        75       104        60
OIR    2025250     91400   18.2700 -111.6100       8.8        76       104        60
OIR    2025250     91400   18.2700 -111.6200       8.7        76       104        60
OIR    2025250     91400   18.2700 -111.6300       8.7        76       104        60
OIR    2025250     91400   18.2700 -111.6400       8.6        76       104        60
OIR    2025250     91400   18.2700 -111.6500       8.6        76       104        60
OIR    2025250     91400   18.2700 -111.6600       8.1        77       103        60
OIR    2025250     91400   18.2700 -111.6700       7.4        79       103        60
OIR    2025250     91400   18.2700 -111.6800       6.5        83       103        60
OIR    2025250     91400   18.2700 -111.6900       5.4        90       105        60
OIR    2025250     91400   18.2700 -111.7000       4.4       103       108        60
OIR    2025250     91400   18.2700 -111.7100       4.0       117       108        60
OIR    2025250     91400   18.2700 -111.7200       4.1       135       108        60
OIR    2025250     91400   18.2700 -111.7300       4.2       141       108        60
OIR    2025250     91400   18.2700 -111.7400       4.2       142       108        60
OIR    2025250     91400   18.2700 -111.7500       4.2       142       108        60
OIR    2025250     91400   18.2700 -111.7600       4.2       143       107        60
OIR    2025250     91400   18.2700 -111.7700       4.4       142       107        60
OIR    2025250     91400   18.2700 -111.7800       6.5       127       107        60
OIR    2025250     91400   18.2700 -111.7900       9.3       108       107        60
OIR    2025250     91400   18.2700 -111.8000      10.4        95       110        60
OIR    2025250     91400   18.2700 -111.8100      12.0        80       114        60
OIR    2025250     91400   18.2700 -111.8200      12.9        74       119        60
OIR    2025250     91400   18.2700 -111.8300      11.9        66       130        60
OIR    2025250     91400   18.2700 -112.1600      12.2        89       142        60
OIR    2025250     91400   18.2700 -112.1700      12.2        89       140        60
OIR    2025250     91400   18.2700 -112.1800      12.2        89       138        60
OIR    2025250     91400   18.2700 -112.1900      12.2        89       136        60
OIR    2025250     91400   18.2700 -112.2000      12.2        89       135        60
OIR    2025250     91400   18.2700 -112.2100      12.2        89       134        60
OIR    2025250     91400   18.2700 -112.2200      12.2        89       134        60
OIR    2025250     91400   18.2700 -112.2300      12.2        89       136        60
OIR    2025250     91400   18.2700 -112.2400      12.2        89       138        60
OIR    2025250     91400   18.2700 -112.2500      12.2        89       137        60
OIR    2025250     91400   18.2700 -112.2600      12.2        89       135        60
OIR    2025250     91400   18.2700 -112.2700      12.2        89       135        60
OIR    2025250     91400   18.2700 -112.2800      12.2        89       137        60
OIR    2025250     91400   18.2700 -112.2900      12.2        89       137        60
OIR    2025250     91400   18.2700 -112.3000      12.1        89       133        60
OIR    2025250     91400   18.2700 -112.3100      12.1        89       129        60
OIR    2025250     91400   18.2700 -112.3200      12.0        89       129        60
OIR    2025250     91400   18.2700 -112.3300      12.0        89       129        60
OIR    2025250     91400   18.2700 -112.3400      12.0        89       131        60
OIR    2025250     91400   18.2700 -112.3500      11.9        89       134        60
OIR    2025250     91400   18.2700 -112.3600      11.8        90       136        60
OIR    2025250     91400   18.2700 -112.3700      11.5        91       137        60
OIR    2025250     91400   18.2700 -112.3800      10.6        93       138        60
OIR    2025250     91400   18.2700 -112.3900       9.4        98       140        60
OIR    2025250     91400   18.2700 -112.4100       6.4       113       142        60
OIR    2025250     91400   18.2700 -112.4200       6.1       115       137        60
OIR    2025250     91400   18.2700 -112.4300       6.0       115       134        60
OIR    2025250     91400   18.2700 -112.4400       5.9       116       133        60
OIR    2025250     91400   18.2700 -112.4500       5.9       116       133        60
OIR    2025250     91400   18.2700 -112.4600       5.7       115       134        60
OIR    2025250     91400   18.2700 -112.4700       5.6       116       136        60
OIR    2025250     91400   18.2700 -112.4800       5.5       116       138        60
OIR    2025250     91400   18.2700 -112.4900       5.4       116       140        60
OIR    2025250     91400   18.2700 -112.5000       5.4       116       141        60
OIR    2025250     91400   18.2700 -112.5100       5.3       116       139        60
OIR    2025250     91400   18.2700 -112.5200       5.3       116       137        60
OIR    2025250     91400   18.2700 -112.5300       5.3       116       135        60
OIR    2025250     91400   18.2700 -112.5400       5.3       116       134        60
OIR    2025250     91400   18.2700 -112.5500       5.2       116       133        60
OIR    2025250     91400   18.2700 -112.5600       5.2       116       132        60
OIR    2025250     91400   18.2700 -112.5700       5.1       116       132        60
OIR    2025250     91400   18.2700 -112.5800       5.1       116       131        60
OIR    2025250     91400   18.2700 -112.5900       5.1       116       131        60
OIR    2025250     91400   18.2700 -112.6000       5.0       116       134        60
OIR    2025250     91400   18.2700 -112.6100       5.0       116       136        60
OIR    2025250     91400   18.2700 -112.6200       5.0       116       135        60
OIR    2025250     91400   18.2700 -112.6300       5.0       116       132        60
OIR    2025250     91400   18.2700 -112.6400       5.0       116       130        60
OIR    2025250     91400   18.2700 -112.6500       5.0       117       130        60
OIR    2025250     91400   18.2700 -112.6600       5.1       118       130        60
OIR    2025250     91400   18.2700 -112.6700       5.1       122       134        60
OIR    2025250     91400   18.2700 -112.6800       5.2       124       137        60
OIR    2025250     91400   18.2700 -112.6900       5.2       125       136        60
OIR    2025250     91400   18.2700 -112.7000       5.2       126       134        60
OIR    2025250     91400   18.2700 -112.7100       5.2       126       133        60
OIR    2025250     91400   18.2700 -112.7200       5.2       126       134        60
OIR    2025250     91400   18.2700 -112.7300       5.2       126       134        60
OIR    2025250     91400   18.2700 -112.7400       5.2       126       134        60
OIR    2025250     91400   18.2700 -112.7500       5.3       126       133        60
OIR    2025250     91400   18.2700 -112.7600       5.4       126       133        60
OIR    2025250     91400   18.2700 -112.7700       5.4       126       133        60
OIR    2025250     91400   18.2700 -112.7800       5.5       126       131        60
OIR    2025250     91400   18.2700 -112.7900       5.9       125       127        60
OIR    2025250     91400   18.2700 -112.8000       6.4       125       124        60
OIR    2025250     91400   18.2700 -112.8100       6.5       125       123        60
OIR    2025250     91400   18.2700 -112.8200       6.6       125       122        60
OIR    2025250     91400   18.2700 -112.8300       6.7       124       126        60
OIR    2025250     91400   18.2700 -112.8400       6.9       124       131        60
OIR    2025250     91400   18.2700 -112.8500       7.1       123       131        60
OIR    2025250     91400   18.2700 -112.8600       7.1       122       131        60
OIR    2025250     91400   18.2700 -112.8700       7.1       122       132        60
OIR    2025250     91400   18.2700 -112.8800       7.1       121       133        60
OIR    2025250     91400   18.2700 -112.8900       7.2       121       134        60
OIR    2025250     91400   18.2700 -112.9000       7.2       121       133        60
OIR    2025250     91400   18.2700 -112.9100       7.2       121       131        60
OIR    2025250     91400   18.2700 -112.9200       7.2       121       130        60
OIR    2025250     91400   18.2700 -112.9300       7.2       121       129        60
OIR    2025250     91400   18.2700 -112.9400       7.2       120       127        60
OIR    2025250     91400   18.2700 -112.9500       7.3       120       126        60
OIR    2025250     91400   18.2700 -112.9600       7.4       120       124        60
OIR    2025250     91400   18.2700 -112.9700       7.5       119       124        60
OIR    2025250     91400   18.2700 -112.9800       7.6       118       123        60
OIR    2025250     91400   18.2700 -112.9900       7.7       117       122        60
OIR    2025250     91400   18.2700 -113.0000       7.7       116       121        60
OIR    2025250     91400   18.2700 -113.0100       7.7       115       122        60
OIR    2025250     91400   18.2700 -113.0200       7.6       114       124        60
OIR    2025250     91400   18.2700 -113.0300       7.6       114       128        60
OIR    2025250     91400   18.2700 -113.0400       7.6       114       134        60
OIR    2025250     91400   18.2700 -113.0500       7.6       114       139        60
OIR    2025250     91400   18.2700 -113.0600       7.5       114       141        60
OIR    2025250     91400   18.2700 -113.0700       7.5       114       142        60
OIR    2025250     91400   18.2700 -113.0800       7.5       114       143        60
OIR    2025250     91400   18.2700 -113.0900       7.5       113       143        60
OIR    2025250     91400   18.2700 -113.1000       7.5       112       141        60
OIR    2025250     91400   18.2700 -113.1100       7.5       110       134        60
OIR    2025250     91400   18.2700 -113.1200       7.5       109       128        60
OIR    2025250     91400   18.2700 -113.1300       7.5       108       125        60
OIR    2025250     91400   18.2700 -113.1400       7.4       108       123        60
OIR    2025250     91400   18.2700 -113.1500       7.4       107       122        60
OIR    2025250     91400   18.2700 -113.1600       7.0       106       121        60
OIR    2025250     91400   18.2700 -113.1700       5.8        99       123        60
OIR    2025250     91400   18.2700 -113.1800       4.5        88       127        60
OIR    2025250     91400   18.2700 -113.1900       4.1        83       129        60
OIR    2025250     91400   18.2700 -113.2000       4.0        81       130        60
OIR    2025250     91400   18.2700 -113.3300       4.0        95       141        60
OIR    2025250     91400   18.2700 -113.3400       4.5        95       142        60
OIR    2025250     91400   18.2700 -113.3500       5.6        95       143        60
OIR    2025250     91400   18.2700 -113.7900       4.3       183       142        60
OIR    2025250     91400   18.2700 -113.8000       4.5       179       138        60
OIR    2025250     91400   18.2700 -113.8100       4.6       177       134        60
OIR    2025250     91400   18.2700 -113.8200       4.6       176       131        60
OIR    2025250     91400   18.2700 -113.8300       4.6       174       129        60
OIR    2025250     91400   18.2700 -113.8400       4.6       171       128        60
OIR    2025250     91400   18.2700 -113.8500       4.5       167       128        60
OIR    2025250     91400   18.2700 -113.8600       4.5       164       128        60
OIR    2025250     91400   18.2700 -113.8700       4.4       162       129        60
OIR    2025250     91400   18.2700 -113.8800       4.3       161       132        60
OIR    2025250     91400   18.2700 -113.8900       4.2       159       135        60
OIR    2025250     91400   18.2700 -113.9000       4.2       158       139        60
OIR    2025250     91400   18.2700 -113.9100       4.2       158       142        60
OIR    2025250     91400   18.2700 -114.2800       4.2       259       130        60
OIR    2025250     91400   18.2700 -114.2900       4.6       259       133        60
OIR    2025250     91400   18.2700 -114.3000       4.9       259       136        60
OIR    2025250     91400   18.2700 -114.3100       5.1       258       141        60
OIR    2025250     91400   18.2700 -118.1700      19.2        33       139        60
OIR    2025250     91400   18.2700 -118.1800      20.6        30       136        60
OIR    2025250     91400   18.2700 -118.1900      21.2        29       134        60
OIR    2025250     91400   18.2700 -118.2000      22.0        29       139        60
OIR    2025250     91400   18.2600 -108.7500      13.4        58       142        60
OIR    2025250     91400   18.2600 -108.7600      13.3        60       140        60
OIR    2025250     91400   18.2600 -108.7700      13.2        63       138        60
OIR    2025250     91400   18.2600 -108.7800      12.8        66       136        60
OIR    2025250     91400   18.2600 -108.7900      12.4        68       135        60
OIR    2025250     91400   18.2600 -108.8000      11.9        69       134        60
OIR    2025250     91400   18.2600 -108.8100      11.3        69       134        60
OIR    2025250     91400   18.2600 -108.8200      11.1        69       136        60
OIR    2025250     91400   18.2600 -108.8300      11.1        68       137        60
OIR    2025250     91400   18.2600 -108.8400      11.0        68       139        60
OIR    2025250     91400   18.2600 -108.8500      10.9        67       141        60
OIR    2025250     91400   18.2600 -108.8600      10.8        67       140        60
OIR    2025250     91400   18.2600 -108.8700      10.8        67       139        60
OIR    2025250     91400   18.2600 -108.8800      10.8        67       137        60
OIR    2025250     91400   18.2600 -108.8900      10.8        67       134        60
OIR    2025250     91400   18.2600 -108.9000      10.8        67       130        60
OIR    2025250     91400   18.2600 -108.9100      11.0        67       129        60
OIR    2025250     91400   18.2600 -108.9200      11.3        66       128        60
OIR    2025250     91400   18.2600 -108.9300      11.9        65       126        60
OIR    2025250     91400   18.2600 -108.9400      12.7        63       126        60
OIR    2025250     91400   18.2600 -108.9500      13.1        63       125        60
OIR    2025250     91400   18.2600 -108.9600      13.3        62       125        60
OIR    2025250     91400   18.2600 -108.9700      13.6        61       124        60
OIR    2025250     91400   18.2600 -108.9800      13.9        61       124        60
OIR    2025250     91400   18.2600 -108.9900      14.2        60       126        60
OIR    2025250     91400   18.2600 -109.0000      14.3        59       127        60
OIR    2025250     91400   18.2600 -109.0100      14.5        59       127        60
OIR    2025250     91400   18.2600 -109.0200      14.5        59       126        60
OIR    2025250     91400   18.2600 -109.0300      14.6        59       127        60
OIR    2025250     91400   18.2600 -109.0400      14.6        59       128        60
OIR    2025250     91400   18.2600 -109.0500      14.6        59       129        60
OIR    2025250     91400   18.2600 -109.0600      14.6        59       129        60
OIR    2025250     91400   18.2600 -109.0700      14.6        59       129        60
OIR    2025250     91400   18.2600 -109.0800      14.6        59       129        60
OIR    2025250     91400   18.2600 -109.0900      14.7        59       128        60
OIR    2025250     91400   18.2600 -109.1000      14.7        59       128        60
OIR    2025250     91400   18.2600 -109.1100      14.7        59       127        60
OIR    2025250     91400   18.2600 -109.1200      14.7        59       126        60
OIR    2025250     91400   18.2600 -109.1300      14.8        59       127        60
OIR    2025250     91400   18.2600 -109.1400      14.8        59       128        60
OIR    2025250     91400   18.2600 -109.1500      14.9        59       129        60
OIR    2025250     91400   18.2600 -109.1600      15.0        59       130        60
OIR    2025250     91400   18.2600 -109.1700      15.1        60       131        60
OIR    2025250     91400   18.2600 -109.1800      15.1        60       130        60
OIR    2025250     91400   18.2600 -109.1900      15.2        60       130        60
OIR    2025250     91400   18.2600 -109.2000      15.3        60       129        60
OIR    2025250     91400   18.2600 -109.2100      15.4        60       129        60
OIR    2025250     91400   18.2600 -109.2200      15.6        60       128        60
OIR    2025250     91400   18.2600 -109.2300      16.8        61       130        60
OIR    2025250     91400   18.2600 -109.2400      18.7        61       132        60
OIR    2025250     91400   18.2600 -109.2500      20.4        59       134        60
OIR    2025250     91400   18.2600 -109.2600      20.7        59       136        60
OIR    2025250     91400   18.2600 -109.2700      20.9        58       138        60
OIR    2025250     91400   18.2600 -109.2800      21.1        58       136        60
OIR    2025250     91400   18.2600 -109.2900      21.3        58       135        60
OIR    2025250     91400   18.2600 -109.3000      21.4        58       136        60
OIR    2025250     91400   18.2600 -109.3100      21.3        59       139        60
OIR    2025250     91400   18.2600 -110.8900      16.7        56       142        60
OIR    2025250     91400   18.2600 -110.9000      16.7        56       142        60
OIR    2025250     91400   18.2600 -110.9100      16.8        56       142        60
OIR    2025250     91400   18.2600 -111.2300      12.3        66       142        60
OIR    2025250     91400   18.2600 -111.2400      12.3        70       139        60
OIR    2025250     91400   18.2600 -111.2500      12.4        72       139        60
OIR    2025250     91400   18.2600 -111.2600      12.4        72       137        60
OIR    2025250     91400   18.2600 -111.2700      12.4        72       134        60
OIR    2025250     91400   18.2600 -111.2800      12.4        72       131        60
OIR    2025250     91400   18.2600 -111.2900      12.4        73       128        60
OIR    2025250     91400   18.2600 -111.3000      12.3        73       125        60
OIR    2025250     91400   18.2600 -111.3100      12.3        73       123        60
OIR    2025250     91400   18.2600 -111.3200      12.3        73       121        60
OIR    2025250     91400   18.2600 -111.3300      12.2        73       120        60
OIR    2025250     91400   18.2600 -111.3400      12.2        74       117        60
OIR    2025250     91400   18.2600 -111.3500      12.1        74       116        60
OIR    2025250     91400   18.2600 -111.3600      12.1        74       116        60
OIR    2025250     91400   18.2600 -111.3700      12.1        75       115        60
OIR    2025250     91400   18.2600 -111.3800      12.1        75       115        60
OIR    2025250     91400   18.2600 -111.3900      12.1        75       114        60
OIR    2025250     91400   18.2600 -111.4000      12.1        75       113        60
OIR    2025250     91400   18.2600 -111.4100      12.1        75       113        60
OIR    2025250     91400   18.2600 -111.4200      12.1        75       113        60
OIR    2025250     91400   18.2600 -111.4300      12.1        75       112        60
OIR    2025250     91400   18.2600 -111.4400      12.1        75       112        60
OIR    2025250     91400   18.2600 -111.4500      12.1        76       111        60
OIR    2025250     91400   18.2600 -111.4600      12.1        76       109        60
OIR    2025250     91400   18.2600 -111.4700      12.1        76       107        60
OIR    2025250     91400   18.2600 -111.4800      12.0        76       107        60
OIR    2025250     91400   18.2600 -111.4900      12.0        76       108        60
OIR    2025250     91400   18.2600 -111.5000      12.0        76       105        60
OIR    2025250     91400   18.2600 -111.5100      11.9        76       104        60
OIR    2025250     91400   18.2600 -111.5200      11.9        76       103        60
OIR    2025250     91400   18.2600 -111.5300      11.9        76       104        60
OIR    2025250     91400   18.2600 -111.5400      11.8        76       104        60
OIR    2025250     91400   18.2600 -111.5500      11.7        75       104        60
OIR    2025250     91400   18.2600 -111.5600      11.6        75       104        60
OIR    2025250     91400   18.2600 -111.5700      11.4        75       103        60
OIR    2025250     91400   18.2600 -111.5800      10.9        75       103        60
OIR    2025250     91400   18.2600 -111.5900       9.9        75       103        60
OIR    2025250     91400   18.2600 -111.6000       9.0        76       103        60
OIR    2025250     91400   18.2600 -111.6100       8.8        76       103        60
OIR    2025250     91400   18.2600 -111.6200       8.7        76       104        60
OIR    2025250     91400   18.2600 -111.6300       8.7        76       104        60
OIR    2025250     91400   18.2600 -111.6400       8.6        76       104        60
OIR    2025250     91400   18.2600 -111.6500       8.6        76       103        60
OIR    2025250     91400   18.2600 -111.6600       8.1        77       103        60
OIR    2025250     91400   18.2600 -111.6700       7.3        79       104        60
OIR    2025250     91400   18.2600 -111.6800       6.4        82       104        60
OIR    2025250     91400   18.2600 -111.6900       5.3        89       105        60
OIR    2025250     91400   18.2600 -111.7000       4.5        99       108        60
OIR    2025250     91400   18.2600 -111.7200       4.0       135       109        60
OIR    2025250     91400   18.2600 -111.7300       4.2       141       109        60
OIR    2025250     91400   18.2600 -111.7400       4.2       142       109        60
OIR    2025250     91400   18.2600 -111.7500       4.2       143       108        60
OIR    2025250     91400   18.2600 -111.7600       4.2       142       107        60
OIR    2025250     91400   18.2600 -111.7700       5.6       130       105        60
OIR    2025250     91400   18.2600 -111.7800       9.2       120       104        60
OIR    2025250     91400   18.2600 -111.7900      11.1       108       107        60
OIR    2025250     91400   18.2600 -111.8000      11.2        99       109        60
OIR    2025250     91400   18.2600 -111.8100      13.1        79       116        60
OIR    2025250     91400   18.2600 -111.8200      13.8        71       122        60
OIR    2025250     91400   18.2600 -111.8300      13.7        63       131        60
OIR    2025250     91400   18.2600 -111.8400      12.4        53       142        60
OIR    2025250     91400   18.2600 -112.1400      12.1        89       143        60
OIR    2025250     91400   18.2600 -112.1500      12.2        89       136        60
OIR    2025250     91400   18.2600 -112.1600      12.2        89       134        60
OIR    2025250     91400   18.2600 -112.1700      12.2        89       133        60
OIR    2025250     91400   18.2600 -112.1800      12.2        89       134        60
OIR    2025250     91400   18.2600 -112.1900      12.2        89       136        60
OIR    2025250     91400   18.2600 -112.2000      12.2        89       137        60
OIR    2025250     91400   18.2600 -112.2100      12.2        89       136        60
OIR    2025250     91400   18.2600 -112.2200      12.2        89       135        60
OIR    2025250     91400   18.2600 -112.2300      12.2        89       135        60
OIR    2025250     91400   18.2600 -112.2400      12.2        89       134        60
OIR    2025250     91400   18.2600 -112.2500      12.2        89       134        60
OIR    2025250     91400   18.2600 -112.2600      12.2        89       135        60
OIR    2025250     91400   18.2600 -112.2700      12.2        89       135        60
OIR    2025250     91400   18.2600 -112.2800      12.2        89       135        60
OIR    2025250     91400   18.2600 -112.2900      12.2        89       135        60
OIR    2025250     91400   18.2600 -112.3000      12.2        89       133        60
OIR    2025250     91400   18.2600 -112.3100      12.2        89       131        60
OIR    2025250     91400   18.2600 -112.3200      12.2        90       130        60
OIR    2025250     91400   18.2600 -112.3300      12.1        90       130        60
OIR    2025250     91400   18.2600 -112.3400      12.1        90       131        60
OIR    2025250     91400   18.2600 -112.3500      12.0        90       134        60
OIR    2025250     91400   18.2600 -112.3600      11.9        90       137        60
OIR    2025250     91400   18.2600 -112.3700      11.7        91       138        60
OIR    2025250     91400   18.2600 -112.3800      11.1        93       139        60
OIR    2025250     91400   18.2600 -112.3900       9.9        97       141        60
OIR    2025250     91400   18.2600 -112.4100       6.9       110       142        60
OIR    2025250     91400   18.2600 -112.4200       6.4       114       139        60
OIR    2025250     91400   18.2600 -112.4300       6.2       115       137        60
OIR    2025250     91400   18.2600 -112.4400       6.2       116       134        60
OIR    2025250     91400   18.2600 -112.4500       6.1       116       130        60
OIR    2025250     91400   18.2600 -112.4600       6.0       116       132        60
OIR    2025250     91400   18.2600 -112.4700       5.8       116       135        60
OIR    2025250     91400   18.2600 -112.4800       5.6       117       137        60
OIR    2025250     91400   18.2600 -112.4900       5.5       116       139        60
OIR    2025250     91400   18.2600 -112.5000       5.4       116       141        60
OIR    2025250     91400   18.2600 -112.5100       5.3       116       138        60
OIR    2025250     91400   18.2600 -112.5200       5.3       116       136        60
OIR    2025250     91400   18.2600 -112.5300       5.3       116       135        60
OIR    2025250     91400   18.2600 -112.5400       5.3       116       135        60
OIR    2025250     91400   18.2600 -112.5500       5.2       116       134        60
OIR    2025250     91400   18.2600 -112.5600       5.2       116       133        60
OIR    2025250     91400   18.2600 -112.5700       5.1       116       132        60
OIR    2025250     91400   18.2600 -112.5800       5.1       116       132        60
OIR    2025250     91400   18.2600 -112.5900       5.1       116       131        60
OIR    2025250     91400   18.2600 -112.6000       5.0       116       133        60
OIR    2025250     91400   18.2600 -112.6100       5.0       116       136        60
OIR    2025250     91400   18.2600 -112.6200       5.0       116       136        60
OIR    2025250     91400   18.2600 -112.6300       5.0       116       134        60
OIR    2025250     91400   18.2600 -112.6400       5.0       116       132        60
OIR    2025250     91400   18.2600 -112.6500       5.0       117       131        60
OIR    2025250     91400   18.2600 -112.6600       5.1       119       131        60
OIR    2025250     91400   18.2600 -112.6700       5.2       123       134        60
OIR    2025250     91400   18.2600 -112.6800       5.2       125       137        60
OIR    2025250     91400   18.2600 -112.6900       5.2       125       137        60
OIR    2025250     91400   18.2600 -112.7000       5.2       126       136        60
OIR    2025250     91400   18.2600 -112.7100       5.2       126       135        60
OIR    2025250     91400   18.2600 -112.7200       5.2       126       136        60
OIR    2025250     91400   18.2600 -112.7300       5.2       126       137        60
OIR    2025250     91400   18.2600 -112.7400       5.2       126       136        60
OIR    2025250     91400   18.2600 -112.7500       5.3       126       135        60
OIR    2025250     91400   18.2600 -112.7600       5.4       126       134        60
OIR    2025250     91400   18.2600 -112.7700       5.5       126       134        60
OIR    2025250     91400   18.2600 -112.7800       5.6       126       133        60
OIR    2025250     91400   18.2600 -112.7900       6.3       125       129        60
OIR    2025250     91400   18.2600 -112.8000       6.5       125       124        60
OIR    2025250     91400   18.2600 -112.8100       6.6       125       124        60
OIR    2025250     91400   18.2600 -112.8200       6.6       125       124        60
OIR    2025250     91400   18.2600 -112.8300       6.6       125       127        60
OIR    2025250     91400   18.2600 -112.8400       6.7       124       132        60
OIR    2025250     91400   18.2600 -112.8500       6.8       124       132        60
OIR    2025250     91400   18.2600 -112.8600       7.0       123       131        60
OIR    2025250     91400   18.2600 -112.8700       7.0       122       131        60
OIR    2025250     91400   18.2600 -112.8800       7.1       122       133        60
OIR    2025250     91400   18.2600 -112.8900       7.1       121       136        60
OIR    2025250     91400   18.2600 -112.9000       7.1       121       134        60
OIR    2025250     91400   18.2600 -112.9100       7.2       121       131        60
OIR    2025250     91400   18.2600 -112.9200       7.2       121       129        60
OIR    2025250     91400   18.2600 -112.9300       7.2       120       129        60
OIR    2025250     91400   18.2600 -112.9400       7.2       120       128        60
OIR    2025250     91400   18.2600 -112.9500       7.3       120       126        60
OIR    2025250     91400   18.2600 -112.9600       7.4       120       124        60
OIR    2025250     91400   18.2600 -112.9700       7.5       119       123        60
OIR    2025250     91400   18.2600 -112.9800       7.6       119       122        60
OIR    2025250     91400   18.2600 -112.9900       7.7       118       122        60
OIR    2025250     91400   18.2600 -113.0000       7.7       117       121        60
OIR    2025250     91400   18.2600 -113.0100       7.7       116       121        60
OIR    2025250     91400   18.2600 -113.0200       7.6       115       125        60
OIR    2025250     91400   18.2600 -113.0300       7.6       114       128        60
OIR    2025250     91400   18.2600 -113.0400       7.6       114       133        60
OIR    2025250     91400   18.2600 -113.0500       7.6       114       138        60
OIR    2025250     91400   18.2600 -113.0600       7.5       114       140        60
OIR    2025250     91400   18.2600 -113.0700       7.5       114       141        60
OIR    2025250     91400   18.2600 -113.0800       7.5       114       143        60
OIR    2025250     91400   18.2600 -113.1100       7.5       110       135        60
OIR    2025250     91400   18.2600 -113.1200       7.5       109       126        60
OIR    2025250     91400   18.2600 -113.1300       7.4       108       124        60
OIR    2025250     91400   18.2600 -113.1400       7.4       107       124        60
OIR    2025250     91400   18.2600 -113.1500       7.3       106       123        60
OIR    2025250     91400   18.2600 -113.1600       6.6       102       124        60
OIR    2025250     91400   18.2600 -113.1700       5.1        93       125        60
OIR    2025250     91400   18.2600 -113.1800       4.3        83       129        60
OIR    2025250     91400   18.2600 -113.1900       4.0        79       132        60
OIR    2025250     91400   18.2600 -113.2000       4.0        79       131        60
OIR    2025250     91400   18.2600 -113.3200       4.0        94       143        60
OIR    2025250     91400   18.2600 -113.3300       4.2        94       142        60
OIR    2025250     91400   18.2600 -113.3400       5.0        96       143        60
OIR    2025250     91400   18.2600 -113.8000       4.6       179       137        60
OIR    2025250     91400   18.2600 -113.8100       4.6       177       132        60
OIR    2025250     91400   18.2600 -113.8200       4.6       177       130        60
OIR    2025250     91400   18.2600 -113.8300       4.6       175       127        60
OIR    2025250     91400   18.2600 -113.8400       4.5       171       128        60
OIR    2025250     91400   18.2600 -113.8500       4.5       169       129        60
OIR    2025250     91400   18.2600 -113.8600       4.4       167       129        60
OIR    2025250     91400   18.2600 -113.8700       4.3       166       129        60
OIR    2025250     91400   18.2600 -113.8800       4.2       164       132        60
OIR    2025250     91400   18.2600 -113.8900       4.2       162       137        60
OIR    2025250     91400   18.2600 -113.9000       4.1       161       142        60
OIR    2025250     91400   18.2600 -114.2800       4.1       260       130        60
OIR    2025250     91400   18.2600 -114.2900       4.4       260       132        60
OIR    2025250     91400   18.2600 -114.3000       4.6       261       135        60
OIR    2025250     91400   18.2600 -114.3100       4.8       262       139        60
OIR    2025250     91400   18.2600 -118.1700      20.4        32       136        60
OIR    2025250     91400   18.2600 -118.1800      21.4        30       133        60
OIR    2025250     91400   18.2600 -118.1900      21.4        29       131        60
OIR    2025250     91400   18.2600 -118.2000      21.8        29       133        60
OIR    2025250     91400   18.2600 -118.2100      24.2        33       134        60
OIR    2025250     91400   18.2600 -118.2200      24.3        33       138        60
OIR    2025250     91400   18.2600 -118.2300      24.4        35       142        60
OIR    2025250     91400   18.2500 -108.6100      13.7        52       142        60
OIR    2025250     91400   18.2500 -108.7600      12.8        62       142        60
OIR    2025250     91400   18.2500 -108.7700      12.6        64       140        60
OIR    2025250     91400   18.2500 -108.7800      12.3        67       138        60
OIR    2025250     91400   18.2500 -108.7900      11.8        68       137        60
OIR    2025250     91400   18.2500 -108.8000      11.4        69       137        60
OIR    2025250     91400   18.2500 -108.8100      11.1        69       137        60
OIR    2025250     91400   18.2500 -108.8200      11.0        68       139        60
OIR    2025250     91400   18.2500 -108.8300      10.9        68       141        60
OIR    2025250     91400   18.2500 -108.8700      10.8        67       142        60
OIR    2025250     91400   18.2500 -108.8800      10.8        67       139        60
OIR    2025250     91400   18.2500 -108.8900      10.8        67       137        60
OIR    2025250     91400   18.2500 -108.9000      10.8        67       135        60
OIR    2025250     91400   18.2500 -108.9100      10.8        67       132        60
OIR    2025250     91400   18.2500 -108.9200      10.9        67       131        60
OIR    2025250     91400   18.2500 -108.9300      11.0        67       129        60
OIR    2025250     91400   18.2500 -108.9400      11.3        67       128        60
OIR    2025250     91400   18.2500 -108.9500      11.8        66       127        60
OIR    2025250     91400   18.2500 -108.9600      12.0        65       126        60
OIR    2025250     91400   18.2500 -108.9700      12.4        64       126        60
OIR    2025250     91400   18.2500 -108.9800      13.0        63       125        60
OIR    2025250     91400   18.2500 -108.9900      13.5        61       126        60
OIR    2025250     91400   18.2500 -109.0000      13.9        60       126        60
OIR    2025250     91400   18.2500 -109.0100      14.2        60       127        60
OIR    2025250     91400   18.2500 -109.0200      14.4        59       127        60
OIR    2025250     91400   18.2500 -109.0300      14.5        59       127        60
OIR    2025250     91400   18.2500 -109.0400      14.6        59       129        60
OIR    2025250     91400   18.2500 -109.0500      14.6        59       130        60
OIR    2025250     91400   18.2500 -109.0600      14.6        59       130        60
OIR    2025250     91400   18.2500 -109.0700      14.6        59       130        60
OIR    2025250     91400   18.2500 -109.0800      14.6        59       129        60
OIR    2025250     91400   18.2500 -109.0900      14.6        59       128        60
OIR    2025250     91400   18.2500 -109.1000      14.7        59       128        60
OIR    2025250     91400   18.2500 -109.1100      14.7        59       127        60
OIR    2025250     91400   18.2500 -109.1200      14.7        59       126        60
OIR    2025250     91400   18.2500 -109.1300      14.7        59       127        60
OIR    2025250     91400   18.2500 -109.1400      14.8        60       129        60
OIR    2025250     91400   18.2500 -109.1500      14.8        60       130        60
OIR    2025250     91400   18.2500 -109.1600      14.9        60       131        60
OIR    2025250     91400   18.2500 -109.1700      15.0        60       132        60
OIR    2025250     91400   18.2500 -109.1800      15.1        60       132        60
OIR    2025250     91400   18.2500 -109.1900      15.1        60       131        60
OIR    2025250     91400   18.2500 -109.2000      15.2        60       130        60
OIR    2025250     91400   18.2500 -109.2100      15.3        61       130        60
OIR    2025250     91400   18.2500 -109.2200      15.4        61       130        60
OIR    2025250     91400   18.2500 -109.2300      16.3        61       130        60
OIR    2025250     91400   18.2500 -109.2400      18.5        61       132        60
OIR    2025250     91400   18.2500 -109.2500      20.1        60       133        60
OIR    2025250     91400   18.2500 -109.2600      20.5        59       135        60
OIR    2025250     91400   18.2500 -109.2700      20.8        59       137        60
OIR    2025250     91400   18.2500 -109.2800      21.1        59       136        60
OIR    2025250     91400   18.2500 -109.2900      21.3        59       135        60
OIR    2025250     91400   18.2500 -109.3000      21.4        59       139        60
OIR    2025250     91400   18.2500 -110.9000      16.7        56       143        60
OIR    2025250     91400   18.2500 -110.9100      16.8        56       143        60
OIR    2025250     91400   18.2500 -111.2200      12.2        65       142        60
OIR    2025250     91400   18.2500 -111.2300      12.1        67       137        60
OIR    2025250     91400   18.2500 -111.2400      12.2        71       133        60
OIR    2025250     91400   18.2500 -111.2500      12.3        72       134        60
OIR    2025250     91400   18.2500 -111.2600      12.3        73       134        60
OIR    2025250     91400   18.2500 -111.2700      12.3        73       132        60
OIR    2025250     91400   18.2500 -111.2800      12.3        73       130        60
OIR    2025250     91400   18.2500 -111.2900      12.3        74       127        60
OIR    2025250     91400   18.2500 -111.3000      12.2        74       123        60
OIR    2025250     91400   18.2500 -111.3100      12.2        74       120        60
OIR    2025250     91400   18.2500 -111.3200      12.2        74       117        60
OIR    2025250     91400   18.2500 -111.3300      12.2        74       116        60
OIR    2025250     91400   18.2500 -111.3400      12.1        74       115        60
OIR    2025250     91400   18.2500 -111.3500      12.1        75       114        60
OIR    2025250     91400   18.2500 -111.3600      12.1        75       114        60
OIR    2025250     91400   18.2500 -111.3700      12.1        75       114        60
OIR    2025250     91400   18.2500 -111.3800      12.1        75       114        60
OIR    2025250     91400   18.2500 -111.3900      12.1        75       113        60
OIR    2025250     91400   18.2500 -111.4000      12.0        75       112        60
OIR    2025250     91400   18.2500 -111.4100      12.0        76       111        60
OIR    2025250     91400   18.2500 -111.4200      12.0        76       111        60
OIR    2025250     91400   18.2500 -111.4300      12.0        76       110        60
OIR    2025250     91400   18.2500 -111.4400      12.0        76       109        60
OIR    2025250     91400   18.2500 -111.4500      12.0        76       108        60
OIR    2025250     91400   18.2500 -111.4600      12.0        76       107        60
OIR    2025250     91400   18.2500 -111.4700      12.0        76       104        60
OIR    2025250     91400   18.2500 -111.4800      11.9        76       104        60
OIR    2025250     91400   18.2500 -111.4900      11.9        76       105        60
OIR    2025250     91400   18.2500 -111.5000      11.9        76       105        60
OIR    2025250     91400   18.2500 -111.5100      11.9        76       104        60
OIR    2025250     91400   18.2500 -111.5200      11.9        76       103        60
OIR    2025250     91400   18.2500 -111.5300      11.8        76       103        60
OIR    2025250     91400   18.2500 -111.5400      11.8        76       104        60
OIR    2025250     91400   18.2500 -111.5500      11.7        75       104        60
OIR    2025250     91400   18.2500 -111.5600      11.5        75       103        60
OIR    2025250     91400   18.2500 -111.5700      11.3        75       103        60
OIR    2025250     91400   18.2500 -111.5800      10.7        75       103        60
OIR    2025250     91400   18.2500 -111.5900       9.8        75       103        60
OIR    2025250     91400   18.2500 -111.6000       8.9        76       103        60
OIR    2025250     91400   18.2500 -111.6100       8.8        76       103        60
OIR    2025250     91400   18.2500 -111.6200       8.7        76       103        60
OIR    2025250     91400   18.2500 -111.6300       8.7        76       103        60
OIR    2025250     91400   18.2500 -111.6400       8.6        76       103        60
OIR    2025250     91400   18.2500 -111.6500       8.5        76       103        60
OIR    2025250     91400   18.2500 -111.6600       8.1        76       103        60
OIR    2025250     91400   18.2500 -111.6700       7.3        78       104        60
OIR    2025250     91400   18.2500 -111.6800       6.6        80       104        60
OIR    2025250     91400   18.2500 -111.6900       5.7        85       104        60
OIR    2025250     91400   18.2500 -111.7000       4.9        92       108        60
OIR    2025250     91400   18.2500 -111.7100       4.4       105       110        60
OIR    2025250     91400   18.2500 -111.7300       4.1       141       110        60
OIR    2025250     91400   18.2500 -111.7400       4.2       143       109        60
OIR    2025250     91400   18.2500 -111.7500       4.2       144       108        60
OIR    2025250     91400   18.2500 -111.7600       4.3       143       107        60
OIR    2025250     91400   18.2500 -111.7700       7.5       122       104        60
OIR    2025250     91400   18.2500 -111.7800      10.5       114       104        60
OIR    2025250     91400   18.2500 -111.7900      11.8       105       105        60
OIR    2025250     91400   18.2500 -111.8000      11.4       100       108        60
OIR    2025250     91400   18.2500 -111.8100      13.0        75       116        60
OIR    2025250     91400   18.2500 -111.8200      14.0        64       125        60
OIR    2025250     91400   18.2500 -111.8300      14.3        58       133        60
OIR    2025250     91400   18.2500 -111.8400      12.9        52       141        60
OIR    2025250     91400   18.2500 -112.1400      12.1        89       142        60
OIR    2025250     91400   18.2500 -112.1500      12.2        89       138        60
OIR    2025250     91400   18.2500 -112.1600      12.2        89       136        60
OIR    2025250     91400   18.2500 -112.1700      12.2        89       135        60
OIR    2025250     91400   18.2500 -112.1800      12.2        89       134        60
OIR    2025250     91400   18.2500 -112.1900      12.2        89       135        60
OIR    2025250     91400   18.2500 -112.2000      12.2        89       135        60
OIR    2025250     91400   18.2500 -112.2100      12.2        89       135        60
OIR    2025250     91400   18.2500 -112.2200      12.2        89       135        60
OIR    2025250     91400   18.2500 -112.2300      12.2        89       134        60
OIR    2025250     91400   18.2500 -112.2400      12.2        89       133        60
OIR    2025250     91400   18.2500 -112.2500      12.2        89       133        60
OIR    2025250     91400   18.2500 -112.2600      12.2        89       133        60
OIR    2025250     91400   18.2500 -112.2700      12.2        89       133        60
OIR    2025250     91400   18.2500 -112.2800      12.2        89       132        60
OIR    2025250     91400   18.2500 -112.2900      12.2        89       131        60
OIR    2025250     91400   18.2500 -112.3000      12.2        89       131        60
OIR    2025250     91400   18.2500 -112.3100      12.2        90       131        60
OIR    2025250     91400   18.2500 -112.3200      12.2        90       131        60
OIR    2025250     91400   18.2500 -112.3300      12.1        90       131        60
OIR    2025250     91400   18.2500 -112.3400      12.1        90       132        60
OIR    2025250     91400   18.2500 -112.3500      12.0        90       134        60
OIR    2025250     91400   18.2500 -112.3600      12.0        91       137        60
OIR    2025250     91400   18.2500 -112.3700      11.8        91       138        60
OIR    2025250     91400   18.2500 -112.3800      11.2        93       140        60
OIR    2025250     91400   18.2500 -112.3900      10.2        97       141        60
OIR    2025250     91400   18.2500 -112.4000       9.4       100       141        60
OIR    2025250     91400   18.2500 -112.4100       8.0       107       141        60
OIR    2025250     91400   18.2500 -112.4200       7.0       113       140        60
OIR    2025250     91400   18.2500 -112.4300       6.6       115       139        60
OIR    2025250     91400   18.2500 -112.4400       6.5       116       135        60
OIR    2025250     91400   18.2500 -112.4500       6.7       116       129        60
OIR    2025250     91400   18.2500 -112.4600       6.6       118       129        60
OIR    2025250     91400   18.2500 -112.4700       6.5       119       133        60
OIR    2025250     91400   18.2500 -112.4800       6.1       119       136        60
OIR    2025250     91400   18.2500 -112.4900       5.6       117       138        60
OIR    2025250     91400   18.2500 -112.5000       5.4       117       140        60
OIR    2025250     91400   18.2500 -112.5100       5.4       117       137        60
OIR    2025250     91400   18.2500 -112.5200       5.3       117       134        60
OIR    2025250     91400   18.2500 -112.5300       5.3       116       133        60
OIR    2025250     91400   18.2500 -112.5400       5.3       116       135        60
OIR    2025250     91400   18.2500 -112.5500       5.2       116       136        60
OIR    2025250     91400   18.2500 -112.5600       5.2       116       134        60
OIR    2025250     91400   18.2500 -112.5700       5.1       116       132        60
OIR    2025250     91400   18.2500 -112.5800       5.1       116       132        60
OIR    2025250     91400   18.2500 -112.5900       5.1       116       133        60
OIR    2025250     91400   18.2500 -112.6000       5.0       116       134        60
OIR    2025250     91400   18.2500 -112.6100       5.0       116       134        60
OIR    2025250     91400   18.2500 -112.6200       5.0       116       135        60
OIR    2025250     91400   18.2500 -112.6300       5.0       116       136        60
OIR    2025250     91400   18.2500 -112.6400       5.0       117       136        60
OIR    2025250     91400   18.2500 -112.6500       5.0       117       137        60
OIR    2025250     91400   18.2500 -112.6600       5.1       120       137        60
OIR    2025250     91400   18.2500 -112.6700       5.2       124       138        60
OIR    2025250     91400   18.2500 -112.6800       5.2       125       138        60
OIR    2025250     91400   18.2500 -112.6900       5.2       126       139        60
OIR    2025250     91400   18.2500 -112.7000       5.2       126       140        60
OIR    2025250     91400   18.2500 -112.7100       5.2       126       140        60
OIR    2025250     91400   18.2500 -112.7200       5.2       126       141        60
OIR    2025250     91400   18.2500 -112.7300       5.2       126       141        60
OIR    2025250     91400   18.2500 -112.7400       5.2       126       141        60
OIR    2025250     91400   18.2500 -112.7500       5.3       126       140        60
OIR    2025250     91400   18.2500 -112.7600       5.4       126       137        60
OIR    2025250     91400   18.2500 -112.7700       5.6       126       135        60
OIR    2025250     91400   18.2500 -112.7800       5.8       126       133        60
OIR    2025250     91400   18.2500 -112.7900       6.5       125       130        60
OIR    2025250     91400   18.2500 -112.8000       6.6       125       127        60
OIR    2025250     91400   18.2500 -112.8100       6.6       125       127        60
OIR    2025250     91400   18.2500 -112.8200       6.6       125       128        60
OIR    2025250     91400   18.2500 -112.8300       6.6       125       130        60
OIR    2025250     91400   18.2500 -112.8400       6.6       125       134        60
OIR    2025250     91400   18.2500 -112.8500       6.6       125       137        60
OIR    2025250     91400   18.2500 -112.8600       6.7       124       135        60
OIR    2025250     91400   18.2500 -112.8700       6.8       123       134        60
OIR    2025250     91400   18.2500 -112.8800       6.8       123       135        60
OIR    2025250     91400   18.2500 -112.8900       7.0       122       135        60
OIR    2025250     91400   18.2500 -112.9000       7.1       121       134        60
OIR    2025250     91400   18.2500 -112.9100       7.1       121       131        60
OIR    2025250     91400   18.2500 -112.9200       7.1       121       130        60
OIR    2025250     91400   18.2500 -112.9300       7.2       120       129        60
OIR    2025250     91400   18.2500 -112.9400       7.2       120       129        60
OIR    2025250     91400   18.2500 -112.9500       7.3       120       127        60
OIR    2025250     91400   18.2500 -112.9600       7.5       120       124        60
OIR    2025250     91400   18.2500 -112.9700       7.6       119       123        60
OIR    2025250     91400   18.2500 -112.9800       7.6       119       122        60
OIR    2025250     91400   18.2500 -112.9900       7.7       118       121        60
OIR    2025250     91400   18.2500 -113.0000       7.7       118       121        60
OIR    2025250     91400   18.2500 -113.0100       7.7       117       121        60
OIR    2025250     91400   18.2500 -113.0200       7.6       115       125        60
OIR    2025250     91400   18.2500 -113.0300       7.6       114       130        60
OIR    2025250     91400   18.2500 -113.0400       7.6       114       134        60
OIR    2025250     91400   18.2500 -113.0500       7.5       114       138        60
OIR    2025250     91400   18.2500 -113.0600       7.4       114       140        60
OIR    2025250     91400   18.2500 -113.0700       7.4       114       141        60
OIR    2025250     91400   18.2500 -113.0800       7.5       114       142        60
OIR    2025250     91400   18.2500 -113.0900       7.5       113       143        60
OIR    2025250     91400   18.2500 -113.1100       7.4       110       137        60
OIR    2025250     91400   18.2500 -113.1200       7.4       107       127        60
OIR    2025250     91400   18.2500 -113.1300       7.2       105       123        60
OIR    2025250     91400   18.2500 -113.1400       7.1       104       123        60
OIR    2025250     91400   18.2500 -113.1500       6.6       101       124        60
OIR    2025250     91400   18.2500 -113.1600       5.5        92       125        60
OIR    2025250     91400   18.2500 -113.1700       4.5        82       127        60
OIR    2025250     91400   18.2500 -113.1800       4.1        77       131        60
OIR    2025250     91400   18.2500 -113.1900       4.0        77       135        60
OIR    2025250     91400   18.2500 -113.2000       4.0        77       132        60
OIR    2025250     91400   18.2500 -113.2900       4.0        88       141        60
OIR    2025250     91400   18.2500 -113.3300       4.7        94       143        60
OIR    2025250     91400   18.2500 -113.8000       4.6       178       137        60
OIR    2025250     91400   18.2500 -113.8100       4.6       178       130        60
OIR    2025250     91400   18.2500 -113.8200       4.6       177       128        60
OIR    2025250     91400   18.2500 -113.8300       4.6       176       126        60
OIR    2025250     91400   18.2500 -113.8400       4.5       172       127        60
OIR    2025250     91400   18.2500 -113.8500       4.4       170       129        60
OIR    2025250     91400   18.2500 -113.8600       4.4       169       130        60
OIR    2025250     91400   18.2500 -113.8700       4.3       168       130        60
OIR    2025250     91400   18.2500 -113.8800       4.3       167       133        60
OIR    2025250     91400   18.2500 -113.8900       4.2       165       139        60
OIR    2025250     91400   18.2500 -114.2900       4.1       262       131        60
OIR    2025250     91400   18.2500 -114.3000       4.3       264       134        60
OIR    2025250     91400   18.2500 -114.3100       4.3       266       137        60
OIR    2025250     91400   18.2500 -114.3200       4.2       270       142        60
OIR    2025250     91400   18.2500 -118.1700      21.1        30       137        60
OIR    2025250     91400   18.2500 -118.1800      22.3        29       132        60
OIR    2025250     91400   18.2500 -118.1900      22.6        29       130        60
OIR    2025250     91400   18.2500 -118.2000      22.7        29       129        60
OIR    2025250     91400   18.2500 -118.2100      24.2        33       129        60
OIR    2025250     91400   18.2500 -118.2200      24.3        33       134        60
OIR    2025250     91400   18.2500 -118.2300      24.5        34       140        60
OIR    2025250     91400   18.2400 -108.7600      12.2        63       142        60
OIR    2025250     91400   18.2400 -108.7700      12.0        65       140        60
OIR    2025250     91400   18.2400 -108.7800      11.8        66       138        60
OIR    2025250     91400   18.2400 -108.7900      11.5        67       137        60
OIR    2025250     91400   18.2400 -108.8000      11.2        68       138        60
OIR    2025250     91400   18.2400 -108.8100      11.0        68       139        60
OIR    2025250     91400   18.2400 -108.8200      10.9        68       141        60
OIR    2025250     91400   18.2400 -108.8800      10.7        67       142        60
OIR    2025250     91400   18.2400 -108.8900      10.7        67       140        60
OIR    2025250     91400   18.2400 -108.9000      10.8        67       138        60
OIR    2025250     91400   18.2400 -108.9100      10.8        67       136        60
OIR    2025250     91400   18.2400 -108.9200      10.8        68       134        60
OIR    2025250     91400   18.2400 -108.9300      10.9        68       132        60
OIR    2025250     91400   18.2400 -108.9400      11.0        68       130        60
OIR    2025250     91400   18.2400 -108.9500      11.1        68       128        60
OIR    2025250     91400   18.2400 -108.9600      11.2        68       128        60
OIR    2025250     91400   18.2400 -108.9700      11.4        67       127        60
OIR    2025250     91400   18.2400 -108.9800      11.8        66       126        60
OIR    2025250     91400   18.2400 -108.9900      12.4        64       126        60
OIR    2025250     91400   18.2400 -109.0000      13.0        63       126        60
OIR    2025250     91400   18.2400 -109.0100      13.5        61       127        60
OIR    2025250     91400   18.2400 -109.0200      14.1        60       128        60
OIR    2025250     91400   18.2400 -109.0300      14.4        59       128        60
OIR    2025250     91400   18.2400 -109.0400      14.5        59       129        60
OIR    2025250     91400   18.2400 -109.0500      14.6        59       130        60
OIR    2025250     91400   18.2400 -109.0600      14.6        59       130        60
OIR    2025250     91400   18.2400 -109.0700      14.6        59       130        60
OIR    2025250     91400   18.2400 -109.0800      14.6        59       130        60
OIR    2025250     91400   18.2400 -109.0900      14.6        59       129        60
OIR    2025250     91400   18.2400 -109.1000      14.6        59       127        60
OIR    2025250     91400   18.2400 -109.1100      14.7        59       127        60
OIR    2025250     91400   18.2400 -109.1200      14.7        60       127        60
OIR    2025250     91400   18.2400 -109.1300      14.7        60       128        60
OIR    2025250     91400   18.2400 -109.1400      14.8        60       129        60
OIR    2025250     91400   18.2400 -109.1500      14.8        60       131        60
OIR    2025250     91400   18.2400 -109.1600      14.9        60       132        60
OIR    2025250     91400   18.2400 -109.1700      15.0        60       132        60
OIR    2025250     91400   18.2400 -109.1800      15.0        60       132        60
OIR    2025250     91400   18.2400 -109.1900      15.1        61       132        60
OIR    2025250     91400   18.2400 -109.2000      15.1        61       132        60
OIR    2025250     91400   18.2400 -109.2100      15.3        61       132        60
OIR    2025250     91400   18.2400 -109.2200      15.3        61       131        60
OIR    2025250     91400   18.2400 -109.2300      15.8        61       132        60
OIR    2025250     91400   18.2400 -109.2400      18.1        61       134        60
OIR    2025250     91400   18.2400 -109.2500      19.8        60       136        60
OIR    2025250     91400   18.2400 -109.2600      20.4        60       137        60
OIR    2025250     91400   18.2400 -109.2700      20.8        60       139        60
OIR    2025250     91400   18.2400 -109.2800      21.0        60       140        60
OIR    2025250     91400   18.2400 -109.2900      21.3        60       141        60
OIR    2025250     91400   18.2400 -110.9100      16.8        56       144        60
OIR    2025250     91400   18.2400 -111.2200      12.1        65       141        60
OIR    2025250     91400   18.2400 -111.2300      12.0        68       136        60
OIR    2025250     91400   18.2400 -111.2400      12.0        72       131        60
OIR    2025250     91400   18.2400 -111.2500      12.1        73       129        60
OIR    2025250     91400   18.2400 -111.2600      12.1        74       128        60
OIR    2025250     91400   18.2400 -111.2700      12.2        74       127        60
OIR    2025250     91400   18.2400 -111.2800      12.2        74       126        60
OIR    2025250     91400   18.2400 -111.2900      12.1        74       124        60
OIR    2025250     91400   18.2400 -111.3000      12.1        74       121        60
OIR    2025250     91400   18.2400 -111.3100      12.1        74       117        60
OIR    2025250     91400   18.2400 -111.3200      12.1        75       116        60
OIR    2025250     91400   18.2400 -111.3300      12.1        75       114        60
OIR    2025250     91400   18.2400 -111.3400      12.1        75       113        60
OIR    2025250     91400   18.2400 -111.3500      12.1        75       112        60
OIR    2025250     91400   18.2400 -111.3600      12.1        75       112        60
OIR    2025250     91400   18.2400 -111.3700      12.1        75       112        60
OIR    2025250     91400   18.2400 -111.3800      12.0        75       112        60
OIR    2025250     91400   18.2400 -111.3900      12.0        76       112        60
OIR    2025250     91400   18.2400 -111.4000      12.0        76       111        60
OIR    2025250     91400   18.2400 -111.4100      12.0        76       110        60
OIR    2025250     91400   18.2400 -111.4200      12.0        76       109        60
OIR    2025250     91400   18.2400 -111.4300      12.0        76       108        60
OIR    2025250     91400   18.2400 -111.4400      12.0        76       107        60
OIR    2025250     91400   18.2400 -111.4500      12.0        76       105        60
OIR    2025250     91400   18.2400 -111.4600      12.0        76       104        60
OIR    2025250     91400   18.2400 -111.4700      11.9        76       104        60
OIR    2025250     91400   18.2400 -111.4800      11.9        76       104        60
OIR    2025250     91400   18.2400 -111.4900      11.9        76       104        60
OIR    2025250     91400   18.2400 -111.5000      11.9        76       104        60
OIR    2025250     91400   18.2400 -111.5100      11.9        76       104        60
OIR    2025250     91400   18.2400 -111.5200      11.8        76       103        60
OIR    2025250     91400   18.2400 -111.5300      11.8        76       104        60
OIR    2025250     91400   18.2400 -111.5400      11.7        76       104        60
OIR    2025250     91400   18.2400 -111.5500      11.6        76       104        60
OIR    2025250     91400   18.2400 -111.5600      11.4        76       104        60
OIR    2025250     91400   18.2400 -111.5700      11.2        75       103        60
OIR    2025250     91400   18.2400 -111.5800      10.6        75       103        60
OIR    2025250     91400   18.2400 -111.5900       9.6        75       103        60
OIR    2025250     91400   18.2400 -111.6000       9.0        76       103        60
OIR    2025250     91400   18.2400 -111.6100       8.8        76       103        60
OIR    2025250     91400   18.2400 -111.6200       8.8        76       103        60
OIR    2025250     91400   18.2400 -111.6300       8.7        76       103        60
OIR    2025250     91400   18.2400 -111.6400       8.6        76       103        60
OIR    2025250     91400   18.2400 -111.6500       8.5        76       103        60
OIR    2025250     91400   18.2400 -111.6600       8.2        76       103        60
OIR    2025250     91400   18.2400 -111.6700       7.6        77       103        60
OIR    2025250     91400   18.2400 -111.6800       6.9        78       104        60
OIR    2025250     91400   18.2400 -111.6900       6.4        80       104        60
OIR    2025250     91400   18.2400 -111.7000       6.0        84       105        60
OIR    2025250     91400   18.2400 -111.7100       5.6        90       108        60
OIR    2025250     91400   18.2400 -111.7200       4.4       100       109        60
OIR    2025250     91400   18.2400 -111.7400       4.2       148       110        60
OIR    2025250     91400   18.2400 -111.7500       4.3       150       109        60
OIR    2025250     91400   18.2400 -111.7600       4.5       149       108        60
OIR    2025250     91400   18.2400 -111.7700       8.7       119       107        60
OIR    2025250     91400   18.2400 -111.7800      10.6       113       104        60
OIR    2025250     91400   18.2400 -111.7900      11.8       104       107        60
OIR    2025250     91400   18.2400 -111.8000      11.3        97       109        60
OIR    2025250     91400   18.2400 -111.8100      11.8        68       113        60
OIR    2025250     91400   18.2400 -111.8200      12.9        56       119        60
OIR    2025250     91400   18.2400 -111.8300      13.5        51       126        60
OIR    2025250     91400   18.2400 -111.8400      13.3        50       135        60
OIR    2025250     91400   18.2400 -111.8500      13.0        51       143        60
OIR    2025250     91400   18.2400 -112.1400      12.2        88       142        60
OIR    2025250     91400   18.2400 -112.1500      12.2        89       139        60
OIR    2025250     91400   18.2400 -112.1600      12.2        89       138        60
OIR    2025250     91400   18.2400 -112.1700      12.2        89       136        60
OIR    2025250     91400   18.2400 -112.1800      12.2        89       135        60
OIR    2025250     91400   18.2400 -112.1900      12.2        89       134        60
OIR    2025250     91400   18.2400 -112.2000      12.2        89       133        60
OIR    2025250     91400   18.2400 -112.2100      12.2        89       133        60
OIR    2025250     91400   18.2400 -112.2200      12.2        89       133        60
OIR    2025250     91400   18.2400 -112.2300      12.2        89       133        60
OIR    2025250     91400   18.2400 -112.2400      12.2        89       133        60
OIR    2025250     91400   18.2400 -112.2500      12.2        89       132        60
OIR    2025250     91400   18.2400 -112.2600      12.2        89       130        60
OIR    2025250     91400   18.2400 -112.2700      12.2        89       129        60
OIR    2025250     91400   18.2400 -112.2800      12.2        89       128        60
OIR    2025250     91400   18.2400 -112.2900      12.2        89       127        60
OIR    2025250     91400   18.2400 -112.3000      12.2        89       127        60
OIR    2025250     91400   18.2400 -112.3100      12.2        90       128        60
OIR    2025250     91400   18.2400 -112.3200      12.2        90       130        60
OIR    2025250     91400   18.2400 -112.3300      12.1        90       131        60
OIR    2025250     91400   18.2400 -112.3400      12.1        90       132        60
OIR    2025250     91400   18.2400 -112.3500      12.1        90       133        60
OIR    2025250     91400   18.2400 -112.3600      12.0        91       135        60
OIR    2025250     91400   18.2400 -112.3700      11.8        92       136        60
OIR    2025250     91400   18.2400 -112.3800      11.2        94       136        60
OIR    2025250     91400   18.2400 -112.3900      10.4        98       137        60
OIR    2025250     91400   18.2400 -112.4000       9.9       101       137        60
OIR    2025250     91400   18.2400 -112.4100       9.1       105       137        60
OIR    2025250     91400   18.2400 -112.4200       8.0       112       135        60
OIR    2025250     91400   18.2400 -112.4300       7.5       116       133        60
OIR    2025250     91400   18.2400 -112.4400       7.3       117       129        60
OIR    2025250     91400   18.2400 -112.4500       7.4       118       125        60
OIR    2025250     91400   18.2400 -112.4600       7.2       120       122        60
OIR    2025250     91400   18.2400 -112.4700       7.1       120       126        60
OIR    2025250     91400   18.2400 -112.4800       6.7       119       129        60
OIR    2025250     91400   18.2400 -112.4900       5.7       118       133        60
OIR    2025250     91400   18.2400 -112.5000       5.4       117       136        60
OIR    2025250     91400   18.2400 -112.5100       5.3       117       135        60
OIR    2025250     91400   18.2400 -112.5200       5.3       117       133        60
OIR    2025250     91400   18.2400 -112.5300       5.3       117       133        60
OIR    2025250     91400   18.2400 -112.5400       5.3       117       135        60
OIR    2025250     91400   18.2400 -112.5500       5.2       117       137        60
OIR    2025250     91400   18.2400 -112.5600       5.2       117       135        60
OIR    2025250     91400   18.2400 -112.5700       5.1       117       133        60
OIR    2025250     91400   18.2400 -112.5800       5.1       117       133        60
OIR    2025250     91400   18.2400 -112.5900       5.0       117       133        60
OIR    2025250     91400   18.2400 -112.6000       5.0       117       132        60
OIR    2025250     91400   18.2400 -112.6100       5.0       117       132        60
OIR    2025250     91400   18.2400 -112.6200       5.0       117       132        60
OIR    2025250     91400   18.2400 -112.6300       5.0       117       134        60
OIR    2025250     91400   18.2400 -112.6400       5.0       117       136        60
OIR    2025250     91400   18.2400 -112.6500       5.0       118       138        60
OIR    2025250     91400   18.2400 -112.6600       5.1       121       140        60
OIR    2025250     91400   18.2400 -112.6700       5.1       125       140        60
OIR    2025250     91400   18.2400 -112.6800       5.1       126       138        60
OIR    2025250     91400   18.2400 -112.6900       5.1       126       139        60
OIR    2025250     91400   18.2400 -112.7000       5.2       126       141        60
OIR    2025250     91400   18.2400 -112.7500       5.3       126       143        60
OIR    2025250     91400   18.2400 -112.7600       5.4       126       141        60
OIR    2025250     91400   18.2400 -112.7700       5.6       126       137        60
OIR    2025250     91400   18.2400 -112.7800       6.0       126       132        60
OIR    2025250     91400   18.2400 -112.7900       6.6       125       131        60
OIR    2025250     91400   18.2400 -112.8000       6.6       125       130        60
OIR    2025250     91400   18.2400 -112.8100       6.6       125       130        60
OIR    2025250     91400   18.2400 -112.8200       6.6       125       131        60
OIR    2025250     91400   18.2400 -112.8300       6.6       125       133        60
OIR    2025250     91400   18.2400 -112.8400       6.6       125       137        60
OIR    2025250     91400   18.2400 -112.8500       6.6       125       140        60
OIR    2025250     91400   18.2400 -112.8600       6.6       125       140        60
OIR    2025250     91400   18.2400 -112.8700       6.6       124       140        60
OIR    2025250     91400   18.2400 -112.8800       6.6       124       137        60
OIR    2025250     91400   18.2400 -112.8900       6.7       123       134        60
OIR    2025250     91400   18.2400 -112.9000       7.0       122       133        60
OIR    2025250     91400   18.2400 -112.9100       7.1       121       131        60
OIR    2025250     91400   18.2400 -112.9200       7.1       120       130        60
OIR    2025250     91400   18.2400 -112.9300       7.1       120       130        60
OIR    2025250     91400   18.2400 -112.9400       7.2       120       131        60
OIR    2025250     91400   18.2400 -112.9500       7.3       120       128        60
OIR    2025250     91400   18.2400 -112.9600       7.5       120       126        60
OIR    2025250     91400   18.2400 -112.9700       7.6       119       124        60
OIR    2025250     91400   18.2400 -112.9800       7.6       119       123        60
OIR    2025250     91400   18.2400 -112.9900       7.6       119       122        60
OIR    2025250     91400   18.2400 -113.0000       7.6       118       122        60
OIR    2025250     91400   18.2400 -113.0100       7.6       117       123        60
OIR    2025250     91400   18.2400 -113.0200       7.6       116       127        60
OIR    2025250     91400   18.2400 -113.0300       7.6       115       131        60
OIR    2025250     91400   18.2400 -113.0400       7.5       114       137        60
OIR    2025250     91400   18.2400 -113.0500       7.4       114       143        60
OIR    2025250     91400   18.2400 -113.0700       7.4       114       143        60
OIR    2025250     91400   18.2400 -113.0800       7.4       113       141        60
OIR    2025250     91400   18.2400 -113.0900       7.3       113       138        60
OIR    2025250     91400   18.2400 -113.1000       7.1       110       134        60
OIR    2025250     91400   18.2400 -113.1100       6.9       105       131        60
OIR    2025250     91400   18.2400 -113.1200       6.5        99       127        60
OIR    2025250     91400   18.2400 -113.1300       6.1        94       125        60
OIR    2025250     91400   18.2400 -113.1400       5.9        93       128        60
OIR    2025250     91400   18.2400 -113.1500       5.3        87       130        60
OIR    2025250     91400   18.2400 -113.1600       4.5        79       132        60
OIR    2025250     91400   18.2400 -113.1700       4.2        76       134        60
OIR    2025250     91400   18.2400 -113.1800       4.1        75       135        60
OIR    2025250     91400   18.2400 -113.1900       4.0        76       136        60
OIR    2025250     91400   18.2400 -113.2000       4.0        76       135        60
OIR    2025250     91400   18.2400 -113.2900       4.1        85       142        60
OIR    2025250     91400   18.2400 -113.3300       5.5        93       142        60
OIR    2025250     91400   18.2400 -113.3400       6.2        96       143        60
OIR    2025250     91400   18.2400 -113.7800       4.6       180       143        60
OIR    2025250     91400   18.2400 -113.7900       4.6       179       140        60
OIR    2025250     91400   18.2400 -113.8000       4.7       178       135        60
OIR    2025250     91400   18.2400 -113.8100       4.7       178       131        60
OIR    2025250     91400   18.2400 -113.8200       4.6       177       129        60
OIR    2025250     91400   18.2400 -113.8300       4.6       177       127        60
OIR    2025250     91400   18.2400 -113.8400       4.4       173       127        60
OIR    2025250     91400   18.2400 -113.8500       4.4       170       128        60
OIR    2025250     91400   18.2400 -113.8600       4.4       169       130        60
OIR    2025250     91400   18.2400 -113.8700       4.3       168       133        60
OIR    2025250     91400   18.2400 -113.8800       4.3       168       135        60
OIR    2025250     91400   18.2400 -113.8900       4.2       167       141        60
OIR    2025250     91400   18.2400 -114.3000       4.0       268       133        60
OIR    2025250     91400   18.2400 -118.1700      21.2        28       140        60
OIR    2025250     91400   18.2400 -118.1800      22.2        28       135        60
OIR    2025250     91400   18.2400 -118.1900      22.5        29       132        60
OIR    2025250     91400   18.2400 -118.2000      22.9        30       131        60
OIR    2025250     91400   18.2400 -118.2100      23.6        33       131        60
OIR    2025250     91400   18.2400 -118.2200      23.7        33       135        60
OIR    2025250     91400   18.2400 -118.2300      24.2        34       142        60
OIR    2025250     91400   18.2300 -108.7600      11.6        64       140        60
OIR    2025250     91400   18.2300 -108.7700      11.5        65       139        60
OIR    2025250     91400   18.2300 -108.7800      11.4        65       137        60
OIR    2025250     91400   18.2300 -108.7900      11.3        66       136        60
OIR    2025250     91400   18.2300 -108.8000      11.1        66       137        60
OIR    2025250     91400   18.2300 -108.8100      11.0        67       138        60
OIR    2025250     91400   18.2300 -108.8200      10.9        67       141        60
OIR    2025250     91400   18.2300 -108.8900      10.7        67       142        60
OIR    2025250     91400   18.2300 -108.9000      10.7        67       141        60
OIR    2025250     91400   18.2300 -108.9100      10.8        68       139        60
OIR    2025250     91400   18.2300 -108.9200      10.8        68       136        60
OIR    2025250     91400   18.2300 -108.9300      10.9        68       133        60
OIR    2025250     91400   18.2300 -108.9400      11.0        69       131        60
OIR    2025250     91400   18.2300 -108.9500      11.0        69       131        60
OIR    2025250     91400   18.2300 -108.9600      11.0        69       130        60
OIR    2025250     91400   18.2300 -108.9700      11.1        69       129        60
OIR    2025250     91400   18.2300 -108.9800      11.2        69       128        60
OIR    2025250     91400   18.2300 -108.9900      11.4        68       128        60
OIR    2025250     91400   18.2300 -109.0000      11.7        67       128        60
OIR    2025250     91400   18.2300 -109.0100      12.2        65       129        60
OIR    2025250     91400   18.2300 -109.0200      13.0        62       129        60
OIR    2025250     91400   18.2300 -109.0300      13.9        60       130        60
OIR    2025250     91400   18.2300 -109.0400      14.4        60       130        60
OIR    2025250     91400   18.2300 -109.0500      14.5        59       130        60
OIR    2025250     91400   18.2300 -109.0600      14.5        59       131        60
OIR    2025250     91400   18.2300 -109.0700      14.6        59       131        60
OIR    2025250     91400   18.2300 -109.0800      14.6        59       130        60
OIR    2025250     91400   18.2300 -109.0900      14.6        59       130        60
OIR    2025250     91400   18.2300 -109.1000      14.6        59       129        60
OIR    2025250     91400   18.2300 -109.1100      14.7        60       129        60
OIR    2025250     91400   18.2300 -109.1200      14.7        60       129        60
OIR    2025250     91400   18.2300 -109.1300      14.7        60       129        60
OIR    2025250     91400   18.2300 -109.1400      14.7        60       131        60
OIR    2025250     91400   18.2300 -109.1500      14.8        60       132        60
OIR    2025250     91400   18.2300 -109.1600      14.9        60       133        60
OIR    2025250     91400   18.2300 -109.1700      14.9        60       133        60
OIR    2025250     91400   18.2300 -109.1800      15.0        61       133        60
OIR    2025250     91400   18.2300 -109.1900      15.1        61       134        60
OIR    2025250     91400   18.2300 -109.2000      15.1        61       134        60
OIR    2025250     91400   18.2300 -109.2100      15.2        61       134        60
OIR    2025250     91400   18.2300 -109.2200      15.3        61       133        60
OIR    2025250     91400   18.2300 -109.2300      15.6        61       133        60
OIR    2025250     91400   18.2300 -109.2400      17.4        61       135        60
OIR    2025250     91400   18.2300 -109.2500      19.5        61       138        60
OIR    2025250     91400   18.2300 -109.2600      20.3        60       140        60
OIR    2025250     91400   18.2300 -109.2700      20.8        60       141        60
OIR    2025250     91400   18.2300 -111.1900      12.5        59       143        60
OIR    2025250     91400   18.2300 -111.2000      12.5        59       143        60
OIR    2025250     91400   18.2300 -111.2100      12.3        62       143        60
OIR    2025250     91400   18.2300 -111.2200      12.0        67       141        60
OIR    2025250     91400   18.2300 -111.2300      11.8        70       136        60
OIR    2025250     91400   18.2300 -111.2400      11.8        73       131        60
OIR    2025250     91400   18.2300 -111.2500      11.9        74       126        60
OIR    2025250     91400   18.2300 -111.2600      11.9        74       122        60
OIR    2025250     91400   18.2300 -111.2700      12.0        74       120        60
OIR    2025250     91400   18.2300 -111.2800      12.0        75       120        60
OIR    2025250     91400   18.2300 -111.2900      12.1        75       120        60
OIR    2025250     91400   18.2300 -111.3000      12.1        75       117        60
OIR    2025250     91400   18.2300 -111.3100      12.1        75       116        60
OIR    2025250     91400   18.2300 -111.3200      12.1        75       115        60
OIR    2025250     91400   18.2300 -111.3300      12.1        75       114        60
OIR    2025250     91400   18.2300 -111.3400      12.1        75       113        60
OIR    2025250     91400   18.2300 -111.3500      12.1        75       112        60
OIR    2025250     91400   18.2300 -111.3600      12.1        75       111        60
OIR    2025250     91400   18.2300 -111.3700      12.0        75       111        60
OIR    2025250     91400   18.2300 -111.3800      12.0        76       111        60
OIR    2025250     91400   18.2300 -111.3900      12.0        76       110        60
OIR    2025250     91400   18.2300 -111.4000      12.0        76       109        60
OIR    2025250     91400   18.2300 -111.4100      12.0        76       108        60
OIR    2025250     91400   18.2300 -111.4200      12.0        76       107        60
OIR    2025250     91400   18.2300 -111.4300      12.0        76       107        60
OIR    2025250     91400   18.2300 -111.4400      12.0        76       105        60
OIR    2025250     91400   18.2300 -111.4500      12.0        76       105        60
OIR    2025250     91400   18.2300 -111.4600      11.9        76       105        60
OIR    2025250     91400   18.2300 -111.4700      11.9        76       104        60
OIR    2025250     91400   18.2300 -111.4800      11.9        76       104        60
OIR    2025250     91400   18.2300 -111.4900      11.9        76       104        60
OIR    2025250     91400   18.2300 -111.5000      11.9        76       104        60
OIR    2025250     91400   18.2300 -111.5100      11.9        76       104        60
OIR    2025250     91400   18.2300 -111.5200      11.8        76       104        60
OIR    2025250     91400   18.2300 -111.5300      11.8        76       104        60
OIR    2025250     91400   18.2300 -111.5400      11.7        76       105        60
OIR    2025250     91400   18.2300 -111.5500      11.6        76       107        60
OIR    2025250     91400   18.2300 -111.5600      11.4        76       105        60
OIR    2025250     91400   18.2300 -111.5700      11.1        76       104        60
OIR    2025250     91400   18.2300 -111.5800      10.3        76       104        60
OIR    2025250     91400   18.2300 -111.5900       9.6        75       104        60
OIR    2025250     91400   18.2300 -111.6000       9.1        76       104        60
OIR    2025250     91400   18.2300 -111.6100       8.9        76       104        60
OIR    2025250     91400   18.2300 -111.6200       8.8        76       103        60
OIR    2025250     91400   18.2300 -111.6300       8.7        75       103        60
OIR    2025250     91400   18.2300 -111.6400       8.7        75       103        60
OIR    2025250     91400   18.2300 -111.6500       8.6        75       103        60
OIR    2025250     91400   18.2300 -111.6600       8.3        75       103        60
OIR    2025250     91400   18.2300 -111.6700       8.0        75       103        60
OIR    2025250     91400   18.2300 -111.6800       7.5        75       103        60
OIR    2025250     91400   18.2300 -111.6900       7.1        77       103        60
OIR    2025250     91400   18.2300 -111.7000       6.9        79       104        60
OIR    2025250     91400   18.2300 -111.7100       6.6        81       105        60
OIR    2025250     91400   18.2300 -111.7200       5.9        87       108        60
OIR    2025250     91400   18.2300 -111.7300       4.5       117       109        60
OIR    2025250     91400   18.2300 -111.7400       4.4       150       110        60
OIR    2025250     91400   18.2300 -111.7500       4.5       154       111        60
OIR    2025250     91400   18.2300 -111.7600       4.7       155       110        60
OIR    2025250     91400   18.2300 -111.7700       8.7       121       109        60
OIR    2025250     91400   18.2300 -111.7800       9.8       114       107        60
OIR    2025250     91400   18.2300 -111.7900      10.7       102       108        60
OIR    2025250     91400   18.2300 -111.8000      12.6        80       110        60
OIR    2025250     91400   18.2300 -111.8100      11.9        54       112        60
OIR    2025250     91400   18.2300 -111.8200      12.3        50       114        60
OIR    2025250     91400   18.2300 -111.8300      12.7        50       117        60
OIR    2025250     91400   18.2300 -111.8400      13.1        50       127        60
OIR    2025250     91400   18.2300 -111.8500      13.1        51       136        60
OIR    2025250     91400   18.2300 -111.8600      13.0        51       141        60
OIR    2025250     91400   18.2300 -112.1200      11.2        85       142        60
OIR    2025250     91400   18.2300 -112.1300      11.9        88       139        60
OIR    2025250     91400   18.2300 -112.1400      12.2        88       137        60
OIR    2025250     91400   18.2300 -112.1500      12.2        89       134        60
OIR    2025250     91400   18.2300 -112.1600      12.2        89       133        60
OIR    2025250     91400   18.2300 -112.1700      12.2        89       133        60
OIR    2025250     91400   18.2300 -112.1800      12.2        89       133        60
OIR    2025250     91400   18.2300 -112.1900      12.2        89       132        60
OIR    2025250     91400   18.2300 -112.2000      12.2        89       131        60
OIR    2025250     91400   18.2300 -112.2100      12.2        89       130        60
OIR    2025250     91400   18.2300 -112.2200      12.2        89       130        60
OIR    2025250     91400   18.2300 -112.2300      12.2        89       130        60
OIR    2025250     91400   18.2300 -112.2400      12.2        89       130        60
OIR    2025250     91400   18.2300 -112.2500      12.2        89       130        60
OIR    2025250     91400   18.2300 -112.2600      12.2        89       128        60
OIR    2025250     91400   18.2300 -112.2700      12.2        89       126        60
OIR    2025250     91400   18.2300 -112.2800      12.2        89       126        60
OIR    2025250     91400   18.2300 -112.2900      12.2        89       125        60
OIR    2025250     91400   18.2300 -112.3000      12.2        89       126        60
OIR    2025250     91400   18.2300 -112.3100      12.2        90       128        60
OIR    2025250     91400   18.2300 -112.3200      12.2        90       129        60
OIR    2025250     91400   18.2300 -112.3300      12.1        90       131        60
OIR    2025250     91400   18.2300 -112.3400      12.1        90       132        60
OIR    2025250     91400   18.2300 -112.3500      12.1        91       133        60
OIR    2025250     91400   18.2300 -112.3600      12.0        91       133        60
OIR    2025250     91400   18.2300 -112.3700      11.7        92       134        60
OIR    2025250     91400   18.2300 -112.3800      11.1        95       134        60
OIR    2025250     91400   18.2300 -112.3900      10.5        99       134        60
OIR    2025250     91400   18.2300 -112.4000      10.2       101       134        60
OIR    2025250     91400   18.2300 -112.4100       9.8       104       134        60
OIR    2025250     91400   18.2300 -112.4200       9.2       109       132        60
OIR    2025250     91400   18.2300 -112.4300       8.5       115       129        60
OIR    2025250     91400   18.2300 -112.4400       8.0       118       125        60
OIR    2025250     91400   18.2300 -112.4500       7.8       119       120        60
OIR    2025250     91400   18.2300 -112.4600       7.4       121       116        60
OIR    2025250     91400   18.2300 -112.4700       7.3       120       119        60
OIR    2025250     91400   18.2300 -112.4800       7.1       119       121        60
OIR    2025250     91400   18.2300 -112.4900       6.2       117       125        60
OIR    2025250     91400   18.2300 -112.5000       5.4       117       130        60
OIR    2025250     91400   18.2300 -112.5100       5.3       117       132        60
OIR    2025250     91400   18.2300 -112.5200       5.3       117       133        60
OIR    2025250     91400   18.2300 -112.5300       5.3       117       134        60
OIR    2025250     91400   18.2300 -112.5400       5.3       117       135        60
OIR    2025250     91400   18.2300 -112.5500       5.3       117       136        60
OIR    2025250     91400   18.2300 -112.5600       5.2       117       135        60
OIR    2025250     91400   18.2300 -112.5700       5.1       118       134        60
OIR    2025250     91400   18.2300 -112.5800       5.1       117       133        60
OIR    2025250     91400   18.2300 -112.5900       5.0       117       132        60
OIR    2025250     91400   18.2300 -112.6000       5.0       118       131        60
OIR    2025250     91400   18.2300 -112.6100       5.0       118       129        60
OIR    2025250     91400   18.2300 -112.6200       5.0       118       128        60
OIR    2025250     91400   18.2300 -112.6300       5.0       118       130        60
OIR    2025250     91400   18.2300 -112.6400       5.0       118       133        60
OIR    2025250     91400   18.2300 -112.6500       5.0       120       135        60
OIR    2025250     91400   18.2300 -112.6600       5.0       123       135        60
OIR    2025250     91400   18.2300 -112.6700       5.1       126       136        60
OIR    2025250     91400   18.2300 -112.6800       5.1       126       136        60
OIR    2025250     91400   18.2300 -112.6900       5.1       127       136        60
OIR    2025250     91400   18.2300 -112.7000       5.1       127       139        60
OIR    2025250     91400   18.2300 -112.7100       5.1       127       143        60
OIR    2025250     91400   18.2300 -112.7200       5.1       127       143        60
OIR    2025250     91400   18.2300 -112.7300       5.2       127       142        60
OIR    2025250     91400   18.2300 -112.7400       5.2       127       142        60
OIR    2025250     91400   18.2300 -112.7500       5.3       127       141        60
OIR    2025250     91400   18.2300 -112.7600       5.4       126       141        60
OIR    2025250     91400   18.2300 -112.7700       5.6       127       139        60
OIR    2025250     91400   18.2300 -112.7800       6.0       127       137        60
OIR    2025250     91400   18.2300 -112.7900       6.5       125       135        60
OIR    2025250     91400   18.2300 -112.8000       6.6       125       134        60
OIR    2025250     91400   18.2300 -112.8100       6.6       125       133        60
OIR    2025250     91400   18.2300 -112.8200       6.6       125       133        60
OIR    2025250     91400   18.2300 -112.8300       6.6       125       133        60
OIR    2025250     91400   18.2300 -112.8400       6.6       125       136        60
OIR    2025250     91400   18.2300 -112.8500       6.6       125       140        60
OIR    2025250     91400   18.2300 -112.8600       6.5       125       140        60
OIR    2025250     91400   18.2300 -112.8700       6.5       125       140        60
OIR    2025250     91400   18.2300 -112.8800       6.5       125       138        60
OIR    2025250     91400   18.2300 -112.8900       6.6       124       134        60
OIR    2025250     91400   18.2300 -112.9000       6.8       123       131        60
OIR    2025250     91400   18.2300 -112.9100       7.0       121       130        60
OIR    2025250     91400   18.2300 -112.9200       7.0       121       130        60
OIR    2025250     91400   18.2300 -112.9300       7.1       120       131        60
OIR    2025250     91400   18.2300 -112.9400       7.1       120       132        60
OIR    2025250     91400   18.2300 -112.9500       7.3       120       132        60
OIR    2025250     91400   18.2300 -112.9600       7.5       120       129        60
OIR    2025250     91400   18.2300 -112.9700       7.6       120       127        60
OIR    2025250     91400   18.2300 -112.9800       7.6       119       125        60
OIR    2025250     91400   18.2300 -112.9900       7.6       119       124        60
OIR    2025250     91400   18.2300 -113.0000       7.6       118       126        60
OIR    2025250     91400   18.2300 -113.0100       7.6       117       128        60
OIR    2025250     91400   18.2300 -113.0200       7.7       116       131        60
OIR    2025250     91400   18.2300 -113.0300       7.5       115       135        60
OIR    2025250     91400   18.2300 -113.0400       7.4       114       140        60
OIR    2025250     91400   18.2300 -113.0800       7.2       112       143        60
OIR    2025250     91400   18.2300 -113.0900       6.8       108       136        60
OIR    2025250     91400   18.2300 -113.1000       6.5       103       128        60
OIR    2025250     91400   18.2300 -113.1100       6.0        96       126        60
OIR    2025250     91400   18.2300 -113.1200       5.6        88       126        60
OIR    2025250     91400   18.2300 -113.1300       5.4        82       126        60
OIR    2025250     91400   18.2300 -113.1400       5.0        79       131        60
OIR    2025250     91400   18.2300 -113.1500       4.6        76       136        60
OIR    2025250     91400   18.2300 -113.1600       4.3        74       139        60
OIR    2025250     91400   18.2300 -113.1700       4.1        74       142        60
OIR    2025250     91400   18.2300 -113.1800       4.1        75       141        60
OIR    2025250     91400   18.2300 -113.1900       4.0        75       139        60
OIR    2025250     91400   18.2300 -113.2900       4.0        82       142        60
OIR    2025250     91400   18.2300 -113.3200       5.2        89       142        60
OIR    2025250     91400   18.2300 -113.3300       6.0        94       138        60
OIR    2025250     91400   18.2300 -113.3400       6.3        97       140        60
OIR    2025250     91400   18.2300 -113.7800       4.7       180       141        60
OIR    2025250     91400   18.2300 -113.7900       4.7       178       136        60
OIR    2025250     91400   18.2300 -113.8000       4.7       178       134        60
OIR    2025250     91400   18.2300 -113.8100       4.7       178       131        60
OIR    2025250     91400   18.2300 -113.8200       4.6       177       129        60
OIR    2025250     91400   18.2300 -113.8300       4.6       177       128        60
OIR    2025250     91400   18.2300 -113.8400       4.4       174       126        60
OIR    2025250     91400   18.2300 -113.8500       4.4       171       128        60
OIR    2025250     91400   18.2300 -113.8600       4.4       169       129        60
OIR    2025250     91400   18.2300 -113.8700       4.4       169       134        60
OIR    2025250     91400   18.2300 -113.8800       4.3       168       138        60
OIR    2025250     91400   18.2300 -113.8900       4.3       169       142        60
OIR    2025250     91400   18.2300 -118.1800      21.7        27       143        60
OIR    2025250     91400   18.2300 -118.1900      21.5        28       139        60
OIR    2025250     91400   18.2300 -118.2000      21.1        29       136        60
OIR    2025250     91400   18.2300 -118.2100      23.2        32       137        60
OIR    2025250     91400   18.2300 -118.2200      23.6        33       138        60
OIR    2025250     91400   18.2300 -118.2300      24.1        35       144        60
OIR    2025250     91400   18.2200 -108.7500      11.3        63       142        60
OIR    2025250     91400   18.2200 -108.7600      11.2        64       139        60
OIR    2025250     91400   18.2200 -108.7700      11.2        65       138        60
OIR    2025250     91400   18.2200 -108.7800      11.2        65       136        60
OIR    2025250     91400   18.2200 -108.7900      11.1        65       135        60
OIR    2025250     91400   18.2200 -108.8000      11.1        65       136        60
OIR    2025250     91400   18.2200 -108.8100      11.1        65       138        60
OIR    2025250     91400   18.2200 -108.8200      11.0        66       140        60
OIR    2025250     91400   18.2200 -108.9100      10.8        68       142        60
OIR    2025250     91400   18.2200 -108.9200      10.8        68       139        60
OIR    2025250     91400   18.2200 -108.9300      10.9        68       135        60
OIR    2025250     91400   18.2200 -108.9400      11.0        69       132        60
OIR    2025250     91400   18.2200 -108.9500      11.0        69       132        60
OIR    2025250     91400   18.2200 -108.9600      11.0        69       133        60
OIR    2025250     91400   18.2200 -108.9700      11.0        69       131        60
OIR    2025250     91400   18.2200 -108.9800      11.0        69       129        60
OIR    2025250     91400   18.2200 -108.9900      11.1        69       129        60
OIR    2025250     91400   18.2200 -109.0000      11.1        69       130        60
OIR    2025250     91400   18.2200 -109.0100      11.3        68       132        60
OIR    2025250     91400   18.2200 -109.0200      11.7        66       131        60
OIR    2025250     91400   18.2200 -109.0300      12.6        63       131        60
OIR    2025250     91400   18.2200 -109.0400      13.7        61       131        60
OIR    2025250     91400   18.2200 -109.0500      14.3        60       131        60
OIR    2025250     91400   18.2200 -109.0600      14.4        60       131        60
OIR    2025250     91400   18.2200 -109.0700      14.5        59       130        60
OIR    2025250     91400   18.2200 -109.0800      14.5        59       130        60
OIR    2025250     91400   18.2200 -109.0900      14.6        59       130        60
OIR    2025250     91400   18.2200 -109.1000      14.6        60       131        60
OIR    2025250     91400   18.2200 -109.1100      14.6        60       131        60
OIR    2025250     91400   18.2200 -109.1200      14.7        60       132        60
OIR    2025250     91400   18.2200 -109.1300      14.7        60       132        60
OIR    2025250     91400   18.2200 -109.1400      14.7        60       133        60
OIR    2025250     91400   18.2200 -109.1500      14.8        60       134        60
OIR    2025250     91400   18.2200 -109.1600      14.9        60       135        60
OIR    2025250     91400   18.2200 -109.1700      14.9        61       134        60
OIR    2025250     91400   18.2200 -109.1800      15.0        61       134        60
OIR    2025250     91400   18.2200 -109.1900      15.0        61       135        60
OIR    2025250     91400   18.2200 -109.2000      15.1        61       137        60
OIR    2025250     91400   18.2200 -109.2100      15.2        61       139        60
OIR    2025250     91400   18.2200 -109.2200      15.3        61       140        60
OIR    2025250     91400   18.2200 -109.2300      15.5        62       141        60
OIR    2025250     91400   18.2200 -109.2400      16.8        62       141        60
OIR    2025250     91400   18.2200 -109.2500      19.1        62       141        60
OIR    2025250     91400   18.2200 -110.9400      16.8        56       144        60
OIR    2025250     91400   18.2200 -111.2000      12.3        60       143        60
OIR    2025250     91400   18.2200 -111.2100      12.1        63       141        60
OIR    2025250     91400   18.2200 -111.2200      11.7        70       139        60
OIR    2025250     91400   18.2200 -111.2300      11.6        73       135        60
OIR    2025250     91400   18.2200 -111.2400      11.7        74       131        60
OIR    2025250     91400   18.2200 -111.2500      11.8        74       127        60
OIR    2025250     91400   18.2200 -111.2600      11.8        74       124        60
OIR    2025250     91400   18.2200 -111.2700      11.9        75       121        60
OIR    2025250     91400   18.2200 -111.2800      11.9        75       119        60
OIR    2025250     91400   18.2200 -111.2900      12.0        75       117        60
OIR    2025250     91400   18.2200 -111.3000      12.0        75       116        60
OIR    2025250     91400   18.2200 -111.3100      12.1        75       115        60
OIR    2025250     91400   18.2200 -111.3200      12.1        75       114        60
OIR    2025250     91400   18.2200 -111.3300      12.1        75       113        60
OIR    2025250     91400   18.2200 -111.3400      12.1        75       113        60
OIR    2025250     91400   18.2200 -111.3500      12.1        75       112        60
OIR    2025250     91400   18.2200 -111.3600      12.1        75       111        60
OIR    2025250     91400   18.2200 -111.3700      12.0        75       110        60
OIR    2025250     91400   18.2200 -111.3800      12.0        76       110        60
OIR    2025250     91400   18.2200 -111.3900      12.0        76       109        60
OIR    2025250     91400   18.2200 -111.4000      12.0        76       108        60
OIR    2025250     91400   18.2200 -111.4100      12.0        76       105        60
OIR    2025250     91400   18.2200 -111.4200      12.0        76       105        60
OIR    2025250     91400   18.2200 -111.4300      12.0        76       104        60
OIR    2025250     91400   18.2200 -111.4400      12.0        76       105        60
OIR    2025250     91400   18.2200 -111.4500      11.9        76       105        60
OIR    2025250     91400   18.2200 -111.4600      11.9        76       107        60
OIR    2025250     91400   18.2200 -111.4700      11.9        76       107        60
OIR    2025250     91400   18.2200 -111.4800      11.9        76       107        60
OIR    2025250     91400   18.2200 -111.4900      11.9        76       104        60
OIR    2025250     91400   18.2200 -111.5000      11.9        76       104        60
OIR    2025250     91400   18.2200 -111.5100      11.8        77       104        60
OIR    2025250     91400   18.2200 -111.5200      11.8        77       105        60
OIR    2025250     91400   18.2200 -111.5300      11.7        77       107        60
OIR    2025250     91400   18.2200 -111.5400      11.7        77       109        60
OIR    2025250     91400   18.2200 -111.5500      11.6        77       110        60
OIR    2025250     91400   18.2200 -111.5600      11.4        77       109        60
OIR    2025250     91400   18.2200 -111.5700      11.1        77       108        60
OIR    2025250     91400   18.2200 -111.5800      10.1        76       108        60
OIR    2025250     91400   18.2200 -111.5900       9.6        76       107        60
OIR    2025250     91400   18.2200 -111.6000       9.1        76       105        60
OIR    2025250     91400   18.2200 -111.6100       8.9        75       104        60
OIR    2025250     91400   18.2200 -111.6200       8.8        75       104        60
OIR    2025250     91400   18.2200 -111.6300       8.8        75       104        60
OIR    2025250     91400   18.2200 -111.6400       8.7        75       103        60
OIR    2025250     91400   18.2200 -111.6500       8.6        74       103        60
OIR    2025250     91400   18.2200 -111.6600       8.4        74       103        60
OIR    2025250     91400   18.2200 -111.6700       8.3        74       103        60
OIR    2025250     91400   18.2200 -111.6800       8.1        74       103        60
OIR    2025250     91400   18.2200 -111.6900       7.8        74       103        60
OIR    2025250     91400   18.2200 -111.7000       7.3        76       104        60
OIR    2025250     91400   18.2200 -111.7100       7.1        79       105        60
OIR    2025250     91400   18.2200 -111.7200       6.7        84       108        60
OIR    2025250     91400   18.2200 -111.7300       5.0       107       110        60
OIR    2025250     91400   18.2200 -111.7400       4.7       153       112        60
OIR    2025250     91400   18.2200 -111.7500       4.9       158       114        60
OIR    2025250     91400   18.2200 -111.7600       5.2       160       115        60
OIR    2025250     91400   18.2200 -111.7700       7.5       130       113        60
OIR    2025250     91400   18.2200 -111.7800       8.7       114       112        60
OIR    2025250     91400   18.2200 -111.7900       9.8       100       111        60
OIR    2025250     91400   18.2200 -111.8000      12.0        72       112        60
OIR    2025250     91400   18.2200 -111.8100      12.5        53       113        60
OIR    2025250     91400   18.2200 -111.8200      12.6        49       116        60
OIR    2025250     91400   18.2200 -111.8300      12.6        48       117        60
OIR    2025250     91400   18.2200 -111.8400      12.7        49       124        60
OIR    2025250     91400   18.2200 -111.8500      13.0        50       131        60
OIR    2025250     91400   18.2200 -111.8600      12.9        51       136        60
OIR    2025250     91400   18.2200 -111.8700      12.5        51       139        60
OIR    2025250     91400   18.2200 -111.8800      11.6        52       142        60
OIR    2025250     91400   18.2200 -112.0800       9.7        77       141        60
OIR    2025250     91400   18.2200 -112.0900       9.7        77       139        60
OIR    2025250     91400   18.2200 -112.1000       9.8        77       138        60
OIR    2025250     91400   18.2200 -112.1100      10.0        79       137        60
OIR    2025250     91400   18.2200 -112.1200      10.8        83       135        60
OIR    2025250     91400   18.2200 -112.1300      11.8        87       133        60
OIR    2025250     91400   18.2200 -112.1400      12.2        88       131        60
OIR    2025250     91400   18.2200 -112.1500      12.2        89       129        60
OIR    2025250     91400   18.2200 -112.1600      12.2        89       128        60
OIR    2025250     91400   18.2200 -112.1700      12.2        89       129        60
OIR    2025250     91400   18.2200 -112.1800      12.2        89       130        60
OIR    2025250     91400   18.2200 -112.1900      12.2        89       129        60
OIR    2025250     91400   18.2200 -112.2000      12.2        89       128        60
OIR    2025250     91400   18.2200 -112.2100      12.2        89       128        60
OIR    2025250     91400   18.2200 -112.2200      12.2        89       127        60
OIR    2025250     91400   18.2200 -112.2300      12.3        89       126        60
OIR    2025250     91400   18.2200 -112.2400      12.3        89       126        60
OIR    2025250     91400   18.2200 -112.2500      12.3        89       126        60
OIR    2025250     91400   18.2200 -112.2600      12.2        89       125        60
OIR    2025250     91400   18.2200 -112.2700      12.2        89       125        60
OIR    2025250     91400   18.2200 -112.2800      12.2        89       125        60
OIR    2025250     91400   18.2200 -112.2900      12.2        89       126        60
OIR    2025250     91400   18.2200 -112.3000      12.2        89       127        60
OIR    2025250     91400   18.2200 -112.3100      12.2        89       129        60
OIR    2025250     91400   18.2200 -112.3200      12.2        90       131        60
OIR    2025250     91400   18.2200 -112.3300      12.1        90       131        60
OIR    2025250     91400   18.2200 -112.3400      12.1        90       131        60
OIR    2025250     91400   18.2200 -112.3500      12.1        91       132        60
OIR    2025250     91400   18.2200 -112.3600      12.0        91       132        60
OIR    2025250     91400   18.2200 -112.3700      11.6        93       133        60
OIR    2025250     91400   18.2200 -112.3800      10.9        97       134        60
OIR    2025250     91400   18.2200 -112.3900      10.5       100       134        60
OIR    2025250     91400   18.2200 -112.4000      10.4       101       135        60
OIR    2025250     91400   18.2200 -112.4100      10.2       103       135        60
OIR    2025250     91400   18.2200 -112.4200      10.0       105       134        60
OIR    2025250     91400   18.2200 -112.4300       9.6       110       132        60
OIR    2025250     91400   18.2200 -112.4400       8.3       117       129        60
OIR    2025250     91400   18.2200 -112.4500       8.2       117       124        60
OIR    2025250     91400   18.2200 -112.4600       7.5       121       120        60
OIR    2025250     91400   18.2200 -112.4700       7.4       120       121        60
OIR    2025250     91400   18.2200 -112.4800       7.3       120       122        60
OIR    2025250     91400   18.2200 -112.4900       6.9       118       124        60
OIR    2025250     91400   18.2200 -112.5000       5.4       118       129        60
OIR    2025250     91400   18.2200 -112.5100       5.4       118       131        60
OIR    2025250     91400   18.2200 -112.5200       5.3       117       132        60
OIR    2025250     91400   18.2200 -112.5300       5.3       117       132        60
OIR    2025250     91400   18.2200 -112.5400       5.3       117       134        60
OIR    2025250     91400   18.2200 -112.5500       5.3       118       135        60
OIR    2025250     91400   18.2200 -112.5600       5.2       118       135        60
OIR    2025250     91400   18.2200 -112.5700       5.1       118       134        60
OIR    2025250     91400   18.2200 -112.5800       5.1       118       133        60
OIR    2025250     91400   18.2200 -112.5900       5.0       118       132        60
OIR    2025250     91400   18.2200 -112.6000       5.0       118       130        60
OIR    2025250     91400   18.2200 -112.6100       5.0       118       128        60
OIR    2025250     91400   18.2200 -112.6200       5.0       118       126        60
OIR    2025250     91400   18.2200 -112.6300       5.0       119       128        60
OIR    2025250     91400   18.2200 -112.6400       5.0       119       129        60
OIR    2025250     91400   18.2200 -112.6500       5.0       120       131        60
OIR    2025250     91400   18.2200 -112.6600       4.9       124       132        60
OIR    2025250     91400   18.2200 -112.6700       5.0       126       133        60
OIR    2025250     91400   18.2200 -112.6800       5.0       127       134        60
OIR    2025250     91400   18.2200 -112.6900       5.0       128       134        60
OIR    2025250     91400   18.2200 -112.7000       5.0       128       138        60
OIR    2025250     91400   18.2200 -112.7100       5.1       128       142        60
OIR    2025250     91400   18.2200 -112.7200       5.1       128       143        60
OIR    2025250     91400   18.2200 -112.7300       5.1       128       141        60
OIR    2025250     91400   18.2200 -112.7400       5.1       128       140        60
OIR    2025250     91400   18.2200 -112.7500       5.2       127       140        60
OIR    2025250     91400   18.2200 -112.7600       5.3       128       140        60
OIR    2025250     91400   18.2200 -112.7700       5.5       128       140        60
OIR    2025250     91400   18.2200 -112.7800       5.9       128       141        60
OIR    2025250     91400   18.2200 -112.7900       6.4       126       139        60
OIR    2025250     91400   18.2200 -112.8000       6.5       125       137        60
OIR    2025250     91400   18.2200 -112.8100       6.5       125       136        60
OIR    2025250     91400   18.2200 -112.8200       6.5       125       135        60
OIR    2025250     91400   18.2200 -112.8300       6.5       125       134        60
OIR    2025250     91400   18.2200 -112.8400       6.5       125       136        60
OIR    2025250     91400   18.2200 -112.8500       6.5       125       138        60
OIR    2025250     91400   18.2200 -112.8600       6.5       125       139        60
OIR    2025250     91400   18.2200 -112.8700       6.5       125       139        60
OIR    2025250     91400   18.2200 -112.8800       6.5       125       137        60
OIR    2025250     91400   18.2200 -112.8900       6.5       125       133        60
OIR    2025250     91400   18.2200 -112.9000       6.6       124       129        60
OIR    2025250     91400   18.2200 -112.9100       6.9       122       129        60
OIR    2025250     91400   18.2200 -112.9200       6.9       121       129        60
OIR    2025250     91400   18.2200 -112.9300       7.0       120       131        60
OIR    2025250     91400   18.2200 -112.9400       7.0       120       134        60
OIR    2025250     91400   18.2200 -112.9500       7.2       119       136        60
OIR    2025250     91400   18.2200 -112.9600       7.4       120       134        60
OIR    2025250     91400   18.2200 -112.9700       7.5       120       133        60
OIR    2025250     91400   18.2200 -112.9800       7.6       119       130        60
OIR    2025250     91400   18.2200 -112.9900       7.6       119       128        60
OIR    2025250     91400   18.2200 -113.0000       7.6       119       131        60
OIR    2025250     91400   18.2200 -113.0100       7.7       118       134        60
OIR    2025250     91400   18.2200 -113.0200       7.7       116       138        60
OIR    2025250     91400   18.2200 -113.0300       7.4       114       143        60
OIR    2025250     91400   18.2200 -113.0900       6.4       101       142        60
OIR    2025250     91400   18.2200 -113.1000       5.9        93       136        60
OIR    2025250     91400   18.2200 -113.1100       5.4        87       132        60
OIR    2025250     91400   18.2200 -113.1200       5.1        79       131        60
OIR    2025250     91400   18.2200 -113.1300       5.0        75       131        60
OIR    2025250     91400   18.2200 -113.1400       4.8        73       135        60
OIR    2025250     91400   18.2200 -113.1500       4.5        72       140        60
OIR    2025250     91400   18.2200 -113.1600       4.3        72       143        60
OIR    2025250     91400   18.2200 -113.1700       4.1        73       144        60
OIR    2025250     91400   18.2200 -113.1800       4.0        74       144        60
OIR    2025250     91400   18.2200 -113.1900       4.0        74       142        60
OIR    2025250     91400   18.2200 -113.3000       4.1        81       143        60
OIR    2025250     91400   18.2200 -113.3100       4.5        84       142        60
OIR    2025250     91400   18.2200 -113.3200       5.5        91       140        60
OIR    2025250     91400   18.2200 -113.3300       6.2        96       136        60
OIR    2025250     91400   18.2200 -113.3400       6.3        97       137        60
OIR    2025250     91400   18.2200 -113.3500       6.3        97       141        60
OIR    2025250     91400   18.2200 -113.7600       4.8       180       143        60
OIR    2025250     91400   18.2200 -113.7700       4.8       180       139        60
OIR    2025250     91400   18.2200 -113.7800       4.8       179       136        60
OIR    2025250     91400   18.2200 -113.7900       4.7       178       134        60
OIR    2025250     91400   18.2200 -113.8000       4.7       178       133        60
OIR    2025250     91400   18.2200 -113.8100       4.7       177       132        60
OIR    2025250     91400   18.2200 -113.8200       4.7       177       131        60
OIR    2025250     91400   18.2200 -113.8300       4.6       177       131        60
OIR    2025250     91400   18.2200 -113.8400       4.5       174       131        60
OIR    2025250     91400   18.2200 -113.8500       4.5       171       133        60
OIR    2025250     91400   18.2200 -113.8600       4.5       170       135        60
OIR    2025250     91400   18.2200 -113.8700       4.5       168       138        60
OIR    2025250     91400   18.2200 -113.8800       4.5       168       141        60
OIR    2025250     91400   18.2200 -114.3300       4.0       288       140        60
OIR    2025250     91400   18.2200 -114.3400       4.1       288       143        60
OIR    2025250     91400   18.2200 -114.3500       4.2       288       144        60
OIR    2025250     91400   18.2200 -118.2000      18.7        16       145        60
OIR    2025250     91400   18.2100 -108.7600      11.0        64       139        60
OIR    2025250     91400   18.2100 -108.7700      11.0        64       137        60
OIR    2025250     91400   18.2100 -108.7800      11.0        64       137        60
OIR    2025250     91400   18.2100 -108.7900      11.0        65       136        60
OIR    2025250     91400   18.2100 -108.8000      11.0        65       137        60
OIR    2025250     91400   18.2100 -108.8100      11.0        65       138        60
OIR    2025250     91400   18.2100 -108.8200      11.0        65       139        60
OIR    2025250     91400   18.2100 -108.8300      10.9        66       141        60
OIR    2025250     91400   18.2100 -108.9200      10.8        68       141        60
OIR    2025250     91400   18.2100 -108.9300      10.9        69       138        60
OIR    2025250     91400   18.2100 -108.9400      11.0        69       135        60
OIR    2025250     91400   18.2100 -108.9500      11.0        69       135        60
OIR    2025250     91400   18.2100 -108.9600      11.0        69       135        60
OIR    2025250     91400   18.2100 -108.9700      11.0        69       134        60
OIR    2025250     91400   18.2100 -108.9800      11.0        69       134        60
OIR    2025250     91400   18.2100 -108.9900      11.0        69       133        60
OIR    2025250     91400   18.2100 -109.0000      11.0        69       134        60
OIR    2025250     91400   18.2100 -109.0100      11.1        69       135        60
OIR    2025250     91400   18.2100 -109.0200      11.2        68       134        60
OIR    2025250     91400   18.2100 -109.0300      11.6        66       133        60
OIR    2025250     91400   18.2100 -109.0400      12.5        63       132        60
OIR    2025250     91400   18.2100 -109.0500      13.5        61       132        60
OIR    2025250     91400   18.2100 -109.0600      14.1        60       131        60
OIR    2025250     91400   18.2100 -109.0700      14.3        60       131        60
OIR    2025250     91400   18.2100 -109.0800      14.4        60       130        60
OIR    2025250     91400   18.2100 -109.0900      14.5        59       130        60
OIR    2025250     91400   18.2100 -109.1000      14.6        60       132        60
OIR    2025250     91400   18.2100 -109.1100      14.6        60       133        60
OIR    2025250     91400   18.2100 -109.1200      14.6        60       134        60
OIR    2025250     91400   18.2100 -109.1300      14.6        60       134        60
OIR    2025250     91400   18.2100 -109.1400      14.7        60       135        60
OIR    2025250     91400   18.2100 -109.1500      14.8        60       136        60
OIR    2025250     91400   18.2100 -109.1600      14.8        61       137        60
OIR    2025250     91400   18.2100 -109.1700      14.9        61       136        60
OIR    2025250     91400   18.2100 -109.1800      15.0        61       136        60
OIR    2025250     91400   18.2100 -109.1900      15.0        61       137        60
OIR    2025250     91400   18.2100 -109.2000      15.1        61       139        60
OIR    2025250     91400   18.2100 -109.2100      15.2        62       142        60
OIR    2025250     91400   18.2100 -110.9200      16.8        56       144        60
OIR    2025250     91400   18.2100 -110.9300      16.8        56       143        60
OIR    2025250     91400   18.2100 -110.9400      16.8        56       143        60
OIR    2025250     91400   18.2100 -110.9500      16.8        56       142        60
OIR    2025250     91400   18.2100 -110.9600      16.8        56       141        60
OIR    2025250     91400   18.2100 -110.9700      16.9        56       143        60
OIR    2025250     91400   18.2100 -111.2100      11.5        68       141        60
OIR    2025250     91400   18.2100 -111.2200      11.5        73       135        60
OIR    2025250     91400   18.2100 -111.2300      11.5        74       132        60
OIR    2025250     91400   18.2100 -111.2400      11.6        74       130        60
OIR    2025250     91400   18.2100 -111.2500      11.7        74       128        60
OIR    2025250     91400   18.2100 -111.2600      11.7        75       127        60
OIR    2025250     91400   18.2100 -111.2700      11.8        75       126        60
OIR    2025250     91400   18.2100 -111.2800      11.9        75       122        60
OIR    2025250     91400   18.2100 -111.2900      11.9        75       117        60
OIR    2025250     91400   18.2100 -111.3000      12.0        75       116        60
OIR    2025250     91400   18.2100 -111.3100      12.0        75       114        60
OIR    2025250     91400   18.2100 -111.3200      12.1        75       113        60
OIR    2025250     91400   18.2100 -111.3300      12.1        75       112        60
OIR    2025250     91400   18.2100 -111.3400      12.1        75       112        60
OIR    2025250     91400   18.2100 -111.3500      12.1        75       112        60
OIR    2025250     91400   18.2100 -111.3600      12.1        75       112        60
OIR    2025250     91400   18.2100 -111.3700      12.1        75       111        60
OIR    2025250     91400   18.2100 -111.3800      12.0        76       110        60
OIR    2025250     91400   18.2100 -111.3900      12.0        76       109        60
OIR    2025250     91400   18.2100 -111.4000      12.0        76       109        60
OIR    2025250     91400   18.2100 -111.4100      12.0        76       110        60
OIR    2025250     91400   18.2100 -111.4200      12.0        76       109        60
OIR    2025250     91400   18.2100 -111.4300      12.0        76       109        60
OIR    2025250     91400   18.2100 -111.4400      12.0        76       109        60
OIR    2025250     91400   18.2100 -111.4500      11.9        76       109        60
OIR    2025250     91400   18.2100 -111.4600      11.9        76       109        60
OIR    2025250     91400   18.2100 -111.4700      11.9        76       109        60
OIR    2025250     91400   18.2100 -111.4800      11.9        76       109        60
OIR    2025250     91400   18.2100 -111.4900      11.9        76       108        60
OIR    2025250     91400   18.2100 -111.5000      11.9        77       107        60
OIR    2025250     91400   18.2100 -111.5100      11.8        77       107        60
OIR    2025250     91400   18.2100 -111.5200      11.8        77       108        60
OIR    2025250     91400   18.2100 -111.5300      11.7        77       109        60
OIR    2025250     91400   18.2100 -111.5400      11.7        77       109        60
OIR    2025250     91400   18.2100 -111.5500      11.6        77       110        60
OIR    2025250     91400   18.2100 -111.5600      11.4        77       110        60
OIR    2025250     91400   18.2100 -111.5700      11.2        77       110        60
OIR    2025250     91400   18.2100 -111.5800      10.1        76       109        60
OIR    2025250     91400   18.2100 -111.5900       9.6        75       108        60
OIR    2025250     91400   18.2100 -111.6000       9.2        75       107        60
OIR    2025250     91400   18.2100 -111.6100       9.0        75       104        60
OIR    2025250     91400   18.2100 -111.6200       8.9        75       104        60
OIR    2025250     91400   18.2100 -111.6300       8.8        75       104        60
OIR    2025250     91400   18.2100 -111.6400       8.7        74       103        60
OIR    2025250     91400   18.2100 -111.6500       8.6        74       103        60
OIR    2025250     91400   18.2100 -111.6600       8.5        73       103        60
OIR    2025250     91400   18.2100 -111.6700       8.4        73       103        60
OIR    2025250     91400   18.2100 -111.6800       8.2        73       103        60
OIR    2025250     91400   18.2100 -111.6900       8.0        73       103        60
OIR    2025250     91400   18.2100 -111.7000       7.8        75       104        60
OIR    2025250     91400   18.2100 -111.7100       7.5        77       104        60
OIR    2025250     91400   18.2100 -111.7200       7.0        82       107        60
OIR    2025250     91400   18.2100 -111.7300       5.4       101       110        60
OIR    2025250     91400   18.2100 -111.7400       4.9       155       113        60
OIR    2025250     91400   18.2100 -111.7500       5.2       162       116        60
OIR    2025250     91400   18.2100 -111.7600       5.5       163       120        60
OIR    2025250     91400   18.2100 -111.7700       6.3       149       117        60
OIR    2025250     91400   18.2100 -111.7800       7.4       121       116        60
OIR    2025250     91400   18.2100 -111.7900       8.4        98       115        60
OIR    2025250     91400   18.2100 -111.8000       9.9        70       115        60
OIR    2025250     91400   18.2100 -111.8100      10.3        57       115        60
OIR    2025250     91400   18.2100 -111.8200      12.0        48       116        60
OIR    2025250     91400   18.2100 -111.8300      12.2        47       120        60
OIR    2025250     91400   18.2100 -111.8400      12.3        49       123        60
OIR    2025250     91400   18.2100 -111.8500      12.6        51       127        60
OIR    2025250     91400   18.2100 -111.8600      12.6        51       132        60
OIR    2025250     91400   18.2100 -111.8700      12.0        50       135        60
OIR    2025250     91400   18.2100 -111.8800      11.2        51       138        60
OIR    2025250     91400   18.2100 -111.8900      10.6        53       141        60
OIR    2025250     91400   18.2100 -112.0500       9.7        77       142        60
OIR    2025250     91400   18.2100 -112.0600       9.7        77       140        60
OIR    2025250     91400   18.2100 -112.0700       9.7        77       138        60
OIR    2025250     91400   18.2100 -112.0800       9.7        77       136        60
OIR    2025250     91400   18.2100 -112.0900       9.7        77       134        60
OIR    2025250     91400   18.2100 -112.1000       9.8        78       132        60
OIR    2025250     91400   18.2100 -112.1100       9.9        79       130        60
OIR    2025250     91400   18.2100 -112.1200      10.5        82       127        60
OIR    2025250     91400   18.2100 -112.1300      11.8        87       125        60
OIR    2025250     91400   18.2100 -112.1400      12.2        88       122        60
OIR    2025250     91400   18.2100 -112.1500      12.2        89       122        60
OIR    2025250     91400   18.2100 -112.1600      12.2        89       122        60
OIR    2025250     91400   18.2100 -112.1700      12.2        89       123        60
OIR    2025250     91400   18.2100 -112.1800      12.2        89       125        60
OIR    2025250     91400   18.2100 -112.1900      12.2        89       126        60
OIR    2025250     91400   18.2100 -112.2000      12.2        89       126        60
OIR    2025250     91400   18.2100 -112.2100      12.2        89       126        60
OIR    2025250     91400   18.2100 -112.2200      12.3        89       125        60
OIR    2025250     91400   18.2100 -112.2300      12.3        89       124        60
OIR    2025250     91400   18.2100 -112.2400      12.3        89       124        60
OIR    2025250     91400   18.2100 -112.2500      12.3        89       124        60
OIR    2025250     91400   18.2100 -112.2600      12.3        89       124        60
OIR    2025250     91400   18.2100 -112.2700      12.3        89       124        60
OIR    2025250     91400   18.2100 -112.2800      12.2        89       124        60
OIR    2025250     91400   18.2100 -112.2900      12.2        89       126        60
OIR    2025250     91400   18.2100 -112.3000      12.2        89       127        60
OIR    2025250     91400   18.2100 -112.3100      12.2        89       129        60
OIR    2025250     91400   18.2100 -112.3200      12.2        90       132        60
OIR    2025250     91400   18.2100 -112.3300      12.1        90       132        60
OIR    2025250     91400   18.2100 -112.3400      12.1        90       131        60
OIR    2025250     91400   18.2100 -112.3500      12.0        91       131        60
OIR    2025250     91400   18.2100 -112.3600      11.9        91       132        60
OIR    2025250     91400   18.2100 -112.3700      11.6        93       133        60
OIR    2025250     91400   18.2100 -112.3800      10.8        98       134        60
OIR    2025250     91400   18.2100 -112.3900      10.5       101       134        60
OIR    2025250     91400   18.2100 -112.4000      10.4       102       135        60
OIR    2025250     91400   18.2100 -112.4100      10.4       102       136        60
OIR    2025250     91400   18.2100 -112.4200      10.3       103       135        60
OIR    2025250     91400   18.2100 -112.4300       9.9       106       134        60
OIR    2025250     91400   18.2100 -112.4400       8.3       117       132        60
OIR    2025250     91400   18.2100 -112.4500       8.3       117       128        60
OIR    2025250     91400   18.2100 -112.4600       8.0       117       124        60
OIR    2025250     91400   18.2100 -112.4700       7.7       119       124        60
OIR    2025250     91400   18.2100 -112.4800       7.5       119       124        60
OIR    2025250     91400   18.2100 -112.4900       7.3       119       124        60
OIR    2025250     91400   18.2100 -112.5000       5.4       118       128        60
OIR    2025250     91400   18.2100 -112.5100       5.4       118       131        60
OIR    2025250     91400   18.2100 -112.5200       5.4       117       131        60
OIR    2025250     91400   18.2100 -112.5300       5.3       117       130        60
OIR    2025250     91400   18.2100 -112.5400       5.3       118       132        60
OIR    2025250     91400   18.2100 -112.5500       5.3       118       133        60
OIR    2025250     91400   18.2100 -112.5600       5.2       118       134        60
OIR    2025250     91400   18.2100 -112.5700       5.1       119       135        60
OIR    2025250     91400   18.2100 -112.5800       5.1       119       135        60
OIR    2025250     91400   18.2100 -112.5900       5.0       119       132        60
OIR    2025250     91400   18.2100 -112.6000       5.0       119       130        60
OIR    2025250     91400   18.2100 -112.6100       5.0       119       128        60
OIR    2025250     91400   18.2100 -112.6200       5.0       119       127        60
OIR    2025250     91400   18.2100 -112.6300       5.0       119       126        60
OIR    2025250     91400   18.2100 -112.6400       5.0       119       125        60
OIR    2025250     91400   18.2100 -112.6500       4.9       120       126        60
OIR    2025250     91400   18.2100 -112.6600       4.8       124       130        60
OIR    2025250     91400   18.2100 -112.6700       4.8       127       133        60
OIR    2025250     91400   18.2100 -112.6800       4.9       128       134        60
OIR    2025250     91400   18.2100 -112.6900       4.9       129       134        60
OIR    2025250     91400   18.2100 -112.7000       4.9       129       137        60
OIR    2025250     91400   18.2100 -112.7100       4.9       129       142        60
OIR    2025250     91400   18.2100 -112.7300       5.0       129       142        60
OIR    2025250     91400   18.2100 -112.7400       5.1       129       141        60
OIR    2025250     91400   18.2100 -112.7500       5.1       129       143        60
OIR    2025250     91400   18.2100 -112.7700       5.4       129       144        60
OIR    2025250     91400   18.2100 -112.7800       5.7       129       141        60
OIR    2025250     91400   18.2100 -112.7900       6.2       127       139        60
OIR    2025250     91400   18.2100 -112.8000       6.4       126       138        60
OIR    2025250     91400   18.2100 -112.8100       6.5       125       137        60
OIR    2025250     91400   18.2100 -112.8200       6.5       125       136        60
OIR    2025250     91400   18.2100 -112.8300       6.5       125       136        60
OIR    2025250     91400   18.2100 -112.8400       6.5       125       137        60
OIR    2025250     91400   18.2100 -112.8500       6.5       125       138        60
OIR    2025250     91400   18.2100 -112.8600       6.4       125       139        60
OIR    2025250     91400   18.2100 -112.8700       6.4       125       139        60
OIR    2025250     91400   18.2100 -112.8800       6.4       125       139        60
OIR    2025250     91400   18.2100 -112.8900       6.4       125       134        60
OIR    2025250     91400   18.2100 -112.9000       6.5       125       129        60
OIR    2025250     91400   18.2100 -112.9100       6.8       123       128        60
OIR    2025250     91400   18.2100 -112.9200       6.8       121       128        60
OIR    2025250     91400   18.2100 -112.9300       6.9       120       130        60
OIR    2025250     91400   18.2100 -112.9400       6.9       120       134        60
OIR    2025250     91400   18.2100 -112.9500       7.1       119       138        60
OIR    2025250     91400   18.2100 -112.9600       7.2       119       138        60
OIR    2025250     91400   18.2100 -112.9700       7.4       120       139        60
OIR    2025250     91400   18.2100 -112.9800       7.6       120       137        60
OIR    2025250     91400   18.2100 -112.9900       7.6       119       135        60
OIR    2025250     91400   18.2100 -113.0000       7.6       119       137        60
OIR    2025250     91400   18.2100 -113.0100       7.6       118       141        60
OIR    2025250     91400   18.2100 -113.0200       7.6       116       145        60
OIR    2025250     91400   18.2100 -113.1000       5.5        83       142        60
OIR    2025250     91400   18.2100 -113.1100       5.1        80       138        60
OIR    2025250     91400   18.2100 -113.1200       4.9        74       137        60
OIR    2025250     91400   18.2100 -113.1300       4.9        70       136        60
OIR    2025250     91400   18.2100 -113.1400       4.7        69       140        60
OIR    2025250     91400   18.2100 -113.1500       4.5        68       145        60
OIR    2025250     91400   18.2100 -113.3000       4.1        80       144        60
OIR    2025250     91400   18.2100 -113.3100       4.6        86       139        60
OIR    2025250     91400   18.2100 -113.3200       5.9        95       136        60
OIR    2025250     91400   18.2100 -113.3300       6.3        97       135        60
OIR    2025250     91400   18.2100 -113.3400       6.3        98       135        60
OIR    2025250     91400   18.2100 -113.3500       6.3        98       138        60
OIR    2025250     91400   18.2100 -113.3600       6.4        98       140        60
OIR    2025250     91400   18.2100 -113.3700       6.4        98       142        60
OIR    2025250     91400   18.2100 -113.7600       4.9       179       141        60
OIR    2025250     91400   18.2100 -113.7700       4.9       179       136        60
OIR    2025250     91400   18.2100 -113.7800       4.9       179       133        60
OIR    2025250     91400   18.2100 -113.7900       4.8       178       131        60
OIR    2025250     91400   18.2100 -113.8000       4.7       178       131        60
OIR    2025250     91400   18.2100 -113.8100       4.7       177       132        60
OIR    2025250     91400   18.2100 -113.8200       4.7       177       133        60
OIR    2025250     91400   18.2100 -113.8300       4.6       176       134        60
OIR    2025250     91400   18.2100 -113.8400       4.6       174       135        60
OIR    2025250     91400   18.2100 -113.8500       4.7       170       138        60
OIR    2025250     91400   18.2100 -113.8600       4.7       169       142        60
OIR    2025250     91400   18.2100 -113.8700       4.7       168       143        60
OIR    2025250     91400   18.2100 -114.3300       4.0       289       137        60
OIR    2025250     91400   18.2100 -114.3400       4.1       289       141        60
OIR    2025250     91400   18.2100 -114.3500       4.2       289       142        60
OIR    2025250     91400   18.2100 -114.3600       4.4       288       143        60
OIR    2025250     91400   18.2000 -108.7700      11.0        64       139        60
OIR    2025250     91400   18.2000 -108.7800      11.0        64       138        60
OIR    2025250     91400   18.2000 -108.7900      11.0        64       137        60
OIR    2025250     91400   18.2000 -108.8000      11.0        64       137        60
OIR    2025250     91400   18.2000 -108.8100      11.0        65       139        60
OIR    2025250     91400   18.2000 -108.8200      11.0        65       140        60
OIR    2025250     91400   18.2000 -108.8300      11.0        65       140        60
OIR    2025250     91400   18.2000 -108.8400      10.9        66       141        60
OIR    2025250     91400   18.2000 -108.9300      10.9        69       141        60
OIR    2025250     91400   18.2000 -108.9400      11.0        69       139        60
OIR    2025250     91400   18.2000 -108.9500      11.0        69       138        60
OIR    2025250     91400   18.2000 -108.9600      11.0        69       138        60
OIR    2025250     91400   18.2000 -108.9700      11.0        69       138        60
OIR    2025250     91400   18.2000 -108.9800      11.0        69       138        60
OIR    2025250     91400   18.2000 -108.9900      11.0        69       138        60
OIR    2025250     91400   18.2000 -109.0000      11.0        69       138        60
OIR    2025250     91400   18.2000 -109.0100      11.0        69       138        60
OIR    2025250     91400   18.2000 -109.0200      11.1        68       137        60
OIR    2025250     91400   18.2000 -109.0300      11.2        67       136        60
OIR    2025250     91400   18.2000 -109.0400      11.5        65       134        60
OIR    2025250     91400   18.2000 -109.0500      12.4        62       133        60
OIR    2025250     91400   18.2000 -109.0600      13.3        60       132        60
OIR    2025250     91400   18.2000 -109.0700      13.9        60       131        60
OIR    2025250     91400   18.2000 -109.0800      14.2        59       131        60
OIR    2025250     91400   18.2000 -109.0900      14.4        59       131        60
OIR    2025250     91400   18.2000 -109.1000      14.5        59       132        60
OIR    2025250     91400   18.2000 -109.1100      14.5        60       133        60
OIR    2025250     91400   18.2000 -109.1200      14.6        60       134        60
OIR    2025250     91400   18.2000 -109.1300      14.6        60       135        60
OIR    2025250     91400   18.2000 -109.1400      14.6        60       135        60
OIR    2025250     91400   18.2000 -109.1500      14.7        61       136        60
OIR    2025250     91400   18.2000 -109.1600      14.8        61       137        60
OIR    2025250     91400   18.2000 -109.1700      14.9        61       137        60
OIR    2025250     91400   18.2000 -109.1800      14.9        61       137        60
OIR    2025250     91400   18.2000 -109.1900      15.0        62       138        60
OIR    2025250     91400   18.2000 -109.2000      15.1        62       139        60
OIR    2025250     91400   18.2000 -109.2100      15.2        62       141        60
OIR    2025250     91400   18.2000 -110.9000      16.7        56       143        60
OIR    2025250     91400   18.2000 -110.9100      16.7        56       143        60
OIR    2025250     91400   18.2000 -110.9200      16.8        56       142        60
OIR    2025250     91400   18.2000 -110.9300      16.8        56       142        60
OIR    2025250     91400   18.2000 -110.9400      16.8        56       142        60
OIR    2025250     91400   18.2000 -110.9500      16.8        56       140        60
OIR    2025250     91400   18.2000 -110.9600      16.9        56       138        60
OIR    2025250     91400   18.2000 -110.9700      16.9        56       139        60
OIR    2025250     91400   18.2000 -110.9800      16.9        56       142        60
OIR    2025250     91400   18.2000 -111.2200      11.5        73       141        60
OIR    2025250     91400   18.2000 -111.2300      11.5        74       138        60
OIR    2025250     91400   18.2000 -111.2400      11.6        74       135        60
OIR    2025250     91400   18.2000 -111.2500      11.6        74       132        60
OIR    2025250     91400   18.2000 -111.2600      11.6        74       131        60
OIR    2025250     91400   18.2000 -111.2700      11.7        75       130        60
OIR    2025250     91400   18.2000 -111.2800      11.8        75       126        60
OIR    2025250     91400   18.2000 -111.2900      11.9        75       121        60
OIR    2025250     91400   18.2000 -111.3000      12.0        75       117        60
OIR    2025250     91400   18.2000 -111.3100      12.0        75       116        60
OIR    2025250     91400   18.2000 -111.3200      12.1        75       114        60
OIR    2025250     91400   18.2000 -111.3300      12.1        75       113        60
OIR    2025250     91400   18.2000 -111.3400      12.1        75       111        60
OIR    2025250     91400   18.2000 -111.3500      12.1        75       112        60
OIR    2025250     91400   18.2000 -111.3600      12.1        75       113        60
OIR    2025250     91400   18.2000 -111.3700      12.1        75       113        60
OIR    2025250     91400   18.2000 -111.3800      12.0        76       111        60
OIR    2025250     91400   18.2000 -111.3900      12.0        76       110        60
OIR    2025250     91400   18.2000 -111.4000      12.0        76       111        60
OIR    2025250     91400   18.2000 -111.4100      12.0        76       113        60
OIR    2025250     91400   18.2000 -111.4200      12.0        76       113        60
OIR    2025250     91400   18.2000 -111.4300      12.0        76       112        60
OIR    2025250     91400   18.2000 -111.4400      12.0        76       112        60
OIR    2025250     91400   18.2000 -111.4500      11.9        76       112        60
OIR    2025250     91400   18.2000 -111.4600      11.9        76       112        60
OIR    2025250     91400   18.2000 -111.4700      11.9        76       112        60
OIR    2025250     91400   18.2000 -111.4800      11.9        76       111        60
OIR    2025250     91400   18.2000 -111.4900      11.9        76       111        60
OIR    2025250     91400   18.2000 -111.5000      11.9        77       111        60
OIR    2025250     91400   18.2000 -111.5100      11.8        77       111        60
OIR    2025250     91400   18.2000 -111.5200      11.7        77       112        60
OIR    2025250     91400   18.2000 -111.5300      11.7        77       113        60
OIR    2025250     91400   18.2000 -111.5400      11.6        77       111        60
OIR    2025250     91400   18.2000 -111.5500      11.5        77       109        60
OIR    2025250     91400   18.2000 -111.5600      11.4        77       110        60
OIR    2025250     91400   18.2000 -111.5700      11.2        77       110        60
OIR    2025250     91400   18.2000 -111.5800      10.2        76       111        60
OIR    2025250     91400   18.2000 -111.5900       9.7        75       109        60
OIR    2025250     91400   18.2000 -111.6000       9.3        74       107        60
OIR    2025250     91400   18.2000 -111.6100       9.0        74       105        60
OIR    2025250     91400   18.2000 -111.6200       8.9        74       104        60
OIR    2025250     91400   18.2000 -111.6300       8.9        74       103        60
OIR    2025250     91400   18.2000 -111.6400       8.7        74       103        60
OIR    2025250     91400   18.2000 -111.6500       8.6        73       103        60
OIR    2025250     91400   18.2000 -111.6600       8.5        73       103        60
OIR    2025250     91400   18.2000 -111.6700       8.4        73       103        60
OIR    2025250     91400   18.2000 -111.6800       8.3        73       103        60
OIR    2025250     91400   18.2000 -111.6900       8.1        73       103        60
OIR    2025250     91400   18.2000 -111.7000       7.9        74       103        60
OIR    2025250     91400   18.2000 -111.7100       7.5        76       104        60
OIR    2025250     91400   18.2000 -111.7200       6.7        79       104        60
OIR    2025250     91400   18.2000 -111.7300       5.6        89       109        60
OIR    2025250     91400   18.2000 -111.7400       4.4       145       112        60
OIR    2025250     91400   18.2000 -111.7500       5.4       163       116        60
OIR    2025250     91400   18.2000 -111.7600       5.6       164       120        60
OIR    2025250     91400   18.2000 -111.7700       5.9       159       122        60
OIR    2025250     91400   18.2000 -111.7800       6.2       136       121        60
OIR    2025250     91400   18.2000 -111.7900       6.3       110       120        60
OIR    2025250     91400   18.2000 -111.8000       7.2        79       120        60
OIR    2025250     91400   18.2000 -111.8100       8.8        61       119        60
OIR    2025250     91400   18.2000 -111.8200      10.1        50       121        60
OIR    2025250     91400   18.2000 -111.8300      11.0        48       123        60
OIR    2025250     91400   18.2000 -111.8400      11.5        50       126        60
OIR    2025250     91400   18.2000 -111.8500      12.0        51       129        60
OIR    2025250     91400   18.2000 -111.8600      11.9        50       133        60
OIR    2025250     91400   18.2000 -111.8700      11.4        50       135        60
OIR    2025250     91400   18.2000 -111.8800      10.7        50       137        60
OIR    2025250     91400   18.2000 -111.8900      10.2        51       141        60
OIR    2025250     91400   18.2000 -112.0400       9.7        77       141        60
OIR    2025250     91400   18.2000 -112.0500       9.7        77       137        60
OIR    2025250     91400   18.2000 -112.0600       9.7        77       134        60
OIR    2025250     91400   18.2000 -112.0700       9.7        77       132        60
OIR    2025250     91400   18.2000 -112.0800       9.7        77       131        60
OIR    2025250     91400   18.2000 -112.0900       9.7        78       129        60
OIR    2025250     91400   18.2000 -112.1000       9.8        78       126        60
OIR    2025250     91400   18.2000 -112.1100      10.0        79       123        60
OIR    2025250     91400   18.2000 -112.1200      10.5        80       120        60
OIR    2025250     91400   18.2000 -112.1300      11.8        86       116        60
OIR    2025250     91400   18.2000 -112.1400      12.1        88       114        60
OIR    2025250     91400   18.2000 -112.1500      12.2        89       114        60
OIR    2025250     91400   18.2000 -112.1600      12.2        89       115        60
OIR    2025250     91400   18.2000 -112.1700      12.2        89       116        60
OIR    2025250     91400   18.2000 -112.1800      12.2        89       120        60
OIR    2025250     91400   18.2000 -112.1900      12.2        89       122        60
OIR    2025250     91400   18.2000 -112.2000      12.2        89       124        60
OIR    2025250     91400   18.2000 -112.2100      12.3        89       124        60
OIR    2025250     91400   18.2000 -112.2200      12.3        89       123        60
OIR    2025250     91400   18.2000 -112.2300      12.3        89       122        60
OIR    2025250     91400   18.2000 -112.2400      12.3        89       122        60
OIR    2025250     91400   18.2000 -112.2500      12.3        89       123        60
OIR    2025250     91400   18.2000 -112.2600      12.3        89       123        60
OIR    2025250     91400   18.2000 -112.2700      12.3        89       123        60
OIR    2025250     91400   18.2000 -112.2800      12.3        89       124        60
OIR    2025250     91400   18.2000 -112.2900      12.3        89       125        60
OIR    2025250     91400   18.2000 -112.3000      12.2        89       126        60
OIR    2025250     91400   18.2000 -112.3100      12.2        89       129        60
OIR    2025250     91400   18.2000 -112.3200      12.2        90       131        60
OIR    2025250     91400   18.2000 -112.3300      12.1        90       133        60
OIR    2025250     91400   18.2000 -112.3400      12.1        90       133        60
OIR    2025250     91400   18.2000 -112.3500      12.0        91       133        60
OIR    2025250     91400   18.2000 -112.3600      11.8        91       134        60
OIR    2025250     91400   18.2000 -112.3700      11.4        93       134        60
OIR    2025250     91400   18.2000 -112.3800      10.7        98       135        60
OIR    2025250     91400   18.2000 -112.3900      10.5       101       135        60
OIR    2025250     91400   18.2000 -112.4000      10.4       102       135        60
OIR    2025250     91400   18.2000 -112.4100      10.4       103       135        60
OIR    2025250     91400   18.2000 -112.4200      10.4       103       135        60
OIR    2025250     91400   18.2000 -112.4300      10.2       105       135        60
OIR    2025250     91400   18.2000 -112.4400       8.4       117       134        60
OIR    2025250     91400   18.2000 -112.4500       8.3       117       132        60
OIR    2025250     91400   18.2000 -112.4600       8.2       117       129        60
OIR    2025250     91400   18.2000 -112.4700       8.1       117       128        60
OIR    2025250     91400   18.2000 -112.4800       7.9       118       128        60
OIR    2025250     91400   18.2000 -112.4900       7.6       119       127        60
OIR    2025250     91400   18.2000 -112.5000       5.6       118       130        60
OIR    2025250     91400   18.2000 -112.5100       5.5       118       132        60
OIR    2025250     91400   18.2000 -112.5200       5.4       118       132        60
OIR    2025250     91400   18.2000 -112.5300       5.4       118       131        60
OIR    2025250     91400   18.2000 -112.5400       5.3       118       131        60
OIR    2025250     91400   18.2000 -112.5500       5.3       118       132        60
OIR    2025250     91400   18.2000 -112.5600       5.3       118       132        60
OIR    2025250     91400   18.2000 -112.5700       5.2       119       133        60
OIR    2025250     91400   18.2000 -112.5800       5.1       119       133        60
OIR    2025250     91400   18.2000 -112.5900       5.1       119       132        60
OIR    2025250     91400   18.2000 -112.6000       5.0       119       130        60
OIR    2025250     91400   18.2000 -112.6100       5.0       119       129        60
OIR    2025250     91400   18.2000 -112.6200       5.0       119       128        60
OIR    2025250     91400   18.2000 -112.6300       5.0       119       127        60
OIR    2025250     91400   18.2000 -112.6400       4.9       120       125        60
OIR    2025250     91400   18.2000 -112.6500       4.9       121       125        60
OIR    2025250     91400   18.2000 -112.6600       4.7       125       129        60
OIR    2025250     91400   18.2000 -112.6700       4.7       127       132        60
OIR    2025250     91400   18.2000 -112.6800       4.8       129       134        60
OIR    2025250     91400   18.2000 -112.6900       4.8       130       134        60
OIR    2025250     91400   18.2000 -112.7000       4.8       131       136        60
OIR    2025250     91400   18.2000 -112.7100       4.8       132       141        60
OIR    2025250     91400   18.2000 -112.7400       5.0       131       143        60
OIR    2025250     91400   18.2000 -112.7800       5.5       132       143        60
OIR    2025250     91400   18.2000 -112.7900       5.8       130       138        60
OIR    2025250     91400   18.2000 -112.8000       6.2       127       138        60
OIR    2025250     91400   18.2000 -112.8100       6.3       126       138        60
OIR    2025250     91400   18.2000 -112.8200       6.4       126       138        60
OIR    2025250     91400   18.2000 -112.8300       6.5       126       138        60
OIR    2025250     91400   18.2000 -112.8400       6.5       126       138        60
OIR    2025250     91400   18.2000 -112.8500       6.4       126       139        60
OIR    2025250     91400   18.2000 -112.8600       6.3       126       139        60
OIR    2025250     91400   18.2000 -112.8700       6.3       126       139        60
OIR    2025250     91400   18.2000 -112.8800       6.2       125       140        60
OIR    2025250     91400   18.2000 -112.8900       6.2       125       135        60
OIR    2025250     91400   18.2000 -112.9000       6.2       124       131        60
OIR    2025250     91400   18.2000 -112.9100       6.4       122       128        60
OIR    2025250     91400   18.2000 -112.9200       6.6       121       127        60
OIR    2025250     91400   18.2000 -112.9300       6.7       119       129        60
OIR    2025250     91400   18.2000 -112.9400       6.7       119       134        60
OIR    2025250     91400   18.2000 -112.9500       6.9       119       139        60
OIR    2025250     91400   18.2000 -112.9600       7.0       119       141        60
OIR    2025250     91400   18.2000 -112.9700       7.4       119       144        60
OIR    2025250     91400   18.2000 -112.9800       7.5       119       144        60
OIR    2025250     91400   18.2000 -112.9900       7.6       119       143        60
OIR    2025250     91400   18.2000 -113.0000       7.6       119       143        60
OIR    2025250     91400   18.2000 -113.1100       5.0        73       142        60
OIR    2025250     91400   18.2000 -113.1200       4.9        69       143        60
OIR    2025250     91400   18.2000 -113.1300       4.8        67       144        60
OIR    2025250     91400   18.2000 -113.3000       4.1        78       144        60
OIR    2025250     91400   18.2000 -113.3100       4.8        88       139        60
OIR    2025250     91400   18.2000 -113.3200       6.0        96       135        60
OIR    2025250     91400   18.2000 -113.3300       6.2        97       136        60
OIR    2025250     91400   18.2000 -113.3400       6.3        98       136        60
OIR    2025250     91400   18.2000 -113.3500       6.3        98       137        60
OIR    2025250     91400   18.2000 -113.3600       6.4        98       138        60
OIR    2025250     91400   18.2000 -113.3700       6.4        98       139        60
OIR    2025250     91400   18.2000 -113.3800       6.4        98       140        60
OIR    2025250     91400   18.2000 -113.3900       6.4        98       142        60
OIR    2025250     91400   18.2000 -113.7600       5.0       179       142        60
OIR    2025250     91400   18.2000 -113.7700       4.9       179       138        60
OIR    2025250     91400   18.2000 -113.7800       4.9       178       136        60
OIR    2025250     91400   18.2000 -113.7900       4.9       178       136        60
OIR    2025250     91400   18.2000 -113.8000       4.8       177       135        60
OIR    2025250     91400   18.2000 -113.8100       4.8       177       136        60
OIR    2025250     91400   18.2000 -113.8200       4.7       177       137        60
OIR    2025250     91400   18.2000 -113.8300       4.7       176       139        60
OIR    2025250     91400   18.2000 -113.8400       4.7       173       142        60
OIR    2025250     91400   18.2000 -114.3400       4.1       290       139        60
OIR    2025250     91400   18.2000 -114.3500       4.2       289       141        60
OIR    2025250     91400   18.2000 -114.3600       4.3       288       144        60
OIR    2025250     91400   18.1900 -108.7800      11.0        64       142        60
OIR    2025250     91400   18.1900 -108.7900      11.0        64       139        60
OIR    2025250     91400   18.1900 -108.8000      11.0        64       137        60
OIR    2025250     91400   18.1900 -108.8100      11.0        64       139        60
OIR    2025250     91400   18.1900 -108.8200      11.0        65       141        60
OIR    2025250     91400   18.1900 -108.8300      10.9        65       142        60
OIR    2025250     91400   18.1900 -108.9500      11.0        69       142        60
OIR    2025250     91400   18.1900 -108.9600      11.0        69       140        60
OIR    2025250     91400   18.1900 -108.9700      11.0        69       140        60
OIR    2025250     91400   18.1900 -108.9800      11.0        69       141        60
OIR    2025250     91400   18.1900 -108.9900      11.0        69       141        60
OIR    2025250     91400   18.1900 -109.0000      11.0        69       142        60
OIR    2025250     91400   18.1900 -109.0300      10.9        67       141        60
OIR    2025250     91400   18.1900 -109.0400      11.0        64       138        60
OIR    2025250     91400   18.1900 -109.0500      11.5        62       136        60
OIR    2025250     91400   18.1900 -109.0600      12.0        59       134        60
OIR    2025250     91400   18.1900 -109.0700      12.7        59       133        60
OIR    2025250     91400   18.1900 -109.0800      13.4        59       133        60
OIR    2025250     91400   18.1900 -109.0900      13.8        59       133        60
OIR    2025250     91400   18.1900 -109.1000      14.1        59       133        60
OIR    2025250     91400   18.1900 -109.1100      14.3        60       133        60
OIR    2025250     91400   18.1900 -109.1200      14.4        60       134        60
OIR    2025250     91400   18.1900 -109.1300      14.5        60       135        60
OIR    2025250     91400   18.1900 -109.1400      14.5        60       136        60
OIR    2025250     91400   18.1900 -109.1500      14.6        61       137        60
OIR    2025250     91400   18.1900 -109.1600      14.7        61       137        60
OIR    2025250     91400   18.1900 -109.1700      14.8        61       138        60
OIR    2025250     91400   18.1900 -109.1800      14.9        62       139        60
OIR    2025250     91400   18.1900 -109.1900      15.0        62       139        60
OIR    2025250     91400   18.1900 -109.2000      15.1        62       140        60
OIR    2025250     91400   18.1900 -109.2100      15.2        63       141        60
OIR    2025250     91400   18.1900 -110.5400      16.7        47       143        60
OIR    2025250     91400   18.1900 -110.5500      16.6        48       142        60
OIR    2025250     91400   18.1900 -110.5600      16.6        49       142        60
OIR    2025250     91400   18.1900 -110.8900      16.7        56       144        60
OIR    2025250     91400   18.1900 -110.9000      16.7        56       142        60
OIR    2025250     91400   18.1900 -110.9100      16.7        56       142        60
OIR    2025250     91400   18.1900 -110.9200      16.7        56       142        60
OIR    2025250     91400   18.1900 -110.9300      16.8        56       141        60
OIR    2025250     91400   18.1900 -110.9400      16.8        56       140        60
OIR    2025250     91400   18.1900 -110.9500      16.8        56       139        60
OIR    2025250     91400   18.1900 -110.9600      16.9        56       137        60
OIR    2025250     91400   18.1900 -110.9700      16.9        56       137        60
OIR    2025250     91400   18.1900 -110.9800      16.9        57       138        60
OIR    2025250     91400   18.1900 -110.9900      17.0        57       141        60
OIR    2025250     91400   18.1900 -111.0000      17.0        57       144        60
OIR    2025250     91400   18.1900 -111.0500      17.1        57       144        60
OIR    2025250     91400   18.1900 -111.0600      17.1        57       141        60
OIR    2025250     91400   18.1900 -111.0700      17.1        57       144        60
OIR    2025250     91400   18.1900 -111.2400      11.6        74       142        60
OIR    2025250     91400   18.1900 -111.2500      11.6        74       138        60
OIR    2025250     91400   18.1900 -111.2600      11.6        74       136        60
OIR    2025250     91400   18.1900 -111.2700      11.7        74       134        60
OIR    2025250     91400   18.1900 -111.2800      11.8        75       131        60
OIR    2025250     91400   18.1900 -111.2900      11.9        75       127        60
OIR    2025250     91400   18.1900 -111.3000      12.0        75       124        60
OIR    2025250     91400   18.1900 -111.3100      12.0        75       120        60
OIR    2025250     91400   18.1900 -111.3200      12.1        75       116        60
OIR    2025250     91400   18.1900 -111.3300      12.1        75       114        60
OIR    2025250     91400   18.1900 -111.3400      12.1        75       113        60
OIR    2025250     91400   18.1900 -111.3500      12.1        75       114        60
OIR    2025250     91400   18.1900 -111.3600      12.1        75       115        60
OIR    2025250     91400   18.1900 -111.3700      12.1        75       116        60
OIR    2025250     91400   18.1900 -111.3800      12.1        76       116        60
OIR    2025250     91400   18.1900 -111.3900      12.0        76       116        60
OIR    2025250     91400   18.1900 -111.4000      12.0        76       116        60
OIR    2025250     91400   18.1900 -111.4100      12.0        76       116        60
OIR    2025250     91400   18.1900 -111.4200      12.0        76       116        60
OIR    2025250     91400   18.1900 -111.4300      12.0        76       115        60
OIR    2025250     91400   18.1900 -111.4400      12.0        76       114        60
OIR    2025250     91400   18.1900 -111.4500      11.9        76       114        60
OIR    2025250     91400   18.1900 -111.4600      11.9        76       114        60
OIR    2025250     91400   18.1900 -111.4700      11.9        76       114        60
OIR    2025250     91400   18.1900 -111.4800      11.9        76       115        60
OIR    2025250     91400   18.1900 -111.4900      11.9        76       115        60
OIR    2025250     91400   18.1900 -111.5000      11.8        76       114        60
OIR    2025250     91400   18.1900 -111.5100      11.8        76       114        60
OIR    2025250     91400   18.1900 -111.5200      11.7        76       114        60
OIR    2025250     91400   18.1900 -111.5300      11.7        77       114        60
OIR    2025250     91400   18.1900 -111.5400      11.6        77       113        60
OIR    2025250     91400   18.1900 -111.5500      11.5        77       111        60
OIR    2025250     91400   18.1900 -111.5600      11.4        77       111        60
OIR    2025250     91400   18.1900 -111.5700      11.2        76       111        60
OIR    2025250     91400   18.1900 -111.5800      10.5        75       112        60
OIR    2025250     91400   18.1900 -111.5900       9.9        73       110        60
OIR    2025250     91400   18.1900 -111.6000       9.4        72       108        60
OIR    2025250     91400   18.1900 -111.6100       9.2        72       105        60
OIR    2025250     91400   18.1900 -111.6200       9.0        73       104        60
OIR    2025250     91400   18.1900 -111.6300       8.9        73       103        60
OIR    2025250     91400   18.1900 -111.6400       8.8        73       103        60
OIR    2025250     91400   18.1900 -111.6500       8.7        73       103        60
OIR    2025250     91400   18.1900 -111.6600       8.6        72       103        60
OIR    2025250     91400   18.1900 -111.6700       8.5        72       103        60
OIR    2025250     91400   18.1900 -111.6800       8.4        72       103        60
OIR    2025250     91400   18.1900 -111.6900       8.2        72       103        60
OIR    2025250     91400   18.1900 -111.7000       7.7        73       103        60
OIR    2025250     91400   18.1900 -111.7100       6.8        74       103        60
OIR    2025250     91400   18.1900 -111.7200       6.0        77       104        60
OIR    2025250     91400   18.1900 -111.7300       5.4        82       108        60
OIR    2025250     91400   18.1900 -111.7400       4.2       111       111        60
OIR    2025250     91400   18.1900 -111.7500       5.0       157       115        60
OIR    2025250     91400   18.1900 -111.7600       5.6       163       120        60
OIR    2025250     91400   18.1900 -111.7700       5.7       158       124        60
OIR    2025250     91400   18.1900 -111.7800       5.7       142       125        60
OIR    2025250     91400   18.1900 -111.7900       5.4       122       125        60
OIR    2025250     91400   18.1900 -111.8000       5.5        95       125        60
OIR    2025250     91400   18.1900 -111.8100       6.3        71       124        60
OIR    2025250     91400   18.1900 -111.8200       7.7        57       124        60
OIR    2025250     91400   18.1900 -111.8300       9.2        53       127        60
OIR    2025250     91400   18.1900 -111.8400      10.3        53       129        60
OIR    2025250     91400   18.1900 -111.8500      10.9        52       133        60
OIR    2025250     91400   18.1900 -111.8600      10.9        52       136        60
OIR    2025250     91400   18.1900 -111.8700      10.6        51       137        60
OIR    2025250     91400   18.1900 -111.8800      10.2        51       138        60
OIR    2025250     91400   18.1900 -111.8900       9.9        51       141        60
OIR    2025250     91400   18.1900 -111.9800       8.8        68       142        60
OIR    2025250     91400   18.1900 -111.9900       9.2        73       143        60
OIR    2025250     91400   18.1900 -112.0100       9.6        76       143        60
OIR    2025250     91400   18.1900 -112.0200       9.7        77       143        60
OIR    2025250     91400   18.1900 -112.0300       9.7        77       140        60
OIR    2025250     91400   18.1900 -112.0400       9.7        77       137        60
OIR    2025250     91400   18.1900 -112.0500       9.6        77       134        60
OIR    2025250     91400   18.1900 -112.0600       9.6        77       132        60
OIR    2025250     91400   18.1900 -112.0700       9.6        78       129        60
OIR    2025250     91400   18.1900 -112.0800       9.7        78       127        60
OIR    2025250     91400   18.1900 -112.0900       9.7        79       126        60
OIR    2025250     91400   18.1900 -112.1000       9.8        79       123        60
OIR    2025250     91400   18.1900 -112.1100      10.0        80       120        60
OIR    2025250     91400   18.1900 -112.1200      10.5        81       117        60
OIR    2025250     91400   18.1900 -112.1300      11.8        86       115        60
OIR    2025250     91400   18.1900 -112.1400      12.0        88       113        60
OIR    2025250     91400   18.1900 -112.1500      12.2        89       114        60
OIR    2025250     91400   18.1900 -112.1600      12.2        89       115        60
OIR    2025250     91400   18.1900 -112.1700      12.2        89       116        60
OIR    2025250     91400   18.1900 -112.1800      12.2        89       120        60
OIR    2025250     91400   18.1900 -112.1900      12.2        89       122        60
OIR    2025250     91400   18.1900 -112.2000      12.3        89       123        60
OIR    2025250     91400   18.1900 -112.2100      12.3        89       124        60
OIR    2025250     91400   18.1900 -112.2200      12.3        89       123        60
OIR    2025250     91400   18.1900 -112.2300      12.3        89       122        60
OIR    2025250     91400   18.1900 -112.2400      12.3        89       121        60
OIR    2025250     91400   18.1900 -112.2500      12.3        89       121        60
OIR    2025250     91400   18.1900 -112.2600      12.3        89       122        60
OIR    2025250     91400   18.1900 -112.2700      12.3        89       123        60
OIR    2025250     91400   18.1900 -112.2800      12.3        89       123        60
OIR    2025250     91400   18.1900 -112.2900      12.3        89       125        60
OIR    2025250     91400   18.1900 -112.3000      12.2        89       126        60
OIR    2025250     91400   18.1900 -112.3100      12.2        89       128        60
OIR    2025250     91400   18.1900 -112.3200      12.2        90       131        60
OIR    2025250     91400   18.1900 -112.3300      12.1        90       133        60
OIR    2025250     91400   18.1900 -112.3400      12.0        90       133        60
OIR    2025250     91400   18.1900 -112.3500      11.9        91       133        60
OIR    2025250     91400   18.1900 -112.3600      11.7        92       134        60
OIR    2025250     91400   18.1900 -112.3700      11.4        94       134        60
OIR    2025250     91400   18.1900 -112.3800      10.7       100       135        60
OIR    2025250     91400   18.1900 -112.3900      10.5       102       135        60
OIR    2025250     91400   18.1900 -112.4000      10.5       102       135        60
OIR    2025250     91400   18.1900 -112.4100      10.4       103       135        60
OIR    2025250     91400   18.1900 -112.4200      10.4       103       135        60
OIR    2025250     91400   18.1900 -112.4300      10.3       104       135        60
OIR    2025250     91400   18.1900 -112.4400       8.7       114       135        60
OIR    2025250     91400   18.1900 -112.4500       8.4       117       135        60
OIR    2025250     91400   18.1900 -112.4600       8.3       117       134        60
OIR    2025250     91400   18.1900 -112.4700       8.2       117       133        60
OIR    2025250     91400   18.1900 -112.4800       8.1       117       132        60
OIR    2025250     91400   18.1900 -112.4900       7.8       117       131        60
OIR    2025250     91400   18.1900 -112.5000       6.0       117       132        60
OIR    2025250     91400   18.1900 -112.5100       5.6       118       134        60
OIR    2025250     91400   18.1900 -112.5200       5.5       118       134        60
OIR    2025250     91400   18.1900 -112.5300       5.5       118       133        60
OIR    2025250     91400   18.1900 -112.5400       5.4       118       132        60
OIR    2025250     91400   18.1900 -112.5500       5.3       119       131        60
OIR    2025250     91400   18.1900 -112.5600       5.3       119       131        60
OIR    2025250     91400   18.1900 -112.5700       5.2       119       131        60
OIR    2025250     91400   18.1900 -112.5800       5.2       120       130        60
OIR    2025250     91400   18.1900 -112.5900       5.1       120       130        60
OIR    2025250     91400   18.1900 -112.6000       5.1       120       129        60
OIR    2025250     91400   18.1900 -112.6100       5.0       120       129        60
OIR    2025250     91400   18.1900 -112.6200       5.0       120       130        60
OIR    2025250     91400   18.1900 -112.6300       5.0       120       130        60
OIR    2025250     91400   18.1900 -112.6400       4.9       121       129        60
OIR    2025250     91400   18.1900 -112.6500       4.8       123       128        60
OIR    2025250     91400   18.1900 -112.6600       4.7       126       130        60
OIR    2025250     91400   18.1900 -112.6700       4.7       128       132        60
OIR    2025250     91400   18.1900 -112.6800       4.7       130       135        60
OIR    2025250     91400   18.1900 -112.6900       4.7       132       137        60
OIR    2025250     91400   18.1900 -112.7000       4.7       134       139        60
OIR    2025250     91400   18.1900 -112.7100       4.7       136       142        60
OIR    2025250     91400   18.1900 -112.7900       5.4       136       141        60
OIR    2025250     91400   18.1900 -112.8000       5.7       132       139        60
OIR    2025250     91400   18.1900 -112.8100       6.0       129       138        60
OIR    2025250     91400   18.1900 -112.8200       6.1       128       137        60
OIR    2025250     91400   18.1900 -112.8300       6.2       128       138        60
OIR    2025250     91400   18.1900 -112.8400       6.3       127       138        60
OIR    2025250     91400   18.1900 -112.8500       6.3       127       140        60
OIR    2025250     91400   18.1900 -112.8600       6.2       127       141        60
OIR    2025250     91400   18.1900 -112.8700       6.2       126       140        60
OIR    2025250     91400   18.1900 -112.8800       6.2       125       140        60
OIR    2025250     91400   18.1900 -112.8900       6.1       125       137        60
OIR    2025250     91400   18.1900 -112.9000       6.1       124       134        60
OIR    2025250     91400   18.1900 -112.9100       6.2       123       131        60
OIR    2025250     91400   18.1900 -112.9200       6.4       121       129        60
OIR    2025250     91400   18.1900 -112.9300       6.5       119       129        60
OIR    2025250     91400   18.1900 -112.9400       6.6       119       133        60
OIR    2025250     91400   18.1900 -112.9500       6.8       119       137        60
OIR    2025250     91400   18.1900 -112.9600       6.9       119       141        60
OIR    2025250     91400   18.1900 -113.3000       4.1        76       140        60
OIR    2025250     91400   18.1900 -113.3100       4.7        84       139        60
OIR    2025250     91400   18.1900 -113.3200       5.7        96       138        60
OIR    2025250     91400   18.1900 -113.3300       6.1        98       139        60
OIR    2025250     91400   18.1900 -113.3400       6.2        98       139        60
OIR    2025250     91400   18.1900 -113.3500       6.3        98       140        60
OIR    2025250     91400   18.1900 -113.3600       6.3        98       140        60
OIR    2025250     91400   18.1900 -113.3700       6.4        98       140        60
OIR    2025250     91400   18.1900 -113.3800       6.4        98       139        60
OIR    2025250     91400   18.1900 -113.3900       6.4        98       140        60
OIR    2025250     91400   18.1900 -113.7700       5.1       178       141        60
OIR    2025250     91400   18.1900 -113.7800       5.0       177       139        60
OIR    2025250     91400   18.1900 -113.7900       5.1       177       139        60
OIR    2025250     91400   18.1900 -113.8000       5.0       177       140        60
OIR    2025250     91400   18.1900 -113.8100       5.0       176       141        60
OIR    2025250     91400   18.1900 -113.8200       4.9       176       142        60
OIR    2025250     91400   18.1900 -114.3300       4.0       291       138        60
OIR    2025250     91400   18.1900 -114.3400       4.1       291       139        60
OIR    2025250     91400   18.1900 -114.3500       4.2       290       141        60
OIR    2025250     91400   18.1800 -108.8000      11.0        64       139        60
OIR    2025250     91400   18.1800 -108.8100      11.0        64       140        60
OIR    2025250     91400   18.1800 -108.8200      11.0        64       142        60
OIR    2025250     91400   18.1800 -108.9700      11.0        69       142        60
OIR    2025250     91400   18.1800 -109.0500      10.6        60       141        60
OIR    2025250     91400   18.1800 -109.0600      10.9        58       138        60
OIR    2025250     91400   18.1800 -109.0700      11.3        58       135        60
OIR    2025250     91400   18.1800 -109.0800      11.9        58       135        60
OIR    2025250     91400   18.1800 -109.0900      12.3        58       135        60
OIR    2025250     91400   18.1800 -109.1000      12.6        58       136        60
OIR    2025250     91400   18.1800 -109.1100      13.1        59       136        60
OIR    2025250     91400   18.1800 -109.1200      13.7        60       136        60
OIR    2025250     91400   18.1800 -109.1300      14.1        60       136        60
OIR    2025250     91400   18.1800 -109.1400      14.3        60       136        60
OIR    2025250     91400   18.1800 -109.1500      14.5        61       138        60
OIR    2025250     91400   18.1800 -109.1600      14.6        61       140        60
OIR    2025250     91400   18.1800 -109.1700      14.7        61       142        60
OIR    2025250     91400   18.1800 -110.5600      16.6        50       143        60
OIR    2025250     91400   18.1800 -110.8800      16.7        56       144        60
OIR    2025250     91400   18.1800 -110.8900      16.7        56       143        60
OIR    2025250     91400   18.1800 -110.9000      16.7        56       142        60
OIR    2025250     91400   18.1800 -110.9100      16.7        56       143        60
OIR    2025250     91400   18.1800 -110.9200      16.7        56       143        60
OIR    2025250     91400   18.1800 -110.9300      16.8        56       141        60
OIR    2025250     91400   18.1800 -110.9400      16.8        56       138        60
OIR    2025250     91400   18.1800 -110.9500      16.8        56       137        60
OIR    2025250     91400   18.1800 -110.9600      16.9        57       137        60
OIR    2025250     91400   18.1800 -110.9700      16.9        57       137        60
OIR    2025250     91400   18.1800 -110.9800      16.9        57       135        60
OIR    2025250     91400   18.1800 -110.9900      17.0        57       134        60
OIR    2025250     91400   18.1800 -111.0000      17.0        57       137        60
OIR    2025250     91400   18.1800 -111.0100      17.0        57       142        60
OIR    2025250     91400   18.1800 -111.0600      17.1        57       140        60
OIR    2025250     91400   18.1800 -111.0700      17.1        57       140        60
OIR    2025250     91400   18.1800 -111.0800      17.1        57       141        60
OIR    2025250     91400   18.1800 -111.0900      17.1        57       142        60
OIR    2025250     91400   18.1800 -111.2500      11.6        74       143        60
OIR    2025250     91400   18.1800 -111.2600      11.6        74       141        60
OIR    2025250     91400   18.1800 -111.2700      11.7        74       139        60
OIR    2025250     91400   18.1800 -111.2800      11.9        74       137        60
OIR    2025250     91400   18.1800 -111.2900      12.0        74       134        60
OIR    2025250     91400   18.1800 -111.3000      12.1        74       131        60
OIR    2025250     91400   18.1800 -111.3100      12.1        74       126        60
OIR    2025250     91400   18.1800 -111.3200      12.1        74       122        60
OIR    2025250     91400   18.1800 -111.3300      12.1        75       119        60
OIR    2025250     91400   18.1800 -111.3400      12.1        75       116        60
OIR    2025250     91400   18.1800 -111.3500      12.1        75       116        60
OIR    2025250     91400   18.1800 -111.3600      12.1        75       117        60
OIR    2025250     91400   18.1800 -111.3700      12.1        75       120        60
OIR    2025250     91400   18.1800 -111.3800      12.1        76       121        60
OIR    2025250     91400   18.1800 -111.3900      12.1        76       121        60
OIR    2025250     91400   18.1800 -111.4000      12.0        76       121        60
OIR    2025250     91400   18.1800 -111.4100      12.0        76       120        60
OIR    2025250     91400   18.1800 -111.4200      12.0        76       119        60
OIR    2025250     91400   18.1800 -111.4300      12.0        76       117        60
OIR    2025250     91400   18.1800 -111.4400      12.0        76       116        60
OIR    2025250     91400   18.1800 -111.4500      11.9        76       116        60
OIR    2025250     91400   18.1800 -111.4600      11.9        76       116        60
OIR    2025250     91400   18.1800 -111.4700      11.9        76       116        60
OIR    2025250     91400   18.1800 -111.4800      11.9        76       117        60
OIR    2025250     91400   18.1800 -111.4900      11.9        76       117        60
OIR    2025250     91400   18.1800 -111.5000      11.8        76       116        60
OIR    2025250     91400   18.1800 -111.5100      11.8        76       116        60
OIR    2025250     91400   18.1800 -111.5200      11.7        76       116        60
OIR    2025250     91400   18.1800 -111.5300      11.7        76       115        60
OIR    2025250     91400   18.1800 -111.5400      11.6        76       115        60
OIR    2025250     91400   18.1800 -111.5500      11.5        76       114        60
OIR    2025250     91400   18.1800 -111.5600      11.3        75       113        60
OIR    2025250     91400   18.1800 -111.5700      11.0        74       113        60
OIR    2025250     91400   18.1800 -111.5800      10.6        73       112        60
OIR    2025250     91400   18.1800 -111.5900      10.0        71       110        60
OIR    2025250     91400   18.1800 -111.6000       9.7        70       108        60
OIR    2025250     91400   18.1800 -111.6100       9.5        70       105        60
OIR    2025250     91400   18.1800 -111.6200       9.2        72       104        60
OIR    2025250     91400   18.1800 -111.6300       8.9        72       103        60
OIR    2025250     91400   18.1800 -111.6400       8.8        72       103        60
OIR    2025250     91400   18.1800 -111.6500       8.7        72       103        60
OIR    2025250     91400   18.1800 -111.6600       8.6        72       103        60
OIR    2025250     91400   18.1800 -111.6700       8.5        72       103        60
OIR    2025250     91400   18.1800 -111.6800       8.4        72       103        60
OIR    2025250     91400   18.1800 -111.6900       8.3        72       103        60
OIR    2025250     91400   18.1800 -111.7000       7.5        72       103        60
OIR    2025250     91400   18.1800 -111.7100       6.3        74       103        60
OIR    2025250     91400   18.1800 -111.7200       5.8        76       103        60
OIR    2025250     91400   18.1800 -111.7300       5.6        78       105        60
OIR    2025250     91400   18.1800 -111.7400       4.8        84       110        60
OIR    2025250     91400   18.1800 -111.7500       4.0       110       114        60
OIR    2025250     91400   18.1800 -111.7600       4.8       154       119        60
OIR    2025250     91400   18.1800 -111.7700       5.2       154       124        60
OIR    2025250     91400   18.1800 -111.7800       5.1       140       126        60
OIR    2025250     91400   18.1800 -111.7900       4.9       123       128        60
OIR    2025250     91400   18.1800 -111.8000       5.0       101       128        60
OIR    2025250     91400   18.1800 -111.8100       5.5        82       128        60
OIR    2025250     91400   18.1800 -111.8200       6.5        65       129        60
OIR    2025250     91400   18.1800 -111.8300       8.1        59       132        60
OIR    2025250     91400   18.1800 -111.8400       9.6        55       135        60
OIR    2025250     91400   18.1800 -111.8500      10.1        53       138        60
OIR    2025250     91400   18.1800 -111.8600      10.2        53       142        60
OIR    2025250     91400   18.1800 -111.8700      10.0        52       143        60
OIR    2025250     91400   18.1800 -111.8800       9.8        52       143        60
OIR    2025250     91400   18.1800 -111.9700       8.5        62       142        60
OIR    2025250     91400   18.1800 -111.9800       8.7        68       137        60
OIR    2025250     91400   18.1800 -111.9900       9.0        74       137        60
OIR    2025250     91400   18.1800 -112.0000       9.3        76       137        60
OIR    2025250     91400   18.1800 -112.0100       9.5        78       137        60
OIR    2025250     91400   18.1800 -112.0200       9.6        79       136        60
OIR    2025250     91400   18.1800 -112.0300       9.6        80       135        60
OIR    2025250     91400   18.1800 -112.0400       9.6        80       133        60
OIR    2025250     91400   18.1800 -112.0500       9.6        80       131        60
OIR    2025250     91400   18.1800 -112.0600       9.6        79       129        60
OIR    2025250     91400   18.1800 -112.0700       9.7        79       127        60
OIR    2025250     91400   18.1800 -112.0800       9.7        79       125        60
OIR    2025250     91400   18.1800 -112.0900       9.8        80       123        60
OIR    2025250     91400   18.1800 -112.1000       9.9        81       120        60
OIR    2025250     91400   18.1800 -112.1100      10.1        82       117        60
OIR    2025250     91400   18.1800 -112.1200      10.6        84       116        60
OIR    2025250     91400   18.1800 -112.1300      11.8        88       114        60
OIR    2025250     91400   18.1800 -112.1400      12.0        89       113        60
OIR    2025250     91400   18.1800 -112.1500      12.1        89       114        60
OIR    2025250     91400   18.1800 -112.1600      12.2        89       116        60
OIR    2025250     91400   18.1800 -112.1700      12.2        89       117        60
OIR    2025250     91400   18.1800 -112.1800      12.2        89       120        60
OIR    2025250     91400   18.1800 -112.1900      12.2        89       123        60
OIR    2025250     91400   18.1800 -112.2000      12.3        89       123        60
OIR    2025250     91400   18.1800 -112.2100      12.3        89       123        60
OIR    2025250     91400   18.1800 -112.2200      12.3        89       123        60
OIR    2025250     91400   18.1800 -112.2300      12.3        89       121        60
OIR    2025250     91400   18.1800 -112.2400      12.3        89       120        60
OIR    2025250     91400   18.1800 -112.2500      12.3        89       121        60
OIR    2025250     91400   18.1800 -112.2600      12.3        89       121        60
OIR    2025250     91400   18.1800 -112.2700      12.3        89       122        60
OIR    2025250     91400   18.1800 -112.2800      12.3        89       123        60
OIR    2025250     91400   18.1800 -112.2900      12.3        89       124        60
OIR    2025250     91400   18.1800 -112.3000      12.2        89       126        60
OIR    2025250     91400   18.1800 -112.3100      12.2        89       128        60
OIR    2025250     91400   18.1800 -112.3200      12.2        89       130        60
OIR    2025250     91400   18.1800 -112.3300      12.1        90       132        60
OIR    2025250     91400   18.1800 -112.3400      12.0        90       132        60
OIR    2025250     91400   18.1800 -112.3500      11.8        91       132        60
OIR    2025250     91400   18.1800 -112.3600      11.6        92       131        60
OIR    2025250     91400   18.1800 -112.3700      11.3        95       130        60
OIR    2025250     91400   18.1800 -112.3800      10.6       101       131        60
OIR    2025250     91400   18.1800 -112.3900      10.6       102       133        60
OIR    2025250     91400   18.1800 -112.4000      10.5       103       135        60
OIR    2025250     91400   18.1800 -112.4100      10.5       103       135        60
OIR    2025250     91400   18.1800 -112.4200      10.4       104       136        60
OIR    2025250     91400   18.1800 -112.4300      10.3       104       136        60
OIR    2025250     91400   18.1800 -112.4400       9.4       109       137        60
OIR    2025250     91400   18.1800 -112.4500       8.7       114       136        60
OIR    2025250     91400   18.1800 -112.4600       8.4       116       135        60
OIR    2025250     91400   18.1800 -112.4700       8.3       117       134        60
OIR    2025250     91400   18.1800 -112.4800       8.2       117       133        60
OIR    2025250     91400   18.1800 -112.4900       7.8       117       133        60
OIR    2025250     91400   18.1800 -112.5000       6.4       117       134        60
OIR    2025250     91400   18.1800 -112.5100       5.7       118       135        60
OIR    2025250     91400   18.1800 -112.5200       5.6       118       136        60
OIR    2025250     91400   18.1800 -112.5300       5.5       119       135        60
OIR    2025250     91400   18.1800 -112.5400       5.5       119       135        60
OIR    2025250     91400   18.1800 -112.5500       5.4       119       132        60
OIR    2025250     91400   18.1800 -112.5600       5.3       119       130        60
OIR    2025250     91400   18.1800 -112.5700       5.3       120       131        60
OIR    2025250     91400   18.1800 -112.5800       5.2       120       132        60
OIR    2025250     91400   18.1800 -112.5900       5.1       120       131        60
OIR    2025250     91400   18.1800 -112.6000       5.1       120       130        60
OIR    2025250     91400   18.1800 -112.6100       5.0       121       130        60
OIR    2025250     91400   18.1800 -112.6200       5.0       121       131        60
OIR    2025250     91400   18.1800 -112.6300       5.0       121       132        60
OIR    2025250     91400   18.1800 -112.6400       4.9       123       132        60
OIR    2025250     91400   18.1800 -112.6500       4.7       125       131        60
OIR    2025250     91400   18.1800 -112.6600       4.7       128       131        60
OIR    2025250     91400   18.1800 -112.6700       4.6       130       133        60
OIR    2025250     91400   18.1800 -112.6800       4.6       132       135        60
OIR    2025250     91400   18.1800 -112.6900       4.6       134       138        60
OIR    2025250     91400   18.1800 -112.7000       4.6       137       141        60
OIR    2025250     91400   18.1800 -112.7100       4.6       140       143        60
OIR    2025250     91400   18.1800 -112.7900       5.0       142       144        60
OIR    2025250     91400   18.1800 -112.8000       5.2       140       142        60
OIR    2025250     91400   18.1800 -112.8100       5.5       135       139        60
OIR    2025250     91400   18.1800 -112.8200       5.6       133       137        60
OIR    2025250     91400   18.1800 -112.8300       5.7       134       137        60
OIR    2025250     91400   18.1800 -112.8400       5.9       132       138        60
OIR    2025250     91400   18.1800 -112.8500       6.0       130       140        60
OIR    2025250     91400   18.1800 -112.8600       6.0       129       143        60
OIR    2025250     91400   18.1800 -112.8700       6.1       127       142        60
OIR    2025250     91400   18.1800 -112.8800       6.0       126       141        60
OIR    2025250     91400   18.1800 -112.8900       6.0       125       139        60
OIR    2025250     91400   18.1800 -112.9000       6.0       124       137        60
OIR    2025250     91400   18.1800 -112.9100       6.0       123       135        60
OIR    2025250     91400   18.1800 -112.9200       6.0       121       133        60
OIR    2025250     91400   18.1800 -112.9300       6.0       119       132        60
OIR    2025250     91400   18.1800 -112.9400       6.2       119       132        60
OIR    2025250     91400   18.1800 -112.9500       6.5       118       133        60
OIR    2025250     91400   18.1800 -112.9600       6.5       120       138        60
OIR    2025250     91400   18.1800 -112.9700       6.9       119       145        60
OIR    2025250     91400   18.1800 -113.3100       4.4        84       137        60
OIR    2025250     91400   18.1800 -113.3200       5.4        95       138        60
OIR    2025250     91400   18.1800 -113.3300       5.9        98       138        60
OIR    2025250     91400   18.1800 -113.3400       6.1        99       139        60
OIR    2025250     91400   18.1800 -113.3500       6.2        99       139        60
OIR    2025250     91400   18.1800 -113.3600       6.3        99       140        60
OIR    2025250     91400   18.1800 -113.3700       6.3        99       140        60
OIR    2025250     91400   18.1800 -113.3800       6.3        99       139        60
OIR    2025250     91400   18.1800 -113.3900       6.4        99       138        60
OIR    2025250     91400   18.1800 -113.8000       5.1       176       143        60
OIR    2025250     91400   18.1800 -114.3100       4.0       293       135        60
OIR    2025250     91400   18.1800 -114.3200       4.0       293       137        60
OIR    2025250     91400   18.1800 -114.3300       4.0       293       138        60
OIR    2025250     91400   18.1800 -114.3400       4.1       292       140        60
OIR    2025250     91400   18.1800 -114.3500       4.2       291       142        60
OIR    2025250     91400   18.1700 -108.8000      11.0        64       141        60
OIR    2025250     91400   18.1700 -108.8100      11.0        64       142        60
OIR    2025250     91400   18.1700 -109.0700      10.3        57       140        60
OIR    2025250     91400   18.1700 -109.0800      10.4        56       140        60
OIR    2025250     91400   18.1700 -109.0900      10.5        56       140        60
OIR    2025250     91400   18.1700 -109.1000      10.8        56       140        60
OIR    2025250     91400   18.1700 -109.1100      11.3        57       140        60
OIR    2025250     91400   18.1700 -109.1200      12.1        59       141        60
OIR    2025250     91400   18.1700 -109.1300      13.1        60       139        60
OIR    2025250     91400   18.1700 -109.1400      13.7        61       137        60
OIR    2025250     91400   18.1700 -109.1500      14.0        61       139        60
OIR    2025250     91400   18.1700 -109.1600      14.2        61       142        60
OIR    2025250     91400   18.1700 -110.8900      16.6        56       143        60
OIR    2025250     91400   18.1700 -110.9000      16.7        56       142        60
OIR    2025250     91400   18.1700 -110.9100      16.7        56       142        60
OIR    2025250     91400   18.1700 -110.9200      16.7        56       142        60
OIR    2025250     91400   18.1700 -110.9300      16.8        56       141        60
OIR    2025250     91400   18.1700 -110.9400      16.8        57       138        60
OIR    2025250     91400   18.1700 -110.9500      16.8        57       137        60
OIR    2025250     91400   18.1700 -110.9600      16.9        57       137        60
OIR    2025250     91400   18.1700 -110.9700      16.9        57       137        60
OIR    2025250     91400   18.1700 -110.9800      16.9        57       134        60
OIR    2025250     91400   18.1700 -110.9900      17.0        57       131        60
OIR    2025250     91400   18.1700 -111.0000      17.0        57       133        60
OIR    2025250     91400   18.1700 -111.0100      17.0        57       138        60
OIR    2025250     91400   18.1700 -111.0200      17.1        57       143        60
OIR    2025250     91400   18.1700 -111.0600      17.1        57       140        60
OIR    2025250     91400   18.1700 -111.0700      17.1        57       138        60
OIR    2025250     91400   18.1700 -111.0800      17.1        57       137        60
OIR    2025250     91400   18.1700 -111.0900      17.1        57       137        60
OIR    2025250     91400   18.1700 -111.2900      12.3        72       141        60
OIR    2025250     91400   18.1700 -111.3000      12.4        72       137        60
OIR    2025250     91400   18.1700 -111.3100      12.2        73       134        60
OIR    2025250     91400   18.1700 -111.3200      12.2        74       130        60
OIR    2025250     91400   18.1700 -111.3300      12.2        74       127        60
OIR    2025250     91400   18.1700 -111.3400      12.1        75       125        60
OIR    2025250     91400   18.1700 -111.3500      12.1        75       124        60
OIR    2025250     91400   18.1700 -111.3600      12.1        75       124        60
OIR    2025250     91400   18.1700 -111.3700      12.1        75       125        60
OIR    2025250     91400   18.1700 -111.3800      12.1        75       124        60
OIR    2025250     91400   18.1700 -111.3900      12.1        76       124        60
OIR    2025250     91400   18.1700 -111.4000      12.1        76       124        60
OIR    2025250     91400   18.1700 -111.4100      12.0        76       124        60
OIR    2025250     91400   18.1700 -111.4200      12.0        76       124        60
OIR    2025250     91400   18.1700 -111.4300      12.0        76       123        60
OIR    2025250     91400   18.1700 -111.4400      12.0        76       122        60
OIR    2025250     91400   18.1700 -111.4500      12.0        76       120        60
OIR    2025250     91400   18.1700 -111.4600      11.9        76       119        60
OIR    2025250     91400   18.1700 -111.4700      11.9        76       119        60
OIR    2025250     91400   18.1700 -111.4800      11.9        76       121        60
OIR    2025250     91400   18.1700 -111.4900      11.9        76       123        60
OIR    2025250     91400   18.1700 -111.5000      11.8        75       121        60
OIR    2025250     91400   18.1700 -111.5100      11.7        75       120        60
OIR    2025250     91400   18.1700 -111.5200      11.7        75       117        60
OIR    2025250     91400   18.1700 -111.5300      11.6        75       116        60
OIR    2025250     91400   18.1700 -111.5400      11.5        75       115        60
OIR    2025250     91400   18.1700 -111.5500      11.4        75       115        60
OIR    2025250     91400   18.1700 -111.5600      11.1        74       114        60
OIR    2025250     91400   18.1700 -111.5700      10.9        73       113        60
OIR    2025250     91400   18.1700 -111.5800      10.7        72       112        60
OIR    2025250     91400   18.1700 -111.5900      10.3        69       110        60
OIR    2025250     91400   18.1700 -111.6000      10.0        69       108        60
OIR    2025250     91400   18.1700 -111.6100       9.7        69       105        60
OIR    2025250     91400   18.1700 -111.6200       9.4        70       104        60
OIR    2025250     91400   18.1700 -111.6300       9.1        71       103        60
OIR    2025250     91400   18.1700 -111.6400       8.8        72       103        60
OIR    2025250     91400   18.1700 -111.6500       8.7        72       103        60
OIR    2025250     91400   18.1700 -111.6600       8.7        72       103        60
OIR    2025250     91400   18.1700 -111.6700       8.6        71       103        60
OIR    2025250     91400   18.1700 -111.6800       8.5        71       103        60
OIR    2025250     91400   18.1700 -111.6900       8.4        71       103        60
OIR    2025250     91400   18.1700 -111.7000       7.7        72       103        60
OIR    2025250     91400   18.1700 -111.7100       6.4        73       103        60
OIR    2025250     91400   18.1700 -111.7200       5.9        75       103        60
OIR    2025250     91400   18.1700 -111.7300       5.6        76       104        60
OIR    2025250     91400   18.1700 -111.7400       5.4        77       109        60
OIR    2025250     91400   18.1700 -111.7500       5.2        82       113        60
OIR    2025250     91400   18.1700 -111.7600       4.5        91       116        60
OIR    2025250     91400   18.1700 -111.7700       4.0       118       122        60
OIR    2025250     91400   18.1700 -111.7800       4.4       122       126        60
OIR    2025250     91400   18.1700 -111.7900       4.7       111       130        60
OIR    2025250     91400   18.1700 -111.8000       5.0        98       132        60
OIR    2025250     91400   18.1700 -111.8100       5.5        84       132        60
OIR    2025250     91400   18.1700 -111.8200       6.3        68       134        60
OIR    2025250     91400   18.1700 -111.8300       7.5        61       137        60
OIR    2025250     91400   18.1700 -111.8400       9.1        55       140        60
OIR    2025250     91400   18.1700 -111.9700       8.5        63       141        60
OIR    2025250     91400   18.1700 -111.9800       8.5        67       136        60
OIR    2025250     91400   18.1700 -111.9900       8.9        72       134        60
OIR    2025250     91400   18.1700 -112.0000       9.3        76       133        60
OIR    2025250     91400   18.1700 -112.0100       9.4        79       133        60
OIR    2025250     91400   18.1700 -112.0200       9.6        81       133        60
OIR    2025250     91400   18.1700 -112.0300       9.6        82       132        60
OIR    2025250     91400   18.1700 -112.0400       9.6        82       130        60
OIR    2025250     91400   18.1700 -112.0500       9.6        83       128        60
OIR    2025250     91400   18.1700 -112.0600       9.7        82       126        60
OIR    2025250     91400   18.1700 -112.0700       9.7        81       125        60
OIR    2025250     91400   18.1700 -112.0800       9.8        81       123        60
OIR    2025250     91400   18.1700 -112.0900       9.9        81       121        60
OIR    2025250     91400   18.1700 -112.1000      10.0        82       119        60
OIR    2025250     91400   18.1700 -112.1100      10.2        84       116        60
OIR    2025250     91400   18.1700 -112.1200      10.6        85       114        60
OIR    2025250     91400   18.1700 -112.1300      11.6        88       113        60
OIR    2025250     91400   18.1700 -112.1400      11.9        89       112        60
OIR    2025250     91400   18.1700 -112.1500      12.0        89       114        60
OIR    2025250     91400   18.1700 -112.1600      12.1        89       116        60
OIR    2025250     91400   18.1700 -112.1700      12.1        89       119        60
OIR    2025250     91400   18.1700 -112.1800      12.2        89       121        60
OIR    2025250     91400   18.1700 -112.1900      12.2        89       124        60
OIR    2025250     91400   18.1700 -112.2000      12.3        89       125        60
OIR    2025250     91400   18.1700 -112.2100      12.3        89       125        60
OIR    2025250     91400   18.1700 -112.2200      12.3        89       124        60
OIR    2025250     91400   18.1700 -112.2300      12.3        89       122        60
OIR    2025250     91400   18.1700 -112.2400      12.3        89       120        60
OIR    2025250     91400   18.1700 -112.2500      12.3        89       119        60
OIR    2025250     91400   18.1700 -112.2600      12.3        89       116        60
OIR    2025250     91400   18.1700 -112.2700      12.3        89       117        60
OIR    2025250     91400   18.1700 -112.2800      12.3        89       120        60
OIR    2025250     91400   18.1700 -112.2900      12.3        89       122        60
OIR    2025250     91400   18.1700 -112.3000      12.2        89       124        60
OIR    2025250     91400   18.1700 -112.3100      12.2        89       126        60
OIR    2025250     91400   18.1700 -112.3200      12.2        89       128        60
OIR    2025250     91400   18.1700 -112.3300      12.1        90       130        60
OIR    2025250     91400   18.1700 -112.3400      11.9        91       131        60
OIR    2025250     91400   18.1700 -112.3500      11.8        92       131        60
OIR    2025250     91400   18.1700 -112.3600      11.5        93       131        60
OIR    2025250     91400   18.1700 -112.3700      11.2        96       129        60
OIR    2025250     91400   18.1700 -112.3800      10.7       102       128        60
OIR    2025250     91400   18.1700 -112.3900      10.6       102       132        60
OIR    2025250     91400   18.1700 -112.4000      10.6       103       135        60
OIR    2025250     91400   18.1700 -112.4100      10.5       104       136        60
OIR    2025250     91400   18.1700 -112.4200      10.4       104       136        60
OIR    2025250     91400   18.1700 -112.4300      10.3       105       137        60
OIR    2025250     91400   18.1700 -112.4400       9.9       107       137        60
OIR    2025250     91400   18.1700 -112.4500       9.3       111       138        60
OIR    2025250     91400   18.1700 -112.4600       8.7       114       136        60
OIR    2025250     91400   18.1700 -112.4700       8.3       116       135        60
OIR    2025250     91400   18.1700 -112.4800       8.1       116       135        60
OIR    2025250     91400   18.1700 -112.4900       7.8       117       134        60
OIR    2025250     91400   18.1700 -112.5000       6.7       118       135        60
OIR    2025250     91400   18.1700 -112.5100       5.8       119       136        60
OIR    2025250     91400   18.1700 -112.5200       5.7       119       137        60
OIR    2025250     91400   18.1700 -112.5300       5.6       119       137        60
OIR    2025250     91400   18.1700 -112.5400       5.5       119       138        60
OIR    2025250     91400   18.1700 -112.5500       5.4       119       134        60
OIR    2025250     91400   18.1700 -112.5600       5.4       120       130        60
OIR    2025250     91400   18.1700 -112.5700       5.3       120       131        60
OIR    2025250     91400   18.1700 -112.5800       5.2       121       134        60
OIR    2025250     91400   18.1700 -112.5900       5.2       121       135        60
OIR    2025250     91400   18.1700 -112.6000       5.1       121       132        60
OIR    2025250     91400   18.1700 -112.6100       5.0       121       131        60
OIR    2025250     91400   18.1700 -112.6200       5.0       122       132        60
OIR    2025250     91400   18.1700 -112.6300       4.9       123       133        60
OIR    2025250     91400   18.1700 -112.6400       4.8       125       133        60
OIR    2025250     91400   18.1700 -112.6500       4.7       129       132        60
OIR    2025250     91400   18.1700 -112.6600       4.6       131       132        60
OIR    2025250     91400   18.1700 -112.6700       4.6       132       134        60
OIR    2025250     91400   18.1700 -112.6800       4.6       134       135        60
OIR    2025250     91400   18.1700 -112.6900       4.6       137       138        60
OIR    2025250     91400   18.1700 -112.7000       4.6       140       140        60
OIR    2025250     91400   18.1700 -112.7100       4.6       142       142        60
OIR    2025250     91400   18.1700 -112.8100       5.0       144       144        60
OIR    2025250     91400   18.1700 -112.8200       5.0       142       142        60
OIR    2025250     91400   18.1700 -112.8300       5.1       141       140        60
OIR    2025250     91400   18.1700 -112.8400       5.3       140       139        60
OIR    2025250     91400   18.1700 -112.8500       5.5       137       140        60
OIR    2025250     91400   18.1700 -112.8600       5.6       134       141        60
OIR    2025250     91400   18.1700 -112.8700       5.7       130       141        60
OIR    2025250     91400   18.1700 -112.8800       5.6       129       140        60
OIR    2025250     91400   18.1700 -112.8900       5.7       126       139        60
OIR    2025250     91400   18.1700 -112.9000       5.7       124       139        60
OIR    2025250     91400   18.1700 -112.9100       5.6       121       139        60
OIR    2025250     91400   18.1700 -112.9200       5.6       120       138        60
OIR    2025250     91400   18.1700 -112.9300       5.6       119       137        60
OIR    2025250     91400   18.1700 -112.9400       5.6       120       136        60
OIR    2025250     91400   18.1700 -112.9500       5.9       119       134        60
OIR    2025250     91400   18.1700 -112.9600       5.9       121       136        60
OIR    2025250     91400   18.1700 -112.9700       6.2       119       142        60
OIR    2025250     91400   18.1700 -113.3100       4.4        86       135        60
OIR    2025250     91400   18.1700 -113.3200       5.1        94       134        60
OIR    2025250     91400   18.1700 -113.3300       5.6        98       135        60
OIR    2025250     91400   18.1700 -113.3400       5.9       100       135        60
OIR    2025250     91400   18.1700 -113.3500       6.0       101       136        60
OIR    2025250     91400   18.1700 -113.3600       6.1       101       136        60
OIR    2025250     91400   18.1700 -113.3700       6.2       100       136        60
OIR    2025250     91400   18.1700 -113.3800       6.3       100       136        60
OIR    2025250     91400   18.1700 -113.3900       6.3       100       135        60
OIR    2025250     91400   18.1700 -113.4000       6.4       100       140        60
OIR    2025250     91400   18.1700 -114.3000       4.0       294       136        60
OIR    2025250     91400   18.1700 -114.3100       4.0       294       138        60
OIR    2025250     91400   18.1700 -114.3200       4.1       293       141        60
OIR    2025250     91400   18.1700 -114.3300       4.1       293       142        60
OIR    2025250     91400   18.1700 -114.3400       4.1       292       142        60
OIR    2025250     91400   18.1700 -114.3500       4.1       292       144        60
OIR    2025250     91400   18.1700 -114.4800       4.4       278       144        60
OIR    2025250     91400   18.1600 -109.1400      12.3        60       141        60
OIR    2025250     91400   18.1600 -109.1500      12.8        61       141        60
OIR    2025250     91400   18.1600 -110.9000      16.7        56       143        60
OIR    2025250     91400   18.1600 -110.9100      16.7        56       142        60
OIR    2025250     91400   18.1600 -110.9200      16.7        56       141        60
OIR    2025250     91400   18.1600 -110.9300      16.7        57       140        60
OIR    2025250     91400   18.1600 -110.9400      16.8        57       140        60
OIR    2025250     91400   18.1600 -110.9500      16.8        57       139        60
OIR    2025250     91400   18.1600 -110.9600      16.9        57       138        60
OIR    2025250     91400   18.1600 -110.9700      16.9        57       137        60
OIR    2025250     91400   18.1600 -110.9800      16.9        57       135        60
OIR    2025250     91400   18.1600 -110.9900      17.0        57       131        60
OIR    2025250     91400   18.1600 -111.0000      17.0        57       130        60
OIR    2025250     91400   18.1600 -111.0100      17.1        57       136        60
OIR    2025250     91400   18.1600 -111.0200      17.1        57       141        60
OIR    2025250     91400   18.1600 -111.0300      17.1        57       144        60
OIR    2025250     91400   18.1600 -111.0600      17.1        57       141        60
OIR    2025250     91400   18.1600 -111.0700      17.1        57       138        60
OIR    2025250     91400   18.1600 -111.0800      17.1        57       138        60
OIR    2025250     91400   18.1600 -111.0900      17.1        57       138        60
OIR    2025250     91400   18.1600 -111.3000      12.6        71       142        60
OIR    2025250     91400   18.1600 -111.3100      12.4        72       139        60
OIR    2025250     91400   18.1600 -111.3200      12.3        73       136        60
OIR    2025250     91400   18.1600 -111.3300      12.2        73       133        60
OIR    2025250     91400   18.1600 -111.3400      12.2        74       131        60
OIR    2025250     91400   18.1600 -111.3500      12.2        75       129        60
OIR    2025250     91400   18.1600 -111.3600      12.2        75       129        60
OIR    2025250     91400   18.1600 -111.3700      12.1        75       129        60
OIR    2025250     91400   18.1600 -111.3800      12.1        75       128        60
OIR    2025250     91400   18.1600 -111.3900      12.1        75       128        60
OIR    2025250     91400   18.1600 -111.4000      12.1        75       127        60
OIR    2025250     91400   18.1600 -111.4100      12.1        75       127        60
OIR    2025250     91400   18.1600 -111.4200      12.0        75       128        60
OIR    2025250     91400   18.1600 -111.4300      12.0        75       127        60
OIR    2025250     91400   18.1600 -111.4400      12.0        75       126        60
OIR    2025250     91400   18.1600 -111.4500      12.0        75       125        60
OIR    2025250     91400   18.1600 -111.4600      12.0        75       123        60
OIR    2025250     91400   18.1600 -111.4700      11.9        75       121        60
OIR    2025250     91400   18.1600 -111.4800      11.9        75       123        60
OIR    2025250     91400   18.1600 -111.4900      11.8        74       126        60
OIR    2025250     91400   18.1600 -111.5000      11.8        74       125        60
OIR    2025250     91400   18.1600 -111.5100      11.7        74       124        60
OIR    2025250     91400   18.1600 -111.5200      11.6        74       121        60
OIR    2025250     91400   18.1600 -111.5300      11.5        74       119        60
OIR    2025250     91400   18.1600 -111.5400      11.5        74       116        60
OIR    2025250     91400   18.1600 -111.5500      11.3        73       116        60
OIR    2025250     91400   18.1600 -111.5600      11.0        72       116        60
OIR    2025250     91400   18.1600 -111.5700      10.8        71       114        60
OIR    2025250     91400   18.1600 -111.5800      10.7        69       112        60
OIR    2025250     91400   18.1600 -111.5900      10.5        68       110        60
OIR    2025250     91400   18.1600 -111.6000      10.3        68       108        60
OIR    2025250     91400   18.1600 -111.6100      10.0        69       105        60
OIR    2025250     91400   18.1600 -111.6200       9.7        69       104        60
OIR    2025250     91400   18.1600 -111.6300       9.3        71       104        60
OIR    2025250     91400   18.1600 -111.6400       8.9        71       104        60
OIR    2025250     91400   18.1600 -111.6500       8.8        71       103        60
OIR    2025250     91400   18.1600 -111.6600       8.7        71       103        60
OIR    2025250     91400   18.1600 -111.6700       8.6        71       103        60
OIR    2025250     91400   18.1600 -111.6800       8.5        71       103        60
OIR    2025250     91400   18.1600 -111.6900       8.4        71       103        60
OIR    2025250     91400   18.1600 -111.7000       7.8        71       103        60
OIR    2025250     91400   18.1600 -111.7100       6.8        72       103        60
OIR    2025250     91400   18.1600 -111.7200       6.2        73       104        60
OIR    2025250     91400   18.1600 -111.7300       5.9        74       105        60
OIR    2025250     91400   18.1600 -111.7400       5.8        76       109        60
OIR    2025250     91400   18.1600 -111.7500       5.8        78       112        60
OIR    2025250     91400   18.1600 -111.7600       5.2        81       116        60
OIR    2025250     91400   18.1600 -111.7700       5.0        84       119        60
OIR    2025250     91400   18.1600 -111.7800       4.9        92       123        60
OIR    2025250     91400   18.1600 -111.7900       5.1        93       128        60
OIR    2025250     91400   18.1600 -111.8000       5.4        86       131        60
OIR    2025250     91400   18.1600 -111.8100       6.1        77       132        60
OIR    2025250     91400   18.1600 -111.8200       6.6        65       133        60
OIR    2025250     91400   18.1600 -111.8300       7.3        60       138        60
OIR    2025250     91400   18.1600 -111.8400       8.7        56       142        60
OIR    2025250     91400   18.1600 -111.9700       8.5        62       141        60
OIR    2025250     91400   18.1600 -111.9800       8.5        63       136        60
OIR    2025250     91400   18.1600 -111.9900       8.8        71       134        60
OIR    2025250     91400   18.1600 -112.0000       9.2        77       132        60
OIR    2025250     91400   18.1600 -112.0100       9.4        80       131        60
OIR    2025250     91400   18.1600 -112.0200       9.6        82       130        60
OIR    2025250     91400   18.1600 -112.0300       9.6        83       130        60
OIR    2025250     91400   18.1600 -112.0400       9.7        83       129        60
OIR    2025250     91400   18.1600 -112.0500       9.7        83       128        60
OIR    2025250     91400   18.1600 -112.0600       9.7        83       125        60
OIR    2025250     91400   18.1600 -112.0700       9.8        82       123        60
OIR    2025250     91400   18.1600 -112.0800       9.9        82       121        60
OIR    2025250     91400   18.1600 -112.0900      10.0        83       119        60
OIR    2025250     91400   18.1600 -112.1000      10.2        84       117        60
OIR    2025250     91400   18.1600 -112.1100      10.3        85       115        60
OIR    2025250     91400   18.1600 -112.1200      10.4        85       113        60
OIR    2025250     91400   18.1600 -112.1300      11.1        88       112        60
OIR    2025250     91400   18.1600 -112.1400      11.5        88       111        60
OIR    2025250     91400   18.1600 -112.1500      11.7        89       113        60
OIR    2025250     91400   18.1600 -112.1600      11.9        89       116        60
OIR    2025250     91400   18.1600 -112.1700      12.0        89       120        60
OIR    2025250     91400   18.1600 -112.1800      12.2        89       123        60
OIR    2025250     91400   18.1600 -112.1900      12.2        89       125        60
OIR    2025250     91400   18.1600 -112.2000      12.3        89       127        60
OIR    2025250     91400   18.1600 -112.2100      12.3        89       128        60
OIR    2025250     91400   18.1600 -112.2200      12.3        89       127        60
OIR    2025250     91400   18.1600 -112.2300      12.3        89       123        60
OIR    2025250     91400   18.1600 -112.2400      12.3        89       120        60
OIR    2025250     91400   18.1600 -112.2500      12.4        89       116        60
OIR    2025250     91400   18.1600 -112.2600      12.3        89       114        60
OIR    2025250     91400   18.1600 -112.2700      12.3        89       113        60
OIR    2025250     91400   18.1600 -112.2800      12.3        89       115        60
OIR    2025250     91400   18.1600 -112.2900      12.3        89       116        60
OIR    2025250     91400   18.1600 -112.3000      12.2        89       120        60
OIR    2025250     91400   18.1600 -112.3100      12.2        89       123        60
OIR    2025250     91400   18.1600 -112.3200      12.2        89       125        60
OIR    2025250     91400   18.1600 -112.3300      12.1        90       128        60
OIR    2025250     91400   18.1600 -112.3400      11.9        91       129        60
OIR    2025250     91400   18.1600 -112.3500      11.7        92       130        60
OIR    2025250     91400   18.1600 -112.3600      11.5        95       130        60
OIR    2025250     91400   18.1600 -112.3700      11.1        98       131        60
OIR    2025250     91400   18.1600 -112.3800      10.7       102       132        60
OIR    2025250     91400   18.1600 -112.3900      10.7       103       133        60
OIR    2025250     91400   18.1600 -112.4000      10.6       103       135        60
OIR    2025250     91400   18.1600 -112.4100      10.5       104       136        60
OIR    2025250     91400   18.1600 -112.4200      10.4       104       137        60
OIR    2025250     91400   18.1600 -112.4300      10.3       105       137        60
OIR    2025250     91400   18.1600 -112.4400      10.1       106       137        60
OIR    2025250     91400   18.1600 -112.4500       9.7       108       138        60
OIR    2025250     91400   18.1600 -112.4600       9.1       111       136        60
OIR    2025250     91400   18.1600 -112.4700       8.4       114       133        60
OIR    2025250     91400   18.1600 -112.4800       8.0       115       133        60
OIR    2025250     91400   18.1600 -112.4900       7.7       115       133        60
OIR    2025250     91400   18.1600 -112.5000       6.8       117       134        60
OIR    2025250     91400   18.1600 -112.5100       5.8       119       135        60
OIR    2025250     91400   18.1600 -112.5200       5.7       120       137        60
OIR    2025250     91400   18.1600 -112.5300       5.6       120       136        60
OIR    2025250     91400   18.1600 -112.5400       5.5       120       135        60
OIR    2025250     91400   18.1600 -112.5500       5.5       120       134        60
OIR    2025250     91400   18.1600 -112.5600       5.4       120       131        60
OIR    2025250     91400   18.1600 -112.5700       5.3       121       131        60
OIR    2025250     91400   18.1600 -112.5800       5.2       121       134        60
OIR    2025250     91400   18.1600 -112.5900       5.2       121       136        60
OIR    2025250     91400   18.1600 -112.6000       5.1       122       133        60
OIR    2025250     91400   18.1600 -112.6100       5.1       122       130        60
OIR    2025250     91400   18.1600 -112.6200       5.0       123       132        60
OIR    2025250     91400   18.1600 -112.6300       4.9       125       133        60
OIR    2025250     91400   18.1600 -112.6400       4.8       128       134        60
OIR    2025250     91400   18.1600 -112.6500       4.7       130       133        60
OIR    2025250     91400   18.1600 -112.6600       4.6       132       132        60
OIR    2025250     91400   18.1600 -112.6700       4.5       134       133        60
OIR    2025250     91400   18.1600 -112.6800       4.5       136       135        60
OIR    2025250     91400   18.1600 -112.6900       4.5       139       137        60
OIR    2025250     91400   18.1600 -112.7000       4.5       142       138        60
OIR    2025250     91400   18.1600 -112.7100       4.6       143       140        60
OIR    2025250     91400   18.1600 -112.7200       4.6       145       141        60
OIR    2025250     91400   18.1600 -112.7300       4.6       145       143        60
OIR    2025250     91400   18.1600 -112.8300       4.9       145       144        60
OIR    2025250     91400   18.1600 -112.8400       5.0       144       141        60
OIR    2025250     91400   18.1600 -112.8500       5.0       142       140        60
OIR    2025250     91400   18.1600 -112.8600       5.1       139       139        60
OIR    2025250     91400   18.1600 -112.8700       5.1       135       138        60
OIR    2025250     91400   18.1600 -112.8800       5.1       133       137        60
OIR    2025250     91400   18.1600 -112.8900       5.0       129       137        60
OIR    2025250     91400   18.1600 -112.9000       5.1       124       140        60
OIR    2025250     91400   18.1600 -112.9100       5.2       121       143        60
OIR    2025250     91400   18.1600 -112.9200       5.3       120       143        60
OIR    2025250     91400   18.1600 -112.9300       5.4       119       143        60
OIR    2025250     91400   18.1600 -112.9400       5.4       121       141        60
OIR    2025250     91400   18.1600 -112.9500       5.5       121       137        60
OIR    2025250     91400   18.1600 -112.9600       5.4       121       134        60
OIR    2025250     91400   18.1600 -112.9700       5.5       120       138        60
OIR    2025250     91400   18.1600 -112.9800       5.4       117       142        60
OIR    2025250     91400   18.1600 -112.9900       5.6       113       145        60
OIR    2025250     91400   18.1600 -113.3100       4.4        88       132        60
OIR    2025250     91400   18.1600 -113.3200       4.9        94       132        60
OIR    2025250     91400   18.1600 -113.3300       5.3        98       132        60
OIR    2025250     91400   18.1600 -113.3400       5.6       100       132        60
OIR    2025250     91400   18.1600 -113.3500       5.8       101       133        60
OIR    2025250     91400   18.1600 -113.3600       6.0       101       133        60
OIR    2025250     91400   18.1600 -113.3700       6.1       101       133        60
OIR    2025250     91400   18.1600 -113.3800       6.2       101       133        60
OIR    2025250     91400   18.1600 -113.3900       6.3       101       133        60
OIR    2025250     91400   18.1600 -113.4000       6.4       101       136        60
OIR    2025250     91400   18.1600 -113.4100       6.4       101       142        60
OIR    2025250     91400   18.1600 -114.2900       4.0       294       141        60
OIR    2025250     91400   18.1600 -114.3000       4.1       294       140        60
OIR    2025250     91400   18.1600 -114.3100       4.1       294       141        60
OIR    2025250     91400   18.1500 -109.1500      11.5        61       142        60
OIR    2025250     91400   18.1500 -110.5500      16.4        51       143        60
OIR    2025250     91400   18.1500 -110.5600      16.5        51       143        60
OIR    2025250     91400   18.1500 -110.5700      16.5        52       142        60
OIR    2025250     91400   18.1500 -110.9100      16.7        56       144        60
OIR    2025250     91400   18.1500 -110.9200      16.7        57       141        60
OIR    2025250     91400   18.1500 -110.9300      16.7        57       139        60
OIR    2025250     91400   18.1500 -110.9400      16.8        57       139        60
OIR    2025250     91400   18.1500 -110.9500      16.8        57       140        60
OIR    2025250     91400   18.1500 -110.9600      16.9        57       139        60
OIR    2025250     91400   18.1500 -110.9700      16.9        57       138        60
OIR    2025250     91400   18.1500 -110.9800      17.0        57       136        60
OIR    2025250     91400   18.1500 -110.9900      17.0        57       134        60
OIR    2025250     91400   18.1500 -111.0000      17.0        57       131        60
OIR    2025250     91400   18.1500 -111.0100      17.1        57       135        60
OIR    2025250     91400   18.1500 -111.0200      17.1        57       140        60
OIR    2025250     91400   18.1500 -111.0300      17.1        57       142        60
OIR    2025250     91400   18.1500 -111.0600      17.1        57       142        60
OIR    2025250     91400   18.1500 -111.0700      17.1        57       139        60
OIR    2025250     91400   18.1500 -111.0800      17.1        57       139        60
OIR    2025250     91400   18.1500 -111.0900      17.1        57       139        60
OIR    2025250     91400   18.1500 -111.1000      17.0        57       143        60
OIR    2025250     91400   18.1500 -111.3000      13.0        69       144        60
OIR    2025250     91400   18.1500 -111.3100      12.9        68       142        60
OIR    2025250     91400   18.1500 -111.3200      12.8        68       139        60
OIR    2025250     91400   18.1500 -111.3300      12.8        70       137        60
OIR    2025250     91400   18.1500 -111.3400      12.7        71       135        60
OIR    2025250     91400   18.1500 -111.3500      12.6        72       133        60
OIR    2025250     91400   18.1500 -111.3600      12.4        74       132        60
OIR    2025250     91400   18.1500 -111.3700      12.2        75       133        60
OIR    2025250     91400   18.1500 -111.3800      12.2        75       132        60
OIR    2025250     91400   18.1500 -111.3900      12.3        74       131        60
OIR    2025250     91400   18.1500 -111.4000      12.3        74       130        60
OIR    2025250     91400   18.1500 -111.4100      12.3        74       130        60
OIR    2025250     91400   18.1500 -111.4200      12.2        73       131        60
OIR    2025250     91400   18.1500 -111.4300      12.2        73       130        60
OIR    2025250     91400   18.1500 -111.4400      12.2        73       129        60
OIR    2025250     91400   18.1500 -111.4500      12.2        73       128        60
OIR    2025250     91400   18.1500 -111.4600      12.1        73       127        60
OIR    2025250     91400   18.1500 -111.4700      12.0        73       126        60
OIR    2025250     91400   18.1500 -111.4800      11.9        73       125        60
OIR    2025250     91400   18.1500 -111.4900      11.8        73       125        60
OIR    2025250     91400   18.1500 -111.5000      11.7        73       125        60
OIR    2025250     91400   18.1500 -111.5100      11.7        73       125        60
OIR    2025250     91400   18.1500 -111.5200      11.6        73       125        60
OIR    2025250     91400   18.1500 -111.5300      11.5        73       122        60
OIR    2025250     91400   18.1500 -111.5400      11.4        72       119        60
OIR    2025250     91400   18.1500 -111.5500      11.2        72       117        60
OIR    2025250     91400   18.1500 -111.5600      11.0        71       116        60
OIR    2025250     91400   18.1500 -111.5700      10.8        69       116        60
OIR    2025250     91400   18.1500 -111.5800      10.7        68       114        60
OIR    2025250     91400   18.1500 -111.5900      10.7        68       112        60
OIR    2025250     91400   18.1500 -111.6000      10.5        68       109        60
OIR    2025250     91400   18.1500 -111.6100      10.3        68       107        60
OIR    2025250     91400   18.1500 -111.6200       9.9        69       105        60
OIR    2025250     91400   18.1500 -111.6300       9.6        70       104        60
OIR    2025250     91400   18.1500 -111.6400       9.2        71       104        60
OIR    2025250     91400   18.1500 -111.6500       8.9        71       104        60
OIR    2025250     91400   18.1500 -111.6600       8.8        71       103        60
OIR    2025250     91400   18.1500 -111.6700       8.7        71       103        60
OIR    2025250     91400   18.1500 -111.6800       8.6        70       103        60
OIR    2025250     91400   18.1500 -111.6900       8.4        70       103        60
OIR    2025250     91400   18.1500 -111.7000       7.9        70       103        60
OIR    2025250     91400   18.1500 -111.7100       7.2        70       104        60
OIR    2025250     91400   18.1500 -111.7200       6.7        71       104        60
OIR    2025250     91400   18.1500 -111.7300       6.4        72       105        60
OIR    2025250     91400   18.1500 -111.7400       6.3        73       109        60
OIR    2025250     91400   18.1500 -111.7500       6.3        74       112        60
OIR    2025250     91400   18.1500 -111.7600       6.3        74       115        60
OIR    2025250     91400   18.1500 -111.7700       6.2        74       117        60
OIR    2025250     91400   18.1500 -111.7800       6.3        75       120        60
OIR    2025250     91400   18.1500 -111.7900       6.3        75       125        60
OIR    2025250     91400   18.1500 -111.8000       6.3        71       130        60
OIR    2025250     91400   18.1500 -111.8100       7.0        67       131        60
OIR    2025250     91400   18.1500 -111.8200       7.0        62       132        60
OIR    2025250     91400   18.1500 -111.8300       7.2        60       137        60
OIR    2025250     91400   18.1500 -111.9700       8.4        62       144        60
OIR    2025250     91400   18.1500 -111.9800       8.4        64       139        60
OIR    2025250     91400   18.1500 -111.9900       8.8        72       136        60
OIR    2025250     91400   18.1500 -112.0000       9.2        79       135        60
OIR    2025250     91400   18.1500 -112.0100       9.5        82       134        60
OIR    2025250     91400   18.1500 -112.0200       9.6        83       132        60
OIR    2025250     91400   18.1500 -112.0300       9.7        83       131        60
OIR    2025250     91400   18.1500 -112.0400       9.7        84       130        60
OIR    2025250     91400   18.1500 -112.0500       9.8        84       129        60
OIR    2025250     91400   18.1500 -112.0600       9.9        84       128        60
OIR    2025250     91400   18.1500 -112.0700      10.0        84       126        60
OIR    2025250     91400   18.1500 -112.0800      10.0        84       123        60
OIR    2025250     91400   18.1500 -112.0900      10.1        84       120        60
OIR    2025250     91400   18.1500 -112.1000      10.2        85       117        60
OIR    2025250     91400   18.1500 -112.1100      10.3        85       116        60
OIR    2025250     91400   18.1500 -112.1200      10.3        85       114        60
OIR    2025250     91400   18.1500 -112.1300      10.6        87       113        60
OIR    2025250     91400   18.1500 -112.1400      11.0        88       115        60
OIR    2025250     91400   18.1500 -112.1500      11.4        88       116        60
OIR    2025250     91400   18.1500 -112.1600      11.6        88       119        60
OIR    2025250     91400   18.1500 -112.1700      11.8        89       123        60
OIR    2025250     91400   18.1500 -112.1800      12.0        89       125        60
OIR    2025250     91400   18.1500 -112.1900      12.2        88       126        60
OIR    2025250     91400   18.1500 -112.2000      12.3        89       128        60
OIR    2025250     91400   18.1500 -112.2100      12.3        89       128        60
OIR    2025250     91400   18.1500 -112.2200      12.3        88       129        60
OIR    2025250     91400   18.1500 -112.2300      12.4        88       124        60
OIR    2025250     91400   18.1500 -112.2400      12.4        88       119        60
OIR    2025250     91400   18.1500 -112.2500      12.4        88       116        60
OIR    2025250     91400   18.1500 -112.2600      12.3        89       112        60
OIR    2025250     91400   18.1500 -112.2700      12.3        89       110        60
OIR    2025250     91400   18.1500 -112.2800      12.3        89       112        60
OIR    2025250     91400   18.1500 -112.2900      12.3        89       114        60
OIR    2025250     91400   18.1500 -112.3000      12.2        89       116        60
OIR    2025250     91400   18.1500 -112.3100      12.2        89       120        60
OIR    2025250     91400   18.1500 -112.3200      12.2        90       123        60
OIR    2025250     91400   18.1500 -112.3300      12.1        91       126        60
OIR    2025250     91400   18.1500 -112.3400      11.9        93       128        60
OIR    2025250     91400   18.1500 -112.3500      11.7        94       128        60
OIR    2025250     91400   18.1500 -112.3600      11.4        97       129        60
OIR    2025250     91400   18.1500 -112.3700      11.0       100       131        60
OIR    2025250     91400   18.1500 -112.3800      10.8       103       134        60
OIR    2025250     91400   18.1500 -112.3900      10.7       103       135        60
OIR    2025250     91400   18.1500 -112.4000      10.7       104       135        60
OIR    2025250     91400   18.1500 -112.4100      10.6       104       136        60
OIR    2025250     91400   18.1500 -112.4200      10.5       105       137        60
OIR    2025250     91400   18.1500 -112.4300      10.3       105       137        60
OIR    2025250     91400   18.1500 -112.4400      10.1       106       137        60
OIR    2025250     91400   18.1500 -112.4500      10.0       107       138        60
OIR    2025250     91400   18.1500 -112.4600       9.4       109       135        60
OIR    2025250     91400   18.1500 -112.4700       8.5       112       132        60
OIR    2025250     91400   18.1500 -112.4800       7.9       113       130        60
OIR    2025250     91400   18.1500 -112.4900       7.7       114       131        60
OIR    2025250     91400   18.1500 -112.5000       6.8       116       133        60
OIR    2025250     91400   18.1500 -112.5100       5.8       119       135        60
OIR    2025250     91400   18.1500 -112.5200       5.7       120       137        60
OIR    2025250     91400   18.1500 -112.5300       5.7       120       135        60
OIR    2025250     91400   18.1500 -112.5400       5.6       121       133        60
OIR    2025250     91400   18.1500 -112.5500       5.5       121       132        60
OIR    2025250     91400   18.1500 -112.5600       5.4       121       132        60
OIR    2025250     91400   18.1500 -112.5700       5.3       122       132        60
OIR    2025250     91400   18.1500 -112.5800       5.2       122       134        60
OIR    2025250     91400   18.1500 -112.5900       5.2       122       136        60
OIR    2025250     91400   18.1500 -112.6000       5.1       123       133        60
OIR    2025250     91400   18.1500 -112.6100       5.0       124       130        60
OIR    2025250     91400   18.1500 -112.6200       5.0       125       131        60
OIR    2025250     91400   18.1500 -112.6300       4.9       127       133        60
OIR    2025250     91400   18.1500 -112.6400       4.8       130       133        60
OIR    2025250     91400   18.1500 -112.6500       4.7       131       132        60
OIR    2025250     91400   18.1500 -112.6600       4.6       133       131        60
OIR    2025250     91400   18.1500 -112.6700       4.5       136       131        60
OIR    2025250     91400   18.1500 -112.6800       4.5       138       132        60
OIR    2025250     91400   18.1500 -112.6900       4.5       140       134        60
OIR    2025250     91400   18.1500 -112.7000       4.6       143       136        60
OIR    2025250     91400   18.1500 -112.7100       4.6       144       137        60
OIR    2025250     91400   18.1500 -112.7200       4.6       145       137        60
OIR    2025250     91400   18.1500 -112.7300       4.7       146       138        60
OIR    2025250     91400   18.1500 -112.7400       4.7       147       143        60
OIR    2025250     91400   18.1500 -112.8500       4.8       144       144        60
OIR    2025250     91400   18.1500 -112.8600       4.8       142       141        60
OIR    2025250     91400   18.1500 -112.8700       4.8       139       139        60
OIR    2025250     91400   18.1500 -112.8800       4.7       136       138        60
OIR    2025250     91400   18.1500 -112.8900       4.7       132       137        60
OIR    2025250     91400   18.1500 -112.9000       4.8       128       138        60
OIR    2025250     91400   18.1500 -112.9100       4.9       125       141        60
OIR    2025250     91400   18.1500 -112.9200       5.1       122       143        60
OIR    2025250     91400   18.1500 -112.9500       5.3       121       141        60
OIR    2025250     91400   18.1500 -112.9600       5.3       121       137        60
OIR    2025250     91400   18.1500 -112.9700       5.3       120       138        60
OIR    2025250     91400   18.1500 -112.9800       5.2       118       139        60
OIR    2025250     91400   18.1500 -112.9900       5.2       114       141        60
OIR    2025250     91400   18.1500 -113.0000       5.4       104       143        60
OIR    2025250     91400   18.1500 -113.3100       4.4        90       130        60
OIR    2025250     91400   18.1500 -113.3200       4.7        94       130        60
OIR    2025250     91400   18.1500 -113.3300       5.0        97       130        60
OIR    2025250     91400   18.1500 -113.3400       5.3       100       130        60
OIR    2025250     91400   18.1500 -113.3500       5.6       102       131        60
OIR    2025250     91400   18.1500 -113.3600       5.8       102       131        60
OIR    2025250     91400   18.1500 -113.3700       6.0       101       130        60
OIR    2025250     91400   18.1500 -113.3800       6.2       101       131        60
OIR    2025250     91400   18.1500 -113.3900       6.3       101       132        60
OIR    2025250     91400   18.1500 -113.4000       6.4       101       134        60
OIR    2025250     91400   18.1500 -113.4100       6.4       101       140        60
OIR    2025250     91400   18.1400 -109.1500      10.7        62       142        60
OIR    2025250     91400   18.1400 -109.2000      13.4        67       142        60
OIR    2025250     91400   18.1400 -110.5500      16.5        51       143        60
OIR    2025250     91400   18.1400 -110.5600      16.5        52       142        60
OIR    2025250     91400   18.1400 -110.5700      16.5        52       142        60
OIR    2025250     91400   18.1400 -110.9200      16.7        57       142        60
OIR    2025250     91400   18.1400 -110.9300      16.7        57       138        60
OIR    2025250     91400   18.1400 -110.9400      16.8        57       139        60
OIR    2025250     91400   18.1400 -110.9500      16.8        57       140        60
OIR    2025250     91400   18.1400 -110.9600      16.9        57       140        60
OIR    2025250     91400   18.1400 -110.9700      16.9        57       139        60
OIR    2025250     91400   18.1400 -110.9800      17.0        57       138        60
OIR    2025250     91400   18.1400 -110.9900      17.0        57       138        60
OIR    2025250     91400   18.1400 -111.0000      17.0        57       137        60
OIR    2025250     91400   18.1400 -111.0100      17.1        57       138        60
OIR    2025250     91400   18.1400 -111.0200      17.1        57       141        60
OIR    2025250     91400   18.1400 -111.0300      17.1        57       143        60
OIR    2025250     91400   18.1400 -111.0600      17.1        57       142        60
OIR    2025250     91400   18.1400 -111.0700      17.1        57       139        60
OIR    2025250     91400   18.1400 -111.0800      17.1        57       139        60
OIR    2025250     91400   18.1400 -111.0900      17.1        57       139        60
OIR    2025250     91400   18.1400 -111.1000      17.1        57       141        60
OIR    2025250     91400   18.1400 -111.3200      13.9        63       143        60
OIR    2025250     91400   18.1400 -111.3300      14.2        62       141        60
OIR    2025250     91400   18.1400 -111.3400      14.0        63       139        60
OIR    2025250     91400   18.1400 -111.3500      13.8        65       136        60
OIR    2025250     91400   18.1400 -111.3600      13.3        68       135        60
OIR    2025250     91400   18.1400 -111.3700      12.8        71       136        60
OIR    2025250     91400   18.1400 -111.3800      12.7        71       136        60
OIR    2025250     91400   18.1400 -111.3900      12.7        71       135        60
OIR    2025250     91400   18.1400 -111.4000      12.6        71       134        60
OIR    2025250     91400   18.1400 -111.4100      12.5        71       134        60
OIR    2025250     91400   18.1400 -111.4200      12.4        72       134        60
OIR    2025250     91400   18.1400 -111.4300      12.4        72       133        60
OIR    2025250     91400   18.1400 -111.4400      12.3        72       132        60
OIR    2025250     91400   18.1400 -111.4500      12.3        72       131        60
OIR    2025250     91400   18.1400 -111.4600      12.2        72       131        60
OIR    2025250     91400   18.1400 -111.4700      12.1        72       130        60
OIR    2025250     91400   18.1400 -111.4800      12.0        72       128        60
OIR    2025250     91400   18.1400 -111.4900      11.8        72       125        60
OIR    2025250     91400   18.1400 -111.5000      11.7        72       123        60
OIR    2025250     91400   18.1400 -111.5100      11.7        72       126        60
OIR    2025250     91400   18.1400 -111.5200      11.6        72       128        60
OIR    2025250     91400   18.1400 -111.5300      11.5        72       125        60
OIR    2025250     91400   18.1400 -111.5400      11.3        71       122        60
OIR    2025250     91400   18.1400 -111.5500      11.1        70       121        60
OIR    2025250     91400   18.1400 -111.5600      11.0        70       120        60
OIR    2025250     91400   18.1400 -111.5700      10.9        69       117        60
OIR    2025250     91400   18.1400 -111.5800      10.8        68       116        60
OIR    2025250     91400   18.1400 -111.5900      10.8        68       114        60
OIR    2025250     91400   18.1400 -111.6000      10.6        68       111        60
OIR    2025250     91400   18.1400 -111.6100      10.4        68       109        60
OIR    2025250     91400   18.1400 -111.6200      10.1        69       107        60
OIR    2025250     91400   18.1400 -111.6300       9.9        69       105        60
OIR    2025250     91400   18.1400 -111.6400       9.6        70       104        60
OIR    2025250     91400   18.1400 -111.6500       9.2        70       104        60
OIR    2025250     91400   18.1400 -111.6600       8.9        70       104        60
OIR    2025250     91400   18.1400 -111.6700       8.8        70       104        60
OIR    2025250     91400   18.1400 -111.6800       8.7        70       103        60
OIR    2025250     91400   18.1400 -111.6900       8.5        70       104        60
OIR    2025250     91400   18.1400 -111.7000       8.0        70       104        60
OIR    2025250     91400   18.1400 -111.7100       7.4        70       104        60
OIR    2025250     91400   18.1400 -111.7200       7.0        71       105        60
OIR    2025250     91400   18.1400 -111.7300       6.8        72       107        60
OIR    2025250     91400   18.1400 -111.7400       6.5        73       110        60
OIR    2025250     91400   18.1400 -111.7500       6.4        73       113        60
OIR    2025250     91400   18.1400 -111.7600       6.3        73       116        60
OIR    2025250     91400   18.1400 -111.7700       6.3        73       121        60
OIR    2025250     91400   18.1400 -111.7800       6.4        73       125        60
OIR    2025250     91400   18.1400 -111.7900       6.5        71       128        60
OIR    2025250     91400   18.1400 -111.8000       6.8        65       131        60
OIR    2025250     91400   18.1400 -111.8100       7.3        62       131        60
OIR    2025250     91400   18.1400 -111.8200       7.2        60       131        60
OIR    2025250     91400   18.1400 -111.8300       7.3        59       134        60
OIR    2025250     91400   18.1400 -111.8400       8.4        57       140        60
OIR    2025250     91400   18.1400 -111.9800       8.4        66       140        60
OIR    2025250     91400   18.1400 -111.9900       8.8        75       137        60
OIR    2025250     91400   18.1400 -112.0000       9.3        81       136        60
OIR    2025250     91400   18.1400 -112.0100       9.6        83       135        60
OIR    2025250     91400   18.1400 -112.0200       9.7        84       134        60
OIR    2025250     91400   18.1400 -112.0300       9.7        84       132        60
OIR    2025250     91400   18.1400 -112.0400       9.8        84       130        60
OIR    2025250     91400   18.1400 -112.0500       9.9        85       131        60
OIR    2025250     91400   18.1400 -112.0600      10.0        85       131        60
OIR    2025250     91400   18.1400 -112.0700      10.1        85       128        60
OIR    2025250     91400   18.1400 -112.0800      10.1        85       125        60
OIR    2025250     91400   18.1400 -112.0900      10.1        85       122        60
OIR    2025250     91400   18.1400 -112.1000      10.2        85       117        60
OIR    2025250     91400   18.1400 -112.1100      10.2        85       116        60
OIR    2025250     91400   18.1400 -112.1200      10.2        85       115        60
OIR    2025250     91400   18.1400 -112.1300      10.4        86       114        60
OIR    2025250     91400   18.1400 -112.1400      10.5        87       116        60
OIR    2025250     91400   18.1400 -112.1500      10.8        88       120        60
OIR    2025250     91400   18.1400 -112.1600      11.2        88       123        60
OIR    2025250     91400   18.1400 -112.1700      11.5        88       126        60
OIR    2025250     91400   18.1400 -112.1800      11.7        88       128        60
OIR    2025250     91400   18.1400 -112.1900      11.9        88       129        60
OIR    2025250     91400   18.1400 -112.2000      12.1        88       129        60
OIR    2025250     91400   18.1400 -112.2100      12.3        88       129        60
OIR    2025250     91400   18.1400 -112.2200      12.3        88       129        60
OIR    2025250     91400   18.1400 -112.2300      12.4        88       125        60
OIR    2025250     91400   18.1400 -112.2400      12.4        88       119        60
OIR    2025250     91400   18.1400 -112.2500      12.4        88       115        60
OIR    2025250     91400   18.1400 -112.2600      12.4        88       112        60
OIR    2025250     91400   18.1400 -112.2700      12.3        89       110        60
OIR    2025250     91400   18.1400 -112.2800      12.3        89       113        60
OIR    2025250     91400   18.1400 -112.2900      12.3        89       115        60
OIR    2025250     91400   18.1400 -112.3000      12.2        89       116        60
OIR    2025250     91400   18.1400 -112.3100      12.2        90       119        60
OIR    2025250     91400   18.1400 -112.3200      12.2        93       121        60
OIR    2025250     91400   18.1400 -112.3300      12.1        95       123        60
OIR    2025250     91400   18.1400 -112.3400      11.9        95       125        60
OIR    2025250     91400   18.1400 -112.3500      11.7        97       127        60
OIR    2025250     91400   18.1400 -112.3600      11.4       100       128        60
OIR    2025250     91400   18.1400 -112.3700      11.1       102       131        60
OIR    2025250     91400   18.1400 -112.3800      10.9       103       133        60
OIR    2025250     91400   18.1400 -112.3900      10.8       104       135        60
OIR    2025250     91400   18.1400 -112.4000      10.7       104       135        60
OIR    2025250     91400   18.1400 -112.4100      10.6       104       135        60
OIR    2025250     91400   18.1400 -112.4200      10.5       105       135        60
OIR    2025250     91400   18.1400 -112.4300      10.3       105       135        60
OIR    2025250     91400   18.1400 -112.4400      10.1       106       135        60
OIR    2025250     91400   18.1400 -112.4500      10.0       106       135        60
OIR    2025250     91400   18.1400 -112.4600       9.6       107       135        60
OIR    2025250     91400   18.1400 -112.4700       8.5       109       134        60
OIR    2025250     91400   18.1400 -112.4800       7.9       111       133        60
OIR    2025250     91400   18.1400 -112.4900       7.5       112       133        60
OIR    2025250     91400   18.1400 -112.5000       6.7       114       132        60
OIR    2025250     91400   18.1400 -112.5100       5.9       119       133        60
OIR    2025250     91400   18.1400 -112.5200       5.7       120       133        60
OIR    2025250     91400   18.1400 -112.5300       5.7       120       133        60
OIR    2025250     91400   18.1400 -112.5400       5.6       121       133        60
OIR    2025250     91400   18.1400 -112.5500       5.5       121       132        60
OIR    2025250     91400   18.1400 -112.5600       5.4       122       132        60
OIR    2025250     91400   18.1400 -112.5700       5.3       122       132        60
OIR    2025250     91400   18.1400 -112.5800       5.2       123       132        60
OIR    2025250     91400   18.1400 -112.5900       5.2       123       132        60
OIR    2025250     91400   18.1400 -112.6000       5.0       124       131        60
OIR    2025250     91400   18.1400 -112.6100       5.0       125       130        60
OIR    2025250     91400   18.1400 -112.6200       4.9       127       130        60
OIR    2025250     91400   18.1400 -112.6300       4.8       129       132        60
OIR    2025250     91400   18.1400 -112.6400       4.7       131       132        60
OIR    2025250     91400   18.1400 -112.6500       4.6       133       130        60
OIR    2025250     91400   18.1400 -112.6600       4.5       136       128        60
OIR    2025250     91400   18.1400 -112.6700       4.5       138       128        60
OIR    2025250     91400   18.1400 -112.6800       4.5       140       129        60
OIR    2025250     91400   18.1400 -112.6900       4.5       142       131        60
OIR    2025250     91400   18.1400 -112.7000       4.6       144       133        60
OIR    2025250     91400   18.1400 -112.7100       4.6       145       135        60
OIR    2025250     91400   18.1400 -112.7200       4.7       146       134        60
OIR    2025250     91400   18.1400 -112.7300       4.7       147       134        60
OIR    2025250     91400   18.1400 -112.7400       4.7       147       139        60
OIR    2025250     91400   18.1400 -112.7500       4.7       147       144        60
OIR    2025250     91400   18.1400 -112.8700       4.6       142       142        60
OIR    2025250     91400   18.1400 -112.8800       4.6       139       139        60
OIR    2025250     91400   18.1400 -112.8900       4.6       134       138        60
OIR    2025250     91400   18.1400 -112.9000       4.7       129       137        60
OIR    2025250     91400   18.1400 -112.9100       4.8       128       137        60
OIR    2025250     91400   18.1400 -112.9200       4.9       125       140        60
OIR    2025250     91400   18.1400 -112.9600       5.2       120       143        60
OIR    2025250     91400   18.1400 -112.9700       5.2       119       141        60
OIR    2025250     91400   18.1400 -112.9800       5.1       116       140        60
OIR    2025250     91400   18.1400 -112.9900       5.0       113       138        60
OIR    2025250     91400   18.1400 -113.0000       5.2       104       139        60
OIR    2025250     91400   18.1400 -113.0100       5.6        94       139        60
OIR    2025250     91400   18.1400 -113.0200       5.7        92       141        60
OIR    2025250     91400   18.1400 -113.0300       5.7        88       142        60
OIR    2025250     91400   18.1400 -113.3100       4.4        94       128        60
OIR    2025250     91400   18.1400 -113.3200       4.6        96       128        60
OIR    2025250     91400   18.1400 -113.3300       4.8        98       128        60
OIR    2025250     91400   18.1400 -113.3400       5.0       100       128        60
OIR    2025250     91400   18.1400 -113.3500       5.3       101       129        60
OIR    2025250     91400   18.1400 -113.3600       5.5       102       129        60
OIR    2025250     91400   18.1400 -113.3700       5.8       102       129        60
OIR    2025250     91400   18.1400 -113.3800       6.2       102       129        60
OIR    2025250     91400   18.1400 -113.3900       6.3       102       131        60
OIR    2025250     91400   18.1400 -113.4000       6.4       102       133        60
OIR    2025250     91400   18.1400 -113.4100       6.4       102       139        60
OIR    2025250     91400   18.1400 -114.4100       4.6       293       144        60
OIR    2025250     91400   18.1400 -114.4200       4.6       293       143        60
OIR    2025250     91400   18.1300 -109.1300      10.0        60       141        60
OIR    2025250     91400   18.1300 -109.1400      10.1        61       142        60
OIR    2025250     91400   18.1300 -109.1700      10.2        66       142        60
OIR    2025250     91400   18.1300 -109.1800      10.5        69       141        60
OIR    2025250     91400   18.1300 -109.1900      11.4        70       141        60
OIR    2025250     91400   18.1300 -109.2000      12.4        70       141        60
OIR    2025250     91400   18.1300 -110.3900      15.8        44       142        60
OIR    2025250     91400   18.1300 -110.4000      15.9        45       142        60
OIR    2025250     91400   18.1300 -110.4100      16.0        45       142        60
OIR    2025250     91400   18.1300 -110.4200      16.1        46       143        60
OIR    2025250     91400   18.1300 -110.4700      16.7        47       143        60
OIR    2025250     91400   18.1300 -110.4800      16.8        48       141        60
OIR    2025250     91400   18.1300 -110.4900      16.8        49       141        60
OIR    2025250     91400   18.1300 -110.5000      16.8        49       141        60
OIR    2025250     91400   18.1300 -110.5100      16.7        50       143        60
OIR    2025250     91400   18.1300 -110.5700      16.6        52       142        60
OIR    2025250     91400   18.1300 -110.9300      16.7        57       141        60
OIR    2025250     91400   18.1300 -110.9400      16.8        57       140        60
OIR    2025250     91400   18.1300 -110.9500      16.8        57       141        60
OIR    2025250     91400   18.1300 -110.9600      16.9        57       141        60
OIR    2025250     91400   18.1300 -110.9700      17.0        57       140        60
OIR    2025250     91400   18.1300 -110.9800      17.0        57       139        60
OIR    2025250     91400   18.1300 -110.9900      17.0        57       140        60
OIR    2025250     91400   18.1300 -111.0000      17.1        57       141        60
OIR    2025250     91400   18.1300 -111.0100      17.1        57       142        60
OIR    2025250     91400   18.1300 -111.0200      17.1        57       143        60
OIR    2025250     91400   18.1300 -111.0300      17.1        57       144        60
OIR    2025250     91400   18.1300 -111.0600      17.1        57       142        60
OIR    2025250     91400   18.1300 -111.0700      17.1        57       140        60
OIR    2025250     91400   18.1300 -111.0800      17.1        57       139        60
OIR    2025250     91400   18.1300 -111.0900      17.1        57       139        60
OIR    2025250     91400   18.1300 -111.1000      17.1        57       140        60
OIR    2025250     91400   18.1300 -111.1100      17.1        58       141        60
OIR    2025250     91400   18.1300 -111.1200      16.9        58       142        60
OIR    2025250     91400   18.1300 -111.3400      14.3        62       143        60
OIR    2025250     91400   18.1300 -111.3500      14.3        62       140        60
OIR    2025250     91400   18.1300 -111.3600      14.2        63       137        60
OIR    2025250     91400   18.1300 -111.3700      13.9        64       138        60
OIR    2025250     91400   18.1300 -111.3800      13.7        65       140        60
OIR    2025250     91400   18.1300 -111.3900      13.5        66       139        60
OIR    2025250     91400   18.1300 -111.4000      13.2        68       138        60
OIR    2025250     91400   18.1300 -111.4100      12.8        69       137        60
OIR    2025250     91400   18.1300 -111.4200      12.6        71       137        60
OIR    2025250     91400   18.1300 -111.4300      12.4        71       137        60
OIR    2025250     91400   18.1300 -111.4400      12.4        71       135        60
OIR    2025250     91400   18.1300 -111.4500      12.3        71       132        60
OIR    2025250     91400   18.1300 -111.4600      12.2        71       132        60
OIR    2025250     91400   18.1300 -111.4700      12.1        71       132        60
OIR    2025250     91400   18.1300 -111.4800      12.0        71       131        60
OIR    2025250     91400   18.1300 -111.4900      11.9        71       129        60
OIR    2025250     91400   18.1300 -111.5000      11.7        72       127        60
OIR    2025250     91400   18.1300 -111.5100      11.7        72       128        60
OIR    2025250     91400   18.1300 -111.5200      11.6        71       129        60
OIR    2025250     91400   18.1300 -111.5300      11.5        71       128        60
OIR    2025250     91400   18.1300 -111.5400      11.3        70       126        60
OIR    2025250     91400   18.1300 -111.5500      11.1        70       124        60
OIR    2025250     91400   18.1300 -111.5600      11.0        69       121        60
OIR    2025250     91400   18.1300 -111.5700      10.9        69       119        60
OIR    2025250     91400   18.1300 -111.5800      10.9        68       117        60
OIR    2025250     91400   18.1300 -111.5900      10.8        68       116        60
OIR    2025250     91400   18.1300 -111.6000      10.7        68       115        60
OIR    2025250     91400   18.1300 -111.6100      10.6        68       112        60
OIR    2025250     91400   18.1300 -111.6200      10.4        68       109        60
OIR    2025250     91400   18.1300 -111.6300      10.2        69       108        60
OIR    2025250     91400   18.1300 -111.6400      10.0        69       107        60
OIR    2025250     91400   18.1300 -111.6500       9.7        69       105        60
OIR    2025250     91400   18.1300 -111.6600       9.3        70       104        60
OIR    2025250     91400   18.1300 -111.6700       9.0        70       104        60
OIR    2025250     91400   18.1300 -111.6800       8.8        70       104        60
OIR    2025250     91400   18.1300 -111.6900       8.6        70       104        60
OIR    2025250     91400   18.1300 -111.7000       8.2        70       104        60
OIR    2025250     91400   18.1300 -111.7100       7.6        71       105        60
OIR    2025250     91400   18.1300 -111.7200       7.2        71       107        60
OIR    2025250     91400   18.1300 -111.7300       7.0        72       108        60
OIR    2025250     91400   18.1300 -111.7400       6.7        72       110        60
OIR    2025250     91400   18.1300 -111.7500       6.5        72       114        60
OIR    2025250     91400   18.1300 -111.7600       6.4        73       119        60
OIR    2025250     91400   18.1300 -111.7700       6.4        73       124        60
OIR    2025250     91400   18.1300 -111.7800       6.4        71       130        60
OIR    2025250     91400   18.1300 -111.7900       6.7        65       131        60
OIR    2025250     91400   18.1300 -111.8000       7.1        62       132        60
OIR    2025250     91400   18.1300 -111.8100       7.4        61       133        60
OIR    2025250     91400   18.1300 -111.8200       7.4        60       131        60
OIR    2025250     91400   18.1300 -111.8300       7.6        59       131        60
OIR    2025250     91400   18.1300 -111.8400       8.4        58       136        60
OIR    2025250     91400   18.1300 -111.8500       9.0        57       142        60
OIR    2025250     91400   18.1300 -111.9400       8.9        55       139        60
OIR    2025250     91400   18.1300 -111.9500       8.7        58       138        60
OIR    2025250     91400   18.1300 -111.9600       8.6        60       140        60
OIR    2025250     91400   18.1300 -111.9700       8.5        62       141        60
OIR    2025250     91400   18.1300 -111.9800       8.5        68       139        60
OIR    2025250     91400   18.1300 -111.9900       8.9        77       138        60
OIR    2025250     91400   18.1300 -112.0000       9.5        82       136        60
OIR    2025250     91400   18.1300 -112.0100       9.7        84       134        60
OIR    2025250     91400   18.1300 -112.0200       9.8        84       133        60
OIR    2025250     91400   18.1300 -112.0300       9.9        85       133        60
OIR    2025250     91400   18.1300 -112.0400       9.9        85       132        60
OIR    2025250     91400   18.1300 -112.0500      10.0        85       131        60
OIR    2025250     91400   18.1300 -112.0600      10.0        85       131        60
OIR    2025250     91400   18.1300 -112.0700      10.1        85       128        60
OIR    2025250     91400   18.1300 -112.0800      10.1        85       126        60
OIR    2025250     91400   18.1300 -112.0900      10.1        85       122        60
OIR    2025250     91400   18.1300 -112.1000      10.2        85       119        60
OIR    2025250     91400   18.1300 -112.1100      10.2        85       116        60
OIR    2025250     91400   18.1300 -112.1200      10.2        85       116        60
OIR    2025250     91400   18.1300 -112.1300      10.2        85       116        60
OIR    2025250     91400   18.1300 -112.1400      10.3        86       117        60
OIR    2025250     91400   18.1300 -112.1500      10.5        86       122        60
OIR    2025250     91400   18.1300 -112.1600      10.8        87       124        60
OIR    2025250     91400   18.1300 -112.1700      10.9        87       125        60
OIR    2025250     91400   18.1300 -112.1800      10.9        86       126        60
OIR    2025250     91400   18.1300 -112.1900      11.3        87       127        60
OIR    2025250     91400   18.1300 -112.2000      11.7        87       129        60
OIR    2025250     91400   18.1300 -112.2100      12.0        87       129        60
OIR    2025250     91400   18.1300 -112.2200      12.2        87       128        60
OIR    2025250     91400   18.1300 -112.2300      12.3        87       126        60
OIR    2025250     91400   18.1300 -112.2400      12.3        87       120        60
OIR    2025250     91400   18.1300 -112.2500      12.4        87       116        60
OIR    2025250     91400   18.1300 -112.2600      12.3        88       113        60
OIR    2025250     91400   18.1300 -112.2700      12.2        88       111        60
OIR    2025250     91400   18.1300 -112.2800      12.2        89       113        60
OIR    2025250     91400   18.1300 -112.2900      12.3        89       114        60
OIR    2025250     91400   18.1300 -112.3000      12.3        91       116        60
OIR    2025250     91400   18.1300 -112.3100      12.2        93       117        60
OIR    2025250     91400   18.1300 -112.3200      12.2        97       120        60
OIR    2025250     91400   18.1300 -112.3300      12.1        99       122        60
OIR    2025250     91400   18.1300 -112.3400      11.9       100       124        60
OIR    2025250     91400   18.1300 -112.3500      11.7       102       126        60
OIR    2025250     91400   18.1300 -112.3600      11.4       103       128        60
OIR    2025250     91400   18.1300 -112.3700      11.2       104       130        60
OIR    2025250     91400   18.1300 -112.3800      11.0       104       133        60
OIR    2025250     91400   18.1300 -112.3900      10.9       104       135        60
OIR    2025250     91400   18.1300 -112.4000      10.8       104       134        60
OIR    2025250     91400   18.1300 -112.4100      10.7       105       134        60
OIR    2025250     91400   18.1300 -112.4200      10.5       105       133        60
OIR    2025250     91400   18.1300 -112.4300      10.3       106       133        60
OIR    2025250     91400   18.1300 -112.4400      10.2       106       133        60
OIR    2025250     91400   18.1300 -112.4500      10.0       106       133        60
OIR    2025250     91400   18.1300 -112.4600       9.7       106       134        60
OIR    2025250     91400   18.1300 -112.4700       8.7       108       135        60
OIR    2025250     91400   18.1300 -112.4800       8.0       110       136        60
OIR    2025250     91400   18.1300 -112.4900       7.3       111       135        60
OIR    2025250     91400   18.1300 -112.5000       6.6       114       132        60
OIR    2025250     91400   18.1300 -112.5100       6.0       118       131        60
OIR    2025250     91400   18.1300 -112.5200       5.8       120       130        60
OIR    2025250     91400   18.1300 -112.5300       5.7       121       131        60
OIR    2025250     91400   18.1300 -112.5400       5.7       121       133        60
OIR    2025250     91400   18.1300 -112.5500       5.6       122       135        60
OIR    2025250     91400   18.1300 -112.5600       5.5       122       133        60
OIR    2025250     91400   18.1300 -112.5700       5.4       123       131        60
OIR    2025250     91400   18.1300 -112.5800       5.3       123       130        60
OIR    2025250     91400   18.1300 -112.5900       5.1       124       129        60
OIR    2025250     91400   18.1300 -112.6000       5.0       125       128        60
OIR    2025250     91400   18.1300 -112.6100       4.9       127       129        60
OIR    2025250     91400   18.1300 -112.6200       4.8       129       130        60
OIR    2025250     91400   18.1300 -112.6300       4.8       131       130        60
OIR    2025250     91400   18.1300 -112.6400       4.7       134       130        60
OIR    2025250     91400   18.1300 -112.6500       4.6       136       126        60
OIR    2025250     91400   18.1300 -112.6600       4.5       138       123        60
OIR    2025250     91400   18.1300 -112.6700       4.5       140       123        60
OIR    2025250     91400   18.1300 -112.6800       4.5       141       125        60
OIR    2025250     91400   18.1300 -112.6900       4.6       143       127        60
OIR    2025250     91400   18.1300 -112.7000       4.6       144       130        60
OIR    2025250     91400   18.1300 -112.7100       4.6       145       133        60
OIR    2025250     91400   18.1300 -112.7200       4.7       146       133        60
OIR    2025250     91400   18.1300 -112.7300       4.7       147       134        60
OIR    2025250     91400   18.1300 -112.7400       4.7       147       137        60
OIR    2025250     91400   18.1300 -112.7500       4.7       147       139        60
OIR    2025250     91400   18.1300 -112.7600       4.7       148       142        60
OIR    2025250     91400   18.1300 -112.8700       4.5       144       144        60
OIR    2025250     91400   18.1300 -112.8800       4.5       142       141        60
OIR    2025250     91400   18.1300 -112.8900       4.5       138       139        60
OIR    2025250     91400   18.1300 -112.9000       4.6       132       138        60
OIR    2025250     91400   18.1300 -112.9100       4.7       128       138        60
OIR    2025250     91400   18.1300 -112.9200       4.8       127       138        60
OIR    2025250     91400   18.1300 -112.9300       5.0       124       142        60
OIR    2025250     91400   18.1300 -112.9800       5.0       117       142        60
OIR    2025250     91400   18.1300 -112.9900       5.0       113       140        60
OIR    2025250     91400   18.1300 -113.0000       5.2       105       138        60
OIR    2025250     91400   18.1300 -113.0100       5.5        95       136        60
OIR    2025250     91400   18.1300 -113.0200       5.6        93       138        60
OIR    2025250     91400   18.1300 -113.0300       5.7        89       140        60
OIR    2025250     91400   18.1300 -113.3000       4.2        94       128        60
OIR    2025250     91400   18.1300 -113.3100       4.4        96       127        60
OIR    2025250     91400   18.1300 -113.3200       4.5        97       127        60
OIR    2025250     91400   18.1300 -113.3300       4.6        97       127        60
OIR    2025250     91400   18.1300 -113.3400       4.8        98       127        60
OIR    2025250     91400   18.1300 -113.3500       5.0       100       127        60
OIR    2025250     91400   18.1300 -113.3600       5.3       101       128        60
OIR    2025250     91400   18.1300 -113.3700       5.7       102       128        60
OIR    2025250     91400   18.1300 -113.3800       6.1       102       129        60
OIR    2025250     91400   18.1300 -113.3900       6.3       102       130        60
OIR    2025250     91400   18.1300 -113.4000       6.4       102       133        60
OIR    2025250     91400   18.1300 -113.4100       6.4       102       138        60
OIR    2025250     91400   18.1300 -113.4200       6.4       102       143        60
OIR    2025250     91400   18.1300 -114.4000       4.6       294       143        60
OIR    2025250     91400   18.1300 -114.4100       4.6       293       142        60
OIR    2025250     91400   18.1300 -114.4200       4.6       293       141        60
OIR    2025250     91400   18.1300 -114.4300       4.6       292       143        60
OIR    2025250     91400   18.1200 -109.1800       9.2        73       140        60
OIR    2025250     91400   18.1200 -109.1900       9.5        76       139        60
OIR    2025250     91400   18.1200 -109.2000      10.5        75       140        60
OIR    2025250     91400   18.1200 -110.3900      15.6        45       140        60
OIR    2025250     91400   18.1200 -110.4000      15.8        45       141        60
OIR    2025250     91400   18.1200 -110.4100      16.0        46       143        60
OIR    2025250     91400   18.1200 -110.4200      16.0        46       142        60
OIR    2025250     91400   18.1200 -110.4300      16.0        46       142        60
OIR    2025250     91400   18.1200 -110.4400      16.0        47       141        60
OIR    2025250     91400   18.1200 -110.4500      16.2        47       139        60
OIR    2025250     91400   18.1200 -110.4600      16.5        47       138        60
OIR    2025250     91400   18.1200 -110.4700      16.6        47       139        60
OIR    2025250     91400   18.1200 -110.4800      16.7        48       139        60
OIR    2025250     91400   18.1200 -110.4900      16.7        49       139        60
OIR    2025250     91400   18.1200 -110.5000      16.7        49       139        60
OIR    2025250     91400   18.1200 -110.5100      16.7        50       139        60
OIR    2025250     91400   18.1200 -110.5200      16.6        50       142        60
OIR    2025250     91400   18.1200 -110.5400      16.5        52       143        60
OIR    2025250     91400   18.1200 -110.5500      16.5        52       142        60
OIR    2025250     91400   18.1200 -110.5600      16.5        52       142        60
OIR    2025250     91400   18.1200 -110.5700      16.6        53       142        60
OIR    2025250     91400   18.1200 -110.9400      16.8        57       143        60
OIR    2025250     91400   18.1200 -110.9500      16.9        57       142        60
OIR    2025250     91400   18.1200 -110.9600      16.9        57       142        60
OIR    2025250     91400   18.1200 -110.9700      17.0        57       141        60
OIR    2025250     91400   18.1200 -110.9800      17.0        57       139        60
OIR    2025250     91400   18.1200 -110.9900      17.0        57       141        60
OIR    2025250     91400   18.1200 -111.0000      17.1        58       143        60
OIR    2025250     91400   18.1200 -111.0500      17.1        57       143        60
OIR    2025250     91400   18.1200 -111.0600      17.1        57       142        60
OIR    2025250     91400   18.1200 -111.0700      17.1        57       140        60
OIR    2025250     91400   18.1200 -111.0800      17.1        57       138        60
OIR    2025250     91400   18.1200 -111.0900      17.1        57       139        60
OIR    2025250     91400   18.1200 -111.1000      17.1        58       139        60
OIR    2025250     91400   18.1200 -111.1100      17.1        58       141        60
OIR    2025250     91400   18.1200 -111.1200      17.1        58       142        60
OIR    2025250     91400   18.1200 -111.3500      14.4        62       143        60
OIR    2025250     91400   18.1200 -111.3600      14.4        62       140        60
OIR    2025250     91400   18.1200 -111.3700      14.3        62       141        60
OIR    2025250     91400   18.1200 -111.3800      14.3        63       142        60
OIR    2025250     91400   18.1200 -111.3900      14.1        63       142        60
OIR    2025250     91400   18.1200 -111.4000      13.7        65       140        60
OIR    2025250     91400   18.1200 -111.4100      13.3        66       139        60
OIR    2025250     91400   18.1200 -111.4200      12.9        69       139        60
OIR    2025250     91400   18.1200 -111.4300      12.6        70       139        60
OIR    2025250     91400   18.1200 -111.4400      12.5        70       137        60
OIR    2025250     91400   18.1200 -111.4500      12.4        70       134        60
OIR    2025250     91400   18.1200 -111.4600      12.3        70       133        60
OIR    2025250     91400   18.1200 -111.4700      12.2        70       133        60
OIR    2025250     91400   18.1200 -111.4800      12.0        70       133        60
OIR    2025250     91400   18.1200 -111.4900      11.9        70       133        60
OIR    2025250     91400   18.1200 -111.5000      11.7        70       132        60
OIR    2025250     91400   18.1200 -111.5100      11.6        69       132        60
OIR    2025250     91400   18.1200 -111.5200      11.6        69       131        60
OIR    2025250     91400   18.1200 -111.5300      11.4        69       130        60
OIR    2025250     91400   18.1200 -111.5400      11.3        69       129        60
OIR    2025250     91400   18.1200 -111.5500      11.2        69       127        60
OIR    2025250     91400   18.1200 -111.5600      11.1        68       124        60
OIR    2025250     91400   18.1200 -111.5700      11.1        68       120        60
OIR    2025250     91400   18.1200 -111.5800      11.0        68       120        60
OIR    2025250     91400   18.1200 -111.5900      10.9        68       120        60
OIR    2025250     91400   18.1200 -111.6000      10.8        68       119        60
OIR    2025250     91400   18.1200 -111.6100      10.7        68       115        60
OIR    2025250     91400   18.1200 -111.6200      10.7        68       112        60
OIR    2025250     91400   18.1200 -111.6300      10.6        68       110        60
OIR    2025250     91400   18.1200 -111.6400      10.5        68       108        60
OIR    2025250     91400   18.1200 -111.6500      10.3        69       107        60
OIR    2025250     91400   18.1200 -111.6600       9.9        69       105        60
OIR    2025250     91400   18.1200 -111.6700       9.5        69       104        60
OIR    2025250     91400   18.1200 -111.6800       9.2        69       104        60
OIR    2025250     91400   18.1200 -111.6900       8.9        70       104        60
OIR    2025250     91400   18.1200 -111.7000       8.5        70       104        60
OIR    2025250     91400   18.1200 -111.7100       7.8        71       105        60
OIR    2025250     91400   18.1200 -111.7200       7.3        72       107        60
OIR    2025250     91400   18.1200 -111.7300       7.1        72       107        60
OIR    2025250     91400   18.1200 -111.7400       6.9        72       109        60
OIR    2025250     91400   18.1200 -111.7500       6.7        72       112        60
OIR    2025250     91400   18.1200 -111.7600       6.5        71       115        60
OIR    2025250     91400   18.1200 -111.7700       6.6        69       120        60
OIR    2025250     91400   18.1200 -111.7800       6.8        65       124        60
OIR    2025250     91400   18.1200 -111.7900       7.2        63       127        60
OIR    2025250     91400   18.1200 -111.8000       7.5        62       129        60
OIR    2025250     91400   18.1200 -111.8100       7.7        61       130        60
OIR    2025250     91400   18.1200 -111.8200       7.9        60       129        60
OIR    2025250     91400   18.1200 -111.8300       8.0        59       128        60
OIR    2025250     91400   18.1200 -111.8400       8.7        58       134        60
OIR    2025250     91400   18.1200 -111.8500       9.3        57       139        60
OIR    2025250     91400   18.1200 -111.9400       8.9        56       137        60
OIR    2025250     91400   18.1200 -111.9500       8.8        58       136        60
OIR    2025250     91400   18.1200 -111.9600       8.7        60       138        60
OIR    2025250     91400   18.1200 -111.9700       8.6        64       140        60
OIR    2025250     91400   18.1200 -111.9800       8.7        71       139        60
OIR    2025250     91400   18.1200 -111.9900       9.2        79       138        60
OIR    2025250     91400   18.1200 -112.0000       9.6        83       136        60
OIR    2025250     91400   18.1200 -112.0100       9.8        84       134        60
OIR    2025250     91400   18.1200 -112.0200       9.9        85       133        60
OIR    2025250     91400   18.1200 -112.0300       9.9        85       133        60
OIR    2025250     91400   18.1200 -112.0400      10.0        85       133        60
OIR    2025250     91400   18.1200 -112.0500      10.0        85       132        60
OIR    2025250     91400   18.1200 -112.0600      10.1        85       131        60
OIR    2025250     91400   18.1200 -112.0700      10.1        85       129        60
OIR    2025250     91400   18.1200 -112.0800      10.1        85       126        60
OIR    2025250     91400   18.1200 -112.0900      10.1        85       123        60
OIR    2025250     91400   18.1200 -112.1000      10.1        85       119        60
OIR    2025250     91400   18.1200 -112.1100      10.1        85       116        60
OIR    2025250     91400   18.1200 -112.1200      10.1        85       116        60
OIR    2025250     91400   18.1200 -112.1300      10.2        85       117        60
OIR    2025250     91400   18.1200 -112.1400      10.2        85       120        60
OIR    2025250     91400   18.1200 -112.1500      10.2        85       123        60
OIR    2025250     91400   18.1200 -112.1600      10.2        84       126        60
OIR    2025250     91400   18.1200 -112.1700      10.1        84       125        60
OIR    2025250     91400   18.1200 -112.1800      10.2        84       124        60
OIR    2025250     91400   18.1200 -112.1900      10.5        84       126        60
OIR    2025250     91400   18.1200 -112.2000      10.8        85       127        60
OIR    2025250     91400   18.1200 -112.2100      11.3        85       127        60
OIR    2025250     91400   18.1200 -112.2200      11.8        85       127        60
OIR    2025250     91400   18.1200 -112.2300      12.0        85       126        60
OIR    2025250     91400   18.1200 -112.2400      12.1        85       122        60
OIR    2025250     91400   18.1200 -112.2500      12.1        85       119        60
OIR    2025250     91400   18.1200 -112.2600      12.1        86       116        60
OIR    2025250     91400   18.1200 -112.2700      12.1        87       113        60
OIR    2025250     91400   18.1200 -112.2800      12.2        88       113        60
OIR    2025250     91400   18.1200 -112.2900      12.2        90       114        60
OIR    2025250     91400   18.1200 -112.3000      12.3        94       116        60
OIR    2025250     91400   18.1200 -112.3100      12.2        97       119        60
OIR    2025250     91400   18.1200 -112.3200      12.2       101       122        60
OIR    2025250     91400   18.1200 -112.3300      12.1       103       123        60
OIR    2025250     91400   18.1200 -112.3400      11.9       104       125        60
OIR    2025250     91400   18.1200 -112.3500      11.7       105       127        60
OIR    2025250     91400   18.1200 -112.3600      11.5       105       129        60
OIR    2025250     91400   18.1200 -112.3700      11.3       104       131        60
OIR    2025250     91400   18.1200 -112.3800      11.1       104       133        60
OIR    2025250     91400   18.1200 -112.3900      11.0       104       135        60
OIR    2025250     91400   18.1200 -112.4000      10.9       105       135        60
OIR    2025250     91400   18.1200 -112.4100      10.7       105       135        60
OIR    2025250     91400   18.1200 -112.4200      10.6       105       133        60
OIR    2025250     91400   18.1200 -112.4300      10.4       106       130        60
OIR    2025250     91400   18.1200 -112.4400      10.2       106       129        60
OIR    2025250     91400   18.1200 -112.4500      10.0       106       131        60
OIR    2025250     91400   18.1200 -112.4600       9.6       107       133        60
OIR    2025250     91400   18.1200 -112.4700       8.9       108       133        60
OIR    2025250     91400   18.1200 -112.4800       8.1       110       134        60
OIR    2025250     91400   18.1200 -112.4900       7.3       112       132        60
OIR    2025250     91400   18.1200 -112.5000       6.6       116       130        60
OIR    2025250     91400   18.1200 -112.5100       6.1       119       129        60
OIR    2025250     91400   18.1200 -112.5200       5.9       121       128        60
OIR    2025250     91400   18.1200 -112.5300       5.8       122       128        60
OIR    2025250     91400   18.1200 -112.5400       5.7       122       129        60
OIR    2025250     91400   18.1200 -112.5500       5.6       123       131        60
OIR    2025250     91400   18.1200 -112.5600       5.5       123       131        60
OIR    2025250     91400   18.1200 -112.5700       5.4       124       131        60
OIR    2025250     91400   18.1200 -112.5800       5.3       124       130        60
OIR    2025250     91400   18.1200 -112.5900       5.0       125       128        60
OIR    2025250     91400   18.1200 -112.6000       4.9       127       127        60
OIR    2025250     91400   18.1200 -112.6100       4.8       130       128        60
OIR    2025250     91400   18.1200 -112.6200       4.7       132       128        60
OIR    2025250     91400   18.1200 -112.6300       4.7       134       128        60
OIR    2025250     91400   18.1200 -112.6400       4.7       136       128        60
OIR    2025250     91400   18.1200 -112.6500       4.6       138       124        60
OIR    2025250     91400   18.1200 -112.6600       4.6       140       120        60
OIR    2025250     91400   18.1200 -112.6700       4.5       141       119        60
OIR    2025250     91400   18.1200 -112.6800       4.5       143       121        60
OIR    2025250     91400   18.1200 -112.6900       4.6       144       123        60
OIR    2025250     91400   18.1200 -112.7000       4.6       145       126        60
OIR    2025250     91400   18.1200 -112.7100       4.7       146       129        60
OIR    2025250     91400   18.1200 -112.7200       4.7       147       132        60
OIR    2025250     91400   18.1200 -112.7300       4.7       147       133        60
OIR    2025250     91400   18.1200 -112.7400       4.7       147       134        60
OIR    2025250     91400   18.1200 -112.7500       4.7       148       135        60
OIR    2025250     91400   18.1200 -112.7600       4.7       148       137        60
OIR    2025250     91400   18.1200 -112.7700       4.7       148       140        60
OIR    2025250     91400   18.1200 -112.7800       4.7       148       144        60
OIR    2025250     91400   18.1200 -112.8800       4.4       145       143        60
OIR    2025250     91400   18.1200 -112.8900       4.4       143       141        60
OIR    2025250     91400   18.1200 -112.9000       4.5       138       139        60
OIR    2025250     91400   18.1200 -112.9100       4.6       130       139        60
OIR    2025250     91400   18.1200 -112.9200       4.7       128       139        60
OIR    2025250     91400   18.1200 -112.9300       4.8       125       139        60
OIR    2025250     91400   18.1200 -112.9400       4.9       122       138        60
OIR    2025250     91400   18.1200 -112.9500       5.0       121       142        60
OIR    2025250     91400   18.1200 -112.9900       4.9       114       144        60
OIR    2025250     91400   18.1200 -113.0000       5.1       106       142        60
OIR    2025250     91400   18.1200 -113.0100       5.4        98       139        60
OIR    2025250     91400   18.1200 -113.0200       5.6        95       140        60
OIR    2025250     91400   18.1200 -113.0300       5.6        92       143        60
OIR    2025250     91400   18.1200 -113.2900       4.0        93       128        60
OIR    2025250     91400   18.1200 -113.3000       4.3        96       128        60
OIR    2025250     91400   18.1200 -113.3100       4.4        96       128        60
OIR    2025250     91400   18.1200 -113.3200       4.4        96       128        60
OIR    2025250     91400   18.1200 -113.3300       4.5        97       128        60
OIR    2025250     91400   18.1200 -113.3400       4.6        97       128        60
OIR    2025250     91400   18.1200 -113.3500       4.8        98       127        60
OIR    2025250     91400   18.1200 -113.3600       5.1       100       127        60
OIR    2025250     91400   18.1200 -113.3700       5.6       101       128        60
OIR    2025250     91400   18.1200 -113.3800       6.1       101       128        60
OIR    2025250     91400   18.1200 -113.3900       6.3       102       130        60
OIR    2025250     91400   18.1200 -113.4000       6.3       102       132        60
OIR    2025250     91400   18.1200 -113.4100       6.4       102       137        60
OIR    2025250     91400   18.1200 -113.4200       6.4       102       142        60
OIR    2025250     91400   18.1200 -114.4100       4.6       293       144        60
OIR    2025250     91400   18.1100 -109.1800       7.8        79       140        60
OIR    2025250     91400   18.1100 -109.1900       7.9        83       138        60
OIR    2025250     91400   18.1100 -109.2000       8.6        84       140        60
OIR    2025250     91400   18.1100 -110.3800      15.4        45       143        60
OIR    2025250     91400   18.1100 -110.3900      15.5        45       138        60
OIR    2025250     91400   18.1100 -110.4000      15.6        46       141        60
OIR    2025250     91400   18.1100 -110.4100      15.8        46       143        60
OIR    2025250     91400   18.1100 -110.4200      15.9        47       142        60
OIR    2025250     91400   18.1100 -110.4300      15.9        47       140        60
OIR    2025250     91400   18.1100 -110.4400      16.0        47       138        60
OIR    2025250     91400   18.1100 -110.4500      16.2        47       136        60
OIR    2025250     91400   18.1100 -110.4600      16.4        47       133        60
OIR    2025250     91400   18.1100 -110.4700      16.5        48       134        60
OIR    2025250     91400   18.1100 -110.4800      16.6        48       136        60
OIR    2025250     91400   18.1100 -110.4900      16.6        49       137        60
OIR    2025250     91400   18.1100 -110.5000      16.6        50       136        60
OIR    2025250     91400   18.1100 -110.5100      16.6        50       136        60
OIR    2025250     91400   18.1100 -110.5200      16.5        51       138        60
OIR    2025250     91400   18.1100 -110.5300      16.5        51       141        60
OIR    2025250     91400   18.1100 -110.5400      16.5        52       140        60
OIR    2025250     91400   18.1100 -110.5500      16.5        52       139        60
OIR    2025250     91400   18.1100 -110.5600      16.5        52       139        60
OIR    2025250     91400   18.1100 -110.5700      16.6        53       141        60
OIR    2025250     91400   18.1100 -110.5800      16.6        53       143        60
OIR    2025250     91400   18.1100 -110.9600      16.9        57       143        60
OIR    2025250     91400   18.1100 -110.9700      17.0        58       141        60
OIR    2025250     91400   18.1100 -110.9800      17.0        58       140        60
OIR    2025250     91400   18.1100 -110.9900      17.1        58       141        60
OIR    2025250     91400   18.1100 -111.0000      17.1        58       144        60
OIR    2025250     91400   18.1100 -111.0500      17.1        58       143        60
OIR    2025250     91400   18.1100 -111.0600      17.1        58       141        60
OIR    2025250     91400   18.1100 -111.0700      17.1        58       139        60
OIR    2025250     91400   18.1100 -111.0800      17.1        58       137        60
OIR    2025250     91400   18.1100 -111.0900      17.1        58       138        60
OIR    2025250     91400   18.1100 -111.1000      17.1        58       138        60
OIR    2025250     91400   18.1100 -111.1100      17.1        58       140        60
OIR    2025250     91400   18.1100 -111.1200      17.1        58       142        60
OIR    2025250     91400   18.1100 -111.3400      14.4        62       144        60
OIR    2025250     91400   18.1100 -111.3500      14.4        62       144        60
OIR    2025250     91400   18.1100 -111.3600      14.4        62       143        60
OIR    2025250     91400   18.1100 -111.3700      14.4        62       143        60
OIR    2025250     91400   18.1100 -111.3800      14.4        62       143        60
OIR    2025250     91400   18.1100 -111.3900      14.3        62       142        60
OIR    2025250     91400   18.1100 -111.4000      14.2        63       140        60
OIR    2025250     91400   18.1100 -111.4100      13.8        64       138        60
OIR    2025250     91400   18.1100 -111.4200      13.4        66       139        60
OIR    2025250     91400   18.1100 -111.4300      13.0        68       139        60
OIR    2025250     91400   18.1100 -111.4400      12.7        69       137        60
OIR    2025250     91400   18.1100 -111.4500      12.5        69       135        60
OIR    2025250     91400   18.1100 -111.4600      12.4        69       134        60
OIR    2025250     91400   18.1100 -111.4700      12.2        68       134        60
OIR    2025250     91400   18.1100 -111.4800      12.1        68       135        60
OIR    2025250     91400   18.1100 -111.4900      11.9        68       134        60
OIR    2025250     91400   18.1100 -111.5000      11.8        68       132        60
OIR    2025250     91400   18.1100 -111.5100      11.6        68       131        60
OIR    2025250     91400   18.1100 -111.5200      11.5        68       129        60
OIR    2025250     91400   18.1100 -111.5300      11.4        68       128        60
OIR    2025250     91400   18.1100 -111.5400      11.3        68       128        60
OIR    2025250     91400   18.1100 -111.5500      11.3        68       128        60
OIR    2025250     91400   18.1100 -111.5600      11.2        68       124        60
OIR    2025250     91400   18.1100 -111.5700      11.2        68       119        60
OIR    2025250     91400   18.1100 -111.5800      11.1        67       120        60
OIR    2025250     91400   18.1100 -111.5900      11.1        67       121        60
OIR    2025250     91400   18.1100 -111.6000      10.9        68       122        60
OIR    2025250     91400   18.1100 -111.6100      10.8        68       117        60
OIR    2025250     91400   18.1100 -111.6200      10.8        68       114        60
OIR    2025250     91400   18.1100 -111.6300      10.7        68       112        60
OIR    2025250     91400   18.1100 -111.6400      10.7        68       110        60
OIR    2025250     91400   18.1100 -111.6500      10.6        68       108        60
OIR    2025250     91400   18.1100 -111.6600      10.4        68       105        60
OIR    2025250     91400   18.1100 -111.6700      10.1        68       104        60
OIR    2025250     91400   18.1100 -111.6800       9.8        69       104        60
OIR    2025250     91400   18.1100 -111.6900       9.4        69       105        60
OIR    2025250     91400   18.1100 -111.7000       9.0        70       105        60
OIR    2025250     91400   18.1100 -111.7100       8.3        71       105        60
OIR    2025250     91400   18.1100 -111.7200       7.6        72       107        60
OIR    2025250     91400   18.1100 -111.7300       7.3        73       107        60
OIR    2025250     91400   18.1100 -111.7400       7.0        72       108        60
OIR    2025250     91400   18.1100 -111.7500       6.8        72       110        60
OIR    2025250     91400   18.1100 -111.7600       6.7        71       113        60
OIR    2025250     91400   18.1100 -111.7700       6.9        67       116        60
OIR    2025250     91400   18.1100 -111.7800       7.5        63       119        60
OIR    2025250     91400   18.1100 -111.7900       7.9        62       123        60
OIR    2025250     91400   18.1100 -111.8000       8.0        62       126        60
OIR    2025250     91400   18.1100 -111.8100       8.2        62       127        60
OIR    2025250     91400   18.1100 -111.8200       8.3        60       127        60
OIR    2025250     91400   18.1100 -111.8300       8.7        58       128        60
OIR    2025250     91400   18.1100 -111.8400       9.2        57       132        60
OIR    2025250     91400   18.1100 -111.8500       9.6        57       137        60
OIR    2025250     91400   18.1100 -111.8600       9.6        56       142        60
OIR    2025250     91400   18.1100 -111.9400       9.1        56       142        60
OIR    2025250     91400   18.1100 -111.9500       8.9        58       139        60
OIR    2025250     91400   18.1100 -111.9600       8.8        61       139        60
OIR    2025250     91400   18.1100 -111.9700       8.7        65       139        60
OIR    2025250     91400   18.1100 -111.9800       8.9        73       139        60
OIR    2025250     91400   18.1100 -111.9900       9.4        81       138        60
OIR    2025250     91400   18.1100 -112.0000       9.8        84       137        60
OIR    2025250     91400   18.1100 -112.0100       9.9        85       136        60
OIR    2025250     91400   18.1100 -112.0200      10.0        85       134        60
OIR    2025250     91400   18.1100 -112.0300      10.0        85       133        60
OIR    2025250     91400   18.1100 -112.0400      10.0        85       132        60
OIR    2025250     91400   18.1100 -112.0500      10.0        85       132        60
OIR    2025250     91400   18.1100 -112.0600      10.1        85       131        60
OIR    2025250     91400   18.1100 -112.0700      10.1        85       129        60
OIR    2025250     91400   18.1100 -112.0800      10.1        85       125        60
OIR    2025250     91400   18.1100 -112.0900      10.1        85       121        60
OIR    2025250     91400   18.1100 -112.1000      10.1        85       116        60
OIR    2025250     91400   18.1100 -112.1100      10.1        85       114        60
OIR    2025250     91400   18.1100 -112.1200      10.1        85       116        60
OIR    2025250     91400   18.1100 -112.1300      10.1        85       117        60
OIR    2025250     91400   18.1100 -112.1400      10.1        85       120        60
OIR    2025250     91400   18.1100 -112.1500      10.1        84       122        60
OIR    2025250     91400   18.1100 -112.1600      10.1        84       125        60
OIR    2025250     91400   18.1100 -112.1700      10.0        84       124        60
OIR    2025250     91400   18.1100 -112.1800      10.0        84       124        60
OIR    2025250     91400   18.1100 -112.1900      10.1        83       124        60
OIR    2025250     91400   18.1100 -112.2000      10.2        84       124        60
OIR    2025250     91400   18.1100 -112.2100      10.5        83       125        60
OIR    2025250     91400   18.1100 -112.2200      10.9        83       125        60
OIR    2025250     91400   18.1100 -112.2300      11.3        83       124        60
OIR    2025250     91400   18.1100 -112.2400      11.4        83       121        60
OIR    2025250     91400   18.1100 -112.2500      11.4        83       116        60
OIR    2025250     91400   18.1100 -112.2600      11.5        85       115        60
OIR    2025250     91400   18.1100 -112.2700      11.8        86       113        60
OIR    2025250     91400   18.1100 -112.2800      12.0        88       113        60
OIR    2025250     91400   18.1100 -112.2900      12.2        91       113        60
OIR    2025250     91400   18.1100 -112.3000      12.1        96       115        60
OIR    2025250     91400   18.1100 -112.3100      12.2       100       119        60
OIR    2025250     91400   18.1100 -112.3200      12.1       104       122        60
OIR    2025250     91400   18.1100 -112.3300      11.9       105       124        60
OIR    2025250     91400   18.1100 -112.3400      11.8       106       126        60
OIR    2025250     91400   18.1100 -112.3500      11.7       106       128        60
OIR    2025250     91400   18.1100 -112.3600      11.6       105       129        60
OIR    2025250     91400   18.1100 -112.3700      11.4       105       130        60
OIR    2025250     91400   18.1100 -112.3800      11.3       105       133        60
OIR    2025250     91400   18.1100 -112.3900      11.1       105       135        60
OIR    2025250     91400   18.1100 -112.4000      11.0       105       135        60
OIR    2025250     91400   18.1100 -112.4100      10.9       106       135        60
OIR    2025250     91400   18.1100 -112.4200      10.7       106       133        60
OIR    2025250     91400   18.1100 -112.4300      10.4       107       129        60
OIR    2025250     91400   18.1100 -112.4400      10.2       107       126        60
OIR    2025250     91400   18.1100 -112.4500       9.9       108       129        60
OIR    2025250     91400   18.1100 -112.4600       9.6       109       132        60
OIR    2025250     91400   18.1100 -112.4700       9.0       111       132        60
OIR    2025250     91400   18.1100 -112.4800       8.3       113       132        60
OIR    2025250     91400   18.1100 -112.4900       7.5       117       130        60
OIR    2025250     91400   18.1100 -112.5000       6.9       120       128        60
OIR    2025250     91400   18.1100 -112.5100       6.4       121       126        60
OIR    2025250     91400   18.1100 -112.5200       6.1       122       126        60
OIR    2025250     91400   18.1100 -112.5300       5.9       123       126        60
OIR    2025250     91400   18.1100 -112.5400       5.8       123       125        60
OIR    2025250     91400   18.1100 -112.5500       5.7       123       125        60
OIR    2025250     91400   18.1100 -112.5600       5.6       124       127        60
OIR    2025250     91400   18.1100 -112.5700       5.5       124       130        60
OIR    2025250     91400   18.1100 -112.5800       5.3       125       131        60
OIR    2025250     91400   18.1100 -112.5900       5.0       127       130        60
OIR    2025250     91400   18.1100 -112.6000       4.8       129       129        60
OIR    2025250     91400   18.1100 -112.6100       4.7       132       127        60
OIR    2025250     91400   18.1100 -112.6200       4.6       135       125        60
OIR    2025250     91400   18.1100 -112.6300       4.6       136       124        60
OIR    2025250     91400   18.1100 -112.6400       4.6       139       124        60
OIR    2025250     91400   18.1100 -112.6500       4.6       140       123        60
OIR    2025250     91400   18.1100 -112.6600       4.6       142       119        60
OIR    2025250     91400   18.1100 -112.6700       4.6       143       116        60
OIR    2025250     91400   18.1100 -112.6800       4.6       144       116        60
OIR    2025250     91400   18.1100 -112.6900       4.6       145       117        60
OIR    2025250     91400   18.1100 -112.7000       4.6       145       122        60
OIR    2025250     91400   18.1100 -112.7100       4.6       146       126        60
OIR    2025250     91400   18.1100 -112.7200       4.7       147       129        60
OIR    2025250     91400   18.1100 -112.7300       4.7       147       130        60
OIR    2025250     91400   18.1100 -112.7400       4.7       147       131        60
OIR    2025250     91400   18.1100 -112.7500       4.7       148       132        60
OIR    2025250     91400   18.1100 -112.7600       4.7       148       133        60
OIR    2025250     91400   18.1100 -112.7700       4.7       148       136        60
OIR    2025250     91400   18.1100 -112.7800       4.7       148       139        60
OIR    2025250     91400   18.1100 -112.7900       4.7       148       140        60
OIR    2025250     91400   18.1100 -112.8000       4.7       148       141        60
OIR    2025250     91400   18.1100 -112.8100       4.6       148       143        60
OIR    2025250     91400   18.1100 -112.8900       4.4       145       142        60
OIR    2025250     91400   18.1100 -112.9000       4.4       143       140        60
OIR    2025250     91400   18.1100 -112.9100       4.5       136       139        60
OIR    2025250     91400   18.1100 -112.9200       4.6       130       138        60
OIR    2025250     91400   18.1100 -112.9300       4.7       126       138        60
OIR    2025250     91400   18.1100 -112.9400       4.8       124       137        60
OIR    2025250     91400   18.1100 -112.9500       4.8       122       140        60
OIR    2025250     91400   18.1100 -113.0000       5.0       107       145        60
OIR    2025250     91400   18.1100 -113.0100       5.3       100       142        60
OIR    2025250     91400   18.1100 -113.0200       5.4        97       142        60
OIR    2025250     91400   18.1100 -113.2800       4.0        93       129        60
OIR    2025250     91400   18.1100 -113.2900       4.2        95       129        60
OIR    2025250     91400   18.1100 -113.3000       4.3        96       129        60
OIR    2025250     91400   18.1100 -113.3100       4.3        96       129        60
OIR    2025250     91400   18.1100 -113.3200       4.4        96       129        60
OIR    2025250     91400   18.1100 -113.3300       4.5        96       129        60
OIR    2025250     91400   18.1100 -113.3400       4.6        97       129        60
OIR    2025250     91400   18.1100 -113.3500       4.7        97       129        60
OIR    2025250     91400   18.1100 -113.3600       4.9        98       129        60
OIR    2025250     91400   18.1100 -113.3700       5.6       100       129        60
OIR    2025250     91400   18.1100 -113.3800       6.1       101       129        60
OIR    2025250     91400   18.1100 -113.3900       6.3       102       129        60
OIR    2025250     91400   18.1100 -113.4000       6.3       102       130        60
OIR    2025250     91400   18.1100 -113.4100       6.3       102       135        60
OIR    2025250     91400   18.1100 -113.4200       6.3       102       141        60
OIR    2025250     91400   18.1100 -114.4000       4.6       294       144        60
OIR    2025250     91400   18.1100 -114.4100       4.6       293       143        60
OIR    2025250     91400   18.1100 -114.4200       4.6       293       144        60
OIR    2025250     91400   18.1100 -114.4500       4.6       292       144        60
OIR    2025250     91400   18.1000 -109.1800       6.4        90       142        60
OIR    2025250     91400   18.1000 -109.1900       6.7        95       142        60
OIR    2025250     91400   18.1000 -110.3900      15.4        46       140        60
OIR    2025250     91400   18.1000 -110.4000      15.5        46       141        60
OIR    2025250     91400   18.1000 -110.4200      15.8        47       143        60
OIR    2025250     91400   18.1000 -110.4300      15.9        48       140        60
OIR    2025250     91400   18.1000 -110.4400      16.0        48       138        60
OIR    2025250     91400   18.1000 -110.4500      16.1        48       135        60
OIR    2025250     91400   18.1000 -110.4600      16.3        48       132        60
OIR    2025250     91400   18.1000 -110.4700      16.4        48       132        60
OIR    2025250     91400   18.1000 -110.4800      16.4        49       132        60
OIR    2025250     91400   18.1000 -110.4900      16.4        50       133        60
OIR    2025250     91400   18.1000 -110.5000      16.4        51       134        60
OIR    2025250     91400   18.1000 -110.5100      16.4        51       135        60
OIR    2025250     91400   18.1000 -110.5200      16.4        51       135        60
OIR    2025250     91400   18.1000 -110.5300      16.4        52       136        60
OIR    2025250     91400   18.1000 -110.5400      16.4        52       136        60
OIR    2025250     91400   18.1000 -110.5500      16.4        52       137        60
OIR    2025250     91400   18.1000 -110.5600      16.5        53       138        60
OIR    2025250     91400   18.1000 -110.5700      16.5        53       139        60
OIR    2025250     91400   18.1000 -110.5800      16.6        53       141        60
OIR    2025250     91400   18.1000 -110.9700      17.0        58       143        60
OIR    2025250     91400   18.1000 -110.9800      17.0        58       140        60
OIR    2025250     91400   18.1000 -110.9900      17.1        58       140        60
OIR    2025250     91400   18.1000 -111.0000      17.1        58       143        60
OIR    2025250     91400   18.1000 -111.0500      17.1        58       144        60
OIR    2025250     91400   18.1000 -111.0600      17.2        58       141        60
OIR    2025250     91400   18.1000 -111.0700      17.2        58       138        60
OIR    2025250     91400   18.1000 -111.0800      17.1        58       134        60
OIR    2025250     91400   18.1000 -111.0900      17.1        58       134        60
OIR    2025250     91400   18.1000 -111.1000      17.1        58       134        60
OIR    2025250     91400   18.1000 -111.1100      17.1        58       135        60
OIR    2025250     91400   18.1000 -111.1200      17.1        57       138        60
OIR    2025250     91400   18.1000 -111.1300      17.1        57       141        60
OIR    2025250     91400   18.1000 -111.3300      14.4        62       144        60
OIR    2025250     91400   18.1000 -111.3400      14.4        62       144        60
OIR    2025250     91400   18.1000 -111.3500      14.4        62       144        60
OIR    2025250     91400   18.1000 -111.3800      14.4        62       143        60
OIR    2025250     91400   18.1000 -111.3900      14.4        62       142        60
OIR    2025250     91400   18.1000 -111.4000      14.3        62       140        60
OIR    2025250     91400   18.1000 -111.4100      14.2        62       138        60
OIR    2025250     91400   18.1000 -111.4200      14.0        63       138        60
OIR    2025250     91400   18.1000 -111.4300      13.7        63       138        60
OIR    2025250     91400   18.1000 -111.4400      13.3        64       137        60
OIR    2025250     91400   18.1000 -111.4500      12.9        65       136        60
OIR    2025250     91400   18.1000 -111.4600      12.6        66       134        60
OIR    2025250     91400   18.1000 -111.4700      12.3        66       135        60
OIR    2025250     91400   18.1000 -111.4800      12.1        66       136        60
OIR    2025250     91400   18.1000 -111.4900      11.9        67       134        60
OIR    2025250     91400   18.1000 -111.5000      11.8        67       132        60
OIR    2025250     91400   18.1000 -111.5100      11.7        67       130        60
OIR    2025250     91400   18.1000 -111.5200      11.6        67       127        60
OIR    2025250     91400   18.1000 -111.5300      11.5        68       125        60
OIR    2025250     91400   18.1000 -111.5400      11.4        68       126        60
OIR    2025250     91400   18.1000 -111.5500      11.3        68       126        60
OIR    2025250     91400   18.1000 -111.5600      11.2        68       123        60
OIR    2025250     91400   18.1000 -111.5700      11.2        67       117        60
OIR    2025250     91400   18.1000 -111.5800      11.2        67       117        60
OIR    2025250     91400   18.1000 -111.5900      11.1        67       121        60
OIR    2025250     91400   18.1000 -111.6000      11.1        67       123        60
OIR    2025250     91400   18.1000 -111.6100      11.0        67       120        60
OIR    2025250     91400   18.1000 -111.6200      10.8        68       116        60
OIR    2025250     91400   18.1000 -111.6300      10.8        68       113        60
OIR    2025250     91400   18.1000 -111.6400      10.8        68       110        60
OIR    2025250     91400   18.1000 -111.6500      10.7        68       108        60
OIR    2025250     91400   18.1000 -111.6600      10.7        68       107        60
OIR    2025250     91400   18.1000 -111.6700      10.5        68       104        60
OIR    2025250     91400   18.1000 -111.6800      10.4        68       107        60
OIR    2025250     91400   18.1000 -111.6900      10.2        68       108        60
OIR    2025250     91400   18.1000 -111.7000       9.8        69       107        60
OIR    2025250     91400   18.1000 -111.7100       9.3        70       107        60
OIR    2025250     91400   18.1000 -111.7200       8.5        72       105        60
OIR    2025250     91400   18.1000 -111.7300       7.8        72       105        60
OIR    2025250     91400   18.1000 -111.7400       7.4        72       105        60
OIR    2025250     91400   18.1000 -111.7500       7.2        72       109        60
OIR    2025250     91400   18.1000 -111.7600       7.3        69       113        60
OIR    2025250     91400   18.1000 -111.7700       7.7        65       115        60
OIR    2025250     91400   18.1000 -111.7800       8.2        63       116        60
OIR    2025250     91400   18.1000 -111.7900       8.8        62       119        60
OIR    2025250     91400   18.1000 -111.8000       9.2        62       122        60
OIR    2025250     91400   18.1000 -111.8100       9.4        62       124        60
OIR    2025250     91400   18.1000 -111.8200       9.7        61       125        60
OIR    2025250     91400   18.1000 -111.8300       9.7        59       127        60
OIR    2025250     91400   18.1000 -111.8400       9.8        58       131        60
OIR    2025250     91400   18.1000 -111.8500       9.9        57       136        60
OIR    2025250     91400   18.1000 -111.8600       9.9        57       141        60
OIR    2025250     91400   18.1000 -111.9400       9.2        56       144        60
OIR    2025250     91400   18.1000 -111.9500       9.1        58       141        60
OIR    2025250     91400   18.1000 -111.9600       8.9        61       139        60
OIR    2025250     91400   18.1000 -111.9700       8.9        65       138        60
OIR    2025250     91400   18.1000 -111.9800       9.0        72       137        60
OIR    2025250     91400   18.1000 -111.9900       9.7        82       137        60
OIR    2025250     91400   18.1000 -112.0000       9.9        84       137        60
OIR    2025250     91400   18.1000 -112.0100      10.0        85       135        60
OIR    2025250     91400   18.1000 -112.0200      10.0        85       134        60
OIR    2025250     91400   18.1000 -112.0300      10.0        85       132        60
OIR    2025250     91400   18.1000 -112.0400      10.0        85       131        60
OIR    2025250     91400   18.1000 -112.0500      10.1        85       130        60
OIR    2025250     91400   18.1000 -112.0600      10.1        85       130        60
OIR    2025250     91400   18.1000 -112.0700      10.1        85       128        60
OIR    2025250     91400   18.1000 -112.0800      10.1        85       124        60
OIR    2025250     91400   18.1000 -112.0900      10.1        85       119        60
OIR    2025250     91400   18.1000 -112.1000      10.1        85       116        60
OIR    2025250     91400   18.1000 -112.1100      10.1        85       112        60
OIR    2025250     91400   18.1000 -112.1200      10.1        85       114        60
OIR    2025250     91400   18.1000 -112.1300      10.1        85       117        60
OIR    2025250     91400   18.1000 -112.1400      10.0        84       120        60
OIR    2025250     91400   18.1000 -112.1500      10.0        84       122        60
OIR    2025250     91400   18.1000 -112.1600      10.0        84       123        60
OIR    2025250     91400   18.1000 -112.1700      10.0        84       124        60
OIR    2025250     91400   18.1000 -112.1800      10.0        83       124        60
OIR    2025250     91400   18.1000 -112.1900      10.0        83       123        60
OIR    2025250     91400   18.1000 -112.2000      10.0        83       121        60
OIR    2025250     91400   18.1000 -112.2100      10.1        83       121        60
OIR    2025250     91400   18.1000 -112.2200      10.2        83       122        60
OIR    2025250     91400   18.1000 -112.2300      10.4        82       122        60
OIR    2025250     91400   18.1000 -112.2400      10.6        82       117        60
OIR    2025250     91400   18.1000 -112.2500      10.9        83       114        60
OIR    2025250     91400   18.1000 -112.2600      11.2        85       111        60
OIR    2025250     91400   18.1000 -112.2700      11.5        87       111        60
OIR    2025250     91400   18.1000 -112.2800      11.7        89       112        60
OIR    2025250     91400   18.1000 -112.2900      11.9        93       114        60
OIR    2025250     91400   18.1000 -112.3000      11.9        97       116        60
OIR    2025250     91400   18.1000 -112.3100      12.0       101       119        60
OIR    2025250     91400   18.1000 -112.3200      11.9       105       122        60
OIR    2025250     91400   18.1000 -112.3300      11.8       106       124        60
OIR    2025250     91400   18.1000 -112.3400      11.7       106       126        60
OIR    2025250     91400   18.1000 -112.3500      11.7       106       128        60
OIR    2025250     91400   18.1000 -112.3600      11.6       106       128        60
OIR    2025250     91400   18.1000 -112.3700      11.6       106       128        60
OIR    2025250     91400   18.1000 -112.3800      11.5       106       130        60
OIR    2025250     91400   18.1000 -112.3900      11.4       106       131        60
OIR    2025250     91400   18.1000 -112.4000      11.3       106       132        60
OIR    2025250     91400   18.1000 -112.4100      11.1       107       132        60
OIR    2025250     91400   18.1000 -112.4200      10.9       109       131        60
OIR    2025250     91400   18.1000 -112.4300      10.5       110       130        60
OIR    2025250     91400   18.1000 -112.4400      10.2       111       129        60
OIR    2025250     91400   18.1000 -112.4500       9.9       111       129        60
OIR    2025250     91400   18.1000 -112.4600       9.5       112       130        60
OIR    2025250     91400   18.1000 -112.4700       9.2       115       130        60
OIR    2025250     91400   18.1000 -112.4800       8.7       118       131        60
OIR    2025250     91400   18.1000 -112.4900       8.0       122       131        60
OIR    2025250     91400   18.1000 -112.5000       7.4       124       129        60
OIR    2025250     91400   18.1000 -112.5100       6.8       124       128        60
OIR    2025250     91400   18.1000 -112.5200       6.4       124       128        60
OIR    2025250     91400   18.1000 -112.5300       6.1       124       127        60
OIR    2025250     91400   18.1000 -112.5400       5.9       124       127        60
OIR    2025250     91400   18.1000 -112.5500       5.8       124       126        60
OIR    2025250     91400   18.1000 -112.5600       5.6       125       127        60
OIR    2025250     91400   18.1000 -112.5700       5.5       125       129        60
OIR    2025250     91400   18.1000 -112.5800       5.3       127       130        60
OIR    2025250     91400   18.1000 -112.5900       4.9       130       128        60
OIR    2025250     91400   18.1000 -112.6000       4.7       133       126        60
OIR    2025250     91400   18.1000 -112.6100       4.5       136       125        60
OIR    2025250     91400   18.1000 -112.6200       4.5       138       123        60
OIR    2025250     91400   18.1000 -112.6300       4.6       139       122        60
OIR    2025250     91400   18.1000 -112.6400       4.6       141       122        60
OIR    2025250     91400   18.1000 -112.6500       4.5       142       121        60
OIR    2025250     91400   18.1000 -112.6600       4.5       143       117        60
OIR    2025250     91400   18.1000 -112.6700       4.5       144       115        60
OIR    2025250     91400   18.1000 -112.6800       4.6       144       115        60
OIR    2025250     91400   18.1000 -112.6900       4.6       145       115        60
OIR    2025250     91400   18.1000 -112.7000       4.6       145       119        60
OIR    2025250     91400   18.1000 -112.7100       4.6       146       123        60
OIR    2025250     91400   18.1000 -112.7200       4.7       147       127        60
OIR    2025250     91400   18.1000 -112.7300       4.7       147       128        60
OIR    2025250     91400   18.1000 -112.7400       4.7       147       128        60
OIR    2025250     91400   18.1000 -112.7500       4.7       147       129        60
OIR    2025250     91400   18.1000 -112.7600       4.7       148       130        60
OIR    2025250     91400   18.1000 -112.7700       4.7       148       132        60
OIR    2025250     91400   18.1000 -112.7800       4.7       148       134        60
OIR    2025250     91400   18.1000 -112.7900       4.7       148       135        60
OIR    2025250     91400   18.1000 -112.8000       4.6       148       136        60
OIR    2025250     91400   18.1000 -112.8100       4.6       147       137        60
OIR    2025250     91400   18.1000 -112.8200       4.5       147       140        60
OIR    2025250     91400   18.1000 -112.8300       4.4       147       143        60
OIR    2025250     91400   18.1000 -112.8900       4.3       146       144        60
OIR    2025250     91400   18.1000 -112.9000       4.3       144       140        60
OIR    2025250     91400   18.1000 -112.9100       4.4       140       139        60
OIR    2025250     91400   18.1000 -112.9200       4.4       134       137        60
OIR    2025250     91400   18.1000 -112.9300       4.4       129       137        60
OIR    2025250     91400   18.1000 -112.9400       4.5       125       137        60
OIR    2025250     91400   18.1000 -112.9500       4.6       123       138        60
OIR    2025250     91400   18.1000 -112.9600       4.6       121       144        60
OIR    2025250     91400   18.1000 -113.0200       5.2        99       144        60
OIR    2025250     91400   18.1000 -113.2500       4.0        94       134        60
OIR    2025250     91400   18.1000 -113.2600       4.1        95       132        60
OIR    2025250     91400   18.1000 -113.2700       4.2        95       130        60
OIR    2025250     91400   18.1000 -113.2800       4.2        96       130        60
OIR    2025250     91400   18.1000 -113.2900       4.2        96       130        60
OIR    2025250     91400   18.1000 -113.3000       4.3        96       130        60
OIR    2025250     91400   18.1000 -113.3100       4.3        96       130        60
OIR    2025250     91400   18.1000 -113.3200       4.4        96       130        60
OIR    2025250     91400   18.1000 -113.3300       4.4        96       130        60
OIR    2025250     91400   18.1000 -113.3400       4.5        96       130        60
OIR    2025250     91400   18.1000 -113.3500       4.6        96       130        60
OIR    2025250     91400   18.1000 -113.3600       4.9        97       130        60
OIR    2025250     91400   18.1000 -113.3700       5.6        99       130        60
OIR    2025250     91400   18.1000 -113.3800       6.1       101       130        60
OIR    2025250     91400   18.1000 -113.3900       6.3       102       130        60
OIR    2025250     91400   18.1000 -113.4000       6.3       102       130        60
OIR    2025250     91400   18.1000 -113.4100       6.3       102       134        60
OIR    2025250     91400   18.1000 -113.4200       6.4       101       141        60
OIR    2025250     91400   18.1000 -114.3600       4.6       294       140        60
OIR    2025250     91400   18.1000 -114.3700       4.6       294       143        60
OIR    2025250     91400   18.1000 -114.4000       4.6       294       141        60
OIR    2025250     91400   18.1000 -114.4100       4.6       293       140        60
OIR    2025250     91400   18.1000 -114.4200       4.6       293       140        60
OIR    2025250     91400   18.1000 -114.4300       4.6       293       140        60
OIR    2025250     91400   18.1000 -114.4400       4.6       292       142        60
OIR    2025250     91400   18.1000 -114.4500       4.6       292       144        60
OIR    2025250     91400   18.0900 -110.3900      15.2        46       141        60
OIR    2025250     91400   18.0900 -110.4000      15.4        47       141        60
OIR    2025250     91400   18.0900 -110.4300      15.7        48       141        60
OIR    2025250     91400   18.0900 -110.4400      15.9        48       138        60
OIR    2025250     91400   18.0900 -110.4500      16.0        48       135        60
OIR    2025250     91400   18.0900 -110.4600      16.1        49       132        60
OIR    2025250     91400   18.0900 -110.4700      16.3        49       130        60
OIR    2025250     91400   18.0900 -110.4800      16.3        50       129        60
OIR    2025250     91400   18.0900 -110.4900      16.3        51       129        60
OIR    2025250     91400   18.0900 -110.5000      16.3        51       131        60
OIR    2025250     91400   18.0900 -110.5100      16.3        52       133        60
OIR    2025250     91400   18.0900 -110.5200      16.4        52       133        60
OIR    2025250     91400   18.0900 -110.5300      16.4        52       131        60
OIR    2025250     91400   18.0900 -110.5400      16.4        52       131        60
OIR    2025250     91400   18.0900 -110.5500      16.4        52       135        60
OIR    2025250     91400   18.0900 -110.5600      16.5        53       137        60
OIR    2025250     91400   18.0900 -110.5700      16.5        53       138        60
OIR    2025250     91400   18.0900 -110.5800      16.5        53       138        60
OIR    2025250     91400   18.0900 -110.5900      16.6        53       140        60
OIR    2025250     91400   18.0900 -110.9800      17.0        58       142        60
OIR    2025250     91400   18.0900 -110.9900      17.1        58       141        60
OIR    2025250     91400   18.0900 -111.0000      17.1        58       143        60
OIR    2025250     91400   18.0900 -111.0500      17.2        58       144        60
OIR    2025250     91400   18.0900 -111.0600      17.2        58       142        60
OIR    2025250     91400   18.0900 -111.0700      17.2        58       137        60
OIR    2025250     91400   18.0900 -111.0800      17.2        58       131        60
OIR    2025250     91400   18.0900 -111.0900      17.1        58       131        60
OIR    2025250     91400   18.0900 -111.1000      17.1        58       130        60
OIR    2025250     91400   18.0900 -111.1100      17.1        58       131        60
OIR    2025250     91400   18.0900 -111.1200      17.1        57       135        60
OIR    2025250     91400   18.0900 -111.1300      17.1        57       138        60
OIR    2025250     91400   18.0900 -111.1400      17.1        57       142        60
OIR    2025250     91400   18.0900 -111.3800      14.4        62       143        60
OIR    2025250     91400   18.0900 -111.3900      14.4        62       142        60
OIR    2025250     91400   18.0900 -111.4000      14.4        62       142        60
OIR    2025250     91400   18.0900 -111.4100      14.3        62       142        60
OIR    2025250     91400   18.0900 -111.4200      14.1        62       140        60
OIR    2025250     91400   18.0900 -111.4300      13.8        63       138        60
OIR    2025250     91400   18.0900 -111.4400      13.5        63       137        60
OIR    2025250     91400   18.0900 -111.4500      13.1        64       135        60
OIR    2025250     91400   18.0900 -111.4600      12.7        64       134        60
OIR    2025250     91400   18.0900 -111.4700      12.4        65       134        60
OIR    2025250     91400   18.0900 -111.4800      12.1        66       135        60
OIR    2025250     91400   18.0900 -111.4900      11.9        66       134        60
OIR    2025250     91400   18.0900 -111.5000      11.8        67       131        60
OIR    2025250     91400   18.0900 -111.5100      11.7        67       129        60
OIR    2025250     91400   18.0900 -111.5200      11.6        67       126        60
OIR    2025250     91400   18.0900 -111.5300      11.5        67       123        60
OIR    2025250     91400   18.0900 -111.5400      11.4        67       123        60
OIR    2025250     91400   18.0900 -111.5500      11.3        67       123        60
OIR    2025250     91400   18.0900 -111.5600      11.2        67       122        60
OIR    2025250     91400   18.0900 -111.5700      11.2        67       119        60
OIR    2025250     91400   18.0900 -111.5800      11.2        67       116        60
OIR    2025250     91400   18.0900 -111.5900      11.2        67       117        60
OIR    2025250     91400   18.0900 -111.6000      11.1        67       120        60
OIR    2025250     91400   18.0900 -111.6100      11.1        67       119        60
OIR    2025250     91400   18.0900 -111.6200      10.8        68       116        60
OIR    2025250     91400   18.0900 -111.6300      10.8        68       114        60
OIR    2025250     91400   18.0900 -111.6400      10.8        68       112        60
OIR    2025250     91400   18.0900 -111.6500      10.8        68       110        60
OIR    2025250     91400   18.0900 -111.6600      10.7        68       107        60
OIR    2025250     91400   18.0900 -111.6700      10.7        68       104        60
OIR    2025250     91400   18.0900 -111.6800      10.7        68       107        60
OIR    2025250     91400   18.0900 -111.6900      10.6        68       109        60
OIR    2025250     91400   18.0900 -111.7000      10.5        68       109        60
OIR    2025250     91400   18.0900 -111.7100      10.3        68       108        60
OIR    2025250     91400   18.0900 -111.7200       9.9        69       105        60
OIR    2025250     91400   18.0900 -111.7300       9.2        70       105        60
OIR    2025250     91400   18.0900 -111.7400       8.5        71       105        60
OIR    2025250     91400   18.0900 -111.7500       8.1        70       109        60
OIR    2025250     91400   18.0900 -111.7600       8.2        68       112        60
OIR    2025250     91400   18.0900 -111.7700       8.6        65       115        60
OIR    2025250     91400   18.0900 -111.7800       9.0        64       116        60
OIR    2025250     91400   18.0900 -111.7900       9.5        64       116        60
OIR    2025250     91400   18.0900 -111.8000      10.0        63       117        60
OIR    2025250     91400   18.0900 -111.8100      10.3        63       120        60
OIR    2025250     91400   18.0900 -111.8200      10.3        62       123        60
OIR    2025250     91400   18.0900 -111.8300      10.3        60       126        60
OIR    2025250     91400   18.0900 -111.8400      10.3        59       130        60
OIR    2025250     91400   18.0900 -111.8500      10.3        58       134        60
OIR    2025250     91400   18.0900 -111.8600      10.2        57       139        60
OIR    2025250     91400   18.0900 -111.8700       9.8        54       143        60
OIR    2025250     91400   18.0900 -111.9400       9.3        55       143        60
OIR    2025250     91400   18.0900 -111.9500       9.2        57       141        60
OIR    2025250     91400   18.0900 -111.9600       9.1        60       138        60
OIR    2025250     91400   18.0900 -111.9700       9.0        63       135        60
OIR    2025250     91400   18.0900 -111.9800       9.2        72       134        60
OIR    2025250     91400   18.0900 -111.9900       9.9        82       135        60
OIR    2025250     91400   18.0900 -112.0000      10.0        83       134        60
OIR    2025250     91400   18.0900 -112.0100      10.1        84       132        60
OIR    2025250     91400   18.0900 -112.0200      10.1        84       130        60
OIR    2025250     91400   18.0900 -112.0300      10.1        85       129        60
OIR    2025250     91400   18.0900 -112.0400      10.1        85       127        60
OIR    2025250     91400   18.0900 -112.0500      10.1        85       127        60
OIR    2025250     91400   18.0900 -112.0600      10.1        85       127        60
OIR    2025250     91400   18.0900 -112.0700      10.1        85       126        60
OIR    2025250     91400   18.0900 -112.0800      10.1        85       122        60
OIR    2025250     91400   18.0900 -112.0900      10.1        85       116        60
OIR    2025250     91400   18.0900 -112.1000      10.1        85       114        60
OIR    2025250     91400   18.0900 -112.1100      10.1        85       112        60
OIR    2025250     91400   18.0900 -112.1200      10.1        85       112        60
OIR    2025250     91400   18.0900 -112.1300      10.0        84       115        60
OIR    2025250     91400   18.0900 -112.1400      10.0        84       116        60
OIR    2025250     91400   18.0900 -112.1500      10.0        84       119        60
OIR    2025250     91400   18.0900 -112.1600      10.0        84       121        60
OIR    2025250     91400   18.0900 -112.1700       9.9        84       122        60
OIR    2025250     91400   18.0900 -112.1800      10.0        83       122        60
OIR    2025250     91400   18.0900 -112.1900      10.0        83       121        60
OIR    2025250     91400   18.0900 -112.2000      10.0        83       119        60
OIR    2025250     91400   18.0900 -112.2100      10.0        83       116        60
OIR    2025250     91400   18.0900 -112.2200      10.0        83       116        60
OIR    2025250     91400   18.0900 -112.2300      10.0        83       116        60
OIR    2025250     91400   18.0900 -112.2400      10.2        83       114        60
OIR    2025250     91400   18.0900 -112.2500      10.5        84       111        60
OIR    2025250     91400   18.0900 -112.2600      10.9        87       109        60
OIR    2025250     91400   18.0900 -112.2700      11.2        91       109        60
OIR    2025250     91400   18.0900 -112.2800      11.3        95       109        60
OIR    2025250     91400   18.0900 -112.2900      11.5        98       112        60
OIR    2025250     91400   18.0900 -112.3000      11.7       101       114        60
OIR    2025250     91400   18.0900 -112.3100      11.8       103       116        60
OIR    2025250     91400   18.0900 -112.3200      11.7       105       119        60
OIR    2025250     91400   18.0900 -112.3300      11.7       106       122        60
OIR    2025250     91400   18.0900 -112.3400      11.7       106       124        60
OIR    2025250     91400   18.0900 -112.3500      11.7       106       127        60
OIR    2025250     91400   18.0900 -112.3600      11.7       106       127        60
OIR    2025250     91400   18.0900 -112.3700      11.6       106       127        60
OIR    2025250     91400   18.0900 -112.3800      11.6       106       128        60
OIR    2025250     91400   18.0900 -112.3900      11.6       107       128        60
OIR    2025250     91400   18.0900 -112.4000      11.6       108       129        60
OIR    2025250     91400   18.0900 -112.4100      11.5       110       129        60
OIR    2025250     91400   18.0900 -112.4200      11.3       113       129        60
OIR    2025250     91400   18.0900 -112.4300      10.8       116       130        60
OIR    2025250     91400   18.0900 -112.4400      10.2       117       131        60
OIR    2025250     91400   18.0900 -112.4500      10.0       119       130        60
OIR    2025250     91400   18.0900 -112.4600       9.8       122       129        60
OIR    2025250     91400   18.0900 -112.4700       9.8       126       129        60
OIR    2025250     91400   18.0900 -112.4800       9.9       129       130        60
OIR    2025250     91400   18.0900 -112.4900       9.5       130       131        60
OIR    2025250     91400   18.0900 -112.5000       8.5       130       131        60
OIR    2025250     91400   18.0900 -112.5100       7.5       129       131        60
OIR    2025250     91400   18.0900 -112.5200       6.8       127       130        60
OIR    2025250     91400   18.0900 -112.5300       6.4       126       130        60
OIR    2025250     91400   18.0900 -112.5400       6.2       125       129        60
OIR    2025250     91400   18.0900 -112.5500       5.9       125       129        60
OIR    2025250     91400   18.0900 -112.5600       5.7       126       128        60
OIR    2025250     91400   18.0900 -112.5700       5.5       126       128        60
OIR    2025250     91400   18.0900 -112.5800       5.3       127       128        60
OIR    2025250     91400   18.0900 -112.5900       4.8       132       125        60
OIR    2025250     91400   18.0900 -112.6000       4.5       136       121        60
OIR    2025250     91400   18.0900 -112.6100       4.4       138       121        60
OIR    2025250     91400   18.0900 -112.6200       4.4       140       121        60
OIR    2025250     91400   18.0900 -112.6300       4.5       141       121        60
OIR    2025250     91400   18.0900 -112.6400       4.5       142       120        60
OIR    2025250     91400   18.0900 -112.6500       4.5       143       119        60
OIR    2025250     91400   18.0900 -112.6600       4.5       144       116        60
OIR    2025250     91400   18.0900 -112.6700       4.5       144       114        60
OIR    2025250     91400   18.0900 -112.6800       4.6       145       113        60
OIR    2025250     91400   18.0900 -112.6900       4.6       145       113        60
OIR    2025250     91400   18.0900 -112.7000       4.6       146       116        60
OIR    2025250     91400   18.0900 -112.7100       4.6       146       122        60
OIR    2025250     91400   18.0900 -112.7200       4.7       147       126        60
OIR    2025250     91400   18.0900 -112.7300       4.7       147       127        60
OIR    2025250     91400   18.0900 -112.7400       4.7       147       128        60
OIR    2025250     91400   18.0900 -112.7500       4.7       147       129        60
OIR    2025250     91400   18.0900 -112.7600       4.7       147       131        60
OIR    2025250     91400   18.0900 -112.7700       4.7       148       131        60
OIR    2025250     91400   18.0900 -112.7800       4.7       148       132        60
OIR    2025250     91400   18.0900 -112.7900       4.6       148       133        60
OIR    2025250     91400   18.0900 -112.8000       4.6       148       134        60
OIR    2025250     91400   18.0900 -112.8100       4.6       147       135        60
OIR    2025250     91400   18.0900 -112.8200       4.4       147       138        60
OIR    2025250     91400   18.0900 -112.8300       4.3       147       141        60
OIR    2025250     91400   18.0900 -112.8400       4.3       147       143        60
OIR    2025250     91400   18.0900 -112.8500       4.3       147       144        60
OIR    2025250     91400   18.0900 -112.8600       4.3       147       145        60
OIR    2025250     91400   18.0900 -112.9000       4.3       145       144        60
OIR    2025250     91400   18.0900 -112.9100       4.2       142       142        60
OIR    2025250     91400   18.0900 -112.9200       4.2       138       140        60
OIR    2025250     91400   18.0900 -112.9300       4.2       132       139        60
OIR    2025250     91400   18.0900 -112.9400       4.2       127       139        60
OIR    2025250     91400   18.0900 -112.9500       4.3       124       140        60
OIR    2025250     91400   18.0900 -112.9600       4.2       122       143        60
OIR    2025250     91400   18.0900 -113.2300       4.0        94       137        60
OIR    2025250     91400   18.0900 -113.2400       4.1        95       137        60
OIR    2025250     91400   18.0900 -113.2500       4.2        95       137        60
OIR    2025250     91400   18.0900 -113.2600       4.2        95       135        60
OIR    2025250     91400   18.0900 -113.2700       4.2        96       133        60
OIR    2025250     91400   18.0900 -113.2800       4.2        96       132        60
OIR    2025250     91400   18.0900 -113.2900       4.3        96       132        60
OIR    2025250     91400   18.0900 -113.3000       4.3        96       131        60
OIR    2025250     91400   18.0900 -113.3100       4.3        96       129        60
OIR    2025250     91400   18.0900 -113.3200       4.4        96       130        60
OIR    2025250     91400   18.0900 -113.3300       4.4        96       131        60
OIR    2025250     91400   18.0900 -113.3400       4.5        96       132        60
OIR    2025250     91400   18.0900 -113.3500       4.5        96       132        60
OIR    2025250     91400   18.0900 -113.3600       4.8        96       133        60
OIR    2025250     91400   18.0900 -113.3700       5.6        99       133        60
OIR    2025250     91400   18.0900 -113.3800       6.1       101       132        60
OIR    2025250     91400   18.0900 -113.3900       6.3       101       132        60
OIR    2025250     91400   18.0900 -113.4000       6.3       102       132        60
OIR    2025250     91400   18.0900 -113.4100       6.4       102       134        60
OIR    2025250     91400   18.0900 -113.4200       6.4       102       141        60
OIR    2025250     91400   18.0900 -114.3500       4.6       295       144        60
OIR    2025250     91400   18.0900 -114.3600       4.6       294       138        60
OIR    2025250     91400   18.0900 -114.3700       4.6       294       139        60
OIR    2025250     91400   18.0900 -114.3800       4.6       294       142        60
OIR    2025250     91400   18.0900 -114.3900       4.6       294       141        60
OIR    2025250     91400   18.0900 -114.4000       4.6       294       139        60
OIR    2025250     91400   18.0900 -114.4100       4.6       293       138        60
OIR    2025250     91400   18.0900 -114.4200       4.6       293       138        60
OIR    2025250     91400   18.0900 -114.4300       4.6       293       137        60
OIR    2025250     91400   18.0900 -114.4400       4.6       293       140        60
OIR    2025250     91400   18.0900 -114.4500       4.6       292       142        60
OIR    2025250     91400   18.0800 -110.4000      15.3        47       142        60
OIR    2025250     91400   18.0800 -110.4300      15.6        48       142        60
OIR    2025250     91400   18.0800 -110.4400      15.8        49       139        60
OIR    2025250     91400   18.0800 -110.4500      15.9        49       136        60
OIR    2025250     91400   18.0800 -110.4600      16.0        49       132        60
OIR    2025250     91400   18.0800 -110.4700      16.1        50       129        60
OIR    2025250     91400   18.0800 -110.4800      16.2        50       126        60
OIR    2025250     91400   18.0800 -110.4900      16.2        51       124        60
OIR    2025250     91400   18.0800 -110.5000      16.2        52       125        60
OIR    2025250     91400   18.0800 -110.5100      16.3        52       126        60
OIR    2025250     91400   18.0800 -110.5200      16.3        52       127        60
OIR    2025250     91400   18.0800 -110.5300      16.3        52       127        60
OIR    2025250     91400   18.0800 -110.5400      16.3        52       126        60
OIR    2025250     91400   18.0800 -110.5500      16.4        53       130        60
OIR    2025250     91400   18.0800 -110.5600      16.4        53       133        60
OIR    2025250     91400   18.0800 -110.5700      16.5        53       135        60
OIR    2025250     91400   18.0800 -110.5800      16.5        53       135        60
OIR    2025250     91400   18.0800 -110.5900      16.5        53       136        60
OIR    2025250     91400   18.0800 -110.6000      16.6        53       141        60
OIR    2025250     91400   18.0800 -111.0500      17.2        58       142        60
OIR    2025250     91400   18.0800 -111.0600      17.2        58       139        60
OIR    2025250     91400   18.0800 -111.0700      17.2        58       136        60
OIR    2025250     91400   18.0800 -111.0800      17.2        58       132        60
OIR    2025250     91400   18.0800 -111.0900      17.2        58       130        60
OIR    2025250     91400   18.0800 -111.1000      17.1        58       129        60
OIR    2025250     91400   18.0800 -111.1100      17.1        58       129        60
OIR    2025250     91400   18.0800 -111.1200      17.1        57       134        60
OIR    2025250     91400   18.0800 -111.1300      17.1        57       139        60
OIR    2025250     91400   18.0800 -111.1400      17.1        57       144        60
OIR    2025250     91400   18.0800 -111.3700      14.4        62       144        60
OIR    2025250     91400   18.0800 -111.3800      14.4        62       142        60
OIR    2025250     91400   18.0800 -111.3900      14.4        62       141        60
OIR    2025250     91400   18.0800 -111.4000      14.4        62       142        60
OIR    2025250     91400   18.0800 -111.4100      14.3        62       143        60
OIR    2025250     91400   18.0800 -111.4200      14.2        62       143        60
OIR    2025250     91400   18.0800 -111.4300      14.0        62       139        60
OIR    2025250     91400   18.0800 -111.4400      13.6        63       136        60
OIR    2025250     91400   18.0800 -111.4500      13.3        63       135        60
OIR    2025250     91400   18.0800 -111.4600      12.9        64       134        60
OIR    2025250     91400   18.0800 -111.4700      12.5        64       133        60
OIR    2025250     91400   18.0800 -111.4800      12.2        65       134        60
OIR    2025250     91400   18.0800 -111.4900      12.0        66       133        60
OIR    2025250     91400   18.0800 -111.5000      11.8        66       130        60
OIR    2025250     91400   18.0800 -111.5100      11.7        67       128        60
OIR    2025250     91400   18.0800 -111.5200      11.6        67       125        60
OIR    2025250     91400   18.0800 -111.5300      11.5        67       121        60
OIR    2025250     91400   18.0800 -111.5400      11.4        67       121        60
OIR    2025250     91400   18.0800 -111.5500      11.3        67       120        60
OIR    2025250     91400   18.0800 -111.5600      11.2        67       120        60
OIR    2025250     91400   18.0800 -111.5700      11.2        67       119        60
OIR    2025250     91400   18.0800 -111.5800      11.2        67       116        60
OIR    2025250     91400   18.0800 -111.5900      11.2        67       116        60
OIR    2025250     91400   18.0800 -111.6000      11.1        67       115        60
OIR    2025250     91400   18.0800 -111.6100      11.1        67       115        60
OIR    2025250     91400   18.0800 -111.6200      10.9        68       116        60
OIR    2025250     91400   18.0800 -111.6300      10.8        68       116        60
OIR    2025250     91400   18.0800 -111.6400      10.8        68       114        60
OIR    2025250     91400   18.0800 -111.6500      10.8        68       112        60
OIR    2025250     91400   18.0800 -111.6600      10.8        68       109        60
OIR    2025250     91400   18.0800 -111.6700      10.7        68       105        60
OIR    2025250     91400   18.0800 -111.6800      10.7        68       105        60
OIR    2025250     91400   18.0800 -111.6900      10.7        68       108        60
OIR    2025250     91400   18.0800 -111.7000      10.7        68       109        60
OIR    2025250     91400   18.0800 -111.7100      10.7        68       108        60
OIR    2025250     91400   18.0800 -111.7200      10.6        68       108        60
OIR    2025250     91400   18.0800 -111.7300      10.5        68       108        60
OIR    2025250     91400   18.0800 -111.7400      10.4        68       108        60
OIR    2025250     91400   18.0800 -111.7500      10.3        67       110        60
OIR    2025250     91400   18.0800 -111.7600      10.3        66       112        60
OIR    2025250     91400   18.0800 -111.7700      10.5        65       114        60
OIR    2025250     91400   18.0800 -111.7800      10.6        64       115        60
OIR    2025250     91400   18.0800 -111.7900      10.7        63       115        60
OIR    2025250     91400   18.0800 -111.8000      10.7        63       115        60
OIR    2025250     91400   18.0800 -111.8100      10.8        62       116        60
OIR    2025250     91400   18.0800 -111.8200      10.8        62       117        60
OIR    2025250     91400   18.0800 -111.8300      10.7        61       122        60
OIR    2025250     91400   18.0800 -111.8400      10.7        60       126        60
OIR    2025250     91400   18.0800 -111.8500      10.6        59       131        60
OIR    2025250     91400   18.0800 -111.8600      10.5        58       136        60
OIR    2025250     91400   18.0800 -111.8700      10.0        54       141        60
OIR    2025250     91400   18.0800 -111.9200       9.6        54       143        60
OIR    2025250     91400   18.0800 -111.9300       9.5        54       143        60
OIR    2025250     91400   18.0800 -111.9400       9.4        55       142        60
OIR    2025250     91400   18.0800 -111.9500       9.4        56       140        60
OIR    2025250     91400   18.0800 -111.9600       9.3        58       138        60
OIR    2025250     91400   18.0800 -111.9700       9.2        62       134        60
OIR    2025250     91400   18.0800 -111.9800       9.4        72       132        60
OIR    2025250     91400   18.0800 -111.9900      10.0        80       132        60
OIR    2025250     91400   18.0800 -112.0000      10.1        82       132        60
OIR    2025250     91400   18.0800 -112.0100      10.2        82       130        60
OIR    2025250     91400   18.0800 -112.0200      10.2        83       128        60
OIR    2025250     91400   18.0800 -112.0300      10.2        84       126        60
OIR    2025250     91400   18.0800 -112.0400      10.1        85       124        60
OIR    2025250     91400   18.0800 -112.0500      10.1        85       123        60
OIR    2025250     91400   18.0800 -112.0600      10.1        85       123        60
OIR    2025250     91400   18.0800 -112.0700      10.1        85       124        60
OIR    2025250     91400   18.0800 -112.0800      10.1        85       119        60
OIR    2025250     91400   18.0800 -112.0900      10.1        85       115        60
OIR    2025250     91400   18.0800 -112.1000      10.1        85       111        60
OIR    2025250     91400   18.0800 -112.1100      10.1        85       110        60
OIR    2025250     91400   18.0800 -112.1200      10.0        84       110        60
OIR    2025250     91400   18.0800 -112.1300      10.0        84       112        60
OIR    2025250     91400   18.0800 -112.1400       9.9        84       114        60
OIR    2025250     91400   18.0800 -112.1500       9.9        84       116        60
OIR    2025250     91400   18.0800 -112.1600       9.9        84       120        60
OIR    2025250     91400   18.0800 -112.1700       9.9        84       120        60
OIR    2025250     91400   18.0800 -112.1800       9.9        84       120        60
OIR    2025250     91400   18.0800 -112.1900       9.9        83       119        60
OIR    2025250     91400   18.0800 -112.2000       9.9        83       116        60
OIR    2025250     91400   18.0800 -112.2100       9.9        83       114        60
OIR    2025250     91400   18.0800 -112.2200       9.9        83       112        60
OIR    2025250     91400   18.0800 -112.2300       9.9        83       110        60
OIR    2025250     91400   18.0800 -112.2400      10.0        83       108        60
OIR    2025250     91400   18.0800 -112.2500      10.1        84       107        60
OIR    2025250     91400   18.0800 -112.2600      10.6        88       105        60
OIR    2025250     91400   18.0800 -112.2700      11.0        93       105        60
OIR    2025250     91400   18.0800 -112.2800      11.1        98       105        60
OIR    2025250     91400   18.0800 -112.2900      11.3       101       108        60
OIR    2025250     91400   18.0800 -112.3000      11.5       103       110        60
OIR    2025250     91400   18.0800 -112.3100      11.7       104       112        60
OIR    2025250     91400   18.0800 -112.3200      11.7       106       115        60
OIR    2025250     91400   18.0800 -112.3300      11.7       106       117        60
OIR    2025250     91400   18.0800 -112.3400      11.7       106       120        60
OIR    2025250     91400   18.0800 -112.3500      11.7       106       123        60
OIR    2025250     91400   18.0800 -112.3600      11.7       106       124        60
OIR    2025250     91400   18.0800 -112.3700      11.7       106       125        60
OIR    2025250     91400   18.0800 -112.3800      11.7       106       126        60
OIR    2025250     91400   18.0800 -112.3900      11.8       107       127        60
OIR    2025250     91400   18.0800 -112.4000      11.8       108       128        60
OIR    2025250     91400   18.0800 -112.4100      11.8       110       128        60
OIR    2025250     91400   18.0800 -112.4200      11.6       112       128        60
OIR    2025250     91400   18.0800 -112.4300      10.8       116       128        60
OIR    2025250     91400   18.0800 -112.4400      10.2       120       128        60
OIR    2025250     91400   18.0800 -112.4500      10.0       124       126        60
OIR    2025250     91400   18.0800 -112.4600      10.0       128       124        60
OIR    2025250     91400   18.0800 -112.4700      10.0       129       122        60
OIR    2025250     91400   18.0800 -112.4800      10.0       130       122        60
OIR    2025250     91400   18.0800 -112.4900       9.8       130       122        60
OIR    2025250     91400   18.0800 -112.5000       9.1       130       124        60
OIR    2025250     91400   18.0800 -112.5100       7.9       130       126        60
OIR    2025250     91400   18.0800 -112.5200       7.1       129       127        60
OIR    2025250     91400   18.0800 -112.5300       6.7       127       127        60
OIR    2025250     91400   18.0800 -112.5400       6.4       126       127        60
OIR    2025250     91400   18.0800 -112.5500       6.1       126       126        60
OIR    2025250     91400   18.0800 -112.5600       5.9       126       125        60
OIR    2025250     91400   18.0800 -112.5700       5.6       127       124        60
OIR    2025250     91400   18.0800 -112.5800       5.3       129       124        60
OIR    2025250     91400   18.0800 -112.5900       4.8       135       121        60
OIR    2025250     91400   18.0800 -112.6000       4.5       139       119        60
OIR    2025250     91400   18.0800 -112.6100       4.4       140       117        60
OIR    2025250     91400   18.0800 -112.6200       4.4       141       119        60
OIR    2025250     91400   18.0800 -112.6300       4.4       142       120        60
OIR    2025250     91400   18.0800 -112.6400       4.4       143       119        60
OIR    2025250     91400   18.0800 -112.6500       4.5       144       117        60
OIR    2025250     91400   18.0800 -112.6600       4.5       144       116        60
OIR    2025250     91400   18.0800 -112.6700       4.5       144       114        60
OIR    2025250     91400   18.0800 -112.6800       4.5       145       113        60
OIR    2025250     91400   18.0800 -112.6900       4.6       145       113        60
OIR    2025250     91400   18.0800 -112.7000       4.6       146       115        60
OIR    2025250     91400   18.0800 -112.7100       4.6       146       121        60
OIR    2025250     91400   18.0800 -112.7200       4.7       147       126        60
OIR    2025250     91400   18.0800 -112.7300       4.7       147       128        60
OIR    2025250     91400   18.0800 -112.7400       4.7       147       129        60
OIR    2025250     91400   18.0800 -112.7500       4.7       147       130        60
OIR    2025250     91400   18.0800 -112.7600       4.7       148       131        60
OIR    2025250     91400   18.0800 -112.7700       4.7       148       132        60
OIR    2025250     91400   18.0800 -112.7800       4.6       148       131        60
OIR    2025250     91400   18.0800 -112.7900       4.6       147       130        60
OIR    2025250     91400   18.0800 -112.8000       4.6       147       132        60
OIR    2025250     91400   18.0800 -112.8100       4.5       147       133        60
OIR    2025250     91400   18.0800 -112.8200       4.4       147       135        60
OIR    2025250     91400   18.0800 -112.8300       4.3       148       138        60
OIR    2025250     91400   18.0800 -112.8400       4.2       148       141        60
OIR    2025250     91400   18.0800 -112.8500       4.2       148       140        60
OIR    2025250     91400   18.0800 -112.8600       4.2       148       140        60
OIR    2025250     91400   18.0800 -112.8700       4.2       147       142        60
OIR    2025250     91400   18.0800 -112.8800       4.2       147       143        60
OIR    2025250     91400   18.0800 -112.8900       4.2       147       145        60
OIR    2025250     91400   18.0800 -112.9200       4.0       139       143        60
OIR    2025250     91400   18.0800 -113.2200       4.0        94       137        60
OIR    2025250     91400   18.0800 -113.2300       4.1        95       136        60
OIR    2025250     91400   18.0800 -113.2400       4.1        95       138        60
OIR    2025250     91400   18.0800 -113.2500       4.2        95       139        60
OIR    2025250     91400   18.0800 -113.2600       4.2        95       137        60
OIR    2025250     91400   18.0800 -113.2700       4.2        96       135        60
OIR    2025250     91400   18.0800 -113.2800       4.2        96       134        60
OIR    2025250     91400   18.0800 -113.2900       4.3        96       133        60
OIR    2025250     91400   18.0800 -113.3000       4.3        96       132        60
OIR    2025250     91400   18.0800 -113.3100       4.3        96       131        60
OIR    2025250     91400   18.0800 -113.3200       4.4        95       130        60
OIR    2025250     91400   18.0800 -113.3300       4.4        95       131        60
OIR    2025250     91400   18.0800 -113.3400       4.4        95       132        60
OIR    2025250     91400   18.0800 -113.3500       4.5        95       133        60
OIR    2025250     91400   18.0800 -113.3600       4.8        96       134        60
OIR    2025250     91400   18.0800 -113.3700       5.6        99       134        60
OIR    2025250     91400   18.0800 -113.3800       6.1       101       135        60
OIR    2025250     91400   18.0800 -113.3900       6.3       101       135        60
OIR    2025250     91400   18.0800 -113.4000       6.4       101       136        60
OIR    2025250     91400   18.0800 -113.4100       6.4       101       136        60
OIR    2025250     91400   18.0800 -113.4200       6.6       101       143        60
OIR    2025250     91400   18.0800 -114.3500       4.6       294       144        60
OIR    2025250     91400   18.0800 -114.3600       4.6       294       143        60
OIR    2025250     91400   18.0800 -114.3700       4.6       294       142        60
OIR    2025250     91400   18.0800 -114.3800       4.6       294       141        60
OIR    2025250     91400   18.0800 -114.3900       4.6       294       140        60
OIR    2025250     91400   18.0800 -114.4000       4.6       294       138        60
OIR    2025250     91400   18.0800 -114.4100       4.6       293       137        60
OIR    2025250     91400   18.0800 -114.4200       4.6       293       137        60
OIR    2025250     91400   18.0800 -114.4300       4.6       293       137        60
OIR    2025250     91400   18.0800 -114.4400       4.6       293       138        60
OIR    2025250     91400   18.0800 -114.4500       4.6       293       140        60
OIR    2025250     91400   18.0700 -110.4000      15.2        47       143        60
OIR    2025250     91400   18.0700 -110.4300      15.6        49       142        60
OIR    2025250     91400   18.0700 -110.4400      15.7        49       140        60
OIR    2025250     91400   18.0700 -110.4500      15.8        49       137        60
OIR    2025250     91400   18.0700 -110.4600      15.9        50       133        60
OIR    2025250     91400   18.0700 -110.4700      16.0        50       129        60
OIR    2025250     91400   18.0700 -110.4800      16.1        51       125        60
OIR    2025250     91400   18.0700 -110.4900      16.2        52       120        60
OIR    2025250     91400   18.0700 -110.5000      16.2        52       119        60
OIR    2025250     91400   18.0700 -110.5100      16.2        52       120        60
OIR    2025250     91400   18.0700 -110.5200      16.3        52       121        60
OIR    2025250     91400   18.0700 -110.5300      16.3        52       121        60
OIR    2025250     91400   18.0700 -110.5400      16.3        53       122        60
OIR    2025250     91400   18.0700 -110.5500      16.3        53       125        60
OIR    2025250     91400   18.0700 -110.5600      16.4        53       128        60
OIR    2025250     91400   18.0700 -110.5700      16.4        53       130        60
OIR    2025250     91400   18.0700 -110.5800      16.5        53       131        60
OIR    2025250     91400   18.0700 -110.5900      16.5        53       132        60
OIR    2025250     91400   18.0700 -110.6000      16.5        53       138        60
OIR    2025250     91400   18.0700 -111.0500      17.2        58       141        60
OIR    2025250     91400   18.0700 -111.0600      17.2        58       137        60
OIR    2025250     91400   18.0700 -111.0700      17.2        58       134        60
OIR    2025250     91400   18.0700 -111.0800      17.2        58       132        60
OIR    2025250     91400   18.0700 -111.0900      17.2        58       129        60
OIR    2025250     91400   18.0700 -111.1000      17.1        58       128        60
OIR    2025250     91400   18.0700 -111.1100      17.1        58       127        60
OIR    2025250     91400   18.0700 -111.1200      17.1        58       132        60
OIR    2025250     91400   18.0700 -111.1300      17.1        57       139        60
OIR    2025250     91400   18.0700 -111.3300      14.6        61       144        60
OIR    2025250     91400   18.0700 -111.3400      14.5        62       144        60
OIR    2025250     91400   18.0700 -111.3500      14.5        62       143        60
OIR    2025250     91400   18.0700 -111.3600      14.5        62       142        60
OIR    2025250     91400   18.0700 -111.3700      14.5        62       141        60
OIR    2025250     91400   18.0700 -111.3800      14.4        62       140        60
OIR    2025250     91400   18.0700 -111.3900      14.4        62       138        60
OIR    2025250     91400   18.0700 -111.4000      14.4        62       138        60
OIR    2025250     91400   18.0700 -111.4100      14.4        62       139        60
OIR    2025250     91400   18.0700 -111.4200      14.3        62       139        60
OIR    2025250     91400   18.0700 -111.4300      14.2        62       137        60
OIR    2025250     91400   18.0700 -111.4400      13.8        63       134        60
OIR    2025250     91400   18.0700 -111.4500      13.4        63       133        60
OIR    2025250     91400   18.0700 -111.4600      13.0        63       132        60
OIR    2025250     91400   18.0700 -111.4700      12.7        64       132        60
OIR    2025250     91400   18.0700 -111.4800      12.3        65       131        60
OIR    2025250     91400   18.0700 -111.4900      12.0        66       131        60
OIR    2025250     91400   18.0700 -111.5000      11.9        66       129        60
OIR    2025250     91400   18.0700 -111.5100      11.8        66       126        60
OIR    2025250     91400   18.0700 -111.5200      11.7        67       123        60
OIR    2025250     91400   18.0700 -111.5300      11.6        67       120        60
OIR    2025250     91400   18.0700 -111.5400      11.5        67       119        60
OIR    2025250     91400   18.0700 -111.5500      11.4        67       119        60
OIR    2025250     91400   18.0700 -111.5600      11.3        67       119        60
OIR    2025250     91400   18.0700 -111.5700      11.2        67       117        60
OIR    2025250     91400   18.0700 -111.5800      11.2        67       117        60
OIR    2025250     91400   18.0700 -111.5900      11.2        67       116        60
OIR    2025250     91400   18.0700 -111.6000      11.1        67       113        60
OIR    2025250     91400   18.0700 -111.6100      11.1        67       113        60
OIR    2025250     91400   18.0700 -111.6200      10.9        67       115        60
OIR    2025250     91400   18.0700 -111.6300      10.8        68       116        60
OIR    2025250     91400   18.0700 -111.6400      10.8        68       115        60
OIR    2025250     91400   18.0700 -111.6500      10.8        68       114        60
OIR    2025250     91400   18.0700 -111.6600      10.8        68       111        60
OIR    2025250     91400   18.0700 -111.6700      10.8        68       107        60
OIR    2025250     91400   18.0700 -111.6800      10.7        68       105        60
OIR    2025250     91400   18.0700 -111.6900      10.7        68       107        60
OIR    2025250     91400   18.0700 -111.7000      10.7        68       108        60
OIR    2025250     91400   18.0700 -111.7100      10.7        68       109        60
OIR    2025250     91400   18.0700 -111.7200      10.7        67       109        60
OIR    2025250     91400   18.0700 -111.7300      10.7        67       110        60
OIR    2025250     91400   18.0700 -111.7400      10.7        67       110        60
OIR    2025250     91400   18.0700 -111.7500      10.6        67       111        60
OIR    2025250     91400   18.0700 -111.7600      10.7        66       113        60
OIR    2025250     91400   18.0700 -111.7700      10.7        65       114        60
OIR    2025250     91400   18.0700 -111.7800      10.8        65       113        60
OIR    2025250     91400   18.0700 -111.7900      10.9        64       113        60
OIR    2025250     91400   18.0700 -111.8000      10.9        63       113        60
OIR    2025250     91400   18.0700 -111.8100      11.0        63       113        60
OIR    2025250     91400   18.0700 -111.8200      11.0        62       114        60
OIR    2025250     91400   18.0700 -111.8300      11.0        62       116        60
OIR    2025250     91400   18.0700 -111.8400      11.0        61       121        60
OIR    2025250     91400   18.0700 -111.8500      11.0        60       127        60
OIR    2025250     91400   18.0700 -111.8600      10.7        58       133        60
OIR    2025250     91400   18.0700 -111.8700      10.2        54       138        60
OIR    2025250     91400   18.0700 -111.8800      10.1        53       142        60
OIR    2025250     91400   18.0700 -111.8900      10.0        53       143        60
OIR    2025250     91400   18.0700 -111.9000      10.0        53       141        60
OIR    2025250     91400   18.0700 -111.9100       9.9        53       139        60
OIR    2025250     91400   18.0700 -111.9200       9.9        53       139        60
OIR    2025250     91400   18.0700 -111.9300       9.7        54       139        60
OIR    2025250     91400   18.0700 -111.9400       9.7        54       139        60
OIR    2025250     91400   18.0700 -111.9500       9.6        55       139        60
OIR    2025250     91400   18.0700 -111.9600       9.6        57       138        60
OIR    2025250     91400   18.0700 -111.9700       9.5        60       134        60
OIR    2025250     91400   18.0700 -111.9800       9.5        70       130        60
OIR    2025250     91400   18.0700 -111.9900       9.9        78       129        60
OIR    2025250     91400   18.0700 -112.0000      10.1        81       129        60
OIR    2025250     91400   18.0700 -112.0100      10.2        81       127        60
OIR    2025250     91400   18.0700 -112.0200      10.3        82       126        60
OIR    2025250     91400   18.0700 -112.0300      10.2        83       124        60
OIR    2025250     91400   18.0700 -112.0400      10.2        84       121        60
OIR    2025250     91400   18.0700 -112.0500      10.2        85       117        60
OIR    2025250     91400   18.0700 -112.0600      10.2        85       116        60
OIR    2025250     91400   18.0700 -112.0700      10.1        85       116        60
OIR    2025250     91400   18.0700 -112.0800      10.2        85       115        60
OIR    2025250     91400   18.0700 -112.0900      10.1        85       111        60
OIR    2025250     91400   18.0700 -112.1000      10.1        85       109        60
OIR    2025250     91400   18.0700 -112.1100      10.1        85       108        60
OIR    2025250     91400   18.0700 -112.1200      10.0        84       108        60
OIR    2025250     91400   18.0700 -112.1300      10.0        84       109        60
OIR    2025250     91400   18.0700 -112.1400       9.9        84       111        60
OIR    2025250     91400   18.0700 -112.1500       9.9        84       114        60
OIR    2025250     91400   18.0700 -112.1600       9.9        84       117        60
OIR    2025250     91400   18.0700 -112.1700       9.9        84       119        60
OIR    2025250     91400   18.0700 -112.1800       9.9        84       119        60
OIR    2025250     91400   18.0700 -112.1900       9.9        84       119        60
OIR    2025250     91400   18.0700 -112.2000       9.9        84       116        60
OIR    2025250     91400   18.0700 -112.2100       9.9        83       114        60
OIR    2025250     91400   18.0700 -112.2200       9.9        83       112        60
OIR    2025250     91400   18.0700 -112.2300       9.9        83       108        60
OIR    2025250     91400   18.0700 -112.2400       9.9        84       105        60
OIR    2025250     91400   18.0700 -112.2500       9.9        84       104        60
OIR    2025250     91400   18.0700 -112.2600      10.2        88       104        60
OIR    2025250     91400   18.0700 -112.2700      10.8        93       104        60
OIR    2025250     91400   18.0700 -112.2800      11.1        98       104        60
OIR    2025250     91400   18.0700 -112.2900      11.3       101       105        60
OIR    2025250     91400   18.0700 -112.3000      11.4       103       108        60
OIR    2025250     91400   18.0700 -112.3100      11.5       104       110        60
OIR    2025250     91400   18.0700 -112.3200      11.6       105       112        60
OIR    2025250     91400   18.0700 -112.3300      11.7       106       114        60
OIR    2025250     91400   18.0700 -112.3400      11.7       106       116        60
OIR    2025250     91400   18.0700 -112.3500      11.7       106       119        60
OIR    2025250     91400   18.0700 -112.3600      11.7       106       121        60
OIR    2025250     91400   18.0700 -112.3700      11.7       106       122        60
OIR    2025250     91400   18.0700 -112.3800      11.7       107       123        60
OIR    2025250     91400   18.0700 -112.3900      11.8       108       125        60
OIR    2025250     91400   18.0700 -112.4000      11.9       108       126        60
OIR    2025250     91400   18.0700 -112.4100      11.9       109       126        60
OIR    2025250     91400   18.0700 -112.4200      11.8       111       127        60
OIR    2025250     91400   18.0700 -112.4300      11.0       117       126        60
OIR    2025250     91400   18.0700 -112.4400      10.0       123       125        60
OIR    2025250     91400   18.0700 -112.4500      10.0       127       122        60
OIR    2025250     91400   18.0700 -112.4600      10.0       129       119        60
OIR    2025250     91400   18.0700 -112.4700      10.0       129       116        60
OIR    2025250     91400   18.0700 -112.4800      10.0       130       114        60
OIR    2025250     91400   18.0700 -112.4900      10.0       130       112        60
OIR    2025250     91400   18.0700 -112.5000       9.4       130       115        60
OIR    2025250     91400   18.0700 -112.5100       8.2       129       120        60
OIR    2025250     91400   18.0700 -112.5200       7.3       128       122        60
OIR    2025250     91400   18.0700 -112.5300       6.9       126       124        60
OIR    2025250     91400   18.0700 -112.5400       6.6       126       124        60
OIR    2025250     91400   18.0700 -112.5500       6.4       126       122        60
OIR    2025250     91400   18.0700 -112.5600       6.1       127       119        60
OIR    2025250     91400   18.0700 -112.5700       5.8       128       117        60
OIR    2025250     91400   18.0700 -112.5800       5.5       130       117        60
OIR    2025250     91400   18.0700 -112.5900       4.7       136       116        60
OIR    2025250     91400   18.0700 -112.6000       4.4       140       116        60
OIR    2025250     91400   18.0700 -112.6100       4.4       141       116        60
OIR    2025250     91400   18.0700 -112.6200       4.4       142       117        60
OIR    2025250     91400   18.0700 -112.6300       4.4       143       119        60
OIR    2025250     91400   18.0700 -112.6400       4.4       144       117        60
OIR    2025250     91400   18.0700 -112.6500       4.4       144       117        60
OIR    2025250     91400   18.0700 -112.6600       4.5       145       116        60
OIR    2025250     91400   18.0700 -112.6700       4.5       145       115        60
OIR    2025250     91400   18.0700 -112.6800       4.5       145       114        60
OIR    2025250     91400   18.0700 -112.6900       4.6       146       116        60
OIR    2025250     91400   18.0700 -112.7000       4.6       146       116        60
OIR    2025250     91400   18.0700 -112.7100       4.6       146       122        60
OIR    2025250     91400   18.0700 -112.7200       4.7       147       127        60
OIR    2025250     91400   18.0700 -112.7300       4.7       147       128        60
OIR    2025250     91400   18.0700 -112.7400       4.7       147       130        60
OIR    2025250     91400   18.0700 -112.7500       4.7       148       131        60
OIR    2025250     91400   18.0700 -112.7600       4.7       148       133        60
OIR    2025250     91400   18.0700 -112.7700       4.7       148       134        60
OIR    2025250     91400   18.0700 -112.7800       4.6       148       134        60
OIR    2025250     91400   18.0700 -112.7900       4.6       147       133        60
OIR    2025250     91400   18.0700 -112.8000       4.5       148       133        60
OIR    2025250     91400   18.0700 -112.8100       4.4       148       134        60
OIR    2025250     91400   18.0700 -112.8200       4.3       148       135        60
OIR    2025250     91400   18.0700 -112.8300       4.3       148       136        60
OIR    2025250     91400   18.0700 -112.8400       4.2       148       138        60
OIR    2025250     91400   18.0700 -112.8500       4.2       148       138        60
OIR    2025250     91400   18.0700 -112.8600       4.2       148       139        60
OIR    2025250     91400   18.0700 -112.8700       4.2       148       141        60
OIR    2025250     91400   18.0700 -112.8800       4.2       148       144        60
OIR    2025250     91400   18.0700 -113.2200       4.1        94       136        60
OIR    2025250     91400   18.0700 -113.2300       4.1        95       135        60
OIR    2025250     91400   18.0700 -113.2400       4.2        95       138        60
OIR    2025250     91400   18.0700 -113.2500       4.2        95       141        60
OIR    2025250     91400   18.0700 -113.2600       4.2        96       138        60
OIR    2025250     91400   18.0700 -113.2700       4.2        96       135        60
OIR    2025250     91400   18.0700 -113.2800       4.3        96       134        60
OIR    2025250     91400   18.0700 -113.2900       4.3        96       134        60
OIR    2025250     91400   18.0700 -113.3000       4.3        96       134        60
OIR    2025250     91400   18.0700 -113.3100       4.3        95       132        60
OIR    2025250     91400   18.0700 -113.3200       4.4        95       131        60
OIR    2025250     91400   18.0700 -113.3300       4.4        95       131        60
OIR    2025250     91400   18.0700 -113.3400       4.4        95       131        60
OIR    2025250     91400   18.0700 -113.3500       4.5        95       132        60
OIR    2025250     91400   18.0700 -113.3600       4.9        96       133        60
OIR    2025250     91400   18.0700 -113.3700       5.6        99       134        60
OIR    2025250     91400   18.0700 -113.3800       6.2       101       137        60
OIR    2025250     91400   18.0700 -113.3900       6.4       101       140        60
OIR    2025250     91400   18.0700 -113.4000       6.4       101       142        60
OIR    2025250     91400   18.0700 -113.4100       6.6       101       143        60
OIR    2025250     91400   18.0700 -114.3400       4.6       294       142        60
OIR    2025250     91400   18.0700 -114.3500       4.6       294       142        60
OIR    2025250     91400   18.0700 -114.3600       4.6       294       143        60
OIR    2025250     91400   18.0700 -114.3700       4.6       294       143        60
OIR    2025250     91400   18.0700 -114.3800       4.6       294       141        60
OIR    2025250     91400   18.0700 -114.3900       4.6       294       140        60
OIR    2025250     91400   18.0700 -114.4000       4.6       294       139        60
OIR    2025250     91400   18.0700 -114.4100       4.6       293       139        60
OIR    2025250     91400   18.0700 -114.4200       4.6       293       138        60
OIR    2025250     91400   18.0700 -114.4300       4.6       293       137        60
OIR    2025250     91400   18.0700 -114.4400       4.6       293       137        60
OIR    2025250     91400   18.0700 -114.4500       4.6       293       139        60
OIR    2025250     91400   18.0700 -114.4600       4.5       292       144        60
OIR    2025250     91400   18.0600 -110.4000      15.1        48       143        60
OIR    2025250     91400   18.0600 -110.4100      15.2        49       142        60
OIR    2025250     91400   18.0600 -110.4200      15.4        49       142        60
OIR    2025250     91400   18.0600 -110.4300      15.5        49       140        60
OIR    2025250     91400   18.0600 -110.4400      15.6        49       138        60
OIR    2025250     91400   18.0600 -110.4500      15.7        50       135        60
OIR    2025250     91400   18.0600 -110.4600      15.8        50       132        60
OIR    2025250     91400   18.0600 -110.4700      15.9        51       129        60
OIR    2025250     91400   18.0600 -110.4800      16.0        51       125        60
OIR    2025250     91400   18.0600 -110.4900      16.1        52       121        60
OIR    2025250     91400   18.0600 -110.5000      16.1        52       119        60
OIR    2025250     91400   18.0600 -110.5100      16.2        52       119        60
OIR    2025250     91400   18.0600 -110.5200      16.2        52       120        60
OIR    2025250     91400   18.0600 -110.5300      16.2        53       119        60
OIR    2025250     91400   18.0600 -110.5400      16.3        53       119        60
OIR    2025250     91400   18.0600 -110.5500      16.3        53       120        60
OIR    2025250     91400   18.0600 -110.5600      16.4        53       123        60
OIR    2025250     91400   18.0600 -110.5700      16.4        53       125        60
OIR    2025250     91400   18.0600 -110.5800      16.5        53       128        60
OIR    2025250     91400   18.0600 -110.5900      16.5        53       130        60
OIR    2025250     91400   18.0600 -110.6000      16.5        53       135        60
OIR    2025250     91400   18.0600 -110.6100      16.5        54       140        60
OIR    2025250     91400   18.0600 -110.7600      16.5        55       139        60
OIR    2025250     91400   18.0600 -110.7700      16.5        56       143        60
OIR    2025250     91400   18.0600 -111.0400      17.3        58       143        60
OIR    2025250     91400   18.0600 -111.0500      17.3        58       139        60
OIR    2025250     91400   18.0600 -111.0600      17.3        58       136        60
OIR    2025250     91400   18.0600 -111.0700      17.3        58       133        60
OIR    2025250     91400   18.0600 -111.0800      17.2        58       132        60
OIR    2025250     91400   18.0600 -111.0900      17.2        58       131        60
OIR    2025250     91400   18.0600 -111.1000      17.2        58       129        60
OIR    2025250     91400   18.0600 -111.1100      17.1        58       128        60
OIR    2025250     91400   18.0600 -111.1200      17.1        58       131        60
OIR    2025250     91400   18.0600 -111.1300      17.1        58       137        60
OIR    2025250     91400   18.0600 -111.1400      17.1        57       142        60
OIR    2025250     91400   18.0600 -111.3300      14.9        61       144        60
OIR    2025250     91400   18.0600 -111.3400      14.8        61       142        60
OIR    2025250     91400   18.0600 -111.3500      14.7        62       141        60
OIR    2025250     91400   18.0600 -111.3600      14.5        62       140        60
OIR    2025250     91400   18.0600 -111.3700      14.5        62       139        60
OIR    2025250     91400   18.0600 -111.3800      14.5        62       138        60
OIR    2025250     91400   18.0600 -111.3900      14.5        62       136        60
OIR    2025250     91400   18.0600 -111.4000      14.5        62       135        60
OIR    2025250     91400   18.0600 -111.4100      14.4        62       135        60
OIR    2025250     91400   18.0600 -111.4200      14.4        62       135        60
OIR    2025250     91400   18.0600 -111.4300      14.3        62       134        60
OIR    2025250     91400   18.0600 -111.4400      14.0        63       132        60
OIR    2025250     91400   18.0600 -111.4500      13.6        63       131        60
OIR    2025250     91400   18.0600 -111.4600      13.2        63       131        60
OIR    2025250     91400   18.0600 -111.4700      12.8        64       130        60
OIR    2025250     91400   18.0600 -111.4800      12.5        65       129        60
OIR    2025250     91400   18.0600 -111.4900      12.2        66       128        60
OIR    2025250     91400   18.0600 -111.5000      12.0        66       126        60
OIR    2025250     91400   18.0600 -111.5100      11.8        66       125        60
OIR    2025250     91400   18.0600 -111.5200      11.7        67       122        60
OIR    2025250     91400   18.0600 -111.5300      11.6        67       120        60
OIR    2025250     91400   18.0600 -111.5400      11.5        67       117        60
OIR    2025250     91400   18.0600 -111.5500      11.4        67       117        60
OIR    2025250     91400   18.0600 -111.5600      11.3        67       117        60
OIR    2025250     91400   18.0600 -111.5700      11.2        67       117        60
OIR    2025250     91400   18.0600 -111.5800      11.2        67       117        60
OIR    2025250     91400   18.0600 -111.5900      11.2        67       116        60
OIR    2025250     91400   18.0600 -111.6000      11.2        67       114        60
OIR    2025250     91400   18.0600 -111.6100      11.1        67       113        60
OIR    2025250     91400   18.0600 -111.6200      11.0        67       115        60
OIR    2025250     91400   18.0600 -111.6300      10.9        67       116        60
OIR    2025250     91400   18.0600 -111.6400      10.8        68       115        60
OIR    2025250     91400   18.0600 -111.6500      10.8        68       114        60
OIR    2025250     91400   18.0600 -111.6600      10.8        68       112        60
OIR    2025250     91400   18.0600 -111.6700      10.8        68       109        60
OIR    2025250     91400   18.0600 -111.6800      10.8        68       107        60
OIR    2025250     91400   18.0600 -111.6900      10.8        68       108        60
OIR    2025250     91400   18.0600 -111.7000      10.8        67       109        60
OIR    2025250     91400   18.0600 -111.7100      10.8        67       109        60
OIR    2025250     91400   18.0600 -111.7200      10.8        67       110        60
OIR    2025250     91400   18.0600 -111.7300      10.7        67       111        60
OIR    2025250     91400   18.0600 -111.7400      10.7        67       112        60
OIR    2025250     91400   18.0600 -111.7500      10.7        67       114        60
OIR    2025250     91400   18.0600 -111.7600      10.7        66       114        60
OIR    2025250     91400   18.0600 -111.7700      10.8        66       115        60
OIR    2025250     91400   18.0600 -111.7800      10.9        65       114        60
OIR    2025250     91400   18.0600 -111.7900      11.0        65       113        60
OIR    2025250     91400   18.0600 -111.8000      11.1        64       112        60
OIR    2025250     91400   18.0600 -111.8100      11.2        63       112        60
OIR    2025250     91400   18.0600 -111.8200      11.2        62       112        60
OIR    2025250     91400   18.0600 -111.8300      11.2        62       115        60
OIR    2025250     91400   18.0600 -111.8400      11.2        61       119        60
OIR    2025250     91400   18.0600 -111.8500      11.2        61       125        60
OIR    2025250     91400   18.0600 -111.8600      10.9        58       132        60
OIR    2025250     91400   18.0600 -111.8700      10.5        55       136        60
OIR    2025250     91400   18.0600 -111.8800      10.3        54       138        60
OIR    2025250     91400   18.0600 -111.8900      10.2        53       139        60
OIR    2025250     91400   18.0600 -111.9000      10.3        53       138        60
OIR    2025250     91400   18.0600 -111.9100      10.2        53       136        60
OIR    2025250     91400   18.0600 -111.9200      10.2        53       136        60
OIR    2025250     91400   18.0600 -111.9300      10.1        53       136        60
OIR    2025250     91400   18.0600 -111.9400      10.0        54       136        60
OIR    2025250     91400   18.0600 -111.9500       9.9        55       136        60
OIR    2025250     91400   18.0600 -111.9600       9.9        56       136        60
OIR    2025250     91400   18.0600 -111.9700       9.8        59       133        60
OIR    2025250     91400   18.0600 -111.9800       9.6        66       130        60
OIR    2025250     91400   18.0600 -111.9900       9.8        75       128        60
OIR    2025250     91400   18.0600 -112.0000      10.2        79       126        60
OIR    2025250     91400   18.0600 -112.0100      10.3        80       125        60
OIR    2025250     91400   18.0600 -112.0200      10.3        81       123        60
OIR    2025250     91400   18.0600 -112.0300      10.3        82       121        60
OIR    2025250     91400   18.0600 -112.0400      10.3        84       117        60
OIR    2025250     91400   18.0600 -112.0500      10.2        84       115        60
OIR    2025250     91400   18.0600 -112.0600      10.2        85       113        60
OIR    2025250     91400   18.0600 -112.0700      10.2        85       112        60
OIR    2025250     91400   18.0600 -112.0800      10.2        85       110        60
OIR    2025250     91400   18.0600 -112.0900      10.2        85       108        60
OIR    2025250     91400   18.0600 -112.1000      10.2        85       107        60
OIR    2025250     91400   18.0600 -112.1100      10.2        85       105        60
OIR    2025250     91400   18.0600 -112.1200      10.0        84       105        60
OIR    2025250     91400   18.0600 -112.1300      10.0        84       107        60
OIR    2025250     91400   18.0600 -112.1400       9.9        84       109        60
OIR    2025250     91400   18.0600 -112.1500       9.9        84       112        60
OIR    2025250     91400   18.0600 -112.1600       9.9        84       115        60
OIR    2025250     91400   18.0600 -112.1700       9.9        84       119        60
OIR    2025250     91400   18.0600 -112.1800       9.9        84       119        60
OIR    2025250     91400   18.0600 -112.1900       9.9        84       119        60
OIR    2025250     91400   18.0600 -112.2000       9.9        84       116        60
OIR    2025250     91400   18.0600 -112.2100       9.9        84       115        60
OIR    2025250     91400   18.0600 -112.2200       9.9        83       113        60
OIR    2025250     91400   18.0600 -112.2300       9.9        84       109        60
OIR    2025250     91400   18.0600 -112.2400       9.9        84       104        60
OIR    2025250     91400   18.0600 -112.2500       9.9        84       104        60
OIR    2025250     91400   18.0600 -112.2600      10.1        87       104        60
OIR    2025250     91400   18.0600 -112.2700      10.6        93       104        60
OIR    2025250     91400   18.0600 -112.2800      11.0        97       104        60
OIR    2025250     91400   18.0600 -112.2900      11.1       100       105        60
OIR    2025250     91400   18.0600 -112.3000      11.2       102       107        60
OIR    2025250     91400   18.0600 -112.3100      11.4       104       109        60
OIR    2025250     91400   18.0600 -112.3200      11.5       105       110        60
OIR    2025250     91400   18.0600 -112.3300      11.6       106       112        60
OIR    2025250     91400   18.0600 -112.3400      11.6       106       113        60
OIR    2025250     91400   18.0600 -112.3500      11.7       106       115        60
OIR    2025250     91400   18.0600 -112.3600      11.7       106       116        60
OIR    2025250     91400   18.0600 -112.3700      11.7       106       120        60
OIR    2025250     91400   18.0600 -112.3800      11.8       107       121        60
OIR    2025250     91400   18.0600 -112.3900      11.9       108       122        60
OIR    2025250     91400   18.0600 -112.4000      11.8       108       122        60
OIR    2025250     91400   18.0600 -112.4100      11.9       110       121        60
OIR    2025250     91400   18.0600 -112.4200      11.9       111       119        60
OIR    2025250     91400   18.0600 -112.4300      10.6       117       117        60
OIR    2025250     91400   18.0600 -112.4400       9.9       127       116        60
OIR    2025250     91400   18.0600 -112.4500      10.0       129       116        60
OIR    2025250     91400   18.0600 -112.4600      10.0       129       113        60
OIR    2025250     91400   18.0600 -112.4700      10.0       129       111        60
OIR    2025250     91400   18.0600 -112.4800      10.0       129       110        60
OIR    2025250     91400   18.0600 -112.4900      10.0       129       110        60
OIR    2025250     91400   18.0600 -112.5000       9.8       129       111        60
OIR    2025250     91400   18.0600 -112.5100       8.7       128       114        60
OIR    2025250     91400   18.0600 -112.5200       7.5       125       116        60
OIR    2025250     91400   18.0600 -112.5300       7.1       124       119        60
OIR    2025250     91400   18.0600 -112.5400       6.8       124       121        60
OIR    2025250     91400   18.0600 -112.5500       6.6       125       117        60
OIR    2025250     91400   18.0600 -112.5600       6.2       127       116        60
OIR    2025250     91400   18.0600 -112.5700       5.9       128       115        60
OIR    2025250     91400   18.0600 -112.5800       5.5       131       115        60
OIR    2025250     91400   18.0600 -112.5900       4.7       136       115        60
OIR    2025250     91400   18.0600 -112.6000       4.4       141       116        60
OIR    2025250     91400   18.0600 -112.6100       4.4       142       116        60
OIR    2025250     91400   18.0600 -112.6200       4.4       143       116        60
OIR    2025250     91400   18.0600 -112.6300       4.4       144       117        60
OIR    2025250     91400   18.0600 -112.6400       4.4       144       117        60
OIR    2025250     91400   18.0600 -112.6500       4.4       145       117        60
OIR    2025250     91400   18.0600 -112.6600       4.5       145       117        60
OIR    2025250     91400   18.0600 -112.6700       4.5       145       116        60
OIR    2025250     91400   18.0600 -112.6800       4.5       145       115        60
OIR    2025250     91400   18.0600 -112.6900       4.6       146       116        60
OIR    2025250     91400   18.0600 -112.7000       4.6       146       120        60
OIR    2025250     91400   18.0600 -112.7100       4.6       146       123        60
OIR    2025250     91400   18.0600 -112.7200       4.6       147       126        60
OIR    2025250     91400   18.0600 -112.7300       4.7       147       129        60
OIR    2025250     91400   18.0600 -112.7400       4.7       147       130        60
OIR    2025250     91400   18.0600 -112.7500       4.7       148       132        60
OIR    2025250     91400   18.0600 -112.7600       4.7       148       134        60
OIR    2025250     91400   18.0600 -112.7700       4.6       148       135        60
OIR    2025250     91400   18.0600 -112.7800       4.6       148       135        60
OIR    2025250     91400   18.0600 -112.7900       4.5       148       135        60
OIR    2025250     91400   18.0600 -112.8000       4.5       148       135        60
OIR    2025250     91400   18.0600 -112.8100       4.4       148       135        60
OIR    2025250     91400   18.0600 -112.8200       4.3       148       136        60
OIR    2025250     91400   18.0600 -112.8300       4.2       148       135        60
OIR    2025250     91400   18.0600 -112.8400       4.2       148       134        60
OIR    2025250     91400   18.0600 -112.8500       4.2       148       136        60
OIR    2025250     91400   18.0600 -112.8600       4.2       148       138        60
OIR    2025250     91400   18.0600 -112.8700       4.1       148       141        60
OIR    2025250     91400   18.0600 -113.2100       4.0        93       140        60
OIR    2025250     91400   18.0600 -113.2200       4.1        94       140        60
OIR    2025250     91400   18.0600 -113.2300       4.1        95       139        60
OIR    2025250     91400   18.0600 -113.2400       4.2        95       141        60
OIR    2025250     91400   18.0600 -113.2500       4.2        95       142        60
OIR    2025250     91400   18.0600 -113.2600       4.2        96       140        60
OIR    2025250     91400   18.0600 -113.2700       4.3        96       137        60
OIR    2025250     91400   18.0600 -113.2800       4.3        96       135        60
OIR    2025250     91400   18.0600 -113.2900       4.3        96       134        60
OIR    2025250     91400   18.0600 -113.3000       4.3        96       134        60
OIR    2025250     91400   18.0600 -113.3100       4.3        95       133        60
OIR    2025250     91400   18.0600 -113.3200       4.4        95       132        60
OIR    2025250     91400   18.0600 -113.3300       4.4        95       132        60
OIR    2025250     91400   18.0600 -113.3400       4.5        95       133        60
OIR    2025250     91400   18.0600 -113.3500       4.5        95       133        60
OIR    2025250     91400   18.0600 -113.3600       4.9        96       134        60
OIR    2025250     91400   18.0600 -113.3700       5.8        99       136        60
OIR    2025250     91400   18.0600 -113.3800       6.3       101       140        60
OIR    2025250     91400   18.0600 -114.3300       4.6       294       143        60
OIR    2025250     91400   18.0600 -114.3400       4.6       294       141        60
OIR    2025250     91400   18.0600 -114.3500       4.6       294       140        60
OIR    2025250     91400   18.0600 -114.3600       4.6       294       140        60
OIR    2025250     91400   18.0600 -114.3700       4.6       294       141        60
OIR    2025250     91400   18.0600 -114.3800       4.6       294       141        60
OIR    2025250     91400   18.0600 -114.3900       4.6       294       141        60
OIR    2025250     91400   18.0600 -114.4000       4.6       294       141        60
OIR    2025250     91400   18.0600 -114.4100       4.5       293       142        60
OIR    2025250     91400   18.0600 -114.4200       4.5       293       141        60
OIR    2025250     91400   18.0600 -114.4300       4.5       293       139        60
OIR    2025250     91400   18.0600 -114.4400       4.5       293       139        60
OIR    2025250     91400   18.0600 -114.4500       4.5       293       140        60
OIR    2025250     91400   18.0600 -114.4600       4.5       293       143        60
OIR    2025250     91400   18.0500 -110.3900      14.7        47       143        60
OIR    2025250     91400   18.0500 -110.4000      14.9        48       142        60
OIR    2025250     91400   18.0500 -110.4100      15.1        49       141        60
OIR    2025250     91400   18.0500 -110.4200      15.3        49       140        60
OIR    2025250     91400   18.0500 -110.4300      15.4        50       138        60
OIR    2025250     91400   18.0500 -110.4400      15.5        50       136        60
OIR    2025250     91400   18.0500 -110.4500      15.6        50       133        60
OIR    2025250     91400   18.0500 -110.4600      15.7        51       131        60
OIR    2025250     91400   18.0500 -110.4700      15.8        51       129        60
OIR    2025250     91400   18.0500 -110.4800      15.9        52       126        60
OIR    2025250     91400   18.0500 -110.4900      16.0        52       123        60
OIR    2025250     91400   18.0500 -110.5000      16.1        52       120        60
OIR    2025250     91400   18.0500 -110.5100      16.1        52       119        60
OIR    2025250     91400   18.0500 -110.5200      16.2        53       119        60
OIR    2025250     91400   18.0500 -110.5300      16.2        53       117        60
OIR    2025250     91400   18.0500 -110.5400      16.3        53       117        60
OIR    2025250     91400   18.0500 -110.5500      16.3        53       117        60
OIR    2025250     91400   18.0500 -110.5600      16.3        53       117        60
OIR    2025250     91400   18.0500 -110.5700      16.4        53       119        60
OIR    2025250     91400   18.0500 -110.5800      16.4        53       124        60
OIR    2025250     91400   18.0500 -110.5900      16.4        53       128        60
OIR    2025250     91400   18.0500 -110.6000      16.5        54       132        60
OIR    2025250     91400   18.0500 -110.6100      16.5        54       136        60
OIR    2025250     91400   18.0500 -110.6200      16.5        54       140        60
OIR    2025250     91400   18.0500 -111.0400      17.4        58       143        60
OIR    2025250     91400   18.0500 -111.0500      17.5        58       139        60
OIR    2025250     91400   18.0500 -111.0600      17.6        58       135        60
OIR    2025250     91400   18.0500 -111.0700      17.6        58       131        60
OIR    2025250     91400   18.0500 -111.0800      17.4        58       131        60
OIR    2025250     91400   18.0500 -111.0900      17.3        58       132        60
OIR    2025250     91400   18.0500 -111.1000      17.2        58       130        60
OIR    2025250     91400   18.0500 -111.1100      17.2        58       128        60
OIR    2025250     91400   18.0500 -111.1200      17.1        58       130        60
OIR    2025250     91400   18.0500 -111.1300      17.1        58       135        60
OIR    2025250     91400   18.0500 -111.1400      17.1        57       140        60
OIR    2025250     91400   18.0500 -111.1500      17.0        57       142        60
OIR    2025250     91400   18.0500 -111.3400      14.9        61       143        60
OIR    2025250     91400   18.0500 -111.3500      14.8        61       141        60
OIR    2025250     91400   18.0500 -111.3600      14.6        62       140        60
OIR    2025250     91400   18.0500 -111.3700      14.6        62       139        60
OIR    2025250     91400   18.0500 -111.3800      14.6        62       137        60
OIR    2025250     91400   18.0500 -111.3900      14.6        62       134        60
OIR    2025250     91400   18.0500 -111.4000      14.6        62       132        60
OIR    2025250     91400   18.0500 -111.4100      14.5        62       132        60
OIR    2025250     91400   18.0500 -111.4200      14.5        63       132        60
OIR    2025250     91400   18.0500 -111.4300      14.4        63       132        60
OIR    2025250     91400   18.0500 -111.4400      14.2        63       131        60
OIR    2025250     91400   18.0500 -111.4500      13.8        63       130        60
OIR    2025250     91400   18.0500 -111.4600      13.4        64       129        60
OIR    2025250     91400   18.0500 -111.4700      13.0        64       128        60
OIR    2025250     91400   18.0500 -111.4800      12.7        65       128        60
OIR    2025250     91400   18.0500 -111.4900      12.3        66       127        60
OIR    2025250     91400   18.0500 -111.5000      12.1        66       126        60
OIR    2025250     91400   18.0500 -111.5100      11.9        66       125        60
OIR    2025250     91400   18.0500 -111.5200      11.8        66       123        60
OIR    2025250     91400   18.0500 -111.5300      11.7        67       121        60
OIR    2025250     91400   18.0500 -111.5400      11.5        67       119        60
OIR    2025250     91400   18.0500 -111.5500      11.5        67       117        60
OIR    2025250     91400   18.0500 -111.5600      11.3        67       117        60
OIR    2025250     91400   18.0500 -111.5700      11.3        67       116        60
OIR    2025250     91400   18.0500 -111.5800      11.2        67       116        60
OIR    2025250     91400   18.0500 -111.5900      11.2        67       116        60
OIR    2025250     91400   18.0500 -111.6000      11.2        67       114        60
OIR    2025250     91400   18.0500 -111.6100      11.1        67       112        60
OIR    2025250     91400   18.0500 -111.6200      11.0        67       115        60
OIR    2025250     91400   18.0500 -111.6300      10.9        67       116        60
OIR    2025250     91400   18.0500 -111.6400      10.8        67       116        60
OIR    2025250     91400   18.0500 -111.6500      10.8        67       115        60
OIR    2025250     91400   18.0500 -111.6600      10.8        68       114        60
OIR    2025250     91400   18.0500 -111.6700      10.8        68       112        60
OIR    2025250     91400   18.0500 -111.6800      10.8        68       109        60
OIR    2025250     91400   18.0500 -111.6900      10.8        67       109        60
OIR    2025250     91400   18.0500 -111.7000      10.8        67       109        60
OIR    2025250     91400   18.0500 -111.7100      10.8        67       110        60
OIR    2025250     91400   18.0500 -111.7200      10.8        67       111        60
OIR    2025250     91400   18.0500 -111.7300      10.8        67       112        60
OIR    2025250     91400   18.0500 -111.7400      10.8        67       114        60
OIR    2025250     91400   18.0500 -111.7500      10.8        67       116        60
OIR    2025250     91400   18.0500 -111.7600      10.8        66       116        60
OIR    2025250     91400   18.0500 -111.7700      10.8        66       116        60
OIR    2025250     91400   18.0500 -111.7800      10.9        65       115        60
OIR    2025250     91400   18.0500 -111.7900      11.0        65       113        60
OIR    2025250     91400   18.0500 -111.8000      11.2        64       111        60
OIR    2025250     91400   18.0500 -111.8100      11.3        63       111        60
OIR    2025250     91400   18.0500 -111.8200      11.3        62       110        60
OIR    2025250     91400   18.0500 -111.8300      11.3        62       113        60
OIR    2025250     91400   18.0500 -111.8400      11.3        62       117        60
OIR    2025250     91400   18.0500 -111.8500      11.3        61       124        60
OIR    2025250     91400   18.0500 -111.8600      11.1        59       130        60
OIR    2025250     91400   18.0500 -111.8700      10.8        56       134        60
OIR    2025250     91400   18.0500 -111.8800      10.6        55       134        60
OIR    2025250     91400   18.0500 -111.8900      10.5        53       134        60
OIR    2025250     91400   18.0500 -111.9000      10.4        53       134        60
OIR    2025250     91400   18.0500 -111.9100      10.4        53       134        60
OIR    2025250     91400   18.0500 -111.9200      10.4        53       133        60
OIR    2025250     91400   18.0500 -111.9300      10.3        53       133        60
OIR    2025250     91400   18.0500 -111.9400      10.3        53       132        60
OIR    2025250     91400   18.0500 -111.9500      10.2        54       132        60
OIR    2025250     91400   18.0500 -111.9600      10.1        56       131        60
OIR    2025250     91400   18.0500 -111.9700      10.0        58       130        60
OIR    2025250     91400   18.0500 -111.9800       9.8        64       129        60
OIR    2025250     91400   18.0500 -111.9900       9.9        73       127        60
OIR    2025250     91400   18.0500 -112.0000      10.2        78       124        60
OIR    2025250     91400   18.0500 -112.0100      10.4        79       122        60
OIR    2025250     91400   18.0500 -112.0200      10.4        80       120        60
OIR    2025250     91400   18.0500 -112.0300      10.5        81       117        60
OIR    2025250     91400   18.0500 -112.0400      10.5        82       116        60
OIR    2025250     91400   18.0500 -112.0500      10.4        83       113        60
OIR    2025250     91400   18.0500 -112.0600      10.4        84       111        60
OIR    2025250     91400   18.0500 -112.0700      10.3        84       109        60
OIR    2025250     91400   18.0500 -112.0800      10.3        85       108        60
OIR    2025250     91400   18.0500 -112.0900      10.2        85       105        60
OIR    2025250     91400   18.0500 -112.1000      10.2        84       104        60
OIR    2025250     91400   18.0500 -112.1100      10.2        84       104        60
OIR    2025250     91400   18.0500 -112.1200      10.1        84       104        60
OIR    2025250     91400   18.0500 -112.1300      10.0        84       104        60
OIR    2025250     91400   18.0500 -112.1400       9.9        84       105        60
OIR    2025250     91400   18.0500 -112.1500       9.9        84       108        60
OIR    2025250     91400   18.0500 -112.1600       9.9        84       111        60
OIR    2025250     91400   18.0500 -112.1700       9.9        84       114        60
OIR    2025250     91400   18.0500 -112.1800       9.9        84       116        60
OIR    2025250     91400   18.0500 -112.1900       9.9        84       117        60
OIR    2025250     91400   18.0500 -112.2000       9.9        84       116        60
OIR    2025250     91400   18.0500 -112.2100       9.9        84       115        60
OIR    2025250     91400   18.0500 -112.2200       9.9        84       113        60
OIR    2025250     91400   18.0500 -112.2300       9.9        84       109        60
OIR    2025250     91400   18.0500 -112.2400       9.9        84       104        60
OIR    2025250     91400   18.0500 -112.2500       9.9        84       104        60
OIR    2025250     91400   18.0500 -112.2600      10.1        87       103        60
OIR    2025250     91400   18.0500 -112.2700      10.4        91       104        60
OIR    2025250     91400   18.0500 -112.2800      10.8        96       104        60
OIR    2025250     91400   18.0500 -112.2900      11.0        99       107        60
OIR    2025250     91400   18.0500 -112.3000      11.0       101       108        60
OIR    2025250     91400   18.0500 -112.3100      11.2       102       109        60
OIR    2025250     91400   18.0500 -112.3200      11.3       103       110        60
OIR    2025250     91400   18.0500 -112.3300      11.4       104       111        60
OIR    2025250     91400   18.0500 -112.3400      11.5       105       112        60
OIR    2025250     91400   18.0500 -112.3500      11.6       105       113        60
OIR    2025250     91400   18.0500 -112.3600      11.6       106       115        60
OIR    2025250     91400   18.0500 -112.3700      11.7       106       117        60
OIR    2025250     91400   18.0500 -112.3800      11.7       107       120        60
OIR    2025250     91400   18.0500 -112.3900      11.8       108       119        60
OIR    2025250     91400   18.0500 -112.4000      11.8       109       119        60
OIR    2025250     91400   18.0500 -112.4100      11.8       110       116        60
OIR    2025250     91400   18.0500 -112.4200      11.8       112       114        60
OIR    2025250     91400   18.0500 -112.4300      10.1       125       111        60
OIR    2025250     91400   18.0500 -112.4400       9.9       129       110        60
OIR    2025250     91400   18.0500 -112.4500      10.0       129       109        60
OIR    2025250     91400   18.0500 -112.4600      10.0       129       107        60
OIR    2025250     91400   18.0500 -112.4700      10.0       129       104        60
OIR    2025250     91400   18.0500 -112.4800      10.0       129       105        60
OIR    2025250     91400   18.0500 -112.4900      10.0       129       105        60
OIR    2025250     91400   18.0500 -112.5000       9.7       129       107        60
OIR    2025250     91400   18.0500 -112.5100       8.8       127       109        60
OIR    2025250     91400   18.0500 -112.5200       7.7       125       110        60
OIR    2025250     91400   18.0500 -112.5300       7.3       124       114        60
OIR    2025250     91400   18.0500 -112.5400       7.0       123       116        60
OIR    2025250     91400   18.0500 -112.5500       6.8       124       115        60
OIR    2025250     91400   18.0500 -112.5600       6.4       126       113        60
OIR    2025250     91400   18.0500 -112.5700       6.0       128       113        60
OIR    2025250     91400   18.0500 -112.5800       5.5       131       114        60
OIR    2025250     91400   18.0500 -112.5900       4.6       137       114        60
OIR    2025250     91400   18.0500 -112.6000       4.4       141       115        60
OIR    2025250     91400   18.0500 -112.6100       4.4       142       116        60
OIR    2025250     91400   18.0500 -112.6200       4.3       143       116        60
OIR    2025250     91400   18.0500 -112.6300       4.3       144       117        60
OIR    2025250     91400   18.0500 -112.6400       4.4       145       119        60
OIR    2025250     91400   18.0500 -112.6500       4.4       145       119        60
OIR    2025250     91400   18.0500 -112.6600       4.4       145       119        60
OIR    2025250     91400   18.0500 -112.6700       4.5       145       116        60
OIR    2025250     91400   18.0500 -112.6800       4.5       146       116        60
OIR    2025250     91400   18.0500 -112.6900       4.6       146       119        60
OIR    2025250     91400   18.0500 -112.7000       4.6       146       122        60
OIR    2025250     91400   18.0500 -112.7100       4.6       146       124        60
OIR    2025250     91400   18.0500 -112.7200       4.6       147       126        60
OIR    2025250     91400   18.0500 -112.7300       4.7       147       128        60
OIR    2025250     91400   18.0500 -112.7400       4.7       147       130        60
OIR    2025250     91400   18.0500 -112.7500       4.7       148       132        60
OIR    2025250     91400   18.0500 -112.7600       4.6       148       133        60
OIR    2025250     91400   18.0500 -112.7700       4.6       148       134        60
OIR    2025250     91400   18.0500 -112.7800       4.6       148       135        60
OIR    2025250     91400   18.0500 -112.7900       4.5       147       135        60
OIR    2025250     91400   18.0500 -112.8000       4.4       147       134        60
OIR    2025250     91400   18.0500 -112.8100       4.3       148       134        60
OIR    2025250     91400   18.0500 -112.8200       4.2       148       134        60
OIR    2025250     91400   18.0500 -112.8300       4.2       148       134        60
OIR    2025250     91400   18.0500 -112.8400       4.2       148       135        60
OIR    2025250     91400   18.0500 -112.8500       4.2       148       136        60
OIR    2025250     91400   18.0500 -112.8600       4.1       148       137        60
OIR    2025250     91400   18.0500 -112.8700       4.1       148       140        60
OIR    2025250     91400   18.0500 -113.2100       4.0        94       141        60
OIR    2025250     91400   18.0500 -113.2200       4.0        94       143        60
OIR    2025250     91400   18.0500 -113.2300       4.1        95       145        60
OIR    2025250     91400   18.0500 -113.2600       4.3        96       143        60
OIR    2025250     91400   18.0500 -113.2700       4.3        96       138        60
OIR    2025250     91400   18.0500 -113.2800       4.3        96       135        60
OIR    2025250     91400   18.0500 -113.2900       4.3        96       135        60
OIR    2025250     91400   18.0500 -113.3000       4.3        95       134        60
OIR    2025250     91400   18.0500 -113.3100       4.4        95       133        60
OIR    2025250     91400   18.0500 -113.3200       4.4        95       133        60
OIR    2025250     91400   18.0500 -113.3300       4.4        95       134        60
OIR    2025250     91400   18.0500 -113.3400       4.5        94       136        60
OIR    2025250     91400   18.0500 -113.3500       4.6        94       138        60
OIR    2025250     91400   18.0500 -113.3600       5.0        95       139        60
OIR    2025250     91400   18.0500 -113.3700       6.0        98       140        60
OIR    2025250     91400   18.0500 -113.3800       6.4       100       144        60
OIR    2025250     91400   18.0500 -114.3400       4.6       294       142        60
OIR    2025250     91400   18.0500 -114.3500       4.6       294       141        60
OIR    2025250     91400   18.0500 -114.3600       4.6       294       142        60
OIR    2025250     91400   18.0500 -114.3700       4.6       294       142        60
OIR    2025250     91400   18.0500 -114.3800       4.6       294       142        60
OIR    2025250     91400   18.0500 -114.3900       4.6       294       142        60
OIR    2025250     91400   18.0500 -114.4000       4.5       294       142        60
OIR    2025250     91400   18.0500 -114.4100       4.5       293       142        60
OIR    2025250     91400   18.0500 -114.4200       4.5       293       142        60
OIR    2025250     91400   18.0500 -114.4300       4.5       293       141        60
OIR    2025250     91400   18.0500 -114.4400       4.5       293       141        60
OIR    2025250     91400   18.0500 -114.4500       4.5       293       143        60
OIR    2025250     91400   18.0400 -110.3700      14.2        43       143        60
OIR    2025250     91400   18.0400 -110.3800      14.3        45       142        60
OIR    2025250     91400   18.0400 -110.3900      14.5        47       140        60
OIR    2025250     91400   18.0400 -110.4000      14.8        49       138        60
OIR    2025250     91400   18.0400 -110.4100      15.0        49       137        60
OIR    2025250     91400   18.0400 -110.4200      15.1        50       136        60
OIR    2025250     91400   18.0400 -110.4300      15.3        50       135        60
OIR    2025250     91400   18.0400 -110.4400      15.4        50       134        60
OIR    2025250     91400   18.0400 -110.4500      15.6        51       133        60
OIR    2025250     91400   18.0400 -110.4600      15.7        51       132        60
OIR    2025250     91400   18.0400 -110.4700      15.8        52       131        60
OIR    2025250     91400   18.0400 -110.4800      15.9        52       130        60
OIR    2025250     91400   18.0400 -110.4900      16.0        52       127        60
OIR    2025250     91400   18.0400 -110.5000      16.0        52       124        60
OIR    2025250     91400   18.0400 -110.5100      16.1        53       121        60
OIR    2025250     91400   18.0400 -110.5200      16.1        53       119        60
OIR    2025250     91400   18.0400 -110.5300      16.2        53       119        60
OIR    2025250     91400   18.0400 -110.5400      16.2        53       120        60
OIR    2025250     91400   18.0400 -110.5500      16.3        53       120        60
OIR    2025250     91400   18.0400 -110.5600      16.3        53       119        60
OIR    2025250     91400   18.0400 -110.5700      16.4        53       119        60
OIR    2025250     91400   18.0400 -110.5800      16.4        53       123        60
OIR    2025250     91400   18.0400 -110.5900      16.4        54       128        60
OIR    2025250     91400   18.0400 -110.6000      16.4        54       132        60
OIR    2025250     91400   18.0400 -110.6100      16.4        54       135        60
OIR    2025250     91400   18.0400 -110.6200      16.4        54       138        60
OIR    2025250     91400   18.0400 -110.6300      16.4        54       142        60
OIR    2025250     91400   18.0400 -111.0500      17.8        58       142        60
OIR    2025250     91400   18.0400 -111.0600      18.1        58       136        60
OIR    2025250     91400   18.0400 -111.0700      18.3        59       131        60
OIR    2025250     91400   18.0400 -111.0800      18.1        59       130        60
OIR    2025250     91400   18.0400 -111.0900      17.7        58       131        60
OIR    2025250     91400   18.0400 -111.1000      17.4        58       131        60
OIR    2025250     91400   18.0400 -111.1100      17.2        58       131        60
OIR    2025250     91400   18.0400 -111.1200      17.1        58       132        60
OIR    2025250     91400   18.0400 -111.1300      17.1        58       135        60
OIR    2025250     91400   18.0400 -111.1400      17.1        57       138        60
OIR    2025250     91400   18.0400 -111.1500      17.0        57       141        60
OIR    2025250     91400   18.0400 -111.3500      14.9        61       142        60
OIR    2025250     91400   18.0400 -111.3600      14.8        62       140        60
OIR    2025250     91400   18.0400 -111.3700      14.7        62       138        60
OIR    2025250     91400   18.0400 -111.3800      14.7        62       136        60
OIR    2025250     91400   18.0400 -111.3900      14.7        62       132        60
OIR    2025250     91400   18.0400 -111.4000      14.7        63       129        60
OIR    2025250     91400   18.0400 -111.4100      14.6        63       129        60
OIR    2025250     91400   18.0400 -111.4200      14.5        63       130        60
OIR    2025250     91400   18.0400 -111.4300      14.5        63       130        60
OIR    2025250     91400   18.0400 -111.4400      14.3        63       130        60
OIR    2025250     91400   18.0400 -111.4500      13.9        64       130        60
OIR    2025250     91400   18.0400 -111.4600      13.6        64       128        60
OIR    2025250     91400   18.0400 -111.4700      13.2        65       126        60
OIR    2025250     91400   18.0400 -111.4800      12.9        65       126        60
OIR    2025250     91400   18.0400 -111.4900      12.5        66       126        60
OIR    2025250     91400   18.0400 -111.5000      12.2        66       126        60
OIR    2025250     91400   18.0400 -111.5100      12.0        66       125        60
OIR    2025250     91400   18.0400 -111.5200      11.8        67       123        60
OIR    2025250     91400   18.0400 -111.5300      11.7        67       122        60
OIR    2025250     91400   18.0400 -111.5400      11.6        67       120        60
OIR    2025250     91400   18.0400 -111.5500      11.5        67       119        60
OIR    2025250     91400   18.0400 -111.5600      11.4        67       117        60
OIR    2025250     91400   18.0400 -111.5700      11.3        67       116        60
OIR    2025250     91400   18.0400 -111.5800      11.2        67       116        60
OIR    2025250     91400   18.0400 -111.5900      11.2        67       115        60
OIR    2025250     91400   18.0400 -111.6000      11.2        67       114        60
OIR    2025250     91400   18.0400 -111.6100      11.1        67       112        60
OIR    2025250     91400   18.0400 -111.6200      11.1        67       114        60
OIR    2025250     91400   18.0400 -111.6300      11.0        67       116        60
OIR    2025250     91400   18.0400 -111.6400      10.9        67       117        60
OIR    2025250     91400   18.0400 -111.6500      10.8        67       117        60
OIR    2025250     91400   18.0400 -111.6600      10.8        67       116        60
OIR    2025250     91400   18.0400 -111.6700      10.8        67       116        60
OIR    2025250     91400   18.0400 -111.6800      10.8        67       114        60
OIR    2025250     91400   18.0400 -111.6900      10.8        67       112        60
OIR    2025250     91400   18.0400 -111.7000      10.8        67       112        60
OIR    2025250     91400   18.0400 -111.7100      10.8        67       111        60
OIR    2025250     91400   18.0400 -111.7200      10.8        67       112        60
OIR    2025250     91400   18.0400 -111.7300      10.8        67       113        60
OIR    2025250     91400   18.0400 -111.7400      10.8        67       115        60
OIR    2025250     91400   18.0400 -111.7500      10.8        67       117        60
OIR    2025250     91400   18.0400 -111.7600      10.8        66       117        60
OIR    2025250     91400   18.0400 -111.7700      10.8        66       116        60
OIR    2025250     91400   18.0400 -111.7800      10.9        65       114        60
OIR    2025250     91400   18.0400 -111.7900      11.1        65       112        60
OIR    2025250     91400   18.0400 -111.8000      11.2        64       110        60
OIR    2025250     91400   18.0400 -111.8100      11.3        63       110        60
OIR    2025250     91400   18.0400 -111.8200      11.3        62       110        60
OIR    2025250     91400   18.0400 -111.8300      11.4        62       113        60
OIR    2025250     91400   18.0400 -111.8400      11.4        62       116        60
OIR    2025250     91400   18.0400 -111.8500      11.4        61       122        60
OIR    2025250     91400   18.0400 -111.8600      11.4        60       129        60
OIR    2025250     91400   18.0400 -111.8700      11.1        58       135        60
OIR    2025250     91400   18.0400 -111.8800      10.8        55       135        60
OIR    2025250     91400   18.0400 -111.8900      10.6        54       135        60
OIR    2025250     91400   18.0400 -111.9000      10.6        53       134        60
OIR    2025250     91400   18.0400 -111.9100      10.5        53       133        60
OIR    2025250     91400   18.0400 -111.9200      10.5        53       132        60
OIR    2025250     91400   18.0400 -111.9300      10.5        53       130        60
OIR    2025250     91400   18.0400 -111.9400      10.5        53       129        60
OIR    2025250     91400   18.0400 -111.9500      10.4        54       128        60
OIR    2025250     91400   18.0400 -111.9600      10.2        56       128        60
OIR    2025250     91400   18.0400 -111.9700      10.1        57       127        60
OIR    2025250     91400   18.0400 -111.9800      10.0        61       127        60
OIR    2025250     91400   18.0400 -111.9900      10.0        71       127        60
OIR    2025250     91400   18.0400 -112.0000      10.2        76       123        60
OIR    2025250     91400   18.0400 -112.0100      10.4        78       120        60
OIR    2025250     91400   18.0400 -112.0200      10.5        79       117        60
OIR    2025250     91400   18.0400 -112.0300      10.6        81       115        60
OIR    2025250     91400   18.0400 -112.0400      10.7        82       113        60
OIR    2025250     91400   18.0400 -112.0500      10.7        83       111        60
OIR    2025250     91400   18.0400 -112.0600      10.6        83       108        60
OIR    2025250     91400   18.0400 -112.0700      10.6        84       107        60
OIR    2025250     91400   18.0400 -112.0800      10.5        84       104        60
OIR    2025250     91400   18.0400 -112.0900      10.3        84       104        60
OIR    2025250     91400   18.0400 -112.1000      10.3        84       103        60
OIR    2025250     91400   18.0400 -112.1100      10.3        84       103        60
OIR    2025250     91400   18.0400 -112.1200      10.2        83       103        60
OIR    2025250     91400   18.0400 -112.1300      10.1        83       103        60
OIR    2025250     91400   18.0400 -112.1400      10.0        83       104        60
OIR    2025250     91400   18.0400 -112.1500      10.0        84       104        60
OIR    2025250     91400   18.0400 -112.1600       9.9        84       107        60
OIR    2025250     91400   18.0400 -112.1700       9.9        84       109        60
OIR    2025250     91400   18.0400 -112.1800       9.9        84       113        60
OIR    2025250     91400   18.0400 -112.1900       9.9        84       116        60
OIR    2025250     91400   18.0400 -112.2000       9.9        84       116        60
OIR    2025250     91400   18.0400 -112.2100       9.9        84       114        60
OIR    2025250     91400   18.0400 -112.2200       9.9        84       111        60
OIR    2025250     91400   18.0400 -112.2300       9.9        84       108        60
OIR    2025250     91400   18.0400 -112.2400       9.9        84       104        60
OIR    2025250     91400   18.0400 -112.2500       9.9        84       104        60
OIR    2025250     91400   18.0400 -112.2600      10.0        85       103        60
OIR    2025250     91400   18.0400 -112.2700      10.3        87       104        60
OIR    2025250     91400   18.0400 -112.2800      10.5        92       105        60
OIR    2025250     91400   18.0400 -112.2900      10.7        96       108        60
OIR    2025250     91400   18.0400 -112.3000      10.8        99       109        60
OIR    2025250     91400   18.0400 -112.3100      11.0       100       110        60
OIR    2025250     91400   18.0400 -112.3200      11.1       101       111        60
OIR    2025250     91400   18.0400 -112.3300      11.2       102       112        60
OIR    2025250     91400   18.0400 -112.3400      11.3       103       114        60
OIR    2025250     91400   18.0400 -112.3500      11.4       104       114        60
OIR    2025250     91400   18.0400 -112.3600      11.4       105       114        60
OIR    2025250     91400   18.0400 -112.3700      11.5       106       116        60
OIR    2025250     91400   18.0400 -112.3800      11.6       107       119        60
OIR    2025250     91400   18.0400 -112.3900      11.6       108       117        60
OIR    2025250     91400   18.0400 -112.4000      11.7       109       116        60
OIR    2025250     91400   18.0400 -112.4100      11.7       111       115        60
OIR    2025250     91400   18.0400 -112.4200      11.4       113       112        60
OIR    2025250     91400   18.0400 -112.4300      10.0       124       110        60
OIR    2025250     91400   18.0400 -112.4400       9.9       128       109        60
OIR    2025250     91400   18.0400 -112.4500       9.9       129       108        60
OIR    2025250     91400   18.0400 -112.4600       9.9       129       105        60
OIR    2025250     91400   18.0400 -112.4700      10.0       129       104        60
OIR    2025250     91400   18.0400 -112.4800       9.9       129       104        60
OIR    2025250     91400   18.0400 -112.4900       9.8       128       104        60
OIR    2025250     91400   18.0400 -112.5000       9.5       128       105        60
OIR    2025250     91400   18.0400 -112.5100       8.7       126       107        60
OIR    2025250     91400   18.0400 -112.5200       7.9       125       108        60
OIR    2025250     91400   18.0400 -112.5300       7.5       124       110        60
OIR    2025250     91400   18.0400 -112.5400       7.1       124       112        60
OIR    2025250     91400   18.0400 -112.5500       6.9       124       112        60
OIR    2025250     91400   18.0400 -112.5600       6.5       125       112        60
OIR    2025250     91400   18.0400 -112.5700       6.0       128       112        60
OIR    2025250     91400   18.0400 -112.5800       5.3       131       113        60
OIR    2025250     91400   18.0400 -112.5900       4.6       138       114        60
OIR    2025250     91400   18.0400 -112.6000       4.4       141       115        60
OIR    2025250     91400   18.0400 -112.6100       4.3       143       116        60
OIR    2025250     91400   18.0400 -112.6200       4.3       144       116        60
OIR    2025250     91400   18.0400 -112.6300       4.3       145       116        60
OIR    2025250     91400   18.0400 -112.6400       4.3       146       117        60
OIR    2025250     91400   18.0400 -112.6500       4.3       146       120        60
OIR    2025250     91400   18.0400 -112.6600       4.4       146       122        60
OIR    2025250     91400   18.0400 -112.6700       4.5       146       120        60
OIR    2025250     91400   18.0400 -112.6800       4.5       146       117        60
OIR    2025250     91400   18.0400 -112.6900       4.6       146       121        60
OIR    2025250     91400   18.0400 -112.7000       4.6       146       124        60
OIR    2025250     91400   18.0400 -112.7100       4.6       146       125        60
OIR    2025250     91400   18.0400 -112.7200       4.6       147       125        60
OIR    2025250     91400   18.0400 -112.7300       4.6       147       125        60
OIR    2025250     91400   18.0400 -112.7400       4.6       147       128        60
OIR    2025250     91400   18.0400 -112.7500       4.6       148       130        60
OIR    2025250     91400   18.0400 -112.7600       4.6       148       132        60
OIR    2025250     91400   18.0400 -112.7700       4.6       148       133        60
OIR    2025250     91400   18.0400 -112.7800       4.5       147       134        60
OIR    2025250     91400   18.0400 -112.7900       4.4       147       134        60
OIR    2025250     91400   18.0400 -112.8000       4.3       147       135        60
OIR    2025250     91400   18.0400 -112.8100       4.3       147       134        60
OIR    2025250     91400   18.0400 -112.8200       4.2       148       133        60
OIR    2025250     91400   18.0400 -112.8300       4.2       148       134        60
OIR    2025250     91400   18.0400 -112.8400       4.1       149       135        60
OIR    2025250     91400   18.0400 -112.8500       4.1       149       136        60
OIR    2025250     91400   18.0400 -112.8600       4.1       149       137        60
OIR    2025250     91400   18.0400 -112.8700       4.1       148       139        60
OIR    2025250     91400   18.0400 -113.2700       4.3        96       143        60
OIR    2025250     91400   18.0400 -113.2800       4.3        96       139        60
OIR    2025250     91400   18.0400 -113.2900       4.3        96       138        60
OIR    2025250     91400   18.0400 -113.3000       4.3        96       137        60
OIR    2025250     91400   18.0400 -113.3100       4.4        95       137        60
OIR    2025250     91400   18.0400 -113.3200       4.4        95       137        60
OIR    2025250     91400   18.0400 -113.3300       4.5        94       138        60
OIR    2025250     91400   18.0400 -113.3400       4.5        94       140        60
OIR    2025250     91400   18.0400 -113.3500       4.6        94       142        60
OIR    2025250     91400   18.0400 -113.3600       5.0        94       142        60
OIR    2025250     91400   18.0400 -113.3700       6.1        97       143        60
OIR    2025250     91400   18.0400 -114.3500       4.6       294       142        60
OIR    2025250     91400   18.0400 -114.3900       4.5       293       144        60
OIR    2025250     91400   18.0400 -114.4000       4.5       293       142        60
OIR    2025250     91400   18.0400 -114.4100       4.5       293       140        60
OIR    2025250     91400   18.0400 -114.4200       4.5       293       139        60
OIR    2025250     91400   18.0400 -114.4300       4.5       293       141        60
OIR    2025250     91400   18.0400 -114.4400       4.5       293       142        60
OIR    2025250     91400   18.0300 -110.3500      13.7        39       143        60
OIR    2025250     91400   18.0300 -110.3600      13.9        41       141        60
OIR    2025250     91400   18.0300 -110.3700      14.0        44       140        60
OIR    2025250     91400   18.0300 -110.3800      14.2        46       140        60
OIR    2025250     91400   18.0300 -110.3900      14.4        48       138        60
OIR    2025250     91400   18.0300 -110.4000      14.6        49       135        60
OIR    2025250     91400   18.0300 -110.4100      14.9        50       133        60
OIR    2025250     91400   18.0300 -110.4200      15.1        50       133        60
OIR    2025250     91400   18.0300 -110.4300      15.2        50       133        60
OIR    2025250     91400   18.0300 -110.4400      15.4        51       133        60
OIR    2025250     91400   18.0300 -110.4500      15.5        51       133        60
OIR    2025250     91400   18.0300 -110.4600      15.7        51       133        60
OIR    2025250     91400   18.0300 -110.4700      15.8        52       132        60
OIR    2025250     91400   18.0300 -110.4800      15.9        52       132        60
OIR    2025250     91400   18.0300 -110.4900      15.9        52       130        60
OIR    2025250     91400   18.0300 -110.5000      16.0        53       128        60
OIR    2025250     91400   18.0300 -110.5100      16.1        53       125        60
OIR    2025250     91400   18.0300 -110.5200      16.1        53       121        60
OIR    2025250     91400   18.0300 -110.5300      16.2        53       120        60
OIR    2025250     91400   18.0300 -110.5400      16.2        53       122        60
OIR    2025250     91400   18.0300 -110.5500      16.2        53       124        60
OIR    2025250     91400   18.0300 -110.5600      16.3        53       122        60
OIR    2025250     91400   18.0300 -110.5700      16.3        54       120        60
OIR    2025250     91400   18.0300 -110.5800      16.3        54       122        60
OIR    2025250     91400   18.0300 -110.5900      16.3        54       128        60
OIR    2025250     91400   18.0300 -110.6000      16.3        54       133        60
OIR    2025250     91400   18.0300 -110.6100      16.3        54       136        60
OIR    2025250     91400   18.0300 -110.6200      16.3        54       138        60
OIR    2025250     91400   18.0300 -110.6300      16.3        54       141        60
OIR    2025250     91400   18.0300 -111.0600      18.7        60       139        60
OIR    2025250     91400   18.0300 -111.0700      18.9        60       132        60
OIR    2025250     91400   18.0300 -111.0800      18.9        60       129        60
OIR    2025250     91400   18.0300 -111.0900      18.5        60       130        60
OIR    2025250     91400   18.0300 -111.1000      17.9        59       131        60
OIR    2025250     91400   18.0300 -111.1100      17.4        58       132        60
OIR    2025250     91400   18.0300 -111.1200      17.2        58       134        60
OIR    2025250     91400   18.0300 -111.1300      17.1        58       135        60
OIR    2025250     91400   18.0300 -111.1400      17.1        58       137        60
OIR    2025250     91400   18.0300 -111.1500      17.0        57       139        60
OIR    2025250     91400   18.0300 -111.1600      17.0        57       144        60
OIR    2025250     91400   18.0300 -111.3600      14.9        62       141        60
OIR    2025250     91400   18.0300 -111.3700      14.9        62       138        60
OIR    2025250     91400   18.0300 -111.3800      14.8        62       134        60
OIR    2025250     91400   18.0300 -111.3900      14.8        63       131        60
OIR    2025250     91400   18.0300 -111.4000      14.8        63       127        60
OIR    2025250     91400   18.0300 -111.4100      14.7        63       127        60
OIR    2025250     91400   18.0300 -111.4200      14.7        63       129        60
OIR    2025250     91400   18.0300 -111.4300      14.6        63       130        60
OIR    2025250     91400   18.0300 -111.4400      14.4        64       130        60
OIR    2025250     91400   18.0300 -111.4500      14.1        64       130        60
OIR    2025250     91400   18.0300 -111.4600      13.7        65       130        60
OIR    2025250     91400   18.0300 -111.4700      13.4        66       130        60
OIR    2025250     91400   18.0300 -111.4800      13.1        66       129        60
OIR    2025250     91400   18.0300 -111.4900      12.7        67       129        60
OIR    2025250     91400   18.0300 -111.5000      12.4        67       127        60
OIR    2025250     91400   18.0300 -111.5100      12.1        67       125        60
OIR    2025250     91400   18.0300 -111.5200      11.9        67       122        60
OIR    2025250     91400   18.0300 -111.5300      11.8        67       121        60
OIR    2025250     91400   18.0300 -111.5400      11.6        67       120        60
OIR    2025250     91400   18.0300 -111.5500      11.5        67       117        60
OIR    2025250     91400   18.0300 -111.5600      11.4        67       116        60
OIR    2025250     91400   18.0300 -111.5700      11.3        67       115        60
OIR    2025250     91400   18.0300 -111.5800      11.3        67       114        60
OIR    2025250     91400   18.0300 -111.5900      11.2        67       113        60
OIR    2025250     91400   18.0300 -111.6000      11.2        67       113        60
OIR    2025250     91400   18.0300 -111.6100      11.1        67       112        60
OIR    2025250     91400   18.0300 -111.6200      11.0        67       113        60
OIR    2025250     91400   18.0300 -111.6300      11.0        67       116        60
OIR    2025250     91400   18.0300 -111.6400      10.9        67       116        60
OIR    2025250     91400   18.0300 -111.6500      10.9        67       117        60
OIR    2025250     91400   18.0300 -111.6600      10.8        67       117        60
OIR    2025250     91400   18.0300 -111.6700      10.8        67       117        60
OIR    2025250     91400   18.0300 -111.6800      10.8        67       116        60
OIR    2025250     91400   18.0300 -111.6900      10.8        67       116        60
OIR    2025250     91400   18.0300 -111.7000      10.8        67       114        60
OIR    2025250     91400   18.0300 -111.7100      10.8        67       113        60
OIR    2025250     91400   18.0300 -111.7200      10.8        67       114        60
OIR    2025250     91400   18.0300 -111.7300      10.8        67       114        60
OIR    2025250     91400   18.0300 -111.7400      10.8        67       116        60
OIR    2025250     91400   18.0300 -111.7500      10.8        67       120        60
OIR    2025250     91400   18.0300 -111.7600      10.8        66       120        60
OIR    2025250     91400   18.0300 -111.7700      10.8        66       116        60
OIR    2025250     91400   18.0300 -111.7800      10.9        65       113        60
OIR    2025250     91400   18.0300 -111.7900      11.1        65       111        60
OIR    2025250     91400   18.0300 -111.8000      11.3        64       109        60
OIR    2025250     91400   18.0300 -111.8100      11.4        64       110        60
OIR    2025250     91400   18.0300 -111.8200      11.4        63       111        60
OIR    2025250     91400   18.0300 -111.8300      11.4        62       112        60
OIR    2025250     91400   18.0300 -111.8400      11.4        62       116        60
OIR    2025250     91400   18.0300 -111.8500      11.5        61       121        60
OIR    2025250     91400   18.0300 -111.8600      11.5        61       128        60
OIR    2025250     91400   18.0300 -111.8700      11.5        59       136        60
OIR    2025250     91400   18.0300 -111.8800      11.2        57       136        60
OIR    2025250     91400   18.0300 -111.8900      10.8        55       136        60
OIR    2025250     91400   18.0300 -111.9000      10.6        53       135        60
OIR    2025250     91400   18.0300 -111.9100      10.6        53       133        60
OIR    2025250     91400   18.0300 -111.9200      10.6        52       132        60
OIR    2025250     91400   18.0300 -111.9300      10.6        53       129        60
OIR    2025250     91400   18.0300 -111.9400      10.6        53       125        60
OIR    2025250     91400   18.0300 -111.9500      10.6        54       125        60
OIR    2025250     91400   18.0300 -111.9600      10.5        55       125        60
OIR    2025250     91400   18.0300 -111.9700      10.4        58       125        60
OIR    2025250     91400   18.0300 -111.9800      10.2        62       126        60
OIR    2025250     91400   18.0300 -111.9900      10.2        72       126        60
OIR    2025250     91400   18.0300 -112.0000      10.4        75       124        60
OIR    2025250     91400   18.0300 -112.0100      10.5        77       121        60
OIR    2025250     91400   18.0300 -112.0200      10.6        79       117        60
OIR    2025250     91400   18.0300 -112.0300      10.8        81       114        60
OIR    2025250     91400   18.0300 -112.0400      10.9        82       111        60
OIR    2025250     91400   18.0300 -112.0500      10.9        82       108        60
OIR    2025250     91400   18.0300 -112.0600      10.8        83       104        60
OIR    2025250     91400   18.0300 -112.0700      10.8        83       104        60
OIR    2025250     91400   18.0300 -112.0800      10.6        83       104        60
OIR    2025250     91400   18.0300 -112.0900      10.5        82       104        60
OIR    2025250     91400   18.0300 -112.1000      10.4        82       103        60
OIR    2025250     91400   18.0300 -112.1100      10.4        81       103        60
OIR    2025250     91400   18.0300 -112.1200      10.4        81       103        60
OIR    2025250     91400   18.0300 -112.1300      10.3        81       103        60
OIR    2025250     91400   18.0300 -112.1400      10.2        82       104        60
OIR    2025250     91400   18.0300 -112.1500      10.1        82       104        60
OIR    2025250     91400   18.0300 -112.1600      10.0        83       105        60
OIR    2025250     91400   18.0300 -112.1700      10.0        83       108        60
OIR    2025250     91400   18.0300 -112.1800      10.0        84       110        60
OIR    2025250     91400   18.0300 -112.1900      10.0        84       113        60
OIR    2025250     91400   18.0300 -112.2000       9.9        84       115        60
OIR    2025250     91400   18.0300 -112.2100       9.9        84       112        60
OIR    2025250     91400   18.0300 -112.2200       9.9        84       109        60
OIR    2025250     91400   18.0300 -112.2300       9.9        84       107        60
OIR    2025250     91400   18.0300 -112.2400       9.9        84       104        60
OIR    2025250     91400   18.0300 -112.2500       9.9        84       104        60
OIR    2025250     91400   18.0300 -112.2600      10.0        85       103        60
OIR    2025250     91400   18.0300 -112.2700      10.2        86       103        60
OIR    2025250     91400   18.0300 -112.2800      10.3        87       104        60
OIR    2025250     91400   18.0300 -112.2900      10.4        89       107        60
OIR    2025250     91400   18.0300 -112.3000      10.5        92       108        60
OIR    2025250     91400   18.0300 -112.3100      10.7        96       110        60
OIR    2025250     91400   18.0300 -112.3200      10.9        98       111        60
OIR    2025250     91400   18.0300 -112.3300      11.1       100       113        60
OIR    2025250     91400   18.0300 -112.3400      11.2       101       114        60
OIR    2025250     91400   18.0300 -112.3500      11.2       102       114        60
OIR    2025250     91400   18.0300 -112.3600      11.2       104       114        60
OIR    2025250     91400   18.0300 -112.3700      11.2       105       115        60
OIR    2025250     91400   18.0300 -112.3800      11.2       106       116        60
OIR    2025250     91400   18.0300 -112.3900      11.3       107       116        60
OIR    2025250     91400   18.0300 -112.4000      11.3       109       114        60
OIR    2025250     91400   18.0300 -112.4100      11.2       111       112        60
OIR    2025250     91400   18.0300 -112.4200      10.8       114       111        60
OIR    2025250     91400   18.0300 -112.4300       9.9       119       109        60
OIR    2025250     91400   18.0300 -112.4400       9.6       125       108        60
OIR    2025250     91400   18.0300 -112.4500       9.6       127       105        60
OIR    2025250     91400   18.0300 -112.4600       9.7       128       104        60
OIR    2025250     91400   18.0300 -112.4700       9.7       128       104        60
OIR    2025250     91400   18.0300 -112.4800       9.7       128       104        60
OIR    2025250     91400   18.0300 -112.4900       9.5       127       104        60
OIR    2025250     91400   18.0300 -112.5000       9.0       126       105        60
OIR    2025250     91400   18.0300 -112.5100       8.4       125       105        60
OIR    2025250     91400   18.0300 -112.5200       8.0       124       107        60
OIR    2025250     91400   18.0300 -112.5300       7.5       124       107        60
OIR    2025250     91400   18.0300 -112.5400       7.2       124       108        60
OIR    2025250     91400   18.0300 -112.5500       7.0       124       109        60
OIR    2025250     91400   18.0300 -112.5600       6.5       125       110        60
OIR    2025250     91400   18.0300 -112.5700       5.9       128       112        60
OIR    2025250     91400   18.0300 -112.5800       5.1       132       113        60
OIR    2025250     91400   18.0300 -112.5900       4.6       137       115        60
OIR    2025250     91400   18.0300 -112.6000       4.4       140       115        60
OIR    2025250     91400   18.0300 -112.6100       4.3       142       115        60
OIR    2025250     91400   18.0300 -112.6200       4.2       144       115        60
OIR    2025250     91400   18.0300 -112.6300       4.2       145       115        60
OIR    2025250     91400   18.0300 -112.6400       4.2       147       115        60
OIR    2025250     91400   18.0300 -112.6500       4.2       148       120        60
OIR    2025250     91400   18.0300 -112.6600       4.2       147       124        60
OIR    2025250     91400   18.0300 -112.6700       4.3       147       123        60
OIR    2025250     91400   18.0300 -112.6800       4.4       146       122        60
OIR    2025250     91400   18.0300 -112.6900       4.5       146       122        60
OIR    2025250     91400   18.0300 -112.7000       4.5       146       123        60
OIR    2025250     91400   18.0300 -112.7100       4.5       146       123        60
OIR    2025250     91400   18.0300 -112.7200       4.6       147       123        60
OIR    2025250     91400   18.0300 -112.7300       4.6       147       122        60
OIR    2025250     91400   18.0300 -112.7400       4.6       147       124        60
OIR    2025250     91400   18.0300 -112.7500       4.6       147       127        60
OIR    2025250     91400   18.0300 -112.7600       4.6       147       129        60
OIR    2025250     91400   18.0300 -112.7700       4.5       147       132        60
OIR    2025250     91400   18.0300 -112.7800       4.4       146       133        60
OIR    2025250     91400   18.0300 -112.7900       4.3       146       133        60
OIR    2025250     91400   18.0300 -112.8000       4.2       146       133        60
OIR    2025250     91400   18.0300 -112.8100       4.2       146       132        60
OIR    2025250     91400   18.0300 -112.8200       4.2       147       131        60
OIR    2025250     91400   18.0300 -112.8300       4.1       148       130        60
OIR    2025250     91400   18.0300 -112.8400       4.1       148       130        60
OIR    2025250     91400   18.0300 -112.8500       4.1       148       131        60
OIR    2025250     91400   18.0300 -112.8600       4.1       149       133        60
OIR    2025250     91400   18.0300 -112.8700       4.1       149       136        60
OIR    2025250     91400   18.0300 -112.8800       4.1       148       141        60
OIR    2025250     91400   18.0300 -113.5000       4.2        43       144        60
OIR    2025250     91400   18.0300 -113.5100       4.1        38       143        60
OIR    2025250     91400   18.0300 -114.4000       4.5       293       144        60
OIR    2025250     91400   18.0300 -114.4100       4.5       293       140        60
OIR    2025250     91400   18.0300 -114.4200       4.5       293       139        60
OIR    2025250     91400   18.0300 -114.4300       4.5       293       142        60
OIR    2025250     91400   18.0200 -110.3500      13.7        41       142        60
OIR    2025250     91400   18.0200 -110.3600      13.7        43       140        60
OIR    2025250     91400   18.0200 -110.3700      13.9        46       139        60
OIR    2025250     91400   18.0200 -110.3800      14.0        47       138        60
OIR    2025250     91400   18.0200 -110.3900      14.2        48       136        60
OIR    2025250     91400   18.0200 -110.4000      14.5        49       132        60
OIR    2025250     91400   18.0200 -110.4100      14.8        50       129        60
OIR    2025250     91400   18.0200 -110.4200      15.0        50       130        60
OIR    2025250     91400   18.0200 -110.4300      15.2        51       131        60
OIR    2025250     91400   18.0200 -110.4400      15.3        51       132        60
OIR    2025250     91400   18.0200 -110.4500      15.5        51       133        60
OIR    2025250     91400   18.0200 -110.4600      15.6        52       133        60
OIR    2025250     91400   18.0200 -110.4700      15.8        52       132        60
OIR    2025250     91400   18.0200 -110.4800      15.8        52       131        60
OIR    2025250     91400   18.0200 -110.4900      15.9        52       130        60
OIR    2025250     91400   18.0200 -110.5000      16.0        53       128        60
OIR    2025250     91400   18.0200 -110.5100      16.0        53       126        60
OIR    2025250     91400   18.0200 -110.5200      16.1        53       124        60
OIR    2025250     91400   18.0200 -110.5300      16.2        53       122        60
OIR    2025250     91400   18.0200 -110.5400      16.2        53       122        60
OIR    2025250     91400   18.0200 -110.5500      16.2        54       123        60
OIR    2025250     91400   18.0200 -110.5600      16.2        54       122        60
OIR    2025250     91400   18.0200 -110.5700      16.3        54       121        60
OIR    2025250     91400   18.0200 -110.5800      16.3        54       122        60
OIR    2025250     91400   18.0200 -110.5900      16.3        54       127        60
OIR    2025250     91400   18.0200 -110.6000      16.3        54       132        60
OIR    2025250     91400   18.0200 -110.6100      16.2        54       135        60
OIR    2025250     91400   18.0200 -110.6200      16.2        54       137        60
OIR    2025250     91400   18.0200 -110.6300      16.2        54       139        60
OIR    2025250     91400   18.0200 -110.6400      16.2        54       141        60
OIR    2025250     91400   18.0200 -111.0600      19.2        60       142        60
OIR    2025250     91400   18.0200 -111.0700      19.4        61       136        60
OIR    2025250     91400   18.0200 -111.0800      19.4        61       133        60
OIR    2025250     91400   18.0200 -111.0900      19.1        61       133        60
OIR    2025250     91400   18.0200 -111.1000      18.5        60       133        60
OIR    2025250     91400   18.0200 -111.1100      17.6        59       135        60
OIR    2025250     91400   18.0200 -111.1200      17.3        58       136        60
OIR    2025250     91400   18.0200 -111.1300      17.1        58       137        60
OIR    2025250     91400   18.0200 -111.1400      17.1        58       138        60
OIR    2025250     91400   18.0200 -111.1500      17.0        58       139        60
OIR    2025250     91400   18.0200 -111.1600      17.0        57       143        60
OIR    2025250     91400   18.0200 -111.3600      15.1        62       142        60
OIR    2025250     91400   18.0200 -111.3700      15.0        62       137        60
OIR    2025250     91400   18.0200 -111.3800      14.9        62       131        60
OIR    2025250     91400   18.0200 -111.3900      14.9        63       128        60
OIR    2025250     91400   18.0200 -111.4000      14.9        63       126        60
OIR    2025250     91400   18.0200 -111.4100      14.8        63       125        60
OIR    2025250     91400   18.0200 -111.4200      14.8        64       128        60
OIR    2025250     91400   18.0200 -111.4300      14.7        64       130        60
OIR    2025250     91400   18.0200 -111.4400      14.6        64       130        60
OIR    2025250     91400   18.0200 -111.4500      14.2        65       130        60
OIR    2025250     91400   18.0200 -111.4600      13.9        66       131        60
OIR    2025250     91400   18.0200 -111.4700      13.6        66       132        60
OIR    2025250     91400   18.0200 -111.4800      13.4        67       132        60
OIR    2025250     91400   18.0200 -111.4900      13.2        68       131        60
OIR    2025250     91400   18.0200 -111.5000      12.8        68       129        60
OIR    2025250     91400   18.0200 -111.5100      12.4        68       125        60
OIR    2025250     91400   18.0200 -111.5200      12.1        68       121        60
OIR    2025250     91400   18.0200 -111.5300      11.9        67       119        60
OIR    2025250     91400   18.0200 -111.5400      11.7        67       119        60
OIR    2025250     91400   18.0200 -111.5500      11.6        67       117        60
OIR    2025250     91400   18.0200 -111.5600      11.5        67       116        60
OIR    2025250     91400   18.0200 -111.5700      11.4        67       113        60
OIR    2025250     91400   18.0200 -111.5800      11.3        67       112        60
OIR    2025250     91400   18.0200 -111.5900      11.2        67       110        60
OIR    2025250     91400   18.0200 -111.6000      11.2        67       111        60
OIR    2025250     91400   18.0200 -111.6100      11.1        67       112        60
OIR    2025250     91400   18.0200 -111.6200      11.0        67       113        60
OIR    2025250     91400   18.0200 -111.6300      11.0        67       113        60
OIR    2025250     91400   18.0200 -111.6400      10.9        67       114        60
OIR    2025250     91400   18.0200 -111.6500      10.9        67       115        60
OIR    2025250     91400   18.0200 -111.6600      10.9        67       116        60
OIR    2025250     91400   18.0200 -111.6700      10.8        67       117        60
OIR    2025250     91400   18.0200 -111.6800      10.8        67       119        60
OIR    2025250     91400   18.0200 -111.6900      10.8        67       119        60
OIR    2025250     91400   18.0200 -111.7000      10.8        67       116        60
OIR    2025250     91400   18.0200 -111.7100      10.8        67       114        60
OIR    2025250     91400   18.0200 -111.7200      10.8        67       114        60
OIR    2025250     91400   18.0200 -111.7300      10.8        67       114        60
OIR    2025250     91400   18.0200 -111.7400      10.8        67       116        60
OIR    2025250     91400   18.0200 -111.7500      10.8        66       120        60
OIR    2025250     91400   18.0200 -111.7600      10.8        66       120        60
OIR    2025250     91400   18.0200 -111.7700      10.8        66       116        60
OIR    2025250     91400   18.0200 -111.7800      10.8        65       113        60
OIR    2025250     91400   18.0200 -111.7900      11.1        65       111        60
OIR    2025250     91400   18.0200 -111.8000      11.2        64       109        60
OIR    2025250     91400   18.0200 -111.8100      11.3        64       110        60
OIR    2025250     91400   18.0200 -111.8200      11.4        63       111        60
OIR    2025250     91400   18.0200 -111.8300      11.4        62       114        60
OIR    2025250     91400   18.0200 -111.8400      11.5        62       117        60
OIR    2025250     91400   18.0200 -111.8500      11.5        61       123        60
OIR    2025250     91400   18.0200 -111.8600      11.6        61       127        60
OIR    2025250     91400   18.0200 -111.8700      11.7        60       132        60
OIR    2025250     91400   18.0200 -111.8800      11.6        59       134        60
OIR    2025250     91400   18.0200 -111.8900      11.2        55       136        60
OIR    2025250     91400   18.0200 -111.9000      10.8        53       135        60
OIR    2025250     91400   18.0200 -111.9100      10.8        53       133        60
OIR    2025250     91400   18.0200 -111.9200      10.8        53       131        60
OIR    2025250     91400   18.0200 -111.9300      10.8        53       127        60
OIR    2025250     91400   18.0200 -111.9400      10.9        53       124        60
OIR    2025250     91400   18.0200 -111.9500      10.9        54       123        60
OIR    2025250     91400   18.0200 -111.9600      10.9        55       123        60
OIR    2025250     91400   18.0200 -111.9700      10.8        58       123        60
OIR    2025250     91400   18.0200 -111.9800      10.7        63       123        60
OIR    2025250     91400   18.0200 -111.9900      10.5        72       123        60
OIR    2025250     91400   18.0200 -112.0000      10.6        75       122        60
OIR    2025250     91400   18.0200 -112.0100      10.7        77       120        60
OIR    2025250     91400   18.0200 -112.0200      10.8        78       116        60
OIR    2025250     91400   18.0200 -112.0300      11.0        80       112        60
OIR    2025250     91400   18.0200 -112.0400      11.0        81       108        60
OIR    2025250     91400   18.0200 -112.0500      11.0        82       105        60
OIR    2025250     91400   18.0200 -112.0600      11.0        82       103        60
OIR    2025250     91400   18.0200 -112.0700      10.9        82       103        60
OIR    2025250     91400   18.0200 -112.0800      10.8        81       103        60
OIR    2025250     91400   18.0200 -112.0900      10.7        80       103        60
OIR    2025250     91400   18.0200 -112.1000      10.6        79       103        60
OIR    2025250     91400   18.0200 -112.1100      10.6        79       103        60
OIR    2025250     91400   18.0200 -112.1200      10.6        79       103        60
OIR    2025250     91400   18.0200 -112.1300      10.6        79       103        60
OIR    2025250     91400   18.0200 -112.1400      10.5        80       104        60
OIR    2025250     91400   18.0200 -112.1500      10.4        80       104        60
OIR    2025250     91400   18.0200 -112.1600      10.3        81       104        60
OIR    2025250     91400   18.0200 -112.1700      10.2        82       105        60
OIR    2025250     91400   18.0200 -112.1800      10.1        83       108        60
OIR    2025250     91400   18.0200 -112.1900      10.1        83       110        60
OIR    2025250     91400   18.0200 -112.2000       9.9        83       112        60
OIR    2025250     91400   18.0200 -112.2100       9.9        83       109        60
OIR    2025250     91400   18.0200 -112.2200       9.9        83       105        60
OIR    2025250     91400   18.0200 -112.2300       9.9        84       104        60
OIR    2025250     91400   18.0200 -112.2400       9.9        84       104        60
OIR    2025250     91400   18.0200 -112.2500       9.9        84       103        60
OIR    2025250     91400   18.0200 -112.2600      10.1        85       103        60
OIR    2025250     91400   18.0200 -112.2700      10.2        85       104        60
OIR    2025250     91400   18.0200 -112.2800      10.2        86       104        60
OIR    2025250     91400   18.0200 -112.2900      10.4        86       104        60
OIR    2025250     91400   18.0200 -112.3000      10.5        87       105        60
OIR    2025250     91400   18.0200 -112.3100      10.7        90       108        60
OIR    2025250     91400   18.0200 -112.3200      10.8        93       110        60
OIR    2025250     91400   18.0200 -112.3300      10.9        95       111        60
OIR    2025250     91400   18.0200 -112.3400      11.0        97       112        60
OIR    2025250     91400   18.0200 -112.3500      11.0        98       112        60
OIR    2025250     91400   18.0200 -112.3600      10.9       100       112        60
OIR    2025250     91400   18.0200 -112.3700      10.6       102       113        60
OIR    2025250     91400   18.0200 -112.3800      10.5       103       113        60
OIR    2025250     91400   18.0200 -112.3900      10.4       105       113        60
OIR    2025250     91400   18.0200 -112.4000      10.5       108       111        60
OIR    2025250     91400   18.0200 -112.4100      10.4       110       109        60
OIR    2025250     91400   18.0200 -112.4200      10.1       112       108        60
OIR    2025250     91400   18.0200 -112.4300       9.6       116       107        60
OIR    2025250     91400   18.0200 -112.4400       9.2       121       105        60
OIR    2025250     91400   18.0200 -112.4500       9.1       124       104        60
OIR    2025250     91400   18.0200 -112.4600       9.2       126       104        60
OIR    2025250     91400   18.0200 -112.4700       9.2       126       104        60
OIR    2025250     91400   18.0200 -112.4800       9.1       125       104        60
OIR    2025250     91400   18.0200 -112.4900       8.9       125       104        60
OIR    2025250     91400   18.0200 -112.5000       8.6       124       104        60
OIR    2025250     91400   18.0200 -112.5100       8.3       124       104        60
OIR    2025250     91400   18.0200 -112.5200       7.9       123       105        60
OIR    2025250     91400   18.0200 -112.5300       7.5       122       105        60
OIR    2025250     91400   18.0200 -112.5400       7.2       123       107        60
OIR    2025250     91400   18.0200 -112.5500       6.9       124       108        60
OIR    2025250     91400   18.0200 -112.5600       6.5       125       109        60
OIR    2025250     91400   18.0200 -112.5700       5.7       129       110        60
OIR    2025250     91400   18.0200 -112.5800       4.9       133       112        60
OIR    2025250     91400   18.0200 -112.5900       4.5       136       113        60
OIR    2025250     91400   18.0200 -112.6000       4.3       139       113        60
OIR    2025250     91400   18.0200 -112.6100       4.2       142       114        60
OIR    2025250     91400   18.0200 -112.6200       4.1       144       114        60
OIR    2025250     91400   18.0200 -112.6300       4.1       145       115        60
OIR    2025250     91400   18.0200 -112.6400       4.1       147       115        60
OIR    2025250     91400   18.0200 -112.6500       4.0       148       119        60
OIR    2025250     91400   18.0200 -112.6800       4.1       146       124        60
OIR    2025250     91400   18.0200 -112.6900       4.1       145       123        60
OIR    2025250     91400   18.0200 -112.7000       4.2       145       123        60
OIR    2025250     91400   18.0200 -112.7100       4.3       146       122        60
OIR    2025250     91400   18.0200 -112.7200       4.5       146       121        60
OIR    2025250     91400   18.0200 -112.7300       4.6       147       120        60
OIR    2025250     91400   18.0200 -112.7400       4.6       147       121        60
OIR    2025250     91400   18.0200 -112.7500       4.6       147       123        60
OIR    2025250     91400   18.0200 -112.7600       4.5       147       126        60
OIR    2025250     91400   18.0200 -112.7700       4.3       146       130        60
OIR    2025250     91400   18.0200 -112.7800       4.2       145       133        60
OIR    2025250     91400   18.0200 -112.7900       4.2       145       132        60
OIR    2025250     91400   18.0200 -112.8000       4.2       145       132        60
OIR    2025250     91400   18.0200 -112.8100       4.1       145       130        60
OIR    2025250     91400   18.0200 -112.8200       4.1       146       129        60
OIR    2025250     91400   18.0200 -112.8300       4.1       147       127        60
OIR    2025250     91400   18.0200 -112.8400       4.1       148       126        60
OIR    2025250     91400   18.0200 -112.8500       4.1       148       126        60
OIR    2025250     91400   18.0200 -112.8600       4.1       148       129        60
OIR    2025250     91400   18.0200 -112.8700       4.1       148       132        60
OIR    2025250     91400   18.0200 -113.4800       4.8        48       143        60
OIR    2025250     91400   18.0200 -113.4900       4.4        39       137        60
OIR    2025250     91400   18.0200 -113.5000       4.2        35       137        60
OIR    2025250     91400   18.0200 -113.5100       4.1        34       138        60
OIR    2025250     91400   18.0200 -114.4100       4.5       293       144        60
OIR    2025250     91400   18.0200 -114.4200       4.5       293       140        60
OIR    2025250     91400   18.0100 -110.3500      13.6        43       142        60
OIR    2025250     91400   18.0100 -110.3600      13.6        45       140        60
OIR    2025250     91400   18.0100 -110.3700      13.7        47       138        60
OIR    2025250     91400   18.0100 -110.3800      13.9        48       137        60
OIR    2025250     91400   18.0100 -110.3900      14.1        48       135        60
OIR    2025250     91400   18.0100 -110.4000      14.3        49       131        60
OIR    2025250     91400   18.0100 -110.4100      14.7        50       127        60
OIR    2025250     91400   18.0100 -110.4200      14.9        50       128        60
OIR    2025250     91400   18.0100 -110.4300      15.1        51       130        60
OIR    2025250     91400   18.0100 -110.4400      15.3        51       132        60
OIR    2025250     91400   18.0100 -110.4500      15.5        51       132        60
OIR    2025250     91400   18.0100 -110.4600      15.6        52       133        60
OIR    2025250     91400   18.0100 -110.4700      15.8        52       132        60
OIR    2025250     91400   18.0100 -110.4800      15.8        52       130        60
OIR    2025250     91400   18.0100 -110.4900      15.9        53       129        60
OIR    2025250     91400   18.0100 -110.5000      16.0        53       127        60
OIR    2025250     91400   18.0100 -110.5100      16.0        53       126        60
OIR    2025250     91400   18.0100 -110.5200      16.1        53       125        60
OIR    2025250     91400   18.0100 -110.5300      16.1        53       124        60
OIR    2025250     91400   18.0100 -110.5400      16.2        54       123        60
OIR    2025250     91400   18.0100 -110.5500      16.2        54       121        60
OIR    2025250     91400   18.0100 -110.5600      16.2        54       121        60
OIR    2025250     91400   18.0100 -110.5700      16.2        54       121        60
OIR    2025250     91400   18.0100 -110.5800      16.2        54       121        60
OIR    2025250     91400   18.0100 -110.5900      16.2        54       126        60
OIR    2025250     91400   18.0100 -110.6000      16.2        54       130        60
OIR    2025250     91400   18.0100 -110.6100      16.2        54       133        60
OIR    2025250     91400   18.0100 -110.6200      16.2        54       134        60
OIR    2025250     91400   18.0100 -110.6300      16.2        54       136        60
OIR    2025250     91400   18.0100 -110.6400      16.2        54       137        60
OIR    2025250     91400   18.0100 -110.6500      16.2        54       138        60
OIR    2025250     91400   18.0100 -110.6600      16.2        54       142        60
OIR    2025250     91400   18.0100 -111.0700      19.6        62       140        60
OIR    2025250     91400   18.0100 -111.0800      19.6        62       136        60
OIR    2025250     91400   18.0100 -111.0900      19.4        62       135        60
OIR    2025250     91400   18.0100 -111.1000      19.0        61       134        60
OIR    2025250     91400   18.0100 -111.1100      17.8        59       136        60
OIR    2025250     91400   18.0100 -111.1200      17.4        59       138        60
OIR    2025250     91400   18.0100 -111.1300      17.2        58       139        60
OIR    2025250     91400   18.0100 -111.1400      17.0        58       139        60
OIR    2025250     91400   18.0100 -111.1500      17.0        58       140        60
OIR    2025250     91400   18.0100 -111.1600      16.9        58       142        60
OIR    2025250     91400   18.0100 -111.3600      15.1        62       141        60
OIR    2025250     91400   18.0100 -111.3700      15.0        62       134        60
OIR    2025250     91400   18.0100 -111.3800      15.0        62       127        60
OIR    2025250     91400   18.0100 -111.3900      15.0        63       126        60
OIR    2025250     91400   18.0100 -111.4000      15.0        63       126        60
OIR    2025250     91400   18.0100 -111.4100      14.9        64       126        60
OIR    2025250     91400   18.0100 -111.4200      14.8        64       128        60
OIR    2025250     91400   18.0100 -111.4300      14.8        64       130        60
OIR    2025250     91400   18.0100 -111.4400      14.7        65       130        60
OIR    2025250     91400   18.0100 -111.4500      14.4        65       131        60
OIR    2025250     91400   18.0100 -111.4600      14.1        66       132        60
OIR    2025250     91400   18.0100 -111.4700      13.9        67       133        60
OIR    2025250     91400   18.0100 -111.4800      13.7        68       133        60
OIR    2025250     91400   18.0100 -111.4900      13.7        69       132        60
OIR    2025250     91400   18.0100 -111.5000      13.5        70       130        60
OIR    2025250     91400   18.0100 -111.5100      13.1        70       126        60
OIR    2025250     91400   18.0100 -111.5200      12.7        69       120        60
OIR    2025250     91400   18.0100 -111.5300      12.3        69       117        60
OIR    2025250     91400   18.0100 -111.5400      12.0        68       117        60
OIR    2025250     91400   18.0100 -111.5500      11.7        68       117        60
OIR    2025250     91400   18.0100 -111.5600      11.6        67       116        60
OIR    2025250     91400   18.0100 -111.5700      11.5        67       115        60
OIR    2025250     91400   18.0100 -111.5800      11.4        67       113        60
OIR    2025250     91400   18.0100 -111.5900      11.3        67       111        60
OIR    2025250     91400   18.0100 -111.6000      11.2        67       111        60
OIR    2025250     91400   18.0100 -111.6100      11.1        67       112        60
OIR    2025250     91400   18.0100 -111.6200      11.1        67       113        60
OIR    2025250     91400   18.0100 -111.6300      11.0        67       113        60
OIR    2025250     91400   18.0100 -111.6400      11.0        67       114        60
OIR    2025250     91400   18.0100 -111.6500      10.9        67       116        60
OIR    2025250     91400   18.0100 -111.6600      10.9        67       117        60
OIR    2025250     91400   18.0100 -111.6700      10.9        67       119        60
OIR    2025250     91400   18.0100 -111.6800      10.8        67       120        60
OIR    2025250     91400   18.0100 -111.6900      10.8        67       121        60
OIR    2025250     91400   18.0100 -111.7000      10.8        67       119        60
OIR    2025250     91400   18.0100 -111.7100      10.8        67       116        60
OIR    2025250     91400   18.0100 -111.7200      10.8        67       116        60
OIR    2025250     91400   18.0100 -111.7300      10.8        67       116        60
OIR    2025250     91400   18.0100 -111.7400      10.8        67       117        60
OIR    2025250     91400   18.0100 -111.7500      10.7        66       120        60
OIR    2025250     91400   18.0100 -111.7600      10.7        66       121        60
OIR    2025250     91400   18.0100 -111.7700      10.8        66       117        60
OIR    2025250     91400   18.0100 -111.7800      10.8        65       114        60
OIR    2025250     91400   18.0100 -111.7900      11.0        65       111        60
OIR    2025250     91400   18.0100 -111.8000      11.1        65       109        60
OIR    2025250     91400   18.0100 -111.8100      11.3        64       109        60
OIR    2025250     91400   18.0100 -111.8200      11.4        63       111        60
OIR    2025250     91400   18.0100 -111.8300      11.4        62       115        60
OIR    2025250     91400   18.0100 -111.8400      11.5        62       120        60
OIR    2025250     91400   18.0100 -111.8500      11.6        61       126        60
OIR    2025250     91400   18.0100 -111.8600      11.7        61       129        60
OIR    2025250     91400   18.0100 -111.8700      11.8        60       129        60
OIR    2025250     91400   18.0100 -111.8800      11.8        59       131        60
OIR    2025250     91400   18.0100 -111.8900      11.7        57       134        60
OIR    2025250     91400   18.0100 -111.9000      11.0        54       135        60
OIR    2025250     91400   18.0100 -111.9100      10.9        53       132        60
OIR    2025250     91400   18.0100 -111.9200      10.9        53       129        60
OIR    2025250     91400   18.0100 -111.9300      11.0        53       126        60
OIR    2025250     91400   18.0100 -111.9400      11.2        53       124        60
OIR    2025250     91400   18.0100 -111.9500      11.3        54       122        60
OIR    2025250     91400   18.0100 -111.9600      11.5        56       122        60
OIR    2025250     91400   18.0100 -111.9700      11.4        58       121        60
OIR    2025250     91400   18.0100 -111.9800      11.3        63       120        60
OIR    2025250     91400   18.0100 -111.9900      11.0        71       117        60
OIR    2025250     91400   18.0100 -112.0000      10.8        74       116        60
OIR    2025250     91400   18.0100 -112.0100      10.9        76       116        60
OIR    2025250     91400   18.0100 -112.0200      11.0        77       114        60
OIR    2025250     91400   18.0100 -112.0300      11.1        79       110        60
OIR    2025250     91400   18.0100 -112.0400      11.1        80       104        60
OIR    2025250     91400   18.0100 -112.0500      11.1        80       104        60
OIR    2025250     91400   18.0100 -112.0600      11.1        80       103        60
OIR    2025250     91400   18.0100 -112.0700      11.0        80       103        60
OIR    2025250     91400   18.0100 -112.0800      10.9        79       103        60
OIR    2025250     91400   18.0100 -112.0900      10.8        78       103        60
OIR    2025250     91400   18.0100 -112.1000      10.8        78       103        60
OIR    2025250     91400   18.0100 -112.1100      10.7        78       103        60
OIR    2025250     91400   18.0100 -112.1200      10.7        78       103        60
OIR    2025250     91400   18.0100 -112.1300      10.7        78       103        60
OIR    2025250     91400   18.0100 -112.1400      10.7        78       103        60
OIR    2025250     91400   18.0100 -112.1500      10.7        79       103        60
OIR    2025250     91400   18.0100 -112.1600      10.5        79       104        60
OIR    2025250     91400   18.0100 -112.1700      10.5        80       104        60
OIR    2025250     91400   18.0100 -112.1800      10.4        81       107        60
OIR    2025250     91400   18.0100 -112.1900      10.2        82       108        60
OIR    2025250     91400   18.0100 -112.2000       9.9        83       109        60
OIR    2025250     91400   18.0100 -112.2100       9.8        83       109        60
OIR    2025250     91400   18.0100 -112.2200       9.8        83       105        60
OIR    2025250     91400   18.0100 -112.2300       9.9        83       104        60
OIR    2025250     91400   18.0100 -112.2400       9.9        84       104        60
OIR    2025250     91400   18.0100 -112.2500      10.0        84       103        60
OIR    2025250     91400   18.0100 -112.2600      10.1        85       103        60
OIR    2025250     91400   18.0100 -112.2700      10.2        85       104        60
OIR    2025250     91400   18.0100 -112.2800      10.3        86       104        60
OIR    2025250     91400   18.0100 -112.2900      10.4        86       103        60
OIR    2025250     91400   18.0100 -112.3000      10.5        86       104        60
OIR    2025250     91400   18.0100 -112.3100      10.7        87       107        60
OIR    2025250     91400   18.0100 -112.3200      10.8        89       109        60
OIR    2025250     91400   18.0100 -112.3300      10.9        91       110        60
OIR    2025250     91400   18.0100 -112.3400      10.9        93       111        60
OIR    2025250     91400   18.0100 -112.3500      10.7        94       112        60
OIR    2025250     91400   18.0100 -112.3600      10.2        96       112        60
OIR    2025250     91400   18.0100 -112.3700       9.9        97       112        60
OIR    2025250     91400   18.0100 -112.3800       9.7        99       111        60
OIR    2025250     91400   18.0100 -112.3900       9.7       102       110        60
OIR    2025250     91400   18.0100 -112.4000       9.6       104       108        60
OIR    2025250     91400   18.0100 -112.4100       9.6       107       105        60
OIR    2025250     91400   18.0100 -112.4200       9.5       111       105        60
OIR    2025250     91400   18.0100 -112.4300       9.1       115       104        60
OIR    2025250     91400   18.0100 -112.4400       8.8       119       104        60
OIR    2025250     91400   18.0100 -112.4500       8.7       122       104        60
OIR    2025250     91400   18.0100 -112.4600       8.6       123       104        60
OIR    2025250     91400   18.0100 -112.4700       8.6       123       104        60
OIR    2025250     91400   18.0100 -112.4800       8.6       123       105        60
OIR    2025250     91400   18.0100 -112.4900       8.5       123       104        60
OIR    2025250     91400   18.0100 -112.5000       8.3       122       104        60
OIR    2025250     91400   18.0100 -112.5100       7.9       121       104        60
OIR    2025250     91400   18.0100 -112.5200       7.6       120       104        60
OIR    2025250     91400   18.0100 -112.5300       7.3       120       105        60
OIR    2025250     91400   18.0100 -112.5400       7.1       120       107        60
OIR    2025250     91400   18.0100 -112.5500       6.8       122       108        60
OIR    2025250     91400   18.0100 -112.5600       6.3       125       109        60
OIR    2025250     91400   18.0100 -112.5700       5.5       129       109        60
OIR    2025250     91400   18.0100 -112.5800       4.8       133       110        60
OIR    2025250     91400   18.0100 -112.5900       4.4       135       110        60
OIR    2025250     91400   18.0100 -112.6000       4.2       138       111        60
OIR    2025250     91400   18.0100 -112.6100       4.0       141       112        60
OIR    2025250     91400   18.0100 -112.7200       4.2       145       122        60
OIR    2025250     91400   18.0100 -112.7300       4.4       146       121        60
OIR    2025250     91400   18.0100 -112.7400       4.5       146       122        60
OIR    2025250     91400   18.0100 -112.7500       4.5       147       122        60
OIR    2025250     91400   18.0100 -112.7600       4.2       147       124        60
OIR    2025250     91400   18.0100 -112.7700       4.1       144       128        60
OIR    2025250     91400   18.0100 -112.7800       4.1       143       133        60
OIR    2025250     91400   18.0100 -112.7900       4.1       143       133        60
OIR    2025250     91400   18.0100 -112.8000       4.0       143       132        60
OIR    2025250     91400   18.0100 -112.8100       4.0       144       130        60
OIR    2025250     91400   18.0100 -112.8200       4.0       145       128        60
OIR    2025250     91400   18.0100 -112.8300       4.0       146       127        60
OIR    2025250     91400   18.0100 -112.8400       4.0       147       126        60
OIR    2025250     91400   18.0100 -112.8500       4.1       148       125        60
OIR    2025250     91400   18.0100 -112.8600       4.0       148       128        60
OIR    2025250     91400   18.0100 -113.4700       4.5        54       143        60
OIR    2025250     91400   18.0100 -113.4800       4.5        40       137        60
OIR    2025250     91400   18.0100 -113.4900       4.4        35       132        60
OIR    2025250     91400   18.0100 -113.5000       4.2        32       132        60
OIR    2025250     91400   18.0100 -113.5100       4.0        28       132        60
OIR    2025250     91400   18.0000 -110.3600      13.5        46       142        60
OIR    2025250     91400   18.0000 -110.3700      13.6        47       140        60
OIR    2025250     91400   18.0000 -110.3800      13.8        48       138        60
OIR    2025250     91400   18.0000 -110.3900      14.0        48       136        60
OIR    2025250     91400   18.0000 -110.4000      14.2        49       134        60
OIR    2025250     91400   18.0000 -110.4100      14.5        50       133        60
OIR    2025250     91400   18.0000 -110.4200      14.8        51       133        60
OIR    2025250     91400   18.0000 -110.4300      15.1        51       133        60
OIR    2025250     91400   18.0000 -110.4400      15.3        51       134        60
OIR    2025250     91400   18.0000 -110.4500      15.4        52       133        60
OIR    2025250     91400   18.0000 -110.4600      15.6        52       132        60
OIR    2025250     91400   18.0000 -110.4700      15.8        52       132        60
OIR    2025250     91400   18.0000 -110.4800      15.8        53       131        60
OIR    2025250     91400   18.0000 -110.4900      15.9        53       129        60
OIR    2025250     91400   18.0000 -110.5000      16.0        53       127        60
OIR    2025250     91400   18.0000 -110.5100      16.1        53       125        60
OIR    2025250     91400   18.0000 -110.5200      16.1        53       124        60
OIR    2025250     91400   18.0000 -110.5300      16.1        54       123        60
OIR    2025250     91400   18.0000 -110.5400      16.2        54       123        60
OIR    2025250     91400   18.0000 -110.5500      16.2        54       123        60
OIR    2025250     91400   18.0000 -110.5600      16.2        54       123        60
OIR    2025250     91400   18.0000 -110.5700      16.2        54       123        60
OIR    2025250     91400   18.0000 -110.5800      16.2        54       123        60
OIR    2025250     91400   18.0000 -110.5900      16.2        54       125        60
OIR    2025250     91400   18.0000 -110.6000      16.2        54       127        60
OIR    2025250     91400   18.0000 -110.6100      16.2        54       129        60
OIR    2025250     91400   18.0000 -110.6200      16.2        54       131        60
OIR    2025250     91400   18.0000 -110.6300      16.2        54       134        60
OIR    2025250     91400   18.0000 -110.6400      16.2        54       134        60
OIR    2025250     91400   18.0000 -110.6500      16.2        54       134        60
OIR    2025250     91400   18.0000 -110.6600      16.2        54       138        60
OIR    2025250     91400   18.0000 -111.0700      19.7        62       141        60
OIR    2025250     91400   18.0000 -111.0800      19.7        62       137        60
OIR    2025250     91400   18.0000 -111.0900      19.6        62       134        60
OIR    2025250     91400   18.0000 -111.1000      19.2        62       131        60
OIR    2025250     91400   18.0000 -111.1100      18.0        60       133        60
OIR    2025250     91400   18.0000 -111.1200      17.5        59       136        60
OIR    2025250     91400   18.0000 -111.1300      17.2        59       138        60
OIR    2025250     91400   18.0000 -111.1400      17.1        58       138        60
OIR    2025250     91400   18.0000 -111.1500      17.0        58       138        60
OIR    2025250     91400   18.0000 -111.1600      16.9        58       143        60
OIR    2025250     91400   18.0000 -111.3600      15.1        61       143        60
OIR    2025250     91400   18.0000 -111.3700      15.1        62       135        60
OIR    2025250     91400   18.0000 -111.3800      15.1        62       126        60
OIR    2025250     91400   18.0000 -111.3900      15.2        62       124        60
OIR    2025250     91400   18.0000 -111.4000      15.2        63       126        60
OIR    2025250     91400   18.0000 -111.4100      15.2        64       127        60
OIR    2025250     91400   18.0000 -111.4200      15.0        64       129        60
OIR    2025250     91400   18.0000 -111.4300      14.9        65       130        60
OIR    2025250     91400   18.0000 -111.4400      14.8        65       131        60
OIR    2025250     91400   18.0000 -111.4500      14.6        66       132        60
OIR    2025250     91400   18.0000 -111.4600      14.3        67       132        60
OIR    2025250     91400   18.0000 -111.4700      14.1        68       133        60
OIR    2025250     91400   18.0000 -111.4800      14.0        69       135        60
OIR    2025250     91400   18.0000 -111.4900      13.9        70       133        60
OIR    2025250     91400   18.0000 -111.5000      13.9        71       131        60
OIR    2025250     91400   18.0000 -111.5100      13.8        71       126        60
OIR    2025250     91400   18.0000 -111.5200      13.4        71       120        60
OIR    2025250     91400   18.0000 -111.5300      13.1        71       116        60
OIR    2025250     91400   18.0000 -111.5400      12.7        70       116        60
OIR    2025250     91400   18.0000 -111.5500      12.1        69       116        60
OIR    2025250     91400   18.0000 -111.5600      11.8        68       116        60
OIR    2025250     91400   18.0000 -111.5700      11.7        68       116        60
OIR    2025250     91400   18.0000 -111.5800      11.5        67       115        60
OIR    2025250     91400   18.0000 -111.5900      11.4        67       114        60
OIR    2025250     91400   18.0000 -111.6000      11.3        67       113        60
OIR    2025250     91400   18.0000 -111.6100      11.2        67       112        60
OIR    2025250     91400   18.0000 -111.6200      11.1        67       111        60
OIR    2025250     91400   18.0000 -111.6300      11.1        67       113        60
OIR    2025250     91400   18.0000 -111.6400      11.0        67       116        60
OIR    2025250     91400   18.0000 -111.6500      11.0        67       119        60
OIR    2025250     91400   18.0000 -111.6600      11.0        67       122        60
OIR    2025250     91400   18.0000 -111.6700      11.0        67       123        60
OIR    2025250     91400   18.0000 -111.6800      10.9        67       123        60
OIR    2025250     91400   18.0000 -111.6900      10.9        67       123        60
OIR    2025250     91400   18.0000 -111.7000      10.9        67       122        60
OIR    2025250     91400   18.0000 -111.7100      10.9        67       121        60
OIR    2025250     91400   18.0000 -111.7200      10.8        67       121        60
OIR    2025250     91400   18.0000 -111.7300      10.8        67       121        60
OIR    2025250     91400   18.0000 -111.7400      10.8        66       121        60
OIR    2025250     91400   18.0000 -111.7500      10.7        66       122        60
OIR    2025250     91400   18.0000 -111.7600      10.7        66       123        60
OIR    2025250     91400   18.0000 -111.7700      10.8        66       120        60
OIR    2025250     91400   18.0000 -111.7800      10.8        66       116        60
OIR    2025250     91400   18.0000 -111.7900      10.9        65       114        60
OIR    2025250     91400   18.0000 -111.8000      11.0        65       112        60
OIR    2025250     91400   18.0000 -111.8100      11.2        64       111        60
OIR    2025250     91400   18.0000 -111.8200      11.4        63       114        60
OIR    2025250     91400   18.0000 -111.8300      11.5        63       116        60
OIR    2025250     91400   18.0000 -111.8400      11.6        62       121        60
OIR    2025250     91400   18.0000 -111.8500      11.7        62       126        60
OIR    2025250     91400   18.0000 -111.8600      11.8        61       129        60
OIR    2025250     91400   18.0000 -111.8700      11.9        60       129        60
OIR    2025250     91400   18.0000 -111.8800      12.0        59       129        60
OIR    2025250     91400   18.0000 -111.8900      12.0        58       131        60
OIR    2025250     91400   18.0000 -111.9000      11.5        55       133        60
OIR    2025250     91400   18.0000 -111.9100      11.3        54       131        60
OIR    2025250     91400   18.0000 -111.9200      11.2        54       128        60
OIR    2025250     91400   18.0000 -111.9300      11.3        54       125        60
OIR    2025250     91400   18.0000 -111.9400      11.6        54       124        60
OIR    2025250     91400   18.0000 -111.9500      11.9        56       122        60
OIR    2025250     91400   18.0000 -111.9600      12.0        57       121        60
OIR    2025250     91400   18.0000 -111.9700      12.1        59       120        60
OIR    2025250     91400   18.0000 -111.9800      11.9        62       117        60
OIR    2025250     91400   18.0000 -111.9900      11.6        67       115        60
OIR    2025250     91400   18.0000 -112.0000      11.1        71       113        60
OIR    2025250     91400   18.0000 -112.0100      11.1        74       112        60
OIR    2025250     91400   18.0000 -112.0200      11.2        76       111        60
OIR    2025250     91400   18.0000 -112.0300      11.2        77       108        60
OIR    2025250     91400   18.0000 -112.0400      11.2        78       104        60
OIR    2025250     91400   18.0000 -112.0500      11.2        79       103        60
OIR    2025250     91400   18.0000 -112.0600      11.0        78       103        60
OIR    2025250     91400   18.0000 -112.0700      10.9        78       103        60
OIR    2025250     91400   18.0000 -112.0800      10.9        78       103        60
OIR    2025250     91400   18.0000 -112.0900      10.8        78       103        60
OIR    2025250     91400   18.0000 -112.1000      10.8        78       103        60
OIR    2025250     91400   18.0000 -112.1100      10.8        78       103        60
OIR    2025250     91400   18.0000 -112.1200      10.8        78       103        60
OIR    2025250     91400   18.0000 -112.1300      10.8        78       103        60
OIR    2025250     91400   18.0000 -112.1400      10.8        78       103        60
OIR    2025250     91400   18.0000 -112.1500      10.7        78       103        60
OIR    2025250     91400   18.0000 -112.1600      10.7        78       103        60
OIR    2025250     91400   18.0000 -112.1700      10.6        78       104        60
OIR    2025250     91400   18.0000 -112.1800      10.6        79       104        60
OIR    2025250     91400   18.0000 -112.1900      10.5        80       105        60
OIR    2025250     91400   18.0000 -112.2000       9.9        81       107        60
OIR    2025250     91400   18.0000 -112.2100       9.8        82       108        60
OIR    2025250     91400   18.0000 -112.2200       9.8        82       107        60
OIR    2025250     91400   18.0000 -112.2300       9.8        82       104        60
OIR    2025250     91400   18.0000 -112.2400       9.9        83       104        60
OIR    2025250     91400   18.0000 -112.2500      10.0        83       103        60
OIR    2025250     91400   18.0000 -112.2600      10.1        84       103        60
OIR    2025250     91400   18.0000 -112.2700      10.2        85       103        60
OIR    2025250     91400   18.0000 -112.2800      10.3        85       103        60
OIR    2025250     91400   18.0000 -112.2900      10.4        86       104        60
OIR    2025250     91400   18.0000 -112.3000      10.6        86       104        60
OIR    2025250     91400   18.0000 -112.3100      10.7        85       105        60
OIR    2025250     91400   18.0000 -112.3200      11.0        85       108        60
OIR    2025250     91400   18.0000 -112.3300      11.2        85       109        60
OIR    2025250     91400   18.0000 -112.3400      11.1        85       110        60
OIR    2025250     91400   18.0000 -112.3500      10.8        88       112        60
OIR    2025250     91400   18.0000 -112.3600       9.9        94       113        60
OIR    2025250     91400   18.0000 -112.3700       9.6        96       113        60
OIR    2025250     91400   18.0000 -112.3800       9.4        98       110        60
OIR    2025250     91400   18.0000 -112.3900       9.4        99       108        60
OIR    2025250     91400   18.0000 -112.4000       9.2       101       107        60
OIR    2025250     91400   18.0000 -112.4100       9.2       104       104        60
OIR    2025250     91400   18.0000 -112.4200       9.0       108       104        60
OIR    2025250     91400   18.0000 -112.4300       8.4       113       104        60
OIR    2025250     91400   18.0000 -112.4400       8.1       117       104        60
OIR    2025250     91400   18.0000 -112.4500       8.1       120       104        60
OIR    2025250     91400   18.0000 -112.4600       8.1       121       104        60
OIR    2025250     91400   18.0000 -112.4700       8.1       122       104        60
OIR    2025250     91400   18.0000 -112.4800       8.2       122       104        60
OIR    2025250     91400   18.0000 -112.4900       8.1       121       104        60
OIR    2025250     91400   18.0000 -112.5000       7.8       120       103        60
OIR    2025250     91400   18.0000 -112.5100       7.5       119       103        60
OIR    2025250     91400   18.0000 -112.5200       7.2       118       104        60
OIR    2025250     91400   18.0000 -112.5300       7.1       117       105        60
OIR    2025250     91400   18.0000 -112.5400       6.9       118       108        60
OIR    2025250     91400   18.0000 -112.5500       6.6       119       110        60
OIR    2025250     91400   18.0000 -112.5600       6.2       121       110        60
OIR    2025250     91400   18.0000 -112.5700       5.3       126       109        60
OIR    2025250     91400   18.0000 -112.5800       4.6       131       109        60
OIR    2025250     91400   18.0000 -112.5900       4.2       133       110        60
OIR    2025250     91400   18.0000 -113.4700       4.1        47       139        60
OIR    2025250     91400   18.0000 -113.4800       4.4        37       134        60
OIR    2025250     91400   18.0000 -113.4900       4.4        34       129        60
OIR    2025250     91400   18.0000 -113.5000       4.2        29       127        60
OIR    2025250     91400   18.0000 -113.5100       4.0        26       127        60
OIR    2025250     91400   17.9900 -110.3700      13.4        47       141        60
OIR    2025250     91400   17.9900 -110.3800      13.6        48       139        60
OIR    2025250     91400   17.9900 -110.3900      13.8        49       137        60
OIR    2025250     91400   17.9900 -110.4000      14.0        49       136        60
OIR    2025250     91400   17.9900 -110.4100      14.4        50       136        60
OIR    2025250     91400   17.9900 -110.4200      14.7        50       136        60
OIR    2025250     91400   17.9900 -110.4300      15.0        51       136        60
OIR    2025250     91400   17.9900 -110.4400      15.2        51       136        60
OIR    2025250     91400   17.9900 -110.4500      15.4        52       134        60
OIR    2025250     91400   17.9900 -110.4600      15.6        52       132        60
OIR    2025250     91400   17.9900 -110.4700      15.8        53       131        60
OIR    2025250     91400   17.9900 -110.4800      15.9        53       131        60
OIR    2025250     91400   17.9900 -110.4900      15.9        53       130        60
OIR    2025250     91400   17.9900 -110.5000      16.0        53       128        60
OIR    2025250     91400   17.9900 -110.5100      16.1        53       125        60
OIR    2025250     91400   17.9900 -110.5200      16.1        54       122        60
OIR    2025250     91400   17.9900 -110.5300      16.1        54       121        60
OIR    2025250     91400   17.9900 -110.5400      16.2        54       122        60
OIR    2025250     91400   17.9900 -110.5500      16.2        54       125        60
OIR    2025250     91400   17.9900 -110.5600      16.2        54       127        60
OIR    2025250     91400   17.9900 -110.5700      16.2        54       127        60
OIR    2025250     91400   17.9900 -110.5800      16.2        54       127        60
OIR    2025250     91400   17.9900 -110.5900      16.2        54       126        60
OIR    2025250     91400   17.9900 -110.6000      16.2        54       124        60
OIR    2025250     91400   17.9900 -110.6100      16.2        54       124        60
OIR    2025250     91400   17.9900 -110.6200      16.2        54       128        60
OIR    2025250     91400   17.9900 -110.6300      16.2        54       131        60
OIR    2025250     91400   17.9900 -110.6400      16.2        54       131        60
OIR    2025250     91400   17.9900 -110.6500      16.2        54       131        60
OIR    2025250     91400   17.9900 -110.6600      16.2        54       134        60
OIR    2025250     91400   17.9900 -110.6700      16.2        55       139        60
OIR    2025250     91400   17.9900 -111.0700      19.7        62       143        60
OIR    2025250     91400   17.9900 -111.0800      19.7        62       138        60
OIR    2025250     91400   17.9900 -111.0900      19.6        62       133        60
OIR    2025250     91400   17.9900 -111.1000      19.1        62       129        60
OIR    2025250     91400   17.9900 -111.1100      17.9        60       131        60
OIR    2025250     91400   17.9900 -111.1200      17.5        60       134        60
OIR    2025250     91400   17.9900 -111.1300      17.2        59       137        60
OIR    2025250     91400   17.9900 -111.1400      17.0        58       137        60
OIR    2025250     91400   17.9900 -111.1500      16.9        58       137        60
OIR    2025250     91400   17.9900 -111.1600      16.8        58       143        60
OIR    2025250     91400   17.9900 -111.3700      15.2        61       143        60
OIR    2025250     91400   17.9900 -111.3800      15.3        62       136        60
OIR    2025250     91400   17.9900 -111.3900      15.4        62       132        60
OIR    2025250     91400   17.9900 -111.4000      15.4        63       132        60
OIR    2025250     91400   17.9900 -111.4100      15.4        64       132        60
OIR    2025250     91400   17.9900 -111.4200      15.2        65       133        60
OIR    2025250     91400   17.9900 -111.4300      15.0        65       135        60
OIR    2025250     91400   17.9900 -111.4400      14.9        65       135        60
OIR    2025250     91400   17.9900 -111.4500      14.7        66       135        60
OIR    2025250     91400   17.9900 -111.4600      14.5        67       134        60
OIR    2025250     91400   17.9900 -111.4700      14.2        69       133        60
OIR    2025250     91400   17.9900 -111.4800      14.1        70       133        60
OIR    2025250     91400   17.9900 -111.4900      14.1        71       132        60
OIR    2025250     91400   17.9900 -111.5000      14.1        71       130        60
OIR    2025250     91400   17.9900 -111.5100      14.0        71       126        60
OIR    2025250     91400   17.9900 -111.5200      13.8        72       120        60
OIR    2025250     91400   17.9900 -111.5300      13.6        72       116        60
OIR    2025250     91400   17.9900 -111.5400      13.3        71       116        60
OIR    2025250     91400   17.9900 -111.5500      12.9        70       116        60
OIR    2025250     91400   17.9900 -111.5600      12.5        69       116        60
OIR    2025250     91400   17.9900 -111.5700      12.3        68       116        60
OIR    2025250     91400   17.9900 -111.5800      12.0        68       116        60
OIR    2025250     91400   17.9900 -111.5900      11.8        67       115        60
OIR    2025250     91400   17.9900 -111.6000      11.6        67       114        60
OIR    2025250     91400   17.9900 -111.6100      11.4        67       112        60
OIR    2025250     91400   17.9900 -111.6200      11.2        67       111        60
OIR    2025250     91400   17.9900 -111.6300      11.2        66       112        60
OIR    2025250     91400   17.9900 -111.6400      11.1        67       115        60
OIR    2025250     91400   17.9900 -111.6500      11.1        67       117        60
OIR    2025250     91400   17.9900 -111.6600      11.0        67       122        60
OIR    2025250     91400   17.9900 -111.6700      11.0        67       126        60
OIR    2025250     91400   17.9900 -111.6800      11.0        67       125        60
OIR    2025250     91400   17.9900 -111.6900      11.0        67       124        60
OIR    2025250     91400   17.9900 -111.7000      11.0        67       124        60
OIR    2025250     91400   17.9900 -111.7100      10.9        67       124        60
OIR    2025250     91400   17.9900 -111.7200      10.9        67       125        60
OIR    2025250     91400   17.9900 -111.7300      10.8        66       124        60
OIR    2025250     91400   17.9900 -111.7400      10.8        66       124        60
OIR    2025250     91400   17.9900 -111.7500      10.8        66       124        60
OIR    2025250     91400   17.9900 -111.7600      10.8        66       125        60
OIR    2025250     91400   17.9900 -111.7700      10.8        66       122        60
OIR    2025250     91400   17.9900 -111.7800      10.8        66       119        60
OIR    2025250     91400   17.9900 -111.7900      10.9        65       116        60
OIR    2025250     91400   17.9900 -111.8000      11.0        65       115        60
OIR    2025250     91400   17.9900 -111.8100      11.1        64       114        60
OIR    2025250     91400   17.9900 -111.8200      11.3        63       116        60
OIR    2025250     91400   17.9900 -111.8300      11.5        63       119        60
OIR    2025250     91400   17.9900 -111.8400      11.6        63       123        60
OIR    2025250     91400   17.9900 -111.8500      11.7        62       126        60
OIR    2025250     91400   17.9900 -111.8600      11.9        61       129        60
OIR    2025250     91400   17.9900 -111.8700      12.0        60       129        60
OIR    2025250     91400   17.9900 -111.8800      12.1        59       129        60
OIR    2025250     91400   17.9900 -111.8900      12.1        58       130        60
OIR    2025250     91400   17.9900 -111.9000      12.0        57       130        60
OIR    2025250     91400   17.9900 -111.9100      12.0        56       129        60
OIR    2025250     91400   17.9900 -111.9200      11.9        55       127        60
OIR    2025250     91400   17.9900 -111.9300      12.0        55       125        60
OIR    2025250     91400   17.9900 -111.9400      12.2        56       123        60
OIR    2025250     91400   17.9900 -111.9500      12.4        57       122        60
OIR    2025250     91400   17.9900 -111.9600      12.6        58       121        60
OIR    2025250     91400   17.9900 -111.9700      12.6        59       119        60
OIR    2025250     91400   17.9900 -111.9800      12.5        61       116        60
OIR    2025250     91400   17.9900 -111.9900      12.2        63       114        60
OIR    2025250     91400   17.9900 -112.0000      11.6        67       112        60
OIR    2025250     91400   17.9900 -112.0100      11.5        70       110        60
OIR    2025250     91400   17.9900 -112.0200      11.4        73       109        60
OIR    2025250     91400   17.9900 -112.0300      11.1        74       107        60
OIR    2025250     91400   17.9900 -112.0400      11.1        75       104        60
OIR    2025250     91400   17.9900 -112.0500      11.0        76       103        60
OIR    2025250     91400   17.9900 -112.0600      11.0        77       103        60
OIR    2025250     91400   17.9900 -112.0700      10.9        77       103        60
OIR    2025250     91400   17.9900 -112.0800      10.9        77       103        60
OIR    2025250     91400   17.9900 -112.0900      10.9        77       103        60
OIR    2025250     91400   17.9900 -112.1000      10.8        77       103        60
OIR    2025250     91400   17.9900 -112.1100      10.8        77       103        60
OIR    2025250     91400   17.9900 -112.1200      10.8        77       103        60
OIR    2025250     91400   17.9900 -112.1300      10.8        78       103        60
OIR    2025250     91400   17.9900 -112.1400      10.8        78       103        60
OIR    2025250     91400   17.9900 -112.1500      10.8        78       103        60
OIR    2025250     91400   17.9900 -112.1600      10.7        78       103        60
OIR    2025250     91400   17.9900 -112.1700      10.7        78       104        60
OIR    2025250     91400   17.9900 -112.1800      10.6        78       105        60
OIR    2025250     91400   17.9900 -112.1900      10.5        78       107        60
OIR    2025250     91400   17.9900 -112.2000      10.0        79       109        60
OIR    2025250     91400   17.9900 -112.2100       9.8        80       109        60
OIR    2025250     91400   17.9900 -112.2200       9.7        80       108        60
OIR    2025250     91400   17.9900 -112.2300       9.8        81       107        60
OIR    2025250     91400   17.9900 -112.2400       9.8        82       105        60
OIR    2025250     91400   17.9900 -112.2500      10.0        83       104        60
OIR    2025250     91400   17.9900 -112.2600      10.2        84       104        60
OIR    2025250     91400   17.9900 -112.2700      10.3        84       104        60
OIR    2025250     91400   17.9900 -112.2800      10.4        85       104        60
OIR    2025250     91400   17.9900 -112.2900      10.6        85       104        60
OIR    2025250     91400   17.9900 -112.3000      10.8        85       105        60
OIR    2025250     91400   17.9900 -112.3100      11.1        83       105        60
OIR    2025250     91400   17.9900 -112.3200      11.5        81       107        60
OIR    2025250     91400   17.9900 -112.3300      11.7        79       108        60
OIR    2025250     91400   17.9900 -112.3400      11.5        78       109        60
OIR    2025250     91400   17.9900 -112.3500      11.2        80       111        60
OIR    2025250     91400   17.9900 -112.3600      10.0        89       112        60
OIR    2025250     91400   17.9900 -112.3700       9.4        96       113        60
OIR    2025250     91400   17.9900 -112.3800       9.3        98       110        60
OIR    2025250     91400   17.9900 -112.3900       9.1        99       107        60
OIR    2025250     91400   17.9900 -112.4000       8.9       100       104        60
OIR    2025250     91400   17.9900 -112.4100       8.8       102       104        60
OIR    2025250     91400   17.9900 -112.4200       8.3       107       103        60
OIR    2025250     91400   17.9900 -112.4300       7.8       112       103        60
OIR    2025250     91400   17.9900 -112.4400       7.4       116       103        60
OIR    2025250     91400   17.9900 -112.4500       7.4       118       103        60
OIR    2025250     91400   17.9900 -112.4600       7.4       119       103        60
OIR    2025250     91400   17.9900 -112.4700       7.5       120       103        60
OIR    2025250     91400   17.9900 -112.4800       7.2       119       103        60
OIR    2025250     91400   17.9900 -112.4900       7.2       118       103        60
OIR    2025250     91400   17.9900 -112.5000       7.1       117       103        60
OIR    2025250     91400   17.9900 -112.5100       7.1       116       103        60
OIR    2025250     91400   17.9900 -112.5200       7.0       116       104        60
OIR    2025250     91400   17.9900 -112.5300       6.9       115       104        60
OIR    2025250     91400   17.9900 -112.5400       6.8       116       109        60
OIR    2025250     91400   17.9900 -112.5500       6.5       117       112        60
OIR    2025250     91400   17.9900 -112.5600       6.0       119       112        60
OIR    2025250     91400   17.9900 -112.5700       5.1       123       110        60
OIR    2025250     91400   17.9900 -112.5800       4.3       127       109        60
OIR    2025250     91400   17.9900 -113.4800       4.4        37       139        60
OIR    2025250     91400   17.9900 -113.4900       4.3        33       132        60
OIR    2025250     91400   17.9900 -113.5000       4.1        28       128        60
OIR    2025250     91400   17.9900 -113.5100       4.0        26       127        60
OIR    2025250     91400   17.9800 -110.3700      13.3        47       142        60
OIR    2025250     91400   17.9800 -110.3800      13.5        48       140        60
OIR    2025250     91400   17.9800 -110.3900      13.7        48       139        60
OIR    2025250     91400   17.9800 -110.4000      13.9        49       138        60
OIR    2025250     91400   17.9800 -110.4100      14.2        50       137        60
OIR    2025250     91400   17.9800 -110.4200      14.6        50       136        60
OIR    2025250     91400   17.9800 -110.4300      15.0        51       135        60
OIR    2025250     91400   17.9800 -110.4400      15.2        52       135        60
OIR    2025250     91400   17.9800 -110.4500      15.4        52       134        60
OIR    2025250     91400   17.9800 -110.4600      15.6        52       133        60
OIR    2025250     91400   17.9800 -110.4700      15.8        53       132        60
OIR    2025250     91400   17.9800 -110.4800      15.9        53       132        60
OIR    2025250     91400   17.9800 -110.4900      16.0        53       132        60
OIR    2025250     91400   17.9800 -110.5000      16.0        53       129        60
OIR    2025250     91400   17.9800 -110.5100      16.1        53       127        60
OIR    2025250     91400   17.9800 -110.5200      16.1        54       125        60
OIR    2025250     91400   17.9800 -110.5300      16.2        54       125        60
OIR    2025250     91400   17.9800 -110.5400      16.2        54       125        60
OIR    2025250     91400   17.9800 -110.5500      16.2        54       127        60
OIR    2025250     91400   17.9800 -110.5600      16.2        54       129        60
OIR    2025250     91400   17.9800 -110.5700      16.2        54       127        60
OIR    2025250     91400   17.9800 -110.5800      16.2        54       125        60
OIR    2025250     91400   17.9800 -110.5900      16.2        54       124        60
OIR    2025250     91400   17.9800 -110.6000      16.2        54       122        60
OIR    2025250     91400   17.9800 -110.6100      16.2        54       120        60
OIR    2025250     91400   17.9800 -110.6200      16.2        54       123        60
OIR    2025250     91400   17.9800 -110.6300      16.2        54       127        60
OIR    2025250     91400   17.9800 -110.6400      16.2        54       128        60
OIR    2025250     91400   17.9800 -110.6500      16.2        54       128        60
OIR    2025250     91400   17.9800 -110.6600      16.2        54       129        60
OIR    2025250     91400   17.9800 -110.6700      16.2        55       134        60
OIR    2025250     91400   17.9800 -110.6800      16.2        55       139        60
OIR    2025250     91400   17.9800 -110.6900      16.2        55       142        60
OIR    2025250     91400   17.9800 -111.0800      19.7        62       139        60
OIR    2025250     91400   17.9800 -111.0900      19.4        62       135        60
OIR    2025250     91400   17.9800 -111.1000      18.7        61       133        60
OIR    2025250     91400   17.9800 -111.1100      17.6        60       133        60
OIR    2025250     91400   17.9800 -111.1200      17.3        60       136        60
OIR    2025250     91400   17.9800 -111.1300      17.1        59       138        60
OIR    2025250     91400   17.9800 -111.1400      17.0        59       140        60
OIR    2025250     91400   17.9800 -111.1500      16.9        59       141        60
OIR    2025250     91400   17.9800 -111.3800      15.7        62       144        60
OIR    2025250     91400   17.9800 -111.3900      15.9        62       140        60
OIR    2025250     91400   17.9800 -111.4000      15.9        63       139        60
OIR    2025250     91400   17.9800 -111.4100      15.8        64       138        60
OIR    2025250     91400   17.9800 -111.4200      15.5        65       137        60
OIR    2025250     91400   17.9800 -111.4300      15.2        65       139        60
OIR    2025250     91400   17.9800 -111.4400      15.0        65       140        60
OIR    2025250     91400   17.9800 -111.4500      14.9        66       138        60
OIR    2025250     91400   17.9800 -111.4600      14.6        67       136        60
OIR    2025250     91400   17.9800 -111.4700      14.3        69       134        60
OIR    2025250     91400   17.9800 -111.4800      14.2        70       132        60
OIR    2025250     91400   17.9800 -111.4900      14.2        71       130        60
OIR    2025250     91400   17.9800 -111.5000      14.2        71       128        60
OIR    2025250     91400   17.9800 -111.5100      14.1        71       126        60
OIR    2025250     91400   17.9800 -111.5200      14.0        71       121        60
OIR    2025250     91400   17.9800 -111.5300      14.0        71       115        60
OIR    2025250     91400   17.9800 -111.5400      13.9        71       116        60
OIR    2025250     91400   17.9800 -111.5500      13.8        71       116        60
OIR    2025250     91400   17.9800 -111.5600      13.5        70       116        60
OIR    2025250     91400   17.9800 -111.5700      13.2        70       116        60
OIR    2025250     91400   17.9800 -111.5800      13.0        69       117        60
OIR    2025250     91400   17.9800 -111.5900      12.6        68       116        60
OIR    2025250     91400   17.9800 -111.6000      12.2        67       114        60
OIR    2025250     91400   17.9800 -111.6100      12.0        67       112        60
OIR    2025250     91400   17.9800 -111.6200      11.7        67       111        60
OIR    2025250     91400   17.9800 -111.6300      11.6        66       112        60
OIR    2025250     91400   17.9800 -111.6400      11.5        67       113        60
OIR    2025250     91400   17.9800 -111.6500      11.3        67       115        60
OIR    2025250     91400   17.9800 -111.6600      11.2        67       119        60
OIR    2025250     91400   17.9800 -111.6700      11.2        67       124        60
OIR    2025250     91400   17.9800 -111.6800      11.1        67       125        60
OIR    2025250     91400   17.9800 -111.6900      11.1        67       126        60
OIR    2025250     91400   17.9800 -111.7000      11.0        67       126        60
OIR    2025250     91400   17.9800 -111.7100      11.0        66       126        60
OIR    2025250     91400   17.9800 -111.7200      10.9        66       126        60
OIR    2025250     91400   17.9800 -111.7300      10.9        66       126        60
OIR    2025250     91400   17.9800 -111.7400      10.8        66       126        60
OIR    2025250     91400   17.9800 -111.7500      10.8        66       126        60
OIR    2025250     91400   17.9800 -111.7600      10.8        66       126        60
OIR    2025250     91400   17.9800 -111.7700      10.8        66       125        60
OIR    2025250     91400   17.9800 -111.7800      10.8        65       122        60
OIR    2025250     91400   17.9800 -111.7900      10.9        65       119        60
OIR    2025250     91400   17.9800 -111.8000      11.1        65       116        60
OIR    2025250     91400   17.9800 -111.8100      11.2        64       115        60
OIR    2025250     91400   17.9800 -111.8200      11.3        64       116        60
OIR    2025250     91400   17.9800 -111.8300      11.4        63       116        60
OIR    2025250     91400   17.9800 -111.8400      11.6        63       120        60
OIR    2025250     91400   17.9800 -111.8500      11.7        62       124        60
OIR    2025250     91400   17.9800 -111.8600      11.9        61       127        60
OIR    2025250     91400   17.9800 -111.8700      12.1        60       128        60
OIR    2025250     91400   17.9800 -111.8800      12.2        59       129        60
OIR    2025250     91400   17.9800 -111.8900      12.3        58       129        60
OIR    2025250     91400   17.9800 -111.9000      12.3        58       128        60
OIR    2025250     91400   17.9800 -111.9100      12.4        57       128        60
OIR    2025250     91400   17.9800 -111.9200      12.5        57       126        60
OIR    2025250     91400   17.9800 -111.9300      12.7        58       125        60
OIR    2025250     91400   17.9800 -111.9400      12.8        58       123        60
OIR    2025250     91400   17.9800 -111.9500      12.9        58       122        60
OIR    2025250     91400   17.9800 -111.9600      12.9        59       120        60
OIR    2025250     91400   17.9800 -111.9700      12.9        59       117        60
OIR    2025250     91400   17.9800 -111.9800      12.9        59       116        60
OIR    2025250     91400   17.9800 -111.9900      12.7        60       114        60
OIR    2025250     91400   17.9800 -112.0000      12.6        60       113        60
OIR    2025250     91400   17.9800 -112.0100      12.7        60       110        60
OIR    2025250     91400   17.9800 -112.0200      12.6        61       107        60
OIR    2025250     91400   17.9800 -112.0300      11.8        64       105        60
OIR    2025250     91400   17.9800 -112.0400      11.2        69       104        60
OIR    2025250     91400   17.9800 -112.0500      11.0        74       103        60
OIR    2025250     91400   17.9800 -112.0600      11.0        76       103        60
OIR    2025250     91400   17.9800 -112.0700      10.9        77       103        60
OIR    2025250     91400   17.9800 -112.0800      10.9        77       103        60
OIR    2025250     91400   17.9800 -112.0900      10.9        77       103        60
OIR    2025250     91400   17.9800 -112.1000      10.8        77       103        60
OIR    2025250     91400   17.9800 -112.1100      10.8        77       103        60
OIR    2025250     91400   17.9800 -112.1200      10.8        77       103        60
OIR    2025250     91400   17.9800 -112.1300      10.8        77       103        60
OIR    2025250     91400   17.9800 -112.1400      10.8        77       103        60
OIR    2025250     91400   17.9800 -112.1500      10.8        77       103        60
OIR    2025250     91400   17.9800 -112.1600      10.7        77       103        60
OIR    2025250     91400   17.9800 -112.1700      10.7        77       104        60
OIR    2025250     91400   17.9800 -112.1800      10.6        77       107        60
OIR    2025250     91400   17.9800 -112.1900      10.4        77       109        60
OIR    2025250     91400   17.9800 -112.2000      10.3        76       110        60
OIR    2025250     91400   17.9800 -112.2100      10.1        76       111        60
OIR    2025250     91400   17.9800 -112.2200       9.7        74       110        60
OIR    2025250     91400   17.9800 -112.2300       9.6        69       110        60
OIR    2025250     91400   17.9800 -112.2400       9.7        69       109        60
OIR    2025250     91400   17.9800 -112.2500       9.9        74       107        60
OIR    2025250     91400   17.9800 -112.2600      10.2        79       107        60
OIR    2025250     91400   17.9800 -112.2700      10.5        83       107        60
OIR    2025250     91400   17.9800 -112.2800      10.7        84       107        60
OIR    2025250     91400   17.9800 -112.2900      11.2        84       107        60
OIR    2025250     91400   17.9800 -112.3000      11.8        82       107        60
OIR    2025250     91400   17.9800 -112.3100      11.9        79       107        60
OIR    2025250     91400   17.9800 -112.3200      12.1        75       105        60
OIR    2025250     91400   17.9800 -112.3300      12.3        73       105        60
OIR    2025250     91400   17.9800 -112.3400      11.8        72       107        60
OIR    2025250     91400   17.9800 -112.3500      11.3        74       108        60
OIR    2025250     91400   17.9800 -112.3600      10.6        78       110        60
OIR    2025250     91400   17.9800 -112.3700       9.3        90       112        60
OIR    2025250     91400   17.9800 -112.3800       8.8        97       109        60
OIR    2025250     91400   17.9800 -112.3900       8.8        98       105        60
OIR    2025250     91400   17.9800 -112.4000       8.7        99       104        60
OIR    2025250     91400   17.9800 -112.4100       8.4       101       104        60
OIR    2025250     91400   17.9800 -112.4200       7.6       106       103        60
OIR    2025250     91400   17.9800 -112.4300       7.1       111       103        60
OIR    2025250     91400   17.9800 -112.4400       6.9       115       103        60
OIR    2025250     91400   17.9800 -112.4500       6.8       117       103        60
OIR    2025250     91400   17.9800 -112.4600       6.8       118       103        60
OIR    2025250     91400   17.9800 -112.4700       6.8       118       103        60
OIR    2025250     91400   17.9800 -112.4800       6.9       117       104        60
OIR    2025250     91400   17.9800 -112.4900       6.9       117       104        60
OIR    2025250     91400   17.9800 -112.5000       6.9       116       104        60
OIR    2025250     91400   17.9800 -112.5100       6.9       115       104        60
OIR    2025250     91400   17.9800 -112.5200       6.8       115       105        60
OIR    2025250     91400   17.9800 -112.5300       6.8       114       107        60
OIR    2025250     91400   17.9800 -112.5400       6.7       115       109        60
OIR    2025250     91400   17.9800 -112.5500       6.5       115       111        60
OIR    2025250     91400   17.9800 -112.5600       5.7       116       112        60
OIR    2025250     91400   17.9800 -112.5700       4.7       119       111        60
OIR    2025250     91400   17.9800 -112.5800       4.1       123       110        60
OIR    2025250     91400   17.9800 -113.4900       4.2        31       136        60
OIR    2025250     91400   17.9800 -113.5000       4.1        27       129        60
OIR    2025250     91400   17.9800 -113.5100       4.0        26       127        60
OIR    2025250     91400   17.9800 -113.5200       4.0        25       125        60
OIR    2025250     91400   17.9700 -110.3800      13.4        47       142        60
OIR    2025250     91400   17.9700 -110.3900      13.6        48       141        60
OIR    2025250     91400   17.9700 -110.4000      13.8        49       139        60
OIR    2025250     91400   17.9700 -110.4100      14.0        49       138        60
OIR    2025250     91400   17.9700 -110.4200      14.4        50       136        60
OIR    2025250     91400   17.9700 -110.4300      15.0        51       135        60
OIR    2025250     91400   17.9700 -110.4400      15.2        52       135        60
OIR    2025250     91400   17.9700 -110.4500      15.3        52       134        60
OIR    2025250     91400   17.9700 -110.4600      15.6        52       134        60
OIR    2025250     91400   17.9700 -110.4700      15.8        53       133        60
OIR    2025250     91400   17.9700 -110.4800      15.9        53       133        60
OIR    2025250     91400   17.9700 -110.4900      16.0        53       133        60
OIR    2025250     91400   17.9700 -110.5000      16.1        53       131        60
OIR    2025250     91400   17.9700 -110.5100      16.1        53       129        60
OIR    2025250     91400   17.9700 -110.5200      16.1        54       128        60
OIR    2025250     91400   17.9700 -110.5300      16.2        54       129        60
OIR    2025250     91400   17.9700 -110.5400      16.2        54       130        60
OIR    2025250     91400   17.9700 -110.5500      16.2        54       130        60
OIR    2025250     91400   17.9700 -110.5600      16.2        54       130        60
OIR    2025250     91400   17.9700 -110.5700      16.2        54       127        60
OIR    2025250     91400   17.9700 -110.5800      16.2        54       123        60
OIR    2025250     91400   17.9700 -110.5900      16.2        54       120        60
OIR    2025250     91400   17.9700 -110.6000      16.2        54       119        60
OIR    2025250     91400   17.9700 -110.6100      16.2        54       117        60
OIR    2025250     91400   17.9700 -110.6200      16.2        54       120        60
OIR    2025250     91400   17.9700 -110.6300      16.2        54       121        60
OIR    2025250     91400   17.9700 -110.6400      16.2        54       123        60
OIR    2025250     91400   17.9700 -110.6500      16.2        54       124        60
OIR    2025250     91400   17.9700 -110.6600      16.2        55       125        60
OIR    2025250     91400   17.9700 -110.6700      16.2        55       129        60
OIR    2025250     91400   17.9700 -110.6800      16.2        55       133        60
OIR    2025250     91400   17.9700 -110.6900      16.2        55       137        60
OIR    2025250     91400   17.9700 -110.7000      16.2        55       141        60
OIR    2025250     91400   17.9700 -111.0800      19.5        62       141        60
OIR    2025250     91400   17.9700 -111.0900      18.9        62       136        60
OIR    2025250     91400   17.9700 -111.1000      18.1        61       135        60
OIR    2025250     91400   17.9700 -111.1100      17.3        61       135        60
OIR    2025250     91400   17.9700 -111.1200      17.1        60       137        60
OIR    2025250     91400   17.9700 -111.1300      16.9        60       139        60
OIR    2025250     91400   17.9700 -111.1400      16.8        60       141        60
OIR    2025250     91400   17.9700 -111.4000      16.4        63       144        60
OIR    2025250     91400   17.9700 -111.4100      16.5        63       143        60
OIR    2025250     91400   17.9700 -111.4200      16.4        63       142        60
OIR    2025250     91400   17.9700 -111.4300      15.8        63       141        60
OIR    2025250     91400   17.9700 -111.4400      15.3        64       139        60
OIR    2025250     91400   17.9700 -111.4500      15.0        65       137        60
OIR    2025250     91400   17.9700 -111.4600      14.7        67       135        60
OIR    2025250     91400   17.9700 -111.4700      14.4        70       133        60
OIR    2025250     91400   17.9700 -111.4800      14.3        71       131        60
OIR    2025250     91400   17.9700 -111.4900      14.2        71       130        60
OIR    2025250     91400   17.9700 -111.5000      14.2        71       128        60
OIR    2025250     91400   17.9700 -111.5100      14.2        71       126        60
OIR    2025250     91400   17.9700 -111.5200      14.2        71       124        60
OIR    2025250     91400   17.9700 -111.5300      14.2        71       121        60
OIR    2025250     91400   17.9700 -111.5400      14.1        71       120        60
OIR    2025250     91400   17.9700 -111.5500      14.1        71       119        60
OIR    2025250     91400   17.9700 -111.5600      13.9        71       119        60
OIR    2025250     91400   17.9700 -111.5700      13.7        70       117        60
OIR    2025250     91400   17.9700 -111.5800      13.5        70       116        60
OIR    2025250     91400   17.9700 -111.5900      13.2        69       115        60
OIR    2025250     91400   17.9700 -111.6000      12.8        68       113        60
OIR    2025250     91400   17.9700 -111.6100      12.4        67       112        60
OIR    2025250     91400   17.9700 -111.6200      12.2        67       112        60
OIR    2025250     91400   17.9700 -111.6300      12.0        67       112        60
OIR    2025250     91400   17.9700 -111.6400      11.9        67       114        60
OIR    2025250     91400   17.9700 -111.6500      11.8        67       115        60
OIR    2025250     91400   17.9700 -111.6600      11.6        66       119        60
OIR    2025250     91400   17.9700 -111.6700      11.4        66       122        60
OIR    2025250     91400   17.9700 -111.6800      11.3        66       125        60
OIR    2025250     91400   17.9700 -111.6900      11.2        66       126        60
OIR    2025250     91400   17.9700 -111.7000      11.2        66       127        60
OIR    2025250     91400   17.9700 -111.7100      11.1        66       128        60
OIR    2025250     91400   17.9700 -111.7200      11.0        66       128        60
OIR    2025250     91400   17.9700 -111.7300      11.0        66       128        60
OIR    2025250     91400   17.9700 -111.7400      10.9        66       127        60
OIR    2025250     91400   17.9700 -111.7500      10.8        66       127        60
OIR    2025250     91400   17.9700 -111.7600      10.8        66       127        60
OIR    2025250     91400   17.9700 -111.7700      10.8        65       127        60
OIR    2025250     91400   17.9700 -111.7800      10.8        65       124        60
OIR    2025250     91400   17.9700 -111.7900      11.0        65       121        60
OIR    2025250     91400   17.9700 -111.8000      11.1        65       119        60
OIR    2025250     91400   17.9700 -111.8100      11.2        64       116        60
OIR    2025250     91400   17.9700 -111.8200      11.3        64       115        60
OIR    2025250     91400   17.9700 -111.8300      11.4        63       116        60
OIR    2025250     91400   17.9700 -111.8400      11.5        63       116        60
OIR    2025250     91400   17.9700 -111.8500      11.7        62       122        60
OIR    2025250     91400   17.9700 -111.8600      11.9        61       126        60
OIR    2025250     91400   17.9700 -111.8700      12.2        59       127        60
OIR    2025250     91400   17.9700 -111.8800      12.3        59       127        60
OIR    2025250     91400   17.9700 -111.8900      12.4        58       127        60
OIR    2025250     91400   17.9700 -111.9000      12.5        58       127        60
OIR    2025250     91400   17.9700 -111.9100      12.6        58       127        60
OIR    2025250     91400   17.9700 -111.9200      12.8        58       126        60
OIR    2025250     91400   17.9700 -111.9300      12.9        58       125        60
OIR    2025250     91400   17.9700 -111.9400      13.0        58       124        60
OIR    2025250     91400   17.9700 -111.9500      13.0        58       122        60
OIR    2025250     91400   17.9700 -111.9600      13.0        58       120        60
OIR    2025250     91400   17.9700 -111.9700      13.0        59       116        60
OIR    2025250     91400   17.9700 -111.9800      13.0        59       115        60
OIR    2025250     91400   17.9700 -111.9900      12.9        59       115        60
OIR    2025250     91400   17.9700 -112.0000      12.9        59       115        60
OIR    2025250     91400   17.9700 -112.0100      13.0        59       112        60
OIR    2025250     91400   17.9700 -112.0200      12.9        59       109        60
OIR    2025250     91400   17.9700 -112.0300      12.6        60       105        60
OIR    2025250     91400   17.9700 -112.0400      11.5        65       104        60
OIR    2025250     91400   17.9700 -112.0500      11.0        73       103        60
OIR    2025250     91400   17.9700 -112.0600      10.9        76       103        60
OIR    2025250     91400   17.9700 -112.0700      10.9        76       103        60
OIR    2025250     91400   17.9700 -112.0800      10.9        77       103        60
OIR    2025250     91400   17.9700 -112.0900      10.9        77       103        60
OIR    2025250     91400   17.9700 -112.1000      10.8        77       103        60
OIR    2025250     91400   17.9700 -112.1100      10.8        77       103        60
OIR    2025250     91400   17.9700 -112.1200      10.8        77       103        60
OIR    2025250     91400   17.9700 -112.1300      10.8        77       103        60
OIR    2025250     91400   17.9700 -112.1400      10.8        77       103        60
OIR    2025250     91400   17.9700 -112.1500      10.7        77       103        60
OIR    2025250     91400   17.9700 -112.1600      10.7        77       103        60
OIR    2025250     91400   17.9700 -112.1700      10.6        77       104        60
OIR    2025250     91400   17.9700 -112.1800      10.5        76       107        60
OIR    2025250     91400   17.9700 -112.1900      10.4        76       109        60
OIR    2025250     91400   17.9700 -112.2000      10.2        75       109        60
OIR    2025250     91400   17.9700 -112.2100      10.1        74       110        60
OIR    2025250     91400   17.9700 -112.2200       9.5        67       110        60
OIR    2025250     91400   17.9700 -112.2300       9.4        64       110        60
OIR    2025250     91400   17.9700 -112.2400       9.5        67       109        60
OIR    2025250     91400   17.9700 -112.2500       9.8        72       107        60
OIR    2025250     91400   17.9700 -112.2600      10.2        78       105        60
OIR    2025250     91400   17.9700 -112.2700      10.6        82       107        60
OIR    2025250     91400   17.9700 -112.2800      11.5        81       107        60
OIR    2025250     91400   17.9700 -112.2900      12.9        79       107        60
OIR    2025250     91400   17.9700 -112.3000      13.6        75       108        60
OIR    2025250     91400   17.9700 -112.3100      13.7        70       107        60
OIR    2025250     91400   17.9700 -112.3200      13.3        68       105        60
OIR    2025250     91400   17.9700 -112.3300      12.9        68       104        60
OIR    2025250     91400   17.9700 -112.3400      12.2        68       104        60
OIR    2025250     91400   17.9700 -112.3500      11.0        70       104        60
OIR    2025250     91400   17.9700 -112.3600      10.3        72       108        60
OIR    2025250     91400   17.9700 -112.3700       9.5        79       111        60
OIR    2025250     91400   17.9700 -112.3800       7.9        90       109        60
OIR    2025250     91400   17.9700 -112.3900       8.0        94       105        60
OIR    2025250     91400   17.9700 -112.4000       8.1        97       104        60
OIR    2025250     91400   17.9700 -112.4100       7.7        99       104        60
OIR    2025250     91400   17.9700 -112.4200       6.8       104       103        60
OIR    2025250     91400   17.9700 -112.4300       6.5       109       103        60
OIR    2025250     91400   17.9700 -112.4400       6.5       114       103        60
OIR    2025250     91400   17.9700 -112.4500       6.6       116       103        60
OIR    2025250     91400   17.9700 -112.4600       6.7       117       103        60
OIR    2025250     91400   17.9700 -112.4700       6.7       117       103        60
OIR    2025250     91400   17.9700 -112.4800       6.8       117       104        60
OIR    2025250     91400   17.9700 -112.4900       6.8       116       104        60
OIR    2025250     91400   17.9700 -112.5000       6.8       116       105        60
OIR    2025250     91400   17.9700 -112.5100       6.7       115       105        60
OIR    2025250     91400   17.9700 -112.5200       6.7       114       107        60
OIR    2025250     91400   17.9700 -112.5300       6.7       114       109        60
OIR    2025250     91400   17.9700 -112.5400       6.5       113       110        60
OIR    2025250     91400   17.9700 -112.5500       6.1       113       111        60
OIR    2025250     91400   17.9700 -112.5600       5.3       112       111        60
OIR    2025250     91400   17.9700 -112.5700       4.5       114       112        60
OIR    2025250     91400   17.9700 -112.5800       4.0       118       112        60
OIR    2025250     91400   17.9700 -113.4900       4.2        29       141        60
OIR    2025250     91400   17.9700 -113.5000       4.1        26       134        60
OIR    2025250     91400   17.9700 -113.5100       4.1        26       131        60
OIR    2025250     91400   17.9700 -113.8600       4.4        12       139        60
OIR    2025250     91400   17.9700 -113.8700       4.6        13       139        60
OIR    2025250     91400   17.9700 -113.8800       4.5        14       137        60
OIR    2025250     91400   17.9700 -113.8900       4.4        15       137        60
OIR    2025250     91400   17.9700 -113.9000       4.0        17       139        60
OIR    2025250     91400   17.9600 -110.4000      13.7        49       143        60
OIR    2025250     91400   17.9600 -110.4100      14.0        49       141        60
OIR    2025250     91400   17.9600 -110.4200      14.3        50       138        60
OIR    2025250     91400   17.9600 -110.4300      14.9        51       137        60
OIR    2025250     91400   17.9600 -110.4400      15.2        52       137        60
OIR    2025250     91400   17.9600 -110.4500      15.3        52       136        60
OIR    2025250     91400   17.9600 -110.4600      15.6        52       135        60
OIR    2025250     91400   17.9600 -110.4700      15.8        53       134        60
OIR    2025250     91400   17.9600 -110.4800      16.0        53       134        60
OIR    2025250     91400   17.9600 -110.4900      16.1        53       134        60
OIR    2025250     91400   17.9600 -110.5000      16.1        53       133        60
OIR    2025250     91400   17.9600 -110.5100      16.1        53       131        60
OIR    2025250     91400   17.9600 -110.5200      16.2        54       130        60
OIR    2025250     91400   17.9600 -110.5300      16.2        54       131        60
OIR    2025250     91400   17.9600 -110.5400      16.2        54       131        60
OIR    2025250     91400   17.9600 -110.5500      16.2        54       131        60
OIR    2025250     91400   17.9600 -110.5600      16.2        54       130        60
OIR    2025250     91400   17.9600 -110.5700      16.2        54       129        60
OIR    2025250     91400   17.9600 -110.5800      16.2        54       125        60
OIR    2025250     91400   17.9600 -110.5900      16.2        54       122        60
OIR    2025250     91400   17.9600 -110.6000      16.2        54       120        60
OIR    2025250     91400   17.9600 -110.6100      16.2        54       119        60
OIR    2025250     91400   17.9600 -110.6200      16.2        54       119        60
OIR    2025250     91400   17.9600 -110.6300      16.2        54       120        60
OIR    2025250     91400   17.9600 -110.6400      16.2        54       122        60
OIR    2025250     91400   17.9600 -110.6500      16.2        54       123        60
OIR    2025250     91400   17.9600 -110.6600      16.2        54       124        60
OIR    2025250     91400   17.9600 -110.6700      16.2        55       126        60
OIR    2025250     91400   17.9600 -110.6800      16.2        55       129        60
OIR    2025250     91400   17.9600 -110.6900      16.2        55       132        60
OIR    2025250     91400   17.9600 -110.7000      16.2        55       137        60
OIR    2025250     91400   17.9600 -110.7100      16.2        55       141        60
OIR    2025250     91400   17.9600 -110.7200      16.2        55       143        60
OIR    2025250     91400   17.9600 -110.8300      16.4        55       143        60
OIR    2025250     91400   17.9600 -111.0800      18.9        63       142        60
OIR    2025250     91400   17.9600 -111.0900      18.1        63       137        60
OIR    2025250     91400   17.9600 -111.1000      17.5        62       136        60
OIR    2025250     91400   17.9600 -111.1100      17.2        61       135        60
OIR    2025250     91400   17.9600 -111.1200      16.9        60       137        60
OIR    2025250     91400   17.9600 -111.1300      16.8        60       139        60
OIR    2025250     91400   17.9600 -111.1400      16.7        60       142        60
OIR    2025250     91400   17.9600 -111.4300      16.6        62       143        60
OIR    2025250     91400   17.9600 -111.4400      15.8        63       139        60
OIR    2025250     91400   17.9600 -111.4500      15.4        64       136        60
OIR    2025250     91400   17.9600 -111.4600      14.9        67       134        60
OIR    2025250     91400   17.9600 -111.4700      14.4        70       132        60
OIR    2025250     91400   17.9600 -111.4800      14.3        71       131        60
OIR    2025250     91400   17.9600 -111.4900      14.3        71       129        60
OIR    2025250     91400   17.9600 -111.5000      14.3        71       128        60
OIR    2025250     91400   17.9600 -111.5100      14.2        71       126        60
OIR    2025250     91400   17.9600 -111.5200      14.2        71       126        60
OIR    2025250     91400   17.9600 -111.5300      14.2        71       126        60
OIR    2025250     91400   17.9600 -111.5400      14.2        71       126        60
OIR    2025250     91400   17.9600 -111.5500      14.2        71       125        60
OIR    2025250     91400   17.9600 -111.5600      14.0        71       123        60
OIR    2025250     91400   17.9600 -111.5700      13.8        70       120        60
OIR    2025250     91400   17.9600 -111.5800      13.7        70       116        60
OIR    2025250     91400   17.9600 -111.5900      13.5        69       114        60
OIR    2025250     91400   17.9600 -111.6000      13.1        69       112        60
OIR    2025250     91400   17.9600 -111.6100      12.7        68       111        60
OIR    2025250     91400   17.9600 -111.6200      12.5        67       112        60
OIR    2025250     91400   17.9600 -111.6300      12.3        67       114        60
OIR    2025250     91400   17.9600 -111.6400      12.2        66       116        60
OIR    2025250     91400   17.9600 -111.6500      12.1        66       119        60
OIR    2025250     91400   17.9600 -111.6600      11.9        66       121        60
OIR    2025250     91400   17.9600 -111.6700      11.8        66       123        60
OIR    2025250     91400   17.9600 -111.6800      11.7        66       125        60
OIR    2025250     91400   17.9600 -111.6900      11.5        66       127        60
OIR    2025250     91400   17.9600 -111.7000      11.4        66       128        60
OIR    2025250     91400   17.9600 -111.7100      11.3        66       128        60
OIR    2025250     91400   17.9600 -111.7200      11.2        66       128        60
OIR    2025250     91400   17.9600 -111.7300      11.1        65       128        60
OIR    2025250     91400   17.9600 -111.7400      11.0        65       128        60
OIR    2025250     91400   17.9600 -111.7500      11.0        65       128        60
OIR    2025250     91400   17.9600 -111.7600      10.9        65       127        60
OIR    2025250     91400   17.9600 -111.7700      10.9        65       127        60
OIR    2025250     91400   17.9600 -111.7800      10.9        65       125        60
OIR    2025250     91400   17.9600 -111.7900      11.0        65       123        60
OIR    2025250     91400   17.9600 -111.8000      11.2        65       120        60
OIR    2025250     91400   17.9600 -111.8100      11.3        64       117        60
OIR    2025250     91400   17.9600 -111.8200      11.4        64       116        60
OIR    2025250     91400   17.9600 -111.8300      11.4        63       117        60
OIR    2025250     91400   17.9600 -111.8400      11.6        63       119        60
OIR    2025250     91400   17.9600 -111.8500      11.8        62       122        60
OIR    2025250     91400   17.9600 -111.8600      12.0        60       126        60
OIR    2025250     91400   17.9600 -111.8700      12.3        59       127        60
OIR    2025250     91400   17.9600 -111.8800      12.5        59       127        60
OIR    2025250     91400   17.9600 -111.8900      12.6        59       127        60
OIR    2025250     91400   17.9600 -111.9000      12.7        58       127        60
OIR    2025250     91400   17.9600 -111.9100      12.8        58       127        60
OIR    2025250     91400   17.9600 -111.9200      13.0        58       126        60
OIR    2025250     91400   17.9600 -111.9300      13.0        58       125        60
OIR    2025250     91400   17.9600 -111.9400      13.0        58       124        60
OIR    2025250     91400   17.9600 -111.9500      13.0        58       123        60
OIR    2025250     91400   17.9600 -111.9600      13.0        58       121        60
OIR    2025250     91400   17.9600 -111.9700      13.0        58       117        60
OIR    2025250     91400   17.9600 -111.9800      13.0        59       116        60
OIR    2025250     91400   17.9600 -111.9900      13.0        58       115        60
OIR    2025250     91400   17.9600 -112.0000      13.0        58       116        60
OIR    2025250     91400   17.9600 -112.0100      13.0        58       114        60
OIR    2025250     91400   17.9600 -112.0200      13.0        58       110        60
OIR    2025250     91400   17.9600 -112.0300      12.9        59       107        60
OIR    2025250     91400   17.9600 -112.0400      11.9        63       104        60
OIR    2025250     91400   17.9600 -112.0500      11.0        72       103        60
OIR    2025250     91400   17.9600 -112.0600      10.9        75       103        60
OIR    2025250     91400   17.9600 -112.0700      10.9        76       103        60
OIR    2025250     91400   17.9600 -112.0800      10.9        77       103        60
OIR    2025250     91400   17.9600 -112.0900      10.9        77       103        60
OIR    2025250     91400   17.9600 -112.1000      10.8        77       103        60
OIR    2025250     91400   17.9600 -112.1100      10.8        77       103        60
OIR    2025250     91400   17.9600 -112.1200      10.8        77       103        60
OIR    2025250     91400   17.9600 -112.1300      10.8        77       103        60
OIR    2025250     91400   17.9600 -112.1400      10.8        77       103        60
OIR    2025250     91400   17.9600 -112.1500      10.7        77       103        60
OIR    2025250     91400   17.9600 -112.1600      10.7        77       103        60
OIR    2025250     91400   17.9600 -112.1700      10.6        76       103        60
OIR    2025250     91400   17.9600 -112.1800      10.5        76       105        60
OIR    2025250     91400   17.9600 -112.1900      10.3        76       109        60
OIR    2025250     91400   17.9600 -112.2000      10.0        74       109        60
OIR    2025250     91400   17.9600 -112.2100       9.6        72       109        60
OIR    2025250     91400   17.9600 -112.2200       9.1        65       109        60
OIR    2025250     91400   17.9600 -112.2300       9.0        57       108        60
OIR    2025250     91400   17.9600 -112.2400      11.0        30       107        60
OIR    2025250     91400   17.9600 -112.2500      16.7        26       105        60
OIR    2025250     91400   17.9600 -112.2600      18.5        36       104        60
OIR    2025250     91400   17.9600 -112.2700      15.2        59       104        60
OIR    2025250     91400   17.9600 -112.2800      15.2        69       105        60
OIR    2025250     91400   17.9600 -112.2900      16.4        72       105        60
OIR    2025250     91400   17.9600 -112.3000      15.2        70       105        60
OIR    2025250     91400   17.9600 -112.3100      14.7        67       105        60
OIR    2025250     91400   17.9600 -112.3200      14.3        65       104        60
OIR    2025250     91400   17.9600 -112.3300      13.6        65       104        60
OIR    2025250     91400   17.9600 -112.3400      12.2        63       104        60
OIR    2025250     91400   17.9600 -112.3500      10.6        61       104        60
OIR    2025250     91400   17.9600 -112.3600       9.8        64       105        60
OIR    2025250     91400   17.9600 -112.3700       8.9        72       109        60
OIR    2025250     91400   17.9600 -112.3800       6.9        80       109        60
OIR    2025250     91400   17.9600 -112.3900       7.0        87       105        60
OIR    2025250     91400   17.9600 -112.4000       7.2        92       104        60
OIR    2025250     91400   17.9600 -112.4100       6.9        95       104        60
OIR    2025250     91400   17.9600 -112.4200       6.0       102       103        60
OIR    2025250     91400   17.9600 -112.4300       5.8       106       103        60
OIR    2025250     91400   17.9600 -112.4400       5.9       111       103        60
OIR    2025250     91400   17.9600 -112.4500       6.1       114       103        60
OIR    2025250     91400   17.9600 -112.4600       6.3       116       103        60
OIR    2025250     91400   17.9600 -112.4700       6.5       117       103        60
OIR    2025250     91400   17.9600 -112.4800       6.5       116       104        60
OIR    2025250     91400   17.9600 -112.4900       6.5       116       104        60
OIR    2025250     91400   17.9600 -112.5000       6.5       115       105        60
OIR    2025250     91400   17.9600 -112.5100       6.6       114       107        60
OIR    2025250     91400   17.9600 -112.5200       6.6       113       108        60
OIR    2025250     91400   17.9600 -112.5300       6.5       112       110        60
OIR    2025250     91400   17.9600 -112.5400       6.2       111       111        60
OIR    2025250     91400   17.9600 -112.5500       5.5       109       111        60
OIR    2025250     91400   17.9600 -112.5600       4.9       108       112        60
OIR    2025250     91400   17.9600 -112.5700       4.5       109       113        60
OIR    2025250     91400   17.9600 -112.5800       4.0       113       114        60
OIR    2025250     91400   17.9600 -113.5000       4.1        26       140        60
OIR    2025250     91400   17.9600 -113.5100       4.0        25       136        60
OIR    2025250     91400   17.9600 -113.6000       4.0        24       125        60
OIR    2025250     91400   17.9600 -113.6100       4.4        27       128        60
OIR    2025250     91400   17.9600 -113.6200       5.2        23       130        60
OIR    2025250     91400   17.9600 -113.6300       5.6        20       130        60
OIR    2025250     91400   17.9600 -113.6400       5.5        16       131        60
OIR    2025250     91400   17.9600 -113.6500       5.2         7       133        60
OIR    2025250     91400   17.9600 -113.6600       5.4       348       134        60
OIR    2025250     91400   17.9600 -113.6700       5.8       339       133        60
OIR    2025250     91400   17.9600 -113.6800       5.8       337       130        60
OIR    2025250     91400   17.9600 -113.6900       5.8       337       132        60
OIR    2025250     91400   17.9600 -113.7000       5.6       337       134        60
OIR    2025250     91400   17.9600 -113.7100       5.3       338       135        60
OIR    2025250     91400   17.9600 -113.7200       4.8       340       133        60
OIR    2025250     91400   17.9600 -113.8300       4.5         9       141        60
OIR    2025250     91400   17.9600 -113.8400       4.8        11       138        60
OIR    2025250     91400   17.9600 -113.8500       4.9        12       136        60
OIR    2025250     91400   17.9600 -113.8600       4.9        13       136        60
OIR    2025250     91400   17.9600 -113.8700       4.9        13       136        60
OIR    2025250     91400   17.9600 -113.8800       4.8        14       136        60
OIR    2025250     91400   17.9600 -113.8900       4.7        15       135        60
OIR    2025250     91400   17.9600 -113.9000       4.5        16       136        60
OIR    2025250     91400   17.9600 -113.9100       4.2        17       138        60
OIR    2025250     91400   17.9500 -110.4200      14.3        50       141        60
OIR    2025250     91400   17.9500 -110.4300      14.8        51       139        60
OIR    2025250     91400   17.9500 -110.4400      15.2        51       139        60
OIR    2025250     91400   17.9500 -110.4500      15.3        52       138        60
OIR    2025250     91400   17.9500 -110.4600      15.6        52       137        60
OIR    2025250     91400   17.9500 -110.4700      15.9        53       135        60
OIR    2025250     91400   17.9500 -110.4800      16.0        53       135        60
OIR    2025250     91400   17.9500 -110.4900      16.1        53       134        60
OIR    2025250     91400   17.9500 -110.5000      16.1        53       134        60
OIR    2025250     91400   17.9500 -110.5100      16.2        53       133        60
OIR    2025250     91400   17.9500 -110.5200      16.2        54       132        60
OIR    2025250     91400   17.9500 -110.5300      16.2        54       132        60
OIR    2025250     91400   17.9500 -110.5400      16.2        54       132        60
OIR    2025250     91400   17.9500 -110.5500      16.2        54       131        60
OIR    2025250     91400   17.9500 -110.5600      16.2        54       130        60
OIR    2025250     91400   17.9500 -110.5700      16.2        54       129        60
OIR    2025250     91400   17.9500 -110.5800      16.2        54       128        60
OIR    2025250     91400   17.9500 -110.5900      16.2        54       128        60
OIR    2025250     91400   17.9500 -110.6000      16.2        54       124        60
OIR    2025250     91400   17.9500 -110.6100      16.2        54       121        60
OIR    2025250     91400   17.9500 -110.6200      16.2        54       117        60
OIR    2025250     91400   17.9500 -110.6300      16.2        54       121        60
OIR    2025250     91400   17.9500 -110.6400      16.2        54       124        60
OIR    2025250     91400   17.9500 -110.6500      16.2        54       124        60
OIR    2025250     91400   17.9500 -110.6600      16.2        54       125        60
OIR    2025250     91400   17.9500 -110.6700      16.2        55       126        60
OIR    2025250     91400   17.9500 -110.6800      16.2        55       128        60
OIR    2025250     91400   17.9500 -110.6900      16.2        55       130        60
OIR    2025250     91400   17.9500 -110.7000      16.2        55       134        60
OIR    2025250     91400   17.9500 -110.7100      16.2        55       137        60
OIR    2025250     91400   17.9500 -110.7200      16.2        55       141        60
OIR    2025250     91400   17.9500 -110.8100      16.3        55       141        60
OIR    2025250     91400   17.9500 -110.8200      16.3        55       138        60
OIR    2025250     91400   17.9500 -110.8300      16.3        55       135        60
OIR    2025250     91400   17.9500 -110.8400      16.4        55       139        60
OIR    2025250     91400   17.9500 -110.8500      16.5        56       142        60
OIR    2025250     91400   17.9500 -111.0800      18.0        63       142        60
OIR    2025250     91400   17.9500 -111.0900      17.5        63       138        60
OIR    2025250     91400   17.9500 -111.1000      17.2        63       136        60
OIR    2025250     91400   17.9500 -111.1100      16.9        62       136        60
OIR    2025250     91400   17.9500 -111.1200      16.6        61       137        60
OIR    2025250     91400   17.9500 -111.1300      16.6        61       140        60
OIR    2025250     91400   17.9500 -111.1400      16.6        61       143        60
OIR    2025250     91400   17.9500 -111.4300      17.2        60       142        60
OIR    2025250     91400   17.9500 -111.4400      16.9        60       138        60
OIR    2025250     91400   17.9500 -111.4500      16.2        61       135        60
OIR    2025250     91400   17.9500 -111.4600      15.5        64       133        60
OIR    2025250     91400   17.9500 -111.4700      14.7        68       131        60
OIR    2025250     91400   17.9500 -111.4800      14.4        71       131        60
OIR    2025250     91400   17.9500 -111.4900      14.3        71       130        60
OIR    2025250     91400   17.9500 -111.5000      14.3        71       130        60
OIR    2025250     91400   17.9500 -111.5100      14.3        71       130        60
OIR    2025250     91400   17.9500 -111.5200      14.3        71       130        60
OIR    2025250     91400   17.9500 -111.5300      14.3        71       130        60
OIR    2025250     91400   17.9500 -111.5400      14.3        71       130        60
OIR    2025250     91400   17.9500 -111.5500      14.2        71       127        60
OIR    2025250     91400   17.9500 -111.5600      14.1        71       124        60
OIR    2025250     91400   17.9500 -111.5700      13.9        70       120        60
OIR    2025250     91400   17.9500 -111.5800      13.7        70       116        60
OIR    2025250     91400   17.9500 -111.5900      13.6        69       114        60
OIR    2025250     91400   17.9500 -111.6000      13.3        69       112        60
OIR    2025250     91400   17.9500 -111.6100      12.8        68       110        60
OIR    2025250     91400   17.9500 -111.6200      12.6        67       113        60
OIR    2025250     91400   17.9500 -111.6300      12.5        67       115        60
OIR    2025250     91400   17.9500 -111.6400      12.4        66       117        60
OIR    2025250     91400   17.9500 -111.6500      12.2        66       121        60
OIR    2025250     91400   17.9500 -111.6600      12.1        66       123        60
OIR    2025250     91400   17.9500 -111.6700      12.0        66       124        60
OIR    2025250     91400   17.9500 -111.6800      11.9        65       126        60
OIR    2025250     91400   17.9500 -111.6900      11.8        65       127        60
OIR    2025250     91400   17.9500 -111.7000      11.6        65       129        60
OIR    2025250     91400   17.9500 -111.7100      11.6        65       129        60
OIR    2025250     91400   17.9500 -111.7200      11.5        65       129        60
OIR    2025250     91400   17.9500 -111.7300      11.4        65       128        60
OIR    2025250     91400   17.9500 -111.7400      11.3        64       128        60
OIR    2025250     91400   17.9500 -111.7500      11.3        64       128        60
OIR    2025250     91400   17.9500 -111.7600      11.2        64       128        60
OIR    2025250     91400   17.9500 -111.7700      11.2        64       127        60
OIR    2025250     91400   17.9500 -111.7800      11.3        64       126        60
OIR    2025250     91400   17.9500 -111.7900      11.3        64       124        60
OIR    2025250     91400   17.9500 -111.8000      11.4        64       121        60
OIR    2025250     91400   17.9500 -111.8100      11.4        64       117        60
OIR    2025250     91400   17.9500 -111.8200      11.4        64       116        60
OIR    2025250     91400   17.9500 -111.8300      11.5        63       120        60
OIR    2025250     91400   17.9500 -111.8400      11.7        63       122        60
OIR    2025250     91400   17.9500 -111.8500      11.9        61       125        60
OIR    2025250     91400   17.9500 -111.8600      12.2        60       126        60
OIR    2025250     91400   17.9500 -111.8700      12.5        59       127        60
OIR    2025250     91400   17.9500 -111.8800      12.6        59       127        60
OIR    2025250     91400   17.9500 -111.8900      12.8        59       127        60
OIR    2025250     91400   17.9500 -111.9000      12.9        58       127        60
OIR    2025250     91400   17.9500 -111.9100      13.0        58       127        60
OIR    2025250     91400   17.9500 -111.9200      13.0        58       127        60
OIR    2025250     91400   17.9500 -111.9300      13.0        58       125        60
OIR    2025250     91400   17.9500 -111.9400      13.0        58       124        60
OIR    2025250     91400   17.9500 -111.9500      13.0        58       123        60
OIR    2025250     91400   17.9500 -111.9600      13.0        58       122        60
OIR    2025250     91400   17.9500 -111.9700      13.1        58       120        60
OIR    2025250     91400   17.9500 -111.9800      13.0        58       119        60
OIR    2025250     91400   17.9500 -111.9900      13.0        58       117        60
OIR    2025250     91400   17.9500 -112.0000      13.0        58       116        60
OIR    2025250     91400   17.9500 -112.0100      13.0        58       115        60
OIR    2025250     91400   17.9500 -112.0200      13.0        58       112        60
OIR    2025250     91400   17.9500 -112.0300      13.0        58       109        60
OIR    2025250     91400   17.9500 -112.0400      12.6        60       105        60
OIR    2025250     91400   17.9500 -112.0500      11.1        70       103        60
OIR    2025250     91400   17.9500 -112.0600      10.9        75       103        60
OIR    2025250     91400   17.9500 -112.0700      10.9        76       103        60
OIR    2025250     91400   17.9500 -112.0800      10.9        77       103        60
OIR    2025250     91400   17.9500 -112.0900      10.8        77       103        60
OIR    2025250     91400   17.9500 -112.1000      10.8        77       103        60
OIR    2025250     91400   17.9500 -112.1100      10.8        77       103        60
OIR    2025250     91400   17.9500 -112.1200      10.8        77       103        60
OIR    2025250     91400   17.9500 -112.1300      10.8        77       103        60
OIR    2025250     91400   17.9500 -112.1400      10.8        77       103        60
OIR    2025250     91400   17.9500 -112.1500      10.7        77       103        60
OIR    2025250     91400   17.9500 -112.1600      10.6        76       103        60
OIR    2025250     91400   17.9500 -112.1700      10.5        76       104        60
OIR    2025250     91400   17.9500 -112.1800      10.4        74       107        60
OIR    2025250     91400   17.9500 -112.1900      10.2        73       109        60
OIR    2025250     91400   17.9500 -112.2000       9.4        72       110        60
OIR    2025250     91400   17.9500 -112.2100       9.1        71       110        60
OIR    2025250     91400   17.9500 -112.2200       8.5        63       109        60
OIR    2025250     91400   17.9500 -112.2300      15.8       351       107        60
OIR    2025250     91400   17.9500 -112.2400      33.7       340       105        60
OIR    2025250     91400   17.9500 -112.2500      45.9       356       104        60
OIR    2025250     91400   17.9500 -112.2600      46.4        20       104        60
OIR    2025250     91400   17.9500 -112.2700      41.2        39       104        60
OIR    2025250     91400   17.9500 -112.2800      32.6        54       104        60
OIR    2025250     91400   17.9500 -112.2900      23.3        66       104        60
OIR    2025250     91400   17.9500 -112.3000      19.9        67       104        60
OIR    2025250     91400   17.9500 -112.3100      16.2        65       104        60
OIR    2025250     91400   17.9500 -112.3200      14.9        64       104        60
OIR    2025250     91400   17.9500 -112.3300      14.2        64       103        60
OIR    2025250     91400   17.9500 -112.3400      10.9        58       103        60
OIR    2025250     91400   17.9500 -112.3500       9.3        56       103        60
OIR    2025250     91400   17.9500 -112.3600       8.6        59       104        60
OIR    2025250     91400   17.9500 -112.3700       7.9        66       107        60
OIR    2025250     91400   17.9500 -112.3800       6.4        73       109        60
OIR    2025250     91400   17.9500 -112.3900       6.3        81       105        60
OIR    2025250     91400   17.9500 -112.4000       6.4        87       104        60
OIR    2025250     91400   17.9500 -112.4100       6.2        91       103        60
OIR    2025250     91400   17.9500 -112.4200       5.3        99       103        60
OIR    2025250     91400   17.9500 -112.4300       5.2       103       103        60
OIR    2025250     91400   17.9500 -112.4400       5.2       105       103        60
OIR    2025250     91400   17.9500 -112.4500       5.3       108       103        60
OIR    2025250     91400   17.9500 -112.4600       5.5       110       103        60
OIR    2025250     91400   17.9500 -112.4700       5.7       111       103        60
OIR    2025250     91400   17.9500 -112.4800       5.8       111       104        60
OIR    2025250     91400   17.9500 -112.4900       5.8       112       104        60
OIR    2025250     91400   17.9500 -112.5000       6.0       112       105        60
OIR    2025250     91400   17.9500 -112.5100       6.1       111       107        60
OIR    2025250     91400   17.9500 -112.5200       6.1       109       109        60
OIR    2025250     91400   17.9500 -112.5300       5.9       107       110        60
OIR    2025250     91400   17.9500 -112.5400       5.6       105       112        60
OIR    2025250     91400   17.9500 -112.5500       5.2       103       112        60
OIR    2025250     91400   17.9500 -112.5600       4.8       103       113        60
OIR    2025250     91400   17.9500 -112.5700       4.5       105       114        60
OIR    2025250     91400   17.9500 -113.5000       4.0        26       143        60
OIR    2025250     91400   17.9500 -113.6000       4.0        23       128        60
OIR    2025250     91400   17.9500 -113.6100       4.7        23       130        60
OIR    2025250     91400   17.9500 -113.6200       5.4        20       131        60
OIR    2025250     91400   17.9500 -113.6300       5.7        17       131        60
OIR    2025250     91400   17.9500 -113.6400       5.8        13       131        60
OIR    2025250     91400   17.9500 -113.6500       5.7         0       130        60
OIR    2025250     91400   17.9500 -113.6600       5.8       340       129        60
OIR    2025250     91400   17.9500 -113.6700       5.8       337       129        60
OIR    2025250     91400   17.9500 -113.6800       5.8       337       129        60
OIR    2025250     91400   17.9500 -113.6900       5.8       337       131        60
OIR    2025250     91400   17.9500 -113.7000       5.7       337       135        60
OIR    2025250     91400   17.9500 -113.7100       5.6       337       138        60
OIR    2025250     91400   17.9500 -113.7200       5.4       338       135        60
OIR    2025250     91400   17.9500 -113.7300       4.9       336       131        60
OIR    2025250     91400   17.9500 -113.7400       4.5       322       132        60
OIR    2025250     91400   17.9500 -113.7500       4.5       323       132        60
OIR    2025250     91400   17.9500 -113.7600       4.5       326       135        60
OIR    2025250     91400   17.9500 -113.7700       4.5       327       143        60
OIR    2025250     91400   17.9500 -113.8300       5.1         9       142        60
OIR    2025250     91400   17.9500 -113.8400       5.1        10       137        60
OIR    2025250     91400   17.9500 -113.8500       5.1        12       135        60
OIR    2025250     91400   17.9500 -113.8600       5.0        13       134        60
OIR    2025250     91400   17.9500 -113.8700       5.0        13       134        60
OIR    2025250     91400   17.9500 -113.8800       4.9        14       134        60
OIR    2025250     91400   17.9500 -113.8900       4.8        15       134        60
OIR    2025250     91400   17.9500 -113.9000       4.6        16       134        60
OIR    2025250     91400   17.9500 -113.9100       4.3        18       133        60
OIR    2025250     91400   17.9500 -113.9200       4.1        18       133        60
OIR    2025250     91400   17.9400 -110.4300      14.8        51       143        60
OIR    2025250     91400   17.9400 -110.4400      15.1        51       141        60
OIR    2025250     91400   17.9400 -110.4500      15.3        52       139        60
OIR    2025250     91400   17.9400 -110.4600      15.7        52       138        60
OIR    2025250     91400   17.9400 -110.4700      15.9        53       136        60
OIR    2025250     91400   17.9400 -110.4800      16.1        53       135        60
OIR    2025250     91400   17.9400 -110.4900      16.1        53       134        60
OIR    2025250     91400   17.9400 -110.5000      16.2        53       133        60
OIR    2025250     91400   17.9400 -110.5100      16.2        53       132        60
OIR    2025250     91400   17.9400 -110.5200      16.2        54       132        60
OIR    2025250     91400   17.9400 -110.5300      16.2        54       132        60
OIR    2025250     91400   17.9400 -110.5400      16.2        54       131        60
OIR    2025250     91400   17.9400 -110.5500      16.2        54       131        60
OIR    2025250     91400   17.9400 -110.5600      16.2        54       130        60
OIR    2025250     91400   17.9400 -110.5700      16.2        54       129        60
OIR    2025250     91400   17.9400 -110.5800      16.2        54       129        60
OIR    2025250     91400   17.9400 -110.5900      16.2        54       128        60
OIR    2025250     91400   17.9400 -110.6000      16.2        54       127        60
OIR    2025250     91400   17.9400 -110.6100      16.2        54       124        60
OIR    2025250     91400   17.9400 -110.6200      16.2        54       121        60
OIR    2025250     91400   17.9400 -110.6300      16.2        54       123        60
OIR    2025250     91400   17.9400 -110.6400      16.2        54       125        60
OIR    2025250     91400   17.9400 -110.6500      16.2        54       125        60
OIR    2025250     91400   17.9400 -110.6600      16.2        54       125        60
OIR    2025250     91400   17.9400 -110.6700      16.2        54       126        60
OIR    2025250     91400   17.9400 -110.6800      16.2        55       126        60
OIR    2025250     91400   17.9400 -110.6900      16.2        55       127        60
OIR    2025250     91400   17.9400 -110.7000      16.2        55       130        60
OIR    2025250     91400   17.9400 -110.7100      16.2        55       134        60
OIR    2025250     91400   17.9400 -110.7200      16.2        55       138        60
OIR    2025250     91400   17.9400 -110.8000      16.2        55       142        60
OIR    2025250     91400   17.9400 -110.8100      16.3        55       136        60
OIR    2025250     91400   17.9400 -110.8200      16.3        55       132        60
OIR    2025250     91400   17.9400 -110.8300      16.3        55       129        60
OIR    2025250     91400   17.9400 -110.8400      16.4        55       131        60
OIR    2025250     91400   17.9400 -110.8500      16.5        55       136        60
OIR    2025250     91400   17.9400 -110.8600      16.6        55       139        60
OIR    2025250     91400   17.9400 -110.8700      16.7        55       140        60
OIR    2025250     91400   17.9400 -110.8800      16.7        55       142        60
OIR    2025250     91400   17.9400 -110.8900      16.7        56       144        60
OIR    2025250     91400   17.9400 -111.0800      17.7        61       142        60
OIR    2025250     91400   17.9400 -111.0900      17.4        62       137        60
OIR    2025250     91400   17.9400 -111.1000      16.8        63       135        60
OIR    2025250     91400   17.9400 -111.1100      15.7        64       136        60
OIR    2025250     91400   17.9400 -111.1200      15.6        63       138        60
OIR    2025250     91400   17.9400 -111.1300      16.0        62       141        60
OIR    2025250     91400   17.9400 -111.4300      17.5        59       142        60
OIR    2025250     91400   17.9400 -111.4400      17.4        59       137        60
OIR    2025250     91400   17.9400 -111.4500      17.1        60       134        60
OIR    2025250     91400   17.9400 -111.4600      16.4        62       132        60
OIR    2025250     91400   17.9400 -111.4700      15.2        67       131        60
OIR    2025250     91400   17.9400 -111.4800      14.5        71       130        60
OIR    2025250     91400   17.9400 -111.4900      14.4        71       130        60
OIR    2025250     91400   17.9400 -111.5000      14.3        71       132        60
OIR    2025250     91400   17.9400 -111.5100      14.3        71       135        60
OIR    2025250     91400   17.9400 -111.5200      14.3        71       135        60
OIR    2025250     91400   17.9400 -111.5300      14.3        71       134        60
OIR    2025250     91400   17.9400 -111.5400      14.3        71       133        60
OIR    2025250     91400   17.9400 -111.5500      14.2        71       129        60
OIR    2025250     91400   17.9400 -111.5600      14.1        71       124        60
OIR    2025250     91400   17.9400 -111.5700      13.9        70       120        60
OIR    2025250     91400   17.9400 -111.5800      13.7        70       116        60
OIR    2025250     91400   17.9400 -111.5900      13.6        69       114        60
OIR    2025250     91400   17.9400 -111.6000      13.3        68       112        60
OIR    2025250     91400   17.9400 -111.6100      13.0        67       111        60
OIR    2025250     91400   17.9400 -111.6200      12.8        67       113        60
OIR    2025250     91400   17.9400 -111.6300      12.7        67       116        60
OIR    2025250     91400   17.9400 -111.6400      12.5        67       119        60
OIR    2025250     91400   17.9400 -111.6500      12.3        66       121        60
OIR    2025250     91400   17.9400 -111.6600      12.2        66       123        60
OIR    2025250     91400   17.9400 -111.6700      12.1        65       125        60
OIR    2025250     91400   17.9400 -111.6800      12.1        65       127        60
OIR    2025250     91400   17.9400 -111.6900      12.0        65       129        60
OIR    2025250     91400   17.9400 -111.7000      11.9        65       130        60
OIR    2025250     91400   17.9400 -111.7100      11.8        65       130        60
OIR    2025250     91400   17.9400 -111.7200      11.8        64       129        60
OIR    2025250     91400   17.9400 -111.7300      11.7        64       129        60
OIR    2025250     91400   17.9400 -111.7400      11.6        64       129        60
OIR    2025250     91400   17.9400 -111.7500      11.4        64       130        60
OIR    2025250     91400   17.9400 -111.7600      11.4        64       129        60
OIR    2025250     91400   17.9400 -111.7700      11.4        64       129        60
OIR    2025250     91400   17.9400 -111.7800      11.4        64       128        60
OIR    2025250     91400   17.9400 -111.7900      11.4        64       126        60
OIR    2025250     91400   17.9400 -111.8000      11.4        64       125        60
OIR    2025250     91400   17.9400 -111.8100      11.4        64       123        60
OIR    2025250     91400   17.9400 -111.8200      11.5        63       122        60
OIR    2025250     91400   17.9400 -111.8300      11.7        63       124        60
OIR    2025250     91400   17.9400 -111.8400      11.9        62       125        60
OIR    2025250     91400   17.9400 -111.8500      12.1        61       126        60
OIR    2025250     91400   17.9400 -111.8600      12.5        60       127        60
OIR    2025250     91400   17.9400 -111.8700      12.7        59       127        60
OIR    2025250     91400   17.9400 -111.8800      12.8        59       126        60
OIR    2025250     91400   17.9400 -111.8900      12.9        58       126        60
OIR    2025250     91400   17.9400 -111.9000      13.0        58       126        60
OIR    2025250     91400   17.9400 -111.9100      13.0        58       127        60
OIR    2025250     91400   17.9400 -111.9200      13.1        58       127        60
OIR    2025250     91400   17.9400 -111.9300      13.1        58       127        60
OIR    2025250     91400   17.9400 -111.9400      13.1        58       126        60
OIR    2025250     91400   17.9400 -111.9500      13.1        58       124        60
OIR    2025250     91400   17.9400 -111.9600      13.1        58       123        60
OIR    2025250     91400   17.9400 -111.9700      13.1        58       122        60
OIR    2025250     91400   17.9400 -111.9800      13.1        58       121        60
OIR    2025250     91400   17.9400 -111.9900      13.1        58       120        60
OIR    2025250     91400   17.9400 -112.0000      13.1        58       117        60
OIR    2025250     91400   17.9400 -112.0100      13.1        58       116        60
OIR    2025250     91400   17.9400 -112.0200      13.0        58       114        60
OIR    2025250     91400   17.9400 -112.0300      13.0        58       112        60
OIR    2025250     91400   17.9400 -112.0400      12.9        59       109        60
OIR    2025250     91400   17.9400 -112.0500      11.9        66       104        60
OIR    2025250     91400   17.9400 -112.0600      11.0        72       104        60
OIR    2025250     91400   17.9400 -112.0700      10.9        75       104        60
OIR    2025250     91400   17.9400 -112.0800      10.9        76       103        60
OIR    2025250     91400   17.9400 -112.0900      10.8        77       103        60
OIR    2025250     91400   17.9400 -112.1000      10.8        77       103        60
OIR    2025250     91400   17.9400 -112.1100      10.8        77       103        60
OIR    2025250     91400   17.9400 -112.1200      10.8        77       103        60
OIR    2025250     91400   17.9400 -112.1300      10.8        77       103        60
OIR    2025250     91400   17.9400 -112.1400      10.7        76       103        60
OIR    2025250     91400   17.9400 -112.1500      10.7        76       103        60
OIR    2025250     91400   17.9400 -112.1600      10.6        75       104        60
OIR    2025250     91400   17.9400 -112.1700      10.4        73       104        60
OIR    2025250     91400   17.9400 -112.1800      10.2        72       107        60
OIR    2025250     91400   17.9400 -112.1900      10.1        72       110        60
OIR    2025250     91400   17.9400 -112.2000       9.2        70       112        60
OIR    2025250     91400   17.9400 -112.2100       9.2        70       111        60
OIR    2025250     91400   17.9400 -112.2200       7.2        16       110        60
OIR    2025250     91400   17.9400 -112.2300      39.2       312       107        60
OIR    2025250     91400   17.9400 -112.2400      62.2       304       103        60
OIR    2025250     91400   17.9400 -112.2500      63.1       331       103        60
OIR    2025250     91400   17.9400 -112.2600      62.8        26       103        60
OIR    2025250     91400   17.9400 -112.2700      62.8        46       103        60
OIR    2025250     91400   17.9400 -112.2800      48.8        56       104        60
OIR    2025250     91400   17.9400 -112.2900      32.9        65       104        60
OIR    2025250     91400   17.9400 -112.3000      22.1        66       104        60
OIR    2025250     91400   17.9400 -112.3100      18.3        65       104        60
OIR    2025250     91400   17.9400 -112.3200      15.4        63       104        60
OIR    2025250     91400   17.9400 -112.3300      13.7        62       103        60
OIR    2025250     91400   17.9400 -112.3400       9.2        51       103        60
OIR    2025250     91400   17.9400 -112.3500       8.3        51       103        60
OIR    2025250     91400   17.9400 -112.3600       7.8        54       104        60
OIR    2025250     91400   17.9400 -112.3700       7.0        59       105        60
OIR    2025250     91400   17.9400 -112.3800       5.8        68       109        60
OIR    2025250     91400   17.9400 -112.3900       5.8        76       107        60
OIR    2025250     91400   17.9400 -112.4000       5.8        82       104        60
OIR    2025250     91400   17.9400 -112.4100       5.6        87       103        60
OIR    2025250     91400   17.9400 -112.4200       4.9        96       103        60
OIR    2025250     91400   17.9400 -112.4300       4.8       100       103        60
OIR    2025250     91400   17.9400 -112.4400       4.8       101       103        60
OIR    2025250     91400   17.9400 -112.4500       4.9       102       103        60
OIR    2025250     91400   17.9400 -112.4600       5.0       103       103        60
OIR    2025250     91400   17.9400 -112.4700       5.1       102       103        60
OIR    2025250     91400   17.9400 -112.4800       5.1       102       104        60
OIR    2025250     91400   17.9400 -112.4900       5.1       102       104        60
OIR    2025250     91400   17.9400 -112.5000       5.2       102       105        60
OIR    2025250     91400   17.9400 -112.5100       5.3       102       105        60
OIR    2025250     91400   17.9400 -112.5200       5.4       102       107        60
OIR    2025250     91400   17.9400 -112.5300       5.5       102       109        60
OIR    2025250     91400   17.9400 -112.5400       5.3       101       110        60
OIR    2025250     91400   17.9400 -112.5500       5.0       100       112        60
OIR    2025250     91400   17.9400 -112.5600       4.8        99       112        60
OIR    2025250     91400   17.9400 -112.5700       4.5        99       113        60
OIR    2025250     91400   17.9400 -113.2200       4.0       102       142        60
OIR    2025250     91400   17.9400 -113.6000       4.3        18       132        60
OIR    2025250     91400   17.9400 -113.6100       5.3        15       133        60
OIR    2025250     91400   17.9400 -113.6200       5.8        13       134        60
OIR    2025250     91400   17.9400 -113.6300       5.9        11       133        60
OIR    2025250     91400   17.9400 -113.6400       5.9         7       133        60
OIR    2025250     91400   17.9400 -113.6500       5.7       358       130        60
OIR    2025250     91400   17.9400 -113.6600       5.8       337       126        60
OIR    2025250     91400   17.9400 -113.6700       5.8       337       125        60
OIR    2025250     91400   17.9400 -113.6800       5.8       337       129        60
OIR    2025250     91400   17.9400 -113.6900       5.8       337       134        60
OIR    2025250     91400   17.9400 -113.7000       5.7       337       137        60
OIR    2025250     91400   17.9400 -113.7100       5.7       337       140        60
OIR    2025250     91400   17.9400 -113.7200       5.6       337       136        60
OIR    2025250     91400   17.9400 -113.7300       5.3       337       132        60
OIR    2025250     91400   17.9400 -113.7400       4.8       326       131        60
OIR    2025250     91400   17.9400 -113.7500       4.8       325       133        60
OIR    2025250     91400   17.9400 -113.7600       4.8       327       136        60
OIR    2025250     91400   17.9400 -113.7700       4.9       330       142        60
OIR    2025250     91400   17.9400 -113.8300       5.4         9       143        60
OIR    2025250     91400   17.9400 -113.8400       5.3        10       140        60
OIR    2025250     91400   17.9400 -113.8500       5.3        12       138        60
OIR    2025250     91400   17.9400 -113.8600       5.3        13       137        60
OIR    2025250     91400   17.9400 -113.8700       5.2        14       136        60
OIR    2025250     91400   17.9400 -113.8800       5.1        15       135        60
OIR    2025250     91400   17.9400 -113.8900       5.0        15       135        60
OIR    2025250     91400   17.9400 -113.9000       4.8        17       134        60
OIR    2025250     91400   17.9400 -113.9100       4.4        18       133        60
OIR    2025250     91400   17.9400 -113.9200       4.2        19       133        60
OIR    2025250     91400   17.9400 -113.9300       4.0        19       133        60
OIR    2025250     91400   17.9300 -110.4400      15.1        51       143        60
OIR    2025250     91400   17.9300 -110.4500      15.3        52       141        60
OIR    2025250     91400   17.9300 -110.4600      15.7        52       139        60
OIR    2025250     91400   17.9300 -110.4700      16.0        53       138        60
OIR    2025250     91400   17.9300 -110.4800      16.1        53       136        60
OIR    2025250     91400   17.9300 -110.4900      16.2        53       134        60
OIR    2025250     91400   17.9300 -110.5000      16.2        53       132        60
OIR    2025250     91400   17.9300 -110.5100      16.2        53       131        60
OIR    2025250     91400   17.9300 -110.5200      16.2        54       131        60
OIR    2025250     91400   17.9300 -110.5300      16.2        54       131        60
OIR    2025250     91400   17.9300 -110.5400      16.2        54       131        60
OIR    2025250     91400   17.9300 -110.5500      16.2        54       130        60
OIR    2025250     91400   17.9300 -110.5600      16.2        54       130        60
OIR    2025250     91400   17.9300 -110.5700      16.2        54       129        60
OIR    2025250     91400   17.9300 -110.5800      16.2        54       128        60
OIR    2025250     91400   17.9300 -110.5900      16.2        54       127        60
OIR    2025250     91400   17.9300 -110.6000      16.2        54       127        60
OIR    2025250     91400   17.9300 -110.6100      16.2        54       126        60
OIR    2025250     91400   17.9300 -110.6200      16.2        54       125        60
OIR    2025250     91400   17.9300 -110.6300      16.2        54       126        60
OIR    2025250     91400   17.9300 -110.6400      16.2        54       126        60
OIR    2025250     91400   17.9300 -110.6500      16.2        54       126        60
OIR    2025250     91400   17.9300 -110.6600      16.2        54       126        60
OIR    2025250     91400   17.9300 -110.6700      16.2        54       125        60
OIR    2025250     91400   17.9300 -110.6800      16.2        55       123        60
OIR    2025250     91400   17.9300 -110.6900      16.2        55       121        60
OIR    2025250     91400   17.9300 -110.7000      16.2        55       124        60
OIR    2025250     91400   17.9300 -110.7100      16.2        55       129        60
OIR    2025250     91400   17.9300 -110.7200      16.2        55       135        60
OIR    2025250     91400   17.9300 -110.7300      16.2        55       140        60
OIR    2025250     91400   17.9300 -110.8100      16.2        55       142        60
OIR    2025250     91400   17.9300 -110.8200      16.3        55       138        60
OIR    2025250     91400   17.9300 -110.8300      16.3        55       135        60
OIR    2025250     91400   17.9300 -110.8400      16.4        55       133        60
OIR    2025250     91400   17.9300 -110.8500      16.4        55       133        60
OIR    2025250     91400   17.9300 -110.8600      16.5        55       135        60
OIR    2025250     91400   17.9300 -110.8700      16.6        54       139        60
OIR    2025250     91400   17.9300 -111.0800      17.2        61       143        60
OIR    2025250     91400   17.9300 -111.0900      16.6        62       136        60
OIR    2025250     91400   17.9300 -111.1000      15.7        64       132        60
OIR    2025250     91400   17.9300 -111.1100      14.6        66       136        60
OIR    2025250     91400   17.9300 -111.1200      14.5        66       139        60
OIR    2025250     91400   17.9300 -111.1300      15.1        66       142        60
OIR    2025250     91400   17.9300 -111.4400      17.7        59       142        60
OIR    2025250     91400   17.9300 -111.4500      17.5        59       138        60
OIR    2025250     91400   17.9300 -111.4600      17.1        60       135        60
OIR    2025250     91400   17.9300 -111.4700      15.6        67       133        60
OIR    2025250     91400   17.9300 -111.4800      14.6        70       133        60
OIR    2025250     91400   17.9300 -111.4900      14.4        71       135        60
OIR    2025250     91400   17.9300 -111.5000      14.3        71       136        60
OIR    2025250     91400   17.9300 -111.5100      14.3        71       136        60
OIR    2025250     91400   17.9300 -111.5200      14.3        71       136        60
OIR    2025250     91400   17.9300 -111.5300      14.3        71       135        60
OIR    2025250     91400   17.9300 -111.5400      14.3        71       133        60
OIR    2025250     91400   17.9300 -111.5500      14.2        71       128        60
OIR    2025250     91400   17.9300 -111.5600      14.1        70       122        60
OIR    2025250     91400   17.9300 -111.5700      13.9        70       117        60
OIR    2025250     91400   17.9300 -111.5800      13.7        69       115        60
OIR    2025250     91400   17.9300 -111.5900      13.6        68       113        60
OIR    2025250     91400   17.9300 -111.6000      13.3        68       113        60
OIR    2025250     91400   17.9300 -111.6100      13.1        67       113        60
OIR    2025250     91400   17.9300 -111.6200      12.9        67       115        60
OIR    2025250     91400   17.9300 -111.6300      12.8        67       117        60
OIR    2025250     91400   17.9300 -111.6400      12.6        67       121        60
OIR    2025250     91400   17.9300 -111.6500      12.4        66       122        60
OIR    2025250     91400   17.9300 -111.6600      12.3        65       124        60
OIR    2025250     91400   17.9300 -111.6700      12.2        65       126        60
OIR    2025250     91400   17.9300 -111.6800      12.2        65       129        60
OIR    2025250     91400   17.9300 -111.6900      12.1        65       130        60
OIR    2025250     91400   17.9300 -111.7000      12.1        64       132        60
OIR    2025250     91400   17.9300 -111.7100      12.0        64       132        60
OIR    2025250     91400   17.9300 -111.7200      12.0        64       131        60
OIR    2025250     91400   17.9300 -111.7300      11.9        64       129        60
OIR    2025250     91400   17.9300 -111.7400      11.7        64       130        60
OIR    2025250     91400   17.9300 -111.7500      11.6        63       131        60
OIR    2025250     91400   17.9300 -111.7600      11.5        63       131        60
OIR    2025250     91400   17.9300 -111.7700      11.4        63       130        60
OIR    2025250     91400   17.9300 -111.7800      11.4        63       129        60
OIR    2025250     91400   17.9300 -111.7900      11.4        63       128        60
OIR    2025250     91400   17.9300 -111.8000      11.4        63       127        60
OIR    2025250     91400   17.9300 -111.8100      11.5        63       128        60
OIR    2025250     91400   17.9300 -111.8200      11.6        63       128        60
OIR    2025250     91400   17.9300 -111.8300      11.8        63       128        60
OIR    2025250     91400   17.9300 -111.8400      12.2        61       128        60
OIR    2025250     91400   17.9300 -111.8500      12.5        60       128        60
OIR    2025250     91400   17.9300 -111.8600      12.7        59       127        60
OIR    2025250     91400   17.9300 -111.8700      12.9        59       127        60
OIR    2025250     91400   17.9300 -111.8800      13.0        58       126        60
OIR    2025250     91400   17.9300 -111.8900      13.0        58       125        60
OIR    2025250     91400   17.9300 -111.9000      13.1        58       126        60
OIR    2025250     91400   17.9300 -111.9100      13.1        58       127        60
OIR    2025250     91400   17.9300 -111.9200      13.1        58       128        60
OIR    2025250     91400   17.9300 -111.9300      13.1        58       128        60
OIR    2025250     91400   17.9300 -111.9400      13.1        58       128        60
OIR    2025250     91400   17.9300 -111.9500      13.1        58       126        60
OIR    2025250     91400   17.9300 -111.9600      13.1        58       124        60
OIR    2025250     91400   17.9300 -111.9700      13.1        58       123        60
OIR    2025250     91400   17.9300 -111.9800      13.1        58       123        60
OIR    2025250     91400   17.9300 -111.9900      13.1        58       122        60
OIR    2025250     91400   17.9300 -112.0000      13.1        58       122        60
OIR    2025250     91400   17.9300 -112.0100      13.1        58       121        60
OIR    2025250     91400   17.9300 -112.0200      13.1        58       119        60
OIR    2025250     91400   17.9300 -112.0300      13.0        58       116        60
OIR    2025250     91400   17.9300 -112.0400      13.0        58       113        60
OIR    2025250     91400   17.9300 -112.0500      12.5        61       109        60
OIR    2025250     91400   17.9300 -112.0600      11.6        68       107        60
OIR    2025250     91400   17.9300 -112.0700      11.1        73       105        60
OIR    2025250     91400   17.9300 -112.0800      10.9        75       105        60
OIR    2025250     91400   17.9300 -112.0900      10.8        76       104        60
OIR    2025250     91400   17.9300 -112.1000      10.8        76       103        60
OIR    2025250     91400   17.9300 -112.1100      10.8        76       104        60
OIR    2025250     91400   17.9300 -112.1200      10.8        76       104        60
OIR    2025250     91400   17.9300 -112.1300      10.8        76       104        60
OIR    2025250     91400   17.9300 -112.1400      10.7        76       105        60
OIR    2025250     91400   17.9300 -112.1500      10.7        75       107        60
OIR    2025250     91400   17.9300 -112.1600      10.4        73       108        60
OIR    2025250     91400   17.9300 -112.1700      10.3        72       108        60
OIR    2025250     91400   17.9300 -112.1800      10.2        72       111        60
OIR    2025250     91400   17.9300 -112.1900       9.9        71       114        60
OIR    2025250     91400   17.9300 -112.2000       8.8        68       115        60
OIR    2025250     91400   17.9300 -112.2100       8.7        69       114        60
OIR    2025250     91400   17.9300 -112.2200       7.7       333       113        60
OIR    2025250     91400   17.9300 -112.2300      44.7       289       108        60
OIR    2025250     91400   17.9300 -112.2500      16.4       190       103        60
OIR    2025250     91400   17.9300 -112.2600      14.0       189       103        60
OIR    2025250     91400   17.9300 -112.2700      66.9        66       103        60
OIR    2025250     91400   17.9300 -112.2800      65.0        73       103        60
OIR    2025250     91400   17.9300 -112.2900      47.1        73       103        60
OIR    2025250     91400   17.9300 -112.3000      21.9        69       103        60
OIR    2025250     91400   17.9300 -112.3100      18.5        66       103        60
OIR    2025250     91400   17.9300 -112.3200      14.9        62       103        60
OIR    2025250     91400   17.9300 -112.3300      11.1        55       103        60
OIR    2025250     91400   17.9300 -112.3400       8.4        46       103        60
OIR    2025250     91400   17.9300 -112.3500       8.1        46       103        60
OIR    2025250     91400   17.9300 -112.3600       7.5        47       104        60
OIR    2025250     91400   17.9300 -112.3700       6.5        52       105        60
OIR    2025250     91400   17.9300 -112.3800       5.6        62       108        60
OIR    2025250     91400   17.9300 -112.3900       5.4        72       107        60
OIR    2025250     91400   17.9300 -112.4000       5.4        78       104        60
OIR    2025250     91400   17.9300 -112.4100       5.2        83       103        60
OIR    2025250     91400   17.9300 -112.4200       4.7        92       103        60
OIR    2025250     91400   17.9300 -112.4300       4.7        97       103        60
OIR    2025250     91400   17.9300 -112.4400       4.7        99       103        60
OIR    2025250     91400   17.9300 -112.4500       4.8       100       103        60
OIR    2025250     91400   17.9300 -112.4600       4.9       100       103        60
OIR    2025250     91400   17.9300 -112.4700       4.9       100       103        60
OIR    2025250     91400   17.9300 -112.4800       5.0       100       104        60
OIR    2025250     91400   17.9300 -112.4900       5.0       100       104        60
OIR    2025250     91400   17.9300 -112.5000       5.1        99       105        60
OIR    2025250     91400   17.9300 -112.5100       5.2        99       104        60
OIR    2025250     91400   17.9300 -112.5200       5.3        99       104        60
OIR    2025250     91400   17.9300 -112.5300       5.3        98       107        60
OIR    2025250     91400   17.9300 -112.5400       5.2        97       109        60
OIR    2025250     91400   17.9300 -112.5500       4.9        95       110        60
OIR    2025250     91400   17.9300 -112.5600       4.7        94       111        60
OIR    2025250     91400   17.9300 -112.5700       4.4        93       112        60
OIR    2025250     91400   17.9300 -113.2200       4.0       103       137        60
OIR    2025250     91400   17.9300 -113.2300       4.1       104       139        60
OIR    2025250     91400   17.9300 -113.2400       4.1       104       141        60
OIR    2025250     91400   17.9300 -113.2500       4.2       103       142        60
OIR    2025250     91400   17.9300 -113.5100       4.0        21       144        60
OIR    2025250     91400   17.9300 -113.5900       5.0         6       132        60
OIR    2025250     91400   17.9300 -113.6000       6.1         2       133        60
OIR    2025250     91400   17.9300 -113.6100       6.4         2       136        60
OIR    2025250     91400   17.9300 -113.6200       6.4         3       139        60
OIR    2025250     91400   17.9300 -113.6300       6.2         4       137        60
OIR    2025250     91400   17.9300 -113.6400       5.9         1       135        60
OIR    2025250     91400   17.9300 -113.6500       5.7       353       133        60
OIR    2025250     91400   17.9300 -113.6600       5.7       338       128        60
OIR    2025250     91400   17.9300 -113.6700       5.8       337       125        60
OIR    2025250     91400   17.9300 -113.6800       5.8       337       130        60
OIR    2025250     91400   17.9300 -113.6900       5.8       337       135        60
OIR    2025250     91400   17.9300 -113.7000       5.8       338       139        60
OIR    2025250     91400   17.9300 -113.7100       5.8       339       143        60
OIR    2025250     91400   17.9300 -113.7200       5.7       339       141        60
OIR    2025250     91400   17.9300 -113.7300       5.5       340       135        60
OIR    2025250     91400   17.9300 -113.7400       5.2       337       133        60
OIR    2025250     91400   17.9300 -113.7500       4.9       330       134        60
OIR    2025250     91400   17.9300 -113.7600       4.9       333       137        60
OIR    2025250     91400   17.9300 -113.7700       5.2       339       142        60
OIR    2025250     91400   17.9300 -113.8300       5.7         9       144        60
OIR    2025250     91400   17.9300 -113.8400       5.4        10       142        60
OIR    2025250     91400   17.9300 -113.8500       5.4        12       141        60
OIR    2025250     91400   17.9300 -113.8600       5.4        13       140        60
OIR    2025250     91400   17.9300 -113.8700       5.3        14       139        60
OIR    2025250     91400   17.9300 -113.8800       5.3        15       138        60
OIR    2025250     91400   17.9300 -113.8900       5.1        16       136        60
OIR    2025250     91400   17.9300 -113.9000       4.9        17       135        60
OIR    2025250     91400   17.9300 -113.9100       4.5        19       133        60
OIR    2025250     91400   17.9300 -113.9200       4.2        19       132        60
OIR    2025250     91400   17.9300 -113.9300       4.1        20       133        60
OIR    2025250     91400   17.9300 -113.9400       4.0        20       134        60
OIR    2025250     91400   17.9300 -114.1800       4.0       323       143        60
OIR    2025250     91400   17.9200 -110.4600      15.7        52       142        60
OIR    2025250     91400   17.9200 -110.4700      16.0        53       140        60
OIR    2025250     91400   17.9200 -110.4800      16.2        53       138        60
OIR    2025250     91400   17.9200 -110.4900      16.2        53       136        60
OIR    2025250     91400   17.9200 -110.5000      16.2        53       134        60
OIR    2025250     91400   17.9200 -110.5100      16.2        53       133        60
OIR    2025250     91400   17.9200 -110.5200      16.3        53       132        60
OIR    2025250     91400   17.9200 -110.5300      16.3        54       131        60
OIR    2025250     91400   17.9200 -110.5400      16.3        54       131        60
OIR    2025250     91400   17.9200 -110.5500      16.3        54       131        60
OIR    2025250     91400   17.9200 -110.5600      16.3        54       131        60
OIR    2025250     91400   17.9200 -110.5700      16.3        54       130        60
OIR    2025250     91400   17.9200 -110.5800      16.3        54       130        60
OIR    2025250     91400   17.9200 -110.5900      16.2        54       128        60
OIR    2025250     91400   17.9200 -110.6000      16.2        54       127        60
OIR    2025250     91400   17.9200 -110.6100      16.2        54       128        60
OIR    2025250     91400   17.9200 -110.6200      16.2        54       128        60
OIR    2025250     91400   17.9200 -110.6300      16.2        54       128        60
OIR    2025250     91400   17.9200 -110.6400      16.2        54       127        60
OIR    2025250     91400   17.9200 -110.6500      16.2        54       126        60
OIR    2025250     91400   17.9200 -110.6600      16.2        54       126        60
OIR    2025250     91400   17.9200 -110.6700      16.2        54       126        60
OIR    2025250     91400   17.9200 -110.6800      16.2        55       123        60
OIR    2025250     91400   17.9200 -110.6900      16.2        55       120        60
OIR    2025250     91400   17.9200 -110.7000      16.2        55       120        60
OIR    2025250     91400   17.9200 -110.7100      16.2        55       125        60
OIR    2025250     91400   17.9200 -110.7200      16.1        55       131        60
OIR    2025250     91400   17.9200 -110.7300      16.1        55       136        60
OIR    2025250     91400   17.9200 -110.7400      16.2        55       142        60
OIR    2025250     91400   17.9200 -110.8300      16.3        55       142        60
OIR    2025250     91400   17.9200 -110.8400      16.3        55       139        60
OIR    2025250     91400   17.9200 -110.8500      16.4        55       135        60
OIR    2025250     91400   17.9200 -110.8600      16.5        54       130        60
OIR    2025250     91400   17.9200 -110.8700      16.6        54       138        60
OIR    2025250     91400   17.9200 -111.0900      15.8        63       141        60
OIR    2025250     91400   17.9200 -111.1000      14.4        66       138        60
OIR    2025250     91400   17.9200 -111.1100      14.1        68       140        60
OIR    2025250     91400   17.9200 -111.1200      14.1        68       143        60
OIR    2025250     91400   17.9200 -111.4500      17.7        59       142        60
OIR    2025250     91400   17.9200 -111.4600      17.3        60       139        60
OIR    2025250     91400   17.9200 -111.4700      15.7        66       135        60
OIR    2025250     91400   17.9200 -111.4800      14.9        69       135        60
OIR    2025250     91400   17.9200 -111.4900      14.4        71       139        60
OIR    2025250     91400   17.9200 -111.5000      14.3        71       142        60
OIR    2025250     91400   17.9200 -111.5100      14.3        71       139        60
OIR    2025250     91400   17.9200 -111.5200      14.3        71       136        60
OIR    2025250     91400   17.9200 -111.5300      14.3        71       134        60
OIR    2025250     91400   17.9200 -111.5400      14.3        71       133        60
OIR    2025250     91400   17.9200 -111.5500      14.2        71       127        60
OIR    2025250     91400   17.9200 -111.5600      14.0        69       120        60
OIR    2025250     91400   17.9200 -111.5700      13.7        68       114        60
OIR    2025250     91400   17.9200 -111.5800      13.6        67       112        60
OIR    2025250     91400   17.9200 -111.5900      13.5        67       110        60
OIR    2025250     91400   17.9200 -111.6000      13.3        67       113        60
OIR    2025250     91400   17.9200 -111.6100      13.2        67       116        60
OIR    2025250     91400   17.9200 -111.6200      13.0        67       119        60
OIR    2025250     91400   17.9200 -111.6300      12.9        67       121        60
OIR    2025250     91400   17.9200 -111.6400      12.7        66       123        60
OIR    2025250     91400   17.9200 -111.6500      12.5        66       124        60
OIR    2025250     91400   17.9200 -111.6600      12.4        65       126        60
OIR    2025250     91400   17.9200 -111.6700      12.3        65       128        60
OIR    2025250     91400   17.9200 -111.6800      12.3        65       130        60
OIR    2025250     91400   17.9200 -111.6900      12.2        64       132        60
OIR    2025250     91400   17.9200 -111.7000      12.2        64       133        60
OIR    2025250     91400   17.9200 -111.7100      12.2        64       134        60
OIR    2025250     91400   17.9200 -111.7200      12.2        64       133        60
OIR    2025250     91400   17.9200 -111.7300      12.1        63       131        60
OIR    2025250     91400   17.9200 -111.7400      12.0        63       131        60
OIR    2025250     91400   17.9200 -111.7500      11.8        63       131        60
OIR    2025250     91400   17.9200 -111.7600      11.6        63       131        60
OIR    2025250     91400   17.9200 -111.7700      11.5        63       131        60
OIR    2025250     91400   17.9200 -111.7800      11.5        63       130        60
OIR    2025250     91400   17.9200 -111.7900      11.5        63       130        60
OIR    2025250     91400   17.9200 -111.8000      11.5        63       129        60
OIR    2025250     91400   17.9200 -111.8100      11.7        62       129        60
OIR    2025250     91400   17.9200 -111.8200      12.0        62       129        60
OIR    2025250     91400   17.9200 -111.8300      12.2        61       129        60
OIR    2025250     91400   17.9200 -111.8400      12.5        60       128        60
OIR    2025250     91400   17.9200 -111.8500      12.8        59       127        60
OIR    2025250     91400   17.9200 -111.8600      12.9        59       126        60
OIR    2025250     91400   17.9200 -111.8700      13.0        59       124        60
OIR    2025250     91400   17.9200 -111.8800      13.0        58       124        60
OIR    2025250     91400   17.9200 -111.8900      13.1        58       124        60
OIR    2025250     91400   17.9200 -111.9000      13.1        58       125        60
OIR    2025250     91400   17.9200 -111.9100      13.1        58       127        60
OIR    2025250     91400   17.9200 -111.9200      13.1        58       128        60
OIR    2025250     91400   17.9200 -111.9300      13.1        58       129        60
OIR    2025250     91400   17.9200 -111.9400      13.1        58       129        60
OIR    2025250     91400   17.9200 -111.9500      13.1        58       128        60
OIR    2025250     91400   17.9200 -111.9600      13.1        58       126        60
OIR    2025250     91400   17.9200 -111.9700      13.1        58       124        60
OIR    2025250     91400   17.9200 -111.9800      13.1        58       124        60
OIR    2025250     91400   17.9200 -111.9900      13.1        58       124        60
OIR    2025250     91400   17.9200 -112.0000      13.1        58       123        60
OIR    2025250     91400   17.9200 -112.0100      13.1        58       123        60
OIR    2025250     91400   17.9200 -112.0200      13.1        58       122        60
OIR    2025250     91400   17.9200 -112.0300      13.1        58       120        60
OIR    2025250     91400   17.9200 -112.0400      13.0        58       116        60
OIR    2025250     91400   17.9200 -112.0500      12.7        59       114        60
OIR    2025250     91400   17.9200 -112.0600      12.1        63       111        60
OIR    2025250     91400   17.9200 -112.0700      11.0        72       110        60
OIR    2025250     91400   17.9200 -112.0800      10.9        74       109        60
OIR    2025250     91400   17.9200 -112.0900      10.9        75       107        60
OIR    2025250     91400   17.9200 -112.1000      10.8        76       104        60
OIR    2025250     91400   17.9200 -112.1100      10.8        76       104        60
OIR    2025250     91400   17.9200 -112.1200      10.8        76       104        60
OIR    2025250     91400   17.9200 -112.1300      10.8        76       105        60
OIR    2025250     91400   17.9200 -112.1400      10.7        75       108        60
OIR    2025250     91400   17.9200 -112.1500      10.6        74       110        60
OIR    2025250     91400   17.9200 -112.1600      10.5        72       111        60
OIR    2025250     91400   17.9200 -112.1700      10.3        71       113        60
OIR    2025250     91400   17.9200 -112.1800      10.1        71       115        60
OIR    2025250     91400   17.9200 -112.1900       9.3        67       117        60
OIR    2025250     91400   17.9200 -112.2000       8.5        64       119        60
OIR    2025250     91400   17.9200 -112.2100       8.1        64       116        60
OIR    2025250     91400   17.9200 -112.2200       7.1       292       115        60
OIR    2025250     91400   17.9200 -112.2300      42.3       257       111        60
OIR    2025250     91400   17.9200 -112.2500       4.2       330       103        60
OIR    2025250     91400   17.9200 -112.2600       9.9       309       103        60
OIR    2025250     91400   17.9200 -112.2900      49.4        86       103        60
OIR    2025250     91400   17.9200 -112.3000      21.0        68       103        60
OIR    2025250     91400   17.9200 -112.3100      16.7        63       103        60
OIR    2025250     91400   17.9200 -112.3200      13.0        56       103        60
OIR    2025250     91400   17.9200 -112.3300       9.8        46       103        60
OIR    2025250     91400   17.9200 -112.3400       8.6        43       103        60
OIR    2025250     91400   17.9200 -112.3500       8.2        43       104        60
OIR    2025250     91400   17.9200 -112.3600       7.6        45       104        60
OIR    2025250     91400   17.9200 -112.3700       6.9        49       105        60
OIR    2025250     91400   17.9200 -112.3800       5.7        58       107        60
OIR    2025250     91400   17.9200 -112.3900       5.3        69       107        60
OIR    2025250     91400   17.9200 -112.4000       5.1        76       104        60
OIR    2025250     91400   17.9200 -112.4100       4.9        80       104        60
OIR    2025250     91400   17.9200 -112.4200       4.7        85       104        60
OIR    2025250     91400   17.9200 -112.4300       4.5        92       103        60
OIR    2025250     91400   17.9200 -112.4400       4.5        95       103        60
OIR    2025250     91400   17.9200 -112.4500       4.6        97       103        60
OIR    2025250     91400   17.9200 -112.4600       4.7        97       103        60
OIR    2025250     91400   17.9200 -112.4700       4.8        97       103        60
OIR    2025250     91400   17.9200 -112.4800       4.9        97       103        60
OIR    2025250     91400   17.9200 -112.4900       4.9        96       104        60
OIR    2025250     91400   17.9200 -112.5000       5.0        96       104        60
OIR    2025250     91400   17.9200 -112.5100       5.0        95       104        60
OIR    2025250     91400   17.9200 -112.5200       5.1        94       104        60
OIR    2025250     91400   17.9200 -112.5300       5.1        93       105        60
OIR    2025250     91400   17.9200 -112.5400       4.9        91       108        60
OIR    2025250     91400   17.9200 -112.5500       4.8        90       110        60
OIR    2025250     91400   17.9200 -112.5600       4.6        88       111        60
OIR    2025250     91400   17.9200 -112.5700       4.3        86       113        60
OIR    2025250     91400   17.9200 -113.2100       4.0       103       132        60
OIR    2025250     91400   17.9200 -113.2200       4.1       104       133        60
OIR    2025250     91400   17.9200 -113.2300       4.1       104       134        60
OIR    2025250     91400   17.9200 -113.2400       4.1       104       135        60
OIR    2025250     91400   17.9200 -113.2500       4.2       103       136        60
OIR    2025250     91400   17.9200 -113.2600       4.3       102       138        60
OIR    2025250     91400   17.9200 -113.2700       4.3       101       141        60
OIR    2025250     91400   17.9200 -113.5100       4.7        14       143        60
OIR    2025250     91400   17.9200 -113.5800       5.2         4       135        60
OIR    2025250     91400   17.9200 -113.5900       7.0       356       135        60
OIR    2025250     91400   17.9200 -113.6000       7.3       355       135        60
OIR    2025250     91400   17.9200 -113.6100       7.2       357       138        60
OIR    2025250     91400   17.9200 -113.6200       7.0       358       142        60
OIR    2025250     91400   17.9200 -113.6300       6.6       358       141        60
OIR    2025250     91400   17.9200 -113.6400       6.2       356       138        60
OIR    2025250     91400   17.9200 -113.6500       5.9       350       136        60
OIR    2025250     91400   17.9200 -113.6600       5.8       342       133        60
OIR    2025250     91400   17.9200 -113.6700       5.8       338       131        60
OIR    2025250     91400   17.9200 -113.6800       5.8       338       134        60
OIR    2025250     91400   17.9200 -113.6900       5.8       338       136        60
OIR    2025250     91400   17.9200 -113.7000       5.8       340       140        60
OIR    2025250     91400   17.9200 -113.7300       5.8       344       142        60
OIR    2025250     91400   17.9200 -113.7400       5.6       345       138        60
OIR    2025250     91400   17.9200 -113.7500       5.5       345       139        60
OIR    2025250     91400   17.9200 -113.7600       5.5       346       139        60
OIR    2025250     91400   17.9200 -113.7700       5.7       347       142        60
OIR    2025250     91400   17.9200 -113.8200       5.9         6       142        60
OIR    2025250     91400   17.9200 -113.8300       5.9         8       141        60
OIR    2025250     91400   17.9200 -113.8400       5.8        11       142        60
OIR    2025250     91400   17.9200 -113.8500       5.7        13       143        60
OIR    2025250     91400   17.9200 -113.8600       5.5        13       143        60
OIR    2025250     91400   17.9200 -113.8700       5.4        14       142        60
OIR    2025250     91400   17.9200 -113.8800       5.3        15       140        60
OIR    2025250     91400   17.9200 -113.8900       5.2        16       138        60
OIR    2025250     91400   17.9200 -113.9000       5.0        17       136        60
OIR    2025250     91400   17.9200 -113.9100       4.5        19       134        60
OIR    2025250     91400   17.9200 -113.9200       4.2        20       133        60
OIR    2025250     91400   17.9200 -113.9300       4.1        20       133        60
OIR    2025250     91400   17.9200 -113.9400       4.1        20       134        60
OIR    2025250     91400   17.9200 -113.9500       4.0        20       135        60
OIR    2025250     91400   17.9100 -110.4700      16.1        53       143        60
OIR    2025250     91400   17.9100 -110.4800      16.2        53       139        60
OIR    2025250     91400   17.9100 -110.4900      16.2        53       137        60
OIR    2025250     91400   17.9100 -110.5000      16.3        53       136        60
OIR    2025250     91400   17.9100 -110.5100      16.3        53       134        60
OIR    2025250     91400   17.9100 -110.5200      16.3        53       133        60
OIR    2025250     91400   17.9100 -110.5300      16.3        54       132        60
OIR    2025250     91400   17.9100 -110.5400      16.3        54       132        60
OIR    2025250     91400   17.9100 -110.5500      16.3        54       133        60
OIR    2025250     91400   17.9100 -110.5600      16.3        54       133        60
OIR    2025250     91400   17.9100 -110.5700      16.3        54       133        60
OIR    2025250     91400   17.9100 -110.5800      16.3        54       132        60
OIR    2025250     91400   17.9100 -110.5900      16.3        54       130        60
OIR    2025250     91400   17.9100 -110.6000      16.3        54       127        60
OIR    2025250     91400   17.9100 -110.6100      16.2        54       128        60
OIR    2025250     91400   17.9100 -110.6200      16.2        54       130        60
OIR    2025250     91400   17.9100 -110.6300      16.2        54       129        60
OIR    2025250     91400   17.9100 -110.6400      16.2        54       127        60
OIR    2025250     91400   17.9100 -110.6500      16.2        54       124        60
OIR    2025250     91400   17.9100 -110.6600      16.2        54       126        60
OIR    2025250     91400   17.9100 -110.6700      16.2        54       129        60
OIR    2025250     91400   17.9100 -110.6800      16.2        55       127        60
OIR    2025250     91400   17.9100 -110.6900      16.2        55       124        60
OIR    2025250     91400   17.9100 -110.7000      16.2        55       123        60
OIR    2025250     91400   17.9100 -110.7100      16.1        55       125        60
OIR    2025250     91400   17.9100 -110.7200      16.1        55       127        60
OIR    2025250     91400   17.9100 -110.7300      16.1        55       134        60
OIR    2025250     91400   17.9100 -110.7400      16.1        55       142        60
OIR    2025250     91400   17.9100 -110.8300      16.3        55       143        60
OIR    2025250     91400   17.9100 -110.8400      16.2        55       139        60
OIR    2025250     91400   17.9100 -110.8500      16.3        55       139        60
OIR    2025250     91400   17.9100 -110.8600      16.3        54       139        60
OIR    2025250     91400   17.9100 -110.8700      16.5        54       143        60
OIR    2025250     91400   17.9100 -111.4500      17.8        59       144        60
OIR    2025250     91400   17.9100 -111.4600      17.5        60       142        60
OIR    2025250     91400   17.9100 -111.4700      15.7        65       140        60
OIR    2025250     91400   17.9100 -111.4800      14.9        67       140        60
OIR    2025250     91400   17.9100 -111.4900      14.3        69       142        60
OIR    2025250     91400   17.9100 -111.5000      14.3        70       143        60
OIR    2025250     91400   17.9100 -111.5100      14.3        71       139        60
OIR    2025250     91400   17.9100 -111.5200      14.3        71       135        60
OIR    2025250     91400   17.9100 -111.5300      14.3        71       132        60
OIR    2025250     91400   17.9100 -111.5400      14.2        71       130        60
OIR    2025250     91400   17.9100 -111.5500      14.1        70       126        60
OIR    2025250     91400   17.9100 -111.5600      13.6        67       119        60
OIR    2025250     91400   17.9100 -111.5700      13.5        67       113        60
OIR    2025250     91400   17.9100 -111.5800      13.5        67       110        60
OIR    2025250     91400   17.9100 -111.5900      13.5        67       109        60
OIR    2025250     91400   17.9100 -111.6000      13.4        67       112        60
OIR    2025250     91400   17.9100 -111.6100      13.3        67       116        60
OIR    2025250     91400   17.9100 -111.6200      13.1        67       121        60
OIR    2025250     91400   17.9100 -111.6300      13.0        67       122        60
OIR    2025250     91400   17.9100 -111.6400      12.8        66       124        60
OIR    2025250     91400   17.9100 -111.6500      12.6        65       125        60
OIR    2025250     91400   17.9100 -111.6600      12.5        65       126        60
OIR    2025250     91400   17.9100 -111.6700      12.4        65       128        60
OIR    2025250     91400   17.9100 -111.6800      12.3        64       130        60
OIR    2025250     91400   17.9100 -111.6900      12.3        64       132        60
OIR    2025250     91400   17.9100 -111.7000      12.3        64       134        60
OIR    2025250     91400   17.9100 -111.7100      12.3        64       135        60
OIR    2025250     91400   17.9100 -111.7200      12.3        64       134        60
OIR    2025250     91400   17.9100 -111.7300      12.3        63       133        60
OIR    2025250     91400   17.9100 -111.7400      12.2        63       132        60
OIR    2025250     91400   17.9100 -111.7500      12.1        63       132        60
OIR    2025250     91400   17.9100 -111.7600      11.9        63       132        60
OIR    2025250     91400   17.9100 -111.7700      11.7        63       131        60
OIR    2025250     91400   17.9100 -111.7800      11.7        63       131        60
OIR    2025250     91400   17.9100 -111.7900      11.8        62       131        60
OIR    2025250     91400   17.9100 -111.8000      12.1        61       130        60
OIR    2025250     91400   17.9100 -111.8100      12.3        60       130        60
OIR    2025250     91400   17.9100 -111.8200      12.5        60       130        60
OIR    2025250     91400   17.9100 -111.8300      12.7        59       129        60
OIR    2025250     91400   17.9100 -111.8400      12.8        59       128        60
OIR    2025250     91400   17.9100 -111.8500      12.9        59       127        60
OIR    2025250     91400   17.9100 -111.8600      13.0        59       124        60
OIR    2025250     91400   17.9100 -111.8700      13.0        58       122        60
OIR    2025250     91400   17.9100 -111.8800      13.1        58       121        60
OIR    2025250     91400   17.9100 -111.8900      13.1        58       122        60
OIR    2025250     91400   17.9100 -111.9000      13.1        58       123        60
OIR    2025250     91400   17.9100 -111.9100      13.1        58       126        60
OIR    2025250     91400   17.9100 -111.9200      13.1        58       128        60
OIR    2025250     91400   17.9100 -111.9300      13.1        58       129        60
OIR    2025250     91400   17.9100 -111.9400      13.1        58       130        60
OIR    2025250     91400   17.9100 -111.9500      13.1        58       129        60
OIR    2025250     91400   17.9100 -111.9600      13.1        58       127        60
OIR    2025250     91400   17.9100 -111.9700      13.1        58       126        60
OIR    2025250     91400   17.9100 -111.9800      13.1        58       125        60
OIR    2025250     91400   17.9100 -111.9900      13.1        58       124        60
OIR    2025250     91400   17.9100 -112.0000      13.1        58       124        60
OIR    2025250     91400   17.9100 -112.0100      13.1        58       124        60
OIR    2025250     91400   17.9100 -112.0200      13.1        58       123        60
OIR    2025250     91400   17.9100 -112.0300      13.1        58       122        60
OIR    2025250     91400   17.9100 -112.0400      13.1        58       121        60
OIR    2025250     91400   17.9100 -112.0500      12.8        58       120        60
OIR    2025250     91400   17.9100 -112.0600      12.3        61       117        60
OIR    2025250     91400   17.9100 -112.0700      11.1        69       116        60
OIR    2025250     91400   17.9100 -112.0800      10.9        73       114        60
OIR    2025250     91400   17.9100 -112.0900      10.8        74       111        60
OIR    2025250     91400   17.9100 -112.1000      10.8        75       108        60
OIR    2025250     91400   17.9100 -112.1100      10.8        75       107        60
OIR    2025250     91400   17.9100 -112.1200      10.8        75       107        60
OIR    2025250     91400   17.9100 -112.1300      10.8        75       107        60
OIR    2025250     91400   17.9100 -112.1400      10.7        74       109        60
OIR    2025250     91400   17.9100 -112.1500      10.7        73       111        60
OIR    2025250     91400   17.9100 -112.1600      10.6        70       114        60
OIR    2025250     91400   17.9100 -112.1700      10.4        67       117        60
OIR    2025250     91400   17.9100 -112.1800       9.9        64       121        60
OIR    2025250     91400   17.9100 -112.1900       9.2        61       122        60
OIR    2025250     91400   17.9100 -112.2000       8.6        59       122        60
OIR    2025250     91400   17.9100 -112.2100       8.1        55       119        60
OIR    2025250     91400   17.9100 -112.2200       4.3        41       116        60
OIR    2025250     91400   17.9100 -112.2300      39.7       238       112        60
OIR    2025250     91400   17.9100 -112.2400      61.5       224       107        60
OIR    2025250     91400   17.9100 -112.2800      58.0       117       103        60
OIR    2025250     91400   17.9100 -112.2900      33.7        92       103        60
OIR    2025250     91400   17.9100 -112.3000      16.6        65       103        60
OIR    2025250     91400   17.9100 -112.3100      13.2        54       103        60
OIR    2025250     91400   17.9100 -112.3200      10.9        45       103        60
OIR    2025250     91400   17.9100 -112.3300       9.8        40       103        60
OIR    2025250     91400   17.9100 -112.3400       9.2        40       103        60
OIR    2025250     91400   17.9100 -112.3500       8.5        41       104        60
OIR    2025250     91400   17.9100 -112.3600       8.0        43       104        60
OIR    2025250     91400   17.9100 -112.3700       7.4        47       105        60
OIR    2025250     91400   17.9100 -112.3800       6.1        54       107        60
OIR    2025250     91400   17.9100 -112.3900       5.4        64       107        60
OIR    2025250     91400   17.9100 -112.4000       5.0        74       105        60
OIR    2025250     91400   17.9100 -112.4100       4.8        78       104        60
OIR    2025250     91400   17.9100 -112.4200       4.6        82       104        60
OIR    2025250     91400   17.9100 -112.4300       4.5        86       103        60
OIR    2025250     91400   17.9100 -112.4400       4.4        89       103        60
OIR    2025250     91400   17.9100 -112.4500       4.5        92       103        60
OIR    2025250     91400   17.9100 -112.4600       4.6        93       103        60
OIR    2025250     91400   17.9100 -112.4700       4.7        93       103        60
OIR    2025250     91400   17.9100 -112.4800       4.8        93       103        60
OIR    2025250     91400   17.9100 -112.4900       4.8        93       103        60
OIR    2025250     91400   17.9100 -112.5000       4.9        92       103        60
OIR    2025250     91400   17.9100 -112.5100       5.0        91       103        60
OIR    2025250     91400   17.9100 -112.5200       5.0        89       103        60
OIR    2025250     91400   17.9100 -112.5300       4.9        87       104        60
OIR    2025250     91400   17.9100 -112.5400       4.8        86       107        60
OIR    2025250     91400   17.9100 -112.5500       4.6        84       109        60
OIR    2025250     91400   17.9100 -112.5600       4.5        82       112        60
OIR    2025250     91400   17.9100 -112.5700       4.3        81       114        60
OIR    2025250     91400   17.9100 -113.2100       4.1       104       129        60
OIR    2025250     91400   17.9100 -113.2200       4.1       104       130        60
OIR    2025250     91400   17.9100 -113.2300       4.1       104       129        60
OIR    2025250     91400   17.9100 -113.2400       4.1       104       128        60
OIR    2025250     91400   17.9100 -113.2500       4.2       103       130        60
OIR    2025250     91400   17.9100 -113.2600       4.3       101       133        60
OIR    2025250     91400   17.9100 -113.2700       4.3       101       133        60
OIR    2025250     91400   17.9100 -113.2800       4.3       100       133        60
OIR    2025250     91400   17.9100 -113.2900       4.4        96       136        60
OIR    2025250     91400   17.9100 -113.3000       4.4        94       139        60
OIR    2025250     91400   17.9100 -113.3100       4.4        92       141        60
OIR    2025250     91400   17.9100 -113.3200       4.4        91       141        60
OIR    2025250     91400   17.9100 -113.3300       4.4        88       142        60
OIR    2025250     91400   17.9100 -113.3400       4.4        81       142        60
OIR    2025250     91400   17.9100 -113.3500       4.4        72       142        60
OIR    2025250     91400   17.9100 -113.5100       5.5         8       140        60
OIR    2025250     91400   17.9100 -113.5200       4.6        10       143        60
OIR    2025250     91400   17.9100 -113.5700       4.4         4       141        60
OIR    2025250     91400   17.9100 -113.5800       6.7       356       139        60
OIR    2025250     91400   17.9100 -113.5900       7.3       355       139        60
OIR    2025250     91400   17.9100 -113.6000       7.4       354       139        60
OIR    2025250     91400   17.9100 -113.6100       7.4       354       140        60
OIR    2025250     91400   17.9100 -113.6200       7.4       354       143        60
OIR    2025250     91400   17.9100 -113.6300       7.2       354       143        60
OIR    2025250     91400   17.9100 -113.6400       6.6       352       140        60
OIR    2025250     91400   17.9100 -113.6500       6.2       349       137        60
OIR    2025250     91400   17.9100 -113.6600       6.1       345       136        60
OIR    2025250     91400   17.9100 -113.6700       6.2       343       134        60
OIR    2025250     91400   17.9100 -113.6800       6.1       341       135        60
OIR    2025250     91400   17.9100 -113.6900       6.1       341       137        60
OIR    2025250     91400   17.9100 -113.7000       6.2       345       141        60
OIR    2025250     91400   17.9100 -113.7400       6.2       352       144        60
OIR    2025250     91400   17.9100 -113.7500       6.0       352       142        60
OIR    2025250     91400   17.9100 -113.7600       5.9       351       141        60
OIR    2025250     91400   17.9100 -113.7700       5.9       353       141        60
OIR    2025250     91400   17.9100 -113.7800       6.1       356       142        60
OIR    2025250     91400   17.9100 -113.7900       6.2         0       143        60
OIR    2025250     91400   17.9100 -113.8000       6.2         2       142        60
OIR    2025250     91400   17.9100 -113.8100       6.1         4       141        60
OIR    2025250     91400   17.9100 -113.8200       6.0         5       140        60
OIR    2025250     91400   17.9100 -113.8300       5.9         8       138        60
OIR    2025250     91400   17.9100 -113.8400       5.9        11       140        60
OIR    2025250     91400   17.9100 -113.8500       5.8        13       144        60
OIR    2025250     91400   17.9100 -113.8800       5.4        15       143        60
OIR    2025250     91400   17.9100 -113.8900       5.3        16       140        60
OIR    2025250     91400   17.9100 -113.9000       4.8        18       138        60
OIR    2025250     91400   17.9100 -113.9100       4.4        20       136        60
OIR    2025250     91400   17.9100 -113.9200       4.2        20       133        60
OIR    2025250     91400   17.9100 -113.9300       4.2        20       133        60
OIR    2025250     91400   17.9100 -113.9400       4.1        20       133        60
OIR    2025250     91400   17.9100 -113.9500       4.0        20       135        60
OIR    2025250     91400   17.9100 -113.9600       4.0        19       136        60
OIR    2025250     91400   17.9000 -110.4900      16.3        53       141        60
OIR    2025250     91400   17.9000 -110.5000      16.3        53       139        60
OIR    2025250     91400   17.9000 -110.5100      16.3        53       138        60
OIR    2025250     91400   17.9000 -110.5200      16.3        53       136        60
OIR    2025250     91400   17.9000 -110.5300      16.3        54       135        60
OIR    2025250     91400   17.9000 -110.5400      16.3        54       134        60
OIR    2025250     91400   17.9000 -110.5500      16.3        54       133        60
OIR    2025250     91400   17.9000 -110.5600      16.3        54       133        60
OIR    2025250     91400   17.9000 -110.5700      16.3        54       133        60
OIR    2025250     91400   17.9000 -110.5800      16.3        54       132        60
OIR    2025250     91400   17.9000 -110.5900      16.3        54       131        60
OIR    2025250     91400   17.9000 -110.6000      16.3        54       129        60
OIR    2025250     91400   17.9000 -110.6100      16.3        54       129        60
OIR    2025250     91400   17.9000 -110.6200      16.2        54       131        60
OIR    2025250     91400   17.9000 -110.6300      16.2        54       132        60
OIR    2025250     91400   17.9000 -110.6400      16.2        54       129        60
OIR    2025250     91400   17.9000 -110.6500      16.2        54       127        60
OIR    2025250     91400   17.9000 -110.6600      16.2        54       128        60
OIR    2025250     91400   17.9000 -110.6700      16.2        54       130        60
OIR    2025250     91400   17.9000 -110.6800      16.2        55       131        60
OIR    2025250     91400   17.9000 -110.6900      16.2        55       128        60
OIR    2025250     91400   17.9000 -110.7000      16.2        55       126        60
OIR    2025250     91400   17.9000 -110.7100      16.1        55       126        60
OIR    2025250     91400   17.9000 -110.7200      16.1        55       126        60
OIR    2025250     91400   17.9000 -110.7300      16.1        55       132        60
OIR    2025250     91400   17.9000 -110.7400      16.1        55       141        60
OIR    2025250     91400   17.9000 -110.8400      16.2        55       139        60
OIR    2025250     91400   17.9000 -110.8500      16.2        55       143        60
OIR    2025250     91400   17.9000 -111.5000      14.0        68       144        60
OIR    2025250     91400   17.9000 -111.5100      13.9        68       140        60
OIR    2025250     91400   17.9000 -111.5200      14.0        68       135        60
OIR    2025250     91400   17.9000 -111.5300      13.9        68       131        60
OIR    2025250     91400   17.9000 -111.5400      13.9        69       128        60
OIR    2025250     91400   17.9000 -111.5500      13.7        69       124        60
OIR    2025250     91400   17.9000 -111.5600      13.5        67       117        60
OIR    2025250     91400   17.9000 -111.5700      13.5        66       112        60
OIR    2025250     91400   17.9000 -111.5800      13.5        66       109        60
OIR    2025250     91400   17.9000 -111.5900      13.5        66       108        60
OIR    2025250     91400   17.9000 -111.6000      13.4        66       110        60
OIR    2025250     91400   17.9000 -111.6100      13.3        67       116        60
OIR    2025250     91400   17.9000 -111.6200      13.2        66       122        60
OIR    2025250     91400   17.9000 -111.6300      13.0        66       123        60
OIR    2025250     91400   17.9000 -111.6400      12.8        66       124        60
OIR    2025250     91400   17.9000 -111.6500      12.7        65       125        60
OIR    2025250     91400   17.9000 -111.6600      12.6        65       125        60
OIR    2025250     91400   17.9000 -111.6700      12.5        64       127        60
OIR    2025250     91400   17.9000 -111.6800      12.4        64       129        60
OIR    2025250     91400   17.9000 -111.6900      12.4        64       131        60
OIR    2025250     91400   17.9000 -111.7000      12.4        64       133        60
OIR    2025250     91400   17.9000 -111.7100      12.4        64       135        60
OIR    2025250     91400   17.9000 -111.7200      12.5        63       134        60
OIR    2025250     91400   17.9000 -111.7300      12.5        63       133        60
OIR    2025250     91400   17.9000 -111.7400      12.5        62       132        60
OIR    2025250     91400   17.9000 -111.7500      12.5        62       131        60
OIR    2025250     91400   17.9000 -111.7600      12.4        61       130        60
OIR    2025250     91400   17.9000 -111.7700      12.4        61       129        60
OIR    2025250     91400   17.9000 -111.7800      12.4        61       128        60
OIR    2025250     91400   17.9000 -111.7900      12.5        60       128        60
OIR    2025250     91400   17.9000 -111.8000      12.7        60       129        60
OIR    2025250     91400   17.9000 -111.8100      12.8        59       129        60
OIR    2025250     91400   17.9000 -111.8200      12.9        59       128        60
OIR    2025250     91400   17.9000 -111.8300      13.0        59       128        60
OIR    2025250     91400   17.9000 -111.8400      13.0        59       128        60
OIR    2025250     91400   17.9000 -111.8500      13.0        59       127        60
OIR    2025250     91400   17.9000 -111.8600      13.1        59       125        60
OIR    2025250     91400   17.9000 -111.8700      13.1        58       123        60
OIR    2025250     91400   17.9000 -111.8800      13.1        58       122        60
OIR    2025250     91400   17.9000 -111.8900      13.1        58       122        60
OIR    2025250     91400   17.9000 -111.9000      13.1        58       123        60
OIR    2025250     91400   17.9000 -111.9100      13.1        58       125        60
OIR    2025250     91400   17.9000 -111.9200      13.1        58       128        60
OIR    2025250     91400   17.9000 -111.9300      13.1        58       129        60
OIR    2025250     91400   17.9000 -111.9400      13.1        58       130        60
OIR    2025250     91400   17.9000 -111.9500      13.1        58       130        60
OIR    2025250     91400   17.9000 -111.9600      13.1        58       129        60
OIR    2025250     91400   17.9000 -111.9700      13.1        58       127        60
OIR    2025250     91400   17.9000 -111.9800      13.1        58       126        60
OIR    2025250     91400   17.9000 -111.9900      13.1        58       124        60
OIR    2025250     91400   17.9000 -112.0000      13.1        58       124        60
OIR    2025250     91400   17.9000 -112.0100      13.1        58       124        60
OIR    2025250     91400   17.9000 -112.0200      13.2        58       124        60
OIR    2025250     91400   17.9000 -112.0300      13.2        57       124        60
OIR    2025250     91400   17.9000 -112.0400      13.2        57       124        60
OIR    2025250     91400   17.9000 -112.0500      13.1        57       124        60
OIR    2025250     91400   17.9000 -112.0600      12.5        59       124        60
OIR    2025250     91400   17.9000 -112.0700      11.3        66       122        60
OIR    2025250     91400   17.9000 -112.0800      10.9        69       119        60
OIR    2025250     91400   17.9000 -112.0900      10.8        72       116        60
OIR    2025250     91400   17.9000 -112.1000      10.9        74       112        60
OIR    2025250     91400   17.9000 -112.1100      10.8        75       109        60
OIR    2025250     91400   17.9000 -112.1200      10.8        75       109        60
OIR    2025250     91400   17.9000 -112.1300      10.8        74       108        60
OIR    2025250     91400   17.9000 -112.1400      10.9        71       111        60
OIR    2025250     91400   17.9000 -112.1500      11.4        65       113        60
OIR    2025250     91400   17.9000 -112.1600      11.8        60       116        60
OIR    2025250     91400   17.9000 -112.1700      11.8        56       122        60
OIR    2025250     91400   17.9000 -112.1800      10.9        51       127        60
OIR    2025250     91400   17.9000 -112.1900      10.5        51       126        60
OIR    2025250     91400   17.9000 -112.2000       9.6        48       125        60
OIR    2025250     91400   17.9000 -112.2100       9.3        46       122        60
OIR    2025250     91400   17.9000 -112.2200       8.1        41       117        60
OIR    2025250     91400   17.9000 -112.2300       7.5       235       114        60
OIR    2025250     91400   17.9000 -112.2400      52.3       213       109        60
OIR    2025250     91400   17.9000 -112.2500      61.2       202       104        60
OIR    2025250     91400   17.9000 -112.2600      60.6       175       104        60
OIR    2025250     91400   17.9000 -112.2700      52.4       153       103        60
OIR    2025250     91400   17.9000 -112.2800      27.4       115       103        60
OIR    2025250     91400   17.9000 -112.2900      15.4        77       103        60
OIR    2025250     91400   17.9000 -112.3000      11.6        51       103        60
OIR    2025250     91400   17.9000 -112.3100      10.8        43       103        60
OIR    2025250     91400   17.9000 -112.3200      10.3        40       103        60
OIR    2025250     91400   17.9000 -112.3300      10.1        39       103        60
OIR    2025250     91400   17.9000 -112.3400       9.8        39       103        60
OIR    2025250     91400   17.9000 -112.3500       9.4        39       103        60
OIR    2025250     91400   17.9000 -112.3600       8.8        41       104        60
OIR    2025250     91400   17.9000 -112.3700       8.1        45       104        60
OIR    2025250     91400   17.9000 -112.3800       6.9        49       105        60
OIR    2025250     91400   17.9000 -112.3900       5.7        60       107        60
OIR    2025250     91400   17.9000 -112.4000       5.1        68       105        60
OIR    2025250     91400   17.9000 -112.4100       4.7        76       104        60
OIR    2025250     91400   17.9000 -112.4200       4.6        80       104        60
OIR    2025250     91400   17.9000 -112.4300       4.4        84       103        60
OIR    2025250     91400   17.9000 -112.4400       4.3        87       103        60
OIR    2025250     91400   17.9000 -112.4500       4.2        89       103        60
OIR    2025250     91400   17.9000 -112.4600       4.3        90       103        60
OIR    2025250     91400   17.9000 -112.4700       4.6        90       103        60
OIR    2025250     91400   17.9000 -112.4800       4.7        89       103        60
OIR    2025250     91400   17.9000 -112.4900       4.7        88       103        60
OIR    2025250     91400   17.9000 -112.5000       4.8        86       103        60
OIR    2025250     91400   17.9000 -112.5100       4.9        84       103        60
OIR    2025250     91400   17.9000 -112.5200       4.8        82       103        60
OIR    2025250     91400   17.9000 -112.5300       4.8        81       104        60
OIR    2025250     91400   17.9000 -112.5400       4.7        80       105        60
OIR    2025250     91400   17.9000 -112.5500       4.6        79       108        60
OIR    2025250     91400   17.9000 -112.5600       4.5        79       110        60
OIR    2025250     91400   17.9000 -112.5700       4.4        78       113        60
OIR    2025250     91400   17.9000 -113.2000       4.0       103       126        60
OIR    2025250     91400   17.9000 -113.2100       4.0       105       126        60
OIR    2025250     91400   17.9000 -113.2200       4.0       105       126        60
OIR    2025250     91400   17.9000 -113.2300       4.1       104       125        60
OIR    2025250     91400   17.9000 -113.2400       4.1       103       124        60
OIR    2025250     91400   17.9000 -113.2500       4.2       102       126        60
OIR    2025250     91400   17.9000 -113.2600       4.3       100       128        60
OIR    2025250     91400   17.9000 -113.2700       4.3        99       129        60
OIR    2025250     91400   17.9000 -113.2800       4.3        98       130        60
OIR    2025250     91400   17.9000 -113.2900       4.3        96       132        60
OIR    2025250     91400   17.9000 -113.3000       4.3        94       135        60
OIR    2025250     91400   17.9000 -113.3100       4.4        92       137        60
OIR    2025250     91400   17.9000 -113.3200       4.4        90       138        60
OIR    2025250     91400   17.9000 -113.3300       4.4        87       139        60
OIR    2025250     91400   17.9000 -113.3400       4.2        80       139        60
OIR    2025250     91400   17.9000 -113.3500       4.4        68       138        60
OIR    2025250     91400   17.9000 -113.3600       4.4        61       139        60
OIR    2025250     91400   17.9000 -113.3700       4.5        57       142        60
OIR    2025250     91400   17.9000 -113.5100       7.8       357       139        60
OIR    2025250     91400   17.9000 -113.5200       7.5       358       140        60
OIR    2025250     91400   17.9000 -113.5800       7.3       354       143        60
OIR    2025250     91400   17.9000 -113.5900       7.4       354       143        60
OIR    2025250     91400   17.9000 -113.6000       7.4       354       143        60
OIR    2025250     91400   17.9000 -113.6100       7.5       354       143        60
OIR    2025250     91400   17.9000 -113.6200       7.5       353       143        60
OIR    2025250     91400   17.9000 -113.6300       7.5       353       143        60
OIR    2025250     91400   17.9000 -113.6400       7.4       353       141        60
OIR    2025250     91400   17.9000 -113.6500       7.3       352       139        60
OIR    2025250     91400   17.9000 -113.6600       7.0       350       137        60
OIR    2025250     91400   17.9000 -113.6700       6.9       349       136        60
OIR    2025250     91400   17.9000 -113.6800       6.7       346       136        60
OIR    2025250     91400   17.9000 -113.6900       6.6       347       137        60
OIR    2025250     91400   17.9000 -113.7000       6.8       349       140        60
OIR    2025250     91400   17.9000 -113.7500       6.1       353       144        60
OIR    2025250     91400   17.9000 -113.7600       6.0       355       140        60
OIR    2025250     91400   17.9000 -113.7700       6.1       357       139        60
OIR    2025250     91400   17.9000 -113.7800       6.2       360       139        60
OIR    2025250     91400   17.9000 -113.7900       6.3         1       139        60
OIR    2025250     91400   17.9000 -113.8000       6.3         3       140        60
OIR    2025250     91400   17.9000 -113.8100       6.2         4       140        60
OIR    2025250     91400   17.9000 -113.8200       6.2         6       139        60
OIR    2025250     91400   17.9000 -113.8300       6.0         9       137        60
OIR    2025250     91400   17.9000 -113.8400       5.9        10       138        60
OIR    2025250     91400   17.9000 -113.8500       5.9        13       139        60
OIR    2025250     91400   17.9000 -113.8600       5.8        14       140        60
OIR    2025250     91400   17.9000 -113.8700       5.7        15       141        60
OIR    2025250     91400   17.9000 -113.8800       5.4        15       142        60
OIR    2025250     91400   17.9000 -113.8900       5.2        17       139        60
OIR    2025250     91400   17.9000 -113.9000       4.6        18       135        60
OIR    2025250     91400   17.9000 -113.9100       4.4        19       136        60
OIR    2025250     91400   17.9000 -113.9200       4.3        20       137        60
OIR    2025250     91400   17.9000 -113.9300       4.2        20       137        60
OIR    2025250     91400   17.9000 -113.9400       4.2        20       138        60
OIR    2025250     91400   17.9000 -113.9500       4.1        19       139        60
OIR    2025250     91400   17.9000 -113.9600       4.1        19       139        60
OIR    2025250     91400   17.9000 -113.9700       4.0        18       140        60
OIR    2025250     91400   17.9000 -113.9800       4.0        17       141        60
OIR    2025250     91400   17.8900 -110.5100      16.3        53       142        60
OIR    2025250     91400   17.8900 -110.5200      16.3        53       140        60
OIR    2025250     91400   17.8900 -110.5300      16.3        54       138        60
OIR    2025250     91400   17.8900 -110.5400      16.3        54       136        60
OIR    2025250     91400   17.8900 -110.5500      16.3        54       135        60
OIR    2025250     91400   17.8900 -110.5600      16.3        54       133        60
OIR    2025250     91400   17.8900 -110.5700      16.3        54       132        60
OIR    2025250     91400   17.8900 -110.5800      16.3        54       132        60
OIR    2025250     91400   17.8900 -110.5900      16.3        54       131        60
OIR    2025250     91400   17.8900 -110.6000      16.3        54       130        60
OIR    2025250     91400   17.8900 -110.6100      16.3        54       130        60
OIR    2025250     91400   17.8900 -110.6200      16.3        54       132        60
OIR    2025250     91400   17.8900 -110.6300      16.2        54       133        60
OIR    2025250     91400   17.8900 -110.6400      16.2        54       133        60
OIR    2025250     91400   17.8900 -110.6500      16.2        54       132        60
OIR    2025250     91400   17.8900 -110.6600      16.2        54       132        60
OIR    2025250     91400   17.8900 -110.6700      16.2        54       133        60
OIR    2025250     91400   17.8900 -110.6800      16.2        55       133        60
OIR    2025250     91400   17.8900 -110.6900      16.2        55       132        60
OIR    2025250     91400   17.8900 -110.7000      16.1        55       131        60
OIR    2025250     91400   17.8900 -110.7100      16.1        55       131        60
OIR    2025250     91400   17.8900 -110.7200      16.1        55       130        60
OIR    2025250     91400   17.8900 -110.7300      16.1        55       132        60
OIR    2025250     91400   17.8900 -110.7400      16.1        55       139        60
OIR    2025250     91400   17.8900 -111.5100      13.8        66       141        60
OIR    2025250     91400   17.8900 -111.5200      13.7        66       136        60
OIR    2025250     91400   17.8900 -111.5300      13.7        66       131        60
OIR    2025250     91400   17.8900 -111.5400      13.5        67       128        60
OIR    2025250     91400   17.8900 -111.5500      13.5        66       125        60
OIR    2025250     91400   17.8900 -111.5600      13.4        66       121        60
OIR    2025250     91400   17.8900 -111.5700      13.5        66       116        60
OIR    2025250     91400   17.8900 -111.5800      13.5        66       114        60
OIR    2025250     91400   17.8900 -111.5900      13.5        66       113        60
OIR    2025250     91400   17.8900 -111.6000      13.4        66       112        60
OIR    2025250     91400   17.8900 -111.6100      13.4        66       117        60
OIR    2025250     91400   17.8900 -111.6200      13.3        66       124        60
OIR    2025250     91400   17.8900 -111.6300      13.1        66       124        60
OIR    2025250     91400   17.8900 -111.6400      12.9        65       125        60
OIR    2025250     91400   17.8900 -111.6500      12.8        65       125        60
OIR    2025250     91400   17.8900 -111.6600      12.7        64       126        60
OIR    2025250     91400   17.8900 -111.6700      12.5        64       127        60
OIR    2025250     91400   17.8900 -111.6800      12.5        64       128        60
OIR    2025250     91400   17.8900 -111.6900      12.5        64       130        60
OIR    2025250     91400   17.8900 -111.7000      12.6        64       132        60
OIR    2025250     91400   17.8900 -111.7100      12.7        63       134        60
OIR    2025250     91400   17.8900 -111.7200      12.8        63       134        60
OIR    2025250     91400   17.8900 -111.7300      12.9        62       133        60
OIR    2025250     91400   17.8900 -111.7400      12.9        62       132        60
OIR    2025250     91400   17.8900 -111.7500      12.9        61       131        60
OIR    2025250     91400   17.8900 -111.7600      12.7        61       129        60
OIR    2025250     91400   17.8900 -111.7700      12.7        60       127        60
OIR    2025250     91400   17.8900 -111.7800      12.8        60       126        60
OIR    2025250     91400   17.8900 -111.7900      12.9        59       126        60
OIR    2025250     91400   17.8900 -111.8000      13.0        59       127        60
OIR    2025250     91400   17.8900 -111.8100      13.0        59       127        60
OIR    2025250     91400   17.8900 -111.8200      13.1        59       127        60
OIR    2025250     91400   17.8900 -111.8300      13.1        59       126        60
OIR    2025250     91400   17.8900 -111.8400      13.1        59       127        60
OIR    2025250     91400   17.8900 -111.8500      13.1        59       127        60
OIR    2025250     91400   17.8900 -111.8600      13.1        58       126        60
OIR    2025250     91400   17.8900 -111.8700      13.1        58       125        60
OIR    2025250     91400   17.8900 -111.8800      13.1        58       124        60
OIR    2025250     91400   17.8900 -111.8900      13.1        58       124        60
OIR    2025250     91400   17.8900 -111.9000      13.1        58       124        60
OIR    2025250     91400   17.8900 -111.9100      13.1        58       125        60
OIR    2025250     91400   17.8900 -111.9200      13.1        58       127        60
OIR    2025250     91400   17.8900 -111.9300      13.1        58       128        60
OIR    2025250     91400   17.8900 -111.9400      13.1        58       129        60
OIR    2025250     91400   17.8900 -111.9500      13.1        58       129        60
OIR    2025250     91400   17.8900 -111.9600      13.1        58       129        60
OIR    2025250     91400   17.8900 -111.9700      13.1        58       129        60
OIR    2025250     91400   17.8900 -111.9800      13.1        58       127        60
OIR    2025250     91400   17.8900 -111.9900      13.1        58       126        60
OIR    2025250     91400   17.8900 -112.0000      13.1        58       124        60
OIR    2025250     91400   17.8900 -112.0100      13.2        58       125        60
OIR    2025250     91400   17.8900 -112.0200      13.3        57       125        60
OIR    2025250     91400   17.8900 -112.0300      13.3        57       125        60
OIR    2025250     91400   17.8900 -112.0400      13.3        57       126        60
OIR    2025250     91400   17.8900 -112.0500      13.3        57       126        60
OIR    2025250     91400   17.8900 -112.0600      12.8        58       127        60
OIR    2025250     91400   17.8900 -112.0700      12.1        60       125        60
OIR    2025250     91400   17.8900 -112.0800      11.7        62       123        60
OIR    2025250     91400   17.8900 -112.0900      11.5        64       120        60
OIR    2025250     91400   17.8900 -112.1000      11.4        66       117        60
OIR    2025250     91400   17.8900 -112.1100      11.6        65       115        60
OIR    2025250     91400   17.8900 -112.1200      11.9        62       115        60
OIR    2025250     91400   17.8900 -112.1300      12.5        56       115        60
OIR    2025250     91400   17.8900 -112.1400      13.2        51       116        60
OIR    2025250     91400   17.8900 -112.1500      13.5        49       117        60
OIR    2025250     91400   17.8900 -112.1600      13.2        51       121        60
OIR    2025250     91400   17.8900 -112.1700      13.0        51       125        60
OIR    2025250     91400   17.8900 -112.1800      12.0        48       129        60
OIR    2025250     91400   17.8900 -112.1900      11.6        47       128        60
OIR    2025250     91400   17.8900 -112.2000      10.4        46       127        60
OIR    2025250     91400   17.8900 -112.2100      10.1        45       124        60
OIR    2025250     91400   17.8900 -112.2200      10.2        42       120        60
OIR    2025250     91400   17.8900 -112.2300       9.8        40       116        60
OIR    2025250     91400   17.8900 -112.2400       5.3        41       112        60
OIR    2025250     91400   17.8900 -112.2600       5.4        97       107        60
OIR    2025250     91400   17.8900 -112.2700       8.1        66       105        60
OIR    2025250     91400   17.8900 -112.2800      10.5        49       104        60
OIR    2025250     91400   17.8900 -112.2900      10.5        44       103        60
OIR    2025250     91400   17.8900 -112.3000      10.3        40       103        60
OIR    2025250     91400   17.8900 -112.3100      10.3        39       103        60
OIR    2025250     91400   17.8900 -112.3200      10.3        39       103        60
OIR    2025250     91400   17.8900 -112.3300      10.2        39       103        60
OIR    2025250     91400   17.8900 -112.3400      10.1        39       103        60
OIR    2025250     91400   17.8900 -112.3500       9.9        39       104        60
OIR    2025250     91400   17.8900 -112.3600       9.4        40       104        60
OIR    2025250     91400   17.8900 -112.3700       8.9        41       104        60
OIR    2025250     91400   17.8900 -112.3800       7.9        45       105        60
OIR    2025250     91400   17.8900 -112.3900       6.5        52       107        60
OIR    2025250     91400   17.8900 -112.4000       5.5        62       105        60
OIR    2025250     91400   17.8900 -112.4100       4.8        73       104        60
OIR    2025250     91400   17.8900 -112.4200       4.5        78       104        60
OIR    2025250     91400   17.8900 -112.4300       4.3        83       103        60
OIR    2025250     91400   17.8900 -112.4400       4.0        85       103        60
OIR    2025250     91400   17.8900 -112.4700       4.5        86       103        60
OIR    2025250     91400   17.8900 -112.4800       4.7        85       103        60
OIR    2025250     91400   17.8900 -112.4900       4.7        83       103        60
OIR    2025250     91400   17.8900 -112.5000       4.8        82       103        60
OIR    2025250     91400   17.8900 -112.5100       4.8        81       103        60
OIR    2025250     91400   17.8900 -112.5200       4.8        80       103        60
OIR    2025250     91400   17.8900 -112.5300       4.7        79       103        60
OIR    2025250     91400   17.8900 -112.5400       4.7        78       104        60
OIR    2025250     91400   17.8900 -112.5500       4.6        78       107        60
OIR    2025250     91400   17.8900 -112.5600       4.6        78       109        60
OIR    2025250     91400   17.8900 -112.5700       4.5        77       111        60
OIR    2025250     91400   17.8900 -112.8100       4.1        32       129        60
OIR    2025250     91400   17.8900 -112.8200       4.3        31       130        60
OIR    2025250     91400   17.8900 -112.8300       4.3        31       130        60
OIR    2025250     91400   17.8900 -112.8400       4.1        31       131        60
OIR    2025250     91400   17.8900 -113.2200       4.0       105       122        60
OIR    2025250     91400   17.8900 -113.2300       4.1       103       121        60
OIR    2025250     91400   17.8900 -113.2400       4.2       101       120        60
OIR    2025250     91400   17.8900 -113.2500       4.2       100       121        60
OIR    2025250     91400   17.8900 -113.2600       4.2        99       123        60
OIR    2025250     91400   17.8900 -113.2700       4.2        98       125        60
OIR    2025250     91400   17.8900 -113.2800       4.2        97       128        60
OIR    2025250     91400   17.8900 -113.2900       4.3        96       131        60
OIR    2025250     91400   17.8900 -113.3000       4.3        95       132        60
OIR    2025250     91400   17.8900 -113.3100       4.3        93       134        60
OIR    2025250     91400   17.8900 -113.3200       4.3        91       136        60
OIR    2025250     91400   17.8900 -113.3300       4.3        87       138        60
OIR    2025250     91400   17.8900 -113.3400       4.0        80       138        60
OIR    2025250     91400   17.8900 -113.3500       4.0        67       137        60
OIR    2025250     91400   17.8900 -113.3600       4.3        58       138        60
OIR    2025250     91400   17.8900 -113.3700       4.4        55       140        60
OIR    2025250     91400   17.8900 -113.3800       4.5        53       143        60
OIR    2025250     91400   17.8900 -113.5100       8.0       357       142        60
OIR    2025250     91400   17.8900 -113.5200       8.0       357       139        60
OIR    2025250     91400   17.8900 -113.5300       7.9       357       141        60
OIR    2025250     91400   17.8900 -113.5700       7.3       354       143        60
OIR    2025250     91400   17.8900 -113.5800       7.4       354       142        60
OIR    2025250     91400   17.8900 -113.5900       7.5       354       142        60
OIR    2025250     91400   17.8900 -113.6000       7.5       353       143        60
OIR    2025250     91400   17.8900 -113.6100       7.5       353       143        60
OIR    2025250     91400   17.8900 -113.6200       7.5       353       142        60
OIR    2025250     91400   17.8900 -113.6300       7.5       353       140        60
OIR    2025250     91400   17.8900 -113.6400       7.5       353       140        60
OIR    2025250     91400   17.8900 -113.6500       7.4       353       141        60
OIR    2025250     91400   17.8900 -113.6600       7.4       352       139        60
OIR    2025250     91400   17.8900 -113.6700       7.3       351       137        60
OIR    2025250     91400   17.8900 -113.6800       7.2       350       137        60
OIR    2025250     91400   17.8900 -113.6900       7.2       350       138        60
OIR    2025250     91400   17.8900 -113.7000       7.3       351       140        60
OIR    2025250     91400   17.8900 -113.7600       6.1       357       141        60
OIR    2025250     91400   17.8900 -113.7700       6.2       360       139        60
OIR    2025250     91400   17.8900 -113.7800       6.3         1       138        60
OIR    2025250     91400   17.8900 -113.7900       6.3         2       137        60
OIR    2025250     91400   17.8900 -113.8000       6.3         3       138        60
OIR    2025250     91400   17.8900 -113.8100       6.3         3       139        60
OIR    2025250     91400   17.8900 -113.8200       6.2         5       138        60
OIR    2025250     91400   17.8900 -113.8300       6.1         9       136        60
OIR    2025250     91400   17.8900 -113.8400       5.9        10       136        60
OIR    2025250     91400   17.8900 -113.8500       5.8        12       135        60
OIR    2025250     91400   17.8900 -113.8600       5.8        13       136        60
OIR    2025250     91400   17.8900 -113.8700       5.7        14       138        60
OIR    2025250     91400   17.8900 -113.8800       5.5        15       141        60
OIR    2025250     91400   17.8900 -113.8900       5.0        17       138        60
OIR    2025250     91400   17.8900 -113.9000       4.6        19       133        60
OIR    2025250     91400   17.8900 -113.9100       4.3        19       134        60
OIR    2025250     91400   17.8900 -113.9200       4.3        19       139        60
OIR    2025250     91400   17.8900 -113.9300       4.2        19       142        60
OIR    2025250     91400   17.8900 -113.9700       4.1        18       143        60
OIR    2025250     91400   17.8900 -113.9800       4.0        17       142        60
OIR    2025250     91400   17.8900 -113.9900       4.0        17       142        60
OIR    2025250     91400   17.8800 -110.5300      16.3        54       142        60
OIR    2025250     91400   17.8800 -110.5400      16.3        54       140        60
OIR    2025250     91400   17.8800 -110.5500      16.3        54       136        60
OIR    2025250     91400   17.8800 -110.5600      16.3        54       132        60
OIR    2025250     91400   17.8800 -110.5700      16.3        54       132        60
OIR    2025250     91400   17.8800 -110.5800      16.3        54       132        60
OIR    2025250     91400   17.8800 -110.5900      16.3        54       132        60
OIR    2025250     91400   17.8800 -110.6000      16.3        54       131        60
OIR    2025250     91400   17.8800 -110.6100      16.3        54       130        60
OIR    2025250     91400   17.8800 -110.6200      16.3        54       132        60
OIR    2025250     91400   17.8800 -110.6300      16.2        54       133        60
OIR    2025250     91400   17.8800 -110.6400      16.2        54       133        60
OIR    2025250     91400   17.8800 -110.6500      16.2        54       134        60
OIR    2025250     91400   17.8800 -110.6600      16.2        54       134        60
OIR    2025250     91400   17.8800 -110.6700      16.2        54       134        60
OIR    2025250     91400   17.8800 -110.6800      16.1        54       134        60
OIR    2025250     91400   17.8800 -110.6900      16.1        55       135        60
OIR    2025250     91400   17.8800 -110.7000      16.1        55       136        60
OIR    2025250     91400   17.8800 -110.7100      16.0        55       135        60
OIR    2025250     91400   17.8800 -110.7200      16.0        55       134        60
OIR    2025250     91400   17.8800 -110.7300      16.0        55       134        60
OIR    2025250     91400   17.8800 -110.7400      16.0        55       139        60
OIR    2025250     91400   17.8800 -111.5100      13.8        64       141        60
OIR    2025250     91400   17.8800 -111.5200      13.7        65       136        60
OIR    2025250     91400   17.8800 -111.5300      13.6        66       131        60
OIR    2025250     91400   17.8800 -111.5400      13.5        66       129        60
OIR    2025250     91400   17.8800 -111.5500      13.5        66       127        60
OIR    2025250     91400   17.8800 -111.5600      13.4        66       125        60
OIR    2025250     91400   17.8800 -111.5700      13.5        66       123        60
OIR    2025250     91400   17.8800 -111.5800      13.4        66       121        60
OIR    2025250     91400   17.8800 -111.5900      13.4        66       120        60
OIR    2025250     91400   17.8800 -111.6000      13.4        66       119        60
OIR    2025250     91400   17.8800 -111.6100      13.4        66       122        60
OIR    2025250     91400   17.8800 -111.6200      13.3        66       124        60
OIR    2025250     91400   17.8800 -111.6300      13.1        65       126        60
OIR    2025250     91400   17.8800 -111.6400      13.0        64       126        60
OIR    2025250     91400   17.8800 -111.6500      12.9        64       127        60
OIR    2025250     91400   17.8800 -111.6600      12.8        64       128        60
OIR    2025250     91400   17.8800 -111.6700      12.8        63       129        60
OIR    2025250     91400   17.8800 -111.6800      12.7        63       130        60
OIR    2025250     91400   17.8800 -111.6900      12.7        63       131        60
OIR    2025250     91400   17.8800 -111.7000      12.8        63       132        60
OIR    2025250     91400   17.8800 -111.7100      12.9        63       132        60
OIR    2025250     91400   17.8800 -111.7200      13.0        62       133        60
OIR    2025250     91400   17.8800 -111.7300      13.1        61       132        60
OIR    2025250     91400   17.8800 -111.7400      13.1        61       132        60
OIR    2025250     91400   17.8800 -111.7500      13.1        60       131        60
OIR    2025250     91400   17.8800 -111.7600      13.1        60       129        60
OIR    2025250     91400   17.8800 -111.7700      13.1        59       128        60
OIR    2025250     91400   17.8800 -111.7800      13.1        59       127        60
OIR    2025250     91400   17.8800 -111.7900      13.1        59       126        60
OIR    2025250     91400   17.8800 -111.8000      13.1        59       127        60
OIR    2025250     91400   17.8800 -111.8100      13.1        59       128        60
OIR    2025250     91400   17.8800 -111.8200      13.1        59       128        60
OIR    2025250     91400   17.8800 -111.8300      13.1        59       128        60
OIR    2025250     91400   17.8800 -111.8400      13.1        59       129        60
OIR    2025250     91400   17.8800 -111.8500      13.1        59       129        60
OIR    2025250     91400   17.8800 -111.8600      13.1        58       129        60
OIR    2025250     91400   17.8800 -111.8700      13.1        58       128        60
OIR    2025250     91400   17.8800 -111.8800      13.1        58       127        60
OIR    2025250     91400   17.8800 -111.8900      13.1        58       126        60
OIR    2025250     91400   17.8800 -111.9000      13.1        58       126        60
OIR    2025250     91400   17.8800 -111.9100      13.1        58       126        60
OIR    2025250     91400   17.8800 -111.9200      13.1        58       127        60
OIR    2025250     91400   17.8800 -111.9300      13.1        58       128        60
OIR    2025250     91400   17.8800 -111.9400      13.1        58       129        60
OIR    2025250     91400   17.8800 -111.9500      13.1        58       129        60
OIR    2025250     91400   17.8800 -111.9600      13.1        58       130        60
OIR    2025250     91400   17.8800 -111.9700      13.1        58       130        60
OIR    2025250     91400   17.8800 -111.9800      13.1        58       129        60
OIR    2025250     91400   17.8800 -111.9900      13.1        58       127        60
OIR    2025250     91400   17.8800 -112.0000      13.1        57       125        60
OIR    2025250     91400   17.8800 -112.0100      13.2        57       125        60
OIR    2025250     91400   17.8800 -112.0200      13.3        57       125        60
OIR    2025250     91400   17.8800 -112.0300      13.4        56       126        60
OIR    2025250     91400   17.8800 -112.0400      13.4        56       127        60
OIR    2025250     91400   17.8800 -112.0500      13.4        56       128        60
OIR    2025250     91400   17.8800 -112.0600      13.2        56       129        60
OIR    2025250     91400   17.8800 -112.0700      12.8        57       128        60
OIR    2025250     91400   17.8800 -112.0800      12.5        58       126        60
OIR    2025250     91400   17.8800 -112.0900      12.3        59       124        60
OIR    2025250     91400   17.8800 -112.1000      12.2        59       122        60
OIR    2025250     91400   17.8800 -112.1100      12.3        59       121        60
OIR    2025250     91400   17.8800 -112.1200      12.8        56       120        60
OIR    2025250     91400   17.8800 -112.1300      13.6        50       120        60
OIR    2025250     91400   17.8800 -112.1400      13.8        48       121        60
OIR    2025250     91400   17.8800 -112.1500      13.9        48       123        60
OIR    2025250     91400   17.8800 -112.1600      13.8        48       125        60
OIR    2025250     91400   17.8800 -112.1700      13.7        48       128        60
OIR    2025250     91400   17.8800 -112.1800      13.4        46       130        60
OIR    2025250     91400   17.8800 -112.1900      12.9        46       130        60
OIR    2025250     91400   17.8800 -112.2000      11.4        45       128        60
OIR    2025250     91400   17.8800 -112.2100      10.4        44       125        60
OIR    2025250     91400   17.8800 -112.2200      10.3        42       122        60
OIR    2025250     91400   17.8800 -112.2300      10.2        41       119        60
OIR    2025250     91400   17.8800 -112.2400      10.4        39       116        60
OIR    2025250     91400   17.8800 -112.2500      10.4        39       113        60
OIR    2025250     91400   17.8800 -112.2600      10.3        39       111        60
OIR    2025250     91400   17.8800 -112.2700      10.3        40       109        60
OIR    2025250     91400   17.8800 -112.2800      10.3        40       107        60
OIR    2025250     91400   17.8800 -112.2900      10.3        40       104        60
OIR    2025250     91400   17.8800 -112.3000      10.3        39       103        60
OIR    2025250     91400   17.8800 -112.3100      10.3        39       103        60
OIR    2025250     91400   17.8800 -112.3200      10.3        39       103        60
OIR    2025250     91400   17.8800 -112.3300      10.2        39       104        60
OIR    2025250     91400   17.8800 -112.3400      10.1        38       104        60
OIR    2025250     91400   17.8800 -112.3500      10.1        38       104        60
OIR    2025250     91400   17.8800 -112.3600       9.8        38       104        60
OIR    2025250     91400   17.8800 -112.3700       9.4        39       104        60
OIR    2025250     91400   17.8800 -112.3800       8.7        41       105        60
OIR    2025250     91400   17.8800 -112.3900       7.7        46       107        60
OIR    2025250     91400   17.8800 -112.4000       6.2        56       105        60
OIR    2025250     91400   17.8800 -112.4100       5.2        70       104        60
OIR    2025250     91400   17.8800 -112.4200       4.5        82       104        60
OIR    2025250     91400   17.8800 -112.4700       4.1        79       103        60
OIR    2025250     91400   17.8800 -112.4800       4.6        82       103        60
OIR    2025250     91400   17.8800 -112.4900       4.7        81       103        60
OIR    2025250     91400   17.8800 -112.5000       4.8        81       103        60
OIR    2025250     91400   17.8800 -112.5100       4.8        80       103        60
OIR    2025250     91400   17.8800 -112.5200       4.8        79       103        60
OIR    2025250     91400   17.8800 -112.5300       4.8        78       103        60
OIR    2025250     91400   17.8800 -112.5400       4.7        77       104        60
OIR    2025250     91400   17.8800 -112.5500       4.7        77       105        60
OIR    2025250     91400   17.8800 -112.5600       4.6        77       107        60
OIR    2025250     91400   17.8800 -112.5700       4.4        75       109        60
OIR    2025250     91400   17.8800 -112.8000       4.2        29       124        60
OIR    2025250     91400   17.8800 -112.8100       4.4        30       126        60
OIR    2025250     91400   17.8800 -112.8200       4.5        30       127        60
OIR    2025250     91400   17.8800 -112.8300       4.5        30       128        60
OIR    2025250     91400   17.8800 -112.8400       4.4        30       129        60
OIR    2025250     91400   17.8800 -112.8500       4.2        31       130        60
OIR    2025250     91400   17.8800 -113.2300       4.0       101       120        60
OIR    2025250     91400   17.8800 -113.2400       4.1        99       119        60
OIR    2025250     91400   17.8800 -113.2500       4.1        98       120        60
OIR    2025250     91400   17.8800 -113.2600       4.1        98       122        60
OIR    2025250     91400   17.8800 -113.2700       4.2        97       123        60
OIR    2025250     91400   17.8800 -113.2800       4.2        97       125        60
OIR    2025250     91400   17.8800 -113.2900       4.2        96       128        60
OIR    2025250     91400   17.8800 -113.3000       4.2        96       130        60
OIR    2025250     91400   17.8800 -113.3100       4.2        95       132        60
OIR    2025250     91400   17.8800 -113.3200       4.2        93       134        60
OIR    2025250     91400   17.8800 -113.3300       4.0        91       136        60
OIR    2025250     91400   17.8800 -113.3700       4.2        54       141        60
OIR    2025250     91400   17.8800 -113.3800       4.4        51       144        60
OIR    2025250     91400   17.8800 -113.5100       8.1       357       143        60
OIR    2025250     91400   17.8800 -113.5200       8.1       356       140        60
OIR    2025250     91400   17.8800 -113.5300       8.0       357       139        60
OIR    2025250     91400   17.8800 -113.5400       7.9       357       138        60
OIR    2025250     91400   17.8800 -113.5500       7.7       356       139        60
OIR    2025250     91400   17.8800 -113.5600       7.6       355       140        60
OIR    2025250     91400   17.8800 -113.5700       7.5       354       141        60
OIR    2025250     91400   17.8800 -113.5800       7.5       353       141        60
OIR    2025250     91400   17.8800 -113.5900       7.5       353       141        60
OIR    2025250     91400   17.8800 -113.6000       7.5       353       142        60
OIR    2025250     91400   17.8800 -113.6100       7.5       353       142        60
OIR    2025250     91400   17.8800 -113.6200       7.5       353       139        60
OIR    2025250     91400   17.8800 -113.6300       7.5       353       136        60
OIR    2025250     91400   17.8800 -113.6400       7.5       353       137        60
OIR    2025250     91400   17.8800 -113.6500       7.5       352       141        60
OIR    2025250     91400   17.8800 -113.6600       7.4       352       142        60
OIR    2025250     91400   17.8800 -113.6700       7.4       352       139        60
OIR    2025250     91400   17.8800 -113.6800       7.4       351       137        60
OIR    2025250     91400   17.8800 -113.6900       7.4       351       139        60
OIR    2025250     91400   17.8800 -113.7000       7.4       352       141        60
OIR    2025250     91400   17.8800 -113.7100       7.4       352       143        60
OIR    2025250     91400   17.8800 -113.7600       6.7         0       143        60
OIR    2025250     91400   17.8800 -113.7700       6.5         2       142        60
OIR    2025250     91400   17.8800 -113.7800       6.5         2       142        60
OIR    2025250     91400   17.8800 -113.7900       6.4         2       142        60
OIR    2025250     91400   17.8800 -113.8000       6.4         3       141        60
OIR    2025250     91400   17.8800 -113.8100       6.3         3       140        60
OIR    2025250     91400   17.8800 -113.8200       6.2         5       138        60
OIR    2025250     91400   17.8800 -113.8300       6.1         8       135        60
OIR    2025250     91400   17.8800 -113.8400       6.0        10       134        60
OIR    2025250     91400   17.8800 -113.8500       5.8        11       135        60
OIR    2025250     91400   17.8800 -113.8600       5.7        12       136        60
OIR    2025250     91400   17.8800 -113.8700       5.6        14       137        60
OIR    2025250     91400   17.8800 -113.8800       5.5        15       139        60
OIR    2025250     91400   17.8800 -113.8900       5.1        17       139        60
OIR    2025250     91400   17.8800 -113.9000       4.6        18       139        60
OIR    2025250     91400   17.8800 -113.9100       4.3        19       140        60
OIR    2025250     91400   17.8800 -113.9200       4.2        19       143        60
OIR    2025250     91400   17.8700 -110.5400      16.3        54       143        60
OIR    2025250     91400   17.8700 -110.5500      16.3        54       137        60
OIR    2025250     91400   17.8700 -110.5600      16.3        54       132        60
OIR    2025250     91400   17.8700 -110.5700      16.3        54       131        60
OIR    2025250     91400   17.8700 -110.5800      16.3        54       133        60
OIR    2025250     91400   17.8700 -110.5900      16.3        54       133        60
OIR    2025250     91400   17.8700 -110.6000      16.3        54       132        60
OIR    2025250     91400   17.8700 -110.6100      16.3        54       131        60
OIR    2025250     91400   17.8700 -110.6200      16.3        54       131        60
OIR    2025250     91400   17.8700 -110.6300      16.2        54       131        60
OIR    2025250     91400   17.8700 -110.6400      16.2        54       133        60
OIR    2025250     91400   17.8700 -110.6500      16.2        54       134        60
OIR    2025250     91400   17.8700 -110.6600      16.2        54       135        60
OIR    2025250     91400   17.8700 -110.6700      16.1        54       134        60
OIR    2025250     91400   17.8700 -110.6800      16.1        54       133        60
OIR    2025250     91400   17.8700 -110.6900      16.0        55       135        60
OIR    2025250     91400   17.8700 -110.7000      16.0        55       139        60
OIR    2025250     91400   17.8700 -110.7100      16.0        55       140        60
OIR    2025250     91400   17.8700 -110.7200      16.0        55       138        60
OIR    2025250     91400   17.8700 -110.7300      16.0        55       136        60
OIR    2025250     91400   17.8700 -110.7400      16.0        55       141        60
OIR    2025250     91400   17.8700 -111.5100      14.0        63       143        60
OIR    2025250     91400   17.8700 -111.5200      13.8        64       138        60
OIR    2025250     91400   17.8700 -111.5300      13.5        65       132        60
OIR    2025250     91400   17.8700 -111.5400      13.5        66       129        60
OIR    2025250     91400   17.8700 -111.5500      13.5        66       127        60
OIR    2025250     91400   17.8700 -111.5600      13.5        66       126        60
OIR    2025250     91400   17.8700 -111.5700      13.4        66       126        60
OIR    2025250     91400   17.8700 -111.5800      13.4        66       126        60
OIR    2025250     91400   17.8700 -111.5900      13.4        66       126        60
OIR    2025250     91400   17.8700 -111.6000      13.4        66       125        60
OIR    2025250     91400   17.8700 -111.6100      13.4        66       126        60
OIR    2025250     91400   17.8700 -111.6200      13.3        65       127        60
OIR    2025250     91400   17.8700 -111.6300      13.2        64       127        60
OIR    2025250     91400   17.8700 -111.6400      13.0        64       127        60
OIR    2025250     91400   17.8700 -111.6500      13.0        63       127        60
OIR    2025250     91400   17.8700 -111.6600      12.9        63       128        60
OIR    2025250     91400   17.8700 -111.6700      12.9        63       130        60
OIR    2025250     91400   17.8700 -111.6800      12.9        62       131        60
OIR    2025250     91400   17.8700 -111.6900      12.9        62       132        60
OIR    2025250     91400   17.8700 -111.7000      13.0        62       133        60
OIR    2025250     91400   17.8700 -111.7100      13.1        62       132        60
OIR    2025250     91400   17.8700 -111.7200      13.2        61       132        60
OIR    2025250     91400   17.8700 -111.7300      13.3        61       132        60
OIR    2025250     91400   17.8700 -111.7400      13.3        60       131        60
OIR    2025250     91400   17.8700 -111.7500      13.3        60       130        60
OIR    2025250     91400   17.8700 -111.7600      13.2        59       130        60
OIR    2025250     91400   17.8700 -111.7700      13.2        59       129        60
OIR    2025250     91400   17.8700 -111.7800      13.2        59       128        60
OIR    2025250     91400   17.8700 -111.7900      13.2        59       126        60
OIR    2025250     91400   17.8700 -111.8000      13.2        59       128        60
OIR    2025250     91400   17.8700 -111.8100      13.2        59       130        60
OIR    2025250     91400   17.8700 -111.8200      13.2        59       130        60
OIR    2025250     91400   17.8700 -111.8300      13.2        59       131        60
OIR    2025250     91400   17.8700 -111.8400      13.2        59       131        60
OIR    2025250     91400   17.8700 -111.8500      13.1        59       131        60
OIR    2025250     91400   17.8700 -111.8600      13.1        59       131        60
OIR    2025250     91400   17.8700 -111.8700      13.1        58       130        60
OIR    2025250     91400   17.8700 -111.8800      13.1        58       130        60
OIR    2025250     91400   17.8700 -111.8900      13.1        58       129        60
OIR    2025250     91400   17.8700 -111.9000      13.1        58       129        60
OIR    2025250     91400   17.8700 -111.9100      13.1        58       129        60
OIR    2025250     91400   17.8700 -111.9200      13.1        58       129        60
OIR    2025250     91400   17.8700 -111.9300      13.1        58       129        60
OIR    2025250     91400   17.8700 -111.9400      13.1        58       129        60
OIR    2025250     91400   17.8700 -111.9500      13.1        58       128        60
OIR    2025250     91400   17.8700 -111.9600      13.2        58       129        60
OIR    2025250     91400   17.8700 -111.9700      13.2        58       131        60
OIR    2025250     91400   17.8700 -111.9800      13.1        58       131        60
OIR    2025250     91400   17.8700 -111.9900      13.2        57       129        60
OIR    2025250     91400   17.8700 -112.0000      13.2        57       127        60
OIR    2025250     91400   17.8700 -112.0100      13.3        57       126        60
OIR    2025250     91400   17.8700 -112.0200      13.4        56       126        60
OIR    2025250     91400   17.8700 -112.0300      13.5        56       126        60
OIR    2025250     91400   17.8700 -112.0400      13.6        55       127        60
OIR    2025250     91400   17.8700 -112.0500      13.6        55       128        60
OIR    2025250     91400   17.8700 -112.0600      13.5        54       129        60
OIR    2025250     91400   17.8700 -112.0700      13.3        54       129        60
OIR    2025250     91400   17.8700 -112.0800      13.1        55       127        60
OIR    2025250     91400   17.8700 -112.0900      13.1        55       126        60
OIR    2025250     91400   17.8700 -112.1000      13.0        54       125        60
OIR    2025250     91400   17.8700 -112.1100      13.0        54       124        60
OIR    2025250     91400   17.8700 -112.1200      13.5        51       123        60
OIR    2025250     91400   17.8700 -112.1300      13.9        49       122        60
OIR    2025250     91400   17.8700 -112.1400      13.9        48       121        60
OIR    2025250     91400   17.8700 -112.1500      13.9        48       123        60
OIR    2025250     91400   17.8700 -112.1600      13.9        48       124        60
OIR    2025250     91400   17.8700 -112.1700      13.8        47       126        60
OIR    2025250     91400   17.8700 -112.1800      13.7        47       128        60
OIR    2025250     91400   17.8700 -112.1900      13.6        46       128        60
OIR    2025250     91400   17.8700 -112.2000      12.9        45       126        60
OIR    2025250     91400   17.8700 -112.2100      10.9        44       124        60
OIR    2025250     91400   17.8700 -112.2200      10.5        42       122        60
OIR    2025250     91400   17.8700 -112.2300      10.4        40       119        60
OIR    2025250     91400   17.8700 -112.2400      10.4        40       116        60
OIR    2025250     91400   17.8700 -112.2500      10.4        39       114        60
OIR    2025250     91400   17.8700 -112.2600      10.3        39       113        60
OIR    2025250     91400   17.8700 -112.2700      10.3        39       111        60
OIR    2025250     91400   17.8700 -112.2800      10.3        39       110        60
OIR    2025250     91400   17.8700 -112.2900      10.3        39       107        60
OIR    2025250     91400   17.8700 -112.3000      10.3        39       104        60
OIR    2025250     91400   17.8700 -112.3100      10.3        39       104        60
OIR    2025250     91400   17.8700 -112.3200      10.3        39       104        60
OIR    2025250     91400   17.8700 -112.3300      10.3        39       104        60
OIR    2025250     91400   17.8700 -112.3400      10.2        38       104        60
OIR    2025250     91400   17.8700 -112.3500      10.1        38       104        60
OIR    2025250     91400   17.8700 -112.3600      10.0        37       104        60
OIR    2025250     91400   17.8700 -112.3700       9.8        38       104        60
OIR    2025250     91400   17.8700 -112.3800       9.3        39       105        60
OIR    2025250     91400   17.8700 -112.3900       8.5        43       107        60
OIR    2025250     91400   17.8700 -112.4000       7.4        50       105        60
OIR    2025250     91400   17.8700 -112.4100       6.0        72       104        60
OIR    2025250     91400   17.8700 -112.4200       5.9       125       104        60
OIR    2025250     91400   17.8700 -112.4300      14.7       166       104        60
OIR    2025250     91400   17.8700 -112.4500       6.2       265       103        60
OIR    2025250     91400   17.8700 -112.4600       5.3       295       103        60
OIR    2025250     91400   17.8700 -112.4800       4.7        76       103        60
OIR    2025250     91400   17.8700 -112.4900       4.8        78       103        60
OIR    2025250     91400   17.8700 -112.5000       4.9        78       103        60
OIR    2025250     91400   17.8700 -112.5100       4.9        78       103        60
OIR    2025250     91400   17.8700 -112.5200       4.9        77       103        60
OIR    2025250     91400   17.8700 -112.5300       4.8        77       103        60
OIR    2025250     91400   17.8700 -112.5400       4.8        76       104        60
OIR    2025250     91400   17.8700 -112.5500       4.7        76       104        60
OIR    2025250     91400   17.8700 -112.5600       4.6        75       105        60
OIR    2025250     91400   17.8700 -112.5700       4.3        72       108        60
OIR    2025250     91400   17.8700 -112.7400       4.2        34       113        60
OIR    2025250     91400   17.8700 -112.7500       4.3        32       116        60
OIR    2025250     91400   17.8700 -112.7600       4.3        30       119        60
OIR    2025250     91400   17.8700 -112.7700       4.4        28       120        60
OIR    2025250     91400   17.8700 -112.7800       4.5        27       121        60
OIR    2025250     91400   17.8700 -112.7900       4.5        28       122        60
OIR    2025250     91400   17.8700 -112.8000       4.5        29       121        60
OIR    2025250     91400   17.8700 -112.8100       4.5        30       121        60
OIR    2025250     91400   17.8700 -112.8200       4.5        30       122        60
OIR    2025250     91400   17.8700 -112.8300       4.5        30       122        60
OIR    2025250     91400   17.8700 -112.8400       4.5        30       124        60
OIR    2025250     91400   17.8700 -112.8500       4.4        30       126        60
OIR    2025250     91400   17.8700 -112.8600       4.1        30       128        60
OIR    2025250     91400   17.8700 -113.2500       4.0        97       119        60
OIR    2025250     91400   17.8700 -113.2600       4.1        97       120        60
OIR    2025250     91400   17.8700 -113.2700       4.1        97       121        60
OIR    2025250     91400   17.8700 -113.2800       4.2        97       123        60
OIR    2025250     91400   17.8700 -113.2900       4.2        96       124        60
OIR    2025250     91400   17.8700 -113.3000       4.2        96       127        60
OIR    2025250     91400   17.8700 -113.3100       4.2        97       131        60
OIR    2025250     91400   17.8700 -113.3200       4.0        99       133        60
OIR    2025250     91400   17.8700 -113.5100       8.1       357       141        60
OIR    2025250     91400   17.8700 -113.5200       8.1       356       137        60
OIR    2025250     91400   17.8700 -113.5300       8.1       356       138        60
OIR    2025250     91400   17.8700 -113.5400       8.0       356       139        60
OIR    2025250     91400   17.8700 -113.5500       7.9       356       138        60
OIR    2025250     91400   17.8700 -113.5600       7.8       355       137        60
OIR    2025250     91400   17.8700 -113.5700       7.7       354       137        60
OIR    2025250     91400   17.8700 -113.5800       7.5       354       140        60
OIR    2025250     91400   17.8700 -113.5900       7.5       353       143        60
OIR    2025250     91400   17.8700 -113.6000       7.5       353       144        60
OIR    2025250     91400   17.8700 -113.6200       7.5       353       141        60
OIR    2025250     91400   17.8700 -113.6300       7.5       353       137        60
OIR    2025250     91400   17.8700 -113.6400       7.5       353       137        60
OIR    2025250     91400   17.8700 -113.6500       7.5       352       140        60
OIR    2025250     91400   17.8700 -113.6600       7.5       352       141        60
OIR    2025250     91400   17.8700 -113.6700       7.4       352       138        60
OIR    2025250     91400   17.8700 -113.6800       7.4       352       136        60
OIR    2025250     91400   17.8700 -113.6900       7.4       352       138        60
OIR    2025250     91400   17.8700 -113.7000       7.4       352       141        60
OIR    2025250     91400   17.8700 -113.7100       7.4       352       141        60
OIR    2025250     91400   17.8700 -113.7200       7.4       352       141        60
OIR    2025250     91400   17.8700 -113.7300       7.3       352       142        60
OIR    2025250     91400   17.8700 -113.7400       7.3       354       143        60
OIR    2025250     91400   17.8700 -113.7500       7.1       356       143        60
OIR    2025250     91400   17.8700 -113.8000       6.4         3       143        60
OIR    2025250     91400   17.8700 -113.8100       6.4         3       141        60
OIR    2025250     91400   17.8700 -113.8200       6.3         4       139        60
OIR    2025250     91400   17.8700 -113.8300       6.1         7       136        60
OIR    2025250     91400   17.8700 -113.8400       6.0         9       133        60
OIR    2025250     91400   17.8700 -113.8500       5.8        10       134        60
OIR    2025250     91400   17.8700 -113.8600       5.6        11       136        60
OIR    2025250     91400   17.8700 -113.8700       5.5        12       137        60
OIR    2025250     91400   17.8700 -113.8800       5.4        14       138        60
OIR    2025250     91400   17.8700 -113.8900       5.2        15       141        60
OIR    2025250     91400   17.8600 -110.5500      16.3        54       142        60
OIR    2025250     91400   17.8600 -110.5600      16.3        54       138        60
OIR    2025250     91400   17.8600 -110.5700      16.3        54       135        60
OIR    2025250     91400   17.8600 -110.5800      16.3        54       136        60
OIR    2025250     91400   17.8600 -110.5900      16.3        54       136        60
OIR    2025250     91400   17.8600 -110.6000      16.3        54       134        60
OIR    2025250     91400   17.8600 -110.6100      16.3        54       133        60
OIR    2025250     91400   17.8600 -110.6200      16.3        54       132        60
OIR    2025250     91400   17.8600 -110.6300      16.2        54       132        60
OIR    2025250     91400   17.8600 -110.6400      16.2        54       133        60
OIR    2025250     91400   17.8600 -110.6500      16.2        54       135        60
OIR    2025250     91400   17.8600 -110.6600      16.1        54       136        60
OIR    2025250     91400   17.8600 -110.6700      16.1        54       135        60
OIR    2025250     91400   17.8600 -110.6800      16.0        54       134        60
OIR    2025250     91400   17.8600 -110.6900      16.0        55       136        60
OIR    2025250     91400   17.8600 -110.7000      15.9        55       141        60
OIR    2025250     91400   17.8600 -110.7200      15.9        55       142        60
OIR    2025250     91400   17.8600 -110.7300      15.9        55       139        60
OIR    2025250     91400   17.8600 -110.7400      15.9        56       142        60
OIR    2025250     91400   17.8600 -111.5100      14.0        63       144        60
OIR    2025250     91400   17.8600 -111.5200      13.7        64       139        60
OIR    2025250     91400   17.8600 -111.5300      13.5        65       134        60
OIR    2025250     91400   17.8600 -111.5400      13.5        65       130        60
OIR    2025250     91400   17.8600 -111.5500      13.5        66       128        60
OIR    2025250     91400   17.8600 -111.5600      13.5        66       127        60
OIR    2025250     91400   17.8600 -111.5700      13.4        66       128        60
OIR    2025250     91400   17.8600 -111.5800      13.4        66       129        60
OIR    2025250     91400   17.8600 -111.5900      13.4        65       130        60
OIR    2025250     91400   17.8600 -111.6000      13.4        65       130        60
OIR    2025250     91400   17.8600 -111.6100      13.3        65       130        60
OIR    2025250     91400   17.8600 -111.6200      13.3        64       130        60
OIR    2025250     91400   17.8600 -111.6300      13.2        64       130        60
OIR    2025250     91400   17.8600 -111.6400      13.1        63       129        60
OIR    2025250     91400   17.8600 -111.6500      13.0        63       128        60
OIR    2025250     91400   17.8600 -111.6600      13.0        62       128        60
OIR    2025250     91400   17.8600 -111.6700      13.0        62       129        60
OIR    2025250     91400   17.8600 -111.6800      13.0        62       131        60
OIR    2025250     91400   17.8600 -111.6900      13.0        62       132        60
OIR    2025250     91400   17.8600 -111.7000      13.1        62       134        60
OIR    2025250     91400   17.8600 -111.7100      13.3        61       134        60
OIR    2025250     91400   17.8600 -111.7200      13.4        60       134        60
OIR    2025250     91400   17.8600 -111.7300      13.4        60       133        60
OIR    2025250     91400   17.8600 -111.7400      13.4        60       131        60
OIR    2025250     91400   17.8600 -111.7500      13.4        59       130        60
OIR    2025250     91400   17.8600 -111.7600      13.3        59       130        60
OIR    2025250     91400   17.8600 -111.7700      13.3        59       129        60
OIR    2025250     91400   17.8600 -111.7800      13.3        59       129        60
OIR    2025250     91400   17.8600 -111.7900      13.3        59       130        60
OIR    2025250     91400   17.8600 -111.8000      13.2        59       130        60
OIR    2025250     91400   17.8600 -111.8100      13.2        59       131        60
OIR    2025250     91400   17.8600 -111.8200      13.2        59       132        60
OIR    2025250     91400   17.8600 -111.8300      13.2        59       133        60
OIR    2025250     91400   17.8600 -111.8400      13.2        59       133        60
OIR    2025250     91400   17.8600 -111.8500      13.2        59       132        60
OIR    2025250     91400   17.8600 -111.8600      13.2        59       131        60
OIR    2025250     91400   17.8600 -111.8700      13.2        58       131        60
OIR    2025250     91400   17.8600 -111.8800      13.2        58       131        60
OIR    2025250     91400   17.8600 -111.8900      13.2        58       131        60
OIR    2025250     91400   17.8600 -111.9000      13.2        58       131        60
OIR    2025250     91400   17.8600 -111.9100      13.2        58       130        60
OIR    2025250     91400   17.8600 -111.9200      13.2        58       130        60
OIR    2025250     91400   17.8600 -111.9300      13.2        58       130        60
OIR    2025250     91400   17.8600 -111.9400      13.2        58       130        60
OIR    2025250     91400   17.8600 -111.9500      13.2        58       129        60
OIR    2025250     91400   17.8600 -111.9600      13.2        58       129        60
OIR    2025250     91400   17.8600 -111.9700      13.2        57       131        60
OIR    2025250     91400   17.8600 -111.9800      13.2        57       132        60
OIR    2025250     91400   17.8600 -111.9900      13.2        57       130        60
OIR    2025250     91400   17.8600 -112.0000      13.3        56       128        60
OIR    2025250     91400   17.8600 -112.0100      13.5        56       127        60
OIR    2025250     91400   17.8600 -112.0200      13.5        55       127        60
OIR    2025250     91400   17.8600 -112.0300      13.6        55       127        60
OIR    2025250     91400   17.8600 -112.0400      13.7        54       128        60
OIR    2025250     91400   17.8600 -112.0500      13.8        54       129        60
OIR    2025250     91400   17.8600 -112.0600      13.8        53       130        60
OIR    2025250     91400   17.8600 -112.0700      13.8        52       130        60
OIR    2025250     91400   17.8600 -112.0800      13.9        51       129        60
OIR    2025250     91400   17.8600 -112.0900      13.8        51       127        60
OIR    2025250     91400   17.8600 -112.1000      13.7        51       127        60
OIR    2025250     91400   17.8600 -112.1100      13.7        50       127        60
OIR    2025250     91400   17.8600 -112.1200      13.8        49       126        60
OIR    2025250     91400   17.8600 -112.1300      14.0        48       124        60
OIR    2025250     91400   17.8600 -112.1400      14.0        48       122        60
OIR    2025250     91400   17.8600 -112.1500      13.9        48       122        60
OIR    2025250     91400   17.8600 -112.1600      13.9        48       123        60
OIR    2025250     91400   17.8600 -112.1700      13.9        47       124        60
OIR    2025250     91400   17.8600 -112.1800      13.8        47       125        60
OIR    2025250     91400   17.8600 -112.1900      13.7        47       125        60
OIR    2025250     91400   17.8600 -112.2000      13.4        46       124        60
OIR    2025250     91400   17.8600 -112.2100      12.6        45       123        60
OIR    2025250     91400   17.8600 -112.2200      10.9        42       121        60
OIR    2025250     91400   17.8600 -112.2300      10.5        40       117        60
OIR    2025250     91400   17.8600 -112.2400      10.4        40       116        60
OIR    2025250     91400   17.8600 -112.2500      10.4        40       114        60
OIR    2025250     91400   17.8600 -112.2600      10.4        39       113        60
OIR    2025250     91400   17.8600 -112.2700      10.4        39       113        60
OIR    2025250     91400   17.8600 -112.2800      10.3        39       112        60
OIR    2025250     91400   17.8600 -112.2900      10.3        39       110        60
OIR    2025250     91400   17.8600 -112.3000      10.3        39       108        60
OIR    2025250     91400   17.8600 -112.3100      10.3        39       107        60
OIR    2025250     91400   17.8600 -112.3200      10.3        39       105        60
OIR    2025250     91400   17.8600 -112.3300      10.3        38       104        60
OIR    2025250     91400   17.8600 -112.3400      10.3        38       104        60
OIR    2025250     91400   17.8600 -112.3500      10.3        37       104        60
OIR    2025250     91400   17.8600 -112.3600      10.2        37       104        60
OIR    2025250     91400   17.8600 -112.3700      10.1        37       104        60
OIR    2025250     91400   17.8600 -112.3800       9.9        37       104        60
OIR    2025250     91400   17.8600 -112.3900       9.4        38       105        60
OIR    2025250     91400   17.8600 -112.4000       8.9        43       105        60
OIR    2025250     91400   17.8600 -112.4100       9.5        46       104        60
OIR    2025250     91400   17.8600 -112.4200      16.6       124       104        60
OIR    2025250     91400   17.8600 -112.4300      27.7       156       104        60
OIR    2025250     91400   17.8600 -112.4400      27.2       235       103        60
OIR    2025250     91400   17.8600 -112.4500      48.3       291       103        60
OIR    2025250     91400   17.8600 -112.4600      38.0       306       103        60
OIR    2025250     91400   17.8600 -112.4700      12.3       325       103        60
OIR    2025250     91400   17.8600 -112.4800       5.0        66       103        60
OIR    2025250     91400   17.8600 -112.4900       4.9        76       103        60
OIR    2025250     91400   17.8600 -112.5000       4.9        77       103        60
OIR    2025250     91400   17.8600 -112.5100       4.9        77       103        60
OIR    2025250     91400   17.8600 -112.5200       4.9        76       103        60
OIR    2025250     91400   17.8600 -112.5300       4.9        76       103        60
OIR    2025250     91400   17.8600 -112.5400       4.8        76       104        60
OIR    2025250     91400   17.8600 -112.5500       4.8        74       104        60
OIR    2025250     91400   17.8600 -112.5600       4.6        72       105        60
OIR    2025250     91400   17.8600 -112.5700       4.2        65       107        60
OIR    2025250     91400   17.8600 -112.6800       4.0        28       116        60
OIR    2025250     91400   17.8600 -112.6900       4.5        29       116        60
OIR    2025250     91400   17.8600 -112.7000       4.7        31       115        60
OIR    2025250     91400   17.8600 -112.7100       4.8        31       114        60
OIR    2025250     91400   17.8600 -112.7200       4.7        31       114        60
OIR    2025250     91400   17.8600 -112.7300       4.6        31       113        60
OIR    2025250     91400   17.8600 -112.7400       4.6        31       112        60
OIR    2025250     91400   17.8600 -112.7500       4.5        30       115        60
OIR    2025250     91400   17.8600 -112.7600       4.5        29       119        60
OIR    2025250     91400   17.8600 -112.7700       4.6        28       121        60
OIR    2025250     91400   17.8600 -112.7800       4.6        28       121        60
OIR    2025250     91400   17.8600 -112.7900       4.6        28       121        60
OIR    2025250     91400   17.8600 -112.8000       4.6        29       120        60
OIR    2025250     91400   17.8600 -112.8100       4.5        30       117        60
OIR    2025250     91400   17.8600 -112.8200       4.5        30       117        60
OIR    2025250     91400   17.8600 -112.8300       4.5        30       117        60
OIR    2025250     91400   17.8600 -112.8400       4.5        30       119        60
OIR    2025250     91400   17.8600 -112.8500       4.5        30       122        60
OIR    2025250     91400   17.8600 -112.8600       4.4        30       125        60
OIR    2025250     91400   17.8600 -112.8700       4.1        30       125        60
OIR    2025250     91400   17.8600 -113.2600       4.0        97       119        60
OIR    2025250     91400   17.8600 -113.2700       4.1        97       120        60
OIR    2025250     91400   17.8600 -113.2800       4.1        97       122        60
OIR    2025250     91400   17.8600 -113.2900       4.2        97       124        60
OIR    2025250     91400   17.8600 -113.3000       4.2        97       126        60
OIR    2025250     91400   17.8600 -113.3100       4.1        98       128        60
OIR    2025250     91400   17.8600 -113.5100       8.1       357       139        60
OIR    2025250     91400   17.8600 -113.5200       8.1       357       134        60
OIR    2025250     91400   17.8600 -113.5300       8.1       356       137        60
OIR    2025250     91400   17.8600 -113.5400       8.1       356       139        60
OIR    2025250     91400   17.8600 -113.5500       8.0       356       139        60
OIR    2025250     91400   17.8600 -113.5600       7.9       355       135        60
OIR    2025250     91400   17.8600 -113.5700       7.8       355       132        60
OIR    2025250     91400   17.8600 -113.5800       7.6       354       138        60
OIR    2025250     91400   17.8600 -113.6300       7.5       353       140        60
OIR    2025250     91400   17.8600 -113.6400       7.5       353       138        60
OIR    2025250     91400   17.8600 -113.6500       7.5       352       138        60
OIR    2025250     91400   17.8600 -113.6600       7.5       352       138        60
OIR    2025250     91400   17.8600 -113.6700       7.5       352       136        60
OIR    2025250     91400   17.8600 -113.6800       7.4       352       134        60
OIR    2025250     91400   17.8600 -113.6900       7.4       352       136        60
OIR    2025250     91400   17.8600 -113.7000       7.4       352       138        60
OIR    2025250     91400   17.8600 -113.7100       7.4       352       139        60
OIR    2025250     91400   17.8600 -113.7200       7.4       352       137        60
OIR    2025250     91400   17.8600 -113.7300       7.4       352       136        60
OIR    2025250     91400   17.8600 -113.7400       7.4       353       138        60
OIR    2025250     91400   17.8600 -113.7500       7.4       354       140        60
OIR    2025250     91400   17.8600 -113.7600       7.2       358       140        60
OIR    2025250     91400   17.8600 -113.7700       6.7         2       141        60
OIR    2025250     91400   17.8600 -113.7800       6.6         3       141        60
OIR    2025250     91400   17.8600 -113.7900       6.5         3       141        60
OIR    2025250     91400   17.8600 -113.8000       6.5         3       141        60
OIR    2025250     91400   17.8600 -113.8100       6.4         3       140        60
OIR    2025250     91400   17.8600 -113.8200       6.4         4       138        60
OIR    2025250     91400   17.8600 -113.8300       6.2         6       138        60
OIR    2025250     91400   17.8600 -113.8400       6.0         8       137        60
OIR    2025250     91400   17.8600 -113.8500       5.9         9       136        60
OIR    2025250     91400   17.8600 -113.8600       5.7        10       134        60
OIR    2025250     91400   17.8600 -113.8700       5.5        11       135        60
OIR    2025250     91400   17.8600 -113.8800       5.3        13       138        60
OIR    2025250     91400   17.8600 -113.8900       5.1        14       140        60
OIR    2025250     91400   17.8600 -113.9000       4.8        14       141        60
OIR    2025250     91400   17.8600 -113.9100       4.8        14       143        60
OIR    2025250     91400   17.8600 -113.9800       4.7        15       142        60
OIR    2025250     91400   17.8600 -113.9900       4.8        14       142        60
OIR    2025250     91400   17.8600 -114.0000       4.8        14       142        60
OIR    2025250     91400   17.8500 -110.5700      16.3        54       143        60
OIR    2025250     91400   17.8500 -110.5800      16.3        54       141        60
OIR    2025250     91400   17.8500 -110.5900      16.3        54       140        60
OIR    2025250     91400   17.8500 -110.6000      16.3        54       138        60
OIR    2025250     91400   17.8500 -110.6100      16.3        54       135        60
OIR    2025250     91400   17.8500 -110.6200      16.3        54       135        60
OIR    2025250     91400   17.8500 -110.6300      16.2        54       135        60
OIR    2025250     91400   17.8500 -110.6400      16.2        54       136        60
OIR    2025250     91400   17.8500 -110.6500      16.1        54       137        60
OIR    2025250     91400   17.8500 -110.6600      16.1        54       139        60
OIR    2025250     91400   17.8500 -110.6700      16.0        54       139        60
OIR    2025250     91400   17.8500 -110.6800      16.0        54       138        60
OIR    2025250     91400   17.8500 -110.6900      15.9        55       140        60
OIR    2025250     91400   17.8500 -111.5200      13.7        65       141        60
OIR    2025250     91400   17.8500 -111.5300      13.5        65       135        60
OIR    2025250     91400   17.8500 -111.5400      13.5        65       131        60
OIR    2025250     91400   17.8500 -111.5500      13.5        65       131        60
OIR    2025250     91400   17.8500 -111.5600      13.5        65       130        60
OIR    2025250     91400   17.8500 -111.5700      13.4        65       131        60
OIR    2025250     91400   17.8500 -111.5800      13.4        65       132        60
OIR    2025250     91400   17.8500 -111.5900      13.4        65       132        60
OIR    2025250     91400   17.8500 -111.6000      13.4        65       132        60
OIR    2025250     91400   17.8500 -111.6100      13.3        64       131        60
OIR    2025250     91400   17.8500 -111.6200      13.2        63       131        60
OIR    2025250     91400   17.8500 -111.6300      13.2        63       131        60
OIR    2025250     91400   17.8500 -111.6400      13.1        62       130        60
OIR    2025250     91400   17.8500 -111.6500      13.1        62       129        60
OIR    2025250     91400   17.8500 -111.6600      13.1        62       129        60
OIR    2025250     91400   17.8500 -111.6700      13.1        62       130        60
OIR    2025250     91400   17.8500 -111.6800      13.1        62       132        60
OIR    2025250     91400   17.8500 -111.6900      13.1        61       133        60
OIR    2025250     91400   17.8500 -111.7000      13.3        61       135        60
OIR    2025250     91400   17.8500 -111.7100      13.4        60       136        60
OIR    2025250     91400   17.8500 -111.7200      13.4        60       136        60
OIR    2025250     91400   17.8500 -111.7300      13.5        59       135        60
OIR    2025250     91400   17.8500 -111.7400      13.5        59       133        60
OIR    2025250     91400   17.8500 -111.7500      13.4        59       131        60
OIR    2025250     91400   17.8500 -111.7600      13.4        59       130        60
OIR    2025250     91400   17.8500 -111.7700      13.4        59       129        60
OIR    2025250     91400   17.8500 -111.7800      13.3        59       131        60
OIR    2025250     91400   17.8500 -111.7900      13.3        59       132        60
OIR    2025250     91400   17.8500 -111.8000      13.3        59       133        60
OIR    2025250     91400   17.8500 -111.8100      13.3        59       133        60
OIR    2025250     91400   17.8500 -111.8200      13.3        59       134        60
OIR    2025250     91400   17.8500 -111.8300      13.3        59       135        60
OIR    2025250     91400   17.8500 -111.8400      13.2        59       135        60
OIR    2025250     91400   17.8500 -111.8500      13.2        59       134        60
OIR    2025250     91400   17.8500 -111.8600      13.2        59       132        60
OIR    2025250     91400   17.8500 -111.8700      13.2        58       131        60
OIR    2025250     91400   17.8500 -111.8800      13.2        58       132        60
OIR    2025250     91400   17.8500 -111.8900      13.2        58       132        60
OIR    2025250     91400   17.8500 -111.9000      13.2        58       132        60
OIR    2025250     91400   17.8500 -111.9100      13.2        58       132        60
OIR    2025250     91400   17.8500 -111.9200      13.2        58       132        60
OIR    2025250     91400   17.8500 -111.9300      13.2        58       131        60
OIR    2025250     91400   17.8500 -111.9400      13.2        58       131        60
OIR    2025250     91400   17.8500 -111.9500      13.2        58       130        60
OIR    2025250     91400   17.8500 -111.9600      13.3        57       129        60
OIR    2025250     91400   17.8500 -111.9700      13.3        57       131        60
OIR    2025250     91400   17.8500 -111.9800      13.3        56       132        60
OIR    2025250     91400   17.8500 -111.9900      13.3        55       130        60
OIR    2025250     91400   17.8500 -112.0000      13.5        55       129        60
OIR    2025250     91400   17.8500 -112.0100      13.6        55       128        60
OIR    2025250     91400   17.8500 -112.0200      13.7        54       127        60
OIR    2025250     91400   17.8500 -112.0300      13.8        54       128        60
OIR    2025250     91400   17.8500 -112.0400      13.9        53       130        60
OIR    2025250     91400   17.8500 -112.0500      13.9        52       132        60
OIR    2025250     91400   17.8500 -112.0600      14.0        52       131        60
OIR    2025250     91400   17.8500 -112.0700      14.0        51       131        60
OIR    2025250     91400   17.8500 -112.0800      14.0        51       129        60
OIR    2025250     91400   17.8500 -112.0900      14.0        50       127        60
OIR    2025250     91400   17.8500 -112.1000      14.0        50       126        60
OIR    2025250     91400   17.8500 -112.1100      14.0        49       126        60
OIR    2025250     91400   17.8500 -112.1200      14.0        49       126        60
OIR    2025250     91400   17.8500 -112.1300      14.0        48       124        60
OIR    2025250     91400   17.8500 -112.1400      14.0        48       122        60
OIR    2025250     91400   17.8500 -112.1500      14.0        48       121        60
OIR    2025250     91400   17.8500 -112.1600      14.0        47       122        60
OIR    2025250     91400   17.8500 -112.1700      13.9        47       122        60
OIR    2025250     91400   17.8500 -112.1800      13.8        47       123        60
OIR    2025250     91400   17.8500 -112.1900      13.7        47       123        60
OIR    2025250     91400   17.8500 -112.2000      13.5        46       122        60
OIR    2025250     91400   17.8500 -112.2100      13.1        46       122        60
OIR    2025250     91400   17.8500 -112.2200      12.0        44       120        60
OIR    2025250     91400   17.8500 -112.2300      10.8        40       117        60
OIR    2025250     91400   17.8500 -112.2400      10.5        40       116        60
OIR    2025250     91400   17.8500 -112.2500      10.5        40       114        60
OIR    2025250     91400   17.8500 -112.2600      10.4        40       112        60
OIR    2025250     91400   17.8500 -112.2700      10.4        39       113        60
OIR    2025250     91400   17.8500 -112.2800      10.4        39       113        60
OIR    2025250     91400   17.8500 -112.2900      10.4        39       111        60
OIR    2025250     91400   17.8500 -112.3000      10.4        39       109        60
OIR    2025250     91400   17.8500 -112.3100      10.4        39       108        60
OIR    2025250     91400   17.8500 -112.3200      10.4        39       107        60
OIR    2025250     91400   17.8500 -112.3300      10.5        38       105        60
OIR    2025250     91400   17.8500 -112.3400      10.6        37       105        60
OIR    2025250     91400   17.8500 -112.3500      10.7        36       104        60
OIR    2025250     91400   17.8500 -112.3600      10.9        35       104        60
OIR    2025250     91400   17.8500 -112.3700      10.9        34       104        60
OIR    2025250     91400   17.8500 -112.3800      10.9        34       104        60
OIR    2025250     91400   17.8500 -112.3900      10.6        34       105        60
OIR    2025250     91400   17.8500 -112.4000      11.4        39       105        60
OIR    2025250     91400   17.8500 -112.4100      27.8        56       104        60
OIR    2025250     91400   17.8500 -112.4200      44.9        50       104        60
OIR    2025250     91400   17.8500 -112.4300      33.4       338       104        60
OIR    2025250     91400   17.8500 -112.4400      39.8       342       103        60
OIR    2025250     91400   17.8500 -112.4600      64.4       303       103        60
OIR    2025250     91400   17.8500 -112.4700      32.6       297       103        60
OIR    2025250     91400   17.8500 -112.4800       4.9        61       103        60
OIR    2025250     91400   17.8500 -112.4900       5.2        76       103        60
OIR    2025250     91400   17.8500 -112.5000       5.0        77       103        60
OIR    2025250     91400   17.8500 -112.5100       5.0        77       103        60
OIR    2025250     91400   17.8500 -112.5200       5.0        76       103        60
OIR    2025250     91400   17.8500 -112.5300       5.0        75       104        60
OIR    2025250     91400   17.8500 -112.5400       4.9        74       104        60
OIR    2025250     91400   17.8500 -112.5500       4.9        72       105        60
OIR    2025250     91400   17.8500 -112.5600       4.7        68       107        60
OIR    2025250     91400   17.8500 -112.5700       4.1        55       105        60
OIR    2025250     91400   17.8500 -112.6700       4.4        24       116        60
OIR    2025250     91400   17.8500 -112.6800       4.9        26       116        60
OIR    2025250     91400   17.8500 -112.6900       5.2        28       115        60
OIR    2025250     91400   17.8500 -112.7000       5.3        29       114        60
OIR    2025250     91400   17.8500 -112.7100       5.2        29       113        60
OIR    2025250     91400   17.8500 -112.7200       5.0        30       113        60
OIR    2025250     91400   17.8500 -112.7300       4.9        30       112        60
OIR    2025250     91400   17.8500 -112.7400       4.7        30       112        60
OIR    2025250     91400   17.8500 -112.7500       4.7        30       114        60
OIR    2025250     91400   17.8500 -112.7600       4.7        29       117        60
OIR    2025250     91400   17.8500 -112.7700       4.7        28       121        60
OIR    2025250     91400   17.8500 -112.7800       4.7        28       121        60
OIR    2025250     91400   17.8500 -112.7900       4.7        29       121        60
OIR    2025250     91400   17.8500 -112.8000       4.6        29       120        60
OIR    2025250     91400   17.8500 -112.8100       4.6        30       119        60
OIR    2025250     91400   17.8500 -112.8200       4.5        30       117        60
OIR    2025250     91400   17.8500 -112.8300       4.5        30       116        60
OIR    2025250     91400   17.8500 -112.8400       4.5        30       116        60
OIR    2025250     91400   17.8500 -112.8500       4.5        30       119        60
OIR    2025250     91400   17.8500 -112.8600       4.4        30       122        60
OIR    2025250     91400   17.8500 -112.8700       4.3        31       123        60
OIR    2025250     91400   17.8500 -113.2700       4.1        96       119        60
OIR    2025250     91400   17.8500 -113.2800       4.1        97       122        60
OIR    2025250     91400   17.8500 -113.2900       4.1        97       124        60
OIR    2025250     91400   17.8500 -113.3000       4.1        97       125        60
OIR    2025250     91400   17.8500 -113.3100       4.1        98       124        60
OIR    2025250     91400   17.8500 -113.4700       8.2       357       142        60
OIR    2025250     91400   17.8500 -113.4800       8.2       357       139        60
OIR    2025250     91400   17.8500 -113.4900       8.2       357       139        60
OIR    2025250     91400   17.8500 -113.5000       8.2       357       138        60
OIR    2025250     91400   17.8500 -113.5100       8.2       357       137        60
OIR    2025250     91400   17.8500 -113.5200       8.2       357       136        60
OIR    2025250     91400   17.8500 -113.5300       8.1       357       137        60
OIR    2025250     91400   17.8500 -113.5400       8.1       356       138        60
OIR    2025250     91400   17.8500 -113.5500       8.1       356       139        60
OIR    2025250     91400   17.8500 -113.5600       8.0       356       136        60
OIR    2025250     91400   17.8500 -113.5700       7.9       356       134        60
OIR    2025250     91400   17.8500 -113.5800       7.8       355       140        60
OIR    2025250     91400   17.8500 -113.6200       7.6       353       144        60
OIR    2025250     91400   17.8500 -113.6300       7.6       353       140        60
OIR    2025250     91400   17.8500 -113.6400       7.5       352       137        60
OIR    2025250     91400   17.8500 -113.6500       7.5       352       138        60
OIR    2025250     91400   17.8500 -113.6600       7.5       352       139        60
OIR    2025250     91400   17.8500 -113.6700       7.5       352       137        60
OIR    2025250     91400   17.8500 -113.6800       7.4       352       135        60
OIR    2025250     91400   17.8500 -113.6900       7.4       352       135        60
OIR    2025250     91400   17.8500 -113.7000       7.4       352       137        60
OIR    2025250     91400   17.8500 -113.7100       7.4       352       138        60
OIR    2025250     91400   17.8500 -113.7200       7.4       352       135        60
OIR    2025250     91400   17.8500 -113.7300       7.4       352       133        60
OIR    2025250     91400   17.8500 -113.7400       7.4       353       134        60
OIR    2025250     91400   17.8500 -113.7500       7.3       354       136        60
OIR    2025250     91400   17.8500 -113.7600       7.1       357       138        60
OIR    2025250     91400   17.8500 -113.7700       6.7         1       140        60
OIR    2025250     91400   17.8500 -113.7800       6.6         3       140        60
OIR    2025250     91400   17.8500 -113.7900       6.6         3       140        60
OIR    2025250     91400   17.8500 -113.8000       6.5         3       139        60
OIR    2025250     91400   17.8500 -113.8100       6.5         3       138        60
OIR    2025250     91400   17.8500 -113.8200       6.5         4       137        60
OIR    2025250     91400   17.8500 -113.8300       6.3         5       138        60
OIR    2025250     91400   17.8500 -113.8400       6.1         7       140        60
OIR    2025250     91400   17.8500 -113.8500       5.9         8       138        60
OIR    2025250     91400   17.8500 -113.8600       5.8         9       135        60
OIR    2025250     91400   17.8500 -113.8700       5.6        10       134        60
OIR    2025250     91400   17.8500 -113.8800       5.4        12       137        60
OIR    2025250     91400   17.8500 -113.8900       5.0        13       140        60
OIR    2025250     91400   17.8500 -113.9000       4.9        13       140        60
OIR    2025250     91400   17.8500 -113.9100       4.8        13       139        60
OIR    2025250     91400   17.8500 -113.9200       4.8        14       141        60
OIR    2025250     91400   17.8500 -113.9300       4.9        14       143        60
OIR    2025250     91400   17.8500 -113.9600       5.0        14       143        60
OIR    2025250     91400   17.8500 -113.9700       5.0        14       140        60
OIR    2025250     91400   17.8500 -113.9800       5.0        14       138        60
OIR    2025250     91400   17.8500 -113.9900       4.9        14       137        60
OIR    2025250     91400   17.8500 -114.0000       4.9        14       136        60
OIR    2025250     91400   17.8500 -114.0100       4.8        14       140        60
OIR    2025250     91400   17.8500 -114.0900       4.5       347       143        60
OIR    2025250     91400   17.8500 -114.1000       4.4       344       142        60
OIR    2025250     91400   17.8500 -114.1100       4.4       343       142        60
OIR    2025250     91400   17.8400 -110.5800      16.3        54       142        60
OIR    2025250     91400   17.8400 -110.5900      16.3        54       141        60
OIR    2025250     91400   17.8400 -110.6000      16.3        54       139        60
OIR    2025250     91400   17.8400 -110.6100      16.3        54       137        60
OIR    2025250     91400   17.8400 -110.6200      16.2        54       136        60
OIR    2025250     91400   17.8400 -110.6300      16.2        54       136        60
OIR    2025250     91400   17.8400 -110.6400      16.2        54       137        60
OIR    2025250     91400   17.8400 -110.6500      16.1        54       138        60
OIR    2025250     91400   17.8400 -110.6600      16.0        54       139        60
OIR    2025250     91400   17.8400 -110.6700      15.9        54       140        60
OIR    2025250     91400   17.8400 -110.6800      15.9        55       141        60
OIR    2025250     91400   17.8400 -110.6900      15.8        55       143        60
OIR    2025250     91400   17.8400 -110.8500      15.6        58       144        60
OIR    2025250     91400   17.8400 -110.8600      15.6        58       143        60
OIR    2025250     91400   17.8400 -111.5200      13.6        65       144        60
OIR    2025250     91400   17.8400 -111.5300      13.5        65       137        60
OIR    2025250     91400   17.8400 -111.5400      13.5        65       133        60
OIR    2025250     91400   17.8400 -111.5500      13.5        65       133        60
OIR    2025250     91400   17.8400 -111.5600      13.5        65       133        60
OIR    2025250     91400   17.8400 -111.5700      13.4        65       133        60
OIR    2025250     91400   17.8400 -111.5800      13.4        65       134        60
OIR    2025250     91400   17.8400 -111.5900      13.4        65       134        60
OIR    2025250     91400   17.8400 -111.6000      13.3        64       132        60
OIR    2025250     91400   17.8400 -111.6100      13.3        63       132        60
OIR    2025250     91400   17.8400 -111.6200      13.2        63       132        60
OIR    2025250     91400   17.8400 -111.6300      13.2        62       132        60
OIR    2025250     91400   17.8400 -111.6400      13.2        62       131        60
OIR    2025250     91400   17.8400 -111.6500      13.1        62       129        60
OIR    2025250     91400   17.8400 -111.6600      13.1        62       130        60
OIR    2025250     91400   17.8400 -111.6700      13.1        62       132        60
OIR    2025250     91400   17.8400 -111.6800      13.2        61       134        60
OIR    2025250     91400   17.8400 -111.6900      13.3        61       136        60
OIR    2025250     91400   17.8400 -111.7000      13.4        60       138        60
OIR    2025250     91400   17.8400 -111.7100      13.5        59       138        60
OIR    2025250     91400   17.8400 -111.7200      13.5        59       136        60
OIR    2025250     91400   17.8400 -111.7300      13.5        59       136        60
OIR    2025250     91400   17.8400 -111.7400      13.5        59       136        60
OIR    2025250     91400   17.8400 -111.7500      13.5        59       136        60
OIR    2025250     91400   17.8400 -111.7600      13.4        59       135        60
OIR    2025250     91400   17.8400 -111.7700      13.4        59       134        60
OIR    2025250     91400   17.8400 -111.7800      13.4        59       133        60
OIR    2025250     91400   17.8400 -111.7900      13.4        59       132        60
OIR    2025250     91400   17.8400 -111.8000      13.4        58       133        60
OIR    2025250     91400   17.8400 -111.8100      13.4        58       134        60
OIR    2025250     91400   17.8400 -111.8200      13.4        59       135        60
OIR    2025250     91400   17.8400 -111.8300      13.3        59       134        60
OIR    2025250     91400   17.8400 -111.8400      13.3        59       133        60
OIR    2025250     91400   17.8400 -111.8500      13.3        59       132        60
OIR    2025250     91400   17.8400 -111.8600      13.3        59       132        60
OIR    2025250     91400   17.8400 -111.8700      13.3        58       131        60
OIR    2025250     91400   17.8400 -111.8800      13.3        58       131        60
OIR    2025250     91400   17.8400 -111.8900      13.3        58       131        60
OIR    2025250     91400   17.8400 -111.9000      13.3        58       132        60
OIR    2025250     91400   17.8400 -111.9100      13.3        58       132        60
OIR    2025250     91400   17.8400 -111.9200      13.3        58       132        60
OIR    2025250     91400   17.8400 -111.9300      13.3        58       131        60
OIR    2025250     91400   17.8400 -111.9400      13.3        57       130        60
OIR    2025250     91400   17.8400 -111.9500      13.3        57       130        60
OIR    2025250     91400   17.8400 -111.9600      13.4        57       129        60
OIR    2025250     91400   17.8400 -111.9700      13.5        56       130        60
OIR    2025250     91400   17.8400 -111.9800      13.4        55       131        60
OIR    2025250     91400   17.8400 -111.9900      13.6        54       131        60
OIR    2025250     91400   17.8400 -112.0000      13.8        53       129        60
OIR    2025250     91400   17.8400 -112.0100      13.9        52       128        60
OIR    2025250     91400   17.8400 -112.0200      14.0        52       128        60
OIR    2025250     91400   17.8400 -112.0300      14.1        51       128        60
OIR    2025250     91400   17.8400 -112.0400      14.1        51       130        60
OIR    2025250     91400   17.8400 -112.0500      14.2        51       133        60
OIR    2025250     91400   17.8400 -112.0600      14.2        51       133        60
OIR    2025250     91400   17.8400 -112.0700      14.2        50       131        60
OIR    2025250     91400   17.8400 -112.0800      14.2        50       130        60
OIR    2025250     91400   17.8400 -112.0900      14.1        50       128        60
OIR    2025250     91400   17.8400 -112.1000      14.1        49       126        60
OIR    2025250     91400   17.8400 -112.1100      14.1        49       126        60
OIR    2025250     91400   17.8400 -112.1200      14.0        49       125        60
OIR    2025250     91400   17.8400 -112.1300      14.0        48       124        60
OIR    2025250     91400   17.8400 -112.1400      14.0        48       122        60
OIR    2025250     91400   17.8400 -112.1500      14.0        48       121        60
OIR    2025250     91400   17.8400 -112.1600      14.0        47       121        60
OIR    2025250     91400   17.8400 -112.1700      13.9        47       121        60
OIR    2025250     91400   17.8400 -112.1800      13.9        47       121        60
OIR    2025250     91400   17.8400 -112.1900      13.8        47       122        60
OIR    2025250     91400   17.8400 -112.2000      13.6        46       121        60
OIR    2025250     91400   17.8400 -112.2100      13.3        46       121        60
OIR    2025250     91400   17.8400 -112.2200      12.5        45       120        60
OIR    2025250     91400   17.8400 -112.2300      11.3        41       119        60
OIR    2025250     91400   17.8400 -112.2400      10.7        40       116        60
OIR    2025250     91400   17.8400 -112.2500      10.6        40       115        60
OIR    2025250     91400   17.8400 -112.2600      10.5        40       112        60
OIR    2025250     91400   17.8400 -112.2700      10.4        40       112        60
OIR    2025250     91400   17.8400 -112.2800      10.4        39       112        60
OIR    2025250     91400   17.8400 -112.2900      10.4        39       111        60
OIR    2025250     91400   17.8400 -112.3000      10.4        39       110        60
OIR    2025250     91400   17.8400 -112.3100      10.4        39       108        60
OIR    2025250     91400   17.8400 -112.3200      10.5        38       108        60
OIR    2025250     91400   17.8400 -112.3300      10.7        37       107        60
OIR    2025250     91400   17.8400 -112.3400      10.9        36       105        60
OIR    2025250     91400   17.8400 -112.3500      11.0        35       105        60
OIR    2025250     91400   17.8400 -112.3600      11.1        34       105        60
OIR    2025250     91400   17.8400 -112.3700      11.1        33       105        60
OIR    2025250     91400   17.8400 -112.3800      11.1        33       105        60
OIR    2025250     91400   17.8400 -112.3900      11.1        32       105        60
OIR    2025250     91400   17.8400 -112.4000      12.3        32       105        60
OIR    2025250     91400   17.8400 -112.4100      35.5        34       104        60
OIR    2025250     91400   17.8400 -112.4500      69.5       339       103        60
OIR    2025250     91400   17.8400 -112.4600      68.7       298       103        60
OIR    2025250     91400   17.8400 -112.4700      39.5       285       103        60
OIR    2025250     91400   17.8400 -112.4900       5.9        90       104        60
OIR    2025250     91400   17.8400 -112.5000       5.8        86       104        60
OIR    2025250     91400   17.8400 -112.5100       5.1        78       104        60
OIR    2025250     91400   17.8400 -112.5200       5.1        75       104        60
OIR    2025250     91400   17.8400 -112.5300       5.1        73       104        60
OIR    2025250     91400   17.8400 -112.5400       5.0        71       104        60
OIR    2025250     91400   17.8400 -112.5500       4.9        67       105        60
OIR    2025250     91400   17.8400 -112.5600       4.7        57       107        60
OIR    2025250     91400   17.8400 -112.5700       4.3        42       105        60
OIR    2025250     91400   17.8400 -112.5800       4.1        32       104        60
OIR    2025250     91400   17.8400 -112.6500       4.3        21       116        60
OIR    2025250     91400   17.8400 -112.6600       4.8        22       116        60
OIR    2025250     91400   17.8400 -112.6700       5.5        24       116        60
OIR    2025250     91400   17.8400 -112.6800       5.9        25       116        60
OIR    2025250     91400   17.8400 -112.6900       6.0        26       115        60
OIR    2025250     91400   17.8400 -112.7000       6.0        27       114        60
OIR    2025250     91400   17.8400 -112.7100       5.8        28       113        60
OIR    2025250     91400   17.8400 -112.7200       5.6        28       112        60
OIR    2025250     91400   17.8400 -112.7300       5.4        28       112        60
OIR    2025250     91400   17.8400 -112.7400       5.1        29       112        60
OIR    2025250     91400   17.8400 -112.7500       5.0        29       113        60
OIR    2025250     91400   17.8400 -112.7600       4.9        29       117        60
OIR    2025250     91400   17.8400 -112.7700       4.8        29       121        60
OIR    2025250     91400   17.8400 -112.7800       4.7        29       120        60
OIR    2025250     91400   17.8400 -112.7900       4.7        29       120        60
OIR    2025250     91400   17.8400 -112.8000       4.7        29       120        60
OIR    2025250     91400   17.8400 -112.8100       4.6        30       120        60
OIR    2025250     91400   17.8400 -112.8200       4.6        30       117        60
OIR    2025250     91400   17.8400 -112.8300       4.5        30       116        60
OIR    2025250     91400   17.8400 -112.8400       4.5        30       116        60
OIR    2025250     91400   17.8400 -112.8500       4.5        30       116        60
OIR    2025250     91400   17.8400 -112.8600       4.4        31       117        60
OIR    2025250     91400   17.8400 -112.8700       4.4        31       121        60
OIR    2025250     91400   17.8400 -112.8800       4.1        31       124        60
OIR    2025250     91400   17.8400 -112.8900       4.0        32       124        60
OIR    2025250     91400   17.8400 -112.9000       4.0        33       124        60
OIR    2025250     91400   17.8400 -113.2700       4.0        96       120        60
OIR    2025250     91400   17.8400 -113.2800       4.0        97       122        60
OIR    2025250     91400   17.8400 -113.2900       4.1        98       124        60
OIR    2025250     91400   17.8400 -113.3000       4.0        98       124        60
OIR    2025250     91400   17.8400 -113.3800       4.2         7       142        60
OIR    2025250     91400   17.8400 -113.4500       8.1       357       143        60
OIR    2025250     91400   17.8400 -113.4600       8.2       357       141        60
OIR    2025250     91400   17.8400 -113.4700       8.2       357       137        60
OIR    2025250     91400   17.8400 -113.4800       8.2       357       134        60
OIR    2025250     91400   17.8400 -113.4900       8.2       357       133        60
OIR    2025250     91400   17.8400 -113.5000       8.2       357       133        60
OIR    2025250     91400   17.8400 -113.5100       8.2       357       134        60
OIR    2025250     91400   17.8400 -113.5200       8.2       357       136        60
OIR    2025250     91400   17.8400 -113.5300       8.2       357       138        60
OIR    2025250     91400   17.8400 -113.5400       8.2       357       138        60
OIR    2025250     91400   17.8400 -113.5500       8.1       356       138        60
OIR    2025250     91400   17.8400 -113.5600       8.1       356       138        60
OIR    2025250     91400   17.8400 -113.5700       8.0       356       138        60
OIR    2025250     91400   17.8400 -113.5800       8.0       356       142        60
OIR    2025250     91400   17.8400 -113.6200       7.7       353       142        60
OIR    2025250     91400   17.8400 -113.6300       7.6       353       138        60
OIR    2025250     91400   17.8400 -113.6400       7.6       352       134        60
OIR    2025250     91400   17.8400 -113.6500       7.5       352       137        60
OIR    2025250     91400   17.8400 -113.6600       7.5       352       141        60
OIR    2025250     91400   17.8400 -113.6700       7.5       352       139        60
OIR    2025250     91400   17.8400 -113.6800       7.5       352       137        60
OIR    2025250     91400   17.8400 -113.6900       7.4       352       136        60
OIR    2025250     91400   17.8400 -113.7000       7.4       352       138        60
OIR    2025250     91400   17.8400 -113.7100       7.4       352       137        60
OIR    2025250     91400   17.8400 -113.7200       7.4       352       135        60
OIR    2025250     91400   17.8400 -113.7300       7.4       352       132        60
OIR    2025250     91400   17.8400 -113.7400       7.3       352       132        60
OIR    2025250     91400   17.8400 -113.7500       7.2       353       132        60
OIR    2025250     91400   17.8400 -113.7600       7.0       357       136        60
OIR    2025250     91400   17.8400 -113.7700       6.6         2       141        60
OIR    2025250     91400   17.8400 -113.7800       6.6         2       143        60
OIR    2025250     91400   17.8400 -113.7900       6.6         3       140        60
OIR    2025250     91400   17.8400 -113.8000       6.6         3       138        60
OIR    2025250     91400   17.8400 -113.8100       6.6         3       138        60
OIR    2025250     91400   17.8400 -113.8200       6.6         3       137        60
OIR    2025250     91400   17.8400 -113.8300       6.5         5       137        60
OIR    2025250     91400   17.8400 -113.8400       6.3         6       138        60
OIR    2025250     91400   17.8400 -113.8500       6.1         7       138        60
OIR    2025250     91400   17.8400 -113.8600       6.0         8       137        60
OIR    2025250     91400   17.8400 -113.8700       5.9        10       137        60
OIR    2025250     91400   17.8400 -113.8800       5.6        11       140        60
OIR    2025250     91400   17.8400 -113.8900       5.2        13       143        60
OIR    2025250     91400   17.8400 -113.9000       4.9        13       142        60
OIR    2025250     91400   17.8400 -113.9100       4.9        13       140        60
OIR    2025250     91400   17.8400 -113.9200       4.9        13       141        60
OIR    2025250     91400   17.8400 -113.9300       4.9        14       143        60
OIR    2025250     91400   17.8400 -113.9400       5.0        14       143        60
OIR    2025250     91400   17.8400 -113.9500       5.0        14       143        60
OIR    2025250     91400   17.8400 -113.9600       5.0        14       143        60
OIR    2025250     91400   17.8400 -113.9700       5.0        14       140        60
OIR    2025250     91400   17.8400 -113.9800       5.0        14       138        60
OIR    2025250     91400   17.8400 -113.9900       5.0        14       137        60
OIR    2025250     91400   17.8400 -114.0000       5.1        14       137        60
OIR    2025250     91400   17.8400 -114.0100       5.1        13       140        60
OIR    2025250     91400   17.8400 -114.1000       4.7       345       141        60
OIR    2025250     91400   17.8400 -114.1100       4.6       343       138        60
OIR    2025250     91400   17.8400 -114.1200       4.5       343       139        60
OIR    2025250     91400   17.8400 -114.1300       4.5       343       143        60
OIR    2025250     91400   17.8300 -110.5800      16.3        54       142        60
OIR    2025250     91400   17.8300 -110.5900      16.3        54       141        60
OIR    2025250     91400   17.8300 -110.6000      16.3        54       139        60
OIR    2025250     91400   17.8300 -110.6100      16.3        54       137        60
OIR    2025250     91400   17.8300 -110.6200      16.2        54       135        60
OIR    2025250     91400   17.8300 -110.6300      16.2        54       135        60
OIR    2025250     91400   17.8300 -110.6400      16.1        54       136        60
OIR    2025250     91400   17.8300 -110.6500      16.0        54       136        60
OIR    2025250     91400   17.8300 -110.6600      15.9        54       137        60
OIR    2025250     91400   17.8300 -110.6700      15.8        54       138        60
OIR    2025250     91400   17.8300 -110.6800      15.8        55       142        60
OIR    2025250     91400   17.8300 -110.8500      15.5        59       143        60
OIR    2025250     91400   17.8300 -110.8600      15.6        59       141        60
OIR    2025250     91400   17.8300 -110.8700      15.6        58       143        60
OIR    2025250     91400   17.8300 -110.9000      14.5        56       143        60
OIR    2025250     91400   17.8300 -111.5300      13.5        65       143        60
OIR    2025250     91400   17.8300 -111.5400      13.5        65       137        60
OIR    2025250     91400   17.8300 -111.5500      13.5        65       137        60
OIR    2025250     91400   17.8300 -111.5600      13.4        65       137        60
OIR    2025250     91400   17.8300 -111.5700      13.4        65       137        60
OIR    2025250     91400   17.8300 -111.5800      13.4        65       137        60
OIR    2025250     91400   17.8300 -111.5900      13.4        64       137        60
OIR    2025250     91400   17.8300 -111.6000      13.3        63       135        60
OIR    2025250     91400   17.8300 -111.6100      13.3        63       132        60
OIR    2025250     91400   17.8300 -111.6200      13.2        62       132        60
OIR    2025250     91400   17.8300 -111.6300      13.2        62       132        60
OIR    2025250     91400   17.8300 -111.6400      13.2        62       131        60
OIR    2025250     91400   17.8300 -111.6500      13.2        62       130        60
OIR    2025250     91400   17.8300 -111.6600      13.2        62       129        60
OIR    2025250     91400   17.8300 -111.6700      13.2        61       132        60
OIR    2025250     91400   17.8300 -111.6800      13.3        61       135        60
OIR    2025250     91400   17.8300 -111.6900      13.4        60       138        60
OIR    2025250     91400   17.8300 -111.7000      13.4        59       141        60
OIR    2025250     91400   17.8300 -111.7100      13.5        59       140        60
OIR    2025250     91400   17.8300 -111.7200      13.5        59       139        60
OIR    2025250     91400   17.8300 -111.7300      13.5        59       137        60
OIR    2025250     91400   17.8300 -111.7400      13.5        59       138        60
OIR    2025250     91400   17.8300 -111.7500      13.5        59       139        60
OIR    2025250     91400   17.8300 -111.7600      13.5        59       139        60
OIR    2025250     91400   17.8300 -111.7700      13.5        59       138        60
OIR    2025250     91400   17.8300 -111.7800      13.4        59       136        60
OIR    2025250     91400   17.8300 -111.7900      13.4        58       133        60
OIR    2025250     91400   17.8300 -111.8000      13.4        58       133        60
OIR    2025250     91400   17.8300 -111.8100      13.4        58       134        60
OIR    2025250     91400   17.8300 -111.8200      13.4        59       136        60
OIR    2025250     91400   17.8300 -111.8300      13.4        59       134        60
OIR    2025250     91400   17.8300 -111.8400      13.4        59       132        60
OIR    2025250     91400   17.8300 -111.8500      13.4        59       131        60
OIR    2025250     91400   17.8300 -111.8600      13.4        58       131        60
OIR    2025250     91400   17.8300 -111.8700      13.4        58       131        60
OIR    2025250     91400   17.8300 -111.8800      13.4        58       130        60
OIR    2025250     91400   17.8300 -111.8900      13.3        58       130        60
OIR    2025250     91400   17.8300 -111.9000      13.3        58       131        60
OIR    2025250     91400   17.8300 -111.9100      13.3        58       132        60
OIR    2025250     91400   17.8300 -111.9200      13.4        58       132        60
OIR    2025250     91400   17.8300 -111.9300      13.4        57       130        60
OIR    2025250     91400   17.8300 -111.9400      13.4        57       129        60
OIR    2025250     91400   17.8300 -111.9500      13.5        56       129        60
OIR    2025250     91400   17.8300 -111.9600      13.6        56       129        60
OIR    2025250     91400   17.8300 -111.9700      13.7        54       130        60
OIR    2025250     91400   17.8300 -111.9800      13.8        52       131        60
OIR    2025250     91400   17.8300 -111.9900      14.0        51       131        60
OIR    2025250     91400   17.8300 -112.0000      14.1        51       130        60
OIR    2025250     91400   17.8300 -112.0100      14.2        50       129        60
OIR    2025250     91400   17.8300 -112.0200      14.3        50       129        60
OIR    2025250     91400   17.8300 -112.0300      14.3        50       129        60
OIR    2025250     91400   17.8300 -112.0400      14.3        50       130        60
OIR    2025250     91400   17.8300 -112.0500      14.4        50       132        60
OIR    2025250     91400   17.8300 -112.0600      14.4        50       131        60
OIR    2025250     91400   17.8300 -112.0700      14.3        50       130        60
OIR    2025250     91400   17.8300 -112.0800      14.3        49       129        60
OIR    2025250     91400   17.8300 -112.0900      14.2        49       128        60
OIR    2025250     91400   17.8300 -112.1000      14.2        49       127        60
OIR    2025250     91400   17.8300 -112.1100      14.2        49       126        60
OIR    2025250     91400   17.8300 -112.1200      14.1        48       125        60
OIR    2025250     91400   17.8300 -112.1300      14.1        48       124        60
OIR    2025250     91400   17.8300 -112.1400      14.0        48       123        60
OIR    2025250     91400   17.8300 -112.1500      14.0        48       122        60
OIR    2025250     91400   17.8300 -112.1600      14.0        47       122        60
OIR    2025250     91400   17.8300 -112.1700      13.9        47       122        60
OIR    2025250     91400   17.8300 -112.1800      13.9        47       122        60
OIR    2025250     91400   17.8300 -112.1900      13.8        47       122        60
OIR    2025250     91400   17.8300 -112.2000      13.6        47       122        60
OIR    2025250     91400   17.8300 -112.2100      13.3        46       121        60
OIR    2025250     91400   17.8300 -112.2200      12.7        45       120        60
OIR    2025250     91400   17.8300 -112.2300      11.6        43       119        60
OIR    2025250     91400   17.8300 -112.2400      10.9        41       117        60
OIR    2025250     91400   17.8300 -112.2500      10.7        40       116        60
OIR    2025250     91400   17.8300 -112.2600      10.6        40       113        60
OIR    2025250     91400   17.8300 -112.2700      10.6        40       113        60
OIR    2025250     91400   17.8300 -112.2800      10.5        39       113        60
OIR    2025250     91400   17.8300 -112.2900      10.5        39       113        60
OIR    2025250     91400   17.8300 -112.3000      10.5        39       111        60
OIR    2025250     91400   17.8300 -112.3100      10.5        38       109        60
OIR    2025250     91400   17.8300 -112.3200      10.7        38       109        60
OIR    2025250     91400   17.8300 -112.3300      10.9        37       108        60
OIR    2025250     91400   17.8300 -112.3400      11.1        35       107        60
OIR    2025250     91400   17.8300 -112.3500      11.2        35       107        60
OIR    2025250     91400   17.8300 -112.3600      11.2        34       107        60
OIR    2025250     91400   17.8300 -112.3700      11.2        33       107        60
OIR    2025250     91400   17.8300 -112.3800      11.2        33       107        60
OIR    2025250     91400   17.8300 -112.3900      11.1        30       107        60
OIR    2025250     91400   17.8300 -112.4000      10.9        19       107        60
OIR    2025250     91400   17.8300 -112.4100      22.1       349       105        60
OIR    2025250     91400   17.8300 -112.4200      57.0       309       104        60
OIR    2025250     91400   17.8300 -112.4300      46.5       276       104        60
OIR    2025250     91400   17.8300 -112.4400      11.1       261       104        60
OIR    2025250     91400   17.8300 -112.4500      43.0       339       103        60
OIR    2025250     91400   17.8300 -112.4600      55.5       286       103        60
OIR    2025250     91400   17.8300 -112.4700      40.2       261       103        60
OIR    2025250     91400   17.8300 -112.4800      12.1       171       104        60
OIR    2025250     91400   17.8300 -112.4900      10.4       129       104        60
OIR    2025250     91400   17.8300 -112.5000       8.7       109       104        60
OIR    2025250     91400   17.8300 -112.5100       6.0        87       104        60
OIR    2025250     91400   17.8300 -112.5200       5.2        73       104        60
OIR    2025250     91400   17.8300 -112.5300       5.2        69       104        60
OIR    2025250     91400   17.8300 -112.5400       5.2        66       104        60
OIR    2025250     91400   17.8300 -112.5500       5.1        59       104        60
OIR    2025250     91400   17.8300 -112.5600       4.8        50       104        60
OIR    2025250     91400   17.8300 -112.5700       4.5        37       104        60
OIR    2025250     91400   17.8300 -112.5800       4.3        31       104        60
OIR    2025250     91400   17.8300 -112.5900       4.2        30       105        60
OIR    2025250     91400   17.8300 -112.6000       4.0        30       107        60
OIR    2025250     91400   17.8300 -112.6200       4.0        28       112        60
OIR    2025250     91400   17.8300 -112.6300       4.2        25       116        60
OIR    2025250     91400   17.8300 -112.6400       4.7        22       116        60
OIR    2025250     91400   17.8300 -112.6500       5.2        22       117        60
OIR    2025250     91400   17.8300 -112.6600       5.7        23       116        60
OIR    2025250     91400   17.8300 -112.6700       6.1        24       116        60
OIR    2025250     91400   17.8300 -112.6800       6.2        25       115        60
OIR    2025250     91400   17.8300 -112.6900       6.1        26       115        60
OIR    2025250     91400   17.8300 -112.7000       6.1        27       115        60
OIR    2025250     91400   17.8300 -112.7100       6.1        27       114        60
OIR    2025250     91400   17.8300 -112.7200       5.9        28       113        60
OIR    2025250     91400   17.8300 -112.7300       5.7        28       113        60
OIR    2025250     91400   17.8300 -112.7400       5.4        28       113        60
OIR    2025250     91400   17.8300 -112.7500       5.2        29       113        60
OIR    2025250     91400   17.8300 -112.7600       5.1        29       115        60
OIR    2025250     91400   17.8300 -112.7700       5.1        29       117        60
OIR    2025250     91400   17.8300 -112.7800       4.9        29       117        60
OIR    2025250     91400   17.8300 -112.7900       4.9        29       116        60
OIR    2025250     91400   17.8300 -112.8000       4.8        30       117        60
OIR    2025250     91400   17.8300 -112.8100       4.7        30       119        60
OIR    2025250     91400   17.8300 -112.8200       4.7        30       121        60
OIR    2025250     91400   17.8300 -112.8300       4.6        30       120        60
OIR    2025250     91400   17.8300 -112.8400       4.6        31       119        60
OIR    2025250     91400   17.8300 -112.8500       4.5        31       120        60
OIR    2025250     91400   17.8300 -112.8600       4.5        31       121        60
OIR    2025250     91400   17.8300 -112.8700       4.4        31       122        60
OIR    2025250     91400   17.8300 -112.8800       4.3        31       125        60
OIR    2025250     91400   17.8300 -112.8900       4.2        32       126        60
OIR    2025250     91400   17.8300 -112.9000       4.1        33       126        60
OIR    2025250     91400   17.8300 -112.9100       4.1        36       127        60
OIR    2025250     91400   17.8300 -112.9200       4.1        41       125        60
OIR    2025250     91400   17.8300 -112.9300       4.1        45       124        60
OIR    2025250     91400   17.8300 -113.2900       4.0        98       123        60
OIR    2025250     91400   17.8300 -113.3800       4.8        12       137        60
OIR    2025250     91400   17.8300 -113.3900       6.3         4       143        60
OIR    2025250     91400   17.8300 -113.4400       8.1       358       143        60
OIR    2025250     91400   17.8300 -113.4500       8.1       358       139        60
OIR    2025250     91400   17.8300 -113.4600       8.2       357       136        60
OIR    2025250     91400   17.8300 -113.4700       8.2       357       136        60
OIR    2025250     91400   17.8300 -113.4800       8.2       357       135        60
OIR    2025250     91400   17.8300 -113.4900       8.2       357       135        60
OIR    2025250     91400   17.8300 -113.5000       8.2       357       135        60
OIR    2025250     91400   17.8300 -113.5100       8.2       357       135        60
OIR    2025250     91400   17.8300 -113.5200       8.2       357       136        60
OIR    2025250     91400   17.8300 -113.5300       8.2       357       136        60
OIR    2025250     91400   17.8300 -113.5400       8.2       357       135        60
OIR    2025250     91400   17.8300 -113.5500       8.1       357       134        60
OIR    2025250     91400   17.8300 -113.5600       8.1       356       136        60
OIR    2025250     91400   17.8300 -113.5700       8.1       356       139        60
OIR    2025250     91400   17.8300 -113.5800       8.1       356       142        60
OIR    2025250     91400   17.8300 -113.6200       7.9       353       143        60
OIR    2025250     91400   17.8300 -113.6300       7.7       353       139        60
OIR    2025250     91400   17.8300 -113.6400       7.6       352       135        60
OIR    2025250     91400   17.8300 -113.6500       7.6       352       135        60
OIR    2025250     91400   17.8300 -113.6600       7.6       352       137        60
OIR    2025250     91400   17.8300 -113.6700       7.5       352       137        60
OIR    2025250     91400   17.8300 -113.6800       7.5       352       136        60
OIR    2025250     91400   17.8300 -113.6900       7.4       352       136        60
OIR    2025250     91400   17.8300 -113.7000       7.4       352       138        60
OIR    2025250     91400   17.8300 -113.7100       7.4       352       138        60
OIR    2025250     91400   17.8300 -113.7200       7.4       352       135        60
OIR    2025250     91400   17.8300 -113.7300       7.4       352       132        60
OIR    2025250     91400   17.8300 -113.7400       7.3       352       131        60
OIR    2025250     91400   17.8300 -113.7500       7.2       353       132        60
OIR    2025250     91400   17.8300 -113.7600       6.9       357       135        60
OIR    2025250     91400   17.8300 -113.7700       6.6         2       140        60
OIR    2025250     91400   17.8300 -113.7900       6.6         2       142        60
OIR    2025250     91400   17.8300 -113.8000       6.6         3       138        60
OIR    2025250     91400   17.8300 -113.8100       6.6         3       137        60
OIR    2025250     91400   17.8300 -113.8200       6.6         3       137        60
OIR    2025250     91400   17.8300 -113.8300       6.6         4       137        60
OIR    2025250     91400   17.8300 -113.8400       6.5         5       136        60
OIR    2025250     91400   17.8300 -113.8500       6.3         7       137        60
OIR    2025250     91400   17.8300 -113.8600       6.2         8       138        60
OIR    2025250     91400   17.8300 -113.8700       6.2         9       140        60
OIR    2025250     91400   17.8300 -113.8800       6.1        10       142        60
OIR    2025250     91400   17.8300 -113.9100       5.0        13       142        60
OIR    2025250     91400   17.8300 -113.9200       5.0        13       141        60
OIR    2025250     91400   17.8300 -113.9300       5.0        13       143        60
OIR    2025250     91400   17.8300 -113.9500       5.0        13       143        60
OIR    2025250     91400   17.8300 -113.9600       5.0        13       143        60
OIR    2025250     91400   17.8300 -113.9700       5.0        13       141        60
OIR    2025250     91400   17.8300 -113.9800       5.1        13       140        60
OIR    2025250     91400   17.8300 -113.9900       5.1        14       139        60
OIR    2025250     91400   17.8300 -114.0000       5.1        14       139        60
OIR    2025250     91400   17.8300 -114.0100       5.2        13       141        60
OIR    2025250     91400   17.8300 -114.1100       5.1       346       139        60
OIR    2025250     91400   17.8300 -114.1200       4.9       348       136        60
OIR    2025250     91400   17.8300 -114.1300       4.9       346       141        60
OIR    2025250     91400   17.8200 -110.5800      16.3        54       143        60
OIR    2025250     91400   17.8200 -110.5900      16.3        54       140        60
OIR    2025250     91400   17.8200 -110.6000      16.3        54       138        60
OIR    2025250     91400   17.8200 -110.6100      16.3        54       136        60
OIR    2025250     91400   17.8200 -110.6200      16.2        54       134        60
OIR    2025250     91400   17.8200 -110.6300      16.2        54       134        60
OIR    2025250     91400   17.8200 -110.6400      16.1        54       135        60
OIR    2025250     91400   17.8200 -110.6500      15.9        54       136        60
OIR    2025250     91400   17.8200 -110.6600      15.8        54       137        60
OIR    2025250     91400   17.8200 -110.6700      15.7        55       138        60
OIR    2025250     91400   17.8200 -110.6800      15.6        55       143        60
OIR    2025250     91400   17.8200 -110.8400      15.5        59       143        60
OIR    2025250     91400   17.8200 -110.8500      15.5        59       142        60
OIR    2025250     91400   17.8200 -110.8600      15.5        59       140        60
OIR    2025250     91400   17.8200 -110.8700      15.5        58       141        60
OIR    2025250     91400   17.8200 -110.8800      15.5        58       141        60
OIR    2025250     91400   17.8200 -110.8900      15.5        58       142        60
OIR    2025250     91400   17.8200 -110.9000      14.7        58       142        60
OIR    2025250     91400   17.8200 -111.5400      13.5        65       142        60
OIR    2025250     91400   17.8200 -111.5500      13.5        65       141        60
OIR    2025250     91400   17.8200 -111.5600      13.4        65       141        60
OIR    2025250     91400   17.8200 -111.5700      13.4        65       141        60
OIR    2025250     91400   17.8200 -111.5800      13.4        64       141        60
OIR    2025250     91400   17.8200 -111.5900      13.4        64       140        60
OIR    2025250     91400   17.8200 -111.6000      13.3        63       137        60
OIR    2025250     91400   17.8200 -111.6100      13.3        62       134        60
OIR    2025250     91400   17.8200 -111.6200      13.2        62       133        60
OIR    2025250     91400   17.8200 -111.6300      13.2        62       131        60
OIR    2025250     91400   17.8200 -111.6400      13.2        62       130        60
OIR    2025250     91400   17.8200 -111.6500      13.2        62       130        60
OIR    2025250     91400   17.8200 -111.6600      13.2        61       130        60
OIR    2025250     91400   17.8200 -111.6700      13.2        61       132        60
OIR    2025250     91400   17.8200 -111.6800      13.3        60       136        60
OIR    2025250     91400   17.8200 -111.6900      13.4        60       139        60
OIR    2025250     91400   17.8200 -111.7000      13.5        59       141        60
OIR    2025250     91400   17.8200 -111.7100      13.5        59       142        60
OIR    2025250     91400   17.8200 -111.7200      13.5        59       142        60
OIR    2025250     91400   17.8200 -111.7300      13.5        59       142        60
OIR    2025250     91400   17.8200 -111.7400      13.5        59       142        60
OIR    2025250     91400   17.8200 -111.7500      13.5        59       141        60
OIR    2025250     91400   17.8200 -111.7600      13.5        59       140        60
OIR    2025250     91400   17.8200 -111.7700      13.5        59       138        60
OIR    2025250     91400   17.8200 -111.7800      13.5        58       137        60
OIR    2025250     91400   17.8200 -111.7900      13.5        58       137        60
OIR    2025250     91400   17.8200 -111.8000      13.5        58       136        60
OIR    2025250     91400   17.8200 -111.8100      13.5        58       137        60
OIR    2025250     91400   17.8200 -111.8200      13.5        58       137        60
OIR    2025250     91400   17.8200 -111.8300      13.5        59       137        60
OIR    2025250     91400   17.8200 -111.8400      13.5        58       136        60
OIR    2025250     91400   17.8200 -111.8500      13.5        58       134        60
OIR    2025250     91400   17.8200 -111.8600      13.4        58       134        60
OIR    2025250     91400   17.8200 -111.8700      13.4        58       133        60
OIR    2025250     91400   17.8200 -111.8800      13.4        58       132        60
OIR    2025250     91400   17.8200 -111.8900      13.4        58       131        60
OIR    2025250     91400   17.8200 -111.9000      13.4        58       131        60
OIR    2025250     91400   17.8200 -111.9100      13.4        58       131        60
OIR    2025250     91400   17.8200 -111.9200      13.5        57       131        60
OIR    2025250     91400   17.8200 -111.9300      13.6        56       130        60
OIR    2025250     91400   17.8200 -111.9400      13.7        55       128        60
OIR    2025250     91400   17.8200 -111.9500      13.8        54       129        60
OIR    2025250     91400   17.8200 -111.9600      13.9        53       131        60
OIR    2025250     91400   17.8200 -111.9700      14.1        52       131        60
OIR    2025250     91400   17.8200 -111.9800      14.2        51       131        60
OIR    2025250     91400   17.8200 -111.9900      14.3        50       131        60
OIR    2025250     91400   17.8200 -112.0000      14.4        49       131        60
OIR    2025250     91400   17.8200 -112.0100      14.5        49       130        60
OIR    2025250     91400   17.8200 -112.0200      14.5        49       130        60
OIR    2025250     91400   17.8200 -112.0300      14.5        49       130        60
OIR    2025250     91400   17.8200 -112.0400      14.5        49       130        60
OIR    2025250     91400   17.8200 -112.0500      14.5        49       131        60
OIR    2025250     91400   17.8200 -112.0600      14.5        49       131        60
OIR    2025250     91400   17.8200 -112.0700      14.5        49       130        60
OIR    2025250     91400   17.8200 -112.0800      14.4        49       129        60
OIR    2025250     91400   17.8200 -112.0900      14.4        49       128        60
OIR    2025250     91400   17.8200 -112.1000      14.3        49       128        60
OIR    2025250     91400   17.8200 -112.1100      14.2        48       126        60
OIR    2025250     91400   17.8200 -112.1200      14.2        48       125        60
OIR    2025250     91400   17.8200 -112.1300      14.1        48       124        60
OIR    2025250     91400   17.8200 -112.1400      14.1        48       124        60
OIR    2025250     91400   17.8200 -112.1500      14.0        48       123        60
OIR    2025250     91400   17.8200 -112.1600      14.0        47       123        60
OIR    2025250     91400   17.8200 -112.1700      13.9        47       123        60
OIR    2025250     91400   17.8200 -112.1800      13.9        47       123        60
OIR    2025250     91400   17.8200 -112.1900      13.8        47       123        60
OIR    2025250     91400   17.8200 -112.2000      13.6        47       123        60
OIR    2025250     91400   17.8200 -112.2100      13.3        46       122        60
OIR    2025250     91400   17.8200 -112.2200      12.8        46       121        60
OIR    2025250     91400   17.8200 -112.2300      11.9        44       120        60
OIR    2025250     91400   17.8200 -112.2400      11.2        42       117        60
OIR    2025250     91400   17.8200 -112.2500      10.9        41       116        60
OIR    2025250     91400   17.8200 -112.2600      10.7        40       115        60
OIR    2025250     91400   17.8200 -112.2700      10.7        40       114        60
OIR    2025250     91400   17.8200 -112.2800      10.6        40       115        60
OIR    2025250     91400   17.8200 -112.2900      10.6        39       115        60
OIR    2025250     91400   17.8200 -112.3000      10.6        39       113        60
OIR    2025250     91400   17.8200 -112.3100      10.7        38       110        60
OIR    2025250     91400   17.8200 -112.3200      10.9        37       110        60
OIR    2025250     91400   17.8200 -112.3300      11.1        36       109        60
OIR    2025250     91400   17.8200 -112.3400      11.3        35       109        60
OIR    2025250     91400   17.8200 -112.3500      11.3        34       109        60
OIR    2025250     91400   17.8200 -112.3600      11.3        34       109        60
OIR    2025250     91400   17.8200 -112.3700      11.3        33       108        60
OIR    2025250     91400   17.8200 -112.3800      11.2        33       108        60
OIR    2025250     91400   17.8200 -112.3900      10.3        27       108        60
OIR    2025250     91400   17.8200 -112.4000       8.0         6       109        60
OIR    2025250     91400   17.8200 -112.4100      13.9       299       108        60
OIR    2025250     91400   17.8200 -112.4200      27.3       279       105        60
OIR    2025250     91400   17.8200 -112.4300      30.8       259       104        60
OIR    2025250     91400   17.8200 -112.4400      24.9       257       104        60
OIR    2025250     91400   17.8200 -112.4500      28.5       277       103        60
OIR    2025250     91400   17.8200 -112.4600      40.0       237       103        60
OIR    2025250     91400   17.8200 -112.4700      42.3       223       104        60
OIR    2025250     91400   17.8200 -112.4800      28.1       188       104        60
OIR    2025250     91400   17.8200 -112.4900      18.2       153       107        60
OIR    2025250     91400   17.8200 -112.5000      13.4       129       108        60
OIR    2025250     91400   17.8200 -112.5100       7.6       104       107        60
OIR    2025250     91400   17.8200 -112.5200       5.4        70       107        60
OIR    2025250     91400   17.8200 -112.5300       5.4        64       105        60
OIR    2025250     91400   17.8200 -112.5400       5.3        59       104        60
OIR    2025250     91400   17.8200 -112.5500       5.3        53       104        60
OIR    2025250     91400   17.8200 -112.5600       5.1        46       104        60
OIR    2025250     91400   17.8200 -112.5700       4.8        37       104        60
OIR    2025250     91400   17.8200 -112.5800       4.7        32       105        60
OIR    2025250     91400   17.8200 -112.5900       4.7        30       107        60
OIR    2025250     91400   17.8200 -112.6000       4.7        29       109        60
OIR    2025250     91400   17.8200 -112.6100       4.7        28       111        60
OIR    2025250     91400   17.8200 -112.6200       4.8        26       114        60
OIR    2025250     91400   17.8200 -112.6300       5.2        24       116        60
OIR    2025250     91400   17.8200 -112.6400       5.6        22       119        60
OIR    2025250     91400   17.8200 -112.6500       5.9        23       119        60
OIR    2025250     91400   17.8200 -112.6600       6.1        24       117        60
OIR    2025250     91400   17.8200 -112.6700       6.3        25       117        60
OIR    2025250     91400   17.8200 -112.6800       6.2        26       116        60
OIR    2025250     91400   17.8200 -112.6900       6.2        26       116        60
OIR    2025250     91400   17.8200 -112.7000       6.2        27       116        60
OIR    2025250     91400   17.8200 -112.7100       6.1        27       115        60
OIR    2025250     91400   17.8200 -112.7200       6.1        27       114        60
OIR    2025250     91400   17.8200 -112.7300       6.0        27       113        60
OIR    2025250     91400   17.8200 -112.7400       5.9        28       113        60
OIR    2025250     91400   17.8200 -112.7500       5.6        29       114        60
OIR    2025250     91400   17.8200 -112.7600       5.4        29       115        60
OIR    2025250     91400   17.8200 -112.7700       5.3        29       116        60
OIR    2025250     91400   17.8200 -112.7800       5.2        29       116        60
OIR    2025250     91400   17.8200 -112.7900       5.1        30       115        60
OIR    2025250     91400   17.8200 -112.8000       5.0        31       116        60
OIR    2025250     91400   17.8200 -112.8100       4.9        31       119        60
OIR    2025250     91400   17.8200 -112.8200       4.9        31       122        60
OIR    2025250     91400   17.8200 -112.8300       4.8        31       123        60
OIR    2025250     91400   17.8200 -112.8400       4.7        31       123        60
OIR    2025250     91400   17.8200 -112.8500       4.6        31       123        60
OIR    2025250     91400   17.8200 -112.8600       4.5        31       123        60
OIR    2025250     91400   17.8200 -112.8700       4.5        31       124        60
OIR    2025250     91400   17.8200 -112.8800       4.4        32       126        60
OIR    2025250     91400   17.8200 -112.8900       4.3        32       127        60
OIR    2025250     91400   17.8200 -112.9000       4.3        33       128        60
OIR    2025250     91400   17.8200 -112.9100       4.3        35       129        60
OIR    2025250     91400   17.8200 -112.9200       4.4        40       127        60
OIR    2025250     91400   17.8200 -112.9300       4.5        44       125        60
OIR    2025250     91400   17.8200 -112.9400       4.4        45       122        60
OIR    2025250     91400   17.8200 -113.3700       4.6        15       131        60
OIR    2025250     91400   17.8200 -113.3800       6.3        12       135        60
OIR    2025250     91400   17.8200 -113.3900       7.0        10       140        60
OIR    2025250     91400   17.8200 -113.4000       7.6         4       141        60
OIR    2025250     91400   17.8200 -113.4100       7.8         2       141        60
OIR    2025250     91400   17.8200 -113.4200       7.9         1       142        60
OIR    2025250     91400   17.8200 -113.4300       8.0       360       141        60
OIR    2025250     91400   17.8200 -113.4400       8.0       359       140        60
OIR    2025250     91400   17.8200 -113.4500       8.1       358       136        60
OIR    2025250     91400   17.8200 -113.4600       8.1       358       132        60
OIR    2025250     91400   17.8200 -113.4700       8.2       357       134        60
OIR    2025250     91400   17.8200 -113.4800       8.2       357       136        60
OIR    2025250     91400   17.8200 -113.4900       8.2       357       137        60
OIR    2025250     91400   17.8200 -113.5000       8.2       357       137        60
OIR    2025250     91400   17.8200 -113.5100       8.2       357       137        60
OIR    2025250     91400   17.8200 -113.5200       8.2       357       136        60
OIR    2025250     91400   17.8200 -113.5300       8.2       357       135        60
OIR    2025250     91400   17.8200 -113.5400       8.2       357       133        60
OIR    2025250     91400   17.8200 -113.5500       8.2       357       130        60
OIR    2025250     91400   17.8200 -113.5600       8.2       356       133        60
OIR    2025250     91400   17.8200 -113.5700       8.1       356       138        60
OIR    2025250     91400   17.8200 -113.5800       8.1       356       143        60
OIR    2025250     91400   17.8200 -113.6300       7.9       353       140        60
OIR    2025250     91400   17.8200 -113.6400       7.7       353       137        60
OIR    2025250     91400   17.8200 -113.6500       7.7       352       134        60
OIR    2025250     91400   17.8200 -113.6600       7.6       352       132        60
OIR    2025250     91400   17.8200 -113.6700       7.6       352       132        60
OIR    2025250     91400   17.8200 -113.6800       7.5       352       134        60
OIR    2025250     91400   17.8200 -113.6900       7.5       352       136        60
OIR    2025250     91400   17.8200 -113.7000       7.5       352       138        60
OIR    2025250     91400   17.8200 -113.7100       7.4       352       140        60
OIR    2025250     91400   17.8200 -113.7200       7.4       352       137        60
OIR    2025250     91400   17.8200 -113.7300       7.4       352       134        60
OIR    2025250     91400   17.8200 -113.7400       7.4       353       134        60
OIR    2025250     91400   17.8200 -113.7500       7.3       354       135        60
OIR    2025250     91400   17.8200 -113.7600       7.0       357       137        60
OIR    2025250     91400   17.8200 -113.7700       6.7         1       140        60
OIR    2025250     91400   17.8200 -113.7800       6.6         2       142        60
OIR    2025250     91400   17.8200 -113.7900       6.6         2       142        60
OIR    2025250     91400   17.8200 -113.8000       6.7         2       140        60
OIR    2025250     91400   17.8200 -113.8100       6.7         3       138        60
OIR    2025250     91400   17.8200 -113.8200       6.7         3       136        60
OIR    2025250     91400   17.8200 -113.8300       6.7         4       136        60
OIR    2025250     91400   17.8200 -113.8400       6.7         5       136        60
OIR    2025250     91400   17.8200 -113.8500       6.6         6       137        60
OIR    2025250     91400   17.8200 -113.8600       6.5         8       138        60
OIR    2025250     91400   17.8200 -113.8700       6.4         9       139        60
OIR    2025250     91400   17.8200 -113.8800       6.4        10       141        60
OIR    2025250     91400   17.8200 -113.9600       5.1        11       142        60
OIR    2025250     91400   17.8200 -113.9700       5.1        11       141        60
OIR    2025250     91400   17.8200 -113.9800       5.2        11       140        60
OIR    2025250     91400   17.8200 -113.9900       5.4        10       139        60
OIR    2025250     91400   17.8200 -114.0000       5.8         7       140        60
OIR    2025250     91400   17.8200 -114.0100       6.4         5       141        60
OIR    2025250     91400   17.8200 -114.0200       6.9         3       143        60
OIR    2025250     91400   17.8200 -114.1100       6.3       351       142        60
OIR    2025250     91400   17.8200 -114.1200       5.9       351       135        60
OIR    2025250     91400   17.8200 -114.1300       5.7       349       141        60
OIR    2025250     91400   17.8100 -110.5900      16.3        54       141        60
OIR    2025250     91400   17.8100 -110.6000      16.3        54       137        60
OIR    2025250     91400   17.8100 -110.6100      16.3        54       134        60
OIR    2025250     91400   17.8100 -110.6200      16.2        54       131        60
OIR    2025250     91400   17.8100 -110.6300      16.2        54       132        60
OIR    2025250     91400   17.8100 -110.6400      16.1        54       133        60
OIR    2025250     91400   17.8100 -110.6500      15.8        54       135        60
OIR    2025250     91400   17.8100 -110.6600      15.6        55       138        60
OIR    2025250     91400   17.8100 -110.6700      15.4        55       140        60
OIR    2025250     91400   17.8100 -110.8200      15.5        59       143        60
OIR    2025250     91400   17.8100 -110.8300      15.5        59       142        60
OIR    2025250     91400   17.8100 -110.8400      15.5        59       141        60
OIR    2025250     91400   17.8100 -110.8500      15.5        59       142        60
OIR    2025250     91400   17.8100 -110.8600      15.5        59       142        60
OIR    2025250     91400   17.8100 -110.8700      15.5        59       142        60
OIR    2025250     91400   17.8100 -110.8800      15.4        59       143        60
OIR    2025250     91400   17.8100 -110.8900      15.3        59       143        60
OIR    2025250     91400   17.8100 -110.9000      15.1        59       144        60
OIR    2025250     91400   17.8100 -111.5800      13.3        64       144        60
OIR    2025250     91400   17.8100 -111.5900      13.3        63       142        60
OIR    2025250     91400   17.8100 -111.6000      13.3        63       140        60
OIR    2025250     91400   17.8100 -111.6100      13.3        62       137        60
OIR    2025250     91400   17.8100 -111.6200      13.2        62       134        60
OIR    2025250     91400   17.8100 -111.6300      13.2        62       131        60
OIR    2025250     91400   17.8100 -111.6400      13.2        62       130        60
OIR    2025250     91400   17.8100 -111.6500      13.1        62       130        60
OIR    2025250     91400   17.8100 -111.6600      13.2        61       130        60
OIR    2025250     91400   17.8100 -111.6700      13.3        61       132        60
OIR    2025250     91400   17.8100 -111.6800      13.4        60       136        60
OIR    2025250     91400   17.8100 -111.6900      13.5        59       139        60
OIR    2025250     91400   17.8100 -111.7000      13.5        59       141        60
OIR    2025250     91400   17.8100 -111.7100      13.5        59       144        60
OIR    2025250     91400   17.8100 -111.7200      13.5        59       144        60
OIR    2025250     91400   17.8100 -111.7400      13.5        59       144        60
OIR    2025250     91400   17.8100 -111.7500      13.5        59       143        60
OIR    2025250     91400   17.8100 -111.7600      13.5        59       142        60
OIR    2025250     91400   17.8100 -111.7700      13.5        58       139        60
OIR    2025250     91400   17.8100 -111.7800      13.5        58       136        60
OIR    2025250     91400   17.8100 -111.7900      13.5        58       138        60
OIR    2025250     91400   17.8100 -111.8000      13.5        58       140        60
OIR    2025250     91400   17.8100 -111.8100      13.5        58       140        60
OIR    2025250     91400   17.8100 -111.8200      13.5        58       139        60
OIR    2025250     91400   17.8100 -111.8300      13.6        58       139        60
OIR    2025250     91400   17.8100 -111.8400      13.6        58       139        60
OIR    2025250     91400   17.8100 -111.8500      13.6        58       140        60
OIR    2025250     91400   17.8100 -111.8600      13.6        58       138        60
OIR    2025250     91400   17.8100 -111.8700      13.6        58       136        60
OIR    2025250     91400   17.8100 -111.8800      13.5        58       134        60
OIR    2025250     91400   17.8100 -111.8900      13.5        58       131        60
OIR    2025250     91400   17.8100 -111.9000      13.6        57       130        60
OIR    2025250     91400   17.8100 -111.9100      13.6        57       130        60
OIR    2025250     91400   17.8100 -111.9200      13.7        56       130        60
OIR    2025250     91400   17.8100 -111.9300      13.9        55       129        60
OIR    2025250     91400   17.8100 -111.9400      14.1        53       128        60
OIR    2025250     91400   17.8100 -111.9500      14.2        52       130        60
OIR    2025250     91400   17.8100 -111.9600      14.3        51       132        60
OIR    2025250     91400   17.8100 -111.9700      14.4        50       133        60
OIR    2025250     91400   17.8100 -111.9800      14.5        49       132        60
OIR    2025250     91400   17.8100 -111.9900      14.5        49       132        60
OIR    2025250     91400   17.8100 -112.0000      14.5        49       133        60
OIR    2025250     91400   17.8100 -112.0100      14.5        49       133        60
OIR    2025250     91400   17.8100 -112.0200      14.6        49       132        60
OIR    2025250     91400   17.8100 -112.0300      14.6        49       132        60
OIR    2025250     91400   17.8100 -112.0400      14.6        49       132        60
OIR    2025250     91400   17.8100 -112.0500      14.6        49       131        60
OIR    2025250     91400   17.8100 -112.0600      14.6        49       131        60
OIR    2025250     91400   17.8100 -112.0700      14.5        48       131        60
OIR    2025250     91400   17.8100 -112.0800      14.5        48       130        60
OIR    2025250     91400   17.8100 -112.0900      14.5        48       130        60
OIR    2025250     91400   17.8100 -112.1000      14.4        48       129        60
OIR    2025250     91400   17.8100 -112.1100      14.4        48       128        60
OIR    2025250     91400   17.8100 -112.1200      14.3        48       127        60
OIR    2025250     91400   17.8100 -112.1300      14.2        48       126        60
OIR    2025250     91400   17.8100 -112.1400      14.1        48       125        60
OIR    2025250     91400   17.8100 -112.1500      14.1        48       124        60
OIR    2025250     91400   17.8100 -112.1600      14.0        47       124        60
OIR    2025250     91400   17.8100 -112.1700      14.0        47       124        60
OIR    2025250     91400   17.8100 -112.1800      13.9        47       124        60
OIR    2025250     91400   17.8100 -112.1900      13.8        47       124        60
OIR    2025250     91400   17.8100 -112.2000      13.6        47       124        60
OIR    2025250     91400   17.8100 -112.2100      13.3        46       122        60
OIR    2025250     91400   17.8100 -112.2200      12.9        46       121        60
OIR    2025250     91400   17.8100 -112.2300      12.1        44       120        60
OIR    2025250     91400   17.8100 -112.2400      11.5        43       119        60
OIR    2025250     91400   17.8100 -112.2500      11.1        42       117        60
OIR    2025250     91400   17.8100 -112.2600      10.9        41       116        60
OIR    2025250     91400   17.8100 -112.2700      10.8        40       116        60
OIR    2025250     91400   17.8100 -112.2800      10.8        40       116        60
OIR    2025250     91400   17.8100 -112.2900      10.8        39       116        60
OIR    2025250     91400   17.8100 -112.3000      10.8        38       115        60
OIR    2025250     91400   17.8100 -112.3100      10.9        38       112        60
OIR    2025250     91400   17.8100 -112.3200      11.1        36       112        60
OIR    2025250     91400   17.8100 -112.3300      11.3        35       112        60
OIR    2025250     91400   17.8100 -112.3400      11.4        35       111        60
OIR    2025250     91400   17.8100 -112.3500      11.4        34       111        60
OIR    2025250     91400   17.8100 -112.3600      11.4        34       110        60
OIR    2025250     91400   17.8100 -112.3700      11.3        33       110        60
OIR    2025250     91400   17.8100 -112.3800      11.3        33       110        60
OIR    2025250     91400   17.8100 -112.3900       9.5        26       110        60
OIR    2025250     91400   17.8100 -112.4000       4.7       356       110        60
OIR    2025250     91400   17.8100 -112.4100      13.8       247       110        60
OIR    2025250     91400   17.8100 -112.4200      25.8       238       108        60
OIR    2025250     91400   17.8100 -112.4300      31.7       236       105        60
OIR    2025250     91400   17.8100 -112.4400      32.3       228       104        60
OIR    2025250     91400   17.8100 -112.4500      36.8       219       104        60
OIR    2025250     91400   17.8100 -112.4600      40.2       217       104        60
OIR    2025250     91400   17.8100 -112.4700      41.5       214       104        60
OIR    2025250     91400   17.8100 -112.4800      35.5       199       105        60
OIR    2025250     91400   17.8100 -112.4900      23.0       162       109        60
OIR    2025250     91400   17.8100 -112.5000      16.9       138       111        60
OIR    2025250     91400   17.8100 -112.5100       9.1       112       110        60
OIR    2025250     91400   17.8100 -112.5200       5.8        67       109        60
OIR    2025250     91400   17.8100 -112.5300       5.7        59       107        60
OIR    2025250     91400   17.8100 -112.5400       5.7        53       104        60
OIR    2025250     91400   17.8100 -112.5500       5.8        48       104        60
OIR    2025250     91400   17.8100 -112.5600       5.7        44       104        60
OIR    2025250     91400   17.8100 -112.5700       5.4        38       104        60
OIR    2025250     91400   17.8100 -112.5800       5.1        33       107        60
OIR    2025250     91400   17.8100 -112.5900       5.0        30       109        60
OIR    2025250     91400   17.8100 -112.6000       5.3        29       111        60
OIR    2025250     91400   17.8100 -112.6100       5.6        27       113        60
OIR    2025250     91400   17.8100 -112.6200       5.9        25       116        60
OIR    2025250     91400   17.8100 -112.6300       6.1        24       117        60
OIR    2025250     91400   17.8100 -112.6400       6.2        23       120        60
OIR    2025250     91400   17.8100 -112.6500       6.3        24       120        60
OIR    2025250     91400   17.8100 -112.6600       6.4        24       119        60
OIR    2025250     91400   17.8100 -112.6700       6.4        25       120        60
OIR    2025250     91400   17.8100 -112.6800       6.3        25       121        60
OIR    2025250     91400   17.8100 -112.6900       6.3        26       121        60
OIR    2025250     91400   17.8100 -112.7000       6.2        27       120        60
OIR    2025250     91400   17.8100 -112.7100       6.1        27       117        60
OIR    2025250     91400   17.8100 -112.7200       6.0        27       115        60
OIR    2025250     91400   17.8100 -112.7300       6.0        27       112        60
OIR    2025250     91400   17.8100 -112.7400       6.0        27       114        60
OIR    2025250     91400   17.8100 -112.7500       5.8        28       116        60
OIR    2025250     91400   17.8100 -112.7600       5.6        28       116        60
OIR    2025250     91400   17.8100 -112.7700       5.5        29       117        60
OIR    2025250     91400   17.8100 -112.7800       5.4        29       117        60
OIR    2025250     91400   17.8100 -112.7900       5.4        30       116        60
OIR    2025250     91400   17.8100 -112.8000       5.3        30       116        60
OIR    2025250     91400   17.8100 -112.8100       5.2        31       119        60
OIR    2025250     91400   17.8100 -112.8200       5.1        31       122        60
OIR    2025250     91400   17.8100 -112.8300       5.1        31       123        60
OIR    2025250     91400   17.8100 -112.8400       5.0        31       124        60
OIR    2025250     91400   17.8100 -112.8500       4.8        31       124        60
OIR    2025250     91400   17.8100 -112.8600       4.6        31       124        60
OIR    2025250     91400   17.8100 -112.8700       4.5        31       124        60
OIR    2025250     91400   17.8100 -112.8800       4.5        32       126        60
OIR    2025250     91400   17.8100 -112.8900       4.4        32       128        60
OIR    2025250     91400   17.8100 -112.9000       4.4        33       129        60
OIR    2025250     91400   17.8100 -112.9100       4.5        34       130        60
OIR    2025250     91400   17.8100 -112.9200       5.0        40       128        60
OIR    2025250     91400   17.8100 -112.9300       5.3        42       126        60
OIR    2025250     91400   17.8100 -112.9400       5.4        44       123        60
OIR    2025250     91400   17.8100 -112.9500       5.4        46       121        60
OIR    2025250     91400   17.8100 -112.9600       4.4        48       119        60
OIR    2025250     91400   17.8100 -113.3400       4.0        49       121        60
OIR    2025250     91400   17.8100 -113.3600       4.0        25       128        60
OIR    2025250     91400   17.8100 -113.3700       5.2        15       133        60
OIR    2025250     91400   17.8100 -113.3800       6.8        11       136        60
OIR    2025250     91400   17.8100 -113.3900       7.1        10       138        60
OIR    2025250     91400   17.8100 -113.4000       7.6         5       138        60
OIR    2025250     91400   17.8100 -113.4100       7.8         2       137        60
OIR    2025250     91400   17.8100 -113.4200       7.9         2       136        60
OIR    2025250     91400   17.8100 -113.4300       8.0         1       136        60
OIR    2025250     91400   17.8100 -113.4400       8.0         0       136        60
OIR    2025250     91400   17.8100 -113.4500       8.1       359       133        60
OIR    2025250     91400   17.8100 -113.4600       8.1       358       131        60
OIR    2025250     91400   17.8100 -113.4700       8.2       358       131        60
OIR    2025250     91400   17.8100 -113.4800       8.2       357       133        60
OIR    2025250     91400   17.8100 -113.4900       8.2       357       135        60
OIR    2025250     91400   17.8100 -113.5000       8.2       357       136        60
OIR    2025250     91400   17.8100 -113.5100       8.2       357       137        60
OIR    2025250     91400   17.8100 -113.5200       8.2       357       136        60
OIR    2025250     91400   17.8100 -113.5300       8.2       357       135        60
OIR    2025250     91400   17.8100 -113.5400       8.2       357       133        60
OIR    2025250     91400   17.8100 -113.5500       8.2       356       132        60
OIR    2025250     91400   17.8100 -113.5600       8.2       356       132        60
OIR    2025250     91400   17.8100 -113.5700       8.2       356       134        60
OIR    2025250     91400   17.8100 -113.5800       8.2       356       137        60
OIR    2025250     91400   17.8100 -113.5900       8.2       356       140        60
OIR    2025250     91400   17.8100 -113.6000       8.2       355       142        60
OIR    2025250     91400   17.8100 -113.6100       8.2       355       142        60
OIR    2025250     91400   17.8100 -113.6200       8.1       355       142        60
OIR    2025250     91400   17.8100 -113.6300       8.0       354       139        60
OIR    2025250     91400   17.8100 -113.6400       7.9       353       136        60
OIR    2025250     91400   17.8100 -113.6500       7.7       353       135        60
OIR    2025250     91400   17.8100 -113.6600       7.7       352       135        60
OIR    2025250     91400   17.8100 -113.6700       7.6       352       134        60
OIR    2025250     91400   17.8100 -113.6800       7.6       352       136        60
OIR    2025250     91400   17.8100 -113.6900       7.5       352       138        60
OIR    2025250     91400   17.8100 -113.7000       7.5       352       139        60
OIR    2025250     91400   17.8100 -113.7100       7.5       352       140        60
OIR    2025250     91400   17.8100 -113.7200       7.4       352       139        60
OIR    2025250     91400   17.8100 -113.7300       7.4       352       137        60
OIR    2025250     91400   17.8100 -113.7400       7.4       353       136        60
OIR    2025250     91400   17.8100 -113.7500       7.3       354       138        60
OIR    2025250     91400   17.8100 -113.7600       7.2       356       139        60
OIR    2025250     91400   17.8100 -113.7700       7.1       357       139        60
OIR    2025250     91400   17.8100 -113.7800       6.8         0       140        60
OIR    2025250     91400   17.8100 -113.7900       6.7         1       139        60
OIR    2025250     91400   17.8100 -113.8000       6.7         2       139        60
OIR    2025250     91400   17.8100 -113.8100       6.8         2       138        60
OIR    2025250     91400   17.8100 -113.8200       6.9         3       135        60
OIR    2025250     91400   17.8100 -113.8300       6.9         3       134        60
OIR    2025250     91400   17.8100 -113.8400       6.9         4       135        60
OIR    2025250     91400   17.8100 -113.8500       6.9         6       136        60
OIR    2025250     91400   17.8100 -113.8600       6.8         7       137        60
OIR    2025250     91400   17.8100 -113.8700       6.7         8       137        60
OIR    2025250     91400   17.8100 -113.8800       6.7         9       140        60
OIR    2025250     91400   17.8100 -113.8900       6.5         8       143        60
OIR    2025250     91400   17.8100 -113.9600       5.2         9       142        60
OIR    2025250     91400   17.8100 -113.9700       5.2        10       140        60
OIR    2025250     91400   17.8100 -113.9800       5.3         9       139        60
OIR    2025250     91400   17.8100 -113.9900       5.7         7       139        60
OIR    2025250     91400   17.8100 -114.0000       6.2         5       140        60
OIR    2025250     91400   17.8100 -114.0100       6.8         3       141        60
OIR    2025250     91400   17.8100 -114.0200       7.1         2       141        60
OIR    2025250     91400   17.8100 -114.0300       7.2         2       142        60
OIR    2025250     91400   17.8100 -114.0400       7.2         2       141        60
OIR    2025250     91400   17.8100 -114.0500       7.2         2       139        60
OIR    2025250     91400   17.8100 -114.0600       7.2         2       143        60
OIR    2025250     91400   17.8100 -114.1200       6.6       351       141        60
OIR    2025250     91400   17.8100 -114.1300       6.4       350       143        60
OIR    2025250     91400   17.8000 -110.5900      16.3        54       142        60
OIR    2025250     91400   17.8000 -110.6000      16.3        54       137        60
OIR    2025250     91400   17.8000 -110.6100      16.3        54       135        60
OIR    2025250     91400   17.8000 -110.6200      16.2        54       134        60
OIR    2025250     91400   17.8000 -110.6300      16.2        54       133        60
OIR    2025250     91400   17.8000 -110.6400      16.0        54       134        60
OIR    2025250     91400   17.8000 -110.6500      15.7        55       136        60
OIR    2025250     91400   17.8000 -110.6600      15.4        55       139        60
OIR    2025250     91400   17.8000 -110.6700      15.2        56       142        60
OIR    2025250     91400   17.8000 -110.8100      15.5        59       143        60
OIR    2025250     91400   17.8000 -110.8200      15.5        59       141        60
OIR    2025250     91400   17.8000 -110.8300      15.5        59       140        60
OIR    2025250     91400   17.8000 -110.8400      15.5        59       139        60
OIR    2025250     91400   17.8000 -110.8500      15.4        59       142        60
OIR    2025250     91400   17.8000 -111.6000      13.2        62       142        60
OIR    2025250     91400   17.8000 -111.6100      13.2        62       139        60
OIR    2025250     91400   17.8000 -111.6200      13.2        62       136        60
OIR    2025250     91400   17.8000 -111.6300      13.2        62       132        60
OIR    2025250     91400   17.8000 -111.6400      13.2        62       128        60
OIR    2025250     91400   17.8000 -111.6500      13.1        61       129        60
OIR    2025250     91400   17.8000 -111.6600      13.1        61       131        60
OIR    2025250     91400   17.8000 -111.6700      13.3        60       133        60
OIR    2025250     91400   17.8000 -111.6800      13.4        60       135        60
OIR    2025250     91400   17.8000 -111.6900      13.5        59       138        60
OIR    2025250     91400   17.8000 -111.7000      13.5        59       140        60
OIR    2025250     91400   17.8000 -111.7100      13.5        59       143        60
OIR    2025250     91400   17.8000 -111.7200      13.5        59       143        60
OIR    2025250     91400   17.8000 -111.7300      13.5        59       144        60
OIR    2025250     91400   17.8000 -111.7400      13.5        59       143        60
OIR    2025250     91400   17.8000 -111.7500      13.5        59       142        60
OIR    2025250     91400   17.8000 -111.7600      13.5        58       140        60
OIR    2025250     91400   17.8000 -111.7700      13.5        58       140        60
OIR    2025250     91400   17.8000 -111.7800      13.5        58       139        60
OIR    2025250     91400   17.8000 -111.7900      13.5        58       137        60
OIR    2025250     91400   17.8000 -111.8000      13.5        58       136        60
OIR    2025250     91400   17.8000 -111.8100      13.6        58       137        60
OIR    2025250     91400   17.8000 -111.8200      13.7        58       138        60
OIR    2025250     91400   17.8000 -111.8300      13.8        58       139        60
OIR    2025250     91400   17.8000 -111.8400      13.9        58       139        60
OIR    2025250     91400   17.8000 -111.8500      13.9        58       138        60
OIR    2025250     91400   17.8000 -111.8600      13.9        58       137        60
OIR    2025250     91400   17.8000 -111.8700      13.9        58       135        60
OIR    2025250     91400   17.8000 -111.8800      13.9        57       134        60
OIR    2025250     91400   17.8000 -111.8900      13.9        56       132        60
OIR    2025250     91400   17.8000 -111.9000      13.9        56       131        60
OIR    2025250     91400   17.8000 -111.9100      13.9        55       130        60
OIR    2025250     91400   17.8000 -111.9200      14.0        54       129        60
OIR    2025250     91400   17.8000 -111.9300      14.2        53       129        60
OIR    2025250     91400   17.8000 -111.9400      14.4        51       130        60
OIR    2025250     91400   17.8000 -111.9500      14.5        50       131        60
OIR    2025250     91400   17.8000 -111.9600      14.6        50       133        60
OIR    2025250     91400   17.8000 -111.9700      14.6        49       134        60
OIR    2025250     91400   17.8000 -111.9800      14.6        49       134        60
OIR    2025250     91400   17.8000 -111.9900      14.6        49       133        60
OIR    2025250     91400   17.8000 -112.0000      14.6        49       134        60
OIR    2025250     91400   17.8000 -112.0100      14.6        49       134        60
OIR    2025250     91400   17.8000 -112.0200      14.6        49       134        60
OIR    2025250     91400   17.8000 -112.0300      14.6        49       134        60
OIR    2025250     91400   17.8000 -112.0400      14.6        49       133        60
OIR    2025250     91400   17.8000 -112.0500      14.6        48       132        60
OIR    2025250     91400   17.8000 -112.0600      14.6        48       131        60
OIR    2025250     91400   17.8000 -112.0700      14.6        48       131        60
OIR    2025250     91400   17.8000 -112.0800      14.5        48       131        60
OIR    2025250     91400   17.8000 -112.0900      14.5        48       131        60
OIR    2025250     91400   17.8000 -112.1000      14.5        48       130        60
OIR    2025250     91400   17.8000 -112.1100      14.5        48       129        60
OIR    2025250     91400   17.8000 -112.1200      14.4        48       128        60
OIR    2025250     91400   17.8000 -112.1300      14.3        47       127        60
OIR    2025250     91400   17.8000 -112.1400      14.3        47       126        60
OIR    2025250     91400   17.8000 -112.1500      14.2        47       125        60
OIR    2025250     91400   17.8000 -112.1600      14.1        47       125        60
OIR    2025250     91400   17.8000 -112.1700      14.1        47       125        60
OIR    2025250     91400   17.8000 -112.1800      14.0        47       124        60
OIR    2025250     91400   17.8000 -112.1900      13.9        47       125        60
OIR    2025250     91400   17.8000 -112.2000      13.7        47       126        60
OIR    2025250     91400   17.8000 -112.2100      13.4        46       123        60
OIR    2025250     91400   17.8000 -112.2200      13.0        46       120        60
OIR    2025250     91400   17.8000 -112.2300      12.5        44       120        60
OIR    2025250     91400   17.8000 -112.2400      11.8        43       121        60
OIR    2025250     91400   17.8000 -112.2500      11.5        42       121        60
OIR    2025250     91400   17.8000 -112.2600      11.3        41       120        60
OIR    2025250     91400   17.8000 -112.2700      11.2        41       117        60
OIR    2025250     91400   17.8000 -112.2800      11.1        40       117        60
OIR    2025250     91400   17.8000 -112.2900      11.1        39       117        60
OIR    2025250     91400   17.8000 -112.3000      11.1        38       116        60
OIR    2025250     91400   17.8000 -112.3100      11.2        37       115        60
OIR    2025250     91400   17.8000 -112.3200      11.3        36       115        60
OIR    2025250     91400   17.8000 -112.3300      11.4        35       114        60
OIR    2025250     91400   17.8000 -112.3400      11.4        35       114        60
OIR    2025250     91400   17.8000 -112.3500      11.4        35       112        60
OIR    2025250     91400   17.8000 -112.3600      11.5        34       111        60
OIR    2025250     91400   17.8000 -112.3700      11.4        34       111        60
OIR    2025250     91400   17.8000 -112.3800      11.4        33       112        60
OIR    2025250     91400   17.8000 -112.3900       9.6        30       113        60
OIR    2025250     91400   17.8000 -112.4100      14.0       225       113        60
OIR    2025250     91400   17.8000 -112.4200      25.8       219       111        60
OIR    2025250     91400   17.8000 -112.4300      34.4       216       109        60
OIR    2025250     91400   17.8000 -112.4400      37.4       215       107        60
OIR    2025250     91400   17.8000 -112.4500      38.1       214       105        60
OIR    2025250     91400   17.8000 -112.4600      38.7       213       105        60
OIR    2025250     91400   17.8000 -112.4700      39.0       211       107        60
OIR    2025250     91400   17.8000 -112.4800      35.7       199       109        60
OIR    2025250     91400   17.8000 -112.4900      25.2       163       110        60
OIR    2025250     91400   17.8000 -112.5000      17.7       141       112        60
OIR    2025250     91400   17.8000 -112.5100       9.1       110       110        60
OIR    2025250     91400   17.8000 -112.5200       6.6        62       108        60
OIR    2025250     91400   17.8000 -112.5300       6.6        53       107        60
OIR    2025250     91400   17.8000 -112.5400       6.4        48       105        60
OIR    2025250     91400   17.8000 -112.5500       6.3        45       104        60
OIR    2025250     91400   17.8000 -112.5600       6.3        43       105        60
OIR    2025250     91400   17.8000 -112.5700       6.2        39       107        60
OIR    2025250     91400   17.8000 -112.5800       6.1        33       108        60
OIR    2025250     91400   17.8000 -112.5900       6.4        28       110        60
OIR    2025250     91400   17.8000 -112.6000       6.7        26       112        60
OIR    2025250     91400   17.8000 -112.6100       6.7        26       114        60
OIR    2025250     91400   17.8000 -112.6200       6.7        25       116        60
OIR    2025250     91400   17.8000 -112.6300       6.7        24       119        60
OIR    2025250     91400   17.8000 -112.6400       6.7        24       121        60
OIR    2025250     91400   17.8000 -112.6500       6.6        24       121        60
OIR    2025250     91400   17.8000 -112.6600       6.6        24       120        60
OIR    2025250     91400   17.8000 -112.6700       6.6        25       121        60
OIR    2025250     91400   17.8000 -112.6800       6.5        25       123        60
OIR    2025250     91400   17.8000 -112.6900       6.4        26       124        60
OIR    2025250     91400   17.8000 -112.7000       6.3        27       123        60
OIR    2025250     91400   17.8000 -112.7100       6.2        27       122        60
OIR    2025250     91400   17.8000 -112.7200       6.1        27       117        60
OIR    2025250     91400   17.8000 -112.7300       6.0        27       114        60
OIR    2025250     91400   17.8000 -112.7400       6.1        27       116        60
OIR    2025250     91400   17.8000 -112.7500       6.1        27       117        60
OIR    2025250     91400   17.8000 -112.7600       5.8        27       119        60
OIR    2025250     91400   17.8000 -112.7700       5.6        28       119        60
OIR    2025250     91400   17.8000 -112.7800       5.6        29       120        60
OIR    2025250     91400   17.8000 -112.7900       5.5        29       119        60
OIR    2025250     91400   17.8000 -112.8000       5.5        30       117        60
OIR    2025250     91400   17.8000 -112.8100       5.4        30       120        60
OIR    2025250     91400   17.8000 -112.8200       5.4        31       122        60
OIR    2025250     91400   17.8000 -112.8300       5.4        31       123        60
OIR    2025250     91400   17.8000 -112.8400       5.4        30       124        60
OIR    2025250     91400   17.8000 -112.8500       5.3        30       125        60
OIR    2025250     91400   17.8000 -112.8600       5.1        30       125        60
OIR    2025250     91400   17.8000 -112.8700       4.8        30       124        60
OIR    2025250     91400   17.8000 -112.8800       4.7        31       126        60
OIR    2025250     91400   17.8000 -112.8900       4.7        32       127        60
OIR    2025250     91400   17.8000 -112.9000       4.6        33       129        60
OIR    2025250     91400   17.8000 -112.9100       4.8        34       131        60
OIR    2025250     91400   17.8000 -112.9200       5.8        39       130        60
OIR    2025250     91400   17.8000 -112.9300       6.3        40       127        60
OIR    2025250     91400   17.8000 -112.9400       6.3        41       125        60
OIR    2025250     91400   17.8000 -112.9500       6.5        42       122        60
OIR    2025250     91400   17.8000 -112.9600       6.3        42       119        60
OIR    2025250     91400   17.8000 -112.9700       5.8        38       117        60
OIR    2025250     91400   17.8000 -113.3200       4.1        35       121        60
OIR    2025250     91400   17.8000 -113.3300       4.7        31       121        60
OIR    2025250     91400   17.8000 -113.3400       5.3        28       123        60
OIR    2025250     91400   17.8000 -113.3500       5.4        29       126        60
OIR    2025250     91400   17.8000 -113.3600       5.3        20       130        60
OIR    2025250     91400   17.8000 -113.3700       6.6        12       134        60
OIR    2025250     91400   17.8000 -113.3800       7.2        10       136        60
OIR    2025250     91400   17.8000 -113.3900       7.3         9       137        60
OIR    2025250     91400   17.8000 -113.4000       7.6         5       136        60
OIR    2025250     91400   17.8000 -113.4100       7.8         3       134        60
OIR    2025250     91400   17.8000 -113.4200       7.8         2       133        60
OIR    2025250     91400   17.8000 -113.4300       7.9         2       132        60
OIR    2025250     91400   17.8000 -113.4400       8.0         1       132        60
OIR    2025250     91400   17.8000 -113.4500       8.1       360       132        60
OIR    2025250     91400   17.8000 -113.4600       8.1       359       130        60
OIR    2025250     91400   17.8000 -113.4700       8.2       358       130        60
OIR    2025250     91400   17.8000 -113.4800       8.2       358       132        60
OIR    2025250     91400   17.8000 -113.4900       8.2       358       133        60
OIR    2025250     91400   17.8000 -113.5000       8.2       357       135        60
OIR    2025250     91400   17.8000 -113.5100       8.2       357       137        60
OIR    2025250     91400   17.8000 -113.5200       8.2       357       136        60
OIR    2025250     91400   17.8000 -113.5300       8.2       357       134        60
OIR    2025250     91400   17.8000 -113.5400       8.2       357       133        60
OIR    2025250     91400   17.8000 -113.5500       8.2       356       133        60
OIR    2025250     91400   17.8000 -113.5600       8.2       356       133        60
OIR    2025250     91400   17.8000 -113.5700       8.2       356       132        60
OIR    2025250     91400   17.8000 -113.5800       8.2       356       132        60
OIR    2025250     91400   17.8000 -113.5900       8.2       356       133        60
OIR    2025250     91400   17.8000 -113.6000       8.2       356       134        60
OIR    2025250     91400   17.8000 -113.6100       8.2       355       136        60
OIR    2025250     91400   17.8000 -113.6200       8.2       355       138        60
OIR    2025250     91400   17.8000 -113.6300       8.1       355       137        60
OIR    2025250     91400   17.8000 -113.6400       8.0       354       135        60
OIR    2025250     91400   17.8000 -113.6500       7.9       353       135        60
OIR    2025250     91400   17.8000 -113.6600       7.7       353       138        60
OIR    2025250     91400   17.8000 -113.6700       7.7       352       140        60
OIR    2025250     91400   17.8000 -113.6800       7.6       352       141        60
OIR    2025250     91400   17.8000 -113.6900       7.6       352       143        60
OIR    2025250     91400   17.8000 -113.7000       7.6       352       143        60
OIR    2025250     91400   17.8000 -113.7100       7.5       352       143        60
OIR    2025250     91400   17.8000 -113.7200       7.5       352       141        60
OIR    2025250     91400   17.8000 -113.7300       7.5       353       139        60
OIR    2025250     91400   17.8000 -113.7400       7.5       353       137        60
OIR    2025250     91400   17.8000 -113.7500       7.5       354       139        60
OIR    2025250     91400   17.8000 -113.7600       7.4       355       141        60
OIR    2025250     91400   17.8000 -113.7700       7.3       356       139        60
OIR    2025250     91400   17.8000 -113.7800       7.0       359       137        60
OIR    2025250     91400   17.8000 -113.7900       6.9         1       135        60
OIR    2025250     91400   17.8000 -113.8000       6.9         1       134        60
OIR    2025250     91400   17.8000 -113.8100       7.0         2       132        60
OIR    2025250     91400   17.8000 -113.8200       7.0         2       130        60
OIR    2025250     91400   17.8000 -113.8300       7.1         3       128        60
OIR    2025250     91400   17.8000 -113.8400       7.1         4       130        60
OIR    2025250     91400   17.8000 -113.8500       7.0         5       132        60
OIR    2025250     91400   17.8000 -113.8600       7.0         6       133        60
OIR    2025250     91400   17.8000 -113.8700       7.0         7       135        60
OIR    2025250     91400   17.8000 -113.8800       7.0         7       137        60
OIR    2025250     91400   17.8000 -113.8900       6.9         7       140        60
OIR    2025250     91400   17.8000 -113.9000       6.5         6       142        60
OIR    2025250     91400   17.8000 -113.9100       6.3         6       143        60
OIR    2025250     91400   17.8000 -113.9600       5.6         6       143        60
OIR    2025250     91400   17.8000 -113.9700       5.7         6       139        60
OIR    2025250     91400   17.8000 -113.9800       6.0         7       138        60
OIR    2025250     91400   17.8000 -113.9900       6.2         6       137        60
OIR    2025250     91400   17.8000 -114.0000       6.7         4       137        60
OIR    2025250     91400   17.8000 -114.0100       7.2         2       138        60
OIR    2025250     91400   17.8000 -114.0200       7.3         2       138        60
OIR    2025250     91400   17.8000 -114.0300       7.3         2       138        60
OIR    2025250     91400   17.8000 -114.0400       7.3         1       138        60
OIR    2025250     91400   17.8000 -114.0500       7.2         1       138        60
OIR    2025250     91400   17.8000 -114.0600       7.2         1       141        60
OIR    2025250     91400   17.8000 -114.1100       6.9       352       144        60
OIR    2025250     91400   17.7900 -110.6000      16.3        54       139        60
OIR    2025250     91400   17.7900 -110.6100      16.3        54       138        60
OIR    2025250     91400   17.7900 -110.6200      16.2        54       138        60
OIR    2025250     91400   17.7900 -110.6300      16.1        54       138        60
OIR    2025250     91400   17.7900 -110.6400      15.9        55       137        60
OIR    2025250     91400   17.7900 -110.6500      15.5        55       136        60
OIR    2025250     91400   17.7900 -110.6600      15.2        56       140        60
OIR    2025250     91400   17.7900 -110.8200      15.4        59       142        60
OIR    2025250     91400   17.7900 -110.8300      15.4        59       141        60
OIR    2025250     91400   17.7900 -110.8400      15.3        59       141        60
OIR    2025250     91400   17.7900 -110.8500      15.3        59       144        60
OIR    2025250     91400   17.7900 -111.6000      13.2        62       144        60
OIR    2025250     91400   17.7900 -111.6100      13.2        62       140        60
OIR    2025250     91400   17.7900 -111.6200      13.2        62       137        60
OIR    2025250     91400   17.7900 -111.6300      13.1        62       133        60
OIR    2025250     91400   17.7900 -111.6400      13.1        61       130        60
OIR    2025250     91400   17.7900 -111.6500      13.0        61       130        60
OIR    2025250     91400   17.7900 -111.6600      13.1        61       131        60
OIR    2025250     91400   17.7900 -111.6700      13.2        60       133        60
OIR    2025250     91400   17.7900 -111.6800      13.4        59       135        60
OIR    2025250     91400   17.7900 -111.6900      13.5        59       137        60
OIR    2025250     91400   17.7900 -111.7000      13.5        59       139        60
OIR    2025250     91400   17.7900 -111.7100      13.5        59       141        60
OIR    2025250     91400   17.7900 -111.7200      13.6        59       142        60
OIR    2025250     91400   17.7900 -111.7300      13.6        59       143        60
OIR    2025250     91400   17.7900 -111.7400      13.6        59       143        60
OIR    2025250     91400   17.7900 -111.7500      13.6        59       141        60
OIR    2025250     91400   17.7900 -111.7600      13.6        58       140        60
OIR    2025250     91400   17.7900 -111.7700      13.6        58       141        60
OIR    2025250     91400   17.7900 -111.7800      13.5        58       142        60
OIR    2025250     91400   17.7900 -111.7900      13.6        58       139        60
OIR    2025250     91400   17.7900 -111.8000      13.6        58       133        60
OIR    2025250     91400   17.7900 -111.8100      13.8        58       132        60
OIR    2025250     91400   17.7900 -111.8200      14.1        58       137        60
OIR    2025250     91400   17.7900 -111.8300      14.3        57       140        60
OIR    2025250     91400   17.7900 -111.8400      14.5        57       139        60
OIR    2025250     91400   17.7900 -111.8500      14.5        57       137        60
OIR    2025250     91400   17.7900 -111.8600      14.4        57       135        60
OIR    2025250     91400   17.7900 -111.8700      14.4        57       134        60
OIR    2025250     91400   17.7900 -111.8800      14.3        56       133        60
OIR    2025250     91400   17.7900 -111.8900      14.3        55       132        60
OIR    2025250     91400   17.7900 -111.9000      14.3        54       131        60
OIR    2025250     91400   17.7900 -111.9100      14.3        53       130        60
OIR    2025250     91400   17.7900 -111.9200      14.4        51       129        60
OIR    2025250     91400   17.7900 -111.9300      14.6        50       130        60
OIR    2025250     91400   17.7900 -111.9400      14.7        50       131        60
OIR    2025250     91400   17.7900 -111.9500      14.7        49       132        60
OIR    2025250     91400   17.7900 -111.9600      14.8        49       134        60
OIR    2025250     91400   17.7900 -111.9700      14.8        49       135        60
OIR    2025250     91400   17.7900 -111.9800      14.8        49       135        60
OIR    2025250     91400   17.7900 -111.9900      14.7        48       135        60
OIR    2025250     91400   17.7900 -112.0000      14.7        48       134        60
OIR    2025250     91400   17.7900 -112.0100      14.7        48       133        60
OIR    2025250     91400   17.7900 -112.0200      14.7        48       133        60
OIR    2025250     91400   17.7900 -112.0300      14.7        48       134        60
OIR    2025250     91400   17.7900 -112.0400      14.6        48       135        60
OIR    2025250     91400   17.7900 -112.0500      14.6        48       133        60
OIR    2025250     91400   17.7900 -112.0600      14.6        48       132        60
OIR    2025250     91400   17.7900 -112.0700      14.6        48       132        60
OIR    2025250     91400   17.7900 -112.0800      14.5        48       133        60
OIR    2025250     91400   17.7900 -112.0900      14.5        48       132        60
OIR    2025250     91400   17.7900 -112.1000      14.5        48       131        60
OIR    2025250     91400   17.7900 -112.1100      14.5        48       130        60
OIR    2025250     91400   17.7900 -112.1200      14.5        47       129        60
OIR    2025250     91400   17.7900 -112.1300      14.5        47       128        60
OIR    2025250     91400   17.7900 -112.1400      14.4        47       126        60
OIR    2025250     91400   17.7900 -112.1500      14.3        47       124        60
OIR    2025250     91400   17.7900 -112.1600      14.3        47       123        60
OIR    2025250     91400   17.7900 -112.1700      14.2        47       123        60
OIR    2025250     91400   17.7900 -112.1800      14.1        47       123        60
OIR    2025250     91400   17.7900 -112.1900      14.0        46       123        60
OIR    2025250     91400   17.7900 -112.2000      13.9        46       123        60
OIR    2025250     91400   17.7900 -112.2100      13.7        46       122        60
OIR    2025250     91400   17.7900 -112.2200      13.3        46       122        60
OIR    2025250     91400   17.7900 -112.2300      13.0        45       122        60
OIR    2025250     91400   17.7900 -112.2400      12.3        43       122        60
OIR    2025250     91400   17.7900 -112.2500      11.8        42       123        60
OIR    2025250     91400   17.7900 -112.2600      11.5        42       122        60
OIR    2025250     91400   17.7900 -112.2700      11.4        41       121        60
OIR    2025250     91400   17.7900 -112.2800      11.4        40       119        60
OIR    2025250     91400   17.7900 -112.2900      11.4        38       117        60
OIR    2025250     91400   17.7900 -112.3000      11.4        37       116        60
OIR    2025250     91400   17.7900 -112.3100      11.4        36       116        60
OIR    2025250     91400   17.7900 -112.3200      11.5        36       116        60
OIR    2025250     91400   17.7900 -112.3300      11.5        35       115        60
OIR    2025250     91400   17.7900 -112.3400      11.5        35       115        60
OIR    2025250     91400   17.7900 -112.3500      11.5        35       113        60
OIR    2025250     91400   17.7900 -112.3600      11.5        34       112        60
OIR    2025250     91400   17.7900 -112.3700      11.5        34       112        60
OIR    2025250     91400   17.7900 -112.3800      11.4        34       113        60
OIR    2025250     91400   17.7900 -112.3900      10.5        34       114        60
OIR    2025250     91400   17.7900 -112.4000       5.4        33       114        60
OIR    2025250     91400   17.7900 -112.4100       9.0       216       115        60
OIR    2025250     91400   17.7900 -112.4200      20.6       213       113        60
OIR    2025250     91400   17.7900 -112.4300      30.9       213       111        60
OIR    2025250     91400   17.7900 -112.4400      36.4       214       109        60
OIR    2025250     91400   17.7900 -112.4500      37.9       214       108        60
OIR    2025250     91400   17.7900 -112.4600      38.0       212       108        60
OIR    2025250     91400   17.7900 -112.4700      37.0       207       110        60
OIR    2025250     91400   17.7900 -112.4800      32.8       190       111        60
OIR    2025250     91400   17.7900 -112.4900      23.5       163       112        60
OIR    2025250     91400   17.7900 -112.5000      14.2       136       112        60
OIR    2025250     91400   17.7900 -112.5100       8.2        81       111        60
OIR    2025250     91400   17.7900 -112.5200       8.1        52       109        60
OIR    2025250     91400   17.7900 -112.5300       8.2        45       107        60
OIR    2025250     91400   17.7900 -112.5400       7.8        42       107        60
OIR    2025250     91400   17.7900 -112.5500       7.2        41       107        60
OIR    2025250     91400   17.7900 -112.5600       7.2        39       108        60
OIR    2025250     91400   17.7900 -112.5700       7.5        35       110        60
OIR    2025250     91400   17.7900 -112.5800       7.6        31       110        60
OIR    2025250     91400   17.7900 -112.5900       7.7        28       111        60
OIR    2025250     91400   17.7900 -112.6000       7.6        27       112        60
OIR    2025250     91400   17.7900 -112.6100       7.5        26       115        60
OIR    2025250     91400   17.7900 -112.6200       7.4        25       116        60
OIR    2025250     91400   17.7900 -112.6300       7.3        25       119        60
OIR    2025250     91400   17.7900 -112.6400       7.3        25       121        60
OIR    2025250     91400   17.7900 -112.6500       7.1        25       122        60
OIR    2025250     91400   17.7900 -112.6600       7.0        25       122        60
OIR    2025250     91400   17.7900 -112.6700       7.0        25       123        60
OIR    2025250     91400   17.7900 -112.6800       6.8        25       124        60
OIR    2025250     91400   17.7900 -112.6900       6.6        26       125        60
OIR    2025250     91400   17.7900 -112.7000       6.5        26       125        60
OIR    2025250     91400   17.7900 -112.7100       6.4        26       125        60
OIR    2025250     91400   17.7900 -112.7200       6.8        26       123        60
OIR    2025250     91400   17.7900 -112.7300       7.1        25       121        60
OIR    2025250     91400   17.7900 -112.7400       6.8        25       120        60
OIR    2025250     91400   17.7900 -112.7500       6.6        25       120        60
OIR    2025250     91400   17.7900 -112.7600       6.4        26       120        60
OIR    2025250     91400   17.7900 -112.7700       5.9        27       119        60
OIR    2025250     91400   17.7900 -112.7800       5.7        29       119        60
OIR    2025250     91400   17.7900 -112.7900       5.6        29       117        60
OIR    2025250     91400   17.7900 -112.8000       5.5        30       117        60
OIR    2025250     91400   17.7900 -112.8100       5.5        30       119        60
OIR    2025250     91400   17.7900 -112.8200       5.6        30       121        60
OIR    2025250     91400   17.7900 -112.8300       5.6        30       123        60
OIR    2025250     91400   17.7900 -112.8400       5.6        30       124        60
OIR    2025250     91400   17.7900 -112.8500       5.7        30       125        60
OIR    2025250     91400   17.7900 -112.8600       5.6        30       124        60
OIR    2025250     91400   17.7900 -112.8700       5.3        30       123        60
OIR    2025250     91400   17.7900 -112.8800       5.1        31       123        60
OIR    2025250     91400   17.7900 -112.8900       5.0        31       124        60
OIR    2025250     91400   17.7900 -112.9000       5.1        32       125        60
OIR    2025250     91400   17.7900 -112.9100       5.5        33       128        60
OIR    2025250     91400   17.7900 -112.9200       6.8        37       129        60
OIR    2025250     91400   17.7900 -112.9300       7.2        37       127        60
OIR    2025250     91400   17.7900 -112.9400       7.2        37       125        60
OIR    2025250     91400   17.7900 -112.9500       7.4        37       123        60
OIR    2025250     91400   17.7900 -112.9600       7.3        34       120        60
OIR    2025250     91400   17.7900 -112.9700       7.2        33       119        60
OIR    2025250     91400   17.7900 -112.9800       6.7        32       119        60
OIR    2025250     91400   17.7900 -112.9900       6.0        30       120        60
OIR    2025250     91400   17.7900 -113.0000       4.8        28       125        60
OIR    2025250     91400   17.7900 -113.3100       4.1        29       126        60
OIR    2025250     91400   17.7900 -113.3200       4.8        24       126        60
OIR    2025250     91400   17.7900 -113.3300       5.5        20       126        60
OIR    2025250     91400   17.7900 -113.3400       6.1        20       127        60
OIR    2025250     91400   17.7900 -113.3500       6.5        19       129        60
OIR    2025250     91400   17.7900 -113.3600       7.0        12       131        60
OIR    2025250     91400   17.7900 -113.3700       7.2        10       134        60
OIR    2025250     91400   17.7900 -113.3800       7.3         9       136        60
OIR    2025250     91400   17.7900 -113.3900       7.4         8       136        60
OIR    2025250     91400   17.7900 -113.4000       7.6         5       135        60
OIR    2025250     91400   17.7900 -113.4100       7.7         4       134        60
OIR    2025250     91400   17.7900 -113.4200       7.7         3       132        60
OIR    2025250     91400   17.7900 -113.4300       7.8         2       132        60
OIR    2025250     91400   17.7900 -113.4400       7.9         2       132        60
OIR    2025250     91400   17.7900 -113.4500       8.0         1       132        60
OIR    2025250     91400   17.7900 -113.4600       8.1       360       131        60
OIR    2025250     91400   17.7900 -113.4700       8.1       359       131        60
OIR    2025250     91400   17.7900 -113.4800       8.2       358       134        60
OIR    2025250     91400   17.7900 -113.4900       8.2       358       136        60
OIR    2025250     91400   17.7900 -113.5000       8.2       358       136        60
OIR    2025250     91400   17.7900 -113.5100       8.2       357       136        60
OIR    2025250     91400   17.7900 -113.5200       8.2       357       135        60
OIR    2025250     91400   17.7900 -113.5300       8.2       357       135        60
OIR    2025250     91400   17.7900 -113.5400       8.2       357       134        60
OIR    2025250     91400   17.7900 -113.5500       8.2       356       133        60
OIR    2025250     91400   17.7900 -113.5600       8.2       356       132        60
OIR    2025250     91400   17.7900 -113.5700       8.2       356       132        60
OIR    2025250     91400   17.7900 -113.5800       8.2       356       132        60
OIR    2025250     91400   17.7900 -113.5900       8.2       356       132        60
OIR    2025250     91400   17.7900 -113.6000       8.2       356       132        60
OIR    2025250     91400   17.7900 -113.6100       8.2       356       133        60
OIR    2025250     91400   17.7900 -113.6200       8.2       356       136        60
OIR    2025250     91400   17.7900 -113.6300       8.2       355       138        60
OIR    2025250     91400   17.7900 -113.6400       8.1       355       136        60
OIR    2025250     91400   17.7900 -113.6500       8.0       354       135        60
OIR    2025250     91400   17.7900 -113.6600       8.0       354       139        60
OIR    2025250     91400   17.7900 -113.6700       7.9       353       143        60
OIR    2025250     91400   17.7900 -113.7200       7.6       353       141        60
OIR    2025250     91400   17.7900 -113.7300       7.6       353       140        60
OIR    2025250     91400   17.7900 -113.7400       7.6       354       139        60
OIR    2025250     91400   17.7900 -113.7500       7.6       354       140        60
OIR    2025250     91400   17.7900 -113.7600       7.5       355       142        60
OIR    2025250     91400   17.7900 -113.7700       7.4       356       140        60
OIR    2025250     91400   17.7900 -113.7800       7.2       358       136        60
OIR    2025250     91400   17.7900 -113.7900       7.1       360       133        60
OIR    2025250     91400   17.7900 -113.8000       7.1         1       131        60
OIR    2025250     91400   17.7900 -113.8100       7.1         1       130        60
OIR    2025250     91400   17.7900 -113.8200       7.1         2       128        60
OIR    2025250     91400   17.7900 -113.8300       7.2         3       126        60
OIR    2025250     91400   17.7900 -113.8400       7.2         3       127        60
OIR    2025250     91400   17.7900 -113.8500       7.2         5       128        60
OIR    2025250     91400   17.7900 -113.8600       7.2         5       130        60
OIR    2025250     91400   17.7900 -113.8700       7.1         5       132        60
OIR    2025250     91400   17.7900 -113.8800       7.1         5       135        60
OIR    2025250     91400   17.7900 -113.8900       7.1         5       138        60
OIR    2025250     91400   17.7900 -113.9000       7.1         5       140        60
OIR    2025250     91400   17.7900 -113.9100       7.0         5       141        60
OIR    2025250     91400   17.7900 -113.9200       7.0         5       141        60
OIR    2025250     91400   17.7900 -113.9700       5.9         4       138        60
OIR    2025250     91400   17.7900 -113.9800       6.2         5       136        60
OIR    2025250     91400   17.7900 -113.9900       6.7         4       134        60
OIR    2025250     91400   17.7900 -114.0000       7.1         2       133        60
OIR    2025250     91400   17.7900 -114.0100       7.3         2       132        60
OIR    2025250     91400   17.7900 -114.0200       7.3         1       133        60
OIR    2025250     91400   17.7900 -114.0300       7.3         1       135        60
OIR    2025250     91400   17.7900 -114.0400       7.3         1       136        60
OIR    2025250     91400   17.7900 -114.0500       7.2         1       138        60
OIR    2025250     91400   17.7900 -114.0600       7.2         1       141        60
OIR    2025250     91400   17.7900 -114.0700       7.2         1       143        60
OIR    2025250     91400   17.7900 -114.0900       7.0       353       143        60
OIR    2025250     91400   17.7900 -114.1000       7.0       352       140        60
OIR    2025250     91400   17.7900 -114.1100       7.0       352       141        60
OIR    2025250     91400   17.7900 -114.1200       7.0       352       141        60
OIR    2025250     91400   17.7900 -114.1300       7.0       352       143        60
OIR    2025250     91400   17.7800 -110.6000      16.3        54       139        60
OIR    2025250     91400   17.7800 -110.6100      16.3        54       137        60
OIR    2025250     91400   17.7800 -110.6200      16.2        54       137        60
OIR    2025250     91400   17.7800 -110.6300      16.1        55       138        60
OIR    2025250     91400   17.7800 -110.6400      15.7        55       137        60
OIR    2025250     91400   17.7800 -110.6500      15.3        56       137        60
OIR    2025250     91400   17.7800 -110.6600      15.0        57       139        60
OIR    2025250     91400   17.7800 -110.6700      14.8        58       143        60
OIR    2025250     91400   17.7800 -110.8300      15.2        60       143        60
OIR    2025250     91400   17.7800 -110.8400      15.1        60       143        60
OIR    2025250     91400   17.7800 -111.6100      12.9        62       142        60
OIR    2025250     91400   17.7800 -111.6200      13.0        62       136        60
OIR    2025250     91400   17.7800 -111.6300      12.9        61       134        60
OIR    2025250     91400   17.7800 -111.6400      12.9        61       133        60
OIR    2025250     91400   17.7800 -111.6500      12.9        61       132        60
OIR    2025250     91400   17.7800 -111.6600      13.0        60       131        60
OIR    2025250     91400   17.7800 -111.6700      13.1        60       132        60
OIR    2025250     91400   17.7800 -111.6800      13.3        59       134        60
OIR    2025250     91400   17.7800 -111.6900      13.5        59       137        60
OIR    2025250     91400   17.7800 -111.7000      13.5        59       138        60
OIR    2025250     91400   17.7800 -111.7100      13.5        59       139        60
OIR    2025250     91400   17.7800 -111.7200      13.6        59       141        60
OIR    2025250     91400   17.7800 -111.7300      13.6        59       142        60
OIR    2025250     91400   17.7800 -111.7400      13.6        58       144        60
OIR    2025250     91400   17.7800 -111.7500      13.6        58       143        60
OIR    2025250     91400   17.7800 -111.7600      13.6        58       143        60
OIR    2025250     91400   17.7800 -111.7700      13.6        58       143        60
OIR    2025250     91400   17.7800 -111.7800      13.6        58       143        60
OIR    2025250     91400   17.7800 -111.7900      13.6        58       142        60
OIR    2025250     91400   17.7800 -111.8000      13.8        58       139        60
OIR    2025250     91400   17.7800 -111.8100      14.1        57       136        60
OIR    2025250     91400   17.7800 -111.8200      14.4        57       138        60
OIR    2025250     91400   17.7800 -111.8300      14.7        57       140        60
OIR    2025250     91400   17.7800 -111.8400      14.8        56       139        60
OIR    2025250     91400   17.7800 -111.8500      14.9        56       137        60
OIR    2025250     91400   17.7800 -111.8600      14.9        56       136        60
OIR    2025250     91400   17.7800 -111.8700      14.8        55       134        60
OIR    2025250     91400   17.7800 -111.8800      14.7        54       132        60
OIR    2025250     91400   17.7800 -111.8900      14.6        52       131        60
OIR    2025250     91400   17.7800 -111.9000      14.7        51       131        60
OIR    2025250     91400   17.7800 -111.9100      14.8        50       130        60
OIR    2025250     91400   17.7800 -111.9200      14.8        49       129        60
OIR    2025250     91400   17.7800 -111.9300      14.8        49       129        60
OIR    2025250     91400   17.7800 -111.9400      14.8        49       131        60
OIR    2025250     91400   17.7800 -111.9500      14.8        49       132        60
OIR    2025250     91400   17.7800 -111.9600      14.8        49       133        60
OIR    2025250     91400   17.7800 -111.9700      14.8        48       134        60
OIR    2025250     91400   17.7800 -111.9800      14.8        48       135        60
OIR    2025250     91400   17.7800 -111.9900      14.8        48       136        60
OIR    2025250     91400   17.7800 -112.0000      14.8        48       135        60
OIR    2025250     91400   17.7800 -112.0100      14.8        48       133        60
OIR    2025250     91400   17.7800 -112.0200      14.8        48       133        60
OIR    2025250     91400   17.7800 -112.0300      14.7        48       134        60
OIR    2025250     91400   17.7800 -112.0400      14.7        48       135        60
OIR    2025250     91400   17.7800 -112.0500      14.6        48       134        60
OIR    2025250     91400   17.7800 -112.0600      14.6        48       132        60
OIR    2025250     91400   17.7800 -112.0700      14.6        48       132        60
OIR    2025250     91400   17.7800 -112.0800      14.5        48       134        60
OIR    2025250     91400   17.7800 -112.0900      14.5        48       134        60
OIR    2025250     91400   17.7800 -112.1000      14.5        48       132        60
OIR    2025250     91400   17.7800 -112.1100      14.5        47       131        60
OIR    2025250     91400   17.7800 -112.1200      14.5        47       129        60
OIR    2025250     91400   17.7800 -112.1300      14.5        47       128        60
OIR    2025250     91400   17.7800 -112.1400      14.5        47       126        60
OIR    2025250     91400   17.7800 -112.1500      14.4        47       124        60
OIR    2025250     91400   17.7800 -112.1600      14.4        47       122        60
OIR    2025250     91400   17.7800 -112.1700      14.4        47       122        60
OIR    2025250     91400   17.7800 -112.1800      14.3        46       121        60
OIR    2025250     91400   17.7800 -112.1900      14.3        46       120        60
OIR    2025250     91400   17.7800 -112.2000      14.2        46       119        60
OIR    2025250     91400   17.7800 -112.2100      14.0        46       120        60
OIR    2025250     91400   17.7800 -112.2200      13.7        46       122        60
OIR    2025250     91400   17.7800 -112.2300      13.4        45       124        60
OIR    2025250     91400   17.7800 -112.2400      13.0        44       124        60
OIR    2025250     91400   17.7800 -112.2500      12.5        43       124        60
OIR    2025250     91400   17.7800 -112.2600      12.1        42       123        60
OIR    2025250     91400   17.7800 -112.2700      11.8        41       123        60
OIR    2025250     91400   17.7800 -112.2800      11.7        39       121        60
OIR    2025250     91400   17.7800 -112.2900      11.6        38       117        60
OIR    2025250     91400   17.7800 -112.3000      11.6        37       115        60
OIR    2025250     91400   17.7800 -112.3100      11.6        36       116        60
OIR    2025250     91400   17.7800 -112.3200      11.6        36       116        60
OIR    2025250     91400   17.7800 -112.3300      11.6        35       116        60
OIR    2025250     91400   17.7800 -112.3400      11.6        35       115        60
OIR    2025250     91400   17.7800 -112.3500      11.6        35       114        60
OIR    2025250     91400   17.7800 -112.3600      11.6        35       113        60
OIR    2025250     91400   17.7800 -112.3700      11.6        35       112        60
OIR    2025250     91400   17.7800 -112.3800      11.5        34       112        60
OIR    2025250     91400   17.7800 -112.3900      11.2        34       112        60
OIR    2025250     91400   17.7800 -112.4000       9.4        35       112        60
OIR    2025250     91400   17.7800 -112.4200       9.4       210       112        60
OIR    2025250     91400   17.7800 -112.4300      19.6       212       110        60
OIR    2025250     91400   17.7800 -112.4400      28.7       212       110        60
OIR    2025250     91400   17.7800 -112.4500      34.2       212       110        60
OIR    2025250     91400   17.7800 -112.4600      34.9       210       111        60
OIR    2025250     91400   17.7800 -112.4700      32.1       202       112        60
OIR    2025250     91400   17.7800 -112.4800      25.6       186       113        60
OIR    2025250     91400   17.7800 -112.4900      13.9       152       113        60
OIR    2025250     91400   17.7800 -112.5000       7.9        92       113        60
OIR    2025250     91400   17.7800 -112.5100       9.4        53       112        60
OIR    2025250     91400   17.7800 -112.5200      10.1        42       111        60
OIR    2025250     91400   17.7800 -112.5300      10.0        39       110        60
OIR    2025250     91400   17.7800 -112.5400      10.0        38       109        60
OIR    2025250     91400   17.7800 -112.5500       9.7        36       109        60
OIR    2025250     91400   17.7800 -112.5600       9.2        35       110        60
OIR    2025250     91400   17.7800 -112.5700       8.9        33       111        60
OIR    2025250     91400   17.7800 -112.5800       8.7        31       112        60
OIR    2025250     91400   17.7800 -112.5900       8.5        29       113        60
OIR    2025250     91400   17.7800 -112.6000       8.3        28       114        60
OIR    2025250     91400   17.7800 -112.6100       8.0        26       116        60
OIR    2025250     91400   17.7800 -112.6200       7.8        26       116        60
OIR    2025250     91400   17.7800 -112.6300       7.7        25       117        60
OIR    2025250     91400   17.7800 -112.6400       7.6        25       120        60
OIR    2025250     91400   17.7800 -112.6500       7.6        25       121        60
OIR    2025250     91400   17.7800 -112.6600       7.6        25       122        60
OIR    2025250     91400   17.7800 -112.6700       7.6        25       123        60
OIR    2025250     91400   17.7800 -112.6800       7.9        26       123        60
OIR    2025250     91400   17.7800 -112.6900       8.7        25       122        60
OIR    2025250     91400   17.7800 -112.7000       9.2        25       124        60
OIR    2025250     91400   17.7800 -112.7100       9.4        25       126        60
OIR    2025250     91400   17.7800 -112.7200       9.2        25       126        60
OIR    2025250     91400   17.7800 -112.7300       8.6        25       126        60
OIR    2025250     91400   17.7800 -112.7400       7.9        24       125        60
OIR    2025250     91400   17.7800 -112.7500       7.5        25       123        60
OIR    2025250     91400   17.7800 -112.7600       7.2        26       121        60
OIR    2025250     91400   17.7800 -112.7700       6.9        27       120        60
OIR    2025250     91400   17.7800 -112.7800       6.4        27       117        60
OIR    2025250     91400   17.7800 -112.7900       5.9        28       117        60
OIR    2025250     91400   17.7800 -112.8000       5.6        29       117        60
OIR    2025250     91400   17.7800 -112.8100       5.6        30       119        60
OIR    2025250     91400   17.7800 -112.8200       5.6        30       120        60
OIR    2025250     91400   17.7800 -112.8300       5.6        30       122        60
OIR    2025250     91400   17.7800 -112.8400       5.7        30       123        60
OIR    2025250     91400   17.7800 -112.8500       5.8        30       124        60
OIR    2025250     91400   17.7800 -112.8600       5.9        30       123        60
OIR    2025250     91400   17.7800 -112.8700       5.8        30       121        60
OIR    2025250     91400   17.7800 -112.8800       5.7        31       121        60
OIR    2025250     91400   17.7800 -112.8900       5.6        31       120        60
OIR    2025250     91400   17.7800 -112.9000       5.9        31       121        60
OIR    2025250     91400   17.7800 -112.9100       6.7        32       124        60
OIR    2025250     91400   17.7800 -112.9200       7.7        34       127        60
OIR    2025250     91400   17.7800 -112.9300       7.9        34       127        60
OIR    2025250     91400   17.7800 -112.9400       7.9        34       126        60
OIR    2025250     91400   17.7800 -112.9500       7.9        33       123        60
OIR    2025250     91400   17.7800 -112.9600       7.8        32       121        60
OIR    2025250     91400   17.7800 -112.9700       7.6        32       120        60
OIR    2025250     91400   17.7800 -112.9800       7.5        32       121        60
OIR    2025250     91400   17.7800 -112.9900       7.3        31       122        60
OIR    2025250     91400   17.7800 -113.0000       6.8        31       125        60
OIR    2025250     91400   17.7800 -113.0100       5.7        33       128        60
OIR    2025250     91400   17.7800 -113.0200       4.2        32       130        60
OIR    2025250     91400   17.7800 -113.3000       4.5        21       129        60
OIR    2025250     91400   17.7800 -113.3100       5.5        17       128        60
OIR    2025250     91400   17.7800 -113.3200       6.2        15       128        60
OIR    2025250     91400   17.7800 -113.3300       6.7        14       128        60
OIR    2025250     91400   17.7800 -113.3400       7.1        14       129        60
OIR    2025250     91400   17.7800 -113.3500       7.3        12       131        60
OIR    2025250     91400   17.7800 -113.3600       7.4        11       132        60
OIR    2025250     91400   17.7800 -113.3700       7.4        10       134        60
OIR    2025250     91400   17.7800 -113.3800       7.4        10       135        60
OIR    2025250     91400   17.7800 -113.3900       7.5         8       134        60
OIR    2025250     91400   17.7800 -113.4000       7.6         6       134        60
OIR    2025250     91400   17.7800 -113.4100       7.6         4       134        60
OIR    2025250     91400   17.7800 -113.4200       7.6         3       133        60
OIR    2025250     91400   17.7800 -113.4300       7.7         3       133        60
OIR    2025250     91400   17.7800 -113.4400       7.8         2       132        60
OIR    2025250     91400   17.7800 -113.4500       7.9         2       132        60
OIR    2025250     91400   17.7800 -113.4600       8.0         0       133        60
OIR    2025250     91400   17.7800 -113.4700       8.1       359       134        60
OIR    2025250     91400   17.7800 -113.4800       8.2       359       136        60
OIR    2025250     91400   17.7800 -113.4900       8.2       358       138        60
OIR    2025250     91400   17.7800 -113.5000       8.2       358       137        60
OIR    2025250     91400   17.7800 -113.5100       8.2       357       136        60
OIR    2025250     91400   17.7800 -113.5200       8.2       357       135        60
OIR    2025250     91400   17.7800 -113.5300       8.2       357       136        60
OIR    2025250     91400   17.7800 -113.5400       8.2       357       135        60
OIR    2025250     91400   17.7800 -113.5500       8.2       357       133        60
OIR    2025250     91400   17.7800 -113.5600       8.2       356       131        60
OIR    2025250     91400   17.7800 -113.5700       8.2       356       132        60
OIR    2025250     91400   17.7800 -113.5800       8.2       356       133        60
OIR    2025250     91400   17.7800 -113.5900       8.2       356       133        60
OIR    2025250     91400   17.7800 -113.6000       8.2       356       130        60
OIR    2025250     91400   17.7800 -113.6100       8.2       356       130        60
OIR    2025250     91400   17.7800 -113.6200       8.2       356       135        60
OIR    2025250     91400   17.7800 -113.6300       8.2       356       139        60
OIR    2025250     91400   17.7800 -113.6400       8.2       355       137        60
OIR    2025250     91400   17.7800 -113.6500       8.1       355       135        60
OIR    2025250     91400   17.7800 -113.6600       8.1       355       140        60
OIR    2025250     91400   17.7800 -113.7200       7.8       353       140        60
OIR    2025250     91400   17.7800 -113.7300       7.7       354       140        60
OIR    2025250     91400   17.7800 -113.7400       7.7       354       140        60
OIR    2025250     91400   17.7800 -113.7500       7.7       354       141        60
OIR    2025250     91400   17.7800 -113.7600       7.6       355       141        60
OIR    2025250     91400   17.7800 -113.7700       7.5       356       140        60
OIR    2025250     91400   17.7800 -113.7800       7.4       357       138        60
OIR    2025250     91400   17.7800 -113.7900       7.3       359       136        60
OIR    2025250     91400   17.7800 -113.8000       7.3         0       135        60
OIR    2025250     91400   17.7800 -113.8100       7.2         1       134        60
OIR    2025250     91400   17.7800 -113.8200       7.2         1       133        60
OIR    2025250     91400   17.7800 -113.8300       7.2         2       132        60
OIR    2025250     91400   17.7800 -113.8400       7.2         3       130        60
OIR    2025250     91400   17.7800 -113.8500       7.2         4       130        60
OIR    2025250     91400   17.7800 -113.8600       7.2         4       130        60
OIR    2025250     91400   17.7800 -113.8700       7.2         5       131        60
OIR    2025250     91400   17.7800 -113.8800       7.2         5       132        60
OIR    2025250     91400   17.7800 -113.8900       7.2         5       133        60
OIR    2025250     91400   17.7800 -113.9000       7.2         5       135        60
OIR    2025250     91400   17.7800 -113.9100       7.1         5       137        60
OIR    2025250     91400   17.7800 -113.9200       7.1         5       140        60
OIR    2025250     91400   17.7800 -113.9800       7.3         1       139        60
OIR    2025250     91400   17.7800 -113.9900       7.2         1       135        60
OIR    2025250     91400   17.7800 -114.0000       7.3         1       133        60
OIR    2025250     91400   17.7800 -114.0100       7.3         1       132        60
OIR    2025250     91400   17.7800 -114.0200       7.3         1       132        60
OIR    2025250     91400   17.7800 -114.0300       7.3         1       134        60
OIR    2025250     91400   17.7800 -114.0400       7.2         1       136        60
OIR    2025250     91400   17.7800 -114.0500       7.2         1       138        60
OIR    2025250     91400   17.7800 -114.0600       7.2         1       139        60
OIR    2025250     91400   17.7800 -114.0700       7.2         1       141        60
OIR    2025250     91400   17.7800 -114.0900       7.0       353       142        60
OIR    2025250     91400   17.7800 -114.1000       7.0       353       140        60
OIR    2025250     91400   17.7800 -114.1100       7.0       352       140        60
OIR    2025250     91400   17.7800 -114.1200       7.0       352       141        60
OIR    2025250     91400   17.7800 -114.1300       7.1       352       142        60
OIR    2025250     91400   17.7800 -114.1900       7.6       346       143        60
OIR    2025250     91400   17.7700 -110.5900      16.3        54       143        60
OIR    2025250     91400   17.7700 -110.6000      16.3        54       139        60
OIR    2025250     91400   17.7700 -110.6100      16.3        54       135        60
OIR    2025250     91400   17.7700 -110.6200      16.2        55       134        60
OIR    2025250     91400   17.7700 -110.6300      16.1        55       132        60
OIR    2025250     91400   17.7700 -110.6400      15.6        56       133        60
OIR    2025250     91400   17.7700 -110.6500      15.2        57       135        60
OIR    2025250     91400   17.7700 -110.6600      14.9        58       138        60
OIR    2025250     91400   17.7700 -110.6700      14.7        59       140        60
OIR    2025250     91400   17.7700 -110.6800      14.7        59       143        60
OIR    2025250     91400   17.7700 -110.7500      15.0        61       143        60
OIR    2025250     91400   17.7700 -111.6200      12.5        61       141        60
OIR    2025250     91400   17.7700 -111.6300      12.6        61       138        60
OIR    2025250     91400   17.7700 -111.6400      12.7        61       135        60
OIR    2025250     91400   17.7700 -111.6500      12.7        61       133        60
OIR    2025250     91400   17.7700 -111.6600      12.8        60       132        60
OIR    2025250     91400   17.7700 -111.6700      13.0        60       130        60
OIR    2025250     91400   17.7700 -111.6800      13.3        59       133        60
OIR    2025250     91400   17.7700 -111.6900      13.5        59       136        60
OIR    2025250     91400   17.7700 -111.7000      13.5        59       138        60
OIR    2025250     91400   17.7700 -111.7100      13.6        59       139        60
OIR    2025250     91400   17.7700 -111.7200      13.6        59       141        60
OIR    2025250     91400   17.7700 -111.7300      13.6        58       142        60
OIR    2025250     91400   17.7700 -111.7400      13.6        58       144        60
OIR    2025250     91400   17.7700 -111.8000      14.1        57       143        60
OIR    2025250     91400   17.7700 -111.8100      14.5        56       141        60
OIR    2025250     91400   17.7700 -111.8200      14.8        56       140        60
OIR    2025250     91400   17.7700 -111.8300      15.0        56       140        60
OIR    2025250     91400   17.7700 -111.8400      15.0        56       139        60
OIR    2025250     91400   17.7700 -111.8500      15.0        56       138        60
OIR    2025250     91400   17.7700 -111.8600      15.0        55       136        60
OIR    2025250     91400   17.7700 -111.8700      15.0        55       134        60
OIR    2025250     91400   17.7700 -111.8800      14.9        53       132        60
OIR    2025250     91400   17.7700 -111.8900      14.8        51       131        60
OIR    2025250     91400   17.7700 -111.9000      14.9        50       129        60
OIR    2025250     91400   17.7700 -111.9100      14.9        49       129        60
OIR    2025250     91400   17.7700 -111.9200      14.9        49       129        60
OIR    2025250     91400   17.7700 -111.9300      14.9        49       129        60
OIR    2025250     91400   17.7700 -111.9400      14.9        49       130        60
OIR    2025250     91400   17.7700 -111.9500      14.9        48       131        60
OIR    2025250     91400   17.7700 -111.9600      14.9        48       132        60
OIR    2025250     91400   17.7700 -111.9700      14.9        48       132        60
OIR    2025250     91400   17.7700 -111.9800      14.9        48       134        60
OIR    2025250     91400   17.7700 -111.9900      14.9        48       135        60
OIR    2025250     91400   17.7700 -112.0000      14.9        48       135        60
OIR    2025250     91400   17.7700 -112.0100      14.8        48       134        60
OIR    2025250     91400   17.7700 -112.0200      14.8        48       132        60
OIR    2025250     91400   17.7700 -112.0300      14.8        48       133        60
OIR    2025250     91400   17.7700 -112.0400      14.7        48       134        60
OIR    2025250     91400   17.7700 -112.0500      14.6        48       133        60
OIR    2025250     91400   17.7700 -112.0600      14.6        48       133        60
OIR    2025250     91400   17.7700 -112.0700      14.6        47       133        60
OIR    2025250     91400   17.7700 -112.0800      14.5        47       134        60
OIR    2025250     91400   17.7700 -112.0900      14.5        47       136        60
OIR    2025250     91400   17.7700 -112.1000      14.5        47       136        60
OIR    2025250     91400   17.7700 -112.1100      14.6        47       135        60
OIR    2025250     91400   17.7700 -112.1200      14.6        47       133        60
OIR    2025250     91400   17.7700 -112.1300      14.6        47       130        60
OIR    2025250     91400   17.7700 -112.1400      14.5        47       128        60
OIR    2025250     91400   17.7700 -112.1500      14.5        47       126        60
OIR    2025250     91400   17.7700 -112.1600      14.4        47       123        60
OIR    2025250     91400   17.7700 -112.1700      14.4        47       123        60
OIR    2025250     91400   17.7700 -112.1800      14.4        46       123        60
OIR    2025250     91400   17.7700 -112.1900      14.4        46       122        60
OIR    2025250     91400   17.7700 -112.2000      14.4        46       120        60
OIR    2025250     91400   17.7700 -112.2100      14.3        46       120        60
OIR    2025250     91400   17.7700 -112.2200      14.0        46       122        60
OIR    2025250     91400   17.7700 -112.2300      13.7        45       124        60
OIR    2025250     91400   17.7700 -112.2400      13.3        44       125        60
OIR    2025250     91400   17.7700 -112.2500      12.8        43       125        60
OIR    2025250     91400   17.7700 -112.2600      12.5        42       124        60
OIR    2025250     91400   17.7700 -112.2700      12.2        41       124        60
OIR    2025250     91400   17.7700 -112.2800      12.0        39       122        60
OIR    2025250     91400   17.7700 -112.2900      11.9        38       119        60
OIR    2025250     91400   17.7700 -112.3000      11.8        37       116        60
OIR    2025250     91400   17.7700 -112.3100      11.7        36       116        60
OIR    2025250     91400   17.7700 -112.3200      11.7        36       116        60
OIR    2025250     91400   17.7700 -112.3300      11.7        35       116        60
OIR    2025250     91400   17.7700 -112.3400      11.6        35       116        60
OIR    2025250     91400   17.7700 -112.3500      11.6        35       115        60
OIR    2025250     91400   17.7700 -112.3600      11.6        35       113        60
OIR    2025250     91400   17.7700 -112.3700      11.6        35       112        60
OIR    2025250     91400   17.7700 -112.3800      11.6        35       111        60
OIR    2025250     91400   17.7700 -112.3900      11.6        35       111        60
OIR    2025250     91400   17.7700 -112.4000      11.4        35       111        60
OIR    2025250     91400   17.7700 -112.4100       9.8        34       111        60
OIR    2025250     91400   17.7700 -112.4200       5.6        34       111        60
OIR    2025250     91400   17.7700 -112.4400       8.5       215       109        60
OIR    2025250     91400   17.7700 -112.4500      14.5       214       111        60
OIR    2025250     91400   17.7700 -112.4600      18.6       211       113        60
OIR    2025250     91400   17.7700 -112.4700      16.1       202       113        60
OIR    2025250     91400   17.7700 -112.4800       7.6       176       114        60
OIR    2025250     91400   17.7700 -112.4900       6.7        61       114        60
OIR    2025250     91400   17.7700 -112.5000      10.5        45       114        60
OIR    2025250     91400   17.7700 -112.5100      11.6        40       114        60
OIR    2025250     91400   17.7700 -112.5200      11.7        37       113        60
OIR    2025250     91400   17.7700 -112.5300      11.4        36       112        60
OIR    2025250     91400   17.7700 -112.5400      11.2        36       112        60
OIR    2025250     91400   17.7700 -112.5500      10.8        35       111        60
OIR    2025250     91400   17.7700 -112.5600      10.2        34       111        60
OIR    2025250     91400   17.7700 -112.5700       9.8        33       113        60
OIR    2025250     91400   17.7700 -112.5800       9.6        31       114        60
OIR    2025250     91400   17.7700 -112.5900       9.5        30       116        60
OIR    2025250     91400   17.7700 -112.6000       9.1        28       117        60
OIR    2025250     91400   17.7700 -112.6100       8.6        27       116        60
OIR    2025250     91400   17.7700 -112.6200       8.2        26       116        60
OIR    2025250     91400   17.7700 -112.6300       7.9        26       117        60
OIR    2025250     91400   17.7700 -112.6400       7.8        26       117        60
OIR    2025250     91400   17.7700 -112.6500       7.8        25       119        60
OIR    2025250     91400   17.7700 -112.6600       7.9        25       119        60
OIR    2025250     91400   17.7700 -112.6700       8.1        25       120        60
OIR    2025250     91400   17.7700 -112.6800       8.5        26       117        60
OIR    2025250     91400   17.7700 -112.6900       9.1        26       116        60
OIR    2025250     91400   17.7700 -112.7000       9.3        25       119        60
OIR    2025250     91400   17.7700 -112.7100       9.4        25       123        60
OIR    2025250     91400   17.7700 -112.7200       9.4        25       125        60
OIR    2025250     91400   17.7700 -112.7300       9.3        25       127        60
OIR    2025250     91400   17.7700 -112.7400       8.9        24       127        60
OIR    2025250     91400   17.7700 -112.7500       8.5        24       125        60
OIR    2025250     91400   17.7700 -112.7600       8.0        25       123        60
OIR    2025250     91400   17.7700 -112.7700       7.6        26       120        60
OIR    2025250     91400   17.7700 -112.7800       7.2        27       116        60
OIR    2025250     91400   17.7700 -112.7900       6.7        27       116        60
OIR    2025250     91400   17.7700 -112.8000       6.1        29       119        60
OIR    2025250     91400   17.7700 -112.8100       5.7        30       121        60
OIR    2025250     91400   17.7700 -112.8200       5.7        30       119        60
OIR    2025250     91400   17.7700 -112.8300       5.8        30       117        60
OIR    2025250     91400   17.7700 -112.8400       6.2        29       119        60
OIR    2025250     91400   17.7700 -112.8500       6.6        29       120        60
OIR    2025250     91400   17.7700 -112.8600       6.8        29       119        60
OIR    2025250     91400   17.7700 -112.8700       6.8        30       119        60
OIR    2025250     91400   17.7700 -112.8800       6.8        30       119        60
OIR    2025250     91400   17.7700 -112.8900       6.8        29       120        60
OIR    2025250     91400   17.7700 -112.9000       7.1        29       121        60
OIR    2025250     91400   17.7700 -112.9100       7.7        31       124        60
OIR    2025250     91400   17.7700 -112.9200       8.1        32       127        60
OIR    2025250     91400   17.7700 -112.9300       8.2        32       127        60
OIR    2025250     91400   17.7700 -112.9400       8.2        32       126        60
OIR    2025250     91400   17.7700 -112.9500       8.1        32       125        60
OIR    2025250     91400   17.7700 -112.9600       8.0        31       123        60
OIR    2025250     91400   17.7700 -112.9700       7.9        31       122        60
OIR    2025250     91400   17.7700 -112.9800       7.8        31       122        60
OIR    2025250     91400   17.7700 -112.9900       7.7        31       123        60
OIR    2025250     91400   17.7700 -113.0000       7.5        31       125        60
OIR    2025250     91400   17.7700 -113.0100       6.9        33       126        60
OIR    2025250     91400   17.7700 -113.0200       5.5        33       128        60
OIR    2025250     91400   17.7700 -113.0300       4.5        27       130        60
OIR    2025250     91400   17.7700 -113.0400       4.5        23       132        60
OIR    2025250     91400   17.7700 -113.0500       4.6        20       131        60
OIR    2025250     91400   17.7700 -113.0600       4.6        20       131        60
OIR    2025250     91400   17.7700 -113.0700       4.6        21       132        60
OIR    2025250     91400   17.7700 -113.0800       4.5        22       132        60
OIR    2025250     91400   17.7700 -113.0900       4.3        23       132        60
OIR    2025250     91400   17.7700 -113.1000       4.0        23       132        60
OIR    2025250     91400   17.7700 -113.2300       4.2        35       138        60
OIR    2025250     91400   17.7700 -113.2400       4.4        34       140        60
OIR    2025250     91400   17.7700 -113.2500       4.6        33       140        60
OIR    2025250     91400   17.7700 -113.2600       4.5        31       139        60
OIR    2025250     91400   17.7700 -113.2700       4.4        27       137        60
OIR    2025250     91400   17.7700 -113.2800       4.5        24       134        60
OIR    2025250     91400   17.7700 -113.2900       4.8        21       132        60
OIR    2025250     91400   17.7700 -113.3000       5.6        15       131        60
OIR    2025250     91400   17.7700 -113.3100       6.7        12       130        60
OIR    2025250     91400   17.7700 -113.3200       7.2        12       130        60
OIR    2025250     91400   17.7700 -113.3300       7.4        12       129        60
OIR    2025250     91400   17.7700 -113.3400       7.4        12       130        60
OIR    2025250     91400   17.7700 -113.3500       7.4        12       132        60
OIR    2025250     91400   17.7700 -113.3600       7.4        11       133        60
OIR    2025250     91400   17.7700 -113.3700       7.4        11       132        60
OIR    2025250     91400   17.7700 -113.3800       7.4        10       131        60
OIR    2025250     91400   17.7700 -113.3900       7.5         8       131        60
OIR    2025250     91400   17.7700 -113.4000       7.6         6       132        60
OIR    2025250     91400   17.7700 -113.4100       7.6         5       133        60
OIR    2025250     91400   17.7700 -113.4200       7.6         4       135        60
OIR    2025250     91400   17.7700 -113.4300       7.6         3       136        60
OIR    2025250     91400   17.7700 -113.4400       7.7         3       136        60
OIR    2025250     91400   17.7700 -113.4500       7.8         2       137        60
OIR    2025250     91400   17.7700 -113.4600       8.0         1       138        60
OIR    2025250     91400   17.7700 -113.4700       8.1         0       140        60
OIR    2025250     91400   17.7700 -113.4800       8.2       359       139        60
OIR    2025250     91400   17.7700 -113.4900       8.2       359       138        60
OIR    2025250     91400   17.7700 -113.5000       8.3       358       138        60
OIR    2025250     91400   17.7700 -113.5100       8.3       358       139        60
OIR    2025250     91400   17.7700 -113.5200       8.2       357       138        60
OIR    2025250     91400   17.7700 -113.5300       8.2       357       138        60
OIR    2025250     91400   17.7700 -113.5400       8.2       357       137        60
OIR    2025250     91400   17.7700 -113.5500       8.2       357       134        60
OIR    2025250     91400   17.7700 -113.5600       8.2       356       131        60
OIR    2025250     91400   17.7700 -113.5700       8.2       356       132        60
OIR    2025250     91400   17.7700 -113.5800       8.2       356       133        60
OIR    2025250     91400   17.7700 -113.5900       8.2       356       133        60
OIR    2025250     91400   17.7700 -113.6000       8.2       356       130        60
OIR    2025250     91400   17.7700 -113.6100       8.2       356       129        60
OIR    2025250     91400   17.7700 -113.6200       8.2       356       132        60
OIR    2025250     91400   17.7700 -113.6300       8.2       356       136        60
OIR    2025250     91400   17.7700 -113.6400       8.2       356       136        60
OIR    2025250     91400   17.7700 -113.6500       8.2       356       135        60
OIR    2025250     91400   17.7700 -113.6600       8.1       355       139        60
OIR    2025250     91400   17.7700 -113.7200       7.9       354       141        60
OIR    2025250     91400   17.7700 -113.7300       7.8       354       140        60
OIR    2025250     91400   17.7700 -113.7400       7.8       355       141        60
OIR    2025250     91400   17.7700 -113.7500       7.7       355       141        60
OIR    2025250     91400   17.7700 -113.7600       7.7       355       140        60
OIR    2025250     91400   17.7700 -113.7700       7.6       356       139        60
OIR    2025250     91400   17.7700 -113.7800       7.5       357       138        60
OIR    2025250     91400   17.7700 -113.7900       7.4       358       138        60
OIR    2025250     91400   17.7700 -113.8000       7.4       360       137        60
OIR    2025250     91400   17.7700 -113.8100       7.3         1       135        60
OIR    2025250     91400   17.7700 -113.8200       7.3         1       135        60
OIR    2025250     91400   17.7700 -113.8300       7.3         2       135        60
OIR    2025250     91400   17.7700 -113.8400       7.3         2       133        60
OIR    2025250     91400   17.7700 -113.8500       7.3         3       130        60
OIR    2025250     91400   17.7700 -113.8600       7.3         4       130        60
OIR    2025250     91400   17.7700 -113.8700       7.2         4       130        60
OIR    2025250     91400   17.7700 -113.8800       7.2         4       131        60
OIR    2025250     91400   17.7700 -113.8900       7.2         4       131        60
OIR    2025250     91400   17.7700 -113.9000       7.2         4       131        60
OIR    2025250     91400   17.7700 -113.9100       7.2         4       133        60
OIR    2025250     91400   17.7700 -113.9200       7.1         4       138        60
OIR    2025250     91400   17.7700 -113.9300       7.1         4       142        60
OIR    2025250     91400   17.7700 -113.9900       7.3         0       138        60
OIR    2025250     91400   17.7700 -114.0000       7.3         1       135        60
OIR    2025250     91400   17.7700 -114.0100       7.3         1       134        60
OIR    2025250     91400   17.7700 -114.0200       7.3         1       133        60
OIR    2025250     91400   17.7700 -114.0300       7.3         1       135        60
OIR    2025250     91400   17.7700 -114.0400       7.2         1       138        60
OIR    2025250     91400   17.7700 -114.0500       7.2         1       138        60
OIR    2025250     91400   17.7700 -114.0600       7.2         1       137        60
OIR    2025250     91400   17.7700 -114.0700       7.2       360       140        60
OIR    2025250     91400   17.7700 -114.0800       7.1       355       143        60
OIR    2025250     91400   17.7600 -110.6000      16.3        54       141        60
OIR    2025250     91400   17.7600 -110.6100      16.3        55       135        60
OIR    2025250     91400   17.7600 -110.6200      16.2        55       134        60
OIR    2025250     91400   17.7600 -110.6300      16.0        56       132        60
OIR    2025250     91400   17.7600 -110.6400      15.5        58       132        60
OIR    2025250     91400   17.7600 -110.6500      15.2        59       135        60
OIR    2025250     91400   17.7600 -110.6600      14.9        59       137        60
OIR    2025250     91400   17.7600 -110.6700      14.8        60       138        60
OIR    2025250     91400   17.7600 -110.6800      14.7        60       140        60
OIR    2025250     91400   17.7600 -110.6900      14.8        60       140        60
OIR    2025250     91400   17.7600 -110.7000      14.8        61       140        60
OIR    2025250     91400   17.7600 -110.7100      14.9        61       141        60
OIR    2025250     91400   17.7600 -110.7200      15.0        61       140        60
OIR    2025250     91400   17.7600 -110.7300      15.0        61       139        60
OIR    2025250     91400   17.7600 -110.7400      14.9        61       140        60
OIR    2025250     91400   17.7600 -110.7500      14.9        61       141        60
OIR    2025250     91400   17.7600 -111.3000      17.8        60       143        60
OIR    2025250     91400   17.7600 -111.3100      17.8        60       136        60
OIR    2025250     91400   17.7600 -111.3200      17.6        60       131        60
OIR    2025250     91400   17.7600 -111.3300      17.6        60       133        60
OIR    2025250     91400   17.7600 -111.3400      17.6        60       134        60
OIR    2025250     91400   17.7600 -111.3500      17.6        60       136        60
OIR    2025250     91400   17.7600 -111.3600      17.6        60       139        60
OIR    2025250     91400   17.7600 -111.3700      17.6        60       139        60
OIR    2025250     91400   17.7600 -111.3800      17.7        60       134        60
OIR    2025250     91400   17.7600 -111.3900      17.7        60       129        60
OIR    2025250     91400   17.7600 -111.4000      17.6        59       132        60
OIR    2025250     91400   17.7600 -111.4100      17.4        60       135        60
OIR    2025250     91400   17.7600 -111.4200      16.9        60       141        60
OIR    2025250     91400   17.7600 -111.6400      12.2        60       140        60
OIR    2025250     91400   17.7600 -111.6500      12.5        60       135        60
OIR    2025250     91400   17.7600 -111.6600      12.6        60       132        60
OIR    2025250     91400   17.7600 -111.6700      12.9        59       130        60
OIR    2025250     91400   17.7600 -111.6800      13.2        59       131        60
OIR    2025250     91400   17.7600 -111.6900      13.4        59       134        60
OIR    2025250     91400   17.7600 -111.7000      13.5        59       138        60
OIR    2025250     91400   17.7600 -111.7100      13.6        58       142        60
OIR    2025250     91400   17.7600 -111.7800      13.9        57       143        60
OIR    2025250     91400   17.7600 -111.7900      14.1        57       142        60
OIR    2025250     91400   17.7600 -111.8000      14.4        56       143        60
OIR    2025250     91400   17.7600 -111.8100      14.7        56       144        60
OIR    2025250     91400   17.7600 -111.8300      15.1        56       144        60
OIR    2025250     91400   17.7600 -111.8400      15.1        55       142        60
OIR    2025250     91400   17.7600 -111.8500      15.1        55       138        60
OIR    2025250     91400   17.7600 -111.8600      15.1        55       135        60
OIR    2025250     91400   17.7600 -111.8700      15.1        55       134        60
OIR    2025250     91400   17.7600 -111.8800      14.9        52       132        60
OIR    2025250     91400   17.7600 -111.8900      14.9        50       132        60
OIR    2025250     91400   17.7600 -111.9000      15.0        49       132        60
OIR    2025250     91400   17.7600 -111.9100      15.0        49       132        60
OIR    2025250     91400   17.7600 -111.9200      15.0        48       131        60
OIR    2025250     91400   17.7600 -111.9300      14.9        48       130        60
OIR    2025250     91400   17.7600 -111.9400      14.9        48       131        60
OIR    2025250     91400   17.7600 -111.9500      14.9        48       132        60
OIR    2025250     91400   17.7600 -111.9600      14.9        48       134        60
OIR    2025250     91400   17.7600 -111.9700      14.9        48       135        60
OIR    2025250     91400   17.7600 -111.9800      14.9        48       137        60
OIR    2025250     91400   17.7600 -111.9900      14.9        48       138        60
OIR    2025250     91400   17.7600 -112.0000      14.9        48       139        60
OIR    2025250     91400   17.7600 -112.0100      14.9        48       136        60
OIR    2025250     91400   17.7600 -112.0200      14.9        48       134        60
OIR    2025250     91400   17.7600 -112.0300      14.8        48       133        60
OIR    2025250     91400   17.7600 -112.0400      14.7        48       133        60
OIR    2025250     91400   17.7600 -112.0500      14.6        47       133        60
OIR    2025250     91400   17.7600 -112.0600      14.6        47       134        60
OIR    2025250     91400   17.7600 -112.0700      14.6        47       134        60
OIR    2025250     91400   17.7600 -112.0800      14.6        47       136        60
OIR    2025250     91400   17.7600 -112.0900      14.6        47       137        60
OIR    2025250     91400   17.7600 -112.1000      14.6        47       138        60
OIR    2025250     91400   17.7600 -112.1100      14.6        47       139        60
OIR    2025250     91400   17.7600 -112.1200      14.6        47       137        60
OIR    2025250     91400   17.7600 -112.1300      14.6        47       133        60
OIR    2025250     91400   17.7600 -112.1400      14.5        47       129        60
OIR    2025250     91400   17.7600 -112.1500      14.5        47       127        60
OIR    2025250     91400   17.7600 -112.1600      14.5        47       125        60
OIR    2025250     91400   17.7600 -112.1700      14.5        47       125        60
OIR    2025250     91400   17.7600 -112.1800      14.5        47       125        60
OIR    2025250     91400   17.7600 -112.1900      14.5        46       124        60
OIR    2025250     91400   17.7600 -112.2000      14.4        46       122        60
OIR    2025250     91400   17.7600 -112.2100      14.4        46       121        60
OIR    2025250     91400   17.7600 -112.2200      14.3        46       123        60
OIR    2025250     91400   17.7600 -112.2300      14.1        45       124        60
OIR    2025250     91400   17.7600 -112.2400      13.6        45       125        60
OIR    2025250     91400   17.7600 -112.2500      13.1        43       126        60
OIR    2025250     91400   17.7600 -112.2600      12.7        42       126        60
OIR    2025250     91400   17.7600 -112.2700      12.5        40       124        60
OIR    2025250     91400   17.7600 -112.2800      12.3        39       122        60
OIR    2025250     91400   17.7600 -112.2900      12.1        38       120        60
OIR    2025250     91400   17.7600 -112.3000      12.0        37       117        60
OIR    2025250     91400   17.7600 -112.3100      11.9        36       117        60
OIR    2025250     91400   17.7600 -112.3200      11.8        36       119        60
OIR    2025250     91400   17.7600 -112.3300      11.7        35       119        60
OIR    2025250     91400   17.7600 -112.3400      11.7        35       117        60
OIR    2025250     91400   17.7600 -112.3500      11.6        35       117        60
OIR    2025250     91400   17.7600 -112.3600      11.6        35       115        60
OIR    2025250     91400   17.7600 -112.3700      11.6        35       112        60
OIR    2025250     91400   17.7600 -112.3800      11.6        35       111        60
OIR    2025250     91400   17.7600 -112.3900      11.6        35       110        60
OIR    2025250     91400   17.7600 -112.4000      11.6        34       110        60
OIR    2025250     91400   17.7600 -112.4100      11.5        34       110        60
OIR    2025250     91400   17.7600 -112.4200      11.0        34       110        60
OIR    2025250     91400   17.7600 -112.4300       9.9        35       109        60
OIR    2025250     91400   17.7600 -112.4400       9.1        37       109        60
OIR    2025250     91400   17.7600 -112.4500       9.1        36       110        60
OIR    2025250     91400   17.7600 -112.4600       9.4        35       111        60
OIR    2025250     91400   17.7600 -112.4700      10.6        35       113        60
OIR    2025250     91400   17.7600 -112.4800      11.2        35       114        60
OIR    2025250     91400   17.7600 -112.4900      11.8        36       115        60
OIR    2025250     91400   17.7600 -112.5000      12.2        36       116        60
OIR    2025250     91400   17.7600 -112.5100      12.3        36       116        60
OIR    2025250     91400   17.7600 -112.5200      12.3        35       116        60
OIR    2025250     91400   17.7600 -112.5300      12.3        35       116        60
OIR    2025250     91400   17.7600 -112.5400      12.2        35       116        60
OIR    2025250     91400   17.7600 -112.5500      12.1        34       115        60
OIR    2025250     91400   17.7600 -112.5600      11.6        33       114        60
OIR    2025250     91400   17.7600 -112.5700      11.4        32       114        60
OIR    2025250     91400   17.7600 -112.5800      11.1        32       115        60
OIR    2025250     91400   17.7600 -112.5900      10.7        31       116        60
OIR    2025250     91400   17.7600 -112.6000      10.2        30       120        60
OIR    2025250     91400   17.7600 -112.6100       9.6        30       120        60
OIR    2025250     91400   17.7600 -112.6200       8.9        28       119        60
OIR    2025250     91400   17.7600 -112.6300       8.5        27       119        60
OIR    2025250     91400   17.7600 -112.6400       8.3        27       119        60
OIR    2025250     91400   17.7600 -112.6500       8.2        26       120        60
OIR    2025250     91400   17.7600 -112.6600       8.3        26       119        60
OIR    2025250     91400   17.7600 -112.6700       8.5        26       116        60
OIR    2025250     91400   17.7600 -112.6800       8.9        26       116        60
OIR    2025250     91400   17.7600 -112.6900       9.3        26       116        60
OIR    2025250     91400   17.7600 -112.7000       9.5        25       119        60
OIR    2025250     91400   17.7600 -112.7100       9.5        25       122        60
OIR    2025250     91400   17.7600 -112.7200       9.5        25       125        60
OIR    2025250     91400   17.7600 -112.7300       9.4        24       127        60
OIR    2025250     91400   17.7600 -112.7400       9.4        24       128        60
OIR    2025250     91400   17.7600 -112.7500       9.2        24       127        60
OIR    2025250     91400   17.7600 -112.7600       9.0        25       124        60
OIR    2025250     91400   17.7600 -112.7700       8.8        25       121        60
OIR    2025250     91400   17.7600 -112.7800       8.4        26       116        60
OIR    2025250     91400   17.7600 -112.7900       8.0        26       116        60
OIR    2025250     91400   17.7600 -112.8000       7.4        27       120        60
OIR    2025250     91400   17.7600 -112.8100       6.7        29       122        60
OIR    2025250     91400   17.7600 -112.8200       6.4        29       119        60
OIR    2025250     91400   17.7600 -112.8300       6.9        29       116        60
OIR    2025250     91400   17.7600 -112.8400       8.1        27       115        60
OIR    2025250     91400   17.7600 -112.8500       8.5        28       115        60
OIR    2025250     91400   17.7600 -112.8600       8.6        28       115        60
OIR    2025250     91400   17.7600 -112.8700       8.5        28       116        60
OIR    2025250     91400   17.7600 -112.8800       8.4        28       117        60
OIR    2025250     91400   17.7600 -112.8900       8.2        28       120        60
OIR    2025250     91400   17.7600 -112.9000       8.2        28       123        60
OIR    2025250     91400   17.7600 -112.9100       8.3        30       124        60
OIR    2025250     91400   17.7600 -112.9200       8.4        30       126        60
OIR    2025250     91400   17.7600 -112.9300       8.4        31       127        60
OIR    2025250     91400   17.7600 -112.9400       8.4        31       127        60
OIR    2025250     91400   17.7600 -112.9500       8.4        31       127        60
OIR    2025250     91400   17.7600 -112.9600       8.3        31       125        60
OIR    2025250     91400   17.7600 -112.9700       8.1        31       124        60
OIR    2025250     91400   17.7600 -112.9800       8.0        31       124        60
OIR    2025250     91400   17.7600 -112.9900       7.9        31       124        60
OIR    2025250     91400   17.7600 -113.0000       7.8        31       124        60
OIR    2025250     91400   17.7600 -113.0100       7.6        32       125        60
OIR    2025250     91400   17.7600 -113.0200       6.5        32       126        60
OIR    2025250     91400   17.7600 -113.0300       5.0        25       128        60
OIR    2025250     91400   17.7600 -113.0400       4.8        22       130        60
OIR    2025250     91400   17.7600 -113.0500       4.8        21       132        60
OIR    2025250     91400   17.7600 -113.0600       4.8        21       135        60
OIR    2025250     91400   17.7600 -113.0700       4.8        21       135        60
OIR    2025250     91400   17.7600 -113.0800       4.8        21       135        60
OIR    2025250     91400   17.7600 -113.0900       4.8        21       135        60
OIR    2025250     91400   17.7600 -113.1000       4.7        21       136        60
OIR    2025250     91400   17.7600 -113.1100       4.5        21       136        60
OIR    2025250     91400   17.7600 -113.1200       4.4        21       137        60
OIR    2025250     91400   17.7600 -113.1300       4.2        22       137        60
OIR    2025250     91400   17.7600 -113.2200       4.1        31       134        60
OIR    2025250     91400   17.7600 -113.2300       4.3        32       136        60
OIR    2025250     91400   17.7600 -113.2400       4.6        31       138        60
OIR    2025250     91400   17.7600 -113.2500       4.7        30       139        60
OIR    2025250     91400   17.7600 -113.2600       4.7        28       139        60
OIR    2025250     91400   17.7600 -113.2700       4.8        25       138        60
OIR    2025250     91400   17.7600 -113.2800       5.0        21       136        60
OIR    2025250     91400   17.7600 -113.2900       5.3        19       134        60
OIR    2025250     91400   17.7600 -113.3000       6.2        14       131        60
OIR    2025250     91400   17.7600 -113.3100       7.1        11       128        60
OIR    2025250     91400   17.7600 -113.3200       7.4        12       128        60
OIR    2025250     91400   17.7600 -113.3300       7.4        12       129        60
OIR    2025250     91400   17.7600 -113.3400       7.5        12       131        60
OIR    2025250     91400   17.7600 -113.3500       7.5        12       132        60
OIR    2025250     91400   17.7600 -113.3600       7.5        12       134        60
OIR    2025250     91400   17.7600 -113.3700       7.5        11       132        60
OIR    2025250     91400   17.7600 -113.3800       7.5        10       130        60
OIR    2025250     91400   17.7600 -113.3900       7.5         9       130        60
OIR    2025250     91400   17.7600 -113.4000       7.5         7       131        60
OIR    2025250     91400   17.7600 -113.4100       7.6         6       132        60
OIR    2025250     91400   17.7600 -113.4200       7.7         5       134        60
OIR    2025250     91400   17.7600 -113.4300       7.7         4       136        60
OIR    2025250     91400   17.7600 -113.4400       7.7         4       137        60
OIR    2025250     91400   17.7600 -113.4500       7.8         3       139        60
OIR    2025250     91400   17.7600 -113.4600       8.1         2       141        60
OIR    2025250     91400   17.7600 -113.4700       8.3         1       143        60
OIR    2025250     91400   17.7600 -113.4800       8.4         0       142        60
OIR    2025250     91400   17.7600 -113.4900       8.4       360       140        60
OIR    2025250     91400   17.7600 -113.5000       8.4       359       139        60
OIR    2025250     91400   17.7600 -113.5100       8.3       359       140        60
OIR    2025250     91400   17.7600 -113.5200       8.3       358       142        60
OIR    2025250     91400   17.7600 -113.5300       8.3       357       140        60
OIR    2025250     91400   17.7600 -113.5400       8.3       357       139        60
OIR    2025250     91400   17.7600 -113.5500       8.3       357       136        60
OIR    2025250     91400   17.7600 -113.5600       8.3       357       132        60
OIR    2025250     91400   17.7600 -113.5700       8.3       356       132        60
OIR    2025250     91400   17.7600 -113.5800       8.2       356       133        60
OIR    2025250     91400   17.7600 -113.5900       8.2       356       133        60
OIR    2025250     91400   17.7600 -113.6000       8.2       356       130        60
OIR    2025250     91400   17.7600 -113.6100       8.2       356       129        60
OIR    2025250     91400   17.7600 -113.6200       8.2       356       131        60
OIR    2025250     91400   17.7600 -113.6300       8.2       356       133        60
OIR    2025250     91400   17.7600 -113.6400       8.2       356       134        60
OIR    2025250     91400   17.7600 -113.6500       8.2       356       134        60
OIR    2025250     91400   17.7600 -113.6600       8.2       356       136        60
OIR    2025250     91400   17.7600 -113.6700       8.2       355       142        60
OIR    2025250     91400   17.7600 -113.7200       7.9       355       143        60
OIR    2025250     91400   17.7600 -113.7300       7.9       355       141        60
OIR    2025250     91400   17.7600 -113.7400       7.8       355       140        60
OIR    2025250     91400   17.7600 -113.7500       7.8       355       139        60
OIR    2025250     91400   17.7600 -113.7600       7.7       356       138        60
OIR    2025250     91400   17.7600 -113.7700       7.7       356       137        60
OIR    2025250     91400   17.7600 -113.7800       7.6       357       137        60
OIR    2025250     91400   17.7600 -113.7900       7.6       358       137        60
OIR    2025250     91400   17.7600 -113.8000       7.5       359       135        60
OIR    2025250     91400   17.7600 -113.8100       7.4         0       134        60
OIR    2025250     91400   17.7600 -113.8200       7.4         1       134        60
OIR    2025250     91400   17.7600 -113.8300       7.4         1       134        60
OIR    2025250     91400   17.7600 -113.8400       7.3         2       133        60
OIR    2025250     91400   17.7600 -113.8500       7.3         2       130        60
OIR    2025250     91400   17.7600 -113.8600       7.3         3       127        60
OIR    2025250     91400   17.7600 -113.8700       7.2         3       129        60
OIR    2025250     91400   17.7600 -113.8800       7.2         4       131        60
OIR    2025250     91400   17.7600 -113.8900       7.2         4       133        60
OIR    2025250     91400   17.7600 -113.9000       7.2         4       134        60
OIR    2025250     91400   17.7600 -113.9100       7.2         4       135        60
OIR    2025250     91400   17.7600 -113.9200       7.1         4       137        60
OIR    2025250     91400   17.7600 -113.9300       7.0         3       140        60
OIR    2025250     91400   17.7600 -113.9400       7.0         1       144        60
OIR    2025250     91400   17.7600 -113.9800       7.3         0       144        60
OIR    2025250     91400   17.7600 -113.9900       7.3         0       137        60
OIR    2025250     91400   17.7600 -114.0000       7.3         0       134        60
OIR    2025250     91400   17.7600 -114.0100       7.3         1       134        60
OIR    2025250     91400   17.7600 -114.0200       7.3         1       134        60
OIR    2025250     91400   17.7600 -114.0300       7.3         1       136        60
OIR    2025250     91400   17.7600 -114.0400       7.2         1       138        60
OIR    2025250     91400   17.7600 -114.0500       7.2         1       137        60
OIR    2025250     91400   17.7600 -114.0600       7.2         0       136        60
OIR    2025250     91400   17.7600 -114.0700       7.2       358       138        60
OIR    2025250     91400   17.7600 -114.0800       7.2       355       141        60
OIR    2025250     91400   17.7600 -114.0900       7.2       353       143        60
OIR    2025250     91400   17.7600 -114.1000       7.2       353       144        60
OIR    2025250     91400   17.7600 -114.1300       7.4       352       144        60
OIR    2025250     91400   17.7600 -114.1600       7.6       351       143        60
OIR    2025250     91400   17.7600 -114.1700       7.7       351       143        60
OIR    2025250     91400   17.7500 -110.4900      16.2        54       143        60
OIR    2025250     91400   17.7500 -110.6100      16.3        55       138        60
OIR    2025250     91400   17.7500 -110.6200      16.2        56       136        60
OIR    2025250     91400   17.7500 -110.6300      16.0        57       136        60
OIR    2025250     91400   17.7500 -110.6400      15.5        59       136        60
OIR    2025250     91400   17.7500 -110.6500      15.2        60       136        60
OIR    2025250     91400   17.7500 -110.6600      15.0        60       136        60
OIR    2025250     91400   17.7500 -110.6700      14.9        61       137        60
OIR    2025250     91400   17.7500 -110.6800      14.9        61       138        60
OIR    2025250     91400   17.7500 -110.6900      14.9        61       136        60
OIR    2025250     91400   17.7500 -110.7000      14.9        61       132        60
OIR    2025250     91400   17.7500 -110.7100      14.9        61       130        60
OIR    2025250     91400   17.7500 -110.7200      14.9        61       132        60
OIR    2025250     91400   17.7500 -110.7300      14.9        61       134        60
OIR    2025250     91400   17.7500 -110.7400      14.9        61       137        60
OIR    2025250     91400   17.7500 -110.7500      14.9        61       141        60
OIR    2025250     91400   17.7500 -110.7600      14.8        61       143        60
OIR    2025250     91400   17.7500 -111.3000      17.8        60       140        60
OIR    2025250     91400   17.7500 -111.3100      17.8        60       130        60
OIR    2025250     91400   17.7500 -111.3200      17.6        60       119        60
OIR    2025250     91400   17.7500 -111.3300      17.5        60       117        60
OIR    2025250     91400   17.7500 -111.3400      17.5        60       119        60
OIR    2025250     91400   17.7500 -111.3500      17.5        60       120        60
OIR    2025250     91400   17.7500 -111.3600      17.5        60       121        60
OIR    2025250     91400   17.7500 -111.3700      17.5        61       122        60
OIR    2025250     91400   17.7500 -111.3800      17.6        60       119        60
OIR    2025250     91400   17.7500 -111.3900      17.7        60       116        60
OIR    2025250     91400   17.7500 -111.4000      17.0        58       121        60
OIR    2025250     91400   17.7500 -111.4100      16.7        59       127        60
OIR    2025250     91400   17.7500 -111.4200      16.1        61       136        60
OIR    2025250     91400   17.7500 -111.6400      11.3        59       141        60
OIR    2025250     91400   17.7500 -111.6500      12.2        59       135        60
OIR    2025250     91400   17.7500 -111.6600      12.4        59       132        60
OIR    2025250     91400   17.7500 -111.6700      12.8        59       130        60
OIR    2025250     91400   17.7500 -111.6800      13.2        59       130        60
OIR    2025250     91400   17.7500 -111.6900      13.4        58       133        60
OIR    2025250     91400   17.7500 -111.7000      13.5        58       136        60
OIR    2025250     91400   17.7500 -111.7100      13.6        58       142        60
OIR    2025250     91400   17.7500 -111.7700      13.9        57       143        60
OIR    2025250     91400   17.7500 -111.7800      14.1        57       142        60
OIR    2025250     91400   17.7500 -111.7900      14.3        56       140        60
OIR    2025250     91400   17.7500 -111.8000      14.6        55       142        60
OIR    2025250     91400   17.7500 -111.8500      15.1        55       139        60
OIR    2025250     91400   17.7500 -111.8600      15.1        55       133        60
OIR    2025250     91400   17.7500 -111.8700      15.1        54       133        60
OIR    2025250     91400   17.7500 -111.8800      15.0        51       133        60
OIR    2025250     91400   17.7500 -111.8900      15.0        49       133        60
OIR    2025250     91400   17.7500 -111.9000      15.0        49       135        60
OIR    2025250     91400   17.7500 -111.9100      15.0        48       136        60
OIR    2025250     91400   17.7500 -111.9200      15.0        48       133        60
OIR    2025250     91400   17.7500 -111.9300      15.0        48       131        60
OIR    2025250     91400   17.7500 -111.9400      15.0        48       132        60
OIR    2025250     91400   17.7500 -111.9500      15.0        48       133        60
OIR    2025250     91400   17.7500 -111.9600      15.0        48       137        60
OIR    2025250     91400   17.7500 -111.9700      15.0        48       142        60
OIR    2025250     91400   17.7500 -112.0100      14.9        48       141        60
OIR    2025250     91400   17.7500 -112.0200      14.9        48       137        60
OIR    2025250     91400   17.7500 -112.0300      14.8        48       135        60
OIR    2025250     91400   17.7500 -112.0400      14.7        47       134        60
OIR    2025250     91400   17.7500 -112.0500      14.6        47       135        60
OIR    2025250     91400   17.7500 -112.0600      14.6        47       136        60
OIR    2025250     91400   17.7500 -112.0700      14.6        47       137        60
OIR    2025250     91400   17.7500 -112.0800      14.6        47       138        60
OIR    2025250     91400   17.7500 -112.0900      14.6        47       139        60
OIR    2025250     91400   17.7500 -112.1000      14.6        47       140        60
OIR    2025250     91400   17.7500 -112.1100      14.6        47       139        60
OIR    2025250     91400   17.7500 -112.1200      14.6        47       138        60
OIR    2025250     91400   17.7500 -112.1300      14.6        47       135        60
OIR    2025250     91400   17.7500 -112.1400      14.6        47       132        60
OIR    2025250     91400   17.7500 -112.1500      14.5        47       131        60
OIR    2025250     91400   17.7500 -112.1600      14.5        47       130        60
OIR    2025250     91400   17.7500 -112.1700      14.5        47       130        60
OIR    2025250     91400   17.7500 -112.1800      14.5        47       129        60
OIR    2025250     91400   17.7500 -112.1900      14.5        46       129        60
OIR    2025250     91400   17.7500 -112.2000      14.5        46       127        60
OIR    2025250     91400   17.7500 -112.2100      14.5        46       125        60
OIR    2025250     91400   17.7500 -112.2200      14.5        46       125        60
OIR    2025250     91400   17.7500 -112.2300      14.4        46       126        60
OIR    2025250     91400   17.7500 -112.2400      14.0        45       127        60
OIR    2025250     91400   17.7500 -112.2500      13.4        43       127        60
OIR    2025250     91400   17.7500 -112.2600      12.8        41       128        60
OIR    2025250     91400   17.7500 -112.2700      12.6        40       126        60
OIR    2025250     91400   17.7500 -112.2800      12.4        39       125        60
OIR    2025250     91400   17.7500 -112.2900      12.3        38       124        60
OIR    2025250     91400   17.7500 -112.3000      12.1        37       122        60
OIR    2025250     91400   17.7500 -112.3100      12.0        36       122        60
OIR    2025250     91400   17.7500 -112.3200      11.9        36       121        60
OIR    2025250     91400   17.7500 -112.3300      11.8        35       121        60
OIR    2025250     91400   17.7500 -112.3400      11.8        35       121        60
OIR    2025250     91400   17.7500 -112.3500      11.7        35       120        60
OIR    2025250     91400   17.7500 -112.3600      11.7        35       117        60
OIR    2025250     91400   17.7500 -112.3700      11.6        35       115        60
OIR    2025250     91400   17.7500 -112.3800      11.6        35       113        60
OIR    2025250     91400   17.7500 -112.3900      11.6        34       111        60
OIR    2025250     91400   17.7500 -112.4000      11.6        34       110        60
OIR    2025250     91400   17.7500 -112.4100      11.6        34       110        60
OIR    2025250     91400   17.7500 -112.4200      11.6        34       110        60
OIR    2025250     91400   17.7500 -112.4300      11.5        34       110        60
OIR    2025250     91400   17.7500 -112.4400      11.5        34       109        60
OIR    2025250     91400   17.7500 -112.4500      11.5        34       110        60
OIR    2025250     91400   17.7500 -112.4600      11.5        34       111        60
OIR    2025250     91400   17.7500 -112.4700      11.5        35       112        60
OIR    2025250     91400   17.7500 -112.4800      11.6        35       113        60
OIR    2025250     91400   17.7500 -112.4900      12.0        36       115        60
OIR    2025250     91400   17.7500 -112.5000      12.3        36       117        60
OIR    2025250     91400   17.7500 -112.5100      12.4        35       120        60
OIR    2025250     91400   17.7500 -112.5200      12.4        35       120        60
OIR    2025250     91400   17.7500 -112.5300      12.4        35       121        60
OIR    2025250     91400   17.7500 -112.5400      12.3        35       121        60
OIR    2025250     91400   17.7500 -112.5500      12.3        35       119        60
OIR    2025250     91400   17.7500 -112.5600      12.0        34       117        60
OIR    2025250     91400   17.7500 -112.5700      11.9        34       116        60
OIR    2025250     91400   17.7500 -112.5800      11.6        33       116        60
OIR    2025250     91400   17.7500 -112.5900      11.3        33       119        60
OIR    2025250     91400   17.7500 -112.6000      11.0        32       121        60
OIR    2025250     91400   17.7500 -112.6100      10.6        32       122        60
OIR    2025250     91400   17.7500 -112.6200      10.0        31       121        60
OIR    2025250     91400   17.7500 -112.6300       9.6        29       121        60
OIR    2025250     91400   17.7500 -112.6400       9.3        28       122        60
OIR    2025250     91400   17.7500 -112.6500       9.0        27       123        60
OIR    2025250     91400   17.7500 -112.6600       8.8        26       120        60
OIR    2025250     91400   17.7500 -112.6700       8.9        26       116        60
OIR    2025250     91400   17.7500 -112.6800       9.2        26       116        60
OIR    2025250     91400   17.7500 -112.6900       9.5        25       119        60
OIR    2025250     91400   17.7500 -112.7000       9.6        25       121        60
OIR    2025250     91400   17.7500 -112.7100       9.5        25       124        60
OIR    2025250     91400   17.7500 -112.7200       9.5        25       126        60
OIR    2025250     91400   17.7500 -112.7300       9.5        24       127        60
OIR    2025250     91400   17.7500 -112.7400       9.4        24       128        60
OIR    2025250     91400   17.7500 -112.7500       9.3        24       126        60
OIR    2025250     91400   17.7500 -112.7600       9.2        25       122        60
OIR    2025250     91400   17.7500 -112.7700       9.1        25       120        60
OIR    2025250     91400   17.7500 -112.7800       8.9        25       119        60
OIR    2025250     91400   17.7500 -112.7900       8.8        26       119        60
OIR    2025250     91400   17.7500 -112.8000       8.8        26       121        60
OIR    2025250     91400   17.7500 -112.8100       8.6        26       123        60
OIR    2025250     91400   17.7500 -112.8200       8.4        27       121        60
OIR    2025250     91400   17.7500 -112.8300       8.5        27       120        60
OIR    2025250     91400   17.7500 -112.8400       8.6        28       119        60
OIR    2025250     91400   17.7500 -112.8500       8.6        28       120        60
OIR    2025250     91400   17.7500 -112.8600       8.6        28       120        60
OIR    2025250     91400   17.7500 -112.8700       8.6        28       119        60
OIR    2025250     91400   17.7500 -112.8800       8.6        28       119        60
OIR    2025250     91400   17.7500 -112.8900       8.6        28       120        60
OIR    2025250     91400   17.7500 -112.9000       8.5        28       122        60
OIR    2025250     91400   17.7500 -112.9100       8.5        29       124        60
OIR    2025250     91400   17.7500 -112.9200       8.5        29       126        60
OIR    2025250     91400   17.7500 -112.9300       8.5        30       127        60
OIR    2025250     91400   17.7500 -112.9400       8.5        30       127        60
OIR    2025250     91400   17.7500 -112.9500       8.5        30       128        60
OIR    2025250     91400   17.7500 -112.9600       8.5        30       128        60
OIR    2025250     91400   17.7500 -112.9700       8.4        31       127        60
OIR    2025250     91400   17.7500 -112.9800       8.3        31       127        60
OIR    2025250     91400   17.7500 -112.9900       8.2        31       126        60
OIR    2025250     91400   17.7500 -113.0000       8.1        31       125        60
OIR    2025250     91400   17.7500 -113.0100       8.0        31       124        60
OIR    2025250     91400   17.7500 -113.0200       7.5        30       125        60
OIR    2025250     91400   17.7500 -113.0300       5.9        25       127        60
OIR    2025250     91400   17.7500 -113.0400       5.0        21       128        60
OIR    2025250     91400   17.7500 -113.0500       4.8        21       132        60
OIR    2025250     91400   17.7500 -113.0600       4.8        21       135        60
OIR    2025250     91400   17.7500 -113.0700       4.8        21       138        60
OIR    2025250     91400   17.7500 -113.0800       4.8        21       138        60
OIR    2025250     91400   17.7500 -113.0900       4.8        21       138        60
OIR    2025250     91400   17.7500 -113.1000       4.8        21       138        60
OIR    2025250     91400   17.7500 -113.1100       4.7        21       138        60
OIR    2025250     91400   17.7500 -113.1200       4.6        21       139        60
OIR    2025250     91400   17.7500 -113.1300       4.4        21       139        60
OIR    2025250     91400   17.7500 -113.1400       4.3        22       136        60
OIR    2025250     91400   17.7500 -113.1500       4.0        22       133        60
OIR    2025250     91400   17.7500 -113.2100       4.0        27       133        60
OIR    2025250     91400   17.7500 -113.2200       4.2        28       133        60
OIR    2025250     91400   17.7500 -113.2300       4.5        29       134        60
OIR    2025250     91400   17.7500 -113.2400       4.7        28       136        60
OIR    2025250     91400   17.7500 -113.2500       4.8        28       138        60
OIR    2025250     91400   17.7500 -113.2600       4.9        26       138        60
OIR    2025250     91400   17.7500 -113.2700       5.3        22       139        60
OIR    2025250     91400   17.7500 -113.2800       5.5        20       137        60
OIR    2025250     91400   17.7500 -113.2900       6.1        17       135        60
OIR    2025250     91400   17.7500 -113.3000       6.9        12       131        60
OIR    2025250     91400   17.7500 -113.3100       7.3        12       127        60
OIR    2025250     91400   17.7500 -113.3200       7.4        12       125        60
OIR    2025250     91400   17.7500 -113.3300       7.4        12       128        60
OIR    2025250     91400   17.7500 -113.3400       7.5        12       130        60
OIR    2025250     91400   17.7500 -113.3500       7.5        12       132        60
OIR    2025250     91400   17.7500 -113.3600       7.5        12       133        60
OIR    2025250     91400   17.7500 -113.3700       7.6        11       133        60
OIR    2025250     91400   17.7500 -113.3800       7.6        11       133        60
OIR    2025250     91400   17.7500 -113.3900       7.6        10       132        60
OIR    2025250     91400   17.7500 -113.4000       7.6         8       131        60
OIR    2025250     91400   17.7500 -113.4100       7.6         7       131        60
OIR    2025250     91400   17.7500 -113.4200       7.7         6       131        60
OIR    2025250     91400   17.7500 -113.4300       7.8         5       131        60
OIR    2025250     91400   17.7500 -113.4400       7.8         5       131        60
OIR    2025250     91400   17.7500 -113.4500       8.0         5       130        60
OIR    2025250     91400   17.7500 -113.4600       8.2         3       135        60
OIR    2025250     91400   17.7500 -113.4700       8.4         2       140        60
OIR    2025250     91400   17.7500 -113.4800       8.4         1       142        60
OIR    2025250     91400   17.7500 -113.4900       8.5         0       141        60
OIR    2025250     91400   17.7500 -113.5000       8.5       360       141        60
OIR    2025250     91400   17.7500 -113.5100       8.5       359       142        60
OIR    2025250     91400   17.7500 -113.5200       8.4       358       143        60
OIR    2025250     91400   17.7500 -113.5300       8.3       358       142        60
OIR    2025250     91400   17.7500 -113.5400       8.3       357       140        60
OIR    2025250     91400   17.7500 -113.5500       8.3       357       138        60
OIR    2025250     91400   17.7500 -113.5600       8.3       357       134        60
OIR    2025250     91400   17.7500 -113.5700       8.3       357       132        60
OIR    2025250     91400   17.7500 -113.5800       8.3       356       133        60
OIR    2025250     91400   17.7500 -113.5900       8.3       356       134        60
OIR    2025250     91400   17.7500 -113.6000       8.3       356       133        60
OIR    2025250     91400   17.7500 -113.6100       8.3       356       131        60
OIR    2025250     91400   17.7500 -113.6200       8.2       356       132        60
OIR    2025250     91400   17.7500 -113.6300       8.2       356       133        60
OIR    2025250     91400   17.7500 -113.6400       8.2       356       134        60
OIR    2025250     91400   17.7500 -113.6500       8.2       356       135        60
OIR    2025250     91400   17.7500 -113.6600       8.2       356       137        60
OIR    2025250     91400   17.7500 -113.6700       8.2       356       141        60
OIR    2025250     91400   17.7500 -113.7100       8.1       356       143        60
OIR    2025250     91400   17.7500 -113.7200       8.0       356       142        60
OIR    2025250     91400   17.7500 -113.7300       7.9       356       141        60
OIR    2025250     91400   17.7500 -113.7400       7.9       356       140        60
OIR    2025250     91400   17.7500 -113.7500       7.8       356       139        60
OIR    2025250     91400   17.7500 -113.7600       7.8       356       138        60
OIR    2025250     91400   17.7500 -113.7700       7.8       357       136        60
OIR    2025250     91400   17.7500 -113.7800       7.7       357       136        60
OIR    2025250     91400   17.7500 -113.7900       7.6       358       137        60
OIR    2025250     91400   17.7500 -113.8000       7.6       359       136        60
OIR    2025250     91400   17.7500 -113.8100       7.5       360       133        60
OIR    2025250     91400   17.7500 -113.8200       7.5         1       132        60
OIR    2025250     91400   17.7500 -113.8300       7.4         1       133        60
OIR    2025250     91400   17.7500 -113.8400       7.4         2       134        60
OIR    2025250     91400   17.7500 -113.8500       7.3         2       130        60
OIR    2025250     91400   17.7500 -113.8600       7.3         2       127        60
OIR    2025250     91400   17.7500 -113.8700       7.2         3       129        60
OIR    2025250     91400   17.7500 -113.8800       7.2         3       132        60
OIR    2025250     91400   17.7500 -113.8900       7.2         3       134        60
OIR    2025250     91400   17.7500 -113.9000       7.2         4       136        60
OIR    2025250     91400   17.7500 -113.9100       7.2         3       137        60
OIR    2025250     91400   17.7500 -113.9200       7.1         3       138        60
OIR    2025250     91400   17.7500 -113.9300       7.0         1       139        60
OIR    2025250     91400   17.7500 -113.9400       7.0         1       140        60
OIR    2025250     91400   17.7500 -113.9500       7.1         0       142        60
OIR    2025250     91400   17.7500 -113.9600       7.3         0       143        60
OIR    2025250     91400   17.7500 -113.9800       7.3         0       142        60
OIR    2025250     91400   17.7500 -113.9900       7.3         0       135        60
OIR    2025250     91400   17.7500 -114.0000       7.3         0       131        60
OIR    2025250     91400   17.7500 -114.0100       7.3         0       133        60
OIR    2025250     91400   17.7500 -114.0200       7.3         0       135        60
OIR    2025250     91400   17.7500 -114.0300       7.3         0       136        60
OIR    2025250     91400   17.7500 -114.0400       7.2         0       136        60
OIR    2025250     91400   17.7500 -114.0500       7.2       360       137        60
OIR    2025250     91400   17.7500 -114.0600       7.2       359       137        60
OIR    2025250     91400   17.7500 -114.0700       7.2       357       138        60
OIR    2025250     91400   17.7500 -114.0800       7.3       355       139        60
OIR    2025250     91400   17.7500 -114.0900       7.3       353       139        60
OIR    2025250     91400   17.7500 -114.1000       7.4       353       139        60
OIR    2025250     91400   17.7500 -114.1100       7.4       352       140        60
OIR    2025250     91400   17.7500 -114.1200       7.4       352       141        60
OIR    2025250     91400   17.7500 -114.1300       7.5       352       142        60
OIR    2025250     91400   17.7500 -114.1400       7.5       351       142        60
OIR    2025250     91400   17.7500 -114.1500       7.6       351       143        60
OIR    2025250     91400   17.7500 -114.1600       7.6       351       144        60
OIR    2025250     91400   17.7500 -114.1700       7.7       351       143        60
OIR    2025250     91400   17.7400 -110.6100      16.3        56       140        60
OIR    2025250     91400   17.7400 -110.6200      16.2        57       136        60
OIR    2025250     91400   17.7400 -110.6300      16.0        58       135        60
OIR    2025250     91400   17.7400 -110.6400      15.5        60       135        60
OIR    2025250     91400   17.7400 -110.6500      15.2        61       135        60
OIR    2025250     91400   17.7400 -110.6600      15.0        61       135        60
OIR    2025250     91400   17.7400 -110.6700      15.0        61       135        60
OIR    2025250     91400   17.7400 -110.6800      14.9        61       135        60
OIR    2025250     91400   17.7400 -110.6900      14.9        61       133        60
OIR    2025250     91400   17.7400 -110.7000      14.9        61       127        60
OIR    2025250     91400   17.7400 -110.7100      14.9        61       122        60
OIR    2025250     91400   17.7400 -110.7200      14.9        61       125        60
OIR    2025250     91400   17.7400 -110.7300      14.9        61       129        60
OIR    2025250     91400   17.7400 -110.7400      14.9        61       133        60
OIR    2025250     91400   17.7400 -110.7500      14.8        61       139        60
OIR    2025250     91400   17.7400 -110.7600      14.8        61       143        60
OIR    2025250     91400   17.7400 -111.3000      17.9        60       139        60
OIR    2025250     91400   17.7400 -111.3100      17.9        60       127        60
OIR    2025250     91400   17.7400 -111.3200      17.5        60       115        60
OIR    2025250     91400   17.7400 -111.3300      17.5        61       110        60
OIR    2025250     91400   17.7400 -111.3400      17.5        60       109        60
OIR    2025250     91400   17.7400 -111.3500      17.5        60       109        60
OIR    2025250     91400   17.7400 -111.3600      17.5        60       109        60
OIR    2025250     91400   17.7400 -111.3700      17.5        61       109        60
OIR    2025250     91400   17.7400 -111.3800      17.5        61       108        60
OIR    2025250     91400   17.7400 -111.3900      17.4        60       107        60
OIR    2025250     91400   17.7400 -111.4000      16.0        58       110        60
OIR    2025250     91400   17.7400 -111.4100      15.4        59       117        60
OIR    2025250     91400   17.7400 -111.4200      15.4        60       127        60
OIR    2025250     91400   17.7400 -111.4300      14.8        63       137        60
OIR    2025250     91400   17.7400 -111.6400      10.3        57       140        60
OIR    2025250     91400   17.7400 -111.6500      11.8        59       131        60
OIR    2025250     91400   17.7400 -111.6600      12.2        59       129        60
OIR    2025250     91400   17.7400 -111.6700      12.9        59       129        60
OIR    2025250     91400   17.7400 -111.6800      13.3        58       129        60
OIR    2025250     91400   17.7400 -111.6900      13.5        58       132        60
OIR    2025250     91400   17.7400 -111.7000      13.5        58       135        60
OIR    2025250     91400   17.7400 -111.7100      13.6        58       140        60
OIR    2025250     91400   17.7400 -111.7600      13.9        57       144        60
OIR    2025250     91400   17.7400 -111.7700      14.1        56       142        60
OIR    2025250     91400   17.7400 -111.7800      14.3        55       142        60
OIR    2025250     91400   17.7400 -111.7900      14.5        55       143        60
OIR    2025250     91400   17.7400 -111.8000      14.8        55       144        60
OIR    2025250     91400   17.7400 -111.8500      15.2        55       143        60
OIR    2025250     91400   17.7400 -111.8600      15.2        54       138        60
OIR    2025250     91400   17.7400 -111.8700      15.1        51       137        60
OIR    2025250     91400   17.7400 -111.8800      15.1        49       137        60
OIR    2025250     91400   17.7400 -111.8900      15.0        48       138        60
OIR    2025250     91400   17.7400 -111.9000      15.0        48       139        60
OIR    2025250     91400   17.7400 -111.9100      15.0        48       140        60
OIR    2025250     91400   17.7400 -111.9200      15.0        48       138        60
OIR    2025250     91400   17.7400 -111.9300      15.0        48       136        60
OIR    2025250     91400   17.7400 -111.9400      15.0        48       135        60
OIR    2025250     91400   17.7400 -111.9500      15.0        48       136        60
OIR    2025250     91400   17.7400 -111.9600      15.0        48       139        60
OIR    2025250     91400   17.7400 -111.9700      15.0        48       144        60
OIR    2025250     91400   17.7400 -112.0200      14.9        48       141        60
OIR    2025250     91400   17.7400 -112.0300      14.8        48       138        60
OIR    2025250     91400   17.7400 -112.0400      14.7        47       136        60
OIR    2025250     91400   17.7400 -112.0500      14.6        47       135        60
OIR    2025250     91400   17.7400 -112.0600      14.6        47       137        60
OIR    2025250     91400   17.7400 -112.0700      14.6        47       139        60
OIR    2025250     91400   17.7400 -112.0800      14.6        47       140        60
OIR    2025250     91400   17.7400 -112.0900      14.6        47       141        60
OIR    2025250     91400   17.7400 -112.1000      14.6        47       141        60
OIR    2025250     91400   17.7400 -112.1100      14.6        47       140        60
OIR    2025250     91400   17.7400 -112.1200      14.6        47       138        60
OIR    2025250     91400   17.7400 -112.1300      14.6        47       136        60
OIR    2025250     91400   17.7400 -112.1400      14.6        47       134        60
OIR    2025250     91400   17.7400 -112.1500      14.5        47       134        60
OIR    2025250     91400   17.7400 -112.1600      14.5        47       135        60
OIR    2025250     91400   17.7400 -112.1700      14.5        47       135        60
OIR    2025250     91400   17.7400 -112.1800      14.5        47       134        60
OIR    2025250     91400   17.7400 -112.1900      14.5        47       134        60
OIR    2025250     91400   17.7400 -112.2000      14.5        46       131        60
OIR    2025250     91400   17.7400 -112.2100      14.5        46       129        60
OIR    2025250     91400   17.7400 -112.2200      14.5        46       129        60
OIR    2025250     91400   17.7400 -112.2300      14.5        46       129        60
OIR    2025250     91400   17.7400 -112.2400      14.3        46       129        60
OIR    2025250     91400   17.7400 -112.2500      13.6        44       129        60
OIR    2025250     91400   17.7400 -112.2600      13.0        41       130        60
OIR    2025250     91400   17.7400 -112.2700      12.7        40       129        60
OIR    2025250     91400   17.7400 -112.2800      12.6        39       128        60
OIR    2025250     91400   17.7400 -112.2900      12.4        38       127        60
OIR    2025250     91400   17.7400 -112.3000      12.2        37       127        60
OIR    2025250     91400   17.7400 -112.3100      12.1        36       126        60
OIR    2025250     91400   17.7400 -112.3200      12.0        36       125        60
OIR    2025250     91400   17.7400 -112.3300      11.9        35       125        60
OIR    2025250     91400   17.7400 -112.3400      11.9        35       123        60
OIR    2025250     91400   17.7400 -112.3500      11.8        35       122        60
OIR    2025250     91400   17.7400 -112.3600      11.8        35       120        60
OIR    2025250     91400   17.7400 -112.3700      11.7        35       119        60
OIR    2025250     91400   17.7400 -112.3800      11.7        35       116        60
OIR    2025250     91400   17.7400 -112.3900      11.6        34       114        60
OIR    2025250     91400   17.7400 -112.4000      11.6        34       112        60
OIR    2025250     91400   17.7400 -112.4100      11.6        34       112        60
OIR    2025250     91400   17.7400 -112.4200      11.6        34       111        60
OIR    2025250     91400   17.7400 -112.4300      11.6        34       112        60
OIR    2025250     91400   17.7400 -112.4400      11.6        34       112        60
OIR    2025250     91400   17.7400 -112.4500      11.6        34       113        60
OIR    2025250     91400   17.7400 -112.4600      11.6        34       113        60
OIR    2025250     91400   17.7400 -112.4700      11.6        34       114        60
OIR    2025250     91400   17.7400 -112.4800      11.7        35       115        60
OIR    2025250     91400   17.7400 -112.4900      12.1        35       116        60
OIR    2025250     91400   17.7400 -112.5000      12.3        35       119        60
OIR    2025250     91400   17.7400 -112.5100      12.4        35       121        60
OIR    2025250     91400   17.7400 -112.5200      12.4        35       121        60
OIR    2025250     91400   17.7400 -112.5300      12.4        35       121        60
OIR    2025250     91400   17.7400 -112.5400      12.4        35       121        60
OIR    2025250     91400   17.7400 -112.5500      12.4        35       119        60
OIR    2025250     91400   17.7400 -112.5600      12.2        34       116        60
OIR    2025250     91400   17.7400 -112.5700      12.1        34       116        60
OIR    2025250     91400   17.7400 -112.5800      12.0        34       117        60
OIR    2025250     91400   17.7400 -112.5900      11.7        33       120        60
OIR    2025250     91400   17.7400 -112.6000      11.5        33       122        60
OIR    2025250     91400   17.7400 -112.6100      11.2        33       123        60
OIR    2025250     91400   17.7400 -112.6200      10.9        32       123        60
OIR    2025250     91400   17.7400 -112.6300      10.8        31       122        60
OIR    2025250     91400   17.7400 -112.6400      10.6        30       123        60
OIR    2025250     91400   17.7400 -112.6500      10.6        28       124        60
OIR    2025250     91400   17.7400 -112.6600      10.4        26       122        60
OIR    2025250     91400   17.7400 -112.6700      10.3        25       119        60
OIR    2025250     91400   17.7400 -112.6800      10.1        23       119        60
OIR    2025250     91400   17.7400 -112.6900       9.9        24       122        60
OIR    2025250     91400   17.7400 -112.7000       9.7        25       125        60
OIR    2025250     91400   17.7400 -112.7100       9.6        25       126        60
OIR    2025250     91400   17.7400 -112.7200       9.5        24       127        60
OIR    2025250     91400   17.7400 -112.7300       9.5        24       127        60
OIR    2025250     91400   17.7400 -112.7400       9.5        24       128        60
OIR    2025250     91400   17.7400 -112.7500       9.4        24       126        60
OIR    2025250     91400   17.7400 -112.7600       9.4        25       122        60
OIR    2025250     91400   17.7400 -112.7700       9.3        25       120        60
OIR    2025250     91400   17.7400 -112.7800       9.2        25       121        60
OIR    2025250     91400   17.7400 -112.7900       9.2        25       122        60
OIR    2025250     91400   17.7400 -112.8000       9.1        26       123        60
OIR    2025250     91400   17.7400 -112.8100       9.0        26       123        60
OIR    2025250     91400   17.7400 -112.8200       8.9        27       124        60
OIR    2025250     91400   17.7400 -112.8300       8.8        27       124        60
OIR    2025250     91400   17.7400 -112.8400       8.8        27       124        60
OIR    2025250     91400   17.7400 -112.8500       8.7        28       124        60
OIR    2025250     91400   17.7400 -112.8600       8.7        28       124        60
OIR    2025250     91400   17.7400 -112.8700       8.6        28       123        60
OIR    2025250     91400   17.7400 -112.8800       8.6        28       122        60
OIR    2025250     91400   17.7400 -112.8900       8.6        28       122        60
OIR    2025250     91400   17.7400 -112.9000       8.6        28       121        60
OIR    2025250     91400   17.7400 -112.9100       8.6        29       123        60
OIR    2025250     91400   17.7400 -112.9200       8.6        29       125        60
OIR    2025250     91400   17.7400 -112.9300       8.6        29       127        60
OIR    2025250     91400   17.7400 -112.9400       8.6        30       128        60
OIR    2025250     91400   17.7400 -112.9500       8.6        30       129        60
OIR    2025250     91400   17.7400 -112.9600       8.6        30       129        60
OIR    2025250     91400   17.7400 -112.9700       8.5        30       130        60
OIR    2025250     91400   17.7400 -112.9800       8.4        31       130        60
OIR    2025250     91400   17.7400 -112.9900       8.3        31       128        60
OIR    2025250     91400   17.7400 -113.0000       8.2        31       127        60
OIR    2025250     91400   17.7400 -113.0100       8.1        30       126        60
OIR    2025250     91400   17.7400 -113.0200       7.9        30       125        60
OIR    2025250     91400   17.7400 -113.0300       7.0        28       127        60
OIR    2025250     91400   17.7400 -113.0400       5.3        22       128        60
OIR    2025250     91400   17.7400 -113.0500       4.9        21       131        60
OIR    2025250     91400   17.7400 -113.0600       4.9        21       133        60
OIR    2025250     91400   17.7400 -113.0700       4.8        21       136        60
OIR    2025250     91400   17.7400 -113.0800       4.8        21       139        60
OIR    2025250     91400   17.7400 -113.0900       4.8        21       141        60
OIR    2025250     91400   17.7400 -113.1000       4.8        21       139        60
OIR    2025250     91400   17.7400 -113.1100       4.7        21       136        60
OIR    2025250     91400   17.7400 -113.1200       4.6        21       137        60
OIR    2025250     91400   17.7400 -113.1300       4.5        21       138        60
OIR    2025250     91400   17.7400 -113.1400       4.4        22       136        60
OIR    2025250     91400   17.7400 -113.1500       4.3        22       134        60
OIR    2025250     91400   17.7400 -113.1600       4.1        22       132        60
OIR    2025250     91400   17.7400 -113.2000       4.0        24       136        60
OIR    2025250     91400   17.7400 -113.2100       4.0        25       136        60
OIR    2025250     91400   17.7400 -113.2200       4.2        26       135        60
OIR    2025250     91400   17.7400 -113.2300       4.5        27       136        60
OIR    2025250     91400   17.7400 -113.2400       4.7        26       139        60
OIR    2025250     91400   17.7400 -113.2500       4.9        25       140        60
OIR    2025250     91400   17.7400 -113.2600       5.2        22       140        60
OIR    2025250     91400   17.7400 -113.2700       5.7        19       139        60
OIR    2025250     91400   17.7400 -113.2800       6.2        17       138        60
OIR    2025250     91400   17.7400 -113.2900       6.8        15       137        60
OIR    2025250     91400   17.7400 -113.3000       7.2        13       134        60
OIR    2025250     91400   17.7400 -113.3100       7.4        12       130        60
OIR    2025250     91400   17.7400 -113.3200       7.5        12       127        60
OIR    2025250     91400   17.7400 -113.3300       7.5        12       129        60
OIR    2025250     91400   17.7400 -113.3400       7.5        12       130        60
OIR    2025250     91400   17.7400 -113.3500       7.5        12       132        60
OIR    2025250     91400   17.7400 -113.3600       7.6        12       134        60
OIR    2025250     91400   17.7400 -113.3700       7.6        12       134        60
OIR    2025250     91400   17.7400 -113.3800       7.7        11       134        60
OIR    2025250     91400   17.7400 -113.3900       7.8        11       133        60
OIR    2025250     91400   17.7400 -113.4000       8.1        12       132        60
OIR    2025250     91400   17.7400 -113.4100       8.5        13       131        60
OIR    2025250     91400   17.7400 -113.4200       8.8        12       130        60
OIR    2025250     91400   17.7400 -113.4300       8.3         9       129        60
OIR    2025250     91400   17.7400 -113.4400       8.1         7       128        60
OIR    2025250     91400   17.7400 -113.4500       8.3         7       127        60
OIR    2025250     91400   17.7400 -113.4600       8.5         6       129        60
OIR    2025250     91400   17.7400 -113.4700       8.8         5       135        60
OIR    2025250     91400   17.7400 -113.4800       8.9         4       140        60
OIR    2025250     91400   17.7400 -113.4900       8.9         2       142        60
OIR    2025250     91400   17.7400 -113.5000       8.8         1       143        60
OIR    2025250     91400   17.7400 -113.5100       8.7         0       143        60
OIR    2025250     91400   17.7400 -113.5200       8.6       359       144        60
OIR    2025250     91400   17.7400 -113.5300       8.5       358       143        60
OIR    2025250     91400   17.7400 -113.5400       8.4       358       142        60
OIR    2025250     91400   17.7400 -113.5500       8.4       357       140        60
OIR    2025250     91400   17.7400 -113.5600       8.3       357       136        60
OIR    2025250     91400   17.7400 -113.5700       8.3       357       132        60
OIR    2025250     91400   17.7400 -113.5800       8.3       357       133        60
OIR    2025250     91400   17.7400 -113.5900       8.3       357       134        60
OIR    2025250     91400   17.7400 -113.6000       8.3       356       135        60
OIR    2025250     91400   17.7400 -113.6100       8.3       356       134        60
OIR    2025250     91400   17.7400 -113.6200       8.3       356       134        60
OIR    2025250     91400   17.7400 -113.6300       8.2       356       134        60
OIR    2025250     91400   17.7400 -113.6400       8.2       356       135        60
OIR    2025250     91400   17.7400 -113.6500       8.2       356       137        60
OIR    2025250     91400   17.7400 -113.6600       8.2       356       139        60
OIR    2025250     91400   17.7400 -113.6700       8.2       356       142        60
OIR    2025250     91400   17.7400 -113.6900       8.1       356       143        60
OIR    2025250     91400   17.7400 -113.7000       8.1       356       139        60
OIR    2025250     91400   17.7400 -113.7100       8.1       356       137        60
OIR    2025250     91400   17.7400 -113.7200       8.1       356       136        60
OIR    2025250     91400   17.7400 -113.7300       8.0       356       137        60
OIR    2025250     91400   17.7400 -113.7400       8.0       356       139        60
OIR    2025250     91400   17.7400 -113.7500       7.9       357       142        60
OIR    2025250     91400   17.7400 -113.7600       7.9       357       140        60
OIR    2025250     91400   17.7400 -113.7700       7.8       357       139        60
OIR    2025250     91400   17.7400 -113.7800       7.8       358       139        60
OIR    2025250     91400   17.7400 -113.7900       7.7       358       140        60
OIR    2025250     91400   17.7400 -113.8000       7.7       359       138        60
OIR    2025250     91400   17.7400 -113.8100       7.6       359       135        60
OIR    2025250     91400   17.7400 -113.8200       7.5         0       131        60
OIR    2025250     91400   17.7400 -113.8300       7.5         1       132        60
OIR    2025250     91400   17.7400 -113.8400       7.4         1       133        60
OIR    2025250     91400   17.7400 -113.8500       7.4         2       133        60
OIR    2025250     91400   17.7400 -113.8600       7.3         2       134        60
OIR    2025250     91400   17.7400 -113.8700       7.3         2       133        60
OIR    2025250     91400   17.7400 -113.8800       7.3         3       132        60
OIR    2025250     91400   17.7400 -113.8900       7.3         3       133        60
OIR    2025250     91400   17.7400 -113.9000       7.3         3       136        60
OIR    2025250     91400   17.7400 -113.9100       7.3         2       138        60
OIR    2025250     91400   17.7400 -113.9200       7.2         2       137        60
OIR    2025250     91400   17.7400 -113.9300       7.1         1       137        60
OIR    2025250     91400   17.7400 -113.9400       7.1         1       139        60
OIR    2025250     91400   17.7400 -113.9500       7.2         0       141        60
OIR    2025250     91400   17.7400 -113.9600       7.3       360       141        60
OIR    2025250     91400   17.7400 -113.9700       7.3       360       141        60
OIR    2025250     91400   17.7400 -113.9800       7.3       360       140        60
OIR    2025250     91400   17.7400 -113.9900       7.3       360       137        60
OIR    2025250     91400   17.7400 -114.0000       7.3       360       134        60
OIR    2025250     91400   17.7400 -114.0100       7.3       360       135        60
OIR    2025250     91400   17.7400 -114.0200       7.3       360       136        60
OIR    2025250     91400   17.7400 -114.0300       7.3       360       135        60
OIR    2025250     91400   17.7400 -114.0400       7.3       359       135        60
OIR    2025250     91400   17.7400 -114.0500       7.3       359       136        60
OIR    2025250     91400   17.7400 -114.0600       7.3       358       137        60
OIR    2025250     91400   17.7400 -114.0700       7.3       356       137        60
OIR    2025250     91400   17.7400 -114.0800       7.4       354       138        60
OIR    2025250     91400   17.7400 -114.0900       7.4       353       138        60
OIR    2025250     91400   17.7400 -114.1000       7.4       352       138        60
OIR    2025250     91400   17.7400 -114.1100       7.5       352       137        60
OIR    2025250     91400   17.7400 -114.1200       7.5       352       138        60
OIR    2025250     91400   17.7400 -114.1300       7.5       352       138        60
OIR    2025250     91400   17.7400 -114.1400       7.6       351       140        60
OIR    2025250     91400   17.7400 -114.1500       7.6       351       141        60
OIR    2025250     91400   17.7400 -114.1600       7.7       351       142        60
OIR    2025250     91400   17.7400 -114.1700       7.7       351       142        60
OIR    2025250     91400   17.7400 -114.1800       7.7       351       142        60
OIR    2025250     91400   17.7300 -110.6100      16.4        58       142        60
OIR    2025250     91400   17.7300 -110.6200      16.3        59       136        60
OIR    2025250     91400   17.7300 -110.6300      16.0        59       133        60
OIR    2025250     91400   17.7300 -110.6400      15.5        60       130        60
OIR    2025250     91400   17.7300 -110.6500      15.2        61       132        60
OIR    2025250     91400   17.7300 -110.6600      15.1        61       133        60
OIR    2025250     91400   17.7300 -110.6700      15.0        61       133        60
OIR    2025250     91400   17.7300 -110.6800      15.0        61       131        60
OIR    2025250     91400   17.7300 -110.6900      14.9        62       129        60
OIR    2025250     91400   17.7300 -110.7000      14.9        62       125        60
OIR    2025250     91400   17.7300 -110.7100      14.9        61       122        60
OIR    2025250     91400   17.7300 -110.7200      14.9        62       123        60
OIR    2025250     91400   17.7300 -110.7300      14.9        61       126        60
OIR    2025250     91400   17.7300 -110.7400      14.9        61       129        60
OIR    2025250     91400   17.7300 -110.7500      14.8        61       135        60
OIR    2025250     91400   17.7300 -110.7600      14.8        61       141        60
OIR    2025250     91400   17.7300 -110.7700      14.8        62       144        60
OIR    2025250     91400   17.7300 -111.3000      18.2        60       137        60
OIR    2025250     91400   17.7300 -111.3100      18.3        60       127        60
OIR    2025250     91400   17.7300 -111.3200      17.6        61       114        60
OIR    2025250     91400   17.7300 -111.3300      17.5        61       105        60
OIR    2025250     91400   17.7300 -111.3400      17.5        61       104        60
OIR    2025250     91400   17.7300 -111.3500      17.5        60       104        60
OIR    2025250     91400   17.7300 -111.3600      17.5        60       104        60
OIR    2025250     91400   17.7300 -111.3700      17.5        60       104        60
OIR    2025250     91400   17.7300 -111.3800      17.3        60       104        60
OIR    2025250     91400   17.7300 -111.3900      16.8        60       104        60
OIR    2025250     91400   17.7300 -111.4000      15.6        58       104        60
OIR    2025250     91400   17.7300 -111.4100      15.4        59       109        60
OIR    2025250     91400   17.7300 -111.4200      15.3        59       113        60
OIR    2025250     91400   17.7300 -111.4300      14.9        59       119        60
OIR    2025250     91400   17.7300 -111.4400      15.1        57       125        60
OIR    2025250     91400   17.7300 -111.4500      15.6        55       130        60
OIR    2025250     91400   17.7300 -111.4600      15.6        55       132        60
OIR    2025250     91400   17.7300 -111.4700      15.3        56       136        60
OIR    2025250     91400   17.7300 -111.6400       9.4        57       141        60
OIR    2025250     91400   17.7300 -111.6500      11.2        58       132        60
OIR    2025250     91400   17.7300 -111.6600      11.9        58       129        60
OIR    2025250     91400   17.7300 -111.6700      13.0        58       130        60
OIR    2025250     91400   17.7300 -111.6800      13.3        58       131        60
OIR    2025250     91400   17.7300 -111.6900      13.4        58       132        60
OIR    2025250     91400   17.7300 -111.7000      13.5        58       134        60
OIR    2025250     91400   17.7300 -111.7100      13.6        58       138        60
OIR    2025250     91400   17.7300 -111.7200      13.7        58       142        60
OIR    2025250     91400   17.7300 -111.7600      14.1        56       144        60
OIR    2025250     91400   17.7300 -111.7700      14.3        55       142        60
OIR    2025250     91400   17.7300 -111.7800      14.5        54       142        60
OIR    2025250     91400   17.7300 -111.8200      15.3        53       144        60
OIR    2025250     91400   17.7300 -111.8600      15.1        51       143        60
OIR    2025250     91400   17.7300 -111.8700      15.1        49       142        60
OIR    2025250     91400   17.7300 -111.8800      15.0        48       142        60
OIR    2025250     91400   17.7300 -111.8900      15.0        48       143        60
OIR    2025250     91400   17.7300 -111.9000      15.0        48       144        60
OIR    2025250     91400   17.7300 -111.9100      15.0        48       144        60
OIR    2025250     91400   17.7300 -111.9200      15.0        48       143        60
OIR    2025250     91400   17.7300 -111.9300      15.0        48       142        60
OIR    2025250     91400   17.7300 -111.9400      15.0        48       140        60
OIR    2025250     91400   17.7300 -111.9500      15.0        48       140        60
OIR    2025250     91400   17.7300 -111.9600      15.0        48       140        60
OIR    2025250     91400   17.7300 -112.0200      14.9        47       143        60
OIR    2025250     91400   17.7300 -112.0300      14.8        47       140        60
OIR    2025250     91400   17.7300 -112.0400      14.7        47       137        60
OIR    2025250     91400   17.7300 -112.0500      14.6        47       135        60
OIR    2025250     91400   17.7300 -112.0600      14.6        47       136        60
OIR    2025250     91400   17.7300 -112.0700      14.6        47       139        60
OIR    2025250     91400   17.7300 -112.0800      14.6        47       140        60
OIR    2025250     91400   17.7300 -112.0900      14.6        47       140        60
OIR    2025250     91400   17.7300 -112.1000      14.6        47       141        60
OIR    2025250     91400   17.7300 -112.1100      14.6        47       139        60
OIR    2025250     91400   17.7300 -112.1200      14.6        47       137        60
OIR    2025250     91400   17.7300 -112.1300      14.6        47       136        60
OIR    2025250     91400   17.7300 -112.1400      14.6        47       136        60
OIR    2025250     91400   17.7300 -112.1500      14.6        47       137        60
OIR    2025250     91400   17.7300 -112.1600      14.5        47       138        60
OIR    2025250     91400   17.7300 -112.1700      14.5        47       139        60
OIR    2025250     91400   17.7300 -112.1800      14.5        47       138        60
OIR    2025250     91400   17.7300 -112.1900      14.6        47       137        60
OIR    2025250     91400   17.7300 -112.2000      14.6        47       134        60
OIR    2025250     91400   17.7300 -112.2100      14.6        47       132        60
OIR    2025250     91400   17.7300 -112.2200      14.6        46       130        60
OIR    2025250     91400   17.7300 -112.2300      14.6        46       131        60
OIR    2025250     91400   17.7300 -112.2400      14.5        46       130        60
OIR    2025250     91400   17.7300 -112.2500      13.8        44       130        60
OIR    2025250     91400   17.7300 -112.2600      13.2        41       130        60
OIR    2025250     91400   17.7300 -112.2700      12.9        40       129        60
OIR    2025250     91400   17.7300 -112.2800      12.7        39       127        60
OIR    2025250     91400   17.7300 -112.2900      12.6        38       127        60
OIR    2025250     91400   17.7300 -112.3000      12.4        37       127        60
OIR    2025250     91400   17.7300 -112.3100      12.2        36       128        60
OIR    2025250     91400   17.7300 -112.3200      12.1        36       127        60
OIR    2025250     91400   17.7300 -112.3300      12.0        35       127        60
OIR    2025250     91400   17.7300 -112.3400      12.0        35       125        60
OIR    2025250     91400   17.7300 -112.3500      11.9        35       123        60
OIR    2025250     91400   17.7300 -112.3600      11.8        35       122        60
OIR    2025250     91400   17.7300 -112.3700      11.8        35       122        60
OIR    2025250     91400   17.7300 -112.3800      11.7        34       120        60
OIR    2025250     91400   17.7300 -112.3900      11.6        34       116        60
OIR    2025250     91400   17.7300 -112.4000      11.6        34       115        60
OIR    2025250     91400   17.7300 -112.4100      11.6        34       113        60
OIR    2025250     91400   17.7300 -112.4200      11.6        34       112        60
OIR    2025250     91400   17.7300 -112.4300      11.6        34       113        60
OIR    2025250     91400   17.7300 -112.4400      11.6        34       115        60
OIR    2025250     91400   17.7300 -112.4500      11.6        34       115        60
OIR    2025250     91400   17.7300 -112.4600      11.6        34       116        60
OIR    2025250     91400   17.7300 -112.4700      11.6        34       116        60
OIR    2025250     91400   17.7300 -112.4800      11.7        34       116        60
OIR    2025250     91400   17.7300 -112.4900      12.1        35       117        60
OIR    2025250     91400   17.7300 -112.5000      12.3        35       120        60
OIR    2025250     91400   17.7300 -112.5100      12.4        35       122        60
OIR    2025250     91400   17.7300 -112.5200      12.4        35       122        60
OIR    2025250     91400   17.7300 -112.5300      12.4        35       121        60
OIR    2025250     91400   17.7300 -112.5400      12.4        35       120        60
OIR    2025250     91400   17.7300 -112.5500      12.4        35       117        60
OIR    2025250     91400   17.7300 -112.5600      12.3        35       116        60
OIR    2025250     91400   17.7300 -112.5700      12.3        35       116        60
OIR    2025250     91400   17.7300 -112.5800      12.2        34       119        60
OIR    2025250     91400   17.7300 -112.5900      12.0        34       121        60
OIR    2025250     91400   17.7300 -112.6000      11.7        34       123        60
OIR    2025250     91400   17.7300 -112.6100      11.5        33       125        60
OIR    2025250     91400   17.7300 -112.6200      11.3        32       124        60
OIR    2025250     91400   17.7300 -112.6300      11.1        31       123        60
OIR    2025250     91400   17.7300 -112.6400      11.2        30       124        60
OIR    2025250     91400   17.7300 -112.6500      11.3        28       125        60
OIR    2025250     91400   17.7300 -112.6600      11.3        26       124        60
OIR    2025250     91400   17.7300 -112.6700      11.1        25       122        60
OIR    2025250     91400   17.7300 -112.6800      10.8        23       121        60
OIR    2025250     91400   17.7300 -112.6900      10.6        23       125        60
OIR    2025250     91400   17.7300 -112.7000      10.1        24       128        60
OIR    2025250     91400   17.7300 -112.7100       9.7        24       129        60
OIR    2025250     91400   17.7300 -112.7200       9.6        24       129        60
OIR    2025250     91400   17.7300 -112.7300       9.5        24       129        60
OIR    2025250     91400   17.7300 -112.7400       9.5        24       128        60
OIR    2025250     91400   17.7300 -112.7500       9.4        24       127        60
OIR    2025250     91400   17.7300 -112.7600       9.4        25       125        60
OIR    2025250     91400   17.7300 -112.7700       9.4        25       123        60
OIR    2025250     91400   17.7300 -112.7800       9.3        25       123        60
OIR    2025250     91400   17.7300 -112.7900       9.2        25       124        60
OIR    2025250     91400   17.7300 -112.8000       9.2        26       125        60
OIR    2025250     91400   17.7300 -112.8100       9.1        26       126        60
OIR    2025250     91400   17.7300 -112.8200       9.0        27       127        60
OIR    2025250     91400   17.7300 -112.8300       9.0        27       127        60
OIR    2025250     91400   17.7300 -112.8400       8.9        27       127        60
OIR    2025250     91400   17.7300 -112.8500       8.8        27       127        60
OIR    2025250     91400   17.7300 -112.8600       8.7        28       127        60
OIR    2025250     91400   17.7300 -112.8700       8.6        28       125        60
OIR    2025250     91400   17.7300 -112.8800       8.6        28       124        60
OIR    2025250     91400   17.7300 -112.8900       8.6        28       123        60
OIR    2025250     91400   17.7300 -112.9000       8.6        28       122        60
OIR    2025250     91400   17.7300 -112.9100       8.6        29       122        60
OIR    2025250     91400   17.7300 -112.9200       8.6        29       125        60
OIR    2025250     91400   17.7300 -112.9300       8.6        29       128        60
OIR    2025250     91400   17.7300 -112.9400       8.6        29       129        60
OIR    2025250     91400   17.7300 -112.9500       8.6        30       130        60
OIR    2025250     91400   17.7300 -112.9600       8.6        30       130        60
OIR    2025250     91400   17.7300 -112.9700       8.6        30       130        60
OIR    2025250     91400   17.7300 -112.9800       8.5        30       130        60
OIR    2025250     91400   17.7300 -112.9900       8.4        30       129        60
OIR    2025250     91400   17.7300 -113.0000       8.3        30       127        60
OIR    2025250     91400   17.7300 -113.0100       8.3        30       127        60
OIR    2025250     91400   17.7300 -113.0200       8.1        29       126        60
OIR    2025250     91400   17.7300 -113.0300       7.7        27       127        60
OIR    2025250     91400   17.7300 -113.0400       6.1        23       128        60
OIR    2025250     91400   17.7300 -113.0500       5.3        22       130        60
OIR    2025250     91400   17.7300 -113.0600       5.0        21       132        60
OIR    2025250     91400   17.7300 -113.0700       4.9        21       134        60
OIR    2025250     91400   17.7300 -113.0800       4.8        21       138        60
OIR    2025250     91400   17.7300 -113.0900       4.8        21       142        60
OIR    2025250     91400   17.7300 -113.1000       4.8        21       139        60
OIR    2025250     91400   17.7300 -113.1100       4.8        21       135        60
OIR    2025250     91400   17.7300 -113.1200       4.6        21       135        60
OIR    2025250     91400   17.7300 -113.1300       4.5        22       136        60
OIR    2025250     91400   17.7300 -113.1400       4.4        22       136        60
OIR    2025250     91400   17.7300 -113.1500       4.3        22       135        60
OIR    2025250     91400   17.7300 -113.1600       4.2        22       134        60
OIR    2025250     91400   17.7300 -113.1700       4.0        22       134        60
OIR    2025250     91400   17.7300 -113.1800       4.0        22       135        60
OIR    2025250     91400   17.7300 -113.1900       4.0        22       136        60
OIR    2025250     91400   17.7300 -113.2000       4.0        23       138        60
OIR    2025250     91400   17.7300 -113.2100       4.1        23       139        60
OIR    2025250     91400   17.7300 -113.2200       4.2        24       138        60
OIR    2025250     91400   17.7300 -113.2300       4.5        25       138        60
OIR    2025250     91400   17.7300 -113.2400       4.8        25       141        60
OIR    2025250     91400   17.7300 -113.2500       5.1        23       144        60
OIR    2025250     91400   17.7300 -113.2600       5.5        19       142        60
OIR    2025250     91400   17.7300 -113.2700       6.0        17       139        60
OIR    2025250     91400   17.7300 -113.2800       6.5        16       138        60
OIR    2025250     91400   17.7300 -113.2900       7.1        14       139        60
OIR    2025250     91400   17.7300 -113.3000       7.4        13       137        60
OIR    2025250     91400   17.7300 -113.3100       7.4        13       135        60
OIR    2025250     91400   17.7300 -113.3200       7.5        12       132        60
OIR    2025250     91400   17.7300 -113.3300       7.5        12       132        60
OIR    2025250     91400   17.7300 -113.3400       7.5        12       132        60
OIR    2025250     91400   17.7300 -113.3500       7.5        13       133        60
OIR    2025250     91400   17.7300 -113.3600       7.6        13       135        60
OIR    2025250     91400   17.7300 -113.3700       7.7        13       135        60
OIR    2025250     91400   17.7300 -113.3800       7.8        12       134        60
OIR    2025250     91400   17.7300 -113.3900       8.0        13       134        60
OIR    2025250     91400   17.7300 -113.4000       8.8        15       132        60
OIR    2025250     91400   17.7300 -113.4100       9.8        17       132        60
OIR    2025250     91400   17.7300 -113.4200      10.1        17       131        60
OIR    2025250     91400   17.7300 -113.4300       9.5        16       130        60
OIR    2025250     91400   17.7300 -113.4400       8.7        12       130        60
OIR    2025250     91400   17.7300 -113.4500       8.7        11       130        60
OIR    2025250     91400   17.7300 -113.4600       9.2        12       130        60
OIR    2025250     91400   17.7300 -113.4700      10.2        12       132        60
OIR    2025250     91400   17.7300 -113.4800      10.5        12       135        60
OIR    2025250     91400   17.7300 -113.4900      10.4        10       136        60
OIR    2025250     91400   17.7300 -113.5000      10.0         8       137        60
OIR    2025250     91400   17.7300 -113.5100       9.5         6       140        60
OIR    2025250     91400   17.7300 -113.5200       9.0         3       142        60
OIR    2025250     91400   17.7300 -113.5300       8.7         0       142        60
OIR    2025250     91400   17.7300 -113.5400       8.5       359       142        60
OIR    2025250     91400   17.7300 -113.5500       8.4       358       140        60
OIR    2025250     91400   17.7300 -113.5600       8.4       357       137        60
OIR    2025250     91400   17.7300 -113.5700       8.4       357       133        60
OIR    2025250     91400   17.7300 -113.5800       8.4       357       133        60
OIR    2025250     91400   17.7300 -113.5900       8.4       357       133        60
OIR    2025250     91400   17.7300 -113.6000       8.3       356       133        60
OIR    2025250     91400   17.7300 -113.6100       8.3       356       133        60
OIR    2025250     91400   17.7300 -113.6200       8.3       356       133        60
OIR    2025250     91400   17.7300 -113.6300       8.3       356       134        60
OIR    2025250     91400   17.7300 -113.6400       8.2       356       134        60
OIR    2025250     91400   17.7300 -113.6500       8.2       356       136        60
OIR    2025250     91400   17.7300 -113.6600       8.2       356       137        60
OIR    2025250     91400   17.7300 -113.6700       8.2       356       138        60
OIR    2025250     91400   17.7300 -113.6800       8.1       356       140        60
OIR    2025250     91400   17.7300 -113.6900       8.1       356       140        60
OIR    2025250     91400   17.7300 -113.7000       8.1       356       139        60
OIR    2025250     91400   17.7300 -113.7100       8.1       356       138        60
OIR    2025250     91400   17.7300 -113.7200       8.1       356       138        60
OIR    2025250     91400   17.7300 -113.7300       8.1       357       138        60
OIR    2025250     91400   17.7300 -113.7400       8.0       357       140        60
OIR    2025250     91400   17.7300 -113.7500       8.0       357       142        60
OIR    2025250     91400   17.7300 -113.7600       7.9       357       142        60
OIR    2025250     91400   17.7300 -113.7700       7.9       358       141        60
OIR    2025250     91400   17.7300 -113.7800       7.8       358       141        60
OIR    2025250     91400   17.7300 -113.7900       7.8       358       142        60
OIR    2025250     91400   17.7300 -113.8000       7.7       359       140        60
OIR    2025250     91400   17.7300 -113.8100       7.7       359       137        60
OIR    2025250     91400   17.7300 -113.8200       7.6         0       133        60
OIR    2025250     91400   17.7300 -113.8300       7.5         1       133        60
OIR    2025250     91400   17.7300 -113.8400       7.5         1       133        60
OIR    2025250     91400   17.7300 -113.8500       7.4         1       134        60
OIR    2025250     91400   17.7300 -113.8600       7.4         2       137        60
OIR    2025250     91400   17.7300 -113.8700       7.3         2       138        60
OIR    2025250     91400   17.7300 -113.8800       7.3         2       135        60
OIR    2025250     91400   17.7300 -113.8900       7.4         2       133        60
OIR    2025250     91400   17.7300 -113.9000       7.4         2       136        60
OIR    2025250     91400   17.7300 -113.9100       7.4         2       139        60
OIR    2025250     91400   17.7300 -113.9200       7.4         1       137        60
OIR    2025250     91400   17.7300 -113.9300       7.3         1       136        60
OIR    2025250     91400   17.7300 -113.9400       7.3         0       138        60
OIR    2025250     91400   17.7300 -113.9500       7.3       360       140        60
OIR    2025250     91400   17.7300 -113.9600       7.3       360       140        60
OIR    2025250     91400   17.7300 -113.9700       7.3       360       139        60
OIR    2025250     91400   17.7300 -113.9800       7.3       360       137        60
OIR    2025250     91400   17.7300 -113.9900       7.3       360       138        60
OIR    2025250     91400   17.7300 -114.0000       7.3       360       137        60
OIR    2025250     91400   17.7300 -114.0100       7.3       360       137        60
OIR    2025250     91400   17.7300 -114.0200       7.3       359       136        60
OIR    2025250     91400   17.7300 -114.0300       7.3       359       136        60
OIR    2025250     91400   17.7300 -114.0400       7.3       359       135        60
OIR    2025250     91400   17.7300 -114.0500       7.3       358       135        60
OIR    2025250     91400   17.7300 -114.0600       7.3       357       136        60
OIR    2025250     91400   17.7300 -114.0700       7.3       355       137        60
OIR    2025250     91400   17.7300 -114.0800       7.4       354       138        60
OIR    2025250     91400   17.7300 -114.0900       7.5       353       138        60
OIR    2025250     91400   17.7300 -114.1000       7.5       352       137        60
OIR    2025250     91400   17.7300 -114.1100       7.5       352       137        60
OIR    2025250     91400   17.7300 -114.1200       7.6       352       136        60
OIR    2025250     91400   17.7300 -114.1300       7.6       352       135        60
OIR    2025250     91400   17.7300 -114.1400       7.6       352       135        60
OIR    2025250     91400   17.7300 -114.1500       7.6       351       135        60
OIR    2025250     91400   17.7300 -114.1600       7.7       351       136        60
OIR    2025250     91400   17.7300 -114.1700       7.7       351       137        60
OIR    2025250     91400   17.7300 -114.1800       7.7       351       137        60
OIR    2025250     91400   17.7300 -114.1900       7.7       351       143        60
OIR    2025250     91400   17.7200 -110.6100      16.3        59       141        60
OIR    2025250     91400   17.7200 -110.6200      16.3        59       135        60
OIR    2025250     91400   17.7200 -110.6300      16.1        60       132        60
OIR    2025250     91400   17.7200 -110.6400      15.5        61       129        60
OIR    2025250     91400   17.7200 -110.6500      15.2        61       129        60
OIR    2025250     91400   17.7200 -110.6600      15.1        61       131        60
OIR    2025250     91400   17.7200 -110.6700      15.0        61       132        60
OIR    2025250     91400   17.7200 -110.6800      15.0        62       129        60
OIR    2025250     91400   17.7200 -110.6900      14.9        62       125        60
OIR    2025250     91400   17.7200 -110.7000      14.9        62       123        60
OIR    2025250     91400   17.7200 -110.7100      14.9        62       121        60
OIR    2025250     91400   17.7200 -110.7200      14.9        62       122        60
OIR    2025250     91400   17.7200 -110.7300      14.9        62       125        60
OIR    2025250     91400   17.7200 -110.7400      14.8        62       127        60
OIR    2025250     91400   17.7200 -110.7500      14.8        62       132        60
OIR    2025250     91400   17.7200 -110.7600      14.8        62       137        60
OIR    2025250     91400   17.7200 -110.7700      14.7        62       141        60
OIR    2025250     91400   17.7200 -111.2900      18.1        59       141        60
OIR    2025250     91400   17.7200 -111.3000      18.8        59       132        60
OIR    2025250     91400   17.7200 -111.3100      19.2        59       123        60
OIR    2025250     91400   17.7200 -111.3200      19.4        60       113        60
OIR    2025250     91400   17.7200 -111.3300      18.6        60       103        60
OIR    2025250     91400   17.7200 -111.3400      17.7        61       103        60
OIR    2025250     91400   17.7200 -111.3500      17.5        60       103        60
OIR    2025250     91400   17.7200 -111.3600      17.5        60       103        60
OIR    2025250     91400   17.7200 -111.3700      17.5        60       103        60
OIR    2025250     91400   17.7200 -111.3800      17.0        59       103        60
OIR    2025250     91400   17.7200 -111.3900      16.2        58       103        60
OIR    2025250     91400   17.7200 -111.4000      15.5        58       103        60
OIR    2025250     91400   17.7200 -111.4100      15.4        58       103        60
OIR    2025250     91400   17.7200 -111.4200      15.3        58       103        60
OIR    2025250     91400   17.7200 -111.4300      15.1        59       104        60
OIR    2025250     91400   17.7200 -111.4400      15.2        57       107        60
OIR    2025250     91400   17.7200 -111.4500      15.6        55       109        60
OIR    2025250     91400   17.7200 -111.4600      15.7        55       111        60
OIR    2025250     91400   17.7200 -111.4700      15.6        55       114        60
OIR    2025250     91400   17.7200 -111.4800      14.5        58       124        60
OIR    2025250     91400   17.7200 -111.4900      13.1        71       136        60
OIR    2025250     91400   17.7200 -111.5000      12.5        77       143        60
OIR    2025250     91400   17.7200 -111.6400       9.1        56       142        60
OIR    2025250     91400   17.7200 -111.6500      10.7        57       136        60
OIR    2025250     91400   17.7200 -111.6600      11.5        58       132        60
OIR    2025250     91400   17.7200 -111.6700      12.9        58       134        60
OIR    2025250     91400   17.7200 -111.6800      13.3        58       135        60
OIR    2025250     91400   17.7200 -111.6900      13.5        58       134        60
OIR    2025250     91400   17.7200 -111.7000      13.6        58       133        60
OIR    2025250     91400   17.7200 -111.7100      13.7        57       136        60
OIR    2025250     91400   17.7200 -111.7200      13.9        57       141        60
OIR    2025250     91400   17.7200 -111.7700      14.5        53       144        60
OIR    2025250     91400   17.7200 -111.7800      14.7        53       143        60
OIR    2025250     91400   17.7200 -111.7900      14.9        52       144        60
OIR    2025250     91400   17.7200 -111.8000      15.1        52       144        60
OIR    2025250     91400   17.7200 -111.8100      15.3        52       143        60
OIR    2025250     91400   17.7200 -111.8200      15.4        52       143        60
OIR    2025250     91400   17.7200 -111.8300      15.5        52       144        60
OIR    2025250     91400   17.7200 -111.9300      15.0        48       144        60
OIR    2025250     91400   17.7200 -111.9400      15.0        48       143        60
OIR    2025250     91400   17.7200 -111.9500      15.0        48       143        60
OIR    2025250     91400   17.7200 -111.9600      15.0        48       143        60
OIR    2025250     91400   17.7200 -112.0300      14.8        47       143        60
OIR    2025250     91400   17.7200 -112.0400      14.7        47       140        60
OIR    2025250     91400   17.7200 -112.0500      14.6        47       137        60
OIR    2025250     91400   17.7200 -112.0600      14.6        47       137        60
OIR    2025250     91400   17.7200 -112.0700      14.6        47       138        60
OIR    2025250     91400   17.7200 -112.0800      14.6        47       139        60
OIR    2025250     91400   17.7200 -112.0900      14.6        47       140        60
OIR    2025250     91400   17.7200 -112.1000      14.6        47       140        60
OIR    2025250     91400   17.7200 -112.1100      14.6        47       138        60
OIR    2025250     91400   17.7200 -112.1200      14.6        47       136        60
OIR    2025250     91400   17.7200 -112.1300      14.6        47       136        60
OIR    2025250     91400   17.7200 -112.1400      14.6        47       137        60
OIR    2025250     91400   17.7200 -112.1500      14.6        47       138        60
OIR    2025250     91400   17.7200 -112.1600      14.6        47       140        60
OIR    2025250     91400   17.7200 -112.1700      14.6        47       142        60
OIR    2025250     91400   17.7200 -112.1800      14.6        47       141        60
OIR    2025250     91400   17.7200 -112.1900      14.6        47       140        60
OIR    2025250     91400   17.7200 -112.2000      14.6        47       138        60
OIR    2025250     91400   17.7200 -112.2100      14.6        47       134        60
OIR    2025250     91400   17.7200 -112.2200      14.6        46       132        60
OIR    2025250     91400   17.7200 -112.2300      14.6        46       132        60
OIR    2025250     91400   17.7200 -112.2400      14.5        46       132        60
OIR    2025250     91400   17.7200 -112.2500      14.0        43       131        60
OIR    2025250     91400   17.7200 -112.2600      13.5        41       130        60
OIR    2025250     91400   17.7200 -112.2700      13.2        39       128        60
OIR    2025250     91400   17.7200 -112.2800      13.0        38       126        60
OIR    2025250     91400   17.7200 -112.2900      12.7        38       124        60
OIR    2025250     91400   17.7200 -112.3000      12.5        37       126        60
OIR    2025250     91400   17.7200 -112.3100      12.3        36       127        60
OIR    2025250     91400   17.7200 -112.3200      12.2        36       127        60
OIR    2025250     91400   17.7200 -112.3300      12.1        35       128        60
OIR    2025250     91400   17.7200 -112.3400      12.0        35       127        60
OIR    2025250     91400   17.7200 -112.3500      12.0        35       126        60
OIR    2025250     91400   17.7200 -112.3600      11.9        35       125        60
OIR    2025250     91400   17.7200 -112.3700      11.8        35       124        60
OIR    2025250     91400   17.7200 -112.3800      11.8        34       122        60
OIR    2025250     91400   17.7200 -112.3900      11.7        34       119        60
OIR    2025250     91400   17.7200 -112.4000      11.6        34       115        60
OIR    2025250     91400   17.7200 -112.4100      11.6        34       114        60
OIR    2025250     91400   17.7200 -112.4200      11.6        34       114        60
OIR    2025250     91400   17.7200 -112.4300      11.6        34       114        60
OIR    2025250     91400   17.7200 -112.4400      11.6        34       115        60
OIR    2025250     91400   17.7200 -112.4500      11.6        34       116        60
OIR    2025250     91400   17.7200 -112.4600      11.6        34       116        60
OIR    2025250     91400   17.7200 -112.4700      11.6        34       116        60
OIR    2025250     91400   17.7200 -112.4800      11.6        34       116        60
OIR    2025250     91400   17.7200 -112.4900      12.1        35       117        60
OIR    2025250     91400   17.7200 -112.5000      12.3        35       119        60
OIR    2025250     91400   17.7200 -112.5100      12.4        35       120        60
OIR    2025250     91400   17.7200 -112.5200      12.4        35       121        60
OIR    2025250     91400   17.7200 -112.5300      12.4        35       120        60
OIR    2025250     91400   17.7200 -112.5400      12.4        35       119        60
OIR    2025250     91400   17.7200 -112.5500      12.4        35       117        60
OIR    2025250     91400   17.7200 -112.5600      12.4        35       116        60
OIR    2025250     91400   17.7200 -112.5700      12.4        35       117        60
OIR    2025250     91400   17.7200 -112.5800      12.3        34       120        60
OIR    2025250     91400   17.7200 -112.5900      12.2        34       122        60
OIR    2025250     91400   17.7200 -112.6000      12.1        34       125        60
OIR    2025250     91400   17.7200 -112.6100      11.9        33       127        60
OIR    2025250     91400   17.7200 -112.6200      11.8        32       127        60
OIR    2025250     91400   17.7200 -112.6300      11.9        31       127        60
OIR    2025250     91400   17.7200 -112.6400      11.9        30       127        60
OIR    2025250     91400   17.7200 -112.6500      12.0        28       127        60
OIR    2025250     91400   17.7200 -112.6600      12.0        26       127        60
OIR    2025250     91400   17.7200 -112.6700      11.9        25       126        60
OIR    2025250     91400   17.7200 -112.6800      11.5        22       125        60
OIR    2025250     91400   17.7200 -112.6900      11.2        22       128        60
OIR    2025250     91400   17.7200 -112.7000      10.6        22       131        60
OIR    2025250     91400   17.7200 -112.7100       9.8        23       132        60
OIR    2025250     91400   17.7200 -112.7200       9.6        24       131        60
OIR    2025250     91400   17.7200 -112.7300       9.5        24       130        60
OIR    2025250     91400   17.7200 -112.7400       9.5        24       128        60
OIR    2025250     91400   17.7200 -112.7500       9.5        24       127        60
OIR    2025250     91400   17.7200 -112.7600       9.5        25       126        60
OIR    2025250     91400   17.7200 -112.7700       9.4        25       126        60
OIR    2025250     91400   17.7200 -112.7800       9.4        25       126        60
OIR    2025250     91400   17.7200 -112.7900       9.4        25       126        60
OIR    2025250     91400   17.7200 -112.8000       9.4        26       127        60
OIR    2025250     91400   17.7200 -112.8100       9.4        26       129        60
OIR    2025250     91400   17.7200 -112.8200       9.4        26       130        60
OIR    2025250     91400   17.7200 -112.8300       9.3        27       130        60
OIR    2025250     91400   17.7200 -112.8400       9.1        27       130        60
OIR    2025250     91400   17.7200 -112.8500       9.0        27       129        60
OIR    2025250     91400   17.7200 -112.8600       8.7        28       129        60
OIR    2025250     91400   17.7200 -112.8700       8.6        28       127        60
OIR    2025250     91400   17.7200 -112.8800       8.6        28       125        60
OIR    2025250     91400   17.7200 -112.8900       8.6        28       124        60
OIR    2025250     91400   17.7200 -112.9000       8.6        28       123        60
OIR    2025250     91400   17.7200 -112.9100       8.6        29       122        60
OIR    2025250     91400   17.7200 -112.9200       8.6        29       125        60
OIR    2025250     91400   17.7200 -112.9300       8.6        29       128        60
OIR    2025250     91400   17.7200 -112.9400       8.7        29       130        60
OIR    2025250     91400   17.7200 -112.9500       8.7        29       132        60
OIR    2025250     91400   17.7200 -112.9600       8.7        30       131        60
OIR    2025250     91400   17.7200 -112.9700       8.7        30       129        60
OIR    2025250     91400   17.7200 -112.9800       8.7        30       128        60
OIR    2025250     91400   17.7200 -112.9900       8.6        30       127        60
OIR    2025250     91400   17.7200 -113.0000       8.5        30       127        60
OIR    2025250     91400   17.7200 -113.0100       8.4        29       127        60
OIR    2025250     91400   17.7200 -113.0200       8.3        28       127        60
OIR    2025250     91400   17.7200 -113.0300       8.1        27       127        60
OIR    2025250     91400   17.7200 -113.0400       7.1        25       129        60
OIR    2025250     91400   17.7200 -113.0500       6.2        24       130        60
OIR    2025250     91400   17.7200 -113.0600       5.8        23       132        60
OIR    2025250     91400   17.7200 -113.0700       5.9        23       134        60
OIR    2025250     91400   17.7200 -113.0800       5.8        22       136        60
OIR    2025250     91400   17.7200 -113.0900       5.4        22       138        60
OIR    2025250     91400   17.7200 -113.1000       5.1        21       136        60
OIR    2025250     91400   17.7200 -113.1100       4.9        21       134        60
OIR    2025250     91400   17.7200 -113.1200       4.7        21       132        60
OIR    2025250     91400   17.7200 -113.1300       4.6        21       134        60
OIR    2025250     91400   17.7200 -113.1400       4.4        22       135        60
OIR    2025250     91400   17.7200 -113.1500       4.3        22       135        60
OIR    2025250     91400   17.7200 -113.1600       4.2        22       135        60
OIR    2025250     91400   17.7200 -113.1700       4.1        22       137        60
OIR    2025250     91400   17.7200 -113.1800       4.0        22       139        60
OIR    2025250     91400   17.7200 -113.1900       4.0        22       140        60
OIR    2025250     91400   17.7200 -113.2000       4.0        22       142        60
OIR    2025250     91400   17.7200 -113.2100       4.1        22       143        60
OIR    2025250     91400   17.7200 -113.2200       4.1        23       143        60
OIR    2025250     91400   17.7200 -113.2300       4.4        23       143        60
OIR    2025250     91400   17.7200 -113.2400       4.9        22       143        60
OIR    2025250     91400   17.7200 -113.2500       5.4        19       144        60
OIR    2025250     91400   17.7200 -113.2600       5.9        17       143        60
OIR    2025250     91400   17.7200 -113.2700       6.3        15       140        60
OIR    2025250     91400   17.7200 -113.2800       6.8        14       139        60
OIR    2025250     91400   17.7200 -113.2900       7.3        13       138        60
OIR    2025250     91400   17.7200 -113.3000       7.5        13       137        60
OIR    2025250     91400   17.7200 -113.3100       7.5        13       134        60
OIR    2025250     91400   17.7200 -113.3200       7.5        13       132        60
OIR    2025250     91400   17.7200 -113.3300       7.5        13       132        60
OIR    2025250     91400   17.7200 -113.3400       7.6        13       133        60
OIR    2025250     91400   17.7200 -113.3500       7.7        13       134        60
OIR    2025250     91400   17.7200 -113.3600       7.8        14       135        60
OIR    2025250     91400   17.7200 -113.3700       8.3        15       136        60
OIR    2025250     91400   17.7200 -113.3800       9.0        16       136        60
OIR    2025250     91400   17.7200 -113.3900       9.8        18       135        60
OIR    2025250     91400   17.7200 -113.4000      10.5        19       135        60
OIR    2025250     91400   17.7200 -113.4100      10.8        20       134        60
OIR    2025250     91400   17.7200 -113.4200      10.9        20       133        60
OIR    2025250     91400   17.7200 -113.4300      11.0        20       132        60
OIR    2025250     91400   17.7200 -113.4400      11.0        20       131        60
OIR    2025250     91400   17.7200 -113.4500      10.9        19       132        60
OIR    2025250     91400   17.7200 -113.4600      10.9        18       133        60
OIR    2025250     91400   17.7200 -113.4700      11.0        17       132        60
OIR    2025250     91400   17.7200 -113.4800      11.0        16       131        60
OIR    2025250     91400   17.7200 -113.4900      10.9        15       132        60
OIR    2025250     91400   17.7200 -113.5000      10.7        14       133        60
OIR    2025250     91400   17.7200 -113.5100      10.3        13       136        60
OIR    2025250     91400   17.7200 -113.5200       9.9        10       140        60
OIR    2025250     91400   17.7200 -113.5300       9.5         7       142        60
OIR    2025250     91400   17.7200 -113.5400       9.2         3       141        60
OIR    2025250     91400   17.7200 -113.5500       8.9         0       140        60
OIR    2025250     91400   17.7200 -113.5600       8.6       359       137        60
OIR    2025250     91400   17.7200 -113.5700       8.5       358       134        60
OIR    2025250     91400   17.7200 -113.5800       8.4       357       133        60
OIR    2025250     91400   17.7200 -113.5900       8.4       357       132        60
OIR    2025250     91400   17.7200 -113.6000       8.4       357       132        60
OIR    2025250     91400   17.7200 -113.6100       8.3       356       131        60
OIR    2025250     91400   17.7200 -113.6200       8.3       356       131        60
OIR    2025250     91400   17.7200 -113.6300       8.3       356       132        60
OIR    2025250     91400   17.7200 -113.6400       8.3       356       134        60
OIR    2025250     91400   17.7200 -113.6500       8.2       356       134        60
OIR    2025250     91400   17.7200 -113.6600       8.2       356       134        60
OIR    2025250     91400   17.7200 -113.6700       8.2       356       134        60
OIR    2025250     91400   17.7200 -113.6800       8.2       356       134        60
OIR    2025250     91400   17.7200 -113.6900       8.1       356       137        60
OIR    2025250     91400   17.7200 -113.7000       8.1       356       143        60
OIR    2025250     91400   17.7200 -113.7500       8.0       357       143        60
OIR    2025250     91400   17.7200 -113.7600       8.0       357       142        60
OIR    2025250     91400   17.7200 -113.7700       7.9       358       142        60
OIR    2025250     91400   17.7200 -113.7800       7.9       358       142        60
OIR    2025250     91400   17.7200 -113.7900       7.8       358       143        60
OIR    2025250     91400   17.7200 -113.8000       7.8       359       142        60
OIR    2025250     91400   17.7200 -113.8100       7.7       359       140        60
OIR    2025250     91400   17.7200 -113.8200       7.7       360       138        60
OIR    2025250     91400   17.7200 -113.8300       7.6         0       136        60
OIR    2025250     91400   17.7200 -113.8400       7.6         0       134        60
OIR    2025250     91400   17.7200 -113.8500       7.6         1       134        60
OIR    2025250     91400   17.7200 -113.8600       7.6         1       137        60
OIR    2025250     91400   17.7200 -113.8700       7.6         1       140        60
OIR    2025250     91400   17.7200 -113.8800       7.5         2       139        60
OIR    2025250     91400   17.7200 -113.8900       7.6         2       137        60
OIR    2025250     91400   17.7200 -113.9000       7.6         2       137        60
OIR    2025250     91400   17.7200 -113.9100       7.6         1       136        60
OIR    2025250     91400   17.7200 -113.9200       7.5         1       137        60
OIR    2025250     91400   17.7200 -113.9300       7.4         0       137        60
OIR    2025250     91400   17.7200 -113.9400       7.4         0       138        60
OIR    2025250     91400   17.7200 -113.9500       7.4       360       140        60
OIR    2025250     91400   17.7200 -113.9600       7.4       360       140        60
OIR    2025250     91400   17.7200 -113.9700       7.4       360       138        60
OIR    2025250     91400   17.7200 -113.9800       7.4       360       135        60
OIR    2025250     91400   17.7200 -113.9900       7.4       360       137        60
OIR    2025250     91400   17.7200 -114.0000       7.4       360       140        60
OIR    2025250     91400   17.7200 -114.0100       7.4       359       140        60
OIR    2025250     91400   17.7200 -114.0200       7.4       359       140        60
OIR    2025250     91400   17.7200 -114.0300       7.4       359       139        60
OIR    2025250     91400   17.7200 -114.0400       7.3       359       138        60
OIR    2025250     91400   17.7200 -114.0500       7.3       358       137        60
OIR    2025250     91400   17.7200 -114.0600       7.3       357       137        60
OIR    2025250     91400   17.7200 -114.0700       7.3       355       138        60
OIR    2025250     91400   17.7200 -114.0800       7.4       354       138        60
OIR    2025250     91400   17.7200 -114.0900       7.5       353       139        60
OIR    2025250     91400   17.7200 -114.1000       7.6       352       138        60
OIR    2025250     91400   17.7200 -114.1100       7.6       352       137        60
OIR    2025250     91400   17.7200 -114.1200       7.6       352       135        60
OIR    2025250     91400   17.7200 -114.1300       7.6       352       134        60
OIR    2025250     91400   17.7200 -114.1400       7.6       352       133        60
OIR    2025250     91400   17.7200 -114.1500       7.6       351       133        60
OIR    2025250     91400   17.7200 -114.1600       7.7       351       133        60
OIR    2025250     91400   17.7200 -114.1700       7.7       351       134        60
OIR    2025250     91400   17.7200 -114.1800       7.7       351       135        60
OIR    2025250     91400   17.7200 -114.1900       7.7       351       138        60
OIR    2025250     91400   17.7100 -110.6100      16.3        59       140        60
OIR    2025250     91400   17.7100 -110.6200      16.2        60       135        60
OIR    2025250     91400   17.7100 -110.6300      16.0        60       132        60
OIR    2025250     91400   17.7100 -110.6400      15.5        61       131        60
OIR    2025250     91400   17.7100 -110.6500      15.2        61       130        60
OIR    2025250     91400   17.7100 -110.6600      15.1        62       130        60
OIR    2025250     91400   17.7100 -110.6700      15.0        62       129        60
OIR    2025250     91400   17.7100 -110.6800      15.0        62       127        60
OIR    2025250     91400   17.7100 -110.6900      15.0        62       125        60
OIR    2025250     91400   17.7100 -110.7000      14.9        62       123        60
OIR    2025250     91400   17.7100 -110.7100      14.9        62       121        60
OIR    2025250     91400   17.7100 -110.7200      14.9        62       122        60
OIR    2025250     91400   17.7100 -110.7300      14.8        62       126        60
OIR    2025250     91400   17.7100 -110.7400      14.8        62       131        60
OIR    2025250     91400   17.7100 -110.7500      14.8        62       134        60
OIR    2025250     91400   17.7100 -110.7600      14.7        62       136        60
OIR    2025250     91400   17.7100 -110.7700      14.7        62       138        60
OIR    2025250     91400   17.7100 -110.7800      14.7        62       141        60
OIR    2025250     91400   17.7100 -110.7900      14.7        62       143        60
OIR    2025250     91400   17.7100 -111.2900      18.5        58       137        60
OIR    2025250     91400   17.7100 -111.3000      19.2        59       126        60
OIR    2025250     91400   17.7100 -111.3100      19.6        60       116        60
OIR    2025250     91400   17.7100 -111.3200      19.9        61       111        60
OIR    2025250     91400   17.7100 -111.3300      19.8        62       104        60
OIR    2025250     91400   17.7100 -111.3400      18.7        61       103        60
OIR    2025250     91400   17.7100 -111.3500      17.7        60       103        60
OIR    2025250     91400   17.7100 -111.3600      17.5        60       103        60
OIR    2025250     91400   17.7100 -111.3700      17.4        60       103        60
OIR    2025250     91400   17.7100 -111.3800      16.6        58       103        60
OIR    2025250     91400   17.7100 -111.3900      15.9        58       103        60
OIR    2025250     91400   17.7100 -111.4000      15.5        58       103        60
OIR    2025250     91400   17.7100 -111.4100      15.4        58       103        60
OIR    2025250     91400   17.7100 -111.4200      15.4        58       103        60
OIR    2025250     91400   17.7100 -111.4300      15.4        58       104        60
OIR    2025250     91400   17.7100 -111.4400      15.4        58       104        60
OIR    2025250     91400   17.7100 -111.4500      15.4        58       104        60
OIR    2025250     91400   17.7100 -111.4600      15.4        58       107        60
OIR    2025250     91400   17.7100 -111.4700      15.2        57       108        60
OIR    2025250     91400   17.7100 -111.4800      14.2        61       113        60
OIR    2025250     91400   17.7100 -111.4900      13.0        72       119        60
OIR    2025250     91400   17.7100 -111.5000      12.7        75       124        60
OIR    2025250     91400   17.7100 -111.5100      12.2        82       128        60
OIR    2025250     91400   17.7100 -111.5200      12.0        84       132        60
OIR    2025250     91400   17.7100 -111.5300      11.5        86       136        60
OIR    2025250     91400   17.7100 -111.5400      10.4        84       139        60
OIR    2025250     91400   17.7100 -111.6500       9.9        57       140        60
OIR    2025250     91400   17.7100 -111.6600      10.8        57       135        60
OIR    2025250     91400   17.7100 -111.6700      12.5        58       136        60
OIR    2025250     91400   17.7100 -111.6800      13.1        58       137        60
OIR    2025250     91400   17.7100 -111.6900      13.5        57       136        60
OIR    2025250     91400   17.7100 -111.7000      13.7        57       135        60
OIR    2025250     91400   17.7100 -111.7100      13.9        56       135        60
OIR    2025250     91400   17.7100 -111.7200      14.0        56       140        60
OIR    2025250     91400   17.7100 -111.7900      15.0        51       144        60
OIR    2025250     91400   17.7100 -111.8000      15.2        51       143        60
OIR    2025250     91400   17.7100 -111.8100      15.3        51       142        60
OIR    2025250     91400   17.7100 -111.8200      15.4        51       141        60
OIR    2025250     91400   17.7100 -111.8300      15.5        51       143        60
OIR    2025250     91400   17.7100 -111.9400      15.0        48       144        60
OIR    2025250     91400   17.7100 -112.0400      14.7        47       144        60
OIR    2025250     91400   17.7100 -112.0500      14.6        47       142        60
OIR    2025250     91400   17.7100 -112.0600      14.6        47       140        60
OIR    2025250     91400   17.7100 -112.0700      14.6        47       140        60
OIR    2025250     91400   17.7100 -112.0800      14.6        47       140        60
OIR    2025250     91400   17.7100 -112.0900      14.6        47       140        60
OIR    2025250     91400   17.7100 -112.1000      14.6        47       140        60
OIR    2025250     91400   17.7100 -112.1100      14.6        47       139        60
OIR    2025250     91400   17.7100 -112.1200      14.6        47       138        60
OIR    2025250     91400   17.7100 -112.1300      14.6        47       137        60
OIR    2025250     91400   17.7100 -112.1400      14.6        47       137        60
OIR    2025250     91400   17.7100 -112.1500      14.6        47       136        60
OIR    2025250     91400   17.7100 -112.1600      14.6        47       137        60
OIR    2025250     91400   17.7100 -112.1700      14.6        47       138        60
OIR    2025250     91400   17.7100 -112.1800      14.6        47       138        60
OIR    2025250     91400   17.7100 -112.1900      14.6        47       139        60
OIR    2025250     91400   17.7100 -112.2000      14.6        47       138        60
OIR    2025250     91400   17.7100 -112.2100      14.6        47       136        60
OIR    2025250     91400   17.7100 -112.2200      14.6        46       134        60
OIR    2025250     91400   17.7100 -112.2300      14.6        46       132        60
OIR    2025250     91400   17.7100 -112.2400      14.6        46       131        60
OIR    2025250     91400   17.7100 -112.2500      14.2        43       130        60
OIR    2025250     91400   17.7100 -112.2600      13.8        40       130        60
OIR    2025250     91400   17.7100 -112.2700      13.6        39       129        60
OIR    2025250     91400   17.7100 -112.2800      13.3        38       127        60
OIR    2025250     91400   17.7100 -112.2900      13.0        38       125        60
OIR    2025250     91400   17.7100 -112.3000      12.7        37       126        60
OIR    2025250     91400   17.7100 -112.3100      12.5        36       128        60
OIR    2025250     91400   17.7100 -112.3200      12.3        36       128        60
OIR    2025250     91400   17.7100 -112.3300      12.2        36       129        60
OIR    2025250     91400   17.7100 -112.3400      12.1        35       129        60
OIR    2025250     91400   17.7100 -112.3500      12.1        35       127        60
OIR    2025250     91400   17.7100 -112.3600      11.9        35       126        60
OIR    2025250     91400   17.7100 -112.3700      11.9        34       126        60
OIR    2025250     91400   17.7100 -112.3800      11.8        34       125        60
OIR    2025250     91400   17.7100 -112.3900      11.7        34       121        60
OIR    2025250     91400   17.7100 -112.4000      11.7        34       117        60
OIR    2025250     91400   17.7100 -112.4100      11.6        34       116        60
OIR    2025250     91400   17.7100 -112.4200      11.6        34       116        60
OIR    2025250     91400   17.7100 -112.4300      11.6        34       116        60
OIR    2025250     91400   17.7100 -112.4400      11.6        34       116        60
OIR    2025250     91400   17.7100 -112.4500      11.6        34       117        60
OIR    2025250     91400   17.7100 -112.4600      11.6        34       116        60
OIR    2025250     91400   17.7100 -112.4700      11.6        34       116        60
OIR    2025250     91400   17.7100 -112.4800      11.6        34       116        60
OIR    2025250     91400   17.7100 -112.4900      11.9        35       119        60
OIR    2025250     91400   17.7100 -112.5000      12.4        35       120        60
OIR    2025250     91400   17.7100 -112.5100      12.5        35       120        60
OIR    2025250     91400   17.7100 -112.5200      12.5        35       119        60
OIR    2025250     91400   17.7100 -112.5300      12.5        35       117        60
OIR    2025250     91400   17.7100 -112.5400      12.5        35       117        60
OIR    2025250     91400   17.7100 -112.5500      12.5        35       117        60
OIR    2025250     91400   17.7100 -112.5600      12.5        35       117        60
OIR    2025250     91400   17.7100 -112.5700      12.5        35       119        60
OIR    2025250     91400   17.7100 -112.5800      12.4        34       121        60
OIR    2025250     91400   17.7100 -112.5900      12.4        34       122        60
OIR    2025250     91400   17.7100 -112.6000      12.4        34       126        60
OIR    2025250     91400   17.7100 -112.6100      12.4        33       129        60
OIR    2025250     91400   17.7100 -112.6200      12.1        32       131        60
OIR    2025250     91400   17.7100 -112.6300      12.1        31       131        60
OIR    2025250     91400   17.7100 -112.6400      12.2        29       131        60
OIR    2025250     91400   17.7100 -112.6500      12.4        28       130        60
OIR    2025250     91400   17.7100 -112.6600      12.5        26       130        60
OIR    2025250     91400   17.7100 -112.6700      12.5        25       130        60
OIR    2025250     91400   17.7100 -112.6800      12.1        22       130        60
OIR    2025250     91400   17.7100 -112.6900      11.8        20       132        60
OIR    2025250     91400   17.7100 -112.7000      11.2        20       134        60
OIR    2025250     91400   17.7100 -112.7100      10.1        22       134        60
OIR    2025250     91400   17.7100 -112.7200       9.7        23       133        60
OIR    2025250     91400   17.7100 -112.7300       9.6        24       132        60
OIR    2025250     91400   17.7100 -112.7400       9.5        24       129        60
OIR    2025250     91400   17.7100 -112.7500       9.5        24       127        60
OIR    2025250     91400   17.7100 -112.7600       9.5        25       126        60
OIR    2025250     91400   17.7100 -112.7700       9.5        25       126        60
OIR    2025250     91400   17.7100 -112.7800       9.5        25       126        60
OIR    2025250     91400   17.7100 -112.7900       9.5        25       127        60
OIR    2025250     91400   17.7100 -112.8000       9.5        26       128        60
OIR    2025250     91400   17.7100 -112.8100       9.5        26       131        60
OIR    2025250     91400   17.7100 -112.8200       9.5        26       133        60
OIR    2025250     91400   17.7100 -112.8300       9.4        26       132        60
OIR    2025250     91400   17.7100 -112.8400       9.3        26       131        60
OIR    2025250     91400   17.7100 -112.8500       9.1        27       130        60
OIR    2025250     91400   17.7100 -112.8600       8.8        28       130        60
OIR    2025250     91400   17.7100 -112.8700       8.7        28       129        60
OIR    2025250     91400   17.7100 -112.8800       8.6        28       127        60
OIR    2025250     91400   17.7100 -112.8900       8.6        28       126        60
OIR    2025250     91400   17.7100 -112.9000       8.6        28       126        60
OIR    2025250     91400   17.7100 -112.9100       8.6        29       125        60
OIR    2025250     91400   17.7100 -112.9200       8.6        29       127        60
OIR    2025250     91400   17.7100 -112.9300       8.7        29       129        60
OIR    2025250     91400   17.7100 -112.9400       8.7        29       131        60
OIR    2025250     91400   17.7100 -112.9500       8.7        29       133        60
OIR    2025250     91400   17.7100 -112.9600       8.8        29       134        60
OIR    2025250     91400   17.7100 -112.9700       8.8        29       131        60
OIR    2025250     91400   17.7100 -112.9800       8.8        29       129        60
OIR    2025250     91400   17.7100 -112.9900       8.7        29       129        60
OIR    2025250     91400   17.7100 -113.0000       8.6        29       128        60
OIR    2025250     91400   17.7100 -113.0100       8.5        28       128        60
OIR    2025250     91400   17.7100 -113.0200       8.4        28       128        60
OIR    2025250     91400   17.7100 -113.0300       8.4        27       129        60
OIR    2025250     91400   17.7100 -113.0400       8.1        26       130        60
OIR    2025250     91400   17.7100 -113.0500       7.8        25       131        60
OIR    2025250     91400   17.7100 -113.0600       7.5        25       132        60
OIR    2025250     91400   17.7100 -113.0700       7.4        25       133        60
OIR    2025250     91400   17.7100 -113.0800       7.2        24       134        60
OIR    2025250     91400   17.7100 -113.0900       6.9        24       135        60
OIR    2025250     91400   17.7100 -113.1000       6.2        24       134        60
OIR    2025250     91400   17.7100 -113.1100       5.5        23       132        60
OIR    2025250     91400   17.7100 -113.1200       5.0        22       131        60
OIR    2025250     91400   17.7100 -113.1300       4.7        22       132        60
OIR    2025250     91400   17.7100 -113.1400       4.5        22       133        60
OIR    2025250     91400   17.7100 -113.1500       4.3        21       135        60
OIR    2025250     91400   17.7100 -113.1600       4.2        21       137        60
OIR    2025250     91400   17.7100 -113.1700       4.0        21       139        60
OIR    2025250     91400   17.7100 -113.1800       4.0        21       142        60
OIR    2025250     91400   17.7100 -113.2600       6.1        15       143        60
OIR    2025250     91400   17.7100 -113.2700       6.5        14       142        60
OIR    2025250     91400   17.7100 -113.2800       7.1        14       140        60
OIR    2025250     91400   17.7100 -113.2900       7.4        13       137        60
OIR    2025250     91400   17.7100 -113.3000       7.5        13       134        60
OIR    2025250     91400   17.7100 -113.3100       7.5        13       132        60
OIR    2025250     91400   17.7100 -113.3200       7.5        13       130        60
OIR    2025250     91400   17.7100 -113.3300       7.6        13       131        60
OIR    2025250     91400   17.7100 -113.3400       7.7        13       132        60
OIR    2025250     91400   17.7100 -113.3500       7.9        14       133        60
OIR    2025250     91400   17.7100 -113.3600       8.2        15       135        60
OIR    2025250     91400   17.7100 -113.3700       8.7        16       137        60
OIR    2025250     91400   17.7100 -113.3800       9.5        18       138        60
OIR    2025250     91400   17.7100 -113.3900      10.3        20       139        60
OIR    2025250     91400   17.7100 -113.4000      10.8        20       139        60
OIR    2025250     91400   17.7100 -113.4100      11.0        20       140        60
OIR    2025250     91400   17.7100 -113.4200      11.0        20       138        60
OIR    2025250     91400   17.7100 -113.4300      11.0        20       135        60
OIR    2025250     91400   17.7100 -113.4400      11.1        20       133        60
OIR    2025250     91400   17.7100 -113.4500      11.0        20       133        60
OIR    2025250     91400   17.7100 -113.4600      11.0        19       134        60
OIR    2025250     91400   17.7100 -113.4700      11.0        18       133        60
OIR    2025250     91400   17.7100 -113.4800      11.0        17       133        60
OIR    2025250     91400   17.7100 -113.4900      11.0        16       134        60
OIR    2025250     91400   17.7100 -113.5000      10.9        16       137        60
OIR    2025250     91400   17.7100 -113.5100      10.7        15       139        60
OIR    2025250     91400   17.7100 -113.5200      10.3        13       141        60
OIR    2025250     91400   17.7100 -113.5300      10.0        10       141        60
OIR    2025250     91400   17.7100 -113.5400       9.6         7       140        60
OIR    2025250     91400   17.7100 -113.5500       9.2         3       139        60
OIR    2025250     91400   17.7100 -113.5600       8.8       360       138        60
OIR    2025250     91400   17.7100 -113.5700       8.6       358       137        60
OIR    2025250     91400   17.7100 -113.5800       8.5       357       136        60
OIR    2025250     91400   17.7100 -113.5900       8.5       357       134        60
OIR    2025250     91400   17.7100 -113.6000       8.5       357       132        60
OIR    2025250     91400   17.7100 -113.6100       8.4       357       132        60
OIR    2025250     91400   17.7100 -113.6200       8.3       356       131        60
OIR    2025250     91400   17.7100 -113.6300       8.3       356       132        60
OIR    2025250     91400   17.7100 -113.6400       8.3       356       133        60
OIR    2025250     91400   17.7100 -113.6500       8.2       356       134        60
OIR    2025250     91400   17.7100 -113.6600       8.2       357       136        60
OIR    2025250     91400   17.7100 -113.6700       8.2       357       137        60
OIR    2025250     91400   17.7100 -113.6800       8.2       357       137        60
OIR    2025250     91400   17.7100 -113.6900       8.1       357       138        60
OIR    2025250     91400   17.7100 -113.7000       8.1       357       144        60
OIR    2025250     91400   17.7100 -113.7500       8.1       358       144        60
OIR    2025250     91400   17.7100 -113.7600       8.0       358       142        60
OIR    2025250     91400   17.7100 -113.7700       8.0       358       143        60
OIR    2025250     91400   17.7100 -113.7800       7.9       358       143        60
OIR    2025250     91400   17.7100 -113.7900       7.9       358       143        60
OIR    2025250     91400   17.7100 -113.8000       7.8       359       143        60
OIR    2025250     91400   17.7100 -113.8100       7.8       359       142        60
OIR    2025250     91400   17.7100 -113.8200       7.7       360       141        60
OIR    2025250     91400   17.7100 -113.8300       7.7         0       138        60
OIR    2025250     91400   17.7100 -113.8400       7.6         0       135        60
OIR    2025250     91400   17.7100 -113.8500       7.6         0       135        60
OIR    2025250     91400   17.7100 -113.8600       7.6         1       137        60
OIR    2025250     91400   17.7100 -113.8700       7.6         1       140        60
OIR    2025250     91400   17.7100 -113.8800       7.7         1       141        60
OIR    2025250     91400   17.7100 -113.8900       7.7         1       141        60
OIR    2025250     91400   17.7100 -113.9000       7.7         1       139        60
OIR    2025250     91400   17.7100 -113.9100       7.7         1       135        60
OIR    2025250     91400   17.7100 -113.9200       7.7         1       135        60
OIR    2025250     91400   17.7100 -113.9300       7.5         0       138        60
OIR    2025250     91400   17.7100 -113.9400       7.5         0       140        60
OIR    2025250     91400   17.7100 -113.9500       7.4       360       141        60
OIR    2025250     91400   17.7100 -113.9600       7.4       360       141        60
OIR    2025250     91400   17.7100 -113.9700       7.4       360       137        60
OIR    2025250     91400   17.7100 -113.9800       7.4       360       134        60
OIR    2025250     91400   17.7100 -113.9900       7.4       360       137        60
OIR    2025250     91400   17.7100 -114.0000       7.4       359       142        60
OIR    2025250     91400   17.7100 -114.0100       7.4       359       143        60
OIR    2025250     91400   17.7100 -114.0200       7.4       359       143        60
OIR    2025250     91400   17.7100 -114.0300       7.4       359       143        60
OIR    2025250     91400   17.7100 -114.0400       7.4       358       142        60
OIR    2025250     91400   17.7100 -114.0500       7.3       357       141        60
OIR    2025250     91400   17.7100 -114.0600       7.3       357       140        60
OIR    2025250     91400   17.7100 -114.0700       7.3       355       139        60
OIR    2025250     91400   17.7100 -114.0800       7.4       354       139        60
OIR    2025250     91400   17.7100 -114.0900       7.5       353       140        60
OIR    2025250     91400   17.7100 -114.1000       7.6       352       140        60
OIR    2025250     91400   17.7100 -114.1100       7.6       352       138        60
OIR    2025250     91400   17.7100 -114.1200       7.6       352       137        60
OIR    2025250     91400   17.7100 -114.1300       7.6       352       136        60
OIR    2025250     91400   17.7100 -114.1400       7.6       352       134        60
OIR    2025250     91400   17.7100 -114.1500       7.6       351       135        60
OIR    2025250     91400   17.7100 -114.1600       7.7       351       135        60
OIR    2025250     91400   17.7100 -114.1700       7.7       351       135        60
OIR    2025250     91400   17.7100 -114.1800       7.7       351       135        60
OIR    2025250     91400   17.7100 -114.1900       7.7       351       136        60
OIR    2025250     91400   17.7100 -114.2000       7.7       350       143        60
OIR    2025250     91400   17.7000 -110.6100      16.3        60       141        60
OIR    2025250     91400   17.7000 -110.6200      16.1        60       134        60
OIR    2025250     91400   17.7000 -110.6300      15.9        61       131        60
OIR    2025250     91400   17.7000 -110.6400      15.5        61       131        60
OIR    2025250     91400   17.7000 -110.6500      15.2        62       130        60
OIR    2025250     91400   17.7000 -110.6600      15.1        62       129        60
OIR    2025250     91400   17.7000 -110.6700      15.0        62       127        60
OIR    2025250     91400   17.7000 -110.6800      15.0        62       126        60
OIR    2025250     91400   17.7000 -110.6900      15.0        62       124        60
OIR    2025250     91400   17.7000 -110.7000      14.9        62       122        60
OIR    2025250     91400   17.7000 -110.7100      14.9        62       121        60
OIR    2025250     91400   17.7000 -110.7200      14.8        62       120        60
OIR    2025250     91400   17.7000 -110.7300      14.8        62       127        60
OIR    2025250     91400   17.7000 -110.7400      14.8        62       134        60
OIR    2025250     91400   17.7000 -110.7500      14.8        62       135        60
OIR    2025250     91400   17.7000 -110.7600      14.7        62       136        60
OIR    2025250     91400   17.7000 -110.7700      14.7        62       136        60
OIR    2025250     91400   17.7000 -110.7800      14.7        62       138        60
OIR    2025250     91400   17.7000 -110.7900      14.7        62       139        60
OIR    2025250     91400   17.7000 -110.8000      14.7        62       142        60
OIR    2025250     91400   17.7000 -111.2900      19.5        60       136        60
OIR    2025250     91400   17.7000 -111.3000      20.1        61       122        60
OIR    2025250     91400   17.7000 -111.3100      20.1        61       111        60
OIR    2025250     91400   17.7000 -111.3200      20.1        62       108        60
OIR    2025250     91400   17.7000 -111.3300      20.2        62       104        60
OIR    2025250     91400   17.7000 -111.3400      19.9        62       103        60
OIR    2025250     91400   17.7000 -111.3500      18.9        61       103        60
OIR    2025250     91400   17.7000 -111.3600      17.7        60       103        60
OIR    2025250     91400   17.7000 -111.3700      17.2        60       103        60
OIR    2025250     91400   17.7000 -111.3800      16.3        59       103        60
OIR    2025250     91400   17.7000 -111.3900      15.7        58       103        60
OIR    2025250     91400   17.7000 -111.4000      15.5        58       103        60
OIR    2025250     91400   17.7000 -111.4100      15.5        58       103        60
OIR    2025250     91400   17.7000 -111.4200      15.4        58       103        60
OIR    2025250     91400   17.7000 -111.4300      15.4        58       103        60
OIR    2025250     91400   17.7000 -111.4400      15.4        58       103        60
OIR    2025250     91400   17.7000 -111.4500      15.4        58       103        60
OIR    2025250     91400   17.7000 -111.4600      15.4        58       103        60
OIR    2025250     91400   17.7000 -111.4700      15.3        58       103        60
OIR    2025250     91400   17.7000 -111.4800      14.7        60       104        60
OIR    2025250     91400   17.7000 -111.4900      12.9        72       104        60
OIR    2025250     91400   17.7000 -111.5000      12.4        78       107        60
OIR    2025250     91400   17.7000 -111.5100      12.4        80       109        60
OIR    2025250     91400   17.7000 -111.5200      12.3        81       110        60
OIR    2025250     91400   17.7000 -111.5300      11.6        82       115        60
OIR    2025250     91400   17.7000 -111.5400      10.7        75       119        60
OIR    2025250     91400   17.7000 -111.5500       9.6        70       131        60
OIR    2025250     91400   17.7000 -111.6600       9.8        56       140        60
OIR    2025250     91400   17.7000 -111.6700      11.6        56       138        60
OIR    2025250     91400   17.7000 -111.6800      12.7        56       136        60
OIR    2025250     91400   17.7000 -111.6900      13.4        55       136        60
OIR    2025250     91400   17.7000 -111.7000      13.9        54       137        60
OIR    2025250     91400   17.7000 -111.7100      14.3        53       138        60
OIR    2025250     91400   17.7000 -111.7200      14.8        52       142        60
OIR    2025250     91400   17.7000 -111.7700      15.0        50       144        60
OIR    2025250     91400   17.7000 -111.7800      15.0        50       143        60
OIR    2025250     91400   17.7000 -111.7900      15.1        50       143        60
OIR    2025250     91400   17.7000 -111.8000      15.2        50       144        60
OIR    2025250     91400   17.7000 -111.8100      15.2        50       144        60
OIR    2025250     91400   17.7000 -111.8200      15.3        50       143        60
OIR    2025250     91400   17.7000 -111.8300      15.3        50       144        60
OIR    2025250     91400   17.7000 -112.0600      14.6        47       144        60
OIR    2025250     91400   17.7000 -112.0700      14.6        47       142        60
OIR    2025250     91400   17.7000 -112.0800      14.6        47       140        60
OIR    2025250     91400   17.7000 -112.0900      14.6        47       140        60
OIR    2025250     91400   17.7000 -112.1000      14.6        47       140        60
OIR    2025250     91400   17.7000 -112.1100      14.6        47       140        60
OIR    2025250     91400   17.7000 -112.1200      14.6        47       140        60
OIR    2025250     91400   17.7000 -112.1300      14.6        47       139        60
OIR    2025250     91400   17.7000 -112.1400      14.6        47       137        60
OIR    2025250     91400   17.7000 -112.1500      14.6        47       135        60
OIR    2025250     91400   17.7000 -112.1600      14.6        47       135        60
OIR    2025250     91400   17.7000 -112.1700      14.6        47       134        60
OIR    2025250     91400   17.7000 -112.1800      14.6        47       135        60
OIR    2025250     91400   17.7000 -112.1900      14.6        47       137        60
OIR    2025250     91400   17.7000 -112.2000      14.6        47       138        60
OIR    2025250     91400   17.7000 -112.2100      14.6        47       137        60
OIR    2025250     91400   17.7000 -112.2200      14.6        46       136        60
OIR    2025250     91400   17.7000 -112.2300      14.6        46       133        60
OIR    2025250     91400   17.7000 -112.2400      14.5        45       131        60
OIR    2025250     91400   17.7000 -112.2500      14.2        41       130        60
OIR    2025250     91400   17.7000 -112.2600      13.9        39       129        60
OIR    2025250     91400   17.7000 -112.2700      13.8        38       129        60
OIR    2025250     91400   17.7000 -112.2800      13.7        37       129        60
OIR    2025250     91400   17.7000 -112.2900      13.6        37       129        60
OIR    2025250     91400   17.7000 -112.3000      13.3        37       130        60
OIR    2025250     91400   17.7000 -112.3100      12.8        37       130        60
OIR    2025250     91400   17.7000 -112.3200      12.4        36       131        60
OIR    2025250     91400   17.7000 -112.3300      12.3        36       131        60
OIR    2025250     91400   17.7000 -112.3400      12.2        35       130        60
OIR    2025250     91400   17.7000 -112.3500      12.1        35       129        60
OIR    2025250     91400   17.7000 -112.3600      12.0        35       128        60
OIR    2025250     91400   17.7000 -112.3700      11.9        34       128        60
OIR    2025250     91400   17.7000 -112.3800      11.8        34       128        60
OIR    2025250     91400   17.7000 -112.3900      11.7        34       126        60
OIR    2025250     91400   17.7000 -112.4000      11.7        34       123        60
OIR    2025250     91400   17.7000 -112.4100      11.7        34       122        60
OIR    2025250     91400   17.7000 -112.4200      11.6        34       122        60
OIR    2025250     91400   17.7000 -112.4300      11.6        34       121        60
OIR    2025250     91400   17.7000 -112.4400      11.6        34       121        60
OIR    2025250     91400   17.7000 -112.4500      11.6        34       120        60
OIR    2025250     91400   17.7000 -112.4600      11.6        34       121        60
OIR    2025250     91400   17.7000 -112.4700      11.6        34       121        60
OIR    2025250     91400   17.7000 -112.4800      11.6        34       122        60
OIR    2025250     91400   17.7000 -112.4900      11.9        35       123        60
OIR    2025250     91400   17.7000 -112.5000      12.4        35       124        60
OIR    2025250     91400   17.7000 -112.5100      12.6        35       123        60
OIR    2025250     91400   17.7000 -112.5200      12.7        35       122        60
OIR    2025250     91400   17.7000 -112.5300      12.7        35       121        60
OIR    2025250     91400   17.7000 -112.5400      12.6        35       121        60
OIR    2025250     91400   17.7000 -112.5500      12.6        35       120        60
OIR    2025250     91400   17.7000 -112.5600      12.5        35       120        60
OIR    2025250     91400   17.7000 -112.5700      12.5        34       121        60
OIR    2025250     91400   17.7000 -112.5800      12.5        34       123        60
OIR    2025250     91400   17.7000 -112.5900      12.5        34       125        60
OIR    2025250     91400   17.7000 -112.6000      12.6        34       128        60
OIR    2025250     91400   17.7000 -112.6100      12.6        33       131        60
OIR    2025250     91400   17.7000 -112.6200      12.6        32       132        60
OIR    2025250     91400   17.7000 -112.6300      12.6        31       132        60
OIR    2025250     91400   17.7000 -112.6400      12.7        29       132        60
OIR    2025250     91400   17.7000 -112.6500      13.1        27       133        60
OIR    2025250     91400   17.7000 -112.6600      13.2        25       133        60
OIR    2025250     91400   17.7000 -112.6700      13.1        24       133        60
OIR    2025250     91400   17.7000 -112.6800      12.8        22       132        60
OIR    2025250     91400   17.7000 -112.6900      12.4        20       134        60
OIR    2025250     91400   17.7000 -112.7000      11.7        20       135        60
OIR    2025250     91400   17.7000 -112.7100      10.5        21       136        60
OIR    2025250     91400   17.7000 -112.7200       9.9        23       134        60
OIR    2025250     91400   17.7000 -112.7300       9.7        24       133        60
OIR    2025250     91400   17.7000 -112.7400       9.6        24       130        60
OIR    2025250     91400   17.7000 -112.7500       9.5        24       127        60
OIR    2025250     91400   17.7000 -112.7600       9.5        25       127        60
OIR    2025250     91400   17.7000 -112.7700       9.5        25       126        60
OIR    2025250     91400   17.7000 -112.7800       9.5        25       127        60
OIR    2025250     91400   17.7000 -112.7900       9.5        26       128        60
OIR    2025250     91400   17.7000 -112.8000       9.6        26       129        60
OIR    2025250     91400   17.7000 -112.8100       9.6        26       132        60
OIR    2025250     91400   17.7000 -112.8200       9.6        26       135        60
OIR    2025250     91400   17.7000 -112.8300       9.5        26       134        60
OIR    2025250     91400   17.7000 -112.8400       9.4        26       132        60
OIR    2025250     91400   17.7000 -112.8500       9.3        27       131        60
OIR    2025250     91400   17.7000 -112.8600       8.9        27       131        60
OIR    2025250     91400   17.7000 -112.8700       8.7        28       130        60
OIR    2025250     91400   17.7000 -112.8800       8.6        28       129        60
OIR    2025250     91400   17.7000 -112.8900       8.6        28       128        60
OIR    2025250     91400   17.7000 -112.9000       8.6        28       128        60
OIR    2025250     91400   17.7000 -112.9100       8.6        29       129        60
OIR    2025250     91400   17.7000 -112.9200       8.6        29       129        60
OIR    2025250     91400   17.7000 -112.9300       8.7        29       130        60
OIR    2025250     91400   17.7000 -112.9400       8.8        29       132        60
OIR    2025250     91400   17.7000 -112.9500       8.8        29       135        60
OIR    2025250     91400   17.7000 -112.9600       8.9        28       137        60
OIR    2025250     91400   17.7000 -112.9700       8.9        28       135        60
OIR    2025250     91400   17.7000 -112.9800       8.9        29       133        60
OIR    2025250     91400   17.7000 -112.9900       8.8        29       131        60
OIR    2025250     91400   17.7000 -113.0000       8.7        28       130        60
OIR    2025250     91400   17.7000 -113.0100       8.6        28       130        60
OIR    2025250     91400   17.7000 -113.0200       8.6        28       130        60
OIR    2025250     91400   17.7000 -113.0300       8.5        27       130        60
OIR    2025250     91400   17.7000 -113.0400       8.5        26       131        60
OIR    2025250     91400   17.7000 -113.0500       8.5        26       132        60
OIR    2025250     91400   17.7000 -113.0600       8.5        25       132        60
OIR    2025250     91400   17.7000 -113.0700       8.4        26       131        60
OIR    2025250     91400   17.7000 -113.0800       8.3        26       132        60
OIR    2025250     91400   17.7000 -113.0900       8.1        25       133        60
OIR    2025250     91400   17.7000 -113.1000       7.9        25       133        60
OIR    2025250     91400   17.7000 -113.1100       7.4        24       133        60
OIR    2025250     91400   17.7000 -113.1200       6.9        23       132        60
OIR    2025250     91400   17.7000 -113.1300       6.3        22       133        60
OIR    2025250     91400   17.7000 -113.1400       5.4        21       133        60
OIR    2025250     91400   17.7000 -113.1500       4.6        20       134        60
OIR    2025250     91400   17.7000 -113.1600       4.1        21       135        60
OIR    2025250     91400   17.7000 -113.1700       4.0        21       137        60
OIR    2025250     91400   17.7000 -113.1800       4.0        21       140        60
OIR    2025250     91400   17.7000 -113.1900       4.0        21       142        60
OIR    2025250     91400   17.7000 -113.2000       4.0        21       144        60
OIR    2025250     91400   17.7000 -113.2300       4.5        18       144        60
OIR    2025250     91400   17.7000 -113.2400       5.1        16       144        60
OIR    2025250     91400   17.7000 -113.2500       5.7        15       144        60
OIR    2025250     91400   17.7000 -113.2600       6.2        15       144        60
OIR    2025250     91400   17.7000 -113.2700       6.8        14       144        60
OIR    2025250     91400   17.7000 -113.2800       7.2        13       143        60
OIR    2025250     91400   17.7000 -113.2900       7.4        13       140        60
OIR    2025250     91400   17.7000 -113.3000       7.5        13       136        60
OIR    2025250     91400   17.7000 -113.3100       7.6        13       134        60
OIR    2025250     91400   17.7000 -113.3200       7.7        13       133        60
OIR    2025250     91400   17.7000 -113.3300       7.8        14       132        60
OIR    2025250     91400   17.7000 -113.3400       8.1        15       133        60
OIR    2025250     91400   17.7000 -113.3500       8.4        15       134        60
OIR    2025250     91400   17.7000 -113.3600       8.7        16       135        60
OIR    2025250     91400   17.7000 -113.3700       9.2        17       136        60
OIR    2025250     91400   17.7000 -113.3800       9.8        19       138        60
OIR    2025250     91400   17.7000 -113.3900      10.5        20       140        60
OIR    2025250     91400   17.7000 -113.4000      10.9        20       141        60
OIR    2025250     91400   17.7000 -113.4100      11.0        20       141        60
OIR    2025250     91400   17.7000 -113.4200      11.1        20       140        60
OIR    2025250     91400   17.7000 -113.4300      11.1        20       138        60
OIR    2025250     91400   17.7000 -113.4400      11.1        20       135        60
OIR    2025250     91400   17.7000 -113.4500      11.1        20       135        60
OIR    2025250     91400   17.7000 -113.4600      11.1        20       135        60
OIR    2025250     91400   17.7000 -113.4700      11.0        19       135        60
OIR    2025250     91400   17.7000 -113.4800      11.1        18       135        60
OIR    2025250     91400   17.7000 -113.4900      11.0        18       136        60
OIR    2025250     91400   17.7000 -113.5000      11.0        17       140        60
OIR    2025250     91400   17.7000 -113.5100      10.9        17       143        60
OIR    2025250     91400   17.7000 -113.5200      10.8        16       142        60
OIR    2025250     91400   17.7000 -113.5300      10.5        14       141        60
OIR    2025250     91400   17.7000 -113.5400      10.2        12       140        60
OIR    2025250     91400   17.7000 -113.5500       9.9         8       138        60
OIR    2025250     91400   17.7000 -113.5600       9.4         4       139        60
OIR    2025250     91400   17.7000 -113.5700       9.0         1       140        60
OIR    2025250     91400   17.7000 -113.5800       8.7       359       139        60
OIR    2025250     91400   17.7000 -113.5900       8.6       358       136        60
OIR    2025250     91400   17.7000 -113.6000       8.5       357       133        60
OIR    2025250     91400   17.7000 -113.6100       8.5       357       133        60
OIR    2025250     91400   17.7000 -113.6200       8.4       357       132        60
OIR    2025250     91400   17.7000 -113.6300       8.3       357       132        60
OIR    2025250     91400   17.7000 -113.6400       8.3       357       132        60
OIR    2025250     91400   17.7000 -113.6500       8.3       357       134        60
OIR    2025250     91400   17.7000 -113.6600       8.2       357       138        60
OIR    2025250     91400   17.7000 -113.6700       8.2       357       141        60
OIR    2025250     91400   17.7000 -113.6800       8.2       357       143        60
OIR    2025250     91400   17.7000 -113.6900       8.2       357       144        60
OIR    2025250     91400   17.7000 -113.7600       8.1       358       142        60
OIR    2025250     91400   17.7000 -113.7700       8.0       358       142        60
OIR    2025250     91400   17.7000 -113.7800       8.0       358       142        60
OIR    2025250     91400   17.7000 -113.7900       7.9       358       141        60
OIR    2025250     91400   17.7000 -113.8000       7.9       359       141        60
OIR    2025250     91400   17.7000 -113.8100       7.8       359       140        60
OIR    2025250     91400   17.7000 -113.8200       7.7       360       139        60
OIR    2025250     91400   17.7000 -113.8300       7.7       360       138        60
OIR    2025250     91400   17.7000 -113.8400       7.7         0       137        60
OIR    2025250     91400   17.7000 -113.8500       7.7         0       136        60
OIR    2025250     91400   17.7000 -113.8600       7.7         1       135        60
OIR    2025250     91400   17.7000 -113.8700       7.7         1       135        60
OIR    2025250     91400   17.7000 -113.8800       7.8         1       134        60
OIR    2025250     91400   17.7000 -113.8900       7.8         1       133        60
OIR    2025250     91400   17.7000 -113.9000       7.8         1       133        60
OIR    2025250     91400   17.7000 -113.9100       7.8         1       133        60
OIR    2025250     91400   17.7000 -113.9200       7.8         1       134        60
OIR    2025250     91400   17.7000 -113.9300       7.7         1       138        60
OIR    2025250     91400   17.7000 -113.9400       7.6         0       142        60
OIR    2025250     91400   17.7000 -113.9500       7.6         0       141        60
OIR    2025250     91400   17.7000 -113.9600       7.6       360       140        60
OIR    2025250     91400   17.7000 -113.9700       7.5       359       138        60
OIR    2025250     91400   17.7000 -113.9800       7.5       359       136        60
OIR    2025250     91400   17.7000 -113.9900       7.5       359       137        60
OIR    2025250     91400   17.7000 -114.0000       7.5       359       139        60
OIR    2025250     91400   17.7000 -114.0100       7.5       359       142        60
OIR    2025250     91400   17.7000 -114.0200       7.5       359       143        60
OIR    2025250     91400   17.7000 -114.0600       7.4       356       144        60
OIR    2025250     91400   17.7000 -114.0700       7.4       355       143        60
OIR    2025250     91400   17.7000 -114.0800       7.5       354       142        60
OIR    2025250     91400   17.7000 -114.0900       7.6       353       143        60
OIR    2025250     91400   17.7000 -114.1000       7.6       352       143        60
OIR    2025250     91400   17.7000 -114.1100       7.6       352       142        60
OIR    2025250     91400   17.7000 -114.1200       7.6       352       140        60
OIR    2025250     91400   17.7000 -114.1300       7.6       352       139        60
OIR    2025250     91400   17.7000 -114.1400       7.6       352       137        60
OIR    2025250     91400   17.7000 -114.1500       7.6       351       137        60
OIR    2025250     91400   17.7000 -114.1600       7.7       351       136        60
OIR    2025250     91400   17.7000 -114.1700       7.7       351       136        60
OIR    2025250     91400   17.7000 -114.1800       7.7       351       136        60
OIR    2025250     91400   17.7000 -114.1900       7.7       351       135        60
OIR    2025250     91400   17.7000 -114.2000       7.6       350       141        60
OIR    2025250     91400   17.6900 -110.6100      16.1        60       141        60
OIR    2025250     91400   17.6900 -110.6200      16.0        61       134        60
OIR    2025250     91400   17.6900 -110.6300      15.7        61       130        60
OIR    2025250     91400   17.6900 -110.6400      15.3        62       130        60
OIR    2025250     91400   17.6900 -110.6500      15.2        62       130        60
OIR    2025250     91400   17.6900 -110.6600      15.1        62       128        60
OIR    2025250     91400   17.6900 -110.6700      15.0        62       126        60
OIR    2025250     91400   17.6900 -110.6800      15.0        62       124        60
OIR    2025250     91400   17.6900 -110.6900      14.9        62       122        60
OIR    2025250     91400   17.6900 -110.7000      14.9        62       121        60
OIR    2025250     91400   17.6900 -110.7100      14.9        62       121        60
OIR    2025250     91400   17.6900 -110.7200      14.8        62       120        60
OIR    2025250     91400   17.6900 -110.7300      14.8        62       126        60
OIR    2025250     91400   17.6900 -110.7400      14.8        62       133        60
OIR    2025250     91400   17.6900 -110.7500      14.7        62       135        60
OIR    2025250     91400   17.6900 -110.7600      14.7        62       135        60
OIR    2025250     91400   17.6900 -110.7700      14.7        62       135        60
OIR    2025250     91400   17.6900 -110.7800      14.7        62       136        60
OIR    2025250     91400   17.6900 -110.7900      14.7        62       137        60
OIR    2025250     91400   17.6900 -110.8000      14.7        62       139        60
OIR    2025250     91400   17.6900 -110.8100      14.7        62       143        60
OIR    2025250     91400   17.6900 -111.2900      19.9        61       137        60
OIR    2025250     91400   17.6900 -111.3000      20.2        61       121        60
OIR    2025250     91400   17.6900 -111.3100      20.2        62       105        60
OIR    2025250     91400   17.6900 -111.3200      20.2        62       104        60
OIR    2025250     91400   17.6900 -111.3300      20.3        62       104        60
OIR    2025250     91400   17.6900 -111.3400      20.2        62       103        60
OIR    2025250     91400   17.6900 -111.3500      19.5        62       103        60
OIR    2025250     91400   17.6900 -111.3600      18.1        61       103        60
OIR    2025250     91400   17.6900 -111.3700      17.0        59       103        60
OIR    2025250     91400   17.6900 -111.3800      16.1        59       103        60
OIR    2025250     91400   17.6900 -111.3900      15.6        58       103        60
OIR    2025250     91400   17.6900 -111.4000      15.5        58       103        60
OIR    2025250     91400   17.6900 -111.4100      15.5        58       103        60
OIR    2025250     91400   17.6900 -111.4200      15.5        58       103        60
OIR    2025250     91400   17.6900 -111.4300      15.4        58       103        60
OIR    2025250     91400   17.6900 -111.4400      15.4        58       103        60
OIR    2025250     91400   17.6900 -111.4500      15.4        58       103        60
OIR    2025250     91400   17.6900 -111.4600      15.4        58       103        60
OIR    2025250     91400   17.6900 -111.4700      15.4        58       103        60
OIR    2025250     91400   17.6900 -111.4800      15.2        58       103        60
OIR    2025250     91400   17.6900 -111.4900      14.4        61       104        60
OIR    2025250     91400   17.6900 -111.5000      13.7        64       104        60
OIR    2025250     91400   17.6900 -111.5100      13.6        65       105        60
OIR    2025250     91400   17.6900 -111.5200      13.3        66       108        60
OIR    2025250     91400   17.6900 -111.5300      12.3        68       111        60
OIR    2025250     91400   17.6900 -111.5400      10.8        66       115        60
OIR    2025250     91400   17.6900 -111.5500      10.3        63       122        60
OIR    2025250     91400   17.6900 -111.5600      11.0        51       132        60
OIR    2025250     91400   17.6900 -111.5700      11.3        50       142        60
OIR    2025250     91400   17.6900 -111.6700      10.8        57       140        60
OIR    2025250     91400   17.6900 -111.6800      12.2        56       137        60
OIR    2025250     91400   17.6900 -111.6900      13.3        54       135        60
OIR    2025250     91400   17.6900 -111.7000      14.0        53       137        60
OIR    2025250     91400   17.6900 -111.7100      14.5        52       139        60
OIR    2025250     91400   17.6900 -111.7200      14.9        51       142        60
OIR    2025250     91400   17.6900 -111.7700      15.1        49       144        60
OIR    2025250     91400   17.6900 -111.7800      15.1        49       141        60
OIR    2025250     91400   17.6900 -111.7900      15.1        49       142        60
OIR    2025250     91400   17.6900 -111.8000      15.1        49       144        60
OIR    2025250     91400   17.6900 -112.0700      14.6        47       142        60
OIR    2025250     91400   17.6900 -112.0800      14.6        47       136        60
OIR    2025250     91400   17.6900 -112.0900      14.6        47       136        60
OIR    2025250     91400   17.6900 -112.1000      14.6        47       140        60
OIR    2025250     91400   17.6900 -112.1100      14.6        47       142        60
OIR    2025250     91400   17.6900 -112.1200      14.6        47       142        60
OIR    2025250     91400   17.6900 -112.1300      14.6        47       141        60
OIR    2025250     91400   17.6900 -112.1400      14.6        47       138        60
OIR    2025250     91400   17.6900 -112.1500      14.6        47       135        60
OIR    2025250     91400   17.6900 -112.1600      14.6        47       134        60
OIR    2025250     91400   17.6900 -112.1700      14.6        47       134        60
OIR    2025250     91400   17.6900 -112.1800      14.6        47       135        60
OIR    2025250     91400   17.6900 -112.1900      14.6        47       136        60
OIR    2025250     91400   17.6900 -112.2000      14.6        47       136        60
OIR    2025250     91400   17.6900 -112.2100      14.6        47       135        60
OIR    2025250     91400   17.6900 -112.2200      14.6        46       133        60
OIR    2025250     91400   17.6900 -112.2300      14.5        46       131        60
OIR    2025250     91400   17.6900 -112.2400      14.4        44       129        60
OIR    2025250     91400   17.6900 -112.2500      14.1        40       128        60
OIR    2025250     91400   17.6900 -112.2600      13.9        38       128        60
OIR    2025250     91400   17.6900 -112.2700      13.9        37       128        60
OIR    2025250     91400   17.6900 -112.2800      13.9        37       129        60
OIR    2025250     91400   17.6900 -112.2900      13.8        37       130        60
OIR    2025250     91400   17.6900 -112.3000      13.7        37       131        60
OIR    2025250     91400   17.6900 -112.3100      13.4        37       132        60
OIR    2025250     91400   17.6900 -112.3200      12.7        36       132        60
OIR    2025250     91400   17.6900 -112.3300      12.5        36       132        60
OIR    2025250     91400   17.6900 -112.3400      12.3        35       132        60
OIR    2025250     91400   17.6900 -112.3500      12.1        35       131        60
OIR    2025250     91400   17.6900 -112.3600      12.0        34       130        60
OIR    2025250     91400   17.6900 -112.3700      11.9        34       130        60
OIR    2025250     91400   17.6900 -112.3800      11.8        34       131        60
OIR    2025250     91400   17.6900 -112.3900      11.8        34       130        60
OIR    2025250     91400   17.6900 -112.4000      11.7        34       128        60
OIR    2025250     91400   17.6900 -112.4100      11.7        34       126        60
OIR    2025250     91400   17.6900 -112.4200      11.7        34       126        60
OIR    2025250     91400   17.6900 -112.4300      11.7        34       125        60
OIR    2025250     91400   17.6900 -112.4400      11.6        34       124        60
OIR    2025250     91400   17.6900 -112.4500      11.6        34       123        60
OIR    2025250     91400   17.6900 -112.4600      11.6        34       124        60
OIR    2025250     91400   17.6900 -112.4700      11.6        34       125        60
OIR    2025250     91400   17.6900 -112.4800      11.6        34       126        60
OIR    2025250     91400   17.6900 -112.4900      12.0        34       127        60
OIR    2025250     91400   17.6900 -112.5000      12.6        34       127        60
OIR    2025250     91400   17.6900 -112.5100      12.8        34       126        60
OIR    2025250     91400   17.6900 -112.5200      12.8        34       125        60
OIR    2025250     91400   17.6900 -112.5300      12.8        35       124        60
OIR    2025250     91400   17.6900 -112.5400      12.7        35       123        60
OIR    2025250     91400   17.6900 -112.5500      12.7        34       123        60
OIR    2025250     91400   17.6900 -112.5600      12.7        34       122        60
OIR    2025250     91400   17.6900 -112.5700      12.6        34       122        60
OIR    2025250     91400   17.6900 -112.5800      12.6        34       125        60
OIR    2025250     91400   17.6900 -112.5900      12.7        34       128        60
OIR    2025250     91400   17.6900 -112.6000      12.8        33       131        60
OIR    2025250     91400   17.6900 -112.6100      12.8        33       133        60
OIR    2025250     91400   17.6900 -112.6200      12.9        32       134        60
OIR    2025250     91400   17.6900 -112.6300      13.1        30       133        60
OIR    2025250     91400   17.6900 -112.6400      13.3        28       132        60
OIR    2025250     91400   17.6900 -112.6500      13.9        25       134        60
OIR    2025250     91400   17.6900 -112.6600      14.2        23       137        60
OIR    2025250     91400   17.6900 -112.6700      14.2        22       135        60
OIR    2025250     91400   17.6900 -112.6800      13.8        22       133        60
OIR    2025250     91400   17.6900 -112.6900      13.4        20       134        60
OIR    2025250     91400   17.6900 -112.7000      12.5        20       135        60
OIR    2025250     91400   17.6900 -112.7100      11.2        21       135        60
OIR    2025250     91400   17.6900 -112.7200      10.3        22       135        60
OIR    2025250     91400   17.6900 -112.7300      10.0        23       134        60
OIR    2025250     91400   17.6900 -112.7400       9.8        24       131        60
OIR    2025250     91400   17.6900 -112.7500       9.7        24       128        60
OIR    2025250     91400   17.6900 -112.7600       9.6        25       127        60
OIR    2025250     91400   17.6900 -112.7700       9.6        25       127        60
OIR    2025250     91400   17.6900 -112.7800       9.6        25       128        60
OIR    2025250     91400   17.6900 -112.7900       9.6        26       129        60
OIR    2025250     91400   17.6900 -112.8000       9.6        26       131        60
OIR    2025250     91400   17.6900 -112.8100       9.6        26       133        60
OIR    2025250     91400   17.6900 -112.8200       9.6        26       136        60
OIR    2025250     91400   17.6900 -112.8300       9.6        26       136        60
OIR    2025250     91400   17.6900 -112.8400       9.6        26       136        60
OIR    2025250     91400   17.6900 -112.8500       9.5        26       135        60
OIR    2025250     91400   17.6900 -112.8600       9.2        27       133        60
OIR    2025250     91400   17.6900 -112.8700       8.8        28       132        60
OIR    2025250     91400   17.6900 -112.8800       8.7        28       131        60
OIR    2025250     91400   17.6900 -112.8900       8.6        28       130        60
OIR    2025250     91400   17.6900 -112.9000       8.6        28       130        60
OIR    2025250     91400   17.6900 -112.9100       8.6        28       130        60
OIR    2025250     91400   17.6900 -112.9200       8.7        28       130        60
OIR    2025250     91400   17.6900 -112.9300       8.8        29       131        60
OIR    2025250     91400   17.6900 -112.9400       8.8        29       132        60
OIR    2025250     91400   17.6900 -112.9500       8.9        29       134        60
OIR    2025250     91400   17.6900 -112.9600       9.0        28       137        60
OIR    2025250     91400   17.6900 -112.9700       9.0        28       135        60
OIR    2025250     91400   17.6900 -112.9800       9.0        28       133        60
OIR    2025250     91400   17.6900 -112.9900       8.9        28       131        60
OIR    2025250     91400   17.6900 -113.0000       8.7        28       130        60
OIR    2025250     91400   17.6900 -113.0100       8.6        28       130        60
OIR    2025250     91400   17.6900 -113.0200       8.6        27       130        60
OIR    2025250     91400   17.6900 -113.0300       8.6        27       131        60
OIR    2025250     91400   17.6900 -113.0400       8.7        26       131        60
OIR    2025250     91400   17.6900 -113.0500       8.7        26       132        60
OIR    2025250     91400   17.6900 -113.0600       8.7        25       132        60
OIR    2025250     91400   17.6900 -113.0700       8.6        26       131        60
OIR    2025250     91400   17.6900 -113.0800       8.6        26       131        60
OIR    2025250     91400   17.6900 -113.0900       8.4        25       131        60
OIR    2025250     91400   17.6900 -113.1000       8.3        25       132        60
OIR    2025250     91400   17.6900 -113.1100       8.1        24       132        60
OIR    2025250     91400   17.6900 -113.1200       7.6        24       132        60
OIR    2025250     91400   17.6900 -113.1300       6.9        23       133        60
OIR    2025250     91400   17.6900 -113.1400       6.1        22       133        60
OIR    2025250     91400   17.6900 -113.1500       5.1        21       133        60
OIR    2025250     91400   17.6900 -113.1600       4.2        20       134        60
OIR    2025250     91400   17.6900 -113.1700       4.0        21       134        60
OIR    2025250     91400   17.6900 -113.1800       4.0        21       137        60
OIR    2025250     91400   17.6900 -113.1900       4.0        21       140        60
OIR    2025250     91400   17.6900 -113.2000       4.1        21       141        60
OIR    2025250     91400   17.6900 -113.2100       4.2        20       143        60
OIR    2025250     91400   17.6900 -113.2200       4.4        19       142        60
OIR    2025250     91400   17.6900 -113.2300       4.7        16       140        60
OIR    2025250     91400   17.6900 -113.2400       5.2        15       141        60
OIR    2025250     91400   17.6900 -113.2500       5.8        15       143        60
OIR    2025250     91400   17.6900 -113.2900       7.4        14       144        60
OIR    2025250     91400   17.6900 -113.3000       7.5        14       140        60
OIR    2025250     91400   17.6900 -113.3100       7.7        14       138        60
OIR    2025250     91400   17.6900 -113.3200       7.9        14       136        60
OIR    2025250     91400   17.6900 -113.3300       8.2        15       136        60
OIR    2025250     91400   17.6900 -113.3400       8.5        16       136        60
OIR    2025250     91400   17.6900 -113.3500       8.8        16       136        60
OIR    2025250     91400   17.6900 -113.3600       9.1        17       135        60
OIR    2025250     91400   17.6900 -113.3700       9.5        18       134        60
OIR    2025250     91400   17.6900 -113.3800      10.0        19       137        60
OIR    2025250     91400   17.6900 -113.3900      10.6        20       140        60
OIR    2025250     91400   17.6900 -113.4000      11.0        20       141        60
OIR    2025250     91400   17.6900 -113.4100      11.0        20       139        60
OIR    2025250     91400   17.6900 -113.4200      11.1        20       136        60
OIR    2025250     91400   17.6900 -113.4300      11.1        20       138        60
OIR    2025250     91400   17.6900 -113.4400      11.1        20       139        60
OIR    2025250     91400   17.6900 -113.4500      11.1        20       138        60
OIR    2025250     91400   17.6900 -113.4600      11.1        20       137        60
OIR    2025250     91400   17.6900 -113.4700      11.1        19       138        60
OIR    2025250     91400   17.6900 -113.4800      11.1        19       138        60
OIR    2025250     91400   17.6900 -113.4900      11.0        19       140        60
OIR    2025250     91400   17.6900 -113.5000      11.0        18       142        60
OIR    2025250     91400   17.6900 -113.5100      11.0        18       144        60
OIR    2025250     91400   17.6900 -113.5200      11.0        17       142        60
OIR    2025250     91400   17.6900 -113.5300      10.9        17       141        60
OIR    2025250     91400   17.6900 -113.5400      10.6        15       139        60
OIR    2025250     91400   17.6900 -113.5500      10.4        13       138        60
OIR    2025250     91400   17.6900 -113.5600       9.8        10       139        60
OIR    2025250     91400   17.6900 -113.5700       9.4         6       141        60
OIR    2025250     91400   17.6900 -113.5800       9.3         5       142        60
OIR    2025250     91400   17.6900 -113.5900       9.0         0       139        60
OIR    2025250     91400   17.6900 -113.6000       8.8       358       137        60
OIR    2025250     91400   17.6900 -113.6100       8.6       357       137        60
OIR    2025250     91400   17.6900 -113.6200       8.4       357       137        60
OIR    2025250     91400   17.6900 -113.6300       8.4       357       137        60
OIR    2025250     91400   17.6900 -113.6400       8.3       357       138        60
OIR    2025250     91400   17.6900 -113.6500       8.3       357       139        60
OIR    2025250     91400   17.6900 -113.6600       8.3       357       141        60
OIR    2025250     91400   17.6900 -113.6700       8.2       357       144        60
OIR    2025250     91400   17.6900 -113.7500       8.2       358       144        60
OIR    2025250     91400   17.6900 -113.7600       8.2       358       143        60
OIR    2025250     91400   17.6900 -113.7700       8.1       358       143        60
OIR    2025250     91400   17.6900 -113.7800       8.0       358       142        60
OIR    2025250     91400   17.6900 -113.7900       7.9       359       142        60
OIR    2025250     91400   17.6900 -113.8000       7.9       359       141        60
OIR    2025250     91400   17.6900 -113.8100       7.9       359       140        60
OIR    2025250     91400   17.6900 -113.8200       7.8       359       139        60
OIR    2025250     91400   17.6900 -113.8300       7.8       360       139        60
OIR    2025250     91400   17.6900 -113.8400       7.8         0       138        60
OIR    2025250     91400   17.6900 -113.8500       7.8         0       138        60
OIR    2025250     91400   17.6900 -113.8600       7.8         1       135        60
OIR    2025250     91400   17.6900 -113.8700       7.8         1       132        60
OIR    2025250     91400   17.6900 -113.8800       7.9         1       129        60
OIR    2025250     91400   17.6900 -113.8900       7.9         1       127        60
OIR    2025250     91400   17.6900 -113.9000       7.9         1       128        60
OIR    2025250     91400   17.6900 -113.9100       7.9         1       130        60
OIR    2025250     91400   17.6900 -113.9200       7.9         1       133        60
OIR    2025250     91400   17.6900 -113.9300       7.8         1       138        60
OIR    2025250     91400   17.6900 -113.9400       7.8         0       142        60
OIR    2025250     91400   17.6900 -113.9500       7.8         0       142        60
OIR    2025250     91400   17.6900 -113.9600       7.7       360       140        60
OIR    2025250     91400   17.6900 -113.9700       7.7       359       139        60
OIR    2025250     91400   17.6900 -113.9800       7.6       359       137        60
OIR    2025250     91400   17.6900 -113.9900       7.6       359       137        60
OIR    2025250     91400   17.6900 -114.0000       7.6       359       137        60
OIR    2025250     91400   17.6900 -114.0100       7.6       359       138        60
OIR    2025250     91400   17.6900 -114.0200       7.6       359       142        60
OIR    2025250     91400   17.6900 -114.1300       7.7       352       144        60
OIR    2025250     91400   17.6900 -114.1400       7.6       352       141        60
OIR    2025250     91400   17.6900 -114.1500       7.6       351       139        60
OIR    2025250     91400   17.6900 -114.1600       7.6       351       139        60
OIR    2025250     91400   17.6900 -114.1700       7.7       351       138        60
OIR    2025250     91400   17.6900 -114.1800       7.7       351       138        60
OIR    2025250     91400   17.6900 -114.1900       7.6       351       138        60
OIR    2025250     91400   17.6900 -114.2000       7.6       351       142        60
OIR    2025250     91400   17.6800 -110.5600      16.2        57       144        60
OIR    2025250     91400   17.6800 -110.6100      16.0        60       140        60
OIR    2025250     91400   17.6800 -110.6200      15.8        61       133        60
OIR    2025250     91400   17.6800 -110.6300      15.6        61       129        60
OIR    2025250     91400   17.6800 -110.6400      15.2        62       128        60
OIR    2025250     91400   17.6800 -110.6500      15.1        62       128        60
OIR    2025250     91400   17.6800 -110.6600      15.1        62       126        60
OIR    2025250     91400   17.6800 -110.6700      15.0        62       124        60
OIR    2025250     91400   17.6800 -110.6800      15.0        62       122        60
OIR    2025250     91400   17.6800 -110.6900      14.9        62       121        60
OIR    2025250     91400   17.6800 -110.7000      14.9        62       119        60
OIR    2025250     91400   17.6800 -110.7100      14.8        62       120        60
OIR    2025250     91400   17.6800 -110.7200      14.8        62       122        60
OIR    2025250     91400   17.6800 -110.7300      14.7        62       126        60
OIR    2025250     91400   17.6800 -110.7400      14.7        62       132        60
OIR    2025250     91400   17.6800 -110.7500      14.7        62       135        60
OIR    2025250     91400   17.6800 -110.7600      14.7        62       135        60
OIR    2025250     91400   17.6800 -110.7700      14.7        62       135        60
OIR    2025250     91400   17.6800 -110.7800      14.7        62       135        60
OIR    2025250     91400   17.6800 -110.7900      14.7        62       135        60
OIR    2025250     91400   17.6800 -110.8000      14.6        62       137        60
OIR    2025250     91400   17.6800 -110.8100      14.6        62       140        60
OIR    2025250     91400   17.6800 -110.8200      14.5        62       144        60
OIR    2025250     91400   17.6800 -111.2800      19.5        62       143        60
OIR    2025250     91400   17.6800 -111.2900      20.2        62       138        60
OIR    2025250     91400   17.6800 -111.3000      20.2        62       123        60
OIR    2025250     91400   17.6800 -111.3100      20.3        62       108        60
OIR    2025250     91400   17.6800 -111.3200      20.3        62       103        60
OIR    2025250     91400   17.6800 -111.3300      20.3        62       103        60
OIR    2025250     91400   17.6800 -111.3400      20.2        62       103        60
OIR    2025250     91400   17.6800 -111.3500      19.8        62       103        60
OIR    2025250     91400   17.6800 -111.3600      18.3        60       103        60
OIR    2025250     91400   17.6800 -111.3700      16.8        59       103        60
OIR    2025250     91400   17.6800 -111.3800      15.9        59       103        60
OIR    2025250     91400   17.6800 -111.3900      15.6        59       103        60
OIR    2025250     91400   17.6800 -111.4000      15.5        58       103        60
OIR    2025250     91400   17.6800 -111.4100      15.5        58       103        60
OIR    2025250     91400   17.6800 -111.4200      15.5        58       103        60
OIR    2025250     91400   17.6800 -111.4300      15.4        58       103        60
OIR    2025250     91400   17.6800 -111.4400      15.4        58       103        60
OIR    2025250     91400   17.6800 -111.4500      15.4        58       103        60
OIR    2025250     91400   17.6800 -111.4600      15.4        58       103        60
OIR    2025250     91400   17.6800 -111.4700      15.4        58       103        60
OIR    2025250     91400   17.6800 -111.4800      15.3        58       103        60
OIR    2025250     91400   17.6800 -111.4900      15.2        58       103        60
OIR    2025250     91400   17.6800 -111.5000      15.0        58       103        60
OIR    2025250     91400   17.6800 -111.5100      14.6        58       104        60
OIR    2025250     91400   17.6800 -111.5200      14.2        59       107        60
OIR    2025250     91400   17.6800 -111.5300      13.2        60       109        60
OIR    2025250     91400   17.6800 -111.5400      11.2        61       112        60
OIR    2025250     91400   17.6800 -111.5500      10.8        59       115        60
OIR    2025250     91400   17.6800 -111.5600      11.5        52       122        60
OIR    2025250     91400   17.6800 -111.5700      11.8        50       128        60
OIR    2025250     91400   17.6800 -111.5800      11.6        50       139        60
OIR    2025250     91400   17.6800 -111.6700      10.0        56       141        60
OIR    2025250     91400   17.6800 -111.6800      12.4        53       138        60
OIR    2025250     91400   17.6800 -111.6900      13.8        52       136        60
OIR    2025250     91400   17.6800 -111.7000      14.4        51       136        60
OIR    2025250     91400   17.6800 -111.7100      14.9        51       135        60
OIR    2025250     91400   17.6800 -111.7200      15.0        50       139        60
OIR    2025250     91400   17.6800 -111.7300      15.1        50       143        60
OIR    2025250     91400   17.6800 -111.7700      15.1        49       144        60
OIR    2025250     91400   17.6800 -111.7800      15.1        49       139        60
OIR    2025250     91400   17.6800 -111.7900      15.1        49       141        60
OIR    2025250     91400   17.6800 -111.8000      15.1        49       143        60
OIR    2025250     91400   17.6800 -111.8100      15.1        49       144        60
OIR    2025250     91400   17.6800 -111.8200      15.1        49       143        60
OIR    2025250     91400   17.6800 -111.8300      15.1        49       143        60
OIR    2025250     91400   17.6800 -112.0700      14.6        47       144        60
OIR    2025250     91400   17.6800 -112.0800      14.6        47       137        60
OIR    2025250     91400   17.6800 -112.0900      14.6        47       134        60
OIR    2025250     91400   17.6800 -112.1000      14.6        47       139        60
OIR    2025250     91400   17.6800 -112.1100      14.6        47       143        60
OIR    2025250     91400   17.6800 -112.1200      14.6        47       143        60
OIR    2025250     91400   17.6800 -112.1300      14.6        47       143        60
OIR    2025250     91400   17.6800 -112.1400      14.6        47       140        60
OIR    2025250     91400   17.6800 -112.1500      14.6        47       136        60
OIR    2025250     91400   17.6800 -112.1600      14.6        47       133        60
OIR    2025250     91400   17.6800 -112.1700      14.6        47       134        60
OIR    2025250     91400   17.6800 -112.1800      14.6        47       135        60
OIR    2025250     91400   17.6800 -112.1900      14.6        47       135        60
OIR    2025250     91400   17.6800 -112.2000      14.6        47       135        60
OIR    2025250     91400   17.6800 -112.2100      14.6        46       132        60
OIR    2025250     91400   17.6800 -112.2200      14.5        46       130        60
OIR    2025250     91400   17.6800 -112.2300      14.3        45       128        60
OIR    2025250     91400   17.6800 -112.2400      14.2        41       127        60
OIR    2025250     91400   17.6800 -112.2500      14.1        38       125        60
OIR    2025250     91400   17.6800 -112.2600      14.0        37       126        60
OIR    2025250     91400   17.6800 -112.2700      13.9        37       127        60
OIR    2025250     91400   17.6800 -112.2800      13.9        37       128        60
OIR    2025250     91400   17.6800 -112.2900      13.9        37       129        60
OIR    2025250     91400   17.6800 -112.3000      13.8        37       130        60
OIR    2025250     91400   17.6800 -112.3100      13.7        37       132        60
OIR    2025250     91400   17.6800 -112.3200      13.0        36       133        60
OIR    2025250     91400   17.6800 -112.3300      12.7        35       133        60
OIR    2025250     91400   17.6800 -112.3400      12.5        35       133        60
OIR    2025250     91400   17.6800 -112.3500      12.2        35       133        60
OIR    2025250     91400   17.6800 -112.3600      12.0        34       132        60
OIR    2025250     91400   17.6800 -112.3700      11.9        34       132        60
OIR    2025250     91400   17.6800 -112.3800      11.8        34       133        60
OIR    2025250     91400   17.6800 -112.3900      11.8        34       132        60
OIR    2025250     91400   17.6800 -112.4000      11.7        34       130        60
OIR    2025250     91400   17.6800 -112.4100      11.7        34       129        60
OIR    2025250     91400   17.6800 -112.4200      11.7        34       128        60
OIR    2025250     91400   17.6800 -112.4300      11.7        34       128        60
OIR    2025250     91400   17.6800 -112.4400      11.7        34       127        60
OIR    2025250     91400   17.6800 -112.4500      11.6        34       127        60
OIR    2025250     91400   17.6800 -112.4600      11.6        34       126        60
OIR    2025250     91400   17.6800 -112.4700      11.6        34       126        60
OIR    2025250     91400   17.6800 -112.4800      12.0        33       126        60
OIR    2025250     91400   17.6800 -112.4900      13.0        31       127        60
OIR    2025250     91400   17.6800 -112.5000      14.1        30       128        60
OIR    2025250     91400   17.6800 -112.5100      14.2        30       128        60
OIR    2025250     91400   17.6800 -112.5200      14.0        31       127        60
OIR    2025250     91400   17.6800 -112.5300      13.4        33       128        60
OIR    2025250     91400   17.6800 -112.5400      13.1        33       128        60
OIR    2025250     91400   17.6800 -112.5500      12.9        34       128        60
OIR    2025250     91400   17.6800 -112.5600      12.9        34       129        60
OIR    2025250     91400   17.6800 -112.5700      13.0        33       130        60
OIR    2025250     91400   17.6800 -112.5800      13.1        33       131        60
OIR    2025250     91400   17.6800 -112.5900      13.2        33       134        60
OIR    2025250     91400   17.6800 -112.6000      13.2        32       135        60
OIR    2025250     91400   17.6800 -112.6100      13.3        31       136        60
OIR    2025250     91400   17.6800 -112.6200      13.4        30       137        60
OIR    2025250     91400   17.6800 -112.6300      13.6        29       136        60
OIR    2025250     91400   17.6800 -112.6400      13.9        27       136        60
OIR    2025250     91400   17.6800 -112.6500      14.8        23       137        60
OIR    2025250     91400   17.6800 -112.6600      14.9        22       139        60
OIR    2025250     91400   17.6800 -112.6700      14.9        22       138        60
OIR    2025250     91400   17.6800 -112.6800      14.7        21       135        60
OIR    2025250     91400   17.6800 -112.6900      14.4        21       134        60
OIR    2025250     91400   17.6800 -112.7000      14.0        21       134        60
OIR    2025250     91400   17.6800 -112.7100      13.6        21       135        60
OIR    2025250     91400   17.6800 -112.7200      13.1        21       134        60
OIR    2025250     91400   17.6800 -112.7300      12.5        22       134        60
OIR    2025250     91400   17.6800 -112.7400      11.4        23       132        60
OIR    2025250     91400   17.6800 -112.7500      10.4        23       130        60
OIR    2025250     91400   17.6800 -112.7600      10.0        24       128        60
OIR    2025250     91400   17.6800 -112.7700       9.8        25       129        60
OIR    2025250     91400   17.6800 -112.7800       9.7        25       129        60
OIR    2025250     91400   17.6800 -112.7900       9.7        26       131        60
OIR    2025250     91400   17.6800 -112.8000       9.7        26       132        60
OIR    2025250     91400   17.6800 -112.8100       9.7        26       135        60
OIR    2025250     91400   17.6800 -112.8200       9.7        26       137        60
OIR    2025250     91400   17.6800 -112.8300       9.7        26       138        60
OIR    2025250     91400   17.6800 -112.8400       9.7        26       138        60
OIR    2025250     91400   17.6800 -112.8500       9.7        26       139        60
OIR    2025250     91400   17.6800 -112.8600       9.6        26       136        60
OIR    2025250     91400   17.6800 -112.8700       9.5        27       134        60
OIR    2025250     91400   17.6800 -112.8800       9.5        26       132        60
OIR    2025250     91400   17.6800 -112.8900       9.6        26       131        60
OIR    2025250     91400   17.6800 -112.9000       9.5        26       131        60
OIR    2025250     91400   17.6800 -112.9100       9.3        26       130        60
OIR    2025250     91400   17.6800 -112.9200       9.2        27       131        60
OIR    2025250     91400   17.6800 -112.9300       9.2        27       132        60
OIR    2025250     91400   17.6800 -112.9400       9.1        28       133        60
OIR    2025250     91400   17.6800 -112.9500       9.1        28       133        60
OIR    2025250     91400   17.6800 -112.9600       9.1        28       134        60
OIR    2025250     91400   17.6800 -112.9700       9.1        28       133        60
OIR    2025250     91400   17.6800 -112.9800       9.1        27       131        60
OIR    2025250     91400   17.6800 -112.9900       9.1        27       130        60
OIR    2025250     91400   17.6800 -113.0000       9.1        27       129        60
OIR    2025250     91400   17.6800 -113.0100       9.0        27       129        60
OIR    2025250     91400   17.6800 -113.0200       8.8        27       130        60
OIR    2025250     91400   17.6800 -113.0300       8.8        26       131        60
OIR    2025250     91400   17.6800 -113.0400       8.8        26       131        60
OIR    2025250     91400   17.6800 -113.0500       8.8        26       131        60
OIR    2025250     91400   17.6800 -113.0600       8.8        25       131        60
OIR    2025250     91400   17.6800 -113.0700       8.7        25       132        60
OIR    2025250     91400   17.6800 -113.0800       8.7        25       132        60
OIR    2025250     91400   17.6800 -113.0900       8.6        25       131        60
OIR    2025250     91400   17.6800 -113.1000       8.4        25       130        60
OIR    2025250     91400   17.6800 -113.1100       8.3        24       130        60
OIR    2025250     91400   17.6800 -113.1200       8.2        23       130        60
OIR    2025250     91400   17.6800 -113.1300       8.0        22       130        60
OIR    2025250     91400   17.6800 -113.1400       7.7        21       131        60
OIR    2025250     91400   17.6800 -113.1500       6.7        20       131        60
OIR    2025250     91400   17.6800 -113.1600       5.4        19       131        60
OIR    2025250     91400   17.6800 -113.1700       4.3        19       132        60
OIR    2025250     91400   17.6800 -113.1800       4.0        20       134        60
OIR    2025250     91400   17.6800 -113.1900       4.1        20       137        60
OIR    2025250     91400   17.6800 -113.2000       4.2        20       138        60
OIR    2025250     91400   17.6800 -113.2100       4.4        19       139        60
OIR    2025250     91400   17.6800 -113.2200       4.6        18       140        60
OIR    2025250     91400   17.6800 -113.2300       5.0        16       141        60
OIR    2025250     91400   17.6800 -113.2400       5.5        14       141        60
OIR    2025250     91400   17.6800 -113.2500       6.1        14       142        60
OIR    2025250     91400   17.6800 -113.2600       6.5        14       142        60
OIR    2025250     91400   17.6800 -113.2700       6.9        14       143        60
OIR    2025250     91400   17.6800 -113.2800       7.3        14       143        60
OIR    2025250     91400   17.6800 -113.2900       7.5        14       142        60
OIR    2025250     91400   17.6800 -113.3000       7.6        14       140        60
OIR    2025250     91400   17.6800 -113.3100       7.8        14       139        60
OIR    2025250     91400   17.6800 -113.3200       8.1        15       139        60
OIR    2025250     91400   17.6800 -113.3300       8.5        16       138        60
OIR    2025250     91400   17.6800 -113.3400       8.8        16       137        60
OIR    2025250     91400   17.6800 -113.3500       9.2        17       136        60
OIR    2025250     91400   17.6800 -113.3600       9.5        17       136        60
OIR    2025250     91400   17.6800 -113.3700       9.8        18       136        60
OIR    2025250     91400   17.6800 -113.3800      10.2        20       137        60
OIR    2025250     91400   17.6800 -113.3900      10.7        20       140        60
OIR    2025250     91400   17.6800 -113.4000      11.0        20       141        60
OIR    2025250     91400   17.6800 -113.4100      11.1        20       139        60
OIR    2025250     91400   17.6800 -113.4200      11.1        20       137        60
OIR    2025250     91400   17.6800 -113.4300      11.1        20       139        60
OIR    2025250     91400   17.6800 -113.4400      11.1        20       141        60
OIR    2025250     91400   17.6800 -113.4500      11.1        20       141        60
OIR    2025250     91400   17.6800 -113.4600      11.1        20       139        60
OIR    2025250     91400   17.6800 -113.4700      11.1        19       139        60
OIR    2025250     91400   17.6800 -113.4800      11.1        19       141        60
OIR    2025250     91400   17.6800 -113.4900      11.1        19       143        60
OIR    2025250     91400   17.6800 -113.5000      11.1        19       144        60
OIR    2025250     91400   17.6800 -113.5200      11.0        18       143        60
OIR    2025250     91400   17.6800 -113.5300      11.0        18       141        60
OIR    2025250     91400   17.6800 -113.5400      10.9        17       139        60
OIR    2025250     91400   17.6800 -113.5500      10.7        16       138        60
OIR    2025250     91400   17.6800 -113.5600      10.4        14       138        60
OIR    2025250     91400   17.6800 -113.5700       9.9        11       142        60
OIR    2025250     91400   17.6800 -113.5900       9.6         5       143        60
OIR    2025250     91400   17.6800 -113.6000       9.2         1       141        60
OIR    2025250     91400   17.6800 -113.6100       8.9       359       141        60
OIR    2025250     91400   17.6800 -113.6200       8.6       358       141        60
OIR    2025250     91400   17.6800 -113.6300       8.5       358       143        60
OIR    2025250     91400   17.6800 -113.7300       8.3       358       144        60
OIR    2025250     91400   17.6800 -113.7400       8.3       358       142        60
OIR    2025250     91400   17.6800 -113.7500       8.3       358       143        60
OIR    2025250     91400   17.6800 -113.7600       8.2       359       143        60
OIR    2025250     91400   17.6800 -113.7700       8.2       359       144        60
OIR    2025250     91400   17.6800 -113.8200       7.9       360       143        60
OIR    2025250     91400   17.6800 -113.8300       7.9       360       140        60
OIR    2025250     91400   17.6800 -113.8400       7.8         0       140        60
OIR    2025250     91400   17.6800 -113.8500       7.8         0       140        60
OIR    2025250     91400   17.6800 -113.8600       7.9         1       139        60
OIR    2025250     91400   17.6800 -113.8700       7.9         1       136        60
OIR    2025250     91400   17.6800 -113.8800       7.9         1       134        60
OIR    2025250     91400   17.6800 -113.8900       7.9         1       132        60
OIR    2025250     91400   17.6800 -113.9000       7.9         1       131        60
OIR    2025250     91400   17.6800 -113.9100       7.9         1       132        60
OIR    2025250     91400   17.6800 -113.9200       7.9         1       133        60
OIR    2025250     91400   17.6800 -113.9300       7.9         1       137        60
OIR    2025250     91400   17.6800 -113.9400       7.9         1       141        60
OIR    2025250     91400   17.6800 -113.9500       7.8         0       141        60
OIR    2025250     91400   17.6800 -113.9600       7.8       360       139        60
OIR    2025250     91400   17.6800 -113.9700       7.8       360       137        60
OIR    2025250     91400   17.6800 -113.9800       7.7       360       137        60
OIR    2025250     91400   17.6800 -113.9900       7.7       359       137        60
OIR    2025250     91400   17.6800 -114.0000       7.7       359       137        60
OIR    2025250     91400   17.6800 -114.0100       7.7       359       137        60
OIR    2025250     91400   17.6800 -114.0200       7.7       359       141        60
OIR    2025250     91400   17.6800 -114.1500       7.7       352       143        60
OIR    2025250     91400   17.6800 -114.1600       7.7       351       141        60
OIR    2025250     91400   17.6800 -114.1700       7.7       351       140        60
OIR    2025250     91400   17.6800 -114.1800       7.7       351       140        60
OIR    2025250     91400   17.6800 -114.1900       7.7       351       141        60
OIR    2025250     91400   17.6800 -114.2000       7.7       351       144        60
OIR    2025250     91400   17.6700 -110.5600      16.1        57       141        60
OIR    2025250     91400   17.6700 -110.5700      16.1        58       144        60
OIR    2025250     91400   17.6700 -110.6000      16.0        60       140        60
OIR    2025250     91400   17.6700 -110.6100      15.8        60       135        60
OIR    2025250     91400   17.6700 -110.6200      15.6        61       131        60
OIR    2025250     91400   17.6700 -110.6300      15.4        62       128        60
OIR    2025250     91400   17.6700 -110.6400      15.2        62       126        60
OIR    2025250     91400   17.6700 -110.6500      15.1        62       124        60
OIR    2025250     91400   17.6700 -110.6600      15.1        62       122        60
OIR    2025250     91400   17.6700 -110.6700      15.0        62       121        60
OIR    2025250     91400   17.6700 -110.6800      14.9        62       119        60
OIR    2025250     91400   17.6700 -110.6900      14.9        62       119        60
OIR    2025250     91400   17.6700 -110.7000      14.8        62       117        60
OIR    2025250     91400   17.6700 -110.7100      14.8        62       121        60
OIR    2025250     91400   17.6700 -110.7200      14.7        62       126        60
OIR    2025250     91400   17.6700 -110.7300      14.7        62       130        60
OIR    2025250     91400   17.6700 -110.7400      14.7        62       133        60
OIR    2025250     91400   17.6700 -110.7500      14.7        62       136        60
OIR    2025250     91400   17.6700 -110.7600      14.7        62       135        60
OIR    2025250     91400   17.6700 -110.7700      14.7        62       133        60
OIR    2025250     91400   17.6700 -110.7800      14.7        62       134        60
OIR    2025250     91400   17.6700 -110.7900      14.6        62       135        60
OIR    2025250     91400   17.6700 -110.8000      14.4        62       136        60
OIR    2025250     91400   17.6700 -110.8100      14.2        62       138        60
OIR    2025250     91400   17.6700 -110.8200      14.1        62       141        60
OIR    2025250     91400   17.6700 -111.2600      17.1        67       140        60
OIR    2025250     91400   17.6700 -111.2700      17.6        66       138        60
OIR    2025250     91400   17.6700 -111.2800      19.5        62       137        60
OIR    2025250     91400   17.6700 -111.2900      20.2        62       136        60
OIR    2025250     91400   17.6700 -111.3000      20.3        62       127        60
OIR    2025250     91400   17.6700 -111.3100      20.3        62       112        60
OIR    2025250     91400   17.6700 -111.3200      20.3        62       103        60
OIR    2025250     91400   17.6700 -111.3300      20.3        62       103        60
OIR    2025250     91400   17.6700 -111.3400      20.3        62       103        60
OIR    2025250     91400   17.6700 -111.3500      19.9        62       103        60
OIR    2025250     91400   17.6700 -111.3600      18.2        61       103        60
OIR    2025250     91400   17.6700 -111.3700      16.6        60       103        60
OIR    2025250     91400   17.6700 -111.3800      15.9        59       103        60
OIR    2025250     91400   17.6700 -111.3900      15.6        59       103        60
OIR    2025250     91400   17.6700 -111.4000      15.5        58       103        60
OIR    2025250     91400   17.6700 -111.4100      15.5        58       103        60
OIR    2025250     91400   17.6700 -111.4200      15.5        58       103        60
OIR    2025250     91400   17.6700 -111.4300      15.5        58       103        60
OIR    2025250     91400   17.6700 -111.4400      15.4        58       103        60
OIR    2025250     91400   17.6700 -111.4500      15.4        58       103        60
OIR    2025250     91400   17.6700 -111.4600      15.4        58       103        60
OIR    2025250     91400   17.6700 -111.4700      15.4        58       103        60
OIR    2025250     91400   17.6700 -111.4800      15.3        57       103        60
OIR    2025250     91400   17.6700 -111.4900      15.2        57       103        60
OIR    2025250     91400   17.6700 -111.5000      15.1        57       103        60
OIR    2025250     91400   17.6700 -111.5100      14.9        57       104        60
OIR    2025250     91400   17.6700 -111.5200      14.6        56       104        60
OIR    2025250     91400   17.6700 -111.5300      14.1        56       105        60
OIR    2025250     91400   17.6700 -111.5400      12.3        56       108        60
OIR    2025250     91400   17.6700 -111.5500      11.6        56       110        60
OIR    2025250     91400   17.6700 -111.5600      12.0        53       116        60
OIR    2025250     91400   17.6700 -111.5700      11.9        51       125        60
OIR    2025250     91400   17.6700 -111.5800      11.8        51       134        60
OIR    2025250     91400   17.6700 -111.6700       8.9        57       143        60
OIR    2025250     91400   17.6700 -111.6800      11.3        53       140        60
OIR    2025250     91400   17.6700 -111.6900      13.4        52       137        60
OIR    2025250     91400   17.6700 -111.7000      14.4        51       135        60
OIR    2025250     91400   17.6700 -111.7100      14.9        50       134        60
OIR    2025250     91400   17.6700 -111.7200      15.1        50       136        60
OIR    2025250     91400   17.6700 -111.7300      15.1        50       141        60
OIR    2025250     91400   17.6700 -111.7700      15.1        49       144        60
OIR    2025250     91400   17.6700 -111.7800      15.1        49       140        60
OIR    2025250     91400   17.6700 -111.7900      15.1        49       139        60
OIR    2025250     91400   17.6700 -111.8000      15.1        49       142        60
OIR    2025250     91400   17.6700 -111.8100      15.1        49       143        60
OIR    2025250     91400   17.6700 -111.8200      15.1        49       142        60
OIR    2025250     91400   17.6700 -111.8300      15.1        49       141        60
OIR    2025250     91400   17.6700 -111.8400      15.1        48       144        60
OIR    2025250     91400   17.6700 -112.0800      14.6        47       143        60
OIR    2025250     91400   17.6700 -112.0900      14.6        47       141        60
OIR    2025250     91400   17.6700 -112.1000      14.6        47       142        60
OIR    2025250     91400   17.6700 -112.1100      14.6        47       144        60
OIR    2025250     91400   17.6700 -112.1200      14.6        47       144        60
OIR    2025250     91400   17.6700 -112.1300      14.6        47       144        60
OIR    2025250     91400   17.6700 -112.1400      14.6        47       142        60
OIR    2025250     91400   17.6700 -112.1500      14.6        47       139        60
OIR    2025250     91400   17.6700 -112.1600      14.6        47       137        60
OIR    2025250     91400   17.6700 -112.1700      14.6        47       136        60
OIR    2025250     91400   17.6700 -112.1800      14.6        47       135        60
OIR    2025250     91400   17.6700 -112.1900      14.6        47       135        60
OIR    2025250     91400   17.6700 -112.2000      14.6        46       134        60
OIR    2025250     91400   17.6700 -112.2100      14.5        46       133        60
OIR    2025250     91400   17.6700 -112.2200      14.3        45       130        60
OIR    2025250     91400   17.6700 -112.2300      14.0        42       128        60
OIR    2025250     91400   17.6700 -112.2400      14.0        39       127        60
OIR    2025250     91400   17.6700 -112.2500      14.0        37       125        60
OIR    2025250     91400   17.6700 -112.2600      14.0        37       125        60
OIR    2025250     91400   17.6700 -112.2700      14.0        37       126        60
OIR    2025250     91400   17.6700 -112.2800      13.9        37       127        60
OIR    2025250     91400   17.6700 -112.2900      13.9        37       128        60
OIR    2025250     91400   17.6700 -112.3000      13.9        37       129        60
OIR    2025250     91400   17.6700 -112.3100      13.8        37       131        60
OIR    2025250     91400   17.6700 -112.3200      13.5        36       132        60
OIR    2025250     91400   17.6700 -112.3300      13.1        35       133        60
OIR    2025250     91400   17.6700 -112.3400      12.8        35       134        60
OIR    2025250     91400   17.6700 -112.3500      12.5        34       134        60
OIR    2025250     91400   17.6700 -112.3600      12.2        34       134        60
OIR    2025250     91400   17.6700 -112.3700      12.0        34       134        60
OIR    2025250     91400   17.6700 -112.3800      11.8        34       134        60
OIR    2025250     91400   17.6700 -112.3900      11.8        34       134        60
OIR    2025250     91400   17.6700 -112.4000      11.8        34       133        60
OIR    2025250     91400   17.6700 -112.4100      11.8        34       131        60
OIR    2025250     91400   17.6700 -112.4200      11.8        33       130        60
OIR    2025250     91400   17.6700 -112.4300      11.8        33       130        60
OIR    2025250     91400   17.6700 -112.4400      12.0        33       129        60
OIR    2025250     91400   17.6700 -112.4500      12.4        31       129        60
OIR    2025250     91400   17.6700 -112.4600      13.1        29       129        60
OIR    2025250     91400   17.6700 -112.4700      13.9        27       128        60
OIR    2025250     91400   17.6700 -112.4800      14.4        27       126        60
OIR    2025250     91400   17.6700 -112.4900      14.9        27       127        60
OIR    2025250     91400   17.6700 -112.5000      15.2        27       128        60
OIR    2025250     91400   17.6700 -112.5100      15.4        27       129        60
OIR    2025250     91400   17.6700 -112.5200      15.5        26       130        60
OIR    2025250     91400   17.6700 -112.5300      15.5        26       131        60
OIR    2025250     91400   17.6700 -112.5400      15.5        26       132        60
OIR    2025250     91400   17.6700 -112.5500      15.6        26       134        60
OIR    2025250     91400   17.6700 -112.5600      15.7        26       135        60
OIR    2025250     91400   17.6700 -112.5700      15.4        26       137        60
OIR    2025250     91400   17.6700 -112.5800      15.4        26       139        60
OIR    2025250     91400   17.6700 -112.5900      14.9        27       140        60
OIR    2025250     91400   17.6700 -112.6000      14.5        28       140        60
OIR    2025250     91400   17.6700 -112.6100      14.4        28       140        60
OIR    2025250     91400   17.6700 -112.6200      14.3        27       139        60
OIR    2025250     91400   17.6700 -112.6300      14.5        26       141        60
OIR    2025250     91400   17.6700 -112.6400      15.0        23       142        60
OIR    2025250     91400   17.6700 -112.6500      15.1        22       142        60
OIR    2025250     91400   17.6700 -112.6600      15.0        22       142        60
OIR    2025250     91400   17.6700 -112.6700      15.0        22       142        60
OIR    2025250     91400   17.6700 -112.6800      14.8        21       138        60
OIR    2025250     91400   17.6700 -112.6900      14.7        21       134        60
OIR    2025250     91400   17.6700 -112.7000      14.4        21       134        60
OIR    2025250     91400   17.6700 -112.7100      14.1        21       134        60
OIR    2025250     91400   17.6700 -112.7200      13.8        22       134        60
OIR    2025250     91400   17.6700 -112.7300      13.5        22       134        60
OIR    2025250     91400   17.6700 -112.7400      12.9        22       134        60
OIR    2025250     91400   17.6700 -112.7500      11.8        22       132        60
OIR    2025250     91400   17.6700 -112.7600      10.7        24       131        60
OIR    2025250     91400   17.6700 -112.7700      10.2        25       132        60
OIR    2025250     91400   17.6700 -112.7800       9.9        25       132        60
OIR    2025250     91400   17.6700 -112.7900       9.8        26       132        60
OIR    2025250     91400   17.6700 -112.8000       9.8        26       133        60
OIR    2025250     91400   17.6700 -112.8100       9.7        26       135        60
OIR    2025250     91400   17.6700 -112.8200       9.7        26       138        60
OIR    2025250     91400   17.6700 -112.8300       9.7        26       140        60
OIR    2025250     91400   17.6700 -112.8400       9.7        26       140        60
OIR    2025250     91400   17.6700 -112.8500       9.7        26       140        60
OIR    2025250     91400   17.6700 -112.8600       9.7        26       139        60
OIR    2025250     91400   17.6700 -112.8700       9.7        26       137        60
OIR    2025250     91400   17.6700 -112.8800       9.7        26       135        60
OIR    2025250     91400   17.6700 -112.8900       9.6        26       132        60
OIR    2025250     91400   17.6700 -112.9000       9.6        26       130        60
OIR    2025250     91400   17.6700 -112.9100       9.4        26       130        60
OIR    2025250     91400   17.6700 -112.9200       9.3        27       130        60
OIR    2025250     91400   17.6700 -112.9300       9.2        27       131        60
OIR    2025250     91400   17.6700 -112.9400       9.2        27       132        60
OIR    2025250     91400   17.6700 -112.9500       9.2        28       132        60
OIR    2025250     91400   17.6700 -112.9600       9.2        28       131        60
OIR    2025250     91400   17.6700 -112.9700       9.2        27       130        60
OIR    2025250     91400   17.6700 -112.9800       9.2        27       128        60
OIR    2025250     91400   17.6700 -112.9900       9.2        27       126        60
OIR    2025250     91400   17.6700 -113.0000       9.2        27       127        60
OIR    2025250     91400   17.6700 -113.0100       9.1        27       128        60
OIR    2025250     91400   17.6700 -113.0200       9.1        27       129        60
OIR    2025250     91400   17.6700 -113.0300       9.1        26       130        60
OIR    2025250     91400   17.6700 -113.0400       9.0        26       130        60
OIR    2025250     91400   17.6700 -113.0500       8.9        25       130        60
OIR    2025250     91400   17.6700 -113.0600       8.9        25       130        60
OIR    2025250     91400   17.6700 -113.0700       8.8        25       131        60
OIR    2025250     91400   17.6700 -113.0800       8.8        25       132        60
OIR    2025250     91400   17.6700 -113.0900       8.7        25       131        60
OIR    2025250     91400   17.6700 -113.1000       8.6        25       130        60
OIR    2025250     91400   17.6700 -113.1100       8.5        24       129        60
OIR    2025250     91400   17.6700 -113.1200       8.3        23       128        60
OIR    2025250     91400   17.6700 -113.1300       8.2        22       128        60
OIR    2025250     91400   17.6700 -113.1400       8.1        21       129        60
OIR    2025250     91400   17.6700 -113.1500       7.9        19       129        60
OIR    2025250     91400   17.6700 -113.1600       7.6        17       130        60
OIR    2025250     91400   17.6700 -113.1700       7.1        16       130        60
OIR    2025250     91400   17.6700 -113.1800       6.1        18       132        60
OIR    2025250     91400   17.6700 -113.1900       4.8        17       134        60
OIR    2025250     91400   17.6700 -113.2000       4.3        19       136        60
OIR    2025250     91400   17.6700 -113.2100       4.6        18       136        60
OIR    2025250     91400   17.6700 -113.2200       5.1        17       137        60
OIR    2025250     91400   17.6700 -113.2300       5.5        15       140        60
OIR    2025250     91400   17.6700 -113.2400       6.0        14       143        60
OIR    2025250     91400   17.6700 -113.2500       6.5        14       141        60
OIR    2025250     91400   17.6700 -113.2600       6.8        14       139        60
OIR    2025250     91400   17.6700 -113.2700       7.2        14       139        60
OIR    2025250     91400   17.6700 -113.2800       7.4        14       140        60
OIR    2025250     91400   17.6700 -113.2900       7.6        14       140        60
OIR    2025250     91400   17.6700 -113.3000       7.7        14       139        60
OIR    2025250     91400   17.6700 -113.3100       7.9        15       139        60
OIR    2025250     91400   17.6700 -113.3200       8.4        16       139        60
OIR    2025250     91400   17.6700 -113.3300       8.8        17       140        60
OIR    2025250     91400   17.6700 -113.3400       9.2        17       139        60
OIR    2025250     91400   17.6700 -113.3500       9.5        17       137        60
OIR    2025250     91400   17.6700 -113.3600       9.7        18       137        60
OIR    2025250     91400   17.6700 -113.3700      10.0        19       139        60
OIR    2025250     91400   17.6700 -113.3800      10.4        20       140        60
OIR    2025250     91400   17.6700 -113.3900      10.8        20       140        60
OIR    2025250     91400   17.6700 -113.4000      11.0        20       141        60
OIR    2025250     91400   17.6700 -113.4100      11.1        20       141        60
OIR    2025250     91400   17.6700 -113.4200      11.1        20       141        60
OIR    2025250     91400   17.6700 -113.4300      11.1        20       141        60
OIR    2025250     91400   17.6700 -113.4400      11.1        20       142        60
OIR    2025250     91400   17.6700 -113.4500      11.1        20       142        60
OIR    2025250     91400   17.6700 -113.4600      11.1        20       139        60
OIR    2025250     91400   17.6700 -113.4700      11.1        20       137        60
OIR    2025250     91400   17.6700 -113.4800      11.1        19       140        60
OIR    2025250     91400   17.6700 -113.4900      11.1        19       144        60
OIR    2025250     91400   17.6700 -113.5000      11.1        19       143        60
OIR    2025250     91400   17.6700 -113.5100      11.1        19       143        60
OIR    2025250     91400   17.6700 -113.5200      11.1        18       142        60
OIR    2025250     91400   17.6700 -113.5300      11.1        18       141        60
OIR    2025250     91400   17.6700 -113.5400      11.0        18       140        60
OIR    2025250     91400   17.6700 -113.5500      11.0        17       141        60
OIR    2025250     91400   17.6700 -113.5600      10.9        17       142        60
OIR    2025250     91400   17.6700 -113.5700      10.6        15       144        60
OIR    2025250     91400   17.6700 -113.6000       9.9         7       141        60
OIR    2025250     91400   17.6700 -113.6100       9.3         3       140        60
OIR    2025250     91400   17.6700 -113.6200       8.7       359       140        60
OIR    2025250     91400   17.6700 -113.6300       8.5       359       142        60
OIR    2025250     91400   17.6700 -113.7300       8.3       359       144        60
OIR    2025250     91400   17.6700 -113.7400       8.3       359       140        60
OIR    2025250     91400   17.6700 -113.7500       8.3       359       141        60
OIR    2025250     91400   17.6700 -113.7600       8.3       359       143        60
OIR    2025250     91400   17.6700 -113.8300       7.9       360       143        60
OIR    2025250     91400   17.6700 -113.8400       7.9         0       142        60
OIR    2025250     91400   17.6700 -113.8500       7.9         0       142        60
OIR    2025250     91400   17.6700 -113.8600       7.9         1       142        60
OIR    2025250     91400   17.6700 -113.8700       7.9         1       140        60
OIR    2025250     91400   17.6700 -113.8800       7.9         1       138        60
OIR    2025250     91400   17.6700 -113.8900       7.9         1       136        60
OIR    2025250     91400   17.6700 -113.9000       7.9         1       135        60
OIR    2025250     91400   17.6700 -113.9100       7.9         1       134        60
OIR    2025250     91400   17.6700 -113.9200       7.9         1       133        60
OIR    2025250     91400   17.6700 -113.9300       7.9         1       136        60
OIR    2025250     91400   17.6700 -113.9400       7.9         1       140        60
OIR    2025250     91400   17.6700 -113.9500       7.9         0       140        60
OIR    2025250     91400   17.6700 -113.9600       7.9         0       137        60
OIR    2025250     91400   17.6700 -113.9700       7.8       360       134        60
OIR    2025250     91400   17.6700 -113.9800       7.8       360       136        60
OIR    2025250     91400   17.6700 -113.9900       7.8       359       137        60
OIR    2025250     91400   17.6700 -114.0000       7.7       359       137        60
OIR    2025250     91400   17.6700 -114.0100       7.7       359       137        60
OIR    2025250     91400   17.6700 -114.0200       7.7       359       139        60
OIR    2025250     91400   17.6700 -114.1700       7.7       351       142        60
OIR    2025250     91400   17.6700 -114.1800       7.7       351       142        60
OIR    2025250     91400   17.6700 -114.1900       7.7       351       144        60
OIR    2025250     91400   17.6600 -110.5600      16.0        56       140        60
OIR    2025250     91400   17.6600 -110.5700      16.0        58       140        60
OIR    2025250     91400   17.6600 -110.5800      16.0        58       142        60
OIR    2025250     91400   17.6600 -110.5900      15.9        59       141        60
OIR    2025250     91400   17.6600 -110.6000      15.8        59       137        60
OIR    2025250     91400   17.6600 -110.6100      15.7        60       132        60
OIR    2025250     91400   17.6600 -110.6200      15.5        61       129        60
OIR    2025250     91400   17.6600 -110.6300      15.3        62       127        60
OIR    2025250     91400   17.6600 -110.6400      15.1        62       124        60
OIR    2025250     91400   17.6600 -110.6500      15.1        62       122        60
OIR    2025250     91400   17.6600 -110.6600      15.0        62       120        60
OIR    2025250     91400   17.6600 -110.6700      15.0        62       119        60
OIR    2025250     91400   17.6600 -110.6800      14.9        62       116        60
OIR    2025250     91400   17.6600 -110.6900      14.8        62       117        60
OIR    2025250     91400   17.6600 -110.7000      14.7        62       117        60
OIR    2025250     91400   17.6600 -110.7100      14.7        62       122        60
OIR    2025250     91400   17.6600 -110.7200      14.7        62       128        60
OIR    2025250     91400   17.6600 -110.7300      14.7        62       133        60
OIR    2025250     91400   17.6600 -110.7400      14.7        62       135        60
OIR    2025250     91400   17.6600 -110.7500      14.7        62       136        60
OIR    2025250     91400   17.6600 -110.7600      14.7        62       135        60
OIR    2025250     91400   17.6600 -110.7700      14.7        62       132        60
OIR    2025250     91400   17.6600 -110.7800      14.6        62       132        60
OIR    2025250     91400   17.6600 -110.7900      14.6        62       134        60
OIR    2025250     91400   17.6600 -110.8000      14.1        62       135        60
OIR    2025250     91400   17.6600 -110.8100      14.0        62       137        60
OIR    2025250     91400   17.6600 -110.8200      13.9        62       139        60
OIR    2025250     91400   17.6600 -110.8300      13.8        63       142        60
OIR    2025250     91400   17.6600 -111.2600      17.2        67       141        60
OIR    2025250     91400   17.6600 -111.2700      17.8        66       138        60
OIR    2025250     91400   17.6600 -111.2800      19.3        63       137        60
OIR    2025250     91400   17.6600 -111.2900      20.3        62       135        60
OIR    2025250     91400   17.6600 -111.3000      20.3        62       130        60
OIR    2025250     91400   17.6600 -111.3100      20.3        62       115        60
OIR    2025250     91400   17.6600 -111.3200      20.4        62       103        60
OIR    2025250     91400   17.6600 -111.3300      20.3        62       103        60
OIR    2025250     91400   17.6600 -111.3400      20.3        62       103        60
OIR    2025250     91400   17.6600 -111.3500      19.8        62       103        60
OIR    2025250     91400   17.6600 -111.3600      17.8        61       103        60
OIR    2025250     91400   17.6600 -111.3700      16.4        60       103        60
OIR    2025250     91400   17.6600 -111.3800      15.9        60       103        60
OIR    2025250     91400   17.6600 -111.3900      15.7        59       103        60
OIR    2025250     91400   17.6600 -111.4000      15.6        59       103        60
OIR    2025250     91400   17.6600 -111.4100      15.5        58       103        60
OIR    2025250     91400   17.6600 -111.4200      15.5        58       103        60
OIR    2025250     91400   17.6600 -111.4300      15.5        58       103        60
OIR    2025250     91400   17.6600 -111.4400      15.5        58       103        60
OIR    2025250     91400   17.6600 -111.4500      15.4        58       103        60
OIR    2025250     91400   17.6600 -111.4600      15.4        58       103        60
OIR    2025250     91400   17.6600 -111.4700      15.4        57       103        60
OIR    2025250     91400   17.6600 -111.4800      15.4        57       103        60
OIR    2025250     91400   17.6600 -111.4900      15.3        57       103        60
OIR    2025250     91400   17.6600 -111.5000      15.1        57       103        60
OIR    2025250     91400   17.6600 -111.5100      14.9        56       103        60
OIR    2025250     91400   17.6600 -111.5200      14.7        55       103        60
OIR    2025250     91400   17.6600 -111.5300      14.4        53       103        60
OIR    2025250     91400   17.6600 -111.5400      14.0        51       104        60
OIR    2025250     91400   17.6600 -111.5500      13.5        50       104        60
OIR    2025250     91400   17.6600 -111.5600      12.3        50       113        60
OIR    2025250     91400   17.6600 -111.5700      12.0        51       124        60
OIR    2025250     91400   17.6600 -111.5800      11.8        52       133        60
OIR    2025250     91400   17.6600 -111.5900      11.2        53       142        60
OIR    2025250     91400   17.6600 -111.6800      10.5        50       143        60
OIR    2025250     91400   17.6600 -111.6900      12.9        49       138        60
OIR    2025250     91400   17.6600 -111.7000      14.2        50       135        60
OIR    2025250     91400   17.6600 -111.7100      14.9        50       134        60
OIR    2025250     91400   17.6600 -111.7200      15.1        50       134        60
OIR    2025250     91400   17.6600 -111.7300      15.1        50       139        60
OIR    2025250     91400   17.6600 -111.7400      15.2        49       143        60
OIR    2025250     91400   17.6600 -111.7500      15.2        49       144        60
OIR    2025250     91400   17.6600 -111.7800      15.2        49       143        60
OIR    2025250     91400   17.6600 -111.7900      15.1        49       142        60
OIR    2025250     91400   17.6600 -111.8000      15.1        49       143        60
OIR    2025250     91400   17.6600 -111.8100      15.1        49       144        60
OIR    2025250     91400   17.6600 -111.8200      15.1        48       144        60
OIR    2025250     91400   17.6600 -111.8300      15.1        48       144        60
OIR    2025250     91400   17.6600 -112.1300      14.6        47       144        60
OIR    2025250     91400   17.6600 -112.1400      14.6        47       143        60
OIR    2025250     91400   17.6600 -112.1500      14.6        47       142        60
OIR    2025250     91400   17.6600 -112.1600      14.6        47       140        60
OIR    2025250     91400   17.6600 -112.1700      14.6        46       138        60
OIR    2025250     91400   17.6600 -112.1800      14.6        46       137        60
OIR    2025250     91400   17.6600 -112.1900      14.6        46       135        60
OIR    2025250     91400   17.6600 -112.2000      14.6        46       134        60
OIR    2025250     91400   17.6600 -112.2100      14.4        44       133        60
OIR    2025250     91400   17.6600 -112.2200      14.2        42       131        60
OIR    2025250     91400   17.6600 -112.2300      14.1        39       129        60
OIR    2025250     91400   17.6600 -112.2400      13.9        38       128        60
OIR    2025250     91400   17.6600 -112.2500      14.0        37       126        60
OIR    2025250     91400   17.6600 -112.2600      14.0        37       126        60
OIR    2025250     91400   17.6600 -112.2700      14.0        37       125        60
OIR    2025250     91400   17.6600 -112.2800      13.9        37       125        60
OIR    2025250     91400   17.6600 -112.2900      13.9        37       126        60
OIR    2025250     91400   17.6600 -112.3000      13.9        37       127        60
OIR    2025250     91400   17.6600 -112.3100      13.9        36       128        60
OIR    2025250     91400   17.6600 -112.3200      13.7        36       130        60
OIR    2025250     91400   17.6600 -112.3300      13.4        35       132        60
OIR    2025250     91400   17.6600 -112.3400      13.2        34       134        60
OIR    2025250     91400   17.6600 -112.3500      12.9        34       135        60
OIR    2025250     91400   17.6600 -112.3600      12.6        33       136        60
OIR    2025250     91400   17.6600 -112.3700      12.3        33       136        60
OIR    2025250     91400   17.6600 -112.3800      12.0        33       135        60
OIR    2025250     91400   17.6600 -112.3900      11.8        33       134        60
OIR    2025250     91400   17.6600 -112.4000      11.9        33       134        60
OIR    2025250     91400   17.6600 -112.4100      12.1        32       133        60
OIR    2025250     91400   17.6600 -112.4200      12.4        31       132        60
OIR    2025250     91400   17.6600 -112.4300      12.9        30       131        60
OIR    2025250     91400   17.6600 -112.4400      13.6        28       130        60
OIR    2025250     91400   17.6600 -112.4500      14.5        26       129        60
OIR    2025250     91400   17.6600 -112.4600      15.1        25       128        60
OIR    2025250     91400   17.6600 -112.4700      15.5        25       127        60
OIR    2025250     91400   17.6600 -112.4800      15.7        25       126        60
OIR    2025250     91400   17.6600 -112.4900      15.7        25       127        60
OIR    2025250     91400   17.6600 -112.5000      15.7        25       128        60
OIR    2025250     91400   17.6600 -112.5100      15.8        25       130        60
OIR    2025250     91400   17.6600 -112.5200      15.8        25       130        60
OIR    2025250     91400   17.6600 -112.5300      15.8        25       131        60
OIR    2025250     91400   17.6600 -112.5400      15.8        25       132        60
OIR    2025250     91400   17.6600 -112.5500      15.8        25       132        60
OIR    2025250     91400   17.6600 -112.5600      15.8        25       133        60
OIR    2025250     91400   17.6600 -112.5700      15.8        25       135        60
OIR    2025250     91400   17.6600 -112.5800      15.7        25       136        60
OIR    2025250     91400   17.6600 -112.5900      15.7        25       138        60
OIR    2025250     91400   17.6600 -112.6000      15.6        25       140        60
OIR    2025250     91400   17.6600 -112.6100      15.4        24       141        60
OIR    2025250     91400   17.6600 -112.6200      15.3        24       142        60
OIR    2025250     91400   17.6600 -112.6300      15.3        23       143        60
OIR    2025250     91400   17.6600 -112.6400      15.2        22       144        60
OIR    2025250     91400   17.6600 -112.6500      15.1        22       144        60
OIR    2025250     91400   17.6600 -112.6600      15.1        22       143        60
OIR    2025250     91400   17.6600 -112.6700      15.0        22       141        60
OIR    2025250     91400   17.6600 -112.6800      14.9        22       138        60
OIR    2025250     91400   17.6600 -112.6900      14.8        22       135        60
OIR    2025250     91400   17.6600 -112.7000      14.6        22       134        60
OIR    2025250     91400   17.6600 -112.7100      14.3        22       133        60
OIR    2025250     91400   17.6600 -112.7200      14.1        22       134        60
OIR    2025250     91400   17.6600 -112.7300      13.9        22       134        60
OIR    2025250     91400   17.6600 -112.7400      13.5        22       135        60
OIR    2025250     91400   17.6600 -112.7500      12.9        23       134        60
OIR    2025250     91400   17.6600 -112.7600      11.9        24       134        60
OIR    2025250     91400   17.6600 -112.7700      11.1        25       134        60
OIR    2025250     91400   17.6600 -112.7800      10.5        25       134        60
OIR    2025250     91400   17.6600 -112.7900      10.2        25       134        60
OIR    2025250     91400   17.6600 -112.8000      10.0        26       134        60
OIR    2025250     91400   17.6600 -112.8100       9.8        26       135        60
OIR    2025250     91400   17.6600 -112.8200       9.8        26       139        60
OIR    2025250     91400   17.6600 -112.8300       9.8        26       142        60
OIR    2025250     91400   17.6600 -112.8400       9.7        26       142        60
OIR    2025250     91400   17.6600 -112.8500       9.7        26       142        60
OIR    2025250     91400   17.6600 -112.8600       9.7        26       141        60
OIR    2025250     91400   17.6600 -112.8700       9.7        26       140        60
OIR    2025250     91400   17.6600 -112.8800       9.7        26       138        60
OIR    2025250     91400   17.6600 -112.8900       9.7        26       134        60
OIR    2025250     91400   17.6600 -112.9000       9.7        26       130        60
OIR    2025250     91400   17.6600 -112.9100       9.6        26       130        60
OIR    2025250     91400   17.6600 -112.9200       9.4        27       130        60
OIR    2025250     91400   17.6600 -112.9300       9.3        27       130        60
OIR    2025250     91400   17.6600 -112.9400       9.3        27       130        60
OIR    2025250     91400   17.6600 -112.9500       9.2        27       130        60
OIR    2025250     91400   17.6600 -112.9600       9.2        27       128        60
OIR    2025250     91400   17.6600 -112.9700       9.4        27       126        60
OIR    2025250     91400   17.6600 -112.9800       9.7        25       124        60
OIR    2025250     91400   17.6600 -112.9900       9.6        25       121        60
OIR    2025250     91400   17.6600 -113.0000       9.5        25       123        60
OIR    2025250     91400   17.6600 -113.0100       9.4        26       126        60
OIR    2025250     91400   17.6600 -113.0200       9.3        26       128        60
OIR    2025250     91400   17.6600 -113.0300       9.3        26       129        60
OIR    2025250     91400   17.6600 -113.0400       9.2        25       129        60
OIR    2025250     91400   17.6600 -113.0500       9.1        25       128        60
OIR    2025250     91400   17.6600 -113.0600       9.0        25       128        60
OIR    2025250     91400   17.6600 -113.0700       8.9        25       129        60
OIR    2025250     91400   17.6600 -113.0800       8.8        25       130        60
OIR    2025250     91400   17.6600 -113.0900       8.8        25       130        60
OIR    2025250     91400   17.6600 -113.1000       8.7        24       130        60
OIR    2025250     91400   17.6600 -113.1100       8.6        24       129        60
OIR    2025250     91400   17.6600 -113.1200       8.5        23       127        60
OIR    2025250     91400   17.6600 -113.1300       8.4        21       126        60
OIR    2025250     91400   17.6600 -113.1400       8.3        20       128        60
OIR    2025250     91400   17.6600 -113.1500       8.3        18       130        60
OIR    2025250     91400   17.6600 -113.1600       8.4        17       131        60
OIR    2025250     91400   17.6600 -113.1700       8.4        16       133        60
OIR    2025250     91400   17.6600 -113.1800       8.5        16       133        60
OIR    2025250     91400   17.6600 -113.1900       8.5        15       134        60
OIR    2025250     91400   17.6600 -113.2000       8.1        15       135        60
OIR    2025250     91400   17.6600 -113.2100       6.8        15       136        60
OIR    2025250     91400   17.6600 -113.2200       6.6        15       137        60
OIR    2025250     91400   17.6600 -113.2300       6.9        15       138        60
OIR    2025250     91400   17.6600 -113.2400       7.4        13       140        60
OIR    2025250     91400   17.6600 -113.2500       7.7        14       140        60
OIR    2025250     91400   17.6600 -113.2600       7.8        14       140        60
OIR    2025250     91400   17.6600 -113.2700       7.9        14       139        60
OIR    2025250     91400   17.6600 -113.2800       8.1        15       139        60
OIR    2025250     91400   17.6600 -113.2900       8.6        15       138        60
OIR    2025250     91400   17.6600 -113.3000       9.0        15       138        60
OIR    2025250     91400   17.6600 -113.3100       9.3        16       138        60
OIR    2025250     91400   17.6600 -113.3200       9.4        16       139        60
OIR    2025250     91400   17.6600 -113.3300       9.5        17       141        60
OIR    2025250     91400   17.6600 -113.3400       9.7        18       140        60
OIR    2025250     91400   17.6600 -113.3500       9.9        18       138        60
OIR    2025250     91400   17.6600 -113.3600      10.1        18       137        60
OIR    2025250     91400   17.6600 -113.3700      10.5        19       139        60
OIR    2025250     91400   17.6600 -113.3800      10.8        20       141        60
OIR    2025250     91400   17.6600 -113.3900      11.0        20       141        60
OIR    2025250     91400   17.6600 -113.4000      11.1        20       140        60
OIR    2025250     91400   17.6600 -113.4100      11.1        20       142        60
OIR    2025250     91400   17.6600 -113.4200      11.1        20       143        60
OIR    2025250     91400   17.6600 -113.4300      11.1        20       143        60
OIR    2025250     91400   17.6600 -113.4400      11.1        20       144        60
OIR    2025250     91400   17.6600 -113.4500      11.1        20       143        60
OIR    2025250     91400   17.6600 -113.4600      11.1        20       140        60
OIR    2025250     91400   17.6600 -113.4700      11.1        20       137        60
OIR    2025250     91400   17.6600 -113.4800      11.1        20       140        60
OIR    2025250     91400   17.6600 -113.4900      11.1        19       144        60
OIR    2025250     91400   17.6600 -113.5100      11.1        19       143        60
OIR    2025250     91400   17.6600 -113.5200      11.1        19       142        60
OIR    2025250     91400   17.6600 -113.5300      11.1        18       142        60
OIR    2025250     91400   17.6600 -113.5400      11.1        18       142        60
OIR    2025250     91400   17.6600 -113.5500      11.1        18       143        60
OIR    2025250     91400   17.6600 -113.5600      11.0        17       144        60
OIR    2025250     91400   17.6600 -113.6000      10.4        13       143        60
OIR    2025250     91400   17.6600 -113.6100      10.0        10       139        60
OIR    2025250     91400   17.6600 -113.6200       9.5         8       139        60
OIR    2025250     91400   17.6600 -113.6300       8.8         4       139        60
OIR    2025250     91400   17.6600 -113.6400       8.8         4       143        60
OIR    2025250     91400   17.6600 -113.7300       8.4       359       144        60
OIR    2025250     91400   17.6600 -113.7400       8.4       359       140        60
OIR    2025250     91400   17.6600 -113.7500       8.3       359       140        60
OIR    2025250     91400   17.6600 -113.7600       8.3       359       143        60
OIR    2025250     91400   17.6600 -113.8400       8.0         0       144        60
OIR    2025250     91400   17.6600 -113.8600       7.9         0       144        60
OIR    2025250     91400   17.6600 -113.8700       7.9         1       141        60
OIR    2025250     91400   17.6600 -113.8800       7.9         1       138        60
OIR    2025250     91400   17.6600 -113.8900       7.9         1       135        60
OIR    2025250     91400   17.6600 -113.9000       7.9         1       133        60
OIR    2025250     91400   17.6600 -113.9100       7.9         1       132        60
OIR    2025250     91400   17.6600 -113.9200       7.9         1       131        60
OIR    2025250     91400   17.6600 -113.9300       7.9         1       133        60
OIR    2025250     91400   17.6600 -113.9400       7.9         1       137        60
OIR    2025250     91400   17.6600 -113.9500       7.9         1       139        60
OIR    2025250     91400   17.6600 -113.9600       7.9         0       138        60
OIR    2025250     91400   17.6600 -113.9700       7.9         0       138        60
OIR    2025250     91400   17.6600 -113.9800       7.9       360       139        60
OIR    2025250     91400   17.6600 -113.9900       7.9       359       141        60
OIR    2025250     91400   17.6600 -114.0000       7.9       359       142        60
OIR    2025250     91400   17.6600 -114.0100       7.9       359       142        60
OIR    2025250     91400   17.6600 -114.0200       7.9       359       142        60
OIR    2025250     91400   17.6600 -114.0300       7.9       358       144        60
OIR    2025250     91400   17.6500 -110.5600      15.9        56       140        60
OIR    2025250     91400   17.6500 -110.5700      15.9        57       138        60
OIR    2025250     91400   17.6500 -110.5800      15.8        58       136        60
OIR    2025250     91400   17.6500 -110.5900      15.8        59       135        60
OIR    2025250     91400   17.6500 -110.6000      15.6        59       133        60
OIR    2025250     91400   17.6500 -110.6100      15.5        60       130        60
OIR    2025250     91400   17.6500 -110.6200      15.4        60       128        60
OIR    2025250     91400   17.6500 -110.6300      15.3        61       126        60
OIR    2025250     91400   17.6500 -110.6400      15.1        62       123        60
OIR    2025250     91400   17.6500 -110.6500      15.0        62       121        60
OIR    2025250     91400   17.6500 -110.6600      15.0        63       117        60
OIR    2025250     91400   17.6500 -110.6700      14.9        63       117        60
OIR    2025250     91400   17.6500 -110.6800      14.8        62       116        60
OIR    2025250     91400   17.6500 -110.6900      14.7        62       117        60
OIR    2025250     91400   17.6500 -110.7000      14.6        62       120        60
OIR    2025250     91400   17.6500 -110.7100      14.6        62       123        60
OIR    2025250     91400   17.6500 -110.7200      14.6        62       128        60
OIR    2025250     91400   17.6500 -110.7300      14.6        62       133        60
OIR    2025250     91400   17.6500 -110.7400      14.6        62       134        60
OIR    2025250     91400   17.6500 -110.7500      14.6        62       136        60
OIR    2025250     91400   17.6500 -110.7600      14.6        62       136        60
OIR    2025250     91400   17.6500 -110.7700      14.6        62       134        60
OIR    2025250     91400   17.6500 -110.7800      14.6        62       133        60
OIR    2025250     91400   17.6500 -110.7900      14.4        62       134        60
OIR    2025250     91400   17.6500 -110.8000      13.9        62       135        60
OIR    2025250     91400   17.6500 -110.8100      13.8        62       137        60
OIR    2025250     91400   17.6500 -110.8200      13.7        62       140        60
OIR    2025250     91400   17.6500 -110.8300      13.7        62       143        60
OIR    2025250     91400   17.6500 -111.2800      19.4        64       141        60
OIR    2025250     91400   17.6500 -111.2900      20.4        62       137        60
OIR    2025250     91400   17.6500 -111.3000      20.4        62       133        60
OIR    2025250     91400   17.6500 -111.3100      20.4        62       119        60
OIR    2025250     91400   17.6500 -111.3200      20.4        62       104        60
OIR    2025250     91400   17.6500 -111.3300      20.4        62       103        60
OIR    2025250     91400   17.6500 -111.3400      20.2        62       103        60
OIR    2025250     91400   17.6500 -111.3500      19.2        62       103        60
OIR    2025250     91400   17.6500 -111.3600      17.6        61       103        60
OIR    2025250     91400   17.6500 -111.3700      16.4        60       103        60
OIR    2025250     91400   17.6500 -111.3800      16.0        59       103        60
OIR    2025250     91400   17.6500 -111.3900      15.8        59       103        60
OIR    2025250     91400   17.6500 -111.4000      15.6        58       103        60
OIR    2025250     91400   17.6500 -111.4100      15.6        58       103        60
OIR    2025250     91400   17.6500 -111.4200      15.5        58       103        60
OIR    2025250     91400   17.6500 -111.4300      15.5        58       103        60
OIR    2025250     91400   17.6500 -111.4400      15.5        58       103        60
OIR    2025250     91400   17.6500 -111.4500      15.5        58       103        60
OIR    2025250     91400   17.6500 -111.4600      15.4        57       103        60
OIR    2025250     91400   17.6500 -111.4700      15.4        57       103        60
OIR    2025250     91400   17.6500 -111.4800      15.4        57       103        60
OIR    2025250     91400   17.6500 -111.4900      15.3        57       103        60
OIR    2025250     91400   17.6500 -111.5000      15.2        56       103        60
OIR    2025250     91400   17.6500 -111.5100      14.9        55       103        60
OIR    2025250     91400   17.6500 -111.5200      14.8        53       103        60
OIR    2025250     91400   17.6500 -111.5300      14.4        51       103        60
OIR    2025250     91400   17.6500 -111.5400      13.9        50       104        60
OIR    2025250     91400   17.6500 -111.5500      13.5        50       105        60
OIR    2025250     91400   17.6500 -111.5600      12.4        50       110        60
OIR    2025250     91400   17.6500 -111.5700      12.2        51       120        60
OIR    2025250     91400   17.6500 -111.5800      12.1        51       128        60
OIR    2025250     91400   17.6500 -111.5900      11.4        54       136        60
OIR    2025250     91400   17.6500 -111.6900      12.2        47       141        60
OIR    2025250     91400   17.6500 -111.7000      13.6        48       136        60
OIR    2025250     91400   17.6500 -111.7100      14.8        49       134        60
OIR    2025250     91400   17.6500 -111.7200      15.0        49       133        60
OIR    2025250     91400   17.6500 -111.7300      15.1        49       136        60
OIR    2025250     91400   17.6500 -111.7400      15.2        49       140        60
OIR    2025250     91400   17.6500 -111.7500      15.2        49       142        60
OIR    2025250     91400   17.6500 -111.7600      15.2        49       143        60
OIR    2025250     91400   17.6500 -111.7700      15.2        49       144        60
OIR    2025250     91400   17.6500 -111.8100      15.1        48       144        60
OIR    2025250     91400   17.6500 -111.9900      14.7        47       144        60
OIR    2025250     91400   17.6500 -112.1600      14.6        46       143        60
OIR    2025250     91400   17.6500 -112.1700      14.6        46       141        60
OIR    2025250     91400   17.6500 -112.1800      14.6        46       138        60
OIR    2025250     91400   17.6500 -112.1900      14.5        46       137        60
OIR    2025250     91400   17.6500 -112.2000      14.5        45       137        60
OIR    2025250     91400   17.6500 -112.2100      14.3        42       136        60
OIR    2025250     91400   17.6500 -112.2200      14.1        39       133        60
OIR    2025250     91400   17.6500 -112.2300      14.0        38       130        60
OIR    2025250     91400   17.6500 -112.2400      13.9        37       128        60
OIR    2025250     91400   17.6500 -112.2500      13.9        37       127        60
OIR    2025250     91400   17.6500 -112.2600      13.9        37       125        60
OIR    2025250     91400   17.6500 -112.2700      14.0        37       124        60
OIR    2025250     91400   17.6500 -112.2800      13.9        37       123        60
OIR    2025250     91400   17.6500 -112.2900      13.9        37       124        60
OIR    2025250     91400   17.6500 -112.3000      13.9        36       126        60
OIR    2025250     91400   17.6500 -112.3100      13.9        36       128        60
OIR    2025250     91400   17.6500 -112.3200      13.8        35       129        60
OIR    2025250     91400   17.6500 -112.3300      13.8        34       131        60
OIR    2025250     91400   17.6500 -112.3400      13.8        33       133        60
OIR    2025250     91400   17.6500 -112.3500      13.6        32       135        60
OIR    2025250     91400   17.6500 -112.3600      13.4        31       137        60
OIR    2025250     91400   17.6500 -112.3700      13.4        31       137        60
OIR    2025250     91400   17.6500 -112.3800      13.3        30       136        60
OIR    2025250     91400   17.6500 -112.3900      13.2        29       135        60
OIR    2025250     91400   17.6500 -112.4000      13.2        28       135        60
OIR    2025250     91400   17.6500 -112.4100      13.4        28       134        60
OIR    2025250     91400   17.6500 -112.4200      13.9        27       134        60
OIR    2025250     91400   17.6500 -112.4300      14.5        26       132        60
OIR    2025250     91400   17.6500 -112.4400      15.0        25       131        60
OIR    2025250     91400   17.6500 -112.4500      15.5        25       129        60
OIR    2025250     91400   17.6500 -112.4600      15.7        25       128        60
OIR    2025250     91400   17.6500 -112.4700      15.8        25       127        60
OIR    2025250     91400   17.6500 -112.4800      15.9        25       126        60
OIR    2025250     91400   17.6500 -112.4900      15.8        25       126        60
OIR    2025250     91400   17.6500 -112.5000      15.8        25       128        60
OIR    2025250     91400   17.6500 -112.5100      15.8        25       131        60
OIR    2025250     91400   17.6500 -112.5200      15.8        25       131        60
OIR    2025250     91400   17.6500 -112.5300      15.8        25       131        60
OIR    2025250     91400   17.6500 -112.5400      15.8        25       131        60
OIR    2025250     91400   17.6500 -112.5500      15.8        25       131        60
OIR    2025250     91400   17.6500 -112.5600      15.8        25       131        60
OIR    2025250     91400   17.6500 -112.5700      15.8        25       132        60
OIR    2025250     91400   17.6500 -112.5800      15.7        25       133        60
OIR    2025250     91400   17.6500 -112.5900      15.7        25       136        60
OIR    2025250     91400   17.6500 -112.6000      15.6        24       139        60
OIR    2025250     91400   17.6500 -112.6100      15.5        24       141        60
OIR    2025250     91400   17.6500 -112.6200      15.4        23       143        60
OIR    2025250     91400   17.6500 -112.6300      15.4        23       144        60
OIR    2025250     91400   17.6500 -112.6400      15.3        22       144        60
OIR    2025250     91400   17.6500 -112.6500      15.2        22       143        60
OIR    2025250     91400   17.6500 -112.6600      15.1        22       141        60
OIR    2025250     91400   17.6500 -112.6700      15.1        22       139        60
OIR    2025250     91400   17.6500 -112.6800      15.0        22       136        60
OIR    2025250     91400   17.6500 -112.6900      14.9        22       134        60
OIR    2025250     91400   17.6500 -112.7000      14.7        22       133        60
OIR    2025250     91400   17.6500 -112.7100      14.5        22       133        60
OIR    2025250     91400   17.6500 -112.7200      14.3        22       133        60
OIR    2025250     91400   17.6500 -112.7300      14.1        22       134        60
OIR    2025250     91400   17.6500 -112.7400      13.9        23       135        60
OIR    2025250     91400   17.6500 -112.7500      13.5        23       136        60
OIR    2025250     91400   17.6500 -112.7600      12.9        24       136        60
OIR    2025250     91400   17.6500 -112.7700      12.2        24       137        60
OIR    2025250     91400   17.6500 -112.7800      11.6        25       137        60
OIR    2025250     91400   17.6500 -112.7900      11.1        25       136        60
OIR    2025250     91400   17.6500 -112.8000      10.6        25       135        60
OIR    2025250     91400   17.6500 -112.8100      10.3        26       135        60
OIR    2025250     91400   17.6500 -112.8200      10.0        26       137        60
OIR    2025250     91400   17.6500 -112.8300       9.9        26       139        60
OIR    2025250     91400   17.6500 -112.8400       9.8        26       140        60
OIR    2025250     91400   17.6500 -112.8500       9.8        26       140        60
OIR    2025250     91400   17.6500 -112.8600       9.8        26       139        60
OIR    2025250     91400   17.6500 -112.8700       9.7        26       137        60
OIR    2025250     91400   17.6500 -112.8800       9.7        26       136        60
OIR    2025250     91400   17.6500 -112.8900       9.7        26       133        60
OIR    2025250     91400   17.6500 -112.9000       9.7        26       131        60
OIR    2025250     91400   17.6500 -112.9100       9.7        26       130        60
OIR    2025250     91400   17.6500 -112.9200       9.6        27       129        60
OIR    2025250     91400   17.6500 -112.9300       9.4        27       129        60
OIR    2025250     91400   17.6500 -112.9400       9.3        27       129        60
OIR    2025250     91400   17.6500 -112.9500       9.3        27       128        60
OIR    2025250     91400   17.6500 -112.9600       9.4        27       127        60
OIR    2025250     91400   17.6500 -112.9700       9.8        25       125        60
OIR    2025250     91400   17.6500 -112.9800      10.1        24       123        60
OIR    2025250     91400   17.6500 -112.9900      10.2        23       120        60
OIR    2025250     91400   17.6500 -113.0000      10.0        24       122        60
OIR    2025250     91400   17.6500 -113.0100       9.9        25       124        60
OIR    2025250     91400   17.6500 -113.0200       9.9        25       127        60
OIR    2025250     91400   17.6500 -113.0300       9.9        25       128        60
OIR    2025250     91400   17.6500 -113.0400       9.6        24       129        60
OIR    2025250     91400   17.6500 -113.0500       9.5        25       128        60
OIR    2025250     91400   17.6500 -113.0600       9.3        25       127        60
OIR    2025250     91400   17.6500 -113.0700       9.0        25       128        60
OIR    2025250     91400   17.6500 -113.0800       8.9        25       129        60
OIR    2025250     91400   17.6500 -113.0900       8.8        24       130        60
OIR    2025250     91400   17.6500 -113.1000       8.8        24       129        60
OIR    2025250     91400   17.6500 -113.1100       8.7        23       129        60
OIR    2025250     91400   17.6500 -113.1200       8.6        22       127        60
OIR    2025250     91400   17.6500 -113.1300       8.6        21       126        60
OIR    2025250     91400   17.6500 -113.1400       8.6        20       128        60
OIR    2025250     91400   17.6500 -113.1500       8.7        18       131        60
OIR    2025250     91400   17.6500 -113.1600       8.8        17       132        60
OIR    2025250     91400   17.6500 -113.1700       8.8        16       134        60
OIR    2025250     91400   17.6500 -113.1800       8.9        15       135        60
OIR    2025250     91400   17.6500 -113.1900       9.0        15       135        60
OIR    2025250     91400   17.6500 -113.2000       9.1        15       135        60
OIR    2025250     91400   17.6500 -113.2100       9.0        15       136        60
OIR    2025250     91400   17.6500 -113.2200       8.8        15       137        60
OIR    2025250     91400   17.6500 -113.2300       8.6        15       137        60
OIR    2025250     91400   17.6500 -113.2400       8.7        14       137        60
OIR    2025250     91400   17.6500 -113.2500       8.8        14       138        60
OIR    2025250     91400   17.6500 -113.2600       8.8        14       140        60
OIR    2025250     91400   17.6500 -113.2700       8.8        14       140        60
OIR    2025250     91400   17.6500 -113.2800       8.8        15       138        60
OIR    2025250     91400   17.6500 -113.2900       9.0        15       137        60
OIR    2025250     91400   17.6500 -113.3000       9.4        16       136        60
OIR    2025250     91400   17.6500 -113.3100       9.6        16       136        60
OIR    2025250     91400   17.6500 -113.3200       9.8        17       139        60
OIR    2025250     91400   17.6500 -113.3300       9.9        17       143        60
OIR    2025250     91400   17.6500 -113.3400      10.0        18       142        60
OIR    2025250     91400   17.6500 -113.3500      10.2        18       139        60
OIR    2025250     91400   17.6500 -113.3600      10.4        19       136        60
OIR    2025250     91400   17.6500 -113.3700      10.6        19       138        60
OIR    2025250     91400   17.6500 -113.3800      10.8        20       140        60
OIR    2025250     91400   17.6500 -113.3900      11.0        20       140        60
OIR    2025250     91400   17.6500 -113.4000      11.1        20       140        60
OIR    2025250     91400   17.6500 -113.4100      11.1        20       141        60
OIR    2025250     91400   17.6500 -113.4200      11.1        20       142        60
OIR    2025250     91400   17.6500 -113.4300      11.1        20       143        60
OIR    2025250     91400   17.6500 -113.4400      11.1        20       144        60
OIR    2025250     91400   17.6500 -113.4500      11.1        20       144        60
OIR    2025250     91400   17.6500 -113.4600      11.1        20       141        60
OIR    2025250     91400   17.6500 -113.4700      11.1        20       139        60
OIR    2025250     91400   17.6500 -113.4800      11.1        20       140        60
OIR    2025250     91400   17.6500 -113.4900      11.1        20       144        60
OIR    2025250     91400   17.6500 -113.5400      11.2        18       144        60
OIR    2025250     91400   17.6500 -113.5500      11.1        18       142        60
OIR    2025250     91400   17.6500 -113.5600      11.1        18       140        60
OIR    2025250     91400   17.6500 -113.5700      11.0        17       143        60
OIR    2025250     91400   17.6500 -113.6000      10.7        14       144        60
OIR    2025250     91400   17.6500 -113.6100      10.5        13       141        60
OIR    2025250     91400   17.6500 -113.6200      10.2        12       142        60
OIR    2025250     91400   17.6500 -113.6300      10.0        12       142        60
OIR    2025250     91400   17.6500 -113.7200       8.4       359       144        60
OIR    2025250     91400   17.6500 -113.7300       8.4       359       142        60
OIR    2025250     91400   17.6500 -113.7400       8.4       359       140        60
OIR    2025250     91400   17.6500 -113.7500       8.4       359       140        60
OIR    2025250     91400   17.6500 -113.7600       8.3       359       142        60
OIR    2025250     91400   17.6500 -113.7700       8.3       359       144        60
OIR    2025250     91400   17.6500 -113.8700       7.9         0       142        60
OIR    2025250     91400   17.6500 -113.8800       7.9         1       138        60
OIR    2025250     91400   17.6500 -113.8900       7.9         1       135        60
OIR    2025250     91400   17.6500 -113.9000       7.9         1       132        60
OIR    2025250     91400   17.6500 -113.9100       7.9         1       130        60
OIR    2025250     91400   17.6500 -113.9200       7.9         1       129        60
OIR    2025250     91400   17.6500 -113.9300       7.9         1       130        60
OIR    2025250     91400   17.6500 -113.9400       7.9         1       134        60
OIR    2025250     91400   17.6500 -113.9500       8.0         1       137        60
OIR    2025250     91400   17.6500 -113.9600       8.0         0       139        60
OIR    2025250     91400   17.6500 -113.9700       8.0         0       141        60
OIR    2025250     91400   17.6500 -113.9800       8.1         0       143        60
OIR    2025250     91400   17.6500 -114.0400       7.9       358       143        60
OIR    2025250     91400   17.6400 -110.5600      15.9        55       141        60
OIR    2025250     91400   17.6400 -110.5700      15.8        56       138        60
OIR    2025250     91400   17.6400 -110.5800      15.7        58       136        60
OIR    2025250     91400   17.6400 -110.5900      15.6        58       133        60
OIR    2025250     91400   17.6400 -110.6000      15.5        59       132        60
OIR    2025250     91400   17.6400 -110.6100      15.4        59       130        60
OIR    2025250     91400   17.6400 -110.6200      15.3        60       128        60
OIR    2025250     91400   17.6400 -110.6300      15.2        61       125        60
OIR    2025250     91400   17.6400 -110.6400      15.0        62       123        60
OIR    2025250     91400   17.6400 -110.6500      14.9        63       120        60
OIR    2025250     91400   17.6400 -110.6600      14.9        63       117        60
OIR    2025250     91400   17.6400 -110.6700      14.8        63       117        60
OIR    2025250     91400   17.6400 -110.6800      14.7        63       117        60
OIR    2025250     91400   17.6400 -110.6900      14.6        63       119        60
OIR    2025250     91400   17.6400 -110.7000      14.5        62       122        60
OIR    2025250     91400   17.6400 -110.7100      14.5        62       125        60
OIR    2025250     91400   17.6400 -110.7200      14.5        62       129        60
OIR    2025250     91400   17.6400 -110.7300      14.5        62       133        60
OIR    2025250     91400   17.6400 -110.7400      14.6        62       135        60
OIR    2025250     91400   17.6400 -110.7500      14.6        62       136        60
OIR    2025250     91400   17.6400 -110.7600      14.6        62       137        60
OIR    2025250     91400   17.6400 -110.7700      14.5        62       135        60
OIR    2025250     91400   17.6400 -110.7800      14.4        62       134        60
OIR    2025250     91400   17.6400 -110.7900      14.2        62       134        60
OIR    2025250     91400   17.6400 -110.8000      13.8        62       134        60
OIR    2025250     91400   17.6400 -110.8100      13.7        62       136        60
OIR    2025250     91400   17.6400 -110.8200      13.7        62       140        60
OIR    2025250     91400   17.6400 -110.8300      13.7        62       143        60
OIR    2025250     91400   17.6400 -111.2900      20.4        62       139        60
OIR    2025250     91400   17.6400 -111.3000      20.4        62       132        60
OIR    2025250     91400   17.6400 -111.3100      20.4        62       121        60
OIR    2025250     91400   17.6400 -111.3200      20.4        62       108        60
OIR    2025250     91400   17.6400 -111.3300      20.2        62       103        60
OIR    2025250     91400   17.6400 -111.3400      19.5        62       103        60
OIR    2025250     91400   17.6400 -111.3500      18.3        60       103        60
OIR    2025250     91400   17.6400 -111.3600      17.3        59       103        60
OIR    2025250     91400   17.6400 -111.3700      16.6        59       103        60
OIR    2025250     91400   17.6400 -111.3800      16.2        59       103        60
OIR    2025250     91400   17.6400 -111.3900      16.0        58       103        60
OIR    2025250     91400   17.6400 -111.4000      15.8        58       103        60
OIR    2025250     91400   17.6400 -111.4100      15.7        58       103        60
OIR    2025250     91400   17.6400 -111.4200      15.6        58       103        60
OIR    2025250     91400   17.6400 -111.4300      15.6        57       103        60
OIR    2025250     91400   17.6400 -111.4400      15.5        57       103        60
OIR    2025250     91400   17.6400 -111.4500      15.5        57       103        60
OIR    2025250     91400   17.6400 -111.4600      15.4        57       103        60
OIR    2025250     91400   17.6400 -111.4700      15.4        57       103        60
OIR    2025250     91400   17.6400 -111.4800      15.4        57       103        60
OIR    2025250     91400   17.6400 -111.4900      15.4        57       103        60
OIR    2025250     91400   17.6400 -111.5000      15.2        55       103        60
OIR    2025250     91400   17.6400 -111.5100      15.0        53       103        60
OIR    2025250     91400   17.6400 -111.5200      14.8        52       103        60
OIR    2025250     91400   17.6400 -111.5300      14.5        51       103        60
OIR    2025250     91400   17.6400 -111.5400      13.9        50       104        60
OIR    2025250     91400   17.6400 -111.5500      13.4        50       107        60
OIR    2025250     91400   17.6400 -111.5600      12.5        51       109        60
OIR    2025250     91400   17.6400 -111.5700      12.2        51       116        60
OIR    2025250     91400   17.6400 -111.5800      12.2        52       122        60
OIR    2025250     91400   17.6400 -111.5900      12.3        55       131        60
OIR    2025250     91400   17.6400 -111.6000      12.4        56       139        60
OIR    2025250     91400   17.6400 -111.7000      13.7        47       140        60
OIR    2025250     91400   17.6400 -111.7100      14.7        49       136        60
OIR    2025250     91400   17.6400 -111.7200      14.9        49       132        60
OIR    2025250     91400   17.6400 -111.7300      15.1        49       134        60
OIR    2025250     91400   17.6400 -111.7400      15.2        49       136        60
OIR    2025250     91400   17.6400 -111.7500      15.2        49       139        60
OIR    2025250     91400   17.6400 -111.7600      15.2        49       142        60
OIR    2025250     91400   17.6400 -111.9800      14.8        47       144        60
OIR    2025250     91400   17.6400 -111.9900      14.7        47       144        60
OIR    2025250     91400   17.6400 -112.1700      14.5        46       143        60
OIR    2025250     91400   17.6400 -112.1800      14.5        46       140        60
OIR    2025250     91400   17.6400 -112.1900      14.5        46       139        60
OIR    2025250     91400   17.6400 -112.2000      14.3        43       139        60
OIR    2025250     91400   17.6400 -112.2100      14.2        39       139        60
OIR    2025250     91400   17.6400 -112.2200      14.1        37       136        60
OIR    2025250     91400   17.6400 -112.2300      13.9        37       132        60
OIR    2025250     91400   17.6400 -112.2400      13.9        36       129        60
OIR    2025250     91400   17.6400 -112.2500      13.9        36       128        60
OIR    2025250     91400   17.6400 -112.2600      13.9        36       125        60
OIR    2025250     91400   17.6400 -112.2700      14.0        36       122        60
OIR    2025250     91400   17.6400 -112.2800      14.0        36       120        60
OIR    2025250     91400   17.6400 -112.2900      13.9        36       123        60
OIR    2025250     91400   17.6400 -112.3000      13.9        36       126        60
OIR    2025250     91400   17.6400 -112.3100      13.9        35       128        60
OIR    2025250     91400   17.6400 -112.3200      14.0        33       129        60
OIR    2025250     91400   17.6400 -112.3300      14.2        32       131        60
OIR    2025250     91400   17.6400 -112.3400      14.4        30       133        60
OIR    2025250     91400   17.6400 -112.3500      14.6        29       135        60
OIR    2025250     91400   17.6400 -112.3600      14.7        28       137        60
OIR    2025250     91400   17.6400 -112.3700      14.9        27       138        60
OIR    2025250     91400   17.6400 -112.3800      15.1        26       137        60
OIR    2025250     91400   17.6400 -112.3900      15.3        25       136        60
OIR    2025250     91400   17.6400 -112.4000      15.3        25       136        60
OIR    2025250     91400   17.6400 -112.4100      15.2        25       135        60
OIR    2025250     91400   17.6400 -112.4200      15.2        25       135        60
OIR    2025250     91400   17.6400 -112.4300      15.5        24       133        60
OIR    2025250     91400   17.6400 -112.4400      15.7        24       132        60
OIR    2025250     91400   17.6400 -112.4500      15.8        24       130        60
OIR    2025250     91400   17.6400 -112.4600      15.9        25       129        60
OIR    2025250     91400   17.6400 -112.4700      15.9        25       129        60
OIR    2025250     91400   17.6400 -112.4800      15.9        25       129        60
OIR    2025250     91400   17.6400 -112.4900      15.9        25       129        60
OIR    2025250     91400   17.6400 -112.5000      15.9        25       130        60
OIR    2025250     91400   17.6400 -112.5100      15.9        25       131        60
OIR    2025250     91400   17.6400 -112.5200      15.8        25       130        60
OIR    2025250     91400   17.6400 -112.5300      15.8        25       130        60
OIR    2025250     91400   17.6400 -112.5400      15.8        25       129        60
OIR    2025250     91400   17.6400 -112.5500      15.8        25       129        60
OIR    2025250     91400   17.6400 -112.5600      15.8        25       130        60
OIR    2025250     91400   17.6400 -112.5700      15.7        25       131        60
OIR    2025250     91400   17.6400 -112.5800      15.7        25       131        60
OIR    2025250     91400   17.6400 -112.5900      15.7        24       133        60
OIR    2025250     91400   17.6400 -112.6000      15.7        24       136        60
OIR    2025250     91400   17.6400 -112.6100      15.6        24       138        60
OIR    2025250     91400   17.6400 -112.6200      15.5        23       141        60
OIR    2025250     91400   17.6400 -112.6300      15.4        23       142        60
OIR    2025250     91400   17.6400 -112.6400      15.3        22       141        60
OIR    2025250     91400   17.6400 -112.6500      15.2        22       140        60
OIR    2025250     91400   17.6400 -112.6600      15.2        22       138        60
OIR    2025250     91400   17.6400 -112.6700      15.1        22       136        60
OIR    2025250     91400   17.6400 -112.6800      15.1        22       134        60
OIR    2025250     91400   17.6400 -112.6900      15.0        22       133        60
OIR    2025250     91400   17.6400 -112.7000      14.8        22       132        60
OIR    2025250     91400   17.6400 -112.7100      14.6        22       132        60
OIR    2025250     91400   17.6400 -112.7200      14.4        23       133        60
OIR    2025250     91400   17.6400 -112.7300      14.3        23       134        60
OIR    2025250     91400   17.6400 -112.7400      14.1        23       136        60
OIR    2025250     91400   17.6400 -112.7500      13.8        24       137        60
OIR    2025250     91400   17.6400 -112.7600      13.5        24       138        60
OIR    2025250     91400   17.6400 -112.7700      13.0        24       138        60
OIR    2025250     91400   17.6400 -112.7800      12.5        24       138        60
OIR    2025250     91400   17.6400 -112.7900      12.0        25       138        60
OIR    2025250     91400   17.6400 -112.8000      11.5        25       137        60
OIR    2025250     91400   17.6400 -112.8100      10.9        26       135        60
OIR    2025250     91400   17.6400 -112.8200      10.5        26       136        60
OIR    2025250     91400   17.6400 -112.8300      10.1        26       136        60
OIR    2025250     91400   17.6400 -112.8400       9.9        26       138        60
OIR    2025250     91400   17.6400 -112.8500       9.8        26       139        60
OIR    2025250     91400   17.6400 -112.8600       9.8        26       138        60
OIR    2025250     91400   17.6400 -112.8700       9.8        26       135        60
OIR    2025250     91400   17.6400 -112.8800       9.8        26       133        60
OIR    2025250     91400   17.6400 -112.8900       9.8        27       132        60
OIR    2025250     91400   17.6400 -112.9000       9.8        26       131        60
OIR    2025250     91400   17.6400 -112.9100       9.8        26       130        60
OIR    2025250     91400   17.6400 -112.9200       9.8        26       129        60
OIR    2025250     91400   17.6400 -112.9300       9.8        26       128        60
OIR    2025250     91400   17.6400 -112.9400       9.8        26       128        60
OIR    2025250     91400   17.6400 -112.9500       9.9        25       127        60
OIR    2025250     91400   17.6400 -112.9600      10.0        25       126        60
OIR    2025250     91400   17.6400 -112.9700      10.2        24       124        60
OIR    2025250     91400   17.6400 -112.9800      10.4        23       123        60
OIR    2025250     91400   17.6400 -112.9900      10.6        23       122        60
OIR    2025250     91400   17.6400 -113.0000      10.8        23       122        60
OIR    2025250     91400   17.6400 -113.0100      10.8        23       124        60
OIR    2025250     91400   17.6400 -113.0200      10.8        23       125        60
OIR    2025250     91400   17.6400 -113.0300      10.8        23       127        60
OIR    2025250     91400   17.6400 -113.0400      10.5        23       130        60
OIR    2025250     91400   17.6400 -113.0500      10.2        24       129        60
OIR    2025250     91400   17.6400 -113.0600       9.7        24       128        60
OIR    2025250     91400   17.6400 -113.0700       9.2        24       128        60
OIR    2025250     91400   17.6400 -113.0800       9.0        24       130        60
OIR    2025250     91400   17.6400 -113.0900       8.9        24       130        60
OIR    2025250     91400   17.6400 -113.1000       8.9        24       130        60
OIR    2025250     91400   17.6400 -113.1100       8.8        23       130        60
OIR    2025250     91400   17.6400 -113.1200       8.8        22       130        60
OIR    2025250     91400   17.6400 -113.1300       8.8        21       129        60
OIR    2025250     91400   17.6400 -113.1400       8.8        19       130        60
OIR    2025250     91400   17.6400 -113.1500       9.0        17       133        60
OIR    2025250     91400   17.6400 -113.1600       9.2        16       134        60
OIR    2025250     91400   17.6400 -113.1700       9.4        15       134        60
OIR    2025250     91400   17.6400 -113.1800       9.5        15       134        60
OIR    2025250     91400   17.6400 -113.1900       9.6        15       136        60
OIR    2025250     91400   17.6400 -113.2000       9.5        15       138        60
OIR    2025250     91400   17.6400 -113.2100       9.5        14       137        60
OIR    2025250     91400   17.6400 -113.2200       9.5        15       137        60
OIR    2025250     91400   17.6400 -113.2300       9.4        14       137        60
OIR    2025250     91400   17.6400 -113.2400       9.4        14       136        60
OIR    2025250     91400   17.6400 -113.2500       9.4        14       137        60
OIR    2025250     91400   17.6400 -113.2600       9.4        14       138        60
OIR    2025250     91400   17.6400 -113.2700       9.3        14       139        60
OIR    2025250     91400   17.6400 -113.2800       9.3        14       137        60
OIR    2025250     91400   17.6400 -113.2900       9.5        15       136        60
OIR    2025250     91400   17.6400 -113.3000       9.7        15       136        60
OIR    2025250     91400   17.6400 -113.3100       9.9        16       137        60
OIR    2025250     91400   17.6400 -113.3200      10.0        17       139        60
OIR    2025250     91400   17.6400 -113.3300      10.1        17       141        60
OIR    2025250     91400   17.6400 -113.3400      10.2        17       141        60
OIR    2025250     91400   17.6400 -113.3500      10.3        18       139        60
OIR    2025250     91400   17.6400 -113.3600      10.5        19       136        60
OIR    2025250     91400   17.6400 -113.3700      10.7        19       138        60
OIR    2025250     91400   17.6400 -113.3800      10.9        20       139        60
OIR    2025250     91400   17.6400 -113.3900      11.1        20       140        60
OIR    2025250     91400   17.6400 -113.4000      11.1        20       140        60
OIR    2025250     91400   17.6400 -113.4100      11.1        20       140        60
OIR    2025250     91400   17.6400 -113.4200      11.1        20       142        60
OIR    2025250     91400   17.6400 -113.4300      11.1        20       143        60
OIR    2025250     91400   17.6400 -113.4400      11.1        20       144        60
OIR    2025250     91400   17.6400 -113.4600      11.2        20       142        60
OIR    2025250     91400   17.6400 -113.4700      11.2        20       139        60
OIR    2025250     91400   17.6400 -113.4800      11.2        20       139        60
OIR    2025250     91400   17.6400 -113.5500      11.2        18       143        60
OIR    2025250     91400   17.6400 -113.5600      11.1        18       138        60
OIR    2025250     91400   17.6400 -113.5700      11.1        17       139        60
OIR    2025250     91400   17.6400 -113.6100      10.7        14       143        60
OIR    2025250     91400   17.6400 -113.7100       8.5       359       143        60
OIR    2025250     91400   17.6400 -113.7200       8.5       359       140        60
OIR    2025250     91400   17.6400 -113.7300       8.5       359       139        60
OIR    2025250     91400   17.6400 -113.7400       8.4       359       140        60
OIR    2025250     91400   17.6400 -113.7500       8.4       359       141        60
OIR    2025250     91400   17.6400 -113.7600       8.4       359       142        60
OIR    2025250     91400   17.6400 -113.7700       8.4       359       143        60
OIR    2025250     91400   17.6400 -113.8700       7.9         0       141        60
OIR    2025250     91400   17.6400 -113.8800       7.9         1       136        60
OIR    2025250     91400   17.6400 -113.8900       7.9         1       133        60
OIR    2025250     91400   17.6400 -113.9000       7.9         1       131        60
OIR    2025250     91400   17.6400 -113.9100       7.9         1       130        60
OIR    2025250     91400   17.6400 -113.9200       7.9         1       131        60
OIR    2025250     91400   17.6400 -113.9300       7.9         1       131        60
OIR    2025250     91400   17.6400 -113.9400       7.9         1       133        60
OIR    2025250     91400   17.6400 -113.9500       8.0         1       135        60
OIR    2025250     91400   17.6400 -113.9600       8.0         0       138        60
OIR    2025250     91400   17.6400 -113.9700       8.1         0       141        60
OIR    2025250     91400   17.6400 -113.9800       8.1         0       142        60
OIR    2025250     91400   17.6400 -113.9900       8.2         0       144        60
OIR    2025250     91400   17.6300 -110.5600      15.8        56       142        60
OIR    2025250     91400   17.6300 -110.5700      15.7        57       139        60
OIR    2025250     91400   17.6300 -110.5800      15.6        57       136        60
OIR    2025250     91400   17.6300 -110.5900      15.4        58       134        60
OIR    2025250     91400   17.6300 -110.6000      15.3        59       132        60
OIR    2025250     91400   17.6300 -110.6100      15.2        59       130        60
OIR    2025250     91400   17.6300 -110.6200      15.1        60       129        60
OIR    2025250     91400   17.6300 -110.6300      15.0        61       126        60
OIR    2025250     91400   17.6300 -110.6400      14.9        62       123        60
OIR    2025250     91400   17.6300 -110.6500      14.8        63       120        60
OIR    2025250     91400   17.6300 -110.6600      14.7        63       117        60
OIR    2025250     91400   17.6300 -110.6700      14.6        63       119        60
OIR    2025250     91400   17.6300 -110.6800      14.5        63       121        60
OIR    2025250     91400   17.6300 -110.6900      14.5        63       123        60
OIR    2025250     91400   17.6300 -110.7000      14.4        63       125        60
OIR    2025250     91400   17.6300 -110.7100      14.4        63       128        60
OIR    2025250     91400   17.6300 -110.7200      14.4        63       131        60
OIR    2025250     91400   17.6300 -110.7300      14.4        62       134        60
OIR    2025250     91400   17.6300 -110.7400      14.5        62       137        60
OIR    2025250     91400   17.6300 -110.7500      14.5        62       139        60
OIR    2025250     91400   17.6300 -110.7600      14.4        62       141        60
OIR    2025250     91400   17.6300 -110.7700      14.3        62       139        60
OIR    2025250     91400   17.6300 -110.7800      14.2        62       138        60
OIR    2025250     91400   17.6300 -110.7900      14.0        62       135        60
OIR    2025250     91400   17.6300 -110.8000      13.7        62       133        60
OIR    2025250     91400   17.6300 -110.8100      13.7        62       134        60
OIR    2025250     91400   17.6300 -110.8200      13.7        62       138        60
OIR    2025250     91400   17.6300 -110.8300      13.7        62       142        60
OIR    2025250     91400   17.6300 -110.8800      13.7        62       144        60
OIR    2025250     91400   17.6300 -111.2900      20.1        61       140        60
OIR    2025250     91400   17.6300 -111.3000      20.3        61       131        60
OIR    2025250     91400   17.6300 -111.3100      20.4        62       121        60
OIR    2025250     91400   17.6300 -111.3200      20.4        61       111        60
OIR    2025250     91400   17.6300 -111.3300      19.7        60       104        60
OIR    2025250     91400   17.6300 -111.3400      18.4        58       103        60
OIR    2025250     91400   17.6300 -111.3500      17.7        58       103        60
OIR    2025250     91400   17.6300 -111.3600      17.1        58       103        60
OIR    2025250     91400   17.6300 -111.3700      16.6        58       103        60
OIR    2025250     91400   17.6300 -111.3800      16.3        58       103        60
OIR    2025250     91400   17.6300 -111.3900      16.2        58       103        60
OIR    2025250     91400   17.6300 -111.4000      16.1        58       103        60
OIR    2025250     91400   17.6300 -111.4100      16.0        57       103        60
OIR    2025250     91400   17.6300 -111.4200      15.7        57       103        60
OIR    2025250     91400   17.6300 -111.4300      15.6        57       103        60
OIR    2025250     91400   17.6300 -111.4400      15.5        57       103        60
OIR    2025250     91400   17.6300 -111.4500      15.5        57       103        60
OIR    2025250     91400   17.6300 -111.4600      15.4        57       103        60
OIR    2025250     91400   17.6300 -111.4700      15.4        57       103        60
OIR    2025250     91400   17.6300 -111.4800      15.4        57       103        60
OIR    2025250     91400   17.6300 -111.4900      15.4        57       103        60
OIR    2025250     91400   17.6300 -111.5000      15.2        55       103        60
OIR    2025250     91400   17.6300 -111.5100      15.0        52       103        60
OIR    2025250     91400   17.6300 -111.5200      14.9        52       103        60
OIR    2025250     91400   17.6300 -111.5300      14.7        51       103        60
OIR    2025250     91400   17.6300 -111.5400      14.2        51       104        60
OIR    2025250     91400   17.6300 -111.5500      13.6        50       107        60
OIR    2025250     91400   17.6300 -111.5600      12.7        51       109        60
OIR    2025250     91400   17.6300 -111.5700      12.4        52       114        60
OIR    2025250     91400   17.6300 -111.5800      12.5        53       120        60
OIR    2025250     91400   17.6300 -111.5900      13.1        56       127        60
OIR    2025250     91400   17.6300 -111.6000      13.3        55       134        60
OIR    2025250     91400   17.6300 -111.6100      13.5        50       142        60
OIR    2025250     91400   17.6300 -111.7000      14.1        48       143        60
OIR    2025250     91400   17.6300 -111.7100      14.7        48       139        60
OIR    2025250     91400   17.6300 -111.7200      14.9        49       135        60
OIR    2025250     91400   17.6300 -111.7300      15.1        49       133        60
OIR    2025250     91400   17.6300 -111.7400      15.2        49       134        60
OIR    2025250     91400   17.6300 -111.7500      15.2        49       136        60
OIR    2025250     91400   17.6300 -111.7600      15.2        48       140        60
OIR    2025250     91400   17.6300 -111.7700      15.2        48       143        60
OIR    2025250     91400   17.6300 -111.7800      15.2        48       144        60
OIR    2025250     91400   17.6300 -111.9700      14.8        47       143        60
OIR    2025250     91400   17.6300 -111.9800      14.8        47       141        60
OIR    2025250     91400   17.6300 -111.9900      14.7        47       144        60
OIR    2025250     91400   17.6300 -112.1800      14.5        46       142        60
OIR    2025250     91400   17.6300 -112.1900      14.4        45       139        60
OIR    2025250     91400   17.6300 -112.2000      14.1        40       138        60
OIR    2025250     91400   17.6300 -112.2100      14.0        37       136        60
OIR    2025250     91400   17.6300 -112.2200      13.9        36       134        60
OIR    2025250     91400   17.6300 -112.2300      13.9        36       132        60
OIR    2025250     91400   17.6300 -112.2400      13.9        36       129        60
OIR    2025250     91400   17.6300 -112.2500      13.9        36       128        60
OIR    2025250     91400   17.6300 -112.2600      13.9        36       126        60
OIR    2025250     91400   17.6300 -112.2700      13.9        36       123        60
OIR    2025250     91400   17.6300 -112.2800      13.9        36       119        60
OIR    2025250     91400   17.6300 -112.2900      13.9        36       122        60
OIR    2025250     91400   17.6300 -112.3000      13.9        36       125        60
OIR    2025250     91400   17.6300 -112.3100      13.9        34       128        60
OIR    2025250     91400   17.6300 -112.3200      14.0        32       131        60
OIR    2025250     91400   17.6300 -112.3300      14.4        30       133        60
OIR    2025250     91400   17.6300 -112.3400      14.9        27       134        60
OIR    2025250     91400   17.6300 -112.3500      15.3        26       135        60
OIR    2025250     91400   17.6300 -112.3600      15.5        26       136        60
OIR    2025250     91400   17.6300 -112.3700      15.6        25       138        60
OIR    2025250     91400   17.6300 -112.3800      15.8        25       138        60
OIR    2025250     91400   17.6300 -112.3900      15.9        24       137        60
OIR    2025250     91400   17.6300 -112.4000      16.0        24       136        60
OIR    2025250     91400   17.6300 -112.4100      16.0        24       136        60
OIR    2025250     91400   17.6300 -112.4200      16.0        24       135        60
OIR    2025250     91400   17.6300 -112.4300      16.0        24       134        60
OIR    2025250     91400   17.6300 -112.4400      16.1        24       133        60
OIR    2025250     91400   17.6300 -112.4500      16.0        24       132        60
OIR    2025250     91400   17.6300 -112.4600      16.0        25       131        60
OIR    2025250     91400   17.6300 -112.4700      16.0        25       130        60
OIR    2025250     91400   17.6300 -112.4800      16.0        25       131        60
OIR    2025250     91400   17.6300 -112.4900      15.9        25       131        60
OIR    2025250     91400   17.6300 -112.5000      15.9        25       131        60
OIR    2025250     91400   17.6300 -112.5100      15.9        25       131        60
OIR    2025250     91400   17.6300 -112.5200      15.9        25       130        60
OIR    2025250     91400   17.6300 -112.5300      15.8        25       129        60
OIR    2025250     91400   17.6300 -112.5400      15.8        25       128        60
OIR    2025250     91400   17.6300 -112.5500      15.8        25       128        60
OIR    2025250     91400   17.6300 -112.5600      15.7        25       129        60
OIR    2025250     91400   17.6300 -112.5700      15.7        24       130        60
OIR    2025250     91400   17.6300 -112.5800      15.7        24       131        60
OIR    2025250     91400   17.6300 -112.5900      15.7        24       132        60
OIR    2025250     91400   17.6300 -112.6000      15.6        24       132        60
OIR    2025250     91400   17.6300 -112.6100      15.6        24       134        60
OIR    2025250     91400   17.6300 -112.6200      15.5        23       137        60
OIR    2025250     91400   17.6300 -112.6300      15.4        23       140        60
OIR    2025250     91400   17.6300 -112.6400      15.3        23       137        60
OIR    2025250     91400   17.6300 -112.6500      15.2        22       136        60
OIR    2025250     91400   17.6300 -112.6600      15.2        22       134        60
OIR    2025250     91400   17.6300 -112.6700      15.1        22       133        60
OIR    2025250     91400   17.6300 -112.6800      15.1        22       132        60
OIR    2025250     91400   17.6300 -112.6900      15.0        22       131        60
OIR    2025250     91400   17.6300 -112.7000      14.9        22       131        60
OIR    2025250     91400   17.6300 -112.7100      14.7        23       132        60
OIR    2025250     91400   17.6300 -112.7200      14.5        23       133        60
OIR    2025250     91400   17.6300 -112.7300      14.4        23       134        60
OIR    2025250     91400   17.6300 -112.7400      14.3        23       136        60
OIR    2025250     91400   17.6300 -112.7500      14.1        24       137        60
OIR    2025250     91400   17.6300 -112.7600      13.9        24       138        60
OIR    2025250     91400   17.6300 -112.7700      13.5        24       138        60
OIR    2025250     91400   17.6300 -112.7800      13.1        24       137        60
OIR    2025250     91400   17.6300 -112.7900      12.6        25       137        60
OIR    2025250     91400   17.6300 -112.8000      12.1        25       136        60
OIR    2025250     91400   17.6300 -112.8100      11.6        26       135        60
OIR    2025250     91400   17.6300 -112.8200      11.0        26       136        60
OIR    2025250     91400   17.6300 -112.8300      10.6        26       136        60
OIR    2025250     91400   17.6300 -112.8400      10.2        26       137        60
OIR    2025250     91400   17.6300 -112.8500      10.0        26       139        60
OIR    2025250     91400   17.6300 -112.8600       9.9        26       140        60
OIR    2025250     91400   17.6300 -112.8700       9.8        27       137        60
OIR    2025250     91400   17.6300 -112.8800       9.8        27       134        60
OIR    2025250     91400   17.6300 -112.8900       9.8        27       133        60
OIR    2025250     91400   17.6300 -112.9000       9.8        27       132        60
OIR    2025250     91400   17.6300 -112.9100       9.8        26       132        60
OIR    2025250     91400   17.6300 -112.9200       9.8        26       131        60
OIR    2025250     91400   17.6300 -112.9300       9.8        26       130        60
OIR    2025250     91400   17.6300 -112.9400       9.9        26       129        60
OIR    2025250     91400   17.6300 -112.9500       9.9        25       129        60
OIR    2025250     91400   17.6300 -112.9600      10.0        25       128        60
OIR    2025250     91400   17.6300 -112.9700      10.3        24       126        60
OIR    2025250     91400   17.6300 -112.9800      10.7        23       125        60
OIR    2025250     91400   17.6300 -112.9900      10.9        23       124        60
OIR    2025250     91400   17.6300 -113.0000      11.0        22       125        60
OIR    2025250     91400   17.6300 -113.0100      11.1        22       126        60
OIR    2025250     91400   17.6300 -113.0200      11.0        23       127        60
OIR    2025250     91400   17.6300 -113.0300      11.0        23       129        60
OIR    2025250     91400   17.6300 -113.0400      10.9        22       131        60
OIR    2025250     91400   17.6300 -113.0500      10.7        23       130        60
OIR    2025250     91400   17.6300 -113.0600      10.3        24       129        60
OIR    2025250     91400   17.6300 -113.0700       9.9        24       129        60
OIR    2025250     91400   17.6300 -113.0800       9.5        24       130        60
OIR    2025250     91400   17.6300 -113.0900       9.2        23       131        60
OIR    2025250     91400   17.6300 -113.1000       9.1        23       131        60
OIR    2025250     91400   17.6300 -113.1100       9.1        22       132        60
OIR    2025250     91400   17.6300 -113.1200       9.0        21       131        60
OIR    2025250     91400   17.6300 -113.1300       9.1        20       131        60
OIR    2025250     91400   17.6300 -113.1400       9.1        18       132        60
OIR    2025250     91400   17.6300 -113.1500       9.3        17       135        60
OIR    2025250     91400   17.6300 -113.1600       9.5        15       137        60
OIR    2025250     91400   17.6300 -113.1700       9.6        15       135        60
OIR    2025250     91400   17.6300 -113.1800       9.7        15       133        60
OIR    2025250     91400   17.6300 -113.1900       9.7        15       137        60
OIR    2025250     91400   17.6300 -113.2000       9.7        15       141        60
OIR    2025250     91400   17.6300 -113.2100       9.7        15       140        60
OIR    2025250     91400   17.6300 -113.2200       9.7        15       138        60
OIR    2025250     91400   17.6300 -113.2300       9.7        14       137        60
OIR    2025250     91400   17.6300 -113.2400       9.7        14       136        60
OIR    2025250     91400   17.6300 -113.2500       9.7        14       135        60
OIR    2025250     91400   17.6300 -113.2600       9.7        14       136        60
OIR    2025250     91400   17.6300 -113.2700       9.6        14       137        60
OIR    2025250     91400   17.6300 -113.2800       9.7        14       136        60
OIR    2025250     91400   17.6300 -113.2900       9.8        15       135        60
OIR    2025250     91400   17.6300 -113.3000      10.0        15       136        60
OIR    2025250     91400   17.6300 -113.3100      10.1        16       138        60
OIR    2025250     91400   17.6300 -113.3200      10.2        16       140        60
OIR    2025250     91400   17.6300 -113.3300      10.2        17       140        60
OIR    2025250     91400   17.6300 -113.3400      10.3        17       140        60
OIR    2025250     91400   17.6300 -113.3500      10.4        18       139        60
OIR    2025250     91400   17.6300 -113.3600      10.6        19       137        60
OIR    2025250     91400   17.6300 -113.3700      10.8        19       137        60
OIR    2025250     91400   17.6300 -113.3800      10.9        20       138        60
OIR    2025250     91400   17.6300 -113.3900      11.1        20       138        60
OIR    2025250     91400   17.6300 -113.4000      11.1        20       139        60
OIR    2025250     91400   17.6300 -113.4100      11.1        20       139        60
OIR    2025250     91400   17.6300 -113.4200      11.1        20       141        60
OIR    2025250     91400   17.6300 -113.4300      11.1        20       143        60
OIR    2025250     91400   17.6300 -113.4400      11.1        20       144        60
OIR    2025250     91400   17.6300 -113.4600      11.2        20       143        60
OIR    2025250     91400   17.6300 -113.4700      11.2        20       138        60
OIR    2025250     91400   17.6300 -113.4800      11.2        20       138        60
OIR    2025250     91400   17.6300 -113.5600      11.2        18       141        60
OIR    2025250     91400   17.6300 -113.5700      11.1        17       140        60
OIR    2025250     91400   17.6300 -113.7100       8.6       360       144        60
OIR    2025250     91400   17.6300 -113.7200       8.5       360       141        60
OIR    2025250     91400   17.6300 -113.7300       8.5       359       141        60
OIR    2025250     91400   17.6300 -113.7400       8.5       359       141        60
OIR    2025250     91400   17.6300 -113.7500       8.5       359       142        60
OIR    2025250     91400   17.6300 -113.7600       8.5       359       142        60
OIR    2025250     91400   17.6300 -113.7700       8.5       359       142        60
OIR    2025250     91400   17.6300 -113.7800       8.4       359       144        60
OIR    2025250     91400   17.6300 -113.8700       7.9         0       141        60
OIR    2025250     91400   17.6300 -113.8800       7.9         0       135        60
OIR    2025250     91400   17.6300 -113.8900       7.9         1       133        60
OIR    2025250     91400   17.6300 -113.9000       7.9         1       131        60
OIR    2025250     91400   17.6300 -113.9100       7.9         1       131        60
OIR    2025250     91400   17.6300 -113.9200       7.9         0       132        60
OIR    2025250     91400   17.6300 -113.9300       7.9         0       133        60
OIR    2025250     91400   17.6300 -113.9400       7.9         1       134        60
OIR    2025250     91400   17.6300 -113.9500       8.0         1       134        60
OIR    2025250     91400   17.6300 -113.9600       8.1         1       136        60
OIR    2025250     91400   17.6300 -113.9700       8.1         1       139        60
OIR    2025250     91400   17.6300 -113.9800       8.2         0       142        60
OIR    2025250     91400   17.6300 -113.9900       8.3         0       142        60
OIR    2025250     91400   17.6200 -110.5500      15.9        55       143        60
OIR    2025250     91400   17.6200 -110.5600      15.7        56       141        60
OIR    2025250     91400   17.6200 -110.5700      15.6        57       139        60
OIR    2025250     91400   17.6200 -110.5800      15.5        58       137        60
OIR    2025250     91400   17.6200 -110.5900      15.3        58       134        60
OIR    2025250     91400   17.6200 -110.6000      15.2        59       132        60
OIR    2025250     91400   17.6200 -110.6100      15.1        59       131        60
OIR    2025250     91400   17.6200 -110.6200      15.1        60       129        60
OIR    2025250     91400   17.6200 -110.6300      14.9        61       126        60
OIR    2025250     91400   17.6200 -110.6400      14.7        62       124        60
OIR    2025250     91400   17.6200 -110.6500      14.6        62       122        60
OIR    2025250     91400   17.6200 -110.6600      14.6        63       121        60
OIR    2025250     91400   17.6200 -110.6700      14.5        63       122        60
OIR    2025250     91400   17.6200 -110.6800      14.4        63       124        60
OIR    2025250     91400   17.6200 -110.6900      14.4        63       127        60
OIR    2025250     91400   17.6200 -110.7000      14.4        63       129        60
OIR    2025250     91400   17.6200 -110.7100      14.4        63       130        60
OIR    2025250     91400   17.6200 -110.7200      14.4        63       133        60
OIR    2025250     91400   17.6200 -110.7300      14.4        63       135        60
OIR    2025250     91400   17.6200 -110.7400      14.3        63       138        60
OIR    2025250     91400   17.6200 -110.7500      14.3        62       140        60
OIR    2025250     91400   17.6200 -110.7600      14.2        62       143        60
OIR    2025250     91400   17.6200 -110.7700      14.1        62       142        60
OIR    2025250     91400   17.6200 -110.7800      13.9        62       140        60
OIR    2025250     91400   17.6200 -110.7900      13.8        62       137        60
OIR    2025250     91400   17.6200 -110.8000      13.7        62       133        60
OIR    2025250     91400   17.6200 -110.8100      13.6        62       132        60
OIR    2025250     91400   17.6200 -110.8200      13.6        62       136        60
OIR    2025250     91400   17.6200 -110.8300      13.6        62       141        60
OIR    2025250     91400   17.6200 -110.8400      13.6        62       142        60
OIR    2025250     91400   17.6200 -110.8500      13.6        62       142        60
OIR    2025250     91400   17.6200 -110.8600      13.6        62       141        60
OIR    2025250     91400   17.6200 -110.8700      13.6        62       138        60
OIR    2025250     91400   17.6200 -110.8800      13.6        62       137        60
OIR    2025250     91400   17.6200 -110.8900      13.6        62       141        60
OIR    2025250     91400   17.6200 -111.3000      19.9        61       138        60
OIR    2025250     91400   17.6200 -111.3100      20.1        60       129        60
OIR    2025250     91400   17.6200 -111.3200      19.7        57       120        60
OIR    2025250     91400   17.6200 -111.3300      19.3        56       112        60
OIR    2025250     91400   17.6200 -111.3400      18.6        56       108        60
OIR    2025250     91400   17.6200 -111.3500      17.6        56       104        60
OIR    2025250     91400   17.6200 -111.3600      17.1        56       104        60
OIR    2025250     91400   17.6200 -111.3700      16.8        57       103        60
OIR    2025250     91400   17.6200 -111.3800      16.5        57       103        60
OIR    2025250     91400   17.6200 -111.3900      16.4        57       103        60
OIR    2025250     91400   17.6200 -111.4000      16.3        57       103        60
OIR    2025250     91400   17.6200 -111.4100      16.4        56       103        60
OIR    2025250     91400   17.6200 -111.4200      16.2        56       103        60
OIR    2025250     91400   17.6200 -111.4300      15.8        57       103        60
OIR    2025250     91400   17.6200 -111.4400      15.6        57       103        60
OIR    2025250     91400   17.6200 -111.4500      15.5        57       103        60
OIR    2025250     91400   17.6200 -111.4600      15.5        57       103        60
OIR    2025250     91400   17.6200 -111.4700      15.4        57       103        60
OIR    2025250     91400   17.6200 -111.4800      15.4        57       103        60
OIR    2025250     91400   17.6200 -111.4900      15.4        57       103        60
OIR    2025250     91400   17.6200 -111.5000      15.2        55       103        60
OIR    2025250     91400   17.6200 -111.5100      15.1        52       103        60
OIR    2025250     91400   17.6200 -111.5200      15.0        51       103        60
OIR    2025250     91400   17.6200 -111.5300      14.9        51       103        60
OIR    2025250     91400   17.6200 -111.5400      14.8        50       104        60
OIR    2025250     91400   17.6200 -111.5500      14.7        49       107        60
OIR    2025250     91400   17.6200 -111.5600      14.5        49       109        60
OIR    2025250     91400   17.6200 -111.5700      14.4        50       113        60
OIR    2025250     91400   17.6200 -111.5800      14.5        50       119        60
OIR    2025250     91400   17.6200 -111.5900      14.7        51       124        60
OIR    2025250     91400   17.6200 -111.6000      14.8        52       130        60
OIR    2025250     91400   17.6200 -111.6100      14.5        49       138        60
OIR    2025250     91400   17.6200 -111.7100      14.8        48       142        60
OIR    2025250     91400   17.6200 -111.7200      14.9        48       139        60
OIR    2025250     91400   17.6200 -111.7300      15.0        48       137        60
OIR    2025250     91400   17.6200 -111.7400      15.1        48       136        60
OIR    2025250     91400   17.6200 -111.7500      15.2        48       136        60
OIR    2025250     91400   17.6200 -111.7600      15.2        48       137        60
OIR    2025250     91400   17.6200 -111.7700      15.2        48       137        60
OIR    2025250     91400   17.6200 -111.7800      15.2        48       140        60
OIR    2025250     91400   17.6200 -111.7900      15.2        48       144        60
OIR    2025250     91400   17.6200 -111.9700      14.8        47       143        60
OIR    2025250     91400   17.6200 -111.9800      14.8        47       141        60
OIR    2025250     91400   17.6200 -111.9900      14.7        47       144        60
OIR    2025250     91400   17.6200 -112.1900      14.4        44       141        60
OIR    2025250     91400   17.6200 -112.2000      14.1        39       137        60
OIR    2025250     91400   17.6200 -112.2100      13.9        36       133        60
OIR    2025250     91400   17.6200 -112.2200      13.9        36       131        60
OIR    2025250     91400   17.6200 -112.2300      13.9        36       130        60
OIR    2025250     91400   17.6200 -112.2400      13.9        36       129        60
OIR    2025250     91400   17.6200 -112.2500      13.9        36       128        60
OIR    2025250     91400   17.6200 -112.2600      13.9        36       126        60
OIR    2025250     91400   17.6200 -112.2700      13.9        36       124        60
OIR    2025250     91400   17.6200 -112.2800      13.9        36       122        60
OIR    2025250     91400   17.6200 -112.2900      14.0        35       123        60
OIR    2025250     91400   17.6200 -112.3000      14.1        33       125        60
OIR    2025250     91400   17.6200 -112.3100      14.2        31       128        60
OIR    2025250     91400   17.6200 -112.3200      14.2        29       132        60
OIR    2025250     91400   17.6200 -112.3300      14.8        26       135        60
OIR    2025250     91400   17.6200 -112.3400      15.3        24       135        60
OIR    2025250     91400   17.6200 -112.3500      15.7        24       135        60
OIR    2025250     91400   17.6200 -112.3600      15.9        24       135        60
OIR    2025250     91400   17.6200 -112.3700      16.0        24       136        60
OIR    2025250     91400   17.6200 -112.3800      16.2        24       136        60
OIR    2025250     91400   17.6200 -112.3900      16.2        24       136        60
OIR    2025250     91400   17.6200 -112.4000      16.3        24       135        60
OIR    2025250     91400   17.6200 -112.4100      16.3        24       134        60
OIR    2025250     91400   17.6200 -112.4200      16.3        24       134        60
OIR    2025250     91400   17.6200 -112.4300      16.3        24       134        60
OIR    2025250     91400   17.6200 -112.4400      16.3        24       134        60
OIR    2025250     91400   17.6200 -112.4500      16.2        24       134        60
OIR    2025250     91400   17.6200 -112.4600      16.1        25       133        60
OIR    2025250     91400   17.6200 -112.4700      16.1        25       131        60
OIR    2025250     91400   17.6200 -112.4800      16.0        25       131        60
OIR    2025250     91400   17.6200 -112.4900      16.0        25       131        60
OIR    2025250     91400   17.6200 -112.5000      16.0        25       131        60
OIR    2025250     91400   17.6200 -112.5100      15.9        25       131        60
OIR    2025250     91400   17.6200 -112.5200      15.9        25       131        60
OIR    2025250     91400   17.6200 -112.5300      15.8        25       130        60
OIR    2025250     91400   17.6200 -112.5400      15.8        25       129        60
OIR    2025250     91400   17.6200 -112.5500      15.8        25       130        60
OIR    2025250     91400   17.6200 -112.5600      15.7        25       130        60
OIR    2025250     91400   17.6200 -112.5700      15.7        24       130        60
OIR    2025250     91400   17.6200 -112.5800      15.7        24       130        60
OIR    2025250     91400   17.6200 -112.5900      15.6        24       130        60
OIR    2025250     91400   17.6200 -112.6000      15.6        24       131        60
OIR    2025250     91400   17.6200 -112.6100      15.5        24       132        60
OIR    2025250     91400   17.6200 -112.6200      15.5        23       134        60
OIR    2025250     91400   17.6200 -112.6300      15.4        23       136        60
OIR    2025250     91400   17.6200 -112.6400      15.4        23       134        60
OIR    2025250     91400   17.6200 -112.6500      15.3        23       132        60
OIR    2025250     91400   17.6200 -112.6600      15.2        22       131        60
OIR    2025250     91400   17.6200 -112.6700      15.2        22       130        60
OIR    2025250     91400   17.6200 -112.6800      15.1        22       130        60
OIR    2025250     91400   17.6200 -112.6900      15.0        22       130        60
OIR    2025250     91400   17.6200 -112.7000      14.9        23       130        60
OIR    2025250     91400   17.6200 -112.7100      14.7        23       132        60
OIR    2025250     91400   17.6200 -112.7200      14.6        23       134        60
OIR    2025250     91400   17.6200 -112.7300      14.5        24       135        60
OIR    2025250     91400   17.6200 -112.7400      14.4        24       136        60
OIR    2025250     91400   17.6200 -112.7500      14.3        24       137        60
OIR    2025250     91400   17.6200 -112.7600      14.2        24       138        60
OIR    2025250     91400   17.6200 -112.7700      14.0        24       138        60
OIR    2025250     91400   17.6200 -112.7800      13.7        24       137        60
OIR    2025250     91400   17.6200 -112.7900      13.2        25       136        60
OIR    2025250     91400   17.6200 -112.8000      12.8        25       136        60
OIR    2025250     91400   17.6200 -112.8100      12.3        26       136        60
OIR    2025250     91400   17.6200 -112.8200      11.8        26       136        60
OIR    2025250     91400   17.6200 -112.8300      11.3        26       136        60
OIR    2025250     91400   17.6200 -112.8400      10.7        26       137        60
OIR    2025250     91400   17.6200 -112.8500      10.3        26       139        60
OIR    2025250     91400   17.6200 -112.8600      10.1        26       142        60
OIR    2025250     91400   17.6200 -112.8700      10.0        27       139        60
OIR    2025250     91400   17.6200 -112.8800       9.9        27       136        60
OIR    2025250     91400   17.6200 -112.8900       9.8        27       134        60
OIR    2025250     91400   17.6200 -112.9000       9.8        27       134        60
OIR    2025250     91400   17.6200 -112.9100       9.8        26       133        60
OIR    2025250     91400   17.6200 -112.9200       9.9        26       132        60
OIR    2025250     91400   17.6200 -112.9300       9.9        26       132        60
OIR    2025250     91400   17.6200 -112.9400       9.9        26       131        60
OIR    2025250     91400   17.6200 -112.9500      10.0        25       131        60
OIR    2025250     91400   17.6200 -112.9600      10.2        25       130        60
OIR    2025250     91400   17.6200 -112.9700      10.5        24       129        60
OIR    2025250     91400   17.6200 -112.9800      10.9        23       128        60
OIR    2025250     91400   17.6200 -112.9900      11.1        22       128        60
OIR    2025250     91400   17.6200 -113.0000      11.1        22       128        60
OIR    2025250     91400   17.6200 -113.0100      11.1        22       130        60
OIR    2025250     91400   17.6200 -113.0200      11.1        22       132        60
OIR    2025250     91400   17.6200 -113.0300      11.1        22       132        60
OIR    2025250     91400   17.6200 -113.0400      11.1        22       133        60
OIR    2025250     91400   17.6200 -113.0500      11.0        23       132        60
OIR    2025250     91400   17.6200 -113.0600      10.8        23       131        60
OIR    2025250     91400   17.6200 -113.0700      10.4        23       130        60
OIR    2025250     91400   17.6200 -113.0800      10.0        23       132        60
OIR    2025250     91400   17.6200 -113.0900       9.7        22       134        60
OIR    2025250     91400   17.6200 -113.1000       9.5        22       134        60
OIR    2025250     91400   17.6200 -113.1100       9.4        21       134        60
OIR    2025250     91400   17.6200 -113.1200       9.4        20       133        60
OIR    2025250     91400   17.6200 -113.1300       9.4        18       132        60
OIR    2025250     91400   17.6200 -113.1400       9.5        17       133        60
OIR    2025250     91400   17.6200 -113.1500       9.6        15       136        60
OIR    2025250     91400   17.6200 -113.1600       9.7        15       138        60
OIR    2025250     91400   17.6200 -113.1700       9.7        15       138        60
OIR    2025250     91400   17.6200 -113.1800       9.7        15       137        60
OIR    2025250     91400   17.6200 -113.1900       9.7        15       137        60
OIR    2025250     91400   17.6200 -113.2000       9.7        15       137        60
OIR    2025250     91400   17.6200 -113.2100       9.7        15       138        60
OIR    2025250     91400   17.6200 -113.2200       9.7        15       139        60
OIR    2025250     91400   17.6200 -113.2300       9.7        14       139        60
OIR    2025250     91400   17.6200 -113.2400       9.7        14       137        60
OIR    2025250     91400   17.6200 -113.2500       9.8        14       136        60
OIR    2025250     91400   17.6200 -113.2600       9.9        14       137        60
OIR    2025250     91400   17.6200 -113.2700      10.1        14       138        60
OIR    2025250     91400   17.6200 -113.2800      10.3        13       138        60
OIR    2025250     91400   17.6200 -113.2900      10.3        14       138        60
OIR    2025250     91400   17.6200 -113.3000      10.3        15       139        60
OIR    2025250     91400   17.6200 -113.3100      10.3        15       140        60
OIR    2025250     91400   17.6200 -113.3200      10.3        16       142        60
OIR    2025250     91400   17.6200 -113.3300      10.3        17       141        60
OIR    2025250     91400   17.6200 -113.3400      10.4        17       140        60
OIR    2025250     91400   17.6200 -113.3500      10.5        18       138        60
OIR    2025250     91400   17.6200 -113.3600      10.7        19       137        60
OIR    2025250     91400   17.6200 -113.3700      10.8        19       137        60
OIR    2025250     91400   17.6200 -113.3800      11.0        20       138        60
OIR    2025250     91400   17.6200 -113.3900      11.1        20       139        60
OIR    2025250     91400   17.6200 -113.4000      11.1        20       138        60
OIR    2025250     91400   17.6200 -113.4100      11.1        20       137        60
OIR    2025250     91400   17.6200 -113.4200      11.2        20       139        60
OIR    2025250     91400   17.6200 -113.4300      11.2        20       140        60
OIR    2025250     91400   17.6200 -113.4400      11.2        20       142        60
OIR    2025250     91400   17.6200 -113.4600      11.2        20       144        60
OIR    2025250     91400   17.6200 -113.4700      11.3        20       139        60
OIR    2025250     91400   17.6200 -113.4800      11.3        20       138        60
OIR    2025250     91400   17.6200 -113.5600      11.2        18       144        60
OIR    2025250     91400   17.6200 -113.5700      11.2        17       141        60
OIR    2025250     91400   17.6200 -113.7000       9.1         2       144        60
OIR    2025250     91400   17.6200 -113.7100       8.8         0       144        60
OIR    2025250     91400   17.6200 -113.7400       8.5       360       143        60
OIR    2025250     91400   17.6200 -113.7500       8.5       359       142        60
OIR    2025250     91400   17.6200 -113.7600       8.5       359       142        60
OIR    2025250     91400   17.6200 -113.7700       8.5       359       142        60
OIR    2025250     91400   17.6200 -113.8800       7.9         0       142        60
OIR    2025250     91400   17.6200 -113.8900       7.9         0       139        60
OIR    2025250     91400   17.6200 -113.9000       7.9         0       138        60
OIR    2025250     91400   17.6200 -113.9100       7.9         0       138        60
OIR    2025250     91400   17.6200 -113.9200       7.9         0       139        60
OIR    2025250     91400   17.6200 -113.9300       7.9         0       140        60
OIR    2025250     91400   17.6200 -113.9400       7.9         0       138        60
OIR    2025250     91400   17.6200 -113.9500       8.1         0       136        60
OIR    2025250     91400   17.6200 -113.9600       8.2         1       137        60
OIR    2025250     91400   17.6200 -113.9700       8.3         1       140        60
OIR    2025250     91400   17.6200 -113.9800       8.4         0       143        60
OIR    2025250     91400   17.6100 -110.5300      16.0        54       144        60
OIR    2025250     91400   17.6100 -110.5400      15.9        54       143        60
OIR    2025250     91400   17.6100 -110.5500      15.8        55       141        60
OIR    2025250     91400   17.6100 -110.5600      15.6        56       139        60
OIR    2025250     91400   17.6100 -110.5700      15.5        57       138        60
OIR    2025250     91400   17.6100 -110.5800      15.4        58       136        60
OIR    2025250     91400   17.6100 -110.5900      15.3        58       135        60
OIR    2025250     91400   17.6100 -110.6000      15.1        59       133        60
OIR    2025250     91400   17.6100 -110.6100      15.1        59       131        60
OIR    2025250     91400   17.6100 -110.6200      14.9        60       128        60
OIR    2025250     91400   17.6100 -110.6300      14.8        61       127        60
OIR    2025250     91400   17.6100 -110.6400      14.6        62       126        60
OIR    2025250     91400   17.6100 -110.6500      14.5        62       125        60
OIR    2025250     91400   17.6100 -110.6600      14.5        62       126        60
OIR    2025250     91400   17.6100 -110.6700      14.4        63       127        60
OIR    2025250     91400   17.6100 -110.6800      14.4        63       129        60
OIR    2025250     91400   17.6100 -110.6900      14.3        63       131        60
OIR    2025250     91400   17.6100 -110.7000      14.3        63       132        60
OIR    2025250     91400   17.6100 -110.7100      14.3        63       133        60
OIR    2025250     91400   17.6100 -110.7200      14.3        63       135        60
OIR    2025250     91400   17.6100 -110.7300      14.2        63       137        60
OIR    2025250     91400   17.6100 -110.7400      14.2        63       139        60
OIR    2025250     91400   17.6100 -110.7500      14.1        62       140        60
OIR    2025250     91400   17.6100 -110.7600      13.9        62       140        60
OIR    2025250     91400   17.6100 -110.7700      13.8        62       140        60
OIR    2025250     91400   17.6100 -110.7800      13.7        62       139        60
OIR    2025250     91400   17.6100 -110.7900      13.7        62       138        60
OIR    2025250     91400   17.6100 -110.8000      13.6        62       135        60
OIR    2025250     91400   17.6100 -110.8100      13.6        62       133        60
OIR    2025250     91400   17.6100 -110.8200      13.6        62       135        60
OIR    2025250     91400   17.6100 -110.8300      13.6        62       137        60
OIR    2025250     91400   17.6100 -110.8400      13.6        62       138        60
OIR    2025250     91400   17.6100 -110.8500      13.6        62       138        60
OIR    2025250     91400   17.6100 -110.8600      13.6        62       139        60
OIR    2025250     91400   17.6100 -110.8700      13.6        62       138        60
OIR    2025250     91400   17.6100 -110.8800      13.6        62       138        60
OIR    2025250     91400   17.6100 -110.8900      13.5        62       141        60
OIR    2025250     91400   17.6100 -111.3200      19.4        55       136        60
OIR    2025250     91400   17.6100 -111.3300      19.1        55       127        60
OIR    2025250     91400   17.6100 -111.3400      18.8        55       117        60
OIR    2025250     91400   17.6100 -111.3500      18.1        55       110        60
OIR    2025250     91400   17.6100 -111.3600      17.2        56       105        60
OIR    2025250     91400   17.6100 -111.3700      16.9        56       104        60
OIR    2025250     91400   17.6100 -111.3800      16.7        56       103        60
OIR    2025250     91400   17.6100 -111.3900      16.6        56       103        60
OIR    2025250     91400   17.6100 -111.4000      16.6        55       103        60
OIR    2025250     91400   17.6100 -111.4100      16.8        55       103        60
OIR    2025250     91400   17.6100 -111.4200      16.7        55       103        60
OIR    2025250     91400   17.6100 -111.4300      16.3        55       103        60
OIR    2025250     91400   17.6100 -111.4400      15.8        57       103        60
OIR    2025250     91400   17.6100 -111.4500      15.6        57       103        60
OIR    2025250     91400   17.6100 -111.4600      15.5        57       103        60
OIR    2025250     91400   17.6100 -111.4700      15.5        57       103        60
OIR    2025250     91400   17.6100 -111.4800      15.4        57       103        60
OIR    2025250     91400   17.6100 -111.4900      15.4        57       103        60
OIR    2025250     91400   17.6100 -111.5000      15.3        56       104        60
OIR    2025250     91400   17.6100 -111.5100      15.2        54       105        60
OIR    2025250     91400   17.6100 -111.5200      15.1        52       108        60
OIR    2025250     91400   17.6100 -111.5300      14.9        50       112        60
OIR    2025250     91400   17.6100 -111.5400      14.8        50       116        60
OIR    2025250     91400   17.6100 -111.5500      14.7        49       117        60
OIR    2025250     91400   17.6100 -111.5600      14.7        49       120        60
OIR    2025250     91400   17.6100 -111.5700      14.6        49       123        60
OIR    2025250     91400   17.6100 -111.5800      14.6        50       126        60
OIR    2025250     91400   17.6100 -111.5900      14.7        50       130        60
OIR    2025250     91400   17.6100 -111.6000      14.9        50       136        60
OIR    2025250     91400   17.6100 -111.6100      14.9        48       142        60
OIR    2025250     91400   17.6100 -111.7300      15.1        48       141        60
OIR    2025250     91400   17.6100 -111.7400      15.1        48       140        60
OIR    2025250     91400   17.6100 -111.7500      15.2        48       138        60
OIR    2025250     91400   17.6100 -111.7600      15.2        48       136        60
OIR    2025250     91400   17.6100 -111.7700      15.2        48       134        60
OIR    2025250     91400   17.6100 -111.7800      15.2        48       137        60
OIR    2025250     91400   17.6100 -111.7900      15.2        48       142        60
OIR    2025250     91400   17.6100 -111.9700      14.8        47       143        60
OIR    2025250     91400   17.6100 -111.9800      14.8        47       142        60
OIR    2025250     91400   17.6100 -111.9900      14.7        47       144        60
OIR    2025250     91400   17.6100 -112.2000      14.1        39       140        60
OIR    2025250     91400   17.6100 -112.2100      13.9        37       134        60
OIR    2025250     91400   17.6100 -112.2200      13.9        36       130        60
OIR    2025250     91400   17.6100 -112.2300      13.9        36       129        60
OIR    2025250     91400   17.6100 -112.2400      13.9        36       128        60
OIR    2025250     91400   17.6100 -112.2500      13.9        36       126        60
OIR    2025250     91400   17.6100 -112.2600      13.9        36       125        60
OIR    2025250     91400   17.6100 -112.2700      13.9        36       124        60
OIR    2025250     91400   17.6100 -112.2800      13.9        35       122        60
OIR    2025250     91400   17.6100 -112.2900      14.0        35       122        60
OIR    2025250     91400   17.6100 -112.3000      14.4        31       124        60
OIR    2025250     91400   17.6100 -112.3100      14.6        29       127        60
OIR    2025250     91400   17.6100 -112.3200      15.1        25       131        60
OIR    2025250     91400   17.6100 -112.3300      15.5        22       135        60
OIR    2025250     91400   17.6100 -112.3400      15.6        22       135        60
OIR    2025250     91400   17.6100 -112.3500      15.8        23       135        60
OIR    2025250     91400   17.6100 -112.3600      16.0        23       135        60
OIR    2025250     91400   17.6100 -112.3700      16.2        23       136        60
OIR    2025250     91400   17.6100 -112.3800      16.4        23       136        60
OIR    2025250     91400   17.6100 -112.3900      16.5        23       137        60
OIR    2025250     91400   17.6100 -112.4000      16.6        23       138        60
OIR    2025250     91400   17.6100 -112.4100      16.6        24       136        60
OIR    2025250     91400   17.6100 -112.4200      16.6        24       134        60
OIR    2025250     91400   17.6100 -112.4300      16.6        24       134        60
OIR    2025250     91400   17.6100 -112.4400      16.6        24       135        60
OIR    2025250     91400   17.6100 -112.4500      16.6        24       136        60
OIR    2025250     91400   17.6100 -112.4600      16.4        24       134        60
OIR    2025250     91400   17.6100 -112.4700      16.3        24       133        60
OIR    2025250     91400   17.6100 -112.4800      16.2        25       132        60
OIR    2025250     91400   17.6100 -112.4900      16.1        25       131        60
OIR    2025250     91400   17.6100 -112.5000      16.0        25       131        60
OIR    2025250     91400   17.6100 -112.5100      16.0        25       132        60
OIR    2025250     91400   17.6100 -112.5200      16.0        25       131        60
OIR    2025250     91400   17.6100 -112.5300      15.9        25       131        60
OIR    2025250     91400   17.6100 -112.5400      15.8        25       130        60
OIR    2025250     91400   17.6100 -112.5500      15.8        25       131        60
OIR    2025250     91400   17.6100 -112.5600      15.7        24       132        60
OIR    2025250     91400   17.6100 -112.5700      15.7        24       131        60
OIR    2025250     91400   17.6100 -112.5800      15.6        24       129        60
OIR    2025250     91400   17.6100 -112.5900      15.6        24       129        60
OIR    2025250     91400   17.6100 -112.6000      15.6        24       130        60
OIR    2025250     91400   17.6100 -112.6100      15.5        24       130        60
OIR    2025250     91400   17.6100 -112.6200      15.5        23       132        60
OIR    2025250     91400   17.6100 -112.6300      15.4        23       133        60
OIR    2025250     91400   17.6100 -112.6400      15.4        23       131        60
OIR    2025250     91400   17.6100 -112.6500      15.3        23       129        60
OIR    2025250     91400   17.6100 -112.6600      15.3        23       128        60
OIR    2025250     91400   17.6100 -112.6700      15.2        22       128        60
OIR    2025250     91400   17.6100 -112.6800      15.1        22       128        60
OIR    2025250     91400   17.6100 -112.6900      15.0        23       129        60
OIR    2025250     91400   17.6100 -112.7000      14.9        23       130        60
OIR    2025250     91400   17.6100 -112.7100      14.7        23       133        60
OIR    2025250     91400   17.6100 -112.7200      14.6        24       135        60
OIR    2025250     91400   17.6100 -112.7300      14.5        24       136        60
OIR    2025250     91400   17.6100 -112.7400      14.5        24       135        60
OIR    2025250     91400   17.6100 -112.7500      14.4        24       134        60
OIR    2025250     91400   17.6100 -112.7600      14.3        24       136        60
OIR    2025250     91400   17.6100 -112.7700      14.3        24       138        60
OIR    2025250     91400   17.6100 -112.7800      14.1        24       138        60
OIR    2025250     91400   17.6100 -112.7900      13.9        24       137        60
OIR    2025250     91400   17.6100 -112.8000      13.6        25       137        60
OIR    2025250     91400   17.6100 -112.8100      13.2        25       137        60
OIR    2025250     91400   17.6100 -112.8200      12.8        26       137        60
OIR    2025250     91400   17.6100 -112.8300      12.3        26       137        60
OIR    2025250     91400   17.6100 -112.8400      11.7        26       137        60
OIR    2025250     91400   17.6100 -112.8500      11.2        26       138        60
OIR    2025250     91400   17.6100 -112.8600      11.0        26       139        60
OIR    2025250     91400   17.6100 -112.8700      10.7        26       140        60
OIR    2025250     91400   17.6100 -112.8800      10.3        27       139        60
OIR    2025250     91400   17.6100 -112.8900      10.1        27       139        60
OIR    2025250     91400   17.6100 -112.9000      10.1        26       138        60
OIR    2025250     91400   17.6100 -112.9100      10.1        26       137        60
OIR    2025250     91400   17.6100 -112.9200      10.0        26       136        60
OIR    2025250     91400   17.6100 -112.9300      10.0        26       135        60
OIR    2025250     91400   17.6100 -112.9400      10.1        26       134        60
OIR    2025250     91400   17.6100 -112.9500      10.2        25       132        60
OIR    2025250     91400   17.6100 -112.9600      10.5        24       132        60
OIR    2025250     91400   17.6100 -112.9700      10.8        23       131        60
OIR    2025250     91400   17.6100 -112.9800      11.1        23       130        60
OIR    2025250     91400   17.6100 -112.9900      11.2        22       130        60
OIR    2025250     91400   17.6100 -113.0000      11.2        22       130        60
OIR    2025250     91400   17.6100 -113.0100      11.2        22       132        60
OIR    2025250     91400   17.6100 -113.0200      11.1        22       134        60
OIR    2025250     91400   17.6100 -113.0300      11.1        22       135        60
OIR    2025250     91400   17.6100 -113.0400      11.1        22       135        60
OIR    2025250     91400   17.6100 -113.0500      11.1        22       135        60
OIR    2025250     91400   17.6100 -113.0600      11.0        22       133        60
OIR    2025250     91400   17.6100 -113.0700      10.8        22       132        60
OIR    2025250     91400   17.6100 -113.0800      10.5        22       134        60
OIR    2025250     91400   17.6100 -113.0900      10.2        22       135        60
OIR    2025250     91400   17.6100 -113.1000       9.9        21       135        60
OIR    2025250     91400   17.6100 -113.1100       9.8        20       135        60
OIR    2025250     91400   17.6100 -113.1200       9.7        19       134        60
OIR    2025250     91400   17.6100 -113.1300       9.7        17       134        60
OIR    2025250     91400   17.6100 -113.1400       9.7        16       134        60
OIR    2025250     91400   17.6100 -113.1500       9.7        15       137        60
OIR    2025250     91400   17.6100 -113.1600       9.7        15       139        60
OIR    2025250     91400   17.6100 -113.1700       9.7        15       139        60
OIR    2025250     91400   17.6100 -113.1800       9.7        15       139        60
OIR    2025250     91400   17.6100 -113.1900       9.7        15       138        60
OIR    2025250     91400   17.6100 -113.2000       9.7        15       136        60
OIR    2025250     91400   17.6100 -113.2100       9.7        15       135        60
OIR    2025250     91400   17.6100 -113.2200       9.7        15       138        60
OIR    2025250     91400   17.6100 -113.2300       9.7        15       141        60
OIR    2025250     91400   17.6100 -113.2400       9.8        14       139        60
OIR    2025250     91400   17.6100 -113.2500       9.8        14       137        60
OIR    2025250     91400   17.6100 -113.2600      10.1        14       138        60
OIR    2025250     91400   17.6100 -113.2700      10.3        13       140        60
OIR    2025250     91400   17.6100 -113.2800      10.4        14       141        60
OIR    2025250     91400   17.6100 -113.2900      10.4        14       142        60
OIR    2025250     91400   17.6100 -113.3000      10.4        14       143        60
OIR    2025250     91400   17.6100 -113.3100      10.4        15       143        60
OIR    2025250     91400   17.6100 -113.3200      10.4        16       144        60
OIR    2025250     91400   17.6100 -113.3300      10.4        16       142        60
OIR    2025250     91400   17.6100 -113.3400      10.5        17       141        60
OIR    2025250     91400   17.6100 -113.3500      10.6        17       138        60
OIR    2025250     91400   17.6100 -113.3600      10.7        18       136        60
OIR    2025250     91400   17.6100 -113.3700      10.9        19       136        60
OIR    2025250     91400   17.6100 -113.3800      11.0        20       139        60
OIR    2025250     91400   17.6100 -113.3900      11.1        20       141        60
OIR    2025250     91400   17.6100 -113.4000      11.2        20       139        60
OIR    2025250     91400   17.6100 -113.4100      11.2        20       136        60
OIR    2025250     91400   17.6100 -113.4200      11.2        20       136        60
OIR    2025250     91400   17.6100 -113.4300      11.2        20       137        60
OIR    2025250     91400   17.6100 -113.4400      11.3        20       138        60
OIR    2025250     91400   17.6100 -113.4500      11.3        20       141        60
OIR    2025250     91400   17.6100 -113.4600      11.3        20       143        60
OIR    2025250     91400   17.6100 -113.4700      11.3        20       143        60
OIR    2025250     91400   17.6100 -113.4800      11.3        20       143        60
OIR    2025250     91400   17.6100 -113.6100      11.1        16       144        60
OIR    2025250     91400   17.6100 -113.6200      11.0        15       144        60
OIR    2025250     91400   17.6100 -113.7000       9.7         4       144        60
OIR    2025250     91400   17.6100 -113.7100       9.1         2       144        60
OIR    2025250     91400   17.6100 -113.7500       8.6       360       144        60
OIR    2025250     91400   17.6100 -113.7600       8.6       360       144        60
OIR    2025250     91400   17.6100 -113.8900       7.8         0       144        60
OIR    2025250     91400   17.6100 -113.9400       7.9         0       143        60
OIR    2025250     91400   17.6100 -113.9500       8.1         0       138        60
OIR    2025250     91400   17.6100 -113.9600       8.3         0       139        60
OIR    2025250     91400   17.6100 -113.9700       8.4         0       142        60
OIR    2025250     91400   17.6000 -110.5200      16.0        54       144        60
OIR    2025250     91400   17.6000 -110.5300      15.9        54       142        60
OIR    2025250     91400   17.6000 -110.5400      15.8        55       141        60
OIR    2025250     91400   17.6000 -110.5500      15.6        56       140        60
OIR    2025250     91400   17.6000 -110.5600      15.5        57       138        60
OIR    2025250     91400   17.6000 -110.5700      15.4        57       136        60
OIR    2025250     91400   17.6000 -110.5800      15.3        58       135        60
OIR    2025250     91400   17.6000 -110.5900      15.2        58       135        60
OIR    2025250     91400   17.6000 -110.6000      15.1        59       134        60
OIR    2025250     91400   17.6000 -110.6100      15.0        59       132        60
OIR    2025250     91400   17.6000 -110.6200      14.8        60       130        60
OIR    2025250     91400   17.6000 -110.6300      14.7        61       129        60
OIR    2025250     91400   17.6000 -110.6400      14.5        62       129        60
OIR    2025250     91400   17.6000 -110.6500      14.4        62       129        60
OIR    2025250     91400   17.6000 -110.6600      14.4        62       130        60
OIR    2025250     91400   17.6000 -110.6700      14.3        63       131        60
OIR    2025250     91400   17.6000 -110.6800      14.3        63       133        60
OIR    2025250     91400   17.6000 -110.6900      14.2        63       135        60
OIR    2025250     91400   17.6000 -110.7000      14.2        63       136        60
OIR    2025250     91400   17.6000 -110.7100      14.2        63       136        60
OIR    2025250     91400   17.6000 -110.7200      14.1        63       137        60
OIR    2025250     91400   17.6000 -110.7300      14.0        63       139        60
OIR    2025250     91400   17.6000 -110.7400      14.0        63       140        60
OIR    2025250     91400   17.6000 -110.7500      13.9        62       140        60
OIR    2025250     91400   17.6000 -110.7600      13.8        62       139        60
OIR    2025250     91400   17.6000 -110.7700      13.7        62       138        60
OIR    2025250     91400   17.6000 -110.7800      13.6        62       138        60
OIR    2025250     91400   17.6000 -110.7900      13.6        62       138        60
OIR    2025250     91400   17.6000 -110.8000      13.6        62       136        60
OIR    2025250     91400   17.6000 -110.8100      13.6        62       135        60
OIR    2025250     91400   17.6000 -110.8200      13.6        62       134        60
OIR    2025250     91400   17.6000 -110.8300      13.6        62       134        60
OIR    2025250     91400   17.6000 -110.8400      13.6        62       134        60
OIR    2025250     91400   17.6000 -110.8500      13.6        62       135        60
OIR    2025250     91400   17.6000 -110.8600      13.6        62       136        60
OIR    2025250     91400   17.6000 -110.8700      13.5        62       137        60
OIR    2025250     91400   17.6000 -110.8800      13.5        62       139        60
OIR    2025250     91400   17.6000 -110.8900      13.5        62       142        60
OIR    2025250     91400   17.6000 -111.3200      19.0        55       143        60
OIR    2025250     91400   17.6000 -111.3300      18.9        54       134        60
OIR    2025250     91400   17.6000 -111.3400      18.6        54       124        60
OIR    2025250     91400   17.6000 -111.3500      18.3        54       115        60
OIR    2025250     91400   17.6000 -111.3600      17.5        55       108        60
OIR    2025250     91400   17.6000 -111.3700      17.2        54       104        60
OIR    2025250     91400   17.6000 -111.3800      17.0        54       103        60
OIR    2025250     91400   17.6000 -111.3900      16.9        54       103        60
OIR    2025250     91400   17.6000 -111.4000      17.0        54       103        60
OIR    2025250     91400   17.6000 -111.4100      17.2        53       103        60
OIR    2025250     91400   17.6000 -111.4200      17.3        52       103        60
OIR    2025250     91400   17.6000 -111.4300      17.1        53       103        60
OIR    2025250     91400   17.6000 -111.4400      16.3        55       103        60
OIR    2025250     91400   17.6000 -111.4500      15.7        57       103        60
OIR    2025250     91400   17.6000 -111.4600      15.6        57       103        60
OIR    2025250     91400   17.6000 -111.4700      15.5        57       103        60
OIR    2025250     91400   17.6000 -111.4800      15.5        57       103        60
OIR    2025250     91400   17.6000 -111.4900      15.4        56       104        60
OIR    2025250     91400   17.6000 -111.5000      15.3        55       105        60
OIR    2025250     91400   17.6000 -111.5100      15.3        55       109        60
OIR    2025250     91400   17.6000 -111.5200      15.1        54       111        60
OIR    2025250     91400   17.6000 -111.5300      14.9        51       119        60
OIR    2025250     91400   17.6000 -111.5400      14.8        49       126        60
OIR    2025250     91400   17.6000 -111.5500      14.8        48       130        60
OIR    2025250     91400   17.6000 -111.5600      14.8        48       134        60
OIR    2025250     91400   17.6000 -111.5700      14.7        48       137        60
OIR    2025250     91400   17.6000 -111.5800      14.7        49       138        60
OIR    2025250     91400   17.6000 -111.5900      14.9        48       140        60
OIR    2025250     91400   17.6000 -111.7600      15.2        48       142        60
OIR    2025250     91400   17.6000 -111.7700      15.2        48       139        60
OIR    2025250     91400   17.6000 -111.7800      15.2        48       139        60
OIR    2025250     91400   17.6000 -111.7900      15.2        48       141        60
OIR    2025250     91400   17.6000 -111.8000      15.2        48       144        60
OIR    2025250     91400   17.6000 -112.1400      14.6        47       144        60
OIR    2025250     91400   17.6000 -112.1500      14.6        46       142        60
OIR    2025250     91400   17.6000 -112.2000      14.1        40       144        60
OIR    2025250     91400   17.6000 -112.2100      13.9        37       136        60
OIR    2025250     91400   17.6000 -112.2200      13.9        37       129        60
OIR    2025250     91400   17.6000 -112.2300      13.9        36       127        60
OIR    2025250     91400   17.6000 -112.2400      13.9        36       126        60
OIR    2025250     91400   17.6000 -112.2500      13.9        36       125        60
OIR    2025250     91400   17.6000 -112.2600      13.9        36       123        60
OIR    2025250     91400   17.6000 -112.2700      13.9        35       122        60
OIR    2025250     91400   17.6000 -112.2800      13.9        35       121        60
OIR    2025250     91400   17.6000 -112.2900      14.2        33       121        60
OIR    2025250     91400   17.6000 -112.3000      14.8        28       123        60
OIR    2025250     91400   17.6000 -112.3100      15.4        25       125        60
OIR    2025250     91400   17.6000 -112.3200      15.6        22       128        60
OIR    2025250     91400   17.6000 -112.3300      15.7        21       132        60
OIR    2025250     91400   17.6000 -112.3400      15.8        21       134        60
OIR    2025250     91400   17.6000 -112.3500      15.9        21       135        60
OIR    2025250     91400   17.6000 -112.3600      16.0        22       137        60
OIR    2025250     91400   17.6000 -112.3700      16.3        22       137        60
OIR    2025250     91400   17.6000 -112.3800      16.5        23       138        60
OIR    2025250     91400   17.6000 -112.3900      16.6        23       140        60
OIR    2025250     91400   17.6000 -112.4000      16.7        23       143        60
OIR    2025250     91400   17.6000 -112.4100      16.7        24       141        60
OIR    2025250     91400   17.6000 -112.4200      16.7        24       137        60
OIR    2025250     91400   17.6000 -112.4300      16.7        24       135        60
OIR    2025250     91400   17.6000 -112.4400      16.7        24       135        60
OIR    2025250     91400   17.6000 -112.4500      16.7        24       135        60
OIR    2025250     91400   17.6000 -112.4600      16.7        24       134        60
OIR    2025250     91400   17.6000 -112.4700      16.5        24       132        60
OIR    2025250     91400   17.6000 -112.4800      16.4        24       131        60
OIR    2025250     91400   17.6000 -112.4900      16.3        25       131        60
OIR    2025250     91400   17.6000 -112.5000      16.1        25       130        60
OIR    2025250     91400   17.6000 -112.5100      16.1        25       131        60
OIR    2025250     91400   17.6000 -112.5200      16.0        25       131        60
OIR    2025250     91400   17.6000 -112.5300      16.0        25       131        60
OIR    2025250     91400   17.6000 -112.5400      15.9        25       130        60
OIR    2025250     91400   17.6000 -112.5500      15.8        24       131        60
OIR    2025250     91400   17.6000 -112.5600      15.7        24       131        60
OIR    2025250     91400   17.6000 -112.5700      15.7        24       131        60
OIR    2025250     91400   17.6000 -112.5800      15.6        24       130        60
OIR    2025250     91400   17.6000 -112.5900      15.6        24       129        60
OIR    2025250     91400   17.6000 -112.6000      15.6        24       129        60
OIR    2025250     91400   17.6000 -112.6100      15.6        24       129        60
OIR    2025250     91400   17.6000 -112.6200      15.5        23       130        60
OIR    2025250     91400   17.6000 -112.6300      15.4        23       130        60
OIR    2025250     91400   17.6000 -112.6400      15.4        23       129        60
OIR    2025250     91400   17.6000 -112.6500      15.4        23       127        60
OIR    2025250     91400   17.6000 -112.6600      15.3        23       127        60
OIR    2025250     91400   17.6000 -112.6700      15.2        23       127        60
OIR    2025250     91400   17.6000 -112.6800      15.1        23       128        60
OIR    2025250     91400   17.6000 -112.6900      15.0        23       129        60
OIR    2025250     91400   17.6000 -112.7000      14.8        24       130        60
OIR    2025250     91400   17.6000 -112.7100      14.7        24       133        60
OIR    2025250     91400   17.6000 -112.7200      14.6        24       136        60
OIR    2025250     91400   17.6000 -112.7300      14.6        24       137        60
OIR    2025250     91400   17.6000 -112.7400      14.5        24       135        60
OIR    2025250     91400   17.6000 -112.7500      14.5        24       133        60
OIR    2025250     91400   17.6000 -112.7600      14.4        24       135        60
OIR    2025250     91400   17.6000 -112.7700      14.4        24       137        60
OIR    2025250     91400   17.6000 -112.7800      14.3        24       138        60
OIR    2025250     91400   17.6000 -112.7900      14.2        24       138        60
OIR    2025250     91400   17.6000 -112.8000      14.1        25       138        60
OIR    2025250     91400   17.6000 -112.8100      13.9        25       139        60
OIR    2025250     91400   17.6000 -112.8200      13.7        25       139        60
OIR    2025250     91400   17.6000 -112.8300      13.4        25       138        60
OIR    2025250     91400   17.6000 -112.8400      13.2        25       138        60
OIR    2025250     91400   17.6000 -112.8500      12.9        25       138        60
OIR    2025250     91400   17.6000 -112.8600      12.8        26       138        60
OIR    2025250     91400   17.6000 -112.8700      12.4        26       139        60
OIR    2025250     91400   17.6000 -112.8800      11.8        26       141        60
OIR    2025250     91400   17.6000 -112.8900      11.3        26       143        60
OIR    2025250     91400   17.6000 -112.9000      11.0        26       143        60
OIR    2025250     91400   17.6000 -112.9100      10.9        26       142        60
OIR    2025250     91400   17.6000 -112.9200      10.9        25       141        60
OIR    2025250     91400   17.6000 -112.9300      11.0        25       139        60
OIR    2025250     91400   17.6000 -112.9400      10.9        25       137        60
OIR    2025250     91400   17.6000 -112.9500      10.9        25       134        60
OIR    2025250     91400   17.6000 -112.9600      10.9        24       132        60
OIR    2025250     91400   17.6000 -112.9700      11.0        23       132        60
OIR    2025250     91400   17.6000 -112.9800      11.2        23       131        60
OIR    2025250     91400   17.6000 -112.9900      11.2        22       132        60
OIR    2025250     91400   17.6000 -113.0000      11.2        22       132        60
OIR    2025250     91400   17.6000 -113.0100      11.2        22       133        60
OIR    2025250     91400   17.6000 -113.0200      11.2        22       135        60
OIR    2025250     91400   17.6000 -113.0300      11.1        22       136        60
OIR    2025250     91400   17.6000 -113.0400      11.1        22       139        60
OIR    2025250     91400   17.6000 -113.0500      11.1        22       139        60
OIR    2025250     91400   17.6000 -113.0600      11.1        22       137        60
OIR    2025250     91400   17.6000 -113.0700      11.0        22       135        60
OIR    2025250     91400   17.6000 -113.0800      10.7        22       135        60
OIR    2025250     91400   17.6000 -113.0900      10.5        21       135        60
OIR    2025250     91400   17.6000 -113.1000      10.2        21       135        60
OIR    2025250     91400   17.6000 -113.1100      10.1        20       134        60
OIR    2025250     91400   17.6000 -113.1200       9.9        18       134        60
OIR    2025250     91400   17.6000 -113.1300       9.8        17       135        60
OIR    2025250     91400   17.6000 -113.1400       9.8        16       136        60
OIR    2025250     91400   17.6000 -113.1500       9.8        15       137        60
OIR    2025250     91400   17.6000 -113.1600       9.7        15       138        60
OIR    2025250     91400   17.6000 -113.1700       9.7        15       137        60
OIR    2025250     91400   17.6000 -113.1800       9.7        15       136        60
OIR    2025250     91400   17.6000 -113.1900       9.7        15       135        60
OIR    2025250     91400   17.6000 -113.2000       9.7        15       133        60
OIR    2025250     91400   17.6000 -113.2100       9.7        15       131        60
OIR    2025250     91400   17.6000 -113.2200       9.8        15       134        60
OIR    2025250     91400   17.6000 -113.2300       9.8        15       137        60
OIR    2025250     91400   17.6000 -113.2400       9.8        15       138        60
OIR    2025250     91400   17.6000 -113.2500       9.9        14       138        60
OIR    2025250     91400   17.6000 -113.2600      10.3        13       140        60
OIR    2025250     91400   17.6000 -113.2700      10.4        13       143        60
OIR    2025250     91400   17.6000 -113.3100      10.5        14       144        60
OIR    2025250     91400   17.6000 -113.3200      10.5        15       143        60
OIR    2025250     91400   17.6000 -113.3300      10.5        16       142        60
OIR    2025250     91400   17.6000 -113.3400      10.6        17       141        60
OIR    2025250     91400   17.6000 -113.3500      10.7        17       139        60
OIR    2025250     91400   17.6000 -113.3600      10.9        18       137        60
OIR    2025250     91400   17.6000 -113.3700      11.0        19       136        60
OIR    2025250     91400   17.6000 -113.3800      11.1        20       140        60
OIR    2025250     91400   17.6000 -113.3900      11.2        20       144        60
OIR    2025250     91400   17.6000 -113.4000      11.3        20       140        60
OIR    2025250     91400   17.6000 -113.4100      11.3        20       136        60
OIR    2025250     91400   17.6000 -113.4200      11.3        21       136        60
OIR    2025250     91400   17.6000 -113.4300      11.3        21       136        60
OIR    2025250     91400   17.6000 -113.4400      11.4        21       137        60
OIR    2025250     91400   17.6000 -113.4500      11.4        21       139        60
OIR    2025250     91400   17.6000 -113.4600      11.4        21       141        60
OIR    2025250     91400   17.6000 -113.4700      11.4        20       143        60
OIR    2025250     91400   17.6000 -113.6000      11.3        16       144        60
OIR    2025250     91400   17.6000 -113.6100      11.2        16       142        60
OIR    2025250     91400   17.6000 -113.6200      11.1        15       141        60
OIR    2025250     91400   17.6000 -113.6300      11.0        14       144        60
OIR    2025250     91400   17.6000 -113.6600      10.6        10       142        60
OIR    2025250     91400   17.6000 -113.6700      10.6        10       142        60
OIR    2025250     91400   17.6000 -113.6800      10.5         9       143        60
OIR    2025250     91400   17.6000 -113.6900      10.5         8       144        60
OIR    2025250     91400   17.6000 -113.9600       8.5       360       144        60
OIR    2025250     91400   17.5900 -110.4700      16.4        53       144        60
OIR    2025250     91400   17.5900 -110.4800      16.2        53       143        60
OIR    2025250     91400   17.5900 -110.4900      16.1        53       142        60
OIR    2025250     91400   17.5900 -110.5000      16.1        54       141        60
OIR    2025250     91400   17.5900 -110.5100      16.0        54       141        60
OIR    2025250     91400   17.5900 -110.5200      15.9        54       140        60
OIR    2025250     91400   17.5900 -110.5300      15.8        55       140        60
OIR    2025250     91400   17.5900 -110.5400      15.6        55       140        60
OIR    2025250     91400   17.5900 -110.5500      15.4        56       140        60
OIR    2025250     91400   17.5900 -110.5600      15.3        57       137        60
OIR    2025250     91400   17.5900 -110.5700      15.3        58       135        60
OIR    2025250     91400   17.5900 -110.5800      15.2        58       134        60
OIR    2025250     91400   17.5900 -110.5900      15.1        58       135        60
OIR    2025250     91400   17.5900 -110.6000      15.0        59       136        60
OIR    2025250     91400   17.5900 -110.6100      14.9        59       135        60
OIR    2025250     91400   17.5900 -110.6200      14.7        60       133        60
OIR    2025250     91400   17.5900 -110.6300      14.6        61       132        60
OIR    2025250     91400   17.5900 -110.6400      14.4        62       132        60
OIR    2025250     91400   17.5900 -110.6500      14.3        62       132        60
OIR    2025250     91400   17.5900 -110.6600      14.2        62       134        60
OIR    2025250     91400   17.5900 -110.6700      14.2        63       136        60
OIR    2025250     91400   17.5900 -110.6800      14.1        63       137        60
OIR    2025250     91400   17.5900 -110.6900      14.1        63       137        60
OIR    2025250     91400   17.5900 -110.7000      14.1        63       138        60
OIR    2025250     91400   17.5900 -110.7100      14.0        63       139        60
OIR    2025250     91400   17.5900 -110.7200      13.9        63       139        60
OIR    2025250     91400   17.5900 -110.7300      13.8        62       140        60
OIR    2025250     91400   17.5900 -110.7400      13.8        62       140        60
OIR    2025250     91400   17.5900 -110.7500      13.7        62       140        60
OIR    2025250     91400   17.5900 -110.7600      13.7        62       140        60
OIR    2025250     91400   17.5900 -110.7700      13.6        62       140        60
OIR    2025250     91400   17.5900 -110.7800      13.6        62       139        60
OIR    2025250     91400   17.5900 -110.7900      13.6        62       138        60
OIR    2025250     91400   17.5900 -110.8000      13.6        62       137        60
OIR    2025250     91400   17.5900 -110.8100      13.6        62       136        60
OIR    2025250     91400   17.5900 -110.8200      13.6        62       136        60
OIR    2025250     91400   17.5900 -110.8300      13.6        62       135        60
OIR    2025250     91400   17.5900 -110.8400      13.6        62       136        60
OIR    2025250     91400   17.5900 -110.8500      13.5        62       137        60
OIR    2025250     91400   17.5900 -110.8600      13.5        62       137        60
OIR    2025250     91400   17.5900 -110.8700      13.5        62       139        60
OIR    2025250     91400   17.5900 -110.8800      13.5        62       142        60
OIR    2025250     91400   17.5900 -111.3300      18.6        54       136        60
OIR    2025250     91400   17.5900 -111.3400      18.5        54       126        60
OIR    2025250     91400   17.5900 -111.3500      18.2        54       116        60
OIR    2025250     91400   17.5900 -111.3600      17.7        54       111        60
OIR    2025250     91400   17.5900 -111.3700      17.3        54       107        60
OIR    2025250     91400   17.5900 -111.3800      17.1        53       103        60
OIR    2025250     91400   17.5900 -111.3900      17.2        52       103        60
OIR    2025250     91400   17.5900 -111.4000      17.5        50       103        60
OIR    2025250     91400   17.5900 -111.4100      17.8        49       103        60
OIR    2025250     91400   17.5900 -111.4200      17.8        50       103        60
OIR    2025250     91400   17.5900 -111.4300      17.5        51       103        60
OIR    2025250     91400   17.5900 -111.4400      17.0        53       103        60
OIR    2025250     91400   17.5900 -111.4500      15.8        56       103        60
OIR    2025250     91400   17.5900 -111.4600      15.7        57       103        60
OIR    2025250     91400   17.5900 -111.4700      15.6        57       104        60
OIR    2025250     91400   17.5900 -111.4800      15.6        57       107        60
OIR    2025250     91400   17.5900 -111.4900      15.5        56       112        60
OIR    2025250     91400   17.5900 -111.5000      15.4        55       116        60
OIR    2025250     91400   17.5900 -111.5100      15.4        54       122        60
OIR    2025250     91400   17.5900 -111.5200      15.3        52       126        60
OIR    2025250     91400   17.5900 -111.5300      15.2        50       132        60
OIR    2025250     91400   17.5900 -111.5400      15.0        48       138        60
OIR    2025250     91400   17.5900 -111.5500      14.9        47       141        60
OIR    2025250     91400   17.5900 -111.5600      14.8        47       141        60
OIR    2025250     91400   17.5900 -111.5700      14.8        48       142        60
OIR    2025250     91400   17.5900 -111.5800      14.8        48       141        60
OIR    2025250     91400   17.5900 -111.5900      14.9        48       141        60
OIR    2025250     91400   17.5900 -111.7700      15.2        48       144        60
OIR    2025250     91400   17.5900 -111.7800      15.2        48       142        60
OIR    2025250     91400   17.5900 -111.7900      15.2        48       142        60
OIR    2025250     91400   17.5900 -111.8000      15.2        48       142        60
OIR    2025250     91400   17.5900 -112.1500      14.6        47       143        60
OIR    2025250     91400   17.5900 -112.1600      14.6        46       144        60
OIR    2025250     91400   17.5900 -112.2000      14.1        41       143        60
OIR    2025250     91400   17.5900 -112.2100      13.9        39       137        60
OIR    2025250     91400   17.5900 -112.2200      13.9        37       130        60
OIR    2025250     91400   17.5900 -112.2300      13.9        37       128        60
OIR    2025250     91400   17.5900 -112.2400      13.8        36       126        60
OIR    2025250     91400   17.5900 -112.2500      13.8        36       124        60
OIR    2025250     91400   17.5900 -112.2600      13.8        36       122        60
OIR    2025250     91400   17.5900 -112.2700      13.8        35       121        60
OIR    2025250     91400   17.5900 -112.2800      13.9        35       121        60
OIR    2025250     91400   17.5900 -112.2900      14.1        32       121        60
OIR    2025250     91400   17.5900 -112.3000      14.9        27       123        60
OIR    2025250     91400   17.5900 -112.3100      15.5        24       125        60
OIR    2025250     91400   17.5900 -112.3200      15.7        21       127        60
OIR    2025250     91400   17.5900 -112.3300      15.8        21       130        60
OIR    2025250     91400   17.5900 -112.3400      15.8        21       133        60
OIR    2025250     91400   17.5900 -112.3500      15.9        21       137        60
OIR    2025250     91400   17.5900 -112.3600      16.0        21       139        60
OIR    2025250     91400   17.5900 -112.3700      16.3        22       139        60
OIR    2025250     91400   17.5900 -112.3800      16.5        22       139        60
OIR    2025250     91400   17.5900 -112.3900      16.7        23       141        60
OIR    2025250     91400   17.5900 -112.4000      16.7        23       144        60
OIR    2025250     91400   17.5900 -112.4100      16.8        24       144        60
OIR    2025250     91400   17.5900 -112.4200      16.8        24       140        60
OIR    2025250     91400   17.5900 -112.4300      16.8        24       137        60
OIR    2025250     91400   17.5900 -112.4400      16.8        24       136        60
OIR    2025250     91400   17.5900 -112.4500      16.8        24       135        60
OIR    2025250     91400   17.5900 -112.4600      16.8        24       133        60
OIR    2025250     91400   17.5900 -112.4700      16.7        24       132        60
OIR    2025250     91400   17.5900 -112.4800      16.6        24       131        60
OIR    2025250     91400   17.5900 -112.4900      16.5        24       130        60
OIR    2025250     91400   17.5900 -112.5000      16.3        24       130        60
OIR    2025250     91400   17.5900 -112.5100      16.2        24       130        60
OIR    2025250     91400   17.5900 -112.5200      16.1        25       131        60
OIR    2025250     91400   17.5900 -112.5300      16.0        25       130        60
OIR    2025250     91400   17.5900 -112.5400      15.9        25       130        60
OIR    2025250     91400   17.5900 -112.5500      15.8        24       130        60
OIR    2025250     91400   17.5900 -112.5600      15.7        24       131        60
OIR    2025250     91400   17.5900 -112.5700      15.7        24       131        60
OIR    2025250     91400   17.5900 -112.5800      15.6        24       131        60
OIR    2025250     91400   17.5900 -112.5900      15.6        24       130        60
OIR    2025250     91400   17.5900 -112.6000      15.6        24       129        60
OIR    2025250     91400   17.5900 -112.6100      15.6        24       129        60
OIR    2025250     91400   17.5900 -112.6200      15.5        24       128        60
OIR    2025250     91400   17.5900 -112.6300      15.4        23       127        60
OIR    2025250     91400   17.5900 -112.6400      15.4        23       127        60
OIR    2025250     91400   17.5900 -112.6500      15.3        23       127        60
OIR    2025250     91400   17.5900 -112.6600      15.2        23       127        60
OIR    2025250     91400   17.5900 -112.6700      15.1        23       127        60
OIR    2025250     91400   17.5900 -112.6800      15.0        23       127        60
OIR    2025250     91400   17.5900 -112.6900      14.9        24       128        60
OIR    2025250     91400   17.5900 -112.7000      14.8        24       130        60
OIR    2025250     91400   17.5900 -112.7100      14.7        24       132        60
OIR    2025250     91400   17.5900 -112.7200      14.6        24       137        60
OIR    2025250     91400   17.5900 -112.7300      14.6        24       139        60
OIR    2025250     91400   17.5900 -112.7400      14.5        24       136        60
OIR    2025250     91400   17.5900 -112.7500      14.5        24       133        60
OIR    2025250     91400   17.5900 -112.7600      14.5        24       135        60
OIR    2025250     91400   17.5900 -112.7700      14.4        24       136        60
OIR    2025250     91400   17.5900 -112.7800      14.4        24       138        60
OIR    2025250     91400   17.5900 -112.7900      14.3        24       140        60
OIR    2025250     91400   17.5900 -112.8000      14.2        24       141        60
OIR    2025250     91400   17.5900 -112.8100      14.2        25       142        60
OIR    2025250     91400   17.5900 -112.8200      14.1        25       143        60
OIR    2025250     91400   17.5900 -112.8300      14.1        25       143        60
OIR    2025250     91400   17.5900 -112.8400      14.0        25       142        60
OIR    2025250     91400   17.5900 -112.8500      14.0        25       141        60
OIR    2025250     91400   17.5900 -112.8600      14.0        25       140        60
OIR    2025250     91400   17.5900 -112.8700      13.9        25       140        60
OIR    2025250     91400   17.5900 -112.8800      13.8        25       142        60
OIR    2025250     91400   17.5900 -112.9200      12.1        25       142        60
OIR    2025250     91400   17.5900 -112.9300      11.7        25       140        60
OIR    2025250     91400   17.5900 -112.9400      11.5        25       138        60
OIR    2025250     91400   17.5900 -112.9500      11.4        24       136        60
OIR    2025250     91400   17.5900 -112.9600      11.4        24       134        60
OIR    2025250     91400   17.5900 -112.9700      11.3        24       134        60
OIR    2025250     91400   17.5900 -112.9800      11.4        23       133        60
OIR    2025250     91400   17.5900 -112.9900      11.4        23       135        60
OIR    2025250     91400   17.5900 -113.0000      11.3        22       136        60
OIR    2025250     91400   17.5900 -113.0100      11.3        22       138        60
OIR    2025250     91400   17.5900 -113.0200      11.2        22       138        60
OIR    2025250     91400   17.5900 -113.0300      11.2        22       139        60
OIR    2025250     91400   17.5900 -113.0400      11.1        22       141        60
OIR    2025250     91400   17.5900 -113.0500      11.1        22       142        60
OIR    2025250     91400   17.5900 -113.0600      11.1        22       141        60
OIR    2025250     91400   17.5900 -113.0700      11.1        22       140        60
OIR    2025250     91400   17.5900 -113.0800      11.0        22       138        60
OIR    2025250     91400   17.5900 -113.0900      10.7        22       137        60
OIR    2025250     91400   17.5900 -113.1000      10.5        21       136        60
OIR    2025250     91400   17.5900 -113.1100      10.3        20       135        60
OIR    2025250     91400   17.5900 -113.1200      10.1        19       134        60
OIR    2025250     91400   17.5900 -113.1300      10.0        17       136        60
OIR    2025250     91400   17.5900 -113.1400       9.9        16       138        60
OIR    2025250     91400   17.5900 -113.1500       9.8        15       138        60
OIR    2025250     91400   17.5900 -113.1600       9.8        15       137        60
OIR    2025250     91400   17.5900 -113.1700       9.8        15       135        60
OIR    2025250     91400   17.5900 -113.1800       9.7        15       134        60
OIR    2025250     91400   17.5900 -113.1900       9.7        15       132        60
OIR    2025250     91400   17.5900 -113.2000       9.7        15       130        60
OIR    2025250     91400   17.5900 -113.2100       9.8        15       129        60
OIR    2025250     91400   17.5900 -113.2200       9.8        15       130        60
OIR    2025250     91400   17.5900 -113.2300       9.8        15       133        60
OIR    2025250     91400   17.5900 -113.2400       9.9        15       135        60
OIR    2025250     91400   17.5900 -113.2500      10.0        14       138        60
OIR    2025250     91400   17.5900 -113.2600      10.4        13       141        60
OIR    2025250     91400   17.5900 -113.3100      10.5        14       144        60
OIR    2025250     91400   17.5900 -113.3200      10.5        15       142        60
OIR    2025250     91400   17.5900 -113.3300      10.5        16       141        60
OIR    2025250     91400   17.5900 -113.3400      10.7        16       140        60
OIR    2025250     91400   17.5900 -113.3500      10.8        17       139        60
OIR    2025250     91400   17.5900 -113.3600      11.1        18       138        60
OIR    2025250     91400   17.5900 -113.3700      11.3        19       137        60
OIR    2025250     91400   17.5900 -113.3800      11.4        20       141        60
OIR    2025250     91400   17.5900 -113.4000      11.6        21       142        60
OIR    2025250     91400   17.5900 -113.4100      11.6        21       137        60
OIR    2025250     91400   17.5900 -113.4200      11.6        21       137        60
OIR    2025250     91400   17.5900 -113.4300      11.7        21       140        60
OIR    2025250     91400   17.5900 -113.4400      11.6        21       142        60
OIR    2025250     91400   17.5900 -113.4500      11.6        21       142        60
OIR    2025250     91400   17.5900 -113.4600      11.6        21       142        60
OIR    2025250     91400   17.5900 -113.4700      11.6        21       140        60
OIR    2025250     91400   17.5900 -113.4800      11.5        21       139        60
OIR    2025250     91400   17.5900 -113.4900      11.5        20       140        60
OIR    2025250     91400   17.5900 -113.6000      11.4        16       143        60
OIR    2025250     91400   17.5900 -113.6100      11.3        16       143        60
OIR    2025250     91400   17.5900 -113.6200      11.3        15       143        60
OIR    2025250     91400   17.5900 -113.6600      10.8        11       144        60
OIR    2025250     91400   17.5900 -113.6700      10.8        10       143        60
OIR    2025250     91400   17.5900 -113.6800      10.8         9       144        60
OIR    2025250     91400   17.5900 -113.6900      10.9         9       144        60
OIR    2025250     91400   17.5900 -113.7000      10.9         8       143        60
OIR    2025250     91400   17.5900 -113.7100      10.5         7       142        60
OIR    2025250     91400   17.5900 -113.7200      10.3         6       143        60
OIR    2025250     91400   17.5900 -114.0300       8.9       358       141        60
OIR    2025250     91400   17.5900 -114.0400       8.9       358       143        60
OIR    2025250     91400   17.5900 -114.0500       8.9       358       144        60
OIR    2025250     91400   17.5800 -110.4600      17.3        50       144        60
OIR    2025250     91400   17.5800 -110.4900      16.1        53       144        60
OIR    2025250     91400   17.5800 -110.5000      16.1        54       143        60
OIR    2025250     91400   17.5800 -110.5100      15.9        54       142        60
OIR    2025250     91400   17.5800 -110.5200      15.8        54       142        60
OIR    2025250     91400   17.5800 -110.5300      15.6        55       142        60
OIR    2025250     91400   17.5800 -110.5400      15.4        56       142        60
OIR    2025250     91400   17.5800 -110.5500      15.3        56       141        60
OIR    2025250     91400   17.5800 -110.5600      15.2        57       140        60
OIR    2025250     91400   17.5800 -110.5700      15.1        58       137        60
OIR    2025250     91400   17.5800 -110.5800      15.1        58       135        60
OIR    2025250     91400   17.5800 -110.5900      15.0        58       136        60
OIR    2025250     91400   17.5800 -110.6000      14.9        59       137        60
OIR    2025250     91400   17.5800 -110.6100      14.8        59       137        60
OIR    2025250     91400   17.5800 -110.6200      14.7        60       137        60
OIR    2025250     91400   17.5800 -110.6300      14.5        61       136        60
OIR    2025250     91400   17.5800 -110.6400      14.3        62       136        60
OIR    2025250     91400   17.5800 -110.6500      14.2        62       137        60
OIR    2025250     91400   17.5800 -110.6600      14.2        62       138        60
OIR    2025250     91400   17.5800 -110.6700      14.1        63       139        60
OIR    2025250     91400   17.5800 -110.6800      14.0        63       140        60
OIR    2025250     91400   17.5800 -110.6900      14.0        63       140        60
OIR    2025250     91400   17.5800 -110.7000      13.9        63       139        60
OIR    2025250     91400   17.5800 -110.7100      13.8        63       140        60
OIR    2025250     91400   17.5800 -110.7200      13.7        62       140        60
OIR    2025250     91400   17.5800 -110.7300      13.7        62       140        60
OIR    2025250     91400   17.5800 -110.7400      13.7        62       139        60
OIR    2025250     91400   17.5800 -110.7500      13.6        62       139        60
OIR    2025250     91400   17.5800 -110.7600      13.6        62       140        60
OIR    2025250     91400   17.5800 -110.7700      13.6        62       141        60
OIR    2025250     91400   17.5800 -110.7800      13.6        62       139        60
OIR    2025250     91400   17.5800 -110.7900      13.6        62       138        60
OIR    2025250     91400   17.5800 -110.8000      13.6        62       138        60
OIR    2025250     91400   17.5800 -110.8100      13.5        62       137        60
OIR    2025250     91400   17.5800 -110.8200      13.5        62       137        60
OIR    2025250     91400   17.5800 -110.8300      13.5        62       137        60
OIR    2025250     91400   17.5800 -110.8400      13.5        62       137        60
OIR    2025250     91400   17.5800 -110.8500      13.5        62       138        60
OIR    2025250     91400   17.5800 -110.8600      13.5        62       139        60
OIR    2025250     91400   17.5800 -110.8700      13.5        62       141        60
OIR    2025250     91400   17.5800 -111.3300      18.3        54       142        60
OIR    2025250     91400   17.5800 -111.3400      18.3        54       134        60
OIR    2025250     91400   17.5800 -111.3500      18.0        54       126        60
OIR    2025250     91400   17.5800 -111.3600      17.8        53       120        60
OIR    2025250     91400   17.5800 -111.3700      17.5        52       115        60
OIR    2025250     91400   17.5800 -111.3800      17.5        51       110        60
OIR    2025250     91400   17.5800 -111.3900      17.6        50       109        60
OIR    2025250     91400   17.5800 -111.4000      17.9        48       109        60
OIR    2025250     91400   17.5800 -111.4100      18.0        49       107        60
OIR    2025250     91400   17.5800 -111.4200      17.9        49       104        60
OIR    2025250     91400   17.5800 -111.4300      17.8        50       104        60
OIR    2025250     91400   17.5800 -111.4400      17.3        52       104        60
OIR    2025250     91400   17.5800 -111.4500      16.6        53       104        60
OIR    2025250     91400   17.5800 -111.4600      16.2        54       104        60
OIR    2025250     91400   17.5800 -111.4700      15.9        56       105        60
OIR    2025250     91400   17.5800 -111.4800      15.7        57       109        60
OIR    2025250     91400   17.5800 -111.4900      15.6        56       117        60
OIR    2025250     91400   17.5800 -111.5000      15.5        53       127        60
OIR    2025250     91400   17.5800 -111.5100      15.5        49       133        60
OIR    2025250     91400   17.5800 -111.5200      15.5        47       140        60
OIR    2025250     91400   17.5800 -111.5800      15.0        48       143        60
OIR    2025250     91400   17.5800 -111.5900      15.0        48       140        60
OIR    2025250     91400   17.5800 -111.7800      15.2        48       143        60
OIR    2025250     91400   17.5800 -111.7900      15.2        48       143        60
OIR    2025250     91400   17.5800 -111.8000      15.2        48       143        60
OIR    2025250     91400   17.5800 -112.1600      14.6        46       144        60
OIR    2025250     91400   17.5800 -112.1700      14.6        46       143        60
OIR    2025250     91400   17.5800 -112.1800      14.6        46       142        60
OIR    2025250     91400   17.5800 -112.1900      14.6        46       141        60
OIR    2025250     91400   17.5800 -112.2000      14.2        43       141        60
OIR    2025250     91400   17.5800 -112.2100      14.0        41       136        60
OIR    2025250     91400   17.5800 -112.2200      13.9        39       131        60
OIR    2025250     91400   17.5800 -112.2300      13.8        37       129        60
OIR    2025250     91400   17.5800 -112.2400      13.8        36       127        60
OIR    2025250     91400   17.5800 -112.2500      13.8        36       125        60
OIR    2025250     91400   17.5800 -112.2600      13.8        36       122        60
OIR    2025250     91400   17.5800 -112.2700      13.8        35       120        60
OIR    2025250     91400   17.5800 -112.2800      13.8        35       121        60
OIR    2025250     91400   17.5800 -112.2900      14.3        30       122        60
OIR    2025250     91400   17.5800 -112.3000      15.0        25       123        60
OIR    2025250     91400   17.5800 -112.3100      15.5        23       124        60
OIR    2025250     91400   17.5800 -112.3200      15.7        21       127        60
OIR    2025250     91400   17.5800 -112.3300      15.8        21       130        60
OIR    2025250     91400   17.5800 -112.3400      15.8        21       133        60
OIR    2025250     91400   17.5800 -112.3500      15.9        21       139        60
OIR    2025250     91400   17.5800 -112.3600      16.0        21       144        60
OIR    2025250     91400   17.5800 -112.3700      16.3        22       142        60
OIR    2025250     91400   17.5800 -112.3800      16.5        22       140        60
OIR    2025250     91400   17.5800 -112.3900      16.7        23       141        60
OIR    2025250     91400   17.5800 -112.4000      16.8        24       143        60
OIR    2025250     91400   17.5800 -112.4100      16.8        24       144        60
OIR    2025250     91400   17.5800 -112.4200      16.8        24       142        60
OIR    2025250     91400   17.5800 -112.4300      16.8        24       140        60
OIR    2025250     91400   17.5800 -112.4400      16.8        24       138        60
OIR    2025250     91400   17.5800 -112.4500      16.8        24       136        60
OIR    2025250     91400   17.5800 -112.4600      16.8        24       134        60
OIR    2025250     91400   17.5800 -112.4700      16.8        24       133        60
OIR    2025250     91400   17.5800 -112.4800      16.7        24       132        60
OIR    2025250     91400   17.5800 -112.4900      16.6        24       131        60
OIR    2025250     91400   17.5800 -112.5000      16.5        24       131        60
OIR    2025250     91400   17.5800 -112.5100      16.3        24       132        60
OIR    2025250     91400   17.5800 -112.5200      16.2        24       132        60
OIR    2025250     91400   17.5800 -112.5300      16.1        25       132        60
OIR    2025250     91400   17.5800 -112.5400      16.0        25       131        60
OIR    2025250     91400   17.5800 -112.5500      15.9        24       131        60
OIR    2025250     91400   17.5800 -112.5600      15.7        24       132        60
OIR    2025250     91400   17.5800 -112.5700      15.7        24       132        60
OIR    2025250     91400   17.5800 -112.5800      15.6        24       132        60
OIR    2025250     91400   17.5800 -112.5900      15.6        24       131        60
OIR    2025250     91400   17.5800 -112.6000      15.6        24       130        60
OIR    2025250     91400   17.5800 -112.6100      15.5        24       129        60
OIR    2025250     91400   17.5800 -112.6200      15.5        24       129        60
OIR    2025250     91400   17.5800 -112.6300      15.4        24       128        60
OIR    2025250     91400   17.5800 -112.6400      15.3        23       128        60
OIR    2025250     91400   17.5800 -112.6500      15.3        23       128        60
OIR    2025250     91400   17.5800 -112.6600      15.2        23       127        60
OIR    2025250     91400   17.5800 -112.6700      15.1        24       128        60
OIR    2025250     91400   17.5800 -112.6800      15.0        24       128        60
OIR    2025250     91400   17.5800 -112.6900      14.8        24       129        60
OIR    2025250     91400   17.5800 -112.7000      14.8        24       130        60
OIR    2025250     91400   17.5800 -112.7100      14.7        24       132        60
OIR    2025250     91400   17.5800 -112.7200      14.7        24       136        60
OIR    2025250     91400   17.5800 -112.7300      14.6        24       140        60
OIR    2025250     91400   17.5800 -112.7400      14.6        24       137        60
OIR    2025250     91400   17.5800 -112.7500      14.5        24       134        60
OIR    2025250     91400   17.5800 -112.7600      14.5        24       135        60
OIR    2025250     91400   17.5800 -112.7700      14.5        24       137        60
OIR    2025250     91400   17.5800 -112.7800      14.4        24       139        60
OIR    2025250     91400   17.5800 -112.7900      14.3        24       141        60
OIR    2025250     91400   17.5800 -112.8000      14.3        24       144        60
OIR    2025250     91400   17.5800 -112.8600      14.2        25       142        60
OIR    2025250     91400   17.5800 -112.8700      14.2        25       141        60
OIR    2025250     91400   17.5800 -112.8800      14.2        25       143        60
OIR    2025250     91400   17.5800 -112.9300      12.5        25       141        60
OIR    2025250     91400   17.5800 -112.9400      12.1        25       139        60
OIR    2025250     91400   17.5800 -112.9500      11.8        24       138        60
OIR    2025250     91400   17.5800 -112.9600      11.7        24       136        60
OIR    2025250     91400   17.5800 -112.9700      11.7        24       136        60
OIR    2025250     91400   17.5800 -112.9800      11.6        23       136        60
OIR    2025250     91400   17.5800 -112.9900      11.5        23       138        60
OIR    2025250     91400   17.5800 -113.0000      11.4        23       141        60
OIR    2025250     91400   17.5800 -113.0100      11.4        23       143        60
OIR    2025250     91400   17.5800 -113.0200      11.3        23       143        60
OIR    2025250     91400   17.5800 -113.0300      11.2        23       144        60
OIR    2025250     91400   17.5800 -113.0400      11.2        22       143        60
OIR    2025250     91400   17.5800 -113.0500      11.1        22       143        60
OIR    2025250     91400   17.5800 -113.0600      11.1        22       144        60
OIR    2025250     91400   17.5800 -113.0800      11.0        22       142        60
OIR    2025250     91400   17.5800 -113.0900      10.9        22       140        60
OIR    2025250     91400   17.5800 -113.1000      10.7        21       138        60
OIR    2025250     91400   17.5800 -113.1100      10.5        20       138        60
OIR    2025250     91400   17.5800 -113.1200      10.3        19       138        60
OIR    2025250     91400   17.5800 -113.1300      10.1        18       137        60
OIR    2025250     91400   17.5800 -113.1400      10.0        16       136        60
OIR    2025250     91400   17.5800 -113.1500       9.9        15       135        60
OIR    2025250     91400   17.5800 -113.1600       9.8        15       134        60
OIR    2025250     91400   17.5800 -113.1700       9.8        15       133        60
OIR    2025250     91400   17.5800 -113.1800       9.8        15       132        60
OIR    2025250     91400   17.5800 -113.1900       9.8        15       131        60
OIR    2025250     91400   17.5800 -113.2000       9.8        15       130        60
OIR    2025250     91400   17.5800 -113.2100       9.8        15       130        60
OIR    2025250     91400   17.5800 -113.2200       9.8        15       132        60
OIR    2025250     91400   17.5800 -113.2300       9.8        15       134        60
OIR    2025250     91400   17.5800 -113.2400       9.9        15       137        60
OIR    2025250     91400   17.5800 -113.2500      10.2        14       140        60
OIR    2025250     91400   17.5800 -113.2600      10.5        14       144        60
OIR    2025250     91400   17.5800 -113.3200      10.5        15       142        60
OIR    2025250     91400   17.5800 -113.3300      10.6        15       140        60
OIR    2025250     91400   17.5800 -113.3400      10.8        16       140        60
OIR    2025250     91400   17.5800 -113.3500      11.0        17       140        60
OIR    2025250     91400   17.5800 -113.3600      11.3        19       139        60
OIR    2025250     91400   17.5800 -113.3700      11.6        20       138        60
OIR    2025250     91400   17.5800 -113.3800      11.8        20       141        60
OIR    2025250     91400   17.5800 -113.3900      11.9        21       144        60
OIR    2025250     91400   17.5800 -113.4000      12.0        21       143        60
OIR    2025250     91400   17.5800 -113.4100      12.0        22       138        60
OIR    2025250     91400   17.5800 -113.4200      12.0        22       136        60
OIR    2025250     91400   17.5800 -113.4300      12.0        22       140        60
OIR    2025250     91400   17.5800 -113.4400      12.0        22       143        60
OIR    2025250     91400   17.5800 -113.4500      12.0        21       143        60
OIR    2025250     91400   17.5800 -113.4600      11.9        21       143        60
OIR    2025250     91400   17.5800 -113.4700      11.8        21       140        60
OIR    2025250     91400   17.5800 -113.4800      11.8        21       137        60
OIR    2025250     91400   17.5800 -113.4900      11.7        21       136        60
OIR    2025250     91400   17.5800 -113.5000      11.7        20       140        60
OIR    2025250     91400   17.5800 -113.6000      11.5        16       143        60
OIR    2025250     91400   17.5800 -113.6100      11.4        16       144        60
OIR    2025250     91400   17.5800 -113.7000      11.4         9       141        60
OIR    2025250     91400   17.5800 -113.7100      11.4         8       138        60
OIR    2025250     91400   17.5800 -113.7200      11.3         8       140        60
OIR    2025250     91400   17.5800 -113.7300      11.1         7       143        60
OIR    2025250     91400   17.5800 -113.7400      10.6         6       144        60
OIR    2025250     91400   17.5800 -114.0300       9.1       358       144        60
OIR    2025250     91400   17.5700 -110.4600      17.7        49       144        60
OIR    2025250     91400   17.5700 -110.5000      16.0        54       144        60
OIR    2025250     91400   17.5700 -110.5100      15.8        54       143        60
OIR    2025250     91400   17.5700 -110.5200      15.6        55       143        60
OIR    2025250     91400   17.5700 -110.5300      15.4        55       144        60
OIR    2025250     91400   17.5700 -110.5400      15.2        56       144        60
OIR    2025250     91400   17.5700 -110.5500      15.1        57       143        60
OIR    2025250     91400   17.5700 -110.5600      15.1        57       142        60
OIR    2025250     91400   17.5700 -110.5700      15.0        58       140        60
OIR    2025250     91400   17.5700 -110.5800      15.0        58       138        60
OIR    2025250     91400   17.5700 -110.5900      14.9        58       138        60
OIR    2025250     91400   17.5700 -110.6000      14.9        59       139        60
OIR    2025250     91400   17.5700 -110.6100      14.7        59       140        60
OIR    2025250     91400   17.5700 -110.6200      14.6        60       140        60
OIR    2025250     91400   17.5700 -110.6300      14.4        61       140        60
OIR    2025250     91400   17.5700 -110.6400      14.2        62       140        60
OIR    2025250     91400   17.5700 -110.6500      14.1        62       141        60
OIR    2025250     91400   17.5700 -110.6600      14.1        62       142        60
OIR    2025250     91400   17.5700 -110.6700      14.0        63       142        60
OIR    2025250     91400   17.5700 -110.6800      13.9        63       142        60
OIR    2025250     91400   17.5700 -110.6900      13.8        63       141        60
OIR    2025250     91400   17.5700 -110.7000      13.8        63       140        60
OIR    2025250     91400   17.5700 -110.7100      13.7        62       139        60
OIR    2025250     91400   17.5700 -110.7200      13.7        62       139        60
OIR    2025250     91400   17.5700 -110.7300      13.6        62       138        60
OIR    2025250     91400   17.5700 -110.7400      13.6        62       138        60
OIR    2025250     91400   17.5700 -110.7500      13.6        62       137        60
OIR    2025250     91400   17.5700 -110.7600      13.6        62       139        60
OIR    2025250     91400   17.5700 -110.7700      13.6        62       141        60
OIR    2025250     91400   17.5700 -110.7800      13.5        62       139        60
OIR    2025250     91400   17.5700 -110.7900      13.5        62       137        60
OIR    2025250     91400   17.5700 -110.8000      13.5        62       137        60
OIR    2025250     91400   17.5700 -110.8100      13.5        62       137        60
OIR    2025250     91400   17.5700 -110.8200      13.5        62       138        60
OIR    2025250     91400   17.5700 -110.8300      13.5        62       137        60
OIR    2025250     91400   17.5700 -110.8400      13.5        62       137        60
OIR    2025250     91400   17.5700 -110.8500      13.5        62       138        60
OIR    2025250     91400   17.5700 -110.8600      13.4        62       141        60
OIR    2025250     91400   17.5700 -110.8700      13.4        62       143        60
OIR    2025250     91400   17.5700 -111.3500      18.0        53       144        60
OIR    2025250     91400   17.5700 -111.3600      17.8        53       139        60
OIR    2025250     91400   17.5700 -111.3700      17.5        52       133        60
OIR    2025250     91400   17.5700 -111.3800      17.6        51       126        60
OIR    2025250     91400   17.5700 -111.3900      17.7        49       122        60
OIR    2025250     91400   17.5700 -111.4000      17.9        49       122        60
OIR    2025250     91400   17.5700 -111.4100      17.9        49       121        60
OIR    2025250     91400   17.5700 -111.4200      17.9        49       114        60
OIR    2025250     91400   17.5700 -111.4300      17.8        50       108        60
OIR    2025250     91400   17.5700 -111.4400      17.2        52       109        60
OIR    2025250     91400   17.5700 -111.4500      16.6        53       109        60
OIR    2025250     91400   17.5700 -111.4600      16.4        54       112        60
OIR    2025250     91400   17.5700 -111.4700      16.3        55       115        60
OIR    2025250     91400   17.5700 -111.4800      15.9        56       119        60
OIR    2025250     91400   17.5700 -111.4900      15.5        54       128        60
OIR    2025250     91400   17.5700 -111.5000      15.3        50       138        60
OIR    2025250     91400   17.5700 -111.5100      15.5        47       142        60
OIR    2025250     91400   17.5700 -111.5900      15.2        48       143        60
OIR    2025250     91400   17.5700 -111.7800      15.2        48       144        60
OIR    2025250     91400   17.5700 -111.7900      15.2        48       143        60
OIR    2025250     91400   17.5700 -111.8000      15.2        48       144        60
OIR    2025250     91400   17.5700 -112.1900      14.5        46       144        60
OIR    2025250     91400   17.5700 -112.2000      14.3        43       142        60
OIR    2025250     91400   17.5700 -112.2100      14.1        42       139        60
OIR    2025250     91400   17.5700 -112.2200      13.9        40       136        60
OIR    2025250     91400   17.5700 -112.2300      13.8        39       132        60
OIR    2025250     91400   17.5700 -112.2400      13.7        38       130        60
OIR    2025250     91400   17.5700 -112.2500      13.7        37       127        60
OIR    2025250     91400   17.5700 -112.2600      13.8        36       125        60
OIR    2025250     91400   17.5700 -112.2700      13.8        36       122        60
OIR    2025250     91400   17.5700 -112.2800      13.9        34       123        60
OIR    2025250     91400   17.5700 -112.2900      14.4        29       124        60
OIR    2025250     91400   17.5700 -112.3000      15.0        25       125        60
OIR    2025250     91400   17.5700 -112.3100      15.4        23       126        60
OIR    2025250     91400   17.5700 -112.3200      15.6        21       127        60
OIR    2025250     91400   17.5700 -112.3300      15.7        21       130        60
OIR    2025250     91400   17.5700 -112.3400      15.8        21       133        60
OIR    2025250     91400   17.5700 -112.3500      15.9        21       139        60
OIR    2025250     91400   17.5700 -112.3600      16.1        21       145        60
OIR    2025250     91400   17.5700 -112.3700      16.3        22       144        60
OIR    2025250     91400   17.5700 -112.3800      16.6        23       141        60
OIR    2025250     91400   17.5700 -112.3900      16.7        23       140        60
OIR    2025250     91400   17.5700 -112.4000      16.8        24       141        60
OIR    2025250     91400   17.5700 -112.4100      16.8        24       142        60
OIR    2025250     91400   17.5700 -112.4200      16.8        24       141        60
OIR    2025250     91400   17.5700 -112.4300      16.8        24       140        60
OIR    2025250     91400   17.5700 -112.4400      16.8        24       139        60
OIR    2025250     91400   17.5700 -112.4500      16.8        24       137        60
OIR    2025250     91400   17.5700 -112.4600      16.8        24       135        60
OIR    2025250     91400   17.5700 -112.4700      16.8        24       133        60
OIR    2025250     91400   17.5700 -112.4800      16.8        24       132        60
OIR    2025250     91400   17.5700 -112.4900      16.7        24       132        60
OIR    2025250     91400   17.5700 -112.5000      16.6        24       132        60
OIR    2025250     91400   17.5700 -112.5100      16.4        24       133        60
OIR    2025250     91400   17.5700 -112.5200      16.3        24       134        60
OIR    2025250     91400   17.5700 -112.5300      16.2        24       134        60
OIR    2025250     91400   17.5700 -112.5400      16.1        25       132        60
OIR    2025250     91400   17.5700 -112.5500      16.0        24       132        60
OIR    2025250     91400   17.5700 -112.5600      15.8        24       133        60
OIR    2025250     91400   17.5700 -112.5700      15.7        24       133        60
OIR    2025250     91400   17.5700 -112.5800      15.7        24       133        60
OIR    2025250     91400   17.5700 -112.5900      15.6        24       133        60
OIR    2025250     91400   17.5700 -112.6000      15.6        24       132        60
OIR    2025250     91400   17.5700 -112.6100      15.5        24       131        60
OIR    2025250     91400   17.5700 -112.6200      15.5        24       130        60
OIR    2025250     91400   17.5700 -112.6300      15.4        24       130        60
OIR    2025250     91400   17.5700 -112.6400      15.3        24       130        60
OIR    2025250     91400   17.5700 -112.6500      15.2        24       129        60
OIR    2025250     91400   17.5700 -112.6600      15.1        24       128        60
OIR    2025250     91400   17.5700 -112.6700      15.0        24       129        60
OIR    2025250     91400   17.5700 -112.6800      14.9        24       129        60
OIR    2025250     91400   17.5700 -112.6900      14.8        24       130        60
OIR    2025250     91400   17.5700 -112.7000      14.8        24       131        60
OIR    2025250     91400   17.5700 -112.7100      14.7        24       131        60
OIR    2025250     91400   17.5700 -112.7200      14.7        24       134        60
OIR    2025250     91400   17.5700 -112.7300      14.6        24       138        60
OIR    2025250     91400   17.5700 -112.7400      14.6        24       138        60
OIR    2025250     91400   17.5700 -112.7500      14.6        24       136        60
OIR    2025250     91400   17.5700 -112.7600      14.5        24       138        60
OIR    2025250     91400   17.5700 -112.7700      14.5        24       141        60
OIR    2025250     91400   17.5700 -112.7800      14.4        24       143        60
OIR    2025250     91400   17.5700 -112.7900      14.4        24       144        60
OIR    2025250     91400   17.5700 -112.8700      14.2        25       144        60
OIR    2025250     91400   17.5700 -112.9400      12.9        25       143        60
OIR    2025250     91400   17.5700 -112.9500      12.4        25       142        60
OIR    2025250     91400   17.5700 -112.9600      12.1        25       141        60
OIR    2025250     91400   17.5700 -112.9700      11.9        24       140        60
OIR    2025250     91400   17.5700 -112.9800      11.8        24       140        60
OIR    2025250     91400   17.5700 -112.9900      11.7        24       140        60
OIR    2025250     91400   17.5700 -113.0000      11.6        23       142        60
OIR    2025250     91400   17.5700 -113.0100      11.4        23       143        60
OIR    2025250     91400   17.5700 -113.0600      11.2        23       144        60
OIR    2025250     91400   17.5700 -113.0800      11.1        22       144        60
OIR    2025250     91400   17.5700 -113.0900      11.0        22       142        60
OIR    2025250     91400   17.5700 -113.1000      10.9        22       141        60
OIR    2025250     91400   17.5700 -113.1100      10.7        21       141        60
OIR    2025250     91400   17.5700 -113.1200      10.4        20       141        60
OIR    2025250     91400   17.5700 -113.1300      10.3        19       138        60
OIR    2025250     91400   17.5700 -113.1400      10.1        17       135        60
OIR    2025250     91400   17.5700 -113.1500      10.0        16       133        60
OIR    2025250     91400   17.5700 -113.1600       9.9        15       132        60
OIR    2025250     91400   17.5700 -113.1700       9.8        15       131        60
OIR    2025250     91400   17.5700 -113.1800       9.8        15       130        60
OIR    2025250     91400   17.5700 -113.1900       9.8        15       130        60
OIR    2025250     91400   17.5700 -113.2000       9.8        15       130        60
OIR    2025250     91400   17.5700 -113.2100       9.8        15       130        60
OIR    2025250     91400   17.5700 -113.2200       9.8        15       133        60
OIR    2025250     91400   17.5700 -113.2300       9.8        15       136        60
OIR    2025250     91400   17.5700 -113.2400      10.0        15       140        60
OIR    2025250     91400   17.5700 -113.2500      10.3        14       143        60
OIR    2025250     91400   17.5700 -113.3200      10.5        15       142        60
OIR    2025250     91400   17.5700 -113.3300      10.7        15       139        60
OIR    2025250     91400   17.5700 -113.3400      10.9        16       141        60
OIR    2025250     91400   17.5700 -113.3500      11.2        18       142        60
OIR    2025250     91400   17.5700 -113.3600      11.6        19       141        60
OIR    2025250     91400   17.5700 -113.3700      11.9        20       139        60
OIR    2025250     91400   17.5700 -113.3800      12.2        21       141        60
OIR    2025250     91400   17.5700 -113.3900      12.3        22       142        60
OIR    2025250     91400   17.5700 -113.4000      12.4        22       143        60
OIR    2025250     91400   17.5700 -113.4100      12.5        22       138        60
OIR    2025250     91400   17.5700 -113.4200      12.4        22       134        60
OIR    2025250     91400   17.5700 -113.4300      12.3        22       137        60
OIR    2025250     91400   17.5700 -113.4400      12.3        22       139        60
OIR    2025250     91400   17.5700 -113.4500      12.2        22       142        60
OIR    2025250     91400   17.5700 -113.4700      12.2        21       142        60
OIR    2025250     91400   17.5700 -113.4800      12.3        21       137        60
OIR    2025250     91400   17.5700 -113.4900      12.3        21       136        60
OIR    2025250     91400   17.5700 -113.5000      12.2        20       139        60
OIR    2025250     91400   17.5700 -113.5100      12.2        20       143        60
OIR    2025250     91400   17.5700 -113.6000      11.7        17       144        60
OIR    2025250     91400   17.5700 -113.6500      11.4        12       144        60
OIR    2025250     91400   17.5700 -113.7000      11.6         9       141        60
OIR    2025250     91400   17.5700 -113.7100      11.6         8       136        60
OIR    2025250     91400   17.5700 -113.7200      11.6         8       137        60
OIR    2025250     91400   17.5700 -113.7300      11.5         7       141        60
OIR    2025250     91400   17.5700 -113.7400      11.3         6       143        60
OIR    2025250     91400   17.5700 -113.9900       8.8       359       142        60
OIR    2025250     91400   17.5700 -114.0000       8.9       359       143        60
OIR    2025250     91400   17.5700 -114.0100       9.0       359       143        60
OIR    2025250     91400   17.5600 -110.5100      15.6        54       144        60
OIR    2025250     91400   17.5600 -110.5200      15.4        55       144        60
OIR    2025250     91400   17.5600 -110.5300      15.2        56       143        60
OIR    2025250     91400   17.5600 -110.5400      15.1        56       143        60
OIR    2025250     91400   17.5600 -110.5500      15.0        57       142        60
OIR    2025250     91400   17.5600 -110.5600      15.0        57       142        60
OIR    2025250     91400   17.5600 -110.5700      15.0        58       141        60
OIR    2025250     91400   17.5600 -110.5800      14.9        58       140        60
OIR    2025250     91400   17.5600 -110.5900      14.9        58       140        60
OIR    2025250     91400   17.5600 -110.6000      14.8        59       141        60
OIR    2025250     91400   17.5600 -110.6100      14.7        59       142        60
OIR    2025250     91400   17.5600 -110.6200      14.5        60       142        60
OIR    2025250     91400   17.5600 -110.6300      14.3        61       143        60
OIR    2025250     91400   17.5600 -110.6400      14.2        62       143        60
OIR    2025250     91400   17.5600 -110.6500      14.1        62       144        60
OIR    2025250     91400   17.5600 -110.6600      14.0        62       144        60
OIR    2025250     91400   17.5600 -110.6700      13.9        63       143        60
OIR    2025250     91400   17.5600 -110.6800      13.8        63       143        60
OIR    2025250     91400   17.5600 -110.6900      13.7        63       142        60
OIR    2025250     91400   17.5600 -110.7000      13.7        63       142        60
OIR    2025250     91400   17.5600 -110.7100      13.6        62       140        60
OIR    2025250     91400   17.5600 -110.7200      13.6        62       139        60
OIR    2025250     91400   17.5600 -110.7300      13.6        62       138        60
OIR    2025250     91400   17.5600 -110.7400      13.6        62       137        60
OIR    2025250     91400   17.5600 -110.7500      13.5        62       137        60
OIR    2025250     91400   17.5600 -110.7600      13.5        62       139        60
OIR    2025250     91400   17.5600 -110.7700      13.5        62       141        60
OIR    2025250     91400   17.5600 -110.7800      13.5        62       140        60
OIR    2025250     91400   17.5600 -110.7900      13.5        62       138        60
OIR    2025250     91400   17.5600 -110.8000      13.5        62       137        60
OIR    2025250     91400   17.5600 -110.8100      13.5        62       138        60
OIR    2025250     91400   17.5600 -110.8200      13.5        62       139        60
OIR    2025250     91400   17.5600 -110.8300      13.5        62       138        60
OIR    2025250     91400   17.5600 -110.8400      13.4        62       137        60
OIR    2025250     91400   17.5600 -110.8500      13.4        62       138        60
OIR    2025250     91400   17.5600 -110.8600      13.4        62       141        60
OIR    2025250     91400   17.5600 -111.3800      17.4        51       140        60
OIR    2025250     91400   17.5600 -111.3900      17.4        50       134        60
OIR    2025250     91400   17.5600 -111.4000      17.6        49       134        60
OIR    2025250     91400   17.5600 -111.4100      17.9        49       135        60
OIR    2025250     91400   17.5600 -111.4200      17.9        49       127        60
OIR    2025250     91400   17.5600 -111.4300      17.1        51       116        60
OIR    2025250     91400   17.5600 -111.4400      16.7        52       115        60
OIR    2025250     91400   17.5600 -111.4500      16.6        52       116        60
OIR    2025250     91400   17.5600 -111.4600      16.5        52       119        60
OIR    2025250     91400   17.5600 -111.4700      16.6        52       124        60
OIR    2025250     91400   17.5600 -111.4800      16.5        50       129        60
OIR    2025250     91400   17.5600 -111.4900      16.1        47       138        60
OIR    2025250     91400   17.5600 -111.7800      15.2        48       144        60
OIR    2025250     91400   17.5600 -111.7900      15.2        48       142        60
OIR    2025250     91400   17.5600 -111.8000      15.2        48       142        60
OIR    2025250     91400   17.5600 -111.8100      15.2        48       142        60
OIR    2025250     91400   17.5600 -112.2000      14.2        43       144        60
OIR    2025250     91400   17.5600 -112.2100      14.1        43       142        60
OIR    2025250     91400   17.5600 -112.2200      13.9        42       139        60
OIR    2025250     91400   17.5600 -112.2300      13.8        40       137        60
OIR    2025250     91400   17.5600 -112.2400      13.7        39       133        60
OIR    2025250     91400   17.5600 -112.2500      13.7        37       129        60
OIR    2025250     91400   17.5600 -112.2600      13.7        36       127        60
OIR    2025250     91400   17.5600 -112.2700      13.8        36       126        60
OIR    2025250     91400   17.5600 -112.2800      14.0        34       126        60
OIR    2025250     91400   17.5600 -112.2900      14.4        31       127        60
OIR    2025250     91400   17.5600 -112.3000      15.1        26       127        60
OIR    2025250     91400   17.5600 -112.3100      15.4        24       128        60
OIR    2025250     91400   17.5600 -112.3200      15.6        22       129        60
OIR    2025250     91400   17.5600 -112.3300      15.7        21       132        60
OIR    2025250     91400   17.5600 -112.3400      15.9        21       134        60
OIR    2025250     91400   17.5600 -112.3500      16.0        21       139        60
OIR    2025250     91400   17.5600 -112.3600      16.2        21       144        60
OIR    2025250     91400   17.5600 -112.3700      16.4        22       145        60
OIR    2025250     91400   17.5600 -112.3800      16.6        23       141        60
OIR    2025250     91400   17.5600 -112.3900      16.7        24       139        60
OIR    2025250     91400   17.5600 -112.4000      16.8        24       139        60
OIR    2025250     91400   17.5600 -112.4100      16.8        24       138        60
OIR    2025250     91400   17.5600 -112.4200      16.8        24       137        60
OIR    2025250     91400   17.5600 -112.4300      16.8        24       136        60
OIR    2025250     91400   17.5600 -112.4400      16.8        24       136        60
OIR    2025250     91400   17.5600 -112.4500      16.8        24       137        60
OIR    2025250     91400   17.5600 -112.4600      16.8        24       136        60
OIR    2025250     91400   17.5600 -112.4700      16.8        24       134        60
OIR    2025250     91400   17.5600 -112.4800      16.8        24       131        60
OIR    2025250     91400   17.5600 -112.4900      16.7        24       132        60
OIR    2025250     91400   17.5600 -112.5000      16.7        24       132        60
OIR    2025250     91400   17.5600 -112.5100      16.5        24       133        60
OIR    2025250     91400   17.5600 -112.5200      16.4        24       133        60
OIR    2025250     91400   17.5600 -112.5300      16.3        25       134        60
OIR    2025250     91400   17.5600 -112.5400      16.2        25       133        60
OIR    2025250     91400   17.5600 -112.5500      16.1        25       132        60
OIR    2025250     91400   17.5600 -112.5600      15.9        24       133        60
OIR    2025250     91400   17.5600 -112.5700      15.8        24       133        60
OIR    2025250     91400   17.5600 -112.5800      15.7        24       134        60
OIR    2025250     91400   17.5600 -112.5900      15.7        24       134        60
OIR    2025250     91400   17.5600 -112.6000      15.6        24       134        60
OIR    2025250     91400   17.5600 -112.6100      15.5        24       133        60
OIR    2025250     91400   17.5600 -112.6200      15.5        24       131        60
OIR    2025250     91400   17.5600 -112.6300      15.4        24       131        60
OIR    2025250     91400   17.5600 -112.6400      15.3        24       130        60
OIR    2025250     91400   17.5600 -112.6500      15.2        24       129        60
OIR    2025250     91400   17.5600 -112.6600      15.1        24       129        60
OIR    2025250     91400   17.5600 -112.6700      15.0        24       129        60
OIR    2025250     91400   17.5600 -112.6800      14.9        24       130        60
OIR    2025250     91400   17.5600 -112.6900      14.8        24       131        60
OIR    2025250     91400   17.5600 -112.7000      14.8        24       131        60
OIR    2025250     91400   17.5600 -112.7100      14.7        24       132        60
OIR    2025250     91400   17.5600 -112.7200      14.7        24       135        60
OIR    2025250     91400   17.5600 -112.7300      14.7        24       137        60
OIR    2025250     91400   17.5600 -112.7400      14.6        24       138        60
OIR    2025250     91400   17.5600 -112.7500      14.6        24       138        60
OIR    2025250     91400   17.5600 -112.7600      14.5        24       138        60
OIR    2025250     91400   17.5600 -112.7700      14.5        24       143        60
OIR    2025250     91400   17.5600 -112.9900      11.9        24       143        60
OIR    2025250     91400   17.5600 -113.0000      11.8        24       142        60
OIR    2025250     91400   17.5600 -113.0100      11.6        23       141        60
OIR    2025250     91400   17.5600 -113.0200      11.5        23       144        60
OIR    2025250     91400   17.5600 -113.0600      11.2        23       143        60
OIR    2025250     91400   17.5600 -113.0700      11.2        23       142        60
OIR    2025250     91400   17.5600 -113.0800      11.1        22       141        60
OIR    2025250     91400   17.5600 -113.0900      11.1        22       143        60
OIR    2025250     91400   17.5600 -113.1100      10.9        22       143        60
OIR    2025250     91400   17.5600 -113.1200      10.7        21       143        60
OIR    2025250     91400   17.5600 -113.1300      10.5        20       140        60
OIR    2025250     91400   17.5600 -113.1400      10.4        19       135        60
OIR    2025250     91400   17.5600 -113.1500      10.3        18       133        60
OIR    2025250     91400   17.5600 -113.1600      10.2        17       133        60
OIR    2025250     91400   17.5600 -113.1700      10.0        16       132        60
OIR    2025250     91400   17.5600 -113.1800       9.8        15       132        60
OIR    2025250     91400   17.5600 -113.1900       9.8        15       132        60
OIR    2025250     91400   17.5600 -113.2000       9.8        15       132        60
OIR    2025250     91400   17.5600 -113.2100       9.8        15       131        60
OIR    2025250     91400   17.5600 -113.2200       9.8        15       132        60
OIR    2025250     91400   17.5600 -113.2300       9.8        15       135        60
OIR    2025250     91400   17.5600 -113.2400      10.1        15       138        60
OIR    2025250     91400   17.5600 -113.2500      10.4        15       141        60
OIR    2025250     91400   17.5600 -113.2600      10.6        14       143        60
OIR    2025250     91400   17.5600 -113.3200      10.6        15       144        60
OIR    2025250     91400   17.5600 -113.3300      10.8        16       140        60
OIR    2025250     91400   17.5600 -113.3400      11.2        17       141        60
OIR    2025250     91400   17.5600 -113.3500      11.6        18       142        60
OIR    2025250     91400   17.5600 -113.3600      12.0        20       141        60
OIR    2025250     91400   17.5600 -113.3700      12.4        21       138        60
OIR    2025250     91400   17.5600 -113.3800      12.5        22       139        60
OIR    2025250     91400   17.5600 -113.3900      12.6        22       141        60
OIR    2025250     91400   17.5600 -113.4000      12.7        22       142        60
OIR    2025250     91400   17.5600 -113.4100      12.7        23       138        60
OIR    2025250     91400   17.5600 -113.4200      12.7        22       135        60
OIR    2025250     91400   17.5600 -113.4300      12.6        22       136        60
OIR    2025250     91400   17.5600 -113.4400      12.5        22       138        60
OIR    2025250     91400   17.5600 -113.4500      12.5        22       141        60
OIR    2025250     91400   17.5600 -113.4800      12.5        21       140        60
OIR    2025250     91400   17.5600 -113.4900      12.6        21       136        60
OIR    2025250     91400   17.5600 -113.5000      12.6        21       138        60
OIR    2025250     91400   17.5600 -113.5100      12.6        21       141        60
OIR    2025250     91400   17.5600 -113.5200      12.5        20       143        60
OIR    2025250     91400   17.5600 -113.6300      11.7        14       143        60
OIR    2025250     91400   17.5600 -113.6400      11.6        13       139        60
OIR    2025250     91400   17.5600 -113.6500      11.5        12       138        60
OIR    2025250     91400   17.5600 -113.6600      11.5        11       142        60
OIR    2025250     91400   17.5600 -113.6900      11.7         9       144        60
OIR    2025250     91400   17.5600 -113.7000      11.7         9       140        60
OIR    2025250     91400   17.5600 -113.7100      11.7         8       135        60
OIR    2025250     91400   17.5600 -113.7200      11.7         8       134        60
OIR    2025250     91400   17.5600 -113.7300      11.7         7       139        60
OIR    2025250     91400   17.5600 -113.7400      11.6         7       143        60
OIR    2025250     91400   17.5600 -113.9900       9.7       360       143        60
OIR    2025250     91400   17.5500 -110.5200      15.2        55       144        60
OIR    2025250     91400   17.5500 -110.5300      15.1        56       143        60
OIR    2025250     91400   17.5500 -110.5400      15.0        56       142        60
OIR    2025250     91400   17.5500 -110.5500      14.9        57       141        60
OIR    2025250     91400   17.5500 -110.5600      14.9        57       140        60
OIR    2025250     91400   17.5500 -110.5700      14.8        58       140        60
OIR    2025250     91400   17.5500 -110.5800      14.8        58       141        60
OIR    2025250     91400   17.5500 -110.5900      14.7        58       142        60
OIR    2025250     91400   17.5500 -110.6000      14.7        59       142        60
OIR    2025250     91400   17.5500 -110.6100      14.5        59       143        60
OIR    2025250     91400   17.5500 -110.6200      14.4        60       144        60
OIR    2025250     91400   17.5500 -110.6700      13.7        63       143        60
OIR    2025250     91400   17.5500 -110.6800      13.7        63       142        60
OIR    2025250     91400   17.5500 -110.6900      13.6        63       143        60
OIR    2025250     91400   17.5500 -110.7000      13.6        63       143        60
OIR    2025250     91400   17.5500 -110.7100      13.6        62       143        60
OIR    2025250     91400   17.5500 -110.7200      13.5        62       141        60
OIR    2025250     91400   17.5500 -110.7300      13.5        62       140        60
OIR    2025250     91400   17.5500 -110.7400      13.5        62       140        60
OIR    2025250     91400   17.5500 -110.7500      13.5        62       141        60
OIR    2025250     91400   17.5500 -110.7600      13.5        62       142        60
OIR    2025250     91400   17.5500 -110.7700      13.5        62       143        60
OIR    2025250     91400   17.5500 -110.7800      13.5        62       143        60
OIR    2025250     91400   17.5500 -110.7900      13.5        62       141        60
OIR    2025250     91400   17.5500 -110.8000      13.5        62       140        60
OIR    2025250     91400   17.5500 -110.8100      13.4        62       140        60
OIR    2025250     91400   17.5500 -110.8200      13.4        62       140        60
OIR    2025250     91400   17.5500 -110.8300      13.4        62       139        60
OIR    2025250     91400   17.5500 -110.8400      13.4        62       139        60
OIR    2025250     91400   17.5500 -110.8500      13.4        61       139        60
OIR    2025250     91400   17.5500 -110.8600      13.4        61       143        60
OIR    2025250     91400   17.5500 -111.4200      17.5        49       140        60
OIR    2025250     91400   17.5500 -111.4300      16.7        52       133        60
OIR    2025250     91400   17.5500 -111.4400      16.5        52       129        60
OIR    2025250     91400   17.5500 -111.4500      16.5        52       129        60
OIR    2025250     91400   17.5500 -111.4600      16.5        52       130        60
OIR    2025250     91400   17.5500 -111.4700      16.6        51       134        60
OIR    2025250     91400   17.5500 -111.4800      16.5        50       138        60
OIR    2025250     91400   17.5500 -111.4900      16.0        46       141        60
OIR    2025250     91400   17.5500 -111.7900      15.2        48       143        60
OIR    2025250     91400   17.5500 -111.8000      15.2        48       142        60
OIR    2025250     91400   17.5500 -111.8100      15.2        48       141        60
OIR    2025250     91400   17.5500 -111.8200      15.2        48       142        60
OIR    2025250     91400   17.5500 -111.8300      15.2        48       144        60
OIR    2025250     91400   17.5500 -112.2200      14.1        42       142        60
OIR    2025250     91400   17.5500 -112.2300      13.9        40       139        60
OIR    2025250     91400   17.5500 -112.2400      13.8        39       135        60
OIR    2025250     91400   17.5500 -112.2500      13.8        38       130        60
OIR    2025250     91400   17.5500 -112.2600      13.8        37       129        60
OIR    2025250     91400   17.5500 -112.2700      14.0        36       129        60
OIR    2025250     91400   17.5500 -112.2800      14.2        35       128        60
OIR    2025250     91400   17.5500 -112.2900      14.7        32       129        60
OIR    2025250     91400   17.5500 -112.3000      15.2        28       129        60
OIR    2025250     91400   17.5500 -112.3100      15.5        25       130        60
OIR    2025250     91400   17.5500 -112.3200      15.6        23       131        60
OIR    2025250     91400   17.5500 -112.3300      15.8        22       133        60
OIR    2025250     91400   17.5500 -112.3400      16.0        22       135        60
OIR    2025250     91400   17.5500 -112.3500      16.2        22       138        60
OIR    2025250     91400   17.5500 -112.3600      16.4        23       142        60
OIR    2025250     91400   17.5500 -112.3700      16.6        23       144        60
OIR    2025250     91400   17.5500 -112.3800      16.7        24       141        60
OIR    2025250     91400   17.5500 -112.3900      16.7        24       139        60
OIR    2025250     91400   17.5500 -112.4000      16.8        24       137        60
OIR    2025250     91400   17.5500 -112.4100      16.8        24       136        60
OIR    2025250     91400   17.5500 -112.4200      16.8        24       135        60
OIR    2025250     91400   17.5500 -112.4300      16.8        24       134        60
OIR    2025250     91400   17.5500 -112.4400      16.8        24       134        60
OIR    2025250     91400   17.5500 -112.4500      16.8        24       135        60
OIR    2025250     91400   17.5500 -112.4600      16.8        24       136        60
OIR    2025250     91400   17.5500 -112.4700      16.8        24       134        60
OIR    2025250     91400   17.5500 -112.4800      16.8        24       131        60
OIR    2025250     91400   17.5500 -112.4900      16.8        24       131        60
OIR    2025250     91400   17.5500 -112.5000      16.7        24       132        60
OIR    2025250     91400   17.5500 -112.5100      16.6        24       132        60
OIR    2025250     91400   17.5500 -112.5200      16.5        25       133        60
OIR    2025250     91400   17.5500 -112.5300      16.4        25       134        60
OIR    2025250     91400   17.5500 -112.5400      16.3        25       133        60
OIR    2025250     91400   17.5500 -112.5500      16.2        25       133        60
OIR    2025250     91400   17.5500 -112.5600      16.1        25       133        60
OIR    2025250     91400   17.5500 -112.5700      16.0        25       133        60
OIR    2025250     91400   17.5500 -112.5800      15.8        24       134        60
OIR    2025250     91400   17.5500 -112.5900      15.8        24       135        60
OIR    2025250     91400   17.5500 -112.6000      15.7        24       136        60
OIR    2025250     91400   17.5500 -112.6100      15.6        24       135        60
OIR    2025250     91400   17.5500 -112.6200      15.5        24       134        60
OIR    2025250     91400   17.5500 -112.6300      15.4        24       132        60
OIR    2025250     91400   17.5500 -112.6400      15.3        24       131        60
OIR    2025250     91400   17.5500 -112.6500      15.2        24       129        60
OIR    2025250     91400   17.5500 -112.6600      15.1        24       129        60
OIR    2025250     91400   17.5500 -112.6700      15.0        24       128        60
OIR    2025250     91400   17.5500 -112.6800      14.9        24       130        60
OIR    2025250     91400   17.5500 -112.6900      14.8        24       131        60
OIR    2025250     91400   17.5500 -112.7000      14.8        24       132        60
OIR    2025250     91400   17.5500 -112.7100      14.8        24       134        60
OIR    2025250     91400   17.5500 -112.7200      14.7        24       136        60
OIR    2025250     91400   17.5500 -112.7300      14.7        24       139        60
OIR    2025250     91400   17.5500 -112.7400      14.7        24       141        60
OIR    2025250     91400   17.5500 -112.7500      14.6        24       140        60
OIR    2025250     91400   17.5500 -112.7600      14.6        24       139        60
OIR    2025250     91400   17.5500 -112.7700      14.5        24       143        60
OIR    2025250     91400   17.5500 -112.8500      14.3        25       144        60
OIR    2025250     91400   17.5500 -112.9700      12.6        25       144        60
OIR    2025250     91400   17.5500 -113.0100      11.9        24       142        60
OIR    2025250     91400   17.5500 -113.0200      11.7        24       143        60
OIR    2025250     91400   17.5500 -113.0600      11.2        23       144        60
OIR    2025250     91400   17.5500 -113.0700      11.2        23       142        60
OIR    2025250     91400   17.5500 -113.0800      11.2        23       141        60
OIR    2025250     91400   17.5500 -113.0900      11.1        23       142        60
OIR    2025250     91400   17.5500 -113.1300      10.8        22       141        60
OIR    2025250     91400   17.5500 -113.1400      10.6        21       137        60
OIR    2025250     91400   17.5500 -113.1500      10.5        20       134        60
OIR    2025250     91400   17.5500 -113.1600      10.4        19       134        60
OIR    2025250     91400   17.5500 -113.1700      10.3        18       134        60
OIR    2025250     91400   17.5500 -113.1800      10.0        16       134        60
OIR    2025250     91400   17.5500 -113.1900       9.8        15       134        60
OIR    2025250     91400   17.5500 -113.2000       9.8        15       134        60
OIR    2025250     91400   17.5500 -113.2100       9.8        15       133        60
OIR    2025250     91400   17.5500 -113.2200       9.8        15       132        60
OIR    2025250     91400   17.5500 -113.2300       9.8        15       135        60
OIR    2025250     91400   17.5500 -113.2400      10.3        15       138        60
OIR    2025250     91400   17.5500 -113.2500      10.6        15       139        60
OIR    2025250     91400   17.5500 -113.2600      10.7        14       140        60
OIR    2025250     91400   17.5500 -113.3300      11.0        17       143        60
OIR    2025250     91400   17.5500 -113.3400      11.5        18       143        60
OIR    2025250     91400   17.5500 -113.3500      12.1        20       143        60
OIR    2025250     91400   17.5500 -113.3600      12.5        21       141        60
OIR    2025250     91400   17.5500 -113.3700      12.8        22       137        60
OIR    2025250     91400   17.5500 -113.3800      12.9        22       136        60
OIR    2025250     91400   17.5500 -113.3900      12.9        23       138        60
OIR    2025250     91400   17.5500 -113.4000      12.8        23       140        60
OIR    2025250     91400   17.5500 -113.4100      12.8        23       138        60
OIR    2025250     91400   17.5500 -113.4200      12.8        23       136        60
OIR    2025250     91400   17.5500 -113.4300      12.8        22       136        60
OIR    2025250     91400   17.5500 -113.4400      12.7        22       139        60
OIR    2025250     91400   17.5500 -113.4500      12.6        22       142        60
OIR    2025250     91400   17.5500 -113.4800      12.6        21       143        60
OIR    2025250     91400   17.5500 -113.4900      12.7        21       140        60
OIR    2025250     91400   17.5500 -113.5000      12.7        21       138        60
OIR    2025250     91400   17.5500 -113.5100      12.7        21       136        60
OIR    2025250     91400   17.5500 -113.5200      12.7        20       140        60
OIR    2025250     91400   17.5500 -113.6200      11.9        15       143        60
OIR    2025250     91400   17.5500 -113.6300      11.8        14       139        60
OIR    2025250     91400   17.5500 -113.6400      11.7        13       137        60
OIR    2025250     91400   17.5500 -113.6500      11.7        12       136        60
OIR    2025250     91400   17.5500 -113.6600      11.6        11       140        60
OIR    2025250     91400   17.5500 -113.6700      11.7        10       144        60
OIR    2025250     91400   17.5500 -113.6900      11.9         9       144        60
OIR    2025250     91400   17.5500 -113.7000      11.9         9       142        60
OIR    2025250     91400   17.5500 -113.7100      11.9         8       139        60
OIR    2025250     91400   17.5500 -113.7200      11.9         7       137        60
OIR    2025250     91400   17.5500 -113.7300      11.9         7       138        60
OIR    2025250     91400   17.5500 -113.7400      11.8         7       139        60
OIR    2025250     91400   17.5500 -113.7500      11.7         6       143        60
OIR    2025250     91400   17.5400 -110.5200      15.0        55       144        60
OIR    2025250     91400   17.5400 -110.5300      15.0        56       143        60
OIR    2025250     91400   17.5400 -110.5400      14.9        56       142        60
OIR    2025250     91400   17.5400 -110.5500      14.8        57       141        60
OIR    2025250     91400   17.5400 -110.5600      14.8        57       141        60
OIR    2025250     91400   17.5400 -110.5700      14.7        58       141        60
OIR    2025250     91400   17.5400 -110.5800      14.7        58       142        60
OIR    2025250     91400   17.5400 -110.5900      14.6        59       143        60
OIR    2025250     91400   17.5400 -110.6000      14.5        59       143        60
OIR    2025250     91400   17.5400 -110.6100      14.4        60       143        60
OIR    2025250     91400   17.5400 -110.6200      14.3        60       144        60
OIR    2025250     91400   17.5400 -110.6800      13.6        63       143        60
OIR    2025250     91400   17.5400 -110.6900      13.6        63       144        60
OIR    2025250     91400   17.5400 -110.7200      13.5        62       144        60
OIR    2025250     91400   17.5400 -110.7300      13.5        62       142        60
OIR    2025250     91400   17.5400 -110.7400      13.5        62       144        60
OIR    2025250     91400   17.5400 -110.8100      13.4        62       143        60
OIR    2025250     91400   17.5400 -110.8200      13.4        62       141        60
OIR    2025250     91400   17.5400 -110.8300      13.4        62       141        60
OIR    2025250     91400   17.5400 -110.8400      13.3        61       141        60
OIR    2025250     91400   17.5400 -110.8500      13.3        61       141        60
OIR    2025250     91400   17.5400 -111.4400      16.4        52       141        60
OIR    2025250     91400   17.5400 -111.4500      16.4        52       141        60
OIR    2025250     91400   17.5400 -111.4600      16.4        51       140        60
OIR    2025250     91400   17.5400 -111.4700      16.4        50       143        60
OIR    2025250     91400   17.5400 -112.2300      14.1        41       141        60
OIR    2025250     91400   17.5400 -112.2400      14.0        40       136        60
OIR    2025250     91400   17.5400 -112.2500      14.0        39       131        60
OIR    2025250     91400   17.5400 -112.2600      14.1        38       131        60
OIR    2025250     91400   17.5400 -112.2700      14.3        37       130        60
OIR    2025250     91400   17.5400 -112.2800      14.7        35       130        60
OIR    2025250     91400   17.5400 -112.2900      15.1        33       130        60
OIR    2025250     91400   17.5400 -112.3000      15.4        31       130        60
OIR    2025250     91400   17.5400 -112.3100      15.6        29       131        60
OIR    2025250     91400   17.5400 -112.3200      15.8        27       133        60
OIR    2025250     91400   17.5400 -112.3300      16.0        25       134        60
OIR    2025250     91400   17.5400 -112.3400      16.2        24       137        60
OIR    2025250     91400   17.5400 -112.3500      16.5        24       138        60
OIR    2025250     91400   17.5400 -112.3600      16.7        24       138        60
OIR    2025250     91400   17.5400 -112.3700      16.7        24       138        60
OIR    2025250     91400   17.5400 -112.3800      16.8        24       138        60
OIR    2025250     91400   17.5400 -112.3900      16.8        24       138        60
OIR    2025250     91400   17.5400 -112.4000      16.8        24       137        60
OIR    2025250     91400   17.5400 -112.4100      16.8        24       136        60
OIR    2025250     91400   17.5400 -112.4200      16.8        24       135        60
OIR    2025250     91400   17.5400 -112.4300      16.8        24       134        60
OIR    2025250     91400   17.5400 -112.4400      16.8        24       134        60
OIR    2025250     91400   17.5400 -112.4500      16.9        24       134        60
OIR    2025250     91400   17.5400 -112.4600      16.9        24       134        60
OIR    2025250     91400   17.5400 -112.4700      16.9        24       133        60
OIR    2025250     91400   17.5400 -112.4800      16.8        24       131        60
OIR    2025250     91400   17.5400 -112.4900      16.8        24       131        60
OIR    2025250     91400   17.5400 -112.5000      16.8        25       132        60
OIR    2025250     91400   17.5400 -112.5100      16.7        25       132        60
OIR    2025250     91400   17.5400 -112.5200      16.6        25       133        60
OIR    2025250     91400   17.5400 -112.5300      16.6        25       133        60
OIR    2025250     91400   17.5400 -112.5400      16.5        25       134        60
OIR    2025250     91400   17.5400 -112.5500      16.4        25       135        60
OIR    2025250     91400   17.5400 -112.5600      16.3        25       135        60
OIR    2025250     91400   17.5400 -112.5700      16.2        25       135        60
OIR    2025250     91400   17.5400 -112.5800      16.0        24       135        60
OIR    2025250     91400   17.5400 -112.5900      15.9        24       135        60
OIR    2025250     91400   17.5400 -112.6000      15.8        24       134        60
OIR    2025250     91400   17.5400 -112.6100      15.7        24       134        60
OIR    2025250     91400   17.5400 -112.6200      15.6        24       133        60
OIR    2025250     91400   17.5400 -112.6300      15.5        24       132        60
OIR    2025250     91400   17.5400 -112.6400      15.3        24       131        60
OIR    2025250     91400   17.5400 -112.6500      15.2        24       130        60
OIR    2025250     91400   17.5400 -112.6600      15.1        24       129        60
OIR    2025250     91400   17.5400 -112.6700      15.0        24       128        60
OIR    2025250     91400   17.5400 -112.6800      14.9        24       130        60
OIR    2025250     91400   17.5400 -112.6900      14.9        24       132        60
OIR    2025250     91400   17.5400 -112.7000      14.8        24       133        60
OIR    2025250     91400   17.5400 -112.7100      14.8        24       135        60
OIR    2025250     91400   17.5400 -112.7200      14.8        24       137        60
OIR    2025250     91400   17.5400 -112.7300      14.7        24       139        60
OIR    2025250     91400   17.5400 -112.7400      14.7        24       141        60
OIR    2025250     91400   17.5400 -112.7500      14.7        24       141        60
OIR    2025250     91400   17.5400 -112.7600      14.6        24       141        60
OIR    2025250     91400   17.5400 -112.7700      14.5        24       143        60
OIR    2025250     91400   17.5400 -112.8500      14.3        25       142        60
OIR    2025250     91400   17.5400 -112.8600      14.3        25       142        60
OIR    2025250     91400   17.5400 -112.8700      14.3        25       144        60
OIR    2025250     91400   17.5400 -112.8900      14.3        25       142        60
OIR    2025250     91400   17.5400 -112.9000      14.2        25       140        60
OIR    2025250     91400   17.5400 -112.9100      14.2        26       143        60
OIR    2025250     91400   17.5400 -112.9600      13.6        26       143        60
OIR    2025250     91400   17.5400 -112.9700      13.2        26       141        60
OIR    2025250     91400   17.5400 -113.0300      11.9        24       143        60
OIR    2025250     91400   17.5400 -113.0400      11.6        23       142        60
OIR    2025250     91400   17.5400 -113.0500      11.5        23       143        60
OIR    2025250     91400   17.5400 -113.0700      11.3        23       144        60
OIR    2025250     91400   17.5400 -113.0800      11.2        23       143        60
OIR    2025250     91400   17.5400 -113.0900      11.2        23       143        60
OIR    2025250     91400   17.5400 -113.1000      11.2        23       143        60
OIR    2025250     91400   17.5400 -113.1100      11.1        23       143        60
OIR    2025250     91400   17.5400 -113.1200      11.0        22       143        60
OIR    2025250     91400   17.5400 -113.1300      11.0        22       143        60
OIR    2025250     91400   17.5400 -113.1400      10.9        22       139        60
OIR    2025250     91400   17.5400 -113.1500      10.8        21       135        60
OIR    2025250     91400   17.5400 -113.1600      10.7        20       137        60
OIR    2025250     91400   17.5400 -113.1700      10.7        20       139        60
OIR    2025250     91400   17.5400 -113.1800      10.3        17       138        60
OIR    2025250     91400   17.5400 -113.1900       9.9        16       137        60
OIR    2025250     91400   17.5400 -113.2000       9.8        16       135        60
OIR    2025250     91400   17.5400 -113.2100       9.8        16       134        60
OIR    2025250     91400   17.5400 -113.2200       9.8        15       134        60
OIR    2025250     91400   17.5400 -113.2300      10.0        16       136        60
OIR    2025250     91400   17.5400 -113.2400      10.5        16       139        60
OIR    2025250     91400   17.5400 -113.2500      10.9        15       141        60
OIR    2025250     91400   17.5400 -113.2600      11.1        15       142        60
OIR    2025250     91400   17.5400 -113.2700      11.0        14       143        60
OIR    2025250     91400   17.5400 -113.3100      11.0        16       144        60
OIR    2025250     91400   17.5400 -113.3200      11.2        18       143        60
OIR    2025250     91400   17.5400 -113.3300      11.7        19       143        60
OIR    2025250     91400   17.5400 -113.3400      12.3        21       142        60
OIR    2025250     91400   17.5400 -113.3500      12.8        22       141        60
OIR    2025250     91400   17.5400 -113.3600      13.1        22       139        60
OIR    2025250     91400   17.5400 -113.3700      13.3        23       137        60
OIR    2025250     91400   17.5400 -113.3800      13.3        23       135        60
OIR    2025250     91400   17.5400 -113.3900      13.3        23       137        60
OIR    2025250     91400   17.5400 -113.4000      13.2        23       139        60
OIR    2025250     91400   17.5400 -113.4100      13.1        23       139        60
OIR    2025250     91400   17.5400 -113.4200      13.1        23       137        60
OIR    2025250     91400   17.5400 -113.4300      13.0        23       137        60
OIR    2025250     91400   17.5400 -113.4400      12.8        22       139        60
OIR    2025250     91400   17.5400 -113.4500      12.8        22       141        60
OIR    2025250     91400   17.5400 -113.4600      12.7        21       144        60
OIR    2025250     91400   17.5400 -113.4900      12.7        21       143        60
OIR    2025250     91400   17.5400 -113.5000      12.7        21       140        60
OIR    2025250     91400   17.5400 -113.5100      12.7        20       135        60
OIR    2025250     91400   17.5400 -113.5200      12.8        20       136        60
OIR    2025250     91400   17.5400 -113.5300      12.7        20       144        60
OIR    2025250     91400   17.5400 -113.6200      12.0        15       142        60
OIR    2025250     91400   17.5400 -113.6300      11.9        14       134        60
OIR    2025250     91400   17.5400 -113.6400      11.9        13       134        60
OIR    2025250     91400   17.5400 -113.6500      11.9        12       134        60
OIR    2025250     91400   17.5400 -113.6600      11.9        11       138        60
OIR    2025250     91400   17.5400 -113.6700      12.0        10       142        60
OIR    2025250     91400   17.5400 -113.6800      12.1         9       144        60
OIR    2025250     91400   17.5400 -113.6900      12.3         9       144        60
OIR    2025250     91400   17.5400 -113.7000      12.3         8       144        60
OIR    2025250     91400   17.5400 -113.7100      12.2         8       144        60
OIR    2025250     91400   17.5400 -113.7300      12.0         7       141        60
OIR    2025250     91400   17.5400 -113.7400      12.0         7       137        60
OIR    2025250     91400   17.5400 -113.7500      11.9         6       138        60
OIR    2025250     91400   17.5400 -113.7600      11.8         6       144        60
OIR    2025250     91400   17.5300 -110.5200      14.9        55       144        60
OIR    2025250     91400   17.5300 -110.5300      14.8        56       143        60
OIR    2025250     91400   17.5300 -110.5400      14.8        57       143        60
OIR    2025250     91400   17.5300 -110.5500      14.7        57       142        60
OIR    2025250     91400   17.5300 -110.5600      14.7        58       142        60
OIR    2025250     91400   17.5300 -110.5700      14.6        58       142        60
OIR    2025250     91400   17.5300 -110.5800      14.6        58       144        60
OIR    2025250     91400   17.5300 -110.6000      14.4        59       144        60
OIR    2025250     91400   17.5300 -110.6100      14.3        60       144        60
OIR    2025250     91400   17.5300 -110.6200      14.1        61       144        60
OIR    2025250     91400   17.5300 -112.2300      14.6        41       142        60
OIR    2025250     91400   17.5300 -112.2400      14.5        40       138        60
OIR    2025250     91400   17.5300 -112.2500      14.3        39       134        60
OIR    2025250     91400   17.5300 -112.2600      14.6        38       133        60
OIR    2025250     91400   17.5300 -112.2700      14.9        37       134        60
OIR    2025250     91400   17.5300 -112.2800      15.3        36       134        60
OIR    2025250     91400   17.5300 -112.2900      15.6        35       133        60
OIR    2025250     91400   17.5300 -112.3000      15.7        33       132        60
OIR    2025250     91400   17.5300 -112.3100      15.9        31       132        60
OIR    2025250     91400   17.5300 -112.3200      16.0        30       133        60
OIR    2025250     91400   17.5300 -112.3300      16.2        28       135        60
OIR    2025250     91400   17.5300 -112.3400      16.4        27       137        60
OIR    2025250     91400   17.5300 -112.3500      16.6        26       137        60
OIR    2025250     91400   17.5300 -112.3600      16.7        26       136        60
OIR    2025250     91400   17.5300 -112.3700      16.8        25       135        60
OIR    2025250     91400   17.5300 -112.3800      16.8        25       136        60
OIR    2025250     91400   17.5300 -112.3900      16.8        25       138        60
OIR    2025250     91400   17.5300 -112.4000      16.8        25       138        60
OIR    2025250     91400   17.5300 -112.4100      16.8        25       137        60
OIR    2025250     91400   17.5300 -112.4200      16.8        25       136        60
OIR    2025250     91400   17.5300 -112.4300      16.9        24       135        60
OIR    2025250     91400   17.5300 -112.4400      16.9        24       134        60
OIR    2025250     91400   17.5300 -112.4500      16.9        24       133        60
OIR    2025250     91400   17.5300 -112.4600      16.9        24       132        60
OIR    2025250     91400   17.5300 -112.4700      16.9        24       132        60
OIR    2025250     91400   17.5300 -112.4800      16.9        25       131        60
OIR    2025250     91400   17.5300 -112.4900      16.8        25       130        60
OIR    2025250     91400   17.5300 -112.5000      16.8        25       131        60
OIR    2025250     91400   17.5300 -112.5100      16.8        25       133        60
OIR    2025250     91400   17.5300 -112.5200      16.7        25       133        60
OIR    2025250     91400   17.5300 -112.5300      16.7        25       133        60
OIR    2025250     91400   17.5300 -112.5400      16.6        25       135        60
OIR    2025250     91400   17.5300 -112.5500      16.6        25       136        60
OIR    2025250     91400   17.5300 -112.5600      16.5        25       137        60
OIR    2025250     91400   17.5300 -112.5700      16.4        25       137        60
OIR    2025250     91400   17.5300 -112.5800      16.2        25       137        60
OIR    2025250     91400   17.5300 -112.5900      16.1        24       135        60
OIR    2025250     91400   17.5300 -112.6000      15.9        24       133        60
OIR    2025250     91400   17.5300 -112.6100      15.8        24       132        60
OIR    2025250     91400   17.5300 -112.6200      15.7        24       131        60
OIR    2025250     91400   17.5300 -112.6300      15.6        24       131        60
OIR    2025250     91400   17.5300 -112.6400      15.4        24       130        60
OIR    2025250     91400   17.5300 -112.6500      15.3        24       130        60
OIR    2025250     91400   17.5300 -112.6600      15.2        24       129        60
OIR    2025250     91400   17.5300 -112.6700      15.0        24       129        60
OIR    2025250     91400   17.5300 -112.6800      15.0        24       131        60
OIR    2025250     91400   17.5300 -112.6900      14.9        24       133        60
OIR    2025250     91400   17.5300 -112.7000      14.8        24       134        60
OIR    2025250     91400   17.5300 -112.7100      14.8        24       135        60
OIR    2025250     91400   17.5300 -112.7200      14.8        24       135        60
OIR    2025250     91400   17.5300 -112.7300      14.8        24       137        60
OIR    2025250     91400   17.5300 -112.7400      14.7        24       139        60
OIR    2025250     91400   17.5300 -112.7500      14.7        24       142        60
OIR    2025250     91400   17.5300 -112.8500      14.3        25       142        60
OIR    2025250     91400   17.5300 -112.8600      14.3        25       140        60
OIR    2025250     91400   17.5300 -112.8700      14.3        25       141        60
OIR    2025250     91400   17.5300 -112.8800      14.3        25       141        60
OIR    2025250     91400   17.5300 -112.8900      14.3        25       142        60
OIR    2025250     91400   17.5300 -112.9000      14.3        26       143        60
OIR    2025250     91400   17.5300 -112.9500      14.0        26       144        60
OIR    2025250     91400   17.5300 -112.9600      13.9        26       142        60
OIR    2025250     91400   17.5300 -112.9700      13.7        26       141        60
OIR    2025250     91400   17.5300 -112.9800      13.5        26       143        60
OIR    2025250     91400   17.5300 -113.0400      12.0        24       143        60
OIR    2025250     91400   17.5300 -113.1000      11.2        23       143        60
OIR    2025250     91400   17.5300 -113.1100      11.2        23       142        60
OIR    2025250     91400   17.5300 -113.1200      11.1        23       143        60
OIR    2025250     91400   17.5300 -113.1400      11.1        23       142        60
OIR    2025250     91400   17.5300 -113.1500      11.1        22       138        60
OIR    2025250     91400   17.5300 -113.1600      11.1        22       140        60
OIR    2025250     91400   17.5300 -113.1700      11.2        21       143        60
OIR    2025250     91400   17.5300 -113.1800      10.9        19       142        60
OIR    2025250     91400   17.5300 -113.1900      10.5        18       139        60
OIR    2025250     91400   17.5300 -113.2000      10.0        17       137        60
OIR    2025250     91400   17.5300 -113.2100       9.9        16       137        60
OIR    2025250     91400   17.5300 -113.2200      10.0        17       137        60
OIR    2025250     91400   17.5300 -113.2300      10.4        17       138        60
OIR    2025250     91400   17.5300 -113.2400      11.2        17       141        60
OIR    2025250     91400   17.5300 -113.2500      11.7        17       142        60
OIR    2025250     91400   17.5300 -113.2600      11.9        18       143        60
OIR    2025250     91400   17.5300 -113.2700      12.1        18       143        60
OIR    2025250     91400   17.5300 -113.2800      12.0        18       142        60
OIR    2025250     91400   17.5300 -113.2900      12.1        18       140        60
OIR    2025250     91400   17.5300 -113.3000      12.3        19       141        60
OIR    2025250     91400   17.5300 -113.3100      12.5        20       141        60
OIR    2025250     91400   17.5300 -113.3200      12.8        21       142        60
OIR    2025250     91400   17.5300 -113.3300      13.1        22       142        60
OIR    2025250     91400   17.5300 -113.3400      13.3        23       142        60
OIR    2025250     91400   17.5300 -113.3500      13.4        23       139        60
OIR    2025250     91400   17.5300 -113.3600      13.5        23       137        60
OIR    2025250     91400   17.5300 -113.3700      13.6        23       137        60
OIR    2025250     91400   17.5300 -113.3800      13.6        23       136        60
OIR    2025250     91400   17.5300 -113.3900      13.6        23       138        60
OIR    2025250     91400   17.5300 -113.4000      13.6        23       139        60
OIR    2025250     91400   17.5300 -113.4100      13.5        23       140        60
OIR    2025250     91400   17.5300 -113.4200      13.4        23       140        60
OIR    2025250     91400   17.5300 -113.4300      13.2        23       139        60
OIR    2025250     91400   17.5300 -113.4400      13.0        22       137        60
OIR    2025250     91400   17.5300 -113.4500      12.9        22       137        60
OIR    2025250     91400   17.5300 -113.4600      12.8        22       141        60
OIR    2025250     91400   17.5300 -113.4900      12.8        21       143        60
OIR    2025250     91400   17.5300 -113.5000      12.8        21       141        60
OIR    2025250     91400   17.5300 -113.5100      12.8        20       140        60
OIR    2025250     91400   17.5300 -113.5200      12.8        20       139        60
OIR    2025250     91400   17.5300 -113.5300      12.8        20       142        60
OIR    2025250     91400   17.5300 -113.6000      12.5        16       144        60
OIR    2025250     91400   17.5300 -113.6100      12.4        15       143        60
OIR    2025250     91400   17.5300 -113.6200      12.3        14       140        60
OIR    2025250     91400   17.5300 -113.6300      12.2        13       137        60
OIR    2025250     91400   17.5300 -113.6400      12.2        12       135        60
OIR    2025250     91400   17.5300 -113.6500      12.3        11       134        60
OIR    2025250     91400   17.5300 -113.6600      12.5        10       135        60
OIR    2025250     91400   17.5300 -113.6700      12.7         9       138        60
OIR    2025250     91400   17.5300 -113.6800      12.8         8       141        60
OIR    2025250     91400   17.5300 -113.6900      12.7         8       143        60
OIR    2025250     91400   17.5300 -113.7300      12.2         7       142        60
OIR    2025250     91400   17.5300 -113.7400      12.1         6       135        60
OIR    2025250     91400   17.5300 -113.7500      12.1         6       135        60
OIR    2025250     91400   17.5300 -113.7600      12.0         6       141        60
OIR    2025250     91400   17.5200 -110.5300      14.7        56       144        60
OIR    2025250     91400   17.5200 -110.5400      14.6        57       144        60
OIR    2025250     91400   17.5200 -110.5500      14.6        57       144        60
OIR    2025250     91400   17.5200 -110.5600      14.6        58       144        60
OIR    2025250     91400   17.5200 -110.5700      14.5        58       144        60
OIR    2025250     91400   17.5200 -111.5300      15.6        46       143        60
OIR    2025250     91400   17.5200 -111.5400      15.6        46       142        60
OIR    2025250     91400   17.5200 -111.5500      15.6        46       141        60
OIR    2025250     91400   17.5200 -111.5600      15.6        46       142        60
OIR    2025250     91400   17.5200 -112.1400      14.8        46       143        60
OIR    2025250     91400   17.5200 -112.2300      15.8        40       143        60
OIR    2025250     91400   17.5200 -112.2400      15.8        40       140        60
OIR    2025250     91400   17.5200 -112.2500      15.8        39       138        60
OIR    2025250     91400   17.5200 -112.2600      15.9        38       137        60
OIR    2025250     91400   17.5200 -112.2700      16.0        37       137        60
OIR    2025250     91400   17.5200 -112.2800      16.0        37       137        60
OIR    2025250     91400   17.5200 -112.2900      16.1        36       136        60
OIR    2025250     91400   17.5200 -112.3000      16.1        34       134        60
OIR    2025250     91400   17.5200 -112.3100      16.2        33       133        60
OIR    2025250     91400   17.5200 -112.3200      16.3        31       134        60
OIR    2025250     91400   17.5200 -112.3300      16.4        30       135        60
OIR    2025250     91400   17.5200 -112.3400      16.6        28       136        60
OIR    2025250     91400   17.5200 -112.3500      16.7        27       137        60
OIR    2025250     91400   17.5200 -112.3600      16.8        27       136        60
OIR    2025250     91400   17.5200 -112.3700      16.8        26       135        60
OIR    2025250     91400   17.5200 -112.3800      16.9        26       137        60
OIR    2025250     91400   17.5200 -112.3900      16.9        26       138        60
OIR    2025250     91400   17.5200 -112.4000      16.9        25       139        60
OIR    2025250     91400   17.5200 -112.4100      16.9        25       138        60
OIR    2025250     91400   17.5200 -112.4200      16.9        25       138        60
OIR    2025250     91400   17.5200 -112.4300      16.9        25       136        60
OIR    2025250     91400   17.5200 -112.4400      16.9        25       134        60
OIR    2025250     91400   17.5200 -112.4500      16.9        25       133        60
OIR    2025250     91400   17.5200 -112.4600      16.9        25       133        60
OIR    2025250     91400   17.5200 -112.4700      16.9        25       132        60
OIR    2025250     91400   17.5200 -112.4800      16.9        25       132        60
OIR    2025250     91400   17.5200 -112.4900      16.9        25       132        60
OIR    2025250     91400   17.5200 -112.5000      16.8        25       132        60
OIR    2025250     91400   17.5200 -112.5100      16.8        25       133        60
OIR    2025250     91400   17.5200 -112.5200      16.8        25       134        60
OIR    2025250     91400   17.5200 -112.5300      16.7        25       136        60
OIR    2025250     91400   17.5200 -112.5400      16.7        25       136        60
OIR    2025250     91400   17.5200 -112.5500      16.7        25       136        60
OIR    2025250     91400   17.5200 -112.5600      16.6        25       136        60
OIR    2025250     91400   17.5200 -112.5700      16.5        25       136        60
OIR    2025250     91400   17.5200 -112.5800      16.5        25       137        60
OIR    2025250     91400   17.5200 -112.5900      16.3        25       136        60
OIR    2025250     91400   17.5200 -112.6000      16.1        24       135        60
OIR    2025250     91400   17.5200 -112.6100      15.9        24       134        60
OIR    2025250     91400   17.5200 -112.6200      15.8        24       133        60
OIR    2025250     91400   17.5200 -112.6300      15.6        24       133        60
OIR    2025250     91400   17.5200 -112.6400      15.5        24       132        60
OIR    2025250     91400   17.5200 -112.6500      15.4        24       132        60
OIR    2025250     91400   17.5200 -112.6600      15.3        24       131        60
OIR    2025250     91400   17.5200 -112.6700      15.1        24       131        60
OIR    2025250     91400   17.5200 -112.6800      15.0        24       132        60
OIR    2025250     91400   17.5200 -112.6900      14.9        24       134        60
OIR    2025250     91400   17.5200 -112.7000      14.9        24       136        60
OIR    2025250     91400   17.5200 -112.7100      14.8        24       135        60
OIR    2025250     91400   17.5200 -112.7200      14.8        24       135        60
OIR    2025250     91400   17.5200 -112.7300      14.8        24       136        60
OIR    2025250     91400   17.5200 -112.7400      14.8        24       138        60
OIR    2025250     91400   17.5200 -112.7500      14.7        24       141        60
OIR    2025250     91400   17.5200 -112.8500      14.4        25       141        60
OIR    2025250     91400   17.5200 -112.8600      14.3        25       139        60
OIR    2025250     91400   17.5200 -112.8700      14.3        25       139        60
OIR    2025250     91400   17.5200 -112.8800      14.3        25       139        60
OIR    2025250     91400   17.5200 -112.8900      14.3        26       142        60
OIR    2025250     91400   17.5200 -112.9400      14.2        26       144        60
OIR    2025250     91400   17.5200 -112.9500      14.2        27       141        60
OIR    2025250     91400   17.5200 -112.9600      14.1        27       141        60
OIR    2025250     91400   17.5200 -112.9700      14.0        27       140        60
OIR    2025250     91400   17.5200 -112.9800      13.8        27       143        60
OIR    2025250     91400   17.5200 -113.1000      11.3        23       143        60
OIR    2025250     91400   17.5200 -113.1100      11.3        23       141        60
OIR    2025250     91400   17.5200 -113.1200      11.2        23       142        60
OIR    2025250     91400   17.5200 -113.1500      11.3        23       143        60
OIR    2025250     91400   17.5200 -113.1600      11.5        23       143        60
OIR    2025250     91400   17.5200 -113.2000      10.9        20       143        60
OIR    2025250     91400   17.5200 -113.2100      10.6        19       143        60
OIR    2025250     91400   17.5200 -113.2200      10.8        19       142        60
OIR    2025250     91400   17.5200 -113.2300      11.4        19       142        60
OIR    2025250     91400   17.5200 -113.2400      12.0        19       142        60
OIR    2025250     91400   17.5200 -113.2500      12.5        20       142        60
OIR    2025250     91400   17.5200 -113.2600      12.7        21       143        60
OIR    2025250     91400   17.5200 -113.2700      12.8        21       143        60
OIR    2025250     91400   17.5200 -113.2800      12.7        20       143        60
OIR    2025250     91400   17.5200 -113.2900      12.7        20       143        60
OIR    2025250     91400   17.5200 -113.3000      12.8        20       142        60
OIR    2025250     91400   17.5200 -113.3100      12.9        21       141        60
OIR    2025250     91400   17.5200 -113.3200      13.2        22       141        60
OIR    2025250     91400   17.5200 -113.3300      13.4        23       141        60
OIR    2025250     91400   17.5200 -113.3400      13.5        24       141        60
OIR    2025250     91400   17.5200 -113.3500      13.6        24       140        60
OIR    2025250     91400   17.5200 -113.3600      13.6        24       138        60
OIR    2025250     91400   17.5200 -113.3700      13.6        24       138        60
OIR    2025250     91400   17.5200 -113.3800      13.6        24       137        60
OIR    2025250     91400   17.5200 -113.3900      13.6        23       138        60
OIR    2025250     91400   17.5200 -113.4000      13.6        23       139        60
OIR    2025250     91400   17.5200 -113.4100      13.6        23       140        60
OIR    2025250     91400   17.5200 -113.4200      13.6        23       141        60
OIR    2025250     91400   17.5200 -113.4300      13.5        23       141        60
OIR    2025250     91400   17.5200 -113.4400      13.4        23       139        60
OIR    2025250     91400   17.5200 -113.4500      13.2        22       137        60
OIR    2025250     91400   17.5200 -113.4600      13.0        22       141        60
OIR    2025250     91400   17.5200 -113.4900      13.0        21       144        60
OIR    2025250     91400   17.5200 -113.5000      12.9        20       143        60
OIR    2025250     91400   17.5200 -113.5100      12.9        20       143        60
OIR    2025250     91400   17.5200 -113.5200      12.9        20       143        60
OIR    2025250     91400   17.5200 -113.5300      12.9        19       143        60
OIR    2025250     91400   17.5200 -113.5400      12.8        19       143        60
OIR    2025250     91400   17.5200 -113.5500      12.8        18       143        60
OIR    2025250     91400   17.5200 -113.5600      12.7        18       142        60
OIR    2025250     91400   17.5200 -113.5700      12.7        17       142        60
OIR    2025250     91400   17.5200 -113.5800      12.7        17       142        60
OIR    2025250     91400   17.5200 -113.5900      12.7        17       140        60
OIR    2025250     91400   17.5200 -113.6000      12.6        16       138        60
OIR    2025250     91400   17.5200 -113.6100      12.6        15       135        60
OIR    2025250     91400   17.5200 -113.6200      12.6        14       136        60
OIR    2025250     91400   17.5200 -113.6300      12.6        12       138        60
OIR    2025250     91400   17.5200 -113.6400      12.7        11       137        60
OIR    2025250     91400   17.5200 -113.6500      12.9         9       134        60
OIR    2025250     91400   17.5200 -113.6600      13.1         8       133        60
OIR    2025250     91400   17.5200 -113.6700      13.2         8       134        60
OIR    2025250     91400   17.5200 -113.6800      13.2         8       136        60
OIR    2025250     91400   17.5200 -113.6900      13.2         8       141        60
OIR    2025250     91400   17.5200 -113.7300      12.7         7       141        60
OIR    2025250     91400   17.5200 -113.7400      12.5         7       134        60
OIR    2025250     91400   17.5200 -113.7500      12.5         7       133        60
OIR    2025250     91400   17.5200 -113.7600      12.4         7       139        60
OIR    2025250     91400   17.5100 -110.5300      14.5        57       144        60
OIR    2025250     91400   17.5100 -111.4700      15.7        48       141        60
OIR    2025250     91400   17.5100 -111.4800      15.7        47       142        60
OIR    2025250     91400   17.5100 -111.4900      15.7        46       142        60
OIR    2025250     91400   17.5100 -111.5000      15.6        46       141        60
OIR    2025250     91400   17.5100 -111.5100      15.6        46       140        60
OIR    2025250     91400   17.5100 -111.5200      15.6        46       140        60
OIR    2025250     91400   17.5100 -111.5300      15.6        46       140        60
OIR    2025250     91400   17.5100 -111.5400      15.6        46       141        60
OIR    2025250     91400   17.5100 -111.5500      15.6        46       143        60
OIR    2025250     91400   17.5100 -112.2400      16.0        40       142        60
OIR    2025250     91400   17.5100 -112.2500      16.1        39       139        60
OIR    2025250     91400   17.5100 -112.2600      16.2        38       136        60
OIR    2025250     91400   17.5100 -112.2700      16.2        38       136        60
OIR    2025250     91400   17.5100 -112.2800      16.3        37       136        60
OIR    2025250     91400   17.5100 -112.2900      16.3        36       136        60
OIR    2025250     91400   17.5100 -112.3000      16.3        35       135        60
OIR    2025250     91400   17.5100 -112.3100      16.4        34       135        60
OIR    2025250     91400   17.5100 -112.3200      16.5        32       136        60
OIR    2025250     91400   17.5100 -112.3300      16.6        31       136        60
OIR    2025250     91400   17.5100 -112.3400      16.7        29       137        60
OIR    2025250     91400   17.5100 -112.3500      16.8        28       138        60
OIR    2025250     91400   17.5100 -112.3600      16.8        28       137        60
OIR    2025250     91400   17.5100 -112.3700      16.9        27       136        60
OIR    2025250     91400   17.5100 -112.3800      16.9        27       136        60
OIR    2025250     91400   17.5100 -112.3900      16.9        26       137        60
OIR    2025250     91400   17.5100 -112.4000      16.9        26       138        60
OIR    2025250     91400   17.5100 -112.4100      16.9        25       138        60
OIR    2025250     91400   17.5100 -112.4200      16.9        25       138        60
OIR    2025250     91400   17.5100 -112.4300      16.9        25       137        60
OIR    2025250     91400   17.5100 -112.4400      16.9        25       135        60
OIR    2025250     91400   17.5100 -112.4500      17.0        25       134        60
OIR    2025250     91400   17.5100 -112.4600      16.9        25       133        60
OIR    2025250     91400   17.5100 -112.4700      16.9        25       133        60
OIR    2025250     91400   17.5100 -112.4800      16.9        25       133        60
OIR    2025250     91400   17.5100 -112.4900      16.9        25       133        60
OIR    2025250     91400   17.5100 -112.5000      16.9        25       133        60
OIR    2025250     91400   17.5100 -112.5100      16.8        25       133        60
OIR    2025250     91400   17.5100 -112.5200      16.8        25       134        60
OIR    2025250     91400   17.5100 -112.5300      16.8        25       137        60
OIR    2025250     91400   17.5100 -112.5400      16.7        25       138        60
OIR    2025250     91400   17.5100 -112.5500      16.7        25       136        60
OIR    2025250     91400   17.5100 -112.5600      16.7        25       134        60
OIR    2025250     91400   17.5100 -112.5700      16.6        25       135        60
OIR    2025250     91400   17.5100 -112.5800      16.6        25       136        60
OIR    2025250     91400   17.5100 -112.5900      16.5        25       136        60
OIR    2025250     91400   17.5100 -112.6000      16.4        25       136        60
OIR    2025250     91400   17.5100 -112.6100      16.2        24       136        60
OIR    2025250     91400   17.5100 -112.6200      16.0        24       136        60
OIR    2025250     91400   17.5100 -112.6300      15.8        24       135        60
OIR    2025250     91400   17.5100 -112.6400      15.6        24       135        60
OIR    2025250     91400   17.5100 -112.6500      15.5        24       134        60
OIR    2025250     91400   17.5100 -112.6600      15.3        24       134        60
OIR    2025250     91400   17.5100 -112.6700      15.1        24       133        60
OIR    2025250     91400   17.5100 -112.6800      15.0        24       134        60
OIR    2025250     91400   17.5100 -112.6900      15.0        24       136        60
OIR    2025250     91400   17.5100 -112.7000      14.9        24       138        60
OIR    2025250     91400   17.5100 -112.7100      14.9        24       137        60
OIR    2025250     91400   17.5100 -112.7200      14.8        24       135        60
OIR    2025250     91400   17.5100 -112.7300      14.8        24       136        60
OIR    2025250     91400   17.5100 -112.7400      14.8        24       137        60
OIR    2025250     91400   17.5100 -112.7500      14.8        24       138        60
OIR    2025250     91400   17.5100 -112.7600      14.7        24       140        60
OIR    2025250     91400   17.5100 -112.7700      14.7        25       141        60
OIR    2025250     91400   17.5100 -112.7800      14.6        25       143        60
OIR    2025250     91400   17.5100 -112.8600      14.4        25       143        60
OIR    2025250     91400   17.5100 -112.8700      14.4        25       143        60
OIR    2025250     91400   17.5100 -112.8800      14.4        26       142        60
OIR    2025250     91400   17.5100 -112.8900      14.4        26       144        60
OIR    2025250     91400   17.5100 -112.9400      14.3        27       142        60
OIR    2025250     91400   17.5100 -112.9500      14.3        27       141        60
OIR    2025250     91400   17.5100 -112.9600      14.2        27       140        60
OIR    2025250     91400   17.5100 -112.9700      14.1        27       140        60
OIR    2025250     91400   17.5100 -112.9800      14.0        27       142        60
OIR    2025250     91400   17.5100 -112.9900      13.9        27       143        60
OIR    2025250     91400   17.5100 -113.1000      11.4        23       144        60
OIR    2025250     91400   17.5100 -113.1100      11.4        23       141        60
OIR    2025250     91400   17.5100 -113.1200      11.4        23       143        60
OIR    2025250     91400   17.5100 -113.2500      12.8        21       142        60
OIR    2025250     91400   17.5100 -113.2600      12.9        21       142        60
OIR    2025250     91400   17.5100 -113.2700      12.9        21       143        60
OIR    2025250     91400   17.5100 -113.3100      13.2        22       143        60
OIR    2025250     91400   17.5100 -113.3200      13.4        23       141        60
OIR    2025250     91400   17.5100 -113.3300      13.6        24       141        60
OIR    2025250     91400   17.5100 -113.3400      13.6        24       141        60
OIR    2025250     91400   17.5100 -113.3500      13.7        24       141        60
OIR    2025250     91400   17.5100 -113.3600      13.7        24       142        60
OIR    2025250     91400   17.5100 -113.3700      13.7        24       140        60
OIR    2025250     91400   17.5100 -113.3800      13.7        24       139        60
OIR    2025250     91400   17.5100 -113.3900      13.7        24       138        60
OIR    2025250     91400   17.5100 -113.4000      13.7        23       138        60
OIR    2025250     91400   17.5100 -113.4100      13.7        23       139        60
OIR    2025250     91400   17.5100 -113.4200      13.7        23       141        60
OIR    2025250     91400   17.5100 -113.4300      13.6        23       142        60
OIR    2025250     91400   17.5100 -113.4400      13.6        23       144        60
OIR    2025250     91400   17.5100 -113.5500      12.9        18       144        60
OIR    2025250     91400   17.5100 -113.5600      12.8        18       144        60
OIR    2025250     91400   17.5100 -113.5700      12.8        17       143        60
OIR    2025250     91400   17.5100 -113.5800      12.8        17       141        60
OIR    2025250     91400   17.5100 -113.5900      12.8        16       139        60
OIR    2025250     91400   17.5100 -113.6000      12.8        15       138        60
OIR    2025250     91400   17.5100 -113.6100      12.8        14       136        60
OIR    2025250     91400   17.5100 -113.6200      12.8        13       137        60
OIR    2025250     91400   17.5100 -113.6300      12.8        11       139        60
OIR    2025250     91400   17.5100 -113.6400      12.9        10       139        60
OIR    2025250     91400   17.5100 -113.6500      13.1         9       138        60
OIR    2025250     91400   17.5100 -113.6600      13.2         8       136        60
OIR    2025250     91400   17.5100 -113.6700      13.2         8       138        60
OIR    2025250     91400   17.5100 -113.6800      13.3         8       139        60
OIR    2025250     91400   17.5100 -113.6900      13.3         8       143        60
OIR    2025250     91400   17.5100 -113.7200      13.3         8       143        60
OIR    2025250     91400   17.5100 -113.7300      13.2         7       140        60
OIR    2025250     91400   17.5100 -113.7400      13.1         7       135        60
OIR    2025250     91400   17.5100 -113.7500      13.0         7       134        60
OIR    2025250     91400   17.5100 -113.7600      13.0         7       139        60
OIR    2025250     91400   17.5000 -111.4600      15.5        49       139        60
OIR    2025250     91400   17.5000 -111.4700      15.6        48       134        60
OIR    2025250     91400   17.5000 -111.4800      15.6        47       135        60
OIR    2025250     91400   17.5000 -111.4900      15.6        47       137        60
OIR    2025250     91400   17.5000 -111.5000      15.6        46       136        60
OIR    2025250     91400   17.5000 -111.5100      15.6        46       134        60
OIR    2025250     91400   17.5000 -111.5200      15.6        46       135        60
OIR    2025250     91400   17.5000 -111.5300      15.6        46       137        60
OIR    2025250     91400   17.5000 -111.5400      15.6        46       140        60
OIR    2025250     91400   17.5000 -112.2500      16.3        40       141        60
OIR    2025250     91400   17.5000 -112.2600      16.4        39       136        60
OIR    2025250     91400   17.5000 -112.2700      16.4        38       134        60
OIR    2025250     91400   17.5000 -112.2800      16.5        37       134        60
OIR    2025250     91400   17.5000 -112.2900      16.6        37       135        60
OIR    2025250     91400   17.5000 -112.3000      16.6        36       136        60
OIR    2025250     91400   17.5000 -112.3100      16.6        34       137        60
OIR    2025250     91400   17.5000 -112.3200      16.7        33       138        60
OIR    2025250     91400   17.5000 -112.3300      16.8        31       138        60
OIR    2025250     91400   17.5000 -112.3400      16.8        30       139        60
OIR    2025250     91400   17.5000 -112.3500      16.9        29       140        60
OIR    2025250     91400   17.5000 -112.3600      16.9        28       139        60
OIR    2025250     91400   17.5000 -112.3700      16.9        28       137        60
OIR    2025250     91400   17.5000 -112.3800      17.0        27       136        60
OIR    2025250     91400   17.5000 -112.3900      17.0        27       136        60
OIR    2025250     91400   17.5000 -112.4000      17.0        26       136        60
OIR    2025250     91400   17.5000 -112.4100      17.0        26       136        60
OIR    2025250     91400   17.5000 -112.4200      17.0        25       136        60
OIR    2025250     91400   17.5000 -112.4300      17.0        25       136        60
OIR    2025250     91400   17.5000 -112.4400      17.0        25       135        60
OIR    2025250     91400   17.5000 -112.4500      17.0        25       134        60
OIR    2025250     91400   17.5000 -112.4600      17.0        25       134        60
OIR    2025250     91400   17.5000 -112.4700      17.0        25       134        60
OIR    2025250     91400   17.5000 -112.4800      16.9        25       134        60
OIR    2025250     91400   17.5000 -112.4900      16.9        25       134        60
OIR    2025250     91400   17.5000 -112.5000      16.9        25       134        60
OIR    2025250     91400   17.5000 -112.5100      16.9        25       135        60
OIR    2025250     91400   17.5000 -112.5200      16.8        25       136        60
OIR    2025250     91400   17.5000 -112.5300      16.8        25       137        60
OIR    2025250     91400   17.5000 -112.5400      16.8        25       138        60
OIR    2025250     91400   17.5000 -112.5500      16.7        25       138        60
OIR    2025250     91400   17.5000 -112.5600      16.7        25       137        60
OIR    2025250     91400   17.5000 -112.5700      16.7        25       136        60
OIR    2025250     91400   17.5000 -112.5800      16.6        25       135        60
OIR    2025250     91400   17.5000 -112.5900      16.6        25       135        60
OIR    2025250     91400   17.5000 -112.6000      16.5        25       135        60
OIR    2025250     91400   17.5000 -112.6100      16.4        25       135        60
OIR    2025250     91400   17.5000 -112.6200      16.2        24       136        60
OIR    2025250     91400   17.5000 -112.6300      15.9        24       136        60
OIR    2025250     91400   17.5000 -112.6400      15.8        24       137        60
OIR    2025250     91400   17.5000 -112.6500      15.6        24       138        60
OIR    2025250     91400   17.5000 -112.6600      15.4        24       138        60
OIR    2025250     91400   17.5000 -112.6700      15.2        24       139        60
OIR    2025250     91400   17.5000 -112.6800      15.1        24       139        60
OIR    2025250     91400   17.5000 -112.6900      15.0        24       138        60
OIR    2025250     91400   17.5000 -112.7000      15.0        24       139        60
OIR    2025250     91400   17.5000 -112.7100      14.9        24       138        60
OIR    2025250     91400   17.5000 -112.7200      14.8        24       136        60
OIR    2025250     91400   17.5000 -112.7300      14.8        24       136        60
OIR    2025250     91400   17.5000 -112.7400      14.8        24       137        60
OIR    2025250     91400   17.5000 -112.7500      14.8        24       138        60
OIR    2025250     91400   17.5000 -112.7600      14.7        25       138        60
OIR    2025250     91400   17.5000 -112.7700      14.7        25       139        60
OIR    2025250     91400   17.5000 -112.7800      14.6        25       141        60
OIR    2025250     91400   17.5000 -112.7900      14.6        25       143        60
OIR    2025250     91400   17.5000 -112.9200      14.5        26       143        60
OIR    2025250     91400   17.5000 -112.9300      14.5        27       141        60
OIR    2025250     91400   17.5000 -112.9400      14.4        27       140        60
OIR    2025250     91400   17.5000 -112.9500      14.4        27       140        60
OIR    2025250     91400   17.5000 -112.9600      14.3        27       140        60
OIR    2025250     91400   17.5000 -112.9700      14.3        28       140        60
OIR    2025250     91400   17.5000 -112.9800      14.2        28       140        60
OIR    2025250     91400   17.5000 -112.9900      14.1        28       141        60
OIR    2025250     91400   17.5000 -113.0000      14.0        28       141        60
OIR    2025250     91400   17.5000 -113.0100      13.9        28       142        60
OIR    2025250     91400   17.5000 -113.0200      13.8        28       142        60
OIR    2025250     91400   17.5000 -113.0300      13.6        28       142        60
OIR    2025250     91400   17.5000 -113.0400      13.4        28       141        60
OIR    2025250     91400   17.5000 -113.0500      13.2        27       142        60
OIR    2025250     91400   17.5000 -113.0600      12.8        27       142        60
OIR    2025250     91400   17.5000 -113.0700      12.5        26       143        60
OIR    2025250     91400   17.5000 -113.1100      12.0        25       143        60
OIR    2025250     91400   17.5000 -113.2500      13.1        22       144        60
OIR    2025250     91400   17.5000 -113.2600      13.1        22       143        60
OIR    2025250     91400   17.5000 -113.2700      13.2        22       143        60
OIR    2025250     91400   17.5000 -113.2800      13.3        23       143        60
OIR    2025250     91400   17.5000 -113.3100      13.7        23       143        60
OIR    2025250     91400   17.5000 -113.3200      13.8        24       141        60
OIR    2025250     91400   17.5000 -113.3300      13.8        24       141        60
OIR    2025250     91400   17.5000 -113.3400      13.8        24       140        60
OIR    2025250     91400   17.5000 -113.3500      13.7        24       140        60
OIR    2025250     91400   17.5000 -113.3600      13.7        24       140        60
OIR    2025250     91400   17.5000 -113.3700      13.7        24       139        60
OIR    2025250     91400   17.5000 -113.3800      13.7        24       138        60
OIR    2025250     91400   17.5000 -113.3900      13.7        24       138        60
OIR    2025250     91400   17.5000 -113.4000      13.7        24       140        60
OIR    2025250     91400   17.5000 -113.4100      13.7        23       141        60
OIR    2025250     91400   17.5000 -113.4200      13.7        23       142        60
OIR    2025250     91400   17.5000 -113.4300      13.7        23       143        60
OIR    2025250     91400   17.5000 -113.5600      13.1        18       144        60
OIR    2025250     91400   17.5000 -113.5700      13.0        17       144        60
OIR    2025250     91400   17.5000 -113.5800      13.0        17       141        60
OIR    2025250     91400   17.5000 -113.5900      13.0        16       138        60
OIR    2025250     91400   17.5000 -113.6000      12.9        15       137        60
OIR    2025250     91400   17.5000 -113.6100      12.9        14       137        60
OIR    2025250     91400   17.5000 -113.6200      12.9        12       138        60
OIR    2025250     91400   17.5000 -113.6300      13.0        11       140        60
OIR    2025250     91400   17.5000 -113.6400      13.1         9       141        60
OIR    2025250     91400   17.5000 -113.6500      13.2         8       141        60
OIR    2025250     91400   17.5000 -113.6600      13.2         8       141        60
OIR    2025250     91400   17.5000 -113.6700      13.3         8       143        60
OIR    2025250     91400   17.5000 -113.7200      13.3         8       139        60
OIR    2025250     91400   17.5000 -113.7300      13.3         8       136        60
OIR    2025250     91400   17.5000 -113.7400      13.3         8       136        60
OIR    2025250     91400   17.5000 -113.7500      13.3         8       136        60
OIR    2025250     91400   17.5000 -113.7600      13.3         8       141        60
OIR    2025250     91400   17.4900 -111.4600      15.4        49       142        60
OIR    2025250     91400   17.4900 -111.4700      15.4        48       140        60
OIR    2025250     91400   17.4900 -111.4800      15.5        47       137        60
OIR    2025250     91400   17.4900 -111.4900      15.5        47       134        60
OIR    2025250     91400   17.4900 -111.5000      15.5        46       132        60
OIR    2025250     91400   17.4900 -111.5100      15.5        46       130        60
OIR    2025250     91400   17.4900 -111.5200      15.5        46       130        60
OIR    2025250     91400   17.4900 -111.5300      15.5        46       133        60
OIR    2025250     91400   17.4900 -111.5400      15.5        46       136        60
OIR    2025250     91400   17.4900 -111.5500      15.5        46       141        60
OIR    2025250     91400   17.4900 -112.2500      16.6        40       142        60
OIR    2025250     91400   17.4900 -112.2600      16.6        39       139        60
OIR    2025250     91400   17.4900 -112.2700      16.7        38       137        60
OIR    2025250     91400   17.4900 -112.2800      16.7        38       135        60
OIR    2025250     91400   17.4900 -112.2900      16.8        37       135        60
OIR    2025250     91400   17.4900 -112.3000      16.8        36       137        60
OIR    2025250     91400   17.4900 -112.3100      16.8        35       138        60
OIR    2025250     91400   17.4900 -112.3200      16.8        34       139        60
OIR    2025250     91400   17.4900 -112.3300      16.9        32       139        60
OIR    2025250     91400   17.4900 -112.3400      16.9        31       139        60
OIR    2025250     91400   17.4900 -112.3500      16.9        30       139        60
OIR    2025250     91400   17.4900 -112.3600      16.9        29       139        60
OIR    2025250     91400   17.4900 -112.3700      17.0        29       137        60
OIR    2025250     91400   17.4900 -112.3800      17.0        28       136        60
OIR    2025250     91400   17.4900 -112.3900      17.0        27       136        60
OIR    2025250     91400   17.4900 -112.4000      17.0        27       136        60
OIR    2025250     91400   17.4900 -112.4100      17.0        26       135        60
OIR    2025250     91400   17.4900 -112.4200      17.0        26       135        60
OIR    2025250     91400   17.4900 -112.4300      17.0        25       135        60
OIR    2025250     91400   17.4900 -112.4400      17.0        25       135        60
OIR    2025250     91400   17.4900 -112.4500      17.0        25       135        60
OIR    2025250     91400   17.4900 -112.4600      17.0        25       135        60
OIR    2025250     91400   17.4900 -112.4700      17.0        25       135        60
OIR    2025250     91400   17.4900 -112.4800      17.0        25       135        60
OIR    2025250     91400   17.4900 -112.4900      17.0        25       135        60
OIR    2025250     91400   17.4900 -112.5000      16.9        25       136        60
OIR    2025250     91400   17.4900 -112.5100      16.9        25       137        60
OIR    2025250     91400   17.4900 -112.5200      16.9        25       139        60
OIR    2025250     91400   17.4900 -112.5300      16.8        25       139        60
OIR    2025250     91400   17.4900 -112.5400      16.8        25       138        60
OIR    2025250     91400   17.4900 -112.5500      16.8        25       139        60
OIR    2025250     91400   17.4900 -112.5600      16.7        25       140        60
OIR    2025250     91400   17.4900 -112.5700      16.7        25       139        60
OIR    2025250     91400   17.4900 -112.5800      16.7        25       136        60
OIR    2025250     91400   17.4900 -112.5900      16.6        25       134        60
OIR    2025250     91400   17.4900 -112.6000      16.5        25       134        60
OIR    2025250     91400   17.4900 -112.6100      16.4        25       134        60
OIR    2025250     91400   17.4900 -112.6200      16.3        25       135        60
OIR    2025250     91400   17.4900 -112.6300      16.1        25       136        60
OIR    2025250     91400   17.4900 -112.6400      15.9        25       138        60
OIR    2025250     91400   17.4900 -112.6500      15.7        25       141        60
OIR    2025250     91400   17.4900 -112.6600      15.6        24       144        60
OIR    2025250     91400   17.4900 -112.6700      15.3        24       145        60
OIR    2025250     91400   17.4900 -112.6800      15.1        24       145        60
OIR    2025250     91400   17.4900 -112.6900      15.1        24       141        60
OIR    2025250     91400   17.4900 -112.7000      15.0        24       139        60
OIR    2025250     91400   17.4900 -112.7100      14.9        24       138        60
OIR    2025250     91400   17.4900 -112.7200      14.9        24       138        60
OIR    2025250     91400   17.4900 -112.7300      14.9        25       138        60
OIR    2025250     91400   17.4900 -112.7400      14.8        25       139        60
OIR    2025250     91400   17.4900 -112.7500      14.8        25       140        60
OIR    2025250     91400   17.4900 -112.7600      14.8        25       140        60
OIR    2025250     91400   17.4900 -112.7700      14.7        25       141        60
OIR    2025250     91400   17.4900 -112.7800      14.7        25       142        60
OIR    2025250     91400   17.4900 -112.9000      14.5        26       144        60
OIR    2025250     91400   17.4900 -112.9100      14.5        27       143        60
OIR    2025250     91400   17.4900 -112.9200      14.5        27       143        60
OIR    2025250     91400   17.4900 -112.9300      14.5        27       143        60
OIR    2025250     91400   17.4900 -112.9400      14.5        27       143        60
OIR    2025250     91400   17.4900 -112.9500      14.5        28       142        60
OIR    2025250     91400   17.4900 -112.9600      14.5        28       142        60
OIR    2025250     91400   17.4900 -112.9700      14.4        28       143        60
OIR    2025250     91400   17.4900 -112.9800      14.4        28       143        60
OIR    2025250     91400   17.4900 -112.9900      14.3        28       143        60
OIR    2025250     91400   17.4900 -113.0000      14.2        28       143        60
OIR    2025250     91400   17.4900 -113.0100      14.1        28       142        60
OIR    2025250     91400   17.4900 -113.0200      14.0        28       141        60
OIR    2025250     91400   17.4900 -113.0300      13.8        28       142        60
OIR    2025250     91400   17.4900 -113.0400      13.7        28       142        60
OIR    2025250     91400   17.4900 -113.0500      13.6        28       142        60
OIR    2025250     91400   17.4900 -113.0600      13.5        28       142        60
OIR    2025250     91400   17.4900 -113.0700      13.3        27       142        60
OIR    2025250     91400   17.4900 -113.2700      13.7        24       143        60
OIR    2025250     91400   17.4900 -113.2800      13.7        24       143        60
OIR    2025250     91400   17.4900 -113.2900      13.8        24       143        60
OIR    2025250     91400   17.4900 -113.3000      13.8        24       144        60
OIR    2025250     91400   17.4900 -113.3100      13.8        24       143        60
OIR    2025250     91400   17.4900 -113.3200      13.8        24       142        60
OIR    2025250     91400   17.4900 -113.3300      13.8        24       141        60
OIR    2025250     91400   17.4900 -113.3400      13.8        24       141        60
OIR    2025250     91400   17.4900 -113.3500      13.8        24       139        60
OIR    2025250     91400   17.4900 -113.3600      13.8        24       137        60
OIR    2025250     91400   17.4900 -113.3700      13.8        24       137        60
OIR    2025250     91400   17.4900 -113.3800      13.8        24       137        60
OIR    2025250     91400   17.4900 -113.3900      13.8        24       138        60
OIR    2025250     91400   17.4900 -113.4000      13.8        24       142        60
OIR    2025250     91400   17.4900 -113.5400      13.2        18       144        60
OIR    2025250     91400   17.4900 -113.5500      13.2        18       143        60
OIR    2025250     91400   17.4900 -113.5600      13.2        17       142        60
OIR    2025250     91400   17.4900 -113.5700      13.2        17       141        60
OIR    2025250     91400   17.4900 -113.5800      13.1        17       140        60
OIR    2025250     91400   17.4900 -113.5900      13.1        16       140        60
OIR    2025250     91400   17.4900 -113.6000      13.1        15       138        60
OIR    2025250     91400   17.4900 -113.6100      13.0        13       136        60
OIR    2025250     91400   17.4900 -113.6200      13.0        12       135        60
OIR    2025250     91400   17.4900 -113.6300      13.1        11       137        60
OIR    2025250     91400   17.4900 -113.6400      13.1         9       139        60
OIR    2025250     91400   17.4900 -113.6500      13.2         8       139        60
OIR    2025250     91400   17.4900 -113.6600      13.3         8       140        60
OIR    2025250     91400   17.4900 -113.6700      13.3         8       142        60
OIR    2025250     91400   17.4900 -113.7200      13.4         8       143        60
OIR    2025250     91400   17.4900 -113.7300      13.4         8       138        60
OIR    2025250     91400   17.4900 -113.7400      13.4         8       137        60
OIR    2025250     91400   17.4900 -113.7500      13.3         8       136        60
OIR    2025250     91400   17.4900 -113.7600      13.3         8       140        60
OIR    2025250     91400   17.4800 -111.4800      15.3        47       139        60
OIR    2025250     91400   17.4800 -111.4900      15.4        47       133        60
OIR    2025250     91400   17.4800 -111.5000      15.4        46       128        60
OIR    2025250     91400   17.4800 -111.5100      15.5        46       126        60
OIR    2025250     91400   17.4800 -111.5200      15.5        46       125        60
OIR    2025250     91400   17.4800 -111.5300      15.5        46       129        60
OIR    2025250     91400   17.4800 -111.5400      15.5        46       133        60
OIR    2025250     91400   17.4800 -111.5500      15.5        46       136        60
OIR    2025250     91400   17.4800 -111.5600      15.5        46       140        60
OIR    2025250     91400   17.4800 -111.5700      15.5        46       144        60
OIR    2025250     91400   17.4800 -112.1700      15.9        43       144        60
OIR    2025250     91400   17.4800 -112.1800      16.0        43       144        60
OIR    2025250     91400   17.4800 -112.2400      16.6        41       143        60
OIR    2025250     91400   17.4800 -112.2500      16.8        40       142        60
OIR    2025250     91400   17.4800 -112.2600      16.9        39       141        60
OIR    2025250     91400   17.4800 -112.2700      16.9        39       140        60
OIR    2025250     91400   17.4800 -112.2800      17.0        38       138        60
OIR    2025250     91400   17.4800 -112.2900      17.0        38       137        60
OIR    2025250     91400   17.4800 -112.3000      17.0        37       137        60
OIR    2025250     91400   17.4800 -112.3100      17.0        36       138        60
OIR    2025250     91400   17.4800 -112.3200      17.0        35       139        60
OIR    2025250     91400   17.4800 -112.3300      17.0        33       139        60
OIR    2025250     91400   17.4800 -112.3400      17.0        32       138        60
OIR    2025250     91400   17.4800 -112.3500      17.0        31       137        60
OIR    2025250     91400   17.4800 -112.3600      17.0        30       135        60
OIR    2025250     91400   17.4800 -112.3700      17.0        29       136        60
OIR    2025250     91400   17.4800 -112.3800      17.0        28       136        60
OIR    2025250     91400   17.4800 -112.3900      17.0        28       137        60
OIR    2025250     91400   17.4800 -112.4000      17.1        27       138        60
OIR    2025250     91400   17.4800 -112.4100      17.1        26       137        60
OIR    2025250     91400   17.4800 -112.4200      17.1        26       135        60
OIR    2025250     91400   17.4800 -112.4300      17.1        26       134        60
OIR    2025250     91400   17.4800 -112.4400      17.1        25       135        60
OIR    2025250     91400   17.4800 -112.4500      17.1        25       135        60
OIR    2025250     91400   17.4800 -112.4600      17.1        25       135        60
OIR    2025250     91400   17.4800 -112.4700      17.1        25       136        60
OIR    2025250     91400   17.4800 -112.4800      17.0        25       137        60
OIR    2025250     91400   17.4800 -112.4900      17.0        25       138        60
OIR    2025250     91400   17.4800 -112.5000      17.0        25       138        60
OIR    2025250     91400   17.4800 -112.5100      16.9        25       138        60
OIR    2025250     91400   17.4800 -112.5200      16.9        25       138        60
OIR    2025250     91400   17.4800 -112.5300      16.9        25       139        60
OIR    2025250     91400   17.4800 -112.5400      16.8        25       139        60
OIR    2025250     91400   17.4800 -112.5500      16.8        25       140        60
OIR    2025250     91400   17.4800 -112.5600      16.8        25       140        60
OIR    2025250     91400   17.4800 -112.5700      16.7        25       140        60
OIR    2025250     91400   17.4800 -112.5800      16.7        25       138        60
OIR    2025250     91400   17.4800 -112.5900      16.6        25       137        60
OIR    2025250     91400   17.4800 -112.6000      16.6        25       136        60
OIR    2025250     91400   17.4800 -112.6100      16.5        25       136        60
OIR    2025250     91400   17.4800 -112.6200      16.4        25       136        60
OIR    2025250     91400   17.4800 -112.6300      16.2        25       137        60
OIR    2025250     91400   17.4800 -112.6400      16.0        25       139        60
OIR    2025250     91400   17.4800 -112.6500      15.9        25       142        60
OIR    2025250     91400   17.4800 -112.6600      15.7        25       145        60
OIR    2025250     91400   17.4800 -112.6900      15.1        24       144        60
OIR    2025250     91400   17.4800 -112.7000      15.0        24       140        60
OIR    2025250     91400   17.4800 -112.7100      14.9        25       139        60
OIR    2025250     91400   17.4800 -112.7200      14.9        25       138        60
OIR    2025250     91400   17.4800 -112.7300      14.9        25       138        60
OIR    2025250     91400   17.4800 -112.7400      14.9        25       139        60
OIR    2025250     91400   17.4800 -112.7500      14.8        25       139        60
OIR    2025250     91400   17.4800 -112.7600      14.8        25       140        60
OIR    2025250     91400   17.4800 -112.7700      14.7        25       141        60
OIR    2025250     91400   17.4800 -112.7800      14.7        25       143        60
OIR    2025250     91400   17.4800 -112.9000      14.6        27       143        60
OIR    2025250     91400   17.4800 -112.9100      14.6        27       140        60
OIR    2025250     91400   17.4800 -112.9200      14.6        27       142        60
OIR    2025250     91400   17.4800 -113.0200      14.2        29       142        60
OIR    2025250     91400   17.4800 -113.0300      14.1        29       142        60
OIR    2025250     91400   17.4800 -113.0700      13.8        28       142        60
OIR    2025250     91400   17.4800 -113.0800      13.7        28       143        60
OIR    2025250     91400   17.4800 -113.0900      13.7        27       143        60
OIR    2025250     91400   17.4800 -113.1000      13.7        27       143        60
OIR    2025250     91400   17.4800 -113.1100      13.7        27       143        60
OIR    2025250     91400   17.4800 -113.1200      13.7        27       144        60
OIR    2025250     91400   17.4800 -113.2800      13.9        24       144        60
OIR    2025250     91400   17.4800 -113.2900      13.9        24       144        60
OIR    2025250     91400   17.4800 -113.3000      13.9        24       144        60
OIR    2025250     91400   17.4800 -113.3100      13.9        24       143        60
OIR    2025250     91400   17.4800 -113.3200      13.8        24       143        60
OIR    2025250     91400   17.4800 -113.3300      13.8        24       142        60
OIR    2025250     91400   17.4800 -113.3400      13.8        24       142        60
OIR    2025250     91400   17.4800 -113.3500      13.8        24       141        60
OIR    2025250     91400   17.4800 -113.3600      13.8        24       139        60
OIR    2025250     91400   17.4800 -113.3700      13.8        24       138        60
OIR    2025250     91400   17.4800 -113.3800      13.8        24       140        60
OIR    2025250     91400   17.4800 -113.3900      13.8        24       141        60
OIR    2025250     91400   17.4800 -113.4000      13.8        24       143        60
OIR    2025250     91400   17.4800 -113.5300      13.2        19       144        60
OIR    2025250     91400   17.4800 -113.5400      13.2        18       143        60
OIR    2025250     91400   17.4800 -113.5500      13.2        18       142        60
OIR    2025250     91400   17.4800 -113.5600      13.2        17       141        60
OIR    2025250     91400   17.4800 -113.5700      13.2        17       140        60
OIR    2025250     91400   17.4800 -113.5800      13.3        16       140        60
OIR    2025250     91400   17.4800 -113.5900      13.2        16       140        60
OIR    2025250     91400   17.4800 -113.6000      13.2        14       139        60
OIR    2025250     91400   17.4800 -113.6100      13.1        13       135        60
OIR    2025250     91400   17.4800 -113.6200      13.1        12       132        60
OIR    2025250     91400   17.4800 -113.6300      13.1        11       134        60
OIR    2025250     91400   17.4800 -113.6400      13.2         9       136        60
OIR    2025250     91400   17.4800 -113.6500      13.3         8       137        60
OIR    2025250     91400   17.4800 -113.6600      13.4         8       137        60
OIR    2025250     91400   17.4800 -113.6700      13.4         8       140        60
OIR    2025250     91400   17.4800 -113.6800      13.4         8       143        60
OIR    2025250     91400   17.4800 -113.7400      13.4         8       141        60
OIR    2025250     91400   17.4800 -113.7500      13.4         8       137        60
OIR    2025250     91400   17.4800 -113.7600      13.4         8       137        60
OIR    2025250     91400   17.4800 -113.7700      13.4         8       143        60
OIR    2025250     91400   17.4700 -111.4900      15.3        47       140        60
OIR    2025250     91400   17.4700 -111.5000      15.4        47       135        60
OIR    2025250     91400   17.4700 -111.5100      15.4        46       133        60
OIR    2025250     91400   17.4700 -111.5200      15.4        46       130        60
OIR    2025250     91400   17.4700 -111.5300      15.4        46       129        60
OIR    2025250     91400   17.4700 -111.5400      15.4        46       129        60
OIR    2025250     91400   17.4700 -111.5500      15.5        46       132        60
OIR    2025250     91400   17.4700 -111.5600      15.5        46       137        60
OIR    2025250     91400   17.4700 -111.5700      15.5        46       143        60
OIR    2025250     91400   17.4700 -112.1600      15.6        44       144        60
OIR    2025250     91400   17.4700 -112.1700      15.9        43       141        60
OIR    2025250     91400   17.4700 -112.1800      16.1        43       141        60
OIR    2025250     91400   17.4700 -112.1900      16.1        43       143        60
OIR    2025250     91400   17.4700 -112.2400      16.8        41       143        60
OIR    2025250     91400   17.4700 -112.2500      17.0        40       141        60
OIR    2025250     91400   17.4700 -112.2600      17.0        39       140        60
OIR    2025250     91400   17.4700 -112.2700      17.1        39       139        60
OIR    2025250     91400   17.4700 -112.2800      17.1        38       138        60
OIR    2025250     91400   17.4700 -112.2900      17.2        38       137        60
OIR    2025250     91400   17.4700 -112.3000      17.1        38       138        60
OIR    2025250     91400   17.4700 -112.3100      17.1        37       138        60
OIR    2025250     91400   17.4700 -112.3200      17.1        35       138        60
OIR    2025250     91400   17.4700 -112.3300      17.1        34       137        60
OIR    2025250     91400   17.4700 -112.3400      17.1        33       137        60
OIR    2025250     91400   17.4700 -112.3500      17.1        32       135        60
OIR    2025250     91400   17.4700 -112.3600      17.1        31       134        60
OIR    2025250     91400   17.4700 -112.3700      17.1        30       135        60
OIR    2025250     91400   17.4700 -112.3800      17.1        29       135        60
OIR    2025250     91400   17.4700 -112.3900      17.1        28       137        60
OIR    2025250     91400   17.4700 -112.4000      17.2        27       138        60
OIR    2025250     91400   17.4700 -112.4100      17.2        27       138        60
OIR    2025250     91400   17.4700 -112.4200      17.2        26       137        60
OIR    2025250     91400   17.4700 -112.4300      17.2        26       135        60
OIR    2025250     91400   17.4700 -112.4400      17.2        26       135        60
OIR    2025250     91400   17.4700 -112.4500      17.2        25       135        60
OIR    2025250     91400   17.4700 -112.4600      17.2        25       136        60
OIR    2025250     91400   17.4700 -112.4700      17.2        25       137        60
OIR    2025250     91400   17.4700 -112.4800      17.1        25       139        60
OIR    2025250     91400   17.4700 -112.4900      17.1        25       140        60
OIR    2025250     91400   17.4700 -112.5000      17.0        25       141        60
OIR    2025250     91400   17.4700 -112.5100      17.0        25       139        60
OIR    2025250     91400   17.4700 -112.5200      17.0        25       138        60
OIR    2025250     91400   17.4700 -112.5300      16.9        25       139        60
OIR    2025250     91400   17.4700 -112.5400      16.9        25       140        60
OIR    2025250     91400   17.4700 -112.5500      16.8        25       140        60
OIR    2025250     91400   17.4700 -112.5600      16.8        25       140        60
OIR    2025250     91400   17.4700 -112.5700      16.7        25       140        60
OIR    2025250     91400   17.4700 -112.5800      16.7        25       140        60
OIR    2025250     91400   17.4700 -112.5900      16.7        25       141        60
OIR    2025250     91400   17.4700 -112.6000      16.6        25       140        60
OIR    2025250     91400   17.4700 -112.6100      16.5        25       140        60
OIR    2025250     91400   17.4700 -112.6200      16.4        25       139        60
OIR    2025250     91400   17.4700 -112.6300      16.3        25       139        60
OIR    2025250     91400   17.4700 -112.6400      16.1        25       140        60
OIR    2025250     91400   17.4700 -112.6500      15.9        25       142        60
OIR    2025250     91400   17.4700 -112.6600      15.8        25       145        60
OIR    2025250     91400   17.4700 -112.7000      15.0        25       142        60
OIR    2025250     91400   17.4700 -112.7100      15.0        25       139        60
OIR    2025250     91400   17.4700 -112.7200      14.9        25       137        60
OIR    2025250     91400   17.4700 -112.7300      14.9        25       136        60
OIR    2025250     91400   17.4700 -112.7400      14.9        25       136        60
OIR    2025250     91400   17.4700 -112.7500      14.8        25       137        60
OIR    2025250     91400   17.4700 -112.7600      14.8        25       139        60
OIR    2025250     91400   17.4700 -112.7700      14.8        25       140        60
OIR    2025250     91400   17.4700 -112.7800      14.7        25       142        60
OIR    2025250     91400   17.4700 -112.7900      14.7        25       142        60
OIR    2025250     91400   17.4700 -112.8000      14.6        25       144        60
OIR    2025250     91400   17.4700 -112.9100      14.7        27       143        60
OIR    2025250     91400   17.4700 -112.9200      14.7        27       143        60
OIR    2025250     91400   17.4700 -112.9300      14.7        28       144        60
OIR    2025250     91400   17.4700 -112.9400      14.8        28       144        60
OIR    2025250     91400   17.4700 -112.9500      14.8        29       143        60
OIR    2025250     91400   17.4700 -112.9600      14.7        29       143        60
OIR    2025250     91400   17.4700 -113.1000      13.9        28       144        60
OIR    2025250     91400   17.4700 -113.1100      13.9        27       143        60
OIR    2025250     91400   17.4700 -113.1200      13.9        27       143        60
OIR    2025250     91400   17.4700 -113.3000      13.9        24       144        60
OIR    2025250     91400   17.4700 -113.3100      13.9        24       144        60
OIR    2025250     91400   17.4700 -113.3300      13.9        24       144        60
OIR    2025250     91400   17.4700 -113.3400      13.8        24       143        60
OIR    2025250     91400   17.4700 -113.3500      13.8        24       142        60
OIR    2025250     91400   17.4700 -113.3600      13.8        24       142        60
OIR    2025250     91400   17.4700 -113.3700      13.8        24       141        60
OIR    2025250     91400   17.4700 -113.3800      13.8        24       143        60
OIR    2025250     91400   17.4700 -113.5800      13.4        16       144        60
OIR    2025250     91400   17.4700 -113.5900      13.4        15       142        60
OIR    2025250     91400   17.4700 -113.6000      13.3        14       140        60
OIR    2025250     91400   17.4700 -113.6100      13.2        12       137        60
OIR    2025250     91400   17.4700 -113.6200      13.2        12       133        60
OIR    2025250     91400   17.4700 -113.6300      13.2        10       134        60
OIR    2025250     91400   17.4700 -113.6400      13.3         9       135        60
OIR    2025250     91400   17.4700 -113.6500      13.4         8       137        60
OIR    2025250     91400   17.4700 -113.6600      13.4         8       138        60
OIR    2025250     91400   17.4700 -113.6700      13.4         8       140        60
OIR    2025250     91400   17.4700 -113.6800      13.4         8       144        60
OIR    2025250     91400   17.4700 -113.7500      13.4         8       141        60
OIR    2025250     91400   17.4700 -113.7600      13.4         8       138        60
OIR    2025250     91400   17.4700 -113.7700      13.4         8       142        60
OIR    2025250     91400   17.4600 -111.5000      15.3        47       143        60
OIR    2025250     91400   17.4600 -111.5100      15.4        46       140        60
OIR    2025250     91400   17.4600 -111.5200      15.4        46       136        60
OIR    2025250     91400   17.4600 -111.5300      15.4        46       132        60
OIR    2025250     91400   17.4600 -111.5400      15.4        46       128        60
OIR    2025250     91400   17.4600 -111.5500      15.4        46       126        60
OIR    2025250     91400   17.4600 -111.5600      15.5        46       134        60
OIR    2025250     91400   17.4600 -111.5700      15.5        46       142        60
OIR    2025250     91400   17.4600 -112.1600      15.7        44       144        60
OIR    2025250     91400   17.4600 -112.1700      16.0        43       138        60
OIR    2025250     91400   17.4600 -112.1800      16.1        43       138        60
OIR    2025250     91400   17.4600 -112.1900      16.2        43       141        60
OIR    2025250     91400   17.4600 -112.2000      16.2        42       144        60
OIR    2025250     91400   17.4600 -112.2400      17.0        40       143        60
OIR    2025250     91400   17.4600 -112.2500      17.2        40       141        60
OIR    2025250     91400   17.4600 -112.2600      17.3        39       140        60
OIR    2025250     91400   17.4600 -112.2700      17.3        39       139        60
OIR    2025250     91400   17.4600 -112.2800      17.3        39       138        60
OIR    2025250     91400   17.4600 -112.2900      17.3        38       137        60
OIR    2025250     91400   17.4600 -112.3000      17.3        38       137        60
OIR    2025250     91400   17.4600 -112.3100      17.3        37       138        60
OIR    2025250     91400   17.4600 -112.3200      17.3        36       137        60
OIR    2025250     91400   17.4600 -112.3300      17.2        35       136        60
OIR    2025250     91400   17.4600 -112.3400      17.1        33       135        60
OIR    2025250     91400   17.4600 -112.3500      17.1        32       134        60
OIR    2025250     91400   17.4600 -112.3600      17.1        31       134        60
OIR    2025250     91400   17.4600 -112.3700      17.1        30       135        60
OIR    2025250     91400   17.4600 -112.3800      17.2        29       135        60
OIR    2025250     91400   17.4600 -112.3900      17.2        29       136        60
OIR    2025250     91400   17.4600 -112.4000      17.2        28       138        60
OIR    2025250     91400   17.4600 -112.4100      17.3        27       139        60
OIR    2025250     91400   17.4600 -112.4200      17.3        27       139        60
OIR    2025250     91400   17.4600 -112.4300      17.3        26       139        60
OIR    2025250     91400   17.4600 -112.4400      17.3        26       137        60
OIR    2025250     91400   17.4600 -112.4500      17.3        26       136        60
OIR    2025250     91400   17.4600 -112.4600      17.3        26       137        60
OIR    2025250     91400   17.4600 -112.4700      17.3        25       139        60
OIR    2025250     91400   17.4600 -112.4800      17.2        25       140        60
OIR    2025250     91400   17.4600 -112.4900      17.1        25       141        60
OIR    2025250     91400   17.4600 -112.5000      17.1        25       141        60
OIR    2025250     91400   17.4600 -112.5100      17.0        25       140        60
OIR    2025250     91400   17.4600 -112.5200      17.0        25       139        60
OIR    2025250     91400   17.4600 -112.5300      17.0        25       138        60
OIR    2025250     91400   17.4600 -112.5400      16.9        25       138        60
OIR    2025250     91400   17.4600 -112.5500      16.9        25       138        60
OIR    2025250     91400   17.4600 -112.5600      16.8        25       139        60
OIR    2025250     91400   17.4600 -112.5700      16.8        25       140        60
OIR    2025250     91400   17.4600 -112.5800      16.7        25       141        60
OIR    2025250     91400   17.4600 -112.5900      16.7        25       142        60
OIR    2025250     91400   17.4600 -112.6000      16.6        25       142        60
OIR    2025250     91400   17.4600 -112.6100      16.5        25       141        60
OIR    2025250     91400   17.4600 -112.6200      16.4        25       140        60
OIR    2025250     91400   17.4600 -112.6300      16.3        25       139        60
OIR    2025250     91400   17.4600 -112.6400      16.2        25       139        60
OIR    2025250     91400   17.4600 -112.6500      16.0        25       142        60
OIR    2025250     91400   17.4600 -112.6600      15.8        25       145        60
OIR    2025250     91400   17.4600 -112.7000      15.1        25       143        60
OIR    2025250     91400   17.4600 -112.7100      15.0        25       140        60
OIR    2025250     91400   17.4600 -112.7200      14.9        25       137        60
OIR    2025250     91400   17.4600 -112.7300      14.9        25       134        60
OIR    2025250     91400   17.4600 -112.7400      14.9        25       135        60
OIR    2025250     91400   17.4600 -112.7500      14.9        25       135        60
OIR    2025250     91400   17.4600 -112.7600      14.8        25       137        60
OIR    2025250     91400   17.4600 -112.7700      14.8        25       139        60
OIR    2025250     91400   17.4600 -112.7800      14.7        25       141        60
OIR    2025250     91400   17.4600 -112.7900      14.7        25       142        60
OIR    2025250     91400   17.4600 -112.8000      14.6        25       142        60
OIR    2025250     91400   17.4600 -112.8700      14.6        26       143        60
OIR    2025250     91400   17.4600 -112.9300      14.8        28       143        60
OIR    2025250     91400   17.4600 -112.9400      14.9        29       142        60
OIR    2025250     91400   17.4600 -112.9500      14.8        29       141        60
OIR    2025250     91400   17.4600 -112.9600      14.8        29       141        60
OIR    2025250     91400   17.4600 -112.9700      14.8        29       143        60
OIR    2025250     91400   17.4600 -113.3300      13.9        24       144        60
OIR    2025250     91400   17.4600 -113.3400      13.9        24       143        60
OIR    2025250     91400   17.4600 -113.3500      13.9        24       143        60
OIR    2025250     91400   17.4600 -113.3600      13.9        24       142        60
OIR    2025250     91400   17.4600 -113.3700      13.9        24       142        60
OIR    2025250     91400   17.4600 -113.3800      13.9        24       143        60
OIR    2025250     91400   17.4600 -113.6000      13.6        13       142        60
OIR    2025250     91400   17.4600 -113.6100      13.4        12       138        60
OIR    2025250     91400   17.4600 -113.6200      13.4        11       134        60
OIR    2025250     91400   17.4600 -113.6300      13.4         9       134        60
OIR    2025250     91400   17.4600 -113.6400      13.4         8       135        60
OIR    2025250     91400   17.4600 -113.6500      13.4         8       137        60
OIR    2025250     91400   17.4600 -113.6600      13.4         8       139        60
OIR    2025250     91400   17.4600 -113.6700      13.4         8       141        60
OIR    2025250     91400   17.4600 -113.6800      13.4         8       144        60
OIR    2025250     91400   17.4600 -113.7600      13.4         8       143        60
OIR    2025250     91400   17.4600 -113.7700      13.4         8       142        60
OIR    2025250     91400   17.4600 -113.7800      13.4         8       143        60
OIR    2025250     91400   17.4600 -113.7900      13.4         8       144        60
OIR    2025250     91400   17.4500 -111.5100      15.3        46       143        60
OIR    2025250     91400   17.4500 -111.5200      15.4        46       139        60
OIR    2025250     91400   17.4500 -111.5300      15.4        46       135        60
OIR    2025250     91400   17.4500 -111.5400      15.4        46       130        60
OIR    2025250     91400   17.4500 -111.5500      15.4        46       126        60
OIR    2025250     91400   17.4500 -111.5600      15.4        46       134        60
OIR    2025250     91400   17.4500 -111.5700      15.5        46       143        60
OIR    2025250     91400   17.4500 -112.1700      16.0        43       143        60
OIR    2025250     91400   17.4500 -112.1800      16.1        43       141        60
OIR    2025250     91400   17.4500 -112.1900      16.2        42       143        60
OIR    2025250     91400   17.4500 -112.2400      17.2        40       144        60
OIR    2025250     91400   17.4500 -112.2500      17.3        40       142        60
OIR    2025250     91400   17.4500 -112.2600      17.4        39       141        60
OIR    2025250     91400   17.4500 -112.2700      17.4        39       139        60
OIR    2025250     91400   17.4500 -112.2800      17.4        39       137        60
OIR    2025250     91400   17.4500 -112.2900      17.4        39       136        60
OIR    2025250     91400   17.4500 -112.3000      17.4        38       136        60
OIR    2025250     91400   17.4500 -112.3100      17.4        38       137        60
OIR    2025250     91400   17.4500 -112.3200      17.4        37       138        60
OIR    2025250     91400   17.4500 -112.3300      17.3        35       137        60
OIR    2025250     91400   17.4500 -112.3400      17.2        34       137        60
OIR    2025250     91400   17.4500 -112.3500      17.2        33       136        60
OIR    2025250     91400   17.4500 -112.3600      17.2        32       136        60
OIR    2025250     91400   17.4500 -112.3700      17.2        31       135        60
OIR    2025250     91400   17.4500 -112.3800      17.2        30       135        60
OIR    2025250     91400   17.4500 -112.3900      17.2        29       135        60
OIR    2025250     91400   17.4500 -112.4000      17.3        28       137        60
OIR    2025250     91400   17.4500 -112.4100      17.3        28       139        60
OIR    2025250     91400   17.4500 -112.4200      17.4        27       139        60
OIR    2025250     91400   17.4500 -112.4300      17.4        27       139        60
OIR    2025250     91400   17.4500 -112.4400      17.4        26       138        60
OIR    2025250     91400   17.4500 -112.4500      17.4        26       137        60
OIR    2025250     91400   17.4500 -112.4600      17.4        26       137        60
OIR    2025250     91400   17.4500 -112.4700      17.4        26       139        60
OIR    2025250     91400   17.4500 -112.4800      17.3        25       141        60
OIR    2025250     91400   17.4500 -112.4900      17.2        25       141        60
OIR    2025250     91400   17.4500 -112.5000      17.2        25       140        60
OIR    2025250     91400   17.4500 -112.5100      17.1        25       140        60
OIR    2025250     91400   17.4500 -112.5200      17.0        25       140        60
OIR    2025250     91400   17.4500 -112.5300      17.0        25       139        60
OIR    2025250     91400   17.4500 -112.5400      17.0        25       136        60
OIR    2025250     91400   17.4500 -112.5500      16.9        25       135        60
OIR    2025250     91400   17.4500 -112.5600      16.9        25       137        60
OIR    2025250     91400   17.4500 -112.5700      16.8        25       140        60
OIR    2025250     91400   17.4500 -112.5800      16.8        25       141        60
OIR    2025250     91400   17.4500 -112.5900      16.7        25       143        60
OIR    2025250     91400   17.4500 -112.6000      16.6        25       143        60
OIR    2025250     91400   17.4500 -112.6100      16.5        25       141        60
OIR    2025250     91400   17.4500 -112.6200      16.4        25       140        60
OIR    2025250     91400   17.4500 -112.6300      16.3        25       139        60
OIR    2025250     91400   17.4500 -112.6400      16.2        26       138        60
OIR    2025250     91400   17.4500 -112.6500      16.0        26       141        60
OIR    2025250     91400   17.4500 -112.6600      15.9        25       145        60
OIR    2025250     91400   17.4500 -112.6900      15.2        25       145        60
OIR    2025250     91400   17.4500 -112.7000      15.1        25       142        60
OIR    2025250     91400   17.4500 -112.7100      15.0        25       138        60
OIR    2025250     91400   17.4500 -112.7200      15.0        25       136        60
OIR    2025250     91400   17.4500 -112.7300      15.0        25       134        60
OIR    2025250     91400   17.4500 -112.7400      14.9        25       134        60
OIR    2025250     91400   17.4500 -112.7500      14.9        25       134        60
OIR    2025250     91400   17.4500 -112.7600      14.9        26       135        60
OIR    2025250     91400   17.4500 -112.7700      14.9        26       137        60
OIR    2025250     91400   17.4500 -112.7800      14.8        26       139        60
OIR    2025250     91400   17.4500 -112.7900      14.7        26       142        60
OIR    2025250     91400   17.4500 -112.8600      14.7        26       144        60
OIR    2025250     91400   17.4500 -112.8700      14.7        27       142        60
OIR    2025250     91400   17.4500 -112.8800      14.8        27       143        60
OIR    2025250     91400   17.4500 -112.9400      14.9        29       143        60
OIR    2025250     91400   17.4500 -112.9500      14.9        29       142        60
OIR    2025250     91400   17.4500 -112.9600      14.9        29       140        60
OIR    2025250     91400   17.4500 -112.9700      14.9        29       142        60
OIR    2025250     91400   17.4500 -113.3300      14.0        25       144        60
OIR    2025250     91400   17.4500 -113.3400      13.9        25       144        60
OIR    2025250     91400   17.4500 -113.3500      13.9        24       143        60
OIR    2025250     91400   17.4500 -113.3600      13.9        24       143        60
OIR    2025250     91400   17.4500 -113.3700      13.9        24       143        60
OIR    2025250     91400   17.4500 -113.3800      13.9        24       144        60
OIR    2025250     91400   17.4500 -113.5500      13.4        17       142        60
OIR    2025250     91400   17.4500 -113.5600      13.5        16       142        60
OIR    2025250     91400   17.4500 -113.6000      13.9        11       144        60
OIR    2025250     91400   17.4500 -113.6100      13.8        11       143        60
OIR    2025250     91400   17.4500 -113.6200      13.6        10       141        60
OIR    2025250     91400   17.4500 -113.6300      13.5         9       141        60
OIR    2025250     91400   17.4500 -113.6400      13.5         8       141        60
OIR    2025250     91400   17.4500 -113.6500      13.4         8       141        60
OIR    2025250     91400   17.4500 -113.6600      13.4         8       144        60
OIR    2025250     91400   17.4500 -113.7800      13.4         8       143        60
OIR    2025250     91400   17.4500 -113.7900      13.3         8       143        60
OIR    2025250     91400   17.4500 -113.8000      13.3         8       142        60
OIR    2025250     91400   17.4500 -113.8100      13.3         7       143        60
OIR    2025250     91400   17.4400 -111.5200      15.3        46       142        60
OIR    2025250     91400   17.4400 -111.5300      15.4        46       138        60
OIR    2025250     91400   17.4400 -111.5400      15.4        46       133        60
OIR    2025250     91400   17.4400 -111.5500      15.4        46       129        60
OIR    2025250     91400   17.4400 -111.5600      15.4        46       134        60
OIR    2025250     91400   17.4400 -111.5700      15.5        46       143        60
OIR    2025250     91400   17.4400 -112.1800      16.2        43       144        60
OIR    2025250     91400   17.4400 -112.2500      17.4        40       145        60
OIR    2025250     91400   17.4400 -112.2600      17.4        39       142        60
OIR    2025250     91400   17.4400 -112.2700      17.5        39       139        60
OIR    2025250     91400   17.4400 -112.2800      17.5        39       137        60
OIR    2025250     91400   17.4400 -112.2900      17.5        39       134        60
OIR    2025250     91400   17.4400 -112.3000      17.5        38       134        60
OIR    2025250     91400   17.4400 -112.3100      17.5        38       136        60
OIR    2025250     91400   17.4400 -112.3200      17.5        37       138        60
OIR    2025250     91400   17.4400 -112.3300      17.4        36       139        60
OIR    2025250     91400   17.4400 -112.3400      17.4        35       140        60
OIR    2025250     91400   17.4400 -112.3500      17.3        34       140        60
OIR    2025250     91400   17.4400 -112.3600      17.3        32       139        60
OIR    2025250     91400   17.4400 -112.3700      17.3        31       138        60
OIR    2025250     91400   17.4400 -112.3800      17.3        31       136        60
OIR    2025250     91400   17.4400 -112.3900      17.3        30       135        60
OIR    2025250     91400   17.4400 -112.4000      17.4        29       136        60
OIR    2025250     91400   17.4400 -112.4100      17.4        28       138        60
OIR    2025250     91400   17.4400 -112.4200      17.5        28       138        60
OIR    2025250     91400   17.4400 -112.4300      17.5        27       137        60
OIR    2025250     91400   17.4400 -112.4400      17.5        26       137        60
OIR    2025250     91400   17.4400 -112.4500      17.5        26       138        60
OIR    2025250     91400   17.4400 -112.4600      17.5        26       139        60
OIR    2025250     91400   17.4400 -112.4700      17.4        26       140        60
OIR    2025250     91400   17.4400 -112.4800      17.4        26       141        60
OIR    2025250     91400   17.4400 -112.4900      17.3        26       139        60
OIR    2025250     91400   17.4400 -112.5000      17.2        26       136        60
OIR    2025250     91400   17.4400 -112.5100      17.2        26       136        60
OIR    2025250     91400   17.4400 -112.5200      17.1        26       138        60
OIR    2025250     91400   17.4400 -112.5300      17.0        26       139        60
OIR    2025250     91400   17.4400 -112.5400      17.0        26       137        60
OIR    2025250     91400   17.4400 -112.5500      17.0        26       135        60
OIR    2025250     91400   17.4400 -112.5600      16.9        26       136        60
OIR    2025250     91400   17.4400 -112.5700      16.9        26       138        60
OIR    2025250     91400   17.4400 -112.5800      16.8        26       140        60
OIR    2025250     91400   17.4400 -112.5900      16.7        26       142        60
OIR    2025250     91400   17.4400 -112.6000      16.6        26       142        60
OIR    2025250     91400   17.4400 -112.6100      16.5        26       141        60
OIR    2025250     91400   17.4400 -112.6200      16.4        26       139        60
OIR    2025250     91400   17.4400 -112.6300      16.3        26       138        60
OIR    2025250     91400   17.4400 -112.6400      16.2        26       138        60
OIR    2025250     91400   17.4400 -112.6500      16.0        26       140        60
OIR    2025250     91400   17.4400 -112.6600      15.9        26       143        60
OIR    2025250     91400   17.4400 -112.6700      15.6        25       145        60
OIR    2025250     91400   17.4400 -112.6800      15.3        25       145        60
OIR    2025250     91400   17.4400 -112.6900      15.2        25       144        60
OIR    2025250     91400   17.4400 -112.7000      15.1        25       141        60
OIR    2025250     91400   17.4400 -112.7100      15.1        26       137        60
OIR    2025250     91400   17.4400 -112.7200      15.0        25       136        60
OIR    2025250     91400   17.4400 -112.7300      15.0        25       136        60
OIR    2025250     91400   17.4400 -112.7400      15.0        26       136        60
OIR    2025250     91400   17.4400 -112.7500      15.0        26       136        60
OIR    2025250     91400   17.4400 -112.7600      15.0        26       136        60
OIR    2025250     91400   17.4400 -112.7700      15.0        26       137        60
OIR    2025250     91400   17.4400 -112.7800      14.9        27       139        60
OIR    2025250     91400   17.4400 -112.7900      14.9        27       142        60
OIR    2025250     91400   17.4400 -112.8600      14.8        27       143        60
OIR    2025250     91400   17.4400 -112.8700      14.9        27       142        60
OIR    2025250     91400   17.4400 -112.8800      14.9        28       142        60
OIR    2025250     91400   17.4400 -112.8900      15.0        28       143        60
OIR    2025250     91400   17.4400 -112.9000      15.0        28       143        60
OIR    2025250     91400   17.4400 -112.9500      15.0        30       143        60
OIR    2025250     91400   17.4400 -112.9600      14.9        30       141        60
OIR    2025250     91400   17.4400 -112.9700      14.9        30       142        60
OIR    2025250     91400   17.4400 -112.9800      14.9        30       144        60
OIR    2025250     91400   17.4400 -113.5500      14.0        15       141        60
OIR    2025250     91400   17.4400 -113.5600      14.0        13       137        60
OIR    2025250     91400   17.4400 -113.5700      13.9        12       142        60
OIR    2025250     91400   17.4400 -113.7900      13.3         8       144        60
OIR    2025250     91400   17.4400 -113.8000      13.3         8       141        60
OIR    2025250     91400   17.4400 -113.8100      13.3         8       138        60
OIR    2025250     91400   17.4400 -113.8200      13.2         8       142        60
OIR    2025250     91400   17.4300 -111.5300      15.4        46       141        60
OIR    2025250     91400   17.4300 -111.5400      15.4        46       139        60
OIR    2025250     91400   17.4300 -111.5500      15.4        46       137        60
OIR    2025250     91400   17.4300 -111.5600      15.4        46       139        60
OIR    2025250     91400   17.4300 -112.1800      16.2        43       144        60
OIR    2025250     91400   17.4300 -112.1900      16.3        42       144        60
OIR    2025250     91400   17.4300 -112.2400      17.3        40       144        60
OIR    2025250     91400   17.4300 -112.2500      17.4        40       142        60
OIR    2025250     91400   17.4300 -112.2600      17.5        39       140        60
OIR    2025250     91400   17.4300 -112.2700      17.5        39       137        60
OIR    2025250     91400   17.4300 -112.2800      17.6        39       134        60
OIR    2025250     91400   17.4300 -112.2900      17.6        39       132        60
OIR    2025250     91400   17.4300 -112.3000      17.6        39       131        60
OIR    2025250     91400   17.4300 -112.3100      17.6        38       134        60
OIR    2025250     91400   17.4300 -112.3200      17.6        38       136        60
OIR    2025250     91400   17.4300 -112.3300      17.5        37       138        60
OIR    2025250     91400   17.4300 -112.3400      17.5        36       140        60
OIR    2025250     91400   17.4300 -112.3500      17.5        34       141        60
OIR    2025250     91400   17.4300 -112.3600      17.4        33       141        60
OIR    2025250     91400   17.4300 -112.3700      17.4        32       140        60
OIR    2025250     91400   17.4300 -112.3800      17.4        31       137        60
OIR    2025250     91400   17.4300 -112.3900      17.4        30       134        60
OIR    2025250     91400   17.4300 -112.4000      17.5        29       136        60
OIR    2025250     91400   17.4300 -112.4100      17.5        29       138        60
OIR    2025250     91400   17.4300 -112.4200      17.6        28       138        60
OIR    2025250     91400   17.4300 -112.4300      17.6        27       136        60
OIR    2025250     91400   17.4300 -112.4400      17.6        27       135        60
OIR    2025250     91400   17.4300 -112.4500      17.6        27       137        60
OIR    2025250     91400   17.4300 -112.4600      17.6        26       139        60
OIR    2025250     91400   17.4300 -112.4700      17.5        26       139        60
OIR    2025250     91400   17.4300 -112.4800      17.4        26       139        60
OIR    2025250     91400   17.4300 -112.4900      17.3        26       137        60
OIR    2025250     91400   17.4300 -112.5000      17.3        26       134        60
OIR    2025250     91400   17.4300 -112.5100      17.2        26       134        60
OIR    2025250     91400   17.4300 -112.5200      17.1        26       136        60
OIR    2025250     91400   17.4300 -112.5300      17.1        26       139        60
OIR    2025250     91400   17.4300 -112.5400      17.1        26       138        60
OIR    2025250     91400   17.4300 -112.5500      17.0        26       136        60
OIR    2025250     91400   17.4300 -112.5600      17.0        26       136        60
OIR    2025250     91400   17.4300 -112.5700      16.9        26       136        60
OIR    2025250     91400   17.4300 -112.5800      16.8        26       138        60
OIR    2025250     91400   17.4300 -112.5900      16.8        26       140        60
OIR    2025250     91400   17.4300 -112.6000      16.7        26       142        60
OIR    2025250     91400   17.4300 -112.6100      16.5        26       140        60
OIR    2025250     91400   17.4300 -112.6200      16.4        26       138        60
OIR    2025250     91400   17.4300 -112.6300      16.3        26       137        60
OIR    2025250     91400   17.4300 -112.6400      16.2        26       137        60
OIR    2025250     91400   17.4300 -112.6500      16.0        26       139        60
OIR    2025250     91400   17.4300 -112.6600      15.9        26       141        60
OIR    2025250     91400   17.4300 -112.6700      15.7        26       144        60
OIR    2025250     91400   17.4300 -112.6800      15.5        26       143        60
OIR    2025250     91400   17.4300 -112.6900      15.3        26       143        60
OIR    2025250     91400   17.4300 -112.7000      15.2        26       140        60
OIR    2025250     91400   17.4300 -112.7100      15.2        26       136        60
OIR    2025250     91400   17.4300 -112.7200      15.1        26       136        60
OIR    2025250     91400   17.4300 -112.7300      15.1        26       138        60
OIR    2025250     91400   17.4300 -112.7400      15.1        26       139        60
OIR    2025250     91400   17.4300 -112.7500      15.1        26       139        60
OIR    2025250     91400   17.4300 -112.7600      15.1        27       139        60
OIR    2025250     91400   17.4300 -112.7700      15.1        27       141        60
OIR    2025250     91400   17.4300 -112.7800      15.2        28       142        60
OIR    2025250     91400   17.4300 -112.7900      15.2        28       144        60
OIR    2025250     91400   17.4300 -112.8600      15.0        28       144        60
OIR    2025250     91400   17.4300 -112.8700      15.1        28       142        60
OIR    2025250     91400   17.4300 -112.8800      15.1        28       142        60
OIR    2025250     91400   17.4300 -112.8900      15.1        29       143        60
OIR    2025250     91400   17.4300 -112.9000      15.1        29       143        60
OIR    2025250     91400   17.4300 -112.9100      15.1        29       142        60
OIR    2025250     91400   17.4300 -112.9200      15.1        29       142        60
OIR    2025250     91400   17.4300 -112.9300      15.1        30       142        60
OIR    2025250     91400   17.4300 -112.9400      15.0        30       142        60
OIR    2025250     91400   17.4300 -112.9500      15.0        30       141        60
OIR    2025250     91400   17.4300 -112.9600      15.0        30       140        60
OIR    2025250     91400   17.4300 -112.9700      15.0        30       140        60
OIR    2025250     91400   17.4300 -112.9800      14.9        30       141        60
OIR    2025250     91400   17.4300 -112.9900      14.9        30       142        60
OIR    2025250     91400   17.4300 -113.5300      13.8        18       143        60
OIR    2025250     91400   17.4300 -113.5400      13.9        15       140        60
OIR    2025250     91400   17.4300 -113.5500      13.9        13       138        60
OIR    2025250     91400   17.4300 -113.5600      14.0        12       136        60
OIR    2025250     91400   17.4300 -113.5700      14.0        11       140        60
OIR    2025250     91400   17.4300 -113.8000      13.3         8       142        60
OIR    2025250     91400   17.4300 -113.8100      13.3         8       138        60
OIR    2025250     91400   17.4300 -113.8200      13.2         8       141        60
OIR    2025250     91400   17.4200 -111.5300      15.4        46       144        60
OIR    2025250     91400   17.4200 -111.5400      15.4        46       144        60
OIR    2025250     91400   17.4200 -112.1900      16.4        42       144        60
OIR    2025250     91400   17.4200 -112.2300      17.2        40       144        60
OIR    2025250     91400   17.4200 -112.2400      17.4        40       142        60
OIR    2025250     91400   17.4200 -112.2500      17.5        40       140        60
OIR    2025250     91400   17.4200 -112.2600      17.5        40       137        60
OIR    2025250     91400   17.4200 -112.2700      17.6        39       134        60
OIR    2025250     91400   17.4200 -112.2800      17.6        39       132        60
OIR    2025250     91400   17.4200 -112.2900      17.7        39       130        60
OIR    2025250     91400   17.4200 -112.3000      17.7        39       129        60
OIR    2025250     91400   17.4200 -112.3100      17.7        38       132        60
OIR    2025250     91400   17.4200 -112.3200      17.7        38       134        60
OIR    2025250     91400   17.4200 -112.3300      17.7        37       137        60
OIR    2025250     91400   17.4200 -112.3400      17.6        36       139        60
OIR    2025250     91400   17.4200 -112.3500      17.6        35       141        60
OIR    2025250     91400   17.4200 -112.3600      17.6        34       141        60
OIR    2025250     91400   17.4200 -112.3700      17.5        33       141        60
OIR    2025250     91400   17.4200 -112.3800      17.5        32       138        60
OIR    2025250     91400   17.4200 -112.3900      17.5        31       135        60
OIR    2025250     91400   17.4200 -112.4000      17.6        30       135        60
OIR    2025250     91400   17.4200 -112.4100      17.6        29       137        60
OIR    2025250     91400   17.4200 -112.4200      17.7        29       138        60
OIR    2025250     91400   17.4200 -112.4300      17.7        28       137        60
OIR    2025250     91400   17.4200 -112.4400      17.7        27       137        60
OIR    2025250     91400   17.4200 -112.4500      17.7        27       136        60
OIR    2025250     91400   17.4200 -112.4600      17.7        27       135        60
OIR    2025250     91400   17.4200 -112.4700      17.6        26       135        60
OIR    2025250     91400   17.4200 -112.4800      17.5        26       135        60
OIR    2025250     91400   17.4200 -112.4900      17.4        26       135        60
OIR    2025250     91400   17.4200 -112.5000      17.3        26       135        60
OIR    2025250     91400   17.4200 -112.5100      17.3        26       135        60
OIR    2025250     91400   17.4200 -112.5200      17.2        26       137        60
OIR    2025250     91400   17.4200 -112.5300      17.2        26       139        60
OIR    2025250     91400   17.4200 -112.5400      17.1        26       138        60
OIR    2025250     91400   17.4200 -112.5500      17.0        26       137        60
OIR    2025250     91400   17.4200 -112.5600      17.0        26       137        60
OIR    2025250     91400   17.4200 -112.5700      16.9        26       137        60
OIR    2025250     91400   17.4200 -112.5800      16.9        26       138        60
OIR    2025250     91400   17.4200 -112.5900      16.8        26       139        60
OIR    2025250     91400   17.4200 -112.6000      16.7        26       141        60
OIR    2025250     91400   17.4200 -112.6100      16.6        27       141        60
OIR    2025250     91400   17.4200 -112.6200      16.4        27       141        60
OIR    2025250     91400   17.4200 -112.6300      16.3        27       140        60
OIR    2025250     91400   17.4200 -112.6400      16.1        27       139        60
OIR    2025250     91400   17.4200 -112.6500      16.0        27       139        60
OIR    2025250     91400   17.4200 -112.6600      16.0        27       142        60
OIR    2025250     91400   17.4200 -112.6700      15.8        27       144        60
OIR    2025250     91400   17.4200 -112.6800      15.6        27       143        60
OIR    2025250     91400   17.4200 -112.6900      15.4        26       142        60
OIR    2025250     91400   17.4200 -112.7000      15.3        26       139        60
OIR    2025250     91400   17.4200 -112.7100      15.3        26       136        60
OIR    2025250     91400   17.4200 -112.7200      15.2        26       137        60
OIR    2025250     91400   17.4200 -112.7300      15.2        26       139        60
OIR    2025250     91400   17.4200 -112.7400      15.2        27       141        60
OIR    2025250     91400   17.4200 -112.7500      15.2        27       141        60
OIR    2025250     91400   17.4200 -112.7600      15.3        28       140        60
OIR    2025250     91400   17.4200 -112.7700      15.3        28       141        60
OIR    2025250     91400   17.4200 -112.7800      15.3        29       142        60
OIR    2025250     91400   17.4200 -112.7900      15.3        29       143        60
OIR    2025250     91400   17.4200 -112.8700      15.2        29       143        60
OIR    2025250     91400   17.4200 -112.8800      15.2        29       142        60
OIR    2025250     91400   17.4200 -112.8900      15.2        29       143        60
OIR    2025250     91400   17.4200 -112.9100      15.2        30       141        60
OIR    2025250     91400   17.4200 -112.9200      15.2        30       138        60
OIR    2025250     91400   17.4200 -112.9300      15.1        30       138        60
OIR    2025250     91400   17.4200 -112.9400      15.1        30       138        60
OIR    2025250     91400   17.4200 -112.9500      15.1        30       138        60
OIR    2025250     91400   17.4200 -112.9600      15.0        30       138        60
OIR    2025250     91400   17.4200 -112.9700      15.0        30       138        60
OIR    2025250     91400   17.4200 -112.9800      15.0        30       139        60
OIR    2025250     91400   17.4200 -112.9900      14.9        30       139        60
OIR    2025250     91400   17.4200 -113.0000      14.9        30       142        60
OIR    2025250     91400   17.4200 -113.0300      14.8        30       144        60
OIR    2025250     91400   17.4200 -113.0400      14.8        30       143        60
OIR    2025250     91400   17.4200 -113.5200      14.2        21       143        60
OIR    2025250     91400   17.4200 -113.5300      13.8        15       138        60
OIR    2025250     91400   17.4200 -113.5400      13.8        14       135        60
OIR    2025250     91400   17.4200 -113.5500      13.9        13       135        60
OIR    2025250     91400   17.4200 -113.5600      14.0        11       135        60
OIR    2025250     91400   17.4200 -113.5700      14.0        10       138        60
OIR    2025250     91400   17.4200 -113.5800      13.9        10       142        60
OIR    2025250     91400   17.4200 -113.8100      13.3         8       140        60
OIR    2025250     91400   17.4200 -113.8200      13.3         8       143        60
OIR    2025250     91400   17.4100 -111.5300      15.4        46       142        60
OIR    2025250     91400   17.4100 -111.5400      15.4        46       142        60
OIR    2025250     91400   17.4100 -111.8200      15.4        48       144        60
OIR    2025250     91400   17.4100 -112.1900      16.5        42       144        60
OIR    2025250     91400   17.4100 -112.2000      16.6        42       143        60
OIR    2025250     91400   17.4100 -112.2100      16.7        42       143        60
OIR    2025250     91400   17.4100 -112.2200      17.0        41       142        60
OIR    2025250     91400   17.4100 -112.2300      17.3        40       142        60
OIR    2025250     91400   17.4100 -112.2400      17.4        40       141        60
OIR    2025250     91400   17.4100 -112.2500      17.5        40       139        60
OIR    2025250     91400   17.4100 -112.2600      17.6        39       137        60
OIR    2025250     91400   17.4100 -112.2700      17.6        39       134        60
OIR    2025250     91400   17.4100 -112.2800      17.7        39       131        60
OIR    2025250     91400   17.4100 -112.2900      17.7        39       131        60
OIR    2025250     91400   17.4100 -112.3000      17.7        39       131        60
OIR    2025250     91400   17.4100 -112.3100      17.8        38       133        60
OIR    2025250     91400   17.4100 -112.3200      17.8        38       135        60
OIR    2025250     91400   17.4100 -112.3300      17.8        37       137        60
OIR    2025250     91400   17.4100 -112.3400      17.8        37       139        60
OIR    2025250     91400   17.4100 -112.3500      17.8        36       141        60
OIR    2025250     91400   17.4100 -112.3600      17.8        35       141        60
OIR    2025250     91400   17.4100 -112.3700      17.7        34       141        60
OIR    2025250     91400   17.4100 -112.3800      17.7        33       139        60
OIR    2025250     91400   17.4100 -112.3900      17.7        32       136        60
OIR    2025250     91400   17.4100 -112.4000      17.7        31       135        60
OIR    2025250     91400   17.4100 -112.4100      17.7        30       136        60
OIR    2025250     91400   17.4100 -112.4200      17.8        29       138        60
OIR    2025250     91400   17.4100 -112.4300      17.8        28       138        60
OIR    2025250     91400   17.4100 -112.4400      17.8        28       138        60
OIR    2025250     91400   17.4100 -112.4500      17.8        27       136        60
OIR    2025250     91400   17.4100 -112.4600      17.8        27       133        60
OIR    2025250     91400   17.4100 -112.4700      17.7        27       132        60
OIR    2025250     91400   17.4100 -112.4800      17.6        27       132        60
OIR    2025250     91400   17.4100 -112.4900      17.5        26       133        60
OIR    2025250     91400   17.4100 -112.5000      17.4        26       135        60
OIR    2025250     91400   17.4100 -112.5100      17.3        26       137        60
OIR    2025250     91400   17.4100 -112.5200      17.3        26       137        60
OIR    2025250     91400   17.4100 -112.5300      17.2        26       138        60
OIR    2025250     91400   17.4100 -112.5400      17.2        26       138        60
OIR    2025250     91400   17.4100 -112.5500      17.1        26       138        60
OIR    2025250     91400   17.4100 -112.5600      17.0        26       137        60
OIR    2025250     91400   17.4100 -112.5700      17.0        26       138        60
OIR    2025250     91400   17.4100 -112.5800      16.9        27       139        60
OIR    2025250     91400   17.4100 -112.5900      16.8        27       139        60
OIR    2025250     91400   17.4100 -112.6000      16.7        27       139        60
OIR    2025250     91400   17.4100 -112.6100      16.6        27       141        60
OIR    2025250     91400   17.4100 -112.6200      16.4        27       144        60
OIR    2025250     91400   17.4100 -112.6300      16.3        27       144        60
OIR    2025250     91400   17.4100 -112.6400      16.2        27       142        60
OIR    2025250     91400   17.4100 -112.6500      16.1        27       140        60
OIR    2025250     91400   17.4100 -112.6600      16.0        27       142        60
OIR    2025250     91400   17.4100 -112.6700      15.9        27       145        60
OIR    2025250     91400   17.4100 -112.6800      15.8        27       144        60
OIR    2025250     91400   17.4100 -112.6900      15.6        27       141        60
OIR    2025250     91400   17.4100 -112.7000      15.5        27       139        60
OIR    2025250     91400   17.4100 -112.7100      15.4        27       137        60
OIR    2025250     91400   17.4100 -112.7200      15.4        27       137        60
OIR    2025250     91400   17.4100 -112.7300      15.3        27       140        60
OIR    2025250     91400   17.4100 -112.7400      15.4        28       142        60
OIR    2025250     91400   17.4100 -112.7500      15.4        28       140        60
OIR    2025250     91400   17.4100 -112.7600      15.5        29       139        60
OIR    2025250     91400   17.4100 -112.7700      15.5        29       138        60
OIR    2025250     91400   17.4100 -112.7800      15.5        29       140        60
OIR    2025250     91400   17.4100 -112.7900      15.4        29       141        60
OIR    2025250     91400   17.4100 -112.8000      15.4        29       141        60
OIR    2025250     91400   17.4100 -112.8100      15.4        29       142        60
OIR    2025250     91400   17.4100 -112.8200      15.4        29       143        60
OIR    2025250     91400   17.4100 -112.8900      15.3        30       144        60
OIR    2025250     91400   17.4100 -112.9000      15.3        30       143        60
OIR    2025250     91400   17.4100 -112.9100      15.3        30       141        60
OIR    2025250     91400   17.4100 -112.9200      15.2        30       139        60
OIR    2025250     91400   17.4100 -112.9300      15.2        30       139        60
OIR    2025250     91400   17.4100 -112.9400      15.2        30       141        60
OIR    2025250     91400   17.4100 -112.9500      15.1        30       141        60
OIR    2025250     91400   17.4100 -112.9600      15.1        30       141        60
OIR    2025250     91400   17.4100 -112.9700      15.1        30       142        60
OIR    2025250     91400   17.4100 -112.9800      15.0        30       142        60
OIR    2025250     91400   17.4100 -112.9900      15.0        30       142        60
OIR    2025250     91400   17.4100 -113.0000      15.0        30       143        60
OIR    2025250     91400   17.4100 -113.3100      14.1        25       144        60
OIR    2025250     91400   17.4100 -113.5100      14.5        22       144        60
OIR    2025250     91400   17.4100 -113.5200      14.6        20       138        60
OIR    2025250     91400   17.4100 -113.5300      14.2        17       133        60
OIR    2025250     91400   17.4100 -113.5400      13.9        14       128        60
OIR    2025250     91400   17.4100 -113.5500      14.0        13       130        60
OIR    2025250     91400   17.4100 -113.5600      14.1        11       132        60
OIR    2025250     91400   17.4100 -113.5700      14.0        10       136        60
OIR    2025250     91400   17.4100 -113.5800      13.9        10       141        60
OIR    2025250     91400   17.4000 -111.5300      15.4        46       141        60
OIR    2025250     91400   17.4000 -111.5400      15.4        46       139        60
OIR    2025250     91400   17.4000 -111.5500      15.4        46       144        60
OIR    2025250     91400   17.4000 -111.7400      16.0        47       143        60
OIR    2025250     91400   17.4000 -111.7500      16.0        47       138        60
OIR    2025250     91400   17.4000 -111.7600      16.0        47       143        60
OIR    2025250     91400   17.4000 -112.2000      16.7        42       143        60
OIR    2025250     91400   17.4000 -112.2100      16.8        42       140        60
OIR    2025250     91400   17.4000 -112.2200      17.1        41       140        60
OIR    2025250     91400   17.4000 -112.2300      17.4        40       140        60
OIR    2025250     91400   17.4000 -112.2400      17.5        40       139        60
OIR    2025250     91400   17.4000 -112.2500      17.5        40       137        60
OIR    2025250     91400   17.4000 -112.2600      17.6        39       136        60
OIR    2025250     91400   17.4000 -112.2700      17.7        39       133        60
OIR    2025250     91400   17.4000 -112.2800      17.7        39       131        60
OIR    2025250     91400   17.4000 -112.2900      17.8        39       132        60
OIR    2025250     91400   17.4000 -112.3000      17.8        39       134        60
OIR    2025250     91400   17.4000 -112.3100      17.9        39       135        60
OIR    2025250     91400   17.4000 -112.3200      17.9        38       136        60
OIR    2025250     91400   17.4000 -112.3300      18.0        38       138        60
OIR    2025250     91400   17.4000 -112.3400      18.0        37       139        60
OIR    2025250     91400   17.4000 -112.3500      18.0        37       141        60
OIR    2025250     91400   17.4000 -112.3600      18.0        36       141        60
OIR    2025250     91400   17.4000 -112.3700      17.9        35       141        60
OIR    2025250     91400   17.4000 -112.3800      17.9        34       140        60
OIR    2025250     91400   17.4000 -112.3900      17.8        32       137        60
OIR    2025250     91400   17.4000 -112.4000      17.9        31       135        60
OIR    2025250     91400   17.4000 -112.4100      17.9        30       137        60
OIR    2025250     91400   17.4000 -112.4200      17.9        30       138        60
OIR    2025250     91400   17.4000 -112.4300      17.9        29       138        60
OIR    2025250     91400   17.4000 -112.4400      17.9        28       137        60
OIR    2025250     91400   17.4000 -112.4500      17.9        28       136        60
OIR    2025250     91400   17.4000 -112.4600      17.9        27       134        60
OIR    2025250     91400   17.4000 -112.4700      17.8        27       133        60
OIR    2025250     91400   17.4000 -112.4800      17.7        27       133        60
OIR    2025250     91400   17.4000 -112.4900      17.6        27       132        60
OIR    2025250     91400   17.4000 -112.5000      17.5        27       133        60
OIR    2025250     91400   17.4000 -112.5100      17.4        26       135        60
OIR    2025250     91400   17.4000 -112.5200      17.3        26       135        60
OIR    2025250     91400   17.4000 -112.5300      17.3        26       136        60
OIR    2025250     91400   17.4000 -112.5400      17.2        27       137        60
OIR    2025250     91400   17.4000 -112.5500      17.1        27       138        60
OIR    2025250     91400   17.4000 -112.5600      17.0        27       140        60
OIR    2025250     91400   17.4000 -112.5700      17.0        27       141        60
OIR    2025250     91400   17.4000 -112.5800      16.9        27       143        60
OIR    2025250     91400   17.4000 -112.5900      16.8        27       142        60
OIR    2025250     91400   17.4000 -112.6000      16.7        27       141        60
OIR    2025250     91400   17.4000 -112.6100      16.6        27       142        60
OIR    2025250     91400   17.4000 -112.6400      16.2        28       144        60
OIR    2025250     91400   17.4000 -112.6500      16.2        28       141        60
OIR    2025250     91400   17.4000 -112.6600      16.1        28       143        60
OIR    2025250     91400   17.4000 -112.6700      16.0        28       145        60
OIR    2025250     91400   17.4000 -112.6800      15.9        28       145        60
OIR    2025250     91400   17.4000 -112.6900      15.8        28       142        60
OIR    2025250     91400   17.4000 -112.7000      15.7        28       140        60
OIR    2025250     91400   17.4000 -112.7100      15.6        28       139        60
OIR    2025250     91400   17.4000 -112.7200      15.6        28       138        60
OIR    2025250     91400   17.4000 -112.7300      15.5        28       140        60
OIR    2025250     91400   17.4000 -112.7400      15.5        29       141        60
OIR    2025250     91400   17.4000 -112.7500      15.6        29       141        60
OIR    2025250     91400   17.4000 -112.7600      15.6        29       139        60
OIR    2025250     91400   17.4000 -112.7700      15.5        30       139        60
OIR    2025250     91400   17.4000 -112.7800      15.5        30       140        60
OIR    2025250     91400   17.4000 -112.7900      15.5        30       141        60
OIR    2025250     91400   17.4000 -112.8000      15.5        30       140        60
OIR    2025250     91400   17.4000 -112.8100      15.5        30       139        60
OIR    2025250     91400   17.4000 -112.8200      15.5        30       140        60
OIR    2025250     91400   17.4000 -112.8300      15.4        30       141        60
OIR    2025250     91400   17.4000 -112.8400      15.4        29       143        60
OIR    2025250     91400   17.4000 -112.9000      15.3        30       142        60
OIR    2025250     91400   17.4000 -112.9100      15.3        30       141        60
OIR    2025250     91400   17.4000 -112.9200      15.3        30       140        60
OIR    2025250     91400   17.4000 -112.9300      15.3        30       140        60
OIR    2025250     91400   17.4000 -112.9400      15.2        30       142        60
OIR    2025250     91400   17.4000 -113.3400      14.3        26       144        60
OIR    2025250     91400   17.4000 -113.5100      15.5        22       143        60
OIR    2025250     91400   17.4000 -113.5200      15.0        20       136        60
OIR    2025250     91400   17.4000 -113.5300      14.8        16       131        60
OIR    2025250     91400   17.4000 -113.5400      14.6        12       126        60
OIR    2025250     91400   17.4000 -113.5500      14.4        12       127        60
OIR    2025250     91400   17.4000 -113.5600      14.3        11       130        60
OIR    2025250     91400   17.4000 -113.5700      14.0        10       135        60
OIR    2025250     91400   17.4000 -113.5800      13.9        10       140        60
OIR    2025250     91400   17.4000 -113.5900      13.9         9       144        60
OIR    2025250     91400   17.3900 -111.7400      16.0        47       142        60
OIR    2025250     91400   17.3900 -111.7500      16.1        47       136        60
OIR    2025250     91400   17.3900 -111.7600      16.1        47       140        60
OIR    2025250     91400   17.3900 -111.8300      15.6        47       145        60
OIR    2025250     91400   17.3900 -111.8400      15.0        47       144        60
OIR    2025250     91400   17.3900 -111.8500      15.0        48       144        60
OIR    2025250     91400   17.3900 -112.2100      16.8        42       144        60
OIR    2025250     91400   17.3900 -112.2200      17.1        41       142        60
OIR    2025250     91400   17.3900 -112.2300      17.4        40       138        60
OIR    2025250     91400   17.3900 -112.2400      17.5        40       135        60
OIR    2025250     91400   17.3900 -112.2500      17.6        40       135        60
OIR    2025250     91400   17.3900 -112.2600      17.7        40       134        60
OIR    2025250     91400   17.3900 -112.2700      17.7        39       132        60
OIR    2025250     91400   17.3900 -112.2800      17.8        39       131        60
OIR    2025250     91400   17.3900 -112.2900      17.9        39       132        60
OIR    2025250     91400   17.3900 -112.3000      17.9        39       134        60
OIR    2025250     91400   17.3900 -112.3100      18.0        39       135        60
OIR    2025250     91400   17.3900 -112.3200      18.0        38       135        60
OIR    2025250     91400   17.3900 -112.3300      18.1        38       135        60
OIR    2025250     91400   17.3900 -112.3400      18.1        38       137        60
OIR    2025250     91400   17.3900 -112.3500      18.1        37       140        60
OIR    2025250     91400   17.3900 -112.3600      18.2        37       140        60
OIR    2025250     91400   17.3900 -112.3700      18.2        36       140        60
OIR    2025250     91400   17.3900 -112.3800      18.1        35       139        60
OIR    2025250     91400   17.3900 -112.3900      18.0        33       137        60
OIR    2025250     91400   17.3900 -112.4000      18.0        32       135        60
OIR    2025250     91400   17.3900 -112.4100      18.0        31       136        60
OIR    2025250     91400   17.3900 -112.4200      18.0        30       138        60
OIR    2025250     91400   17.3900 -112.4300      18.0        29       138        60
OIR    2025250     91400   17.3900 -112.4400      18.0        29       136        60
OIR    2025250     91400   17.3900 -112.4500      17.9        28       135        60
OIR    2025250     91400   17.3900 -112.4600      17.9        28       135        60
OIR    2025250     91400   17.3900 -112.4700      17.8        28       134        60
OIR    2025250     91400   17.3900 -112.4800      17.8        27       134        60
OIR    2025250     91400   17.3900 -112.4900      17.7        27       133        60
OIR    2025250     91400   17.3900 -112.5000      17.6        27       133        60
OIR    2025250     91400   17.3900 -112.5100      17.5        27       134        60
OIR    2025250     91400   17.3900 -112.5200      17.4        27       134        60
OIR    2025250     91400   17.3900 -112.5300      17.4        27       135        60
OIR    2025250     91400   17.3900 -112.5400      17.3        27       136        60
OIR    2025250     91400   17.3900 -112.5500      17.2        27       139        60
OIR    2025250     91400   17.3900 -112.5600      17.1        27       142        60
OIR    2025250     91400   17.3900 -112.5700      17.0        27       144        60
OIR    2025250     91400   17.3900 -112.6000      16.7        28       144        60
OIR    2025250     91400   17.3900 -112.6100      16.6        28       144        60
OIR    2025250     91400   17.3900 -112.6500      16.2        28       142        60
OIR    2025250     91400   17.3900 -112.6600      16.1        28       143        60
OIR    2025250     91400   17.3900 -112.6700      16.0        28       145        60
OIR    2025250     91400   17.3900 -112.6800      16.0        28       146        60
OIR    2025250     91400   17.3900 -112.6900      15.9        29       144        60
OIR    2025250     91400   17.3900 -112.7000      15.8        29       143        60
OIR    2025250     91400   17.3900 -112.7100      15.7        29       143        60
OIR    2025250     91400   17.3900 -112.7200      15.7        29       142        60
OIR    2025250     91400   17.3900 -112.7300      15.7        29       141        60
OIR    2025250     91400   17.3900 -112.7400      15.7        30       140        60
OIR    2025250     91400   17.3900 -112.7500      15.7        30       140        60
OIR    2025250     91400   17.3900 -112.7600      15.7        30       141        60
OIR    2025250     91400   17.3900 -112.7700      15.7        30       142        60
OIR    2025250     91400   17.3900 -112.7800      15.6        30       143        60
OIR    2025250     91400   17.3900 -112.7900      15.6        30       143        60
OIR    2025250     91400   17.3900 -112.8000      15.6        30       141        60
OIR    2025250     91400   17.3900 -112.8100      15.6        30       139        60
OIR    2025250     91400   17.3900 -112.8200      15.6        30       140        60
OIR    2025250     91400   17.3900 -112.8300      15.6        30       143        60
OIR    2025250     91400   17.3900 -112.8500      15.6        30       144        60
OIR    2025250     91400   17.3900 -112.8600      15.5        30       143        60
OIR    2025250     91400   17.3900 -112.9100      15.4        30       143        60
OIR    2025250     91400   17.3900 -112.9200      15.4        31       141        60
OIR    2025250     91400   17.3900 -112.9300      15.3        31       139        60
OIR    2025250     91400   17.3900 -112.9400      15.3        31       140        60
OIR    2025250     91400   17.3900 -112.9500      15.3        31       141        60
OIR    2025250     91400   17.3900 -112.9600      15.2        31       142        60
OIR    2025250     91400   17.3900 -112.9700      15.2        31       143        60
OIR    2025250     91400   17.3900 -113.3300      14.6        26       144        60
OIR    2025250     91400   17.3900 -113.3400      14.7        26       140        60
OIR    2025250     91400   17.3900 -113.5000      16.4        22       143        60
OIR    2025250     91400   17.3900 -113.5100      16.2        22       140        60
OIR    2025250     91400   17.3900 -113.5200      15.5        20       137        60
OIR    2025250     91400   17.3900 -113.5300      15.1        16       135        60
OIR    2025250     91400   17.3900 -113.5400      14.6        12       132        60
OIR    2025250     91400   17.3900 -113.5500      14.4        12       131        60
OIR    2025250     91400   17.3900 -113.5600      14.3        12       133        60
OIR    2025250     91400   17.3900 -113.5700      14.1        10       137        60
OIR    2025250     91400   17.3900 -113.5800      13.9        10       142        60
OIR    2025250     91400   17.3800 -111.7500      16.1        47       142        60
OIR    2025250     91400   17.3800 -111.7600      16.1        47       142        60
OIR    2025250     91400   17.3800 -111.7700      16.2        47       142        60
OIR    2025250     91400   17.3800 -111.7800      16.2        47       142        60
OIR    2025250     91400   17.3800 -111.7900      16.3        47       139        60
OIR    2025250     91400   17.3800 -111.8000      16.2        47       138        60
OIR    2025250     91400   17.3800 -111.8100      16.2        47       139        60
OIR    2025250     91400   17.3800 -111.8200      16.0        47       140        60
OIR    2025250     91400   17.3800 -111.8300      15.8        47       141        60
OIR    2025250     91400   17.3800 -111.8400      15.0        47       142        60
OIR    2025250     91400   17.3800 -111.8500      15.0        48       143        60
OIR    2025250     91400   17.3800 -111.8600      14.9        48       144        60
OIR    2025250     91400   17.3800 -112.2300      17.4        40       139        60
OIR    2025250     91400   17.3800 -112.2400      17.5        40       132        60
OIR    2025250     91400   17.3800 -112.2500      17.6        40       132        60
OIR    2025250     91400   17.3800 -112.2600      17.7        40       132        60
OIR    2025250     91400   17.3800 -112.2700      17.8        39       131        60
OIR    2025250     91400   17.3800 -112.2800      17.9        39       131        60
OIR    2025250     91400   17.3800 -112.2900      18.0        39       132        60
OIR    2025250     91400   17.3800 -112.3000      18.0        39       133        60
OIR    2025250     91400   17.3800 -112.3100      18.1        39       135        60
OIR    2025250     91400   17.3800 -112.3200      18.1        39       134        60
OIR    2025250     91400   17.3800 -112.3300      18.1        38       132        60
OIR    2025250     91400   17.3800 -112.3400      18.2        38       134        60
OIR    2025250     91400   17.3800 -112.3500      18.3        38       138        60
OIR    2025250     91400   17.3800 -112.3600      18.3        37       139        60
OIR    2025250     91400   17.3800 -112.3700      18.3        36       139        60
OIR    2025250     91400   17.3800 -112.3800      18.3        36       139        60
OIR    2025250     91400   17.3800 -112.3900      18.2        34       137        60
OIR    2025250     91400   17.3800 -112.4000      18.2        33       135        60
OIR    2025250     91400   17.3800 -112.4100      18.2        32       136        60
OIR    2025250     91400   17.3800 -112.4200      18.1        31       138        60
OIR    2025250     91400   17.3800 -112.4300      18.1        30       138        60
OIR    2025250     91400   17.3800 -112.4400      18.0        30       136        60
OIR    2025250     91400   17.3800 -112.4500      18.0        29       134        60
OIR    2025250     91400   17.3800 -112.4600      17.9        28       134        60
OIR    2025250     91400   17.3800 -112.4700      17.9        28       134        60
OIR    2025250     91400   17.3800 -112.4800      17.8        28       135        60
OIR    2025250     91400   17.3800 -112.4900      17.8        27       136        60
OIR    2025250     91400   17.3800 -112.5000      17.7        27       138        60
OIR    2025250     91400   17.3800 -112.5100      17.6        27       139        60
OIR    2025250     91400   17.3800 -112.5200      17.5        27       139        60
OIR    2025250     91400   17.3800 -112.5300      17.4        27       139        60
OIR    2025250     91400   17.3800 -112.5400      17.3        27       138        60
OIR    2025250     91400   17.3800 -112.5500      17.2        27       141        60
OIR    2025250     91400   17.3800 -112.5600      17.1        28       144        60
OIR    2025250     91400   17.3800 -112.5700      17.0        28       145        60
OIR    2025250     91400   17.3800 -112.6600      16.2        29       145        60
OIR    2025250     91400   17.3800 -112.7000      15.9        29       145        60
OIR    2025250     91400   17.3800 -112.7100      15.8        29       145        60
OIR    2025250     91400   17.3800 -112.7200      15.8        30       144        60
OIR    2025250     91400   17.3800 -112.7300      15.8        30       144        60
OIR    2025250     91400   17.3800 -112.7400      15.8        30       142        60
OIR    2025250     91400   17.3800 -112.7500      15.8        30       142        60
OIR    2025250     91400   17.3800 -112.7600      15.8        30       143        60
OIR    2025250     91400   17.3800 -112.8000      15.8        31       143        60
OIR    2025250     91400   17.3800 -112.8100      15.8        31       141        60
OIR    2025250     91400   17.3800 -112.8200      15.8        31       141        60
OIR    2025250     91400   17.3800 -112.8300      15.8        31       144        60
OIR    2025250     91400   17.3800 -112.8600      15.6        31       142        60
OIR    2025250     91400   17.3800 -112.9200      15.5        31       143        60
OIR    2025250     91400   17.3800 -112.9300      15.4        31       140        60
OIR    2025250     91400   17.3800 -112.9400      15.4        31       139        60
OIR    2025250     91400   17.3800 -112.9500      15.3        31       139        60
OIR    2025250     91400   17.3800 -112.9600      15.3        31       139        60
OIR    2025250     91400   17.3800 -112.9700      15.3        31       140        60
OIR    2025250     91400   17.3800 -112.9800      15.2        31       142        60
OIR    2025250     91400   17.3800 -113.4900      16.4        22       141        60
OIR    2025250     91400   17.3800 -113.5000      16.4        22       137        60
OIR    2025250     91400   17.3800 -113.5100      16.4        22       137        60
OIR    2025250     91400   17.3800 -113.5200      15.9        22       136        60
OIR    2025250     91400   17.3800 -113.5300      15.5        20       136        60
OIR    2025250     91400   17.3800 -113.5400      14.7        13       135        60
OIR    2025250     91400   17.3800 -113.5500      14.5        12       135        60
OIR    2025250     91400   17.3800 -113.5600      14.4        12       137        60
OIR    2025250     91400   17.3800 -113.5700      14.2        11       139        60
OIR    2025250     91400   17.3800 -113.5800      14.0        10       144        60
OIR    2025250     91400   17.3700 -111.7600      16.2        47       143        60
OIR    2025250     91400   17.3700 -111.7700      16.3        47       139        60
OIR    2025250     91400   17.3700 -111.7800      16.3        47       136        60
OIR    2025250     91400   17.3700 -111.7900      16.3        47       134        60
OIR    2025250     91400   17.3700 -111.8000      16.3        47       131        60
OIR    2025250     91400   17.3700 -111.8100      16.3        47       133        60
OIR    2025250     91400   17.3700 -111.8200      16.1        47       135        60
OIR    2025250     91400   17.3700 -111.8300      15.9        47       137        60
OIR    2025250     91400   17.3700 -111.8400      15.0        48       139        60
OIR    2025250     91400   17.3700 -111.8500      14.9        48       141        60
OIR    2025250     91400   17.3700 -111.8600      14.9        48       143        60
OIR    2025250     91400   17.3700 -111.8700      14.9        48       144        60
OIR    2025250     91400   17.3700 -112.2300      17.5        40       144        60
OIR    2025250     91400   17.3700 -112.2400      17.6        40       140        60
OIR    2025250     91400   17.3700 -112.2500      17.7        40       136        60
OIR    2025250     91400   17.3700 -112.2600      17.8        40       134        60
OIR    2025250     91400   17.3700 -112.2700      17.9        40       132        60
OIR    2025250     91400   17.3700 -112.2800      18.0        39       130        60
OIR    2025250     91400   17.3700 -112.2900      18.1        39       130        60
OIR    2025250     91400   17.3700 -112.3000      18.1        39       132        60
OIR    2025250     91400   17.3700 -112.3100      18.1        39       134        60
OIR    2025250     91400   17.3700 -112.3200      18.2        39       134        60
OIR    2025250     91400   17.3700 -112.3300      18.2        39       133        60
OIR    2025250     91400   17.3700 -112.3400      18.3        38       134        60
OIR    2025250     91400   17.3700 -112.3500      18.4        38       136        60
OIR    2025250     91400   17.3700 -112.3600      18.4        37       138        60
OIR    2025250     91400   17.3700 -112.3700      18.4        37       139        60
OIR    2025250     91400   17.3700 -112.3800      18.4        36       139        60
OIR    2025250     91400   17.3700 -112.3900      18.4        35       137        60
OIR    2025250     91400   17.3700 -112.4000      18.3        34       136        60
OIR    2025250     91400   17.3700 -112.4100      18.3        33       136        60
OIR    2025250     91400   17.3700 -112.4200      18.2        32       138        60
OIR    2025250     91400   17.3700 -112.4300      18.2        31       138        60
OIR    2025250     91400   17.3700 -112.4400      18.1        30       137        60
OIR    2025250     91400   17.3700 -112.4500      18.0        30       136        60
OIR    2025250     91400   17.3700 -112.4600      18.0        29       135        60
OIR    2025250     91400   17.3700 -112.4700      17.9        28       135        60
OIR    2025250     91400   17.3700 -112.4800      17.9        28       137        60
OIR    2025250     91400   17.3700 -112.4900      17.8        28       139        60
OIR    2025250     91400   17.3700 -112.5000      17.7        28       140        60
OIR    2025250     91400   17.3700 -112.5100      17.6        27       142        60
OIR    2025250     91400   17.3700 -112.5200      17.6        27       144        60
OIR    2025250     91400   17.3700 -112.5300      17.5        27       142        60
OIR    2025250     91400   17.3700 -112.5400      17.3        28       141        60
OIR    2025250     91400   17.3700 -112.5500      17.2        28       143        60
OIR    2025250     91400   17.3700 -112.7000      16.0        30       145        60
OIR    2025250     91400   17.3700 -112.7100      15.9        30       145        60
OIR    2025250     91400   17.3700 -112.7400      15.9        31       145        60
OIR    2025250     91400   17.3700 -112.7500      15.9        31       145        60
OIR    2025250     91400   17.3700 -112.7800      15.9        31       144        60
OIR    2025250     91400   17.3700 -112.7900      15.9        32       142        60
OIR    2025250     91400   17.3700 -112.8000      16.0        32       142        60
OIR    2025250     91400   17.3700 -112.8100      16.0        32       143        60
OIR    2025250     91400   17.3700 -112.8200      16.0        32       143        60
OIR    2025250     91400   17.3700 -112.8600      15.9        32       143        60
OIR    2025250     91400   17.3700 -112.8700      15.8        32       143        60
OIR    2025250     91400   17.3700 -112.9200      15.6        32       143        60
OIR    2025250     91400   17.3700 -112.9300      15.6        32       142        60
OIR    2025250     91400   17.3700 -112.9400      15.5        32       142        60
OIR    2025250     91400   17.3700 -112.9500      15.5        32       143        60
OIR    2025250     91400   17.3700 -112.9600      15.4        32       143        60
OIR    2025250     91400   17.3700 -112.9700      15.4        32       142        60
OIR    2025250     91400   17.3700 -112.9800      15.4        32       142        60
OIR    2025250     91400   17.3700 -113.4800      16.5        22       138        60
OIR    2025250     91400   17.3700 -113.4900      16.4        22       135        60
OIR    2025250     91400   17.3700 -113.5000      16.4        22       133        60
OIR    2025250     91400   17.3700 -113.5100      16.4        22       133        60
OIR    2025250     91400   17.3700 -113.5200      16.3        22       134        60
OIR    2025250     91400   17.3700 -113.5300      15.8        20       134        60
OIR    2025250     91400   17.3700 -113.5400      15.1        16       135        60
OIR    2025250     91400   17.3700 -113.5500      14.6        14       136        60
OIR    2025250     91400   17.3700 -113.5600      14.4        13       140        60
OIR    2025250     91400   17.3700 -113.5700      14.3        12       143        60
OIR    2025250     91400   17.3600 -111.7600      16.3        47       143        60
OIR    2025250     91400   17.3600 -111.7700      16.3        47       136        60
OIR    2025250     91400   17.3600 -111.7800      16.3        47       131        60
OIR    2025250     91400   17.3600 -111.7900      16.4        47       131        60
OIR    2025250     91400   17.3600 -111.8000      16.4        47       130        60
OIR    2025250     91400   17.3600 -111.8100      16.3        47       131        60
OIR    2025250     91400   17.3600 -111.8200      16.2        47       133        60
OIR    2025250     91400   17.3600 -111.8300      15.9        47       134        60
OIR    2025250     91400   17.3600 -111.8400      15.0        48       135        60
OIR    2025250     91400   17.3600 -111.8500      14.9        48       136        60
OIR    2025250     91400   17.3600 -111.8600      14.9        48       137        60
OIR    2025250     91400   17.3600 -111.8700      14.9        48       137        60
OIR    2025250     91400   17.3600 -111.8800      14.9        48       138        60
OIR    2025250     91400   17.3600 -111.8900      14.9        48       140        60
OIR    2025250     91400   17.3600 -111.9000      15.0        48       142        60
OIR    2025250     91400   17.3600 -112.2500      17.8        40       142        60
OIR    2025250     91400   17.3600 -112.2600      17.9        40       138        60
OIR    2025250     91400   17.3600 -112.2700      18.0        40       134        60
OIR    2025250     91400   17.3600 -112.2800      18.1        40       131        60
OIR    2025250     91400   17.3600 -112.2900      18.1        40       129        60
OIR    2025250     91400   17.3600 -112.3000      18.2        39       131        60
OIR    2025250     91400   17.3600 -112.3100      18.2        39       134        60
OIR    2025250     91400   17.3600 -112.3200      18.2        39       135        60
OIR    2025250     91400   17.3600 -112.3300      18.3        39       135        60
OIR    2025250     91400   17.3600 -112.3400      18.4        39       135        60
OIR    2025250     91400   17.3600 -112.3500      18.4        38       137        60
OIR    2025250     91400   17.3600 -112.3600      18.5        38       138        60
OIR    2025250     91400   17.3600 -112.3700      18.5        37       139        60
OIR    2025250     91400   17.3600 -112.3800      18.5        37       139        60
OIR    2025250     91400   17.3600 -112.3900      18.5        36       139        60
OIR    2025250     91400   17.3600 -112.4000      18.5        35       138        60
OIR    2025250     91400   17.3600 -112.4100      18.5        34       138        60
OIR    2025250     91400   17.3600 -112.4200      18.4        33       138        60
OIR    2025250     91400   17.3600 -112.4300      18.3        32       139        60
OIR    2025250     91400   17.3600 -112.4400      18.2        31       139        60
OIR    2025250     91400   17.3600 -112.4500      18.1        30       139        60
OIR    2025250     91400   17.3600 -112.4600      18.0        30       139        60
OIR    2025250     91400   17.3600 -112.4700      18.0        29       140        60
OIR    2025250     91400   17.3600 -112.4800      17.9        28       140        60
OIR    2025250     91400   17.3600 -112.4900      17.9        28       139        60
OIR    2025250     91400   17.3600 -112.5000      17.8        28       140        60
OIR    2025250     91400   17.3600 -112.5100      17.7        28       143        60
OIR    2025250     91400   17.3600 -112.5300      17.5        28       145        60
OIR    2025250     91400   17.3600 -112.5400      17.4        28       144        60
OIR    2025250     91400   17.3600 -112.5500      17.3        29       145        60
OIR    2025250     91400   17.3600 -112.7100      16.1        31       145        60
OIR    2025250     91400   17.3600 -112.7200      16.1        31       145        60
OIR    2025250     91400   17.3600 -112.7300      16.1        31       144        60
OIR    2025250     91400   17.3600 -112.7800      16.1        32       144        60
OIR    2025250     91400   17.3600 -112.7900      16.1        32       142        60
OIR    2025250     91400   17.3600 -112.8000      16.1        33       141        60
OIR    2025250     91400   17.3600 -112.8100      16.1        33       143        60
OIR    2025250     91400   17.3600 -112.8600      16.1        33       143        60
OIR    2025250     91400   17.3600 -112.8700      16.1        33       142        60
OIR    2025250     91400   17.3600 -112.8800      16.0        33       144        60
OIR    2025250     91400   17.3600 -112.9000      16.0        32       144        60
OIR    2025250     91400   17.3600 -112.9100      15.9        32       143        60
OIR    2025250     91400   17.3600 -112.9200      15.9        32       143        60
OIR    2025250     91400   17.3600 -112.9300      15.8        32       144        60
OIR    2025250     91400   17.3600 -112.9800      15.5        32       143        60
OIR    2025250     91400   17.3600 -113.4800      16.6        22       136        60
OIR    2025250     91400   17.3600 -113.4900      16.6        22       133        60
OIR    2025250     91400   17.3600 -113.5000      16.5        22       132        60
OIR    2025250     91400   17.3600 -113.5100      16.5        22       132        60
OIR    2025250     91400   17.3600 -113.5200      16.4        22       133        60
OIR    2025250     91400   17.3600 -113.5300      16.1        21       134        60
OIR    2025250     91400   17.3600 -113.5400      15.6        19       136        60
OIR    2025250     91400   17.3600 -113.5500      15.1        17       138        60
OIR    2025250     91400   17.3600 -113.5600      14.6        14       142        60
OIR    2025250     91400   17.3500 -111.7500      16.3        47       144        60
OIR    2025250     91400   17.3500 -111.7600      16.3        47       142        60
OIR    2025250     91400   17.3500 -111.7700      16.4        47       134        60
OIR    2025250     91400   17.3500 -111.7800      16.4        47       127        60
OIR    2025250     91400   17.3500 -111.7900      16.4        47       127        60
OIR    2025250     91400   17.3500 -111.8000      16.4        47       127        60
OIR    2025250     91400   17.3500 -111.8100      16.4        47       128        60
OIR    2025250     91400   17.3500 -111.8200      16.4        47       130        60
OIR    2025250     91400   17.3500 -111.8300      16.0        47       131        60
OIR    2025250     91400   17.3500 -111.8400      15.2        47       132        60
OIR    2025250     91400   17.3500 -111.8500      14.9        48       132        60
OIR    2025250     91400   17.3500 -111.8600      14.9        48       131        60
OIR    2025250     91400   17.3500 -111.8700      14.9        48       131        60
OIR    2025250     91400   17.3500 -111.8800      14.9        48       132        60
OIR    2025250     91400   17.3500 -111.8900      15.0        48       134        60
OIR    2025250     91400   17.3500 -111.9000      15.0        48       136        60
OIR    2025250     91400   17.3500 -111.9100      15.0        48       140        60
OIR    2025250     91400   17.3500 -112.2600      18.0        40       141        60
OIR    2025250     91400   17.3500 -112.2700      18.1        40       136        60
OIR    2025250     91400   17.3500 -112.2800      18.2        40       134        60
OIR    2025250     91400   17.3500 -112.2900      18.2        40       133        60
OIR    2025250     91400   17.3500 -112.3000      18.3        40       133        60
OIR    2025250     91400   17.3500 -112.3100      18.3        40       135        60
OIR    2025250     91400   17.3500 -112.3200      18.3        39       135        60
OIR    2025250     91400   17.3500 -112.3300      18.4        39       136        60
OIR    2025250     91400   17.3500 -112.3400      18.4        39       136        60
OIR    2025250     91400   17.3500 -112.3500      18.5        39       137        60
OIR    2025250     91400   17.3500 -112.3600      18.6        38       138        60
OIR    2025250     91400   17.3500 -112.3700      18.6        38       139        60
OIR    2025250     91400   17.3500 -112.3800      18.6        37       139        60
OIR    2025250     91400   17.3500 -112.3900      18.6        37       139        60
OIR    2025250     91400   17.3500 -112.4000      18.6        36       139        60
OIR    2025250     91400   17.3500 -112.4100      18.6        35       138        60
OIR    2025250     91400   17.3500 -112.4200      18.5        34       139        60
OIR    2025250     91400   17.3500 -112.4300      18.5        33       139        60
OIR    2025250     91400   17.3500 -112.4400      18.3        32       140        60
OIR    2025250     91400   17.3500 -112.4500      18.2        31       141        60
OIR    2025250     91400   17.3500 -112.4600      18.2        30       142        60
OIR    2025250     91400   17.3500 -112.4700      18.1        30       142        60
OIR    2025250     91400   17.3500 -112.4800      18.1        29       142        60
OIR    2025250     91400   17.3500 -112.4900      18.0        29       140        60
OIR    2025250     91400   17.3500 -112.5000      17.9        28       139        60
OIR    2025250     91400   17.3500 -112.5100      17.7        28       143        60
OIR    2025250     91400   17.3500 -112.6600      16.5        31       145        60
OIR    2025250     91400   17.3500 -112.7200      16.2        32       143        60
OIR    2025250     91400   17.3500 -112.7300      16.2        32       142        60
OIR    2025250     91400   17.3500 -112.7400      16.2        32       143        60
OIR    2025250     91400   17.3500 -112.7800      16.2        33       143        60
OIR    2025250     91400   17.3500 -112.7900      16.2        33       141        60
OIR    2025250     91400   17.3500 -112.8000      16.2        33       140        60
OIR    2025250     91400   17.3500 -112.8100      16.2        33       141        60
OIR    2025250     91400   17.3500 -112.8200      16.2        33       142        60
OIR    2025250     91400   17.3500 -112.8300      16.2        33       144        60
OIR    2025250     91400   17.3500 -112.8600      16.2        33       144        60
OIR    2025250     91400   17.3500 -112.8700      16.2        33       142        60
OIR    2025250     91400   17.3500 -112.8800      16.2        33       143        60
OIR    2025250     91400   17.3500 -112.9100      16.1        33       143        60
OIR    2025250     91400   17.3500 -112.9200      16.0        33       143        60
OIR    2025250     91400   17.3500 -112.9300      16.0        33       143        60
OIR    2025250     91400   17.3500 -112.9400      15.9        33       143        60
OIR    2025250     91400   17.3500 -112.9500      15.8        33       144        60
OIR    2025250     91400   17.3500 -112.9800      15.7        33       143        60
OIR    2025250     91400   17.3500 -113.4800      16.6        23       139        60
OIR    2025250     91400   17.3500 -113.4900      16.6        23       135        60
OIR    2025250     91400   17.3500 -113.5000      16.5        22       135        60
OIR    2025250     91400   17.3500 -113.5100      16.5        22       135        60
OIR    2025250     91400   17.3500 -113.5200      16.5        22       135        60
OIR    2025250     91400   17.3500 -113.5300      16.3        21       136        60
OIR    2025250     91400   17.3500 -113.5400      15.9        20       138        60
OIR    2025250     91400   17.3500 -113.5500      15.5        18       140        60
OIR    2025250     91400   17.3500 -113.5600      15.0        15       144        60
OIR    2025250     91400   17.3400 -111.7200      16.2        47       144        60
OIR    2025250     91400   17.3400 -111.7300      16.3        47       141        60
OIR    2025250     91400   17.3400 -111.7400      16.3        47       139        60
OIR    2025250     91400   17.3400 -111.7500      16.4        47       138        60
OIR    2025250     91400   17.3400 -111.7600      16.4        47       136        60
OIR    2025250     91400   17.3400 -111.7700      16.4        47       133        60
OIR    2025250     91400   17.3400 -111.7800      16.4        47       129        60
OIR    2025250     91400   17.3400 -111.7900      16.4        47       126        60
OIR    2025250     91400   17.3400 -111.8000      16.4        47       123        60
OIR    2025250     91400   17.3400 -111.8100      16.4        47       123        60
OIR    2025250     91400   17.3400 -111.8200      16.4        47       125        60
OIR    2025250     91400   17.3400 -111.8300      16.3        47       128        60
OIR    2025250     91400   17.3400 -111.8400      15.7        47       128        60
OIR    2025250     91400   17.3400 -111.8500      15.0        48       128        60
OIR    2025250     91400   17.3400 -111.8600      14.9        48       129        60
OIR    2025250     91400   17.3400 -111.8700      14.9        48       129        60
OIR    2025250     91400   17.3400 -111.8800      14.9        48       129        60
OIR    2025250     91400   17.3400 -111.8900      15.0        48       130        60
OIR    2025250     91400   17.3400 -111.9000      15.1        48       131        60
OIR    2025250     91400   17.3400 -111.9100      15.1        48       135        60
OIR    2025250     91400   17.3400 -111.9200      15.1        48       139        60
OIR    2025250     91400   17.3400 -111.9300      15.1        48       142        60
OIR    2025250     91400   17.3400 -112.2600      18.1        40       143        60
OIR    2025250     91400   17.3400 -112.2700      18.2        40       139        60
OIR    2025250     91400   17.3400 -112.2800      18.3        40       137        60
OIR    2025250     91400   17.3400 -112.2900      18.3        40       137        60
OIR    2025250     91400   17.3400 -112.3000      18.3        40       137        60
OIR    2025250     91400   17.3400 -112.3100      18.4        40       136        60
OIR    2025250     91400   17.3400 -112.3200      18.4        40       136        60
OIR    2025250     91400   17.3400 -112.3300      18.5        39       136        60
OIR    2025250     91400   17.3400 -112.3400      18.5        39       136        60
OIR    2025250     91400   17.3400 -112.3500      18.6        39       137        60
OIR    2025250     91400   17.3400 -112.3600      18.6        39       138        60
OIR    2025250     91400   17.3400 -112.3700      18.7        38       138        60
OIR    2025250     91400   17.3400 -112.3800      18.7        38       140        60
OIR    2025250     91400   17.3400 -112.3900      18.8        37       140        60
OIR    2025250     91400   17.3400 -112.4000      18.8        37       138        60
OIR    2025250     91400   17.3400 -112.4100      18.7        36       137        60
OIR    2025250     91400   17.3400 -112.4200      18.7        36       139        60
OIR    2025250     91400   17.3400 -112.4300      18.6        35       140        60
OIR    2025250     91400   17.3400 -112.4400      18.5        34       141        60
OIR    2025250     91400   17.3400 -112.4500      18.5        33       142        60
OIR    2025250     91400   17.3400 -112.4600      18.4        32       142        60
OIR    2025250     91400   17.3400 -112.4700      18.3        31       141        60
OIR    2025250     91400   17.3400 -112.4800      18.2        30       140        60
OIR    2025250     91400   17.3400 -112.4900      18.1        30       141        60
OIR    2025250     91400   17.3400 -112.5000      18.0        30       141        60
OIR    2025250     91400   17.3400 -112.5100      17.8        30       143        60
OIR    2025250     91400   17.3400 -112.7100      16.4        32       145        60
OIR    2025250     91400   17.3400 -112.7200      16.3        32       144        60
OIR    2025250     91400   17.3400 -112.7300      16.3        32       142        60
OIR    2025250     91400   17.3400 -112.7400      16.3        32       143        60
OIR    2025250     91400   17.3400 -112.7500      16.3        32       143        60
OIR    2025250     91400   17.3400 -112.7600      16.2        33       144        60
OIR    2025250     91400   17.3400 -112.7700      16.2        33       143        60
OIR    2025250     91400   17.3400 -112.7800      16.2        33       143        60
OIR    2025250     91400   17.3400 -112.7900      16.2        33       141        60
OIR    2025250     91400   17.3400 -112.8000      16.2        33       139        60
OIR    2025250     91400   17.3400 -112.8100      16.3        33       139        60
OIR    2025250     91400   17.3400 -112.8200      16.3        33       140        60
OIR    2025250     91400   17.3400 -112.8300      16.3        33       142        60
OIR    2025250     91400   17.3400 -112.8700      16.3        34       143        60
OIR    2025250     91400   17.3400 -112.9200      16.1        33       143        60
OIR    2025250     91400   17.3400 -112.9300      16.1        33       142        60
OIR    2025250     91400   17.3400 -112.9400      16.1        33       141        60
OIR    2025250     91400   17.3400 -112.9500      16.0        33       141        60
OIR    2025250     91400   17.3400 -112.9600      16.0        33       142        60
OIR    2025250     91400   17.3400 -112.9700      15.9        33       142        60
OIR    2025250     91400   17.3400 -112.9800      15.9        33       143        60
OIR    2025250     91400   17.3400 -113.4800      16.7        23       141        60
OIR    2025250     91400   17.3400 -113.4900      16.6        23       139        60
OIR    2025250     91400   17.3400 -113.5000      16.6        22       139        60
OIR    2025250     91400   17.3400 -113.5100      16.6        22       140        60
OIR    2025250     91400   17.3400 -113.5200      16.6        21       139        60
OIR    2025250     91400   17.3400 -113.5300      16.6        21       139        60
OIR    2025250     91400   17.3400 -113.5400      16.3        20       140        60
OIR    2025250     91400   17.3400 -113.5500      15.9        18       143        60
OIR    2025250     91400   17.3300 -111.7100      16.3        47       144        60
OIR    2025250     91400   17.3300 -111.7200      16.4        47       141        60
OIR    2025250     91400   17.3300 -111.7300      16.4        47       138        60
OIR    2025250     91400   17.3300 -111.7400      16.4        47       136        60
OIR    2025250     91400   17.3300 -111.7500      16.4        47       133        60
OIR    2025250     91400   17.3300 -111.7600      16.5        47       131        60
OIR    2025250     91400   17.3300 -111.7700      16.5        47       129        60
OIR    2025250     91400   17.3300 -111.7800      16.4        47       128        60
OIR    2025250     91400   17.3300 -111.7900      16.4        47       125        60
OIR    2025250     91400   17.3300 -111.8000      16.4        47       122        60
OIR    2025250     91400   17.3300 -111.8100      16.4        47       120        60
OIR    2025250     91400   17.3300 -111.8200      16.4        47       122        60
OIR    2025250     91400   17.3300 -111.8300      16.4        47       124        60
OIR    2025250     91400   17.3300 -111.8400      16.2        47       125        60
OIR    2025250     91400   17.3300 -111.8500      15.3        47       125        60
OIR    2025250     91400   17.3300 -111.8600      15.0        48       125        60
OIR    2025250     91400   17.3300 -111.8700      15.0        48       126        60
OIR    2025250     91400   17.3300 -111.8800      15.0        48       127        60
OIR    2025250     91400   17.3300 -111.8900      15.1        48       127        60
OIR    2025250     91400   17.3300 -111.9000      15.3        48       127        60
OIR    2025250     91400   17.3300 -111.9100      15.3        48       130        60
OIR    2025250     91400   17.3300 -111.9200      15.3        48       133        60
OIR    2025250     91400   17.3300 -111.9300      15.2        48       137        60
OIR    2025250     91400   17.3300 -111.9400      15.2        48       142        60
OIR    2025250     91400   17.3300 -112.2500      18.1        41       145        60
OIR    2025250     91400   17.3300 -112.2600      18.2        41       142        60
OIR    2025250     91400   17.3300 -112.2700      18.3        41       140        60
OIR    2025250     91400   17.3300 -112.2800      18.4        40       137        60
OIR    2025250     91400   17.3300 -112.2900      18.4        40       136        60
OIR    2025250     91400   17.3300 -112.3000      18.4        40       135        60
OIR    2025250     91400   17.3300 -112.3100      18.4        40       136        60
OIR    2025250     91400   17.3300 -112.3200      18.5        40       136        60
OIR    2025250     91400   17.3300 -112.3300      18.5        40       137        60
OIR    2025250     91400   17.3300 -112.3400      18.6        39       138        60
OIR    2025250     91400   17.3300 -112.3500      18.7        39       137        60
OIR    2025250     91400   17.3300 -112.3600      18.7        39       137        60
OIR    2025250     91400   17.3300 -112.3700      18.8        39       137        60
OIR    2025250     91400   17.3300 -112.3800      18.8        38       138        60
OIR    2025250     91400   17.3300 -112.3900      18.8        38       139        60
OIR    2025250     91400   17.3300 -112.4000      18.8        38       138        60
OIR    2025250     91400   17.3300 -112.4100      18.8        38       137        60
OIR    2025250     91400   17.3300 -112.4200      18.8        37       138        60
OIR    2025250     91400   17.3300 -112.4300      18.8        36       140        60
OIR    2025250     91400   17.3300 -112.4400      18.7        36       141        60
OIR    2025250     91400   17.3300 -112.4500      18.7        35       141        60
OIR    2025250     91400   17.3300 -112.4600      18.6        34       141        60
OIR    2025250     91400   17.3300 -112.4700      18.5        33       140        60
OIR    2025250     91400   17.3300 -112.4800      18.4        32       139        60
OIR    2025250     91400   17.3300 -112.4900      18.3        32       140        60
OIR    2025250     91400   17.3300 -112.5000      18.0        32       141        60
OIR    2025250     91400   17.3300 -112.5100      17.9        32       143        60
OIR    2025250     91400   17.3300 -112.5200      17.7        32       145        60
OIR    2025250     91400   17.3300 -112.7100      16.4        32       144        60
OIR    2025250     91400   17.3300 -112.7200      16.4        32       145        60
OIR    2025250     91400   17.3300 -112.7400      16.4        33       145        60
OIR    2025250     91400   17.3300 -112.7500      16.3        33       142        60
OIR    2025250     91400   17.3300 -112.7600      16.3        33       141        60
OIR    2025250     91400   17.3300 -112.7700      16.3        33       141        60
OIR    2025250     91400   17.3300 -112.7800      16.3        33       141        60
OIR    2025250     91400   17.3300 -112.7900      16.3        33       140        60
OIR    2025250     91400   17.3300 -112.8000      16.3        33       139        60
OIR    2025250     91400   17.3300 -112.8100      16.3        33       139        60
OIR    2025250     91400   17.3300 -112.8200      16.3        34       139        60
OIR    2025250     91400   17.3300 -112.8300      16.3        34       141        60
OIR    2025250     91400   17.3300 -112.9200      16.2        33       144        60
OIR    2025250     91400   17.3300 -112.9300      16.2        33       143        60
OIR    2025250     91400   17.3300 -112.9400      16.2        33       143        60
OIR    2025250     91400   17.3300 -112.9500      16.1        34       143        60
OIR    2025250     91400   17.3300 -112.9600      16.1        34       143        60
OIR    2025250     91400   17.3300 -112.9700      16.1        34       143        60
OIR    2025250     91400   17.3300 -112.9800      16.1        34       144        60
OIR    2025250     91400   17.3300 -113.4800      16.8        23       144        60
OIR    2025250     91400   17.3300 -113.5300      16.7        21       144        60
OIR    2025250     91400   17.3300 -113.5400      16.5        20       143        60
OIR    2025250     91400   17.3200 -111.7100      16.4        46       142        60
OIR    2025250     91400   17.3200 -111.7200      16.5        46       139        60
OIR    2025250     91400   17.3200 -111.7300      16.5        46       137        60
OIR    2025250     91400   17.3200 -111.7400      16.5        46       135        60
OIR    2025250     91400   17.3200 -111.7500      16.5        46       131        60
OIR    2025250     91400   17.3200 -111.7600      16.5        46       127        60
OIR    2025250     91400   17.3200 -111.7700      16.5        47       125        60
OIR    2025250     91400   17.3200 -111.7800      16.5        47       125        60
OIR    2025250     91400   17.3200 -111.7900      16.4        47       124        60
OIR    2025250     91400   17.3200 -111.8000      16.4        47       122        60
OIR    2025250     91400   17.3200 -111.8100      16.4        47       120        60
OIR    2025250     91400   17.3200 -111.8200      16.4        47       121        60
OIR    2025250     91400   17.3200 -111.8300      16.4        47       121        60
OIR    2025250     91400   17.3200 -111.8400      16.3        47       121        60
OIR    2025250     91400   17.3200 -111.8500      16.0        47       120        60
OIR    2025250     91400   17.3200 -111.8600      15.5        48       120        60
OIR    2025250     91400   17.3200 -111.8700      15.3        48       123        60
OIR    2025250     91400   17.3200 -111.8800      15.3        48       126        60
OIR    2025250     91400   17.3200 -111.8900      15.5        48       127        60
OIR    2025250     91400   17.3200 -111.9000      15.5        48       127        60
OIR    2025250     91400   17.3200 -111.9100      15.5        48       130        60
OIR    2025250     91400   17.3200 -111.9200      15.5        47       132        60
OIR    2025250     91400   17.3200 -111.9300      15.5        47       135        60
OIR    2025250     91400   17.3200 -111.9400      15.4        47       139        60
OIR    2025250     91400   17.3200 -111.9500      15.3        48       142        60
OIR    2025250     91400   17.3200 -111.9600      15.2        48       144        60
OIR    2025250     91400   17.3200 -112.2500      18.2        41       143        60
OIR    2025250     91400   17.3200 -112.2600      18.3        41       141        60
OIR    2025250     91400   17.3200 -112.2700      18.4        41       140        60
OIR    2025250     91400   17.3200 -112.2800      18.4        41       138        60
OIR    2025250     91400   17.3200 -112.2900      18.5        41       135        60
OIR    2025250     91400   17.3200 -112.3000      18.5        40       132        60
OIR    2025250     91400   17.3200 -112.3100      18.5        40       134        60
OIR    2025250     91400   17.3200 -112.3200      18.6        40       135        60
OIR    2025250     91400   17.3200 -112.3300      18.6        40       137        60
OIR    2025250     91400   17.3200 -112.3400      18.7        40       139        60
OIR    2025250     91400   17.3200 -112.3500      18.7        39       138        60
OIR    2025250     91400   17.3200 -112.3600      18.8        39       136        60
OIR    2025250     91400   17.3200 -112.3700      18.8        39       135        60
OIR    2025250     91400   17.3200 -112.3800      18.9        39       136        60
OIR    2025250     91400   17.3200 -112.3900      18.9        39       136        60
OIR    2025250     91400   17.3200 -112.4000      18.9        39       137        60
OIR    2025250     91400   17.3200 -112.4100      18.9        39       137        60
OIR    2025250     91400   17.3200 -112.4200      18.9        38       138        60
OIR    2025250     91400   17.3200 -112.4300      18.9        38       138        60
OIR    2025250     91400   17.3200 -112.4400      18.9        38       139        60
OIR    2025250     91400   17.3200 -112.4500      18.9        37       140        60
OIR    2025250     91400   17.3200 -112.4600      18.8        36       140        60
OIR    2025250     91400   17.3200 -112.4700      18.7        36       139        60
OIR    2025250     91400   17.3200 -112.4800      18.6        35       138        60
OIR    2025250     91400   17.3200 -112.4900      18.4        35       139        60
OIR    2025250     91400   17.3200 -112.5000      18.2        34       140        60
OIR    2025250     91400   17.3200 -112.5100      18.1        34       142        60
OIR    2025250     91400   17.3200 -112.5200      17.9        34       144        60
OIR    2025250     91400   17.3200 -112.7100      16.5        33       145        60
OIR    2025250     91400   17.3200 -112.7500      16.4        33       143        60
OIR    2025250     91400   17.3200 -112.7600      16.3        33       140        60
OIR    2025250     91400   17.3200 -112.7700      16.3        33       140        60
OIR    2025250     91400   17.3200 -112.7800      16.3        33       141        60
OIR    2025250     91400   17.3200 -112.7900      16.3        33       140        60
OIR    2025250     91400   17.3200 -112.8000      16.3        34       140        60
OIR    2025250     91400   17.3200 -112.8100      16.3        34       139        60
OIR    2025250     91400   17.3200 -112.8200      16.3        34       139        60
OIR    2025250     91400   17.3200 -112.8300      16.3        34       140        60
OIR    2025250     91400   17.3200 -112.8400      16.4        34       144        60
OIR    2025250     91400   17.3200 -113.4500      17.2        24       144        60
OIR    2025250     91400   17.3200 -113.4600      17.1        24       144        60
OIR    2025250     91400   17.3100 -111.6500      16.8        45       142        60
OIR    2025250     91400   17.3100 -111.6600      16.6        45       143        60
OIR    2025250     91400   17.3100 -111.6700      16.4        46       144        60
OIR    2025250     91400   17.3100 -111.6800      16.4        46       143        60
OIR    2025250     91400   17.3100 -111.6900      16.4        46       142        60
OIR    2025250     91400   17.3100 -111.7000      16.5        46       140        60
OIR    2025250     91400   17.3100 -111.7100      16.5        46       138        60
OIR    2025250     91400   17.3100 -111.7200      16.6        46       135        60
OIR    2025250     91400   17.3100 -111.7300      16.6        46       133        60
OIR    2025250     91400   17.3100 -111.7400      16.6        46       130        60
OIR    2025250     91400   17.3100 -111.7500      16.6        46       127        60
OIR    2025250     91400   17.3100 -111.7600      16.6        46       124        60
OIR    2025250     91400   17.3100 -111.7700      16.6        46       121        60
OIR    2025250     91400   17.3100 -111.7800      16.6        47       122        60
OIR    2025250     91400   17.3100 -111.7900      16.5        47       122        60
OIR    2025250     91400   17.3100 -111.8000      16.5        47       122        60
OIR    2025250     91400   17.3100 -111.8100      16.4        47       121        60
OIR    2025250     91400   17.3100 -111.8200      16.4        47       120        60
OIR    2025250     91400   17.3100 -111.8300      16.4        47       117        60
OIR    2025250     91400   17.3100 -111.8400      16.4        47       116        60
OIR    2025250     91400   17.3100 -111.8500      16.2        47       116        60
OIR    2025250     91400   17.3100 -111.8600      15.9        48       115        60
OIR    2025250     91400   17.3100 -111.8700      15.8        48       119        60
OIR    2025250     91400   17.3100 -111.8800      15.8        48       123        60
OIR    2025250     91400   17.3100 -111.8900      15.8        48       126        60
OIR    2025250     91400   17.3100 -111.9000      15.7        48       127        60
OIR    2025250     91400   17.3100 -111.9100      15.7        47       129        60
OIR    2025250     91400   17.3100 -111.9200      15.7        47       132        60
OIR    2025250     91400   17.3100 -111.9300      15.6        47       135        60
OIR    2025250     91400   17.3100 -111.9400      15.6        47       136        60
OIR    2025250     91400   17.3100 -111.9500      15.4        48       137        60
OIR    2025250     91400   17.3100 -111.9600      15.3        48       139        60
OIR    2025250     91400   17.3100 -111.9700      15.3        48       141        60
OIR    2025250     91400   17.3100 -111.9800      15.3        48       141        60
OIR    2025250     91400   17.3100 -111.9900      15.4        47       140        60
OIR    2025250     91400   17.3100 -112.0000      15.4        47       139        60
OIR    2025250     91400   17.3100 -112.0100      15.4        47       142        60
OIR    2025250     91400   17.3100 -112.2600      18.3        41       144        60
OIR    2025250     91400   17.3100 -112.2700      18.4        41       141        60
OIR    2025250     91400   17.3100 -112.2800      18.5        41       138        60
OIR    2025250     91400   17.3100 -112.2900      18.5        41       135        60
OIR    2025250     91400   17.3100 -112.3000      18.5        40       133        60
OIR    2025250     91400   17.3100 -112.3100      18.6        40       134        60
OIR    2025250     91400   17.3100 -112.3200      18.6        40       135        60
OIR    2025250     91400   17.3100 -112.3300      18.7        40       136        60
OIR    2025250     91400   17.3100 -112.3400      18.7        40       137        60
OIR    2025250     91400   17.3100 -112.3500      18.8        40       138        60
OIR    2025250     91400   17.3100 -112.3600      18.8        39       137        60
OIR    2025250     91400   17.3100 -112.3700      18.9        39       137        60
OIR    2025250     91400   17.3100 -112.3800      18.9        39       136        60
OIR    2025250     91400   17.3100 -112.3900      19.0        39       135        60
OIR    2025250     91400   17.3100 -112.4000      19.0        39       137        60
OIR    2025250     91400   17.3100 -112.4100      19.0        39       138        60
OIR    2025250     91400   17.3100 -112.4200      19.0        39       139        60
OIR    2025250     91400   17.3100 -112.4300      19.0        39       138        60
OIR    2025250     91400   17.3100 -112.4400      19.0        39       138        60
OIR    2025250     91400   17.3100 -112.4500      19.0        39       138        60
OIR    2025250     91400   17.3100 -112.4600      19.0        38       138        60
OIR    2025250     91400   17.3100 -112.4700      19.0        38       138        60
OIR    2025250     91400   17.3100 -112.4800      18.9        38       139        60
OIR    2025250     91400   17.3100 -112.4900      18.8        38       139        60
OIR    2025250     91400   17.3100 -112.5000      18.6        37       139        60
OIR    2025250     91400   17.3100 -112.5100      18.5        37       140        60
OIR    2025250     91400   17.3100 -112.5200      18.4        37       143        60
OIR    2025250     91400   17.3100 -112.5700      18.1        36       145        60
OIR    2025250     91400   17.3100 -112.5800      18.0        35       145        60
OIR    2025250     91400   17.3100 -112.5900      17.6        35       145        60
OIR    2025250     91400   17.3100 -112.6000      17.3        34       145        60
OIR    2025250     91400   17.3100 -112.6900      16.6        33       144        60
OIR    2025250     91400   17.3100 -112.7000      16.6        33       145        60
OIR    2025250     91400   17.3100 -112.7500      16.5        33       144        60
OIR    2025250     91400   17.3100 -112.7600      16.4        33       141        60
OIR    2025250     91400   17.3100 -112.7700      16.4        33       141        60
OIR    2025250     91400   17.3100 -112.7800      16.4        34       141        60
OIR    2025250     91400   17.3100 -112.7900      16.4        34       141        60
OIR    2025250     91400   17.3100 -112.8000      16.4        34       141        60
OIR    2025250     91400   17.3100 -112.8100      16.4        34       141        60
OIR    2025250     91400   17.3100 -112.8200      16.4        34       141        60
OIR    2025250     91400   17.3100 -112.8300      16.4        34       141        60
OIR    2025250     91400   17.3100 -112.8400      16.4        34       143        60
OIR    2025250     91400   17.3100 -113.4200      18.8        30       141        60
OIR    2025250     91400   17.3100 -113.4300      18.7        29       138        60
OIR    2025250     91400   17.3100 -113.4400      18.2        26       138        60
OIR    2025250     91400   17.3100 -113.4500      17.4        24       139        60
OIR    2025250     91400   17.3100 -113.4600      17.1        24       142        60
OIR    2025250     91400   17.3000 -111.4800      16.2        49       142        60
OIR    2025250     91400   17.3000 -111.4900      16.4        48       140        60
OIR    2025250     91400   17.3000 -111.5000      16.5        47       142        60
OIR    2025250     91400   17.3000 -111.5100      16.6        46       143        60
OIR    2025250     91400   17.3000 -111.6400      17.1        44       142        60
OIR    2025250     91400   17.3000 -111.6500      17.1        44       138        60
OIR    2025250     91400   17.3000 -111.6600      17.0        44       137        60
OIR    2025250     91400   17.3000 -111.6700      16.8        45       138        60
OIR    2025250     91400   17.3000 -111.6800      16.7        46       138        60
OIR    2025250     91400   17.3000 -111.6900      16.6        46       136        60
OIR    2025250     91400   17.3000 -111.7000      16.6        46       135        60
OIR    2025250     91400   17.3000 -111.7100      16.6        46       132        60
OIR    2025250     91400   17.3000 -111.7200      16.6        46       129        60
OIR    2025250     91400   17.3000 -111.7300      16.6        46       125        60
OIR    2025250     91400   17.3000 -111.7400      16.6        46       122        60
OIR    2025250     91400   17.3000 -111.7500      16.6        46       120        60
OIR    2025250     91400   17.3000 -111.7600      16.6        46       120        60
OIR    2025250     91400   17.3000 -111.7700      16.6        46       119        60
OIR    2025250     91400   17.3000 -111.7800      16.6        46       120        60
OIR    2025250     91400   17.3000 -111.7900      16.6        46       120        60
OIR    2025250     91400   17.3000 -111.8000      16.5        47       120        60
OIR    2025250     91400   17.3000 -111.8100      16.5        47       120        60
OIR    2025250     91400   17.3000 -111.8200      16.5        47       117        60
OIR    2025250     91400   17.3000 -111.8300      16.4        47       116        60
OIR    2025250     91400   17.3000 -111.8400      16.4        47       115        60
OIR    2025250     91400   17.3000 -111.8500      16.3        47       115        60
OIR    2025250     91400   17.3000 -111.8600      16.1        47       114        60
OIR    2025250     91400   17.3000 -111.8700      15.9        48       117        60
OIR    2025250     91400   17.3000 -111.8800      15.9        48       122        60
OIR    2025250     91400   17.3000 -111.8900      15.9        48       126        60
OIR    2025250     91400   17.3000 -111.9000      15.9        48       128        60
OIR    2025250     91400   17.3000 -111.9100      15.9        48       130        60
OIR    2025250     91400   17.3000 -111.9200      15.9        47       132        60
OIR    2025250     91400   17.3000 -111.9300      15.8        47       134        60
OIR    2025250     91400   17.3000 -111.9400      15.7        47       134        60
OIR    2025250     91400   17.3000 -111.9500      15.6        48       135        60
OIR    2025250     91400   17.3000 -111.9600      15.5        48       136        60
OIR    2025250     91400   17.3000 -111.9700      15.4        48       139        60
OIR    2025250     91400   17.3000 -111.9800      15.4        48       140        60
OIR    2025250     91400   17.3000 -111.9900      15.4        48       138        60
OIR    2025250     91400   17.3000 -112.0000      15.5        47       136        60
OIR    2025250     91400   17.3000 -112.0100      15.5        47       140        60
OIR    2025250     91400   17.3000 -112.0200      15.6        47       144        60
OIR    2025250     91400   17.3000 -112.0900      16.8        46       144        60
OIR    2025250     91400   17.3000 -112.2700      18.4        41       143        60
OIR    2025250     91400   17.3000 -112.2800      18.5        41       138        60
OIR    2025250     91400   17.3000 -112.2900      18.5        41       136        60
OIR    2025250     91400   17.3000 -112.3000      18.6        40       133        60
OIR    2025250     91400   17.3000 -112.3100      18.6        40       134        60
OIR    2025250     91400   17.3000 -112.3200      18.7        40       135        60
OIR    2025250     91400   17.3000 -112.3300      18.7        40       136        60
OIR    2025250     91400   17.3000 -112.3400      18.8        40       135        60
OIR    2025250     91400   17.3000 -112.3500      18.8        40       135        60
OIR    2025250     91400   17.3000 -112.3600      18.9        40       138        60
OIR    2025250     91400   17.3000 -112.3700      18.9        40       140        60
OIR    2025250     91400   17.3000 -112.3800      19.0        40       138        60
OIR    2025250     91400   17.3000 -112.3900      19.0        40       135        60
OIR    2025250     91400   17.3000 -112.4000      19.0        40       137        60
OIR    2025250     91400   17.3000 -112.4100      19.0        40       140        60
OIR    2025250     91400   17.3000 -112.4200      19.0        39       141        60
OIR    2025250     91400   17.3000 -112.4300      19.1        39       140        60
OIR    2025250     91400   17.3000 -112.4400      19.1        39       139        60
OIR    2025250     91400   17.3000 -112.4500      19.1        39       138        60
OIR    2025250     91400   17.3000 -112.4600      19.1        39       137        60
OIR    2025250     91400   17.3000 -112.4700      19.1        39       138        60
OIR    2025250     91400   17.3000 -112.4800      19.1        39       140        60
OIR    2025250     91400   17.3000 -112.4900      19.1        39       141        60
OIR    2025250     91400   17.3000 -112.5000      19.1        39       140        60
OIR    2025250     91400   17.3000 -112.5100      19.0        39       139        60
OIR    2025250     91400   17.3000 -112.5200      19.0        39       142        60
OIR    2025250     91400   17.3000 -112.5700      18.9        38       145        60
OIR    2025250     91400   17.3000 -112.5800      18.8        38       144        60
OIR    2025250     91400   17.3000 -112.5900      18.6        38       145        60
OIR    2025250     91400   17.3000 -112.7400      16.6        33       146        60
OIR    2025250     91400   17.3000 -112.7500      16.6        34       144        60
OIR    2025250     91400   17.3000 -112.7600      16.5        33       142        60
OIR    2025250     91400   17.3000 -112.7700      16.4        34       142        60
OIR    2025250     91400   17.3000 -112.7800      16.4        34       143        60
OIR    2025250     91400   17.3000 -112.7900      16.4        34       143        60
OIR    2025250     91400   17.3000 -112.8000      16.4        34       143        60
OIR    2025250     91400   17.3000 -112.8100      16.4        34       143        60
OIR    2025250     91400   17.3000 -112.8200      16.5        34       142        60
OIR    2025250     91400   17.3000 -112.8300      16.5        34       142        60
OIR    2025250     91400   17.3000 -112.8400      16.6        35       143        60
OIR    2025250     91400   17.3000 -113.4100      20.1        31       143        60
OIR    2025250     91400   17.3000 -113.4200      19.8        28       137        60
OIR    2025250     91400   17.3000 -113.4300      19.5        28       134        60
OIR    2025250     91400   17.3000 -113.4400      18.9        27       135        60
OIR    2025250     91400   17.3000 -113.4500      17.8        26       137        60
OIR    2025250     91400   17.3000 -113.4600      17.2        25       142        60
OIR    2025250     91400   17.2900 -111.4700      15.9        51       143        60
OIR    2025250     91400   17.2900 -111.4800      16.4        48       139        60
OIR    2025250     91400   17.2900 -111.4900      16.6        47       136        60
OIR    2025250     91400   17.2900 -111.5000      16.8        46       139        60
OIR    2025250     91400   17.2900 -111.5100      16.8        46       142        60
OIR    2025250     91400   17.2900 -111.5200      16.8        46       143        60
OIR    2025250     91400   17.2900 -111.5300      16.8        46       144        60
OIR    2025250     91400   17.2900 -111.5900      16.8        45       144        60
OIR    2025250     91400   17.2900 -111.6000      17.0        44       143        60
OIR    2025250     91400   17.2900 -111.6100      17.1        44       142        60
OIR    2025250     91400   17.2900 -111.6200      17.1        44       142        60
OIR    2025250     91400   17.2900 -111.6300      17.1        44       142        60
OIR    2025250     91400   17.2900 -111.6400      17.1        44       139        60
OIR    2025250     91400   17.2900 -111.6500      17.1        44       136        60
OIR    2025250     91400   17.2900 -111.6600      17.1        44       134        60
OIR    2025250     91400   17.2900 -111.6700      17.0        44       133        60
OIR    2025250     91400   17.2900 -111.6800      16.9        45       132        60
OIR    2025250     91400   17.2900 -111.6900      16.8        45       132        60
OIR    2025250     91400   17.2900 -111.7000      16.7        46       131        60
OIR    2025250     91400   17.2900 -111.7100      16.7        46       128        60
OIR    2025250     91400   17.2900 -111.7200      16.6        46       124        60
OIR    2025250     91400   17.2900 -111.7300      16.6        46       120        60
OIR    2025250     91400   17.2900 -111.7400      16.6        46       116        60
OIR    2025250     91400   17.2900 -111.7500      16.6        46       115        60
OIR    2025250     91400   17.2900 -111.7600      16.6        46       116        60
OIR    2025250     91400   17.2900 -111.7700      16.6        46       117        60
OIR    2025250     91400   17.2900 -111.7800      16.6        46       117        60
OIR    2025250     91400   17.2900 -111.7900      16.6        46       119        60
OIR    2025250     91400   17.2900 -111.8000      16.6        47       119        60
OIR    2025250     91400   17.2900 -111.8100      16.6        47       117        60
OIR    2025250     91400   17.2900 -111.8200      16.5        47       116        60
OIR    2025250     91400   17.2900 -111.8300      16.5        47       115        60
OIR    2025250     91400   17.2900 -111.8400      16.4        47       114        60
OIR    2025250     91400   17.2900 -111.8500      16.4        47       113        60
OIR    2025250     91400   17.2900 -111.8600      16.1        48       113        60
OIR    2025250     91400   17.2900 -111.8700      16.0        48       116        60
OIR    2025250     91400   17.2900 -111.8800      15.9        48       121        60
OIR    2025250     91400   17.2900 -111.8900      15.9        48       125        60
OIR    2025250     91400   17.2900 -111.9000      15.9        48       128        60
OIR    2025250     91400   17.2900 -111.9100      15.9        48       131        60
OIR    2025250     91400   17.2900 -111.9200      16.0        47       132        60
OIR    2025250     91400   17.2900 -111.9300      16.0        47       133        60
OIR    2025250     91400   17.2900 -111.9400      15.9        48       133        60
OIR    2025250     91400   17.2900 -111.9500      15.8        48       133        60
OIR    2025250     91400   17.2900 -111.9600      15.7        48       135        60
OIR    2025250     91400   17.2900 -111.9700      15.6        48       137        60
OIR    2025250     91400   17.2900 -111.9800      15.6        48       139        60
OIR    2025250     91400   17.2900 -111.9900      15.6        48       138        60
OIR    2025250     91400   17.2900 -112.0000      15.6        48       136        60
OIR    2025250     91400   17.2900 -112.0100      15.7        48       139        60
OIR    2025250     91400   17.2900 -112.0200      15.8        48       142        60
OIR    2025250     91400   17.2900 -112.0900      16.9        46       142        60
OIR    2025250     91400   17.2900 -112.1000      17.1        46       141        60
OIR    2025250     91400   17.2900 -112.1100      17.2        45       142        60
OIR    2025250     91400   17.2900 -112.1200      17.2        45       143        60
OIR    2025250     91400   17.2900 -112.1300      17.2        45       144        60
OIR    2025250     91400   17.2900 -112.2700      18.5        41       143        60
OIR    2025250     91400   17.2900 -112.2800      18.5        41       139        60
OIR    2025250     91400   17.2900 -112.2900      18.6        41       136        60
OIR    2025250     91400   17.2900 -112.3000      18.6        41       133        60
OIR    2025250     91400   17.2900 -112.3100      18.6        40       133        60
OIR    2025250     91400   17.2900 -112.3200      18.7        40       133        60
OIR    2025250     91400   17.2900 -112.3300      18.8        40       134        60
OIR    2025250     91400   17.2900 -112.3400      18.8        40       134        60
OIR    2025250     91400   17.2900 -112.3500      18.9        40       133        60
OIR    2025250     91400   17.2900 -112.3600      18.9        40       135        60
OIR    2025250     91400   17.2900 -112.3700      18.9        40       136        60
OIR    2025250     91400   17.2900 -112.3800      19.0        40       137        60
OIR    2025250     91400   17.2900 -112.3900      19.0        40       136        60
OIR    2025250     91400   17.2900 -112.4000      19.0        40       137        60
OIR    2025250     91400   17.2900 -112.4100      19.1        40       139        60
OIR    2025250     91400   17.2900 -112.4200      19.1        40       140        60
OIR    2025250     91400   17.2900 -112.4300      19.1        40       139        60
OIR    2025250     91400   17.2900 -112.4400      19.1        40       138        60
OIR    2025250     91400   17.2900 -112.4500      19.1        40       138        60
OIR    2025250     91400   17.2900 -112.4600      19.2        40       137        60
OIR    2025250     91400   17.2900 -112.4700      19.2        40       138        60
OIR    2025250     91400   17.2900 -112.4800      19.2        40       141        60
OIR    2025250     91400   17.2900 -112.4900      19.2        40       143        60
OIR    2025250     91400   17.2900 -112.5000      19.2        40       141        60
OIR    2025250     91400   17.2900 -112.5100      19.2        40       139        60
OIR    2025250     91400   17.2900 -112.5200      19.2        40       142        60
OIR    2025250     91400   17.2900 -112.5300      19.2        40       144        60
OIR    2025250     91400   17.2900 -112.5700      19.2        39       146        60
OIR    2025250     91400   17.2900 -112.5800      19.1        39       144        60
OIR    2025250     91400   17.2900 -112.5900      19.1        39       146        60
OIR    2025250     91400   17.2900 -112.7400      17.1        35       143        60
OIR    2025250     91400   17.2900 -112.7500      17.2        35       143        60
OIR    2025250     91400   17.2900 -112.7600      17.1        35       142        60
OIR    2025250     91400   17.2900 -112.7700      16.7        34       143        60
OIR    2025250     91400   17.2900 -112.8300      16.9        36       143        60
OIR    2025250     91400   17.2900 -112.8400      17.1        36       143        60
OIR    2025250     91400   17.2900 -112.8500      17.2        36       143        60
OIR    2025250     91400   17.2900 -113.4000      20.9        31       144        60
OIR    2025250     91400   17.2900 -113.4100      21.2        30       138        60
OIR    2025250     91400   17.2900 -113.4200      20.8        28       134        60
OIR    2025250     91400   17.2900 -113.4300      19.9        28       132        60
OIR    2025250     91400   17.2900 -113.4400      19.2        29       135        60
OIR    2025250     91400   17.2900 -113.4500      18.5        29       138        60
OIR    2025250     91400   17.2900 -113.4600      17.8        28       142        60
OIR    2025250     91400   17.2800 -111.4600      15.4        52       143        60
OIR    2025250     91400   17.2800 -111.4700      16.2        49       140        60
OIR    2025250     91400   17.2800 -111.4800      16.8        47       137        60
OIR    2025250     91400   17.2800 -111.4900      16.9        46       134        60
OIR    2025250     91400   17.2800 -111.5000      17.0        45       136        60
OIR    2025250     91400   17.2800 -111.5100      17.1        45       139        60
OIR    2025250     91400   17.2800 -111.5200      17.1        45       141        60
OIR    2025250     91400   17.2800 -111.5300      17.2        45       143        60
OIR    2025250     91400   17.2800 -111.5700      16.9        45       143        60
OIR    2025250     91400   17.2800 -111.5800      17.0        45       141        60
OIR    2025250     91400   17.2800 -111.5900      17.1        44       139        60
OIR    2025250     91400   17.2800 -111.6000      17.1        44       137        60
OIR    2025250     91400   17.2800 -111.6100      17.1        44       136        60
OIR    2025250     91400   17.2800 -111.6200      17.1        44       136        60
OIR    2025250     91400   17.2800 -111.6300      17.1        44       136        60
OIR    2025250     91400   17.2800 -111.6400      17.1        44       136        60
OIR    2025250     91400   17.2800 -111.6500      17.1        44       135        60
OIR    2025250     91400   17.2800 -111.6600      17.1        44       133        60
OIR    2025250     91400   17.2800 -111.6700      17.1        44       129        60
OIR    2025250     91400   17.2800 -111.6800      17.0        44       126        60
OIR    2025250     91400   17.2800 -111.6900      16.9        45       127        60
OIR    2025250     91400   17.2800 -111.7000      16.8        45       128        60
OIR    2025250     91400   17.2800 -111.7100      16.7        46       124        60
OIR    2025250     91400   17.2800 -111.7200      16.7        46       119        60
OIR    2025250     91400   17.2800 -111.7300      16.7        46       115        60
OIR    2025250     91400   17.2800 -111.7400      16.7        46       114        60
OIR    2025250     91400   17.2800 -111.7500      16.6        46       112        60
OIR    2025250     91400   17.2800 -111.7600      16.6        46       115        60
OIR    2025250     91400   17.2800 -111.7700      16.6        46       116        60
OIR    2025250     91400   17.2800 -111.7800      16.6        46       116        60
OIR    2025250     91400   17.2800 -111.7900      16.6        47       116        60
OIR    2025250     91400   17.2800 -111.8000      16.6        47       116        60
OIR    2025250     91400   17.2800 -111.8100      16.6        47       115        60
OIR    2025250     91400   17.2800 -111.8200      16.6        47       114        60
OIR    2025250     91400   17.2800 -111.8300      16.5        47       114        60
OIR    2025250     91400   17.2800 -111.8400      16.5        47       114        60
OIR    2025250     91400   17.2800 -111.8500      16.4        47       115        60
OIR    2025250     91400   17.2800 -111.8600      16.2        48       115        60
OIR    2025250     91400   17.2800 -111.8700      16.0        48       116        60
OIR    2025250     91400   17.2800 -111.8800      15.9        48       120        60
OIR    2025250     91400   17.2800 -111.8900      15.9        48       123        60
OIR    2025250     91400   17.2800 -111.9000      16.0        48       126        60
OIR    2025250     91400   17.2800 -111.9100      16.0        48       129        60
OIR    2025250     91400   17.2800 -111.9200      16.1        47       130        60
OIR    2025250     91400   17.2800 -111.9300      16.1        47       131        60
OIR    2025250     91400   17.2800 -111.9400      16.1        48       132        60
OIR    2025250     91400   17.2800 -111.9500      16.0        48       132        60
OIR    2025250     91400   17.2800 -111.9600      16.0        48       132        60
OIR    2025250     91400   17.2800 -111.9700      15.9        48       134        60
OIR    2025250     91400   17.2800 -111.9800      15.9        48       135        60
OIR    2025250     91400   17.2800 -111.9900      15.9        48       135        60
OIR    2025250     91400   17.2800 -112.0000      15.9        48       135        60
OIR    2025250     91400   17.2800 -112.0100      16.0        48       136        60
OIR    2025250     91400   17.2800 -112.0200      16.1        47       139        60
OIR    2025250     91400   17.2800 -112.0300      16.2        47       141        60
OIR    2025250     91400   17.2800 -112.0400      16.3        47       143        60
OIR    2025250     91400   17.2800 -112.0500      16.4        47       144        60
OIR    2025250     91400   17.2800 -112.0600      16.6        47       144        60
OIR    2025250     91400   17.2800 -112.0700      16.7        47       144        60
OIR    2025250     91400   17.2800 -112.0800      17.0        46       143        60
OIR    2025250     91400   17.2800 -112.0900      17.1        46       142        60
OIR    2025250     91400   17.2800 -112.1000      17.2        46       140        60
OIR    2025250     91400   17.2800 -112.1100      17.3        45       140        60
OIR    2025250     91400   17.2800 -112.1200      17.3        45       140        60
OIR    2025250     91400   17.2800 -112.1300      17.3        45       142        60
OIR    2025250     91400   17.2800 -112.1400      17.4        45       144        60
OIR    2025250     91400   17.2800 -112.2600      18.4        41       144        60
OIR    2025250     91400   17.2800 -112.2700      18.5        41       142        60
OIR    2025250     91400   17.2800 -112.2800      18.5        41       139        60
OIR    2025250     91400   17.2800 -112.2900      18.6        41       136        60
OIR    2025250     91400   17.2800 -112.3000      18.6        41       133        60
OIR    2025250     91400   17.2800 -112.3100      18.7        41       131        60
OIR    2025250     91400   17.2800 -112.3200      18.7        40       132        60
OIR    2025250     91400   17.2800 -112.3300      18.8        40       132        60
OIR    2025250     91400   17.2800 -112.3400      18.9        40       132        60
OIR    2025250     91400   17.2800 -112.3500      18.9        40       131        60
OIR    2025250     91400   17.2800 -112.3600      18.9        40       131        60
OIR    2025250     91400   17.2800 -112.3700      19.0        40       130        60
OIR    2025250     91400   17.2800 -112.3800      19.0        40       132        60
OIR    2025250     91400   17.2800 -112.3900      19.0        40       136        60
OIR    2025250     91400   17.2800 -112.4000      19.1        40       139        60
OIR    2025250     91400   17.2800 -112.4100      19.1        40       138        60
OIR    2025250     91400   17.2800 -112.4200      19.1        40       138        60
OIR    2025250     91400   17.2800 -112.4300      19.1        40       137        60
OIR    2025250     91400   17.2800 -112.4400      19.2        40       137        60
OIR    2025250     91400   17.2800 -112.4500      19.2        40       138        60
OIR    2025250     91400   17.2800 -112.4600      19.2        40       139        60
OIR    2025250     91400   17.2800 -112.4700      19.2        40       141        60
OIR    2025250     91400   17.2800 -112.4800      19.2        40       142        60
OIR    2025250     91400   17.2800 -112.4900      19.2        40       143        60
OIR    2025250     91400   17.2800 -112.5000      19.2        40       143        60
OIR    2025250     91400   17.2800 -112.5100      19.2        40       143        60
OIR    2025250     91400   17.2800 -112.5200      19.2        40       143        60
OIR    2025250     91400   17.2800 -112.5300      19.2        40       143        60
OIR    2025250     91400   17.2800 -112.5400      19.2        40       144        60
OIR    2025250     91400   17.2800 -112.5500      19.2        40       145        60
OIR    2025250     91400   17.2800 -112.5800      19.3        40       146        60
OIR    2025250     91400   17.2800 -112.5900      19.3        39       145        60
OIR    2025250     91400   17.2800 -112.7400      18.3        37       145        60
OIR    2025250     91400   17.2800 -112.7500      18.4        37       144        60
OIR    2025250     91400   17.2800 -112.7600      18.6        37       144        60
OIR    2025250     91400   17.2800 -112.8400      18.2        38       144        60
OIR    2025250     91400   17.2800 -112.8500      18.2        38       143        60
OIR    2025250     91400   17.2800 -112.8600      18.2        37       143        60
OIR    2025250     91400   17.2800 -113.4100      21.4        30       141        60
OIR    2025250     91400   17.2800 -113.4200      21.2        30       137        60
OIR    2025250     91400   17.2800 -113.4300      20.2        30       134        60
OIR    2025250     91400   17.2800 -113.4400      19.0        30       137        60
OIR    2025250     91400   17.2800 -113.4500      18.6        30       139        60
OIR    2025250     91400   17.2800 -113.4600      18.4        30       143        60
OIR    2025250     91400   17.2700 -111.4600      15.8        49       142        60
OIR    2025250     91400   17.2700 -111.4700      16.5        47       139        60
OIR    2025250     91400   17.2700 -111.4800      17.0        46       137        60
OIR    2025250     91400   17.2700 -111.4900      17.1        45       135        60
OIR    2025250     91400   17.2700 -111.5000      17.2        45       135        60
OIR    2025250     91400   17.2700 -111.5100      17.3        44       136        60
OIR    2025250     91400   17.2700 -111.5200      17.4        44       138        60
OIR    2025250     91400   17.2700 -111.5300      17.5        44       141        60
OIR    2025250     91400   17.2700 -111.5400      17.5        44       143        60
OIR    2025250     91400   17.2700 -111.5500      17.4        44       141        60
OIR    2025250     91400   17.2700 -111.5600      17.3        44       139        60
OIR    2025250     91400   17.2700 -111.5700      17.3        44       138        60
OIR    2025250     91400   17.2700 -111.5800      17.3        44       136        60
OIR    2025250     91400   17.2700 -111.5900      17.3        44       134        60
OIR    2025250     91400   17.2700 -111.6000      17.3        44       131        60
OIR    2025250     91400   17.2700 -111.6100      17.2        44       128        60
OIR    2025250     91400   17.2700 -111.6200      17.2        44       128        60
OIR    2025250     91400   17.2700 -111.6300      17.2        44       129        60
OIR    2025250     91400   17.2700 -111.6400      17.2        44       128        60
OIR    2025250     91400   17.2700 -111.6500      17.2        44       127        60
OIR    2025250     91400   17.2700 -111.6600      17.1        44       126        60
OIR    2025250     91400   17.2700 -111.6700      17.1        44       123        60
OIR    2025250     91400   17.2700 -111.6800      17.1        44       119        60
OIR    2025250     91400   17.2700 -111.6900      17.0        45       120        60
OIR    2025250     91400   17.2700 -111.7000      16.9        45       120        60
OIR    2025250     91400   17.2700 -111.7100      16.8        46       117        60
OIR    2025250     91400   17.2700 -111.7200      16.7        46       115        60
OIR    2025250     91400   17.2700 -111.7300      16.7        46       112        60
OIR    2025250     91400   17.2700 -111.7400      16.7        46       112        60
OIR    2025250     91400   17.2700 -111.7500      16.7        46       111        60
OIR    2025250     91400   17.2700 -111.7600      16.7        46       113        60
OIR    2025250     91400   17.2700 -111.7700      16.7        47       115        60
OIR    2025250     91400   17.2700 -111.7800      16.6        47       116        60
OIR    2025250     91400   17.2700 -111.7900      16.6        47       115        60
OIR    2025250     91400   17.2700 -111.8000      16.6        47       115        60
OIR    2025250     91400   17.2700 -111.8100      16.6        47       114        60
OIR    2025250     91400   17.2700 -111.8200      16.6        47       113        60
OIR    2025250     91400   17.2700 -111.8300      16.6        47       113        60
OIR    2025250     91400   17.2700 -111.8400      16.6        47       114        60
OIR    2025250     91400   17.2700 -111.8500      16.6        47       115        60
OIR    2025250     91400   17.2700 -111.8600      16.5        47       116        60
OIR    2025250     91400   17.2700 -111.8700      16.1        48       116        60
OIR    2025250     91400   17.2700 -111.8800      16.0        48       119        60
OIR    2025250     91400   17.2700 -111.8900      16.0        48       121        60
OIR    2025250     91400   17.2700 -111.9000      16.1        48       124        60
OIR    2025250     91400   17.2700 -111.9100      16.3        48       126        60
OIR    2025250     91400   17.2700 -111.9200      16.4        48       128        60
OIR    2025250     91400   17.2700 -111.9300      16.4        48       130        60
OIR    2025250     91400   17.2700 -111.9400      16.4        48       131        60
OIR    2025250     91400   17.2700 -111.9500      16.4        48       130        60
OIR    2025250     91400   17.2700 -111.9600      16.4        48       130        60
OIR    2025250     91400   17.2700 -111.9700      16.4        48       131        60
OIR    2025250     91400   17.2700 -111.9800      16.4        48       132        60
OIR    2025250     91400   17.2700 -111.9900      16.4        47       132        60
OIR    2025250     91400   17.2700 -112.0000      16.3        48       132        60
OIR    2025250     91400   17.2700 -112.0100      16.3        47       133        60
OIR    2025250     91400   17.2700 -112.0200      16.3        47       135        60
OIR    2025250     91400   17.2700 -112.0300      16.3        47       136        60
OIR    2025250     91400   17.2700 -112.0400      16.4        47       139        60
OIR    2025250     91400   17.2700 -112.0500      16.6        47       142        60
OIR    2025250     91400   17.2700 -112.0600      16.7        47       141        60
OIR    2025250     91400   17.2700 -112.0700      17.0        46       139        60
OIR    2025250     91400   17.2700 -112.0800      17.2        46       139        60
OIR    2025250     91400   17.2700 -112.0900      17.3        46       140        60
OIR    2025250     91400   17.2700 -112.1000      17.3        45       142        60
OIR    2025250     91400   17.2700 -112.1100      17.4        45       141        60
OIR    2025250     91400   17.2700 -112.1200      17.4        45       140        60
OIR    2025250     91400   17.2700 -112.1300      17.4        45       141        60
OIR    2025250     91400   17.2700 -112.1400      17.4        45       144        60
OIR    2025250     91400   17.2700 -112.2600      18.5        41       144        60
OIR    2025250     91400   17.2700 -112.2700      18.5        41       142        60
OIR    2025250     91400   17.2700 -112.2800      18.5        41       140        60
OIR    2025250     91400   17.2700 -112.2900      18.6        41       138        60
OIR    2025250     91400   17.2700 -112.3000      18.6        41       135        60
OIR    2025250     91400   17.2700 -112.3100      18.7        41       133        60
OIR    2025250     91400   17.2700 -112.3200      18.8        41       133        60
OIR    2025250     91400   17.2700 -112.3300      18.8        40       134        60
OIR    2025250     91400   17.2700 -112.3400      18.9        40       133        60
OIR    2025250     91400   17.2700 -112.3500      18.9        40       133        60
OIR    2025250     91400   17.2700 -112.3600      19.0        40       131        60
OIR    2025250     91400   17.2700 -112.3700      19.0        40       130        60
OIR    2025250     91400   17.2700 -112.3800      19.0        40       130        60
OIR    2025250     91400   17.2700 -112.3900      19.1        40       135        60
OIR    2025250     91400   17.2700 -112.4000      19.1        40       139        60
OIR    2025250     91400   17.2700 -112.4100      19.1        40       139        60
OIR    2025250     91400   17.2700 -112.4200      19.1        40       138        60
OIR    2025250     91400   17.2700 -112.4300      19.2        40       137        60
OIR    2025250     91400   17.2700 -112.4400      19.2        40       136        60
OIR    2025250     91400   17.2700 -112.4500      19.2        40       137        60
OIR    2025250     91400   17.2700 -112.4600      19.2        40       140        60
OIR    2025250     91400   17.2700 -112.4700      19.2        40       143        60
OIR    2025250     91400   17.2700 -112.4800      19.2        40       143        60
OIR    2025250     91400   17.2700 -112.4900      19.2        40       143        60
OIR    2025250     91400   17.2700 -112.5000      19.2        40       143        60
OIR    2025250     91400   17.2700 -112.5100      19.2        40       144        60
OIR    2025250     91400   17.2700 -112.5200      19.3        40       144        60
OIR    2025250     91400   17.2700 -112.5300      19.3        40       143        60
OIR    2025250     91400   17.2700 -112.5400      19.3        40       143        60
OIR    2025250     91400   17.2700 -112.5500      19.3        40       144        60
OIR    2025250     91400   17.2700 -112.6000      19.4        40       145        60
OIR    2025250     91400   17.2700 -112.6100      19.4        40       144        60
OIR    2025250     91400   17.2700 -113.4200      20.4        32       144        60
OIR    2025250     91400   17.2700 -113.4300      19.5        32       139        60
OIR    2025250     91400   17.2700 -113.4400      18.5        32       140        60
OIR    2025250     91400   17.2700 -113.4500      18.5        31       141        60
OIR    2025250     91400   17.2700 -113.4600      18.5        30       144        60
OIR    2025250     91400   17.2600 -111.4500      16.4        47       143        60
OIR    2025250     91400   17.2600 -111.4600      16.9        46       140        60
OIR    2025250     91400   17.2600 -111.4700      17.2        45       138        60
OIR    2025250     91400   17.2600 -111.4800      17.4        44       136        60
OIR    2025250     91400   17.2600 -111.4900      17.5        44       135        60
OIR    2025250     91400   17.2600 -111.5000      17.5        44       134        60
OIR    2025250     91400   17.2600 -111.5100      17.6        44       135        60
OIR    2025250     91400   17.2600 -111.5200      17.6        44       135        60
OIR    2025250     91400   17.2600 -111.5300      17.6        44       138        60
OIR    2025250     91400   17.2600 -111.5400      17.6        44       141        60
OIR    2025250     91400   17.2600 -111.5500      17.6        44       139        60
OIR    2025250     91400   17.2600 -111.5600      17.5        44       134        60
OIR    2025250     91400   17.2600 -111.5700      17.5        44       132        60
OIR    2025250     91400   17.2600 -111.5800      17.5        43       130        60
OIR    2025250     91400   17.2600 -111.5900      17.4        43       128        60
OIR    2025250     91400   17.2600 -111.6000      17.4        43       125        60
OIR    2025250     91400   17.2600 -111.6100      17.3        43       122        60
OIR    2025250     91400   17.2600 -111.6200      17.2        44       121        60
OIR    2025250     91400   17.2600 -111.6300      17.2        44       121        60
OIR    2025250     91400   17.2600 -111.6400      17.2        44       120        60
OIR    2025250     91400   17.2600 -111.6500      17.2        44       117        60
OIR    2025250     91400   17.2600 -111.6600      17.2        44       116        60
OIR    2025250     91400   17.2600 -111.6700      17.1        44       115        60
OIR    2025250     91400   17.2600 -111.6800      17.1        44       114        60
OIR    2025250     91400   17.2600 -111.6900      17.1        44       112        60
OIR    2025250     91400   17.2600 -111.7000      17.0        45       111        60
OIR    2025250     91400   17.2600 -111.7100      16.8        46       110        60
OIR    2025250     91400   17.2600 -111.7200      16.8        46       110        60
OIR    2025250     91400   17.2600 -111.7300      16.7        46       110        60
OIR    2025250     91400   17.2600 -111.7400      16.7        46       111        60
OIR    2025250     91400   17.2600 -111.7500      16.7        46       112        60
OIR    2025250     91400   17.2600 -111.7600      16.7        47       112        60
OIR    2025250     91400   17.2600 -111.7700      16.7        47       112        60
OIR    2025250     91400   17.2600 -111.7800      16.7        47       112        60
OIR    2025250     91400   17.2600 -111.7900      16.7        47       112        60
OIR    2025250     91400   17.2600 -111.8000      16.7        47       112        60
OIR    2025250     91400   17.2600 -111.8100      16.7        47       113        60
OIR    2025250     91400   17.2600 -111.8200      16.6        47       114        60
OIR    2025250     91400   17.2600 -111.8300      16.6        47       115        60
OIR    2025250     91400   17.2600 -111.8400      16.6        47       115        60
OIR    2025250     91400   17.2600 -111.8500      16.6        47       115        60
OIR    2025250     91400   17.2600 -111.8600      16.6        47       115        60
OIR    2025250     91400   17.2600 -111.8700      16.5        48       115        60
OIR    2025250     91400   17.2600 -111.8800      16.3        48       116        60
OIR    2025250     91400   17.2600 -111.8900      16.3        48       120        60
OIR    2025250     91400   17.2600 -111.9000      16.5        48       122        60
OIR    2025250     91400   17.2600 -111.9100      16.6        48       124        60
OIR    2025250     91400   17.2600 -111.9200      16.6        48       126        60
OIR    2025250     91400   17.2600 -111.9300      16.7        48       127        60
OIR    2025250     91400   17.2600 -111.9400      16.6        48       129        60
OIR    2025250     91400   17.2600 -111.9500      16.6        48       129        60
OIR    2025250     91400   17.2600 -111.9600      16.6        48       130        60
OIR    2025250     91400   17.2600 -111.9700      16.6        48       130        60
OIR    2025250     91400   17.2600 -111.9800      16.6        48       131        60
OIR    2025250     91400   17.2600 -111.9900      16.5        47       132        60
OIR    2025250     91400   17.2600 -112.0000      16.5        48       132        60
OIR    2025250     91400   17.2600 -112.0100      16.5        48       133        60
OIR    2025250     91400   17.2600 -112.0200      16.5        48       134        60
OIR    2025250     91400   17.2600 -112.0300      16.6        47       135        60
OIR    2025250     91400   17.2600 -112.0400      16.7        47       137        60
OIR    2025250     91400   17.2600 -112.0500      16.8        47       139        60
OIR    2025250     91400   17.2600 -112.0600      17.0        47       139        60
OIR    2025250     91400   17.2600 -112.0700      17.2        46       138        60
OIR    2025250     91400   17.2600 -112.0800      17.3        46       137        60
OIR    2025250     91400   17.2600 -112.0900      17.4        45       139        60
OIR    2025250     91400   17.2600 -112.1000      17.4        45       141        60
OIR    2025250     91400   17.2600 -112.1100      17.4        45       141        60
OIR    2025250     91400   17.2600 -112.1200      17.4        45       141        60
OIR    2025250     91400   17.2600 -112.1300      17.5        45       141        60
OIR    2025250     91400   17.2600 -112.1400      17.5        45       143        60
OIR    2025250     91400   17.2600 -112.2600      18.5        42       144        60
OIR    2025250     91400   17.2600 -112.2700      18.5        41       142        60
OIR    2025250     91400   17.2600 -112.2800      18.6        41       140        60
OIR    2025250     91400   17.2600 -112.2900      18.6        41       139        60
OIR    2025250     91400   17.2600 -112.3000      18.7        41       137        60
OIR    2025250     91400   17.2600 -112.3100      18.8        41       136        60
OIR    2025250     91400   17.2600 -112.3200      18.8        41       136        60
OIR    2025250     91400   17.2600 -112.3300      18.9        41       136        60
OIR    2025250     91400   17.2600 -112.3400      18.9        41       136        60
OIR    2025250     91400   17.2600 -112.3500      19.0        40       136        60
OIR    2025250     91400   17.2600 -112.3600      19.0        40       135        60
OIR    2025250     91400   17.2600 -112.3700      19.0        40       132        60
OIR    2025250     91400   17.2600 -112.3800      19.0        40       131        60
OIR    2025250     91400   17.2600 -112.3900      19.1        40       135        60
OIR    2025250     91400   17.2600 -112.4000      19.1        40       138        60
OIR    2025250     91400   17.2600 -112.4100      19.1        40       140        60
OIR    2025250     91400   17.2600 -112.4200      19.1        40       140        60
OIR    2025250     91400   17.2600 -112.4300      19.2        40       139        60
OIR    2025250     91400   17.2600 -112.4400      19.2        40       137        60
OIR    2025250     91400   17.2600 -112.4500      19.2        40       137        60
OIR    2025250     91400   17.2600 -112.4600      19.2        40       140        60
OIR    2025250     91400   17.2600 -112.4700      19.2        40       143        60
OIR    2025250     91400   17.2600 -112.4800      19.2        40       144        60
OIR    2025250     91400   17.2600 -112.4900      19.2        40       144        60
OIR    2025250     91400   17.2600 -112.5000      19.3        40       143        60
OIR    2025250     91400   17.2600 -112.5100      19.3        40       142        60
OIR    2025250     91400   17.2600 -112.5200      19.3        40       142        60
OIR    2025250     91400   17.2600 -112.5300      19.3        40       143        60
OIR    2025250     91400   17.2600 -112.5400      19.3        40       144        60
OIR    2025250     91400   17.2600 -112.5500      19.3        40       143        60
OIR    2025250     91400   17.2600 -112.5600      19.3        40       142        60
OIR    2025250     91400   17.2600 -112.5700      19.3        40       144        60
OIR    2025250     91400   17.2600 -112.6100      19.4        40       145        60
OIR    2025250     91400   17.2500 -111.4300      15.4        52       144        60
OIR    2025250     91400   17.2500 -111.4400      16.4        47       143        60
OIR    2025250     91400   17.2500 -111.4500      17.3        45       141        60
OIR    2025250     91400   17.2500 -111.4600      17.5        44       140        60
OIR    2025250     91400   17.2500 -111.4700      17.6        44       138        60
OIR    2025250     91400   17.2500 -111.4800      17.7        44       137        60
OIR    2025250     91400   17.2500 -111.4900      17.7        44       135        60
OIR    2025250     91400   17.2500 -111.5000      17.6        44       134        60
OIR    2025250     91400   17.2500 -111.5100      17.6        44       134        60
OIR    2025250     91400   17.2500 -111.5200      17.7        44       134        60
OIR    2025250     91400   17.2500 -111.5300      17.7        44       135        60
OIR    2025250     91400   17.2500 -111.5400      17.7        44       136        60
OIR    2025250     91400   17.2500 -111.5500      17.7        43       136        60
OIR    2025250     91400   17.2500 -111.5600      17.6        43       134        60
OIR    2025250     91400   17.2500 -111.5700      17.6        43       131        60
OIR    2025250     91400   17.2500 -111.5800      17.5        43       127        60
OIR    2025250     91400   17.2500 -111.5900      17.5        43       124        60
OIR    2025250     91400   17.2500 -111.6000      17.4        43       121        60
OIR    2025250     91400   17.2500 -111.6100      17.4        43       117        60
OIR    2025250     91400   17.2500 -111.6200      17.3        44       116        60
OIR    2025250     91400   17.2500 -111.6300      17.2        44       116        60
OIR    2025250     91400   17.2500 -111.6400      17.2        44       116        60
OIR    2025250     91400   17.2500 -111.6500      17.2        44       114        60
OIR    2025250     91400   17.2500 -111.6600      17.2        44       112        60
OIR    2025250     91400   17.2500 -111.6700      17.1        44       111        60
OIR    2025250     91400   17.2500 -111.6800      17.1        44       111        60
OIR    2025250     91400   17.2500 -111.6900      17.1        44       110        60
OIR    2025250     91400   17.2500 -111.7000      17.0        45       109        60
OIR    2025250     91400   17.2500 -111.7100      16.8        46       108        60
OIR    2025250     91400   17.2500 -111.7200      16.8        46       107        60
OIR    2025250     91400   17.2500 -111.7300      16.8        47       107        60
OIR    2025250     91400   17.2500 -111.7400      16.7        47       109        60
OIR    2025250     91400   17.2500 -111.7500      16.7        47       111        60
OIR    2025250     91400   17.2500 -111.7600      16.7        47       113        60
OIR    2025250     91400   17.2500 -111.7700      16.7        47       112        60
OIR    2025250     91400   17.2500 -111.7800      16.7        47       111        60
OIR    2025250     91400   17.2500 -111.7900      16.7        47       111        60
OIR    2025250     91400   17.2500 -111.8000      16.7        47       111        60
OIR    2025250     91400   17.2500 -111.8100      16.7        47       113        60
OIR    2025250     91400   17.2500 -111.8200      16.7        47       115        60
OIR    2025250     91400   17.2500 -111.8300      16.7        47       116        60
OIR    2025250     91400   17.2500 -111.8400      16.6        47       116        60
OIR    2025250     91400   17.2500 -111.8500      16.7        47       116        60
OIR    2025250     91400   17.2500 -111.8600      16.7        47       115        60
OIR    2025250     91400   17.2500 -111.8700      16.7        47       114        60
OIR    2025250     91400   17.2500 -111.8800      16.6        48       115        60
OIR    2025250     91400   17.2500 -111.8900      16.6        48       117        60
OIR    2025250     91400   17.2500 -111.9000      16.7        48       120        60
OIR    2025250     91400   17.2500 -111.9100      16.7        48       122        60
OIR    2025250     91400   17.2500 -111.9200      16.8        48       124        60
OIR    2025250     91400   17.2500 -111.9300      16.8        48       125        60
OIR    2025250     91400   17.2500 -111.9400      16.8        48       127        60
OIR    2025250     91400   17.2500 -111.9500      16.8        48       128        60
OIR    2025250     91400   17.2500 -111.9600      16.8        48       129        60
OIR    2025250     91400   17.2500 -111.9700      16.8        47       130        60
OIR    2025250     91400   17.2500 -111.9800      16.7        47       131        60
OIR    2025250     91400   17.2500 -111.9900      16.7        47       132        60
OIR    2025250     91400   17.2500 -112.0000      16.7        47       133        60
OIR    2025250     91400   17.2500 -112.0100      16.7        48       133        60
OIR    2025250     91400   17.2500 -112.0200      16.8        47       134        60
OIR    2025250     91400   17.2500 -112.0300      16.8        47       134        60
OIR    2025250     91400   17.2500 -112.0400      16.9        47       135        60
OIR    2025250     91400   17.2500 -112.0500      17.0        47       137        60
OIR    2025250     91400   17.2500 -112.0600      17.2        46       138        60
OIR    2025250     91400   17.2500 -112.0700      17.3        46       138        60
OIR    2025250     91400   17.2500 -112.0800      17.4        46       138        60
OIR    2025250     91400   17.2500 -112.0900      17.4        45       139        60
OIR    2025250     91400   17.2500 -112.1000      17.5        45       140        60
OIR    2025250     91400   17.2500 -112.1100      17.5        45       141        60
OIR    2025250     91400   17.2500 -112.1200      17.5        45       142        60
OIR    2025250     91400   17.2500 -112.1300      17.5        45       142        60
OIR    2025250     91400   17.2500 -112.1400      17.6        45       142        60
OIR    2025250     91400   17.2500 -112.1500      17.6        44       141        60
OIR    2025250     91400   17.2500 -112.1600      17.7        44       142        60
OIR    2025250     91400   17.2500 -112.1700      17.8        44       144        60
OIR    2025250     91400   17.2500 -112.2700      18.5        41       143        60
OIR    2025250     91400   17.2500 -112.2800      18.6        41       140        60
OIR    2025250     91400   17.2500 -112.2900      18.7        41       137        60
OIR    2025250     91400   17.2500 -112.3000      18.7        41       136        60
OIR    2025250     91400   17.2500 -112.3100      18.8        41       135        60
OIR    2025250     91400   17.2500 -112.3200      18.9        41       135        60
OIR    2025250     91400   17.2500 -112.3300      18.9        41       135        60
OIR    2025250     91400   17.2500 -112.3400      18.9        41       136        60
OIR    2025250     91400   17.2500 -112.3500      19.0        41       136        60
OIR    2025250     91400   17.2500 -112.3600      19.0        41       136        60
OIR    2025250     91400   17.2500 -112.3700      19.0        40       134        60
OIR    2025250     91400   17.2500 -112.3800      19.1        40       133        60
OIR    2025250     91400   17.2500 -112.3900      19.1        40       136        60
OIR    2025250     91400   17.2500 -112.4000      19.1        40       138        60
OIR    2025250     91400   17.2500 -112.4100      19.1        40       139        60
OIR    2025250     91400   17.2500 -112.4200      19.2        40       139        60
OIR    2025250     91400   17.2500 -112.4300      19.2        40       139        60
OIR    2025250     91400   17.2500 -112.4400      19.2        40       138        60
OIR    2025250     91400   17.2500 -112.4500      19.2        40       137        60
OIR    2025250     91400   17.2500 -112.4600      19.2        40       140        60
OIR    2025250     91400   17.2500 -112.4700      19.2        40       143        60
OIR    2025250     91400   17.2500 -112.4800      19.3        40       144        60
OIR    2025250     91400   17.2500 -112.4900      19.3        40       143        60
OIR    2025250     91400   17.2500 -112.5000      19.3        40       143        60
OIR    2025250     91400   17.2500 -112.5100      19.3        40       142        60
OIR    2025250     91400   17.2500 -112.5200      19.3        40       140        60
OIR    2025250     91400   17.2500 -112.5300      19.3        40       143        60
OIR    2025250     91400   17.2500 -112.5400      19.3        40       145        60
OIR    2025250     91400   17.2500 -112.5500      19.3        40       144        60
OIR    2025250     91400   17.2500 -112.5600      19.3        40       141        60
OIR    2025250     91400   17.2500 -112.5700      19.4        40       142        60
OIR    2025250     91400   17.2500 -112.5800      19.4        40       145        60
OIR    2025250     91400   17.2400 -111.4200      15.5        52       144        60
OIR    2025250     91400   17.2400 -111.4300      16.4        48       141        60
OIR    2025250     91400   17.2400 -111.4400      17.3        44       138        60
OIR    2025250     91400   17.2400 -111.4500      17.7        44       136        60
OIR    2025250     91400   17.2400 -111.4600      17.8        44       135        60
OIR    2025250     91400   17.2400 -111.4700      17.8        43       135        60
OIR    2025250     91400   17.2400 -111.4800      17.8        43       134        60
OIR    2025250     91400   17.2400 -111.4900      17.7        43       134        60
OIR    2025250     91400   17.2400 -111.5000      17.7        43       133        60
OIR    2025250     91400   17.2400 -111.5100      17.7        43       133        60
OIR    2025250     91400   17.2400 -111.5200      17.7        43       132        60
OIR    2025250     91400   17.2400 -111.5300      17.7        43       132        60
OIR    2025250     91400   17.2400 -111.5400      17.7        43       132        60
OIR    2025250     91400   17.2400 -111.5500      17.7        43       132        60
OIR    2025250     91400   17.2400 -111.5600      17.7        43       131        60
OIR    2025250     91400   17.2400 -111.5700      17.6        43       131        60
OIR    2025250     91400   17.2400 -111.5800      17.6        43       125        60
OIR    2025250     91400   17.2400 -111.5900      17.5        43       120        60
OIR    2025250     91400   17.2400 -111.6000      17.5        43       116        60
OIR    2025250     91400   17.2400 -111.6100      17.5        43       115        60
OIR    2025250     91400   17.2400 -111.6200      17.4        43       113        60
OIR    2025250     91400   17.2400 -111.6300      17.3        44       113        60
OIR    2025250     91400   17.2400 -111.6400      17.2        44       113        60
OIR    2025250     91400   17.2400 -111.6500      17.2        44       111        60
OIR    2025250     91400   17.2400 -111.6600      17.2        44       110        60
OIR    2025250     91400   17.2400 -111.6700      17.2        44       110        60
OIR    2025250     91400   17.2400 -111.6800      17.1        44       110        60
OIR    2025250     91400   17.2400 -111.6900      17.1        45       110        60
OIR    2025250     91400   17.2400 -111.7000      17.0        46       109        60
OIR    2025250     91400   17.2400 -111.7100      16.8        46       108        60
OIR    2025250     91400   17.2400 -111.7200      16.8        47       105        60
OIR    2025250     91400   17.2400 -111.7300      16.8        47       104        60
OIR    2025250     91400   17.2400 -111.7400      16.8        47       105        60
OIR    2025250     91400   17.2400 -111.7500      16.8        47       109        60
OIR    2025250     91400   17.2400 -111.7600      16.7        47       111        60
OIR    2025250     91400   17.2400 -111.7700      16.7        47       112        60
OIR    2025250     91400   17.2400 -111.7800      16.7        47       113        60
OIR    2025250     91400   17.2400 -111.7900      16.7        47       112        60
OIR    2025250     91400   17.2400 -111.8000      16.7        47       112        60
OIR    2025250     91400   17.2400 -111.8100      16.7        47       113        60
OIR    2025250     91400   17.2400 -111.8200      16.7        47       114        60
OIR    2025250     91400   17.2400 -111.8300      16.7        47       115        60
OIR    2025250     91400   17.2400 -111.8400      16.7        47       115        60
OIR    2025250     91400   17.2400 -111.8500      16.7        47       115        60
OIR    2025250     91400   17.2400 -111.8600      16.7        47       115        60
OIR    2025250     91400   17.2400 -111.8700      16.7        47       114        60
OIR    2025250     91400   17.2400 -111.8800      16.7        47       114        60
OIR    2025250     91400   17.2400 -111.8900      16.8        48       116        60
OIR    2025250     91400   17.2400 -111.9000      16.8        48       116        60
OIR    2025250     91400   17.2400 -111.9100      16.8        48       120        60
OIR    2025250     91400   17.2400 -111.9200      16.8        48       123        60
OIR    2025250     91400   17.2400 -111.9300      16.8        48       124        60
OIR    2025250     91400   17.2400 -111.9400      16.9        48       126        60
OIR    2025250     91400   17.2400 -111.9500      16.9        47       128        60
OIR    2025250     91400   17.2400 -111.9600      16.9        47       129        60
OIR    2025250     91400   17.2400 -111.9700      16.9        47       130        60
OIR    2025250     91400   17.2400 -111.9800      16.9        47       130        60
OIR    2025250     91400   17.2400 -111.9900      16.9        47       131        60
OIR    2025250     91400   17.2400 -112.0000      16.9        47       132        60
OIR    2025250     91400   17.2400 -112.0100      16.9        47       133        60
OIR    2025250     91400   17.2400 -112.0200      17.0        47       134        60
OIR    2025250     91400   17.2400 -112.0300      17.0        47       135        60
OIR    2025250     91400   17.2400 -112.0400      17.1        47       135        60
OIR    2025250     91400   17.2400 -112.0500      17.2        46       136        60
OIR    2025250     91400   17.2400 -112.0600      17.3        46       136        60
OIR    2025250     91400   17.2400 -112.0700      17.4        46       137        60
OIR    2025250     91400   17.2400 -112.0800      17.4        46       138        60
OIR    2025250     91400   17.2400 -112.0900      17.5        45       138        60
OIR    2025250     91400   17.2400 -112.1000      17.5        45       138        60
OIR    2025250     91400   17.2400 -112.1100      17.5        45       139        60
OIR    2025250     91400   17.2400 -112.1200      17.5        45       141        60
OIR    2025250     91400   17.2400 -112.1300      17.6        45       143        60
OIR    2025250     91400   17.2400 -112.1400      17.6        45       141        60
OIR    2025250     91400   17.2400 -112.1500      17.7        44       140        60
OIR    2025250     91400   17.2400 -112.1600      17.7        44       140        60
OIR    2025250     91400   17.2400 -112.1700      17.8        44       141        60
OIR    2025250     91400   17.2400 -112.1800      17.9        44       142        60
OIR    2025250     91400   17.2400 -112.1900      17.9        43       143        60
OIR    2025250     91400   17.2400 -112.2000      18.1        43       144        60
OIR    2025250     91400   17.2400 -112.2100      18.2        43       144        60
OIR    2025250     91400   17.2400 -112.2200      18.3        42       143        60
OIR    2025250     91400   17.2400 -112.2700      18.6        42       144        60
OIR    2025250     91400   17.2400 -112.2800      18.6        41       140        60
OIR    2025250     91400   17.2400 -112.2900      18.7        41       136        60
OIR    2025250     91400   17.2400 -112.3000      18.8        41       135        60
OIR    2025250     91400   17.2400 -112.3100      18.8        41       135        60
OIR    2025250     91400   17.2400 -112.3200      18.9        41       135        60
OIR    2025250     91400   17.2400 -112.3300      18.9        41       134        60
OIR    2025250     91400   17.2400 -112.3400      19.0        41       134        60
OIR    2025250     91400   17.2400 -112.3500      19.0        41       135        60
OIR    2025250     91400   17.2400 -112.3600      19.0        41       136        60
OIR    2025250     91400   17.2400 -112.3700      19.1        41       136        60
OIR    2025250     91400   17.2400 -112.3800      19.1        41       136        60
OIR    2025250     91400   17.2400 -112.3900      19.1        40       137        60
OIR    2025250     91400   17.2400 -112.4000      19.1        40       138        60
OIR    2025250     91400   17.2400 -112.4100      19.2        40       138        60
OIR    2025250     91400   17.2400 -112.4200      19.2        40       137        60
OIR    2025250     91400   17.2400 -112.4300      19.2        40       136        60
OIR    2025250     91400   17.2400 -112.4400      19.2        40       138        60
OIR    2025250     91400   17.2400 -112.4500      19.2        40       140        60
OIR    2025250     91400   17.2400 -112.4600      19.2        40       142        60
OIR    2025250     91400   17.2400 -112.4700      19.3        40       144        60
OIR    2025250     91400   17.2400 -112.4800      19.3        40       144        60
OIR    2025250     91400   17.2400 -112.4900      19.3        40       142        60
OIR    2025250     91400   17.2400 -112.5000      19.3        40       141        60
OIR    2025250     91400   17.2400 -112.5100      19.3        40       142        60
OIR    2025250     91400   17.2400 -112.5200      19.3        40       143        60
OIR    2025250     91400   17.2400 -112.5300      19.3        40       143        60
OIR    2025250     91400   17.2400 -112.5400      19.3        40       144        60
OIR    2025250     91400   17.2400 -112.5500      19.4        40       144        60
OIR    2025250     91400   17.2400 -112.5600      19.4        40       143        60
OIR    2025250     91400   17.2400 -112.5700      19.4        40       143        60
OIR    2025250     91400   17.2300 -111.4000      15.1        53       144        60
OIR    2025250     91400   17.2300 -111.4100      15.7        51       141        60
OIR    2025250     91400   17.2300 -111.4200      16.5        48       140        60
OIR    2025250     91400   17.2300 -111.4300      17.3        44       138        60
OIR    2025250     91400   17.2300 -111.4400      17.7        44       132        60
OIR    2025250     91400   17.2300 -111.4500      17.8        43       126        60
OIR    2025250     91400   17.2300 -111.4600      17.8        43       123        60
OIR    2025250     91400   17.2300 -111.4700      17.8        43       124        60
OIR    2025250     91400   17.2300 -111.4800      17.8        43       124        60
OIR    2025250     91400   17.2300 -111.4900      17.8        43       128        60
OIR    2025250     91400   17.2300 -111.5000      17.8        43       132        60
OIR    2025250     91400   17.2300 -111.5100      17.7        43       130        60
OIR    2025250     91400   17.2300 -111.5200      17.7        43       129        60
OIR    2025250     91400   17.2300 -111.5300      17.7        43       127        60
OIR    2025250     91400   17.2300 -111.5400      17.7        43       126        60
OIR    2025250     91400   17.2300 -111.5500      17.7        43       125        60
OIR    2025250     91400   17.2300 -111.5600      17.7        43       124        60
OIR    2025250     91400   17.2300 -111.5700      17.7        43       123        60
OIR    2025250     91400   17.2300 -111.5800      17.6        43       121        60
OIR    2025250     91400   17.2300 -111.5900      17.6        43       117        60
OIR    2025250     91400   17.2300 -111.6000      17.5        43       116        60
OIR    2025250     91400   17.2300 -111.6100      17.5        43       114        60
OIR    2025250     91400   17.2300 -111.6200      17.4        44       113        60
OIR    2025250     91400   17.2300 -111.6300      17.3        44       112        60
OIR    2025250     91400   17.2300 -111.6400      17.2        44       111        60
OIR    2025250     91400   17.2300 -111.6500      17.2        44       110        60
OIR    2025250     91400   17.2300 -111.6600      17.2        44       108        60
OIR    2025250     91400   17.2300 -111.6700      17.2        44       107        60
OIR    2025250     91400   17.2300 -111.6800      17.1        44       108        60
OIR    2025250     91400   17.2300 -111.6900      17.0        45       109        60
OIR    2025250     91400   17.2300 -111.7000      16.9        46       108        60
OIR    2025250     91400   17.2300 -111.7100      16.8        47       108        60
OIR    2025250     91400   17.2300 -111.7200      16.8        47       107        60
OIR    2025250     91400   17.2300 -111.7300      16.8        47       104        60
OIR    2025250     91400   17.2300 -111.7400      16.8        47       105        60
OIR    2025250     91400   17.2300 -111.7500      16.8        47       109        60
OIR    2025250     91400   17.2300 -111.7600      16.8        47       112        60
OIR    2025250     91400   17.2300 -111.7700      16.8        47       113        60
OIR    2025250     91400   17.2300 -111.7800      16.7        47       114        60
OIR    2025250     91400   17.2300 -111.7900      16.7        47       114        60
OIR    2025250     91400   17.2300 -111.8000      16.7        47       114        60
OIR    2025250     91400   17.2300 -111.8100      16.7        47       114        60
OIR    2025250     91400   17.2300 -111.8200      16.7        47       114        60
OIR    2025250     91400   17.2300 -111.8300      16.7        47       114        60
OIR    2025250     91400   17.2300 -111.8400      16.7        47       115        60
OIR    2025250     91400   17.2300 -111.8500      16.7        47       115        60
OIR    2025250     91400   17.2300 -111.8600      16.7        47       115        60
OIR    2025250     91400   17.2300 -111.8700      16.8        47       114        60
OIR    2025250     91400   17.2300 -111.8800      16.8        47       114        60
OIR    2025250     91400   17.2300 -111.8900      16.8        47       114        60
OIR    2025250     91400   17.2300 -111.9000      16.8        48       114        60
OIR    2025250     91400   17.2300 -111.9100      16.8        48       117        60
OIR    2025250     91400   17.2300 -111.9200      16.8        48       122        60
OIR    2025250     91400   17.2300 -111.9300      16.9        48       124        60
OIR    2025250     91400   17.2300 -111.9400      16.9        48       126        60
OIR    2025250     91400   17.2300 -111.9500      16.9        47       128        60
OIR    2025250     91400   17.2300 -111.9600      16.9        47       129        60
OIR    2025250     91400   17.2300 -111.9700      16.9        47       131        60
OIR    2025250     91400   17.2300 -111.9800      16.9        47       130        60
OIR    2025250     91400   17.2300 -111.9900      17.0        47       129        60
OIR    2025250     91400   17.2300 -112.0000      17.0        47       131        60
OIR    2025250     91400   17.2300 -112.0100      17.0        47       133        60
OIR    2025250     91400   17.2300 -112.0200      17.1        47       134        60
OIR    2025250     91400   17.2300 -112.0300      17.2        47       135        60
OIR    2025250     91400   17.2300 -112.0400      17.2        47       136        60
OIR    2025250     91400   17.2300 -112.0500      17.3        46       136        60
OIR    2025250     91400   17.2300 -112.0600      17.4        46       136        60
OIR    2025250     91400   17.2300 -112.0700      17.4        46       136        60
OIR    2025250     91400   17.2300 -112.0800      17.5        46       137        60
OIR    2025250     91400   17.2300 -112.0900      17.5        45       137        60
OIR    2025250     91400   17.2300 -112.1000      17.5        45       135        60
OIR    2025250     91400   17.2300 -112.1100      17.5        45       136        60
OIR    2025250     91400   17.2300 -112.1200      17.6        45       139        60
OIR    2025250     91400   17.2300 -112.1300      17.6        45       142        60
OIR    2025250     91400   17.2300 -112.1400      17.7        45       141        60
OIR    2025250     91400   17.2300 -112.1500      17.7        44       139        60
OIR    2025250     91400   17.2300 -112.1600      17.8        44       139        60
OIR    2025250     91400   17.2300 -112.1700      17.8        44       141        60
OIR    2025250     91400   17.2300 -112.1800      17.9        44       142        60
OIR    2025250     91400   17.2300 -112.1900      18.0        43       141        60
OIR    2025250     91400   17.2300 -112.2000      18.1        43       141        60
OIR    2025250     91400   17.2300 -112.2100      18.3        43       142        60
OIR    2025250     91400   17.2300 -112.2200      18.4        42       143        60
OIR    2025250     91400   17.2300 -112.2300      18.4        42       144        60
OIR    2025250     91400   17.2300 -112.2400      18.5        42       144        60
OIR    2025250     91400   17.2300 -112.2800      18.7        41       143        60
OIR    2025250     91400   17.2300 -112.2900      18.8        41       140        60
OIR    2025250     91400   17.2300 -112.3000      18.8        41       138        60
OIR    2025250     91400   17.2300 -112.3100      18.9        41       136        60
OIR    2025250     91400   17.2300 -112.3200      18.9        41       135        60
OIR    2025250     91400   17.2300 -112.3300      19.0        41       135        60
OIR    2025250     91400   17.2300 -112.3400      19.0        41       134        60
OIR    2025250     91400   17.2300 -112.3500      19.0        41       135        60
OIR    2025250     91400   17.2300 -112.3600      19.0        41       135        60
OIR    2025250     91400   17.2300 -112.3700      19.1        41       136        60
OIR    2025250     91400   17.2300 -112.3800      19.1        41       137        60
OIR    2025250     91400   17.2300 -112.3900      19.1        41       138        60
OIR    2025250     91400   17.2300 -112.4000      19.1        41       139        60
OIR    2025250     91400   17.2300 -112.4100      19.2        40       139        60
OIR    2025250     91400   17.2300 -112.4200      19.2        40       137        60
OIR    2025250     91400   17.2300 -112.4300      19.2        40       136        60
OIR    2025250     91400   17.2300 -112.4400      19.2        40       138        60
OIR    2025250     91400   17.2300 -112.4500      19.2        40       141        60
OIR    2025250     91400   17.2300 -112.4600      19.2        40       143        60
OIR    2025250     91400   17.2300 -112.4700      19.3        40       144        60
OIR    2025250     91400   17.2300 -112.4800      19.3        40       144        60
OIR    2025250     91400   17.2300 -112.4900      19.3        40       142        60
OIR    2025250     91400   17.2300 -112.5000      19.3        40       140        60
OIR    2025250     91400   17.2300 -112.5100      19.3        40       142        60
OIR    2025250     91400   17.2300 -112.5200      19.3        40       144        60
OIR    2025250     91400   17.2300 -112.5300      19.3        40       144        60
OIR    2025250     91400   17.2300 -112.5400      19.4        40       144        60
OIR    2025250     91400   17.2300 -112.5500      19.4        40       144        60
OIR    2025250     91400   17.2300 -112.5600      19.4        40       144        60
OIR    2025250     91400   17.2200 -111.3800      14.5        54       144        60
OIR    2025250     91400   17.2200 -111.3900      15.1        51       141        60
OIR    2025250     91400   17.2200 -111.4000      15.7        49       138        60
OIR    2025250     91400   17.2200 -111.4100      16.5        47       135        60
OIR    2025250     91400   17.2200 -111.4200      17.2        45       134        60
OIR    2025250     91400   17.2200 -111.4300      17.7        43       132        60
OIR    2025250     91400   17.2200 -111.4400      17.9        43       127        60
OIR    2025250     91400   17.2200 -111.4500      17.9        43       121        60
OIR    2025250     91400   17.2200 -111.4600      17.9        43       117        60
OIR    2025250     91400   17.2200 -111.4700      17.9        43       119        60
OIR    2025250     91400   17.2200 -111.4800      17.9        43       120        60
OIR    2025250     91400   17.2200 -111.4900      17.8        43       123        60
OIR    2025250     91400   17.2200 -111.5000      17.8        43       127        60
OIR    2025250     91400   17.2200 -111.5100      17.8        43       128        60
OIR    2025250     91400   17.2200 -111.5200      17.8        43       125        60
OIR    2025250     91400   17.2200 -111.5300      17.7        43       122        60
OIR    2025250     91400   17.2200 -111.5400      17.7        43       120        60
OIR    2025250     91400   17.2200 -111.5500      17.7        43       119        60
OIR    2025250     91400   17.2200 -111.5600      17.7        43       116        60
OIR    2025250     91400   17.2200 -111.5700      17.7        43       116        60
OIR    2025250     91400   17.2200 -111.5800      17.7        43       116        60
OIR    2025250     91400   17.2200 -111.5900      17.6        43       116        60
OIR    2025250     91400   17.2200 -111.6000      17.6        43       115        60
OIR    2025250     91400   17.2200 -111.6100      17.5        43       115        60
OIR    2025250     91400   17.2200 -111.6200      17.4        44       114        60
OIR    2025250     91400   17.2200 -111.6300      17.3        44       112        60
OIR    2025250     91400   17.2200 -111.6400      17.3        44       111        60
OIR    2025250     91400   17.2200 -111.6500      17.2        44       108        60
OIR    2025250     91400   17.2200 -111.6600      17.2        44       105        60
OIR    2025250     91400   17.2200 -111.6700      17.2        44       104        60
OIR    2025250     91400   17.2200 -111.6800      17.1        45       105        60
OIR    2025250     91400   17.2200 -111.6900      17.0        46       107        60
OIR    2025250     91400   17.2200 -111.7000      16.9        47       107        60
OIR    2025250     91400   17.2200 -111.7100      16.8        47       107        60
OIR    2025250     91400   17.2200 -111.7200      16.8        47       107        60
OIR    2025250     91400   17.2200 -111.7300      16.8        47       107        60
OIR    2025250     91400   17.2200 -111.7400      16.8        47       108        60
OIR    2025250     91400   17.2200 -111.7500      16.8        47       111        60
OIR    2025250     91400   17.2200 -111.7600      16.8        47       114        60
OIR    2025250     91400   17.2200 -111.7700      16.8        47       115        60
OIR    2025250     91400   17.2200 -111.7800      16.8        47       115        60
OIR    2025250     91400   17.2200 -111.7900      16.7        47       115        60
OIR    2025250     91400   17.2200 -111.8000      16.7        47       116        60
OIR    2025250     91400   17.2200 -111.8100      16.7        47       117        60
OIR    2025250     91400   17.2200 -111.8200      16.7        47       116        60
OIR    2025250     91400   17.2200 -111.8300      16.7        47       116        60
OIR    2025250     91400   17.2200 -111.8400      16.7        47       115        60
OIR    2025250     91400   17.2200 -111.8500      16.7        47       116        60
OIR    2025250     91400   17.2200 -111.8600      16.8        47       115        60
OIR    2025250     91400   17.2200 -111.8700      16.8        47       115        60
OIR    2025250     91400   17.2200 -111.8800      16.8        47       114        60
OIR    2025250     91400   17.2200 -111.8900      16.8        47       113        60
OIR    2025250     91400   17.2200 -111.9000      16.8        47       113        60
OIR    2025250     91400   17.2200 -111.9100      16.8        47       115        60
OIR    2025250     91400   17.2200 -111.9200      16.9        48       117        60
OIR    2025250     91400   17.2200 -111.9300      16.9        48       121        60
OIR    2025250     91400   17.2200 -111.9400      16.9        47       125        60
OIR    2025250     91400   17.2200 -111.9500      16.9        47       128        60
OIR    2025250     91400   17.2200 -111.9600      16.9        47       129        60
OIR    2025250     91400   17.2200 -111.9700      17.0        47       130        60
OIR    2025250     91400   17.2200 -111.9800      17.0        47       130        60
OIR    2025250     91400   17.2200 -111.9900      17.0        47       130        60
OIR    2025250     91400   17.2200 -112.0000      17.1        47       130        60
OIR    2025250     91400   17.2200 -112.0100      17.1        47       132        60
OIR    2025250     91400   17.2200 -112.0200      17.2        47       133        60
OIR    2025250     91400   17.2200 -112.0300      17.2        47       135        60
OIR    2025250     91400   17.2200 -112.0400      17.3        47       136        60
OIR    2025250     91400   17.2200 -112.0500      17.3        46       135        60
OIR    2025250     91400   17.2200 -112.0600      17.4        46       135        60
OIR    2025250     91400   17.2200 -112.0700      17.5        46       135        60
OIR    2025250     91400   17.2200 -112.0800      17.5        46       136        60
OIR    2025250     91400   17.2200 -112.0900      17.5        46       137        60
OIR    2025250     91400   17.2200 -112.1000      17.6        45       135        60
OIR    2025250     91400   17.2200 -112.1100      17.6        45       134        60
OIR    2025250     91400   17.2200 -112.1200      17.6        45       137        60
OIR    2025250     91400   17.2200 -112.1300      17.6        45       141        60
OIR    2025250     91400   17.2200 -112.1400      17.7        45       140        60
OIR    2025250     91400   17.2200 -112.1500      17.7        45       139        60
OIR    2025250     91400   17.2200 -112.1600      17.8        44       139        60
OIR    2025250     91400   17.2200 -112.1700      17.8        44       140        60
OIR    2025250     91400   17.2200 -112.1800      17.9        44       141        60
OIR    2025250     91400   17.2200 -112.1900      18.0        43       140        60
OIR    2025250     91400   17.2200 -112.2000      18.1        43       138        60
OIR    2025250     91400   17.2200 -112.2100      18.3        43       140        60
OIR    2025250     91400   17.2200 -112.2200      18.4        42       143        60
OIR    2025250     91400   17.2200 -112.2300      18.5        42       144        60
OIR    2025250     91400   17.2200 -112.2400      18.5        42       143        60
OIR    2025250     91400   17.2200 -112.2500      18.5        42       142        60
OIR    2025250     91400   17.2200 -112.2600      18.6        42       143        60
OIR    2025250     91400   17.2200 -112.2700      18.6        42       144        60
OIR    2025250     91400   17.2200 -112.2800      18.7        41       144        60
OIR    2025250     91400   17.2200 -112.2900      18.8        41       143        60
OIR    2025250     91400   17.2200 -112.3000      18.8        41       141        60
OIR    2025250     91400   17.2200 -112.3100      18.9        41       138        60
OIR    2025250     91400   17.2200 -112.3200      18.9        41       136        60
OIR    2025250     91400   17.2200 -112.3300      19.0        41       135        60
OIR    2025250     91400   17.2200 -112.3400      19.0        41       135        60
OIR    2025250     91400   17.2200 -112.3500      19.0        41       134        60
OIR    2025250     91400   17.2200 -112.3600      19.1        41       134        60
OIR    2025250     91400   17.2200 -112.3700      19.1        41       135        60
OIR    2025250     91400   17.2200 -112.3800      19.1        41       137        60
OIR    2025250     91400   17.2200 -112.3900      19.1        41       139        60
OIR    2025250     91400   17.2200 -112.4000      19.2        41       139        60
OIR    2025250     91400   17.2200 -112.4100      19.2        41       140        60
OIR    2025250     91400   17.2200 -112.4200      19.2        41       140        60
OIR    2025250     91400   17.2200 -112.4300      19.2        41       139        60
OIR    2025250     91400   17.2200 -112.4400      19.2        40       141        60
OIR    2025250     91400   17.2200 -112.4500      19.3        40       143        60
OIR    2025250     91400   17.2200 -112.4600      19.3        40       144        60
OIR    2025250     91400   17.2200 -112.4700      19.3        40       143        60
OIR    2025250     91400   17.2200 -112.4800      19.3        40       142        60
OIR    2025250     91400   17.2200 -112.4900      19.3        40       143        60
OIR    2025250     91400   17.2200 -112.5000      19.3        40       143        60
OIR    2025250     91400   17.2200 -112.5100      19.3        40       143        60
OIR    2025250     91400   17.2200 -112.5200      19.3        40       144        60
OIR    2025250     91400   17.2200 -112.5300      19.3        40       144        60
OIR    2025250     91400   17.2200 -112.5400      19.4        40       143        60
OIR    2025250     91400   17.2200 -112.5500      19.4        40       143        60
OIR    2025250     91400   17.2200 -112.5600      19.4        40       143        60
OIR    2025250     91400   17.2200 -112.5700      19.4        40       144        60
OIR    2025250     91400   17.2200 -112.6400      19.6        41       143        60
OIR    2025250     91400   17.2100 -111.3700      14.3        55       145        60
OIR    2025250     91400   17.2100 -111.3800      14.9        53       140        60
OIR    2025250     91400   17.2100 -111.3900      15.8        48       135        60
OIR    2025250     91400   17.2100 -111.4000      16.4        47       132        60
OIR    2025250     91400   17.2100 -111.4100      17.0        45       129        60
OIR    2025250     91400   17.2100 -111.4200      17.6        43       126        60
OIR    2025250     91400   17.2100 -111.4300      17.8        43       124        60
OIR    2025250     91400   17.2100 -111.4400      18.0        43       122        60
OIR    2025250     91400   17.2100 -111.4500      18.0        43       120        60
OIR    2025250     91400   17.2100 -111.4600      18.0        43       119        60
OIR    2025250     91400   17.2100 -111.4700      17.9        43       122        60
OIR    2025250     91400   17.2100 -111.4800      17.9        43       124        60
OIR    2025250     91400   17.2100 -111.4900      17.9        43       124        60
OIR    2025250     91400   17.2100 -111.5000      17.8        43       122        60
OIR    2025250     91400   17.2100 -111.5100      17.8        43       120        60
OIR    2025250     91400   17.2100 -111.5200      17.8        43       119        60
OIR    2025250     91400   17.2100 -111.5300      17.8        43       117        60
OIR    2025250     91400   17.2100 -111.5400      17.7        43       116        60
OIR    2025250     91400   17.2100 -111.5500      17.7        43       114        60
OIR    2025250     91400   17.2100 -111.5600      17.7        43       114        60
OIR    2025250     91400   17.2100 -111.5700      17.7        43       114        60
OIR    2025250     91400   17.2100 -111.5800      17.7        43       114        60
OIR    2025250     91400   17.2100 -111.5900      17.7        43       114        60
OIR    2025250     91400   17.2100 -111.6000      17.6        43       114        60
OIR    2025250     91400   17.2100 -111.6100      17.5        44       113        60
OIR    2025250     91400   17.2100 -111.6200      17.4        44       112        60
OIR    2025250     91400   17.2100 -111.6300      17.3        44       110        60
OIR    2025250     91400   17.2100 -111.6400      17.3        44       108        60
OIR    2025250     91400   17.2100 -111.6500      17.2        44       107        60
OIR    2025250     91400   17.2100 -111.6600      17.2        44       104        60
OIR    2025250     91400   17.2100 -111.6700      17.2        45       104        60
OIR    2025250     91400   17.2100 -111.6800      17.1        46       104        60
OIR    2025250     91400   17.2100 -111.6900      16.9        47       107        60
OIR    2025250     91400   17.2100 -111.7000      16.9        47       107        60
OIR    2025250     91400   17.2100 -111.7100      16.9        47       108        60
OIR    2025250     91400   17.2100 -111.7200      16.8        47       108        60
OIR    2025250     91400   17.2100 -111.7300      16.8        47       109        60
OIR    2025250     91400   17.2100 -111.7400      16.8        47       110        60
OIR    2025250     91400   17.2100 -111.7500      16.8        47       114        60
OIR    2025250     91400   17.2100 -111.7600      16.8        47       117        60
OIR    2025250     91400   17.2100 -111.7700      16.8        47       119        60
OIR    2025250     91400   17.2100 -111.7800      16.8        47       117        60
OIR    2025250     91400   17.2100 -111.7900      16.8        47       117        60
OIR    2025250     91400   17.2100 -111.8000      16.8        47       119        60
OIR    2025250     91400   17.2100 -111.8100      16.7        47       121        60
OIR    2025250     91400   17.2100 -111.8200      16.7        47       119        60
OIR    2025250     91400   17.2100 -111.8300      16.7        47       116        60
OIR    2025250     91400   17.2100 -111.8400      16.7        47       116        60
OIR    2025250     91400   17.2100 -111.8500      16.8        47       116        60
OIR    2025250     91400   17.2100 -111.8600      16.8        47       115        60
OIR    2025250     91400   17.2100 -111.8700      16.8        47       115        60
OIR    2025250     91400   17.2100 -111.8800      16.8        47       114        60
OIR    2025250     91400   17.2100 -111.8900      16.8        47       113        60
OIR    2025250     91400   17.2100 -111.9000      16.8        47       112        60
OIR    2025250     91400   17.2100 -111.9100      16.9        47       113        60
OIR    2025250     91400   17.2100 -111.9200      16.9        47       115        60
OIR    2025250     91400   17.2100 -111.9300      16.9        47       117        60
OIR    2025250     91400   17.2100 -111.9400      16.9        47       123        60
OIR    2025250     91400   17.2100 -111.9500      16.9        47       128        60
OIR    2025250     91400   17.2100 -111.9600      17.0        47       129        60
OIR    2025250     91400   17.2100 -111.9700      17.0        47       129        60
OIR    2025250     91400   17.2100 -111.9800      17.0        47       130        60
OIR    2025250     91400   17.2100 -111.9900      17.1        47       131        60
OIR    2025250     91400   17.2100 -112.0000      17.1        47       131        60
OIR    2025250     91400   17.2100 -112.0100      17.2        47       131        60
OIR    2025250     91400   17.2100 -112.0200      17.2        47       132        60
OIR    2025250     91400   17.2100 -112.0300      17.2        47       133        60
OIR    2025250     91400   17.2100 -112.0400      17.3        47       135        60
OIR    2025250     91400   17.2100 -112.0500      17.4        46       135        60
OIR    2025250     91400   17.2100 -112.0600      17.5        46       134        60
OIR    2025250     91400   17.2100 -112.0700      17.5        46       134        60
OIR    2025250     91400   17.2100 -112.0800      17.5        46       136        60
OIR    2025250     91400   17.2100 -112.0900      17.5        46       138        60
OIR    2025250     91400   17.2100 -112.1000      17.6        45       137        60
OIR    2025250     91400   17.2100 -112.1100      17.6        45       135        60
OIR    2025250     91400   17.2100 -112.1200      17.6        45       137        60
OIR    2025250     91400   17.2100 -112.1300      17.7        45       139        60
OIR    2025250     91400   17.2100 -112.1400      17.7        45       140        60
OIR    2025250     91400   17.2100 -112.1500      17.8        45       140        60
OIR    2025250     91400   17.2100 -112.1600      17.8        44       140        60
OIR    2025250     91400   17.2100 -112.1700      17.9        44       139        60
OIR    2025250     91400   17.2100 -112.1800      17.9        44       138        60
OIR    2025250     91400   17.2100 -112.1900      18.1        43       137        60
OIR    2025250     91400   17.2100 -112.2000      18.2        43       137        60
OIR    2025250     91400   17.2100 -112.2100      18.4        43       139        60
OIR    2025250     91400   17.2100 -112.2200      18.4        42       143        60
OIR    2025250     91400   17.2100 -112.2400      18.5        42       144        60
OIR    2025250     91400   17.2100 -112.2500      18.6        42       142        60
OIR    2025250     91400   17.2100 -112.2600      18.6        42       143        60
OIR    2025250     91400   17.2100 -112.2700      18.7        42       144        60
OIR    2025250     91400   17.2100 -112.2800      18.8        41       144        60
OIR    2025250     91400   17.2100 -112.2900      18.8        41       143        60
OIR    2025250     91400   17.2100 -112.3000      18.9        41       142        60
OIR    2025250     91400   17.2100 -112.3100      18.9        41       139        60
OIR    2025250     91400   17.2100 -112.3200      19.0        41       136        60
OIR    2025250     91400   17.2100 -112.3300      19.0        41       136        60
OIR    2025250     91400   17.2100 -112.3400      19.0        41       135        60
OIR    2025250     91400   17.2100 -112.3500      19.0        41       135        60
OIR    2025250     91400   17.2100 -112.3600      19.1        41       135        60
OIR    2025250     91400   17.2100 -112.3700      19.1        41       135        60
OIR    2025250     91400   17.2100 -112.3800      19.1        41       136        60
OIR    2025250     91400   17.2100 -112.3900      19.1        41       138        60
OIR    2025250     91400   17.2100 -112.4000      19.2        41       139        60
OIR    2025250     91400   17.2100 -112.4100      19.2        41       140        60
OIR    2025250     91400   17.2100 -112.4200      19.2        41       140        60
OIR    2025250     91400   17.2100 -112.4300      19.2        41       139        60
OIR    2025250     91400   17.2100 -112.4400      19.3        41       140        60
OIR    2025250     91400   17.2100 -112.4500      19.3        41       142        60
OIR    2025250     91400   17.2100 -112.4600      19.3        40       143        60
OIR    2025250     91400   17.2100 -112.4700      19.3        40       142        60
OIR    2025250     91400   17.2100 -112.4800      19.3        40       141        60
OIR    2025250     91400   17.2100 -112.4900      19.3        40       142        60
OIR    2025250     91400   17.2100 -112.5000      19.3        40       143        60
OIR    2025250     91400   17.2100 -112.5100      19.3        40       144        60
OIR    2025250     91400   17.2100 -112.5200      19.3        40       144        60
OIR    2025250     91400   17.2100 -112.5300      19.4        40       144        60
OIR    2025250     91400   17.2100 -112.5400      19.4        40       143        60
OIR    2025250     91400   17.2100 -112.5500      19.4        40       141        60
OIR    2025250     91400   17.2100 -112.5600      19.4        40       142        60
OIR    2025250     91400   17.2100 -112.5700      19.4        40       143        60
OIR    2025250     91400   17.2100 -112.6300      19.6        41       144        60
OIR    2025250     91400   17.2100 -112.6400      19.6        41       141        60
OIR    2025250     91400   17.2000 -111.3700      14.6        54       144        60
OIR    2025250     91400   17.2000 -111.3800      15.6        50       138        60
OIR    2025250     91400   17.2000 -111.3900      16.5        47       132        60
OIR    2025250     91400   17.2000 -111.4000      17.1        45       129        60
OIR    2025250     91400   17.2000 -111.4100      17.6        43       126        60
OIR    2025250     91400   17.2000 -111.4200      17.9        43       124        60
OIR    2025250     91400   17.2000 -111.4300      18.1        42       123        60
OIR    2025250     91400   17.2000 -111.4400      18.2        42       122        60
OIR    2025250     91400   17.2000 -111.4500      18.2        42       120        60
OIR    2025250     91400   17.2000 -111.4600      18.2        42       119        60
OIR    2025250     91400   17.2000 -111.4700      18.2        42       122        60
OIR    2025250     91400   17.2000 -111.4800      18.0        43       126        60
OIR    2025250     91400   17.2000 -111.4900      18.0        43       127        60
OIR    2025250     91400   17.2000 -111.5000      17.9        43       121        60
OIR    2025250     91400   17.2000 -111.5100      17.9        43       114        60
OIR    2025250     91400   17.2000 -111.5200      17.8        43       115        60
OIR    2025250     91400   17.2000 -111.5300      17.8        43       115        60
OIR    2025250     91400   17.2000 -111.5400      17.8        43       113        60
OIR    2025250     91400   17.2000 -111.5500      17.8        43       111        60
OIR    2025250     91400   17.2000 -111.5600      17.8        43       111        60
OIR    2025250     91400   17.2000 -111.5700      17.7        43       112        60
OIR    2025250     91400   17.2000 -111.5800      17.7        43       112        60
OIR    2025250     91400   17.2000 -111.5900      17.7        43       113        60
OIR    2025250     91400   17.2000 -111.6000      17.6        43       113        60
OIR    2025250     91400   17.2000 -111.6100      17.6        44       112        60
OIR    2025250     91400   17.2000 -111.6200      17.5        44       110        60
OIR    2025250     91400   17.2000 -111.6300      17.4        44       108        60
OIR    2025250     91400   17.2000 -111.6400      17.3        44       105        60
OIR    2025250     91400   17.2000 -111.6500      17.3        44       104        60
OIR    2025250     91400   17.2000 -111.6600      17.2        45       104        60
OIR    2025250     91400   17.2000 -111.6700      17.1        45       104        60
OIR    2025250     91400   17.2000 -111.6800      17.0        46       104        60
OIR    2025250     91400   17.2000 -111.6900      16.9        47       105        60
OIR    2025250     91400   17.2000 -111.7000      16.9        47       108        60
OIR    2025250     91400   17.2000 -111.7100      16.9        47       109        60
OIR    2025250     91400   17.2000 -111.7200      16.9        47       111        60
OIR    2025250     91400   17.2000 -111.7300      16.8        47       112        60
OIR    2025250     91400   17.2000 -111.7400      16.8        47       112        60
OIR    2025250     91400   17.2000 -111.7500      16.8        47       116        60
OIR    2025250     91400   17.2000 -111.7600      16.8        47       122        60
OIR    2025250     91400   17.2000 -111.7700      16.8        47       125        60
OIR    2025250     91400   17.2000 -111.7800      16.8        47       124        60
OIR    2025250     91400   17.2000 -111.7900      16.8        47       124        60
OIR    2025250     91400   17.2000 -111.8000      16.8        47       123        60
OIR    2025250     91400   17.2000 -111.8100      16.8        47       122        60
OIR    2025250     91400   17.2000 -111.8200      16.8        47       120        60
OIR    2025250     91400   17.2000 -111.8300      16.8        47       117        60
OIR    2025250     91400   17.2000 -111.8400      16.8        47       116        60
OIR    2025250     91400   17.2000 -111.8500      16.8        47       115        60
OIR    2025250     91400   17.2000 -111.8600      16.8        47       114        60
OIR    2025250     91400   17.2000 -111.8700      16.8        47       114        60
OIR    2025250     91400   17.2000 -111.8800      16.8        47       115        60
OIR    2025250     91400   17.2000 -111.8900      16.8        47       114        60
OIR    2025250     91400   17.2000 -111.9000      16.8        47       114        60
OIR    2025250     91400   17.2000 -111.9100      16.9        47       115        60
OIR    2025250     91400   17.2000 -111.9200      16.9        47       116        60
OIR    2025250     91400   17.2000 -111.9300      16.9        47       119        60
OIR    2025250     91400   17.2000 -111.9400      16.9        47       123        60
OIR    2025250     91400   17.2000 -111.9500      17.0        47       128        60
OIR    2025250     91400   17.2000 -111.9600      17.0        47       129        60
OIR    2025250     91400   17.2000 -111.9700      17.0        47       129        60
OIR    2025250     91400   17.2000 -111.9800      17.1        47       130        60
OIR    2025250     91400   17.2000 -111.9900      17.1        47       131        60
OIR    2025250     91400   17.2000 -112.0000      17.2        47       132        60
OIR    2025250     91400   17.2000 -112.0100      17.2        47       132        60
OIR    2025250     91400   17.2000 -112.0200      17.2        47       132        60
OIR    2025250     91400   17.2000 -112.0300      17.3        47       133        60
OIR    2025250     91400   17.2000 -112.0400      17.4        46       134        60
OIR    2025250     91400   17.2000 -112.0500      17.4        46       134        60
OIR    2025250     91400   17.2000 -112.0600      17.5        46       133        60
OIR    2025250     91400   17.2000 -112.0700      17.5        46       133        60
OIR    2025250     91400   17.2000 -112.0800      17.5        46       136        60
OIR    2025250     91400   17.2000 -112.0900      17.6        46       139        60
OIR    2025250     91400   17.2000 -112.1000      17.6        45       138        60
OIR    2025250     91400   17.2000 -112.1100      17.6        45       136        60
OIR    2025250     91400   17.2000 -112.1200      17.7        45       136        60
OIR    2025250     91400   17.2000 -112.1300      17.7        45       138        60
OIR    2025250     91400   17.2000 -112.1400      17.7        45       140        60
OIR    2025250     91400   17.2000 -112.1500      17.8        45       140        60
OIR    2025250     91400   17.2000 -112.1600      17.8        44       139        60
OIR    2025250     91400   17.2000 -112.1700      17.9        44       138        60
OIR    2025250     91400   17.2000 -112.1800      18.0        44       136        60
OIR    2025250     91400   17.2000 -112.1900      18.1        43       136        60
OIR    2025250     91400   17.2000 -112.2000      18.3        43       137        60
OIR    2025250     91400   17.2000 -112.2100      18.4        42       139        60
OIR    2025250     91400   17.2000 -112.2200      18.5        42       143        60
OIR    2025250     91400   17.2000 -112.2500      18.6        42       143        60
OIR    2025250     91400   17.2000 -112.2600      18.7        42       143        60
OIR    2025250     91400   17.2000 -112.2700      18.7        42       144        60
OIR    2025250     91400   17.2000 -112.2800      18.8        41       144        60
OIR    2025250     91400   17.2000 -112.2900      18.9        41       143        60
OIR    2025250     91400   17.2000 -112.3000      18.9        41       143        60
OIR    2025250     91400   17.2000 -112.3100      18.9        41       140        60
OIR    2025250     91400   17.2000 -112.3200      19.0        41       138        60
OIR    2025250     91400   17.2000 -112.3300      19.0        41       137        60
OIR    2025250     91400   17.2000 -112.3400      19.0        41       136        60
OIR    2025250     91400   17.2000 -112.3500      19.0        41       136        60
OIR    2025250     91400   17.2000 -112.3600      19.1        41       136        60
OIR    2025250     91400   17.2000 -112.3700      19.1        41       137        60
OIR    2025250     91400   17.2000 -112.3800      19.1        41       136        60
OIR    2025250     91400   17.2000 -112.3900      19.2        41       136        60
OIR    2025250     91400   17.2000 -112.4000      19.2        41       137        60
OIR    2025250     91400   17.2000 -112.4100      19.2        41       139        60
OIR    2025250     91400   17.2000 -112.4200      19.2        41       139        60
OIR    2025250     91400   17.2000 -112.4300      19.2        41       138        60
OIR    2025250     91400   17.2000 -112.4400      19.3        41       137        60
OIR    2025250     91400   17.2000 -112.4500      19.3        41       139        60
OIR    2025250     91400   17.2000 -112.4600      19.3        41       141        60
OIR    2025250     91400   17.2000 -112.4700      19.3        41       141        60
OIR    2025250     91400   17.2000 -112.4800      19.3        40       141        60
OIR    2025250     91400   17.2000 -112.4900      19.3        40       141        60
OIR    2025250     91400   17.2000 -112.5000      19.3        40       141        60
OIR    2025250     91400   17.2000 -112.5100      19.3        40       141        60
OIR    2025250     91400   17.2000 -112.5200      19.4        40       144        60
OIR    2025250     91400   17.2000 -112.5400      19.4        40       143        60
OIR    2025250     91400   17.2000 -112.5500      19.4        40       140        60
OIR    2025250     91400   17.2000 -112.5600      19.4        41       140        60
OIR    2025250     91400   17.2000 -112.5700      19.4        41       140        60
OIR    2025250     91400   17.2000 -112.5800      19.4        41       141        60
OIR    2025250     91400   17.1900 -111.3700      14.8        53       142        60
OIR    2025250     91400   17.1900 -111.3800      15.9        49       137        60
OIR    2025250     91400   17.1900 -111.3900      17.0        45       132        60
OIR    2025250     91400   17.1900 -111.4000      17.6        43       129        60
OIR    2025250     91400   17.1900 -111.4100      18.0        42       126        60
OIR    2025250     91400   17.1900 -111.4200      18.1        42       126        60
OIR    2025250     91400   17.1900 -111.4300      18.2        42       127        60
OIR    2025250     91400   17.1900 -111.4400      18.2        42       129        60
OIR    2025250     91400   17.1900 -111.4500      18.2        42       124        60
OIR    2025250     91400   17.1900 -111.4600      18.2        42       119        60
OIR    2025250     91400   17.1900 -111.4700      18.2        42       121        60
OIR    2025250     91400   17.1900 -111.4800      18.2        42       126        60
OIR    2025250     91400   17.1900 -111.4900      18.1        42       127        60
OIR    2025250     91400   17.1900 -111.5000      18.1        43       122        60
OIR    2025250     91400   17.1900 -111.5100      18.1        43       116        60
OIR    2025250     91400   17.1900 -111.5200      18.1        43       115        60
OIR    2025250     91400   17.1900 -111.5300      18.0        43       115        60
OIR    2025250     91400   17.1900 -111.5400      18.0        43       114        60
OIR    2025250     91400   17.1900 -111.5500      18.0        43       112        60
OIR    2025250     91400   17.1900 -111.5600      17.9        43       111        60
OIR    2025250     91400   17.1900 -111.5700      17.8        43       112        60
OIR    2025250     91400   17.1900 -111.5800      17.8        43       113        60
OIR    2025250     91400   17.1900 -111.5900      17.7        43       114        60
OIR    2025250     91400   17.1900 -111.6000      17.7        44       114        60
OIR    2025250     91400   17.1900 -111.6100      17.6        44       113        60
OIR    2025250     91400   17.1900 -111.6200      17.5        44       112        60
OIR    2025250     91400   17.1900 -111.6300      17.4        44       111        60
OIR    2025250     91400   17.1900 -111.6400      17.3        44       109        60
OIR    2025250     91400   17.1900 -111.6500      17.3        45       105        60
OIR    2025250     91400   17.1900 -111.6600      17.2        45       105        60
OIR    2025250     91400   17.1900 -111.6700      17.1        45       105        60
OIR    2025250     91400   17.1900 -111.6800      17.0        46       107        60
OIR    2025250     91400   17.1900 -111.6900      16.9        47       108        60
OIR    2025250     91400   17.1900 -111.7000      16.9        47       109        60
OIR    2025250     91400   17.1900 -111.7100      16.9        47       111        60
OIR    2025250     91400   17.1900 -111.7200      16.9        47       114        60
OIR    2025250     91400   17.1900 -111.7300      16.8        47       116        60
OIR    2025250     91400   17.1900 -111.7400      16.8        47       117        60
OIR    2025250     91400   17.1900 -111.7500      16.8        47       121        60
OIR    2025250     91400   17.1900 -111.7600      16.8        47       124        60
OIR    2025250     91400   17.1900 -111.7700      16.8        47       127        60
OIR    2025250     91400   17.1900 -111.7800      16.8        47       127        60
OIR    2025250     91400   17.1900 -111.7900      16.8        47       127        60
OIR    2025250     91400   17.1900 -111.8000      16.8        47       126        60
OIR    2025250     91400   17.1900 -111.8100      16.8        47       124        60
OIR    2025250     91400   17.1900 -111.8200      16.8        47       122        60
OIR    2025250     91400   17.1900 -111.8300      16.8        47       120        60
OIR    2025250     91400   17.1900 -111.8400      16.8        47       116        60
OIR    2025250     91400   17.1900 -111.8500      16.8        47       115        60
OIR    2025250     91400   17.1900 -111.8600      16.8        47       113        60
OIR    2025250     91400   17.1900 -111.8700      16.8        47       114        60
OIR    2025250     91400   17.1900 -111.8800      16.8        47       115        60
OIR    2025250     91400   17.1900 -111.8900      16.8        47       115        60
OIR    2025250     91400   17.1900 -111.9000      16.8        47       116        60
OIR    2025250     91400   17.1900 -111.9100      16.9        47       116        60
OIR    2025250     91400   17.1900 -111.9200      16.9        47       119        60
OIR    2025250     91400   17.1900 -111.9300      16.9        47       121        60
OIR    2025250     91400   17.1900 -111.9400      16.9        47       124        60
OIR    2025250     91400   17.1900 -111.9500      17.0        47       127        60
OIR    2025250     91400   17.1900 -111.9600      17.0        47       129        60
OIR    2025250     91400   17.1900 -111.9700      17.0        47       129        60
OIR    2025250     91400   17.1900 -111.9800      17.1        47       130        60
OIR    2025250     91400   17.1900 -111.9900      17.1        47       132        60
OIR    2025250     91400   17.1900 -112.0000      17.2        47       133        60
OIR    2025250     91400   17.1900 -112.0100      17.2        47       133        60
OIR    2025250     91400   17.1900 -112.0200      17.3        47       133        60
OIR    2025250     91400   17.1900 -112.0300      17.4        47       132        60
OIR    2025250     91400   17.1900 -112.0400      17.4        46       132        60
OIR    2025250     91400   17.1900 -112.0500      17.5        46       132        60
OIR    2025250     91400   17.1900 -112.0600      17.5        46       132        60
OIR    2025250     91400   17.1900 -112.0700      17.5        46       132        60
OIR    2025250     91400   17.1900 -112.0800      17.6        46       136        60
OIR    2025250     91400   17.1900 -112.0900      17.6        46       140        60
OIR    2025250     91400   17.1900 -112.1000      17.6        45       139        60
OIR    2025250     91400   17.1900 -112.1100      17.6        45       137        60
OIR    2025250     91400   17.1900 -112.1200      17.7        45       136        60
OIR    2025250     91400   17.1900 -112.1300      17.7        45       138        60
OIR    2025250     91400   17.1900 -112.1400      17.8        45       140        60
OIR    2025250     91400   17.1900 -112.1500      17.8        45       138        60
OIR    2025250     91400   17.1900 -112.1600      17.9        44       137        60
OIR    2025250     91400   17.1900 -112.1700      17.9        44       137        60
OIR    2025250     91400   17.1900 -112.1800      18.0        44       136        60
OIR    2025250     91400   17.1900 -112.1900      18.2        43       137        60
OIR    2025250     91400   17.1900 -112.2000      18.3        43       138        60
OIR    2025250     91400   17.1900 -112.2100      18.4        43       140        60
OIR    2025250     91400   17.1900 -112.2200      18.5        42       143        60
OIR    2025250     91400   17.1900 -112.2600      18.7        42       144        60
OIR    2025250     91400   17.1900 -112.2700      18.8        42       143        60
OIR    2025250     91400   17.1900 -112.2800      18.8        41       143        60
OIR    2025250     91400   17.1900 -112.2900      18.9        41       143        60
OIR    2025250     91400   17.1900 -112.3000      18.9        41       142        60
OIR    2025250     91400   17.1900 -112.3100      19.0        41       140        60
OIR    2025250     91400   17.1900 -112.3200      19.0        41       138        60
OIR    2025250     91400   17.1900 -112.3300      19.0        41       137        60
OIR    2025250     91400   17.1900 -112.3400      19.0        41       137        60
OIR    2025250     91400   17.1900 -112.3500      19.1        41       136        60
OIR    2025250     91400   17.1900 -112.3600      19.1        41       136        60
OIR    2025250     91400   17.1900 -112.3700      19.1        41       135        60
OIR    2025250     91400   17.1900 -112.3800      19.1        41       136        60
OIR    2025250     91400   17.1900 -112.3900      19.2        41       136        60
OIR    2025250     91400   17.1900 -112.4000      19.2        41       137        60
OIR    2025250     91400   17.1900 -112.4100      19.2        41       138        60
OIR    2025250     91400   17.1900 -112.4200      19.2        41       139        60
OIR    2025250     91400   17.1900 -112.4300      19.3        41       139        60
OIR    2025250     91400   17.1900 -112.4400      19.3        41       139        60
OIR    2025250     91400   17.1900 -112.4500      19.3        41       139        60
OIR    2025250     91400   17.1900 -112.4600      19.3        41       139        60
OIR    2025250     91400   17.1900 -112.4700      19.3        41       140        60
OIR    2025250     91400   17.1900 -112.4800      19.3        41       141        60
OIR    2025250     91400   17.1900 -112.4900      19.3        41       141        60
OIR    2025250     91400   17.1900 -112.5000      19.3        41       140        60
OIR    2025250     91400   17.1900 -112.5100      19.3        41       140        60
OIR    2025250     91400   17.1900 -112.5200      19.4        40       141        60
OIR    2025250     91400   17.1900 -112.5300      19.4        41       143        60
OIR    2025250     91400   17.1900 -112.5400      19.4        41       143        60
OIR    2025250     91400   17.1900 -112.5500      19.4        41       141        60
OIR    2025250     91400   17.1900 -112.5600      19.4        41       139        60
OIR    2025250     91400   17.1900 -112.5700      19.4        41       138        60
OIR    2025250     91400   17.1900 -112.5800      19.5        41       139        60
OIR    2025250     91400   17.1900 -112.5900      19.5        41       142        60
OIR    2025250     91400   17.1800 -111.3700      14.9        53       142        60
OIR    2025250     91400   17.1800 -111.3800      15.9        49       137        60
OIR    2025250     91400   17.1800 -111.3900      17.3        45       133        60
OIR    2025250     91400   17.1800 -111.4000      17.9        43       130        60
OIR    2025250     91400   17.1800 -111.4100      18.1        42       128        60
OIR    2025250     91400   17.1800 -111.4200      18.2        42       127        60
OIR    2025250     91400   17.1800 -111.4300      18.2        42       129        60
OIR    2025250     91400   17.1800 -111.4400      18.2        42       130        60
OIR    2025250     91400   17.1800 -111.4500      18.3        42       128        60
OIR    2025250     91400   17.1800 -111.4600      18.3        42       124        60
OIR    2025250     91400   17.1800 -111.4700      18.3        42       122        60
OIR    2025250     91400   17.1800 -111.4800      18.2        42       125        60
OIR    2025250     91400   17.1800 -111.4900      18.2        42       127        60
OIR    2025250     91400   17.1800 -111.5000      18.2        42       123        60
OIR    2025250     91400   17.1800 -111.5100      18.2        42       119        60
OIR    2025250     91400   17.1800 -111.5200      18.2        42       116        60
OIR    2025250     91400   17.1800 -111.5300      18.2        43       115        60
OIR    2025250     91400   17.1800 -111.5400      18.1        43       114        60
OIR    2025250     91400   17.1800 -111.5500      18.1        43       112        60
OIR    2025250     91400   17.1800 -111.5600      18.1        43       111        60
OIR    2025250     91400   17.1800 -111.5700      18.0        43       113        60
OIR    2025250     91400   17.1800 -111.5800      17.9        43       115        60
OIR    2025250     91400   17.1800 -111.5900      17.8        43       115        60
OIR    2025250     91400   17.1800 -111.6000      17.7        44       114        60
OIR    2025250     91400   17.1800 -111.6100      17.6        44       114        60
OIR    2025250     91400   17.1800 -111.6200      17.6        44       114        60
OIR    2025250     91400   17.1800 -111.6300      17.5        44       113        60
OIR    2025250     91400   17.1800 -111.6400      17.4        44       111        60
OIR    2025250     91400   17.1800 -111.6500      17.3        45       109        60
OIR    2025250     91400   17.1800 -111.6600      17.2        45       108        60
OIR    2025250     91400   17.1800 -111.6700      17.1        46       108        60
OIR    2025250     91400   17.1800 -111.6800      17.0        47       109        60
OIR    2025250     91400   17.1800 -111.6900      16.9        47       110        60
OIR    2025250     91400   17.1800 -111.7000      16.9        47       111        60
OIR    2025250     91400   17.1800 -111.7100      16.9        47       113        60
OIR    2025250     91400   17.1800 -111.7200      16.9        47       116        60
OIR    2025250     91400   17.1800 -111.7300      16.9        47       121        60
OIR    2025250     91400   17.1800 -111.7400      16.8        47       125        60
OIR    2025250     91400   17.1800 -111.7500      16.8        47       127        60
OIR    2025250     91400   17.1800 -111.7600      16.8        47       126        60
OIR    2025250     91400   17.1800 -111.7700      16.8        47       126        60
OIR    2025250     91400   17.1800 -111.7800      16.8        47       125        60
OIR    2025250     91400   17.1800 -111.7900      16.8        47       124        60
OIR    2025250     91400   17.1800 -111.8000      16.8        47       125        60
OIR    2025250     91400   17.1800 -111.8100      16.8        47       126        60
OIR    2025250     91400   17.1800 -111.8200      16.8        47       125        60
OIR    2025250     91400   17.1800 -111.8300      16.8        47       123        60
OIR    2025250     91400   17.1800 -111.8400      16.8        47       121        60
OIR    2025250     91400   17.1800 -111.8500      16.8        47       117        60
OIR    2025250     91400   17.1800 -111.8600      16.8        47       115        60
OIR    2025250     91400   17.1800 -111.8700      16.8        47       115        60
OIR    2025250     91400   17.1800 -111.8800      16.8        47       116        60
OIR    2025250     91400   17.1800 -111.8900      16.8        47       116        60
OIR    2025250     91400   17.1800 -111.9000      16.8        47       117        60
OIR    2025250     91400   17.1800 -111.9100      16.9        47       119        60
OIR    2025250     91400   17.1800 -111.9200      16.9        47       121        60
OIR    2025250     91400   17.1800 -111.9300      16.9        47       123        60
OIR    2025250     91400   17.1800 -111.9400      17.0        47       125        60
OIR    2025250     91400   17.1800 -111.9500      17.0        47       126        60
OIR    2025250     91400   17.1800 -111.9600      17.0        47       128        60
OIR    2025250     91400   17.1800 -111.9700      17.1        47       129        60
OIR    2025250     91400   17.1800 -111.9800      17.1        47       130        60
OIR    2025250     91400   17.1800 -111.9900      17.2        47       132        60
OIR    2025250     91400   17.1800 -112.0000      17.2        47       134        60
OIR    2025250     91400   17.1800 -112.0100      17.3        47       134        60
OIR    2025250     91400   17.1800 -112.0200      17.4        47       133        60
OIR    2025250     91400   17.1800 -112.0300      17.4        47       133        60
OIR    2025250     91400   17.1800 -112.0400      17.5        46       132        60
OIR    2025250     91400   17.1800 -112.0500      17.5        46       132        60
OIR    2025250     91400   17.1800 -112.0600      17.5        46       132        60
OIR    2025250     91400   17.1800 -112.0700      17.6        46       132        60
OIR    2025250     91400   17.1800 -112.0800      17.6        46       135        60
OIR    2025250     91400   17.1800 -112.0900      17.6        46       138        60
OIR    2025250     91400   17.1800 -112.1000      17.6        46       139        60
OIR    2025250     91400   17.1800 -112.1100      17.7        45       138        60
OIR    2025250     91400   17.1800 -112.1200      17.7        45       137        60
OIR    2025250     91400   17.1800 -112.1300      17.8        45       138        60
OIR    2025250     91400   17.1800 -112.1400      17.8        45       139        60
OIR    2025250     91400   17.1800 -112.1500      17.9        45       138        60
OIR    2025250     91400   17.1800 -112.1600      17.9        44       136        60
OIR    2025250     91400   17.1800 -112.1700      18.0        44       136        60
OIR    2025250     91400   17.1800 -112.1800      18.1        44       136        60
OIR    2025250     91400   17.1800 -112.1900      18.2        43       137        60
OIR    2025250     91400   17.1800 -112.2000      18.4        43       139        60
OIR    2025250     91400   17.1800 -112.2100      18.5        43       140        60
OIR    2025250     91400   17.1800 -112.2200      18.5        42       143        60
OIR    2025250     91400   17.1800 -112.2700      18.8        41       144        60
OIR    2025250     91400   17.1800 -112.2800      18.9        41       142        60
OIR    2025250     91400   17.1800 -112.2900      18.9        41       142        60
OIR    2025250     91400   17.1800 -112.3000      18.9        41       141        60
OIR    2025250     91400   17.1800 -112.3100      19.0        41       140        60
OIR    2025250     91400   17.1800 -112.3200      19.0        41       139        60
OIR    2025250     91400   17.1800 -112.3300      19.0        41       138        60
OIR    2025250     91400   17.1800 -112.3400      19.0        41       137        60
OIR    2025250     91400   17.1800 -112.3500      19.1        41       137        60
OIR    2025250     91400   17.1800 -112.3600      19.1        41       135        60
OIR    2025250     91400   17.1800 -112.3700      19.1        41       133        60
OIR    2025250     91400   17.1800 -112.3800      19.1        41       135        60
OIR    2025250     91400   17.1800 -112.3900      19.2        41       137        60
OIR    2025250     91400   17.1800 -112.4000      19.2        41       138        60
OIR    2025250     91400   17.1800 -112.4100      19.2        41       138        60
OIR    2025250     91400   17.1800 -112.4200      19.2        41       137        60
OIR    2025250     91400   17.1800 -112.4300      19.3        41       140        60
OIR    2025250     91400   17.1800 -112.4400      19.3        41       142        60
OIR    2025250     91400   17.1800 -112.4500      19.3        41       141        60
OIR    2025250     91400   17.1800 -112.4600      19.3        41       140        60
OIR    2025250     91400   17.1800 -112.4700      19.3        41       140        60
OIR    2025250     91400   17.1800 -112.4800      19.3        41       140        60
OIR    2025250     91400   17.1800 -112.4900      19.3        41       141        60
OIR    2025250     91400   17.1800 -112.5000      19.3        41       141        60
OIR    2025250     91400   17.1800 -112.5100      19.4        41       142        60
OIR    2025250     91400   17.1800 -112.5200      19.4        41       140        60
OIR    2025250     91400   17.1800 -112.5300      19.4        41       138        60
OIR    2025250     91400   17.1800 -112.5400      19.4        41       139        60
OIR    2025250     91400   17.1800 -112.5500      19.4        41       142        60
OIR    2025250     91400   17.1800 -112.5600      19.4        41       143        60
OIR    2025250     91400   17.1800 -112.5700      19.5        41       141        60
OIR    2025250     91400   17.1800 -112.5800      19.5        41       140        60
OIR    2025250     91400   17.1800 -112.5900      19.5        41       143        60
OIR    2025250     91400   17.1700 -111.3700      14.9        54       143        60
OIR    2025250     91400   17.1700 -111.3800      15.9        49       139        60
OIR    2025250     91400   17.1700 -111.3900      17.4        44       136        60
OIR    2025250     91400   17.1700 -111.4000      18.0        43       133        60
OIR    2025250     91400   17.1700 -111.4100      18.2        42       130        60
OIR    2025250     91400   17.1700 -111.4200      18.2        42       128        60
OIR    2025250     91400   17.1700 -111.4300      18.2        42       128        60
OIR    2025250     91400   17.1700 -111.4400      18.3        42       129        60
OIR    2025250     91400   17.1700 -111.4500      18.3        42       130        60
OIR    2025250     91400   17.1700 -111.4600      18.3        42       131        60
OIR    2025250     91400   17.1700 -111.4700      18.3        42       131        60
OIR    2025250     91400   17.1700 -111.4800      18.2        42       127        60
OIR    2025250     91400   17.1700 -111.4900      18.2        42       123        60
OIR    2025250     91400   17.1700 -111.5000      18.2        42       122        60
OIR    2025250     91400   17.1700 -111.5100      18.2        42       120        60
OIR    2025250     91400   17.1700 -111.5200      18.2        42       119        60
OIR    2025250     91400   17.1700 -111.5300      18.2        43       117        60
OIR    2025250     91400   17.1700 -111.5400      18.2        43       116        60
OIR    2025250     91400   17.1700 -111.5500      18.2        43       115        60
OIR    2025250     91400   17.1700 -111.5600      18.2        43       114        60
OIR    2025250     91400   17.1700 -111.5700      18.1        43       115        60
OIR    2025250     91400   17.1700 -111.5800      18.0        43       116        60
OIR    2025250     91400   17.1700 -111.5900      17.9        43       116        60
OIR    2025250     91400   17.1700 -111.6000      17.8        44       116        60
OIR    2025250     91400   17.1700 -111.6100      17.7        44       115        60
OIR    2025250     91400   17.1700 -111.6200      17.6        44       113        60
OIR    2025250     91400   17.1700 -111.6300      17.5        44       111        60
OIR    2025250     91400   17.1700 -111.6400      17.4        45       111        60
OIR    2025250     91400   17.1700 -111.6500      17.3        45       110        60
OIR    2025250     91400   17.1700 -111.6600      17.2        45       110        60
OIR    2025250     91400   17.1700 -111.6700      17.1        46       110        60
OIR    2025250     91400   17.1700 -111.6800      17.0        47       111        60
OIR    2025250     91400   17.1700 -111.6900      17.0        47       113        60
OIR    2025250     91400   17.1700 -111.7000      16.9        47       114        60
OIR    2025250     91400   17.1700 -111.7100      16.9        47       116        60
OIR    2025250     91400   17.1700 -111.7200      16.9        47       117        60
OIR    2025250     91400   17.1700 -111.7300      16.9        47       122        60
OIR    2025250     91400   17.1700 -111.7400      16.9        47       128        60
OIR    2025250     91400   17.1700 -111.7500      16.8        47       131        60
OIR    2025250     91400   17.1700 -111.7600      16.8        47       128        60
OIR    2025250     91400   17.1700 -111.7700      16.8        47       126        60
OIR    2025250     91400   17.1700 -111.7800      16.8        47       125        60
OIR    2025250     91400   17.1700 -111.7900      16.8        47       124        60
OIR    2025250     91400   17.1700 -111.8000      16.8        47       124        60
OIR    2025250     91400   17.1700 -111.8100      16.8        47       126        60
OIR    2025250     91400   17.1700 -111.8200      16.8        47       126        60
OIR    2025250     91400   17.1700 -111.8300      16.8        47       125        60
OIR    2025250     91400   17.1700 -111.8400      16.8        47       123        60
OIR    2025250     91400   17.1700 -111.8500      16.8        47       120        60
OIR    2025250     91400   17.1700 -111.8600      16.8        47       116        60
OIR    2025250     91400   17.1700 -111.8700      16.8        47       116        60
OIR    2025250     91400   17.1700 -111.8800      16.8        47       116        60
OIR    2025250     91400   17.1700 -111.8900      16.8        47       119        60
OIR    2025250     91400   17.1700 -111.9000      16.8        47       120        60
OIR    2025250     91400   17.1700 -111.9100      16.9        47       121        60
OIR    2025250     91400   17.1700 -111.9200      16.9        47       123        60
OIR    2025250     91400   17.1700 -111.9300      16.9        47       125        60
OIR    2025250     91400   17.1700 -111.9400      17.0        47       125        60
OIR    2025250     91400   17.1700 -111.9500      17.0        47       126        60
OIR    2025250     91400   17.1700 -111.9600      17.0        47       127        60
OIR    2025250     91400   17.1700 -111.9700      17.1        47       128        60
OIR    2025250     91400   17.1700 -111.9800      17.2        47       129        60
OIR    2025250     91400   17.1700 -111.9900      17.2        47       132        60
OIR    2025250     91400   17.1700 -112.0000      17.3        47       134        60
OIR    2025250     91400   17.1700 -112.0100      17.4        47       135        60
OIR    2025250     91400   17.1700 -112.0200      17.4        47       134        60
OIR    2025250     91400   17.1700 -112.0300      17.5        47       134        60
OIR    2025250     91400   17.1700 -112.0400      17.5        46       133        60
OIR    2025250     91400   17.1700 -112.0500      17.5        46       133        60
OIR    2025250     91400   17.1700 -112.0600      17.6        46       133        60
OIR    2025250     91400   17.1700 -112.0700      17.6        46       134        60
OIR    2025250     91400   17.1700 -112.0800      17.6        46       135        60
OIR    2025250     91400   17.1700 -112.0900      17.6        46       136        60
OIR    2025250     91400   17.1700 -112.1000      17.7        46       137        60
OIR    2025250     91400   17.1700 -112.1100      17.7        45       139        60
OIR    2025250     91400   17.1700 -112.1200      17.7        45       140        60
OIR    2025250     91400   17.1700 -112.1300      17.8        45       140        60
OIR    2025250     91400   17.1700 -112.1400      17.8        45       140        60
OIR    2025250     91400   17.1700 -112.1500      17.9        45       139        60
OIR    2025250     91400   17.1700 -112.1600      17.9        44       137        60
OIR    2025250     91400   17.1700 -112.1700      18.0        44       136        60
OIR    2025250     91400   17.1700 -112.1800      18.1        44       136        60
OIR    2025250     91400   17.1700 -112.1900      18.3        43       137        60
OIR    2025250     91400   17.1700 -112.2000      18.4        43       139        60
OIR    2025250     91400   17.1700 -112.2100      18.5        43       141        60
OIR    2025250     91400   17.1700 -112.2200      18.6        42       143        60
OIR    2025250     91400   17.1700 -112.2700      18.8        41       142        60
OIR    2025250     91400   17.1700 -112.2800      18.9        41       139        60
OIR    2025250     91400   17.1700 -112.2900      18.9        41       140        60
OIR    2025250     91400   17.1700 -112.3000      19.0        41       141        60
OIR    2025250     91400   17.1700 -112.3100      19.0        41       140        60
OIR    2025250     91400   17.1700 -112.3200      19.0        41       138        60
OIR    2025250     91400   17.1700 -112.3300      19.0        41       136        60
OIR    2025250     91400   17.1700 -112.3400      19.1        41       137        60
OIR    2025250     91400   17.1700 -112.3500      19.1        41       138        60
OIR    2025250     91400   17.1700 -112.3600      19.1        41       136        60
OIR    2025250     91400   17.1700 -112.3700      19.1        41       133        60
OIR    2025250     91400   17.1700 -112.3800      19.2        41       134        60
OIR    2025250     91400   17.1700 -112.3900      19.2        41       136        60
OIR    2025250     91400   17.1700 -112.4000      19.2        41       138        60
OIR    2025250     91400   17.1700 -112.4100      19.2        41       138        60
OIR    2025250     91400   17.1700 -112.4200      19.3        41       138        60
OIR    2025250     91400   17.1700 -112.4300      19.3        41       141        60
OIR    2025250     91400   17.1700 -112.4400      19.3        41       144        60
OIR    2025250     91400   17.1700 -112.4500      19.3        41       144        60
OIR    2025250     91400   17.1700 -112.4600      19.3        41       142        60
OIR    2025250     91400   17.1700 -112.4700      19.3        41       142        60
OIR    2025250     91400   17.1700 -112.4800      19.3        41       142        60
OIR    2025250     91400   17.1700 -112.4900      19.3        41       142        60
OIR    2025250     91400   17.1700 -112.5000      19.4        41       143        60
OIR    2025250     91400   17.1700 -112.5100      19.4        41       144        60
OIR    2025250     91400   17.1700 -112.5200      19.4        41       140        60
OIR    2025250     91400   17.1700 -112.5300      19.4        41       136        60
OIR    2025250     91400   17.1700 -112.5400      19.4        41       136        60
OIR    2025250     91400   17.1700 -112.5500      19.4        41       141        60
OIR    2025250     91400   17.1700 -112.5700      19.5        41       144        60
OIR    2025250     91400   17.1700 -112.5800      19.5        41       141        60
OIR    2025250     91400   17.1700 -112.5900      19.6        41       144        60
OIR    2025250     91400   17.1600 -111.3700      14.9        54       146        60
OIR    2025250     91400   17.1600 -111.3800      16.0        49       143        60
OIR    2025250     91400   17.1600 -111.3900      17.2        44       140        60
OIR    2025250     91400   17.1600 -111.4000      17.9        43       136        60
OIR    2025250     91400   17.1600 -111.4100      18.1        42       135        60
OIR    2025250     91400   17.1600 -111.4200      18.2        42       133        60
OIR    2025250     91400   17.1600 -111.4300      18.2        42       133        60
OIR    2025250     91400   17.1600 -111.4400      18.3        42       133        60
OIR    2025250     91400   17.1600 -111.4500      18.3        42       134        60
OIR    2025250     91400   17.1600 -111.4600      18.3        42       136        60
OIR    2025250     91400   17.1600 -111.4700      18.3        42       138        60
OIR    2025250     91400   17.1600 -111.4800      18.3        42       132        60
OIR    2025250     91400   17.1600 -111.4900      18.2        42       125        60
OIR    2025250     91400   17.1600 -111.5000      18.2        42       123        60
OIR    2025250     91400   17.1600 -111.5100      18.2        42       123        60
OIR    2025250     91400   17.1600 -111.5200      18.2        42       122        60
OIR    2025250     91400   17.1600 -111.5300      18.2        43       120        60
OIR    2025250     91400   17.1600 -111.5400      18.2        43       119        60
OIR    2025250     91400   17.1600 -111.5500      18.2        43       117        60
OIR    2025250     91400   17.1600 -111.5600      18.2        43       117        60
OIR    2025250     91400   17.1600 -111.5700      18.2        43       117        60
OIR    2025250     91400   17.1600 -111.5800      18.2        43       119        60
OIR    2025250     91400   17.1600 -111.5900      18.1        43       119        60
OIR    2025250     91400   17.1600 -111.6000      18.0        43       117        60
OIR    2025250     91400   17.1600 -111.6100      17.9        44       116        60
OIR    2025250     91400   17.1600 -111.6200      17.8        44       112        60
OIR    2025250     91400   17.1600 -111.6300      17.7        44       109        60
OIR    2025250     91400   17.1600 -111.6400      17.5        45       109        60
OIR    2025250     91400   17.1600 -111.6500      17.4        45       110        60
OIR    2025250     91400   17.1600 -111.6600      17.3        46       112        60
OIR    2025250     91400   17.1600 -111.6700      17.1        47       112        60
OIR    2025250     91400   17.1600 -111.6800      17.1        47       113        60
OIR    2025250     91400   17.1600 -111.6900      17.0        47       115        60
OIR    2025250     91400   17.1600 -111.7000      17.0        47       117        60
OIR    2025250     91400   17.1600 -111.7100      16.9        47       119        60
OIR    2025250     91400   17.1600 -111.7200      16.9        47       121        60
OIR    2025250     91400   17.1600 -111.7300      16.9        47       123        60
OIR    2025250     91400   17.1600 -111.7400      16.9        47       127        60
OIR    2025250     91400   17.1600 -111.7500      16.8        47       131        60
OIR    2025250     91400   17.1600 -111.7600      16.8        47       129        60
OIR    2025250     91400   17.1600 -111.7700      16.8        47       127        60
OIR    2025250     91400   17.1600 -111.7800      16.8        47       126        60
OIR    2025250     91400   17.1600 -111.7900      16.8        47       127        60
OIR    2025250     91400   17.1600 -111.8000      16.8        47       127        60
OIR    2025250     91400   17.1600 -111.8100      16.8        47       126        60
OIR    2025250     91400   17.1600 -111.8200      16.8        47       125        60
OIR    2025250     91400   17.1600 -111.8300      16.8        47       124        60
OIR    2025250     91400   17.1600 -111.8400      16.8        47       123        60
OIR    2025250     91400   17.1600 -111.8500      16.8        47       121        60
OIR    2025250     91400   17.1600 -111.8600      16.8        47       117        60
OIR    2025250     91400   17.1600 -111.8700      16.8        47       116        60
OIR    2025250     91400   17.1600 -111.8800      16.8        47       116        60
OIR    2025250     91400   17.1600 -111.8900      16.8        47       117        60
OIR    2025250     91400   17.1600 -111.9000      16.9        47       120        60
OIR    2025250     91400   17.1600 -111.9100      16.9        47       122        60
OIR    2025250     91400   17.1600 -111.9200      16.9        47       124        60
OIR    2025250     91400   17.1600 -111.9300      16.9        47       125        60
OIR    2025250     91400   17.1600 -111.9400      17.0        47       126        60
OIR    2025250     91400   17.1600 -111.9500      17.0        47       127        60
OIR    2025250     91400   17.1600 -111.9600      17.0        47       127        60
OIR    2025250     91400   17.1600 -111.9700      17.1        47       129        60
OIR    2025250     91400   17.1600 -111.9800      17.2        47       130        60
OIR    2025250     91400   17.1600 -111.9900      17.3        47       132        60
OIR    2025250     91400   17.1600 -112.0000      17.4        47       135        60
OIR    2025250     91400   17.1600 -112.0100      17.4        47       136        60
OIR    2025250     91400   17.1600 -112.0200      17.5        47       136        60
OIR    2025250     91400   17.1600 -112.0300      17.5        46       136        60
OIR    2025250     91400   17.1600 -112.0400      17.5        46       135        60
OIR    2025250     91400   17.1600 -112.0500      17.6        46       134        60
OIR    2025250     91400   17.1600 -112.0600      17.6        46       134        60
OIR    2025250     91400   17.1600 -112.0700      17.6        46       135        60
OIR    2025250     91400   17.1600 -112.0800      17.6        46       135        60
OIR    2025250     91400   17.1600 -112.0900      17.6        46       136        60
OIR    2025250     91400   17.1600 -112.1000      17.7        46       137        60
OIR    2025250     91400   17.1600 -112.1100      17.7        45       139        60
OIR    2025250     91400   17.1600 -112.1200      17.8        45       141        60
OIR    2025250     91400   17.1600 -112.1300      17.8        45       140        60
OIR    2025250     91400   17.1600 -112.1400      17.9        45       139        60
OIR    2025250     91400   17.1600 -112.1500      17.9        44       138        60
OIR    2025250     91400   17.1600 -112.1600      18.0        44       137        60
OIR    2025250     91400   17.1600 -112.1700      18.1        44       136        60
OIR    2025250     91400   17.1600 -112.1800      18.2        44       137        60
OIR    2025250     91400   17.1600 -112.1900      18.3        43       137        60
OIR    2025250     91400   17.1600 -112.2000      18.4        43       138        60
OIR    2025250     91400   17.1600 -112.2100      18.5        42       140        60
OIR    2025250     91400   17.1600 -112.2200      18.6        42       142        60
OIR    2025250     91400   17.1600 -112.2300      18.7        42       144        60
OIR    2025250     91400   17.1600 -112.2500      18.8        42       144        60
OIR    2025250     91400   17.1600 -112.2600      18.8        41       144        60
OIR    2025250     91400   17.1600 -112.2700      18.9        41       141        60
OIR    2025250     91400   17.1600 -112.2800      18.9        41       138        60
OIR    2025250     91400   17.1600 -112.2900      19.0        41       138        60
OIR    2025250     91400   17.1600 -112.3000      19.0        41       140        60
OIR    2025250     91400   17.1600 -112.3100      19.0        41       140        60
OIR    2025250     91400   17.1600 -112.3200      19.0        41       137        60
OIR    2025250     91400   17.1600 -112.3300      19.0        41       135        60
OIR    2025250     91400   17.1600 -112.3400      19.1        41       137        60
OIR    2025250     91400   17.1600 -112.3500      19.1        41       139        60
OIR    2025250     91400   17.1600 -112.3600      19.1        41       138        60
OIR    2025250     91400   17.1600 -112.3700      19.1        41       134        60
OIR    2025250     91400   17.1600 -112.3800      19.2        41       133        60
OIR    2025250     91400   17.1600 -112.3900      19.2        41       135        60
OIR    2025250     91400   17.1600 -112.4000      19.2        41       138        60
OIR    2025250     91400   17.1600 -112.4100      19.3        41       138        60
OIR    2025250     91400   17.1600 -112.4200      19.3        41       139        60
OIR    2025250     91400   17.1600 -112.4300      19.3        41       142        60
OIR    2025250     91400   17.1600 -112.5200      19.4        41       144        60
OIR    2025250     91400   17.1600 -112.5300      19.4        41       141        60
OIR    2025250     91400   17.1600 -112.5400      19.4        41       139        60
OIR    2025250     91400   17.1600 -112.5500      19.5        41       142        60
OIR    2025250     91400   17.1600 -112.5600      19.5        41       144        60
OIR    2025250     91400   17.1600 -112.5700      19.5        41       145        60
OIR    2025250     91400   17.1600 -112.5800      19.5        41       144        60
OIR    2025250     91400   17.1600 -112.5900      19.6        41       144        60
OIR    2025250     91400   17.1500 -111.3900      16.8        47       144        60
OIR    2025250     91400   17.1500 -111.4000      17.5        44       140        60
OIR    2025250     91400   17.1500 -111.4100      18.0        43       140        60
OIR    2025250     91400   17.1500 -111.4200      18.2        42       142        60
OIR    2025250     91400   17.1500 -111.4300      18.2        42       143        60
OIR    2025250     91400   17.1500 -111.4400      18.3        42       143        60
OIR    2025250     91400   17.1500 -111.4500      18.3        42       142        60
OIR    2025250     91400   17.1500 -111.4600      18.3        42       140        60
OIR    2025250     91400   17.1500 -111.4700      18.3        42       139        60
OIR    2025250     91400   17.1500 -111.4800      18.2        42       135        60
OIR    2025250     91400   17.1500 -111.4900      18.2        42       131        60
OIR    2025250     91400   17.1500 -111.5000      18.2        42       128        60
OIR    2025250     91400   17.1500 -111.5100      18.2        42       127        60
OIR    2025250     91400   17.1500 -111.5200      18.2        43       126        60
OIR    2025250     91400   17.1500 -111.5300      18.2        43       125        60
OIR    2025250     91400   17.1500 -111.5400      18.2        43       124        60
OIR    2025250     91400   17.1500 -111.5500      18.2        43       124        60
OIR    2025250     91400   17.1500 -111.5600      18.2        43       125        60
OIR    2025250     91400   17.1500 -111.5700      18.2        43       126        60
OIR    2025250     91400   17.1500 -111.5800      18.2        43       124        60
OIR    2025250     91400   17.1500 -111.5900      18.2        43       123        60
OIR    2025250     91400   17.1500 -111.6000      18.2        43       122        60
OIR    2025250     91400   17.1500 -111.6100      18.1        43       120        60
OIR    2025250     91400   17.1500 -111.6200      17.9        44       117        60
OIR    2025250     91400   17.1500 -111.6300      17.8        44       115        60
OIR    2025250     91400   17.1500 -111.6400      17.6        45       114        60
OIR    2025250     91400   17.1500 -111.6500      17.4        46       116        60
OIR    2025250     91400   17.1500 -111.6600      17.3        46       119        60
OIR    2025250     91400   17.1500 -111.6700      17.2        47       117        60
OIR    2025250     91400   17.1500 -111.6800      17.1        47       116        60
OIR    2025250     91400   17.1500 -111.6900      17.0        47       119        60
OIR    2025250     91400   17.1500 -111.7000      17.0        47       121        60
OIR    2025250     91400   17.1500 -111.7100      16.9        47       123        60
OIR    2025250     91400   17.1500 -111.7200      16.9        47       124        60
OIR    2025250     91400   17.1500 -111.7300      16.9        47       125        60
OIR    2025250     91400   17.1500 -111.7400      16.9        47       127        60
OIR    2025250     91400   17.1500 -111.7500      16.9        47       130        60
OIR    2025250     91400   17.1500 -111.7600      16.9        47       129        60
OIR    2025250     91400   17.1500 -111.7700      16.8        47       128        60
OIR    2025250     91400   17.1500 -111.7800      16.8        47       127        60
OIR    2025250     91400   17.1500 -111.7900      16.8        47       126        60
OIR    2025250     91400   17.1500 -111.8000      16.8        47       126        60
OIR    2025250     91400   17.1500 -111.8100      16.8        47       125        60
OIR    2025250     91400   17.1500 -111.8200      16.8        47       124        60
OIR    2025250     91400   17.1500 -111.8300      16.8        47       123        60
OIR    2025250     91400   17.1500 -111.8400      16.8        47       123        60
OIR    2025250     91400   17.1500 -111.8500      16.8        47       122        60
OIR    2025250     91400   17.1500 -111.8600      16.8        47       119        60
OIR    2025250     91400   17.1500 -111.8700      16.8        47       116        60
OIR    2025250     91400   17.1500 -111.8800      16.8        47       117        60
OIR    2025250     91400   17.1500 -111.8900      16.9        47       117        60
OIR    2025250     91400   17.1500 -111.9000      16.9        47       120        60
OIR    2025250     91400   17.1500 -111.9100      16.9        47       123        60
OIR    2025250     91400   17.1500 -111.9200      16.9        47       125        60
OIR    2025250     91400   17.1500 -111.9300      16.9        47       126        60
OIR    2025250     91400   17.1500 -111.9400      17.0        47       127        60
OIR    2025250     91400   17.1500 -111.9500      17.0        47       128        60
OIR    2025250     91400   17.1500 -111.9600      17.1        47       128        60
OIR    2025250     91400   17.1500 -111.9700      17.2        47       130        60
OIR    2025250     91400   17.1500 -111.9800      17.3        47       132        60
OIR    2025250     91400   17.1500 -111.9900      17.3        47       133        60
OIR    2025250     91400   17.1500 -112.0000      17.4        47       135        60
OIR    2025250     91400   17.1500 -112.0100      17.5        47       137        60
OIR    2025250     91400   17.1500 -112.0200      17.5        47       138        60
OIR    2025250     91400   17.1500 -112.0300      17.5        46       139        60
OIR    2025250     91400   17.1500 -112.0400      17.6        46       137        60
OIR    2025250     91400   17.1500 -112.0500      17.6        46       135        60
OIR    2025250     91400   17.1500 -112.0600      17.6        46       134        60
OIR    2025250     91400   17.1500 -112.0700      17.6        46       135        60
OIR    2025250     91400   17.1500 -112.0800      17.6        46       135        60
OIR    2025250     91400   17.1500 -112.0900      17.7        46       137        60
OIR    2025250     91400   17.1500 -112.1000      17.7        46       138        60
OIR    2025250     91400   17.1500 -112.1100      17.8        45       139        60
OIR    2025250     91400   17.1500 -112.1200      17.8        45       140        60
OIR    2025250     91400   17.1500 -112.1300      17.9        45       139        60
OIR    2025250     91400   17.1500 -112.1400      17.9        45       138        60
OIR    2025250     91400   17.1500 -112.1500      18.0        44       136        60
OIR    2025250     91400   17.1500 -112.1600      18.0        44       136        60
OIR    2025250     91400   17.1500 -112.1700      18.1        44       136        60
OIR    2025250     91400   17.1500 -112.1800      18.2        43       138        60
OIR    2025250     91400   17.1500 -112.1900      18.4        43       139        60
OIR    2025250     91400   17.1500 -112.2000      18.5        43       139        60
OIR    2025250     91400   17.1500 -112.2100      18.5        42       138        60
OIR    2025250     91400   17.1500 -112.2200      18.6        42       138        60
OIR    2025250     91400   17.1500 -112.2300      18.7        42       141        60
OIR    2025250     91400   17.1500 -112.2400      18.7        42       142        60
OIR    2025250     91400   17.1500 -112.2500      18.8        42       141        60
OIR    2025250     91400   17.1500 -112.2600      18.9        41       140        60
OIR    2025250     91400   17.1500 -112.2700      18.9        41       140        60
OIR    2025250     91400   17.1500 -112.2800      18.9        41       140        60
OIR    2025250     91400   17.1500 -112.2900      19.0        41       140        60
OIR    2025250     91400   17.1500 -112.3000      19.0        41       141        60
OIR    2025250     91400   17.1500 -112.3100      19.0        41       142        60
OIR    2025250     91400   17.1500 -112.3200      19.0        41       139        60
OIR    2025250     91400   17.1500 -112.3300      19.1        41       137        60
OIR    2025250     91400   17.1500 -112.3400      19.1        41       138        60
OIR    2025250     91400   17.1500 -112.3500      19.1        41       139        60
OIR    2025250     91400   17.1500 -112.3600      19.1        41       139        60
OIR    2025250     91400   17.1500 -112.3700      19.2        41       138        60
OIR    2025250     91400   17.1500 -112.3800      19.2        41       137        60
OIR    2025250     91400   17.1500 -112.3900      19.2        41       139        60
OIR    2025250     91400   17.1500 -112.4000      19.2        41       140        60
OIR    2025250     91400   17.1500 -112.4100      19.3        41       140        60
OIR    2025250     91400   17.1500 -112.4200      19.3        41       140        60
OIR    2025250     91400   17.1500 -112.4300      19.3        41       142        60
OIR    2025250     91400   17.1500 -112.5300      19.4        41       144        60
OIR    2025250     91400   17.1500 -112.5400      19.4        41       142        60
OIR    2025250     91400   17.1500 -112.5500      19.5        41       143        60
OIR    2025250     91400   17.1500 -112.5600      19.5        41       144        60
OIR    2025250     91400   17.1500 -112.5700      19.5        41       145        60
OIR    2025250     91400   17.1500 -112.6100      19.7        41       144        60
OIR    2025250     91400   17.1500 -112.6200      19.7        41       143        60
OIR    2025250     91400   17.1500 -112.6300      19.8        41       141        60
OIR    2025250     91400   17.1400 -111.4700      18.2        42       143        60
OIR    2025250     91400   17.1400 -111.4800      18.2        42       139        60
OIR    2025250     91400   17.1400 -111.4900      18.2        42       136        60
OIR    2025250     91400   17.1400 -111.5000      18.2        42       133        60
OIR    2025250     91400   17.1400 -111.5100      18.2        43       133        60
OIR    2025250     91400   17.1400 -111.5200      18.2        43       132        60
OIR    2025250     91400   17.1400 -111.5300      18.2        43       131        60
OIR    2025250     91400   17.1400 -111.5400      18.2        43       130        60
OIR    2025250     91400   17.1400 -111.5500      18.2        43       131        60
OIR    2025250     91400   17.1400 -111.5600      18.2        43       133        60
OIR    2025250     91400   17.1400 -111.5700      18.2        43       134        60
OIR    2025250     91400   17.1400 -111.5800      18.2        43       131        60
OIR    2025250     91400   17.1400 -111.5900      18.2        43       128        60
OIR    2025250     91400   17.1400 -111.6000      18.2        43       126        60
OIR    2025250     91400   17.1400 -111.6100      18.1        43       124        60
OIR    2025250     91400   17.1400 -111.6200      18.1        44       123        60
OIR    2025250     91400   17.1400 -111.6300      17.9        44       121        60
OIR    2025250     91400   17.1400 -111.6400      17.7        45       122        60
OIR    2025250     91400   17.1400 -111.6500      17.5        46       124        60
OIR    2025250     91400   17.1400 -111.6600      17.4        46       127        60
OIR    2025250     91400   17.1400 -111.6700      17.3        47       126        60
OIR    2025250     91400   17.1400 -111.6800      17.2        47       123        60
OIR    2025250     91400   17.1400 -111.6900      17.1        47       123        60
OIR    2025250     91400   17.1400 -111.7000      17.1        47       125        60
OIR    2025250     91400   17.1400 -111.7100      17.0        47       126        60
OIR    2025250     91400   17.1400 -111.7200      16.9        47       126        60
OIR    2025250     91400   17.1400 -111.7300      16.9        47       127        60
OIR    2025250     91400   17.1400 -111.7400      16.9        47       128        60
OIR    2025250     91400   17.1400 -111.7500      16.9        47       129        60
OIR    2025250     91400   17.1400 -111.7600      16.9        47       129        60
OIR    2025250     91400   17.1400 -111.7700      16.9        47       128        60
OIR    2025250     91400   17.1400 -111.7800      16.9        47       127        60
OIR    2025250     91400   17.1400 -111.7900      16.8        47       124        60
OIR    2025250     91400   17.1400 -111.8000      16.8        47       122        60
OIR    2025250     91400   17.1400 -111.8100      16.8        47       123        60
OIR    2025250     91400   17.1400 -111.8200      16.8        47       124        60
OIR    2025250     91400   17.1400 -111.8300      16.8        47       124        60
OIR    2025250     91400   17.1400 -111.8400      16.8        47       124        60
OIR    2025250     91400   17.1400 -111.8500      16.8        47       123        60
OIR    2025250     91400   17.1400 -111.8600      16.8        47       122        60
OIR    2025250     91400   17.1400 -111.8700      16.9        47       120        60
OIR    2025250     91400   17.1400 -111.8800      16.9        47       121        60
OIR    2025250     91400   17.1400 -111.8900      16.9        47       122        60
OIR    2025250     91400   17.1400 -111.9000      16.9        47       124        60
OIR    2025250     91400   17.1400 -111.9100      16.9        47       125        60
OIR    2025250     91400   17.1400 -111.9200      16.9        47       126        60
OIR    2025250     91400   17.1400 -111.9300      16.9        47       127        60
OIR    2025250     91400   17.1400 -111.9400      17.0        47       127        60
OIR    2025250     91400   17.1400 -111.9500      17.0        47       128        60
OIR    2025250     91400   17.1400 -111.9600      17.1        47       129        60
OIR    2025250     91400   17.1400 -111.9700      17.2        47       130        60
OIR    2025250     91400   17.1400 -111.9800      17.3        47       132        60
OIR    2025250     91400   17.1400 -111.9900      17.4        47       134        60
OIR    2025250     91400   17.1400 -112.0000      17.5        47       135        60
OIR    2025250     91400   17.1400 -112.0100      17.5        47       137        60
OIR    2025250     91400   17.1400 -112.0200      17.5        47       138        60
OIR    2025250     91400   17.1400 -112.0300      17.6        46       138        60
OIR    2025250     91400   17.1400 -112.0400      17.6        46       137        60
OIR    2025250     91400   17.1400 -112.0500      17.6        46       136        60
OIR    2025250     91400   17.1400 -112.0600      17.6        46       136        60
OIR    2025250     91400   17.1400 -112.0700      17.6        46       137        60
OIR    2025250     91400   17.1400 -112.0800      17.6        46       138        60
OIR    2025250     91400   17.1400 -112.0900      17.7        46       139        60
OIR    2025250     91400   17.1400 -112.1000      17.7        46       140        60
OIR    2025250     91400   17.1400 -112.1100      17.8        45       141        60
OIR    2025250     91400   17.1400 -112.1200      17.8        45       141        60
OIR    2025250     91400   17.1400 -112.1300      17.9        45       140        60
OIR    2025250     91400   17.1400 -112.1400      17.9        45       138        60
OIR    2025250     91400   17.1400 -112.1500      18.0        44       137        60
OIR    2025250     91400   17.1400 -112.1600      18.1        44       136        60
OIR    2025250     91400   17.1400 -112.1700      18.2        44       136        60
OIR    2025250     91400   17.1400 -112.1800      18.3        43       138        60
OIR    2025250     91400   17.1400 -112.1900      18.4        43       140        60
OIR    2025250     91400   17.1400 -112.2000      18.5        43       141        60
OIR    2025250     91400   17.1400 -112.2100      18.6        42       138        60
OIR    2025250     91400   17.1400 -112.2200      18.6        42       136        60
OIR    2025250     91400   17.1400 -112.2300      18.7        42       138        60
OIR    2025250     91400   17.1400 -112.2400      18.8        42       141        60
OIR    2025250     91400   17.1400 -112.2500      18.8        41       140        60
OIR    2025250     91400   17.1400 -112.2600      18.9        41       138        60
OIR    2025250     91400   17.1400 -112.2700      18.9        41       139        60
OIR    2025250     91400   17.1400 -112.2800      19.0        41       141        60
OIR    2025250     91400   17.1400 -112.2900      19.0        41       143        60
OIR    2025250     91400   17.1400 -112.3000      19.0        41       142        60
OIR    2025250     91400   17.1400 -112.3100      19.0        41       142        60
OIR    2025250     91400   17.1400 -112.3200      19.1        41       142        60
OIR    2025250     91400   17.1400 -112.3300      19.1        41       141        60
OIR    2025250     91400   17.1400 -112.3400      19.1        41       140        60
OIR    2025250     91400   17.1400 -112.3500      19.1        41       138        60
OIR    2025250     91400   17.1400 -112.3600      19.1        41       139        60
OIR    2025250     91400   17.1400 -112.3700      19.2        41       141        60
OIR    2025250     91400   17.1400 -112.3800      19.2        41       143        60
OIR    2025250     91400   17.1400 -112.3900      19.2        41       144        60
OIR    2025250     91400   17.1400 -112.4000      19.3        41       144        60
OIR    2025250     91400   17.1400 -112.4100      19.3        41       143        60
OIR    2025250     91400   17.1400 -112.4200      19.3        41       142        60
OIR    2025250     91400   17.1400 -112.4300      19.3        41       142        60
OIR    2025250     91400   17.1400 -112.4400      19.3        41       144        60
OIR    2025250     91400   17.1400 -112.5200      19.4        41       143        60
OIR    2025250     91400   17.1400 -112.5300      19.4        41       142        60
OIR    2025250     91400   17.1400 -112.5400      19.5        41       141        60
OIR    2025250     91400   17.1400 -112.5500      19.5        41       143        60
OIR    2025250     91400   17.1400 -112.5600      19.5        41       144        60
OIR    2025250     91400   17.1300 -111.4900      17.9        43       140        60
OIR    2025250     91400   17.1300 -111.5000      17.9        43       136        60
OIR    2025250     91400   17.1300 -111.5100      18.0        43       139        60
OIR    2025250     91400   17.1300 -111.5200      18.1        43       142        60
OIR    2025250     91400   17.1300 -111.5300      18.2        43       143        60
OIR    2025250     91400   17.1300 -111.5400      18.2        43       143        60
OIR    2025250     91400   17.1300 -111.5500      18.2        43       142        60
OIR    2025250     91400   17.1300 -111.5600      18.2        43       142        60
OIR    2025250     91400   17.1300 -111.5700      18.2        43       141        60
OIR    2025250     91400   17.1300 -111.5800      18.2        43       136        60
OIR    2025250     91400   17.1300 -111.5900      18.2        43       131        60
OIR    2025250     91400   17.1300 -111.6000      18.2        43       131        60
OIR    2025250     91400   17.1300 -111.6100      18.2        43       134        60
OIR    2025250     91400   17.1300 -111.6200      18.1        44       134        60
OIR    2025250     91400   17.1300 -111.6300      18.0        44       131        60
OIR    2025250     91400   17.1300 -111.6400      17.8        45       129        60
OIR    2025250     91400   17.1300 -111.6500      17.6        46       128        60
OIR    2025250     91400   17.1300 -111.6600      17.5        46       128        60
OIR    2025250     91400   17.1300 -111.6700      17.4        47       128        60
OIR    2025250     91400   17.1300 -111.6800      17.3        47       127        60
OIR    2025250     91400   17.1300 -111.6900      17.3        47       127        60
OIR    2025250     91400   17.1300 -111.7000      17.2        47       128        60
OIR    2025250     91400   17.1300 -111.7100      17.1        47       130        60
OIR    2025250     91400   17.1300 -111.7200      17.0        48       129        60
OIR    2025250     91400   17.1300 -111.7300      17.0        47       129        60
OIR    2025250     91400   17.1300 -111.7400      16.9        47       128        60
OIR    2025250     91400   17.1300 -111.7500      16.9        47       127        60
OIR    2025250     91400   17.1300 -111.7600      16.9        47       127        60
OIR    2025250     91400   17.1300 -111.7700      16.9        47       128        60
OIR    2025250     91400   17.1300 -111.7800      16.9        47       129        60
OIR    2025250     91400   17.1300 -111.7900      16.9        47       126        60
OIR    2025250     91400   17.1300 -111.8000      16.8        47       122        60
OIR    2025250     91400   17.1300 -111.8100      16.8        47       122        60
OIR    2025250     91400   17.1300 -111.8200      16.8        47       123        60
OIR    2025250     91400   17.1300 -111.8300      16.8        47       124        60
OIR    2025250     91400   17.1300 -111.8400      16.8        47       124        60
OIR    2025250     91400   17.1300 -111.8500      16.8        47       124        60
OIR    2025250     91400   17.1300 -111.8600      16.9        47       124        60
OIR    2025250     91400   17.1300 -111.8700      16.9        47       123        60
OIR    2025250     91400   17.1300 -111.8800      16.9        47       124        60
OIR    2025250     91400   17.1300 -111.8900      16.9        47       126        60
OIR    2025250     91400   17.1300 -111.9000      16.9        47       127        60
OIR    2025250     91400   17.1300 -111.9100      16.9        47       128        60
OIR    2025250     91400   17.1300 -111.9200      16.9        47       129        60
OIR    2025250     91400   17.1300 -111.9300      16.9        47       128        60
OIR    2025250     91400   17.1300 -111.9400      17.0        47       128        60
OIR    2025250     91400   17.1300 -111.9500      17.1        47       129        60
OIR    2025250     91400   17.1300 -111.9600      17.1        47       130        60
OIR    2025250     91400   17.1300 -111.9700      17.3        47       131        60
OIR    2025250     91400   17.1300 -111.9800      17.4        47       132        60
OIR    2025250     91400   17.1300 -111.9900      17.4        47       134        60
OIR    2025250     91400   17.1300 -112.0000      17.5        47       136        60
OIR    2025250     91400   17.1300 -112.0100      17.5        47       137        60
OIR    2025250     91400   17.1300 -112.0200      17.5        46       137        60
OIR    2025250     91400   17.1300 -112.0300      17.6        46       136        60
OIR    2025250     91400   17.1300 -112.0400      17.6        46       136        60
OIR    2025250     91400   17.1300 -112.0500      17.6        46       136        60
OIR    2025250     91400   17.1300 -112.0600      17.6        46       137        60
OIR    2025250     91400   17.1300 -112.0700      17.6        46       140        60
OIR    2025250     91400   17.1300 -112.0800      17.7        46       142        60
OIR    2025250     91400   17.1300 -112.0900      17.7        46       143        60
OIR    2025250     91400   17.1300 -112.1000      17.8        45       144        60
OIR    2025250     91400   17.1300 -112.1100      17.8        45       143        60
OIR    2025250     91400   17.1300 -112.1200      17.9        45       143        60
OIR    2025250     91400   17.1300 -112.1300      17.9        45       142        60
OIR    2025250     91400   17.1300 -112.1400      18.0        45       141        60
OIR    2025250     91400   17.1300 -112.1500      18.0        44       140        60
OIR    2025250     91400   17.1300 -112.1600      18.1        44       139        60
OIR    2025250     91400   17.1300 -112.1700      18.2        44       138        60
OIR    2025250     91400   17.1300 -112.1800      18.3        43       138        60
OIR    2025250     91400   17.1300 -112.1900      18.4        43       140        60
OIR    2025250     91400   17.1300 -112.2000      18.5        43       141        60
OIR    2025250     91400   17.1300 -112.2100      18.6        42       141        60
OIR    2025250     91400   17.1300 -112.2200      18.7        42       142        60
OIR    2025250     91400   17.1300 -112.2300      18.8        42       143        60
OIR    2025250     91400   17.1300 -112.2400      18.8        42       144        60
OIR    2025250     91400   17.1300 -112.2500      18.9        41       143        60
OIR    2025250     91400   17.1300 -112.2600      18.9        41       142        60
OIR    2025250     91400   17.1300 -112.2700      18.9        41       142        60
OIR    2025250     91400   17.1300 -112.2800      19.0        41       142        60
OIR    2025250     91400   17.1300 -112.2900      19.0        41       143        60
OIR    2025250     91400   17.1300 -112.3000      19.0        41       142        60
OIR    2025250     91400   17.1300 -112.3100      19.0        41       142        60
OIR    2025250     91400   17.1300 -112.3200      19.1        41       141        60
OIR    2025250     91400   17.1300 -112.3300      19.1        41       140        60
OIR    2025250     91400   17.1300 -112.3400      19.1        41       140        60
OIR    2025250     91400   17.1300 -112.3500      19.1        41       139        60
OIR    2025250     91400   17.1300 -112.3600      19.2        41       139        60
OIR    2025250     91400   17.1300 -112.3700      19.2        41       142        60
OIR    2025250     91400   17.1300 -112.3800      19.2        41       144        60
OIR    2025250     91400   17.1300 -112.4200      19.3        41       144        60
OIR    2025250     91400   17.1300 -112.4300      19.3        41       144        60
OIR    2025250     91400   17.1300 -112.5100      19.4        41       145        60
OIR    2025250     91400   17.1300 -112.5200      19.4        41       142        60
OIR    2025250     91400   17.1300 -112.5300      19.5        41       142        60
OIR    2025250     91400   17.1300 -112.5400      19.5        41       142        60
OIR    2025250     91400   17.1300 -112.5500      19.5        41       143        60
OIR    2025250     91400   17.1300 -112.5600      19.5        41       144        60
OIR    2025250     91400   17.1200 -111.5000      17.7        43       141        60
OIR    2025250     91400   17.1200 -111.5800      18.2        43       142        60
OIR    2025250     91400   17.1200 -111.5900      18.2        43       135        60
OIR    2025250     91400   17.1200 -111.6000      18.2        43       133        60
OIR    2025250     91400   17.1200 -111.6100      18.2        43       141        60
OIR    2025250     91400   17.1200 -111.6300      18.0        44       143        60
OIR    2025250     91400   17.1200 -111.6400      17.9        45       137        60
OIR    2025250     91400   17.1200 -111.6500      17.7        46       133        60
OIR    2025250     91400   17.1200 -111.6600      17.6        46       129        60
OIR    2025250     91400   17.1200 -111.6700      17.5        47       129        60
OIR    2025250     91400   17.1200 -111.6800      17.5        47       130        60
OIR    2025250     91400   17.1200 -111.6900      17.4        47       131        60
OIR    2025250     91400   17.1200 -111.7000      17.4        47       132        60
OIR    2025250     91400   17.1200 -111.7100      17.3        48       133        60
OIR    2025250     91400   17.1200 -111.7200      17.1        48       133        60
OIR    2025250     91400   17.1200 -111.7300      17.0        48       131        60
OIR    2025250     91400   17.1200 -111.7400      17.0        47       128        60
OIR    2025250     91400   17.1200 -111.7500      16.9        47       124        60
OIR    2025250     91400   17.1200 -111.7600      16.9        47       123        60
OIR    2025250     91400   17.1200 -111.7700      16.9        47       126        60
OIR    2025250     91400   17.1200 -111.7800      16.9        47       129        60
OIR    2025250     91400   17.1200 -111.7900      16.9        47       129        60
OIR    2025250     91400   17.1200 -111.8000      16.9        47       128        60
OIR    2025250     91400   17.1200 -111.8100      16.9        47       126        60
OIR    2025250     91400   17.1200 -111.8200      16.9        47       124        60
OIR    2025250     91400   17.1200 -111.8300      16.9        47       123        60
OIR    2025250     91400   17.1200 -111.8400      16.9        47       125        60
OIR    2025250     91400   17.1200 -111.8500      16.9        47       126        60
OIR    2025250     91400   17.1200 -111.8600      16.9        47       125        60
OIR    2025250     91400   17.1200 -111.8700      16.9        47       125        60
OIR    2025250     91400   17.1200 -111.8800      16.9        47       125        60
OIR    2025250     91400   17.1200 -111.8900      16.9        47       126        60
OIR    2025250     91400   17.1200 -111.9000      16.9        47       127        60
OIR    2025250     91400   17.1200 -111.9100      16.9        47       128        60
OIR    2025250     91400   17.1200 -111.9200      16.9        47       129        60
OIR    2025250     91400   17.1200 -111.9300      17.0        47       129        60
OIR    2025250     91400   17.1200 -111.9400      17.0        47       129        60
OIR    2025250     91400   17.1200 -111.9500      17.1        47       129        60
OIR    2025250     91400   17.1200 -111.9600      17.2        47       130        60
OIR    2025250     91400   17.1200 -111.9700      17.3        47       131        60
OIR    2025250     91400   17.1200 -111.9800      17.4        47       132        60
OIR    2025250     91400   17.1200 -111.9900      17.5        47       133        60
OIR    2025250     91400   17.1200 -112.0000      17.5        47       135        60
OIR    2025250     91400   17.1200 -112.0100      17.5        46       136        60
OIR    2025250     91400   17.1200 -112.0200      17.6        46       137        60
OIR    2025250     91400   17.1200 -112.0300      17.6        46       137        60
OIR    2025250     91400   17.1200 -112.0400      17.6        46       136        60
OIR    2025250     91400   17.1200 -112.0500      17.6        46       137        60
OIR    2025250     91400   17.1200 -112.0600      17.6        46       137        60
OIR    2025250     91400   17.1200 -112.0700      17.7        46       139        60
OIR    2025250     91400   17.1200 -112.0800      17.7        46       142        60
OIR    2025250     91400   17.1200 -112.0900      17.7        46       143        60
OIR    2025250     91400   17.1200 -112.1000      17.8        45       143        60
OIR    2025250     91400   17.1200 -112.1100      17.8        45       143        60
OIR    2025250     91400   17.1200 -112.1200      17.9        45       142        60
OIR    2025250     91400   17.1200 -112.1300      17.9        45       142        60
OIR    2025250     91400   17.1200 -112.1400      18.0        44       142        60
OIR    2025250     91400   17.1200 -112.1500      18.1        44       142        60
OIR    2025250     91400   17.1200 -112.1600      18.2        44       142        60
OIR    2025250     91400   17.1200 -112.1700      18.3        44       140        60
OIR    2025250     91400   17.1200 -112.1800      18.4        43       140        60
OIR    2025250     91400   17.1200 -112.1900      18.5        43       140        60
OIR    2025250     91400   17.1200 -112.2000      18.6        42       141        60
OIR    2025250     91400   17.1200 -112.2100      18.6        42       143        60
OIR    2025250     91400   17.1200 -112.2600      18.9        41       144        60
OIR    2025250     91400   17.1200 -112.2700      19.0        41       144        60
OIR    2025250     91400   17.1200 -112.2800      19.0        41       144        60
OIR    2025250     91400   17.1200 -112.2900      19.0        41       144        60
OIR    2025250     91400   17.1200 -112.3000      19.0        41       143        60
OIR    2025250     91400   17.1200 -112.3100      19.1        41       142        60
OIR    2025250     91400   17.1200 -112.3200      19.1        41       140        60
OIR    2025250     91400   17.1200 -112.3300      19.1        41       139        60
OIR    2025250     91400   17.1200 -112.3400      19.1        41       139        60
OIR    2025250     91400   17.1200 -112.3500      19.1        41       139        60
OIR    2025250     91400   17.1200 -112.3600      19.2        41       140        60
OIR    2025250     91400   17.1200 -112.3700      19.2        41       143        60
OIR    2025250     91400   17.1200 -112.5300      19.5        41       145        60
OIR    2025250     91400   17.1200 -112.5400      19.5        41       144        60
OIR    2025250     91400   17.1200 -112.5500      19.5        41       144        60
OIR    2025250     91400   17.1200 -112.5600      19.5        41       143        60
OIR    2025250     91400   17.1200 -112.5700      19.6        41       142        60
OIR    2025250     91400   17.1200 -112.5800      19.6        41       143        60
OIR    2025250     91400   17.1200 -112.5900      19.7        41       144        60
OIR    2025250     91400   17.1200 -112.6000      19.8        41       144        60
OIR    2025250     91400   17.1100 -111.6000      18.2        43       144        60
OIR    2025250     91400   17.1100 -111.6400      17.9        45       144        60
OIR    2025250     91400   17.1100 -111.6500      17.8        45       141        60
OIR    2025250     91400   17.1100 -111.6600      17.7        46       138        60
OIR    2025250     91400   17.1100 -111.6700      17.7        46       137        60
OIR    2025250     91400   17.1100 -111.6800      17.6        47       137        60
OIR    2025250     91400   17.1100 -111.6900      17.6        47       136        60
OIR    2025250     91400   17.1100 -111.7000      17.6        48       136        60
OIR    2025250     91400   17.1100 -111.7100      17.5        48       135        60
OIR    2025250     91400   17.1100 -111.7200      17.3        48       134        60
OIR    2025250     91400   17.1100 -111.7300      17.2        48       132        60
OIR    2025250     91400   17.1100 -111.7400      17.1        48       130        60
OIR    2025250     91400   17.1100 -111.7500      17.0        48       127        60
OIR    2025250     91400   17.1100 -111.7600      16.9        47       124        60
OIR    2025250     91400   17.1100 -111.7700      16.9        47       127        60
OIR    2025250     91400   17.1100 -111.7800      16.9        47       129        60
OIR    2025250     91400   17.1100 -111.7900      16.9        47       130        60
OIR    2025250     91400   17.1100 -111.8000      16.9        47       129        60
OIR    2025250     91400   17.1100 -111.8100      16.9        47       128        60
OIR    2025250     91400   17.1100 -111.8200      16.9        47       126        60
OIR    2025250     91400   17.1100 -111.8300      16.9        47       124        60
OIR    2025250     91400   17.1100 -111.8400      16.9        47       125        60
OIR    2025250     91400   17.1100 -111.8500      16.9        47       127        60
OIR    2025250     91400   17.1100 -111.8600      16.9        47       127        60
OIR    2025250     91400   17.1100 -111.8700      16.9        47       127        60
OIR    2025250     91400   17.1100 -111.8800      16.9        47       127        60
OIR    2025250     91400   17.1100 -111.8900      16.9        47       127        60
OIR    2025250     91400   17.1100 -111.9000      16.9        47       127        60
OIR    2025250     91400   17.1100 -111.9100      16.9        47       129        60
OIR    2025250     91400   17.1100 -111.9200      17.0        47       130        60
OIR    2025250     91400   17.1100 -111.9300      17.0        47       130        60
OIR    2025250     91400   17.1100 -111.9400      17.0        47       130        60
OIR    2025250     91400   17.1100 -111.9500      17.1        47       130        60
OIR    2025250     91400   17.1100 -111.9600      17.2        47       130        60
OIR    2025250     91400   17.1100 -111.9700      17.3        47       130        60
OIR    2025250     91400   17.1100 -111.9800      17.4        47       131        60
OIR    2025250     91400   17.1100 -111.9900      17.5        47       132        60
OIR    2025250     91400   17.1100 -112.0000      17.5        46       134        60
OIR    2025250     91400   17.1100 -112.0100      17.6        46       135        60
OIR    2025250     91400   17.1100 -112.0200      17.6        46       137        60
OIR    2025250     91400   17.1100 -112.0300      17.6        46       137        60
OIR    2025250     91400   17.1100 -112.0400      17.6        46       137        60
OIR    2025250     91400   17.1100 -112.0500      17.6        46       137        60
OIR    2025250     91400   17.1100 -112.0600      17.6        46       137        60
OIR    2025250     91400   17.1100 -112.0700      17.7        46       138        60
OIR    2025250     91400   17.1100 -112.0800      17.7        46       140        60
OIR    2025250     91400   17.1100 -112.0900      17.8        45       140        60
OIR    2025250     91400   17.1100 -112.1000      17.8        45       139        60
OIR    2025250     91400   17.1100 -112.1100      17.9        45       139        60
OIR    2025250     91400   17.1100 -112.1200      17.9        45       139        60
OIR    2025250     91400   17.1100 -112.1300      18.0        45       139        60
OIR    2025250     91400   17.1100 -112.1400      18.0        44       141        60
OIR    2025250     91400   17.1100 -112.1500      18.1        44       143        60
OIR    2025250     91400   17.1100 -112.1600      18.2        44       143        60
OIR    2025250     91400   17.1100 -112.1700      18.3        43       142        60
OIR    2025250     91400   17.1100 -112.1800      18.4        43       142        60
OIR    2025250     91400   17.1100 -112.1900      18.5        43       143        60
OIR    2025250     91400   17.1100 -112.2000      18.6        42       144        60
OIR    2025250     91400   17.1100 -112.2100      18.7        42       144        60
OIR    2025250     91400   17.1100 -112.2200      18.8        42       143        60
OIR    2025250     91400   17.1100 -112.2300      18.8        42       142        60
OIR    2025250     91400   17.1100 -112.2400      18.9        41       142        60
OIR    2025250     91400   17.1100 -112.2500      18.9        41       142        60
OIR    2025250     91400   17.1100 -112.2600      19.0        41       143        60
OIR    2025250     91400   17.1100 -112.2700      19.0        41       144        60
OIR    2025250     91400   17.1100 -112.2800      19.0        41       144        60
OIR    2025250     91400   17.1100 -112.3000      19.0        41       144        60
OIR    2025250     91400   17.1100 -112.3100      19.1        41       143        60
OIR    2025250     91400   17.1100 -112.3200      19.1        41       142        60
OIR    2025250     91400   17.1100 -112.3300      19.1        41       142        60
OIR    2025250     91400   17.1100 -112.3400      19.1        41       142        60
OIR    2025250     91400   17.1100 -112.3500      19.1        41       141        60
OIR    2025250     91400   17.1100 -112.3600      19.2        41       141        60
OIR    2025250     91400   17.1100 -112.3700      19.2        41       141        60
OIR    2025250     91400   17.1100 -112.3800      19.2        41       143        60
OIR    2025250     91400   17.1100 -112.3900      19.3        41       144        60
OIR    2025250     91400   17.1100 -112.4000      19.3        41       144        60
OIR    2025250     91400   17.1100 -112.5600      19.6        41       143        60
OIR    2025250     91400   17.1100 -112.5700      19.6        41       141        60
OIR    2025250     91400   17.1100 -112.5800      19.6        41       142        60
OIR    2025250     91400   17.1100 -112.5900      19.7        41       143        60
OIR    2025250     91400   17.1100 -112.6000      19.8        41       143        60
OIR    2025250     91400   17.1100 -112.6100      20.0        41       143        60
OIR    2025250     91400   17.1100 -112.6200      20.1        41       145        60
OIR    2025250     91400   17.1000 -111.6700      17.8        46       146        60
OIR    2025250     91400   17.1000 -111.6800      17.9        47       144        60
OIR    2025250     91400   17.1000 -111.6900      18.1        47       142        60
OIR    2025250     91400   17.1000 -111.7000      18.1        47       139        60
OIR    2025250     91400   17.1000 -111.7100      18.0        48       137        60
OIR    2025250     91400   17.1000 -111.7200      17.8        48       135        60
OIR    2025250     91400   17.1000 -111.7300      17.4        48       133        60
OIR    2025250     91400   17.1000 -111.7400      17.2        48       130        60
OIR    2025250     91400   17.1000 -111.7500      17.1        48       130        60
OIR    2025250     91400   17.1000 -111.7600      17.0        47       128        60
OIR    2025250     91400   17.1000 -111.7700      17.0        47       129        60
OIR    2025250     91400   17.1000 -111.7800      16.9        47       129        60
OIR    2025250     91400   17.1000 -111.7900      16.9        47       129        60
OIR    2025250     91400   17.1000 -111.8000      16.9        47       128        60
OIR    2025250     91400   17.1000 -111.8100      16.9        47       127        60
OIR    2025250     91400   17.1000 -111.8200      16.9        47       127        60
OIR    2025250     91400   17.1000 -111.8300      16.9        47       128        60
OIR    2025250     91400   17.1000 -111.8400      16.9        47       127        60
OIR    2025250     91400   17.1000 -111.8500      16.9        47       127        60
OIR    2025250     91400   17.1000 -111.8600      16.9        47       127        60
OIR    2025250     91400   17.1000 -111.8700      16.9        47       128        60
OIR    2025250     91400   17.1000 -111.8800      16.9        47       128        60
OIR    2025250     91400   17.1000 -111.8900      16.9        47       127        60
OIR    2025250     91400   17.1000 -111.9000      16.9        47       126        60
OIR    2025250     91400   17.1000 -111.9100      17.0        47       128        60
OIR    2025250     91400   17.1000 -111.9200      17.0        47       130        60
OIR    2025250     91400   17.1000 -111.9300      17.0        47       131        60
OIR    2025250     91400   17.1000 -111.9400      17.1        47       131        60
OIR    2025250     91400   17.1000 -111.9500      17.1        47       131        60
OIR    2025250     91400   17.1000 -111.9600      17.2        47       130        60
OIR    2025250     91400   17.1000 -111.9700      17.4        47       130        60
OIR    2025250     91400   17.1000 -111.9800      17.5        47       132        60
OIR    2025250     91400   17.1000 -111.9900      17.5        46       134        60
OIR    2025250     91400   17.1000 -112.0000      17.6        46       135        60
OIR    2025250     91400   17.1000 -112.0100      17.6        46       136        60
OIR    2025250     91400   17.1000 -112.0200      17.6        46       137        60
OIR    2025250     91400   17.1000 -112.0300      17.6        46       137        60
OIR    2025250     91400   17.1000 -112.0400      17.6        46       138        60
OIR    2025250     91400   17.1000 -112.0500      17.6        46       138        60
OIR    2025250     91400   17.1000 -112.0600      17.7        46       138        60
OIR    2025250     91400   17.1000 -112.0700      17.7        46       139        60
OIR    2025250     91400   17.1000 -112.0800      17.8        46       139        60
OIR    2025250     91400   17.1000 -112.0900      17.8        45       140        60
OIR    2025250     91400   17.1000 -112.1000      17.9        45       139        60
OIR    2025250     91400   17.1000 -112.1100      17.9        45       139        60
OIR    2025250     91400   17.1000 -112.1200      17.9        45       138        60
OIR    2025250     91400   17.1000 -112.1300      18.0        44       138        60
OIR    2025250     91400   17.1000 -112.1400      18.1        44       139        60
OIR    2025250     91400   17.1000 -112.1500      18.2        44       142        60
OIR    2025250     91400   17.1000 -112.1600      18.3        44       143        60
OIR    2025250     91400   17.1000 -112.1700      18.4        43       143        60
OIR    2025250     91400   17.1000 -112.1800      18.5        43       142        60
OIR    2025250     91400   17.1000 -112.1900      18.6        43       144        60
OIR    2025250     91400   17.1000 -112.2100      18.8        42       144        60
OIR    2025250     91400   17.1000 -112.2200      18.8        42       142        60
OIR    2025250     91400   17.1000 -112.2300      18.9        41       142        60
OIR    2025250     91400   17.1000 -112.2400      18.9        41       142        60
OIR    2025250     91400   17.1000 -112.2500      19.0        41       141        60
OIR    2025250     91400   17.1000 -112.2600      19.0        41       143        60
OIR    2025250     91400   17.1000 -112.2700      19.0        41       144        60
OIR    2025250     91400   17.1000 -112.3100      19.1        41       144        60
OIR    2025250     91400   17.1000 -112.3200      19.1        41       143        60
OIR    2025250     91400   17.1000 -112.3300      19.1        41       144        60
OIR    2025250     91400   17.1000 -112.3400      19.1        41       144        60
OIR    2025250     91400   17.1000 -112.3500      19.2        41       144        60
OIR    2025250     91400   17.1000 -112.3600      19.2        41       142        60
OIR    2025250     91400   17.1000 -112.3700      19.2        41       140        60
OIR    2025250     91400   17.1000 -112.3800      19.3        41       140        60
OIR    2025250     91400   17.1000 -112.3900      19.3        41       140        60
OIR    2025250     91400   17.1000 -112.4000      19.3        41       141        60
OIR    2025250     91400   17.1000 -112.4100      19.3        41       141        60
OIR    2025250     91400   17.1000 -112.4200      19.3        41       144        60
OIR    2025250     91400   17.1000 -112.4800      19.4        41       144        60
OIR    2025250     91400   17.1000 -112.5500      19.5        41       144        60
OIR    2025250     91400   17.1000 -112.5600      19.6        41       144        60
OIR    2025250     91400   17.1000 -112.5700      19.6        41       144        60
OIR    2025250     91400   17.0900 -111.7000      18.2        47       143        60
OIR    2025250     91400   17.0900 -111.7100      18.2        47       137        60
OIR    2025250     91400   17.0900 -111.7200      18.0        48       132        60
OIR    2025250     91400   17.0900 -111.7300      17.7        48       130        60
OIR    2025250     91400   17.0900 -111.7400      17.3        48       128        60
OIR    2025250     91400   17.0900 -111.7500      17.2        47       129        60
OIR    2025250     91400   17.0900 -111.7600      17.1        47       130        60
OIR    2025250     91400   17.0900 -111.7700      17.0        47       131        60
OIR    2025250     91400   17.0900 -111.7800      17.0        47       131        60
OIR    2025250     91400   17.0900 -111.7900      16.9        47       131        60
OIR    2025250     91400   17.0900 -111.8000      16.9        47       129        60
OIR    2025250     91400   17.0900 -111.8100      16.9        47       128        60
OIR    2025250     91400   17.0900 -111.8200      16.9        47       129        60
OIR    2025250     91400   17.0900 -111.8300      16.9        47       130        60
OIR    2025250     91400   17.0900 -111.8400      16.9        47       130        60
OIR    2025250     91400   17.0900 -111.8500      17.0        47       127        60
OIR    2025250     91400   17.0900 -111.8600      17.0        46       127        60
OIR    2025250     91400   17.0900 -111.8700      17.0        46       128        60
OIR    2025250     91400   17.0900 -111.8800      17.0        46       129        60
OIR    2025250     91400   17.0900 -111.8900      16.9        46       128        60
OIR    2025250     91400   17.0900 -111.9000      17.0        46       127        60
OIR    2025250     91400   17.0900 -111.9100      17.0        47       127        60
OIR    2025250     91400   17.0900 -111.9200      17.0        47       129        60
OIR    2025250     91400   17.0900 -111.9300      17.0        47       131        60
OIR    2025250     91400   17.0900 -111.9400      17.1        47       131        60
OIR    2025250     91400   17.0900 -111.9500      17.2        47       132        60
OIR    2025250     91400   17.0900 -111.9600      17.3        46       131        60
OIR    2025250     91400   17.0900 -111.9700      17.4        46       130        60
OIR    2025250     91400   17.0900 -111.9800      17.5        46       132        60
OIR    2025250     91400   17.0900 -111.9900      17.5        46       135        60
OIR    2025250     91400   17.0900 -112.0000      17.6        46       137        60
OIR    2025250     91400   17.0900 -112.0100      17.6        46       137        60
OIR    2025250     91400   17.0900 -112.0200      17.6        46       137        60
OIR    2025250     91400   17.0900 -112.0300      17.6        46       138        60
OIR    2025250     91400   17.0900 -112.0400      17.7        46       138        60
OIR    2025250     91400   17.0900 -112.0500      17.7        46       139        60
OIR    2025250     91400   17.0900 -112.0600      17.7        46       140        60
OIR    2025250     91400   17.0900 -112.0700      17.8        46       140        60
OIR    2025250     91400   17.0900 -112.0800      17.8        45       139        60
OIR    2025250     91400   17.0900 -112.0900      17.9        45       139        60
OIR    2025250     91400   17.0900 -112.1000      17.9        45       140        60
OIR    2025250     91400   17.0900 -112.1100      17.9        45       142        60
OIR    2025250     91400   17.0900 -112.1200      18.0        45       141        60
OIR    2025250     91400   17.0900 -112.1300      18.1        44       138        60
OIR    2025250     91400   17.0900 -112.1400      18.1        44       138        60
OIR    2025250     91400   17.0900 -112.1500      18.2        44       140        60
OIR    2025250     91400   17.0900 -112.1600      18.3        43       141        60
OIR    2025250     91400   17.0900 -112.1700      18.4        43       141        60
OIR    2025250     91400   17.0900 -112.1800      18.5        43       141        60
OIR    2025250     91400   17.0900 -112.1900      18.6        43       141        60
OIR    2025250     91400   17.0900 -112.2000      18.7        42       142        60
OIR    2025250     91400   17.0900 -112.2100      18.8        42       143        60
OIR    2025250     91400   17.0900 -112.2200      18.9        42       144        60
OIR    2025250     91400   17.0900 -112.3500      19.2        41       144        60
OIR    2025250     91400   17.0900 -112.3600      19.2        41       142        60
OIR    2025250     91400   17.0900 -112.3700      19.2        41       141        60
OIR    2025250     91400   17.0900 -112.3800      19.3        41       141        60
OIR    2025250     91400   17.0900 -112.3900      19.3        41       141        60
OIR    2025250     91400   17.0900 -112.4000      19.3        41       140        60
OIR    2025250     91400   17.0900 -112.4100      19.3        41       140        60
OIR    2025250     91400   17.0900 -112.4200      19.3        41       142        60
OIR    2025250     91400   17.0900 -112.4800      19.4        41       144        60
OIR    2025250     91400   17.0900 -112.5500      19.5        41       144        60
OIR    2025250     91400   17.0800 -111.7100      18.3        47       137        60
OIR    2025250     91400   17.0800 -111.7200      18.2        47       129        60
OIR    2025250     91400   17.0800 -111.7300      17.9        47       127        60
OIR    2025250     91400   17.0800 -111.7400      17.4        47       125        60
OIR    2025250     91400   17.0800 -111.7500      17.2        47       126        60
OIR    2025250     91400   17.0800 -111.7600      17.1        47       129        60
OIR    2025250     91400   17.0800 -111.7700      17.1        47       132        60
OIR    2025250     91400   17.0800 -111.7800      17.0        47       134        60
OIR    2025250     91400   17.0800 -111.7900      17.0        47       136        60
OIR    2025250     91400   17.0800 -111.8000      17.0        47       133        60
OIR    2025250     91400   17.0800 -111.8100      17.0        47       131        60
OIR    2025250     91400   17.0800 -111.8200      17.0        47       131        60
OIR    2025250     91400   17.0800 -111.8300      17.0        47       132        60
OIR    2025250     91400   17.0800 -111.8400      17.0        46       132        60
OIR    2025250     91400   17.0800 -111.8500      17.0        46       128        60
OIR    2025250     91400   17.0800 -111.8600      17.0        46       125        60
OIR    2025250     91400   17.0800 -111.8700      17.0        46       129        60
OIR    2025250     91400   17.0800 -111.8800      17.0        46       132        60
OIR    2025250     91400   17.0800 -111.8900      17.0        46       131        60
OIR    2025250     91400   17.0800 -111.9000      17.0        46       130        60
OIR    2025250     91400   17.0800 -111.9100      17.0        46       129        60
OIR    2025250     91400   17.0800 -111.9200      17.0        46       130        60
OIR    2025250     91400   17.0800 -111.9300      17.1        46       130        60
OIR    2025250     91400   17.0800 -111.9400      17.1        46       132        60
OIR    2025250     91400   17.0800 -111.9500      17.2        46       133        60
OIR    2025250     91400   17.0800 -111.9600      17.3        46       132        60
OIR    2025250     91400   17.0800 -111.9700      17.4        46       130        60
OIR    2025250     91400   17.0800 -111.9800      17.5        46       131        60
OIR    2025250     91400   17.0800 -111.9900      17.6        46       134        60
OIR    2025250     91400   17.0800 -112.0000      17.6        46       136        60
OIR    2025250     91400   17.0800 -112.0100      17.6        46       137        60
OIR    2025250     91400   17.0800 -112.0200      17.7        46       138        60
OIR    2025250     91400   17.0800 -112.0300      17.7        46       139        60
OIR    2025250     91400   17.0800 -112.0400      17.7        46       139        60
OIR    2025250     91400   17.0800 -112.0500      17.7        46       140        60
OIR    2025250     91400   17.0800 -112.0600      17.8        46       142        60
OIR    2025250     91400   17.0800 -112.0700      17.8        45       143        60
OIR    2025250     91400   17.0800 -112.0800      17.8        45       142        60
OIR    2025250     91400   17.0800 -112.0900      17.9        45       141        60
OIR    2025250     91400   17.0800 -112.1000      17.9        45       142        60
OIR    2025250     91400   17.0800 -112.1100      18.0        45       142        60
OIR    2025250     91400   17.0800 -112.1200      18.0        44       142        60
OIR    2025250     91400   17.0800 -112.1300      18.1        44       140        60
OIR    2025250     91400   17.0800 -112.1400      18.2        44       139        60
OIR    2025250     91400   17.0800 -112.1500      18.3        43       140        60
OIR    2025250     91400   17.0800 -112.1600      18.4        43       141        60
OIR    2025250     91400   17.0800 -112.1700      18.5        43       141        60
OIR    2025250     91400   17.0800 -112.1800      18.6        43       140        60
OIR    2025250     91400   17.0800 -112.1900      18.7        42       140        60
OIR    2025250     91400   17.0800 -112.2000      18.8        42       141        60
OIR    2025250     91400   17.0800 -112.2100      18.9        42       142        60
OIR    2025250     91400   17.0800 -112.3500      19.2        41       144        60
OIR    2025250     91400   17.0800 -112.3600      19.2        41       142        60
OIR    2025250     91400   17.0800 -112.3700      19.2        41       141        60
OIR    2025250     91400   17.0800 -112.3800      19.3        41       142        60
OIR    2025250     91400   17.0800 -112.3900      19.3        41       143        60
OIR    2025250     91400   17.0800 -112.4000      19.3        41       142        60
OIR    2025250     91400   17.0800 -112.4100      19.3        41       139        60
OIR    2025250     91400   17.0800 -112.4200      19.4        41       140        60
OIR    2025250     91400   17.0700 -111.7200      18.3        47       135        60
OIR    2025250     91400   17.0700 -111.7300      18.0        47       132        60
OIR    2025250     91400   17.0700 -111.7400      17.4        47       130        60
OIR    2025250     91400   17.0700 -111.7500      17.2        47       130        60
OIR    2025250     91400   17.0700 -111.7600      17.1        47       133        60
OIR    2025250     91400   17.0700 -111.7700      17.1        47       136        60
OIR    2025250     91400   17.0700 -111.7800      17.1        47       137        60
OIR    2025250     91400   17.0700 -111.7900      17.0        47       138        60
OIR    2025250     91400   17.0700 -111.8000      17.0        47       137        60
OIR    2025250     91400   17.0700 -111.8100      17.0        47       135        60
OIR    2025250     91400   17.0700 -111.8200      17.0        46       135        60
OIR    2025250     91400   17.0700 -111.8300      17.0        46       135        60
OIR    2025250     91400   17.0700 -111.8400      17.0        46       135        60
OIR    2025250     91400   17.0700 -111.8500      17.0        46       130        60
OIR    2025250     91400   17.0700 -111.8600      17.0        46       126        60
OIR    2025250     91400   17.0700 -111.8700      17.0        46       129        60
OIR    2025250     91400   17.0700 -111.8800      17.0        46       133        60
OIR    2025250     91400   17.0700 -111.8900      17.0        46       134        60
OIR    2025250     91400   17.0700 -111.9000      17.0        46       132        60
OIR    2025250     91400   17.0700 -111.9100      17.0        46       132        60
OIR    2025250     91400   17.0700 -111.9200      17.0        46       131        60
OIR    2025250     91400   17.0700 -111.9300      17.1        46       131        60
OIR    2025250     91400   17.0700 -111.9400      17.2        46       132        60
OIR    2025250     91400   17.0700 -111.9500      17.2        46       133        60
OIR    2025250     91400   17.0700 -111.9600      17.3        46       133        60
OIR    2025250     91400   17.0700 -111.9700      17.4        46       131        60
OIR    2025250     91400   17.0700 -111.9800      17.5        46       131        60
OIR    2025250     91400   17.0700 -111.9900      17.6        46       133        60
OIR    2025250     91400   17.0700 -112.0000      17.6        46       135        60
OIR    2025250     91400   17.0700 -112.0100      17.7        46       137        60
OIR    2025250     91400   17.0700 -112.0200      17.7        46       139        60
OIR    2025250     91400   17.0700 -112.0300      17.7        46       140        60
OIR    2025250     91400   17.0700 -112.0400      17.8        46       140        60
OIR    2025250     91400   17.0700 -112.0500      17.8        46       140        60
OIR    2025250     91400   17.0700 -112.0600      17.8        45       143        60
OIR    2025250     91400   17.0700 -112.1000      18.0        45       143        60
OIR    2025250     91400   17.0700 -112.1100      18.0        44       142        60
OIR    2025250     91400   17.0700 -112.1200      18.1        44       141        60
OIR    2025250     91400   17.0700 -112.1300      18.2        44       140        60
OIR    2025250     91400   17.0700 -112.1400      18.3        44       140        60
OIR    2025250     91400   17.0700 -112.1500      18.4        43       142        60
OIR    2025250     91400   17.0700 -112.1600      18.4        43       145        60
OIR    2025250     91400   17.0700 -112.1700      18.5        43       144        60
OIR    2025250     91400   17.0700 -112.1800      18.6        43       142        60
OIR    2025250     91400   17.0700 -112.1900      18.7        42       142        60
OIR    2025250     91400   17.0700 -112.2000      18.8        42       143        60
OIR    2025250     91400   17.0700 -112.3700      19.2        41       142        60
OIR    2025250     91400   17.0700 -112.3800      19.3        41       141        60
OIR    2025250     91400   17.0700 -112.3900      19.3        41       140        60
OIR    2025250     91400   17.0700 -112.4000      19.3        41       140        60
OIR    2025250     91400   17.0700 -112.4100      19.3        41       141        60
OIR    2025250     91400   17.0700 -112.4200      19.4        41       142        60
OIR    2025250     91400   17.0700 -112.4300      19.4        41       144        60
OIR    2025250     91400   17.0600 -111.7300      17.8        47       143        60
OIR    2025250     91400   17.0600 -111.7400      17.4        47       139        60
OIR    2025250     91400   17.0600 -111.7500      17.2        46       138        60
OIR    2025250     91400   17.0600 -111.7600      17.1        46       141        60
OIR    2025250     91400   17.0600 -111.7700      17.1        46       144        60
OIR    2025250     91400   17.0600 -111.7800      17.1        46       142        60
OIR    2025250     91400   17.0600 -111.7900      17.0        46       138        60
OIR    2025250     91400   17.0600 -111.8000      17.0        46       137        60
OIR    2025250     91400   17.0600 -111.8100      17.0        46       139        60
OIR    2025250     91400   17.0600 -111.8200      17.0        46       140        60
OIR    2025250     91400   17.0600 -111.8300      17.0        46       139        60
OIR    2025250     91400   17.0600 -111.8400      17.0        46       138        60
OIR    2025250     91400   17.0600 -111.8500      17.0        46       134        60
OIR    2025250     91400   17.0600 -111.8600      17.0        46       130        60
OIR    2025250     91400   17.0600 -111.8700      17.0        46       130        60
OIR    2025250     91400   17.0600 -111.8800      17.0        46       133        60
OIR    2025250     91400   17.0600 -111.8900      17.0        46       135        60
OIR    2025250     91400   17.0600 -111.9000      17.0        46       134        60
OIR    2025250     91400   17.0600 -111.9100      17.0        46       134        60
OIR    2025250     91400   17.0600 -111.9200      17.1        46       134        60
OIR    2025250     91400   17.0600 -111.9300      17.1        46       133        60
OIR    2025250     91400   17.0600 -111.9400      17.2        46       133        60
OIR    2025250     91400   17.0600 -111.9500      17.3        46       133        60
OIR    2025250     91400   17.0600 -111.9600      17.4        46       132        60
OIR    2025250     91400   17.0600 -111.9700      17.5        46       132        60
OIR    2025250     91400   17.0600 -111.9800      17.6        46       132        60
OIR    2025250     91400   17.0600 -111.9900      17.6        46       135        60
OIR    2025250     91400   17.0600 -112.0000      17.7        46       138        60
OIR    2025250     91400   17.0600 -112.0100      17.7        46       139        60
OIR    2025250     91400   17.0600 -112.0200      17.8        46       140        60
OIR    2025250     91400   17.0600 -112.0300      17.8        46       141        60
OIR    2025250     91400   17.0600 -112.0400      17.8        45       142        60
OIR    2025250     91400   17.0600 -112.0500      17.8        45       143        60
OIR    2025250     91400   17.0600 -112.0600      17.9        45       143        60
OIR    2025250     91400   17.0600 -112.0700      17.9        45       144        60
OIR    2025250     91400   17.0600 -112.0800      17.9        45       144        60
OIR    2025250     91400   17.0600 -112.0900      18.0        45       144        60
OIR    2025250     91400   17.0600 -112.1000      18.0        45       143        60
OIR    2025250     91400   17.0600 -112.1100      18.1        44       143        60
OIR    2025250     91400   17.0600 -112.1200      18.2        44       142        60
OIR    2025250     91400   17.0600 -112.1300      18.3        44       141        60
OIR    2025250     91400   17.0600 -112.1400      18.3        43       141        60
OIR    2025250     91400   17.0600 -112.1500      18.4        43       143        60
OIR    2025250     91400   17.0600 -112.1600      18.5        43       144        60
OIR    2025250     91400   17.0600 -112.1800      18.7        42       144        60
OIR    2025250     91400   17.0600 -112.1900      18.8        42       144        60
OIR    2025250     91400   17.0600 -112.3800      19.3        41       141        60
OIR    2025250     91400   17.0600 -112.3900      19.3        41       136        60
OIR    2025250     91400   17.0600 -112.4000      19.3        41       137        60
OIR    2025250     91400   17.0600 -112.4100      19.3        41       141        60
OIR    2025250     91400   17.0600 -112.4200      19.4        41       144        60
OIR    2025250     91400   17.0600 -112.5500      19.6        41       145        60
OIR    2025250     91400   17.0600 -112.5600      19.6        41       144        60
OIR    2025250     91400   17.0500 -111.8000      17.1        46       142        60
OIR    2025250     91400   17.0500 -111.8100      17.1        46       144        60
OIR    2025250     91400   17.0500 -111.8300      17.0        46       143        60
OIR    2025250     91400   17.0500 -111.8400      17.1        45       142        60
OIR    2025250     91400   17.0500 -111.8500      17.1        46       139        60
OIR    2025250     91400   17.0500 -111.8600      17.1        46       136        60
OIR    2025250     91400   17.0500 -111.8700      17.1        45       134        60
OIR    2025250     91400   17.0500 -111.8800      17.1        45       136        60
OIR    2025250     91400   17.0500 -111.8900      17.1        45       138        60
OIR    2025250     91400   17.0500 -111.9000      17.1        45       137        60
OIR    2025250     91400   17.0500 -111.9100      17.1        45       135        60
OIR    2025250     91400   17.0500 -111.9200      17.1        45       136        60
OIR    2025250     91400   17.0500 -111.9300      17.2        45       136        60
OIR    2025250     91400   17.0500 -111.9400      17.2        45       135        60
OIR    2025250     91400   17.0500 -111.9500      17.3        46       133        60
OIR    2025250     91400   17.0500 -111.9600      17.4        46       132        60
OIR    2025250     91400   17.0500 -111.9700      17.5        46       132        60
OIR    2025250     91400   17.0500 -111.9800      17.6        46       132        60
OIR    2025250     91400   17.0500 -111.9900      17.7        46       136        60
OIR    2025250     91400   17.0500 -112.0000      17.7        46       140        60
OIR    2025250     91400   17.0500 -112.0100      17.8        46       142        60
OIR    2025250     91400   17.0500 -112.0200      17.8        46       142        60
OIR    2025250     91400   17.0500 -112.0300      17.8        45       143        60
OIR    2025250     91400   17.0500 -112.0700      17.9        45       142        60
OIR    2025250     91400   17.0500 -112.0800      18.0        45       141        60
OIR    2025250     91400   17.0500 -112.0900      18.0        45       141        60
OIR    2025250     91400   17.0500 -112.1000      18.1        44       142        60
OIR    2025250     91400   17.0500 -112.1100      18.1        44       144        60
OIR    2025250     91400   17.0500 -112.1300      18.3        44       144        60
OIR    2025250     91400   17.0500 -112.1400      18.4        43       142        60
OIR    2025250     91400   17.0500 -112.1500      18.4        43       142        60
OIR    2025250     91400   17.0500 -112.1600      18.5        43       142        60
OIR    2025250     91400   17.0500 -112.1700      18.6        43       143        60
OIR    2025250     91400   17.0500 -112.3800      19.3        41       143        60
OIR    2025250     91400   17.0500 -112.3900      19.3        41       138        60
OIR    2025250     91400   17.0500 -112.4000      19.3        41       137        60
OIR    2025250     91400   17.0500 -112.4100      19.4        41       140        60
OIR    2025250     91400   17.0500 -112.4200      19.4        41       143        60
OIR    2025250     91400   17.0500 -112.4300      19.4        41       144        60
OIR    2025250     91400   17.0500 -112.5100      19.5        41       144        60
OIR    2025250     91400   17.0500 -112.5600      19.6        41       143        60
OIR    2025250     91400   17.0500 -112.5700      19.7        41       144        60
OIR    2025250     91400   17.0500 -112.6200      20.3        41       144        60
OIR    2025250     91400   17.0500 -112.6300      20.4        41       143        60
OIR    2025250     91400   17.0400 -111.8400      17.1        45       144        60
OIR    2025250     91400   17.0400 -111.8500      17.1        45       144        60
OIR    2025250     91400   17.0400 -111.8600      17.1        45       144        60
OIR    2025250     91400   17.0400 -111.8800      17.2        45       144        60
OIR    2025250     91400   17.0400 -111.8900      17.2        44       144        60
OIR    2025250     91400   17.0400 -111.9000      17.2        44       141        60
OIR    2025250     91400   17.0400 -111.9100      17.2        44       138        60
OIR    2025250     91400   17.0400 -111.9200      17.2        45       137        60
OIR    2025250     91400   17.0400 -111.9300      17.2        45       138        60
OIR    2025250     91400   17.0400 -111.9400      17.3        45       137        60
OIR    2025250     91400   17.0400 -111.9500      17.4        45       134        60
OIR    2025250     91400   17.0400 -111.9600      17.4        45       132        60
OIR    2025250     91400   17.0400 -111.9700      17.5        45       133        60
OIR    2025250     91400   17.0400 -111.9800      17.6        45       134        60
OIR    2025250     91400   17.0400 -111.9900      17.7        45       136        60
OIR    2025250     91400   17.0400 -112.0000      17.7        45       140        60
OIR    2025250     91400   17.0400 -112.0100      17.8        45       143        60
OIR    2025250     91400   17.0400 -112.0200      17.9        45       144        60
OIR    2025250     91400   17.0400 -112.0800      18.0        45       144        60
OIR    2025250     91400   17.0400 -112.0900      18.1        44       143        60
OIR    2025250     91400   17.0400 -112.1000      18.2        44       143        60
OIR    2025250     91400   17.0400 -112.1600      18.6        43       144        60
OIR    2025250     91400   17.0400 -112.1700      18.7        42       143        60
OIR    2025250     91400   17.0400 -112.3900      19.3        41       141        60
OIR    2025250     91400   17.0400 -112.4000      19.3        41       137        60
OIR    2025250     91400   17.0400 -112.4100      19.4        41       139        60
OIR    2025250     91400   17.0400 -112.4200      19.4        41       140        60
OIR    2025250     91400   17.0400 -112.4300      19.4        41       142        60
OIR    2025250     91400   17.0400 -112.4400      19.4        41       144        60
OIR    2025250     91400   17.0400 -112.5400      19.6        41       145        60
OIR    2025250     91400   17.0400 -112.5700      19.7        41       144        60
OIR    2025250     91400   17.0400 -112.5800      19.8        41       143        60
OIR    2025250     91400   17.0400 -112.5900      19.9        41       143        60
OIR    2025250     91400   17.0400 -112.6000      20.0        41       144        60
OIR    2025250     91400   17.0400 -112.6100      20.2        41       144        60
OIR    2025250     91400   17.0300 -111.9100      17.2        44       142        60
OIR    2025250     91400   17.0300 -111.9200      17.3        44       139        60
OIR    2025250     91400   17.0300 -111.9300      17.3        44       139        60
OIR    2025250     91400   17.0300 -111.9400      17.3        44       139        60
OIR    2025250     91400   17.0300 -111.9500      17.4        45       136        60
OIR    2025250     91400   17.0300 -111.9600      17.5        45       132        60
OIR    2025250     91400   17.0300 -111.9700      17.6        45       133        60
OIR    2025250     91400   17.0300 -111.9800      17.6        45       135        60
OIR    2025250     91400   17.0300 -111.9900      17.7        45       137        60
OIR    2025250     91400   17.0300 -112.0000      17.8        45       141        60
OIR    2025250     91400   17.0300 -112.0100      17.8        45       144        60
OIR    2025250     91400   17.0300 -112.3900      19.3        41       144        60
OIR    2025250     91400   17.0300 -112.4000      19.3        41       141        60
OIR    2025250     91400   17.0300 -112.4100      19.4        41       141        60
OIR    2025250     91400   17.0300 -112.4200      19.4        41       141        60
OIR    2025250     91400   17.0300 -112.4300      19.4        41       143        60
OIR    2025250     91400   17.0300 -112.5400      19.6        41       144        60
OIR    2025250     91400   17.0300 -112.5800      19.8        41       143        60
OIR    2025250     91400   17.0300 -112.5900      19.9        41       141        60
OIR    2025250     91400   17.0300 -112.6000      20.0        41       142        60
OIR    2025250     91400   17.0300 -112.6100      20.2        41       142        60
OIR    2025250     91400   17.0300 -112.6200      20.3        41       144        60
OIR    2025250     91400   17.0200 -111.9100      17.3        44       144        60
OIR    2025250     91400   17.0200 -111.9200      17.3        44       141        60
OIR    2025250     91400   17.0200 -111.9300      17.3        44       140        60
OIR    2025250     91400   17.0200 -111.9400      17.4        44       139        60
OIR    2025250     91400   17.0200 -111.9500      17.4        44       137        60
OIR    2025250     91400   17.0200 -111.9600      17.5        44       136        60
OIR    2025250     91400   17.0200 -111.9700      17.6        44       135        60
OIR    2025250     91400   17.0200 -111.9800      17.6        45       136        60
OIR    2025250     91400   17.0200 -111.9900      17.7        45       137        60
OIR    2025250     91400   17.0200 -112.0000      17.8        45       141        60
OIR    2025250     91400   17.0200 -112.0100      17.9        45       144        60
OIR    2025250     91400   17.0200 -112.4100      19.4        41       144        60
OIR    2025250     91400   17.0200 -112.4200      19.4        41       143        60
OIR    2025250     91400   17.0200 -112.4300      19.4        41       144        60
OIR    2025250     91400   17.0200 -112.5600      19.7        41       144        60
OIR    2025250     91400   17.0200 -112.5700      19.8        41       144        60
OIR    2025250     91400   17.0200 -112.5800      19.9        41       144        60
OIR    2025250     91400   17.0200 -112.5900      20.0        41       144        60
OIR    2025250     91400   17.0200 -112.6000      20.1        41       144        60
OIR    2025250     91400   17.0200 -112.6100      20.2        41       143        60
OIR    2025250     91400   17.0200 -112.6200      20.3        41       143        60
OIR    2025250     91400   17.0200 -112.6300      20.6        41       144        60
OIR    2025250     91400   17.0100 -111.9200      17.4        44       142        60
OIR    2025250     91400   17.0100 -111.9300      17.4        44       141        60
OIR    2025250     91400   17.0100 -111.9400      17.4        44       139        60
OIR    2025250     91400   17.0100 -111.9500      17.5        44       139        60
OIR    2025250     91400   17.0100 -111.9600      17.5        44       138        60
OIR    2025250     91400   17.0100 -111.9700      17.6        44       138        60
OIR    2025250     91400   17.0100 -111.9800      17.7        44       138        60
OIR    2025250     91400   17.0100 -111.9900      17.7        44       138        60
OIR    2025250     91400   17.0100 -112.0000      17.8        45       141        60
OIR    2025250     91400   17.0100 -112.0100      17.9        45       143        60
OIR    2025250     91400   17.0100 -112.5600      19.7        41       144        60
OIR    2025250     91400   17.0100 -112.5700      19.8        41       144        60
OIR    2025250     91400   17.0100 -112.6200      20.4        41       144        60
OIR    2025250     91400   17.0100 -112.6300      20.7        41       142        60
OIR    2025250     91400   17.0100 -112.6400      21.0        42       142        60
OIR    2025250     91400   17.0100 -112.6500      21.3        42       144        60
OIR    2025250     91400   17.0000 -111.9200      17.5        43       141        60
OIR    2025250     91400   17.0000 -111.9300      17.5        43       141        60
OIR    2025250     91400   17.0000 -111.9400      17.5        43       141        60
OIR    2025250     91400   17.0000 -111.9500      17.5        44       141        60
OIR    2025250     91400   17.0000 -111.9600      17.6        44       140        60
OIR    2025250     91400   17.0000 -111.9700      17.6        44       139        60
OIR    2025250     91400   17.0000 -111.9800      17.7        44       138        60
OIR    2025250     91400   17.0000 -111.9900      17.8        44       137        60
OIR    2025250     91400   17.0000 -112.0000      17.8        44       140        60
OIR    2025250     91400   17.0000 -112.0100      17.9        44       142        60
OIR    2025250     91400   17.0000 -112.5700      19.8        41       143        60
OIR    2025250     91400   17.0000 -112.5800      19.9        41       145        60
OIR    2025250     91400   17.0000 -112.6200      20.6        41       144        60
OIR    2025250     91400   17.0000 -112.6300      20.9        42       143        60
OIR    2025250     91400   17.0000 -112.6400      21.2        42       141        60
OIR    2025250     91400   17.0000 -112.6500      21.4        42       143        60
OIR    2025250     91400   16.9900 -111.9200      17.5        43       141        60
OIR    2025250     91400   16.9900 -111.9300      17.5        43       141        60
OIR    2025250     91400   16.9900 -111.9400      17.6        43       142        60
OIR    2025250     91400   16.9900 -111.9500      17.6        43       142        60
OIR    2025250     91400   16.9900 -111.9600      17.6        43       142        60
OIR    2025250     91400   16.9900 -111.9700      17.6        44       141        60
OIR    2025250     91400   16.9900 -111.9800      17.7        44       140        60
OIR    2025250     91400   16.9900 -111.9900      17.8        44       138        60
OIR    2025250     91400   16.9900 -112.0000      17.8        44       139        60
OIR    2025250     91400   16.9900 -112.0100      17.9        44       142        60
OIR    2025250     91400   16.9900 -112.0200      18.0        44       144        60
OIR    2025250     91400   16.9900 -112.5700      19.8        41       144        60
OIR    2025250     91400   16.9900 -112.5800      19.9        41       145        60
OIR    2025250     91400   16.9900 -112.6200      20.7        42       144        60
OIR    2025250     91400   16.9900 -112.6300      21.1        42       142        60
OIR    2025250     91400   16.9900 -112.6400      21.4        42       141        60
OIR    2025250     91400   16.9900 -112.6500      21.5        42       142        60
OIR    2025250     91400   16.9900 -112.6600      21.6        42       144        60
OIR    2025250     91400   16.9800 -111.9300      17.6        43       142        60
OIR    2025250     91400   16.9800 -111.9400      17.6        43       141        60
OIR    2025250     91400   16.9800 -111.9500      17.6        43       141        60
OIR    2025250     91400   16.9800 -111.9600      17.6        43       141        60
OIR    2025250     91400   16.9800 -111.9700      17.7        43       142        60
OIR    2025250     91400   16.9800 -111.9800      17.7        44       142        60
OIR    2025250     91400   16.9800 -111.9900      17.8        44       141        60
OIR    2025250     91400   16.9800 -112.0000      17.9        44       142        60
OIR    2025250     91400   16.9800 -112.0100      18.0        44       144        60
OIR    2025250     91400   16.9800 -112.5900      20.0        41       144        60
OIR    2025250     91400   16.9800 -112.6000      20.2        41       143        60
OIR    2025250     91400   16.9800 -112.6100      20.5        41       143        60
OIR    2025250     91400   16.9800 -112.6200      20.9        42       142        60
OIR    2025250     91400   16.9800 -112.6300      21.3        42       140        60
OIR    2025250     91400   16.9800 -112.6400      21.5        42       139        60
OIR    2025250     91400   16.9800 -112.6500      21.6        42       142        60
OIR    2025250     91400   16.9700 -111.9300      17.6        43       144        60
OIR    2025250     91400   16.9700 -111.9400      17.6        43       141        60
OIR    2025250     91400   16.9700 -111.9500      17.6        43       139        60
OIR    2025250     91400   16.9700 -111.9600      17.7        43       141        60
OIR    2025250     91400   16.9700 -111.9700      17.7        43       143        60
OIR    2025250     91400   16.9700 -111.9800      17.7        43       144        60
OIR    2025250     91400   16.9700 -111.9900      17.8        44       144        60
OIR    2025250     91400   16.9700 -112.0000      17.9        44       144        60
OIR    2025250     91400   16.9700 -112.6000      20.3        41       143        60
OIR    2025250     91400   16.9700 -112.6100      20.6        41       143        60
OIR    2025250     91400   16.9700 -112.6200      21.1        42       142        60
OIR    2025250     91400   16.9700 -112.6300      21.4        42       140        60
OIR    2025250     91400   16.9700 -112.6400      21.6        42       138        60
OIR    2025250     91400   16.9700 -112.6500      21.6        42       141        60
OIR    2025250     91400   16.9600 -111.9400      17.7        43       144        60
OIR    2025250     91400   16.9600 -111.9500      17.7        43       142        60
OIR    2025250     91400   16.9600 -111.9600      17.7        43       142        60
OIR    2025250     91400   16.9600 -111.9700      17.7        43       143        60
OIR    2025250     91400   16.9600 -111.9800      17.8        43       143        60
OIR    2025250     91400   16.9600 -111.9900      17.9        43       143        60
OIR    2025250     91400   16.9600 -112.0000      17.9        43       143        60
OIR    2025250     91400   16.9600 -112.6300      21.5        42       141        60
OIR    2025250     91400   16.9600 -112.6400      21.6        42       137        60
OIR    2025250     91400   16.9600 -112.6500      21.7        42       138        60
OIR    2025250     91400   16.9600 -112.6600      21.7        42       143        60
OIR    2025250     91400   16.9500 -111.9800      17.8        43       144        60
OIR    2025250     91400   16.9500 -111.9900      17.9        43       143        60
OIR    2025250     91400   16.9500 -112.0000      17.9        43       141        60
OIR    2025250     91400   16.9500 -112.0100      18.1        43       144        60
OIR    2025250     91400   16.9500 -112.6300      21.5        42       143        60
OIR    2025250     91400   16.9500 -112.6400      21.6        42       139        60
OIR    2025250     91400   16.9500 -112.6500      21.7        42       137        60
OIR    2025250     91400   16.9500 -112.6600      21.7        42       142        60
OIR    2025250     91400   16.9400 -112.0000      18.0        43       144        60
OIR    2025250     91400   16.9400 -112.6200      21.4        42       141        60
OIR    2025250     91400   16.9400 -112.6300      21.6        42       139        60
OIR    2025250     91400   16.9400 -112.6400      21.7        42       140        60
OIR    2025250     91400   16.9400 -112.6500      21.7        42       142        60
OIR    2025250     91400   16.9400 -113.0300      22.1        40       144        60
OIR    2025250     91400   16.9400 -113.0400      21.9        40       144        60
OIR    2025250     91400   16.9300 -112.6100      21.2        42       145        60
OIR    2025250     91400   16.9300 -112.6200      21.4        42       140        60
OIR    2025250     91400   16.9300 -112.6300      21.6        42       135        60
OIR    2025250     91400   16.9300 -112.6400      21.7        42       140        60
OIR    2025250     91400   16.9300 -113.0400      21.9        40       142        60
OIR    2025250     91400   16.9200 -112.6200      21.5        42       142        60
OIR    2025250     91400   16.9200 -112.6300      21.6        42       139        60
OIR    2025250     91400   16.9200 -112.6400      21.7        42       142        60
OIR    2025250     91400   16.9200 -112.6600      21.8        42       144        60
OIR    2025250     91400   16.9200 -112.6700      21.9        42       142        60
OIR    2025250     91400   16.9200 -112.6800      21.9        42       142        60
OIR    2025250     91400   16.9200 -113.0400      21.9        40       144        60
OIR    2025250     91400   16.9100 -112.6300      21.6        42       143        60
OIR    2025250     91400   16.9100 -112.6400      21.7        42       145        60
OIR    2025250     91400   16.9100 -112.6600      21.9        42       144        60
OIR    2025250     91400   16.9100 -112.6700      21.9        42       140        60
OIR    2025250     91400   16.9100 -112.6800      22.0        42       136        60
OIR    2025250     91400   16.9100 -112.6900      22.0        42       144        60
OIR    2025250     91400   16.9000 -112.6700      22.0        42       144        60
OIR    2025250     91400   16.9000 -112.6800      22.0        42       142        60
OIR    2025250     91400   16.8600 -113.7600      16.6        19       145        60
OIR    2025250     91400   16.8600 -113.7700      16.3        19       142        60
OIR    2025250     91400   16.8600 -113.7800      16.2        19       140        60
OIR    2025250     91400   16.8600 -113.7900      15.9        20       144        60
OIR    2025250     91400   16.8600 -113.8500      11.9        20       143        60
OIR    2025250     91400   16.8500 -113.7100      19.5        18       143        60
OIR    2025250     91400   16.8500 -113.7200      19.5        16       143        60
OIR    2025250     91400   16.8500 -113.7300      19.3        16       143        60
OIR    2025250     91400   16.8500 -113.7400      17.9        16       143        60
OIR    2025250     91400   16.8500 -113.7500      17.0        17       139        60
OIR    2025250     91400   16.8500 -113.7600      16.7        18       134        60
OIR    2025250     91400   16.8500 -113.7700      16.3        19       133        60
OIR    2025250     91400   16.8500 -113.7800      16.1        19       131        60
OIR    2025250     91400   16.8500 -113.7900      15.9        20       135        60
OIR    2025250     91400   16.8500 -113.8000      15.5        20       140        60
OIR    2025250     91400   16.8500 -113.8100      12.7        20       144        60
OIR    2025250     91400   16.8400 -113.6900      18.5        24       138        60
OIR    2025250     91400   16.8400 -113.7000      18.6        21       133        60
OIR    2025250     91400   16.8400 -113.7100      19.4        18       131        60
OIR    2025250     91400   16.8400 -113.7200      19.5        16       131        60
OIR    2025250     91400   16.8400 -113.7300      19.5        16       133        60
OIR    2025250     91400   16.8400 -113.7400      17.8        15       134        60
OIR    2025250     91400   16.8400 -113.7500      17.1        17       130        60
OIR    2025250     91400   16.8400 -113.7600      17.0        17       126        60
OIR    2025250     91400   16.8400 -113.7700      16.5        18       125        60
OIR    2025250     91400   16.8400 -113.7800      16.2        19       125        60
OIR    2025250     91400   16.8400 -113.7900      15.8        19       128        60
OIR    2025250     91400   16.8400 -113.8000      15.0        19       132        60
OIR    2025250     91400   16.8400 -113.8100      12.7        19       138        60
OIR    2025250     91400   16.8400 -113.8200      12.2        20       144        60
OIR    2025250     91400   16.8300 -113.6900      18.6        25       137        60
OIR    2025250     91400   16.8300 -113.7000      18.9        19       128        60
OIR    2025250     91400   16.8300 -113.7100      19.1        18       126        60
OIR    2025250     91400   16.8300 -113.7200      19.3        16       126        60
OIR    2025250     91400   16.8300 -113.7300      19.3        16       128        60
OIR    2025250     91400   16.8300 -113.7400      17.5        15       129        60
OIR    2025250     91400   16.8300 -113.7500      17.0        17       127        60
OIR    2025250     91400   16.8300 -113.7600      16.8        17       125        60
OIR    2025250     91400   16.8300 -113.7700      16.5        18       125        60
OIR    2025250     91400   16.8300 -113.7800      16.1        19       124        60
OIR    2025250     91400   16.8300 -113.7900      15.7        19       126        60
OIR    2025250     91400   16.8300 -113.8000      14.8        19       129        60
OIR    2025250     91400   16.8300 -113.8100      13.3        20       132        60
OIR    2025250     91400   16.8300 -113.8200      12.7        21       138        60
OIR    2025250     91400   16.8300 -113.8300      12.2        22       144        60
OIR    2025250     91400   16.8200 -112.6400      22.0        41       145        60
OIR    2025250     91400   16.8200 -112.6500      22.1        41       142        60
OIR    2025250     91400   16.8200 -112.6600      22.1        42       143        60
OIR    2025250     91400   16.8200 -112.6700      22.2        42       144        60
OIR    2025250     91400   16.8200 -113.6900      19.2        26       137        60
OIR    2025250     91400   16.8200 -113.7000      18.9        18       125        60
OIR    2025250     91400   16.8200 -113.7100      19.1        17       123        60
OIR    2025250     91400   16.8200 -113.7200      19.2        17       122        60
OIR    2025250     91400   16.8200 -113.7300      18.3        18       124        60
OIR    2025250     91400   16.8200 -113.7400      16.9        17       126        60
OIR    2025250     91400   16.8200 -113.7500      16.7        18       125        60
OIR    2025250     91400   16.8200 -113.7600      16.6        19       124        60
OIR    2025250     91400   16.8200 -113.7700      16.3        19       124        60
OIR    2025250     91400   16.8200 -113.7800      16.1        20       123        60
OIR    2025250     91400   16.8200 -113.7900      15.7        20       123        60
OIR    2025250     91400   16.8200 -113.8000      15.0        20       126        60
OIR    2025250     91400   16.8200 -113.8100      13.9        21       128        60
OIR    2025250     91400   16.8200 -113.8200      13.4        22       134        60
OIR    2025250     91400   16.8200 -113.8300      13.0        24       140        60
OIR    2025250     91400   16.8100 -112.6400      21.9        41       143        60
OIR    2025250     91400   16.8100 -112.6500      22.1        41       140        60
OIR    2025250     91400   16.8100 -112.6600      22.1        42       140        60
OIR    2025250     91400   16.8100 -112.6700      22.2        42       142        60
OIR    2025250     91400   16.8100 -112.6800      22.2        42       144        60
OIR    2025250     91400   16.8100 -113.6900      18.3        31       137        60
OIR    2025250     91400   16.8100 -113.7000      17.6        16       123        60
OIR    2025250     91400   16.8100 -113.7100      18.2        16       122        60
OIR    2025250     91400   16.8100 -113.7200      18.0        18       121        60
OIR    2025250     91400   16.8100 -113.7300      17.0        20       122        60
OIR    2025250     91400   16.8100 -113.7400      16.6        20       124        60
OIR    2025250     91400   16.8100 -113.7500      16.5        20       124        60
OIR    2025250     91400   16.8100 -113.7600      16.4        20       123        60
OIR    2025250     91400   16.8100 -113.7700      16.3        20       122        60
OIR    2025250     91400   16.8100 -113.7800      16.1        20       120        60
OIR    2025250     91400   16.8100 -113.7900      15.7        21       120        60
OIR    2025250     91400   16.8100 -113.8000      15.2        21       123        60
OIR    2025250     91400   16.8100 -113.8100      14.6        20       126        60
OIR    2025250     91400   16.8100 -113.8200      14.2        21       134        60
OIR    2025250     91400   16.8100 -113.8300      13.9        23       141        60
OIR    2025250     91400   16.8000 -112.6300      21.5        40       142        60
OIR    2025250     91400   16.8000 -112.6400      21.8        40       139        60
OIR    2025250     91400   16.8000 -112.6500      22.1        42       137        60
OIR    2025250     91400   16.8000 -112.6600      22.1        42       138        60
OIR    2025250     91400   16.8000 -112.6700      22.2        42       140        60
OIR    2025250     91400   16.8000 -112.6800      22.2        42       143        60
OIR    2025250     91400   16.8000 -113.6900      18.2        33       136        60
OIR    2025250     91400   16.8000 -113.7000      16.9        15       123        60
OIR    2025250     91400   16.8000 -113.7100      16.9        17       121        60
OIR    2025250     91400   16.8000 -113.7200      16.7        20       120        60
OIR    2025250     91400   16.8000 -113.7300      16.5        21       120        60
OIR    2025250     91400   16.8000 -113.7400      16.4        21       121        60
OIR    2025250     91400   16.8000 -113.7500      16.4        21       122        60
OIR    2025250     91400   16.8000 -113.7600      16.3        21       121        60
OIR    2025250     91400   16.8000 -113.7700      16.2        21       120        60
OIR    2025250     91400   16.8000 -113.7800      16.1        21       119        60
OIR    2025250     91400   16.8000 -113.7900      15.7        21       116        60
OIR    2025250     91400   16.8000 -113.8000      15.3        21       121        60
OIR    2025250     91400   16.8000 -113.8100      14.8        20       125        60
OIR    2025250     91400   16.8000 -113.8200      14.5        21       133        60
OIR    2025250     91400   16.8000 -113.8300      14.2        23       142        60
OIR    2025250     91400   16.7900 -112.6300      21.5        39       141        60
OIR    2025250     91400   16.7900 -112.6400      21.8        40       138        60
OIR    2025250     91400   16.7900 -112.6500      22.1        42       135        60
OIR    2025250     91400   16.7900 -112.6600      22.1        42       136        60
OIR    2025250     91400   16.7900 -112.6700      22.2        42       139        60
OIR    2025250     91400   16.7900 -112.6800      22.2        42       142        60
OIR    2025250     91400   16.7900 -113.6900      17.6        33       136        60
OIR    2025250     91400   16.7900 -113.7000      16.5        21       122        60
OIR    2025250     91400   16.7900 -113.7100      16.5        20       120        60
OIR    2025250     91400   16.7900 -113.7200      16.5        21       117        60
OIR    2025250     91400   16.7900 -113.7300      16.4        21       117        60
OIR    2025250     91400   16.7900 -113.7400      16.4        21       117        60
OIR    2025250     91400   16.7900 -113.7500      16.4        21       117        60
OIR    2025250     91400   16.7900 -113.7600      16.3        21       119        60
OIR    2025250     91400   16.7900 -113.7700      16.2        21       119        60
OIR    2025250     91400   16.7900 -113.7800      16.1        21       119        60
OIR    2025250     91400   16.7900 -113.7900      15.8        21       117        60
OIR    2025250     91400   16.7900 -113.8000      15.4        21       121        60
OIR    2025250     91400   16.7900 -113.8100      15.0        20       125        60
OIR    2025250     91400   16.7900 -113.8200      14.6        21       133        60
OIR    2025250     91400   16.7900 -113.8300      14.3        23       143        60
OIR    2025250     91400   16.7800 -112.6300      21.5        39       143        60
OIR    2025250     91400   16.7800 -112.6400      21.8        41       139        60
OIR    2025250     91400   16.7800 -112.6500      22.1        42       136        60
OIR    2025250     91400   16.7800 -112.6600      22.1        42       136        60
OIR    2025250     91400   16.7800 -112.6700      22.2        42       141        60
OIR    2025250     91400   16.7800 -113.6800      18.3        36       142        60
OIR    2025250     91400   16.7800 -113.6900      18.0        33       132        60
OIR    2025250     91400   16.7800 -113.7000      16.9        23       121        60
OIR    2025250     91400   16.7800 -113.7100      16.6        21       116        60
OIR    2025250     91400   16.7800 -113.7200      16.5        21       116        60
OIR    2025250     91400   16.7800 -113.7300      16.4        21       115        60
OIR    2025250     91400   16.7800 -113.7400      16.4        21       115        60
OIR    2025250     91400   16.7800 -113.7500      16.4        21       115        60
OIR    2025250     91400   16.7800 -113.7600      16.3        21       116        60
OIR    2025250     91400   16.7800 -113.7700      16.2        21       116        60
OIR    2025250     91400   16.7800 -113.7800      16.1        21       117        60
OIR    2025250     91400   16.7800 -113.7900      15.9        21       117        60
OIR    2025250     91400   16.7800 -113.8000      15.6        21       121        60
OIR    2025250     91400   16.7800 -113.8100      15.2        20       126        60
OIR    2025250     91400   16.7800 -113.8200      14.6        22       132        60
OIR    2025250     91400   16.7800 -113.8300      14.3        23       143        60
OIR    2025250     91400   16.7700 -112.6300      21.6        39       144        60
OIR    2025250     91400   16.7700 -112.6400      21.9        41       140        60
OIR    2025250     91400   16.7700 -112.6500      22.1        42       137        60
OIR    2025250     91400   16.7700 -112.6600      22.1        42       136        60
OIR    2025250     91400   16.7700 -112.6700      22.2        42       142        60
OIR    2025250     91400   16.7700 -113.6800      17.9        36       132        60
OIR    2025250     91400   16.7700 -113.6900      17.3        34       123        60
OIR    2025250     91400   16.7700 -113.7000      16.5        25       116        60
OIR    2025250     91400   16.7700 -113.7100      16.5        22       113        60
OIR    2025250     91400   16.7700 -113.7200      16.4        22       112        60
OIR    2025250     91400   16.7700 -113.7300      16.4        22       111        60
OIR    2025250     91400   16.7700 -113.7400      16.4        22       112        60
OIR    2025250     91400   16.7700 -113.7500      16.4        22       112        60
OIR    2025250     91400   16.7700 -113.7600      16.3        22       114        60
OIR    2025250     91400   16.7700 -113.7700      16.3        22       116        60
OIR    2025250     91400   16.7700 -113.7800      16.1        21       116        60
OIR    2025250     91400   16.7700 -113.7900      15.9        21       117        60
OIR    2025250     91400   16.7700 -113.8000      15.6        21       122        60
OIR    2025250     91400   16.7700 -113.8100      15.3        21       128        60
OIR    2025250     91400   16.7700 -113.8200      14.6        22       135        60
OIR    2025250     91400   16.7700 -113.8300      14.3        22       143        60
OIR    2025250     91400   16.7600 -112.6400      21.9        41       141        60
OIR    2025250     91400   16.7600 -112.6500      22.1        42       139        60
OIR    2025250     91400   16.7600 -112.6600      22.2        42       138        60
OIR    2025250     91400   16.7600 -112.6700      22.2        42       141        60
OIR    2025250     91400   16.7600 -113.6700      17.8        38       141        60
OIR    2025250     91400   16.7600 -113.6800      17.0        38       127        60
OIR    2025250     91400   16.7600 -113.6900      16.4        34       117        60
OIR    2025250     91400   16.7600 -113.7000      16.4        25       115        60
OIR    2025250     91400   16.7600 -113.7100      16.5        22       112        60
OIR    2025250     91400   16.7600 -113.7200      16.5        22       111        60
OIR    2025250     91400   16.7600 -113.7300      16.5        22       110        60
OIR    2025250     91400   16.7600 -113.7400      16.5        22       111        60
OIR    2025250     91400   16.7600 -113.7500      16.5        22       112        60
OIR    2025250     91400   16.7600 -113.7600      16.4        22       113        60
OIR    2025250     91400   16.7600 -113.7700      16.3        22       115        60
OIR    2025250     91400   16.7600 -113.7800      16.1        22       116        60
OIR    2025250     91400   16.7600 -113.7900      15.8        21       119        60
OIR    2025250     91400   16.7600 -113.8000      15.5        21       124        60
OIR    2025250     91400   16.7600 -113.8100      15.3        21       131        60
OIR    2025250     91400   16.7600 -113.8200      14.6        22       139        60
OIR    2025250     91400   16.7500 -112.6400      22.1        42       142        60
OIR    2025250     91400   16.7500 -112.6500      22.2        42       141        60
OIR    2025250     91400   16.7500 -112.6600      22.2        42       140        60
OIR    2025250     91400   16.7500 -112.6700      22.2        42       142        60
OIR    2025250     91400   16.7500 -113.6600      18.7        43       143        60
OIR    2025250     91400   16.7500 -113.6700      16.9        41       132        60
OIR    2025250     91400   16.7500 -113.6800      15.5        40       122        60
OIR    2025250     91400   16.7500 -113.6900      14.8        31       116        60
OIR    2025250     91400   16.7500 -113.7000      15.9        23       116        60
OIR    2025250     91400   16.7500 -113.7100      16.4        22       114        60
OIR    2025250     91400   16.7500 -113.7200      16.5        22       113        60
OIR    2025250     91400   16.7500 -113.7300      16.5        22       112        60
OIR    2025250     91400   16.7500 -113.7400      16.5        22       112        60
OIR    2025250     91400   16.7500 -113.7500      16.5        22       114        60
OIR    2025250     91400   16.7500 -113.7600      16.5        22       115        60
OIR    2025250     91400   16.7500 -113.7700      16.3        23       116        60
OIR    2025250     91400   16.7500 -113.7800      16.0        23       119        60
OIR    2025250     91400   16.7500 -113.7900      15.7        22       124        60
OIR    2025250     91400   16.7500 -113.8000      15.4        21       129        60
OIR    2025250     91400   16.7500 -113.8100      15.2        21       137        60
OIR    2025250     91400   16.7500 -113.8200      14.7        21       145        60
OIR    2025250     91400   16.7400 -112.5000      21.6        38       144        60
OIR    2025250     91400   16.7400 -112.5100      21.6        38       144        60
OIR    2025250     91400   16.7400 -112.6300      21.7        39       145        60
OIR    2025250     91400   16.7400 -112.6400      22.1        42       143        60
OIR    2025250     91400   16.7400 -112.6500      22.2        42       143        60
OIR    2025250     91400   16.7400 -112.6600      22.2        42       142        60
OIR    2025250     91400   16.7400 -112.6700      22.2        42       144        60
OIR    2025250     91400   16.7400 -113.6700      17.0        37       135        60
OIR    2025250     91400   16.7400 -113.6800      16.8        35       123        60
OIR    2025250     91400   16.7400 -113.6900      14.9        27       115        60
OIR    2025250     91400   16.7400 -113.7000      15.7        22       115        60
OIR    2025250     91400   16.7400 -113.7100      16.4        22       114        60
OIR    2025250     91400   16.7400 -113.7200      16.5        22       114        60
OIR    2025250     91400   16.7400 -113.7300      16.5        22       113        60
OIR    2025250     91400   16.7400 -113.7400      16.6        22       113        60
OIR    2025250     91400   16.7400 -113.7500      16.6        23       115        60
OIR    2025250     91400   16.7400 -113.7600      16.6        24       116        60
OIR    2025250     91400   16.7400 -113.7700      16.4        25       117        60
OIR    2025250     91400   16.7400 -113.7800      16.1        24       120        60
OIR    2025250     91400   16.7400 -113.7900      15.5        21       126        60
OIR    2025250     91400   16.7400 -113.8000      15.3        21       131        60
OIR    2025250     91400   16.7400 -113.8100      15.2        20       140        60
OIR    2025250     91400   16.7300 -112.5100      21.6        38       144        60
OIR    2025250     91400   16.7300 -112.5200      21.6        38       145        60
OIR    2025250     91400   16.7300 -112.6200      21.6        38       143        60
OIR    2025250     91400   16.7300 -112.6300      21.8        40       142        60
OIR    2025250     91400   16.7300 -112.6400      22.1        42       142        60
OIR    2025250     91400   16.7300 -112.6500      22.2        42       143        60
OIR    2025250     91400   16.7300 -112.6600      22.2        42       143        60
OIR    2025250     91400   16.7300 -112.6700      22.2        42       145        60
OIR    2025250     91400   16.7300 -113.6200      21.2        27       142        60
OIR    2025250     91400   16.7300 -113.6800      17.2        34       129        60
OIR    2025250     91400   16.7300 -113.6900      15.9        30       113        60
OIR    2025250     91400   16.7300 -113.7000      15.8        19       114        60
OIR    2025250     91400   16.7300 -113.7100      16.6        21       114        60
OIR    2025250     91400   16.7300 -113.7200      16.8        22       114        60
OIR    2025250     91400   16.7300 -113.7300      16.9        22       114        60
OIR    2025250     91400   16.7300 -113.7400      17.0        22       115        60
OIR    2025250     91400   16.7300 -113.7500      17.1        23       116        60
OIR    2025250     91400   16.7300 -113.7600      17.2        25       116        60
OIR    2025250     91400   16.7300 -113.7700      16.9        26       119        60
OIR    2025250     91400   16.7300 -113.7800      16.1        24       120        60
OIR    2025250     91400   16.7300 -113.7900      15.4        21       125        60
OIR    2025250     91400   16.7300 -113.8000      15.1        20       131        60
OIR    2025250     91400   16.7300 -113.8100      15.1        18       139        60
OIR    2025250     91400   16.7200 -112.5200      21.6        38       145        60
OIR    2025250     91400   16.7200 -112.5300      21.6        38       144        60
OIR    2025250     91400   16.7200 -112.6000      21.6        38       145        60
OIR    2025250     91400   16.7200 -112.6100      21.6        38       143        60
OIR    2025250     91400   16.7200 -112.6200      21.6        38       141        60
OIR    2025250     91400   16.7200 -112.6300      21.7        39       140        60
OIR    2025250     91400   16.7200 -112.6400      22.0        41       140        60
OIR    2025250     91400   16.7200 -112.6500      22.1        42       141        60
OIR    2025250     91400   16.7200 -112.6600      22.2        42       143        60
OIR    2025250     91400   16.7200 -112.6700      22.2        42       145        60
OIR    2025250     91400   16.7200 -113.6000      24.9        14       143        60
OIR    2025250     91400   16.7200 -113.6100      26.9        13       139        60
OIR    2025250     91400   16.7200 -113.6200      27.6        13       134        60
OIR    2025250     91400   16.7200 -113.6300      27.9        14       134        60
OIR    2025250     91400   16.7200 -113.6400      27.9        14       139        60
OIR    2025250     91400   16.7200 -113.6500      28.2        16       144        60
OIR    2025250     91400   16.7200 -113.6600      28.7        17       145        60
OIR    2025250     91400   16.7200 -113.6700      28.5        21       145        60
OIR    2025250     91400   16.7200 -113.6800      23.7        22       130        60
OIR    2025250     91400   16.7200 -113.6900      21.6        24       116        60
OIR    2025250     91400   16.7200 -113.7000      21.7        16       113        60
OIR    2025250     91400   16.7200 -113.7100      21.8        18       114        60
OIR    2025250     91400   16.7200 -113.7200      21.6        20       115        60
OIR    2025250     91400   16.7200 -113.7300      21.2        21       115        60
OIR    2025250     91400   16.7200 -113.7400      20.5        22       116        60
OIR    2025250     91400   16.7200 -113.7500      19.6        24       116        60
OIR    2025250     91400   16.7200 -113.7600      18.7        27       117        60
OIR    2025250     91400   16.7200 -113.7700      17.8        28       120        60
OIR    2025250     91400   16.7200 -113.7800      15.9        21       122        60
OIR    2025250     91400   16.7200 -113.7900      14.7        20       127        60
OIR    2025250     91400   16.7200 -113.8000      14.4        19       134        60
OIR    2025250     91400   16.7200 -113.8100      14.7        14       143        60
OIR    2025250     91400   16.7100 -112.5000      21.1        37       144        60
OIR    2025250     91400   16.7100 -112.5100      21.4        37       142        60
OIR    2025250     91400   16.7100 -112.5200      21.5        38       141        60
OIR    2025250     91400   16.7100 -112.5300      21.6        38       141        60
OIR    2025250     91400   16.7100 -112.5400      21.6        38       142        60
OIR    2025250     91400   16.7100 -112.5500      21.6        38       143        60
OIR    2025250     91400   16.7100 -112.6000      21.6        38       144        60
OIR    2025250     91400   16.7100 -112.6100      21.6        38       143        60
OIR    2025250     91400   16.7100 -112.6200      21.6        38       141        60
OIR    2025250     91400   16.7100 -112.6300      21.7        39       140        60
OIR    2025250     91400   16.7100 -112.6400      21.9        41       139        60
OIR    2025250     91400   16.7100 -112.6500      22.1        42       139        60
OIR    2025250     91400   16.7100 -112.6600      22.2        42       143        60
OIR    2025250     91400   16.7100 -113.5800      21.7        24       140        60
OIR    2025250     91400   16.7100 -113.5900      21.8        20       132        60
OIR    2025250     91400   16.7100 -113.6000      23.3        12       125        60
OIR    2025250     91400   16.7100 -113.6100      25.3        11       124        60
OIR    2025250     91400   16.7100 -113.6200      26.4        12       126        60
OIR    2025250     91400   16.7100 -113.6300      27.6        14       124        60
OIR    2025250     91400   16.7100 -113.6400      28.0        15       121        60
OIR    2025250     91400   16.7100 -113.6500      28.3        15       117        60
OIR    2025250     91400   16.7100 -113.6600      28.5        16       124        60
OIR    2025250     91400   16.7100 -113.6700      28.2        19       131        60
OIR    2025250     91400   16.7100 -113.6800      25.8        21       127        60
OIR    2025250     91400   16.7100 -113.6900      23.5        22       116        60
OIR    2025250     91400   16.7100 -113.7000      23.1        18       113        60
OIR    2025250     91400   16.7100 -113.7100      22.6        19       115        60
OIR    2025250     91400   16.7100 -113.7200      22.3        20       116        60
OIR    2025250     91400   16.7100 -113.7300      22.0        21       116        60
OIR    2025250     91400   16.7100 -113.7400      21.7        22       116        60
OIR    2025250     91400   16.7100 -113.7500      21.2        23       117        60
OIR    2025250     91400   16.7100 -113.7600      20.2        26       119        60
OIR    2025250     91400   16.7100 -113.7700      18.8        26       121        60
OIR    2025250     91400   16.7100 -113.7800      15.4        20       124        60
OIR    2025250     91400   16.7100 -113.7900      13.0        15       132        60
OIR    2025250     91400   16.7100 -113.8000      12.8        12       143        60
OIR    2025250     91400   16.7000 -112.4600      20.4        36       144        60
OIR    2025250     91400   16.7000 -112.4700      20.5        36       143        60
OIR    2025250     91400   16.7000 -112.4800      20.6        36       145        60
OIR    2025250     91400   16.7000 -112.4900      20.7        36       145        60
OIR    2025250     91400   16.7000 -112.5000      20.9        37       141        60
OIR    2025250     91400   16.7000 -112.5100      21.2        37       138        60
OIR    2025250     91400   16.7000 -112.5200      21.4        38       137        60
OIR    2025250     91400   16.7000 -112.5300      21.5        38       137        60
OIR    2025250     91400   16.7000 -112.5400      21.6        38       137        60
OIR    2025250     91400   16.7000 -112.5500      21.6        38       138        60
OIR    2025250     91400   16.7000 -112.5600      21.6        38       139        60
OIR    2025250     91400   16.7000 -112.5700      21.6        38       143        60
OIR    2025250     91400   16.7000 -112.6100      21.6        38       145        60
OIR    2025250     91400   16.7000 -112.6200      21.6        39       143        60
OIR    2025250     91400   16.7000 -112.6300      21.7        39       142        60
OIR    2025250     91400   16.7000 -112.6400      21.8        40       140        60
OIR    2025250     91400   16.7000 -112.6500      22.1        42       139        60
OIR    2025250     91400   16.7000 -112.6600      22.2        42       143        60
OIR    2025250     91400   16.7000 -113.5900      22.4        17       144        60
OIR    2025250     91400   16.7000 -113.6000      22.8        12       138        60
OIR    2025250     91400   16.7000 -113.6100      23.5        12       131        60
OIR    2025250     91400   16.7000 -113.6200      23.9        11       124        60
OIR    2025250     91400   16.7000 -113.6300      26.9        14       119        60
OIR    2025250     91400   16.7000 -113.6400      28.1        15       116        60
OIR    2025250     91400   16.7000 -113.6500      28.4        15       113        60
OIR    2025250     91400   16.7000 -113.6600      28.4        16       116        60
OIR    2025250     91400   16.7000 -113.6700      27.5        18       122        60
OIR    2025250     91400   16.7000 -113.6800      26.3        20       122        60
OIR    2025250     91400   16.7000 -113.6900      25.2        19       116        60
OIR    2025250     91400   16.7000 -113.7000      24.4        18       115        60
OIR    2025250     91400   16.7000 -113.7100      23.2        19       115        60
OIR    2025250     91400   16.7000 -113.7200      22.8        21       116        60
OIR    2025250     91400   16.7000 -113.7300      22.4        22       116        60
OIR    2025250     91400   16.7000 -113.7400      22.2        22       117        60
OIR    2025250     91400   16.7000 -113.7500      22.1        22       119        60
OIR    2025250     91400   16.7000 -113.7600      22.4        22       119        60
OIR    2025250     91400   16.7000 -113.7700      21.7        24       123        60
OIR    2025250     91400   16.7000 -113.7800      15.6        23       127        60
OIR    2025250     91400   16.7000 -113.7900      12.8        12       135        60
OIR    2025250     91400   16.6900 -112.4700      20.4        36       143        60
OIR    2025250     91400   16.6900 -112.4800      20.5        36       143        60
OIR    2025250     91400   16.6900 -112.4900      20.6        36       143        60
OIR    2025250     91400   16.6900 -112.5000      20.8        37       140        60
OIR    2025250     91400   16.6900 -112.5100      21.0        37       137        60
OIR    2025250     91400   16.6900 -112.5200      21.3        37       136        60
OIR    2025250     91400   16.6900 -112.5300      21.5        38       137        60
OIR    2025250     91400   16.6900 -112.5400      21.6        38       137        60
OIR    2025250     91400   16.6900 -112.5500      21.6        38       137        60
OIR    2025250     91400   16.6900 -112.5600      21.6        38       137        60
OIR    2025250     91400   16.6900 -112.5700      21.6        38       140        60
OIR    2025250     91400   16.6900 -112.5800      21.6        38       144        60
OIR    2025250     91400   16.6900 -112.5900      21.6        38       145        60
OIR    2025250     91400   16.6900 -112.6100      21.6        38       144        60
OIR    2025250     91400   16.6900 -112.6200      21.6        39       142        60
OIR    2025250     91400   16.6900 -112.6300      21.6        39       141        60
OIR    2025250     91400   16.6900 -112.6400      21.7        40       140        60
OIR    2025250     91400   16.6900 -112.6500      22.1        42       139        60
OIR    2025250     91400   16.6900 -112.6600      22.2        42       143        60
OIR    2025250     91400   16.6900 -113.6100      23.4        12       143        60
OIR    2025250     91400   16.6900 -113.6200      24.6        10       129        60
OIR    2025250     91400   16.6900 -113.6300      27.4        14       115        60
OIR    2025250     91400   16.6900 -113.6400      28.2        15       114        60
OIR    2025250     91400   16.6900 -113.6500      28.3        16       113        60
OIR    2025250     91400   16.6900 -113.6600      28.1        16       114        60
OIR    2025250     91400   16.6900 -113.6700      27.5        18       116        60
OIR    2025250     91400   16.6900 -113.6800      26.9        19       116        60
OIR    2025250     91400   16.6900 -113.6900      26.8        18       116        60
OIR    2025250     91400   16.6900 -113.7000      25.7        18       116        60
OIR    2025250     91400   16.6900 -113.7100      24.2        20       116        60
OIR    2025250     91400   16.6900 -113.7200      24.1        20       116        60
OIR    2025250     91400   16.6900 -113.7300      23.5        21       116        60
OIR    2025250     91400   16.6900 -113.7400      23.2        22       117        60
OIR    2025250     91400   16.6900 -113.7500      24.0        21       119        60
OIR    2025250     91400   16.6900 -113.7600      24.9        20       120        60
OIR    2025250     91400   16.6900 -113.7700      25.3        21       123        60
OIR    2025250     91400   16.6900 -113.7800      25.5        22       128        60
OIR    2025250     91400   16.6900 -113.7900      14.2        17       135        60
OIR    2025250     91400   16.6800 -112.4700      20.2        36       144        60
OIR    2025250     91400   16.6800 -112.4800      20.4        36       142        60
OIR    2025250     91400   16.6800 -112.4900      20.5        36       141        60
OIR    2025250     91400   16.6800 -112.5000      20.7        37       139        60
OIR    2025250     91400   16.6800 -112.5100      20.9        37       136        60
OIR    2025250     91400   16.6800 -112.5200      21.1        37       135        60
OIR    2025250     91400   16.6800 -112.5300      21.3        38       137        60
OIR    2025250     91400   16.6800 -112.5400      21.5        38       138        60
OIR    2025250     91400   16.6800 -112.5500      21.5        38       138        60
OIR    2025250     91400   16.6800 -112.5600      21.6        38       138        60
OIR    2025250     91400   16.6800 -112.5700      21.6        38       140        60
OIR    2025250     91400   16.6800 -112.5800      21.6        38       143        60
OIR    2025250     91400   16.6800 -112.5900      21.6        38       144        60
OIR    2025250     91400   16.6800 -112.6000      21.6        38       144        60
OIR    2025250     91400   16.6800 -112.6100      21.6        39       143        60
OIR    2025250     91400   16.6800 -112.6200      21.6        39       140        60
OIR    2025250     91400   16.6800 -112.6300      21.6        39       138        60
OIR    2025250     91400   16.6800 -112.6400      21.7        39       139        60
OIR    2025250     91400   16.6800 -112.6500      22.0        42       139        60
OIR    2025250     91400   16.6800 -112.6600      22.1        42       143        60
OIR    2025250     91400   16.6800 -113.6200      28.2        12       136        60
OIR    2025250     91400   16.6800 -113.6300      28.9        15       124        60
OIR    2025250     91400   16.6800 -113.6400      29.4        15       120        60
OIR    2025250     91400   16.6800 -113.6500      29.6        15       117        60
OIR    2025250     91400   16.6800 -113.6600      29.6        16       116        60
OIR    2025250     91400   16.6800 -113.6700      28.7        17       116        60
OIR    2025250     91400   16.6800 -113.6800      27.6        18       116        60
OIR    2025250     91400   16.6800 -113.6900      27.2        18       120        60
OIR    2025250     91400   16.6800 -113.7000      26.5        19       121        60
OIR    2025250     91400   16.6800 -113.7100      24.7        20       119        60
OIR    2025250     91400   16.6800 -113.7200      24.7        21       116        60
OIR    2025250     91400   16.6800 -113.7300      25.1        21       117        60
OIR    2025250     91400   16.6800 -113.7400      25.2        21       119        60
OIR    2025250     91400   16.6800 -113.7500      25.2        21       121        60
OIR    2025250     91400   16.6800 -113.7600      25.3        21       124        60
OIR    2025250     91400   16.6800 -113.7700      25.3        21       127        60
OIR    2025250     91400   16.6800 -113.7800      25.3        21       134        60
OIR    2025250     91400   16.6800 -113.7900      22.6        24       140        60
OIR    2025250     91400   16.6700 -112.4600      19.7        36       145        60
OIR    2025250     91400   16.6700 -112.4700      19.9        36       142        60
OIR    2025250     91400   16.6700 -112.4800      20.1        36       140        60
OIR    2025250     91400   16.6700 -112.4900      20.3        36       138        60
OIR    2025250     91400   16.6700 -112.5000      20.5        37       137        60
OIR    2025250     91400   16.6700 -112.5100      20.7        37       137        60
OIR    2025250     91400   16.6700 -112.5200      20.9        37       137        60
OIR    2025250     91400   16.6700 -112.5300      21.1        38       138        60
OIR    2025250     91400   16.6700 -112.5400      21.3        38       138        60
OIR    2025250     91400   16.6700 -112.5500      21.5        38       138        60
OIR    2025250     91400   16.6700 -112.5600      21.5        38       138        60
OIR    2025250     91400   16.6700 -112.5700      21.5        38       139        60
OIR    2025250     91400   16.6700 -112.5800      21.6        38       140        60
OIR    2025250     91400   16.6700 -112.5900      21.6        38       142        60
OIR    2025250     91400   16.6700 -112.6000      21.6        38       142        60
OIR    2025250     91400   16.6700 -112.6100      21.6        39       143        60
OIR    2025250     91400   16.6700 -112.6200      21.6        39       140        60
OIR    2025250     91400   16.6700 -112.6300      21.6        39       136        60
OIR    2025250     91400   16.6700 -112.6400      21.7        39       137        60
OIR    2025250     91400   16.6700 -112.6500      22.0        42       139        60
OIR    2025250     91400   16.6700 -112.6600      22.1        42       142        60
OIR    2025250     91400   16.6700 -113.5800      22.6        19       143        60
OIR    2025250     91400   16.6700 -113.5900      23.4        14       141        60
OIR    2025250     91400   16.6700 -113.6000      24.7        10       144        60
OIR    2025250     91400   16.6700 -113.6200      28.7        14       142        60
OIR    2025250     91400   16.6700 -113.6300      29.3        15       134        60
OIR    2025250     91400   16.6700 -113.6400      29.5        15       128        60
OIR    2025250     91400   16.6700 -113.6500      29.6        16       125        60
OIR    2025250     91400   16.6700 -113.6600      29.5        16       121        60
OIR    2025250     91400   16.6700 -113.6700      28.8        17       120        60
OIR    2025250     91400   16.6700 -113.6800      27.9        18       119        60
OIR    2025250     91400   16.6700 -113.6900      27.4        18       123        60
OIR    2025250     91400   16.6700 -113.7000      26.8        19       126        60
OIR    2025250     91400   16.6700 -113.7100      25.8        20       122        60
OIR    2025250     91400   16.6700 -113.7200      25.3        21       117        60
OIR    2025250     91400   16.6700 -113.7300      25.3        21       119        60
OIR    2025250     91400   16.6700 -113.7400      25.2        21       122        60
OIR    2025250     91400   16.6700 -113.7500      25.3        21       125        60
OIR    2025250     91400   16.6700 -113.7600      25.2        21       130        60
OIR    2025250     91400   16.6700 -113.7700      25.2        21       135        60
OIR    2025250     91400   16.6700 -113.7800      25.1        21       143        60
OIR    2025250     91400   16.6600 -112.4300      19.1        36       144        60
OIR    2025250     91400   16.6600 -112.4600      19.4        36       144        60
OIR    2025250     91400   16.6600 -112.4700      19.6        36       141        60
OIR    2025250     91400   16.6600 -112.4800      19.8        36       139        60
OIR    2025250     91400   16.6600 -112.4900      20.0        36       136        60
OIR    2025250     91400   16.6600 -112.5000      20.2        36       134        60
OIR    2025250     91400   16.6600 -112.5100      20.5        37       137        60
OIR    2025250     91400   16.6600 -112.5200      20.7        37       139        60
OIR    2025250     91400   16.6600 -112.5300      20.9        37       139        60
OIR    2025250     91400   16.6600 -112.5400      21.1        38       139        60
OIR    2025250     91400   16.6600 -112.5500      21.3        38       138        60
OIR    2025250     91400   16.6600 -112.5600      21.4        38       138        60
OIR    2025250     91400   16.6600 -112.5700      21.5        38       138        60
OIR    2025250     91400   16.6600 -112.5800      21.5        38       138        60
OIR    2025250     91400   16.6600 -112.5900      21.6        38       138        60
OIR    2025250     91400   16.6600 -112.6000      21.6        38       140        60
OIR    2025250     91400   16.6600 -112.6100      21.6        39       142        60
OIR    2025250     91400   16.6600 -112.6200      21.6        39       140        60
OIR    2025250     91400   16.6600 -112.6300      21.6        39       136        60
OIR    2025250     91400   16.6600 -112.6400      21.7        39       136        60
OIR    2025250     91400   16.6600 -112.6500      22.1        42       138        60
OIR    2025250     91400   16.6600 -112.6600      22.1        42       140        60
OIR    2025250     91400   16.6600 -112.6700      22.1        42       144        60
OIR    2025250     91400   16.6600 -113.5900      23.8        19       146        60
OIR    2025250     91400   16.6600 -113.6300      28.9        16       141        60
OIR    2025250     91400   16.6600 -113.6400      29.1        16       138        60
OIR    2025250     91400   16.6600 -113.6500      29.2        16       138        60
OIR    2025250     91400   16.6600 -113.6600      29.0        17       136        60
OIR    2025250     91400   16.6600 -113.6700      28.5        18       129        60
OIR    2025250     91400   16.6600 -113.6800      27.8        18       123        60
OIR    2025250     91400   16.6600 -113.6900      27.1        19       127        60
OIR    2025250     91400   16.6600 -113.7000      26.5        19       132        60
OIR    2025250     91400   16.6600 -113.7100      25.9        20       132        60
OIR    2025250     91400   16.6600 -113.7200      25.5        21       131        60
OIR    2025250     91400   16.6600 -113.7300      25.4        21       131        60
OIR    2025250     91400   16.6600 -113.7400      25.1        22       133        60
OIR    2025250     91400   16.6600 -113.7500      25.1        22       136        60
OIR    2025250     91400   16.6600 -113.7600      25.1        22       143        60
OIR    2025250     91400   16.6500 -112.4700      19.4        36       144        60
OIR    2025250     91400   16.6500 -112.4800      19.6        36       142        60
OIR    2025250     91400   16.6500 -112.4900      19.8        36       140        60
OIR    2025250     91400   16.6500 -112.5000      19.9        36       138        60
OIR    2025250     91400   16.6500 -112.5100      20.1        37       139        60
OIR    2025250     91400   16.6500 -112.5200      20.4        37       140        60
OIR    2025250     91400   16.6500 -112.5300      20.7        37       140        60
OIR    2025250     91400   16.6500 -112.5400      20.9        38       140        60
OIR    2025250     91400   16.6500 -112.5500      21.0        38       139        60
OIR    2025250     91400   16.6500 -112.5600      21.2        38       138        60
OIR    2025250     91400   16.6500 -112.5700      21.4        38       137        60
OIR    2025250     91400   16.6500 -112.5800      21.5        38       136        60
OIR    2025250     91400   16.6500 -112.5900      21.5        38       136        60
OIR    2025250     91400   16.6500 -112.6000      21.5        39       138        60
OIR    2025250     91400   16.6500 -112.6100      21.5        39       139        60
OIR    2025250     91400   16.6500 -112.6200      21.6        39       138        60
OIR    2025250     91400   16.6500 -112.6300      21.6        39       136        60
OIR    2025250     91400   16.6500 -112.6400      21.7        40       135        60
OIR    2025250     91400   16.6500 -112.6500      22.1        42       137        60
OIR    2025250     91400   16.6500 -112.6600      22.1        42       140        60
OIR    2025250     91400   16.6500 -112.6700      22.1        42       145        60
OIR    2025250     91400   16.6500 -113.6700      27.8        18       140        60
OIR    2025250     91400   16.6500 -113.6800      27.3        19       131        60
OIR    2025250     91400   16.6500 -113.6900      26.8        20       131        60
OIR    2025250     91400   16.6500 -113.7000      26.4        20       137        60
OIR    2025250     91400   16.6500 -113.7100      25.8        20       143        60
OIR    2025250     91400   16.6400 -112.4900      19.6        36       143        60
OIR    2025250     91400   16.6400 -112.5000      19.7        36       141        60
OIR    2025250     91400   16.6400 -112.5100      19.9        37       141        60
OIR    2025250     91400   16.6400 -112.5200      20.1        37       140        60
OIR    2025250     91400   16.6400 -112.5300      20.3        37       140        60
OIR    2025250     91400   16.6400 -112.5400      20.5        37       140        60
OIR    2025250     91400   16.6400 -112.5500      20.7        38       140        60
OIR    2025250     91400   16.6400 -112.5600      20.9        38       137        60
OIR    2025250     91400   16.6400 -112.5700      21.1        38       135        60
OIR    2025250     91400   16.6400 -112.5800      21.3        38       135        60
OIR    2025250     91400   16.6400 -112.5900      21.5        38       135        60
OIR    2025250     91400   16.6400 -112.6000      21.5        39       135        60
OIR    2025250     91400   16.6400 -112.6100      21.5        39       136        60
OIR    2025250     91400   16.6400 -112.6200      21.5        39       135        60
OIR    2025250     91400   16.6400 -112.6300      21.6        39       135        60
OIR    2025250     91400   16.6400 -112.6400      21.6        40       135        60
OIR    2025250     91400   16.6400 -112.6500      22.0        42       138        60
OIR    2025250     91400   16.6400 -112.6600      22.1        42       140        60
OIR    2025250     91400   16.6300 -112.4900      19.5        36       143        60
OIR    2025250     91400   16.6300 -112.5000      19.6        36       140        60
OIR    2025250     91400   16.6300 -112.5100      19.7        37       140        60
OIR    2025250     91400   16.6300 -112.5200      19.8        37       141        60
OIR    2025250     91400   16.6300 -112.5300      20.0        37       141        60
OIR    2025250     91400   16.6300 -112.5400      20.2        37       140        60
OIR    2025250     91400   16.6300 -112.5500      20.3        38       139        60
OIR    2025250     91400   16.6300 -112.5600      20.4        38       137        60
OIR    2025250     91400   16.6300 -112.5700      20.6        38       136        60
OIR    2025250     91400   16.6300 -112.5800      20.9        38       136        60
OIR    2025250     91400   16.6300 -112.5900      21.1        38       136        60
OIR    2025250     91400   16.6300 -112.6000      21.2        39       136        60
OIR    2025250     91400   16.6300 -112.6100      21.3        39       135        60
OIR    2025250     91400   16.6300 -112.6200      21.4        39       134        60
OIR    2025250     91400   16.6300 -112.6300      21.5        40       134        60
OIR    2025250     91400   16.6300 -112.6400      21.6        41       135        60
OIR    2025250     91400   16.6300 -112.6500      22.0        42       139        60
OIR    2025250     91400   16.6300 -112.6600      22.0        42       142        60
OIR    2025250     91400   16.6200 -112.4900      19.5        36       144        60
OIR    2025250     91400   16.6200 -112.5000      19.5        36       139        60
OIR    2025250     91400   16.6200 -112.5100      19.6        37       139        60
OIR    2025250     91400   16.6200 -112.5200      19.7        37       141        60
OIR    2025250     91400   16.6200 -112.5300      19.8        37       141        60
OIR    2025250     91400   16.6200 -112.5400      20.0        37       139        60
OIR    2025250     91400   16.6200 -112.5500      20.1        37       137        60
OIR    2025250     91400   16.6200 -112.5600      20.2        38       137        60
OIR    2025250     91400   16.6200 -112.5700      20.4        38       137        60
OIR    2025250     91400   16.6200 -112.5800      20.5        38       137        60
OIR    2025250     91400   16.6200 -112.5900      20.7        38       139        60
OIR    2025250     91400   16.6200 -112.6000      20.8        39       138        60
OIR    2025250     91400   16.6200 -112.6100      21.0        39       136        60
OIR    2025250     91400   16.6200 -112.6200      21.2        40       134        60
OIR    2025250     91400   16.6200 -112.6300      21.4        40       134        60
OIR    2025250     91400   16.6200 -112.6400      21.5        41       135        60
OIR    2025250     91400   16.6200 -112.6500      21.8        42       139        60
OIR    2025250     91400   16.6200 -112.6600      21.9        43       144        60
OIR    2025250     91400   16.6100 -112.5000      19.5        37       143        60
OIR    2025250     91400   16.6100 -112.5100      19.5        37       142        60
OIR    2025250     91400   16.6100 -112.5200      19.6        37       143        60
OIR    2025250     91400   16.6100 -112.5300      19.7        37       143        60
OIR    2025250     91400   16.6100 -112.5400      19.8        37       142        60
OIR    2025250     91400   16.6100 -112.5500      19.9        37       140        60
OIR    2025250     91400   16.6100 -112.5600      20.1        38       139        60
OIR    2025250     91400   16.6100 -112.5700      20.2        38       138        60
OIR    2025250     91400   16.6100 -112.5800      20.3        38       137        60
OIR    2025250     91400   16.6100 -112.5900      20.4        38       138        60
OIR    2025250     91400   16.6100 -112.6000      20.6        39       138        60
OIR    2025250     91400   16.6100 -112.6100      20.8        39       136        60
OIR    2025250     91400   16.6100 -112.6200      20.9        40       133        60
OIR    2025250     91400   16.6100 -112.6300      21.2        41       135        60
OIR    2025250     91400   16.6100 -112.6400      21.3        41       136        60
OIR    2025250     91400   16.6100 -112.6500      21.6        42       141        60
OIR    2025250     91400   16.6000 -112.5400      19.7        37       145        60
OIR    2025250     91400   16.6000 -112.5500      19.8        37       144        60
OIR    2025250     91400   16.6000 -112.5600      20.0        38       142        60
OIR    2025250     91400   16.6000 -112.5700      20.1        38       139        60
OIR    2025250     91400   16.6000 -112.5800      20.2        38       137        60
OIR    2025250     91400   16.6000 -112.5900      20.3        38       137        60
OIR    2025250     91400   16.6000 -112.6000      20.4        39       136        60
OIR    2025250     91400   16.6000 -112.6100      20.5        39       135        60
OIR    2025250     91400   16.6000 -112.6200      20.6        39       133        60
OIR    2025250     91400   16.6000 -112.6300      20.8        40       135        60
OIR    2025250     91400   16.6000 -112.6400      21.0        41       137        60
OIR    2025250     91400   16.6000 -112.6500      21.3        42       142        60
OIR    2025250     91400   16.5900 -112.5400      19.6        37       144        60
OIR    2025250     91400   16.5900 -112.5500      19.7        37       143        60
OIR    2025250     91400   16.5900 -112.5600      19.8        37       142        60
OIR    2025250     91400   16.5900 -112.5700      20.0        38       141        60
OIR    2025250     91400   16.5900 -112.5800      20.0        38       140        60
OIR    2025250     91400   16.5900 -112.5900      20.1        38       139        60
OIR    2025250     91400   16.5900 -112.6000      20.2        38       138        60
OIR    2025250     91400   16.5900 -112.6100      20.4        39       137        60
OIR    2025250     91400   16.5900 -112.6200      20.4        40       136        60
OIR    2025250     91400   16.5900 -112.6300      20.4        40       137        60
OIR    2025250     91400   16.5900 -112.6400      20.4        41       138        60
OIR    2025250     91400   16.5900 -112.6500      20.7        41       141        60
OIR    2025250     91400   16.5800 -112.5400      19.6        37       144        60
OIR    2025250     91400   16.5800 -112.5500      19.6        37       142        60
OIR    2025250     91400   16.5800 -112.5600      19.7        37       141        60
OIR    2025250     91400   16.5800 -112.5700      19.8        38       143        60
OIR    2025250     91400   16.5800 -112.5800      19.9        38       144        60
OIR    2025250     91400   16.5800 -112.5900      20.0        38       143        60
OIR    2025250     91400   16.5800 -112.6000      20.1        38       141        60
OIR    2025250     91400   16.5800 -112.6100      20.2        39       140        60
OIR    2025250     91400   16.5800 -112.6200      20.2        40       140        60
OIR    2025250     91400   16.5800 -112.6300      20.2        40       140        60
OIR    2025250     91400   16.5800 -112.6400      20.2        41       140        60
OIR    2025250     91400   16.5800 -112.6500      20.3        41       141        60
OIR    2025250     91400   16.5700 -112.5800      19.8        38       144        60
OIR    2025250     91400   16.5700 -112.5900      19.9        38       144        60
OIR    2025250     91400   16.5700 -112.6000      20.0        39       143        60
OIR    2025250     91400   16.5700 -112.6100      20.1        40       143        60
OIR    2025250     91400   16.5700 -112.6200      20.2        40       143        60
OIR    2025250     91400   16.5700 -112.6300      20.1        41       144        60
OIR    2025250     91400   16.5700 -112.6400      20.1        41       145        60
OIR    2025250     91400   16.5600 -112.5900      19.8        38       144        60
OIR    2025250     91400   16.5600 -112.6000      19.9        39       144        60
OIR    2025250     91400   16.5600 -112.6100      20.0        40       144        60
OIR    2025250     91400   15.3300 -117.4900      38.2        39       146        60
OIR    2025250     91400   15.3200 -117.3600      37.3        41       145        60
OIR    2025250     91400   15.3200 -117.3700      38.8        40       143        60
OIR    2025250     91400   15.3200 -117.3800      39.6        39       143        60
OIR    2025250     91400   15.3200 -117.3900      39.9        39       144        60
OIR    2025250     91400   15.3200 -117.4700      38.0        39       146        60
OIR    2025250     91400   15.3200 -117.4800      37.9        40       146        60
OIR    2025250     91400   15.3200 -117.4900      37.9        40       145        60
OIR    2025250     91400   15.3100 -117.3600      36.9        42       143        60
OIR    2025250     91400   15.3100 -117.3700      38.8        40       140        60
OIR    2025250     91400   15.3100 -117.3800      39.6        39       139        60
OIR    2025250     91400   15.3100 -117.3900      39.9        39       139        60
OIR    2025250     91400   15.3100 -117.4000      39.9        39       141        60
OIR    2025250     91400   15.3100 -117.4100      39.9        39       144        60
OIR    2025250     91400   15.3100 -117.4200      39.8        39       144        60
OIR    2025250     91400   15.3100 -117.4300      39.4        39       145        60
OIR    2025250     91400   15.3100 -117.4400      38.6        39       145        60
OIR    2025250     91400   15.3100 -117.4500      38.2        39       145        60
OIR    2025250     91400   15.3100 -117.4600      37.9        39       146        60
OIR    2025250     91400   15.3100 -117.4700      37.8        40       147        60
OIR    2025250     91400   15.3000 -117.3700      38.3        40       143        60
OIR    2025250     91400   15.3000 -117.3800      39.4        39       142        60
OIR    2025250     91400   15.3000 -117.3900      39.8        39       142        60
OIR    2025250     91400   15.3000 -117.4000      39.9        39       143        60
OIR    2025250     91400   15.3000 -117.4100      39.9        39       144        60
OIR    2025250     91400   15.3000 -117.4200      39.7        39       144        60
OIR    2025250     91400   15.3000 -117.4300      39.3        39       144        60
OIR    2025250     91400   15.3000 -117.4400      38.6        39       145        60
OIR    2025250     91400   15.3000 -117.4500      37.9        39       146        60
OIR    2025250     91400   15.3000 -117.4600      37.6        40       146        60
OIR    2025250     91400   15.2900 -117.3700      35.6        42       146        60
OIR    2025250     91400   15.2900 -117.3800      37.3        41       145        60
OIR    2025250     91400   15.2900 -117.3900      38.6        40       146        60
OIR    2025250     91400   15.2900 -117.4000      39.4        39       146        60
OIR    2025250     91400   15.2900 -117.4200      39.5        39       147        60
OIR    2025250     91400   15.2900 -117.4300      38.8        39       146        60
OIR    2025250     91400   15.2900 -117.4400      37.8        39       146        60
OIR    2025250     91400   15.1200 -116.4000      19.2        47       155        60
OIR    2025250     91400   15.1100 -116.3200      22.6        51       144        60
OIR    2025250     91400   15.1000 -116.3200      22.6        50       139        60
OIR    2025250     91400   15.1000 -116.3900      19.3        44       145        60
OIR    2025250     91400   15.0800 -116.2800      23.3        52       141        60
OIR    2025250     91400   15.0800 -116.2900      23.4        51       133        60
OIR    2025250     91400   15.0800 -116.3000      23.3        49       142        60
OIR    2025250     91400   14.8600 -113.4700       9.7        19       148        60
OIR    2025250     91400   14.7500 -113.5800       9.4        15       147        60
OIR    2025250     91400   14.6800 -113.4100       8.3        15       149        60
OIR    2025250     91400   14.6400 -113.3700       7.0        15       148        60
OIR    2025250     91400   14.6000 -113.5100       6.0        10       147        60
OIR    2025250     91400   14.6000 -113.5200       5.7        10       147        60
